Towns / Simsbury / Conservation Commission/Inland Wetlands and Watercourses Agency / Oct 20, 2026
Conservation Commission/Inland Wetlands and Watercourses Agency, Oct 20, 2026
Simsbury Conservation Commission/Inland Wetlands and Watercourses Agency Hide agendas that already have minutesDocuments
| Type | Document | Pages | Open |
|---|---|---|---|
| minutesminutes | Conservation Commission/Inland Wetlands and Watercourses Agency Meeting Minutes | 4 | PDF download · town site |
| agenda | Conservation Commission/Inland Wetlands and Watercourses Agency Meeting | 1 | PDF download · town site |
| packetpacket | Conservation Commission/Inland Wetlands and Watercourses Agency Meeting (packet) | 39 | PDF download · town site |
Summary of the minutes
AI-generated summary. Each line links to the PDF page it came from; check it before relying on it.
Read the official minutes (PDF, 4 pages) The PDF is the record; this summary is a guide to it.
The Commission approved the October 6, 2026 minutes as amended, and approved wetland permits for a shed at 294 Bushy Hill Rd. (aka 298) and an accessory structure with filling and grading at 20 Neal Drive. Both permit approvals carried with conditions, and the meeting adjourned at 7:24 P.M.
Decisions (3) · all reported votes
- Approval of Minutes of October 6, 2026
Motion by Commissioner Haldeman, seconded by Commissioner Luzietti, to approve the Minutes of October 6, 2026, as amended (error corrected: 'Chair Winters' replaced with 'Vice Chair Levy'). Motion carried unanimously.
Vote: carried unanimously (6-0-0) · p. 4 - Application CC #26-21, Michael Nascimento, wetland permit for 16' x 20' accessory structure and filling/grading in regulated area at 20 Neal Drive, zone R-40 OS
Motion by Commissioner Kelsey, seconded by Commissioner Luzietti, to APPROVE Application CC #26-21 based on findings of no significant impact on wetland soils and use of soil and erosion control measures, with five conditions (conformance with application dated 09-29-2026, revised 10-19-2026; erosion and sediment controls; Bulletin 34 guidelines; removal of controls upon direction of agent; Inland Wetlands Agent notified 48 hours before activities). Motion carried unanimously.
Vote: carried unanimously (6-0-0) · p. 3 - Adjournment
Motion by Commissioner Haldeman, seconded by Commissioner Luzietti, to adjourn the meeting; adjourned at 7:24 P.M.
Vote: carried unanimously (6-0-0) · p. 4
Also discussed (1)
- Application CC 26-20, Mary Christine Wall, wetland permit for 16' x 10' shed in regulated area at 294 Bushy Hill (aka 298), zone R-40 OS: Motion by Commissioner Brittell, seconded by Commissioner Luzietti, to APPROVE Application CC #26-20 based on finding that the project will not adversely impact wetland soils or watercourse, with four conditions (conformance with application dated 9-29-2026 and 10-7-2026; erosion control per 2002 CT Guidelines/CTDEP Bulletin 34; removal of erosion controls upon direction of agent; Inland Wetlands Agent notified 48 hours before activities). Vote not recorded in the minutes for this motion. · p. 2
Summary of the agenda: Conservation Commission/Inland Wetlands and Watercourses Agency Meeting
AI-generated summary.
This is an agenda for the October 20, 2026 meeting listing two applications, CC 26-20 for 294 (aka 298) Bushy Hill Rd and CC 26-21 for 20 Neal Dr. The agenda lists supporting documents for each item, but no decisions or votes have been recorded yet.
On the agenda (2)
Full text of the documents
View the minutes PDF on this page (Conservation Commission/Inland Wetlands and Watercourses Agency Meeting Minutes)
Text of the minutes (Conservation Commission/Inland Wetlands and Watercourses Agency Meeting Minutes, 4 pages)
Page 1 · open in PDF
Page 1 of 4 Conservation Commission / Inland Wetlands and Watercourses Agency 1 Regular Meeting 2 October 20, 2026 – 7:00 P.M. 3 Simsbury Town Hall 4 933 Hopmeadow St, Simsbury, CT 06070 5 6 MINUTES 7 8 I. CALL TO ORDER – Vice Chair Jason Levy called the meeting 7:00 P.M. 9 10 Present: Vice Chair Jason Levy; Commission Members: Charles 11 Haldeman, Don Eaton, Matthew Kelsey, and Michael Luzietti; Alternate 12 Commission Member: Sue Brittell; and Planning Director, George K. 13 McGregor.14 15 Absent: Chair Margery Winters; Secretary Joe Campolieta; Alternate 16 Member Allison Wilcox17 18 Seating of Alternate: Commissioner Britell was seated as a regular 19 member for tonight’s meeting.20 21 II. APPROVAL OF MINUTES 22 23 October 6, 2026 24 25 Commissioner Haldeman identified an error 96, delete “Chair Winters” 26 and replace with “Vice Chair Levy.” 27 28 MOTION: Commissioner Haldeman made a motion, seconded by 29 Commissioner Luzietti, to approve the Minutes of October 6, 2026, as 30 amended. 31 32 The motion carried unanimously (6-0-0). 33 34 35 36
Page 2 · open in PDF
Page 2 of 4 III. IWWA APPLICATION(S) FOR PUBLIC HEARING OR ACTION 37 38 Application CC 26-20 of Mary Christine Wall, applicant and owner, for a 39 wetland permit to install a 16’ x 10’ shed in a regulated area at 294 Bushy 40 Hill (aka 298) (Assessor’s Map D15, Block 420, Lot 040) Simsbury, CT 41 06070, zone R-40 OS. 42 43 Mr. McGregor introduced the application; The Applicant, Ms. Wall 44 described the proposal. 45 46 MOTION: Commissioner Brittell made a motion, seconded by 47 Commissioner Luzietti, to APPROVE Application CC #26-20 of Mary 48 Christine Wall, applicant and owner, for a wetland permit to install a 16’ x 10’ 49 shed in a regulated area at 294 Bushy Hill Rd. (aka 298) based upon the following 50 findings: 51 52 a. The project will not adversely impact the wetland soils or watercourse as 53 the soils have been previously disturbed over the years and the project will 54 not amount to additional disturbance. 55 56 And subject to the following conditions: 57 58 1. The project shall be developed in substantial conformance with the 59 application information for 294 Bushy Hill Rd. (aka 298) dated 9-29-2026 60 and 10-7-2026. 61 2. All erosion control and soil stabilization measures (if necessary) shall 62 comply with the approved plans and the guidelines as established in the 63 Connecticut Guidelines for Soil Erosion and Sediment Control, 2002, 64 CTDEP Bulletin 34. 65 3. Upon direction of the Commission’s agent, erosion and sediment control 66 measures shall be removed by the applicant following stabilization of the 67 site. 68 4. The Inland Wetlands Agent shall be notified at least 48 hours prior to 69 commencement of activities. 70 71 Application CC #26-21 of Michael Nascimento, applicant and owner, for 72 a wetland permit to construct a 16 x 22’ outbuilding and filling/grading in 73 a regulated area in order to improve backyard conditions at 20 Neal Drive 74 (Assessor’s Map B18, Block 501, Lot 009) Simsbury, CT 06070, zone R-40 75 OS. 76
Page 3 · open in PDF
Page 3 of 4 77 Mr. and Mrs. Nascimento, joined by their engineer, James Dempsey, 78 presented their request for a new wetlands permit at 20 Neal Dr. 79 80 MOTION: Commissioner Kelsey made a motion, seconded by 81 Commissioner Luzietti, to APPROVE Application CC #26-21 of Michael 82 Nascimento, applicant and owner, for a wetlands permit to install a 16’x20’ 83 accessory structure and to allow filling/grading and other improvements in a 84 regulated area in order to improve backyard conditions at 20 Neal Drive 85 (Assessor’s Map B18, Block 501, Lot 009) Simsbury, CT 06070, zone R-40 OS. 86 based upon the following findings: 87 88 a. The project will not have a significant impact on the wetland soils. 89 b. Soil and erosion control measures will be utilized so as to not further 90 negatively impact the wetlands. 91 And subject to the following conditions: 92 93 1. The project shall be developed in substantial conformance with the 94 application information for 20 Neal Drive, dated 09-29-2026, revised 10-19-95 026. 96 2. At all times during site work and until soil areas are stabilized, the 97 applicant shall install and maintain erosion and sediment control measures 98 depicted in the application or other measures deemed necessary by the 99 Commission’s agent to prevent erosion and sedimentation impacts to the 100 watercourse. 101 3. All erosion control and soil stabilization measures shall comply with the 102 approved plans and the guidelines as established in the Connecticut 103 Guidelines for Soil Erosion and Sediment Control, 2002, CTDEP Bulletin 104 34. 105 4. Upon direction of the Commission’s agent, erosion and sediment control 106 measures shall be removed by the applicant following stabilization of the 107 site. 108 109 5. The Inland Wetlands Agent shall be notified at least 48 hours prior to 110 commencement of activities. 111 112 113 The motion carried unanimously (6-0-0). 114 115
Page 4 · open in PDF
Page 4 of 4 116 117 IV. ADJOURNMENT 118 119 MOTION: Commissioner Haldeman made a motion, seconded by 120 Commissioner Luzietti, to adjourn the meeting. 121 122 The motion carried unanimously (6-0-0).123 124 Vice Chair Levy adjourned the meeting at 7:24 P.M. 125 126 Respectfully submitted, 127 128 George K. McGregor 129 Planning and Community Development Director 130
View the agenda PDF on this page (Conservation Commission/Inland Wetlands and Watercourses Agency Meeting)
Text of the agenda (Conservation Commission/Inland Wetlands and Watercourses Agency Meeting, 1 page)
Page 1 · open in PDF
Conservation Commission/Inland Wetlands And Watercourses Agency Agenda 10-20-26 AGENDA.PDF CC 26-20 294 (Aka 298) Bushy Hill Rd CC 26-20 298 BUSHY HILL RD STAFF REPORT.PDF CC 26-20 298 BUSHY HILL RD APPLICATION AND PLOT PLAN - REDACTED.PDF CC 26-20 298 BUSHY HILL COMBINED PHOTOS FROM 10-13-26.PDF CC 26-20 298 BUSHY HILL RD ADDITIONAL PLANS AND SHED INFORMATION.PDF CC 26-21 20 Neal Dr CC 26-21 20 NEAL DRIVE STAFF REPORT.PDF CC 26-21 20 NEAL DRIVE APPLICATION, NARRATIVE, AND SITE PLAN - REDACTED.PDF 1. Documents: 2. Documents: 3. Documents:
View the packet PDF on this page (Conservation Commission/Inland Wetlands and Watercourses Agency Meeting (packet))
Text of the packet (Conservation Commission/Inland Wetlands and Watercourses Agency Meeting (packet), 39 pages)
Page 1 · open in PDF
Conservation Commission/Inland Wetlands And Watercourses Agency Agenda 10-20-26 AGENDA.PDF CC 26-20 294 (Aka 298) Bushy Hill Rd CC 26-20 298 BUSHY HILL RD STAFF REPORT.PDF CC 26-20 298 BUSHY HILL RD APPLICATION AND PLOT PLAN - REDACTED.PDF CC 26-20 298 BUSHY HILL COMBINED PHOTOS FROM 10-13-26.PDF CC 26-20 298 BUSHY HILL RD ADDITIONAL PLANS AND SHED INFORMATION.PDF CC 26-21 20 Neal Dr CC 26-21 20 NEAL DRIVE STAFF REPORT.PDF CC 26-21 20 NEAL DRIVE APPLICATION, NARRATIVE, AND SITE PLAN - REDACTED.PDF 1. Documents: 2. Documents: 3. Documents:
Page 2 · open in PDF
Page 1 of 1 Conservation Commission/Inland Wetlands and Watercourses Agency Regular Meeting October 20, 2026, at 7:00 PM Town Hall-BOE Conference Room 933 Hopmeadow Street, Simsbury, CT, 06070 AGENDA I. CALL TO ORDER & SEATING OF ALTERNATES II. APPROVAL OF MINUTES October 6, 2026 III. IWWA APPLICATION(S) FOR RECEIPT AND DETERMINATION OF SIGNIFICANCE IV. IWWA APPLICATION(S) FOR PUBLIC HEARING OR ACTION Application CC #26-20 of Mary Christine Wall, applicant and owner, for a wetland permit to install a 16’ x 10’ shed in wetland soils/regulated area at 294 Bushy Hill (Assessor’s Map D15, Block 420, Lot 040) Simsbury, CT 06070, zone R-40 OS. Application CC #26-21 of Michael Nascimento, applicant and owner, for a wetland permit to construct a 16 x 22’ outbuilding and filling/grading in a regulated area in order to improve backyard conditions at 20 Neal Drive (Assessor’s Map B18, Block 501, Lot 009) Simsbury, CT 06070, zone R-40 OS. V. CONSERVATION COMMISSION AND OTHER IWWA BUSINESS Election of Officers VI. DESIGNATED AGENT ACTIONS AND OTHER REPORTS Application CC #26-22 of Brian and Michelle Rotondo, applicant and owner, for a wetland permit to construct a +-738 sq.ft. (12 x 24’ garage and 15 x 30’ workshop) addition in the upland review area at 4 Adams Road (Assessor’s Map D19, Block 601, Lot 030) Weatogue, CT 06089, zone R-40. VII. ADJOURNMENT
Page 3 · open in PDF
Marc S. Nelson, MPA George K. McGregor, AICP Town Manager Director PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT Telephone (860) 658-3245 Facsimile (860) 658-3206 An Equal Opportunity Employer www.simsbury-ct.gov 8:30 – 7:00 Monday 8:30 – 4:30 Tuesday through Thursday 8:30 – 1:00 Friday TO: Simsbury Conservation Commission/Inland Wetlands Agency FROM: George K. McGregor, AICP DATE: October 20, 2026 RE: Application CC #26-20 of Mary Christine Wall, applicant and owner, for a wetland permit to install a 16’ x 10’ shed in a regulated area at 294 (aka) 298 Bushy Hill Rd. (Assessor’s Map D15, Block 420, Lot 040) Simsbury, CT 06070, zone R-40 OS. Summary of Request Mary Christine Wall, owner and applicant, has submitted an Inland Wetlands application for a wetlands permit to install a 16’x10’ utility shed in the wetlands soils. The Applicant plans to install a small “mini-barn style storage building” at 294 Bushy Hill. Shown as two parcels in the GIS data-base, the Applicant is the owner of what was previously 294 and 298 Bushy Hill. These parcels have now been combined, but not reflected as of yet in the GIS, (June 2026) forming one 1.32 acre parcel. The former 294 address is almost entirely in wetlands soils (see above). The Applicant proposes to place the shed (estimated in yellow) on an existing gravel base on grade. No additional stone or disturbance is planned. The gravel location is shown below (with SUV), just off the main driveway:
Page 4 · open in PDF
2 The Applicant has provided cross sectional details of the proposed 16’x10” shed:
Page 5 · open in PDF
3 At the October 6, 2026, meeting, the IWWA found the application non-significant. Draft Motion Moved, the Inland Wetlands & Watercourses Commission APPROVES Application CC #26-20 of Mary Christine Wall, applicant and owner, for a wetland permit to install a 16’ x 10’ shed in a regulated area at 298 Bushy Hill Rd. based upon the following findings: a.The project will not adversely impact the wetland soils or watercourse as the soils have been previously disturbed over the years and the project will not amount to additional disturbance. And subject to the following conditions: 1.The project shall be developed in substantial conformance with the application information for 294 Bushy Hill Rd. dated 9-29-2026 and 10-7-2026. 2. All erosion control and soil stabilization measures (if necessary) shall comply with the approved plans and the guidelines as established in the Connecticut Guidelines for Soil Erosion and Sediment Control, 2002, CTDEP Bulletin 34. 3. Upon direction of the Commission’s agent, erosion and sediment control measures shall be removed by the applicant following stabilization of the site. 4.The Inland Wetlands Agent shall be notified at least 48 hours prior to commencement of activities. Or Moved, (An alternative Motion)
Page 6 · open in PDF
Page 7 · open in PDF
Page 8 · open in PDF
Page 9 · open in PDF
Page 10 · open in PDF
Page 11 · open in PDF
Page 12 · open in PDF
Page 13 · open in PDF
Page 14 · open in PDF
Page 15 · open in PDF
Page 16 · open in PDF
Page 17 · open in PDF
Page 18 · open in PDF
Page 19 · open in PDF
Page 20 · open in PDF
Town of Simsbury
933 HOPMEADOW STREET SIMSBURY, CONNECTICUT 06070
Office of Planning and Community Development
Telephone (860) 658-3245
Facsimile (860) 658-3206
An Equal Opportunity Employer
www.simsbury-ct.gov
8:30 – 7:00 Monday
8:30 – 4:30 Tuesday through Thursday
8:30 – 1:00 Friday
To: Simsbury Conservation Commission/Inland Wetlands Agency
From: George K. McGregor, AICP
Date: October 20, 2026
RE: CC 26-21, 20 Neal Drive
Summary of Request
Michael Nascimento, applicant and owner, has applied for a wetlands permit to
install a 16’x20’ accessory structure; to allow filling/grading; and to permit other
improvements in a regulated area in order to improve backyard conditions at 20
Neal Drive (Assessor’s Map B18, Block 501, Lot 009) Simsbury, CT 06070, zone R-
40 OS.
According to the Town of Simsbury
wetlands and watercourses map,
there are wetland soils that are
located adjacent to the rear
property line, please see the map
to the right.
Per Section 6 – Regulated
Activities to be Licensed, the
depositing or removing of material
and grading within wetlands soils
or a watercourse and upland
review areas is a regulated
activity.
The Inland Wetlands Agency
found this activity to be non-
significant at the October 6, 2026, regularly scheduled meeting. The Applicant
states that the project will improve drainage conditions in the rear yard while also
providing a more usable and accessible space on the property.
This is the second wetlands permit application for this property. Application 26-21
requests additional activity beyond what was approved by the Commission in
Page 21 · open in PDF
2 Application 25-13, approved in May 2025. After a complaint was received by the Planning Department in September 2026 that there was activity on site beyond the original approval, Town Staff investigated, performed a site visit, and determined that unpermitted work, in fact, took place. All work was halted. The Applicant responded quickly, submitting a new wetlands permit application and new site plan for the additional work. The Applicant explains that the project has evolved in order to address serious slope issues on site and in such proximity to the house. Staff Analysis The property is a 0.51-acre parcel. The wetland located adjacent to the rear property line is a reed marsh along the “toe” of a slope with transitional shrubs along the edge (the Applicant has submitted a narrative which includes several photos). The project is intended to improve accessibility and usability of the rear yard and improve drainage conditions. The original project, according the the Applicant’s narrative, included the installation of “riprap sloped revetment underlain by geotextile fabric, installation of approximately 300 cubic yards of fill, installation of hardscape surface in rear of the building, regrading to ease the property slopes, installation and redirection of roof drains into infiltration units contained in the fill below the hardscape, and installation of access paths and/or ramp for ADA access to the back of the house.” The new application includes the following: A retaining wall with steps to traverse between two filled areas creating an upper and lower lawn area. The paved patio was relocated to the north and placed at a higher elevation. The original area for the patio will now be predominately lawn A new double-retaining wall on the north side has been added. The fill and revetment rip rap area has been expanded and extended. A new retaining wall has been added mid-slope at the southern end of the house to reduce run-off. A new infiltration trench has been added. A new chicken coop accessory structure is included. Installation of 700 cubic yards of fill. Extensive silt fencing will be used during the project in order to protect the wetlands on the property. The Applicant’s engineer James K. Demsey, PE, has submitted a revised narrative explanation for all of the additional items requestd in this application. New photos and simulations have been added to the submission. A revised site plan detailing the changes has also been provided:
Page 22 · open in PDF
3 Draft Motions Moved, the Inland Wetlands and Watercourses Commission Application CC #26-21 of Michael Nascimento, applicant and owner, for a wetlands permit to install a 16’x20’ accessory structure and to allow filling/grading and other improvements in a regulated area in order to improve backyard conditions at 20 Neal Drive (Assessor’s Map B18, Block 501, Lot 009) Simsbury, CT 06070, zone R-40 OS. based upon the following findings: a.The project will not have a significant impact on the wetland soils. b.Soil and erosion control measures will be utilized so as to not further negatively impact the wetlands.
Page 23 · open in PDF
4 And subject to the following conditions: 1.The project shall be developed in substantial conformance with the application information for 20 Neal Drive, dated 09-29-2026. 2.At all times during site work and until soil areas are stabilized, the applicant shall install and maintain erosion and sediment control measures depicted in the application or other measures deemed necessary by the Commission’s agent to prevent erosion and sedimentation impacts to the watercourse. 3. All erosion control and soil stabilization measures shall comply with the approved plans and the guidelines as established in the Connecticut Guidelines for Soil Erosion and Sediment Control, 2002, CTDEP Bulletin 34. 4. Upon direction of the Commission’s agent, erosion and sediment control measures shall be removed by the applicant following stabilization of the site. 5.The Inland Wetlands Agent shall be notified at least 48 hours prior to commencement of activities. Or Moved, (An alternative motion)
Page 24 · open in PDF
Page 25 · open in PDF
2 of 4 INSTRUCTIONS FOR APPLICANT Any person seeking a permit to carry out a regulated activity on property which has been designated an inland wetland or watercourse by the Conservation Commission or within the 100- foot regulated buffer area of a designated inland wetland or watercourse must complete and submit the Inland Wetlands Permit Application to the Planning Department. Submission shall occur by the day before a regular meeting of the Conservation Commission. (See Section 5 of the Inland Wetlands and Watercourses Regulations of the Town of Simsbury.) Application will be heard at the following meeting, after petition period. The original application shall be submitted with five (5) copies. Maps on sheets larger than 11”x14” shall be submitted in at least three (3) copies. Additional copies of site plans may be required. PDFs of the maps, if available, should be submitted, as well. PDFs can be emailed to jhollis@simsbury-ct.gov. A filin g fee shall accompany the application , as required b y the Land Use Application Fees schedule. Please consult with the Planning Office for specific fee determination. The following information shall be provided on white paper (8 ½”x11”) and typewritten. Reproduce the following questions along with the answer and attach to the application. 1. In the case of a public hearing or map amendment, list on a separate sheet of paper the names and addresses of all abutting property owners and property owners within 100 feet of all property lines. Identify on one of the attached maps. 2. Describe the site and the regulated area or wetlands/watercourses involved: a. General site conditions, including vegetation and general soil conditions. b. Size of wetland within site or distance of the activity from the wetland. c. Size of total contiguous wetland. d. Position relative to other wetlands on site. e. Type of wetland characterized by vegetative and soil type and/or watercourse, such as: 1) open/deep fresh water pond or lake; 2) shallow marsh; 3) seasonally flooded basins and flats; 4) meadow; 5) shrub swamp; 6) wooded swamp; 7) bog; 8) kettle; 9) stream type; 10) other.
Page 26 · open in PDF
3 of 4 3. Depth to water table, depth to mottled soil, and seasonal variation of water table. 4. Describe the immediate impact on the wetlands and watercourses, including, but not limited to: a. Quantities, by volume and area disturbed, of materials to be removed, deposited, or altered. b. Kinds of materials by soil types and vegetative classifications, and materials classification to be removed, deposited, or altered. c. Percent of wetlands/watercourses disturbed or altered to total area of wetlands/watercourses on the parcel. 5. Describe the related construction activities and their impact on: a. Area and location of wetlands and watercourses. b. Types and amounts of vegetation. c. Surface and groundwater. d. Visual impacts. e. Wildlife habitats. 6. Describe the long term or permanent impact of the activity(ies) on environmental aspects, such as the surface and groundwater quality, storm water runoff, visual impact(s), or wildlife habitats on: a. Wetlands and/or watercourses. b. Abutting riparian properties and/or wetlands and/or watercourses. 7. Identify sedimentation and erosion control measures to be used. 8. Identify alternatives to the proposed activity that were considered, including alternative sites and why this one was chosen. 9. Estimate cost of work and time for completion. 10. Attach drainage calculations and other reports as indicated to substantiate the statements made above. 11. REQUIRED MAPS a. Attach a vicinity map on an 8 ½”x11” sheet at scale 1”=200’ or 1’=800’ (depending upon the size of the parcel) showing the general location of the area in which the regulated activity is proposed. The map should be in sufficient detail to allow the identification of the property on the official Inland Wetlands and Watercourses map. A guide to the kinds of information to be shown is available in the Planning Department at the Town Hall.
Page 27 · open in PDF
4 of 4 b. Site Plan(s) showing: i. The topography showing contours at intervals of not more than two (2) feet and a minimum of two (2) contour marks per ten (10) acres at a scale of 1”=100’ or 1”=40’ (whichever is more appropriate). ii. Location of existing watercourses and/or ponds. iii. Location of regulated activity. iv. Proposed grading and/or filling. v. Proposed drainage, site utilities, wells, etc. vi. Sedimentation and erosion control measures. 12. The Applicant shall certify whether: a. Any portion of the property on which the regulated activity is proposed is located within 500 feet of the boundary of an adjoining municipality. b. Traffic attributable to the completed project on the site will use streets within the adjoining municipality to enter or exit the site. c. Sewer or water drainage from the project site will flow through and affect the sewage or drainage system within the adjoining municipality or d. Water runoff from the improved site will affect streets or other municipal or private property within the adjoining municipality. e. Documentation that notice of the pending application was provided to the adjacent municipality (certified mail, return receipt requested) on the same day of filing an inland wetland permit application with the Town of Simsbury. f. The property is subject to a conservation restriction or preservation restriction, and, if so, what party or parties are holders thereof or intended to be benefitted thereby. ALL INFORMATION MUST BE COMPLETED TO THE EXTENT INDICATED BY THE COMMISSION BEFORE ANY ACTION IS TAKEN ON THE PERMIT APPLICATION. INCOMPLETE APPLICATIONS WILL BE DENIED. ADDITIONAL INFORMATION MAY BE REQUIRED BY THE COMMISSION. THE APPLICANT AND/OR AUTHORIZED AGENT SHOULD ATTEND THE CONSERVATION COMMISSION/INLAND WETLANDS & WATERCOURSES AGENCY MEETING IN ORDER FOR A DECISION TO BE RENDERED. IF APPLICANT OR AGENT DOES NOT ATTEND, AND QUESTIONS ARISE, DECISION ON APPLICATION MAY BE DEFERRED OR DENIED.
Page 28 · open in PDF
J K Dempsey Engineering PLLC 308 New London Turnpike Stonington, CT 06378 Michael Nascimento Residence 20 Neal Drive, Simsbury, CT Community Planning and Development Inland Wetlands Permit Application New Permit JKDE Project No.: 012325 Prepared by James K Dempsey, PE September 29, 2026
Page 29 · open in PDF
J K Dempsey Engineering, PLLC 20 Neal Drive, Simsbury, CT Inland Wetlands Permit R1 JKDE No.: 012325 Page 2 Description: On May 8, 2025 the owner of the property at 20 Neal Drive received a permit, CC#25-13, for regulated activities within the 100’ upland review area and minor activities within the wetland located at the rear of the property. The project included the regrading, installation of fill, removal of vegetation, installation of stone revetment, installation of paving stones, and the installation of ADA compliant paths for access to the constructed patio area at the rear of the house as depicted below. Regulated Activities: Regulated activities at the site will include: Installation of erosion and sediment controls The cutting of vegetation along the wetlands to allow the formation of the revetment toe Installation of riprap revetment, filter stone, and geotextile fabric Installation of drainage pipe, infiltration units, and infiltration trench Installation of approximately 700 cubic yards of clean, free draining fill Installation of hardscape patio surface level with the door entry at the rear of the house Installation of plantings and fence at the top of the revetment Installation of ADA surfaces to allow access from the front of the house to the rear Installation of retaining walls Installation of outbuilding – chicken coop Construction began in the fall of 2025 with the installation of sediment controls, removal of trees, removal of existing paving stones, removal of vegetation in the wetland disturbance area as depicted in the permit application, and rough grading. The project was forced to stop work because of the winter weather. In the spring, the contractor who began the construction did not return to continue the work and the owner was forced to hire another contractor to continue the project. The owner determined the project, as permitted, was not fulfilling his needs. Deviations from the permit were then undertaken to extend the fill areas to the north and south applying the same design concepts and creating areas of less slope that the owner can traverse in his wheel chair. A retaining wall was installed with steps to traverse between the two filled areas creating an upper and lower lawn area at the rear and south side of the house. The paved patio depicted in the original permit was moved to the north at a higher elevation which will provide easier access for the owner. The area of the original patio will now be lawn except for a small paver block entry patio to the lower sliding door. As construction continued, other improvements were made including the installation of a double retaining wall at the north side of the property required to retain soil previously retained by a dilapidated block wall and vegetation. The fill and revetment on the south side of the property extended to the property line and returned to create a level lawn on the south side of the house. A retaining wall was installed mid-slope at the south of the house adjacent to the existing
Page 30 · open in PDF
J K Dempsey Engineering, PLLC
20 Neal Drive, Simsbury, CT
Inland Wetlands Permit R1 JKDE No.: 012325
Page 3
retaining wall to terrace the land and reduce runoff. At the request of the south property owner,
an infiltration trench was installed at the south side of the property to collect runoff water before
it could enter the property to the south. A chicken coop structure is under construction on the
south side of the property.
Near the end of July, 2026, Brittany MacGilpin – Assistant Town Planner / Wetlands
Designated Agent, visited the property. The owner was informed that the construction appeared
to violate the current wetland permit application. The Town asked the owner to retain an
engineer to produce plans and documents that would depict the scope of the original permit and
the scope of the existing construction. Some construction continued until the end of August. A
Stop Work Order was issued by the Town on September 1, 2026.
In this new application the owner requests approval of the extended proposed
improvements within the wetlands upland review area. Since the last meeting, additional silt
fence has been installed at the top of the revetment slope to retain sediment from moving onto
the slope and into the wetland. Approvals for the proposed structures including the walls, patio,
and outbuilding have been obtained from the building department awaiting approval of those
improvements within the wetlands upland review area.
Section 1: Abutters
In the event of a public hearing or map amendment, the following is a list of abutting
property owners and property owners within 100 feet of the subject property’s lines.
Town of Simsbury Kimberly A Steele Leroy T. Lawson
Simsbury, CT 06070 22 Neal Drive 18 Neal Drive
Simsbury, CT 06070 Simsbury, CT 06070
Gregory Wooley & Eric L. & William Brian &
Kathryn Ritz Kristen Ferguson Pavla K. Fischer
17 Neal Drive 19 Neal Drive 28 Drumlin Road
Simsbury, CT 06070 Simsbury, CT 06070 West Simsbury, CT 06092
Robert N. & Francis Peter &
Lori F. Blomberg Margaret Sexton
21 Neal Drive 26 Drumlin Road
Simsbury, CT 06070 West Simsbury, CT 06092
Section 2: Regulated Area / Wetland or Watercourse
a. Reed marsh associated with the north tributary to Nod Brook. The site consists of
wetland soils and hosts facultative (FAC) and facultative wetland (FACW) species of
shrubs, plants, and trees along the edges with dense Phragmites making up the
majority of the vegetation in the marsh.
b. Approximately 0.15 acres of the site contains wetlands
c. The total size of the contiguous wetland is approximately 60 acres with approximately
200’ aligned with this project site.
d. The begins at the bottom of the slope in the rear of the house.
e. Wetland described as Shallow marsh Page 31 · open in PDF
J K Dempsey Engineering, PLLC 20 Neal Drive, Simsbury, CT Inland Wetlands Permit R1 JKDE No.: 012325 Page 4 Section 3: Water Table The water table is approximately 6” below the surface at the bottom of the slope where the revetment would be installed. The elevation is estimated to be 265.5’. The seasonal water table change is estimated to be 6”. Section 4: Impact to Wetlands a. Deposition of approximately 300 CY of fill over 1600 SF 837 CY over 3500 SF b. There will be no fill removed from the site. Fill quantities are as follows: i. Riprap 90 cy 135 ton ii. ¾” Stone 50cy 75 ton iii. Fill 697 cy 1046 ton iv. Geotextile Fabric 350 sy c. Approximately 250 sf or wetland will be permanently altered. The wetland area on the parcel is about 7,840 sf. The disturbance percentage altered permanently is 3.2%. Section 5: Construction Activities a. The construction activities for the revetment and majority of fill will take place immediately upland of the wetland border. The activity nearest the wetland will take place along a 200’ long area. b. 3-4 midsize bushes and six trees and several shrubs will be removed to install the revetment adjacent to the wetland. One larger tree, further from the wetland may need to be removed. Phragmites in the disturbed wetland area, 200 sf will need to be removed for silt fence installation. Several trees and shrubs will be removed from the north side yard. c. Surface and groundwater will be directed to the sides of the construction area while the construction activities are taking place. Groundwater is not expected to be an issue and there is no plans for dewatering or redirecting groundwater. At the request of the south neighbor, Kimberly Steele, an infiltration trench will be installed at the bottom of the slope of the south side yard to catch any runoff coming toward her property and infiltrate it into the soil. The trench is three feet wide by three feet deep by sixty feet long running east to west. d. Visual impacts have been minimal for the work in the review area however, the construction of the improvements on the upside of the house has had greater visual impact from the street. e. Wildlife habitat has been minimally impacted during construction. Section 6: Permanent Impact of Proposed Activities a. The permanent impact of the proposed activities will be minimal over the existing conditions. The project will reduce the grade of a large area of rear yard and side yards at the residence allowing for longer “time of concentrations” for the runoff. It will also reduce velocity of the runoff. It will address soil erosion issues caused by the steeper grade and sparce vegetation that had been taking place. The installation of the roof drain pipes and infiltrators will allow for infiltration and slower, more directed movements of the roof runoff. The addition of native plantings along the
Page 32 · open in PDF
J K Dempsey Engineering, PLLC 20 Neal Drive, Simsbury, CT Inland Wetlands Permit R1 JKDE No.: 012325 Page 5 top of the stone revetment will work to trap sediment that may be transported in rills toward the wetland. The project will improve the overall visual aspect of the property and allow the owner to enjoy his outdoor environment. The existing and proposed improvements are not expected to have al permanent impact on the wetlands once construction is completed and vegetation is established. b. The abutting riparian properties and/or wetlands and/or watercourse is expected to have a positive benefit from this project. The property currently has erosion issues with little or no retention of roof drain water. This project is expected to improve water quality in the marsh and book by reducing sediment from the property. It will also reduce velocities of runoff and allow longer times of concentration. Section 7: Sediment and Erosion Controls The contractor has been required to install a row of silt fence on the lower extents of the construction activity site and shall maintain the silt fence for the duration of the project. In addition, a row of silt fence has been installed at the top of the revetment slope and will remain during construction and until vegetation is established. The silt fence shall be inspected after each rain event and at least weekly. Section 8: Alternatives The alternative to the proposed activities considered for this project included a raised deck. This option is less attractive as it does not address the erosion issue taking place at the property. The drainage system could be installed but without changing the slope and installing less erodible surface treatments it will continue to degrade. The construction impact would be similar during construction of a raised deck as with the proposed construction. The proposed option is also thought to be less expensive to maintain. Section 9: Cost Estimation and Time to Construct The estimated cost of construction of this project is $120,000.00. The duration of the construction activities is expected to be twelve months. Section 10: Calculations and Reports No drainage calculations or other reports have been prepared at this time for this project. Section 11: Maps, Site Plan, Proposed and Existing Drawings, and Photos See attached. Section 12: Applicant Certifications a. Any portion of the property on which the regulated activity is proposed is located within 500 feet of the boundary of an adjoining municipality. It does not – N/A b. Traffic attributable to the completed project on the site will use streets within the adjoining municipality to enter or exit the site. Yes, for deliveries and mobilization / demobilization c. Sewer or water drainage from the project site will flow through and affect the sewage or drainage system within the adjoining municipality. No
Page 33 · open in PDF
J K Dempsey Engineering, PLLC
20 Neal Drive, Simsbury, CT
Inland Wetlands Permit R1 JKDE No.: 012325
Page 6
d. Water runoff from the improved site will affect streets or other municipal or private
property within the adjoining municipality.
No
e. Documentation that notice of the pending application was provided to adjacent
municipality (certified mail, return receipt requested) on the same day of filing an
inland wetland permit application with the Town of Simsbury.
N/A
f. The property is subject to a conservation restriction or preservation restriction, and, if
so, what party or parties are holders thereof or intended to be benefitted thereby.
N/A
Photos:
Pre-Construction Back Yard Pre-Construction Back Yard
Pre-Construction Backyard Pre-Construction Backyard
Page 34 · open in PDF
J K Dempsey Engineering, PLLC
20 Neal Drive, Simsbury, CT
Inland Wetlands Permit R1 JKDE No.: 012325
Page 7
Pre-Construction North Side Yard New Entry Patio Backyard
Side Yard Retaining Walls Back Yard – Upper Yard
Page 35 · open in PDF
J K Dempsey Engineering, PLLC
20 Neal Drive, Simsbury, CT
Inland Wetlands Permit R1 JKDE No.: 012325
Page 8
Backyard Paver Patio Area Backyard
South Side Yard Revetment Backyard Revetment
Page 36 · open in PDF
J K Dempsey Engineering, PLLC
20 Neal Drive, Simsbury, CT
Inland Wetlands Permit R1 JKDE No.: 012325
Page 9
Backyard Retaining Wall South Side Yard Retaining Wall
South Side Yard Infiltration Trench
Page 37 · open in PDF
J K Dempsey Engineering, PLLC
20 Neal Drive, Simsbury, CT
Inland Wetlands Permit R1 JKDE No.: 012325
Page 10
Walls at Front of House Walls at Front of House
Vision – Back Yard at Paver Patio Vision – Top of Revetment
Page 38 · open in PDF
J K Dempsey Engineering, PLLC
20 Neal Drive, Simsbury, CT
Inland Wetlands Permit R1 JKDE No.: 012325
Page 11
Vision – Driveway from Neal Drive Vision – Front from Neil Drive
Vision – From End of Neil Drive Vision – Upper Yard and Patio
Page 39 · open in PDF
PROPERTY OFSTEELE, KIMBERLY A.22 NEAL DRIVE PROPERTY OFLAWSON, LEROY T18 NEAL DRIVE 266.00 267.00 268.00 269.00 270.00 275.00 276.00 277.00 278.00 278.00 280.00 281.00 282.00 283.00 284.00 288.00 290.00 285.00 287.00 289.00 290.00 293.00 294.00 290.00 284.00 273.00 275.00 270.00 272.00 270.00 266.00 275.00 280.00 284.00 285.00 287.00 288.00 272.00 273.00 284.00284.00 -61.1% -68.8% -72.3% -82.0% -67.7% 96.2 Date NoRevision 308 New London Turnpike, Stonington, CT 06378 (860) 405-7020 Michael Nascimento Residence 20 Neal Drive Existing Conditions 08/01/26 & Proposed Improvements GP1 J.K. Dempsey Engineering PLLC Date:August 30, 20261"=10' Scale: Project #: JKDE #: 080126 parcel information location20 neil drive useresidential id30762000 map block lotB18 501 009 acres0.5100 zoningR40OS volume/page7 ZONE: R-40osrequired MINIMUM LOT AREA existing 30,000 SF MINIMUM LOT WIDTH150'150' 30555 SF MINIMUM FRONT YARD50' MINIMUM SIDE YARD MINIMUM REAR YARD 25' - MAXIMUM HEIGHT35'35' 52.6' 44.5' & 26' 8.2% 50'79' BUILDING COVERAGE MAXIMUM (IMPERVIOUS SURFACE) COVERAGE-13.8% proposed 150' 30555 SF 35' 52.6' 44.5 & 26' 9.1% 79' 24.8% Feet 01020 17.6 existing main house proposed paver entry 6' high retaining wall and steps stone revetment retaining walls alta block by nicolock 4' high max typical retaining walls alta block by nicolock 3'-6' high max grass typical existing retaining wall mailbox approximate property line approximate property line approximate property line grass typical NOTES 1.property survey taken from subdivision plan: "final subdivision plan rosewood estates property of a.a.sasportas builders, inc. bushy hill road, simsbury connecticut scale 1"=100' july 19, 1971 office of sanderson & washburn, simsbury connecticut r-40 open space zone" 2.existing topographic data taken from 2023 state lidar survey 3.new topographic data recorded by JKDE 8/1/26 4.all coordinates refer to connecticut state plane nad 83 us survey foot. all elevations refer to navd 88 in us survey foot. 5.wetland line taken from the town of simsbury, connecticut "town acad wetland map 2014" 6.existing fill is bare earth with no veggitation 7.original design revetment slope 1v:1.5h typical = 66.6% 8.revetment construction is earth separated with geotextile and stone cover - varies from original design wetlands typical wetland boundry town map wetland boundry town map road frontage line from subdivision drawing 4' high fence proposed typical 78.9 26.0 44.5 catch basin stone surface proposed to be asphalt existing asphalt surface existing subsurface septic system extent of disturbance from wetland permit extend of disturbance from wetland permit top of slope bottom of slope bottom of slope bottom of slope top of slope top of slope apparent fill area over property line lower lawn upper lawn paver area mid-wall upper wall driveway area cut-fill report locationarea (sf)cut (cy)fill (cy)net (cy) lower lawn615059326267 fill upper lawn30870646646 fill paver area21794414197 fill upper wall500055 fill lower wall47225223 cut drive area42831563153 cut total166712841123839 fill the original wetlands permit was based on the following fill schedule. riprap45cy 3 4" stone25cy fill230cy total300cy over 1600 sf nds infiltration unit outlet to revetment nds infiltration unit overflow to revetment 100' wetlands review line 100' wetlands review line 3" asphalt curb existing well infiltration trench added since site vist approximate location retaining wall added since site visit approximate location 4'-5' height extent of disturbance from wetland permit merestone merestone nds infiltration unit outlet to revetment existing soil 1:3 max stone drain nicolock alta wall system 2.0 2.0 3.0 retainiing wall notes 1.nicolock alta wall system - pre-engineered retaining wall 2.blocks are 6"hx16"lx12"d 3.walls up to 3' exposed height require no soil reinforcement 4.approximate weight of wall unit is 49 pounds 5.wall base shall be a minimum of 1' below existing grade. stone base shall be a minimum of 6". 6.geogrid reinforcement shall be miragrid 3xt tencate or equivilent 7.geotextile shall be nonwoven skaps GT-160 or equal 8.for parallel walls within 12' horizontally of each other geogrid shall extend from face to face TYPICAL WALL SECTION 3' max NOT TO SCALE 108/30/26add work done after site visit 8/1/26 existing sanitary drywells typical 6.0 geogrid 1" 12" geogrid geogrid perforated wall drain may be at ground elev. perforated wall drain may be at ground elev. existing soil 1:3 max stone drain 6.0 Max 2.0 2.0 TYPICAL WALL SECTION 6' max NOT TO SCALE geotextile wrapped stone drain and base geotextile wrapped stone drain and base 2.5 screened run frame only chicken coop structure 198 sf garage existing main house 21.3 5.5 60.0 3.0 25.0 12.0 209/11/26add work done after 8/30/26 and add information requested by town INFILTRATION TRENCH - TYPICAL 3.0 3.0 4"Ø perforated pipe non-woven geotextile wrapped 3 8"-3 4" stone undisturbed earth geotextile wrapped stone drain and base geotextile wrapped stone drain and base electrical service 52.6 proposed pillars with lights typical proposed tree proposed shrub typical stone surface over utility proposed outdoor kitchen / grill / fireplace tbd 11.0 16.0 11.0 309/16/26add work outdoor kitchen location and notes 409/29/26adjust chicken coop dimensions, add silt fence at top of site, add plantings and list of plants PLANTINGS 1.the wetland review zone will be planted with a mixture of facultative wetland species (facw) and facultative species (fac) vegetation with the wetland species (facw) being closest to the wetlands in wet areas and the transition species (fac) being further from the wetland and drier areas. 2.the site shall be seeded with northeast native grass seed mix by New England Wetland Plants Inc. for permanent seeing at 1 #/1000 sf 3.if short term seeding is required use Fast Lawn by Ground Works at 1 #/ 700 sf 4.additional grasses, ferns, herbaceous plants, shrubs, and trees shall be native species 5.(fac) trees include: balsam fir, red maple, yellow birch, american hornbeam, gray birch, black gum, cottonwood, and american elm. (facw) trees include silver maple, river birch, green ash, eastern larch / tamarack, and pin oak. NO TREES SHALL BE PLANTED WITHIN 30' OF THE HOUSE. 6.(fac) shrubs include shadow berry / service berry, gray dogwood, common juniper, sheep laural, black chokeberry, pin azelea, and nanny berry. (facw) shrubs include silky dogwood, maleberry, red chokeberry, beb's willow, pussy willow, steeplebush, highbush berry, withe-rod / wild rasin, american cranberrry bush 7.(fac) herbaceous plants include big bluestem, flat-top goldenrod, foxglove beardtongue, golden alexander. (facw) herbaceous plants include painted broom sedge, tufted hairgrass, hollow stem joe-pye weed, trumpet weed, bottle gentian, spotted joe-pye weed, sneezeweek / helen's flower, cut-leafed green headed coreflower, fowl bluegrass 8.(facw) ferns include cinnamon fern, sensitive fern, ostrich fern 9.owner is responsible for coordinating the plantings to achieve the desired buffer and lanscape native plantings typical native plantings typical native plantings typical silt fence remove after vegetation is established silt fence remove after vegetation is established silt fence remove after vegetation is established
Minutes: archived copy, SHA-256 8fc2564e69a9…. Agenda: archived copy, SHA-256 c50899fe46d6…. Packet: archived copy, SHA-256 6fbe14d2f25f….