Towns / Simsbury / Conservation Commission/Inland Wetlands and Watercourses Agency / Oct 6, 2026
Conservation Commission/Inland Wetlands and Watercourses Agency, Oct 6, 2026
Simsbury Conservation Commission/Inland Wetlands and Watercourses Agency Hide agendas that already have minutesDocuments
| Type | Document | Pages | Open |
|---|---|---|---|
| minutesminutes | Conservation Commission/Inland Wetlands and Watercourses Agency Minutes | 3 | PDF download · town site |
| agenda | Conservation Commission/Inland Wetlands and Watercourses Agency | 1 | PDF download · town site |
| packetpacket | Conservation Commission/Inland Wetlands and Watercourses Agency (packet) | 21 | PDF download · town site |
Summary
Only a meeting packet is posted. Packets (the supporting documents) are archived and searchable but not summarized; open the PDF to read it.
Full text of the documents
View the minutes PDF on this page (Conservation Commission/Inland Wetlands and Watercourses Agency Minutes)
Text of the minutes (Conservation Commission/Inland Wetlands and Watercourses Agency Minutes, 3 pages)
Page 1 · open in PDF
Page 1 of 3 Conservation Commission / Inland Wetlands and Watercourses Agency 1 Regular Meeting 2 October 6, 2026 – 7:00 P.M. 3 Simsbury Town Hall 4 933 Hopmeadow St, Simsbury, CT 06070 5 6 MINUTES 7 8 I. CALL TO ORDER – Vice Chair Jason Levy called the meeting 7:00 P.M. 9 10 Present: Vice Chair Jason Levy; Commission Members: Charles 11 Haldeman, Don Eaton, Matthew Kelsey, and Michael Luzietti; Alternate 12 Commission Member : Alison Wilcox ; and Planning Director , George K. 13 McGregor. 14 15 Absent: Chair Margery Winters; Secretary Joe Campolieta; Alternate 16 Member Sue Brittell 17 18 Seating of Alternate: Commissioner Wilcox was seated as a regular 19 member for tonight’s meeting. 20 21 II. APPROVAL OF MINUTES 22 23 September 15, 2026 24 25 MOTION: Commissioner Luzietti made a motion, seconded by 26 Commissioner Haldeman, to approve the Minutes of September 15, 2026, 27 as written. 28 29 The motion carried unanimously (6-0-0). 30 31 III. IWWA APPLICATION(S) FOR RECEIPT AND DETERMINATION 32 OF SIGNIFICANCE 33 34 Application CC #26-21 of Michael Nascimento, applicant and owner, for 35 a wetland permit to construct a 16 x 22’ outbuilding and filling/grading in 36
Page 2 · open in PDF
Page 2 of 3 a regulated area in order to improve backyard conditions at 20 Neal Drive 37 (Assessor’s Map B18, Block 501, Lot 009) Simsbury, CT 06070, zone R -40 38 OS. 39 40 Mr. and Mrs. Nascimento, joined by their engineer, James Dempsey, 41 presented their request for a new wetlands permit at 20 Neal Dr. The 42 Commissioners asked several questions related to the expansion of the 43 project when compared to the original request in 2025. 44 45 MOTION: Commissioner Haldeman made a motion, seconded by 46 Commissioner Luzietti, to find the application non-significant, based upon 47 the proposed scope’s similarities with the original application, which was 48 also found to be not significant. Application CC 26-21 will be scheduled for 49 action on 10-20-26. 50 51 The motion carried unanimously (6-0-0). 52 53 IV. CONSERVATION COMMISSION BUSINESS 54 55 • Review of Rodenticide Policy Recommendation 56 57 MOTION: Commissioner Haldeman made a motion, seconded by 58 Commissioner Luzietti, to forward the draft Rodenticide Policy to the Board 59 of Selectmen for consideration. 60 61 The motion carried unanimously (6-0-0). 62 63 • Election of Officers 64 65 The Commission deferred action on Election of Officers. 66 67 V. DESIGNATED AGENT REQUEST FOR DETERMINATION 68 69 Application CC 26-20 of Mary Christine Wall, applicant and owner, for a 70 wetland permit to install a 16’ x 10’ shed in a regulated area at 294 Bushy 71 Hill (Assessor’s Map D15, Block 420, Lot 040) Simsbury, CT 06070, zone R-72 40 OS. 73 74 Planning Director McGregor asked the Commission to consider whether the 75 application met the guidance for a designated agent permit review or a 76 Commission-level permit review. 77 78 MOTION: Commissioner Haldeman made a motion, seconded by 79 Commissioner Luzietti, to find the application met the guidance for a 80
Page 3 · open in PDF
Page 3 of 3 commissioner-level review since the proposed shed was in wetlands soils. 81 Further, the application is found to be non-significant, based upon the small 82 size of the shed and the lack of proposed disturbance in the soils. 83 Application CC 26-20 would be scheduled for action on 10-20-26. 84 85 The motion carried unanimously (6-0-0). 86 87 88 VI. ADJOURNMENT 89 90 MOTION: Commissioner Haldeman made a motion, seconded by 91 Commissioner Wilcox, to adjourn the meeting. 92 93 The motion carried unanimously (6-0-0). 94 95 Chair Winters adjourned the meeting at 7:49 P.M. 96 97 Respectfully submitted, 98 99 George K. McGregor 100 Planning and Community Development Director 101
View the agenda PDF on this page (Conservation Commission/Inland Wetlands and Watercourses Agency)
Text of the agenda (Conservation Commission/Inland Wetlands and Watercourses Agency, 1 page)
Page 1 · open in PDF
CC/IWWA 10/6/2026 Meeting Agenda 10-6-26 AGENDA.PDF CC 26-21 20 Neal Drive CC 26-21 20 NEAL DRIVE APPLICATION, NARRATIVE, AND SITE PLAN - REDACTED.PDF CC 26-20 298 Bushy Hill Road CC 26-20 298 BUSHY HILL RD APPLICATION AND PLOT PLAN - REDACTED.PDF 1. Documents: 2. Documents: 3. Documents:
View the packet PDF on this page (Conservation Commission/Inland Wetlands and Watercourses Agency (packet))
Text of the packet (Conservation Commission/Inland Wetlands and Watercourses Agency (packet), 21 pages)
Page 1 · open in PDF
CC/IWWA 10/6/2026 Meeting Agenda 10-6-26 AGENDA.PDF CC 26-21 20 Neal Drive CC 26-21 20 NEAL DRIVE APPLICATION, NARRATIVE, AND SITE PLAN - REDACTED.PDF CC 26-20 298 Bushy Hill Road CC 26-20 298 BUSHY HILL RD APPLICATION AND PLOT PLAN - REDACTED.PDF 1. Documents: 2. Documents: 3. Documents:
Page 2 · open in PDF
Page 1 of 1 Conservation Commission/Inland Wetlands and Watercourses Agency Regular Meeting October 6, 2026, at 7:00 PM Town Hall, Main Meeting Room 933 Hopmeadow Street, Simsbury, CT, 06070 AGENDA I. CALL TO ORDER & ROLL CALL II. SEATING OF ALTERNATES III. APPROVAL OF MINUTES • September 15, 2026 IV. IWWA APPLICATION(S) FOR RECEIPT AND DETERMINATION OF SIGNIFICANCE • Application CC #26- 21 of Michael Nascimento, applicant and owner, for a wetland permit to construct a 16 x 22’ outbuilding and filling/grading in a regulated area in order to improve backyard conditions at 20 Neal Drive (Assessor’s Map B18, Block 501, Lot 009) Simsbury, CT 06070, zone R-40 OS. V. PUBLIC HEARING OR VOTE • None VI. CONSERVATION COMMISSION AND IWWA BUSINESS • Review of Draft Policy on Rodenticide Use on Town-Owned Land • Election of Officers VII. DESIGNATED AGENT REQUEST FOR DETERMINATION • Application CC 26-20 of Mary Christine Wall, applicant and owner, for a wetland permit to install a 16’ x 10’ shed in a regulated area at 294 Bushy Hill (Assessor’s Map D15, Block 420, Lot 040) Simsbury, CT 06070, zone R-40 OS. VIII. ADJOURNMENT
Page 3 · open in PDF
Page 4 · open in PDF
2 of 4 INSTRUCTIONS FOR APPLICANT Any person seeking a permit to carry out a regulated activity on property which has been designated an inland wetland or watercourse by the Conservation Commission or within the 100- foot regulated buffer area of a designated inland wetland or watercourse must complete and submit the Inland Wetlands Permit Application to the Planning Department. Submission shall occur by the day before a regular meeting of the Conservation Commission. (See Section 5 of the Inland Wetlands and Watercourses Regulations of the Town of Simsbury.) Application will be heard at the following meeting, after petition period. The original application shall be submitted with five (5) copies. Maps on sheets larger than 11”x14” shall be submitted in at least three (3) copies. Additional copies of site plans may be required. PDFs of the maps, if available, should be submitted, as well. PDFs can be emailed to jhollis@simsbury-ct.gov. A filin g fee shall accompany the application , as required b y the Land Use Application Fees schedule. Please consult with the Planning Office for specific fee determination. The following information shall be provided on white paper (8 ½”x11”) and typewritten. Reproduce the following questions along with the answer and attach to the application. 1. In the case of a public hearing or map amendment, list on a separate sheet of paper the names and addresses of all abutting property owners and property owners within 100 feet of all property lines. Identify on one of the attached maps. 2. Describe the site and the regulated area or wetlands/watercourses involved: a. General site conditions, including vegetation and general soil conditions. b. Size of wetland within site or distance of the activity from the wetland. c. Size of total contiguous wetland. d. Position relative to other wetlands on site. e. Type of wetland characterized by vegetative and soil type and/or watercourse, such as: 1) open/deep fresh water pond or lake; 2) shallow marsh; 3) seasonally flooded basins and flats; 4) meadow; 5) shrub swamp; 6) wooded swamp; 7) bog; 8) kettle; 9) stream type; 10) other.
Page 5 · open in PDF
3 of 4 3. Depth to water table, depth to mottled soil, and seasonal variation of water table. 4. Describe the immediate impact on the wetlands and watercourses, including, but not limited to: a. Quantities, by volume and area disturbed, of materials to be removed, deposited, or altered. b. Kinds of materials by soil types and vegetative classifications, and materials classification to be removed, deposited, or altered. c. Percent of wetlands/watercourses disturbed or altered to total area of wetlands/watercourses on the parcel. 5. Describe the related construction activities and their impact on: a. Area and location of wetlands and watercourses. b. Types and amounts of vegetation. c. Surface and groundwater. d. Visual impacts. e. Wildlife habitats. 6. Describe the long term or permanent impact of the activity(ies) on environmental aspects, such as the surface and groundwater quality, storm water runoff, visual impact(s), or wildlife habitats on: a. Wetlands and/or watercourses. b. Abutting riparian properties and/or wetlands and/or watercourses. 7. Identify sedimentation and erosion control measures to be used. 8. Identify alternatives to the proposed activity that were considered, including alternative sites and why this one was chosen. 9. Estimate cost of work and time for completion. 10. Attach drainage calculations and other reports as indicated to substantiate the statements made above. 11. REQUIRED MAPS a. Attach a vicinity map on an 8 ½”x11” sheet at scale 1”=200’ or 1’=800’ (depending upon the size of the parcel) showing the general location of the area in which the regulated activity is proposed. The map should be in sufficient detail to allow the identification of the property on the official Inland Wetlands and Watercourses map. A guide to the kinds of information to be shown is available in the Planning Department at the Town Hall.
Page 6 · open in PDF
4 of 4 b. Site Plan(s) showing: i. The topography showing contours at intervals of not more than two (2) feet and a minimum of two (2) contour marks per ten (10) acres at a scale of 1”=100’ or 1”=40’ (whichever is more appropriate). ii. Location of existing watercourses and/or ponds. iii. Location of regulated activity. iv. Proposed grading and/or filling. v. Proposed drainage, site utilities, wells, etc. vi. Sedimentation and erosion control measures. 12. The Applicant shall certify whether: a. Any portion of the property on which the regulated activity is proposed is located within 500 feet of the boundary of an adjoining municipality. b. Traffic attributable to the completed project on the site will use streets within the adjoining municipality to enter or exit the site. c. Sewer or water drainage from the project site will flow through and affect the sewage or drainage system within the adjoining municipality or d. Water runoff from the improved site will affect streets or other municipal or private property within the adjoining municipality. e. Documentation that notice of the pending application was provided to the adjacent municipality (certified mail, return receipt requested) on the same day of filing an inland wetland permit application with the Town of Simsbury. f. The property is subject to a conservation restriction or preservation restriction, and, if so, what party or parties are holders thereof or intended to be benefitted thereby. ALL INFORMATION MUST BE COMPLETED TO THE EXTENT INDICATED BY THE COMMISSION BEFORE ANY ACTION IS TAKEN ON THE PERMIT APPLICATION. INCOMPLETE APPLICATIONS WILL BE DENIED. ADDITIONAL INFORMATION MAY BE REQUIRED BY THE COMMISSION. THE APPLICANT AND/OR AUTHORIZED AGENT SHOULD ATTEND THE CONSERVATION COMMISSION/INLAND WETLANDS & WATERCOURSES AGENCY MEETING IN ORDER FOR A DECISION TO BE RENDERED. IF APPLICANT OR AGENT DOES NOT ATTEND, AND QUESTIONS ARISE, DECISION ON APPLICATION MAY BE DEFERRED OR DENIED.
Page 7 · open in PDF
J K Dempsey Engineering PLLC 308 New London Turnpike Stonington, CT 06378 Michael Nascimento Residence 20 Neal Drive, Simsbury, CT Community Planning and Development Inland Wetlands Permit Application New Permit JKDE Project No.: 012325 Prepared by James K Dempsey, PE September 29, 2026
Page 8 · open in PDF
J K Dempsey Engineering, PLLC 20 Neal Drive, Simsbury, CT Inland Wetlands Permit R1 JKDE No.: 012325 Page 2 Description: On May 8, 2025 the owner of the property at 20 Neal Drive received a permit, CC#25-13, for regulated activities within the 100’ upland review area and minor activities within the wetland located at the rear of the property. The project included the regrading, installation of fill, removal of vegetation, installation of stone revetment, installation of paving stones, and the installation of ADA compliant paths for access to the constructed patio area at the rear of the house as depicted below. Regulated Activities: Regulated activities at the site will include: Installation of erosion and sediment controls The cutting of vegetation along the wetlands to allow the formation of the revetment toe Installation of riprap revetment, filter stone, and geotextile fabric Installation of drainage pipe, infiltration units, and infiltration trench Installation of approximately 700 cubic yards of clean, free draining fill Installation of hardscape patio surface level with the door entry at the rear of the house Installation of plantings and fence at the top of the revetment Installation of ADA surfaces to allow access from the front of the house to the rear Installation of retaining walls Installation of outbuilding – chicken coop Construction began in the fall of 2025 with the installation of sediment controls, removal of trees, removal of existing paving stones, removal of vegetation in the wetland disturbance area as depicted in the permit application, and rough grading. The project was forced to stop work because of the winter weather. In the spring, the contractor who began the construction did not return to continue the work and the owner was forced to hire another contractor to continue the project. The owner determined the project, as permitted, was not fulfilling his needs. Deviations from the permit were then undertaken to extend the fill areas to the north and south applying the same design concepts and creating areas of less slope that the owner can traverse in his wheel chair. A retaining wall was installed with steps to traverse between the two filled areas creating an upper and lower lawn area at the rear and south side of the house. The paved patio depicted in the original permit was moved to the north at a higher elevation which will provide easier access for the owner. The area of the original patio will now be lawn except for a small paver block entry patio to the lower sliding door. As construction continued, other improvements were made including the installation of a double retaining wall at the north side of the property required to retain soil previously retained by a dilapidated block wall and vegetation. The fill and revetment on the south side of the property extended to the property line and returned to create a level lawn on the south side of the house. A retaining wall was installed mid-slope at the south of the house adjacent to the existing
Page 9 · open in PDF
J K Dempsey Engineering, PLLC
20 Neal Drive, Simsbury, CT
Inland Wetlands Permit R1 JKDE No.: 012325
Page 3
retaining wall to terrace the land and reduce runoff. At the request of the south property owner,
an infiltration trench was installed at the south side of the property to collect runoff water before
it could enter the property to the south. A chicken coop structure is under construction on the
south side of the property.
Near the end of July, 2026, Brittany MacGilpin – Assistant Town Planner / Wetlands
Designated Agent, visited the property. The owner was informed that the construction appeared
to violate the current wetland permit application. The Town asked the owner to retain an
engineer to produce plans and documents that would depict the scope of the original permit and
the scope of the existing construction. Some construction continued until the end of August. A
Stop Work Order was issued by the Town on September 1, 2026.
In this new application the owner requests approval of the extended proposed
improvements within the wetlands upland review area. Since the last meeting, additional silt
fence has been installed at the top of the revetment slope to retain sediment from moving onto
the slope and into the wetland. Approvals for the proposed structures including the walls, patio,
and outbuilding have been obtained from the building department awaiting approval of those
improvements within the wetlands upland review area.
Section 1: Abutters
In the event of a public hearing or map amendment, the following is a list of abutting
property owners and property owners within 100 feet of the subject property’s lines.
Town of Simsbury Kimberly A Steele Leroy T. Lawson
Simsbury, CT 06070 22 Neal Drive 18 Neal Drive
Simsbury, CT 06070 Simsbury, CT 06070
Gregory Wooley & Eric L. & William Brian &
Kathryn Ritz Kristen Ferguson Pavla K. Fischer
17 Neal Drive 19 Neal Drive 28 Drumlin Road
Simsbury, CT 06070 Simsbury, CT 06070 West Simsbury, CT 06092
Robert N. & Francis Peter &
Lori F. Blomberg Margaret Sexton
21 Neal Drive 26 Drumlin Road
Simsbury, CT 06070 West Simsbury, CT 06092
Section 2: Regulated Area / Wetland or Watercourse
a. Reed marsh associated with the north tributary to Nod Brook. The site consists of
wetland soils and hosts facultative (FAC) and facultative wetland (FACW) species of
shrubs, plants, and trees along the edges with dense Phragmites making up the
majority of the vegetation in the marsh.
b. Approximately 0.15 acres of the site contains wetlands
c. The total size of the contiguous wetland is approximately 60 acres with approximately
200’ aligned with this project site.
d. The begins at the bottom of the slope in the rear of the house.
e. Wetland described as Shallow marsh Page 10 · open in PDF
J K Dempsey Engineering, PLLC 20 Neal Drive, Simsbury, CT Inland Wetlands Permit R1 JKDE No.: 012325 Page 4 Section 3: Water Table The water table is approximately 6” below the surface at the bottom of the slope where the revetment would be installed. The elevation is estimated to be 265.5’. The seasonal water table change is estimated to be 6”. Section 4: Impact to Wetlands a. Deposition of approximately 300 CY of fill over 1600 SF 837 CY over 3500 SF b. There will be no fill removed from the site. Fill quantities are as follows: i. Riprap 90 cy 135 ton ii. ¾” Stone 50cy 75 ton iii. Fill 697 cy 1046 ton iv. Geotextile Fabric 350 sy c. Approximately 250 sf or wetland will be permanently altered. The wetland area on the parcel is about 7,840 sf. The disturbance percentage altered permanently is 3.2%. Section 5: Construction Activities a. The construction activities for the revetment and majority of fill will take place immediately upland of the wetland border. The activity nearest the wetland will take place along a 200’ long area. b. 3-4 midsize bushes and six trees and several shrubs will be removed to install the revetment adjacent to the wetland. One larger tree, further from the wetland may need to be removed. Phragmites in the disturbed wetland area, 200 sf will need to be removed for silt fence installation. Several trees and shrubs will be removed from the north side yard. c. Surface and groundwater will be directed to the sides of the construction area while the construction activities are taking place. Groundwater is not expected to be an issue and there is no plans for dewatering or redirecting groundwater. At the request of the south neighbor, Kimberly Steele, an infiltration trench will be installed at the bottom of the slope of the south side yard to catch any runoff coming toward her property and infiltrate it into the soil. The trench is three feet wide by three feet deep by sixty feet long running east to west. d. Visual impacts have been minimal for the work in the review area however, the construction of the improvements on the upside of the house has had greater visual impact from the street. e. Wildlife habitat has been minimally impacted during construction. Section 6: Permanent Impact of Proposed Activities a. The permanent impact of the proposed activities will be minimal over the existing conditions. The project will reduce the grade of a large area of rear yard and side yards at the residence allowing for longer “time of concentrations” for the runoff. It will also reduce velocity of the runoff. It will address soil erosion issues caused by the steeper grade and sparce vegetation that had been taking place. The installation of the roof drain pipes and infiltrators will allow for infiltration and slower, more directed movements of the roof runoff. The addition of native plantings along the
Page 11 · open in PDF
J K Dempsey Engineering, PLLC 20 Neal Drive, Simsbury, CT Inland Wetlands Permit R1 JKDE No.: 012325 Page 5 top of the stone revetment will work to trap sediment that may be transported in rills toward the wetland. The project will improve the overall visual aspect of the property and allow the owner to enjoy his outdoor environment. The existing and proposed improvements are not expected to have al permanent impact on the wetlands once construction is completed and vegetation is established. b. The abutting riparian properties and/or wetlands and/or watercourse is expected to have a positive benefit from this project. The property currently has erosion issues with little or no retention of roof drain water. This project is expected to improve water quality in the marsh and book by reducing sediment from the property. It will also reduce velocities of runoff and allow longer times of concentration. Section 7: Sediment and Erosion Controls The contractor has been required to install a row of silt fence on the lower extents of the construction activity site and shall maintain the silt fence for the duration of the project. In addition, a row of silt fence has been installed at the top of the revetment slope and will remain during construction and until vegetation is established. The silt fence shall be inspected after each rain event and at least weekly. Section 8: Alternatives The alternative to the proposed activities considered for this project included a raised deck. This option is less attractive as it does not address the erosion issue taking place at the property. The drainage system could be installed but without changing the slope and installing less erodible surface treatments it will continue to degrade. The construction impact would be similar during construction of a raised deck as with the proposed construction. The proposed option is also thought to be less expensive to maintain. Section 9: Cost Estimation and Time to Construct The estimated cost of construction of this project is $120,000.00. The duration of the construction activities is expected to be twelve months. Section 10: Calculations and Reports No drainage calculations or other reports have been prepared at this time for this project. Section 11: Maps, Site Plan, Proposed and Existing Drawings, and Photos See attached. Section 12: Applicant Certifications a. Any portion of the property on which the regulated activity is proposed is located within 500 feet of the boundary of an adjoining municipality. It does not – N/A b. Traffic attributable to the completed project on the site will use streets within the adjoining municipality to enter or exit the site. Yes, for deliveries and mobilization / demobilization c. Sewer or water drainage from the project site will flow through and affect the sewage or drainage system within the adjoining municipality. No
Page 12 · open in PDF
J K Dempsey Engineering, PLLC
20 Neal Drive, Simsbury, CT
Inland Wetlands Permit R1 JKDE No.: 012325
Page 6
d. Water runoff from the improved site will affect streets or other municipal or private
property within the adjoining municipality.
No
e. Documentation that notice of the pending application was provided to adjacent
municipality (certified mail, return receipt requested) on the same day of filing an
inland wetland permit application with the Town of Simsbury.
N/A
f. The property is subject to a conservation restriction or preservation restriction, and, if
so, what party or parties are holders thereof or intended to be benefitted thereby.
N/A
Photos:
Pre-Construction Back Yard Pre-Construction Back Yard
Pre-Construction Backyard Pre-Construction Backyard
Page 13 · open in PDF
J K Dempsey Engineering, PLLC
20 Neal Drive, Simsbury, CT
Inland Wetlands Permit R1 JKDE No.: 012325
Page 7
Pre-Construction North Side Yard New Entry Patio Backyard
Side Yard Retaining Walls Back Yard – Upper Yard
Page 14 · open in PDF
J K Dempsey Engineering, PLLC
20 Neal Drive, Simsbury, CT
Inland Wetlands Permit R1 JKDE No.: 012325
Page 8
Backyard Paver Patio Area Backyard
South Side Yard Revetment Backyard Revetment
Page 15 · open in PDF
J K Dempsey Engineering, PLLC
20 Neal Drive, Simsbury, CT
Inland Wetlands Permit R1 JKDE No.: 012325
Page 9
Backyard Retaining Wall South Side Yard Retaining Wall
South Side Yard Infiltration Trench
Page 16 · open in PDF
J K Dempsey Engineering, PLLC
20 Neal Drive, Simsbury, CT
Inland Wetlands Permit R1 JKDE No.: 012325
Page 10
Walls at Front of House Walls at Front of House
Vision – Back Yard at Paver Patio Vision – Top of Revetment
Page 17 · open in PDF
J K Dempsey Engineering, PLLC
20 Neal Drive, Simsbury, CT
Inland Wetlands Permit R1 JKDE No.: 012325
Page 11
Vision – Driveway from Neal Drive Vision – Front from Neil Drive
Vision – From End of Neil Drive Vision – Upper Yard and Patio
Page 18 · open in PDF
PROPERTY OFSTEELE, KIMBERLY A.22 NEAL DRIVE PROPERTY OFLAWSON, LEROY T18 NEAL DRIVE 266.00 267.00 268.00 269.00 270.00 275.00 276.00 277.00 278.00 278.00 280.00 281.00 282.00 283.00 284.00 288.00 290.00 285.00 287.00 289.00 290.00 293.00 294.00 290.00 284.00 273.00 275.00 270.00 272.00 270.00 266.00 275.00 280.00 284.00 285.00 287.00 288.00 272.00 273.00 284.00284.00 -61.1% -68.8% -72.3% -82.0% -67.7% 96.2 Date NoRevision 308 New London Turnpike, Stonington, CT 06378 (860) 405-7020 Michael Nascimento Residence 20 Neal Drive Existing Conditions 08/01/26 & Proposed Improvements GP1 J.K. Dempsey Engineering PLLC Date:August 30, 20261"=10' Scale: Project #: JKDE #: 080126 parcel information location20 neil drive useresidential id30762000 map block lotB18 501 009 acres0.5100 zoningR40OS volume/page7 ZONE: R-40osrequired MINIMUM LOT AREA existing 30,000 SF MINIMUM LOT WIDTH150'150' 30555 SF MINIMUM FRONT YARD50' MINIMUM SIDE YARD MINIMUM REAR YARD 25' - MAXIMUM HEIGHT35'35' 52.6' 44.5' & 26' 8.2% 50'79' BUILDING COVERAGE MAXIMUM (IMPERVIOUS SURFACE) COVERAGE-13.8% proposed 150' 30555 SF 35' 52.6' 44.5 & 26' 9.1% 79' 24.8% Feet 01020 17.6 existing main house proposed paver entry 6' high retaining wall and steps stone revetment retaining walls alta block by nicolock 4' high max typical retaining walls alta block by nicolock 3'-6' high max grass typical existing retaining wall mailbox approximate property line approximate property line approximate property line grass typical NOTES 1.property survey taken from subdivision plan: "final subdivision plan rosewood estates property of a.a.sasportas builders, inc. bushy hill road, simsbury connecticut scale 1"=100' july 19, 1971 office of sanderson & washburn, simsbury connecticut r-40 open space zone" 2.existing topographic data taken from 2023 state lidar survey 3.new topographic data recorded by JKDE 8/1/26 4.all coordinates refer to connecticut state plane nad 83 us survey foot. all elevations refer to navd 88 in us survey foot. 5.wetland line taken from the town of simsbury, connecticut "town acad wetland map 2014" 6.existing fill is bare earth with no veggitation 7.original design revetment slope 1v:1.5h typical = 66.6% 8.revetment construction is earth separated with geotextile and stone cover - varies from original design wetlands typical wetland boundry town map wetland boundry town map road frontage line from subdivision drawing 4' high fence proposed typical 78.9 26.0 44.5 catch basin stone surface proposed to be asphalt existing asphalt surface existing subsurface septic system extent of disturbance from wetland permit extend of disturbance from wetland permit top of slope bottom of slope bottom of slope bottom of slope top of slope top of slope apparent fill area over property line lower lawn upper lawn paver area mid-wall upper wall driveway area cut-fill report locationarea (sf)cut (cy)fill (cy)net (cy) lower lawn615059326267 fill upper lawn30870646646 fill paver area21794414197 fill upper wall500055 fill lower wall47225223 cut drive area42831563153 cut total166712841123839 fill the original wetlands permit was based on the following fill schedule. riprap45cy 3 4" stone25cy fill230cy total300cy over 1600 sf nds infiltration unit outlet to revetment nds infiltration unit overflow to revetment 100' wetlands review line 100' wetlands review line 3" asphalt curb existing well infiltration trench added since site vist approximate location retaining wall added since site visit approximate location 4'-5' height extent of disturbance from wetland permit merestone merestone nds infiltration unit outlet to revetment existing soil 1:3 max stone drain nicolock alta wall system 2.0 2.0 3.0 retainiing wall notes 1.nicolock alta wall system - pre-engineered retaining wall 2.blocks are 6"hx16"lx12"d 3.walls up to 3' exposed height require no soil reinforcement 4.approximate weight of wall unit is 49 pounds 5.wall base shall be a minimum of 1' below existing grade. stone base shall be a minimum of 6". 6.geogrid reinforcement shall be miragrid 3xt tencate or equivilent 7.geotextile shall be nonwoven skaps GT-160 or equal 8.for parallel walls within 12' horizontally of each other geogrid shall extend from face to face TYPICAL WALL SECTION 3' max NOT TO SCALE 108/30/26add work done after site visit 8/1/26 existing sanitary drywells typical 6.0 geogrid 1" 12" geogrid geogrid perforated wall drain may be at ground elev. perforated wall drain may be at ground elev. existing soil 1:3 max stone drain 6.0 Max 2.0 2.0 TYPICAL WALL SECTION 6' max NOT TO SCALE geotextile wrapped stone drain and base geotextile wrapped stone drain and base 2.5 screened run frame only chicken coop structure 198 sf garage existing main house 21.3 5.5 60.0 3.0 25.0 12.0 209/11/26add work done after 8/30/26 and add information requested by town INFILTRATION TRENCH - TYPICAL 3.0 3.0 4"Ø perforated pipe non-woven geotextile wrapped 3 8"-3 4" stone undisturbed earth geotextile wrapped stone drain and base geotextile wrapped stone drain and base electrical service 52.6 proposed pillars with lights typical proposed tree proposed shrub typical stone surface over utility proposed outdoor kitchen / grill / fireplace tbd 11.0 16.0 11.0 309/16/26add work outdoor kitchen location and notes 409/29/26adjust chicken coop dimensions, add silt fence at top of site, add plantings and list of plants PLANTINGS 1.the wetland review zone will be planted with a mixture of facultative wetland species (facw) and facultative species (fac) vegetation with the wetland species (facw) being closest to the wetlands in wet areas and the transition species (fac) being further from the wetland and drier areas. 2.the site shall be seeded with northeast native grass seed mix by New England Wetland Plants Inc. for permanent seeing at 1 #/1000 sf 3.if short term seeding is required use Fast Lawn by Ground Works at 1 #/ 700 sf 4.additional grasses, ferns, herbaceous plants, shrubs, and trees shall be native species 5.(fac) trees include: balsam fir, red maple, yellow birch, american hornbeam, gray birch, black gum, cottonwood, and american elm. (facw) trees include silver maple, river birch, green ash, eastern larch / tamarack, and pin oak. NO TREES SHALL BE PLANTED WITHIN 30' OF THE HOUSE. 6.(fac) shrubs include shadow berry / service berry, gray dogwood, common juniper, sheep laural, black chokeberry, pin azelea, and nanny berry. (facw) shrubs include silky dogwood, maleberry, red chokeberry, beb's willow, pussy willow, steeplebush, highbush berry, withe-rod / wild rasin, american cranberrry bush 7.(fac) herbaceous plants include big bluestem, flat-top goldenrod, foxglove beardtongue, golden alexander. (facw) herbaceous plants include painted broom sedge, tufted hairgrass, hollow stem joe-pye weed, trumpet weed, bottle gentian, spotted joe-pye weed, sneezeweek / helen's flower, cut-leafed green headed coreflower, fowl bluegrass 8.(facw) ferns include cinnamon fern, sensitive fern, ostrich fern 9.owner is responsible for coordinating the plantings to achieve the desired buffer and lanscape native plantings typical native plantings typical native plantings typical silt fence remove after vegetation is established silt fence remove after vegetation is established silt fence remove after vegetation is established
Page 19 · open in PDF
Page 20 · open in PDF
Page 21 · open in PDF
Minutes: archived copy, SHA-256 14d91f42eb07…. Agenda: archived copy, SHA-256 d5f4ef476787…. Packet: archived copy, SHA-256 f90f3e9529b0….