CT Public Docs Tracker

Towns / Simsbury / Conservation Commission/Inland Wetlands and Watercourses Agency / Oct 6, 2026

Conservation Commission/Inland Wetlands and Watercourses Agency, Oct 6, 2026

Simsbury minutes posted

Documents

TypeDocumentPagesOpen
minutes Conservation Commission/Inland Wetlands and Watercourses Agency Minutes 3 PDF download · town site
agenda Conservation Commission/Inland Wetlands and Watercourses Agency 1 PDF download · town site
packet Conservation Commission/Inland Wetlands and Watercourses Agency (packet) 21 PDF download · town site

Summary

Only a meeting packet is posted. Packets (the supporting documents) are archived and searchable but not summarized; open the PDF to read it.

Full text of the documents

View the minutes PDF on this page (Conservation Commission/Inland Wetlands and Watercourses Agency Minutes) Open the PDF
Text of the minutes (Conservation Commission/Inland Wetlands and Watercourses Agency Minutes, 3 pages)

Page 1 · open in PDF

 
 
 
 
   
   
 
 
 
Page 1 of 3 
 
Conservation Commission / Inland Wetlands and Watercourses Agency 1 
Regular Meeting 2 
October 6, 2026 – 7:00 P.M. 3 
Simsbury Town Hall 4 
933 Hopmeadow St, Simsbury, CT 06070 5 
 6 
MINUTES 7 
 8 
I. CALL TO ORDER – Vice Chair Jason Levy called the meeting 7:00 P.M.  9 
 10 
Present: Vice Chair Jason Levy; Commission Members:  Charles 11 
Haldeman, Don Eaton, Matthew Kelsey, and Michael Luzietti; Alternate 12 
Commission Member : Alison Wilcox ; and Planning Director , George K. 13 
McGregor. 14 
 15 
Absent: Chair Margery Winters;  Secretary Joe Campolieta; Alternate 16 
Member Sue Brittell 17 
 18 
Seating of Alternate: Commissioner Wilcox was seated as a regular 19 
member for tonight’s meeting.  20 
 21 
II. APPROVAL OF MINUTES 22 
 23 
September 15, 2026 24 
 25 
MOTION: Commissioner Luzietti made a motion, seconded by 26 
Commissioner Haldeman, to approve the Minutes of September 15, 2026, 27 
as written.  28 
 29 
The motion carried unanimously (6-0-0). 30 
 31 
III. IWWA APPLICATION(S) FOR RECEIPT AND DETERMINATION 32 
OF SIGNIFICANCE 33 
 34 
Application CC #26-21 of Michael Nascimento, applicant and owner, for 35 
a wetland permit to construct a 16 x 22’ outbuilding and  filling/grading in 36 

Page 2 · open in PDF

Page 2 of 3 
 
a regulated area in order to improve backyard conditions at 20 Neal Drive  37 
(Assessor’s Map B18, Block 501, Lot 009) Simsbury, CT 06070, zone R -40 38 
OS. 39 
 40 
Mr. and Mrs. Nascimento, joined by their engineer, James Dempsey, 41 
presented their request for a new wetlands permit at 20 Neal Dr.  The 42 
Commissioners asked several questions related to the expansion of the 43 
project when compared to the original request in 2025. 44 
 45 
MOTION: Commissioner Haldeman  made a motion, seconded by 46 
Commissioner Luzietti, to find the application non-significant, based upon 47 
the proposed scope’s similarities with the original application, which was 48 
also found to be not significant. Application CC 26-21 will be scheduled for 49 
action on 10-20-26. 50 
 51 
The motion carried unanimously (6-0-0). 52 
 53 
IV. CONSERVATION COMMISSION BUSINESS 54 
 55 
• Review of Rodenticide Policy Recommendation 56 
 57 
MOTION: Commissioner Haldeman made a motion, seconded by  58 
Commissioner Luzietti, to forward the draft Rodenticide Policy to the Board 59 
of Selectmen for consideration. 60 
 61 
The motion carried unanimously (6-0-0). 62 
 63 
• Election of Officers 64 
 65 
The Commission deferred action on Election of Officers. 66 
 67 
V. DESIGNATED AGENT REQUEST FOR DETERMINATION  68 
 69 
Application CC 26-20 of Mary Christine Wall, applicant and owner, for a 70 
wetland permit to install a 16’ x 10’ shed in a regulated area at 294 Bushy 71 
Hill (Assessor’s Map D15, Block 420, Lot 040) Simsbury, CT 06070, zone R-72 
40 OS.  73 
 74 
Planning Director McGregor asked the Commission to consider whether the 75 
application met the guidance for a designated agent permit review or a 76 
Commission-level permit review. 77 
 78 
MOTION: Commissioner Haldeman made a motion, seconded by 79 
Commissioner Luzietti, to find the application met the guidance for a 80 

Page 3 · open in PDF

Page 3 of 3 
 
commissioner-level review since the proposed shed was in wetlands soils. 81 
Further, the application is found to be non-significant, based upon the small 82 
size of the shed and the lack of proposed disturbance in the soils. 83 
Application CC 26-20 would be scheduled for action on 10-20-26. 84 
 85 
The motion carried unanimously (6-0-0). 86 
 87 
 88 
VI. ADJOURNMENT  89 
 90 
MOTION: Commissioner Haldeman made a motion, seconded by 91 
Commissioner Wilcox, to adjourn the meeting.  92 
 93 
The motion carried unanimously (6-0-0). 94 
 95 
Chair Winters adjourned the meeting at 7:49 P.M. 96 
 97 
Respectfully submitted,  98 
 99 
George K. McGregor 100 
Planning and Community Development Director 101 
View the agenda PDF on this page (Conservation Commission/Inland Wetlands and Watercourses Agency) Open the PDF
Text of the agenda (Conservation Commission/Inland Wetlands and Watercourses Agency, 1 page)

Page 1 · open in PDF

CC/IWWA 10/6/2026 Meeting Agenda
10-6-26 AGENDA.PDF
CC 26-21 20 Neal Drive 
CC 26-21 20 NEAL DRIVE APPLICATION, NARRATIVE, AND SITE PLAN -
REDACTED.PDF
CC 26-20 298 Bushy Hill Road
CC 26-20 298 BUSHY HILL RD APPLICATION AND PLOT PLAN -
REDACTED.PDF
1.
Documents:
2.
Documents:
3.
Documents:
View the packet PDF on this page (Conservation Commission/Inland Wetlands and Watercourses Agency (packet)) Open the PDF
Text of the packet (Conservation Commission/Inland Wetlands and Watercourses Agency (packet), 21 pages)

Page 1 · open in PDF

CC/IWWA 10/6/2026 Meeting Agenda
10-6-26 AGENDA.PDF
CC 26-21 20 Neal Drive 
CC 26-21 20 NEAL DRIVE APPLICATION, NARRATIVE, AND SITE PLAN -
REDACTED.PDF
CC 26-20 298 Bushy Hill Road
CC 26-20 298 BUSHY HILL RD APPLICATION AND PLOT PLAN -
REDACTED.PDF
1.
Documents:
2.
Documents:
3.
Documents:

Page 2 · open in PDF

 
 
 
 
   
   
 
 
 
Page 1 of 1 
 
Conservation Commission/Inland Wetlands and Watercourses Agency 
Regular Meeting  
October 6, 2026, at 7:00 PM 
Town Hall, Main Meeting Room 
933 Hopmeadow Street, Simsbury, CT, 06070 
AGENDA 
 
I.  CALL TO ORDER & ROLL CALL 
 
II.  SEATING OF ALTERNATES 
 
III.  APPROVAL OF MINUTES 
• September 15, 2026 
 
IV. IWWA APPLICATION(S) FOR RECEIPT AND DETERMINATION 
OF SIGNIFICANCE 
• Application CC #26- 21 of Michael Nascimento, applicant and 
owner, for a wetland permit to construct a 16 x 22’ outbuilding and  
filling/grading in a regulated area in order to improve backyard 
conditions at 20 Neal Drive (Assessor’s Map B18, Block 501, Lot 009) 
Simsbury, CT 06070, zone R-40 OS. 
 
V. PUBLIC HEARING OR VOTE 
• None 
 
VI. CONSERVATION COMMISSION AND IWWA BUSINESS 
• Review of Draft Policy on Rodenticide Use on Town-Owned Land 
• Election of Officers 
 
VII.  DESIGNATED AGENT REQUEST FOR DETERMINATION  
• Application CC 26-20 of Mary Christine Wall, applicant and owner, 
for a wetland permit to install a 16’ x 10’ shed in a regulated area at 
294 Bushy Hill (Assessor’s Map D15, Block 420, Lot 040) Simsbury, 
CT 06070, zone R-40 OS.  
 
VIII.  ADJOURNMENT 
 

Page 3 · open in PDF

Page 4 · open in PDF

2 of 4 
INSTRUCTIONS FOR APPLICANT 
Any person seeking a permit to carry  out a regulated  activity on  property which  has  been 
designated an inland wetland or watercourse by the Conservation Commission or within the 100-
foot regulated buffer area of a designated inland  wetland or watercourse  must  complete  and 
submit the Inland Wetlands Permit Application to the Planning Department. 
Submission shall occur by the day before a regular meeting of the Conservation Commission. (See 
Section 5 of the Inland Wetlands and  Watercourses Regulations  of  the Town  of  Simsbury.) 
Application will be heard at the following meeting, after petition period. 
The 
original application shall be submitted with five (5) copies. Maps on sheets larger than
11”x14” shall be submitted in  at  least  three  (3)  copies.  Additional copies  of site  plans  may  be 
required. PDFs of the maps, if available, should be submitted, as well. PDFs can be emailed to 
jhollis@simsbury-ct.gov.
A filin g fee shall accompany the application , as required b y the Land Use Application Fees 
schedule. Please consult with the Planning Office for specific fee determination. 
The following information shall be provided on white paper (8 ½”x11”) and typewritten. 
Reproduce the following questions along with the answer and attach to the application. 
1. In the case of a public hearing or map amendment, list on a separate sheet of paper the
names and addresses of all abutting property owners and property owners within 100 feet
of all property lines. Identify on one of the attached maps.
2. Describe the site and the regulated area or wetlands/watercourses involved:
a. General site conditions, including vegetation and general soil conditions.
b. Size of wetland within site or distance of the activity from the wetland.
c. Size of total contiguous wetland.
d. Position relative to other wetlands on site.
e. Type of wetland characterized by vegetative and soil type and/or watercourse, such
as: 1) open/deep fresh water pond or lake; 2) shallow marsh; 3) seasonally flooded
basins and flats; 4) meadow; 5) shrub swamp; 6) wooded swamp; 7) bog; 8) kettle;
9) stream type; 10) other.

Page 5 · open in PDF

3 of 4 
3. Depth to water table, depth to mottled soil, and seasonal variation of water table.
4. Describe the immediate impact on the wetlands and watercourses, including, but not
limited to:
a. Quantities, by volume and area disturbed, of materials to be removed, deposited, or
altered.
b. Kinds of materials by soil types and vegetative classifications, and materials
classification to be removed, deposited, or altered.
c. Percent of wetlands/watercourses disturbed or altered to total area of
wetlands/watercourses on the parcel.
5. Describe the related construction activities and their impact on:
a. Area and location of wetlands and watercourses.
b. Types and amounts of vegetation.
c. Surface and groundwater.
d. Visual impacts.
e. Wildlife habitats.
6. Describe the long term or permanent impact of the activity(ies) on environmental aspects,
such as the surface and groundwater quality, storm water runoff, visual impact(s), or
wildlife habitats on:
a. Wetlands and/or watercourses.
b. Abutting riparian properties and/or wetlands and/or watercourses.
7. Identify sedimentation and erosion control measures to be used.
8. Identify alternatives to the proposed activity that were considered, including alternative
sites and why this one was chosen.
9. Estimate cost of work and time for completion.
10. Attach drainage calculations and other reports as indicated to substantiate the statements
made above.
11. REQUIRED MAPS
a. Attach a vicinity map on an 8 ½”x11” sheet at scale 1”=200’ or 1’=800’ (depending
upon the size of the parcel) showing the general location of the area in which the
regulated activity is proposed. The map should be in sufficient detail to allow the
identification of the property on the official Inland Wetlands and Watercourses
map. A guide to the kinds of information to be shown is available in the Planning
Department at the Town Hall.

Page 6 · open in PDF

4 of 4 
b. Site Plan(s) showing:
i. The topography showing contours at intervals of not more than two (2) feet
and a minimum of two (2) contour marks per ten (10) acres at a scale of
1”=100’ or 1”=40’ (whichever is more appropriate).
ii. Location of existing watercourses and/or ponds.
iii. Location of regulated activity.
iv. Proposed grading and/or filling.
v. Proposed drainage, site utilities, wells, etc.
vi. Sedimentation and erosion control measures.
12. The Applicant shall certify whether:
a. Any portion of the property on which the regulated activity is proposed is located
within 500 feet of the boundary of an adjoining municipality.
b. Traffic attributable to the completed project on the site will use streets within the
adjoining municipality to enter or exit the site.
c. Sewer or water drainage from the project site will flow through and affect the
sewage or drainage system within the adjoining municipality or
d. Water runoff from the improved site will affect streets or other municipal or private
property within the adjoining municipality.
e. Documentation that notice of the pending application was provided to the adjacent
municipality (certified mail, return receipt requested) on the same day of filing an
inland wetland permit application with the Town of Simsbury.
f. The property is subject to a conservation restriction or preservation restriction,
and, if so, what party or parties are holders thereof or intended to be benefitted
thereby.
ALL INFORMATION MUST BE COMPLETED TO THE EXTENT INDICATED BY THE 
COMMISSION BEFORE ANY ACTION IS TAKEN ON THE PERMIT APPLICATION. 
INCOMPLETE APPLICATIONS WILL BE DENIED. ADDITIONAL INFORMATION MAY 
BE REQUIRED BY THE COMMISSION. 
THE APPLICANT AND/OR AUTHORIZED AGENT SHOULD ATTEND THE 
CONSERVATION COMMISSION/INLAND WETLANDS & WATERCOURSES AGENCY 
MEETING IN ORDER FOR A DECISION TO BE RENDERED. IF APPLICANT OR AGENT 
DOES NOT ATTEND, AND QUESTIONS ARISE, DECISION ON APPLICATION MAY BE 
DEFERRED OR DENIED. 

Page 7 · open in PDF

J K Dempsey Engineering PLLC 
308 New London Turnpike 
Stonington, CT 06378 
 
 
 
 
 
 
 
 
 
Michael Nascimento Residence 
 
20 Neal Drive, Simsbury, CT 
 
Community Planning and Development 
Inland Wetlands Permit Application 
New Permit 
 
 
JKDE Project No.: 012325 
 
 
 
 
Prepared by James K Dempsey, PE 
 
 
 
 
 
 
September 29, 2026 

Page 8 · open in PDF

J K Dempsey Engineering, PLLC 
 
20 Neal Drive, Simsbury, CT 
Inland Wetlands Permit R1  JKDE No.: 012325 
Page 2 
 
 
Description: 
 On May 8, 2025 the owner of the property at 20 Neal Drive received a permit, CC#25-13, 
for regulated activities within the 100’ upland review area and minor activities within the 
wetland located at the rear of the property. The project included the regrading, installation of fill, 
removal of vegetation, installation of stone revetment, installation of paving stones, and the 
installation of ADA compliant paths for access to the constructed patio area at the rear of the 
house as depicted below. 
 
Regulated Activities: 
 Regulated activities at the site will include: 
 Installation of erosion and sediment controls 
 The cutting of vegetation along the wetlands to allow the formation of the 
revetment toe 
 Installation of riprap revetment, filter stone, and geotextile fabric 
 Installation of drainage pipe, infiltration units, and infiltration trench 
 Installation of approximately 700 cubic yards of clean, free draining fill 
 Installation of hardscape patio surface level with the door entry at the rear of the 
house 
 Installation of plantings and fence at the top of the revetment 
 Installation of ADA surfaces to allow access from the front of the house to the 
rear 
 Installation of retaining walls 
 Installation of outbuilding – chicken coop 
 
Construction began in the fall of 2025 with the installation of sediment controls, removal 
of trees, removal of existing paving stones, removal of vegetation in the wetland disturbance area 
as depicted in the permit application, and rough grading. The project was forced to stop work 
because of the winter weather. In the spring, the contractor who began the construction did not 
return to continue the work and the owner was forced to hire another contractor to continue the 
project.  
The owner determined the project, as permitted, was not fulfilling his needs.  Deviations 
from the permit were then undertaken to extend the fill areas to the north and south applying the 
same design concepts and creating areas of less slope that the owner can traverse in his wheel 
chair. A retaining wall was installed with steps to traverse between the two filled areas creating 
an upper and lower lawn area at the rear and south side of the house. The paved patio depicted in 
the original permit was moved to the north at a higher elevation which will provide easier access 
for the owner.  The area of the original patio will now be lawn except for a small paver block 
entry patio to the lower sliding door. 
As construction continued, other improvements were made including the installation of a 
double retaining wall at the north side of the property required to retain soil previously retained 
by a dilapidated block wall and vegetation. The fill and revetment on the south side of the 
property extended to the property line and returned to create a level lawn on the south side of the 
house. A retaining wall was installed mid-slope at the south of the house adjacent to the existing 

Page 9 · open in PDF

J K Dempsey Engineering, PLLC 
 
20 Neal Drive, Simsbury, CT 
Inland Wetlands Permit R1  JKDE No.: 012325 
Page 3 
 
retaining wall to terrace the land and reduce runoff.  At the request of the south property owner, 
an infiltration trench was installed at the south side of the property to collect runoff water before 
it could enter the property to the south. A chicken coop structure is under construction on the 
south side of the property. 
Near the end of July, 2026, Brittany MacGilpin – Assistant Town Planner / Wetlands 
Designated Agent, visited the property.  The owner was informed that the construction appeared 
to violate the current wetland permit application.  The Town asked the owner to retain an 
engineer to produce plans and documents that would depict the scope of the original permit and 
the scope of the existing construction.  Some construction continued until the end of August. A 
Stop Work Order was issued by the Town on September 1, 2026. 
In this new application the owner requests approval of the extended proposed 
improvements within the wetlands upland review area.  Since the last meeting, additional silt 
fence has been installed at the top of the revetment slope to retain sediment from moving onto 
the slope and into the wetland. Approvals for the proposed structures including the walls, patio, 
and outbuilding have been obtained from the building department awaiting approval of those 
improvements within the wetlands upland review area. 
 
Section 1: Abutters 
 In the event of a public hearing or map amendment, the following is a list of abutting 
property owners and property owners within 100 feet of the subject property’s lines. 
 
Town of Simsbury    Kimberly A Steele  Leroy T. Lawson 
Simsbury, CT 06070   22 Neal Drive   18 Neal Drive 
     Simsbury, CT 06070  Simsbury, CT 06070 
 
Gregory Wooley &   Eric L. &   William Brian & 
Kathryn Ritz    Kristen Ferguson  Pavla K. Fischer 
17 Neal Drive    19 Neal Drive   28 Drumlin Road 
Simsbury, CT 06070   Simsbury, CT 06070  West Simsbury, CT 06092 
 
Robert N. &    Francis Peter & 
Lori F. Blomberg   Margaret Sexton 
21 Neal Drive    26 Drumlin Road 
Simsbury, CT 06070   West Simsbury, CT 06092 
  
Section 2:  Regulated Area / Wetland or Watercourse 
a.  Reed marsh associated with the north tributary to Nod Brook.  The site consists of 
wetland soils and hosts facultative (FAC) and facultative wetland (FACW) species of 
shrubs, plants, and trees along the edges with dense Phragmites making up the 
majority of the vegetation in the marsh.   
b.  Approximately 0.15 acres of the site contains wetlands  
c.  The total size of the contiguous wetland is approximately 60 acres with approximately 
200’ aligned with this project site.  
d.  The begins at the bottom of the slope in the rear of the house.   
e.  Wetland described as Shallow marsh  

Page 10 · open in PDF

J K Dempsey Engineering, PLLC 
 
20 Neal Drive, Simsbury, CT 
Inland Wetlands Permit R1  JKDE No.: 012325 
Page 4 
 
 
Section 3: Water Table 
 The water table is approximately 6” below the surface at the bottom of the slope where 
the revetment would be installed.  The elevation is estimated to be 265.5’.  The seasonal water 
table change is estimated to be 6”. 
 
Section 4:   Impact to Wetlands  
a.  Deposition of approximately 300 CY of fill over 1600 SF 837 CY over 3500 SF  
b.  There will be no fill removed from the site.  Fill quantities are as follows: 
i.  Riprap 90 cy  135 ton   
ii.  ¾” Stone 50cy  75 ton   
iii.  Fill  697 cy  1046 ton  
iv.  Geotextile Fabric  350 sy   
c.  Approximately 250 sf or wetland will be permanently altered.  The wetland area on 
the parcel is about 7,840 sf. The disturbance percentage altered permanently is 3.2%. 
 
Section 5: Construction Activities  
a.  The construction activities for the revetment and majority of fill will take place 
immediately upland of the wetland border.  The activity nearest the wetland will take 
place along a 200’ long area. 
b.  3-4 midsize bushes and six trees  and several shrubs will be removed to install the 
revetment adjacent to the wetland.  One larger tree, further from the wetland may 
need to be removed. Phragmites in the disturbed wetland area, 200 sf will need to be 
removed for silt fence installation. Several trees and shrubs will be removed from the 
north side yard. 
c.  Surface and groundwater will be directed to the sides of the construction area while 
the construction activities are taking place.  Groundwater is not expected to be an 
issue and there is no plans for dewatering or redirecting groundwater. At the request 
of the south neighbor, Kimberly Steele, an infiltration trench will be installed at the 
bottom of the slope of the south side yard to catch any runoff coming toward her 
property and infiltrate it into the soil.  The trench is three feet wide by three feet deep 
by sixty feet long running east to west. 
d.  Visual impacts have been minimal for the work in the review area however, the 
construction of the improvements on the upside of the house has had greater visual 
impact from the street. 
e.  Wildlife habitat has been minimally impacted during construction. 
 
Section 6: Permanent Impact of Proposed Activities  
a.  The permanent impact of the proposed activities will be minimal over the existing 
conditions.  The project will reduce the grade of a large area of rear yard and side 
yards at the residence allowing for longer “time of concentrations” for the runoff. It 
will also reduce velocity of the runoff.  It will address soil erosion issues caused by 
the steeper grade and sparce vegetation that had been taking place.  The installation 
of the roof drain pipes and infiltrators will allow for infiltration and slower, more 
directed movements of the roof runoff.  The addition of native plantings along the 

Page 11 · open in PDF

J K Dempsey Engineering, PLLC 
 
20 Neal Drive, Simsbury, CT 
Inland Wetlands Permit R1  JKDE No.: 012325 
Page 5 
 
top of the stone revetment will work to trap sediment that may be transported in rills 
toward the wetland.  The project will improve the overall visual aspect of the 
property and allow the owner to enjoy his outdoor environment.  The existing and 
proposed improvements are not expected to have al permanent impact on the 
wetlands once construction is completed and vegetation is established.    
b.  The abutting riparian properties and/or wetlands and/or watercourse is expected to 
have a positive benefit from this project.  The property currently has erosion issues 
with little or no retention of roof drain water.  This project is expected to improve 
water quality in the marsh and book by reducing sediment from the property.  It will 
also reduce velocities of runoff and allow longer times of concentration. 
Section 7: Sediment and Erosion Controls 
 The contractor has been required to install a row of silt fence on the lower extents of the 
construction activity site and shall maintain the silt fence for the duration of the project. In 
addition, a row of silt fence has been installed at the top of the revetment slope and will remain 
during construction and until vegetation is established.  The silt fence shall be inspected after 
each rain event and at least weekly. 
 
Section 8: Alternatives 
 The alternative to the proposed activities considered for this project included a raised 
deck.  This option is less attractive as it does not address the erosion issue taking place at the 
property.  The drainage system could be installed but without changing the slope and installing 
less erodible surface treatments it will continue to degrade.  The construction impact would be 
similar during construction of a raised deck as with the proposed construction. The proposed 
option is also thought to be less expensive to maintain. 
 
Section 9: Cost Estimation and Time to Construct   
 The estimated cost of construction of this project is $120,000.00.  The duration of the 
construction activities is expected to be twelve months.  
 
Section 10: Calculations and Reports 
 No drainage calculations or other reports have been prepared at this time for this project. 
 
Section 11: Maps, Site Plan, Proposed and Existing Drawings, and Photos 
 See attached. 
 
Section 12: Applicant Certifications 
a.  Any portion of the property on which the regulated activity is proposed is located 
within 500 feet of the boundary of an adjoining municipality. 
It does not – N/A 
b.  Traffic attributable to the completed project on the site will use streets within the 
adjoining municipality to enter or exit the site. 
Yes, for deliveries and mobilization / demobilization 
c.  Sewer or water drainage from the project site will flow through and affect the sewage 
or drainage system within the adjoining municipality. 
No 

Page 12 · open in PDF

J K Dempsey Engineering, PLLC 
 
20 Neal Drive, Simsbury, CT 
Inland Wetlands Permit R1  JKDE No.: 012325 
Page 6 
 
d.  Water runoff from the improved site will affect streets or other municipal or private 
property within the adjoining municipality. 
No 
e.  Documentation that notice of the pending application was provided to adjacent 
municipality (certified mail, return receipt requested) on the same day of filing an 
inland wetland permit application with the Town of Simsbury. 
N/A 
f.  The property is subject to a conservation restriction or preservation restriction, and, if 
so, what party or parties are holders thereof or intended to be benefitted thereby. 
N/A 
 
Photos: 
    
     Pre-Construction Back Yard    Pre-Construction Back Yard 
 
   
   Pre-Construction Backyard   Pre-Construction Backyard 
 

Page 13 · open in PDF

J K Dempsey Engineering, PLLC 
 
20 Neal Drive, Simsbury, CT 
Inland Wetlands Permit R1  JKDE No.: 012325 
Page 7 
 
      
 Pre-Construction North Side Yard   New Entry Patio Backyard 
 
      
 
 Side Yard Retaining Walls  Back Yard – Upper Yard 
 

Page 14 · open in PDF

J K Dempsey Engineering, PLLC 
 
20 Neal Drive, Simsbury, CT 
Inland Wetlands Permit R1  JKDE No.: 012325 
Page 8 
 
   
 
     Backyard Paver Patio Area         Backyard  
 
   
 
   South Side Yard Revetment       Backyard Revetment 
 

Page 15 · open in PDF

J K Dempsey Engineering, PLLC 
 
20 Neal Drive, Simsbury, CT 
Inland Wetlands Permit R1  JKDE No.: 012325 
Page 9 
 
    
   Backyard Retaining Wall     South Side Yard Retaining Wall 
    
 
     South Side Yard Infiltration Trench   

Page 16 · open in PDF

J K Dempsey Engineering, PLLC 
 
20 Neal Drive, Simsbury, CT 
Inland Wetlands Permit R1  JKDE No.: 012325 
Page 10 
 
    
 
 Walls at Front of House    Walls at Front of House 
 
             
 
     Vision – Back Yard at Paver Patio   Vision – Top of Revetment 
 

Page 17 · open in PDF

J K Dempsey Engineering, PLLC 
 
20 Neal Drive, Simsbury, CT 
Inland Wetlands Permit R1  JKDE No.: 012325 
Page 11 
 
    
 
       Vision – Driveway from Neal Drive   Vision – Front from Neil Drive 
 
        
 
  Vision – From End of Neil Drive            Vision – Upper Yard and Patio 

Page 18 · open in PDF

PROPERTY OFSTEELE, KIMBERLY A.22 NEAL DRIVE
PROPERTY OFLAWSON, LEROY T18 NEAL DRIVE
266.00
267.00
268.00
269.00
270.00
275.00
276.00
277.00
278.00
278.00
280.00
281.00
282.00
283.00
284.00 288.00
290.00
285.00
287.00
289.00
290.00
293.00
294.00
290.00
284.00
273.00
275.00
270.00
272.00
270.00
266.00
275.00
280.00
284.00
285.00
287.00
288.00
272.00
273.00
284.00284.00
-61.1%
-68.8%
-72.3%
-82.0%
-67.7%
96.2
Date NoRevision
308 New London Turnpike, Stonington, CT 06378  (860) 405-7020
Michael Nascimento Residence
20 Neal Drive
Existing Conditions 08/01/26 & Proposed Improvements
GP1
J.K. Dempsey Engineering PLLC
Date:August 30, 20261"=10' Scale: Project #: JKDE #: 080126 
parcel information
location20 neil drive
useresidential
id30762000
map block lotB18 501 009
acres0.5100
zoningR40OS
volume/page7
ZONE: R-40osrequired
MINIMUM LOT AREA
existing
30,000 SF
MINIMUM LOT WIDTH150'150'
30555 SF
MINIMUM FRONT YARD50'
MINIMUM SIDE YARD
MINIMUM REAR YARD
25'
-
MAXIMUM HEIGHT35'35'
52.6'
44.5' & 26'
8.2%
50'79'
BUILDING COVERAGE
MAXIMUM (IMPERVIOUS
SURFACE) COVERAGE-13.8%
proposed
150'
30555 SF
35'
52.6'
44.5 & 26'
9.1%
79'
24.8%
Feet
01020
17.6
existing main house proposed
paver entry
 6' high
retaining
wall and
steps
stone revetment
retaining walls
alta block by nicolock
4' high max typical
retaining walls
alta block by nicolock
3'-6' high max
grass 
typical
existing retaining wall
mailbox
approximate property line
approximate property line
approximate
 property line
grass 
typical
NOTES
1.property survey taken from subdivision
plan: "final subdivision plan rosewood
estates property of a.a.sasportas
builders, inc. bushy hill road, simsbury
connecticut scale 1"=100' july 19, 1971
office of sanderson & washburn, simsbury
connecticut r-40 open space zone"
2.existing topographic data taken from 2023
state lidar survey
3.new topographic data recorded by JKDE
8/1/26
4.all coordinates refer to connecticut
state plane nad 83 us survey foot.  all
elevations refer to navd 88 in us survey
foot.
5.wetland line taken from the town of
simsbury, connecticut "town acad wetland
map 2014"
6.existing fill is bare earth with no
veggitation
7.original design revetment slope 1v:1.5h
typical = 66.6%
8.revetment construction is earth separated
with geotextile and stone cover - varies
from original design
wetlands
typical
wetland boundry
town map
wetland boundry
town map
road frontage
line from
subdivision drawing
4' high fence
proposed typical
78.9
26.0
44.5
catch basin
stone surface
proposed to be
asphalt
existing asphalt surface existing subsurface
septic system
extent of disturbance
from wetland permit
extend of disturbance
from wetland permit
top of slope
bottom of slope
bottom of slope
bottom of slope
top of slope
top of slope
apparent fill
area over property line
lower lawn
upper lawn
paver area
mid-wall
upper wall
driveway area
cut-fill report
locationarea (sf)cut (cy)fill (cy)net (cy)
lower lawn615059326267 fill
upper lawn30870646646 fill
paver area21794414197 fill
upper wall500055 fill
lower wall47225223 cut
drive area42831563153 cut
total166712841123839 fill
the original wetlands permit was
based on the following fill schedule.
riprap45cy
3
4" stone25cy
fill230cy
total300cy over 1600 sf
nds infiltration unit
outlet to revetment
nds infiltration unit
overflow to revetment
100' wetlands
review line
100' wetlands
review line
3" asphalt curb
existing well
infiltration trench
added since site vist
approximate location
retaining wall
added since
site visit
approximate
location 4'-5' height
extent of disturbance
from wetland permit
merestone
merestone
nds infiltration unit
outlet to revetment
existing soil
1:3 max stone drain
nicolock alta
wall system
2.0
2.0
3.0
retainiing wall notes
1.nicolock alta wall system -
pre-engineered retaining wall
2.blocks are 6"hx16"lx12"d
3.walls up to 3' exposed height require
no soil reinforcement
4.approximate weight of wall unit is 49
pounds
5.wall base shall be a minimum of 1'
below existing grade. stone base
shall be a minimum of 6".
6.geogrid reinforcement shall be
miragrid 3xt tencate or equivilent
7.geotextile shall be nonwoven skaps
GT-160 or equal
8.for parallel walls within 12'
horizontally of each other geogrid
shall extend from face to face
TYPICAL WALL SECTION 3' max
NOT TO SCALE
108/30/26add work done after site visit 8/1/26
existing
sanitary
drywells
typical
6.0
geogrid
1"
12"
geogrid
geogrid
perforated wall drain
may be at ground elev.
perforated wall drain
may be at ground elev.
existing soil
1:3 max stone drain
6.0 Max
2.0
2.0
TYPICAL WALL SECTION 6' max
NOT TO SCALE
geotextile wrapped
stone drain and base
geotextile wrapped
stone drain and base
2.5
screened run
frame only
chicken coop
structure
198 sf
garage
existing main house
21.3
5.5 60.0
3.0
25.0
12.0
209/11/26add work done after 8/30/26 and add information requested by town
INFILTRATION TRENCH - TYPICAL
3.0
3.0
4"Ø perforated
pipe
non-woven geotextile
wrapped 3 8"-3 4" stone
undisturbed earth
geotextile wrapped
stone drain and base geotextile wrapped
stone drain and base
electrical
service
52.6
proposed pillars
with lights
typical
proposed tree
proposed shrub
typical
stone surface
over utility
proposed outdoor
kitchen / grill /
fireplace tbd
11.0
16.0
11.0
309/16/26add work outdoor kitchen location and notes
409/29/26adjust chicken coop dimensions, add silt fence at top of site, add plantings and list of plants
PLANTINGS
1.the wetland review zone will be planted with a mixture of facultative wetland species (facw) and
facultative species (fac) vegetation with the wetland species (facw) being closest to the wetlands in
wet areas and the transition species (fac) being further from the wetland and drier areas.
2.the site shall be seeded with northeast native grass seed mix by New England Wetland Plants Inc.
for permanent seeing at 1 #/1000 sf
3.if short term seeding is required use Fast Lawn by Ground Works at 1 #/ 700 sf
4.additional grasses, ferns, herbaceous plants, shrubs, and trees shall be native species
5.(fac) trees include: balsam fir, red maple, yellow birch, american hornbeam, gray birch, black gum,
cottonwood, and american elm.  (facw) trees include silver maple, river birch, green ash, eastern
larch / tamarack, and pin oak.  NO TREES SHALL BE PLANTED WITHIN 30' OF THE HOUSE.
6.(fac) shrubs include shadow berry / service berry, gray dogwood, common juniper, sheep laural, black
chokeberry, pin azelea, and nanny berry. (facw) shrubs include silky dogwood, maleberry, red
chokeberry, beb's willow, pussy willow, steeplebush, highbush berry, withe-rod / wild rasin, american
cranberrry bush
7.(fac) herbaceous plants include big bluestem, flat-top goldenrod, foxglove beardtongue, golden
alexander. (facw) herbaceous plants include painted broom sedge, tufted hairgrass, hollow stem
joe-pye weed, trumpet weed, bottle gentian, spotted joe-pye weed, sneezeweek / helen's flower,
cut-leafed green headed coreflower, fowl bluegrass
8.(facw) ferns include cinnamon fern, sensitive fern, ostrich fern
9.owner is responsible for coordinating the plantings to achieve the desired buffer and lanscape
native plantings
typical
native plantings
typical
native plantings
typical
silt fence
remove after
vegetation is
established
silt fence
remove after
vegetation is
established
silt fence
remove after
vegetation is
established

Page 19 · open in PDF

Page 20 · open in PDF

Page 21 · open in PDF

  