Public Building and Capital Project Committee, Nov 12, 2026

Granby minutes posted

Documents

TypeDocumentPagesOpen
minutes Public Building & Capital Project Committee Regular Meeting Minutes 2 PDF download · town site
agenda Public Building & Capital Project Committee Regular Meeting 1 PDF download · town site
packet Public Building & Capital Project Committee Regular Meeting (packet)
Sanitized copy: scripts and attachments were removed and the result checked. The original is kept offline.
33 PDF download · town site

Summary of the minutes

AI-generated summary. Each line links to the PDF page it came from; check it before relying on it.

Read the official minutes (PDF, 2 pages) The PDF is the record; this summary is a guide to it.

The committee approved the October 14, 2026 minutes, then voted 7-1-1 to select BSC as the recommended engineering firm for the athletic field project. It also voted 9-0-0 to recommend H2M as the engineering firm for the middle school MEP work, with both recommendations going to the board of selectmen and town manager.

Decisions (3) · all reported votes

  1. Approval of PBCPC Regular Meeting Minutes from October 14, 2026
    Motion by A. Adamson, seconded by M. Gottlieb, to approve the minutes of October 14, 2026, as presented; committee voted to approve.
    Vote: 9-0-0 · p. 1
  2. Proposal Recommendation - Engineering Firm for Athletic Field Project
    Motion by M. Gottlieb, seconded by W. Pascucci, to select BSC for recommendation to the board of selectmen and town manager; committee voted to select BSC. The December 8, 2026 bonding referenda were discussed as they relate to this project.
    Vote: 7-1-1 · p. 1
  3. Proposal Recommendation - Engineering Firm for MEP for Middle School Project
    Motion by Anne Adamson, seconded by D. Peling, to recommend H2M to the board of selectmen and town manager; committee voted to recommend H2M.
    Vote: 9-0-0 · p. 1, p. 2
Summary of the agenda: Public Building & Capital Project Committee Regular Meeting

AI-generated summary.

The Granby Public Building & Capital Project Committee's November 12, 2026 agenda includes approval of the October 14, 2026 minutes and two old-business engineering firm proposal recommendations, one for the athletic field project and one for MEP work on the middle school project.

On the agenda (3)

  1. Approval of PBCPC Regular Meeting Minutes - October 14, 2026 · p. 1
  2. Proposal Recommendation - Engineering Firm For Athletic Field Project (Old Business) · p. 1
  3. Proposal Recommendation - Engineering Firm For MEP For Middle School Project (Old Business) · p. 1

Full text of the documents

View the minutes PDF on this page (Public Building & Capital Project Committee Regular Meeting Minutes) Open the PDF
Text of the minutes (Public Building & Capital Project Committee Regular Meeting Minutes, 2 pages)

Page 1 · open in PDF

 
 
TOWN
 
OF
 
GRANBY
 
 
PUBLIC
 
BUILDING
 
&
 
CAPITAL
 
PROJECT
 
COMMITTEE
 
 
REGULAR
 
MEETING
 
MINUTES
 
 
NOVEMBER
 
12,
 
2026
 
 
PRESENT:
 
Chairman
 
Mark
 
Neumann,
 
Anne
 
Adamson,
 
Peter
 
Anderson,
 
Mark
 
Gottlieb,
 
Christopher
 
Lavigne,
 
Michael
 
Lengvarsky,
 
Kent
 
McCord,
 
William
 
Pascucci,
 
and
 
David
 
Peling
 
 
ALSO
 
PRESENT:
 
Cheri
 
Burke,
 
Superintendent
 
of
 
Schools,
 
Chris
 
DeGray,
 
Director
 
of
 
Facilities
 
ABSENT:
 
NONE
 
 
1.
 
PLEDGE
 
OF
 
ALLEGIANCE
 
 
2.
 
MINUTES
 
 
 
2.I.
 
Approval
 
of
 
PBCPC
 
Regular
 
Meeting
 
Minutes
 
from
 
October
 
14,
 
2026
 
 
           
ON
 
A
 
MOTION
 
by
 
A.
 
Adamson,
 
seconded
 
by
 
M.
 
Gottlieb,
 
the
 
committee
 
voted
    
 
           
(9-0-0)
 
to
 
approve
 
the
 
minutes
 
of
 
October
 
14,
 
2026,
 
as
 
presented.
 
 
3.
 
NEW
 
BUSINESS
 
 
 
3.1
 
None
 
4.
 
OLD
 
BUSINESS
 
     
4.I
 
Proposal
 
Recommendation-
 
Engineering
 
Firm
 
for
 
Athletic
 
Field
 
Project
 
          
M.
 
Neumann
 
opened
 
the
 
discussion
 
regarding
 
responsive
 
documents
 
provided
 
by
 
the
   
 
          
three
 
competing
 
firms,
 
Benesch,
 
SLR,
 
and
 
BSC.
 
A
 
discussion
 
regarding
 
the
 
merits
 
of
           
 
          
various
 
techniques,
 
timelines,
 
and
 
costs
 
proposed
 
by
 
each
 
firm
 
ensued.
 
Chris
 
DeGray,
 
 
          
Director
 
of
 
Facilities
 
for
 
Granby
 
School
 
District,
 
and
 
Cheri
 
Burke,
 
Superintendent
 
of
 
 
          
Schools,
 
each
 
spoke
 
regarding
 
the
 
timelines
 
proposed
 
by
 
each
 
firm
 
and
 
how
 
they
 
might
 
 
          
impact
 
athletic
 
events
 
and
 
seasons.
 
ON
 
A
 
MOTION
 
by
 
M.
 
Gottlieb,
 
seconded
 
by
 
W.
 
 
          
Pascucci,
 
the
 
committee
 
voted
 
(7-1-1)
 
to
 
select
 
BSC
 
for
 
recommendation
 
to
 
the
 
board
 
of
 
 
          
selectmen
 
and
 
town
 
manager.
 
The
 
December
 
8,
 
2026
 
bonding
 
referenda
 
were
 
discussed
 
 
          
as
 
relates
 
to
 
this
 
project.
 
 
    
4.II
 
Proposal
 
Recommendation-
 
Engineering
 
Firm
 
for
 
MEP
 
for
 
Middle
 
School
 
Project
 
          
M.
 
Neumann
 
opened
 
the
 
discussion
 
as
 
to
 
the
 
timeframes
 
and
 
thoroughness
 
of
 
each
    
 
          
proposal.
 
Discussion
 
ensued.
 
Chris
 
DeGray
 
spoke
 
regarding
 
state
 
mandated
 
testing
 
for
      
 
          
air
 
quality
 
and
 
the
 
results
 
of
 
recent
 
testing
 
and
 
balancing
 
reports.
 
He
 
indicated
 
that
 
inflow
 
 
          
is
 
lacking
 
in
 
approximately
 
70%
 
of
 
spaces.
 
ON
 
A
 
MOTION
 
by
 
Anne
 
Adamson,
 
seconded
 
 

Page 2 · open in PDF

          by D. Peling, the committee voted (9-0-0) to recommend H2M to the board of selectmen  
          and town manager.  
5. DISCUSSION OF ACTION ITEMS FOR THE NEXT MEETING  
     No items were proposed, with potential items for the next meeting being dependent on the  
     upcoming referenda votes, which were then discussed, along with various questions from  
     members of the public regarding the sewer proposal.  
6. PUBLIC COMMENT  
None 
 
7. ADJOURNMENT:  
ON A MOTION by A. Anderson, seconded by W. Pascucci,, the committee voted (9-0-0) to 
adjourn the meeting at approximately 6:25 p.m.  
The next regular meeting of the Public Building & Capital Project Committee is scheduled for  
Wednesday, December 9, 2026, at 6 p.m. at the Senior Center.  
Respectfully submitted,  
 
 
Stephanie D’Ambrose 
Recording Secretary 
 
 
View the agenda PDF on this page (Public Building & Capital Project Committee Regular Meeting) Open the PDF
Text of the agenda (Public Building & Capital Project Committee Regular Meeting, 1 page)

Page 1 · open in PDF

Town of Granby is inviting you to a scheduled Zoom meeting. 
https://us02web.zoom.us/j/89413997336?pwd=Rqy9TTbn99JqAlE8fnD7dxkDqGxpV5.1
Meeting ID: 894 1399 7336 
 Passcode: 856357 
TOWN OF GRANBY
Public Building & Capital Project Committee
Regular Meeting Agenda
Thursday, November 12, 2026
6:00 p.m. Senior Center Community Room
Pledge Of Allegiance
Minutes
Approval Of PBCPC Regular Meeting Minutes - October 14, 2026
2 PBCPC 10.14.26 MEETING MINUTES W SIGNATURE PAGE.PDF
New Business
None
Old Business
Proposal Recommendation - Engineering Firm For Athletic Field Project
3 2026-10-30 BENESCH RESPONSE TO COMMITTEE QUESTIONS.PDF
4 BSC GROUP-RESPONSE TO REQUEST FOR CLARIFICATION.PDF
5 SLR 2026-11-02-GRANBY-RESPONSES.PDF
Proposal Recommendation - Engineering Firm For MEP For Middle School Project
6 COMMITTEE QA - MIKE.PDF
7 BL COMPANIES EMAIL RESPONSE.PDF
8 H2M LP262054 GRANBY MS HVAC-RESPONSE LETTER-FINAL.PDF
Discussion Of Action Items For The Next Meeting
Adjournment
The next regular meeting of the Public Building & Capital Project Committee is 
scheduled for Wednesday, December 9, 2026, at 6 p.m. at the Senior Center.
1.
2.
2.I.
Documents:
3.
3.I.
4.
4.I.
Documents:
4.II.
Documents:
5.
6.
View the packet PDF on this page (Public Building & Capital Project Committee Regular Meeting (packet)) Open the PDF
Text of the packet (Public Building & Capital Project Committee Regular Meeting (packet), 33 pages)

Page 1 · open in PDF

Town of Granby is inviting you to a scheduled Zoom meeting. 
https://us02web.zoom.us/j/89413997336?pwd=Rqy9TTbn99JqAlE8fnD7dxkDqGxpV5.1
Meeting ID: 894 1399 7336 
 Passcode: 856357 
TOWN OF GRANBY
Public Building & Capital Project Committee
Regular Meeting Agenda
Thursday, November 12, 2026
6:00 p.m. Senior Center Community Room
Pledge Of Allegiance
Minutes
Approval Of PBCPC Regular Meeting Minutes - October 14, 2026
2 PBCPC 10.14.26 MEETING MINUTES W SIGNATURE PAGE.PDF
New Business
None
Old Business
Proposal Recommendation - Engineering Firm For Athletic Field Project
3 2026-10-30 BENESCH RESPONSE TO COMMITTEE QUESTIONS.PDF
4 BSC GROUP-RESPONSE TO REQUEST FOR CLARIFICATION.PDF
5 SLR 2026-11-02-GRANBY-RESPONSES.PDF
Proposal Recommendation - Engineering Firm For MEP For Middle School Project
6 COMMITTEE QA - MIKE.PDF
7 BL COMPANIES EMAIL RESPONSE.PDF
8 H2M LP262054 GRANBY MS HVAC-RESPONSE LETTER-FINAL.PDF
Discussion Of Action Items For The Next Meeting
Adjournment
The next regular meeting of the Public Building & Capital Project Committee is 
scheduled for Wednesday, December 9, 2026, at 6 p.m. at the Senior Center.
1.
2.
2.I.
Documents:
3.
3.I.
4.
4.I.
Documents:
4.II.
Documents:
5.
6.

Page 2 · open in PDF

 
 
TOWN
 
OF
 
GRANBY
 
 
PUBLIC
 
BUILDING
 
&
 
CAPITAL
 
PROJECT
 
COMMITTEE
 
 
REGULAR
 
MEETING
 
MINUTES
 
 
OCTOBER
 
14,
 
2026
 
 
PRESENT:
 
Chairman
 
Mark
 
Neumann,
 
Anne
 
Adamson,
 
Peter
 
Anderson,
 
Mark
 
Gottlieb,
 
Christopher
 
Lavigne,
 
Michael
 
Lengvarsky,
 
Kent
 
McCord,
 
William
 
Pascucci
 
and
 
David
 
Peling
 
 
ALSO
 
PRESENT:
 
Mike
 
Walsh,
 
Town
 
Manager
  
 
ABSENT:
 
Kent
 
McCord
 
 
1.
 
PLEDGE
 
OF
 
ALLEGIANCE
 
 
2.
 
MINUTES
 
 
2.I.
 
Approval
 
of
 
PBCPC
 
Regular
 
Meeting
 
Minutes
 
from
 
September
 
9,
 
2026
 
 
ON
 
A
 
MOTION
 
by
 
W.
 
Pascucci,
 
seconded
 
by
 
M.
 
Lengvarsky,
 
the
 
committee
 
voted
 
(9-0-0)
 
to
 
approve
 
the
 
minutes
 
of
 
September
 
9,
 
2026,
 
as
 
presented.
 
 
3.
 
NEW
 
BUSINESS
 
 
3.I.
 
Proposal
 
Acceptance-
 
Engineering
 
Firm
 
for
 
Athletic
 
Field
 
Project
 
M.
 
Walsh,
 
Town
 
Manager,
 
provided
 
an
 
overview
 
of
 
the
 
RFP
 
process
 
to
 
date
 
for
 
both
 
this
 
project
 
and
 
the
 
next
 
agenda
 
item.
 
M.
 
Walsh
 
suggested
 
that
 
committee
 
members
 
take
 
additional
 
time
 
to
 
review
 
the
 
proposals
 
submitted
 
and
 
send
 
questions,
 
via
 
the
 
committee
 
chair,
 
to
 
the
 
firms,
 
and
 
to
 
delay
 
acceptance
 
of
 
a
 
proposal
 
for
 
each
 
project
 
until
 
the
 
next
 
meeting
 
of
 
this
 
committee
 
on
 
November
 
12,
 
2026.
 
M.
 
Neumann
 
opened
 
these
 
suggestions
 
to
 
the
 
committee
 
for
 
discussion.
 
Discussion
 
on
 
both
 
proposals
 
ensued.
 
 
3.II.
 
Proposal
 
Acceptance-
 
Engineering
 
Firm
 
for
 
MEP
 
for
 
Middle
 
School
 
See
 
above
 
minutes
 
regarding
 
3.1.
 
ON
 
A
 
MOTION
 
by
 
A.
 
Anderson,
 
seconded
 
by
 
M.
 
Gottlieb,
 
the
 
committee
 
voted
 
(9-0-0)
 
to
 
send
 
all
 
committee
 
member
 
questions
 
on
 
the
 
two
 
above
 
proposals
 
to
 
M.
 
Neumann
 
by
 
October
 
21,
 
2026,
 
who
 
would
 
then
 
send
 
them
 
to
 
M.
 
Walsh
 
for
 
distribution
 
to
 
the
 
contractors,
 
and
 
to
 
further
 
discuss
 
the
 
proposals
 
and
 
select
  
an
 
engineering
 
firm
 
at
 
the
 
next
 
regular
 
meeting
 
of
 
this
 
committee
 
on
 
November
 
12,
 
2026.
 
An
 
email
 
sent
  
by
 
one
 
contractor
 
supplementing
 
their
 
original
 
RFP
 
submission
 
was
 
shared
 
with
 
the
 
committee.
 
A.
 
Anderson
 
and
 
M.
 
Gottlieb
 
requested
 
all
 
proposal
 
materials
 
be
 
shared
 
with
 
them
 
in
 
hard
 
copy,
 
and
 
M.
 
Walsh
 
indicated
 
that
 
would
 
be
 
done.
 
 
4.
 
DISCUSSION
 
OF
 
ACTION
 
ITEMS
 
FOR
 
THE
 
NEXT
 
MEETING
 
 
The
 
Town
 
Manager
 
and
 
Chairman
 
will
 
create
 
the
 
agenda
 
for
 
the
 
November
 
meeting,
 
which
 
will
 
include
 
discussion
 
of
 
the
 
proposals
 
and
 
any
 
questions
 
sent
 
to
 
the
 
contractors,
 
as
 
well
 
as
 

Page 3 · open in PDF

any responsive information received.  
5. PUBLIC COMMENT  
None 
 
6. ADJOURNMENT:  
ON A MOTION by A. Anderson, seconded by M. Gottlieb, the committee voted (9-0-0) to 
adjourn the meeting at approximately 6:25 p.m.  
The next regular meeting of the Public Building & Capital Project Committee is scheduled for  
Wednesday, November 12, 2026, at 6 p.m. at the Senior Center.  
Respectfully submitted,  
 
 
Stephanie D’Ambrose 
Recording Secretary 
 

Page 4 · open in PDF

200 Glastonbury Blvd., Suite 201 
Glastonbury, CT 06033 
www.benesch.com 
P 860-633-8341 
 
 
 
 
October 30, 2026 
 
 
 
Michael P Walsh 
Granby Town Manager 
15 North Granby Road 
Granby, CT 06035 
 
RE: Response to Committee Questions 
 Granby Athletic Fields  
 
Dear Mike: 
 
Below please find our responses to the questions from the Building Committee, asked by you in your October 22, 
2026 email.  The committee questions are presented in bold  and our responses in italics . 
 
Question 1 - Please provide the duration of time you would expect the project to require in months from date 
that the town signs your contract to the final completion of all work including punch list items. 
 
Benesch Response -  We assume the town desires to have the fields ready for use by the start of school in September 
2028.  This is an aggressive schedule that runs approximately 20 months, assuming contract execution at the 
beginning of January 2027.  Benesch has approximately 20 people in the Glastonbury Site Development Group to 
pull from to expedite the survey and design work, and in addition many other professionals in our other offices, if 
required.  The two (2) largest items that could impact this aggressive schedule are as follows: 
• Land Use Permitting – we are beholden to the town process, public feedback and commission decisions.  
There will likely be residents who express safety concerns about the turf, and we will need a municipal 
wetlands permit and site plan approval, so permitting is a bit of an unknown.  We have assumed 4½ 
months, which based on recent experience is fairly aggressive for a project of this magnitude, but not 
unattainable.  The wetlands commission meets once a month and the planning/zoning commission meets 
twice a month.  Early on we will collaborate with town staff and suggest calling special meetings, as 
necessary for the wetlands commission (so that they meet twice per month) and running the permitting 
concurrently between the two (2) commissions. 
• Construction – we are targeting eight (8) months for construction so it will be critical to include the 
construction timeline requirements into the bid package, so as to solicit responses only from firms large 
enough to construct everything within this deadline. 
 
We have attached a design and construction schedule to this letter, which graphically represents the above written 
description. 
 
 

Page 5 · open in PDF

Michael P Walsh 
Page | 2 
 
Question 2 – Could you estimate the quantity of meetings that you have included and define for us quantity of 
in person vs remote. Do your in-person meetings include some evening meetings? 
 
Benesch Response – We have assumed meetings during design, permitting and construction, as follows: 
• Design Meetings – we assume we will have bi-weekly meetings with the staff and stakeholders throughout 
the design process. We will be flexible and conduct these either during the day or the evening, depending 
on the best availability of the town representatives.  We envision a combination of in-person and remote 
meetings.  We will be flexible to meet the town’s needs with the number and type of meetings. 
• Permit Meetings – our fee covers the full scope of meetings required for land use permitting, including pre-
application meetings with town staff and commission meetings. 
• Construction – based on an eight (8) month construction timeline, we have assumed weekly site visits  (~ 
34) and bi-weekly Owner–Architect–Contractor (OAC)  meetings (~17).  We envision the OAC meetings will 
be held on site, but we could conduct those via Teams, if necessary. 
 
These numbers represent our approximation of the meetings we anticipate.  They are not meant to represent an 
upper limit.  If, during the project, it becomes apparent that we are required to attend a significant number of 
design and construction meetings, beyond our assumptions, we will notify you.  Based on much previous, similar 
work, however, we feel comfortable with our above assumptions. 
 
Question 3 - Does your proposal include assistance with approvals and/or permitting with applicable governing 
bodies such as inland wetlands and waterways and DEEP? 
 
Benesch Response – Yes, our scope and lump sum fee includes the following land use permits: 
• Wetlands – Granby Inland Wetlands & Watercourses Commission 
• Site Plan/Special Permit – Granby Planning & Zoning Commission 
• Construction General Permit Associated with Stormwater – CT DEEP 
 
Following are items that are potentially associated with those permits, which we have excluded: 
• The CT DEEP Construction Stormwater Permit requires a review by DEEP for archeologically sensitive and 
listed species that may be present on the site.  Based on their review, they may require additional studies.  
We have not included these additional studies because we do not know if they will be required and if they 
are, the specific scope of analysis required by DEEP.  The CT DEEP Natural Diversity Database indicates the 
site is not within an area of concern, though one appears to be located to the north of the site.  It would 
be our assumption that these studies would not be required since the only areas being disturbed are 
existing athletic fields. 
• The CT DEEP Construction Stormwater Permit includes design required to obtain the permit, and then 
during construction the permit requires weekly erosion control inspections.  Our scope includes all work 
required to obtain the permit, but not the weekly inspections.  This can be put on the contractor or it can 
be performed by a qualified engineering firm. We are willing to perform these services, based on a 
negotiated fee, or we can assist the town in putting it out to bid, or we can put it on the contractor as part 
of our bid documents. 
 
 

Page 6 · open in PDF

Michael P Walsh 
Page | 3 
 
Question 4 - Could you indicate how long permitting has been taking, in your experience, for this type of work. 
 
Benesch Response – Permitting varies greatly from town to town.  The two (2) local land use permits that are 
necessary will be required from the Inland Wetlands & Watercourses Commission and the Planning & Zoning 
Commission.  These permits are mandated by state statute, but the administration of them varies from town to 
town.  It is therefore difficult to predict an exact timeline since the process is subject to commissions that are 
comprised of volunteers, who have varying levels of technical expertise and understanding of their jurisdiction.  
Based on our recent, similar experience, we have estimated approximately four (4) to five (5) months will be 
required.  However, we have identified strategies, as described in our response to Question 1, that we believe can 
help streamline the process. 
 
The state permit (CT DEEP Construction Stormwater General Permit) requires a review by CT DEEP NDDB and we 
will initiate that immediately.  The General Permit must be submitted 60 days prior to the start of construction.    
We do not submit this until we have heard from the local permitting authorities that they are satisfied with our 
stormwater design.  Since time is of the essence in this project, we anticipate we will submit this during the 
permitting process, after we are satisfied that our design is accepted, or at least mostly accepted, by the 
commissions.   
 
Question 5 - Keeping in mind, we are working within a footprint that would be undergoing renovation, In your 
experience, would you be concerned about encountering rare or endangered species of plants or animals that 
could impact our project? 
 
Benesch Response – As described in our response to Question 3, we do not anticipate listed species or areas of 
archeological concern would be impacted by the construction.  That being said, DEEP may identify nearby areas of 
concern and require further studies.  It has been our experience and belief that DEEP has in the past utilized this 
review to obtain studies that are funded by the applicant.   
 
Question 6 - Assuming approval by the voters early December, then time for final contract acceptance, we could 
probably not begin work until 1/1/27. What work would you expect to be able to accomplish during the winter 
months? 
 
Benesch Response – We will know well in advance of January if we will be selected for this project, should it pass 
referendum.  Therefore, we will have our survey and geotechnical activities scheduled for early January, weather-
permitting.  We will prepare a schedule for the initial stakeholder meeting to obtain the necessary information to 
begin conceptual design during the survey/geotechnical process.  We will prepare GIS-based survey early on in the 
process, which we will utilize to prepare conceptual plans for stakeholder review.  Once our survey is complete, we 
will then utilize that for design past conceptual design.  Also, as previously mentioned, we will initiate the NDDB 
review very early on in the process. 
 
Additionally, we will evaluate, with the town, the option for utilizing the CREC cooperative purchasing for turf, 
which we most recently used on the Southern Connecticut State University project, as a way to possibly streamline 
the construction timeline. 
 
Question 7 - Reimbursables or Direct Costs was not spelled out in all of the proposals. Can you estimate the 
expenditure that would be expected for Granby to include in budgeting? 
 
Benesch Response - The submitted proposal identifies a $4,000 direct-expense allowance, billed at actual cost 
without markup, for items such as plan reproduction, mileage, shipping, abutter mailings and public-hearing signs.  

Page 7 · open in PDF

Michael P Walsh 
Page | 4 
 
Typically, the largest cost in this line item is the cost associated with plan reproduction, as required for land use 
permit applications and that is dependent on the size and number of plan sets the town requires. 
 
Question 8 - Does your proposal include any presentation materials which can either be displayed at the Town 
Hall or digitally? 
 
Benesch Response – Yes, we have included colored site renderings, as required, for presentations at commission 
hearings. Selected exhibits can be supplied as print-ready PDFs and digital images for Town Hall, public meetings 
and the Town’s website.  Our software and rendering capabilities allow us to produce high-quality renderings at 
relatively small efforts, and we are very happy to share these with our clients for use in promoting the project.  Our 
fee includes renderings.  
 
Question 9 - Are there any items that you would consider long lead items that could impact our schedule? 
 
Benesch Response - Potential procurement constraints include synthetic turf/infill systems, stadium LED lighting 
and controls and specialty athletic equipment. We will correspond with vendors to understand specific supplier 
lead times.  We will employ the following strategies to help streamline the purchasing and construction process: 
• Make early material decision. 
• Prepare bid-documents concurrent with permitting. 
• Determine eligible CREC cooperative purchases and independent field packages. If the town is open to 
considering this method of procurement. 
 
If you have any questions about this information, please call or e-mail me at 860-494-4359 or 
wwalter@benesch.com .  
 
Sincerely, 
Alfred Benesch & Company      
 
Will Walter, PE 
Senior Project Manager 

Page 8 · open in PDF

01 Kickoff / Existing Information 04 Jan 27 15 Jan 27 2.0 ◆
02 Survey + Phase 1 Investigation 04 Jan 27 26 Feb 27 8.0 ◆
03 Investigation / Basis of Design 15 Feb 27 12 Mar 27 4.0 ◆
04 30% / Schematic Design 01 Mar 27 02 Apr 27 5.0 ◆
05 Design Development 05 Apr 27 14 May 27 6.0 ◆
06 Land-Use / Regulatory Permitting 01 May 27 15 Sep 27 19.6 ◆
07 Final CDs / Bid Documents 15 Jul 27 15 Sep 27 9.0 ◆
08 Bidding + Award 15 Sep 27 31 Oct 27 6.6 ◆
09 Mobilization / Procurement 01 Nov 27 15 Dec 27 6.6 ◆
10 Major Construction 01 Nov 27 30 Jun 28 35.0 ◆
11 Surfacing + Final Site Work 19 Jun 28 11 Aug 28 8.0 ◆
12 Punch List / Closeout 14 Aug 28 31 Aug 28 2.8 ◆
19.9 months
GRANBY ATHLETIC FIELDS
ALFRED BENESCH & COMPANY PROPOSED DESIGN + CONSTRUCTION SCHEDULE  |  30 OCTOBER 2026
CONSTRUCTION START
Nov 2027
PHYSICAL CLOSEOUT
31 Aug 2028
COLOR KEY  /  ◆ phase finish INVESTIGATION DESIGN PERMITTING PROCUREMENT CONSTRUCTION COMPLETION
NOTICE TO PROCEED
04 Jan 2027
BID-READY TARGET
15 Sep 2027
PLANNING DURATION
NO. PHASE / ACTIVITY START FINISH WKS Aug '27 Sep '27 Oct '27Jan '27 Feb '27 Mar '27 Apr '27 May '27
SEPTEMBER BID READINESS  |  Complete approvals and final documents before bid release; mobilize in November.
PLANNING BASIS  |  NTP 04 Jan 2027. Agency approvals, remediation, procurement and weather govern the final sequence. Phases may overlap by work area.
Apr '28 May '28 Jun '28 Jul '28 Aug '28Nov '27 Dec '27 Jan '28 Feb '28 Mar '28Jun '27 Jul '27
Benesch  |  Granby Athletic Fields Proposed planning schedule 30 October 2026 

Page 9 · open in PDF

  
 
10/30/2026 www.bscgroup.com 
Michael P. Walsh 
Town Manager 
Town of Granby 
15 N. Granby Road 
Granby, CT 06035 
 
RE: Granby Athletic Field Engineering Proposal – Response to Questions and Clarifications 
Dear Mr. Walsh and members of the Public Building and Capital Project Committee, 
 
BSC Group, Inc. (BSC) is pleased to submit our responses to your questions regarding our 
proposal for investigation, engineering, and design services for athletic facility improvements 
at Granby Memorial High School located at 54 N. Granby Road.  
 
Question: Explain what Atterberg Limits Tests are. 
Answer: The Atterberg Limits test is a simple lab procedure that shows how a clay or silt soil 
changes from a hard solid to a moldable plastic to a flowing liquid as its water content 
increases. It identifies the liquid limit (where it begins to flow), the plastic limit (where it can 
just barely be rolled into a thin thread without crumbling), and the shrinkage limit (below 
which drying no longer reduces its volume). The difference between the liquid and plastic 
limits, called the plasticity index, shows how sensitive the soil is to moisture. This matters for 
structural design because soils with a high plasticity index swell when wet and shrink when 
dry, which can crack slabs, lift foundations, and damage pavements. Because the test is 
quick and inexpensive, engineers use it early in a site investigation to classify soils, flag 
expansive or weak materials, estimate likely settlement and strength, and decide whether fill 
is suitable or fixes like deeper foundations, moisture control, or lime stabilization are needed. 
Question: Explain what Rigid Inclusions, Controlled-Modulus Columns, Lightweight Fill and 
Hybrid Systems are. 
Answer: Rigid Inclusions are vertical columns of stiff material, usually concrete, grout, or 
aggregate, installed into soft or weak ground to help it carry loads without settling too much. 
They are often built by drilling or displacing the soil and filling the hole with concrete or 
cement grout, and they are typically not structurally connected to the pavement or structure 
above. Instead, a layer of compacted granular material, called a load transfer platform, sits on 
top of the columns and spreads the load between them and the surrounding soil. 
They are used for pavement support because soft clays, silts, and loose or organic soils can 
compress and settle unevenly under the weight of an embankment, roadway, or heavy traffic, 
leaving bumps, cracks, and costly repairs. Rigid inclusions work by being much stiffer than 
the soil around them, so they attract a large share of the load and pass it down to deeper, 
stronger layers. Through a process called arching, the load transfer platform channels stress 
onto the columns, which reduces the load on the soft soil and limits settlement. Compared 
with options like removing and replacing the soft soil or waiting for it to consolidate under a 
preload, rigid inclusions can be faster to build, can control settlement more reliably, and often 

Page 10 · open in PDF

  
 
cause less disruption, which makes them especially useful for road and rail approaches, 
bridge abutments, and sites with tight schedules or strict settlement limits. 
Controlled modulus columns (CMCs) are a specific type of rigid inclusion: vertical columns of 
cement grout installed into soft or loose ground to make it stiffer and reduce settlement. They 
are built using a special auger that screws into the soil and pushes it aside rather than pulling 
it out. Once the auger reaches the target depth, grout is pumped through its hollow stem as it 
is withdrawn, forming a continuous column. Because the soil is displaced instead of 
excavated, there are almost no spoils to haul away. The name comes from the fact that the 
stiffness (modulus) of the columns can be tuned by adjusting the grout mix, column diameter, 
and spacing, so the improved ground can be designed to behave in a predictable way. 
Lightweight fill is the use of lightweight materials in place of conventional soil to build up an 
embankment or roadway grade. The goal is to reduce the weight placed on soft ground rather 
than strengthen the ground itself. Common lightweight fills include expanded polystyrene 
(EPS) geofoam blocks, foamed or cellular concrete, lightweight aggregates such as 
expanded clay or shale, and shredded tire or wood-based fills. 
Hybrid systems combine light fill with other ground improvement methods, such as using 
geofoam or foamed concrete together with rigid inclusions, controlled modulus columns, or 
stone columns. The idea is to attack the settlement problem from two sides: the lighter fill 
reduces the load that has to be carried, and the columns stiffen the ground and pick up much 
of what remains. Some hybrid designs also pair light fill with geosynthetic reinforcement, 
drainage, or partial excavation of the softest soil. 
Hybrid systems are often chosen when light fill alone is not enough, or when using columns 
alone would require a very dense or costly layout. Combining the two can reduce the number 
of columns needed, control both short-term and long-term settlement, and balance cost, 
schedule, and performance.  
Question: Has BSC used any of the previously listed techniques in past projects? 
Answer: BSC is currently working on the new Norwalk High School as a sub-consultant to 
Kaestle Boos Associates. The geotechnical investigations in the vicinity of the proposed 
synthetic turf field and running track encountered extensive, deep pockets of highly organic 
subsoils. The Geotechnical Report concluded that the proposed track and field would 
experience significant differential settlement without some form of ground improvement. The 
Owner accepted the recommended approach of rammed aggregate piers, a type of rigid 
inclusion. BSC worked closely with the project Geotechnical Engineer and Landscape 
Architect to prepare the contract documents for the track and field supported on the rammed 
aggregate pier reinforced subgrade. The project is currently in construction. Aggregate piers 
have been successfully installed below the new school building; however, the track and field 
has not yet been constructed.   
Question: Please provide the duration of time you would expect the project to require in 
months from date that the town signs your contract to the final completion of all work 
including punch list items. 
Answer: We anticipate that design and permitting will take approximately 9 months, with 
construction taking an additional 12 months, for a total of approximately 21 months. 

Page 11 · open in PDF

  
 
Question: Could you estimate the quantity of meetings that you have included and define for 
us quantity of in person vs remote. Does your in-person meetings include some evening 
meetings? 
Answer: We have included a total of 8 meetings during the design phase. We have assumed 
that the Task 1.5 Phase 1 Recommendations and Decision Workshop will be held in person; 
all others will be remote. Remote meetings make scheduling more convenient while reducing 
project costs. Evening meeting times are not distinguished separately and can be 
accommodated. 
Question: Does your proposal include assistance with approvals and or permitting with 
applicable governing bodies such as inland wetlands and waterways and DEEP? 
Answer: Yes. Task 2.4 Permitting describes the scope of work included, which covers Town 
of Granby Zoning site plan approval, Inland Wetlands approval, and CT DEEP General 
Permit registration.  
Question: Could you indicate how long permitting has been taking, in your experience, for this 
type of work. 
Answer: Typically, Town permitting takes two-three months. For this project, we anticipate 
needing Zoning and Inland Wetlands approval, which can run concurrently.   
Question: Keeping in mind, we are working within a footprint that would be undergoing 
renovation, In your experience, would you be concerned about encountering rare or 
endangered species of plants or animals that could impact our project? 
Answer: Based on a preliminary desktop review of the Connecticut Natural Diversity 
Database (NDDB), the project area is outside mapped NDDB areas. However, there is 
potential to encounter migratory species. As part of registering the project under CT DEEP’s 
General Permit for the Discharge of Stormwater and Dewatering Wastewaters from 
Construction Activities, CT DEEP may perform a review and provide a determination letter. In 
our experience, this review rarely has a significant impact on projects of this type. 
 
Question: Assuming approval by the voters early December, then time for final contract 
acceptance, we could probably not begin work until 1/1/27. What work would you expect to 
be able to accomplish during the winter months? 
 

Page 12 · open in PDF

  
 
Answer: Depending on snow cover, we anticipate that topographic survey and geotechnical 
investigation can be performed. Wetland delineation requires observing soils; therefore snow 
cover or frozen soil may prohibit this work from being performed until conditions allow.  
 
Question: Reimbursables or Direct Costs was not spelled out in all of the proposals. Can you 
estimate the expenditure that would be expected for Granby to include in budgeting? 
 
Answer: Our fee is lump sum, with all expenses included. 
 
Question: Does your proposal include any presentation materials which can either be 
displayed at the Town Hall or digitally? 
 
Answer: Two-dimensional site plan renderings are included in our fee and can be provided in 
digital format for use by the Town.  
 
Question: Are there any items that you would consider long lead items that could impact our 
schedule? 
 
Answer: Currently, geotechnical drillers are booked a month out; however, we anticipate this 
will be reduced during the winter months. Also, as noted above, snow cover and or frozen 
soils may delay topographic survey or wetland delineation. 
 
BSC welcomes the opportunity to provide clarifications to our professional services proposal 
for this project. If you should have any questions or require additional information, please 
contact me at jharris@bscgroup.com or 860-652-8227. 
 
Sincerely, 
 
BSC Group, Inc. 
 
Jesse A. Harris, Project Manager 
 
 
 
 
 
 
 
 
 
 
 

Page 13 · open in PDF

SLR International Corporation 
 
99 Realty Drive, Cheshire, Connecticut, 06410 
 
 1  
 
November 2, 2026 
Attention: Mike Walsh, Town Manager 
Town of Granby  
15 North Granby Road 
Granby, CT  06035 
SLR Project No.: 141.P51644.00001 
Client Reference No.: 12712 
RE: Investigation and Design Services for Athletic Field Improvements 
Stadium Field, Track, Field Two, and Baseball Field at the 
Granby Memorial High School Complex 
Granby, Connecticut 
 
Dear Mr. Walsh, 
 
This letter provides our responses regarding the above-referenced project in two groups: 
questions specific to SLR, followed by questions for all firms. Each group retains its own 
question and response numbering. 
 
C1. Explain how imaging and linear excavation tools work? 
R1.     Imaging and targeted linear excavation provide complementary views of 
subsurface conditions: imaging helps identify areas that warrant closer 
investigation, while strategic trenching allows direct observation of soil and fill 
materials. Unlike isolated bore holes, a trench exposes a continuous cross 
section along its alignment, reducing gaps between observation points. 
Excavated material can be evaluated at the surface, and a camera can be lowered 
into the trench to document exposed soil horizons. Together, these methods help 
focus the investigation on the conditions most likely to affect design, construction 
cost, and field performance. Electrical Resistivity Imaging is described in 
Response R2 below. 
 
C2. Explain what electrical resistivity imaging is. 
R2.      Electrical Resistivity Imaging (ERI) is a non-invasive geophysical survey method 
that measures how strongly subsurface materials resist electrical current. The 
measurements are interpreted to develop cross-sectional images of variations in 
soil, rock, groundwater, and possible buried features. ERI provides a broader 
picture between isolated investigation points, helping identify areas for targeted 
borings or excavation. Its results are interpreted—not direct observations—and 
therefore should be evaluated alongside site history and physical investigation 
findings – as we suggest in conjunction with linear trenching. 

Page 14 · open in PDF

Town of Granby 
Investigation and Design Services for Athletic Field Improvements 
 
November 2, 2026 
SLR Project No.: 141.P51644.00001 
 
 2  
 
For synthetic turf field design, this broader understanding of subsurface 
conditions is particularly important for evaluating existing drainage 
characteristics, identifying areas of inconsistent subgrade conditions, and 
determining the extent of potential excavation, soil replacement, and drainage 
improvements. By identifying subsurface variability early in the design process, 
ERI can help minimize unexpected construction conditions, and reduce 
unnecessary earthwork. The resulting information can also support more 
informed decisions regarding subgrade preparation and the design of the 
aggregate base and subsurface drainage infrastructure. 
When integrated with a targeted program of linear trenching, ERI offers a more 
complete and cost-effective approach to subsurface characterization than reliance 
on conventional borings alone. This combined approach can reduce uncertainty 
during design and construction, improve the basis for construction cost 
estimates, and support the long-term performance, stability, and drainage of the 
synthetic turf field. 
 
C3. Explain drone derived photogrammetry. 
R3.      Drone-derived photogrammetry provides a highly effective, non-invasive method 
for evaluating the condition and performance of an existing synthetic turf athletic 
field. Drone-derived photogrammetry uses overlapping aerial photographs to 
develop maps, topographic information, 3D models, and digital terrain surfaces.  
This process is particularly useful in open spaces with limited obstructions and 
relatively flat topography, such as an athletic field. Drone camera technology 
captures detailed, georeferenced information across the entire playing surface, 
reducing reliance on interpolation between widely spaced survey points. This 
broad surface coverage complements traditional field surveying; the level of detail 
and accuracy depends on the survey approach and site conditions. 
  
C4. How do the previous tools provide more complete information vs. borings? 
R4.     The suggested methods complement the boring information provided to date by 
extending investigation coverage between individual boring locations. Borings 
provide detailed information at specific points, but conditions between those 
points must be inferred. ERI helps identify subsurface variations along survey 
lines, and targeted trenching provides direct observation of soil and fill along 
excavated alignments. Drone-derived photogrammetry documents surface micro-
topography with broad coverage and can offer efficiency and detail advantages 
over traditional field surveying. Together, these methods provide a more 
comprehensive picture while reducing—not eliminating—the need for 
interpretation. 
Our review of historical aerial imagery of the stadium site indicates that fill was 
placed to expand the track and field area, particularly on the east side, where the 
majority of issues have occurred to date. These observations support prioritizing 
due diligence during site investigations before committing to costly soil removals 
or post-tension slab construction. We believe that a more comprehensive 
understanding of subsurface conditions can result in cost savings for the overall 
field rehabilitation project. The proposed approach is intended to reduce gaps 

Page 15 · open in PDF

Town of Granby 
Investigation and Design Services for Athletic Field Improvements 
 
November 2, 2026 
SLR Project No.: 141.P51644.00001 
 
 3  
 
between spot investigations, better define the extent of potentially unsuitable 
material, and support more informed design and excavation decisions. 
 
C5. Can SLR provide other projects that have utilized the previous investigative tools? 
R5.      Our in-house survey department has been at the forefront of drone-derived 
photogrammetry and Lidar for years and has recently added sonar survey 
equipment to our capabilities. We have provided drone photogrammetry on a wide 
variety of projects including riverine restorations, public parks, urban 
streetscapes, and athletic fields. Just this past week SLR completed drone 
photogrammetry and lidar services for Pratt & Whitney Stadium and Rentschler 
Field in East Hartford. 
 We have not used ERI to date. 
In 2023-24, SLR partnered with the Town of Enfield to investigate drainage issues 
at the high school grass fields. Linear excavations helped us better understand 
subsurface conditions, including overly compacted soils. We then converted 
several fields to sand-slit drainage and collection systems, again using a similar 
process of linear excavations. These improvements substantially improved 
surface and subsurface drainage, overall field playability, and recovery. 
  
Responses to questions for all firms: 
 
C1. Please provide the duration of time your would expect the project to require in months 
 from date that the town signs your contract to the final completion of all work including 
 punch list items. 
R1.      Assuming the Town adds bidding and construction-phase services, which were 
not included in our previous scope, we anticipate the schedule below from 
contract execution through final completion, including punch list items. These 
planning durations provide a practical framework for coordinating design 
decisions, approvals, procurement, and construction; they are estimates rather 
than guaranteed completion dates. 
• Investigation, design, and permitting: 4-5 months 
• Bidding and construction contract award: 2 months 
• Construction:  
o Stadium Track & Field and Field 2: approximately 4 months 
o Baseball/softball field: approximately 3 months 
• Punch list completion and closeout: approximately 1 month 
Based on these assumptions, the estimated duration is 11–12 months for the 
Stadium Track & Field and Field 2 improvements and 10–11 months for the 
baseball/softball field improvements. Concurrent bidding and construction may 
provide opportunities to streamline delivery. The final schedule will depend on 
field conditions, permitting, Town decisions, procurement, and contractor 
sequencing. 

Page 16 · open in PDF

Town of Granby 
Investigation and Design Services for Athletic Field Improvements 
 
November 2, 2026 
SLR Project No.: 141.P51644.00001 
 
 4  
 
 
C2. Could you estimate the quantity of meetings that you have included and define for us 
 quantity of in person vs. remote.  Do your in-person meetings include some evening 
 meetings? 
R2.     Our anticipated meeting allowance for the combined project is outlined below. 
Unless otherwise noted, these meetings are assumed to be in person, providing 
direct opportunities to resolve issues, confirm decisions, and maintain alignment 
with the Town throughout delivery. 
• Investigation, design, and permitting: Approximately 8 in-person meetings 
• Bidding and construction contract award: Approximately 2 in-person meetings 
• Construction:  
o Stadium Track & Field and Field 2: approximately 16 in-person meetings 
o Baseball/softball field: approximately 12 in-person meetings* 
• Punch list completion and closeout: Approximately 1 in-person meeting 
*If projects are constructed concurrently, the number of weekly progress 
meetings would be reduced by approximately 12 meetings. 
In addition to the meetings listed above, we anticipate remote coordination 
meetings and conference calls with Town staff, project stakeholders, permitting 
agencies, and the contractor as needed. These remote meetings are not 
specifically limited in number and will be used as appropriate to support timely 
decisions, clear communication, and schedule coordination. 
Most meetings are expected to occur during normal business hours. Attendance 
at evening meetings—including presentations to Town boards, commissions, 
committees, and public forums—is included as required. This allows the project 
team to support public and stakeholder engagement at key decision points. 
 
C3. Does your proposal include assistance with approvals and or permitting with applicable 
 governing bodies such as inland wetlands and waterways and DEEP? 
R3.      Yes. Our proposal includes assistance with applicable local and state approvals 
and regulatory permitting, including preparation of supporting materials and 
coordination with the Inland Wetlands and Watercourses Commission, 
Connecticut DEEP, and other governing agencies as required. This support helps 
align the design with applicable requirements and address agency comments 
during review. Permit application fees, if applicable, are the Town’s responsibility; 
approval decisions remain with the governing agencies. 
 
C4. Could you indicate how long permitting has been taking, in your experience, for this type 
 of work. 
R4.      Based on our experience with similar projects, permitting and regulatory review 
can typically be completed in approximately two months. This is a planning 
allowance, not a guaranteed approval period: timing depends on agency meeting 
schedules, workload, application requirements, and the complexity of the 

Page 17 · open in PDF

Town of Granby 
Investigation and Design Services for Athletic Field Improvements 
 
November 2, 2026 
SLR Project No.: 141.P51644.00001 
 
 5  
 
improvements. Proactive coordination and clear supporting materials can help 
address review questions early and reduce avoidable delays. 
 
C5. Keeping in mind, we are working within a footprint that would be undergoing renovation, 
in your experience, would you be concerned about encountering rare or endangered 
species of plants or animals that could impact our project? 
R5.      Based on our experience with comparable renovations within previously 
developed athletic facility footprints, we have no specific concerns at this stage 
regarding rare or endangered plant or animal species. However, prior 
development alone does not confirm the absence of protected species or 
eliminate environmental review requirements. Any required reviews will be 
conducted as part of permitting to verify site conditions and identify applicable 
constraints before they affect design or construction decisions. 
 
C6. Assuming approval by the voters early December, then time for final contract 
acceptance, we could probably not begin work until 1/1/27. What work would you expect 
to be able to accomplish during the winter months?   
R6.     A January 1, 2027 start can provide a productive winter planning period. Assuming 
minimal or no snow cover and suitable access and ground conditions, we 
anticipate completing the required site investigation and existing conditions 
assessments during the winter months. Weather-sensitive tasks may need to be 
sequenced around field conditions. Regardless of field investigation timing, 
available mapping and existing data can support preliminary design concepts and 
preliminary opinions of probable construction cost, keeping the project moving 
while site findings are developed. 
During this period, we can conduct a stakeholder kickoff meeting and a 
subsequent review of preliminary design concepts and cost estimates. 
Preliminary plans can also support early discussions with Town departments and 
land use staff. This parallel approach brings priorities, budget considerations, and 
regulatory feedback into the design process early, helping reduce avoidable 
revisions later. 
 
C7. Reimbursables or Direct Costs was not spelled out in all of the proposals.  Can you 
 estimate the expenditure that would be expected for Granby to include in budgeting? 
R7.      All reimbursable expenses and direct costs associated with our proposed scope 
are included in the lump-sum fees. We do not anticipate additional reimbursable 
or direct-cost expenditures requiring separate Town budgeting for that scope. 
This provides a clear basis for budgeting our proposed services. As noted in 
Response R3, permit application fees, if applicable, remain the Town’s 
responsibility; any added bidding or construction-phase services would also need 
to be reflected in the agreed scope and fee. 
 
 

Page 18 · open in PDF

Town of Granby 
Investigation and Design Services for Athletic Field Improvements 
 
November 2, 2026 
SLR Project No.: 141.P51644.00001 
 
 6  
 
C8. Does your proposal include any presentation materials which can either be displayed at 
 the Town Hall or digitally? 
R8.      Yes. Our proposal includes a color rendering of the proposed improvements in 
both high-resolution digital and printed formats. These materials will be suitable 
for Town Hall display, public meetings, community outreach, and electronic 
distribution. A clear visual presentation helps residents and stakeholders 
understand the proposed improvements and supports informed discussion at key 
project milestones. 
 
C9. Are there any items that you would consider long lead items that could impact our 
 schedule? 
R9.      At this stage, we do not anticipate significant long-lead items for the Stadium 
Track & Field or Field 2 turf replacement projects. For the baseball/softball field 
improvements, specialty components—including prefabricated dugouts and other 
owner-selected amenities—may require longer procurement periods depending 
on the final design and manufacturer. Identifying these items early, confirming 
supplier lead times, and making timely Town selections will be important to 
protecting the schedule. Advance procurement may be considered where 
appropriate. Supporting site infrastructure can often be constructed before 
component delivery, but the final sequence and schedule effects will depend on 
the selected products and contractor coordination. 
 
Regards, 
SLR International Corporation 
 
 
Kevin Fuselier, PLA, LEED GA 
Senior Principal/Team Leader, Landscape Architect 
kfuselier@slrconsulting.com 
 
 
 

Page 19 · open in PDF

Michael P. Walsh 
Granby Town Manager 
15 N. Granby Road 
Granby, CT 06035 
E-Mail: mwalsh@granbY.-ct.gov
Office Phone: 860-844-5302 
Facsimile: 860-653-4769 
Hello Mark, 
Following are my questions for the engineering firms and a few for Mike. 
Thanks. 
Peter 
For Mike: 
1. Benesch and BCS both mentioned in their Phase 2 section that they would provide bidding assistance and
construction phase services and SLR mentioned they would not provide those services. SLR referred to the towns
request for information limited to development of a bid-ready project. Could this be clarified?
2. For the Middle School HVAC work, does the school system have a EPA Indoor Air Quality program in place?
Yes. All Granby schools comply with the CT Indoor Air Quality Inspection Program yearly as outlined here:
IAQ Reguirements for School Districts
Here is a link to the Granby Schools Facilities page where we are required to publicly publish yearly results:
Tools for Schools I Granby Public Schools
We are currently conducting our 2026 surveys for all schools, due by 12/31/26.
3. For the Middle School HVAC work, how will the town handle balancing and testing of new HVAC equipment as
this has not been included in the proposals from BL and H2M?
CT has in place a mandate that evert K-12 district must provide a comprehensive HVAC system evaluation every 5
years, with a minimum of 20% of schools assessed each year (for Granby this would be 1 school a year). The
Middle School assessment took place April 2026 by Fuss and O'Neill where full testing and balancing took place
(These results are scheduled to be shared publicly in the 11/4/26 BOE meeting by a representative from Fuss and
O'Neill) . Do to the constant and ongoing issues with aged equipment, the main concentration has been on
making repairs / minor replacements as items break of fail. We do not currently have a vendor on contract to
perform testing and balancing work should new HVAC equipment be installed, and would have to budget for that
work going forward.
4. For the Middle School HVAC work, how will the town handle identification, testing and abatement of hazardous
materials, if necessary?
The BOE has 2 a contracted company Platform Environmental that performs all required annual radon, asbestos,
and DEEP testing and reporting and have been available as needed whenever anything involving hazardous
materials is found or requires abatement and/or removal. They have intimate knowledge of the structural and
mechanical systems of the buildings district wide. They would be our first choice to assist in identifying, testing,
and abating any hazardous materials. We also use Tradebe who is capable of handling this.

Page 20 · open in PDF

From: Silberquit, Evan, PE
To: Mike Walsh
Cc: Betsy Mazzotta; Mark Neumann
Subject: RE: Questions for engineering firms
Date: Monday, November 2, 2026 3:55:59 PM
Attachments: image001.png
 
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you
recognize the sender and know the content is safe.
 
Mike,
Thank you for reaching out.  Please see responses to questions below:
 
1. Please provide the duration of time you would expect the project to require in
months from date that the town signs your contract to the final completion of all
work including punch list items.
BL is anticipating 4-6 weeks to complete the Investigation Phase followed by 10-14
weeks for the Design Phase. The Design Phase includes 2 weeks for Granby’s review at
50% completion. The duration for the approval of the Phase 1 report and decision on
which recommendations to include in the design scope is unknown at this time and not
included in the above estimate. Additionally, construction duration for similar value
projects could range from 6 to 15 months depending on numerous factors.
2. Could you estimate the quantity of meetings that you have included, and define for
us quantity of in person vs remote. Does your in person meetings include some
evening meetings?
We included two in-person meetings, one at the end of each phase. We assumed four
additional virtual meetings. We did not assume any in-person evening meetings, as most
municipalities have moved away from them in recent years. We are willing to modify this
approach based on the Town’s feedback.  
3. Does your proposal include assistance with approvals and or permitting with
applicable governing bodies such as inland wetlands and waterways and DEEP?
As the RFP did not request permitting support, we did not include. Permitting typically
occurs once the construction phase begins.
4. Could you indicate how long permitting has been taking, in your experience, for
this type of work.
This varies by municipality, although we see that the Granby building official allows up to

Page 21 · open in PDF

30 days to approve or request revisions to a submitted application.
5. Assuming approval by the voters early December, then time for final contract
acceptance, we could probably not begin work until 1/1/27. What work would you
expect to be able to accomplish during the winter months?
It is anticipated that both phases of our work can be performed during winter months.
Outdoor assessments will have to be coordinated with weather conditions.
6. Reimbursables or Direct Costs was not spelled out in all of the proposals. Can you
estimate the expenditure that would be expected for Granby to include in
budgeting?
Based on the number of meetings above, plus our expected site visits to support the
project, we have included all reimbursable expenses and direct costs in our fixed fee.
7. Does your proposal include any presentation materials which can either be
displayed at the Town Hall or digitally?
Presentation and marketing materials were not requested and not included in our
proposal. However, we are open to discussing specific needs to support this project.
8. Are there any items that you would consider long lead items that could impact our
schedule?
Recently, electrical switchgear has been the most problematic in terms of lead time.
However, until final scope has been determined, it is unclear whether new switchgear
will be required.
 
 
Evan Silberquit, PE
Manager, MEP Engineering
Principal
BL Companies | Employee owned. Client driven.
 
355 Research Parkway, Meriden, CT 06450
direct: 860.760.1907 | cell: 860.803.0940
main: 860.249.2200
www.blcompanies.com
 

Page 22 · open in PDF

 
 
 
 
CT  
 
 
H2M Architects, Engineers, Geology, Land Surveying and Landscape Architecture, DPC (NY) offers its services in NY only 
H2M Architects & Engineers, Inc. (NJ) offers its services in NJ, CT, DE, FL, LA, MA, PA, RI, SC, VA only 
H2M Associates, Inc. (NJ) offers its engineering, land surveying, landscape architecture services in NJ only h2m.com 
October 26, 2026 
 
Mr. Michael P. Walsh 
Granby Town Manager 
15 N. Granby Road 
Granby, CT 06035 
 
Re:    Proposal for Granby Middle School HVAC Replacements  
 Responses to Additional Questions 
H2M Proposal No.: LP262054 
  
Dear Mr. Walsh: 
 
On behalf of H2M Architects & Engineers, Inc. (H2M), thank you for the opportunity to provide additional 
information regarding our proposal for the Town of Granby’s Middle School MEP project. We appreciate the 
Committee’s review and offer the following responses to its questions. 
1. Anticipated Project Duration 
Assuming the Town authorizes H2M to proceed on or about January 1, 2027, we anticipate an overall project 
duration of approximately 22 months, with final completion, including construction and punch list activities, 
occurring in approximately October 2028. 
A preliminary schedule would generally include: 
▪ January through early Spring 2027: Project initiation, document review, field investigations, system 
evaluations, and development of preliminary recommendations. 
▪ Spring 2027: Design development, construction documents, cost estimating, and coordination with the 
Town and applicable regulatory agencies. 
▪ Early Summer 2027 through Spring 2028: Permit reviews, bidding, contractor selection, and 
procurement of long-lead equipment. 
▪ Summer 2028: Construction, startup, testing, and commissioning activities during the period of reduced 
school occupancy. 
▪ Early Fall 2028: Final inspections, closeout documentation, and completion of punch list items. 
The attached detailed schedule may be refined as the scope is confirmed and will depend on permitting 
requirements, Town review periods, school access, contractor availability, and equipment lead times. 
2. Meetings 
Our proposal includes meetings at key milestones throughout the project. We anticipate approximately eight 
to ten meetings, consisting of an appropriate combination of in-person and remote meetings. 
 
Our proposed approach is to have H2M’s Project Manager attend regular coordination meetings in person 
when beneficial, with mechanical, electrical, and other technical staff participating either in person or remotely, 
based on the meeting agenda. Key site investigations, design reviews, public presentations, and construction 
meetings will be attended in person, as appropriate. H2M is flexible regarding meeting format and can 
accommodate a reasonable number of evening meetings when required for presentations to the Committee, 
Town boards, or the public. H2M did not include any pre-bond approval support associated with our fee.  
1 

Page 23 · open in PDF

H2M Proposal #262054 
October 26, 2026 
Page 2 of 3  
 
3. Regulatory Approvals and Permitting 
Regulatory building permitting through the Town of Granby is included in our proposed services. Based on 
our current understanding that all proposed improvements will be confined to the existing building envelope, 
applications to the Inland Wetlands and Watercourses Commission (IWWC) and Connecticut Department of 
Energy and Environmental Protection (CTDEEP) are not anticipated. Should the project scope change to 
include exterior work or site disturbance, the need for additional regulatory approvals will be re-evaluated. 
4. Anticipated Permitting Duration 
Based on the current project scope, regulatory review is expected to be limited to building permitting through 
the Town of Granby. For preliminary scheduling purposes, we recommend allowing approximately three to six 
months for permit review and approval. The actual duration will depend on the final scope of work, 
completeness of the submission, and the Town’s review schedule. H2M will coordinate permitting 
requirements early in the design process and incorporate the anticipated review period into the overall project 
schedule. 
5. Work During the Winter Months 
A January 2027 start date will allow H2M to advance a substantial portion of the project during the winter, 
including: 
▪ Project kickoff and coordination with Town and school representatives. 
▪ Review of available record drawings, reports, operating information, and prior studies. 
▪ Field verification of accessible mechanical, electrical, plumbing, and building systems. 
▪ Interviews with facilities and maintenance personnel. 
▪ Evaluation of existing equipment condition and system performance. 
▪ Identification and evaluation of potential improvement alternatives. 
▪ Development of conceptual recommendations and preliminary cost estimates. 
▪ Preparation of design documents and early coordination with applicable permitting agencies. 
We will coordinate detailed field investigations to be scheduled on January 18 and 19 while the school is 
closed for Martin Luther King Day and a Professional Development Day to take advantage of when students 
are not present but the building remains accessible. This minimizes disruption while allowing the design to 
progress during the school year. 
6. Reimbursable and Direct Costs 
H2M does not anticipate charging the Town separately for routine travel associated with the services described 
in our proposal.  
Direct regulatory fees, permit application fees, specialized testing, and other third-party fees are not included 
in our proposed professional fee. Because these costs depend on the final scope of work and approvals 
required, they cannot be reliably estimated until the permitting needs are identified. H2M will advise the Town 
of anticipated direct costs before they are incurred and will not proceed with material additional expenses 
without the Town’s authorization. 
7. Presentation Materials 
H2M can provide presentation support and materials suitable for display at Town Hall or digital distribution. 
Depending on the project phase, these materials may include: 
▪ Existing-condition summaries. 
2 

Page 24 · open in PDF

H2M Proposal #262054 
October 26, 2026 
Page 3 of 3  
 
▪ Photographs and diagrams. 
▪ Recommended improvement alternatives. 
▪ Preliminary project schedules. 
▪ Opinion-of-cost summaries. 
▪ Presentation boards or digital exhibits. 
▪ PowerPoint materials for Committee, Board, or public presentations. 
The format and level of detail will be coordinated with the Town based on the intended audience and purpose. 
8. Long-Lead Items 
Major mechanical and electrical equipment may have extended manufacturing and delivery periods. Potential 
long-lead items may include HVAC equipment, electrical distribution equipment, switchgear, transformers, 
generators, controls, and certain custom-fabricated components. 
Depending on the selected systems and market conditions at the time of procurement, lead times may range 
from several months to more than one year. H2M will identify long-lead equipment during design and will 
evaluate strategies such as early equipment selection, pre-purchasing, advance procurement packages, 
approved equivalent equipment, and phased construction. 
Equipment availability is one of the primary reasons we recommend planning for construction during the 
summer of 2028 rather than summer 2027. This schedule provides adequate time for design, permitting, 
bidding, equipment procurement, and coordination of construction activities around school operations. 
H2M appreciates the opportunity to provide additional clarification on our proposed approach. Our team 
understands the coordination required to successfully complete improvements within an occupied school 
environment, particularly when it comes to scheduling work, maintaining school operations, securing permits, 
and planning for long-lead equipment. We are ready to begin upon authorization and will work closely with the 
Town and School District to keep the project moving while minimizing disruption to students, staff, and the 
community. Our goal is straightforward: deliver practical, cost-effective improvements that meet the Middle 
School’s needs now and well into the future. 
 
We encourage you to contact the following references regarding H2M’s school experience: 
▪ ADV Construction Group (CM, Elmont School District): Frank Marino, 
fmarino@advconstructiongroup.com, 516.546.3221 
▪ White Plains School District: Frank Stefanelli, frankstefanelli@wpcsd.k12.ny.us, 914.422.2049 
 
If you have any additional questions or would like further information regarding our proposal, please feel free 
to contact me at 860.607.9011 x1034 or glevasseur@h2m.com. Thank you again for your consideration. We 
look forward to the opportunity to partner with the Town. 
 
Respectfully Submitted, 
H2M Architects & Engineers, Inc. 
 
 
 
 
Gregory J. Levasseur, P.E.    Alexander Hochhausl, P.E.     
Vice President, Windsor Office Director  Vice President, Mechanical Discipline Lead  
              
J:\PROPS\2026\262054 (T.Granby-Eng Svcs-Athletic Fields) Muni-CT\02 Working Files\LP262054\LP262054 Granby MS HVAC-Response 
Letter.docx 
3 

Page 25 · open in PDF

ID Task Name Duration Start Finish Predecessors
1 Granby Middle School HVAC Replacements 464 days Mon 1/11/27 Thu 10/19/28
2 Design Phase 180 days Mon 1/11/27 Fri 9/17/27
3 Phase 1: Pre-Design / Field Survey / Schematic 
Design
30 days Mon 1/11/27 Fri 2/19/27
4 Notice to Proceed 0 days Mon 1/11/27 Mon 1/11/27
5 Projeck Kick-Off Meeting 1 day Mon 1/11/27 Mon 1/11/27 4
6 Field Investigation 2 days Mon 1/18/27 Tue 1/19/27
7 Review existing documentation and drawings 5 days Mon 1/11/27 Fri 1/15/27 4
8 Prepare Basis of Design Memo 5 days Wed 1/20/27 Tue 1/26/27 6
9 Basis of Design Scope Review Meeting 0 days Fri 1/29/27 Fri 1/29/27 8FS+3 days
10 Schematic design plans/sketches 15 days Mon 2/1/27 Fri 2/19/27 9
11 Develop Schematic Design Cost Opinion 4 days Mon 2/15/27 Thu 2/18/27 9FS+10 days
12 Schematic Design Review Meeting 0 days Thu 2/18/27 Thu 2/18/27 11
13 Phase 2: Design and Construction Documents 151 days Fri 2/19/27 Fri 9/17/27
14 60% Design Development Documents 30 days Fri 2/19/27 Thu 4/1/27
15 Prepare drawings and technical specifications 20 days Fri 2/19/27 Thu 3/18/27 12
16 H2M QA/QC 5 days Fri 3/19/27 Thu 3/25/27 15
17 60% Design Submission 0 days Thu 3/25/27 Thu 3/25/27 16
18 60% GPS Design Review 5 days Fri 3/26/27 Thu 4/1/27 17
19 60% Design Review Meeting 0 days Thu 4/1/27 Thu 4/1/27 18
20 100% Construction Documents 30 days Fri 4/2/27 Thu 5/13/27
21 Prepare drawings and technical specifications 20 days Fri 4/2/27 Thu 4/29/27 19
22 H2M QA/QC 5 days Fri 4/30/27 Thu 5/6/27 21
23 100% Design Submission 0 days Thu 5/6/27 Thu 5/6/27 22
24 100% GPS Design Review 5 days Fri 5/7/27 Thu 5/13/27 23
25 100% Design Review Meeting 0 days Thu 5/13/27 Thu 5/13/27 24
26 Permit Review 91 days Fri 5/14/27 Fri 9/17/27
27 Permit Review Submission 1 day Fri 5/14/27 Fri 5/14/27 25
28 Permit Review Period 80 days Mon 5/17/27 Fri 9/3/27 27
29 Permit Approval 0 days Fri 9/3/27 Fri 9/3/27 28
30 Bid Ready 10 days Mon 9/6/27 Fri 9/17/27 29
31 Bid Phase 56 days Fri 9/17/27 Mon 12/6/27
32 Bid Advertisement 0 days Fri 9/17/27 Fri 9/17/27 13
33 Bid Opening 21 days Mon 9/20/27 Mon 
10/18/27
32
34 Bid Review Period 10 days Tue 10/19/27 Mon 11/1/27 33
35 Interview Contractors 5 days Tue 11/2/27 Mon 11/8/27 34
36 Contract Execution Period 20 days Tue 11/9/27 Mon 12/6/27 35
37 Construction Phase 228 days Tue 12/7/27 Thu 
10/19/28
38 Notice to Proceed 1 day Tue 12/7/27 Tue 12/7/27 36
39 Pre-Construction Meeting 1 day Tue 
12/14/27
Tue 
12/14/27
36FS+5 days
40 Equipment Procurement 147 days Wed 12/8/27 Thu 6/29/28
41 Shop Drawings 64 days Wed 12/8/27 Mon 3/6/28
42 Procure Shop Drawings 60 days Wed 12/8/27 Tue 2/29/28 38
43 H2M Review Shop Drawing 60 days Tue 12/14/27 Mon 3/6/28 38SS+5 days
44 Fabrication 80 days Tue 3/7/28 Mon 6/26/28 43
45 Equipment Delivery 3 days Tue 6/27/28 Thu 6/29/28 44
46 HVAC Replacements Construction 50 days Fri 6/30/28 Thu 9/7/28
47 Electrical 30 days Fri 7/14/28 Thu 8/24/28 45FS+10 
days
48 Mechanical 40 days Fri 6/30/28 Thu 8/24/28 45
49 Plumbing 20 days Fri 7/28/28 Thu 8/24/28 45FS+20 
days
50 Startup, Testing and Commisioning 10 days Fri 8/25/28 Thu 9/7/28 47
51 Project Closeout 30 days Fri 9/8/28 Thu 
10/19/28
52 Final Inspections 1 day Fri 9/8/28 Fri 9/8/28 50
53 Punch List 20 days Fri 9/8/28 Thu 10/5/28 50
54 Project Closeout Documentation 30 days Fri 9/8/28 Thu 10/19/28 50
10/191/11 10/19
Granby Middle School HVAC Replacements 
1/11 9/17
Design Phase
1/11 2/19
Phase 1: Pre-Design / Field Survey / Schematic Design
1/11
1/11 1/11
Projeck Kick-Off Meeting
1/18 1/19
Field Investigation
1/11 1/15
Review existing documentation and drawings 
1/20 1/26
Prepare Basis of Design Memo
1/29
2/1 2/19
Schematic design plans/sketches
2/15 2/18
Develop Schematic Design Cost Opinion
2/18
2/19 9/17
Phase 2: Design and Construction Documents
2/19 4/1
60% Design Development Documents 
2/19 3/18
Prepare drawings and technical specifications
3/19 3/25
H2M QA/QC
3/25
3/26 4/1
60% GPS Design Review
4/1
4/2 5/13
100% Construction Documents 
4/2 4/29
Prepare drawings and technical specifications
4/30 5/6
H2M QA/QC
5/6
5/7 5/13
100% GPS Design Review
5/13
5/14 9/17
Permit Review
5/14 5/14
Permit Review Submission
5/17 9/3
Permit Review Period
9/3
9/6 9/17
Bid Ready
12/69/17 12/6
Bid Phase 
9/17
9/20 10/18
Bid Opening
10/19 11/1
Bid Review Period
11/2 11/8
Interview Contractors
11/9 12/6
Contract Execution Period
10/1912/7 10/19
Construction Phase 
12/7 12/7
Notice to Proceed
12/14 12/14
Pre-Construction Meeting
12/8 6/29
Equipment Procurement
3/612/8 3/6
Shop Drawings
12/8 2/29
Procure Shop Drawings
12/14 3/6
H2M Review Shop Drawing
3/7 6/26
Fabrication
6/27 6/29
Equipment Delivery
6/30 9/7
HVAC Replacements Construction
7/14 8/24
Electrical 
6/30 8/24
Mechanical 
7/28 8/24
Plumbing
8/25 9/7
Startup, Testing and Commisioning
9/8 10/19
Project Closeout
9/8 9/8
Final Inspections
9/8 10/5
Punch List
9/8 10/19
Project Closeout Documentation
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Qtr 4, 2026 Qtr 1, 2027 Qtr 2, 2027 Qtr 3, 2027 Qtr 4, 2027 Qtr 1, 2028 Qtr 2, 2028 Qtr 3, 2028 Qtr 4, 2028 Qtr 1, 2029
Project: Granby Middle School HVAC Replacements 
Esitimated Project Construction Schedule
Date: Mon 10/26/26
Page 1
4 

Page 26 · open in PDF

District-Wide HVAC Upgrades • 
White Plains City 
School District
White Plains, NY
SERVICES  
PROVIDED
Mechanical Engineering
Heating
Ventilation
Air Conditioning
Chiller Plants
Construction Cost: $5.1 million
The White Plains City School District needed HVAC equipment upgrades at the Church Street Elementary School, George 
Washington Elementary School, Mamaroneck Avenue Elementary School, Ridgeway Elementary School, Rochambeau 
School, Eastview Middle School, Highlands Middle School and White Plains High School.
We provided complete engineering services from investigation 
through the construction administration phase for the district-
wide, multi-building HVAC equipment upgrades.  This project 
included the following:
• Replacement of HVAC and H&V central station air handling 
units in capacities ranging from 1,000 to 38,000 cfm.  Heating 
coil types included both low pressure steam and hot water.  
Cooling coil types included both direct expansion (DX) and 
chilled water
• Installation of 125 ton air-cooled, chilled water plant
• Replacement of unit ventilators of varying types - heating 
coils included low pressure steam, hot water and electric - 
direct expansion (DX) type cooling coils with remote mounted 
air-cooled condensing units were utilized in several units
• Replacement of gas-fired HVAC rooftop units in capacities 
ranging from eight to 30 tons
• Installation of a commercial kitchen exhaust hood, ansul 
system and make-up air unit
• Replacement of roof mounted, in-line and ceiling exhaust fans
• Utilization of control strategies such as single-zone variable 
air volume and demand controlled ventilation when possible 
to increase energy efficiency
• Upgrade of existing Building Automation System (BAS) for 
integration of new equipment - upgrade included new DDC 
controllers and a front-end computer graphical interface to 
allow for remote equipment monitoring and adjustment
We worked closely with the facility to develop a construction 
phasing plan that spanned a total of three years to minimize any 
impact on the existing operations of the buildings.
5 

Page 27 · open in PDF

District-Wide HVAC Replacements • 
Elmont School District
Elmont, NY SERVICES  PROVIDED
Architectural Design
Electrical Evaluations
Interior/Exterior Lighting
Power Distribution Systems
Environmental Investigation 
& Abatement
Mold, Asbestos, & Lead
Energy/Building  
Systems Management
Energy Recovery Systems
Heating, Ventilation, &  
Air Conditioning
Variable Refrigerant Flow 
(VRF) Systems
HVAC/Electrical Upgrade 
Support
Construction Cost: $35 million
H2M replaced and upgraded the Elmont School District’s HVAC infrastructure to a more efficient, state-of-the-art system.
The Elmont School District’s HVAC equipment had exceeded 
its life expectancy. Across the District’s six buildings, the old  
oil-fired steam boiler plant needed to serve approximately 500,000 
square feet of classrooms, gymnasiums, auditoriums, libraries, 
cafeterias, and administrative offices. To avoid mechanical 
failure, improve occupant quality of life, and prepare for New York 
State’s decarbonization goals, the District decided to upgrade to 
a state-of-the-art, high-efficiency, all-electric HVAC system. The 
community passed a $52 million bond, $35 million of which was 
reserved for HVAC upgrades. This upgrade comprises variable 
refrigerant flow (VRF) heat pump systems with dedicated outside 
air system (DOAS) rooftop units that will provide pre-filtered and 
conditioned air and individual space heating and cooling control.
H2M began by performing extensive field surveys to document 
the existing system and spaces and develop a plan. Each 
building needed new ductwork, piping, electrical services, and 
structural reinforcements for the new equipment. The scope of 
work includes adding ventilation and a building management 
system to enable monitoring and precision control; replacing the 
existing exhaust infrastructure, including toilet exhaust; installing 
new ceilings and efficient lighting; and removing the underground 
oil storage tanks and old boilers.
The work will be conducted over three years. During the 
school year, work in the classrooms will take place after-hours. 
All construction and demolition is phased to only impact a 
few classrooms at a time. Classes in the effected zones are 
being relocated to existing empty classrooms for the duration  
of construction.
6 

Page 28 · open in PDF

Village Hall HVAC Renovations • 
Inc. Village of 
Rockville Centre
Rockville Centre, NY
SERVICES  
PROVIDED
HVAC Engineering 
Mechanical Engineering
Air Handler Design
Construction Cost: $1 million
The Village Hall building in the Village of Rockville Centre called for the replacement of all existing perimeter fan coil units 
serving the heating and cooling needs of the existing building.
The proposed design consists of a new heat pump variable 
refrigerant (VRF) system with energy recovery ventilation.  The 
new VRF system design uses ducted fan coil units throughout the 
building.  Space was a challenge for this project as the original 
wood frame structure was not designed to accommodate any 
mechanical systems.  The smaller size of the ducted fan coils 
allowed more flexibility in designing the new HVAC system to fit 
within the available spaces of the building.
The new system was designed to maximize energy savings while 
improving occupant comfort and indoor air quality.  Specifically, 
the new system will introduce mechanical ventilation to all 
occupied spaces, greatly improving the indoor air quality of the 
building.  The new system is designed to replace an existing two-
pipe changeover system that offered little flexibility to building 
occupants to switch between heating and cooling, which was 
done seasonally.  The new system will be able to respond to 
changes in heating/cooling demand quickly and throughout the 
day.  New air handlers that were designed for the project will use 
VRF technology along with single zone VAV control strategies to 
maximize efficiency and occupant comfort. 
7 

Page 29 · open in PDF

HVAC Air Handler Upgrades • 
Levittown Public Library
Levittown, NY SERVICES  
PROVIDED
Design
Bidding
Construction Administration
Construction Cost: $1.15 million
The existing HVAC systems serving the Levittown Public Library had reached the end of their service and were in need of replacement.
H2M performed an investigation of the existing systems and 
provided a feasibility study which included multiple options for 
HVAC upgrades.  After considering first costs, operations and 
maintenance costs, system efficiencies and the impacts of 
construction on the operation of the Library, a project program 
was created.  The design included the demolition of existing 
building air handlers, chiller plant and hot water heating plant.  
New air-cooled equipment was located on the roof to facilitate 
access and maintenance.  A new high efficiency boiler plant was 
provided along with new hot water heating coils.  Existing chilled 
water fan coil units were replaced with variable refrigerant flow 
(VRF) fan coil units and an energy recovery ventilation system.
We provided engineering services from the original investigation 
through construction administration and inspection.  We worked 
closely with the Library’s construction manager in monitoring all 
construction activities and phasing.  Due to the cooperation of all 
parties involved, the Library was able to remain open to the public 
with the duration of construction.
8 

Page 30 · open in PDF

HVAC Upgrades for COVID-19 Mitigation • 
Town of Hempstead
Hempstead, NY SERVICES  
PROVIDED
COVID Mitigation
Heating, Ventilation, and 
Air Conditioning (HVAC)
Energy Recovery Systems
MEP Engineering
Chiller Plants
Heating & Boiler Plants
Construction Cost: $10.8 million
In response to the COVID-19 pandemic, the Town of Hempstead selected H2M to perform a review of all Town buildings and 
provide feasible recommendations and best practices to mitigate COVID-19 transmission.
 
This involved the investigation of approximately 50 Town-owned/
operated buildings in less than one month, which were largely 
unoccupied since March 2020, impacting Town operations. 
This included a wide variety of building types, applications, and 
restraints. The buildings surveyed included a large indoor pool 
complex, the main town hall buildings at 350 Front Street and 1 
Washington, the Conservation and Waterways Admin. building, 
and the main office for the Water Department.
All spaces and mechanical systems were reviewed to determine 
the feasibility of increasing ventilation air, increasing filtration, 
and implementing new technologies, such as UVc and bipolar 
ionization. H2M reviewed the existing system’s condition and 
ability to support the required upgrades. In cases where equipment 
was at or near end of life, replacement was recommended if 
equipment lead time and construction schedule could support it. 
H2M’s mechanical engineering team coordinated extensively with 
various disciplines to prepare plans, including our architectural, 
electrical, and environmental departments. 
H2M worked with the Town’s Purchasing Department to expedite 
the emergency procurement of the equipment and labor contracts. 
Our team interacted closely with the Town HVAC group to ensure 
they were satisfied with equipment selections and that it would 
meet or exceed their operational needs. 
To meet the expedited construction deadline, the project was split 
into multiple separate materials and labor contracts. This allowed 
the expedited equipment procurement process to commence while 
design, construction documents, and bidding occurred in parallel. 
This strategic approach removed the typical linear dependencies 
of a typical design-build project, and greatly compressed the 
schedule. H2M’s mechanical engineers surveyed all buildings in 
less than one month to support the construction completion date 
of December 31, 2020.
The Mechanical team drafted an extensive report for the Town 
which detailed the main buildings where COVID mitigation 
strategies could be implemented. The report also included 
recommendations for the mitigation strategies based on data 
9 

Page 31 · open in PDF

HVAC Upgrades for COVID-19 Mitigation
from ASHRAE and the CDC. The three main recommendations 
were increasing the quantity of outdoor air being brought into 
the various buildings to flush out contaminated air, increasing 
filtration to at least MERV 13, and installing UVc sterilization 
technology as part of HVAC systems. Sterilization options varied 
from UVc devices in the airstream of a packaged unit to portable 
fan filter units with UVc inside of them.
One building that presented unique challenges was the 
“Conservation and Waterways” building located in Lido Beach. The 
initial design involved simply replacing the outdoor chiller which 
had badly corroded due to the saltwater environment, rendering 
it almost inoperable. This prevented the Town from operating the 
air handling unit which resulted in little to no outdoor air being 
brought into the building. Equipment lead times and issues with 
the existing equipment in the mechanical room required further 
action. A different chiller with a special salt resistant coating was 
installed and the mechanical room was completely overhauled 
with new pumps, expansion tanks, and a heat exchanger.
All of the various Town buildings were completed by the December 
31st deadline with the unavoidable exception of the Merrick Golf 
Course building. This exception was allowed due to CARES Act 
provisions for delays caused by COVID19. The factory which 
produced the unit to be installed at the Golf Course experienced 
a COVID outbreak which slowed production and delayed the 
delivery of the equipment.
H2M’s comprehensive review and recommendations for the Town 
of Hempstead enabled significant improvements to indoor air 
quality in all the town buildings due to upgraded filtration, HVAC 
systems, and UVc sterilization. At minimum, building occupants 
are receiving the code required amount of outdoor air, and in 
some cases are greatly surpassing the code requirements.
10 

Page 32 · open in PDF

Heating Plant Replacement • 
Hastings-on-Hudson Union 
Free School District
Hastings-on-Hudson, NY
SERVICES  
PROVIDED HVAC Engineering
Construction Cost: $1 million
H2M was selected by the Hastings-on-Hudson Union Free School District to design a replacement heating plant for the 
District’s 25-year-old steam boiler plant.
H2M was selected by the Hastings-on-Hudson Union Free School 
District to design a replacement heating plant for the District’s 
25-year-old steam boiler plant, which had recently begun to fail.
In addition, the District desired to convert their existing steam 
system to a hot water system, as their building heating systems 
were operated with hot water. 
H2M performed a conversion from steam boilers to hot water 
boilers to meet the District’s needs. Both existing steam boilers 
and existing heat exchangers were removed.  After an evaluation 
of the existing heating plant, H2M found that the existing burners 
were only a few years old and could be reused, helping to reduce 
the overall project budget. H2M also reused the recently replaced 
existing hydronic pump sets to further reduce construction costs.  
The conversion from steam to hot water was more efficient, so 
H2M was able to specify smaller boilers, which also helped save 
the District construction and operating costs. 
The boiler room was located in the basement of the school, making 
access challenging. The existing boilers had to be removed in 
sections since it was not possible to remove them in one piece. 
To bring the new boilers into the boiler room, H2M proposed 
to remove the existing combustion air louvers to overcome the 
space constraints. H2M confirmed that replacement combustion 
air louvers were sized according to code, and specified new 
louvers with appropriate boiler control system interlocks. The end 
result was a fully functioning heating plant upgrade which fully 
met the design intent of the District.
11 

Page 33 · open in PDF

Energy Audit • 
Confidential Client
Queens, NY SERVICES  PROVIDED Heating Ventilation & Air Conditioning Cooling Towers
Construction Cost: $3.5 million
H2M was selected by a confidential client to conduct an energy analysis, provide system replacement options, develop 
construction documents, and support the client through construction and start-up phases.
The client’s facility was using an outdated steam absorption 
chillers for cooling. Natural gas usage was higher in the summer 
for cooling purposes than in the winter for heating. To improve 
energy efficiency and reduce carbon emissions, the project 
involved replacing the steam boilers with condensing hot water 
boilers and substituting a single absorption chiller with six 50-ton 
modular water-cooled chillers. Retaining the existing condenser 
water systems was cost-effective due to the available roof space. 
As the building already used a hot water system via a heat 
exchanger, the conversion from steam to hot water boilers was 
efficient and cost effective. In addition to the enhanced efficiency 
of the new equipment, this project provided N+1 redundancy and 
capacity to accommodate future loads for both heating and the 
chilled water systems. The building supports a highly diverse load 
profile and includes critical spaces for redundancy. Therefore, 
having turn down capability was critical.
Further improvements in efficiency were achieved by implementing 
variable speed pumping, replacing air handlers with energy 
recovery units, and upgrading the building management system 
to optimize scheduling and economizer operations.
Upon project completion, the building’s carbon emissions were 
reduced by 55% and annual energy cost were reduced by 38%. 
Most of these reductions and savings resulted from switching 
from an absorption chiller to an electric chiller, as there was no 
use for the waste heat previously rejected to the atmosphere. The 
client now has a state-of-the-art HVAC system that is a working 
example of high efficiency and robust design.