Public Building and Capital Project Committee, Oct 14, 2026

Granby minutes posted

Documents

TypeDocumentPagesOpen
minutes Public Building & Capital Project Committee Regular Meeting Minutes 2 PDF download · town site
agenda Public Building & Capital Project Committee Regular Meeting 2 PDF download · town site
packet Public Building & Capital Project Committee Regular Meeting (packet)
Sanitized copy: scripts and attachments were removed and the result checked. The original is kept offline.
Not attached: this packet is 32 MB, too large to host here. Use the town site link.
109 town site

Summary of the minutes

AI-generated summary. Each line links to the PDF page it came from; check it before relying on it.

Read the official minutes (PDF, 2 pages) The PDF is the record; this summary is a guide to it.

The committee approved the September 9, 2026 minutes and voted 9-0-0 to hold off on selecting an engineering firm for the athletic field project and the middle school MEP project. Member questions are due to the chair by October 21, 2026, with a final selection planned for the November 12, 2026 meeting.

Decisions (4) · all reported votes

  1. Approval of PBCPC Regular Meeting Minutes from September 9, 2026
    Approved minutes of September 9, 2026 as presented
    Vote: Motion by W. Pascucci, seconded by M. Lengvarsky, carried 9-0-0 · p. 1
  2. Proposal Acceptance - Engineering Firm for Athletic Field Project
    Acceptance of proposal delayed; committee to send questions to firms via chair and select firm at November 12, 2026 meeting
    Vote: Motion by A. Anderson, seconded by M. Gottlieb, carried 9-0-0 · p. 1
  3. Proposal Acceptance - Engineering Firm for MEP for Middle School
    Acceptance of proposal delayed; all member questions on the two proposals to be sent to M. Neumann by October 21, 2026, forwarded to M. Walsh for distribution to contractors, and firm to be selected at November 12, 2026 meeting
    Vote: Motion by A. Anderson, seconded by M. Gottlieb, carried 9-0-0 · p. 1
  4. Adjournment and next meeting
    Committee adjourned at approximately 6:25 p.m.; next regular meeting set for Wednesday, November 12, 2026, at 6 p.m. at the Senior Center
    Vote: Motion by A. Anderson, seconded by M. Gottlieb, carried 9-0-0 · p. 2

Also discussed (1)

  • Requests for hard copy of proposal materials: A. Anderson and M. Gottlieb requested all proposal materials in hard copy; M. Walsh indicated this would be done · p. 1
Summary of the agenda: Public Building & Capital Project Committee Regular Meeting

AI-generated summary.

This is the agenda for the Granby Public Building & Capital Project Committee special meeting on October 14, 2026, at the Senior Center. Items on the agenda include approval of three sets of prior minutes and proposed acceptance of engineering firm proposals for the athletic field project and the middle school MEP work.

On the agenda (5)

  1. Approval of PBCPC Regular Meeting Minutes - September 9, 2026 · p. 1
  2. Approval of PBCPC Special Meeting Minutes - September 16, 2026 · p. 1
  3. Approval of PBCPC Special Meeting Minutes - September 23, 2026 · p. 1
  4. Proposal Acceptance - Engineering Firm For Athletic Field Project · p. 1
  5. Proposal Acceptance - Engineering Firm For MEP For Middle School Project · p. 1

This PDF is a scan; its text was read by OCR and may contain errors.

Full text of the documents

View the minutes PDF on this page (Public Building & Capital Project Committee Regular Meeting Minutes) Open the PDF
Text of the minutes (Public Building & Capital Project Committee Regular Meeting Minutes, 2 pages)

Page 1 · open in PDF

 
 
TOWN
 
OF
 
GRANBY
 
 
PUBLIC
 
BUILDING
 
&
 
CAPITAL
 
PROJECT
 
COMMITTEE
 
 
REGULAR
 
MEETING
 
MINUTES
 
 
OCTOBER
 
14,
 
2026
 
 
PRESENT:
 
Chairman
 
Mark
 
Neumann,
 
Anne
 
Adamson,
 
Peter
 
Anderson,
 
Mark
 
Gottlieb,
 
Christopher
 
Lavigne,
 
Michael
 
Lengvarsky,
 
Kent
 
McCord,
 
William
 
Pascucci
 
and
 
David
 
Peling
 
 
ALSO
 
PRESENT:
 
Mike
 
Walsh,
 
Town
 
Manager
  
 
ABSENT:
 
Kent
 
McCord
 
 
1.
 
PLEDGE
 
OF
 
ALLEGIANCE
 
 
2.
 
MINUTES
 
 
2.I.
 
Approval
 
of
 
PBCPC
 
Regular
 
Meeting
 
Minutes
 
from
 
September
 
9,
 
2026
 
 
ON
 
A
 
MOTION
 
by
 
W.
 
Pascucci,
 
seconded
 
by
 
M.
 
Lengvarsky,
 
the
 
committee
 
voted
 
(9-0-0)
 
to
 
approve
 
the
 
minutes
 
of
 
September
 
9,
 
2026,
 
as
 
presented.
 
 
3.
 
NEW
 
BUSINESS
 
 
3.I.
 
Proposal
 
Acceptance-
 
Engineering
 
Firm
 
for
 
Athletic
 
Field
 
Project
 
M.
 
Walsh,
 
Town
 
Manager,
 
provided
 
an
 
overview
 
of
 
the
 
RFP
 
process
 
to
 
date
 
for
 
both
 
this
 
project
 
and
 
the
 
next
 
agenda
 
item.
 
M.
 
Walsh
 
suggested
 
that
 
committee
 
members
 
take
 
additional
 
time
 
to
 
review
 
the
 
proposals
 
submitted
 
and
 
send
 
questions,
 
via
 
the
 
committee
 
chair,
 
to
 
the
 
firms,
 
and
 
to
 
delay
 
acceptance
 
of
 
a
 
proposal
 
for
 
each
 
project
 
until
 
the
 
next
 
meeting
 
of
 
this
 
committee
 
on
 
November
 
12,
 
2026.
 
M.
 
Neumann
 
opened
 
these
 
suggestions
 
to
 
the
 
committee
 
for
 
discussion.
 
Discussion
 
on
 
both
 
proposals
 
ensued.
 
 
3.II.
 
Proposal
 
Acceptance-
 
Engineering
 
Firm
 
for
 
MEP
 
for
 
Middle
 
School
 
See
 
above
 
minutes
 
regarding
 
3.1.
 
ON
 
A
 
MOTION
 
by
 
A.
 
Anderson,
 
seconded
 
by
 
M.
 
Gottlieb,
 
the
 
committee
 
voted
 
(9-0-0)
 
to
 
send
 
all
 
committee
 
member
 
questions
 
on
 
the
 
two
 
above
 
proposals
 
to
 
M.
 
Neumann
 
by
 
October
 
21,
 
2026,
 
who
 
would
 
then
 
send
 
them
 
to
 
M.
 
Walsh
 
for
 
distribution
 
to
 
the
 
contractors,
 
and
 
to
 
further
 
discuss
 
the
 
proposals
 
and
 
select
  
an
 
engineering
 
firm
 
at
 
the
 
next
 
regular
 
meeting
 
of
 
this
 
committee
 
on
 
November
 
12,
 
2026.
 
An
 
email
 
sent
  
by
 
one
 
contractor
 
supplementing
 
their
 
original
 
RFP
 
submission
 
was
 
shared
 
with
 
the
 
committee.
 
A.
 
Anderson
 
and
 
M.
 
Gottlieb
 
requested
 
all
 
proposal
 
materials
 
be
 
shared
 
with
 
them
 
in
 
hard
 
copy,
 
and
 
M.
 
Walsh
 
indicated
 
that
 
would
 
be
 
done.
 
 
4.
 
DISCUSSION
 
OF
 
ACTION
 
ITEMS
 
FOR
 
THE
 
NEXT
 
MEETING
 
 
The
 
Town
 
Manager
 
and
 
Chairman
 
will
 
create
 
the
 
agenda
 
for
 
the
 
November
 
meeting,
 
which
 
will
 
include
 
discussion
 
of
 
the
 
proposals
 
and
 
any
 
questions
 
sent
 
to
 
the
 
contractors,
 
as
 
well
 
as
 

Page 2 · open in PDF

any responsive information received.  
5. PUBLIC COMMENT  
None 
 
6. ADJOURNMENT:  
ON A MOTION by A. Anderson, seconded by M. Gottlieb, the committee voted (9-0-0) to 
adjourn the meeting at approximately 6:25 p.m.  
The next regular meeting of the Public Building & Capital Project Committee is scheduled for  
Wednesday, November 12, 2026, at 6 p.m. at the Senior Center.  
Respectfully submitted,  
 
 
Stephanie D’Ambrose 
Recording Secretary 
 
View the agenda PDF on this page (Public Building & Capital Project Committee Regular Meeting) Open the PDF
Text read from the scanned agenda (OCR) (Public Building & Capital Project Committee Regular Meeting, 2 pages)

Page 1 · open in PDF

Join Zoom Meeting

https://us02web.zoom.us/j/83482016832?pwd=bHpaXb1faLpO7NAhvYGlCypyGplyoz.1

Meeting ID: 834 8201 6832

Passcode: 902481

TOWN OF GRANBY

Public Building & Capital Project Committee

Special Meeting Agenda

Wednesday, October 14, 2026

6:00 p.m. Senior Center

1. Pledge Of Allegiance

2. Minutes

2.I. Approval Of PBCPC Regular Meeting Minutes - September 9, 2026

Documents:

PBCPC MINUTES 09-09-2026.PDF

2.II. Approval Of PBCPC Special Meeting Minutes - September 16, 2026

Documents:

PBCPC MINUTES 09-16-2026.PDF

2.III. Approval Of PBCPC Special Meeting Minutes - September 23, 2026

Documents:

PBCPC MINUTES 09-23-2026.PDF

3. New Business

3.I. Proposal Acceptance - Engineering Firm For Athletic Field Project

Documents:

BENESCH SCOPE AND FEE FOR INTEGRATED SERVICES - GRANBY

ATHLETIC FIELDS.PDF

BSC GROUP PROPOSAL.PDF

SLR GRANBY FIELDS PROPOSAL.PDF

3.II. Proposal Acceptance - Engineering Firm For MEP For Middle School Project

Documents:

BL COMPANIES MEP WORK AT GRANBY MIDDLE SCHOOL.PDF

H2M MEP LP262054 GRANBY MS HVAC.PDF

4. Discussion Of Action Items For The Next Meeting

5. Adjournment

Page 2 · open in PDF

The next regular meeting of the Public Building & Capital Project Committee is scheduled for Thursday, November 12, 2026 at 6 p.m. at the Senior Center.
Text of the packet (Public Building & Capital Project Committee Regular Meeting (packet), 109 pages)

Page 1

Join Zoom Meeting
https://us02web.zoom.us/j/83482016832?pwd=bHpaXb1faLpO7NAhvYGlCypyGpIyoz.1
Meeting ID: 834 8201 6832
Passcode: 902481
TOWN OF GRANBY
Public Building & Capital Project Committee
Special Meeting Agenda
Wednesday, October 14, 2026
6:00 p.m. Senior Center
Pledge Of Allegiance
Minutes
Approval Of PBCPC Regular Meeting Minutes - September 9, 2026
PBCPC MINUTES 09-09-2026.PDF
Approval Of PBCPC Special Meeting Minutes - September 16, 2026
PBCPC MINUTES 09-16-2026.PDF
Approval Of PBCPC Special Meeting Minutes - September 23, 2026
PBCPC MINUTES 09-23-2026.PDF
New Business
Proposal Acceptance - Engineering Firm For Athletic Field Project
BENESCH SCOPE AND FEE FOR INTEGRATED SERVICES - GRANBY 
ATHLETIC FIELDS.PDF
BSC GROUP PROPOSAL.PDF
SLR GRANBY FIELDS PROPOSAL.PDF
Proposal Acceptance - Engineering Firm For MEP For Middle School Project
BL COMPANIES MEP WORK AT GRANBY MIDDLE SCHOOL.PDF
H2M MEP LP262054 GRANBY MS HVAC.PDF
Discussion Of Action Items For The Next Meeting
Adjournment
The next regular meeting of the Public Building & Capital Project Committee is 
scheduled for Thursday, November 12, 2026 at 6 p.m. at the Senior Center.
1.
2.
2.I.
Documents:
2.II.
Documents:
2.III.
Documents:
3.
3.I.
Documents:
3.II.
Documents:
4.
5.

Page 2

Join Zoom Meeting
https://us02web.zoom.us/j/83482016832?pwd=bHpaXb1faLpO7NAhvYGlCypyGpIyoz.1
Meeting ID: 834 8201 6832
Passcode: 902481
TOWN OF GRANBY
Public Building & Capital Project Committee
Special Meeting Agenda
Wednesday, October 14, 2026
6:00 p.m. Senior Center
Pledge Of Allegiance
Minutes
Approval Of PBCPC Regular Meeting Minutes - September 9, 2026
PBCPC MINUTES 09-09-2026.PDF
Approval Of PBCPC Special Meeting Minutes - September 16, 2026
PBCPC MINUTES 09-16-2026.PDF
Approval Of PBCPC Special Meeting Minutes - September 23, 2026
PBCPC MINUTES 09-23-2026.PDF
New Business
Proposal Acceptance - Engineering Firm For Athletic Field Project
BENESCH SCOPE AND FEE FOR INTEGRATED SERVICES - GRANBY 
ATHLETIC FIELDS.PDF
BSC GROUP PROPOSAL.PDF
SLR GRANBY FIELDS PROPOSAL.PDF
Proposal Acceptance - Engineering Firm For MEP For Middle School Project
BL COMPANIES MEP WORK AT GRANBY MIDDLE SCHOOL.PDF
H2M MEP LP262054 GRANBY MS HVAC.PDF
Discussion Of Action Items For The Next Meeting
Adjournment
The next regular meeting of the Public Building & Capital Project Committee is 
scheduled for Thursday, November 12, 2026 at 6 p.m. at the Senior Center.
1.
2.
2.I.
Documents:
2.II.
Documents:
2.III.
Documents:
3.
3.I.
Documents:
3.II.
Documents:
4.
5.

Page 3

TOWN OF GRANBY 
PUBLIC BUILDING & CAPITAL PROJECT COMMITTEE 
REGULAR MEETING MINUTES 
SEPTEMBER 9, 2026 
 
PRESENT: Chairman Mark Neumann, Anne Adamson, Peter Anderson, Mark Gottlieb,  
Christopher Lavigne, Michael Lengvarsky,  Kent McCord, William Pascucci and David Peling 
 
ALSO PRESENT: Cheri Burke, Superintendent of School and Mike Walsh, Town Manager  
 
ABSENT: None 
 
1. PLEDGE OF ALLEGIANCE 
 
2. MINUTES 
2.I. Approval of PBCPC Regular Meeting Minutes – August 12, 2026 
ON A MOTION by W. Pascucci, seconded by D. Peling, the committee voted 
(9-0-0) to approve the minutes of August 12, 2026, as presented. 
 
3. NEW BUSINESS 
3.I. Subcommittee Recommendations – Engineering Interviews 
The subcommittee met and selected the six engineering firms to be interviewed by the 
PBCPC at a special meeting of the full committee on Wednesday, September 16, 2026. 
The selected firms are: Benesch, BL Companies, BSC Group, H2M, SLR and pHLow. 
 
3.II. Set a Special Meeting for September 16, 2026, at 6 p.m. at the Senior Center 
ON A MOTION by A. Adamson, seconded by K. McCord, the committee voted 
(9-0-0) to set a special meeting of the Public Building and Capital Project Committee for 
Wednesday, September 16, 2026. 
 
ON A MOTION by W. Pasucci, seconded by M. Gottlieb, the committee voted 
(9-0-0) to set a nother special meeting of the Public Bui lding and Capital Project 
Committee for Wednesday, September 23, 2026, to discuss the inter views and select 
an engineering firm. 
 
3.III. Agenda Amendment to Set a Special Meeting for September 23, 2026 
ON A MOTION by W. Pasucci, seconded by D. Peling, the committee voted 
(9-0-0) to amend the agenda to include an  item to add the special meeting on 
September 23, 2026, and accept the motion. 
 
4. DISCUSSION OF ACTION ITEMS FOR THE NEXT MEETING 
The Town Manager and Chairman will create the agenda for the October meeting. 
 
5. PUBLIC COMMENT 
Curt Johnson, One Fielding Woods, Wes t Granby commented on the capital projects and 
supports the hiring of an engineering firm. 
  

Page 4

PBCPC Minutes 
9/9/26 
Page 2 
  
6. ADJOURNMENT: 
ON A MOTION by D. Peling , seconded by  W. Pascucci , the committee voted (9-0-0) to 
adjourn the meeting at 7:00 p.m. 
 
The next regular meeting of the Public Building & Capital Project Committee is scheduled for 
Wednesday, October 14, 2026, at 6p.m. at the Senior Center. 
 
 
Respectfully submitted,  
 
Betsy Mazzotta 
Recording Secretary 

Page 5

TOWN OF GRANBY 
PUBLIC BUILDING & CAPITAL PROJECT COMMITTEE 
SPECIAL MEETING MINUTES 
SEPTEMBER 16, 2026 
 
PRESENT: Chairman Mark Neumann, Anne Adamson, Peter Anderson, Mark Gottlieb,  Michael 
Lengvarsky (via Zoom),  Kent McCord and William Pascucci 
 
ALSO PRESENT: Cheri Burke, Superintendent of School and Mike Walsh, Town Manager  
 
ABSENT: David Peling, Christopher Lavigne 
 
1. PLEDGE OF ALLEGIANCE 
 
2. MINUTES 
2.I. None 
 
3. NEW BUSINESS 
3.I. Engineering Firm Interviews 
The committee heard presentations and interviewed the six engineering firms identified 
by the subcommittee for further consideration and completed scoring sheets for each. 
The Town Manager will compile the scoring sheets  and distribute the summary to the 
committee before the next meeting. 
 
A special meeting of the Public Building and Capital Projects committee will be held on 
Wednesday, September 23, 2026, at 6:00 p.m. at the Senior Center to review the results 
and select the firm(s) to engage for the projects. 
 
4. DISCUSSION OF ACTION ITEMS FOR THE NEXT MEETING 
The Town Manager and Chairman will create the agenda for the October meeting. 
 
5. ADJOURNMENT: 
ON A MOTION by  W. Pascucci, seconded by  P. Anderson, the committee  voted (6-0-0) to 
adjourn the meeting at 9:37 p.m. 
 
The next regular meeting of the Public Building & Capital Project Committee is scheduled for 
Wednesday, October 14, 2026, at 6p.m. at the Senior Center. 
 
 
Respectfully submitted,  
 
Betsy Mazzotta 
Recording Secretary 

Page 6

TOWN OF GRANBY 
PUBLIC BUILDING & CAPITAL PROJECT COMMITTEE 
SPECIAL MEETING MINUTES 
SEPTEMBER 23, 2026 
 
PRESENT: Chairman Mark Neumann, Anne Adamson, Peter Anderson, Mark Gottlieb,  
Christopher Lavigne, Michael Lengvarsky, William Pascucci and David Peling  
 
ALSO PRESENT: Mike Walsh, Town Manager  
 
ABSENT: Kent McCord 
 
1. PLEDGE OF ALLEGIANCE 
 
2. MINUTES 
2.I. None 
 
3. NEW BUSINESS 
3.I. Engineering Firm Selection – Review Scoring with Discussion 
The committee discussed the scoring and the six engineering firms interviewed at the 
PBCPC meeting on September 16, 2026. The following motions were made at the 
conclusion of the group discussion. 
 
ON A MOTION by M. Lengvarsky, seconded by M. Gottlieb, the Public Building and 
Capital Project Committee voted ( 7-0-1) to return to the engineering firms of Benesch, 
BSC Group and SLR with a detailed Request for Proposal on the settling issue related 
to the high school athle tic fields and to request a proposed solution and an est imated 
cost. C. Lavigne did not participate in the interviews  and therefore abstained from the 
vote. 
 
ON A MOTION by M. Gottlieb, seconded by A. Adamson, the Public Building and Capital 
Project Committee voted (7-0-1) to recommend the engineering firm of Benesch as the 
on-call engineering firm for use by the Town of Granby  for projects including the  
pickleball courts and bathroom at Salmon Brook Park. The agreement would not include 
the high school athletic fields, MEP services for the middle school or the sewer project. 
C. Lavigne did not participate in the interviews and therefore abstained from the vote. 
 
ON A MOTION by M. Lengvarsky, seconded by A. Adamson, the Public Building and 
Capital Project Committee voted ( 7-0-1) to return to the engineering firms of BL 
Companies and H2M and request a detailed report on their MEP capabilities. C. Lavigne 
did not participate in the interviews and therefore abstained from the vote. 
 
ON A MOTION by W. Pascucci , seconded by M. Gottlieb , the Public Building and 
Capital Project Committee voted ( 7-0-1) to  recommend pHlow as the on -call 
engineering firm for use by the Town of Granby for sewer projects.  C. Lavigne did not 
participate in the interviews and therefore abstained from the vote. 
 
4. DISCUSSION OF ACTION ITEMS FOR THE NEXT MEETING 
Town Manager Mike Walsh will provide an update to the committee on the follow up requests 
for the high school athletic fields project and the MEP services. 

Page 7

PBCPC Minutes 
9/23/26 
Page 2 
  
 
5. ADJOURNMENT: 
ON A MOTION by D. Peling, seconded by  M. Lengvarsky, the committee voted (8-0-0) to 
adjourn the meeting at 7:02 p.m. 
 
The next regular meeting of the Public Building & Capital Project Committee is scheduled for 
Wednesday, October 14, 2026, at 6p.m. at the Senior Center. 
 
 
Respectfully submitted,  
 
Betsy Mazzotta 
Recording Secretary 

Page 8

Page 9

200 Glastonbury Blvd., Suite 201 
Glastonbury, CT 06033 
www.benesch.com 
P 860-633-8341 
 
 
 
 
October 13, 2026 
 
 
Mr. Mike Walsh 
Granby Town Manager 
15 North Granby Road 
Granby, CT 06035 
 
RE: Proposal for Integrated Design Services 
 Athletic Fields at The High School Complex 
 Granby, Connecticut 
 
Dear Mr. Walsh: 
 
Alfred Benesch & Company (Benesch) is pleased to submit this proposal to the Town of Granby, and specifically 
the Public Building and Capital Project Committee (PBCPC) for integrated design services in support of the 
renovation of the track and fields at the Granby Memorial High Schools at your property at 313 Salmon Brook 
Street, Granby, Connecticut.  This proposal has been prepared to present our proposed scope of services and 
associated fee in support of the project as your land use consultant and site/civil engineer. 
 
We have prepared this proposal based upon the following understanding of your needs and circumstances which 
have defined the scope of services. 
 
1.  Our base scope of services includes base mapping, geotechnical engineering, site/civil engineering, landscape 
architecture, land use permitting, and construction phase services.  The proposal has been segregated into 
two (2) main components, as requested: 
 
 Phase 1 – Investigation 
 Phase 2 – Design and Engineering 
 
2.  The town constructed the high school track and field in approximately 2013.  Around 2020, the track and field 
started experiencing local sinking/depressions.  The issue has become so extreme that no track meets are 
being held at the facility and if the existing sink holes on the field expand it is possible the field will be unusable 
for high school competition events.  In the last couple years, geotechnical subsurface exploration and analysis 
have been performed. 
 
3.  The proposed development includes the following: 
 
• The renovation of the high school track/field, as well as converting the existing stadium lights to LED. 
• The renovation of the synthetic turf practice field adjacent to the stadium field. 
The conversion of the grass baseball field to a synthetic turf baseball/softball/soccer multipurpose 
field. 
 
4.  Based on a review of Town GIS mapping, a 100-year floodplain is located on the northern portion of the 
property and does not appear to encroach into the areas proposed for development.  If any portion of the 

Page 10

Mike Walsh 
Page | 2 
 
project encroaches into the floodplain, the design will need to account for the local floodplain requirements. 
 
5.  Town GIS mapping indicates wetland existing along the northern portion of the property line.  The project will 
therefore require wetlands delineation and associated permitting through the Town Inland Wetlands 
Commission. 
 
6.  The CT DEEP Natural Diversity Database Area Map for Granby indicates that there may be State or Federal 
Listed Species or Significant Natural Communities on the Site.  A formal NDDB review by CT DEEP will be 
required by DEEP as part of their General Stormwater Construction Permit.  Archeological and/or Listed 
Species studies may be required by DEEP.  If required, these studies will be provided as an add service. 
 
7.  Based upon our site walk and associated discussion with the Town on October 2, 2026, we have thought about 
possible ways to bring value to this project, which may not have previously been considered by the PBCPC.  
We have briefly summarized them below and will discuss them in more detail with the PBCPC should we be 
selected to design this project. 
 
 Synthetic Turf Practice Field – there are not apparent sink holes/depressions or any known drainage 
issues with this field. Since this was constructed in approximately 2013, and it is functioning as 
designed, there is no reason to believe it needs a full replacement.  It may be prudent to simply replace 
the existing synthetic turf and infill and leave the aggregate base, drainage and concrete nailer curb 
in place.  Typically the infill needs to be replaced every seven (7) years or so, and the turf itself needs 
to be replaced every 14 to 15 years.  By replacing only the turf, and not the entirety of the field, this 
could save the town up to $1M. 
 Alternates – although not specified in the RFQ/RFP, it may be prudent to consider additional site items 
beyond the fields.  This will be a state-of-the-art high school athletic complex so the items below may 
want to be considered.  We have built an Add Services Scop and Fee into our proposal, which captures 
the design effort required to design these additional items.  These items could be bid as Alternates, 
and, at the very least, the utility infrastructure could be put in place to allow the future construction 
of these items without damaging the new fields.  If the funds are not available to construct some or 
all of these items, the design would be in place so that they could be constructed in the future.   
 
Following are alternate design items for consideration: 
 Connectivity of all the fields and the school. 
 Restrooms for the stadium field. 
 Restrooms for the baseball/softball/soccer field. 
 Lighting for the baseball/softball/soccer field. 
 Dugouts for the baseball/softball field. 
 Moveable fencing for baseball and softball to provide outfield fencing for each of these sports 
during games. 
We describe our approach to these items in detail in Section 2.6  - Alternate Design Approach and 
Scope of this proposal.  We have not provided a fee for this alternate design.  If the PBCPC wanted 
to pursue this alternate design, we could negotiate a scope and fee, based on PCBPC direction.  
Furthermore, at the end of this scope and fee, we have provided a sample design packet to help 
you understand our design process and the potential for community excitement and fundraising 
opportunities. 
 
  

Page 11

Mike Walsh 
Page | 3 
 
1.0 SCOPE OF SERVICES 
 
Benesch’s scope of services for the project has been segregated into the following phases: 
 
• Phase 1 – Investigation 
• Phase 2 – Design & Engineering 
 
Our scope of services for each of these phases is presented below. 
 
PHASE 1 – INVESTIGATION  
 
We have reviewed the previously performed geotechnical studies, as well as the subsurface exploration 
requirements that will be necessary for design and construction of both the track/field and the baseball field.  It 
is our opinion that the previous studies do not provide enough information for us to be comfortable designing a 
reconstruction.  Following are the reasons we feel the previous studies are not complete: 
 
• The existing borings don't have any density or consistency info (i.e. no SPT blow counts in the borings) 
which are typically used to determine the potential for consolidation of the sand and silt fill and natural 
materials encountered 
• 3 (HA-5, HA-6, and GP-22) of the 27 borings didn't get through the existing fill, to depth of 10 to 15 feet 
below existing grade, so depth of fill could be deeper at these locations which would impact the 
potential depth of remediation of unsuitable soils 
• With as much as 15'+ of existing fill (HA-6), additional depth of drilling into the natural soils, potentially 
through the glaciofluvial deposit, and sampling/testing would be needed to determine the condition of 
the underlying natural soils to determine potential future settlement if all existing fill was removed and 
replaced with controlled earth fill. 
Using GZA as our subconsultant, following is our project approach to geotechnical exploration, analysis and design 
for both the baseball field and the track/football field: 
 
Baseball Field Project Approach 
 
We understand that the existing baseball field has natural grass turf and will be converted to a synthetic turf field.  
We are not aware of any below-grade issues with the existing field.  Therefore, we will perform a series of test 
borings at the existing baseball field to evaluate the depth to native soil and the suitability to support the proposed 
structures.  GZA will also collect soil samples for laboratory testing to evaluate surface water infiltration. 
 
We propose to drill three days of test borings. In three days, we anticipate drilling 16 test borings with a track-
mounted drill rig using hollow stem augers: eight borings in the baseball field, four borings at proposed light poles, 
two borings at the proposed dugouts and two borings at the proposed restrooms. The borings in the field will be 
drilled to depths of 6 feet below grade or refusal. If loose soil, organics, or wood are encountered at 6 feet, the 
borings may extend deeper. If shallow refusal is encountered before target depth, an offset will be performed as 
time allows.  The test borings for the proposed structures will be drilled to depths of 15 to 20 feet below grade, 
or refusal.  
 
GZA personnel will log and monitor the subsurface explorations. Soil samples will be classified based on the 
Modified Burmister classification system. The field engineer will locate the explorations by line of sight and tape 

Page 12

Mike Walsh 
Page | 4 
 
measurements from existing site features. Surface elevations will be interpolated from existing topographic plans 
or publicly available topographic data. 
 
Selected soil samples will be submitted to a subcontracted geotechnical laboratory to confirm visual classification 
and provide engineering parameters for design. Testing will include six (6) sieve and hydrometer analysis. 
 
We will organize and interpret the subsurface data, perform geotechnical analyses, and prepare an electronic 
copy of the Geotechnical Engineering Report in PDF format. The engineering recommendations for design and 
construction presented in the report will be based on the current Connecticut Building Code (2021 International 
Building Code with the 2022 Connecticut State Amendments). Note, the Connecticut Building Code was scheduled 
to be revised to the 2024 IBC with amendments on July 1, 2026, but currently the new Code is awaiting approval 
by the Legislative Regulation Review Committee of the Connecticut General Assembly. Therefore, the effective 
date of the new Code has been delayed. The Geotechnical Engineering Report will include.  
 
• A subsurface exploration location plan and logs of explorations; 
• Narrative interpretation of the subsurface soil and groundwater conditions observed and their 
implications for the project; 
• Laboratory testing including grain size and hydrometer analyses; 
• Recommendations for shallow foundations, including bearing strata, ground improvement (if 
applicable), allowable bearing stresses, minimum embedment for frost protection, and estimated 
total and differential settlement, subgrade preparation, and any other geotechnical parameters that 
may be required for foundation design; 
• Recommendations for light pole foundations; 
• Recommended coefficient of friction between cast-in-place concrete and soil for resistance to lateral 
loads; 
• Recommendations for slabs-on-grade, including subgrade modulus and subgrade preparation; 
• Geotechnical seismic Site class and liquefaction potential based on the Building Code; 
• Recommendations for permanent groundwater control (underdrain or waterproofing), if applicable, 
• Recommendations for excavation slope stability, support-of-excavation (if required), and 
dewatering/temporary groundwater control during construction; 
• Recommendations for the new field, footing and slab subgrade preparations; 
• Recommended backfill materials; and 
• Recommendations for re-use of excavated materials. 
 
Track/Football Field Project Approach 
 
We understand that the existing track and synthetic turf field have settled and the worst settlement is occurring 
along the eastern side of the track.  Based on the “Subsurface Data and Geotechnical Considerations Report”’ 
dated November 8, 2022 and “Subsurface Conditions and Geotechnical Data Report”, dated July 28, 2025 by Haley 
and Aldrich (H&A), we understand that the current track was constructed between 2012 and 2013.  HA was 
engaged to evaluate the settlement and performed thirty-four (34) geoprobe explorations around the track.   
 
The subsurface explorations found a relatively thick layer of Fill which contained wood, topsoil and organic soil in 
the northeast corner of the track.  The subsurface explorations extended up to 15 feet below grade, and some 
explorations did not penetrate the Fill.  GZA assumes that the settlement in this area is likely caused by 
decomposition of the organic material in the Fill, very loose fill, or the migration of soil into void spaces between 
oversized material in the Fill such as cobbles, boulders, stumps, or logs.  The Geoprobe sampler used during the 
H&A explorations has a relatively small diameter, does not provide data regarding soil density, and does not 

Page 13

Mike Walsh 
Page | 5 
 
provide a representative sample of the Fill or the materials in the Fill which could be causing the settlement (i.e. 
stumps, logs, etc.). Therefore, GZA recommends two test pits along the east side of the Site to evaluate the Fill 
and whether deleterious materials are present.  We also propose test borings to evaluate the thickness of the Fill, 
density of the fill and depth to naturally deposited soil. The test borings will be completed both in the area of 
settlement (eastern side of track) and non-settled areas (western side) to help identify the cause of the settlement.  
 
We propose two days of test borings and one day of test pits at the existing turf field and track.  In two days, we 
anticipate drilling four test borings with a track-mounted drill rig using hollow stem augers and two test pits in the 
vicinity of observed settlement. The borings will be drilled to depths of 20 feet or to naturally deposited soil, 
whichever is deeper. If shallow refusal is encountered before target depth, an offset will be performed as time 
allows. Groundwater observations will be recorded on the exploration logs. 
 
Split-spoon sampling and Standard Penetration Testing (SPT) will be performed in general accordance with ASTM 
D-1586. Samples will be obtained semi-continuously. Groundwater depths will be measured in the borehole prior 
to backfilling. 
 
We will hire a synthetic turf contractor to remove and restore the turf at the test pit locations.  The test pits will 
be excavated up to 8 feet or refusal, whichever occurs first.  Test pits will be backfilled with spoils in compacted 
1-foot lifts. We assume turf subgrade will be restored to existing conditions by the synthetic turf contractor. 
 
GZA personnel will log and monitor the subsurface explorations. Soil samples will be classified based on the 
Modified Burmister classification system. The field engineer will locate the explorations by line of sight and tape 
measurements from existing site features. Surface elevations will be interpolated from existing topographic plans 
or publicly available topographic data. 
 
Selected soil samples will be submitted to a subcontracted geotechnical laboratory to confirm visual classification 
and provide engineering parameters for design. Testing will include six (6) sieve and hydrometer analysis. 
 
We will organize and interpret the subsurface data, perform geotechnical analyses, and prepare an electronic 
copy of the Geotechnical Engineering Report in PDF format. The Geotechnical Engineering Report will include.  
 
• A subsurface exploration location plan and logs of test borings; 
• Our narrative interpretation of the subsurface soil and groundwater conditions observed and their 
implications for the project including an evaluation of the track and field settlement identifying the 
likely cause of the failure. 
• Laboratory testing including grain size and hydrometer analyses; 
• Identification and analyses of key geotechnical issues associated with design and construction; 
• Recommendations for subgrade preparations; 
• Recommendations for drainage of the new track and field;  
• Recommendations for materials and compaction requirements; and 
• Recommendations for reuse of on-site materials. 
 
  

Page 14

Mike Walsh 
Page | 6 
 
PHASE 2 – DESIGN & ENGINEERING  
 
Task 2.1 – Base Mapping  
 
Task 2.1.1 – Wetlands Delineation 
 
Using our subconsultant, Martin Brogie, Inc. (MBI) will conduct field investigations to identify and delineate local 
and state defined resource areas.  Delineations will be performed within the project site in accordance with state 
methodology [Connecticut Inland Wetlands and Watercourses Act (Section 22a-36 to 22a-45 as amended, of the 
Connecticut General Statutes), and the Town of Granby, CT Inland Wetlands and Watercourses Regulations.] 
 
An Onsite Soil Investigation Report will be prepared.  The report will contain the following: 
 
• Wetland boundary delineation methodology. 
• Site description. 
• Wetland and upland soil description. 
 
Task 2.1.2 – Survey 
 
Benesch will prepare base mapping sufficient for design, permitting and construction.  We will prepare an A2 
boundary survey for the northeast corner of the site, where the baseball field is relatively close to the property 
line.  We will prepare T2 topography on the portions of the site that will be utilized for new construction.  Scope 
items in the phase include the following: 
 
• Research Town and State records for title information, existing mapping and easements. 
• The mapping and survey will be performed in accordance with the “Regulations of Connecticut State 
Agencies, Sections 20-300b-1 thru 20-300b-20”, and the “Minimum Standards for Surveys and Maps in 
the State of Connecticut” endorsed by the Connecticut Association of Land Surveyors, Inc. on September 
26, 1996. 
- The type of survey will be a “Boundary - Topographic Survey”.  
1.  Boundary and Horizontal control will conform to Class A-2 accuracy. 
2.  Vertical control will conform to Class V-2 accuracy. 
3.  Topographic and General Location Survey conform to Class T-2 accuracy. 
• Horizontal control will be recovered in Connecticut State Plane Coordinate system – North American 
Datum of  1983 (NAD ’83). Control will be established based on the best avilable Control Points recovered 
from State of Connecticut DOT or municipal sources.  Otherwise, control will be established using GPS 
survey procedures. 
• Vertical control will be Established in National Geodetic Vertical Datum of 1988. (NAVD ’88)  
• A sufficient amount of  horizontal and vertical control points with ties will be established in the project 
area for use during future construction projects. 
• All visible surface improvements will be field located and depicted on the plan. 
- Indicate encroachments and easements onto or off the property. 
- Indicate individual lot lines and lot block numbers; indicate street numbers if available. 
- Indicate location and dimensions of all existing structures on the subject lot. 
- Indicate names of owners of adjacent property. 
- Label surface materials, i.e. grass, bituminous, gravel etc. 

Page 15

Mike Walsh 
Page | 7 
 
- Complete topographic survey with contours at one (1) foot intervals and spot grades to the nearest 
tenth (0.1) of a foot within area indicated on the attached drawing(s). 
- The location of utility surface structures, along with paving and improvements aboveground and 
belowground. 
- The field survey will include obtaining top of frame elevations on utility structures as well as critical 
building structures. 
- Field survey of wetlands flags. 
 
Limit of Survey 
 
 
 
  

Page 16

Mike Walsh 
Page | 8 
 
Task 2.2 - Design 
 
Benesch will prepare a site design, which will be utilized for permitting and construction documents.   The design 
will generally consist of the following: 
 
• The renovation of the high school track/field, as well as converting the existing stadium lights to LED. 
• The renovation of the synthetic turf practice field adjacent the stadium field. 
The conversion of the grass baseball field to a synthetic turf baseball/softball/soccer field. 
 
We will perform the following scope items in this phase: 
 
• We will visit the site to observe existing conditions, verify design considerations and assess design layouts 
relative to existing conditions. 
• We will review the local zoning regulations and prepare a zoning analysis table that will be utilized for 
design and permitting. 
• Benesch will provide a site plan that considers your programming requirements, zoning requirements, site 
topography and stormwater management. 
• The design package will consist of the following: 
- Site Preparation and Erosion Control 
- Site Plan (materials, layout, landscaping) 
- Grading and Drainage  
- Details  
• After approval of the local land-use permits, we will advance the plans to construction document level. 
• We will prepare front end specifications and technical specifications. 
• We will coordinate with you and other members of your design team in an ongoing manner throughout 
the design process via telephone and e-mail to exchange general information, evolving design layouts, 
and other pertinent information. 
• Using a professional, 3 rd  party cost estimator, Pan American Consulting, we will provide a comprehensive 
construction cost estimate for both the schematic design-level documents, as well as the construction-
level documents. 
 
Task 2.3 - Permitting  
 
Task 2.3.1 - Inland Wetlands and Watercourse Permit 
 
As required by the Town of Granby Inland Wetlands and Watercourses Regulations, we will perform the following 
scope items for this permitting effort: 
 
• Preparation of the wetland’s application, as required by the Regulations, including the following: 
- Application Form 
- Alternatives Assessment 
- Abutters List 
- DEEP Reporting Form 
 
The Inland Wetlands Commission has the discretion of requiring additional information when the proposed 
work is considered a “significant impact.”  We have assumed the proposed work will not be considered a 
“significant impact” by the commission and we have therefore not included the additional information 
required by the regulations as part of our wetland permitting services.  Additional information may include, 
but not be limited to, the following: 

Page 17

Mike Walsh 
Page | 9 
 
 
- Development and implementation of a water quality testing program. 
- Comprehensive written environmental impact statement report. 
- Analysis of chemical or physical characteristics of fill material. 
- Maps and descriptions that identify downstream and downgradient regulated areas. 
- Engineering reports and analyses and additional drawings to fully describe the proposed activity. 
- Site specific, high intensity soils mapping. 
 
Task 2.3.2 – Site Plan Approval/Special Permit 
 
Our land-use permitting effort for the Site Plan Approval/Special Permit will include the following: 
 
• We will attend a pre-application meeting with Town staff to review the Permit Drawings and discuss the 
permitting process. 
• We will prepare a Stormwater Management Report as part of the permitting process to include: 
- Hydrologic analysis and computations to ensure proposed peak flows do not exceed those required 
by the Town’s regulations. 
- Hydraulic analysis and computations to ensure sizing of on-site stormwater facilities (manholes, catch 
basins, piping, etc.) is sized to meet Town requirements. 
- Water quality computations that conform to the Connecticut Stormwater Quality Manual. 
• We will prepare the required applications and associated reports, supplemental data, design narratives, 
etc. 
• We will be prepared to discuss any safety concerns the public may have during our public meetings. 
• We will prepare colored renderings, as required, of the proposed site for use in presenting the project to 
the Town Planning and Zoning Commission. 
 
Task 2.3.3 - Meetings and Response to Comments 
 
We will attend public meetings, as required by the permitting process, including but not limited to: 
 
• Informal town staff meetings. 
• Site walks. 
• Night meetings with commissions. 
 
As part of the permitting effort, we will provide follow-on services to respond to comments, requests for 
information, or requested design changes during the permitting process.  These services may consist of, but are 
not limited to, the following: 
 
• Telephone communications, letters/memorandums and/or e-mails. 
• Transmittal of supplemental information. 
• Revisions to the submitted reports or supplemental reports. 
• Plan revisions as a result of commission comments or conditions. 
• Preparation of easements. 
 
  

Page 18

Mike Walsh 
Page | 10 
 
Task 2.3.4 – CT DEEP General Stormwater Permit 
 
It is assumed the total disturbed project area will exceed five (5) acres.  Therefore, the Connecticut General Permit 
for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities (“General Permit”) 
will be required.  Following are items required by the permit, which we will prepare and submit: 
 
• NDDB Application (as required by the permit) 
• General Permit Registration 
• Stormwater Pollution Control Plan 
 
We have not included the cost of on-going erosion control inspections as required by the permit, as we assume 
your contractor will perform those. 
 
Task 2.4 - Bid Services 
 
We assume we will provide the town with our plans and technical specifications and the town will incorporate 
them into their front-end documents, and this will comprise the entire bid package.  Benesch will provide 
support to the project for site/civil and landscape elements during bidding, including the following: 
 
• Attendance at a Prebid walkthrough. 
• Response to Bid RFIs. 
• Issuance of Bid Addenda. 
• Review and compilation of bids. 
• Attendance at scope review meetings with the two (2) lowest qualified bidders. 
• Collaboration with the town and recommendation of bid award. 
 
Task 2.5 - Construction Phase Services 
 
Benesch will provide support to the project for site/civil and landscape elements during construction, including 
the following: 
 
• Review/processing of contractor submittals relative to our design scope for conformance to requirements 
of the Contract Documents. 
• Attendance at Owner-Architect-Contractor (OAC) meetings to discuss progress, schedule and any 
concerns.  We assume these will occur every other week. 
• Site visits to observe construction in progress and confirm that work relative to our design scope is 
proceeding in general conformance with the Contract Documents.  We have assumed weekly site visits in 
our fee. 
• We have included up to 40 hours for our geotechnical engineers to perform service during this phase.  It 
will be critical that they coordinate with the contractor during the excavation and earthwork phase of the 
project, in order to establish a stable base for the proposed improvements. 
• As needed/ongoing communications with the contractor by telephone and e-mail. 
• Respond to contractor requests for information (RFI). 
• Review of contractor Change Order Proposals. 
• Preparation of supplemental specifications, sketches, and design modifications to clarify intent or 
accommodate changes in the work. 
• Project close-out services, consisting of final site observations, punch list preparation, preparation of a 
certificate or substantial completion, and final acceptance of work. 

Page 19

Mike Walsh 
Page | 11 
 
 
Our fee for construction services is based upon the assumption of a construction timeline of up to 8 months.  We 
therefore assume 34 site visits and 17 OAC meetings. 
 
Task 2.6 – Alternate Design Approach and Scope  
At the Town’s direction and upon separate authorization, Benesch will develop alternate site improvements 
coordinated with the base athletic-field renovations. The work will evaluate pedestrian circulation between the 
school, athletic fields and tennis courts; accessible routes; spectator access; and interfaces with proposed grading, 
drainage, utilities and field safety clearances. Design may require additional survey and geotechnical exploration, 
and will identify improvements that may be constructed with the base project or implemented in subsequent 
phases. 
Alternate landscape architectural services may include the campus walking circuit, plazas,  woodland classroom, 
amphitheater seating, and a baseball–softball plaza incorporating concessions and batting cages. For the 
improvements selected by the Town, the agreed scope will establish the required layout, grading, paving, planting, 
site furnishings and associated details. Proposed locations and configurations will be evaluated against existing 
conditions, maintenance access, athletic operations, accessibility requirements and applicable land-use 
regulations. The design supplement illustrates preliminary concepts; final dimensions, materials and limits of work 
will be established through the authorized design process. 
Additional alternate improvements may include restrooms serving the stadium and baseball/softball/soccer field, 
lighting for the baseball/softball/soccer field, dugouts and moveable outfield fencing. Restroom design will be 
coordinated with a licensed architectural subconsultant and appropriate building-system engineers, considering 
prefabricated facilities where suitable and including applicable code requirements, utility availability, water and 
sanitary connections, and utility-provider coordination. Infrastructure associated with future improvements will 
be evaluated for installation during initial construction where practical, with the intent of limiting subsequent 
disturbance to completed athletic facilities. 
No fee for the alternate services described in this section is included in the base proposal. Before proceeding, 
Benesch and the Town will establish the selected improvements, design deliverables, consultant requirements, 
permitting responsibilities, schedule and associated fee through written authorization. That authorization will also 
define whether the improvements are to be incorporated as alternate bid items or documented for future 
construction, together with any required estimating, bidding and construction-phase services. The illustrative 
design supplement does not expand the authorized base scope or establish a commitment to construct all 
improvements shown.  
2.0 ADDITIONAL SERVICES AND FEES  
 
The following services are not included as a part of our scope of services.  These services may become necessary 
based upon the conclusions derived from the performance of the proposed services.  If required, these services 
will be performed for an additional fee in accordance with a change order. 
 
1.  Design of off-site roadway improvements are excluded. 
2.  Archeological and/or listed species studies, as may be required by DEEP, are not included.  We will not know 
if DEEP will require these until they perform their initial review of the site location. 
3.  Traffic services are excluded as it is our assumption that this project will not generate additional trip 
generation. 

Page 20

Mike Walsh 
Page | 12 
 
4.  Geotechnical Assumptions 
 Clear and unobstructed access to the exploration locations will be provided prior to mobilization, including 
removal of equipment, materials, or other obstructions, as necessary. 
 Field services will be performed during normal weekday working hours, generally between 7:00 a.m. and 
5:00 p.m.  Work required outside these hours, including evenings, weekends, or extended workdays, may 
result in additional fees. 
 Drilling equipment may remain at the Site during non-working hours for the duration of the exploration 
program.  We will coordinate with the owner for a location. 
 Test borings will be backfilled with drill spoils. Minor surficial disturbance is expected during the 
investigation including ruts and holes at the ground surface.  Matting will be used to minimize rutting. We 
have assumed only minimal repair will be required, including backfilling the explorations with spoils.  
Settlement at the subsurface exploration locations should be anticipated.  Excess spoils (if any) will be left 
on site. 
 The subcontractor fees do not include prevailing wage rates. 
3.0 SCHEDULE FOR SERVICES  
 
Benesch will work closely with your team to develop a project schedule based on project permitting requirements 
and your needs.  It is our understanding that you wish to engage a consultant in November after the referendum 
passes.  Assuming authorization to proceed in November, we anticipate it will require 6-8 months to survey, design 
and permit the project.  Typically, the local land use permitting is the most restrictive time component, especially 
since this project will require permits from both the Inland Wetlands Commission and the Planning & Zoning 
Commission.  We anticipate there will be public opposition due to public concern about the nature of synthetic 
turf and this could slow down the permitting process.  After receipt of both permits, the project typically requires 
up to four (4) to six (6) weeks to compile a formal bid package and then up to eight (8) weeks of bidding. 
 
4.0 FEES FOR SERVICES  
 
Benesch will perform the scope of services for Phase 1 for a lump sum for labor fee of $70,000  and Phase 2 for a 
lump sum for labor fee for $410,000   Direct expenses [plan reproduction, mileage, shipping, abutter mailings, 
public hearing sign costs, etc.] will be billed with no markup.  We suggest you budget $4,000 for direct expenses.  
The fee is segregated as follows: 
 
Phase 1 – Investigation     $70,000 
 
Phase 2 – Design & Engineering 
 
Base Fees 
         
Task 2.1 – Base Mapping $  30,000 
Task 2.2 - Design $240,000 
Task 2.3 - Permitting  $  40,000 
Task 2.4 – Bid Services  $  10,000 
Task 2.5 – Construction Phase Services $  90,000 
Total Lump Sum Fee $410,000  
Total Estimated Direct Expenses $    4,000 
 
  

Page 21

Mike Walsh 
Page | 13 
 
Alternate Fees 
         
Task 2.6 – Full Campus Design To be Negotiated, if desired by the PBCPC 
 
In the event that the fee for the scope of services defined herein will be exceeded due to changes in the scope of 
services, we will notify you to discuss and evaluate the work and related fees.  We will not exceed the authorized 
fees presented in this proposal without your authorization.  Changes in fees will be mutually revised by written 
amendment. 
 
If you have any questions about this information, please call or e-mail me at 860-494-4359 or 
wwalter@benesch.com .   We look forward to providing our services on this exciting project.    
 
Sincerely, 
Alfred Benesch & Company      
 
Will Walter, PE 
Senior Project Manager 

Page 22

GRANBY / DESIGN DISCUSSION 
Alternate Design Services 
Imagining a connected landscape. Cultivating a deeper sense of belonging. 
 
VICTORY PLAZA / What if this became the heart of school pride, gathering and everyday connection?  
 
Granby already holds all the natural ingredients of an unforgettable campus: a school at its core, fields alive with 
energy, quiet wooded edges, and a community that naturally comes together. What if these athletic updates are simply 
the spark that inspires us to link these pieces into one continuous home field? As stewards of the land, the landscape 
architects at Benesch help guide this vision—transforming functional field upgrades into a rich, cohesive campus worth 
coming back to. Research shows that high- performing green spaces can dramatically boost student well -being and 
academic outcomes —over a 20- year period, green campus investments can deliver net costs up to 381% lower  
compared to asphalt and gray infrastructure due to increased attendance, improved test scores, and energy savings. 
What if every path between destinations felt just as intentional as the games themselves, showing everyone in Granby 
how much our shared environment impacts daily success? 
 
Before the big games begin, what if we plant the idea of shaping this common ground as a shared playbook? Imagine 
if the connections between our daily spaces —the walk from classroom to kickoff, the shady spot where teammates 
regroup, the sidelines where parents catch up—were designed by the community’s own rhythm. Thoughtful paths, 
shade trees, seating, and outdoor hubs could organically stitch these moments together, creating an accessible 
foundation built to sustain both daily student life and future athletic achievements. 
 
Within this shared picture, what if each corner of campus reveals its own purpose? What if Victory Plaza welcomes 
both the high-energy excitement of Friday night lights and the quiet reflection of an ordinary afternoon? What if The 
Claw becomes the meeting point everyone naturally names, while The Den grows into an open- air classroom and 
event hub? From a comfortable baseball –softball plaza to a woodland Nature Classroom and seamless tennis links, 
warm brick, stone, timber, and planting can give these community-driven ideas a unified home character. 
What if the true measure of success isn't just what we build, but the everyday moments that take root here? Picture a 
teacher spontaneously moving a lesson outdoors, a grandparent finding a welcoming bench, students choosing to stay 
past the final bell, or  a neighbor taking a quiet evening walk. Strong visual storytelling and renderings don’t just look 
appealing—they help us rally support and visualize the victory together, making fundraising initiatives and campus 
improvements significantly more impactful. When a clear vision starts as a shared community seed, every future step 
naturally builds toward that common dream. 
 
As this idea grows from within Granby, each project becomes a natural extension of our collective spirit. By planting 
these 'what if' possibilities today, we invite the entire community to take ownership of the game plan. Build the home 
field around shared vision and belonging, and the lasting victories will always belong to the Granby community. 
 
BENESCH / GRANBY MEMORIAL HIGH SCHOOL 

Page 23

Page 24

Page 25

 
GRANBY / PLACES ALONG THE CAMPUS LOOP 
 
 
 
 
 
MEMORIAL STADIUM 
Baseball–Softball Plaza 
What if arrival at the upper fields felt like a natural 
homecoming? Brick paving, shaded seating, 
concessions, and batting cages invite players and 
families to gather and linger. Terraced seating opens up 
views for spectators and friends, seamlessly anchor ing 
the upper loop of our shared walking circuit. 
 
 
THE CLAW 
The campus meeting point 
What if a central junction organically transformed daily 
foot traffic into a vibrant social hub? Direct paths, low 
planting, and stone -and-timber benches keep 
movement effortless while offering a natural landmark to 
meet. Linked directly to the active fiel ds, The Claw 
becomes a natural center for student life. 
 
 
 
  
 
 
 
NATURE CLASSROOM 
Learning at the woodland edge 
What if learning naturally expanded into the surrounding 
woods? Along the quiet southwest edge, a simple 
seating circle creates space for outdoor lessons, group 
discussion, and personal discovery. It keeps quiet 
moments grounded in the larger rhythm of campus life. 
 
 
TENNIS CONNECTION 
Complete the campus circuit 
What if every corner of our athletic landscape felt 
effortlessly tied together? A welcoming pedestrian link 
brings the tennis courts into the core campus loop, 
complete with shade trees and restful pauses along the 
way, harmonizing daily traffic with pedestrian safety. 
 
 
 
 
 
 
 
 
 

Page 26

 
GRANBY / THE OPPORTUNITY AHEAD 
What if we imagine a campus worth coming back to… 
 
THE CAMPUS VISION / What if athletics, learning, landscape and community grew as one? 
The athletic renewal is an exciting opportunity in its own right, but what if we see it as a springboard for 
something deeper? What if this moment inspires us to elevate every place where students train, learn, 
and grow together? Studies demonstrate that v ibrant, nature-integrated schoolyards yield long-term 
educational and financial dividends. By pairing strong visualizations  with data-backed planning, we 
invite partners and donors to clearly see the winning play and join the team. 
What if this broader vision unfolds naturally from our shared values? A connected walking loop, 
welcoming plazas, outdoor learning spots, and native shade trees can weave our school and fields into 
a complete community landscape—giving athletes, students, families, and neighbors a space that feels 
uniquely their own. 
What if Granby brings this home-field vision to life step by step, cultivating ideas that feel entirely our 
own? Together, we can build an environment celebrated not just for its top-tier athletic facilities, but as 
an extraordinary place of belonging, community spirit, and shared pride. 
 
 
 
 
 
 

Page 27

  
 
10/13/2026 www.bscgroup.com 
Michael P. Walsh 
Town Manager 
Town of Granby 
15 N. Granby Road 
Granby, CT 06035 
 
RE: Granby Athletic Field Engineering Proposal 
Dear Mr. Walsh and members of the Public Building and Capital Project Committee, 
 
BSC Group, Inc. (BSC) is pleased to submit this proposal for engineering and design 
services related to investigation, engineering and design of athletic facility improvements at 
Granby Memorial High School located at 54 N. Granby Road. The proposed services shall 
include Phase 1 - Investigation and Phase 2 - Design and Engineering.  
 
Project Understanding 
The Town of Granby is considering comprehensive improvements to the athletic facilities at 
the Granby Memorial High School and Middle School campus. The anticipated program 
includes reconstruction of Stadium Field and the running track, replacement of the synthetic 
turf at Field Two, and conversion of the existing baseball field into a synthetic turf facility 
capable of supporting baseball, softball, and compatible overlay uses. 
The existing Stadium Field and track have experienced recurring settlement, depressions, 
and sinkholes associated with variable fill containing organic materials and buried wood. 
Previous investigations identified unsuitable materials at varying depths across the facility, 
including deeper fill near portions of the track. The Town has received a proposed post-
tensioned concrete solution intended to span the unsuitable soils. Full excavation and 
replacement, ground improvement, structural bridging, and hybrid approaches may also be 
technically feasible. 
BSC will serve as the Town’s independent engineering advisor. Our work will confirm the 
project program, evaluate the subsurface conditions, compare viable improvement strategies, 
establish realistic project costs and schedules, and advance the Town’s selected solution 
through design, permitting, bidding, and construction. 
 
SCOPE OF SERVICES 
 
Phase 1 – Investigation, Alternative Evaluation, and Project Definition 
 
Task 1.1 – Project Initiation and Program Confirmation 
 
• BSC will initiate the project with a kickoff meeting involving the Town, Board of Education, 
Public Building and Capital Project Committee, school facilities staff, athletic 
representatives, and other identified stakeholders. The purpose of the meeting will be to 
confirm the Town’s objectives, establish decision-making and communication protocols, 

Page 28

  
 
review the available project budget, and define the improvements to be included in the 
base project. 
• The discussion will address Stadium Field and the running track, Field Two, and the 
baseball/softball facility, as well as related needs such as drainage, utilities, lighting, 
accessibility, bathrooms, storage, bleachers, press facilities, and athletic equipment. BSC 
will work with the Town to distinguish required improvements from discretionary 
enhancements or bid alternates. Athletic seasons, school activities, construction access, 
and acceptable facility downtime will also be considered when establishing the preliminary 
project schedule. 
BSC and its subconsultants will review the available design, construction, maintenance, and 
investigation records associated with the athletic complex. We will review available project 
information, including: 
 
o Original 2012–2013 design and construction documents. 
o Record drawings, shop drawings, submittals, change orders, testing reports, 
and closeout documents. 
o Previous geotechnical investigations and recommendations. 
o Available survey, utility, drainage, and campus mapping. 
o FieldTurf and other vendor concepts, proposals, budgets, and warranties. 
o Athletic facility master-planning documents. 
o Prior repair and maintenance records. 
o Stormwater and drainage information. 
o Existing permits and regulatory approvals. 
o Capital-program budgets and CPPAC materials. 
o Applicable Town, school, CIAC, NFHS, accessibility, and building-code 
requirements. 
 
The review will focus on understanding the original construction, the progression of the 
settlement and sinkhole conditions, the effectiveness of prior repairs, and the assumptions 
supporting the currently proposed improvements. BSC will identify discrepancies, missing 
information, and issues that require confirmation through field investigation or additional 
testing. 
 
Task 1.2 – Existing Conditions Survey and Base Mapping 
 
• BSC will review available survey information and perform supplemental survey as needed 
to establish a coordinated base map for the project. The survey will document the athletic 
fields, track, pavement, walkways, fencing, bleachers, buildings, lighting, drainage 
structures, utilities, accessible routes, and other features that may affect design or 
construction. Surface elevations will be collected to document existing grading and 
observable areas of settlement. 
• BSC will prepare an Existing Conditions Plan under the direction of a Connecticut- 
licensed Land Surveyor.  The Existing Conditions Plan will depict the Site boundaries, 

Page 29

  
 
locations of site improvements, utilities, and topography.  We will generate a triangulated 
irregular network (TIN) for the surveyed area and depict contour lines at a Site-
appropriate interval (1 or 2 feet) with spot elevations at surface structures and in other 
areas as may be appropriate. Final prints will bear the signature and seal of a 
Connecticut-licensed Land Surveyor.  We will provide the completed Existing Conditions 
Plan to you in both print and digital (Portable Document Format; .pdf).  
• BSC will delineate the boundaries of jurisdictional wetlands and watercourses on the Site.  
Delineation will be conducted by a soil/wetland scientist who meets the definition of a “Soil 
Scientist” in accordance with Connecticut General Statutes Title 22a, Chapter 440, Inland 
Wetlands and Watercourses Act. The Soil Scientist will delineate the boundaries of inland 
wetland areas with sequentially numbered flagging tape placed at regular intervals. To 
document the wetlands delineation work, a letter report will be prepared which 
summarizes the field work and results. 
• BSC will conduct a field assessment of Stadium Field, the running track, Field Two, and 
the baseball/softball area. The assessment will document the condition of the turf, track 
surfacing, pavement, drainage, fencing, backstops, ball-control netting, gates, athletic 
equipment, lighting, electrical service, spectator areas, and accessible circulation. Existing 
water, irrigation, and stormwater infrastructure will be reviewed to the extent that it is 
visible or documented. 
• The assessment will identify facilities that may remain in service, elements requiring 
modification, and components that should be replaced. BSC will also evaluate emergency 
access, maintenance access, construction staging, material-storage areas, and other site 
constraints that may influence project cost and implementation. 
 
Task 1.3 – Supplemental Geotechnical Investigation and Analysis 
 
• BSC’s geotechnical subconsultant (Down to Earth Consulting, LLC) will review the 
existing 2022 and 2025 exploration programs and determine whether the available 
information is sufficient to evaluate the potential ground-support alternatives. Where data 
gaps remain, the geotechnical engineer will prepare and implement a targeted 
supplemental investigation program. 
• The targeted supplemental investigation includes additional explorations within Stadium 
Field and the running track where existing data require clarification. Investigations will also 
be performed at Field Two and the baseball/softball field to determine whether similar 
variable fill or unsuitable materials are present beneath those facilities. We have included 
three days of geotechnical borings. 
• The boring program will include borings, Standard Penetration Tests (SPT) semi-
continuously up to ten feet and at five-foot intervals thereafter, groundwater observations, 
and laboratory testing. If explorations reveal that the subsurface soils are compressible, 
additional explorations and laboratory testing may be required for foundation design. 
• We propose completing engineering index testing consisting of up to three Atterburg 
Limits Tests and up to five Water Content Tests. We will correlate the proposed laboratory 
testing results with published subsurface data to support our geotechnical analysis.  
• The investigation will result in a geotechnical report documenting the subsurface 
conditions, relevant design parameters, preliminary settlement analyses, and 
recommendations for the improvement alternatives carried forward for evaluation. 

Page 30

  
 
• BSC and its geotechnical subconsultant will initially screen the potential support strategies 
based on the available subsurface information, site constraints, anticipated performance 
and order-of-magnitude cost. Alternatives that do not demonstrate reasonable technical or 
economic viability will be documented and eliminated from further consideration. The 
detailed comparison will focus on the limited number of solutions that warrant serious 
consideration by the Town. 
• The evaluation will include the proposed post-tensioned concrete track and field system, 
as well as full excavation and replacement of unsuitable materials. Other methods such 
as rigid inclusions, controlled-modulus columns, lightweight fill, or hybrid systems will be 
considered where the subsurface conditions and anticipated facility loading support their 
use. 
• Each viable alternative will be evaluated for its ability to control total and differential 
settlement and its compatibility with the running track, synthetic turf, drainage systems, 
utilities, lighting, fencing, walkways, and other site improvements. The analysis will also 
consider construction cost, schedule, athletic downtime, excavation and disposal 
requirements, groundwater impacts, specialty-contractor availability, testing and quality-
control requirements, warranty coverage, expected service life, future resurfacing and turf 
replacement, repairability, and lifecycle cost. 
 
Task 1.4 – Athletic Complex Concept Development 
 
• BSC will prepare concept-level plans illustrating how the athletic complex could be 
reconstructed using the viable ground-support strategies. The concept plans will 
coordinate the improvements to Stadium Field and the running track, Field Two, and the 
baseball/softball facility as one campus system. 
• The concepts will address facility layout, grading, stormwater management, subsurface 
drainage, utility routing, accessible circulation, maintenance access, emergency access, 
fencing, gates, backstops, ball-control netting, lighting, scoreboards, and athletic 
equipment. Where applicable, the plans will also identify potential locations or 
accommodations for bathrooms, concessions, storage, bleachers, and press facilities. 
• Attention will be given to shared infrastructure and opportunities to reduce costs or avoid 
future conflicts. BSC will also consider construction access, material storage, phasing, 
and methods for minimizing disruption to school and athletic activities. 
• BSC will prepare a conceptual owner’s cost estimate for each viable project alternative. 
The estimate will include the anticipated site and athletic-facility construction, ground 
improvement or structural support, drainage and utility improvements, contractor 
mobilization and general conditions, testing and inspection, escalation, and appropriate 
design and construction contingencies. The estimate will reconcile the project scope 
against the previous vendor budgets and identify exclusions, allowances, or unresolved 
conditions that could create additional cost exposure for the Town. BSC will separately 
identify discretionary improvements and potential bid alternates so that the Town can 
establish a base project that remains aligned with the bond authorization. 
• BSC will update the preliminary schedule addressing investigation, design, permitting, 
bidding, construction, long-lead materials, and seasonal limitations. 

Page 31

  
 
• We will submit a draft version of the completed Conceptual Design package to the Town 
for review.  Based on feedback received, we will revise/update the design package 
accordingly as part of Phase 2 (see below). 
• In addition to the kick-off meeting, BSC will attend two (2) meetings with the Town and 
stakeholders during Conceptual Design to review the design documents. Our scope of 
services assumes that these meetings will be “virtual meetings” using BSC’s Teams 
platform or similar technology. 
 
Task 1.5 – Phase 1 Recommendations and Decision Workshop 
 
• BSC will organize the findings into an alternatives matrix comparing the viable solutions 
against evaluation criteria established with the Town. The criteria are anticipated to 
include settlement performance, initial cost, lifecycle cost, schedule, facility downtime, 
constructability, maintainability, warranty coverage, environmental impacts, and overall 
owner risk. 
• BSC will conduct a decision workshop with the Town and school representatives to review 
the findings, discuss the tradeoffs among the alternatives, and develop a recommended 
project approach. The recommendation will identify the proposed base project, suggested 
bid alternates, preliminary budget, anticipated schedule, permitting requirements, and 
remaining design risks. 
• The findings and recommendations will be documented in a Phase 1 report and presented 
to the designated Town committee, Board of Education, and other public bodies as 
requested. Phase 2 will proceed following the Town’s acceptance of the Phase 1 
recommendation and written authorization to advance the selected alternative. 
 
Phase 1 Deliverables 
 
Phase 1 will result in a coordinated existing-conditions base map, facility-condition 
assessment, supplemental geotechnical report, concept-level athletic complex plans, ground-
improvement alternatives analysis, permitting matrix, conceptual cost estimate, preliminary 
project schedule, and investigation and recommendations report. BSC will also prepare the 
graphics and presentation materials needed to communicate the recommendations to the 
Town. 
 
Phase 2 – Design, Engineering, Permitting, and Construction Services 
 
Task 2.1 – Design Development 
 
• Following authorization by the Town, BSC will advance the selected concept to 
approximately 30 percent design. The design-development package will establish the 
proposed demolition limits, athletic-facility layout, track geometry, field elevations, grading, 
drainage, utilities, accessible routes, fencing, gates, netting, lighting improvements, 
athletic equipment, and preliminary construction phasing. 
• The geotechnical design for the selected ground-support system will be advanced 
sufficiently to confirm the proposed design criteria, construction limits, anticipated 
specialty work, and testing requirements. BSC will also establish the performance 

Page 32

  
 
requirements for the synthetic turf and running-track systems and identify proposed bid 
alternates. 
• Design Meetings - We will attend one (1) meeting with the Town and stakeholders during 
this task. Our scope of services assumes that these meetings will be “virtual meetings” 
using BSC’s Teams platform or similar technology. 
 
Task 2.2 – 60% Construction Documents 
 
Upon acceptance of the design-development package, BSC will prepare coordinated 60 
percent construction documents. Utilizing comments received from the Design Development 
review meeting, BSC will prepare 60% construction document drawings. We will develop the 
following drawings: 
 
o Cover Sheet 
o Existing Conditions Plan 
o Site Preparation and Demolition Plan 
o Materials Plans 
o Layout Plans 
o Sports Field Layout Plans 
o Grading and Drainage Plans 
o Utility Plans 
o Details 
 
• BSC will update the Opinion of Probable Construction Cost based on the 60% 
Construction Document drawings.  
• BSC will prepare a Stormwater Management Report to document the evaluations, 
stormwater management requirements, and engineering design of the stormwater 
conveyance and management systems for the projects.  The report will be prepared in 
accordance with Town and State standards, and will discuss existing conditions, 
hydrology, definition of needs, the design of proposed stormwater management facilities, 
and operations and maintenance of proposed stormwater management facilities. 
• We will submit a draft version of the completed 60% Construction Documents package to 
the Town for review.  Based on feedback received, we will revise/update the design 
package accordingly in the next task. 
• Design Meetings - We will attend one (1) meeting with the Town and stakeholders during 
this task. Our scope of services assumes that these meetings will be “virtual meetings” 
using BSC’s Teams platform or similar technology. 
 
Task 2.3 – 90% Construction Documents 
 
• BSC will incorporate the Town’s consolidated review comments and advance the plans 
and specifications to approximately 90 percent completion. At this stage, the design team 
will resolve remaining technical and interdisciplinary coordination issues, finalize 
construction details, confirm permitting requirements, and refine the bid alternates, 
allowances, testing requirements, and warranty provisions. 

Page 33

  
 
• BSC will update the Opinion of Probable Construction Cost based on the 60% 
Construction Document drawings.  
• We will submit a draft version of the completed 90% Construction Documents package to 
the Town for review.  Based on feedback received, we will revise/update the design 
package accordingly in the next task. 
• Design Meetings - We will attend one (1) meeting with the Town and stakeholders during 
this task. Our scope of services assumes that these meetings will be “virtual meetings” 
using BSC’s Teams platform or similar technology. Following the meeting, BSC will 
prepare a written response describing how the consolidated comments will be addressed 
in the final documents. 
 
Task 2.4 – Permitting 
 
BSC will prepare the permit applications and supporting materials and will coordinate 
submissions with the applicable local and State agencies. Based on our project 
understanding, we anticipate the project will require the following: 
 
• BSC will attend a pre-application development team meeting with Town staff to discuss 
the permitting process. 
• We will prepare a Town of Granby Application to Appear Before the Granby Planning and 
Zoning Commission for Site Plan review along with the required supporting materials. We 
will submit the application package to the Town to be put on the agenda for the 
appropriate Planning and Zoning Commission meeting.  
• We will attend up to a total of (2) meetings to present the project and answer technical 
questions regarding the design before the Planning and Zoning Commission. 
• BSC will prepare an Inland Wetlands and Watercourses Commission Application for 
Inland Wetlands and Watercourses Activity along with the required supporting materials.  
• We will submit the application package to the Town to be put on the agenda for the 
appropriate Inland Wetland and Watercourses Commission meeting. 
• We will attend up to a total of (2) meetings to present the project and answer technical 
questions regarding the design before the Inland Wetlands and Watercourses 
Commission. 
• Based on the review of the anticipated project site, we assume disturbance will be greater 
than 1 acre and less than 5 acres and will be locally approved, therefore, will need to be 
registered under CT DEEP General Permit for the Discharge of Stormwater and 
Dewatering Wastewaters from Construction Activities (DEEP-WPED-GP-015). BSC will 
prepare and register the project.   
• Following the Town’s submissions and meetings, BSC will provide follow-on services to 
respond to comments, requests for information, conditions of approval, or requested 
design changes during the permitting process. Our Lump Sum fee includes minor plan 
revisions for purposes of clarification, telephone discussions, and basic e-mail 
communications.  Extensive plan revisions, design changes, re-printing of documents, site 
visits, meetings, and appeals are not included in our lump sum fee and will be performed 
as an additional service. 
  

Page 34

  
 
Task 2.5 – Final Construction and Bid Documents 
 
• Using the Town approved 90% construction document drawings, BSC will prepare final 
technical specifications and design drawings (100% Construction Documents). The 
drawings will include additional information, notes and details as necessary to clearly 
define the scope of site work to be completed by prospective contractors. 
• BSC will prepare technical specifications for the project to supplement the design 
information indicated on the drawings.  Technical specifications will be prepared using 
Construction Specifications Institute (CSI) MasterFormatTM 2020 Edition Numbers and 
Titles.  
• BSC will work with your finance department and provide technical information to be used 
for soliciting bids. Bid Documents will include the following: 
o Drawings: “Issued for Bid” drawings. 
o Project Manual 
o Bidding Materials (Coordinated with the town). 
o Agreement and General Conditions. 
o Supplementary conditions. 
o Division 1 General Requirements. 
o Technical Specifications. 
• Meetings – We will attend one meeting with the town to review and coordinate the bidding 
documents. Our scope of services assumes that these meetings will be “virtual meetings” 
using BSC’s Teams platform or similar technology.  
 
Task 2.6 – Bidding Assistance 
 
BSC will provide the following bidding assistance services: 
 
• BSC will coordinate and host a pre-bid meeting at the project site so potential bidders can 
view the project area. 
• BSC will prepare bid addenda and responses to bid questions as may be required during 
bidding for the purposes of clarification or interpretations of the Bidding Documents. 
• Once bids are received, BSC will assist the Town in evaluating bids and make a 
recommendation regarding award.  This will include evaluation of the bids, verification of 
bid items, evaluation of bidder qualifications, and reference checks. We will prepare and 
submit a Bid Recommendation Letter to the Town documenting our review of the bids and 
recommendation for award to the lowest qualified bidders. 
• BSC will coordinate and host a scope review with the Town and apparent low bidder to 1) 
verify that their bid includes all required elements of the project, 2) confirm their 
understanding of the scope of the work, and 3) confirm the post-bid requirements for 
executing an agreement (bonds, insurance, etc.). 
• Following the bidding period BSC will prepare a set of Construction Documents/Contract 
Documents incorporating the Bid Documents, Addenda, supplemental drawings, 
clarifications, executed contract, and other additional information developed during the 
bidding period.  These materials will be marked “Issued for Construction”. 

Page 35

  
 
 
Task 2.7 – Construction Phase Services 
 
BSC will provide the following construction phase services: 
 
• BSC will attend a pre-construction conference (construction kick-off meeting) with the 
Town and the contractor/subcontractor(s).  
• BSC will provide technical feedback to the contractor during the mobilization process.  It is 
assumed that this will be completed by telephone and e-mail.  
• Submittals/Shop Drawings. BSC will review/process technical submittals/shop drawings 
required by the plans and specifications. This will also include material/product 
substitution requests. 
• Requests for Information. BSC will prepare narrative responses, supplemental 
specifications, and narrative design clarifications in response to Requests for Information 
(RFIs) by the contractor. 
• Design Services During Construction. BSC will provide design services during 
construction on an as-needed basis.  The design services could include supplemental 
drawings or design changes/plan changes and will be conducted on an hourly basis. 
• BSC will conduct periodic site visits at a nominal rate of one (1) per week to 
observe/document construction in progress and confirm that work observed is proceeding 
in general conformance with the Contract Documents. Depending on the work being 
performed, additional visits may be conducted. We have assumed twelve (12) months for 
the construction phase, excluding winter shut down, with a total of thirty (30) visits. A Field 
Observation Report will be prepared for each site visit. 
• BSC will maintain periodic telephone and/or e-mail contact with the contractor throughout 
the project for coordination purposes. 
• BSC will facilitate weekly construction progress meetings for the duration of construction. 
We will work with the Town to prepare a standardized agenda for these meetings.  For 
each meeting, BSC will prepare and distribute summary meeting minutes using a 
standard format. These meeting could be either be on site of virtual.  
• BSC will evaluate contractor change order proposals.  
• BSC will review monthly contractor Applications for Payment and advise the Town if the 
requested payment is commensurate with the completed work. 
• BSC will conduct one (1) initial close-out inspection of the work and prepare a Punch List. 
• BSC will review as-built drawings, O&M manuals, warranties, and certifications applicable 
to the work. 
• BSC will prepare a Certificate of Substantial Completion or similar document to confirm 
that the contractor has achieved substantial completion. 
• BSC will conduct one (1) final close-out inspection to observe final work and items that 
were addressed as part of the punch list process. 
• BSC will prepare a Certificate of Final Acceptance or similar document at the completion 
of the project. 
• Additional site visits specific to closeout will be conducted on an as-need/as-requested 
basis, on an hourly basis. 

Page 36

  
 
 
2.0   ADDITIONAL SERVICES 
 
The following services are not included as a part of this Proposal. These services may 
become necessary based upon the conclusions derived from the performance of the 
proposed scope above. If required, these services will be performed for an additional fee to 
be paid on an hourly basis in accordance with the attached BSC Fee Schedule. 
 
• Activities related to the collection, handling, or treatment of hazardous materials. 
• Plan implementation and routine inspections associated with the Connecticut DEEP 
General Permit for the Discharge of Stormwater and Dewatering Wastewaters from 
Construction Activities.   
• Retaining wall design and any associated structural calculations, if required. 
• Participation in meetings, hearings, and coordination beyond the estimates provided 
above. 
• Major revisions of previously approved drawings or specifications to accomplish changes 
requested by the Client or Owner. 
• Providing services required because of significant changes in the project including, but not 
limited to size, quality, complexity, the Client’s schedule, or the method of bidding or 
negotiating and contracting for construction. 
• Off-site flow analysis for stormwater drainage. It is assumed that the existing system has 
sufficient capacity to meet the needs of the project. 
• Providing additional plan set submissions. 
• Reproduction services of any kind. 
• Clerk of the Works or Resident Engineer services. 
 
3.0   SCHEDULE FOR SERVICES 
 
BSC proposes to begin the services identified in Section 1.0 of this Proposal upon receipt of 
written authorization to proceed. Our proposed schedule for the completion of the task(s) 
described in Section 1.0 of this Proposal. 
  
4.0   FEE FOR SERVICES 
 
4.1 BSC proposes to provide the services described in Section 1 of this Proposal for the 
lump sum fee of $ Three Hundred Fifteen Thousand Four Hundred Twenty 
($315,420) Dollars including all direct expenses. Periodic billing shall be based upon 
percentage of work completed. 
 
4.2 Fees shall be billed monthly as applicable. Payment is due upon receipt of invoices. 
Failure to comply with the payment terms of this Proposal shall be cause for the 
Consultant to terminate services.  
 
4.3 The Client shall provide BSC with any specific billing format required for prompt 
payment of invoices. The mailing address for all payments is: 

Page 37

  
 
 BSC Group, Inc. 
 1 Mercantile St. Suite 610 
 Worcester, MA 01608 
 
4.4 The following is a breakdown of the estimated fee described in Section 1.0 of this 
Proposal. The budget for individual tasks shall not be construed to be separate limiting 
fees. 
Phase 1 – Investigation, Alternative Evaluation, and Project Definition 
Task 1.1 – Project Initiation and Program 
Confirmation 
$5,544 
Task 1.2 – Existing Conditions Survey and 
Base Mapping 
$24,540 
Task 1.3 – Supplemental Geotechnical 
Investigation and Analysis 
$33,652 
Task 1.4 – Athletic Complex Concept 
Development 
$19,780 
Task 1.5 – Phase 1 Recommendations and 
Decision Workshop 
$10,805 
Phase 2 – Design, Engineering, Permitting, and Construction Services 
Task 2.1 – Design Development $42,354 
Task 2.2 – 60% Construction Documents $34,684 
Task 2.3 – 90% Construction Documents $24,644 
Task 2.4 – Permitting $16,157 
Task 2.5 – Final Construction and Bid 
Documents 
$19,680 
Task 2.6 – Bidding Assistance $4,815 
Task 2.7 – Construction Phase Services $78,765 
Total: $315,420 
 
 
5.0   GENERAL CONSIDERATIONS 
 
5.1 This proposal is valid for a period of thirty (30) days. 
 
  

Page 38

  
 
BSC welcomes the opportunity to provide professional services for this project. If you should 
have any questions or require additional information, please contact me at 
jharris@bscgroup.com or 860-652-8227. 
 
Sincerely, 
 
BSC Group, Inc. 
 
Jesse A. Harris, Project Manager 
 
Attachment(s):  Project Schedule 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Page 39

2026
Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
1.1 Project Initiation and Program Confirmation
1.2 Existing Conditions Survey and Base Map
1.3 Supplemental Geotechnical Investigation and Analysis
1.4 Athletic Complex Concept Development
1.5 Phase 1 Recommendations
2.1 Design Development
2.2 60% Construction Documents
2.3 90% Construction Documents
2.4 Permitting
2.5 Final Construction and Bid Documents
2.6 Bidding Assistance
2.7 Construction Phase Services
M Phase 1 recommendation M
M Final bid documents M
M Bidding complete M
M Construction services begin M
M Anticipated completion M
* Permitting duration does not include a public hearing. Schedule durations exclude weekends and holidays.
Feb 5, 2027
Aug 6, 2027
Sep 10, 2027
Oct 1, 2027
Oct 1, 2028
Apr 26–Jul 16, 2027*
Jul 19–Aug 6, 2027
Aug 9–Sep 10, 2027
Oct 1, 2027–Oct 1, 2028
KEY MILESTONES
Jan 25–Feb 5, 2027
PHASE 2  DESIGN ENGINEERING PERMITTING AND CONSTRUCTION SERVICES
Feb 8–Mar 5, 2027
Mar 8–Apr 2, 2027
Apr 5–23, 2027
PHASE 1  INVESTIGATION ALTERNATIVES EVALUATION AND PROJECT DEFINITION
Dec 14–18, 2026
Dec 14–31, 2026
Dec 28, 2026–Jan 15, 2027
Jan 4–22, 2027
Granby Memorial High School Athletic Facilities
Preliminary project schedule | December 2026 through October 2028
COLOR KEY   Blue  Phase 1     Green  Design     Gold  Permitting     Light Blue  Bidding     Gray  Construction support
2027 2028
TASK ACTIVITY SCHEDULE

Page 40

SLR International Corporation 
 
99 Realty Drive, Cheshire, Connecticut, 06410 
 
 1  
 
October 13, 2026 
Mr. Mike Walsh 
Town Manager 
Town of Granby 
15 North Granby Road 
Granby, CT  06035 
SLR Project No.: 141.P51644.00001 
SLR Client No.:  12712 
RE: Investigation and Design Services for Athletic Field Improvements 
Stadium Field, Track, Field Two, and Baseball Field at the  
Granby Memorial High School Complex 
Granby, Connecticut 
Dear Mr. Walsh, 
SLR International Corporation (SLR) is pleased to submit this narrative describing our approach 
to assisting the Town of Granby (Town) with the evaluation, design, and renovation of the 
outdoor athletic facilities at Granby Memorial High School located at 313 Salmon Brook Street. 
As requested, this narrative is organized into two distinct phases, each outlining the proposed 
scope of services and associated fees. 
Phase 1 will focus on the investigations necessary to evaluate existing site conditions and 
establish a basis for design for the Stadium Track and Field. These services include determining 
the root causes of deficiencies within the Stadium Field and Running Track; completing 
topographic surveys for the three project areas; delineating wetland and watercourse boundaries 
in the vicinity of each site; conducting limited, minimally invasive testing of the existing synthetic 
turf systems to assess their suitability for reuse and to inform anticipated removal, disposal, and 
recycling costs; and excavating a series of shallow test pits within the baseball/multipurpose field 
to quantify topsoil management requirements and evaluate existing subsurface drainage 
characteristics. 
Phase 2 will consist of the development of detailed engineering and construction documents for 
the proposed improvements. This phase includes preparation of permit applications and 
presentations required for review by local land use commissions, development of technical 
specifications, and preparation of opinion of probable construction cost estimates.  
Upon completion of both phases, the Town will possess the information, approvals, and 
construction documents necessary to advance one or more of the proposed improvement 
projects through the public bidding process and into implementation. 

Page 41

Town of Granby 
Investigation and Design Services for Athletic Field Improvements 
 
October 13, 2026 
SLR Project No.: 141.P51644.00001 
 
 2  
 
Overall Project Approach 
 
Phase 1 Investigation – Stadium Track and Field  
Our team believes there is value in stepping back from the options currently being discussed for 
the Memorial High School stadium, including full soil removal across the track and field and 
construction of a full post-tensioned concrete slab. While soil borings are a valuable resource for 
any site improvement project, they can be limited in depicting the full range of conditions, 
particularly in a built environment that has been altered several times over multiple decades with 
limited records. The Town is currently experiencing localized subsurface instability, manifested 
as sinkholes, within a confined area of the synthetic turf field and track, with only speculation as 
to what the future may hold for currently unaffected areas. 
As our in-house geotechnical, civil, and structural engineers reviewed the available soil 
investigations with our landscape architects, we identified several items that led us to question 
whether full soil removal is warranted and whether additional geotechnical data could help 
reduce the stadium reconstruction costs or allow for reallocation of funding to include additional 
facility amenities. 
Our review of the 2022 geoprobe soil logs indicated a fairly consistent difference in fill conditions 
across the stadium, primarily as the probes moved from east to west. On the west side of the 
stadium, the logs generally indicate track or field construction materials placed over native soils. 
On the east side, the improvements appear to have been constructed over varying depths of fill. 
A pocket of fill was also noted on the west side at GP-22, as shown in the graphic below. These 
differences suggest that full soil removal across the site may not be warranted. They are also 
consistent with the issues occurring along the east side of the field and track interface. 

Page 42

Town of Granby 
Investigation and Design Services for Athletic Field Improvements 
 
October 13, 2026 
SLR Project No.: 141.P51644.00001 
 
 3  
 
 
Granby High School stadium 2022 Geoprobe location map with general fill conditions noted. 
Note the approximate 50/50 split of areas of fill (east side) versus native subsoils (west side). 
 

Page 43

Town of Granby 
Investigation and Design Services for Athletic Field Improvements 
 
October 13, 2026 
SLR Project No.: 141.P51644.00001 
 
 4  
 
Our team proposes focusing the investigative phase of the stadium project on an evidence-
based program to determine the true boundaries of the soil deficiency to minimize 
reconstruction efforts and potentially allow for the inclusion of additional amenities, including a 
restroom building, lighting, or scoreboards.  
To maximize the value of the investigation, we propose using continuous imaging and linear 
excavation techniques rather than the standard “spot” investigations associated with traditional 
borings or isolated test pits. As the previous geoprobe program showed, subsurface conditions 
can vary significantly between the limited footprints of individual boring locations. To establish a 
continuous profile of existing soil conditions without the prohibitive cost of widespread exploratory 
drilling, we propose a combination of the following linear and spatial investigation techniques: 
• Electrical Resistivity Imaging (ERI): This nondestructive method measures variations 
in subsurface electrical resistance to generate continuous cross-sectional profiles of the 
field’s underlying strata. The ERI system injects a direct electrical current into the ground 
through a linear array of steel electrodes and measures the resulting voltage differences. 
Specialized inversion software then processes the data to generate two-dimensional or 
three-dimensional subsurface profiles. At a site with heterogeneous fill and sinkholes, 
anomalies can appear as distinct contrasts in resistivity. Air pockets, saturated soils, and 
highly variable materials—including construction debris, mixed soils, and trash—may be 
visible. 
• Drone-Derived Photogrammetry and Topographic Mapping: High-resolution aerial 
drone surveys can capture microtopographic variations and subtle surface expressions. 
Monitoring these subtle surface depressions provides a critical predictive layer to align 
with the subsurface data. 
• Targeted Linear Trenching: Rather than using a grid of speculative and destructive test 
pits, the ERI screening results will guide highly targeted, localized trenching. We 
anticipate trenching in rows spaced 25 to 50 feet on center, to a depth of 4 feet below 
existing grades and an approximate width of 2 feet. Trenches will be backfilled with 
compacted excavated material, and surfaces will be restored in kind. This approach 
allows physical soil sampling and subgrade inspections to be focused on where 
anomalies are identified. 
Through collaboration with SLR staff and our proposed advanced diagnostic framework, the 
Town can move from a position of speculation to one of clarity, ensuring public funds are 
deployed efficiently and effectively. 
Stadium Feasibility Study and Budget Alignment 
As part of the investigative phase, our team will prepare a comparative "Red/Green Report," 
evaluating available design and construction approaches for both the athletic field and running 
track improvements providing a side-by-side comparison of each improvement scenarios’ pros 
and cons. 
Unlike firms committed to a single design philosophy or proprietary product, our recommendations 
will be driven entirely by the Town’s vision, the site investigation results, and the available budget, 
including long-term maintenance considerations. Using precedent projects and comparable 
facilities—including the SLR-led athletic complex in Westfield, Massachusetts, completed in 
2026—the Town will gain a clear understanding of what can be achieved under a range of 
construction and budget scenarios. 

Page 44

Town of Granby 
Investigation and Design Services for Athletic Field Improvements 
 
October 13, 2026 
SLR Project No.: 141.P51644.00001 
 
 5  
 
   
 
11.1-million-dollar Westfield High School Stadium project completed by SLR, opened October 2026. 
The project includes a new multi-sport stadium with synthetic field, track, and restroom/concession 
building 
 
This process will help establish realistic expectations, identify opportunities for enhanced value, 
and determine the most effective path toward achieving the Town's long-term athletic facility 
goals. 
The Red/Green report will include side-by-side evaluations of: 
• Partial reconstruction focused on priority improvement areas 
• Full reconstruction of the athletic field and track 
• Post-tensioned concrete track with conventional field reconstruction 
• Full post-tensioned concrete (PT) track and field base system 
Each scenario will include initial construction costs, lifecycle costs, expected service life, and 
operational impacts associated with each option. 

Page 45

Town of Granby 
Investigation and Design Services for Athletic Field Improvements 
 
October 13, 2026 
SLR Project No.: 141.P51644.00001 
 
 6  
 
Lifecycle Cost and Maintenance Analysis 
For each reconstruction scenario, our team will provide a detailed assessment of anticipated 
maintenance requirements and associated long-term costs. This evaluation will allow Town 
officials to consider not only initial construction expenditures but also the long-term financial 
implications of each alternative. 
The analysis will include: 
• Annual maintenance requirements 
• Major repair and replacement cycles 
• Expected facility lifespan 
• Lifecycle cost comparisons 
• Operational considerations and risk factors 
Maximizing Available Funding 
The feasibility and alternatives analysis will demonstrate opportunities to stretch available 
capital dollars and potentially incorporate additional amenities that may otherwise be excluded 
from the project. 
Potential enhancements could include: 
• Electronic scoreboards 
• Restroom and concession facilities 
• Dugouts and team areas 
• Batting cages 
• Storage facilities 
• Spectator amenities 
• Site lighting and utility improvements 
By identifying the relative costs and benefits of various construction approaches, the Town can 
make informed decisions regarding facility priorities and project enhancements. 
Planning for Future Improvements 
The investigative phase will also establish a long-range master plan that allows future 
improvements to be implemented efficiently as funding becomes available. 
This planning effort may include: 
• Reserving space for future amenities and facility expansion 
• Strategic utility planning and installation of empty conduits 
• Installation of foundations and infrastructure for future lighting systems 
• Utility stub-outs for future buildings or site improvements 
• Phased implementation strategies that minimize the need for future reconstruction or 
rework 
Through proper planning and infrastructure coordination, future improvements can be added 
with significantly less disruption and cost. 
Decision-Making Framework 
At the conclusion of the investigative phase, the Town will receive a comprehensive reference 
document that clearly outlines facility needs, construction alternatives, maintenance 
implications, budget scenarios, and implementation strategies. 
 

Page 46

Town of Granby 
Investigation and Design Services for Athletic Field Improvements 
 
October 13, 2026 
SLR Project No.: 141.P51644.00001 
 
 7  
 
This document will serve as a defensible decision-making tool that provides elected officials, 
staff, stakeholders, and the public with a clear understanding of the options available and the 
rationale behind future investment decisions. The result is a data-driven roadmap that positions 
the Town to move forward confidently when funding opportunities arise while ensuring that all 
recommendations are made in the best long-term interest of the community. 
Phase 1 – Site Survey, Wetland Delineation, Drainage and Soil Investigations, and 
Geotechnical Investigations for Field Lighting 
 
Wetland Delineation 
SLR soil scientists will delineate and flag wetlands and watercourses adjacent to the project 
sites, including Kendall Brook. A wetland delineation report will summarize field observations 
and document jurisdictional resource boundaries for use in project planning, design, and 
permitting. 
Topographic Surveys  
SLR survey crews will complete detailed topographic surveys of Field Two and the Baseball 
Field project areas. The survey information will be used to prepare accurate base mapping and 
support development of the proposed design and construction documents. The drone-derived 
photogrammetry and topographic mapping for the Stadium Track and Field will be reconciled 
with the field topographic surveys. 
Drainage and Soil Investigations 
SLR engineers will evaluate the existing drainage infrastructure serving the Stadium Track and 
Field complex, including both surface and subsurface drainage systems. As part of this effort, 
SLR will arrange for closed-circuit television (CCTV) inspections of accessible drainage piping 
to assess pipe condition, functionality, and potential deficiencies. 
SLR will retain a qualified third-party sports field testing laboratory to perform limited, non-
invasive investigations of the existing synthetic turf systems at both the Stadium Field and Field 
Two. Testing will include localized access through the turf carpet to evaluate the permeability and 
condition of the underlying aggregate base materials and determine their suitability for reuse. The 
testing laboratory will also measure existing infill depths to assist in developing removal, disposal, 
and recycling cost estimates. 
SLR will arrange for and observe the excavation of a series of shallow test pits within the 
proposed baseball field area. Information obtained through these investigations will be used to 
quantify existing topsoil depths and estimate the volume of material that may require removal or 
relocation during construction. Should the Town elect to keep this facility grass in lieu of 
converting to synthetic turf, soil samples will be collected and submitted for particle size and 
nutrient analyses to determine appropriate amendments necessary to establish an optimal 
growing medium for natural turf. 
The test pits will also be used to characterize underlying soil conditions and evaluate subsoil 
permeability, groundwater indicators, and drainage characteristics that may influence the design 
of the proposed field drainage system. Findings from the investigation will help refine drainage 
design concepts and associated construction cost estimates. No additional analytical soil testing 
is proposed as SLR will rely on the recent testing completed by Weston & Sampson, Inc., which 
demonstrated that excess soils may be disposed of off site without additional characterization. 
The overall assessment will provide recommendations regarding rehabilitation, reconstruction, 
or phased implementation strategies and will serve as a technical basis for future planning, 

Page 47

Town of Granby 
Investigation and Design Services for Athletic Field Improvements 
 
October 13, 2026 
SLR Project No.: 141.P51644.00001 
 
 8  
 
budgeting, funding requests, and design decisions. The information collected during these 
investigations will support the development of practical and cost-effective grading and drainage 
solutions tailored to existing site conditions. 
This information will support the development of practical and cost-effective site grading and 
drainage solutions tailored to the existing conditions of the facility. 
Geotechnical Investigation for Field Lighting 
For the Baseball Field, SLR will perform geotechnical borings to evaluate subsurface conditions 
at the proposed lighting structure locations. Based on previous project experience, we anticipate 
that six light poles will be required to achieve high-school-level athletic lighting standards. SLR 
will perform geotechnical engineering analyses and prepare a geotechnical report summarizing 
subsurface conditions encountered during drilling. The report will identify geotechnical 
considerations associated with the proposed lighting system and provide foundation design and 
construction recommendations for the project. 
Upon completion of all Phase 1 investigations and analyses, SLR will compile available records, 
field observations, survey information, and subsurface investigation findings into a 
comprehensive Existing Conditions Assessment Memorandum. The memorandum will 
summarize existing site conditions, identify key opportunities and constraints, and provide the 
technical foundation for subsequent planning, design, permitting, and cost estimating efforts. 
Phase 1 – Investigation Estimated Fees 
SLR estimates the fee range for Phase 1 to be $100,000 to $112,000. 
Below is a simple breakdown of our estimated fee for Phase 1 assessments and investigations: 
 
 
SLR’s Estimated Fees 
Estimated Staff 
Hours 
SLR  
Subcontractors  
Geotechnical Investigation - 
Stadium 
$30,000 - $40,000 
Influenced by extent of 
soil trenching needed 
150 – 200 GPR Clearance, Driller/Excavator, ERI 
Stadium Feasibility  
Study 
$10,000 - $12,000 
Influenced by options the 
town may want explored 
50 – 60 None 
Wetland  
Delineation  $6,500 40 None 
Topographic  
Survey $22,000 100 None 
Drainage and Soil 
Investigations $11,500 40  Video Inspection, Third-Party Lab Testing 
Geotechnical Investigation – 
Lighting  $20,000 60 GPR Clearance, Driller/Excavator 
Total Estimated Fee: $100,000 - $112,000   
 
Phase 1 – Investigation Timeline 
The timeline provided below assumes that the Town will select SLR at the Public Building and 
Capital Project Committee (PBCPC) meeting on October 14. Following selection, SLR will 
prepare a detailed scope of services for the Town's review and approval, either prior to or at the 
subsequent PBCPC meeting. Upon approval of the scope and successful contract negotiations, 

Page 48

Town of Granby 
Investigation and Design Services for Athletic Field Improvements 
 
October 13, 2026 
SLR Project No.: 141.P51644.00001 
 
 9  
 
the Town and SLR will execute a professional services agreement by the end of the month, 
allowing Phase 1 activities to commence immediately thereafter. 
Please note that should the Town and PBCPC be able to expedite the contract process SLR is 
prepared to start immediately upon the approval of the detailed scope of services. We would 
anticipate a 2-week process to negotiate an agreed-upon scope and fee.  
 
 November  
2026 
(See Note 1 below) 
December 
2026 
January 
2027 
Geotechnical 
Investigation - Stadium 
   
Stadium Feasibility 
Study  
   
Wetland  
Delineation 
   
Topographic  
Survey 
   
Drainage and Soil 
Investigations 
   
Geotechnical 
Investigation – Lighting 
   
 
Note 1: 
Should the Town desire to kickstart the contract prior to the resolution vote, SLR is available to 
provide a reduced initial scope focused solely on the Stadium Field and Track investigative 
phase. This approach can provide the Town and PBCPC with a clear path forward to detailed 
design, bidding, and construction, regardless of the December resolution vote. We anticipate an 
early November start date could be achieved under this scenario. This would also more likely 
allow for the investigative work to be conducted prior to winter weather delays. 
Note 2: 
Phase 1 field investigations are dependent upon suitable weather and site conditions. Should 
winter conditions occur earlier than anticipated, significant snow cover or frozen ground 
conditions may delay or limit SLR's ability to perform survey, environmental, geotechnical, and 
subsurface investigation activities. Should SLR be selected, a contingency plan to progress the 
project during winter weather can be coordinated as the detailed scope of services is finalized. 
Phase 2 – Design and Engineering Approach for the Stadium Field, Running 
Track, Field Two, and the Baseball Field:   
A. Design Development 
a. Following completion of the geotechnical, drainage, survey, and environmental 
investigations, SLR will develop design documents for the reconstruction of the 
Stadium Field and Running Track, replacement of the Field Two synthetic turf 
system, and construction of a new synthetic turf baseball/multipurpose field at the 
location of the existing baseball field. Design solutions will incorporate the 
findings and recommendations of the Phase 1 investigations and will address 
grading, drainage, stormwater management, accessibility, and other site-specific 
requirements. SLR will begin by preparing new conceptual design plans, 

Page 49

Town of Granby 
Investigation and Design Services for Athletic Field Improvements 
 
October 13, 2026 
SLR Project No.: 141.P51644.00001 
 
 10  
 
incorporating the requested improvements at each site. Once these plans have 
been reviewed and approved by the PBCPC, we will advance the plans to a level 
of design suitable for review and approval by Town land use commissions.    
B. Permitting Assistance 
a. SLR will assist the Town with the preparation and submission of applications to 
the Inland Wetlands and Watercourses Commission and the Planning and 
Zoning Commission, as required. Services will include preparation of supporting 
exhibits and technical documentation, attendance at public meetings, and 
presentation of the proposed improvements to facilitate regulatory review and 
approval. 
C. Final Construction Documents 
a. Following receipt of all required approvals, SLR will finalize the construction 
documents and incorporate any conditions imposed during the permitting 
process. The final bid package will include signed and sealed engineering 
drawings, technical specifications, and other documents necessary to publicly bid 
the work and secure qualified construction contractors. 
D. Opinions of Probable Construction Cost 
a. Throughout the design process, SLR will prepare and update Opinions of Probable 
Construction Cost for each individual project component, including the Stadium 
Field and Track, Field Two, and Baseball Field. SLR will also prepare a 
consolidated cost estimate evaluating the full program of improvements, allowing 
the Town to assess potential phasing strategies and establish project budgeting 
priorities. 
In accordance with the Town’s request for information limited to the development of a bid-ready 
project, bid-phase and construction-phase services are excluded from the scope and fee 
presented herein. SLR is available and fully qualified to provide these services should the Town 
require them in the future. 
Phase 2 – Design and Engineering Estimated Fees for the Stadium Field, Running 
Track, Field Two, and the Baseball Field: 
SLR estimates the fee range for Phase 2 to be $425,000 to $485,000. 
Below is a simple breakdown of our estimated fee for Phase 2 assessments and investigations: 
 SLR’s Estimated Fees Estimated Staff Hours SLR Subcontractors  
Design  
Development $125,000 -$150,000 600 – 750 Electrical Engineer 
Permitting 
Assistance  $15,000 - $25,000 70 – 120 None 
Final  
Construction 
Documents 
$275,000 - $325,000 1,300 – 1,600 Electrical Engineer 
Opinions of Probable 
Construction Costs $10,000 50 None 
Total Estimated Fee: $425,000 - $485,000   
 

Page 50

Town of Granby 
Investigation and Design Services for Athletic Field Improvements 
 
October 13, 2026 
SLR Project No.: 141.P51644.00001 
 
 11  
 
 
Phase 2 – Design and Engineering Timeline for the Stadium Field, Running Track, 
Field Two, and the Baseball Field: 
Upon completion of the Phase 1 investigations and subsequent authorization to proceed, SLR 
proposes the following schedule for design and engineering services. This timeline assumes 
that Phase 1 activities are completed in accordance with the previously outlined schedule and 
that the PBCPC authorizes Phase 2 services shortly thereafter, allowing the project to advance 
without interruption.  
 January 
2027 
February 
2027 
March 
2027 
April 
2027 
May 
2027 
June  
2027 
Preliminary 
Design 
      
Permitting 
Assistance*  
      
Final  
Design 
      
Opinions of 
Probable 
Construction 
Costs 
      
* Permitting review and approval schedules are controlled by the applicable regulatory commissions and 
are outside of SLR's control. While SLR may proceed with final design concurrent with permit review to 
maintain project momentum, doing so carries risk as permit conditions or agency comments may require 
design revisions, resulting in additional effort, cost, and schedule impacts before the project is ready for 
bidding. 
Deliverables Summary 
Phase 1: 
• Stadium Field and Track Geotechnical Report Including Electrical Resistivity Imaging 
(ERI) And Linear Trenching Results 
• Stadium Field and Track Drone Based Photogrammetry and Topographic Mapping 
• Stadium Field and Track Red/Green Report 
• Stadium Field and Track Turf Assessment, Removal and Recycling Data 
• Field 2 And Baseball Field Topographic Survey Base Mapping 
• Baseball Field Soil Assessment 
• Baseball Field Lighting Geotechnical Report 
• Drainage Assessment – All Fields 
• Wetland Delineation Report  
Phase 2: 
• Detailed Design Plans – Preliminary and Final Design 
• Permitting Assistance Including Applications and Presentation Exhibits 
• Technical Specifications 
• Opinions Of Probable Construction Costs– Three Submissions Assumed 
 

Page 51

Town of Granby 
Investigation and Design Services for Athletic Field Improvements 
 
October 13, 2026 
SLR Project No.: 141.P51644.00001 
 
 12  
 
Exclusions And Limitations 
Please note that the following services have not been considered when preparing this project 
service narrative and, therefore, have not been accounted for in our estimated fees: 
1. Boundary survey 
2. Archaeology studies 
3. Design of offsite improvements and/or offsite drainage capacity analysis 
4. Traffic impact studies 
5. Building design 
6. Mechanical, plumbing, and fire safety engineering 
7. Design and engineering of any additional items beyond the scope of the preliminary design 
effort described herein 
8. Bid assistance 
9. Construction-phase services 
SLR and Granby  
SLR's proposed approach is designed to provide the Town with the technical information, 
planning framework, and cost certainty necessary to make informed decisions regarding future 
improvements to its athletic facilities. Through a comprehensive program of site investigations, 
field assessments, engineering analyses, and stakeholder coordination, we will establish a clear 
understanding of existing conditions, opportunities, and constraints. The resulting deliverables 
will position the Town to advance confidently into design, permitting, and construction while 
minimizing risk, controlling costs, and supporting successful project implementation. 
We will be the Town’s experts and can confidently assure the Town and Building Committee 
that a successful outcome will be achieved. By selecting SLR, you will be gaining a strategic 
partner with all critical services provided by in-house experts, allowing us to better control 
schedule, response times, and quality. We are committed to our clients and will provide Granby 
with the information necessary to build high-quality athletic facilities that showcase the 
thoughtfulness, ingenuity, and fiscal responsibility of Town staff and Town residents alike.  
We sincerely appreciate the opportunity to assist the Town with this transformational project. 
Should you require any additional information, please do not hesitate to contact either of the 
individuals listed below. 
Regards, 
SLR International Corporation 
  
Kevin Fuselier, PLA, LEED GA 
Senior Principal / Team Leader,  
Landscape Architecture 
kkuselier@slrconsulting.com 
Michael T. Doherty, PLA 
North America Practice Leader,  
Landscape Architecture 
mtdoherty@slrconsulting.com 
141.12712.p0007.o1326.prop 

Page 52

REQUEST FOR PROPOSAL
Town of Granby
MEP Work at Granby Memorial Middle 
School
October 13, 2026

Page 53

BL Companies
Table of Contents
Section I Letter of Interest 
Section II   Firm Overview 
Section III   Project Approach
Section IV  Relevant Project Experience
Section V  Fee Proposal

Page 54

SECTION I 
Letter of Interest 

Page 55

October 13, 2026
Mr. Michael Walsh
Town Manager
Town of Granby
15 North Granby Road
Granby, CT 06035
Re: Granby Memorial Middle School - MEP Engineering Proposal
Dear Mr. Walsh, 
BL Companies Connecticut, Inc. (“BL Companies”) is pleased to submit our qualifications 
and fee proposal for MEP Engineering Services for the HVAC investigation and design 
services at Granby Memorial Middle School. With our extensive in-house capabilities, 
proven public school experience, and commitment to responsive, high-quality service, we 
are well-equipped to support the Town of Granby through these important services.
We understand that these projects demand technical precision, thoughtful coordination, 
and a strong understanding of both school operations and grant reimbursement 
processes. Our team brings decades of experience delivering MEP and structural services 
across Connecticut K–12 environments — including site surveys, existing conditions 
assessment reports, design from schematic design through permit and construction 
documents, construction administration, field observation, RFI and submittal review, 
change order evaluations, and close collaboration with all project stakeholders.
Your scope includes:
• Mechanical, Electrical, Plumbing, and Fire Protection Engineering services for 
the investigation, evaluation, assessment, and prioritized recommendations for 
additions, modifications, and replacement of select MEP system. 
• Following the initial investigation phase, design and engineering services for the 
priority MEP improvements to develop engineering plans and specifications suitable 
for bidding and construction. 
• Cost estimating.
BL Companies is proud to offer:
• Comprehensive In-House Expertise – Our team includes licensed engineers and 
LEED-accredited professionals across MEP, Architecture, Structural, and Civil 
disciplines, all under one roof.
355 Research Parkway, Meriden, CT 06450 T (203) 630-1406 www.blcompanies.com

Page 56

• Proven K–12 and Municipal Experience – We’ve supported HVAC renovations, system 
upgrades, and construction phase services at numerous public schools throughout 
the state.
• Dedicated Resources and Local Capacity – With over 30 MEP professionals and 
more than 384 employees company-wide, we have the capacity and flexibility to 
fully support both projects over the anticipated 18-month schedule.
Thank you for the opportunity to submit. We are enthusiastic about the potential to 
support the Town of Granby and remain available to discuss our qualifications in more 
detail. 
Sincerely,
BL Companies
Evan Silberquit, PE
MEP Manager - Principal
860.760.1907
esilberquit@blcompanies.com
355 Research Parkway, Meriden, CT 06450 T (203) 630-1406 www.blcompanies.com

Page 57

SECTION II 
Firm Overview

Page 58

About BL Companies
Your Partner for Integrated Services & Creative Solutions. 
Founded in 1986, BL Companies delivers an integrated blend of 
architecture, engineering, environmental, and land surveying services 
on projects throughout the United States. Our multidisciplinary 
teams collaborate daily to plan, design, and develop the spaces and 
infrastructure that shape everyday life. From small assignments to 
large, complex programs, we approach each project with the agility 
and insight needed to provide creative, high‑quality solutions grounded 
in technical expertise. 
BL Companies is a leading multidiscipline firm, regularly ranked as a Top 
500 Design Firm by Engineering News Record. With over 150 licensed 
professionals, BL Companies brings the resources and capabilities of 
a large firm while our employee‑ownership culture and commitment 
to client care ensures we provide the personal, attentive service of 
a small firm. Driven by a culture of excellence and responsiveness, we 
remain firmly committed to total client satisfaction and consistently 
deliver exceptional results.
As a 100% employee‑owned owned company, we believe in the power 
of teamwork and long‑lasting partnerships. Our dedicated employees 
are the backbone of our firm and our professional community. Being 
employee‑owned and team‑oriented means we celebrate each other’s 
successes as a united force because there are no boundaries to what 
we can achieve when working together. Our tagline, “Employee Owned. 
Client Driven.”, isn’t just a phrase to us; it informs our collaborative 
process and encourages us to deliver solutions that go beyond 
individual efforts, ensuring a result that surpasses client expectations.
SERVICES
Architecture
Civil Engineering
Environmental Services
Land Surveying & 
Geospatial Services
Construction 
Administration
Energy Services
Landscape Architecture
MEP Engineering
Planning
Structural Engineering
Subsurface Utility 
Engineering 
Transportation 
Engineering
PEOPLE
ESTABLISHED
OUR MISSION
Our mission is to provide creative solutions that enhance the built 
and natural environment through the leadership and dedication of our 
employee owners working in partnership with our clients.
EMPLOYEE-OWNED
ENR TOP 500 FIRMS
OFFICES
18
365+
1986
100%
231
13
STATES
BL Companies

Page 59

BL Companies
Office Locations
CONNECTICUT
Meriden (Corporate HQ)
355 Research Parkway
Meriden, CT 06450-7100
Hartford
New East Hartford Office opening 
soon!

Page 60

BL Companies
KEY SERVICES
Heating, Ventilation & Air 
Conditioning (HVAC)
Central Heating & 
Cooling Plants
Air, Water & Ground 
Source Heat Pump 
Systems
Variable Refrigerant Flow 
(VRF) Systems
Energy Recovery 
Systems
Sustainable Design 
Solutions
Energy Modeling & Life 
Cycle Cost Analyses
Energy Conservation 
Studies
Indoor Air Quality 
Analyses & 
Improvements
Code Compliance 
Studies
Integrated Control 
Systems & Building 
Management Systems
MECHANICAL ENGINEERING
Engineering Smarter Spaces 
from the Inside Out
BL Companies delivers integrated solutions for the design, 
management, and maintenance of building and facility 
systems. With comprehensive in-house expertise in mechanical, 
electrical, plumbing (MEP), and fire protection engineering, 
we support all phases of building design, renovation, and 
modernization.
Our MEP professionals work closely with clients to design 
comfortable, healthy, and high-performing indoor environments. 
We take a collaborative approach to understand the unique 
operational, budgetary, and sustainability goals of each project—
whether designing a new system or upgrading an existing one. 
 
At the core of every successful project is a well-designed system. 
Our Mechanical Engineering Team develops energy-efficient, cost-
effective, and environmentally responsible solutions that are safe, 
reliable, and easy to maintain. As a member of the U.S. Green 
Building Council with LEED accredited professionals on staff, BL is 
committed to creating flexible, future-ready systems that enhance 
building performance for years to come.

Page 61

BL Companies
KEY SERVICES
Renewable, Distributed 
Generation & Microgrid 
Systems 
 
High & Medium 
Voltage Substations & 
Distribution Systems 
 
Low Voltage Power 
Distribution Systems 
 
Ups, Emergency, 
Standby & Mission 
Critical Systems 
 
Fire Alarm & Life Safety 
Systems 
 
Telecommunication & 
Computer Data Systems 
 
Grounding & Lightning 
Protection Systems 
 
Ev Charging Station 
Design 
 
PV System Design 
 
ELECTRICAL ENGINEERING
Designing Reliability Into 
Every Connection
BL Companies delivers full-service electrical engineering 
solutions for all phases of building design and renovation. 
Our team designs safe, reliable, and energy-efficient systems—
integrating lighting and power distribution with architectural intent 
to enhance performance, support sustainability, and reduce carbon 
footprint. We collaborate closely with clients to create flexible, 
cost-effective systems that can adapt to future needs. As a 
member of the U.S. Green Building Council, our work is backed by 
LEED accredited professionals committed to long-term building 
resilience.
• Public Address, Av And Sound 
Systems
• Architectural Lighting Design
• Site Lighting Design
• Lighting Controls
• Photometric Modeling
• Short-Circuit, Coordination & 
Arc Fault Analysis
• Power Quality & Harmonic 
Analysis
• Theater Lighting 
SPECIALTIES

Page 62

BL Companies
KEY SERVICES
Domestic Water 
Distribution 
 
Domestic Hot Water 
Systems 
 
Passive Drainage Waste 
and Vent Systems 
 
Sanitary Waste 
Treatment Systems 
 
Pumped Waste and 
Ejector Systems 
 
Storm Water Recycling 
Systems 
 
Fuel Gas Systems 
 
Commercial Kitchen 
Systems 
 
Plumbing Code Studies 
 
PLUMBING ENGINEERING
Efficient Plumbing Engineering 
for Modern Buildings
At BL Companies, we design high-performing plumbing systems 
that meet the demands of today’s increasingly complex 
buildings. From efficient domestic water supply and hot water 
systems to gravity-based waste and vent systems, our “less is 
more” approach emphasizes reliability, sustainability, and smart 
design. We offer innovative solutions like vacuum drainage for 
challenging retrofits, and our team is experienced in specialized 
systems for hospitals and laboratories—including medical gas and 
acid waste treatment. Every design incorporates water-saving 
strategies, reflecting our commitment to conserving resources and 
protecting the public water supply.
• Solar Domestic Hot Water 
Systems
• Vacuum Drainage Systems
• Water (Grey Water) Recovery 
and Recycling
• Pharmaceutical RO / DI Water 
Systems
• Bulk Gaseous Storage Systems
• Laboratory and Medical Gas 
Systems
• Laboratory Compressed Air 
and Vacuum
• Laboratory Waste Collection / 
Treatment
• Specialty Gas Systems
• Hospital and Clinical Piped 
Services
• Process Liquid and Gas 
Systems
• Water Conservation Studies
• LEED & HPB Compliant Systems 
SPECIALTIES

Page 63

BL Companies
KEY SERVICES
Wet Automatic Fire 
Suppression Systems 
 
Dry, Deluge & Pre-Action 
Fire Sprinkler Systems 
 
Standpipe Systems 
 
Fire Alarm and Detection 
Systems 
 
Smoke Evacuation and 
Exhaust 
 
Condition Assessment 
and Due Diligence 
Studies 
 
Code Compliance 
Studies 
 
Site Distribution 
Systems
FIRE PROTECTION ENGINEERING
Engineered for Safety, 
Designed to Protect
BL Companies provides specialized fire protection engineering 
services tailored to each project’s unique hazards and 
requirements. 
Our experienced team designs code-compliant suppression 
systems—from standard water-based sprinkler and standpipe 
systems to advanced solutions like clean agent systems and 
double-interlock pre-action systems with non-ferrous components. 
Whether designing for new construction or retrofitting systems for 
renovations and reconfigurations, we deliver safe, effective, and 
reliable fire protection solutions for every type of building.
• Fire Pumps
• Fire Water Storage
• Hydraulic Piping System 
Analysis
• Foam Special Hazard Systems
• Gaseous Extinguishing Systems
SPECIALTIES

Page 64

BL Companies
KEY SPECIALTIES
New Construction & 
Additions
Rehabilitation & 
Renovation
Historic Preservation
Adaptive Reuse
Prototype Design and 
Development
Interior Architecture
Sustainable Design
3D Visualizations
ARCHITECTURE
Blending Creativity with 
Technical Expertise
By establishing a clear understanding of our client’s objectives, 
BL Companies delivers thoughtful architectural designs by 
addressing all of the elements surrounding a project.
We talk objectives, vision, schedule, and budget in order to 
develop designs that serve our client’s needs and enhance their 
environment. Our talented staff of architects has the benefit of 
coordinating with our in-house engineering, planning, and landscape 
architecture staff for seamless client service. 
Through rigorous cross-discipline collaboration, we deliver designs 
that balance aesthetics, function, cost and quality. We are also a 
member of the US Green Building Council, and we are proud of our 
commitment to sustainable design. 
Our staff includes multiple LEED Accredited Professionals who have 
produced numerous LEED-certified designs.

Page 65

BL Companies
KEY SERVICES
Inspections & 
Investigations
Construction 
Administration & 
Support
3D Visualizations
STRUCTURAL ENGINEERING
Structurally-Sound Designs
When it comes to structural engineering, our best work is never 
seen. This philosophy of invisible excellence seamlessly blends 
technical, fiscal, and environmental concerns, resulting in 
structurally sound designs that our clients love.
Emphasizing practicality and constructibility, our solutions are as 
attractive as they are economical. From retail centers to mixed-use 
constructions, storage facilities to schools, parking structures to 
building renovations, and warehouse-industrial projects, we have a 
proven track record of success. Whatever the task, we assemble 
a specialized team to cater to specific requirements and foster 
collaboration with the design team for outstanding outcomes.
• New Construction & Additions
• Rehabilitation & Renovation 
Foundation for Pre-Engineered 
Metal Buildings
• Retaining Walls & Excavation 
Support Systems
• Supports for 
Telecommunication Equipment 
Equipment 
• Supports for Gas & Electrical 
Transmission Industry
• Bridge Design
SPECIALTIES

Page 66

BL Companies
KEY SERVICES
EPA Tools for Schools 
Inspections and IAQ 
Evaluations
Water Damage and 
Moisture Mapping 
Investigations
Microbial Assessments 
and Post-Remediation 
Verification
Allergen, Odor, and Surface 
Sampling (Mold, E. coli)
VOCs, Chemical 
Compounds, and Radon 
Testing
Asbestos, Lead, and PCB 
Sampling (Including PCBs 
in Air)
Construction Dust and 
Silica Exposure Sampling
HVAC and Facility 
Cleanliness Inspections
INDOOR AIR QUALITY
Creating Healthy Indoor 
Spaces for Schools
BL Companies provides comprehensive Indoor Air Quality (IAQ) 
testing and evaluation services, supported by an in-house team 
of industrial hygienists, scientists, engineers, and licensed field 
staff. 
Our experts currently manage IAQ programs for multiple 
municipalities and school districts across Connecticut and serve as 
one of Vermont’s primary consultants for PCB evaluations in public 
schools under Act 74. 
As part of our commitment to healthy learning environments, BL 
assists schools in implementing the EPA’s Indoor Air Quality Tools for 
Schools program—an initiative now required annually in Connecticut 
beginning January 1, 2024, per Public Act No. 23-167. This program 
establishes standardized inspection, evaluation, and reporting 
protocols to ensure cleaner, safer indoor environments for students 
and staff. BL also supports schools with HVAC inspections, moisture 
and mold assessments, and environmental testing to meet evolving 
state and federal standards. Our team partners with districts 
to interpret new regulations, streamline compliance, and create 
healthier indoor spaces for every occupant.

Page 67

SECTION III 
Project Approach

Page 68

BL Companies
Detailed Approach and 
Methodology
BL Companies has assembled a highly qualified team with extensive 
experience in supporting facility upgrade projects for K-12 schools, 
who will remain dedicated to this project for its duration to ensure 
a timely and successful completion. Additionally, our team includes 
licensed professionals with expertise in architectural, structural, and 
environmental design, providing a comprehensive and integrated 
approach should those disciplines be required.
To further demonstrate our capabilities, we have included a 
selection of recent school projects within this proposal.
At the start of each project, BL Companies assigns a senior 
professional as the primary point of contact to ensure seamless 
communication and effective project execution. This individual 
meets with the client to gain a clear understanding of project 
needs, objectives, and established protocols for contracting and 
implementation. Their role is to ensure that all assigned project 
staff fully understand the scope of work, contractual obligations, 
and required procedures. They also serve as the client’s single 
point of contact, streamlining communication and overseeing the 
delegation of all project services—regardless of scope or discipline.
For Granby’s Memorial Middle School, Jesse Vose, PE, will serve 
as the Project Lead and primary point of contact, ensuring a 
responsive and coordinated approach throughout the duration 

Page 69

BL Companies
of the project.  Once work authorization is finalized, the assigned project teams will convene 
for a kickoff meeting to review the scope, schedule, budget, and expected outcomes. During 
this meeting, we will also establish clear lines of communication with the designated client 
representative(s) to ensure alignment throughout the project. This proactive approach allows us 
to gain a thorough understanding of the Town of Granby’s needs and objectives, helping to ensure 
seamless and efficient execution.throughout the duration of the project.  Once work authorization 
is finalized, the assigned project teams will convene for a kickoff meeting to review the scope, 
schedule, budget, and expected outcomes. During this meeting, we will also establish clear lines of 
communication with the designated client representative(s) to ensure alignment throughout the 
project. This proactive approach allows us to gain a thorough understanding of Brookfield’s needs 
and objectives, helping to ensure a seamless and efficient execution.
Effective communication is essential at every phase of a project to achieve a successful outcome. 
Our primary project contact will be responsible for ensuring clear and consistent communication 
from start to finish. Should any of the Town of Granby’s representatives have any concerns 
regarding service expectations, our primary point of contact will be readily available to address 
and resolve any issues. Additionally, a designated principal is assigned to each contract to monitor 
performance and serve as a high-level liaison, ensuring accountability and client satisfaction.
PROJECT SCOPE & OBJECTIVES
BL Companies understands that the Town of Granby is seeking a phased approach to address 
code and MEP needs at Granby Memorial Middle School. The immediate objective is to identify 
practical repairs and improvements within the proposed $3,000,000 total project budget, while 
establishing a plan for a larger bond issue in seven years. 
Our approach will focus on equipment reliability, ventilation, fire protection, and the supporting 
building systems needed to keep the school operating. We will review the available assessments, 
record drawings, site photographs, and maintenance history to build on work already completed. 
The June 2026 HVAC study identifies ventilation and controls deficiencies that will be evaluated 
together with the equipment condition and operating concerns documented by school staff. 
Following collaboration with the Town to prioritize and finalize the Phase 1 scope of work, we will 
prepare construction documents suitable for soliciting competitive public bids. These documents 
will include plans, elevations, sections, details, schedules, and notes, as required. In addition to the 
drawings, a complete set of specifications will be prepared. We will also provide a cost estimate 
based on the construction documents.
At all phases of the project, communication will be important to maintaining an agreed scope 
and budget. We will review findings and recommendations with the Town before advancing the 
selected improvements into design. Proposed work will account for school occupancy, access to 
existing equipment, shutdown requirements, and the Town’s longer-term plans for the facility. We 
will maintain communication with Town staff, school facilities personnel, and the Public Building and 
Capital Project Committee.

Page 70

BL Companies
The goal of this project is to investigate existing conditions, identify applicable code requirements, 
and prepare a prioritized implementation plan for the Middle School. A general overview of the 
scope includes the following:
• Review the existing assessments, ventilation measurements, record drawings, site notes, and 
photographs, followed by verifying conditions affecting the proposed improvements.
• Evaluate HVAC equipment, outdoor air delivery, exhaust, controls, and supporting electrical 
and plumbing systems. Review existing fire protection coverage and available water supply 
information.
• Identify near-term repairs and replacements, associated building impacts, and work that can 
be deferred to the larger capital program.
• Develop engineering plans, specifications, and a construction cost estimate for the finalized 
design scope selected by the Town.
PHASING
This project will be delivered in the following two phases:
• Phase 1 – Investigation
• Phase 2 – Design & Engineering
Phase 1 - Investigation
 – BL Companies to meet with the Town and school facilities staff to confirm priorities, 
funding assumptions, school operating constraints, and the investigation schedule. Gather 
and review the existing condition assessments, June 2026 HVAC study and testing data, 
2025 visual inspection, record drawings, maintenance records, and site documentation.
 – Visit the site to review accessible equipment and building conditions. Verify equipment 
identification, recent replacements, roof and mechanical room access, available ceiling 
space, and installation routes. Document conditions affecting the proposed work, including 
visible corrosion, insulation, piping, roof penetrations, and maintenance access.
 – Evaluate air handling units, rooftop units, condensing units, return and exhaust fans, 
VAV boxes, hydronic systems, and controls. Review outdoor air ventilation requirements 
for typical listed room uses and occupancies, and assess space heating, cooling, and 
dehumidification capabilities along with the Town’s priorities for those spaces. Reconcile 
inconsistencies in the reports and provide recommendations.
 – Review occupancy, construction type, existing sprinkler coverage, fire alarm interfaces, 
and code requirements applicable to the proposed sprinkler system work. Review well 
and water supply records and available flow information to identify whether additional 
testing, storage, a fire pump, or other infrastructure would be needed to support sprinkler 
improvements.
 – Assess electrical capacity, distribution, and equipment connections. Assess the electrical 
priorities identified in the condition report, including panels, ground-fault protection, and 
emergency lighting.

Page 71

BL Companies
 – Review plumbing, domestic hot water heaters, and condensate disposal systems. Verify 
the condition and capacity of equipment proposed to remain before recommending 
replacement or reuse.
 – Develop prioritized repair and replacement options with existing planning-level construction 
costs up to $3,000,000 as authorized by the Town. 
 – Evaluate controls replacement and repairs, ventilation, selective equipment replacement, 
and supplemental ventilation where appropriate. 
 – Identify improvements that can remain useful in the longer-term plan and distinguish 
immediate needs from comprehensive system renewal in the longer term, identifying 
deferred improvements, remaining service-life risks, and the relationship between near-
term work and a future larger bond program. 
 – Issue investigation and assessment results summarizing existing conditions, code 
considerations, options, recommended priorities, preliminary costs, and implementation 
sequencing. Review with the Town and PBCPC and confirm the scope, budget, and design 
criteria to advance into Phase 2.
Phase 1 - Schedule
For planning purposes, allow approximately four to six weeks after authorization and receipt of 
available records for investigation and preparation of recommendations, followed by Town review. 
The schedule will be confirmed at kickoff and will depend on access to occupied areas, operating 
conditions, and any additional issues identified during the investigation.
Phase 2 - Design & Engineering
 – Confirm the Town-selected scope, available construction budget, and design criteria 
developed in Phase 1. Establish design review milestones and coordinate the anticipated 
construction sequence with the school calendar and equipment procurement 
requirements.
 – Perform focused field verification for the selected improvements. Confirm connection 
points, dimensions, existing services, access and rigging routes, and ceiling or finish 
impacts needed to develop coordinated construction documents.
 – Develop HVAC and controls designs for the selected work, including equipment selections, 
ventilation calculations, ductwork and piping modifications, control diagrams, sequences 
of operation, and testing and balancing requirements. Evaluate packaged replacement 
units where practical and address moisture control and integration with systems to remain.
 – Prepare design of electrical modifications required for the selected equipment, including 
load and capacity checks, power connections, disconnects, associated distribution 
changes, and controls or fire alarm interfaces as applicable.
 – Develop plumbing and fire protection modifications included in the selected scope. Address 
hydronic and condensate connections and, where sprinkler work is selected, establish 
coverage, design criteria, water supply requirements, calculations, and system interfaces 
appropriate to the design scope.

Page 72

BL Companies
 – Prepare coordinated engineering drawings and specifications defining demolition, new work, 
equipment, system connections, and installation requirements. 
 – Prepare a new construction cost estimate as design progresses. Review the estimate against 
the agreed construction allowance to identify scope adjustments or alternates for Town 
consideration before finalizing the documents.
 – Perform interdisciplinary coordination and professional quality assurance reviews. Resolve 
conflicts between the proposed work and existing systems to remain. Verify that the plans and 
specifications reflect the agreed design criteria and budget decisions.
Review the design with the Town, school facilities staff, and applicable reviewing officials. Incorporate 
agreed comments and issue final engineering plans, specifications, and a construction cost estimate 
for the Construction Documents (100% complete submission).
Phase 2 - Schedule
For planning purposes, allow approximately ten to fourteen weeks after approval of the Phase 1 
recommendations and authorization to proceed with the selected design scope. This schedule allows 
a two-week period for the Town’s review of the Design Development (50% complete submission) 
documents. Final timing will be coordinated with Town review periods and the extent of the approved 
work. These durations are proposed planning allowances and do not establish a construction 
completion date.
Clarifications
• The project’s scope of work will be fully defined and authorized by the Town at the end of 
Phase 1 (Investigation). Any changes to the scope during Phase 2 (Design & Engineering) shall be 
considered additional services. 
• Architectural, structural engineering, and environmental services were not required by the Town 
of Granby’s RFP for this project. As such, they are not included in our fees but could be provided 
as an additional service. Our architectural, structural, and environmental teams have significant 
experience with school projects in Connecticut.
• Bid Period and Construction Period services were not required by the Town’s RFP for this 
project. Similarly, they are not included in our fees but could be provided as an additional 
service as directed and requested by the Town, at BL’s current hourly billing rates.  BL can 
provide construction administration services which include, but are not limited to, construction 
observation and site visits, review of shop drawings and submittals, responses to Requests for 
Information (RFIs), and review of contractors’ requests for payment.
• Testing and balancing, destructive investigations, and hazardous materials testing / abatement 
are not anticipated requirements during the design services for Phases 1 and 2, and are not 
currently included in our fees. 

Page 73

BL Companies
RELEVANT EXPERIENCE
History of Firm’s Experience in the Design of Building Infrastructure for State and Municipal 
Agencies
Throughout its 40-year history, BL Companies has successfully delivered infrastructure design for a 
wide range of municipal and educational facilities. Our experience includes both recent and long-
standing engagements with state and local agencies. Highlights include:
• Public K-12 Schools: BL Companies has extensive experience designing HVAC upgrades and 
infrastructure improvements for public schools across Connecticut. Recent projects include:
 – Berlin: Griswold Elementary School and Hubbard Elementary School
 – East Granby: East Granby Middle School and High School
 – Ellington: Center School, Ellington Middle School, and Ellington High School
 – Fairfield: Osborn Hill Elementary School, North Stratfield Elementary School, Fairfield Woods 
Middle School, Tomlinson Middle School, Walter Fitzgerald Campus, Fairfield Ludlowe High 
School, and Fairfield Warde High School
 – Madison: Polson Middle School and Daniel Hand High School
 – Manchester: Illing Middle School
 – Norwich: Kelly STEAM Magnet Middle School
 – Stonington: Mystic / Stonington Middle School
 – Stamford: Scofield Magnet Middle School, Turn of River Middle School, Rippowam Middle 
School, Stillmeadow Elementary School, and Stamford High School
 – Waterbury: Driggs Elementary School, Washington Elementary School, M.M. Generali 
Elementary School, Maloney Interdistrict Magnet School, Walsh Elementary School, Hopeville 
Elementary School, F.J. Kingsbury Elementary School, Tinker Elementary School, Wilby High 
School, North End Middle School, Crosby High School, Michael F. Wallace Middle School, John 
F. Kennedy High School, West Side Middle School, and H.S. Chase Elementary School
 – Wilton: Cider Mill School
In addition to HVAC upgrades, BL Companies has also provided full design services for new 
construction, renovations, and additions, including:
 – Meeting House Hill Elementary School (Additions and Renovations)
 – Mary M. Hooker Environmental Magnet School (New Construction)
 – New Haven Academy (Renovate-as-New)
• Facility Assessments: BL Companies regularly conducts equipment condition assessments, 
facility condition assessments, and property condition assessments. Recent examples 
include:
 – Madison Public Schools: HVAC, Electrical, and Fire Protection Assessments
 – Stonington High School: HVAC and Building Envelope Assessments

Page 74

BL Companies
– Coventry Public Schools: HVAC, Energy Efficiency, and Architectural Assessments
– Guilford Public Schools: HVAC and Electrical Assessments
– Connecticut Department of Transportation: MEP assessments for all DOT buildings and 
assets
– Connecticut Public Transit Authority: MEP assessments, recommendations, and cost 
estimating for all transit authority buildings
• Government and Judicial Facilities: BL Companies has delivered new construction, renovations, 
code compliance, energy upgrades, and HVAC improvements for various civic and judicial 
facilities, including:
– Litchfield Courthouse: Cooling Tower Study
– New Haven Courthouse: Chiller Replacement
– Stamford Courthouse: Chiller Replacement and Parking Garage (New Construction)
– Bridgeport Courthouse: AHU Replacement
– Hartford City Hall: Code, Energy, and HVAC Improvements
– Connecticut General Assembly: Boiler Plant Replacement
• Regulatory Agencies: BL Companies has extensive experience coordinating with regulatory 
bodies such as:
– Connecticut Department of Administrative Services (CTDAS)
– Bureau of School Facilities / Office of School Construction Grants
– Connecticut Department of Energy and Environmental Protection (CTDEEP)
– We are also highly experienced in designing to Connecticut High Performance Building 
Standards, with several successful projects including:

Page 75

SECTION IV 
Relevant Project Experience

Page 76

BL Companies 
Polson Middle School
Madison, CT
BL Companies provided mechanical, electrical, and plumbing design 
services for the 149,000 SF Polson Middle School.
Phase 1 of the renovation included verifying existing conditions and 
equipment, assessing heating and non-air-conditioned areas, conducting 
a detailed energy model, specifying three HVAC systems with analysis, 
evaluating the electrical power system, sizing a generator for the school, 
studying fire protection impacts, providing professional estimates, and 
evaluating geothermal system feasibility using existing wells for thermal 
testing. Schematic design was developed for a system compatible with 
the proposed HVAC.
Phase 2 included construction documents, bidding, and construction 
administration services to implement the selected improvements of new 
HVAC systems, electrical power upgrades, and auditorium renovation.
PROJECT FACTS
KEY SERVICES
Architecture 
MEP Engineering 
Structural Engineering

Page 77

BL Companies 
Fairfield Woods Middle 
School
Fairfield, CT
The Fairfield Woods Middle School project was a $16.1 million 
renovation of a 177,000 SF elementary school.
Mechanical, electrical, plumbing, fire protection, architectural, 
and structural design services associated with new and 
replacement HVAC systems to serve 80,000 SF of the school.  
New systems included packaged rooftop air-handling units, 
packaged dedicated outside air systems (DOAS), variable 
refrigerant flow (VRF) systems, building management system 
(BMS) upgrades throughout the facility, new electrical service, 
and structural modifications to support new mechanical 
equipment.  
PROJECT FACTS
KEY SERVICES
MEP Engineering
Fire Protection Engineering 
Structural Engineering 
Architectural Services 
Commissioning Support 
Construction Administration

Page 78

BL Companies 
North Stratfield 
Elementary School
Fairfield, CT
The North Stratfield Elementary School project was a 
$11.5 million renovation of a 61,000 SF elementary school.  
Mechanical, electrical, plumbing, fire protection, 
architectural, and structural design services associated 
with new and replacement HVAC systems to serve 51,000 
SF of the school.  New systems included packaged rooftop 
air-handling units, packaged dedicated outside air systems 
(DOAS), variable refrigerant flow (VRF) systems, building 
management system (BMS) upgrades throughout the facility, 
structural modifications to support mechanical equipment, 
new electrical service, new lighting, and new ceilings.  
PROJECT FACTS
KEY SERVICES
MEP Engineering
Fire Protection Engineering 
Structural Engineering 
Architectural Services 
Commissioning Support 
Construction Administration

Page 79

BL Companies 
Osborn Hill Elementary 
School
Fairfield, CT
The Osborn Hill Elementary School project was a $8.1 million 
renovation of a 55,000 SF elementary school. 
Mechanical, electrical, plumbing, fire protection, architectural, 
and structural design services associated with new HVAC 
systems to serve 32,000 SF of the school.  New systems 
included packaged dedicated outside air systems (DOAS), 
variable refrigerant flow (VRF) systems, building management 
system (BMS) upgrades throughout the facility, structural 
modifications to support mechanical equipment, new electrical 
service, new lighting, and new ceilings.  
PROJECT FACTS
KEY SERVICES
MEP Engineering
Fire Protection Engineering 
Structural Engineering 
Architectural Services 
Commissioning Support 
Construction Administration

Page 80

BL Companies 
Tomlinson Middle School
Fairfield, CT
The Tomlinson Middle School project was a $4.7 million 
renovation of a 167,000 SF middle school.  
Mechanical, electrical, plumbing, fire protection, 
architectural, and structural design services associated 
with new HVAC systems to serve 17,000 square feet of 
the school.  New systems included packaged rooftop 
air-handling units, building management system (BMS) 
upgrades, lighting, ceilings, and structural modifications 
to support mechanical equipment.  
PROJECT FACTS
KEY SERVICES
MEP Engineering
Fire Protection Engineering 
Structural Engineering 
Architectural Services 
Commissioning Support 
Construction Administration

Page 81

BL Companies 
Illing Middle School
Manchester, CT
The Illing Middle School project was a $3.3 million rooftop 
air-handling unit replacement at a 138,000-square-foot 
middle school. 
Services included full MEP engineering design for the 
replacement of existing rooftop air-handling units with custom 
multi-zone systems, coordination of new distribution and 
controls integration, and complete new HVAC systems to add 
air conditioning to the gym.
PROJECT FACTS
KEY SERVICES
Mechanical Engineering
Electrical Engineering
Plumbing Engineering

Page 82

BL Companies 
Ellington Schools
Ellington, CT
The Ellington School projects were a $13.1 million renovation 
of Center School, Ellington Middle School, and Ellington High 
School totaling 288,000 SF.
Mechanical, electrical, plumbing, architectural, and structural 
design services associated with HVAC system upgrades and 
replacement.  New systems included packaged dedicated 
outside air systems (DOAS) for ventilation, a complete 
replacement of the boiler plant consisting of boilers, pumps, 
hydronic components, and piping, building management system 
(BMS) to serve both new and existing equipment throughout 
the facility, structural modifications to support mechanical 
equipment, and ceilings as required to install new ductwork.   
PROJECT FACTS
KEY SERVICES
MEP Engineering
Structural Engineering 
Architectural Services

Page 83

BL Companies 
Fairfield Warde High School
Fairfield, CT
The Fairfield Warde High School project includes a $36 
million renovation of a 318,000 SF high school. 
Mechanical, electrical, plumbing, fire protection, architectural, 
structural, and civil design services associated with new 
HVAC systems to serve 142,000 square feet of the school.  
New systems included packaged rooftop air-handling units, 
packaged dedicated outside air systems (DOAS), variable 
refrigerant flow (VRF) systems, building management system 
(BMS) upgrades throughout the facility, electrical service, 
lighting, ceilings, and structural modifications to support 
mechanical equipment.   
PROJECT FACTS
KEY SERVICES
MEP Engineering
Fire Protection Engineering 
Structural Engineering 
Civil Engineering 
Architectural Services

Page 84

BL Companies 
Fairfield Ludlowe High 
School
Fairfield, CT
The Fairfield Ludlowe High School project includes a $55 
million renovation of a 307,000 SF high school. 
Mechanical, electrical, plumbing, fire protection, architectural, 
structural, and civil design services associated with new 
HVAC systems to serve 206,000 square feet of the school.  
New systems included packaged rooftop air-handling units, 
packaged dedicated outside air systems (DOAS), variable 
refrigerant flow (VRF) systems, building management system 
(BMS) upgrades throughout the facility, electrical service, 
lighting, ceilings, and structural modifications to support 
mechanical equipment.   
PROJECT FACTS
KEY SERVICES
MEP Engineering
Fire Protection Engineering 
Structural Engineering 
Civil Engineering 
Architectural Services

Page 85

BL Companies 
Walter Fitzgerald Campus
Fairfield, CT
The Walter Fitzgerald Campus project includes a $6 million 
renovation of an 18,000 SF high school.
Mechanical, electrical, plumbing, fire protection, architectural, 
structural, and civil design services associated with a new fire 
protection sprinkler system to serve the entire building, plus 
new HVAC systems to serve 5,500 square feet of the school.  
New systems include fire protection sprinkler system, fire 
water service, packaged rooftop air-handling units, building 
management system (BMS) upgrades, building management 
system (BMS) upgrades, electrical service, lighting, ceilings, and 
structural modifications to support mechanical equipment.   
PROJECT FACTS
KEY SERVICES
MEP Engineering
Fire Protection Engineering 
Structural Engineering 
Civil Engineering 
Architectural Services

Page 86

BL Companies 
Scofield Magnet Middle 
School
Stamford, CT
The Scofield Magnet Middle School project includes a $2.5 
million replacement of packaged rooftop air-handling 
units totaling 485 tons of cooling, upgrades to the building 
management system (BMS) throughout the facility, and 
installation of a new Music Room HVAC system at a 142,000 
square foot school. 
Project included mechanical engineering, electrical engineering, 
commissioning support, and construction administration 
services.  
PROJECT FACTS
KEY SERVICES
Mechanical Engineering 
Electrical Engineering 
Commissioning Support 
Construction Administration

Page 87

BL Companies 
Turn of River Magnet Middle 
School
Stamford, CT
The Turn of River Middle School project involved the 
replacement and renovation of the school’s boiler plant 
serving the heating hot water and domestic hot water 
systems at a 125,000 SF school.
Old cast-iron boilers, standard-efficiency domestic hot water 
heater, and constant volume pumps were replaced with new 
high-efficiency condensing boilers, condensing water heaters, 
and variable speed pumps.   
PROJECT FACTS
KEY SERVICES
Mechanical Engineering 
Electrical Engineering 
Plumbing Engineering 
Commissioning Support 
Construction Administration

Page 88

BL Companies 
Stonington High School HVAC 
Evaluation
Stonington, CT
BL Companies provided Mechanical, Retro-Commissioning, 
Building Energy Assessment, and Thermal Imaging services for 
Stonington Public Schools. 
This study identified HVAC, Building Management System, and 
Building Thermal Envelope deficiencies through thermal scans and 
equipment assessments.  Recommendations included replacement 
parts, refurbishment specs, and modernization options.  BL 
Companies helped the Town develop a phased plan for addressing 
these issues, supporting a comprehensive capital improvements and 
maintenance strategy.
PROJECT FACTS
KEY SERVICES
Energy Efficiency
MEP Engineering
Cost Estimating

Page 89

BL Companies 
Mystic / Stonington Middle 
School
Mystic, CT
BL Companies provided mechanical, electrical, and plumbing 
design services for the 85,000 SF Mystic / Stonington Middle 
School. 
The scope of work included new Dedicated Outside Air Systems 
(DOAS) for ventilation, Variable Refrigerant Flow (VRF) systems 
for heating and cooling, Rooftop Units (RTU) for heating, cooling, 
and ventilation of the gym and café, associated duct & piping 
systems, and a new electrical service including 2000A switchboard, 
distribution panels, and associated equipment.
PROJECT FACTS
KEY SERVICES
MEP Engineering
Architecture
Structural Engineering

Page 90

SECTION V 
Fee Proposal

Page 91

BL Companies
Fee Proposal
PHASES TASKS FIXED FEE
Phase I Investigation $27,500
Phase 2 Design & Engineering (Design Development - 50% Complete) $52,500
Design & Engineering (Construction Documents - 100% 
Complete)
$60,000
TOTAL $140,000

Page 92

 
 
 
 
CT 
 
 
 
H2M Architects, Engineers, Geology, Land Surveying and Landscape Architecture, DPC (NY) offers its services in NY only  
H2M Architects & Engineers, Inc. (NJ) offers its services in NJ, CT, DE, FL, LA, MA, PA, RI, SC, VA only 
H2M Associates, Inc. (NJ) offers its engineering, land surveying, landscape architecture services in NJ only  h2m.com 
October 13, 2026 
 
Mr. Michael P. Walsh 
Granby Town Manager 
15 N. Granby Road 
Granby, CT 06035 
 
Re:    Proposal for Granby Middle School HVAC Replacements  
H2M Proposal No.: LP262054 
  
Dear Mr. Walsh: 
 
H2M Architects & Engineers, Inc. (H2M) is pleased to provide this proposal in response to the Granby Public 
School (GPS) RFP/BOS Resolution received approximately September 24, 2026, and subsequent FCA report 
dated 2026 to design the replacement of various HVAC systems at the Middle School. The MEP design 
services to be provided includes evaluation of the scope of work items identified in the 2026 Studio Jaes report 
and development of construction documents of the highest priority selected equipment. Our project 
understanding and deliverables are further described as follows. 
PROJECT UNDERSTANDING 
Based on the RFP, it is our understanding that most of the HVAC systems under consideration for replacement 
are original to the building and have exceeded their useful life expectancy. The equipment is on the order of 
34 years old and replacement parts are difficult or impossible to obtain. In many cases, the rooftop unit fresh 
air dampers are set below minimum ventilation, not operating or stuck closed, providing insufficient ventilation 
air to the spaces served. VAVs are not consistently responding to controls, further negatively impacting 
occupancy comfort and health. It was stated during the walk-through that the band and chorus rooms exhibit 
high humidity suspected as the result of oversized rooftop units. The Honeywell Niagara building management 
system is also in need of replacement. 
Based on the preliminary information provided, it can be deduced that the building is likely highly negatively 
pressurized due to insufficient fresh air supply from the rooftop units. With the toilet exhaust fans operating, 
this results in un-tempered (in the winter) and non-conditioned air to infiltrate the building. Cold drafts in the 
winter can cause pipe freeze-ups and humid air infiltration in the summer will lead to uncontrolled high humidity 
and possible mold growth. Furthermore, if MERV-13 filters were installed in the rooftop units in response to 
COVID without rebalancing the units, the associated spaces likely have insufficient air change rates, further 
reducing the ability of the HVAC system to dilute and remove odors, humidity, and germs. 
Our team understands that the success of this project relies on integration of the existing infrastructure and 
distribution with new modern mechanical, electrical, and control technology systems. The design must provide 
safe, healthy, and energy-efficient environments within the established construction budget. The project will 
require careful assessment of existing systems, verification of available capacities, and development of 
engineering solutions that support both operational requirements and long-term reliability.  
H2M has the in-house capability to conduct a variety of field testing to verify existing conditions. Although GPS 
has provided the 1991 bid drawings, we do not simply rely on this information to be accurate, nor as-built. 
H2M performs extensive field surveys to develop accurate existing conditions plans to mitigate the possibility 

Page 93

H2M Proposal #262054 
October 13, 2026 
Page 2 of 8  
 
of unforeseen problems during construction. Aside from geometric and observable physical characteristics, 
H2M also deploys special tools to confirm system operation, including but not limited to: 
1. Ultrasonic Hydronic Flow Measurement 
This is a non-destructive tool that is used to measure flow in piping. 
For this school specifically, it will be imperative to understand the 
current heating hot water flow to air handling units to confirm the 
central pumps and distribution are properly balanced to support the 
new units once installed. During design, the flow data will be used 
as a diagnostic tool to help identify additional work that may be 
required. The construction documents will require system balancing 
by a certified third-party balancer. 
2. Turbine and Flow Hood Measurement 
This is a non-destructive tool used to measure air flow at duct 
outlets/returns (hood) and at fans or other in-line points (turbine). For this 
project, and typically for most, we perform specific airflow measurements 
in specific areas of concern to help identify if the observed conditions are 
a result of poor airflow, supply air temperature, and control (in 
conjunction with next item), space pressurization. Similar to above, this 
is used as a diagnostic tool to help identify additional work that may be 
required. The construction documents will require system balancing by 
a certified third-party balancer. 
3. Temperature and Humidity Data Loggers 
These small portable devices (the size of flash 
drives) can be deployed throughout various spaces 
and record temperature and humidity and generate 
trended logs to help identify control and capacity 
issues. This removed subjective opinions about 
conditions and provides hard data that can be used 
to resolve issues. 

Page 94

H2M Proposal #262054 
October 13, 2026 
Page 3 of 8  
 
4. Thermal Imaging and 3D Scanning 
Thermal imaging is an invaluable tool to locate 
drafts in negatively pressurized buildings and 
leaks or deteriorated insulation behind walls and 
underground. This can reduce the risk of pipe 
freezing and optimize thermal efficiency. 
3D scanning is deployed to provide accurate 3D 
data point (clouds) of spaces later referenced 
during design. 
5. Energy Modelling and Load Calculations 
In addition to energy modelling, for which H2M uses Carrier HAP (which is DOE, ASHRAE std. 140 
and 90.1 approved), we can perform a screening analysis of the selected systems to better understand 
how they impact CO2 emissions vs. energy cost. The CO2 analysis has been specifically developed 
for the NYC Local Law 97 carbon reductions but is applicable to all systems (with or without emissions 
penalty considerations).  
 
 
 
 
 
 
 
  

Page 95

H2M Proposal #262054 
October 13, 2026 
Page 4 of 8  
 
Equipment replacement of the rooftop units cannot be achieved with ‘in kind’ selections. Changes to the 
energy code will require replacement units to be provided with energy recovery. This results in a larger 
equipment footprint and different duct connections, curbs and dunnage (as applicable) will require 
replacement, evaluation, and below-roof duct mains will require partial demolition and rework to mate with the 
new equipment. 
While more efficient overall, new equipment using R454 or R32 refrigerant operates at higher pressure and 
frequently requires larger circuit ampacity. This will require review of existing electrical panels, breakers, 
feeders, and disconnects to confirm if they can be reused, or require replacement. 
From an engineering perspective, our understanding is that an assessment of existing infrastructure will be 
required to determine available mechanical, electrical, plumbing, and fire alarm capacities.  
The evaluation, equipment selection, and design will include detailed space ventilation calculations in 
accordance with applicable ASHRAE62.1 standards as referenced in the Connecticut Mechanical Code. The 
ventilation review will include terminal device locations to define ventilation efficiency in conjunction with the 
space and occupancy requirements. The need for MERV-13 filtration will be reviewed with the School. 
The electrical design will include evaluation of the existing electrical service in support of the HVAC equipment 
replacements.  The existing fire alarm system will accommodate the new fire alarm shutdown and interface 
modules. 
Plumbing design is limited to miscellaneous piping as required in support of the HVAC and food warming 
equipment replacement. Due to the $3M budget constraint, the installation of a building fire protection system 
is not included at this time. 
The following is anticipated to be required and provided. The base scope of work included in this scope of 
work is the Priority 1 (D30) HVAC items (P1) identified in the 2026 Jaed Report (see Appendix A), and as 
noted otherwise below. 
Mechanical Design 
1. Perform field review of existing conditions. 
2. Document existing conditions as required for demolition and new work. 
3. Develop demolition and construction documents, including: 
a. Demolition plans including ductwork and piping (as required to fit up to new equipment). 
b. Construction plans to include: 
i. Supply, return, and exhaust ductwork to reconnect to new equipment. 
ii. New cabinet heaters 
iii. Air flow and pressurization diagrams 
iv. Piping diagrams to reconnect to new equipment. 
c. Control diagrams with control sequences 
d. Equipment schedules 
e. Construction details 
f. Technical specifications on drawings  
g. Submittal requirements 
 
  

Page 96

H2M Proposal #262054 
October 13, 2026 
Page 5 of 8  
 
Electrical/Fire Alarm Design 
1. Perform field review of existing conditions for scope of work equipment as required. 
2. Design of power to include: 
a. Demolition of existing circuits back to breaker panels. 
b. New circuity for new HVAC equipment 
c. New fire alarm devices associated with equipment replacements. 
 
General Design 
1. Perform field review of two existing food warming stations as required. 
2. Specify and design replacement in kind. 
 
PROJECT EXECUTION 
Phase 1: Pre-Design / Field Survey / Schematic Design 
H2M will perform the following scope of work to gain a full understanding of the project requirements:  
 
▪ Meet with GPS and stakeholders to confirm project requirements and goals  
▪ Field survey and document existing conditions  
▪ Review existing available reports, documentation, and drawings  
▪ Review power sources to supply new equipment from existing panels 
 
 Deliverables: 
▪ Design Narrative 
▪ Schematic design plans/sketches as required for design direction.  
▪ Develop Schematic Design Cost Opinion 
 
Meetings: 
▪ Kick-off meeting 
▪ Scope review meeting 
 
Phase 2: Design and Construction Documents 
Develop 60% design documents based on the GPS review and comments issued for Phase 1. 
Review 60% documents with GPS, then proceed to develop 100% construction documents. 
 
Mechanical Documents 
▪ Prepare drawings and technical specifications 
▪ Demolition plans 
▪ Construction plans, including equipment locations and piping plans 
▪ Equipment schedules 
▪ Construction details 
 
Plumbing Documents 
▪ Prepare drawings and technical specifications 
▪ Piping demolition and construction plans 
▪ Construction details 
 

Page 97

H2M Proposal #262054 
October 13, 2026 
Page 6 of 8  
 
Electrical Documents 
▪ Design of power and circuiting for new equipment 
▪ Design of fire alarm integration of new equipment  
▪ Voltage drop calculations for new equipment wiring as needed 
▪ Coordination of wiring and conduit from panel boards to new equipment 
 
Deliverables: 
▪  60% Design Development Documents and updated cost opinion 
▪  100% Construction Documents (Signed and Sealed for Permit Submission) 
 
Meetings: 
▪ It is anticipated that three meetings will be held during this phase.  
 
 
KEY STAFF 
The following key project team members will be involved in this project with supplemental staff as required. 
This team is highly experienced in this type of work and has worked together for over 10 years on similar 
projects. The Mechanical Discipline Lead selected for this team, Paul Foerth, is a Licensed Professional 
Engineer in multiple states (including Connecticut), a Certified Energy Manager (CEM), and has over 15 years’ 
experience specializing in HAVC projects. Alexander Hochhausl, with over 30 years of experience will provide 
technical assistance and quality control as Subject Matter Expert. Shannah Sherman has close to 15 years 
mechanical engineering expertise in HVAC systems and is a CEM. She will be the lead mechanical engineer 
and has support staff to execute the mechanical design. Electrical engineering support will be provided by 
Charlie Starke (Licensed Professional Engineer in Connecticut) who has 15 years’ experience in electrical 
design projects, along with his support staff. 
▪ Client Contact/Principal-in-Charge: Gregory Levasseur, P.E. 
▪ Subject Matter Expert: Alexander Hochhausl, P.E.  
▪ Mechanical Discipline Lead: Paul Foerth, P.E., CEM 
▪ Mechanical Project Engineer: Shannah Sherman, P.E., CEM 
▪ Electrical Engineer: Charlie Starke, P.E. 
We have included their resumes in Attachment C for your reference. 
PRELIMINARY DELIVERABLES SCHEDULE  
H2M proposes to provide the services noted above within the working days listed in the Notice to Proceed for 
each phase.  Durations represent active consultant effort and exclude durations associated with Town review 
and approval cycles, which shall be governed by Town. 
Phase Working Days 
Phase 1 – Pre Design / Field Survey / Schematic Design  30 
Phase 2 – Design and Construction Documents 60 
  

Page 98

H2M Proposal #262054 
October 13, 2026 
Page 7 of 8  
 
PROFESSIONAL FEES 
Please see below for a breakdown of proposed fees per Phase. 
 
TASK Description Type Total Cost 
Phase 1 Pre Design / Field Survey / Schematic Design Lump Sum  $29,780  
Phase 2 Design and Construction Documents Lump Sum $102,520 
Subtotal Engineering Design Phase  . . . $132,300 
 
The above fees are based on the replacement of the P1 scope of work items listed in Attachment A. Additional 
scope of work items can be added with an additional fee based on 4.5% of the estimated construction cost. 
RATE SCHEDULE 
The above services are to be provided as Lump Sump. For any additional hourly services, the following rate 
schedule will apply. 
Billing Category  Hourly Billing Rate 
PIC/Subject Matter Expert $ 259.00 
Project Manager   $ 242.00  
Project Engineer   $ 190.00 
Staff Engineer   $ 150.00 
Administrative Support  $ 104.00 
 
PROPOSAL ASSUMPTIONS / CLARIFICATIONS 
▪ Existing electrical service has sufficient space and capacity for new loads. Electrical service/distribution 
upgrade will not be required. 
▪ Existing fire alarm control panel has sufficient space and capacity for new devices. Replacement of fire 
alarm control panel will not be required. 
▪ It is anticipated that the existing building roof structure has sufficient capacity to support rooftop 
equipment. H2M has included structural analysis and design of localized re-enforcement of openings, 
curb bases, or existing dunnage modifications. Structural analysis or reinforcement of roof framing is 
excluded from base services. 
▪ No changes to existing space partitions, function or occupancy. 
▪ LEED, green buildings, or rebate programs/applications are excluded. 
▪ Alternate energy (geothermal, solar/PV, wind, etc.) systems are excluded. 
▪ No emergency, backup power is required. 
▪ Fire protection (sprinkler system) design is not included in the current scope of work. 
▪ Documents will be issued for one round of technical and code review comments. 
 
SERVICES NOT INCLUDED IN THIS PROPOSAL 
▪ Any work not specifically outlined above 
▪ Bidding, permitting, construction administration/support services 
▪ Destructive or third-party testing, analysis, or laboratory testing/services 
▪ Troubleshooting of existing systems outside of the scope of work equipment 
▪ Space lighting and controls 
▪ Tel/Data/IT cabling and final termination design 
▪ Construction cost estimating and value engineering 

Page 99

H2M Proposal #262054 
October 13, 2026 
Page 8 of 8  
 
▪ Air or hydronic testing and balancing  
▪ Hazardous materials testing and abatement 
▪ Main electrical service upgrade and/or replacement 
▪ Fire alarm control panel upgrade and/or replacement 
▪ Construction phasing and temporary services 
▪ As-built plans 
▪ Front end and Division 1 documents, contracts, and contractor insurance requirements 
▪ Should meetings beyond those listed above be desired, H2M will provide an additional services 
proposal for this work. Additional services will be agreed upon in writing prior to the commencement of 
work.  
 
PROPOSAL STIPULATIONS 
The offer to perform the above services shall remain open for ninety (90) days from the date of this proposal. 
Any extensions of this proposal shall be in writing only. 
 
We appreciate the opportunity to work with Granby Public Schools on this project.  In the meantime, should 
you have any questions, comments, or require further information regarding this proposal or any aspect of the 
project, please feel free to contact me at 860.607.9011 x1034 or via email at glevasseur@h2m.com. Thank 
you for your consideration. 
 
Respectfully Submitted, 
H2M Architects & Engineers, Inc. 
 
 
 
 
Gregory J. Levasseur, P.E.    Alexander Hochhausl, P.E.     
Vice President, Windsor Office Director  Vice President, Mechanical Discipline Lead  
              
SJB/EVI/JLM/ML/AWK 
 
CC: H2M_File 
 
Attachments: 
 Attachment A - HVAC Equipment Scope 
 Attachment B – H2M Standard Terms and Conditions 
Attachment C – Team Resumes 
 
J:\PROPS\2026\262054 (T.Granby-Eng Svcs-Athletic Fields) Muni-CT\02 Working Files\MEP Proposal Request\LP262054 Granby MS HVAC-
GJL.docx 

Page 100

Code Corrective Action Quantity Priority Correction Notes Estimated Cost
D3030-04-04C Condensing Unit (20 Tons) Replacement CU-2 1 P1 CU-2 18 Tons connected to RTU-5 73,598$                
D3030-04-05C Condensing Unit (30 Tons) Replacement CU-4 1 P1 CU-4 25 Tons connected to RTU-7 100,311$              
D3030-04-10C Condensing Unit (80 Tons) Replacement CU-1 1 P1 CU-1 71 Tons connected to AH-1 196,632$              
D3040-02-20C AHU Heating Only (2000 CFM) RTU-1 1 P1 RTU-1 53,922$                
D3040-02-22C AHU Heating Only (4000 CFM) RTU-8 1 P1 RTU-8 69,850$                
D3040-02-25C AHU Heating Only (7000 CFM) RTU-3 1 P1 RTU-3 134,900$              
D3040-02-25C AHU Heating Only (7000 CFM) RTU-2 1 P1 RTU-2 134,900$              
D3040-13-08C Exterior Ductwork & Insulation Replacement 100 SF P1 Connected to RTU-7 10,637$                
D3050-01-06C Packaged Rooftop Unit RTU-6 1 P1 13 Tons 89,563$                
D3050-19-01C Cabinet Heater 10 P1 135,552$              
D3060-02-03C Electronic Control (DDC) System 55055 SF P1 Honeywell Niagara 1,155,900$          
D3060-03-02C Local Control System to DDC 18352 SF P1 360,172$              
P1 Sub Total : 2,515,937$          
Code Corrective Action Quantity Priority Correction Notes Estimated Cost
D3030-04-04C Condensing Unit (20 Tons) Replacement CU-3 1 P2 CU-3 13 Tons connected to RTU-6 73,598$                
D3040-01-03C Supply Fan (2 HP) 1 P2 SF-2 1.5 HP 15,743$                
D3040-02-15C Air Handling Unit (75 Tons) AH-1 1 P2 AH-1 71 Tons 348,366$              
D3040-02-23C AHU Heating Only (5000 CFM) RTU-4 1 P2 RTU-4 82,413$                
D3040-02-24C AHU Heating Only (6000 CFM) AH-2 1 P2 AH-2 95,838$                
D3040-02-24C AHU Heating Only (6000 CFM) AH-3 1 P2 AH-3 95,838$                
D3040-02-25C AHU Heating Only (7000 CFM) AH-4 1 P2 AH-4 134,900$              
D3040-02-25C AHU Heating Only (7000 CFM) AH-5 1 P2 AH-5 134,900$              
D3040-04-01C VAV Terminal Unit 8 P2 62,861$                
D3040-04-03C VAV Terminal Unit with HW Reheat 20 P2 208,056$              
D3040-07-03C Return Air or Inline Fan (3 HP) 4 P2 RAF-2,3,4,5 83,730$                
D3040-07-07C Return Air or Inline Fan (15 HP) 1 P2 RAF-1 44,351$                
D3040-09-03C Exhaust Fan (1/5 HP) 5 P2 EF-2,3,9,13,15 43,732$                
D3040-09-05C Exhaust Fan (1/2 HP) 1 P2 EF-4 9,335$                  
D3040-09-05C Exhaust Fan (1/2 HP) 2 P2 EF-9 & 12 18,669$                
D3040-09-05C Exhaust Fan (1/2 HP) 2 P2 EF-6 & 10 18,669$                
D3040-09-07C Exhaust Fan (3/4 HP) 3 P2 EF-5,8,11 33,219$                
D3040-09-09C Exhaust Fan (1 HP) 1 P2 EF-1 9,293$                  
D3040-13-04C Ductwork & Insulation Cleaning Building Wide 73406 SF P2 BLDG SF 273,125$              
D3050-01-07C Packaged Rooftop Unit RTU-5 1 P2 18 Tons 130,039$              
D3050-20-04C Steam & Hot Water Unit Heater (200 MBH) 6 P2 53,560$                
D3050-21-11C Ductless Split System Heat Pump (1.5 Ton) 1 P2 Mitsubishi 7,895$                  
D3050-21-12C Ductless Split System Heat Pump (3 Ton) 1 P2 Mitsubishi 17,986$                
D3050-26-01C Fin-Tube Radiation 922 Units P2 410,567$              
D3090-06-01C Industrial Air Cleaner 2 P2 Airomax 12,611$                
P2 Sub Total : 2,419,294$          
Code Corrective Action Quantity Priority Correction Notes Estimated Cost
D3050-01-08C Packaged Rooftop Unit RTU-7 1 P3 25 Tons 233,667$              
D3090-01-01C Dust Collection System 1 P3 Donaldson 5,487$                  
D3040-10-01C Roof Mounted Gravity Vent 5 P3 38,430$                
D3040-09-11C Exhaust Fan (3 HP) 1 P4 KEF-1 Cook 12,765$                
D3040-01-01C Supply Fan (.5 HP) 1 P4 Cook Supply for KEF-1 10,820$                
P3 & 4 Sub Total : 301,169$              
Note: Red Font indicates note on report to change to priority shown.
Scope of Work Recommendations per Studio Jaed Report Dated 2026
Appendix A

Page 101

(Ver 210520) 
H2M Standard Terms & Conditions 
 
Page 1 of 4 
 
Client  
Site  
Services  
 
Client’s Rep.  H2M’s Rep.  
Phone/E-Mail  Phone/E-Mail  
 
1. Applicability of Terms and Conditions. 
1.1. Applicable to Scope of Services. The scope of services, pricing 
and schedules included with H2M’s proposal are contingent upon the 
Client accepting the terms and conditions (“Standard T&C”) herein. Any 
changes hereto which affect H2M’s rights, obligations, or risk exposure 
shall entitle H2M to make appropriate adjustments to its pricing and 
proposal.  
1.2. Applicable to Preliminary Services. These Standard T&C shal l 
also apply to any services H2M performs prior to the Parties executing a 
written Contract.  In such circumstances, Client’s direction to H2M to 
render services shall constitute acceptance of these Standard T&C. 
2. Authority of Signers and Parties. 
2.1. Authority to Contract . The individuals signing the Contract each 
warrant that s/he is empowered to sign on behalf of and bind the 
indicated Party to these Standard T&C and all other components of the 
Contract.  
2.2. Authority for Project. Client warrants that it has any authority and 
permission required from Owner to engage H2M in the Services 
concerning the Site, and to grant H2M physical access to the Site as 
needed to perform the Services. 
3. Contractual Obligations 
3.1. Designated Representative. Each Party shall designate a 
“Representative” in writing above. Each Representative shall have the 
authority to transmit and receive instructions and other information, and 
to render interpretations and decisions concerning the Project and 
Contract on behalf of the Party s/he represents. Each Party is entitled to 
rely on communications from the other Party’s Representative as 
authoritative. Each Representative shall issue decisions, interpretations 
and communications promptly as to avoid unreasonable delays in 
delivery of the Services. 
3.2. Commencement. H2M is not obligated to commence or continue 
rendering any Services until both Parties have signed the Contract and 
Client has paid any required Fee advance specified in the proposal. 
3.3. Performance Standards. Each Party shall exercise its rights and 
perform its obligations in a reasonable and non- negligent manner. H2M 
shall perform its Services within the Standard of Professional Care. Client 
shall pay compensation for all Services so rendered. H2M makes nor 
implies any other warranties or guarantees, herein or otherwise, 
concerning the Services or the outcome of the Project.  
3.4. “Standard of Professional Care” means the standard of care and 
skill recognized by law to apply to licensed professionals practicing the 
same profession, under the same circumstances, at the same time and 
location, as the Services rendered by H2M. Nothing in any part of the 
Contract is intended, nor shall anything be so interpreted as, to elevate 
the Standard of Professional Care beyond the definition included here.  
3.5. Document Ownership. All information (including but not limited to 
drawings and specifications) developed by H2M are instruments of 
service only, and not products produced for sale nor works made for hire. 
H2M reserves all of its copyright, ownership and other rights with respect 
to such information. Client shall not modify and shall not apply such 
information outside of the Project or for any purposes other than that for 
which it was created. Client shall defend and indemnify H2M against any 
claims, liabilities and costs associated with such unauthorized treatment 
of the information. Client may reuse the information for authorized 
purposes only with advance written consent from H2M that details the 
scope of, additional compensation for, and appropriate protections 
associated with such reuse. 
3.6. Site Access. Client guarantees full and free H2M access to the Site 
and shall cooperate with H2M in gaining access to any other real property 
required for the performance of the Services. 
3.7. Preliminary Information. Client shall provide to H2M in writing any 
pertinent information it possesses that might affect the Project 
requirements (including but not limited to design objectives and 
constraints, budgetary limitations, surveys, related reports and studies, 
environmental, geotechnical, and soil data, preliminary designs, etc.). 
H2M is entitled to rely on the accuracy of all information that the Client 
provides. H2M shall not be required to verify any such information, unless 
such task and information is specifically listed in the Scope of Services. 
3.8. Hazardous Materials.  Client warrants that to the best of its 
knowledge there are no constituents of concern on or adjacent to the 
Site, other than those previously disclosed in writing to H2M. Nothing in 
this Contract shall be interpreted to give H2M responsibility for the current 
existence or introduction (including by, but not limited to, dispersal, 
discharge, escape, release, or saturation, either sudden or gradual) to 
the Site of any hazardous materials (including but not limited to smoke, 
vapors, soot, fumes, acids, alkalis, toxic chemicals, liquids, or gases) by 
anyone other than H2M. Client shall therefore hold H2M harmless as to 
all such matters.  
3.9. Claims Assistance. H2M shall be entitled to hourly compensation 
as Additional Services for all time spent analyzing, preparing, testifying, 
and otherwise assisting Client to pursue or defend claims and disputes 
to which H2M is not a named plaintiff or defendant.  
4. Payment Terms  
4.1. Fees. The “Fees” are the component of compensation to be paid by 
Client to H2M for its effort in providing the Services. The Fees pertaining 
to this Contract, are set forth in the proposal, and any Amendments to 
the Contract. Additional services, when required will be invoiced at hourly 
rates of compensation or a negotiated lump sum, plus reimbursable 
expenses.  
4.2. Reimbursable Expenses.  The “ Expenses” are the costs H2M 
incurs in rendering the Services which are to be reimbursed by Cli ent. 
Expenses authorized by this Contract include but are not limited to: 
4.2.1. Transportation, lodging and subsistence incidental to the project, 
courier charges, reproduction, renderings or models, specialty field 
equipment and fees paid for securing approval of authorities having 
jurisdiction over the project; 
APPENDIX B (4 PAGES)

Page 102

(Ver 210520) 
 Page 2 of 4 
4.2.2. Sub-contractor expenses, plus a ten (10) percent mark -up to 
compensate H2M for its handling and administration costs; 
4.2.2. Any other expenses set forth in the proposal. 
4.3. Taxes. The amount of any sales, excise, value added, gross 
receipts or any other type of tax that may be imposed by any taxing entity 
or authority shall be paid by Client in addition to the Fees and Expenses. 
4.4. Invoices. H2M shall provide invoices to Client for al l Fees and 
Expenses due under this Contract. Payment of invoices shall not be 
contingent upon the action of any third party. Client shall pay each invoice 
within thirty (30) days of the invoice date. 
4.5. Interest on Past Due Amounts. Invoices, Fees, and Expenses will 
be past due as of the thirty first (31st) day following the date of the 
invoice. All past due amounts shall accrue interest at the maximum rate 
permissible by law until the date upon which they are finally paid. 
4.6. Required Fee Advance. As security against the risks and costs of 
mobilizing to commence performing the Services, H2M may require a 
Fee advance. Any such Fee advance will be specified in the proposal . 
The fee advance will be deposited upon receipt and booked as an 
outstanding credit against accounts receivable from the Client.  The Fee 
advance will be applied to Client’s final invoice. 
5. Project Risk Management  
5.1. Mutual Waiver.  Except as otherwise specifically provided for in 
these T&C , neither Party shall hold the other responsible for any 
consequential damages, nor any damages other than direct damages. 
5.2. Mutual Indemnification. Subject to the applicable concepts of 
contributory and comparative fault, and in addition to any other 
compensation provided by law or this C ontract, each Party shall 
indemnify the other Party’s “Indemnitees” (the Party, its owners, 
directors, officers, employees and volunteers) against third- party claims 
and liabilities (including the reasonable costs of defending such claims) 
for death, bodily-injury, and property damage, but only to the extent such 
have been caused by the negligence of the indemnifying Party (including 
its owners, directors, officers, employees, volunteers, and those 
contractors for whom it is legally responsible), and not to the extent such 
are caused by any other means (including but not limited to the 
negligence of the Indemnitees themselves). 
5.3. Insurance Coverage. H2M shall maintain the following insurance 
coverage while performing the Services. Upon request, H2M will provide 
a Certificate of Insurance to Client as Certificate Holder reflecting such 
coverage. 
5.3.1. Workers’ Compensation and Disability coverages with limits at 
least in the amount required by law. 
5.3.2. Employers’ Liability coverage with policy limits not less than one 
million dollars ($ 1,000,000) each accident, one million dollars 
($1,000,000) each employee, and one million dollars ($1,000,000) policy 
limit.  
5.3.3. Automobile Liability coverage for H2M owned and non- owned 
vehicles utilized in performance of its Contract obligations, meeting 
statutorily required coverage, and with policy limits not less than one  
million dollars ($1,000,000) each accident for bodily injury, death of any 
person and property damage. 
5.3.4. Commercial General Liability coverage with policy limits of not 
less than one million dollars ($ 1,000,000) each occurrence and two  
million dollars ($2,000,000) in the aggregate for bodily injury and property 
damage.  
5.3.5. Professional Liability coverage for negligent acts, errors and 
omissions in the performance of professional services with policy limits 
of not less than one million dollars ($1,000,000) per claim and one million 
dollars ($1,000,000) in the aggregate. 
5.3.6. Pollution Liability coverage with policy limits of not less than one 
million dollars ($ 1,000,000) per claim and one million dollars 
($1,000,000) in the aggregate, whenever such would apply to H2M’s 
Services. 
5.4. Additional Insured Coverage. Client shall be covered as 
Additional Insured under the terms of H2M’s Commercial General 
Liability policy. 
5.5. LIMITATION OF H2M LIABILITY.  H2M’s AGGREGATE LIABILITY 
FOR ALL CLAIMS ARISING FROM AND/OR RELATED TO THIS 
CONTRACT, THE SERVICES, THE PROJECT, AND/OR THE SITE, 
SHALL BE LIMITED TO THE GREATER OF THE AMOUNT OF FEES 
PAID UNDER THIS CONTRACT OR FIFTY THOUSAND DOLLARS 
($50,000.00).  
6. Dispute Resolution 
6.1. Notice of Claim or Dispute. An aggrieved Party shall give the other 
Party written notice of any claim or dispute arising from the Project, the 
Services, or this Contract. The Parties shall endeavor in good faith to 
resolve such matters fairly and amicably through negotiation. If the matter 
has not been resolved by negotiation within thirty (30) days of receipt of 
such written notice, either Party may demand mediation of the matter.  
6.2. Mediation. Unless the Parties agree to other rules, any mediation 
shall be conducted under the auspices of the American Arbitration 
Association (AAA), pursuant to its Construction industry mediation rules. 
Each Party shall bear its own mediation costs (except as specified in the 
rules, and except that the AAA fees, mediator fees, and if agreed the 
venue fees, shall all be borne equally by the Parties). Except as 
otherwise specifically permitted herein, a prospective plaintiff Party may 
not file an action before giving the other Party ten (10) day’s written notice 
and opportunity to demand mediation. Such notice, and a good faith effort 
in any mediation timely demanded, shall be a condition precedent to the 
prospective plaintiff Party commencing litigation.  
6.3. Waiver of Jury Trial. The Parties hereby waive any and all rights to 
a trial by jury in any litigation pertaining to the Services or this Contract. 
6.4. Certificate of Merit. As a condition precedent to filing any pleading 
containing a cause of action based on professional liability, Client must 
include a sworn Certificate of Merit from a similarly licensed professional 
explaining the applicable Standard of Professional Care and alleging the 
specific acts or omissions by which H2M violated the Standard. 
6.5. Suspension of Services. Upon ten (10)  days written notice, H2M 
may suspend delivery of the Services until any past due invoice is paid. 
Client shall hold H2M harmless for the impact of any such suspension. 
6.6. Collection Efforts. Upon ten (10) days additional written notice, 
H2M may refer any past due invoice to inside or outside counsel for 
collection. H2M is entitled to reimbursement by Client for the time and 
cost involved in such collection efforts. 
6.7. Liquidated Damages. Since the actual costs that H2M will suffer in 
such collection efforts is difficult to ascertain, the Parties agree that Client 
will pay H2M the following amounts as liquidated damages for such 
costs: two hundred dollars ($200.00) when H2M refers a past due invoice 
for collection; plus either an additional six hundred dollars ($600.00) 
when a collection action is filed in small claims court, or an additional two 
thousand dollars ($2,000.00) when a collection action is filed in any other 
court. These liquidated damages are H2M’s only remedy to recover such 
costs of collection. 
6.8. Payment Disputes. H2M’s collection efforts are not subject to the 
mediation requirements set forth above. In disputing any invoice, Client 
shall adhere to the Mediation and Certificate of Merit requirements set 
forth above. 

Page 103

(Ver 210520) 
 Page 3 of 4 
6.9. Project Suspension. Upon seven (7) days’ written notice to H2M, 
Client may suspend the Project for any reason. If the aggregate number 
of Project suspension days exceeds sixty (60) days, such will constitute 
cause for termination. 
6.10. Termination. Either Party may terminate this Contract for cause 
if the other Party substantially fails to perform its obligations or otherwise 
breaches a material term of this Contract. Such termination will only be 
effective upon seven (7) days’ written notice and opportunity to cure. This 
Contract may also be terminated by the Client without cause by providing 
H2M thirty (30) days written notice. If this Contract is terminated H2M 
shall be entitled to invoice and to be paid for any Services performed 
prior to the termination. Notwi thstanding any other provisions of the 
Contract, if H2M terminates this Contract for cause, in addition to  any 
direct damages for breach of contract, it shall be entitled to recover from 
Client any expenses demonstrably attributable to termination  
7. Definitions (additional definitions indicated by quotes in context). 
7.1. “Client” means the person/entity for which H2M is obliged to 
perform the Scope of Services set forth in the Contract (and/or for which 
H2M performs services described in 1.2. above). Client and H2M are 
each individually a “ Party” and are collectively the “ Parties” to the 
Contract.  
7.2. “H2M” means the entity appropriately authorized to offer and render 
the services contained in the proposal and Contract. Specifically H2M 
Associates, Inc.; H2M Architects & Engineers, Inc.; or H2M Architects, 
Engineers, Land Surveying and Landscape Architecture, D.P.C. (d/b/a 
H2M architects + engineers), as appropriate. No proposal is intended as, 
and none should be interpreted to be, an offer to provide any services in 
any location where H2M is not authorized to provide such services. 
7.3. “Contract” means the written agreement by which H2M is obligated 
to perform services for the Client, and includes all components specified 
in the proposal or otherwise incorporated by written reference.  
7.4. “Services” means those services H2M is required by the Contract 
to perform for the Client, as such are reflected in the agreed “Scope of 
Services” set forth in the proposal and any amendments thereto agreed 
by the Parties in writing. 
7.5. “Project” means the Client’s overall endeavor at the Site, of which 
H2M’s Scope of Services is a component. 
7.6. “Site” means the real property to which the Project pertains, or 
where components of the Project are being built or disposed. 
7.7. “Owner” means the owner(s) of the Site, whether or not such owner 
is also the Client. 
7.8. “Contractor” means any person or entity (including the employees 
and subcontractors at every level thereof), other than H2M (including 
H2M’s own employees and subconsultants), that provides materials 
and/or services for the Client relating to the Project or the Site. Any 
licensed professional or firm engaged by a Contractor, or by the Client 
directly (rather than as a subconsultant to H2M) is also a Contractor. 
7.9. “Contractor Activity”  means every activity performed by a 
Contractor that is in any way related to furthering the Project or otherwise 
performed on the Site, regardless of whether such activity is required by 
contract. Contractor Activity also includes a Contractor’s failure to 
perform any activity required by law or contract. 
8. General Terms 
8.1. Headings. Paragraph numbering and headings are for navigational 
purposes only and shall be given no weight in construing the terms and 
conditions of this Contract. 
8.2. Integration. This Contract, the components of which are specified 
in the proposal, represents the entire and integrated agreement between 
Client and H2M. This Contract supersedes all prior representations, 
negotiations, and agreements, written or otherwise. In the event of any 
conflict between other Contract terms and these T&C , these T&C shall 
govern, unless the conflicting term specifically states that it is superior in 
precedence to this these T&C. 
8.3. Severability. If any term or condition in this Contract is found to be 
unenforceable, the enforceable remainder shall be valid and binding  
upon the Parties. No waiver of any term or condition shall be construed 
to be a waiver of any subsequent breach. 
8.4. Amendment. Any modification or addition to this Contract shall not 
be enforceable unless agreed upon in writing.  
8.5. Delegation. Any delegation of a Party’s right or obligation under this 
Contract shall be void unless made pursuant to advance written consent 
from the other Party. 
8.6. Force Majeure. Neither Party shall be responsible for damages or 
delay caused by extraordinary events that are beyond its reasonable 
control and due care (as nonexclusive examples, war, terrorism, and 
natural disasters). 
8.7. Choice of Law.  The Standard of Professional Care applicable to 
the Services shall be supplied by the law of the state in which the Site is 
located. The remainder of this Contract shall be governed by the laws of 
the State of New York  when the Site is located in New York, or  by the 
laws of the State of New Jersey for all other Projects. 
8.8. Choice of Forum.  The Parties agree that the courts of New York 
State shall have jurisdiction over the Parties and their disputes arising 
under or related to this Contract as it pertains to any Site in New York 
State, and consent to the jurisdiction of said courts. Any New York 
litigation arising under or related to this Contract shall be filed in a court 
located in Nassau County, New York, or any New York county in which 
H2M maintains a permanent office at the time such litigation is 
commenced. The Parties agree that the courts of New Jersey shall have 
jurisdiction over the Parties and their disputes arising under or related to 
this Contract as it pertains to any Site outside New York State, and 
consent to the jurisdiction of said courts. Any non -New York litigation 
arising under or related to this Contract shall be filed in a court located in 
Morris County, New Jersey, or any New Jersey county in which H2M 
maintains a permanent office at the time such litigation is commenced. 
9. Construction-Related Terms 
9.1. Construction and Site Safety. Client represents that it is the Owner 
of the Site, or has the Owner’s permission to control the Site. Nothing in 
this Contract or otherwise shall be interpreted to give H2M responsibility 
for safety upon the Site, nor for any means, methods, techniques, 
sequences, or procedures used, or failed to be used, in any Contractor 
Activity or other activity on the Project or Site (including, but not limited 
to shoring, bracing, scaffolding, underpinning, excavating, t emporary 
retaining, erecting, staging, etc.). H2M employees shall comply with Site 
safety programs, when applicable.  
9.2. Contractor’s Insurance. Client is responsible for determining and 
demanding Contractor insurance that sufficiently protects Client. 
Additionally, to protect H2M, the Client shall cause any Contractor to 
procure, prior to commencing any Contractor Activity, at least the 
following insurance coverage, which must remain in force during all such 
activity and its associated guarantee:  
9.2.1. Workers’ Compensation and Disability coverages with limits at 
least in the amount required by law. 
9.2.2. Employers’ Liability coverage with policy limits not less than one 
million dollars ($ 1,000,000) each accident, one million dollars 
($1,000,000) each employee, and one million dollars ($1,000,000) policy 
limit.  

Page 104

(Ver 210520) 
Page 4 of 4 
9.2.3. Automobile Liability coverage for Contractor owned and non -
owned vehicles utilized in performance of the Contract Activity, meeting 
statutorily required coverage, and with policy limits not less than one  
million dollars ($1,000,000) each accident for bodily injury, death of any 
person and property damage. 
9.2.4. Commercial General Liability coverage with policy limits of not 
less than one million dollars ($1 ,000,000) each occurrence and three 
million dollars ($3,000,000) in the aggregate for bodily injury and property 
damage, and which includes the following features: 
9.2.4.a. Explosion, Collapse and Underground coverage, whenever 
such would apply to the Contractor Activity; 
9.2.4.b. Pollution Liability coverage, whenever such would apply to 
the Contractor Activity; 
9.2.4.c. Contractual Liability coverage sufficient to insure the 
indemnity required by 7.4. below; and 
9.2.4.d. Additional Insured coverage for H2M, by endorsement using 
ISO Form CG 20 32 04 13, specifying each of the entities listed in 3.2. 
above, as well as all of their directors, officers and employees.  
9.2.5. Professional Liability coverage, whenever such would apply to 
the Contractor Activity, for negligent acts, errors and omissions in the 
performance of professional services with policy limits of not less than 
one million dollars ($1 ,000,000) per claim and one million dollars 
($1,000,000) in the aggregate. 
9.3. Contractor’s Indemnity. Client shall require each of its Contractors 
to agree, via a written contract  executed prior to commencing any 
Contractor Activity, to defend and indemnify the Client and the “H2M 
Indemnitees” (including each of the entities listed in 3.2. above, as well 
as all of their directors, officers, employees, consultants and agents) 
against all claims, liabilities and costs arising, or alleged to arise, from 
the negligence of the Contractor (including its owners, directors, 
employees, contractors and any others for whom the Contractor is legally 
responsible) in its Contractor Activity or any of its other activities 
concerning the Project or Site. This obligation does not apply to such 
claims, liabilities and costs that are caused by the sole negligence of the 
H2M Indemnitee itself.  
9.4.  Cost Opinions. Any opinion of cost that H2M prepares is merely 
an estimate supplied for the Client’s general guidance. H2M has no 
control over variations in market conditions, suppliers’ or contractors’ 
bidding strategies, nor the impacts that these and other variables have 
on the actual cost of labor and materials. Therefore, H2M cannot 
guarantee the level of accuracy of any such estimates. If greater 
accuracy is required, the Client shall separately engage an independent 
cost estimator.  
9.5.  Bid Process. If H2M is to participate in Contractor bid process, 
Client shall provide H2M with standard bid documents required and 
advertise for proposals from bidders, open the proposals at the appointed 
time and place and pay costs incident thereto. The Client shall hold all 
required special meetings, serve all required public and private notices, 
receive and act upon all protests and fulfill all requirements necessary in 
the development of the contracts and pay all costs  including application 
and permit fees incident thereto. 
9.6. Construction Observation Services. If the Services include H2M 
providing construction observation services, H2M shall provide such 
services over a period defined in, and on a frequency defined in the 
proposal. Regardless of the required frequency, H2M shall observe the 
Contractors’ work only for general conformance with the plans and 
specifications. Such Services do not include any obligation to review any 
Contractors' construction means, methods, techniques, sequences or 
procedures, or any safety precautions and programs in connection with 
the Project or Site. H2M is not responsible for any Contractors' failure to 
carry out its work in accordance with the construction contracts. If the 
construction schedule is extended for any reason (except due to H2M’s 
own negligence) H2M shall be entitled to payment for its extended effort 
as additional services pursuant to 4.1. above, regardless  of whether 
Client seeks reimbursement from the responsible party.
Accepted and Agreed 
Client H2M 
Signature Signature 
By: Name By: Name 
Title Title 
Date Date 

Page 105

Education
B.S., Civil Engineering; University of Hartford
Certificate in Construction Management
Licenses/
Certifications
Professional Engineer: CT, NY, RI
H2M Project Management Training Program
Memberships
American Society of Civil Engineers (ASCE)
Water Environment Federation (WEF)
Awards
Board of Director Service Award, NYWEA
Ones To Watch, NYWEA
Mr. Levasseur brings over 20 years of engineering experience to his role as H2M’s Windsor, CT, Office 
Director. A licensed Professional Engineer and seasoned project leader, he is widely recognized for 
his technical expertise in wastewater infrastructure, including the planning, design, and contract 
administration of treatment plants, gravity sewers, low-pressure systems, force mains, and pumping 
stations. However, his value to clients and project teams extends far beyond his wastewater credentials.
As Office Director, Mr. Levasseur plays a pivotal role in the strategic growth and operational leadership 
of H2M’s Windsor office. He serves as a key client liaison and trusted advisor across a wide range 
of municipal and infrastructure projects throughout Connecticut. His deep familiarity with the state’s 
regulatory landscape, municipal priorities, and funding mechanisms allows him to anticipate client 
needs and guide teams toward practical, cost-effective solutions.
Mr. Levasseur is frequently called upon to serve as Principal-in-Charge, Technical Advisor, or QA/QC Lead 
on multidisciplinary projects—ranging from water main extensions and environmental assessments to 
zoning regulation updates, brownfield redevelopment, and more. His ability to bridge technical rigor 
with client-focused delivery makes him an asset on both proposal teams and project execution.
His leadership is grounded in responsiveness, accountability, and a commitment to quality. Whether 
supporting proposal strategy, mentoring junior staff, or representing H2M in client meetings, he brings 
a steady hand and a collaborative mindset that aligns with the firm’s mission, vision, and values.
Gregory J. Levasseur P.E.
Vice President, Windsor Office Director

Page 106

Education
B.S., Engineering Science; Stony Brook 
University
Licenses/
Certifications
Professional Engineer: NY
Memberships
American Society of Heating, Refrigerating 
and Air-Conditioning Engineers
American Society of Mechanical Engineers
National Society of Professional Engineers
Mr. Hochhausl has more than 30 years of experience completing various engineering system design 
projects for clients in the medical, education, and pharmaceutical industries. This experience includes 
automated industrial, pharmaceutical, packing equipment, distribution, utility generation, and HVAC 
systems, from their conception to installation at client facilities. 
Selected project experience
• SUNY Stony Brook; Stony Brook and Southampton, NY: Project Manager for various HVAC upgrade 
projects including: Tabler Performing Arts HVAC replacements; Hospital BST and HSC buildings multiple 
research lab renovations; research cage wash facility upgrade; sensitive animals care upgrade; and 
marine research chiller replacement at Southhampton Campus. 
• SUNY Farmingdale Gleeson Hall HVAC Replacement; Farmingdale, NY: Senior Discipline Engineer 
tasked with replacing the HVAC systems in Gleeson Hall (120,000 square feet) at SUNY Farmingdale 
while keeping the building fully operational. This includes installing a hot glycol systems, chillers, air 
handling units with energy recovery ventilation, new ductwork, new distribution piping, variable air 
volume system, and updated controls. Assessed energy usage to ensure building met NYStretch Energy 
Code and energy use intensity goals. (Ongoing)
• Various Public School Districts K-12 Buildings; Long Island, NY: Senior Discipline Engineer for HVAC 
upgrades, decarbonization, and electrification including thousands of tons of heat pump equipment, 
VRF, DOAS, and energy recovery systems. 
• Various School Districts School Reopening Ventilation Systems Reviews; Various Locations, NY: 
Senior Discipline Engineer responsible for the installation of ventilation dehumidification improvements 
for various school districts in Long Island and upstate New York. Ventilation improvements included 
measures to meet COVID-19 filtration requirements as well as energy-efficient measures for the future 
decarbonization of these facilities via a transition to electric heating and cooling and/or use of alternative 
fuels. 
• Massapequa School District H&V Furnace Conversion; Massapequa, NY: Senior Project Engineer 
responsible for converting an indirect 75,000 cubic-feet-per-minute heating system with dual condensing 
boilers, hot water coils, new gas services, and improved controls. Also replaced a single fan with wall fan 
technology and associated filtration settings and controls. Achieved N+1 redundancy for building heating 
plant and distribution. 
• Rhode Island College Campus Steam Distribution Study; Providence, RI: Project Engineer responsible 
for performing a site survey for over 5,000 linear feet of direct buried steam and condensate piping on a 
150-acre campus using aerial thermal imaging to map surface temperatures. Following the site survey, 
performed a physical survey of areas involving temperature mapping of the ground and gradients in 
surface area. Using heat loss calculations, a formula was developed to correlate the rate of heat loss 
to level of deterioration of the connective piping and insulation, from which the remaining years of the 
system’s usable life was approximated. Developed a construction cost estimate for replacement piping 
which served as the basis of an ESCO to fund the project. 
• Forest Labs; Hauppauge, NY: Project Engineer tasked with the analyzing and producing the design 
documents for the replacement of a 1,000-ton air-cooled chiller plant with a 800-ton water-cooled chiller 
plant. This required the analysis of existing building conditions and requirements, system modifications 
to change Delta T operation, glycol percentage, and airflow reductions. Conducted economic and BIN 
analyses to determine if maximum efficiency can be achieved via utilizing a water-cooled chiller plant; 
resulted in the installation of two 400-ton water-cooled chillers, two cooling towers, and a dry cooler to 
meet process loads and specifications. 
• Brooklyn Navy Yard Development Corporation Steamline Relocation; Brooklyn, NY: Senior Project 
Engineer that led the replacement and relocation of an above-ground high-pressure steamline 
underground. This involved comprehensive investigation and coordination to avoid interference with 
underground utilities; constructing new steam pressure-relieve vents MERs; and installing new piping for 
improved steam distribution and condensate return, requiring minimal building shutdown. 
Alexander Hochhausl P.E.
Vice President, 
Assistant Department Manager - Mechanical Engineering
APPENDIX C (4 PAGES)

Page 107

• Seminole Tribe of Florida Ball Field Renovations; Immokalee, FL: Working with the Seminole Tribe of 
Florida in Immokalee to design the renovation of athletic facilities as a subconsultant to LTG Sports 
Turf One. The project includes renovation of existing facilities: ball field, concession/restroom building, 
dugouts, press box, and bleachers, as well as the addition of a new north ball field. 
• Estee Lauder Multiple Laboratories; Long Island, NY: Managed the design and construction of multiple 
laboratories, including the bioferm lab, makeup lab, CDLM-G lab, and the Creams 5 lab, the largest 
creams laboratory on the east coast. Design included HVAC and mechanical process design involving 
steam, chilled water, nitrogen, compressed air, and domestic water systems. Responsibilities also 
included the management of the architectural, structural, and MEP portions of the design.
• Mercedes Benz and Competition BMW Showrooms; Smithtown and Huntington, NY: HVAC design for 
showroom additions.  The additions included a complete re-design of their HVAC system utilizing Revit, 
including the installation of vehicle exhaust systems. 
• DASNY Samaritan Village at the Highbridge Residential Treatment Center; Bronx, NY: HVAC design in 
Revit for a five-story treatment center.  This included an outdoor air cooled chiller with chilled water, and 
an indoor boiler system, both with indoor air handling units. 
• Greybarn Apartment Development; Amityville, NY: HVAC design for seven apartment buildings in 
Amityville, which included a central laundry and bathroom exhaust system, packaged terminal air 
conditioners, and VRF systems for the public spaces.
• Multiple Fire Districts: Roslyn NY, Massapequa NY, Sanford Heights NY, and Borough of Metuchen NJ: 
HVAC design for multiple fire houses, including packaged units, VRF, in-floor radiant, snowmelt systems, 
and vehicle exhaust systems.
• Northport American Legion; Northport, NY: HVAC design for additions and alterations to the American 
Legion building. This included the design of split system air handlers with gas furnaces, as well as 
elevator exhaust.
• Engel Burman Group New Bristal Assisted Living Buildings; Long Island, NY: HVAC design for new 
assisted living buildings.  This included VRF systems, rooftop energy recovery units, dedicated outdoor 
air units, kitchen exhaust design, and laundry exhaust design.
• Village of Ocean Beach Village Office Building Renovation; Ocean Beach, NY: HVAC design of 
renovated Office Building.  This included a VRF system, which would help keep the HVAC system as 
energy efficient as possible. 
• Gabrielli Building Canopy; Long Island, NY: This project required the installation of a diesel fuel tank, a 
dispensing station, and a control system for the dispensing of fuel. 
• Court Plaza Domestic Water Heater Upgrades; Long Island, NY: Plumbing design for apartment building.  
This included the selection of new domestic water heaters, as well as selecting a new expansion tank, 
and re-designing the piping layout for the hot water system in the boiler room. 
• Ørsted Operations and Maintenance Facility; Setauket, NY: Design of a LEED Certified building utilizing 
VRF to promote energy efficiency, with a 72 ton data center utilizing Dunham-Bush CRAC units.
• Steel Equities Stony Brook Medicine; Lake Grove, NY: Design for the renovation of a former retail store 
into a medical center following ASHRAE 170 at the Smithhaven Mall. The design included packaged 
rooftop units with special care on pressurizing code required rooms for medical facilities.
Education
B.S., Mechanical Engineering; 
Messiah College
Licenses/
Certifications
Professional Engineer: NY, NJ, CT, FL
Certified Energy Manager (CEM)
TRANE Air Conditioning Clinic
OSHA 10-Hour Construction Safety & Health 
Project Management Training Program, H2M
H2M Mentoring Program Graduate, Mentee
Memberships
American Society of Heating, Refrigerating 
and Air Conditioning Engineers
Mr. Foerth is a mechanical engineer with 15 years of experience. His responsibilities include the 
preparation of heating and cooling load calculations, equipment selection, HVAC system design in 
AutoCAD and Revit, and shop drawing review. He also assists H2M’s Energy Market with energy modeling 
and auditing services, as well as assembles real estate proposals and fees for HVAC designs. He is an 
H2M certified project manager and serves as the manager and client contact for H2M’s Estee Lauder 
account.
Selected project experience
Senior Associate, Discipline Engineer - Mechanical Engineering
Paul D. Foerth P.E., CEM

Page 108

Education
B.S., Mechanical Engineering;        
Binghamton University
Licenses/
Certifications
Professional Engineer: NY, NJ
Certified Energy Manager (CEM)
Memberships
American Society of Heating, Refrigerating, 
and Air conditioning Engineer (ASHRAE)
Association of Energy Engineers (AEE)
Shannah E. Sherman-Corrado P.E., CEM
Senior Project Engineer - Mechanical Engineering 
Mrs. Sherman-Corrado is a mechanical engineer with 13 years of experience in the HVAC industry 
focused on residential, commercial, and education projects. Her expertise in HVAC system design 
includes equipment selection, heating and cooling load calculations, CHP/cogeneration design, fuel 
conversion, boiler and chiller plant design, and energy audits (Level I, II, LL87). Mrs. Sherman-Corrado 
often manages multi-disciplinary coordination to deliver projects on time and on budget. 
Selected project experience
• Syosset Central School District Ventilation Upgrades at Various Schools; Syosset, NY: Acted as HVAC 
system design engineer and project manager for the design and implementation of new ventilation 
systems at various school buildings through the use of dedicated outdoor air units, energy recovery 
ventilators, and unit ventilators. 
• Confidential Client Warehouse and Command Center; Setauket, NY: Designed replacement building 
mechanical systems to accommodate the owner’s requirements and meet LEED certification. Systems 
supported the following areas: data center, offices, warehouse, cafeteria, and chemical storage. 
Designed variable refrigerant flow (VRF) systems, dedicated outdoor air units, energy recovery 
ventilators, computer room air conditioning (CRAC) units, and new building management system (BMS). 
• Mineola Union Free School District Mineola Middle School Gymnasium Addition; Mineola, NY: Designed 
mechanical systems for a new gymnasium addition and interior alterations, including the relocation of 
the cafeteria, kitchen, locker rooms, and fitness center. Provided HVAC load calculations to support 
the needs of the new spaces. Designed VRF systems, dedicated outdoor air units, energy recovery 
ventilators, kitchen exhaust/makeup air, and DX air handling units.
• Mineola Union Free School District Mineola Middle School Interior Alterations; Mineola, NY: Designed 
mechanical systems for the conversion of cafeteria and kitchen spaces to art and science classrooms 
and renovation of the music wing. Provided HVAC load calculations for the altered spaces and designed 
ductless split systems, VRF systems, unit ventilators, energy recovery ventilators, and kiln ventilation. 
• Dormitory Authority of the State of New York (DASNY) City University of New York (CUNY) LaGuardia 
Community College STEM Lab Renovations; Queens, NY: Designed mechanical systems for new 
chemistry and biology labs, research space, occupational therapy, and physical therapy labs. Scope 
focused on adaptation of existing mechanical systems and implementation of additional equipment to 
meet the HVAC requirements of the new spaces. Performed HVAC load calculations and designed 
exhaust and makeup air systems for new laboratory equipment. 
• Longwood Central School District Air Conditioning at Various Schools; Middle Island, NY: Led the 
engineering design and implementation of the full replacement of HVAC at 10 schools in the District.  
Provided load calculations and system recommendations. Provided new gas fired rooftop units and 
rooftop units for air conditioning and ventilation with indoor hot water coils to utilize existing CHP system 
thermal heat. Design and implementation of a new building addition to the High School for a Career 
and Technical Education Center (CTE). New specialty spaces included cosmetology, engineering work 
shops, art rooms, and culinary arts. 
• Steel Equities Stony Brook Clinical at Smith Haven Mall; Lake Grove, NY: Designed new HVAC systems 
in accordance with FGI and ASHRAE 170 standards for medical facilities as part of renovation of 
the Sear’s building for new medicine outpatient treatment facilities (including Article 28 spaces and 
procedure rooms). Provided design load calculations, analyses of existing mechanical equipment, and 
mechanical system design. Provided new rooftop units including energy recovery ventilation, ductwork 
distribution systems, and ductless split units.
• Elan Strategy Realty Office Renovations; Levittown, NY: Managed renovation of an office building 
and multidisciplinary coordination to deliver project on time. Designed HVAC systems including load 
calculations, equipment selection, and document production.
Next

Page 109

• Various Water Districts Emerging Contaminant Removal; Long Island, NY: Senior Project Engineer 
responsible for preparing electrical plans and specifications for new 1,4 dioxane and/or PFOS/PFOA 
removal plants, including but not limited to new motor control center, PLC controls, and SCADA 
integration. Participated in emergency innovative design effort for many water districts required to meet 
certain maximum contamination level (MCL) in short time frame to continue to deliver potable water to 
Long Island customers. 
• Westchester County Port Chester WRRF HVAC and Electrical Upgrades; Port Chester, NY: Senior 
Project Engineer responsible for preparing electrical plans and specifications for the design and 
modification of the existing electrical power distribution systems throughout the entire 5 MGD water 
resource recovery facility (WRRF). The WRRF consists of 10 buildings containing various process-
related equipment powered by double-ended MCCs in a main-tie-main configuration. The project also 
includes replacement of the service entrance main switchgear, two distribution switchgear units, all 
MCCs, all step-down transformers, and all distribution panel boards. 
• Nassau County Department of Public Works (DPW) South Shore Water Reclamation Facility Phase E4 
Electrical Utility Connections; East Rockaway, NY: As Senior Project Engineer, prepared electrical plans 
and specifications for the design and modification of the replacement of the existing medium voltage 
switchgear and associated low voltage distribution switchgear supplying power for a critical process 
within the South Shore Water Reclamation Facility, formerly known as the Bay Park Sewage Treatment 
Plant.  In addition, the scope included the replacement of an existing Motor Control Center (MCC) in a 
main-tie-main configuration within a critical process building. All new equipment was elevated above the 
500-year flood plan. 
• Brooklyn Navy Yard Development Corporation (BNYDC) FEMA Boilers, Substations, and Isolated 
Electrical Work Contract; Brooklyn, NY: Electrical and Substation Designer for various FEMA-funded 
restoration and resiliency projects to repair Sandy damaged infrastructure and improve the resiliency of 
the existing infrastructure at Brooklyn Navy Yard. During Hurricane Sandy, floodwater levels averaged 
four feet throughout the Yard and saltwater caused extensive damage to electrical and mechanical 
systems. 
• Farmingdale Union Free School District Howitt Middle School Aquatic Center and Athletic Field 
Complex; Farmingdale, NY: Senior Project Engineer responsible for electrical design for the District’s 
new Aquatic Center. Prepared electrical plans and specifications for the design of electrical power 
systems, pool equipment power and control, HVAC equipment power and control, lighting, fire alarm 
system, information technology network and system, audiovisual system, public address system, CCTV, 
and security system for the Aquatic Center. The center consists of a competition pool, public pool, 
competition locker rooms, public locker rooms, pool equipment room, and miscellaneous office and 
storage areas. Also designed site lighting for the construction of a new synthetic turf multi-purpose field 
striped for various sports teams. 
• Exchange Ambulance of the Islips New Headquarters; East Islip, NY: Senior Project Engineer for the 
electrical systems of a new facility for the Exchange Ambulance of the Islips to improve the responders’ 
operations and workflow, living environment, and health and safety; enabling smoother operations and 
an improved work environment for first responders. 
• Inc. Village of Mineola New Fire Headquarters; Mineola, NY: Senior Project Engineer responsible for 
electrical engineering design for the Village’s new state-of-the-art fire headquarters, which replaced the 
original headquarters built in 1913. Responsibilities included power distribution, lighting, emergency 
generator, and IT/AV/CCTV design. 
Education
B.S., Electrical and Computer Engineering; 
New York Institute of Technology
Licenses/
Certifications
Professional Engineer: NY, NJ, CT, FL
Dale Carnegie Training Program
H2M Project Management Training Program
Mr. Starke is an electrical engineer with 15 years of experience providing electrical design for water, 
wastewater, and industrial projects. As H2M’s Assistant Department Manager of Electrical Engineering, he 
is responsible for leading a team of staff in the execution of high-quality electrical designs. Mr. Starke’s 
areas of expertise include power distribution design, new electrical services and service upgrades, 
motor control centers, programmable logic controls (PLC), emergency generators and systems, interior 
and exterior lighting, fire alarm systems, CCTV and access control systems, and security alarm systems. 
Selected project experience
Assistant Vice President, 
Assistant Department Manager - Electrical Engineering
Charles J. Starke P.E.