CT Public Docs Tracker

Towns / Granby / Public Building and Capital Project Committee / Aug 12, 2026

Public Building and Capital Project Committee, Aug 12, 2026

Granby minutes posted

Documents

TypeDocumentPagesOpen
minutes Public Building & Capital Project Committee Regular Meeting Minutes 3 PDF download · town site
agenda Public Building & Capital Project Committee Regular Meeting 2 PDF download · town site
packet Public Building & Capital Project Committee Regular Meeting (packet)
Not attached: this packet is 303 MB, too large to host here. Use the town site link.
695 town site

Summary of the minutes

AI-generated summary. Each line links to the PDF page it came from; check it before relying on it.

Read the official minutes (PDF, 3 pages) The PDF is the record; this summary is a guide to it.

The committee approved the July 8, 2026 minutes and formed a subcommittee to review engineering RFP proposals for future capital projects. The committee also reviewed proposed bond projects for the Granby Public Library ($7.5 million), Salmon Brook Park pickleball courts and bathroom, and sewer pump maintenance ($1.5 million), with no vote taken on those projects.

Decisions (3) · all reported votes

  1. Approval of PBCPC Regular Meeting Minutes – July 8, 2026
    Committee voted to approve the minutes of July 8, 2026, as presented.
    Vote: Motion by W. Pascucci, seconded by M. Lengvarsky, carried 6-0-0 · p. 1
  2. Engineering RFP Responses – subcommittee formation
    Committee voted to form a subcommittee to review the submitted proposals and make a recommendation to the full committee. Subcommittee members: Peter Anderson, Mark Gottlieb and Mark Neumann.
    Vote: Motion by W. Pascucci, seconded by M. Gottlieb, carried 6-0-0 · p. 1
  3. Adjournment
    Committee voted to adjourn the meeting at 7:00 p.m.
    Vote: Motion by D. Peling, seconded by W. Pascucci, carried 6-0-0 · p. 3

Also discussed (7)

  • Board of Education Projects – tour of Middle School and high school athletic fields: PBCPC will tour the Middle School and the high school athletic fields with BOE Director of Facilities Christopher Degray on Wednesday, September 9, 2026, at 4:30p.m. · p. 1
  • Library Renovation Introduction $7.5 million $6 million $1.5 million: Town proposes a $7.5 million project to renovate the Granby Public Library; $6 million in taxpayer funds in support of the bonds and $1.5 million through grants and private donations. Taxpayers will not be asked for more than the original $6 million. Introduced; no vote recorded. · p. 1, p. 2
  • SBP Pickleball Courts and Year-Round Bathroom – Next Steps $250,000 $250,000: Presented as Town project; relocation of pickleball courts to an area at least 300 feet from residential housing and a year-round bathroom near the Rovers field at Salmon Brook Park. Each estimated at $250,000. No vote recorded. · p. 2
  • Sewer Pump Maintenance – Next Steps $1.5 million: Town proposes a $1.5 million project to assess the sewer system and bring pumps up to current standards, including hiring an outside firm. No vote recorded. · p. 2
  • Milestones for bond questions: Chairman reviewed the milestones for each of the bond questions with the committee. No vote recorded. · p. 2
  • Professional Services RFPs: Committee did not identify any other services to consider an RFP for at this time. · p. 2
  • Bond/Capital Template – Website Information: Board of Selectmen approved a template including project title, cost, and brief summary of each project, to be posted on the Town's website. · p. 2
Summary of the agenda: Public Building & Capital Project Committee Regular Meeting

AI-generated summary.

This is the agenda for the Granby Public Building & Capital Project Committee regular meeting on August 12, 2026 at 6 p.m. at the Senior Center. It lists items to be discussed, including approval of July 8, 2026 minutes, engineering RFP responses, Board of Education and Town projects, and new business.

On the agenda (12)

  1. Approval of PBCPC Regular Meeting Minutes - July 8, 2026 · p. 1
  2. Engineering RFP Responses (eleven proposals listed: Benesch, BL Companies, Bowman, BSC, Beta Group, GZA, H2M, Level Engineering, SLR, Weston & Sampson, Phlow Water Advisory Group) · p. 1
  3. GMMS Repairs And Design/Scoping Work - Next Steps (Board of Education project) · p. 1
  4. GMHS Stadium Field, Track, Field Two, Baseball/Softball Fields - Next Steps (Board of Education project) · p. 1
  5. CIP Policy Discussion - Town Requests · p. 1
  6. Library Renovation Introduction · p. 2
  7. SBP Pickleball Courts And Year-Round Bathroom - Next Steps · p. 2
  8. Sewer Pump Maintenance - Next Steps · p. 2
  9. Milestones - Chairman Neumann · p. 2
  10. Creation of Subcommittee to Complete Engineering Interviews · p. 2
  11. Professional Services RFPs That Might Be Needed · p. 2
  12. Bond/Capital Template - Website Information · p. 2

This PDF is a scan; its text was read by OCR and may contain errors.

Full text of the documents

View the minutes PDF on this page (Public Building & Capital Project Committee Regular Meeting Minutes) Open the PDF
Text of the minutes (Public Building & Capital Project Committee Regular Meeting Minutes, 3 pages)

Page 1 · open in PDF

TOWN OF GRANBY 
PUBLIC BUILDING & CAPITAL PROJECT COMMITTEE 
REGULAR MEETING MINUTES 
AUGUST 12, 2026 
 
PRESENT: Chairman Mark Ne umann, Peter Anderson, Mark Gottlieb,  Michael Lengvarsky,   
William Pascucci and David Peling 
 
ALSO PRESENT: Cheri Burke, Superintendent of Schools and Mike Walsh, Town Manager  
 
ABSENT: Anne Adamson, Christopher Lavigne, Kent McCord 
 
1. PLEDGE OF ALLEGIANCE 
 
2. MINUTES 
2.I. Approval of PBCPC Regular Meeting Minutes – July 8, 2026 
ON A MOTION by W. Pascucci, seconded by M. Lengvarsky, the committee voted 
(6-0-0) to approve the minutes of July 8, 2026, as presented. 
 
3. OLD BUSINESS 
3.I. Engineering RFP Responses 
Town Manager Walsh presented the list of firms which responded to the RFP for an 
engineering firm to consult on the capital projects if approved by the voters. Chairman 
Neumann requested volunteers to form a subcommittee to review the proposals and 
report back to the full committee with a recommendation for interviews. 
 
ON A MOTION by W. Pascucci, seconded by M. Gottlieb, the committee voted (6- 0-0) 
to form a subcommittee to review the submitted proposals and make a recommendation 
to the full committee. Subcommittee members are Peter Anderson, Mark Gottlieb and 
Mark Neumann. 
 
3.II. Board of Education Projects 
The PBCPC will tour the Middle School and the high school athletic fields with BOE 
Director of Facilities Christopher Degray on Wednesday, September 9, 2026,  at 
4:30p.m. 
 
3.II.1. GMMS Repairs and Design/Scoping Work – Next Steps 
This agenda item was covered with item 3.II. 
3.II.2. GMHS Stadium Field, Track, Field Two, Baseball/Softball Fields – Next Steps 
This agenda item was covered with item 3.II. 
 
3.III. Town Projects 
The Town Manager provided an overview of the bonding process and introduced each 
of the proposed Town projects. 
 
3.III.1. Library Renovation Introduction 
The Town is proposing a $7.5 million project to renovate the Granby Public Library. 
Of the $7.5 million dollars, $6 million will be taxpayer funds in support of the bonds 
and t he difference of $ 1.5 million will be raised through grants and  private 

Page 2 · open in PDF

PBCPC Minutes 
8/12/26 
Page 2 
  
donations. The scope of the  project may expand with additional donat ions and 
grants. However, taxpayers will not be asked for more than the original $6 million. 
 
3.III.2. SBP Pickleball Courts and Year-Round Bathroom – Next Steps 
The Town provides pickleball courts for use by residents on the existing tennis 
courts at Salmon Brook Park. Due to complaints by several residents neighboring 
the park, noise reducing barriers were installed in the spring of 2026. However, the 
permanent solution is to relocate the courts to an area in the park which is at least 
300 feet from residential housing. The addition of stand- alone pickleball courts at 
Salmon Brook Park is strongly supported by residents, recommended by the Parks 
& Recreation Board and supported by the GZA Parks Master Plan. The cost for 
the pickleball courts is estimated to be $250,000. 
 
The second part of this project is to build a year -round bathroom near the Rovers 
field at Salmon Brook Park. Residents are frequenting the park in greater numbers 
with the completion of the walking path in 2024 and the use is expected to increase 
when the path is extended through the Rovers field to the parking lot on Route 20. 
Currently there is no y ear-round bathroom for the convenience of residents, 
especially at the north end of the park. Adding this amenity to the park is supported 
by residents, recommended by the Parks & Recreation board and by the GZA 
Parks Master Plan. The cost for the year-round bathroom at Salmon Brook Park is 
estimated to be $250,000. 
 
3.III.3. Sewer Pump Maintenance – Next Steps 
The Town is proposing a $1.5 million project to assess the condition of the Town 
sewer system and to bring the pumps up to  current standards. An outside fi rm 
would be hired to review the 2024 sewer system infiltration study, inspect the three 
sewer pumps and define the scope of the work to add more reliable electricity, an 
updated warning system, replace aging mechanicals and design a backup plan for 
the system. 
 
4. NEW BUSINESS 
4.I. Milestones – Chairman Neumann 
The chairman reviewed the milestones for each of the bond questions with the 
committee. 
 
4.II. Creation of Subcommittee to Complete Engineering Interviews 
This agenda item was covered with item 3.I. 
 
4.III. Professional Services RFP’s That Might Be Needed 
The committee did not identify any other services to consider an RFP for at this time. 
 
4.IV. Bond/Capital Template – Website Information 
The Board of Selectmen approved a template which will include the project ti tle, cost, 
and a brief summary of each project that will be posted on the Town’s website to provide 
detailed information to the residents and anyone else interested in learning more about 
the proposed projects. 
 
5. DISCUSSION OF ACTION ITEMS FOR THE NEXT MEETING 

Page 3 · open in PDF

PBCPC Minutes 
8/12/26 
Page 3 
  
The subcommittee will present their recommendations on the final three to five engineering 
firms to be interviewed for consideration. 
 
6. PUBLIC COMMENT 
There was no public comment. 
 
7. ADJOURNMENT: 
ON A MOTION by D. Peling , seconded by  W. Pascucci , the committee voted (6-0-0) to 
adjourn the meeting at 7:00 p.m. 
 
The next regular meeting of the Public Building & Capital Project Committee is scheduled for 
Wednesday, September 9, 2026, at 6p.m. at the Senior Center. 
 
 
Respectfully submitted,  
 
Betsy Mazzotta 
Recording Secretary 
View the agenda PDF on this page (Public Building & Capital Project Committee Regular Meeting) Open the PDF
Text read from the scanned agenda (OCR) (Public Building & Capital Project Committee Regular Meeting, 2 pages)

Page 1 · open in PDF

Town of Granby is inviting you to a scheduled Zoom meeting.

https://us02web.zoom.us/j/83944837028?

pwd=CkmJoawaXEzdY6YcA4CKLPlJr0IQ7M.1

Meeting ID: 839 4483 7028

Passcode: 247687

**TOWN OF GRANBY**
**Public Building & Capital Project Committee**
**Regular Meeting Agenda**
**Wednesday, August 12, 2026 – 6 p.m.**
**Senior Center**

1. Pledge Of Allegiance

2. Minutes

2.I. Approval Of PBCPC Regular Meeting Minutes - July 8, 2026

Documents:

PBCPC MINUTES 07-08-2026.PDF

3. Old Business

3.I. Engineering RFP Responses

Documents:

3A BENESCH TOWN OF GRANBY ON-CALL PROFESSIONAL ENGINEERING SERVICES.PDF
3B BL COMPANIES_GRANBY RFP PROFESSIONAL ENGINEERING.PDF
3C BOWMAN_TOWN OF GRANBY.PDF
3D BSC_GRANBY_PROFESSIONAL ENGINEERING SERVICES_PROPOSAL.PDF
3E DIGITAL - BETA GROUP RESPONSE TO RFP - ON-CALL ENGINEERING SERVICES.PDF
3F GZA PROPOSAL ENGINEERING SERVICES.PDF
3G H2M PROPOSAL FOR PROFESSIONAL ENGINEERING SERVICES_EMAIL.PDF
3H LEVEL ENGINEERING.PDF
3I SLR_PROPOSAL.PDF
3J WESTON SAMPSON SUBMITTAL_PROFESSIONAL ENGINEERING SERVICES.PDF
3K PHLOW WATER ADVISORY GROUP.PDF

3.II. Board Of Education Projects

3.II.i. GMMS Repairs And Design/Scoping Work - Next Steps

3.II.ii. GMHS Stadium Field, Track, Field Two, Baseball/Softball Fields - Next Steps

3.III. Town Projects

Documents:

CIP POLICY DISCUSSION_TOWN REQUESTS.PDF

Page 2 · open in PDF

3.III.i. Library Renovation Introduction

3.III.ii. SBP Pickleball Courts And Year-Round Bathroom - Next Steps

3.III.iii. Sewer Pump Maintenance - Next Steps

4. New Business

4.I. Milestones - Chairman Neumann

Documents:

2607029 MILESTONES MEMO.PDF

4.II. Creation Of Subcommittee To Complete Engineering Interviews

4.III. Professional Services RFPs That Might Be Needed

4.IV. Bond/Capital Template - Website Information

Documents:

DRAFT TEMPLATE FOR CAPITAL PROJECT DESCRIPTIONS.PDF

5. Discussion Of Action Items For The Next Meeting

6. Public Comment

7. Adjournment

The next regular meeting of the Public Building & Capital Project Committee is scheduled for Wednesday, September 9, 2026, at 6 p.m. at the Senior Center.
Text of the packet (Public Building & Capital Project Committee Regular Meeting (packet), 695 pages)

Page 1

Town of Granby is inviting you to a scheduled Zoom meeting. 
https://us02web.zoom.us/j/83944837028?
pwd=CkmJoawaXEzdY6YcA4CKLPIJr0lQ7M.1
Meeting ID: 839 4483 7028 
 Passcode: 247687 
TOWN OF GRANBY
Public Building & Capital Project Committee
Regular Meeting Agenda
Wednesday, August 12, 2026 – 6 p.m.
 Senior Center
Pledge Of Allegiance
Minutes
Approval Of PBCPC Regular Meeting Minutes - July 8, 2026
PBCPC MINUTES 07-08-2026.PDF
Old Business
Engineering RFP Responses
3A BENESCH TOWN OF GRANBY ON-CALL PROFESSIONAL 
ENGINEERING SERVICES.PDF
3B BL COMPANIES_GRANBY RFP PROFESSIONAL ENGINEERING.PDF
3C BOWMAN_TOWN OF GRANBY.PDF
3D BSC_GRANBY_PROFESSIONAL ENGINEERING 
SERVICES_PROPOSAL.PDF
3E DIGITAL - BETA GROUP RESPONSE TO RFP - ON-CALL ENGINEERING 
SERVICES.PDF
3F GZA PROPOSAL ENGINEERING SERVICES.PDF
3G H2M PROPOSAL FOR PROFESSIONAL ENGINEERING 
SERVICES_EMAIL.PDF
3H LEVEL ENGINEERING.PDF
3I SLR_PROPOSAL.PDF
3J WESTON SAMPSON SUBMITTAL_PROFESSIONAL ENGINEERING 
SERVICES.PDF
3K PHLOW WATER ADVISORY GROUP.PDF
Board Of Education Projects
GMMS Repairs And Design/Scoping Work - Next Steps
GMHS Stadium Field, Track, Field Two, Baseball/Softball Fields - Next Steps
Town Projects
CIP POLICY DISCUSSION_ TOWN REQUESTS.PDF
Library Renovation Introduction
SBP Pickleball Courts And Year-Round Bathroom - Next Steps
Sewer Pump Maintenance - Next Steps
New Business
Milestones - Chairman Neumann
2607029 MILESTONES MEMO.PDF
Creation Of Subcommittee To Complete Engineering Interviews
Professional Services RFPs That Might Be Needed
Bond/Capital Template - Website Information
DRAFT TEMPLATE FOR CAPITAL PROJECT DESCRIPTIONS.PDF
Discussion Of Action Items For The Next Meeting
Public Comment
Adjournment
The next regular meeting of the Public Building & Capital Project Committee is 
scheduled for Wednesday, September 9, 2026, at 6 p.m. at the Senior Center.
1.
2.
2.I.
Documents:
3.
3.I.
Documents:
3.II.
3.II.i.
3.II.ii.
3.III.
Documents:
3.III.i.
3.III.ii.
3.III.iii.
4.
4.I.
Documents:
4.II.
4.III.
4.IV.
Documents:
5.
6.
7.

Page 2

Town of Granby is inviting you to a scheduled Zoom meeting. 
https://us02web.zoom.us/j/83944837028?
pwd=CkmJoawaXEzdY6YcA4CKLPIJr0lQ7M.1
Meeting ID: 839 4483 7028 
 Passcode: 247687 
TOWN OF GRANBY
Public Building & Capital Project Committee
Regular Meeting Agenda
Wednesday, August 12, 2026 – 6 p.m.
 Senior Center
Pledge Of Allegiance
Minutes
Approval Of PBCPC Regular Meeting Minutes - July 8, 2026
PBCPC MINUTES 07-08-2026.PDF
Old Business
Engineering RFP Responses
3A BENESCH TOWN OF GRANBY ON-CALL PROFESSIONAL 
ENGINEERING SERVICES.PDF
3B BL COMPANIES_GRANBY RFP PROFESSIONAL ENGINEERING.PDF
3C BOWMAN_TOWN OF GRANBY.PDF
3D BSC_GRANBY_PROFESSIONAL ENGINEERING 
SERVICES_PROPOSAL.PDF
3E DIGITAL - BETA GROUP RESPONSE TO RFP - ON-CALL ENGINEERING 
SERVICES.PDF
3F GZA PROPOSAL ENGINEERING SERVICES.PDF
3G H2M PROPOSAL FOR PROFESSIONAL ENGINEERING 
SERVICES_EMAIL.PDF
3H LEVEL ENGINEERING.PDF
3I SLR_PROPOSAL.PDF
3J WESTON SAMPSON SUBMITTAL_PROFESSIONAL ENGINEERING 
SERVICES.PDF
3K PHLOW WATER ADVISORY GROUP.PDF
Board Of Education Projects
GMMS Repairs And Design/Scoping Work - Next Steps
GMHS Stadium Field, Track, Field Two, Baseball/Softball Fields - Next Steps
Town Projects
CIP POLICY DISCUSSION_ TOWN REQUESTS.PDF
Library Renovation Introduction
SBP Pickleball Courts And Year-Round Bathroom - Next Steps
Sewer Pump Maintenance - Next Steps
New Business
Milestones - Chairman Neumann
2607029 MILESTONES MEMO.PDF
Creation Of Subcommittee To Complete Engineering Interviews
Professional Services RFPs That Might Be Needed
Bond/Capital Template - Website Information
DRAFT TEMPLATE FOR CAPITAL PROJECT DESCRIPTIONS.PDF
Discussion Of Action Items For The Next Meeting
Public Comment
Adjournment
The next regular meeting of the Public Building & Capital Project Committee is 
scheduled for Wednesday, September 9, 2026, at 6 p.m. at the Senior Center.
1.
2.
2.I.
Documents:
3.
3.I.
Documents:
3.II.
3.II.i.
3.II.ii.
3.III.
Documents:
3.III.i.
3.III.ii.
3.III.iii.
4.
4.I.
Documents:
4.II.
4.III.
4.IV.
Documents:
5.
6.
7.

Page 3

TOWN OF GRANBY 
PUBLIC BUILDING & CAPITAL PROJECT COMMITTEE 
REGULAR MEETING MINUTES 
JULY 8, 2026 
 
PRESENT: Anne Adamson, Peter Anderson, Mark Gottlieb, Christopher Lavigne, Michael 
Lengvarsky, Kent McCord, Mark Neumann, and William Pascucci 
 
ALSO PRESENT: Cheri Burke, Superintendent of Schools and Mike Walsh, Town Manager  
 
ABSENT: David Peling 
 
1. PLEDGE OF ALLEGIANCE 
 
2. INTRODUCTION OF MEMBERS AND OPENING REMARKS 
The members of the committee were introduced, and First Selectman Mark Fiorentino 
welcomed the group and thanked them for their willingness to serve on the committee. 
 
3. ELECT CHAIR, VICE CHAIR AND SECRETARY 
Mark Neumann was nominated to serve as chairman. There being no further nominations, 
nominations were closed. By unanimous vote, Mark Neumann was elected chairman. 
 
Anne Adamson was nominated to serve as vice- chairman. There being no further 
nominations, nominations were closed. By unanimous vote, Anne Adamson was elected vice-
chairman. 
 
There were no nominations for the position of secretary. 
 
4. ADOPT ROBERTS RULES 
ON A MOTION by M. Gottlieb, seconded by  M. Lengvarsky, the committee voted (8-0-0) to 
conduct its meetings in accordance with Robert’s Rules of Order. 
 
5. ADOPT MEETING SCHEDULE 
ON A MOTION by A. Adamson, seconded by  W. Pascucci, the committee voted (8-0-0) to 
adopt the meeting schedule submitted to the Town clerk and meet regularly on the second 
Wednesday of each month. 
 
6. DISCUSSION ON BOND REFERENDUM QUESTIONS, PROCEEDINGS & PROCESS 
Town Manager Walsh provided an overview of the charge of the committee and the bonding 
process. 
 
7. OVERVIEW OF INDVIDUAL PROJECTS 
7.I. Granby Public Library Renovation and Expansion Project 
Discussion of the library project was deferred to a future meeting. 
 
7.II. Granby Memorial Middle School Repairs and Design/Scoping Work Project 
Superintendent Burke and Christopher Degray, BOE Director of Facilities presented an 
overview of the middle school project and the high school athletic fields project. 
 

Page 4

PBCPC Minutes 
7/8/26 
Page 2 
  
7.III. High School Baseball/Softball Fields 
This agenda item was incorporated into the discussion of agenda item 7.II. 
 
7.IV. High School Stadium Field, Track, and Field Two 
This agenda item was incorporated into the discussion of agenda item 7.II. 
 
7.V. Salmon Brook Park Pickleball Courts and Year-Round Bathroom Project 
Discussion of the Salmon Brook Park projects was deferred to a future meeting. 
 
7.VI. Sewer Pump Maintenance Project 
Discussion of the sewer pump project was deferred to a future meeting. 
 
8. DISCUSSION OF ACTION ITEMS FOR NEXT MEETING 
8.I. Engineering RFP Issued and Responses Shared 
Responses to the Request for Proposal for an engineering firm will be shared and 
discussed at the next meeting. 
  
9. ADJOURNMENT: 
ON A MOTION by  K. McCord, seconded by  A. Adamson, the committee voted (8-0-0) to 
adjourn the meeting at 7:56 p.m. 
 
 
 
 
Respectfully submitted,  
 
Betsy Mazzotta 
Recording Secretary 

Page 5

STATEMENT OF QUALIFICATIONS
On-Call Professional 
Engineering Services
The Town of Granby
JULY 2026

Page 6

Please note: This document is designed for double-sided printing. 
Intentional blank pages are included for proper alignment.

Page 7

July 24, 2026
Mike Walsh
Town Manager
Town of Granby
Manager’s Office
15 North Granby Road
Granby, CT 06035
RE: Town of Granby Request for Proposals – Professional Engineering Services
Dear Mr. Walsh:
The Town of Granby is committed to building a community where residents of all ages have access to quality public spaces 
and recreational opportunities. The improvements outlined in this RFP represent meaningful investments in the health, 
vitality and pride of your community. Benesch is proud to submit our qualifications for this engagement, and we are fully 
committed to delivering the professional engineering services the Town deserves, on time and within budget, through every 
phase of planning, design and construction.
Benesch understands the Town is seeking a State-licensed Professional Engineer to deliver comprehensive civil engineering 
services under a five-year, task-order-based contract — spanning planning, design and construction administration for the 
replacement of the athletic/running track and baseball and softball fields at the high school/middle school complex, as well 
as on-call support for a year-round restroom at Salmon Brook Park, new pickleball courts and a sewer pump assessment. 
We bring more than technical execution to this partnership; our value methodology experts proactively identify cost-saving 
opportunities and efficiencies at every phase, so the Town gets the most out of every dollar invested. 
 PROVEN EXPERIENCE ON SIMILAR PROJECTS: Our firm’s expertise aligns perfectly to meet the demands of this 
project. In fact, we have a demonstrated track record of successfully completing projects of similar complexity. Our 
recent successful completion of Jess Dow Field Renovations Synthetic Turf Field at Southern Connecticut State 
University (DAS Project BI-RS-369) is a testament to our capacity to excel on projects within this contract’s scope, 
including civil engineering, surveying, and landscape architecture. This project was designed and built within five 
months in time for the upcoming Special Olympics to be held there.
 AVAILABLE LOCAL TEAM WITH DEEP BENCH STRENGTH: Our Glastonbury office is approximately 30 minutes from 
Granby, positioning our team for responsive site visits, stakeholder meetings and construction observation without the 
travel costs or delays. Project Manager Will Walter, PE, is a Windsor resident, just 15 minutes from Granby, giving him an 
intimate familiarity with the local community, regulatory landscape and construction environment that benefits the Town 
from day one. His proximity also means that when an urgent site condition or unexpected challenge arises, Will can be 
on the ground quickly.
 FULL-SERVICE FIRM, WITH IN-HOUSE CAPABILITIES: Benesch offers a robust team of qualified experts with the 
depth of resources to accommodate all tasks associated with this project. Our full-service structure streamlines 
communications and the design process, resulting in efficiencies that save the Town time and money. We have the in-
house expertise to address any challenge that arises during the planning, design and construction of Granby’s athletic 
facilities and on-call infrastructure needs — there is no challenge too large or too specialized for our team. 
Benesch is committed to a true partnership with the Town of Granby throughout the contract term, serving as a trusted 
extension of your staff and a proactive advocate for securing grant funding opportunities that advance your capital 
improvement goals. We appreciate the Town of Granby’s consideration and look forward to the opportunity to serve your 
community. Please do not hesitate to contact us with any questions regarding our qualifications.
Sincerely, 
Will Walter, PE
200 Glastonbury Blvd, Suite 201
Glastonbury, CT 06033
www.benesch.com
P 860-633-8341
PROJECT CONTACT
Will Walter, PE, LEED AP
Project Manager 
P 860-494-4359
E wwalter@benesch.com

Page 8

Please note: This document is designed for double-sided printing. 
Intentional blank pages are included for proper alignment.

Page 9

Client Name // Proposal Name
Cover Letter
Section 1 // Qualifications  ..............................................................  9
   
Section 2 // Project Approach ......................................................... 17
Section 3 // Key Personnel  ............................................................. 21
Section 4 // Relevant Experience  ................................................... 35
   References  .................................................................. 49
Section 5 // Cost Proposal  ............................................................. 53
Table of Contents

Page 10

Please note: This document is designed for double-sided printing. 
Intentional blank pages are included for proper alignment.

Page 11

Section 1:
Qualifications

Page 12

Please note: This document is designed for double-sided printing. 
Intentional blank pages are included for proper alignment.

Page 13

SECTION 1: QUALIFICATIONS
9
Town of Granby // On-Call Engineering Services
WHAT WE DO
Communities 
Community Development | Public Infrastructure  
Private Development | Parks & Recreation
Transportation 
Aviation | Bridges | Railroads | Roads | Transit
Environmental & Water 
Environmental Management | Potable Water   
Storm water | Wastewater
FIRM PROFILE 
Since our founding in 1946, Benesch has specialized in 
providing civil and structural engineering services to our 
clients in transportation and infrastructure development. Our 
founder, Alfred Benesch, brought a collaborative spirit to 
the practice, encouraging the concept of teamwork coupled 
with engineering excellence. As the company grew, so did 
its ability to deliver larger and more complex projects. It 
didn’t take long for Benesch to become known as a leading 
engineering firm, capable of tackling clients’ most complex 
and high-profile projects. When the time came, Benesch 
sought out like-minded organizations—like Massachusetts’ 
Purcell Associates—to expand their expertise and skill set. In 
October 2012, James P. Purcell Associates, Inc., merged with 
Alfred Benesch & Company. 
Today, Benesch offers an expanded range of services— 
guided by the same principles the firm was founded upon 
many years ago. We practice a wide range of engineering 
and professional services for public and private clients across 
the nation. We employ engineers, planners, environmental 
scientists, construction managers, landscape architects, 
surveyors and designers that rank among the highest in their 
professions. Numerous professional accolades have been 
awarded to our employees for outstanding contributions in 
their fields. As a company, we are client-focused – dedicated 
to providing responsive service and committed to quality and 
engineering excellence.
Benesch is ranked among the Top 
500 Design Firms in the country by 
Engineering News-Record.
IN-HOUSE SERVICES
Accessibility & ADA Compliance | Alternate Delivery | Asset 
Management & GIS | Bridge Inspection | Civil/Site | CE&I 
Design | Feasibility/Environmental Studies | Geotechnical 
| Landscape Architecture | Land Survey | Master Planning 
| Operational Analysis | Planning | Program Management 
| Public Finance  | Survey | Traffic & Safety | Value 
Methodology
WHAT WE DO
VALUE FOCUSED. COMMUNITY MINDED. QUALITY DRIVEN.
WHO WE SERVE
Airports | Architects | Contractors | Corporations  
Developers | Federal, State & Local Agencies   
Railroads | Transit Authorities
We routinely tap into our firm’s multidisciplinary 
expertise to support clients across the country. We turn 
our nationwide capacity and expertise into high-value 
solutions for local infrastructure challenges.

Page 14

10
Town of Granby // On-Call Engineering Services
SECTION 1: QUALIFICATIONS
Our New England offices, with a 
staff of 77 (45 in CT and 32 in MA), 
have been in business for over  
50 years. 
Additionally, our Glastonbury Office 
is only about 30 minutes 
away—ensuring responsive 
client service. 
1,200 EMPLOYEES | 49 LOCATIONS | 20 STATES  
1 TEAM
PROJECT SERVICES
Our recent municipal work includes the following communities: In addition to our municipal work, we regularly 
perform design services as on-call consultants 
for the following:
• MassDOT
• UConn - Survey; Civil/Structural
• CT DCS - Civil/LA/Survey
• CTDOT - Bridges and Structures
• CTDOT - Value Engineering and 
Constructability Review
Benesch offers the City a comprehensive suite of in-house services for this contract, including:
• Athletic Field Design
• Civil/Roadway Engineering
• Site Development
• Structural Engineering
• Landscape Architecture
• Land Surveying/GIS
• Inland Wetland Related Services
• Permitting
• Bidding and Construction Services
• Construction Inspection
• Water & Wasterwater
• Grant Writing
• Bloomfield, CT
• Bristol, CT
• East Hartford, CT
• Greenwich, CT
• Hartford, CT
• New Britain, CT
• New Milford, CT
• Newtown, CT
• Norwalk, CT
• Somers, CT 
• Stafford, CT
• Stamford, CT
• Wilton, CT
• Winchester, CT
• Agawam, MA
• Boston, MA
• Chelsea, MA
• Haverhill, MA
• Springfield, MA
• West Springfield, MA
Work for this project will be performed by our Connecticut Staff. This location 
provides for responsive client service and stakeholder coordination.
Connecticut Office 
200 Glastonbury Blvd, 
Suite 201
Glastonbury, CT 06033
P 860-633-8341
Primary Contact:
Will Walter, PE, LEED AP
Project Manager
P 860-494-4359
E wwalter@benesch.com
Benesch Office
Granby
30 minutes

Page 15

SECTION 1: QUALIFICATIONS
11
Town of Granby // On-Call Engineering Services
Benesch has reviewed the Request for Proposal/Qualifications 
prepared by the Town of Granby and understands that we 
may be called on to assist you with a wide variety of services, 
ranging from feasibility studies to construction administration 
and/or inspection services. Our New England offices have 
been in business for over 50 years, during which we have 
held on-call engineering contracts with municipalities 
across Connecticut and Massachusetts, including the cities 
of Hartford, New Britain, Bristol, East Hartford, Enfield, 
Springfield, and West Springfield. 
As an on-call engineer for dozens of municipalities across 
the country, Benesch understands the challenges cities 
and towns face as they strive to improve the quality of 
life for their residents. The nature of on-call contracts 
requires an understanding that assignments may vary 
widely in size, scope and staffing levels. In turn, we must 
not only be responsive to these unique characteristics, but 
knowledgeable of each assignment’s specific needs. Being 
quick, nimble and responsive is Benesch’s key to success.
Benesch has the flexibility and expertise to tackle a wide 
variety of on-call assignments, along with the diversity of in-
house services needed for core civil engineering work. Below 
please find the specific areas of expertise and strengths we 
bring to the design and engineering services assignment. 
GENERAL CIVIL & SITE ENGINEERING SERVICES
Benesch is well versed in all phases and aspects of 
general civil engineering and site development, from 
initial planning and concept through design, bidding and 
construction. We carefully scope the appropriate number 
of phases depending on the complexity of the project. As 
your consultant, we believe in serving as a true partner 
while anticipating your project needs. As issues arise, we 
will come to you immediately — not just with the problem, 
but with at least one well-considered solution. We believe 
in consistent communication, and our practice is built 
around client service. Benesch’s Connecticut-based civil 
engineering group consists of more than 14 professionals, 
including seven licensed engineers with a combined 
150-plus years of experience. We are experts in site 
design, hydrology, hydraulics, drainage and storm water 
management, and erosion and sediment control.
We are also experts in the following documents/codes:
• CT DEEP 2004 Stormwater Quality Manual
• CT DEEP 2000 Erosion & Sediment Control Guidelines
• ConnDOT Drainage Manual
• ADA Requirements 
ROADWAY  ENGINEERING
Benesch provides roadway engineering services ranging 
from spot safety improvements and shoulder 
widening to full corridor reconstruction. Our 
Connecticut work includes multi-phase 
CTDOT roadway projects requiring traffic 
signal design, geometric corrections 
and drainage improvements. 
BENESCH ON-CALL SERVICES

Page 16

12
Town of Granby // On-Call Engineering Services
SECTION 1: QUALIFICATIONS
We are experienced in coordinating with state and local 
agencies to advance projects through design and into 
construction.
We understand the desire of municipalities to provide 
connections via pedestrian and bicycle facilities, as well 
as the design and permitting process, including the 
importance of public participation. We are well versed in 
the requirements that accompany these types of projects 
when federal or state funding is utilized. Our approach has 
resulted in successful recent projects in Newtown, Cromwell, 
New Britain and Hartford. Additionally, we are currently 
involved in the design of sidewalks and other pedestrian 
improvements on Route 5 in East Hartford as part of CTDOT 
CCGP funding.
STRUCTURAL ENGINEERING
Benesch has an in-house infrastructure group consisting of 
six Connecticut-licensed professional structural engineers 
with extensive experience in municipal bridge design. We 
understand the dynamics that drive local bridge projects, 
including structural analysis, hydrologic and hydraulic 
analysis, scour analysis and permitting. We are well versed 
in the rehabilitation of historic bridges and the associated 
requirements for maintaining their aesthetic and historic 
character. We have designed many Connecticut roadway and 
pedestrian bridges and regularly perform bridge inspections 
across the state. Our structural group also regularly designs 
retaining walls, performs building structural assessments 
and provides building design services.
FEASIBILITY STUDIES 
Benesch regularly prepares conceptual plans and feasibility 
studies as part of the feasibility portion of projects. We 
believe these are critical to help clients understand the 
viability of a project before committing design dollars.  We 
review issues such as traffic, utilities, zoning, permitting and 
required acquisitions as part of our up-front analyses. We 
recently completed a feasibility study for the Connecticut 
Department of Administrative Services in which we analyzed 
four sites for the potential placement of a state-of-the-art 
State Forensics Laboratory. The state’s chief architect noted 
it was “one of the best feasibility reports” he had ever seen.
LAND SURVEYING RELATED SERVICES 
Our survey crews are led by licensed professionals with broad 
exposure to the various aspects of surveying. Our staff has 
the depth of knowledge to understand the unique nature of 
any given project. Benesch’s surveyors consistently work 
hand-in-hand with our design group (engineers and landscape 
architects) to provide comprehensive surveys that are useful 
for design. We regularly perform the following surveys:
• A2/T2 site surveys, sufficient for design and permitting 
• Roadway and sidewalk surveys, including right-of-way 
determination
• Ballfield and park surveys
• Preparation of easements – permanent and temporary
• ALTA surveys
• Flood certificates
• Dam surveys
• Utility surveys, including ground penetrating radar
• Land taking documents
• Bridge surveys
Our surveyors and engineers collaborate to ensure 
correctness and completeness of acquisitions for 
construction.

Page 17

SECTION 1: QUALIFICATIONS
13
Town of Granby // On-Call Engineering Services
We are committed to embracing technological advancements 
in the industry to bring further economic benefits to our 
clients. Our GIS staff integrates data from a variety of 
sources, projecting, digitizing and editing GIS and CAD 
data. Blending new technology with an understanding of 
traditional basics allows our survey staff to provide clients 
with an efficient product.
LANDSCAPE ARCHITECTURE RELATED SERVICES 
Benesch’s landscape architecture group works cohesively 
with our engineers to provide comprehensive design and 
placemaking. We believe very strongly in the concept of in-
tegrated design, where engineers and landscape architects 
work hand-in-hand from the very beginning of the project to 
provide comprehensive designs that meet aesthetic, place-
making, functional and usable site requirements.
Benesch’s collaboration on City improvements will 
integrate thoughtful, technically feasible strategies for the 
development of landscape space. 
The Benesch team has a long-standing record of working 
with local communities and public clients to deliver feasible 
and sustainable solutions for improvements to parks, historic 
districts and streets.
Our project strategy is inclusive, grounded in experience 
and sound knowledge of landscape design and construction, 
maintenance practices and the public process. We listen, 
respond and engage — not only with our clients, but with 
all stakeholders within a project. This results in a creative, 
problem-solving exploration that recognizes issues and 
ultimately produces a clear direction for improvements.
INLAND WETLAND RELATED SERVICES 
Wetland permitting is a regular part of our projects, so our en-
gineers thoroughly understand municipal wetlands regulations 
and the application of such as they relate to site constraints 
and design. Our team routinely prepares applications and 
presents municipal wetlands conditions, including wetland 
applications that require state and federal permitting.
PERMITTING 
Local, state and federal permitting are a part of most of our 
projects. We consistently guide projects through this process 
and regularly interact with Zoning Boards of Appeal, Inland 
Wetland Commissions, Planning & Zoning Commissions, 
local advisory boards, CTDOT, CT DEEP, CT DPH and the 
ACOE. We believe in engaging the regulatory agencies at 
an early design stage, in order to address obvious concerns 
or issues. As part of our response to agency comments, 
we prepare comprehensive written responses that directly 
correlate to plan modifications.
COST ESTIMATING 
Benesch utilizes an in-house cost database in conjunction with 
multiple sources, including CTDOT-published data, to produce 
cost estimates. We also utilize our wide network of contractor 
and construction-manager connections to supplement the cost 
databases. In addition, we prepare accurate cost estimates 
and do so as a regular part of our projects.
BIDDING & CONSTRUCTION RELATED SERVICES
We provide bidding and construction services on most of our 
projects. We are very comfortable working with contractors 
and believe it is critical to respond quickly to RFIs, shop 
drawing submittals, field issues in order to keep projects  
moving through construction.
RESIDENT ENGINEERING SERVICES
We have the capability to provide construction inspection, 
administration and testing services. We are familiar with 
CTDOT’s four-book system and are currently providing 
resident engineering services on a CTDOT-funded sidewalk 
project in Norwich, CT. In addition, we are currently providing 
inspection services for projects in Stafford and Wilton.
TAKING A VALUE ENGINEERING APPROACH 
Value engineering (VE) is in our DNA. From the first 
sketch to the final plan, our team is always asking: 
is there a smarter way to do this? Several 
team members hold Value Methodology 
Associate (VMA) credentials or  
regularly participate in VE 
workshops, including proposed 
Project Manager Ryan 
Scrittorale. The result? 
Designs that work 
harder for the City 
of Norwich’s 
budget.

Page 18

14
Town of Granby // On-Call Engineering Services
SECTION 1: QUALIFICATIONS
Benesch confirms its ability to begin work 
on any assigned tasks within 10 days of 
notification from the City. 
Milestone Submittals
Negotiations and/or Approval of  
Price Proposal & Work Plan
Price Proposed & Work Plan Submittal
Scope Verification Meeting
Identify Scope/Schedule Changes
Submit Monthly 
Progress Reports
Monitor Project  
Budget & Schedule
On-Call Design Project Process
Identify Design Team and Conduct  
Internal Scope Review
Request for Design Services
Project Assignment Identified
Perform Design & 
Develop PlansQA/QC
Request for Design Services
Immediately following a design request, Benesch’s 
project manager will set up a meeting or phone 
conference with City staff to discuss project scope, 
schedule and staff availability. 
Key Steps in the On-Call Design Process
Scope Verification Meeting
Once the appropriate staff have been identified by 
the Program Manager, the carefully selected project 
team meets to verify scope.
Price Proposal & Work Plan Submittal
Once an agreed-upon budget, scope and schedule 
are confirmed, each assignment is tracked 
independently. 
Perform Design & Develop Plans
As design and plan development begins, Benesch 
will coordinate all aspects of the project under City’s 
direction or its assigned project manager. 
PROJECT APPROACH/DELIVERY
The chart and brief summaries below outline Benesch’s simple, 
yet effective, approach to managing on-call project services. This 
approach also allows us to track numerous concurrent projects and 
maintain schedules with efficiency and control. We can state with 
confidence our ability to meet contract, time and budget requirements 
agreed upon for each assignment.
EMERGENCY RESPONSE
When time is critical, Benesch moves fast. Urgent 
situations demand a different mindset than traditional 
engineering, and our team is built for it. We have mobilized 
quickly on multiple occasions to assess conditions, 
develop solutions and restore safety when it mattered 
most. The City of Norwich can count on us to be there 
when it matters.
 
For example, following record snowfalls several winters 
ago, Benesch deployed seven structural engineers to 
UConn’s Storrs campus within 24 hours of Notice-to-
Proceed. The team 
evaluated roof conditions 
under historic snow loads, 
performed structural 
analysis of roof framing 
capacity, and coordinated 
with UConn Facilities to 
prioritize snow removal. 
More than 40 structures 
were assessed in a single 
week.
 Benesch structural engineer 
conducting a roof condition 
assessment during record snowfall.

Page 19

Section 2:
Project Approach

Page 20

Please note: This document is designed for double-sided printing. 
Intentional blank pages are included for proper alignment.

Page 21

17
SECTION 2: PROJECT APPROACH
Town of Granby // On-Call Engineering Services
ATHLETIC FIELDS PROJECT APPROACH
A PHASED APPROACH TO COMPLETING THE GRANBY FACILITIES
Benesch’s approach to the Granby Fields Improvements is grounded in our extensive experience delivering athletic projects 
for many municipalities. Our work is structured to complete the final design while protecting schedule, budget, and community 
relationships.
This approach reflects how Benesch has successfully executed prior projects—including feasibility, design, permitting, and 
construction support—by combining disciplined phasing with early technical validation and continuous coordination with 
stakeholders. Throughout the project, Benesch will work in close integration with Silver Petrucelli + Associates (SPA) to deliver 
a unified site, athletic, and architectural solution.
PHASE 1 — PROJECT INITIATION & PRE-DESIGN 
CONFIRMATION
Following contract award, Benesch will initiate the project 
with a structured pre-design effort focused on confirming 
assumptions, validating site constraints, and aligning the team 
on delivery strategy.
Work in this phase will include a formal project kickoff meeting 
with the stakeholder and the consultant team to confirm  
scope, communication protocols, and decision authority. 
Benesch will establish biweekly project management 
meetings, which will continue throughout the duration of the 
project, providing a consistent forum for coordination, issue 
resolution, and schedule control.
During this period, Benesch will review the program and 
available survey and utility information. Site reconnaissance 
will be performed to verify existing conditions, utility 
easements, access constraints, and athletic field fit relative 
to governing body standards. A critical outcome of this phase 
will be confirmation of the procurement path for athletic field 
systems, including whether the project will proceed through a 
traditional competitive bid or utilize the CT CREC Cooperative 
Purchasing Marketplace.
PHASE 2 — DESIGN DEVELOPMENT 
Traditional Competitive Bid Path
Under a conventional Design-Bid-Build delivery, Benesch will 
advance the project through Design Development. During 
this phase, the design will be developed to clearly define 
field layouts, grading, drainage, lighting, circulation, and site 
utilities while maintaining flexibility for competitive bidding.
Design efforts will focus on establishing durable, 
maintainable athletic surfaces; protecting the long-term 
performance of synthetic turf through appropriate base and 
stormwater design; and coordinating pedestrian access, 
accessibility, and security. Lighting design will include 
photometric analysis to manage spill and glare at the site 
perimeter and along adjacent public pathways.
Cost alignment will be managed through continuous budget 
reconciliation and identification of bid alternates to maintain 
procurement flexibility.
CREC COOPERATIVE PURCHASING PATH (PRE-
SELECTED VENDOR)
If the town elects to utilize the CREC Cooperative Purchasing 
Marketplace, Schematic Design and Design Development will 
be consolidated into a single Design Development phase, 
consistent with allowances for pre-selected systems.
In this scenario, Benesch will work directly with the selected 
manufacturer (AstroTurf, Shaw, or FieldTurf) to integrate system-
specific requirements for turf, base construction, drainage, 
and warranties. This approach reduces procurement risk, 
accelerates decision-making, and allows the design team 
to focus on constructability and coordination rather than 
redundant specification development. Importantly, this delivery 
path does not reduce permitting or documentation rigor.
PHASE 3 — PERMITTING & REGULATORY 
COORDINATION (PARALLEL WITH DESIGN)
Permitting and regulatory coordination will proceed in 
parallel with design to avoid downstream delays. Benesch 
will lead this effort on behalf of the town, coordinating with 
all Authorities having jurisdiction.
This phase will include coordination with local land use 
agencies as required, including Planning and Zoning and 
the Inland Wetlands and Watercourses Commission. Even 
where work is anticipated to be outside regulated resources, 
Benesch will prepare documentation necessary to obtain 
formal jurisdictional determinations. 

Page 22

18
Town of Granby // On-Call Engineering Services
SECTION 2: PROJECT APPROACH
Use of a CREC cooperative contract will not bypass any 
permitting or approval requirements; Benesch will remain 
responsible for integrating vendor systems into a fully 
permitted project.
PHASE 4 — CONSTRUCTION DOCUMENTS
Following completion of Design Development and permitting 
coordination, Benesch will prepare Construction Documents 
suitable for public bidding or cooperative procurement. 
Documents will be developed with an emphasis on clarity, 
constructability, and phasing to support uninterrupted campus 
operations.
Deliverables will include coordinated civil, athletic, and 
site plans; detailed turf system sections aligned with the 
selected procurement path; grading, drainage, lighting, 
and utility documentation; and clear bid alternates where 
applicable. This phase will culminate in the town’s review and 
authorization to bid.
PHASE 5 — PROCUREMENT & BIDDING
Benesch will support the town throughout the bidding or 
procurement process by responding to bidder questions, 
preparing addenda, and assisting with bid evaluation and 
constructability review. Our role during this phase is to 
protect the integrity of the documents and confirm alignment 
between the design intent and contractor proposals.
PHASE 6 — CONSTRUCTION ADMINISTRATION
During construction, Benesch will provide construction 
administration services focused on quality control, schedule 
adherence, and coordination among all parties. Our 
approach is informed by direct experience delivering athletic 
facilities under tight seasonal constraints.
At Southern Connecticut State University’s Jess Dow Field, 
Benesch surveyed, designed, and supported construction 
of a new track and field within a minimal off-season 
window, carefully phasing work adjacent to Special 
Olympics programming and maintaining uninterrupted 
athletic operations. That same disciplined approach—tight 
sequencing, frequent communication, and rapid issue 
resolution—will be applied in Granby.
ONGOING COORDINATION & PROJECT GOVERNANCE
Throughout all phases, Benesch will maintain biweekly project 
meetings, clear documentation of decisions and action items, 
and continuous coordination with SPA, DAS, and CTECS. This 
structure ensures transparency, accountability, and steady 
progress from project initiation through closeout.

Page 23

Section 3:
Key Personnel

Page 24

Please note: This document is designed for double-sided printing. 
Intentional blank pages are included for proper alignment.

Page 25

21
SECTION 3: KEY PERSONNEL
Town of Granby // On-Call Engineering Services
ARCHITECTURE/BUILDING
David Stein, AIA (SPA)*
Dean Petrucelli, AIA (SPA)
Silver Petrucelli + Associates (SPA)
SP+A is an award-winning, integrated architecture, engineering, and interior design firm recognized for its positive 
community impact. The firm’s expertise spans historic preservation, state-of-the-art learning facilities, modernized 
workspaces, and public safety and civic projects such as libraries, senior/community centers, and municipal buildings. 
SP+A delivers new construction, renovate-as-new, expansions, repairs, code conformance improvements, HVAC and 
electrical system design, and window, door, and roof replacements. Advanced technologies are fully integrated in-house 
to enhance design and construction, with a strong commitment to sustainability and LEED-inspired, resource-efficient 
solutions. Over three decades, SP+A has grown organically, building a dedicated team and earning repeat business from 
clients who value their design excellence and innovative, process-driven approach.
TOWN OF GRANBY
PROJECT MANAGER
Will Walter, PE*
STRUCTURAL ENGINEERING
Mark Habek, PE, VMA* 
Task Leader
Slawomir “Swavek” Lachcik, PE
Subal Das, PE
Charles Sorensen, PE
Alyssa Bisi, EIT
CONSTRUCTION 
ADMINISTRATION, INSPECTION 
& MANAGEMENT
David Hines, PE*
Task Leader
J. Matthew Remchuk
David Locke, PE
James Murcia, EIT
LAND SURVEYING
David Caricchio, PLS*
Task Leader
Lucas Bell, LSIT
Paul Charette
Nick Caricchio
LANDSCAPE ARCHITECTURE
Ryan Deane, ASLA, PLA*
Task Leader
Thomas Swale, PLA
Andrew Woodward, PLA
CIVIL/SITE/LAND DEVELOPMENT
Nancy Levesque, PE, CFM*
Task Leader
Ryan Scrittorale, PE
Greg Lachcik
Delaney Pilotte
Connor McNamara, EIT
GRANT WRITING
Freddy Vasquez, AICP
Project Manager Will Walter, PE, LEED AP has 25 years of experience in various facets of survey and 
site/civil design. He will lead a dedicated in-house team of professionals with decades of municipal design 
experience. Will regularly manages complex, multi-disciplined projects, including design and oversight of 
the entire permitting and design process associated with land development and roadway reconstruction. In 
addition, he is experienced in the provision of construction inspection and erosion and sediment inspection 
services, having performed this task on numerous development projects. As a Windsor resident and user 
of Salmon Park, Mr. Walter will have the park and the Town of Granby in his best interest throughout the 
entirety of the project.
WASTERWATER COLLECTION 
SYSTEMS
Stephen Roth, PE, CAMP*
Task Leader
Nancy Levesque, PE
Ryan Scrittorale, PE
Connor McNamara, EIT
WATER DISTRIBUTION SYSTEMS
Michael Peleschak, PE*
Task Leader
AJ Toloza, PE
Ryan Scrittorale, PE
Nancy Levesque, PE
Rocco Cirilli
M/E/P ENGINEERING
Robert Banning, PE (SPA)*
Kenneth Eldridge, PE (SPA)
Subconsultant

Page 26

22
Town of Granby // On-Call Engineering Services
SECTION 3: KEY PERSONNEL
William Walter, PE, LEED AP
Role: Project Manager
Classification: Project Manager
Education
Bachelor of Science - Civil 
Engineering Worcester 
Polytechnic Institute
Years of Experience: 25
Registrations and Certifications
Professional Engineer: CT 
(#23146); RI (#12234);  MA 
(#54033); NY (#103192)
LEED® Accredited Professional
Will leads the Site Development Group of Benesch’s Glastonbury office. He is well versed in all 
aspects of land development and he brings over 25 years of design and project management 
experience for public and private clients to his work. Key areas of expertise include planning, 
permitting, site demolition, grading and drainage, utilities, erosion & sediment control, and 
construction phase services. He is experienced in total site design, meeting criteria and 
performance standards for numerous local, state, and federal guidelines, including requirements 
for: local zoning and inland wetlands; state DOT stormwater design; state DEEP stormwater 
quality and erosion and sediment control; federal NPDES; and LEED requirements. Will regularly 
manages complex, multi-disciplined projects, including design and oversight of the entire 
permitting and design process associated with land development and roadway reconstruction. In 
addition, he is experienced in the provision of construction inspection and erosion and sediment 
inspection services, having performed this task on numerous development projects.
Friends Academy Synthetic Turf Field – Locust Valley, NY
Project Manager: Oversaw the design, permitting and construction oversight of erosion 
control and drainage associated with a multi-use synthetic turf field. The drainage overcame 
the challenge of unsuitable soils and no natural drainage path through the use of a robust 
stone reservoir under the turf, a perimeter collector trench, and conveyance facilities.
Pingry School Synthetic Turf Field – Millburn, NJ
Project Manager: Managed the design, permitting and construction oversight of erosion 
control and drainage associated with a natural grass, multi-use conversion to synthetic turf. 
The field was partially located in a flood plain and also required extensive  underground 
detention to meet New Jersey DEP requirements.
Bowen Field at Beaver Pond Park – New Haven, CT
Project Manager: Improvements to Bowen Field in New Haven included a new, synthetic 
turf field with overlapping soccer and football, an 8-lane, 400 meter synthetic running track, 
renovated western grandstands, new athletic field lights, and other appurtenances. Existing 
maintenance buildings were evaluated for potential renovation and building additions to 
complement the athletic use of an adjacent high school.
O’Brien Stadium/Windsor High School Athletic Facility – Windsor, CT
Civil Engineer: Provided design and construction oversight of renovations to the athletic 
facility at the O’Brien Stadium Field. The fully renovated facility includes a new competitive 
running track for track and field events, an all-weather, multi-purpose, synthetic-turf field, 
a natural grass practice football field, a press box, home and away bleachers, a multi-sport 
scoreboard, walkways, fencing, and miscellaneous improvements to the site. Worked through 
programming with the Athletic Director and Town stakeholders, local permitting, and a series of 
Town meetings ultimately gaining approval of the project funding at a Town-wide vote. 
LP Wilson Community Center Fields – Windsor, CT
Project Manager for the design of approximately 11 acres of natural grass field renovation. 
The existing fields at LP Wilson Community Center were removed due to water issues and 
poor playability. The project redesign incorporated soil renovation, grading, drainage and 
groundwater-lowering measures to successfully provide soccer, field hockey and baseball/
softball fields for the community. 
East Hartford On-Call Contract for Surveying and Civil Engineering
Project Manager for the currently on-going on-call contract, which includes oversight of the 
management and design of assignments, coordination with the City’s project manager, and 
adherence to City standards and requirements. Recent projects include the Route 5/502 
Intermodal Facilities Improvements and the Pitkin Street Survey.
Will’s extensive athletic field 
experience also includes:
• Loomis Chaffee Field Hockey 
Field – Windsor, CT
• Wesleyan Smith Field Turf 
Renovation – Middletown, CT
• Crosby High School Athletic 
Facility – Waterbury, CT
• Bowen Field at Beaver Pond Park 
– New Haven, CT
• Bunnell High School Track 
Rehabilitation – Stratford, CT
• New Milford High School 
Synthetic Turf Fields – New 
Milford, CT

Page 27

23
SECTION 3: KEY PERSONNEL
Town of Granby // On-Call Engineering Services
Education
BS, Landscape Architecture and 
Regional Planning - University of 
Massachusetts, Amherst
AS, Environmental Sciences and 
Human Ecology - Greenfield 
Community College
Years of Experience: 21
Registrations and Certifications
Professional Landscape  
Architect: Connecticut (#1088)
Massachusetts (#4371)
Maine (#LAR5385)
New York (#003002)
Rhode Island (#718)
Ryan C. Deane, PLA
Role: Landscape Architect Task Leader
Classification: Chief Engineer
Ryan has 20 years of experience in athletic field design, master planning, sustainable design, 
and construction administration. He has worked on and managed over 20 athletic projects 
and is intimately familiar with the programming and design necessary for synthetic turf and 
tennis court projects. Ryan is well-versed in the nuances of synthetic turf, line striping and 
layout of multi-use fields and tennis court surfacing options.
Friends Academy Synthetic Turf Field – Locust Valley, NY
Landscape Architect & Project Manager: Responsible for the campus master plan and 
athletics master plan, which led to the design and documentation for a new multi-purpose, 
synthetic-turf field, which was integrated into the grounds of the Friends Academy campus. 
Ryan was responsible for the design and project management.
Jess Dow Field Renovations – Southern Connecticut University
Landscape Architect & Project Manager: Benesch performed a boundary and topographic 
survey for the entire stadium. Underground utility location, utility research and field location 
of all site amendments were also provided. Benesch also performed an evaluation of 
all hardscape, softscape, stormwater, and utilities on site and prepared a written report 
documenting the existing conditions of all applicable site items. Benesch is currently 
providing civil-related design and permitting services, including erosion control, stormwater 
and utility design.
Pingry School Synthetic Turf Field – Millburn, NJ
Landscape Architect & Project Manager: New synthetic-turf field for lower school students 
in close proximity to wetlands. Ryan provided the design and project management for the 
synthetic field, as well as construction administrative services.
Bulkeley High School Renovation – Hartford, CT
Landscape Architect: As part of a complete 20-acre renovate-as-new project, the design 
included replacement of an existing track and natural grass field with a new track and synthetic 
turf field. Additionally, this project included the replacement of existing tennis courts.
Greenwich Country Day School Synthetic Turf Fields – Greenwich, CT
Landscape Architect & Project Manager: Design of campus included siting of four new 
buildings, campus loop road, parking, a wastewater treatment facility and two synthetic-turf 
fields. A multi-use, synthetic-turf field for the Stanwich School was constructed in 2011 and 
required substantial earthwork and permitting. The second phase of campus development 
included a synthetic football field with a scoreboard, uprights and lacrosse netting. This field 
was substantially completed in 2019.
Nonnewaug High School – Woodbury, CT
Landscape Architect & Project Manager: Project included sitework scope of a new 
synthetic-turf, multi-purpose field; resurfaced, synthetic track; renovation of all natural-turf 
baseball, softball, soccer and field hockey fields, post-tension tennis courts, and various 
other campus improvements. Ryan was responsible for the design and documentation of the 
athletic elements, as well as project management.
CREC Public Safety Academy – Enfield, CT
Landscape Architect: As part of a new school facility, the project provided a new, multi-
purpose, synthetic-turf field, and a 6-lane synthetic running track. The project included new 
drainage, and striping for field events.

Page 28

24
Town of Granby // On-Call Engineering Services
SECTION 3: KEY PERSONNEL
Education
BS, Civil Engineering -  
University of Connecticut
Years of Experience: 31
Registrations and Certifications
Professional Engineer: CT 
(#0022165)
Certified Floodplain Manager 
(CFM)
Professional Affiliations
American Public Works 
Association
Association of State Floodplain 
Managers
Nancy Levesque, PE, CFM
Role: Civil, Site and Land Development Task Leader
Classification: Chief Engineer
Nancy has more than 30 years of civil engineering experience supporting municipal, 
institutional, and site development projects. Her expertise includes site/civil design, 
stormwater management, drainage, permitting, and quality assurance for complex public-
sector projects. Nancy has extensive experience reviewing plans and specifications for 
completeness, constructability, and regulatory compliance, with particular strength in 
projects involving school campuses, residential developments, utility coordination, access 
and circulation improvements, and site amenities. Her background as a former city engineer 
for Bristol, CT, gives her a practical understanding of municipal review processes, public 
infrastructure needs, and implementation challenges. On this contract, Nancy will support 
assignments involving land improvements, site/civil engineering, drainage and stormwater 
systems, and quality review.
Flood Protection System Projects – West Springfield, MA
Senior Civil Engineer: Multiple projects related to the City’s Flood Protection System 
(FPS). The projects are being performed as part of Benesch’s on-call contract with the 
City, and specifically to maintain compliance with the Army Corps of Engineers (ACOE) FPS 
requirements. Projects included Quarterly Inspections, Annual Maintenance Bid Set, CCTV 
Inspections, Concrete Wall Repair Bid Set, Relief Well Inspection and Monitoring.
Elmwood Community Center, Design – West Hartford, CT
Senior Civil Engineer: Benesch is leading the site design for the Elmwood Community Center 
in West Hartford, aiming for LEED Gold certification. The project integrates sustainable 
design with community engagement, featuring storm water systems, rain harvesting, and 
accessibility focused amenities. Situated in Beachland Park, the center will serve all age 
groups. Benesch’s comprehensive services include civil engineering, traffic engineering, 
and landscape architecture, ensuring compliance with environmental regulations and local 
permitting requirements.
North Main Street Streetscapes – Bristol, CT
QA Reviewer: This project advances Bristol’s revitalization by building on initial efforts such 
as right-of-way and easement surveys, conflict identification, and a Traffic Impact Study 
that included turning movement, pedestrian, and traffic counts at four intersections, as well 
as capacity analyses for current and future conditions. Benesch is developing plans and 
details for roadway and streetscape, drainage and utilities, pavement markings and signage, 
lighting, maintenance and protection of traffic, landscaping, quantity takeoffs, and cost 
estimates. A Public Outreach Program is also being developed to incorporate stakeholder 
concerns into the design. Nancy provides quality assurance reviews.
Site design for Fire Station #3 – Bristol, CT
Senior Civil Engineer for the design of a new fire station, which replaced the inadequate
existing fire station servicing a local neighborhood in Bristol, Connecticut. The new fire
station expanded fire services and provided other services to the community. Site design
included demolition, erosion control, phasing, site layout, site circulation/parking, grading/
drainage, utilities, landscaping and lighting. The project required site plan approval.
Site design for a New Firehouse – Norfolk, CT
Senior Civil Engineer for the design of a new fire station, located at the same site as the
existing, dilapidated and inadequate fire station in Norfolk, Connecticut. Site design included
demolition, erosion control, phasing, site layout, site circulation/parking, grading/drainage,
utilities, landscaping and lighting. The project required local inland wetlands and site plan
approval permits.

Page 29

25
SECTION 3: KEY PERSONNEL
Town of Granby // On-Call Engineering Services
Education
Associate of Science, 
Architectural and Civil Drafting 
and Design, Porter and Chester 
Institute
Years of Experience: 43
Registrations and Certifications
Professional Land Surveyor: 
Connecticut (#LSX.0070036); 
Maine (2265)
Field Survey Technology 
Equipment
• Trimble S6 Robotic Total 
Station
• Trimble G.P.S. R10 GNSS 
Receiver
• Civil 3D 2014
As Senior Surveyor in Benesch’s Glastonbury, Connecticut Office, Dave serves as project manager 
for all of our surveying projects. A licensed professional Land Surveyor in Connecticut and Maine, 
he has over 40 years’ experience in the field. Along with providing client liaison and overseeing 
the survey team, Dave’s expertise encompasses ALTA/ACSM, bathymetric, boundary, record, 
topographic, landfill, utility, wetlands location, and G.P.S. surveys; aerial photogrammetric 
control; construction layout; condominium plans: environmental land use restriction plans (ELUR); 
easement plans; land records research; legal descriptions, and right-of-way and taking plans. He 
is proficient in all phases of field and office survey work as well as with survey instrumentation, 
G.P.S. equipment, robotic total station, data collectors, and with Civil 3D software. 
Annie Fisher Baseball, Football and Soccer Development Plan – Hartford, CT
Senior Surveyor: Benesch services included a Boundary and Topographic Survey of the 
existing natural grass football field and grading and drainage improvements to support the 
new synthetic turf baseball, football and soccer complex with additional site features. Local 
permitting included Floodplain, Inland Wetlands and Planning & Zoning commission review. 
Dave provided oversight of all surveying efforts associated with the project.
Blackham School Baseball Field Renovation – Bridgeport, CT
Senior Surveyor: FIELDS, Inc.—working in conjunction with Baseball Hall of Famer, Cal Ripken 
Jr’s., Foundation—retained Benesch to provide engineering and survey services for this urban 
athletic facility. Services included boundary and Topographic survey of existing three field 
complex, grading and drainage improvements to support the new synthetic fields and site 
features, and local permitting. Dave oversaw all surveying efforts associated with the project.
Hyland Park Baseball and Soccer Development Plan – Hartford, CT
Senior Surveyor: FIELDS, Inc.—working in conjunction with Baseball Hall of Famer, Cal 
Ripken Jr’s., Foundation—retained Benesch to provide engineering and survey services for 
this urban athletic facility. Services included Boundary and Topographic Survey of existing 
natural baseball field, grading and drainage improvements to support the new synthetic 
turf baseball and soccer field with additional site features, as well as local permitting. Dave 
oversaw all surveying efforts associated with the project.
Luis Munoz Marin School Baseball and Football Field Renovation – Bridgeport, CT
Senior Surveyor: Dave oversaw all surveying efforts associated with the project. Survey services 
included Boundary Survey, Lot Consolidation Plan and Topographic Survey of existing multi-use 
grass fields. Civil services included grading and drainage improvements to support the new 
synthetic baseball and football fields with additional site features, as well as, local permitting. 
Trinity College Survey & Design Services – Hartford, CT
Senior Surveyor: Dave oversaw all surveying activities on 40± acres of Trinity College’s 
campus. Along with providing critical information for individual design projects, the surveys 
respond to the College’s intention to create a campus-wide map. Complete, on-the-ground 
field surveys were conducted along Ferris Road and Crescent Street; the site of the new Music 
Hall; tennis courts; and athletic fields and include the following systems: steam condensate; 
13.8 kV electrical power; 4160 Volt Emergency Power; domestic water; fire water; chilled water; 
sanitary sewer; storm drainage; natural gas; telephone/data; security cameras; and blue lights. 
Also provided survey with underground utility mark-out to create a 3D representation of the 
existing underground utilities as part of the Bookstore Enabling project. 
David A. Caricchio, PLS
Role: Survey Task Leader
Classification: Technician Support

Page 30

26
Town of Granby // On-Call Engineering Services
SECTION 3: KEY PERSONNEL
Mark has 14 years of structural engineering experience and currently serves as the project 
manager for bridge projects in our Glastonbury office. He has been involved in design and 
analysis of steel, timber, and reinforced concrete structural framing elements. Mark also 
works on CTDOT projects associated with the State’s List Bridge and Local Bridge programs. 
Additional expertise includes structural evaluations, facilitating Value Engineering studies, and 
providing on-call engineering services for state and local agencies.
Structural Evaluation, On-Call Engineering Services – East Hartford, CT
Designer: Mark provided carport structural evaluation for the town of East Hartford. Mark 
inspected cold-formed steel structures which supported solar panels, looked for any signs 
of deterioration or overstressed members due to snow and wind loads, and looked for any 
impact that the post-construction addition of snow guards had on the cold-formed steel 
framing members. He noted his findings, designed repairs, and wrote a report on his findings 
and how the structure should be repaired. 
Elm Street Structural Assessment, On-Call Engineering Services– Springfield, MA
Designer: Mark assisted with the structural assessment of this historic building as part of 
the city’s renovation and redevelopment efforts. Work included evaluation of representative 
beams, columns and wall sections under code-specified loading conditions for both existing 
and proposed use, covering life safety and property protection considerations. 
Case Avenue Bridge Rehabilitation over the Mad River – Winchester, CT 
Lead Project Engineer/Assistant Inspector: The rehabilitation of this single-span, steel multi-
girder structure includes full deck replacement, repainting of the superstructure, roadway 
profile adjustments and installation of new sidewalks on either side. New contemporary 
three-rail tube bridge railings and decorative streetlights were installed to coordinate with 
the downtown Winchester streetscape. Mark was responsible for bridge design, bridge 
rehabilitation plans, construction cost estimates, and design services during construction. He 
also assisted with inspection and oversight during construction.
West Cedar Street Bridge #2 over Five Mile River – Norwalk, CT
Project Manager/Structural Engineer: Benesch is designing a full replacement for this historic 
single-span closed-spandrel masonry arch bridge with a cantilevered sidewalk. The new West 
Cedar Street Bridge #2 will widen the roadway, adding shoulders and sidewalks to accommodate 
pedestrians on the main structure. A separate standalone pedestrian bridge will provide 
pedestrian access throughout construction. Mark was responsible for bridge design, bridge 
replacement plans, construction cost estimates, and environmental permitting services.
Construction Inspection, Sound Beach Avenue over Cider Mill Brook – Greenwich, CT 
Assistant Inspector: Benesch provided construction inspection services for this LOTCIP-funded 
bridge replacement project. Mark assisted with inspection and oversight in accordance with 
the CTDOT’s Construction Manual guidelines. 
Middletown Municipal Parking Garage Improvements - Middletown, CT
Designer: Benesch conducted a Structural Condition Survey of the existing municipal parking 
garage and prepared a report of findings in 2010. No significant maintenance was performed 
on the structure between 2010-2014, resulting in the deterioration of the parking deck. 
Benesch responded to the City’s request for services to upgrade these areas in 2014 by 
providing design plans and cost estimates for several project alternates, and construction 
administration and inspection services for the garage’s repair. Mark provided structural 
evaluation for this project, inspecting the wearing surface and concrete deck on the structure, 
as well as the concrete columns and beams supporting the garage. He also provided design 
repair details for the deteriorated garage, along with drawings and details showing the 
deteriorated areas and how they should be repaired. 
Mark Habek, PE, VMA
Role: Structural Task Leader
Classification: Chief Engineer
Education
BS, Civil Engineering - 
Northeastern University
Years of Experience: 14
Registrations and Certifications
Professional Engineer: CT  
(#0031019)
SAVE International Value 
Methodology Associate (VMA)
AMTRAK Certified Safety 
Inspector
Professional Affiliations
American Council of  
Engineering Companies
Awards/Recognition
ACEC 2023 Emerging Leader of 
the Year

Page 31

27
SECTION 3: KEY PERSONNEL
Town of Granby // On-Call Engineering Services
Dave brings significant experience in structural design, construction management and 
inspection, and infrastructure inspection to his work. His expertise includes list bridge and 
federal and local projects under CTDOT, ranging from small culverts to large multi-span 
highway bridges. He has performed structural calculations and design work, detailed new and 
rehabilitated bridges in AutoCAD and MicroStation, and has extensive estimating experience, 
including using Estimator. In the capacity of construction inspection, David has served in roles 
culminating at resident engineer and chief construction inspector on a variety of infrastructure 
projects in Connecticut and Massachusetts, with clients ranging from local municipalities to 
CTDOT, CAA and DCS, most recently as a chief inspector on a nearly $100M Design-Build bridge 
replacement and highway improvement project over MNRR in one of the most heavily traveled 
portions of the state, both for vehicles and commuter rail.
New London Turnpike Complete Streets – New London, CT
Chief Inspector for this Benesch project incorporating new sidewalks, bicycle lanes and 
pedestrian improvements along New London Turnpike from Town Street to Salem Turnpike 
(Route 82) for a total project length of approximately 12,825 feet. The scope also includes 
restriping pavement markings, railroad at-grade crossing improvements, and minor drainage 
improvements. David is providing construction inspection services. 
Bridge Preservation Project – Litchfield, CT
Chief Inspector for the preservation of Bridge Nos. 05181, 05182, 05183 and 06167 in 
Litchfield, CT, one of the first bridge preservation projects funded under the federal Local 
Bridge Program. Responsibilities included managing the CTDOT four-book system, materials 
testing coordination, quantity computations, record keeping, change order processing, 
field supervision of the contractor and subcontractors, progress meetings and reports for 
the town and CTDOT, daily work reports, schedule coordination, estimate compiling and 
stakeholder meeting administration.
State of CT Renovations to Lot B and Additional Parking, Manchester Community 
College – Manchester, CT
Senior Inspector for this Connecticut Department of Construction Services (CTDCS) project, 
replacing a 13-acre parking lot, cutting a new roadway through woodland, and performing 
extensive new drainage and sidewalk construction. Oversaw the day-to-day field work, 
checked for plan conformance and quality control; supervised junior inspectors and testing 
personnel, and maintained detailed records of the work being performed; coordinated with 
the Project Engineer and Project Manager to keep everyone apprised of progress and acted 
as the first line of defense for field and construction issues.
City of Springfield Tornado Damage Infrastructure Repair Project – Springfield, MA
Construction Inspector for this infrastructure project, consisting of new sidewalks, 
ADA ramps, curbing and pavement restoration. Responsibilities included record keeping, 
managing pay requisitions, scheduling, and overall quality control and oversight of 
workforces.
Connecticut River Dike Improvements – West Springfield, MA
Construction Inspector for the fast-tracked installation of over 50 relief wells for the Town 
of West Springfield and the Army Corps of Engineers. Responsibilities include record keeping 
and inspection.
David Hines, PE
Role: Construction Inspection Task Leader
Classification: Chief Engineer
Education
M Eng, Civil Engineering, 
University of  Hartford
BS, Civil Engineering, Syracuse 
University
Years of Experience: 20
Professional Licenses/
Registrations
Professional Engineer: CT 
(#28369)
NETTCP HMA Paving Inspector 
#3715
NETTCP Soils & Aggregate 
Inspector #2104
NETTCP Concrete Inspector 
#2041
ACI Concrete Field-Testing Tech 
Grade 1 #02216769
ACI Troubleshooting Concrete 
Construction SCM-17(08)
OSHA 40HR HAZWOPER, 2019
OSHA 8HR HAZWOPER 
Refresher, 2025
OSHA 10HR Construction  
Safety & Health, 2015
OSHA Confined Space, 2009
American Traffic Safety Services 
Association (ATSSA) Traffic 
Control Supervisor

Page 32

28
Town of Granby // On-Call Engineering Services
SECTION 3: KEY PERSONNEL
Mr. Roth has over 23 years of experience as a project manager and design engineer 
on wastewater projects involving sanitary sewers, wastewater treatment, pumping and 
storage. Some of his first projects included construction inspection services for the Mill 
Creek Interceptor Sewer in Johnson County and the Piper Creek Interceptor Sewer in 
Wyandotte County. Both of these projects built his solid foundation in the principles of 
sewer construction, greatly influencing his design career. Past projects include new sewer 
construction, sewer modeling and rehabilitation to lift stations and treatment plants. 
Mr. Roth’s wastewater experience includes new sewer construction, sewer modeling and 
rehabilitation, lift stations and treatment. Many of these projects included an in-depth 
analysis of existing infrastructure with an emphasis on proposing multiple design solutions to 
reach the most effective solution for his clients.
• Unified Government of Wyandotte County and Kansas City, KS - Edgewood Interceptor
• City of McPherson, KS - Centennial Phase I/II Interceptor Sewers 
• Unified Government of Wyandotte County and Kansas City, KS - Jersey Creek Inflow/
Infiltration (I&I) Study
• City of McPherson, KS - Lift Station No. 4 Replacement
• Unified Government of Wyandotte County and Kansas City, KS - WWTP No. 20 Scum Pump 
Replacement 
• Unified Government of Wyandotte County and Kansas City, KS - Kaw Point WWTP Sludge 
Pump Replacement 
Unified Government of Wyandotte County and Kansas City - CID Pump Station & Force 
Main Rehab and Septage Receiving Station
Project Manager: The project involved rehabilitating Pump Station No. 2 serving the Central 
Industrial District, including upgrades to the pump station, septage receiving station, 
and approximately 1,475 linear feet of 24-inch cast-iron force main. The work addressed 
reliability concerns, modernized aging infrastructure, and improved operational efficiency 
while maintaining service to a critical combined sewer area. 
12th and Mill Street Flood Pump Stations - City of Kansas City, KS
Project Manager: Included two flood pump stations in Kansas City, Kansas. The main 
focus of the project was to increase the capacity of the station as much as possible while 
still utilizing as much of the existing structure as possible. As a result, Benesch replaced 
the existing dry pit pumps with vertical turbine mixed flow pumps in a new wet pit. This 
modification resulted in a four-fold increase in pumping capacity.
Pump Station No. 2 Rehabilitation - City of Kansas City, KS
Project Manager: Performed a complete rehabilitation of Pump Station No. 2 (PS2) including 
new pumps, motors, controls and electrical components. To allow this 12 MGD pump station 
to be out of service throughout the construction period, a bypass pumping plan had to be 
developed. The solution that was developed included a combination of using the pump 
station wetwell, nearby combined sewers and a flood pump station to convey the sewerage 
safely to the nearby Kaw Point Treatment Plant. The combined sewers allowed the design 
team to minimize pumping costs, disturbance to traffic and maintenance during the pump 
station shutdown period.
Sycamore Underpass Stormwater Pump Station - City of Grand Island, NE
Quality Control: Steve investigated rehabilitation/replacement options for the existing 
Sycamore Street Stormwater Pump Station. A new pump station was designed adjacent to 
the existing station that would place the equipment most in need of servicing aboveground, 
providing better access for maintenance.
Stephen Roth, PE, CAMP
Role: Wastewater Collection Systems Task Leader
Classification: Chief Engineer
Education
BS, Civil Engineering, University 
of Kansas
Years of Experience: 29
Registrations and Certifications
Professional Engineer: KS 
(#16797); MO (# 2005000037); 
NC (#43401) 
Certified Asset Management 
Professional (CAMP)
Certificate in Asset Management 
Planning, IPWEA
Professional Affiliations
American Water Works 
Association – Kansas
The American Council of 
Engineering Companies of 
Kansas
The American Council of 
Engineering Companies of 
Missouri

Page 33

29
SECTION 3: KEY PERSONNEL
Town of Granby // On-Call Engineering Services
Michael Peleschak is a Project Manager with more than 26 years of experience specializing in 
drinking water infrastructure planning, design, and construction for municipal water systems 
and authorities. His experience includes the design and rehabilitation of water treatment 
facilities, water storage tanks, transmission and distribution systems, and system-wide water 
supply planning studies. Mike has extensive experience assisting municipalities with regulatory 
compliance, funding programs, and infrastructure implementation through agencies such as 
PENNVEST, PADEP, and federal funding programs. He has successfully guided numerous water 
infrastructure projects from planning and feasibility analysis through final design, permitting, 
and construction. 
Mahanoy Township Authority Water Distribution Upgrades, Schuylkill County, PA
Project Engineer: Design of water mains (approximately 21,000 lf). Design included the 
connection of 1,300 service connections, 44 fire hydrants, and associated appurtenances. 
Responsibilities also included the assistance in preparing the funding application, cost 
estimate, and the preparation of the bidding specifications, as well as the oversight of an entry-
level designer. Responsibilities during construction included review of applications for payment 
and oversight of the jobs. 
PA DGS, Selinsgrove Center, Water Filtration Plan – Selinsgrove, PA
Lead Engineer: Project consists of designing a new potable water filtration facility for the 
PA DGS Selinsgrove Center. Other elements include ion exchange, chemical addition, new 
electrical service and SCADA systems. The project also includes replacement of portions of 
the distribution system piping, 38 fire hydrants and main distribution valves. Responsibilities 
included overseeing design and permitting activities that involved e-Builder administration and 
client relations. 
Mahanoy Business Park, NorthPoint Development – Mahanoy & Ryan Townships, 
Schuylkill County, PA
Project Manager: This project involves constructing three industrial spec buildings totaling 
2.5 million square feet for warehousing and distribution on a parcel of land spanning 540 
acres. Benesch completed site design, permitting and building layout including stormwater 
management, erosion and pollution control, PADEP Joint Permit, environmental clearance, 
wetland mitigation design, and utility coordination. This project also includes the design and 
permitting of a packaged sewer treatment plant, waterline crossing/extension under Interstate 
81, which Mike completed the planning, design, and permitting for the wastewater treatment 
plant utilizing the Modified Bardenpho Process and the design and permitting for the discharge 
point located along the headwaters of the high quality Codorus Creek within the Mountain 
Valley Golf Course.  Mike coordinated the design between the developer and the Schuylkill 
County Municipal Authority who will own and operate the plant.  
Water Treatment Plant Upgrades – City of Salem, OH
Project Manager: The City of Salem’s Water Treatment Plant is a surface water filtration
plant with a 4.4 MGD permitted capacity. The system has been taxed with organic loading
resulting in disinfection by-products (DBPs) in the finished water that have exceeded
regulatory compliance levels. In addition to addressing the organics loading at the treatment 
plant, Benesch was tasked with identifying other upgrades required to improve operations and 
maintain compliance over the next 20 years, including the distribution system. To identify the 
necessary upgrades and evaluate the most cost-effective alternatives, Benesch completed a 
Project Scoping Study. Benesch utilized the Value Planning process for the study, which is a 
systematic and logical progression of evaluating alternatives following the SAVE International 
Value Engineering model. Utility coordination included Youngstown and Southern Railroad 
(Y&S) for numerous crossings.
Michael Peleschak, PE
Role: Water Distribution Systems Task Leader
Classification: Chief Engineer
Education
BS, Civil Engineering – 
Pennsylvania State University
Years of Experience: 26
Registrations and Certifications
Professional Engineer: PA 
(#073238); OH (#77011); MT 
(#49143); OK (#34579); TX 
(#158398); CO (#0066609)
SAVE International Value 
Engineering Workshop – Module 
I 
Professional Affiliations
National Society of Professional 
Engineers
American Society of Civil 
Engineers
PA Water Environment 
Association

Page 34

30
Town of Granby // On-Call Engineering Services
SECTION 3: KEY PERSONNEL
Education
B. Architecture, Pratt Institute
A.S. Architectural Engineering, 
Norwalk State Technical College
Summer Program, Rhode Island 
School of Design
Design Certificate, University of 
Copenhagen
Years of Experience: 20
Registrations and Certifications
Registered Architect: CT, VT, NY, 
RI, ME, MA
 
Registered Interior Designer: CT
Professional Affiliations
Design Juror, Architectural 
Program, Norwalk
Community College
American Institute of Architects
Connecticut Society of Architects
Board of Directors, AIA 
Connecticut
Architectural Department 
Advisory Board
member, Norwalk Community 
College
David Stein, AIA
Role: Architecture Task Leader
Classification: Chief Engineer
David Stein transitioned his 20+ years of design and project management for the firm to 
leading the firm’s business development efforts. He has extensive experience working with 
and managing large-scale projects with multidisciplinary teams. He has an excellent record as 
a team builder and effectively manages client and community relations for design projects. His 
design and project management background includes educational, municipal and financial
projects. David manages the firm’s decades-long relationships with some of the region’s most 
prominent financial institutions and law firms.
Relevant Project Experience:
• Senior Center Renovations - Woodbridge
• 1928 High School Building Reuse - Farmington
• Pierson Park and Locker Rooms Study - Cromwell
• Bigelow Senior Center Study & Renovations - Fairfield
• New Community/Rec Center – New London
• Cultural Community Center Renovations - Woodbridge
• Shennecosset Golf Course Maintenance & Restroom Renovations - Groton
• Old Train Station Adaptive Reuse - Wallingford
• New Senior Center – Colchester
• Athletic Brewing Company Renovations – Stratford
• Electric Railway Museum Renovations - Branford
• Blackstone Memorial Library Renovations and Expansion – Branford
• H. Smith Richardson Golf Course New Clubhouse – Fairfield
• Community Pool Conceptual Design - Wallingford
• Belden Library Renovation and Expansion – Cromwell
• Animal Shelter Renovation and Expansion – Woodbridge
• Town Hall Office Conversion of Former Middle School - East Haddam
• East Side Youth Center Historic Rehabilitative Reuse - Manchester 

Page 35

31
SECTION 3: KEY PERSONNEL
Town of Granby // On-Call Engineering Services
Robert Banning, PE
Role: M/E/P Task Leader
Classification: Chief Engineer
Bob Banning leads SP+A’s electrical and mechanical engineering practice. He reviews 
construction shop drawings for compliance with the current codes and standards and 
handles all phases of projects, including client contact, programming, design development, 
construction document production, consultant coordination, and construction administration.  
As chief electrical engineer, he manages the electrical engineering team in the preparation 
of specifications and plans for electrical power systems, utility and emergency back-up 
power distribution, interior and exterior lighting, fire alarms, security, access control, and 
instrumentation and control systems, including inspection and evaluation of existing electrical 
systems. 
Representative Experience
• Old Greenwich ES Renovate as New - Greenwich
• Community/Rec Center Expansion - Norwalk
• Region 18 HVAC Upgrades - Lyme/Old Lyme
• 1928 Building Renovations - Farmington
• New Community/Rec Center – New London
• High Watch Recovery Center Expansion and Renovation – Kent
• Hinsdale Elementary School Renovate as New – Winsted
• Emergency Generator Design for WPCA – Fairfield
• CT Juvenile Detention Center Interior Renovations – Hamden
• Mansfield Middle School Roof PV Design – Mansfield
• City Hill Middle School Roof PV Design - Naugatuck
• H. Smith Richardson Golf Course New Clubhouse – Fairfield
• Region 13 Schools HS and Strong School Pumphouse – Durham
• Melissa Jones School Door, Window and Elevator Replacement – Guilford
• Enfield High School Renovate as New - Enfield
• Memorial School Generator Replacement – Middlefield
• Courthouse Elevator Modernization – New Britain
• Electric Railway Museum Renovations - Branford
• Fort Trumbull Pier Stabilization and Renovation – New London
• City-wide Fire Stations Capital Needs Assessments – New Britain
• Police Department Relocation and Renovations – East Lyme
• City of Hartford On-Call A/E Services
• ACES @ Leeder Hill Renovate as New – Hamden
• Berlin High School Renovate as New Additions – Berlin
• Bergin Housing Complex Intercom Renovations – Waterbury
• Police Communication Tower – East Haddam
• Field Memorial School Fire Alarm Panel Replacement – Bozrah
• New Fire Station #5 & Maintenance Facility – East Hartford
• High School Athletic Fields Lighting Engineering Services – Enfield
• Multiple School Security Improvements – Waterbury
• Northeast School Generator Replacement – Stamford
• Police Department Generator Replacement – Bristol
• Polson Middle School Photovoltaic Roof System – Madison
• M/E/P/FP for New Multi-Level Garage @ St. Francis Hospital – Hartford
• University of Connecticut – On-Call MEP/Life Safety & Fire Protection
• Wormser Congregate Elderly Housing Emergency Generator & Fireline
• Backflow Prevention System – Stamford
Education
BS, Electrical Engineering - 
University of Connecticut
AS, Nuclear Technology - 
Thames Valley Technical College
With SP+A Since 1993
Registrations and Certifications
Professional Engineer: CT, MA

Page 36

Please note: This document is designed for double-sided printing. 
Intentional blank pages are included for proper alignment.

Page 37

Section 4:
Relevant Experience

Page 38

Please note: This document is designed for double-sided printing. 
Intentional blank pages are included for proper alignment.

Page 39

35
SECTION 4: RELEVANT EXPERIENCE
Town of Granby // On-Call Engineering Services
Rockwell Park  Revitalization Project
Town of Bloomfield, CT
Background: Located in Bloomfield, Connecticut, Rockwell Park is one of the 
primary amenities of the town. The Bloomfield Rockwell Park Revitalization Project 
will transform this historic community park into a vibrant, inclusive, and sustainable 
public space. 
Scope: Benesch was selected to lead the development and execution of a 
comprehensive master plan, which includes integrating a new segment of the East 
Coast Greenway through the park to enhance regional connectivity and promote 
active transportation. Upgrades will also include a multi-purpose synthetic turf field, 
community garden, gazebo, and associated amenity spaces. 
Benesch prepared an A2/T2 survey of the entire 14-acre property, including adjacent 
ROWS, to allow for the detailed design and permitting of the project.
The design emphasizes improved accessibility, enhanced recreational amenities, 
and ecological restoration to support native plantings and storm water 
management. Key features include upgraded walking trails, new gathering areas, 
modern play zones, and integrated lighting for safety and usability. 
Construction is scheduled to begin in 2026, marking a major step toward creating a 
welcoming environment that celebrates the park’s cultural significance and fosters 
community engagement for all ages.
Key Issues
• Survey
• Site/Civil Engineering
• Landscape Architecture
• Ecological Restoration
• Walking Trails
• Improved Accessibility
• Modern Play Zones 
Dates of Service
06/2025 - Ongoing
Project Cost
Approx. $4M
Client Reference
David Melesko 
Director of Parks, Recreation & 
Leisure Services
330 Park Avenue
Bloomfield, CT 06002-0337
P: (860) 769-3534
E: dmelesko@bloomfieldct.gov

Page 40

36
Town of Granby // On-Call Engineering Services
SECTION 4: RELEVANT EXPERIENCE
Background: Located just outside of Hartford, Connecticut, the Bloomfield Tennis 
Club (BTC) offers a variety of programs and services for tennis players of every 
level. When the time came to expand its facilities, BTC turned to Benesch to provide 
integrated design services.
Scope: Benesch is providing survey, site/civil engineering, landscape architecture 
and land-use permitting services associated with the construction of six (6) outdoor 
tennis courts, eight (8) pickle ball courts, an outdoor pool, pavilion, and associated 
amenities. The potential for future expansion of the tennis and pickle ball courts are 
being incorporated into the designs.
Benesch conducted a boundary, topographic and general location survey of the 
property. We later merged this information with an existing survey (performed by 
others) for an adjacent parcel to form one usable boundary and topographic survey, 
suitable for design, permitting and construction of the project. 
Site Plan Approval/Special Permitting was required due to the project’s location in 
an Industrial (IND-2) Zone. Benesch’s land-use permitting effort involved review 
and analysis of local zoning regulations, preparation of a Stormwater Management 
Report—including hydrologic and hydraulic analyses—a Stormwater Control Plan, 
and application preparation. A Wetlands Permit was also required. 
Post-permitting, Benesch worked with BTC to help them obtain a grant from the 
United States Tennis Association to construct new tennis courts. We are also 
actively assisting them with potentially incorporating an outdoor swimming pool 
into the project.
Tennis Court Design – Bloomfield, CT
Bloomfield Tennis Club
Key Issues
• Survey
• Site/Civil Engineering
• Landscape Architecture
• Land-Use Permitting
• Hydrologic & Hydraulic 
Analyses
• Coordination with Local 
Departments
Dates of Service
02/20-Ongoing
Project Cost
$45,000 (design fee)
Client Reference
Rostyk Datsko
General Manager
Bloomfield Tennis Club
45 Douglas Street
Bloomfield, CT
P: 860-878-7391
E: rostyk.datsko@gmail.com
New pickle ball courts.
View of tennis and pickle ball courts 
from parking area.
New tennis and pickle ball courts.

Page 41

37
SECTION 4: RELEVANT EXPERIENCE
Town of Granby // On-Call Engineering Services
Background: Being the only Division II school in CT, the athletics program at 
Southern Connecticut State University (SCSU) has seen major growth in recent years. 
The 10-year-old AstroTurf field and 20-year-old track were in need of being replaced. 
Scope: This project includes renovation of the existing field, track, and all of its 
field events. The upgrades to Jess Dow Field will not only enhance the surface 
performance, but also improve the aesthetic and branding of SCSU’s primary 
athletic arena.
Benesch performed a boundary and topographic survey for the entire stadium. 
Underground utility location, utility research and field location of all site amendments 
were also provided.
We also performed an evaluation of all hardscape, softscape, stormwater, and 
utilities on site and prepared a written report documenting the existing conditions 
of all applicable site items. Benesch is currently providing civil-related design and 
permitting services, including erosion control, stormwater and utility design.
Jess Dow Field Renovations
Southern Connecticut State University
Key Issues
• Existing conditions analysis
• Track and field design
• Site planning & analysis
• Stormwater management
• Utility design
• Traffic
• Survey
Dates of Service
2022 – 2023
Project Cost
$1,460,000
Client Reference
Rahul Abraham
CT Department of Administrative 
Services
450 Columbus Blvd., Suite 1201
Hartford, CT 06103
P: 860-713-5741
E: rahul.abraham@ct.gov
Rendering – Centerfield
Rendering – Grandstands
Completed field

Page 42

38
Town of Granby // On-Call Engineering Services
SECTION 4: RELEVANT EXPERIENCE
Background: Benesch worked hand-in-hand with Sports Fields, Inc. to deliver this 
project as a design-build. Springfield College required an upgrade of the existing 
natural grass softball field to synthetic turf. The field as well as dugouts and other 
amenities were dilapidated and at the end of life.
Scope: Benesch provided engineering design, land-use permitting, and construction 
phase services associated with the installation of a synthetic turf softball field. 
Civil services include detailed layout, grading and subsurface drainage design for 
the field and associated improvements. Benesch also provided environmental and 
geotechnical services.
This project involved survey and civil design for the renovation of the college 
softball field from natural grass to synthetic turf. The civil design included erosion 
control, turf drainage, walkway drainage, handicap accessibility and utilities. 
Benesch worked closely with the City Engineering Department and DPW to ensure 
the project met local permitting and design requirements.
Springfield College Softball Field
Springfield, MA
Key Issues
• Stormwater
• Permitting
• Construction services
Dates of Service
2020 – 2021
Project Cost
$1,300,000
Client Reference
Jennifer Vigneault
Associate Director of Planning  
and Facilities
Springfield College
263 Alden St
Springfield, MA 01109
P: 413-748-3298
E:  jvigneault@springfieldcollege.
edu

Page 43

39
SECTION 4: RELEVANT EXPERIENCE
Town of Granby // On-Call Engineering Services
Background: The Miracle League of Northern Connecticut provides opportunities 
for children with physical and cognitive challenges to participate in recreational 
activities in an accessible, nurturing, and non-competitive environment where 
families can come together to cultivate new friendships and experience the joy of 
play. They worked closely with the Town of Vernon to identify a town location to 
place a new synthetic turf field that would be sized and built to meet the needs of 
the children.
Scope: The design included a new synthetic turf baseball/softball field and 
associated amenities (fencing, concrete walks, drainage, utilities, etc.)  Additionally, 
an expansion to the existing school parking lot, including an ADA-accessible 
turnaround/drop area and ADA-compliant parking spaces, was designed. Due 
to space limitations, stormwater management was provided via underground 
detention, which was designed to function with the existing sandy soils.
Benesch performed full design services for the project including civil engineering 
and landscape architecture design. As part of the project, we worked closely 
with the Town to obtain all required land-use permits and provided construction 
oversight during construction. 
Unique Features: The town worked with the Miracle League and performed the 
parking lot expansion at their own cost. Benesch contracted with the Miracle 
League for the field design and separately with the Town for the parking lot 
expansion design. Benesch provided coordination between both entities, including 
their contractors, to ensure seamless construction coordination.
Vernon Miracle Field 
Miracle League of Northern Connecticut
Key Issues
• Parking
• ADA Compliance
• Drainage
Dates of Service
11/2022 – 9/2023 
Project Cost
$1,500,000
Key Personnel Involved
Project Manager: Will Walter
Client Reference
Steven Leibowitz
Executive Director
Miracle League of Northern CT
76 Frontage Road
Vernon, CT 06066
P: 860-916-6521
E: steven_leibowitz@pue-cpas.com

Page 44

40
Town of Granby // On-Call Engineering Services
SECTION 4: RELEVANT EXPERIENCE
Marvin Caldwell Park 
City of Concord
Background: Caldwell Park is an existing ± 18-acre park located in a transitioning 
neighborhood in the southeast part of the city. Built in the 1980s and updated in 
2001, the City has considered re-master planning the park to address the changing 
recreation trends, changing demographics and the creation of a more inviting 
appearance and gateway for the neighborhood. The park will also serve as a trailhead 
for the first segment of the Irish Buffalo Creek Greenway for the city. The City’s intent is 
to develop a new vision for the park and establish a budget for park renovations with 
the understanding that park construction will be phased in over the next five years.
Scope: Benesch services to date have included inventory and assessment, concept 
and master plan development, budget estimates, graphic visualization, public 
involvement, surveying, schematic design, detailed design, permitting and services 
during construction. 
Unique Features: The redevelopment of Caldwell Park will provide new “walk-to” 
amenities including a splash pad, inclusive playgrounds and multi-sport courts for many 
residents that live within a half-mile radius of the park. The existing site constraints and 
being located within the floodplain lend the park programming to focus on low-impact 
recreational activities. In order to make the park as inclusive as possible, the playground 
is being designed with poured-in-place surfacing with a seamless transition to perimeter 
walkways.
Public Outreach Approach: Benesch conducted one community drop-in workshop 
for the purpose of gathering input on recreation needs and proposed facilities. 
In addition, Benesch presented at two Logan Neighborhood meetings and to the 
Concord City Council for the adoption of the master plan. 
Key Issues
• Existence of floodway, floodplain 
and river/stream buffer within 
park put constraints on re-
development of some facilities 
and placement of new facilities, 
including the greenway
• Redevelopment of an LWCF 
park required careful planning to 
ensure that facilities constructed 
with LWCF funds remain in park 
programming
• Introduction of a greenway into 
the park design leads to other 
connectivity needs along the 
park periphery
Dates of Service
03/2019 - Ongoing
Project Cost (Estimated)
$8 million
Client Reference
Ms. Sheila Lowry 
City of Concord Parks & 
Recreation 
147 Academy Avenue NW 
Concord, NC 28026 
P: 704-920-5611 
E: lowrys@concordnc.gov

Page 45

41
SECTION 4: RELEVANT EXPERIENCE
Town of Granby // On-Call Engineering Services
Background: Located in Locust Valley, New York, Friends Academy is a private K-8 
school with a robust athletics program. The site has been experiencing perpetual 
drainage problems, as the soils are not conducive to infiltration; there are no 
natural low points on site to drain to; and there are no municipal drainage facilities 
in the ROW adjacent to the site. The natural-grass, multi-use field was no exception 
and often experienced soggy conditions after rain events, rendering it unplayable.
Scope:  Benesch provided site/civil engineering services in support of the design 
of the synthetic turf field. We worked closely with the project architect to design 
grading and drainage facilities to ensure off-site drainage would not flow onto the 
field. The drainage system, designed as part of the field, includes a stone reservoir 
base that captures, detains, and infiltrates stormwater during and after rain events. 
The field drainage includes a perimeter-collector system that conveys water to 
existing low spots and dry wells that act as a relief pathway during large events,  
ensuring water will not pond on the field during or after rain events.
Unique Features: As part of the project, Benesch led the design effort for the 
design of “wick” dry wells that were designed as redundancy for the drainage 
system on the synthetic turf field. The “wick” dry wells were so well received that 
Benesch was asked to prepare a campus-wide drainage master plan to address all 
of the drainage issues on site. The master plan subsequently identified six critical 
problem areas on site and recommended the use of “wick” dry wells in eight 
locations on site. Once fully implemented, the master plan, in conjunction with other 
measures, is anticipated to solve all campus-wide drainage issues.
Friends Academy Synthetic Turf Design
Friends Academy
Key Issues
• Grading Design Review
• Synthetic Turf Drainage Design
• Erosion Control
• Permitting
• Construction Phase Services
Dates of Service
03/2019 – 09/2020
Initial Budget
$1,000,000
Project Cost
$850,000
Client Reference
Ann Marie Tidona, CPA
Director of Finance, Operations 
& Strategic Projects
Friends Academy
270 Duck Pond Road
Locust Valley, NY  11560
P: 516-393-4203
E: tidona@fa.org
Celebration Plaza 
Outdoor Classroom
Completed field.

Page 46

42
Town of Granby // On-Call Engineering Services
SECTION 4: RELEVANT EXPERIENCE
Background: Benesch has provided survey, engineering, and construction 
administration services for an extensive array of athletic facilities including the following.
• Annie Fisher Montessori School Athletic Fields – Hartford, CT: New synthetic 
turf baseball, football and soccer complex with additional site features. 
• Cottone Field – Wethersfield, CT:  New artificial turf football field at Cottone 
Field and peer review of lighting foundation design and construction services. 
• Blackham School Baseball Field Renovation – Bridgeport, CT: New synthetic 
fields for three-field complex, site features, and local permitting. 
• Columbus Park – Hartford, CT: In-filled synthetic multi-purpose field—including 
youth soccer and baseball field overlays—covered dugouts, backstop, bleacher 
pads and sidewalks.  
• Hyland Park Baseball and Soccer Development Plan – Hartford, CT: New 
synthetic turf baseball and soccer fields with additional site features. 
• Luis Munoz Marin School Baseball and Football Field Renovation – Bridgeport, 
CT: New synthetic baseball and football fields with additional site features. 
• Springfield College Softball Field – Springfield, MA: Design and construction 
of this synthetic turf softball field.
• Rocky Hill Intermediate School – Rocky Hill, CT: Two Athletic Fields for 
Baseball/Softball and Soccer/Lacrosse. 
• New London High School Athletic Fields – New London, CT: Design of two 
synthetic turf fields, replacement of the existing bleachers and press box, new 
concessions, and team rooms. 
• Ray Snyder Jr. Municipal Stadium – Waterbury, CT: New synthetic turf surface 
for football, soccer, softball, and little league baseball.
Additional Athletic Field Experience
Multiple Clients
Cottone Field
Key Issues
• Artificial/synthetic turf fields for 
multiple sports
• Site layout, grading & drainage
• Construction administration
• Roadway & traffic engineering
• Building & lighting 
improvements
• Utility design 
• Boundary & topographic survey
• Grading & drainage design
• Permitting
• Planning & zoning commission 
review
Blackham School Baseball Field
Springfield College Softball Field
New London High School Athletic 
Fields

Page 47

43
SECTION 4: RELEVANT EXPERIENCE
Town of Granby // On-Call Engineering Services
Background: Benesch has provided comprehensive engineering services to 
the New Britain Department of Public Works since 2000. Services encompass 
roadway and intersection design, traffic and transportation engineering, site 
design, structural and utility engineering, parks improvements, land surveying and 
construction services.
Scope: The images provided depict a few of the many assignments Benesch has 
performed under our on-call contract with New Britain. Additional tasks include:
 • Allen Street Drainage Improvement
• A.W. Stanley Bridge Replacement
• Downtown Signage Improvements
• East Street Water Main Relocation
• Franklin Square/Elm Street Improvements
• Grand Street Extension
• Hart Street Extension
• Interstate 84 Water Main Relocation
• John Downey Drive Drainage Improvements
• McClintock Street Drainage Improvements
• New Britain City Hall Rehabilitation
• New Britain Courthouse Construction Administration
• New Britain Water Main Replacement
• New Britain Utility-Subway System Design
• New Municipal Dog Pound
• Overlook Street/Sealander Street Drainage Improvements 
• St. Claire Street/Lester Street Improvements 
• Stanley/Chestnut Street Intersection Improvements 
• Stanley Golf Course/Fairview Apartments Drainage Improvements
• Two-Bay and Four-Bay Fire Stations
New Britain On-Call Engineering Services 
City of New Britain, CT
Key Issues
• Roadway/Intersection design
• Traffic/transportation engineering
• Site design
• Structural engineering
• Utility engineering
• Parks improvements
• Land surveying
• Construction services
Dates of Service
2000 - Present 
Project Cost
Varies by Project
Client Reference
Mark E. Moriarty, PE
Director of Public Works
City of New Britain
City Hall
27 West Main Street
New Britain, CT  06051
P: (860) 826-3350 
E: mmoriarty@ch.ci.new-britain.ct.us
A.W. Stanley Bridge Replacement.
Hart Street Extension
New Britain Courthouse Construction Administration

Page 48

44
Town of Granby // On-Call Engineering Services
SECTION 4: RELEVANT EXPERIENCE
East Hartford On-Call Engineering Services
Town of East Hartford, CT
Key Services
• Site/civil structural engineering
• Condition inspection 
• Transportation engineering
• Traffic engineering 
• Land surveying 
• Geotechnical engineering
• Hydraulic engineering
• Environmental engineering
• Construction inspection
• Constructability review 
• Building & facilities 
Dates of Service
2003 - 2012 & 2015 - Present
Project Cost
Varies by project 
Client Reference
Doug Wilson, PE
Town Engineer
Town of East Hartford
740 Main Street
East Hartford, CT 06108
P: 860-291-8373
E: DWilson@easthartfordct.gov
Overview: Benesch has served as East Hartford’s on-call engineering consultant 
from 2003 to 2012 and again from 2015 to present, continuing to support town staff 
today. Over the course of this relationship, we have completed numerous individual 
assignments on time and within budget. A sampling of that work is provided below.
• Main St. CCGP Grant Application
• Main St. Levee Sidewalk
• DPW Tank Replacement
• Solar Carport Structure Evaluations 
• East Hartford Flood Protection 
System Inspection and Repairs
• Environmental Evaluation & 
Remediation - 1006 Silver Lane
• Evaluation of Meadow Lane Farm 
Environmental Report
• Flood Protection System Benefit Cost 
Analysis
• GIS Wetland Mapping Conversion
• Governor St. Reconstruction - 
Geotechnical and Traffic Engineering, 
Retaining Wall Design
• Governor St. Signalization and 
Retaining Wall Design
• Hockanum River FEMA Flood 
Insurance Rate Map Revision
• Inspection of Single-Arm Cantilever 
Sign Support
• Main St. Master Plan
• Orchard St. Drainage Improvements
• Peer Review of CVS Traffic Analysis
• Pedestrian Foot Bridge Replacement - 
Burnside Avenue to Labor Field
• Phase I Environ. Site Assessment - 
Hilltop Farms/Barbara Drive
• Phase I Environmental Site 
Assessment - Short Reach/Hillside 
Avenue
• Preparation of LOMR Request to FEMA -  
Hillside St./Burnside Avenue Parcel
• Public Safety Complex - Access 
Improvements
• Rentschler Field Shoppes
• Roberts St. Pavement Evaluation
• Scour Evaluation - Bridge No. 04496 
and Bridge No. 05826 
• Stormwater Pollution Prevention Plan 
for Transfer Station
• Town Hall HVAC upgrades
• Town Hall Pavement Evaluation
• Traffic Counts / ADT Development - 
Various Roadways

Page 49

45
SECTION 4: RELEVANT EXPERIENCE
Town of Granby // On-Call Engineering Services
On-Call Engineering Contract
City of Springfield, MA
Benesch has provided the City with on-call engineering 
services for over a decade. Our contract supplements City 
staff and includes surveying, civil engineering, roadway and 
traffic design, flood control system design, inspection and 
maintenance, as well as building and infrastructure inspection. 
A sample of projects delivered across our on-call contracts is 
provided below.
Berkshire Avenue Corridor Improvements: Benesch analyzed traffic projections and 
crash data for the corridor, conducted intersection capacity analyses for staged and final 
conditions at two coordinated signal locations, and evaluated vehicle access at abutting 
driveways integrated with the signal system. Corridor improvements included exclusive bike 
accommodations, reconstructed curb ramps, crosswalks and bike boxes at both intersections, 
and approach widening to accommodate large vehicles and bicycle traffic.
Reconstruction of Birnie Avenue at Gerena School Pedestrian Tunnel: Benesch was retained 
by the City of Springfield to perform ground survey, design roadway improvements and 
rehabilitate the roadway bridge/pedestrian tunnel underneath Birnie Avenue connecting to the 
German Gerena Community School. Due to a history of water infiltration at the bridge/tunnel 
structure, the project includes design to waterproof the structure, as well as the implementation of 
a raised speed table to address both water infiltration and high vehicular speeds along the corridor.
Central Street Corridor Improvements: Benesch provided schematic and final design, survey, 
environmental and geotechnical engineering, traffic services, right-of-way, and bidding and 
construction administration for this reconstruction and realignment project. Work included two 
signalized and eight stop-controlled intersections, realignment of Central Street at Hancock 
Street, conversion of Hickory Street to two-way traffic and Rifle Street to one-way traffic.
Springfield Flood Control System Inspection & Improvements: Benesch provided design, 
construction and inspection services to oversee improvements required by the Army Corps 
of Engineers and FEMA. We surveyed and prepared designs for the Flood Control System: 
removal of vegetation from 4,000 LF of earthen dikes, structural repairs to 13,000 LF of 
concrete floodwalls, and repairs to the Mill River conduit system. We currently provide 
quarterly inspection and maintenance services.
Design Improvements to the Allen Street/Bicentennial Highway Corridor: Benesch 
prepared planning and design documents for roadway and circulation improvements in this 
heavily congested area. Planning services included significant data gathering, stakeholder 
meetings, conceptual design and traffic analysis. Numerous alternatives were developed to 
determine a solution for addressing increasing traffic volumes, while maintaining safety for 
area residents. 
Main Street Reconstruction & Roadway Improvements: The project consisted of surveying, 
the reconstruction of 4,500 feet of roadway, replacement of sidewalks, new street lighting, 
new traffic signals, and new pedestrian crosswalks. Benesch worked very closely with 
the Springfield Business Improvement District (BID) to coordinate design and construction 
activities.
Key Issues
• Site/civil
• Structural engineering
• Condition inspection 
• Transportation engineering
• Traffic engineering
• Land surveying
• Geotechnical engineering
• Hydraulic engineering
• Environmental engineering
• Building & facilities
Dates: 2001 - Ongoing 
Project Cost: Varies by project
Client Reference
Christopher Cignoli, PE  
Director DPW
City of Springfield
70 Tapley Street
Springfield, MA 01104
P: 413-750-2808
E: Ccignoli@springfieldcityhall.com

Page 50

46
Town of Granby // On-Call Engineering Services
SECTION 4: RELEVANT EXPERIENCE
Background: Benesch has been providing the Town of West Springfield with on-
call engineering services for over a decade. Designed to supplement the Town’s 
Staff and expertise, our contract encompasses full site/civil engineering services, 
including roadway and bridge design, construction inspection, surveying, and 
coordination of associated consultants for mechanical, electrical and geotechnical 
engineering, landscape design, and aerial mapping. 
Scope: The images provided depict a few of the many assignments Benesch has 
performed under our On-Call Contract with West Springfield. Additional tasks 
include:
• Birnie Avenue Culvert Repairs
• Elm Street/Kings Highway Intersection Improvements
• Elm Street Parking & Pedestrian Improvements
• Flood Protection System ACOE Accreditation
• Flood Protection System Design Improvements
• Flood Protection System FEMA Comprehensive Inspection
• Flood Protection System Maintenance Deficiency Correction Plan (MDCP)
• Memorial Avenue/Bresnahan Street Intersection Design
• Mittineague Bridge Analysis
• Piper Road Crosswalk Study
• Piper Pond Outlet Control Studies
• Preparation of a Notice of Intent — West Springfield Flood Control System/ Dike 
Repair Plan
• Route 20/Route 5 Rotary Study
• Route 20 Vehicular Speed/Signal Study
• School Zone Traffic Signal Study
• Town Green Power Improvements
• Veteran’s Park Parking Improvements
• Westfield Street/Second Street/Chestnut Street Intersection Improvements
West Springfield On-Call Engineering Services
Town of West Springfield, MA
Key Issues
• Site/civil engineering
• Roadway design
• Bridge design
• Construction inspection
• Surveying
• Flood protection system 
inspection, design, maintenance 
& accreditation
• Traffic engineering
• Innovative traffic concepts
• Municipal traffic studies 
Dates of Service: 2001 - Present
Project Cost: Varies by Project
Client Reference
Robert Colson, Director of Public 
Works 
Town of West Springfield
26 Central Street
West Springfield, MA 01089
P: 413-263-3030
E: rcolson@west-springfield.ma.us
Elm St. Parking & Pedestrian Improvements
Elm St./Kings Highway Intersection 
Improvements
Flood Protection System Maintenance Deficiency Correction Plan (MDCP).

Page 51

47
SECTION 4: RELEVANT EXPERIENCE
Town of Granby // On-Call Engineering Services
On-Call Engineering (Street Improvements)
City of Medford, MA
Background: The City of Medford instituted major roadway improvements to six local 
streets to provide better access to an elementary school and reduce cut-through traffic 
in the project area. The City contracted with Benesch to develop a comprehensive plan 
to calm traffic and reduce accidents, while also improving roadways, parking areas, and 
sidewalks within this residential area. Funding for the project was obtained through a 
Federal Community Development Block Grant.
Scope: Benesch designed traffic safety improvements and calming features for Auburn, 
Cottage, Allston, Prescott & Hinsdale Streets and Windsor Road. Updates include raised 
intersection tables and curb bump-outs to slow traffic and improve safety for all users. 
Benesch upgraded the roadway and sidewalk network to provide complete street features 
and upgrade facilities to meet Federal ADA and State AAB regulations. Features included 
reconstruction of sidewalk curb ramps and new crosswalk patterns.
Benesch also provided topographical survey, municipal water and drainage design, utility 
relocation coordination, traffic management, and phased construction schemes. Various 
drainage system improvements and renovation of the existing water system included 
new water gates, hydrants & service connections. One of the primary challenges with the 
project location was accommodating elementary school pick-up and drop-off within the 
project limits. Phased construction was implemented to maintain traffic through the heavily 
traveled corridor adjacent to the school as well as reduce impacts to the many abutters. 
Benesch worked closely with the Office of Community Development, Engineering, 
Forestry and Water Departments to provide resident engineering services which included 
organization and promotion of public meetings (e.g. public tree hearing), development of 
construction bid documents, assisting the City with Issued for Bid (IFB) notice, review of 
bids, contractor recommendation, weekly progress meetings, frequent field meetings, and 
ensuring contractor compliance with the contract documents.
Key Issues
• Federal CDBG funding
• ADA/AAB sidewalk upgrades 
• Incorporated traffic calming 
elements
• Roadway reconstruction
• Water main and service line 
replacement 
• Construction observation
• Public meeting coordination
Dates of Service: 2018 - 2022
Project Cost: $1,700,000 
Client Reference
Ahmet Caus, Assistant City 
Engineer
City of Medford
85 George P. Hassett Drive, 
Room 300
Medford, MA 02155
P: 781-475-5975
E: acaus@medford-ma.gov

Page 52

48
Town of Granby // On-Call Engineering Services
SECTION 4: RELEVANT EXPERIENCE
Hartford On-Call 
Services 2018-2024 
City of Hartford, CT
Contract Value
$5,000,000 
Client Reference
William Diaz
Project Leader
P: 860-757-9604
E: diazw003@hartford.gov
SPA provided on-call services to the City of Hartford. Being 
on-call to the City of Hartford means the firm provides 
assistance to various City departments with the following:
• Program Review
• Field Investigation
• Program Development
• Code Analysis
• Preliminary Design / Schematic Design / Design 
Development / Construction Documents
• Regulatory Review, Meetings, and Approvals
• Cost Estimates for any/all phases of design
• Contract Documents
• Construction Administration
Projects completed under this contract include:
• Sports and Medical Academy Roof Replacement
• Firehouse #5 – Capital Needs Assessment
• Firehouse #5 - Design through Construction 
administration Sisson Avenue Firehouse #11 – 
Renovations including new kitchen, generator, lighting, 
roof replacement and paving improvements
• 24 Ely Street Church As-Builts
SPA provided on-call services to the City of Waterbury. On-
call A/E services were provided to Connecticut’s fifth largest 
city to assist them in maintaining their public buildings and 
structures. The firm was selected for its in-house, integrated 
design services.
Some of the projects completed under this contract were:
• Addition of air conditioning at the North End & River 
Recreation Center gymnasiums
• Window replacement, a new generator, and HVAC 
upgrades at the Waterbury Police Activities League (PAL)
• Toilet improvements and ADA compliance at Western Hills 
Golf Club
• HVAC replacement at Chase Parkhouse
• Variable Frequency Drive (VFD) design and pump 
upgrades at Thomaston WWTP
• Outdoor pool evaluation
Client References
Paul Bellagamba, PE
City Engineer
P: 203-574-6851
E: pbellagamba@waterburyct.org 
Mark Lombardo
Deputy Director Public Works
P: 203-574-6851 
E: mlombardo@waterburyct.org
Waterbury On-Call 
Services 2017 - 2027 
City of Waterbury, CT

Page 53

49
SECTION 4: RELEVANT EXPERIENCE
Town of Granby // On-Call Engineering Services
REFERENCE #1
Municipality:  
Southern Connecticut State University
615 Fitch Street
Hamden, CT 06514
Dates of Service: 2022 - 2023
Description of Work Performed: Renovation of the existing field, track, 
and all of its field events.
(Full project description provided on page 37)
Client Contact: 
Eric Lessne
Assoc. VP - Capital Budgeting & Facility Operations
P: 203-392-6050
REFERENCE #2
Municipality:  
Miracle League of Northern CT
76 Frontage Road
Vernon, CT 06066
Dates of Service: 2022 - 2023
Description of Work Performed: New synthetic turf baseball/softball 
field and associated amenities.
(Full project description provided on page 39)
Client Contact: 
Steven Leibowitz
Executive Director
P: 860-916-6521
E: steven_leibowitz@pue-cpas.com
REFERENCE #3
Municipality:  
Bloomfield, CT
330 Park Avenue
Bloomfield, CT 06002-0337
Dates of Service: 2025 - Ongoing
Description of Work Performed: The development and execution of a 
comprehensive master plan.
(Full project description provided on page 35)
Client Contact: 
David Melesko 
Director of Parks, Recreation & Leisure Services
P: (860) 769-3534
E: dmelesko@bloomfieldct.gov
At Benesch, we believe a project’s quality depends upon completing the job on time, within 
budget and above all, satisfying the needs and desires of the client. Our focus on client 
satisfaction is probably best demonstrated by the excellent reputation we have earned 
throughout our 80+ year business history. We invite you to contact the following references 
for a testament of our service.
REFERENCES

Page 54

Please note: This document is designed for double-sided printing. 
Intentional blank pages are included for proper alignment.

Page 55

Section 5:
Cost Proposal

Page 56

Please note: This document is designed for double-sided printing. 
Intentional blank pages are included for proper alignment.

Page 57

53
SECTION 5: COST PROPOSAL
Town of Granby // On-Call Engineering Services
Page 7 of 7
APPENDIX A
Cost Proposal
Name of Engineering Firm: ___________________________________________________
Services Needed
On-Call Engineering and Related Services
Please indicate your firm’s hourly fees over the five-year period of the contract
Billing Category Hourly Billing Rate
Project Manager ________________
Chief Engineer ________________
Engineer ________________
Technician Support ________________
Clerical/Researcher ________________
Other ________________
Other Expenses (if applicable):
Identify any other categories and costs required to provide Engineering and On-Call
services that are not included above:
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
Rates are subject to increase 4-5% per year.
Benesch
$190
$210
$150
$115
$95
We will bill direct expenses (mileage, shipping, permit-related reproduction, etc.) with zero 
mark-up.

Page 58

54
Town of Granby // On-Call Engineering Services
SECTION 5: COST PROPOSAL
SCOPE AND FEE ASSUMPTIONS AND EXCLUSIONS
• Any traffic control required will be billed separately and is not included in this proposal.
• The excavation of buried utilities and the cleaning or unclogging of pipes or sumps of any structures by Benesch’s crew are 
not included.
FEE STRUCTURE
DIRECT REIMBURSABLE EXPENSES
Classification       Billable Rate 
Travel        IRS-Approved Rate
Overnight/Special Delivery Postage    At Cost
Special Equipment Rental     At Cost
Tolls/Parking       At Cost
Laboratory Testing      At Cost
Benesch respectfully reserves the right to negotiate terms and conditions to align 
with industry standards should we be successful at winning this opportunity.

Page 59

Please note: This document is designed for double-sided printing. 
Intentional blank pages are included for proper alignment.

Page 60

Page 61

REQUEST FOR PROPOSAL
Town of Granby
Professional Engineering Services
July 24, 2026

Page 62

BL Companies
Table of Contents
Section I Letter of Interest & Contact Information
Section II   Firm Overview 
Section III   Project Team
Section IV  Project Understanding
Section V  Relevant Experience
Section VI References
Section VII Services Expected from the Town
Section VIII  Cost Proposal
Section IX Contract Exceptions

Page 63

SECTION I 
Letter of Interest & Contact 
Information

Page 64

July 24, 2026
Mr. Mike Walsh
Town Manager
Town of Granby
15 North Granby Road
Granby, CT 06035
Re: Professional Engineering Services RFP
Dear Mr. Walsh, 
BL Companies Connecticut, Inc. (“BL Companies”) is pleased to submit our qualifications to provide 
Professional Engineering Services for the Town of Granby. We have the expertise, experience, capabilities, 
and commitment necessary to successfully support the planning, design and construction of the Town’s 
athletic/running track and adjacent baseball and softball fields, as well as the on-call engineering services 
identified in the Request for Proposals.
BL Companies is a 100% employee-owned, multi-discipline consulting firm providing civil engineering, 
transportation engineering, landscape architecture, environmental, surveying, planning, architecture, 
and construction administration services throughout Connecticut and the Northeast. With more than 
360 professionals and a long history of serving municipalities, state agencies, educational institutions, 
and recreation agencies, BL Companies offers the technical depth of services, responsiveness, and local 
knowledge necessary to support the Town’s needs throughout the five-year term of this contract.
We understand that the Town is seeking engineering services for the planning, design, and construction of 
a replacement athletic running track and adjacent baseball and softball fields at the high school/middle 
school complex, as well as on-call engineering services to support projects including the construction 
of a year-round restroom facility at Salmon Brook Park, pickleball court improvements, sewer pump 
maintenance projects, and other municipal infrastructure initiatives. BL Companies has extensive 
experience providing planning, design, permitting, bidding, construction administration, and on-call 
engineering services for athletic facilities, parks and recreation improvements, municipal infrastructure, 
and capital improvement programs throughout Connecticut.
Our Connecticut operations are anchored by our centrally located Meriden headquarters, and our newly 
renovated East Hartford office, which provides convenient access to communities throughout the state, 
including the Town of Granby. The resources available through our Connecticut offices, combined with 
BL’s integrated team of licensed engineers, landscape architects, planners, environmental professionals, 
land surveyors and construction inspectors, allow us to rapidly respond to municipal needs and efficiently 
deliver projects of varying size and complexity.
355 Research Parkway, Meriden, CT 06450 T (203) 630-1406 www.blcompanies.com

Page 65

BL Companies has significant experience and expertise in municipal on-call contracts/programs including 
architectural, engineering (mechanical, plumbing, electrical, fire protection), structural (bridge & building), 
transportation engineering, civil engineering, land surveying, landscape architecture, and planning 
consulting services. We are currently providing multi-disciplined on-call services to a range of Connecticut 
municipalities and state agencies including:
The benefits BL Companies brings to the Town of Granby include:
• Extensive experience with municipal engineering, site design, drainage analysis, permitting, and 
construction administration.
• Significant expertise in the planning, design, and construction of athletic facilities, recreational 
complexes, parks, and public-use spaces.
• Relevant experience supporting park and recreation improvements, including projects similar to the 
proposed Salmon Brook Park improvements.
• A fully integrated, multidisciplinary team capable of providing all required engineering and related 
services in-house.
• Proven success delivering on-call engineering services for municipalities throughout Connecticut.
• Familiarity with Connecticut regulatory requirements, permitting agencies, and municipal processes.
• Strong local presence through our Meriden and East Hartford offices and the ability to rapidly 
mobilize staff and resources.
• Dedicated project management and proactive communication to keep projects on schedule and 
within budget.
• Town of Bloomfield
• City of Danbury
• Town of East Hartford 
• Town of Glastonbury
• City of Hartford 
• City of Meriden
• Borough of Naugatuck
• City of New Britain
• Town of Plymouth
• City of Shelton
• Town of Stratford
• Town of Windsor 
• CRCOG 
• METROCOG 
• NVCOG 
• SCRCOG
• CT Judicial Branch
• CT General Assembly
• Department of Administration Services 
(DAS) 
• Connecticut Department of Transportation 
(CTDOT) 
• University of Connecticut (UCONN) 
355 Research Parkway, Meriden, CT 06450 T (203) 630-1406 www.blcompanies.com

Page 66

Joshua Wheeler, RLA, will serve as the Project Manager and primary point of contact for this contract. 
Mr. Wheeler brings extensive experience managing municipal infrastructure, site development, and public 
recreation projects throughout the region. As a licensed Landscape Architect with significant experience 
coordinating multidisciplinary teams, Mr. Wheeler will provide day-to-day oversight of task assignments, 
client coordination, schedule management, and quality control. Supported by BL’s engineering, landscape 
architecture, environmental, surveying, and construction services professionals, he will ensure the 
Town receives responsive, high-quality service for both the athletic facilities project and future on-call 
assignments.
BL Companies has reviewed the requirements of the RFP and understands the Town’s objectives. We are 
confident that our experience, local presence, technical capabilities, and commitment to client service 
position us to be a valuable long-term partner for the Town of Granby.
Thank you for your consideration of our proposal. We appreciate the opportunity to submit our 
qualifications and look forward to discussing how BL Companies can assist the Town in successfully 
advancing the athletic facilities improvements, Salmon Brook Park initiatives, and future municipal 
engineering projects.
Sincerely,
BL Companies
Michael G. Fisher, PE
Regional Manager & Principal
355 Research Parkway, Meriden, CT 06450 T (203) 630-1406 www.blcompanies.com

Page 67

BL Companies
Contact Information
Mr. Michael Fisher, PE is the Director-in-Charge of this Town of Granby Request for Proposal 
and can be contacted at the following:
Mr. Michael Fisher, PE
Director-in-Charge
BL Companies 
355 Research Parkway
Meriden, CT 06450
mfisher@blcompanies.com
860.760.1918 (Direct Line)

Page 68

SECTION II 
Firm Overview

Page 69

About BL Companies
Your Partner for Integrated Services & Creative Solutions. 
Founded in 1986, BL Companies delivers an integrated blend of 
architecture, engineering, environmental, and land surveying services 
on projects throughout the United States. Our multidisciplinary 
teams collaborate daily to plan, design, and develop the spaces and 
infrastructure that shape everyday life. From small assignments to 
large, complex programs, we approach each project with the agility 
and insight needed to provide creative, high‑quality solutions grounded 
in technical expertise. 
BL Companies is a leading multidiscipline firm, regularly ranked as a Top 
500 Design Firm by Engineering News Record. With over 150 licensed 
professionals, BL Companies brings the resources and capabilities of 
a large firm while our employee‑ownership culture and commitment 
to client care ensures we provide the personal, attentive service of 
a small firm. Driven by a culture of excellence and responsiveness, we 
remain firmly committed to total client satisfaction and consistently 
deliver exceptional results.
As a 100% employee‑owned company, we believe in the power of 
teamwork and long‑lasting partnerships. Our dedicated employees 
are the backbone of our firm and our professional community. Being 
employee‑owned and team‑oriented means we celebrate each other’s 
successes as a united force because there are no boundaries to what 
we can achieve when working together. Our tagline, “Employee Owned. 
Client Driven.”, isn’t just a phrase to us; it informs our collaborative 
process and encourages us to deliver solutions that go beyond 
individual efforts, ensuring a result that surpasses client expectations.
SERVICES
Architecture
Civil Engineering
Environmental Services
Land Surveying & 
Geospatial Services
Construction 
Administration
Energy Services
Landscape Architecture
MEP Engineering
Planning
Structural Engineering
Subsurface Utility 
Engineering 
Transportation 
Engineering
PEOPLE
ESTABLISHED
OUR MISSION
Our mission is to provide creative solutions that enhance the built 
and natural environment through the leadership and dedication of our 
employee owners working in partnership with our clients.
EMPLOYEE-OWNED
ENR TOP 500 FIRMS
OFFICES
18
365+
1986
100%
231
13
STATES
BL Companies

Page 70

BL Companies
Office Locations
CONNECTICUT
Meriden (Corporate HQ)
355 Research Parkway
Meriden, CT 06450-7100
Hartford
Opening new office in East Hartford, 
CT soon!

Page 71

BL Companies
WE SPECIALIZE IN:
• Park design
• Park Master Planning
• Trail design
• Splash pads/Spray Parks
• Playgrounds
• Dog Parks
• Sport Courts (Tennis, Pickleball, Basketball)
• Playgrounds
PARKS, SPORTS & RECREATION
Designing Active 
Environments
BL Companies’ Sports & Recreation Team has a concentrated focus on outdoor recreation and athletics 
design within the disciplines of Architecture, Landscape Architecture and Civil Engineering. 
BL Companies leverages extensive in-house expertise and strategic partnerships to deliver tailored sport and 
outdoor recreation solutions. With more than 100 parks and athletic facilities completed and over 50 years of 
combined experience, our multidisciplinary team of landscape architects, architects, and engineers provides 
comprehensive services—from planning and design to construction oversight.
We design facilities ranging from single-sport fields to multi-sport complexes, all meeting industry standards, ADA 
requirements, and grant eligibility criteria, with a focus on both end users and long-term maintenance needs.
• Track and field complexes, courts, and competitive facilities
• Municipal-wide and individual facility master planning
• Athletic facilities needs assessments
• Stadium, bleacher, and restroom facility design
• Sports lighting systems
• Athletic fields
• Natural grass and synthetic turf
• Irrigation design coordination
• Golf design and renovation

Page 72

BL Companies
KEY SERVICES
Site Analysis & Master 
Planning
Sustainable Design 
Strategies
Vegetative Roof Design
Permitting
Irrigation Design
Construction 
Documentation
LANDSCAPE ARCHITECTURE
Enhancing Outdoor Spaces
At BL Companies, we recognize the transformative art of shaping land 
through planning, design and preservation.
• Public Spaces & Courtyards
• Educational Facilities
• Corporate Development
• Residential Communities
• Parks & Open Space Planning
• Athletic Field Design
SPECIALTIES
Our skilled Landscape Architects help lay the foundation, 
skillfully identifying opportunities in all different sorts of outdoor 
spaces, and crafting designs that achieve the desired image and 
experience.

Page 73

BL Companies
KEY SPECIALTIES
Project Management
Facility Master Planning
Feasibility & Assessment 
Studies
Site Design
Drainage & Hydrology 
Design
Utility Systems 
Coordination & Design
Public Land Use 
Permitting
Sanitary & Septic Design
Subdivision 
Infrastructure Design
Roadway Design
3D Visualizations
Geographic Information 
Systems (GIS)
CIVIL ENGINEERING
Innovative Infrastructure
The civil engineering team at BL Companies has a wealth of 
experience that it brings to each and every project.
After carefully evaluating a client’s needs, timeline, budgetary 
concerns, and desired outcomes, the team employs creative 
and innovative ideas to produce cost-effective solutions. Our 
approach to project delivery means that our skilled engineers work 
collaboratively between different disciplines to develop thorough, 
high-quality designs. Throughout the process, from design to 
construction completion, they remain involved, committed to 
ensuring the client’s objectives are met.

Page 74

BL Companies
KEY SERVICES
Culverts & Retaining 
Walls
Traffic Signal Analyses & 
Design
Hydrologic & Hydraulic 
Analyses & Design
Site Access
Traffic Impact Feasibility 
Studies
State & Local Permitting
Environmental Permitting
Parking & Traffic 
Circulation
Subsurface Utility 
Engineering
3D Visualizations
Geographic Information 
Systems (GIS)
TRANSPORTATION & INFRASTRUCTURE ENGINEERING
Elevate Your Transportation 
Projects
Navigating the complex world of transportation engineering 
demands expertise, seamless coordination and effective 
solutions. 
At BL Companies, our Transportation Engineering Group stands 
out with extensive experience and a proven track record of 
collaboration with all project stakeholders. While navigating the 
permitting process can be demanding, our experience gives us a 
unique insight into providing solutions to challenges such as safety 
issues, capacity requirements and last-minute design changes. 
From bidding to design, studies, permitting, construction and 
closeout, we ensure that our client’s requirements are met and the 
best possible results are attained.
• Highway & Roadway Design
• Structural Design of Bridges
• Transportation Planning
• Streetscape Enhancement
• Context-Sensitive Solutions
SPECIALTIES

Page 75

BL Companies
KEY SPECIALTIES
New Construction & 
Additions
Rehabilitation & 
Renovation
Historic Preservation
Adaptive Reuse
Prototype Design and 
Development
Interior Architecture
Sustainable Design
3D Visualizations
ARCHITECTURE
Blending Creativity with 
Technical Expertise
By establishing a clear understanding of our client’s objectives, 
BL Companies delivers thoughtful architectural designs by 
addressing all of the elements surrounding a project.
We talk objectives, vision, schedule, and budget in order to 
develop designs that serve our client’s needs and enhance their 
environment. Our talented staff of architects has the benefit of 
coordinating with our in-house engineering, planning, and landscape 
architecture staff for seamless client service. 
Through rigorous cross-discipline collaboration, we deliver designs 
that balance aesthetics, function, cost and quality. We are also a 
member of the US Green Building Council, and we are proud of our 
commitment to sustainable design. 
Our staff includes multiple LEED Accredited Professionals who have 
produced numerous LEED-certified designs.

Page 76

BL Companies
KEY SERVICES
Inspections & 
Investigations
Construction 
Administration & 
Support
3D Visualizations
STRUCTURAL ENGINEERING
Structurally-Sound Designs
When it comes to structural engineering, our best work is never 
seen. This philosophy of invisible excellence seamlessly blends 
technical, fiscal, and environmental concerns, resulting in 
structurally sound designs that our clients love.
Emphasizing practicality and constructibility, our solutions are as 
attractive as they are economical. From retail centers to mixed-use 
constructions, storage facilities to schools, parking structures to 
building renovations, and warehouse-industrial projects, we have a 
proven track record of success. Whatever the task, we assemble 
a specialized team to cater to specific requirements and foster 
collaboration with the design team for outstanding outcomes.
• New Construction & Additions
• Rehabilitation & Renovation
Foundation for Pre-Engineered 
Metal Buildings
• Retaining Walls & Excavation 
Support Systems
• Supports for 
Telecommunication Equipment
• Supports for Gas & Electrical 
Transmission Industry
• Bridge Design
SPECIALTIES

Page 77

BL Companies
KEY SERVICES
Building System 
Maintenance
Repair & Replacement
Code Compliance 
Studies
Lifecycle Cost Analyses
Lighting Systems
Integrated Control 
Systems
Plumbing Systems
MEP ENGINEERING
Elevating Comfort and 
Efficiency
BL Companies knows how important a facility’s mechanical, 
electrical, plumbing and fire protection (MEP/FP) systems are 
to the comfort of its occupants and the effectiveness of its 
operations, which is why it’s critical to have systems that are 
designed with the client’s goals in mind. Our experienced MEP/FP 
team crafts energy-efficient, cost-effective, and environmentally 
sound systems, backed by our commitment to sustainable design 
and our members of the US Green Building Council with a deep 
bench of LEED Accredited Professionals on board. We offer 
comprehensive MEP/FP services for all phases of design through 
construction.
• New Construction & Additions
• Rehabilitation & Renovation
• Energy Conservation &
Sustainability Studies
• Air Quality Analyses &
Remediation
• Telecommunications &
Computer Data Systems
• Backup Power & Redundancy
Systems
• Central Heating & Cooling
System Design
• Heat & Energy Recovery
• Fire Protection & Extinguishing
Systems
SPECIALTIES

Page 78

BL Companies
KEY SERVICES
Environmental 
Assessments and 
Permitting
Ecological and Habitat 
Services
Construction and 
Compliance Support
Geospatial and 
Reporting Capabilities
NATURAL RESOURCES
Science with Stewardship
• Wetland 
Identification and 
Delineation (State 
and Federal)
• Jurisdictional 
Determinations
• Local, State, and 
Federal Permitting
• Ecological and 
Habitat Evaluations
• Soil Evaluations 
and Infiltration 
Testing
• Floodplain 
Assessment and 
Permitting
• Stream 
Assessment, 
Stabilization, and 
Restoration
• Tree Conservation 
and Forestry 
Management Plans
• Stormwater 
Management
• Coastal Resource 
Identification and 
Permitting
• Environmental 
Inspection for 
Construction
• NEPA and State-
Level Environmental 
Policy Act 
Compliance
• Categorical 
Exclusions for DOT 
Work
• Expert Testimony
• Threatened and 
Endangered 
Species 
Coordination and 
Studies
• Invasive Species 
Surveys and 
Management Plans
• Vernal Pool Surveys
• Bat Habitat 
Assessments
• NOAA National 
Marine Fisheries 
Assessments
• Wetland 
Mitigation Design, 
Construction 
Oversight, and 
Monitoring
BL Companies’ Natural Resources Group provides expert environmental 
consulting and regulatory guidance to support responsible land development, 
infrastructure, and energy projects across diverse ecosystems.
SPECIALTIES

Page 79

BL Companies
KEY SERVICES
ASTM 1527-21 & CTDEEP 
Phase I Environmental 
Site Assessments
Phase II & III 
Environmental Site 
Assessments
Site Remediation & 
Closure
UST/AST Compliance
Geophysical 
Investigations
Hazardous Building 
Materials Inspections
Brownfields 
Redevelopment
Environmental 
Compliance Audits
Environmental Permitting 
& Management
SITE ASSESSMENT, REMEDIATION & CLOSURE
Environmental Insight that 
Moves Projects Forward
From brownfield redevelopment to complex permitting, our 
environmental experts help clients anticipate challenges, 
uncover opportunities, and complete projects responsibly. 
BL Companies’ Site Assessment and Remediation Group helps 
clients navigate the environmental challenges that can shape a 
project’s feasibility, schedule, or budget. From identifying regulated 
compounds in soil, groundwater, or building materials to developing 
remediation strategies, we provide practical, science-based 
solutions that move projects forward. 
 
Our team combines deep technical knowledge with decades 
of experience in brownfield redevelopment, permitting, and 
environmental compliance. Whether it’s managing environmental 
risk during property transactions or securing complex regulatory 
approvals, BL Companies offers a single, integrated source for 
creative, cost-effective, and responsible environmental services.

Page 80

BL Companies
LAND SURVEYING & GEOSPATIAL SERVICES
Precision and 
Professionalism
KEY SERVICES
GPS Services
Property & Topographic 
Surveys
Land Title Surveys
Utility Surveys
Photogrammetric 
Control
UAV Mapping
High Definition 3D Laser 
Scanning
Hydrographic Surveys
Flood Elevation 
Certificates
Railroad & Bridge 
Surveys
Construction Layout
GIS
Subsurface Utility 
Engineering (SUE)
At BL Companies, our land surveying and geospatial services 
provide precision and detail to every project. 
We utilize the newest technology, equipment, and computer 
software to ensure that the data collected is both comprehensive 
and accurate. Whether it is from the air, ground, or below the 
surface, our land surveying capabilities provide engineers and 
architects with a complete and precise understanding of the site.
Our commitment to quality at BL Companies extends to our land 
surveying services, driving us to gather the most experienced 
and capable team of surveyors available in the industry. We are 
dedicated to professionalism as well as safety on the job site, 
making us your ideal partner for all of your land surveying needs.

Page 81

BL Companies
KEY SPECIALTIES
Full-Time Construction 
Inspection & Periodic 
Site Observation
Coordination And 
Procurement Of Material 
Testing
Construction 
Administration & 
Management
Contractor Change 
Order & Claim Review
Contractor Payment 
Requisition Review & 
Quantity Verification
Independent Survey 
Stakeout & Verification
As-Built Drawings
Construction 
Engineering Support
CONSTRUCTION ENGINEERING & INSPECTION
Maximizing Infrastructure 
Investment
We bring reliable CE&I expertise, regulatory knowledge, and a 
commitment to maximizing every project’s potential.
BL Companies provides comprehensive construction engineering 
and inspection (CE&I) services, including contract administration, 
site surveying, and related support for municipal and state clients. 
We are proficient in the CTDOT’s 5-book recordkeeping system, 
AASHTOWare, COMPASS, SharePoint, and other industry software.
Our inspection professionals exceed certification requirements 
across jurisdictions, with credentials from NETTCP, ATSSA, ACI, and 
OSHA.
BL is prequalified with the Connecticut Department of 
Transportation for CE&I of road and bridge projects and holds on-
call agreements with several Connecticut Councils of Government 
for similar municipal work.
We are experienced with a wide range of funding sources—including 
municipal/state bonds, federal programs, and LOTCIP—and help 
clients maximize their project scope within available budgets.

Page 82

BL Companies
KEY SPECIALTIES
Community Planning 
Workshops
Public Site Walks
Community Surveying
Social Media Project 
Campaign
Website Creation & 
Management
Pop-Up Informational 
Events
PUBLIC OUTREACH & ENGAGEMENT
Building Better Communities 
Through Meaningful Engagement
The future of our communities depends on planning that 
reflects the needs and aspirations of residents, stakeholders, 
and partners. 
Successful public planning projects require collaboration and 
transparency from start to finish, ensuring that immediate project 
goals align with long-term community vision. 
BL Companies specializes in P
ublic Outreach and Engagement 
services tailored to each project and community. Our team works 
closely with clients and steering committees to develop customized 
Outreach and Engagement Plans that foster awareness, provide 
education, and create meaningful opportunities for public input and 
decision-making. 
Flexible and adapt
able, our approach ensures that every plan is 
designed to meet the unique goals of the project while empowering 
communities to shape their own future. 

Page 83

SECTION III 
Project Team

Page 84

Ken Radziwon, PE
QUALITY ASSURANCE / 
QUALITY CONTROL
Michael Fisher, PE
DIRECTOR-IN-CHARGE
David Cicia, PE
Jessica Bates, PE
HYDRAULICS & DRAINAGE
Michael Dion, PE, 
PTOE, RSP1
Michael Shepley, PE, 
PTOE
TRAFFIC ENGINEERING
Robert Roles, PE
Timothy Houle, PE
CIVIL ENGINEERING
Dominick Celtruda, 
PLA, ASLA
LANDSCAPE ARCHITECTURE
Steven Fraysier, PE
Jason Ellis, PE
TRANSPORTATION 
ENGINEERING
Christen Robbins, 
AIA, LEED AP
Todd Johnson
ARCHITECTURE
Jesse Vose, PE
Dennis Burton, PE
MEP ENGINEERING
Brian Reilly, PE
Dan McDonald, PE
STRUCTURAL ENGINEERING 
(BRIDGES)
Christopher Albino, 
PE
John Malary, PE
STRUCTURAL ENGINEERING 
(BUILDINGS)
Joshua Wheeler, PLA
PROJECT MANAGER
Matthew Stark
Peter Schirmer, PE
CONSTRUCTION INSPECTION & 
ADMINISTRATION
Sagan Simko, CPSS, 
PWS
Wesley Wolf, PWS
ENVIRONMENTAL RESOURCES & 
PERMITTING
Donald Smith, PLS
James Schrager, PLS
LAND SURVEYING
Joy Kloss, LEP, CHMM
Samuel Haydock, LEP
ENVIRONMENTAL SERVICES
Christopher Critelli, 
PE
SEWER ENGINEERING
BL Companies
Organizational Chart

Page 85

BL Companies  
Michael G. Fisher
PE 
Regional Manager
Summary of Qualifications 
Mr. Fisher has 32 years of experience in planning and 
designing state and municipal transportation projects. 
As a Senior Project Manager and Lead Engineer, he has 
spearheaded major highway and roadway improvements, 
realignments, intersection upgrades, roundabouts, 
resurfacing, safety enhancements, traffic signals, bridge 
replacements, and hydrologic/hydraulic designs.
A strong advocate for complete streets principles, Mr. 
Fisher consistently strives to design infrastructure that 
accommodates all users. His projects frequently include ADA/
PROWAG-compliant sidewalks and multi-use trails, on-street 
bicycle facilities, and mass transit infrastructure. He has 
also delivered streetscape designs that enhance aesthetics, 
promote traffic calming, and serve as gateway treatments for 
communities across the Northeast.
Mr. Fisher’s work often addresses complex environmental, 
historical, and sociological considerations, requiring close 
coordination with federal, state, and local agencies. He is 
well-versed in State and FHWA Design Standards, environmental 
permitting processes, and the detailed documentation required 
for project development. 
Relevant Experience 
On-Call Architecture / Engineering Services
New Britain, CT
Served as Project Manager of this contract with the City of New 
Britain for on-call services. This contract administered under the 
City of New Britain Engineering Department provided for rapid 
response to the City for civil, transportation, architectural and 
structural engineering support services for infrastructure work 
required by the City.  Sites requiring consulting services included 
properties, structures, and/or buildings under the care and 
control of the City.
On-Call Engineering and Surveying Services
Meriden, CT
Served as Director-in-Charge of this contract with the City of 
Meriden for on-call services. Under this contract BL Companies 
HIGHLIGHTS
YEARS IN THE INDUSTRY
32
EXPERTISE
Transportation: Highway, 
Traffic, CE&I, Civil 
Infrastructure
Project Management
PROJECT ROLE
Director-in-Charge
EDUCATION
Bachelor of Science in Civil 
Engineering, University of 
Connecticut, 1994 
REGISTRATIONS
Professional Engineer: CT, MA, 
NJ, NY, NC, OH, RI
PROFESSIONAL MEMBERSHIPS
American Society of Civil 
Engineers
Institute of Transportation 
Engineers

Page 86

BL Companies  
Michael G. Fisher
PE 
provides comprehensive engineering and 
planning services and studies.  Some of the 
services required by this project include 
hydrogeological, structural, mechanical, 
geotechnical, pavement engineering, 
construction services, land surveying, 
water supply, distribution and treatment 
design, water pollution control engineering 
environmental management and planning, 
transportation engineering, plumbing, 
electrical. BL Companies worked on the 
following projects under this contract: Leslie 
Drive Sewer Bridge Replacement and the 
Channel Improvements from Bradley/Coe 
Avenue Bridges to Cooper Street Bridge.
On-Call Structural Engineering Services
Trumbull, CT
Served as Project Manager of this contract 
with the Town of Trumbull for on-call structural 
services. This contract administered under 
the Trumbull Department of Public Works 
involved providing comprehensive structural 
services including professional engineering, 
bridge design, steel design, concrete design, 
geotechnical, surveying, planning, construction 
inspection, utilities and other related 
professional services while assisting the Town 
with planning, design and construction of 
various structural related projects.
Task-Based Engineering Services, 
Connecticut Department of Transportation
Statewide, CT
Served as Project Manager of this on-call 
contract to provide task-based engineering 
services to the Connecticut Department 
of Transportation’s State Design Unit to 
aid in the preparation of design plans, 
estimates, specifications, and related data 
and studies.  BL Companies was responsible 
for survey, environmental documents and 
permit applications, soils engineering, 
hydraulic engineering, drafting, photography 
and graphics for public hearings, property 
mapping, stormwater discharge certification, 
contract processing, and typing and clerical 
functions for engineering studies and reports. 
BL Companies provided or are providing 
services under this contract for the following 
projects: Bridge Preservation Program; ARRA 
Administration, Liaison and Engineering 
Services; Stormwater General Permit Review 
Certification; Local Road Accident Reduction 
Program; Pavement Preservation Program 
Administration, Liaison and Engineering 
Services; Route 82 over Roaring Brook in 
Haddam; Reconstruction of CT Route 219 
at Johnnycake Lane in New Hartford, and 
Intersection Improvements of Routes 57 and 
136 in Westport.
Arch Street Complete Streets Improvements 
Project
New Britain, CT
Serves as the Quality Control/Quality 
Assurance Professional for design services 
and the preparation of Design Plans, Special 
Provisions and Bid Documents for the Arch 
Street Complete Streets Improvements 
Project, funded for construction through the 
LOTCIP Program. The proposed improvements 
for Arch Street utilize a “Complete Streets” 
design approach, including elements such as 
brick pavers, ornamental street lighting, street 
trees, placemaking elements, and the addition 
of mid-block pedestrian crossings and sidewalk 
widening to help encourage activities such 
as outdoor dining. These curb extensions will 
reduce vehicle speeds and crossing distances, 
allow for outdoor dining areas and provide 
space for street trees, planters, and other 
enhancements.

Page 87

BL Companies  
Joshua Wheeler
PLA
Project Manager II
Summary of Qualifications 
Mr. Wheeler brings 23 years of experience in Landscape Architecture 
and Project Management, specializing in residential developments, 
commercial and retail projects, and public redevelopment 
initiatives.
His expertise includes site analysis, layout and design, construction 
documentation, and construction administration.
As a Project Manager II at BL Companies, Josh is responsible for 
designing, preparing, and overseeing the development of comprehensive 
site plans, grading plans, planting plans, detailed design plans, erosion 
control measures, streetscape road plans, and associated profiles and 
cross-sections. Additionally, he collaborates with the Project Manager 
to foster and maintain strong client relationships, ensuring seamless 
project execution and client satisfaction.
Relevant Experience 
Camp Fogarty Running Track, Rhode Island Army National Guard
East Greenwich, RI
Served as Senior Landscape Architect for the new running track at 
Camp Fogarty for the Rhode Island Army National Guard.  BL Companies 
is preparing a complete set of biddable documents that meet all 
local, state, federal, and international codes, rules, and regulations 
for the construction of a running track on Camp Fogarty.  Physical 
fitness is a paramount requirement for the training of Soldiers. Army 
regulations require all Soldiers to meet certain height/weight standards 
and pass a physical fitness test at least annually. The ability to meet 
a time standard for a known distance run is one of the events every 
Soldier must pass. Providing venues to train for the run event is an 
organizational priority. A closed, measured distance running course was 
identified as a need in a recent area development planning charrette. 
The area development plan calls for a ~400 meter measured running 
track to be located around the Camp Fogarty Parade Field.
Portsmouth High School Tennis Courts
Portsmouth, NH
Served as Senior Landscape Architect and created construction 
documents and bid specifications for alterations and repairs to convert 
4 courts to six and add new court lighting at Portsmouth High School. 
Compiled an Evaluation Report that contained an existing conditions 
HIGHLIGHTS
YEARS IN THE INDUSTRY
23
EXPERTISE
Landscape Architecture
Project Management
PROJECT ROLE
Project Manager
EDUCATION
Bachelor of Landscape 
Architecture, Minor in Biology, 
University of Rhode Island, 
2003
REGISTRATIONS
Professional Landscape 
Architect: CT, RI 

Page 88

BL Companies  
Joshua Wheeler
PLA
investigation along with recommendations on 
specific renovations and upgrades that were 
required. Also included was a comprehensive cost 
breakdown of all recommended improvements.
Classical High School Synthetic Field
Providence, RI
Served as Staff Landscape Architect for this 
multi-purpose sports field at Classical High School.  
The field combined football, soccer, lacrosse, field 
hockey and softball on it with 5 full size tennis 
courts adjacent.  Project responsibilities included 
preliminary site design through construction 
documentation, specific attention to grading plans, 
project specifications and construction supervision.
Francis Walsh Intermediate School Athletic Field 
Improvements
Branford, CT
Served as Landscape Architect for the 
revitalization of the outdoor areas at Francis Walsh 
Intermediate School, focusing on the multi-use 
athletic fields and softball field to enhance physical 
education, athletics, recess, and environmental 
enrichment. Building on previous renovations 
completed in 2021, this project introduced universal 
accessibility, update outdated elements, and add 
new features to enrich both the school and broader 
community.
Provided athletic field design and construction 
administration services, delivering key 
improvements such as replacing the existing 
recess swing structures and adding new playscape 
elements. The project also involved removing the 
aerial ropes course and baseball field, installing 
a regulation basketball court and half court, 
re-grading the softball outfield, and creating 
accessible pathways throughout the site. Two 
natural turf fields were converted to synthetic turf 
with lighting and seating, and the existing running 
track was replaced with a three-lane walking track. 
Additional upgrades included a seasonal restroom 
area, enhancements to the wetland buffer with 
naturalized plantings, rain gardens (bioretention), 
and a pollinator garden. An outdoor classroom and 
environmental education area were also introduced. 
These comprehensive enhancements transformed 
the school’s outdoor spaces into a modern, 
accessible, and sustainable environment for both 
student activities and community use.
Eldredge Elementary School Softball Field and 
Basketball Courts Renovation
East Greenwich, RI
Served as Landscape Architect for the renovation 
of the athletic facilities at Eldredge Elementary 
School, focusing on upgrading both the softball 
and basketball fields. The project involved replacing 
the existing, outdated fields with new, high-quality 
athletic surfaces to enhance playability and safety. 
Mr. Wheeler also designed a new pergola gathering 
space adjacent to the fields, providing a shaded 
area for community use. For the softball field, he 
developed a comprehensive irrigation system to 
ensure efficient water use and maintain optimal 
field conditions. The basketball court received a 
new, durable play surface, improving its longevity 
and usability. In addition, the ADA accessibility was 
enhanced throughout the site, ensuring that all 
students and community members could enjoy the 
facilities. These upgrades transformed the school’s 
outdoor areas into modern, functional, and inclusive 
spaces for recreation and learning. 
Hope High School Basketball Renovation
Providence, RI
Served as Project Manager for the site 
analysis, design development, and construction 
documentation for the Hope High School Basketball 
Renovation in Providence, RI. Initiated the project 
with a detailed Data Accumulation Survey, including 
topographic mapping, utility identification, and 
establishment of control points, all in accordance 
with state technical standards.

Page 89

BL Companies  
Ken Radziwon
PE
Senior Project Manager
Summary of Qualifications 
Mr. Radziwon brings over 18 years of diverse experience 
in transportation and civil engineering with a focus on 
public infrastructure. His expertise spans highway and 
roadway design, roundabouts, bicycle and pedestrian 
facilities, intersection design, drainage solutions, and the 
implementation of complete streets concepts.
Ken is also skilled in streetscape improvements, permitting 
applications, construction administration, and navigating 
construction practices. He has an in-depth understanding of 
Connecticut Department of Transportation procedures and 
permitting processes, as well as programs such as LOTCIP, 
Community Connectivity, TA, STEAP, and DEEP Recreation Trails 
guidelines. His comprehensive knowledge of roadway and 
traffic signal construction further enhances his ability to deliver 
successful projects.
In addition to his engineering background, Ken expanded his 
municipal expertise as the Director of Public Works for the 
Town of Ellington. In this role, he managed daily operations, 
maintenance, budgeting, and staffing for the department. He 
also served as the town’s Water Pollution Control Authority 
Administrator, Tree Warden, Local Traffic Authority, and ex-
officio member for several boards.
Relevant Experience 
Tennis Facility, University of Connecticut
Storrs, CT
Served as Project Manager for a new athletic building along 
Avalonia Way adjacent to the existing Tennis Court facility. The 
project team designed a precast concrete modular building 
equipped with water, gas, sewer, heat, telephone and data. 
The building provides on-site locker facilities, athlete restroom, 
public restroom, coaches/officials restroom/changing room, 
flex office/meeting space and support space (i.e. janitorial, 
MEP equipment). The project also proposed on-street parallel 
parking with improved ADA pedestrian access, site landscaping 
and a rain garden.
HIGHLIGHTS
YEARS IN THE INDUSTRY
18
EXPERTISE
Transportation
Civil Engineering 
Public infrastructure
PROJECT ROLE
Quality Assurance / Quality 
Control
EDUCATION
Bachelor of Science in Civil 
Engineering, University of 
Hartford, 2008
REGISTRATIONS
Professional Engineer: CT
PROFESSIONAL MEMBERSHIPS
American Society of Civil 
Engineers 
CT ITE

Page 90

BL Companies  
Ken Radziwon
PE 
Sanitary Sewer Relocations Along U.S. Route 1
Orange, CT
Serves as Project Manager for the sewer 
relocations required for State Project 106-108 
in Orange, CT. CTDOT is widening U.S. Route 
1 in Orange, which requires new drainage 
structures. The proposed location of these 
structures created several conflicts with the 
existing sanitary sewer system. Our Team is 
working alongside the Town of Orange WPCA 
to implement their design standards for the 
relocations that are required due to proposed 
conflicts. Our Team is also working closely 
with CTDOT to develop solutions to minimize 
impacts wherever feasible. Our scope of work 
is to prepare the relocation design plans, 
specifications and cost estimate for the work.
Civil Design, Durham Meadows Waterline Road
Durham, CT
Served as Project Engineer for EPA funded 
project to bring a new water main into the Town 
of Durham, CT. Designed the civil roadway work 
of the water main and coordinated with town 
officials. Performed the water tank site design 
including drainage and grading. Also, executed 
the horizontal and vertical geometry for an 
access road to said tank site.
West Main Street Pedestrian Connectivity & 
Safety Improvements 
New Britain, CT
Serves as Project Manager in order to coordinate 
design services, public outreach, and the 
prepare design plans, special provisions and 
bid documents for the West Main Pedestrian 
Connectivity & Safety Improvements Project. The 
project is funded for construction through the 
Community Connectivity Program via the Office 
of Policy & Management. The improvements 
proposed for the project are meant to provide 
safer pedestrian connectivity, increased 
accessibility, improved operations for vehicular 
travel and will enrich surrounding neighborhoods. 
The proposed improvements include replacement 
of the existing concrete sidewalk along with 
a new brick paver shelf or turf establishment, 
concrete sidewalk ramps, concrete driveway 
ramps, resetting and/or replacement of curbing, 
new catch basin tops, addition of street trees 
along West Main Street and line striping as 
appropriate. 
Arch Street Complete Streets Improvements 
Project
New Britain, CT
Serves as Project Manager for design services, 
public outreach, and the preparation of Design 
Plans, Special Provisions and Bid Documents for 
the Arch Street Complete Streets Improvements 
Project, funded for construction through the 
LOTCIP Program. The proposed improvements 
for Arch Street will utilize a “Complete Streets” 
design approach, including elements such as 
brick pavers, ornamental street lighting, street 
trees, placemaking elements, and the addition 
of mid-block pedestrian crossings and sidewalk 
widening to help encourage activities such as 
outdoor dining. These curb extensions will reduce 
vehicle speeds and crossing distances, allow 
for outdoor dining areas and provide space for 
street trees, planters, and other enhancements.
Highwood Farms Roadway Evaluation
Thomaston, CT
Served as Project Manager responsible for 
the evaluation of several roadways within the 
Highwood Farms neighborhood.  Our Team 
evaluated the condition of the existing roadways 
and created a report with our findings. The report 
provided recommendations for how best to 
rehabilitate the existing roadways by completing 
pavement and subbase cores and providing 
backup based on best engineering practices. This 
report was used as the basis for future planning 
for Capitol projects for the Town.

Page 91

BL Companies  
Dominick J. Celtruda
PLA, ASLA
Principal Landscape Architect
Summary of Qualifications 
Mr. Celtruda is a seasoned professional with over 28 
years of experience in planning, design, construction, 
and maintenance of corporate, commercial, institutional, 
educational, and municipal sites.
Dominick’s expertise includes conducting in-depth studies to 
identify and quantify key factors that inform the planning and 
design process, ensuring spaces are thoughtfully shaped for 
optimal use and enriched social and cultural interaction.
Mr. Celtruda specializes in site analysis, concept development, 
schematic design, design development, contract 
documentation, construction detailing, bidding, construction 
administration, project management, presentation graphics, 
and the creation of design guidelines. As Principal Landscape 
Architect at BL Companies, he provides expert landscape 
architecture and liaison engineering services to a diverse 
portfolio of public and private clients.
Relevant Experience 
Francis Walsh Intermediate School Athletic Field 
Improvements
Branford, CT
Served as Project Manager for the revitalization of the outdoor 
areas at Francis Walsh Intermediate School, focusing on the 
multi-use athletic fields and softball field to enhance physical 
education, athletics, recess, and environmental enrichment. 
Building on previous renovations completed in 2021, this project 
introduced universal accessibility, update outdated elements, 
and add new features to enrich both the school and broader 
community.
Provided athletic field design and construction administration 
services, delivering key improvements such as replacing the 
existing recess swing structures and adding new playscape 
elements. The project also involved removing the aerial ropes 
course and baseball field, installing a regulation basketball court 
and half court, regrading the softball outfield, and creating 
accessible pathways throughout the site. Two natural turf fields 
were converted to synthetic turf with lighting and seating, 
HIGHLIGHTS
YEARS IN THE INDUSTRY
28
EXPERTISE
Landscape Architecture
Master Planning
PROJECT ROLE
Landscape Architecture
EDUCATION
AAS, Landscape Development, 
SUNY College, 1994
Bachelor of Landscape 
Architecture, SUNY College, 
1997
REGISTRATIONS
Professional Landscape 
Architect: CT, MA, ME, NC, NH, 
NJ, NY, OH, RI, SC, TN, TX 
PROFESSIONAL MEMBERSHIPS
CT Landscape Architecture 
Board, Commissioner
American Society of 
Landscape Architects, CT 
Chapter, Member

Page 92

BL Companies  
Dominick J. Celtruda
PLA, ASLA
and the existing running track was replaced with 
a three-lane walking track. Additional upgrades 
included a seasonal restroom area, enhancements 
to the wetland buffer with naturalized plantings, 
rain gardens (bioretention), and a pollinator garden. 
An outdoor classroom and environmental education 
area were also introduced. These comprehensive 
enhancements transformed the school’s outdoor 
spaces into a modern, accessible, and sustainable 
environment for both student activities and 
community use.
Plymouth High School
Plymouth, CT
Served as Design Landscape Architect, assisting 
with contract documents and contract 
administration services for the new high school. The 
design included 250 parking spaces; bus and parent 
drop-off areas; site layout; an athletic complex 
consisting of a baseball field, football field/soccer 
field, running track, and softball field; utility plan; 
grading plan; erosion and sediment control plan; 
planting plan; and stormwater management plan.
Eldrege Elementary School Softball Field and 
Basketball Courts Renovation
East Greenwich, RI
Served as Project Manager who contributed to the 
renovation of the athletic facilities at Eldredge 
Elementary School, focusing on upgrading both the 
softball and basketball fields. The project involved 
replacing the existing, outdated fields with new, 
high-quality athletic surfaces to enhance playability 
and safety. Was responsible for the design of a new 
pergola gathering space adjacent to the fields, 
providing a shaded area for community use. For 
the softball field, he developed a comprehensive 
irrigation system to ensure efficient water use and 
maintain optimal field conditions. The basketball 
court received a new, durable play surface, 
improving its longevity and usability. In addition, he 
worked to enhance ADA accessibility throughout 
the site, ensuring that all students and community 
members could enjoy the facilities. These upgrades 
transformed the school’s outdoor areas into 
modern, functional, and inclusive spaces for 
recreation and learning.
Guilford High School Tennis Courts
Guilford, CT
Served as Landscape Architect and created 
bid specifications for alterations and repairs 
to six tennis courts at Guilford High School. 
Compiled an Evaluation Report that contained 
an existing conditions investigation along with 
recommendations on specific renovations and 
upgrades that were required. Also included was a 
comprehensive cost breakdown of all recommended 
improvements. The analysis also incorporated the 
use of Quick Start Courts (youth tennis courts). 
East Hartford High School Tennis Courts
East Hartford, CT
Served as Landscape Architect and created 
bid specifications for alterations and repairs to 
eight tennis courts at East Hartford High School. 
Compiled an Evaluation Report that contained 
an existing conditions investigation along with 
recommendations on specific renovations and 
upgrades that were required. Also included was a 
comprehensive cost breakdown of all recommended 
improvements. The analysis also incorporated the 
use of Quick Start Courts (youth tennis courts).
Portsmouth High School Tennis Courts
Portsmouth, NH
Served as Project Manager and created 
construction documents and bid specifications 
for alterations and repairs to convert 4 courts 
to six and add new court lighting at Portsmouth 
High School. Compiled an Evaluation Report that 
contained an existing conditions investigation along 
with recommendations on specific renovations and 
upgrades that were required. Also included was a 
comprehensive cost breakdown of all recommended 
improvements.

Page 93

BL Companies  
Christen Robbins
AIA, LEED AP, MBA 
Senior Project Manager
Summary of Qualifications 
With 18 years of experience in architecture and project 
management, Christen brings a wealth of expertise 
across a diverse range of industries, including multi-family 
housing, self-storage, retail, higher education, hospitality, 
healthcare, and commercial projects. 
As a Project Manager at BL Companies, Christen excels in 
overseeing the entire project delivery process, ensuring every 
project meets the client’s design vision, stays on schedule, and 
remains within budget.
Christen’s role also involves providing technical expertise and 
conducting thorough quality control reviews, resulting in well-
coordinated and constructable project documents. Passionate 
about delivering exceptional results, Christen combines 
strategic oversight with a deep understanding of design and 
construction to bring every project to life with precision and 
excellence. 
Relevant Experience 
University of Connecticut Tennis Locker Room
Storrs, CT
Served as Architectural Project Manager/Project Architect for 
a new athletic building along Avalonia Way adjacent to the 
existing Tennis Court facility. The project is to install a precast 
concrete modular building equipped with water, gas, sewer, 
heat, telephone and data. The building provides on-site locker 
facilities, athlete restroom, public restroom, coaches/officials 
restroom/changing room, flex office/meeting space and support 
space (i.e. janitorial, MEP equipment). The project also proposes 
to construct parking with improved pedestrian access should 
funding accommodate this additional work. Design documents 
were completed in early 2025 with construction completed at 
the end of 2025. 
  
HIGHLIGHTS
YEARS IN THE INDUSTRY
18
EXPERTISE
Architecture
Project Management
Multi-Family, Self-Storage, 
Healthcare
PROJECT ROLE
Architecture
EDUCATION
Bachelor of Architecture, 
Roger Williams University, 2006 
Master of Business 
Administration, Post 
University, 2021 
REGISTRATIONS
Registered Architect: CT 
(2022); MA (2022); NJ (2022); 
RI (2011) 
PROFESSIONAL MEMBERSHIPS
American Institute of 
Architects (AIA)
NCARB
USGBC LEED AP BD+C

Page 94

BL Companies  
Christen Robbins
AIA, LEED AP, MBA 
Peckham Farms and Hart House
Kingston, RI
Served as Project Manager/Project Architect 
for the renovation of the buildings at Peckham 
Farms and Hart House for accessibility 
upgrades.  The project included the renovation 
of bathrooms to be ADA compliant and the 
construction of a ramp on the exterior to 
provide accessible access at both buildings 
Osborn Hill Elementary School
Fairfield, CT
Architectural Project Manager and Architect 
of Record for an $8.1 million renovation of 
a 55,000 square foot elementary school.  
Mechanical, electrical, plumbing, fire 
protection, architectural, structural, and civil 
design services associated with new HVAC 
systems to serve 32,000 square feet of the 
school.  New systems included packaged 
rooftop air-handling units, packaged dedicated 
outside air systems (DOAS), variable refrigerant 
flow (VRF) systems, building management 
system (BMS) upgrades throughout the facility, 
structural modifications to support mechanical 
equipment, new electrical service, lighting, 
ceilings, and security vestibules.  Design 
services were completed in 2024 Stonington 
YMCA Conversion
Stonington, CT
Serving as Project Manager/Project Architect 
for the conversion of an existing movie theater 
into a YMCA pickleball court complex and 
a 5,000 SF space for residential amenities.  
Responsibilities include programming of the 
existing building, design of the exterior, and 
coordination with the various stakeholders.  
Further, responsibilities included completion 
of a demolition package for pricing and will 
support through the site entitlement.  
Fairfield Warde High School
Fairfield, CT
Architectural Project Manager and Architect of 
Record for a $36 million renovation of a 318,000 
square foot high school.  Mechanical, electrical, 
plumbing, fire protection, architectural, 
structural, and civil design services associated 
with new HVAC systems to serve 142,000 SF of 
the school. 
Montgomery Community College Recreation 
Complex
PA
Served as Architectural Project Manager for 
the design of a restroom building to serve the 
surrounding athletic fields.  Coordinated with 
civil and landscape teams for masterplanning 
of the field complex, identifying the building’s 
footprint and square footage, orientation, 
access, and integration with the landscape.  
Architecture services included conceptual 
floor plan, exterior elevations, and concept 
rendering.
Roger Williams Parks – Facility Assessments: 
Historic Structures: Casino, Boathouse, 
Temple to Music
Providence, RI
Served as Project Manager for the facility 
assessment of three historic structures with 
the Roger Williams Park complex. Project 
responsibilities included observations of 
the existing structures to identify repairs or 
modifications, managing of the completion of 
the report, design, and documentation of a 
café concept, and estimating of the work to 
be completed. Design services were completed 
in 2020.

Page 95

BL Companies  
Christopher Albino
PE
Manager of Structural Engineering
Summary of Qualifications 
Mr. Albino is a highly accomplished Structural Engineer 
with over 34 years of experience delivering innovative and 
efficient design solutions across the public and private 
sectors.
His expertise encompasses the structural design of a diverse 
range of projects, including retail, industrial, municipal, and 
residential buildings, ensuring durability, safety, and compliance 
with industry standards.
In addition to his structural engineering proficiency, Mr. 
Albino brings extensive experience in project management, 
photovoltaic design, site development, roadway design, and 
geotechnical investigations. His multidisciplinary knowledge and 
strategic approach enable him to drive complex projects to 
successful completion while maintaining the highest standards 
of quality and performance.
Relevant Experience 
Eastern Connecticut State University, Softball Field
Willimantic, CT
Served as Manager of Structural Engineering for the design of 
dugouts and concession building for this college softball field. 
Project responsibilities included management of the structural 
team during the design and construction of these structures, 
along with shop drawing review for the structural package. 
Coordination with the Architect, Civil Engineer and Landscape 
Architect was included in this project.
Dunkin Donuts Park (Stadium for the Hartford Yard Goats)
Hartford, CT
Served as Manager of Structural Engineering for the re-design 
of the outfield seating levels and concourse for this 17,000-seat 
baseball stadium. Project responsibilities included client liaison 
and management of the structural team during the design and 
construction of this steel-framed precast seated structure with 
ground improvements. The schedule of this project demanded 
a “fast-track” approach to the design and shop drawing 
review for the structural package. Coordination with the design 
HIGHLIGHTS
YEARS IN THE INDUSTRY
34
EXPERTISE
Structural Engineering
Project Management
PROJECT ROLE
Structural Engineering 
(Buildings)
EDUCATION
Bachelor of Science in Civil 
Engineering, REnsselaer 
Polytechnic Institute, 1990 
REGISTRATIONS
Professional Engineer: AL, AR, 
CO, CT, DE, DC, FL, GA, IN, KY, 
ME, MD, MA, MI, MO, NE, NH, NJ, 
NY, NC, OH, PA, RI, SC, TN, TX, 
VT, VA, WV, WI 
Canada: AB, BC, ON
PROFESSIONAL MEMBERSHIPS
Association of Professional 
Engineers and Geoscientiests 
of Alberta, Member
NCEES Record Holder
AISC 
ASCE

Page 96

BL Companies  
Christopher Albino
PE
Architect, the production Architect, the 
Contractor, the Owner and the City of Hartford 
was included in this project. Design services 
were completed in the Spring of 2017.
Light Tower Assessment at Robert Palmer 
Field
Waterbury, CT
Manager of Structural Engineering for the 
structural analysis of several existing 80-foot-
tall truss-type light tower stanchions for field 
lighting at the former minor league ballpark 
in Waterbury, CT. The analysis included a field 
investigation of the existing tower structural 
components, review of the original foundation 
design drawings, and preparing a structural 
model of the tower with various loading 
conditions. The deliverable was a report 
outlining our findings, and recommendations 
for upgrades or replacements.
SEMA4
Stamford, CT
Served as Senior Structural Engineer for design 
of the additions and alterations to the existing 
facility. This work included assessing the 
existing structure for the proposed conversion 
of existing office space to clinical laboratories, 
as well as the engineering required for the 
addition of an exterior loading dock and a 
freight elevator within the building.  Studies of 
roof loadings were performed to assess the 
feasibility of a roof-top terrace.  Additional 
responsibilities included flood calculations 
for the exterior loading dock, structural shop 
drawing review and structural construction 
administration.
Southington Senior Center
Southington, CT
Served as Manager of Building Engineering for 
the design of a 22,600 SF senior facility. Project 
responsibilities included management of the 
structural and MEP team during the proposal 
and design of this steel-framed single-story 
structure, as well as QA/QC of the structural 
design. 
Municipal Solar Installations
Multiple Locations in Newington, CT
Served as Project Manager and Structural 
Engineer for the design of several 150 to 250kW 
roof-mounted solar arrays on the roof of 
existing municipal facilities, which will be tied 
into the building’s electrical service. As part of 
the work, a structural analysis of the existing 
roof was performed, to verify adequate 
capacity to carry the additional weight of the 
solar panels.  The systems incorporated solar 
modules on proprietary racking with ballast 
blocks and will include electronic monitoring 
and metering for the utility company.
Potential Re-use Analysis, Colony Street
Meriden, CT
Served as Manager of Structural Engineering 
for an adaptive re-use analysis of four historic 
buildings on Colony Street in downtown 
Meriden. Analysis included a conditions 
evaluation of the buildings’ structural framing 
systems, along with load rating of floor/roof 
structures.
Elmwood Community Center
Waterbury, CT
Served as Manager of Structural Engineering 
for the structural design of this 2-story 
community building in a dense neighborhood in 
Waterbury, CT. Responsible for the design and 
preparation of construction documents for this 
wood-framed structure. 

Page 97

BL Companies  
Brian Reilly
PE
Senior Engineer II
Summary of Qualifications 
Mr. Reilly is a highly accomplished Senior Engineer with 
over 15 years of expertise in civil and bridge engineering, 
specializing in bridge design, load rating, and inspections. 
His extensive skill set encompasses bridge design and 
rating, structural inspections, construction oversight, and 
project management.
Throughout his career, Mr. Reilly has successfully administered 
and managed complex bridge design projects, overseeing key 
aspects such as project scoping and agreements, scheduling, 
budget management, environmental permitting, rights-of-way 
coordination, and utility management.
In his current role at BL Companies, Mr. Reilly takes the lead in 
designing primary structural bridge components, developing 
detailed contract drawings and construction specifications, 
and conducting rigorous reviews of structural calculations, 
cost estimates, and technical reports. Additionally, he serves 
as a consultant liaison engineer, providing expert guidance and 
ensuring seamless administration of bridge design projects.
With his extensive experience and hands-on approach, Mr. 
Reilly consistently delivers innovative and reliable engineering 
solutions, driving the success of infrastructure projects from 
concept to completion.
Relevant Experience 
Main Street over Rippowam River
Stamford, CT
Served as the Senior Bridge Engineer for the Main Street Bridge 
over Rippowam River for the City of Stamford.  This project 
involved performing a Bridge Study of the 136-year-old historic 
two-span wrought iron pin-connected lenticular pony-truss 
supported by stone masonry abutments and center pier, with 
eight intermediate concrete piers. The Main Street bridge 
located in the busy downtown Stamford has been closed to all 
traffic for several years due to its condition, had been slated to 
be replaced in the past, however, public outcry has halted any 
movement on this project over the past 25 years. BL prepared 
HIGHLIGHTS
YEARS IN THE INDUSTRY
15
EXPERTISE
Bridge Engineering
Civil Engineering
PROJECT ROLE
Structural Engineering 
(Bridges)
EDUCATION
Bachelor of Science in Civil 
Engineering, University of New 
Haven, 2010
REGISTRATIONS
Professional Engineer: CT, MA 
RI 
NCEES Recordholder
PROFESSIONAL MEMBERSHIPS
NHI - Safety Inspection of 
In-Service Bridgees, 2017 
NHI -Bridge Inspection 
Refresher Training, 2020

Page 98

BL Companies  
Brian Reilly
PE
a bridge study with alternative concept plans 
for replacement, rehabilitation, and removal 
including construction costs, and a decision 
matrix with a report reviewing various design 
considerations of each alternative. This 
project required special attention working with 
historians to carefully consider historical and 
cultural implications of each alternative. 
Ash Creek Pedestrian Bridge and Multi-Use 
Trail
Bridgeport, CT
Serves as a Senior Engineer for the Ash Creek 
Bridge and Multi-Use Trail project which will 
provide a 225-foot landmark pedestrian 
bridge spanning Ash Creek between the City 
of Bridgeport and Town of Fairfield. Project 
responsibilities include preparation and review 
of design calculations, Plans, Specifications, 
estimates to develop contract documents.
Replacement of Bridge No. 158-021, Kings 
Highway North over Willow Brook
Westport, CT
Served as the Lead Design Engineer for the 
replacement of the Kings Highway North Bridge 
over Willow Brook for the Town of Westport 
under the Connecticut Department of 
Transportation’s State Local Bridge Program.  
This project involved the replacement of the 
existing historic single-span masonry bridge 
with a 22’ three-sided ridged frame on a 
spread footing. The project required special 
attention to aesthetics due to the historic 
sensitivity, water handling details, structural 
design and details for the bridge and wingwall 
replacement, and roadway design and details. 
The project also requires hydrologic and 
hydraulic analysis, drainage analyses, rights-
of-way, utility, and permit coordination in the 
environmentally and historically sensitive tidal 
marsh of Westport, CT. 
Louisiana Avenue Bridge Replacement (SPN 
17-188)
Bristol, CT
Served as a Lead Design Engineer for the 
replacement of the Louisiana Avenue Bridge 
over Coppermine Brook for the City of 
Bristol under the Connecticut Department 
of Transportation’s Federal Local Bridge 
Program.  This project involved the replacement 
of the existing two-span bridge with a 
49’-6” single span voided slab bridge. The 
project required water handling details, 
structural design and details for the bridge 
replacement, construction staging plans, and 
roadway design and details. The project also 
requires hydrologic and hydraulic analysis, 
drainage analyses, rights-of-way, and utility 
coordination. Project responsibilities included 
development assisting in the design and 
detailing of structural components plan 
drafting and review, preparation of special 
contract provisions, and developing and 
reviewing the cost estimate for construction. 
Humphrey Street Bridge Rehabilitation
New Haven, CT
Served as the Lead Design Engineer for 
the rehabilitation of the Humphrey Street 
Bridge over Mill River for the City of New 
Haven under the Connecticut Department of 
Transportation’s State Local Bridge Program. 
This project involves a bridge inspection, 
conditional assessment, and rehabilitation 
design of an existing three-span 84-foot 
voided slab deck unit bridge that was originally 
constructed in 1908. The project requires water 
handling details, scour countermeasure work, 
structural design and details for the bridge 
rehabilitation, and construction staging plans. 
The project also requires hydrologic analysis, 
rights-of-way, utility, and permit coordination. 

Page 99

BL Companies  
Steven Fraysier
PE
Senior Project Manager
Summary of Qualifications 
Mr. Fraysier is a seasoned transportation and infrastructure 
design professional with 17 years of experience in the 
public sector. He has successfully designed and managed 
numerous State and Municipal projects, as well as select 
private developments.
His technical expertise spans horizontal and vertical roadway 
design, superelevation, roadside safety features, multi-
use trails, and construction sequencing. He also leads the 
development of cost estimates, special provisions, property 
maps, and various project reports, ensuring accuracy and 
compliance with industry standards.
As a Senior Project Manager at BL Companies, Mr. Fraysier plays 
a pivotal role in project planning, budgeting, and execution. He 
develops scopes of work, fee proposals, and project schedules 
while managing budgets and progress reporting. He is adept 
at coordinating with State agencies, municipal governments, 
utility companies, consultants, and property owners to facilitate 
seamless project delivery. His expertise in MicroStation, InRoads, 
AutoCAD Civil 3D, Microsoft Project, and roadway quantity 
computations further enhances his ability to oversee complex 
infrastructure projects with precision and efficiency.
Relevant Experience 
Pawcatuck Sidewalk Improvements
Stonington, CT
Served as Senior Project Manager for the project. The project 
consisted of sidewalk enhancements to South Broad Street (U.S. 
Route 1) between Spellman Avenue and Mayflower Avenue in the 
Pawcatuck neighborhood of Stonington. The purpose of the 
project was to complete gaps in sidewalk accessibility within the 
project limits. BL performed a mobility analysis to investigate 
improvements for bicyclists and performed a traffic analysis 
to investigate the removal of a left turn lane to facilitate 
sidewalk construction. The project was scoped to provide up 
through a preliminary design, including public outreach. Project 
responsibilities included scope and fee development, oversight 
of multiple disciplines (sidewalk design, survey, traffic design), 
maintaining close contact with the Town throughout the 
HIGHLIGHTS
YEARS IN THE INDUSTRY
17
EXPERTISE
Transportation
Infrastructure Design
Project Management 
PROJECT ROLE
Transportation Engineering
EDUCATION
Bachelor of Science in Civil 
Engineering, University of 
Hartford, 2008
REGISTRATIONS
Professional Engineer: CT, MA, 
RI
PROFESSIONAL MEMBERSHIPS
American Society of Civil 
Engineers, Member
Connecticut Society of Civil 
Engineers, Member

Page 100

BL Companies  
Steven Fraysier
PE 
development of the scope, fee; coordination with 
CTDOT District 2; Managing survey, sidewalk, and 
traffic design teams to meet client deadlines for 
a Preliminary design submission.
International Drive Reconstruction
Windsor, CT
Serves as Project Manager II for work 
associated with the roadway reconstruction of 
approximately 4,800 LF of International Drive from 
Rainbow Road to Route 20. The existing roadway 
along International Drive is deteriorating and 
seeing subbase failures due to the large volume 
of heavy vehicles that utilize the corridor on a 
daily basis. Pavement sections were designed 
to efficiently increase the durability and 
sustainability of the proposed corridor for the 
heavy traffic volumes. The project was designed 
to have two (2) construction phases in order for 
the Town to secure the appropriate funding to 
complete construction. Project responsibilities 
include overseeing the development of 
construction plans, profile and cross sections, 
cost estimation, and development of standard 
specifications.
Stratfield Road at Fairfield Woods Intersection 
& Corridor Streetscape Improvements
Fairfield, CT
Served as Senior Project Manager for the design 
improvements along the Route 59 (Stratfield 
Road) corridor from Owen Fish Park to Montauk 
Street. The project was funded partially by 
Urban Act grant funds and required approval 
by CTDOT through the encroachment permit 
review process. Proposed improvements 
included new sidewalks and sidewalk ramps, 
signal improvements at the Fairfield Woods 
Road & Stratfield Road intersection, decorative 
pedestrian lighting design, and landscaping and 
complete street improvements like on-street 
parking accommodations. 
Silas Deane Highway Pedestrian Improvements 
Phase III
Rocky Hill, CT
Served as Project Manager for the project. The 
project consisted of streetscape enhancements 
to the Silas Deane Highway / Main Street (Route 
99) including replacement of the sidewalk within 
the project limits, pedestrian level lighting 
adjacent to the new sidewalks, decorative 
landscape canopy trees and plantings that are 
appropriate for utility corridors, and pedestrian 
amenities such as bus shelters and benches. 
Project responsibilities included scope and fee 
development, oversight of multiple disciplines 
(landscape design, survey, sidewalk/roadway 
design), maintaining close contact with the Town 
throughout the development of the scope, fee, 
and municipal agreement with the Connecticut 
Department of Transportation; Managing survey, 
roadway, landscape, and electrical/illumination 
design teams to meet client deadlines for 
Preliminary and Final Plans for Review design 
submissions; Utility coordination. Design Services 
are complete. 
Bloomfield Greenway Multi-Use Trail
Bloomfield, CT 
Served as Project Manager for the transportation 
design team during the design and construction 
of a three-mile long multi-use trail in the Town 
of Bloomfield that will eventually serve as 
a connection to the East Coast Greenway 
trail system. Design of the trail had several 
restrictions including reducing wetland 
impacts, limiting private property impacts and 
accommodating the existing overhead utility 
corridor through which the trail passes. 

Page 101

BL Companies  
Michael Dion
PE, PTOE
Senior Project Manager
Summary of Qualifications 
Michael brings over 27 years of expertise in traffic 
engineering and transportation planning. As a Senior Project 
Manager at BL Companies, he oversees and manages 
the entire project delivery process, including planning, 
scheduling, scope, and budgeting, ensuring seamless 
execution and client satisfaction.
Mr. Dion has served as the traffic project lead on a wide 
range of initiatives, including major highway and roadway 
improvements, realignments, intersection upgrades, resurfacing, 
and safety enhancements. He is highly proficient in CTDOT and 
FHWA Design Standards and the preparation of all necessary 
project documentation.
His technical expertise spans traffic signal design, traffic 
impact studies, capacity and level-of-service analysis, safety 
and crash analysis, traffic simulation modeling, roadway 
lighting design, maintenance and protection of traffic planning, 
pavement marking, and signing design. With a comprehensive 
understanding of traffic analysis tools such as SYNCHRO, 
Highway Capacity Software, TSDWIN, Highway Safety Analysis 
software, SimTraffic, and lighting design software including 
Visual and AGI32, Mr. Dion delivers data-driven, innovative 
solutions tailored to project needs.
Relevant Experience 
Fred Wolfe Park Access Parking and Safety Study
Orange, CT
Served as Traffic Lead to develop an access, parking and safety 
study for town-owned lands, referred to as Fred Wolfe Park.  
The project included working with the Town of Orange, Fred 
Wolfe Park commission, and stakeholders to review access, 
circulation and parking and to provide safety recommendations 
for the park in terms of pedestrian, bicycle, and motor vehicles.  
Specifically, it related to a new playground / playscape, and 
associated improvements that were implemented by the Town.
HIGHLIGHTS
YEARS IN THE INDUSTRY
27
EXPERTISE
Traffic Engineering
Transportation Planning
State and Municipal 
Infrastructure
PROJECT ROLE
Traffic Engineering
EDUCATION
Bachelor of Science in Civil 
Engineering, University of 
Rhode Island, 1998 
REGISTRATIONS
Professional Engineer: CT, FL, 
KY, MA, NH, NJ, NC, OR, PA, RI, 
SC 
Professional Traffic 
Operations Engineer 
PROFESSIONAL MEMBERSHIPS
Institute of Transportation 
Engineers

Page 102

BL Companies  
Michael Dion
PE, PTOE 
360 Degree Video Detection System – Phase 
1 and 2
Stamford, CT
Serves as Project Manager on this complete 
street project in the City of Stamford, 
Connecticut. Work for this LOTCIP (Local 
Transportation Capital Improvements Program) 
Project was done CTDOT and City of Stamford 
Traffic Signal standards. Work included the 
CAD drafting of video detection system 
installations at 91 City owned signals and 
oversaw the implementation of an adaptive 
signal system design on West Main Street (10 
signals). 
Hope Street Improvement Project
Stamford, CT
Served as Project Engineer responsible 
for performing traffic analysis of three 
interconnected intersections utilizing SYNCHRO 
(Version 7) traffic signal coordination software. 
Prepared three traffic signal plans to City of 
Stamford standards including special provisions 
and cost estimates.  Including special 
provisions and cost estimates.  
Northford Center Connectivity Study, 
SCRCOG
North Branford, CT
Serves as Project Manager for a connectivity 
improvement study in the Town of North 
Branford, CT.  BL Companies has been 
commissioned by the South Central Regional 
Council of Governments (SCRCOG) and Town 
of North Branford to provide planning services 
and a study for connectivity improvements 
in Northford Center. The team is working 
with SCRCOG, the Town of North Branford, 
Connecticut Department of Transportation 
(CTDOT) and community stakeholders to 
incorporate the vision for the Northford Center, 
which aims to accommodate multiple modes 
of transportation, while addressing safety and 
congestion issues for the neighborhood and 
visitors alike.  
Route 229 Corridor Study, Naugatuck Valley 
Council of Governments
Southington / Bristol, CT
Served as Project Manager for a transportation 
planning study of six miles of CT Route 229 
in Southington and Bristol, CT.  The study 
addressed safety, congestion, the transit 
system, and pedestrian/bicycle mobility and 
assessed travel demand growth and its 
potential impacts to area roadways, including 
traffic associated with development of 
underutilized properties within the Study Area. 
Traffic Signal Design at Rubber Avenue 
and Melbourne Avenue/Hoadley Street 
Intersection 
Naugatuck, CT
Served as Project Manager for a traffic 
signal design project at the intersection of 
Rubber Avenue and Melbourne Avenue/Hoadley 
Street. As Project Manager, he oversaw the 
final submittal of the bid documents for the 
Borough of Naugatuck.  The project involved 
survey, capacity analysis of the existing 
skewed intersection and development of 
traffic signal plans for a complete replacement 
of the existing traffic signal hardware including 
controller cabinet and signal heads, while 
calling for new vehicle detectors, pavement 
markings and pedestrian signal phase. The 
project also includes the addition of some 
limited streetscape elements like sidewalk and 
handicap ramps as well as recommendations 
of drainage improvements at the intersection. 

Page 103

BL Companies  
Robert Roles 
PE
Principal Engineer
Summary of Qualifications 
With decades of experience, Mr. Roles combines technical 
engineering knowledge with strong public communication 
skills. His capabilities in utility design, site planning, and 
infrastructure development ensure effective and reliable 
project outcomes.
Mr. Roles brings 30 years of engineering experience, including 
more than 15 years dedicated to civil engineering. His expertise 
spans site layout and subdivision design, utility assessments and 
relocations, and comprehensive roadway design. He is adept 
at presenting engineering concepts and plans to public forums, 
local commissions, and approval agencies. Mr. Roles’ extensive 
background includes the analysis and design of stormwater 
and septic systems, as well as the inspection and design of 
water and sewer utilities, flood protection infrastructure, and 
roadways. His ability to manage both technical execution and 
public communication makes him a valuable asset in complex 
civil projects.
Relevant Experience 
Francis Walsh Intermediate School Athletic Field 
Improvements
Branford, CT
Served as Civil/Site Engineer of Record for the revitalization 
of the outdoor areas at Francis Walsh Intermediate School, 
focusing on the multi-use athletic fields and softball field 
to enhance physical education, athletics, recess, and 
environmental enrichment. Building on previous renovations 
completed in 2021, this project introduced universal accessibility, 
update outdated elements, and add new features to enrich 
both the school and broader community.
Grading and drainage designs for multiple use fields utilizing 
Low Impact Design Elements and Best Management Practices 
to provide fully accessible, modern athletic areas in a natural/
sustainable setting while improving stormwater management 
and water quality. Provided design services and construction 
administration throughout the project.
HIGHLIGHTS
YEARS IN THE INDUSTRY
30
EXPERTISE
Civil Engineering
PROJECT ROLE
Civil Engineering
EDUCATION
Bachelor of Science, General 
Engineering, University of New 
Haven, 2005
Bachelor of Science, Civil 
Engineering, University of New 
Haven, 2005
REGISTRATIONS
Professional Engineer: CT, MA, 
NY, PA
PROFESSIONAL MEMBERSHIPS
American Society of Civil 
Engineers

Page 104

BL Companies  
Robert Roles 
PE
Land Development Project
Stratford, CT
Civil/Site Engineer of Record for a 200-acre 
site development that involves expensive 
environmental cleanup/capping. The site is 
also being designed for flood resiliency and will 
also involve the coordinated decommissioning 
of six stormwater pump stations, the design 
of one new stormwater pumping station and 
the replacement of a sewer pump station. 
Production of phased construction plans and 
SWPPP monitoring and permitting are ongoing. 
Site Design and Construction is underway and 
is expected to continue for several years.
Camp Hartell Sewer Main
Windsor Locks, CT
Design of 2,150 feet of domestic sewer in 
coordination with the military base Master Plan.
Peer Review Services
Various Projects, Regulatory Authorities and 
Municipalities 
Provided Engineering Opinion and Standard 
of Care evaluations for various applications 
before several authorities having jurisdiction 
in multiple municipalities.  Performed peer 
reviews of submittal packages inclusive of 
existing and proposed plans/details, design 
reports, calculations, geotechnical reports, 
and environmental reports. Reviewed prior 
board or commission meetings and/or findings, 
conducted site meetings with or without 
applicant’s design professionals and met with 
local conservation groups and concerned 
constituents. Provided the authority having 
jurisdiction with a written report detailing the 
proposed development and how it either meets 
currently adopted regulations and/or how the 
proposed work deviates from them.  Presented 
our findings in public hearings and/or testified 
to them as needed.
Uncas-on-Thames Roadway (Route 32)
Norwich, CT
Design of roadway, drainage modifications and 
utility relocations to provide STC mandated 
intersection improvements at the Uncas-On-
Thames Hospital Campus. Coordinated through 
CTDOT and CT DPW.
Route 82/ New London Turnpike
Norwich, CT
Design of roadway, drainage modifications, 
utility relocations and pedestrian walks along 
Route 82 and New London Turnpike in support 
of Three Rivers Community College expansion. 
Coordinated through the CTDOT and CT DPW. 
Water Main Relocation, South Norwalk 
Electric and Water
Norwalk, CT
Design Engineer for the analysis and design 
of temporary and permanent water mains for 
three bridges crossings over a widened section 
of Interstate 95. Project involved coordination 
with CTDOT, SNEW and a Norwalk streetscape 
project.
Renovations to B-Lot and Additional Parking, 
Manchester Community College
Manchester, CT
Design Engineer and Construction 
Administrator for B-Lot Parking Lot Renovation. 
Design and permitting for complete parking 
lot renovation including LED lighting, electrical 
vehicle charging Stations, low maintenance 
rain gardens, dedicated bus drop off for Great 
Path Academy, as well as improvements to 
other parking lots on campus. Project involved 
coordination of sub consultants, coordination 
with the Connecticut State Colleges & 
Universities Board of Regents for Higher 
Education and CT DCS.

Page 105

BL Companies  
Donald Smith
PLS
Senior Project Manager - Survey
Summary of Qualifications 
Mr. Smith brings over 30 years of extensive experience in 
surveying and mapping, serving diverse sectors including 
energy, public infrastructure, education, and commercial 
and residential development.
His expertise spans land surveying, mapping, construction 
stakeout, and project management for complex projects such 
as bridges, large-scale building construction, educational 
facilities, pipelines, electric transmission lines, railroads, and 
major retail centers.
As a Senior Project Manager at BL Companies, Mr. Smith 
plays a pivotal role in executing and overseeing boundary and 
topographic surveys, construction stakeout, survey calculations, 
deed and title research, and ALTA/NSPS Land Title Surveys. He 
also leads the firm’s innovative 3D Laser Scanning and UAV 
Technology initiatives, having developed policies and procedures 
that enhance efficiency and precision in these services. His 
leadership and technical expertise ensure the successful 
execution of high-quality surveying and mapping solutions for a 
wide range of projects.
Relevant Experience 
Raynham Middle School, Titicut Swamp Road
Raynham, MA
Served as Surveyor to complete layout of new construction of all 
structures, roadways, utilities and services, ball fields, detention 
basins and landscape features for new $30 million middle school.
Meeting House Elementary School, LEED Silver Equivalent
New Fairfield, CT
Served as Senior Crew Chief for the land surveying services 
required for the design of additions and renovations to the 
existing 84,000 SF elementary school that houses grades 3 
through 5. The project included the demolition of an existing 
12,650 SF, single-story, butler-type building wing that had 
surpassed its useful life and the creation of a new academic 
wing. The school was renovated as new while fully occupied 
over a 30-month period. Survey services included boundary/
topographic survey and extensive utility investigation for an 
HIGHLIGHTS
YEARS IN THE INDUSTRY
30
EXPERTISE
Surveying 
Mapping
Project Management
PROJECT ROLE
Land Surveying
EDUCATION
Associates of Civil 
Engineering/Structural, Bristol 
Community College, 2001
Bachelor of Arts in 
Earth Science, Southern 
Connecticut State University, 
1993
REGISTRATIONS
Licensed Land Surveyor: CT 
OSHA 10-Hour Outreach for 
Construction 
FAA UAS Remote Pilot License 
PROFESSIONAL MEMBERSHIPS
CT Association of Land 
Surveyors (CALS), Member

Page 106

BL Companies  
Donald Smith
PLS
on-site septic system. 
Norwich Technical High School
Norwich, CT
Served as Crew Chief responsible for the 
control establishment and construction 
stakeout on a large expansion to the campus 
facility. Stakeout of column lines, volume 
computations and providing elevations during 
the phased construction were a part of this 
work.
Trumbull High School
Trumbull, CT
Served as Senior Project Surveyor responsible 
for the control establishment and construction 
stakeout computations for an auditorium 
addition. Primary tasks included verification 
of layout by contractor’s surveyors, baseline 
computations, column line and anchor bolt 
locations and verification.
Churchill Place Reconstruction
Dedham, MA
Served as Senior Survey Project Manager 
for the land surveying and mapping required 
to support the design of the full-depth 
reconstruction of Churchill Place in-order-to 
transfer ownership of a private Right-of-Way 
to the Town of Dedham. The project includes 
survey, full-depth roadway reconstruction, 
new concrete sidewalks, drainage design and 
installation of granite property bounds. 
Shared Streets Improvements at St. James 
Avenue and Wellesley Street
Springfield, MA
Served as Project Manager on this pedestrian 
improvement project. Under a MassDOT Shared 
Streets Grant, BL Companies provided survey, 
traffic and transportation engineering services 
to the City of Springfield, MA.  BL Companies’ 
survey services included preparation of an 
existing conditions topographic survey of the 
intersection and immediate area to support 
proposed engineering design of pedestrian and 
intersection improvements at the intersection 
of St. James Street at Wellesley Street.  The 
purpose of this assignment was to improve 
the safety of pedestrians crossing St. James 
Street.  
Naugatuck Valley Council of Governments 
(NVCOG) Kinneytown Dam Project
Ansonia and Seymour, CT
Served as Senior Survey Manager of the 
land surveying and mapping services for the 
preparation of ALTA/NSPS Land Title Surveys 
for the three parcels totaling 170 acres owned 
by the Kinneytown Hydro Company, Inc. BL 
provided the final surveys of these parcels 
which extend over 2 miles along both sides 
of the Naugatuck River and the Metro North 
Waterbury Line railroad and included the 
reproduction of a large section of the town line 
between the City of Ansonia and the City of 
Seymour. In addition to ground survey, our FAA 
Part 107 licensed pilots flew the project corridor 
with our UAV to obtain video and photos of 
the dam and associated infrastructure and 
to create a high resolution georeferenced 
orthomosaic image for the project. The three 
ALTA/ACSM Land Title Surveys adjoined multiple 
subdivisions and required the reproduction of 
over a mile and a half of the CT Route 8 Right 
of Way and over 2 miles of the both sides 
of the existing Metro North Danbury Branch 
Railroad Right of Way. 

Page 107

BL Companies  
David M. Cicia
PE
Principal Engineer
Summary of Qualifications 
Mr. Cicia brings extensive expertise in transportation and 
hydraulic engineering, with a career spanning 27 years 
focused on hydrology, stormwater drainage design, roadway 
engineering, and environmental permitting for state, local, 
and private development projects.
Mr. Cicia comprehensive experience encompasses all aspects 
of hydraulic and drainage design, as well as navigating complex 
environmental permitting processes.
He is responsible for the development and review of hydrologic, 
hydraulic, and scour analyses, as well as storm sewer 
designs, FEMA Floodplain and Floodway analyses, and FEMA 
Letters of Map Revision (LOMRs). His work includes selecting 
appropriate design criteria, establishing analysis and design 
assumptions, and applying advanced modeling approaches and 
methodologies to deliver precise and effective solutions for 
transportation projects.
With his deep technical knowledge and proven track record, 
Mr. Cicia consistently delivers innovative designs and ensures 
compliance with regulatory standards, driving the success of 
infrastructure initiatives across diverse sectors.
Relevant Experience 
Deadman’s Brook Watershed Analysis and Myrtle Avenue 
Bridge Replacement
Westport, CT
Served as Principal Hydraulics Engineer for the analysis of 
the Deadman Brook watershed and Myrtle Avenue Culvert 
Replacement.  The Deadman Brook watershed analysis resulted 
in recommendations for future improvements to the stream 
throughout Westport.  The analysis included the hydrological 
macro-analysis of the whole stream, a planning level hydraulic 
analysis of required stream improvements along the course of 
the stream and a comprehensive list of recommendations for 
channel and structure improvements.  The analysis and design of 
the Myrtle Avenue Culvert replacement included permitting and 
preparation of bid documents.
HIGHLIGHTS
YEARS IN THE INDUSTRY
27
EXPERTISE
Transportation Engineering
Hydraulic Engineering
Environmental Permitting
PROJECT ROLE
Hydraulics & Drainage
EDUCATION
Bachelor of Science in Civil 
Engineering, University of 
Connecticut, 1998
REGISTRATIONS
Professional Engineer: CT, MA

Page 108

BL Companies  
David M. Cicia
PE 
Harbor Brook Trail and Channel Flood 
Mitigation Improvements, Bradley Avenue to 
Cooper Street
Meriden, CT
Served as Principal Hydraulics Engineer 
responsible for the hydraulic analysis and 
report preparation for the channel widening 
and lowering project designed to reduce 
flooding potential of Harbor Brook. The design 
also incorporated a ±4,900 linear foot multi use 
bicycle trail.  Responsibilities also included the 
submission of a CT DEEP Flood Management 
Certification application.  
On-Call Hydraulic and Drainage Engineering 
Services, U.S. Route 1 Drainage Study
Darien, CT
Served as Technical Manager and Engineer for 
this on-call contract with the Connecticut 
Department of Transportation.  This project 
focused on the flooding of the U.S. Route 1 area 
in Darien near Stony Brook.  Responsibilities 
included an analysis of the existing U.S. Route 
1 storm sewer network, the design of four 
alternates and the recommendation of a 
preferred alternate to alleviate flooding along 
the roadway and surrounding properties.  The 
study report included an analysis of the history 
of development along the U.S. Route 1 corridor, 
utility impacts, required permits and a cost 
estimate for each alternate.
Stormwater General Permit Support Services, 
Connecticut Department of Transportation
Statewide, CT
Serves as Design Professional for the 
independent review of all CTDOT projects 
requiring submission and approval of a 
CTDEEP General Permit for the Discharge of 
Stormwater and Dewatering Wastewaters 
Associated with Construction Activities 
application. This work includes the review 
of project information, contract plans and 
specifications including erosion control 
measures for conformance with the general 
permit and to the 2024 Stormwater Quality 
Manual.
Sumner Brook Flood Study
Middletown, CT
Served as Principal Hydraulics Engineer for the 
flood study of the Sumner Brook Watershed 
in Middletown, CT.  This project, funded by 
the City of Middletown, involved collecting 
flood data, field observations, and survey 
information to develop a 2-D unsteady flow 
model of the brook using Aquaveo’s SMS 
software and to recommend projects for the 
City to complete to eliminate areas of flooding.  
Responsibilities included the development 
of the hydrologic and hydraulic models and 
supporting report.
Ash Creek Pedestrian Bridge Replacement
Bridgeport, CT
Served as Principal Hydraulics Engineer for the 
analysis of a new 225-foot-long single span 
steel truss pedestrian bridge over Ash Creek, 
from the existing Fairfield Metro Center to 
the Black Rock Neighborhood in the City of 
Bridgeport. New multi-use trails on both the 
Fairfield and Bridgeport sides will provide an 
alternative mode of transportation and are 
in sustainability goals by lessening reliance on 
automobile transit.  Responsibilities include the 
preparation or oversight of hydraulic and scour 
reports, assisting the submission of an USACE 
Pre-Construction Notification Form and a CT 
DEEP Coastal permit application.

Page 109

BL Companies  
Matthew Stark
Senior Project Manager/Director of 
Construction Inspection Services
Summary of Qualifications 
Mr. Stark serves as the Director of Construction Engineering and 
Inspection Services at BL Companies, overseeing the financial 
and operational management of the group.
He plays a key role in strategic hiring, market expansion, and 
advancing paperless construction in alignment with FHWA’s “Make 
Every Day Count” initiative. Committed to innovation, he integrates 
new technologies into field operations while providing oversight and 
support to inspection staff across Connecticut. Recognized for his 
expertise in materials selection, installation methodologies, quality 
assurance, and contract administration, he is a trusted resource 
among colleagues, peers, and project owners.
In addition to his leadership role, Mr. Stark serves as a Chief 
Construction Inspector in the Transportation and Infrastructure 
Department when needed. With over 20 years of field experience, 
he specializes in construction inspections, contract compliance, 
and project coordination, particularly for CTDOT-administered 
projects. His expertise includes supervising construction work, 
ensuring specification adherence, managing progress payments, 
reviewing change orders, and overseeing final testing and approvals. 
He is instrumental in construction cost analysis, liaising between 
owners, contractors, and regulatory agencies to ensure seamless 
project execution.
Relevant Experience 
White Street and Locust Avenue Intersection Improvements, 
Project No. L034-001
Danbury, CT
Serves as Construction Coordinator of an intersection improvement 
project.  This project includes relocation of existing utilities, 
drainage improvements, road widening, construction of new 
sidewalks, milling and paving of roadway, and installation of 
new traffic lights.  Responsibilities included daily inspection 
of field activities and documenting in a daily written report, 
field measurements and quantity computations of accepted 
work, coordination of materials testing, maintaining inspection 
documentation to prepare payment estimates for the contractor, 
and quantity computation checks. 
HIGHLIGHTS
YEARS IN THE INDUSTRY
20
EXPERTISE
Construction Engineering and 
Inspection
PROJECT ROLE
Construction Inspection & 
Administration
EDUCATION
Associates Degree, General 
Studies, Manchester 
Community College, 2000
REGISTRATIONS
NICET Level III Highway 
Construction Inspection 
#131582
NETTCP Concrete Inspector 
Certification #2104
NETTCP HMA Paving Inspector 
#3063
PROFESSIONAL MEMBERSHIPS
OSHA 10-Hour Construction 
Program
American Safety and Health 
Institute Adult CPR and AED

Page 110

BL Companies  
Matthew Stark
Replacement of Bridge No. 04480 Louisiana 
Avenue over Coppermine Brook
Bristol, CT
Served as the Chief Construction Inspector 
for the replacement of the existing Louisiana 
Avenue Bridge over Coppermine Brook for the 
City of Bristol, CT. This project is funded in-
part under the Federal Local Bridge Program 
(FLBP). The project is a full superstructure 
replacement built on micropiles. The new bridge 
is a 53-foot single-span with reinforced pre-
stressed concrete deck units, supported by 
reinforced concrete abutments.  In addition 
to the new bridge, approximately 400 feet of 
roadway will be reconstructed, new drainage 
structures shall be installed, along with other 
utility relocations to be performed within the 
project limits. Full-time construction inspection 
is being provided in accordance with the 
FLBP Guidelines and the CTDOT District-1 
Office. Project documentation requirements 
followed both CONNDOT’s Municipal Manual and 
CONNDOT’s Construction Manual’s four-book 
system which requires strict material quality 
assurance and control testing. 
Arctic Street Bridge Replacement
Bridgeport, CT
Served as the lead Construction Inspector 
for the replacement of the existing Arctic 
Street Bridge over Yellow Mill Channel.  The 
project involved over-spanning the existing 
substructure with new pile-supported 
foundations that accepted the proposed 
precast concrete three-sided frame bridge 
to preserve the arch aesthetic appearance 
while relocating the utilities underground 
and addressing roadside safety.  Inspection 
services included daily observation of 
contractor’s activities, preparation of daily 
work reports, contractor and City coordination, 
utility coordination, material and laboratory 
testing, review of payment requisitions and 
change orders, as well as construction survey. 
Safe Routes to School, Sidewalk Extension
Southington, CT
Served as the Full-time Inspector for the 
construction inspection services for the Safe 
Routes to School, Sidewalk Extension project 
that is located from Crest Road to Woodruff 
Street in the Town of Southington. The 
improvements included two separate sidewalk 
extensions.  In addition to the new sidewalk, 
the project involved the construction of an at 
grade wetlands crossing to be constructed of 
a reinforced concrete slab and the installation 
of traffic calming elements and a crosswalk.
Farmington Canal Heritage Trail – Lazy Lane 
to Aircraft Road Project 
(State Project #131-203)
Southington, CT
Served in dual roles as Construction 
Coordinator and as Part-Time Chief 
Construction Inspector to provide on-site 
coordination, evaluation and inspection to 
remove existing railroad tracks and construct a 
multi-use trail of approximately 1.3 miles along 
the existing railroad corridor across the Town 
of Southington. Work included excavation, 
grading, paving, concrete sidewalks, concrete 
sidewalk ramps, decorative bituminous 
concrete crosswalks, repointed masonry of 
exiting historical Brownstone Bridge, under 
bridge luminaires, fences and metal beam 
rails, landscaping, improvements to bituminous 
concrete roadways at intersections, and 
removal and replacement of bituminous 
concrete curbing. Construction of this 
Southington segment is one of many trail 
segments along the FCHT under development 
for the trail system that will extend roughly 84 
miles from New Haven, CT to Northampton, MA. 

Page 111

BL Companies  
Sagan Simko
CPSS, PWS
Senior Project Scientist II
Summary of Qualifications 
With nearly two decades of field and technical expertise, 
Mr. Simko excels in ecological assessment and regulatory 
compliance for complex environmental projects.
Mr. Simko brings nearly 19 years of specialized experience 
in wetland delineation and site assessment within diverse 
environmental settings. His background includes conducting 
detailed soil morphological evaluations, infiltration and 
percolation testing, and designing and monitoring wetland 
mitigation projects. He has performed both Phase I and II 
Bog Turtle surveys and threatened and endangered species 
assessments. Mr. Simko also has expertise in carbonate 
geology site evaluations, asbestos-containing material 
identification, and underground storage tank (UST) removals and 
investigations. Proficient in ArcGIS 10 and Trimble software, he 
integrates geospatial analysis into his field and reporting work.
As a Senior Project Scientist II at BL Companies, Mr. Simko is 
responsible for conducting wetland, soil, and groundwater 
investigations; managing Bog Turtle Phase I and II surveys; 
completing Phase I Environmental Site Assessments (ESAs); 
supporting remediation projects; monitoring remediation 
systems; and performing engineering and environmental 
compliance inspections.
Relevant Experience 
Peer Review, 4-Lot Subdivision Inland Wetland Commission
Stratford, CT
Served as Lead Soil and Wetland Scientist in the performance 
of a peer review of a proposed 4-lot subdivision application 
submission to the Inland Wetland Commission of Stratford, CT. 
The peer review required a site visit to verify previous wetland 
delineations and assistance with the technical review of the 
submission. Upon completion of review, findings were presented 
in-person to the Stratford Inland Wetland Commission. 
HIGHLIGHTS
YEARS IN THE INDUSTRY
19
EXPERTISE
Wetland Delineation & 
Mitigation
Endangered Species & Habitat 
Surveys
PROJECT ROLE
Environmental Resources & 
Permitting
EDUCATION
Bachelor of Science in 
Environmental Resource 
Management, The 
Pennsylvania State University, 
2005
Master of Science in Biology, 
Bloomsburg University of 
Pennsylvania, 2015
REGISTRATIONS
Certified Professional Soil 
Scientist (CPSS), 2012, #36359
Professional Wetland Scientist 
(PWS), 2012, #2284
Qualified Hydrologic 
Professional In-Training (QHP-
IT), 2024

Page 112

BL Companies  
Sagan Simko
CPSS, PWS
Connecticut Department of Transportation 
State Project No. 108-189 – Moosup Valley 
State Park Trail
Plainfield to Sterling, CT
Served as Senior Project Scientist to 
investigate the presence or absence of 
vernal pools along the Moosup Valley State 
Park Trial. Vernal pools were identified utilizing 
available mapping, aerial photography and field 
investigation. Evidence of obligate amphibian 
species presence and breeding was noted 
in the field via inspection beyond visual and 
audial, including trapping and dip-netting. 
Metro North Milvon Substation – West River 
Substation Vernal Pool Assessment
Milford to New Haven, CT
Served as Senior Project Scientist to 
investigate the presence or absence of vernal 
pools along a portion of the commuter train 
route. Any vernal pool areas were noted and 
recorded with GPS coordinates to submeter 
accuracy. Vernal pools were identified utilizing 
available mapping, aerial photography and field 
investigation. Evidence of obligate amphibian 
species presence and breeding was noted in 
the field via visual and audial inspection.
Avangrid – Wetland Delineations and Vernal 
Pool Investigation Within Metro North Railroad 
Corridor
Westport to New Haven, CT
Served as lead Soil and Wetland Scientist and 
Biologist in the performance of survey work 
for wetlands and vernal pool areas along the 
railroad corridor between Westport and New 
Haven, CT. 
Southeast Bristol Business Park - Lot 3, Lot 9, 
Lot 10
Bristol, CT
Serving as Senior Project Scientist, conducted 
a wetland delineation survey for Lot 3, 
Lot 9, and Lot 10 of the Southeast Bristol 
Business Park in August of 2021. Following field 
delineation efforts, a wetland delineation 
report was created to give details regarding 
the field work findings. Additionally, a field site 
visit meeting with the City of Bristol’s Inland 
Wetlands and Watercourses Commission 
(IWWC) was performed to present wetland 
delineation findings to the Commission for their 
review and subsequent approval. Following 
the IWWC site meeting and agreement with 
the wetlands and watercourses delineation 
work, the City of Bristol’s official IWWC 
wetland mapping was updated from previous 
delineation work to reflect BL Companies’ more 
inclusive and comprehensive field findings and 
geographical positioning system (GPS) data 
collection. 
Consultant Liaison Engineering Services for 
the State and Federal Local Bridge Program, 
Connecticut Department of Transportation
Statewide, CT
Served as Senior Project Scientist for several 
bridge rehabilitation and replacement projects 
for CTDOT across the state. Responsibilities 
included performing wetland delineations, 
function and values assessments, and bat 
habitat assessments at each bridge location 
where natural resources were identified as 
being within the proximity of proposed work. 
Additional responsibilities included attaining 
environmental permitting for the CTDEEP and 
U.S. ACOE, identifying invasive species, and 
coordination for listed species.  

Page 113

BL Companies  
Joy Kloss
LEP, CHMM
Senior Project Manager
Summary of Qualifications 
Ms. Kloss is a Senior Project Manager at BL Companies with 
over 20 years of experience in environmental consulting, 
specializing in site investigations, remediation, regulatory 
compliance, and environmental permitting. 
Ms. Kloss has successfully managed complex environmental 
projects and has extensive experience preparing Phase I/II/
III Environmental Site Assessment (ESA) reports, Groundwater 
Compliance Reports, Remedial Action Plans, and various 
environmental permits. Her work also includes developing 
Stormwater Pollution Prevention Plans (SWPPP), Spill Prevention, 
Control, and Countermeasure (SPCC) Plans, and Health and 
Safety Plans (HASPs), ensuring compliance with environmental 
regulations at both state and federal levels.
With a strong background in field operations, Ms. Kloss has 
supervised soil boring advancements, groundwater monitoring 
well installations, soil vapor point placements, and environmental 
sampling of soil, groundwater, stormwater, sediment, and 
air. She has also led underground storage tank closures, soil 
excavations, and emergency spill response efforts. As a 
Senior Project Manager at BL Companies, she is responsible 
for planning and executing environmental investigations and 
remediation, developing soil and groundwater management 
procedures, and ensuring regulatory compliance for a diverse 
range of projects. Her leadership and technical expertise 
contribute to the successful execution of environmentally 
responsible and regulatory-compliant solutions.
Relevant Experience 
Stormwater Permitting Compliance
Bristol, CT
Served as Senior Project Manager providing compliance services 
for City of Bristol. Project responsibilities included preparation 
of annual reports in accordance with the General Permit for 
the Discharge of Stormwater from Small Municipal Separate 
Storm Sewer Systems. She also supported the city during an 
Environmental Protection Agency (EPA) Request for Information 
Pursuant to Section 308 of Clean Water Act by preparing the 
EPA response letter, providing outfall sampling consulting and 
HIGHLIGHTS
YEARS IN THE INDUSTRY
20
EXPERTISE
Environmental Investigations 
Management
Environmental Site 
Investigation Reports
Project Management
PROJECT ROLE
Environmental Services
EDUCATION
Bachelor of Science, 
Environmental Science, Hobart 
and William Smith Colleges, 
2001
REGISTRATIONS
Licensed Environmental 
Professional: Connecticut No. 
589
Certified Hazardous Materials 
Manager (CHMM), 2013, No. 
16360
PROFESSIONAL MEMBERSHIPS
Environmental Professionals 
Organization of Connecticut

Page 114

BL Companies  
Joy Kloss
LEP, CHMM
training, developing a stormwater sampling plan, and 
providing general MS4 support.
Harbor Brook Flood Control, Utility Bridge & Linear 
Trail Project, Hanover Pond to Baldwin
Meriden, CT
Served as Environmental Project Manager to assess 
project activities in relation to environmental 
conditions within the project limits and for the 
completion of Task 310 – Plans, Specifications, 
and Estimates for incorporation into the project 
contract bid documents.  Plans were prepared to 
identify soil, sediment, and groundwater AOECs and 
Waste Stockpile Areas (WSAs) within the project 
limits, based on previously Task 210 – Subsurface 
Site Investigations. Ms. Kloss was in charge of 
the development of specifications for the proper 
handling and disposal of soil, sediment, and 
groundwater, WSA construction, solidification, as well 
as health and safety. In addition, an estimate was 
prepared for all environmental compliance items.
Fox Street Streetscape Improvements. Pedestrian 
Bridge Over Ash Creek & Multi-Use Trail Along Ash 
Creek
Bridgeport, CT
Served as Environmental Project Manager to assess 
project activities in relation to environmental 
conditions within the project limits and environmental 
engineered control on the adjacent Fairfield Metro 
Center property. After review of previous site 
investigations, Task 310 – Plans, Specifications, and 
Estimates were completed for incorporation into 
the project contract bid documents.  Plans were 
prepared to identify soil, sediment, hazardous, and 
groundwater AOECs and Waste Stockpile Areas 
(WSAs) within the project limits. Specifications were 
developed for health and safety, proper handling, 
management, and disposal of controlled materials, 
WSA construction, solidification, and engineered 
control liner modifications. In addition, an estimate 
was prepared for all environmental compliance items.
Helene Grant Head Start School
New Haven, CT
Served as Senior Environmental Scientist providing 
environmental consulting services in support 
of the complete demolition and reconstruction 
of the school. Project responsibilities included 
completion of Phase I and Combined Phase II & III 
ESAs and a hazardous building material survey and 
preparation of a Remedial Action Plan, PCB Building 
Materials Abatement Plan, and contract plans 
and specifications pertaining to site remediation 
(contaminated soil / fill material), abatement of 
hazardous building materials, and sub-slab radon 
mitigation system.
Connecticut River Access, Multipurpose Trail, Main 
Street and South River Street
Enfield, CT
Served as Environmental Project Manager for 
the completion of a Task 210 – Subsurface Site 
Investigation associated with a proposed trail on 
behalf of the Town of Enfield. The project consisted 
of the construction of a multipurpose path and 
associated landscaping.  The project included the 
construction of a precast concrete pedestrian 
bridge crossing Freshwater Brook that will provide 
access to the existing Asnuntuck Road underpass 
at the Amtrak right-of-way (ROW). Asnuntuck Road 
will be closed to vehicular traffic to accommodate 
bicycle and pedestrian traffic through the railroad 
underpass. The multipurpose path will proceed 
northward along South River Street and then turn 
westerly along Main Street to a viewing point on the 
east shoreline of the Connecticut River. The Task 
210 included the advancement of three soil borings 
using a Geoprobe direct push rig, advancement of 
eight soil borings using a hand auger, and laboratory 
analysis of eleven soil samples. Based on the data, 
preliminary AOECs were identified. An archeological 
study was planned within the AOEC; therefore, 
Ms. Kloss reviewed their HASP for compliance with 
applicable regulations prior to intrusive activities.

Page 115

BL Companies  
Christopher Critelli
PE
Project Manager II
Summary of Qualifications 
Chris leverages 13 years of industry experience to enhance 
operational processes and analyze renewable energy 
technologies. At BL Companies, he expertly manages Energy 
Projects, focusing on renewable natural gas and energy 
efficiency designs for clients.
With 13 years of dedicated experience in the renewable energy, 
wastewater, and construction industries, Chris brings a wealth 
of expertise to BL Companies. His specialization lies in optimizing 
operational processes, precisely sizing equipment, and serving 
as a technical lead for in-depth technology analysis. As a 
Project Manager II, Chris is instrumental in delivering insightful 
oversight for Energy Projects, developing innovative designs for 
renewable natural gas and driving energy efficiency solutions for 
our clients.
Relevant Experience 
Elmwood Pump Station
Cheshire, CT
Lead Engineer designing upgrades at a municipal pump station, 
including a new aeration mixing system, variable frequency 
drives for pumps, channel grinders, a bypass system, and 
upgraded controls.
Clinton and Wrentham Wastewater Treatment Plants – 
Operational Monitoring
Clinton, CT and Wrentham, MA
Performed operational monitoring at two wastewater treatment 
facilities encountering performance issues. Chris conducted site 
visits, identified equipment and process deficiencies, analyzed 
plant data to identify pinch points, designed upgrades, and 
continued monitoring facility operations to ensure compliance.
Port Chester Wastewater Treatment Plant – Primary Settling 
Tank Rehabilitation and Outfall Chamber Redesign
Port Chester, NY
Project Manager improving the primary settling tanks, outfall 
chamber, and disinfection system. Chris developed an 
immediate flow redirection solution following a major pipe failure, 
calculated effluent pipe sizing, coordinated on support design, 
HIGHLIGHTS
YEARS IN THE INDUSTRY
13
EXPERTISE
Renewable Energy
Wastewater 
PROJECT ROLE
Sewer Engineering
EDUCATION
Bachelor of Science in 
Chemical Engineering, 
Manhattan College, 2012 
Master of Science in Chemical 
Engineering, Manhattan 
College, 2013
REGISTRATIONS
Professional Engineer: CT 
(2023), WI (2025)
PROFESSIONAL MEMBERSHIPS
New York Water Environmental 
Association

Page 116

BL Companies  
Christopher Critelli
PE
redesigned the outfall chamber, and designed 
chemical feed pumps and hypochlorite dosing.
Hunts Point Wastewater Treatment Plant – 
Membrane Gas Holder Design and Anaerobic 
Digestion Study
Hunts Point, NY
Project Manager and Lead Engineer designing a 
membrane gas holder and ancillary equipment 
to store excess digester gas. Chris analyzed 
facility energy consumption and calculated gas 
production for existing mesophilic digesters 
and planned thermophilic digesters. He 
developed the local and remote control system 
and integrated it into the existing SCADA 
system.
Bedford Hills Wastewater Treatment Plant – 
Preliminary and Secondary Treatment Design
Bedford, NY
Multi-disciplinary Project Manager responsible 
for upgrading the facility’s entire treatment 
process. Chris led primary system rehabilitation 
and biological nutrient removal improvements, 
created a hydraulic profile, sized equalization 
tanks, designed sludge and scum collector 
systems, microscreens, vortex grit chambers, 
channel grinders, and grit collection systems. 
He performed secondary treatment feasibility 
analysis and selected a Rotating Biological 
Contactor. He also developed local and remote 
controls for all equipment.
Mamaroneck Wastewater Treatment Plant 
– Biological Nutrient Removal and Aeration 
Blowers Study
Mamaroneck, NY
Designed upgrades to improve BNR 
performance. Chris designed new aeration 
blowers, piping, and controls; optimized blower 
system operation; and developed alternatives 
for blower size, flow patterns, and aeration 
diffuser grid layout based on loading scenarios.
Wards Island Wastewater Treatment 
Plant – Primary and Secondary Treatment 
Improvements and Operational Analysis
Wards Island, NY
Project Engineer providing operational 
monitoring and developing design alternatives 
to improve primary and secondary treatment 
processes and meet Ten State Standards. 
Chris evaluated flow rates, suspended solids 
removal, thickener performance, digester 
conditions, surface overflow rates, and 
detention time. He developed Excel models for 
electrical, fuel oil, and chemical use, biosolids 
removal, greenhouse gas emissions, and 
prepared sustainability and waste generation 
reports.
Great Neck and Belgrave Wastewater 
Treatment Plants – Operational Monitoring
Long Island, NY
Project Engineer performing statistical analysis 
of flow, BOD, nitrogen, solids, and contaminant 
concentrations. Conducted site walkthroughs 
to observe operations, inspect equipment, 
resolve baseline data issues, and identify areas 
for process improvement.
Peekskill Wastewater Treatment Plant – 
Aeration and Heating Upgrades
Peekskill, NY
Assistant Project Manager and Lead Engineer 
evaluating blower and aeration systems and 
upgrading the heating system. Chris increased 
blower discharge and suction piping, replaced 
silencers, modified controls, designed a 
temporary blower system, sized new air 
lines, specified valves, identified structural 
improvements, and sized fuel oil tanks for 
emergency boiler loads.

Page 117

BL Companies  
Jesse E. Vose
PE
Senior Project Manager
Summary of Qualifications 
Jesse brings over 26 years of expertise in the design, 
analysis, and specification of mechanical systems across a 
diverse range of sectors, including healthcare, education, 
commercial, cultural, residential, retail, and industrial 
projects.
As a Senior Project Manager at BL Companies, he leads 
multidisciplinary engineering teams in mechanical, electrical, 
plumbing, and fire protection to ensure projects meet or 
exceed client expectations and deadlines. Committed to 
seamless project execution, Jesse emphasizes collaboration 
and coordination among architects, clients, building owners, 
end users, consultants, contractors, and regulatory officials. His 
leadership and strategic approach drive efficient, high-quality 
designs that align with project goals and industry standards.
Relevant Experience 
Scofield Magnet Middle School
Stamford, CT 
MEP project manager for a $2.5 million packaged rooftop 
air-handling unit and building management system (BMS) 
replacement project at a 142,000 square foot middle school.  
Design services were completed in 2025. 
Turn of River Middle School
Stamford, CT 
MEP project manager for a $1.3 million boiler and domestic hot 
water heater replacement project consisting of a completely 
new boiler plant with condensing boilers at a 125,000 square foot 
middle school.  Design services were completed in 2023.
Stamford Board of Education
Stamford, CT 
MEP project manager for building management system (BMS) 
and security system upgrades at 18 schools and Board of 
Education facilities.  Scope of work included connecting 
numerous pieces of MEP equipment and various sensors to both 
the BMS and security systems, in order to issue remote alarms 
upon detection of potential problems.  Design services were 
completed in 2023.  
HIGHLIGHTS
YEARS IN THE INDUSTRY
26
EXPERTISE
Mechanical Engineering
Project Management
PROJECT ROLE
Mechanical Engineering
EDUCATION
Bachelor of Science in 
Mechanical Engineering, 
Rensselaer Polytechnic 
Institute 
REGISTRATIONS
Professional Engineer: CA, CO, 
CT, FL, IL, IN, MA, MI, MN, NH, 
NY, NC, OH, OR, PA, RI, WA
PROFESSIONAL MEMBERSHIPS
American Society of Heating, 
Refrigerating, and Air-
Conditioning Engineers

Page 118

BL Companies  
Jesse E. Vose
PE
Stamford Courthouse
Stamford, CT
Served as MEP Project Manager and Engineer of 
Record for a study and investigation, followed 
by a $3.6 million design to replace the 800-ton 
chilled water plant at the 8-story Stamford 
Courthouse complex. The assessment portion 
of this project involved a comparison of chiller 
options to replace the existing air-cooled 
chillers with remote evaporators.  The design 
portion included new air-cooled chillers, pumps, 
heat exchangers, hydronic components, piping, 
and controls. Design services were completed 
in 2025. 
Polson Middle School
Madison, CT
Overall project manager, MEP project manager, 
and Engineer of Record for a $27 million 
renovation of a 152,000 square foot middle 
school.  Mechanical, electrical, plumbing, fire 
protection, architectural, and structural design 
services associated with new HVAC systems, 
electrical power upgrades, and an auditorium 
renovation.  New systems included rooftop 
air-handling units, packaged dedicated outside 
air systems (DOAS), variable refrigerant flow 
(VRF) systems, building management system 
(BMS) upgrades throughout the facility, 
structural modifications to support mechanical 
equipment, electrical service, full building 
generator and related equipment, lighting, and 
ceilings.  Along with the new electrical service, 
the school’s electrical distribution system was 
upgraded with new switchgear and panels.  The 
auditorium renovation included new seating, 
theatrical and general lighting, audio visual 
systems, flooring, and HVAC.  Design services 
were completed in 2025. 
Fairfield Woods Middle School
Fairfield, CT
Overall project manager, MEP project manager, 
and Engineer of Record for a $16.1 million 
renovation of a 177,000 square foot middle 
school.  Mechanical, electrical, plumbing, fire 
protection, architectural, structural, and civil 
design services associated with new HVAC 
systems to serve 80,000 square feet of the 
school.  New systems included packaged 
rooftop air-handling units, packaged dedicated 
outside air systems (DOAS), variable refrigerant 
flow (VRF) systems, building management 
system (BMS) upgrades throughout the facility, 
structural modifications to support mechanical 
equipment, electrical service, lighting, ceilings, 
and security vestibules.  Design services were 
completed in 2025.  
Tomlinson Middle School
Fairfield, CT
Overall project manager, MEP project manager, 
and Engineer of Record for a $4.7 million 
renovation of a 167,000 square foot middle 
school.  Mechanical, electrical, plumbing, fire 
protection, architectural, and structural design 
services associated with new HVAC systems 
to serve 17,000 square feet of the school.  
New systems included packaged rooftop 
air-handling units, building management 
system (BMS) upgrades, lighting, ceilings, and 
structural modifications to support mechanical 
equipment.  Design services were completed in 
2025.  Firm of Record: BL Companies.  

Page 119

BL Companies  
Dennis Burton
PE, PMP
Principal Engineer
Summary of Qualifications 
Dennis Burton brings over 25 years of distinguished 
experience in architectural design and engineering, shaping 
the built environment with his expertise. 
His extensive portfolio spans a diverse range of projects, 
including high-rise buildings, sports venues, cultural institutions, 
commercial developments, luxury residences, hotels, educational 
facilities (K-12 and higher education), laboratories, and large-
scale master planning across the United States, Europe, the 
Caribbean, and Asia.
As a Principal Engineer at BL Companies, Mr. Burton plays a 
pivotal role in overseeing electrical power, lighting, and fire alarm 
system design, while also providing critical support to HVAC and 
P/FP engineering teams. His responsibilities extend to proposal 
and specification writing, client interviews, construction 
administration, and the leadership of engineering teams, 
ensuring the highest standards of innovation, efficiency, and 
technical excellence..
Relevant Experience 
New Louis Armstrong Tennis Stadium USTA
Queens, NY
Served as MEP Project Manager and Lead Electrical Engineer 
for MEP/FP and Sports Lighting Design for the new 14,000-seat 
tennis stadium at the USTA Billie Jean King National Tennis 
Center, one of the venues of the US Open. Project marked the 
first design of a naturally ventilated closed roof stadium. Mr. 
Burton was active on site in preconstruction meetings and 
throughout construction. Mr. Burton also designed the electrical 
systems for the temporary stadium, which facilitated the 2017 
US Open season and facilitated numerous owners requested 
change for retail and technical power up to opening day. 
Florida Atlantic University Football Stadium Sports Lighting
Boca Raton, FL
Served as Project Manager and Lead Electrical Engineer for 
lighting replacement to HD quality for the 29,000-seat stadium. 
Design included baseline photometrics, design and bid leveling 
with client. Design services were completed in 2018.
HIGHLIGHTS
YEARS IN THE INDUSTRY
25
EXPERTISE
Electrical Engineering
Project Management
PROJECT ROLE
Electrical Engineering
EDUCATION
Bachelor of Science in 
Electrical Engineering, 
University of South Florida
Master of Business 
Administration, Lynn University
REGISTRATIONS
Professional Engineer: AL, AZ, 
AR, CA, CT, DC, FL, HI, KS, MD, 
MA, MI, MO, NE, NJ, NM, NY, NC, 
ND, OR, RI, SC, UT, WA
PROFESSIONAL MEMBERSHIPS
Project Management 
Professional (PMP) 
Certificaiton

Page 120

BL Companies  
Dennis Burton
PE, PMP 
Fairfield Woods Middle School
Fairfield, CT
Served as Electrical Engineer for a $7.3 million 
renovation of a 177,000 square foot middle school.  
Mechanical design services associated with new 
HVAC systems to serve 80,000 square feet of 
the school.  New systems included packaged 
rooftop air-handling units, packaged dedicated 
outside air systems (DOAS), variable refrigerant 
flow (VRF) systems, building management system 
(BMS) upgrades throughout the facility, structural 
modifications to support mechanical equipment, 
new electrical service, new lighting, and new 
ceilings. 
Osborn Hill Elementary School
Fairfield, CT
Served as Electrical Engineer for a $6.0 million 
renovation of a 55,000 square foot elementary 
school.  Mechanical design services associated 
with new HVAC systems to serve 32,000 square 
feet of the school.  
Daniel Hand High School Theatre Lighting
Madison, CT
Served as the MEP Manager for the Daniel Hand 
High School Theatrical Lighting System Upgrade 
project, delivering a modern, energy-efficient 
lighting system that met the program’s needs 
and the allocated budget. The project involved 
complete replacement of the existing conventional 
lighting system, which needed modernization, 
to support the school’s theatrical programs. BL 
Companies designed a digital DMX LED moving 
color mixing spotlight system. The new system 
includes a network lighting control console, 
updated emergency controls, Fire Alarm interface 
and structural support assessments and features 
such as specialized Gobos.  
Polson Middle School
Madison, CT
Served as Electrical Engineer for a $27 million 
renovation of a 152,000 square foot middle school.  
Mechanical, electrical, plumbing, fire protection, 
architectural, and structural design services 
associated with new HVAC systems, electrical 
power upgrades, and an auditorium renovation.  
New systems included rooftop air-handling units, 
packaged dedicated outside air systems (DOAS), 
variable refrigerant flow (VRF) systems, building 
management system (BMS) upgrades throughout 
the facility, structural modifications to support 
mechanical equipment, electrical service, full 
building generator and related equipment, lighting, 
and ceilings.  Along with the new electrical service, 
the school’s electrical distribution system was 
upgraded with new switchgear and panels.  The 
auditorium renovation included new seating, 
theatrical and general lighting, audio visual 
systems, flooring, and HVAC.  
Rhode Island Public Transit Authority, 
Pawtucket-Central Fall Passenger Facility
Pawtucket, RI
Serving as Electrical Engineer for the design of a 
5,000 SF passenger facility for the Pawtucket-
Central Falls transit center.  The facility will contain 
waiting, ticketing, restrooms, and services for 
drivers.  Responsibilities include development of 
the program, conceptual design, public outreach, 
and coordination of disciplines.  In addition, 
responsibilities will include oversight of the 
completion of the construction documents and 
construction administration.
University of Rhode Island – Green Hall and Quad 
Lighting Upgrades
Kingston, RI
Serves as Principal Electrical Engineer and 
Engineer-of-Record for the design of exterior 
lighting improvements around the area south of 
Green Hall and the area around the Quadrangle, 
Ranger Hall and Quinn Hall. 

Page 121

SECTION IV 
Project Understanding

Page 122

BL Companies
Project Understanding and Approach
BL Companies understands that the Town of Granby is seeking a responsive, experienced 
engineering partner capable of delivering both specific capital improvement projects and a 
broad range of on-call municipal engineering services over the next five years. 
Through our successful relationships with municipalities throughout Connecticut, we have 
developed a proven project delivery approach centered on responsiveness, technical excellence, 
proactive communication, and flexibility which is a function of our employee owner culture. Our 
objective is to serve as an extension of Town staff, providing reliable expertise and scalable 
resources that can quickly adapt to the Town’s evolving needs.
A defining strength of BL Companies is our ability to provide nearly all required services in-
house. Our multidisciplinary team includes licensed engineers, landscape architects, surveyors, 
environmental scientists, architects, planners, construction professionals, and permitting 
specialists who routinely collaborate on municipal infrastructure projects. This integrated structure 
eliminates unnecessary handoffs, improves communication, enhances quality control, and allows 
projects to move efficiently from planning through design and into construction.
Program Management and Project Delivery
Overall administration and management of this contract will be led by Joshua Wheeler, PLA, 
who will serve as the Town’s primary point of contact. Josh has extensive experience managing 
municipal capital improvement projects including roadway and pedestrian enhancements, trails, 
parks, athletic facilities, streetscapes, and community development initiatives. As Program 
Manager, he will coordinate all task orders, oversee project schedules and budgets, facilitate 
communication among stakeholders, and ensure that each assignment receives the appropriate 
technical resources.
Josh’s experience with municipal, state, and federally funded projects provides him with a strong 
understanding of project development requirements, permitting processes, funding compliance, 
and stakeholder coordination. His role will be to ensure seamless project delivery while maintaining 
responsiveness, accountability, and consistency throughout the duration of the contract.
For each assignment, BL Companies will implement a task-based delivery model that establishes 
a clear scope, schedule, budget, and communication framework. Upon receipt of a Town request, 
our team will:
• Meet with Town staff to define project goals and objectives.
• Review available data and identify project constraints and opportunities.
• Develop a detailed scope of services, schedule, and fee proposal.
• Assign a discipline specific project manager and supporting technical team.
• Maintain ongoing communication and progress reporting throughout execution.
Our goal is to provide the Town with a single point of accountability while leveraging the expertise 
of our full multidisciplinary team.

Page 123

BL Companies
SURVEYING AND MAPPING
Surveying and mapping services will be led by Don Smith, 
PLS, who brings more than 29 years of experience managing 
survey operations throughout Connecticut. Don and his 
team support roadway, trail, bridge, utility, and municipal 
infrastructure projects by providing accurate existing 
conditions data and mapping necessary for project 
development.
Representative experience includes:
• Bloomfield Greenway Multi-Use Trail
• Silas Deane Streetscape Project, Rocky Hill
• Harbor Brook Channel Improvements and Multi-Use Trail, 
Meriden
Our survey team routinely prepares topographic surveys, boundary surveys, easement maps, 
land acquisition maps, and ROW plans in accordance with Connecticut standards and CTDOT 
requirements while utilizing the newest technology, equipment and computer software. A few of 
our specialties include:
• High Definition 3D Laser Scanning
• Unmanned Aerial Vehicle (UAV) Mapping
• Subsurface Utility Engineering (SUE)
TRANSPORTATION AND ROADWAY DESIGN
Roadway and multimodal transportation design services will be led by Steven Fraysier, PE, 
who brings significant experience in municipal and CTDOT transportation projects throughout 
Connecticut.
Steven’s experience includes roadway improvements, sidewalks, trails, multimodal corridors, 
pedestrian enhancements, bridge-related transportation projects, and Complete Streets 
initiatives. Relevant projects include:
• Beeline Trail (State Project No. 88-198)
• South Street Roadway & Pedestrian Improvements
• Hopmeadow Pedestrian Improvements
• Stratfield Pedestrian Improvements
Steven will draw upon his extensive experience with municipal and CTDOT-funded projects to guide 
roadway and multimodal assignments. Throughout his career, he has worked on projects funded 
through LOTCIP, Community Connectivity, Urban Act, RAISE, and State Local Bridge programs, 
among others, providing a thorough understanding of project development requirements, funding 
compliance, and applicable design standards.

Page 124

BL Companies
Our approach incorporates Complete Streets principles that safely accommodate pedestrians, 
bicyclists, motorists, transit users, and people of all abilities while respecting environmental, 
community, and right-of-way constraints.
Representative pedestrian and corridor projects include South Street in Coventry and Bradley 
Road in Madison, where BL Companies successfully integrated roadway reconstruction, pedestrian 
facilities, stakeholder coordination, and public outreach to create safer community connections.
STRUCTURAL ENGINEERING AND BRIDGES
Bridge engineering services will be led by Brian Reilly, PE, who leads BL Companies’ municipally 
focused bridge design team.
Their team has completed bridge and culvert 
rehabilitation, preservation, and replacement 
projects in more than twenty Connecticut 
communities and routinely provides:
• Bridge inspections and condition 
assessments
• Structure type studies
• Rehabilitation and replacement design
• Hydraulic coordination
• Utility coordination
• Rights-of-way support
• Construction administration and inspection
Our bridge team emphasizes practical, cost-effective, and constructible solutions while 
maintaining sensitivity to community context, environmental resources, and historic character. 
Their experience includes projects funded through municipal, state, and federal transportation 
programs, ensuring familiarity with all phases of project delivery.
HYDRAULICS, DRAINAGE, AND PERMITTING
Hydraulic, drainage, and permitting services will be led by David Cicia, PE, a Principal Engineer with 
more than 26 years of experience in hydrologic and hydraulic engineering.
David has extensive experience with:
• Stormwater management
• Floodplain analysis
• FEMA mapping
• Stream and culvert design
• Scour evaluations

Page 125

BL Companies
• Storm sewer systems
• Environmental permitting
Recent projects include:
• Marion Avenue Bridge Replacement, Southington
• Pepper Street Culvert Replacement, Monroe
As a certified CTDOT Hydraulics and Drainage Engineer, David brings extensive experience 
coordinating with CTDEEP, ACOE, municipal inland wetlands agencies, and other permitting 
authorities.
Our team initiates environmental permitting efforts early in project development to identify 
requirements, reduce risk, and maintain project schedules.
CIVIL ENGINEERING
Civil engineering services will be led by Robert 
Roles, PE, who has over 30 years of experience 
providing municipal engineering solutions 
throughout Connecticut.
Robert’s expertise includes:
• Site development
• Utility coordination
• Stormwater management
• Roadway design
• Hydraulic analysis
• Pump station design
• Sanitary sewer design
• Environmental permitting
His broad project experience enables BL Companies to provide practical and sustainable solutions 
for municipal infrastructure, site improvements, recreational facilities, and utility projects.
TRAFFIC ENGINEERING
Traffic engineering services will be led by Michael Dion, PE, PTOE, RSP1 and Michael Shepley, PE, 
PTOE, who collectively possess more than 35 years of traffic engineering experience.
Their services include:
• Traffic signal design
• Traffic studies

Page 126

BL Companies
• ADA and PROWAG
• Signing / pavement marking
• RRFB design
• Pedestrian crossings
• Traffic management plans
• Transportation permitting
As leaders of BL Companies’ CTDOT Traffic and Safety CLE contract, they maintain strong 
relationships with CTDOT staff and routinely coordinate transportation projects throughout 
Connecticut.
ENVIRONMENTAL SERVICES
Environmental services will be led by Joy Kloss, LEP, CHMM, 
supported by Scott Johnson, who leads BL Companies’ Hazardous 
Building Materials Assessment Team.
Joy brings more than 20 years of environmental consulting 
experience and specializes in:
• Phase I, II, and III Environmental Site Assessments
• Remediation planning
• Environmental permitting
• Groundwater compliance
• SWPPP development
• Regulatory coordination
Scott brings more than 21 years of experience involving:
• Hazardous building materials investigations
• Asbestos and lead assessments
• Abatement design
• Demolition planning
• Regulatory compliance
Together, they provide comprehensive environmental services that support project feasibility, 
permitting, redevelopment opportunities, and regulatory compliance.
FACILITY DESIGN AND MEP ENGINEERING
Facility design services will be led by Christen Robbins, AIA LEED AP and Christopher Albino, PE, 
whom have more than 52 years combined of architectural and structural engineering experience.
BL Companies offers fully integrated:

Page 127

BL Companies
• Architectural services
• Structural engineering
• Mechanical engineering
• Electrical engineering
• Plumbing engineering
Representative projects include:
• Connecticut Service Plazas
• Enfield Town Garage Truck Wash Facility
• Municipal facility improvements
• Building additions and rehabilitations
Our facility team focuses on developing durable, energy-efficient, maintainable solutions that align 
with the Town’s operational and budgetary goals.
LANDSCAPE ARCHITECTURE
Landscape architecture services will be led by Dominick Celtruda, PLA, ASLA.
Dominick specializes in creating functional, attractive public spaces that enhance both user 
experience and community identity. His project experience includes park improvements, 
streetscapes, trails, and pedestrian-oriented environments throughout Connecticut.
Our landscape architecture team evaluates:
• Site aesthetics
• Pedestrian circulation
• Accessibility
• Wayfinding
• Planting design
• Site furnishings
• Lighting
• Gathering spaces
Whenever possible, we incorporate sustainable and native landscape solutions that reduce 
maintenance requirements and provide year-round visual interest.
PUBLIC ENGAGEMENT AND STAKEHOLDER COORDINATION
Meaningful public engagement is critical to successful municipal project delivery. Under the 
leadership of Joshua Wheeler, PLA, BL Companies develops project-specific outreach strategies 
that encourage participation while maintaining project momentum.

Page 128

BL Companies
Our public engagement efforts typically include:
• Stakeholder meetings
• Public information sessions
• Public workshops
• Board and commission presentations
• Agency coordination meetings
• Documentation of comments and action items
Our team understands how to balance public feedback, technical requirements, regulatory 
constraints, and project budgets to help build consensus and support project success.
CONSTRUCTION ADMINISTRATION AND OBSERVATION
BL Companies provides comprehensive construction administration and inspection services 
through its experienced construction engineering and inspection group.
These efforts will be led by Matthew Stark, NICET III, Senior Construction Inspector, with support 
from Peter Schirmer, PE.
Together they provide:
• Resident engineering
• Construction observation
• Documentation and reports
• Contractor coordination
• Shop drawing review
• Change order evaluation
• Project closeout services
Their experience spans both municipal and CTDOT-funded transportation and infrastructure 
projects and includes familiarity with the documentation requirements associated with local, 
state, and federal funding programs.
OPINIONS OF PROBABLE CONSTRUCTION COST
Accurate project budgeting is essential to successful delivery. BL Companies develops Opinions of 
Probable Construction Cost beginning in conceptual design and refines them through final design.
Our estimates utilize:
• CTDOT historical bid data
• Recent municipal bid results
• Current market conditions
• Detailed quantity takeoffs

Page 129

BL Companies
Every estimate undergoes internal QA/QC review to verify quantities, unit prices, and assumptions, 
providing the Town with reliable information for budgeting, grant applications, and capital planning.
SITE INVESTIGATIONS AND TECHNICAL STUDIES
BL Companies routinely performs site investigations and technical assessments that form the 
foundation for cost effective solutions to municipal projects. These services include:
• Utility investigations
• Geotechnical coordination
• Environmental assessments
• Structural evaluations
• Wetland investigations
• Surveying and mapping
• Existing conditions documentation
Our multidisciplinary approach allows findings to be integrated into a single, comprehensive report 
that supports planning, funding, design, and implementation decisions.
PEER REVIEW AND QUALITY ASSURANCE
Quality control is embedded throughout BL Companies’ project delivery process. In addition to 
providing peer review services for municipalities, COGs, and transportation programs throughout 
Connecticut, we maintain a rigorous internal QA/QC program.
Our three-tier review process includes:
• Independent discipline peer review
• Engineer-in-Charge review
• Executive Quality & Risk Review by Michael Fisher, PE
This process ensures technical accuracy, interdisciplinary coordination, constructability, and 
compliance with project requirements before deliverables are submitted.
Project Development Approach for On-Call Capital and Municipal 
Projects
BL Companies will apply a consistent, scalable project delivery methodology across the full range 
of services contemplated under this contract, including transportation improvements, parks and 
recreation facilities, utility infrastructure, site development, drainage improvements, facilities, and 
other municipal capital projects. Our approach is designed to provide the Town with responsive 
service, clear communication, and efficient project execution from initial project conception 
through construction completion.
Each assignment begins with a collaborative kickoff meeting involving Town staff and key 
stakeholders. Through early coordination, our team develops a thorough understanding of project 

Page 130

BL Companies
goals, funding requirements, schedule expectations, operational needs, and potential constraints. 
This upfront planning effort allows us to establish a clear path forward and identify opportunities 
and challenges before significant design resources are committed.
During the Project Initiation phase, BL Companies will respond promptly to the Town’s request, 
conduct site visits and data collection efforts, and work closely with Town staff to define project 
scope, priorities, and success criteria. As part of this effort, our team evaluates existing site 
conditions, utility impacts, environmental constraints, rights-of-way considerations, permitting 
requirements, constructability concerns, schedule drivers, and any funding program requirements 
that may influence project development.
Following project initiation, we move into Evaluation and Concept Development, where feasibility 
assessments and alternatives analyses are performed to identify practical and cost-effective 
solutions. Throughout this phase, we coordinate with Town stakeholders, agencies, utilities, 
and regulatory authorities as necessary while developing preliminary concepts and opinions of 
probable construction cost. This early evaluation process allows potential risks to be identified 
and addressed proactively, minimizing redesign efforts and helping maintain project schedules and 
budgets.
Once a preferred alternative is selected, the project advances into Final Design and Permitting. 
During this stage, our multidisciplinary team prepares construction drawings, technical 
specifications, and supporting documents necessary for project implementation. We coordinate 
closely with utilities, property owners, regulatory agencies, and other stakeholders while obtaining 
any required permits and approvals. Continuous communication ensures that design decisions 
remain aligned with Town goals and stakeholder expectations.
The final phase involves Bidding, Construction Administration, and Project Closeout. BL Companies 
supports the Town throughout the bidding process, including responding to contractor questions, 
reviewing bids, and assisting with contractor selection. During construction, we provide shop 
drawing review, construction observation, field inspections, and coordination with contractors to 
ensure the project is built in accordance with the design intent. Upon completion, we assist with 
project closeout activities, documentation, and final acceptance.
Throughout every phase of project development, communication remains a cornerstone of our 
approach. Regular coordination with Town staff, regulatory agencies, stakeholders, and affected 
property owners allows projects to remain aligned with the Town’s objectives while providing 
the flexibility necessary to address unforeseen challenges and changing priorities. By combining 
proactive planning, technical expertise, and collaborative project management, BL Companies 
consistently delivers successful municipal projects that meet schedule, budget, and quality 
expectations.
Athletic Track and Field Improvements
BL Companies has extensive experience planning, designing, and overseeing athletic facility 
improvements for municipalities and educational institutions throughout Connecticut. Our 
approach focuses on understanding how facilities will function for athletes, coaches, spectators, 
maintenance personnel, and the community.

Page 131

BL Companies
For athletic facility projects, we evaluate:
• Site functionality and circulation
• Access and parking requirements
• ADA accessibility
• Grading / stormwater management
• Utility infrastructure
• Athletic governing body requirements
• Spectator amenities and safety considerations
• Long-term maintenance requirements
Approach to Anticipated Town Projects
BL Companies understands that the Town’s anticipated projects represent diverse infrastructure, 
recreational, and utility needs that require multidisciplinary expertise and thoughtful project 
execution. Our team has successfully delivered similar projects throughout Connecticut and is 
well-positioned to provide planning, design, permitting, bidding, and construction administration 
services tailored to the Town’s goals and budget.
Salmon Brook Park – Bathroom and Pickleball Court Improvements
BL Companies recognizes that recreational facilities must balance functionality, accessibility, 
durability, maintenance requirements, and user experience. Drawing upon our extensive experience 
with park improvements, athletic facilities, trails, and public spaces, our team will work closely 
with the Town to evaluate existing conditions, identify the optimal location and configuration of 
proposed amenities, and develop improvements that complement the character of Salmon Brook 
Park.
For the proposed restroom facility, our team will evaluate site access, utility availability, 
operational requirements, maintenance considerations, and long-term durability. Our in-house civil, 
structural, architectural, landscape architecture, and MEP professionals will collaborate to develop 
a facility that is attractive, functional, ADA-compliant, energy-efficient, and easy to maintain. 
Utility investigations will confirm available water, sewer, electrical, and communication services, 
while our site design team will address grading, drainage, pedestrian circulation, and emergency 
access requirements.
For the pickleball courts, our team will evaluate site topography, existing drainage patterns, 
solar orientation, accessibility requirements, parking and pedestrian connections, court layout, 
fencing, lighting, stormwater management, and spectator accommodations. We understand the 
importance of proper grading and drainage in maintaining court performance and minimizing long-
term maintenance costs. Our landscape architects will also evaluate opportunities for buffering, 
seating areas, shade structures, wayfinding, and aesthetic enhancements that improve the overall 
user experience.
Throughout project development, BL Companies will coordinate with Town staff, user groups, and 

Page 132

BL Companies
stakeholders to ensure the final design reflects the community’s recreational goals while providing 
a sustainable and cost-effective long-term facility.
Sewer Pump Maintenance and Rehabilitation Projects
BL Companies has extensive experience providing condition assessments, rehabilitation design, 
asset management planning, and construction administration services for municipal utility 
infrastructure. These services will be supported by our utility and facility engineering professionals, 
including personnel experienced in pump station evaluations, mechanical systems, structural 
assessments, electrical upgrades, and regulatory compliance.
Our approach begins with a comprehensive evaluation of the existing facility, including pumps, 
controls, motors, electrical systems, telemetry equipment, emergency backup systems, wet wells, 
force mains, valve structures, and associated site infrastructure. Through field investigations 
and coordination with Town operational staff, we will identify maintenance concerns, operational 
deficiencies, capacity limitations, equipment nearing the end of its useful life, and opportunities 
for improving system reliability.
Following the assessment phase, our team will develop recommendations that balance operational 
needs, available funding, risk management, and long-term asset preservation. Potential 
improvements may include equipment replacement, control system upgrades, emergency power 
improvements, structural repairs, site drainage enhancements, security upgrades, and resiliency 
measures designed to improve performance during severe weather events and power outages.
During implementation, BL Companies will prepare construction documents, assist with permitting 
and procurement, provide bidding support, and perform construction administration services to 
ensure improvements are completed in accordance with project objectives. Our goal is to help 
the Town maximize the service life of its utility assets while maintaining regulatory compliance, 
minimizing operational disruptions, and reducing long-term maintenance costs.
General Municipal Engineering Tasks
BL Companies routinely serves as an extension of municipal staff by providing responsive 
engineering support across a broad spectrum of public infrastructure projects. Through numerous 
on-call contracts throughout Connecticut, we have assisted municipalities with everything from 
small technical studies and emergency evaluations to complex, grant-funded capital improvement 
projects.
Our team can quickly mobilize to support roadway improvements, sidewalk and trail projects, 
drainage investigations, bridge and culvert evaluations, traffic studies, site development 
projects, utility infrastructure improvements, facility upgrades, environmental permitting, grant 
applications, capital planning efforts, and peer reviews. Because we maintain comprehensive in-
house capabilities, we are able to efficiently assemble the appropriate team for each assignment 
without requiring multiple outside consultants.
For transportation-related projects, our engineers can provide corridor studies, roadway 
rehabilitation design, Complete Streets improvements, ADA and PROWAG compliance evaluations, 
traffic analysis, pedestrian enhancements, and grant-supported transportation improvements. 

Page 133

BL Companies
For drainage and utility projects, our team can investigate flooding concerns, evaluate aging 
infrastructure, perform hydraulic analyses, develop stormwater management solutions, and 
prepare permitting documents.
For parks, schools, and municipal facilities, we provide planning, site design, architectural and 
engineering services, cost estimating, public outreach, and construction support. Additionally, 
our environmental professionals can support site investigations, wetland evaluations, hazardous 
building materials assessments, permitting efforts, and regulatory coordination.
Regardless of project size or complexity, BL Companies employs the same disciplined approach of 
early coordination, thorough investigation, stakeholder engagement, proactive risk management, 
and strong quality control. This allows us to provide practical, cost-effective solutions that help 
the Town advance its capital improvement goals while maximizing available funding and maintaining 
project schedules.
Commitment to the Town of Granby
BL Companies’ combination of experienced leadership, deep technical expertise, municipal project 
experience, and comprehensive in-house capabilities uniquely positions us to serve as the Town 
of Granby’s trusted engineering partner. Whether supporting a single task order or a multi-year 
capital improvement initiative, our team is committed to providing responsive service, innovative 
solutions, rigorous quality control, and successful project outcomes.
We look forward to partnering with the Town to advance its infrastructure, recreational, 
transportation, and community development goals throughout the duration of this contract.

Page 134

SECTION V 
Relevant Experience

Page 135

BL Companies 
Walsh Intermediate School 
Softball Field Improvements
Branford, CT
The Town of Branford sought to enhance the outdoor areas 
at Francis Walsh Intermediate School, focusing on the middle 
school’s multi-use athletic fields. This project aimed to revitalize 
the school’s outdoor spaces for physical education, athletics, 
recess, and environmental enrichment.
To support these goals, BL Companies provided athletic field design 
and construction administration services. The project renovated 
an existing underperforming natural grass softball field. It provided 
regrading of the outfield area for positive drainage, a new irrigation 
system, new perimeter fence, athletic field lighting and a playscape. 
The project also provided universal accessibility to enrich the 
educational and recreational experiences for school and community 
use.
PROJECT FACTS
KEY SERVICES 
Landscape Architecture
Civil Engineering
Electrical Engineering
Irrigation Design
Plumbing Design
Land Surveying

Page 136

BL Companies 
Brainard Park Softball Field
Enfield, CT
The Town of Enfield sought to upgrade the softball field at 
Brainard Park for recreational and potential high school use. 
BL Companies was chosen to design the improvements, which 
included dugout canopies, spectator seating, sports lighting, a 
new scoreboard, and ADA-compliant pathways.
To meet the town’s goals, BL Companies developed a technical 
design with modified grading, high-performance infield and sand-
based root-zone mixes, a sod outfield, and extensive drainage 
systems. The design also included irrigation, bleachers, dugouts, 
bullpens, and scoreboards. The improvements ensure the field can 
meet CIAC standards if needed, while staying within budget and 
supporting the town’s long-term maintenance capabilities.
PROJECT FACTS
KEY SERVICES
Sports and Recreation 
Facility Design
Landscape Architecture
Geotechnical and 
Structural Engineering
Site Engineering
Civil Engineering
Stormwater Engineering
Permitting
Electrical Engineering
Land Surveying

Page 137

BL Companies 
Eldredge Park Improvements
East Greenwich, RI
Eldredge Park was renovated in line with East Greenwich’s 
recreation master plan, transforming the existing softball field 
into a flexible space that accommodates flag football and other 
sports to better serve the community’s needs.
The Town of East Greenwich selected BL Companies to transform 
Eldredge Park, enhancing two basketball courts, redesigning 
athletic fields, and adding new amenities such as dugout canopies, 
expanded seating, sports lighting, scoreboards, fencing, and team 
areas. A new pavilion, perimeter walking path, and ADA-compliant 
pathways now provide accessible options for both active and 
passive recreation. The revitalized park balances community needs, 
offers optimal viewing for spectators, and was designed to align 
with the town’s budget and maintenance goals.
PROJECT FACTS
KEY SERVICES
Sports and Recreation 
Facility Design
Landscape Architecture
Civil Engineering
Stormwater Engineering
Electrical Engineering

Page 138

BL Companies 
NCAA Softball Field and 
Athletic Training Complex
Willimantic, CT
BL Companies conducted a feasibility study for a new softball 
field, which led to the funding of the project.
An initial study guided the construction of a new parking garage on 
the existing softball field at the main campus, navigating challenges 
like wetlands and a stream crossing.  BL Companies prepared 
construction documents for relocating the Eastern Connecticut 
State University softball field, including features such as high-
performance playing surfaces, seating for 1,000 spectators, player 
amenities, and ADA-compliant access.  They managed site planning, 
design, environmental compliance, and oversaw construction, 
obtaining necessary approvals for this university expansion project.
KEY SERVICES
Architecture
Civil Engineering
Environmental Sciences
Land Surveying
Transportation 
Engineering
Landscape Architecture
Planning

Page 139

BL Companies  
Fred Wolfe Park Master Plan
Orange, CT
The Town of Orange, Connecticut engaged BL Companies to 
develop a comprehensive master plan for Fred Wolfe Park, a 
68-acre public recreation space.  
The Town sought to update its 2013 master plan to better address 
evolving community needs, safety concerns, and infrastructure 
limitations. BL worked closely with Town representatives and 
residents to establish a clear vision and roadmap for future park 
development—one that promotes accessibility, balances the 
built and natural environments, and enhances safety, access, 
and infrastructure.The resulting plan reconfigured existing fields 
and introduced new athletic areas, proposed sport courts for 
pickleball, basketball, and tennis, and incorporated new restrooms, 
pavilions, improved parking and pedestrian circulation, cultural 
and educational nodes, enhanced playgrounds, maintenance and 
storage facilities, and a new entrance.
PROJECT FACTS
KEY SERVICES
Landscape Architecture
Civil Engineering
Survey
Traffic Engineering
Environmental
Master Planning

Page 140

BL Companies 
Fairfield Parks & Recreation 
Master Plan
Fairfield, CT
BL Companies, in partnership with Horsley Witten Group, 
prepared the Town-wide parks and recreation master plan for 
Fairfield, CT.
The master plan aimed to enhance facilities for both current 
needs and future growth. BL Companies assessed eleven buildings, 
identifying deficiencies and required repairs, and compiled existing 
data. The project included evaluating underused structures, 
planning for emergency access, environmental protection, cost 
estimation, and creating a plan for facility improvements. It also 
addressed multi-generational use, ADA accessibility, aesthetics, and 
provided funding and implementation strategies.
PROJECT FACTS
KEY SERVICES 
Architecture 
Landscape Architecture 
Civil Engineering 
Athletic Facility Design 
GIS

Page 141

BL Companies 
Comprehensive Community 
Services Master Plan
East Greenwich, RI
The Town of East Greenwich, Rhode Island retained BL 
Companies to prepare a town-wide parks and recreation master 
plan. 
The project created a comprehensive master plan for recreational 
and conservation areas, including parks and sports complexes, 
through analysis of existing data, needs assessments, and 
optimization of site layouts. The plan enhanced facilities, ensured 
environmental protection, improved aesthetics, and addressed ADA 
accessibility. It included feasibility studies, cost estimates, and 
funding recommendations informed by public outreach and surveys, 
and documented recommendations, costs, and implementation 
strategies.
PROJECT FACTS
KEY SERVICES
Athletic Facility Design
Landscape Architecture
Civil Engineering
GIS

Page 142

BL Companies  
Walsh Intermediate School 
Athletic Field Improvements
Branford, CT
The Town of Branford sought to enhance the outdoor areas 
at Francis Walsh Intermediate School, focusing on the middle 
school’s multi-use athletic fields and softball field. This project 
aimed to revitalize the school’s outdoor spaces for physical 
education, athletics, recess, and environmental enrichment.
To support these goals, BL Companies provided athletic field design 
and construction administration services. The project introduced 
universal accessibility from the school and adjacent parking areas, 
removed outdated outdoor elements, and added new features to 
enrich both educational and recreational experiences for the school 
and the broader community.
PROJECT FACTS
KEY SERVICES
Landscape Architecture
Civil Engineering
Electrical Engineering
Irrigation Design
Plumbing Design
Land Surveying

Page 143

BL Companies  
On-Call Architecture and 
Engineering Services 
Hartford, CT
For over 12 years, BL Companies has been proud to support 
the City of Hartford with responsive, on-call architectural, 
engineering, and environmental services tailored to the City’s 
evolving needs. 
The City of Hartford uses BL Companies for complex projects 
requiring specialized expertise. Services include civil, structural, 
geotechnical, traffic, and architectural work, as well as contract 
support. Completed projects include City Hall HVAC evaluation, 
Cleveland Avenue traffic signal replacement, and New Park Avenue 
Bridge replacement.
PROJECT FACTS
KEY SERVICES
Architecture
Civil Engineering
MEP Engineering
Structural Engineering
Transportation 
Engineering
Landscape Architecture
Planning

Page 144

BL Companies  
On-Call Multi-Discipline 
Engineering & Survey Services
Meriden, CT
Under an on-call contract, BL Companies is supporting the City 
of Meriden with responsive, multidisciplinary engineering and 
land surveying services tailored to meet the City’s evolving 
needs.
BL Companies handles design and construction for various City 
infrastructure projects, including specialized and general engineering 
across multiple disciplines. Services include planning, site work, 
surveying, civil, transportation, structural, electrical, mechanical, 
geotechnical, hydrological, and environmental engineering. Current 
on-call projects include sewer bridge design at Leslie Drive, channel 
improvements from Bradley/Coe Avenue Bridges to Cooper Street 
Bridge, and a feasibility study for relocating Meriden Soccer Fields.
PROJECT FACTS
KEY SERVICES
Bridge / Structural 
Engineering
Civil Engineering
Transportation 
Engineering
Landscape Architecture
Land Surveying
Environmental Services

Page 145

BL Companies  
On-Call Architectural and 
Engineering Services
New Britian, CT
The City of New Britain selected BL Companies to 
provide architectural, civil, transportation, and 
structural engineering support through an on-call 
contract, helping advance key infrastructure projects 
across the community.
BL Companies’ on-call contract with New Britain provides 
architectural, civil, transportation, and structural 
engineering services. Projects include surveying John 
Downey Drive, inspecting Shultz Pond Brook Bridge, 
improving Hartford Road sidewalks, designing Ten Acre 
Road Bridge, and supporting various city buildings and 
infrastructure.
PROJECT FACTS
KEY SERVICES
Architecture
Civil Engineering
Environmental Sciences
Land Surveying
Landscape Architecture
MEP Engineering
Planning
Structural Engineering
Subsurface Utility 
Engineering
Transportation 
Engineering

Page 146

BL Companies 
On-Call Engineering Services
Naugatuck, CT
The Borough of Naugatuck has selected BL Companies for 
an on-call contract to support their ongoing projects and 
community initiatives.
This contract provides civil, transportation, and structural 
engineering support for infrastructure projects in Naugatuck. 
BL Companies offers services in design, construction, and 
consulting, either as the prime vendor or a resource for other 
consultants. Tasks include civil and traffic engineering, planning, 
surveying, zoning, geotechnical services, and construction 
documentation. We also perform evaluations for building 
renovation, adaptive reuse, or demolition. Completed or near-
completion projects include bridge inspections for Parks & 
Recreation, and cost opinions for various projects and grants.
KEY SERVICES
Architecture
Civil Engineering
Environmental Sciences
Land Surveying
Landscape Architecture
MEP Engineering
Planning
Structural Engineering
Subsurface Utility 
Engineering
Transportation 
Engineering
Grant/Funding 
opportunity support.

Page 147

BL Companies 
On Call Engineering
City of Springfield, MA
BL Companies is proud to support the City of Springfield 
through a multi-year contract, providing responsive 
and reliable On-Call Engineering services tailored to the 
City’s needs.
The contract includes a wide range of multi-discipline 
services in the completion of studies, field investigations 
and reports, preparation of plans and specifications, and 
contract administration.  Specific discipline services include: 
Civil / site engineering, Highway and street engineering, 
Drainage, stormwater & flood control systems, Traffic 
engineering, Environmental permitting, Bridge engineering, 
Pavement management, Land Surveying & GIS, Building 
inspection & assessments, Electrical engineering, and 
Mechanical engineering.
PROJECT FACTS
KEY SERVICES
Land Surveying
Civil Engineering
Environmental
Transportation 
Engineering

Page 148

BL Companies  
Tennis Court Facility, UCONN
Storrs, CT
The University of Connecticut (UCONN) has a new athletic 
building along Avalonia Way to support the needs of the UConn 
Tennis Team and enhance the existing Discovery Drive tennis 
complex.  
The facility provides essential utilities and dedicated spaces 
including locker rooms, restrooms, office space, and support areas 
that improve team operations and overall user experience. To help 
UCONN achieve these goals, BL Companies provided comprehensive 
architecture, MEP, and engineering services. The project included 
the installation of a precast concrete modular building adjacent 
to the existing Tennis Court facility. BL conducted site surveying, 
civil engineering, landscape design, grading, architectural planning, 
structural engineering as needed, and MEP engineering to deliver a 
functional, well-coordinated building that integrates seamlessly into 
the athletic campus.
KEY SERVICES
Architecture
Mechanical
Electrical & Plumbing
Civil Engineering
Land Surveying
Construction 
Administration

Page 149

BL Companies  
Memorial Park Concession 
Building
Southington, CT
To enhance the functionality and user experience at Veterans 
Memorial Park, BL Companies provided comprehensive design services 
for the renovation of the concession stand, restrooms, team meeting 
room, and storage building for the Town of Southington.
The project involved code improvements, restroom renovations, relocating 
electrical services, and updates to the roof and exterior, including stone 
and cement fiber siding. Additional work included exterior painting, parking, 
dumpster pad, and interior updates like emergency lighting and exit signs. 
The site was regraded to address stormwater drainage issues, with a new 
subsurface storm drain detention system designed based on groundwater 
monitoring to manage drainage around the building.
PROJECT FACTS
KEY SERVICES
Architecture
MEP Engineering
Civil Engineering

Page 150

BL Companies 
Recreational Park Pool 
Building
Southington, CT
For the Town of Southington, BL Companies delivered 
comprehensive design solutions to enhance the functionality 
and experience of the pool building at Recreation Park, including 
upgraded restrooms, showers, and a lifeguard station.
The project scope included code improvements, renovation of 
the restrooms & showers, relocation of the existing electrical 
services, new sheltered lifeguard station, new control room, and 
new roof which enclosed the existing structures as well as provided 
supplemental shaded areas for pool guests. Interior improvements 
(emergency lighting, exit signs, painting) were included in the scope. 
The interior layout was also redesigned for better circulation and to 
create a single entry point for guests entering the pool area. 
PROJECT FACTS
KEY SERVICES
Architecture
MEP Engineering
Structural Engineering

Page 151

BL Companies 
Calendar House Senior Center
Southington, CT
To help the Town of Southington create a welcoming, functional space 
for its senior community, BL Companies provided comprehensive 
design and construction administration services for the new 
Southington Senior Center.
The building was constructed on the site of the previous facility, which 
remained in operation. The space and needs program for the facility 
was derived from data provided by Center administrators, staff, user 
members, instructors, volunteers, and members of the general public 
who attended the open house forums held during the research portion of 
the study.  Further investigations of space requirements for the building 
were performed through site visits and observations of building usage 
throughout the survey period. The new facility is approximately 22,000 SF
in area and includes fitness, recreation, social, administrative and support 
areas for the many activities and services offered by the Center.
PROJECT FACTS
KEY SERVICES
Architecture
MEP Engineering
Structural Engineering
Civil Engineering
Environmental Sciences

Page 152

BL Companies 
East Hartford High School 
Tennis Courts
East Hartford, CT
BL Companies provided Improvements to four Town-owned 
tennis courts at the East Hartford High School complex.  These 
improvements were required to accommodate the expanding school 
athletic programs for the East Hartford public school system.  
The initial design and due diligence included identifying geotechnical and 
environmental issues and providing design recommendations.  In addition 
to the design services, BL provided a topographic survey of the site.
The final design included the design of four new tennis courts adjacent 
to the four existing tennis courts.  The existing tennis courts were 
improved with a new surface. Site illumination and fencing was also 
upgraded. 
PROJECT FACTS
KEY SERVICES
Civil Engineering
Landscape Architecture
Land Surveying
Environmental Sciences
Geotechnical 
Engineering

Page 153

BL Companies  
Portsmouth High School 
Tennis Courts
Portsmouth, NH
Portsmouth High School expanded its athletic facilities to 
support growing programs and better serve the community. 
With only four Town-owned tennis courts, the school added six 
new courts to meet the rising demand.
BL Companies was contracted to provide design and construction 
services, beginning with a detailed analysis of geotechnical 
and environmental conditions and site-specific design 
recommendations. The project delivered six new tennis courts with 
shade structures, spectator areas, and wetland plantings, while 
reusing and upgrading existing lighting and fencing to improve 
functionality and accessibility.
PROJECT FACTS
KEY SERVICES
Civil Engineering
Landscape Architecture
Electrical Engineering
Construction 
Administration

Page 154

BL Companies 
Elmwood Pump Station
Cheshire, CT
The Town of Cheshire is planning a comprehensive upgrade of 
the Elmwood Pump Station, its largest wastewater pumping 
facility, to modernize aging infrastructure and ensure long-term 
reliability. 
Originally constructed in the early 1970s and last comprehensively 
upgraded in 1996, the station serves average daily flows of 1.2 MGD 
with peak capacities up to 7.0 MGD and plays a critical role in the 
town’s wastewater system. Building on interim pump replacements 
completed in 2024, the project will address significant architectural, 
mechanical, electrical, and structural needs throughout the facility. 
PROJECT FACTS
KEY SERVICES 
Architecture 
Environmental Services
MEP Engineering 
Structural Engineering
1

Page 155

BL Companies 
Stratford Utility Relocation
Stratford, CT
The Town of Stratford engaged BL Companies to perform 
an analysis of existing sewer and stormwater utilities along 
Sniffens Lane and Main Street in support of the redevelopment 
of the more than 75-acre site formerly occupied by the 
Stratford Army Engine Plant.
BL Companies evaluated existing infrastructure and developed 
schematic design alternatives for a new sewer main to serve the 
future development. The resulting design proposes a relocated 
gravity and force sewer system consisting of 10 new structures and 
more than 2,800 linear feet of SDR-35 PVC piping. The proposed 
system also includes construction of a new pump station with a wet 
well exceeding 30 feet in depth designed to meet flood resiliency 
criteria. Construction documents are currently being developed 
as the municipality and development team continue to evaluate 
redevelopment options for the site. Construction is anticipated 
within the next two years. 
PROJECT FACTS
KEY SERVICES
Civil Engineering
Environmental Sciences
Land Surveying
Landscape Architecture
MEP Engineering
Planning
Structural Engineering
Subsurface Utility 
Engineering
Transportation 
Engineering
Architecture

Page 156

BL Companies 
Sewer Force Main
Winchester/Barkhamsted, CT
The Town of Winchester Water Pollution Control Authority and 
the Town of Barkhamsted engaged BL Companies to provide 
engineering services to connect two low-pressure sewer force 
mains from Barkhamsted to an existing gravity sewer system in 
the Town of Winchester. 
BL coordinated several meetings with the Engineering Departments, 
Departments of Public Works, and political representatives from 
both towns to address stakeholder concerns and ensure alignment 
between the municipalities. Because the system was privately 
funded and a contractor had already been selected, BL conducted 
a site visit with the contractor prior to design to coordinate a 
readily constructible solution, identify potential obstacles, and 
determine appropriate construction approaches to ensure the 
needs of both municipalities were met.
The resulting design included twin low-pressure force mains 
totaling approximately 3,500 linear feet, serving both commercial 
and residential customers, with the ability to expand service to 
additional users in the future. Based on the success of this project, 
BL Companies was subsequently awarded a follow-up project to 
design an additional 1,300 linear feet of force main to serve an over-
55 apartment complex located northeast of Mallory Brook Plaza. 
PROJECT FACTS
KEY SERVICES
Civil Engineering

Page 157

SECTION VI 
References

Page 158

BL Companies
References
CLIENT NAME CLIENT CONTACT CONTRACT
City of New Britain, CT Mark Moriarty, PE
Director of Public Works
27 Main Street               
New Britain, CT 06051
860.826.3374
mark.moriarty@newbritainct.gov
On-Call Architectural and 
Engineering Services, City of New 
Britain, CT
City of Meriden, CT John Lawlor, PE
Director of Public Works
142 East Main Street                  
Meriden, CT 06450
203.630.4022
jlawlor@meridenct.gov
On-Call Engineering & Survey 
Services, City of Meriden, CT
Town of Branford, CT Alex Palluzi, Jr., Former Parks
and Recreation Director and
Member of the Branford Public
Building Commission
Town of Branford
185 Damascus Road
Branford, CT 06405
203.637.6378
apjr55@gmail.com
Walsh Intermediate
School Athletic Field
Improvements, Branford,
CT
Town of Orange, CT John Carangelo, Selectman
Town of Orange
617 Orange Center Road
Orange, CT 06477
203.397.1808
jjudgejjc@hotmail.com
Fred Wolfe Park Master
Plan, Orange, CT

Page 159

SECTION VII
Services Expected from the 
Town

Page 160

BL Companies
What the Respondent will Expect the Town 
to Supply
The nature and scope of services expected from the Town of Granby in support of the On-
Call Engineering Services contract include:
· Coordination meetings with appropriate Town representatives who can clarify project / 
task objectives, define and confirm scope, and establish detailed project requirements
· Access to properties, roadways, parks, including buildings, as warranted for a specific 
project
· Police protection when working within the travelway portion of a Town or State right-of-
way, not including police protection that may be required during the construction phase of 
a project
· Access to and reprographic images of Town maps, sanitary, storm, and roadway plan 
and profile drawings, CAD files when available, any as-builts or record documents and or 
previous conceptual plans if performed if available
· Access to historical data, and reports, including financial budgets, traffic studies, 
drainage reports and sewer studies, environmental and geotechnical reports, and property 
assessment reports
· Written comments for plan review of design drawings and specifications to facilitate a 
paper trail of correspondence
· Use of Town Hall facilities for any Public Information Meetings that may be required.

Page 161

SECTION VIII 
Cost Proposal

Page 162

Page 7 of 7 
APPE
NDIX A 
Cost Proposal 
Name
 of Engineering Firm: ___________________________________________________ 
Services Needed 
On-Call 
Engineering and Related Services 
Ple
ase indicate your firm’s hourly fees over the five-year period of the contract 
Billing
 Category Hourly Billing Rate 
Pro
ject Manager ________________ 
Chief Engineer ________________ 
Engineer ________________ 
Technician Support ________________ 
Clerical/Researcher ________________ 
Other  ________________ 
Othe
r Expenses (if applicable): 
Identify any other categories and costs required to provide Engineering and On-Call 
services that are not included above:  
________________________________________________________________________ 
________________________________________________________________________ 
________________________________________________________________________ 
BL Companies Connecticut, Inc.
Please see attached hourly rates by billing category.
Please see the attached reimbursables.

Page 163

BL Companies
Hourly Rates
CLASSIFICATION HOURLY RATE
ENGINEERING & LANDSCAPE ARCHITECTURE
Principal Engineer $240-$300
Principal Landscape Architect 220-250 
Senior Project Manager 220-280
Project Manager 180-250
Senior Engineer 175-250
Project Engineer 150-195
Staff Engineer 125-150
Senior Mechanical Gas Designer 180-210
Senior Landscape Architect / Specialist 170-220
Project Landscape Architect / Specialist 140-175
Staff Landscape Architect / Specialist 110-140
Principal Construction Inspector 180-270
Senior Construction Inspector 170-250
Construction Inspector 140-190
Senior Project Coordinator 130-170
Project Coordinator 120-150
Senior GIS Specialist 140-195
GIS Specialist 120-160
GIS Technician 95-130

Page 164

BL Companies
Hourly Rates
ENGINEERING & LANDSCAPE ARCHITECTURE (cont’d)
Senior CADD Designer 130-160
CADD Designer 110-140
Technician 90-110
Senior Administrative Assistant 100-110
Administrative Assistant 75-100
ARCHITECTURE
Principal Architect $240-$300
Senior Project Manager 220-280
Project Manager 180-250
Senior Architect 190-250
Project Architect 150-200
BIM Manager 150-190
Senior Architectural Designer 180-230
Architectural Designer 150-200
Designer 125-150
Senior Construction Manager 220-280
Senior Construction Administrator 170-220
Construction Administrator 150-200
Program Analyst 120-150
Project Coordinator 120-150
Construction Coordinator 100-150
Administrative Assistant 75-100

Page 165

BL Companies
Hourly Rates
SURVEY & SUBSURFACE UTILITY ENGINEERING
Principal Land Surveyor $240-$300
Senior Land Surveyor 220-260
Senior Project Manager 220-260
Project Manager 150-220
Senior Survey Technician 145-195
Survey Technician 105-155
Subsurface Utility Specialist 130-175
Crew Chief / 1-Man Robotic Crew 140-190
Instrument Operator 100-125
Rod Person / Technician 90-115
Project Coordinator 120-150
Administrative Assistant 75-100
ENVIRONMENTAL
Principal Environmental Scientist $240-$300
Senior Project Manager 220-280
Project Manager 180-250
Senior Environmental Scientist 180-250
Senior Project Scientist 150-210
Project Scientist 120-195
Staff Scientist 110-150
Senior Environmental Inspector 140-190

Page 166

BL Companies
ENVIRONMENTAL (cont’d)
Environmental Inspector 105-145
Environmental Quality Control Coordinator 120-190
Senior GIS Specialist 140-195
GIS Specialist 120-160
GIS Technician 95-130
Field Technician 90-110
Senior Administrative Assistant 100-110
Administrative Assistant 75-100
The Hourly Billing Rates shall remain in effect for work done during the calendar year. Consultant 
typically adjusts its Hourly Billing Rates on January 1.
BL Companies will submit to the Town rate increase requests in future years if applicable or 
required and mutually negotiate acceptable rates.
Hourly Rates

Page 167

BL Companies
Reimbursable Expenses
CLASSIFICATION RATE ($)
FEDEX VARIES
MILEAGE .725 (IRS STANDARD RATE)
B&W COPY 11x17 .127
B&W COPY 8.5x11 .065
COLOR COPY 11x17 .743
COLOR COPY 8.5x11 .435
COLOR PLOT PER SQ FT 1.551
COLOR PLOT WITH FOAM BOARD 7.651
COVERS 11x17 3.574
COVERS 8.5x11 1.787
B&W PLOT PER SQ FT .147

Page 168

SECTION IX 
Contract Exceptions

Page 169

BL Companies
Contract Exceptions
Thank you for the opportunity to provide term exceptions. We have reviewed the RFP and 
take exception to the terms of the indemnification clause, as specifically described below. 
To address these concerns, we note several targeted revisions in the attached sample, 
which we believe would align the terms with industry standards for design professional firms 
and the requirements of our professional liability coverage. 
If selected by the Town, we request the opportunity to discuss these concerns and negotiate 
mutually agreeable contract terms.
The revisions include:
• Removal of the duty to defend, as it is broader than the duty to indemnify and could 
improperly obligate us to cover attorneys’ fees without any determination of fault. 
• Narrowing the scope of indemnified parties to avoid extending obligations to unknown third 
parties, such as the Town’s independent contractors, with whom we have no contractual 
relationship. 
• Revised indemnification language to apply only to the extent damages are caused by our 
negligence, consistent with the coverage provided under our Professional Liability insurance. 
• Relatedly, we removed the term “sole” in reference to the Town’s negligence to reflect the 
possibility of comparative or contributory negligence, ensuring each party bears responsibility 
proportionate to its role in causing a loss.
• Finally, with respect to insurance requirements, while we can meet the stated coverage limits, 
please note that our Professional Liability policy covers negligent acts, errors, or omissions 
and includes a $150,000 deductible.

Page 170

Page 5 of 7 
 
5. Professional Liability. One Million Dollars ($ 1,000,000.00) coverage per occurrence for each 
site or project for all damages arising out of bodily injury, personal injury, and property damage.  
 
6. Deductibles and Self-Insured Retentions: Any deductible or self-insured retention must be 
declared to and approved by the Town of Granby.  All deductibles or self-insured retentions are the 
sole responsibility of the awarded Respondent to pay and/or to indemnify. 
 
7. Errors and Omissions Insurance. The awarded Respondent shall provide and maintain Errors 
and Omissions Insurance with minimum limits of $2,000,000 per occurrence/annual 
aggregate.  The policy shall not have a deductible greater than $50,000.00.   
 
The Town of Granby shall be named as “Additional Insured.” Coverage is to be provided on a 
primary, noncontributory basis. Waiver of subrogation in favor of the Town of Granby is required 
on all applicable policies, including workers’ compensation. If any policy is written on a “Claims 
Made” basis, the policy must be continually renewed for a minimum of two (2) years from the 
completion date of the Contract. If the policy is replaced and/or the retroactive date is changed, 
then the expiring policy must be endorsed to extend the reporting period for claims for the policy 
in effect during the Contract for two (2) years from the completion date.  
 
Defense, Hold Harmless and Indemnification  
The successful proposer agrees, to the fullest extent permitted by law, to defend, indemnify, and 
hold harmless the Town, its employees, officers, officials, agents, volunteers and independent 
contractors, including any of the foregoing sued as individuals  (collectively, the “Town 
Indemnified Parties”), from and against all proceedings, suits, actions, claims, damages, injuries, 
awards, judgments, losses and expenses, including attorney’s fees, arising out of or relating, 
directly or indirectly, to the successful proposer’s malfeasance, misconduct, negligence or failure 
to meet its obligations under the RFP or the Contract. The successful proposer’s obligations under 
this section shall not be limited in any way by any limitation on the amount or type of the successful 
proposer’s insurance. Nothing in this section shall obligate the successful proposer to indemnify 
the Town Indemnified Parties against liability for damage arising out of bodily injury to persons 
or damage to property caused by or resulting from  the sole negligence of the Town Indemnified 
Parties. In any and all claims against the Town Indemnified Parties made or brought by any 
employee of the successful proposer, or anyone directly or indirectly employed or contracted with 
by the successful proposer, or anyone for whose acts or omissions the successful proposer is or 
may be liable, the successful proposer’s obligations under this section shall not be limited by any 
limitation on the amount and type of damages, compensation or benefits payable by the successful 
proposer under workers’ compensation acts, disability benefit acts, or other employee benefits 
acts. The successful proposer shall also be required to pay any and all attorney’s fees incurred by 
the Town Indemnified Parties in enforcing any of the successful proposer’s obligations under this 
section, which obligations shall survive the termination or expiration of this RFP and the Contract. 
As a municipal agency of the State of Connecticut, the Town will NOT defend, indemnify, or hold 
harmless the successful proposer.  
 
These insurance requirements are not meant to be construed as a limitation of liability. The parties 
agree that the amounts of insurance under this Agreement do not, in any way, limit the Respondent’s 
liability to the Town of Granby by virtue of this promise to indemnify and hold the Town of Granby 

Page 171

Submitted to:
Mike Walsh
Town Manager
Town of Granby
15 North Granby Rd.
Granby, CT 06035
Submitted by:
Paul Furgal, PE, PTOE 
New England Deputy Regional Manager
Bowman
94 North Elm St., Suite 210
Westfield, MA 01085
413.875.8855 | pfurgal@bowman.com
Town of Granby
Request for Proposals
Professional Engineering Services
July 24, 2026

Page 172

Table of Contents
01 Firm Profile
02 Key Personnel
03 Relevant Experience
04 References
05 Project Approach & Understanding
06 Fee Schedule

Page 173

July 24, 2026
Mike Walsh
Town Manager
Town of Granby
15 North Granby Rd.
Granby, CT 06035
RE: Town of Granby | Request for Proposals for Professional Engineering Services
Dear Mr. Walsh:
Bowman is pleased to submit our proposal to provide Professional Engineering Services to the Town of Granby. 
We appreciate the opportunity to support the Town as a trusted engineering partner for the planning, design and 
construction of municipal infrastructure and recreational improvements over the next five years. 
 
Bowman offers a multidisciplinary team of licensed engineers, landscape architects, surveyors and construction 
professionals with extensive experience delivering municipal engineering services throughout Connecticut and 
New England. Our team has successfully planned, designed and managed a wide range of public projects, including 
athletic field and track improvements, parks and recreation facilities, roadway and pedestrian enhancements, 
utility and drainage infrastructure, and ongoing on-call engineering services for municipalities. We have extensive 
experience working with municipalities similar in size, character and infrastructure needs to the Town of Granby, 
allowing us to provide practical, responsive and cost-effective solutions on a project-by-project basis.
Key staff members Jon Allard and Stephanie MacDonald began their careers in Connecticut, spending their first 
seven years working in Simsbury and Manchester, where they gained extensive experience across a wide range 
of roadway, parks and recreation, site development, state, municipal, and private projects. Stephanie’s experience 
working in Manchester Connecticut included the preparation of technical designs for a variety of site development, 
stormwater management, and roadway projects, including utility design, traffic management, specification and bid 
documents, and permitting coordination. As a landscape architect and project manager, Jon designed and worked 
on a variety of projects while working in Simsbury and Manchester offices. His experience includes municipal parks 
and recreation projects, athletic fields and court design, streetscape and roadway design, housing and subdivision 
development, University and school facilities and various planning projects. This early work provided both Jon 
and Stephanie with a strong foundation in multidisciplinary project delivery and fostered a deep understanding of 
Connecticut’s local conditions and state and municipal standards. 
 
We understand that the Town is seeking a responsive consultant capable of supporting both the replacement of 
the high school/middle school athletic track and adjacent athletic fields, as well as a variety of municipal capital 
improvement projects through a task-order approach. Our team is prepared to provide practical, cost-effective 
engineering solutions while maintaining open communication, meeting project schedules and delivering high-
quality technical services tailored to the Town’s needs. 
 
Bowman’s strength lies in our ability to provide comprehensive in-house services throughout every phase of a 
project, from planning and permitting through design, bidding, construction administration and closeout. We take 
pride in building long-term partnerships with our municipal clients by providing responsive service, experienced 
project management and a collaborative approach that helps communities successfully implement their capital 
improvement programs.
Cover Letter

Page 174

Primary Point of Contact
Paul Furgal, PE, PTOE
New England Deputy Regional Manager
860.602.8700
pfurgal@bowman.com
I will serve as the primary point of contact for the duration of this contract and will coordinate all staffing, task 
assignments, and communications in accordance with the RFQ’s contract management requirements.
We appreciate your consideration of our qualifications and look forward to the opportunity to partner with the Town 
of Granby. Thank you for your time and consideration.
Sincerely,
Paul Furgal, PE, PTOE
New England Deputy Regional Manager

Page 175

E
Firm Profile
01
SECTION 

Page 176

6
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
About Us
Locally, Bowman specializes in delivering innovative engineering, transportation and transit planning, traffic engineering, 
highway and roadway design, landscape architecture, public engagement, and construction services. With more than 2,500 
professionals across 108 offices—nine of which are located in New England—our firm brings 49 years of transportation 
experience, often involving close collaboration with multidisciplinary teams.
Our New England region includes offices in: Windsor, CT; Westfield, Boston, and Taunton, MA; Lincoln, RI; Biddeford, ME; 
Williston, VT; and Etna, NH. As a local firm, we are well-versed in regional conditions and standards, and our proximity to the 
Town of Granby allows us to be on-site promptly when needed. Although the Bowman name is newer to New England, our 
staff continues to provide the same expertise, responsiveness, and commitment to our clients and projects that we delivered 
for many years as McMahon Associates.
Why We’re Different
Our team approaches every project with a strong emphasis on creativity, problem-solving, and collaboration. We work closely 
with our clients to understand their goals and to shape engineering solutions that are functional, sustainable, and tailored 
to community needs. Drawing from the diverse backgrounds of our planning and engineering professionals, we are able to 
address complex challenges while keeping long-term system performance and user experience at the forefront. 
We bring extensive engineering experience delivering practical, innovative, and cost-effective solutions for municipalities 
and public agencies. Our team has successfully completed a wide range of civil engineering projects, including public 
infrastructure improvements, utility systems, parks and recreation facilities, site development, stormwater management, and 
municipal facility improvements. By combining technical expertise with a collaborative approach, we develop designs that 
are resilient, sustainable, and tailored to each community’s needs while supporting long-term functionality.
EXPERIENCE WITH PROVIDING INNOVATIVE SOLUTIONS AND ALTERNATIVES
Bowman’s experience is unique in that we provide services to a wide range of clients, with differing needs, issues, and 
priorities. We work closely with municipalities, regional planning agencies, state DOTs, transit agencies, higher education 
institutions and school districts, and private clients on comprehensive design projects and improvements in both urban and 
rural settings. While each of these clients has individual perspectives towards their needs, Bowman has successfully been able 
to not only address their needs, but to help them see the “bigger picture” and work in a comprehensive manner towards the 
most effective solutions. Bowman has developed safe and efficient projects that improve mobility and create more livable and 
healthy communities. Our diverse staff takes an innovative, forward-thinking, comprehensive approach to all of our projects. 
49
Years in Business
(Combined)
108
Offices Nationwide
2,500
Number of Employees (Approx.)
Firm Profile

Page 177

7
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
As requests for on-call engineering services occasionally arise from emergency situations, Bowman is uniquely positioned 
to respond quickly to the Town’s needs by combining local presence with the resources of a multidisciplinary engineering 
firm. Upon receiving a task assignment, we promptly identify the most qualified staff for the project, establish a clear scope, 
schedule, and project management plan, and mobilize our team to begin work efficiently. Our Westfield Massachusetts office, 
just a short drive up Route 202, is located less than 20 minutes from Granby. This allows our staff to quickly attend meetings, 
conduct field investigations, and respond to unforeseen issues without delay. 
Our multidisciplinary team provides comprehensive civil engineering services for municipalities, with expertise in planning, 
design, and construction of drainage and stormwater systems, water and sewer utilities, roadways, parking facilities, parks, 
public spaces, pedestrian infrastructure, and municipal facilities. Services include engineering assessments, feasibility studies, 
condition evaluations, and conceptual through final design, supported by in-house structural, environmental, geotechnical, 
surveying, landscape architecture, and permitting expertise.
Bowman has extensive experience in stormwater management and resiliency planning, including the evaluation and 
design of drainage systems to address localized flooding, erosion, and aging infrastructure. Our designs incorporate 
green infrastructure and low impact development practices while meeting current CTDEEP Stormwater Quality Manual 
requirements for water quality treatment, groundwater recharge, and runoff volume management. Our senior engineering 
staff also have significant experience with FEMA Hazard Mitigation Grant Program (HMGP) projects, flood mitigation planning, 
and resilient infrastructure improvements that help municipalities prepare for future climate-related challenges.
In addition to engineering design, Bowman serves as a trusted partner throughout project implementation by coordinating 
with agencies such as ConnDOT, CTDEEP, regional utility providers, and local departments, boards, and commissions. 
Whether assisting with a small municipal repair or managing a complex, multi-discipline capital improvement project, our 
team provides proactive communication, technical leadership, and responsive project management to help communities 
successfully achieve their goals.
EXPERIENCE WORKING WITH GOVERNMENT AGENCIES
In addition to working with state departments, Bowman serves local municipalities and planning agencies. As such, we are 
keenly aware of the needs of public sector clients, especially related to sound development growth from the perspective 
of a municipality. Bowman works interactively with clients and project stakeholders and, when appropriate, modifies the 
interactive process to draw out the input, priorities, and ultimate strategies of a group. Bowman has extensive experience in 
managing on-call contracts for municipalities and we will bring that expertise to the Town of Granby to deliver assignments 
on-schedule and on-budget. 
EXPERIENCE PREPARING AND ADMINISTERING GRANT DOCUMENTATION
Bowman brings extensive experience supporting municipalities across New England in securing and managing federal and 
state funding opportunities including RAISE, SS4A, as well as recreational funding opportunities including LWCF, CDBG and 
PARC. We are prepared to provide the Town of Granby with the same level of strategic, hands-on assistance as needed.
Our team helps communities navigate competitive grant programs by identifying eligible projects, developing strong, 
data-driven applications, and assembling the technical materials needed to demonstrate readiness and value. This may 
include preparing concept-level plans, cost estimates, project schedules, Benefit-Cost Analyses, safety assessments, and 
environmental research that align with federal regulations. 
We also assist with coordinating regional partners, public safety departments, elected officials, and community stakeholders 
to build broad support of the application. Once funds are awarded, Bowman can provide post-award services to ensure the 
Town remains in full compliance with federal and state requirements. This includes tracking milestones, preparing required 
reporting, assisting with documentation and reimbursement, and supporting project delivery through design, permitting, 
and construction.

Page 178

E
Key Personnel
02
SECTION 

Page 179

9
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Organizational Chart
Key Resume Included
Contract Manager
Paul Furgal, PE, PTOE
QA/QC Manager
Jason Adams, PE, PTOE
Site Engineering/Stormwater 
Management
Angela Saunders, PE
Stormwater Management - Task Lead
Stephanie MacDonald, PE
Site Engineering/Stormwater 
Management Engineer
Landscape Architecture
Jon Allard, RLA
Landscape Architecture - Task Lead
Paul Simon, RLA
Landscape Architect
Traffic Engineering
Erin Fredette, PE
Traffic Engineering - Task Lead
Matt Taylor, PE
Traffic Engineer
Construction Administration
Antonia Thomas
Construction Administration - Task 
Lead
Deputy Project Manager
Jon Allard, RLA
Roadway/Transportation
Paul Furgal, PE, PTOE
Roadway/Transportation - Task Lead
Matt Taylor, PE
Roadway/Transportation Engineer

Page 180

10
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Paul Furgal is a senior project manager and Westfield office lead who has over 28 
years of experience in transportation engineering services. He specializes in Complete 
Streets, roadway design, utility design, traffic signals, traffic studies, and construction 
administration for public and private clients. His experience includes numerous 
transportation projects under MassDOT, CTDOT and municipal jurisdictions. In recent 
years, Paul has focused on the design development of urban roadways, streetscapes, 
and roundabouts, serving as both a designer and project manager to municipalities 
under the MassWorks funding program. His experience also includes various 
Complete Streets projects that have enhanced pedestrian and bicycle accessibility.
Experience
City of Westfield, Union Street at Springdale Road Intersection Improvements | 
Westfield, MA
Project manager. Responsible for engineering design, traffic analysis and construction 
administration services for Union Street/Springdale Road intersection improvements. 
Responsible for overseeing a team of transportation engineers through the design of 
intersection and roadway improvements as well as preparation of final design plans 
and contract documents. 
City of Westfield, Peer Review for Roots Academy Proposal | Westfield, MA
Project manager. Responsible for a traffic and parking peer review of a proposed 
580-student school in Westfield. Responsible for evaluating a proposed site plan 
and traffic analyses provided in a traffic study prepared for the development. The 
review found that the traffic study was understating trip generation estimates and 
their impact on the site and surrounding roadway network. In addition, site plan 
circulation and parking issues between buses and parked vehicles were identified. 
These issues were documented and relayed to the Planning Board. 
City of Easthampton, Ferry Street Improvements | Easthampton, MA
Project manager. Responsible for overseeing a team of engineers for the design of a 
mini-roundabout, its integration with Manhan Rail Trail crossing, the addition of new 
on-street parking, and accessibility improvements for pedestrians and bicycles as part 
of a funding application submitted to MassWorks. Also responsible for overseeing 
construction administration activities for this roadway infrastructure and Complete 
Streets improvement project.
City of Cambridge, Grand Junction Multi-Use Path | Cambridge, MA
QA/QC designer. Provided design QA/QC for improved connections to other multi-
use paths in the region and for future two-track rail transit service along the Grand 
Junction right-of-way. Our firm is part of a multi-disciplinary team responsible for 
assisting the City of Cambridge to support the city’s goals with regard to active 
transportation, complete streets, Vision Zero, and neighborhood context to develop 
the Grand Junction Multi-Use Path. 
Education
B.S. Civil Engineering, Merrimack 
College, 1998
Registrations
Professional Engineer:  
Massachusetts (#47532)  
Connecticut (#26326)  
New Hampshire (#12197)
Professional Traffic Operations 
Engineer
Associations
Institute of Transportation Engineers, 
Member 
Town of Southampton Planning Board, 
Member
Year Started with Bowman
2017
Year Started Professional 
Experience
1998
Paul Furgal, PE, PTOE
Project Role: Contract Manager; Roadway/Transportation Task Lead

Page 181

11
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Paul Furgal, PE, PTOE
Project Role: Contract Manager; Roadway/Transportation Task Lead
City of Cambridge, Inman Square Intersection Safety Improvements | Cambridge, MA 
QA/QC designer. Responsible for QA/QC review. This project developed multimodal 
safety improvements in alignment with the principles of the Vision Zero Action 
Plan for the City of Cambridge. Design elements included separated bicycle lanes, 
protected intersection treatments, and improved pedestrian facilities; improving and 
simplifying operations for all modes; design of bus stops; provisions for on-street 
parking and loading; and continuing to support the local, residential and business 
communities that define Inman Square.
Granite Street Intersection Improvements | City of Quincy, MA
Bowman was contracted to perform engineering services on this project to 
accommodate complete street improvements at Granite Street and Walter J. Hannon 
Parkway, Granite Street at Thomas E. Burgin Parkway, and Granite Street at Whitwell 
Street. The project included a Road Safety Audit (RSA) for a segment of Thomas E. 
Burgin Parkway, between Walter J. Hannon Parkway and Granite Street. Our firm 
was responsible for evaluating existing and future conditions, traffic projections and 
developed design plans for intersection layout, pavement design and resurfacing, 
drainage and watermain replacement, and construction documents for the proposed 
intersections. 
City of Springfield, West Street Corridor | Springfield, MA
Project manager. Bowman provided design, public engagement, transportation 
planning and engineering services for the West Street and Plainfield Street corridor 
improvements. The project was focused on improving safety, enhancing pedestrian 
travel within the study area and supporting transit services. The project included 
the design of shared-use paths, community gateway enhancements, a landscaped 
median with mid-block crossing and High Intensity Activated Crosswalk (HAWK) 
system as well as safety improvements to pedestrian crossings at the Connecticut 
Riverwalk and Bikeway. 
Town of Walpole, Coney Street Improvements | Walpole, MA
Project manager. Managed the project team for engineering design services for 
roadway and traffic signal improvements to approximately 1,700 feet of Coney 
Street from its intersection with the Walpole Mall Driveway to its intersection with 
Joseph Lane. This project included the design of a new traffic signal system, roadway 
widening, utility relocations and pedestrian crosswalks and signal to enhance the 
safety of pedestrians. 

Page 182

12
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Jason is the Bowman New England Regional Manager and Boston office manager 
with 25 years of experience in traffic engineering and transportation planning for 
government/public sector and commercial/private sector clients. He has worked 
on all phases of traffic assessments, traffic impact studies, and parking assessments 
from initial data collection through final report submission, including existing and 
future forecast analysis, trip generation analysis, capacity analysis, Synchro modeling, 
VISSIM modeling, and other traffic engineering tasks. He has completed peer reviews 
of a wide range of projects throughout Massachusetts and has worked to ensure 
projects fit within their given communities. Jason has experience reviewing and 
improving pedestrian and bicycle accommodations and has a focus on improving 
the safety and operation of all modes of transportation. He also has experience 
completing road safety audits and safety review prompt lists. His work continues 
to involve comprehensive and complex transportation engineering and planning 
projects, while he also has experience in report writing, public presentation, research, 
surveys, proposal preparation, scheduling, and cost estimating. Jason has extensive 
experience in analyzing and understanding project impacts to area roadways and 
intersections and has authored hundreds of technical submissions.
Experience
City of Westfield, Infrastructure Improvements | Westfield, MA 
Project engineer. Responsible for supervising the data collection efforts and 
preparation of the traffic impact study for a new retail center, the Westfield Pavilion 
in the City of Westfield. Other responsibilities included performing capacity 
analyses at 24 study area intersections using the Synchro software and making 
recommendations for a mitigation program that included integrating three new 
traffic signals into a coordinated system, reconfiguring traffic flow patterns on three 
study area roadways, and introducing a new entrance onto the Massachusetts 
Turnpike. 
City of Quincy, Cliveden Street Extension Review | Quincy, MA
Project manager. Responsible for coordinating with the City of Quincy to determine 
appropriate intersection and roadway improvements based on anticipated 
development phasing. Worked with the City to establish potential future impact 
of full build out for key parcels within the study area, including providing capacity 
analysis and overall impact for various uses, including a proposed parking structure. 
As a subconsultant, our firm supported the City of Quincy in the planning of the 
Cliveden Street Extension and the intersection of Cliveden Street with Hancock Street 
as part of ongoing improvements related to the construction of a new connection 
from Thomas E. Burgin Parkway. Our efforts focused on new traffic patterns in the 
vicinity of Cliveden Street and determining new traffic control improvements. 
City of Cambridge, Pearl Street On-Street Parking Study | Cambridge, MA 
QA/QC officer. Responsible for quality control on the report production that 
Education
B.C.E. Civil Engineering, University of 
Delaware, 2000
Registrations
Professional Engineer: 
Massachusetts (#50414)
New Hampshire (#12573)
Connecticut (#30832)
Maine (#12573)
Professional Traffic Operations 
Engineer
Associations
International Council of Shopping 
Centers, Member
Institute of Transportation Engineers, 
Member
Year Started with Bowman
2000
Year Started Professional 
Experience
2000
Jason Adams, PE, PTOE
Project Role: QA/QC Manager

Page 183

13
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Jason Adams, PE, PTOE
Project Role: QA/QC Manager
documented the extents of the survey area, methodology, survey analysis and 
results of the study in tabular and graphic format.. Our firm conducted a parking 
occupancy survey on Pearl Street, and adjacent side streets, in the Cambridgeport 
neighborhood. The survey was conducted during the morning, afternoon and 
overnight periods, over three days, to determine average parking demand and the 
potential to eliminate parking along one side of Pearl Street to facilitate proposed 
bicycle accommodations. 
Inman Square Intersection Safety Improvement Project | Cambridge, MA 
Lead traffic engineer. Led the traffic analysis for the Inman Square Intersection 
Safety Improvements Project. The purpose of the project was to develop multimodal 
safety improvements by providing separated bicycle lanes, protected intersection 
treatments, and improved pedestrian facilities; improving and simplifying operations 
for all modes; design of bus stops; provisions for on-street parking and loading; and 
continuing to support the local, residential and business communities that define 
Inman Square. Led traffic analysis in Synchro and VISSIM to quantify the alternatives 
intersection operations. Documented analysis results and design of best practices in a 
technical memorandum of the alternatives analysis.
Traffic Engineering Services, Various Medical Facilities | Various Locations, MA
Traffic engineer. Completed traffic and parking assessments on a variety of medical 
facilities. Completed parking demand and parking generation studies to understand 
the parking impacts of expanding services and increasing the size of medical 
buildings. Completed trip generation reviews to determine the changes in vehicle 
trips associated with medical projects and assessed the impacts of additional vehicles 
on the surrounding roadway network. Worked with medical facility project teams to 
make sure that appropriate pedestrian, bicycle and emergency vehicle connections 
exist on the site. Is experienced with permitting medical facility projects on the state 
and local level.
City of Cambridge, Pearl Street On-Street Parking Study | Cambridge, MA 
QA/QC officer. Responsible for quality control on the report production that 
documented the extents of the survey area, methodology, survey analysis and 
results of the study in tabular and graphic format.. Our firm conducted a parking 
occupancy survey on Pearl Street, and adjacent side streets, in the Cambridgeport 
neighborhood. The survey was conducted during the morning, afternoon and 
overnight periods, over three days, to determine average parking demand and the 
potential to eliminate parking along one side of Pearl Street to facilitate proposed 
bicycle accommodations. 

Page 184

14
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Jon Allard is a project manager and landscape architect with 20 years of professional 
experience in project management, planning, landscape and site design analysis, 
graphic visualizations and presentations, and construction oversight for various 
project types, including transportation, housing, universities and schools, municipal 
parks, industrial development and private development. Jon started his career 
in Connecticut and is now managing a wide variety of projects throughout New 
England.
Experience
Filley Park Improvements* | Bloomfield, CT
Provided landscape architecture and design services for improvements at Filley 
Park in Bloomfield, Connecticut, focused on enhancing recreation, accessibility, 
and the overall visitor experience while preserving the park’s character. Services 
included conceptual and detailed landscape design, planting plans, grading and 
ADA accessibility, site furnishing and material selection, and coordination with the 
multidisciplinary design team. Improvements featured an enhanced streetscape, 
natural playground, educational nature trails, ice skating and fishing amenities, a 
picnic pavilion, outdoor fireplace, and the transformation of the park’s island into an 
arboretum and event space.
Central High School* | Springfield, MA
Project manager. Planning and design of a comprehensive athletic field 
modernization project at Central High School in Springfield MA. The project 
replaced the existing natural grass baseball field with a state-of-the-art synthetic 
turf baseball field while also converting an existing natural turf practice field into a 
versatile synthetic turf multi-sport field designed to accommodate football, soccer, 
lacrosse, softball, and other school and community athletic programs. Supporting 
improvements included the construction of a new ADA accessible press box, 
bleachers, walkway enhancements and installation of sports field lighting.
Berkshire Community College Athletic Field* | Pittsfield, MA
Project manager. Development of a multi-sport synthetic turf field (Gene Dellea 
Community Turf Field). The project included the complete replacement of the 
existing natural grass field with a synthetic turf system designed to accommodate 
multiple sports while significantly increasing field availability and reducing long-
term maintenance requirements. Supporting improvements included new athletic 
amenities, ADA accessible press box and bleacher system built into existing slope, 
accessible pedestrian circulation, and sports lighting. A key component of the project 
was the integration of sustainable site design and stormwater management practices. 
Working collaboratively with civil and environmental engineers, the site was designed 
to effectively collect, convey, and treat stormwater runoff while protecting adjacent 
wetlands and sensitive environmental resources.
Education
B.S. Landscape Architecture & Regional 
Planning, University of Massachusetts, 
2006
Registrations
Registered Landscape Architect: 
Massachusetts (#4206)
Rhode Island (#748)
Connecticut (LAR.0001732)
Year Started with Bowman
2022
Year Started Professional 
Experience
2006
Jonathan Allard, RLA
Project Role: Deputy Project Manager; Landscape Architecture - Task Lead
*Project completed with a previous 
employer

Page 185

15
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Pope Francis Preparatory School* | Springfield, MA
Project manager. This project consisted site master planning and design development 
of traffic and pedestrian control solutions, handicap accessibility applications, design 
and construction of tennis courts, baseball and softball fields, a practice field, and 
a synthetic turf multi-sport field with track and press box/bleacher system. The site 
also included separate pick up and drop off areas for parents and buses and a large 
parking area and bio-retention system. Responsibilities included master planning and 
graphic design, design development documentation, construction documentation and 
construction inspection services.
City of Lowell, Muldoon Park Improvements & ADA Kayak Launch | Lowell, MA
Project manager and lead designer for the City’s first open-to-the-public accessible 
kayak launch. The project included a detailed topographic and bathymetric survey of 
the project area, wetland delineation, and the identification of invasive species along 
the Concord riverbank. The project included securing Chapter 91 licensing for access 
to Massachusetts waterways, conceptual planning graphic, design development, 
construction documentation and construction oversight. Commencing of construction 
is anticipated for the spring 2025.
City of Springfield, Redevelopment of Donna Blake Park | Springfield, MA
Project manager, lead designer and project manager. Responsible for initial conceptual 
design through project construction for the redevelopment of an urban neighborhood 
park. The design features included a splash pad, accessible playground with rubberized 
surfacing ADA compliant walkways, a large pavilion, accessible picnic tables, site 
furnishings and landscape and drainage improvements. 
City of Springfield, West Street Corridor Improvements | Springfield, MA
Project manager. Responsible for managing the conceptual design and assisting in 
public outreach and engagement for transportation planning and engineering services 
for the West Street and Plainfield Street corridor by improving safety, enhancing 
pedestrian travel within the study area, and supporting transit service provided by 
PVTA buses. The project included the design of shared-use paths, community gateway 
enhancements, a landscaped median with mid-block crossing and High Intensity 
Activated Crosswalk (HAWK) system as well as safety improvements to pedestrian 
crossings at the Connecticut Riverwalk and Bikeway and highway on and off ramps. 
City of Easthampton, Main Street (Route 10) Design Services | Easthampton, MA
Landscape architect and designer. Responsible for the redesign of the downtown 
corridor (Main Street, Route 10) in Easthampton. The project included streetscape 
enhancements, improving overall safety for all users, increased walkability, and 
reimagined bicycling and transit infrastructure. Participation in public outreach 
included public meetings and stakeholder and citizen walkshops. 
Jonathan Allard, RLA
Project Role: Deputy Project Manager; Landscape Architecture - Task Lead

Page 186

16
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Erin Fredette is a senior project manager with over 17 years of transportation 
planning, traffic engineering and public transit experience. Her transportation 
planning work includes trip generation and distribution, forecast analysis, capacity 
analysis, Synchro modeling and VISSIM modeling. As a specialist in traffic engineering, 
Erin has been involved in a variety of projects from simple data collection to complex 
conceptual design development and analysis as part of a larger multi-disciplinary 
team. Incorporation of transit, pedestrian and bicycle accommodations has been a 
focus for many of her projects ensuring safe and efficient operations for all modes of 
transportation. She has conducted numerous traffic impact studies as well as peer 
reviews for a number of municipalities within New England, reviewing proposed 
mitigation and presenting in public forums. Erin’s experience with public transit 
includes conceptual design, development of graphic materials, participation in public 
outreach and detailed evaluation of potential impacts of transit priority measures 
on other modes of transportation. She continues to be involved in a variety of traffic 
engineering and planning projects in both the public and private sector.
Experience
Inman Square Intersection Safety Improvements | City of Cambridge, MA 
Transportation engineer who led traffic analysis in Synchro and VISSIM to analyze 
and depict the intersection operations under the preferred alternative. Documented 
analysis results and design best practices in a technical memorandum of the 
alternatives analysis. The purpose of the project was to develop multimodal safety 
improvements in alignment with the principles of the Vision Zero Action Plan 
for the City of Cambridge. Design elements included separated bicycle lanes, 
protected intersection treatments, and improved pedestrian facilities; improving and 
simplifying operations for all modes; design of bus stops; provisions for on-street 
parking and loading; and continuing to support the local, residential and business 
communities that define Inman Square. 
River Street Reconstruction | City of Cambridge, MA
Lead transportation engineer responsible for developing an extensive transportation 
analysis model of the River Street corridor and Central Square area for use in 
evaluating potential future transportation infrastructure improvements. Detailed 
calibration of the existing and future models helps provide accurate information for 
decisions to be made regarding potential trade-offs with accommodating each mode 
of transportation along the River Street corridor. Modeling for the project includes 
VISSIM modeling of specific bus route and layover alternatives to understand the 
travel times and delay impacts associated with various routing and layover options. 
Evaluation of corridor alternatives include feasibility of an exclusive bus lane and 
transit signal priority along River Street. Responsible for developing an extensive 
transportation analysis model of the River Street corridor and Central Square area for 
use in evaluating potential future transportation infrastructure improvements. 
Education
B.S. Civil Engineering, Northeastern 
University, 2009
Registrations
Professional Engineer: Massachusetts 
(#51050)
Presentations
Transportation and Stormwater 101, 
Southern New England American 
Planning Association (SNEAPA), 
October 2019
Pedestrian/Bike Safety & Liability, 
Penn State University (PSU) Safety 
Conference, December 2017
Year started with Bowman
2009
Year started Professional 
Experience
2008
Erin Fredette, PE
Project Role: Traffic Engineering - Task Lead

Page 187

17
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Evaluation of corridor alternatives included feasibility of an exclusive bus lane and 
transit signal priority along River Street.
Grand Junction Multi-Use Path Design | City of Cambridge, MA
Transportation engineer responsible for collaborating with the project team on the 
development and calibration of the VISSIM model along the Massachusetts Avenue 
corridor, including in the refinement of Synchro analysis to try and address the 
signalized intersection directly adjacent to the proposed Grand Junction crossing 
across Massachusetts Avenue. The project will provide improved connections to other 
multi-use paths in the region and preserve the opportunity for future two-track rail 
transit service along the Grand Junction right-of-way. 
MassDOT, McGrath Boulevard Design | Somerville and Cambridge, MA 
Senior project engineer involved with the McGrath Boulevard project from the 
early stages of the planning study through to the current project development and 
environmental permitting phase of the project. Aided in the evaluation of potential 
conceptual design alternatives for the removal of an elevated highway in the City of 
Somerville. Responsible for tasks such as development of existing and future traffic 
volume networks through coordination with the Central Transportation Planning 
Staff and the application of their regional traffic demand model; evaluation of issues 
and opportunities for each of the proposed conceptual alternatives; completion of 
capacity analysis using Synchro software for existing and future traffic conditions 
at over 30 study area intersections; development of graphics, tables, reports and 
presentations for public use. 
BPDA, Mt. Vernon Street Re-Design | Boston, MA 
Senior project engineer responsible for evaluating multimodal transportation needs 
as part of a Complete Streets review and design of Mt. Vernon Street in Dorchester. 
Conducted a review of the existing conditions and evaluated the existing traffic 
volumes and patterns through capacity analysis. Identified and summarized various 
future-year scenarios including proposed area development, future mode splits and 
potential traffic pattern changes. Developed concepts for various roadway cross-
sections and designs including potential cycle tracks, sidewalks, travel lanes and 
opportunities for landscape architecture and “tactical urbanism.” Facilitated discussion 
during meetings associated with public outreach efforts for the project.
Erin Fredette, PE
Project Role: Traffic Engineering - Task Lead

Page 188

18
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Angela Saunders is a senior project manager who has 26 years of experience in 
the field of stormwater design, permitting, transportation engineering, civil/site 
engineering, and construction management. Angela has been a project manager for 
over 9 years, and she has led a variety of projects including roadway improvements, 
bus stop improvements, curb ramp design, and site improvements. Angela has 
extensive experience with National Environmental Policy Act (NEPA) documentation, 
state and federal environmental permits, stormwater management and drainage 
design, culvert replacements and watershed analysis. Angela’s experience 
encompasses preparing contract specifications, engineer’s estimates, bid documents 
and construction services.
Experience
City of Westfield, On-Call Engineering Services | Westfield, MA
Stormwater project manager. Our firm is providing professional engineering services 
on an as-needed basis. Responsible for performing peer reviews of stormwater 
designs to determine if the design meets City, State, and industry standards.
Town of Walpole, Coney Street Improvements | Walpole, MA
Lead stormwater/permitting engineer. Our firm provided engineering design services 
for roadway and traffic signal improvements to approximately 1,700 feet of Coney 
Street from its intersection with the Walpole Mall Driveway to its intersection with 
Joseph Lane. Responsible for the analysis of the stormwater impacts from the project 
to the MassDOT drainage system on Route 1. Designed a bio-retention dry swale and 
leaching catch basins to provide stormwater quality and quantity treatment prior to 
entering MassDOT’s storm drain system on Route 1. Responsible for the stormwater 
management report and coordination with MassDOT for the access permit to 
maintain the drainage connection.
City of Easthampton, Ferry Street Improvements | Easthampton, MA
Project manager for QA/QC & permitting. Our firm was prime consultant for this 
roadway infrastructure and Complete Streets improvement project, which is adjacent 
to Lower Mill Pond. Our firm designed a mini-roundabout and integrated it with 
Manhan Rail Trail crossing, provided on-street parking and accessibility improvements 
for pedestrians and bicycles. Provided QA/QC for the Notice of Intent with the City. 
City of Providence, Safe Streets for All Project | Providence, RI
Senior project manager. The Safe Streets for All Projects (SS4A) are funded through 
a $27.2 million federal grant which is part of the Bipartisan Infrastructure Law which 
requires National Environmental Policy Act (NEPA) documentation. Oversaw the 
preparation of project initiation letters that were submitted by the City to FHWA, 
the lead Federal agency. Oversaw the preparation of a Categorical Exclusion (CE) 
template that included project information, project description, purpose and need 
statement, analysis of existing conditions, environmental impacts, and mitigation 
measures, and a permitting and regulatory overview. Overseeing the preparation 
Education
B.S. Civil & Environmental Engineering, 
Ohio State University, 2000
Registrations
Professional Engineer: 
Massachusetts (#48902)
Rhode Island (#8435)
Certifications
30-Hour Occupational Health & Safety 
Administration
Associations
Women’s Transportation Seminar 
Rhode Island, Past President, Northeast 
Region Council Chair and Member of 
the RIDEM/CRMC Committee
Women’s Transportation Seminar 
Boston, Member
Year Started with Bowman
2000
Year Started Professional 
Experience 
2000
Angela Saunders, PE
Project Role: Stormwater Management - Task Lead

Page 189

19
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Angela Saunders, PE
Project Role: Stormwater Management - Task Lead
of six CE’s and coordinated biological opinions for endangered species and written 
explanations on potential historic, cultural, and archaeological consequences.
City of Providence, Woonasquatucket River Greenway | Providence, RI
Lead permitting engineer. This project’s goal is to improve pedestrian and bicycle 
amenities along the Woonasquatucket River from Eagle Square to Francis Street in 
Providence. The project will also enhance the visitor experience providing pocket 
parks, kayak launch areas and public art to develop a sense of place along this  
one-mile corridor. Oversaw the drafting of the NEPA Categorical Exclusion checklist 
and responsible for coordination with permitting agencies including RIDEM and 
CRMC along with preparation of Category B Assent Application and Application for 
Water Quality Certificate.
Stormwater Management Design & Permitting Experience
Designed stormwater management systems, including closed drainage systems, 
for over 100 projects, including roadway reconstruction, stormwater separation, 
new sidewalks, parking lots, and bike paths. The designs were consistent with 
the MassDEP Stormwater Handbook or the Rhode Island Stormwater Design and 
Installation Standards Manual. Prepared, submitted, and coordinated various permits 
for work within environmental resource areas, including an Assent from Rhode Island 
Coastal Resources Management Council, Freshwater Wetland Permit from Rhode 
Island Department of Environmental Management, Notice of Intent from various 
Massachusetts communities and Massachusetts Department of Environmental 
Protection, Environmental Notification Form with Massachusetts Environmental 
Policy Act, Massachusetts Endangered Species Act Regulatory Reviews, and an 
Individual Permit from United States Army Corps of Engineers. Projects included: 
• Town of Walpole, Coney Street Improvement Project, Walpole, MA
• Weymouth Signal & Roadway Design, Weymouth, MA
• MassDOT, Hartford Turnpike (Route 20) at Grafton Street Intersection, 
Shrewsbury, MA
• MassDOT, Jacksonville Street (Route 8A) over West Branch Brook, Heath, MA
• MassDOT, Route 140 at Route A Intersection Improvements, Westminster, MA
• Franklin Regional Transit Authority, Parking Lot Expansion, Greenfield, MA
• Taunton Street Roadway Improvement Project, Wrentham, MA 
• 31 Bellows Road Parking Lot Expansion, Raynham, MA 
• Lake Avenue North Linear Park and Shared Use Path, Worcester, MA 
• Hartford Avenue North, High Street and Hopkinton Road Improvements, 
Upton, MA 
• Bay Street Sidewalk Project, Taunton, MA 
• Lakecrest Path, Crest Avenue, and Quarry Avenue Roadway Improvements, 
Weymouth, MA 
• Cochituate Rail Trail, Natick, MA 
• Citywide Drainage Improvements, Taunton, MA 

Page 190

20
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Education
B.S. Civil Engineering, Syracuse 
University, 2009
Registrations
Professional Engineer: Rhode Island 
(#15570)
Certifications
OSHA 10-Hour Construction Certified
Associations
Professional Women in Construction, 
Member
Year Started with Bowman
2019
Year Started Professional 
Experience
2009
Stephanie MacDonald, PE
Project Role: Site & Stormwater Management Engineer
Stephanie is a project manager with more than 17 years of experience in design, 
permitting, planning, analysis, review, and infrastructure improvements for 
municipalities, private clients and colleges. Her expertise includes stormwater 
collection, conveyance and treatment design, stormwater modeling, climate 
resilient planning, and green infrastructure implementation; local, state, and federal 
environmental permitting; site design and layout; public outreach and construction 
administration. Stephanie brings over 6 years of experience in Connecticut delivering 
technical designs for diverse site development projects, ensuring compliance with 
regulatory standards and client specifications.
Experience
Winstanley Enterprises LLC City Downtown Crossing Project (100 College 
Street)* | New Haven, CT
Project engineer. Stephanie worked on the design of pedestrian access on plaza 
level and vehicular access for service tunnels for the implementation of a Transit-
Oriented Development (TOD) plan that promoted safety and provided corridor 
mobility. Responsible for stormwater and sanitary sewer combined drainage system 
on plaza level and tunnel level, construction administration, traffic management, and 
coordination with subconsultants.
Edgewater Hill* | Easthampton,CT & Evergreen Walk* | South Windsor, CT
Project Engineer. These projects consisted of New Urbanist, mixed-use developments 
that combined commercial and residential components. Stephanie’s responsibilities 
included preparing site layouts, grading plans, drainage design, and stormwater 
management for preliminary submissions, ensuring that each design met functional 
needs and complied with all applicable local and state regulations.
MassDOT McGrath Boulevard Construction | Somerville, MA & Cambridge, MA
Project manager, stormwater lead and environmental permitting engineer. 
Working closely with the city and state departments on implementing stormwater 
control measures/green infrastructure for urban corridor, CSO separation, and 
drainage resiliency requirements. Part of Design team creating additional shared 
use walks and urban green space. Project management efforts include facilitating 
communication and coordination between state departments, municipal authorities, 
and multidisciplinary design teams to align objectives, resolve conflicts, and drive 
schedule adherence.
Fort Avenue at Winter Island Road Intersection Improvements | Salem, MA
Project manager, stormwater and environmental permitting lead. Responsible for 
maximizing greenspace within roadway right of way design of new stormwater 
drainage system and best management practice implementation performed drainage 
analysis, compensatory storage calculations, and hydrologic and hydraulic modeling. 
Notice of Intent permit application package and stormwater report provided onstreet 
parking and sidewalk continuity.
*Project completed with a previous 
employer

Page 191

21
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Lincoln Street Alignment | West Bridgewater, MA
Project manager, stormwater and environmental permitting lead. Responsible for 
design of new stormwater drainage system and water quality basin for roadway 
realignment, performed drainage analysis and hydrologic and hydraulic calculations. 
Prepared and presented a Notice of Intent permit application package and 
stormwater report.
On-Call Professional Engineering Services | Springfield, MA
Project manager. Our firm is providing professional engineering services on an 
as-needed basis to the Department of Public Works. Responsible for the design 
of stormwater systems, water quality improvements, erosion and sedimentation 
practices and utility layout. Responsible for environmental permitting submissions 
with local, state, and federal agencies. Provides project coordination and public 
outreach.
On-Call Engineering Services | Westfield, MA
Project manager. Our firm is providing professional engineering services on an 
as-needed basis. Responsible for the design of stormwater systems, water quality 
improvements, erosion and sedimentation practices and utility layout. Responsible 
for environmental permitting submissions with local, state, and federal agencies. 
Responsible for providing third party review services for stormwater management 
permits. Provides project coordination and public outreach.
Intersection Improvements at Springdale Street, Papermill Street, and Union 
Street | Westfield, MA
Senior project engineer. Our firm provided intersection improvements to improve 
vehicular operations involving traffic signal installation and roadway resurfacing 
at two Union Street intersections crossing Powdermill Brook and Pond Brook. 
Responsible for design of stormwater system and improvements, erosion and 
sedimentation controls, prepared and presented Notice of Intent permit application 
package and stormwater management report to City Conservation Commission, 
provided project coordination, and public outreach.
Union Street at Springdale Road Intersection Improvements | Westfield, MA
Senior project engineer. Responsible for design of stormwater system and 
improvements, erosion and sedimentation controls, prepared and presented Notice 
of Intent permit application package and stormwater management report to City 
Conservation Commission, provided project coordination, and public outreach.
Town of Middleborough Downtown Improvements | Middleborough, MA 
Senior project engineer. Responsible for drainage and utility design and construction 
administration throughout project completion for the improvements to Center.
Stephanie MacDonald, PE
Project Role: Site & Stormwater Management Engineer

Page 192

22
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Antonia Thomas is a senior project engineer with more than seven years of 
experience. Antonia has been involved in a wide variety of transportation 
engineering projects. These projects have included unit cost estimating, plan layouts, 
stormwater management, traffic management plans, and construction phase services 
and field work.
Experience
Ferry Street Improvements | Easthampton, MA
Staff engineer/construction inspector. This project involved roadway infrastructure 
and complete streets improvement project located on Ferry Street, Easthampton. 
Assisted with auto-turn edits and created six different views of autoturns in AutoCAD. 
Assisted with shop drawing reviews. Performed construction observations of the 
retaining walls being installed and documented the observations with pictures and 
field reports.
B’2021 Roads Improvements | North Adams, MA
Construction administration. Responsible for compiling bid documents and review 
of shop drawings. The project involved the rehabilitation design plans for sidewalks, 
curbing, ADA/MAAB access, road resurfacing, etc. with design, cost estimating, 
bidding, construction monitoring and coordination with the Office of Community 
Development. 
Coney Street Improvements | Walpole, MA
Staff engineer. Assisted with construction services for this Coney Street Project. The 
construction services included construction monitoring, preparing detailed daily 
reports of construction activities, completing shop drawing reviews, responding to 
contractor requests for information (RFI) and/or coordinating responses with Town 
as appropriate, and attending construction meetings. The project included proposed 
roadway layout, sidewalk and curbing, pavement markings and signage, signalized 
intersection, and drainage improvements. The construction performed was based on 
the Construction Plan Set and the contract book.
City Walk Bicycle and Pedestrian Improvement Project | Providence, RI 
Construction inspector. Responsible for performing construction observations 
weekly. During the observations, pictures were taken and reports were written to 
discuss what was completed on that day. Coordinated with the contractor and testing 
companies to collect samples of any materials brought on-site. Also responsible for 
coordinating with the contractor to discuss the construction schedule and weekly 
tasks to be completed. Completed pay requisition reviews.
Edens Interstate 93 Frontage Road at Jan Karski Way | Boston, MA
Staff engineer/construction inspector. Assisted with updating the bid package by 
preparing an OPCC, updating the special provisions, preparation of the bid form and 
construction bidding. Also assisted with all construction services within a nine-month 
Education
B.S. Civil Engineering, University of 
Massachusetts - Dartmouth, 2018
Certifications
OSHA 10 Certified
Associations
American Society of Civil Engineers, 
Member
Women’s Society of Civil Engineers, 
Member
Women’s Transportation Seminar 
(WTS-RI), Programs Committee, 
Member
Year Started with Bowman
2018
Year Started Professional 
Services
2018
Antonia Thomas
Project Role: Construction Adminstration - Task Lead

Page 193

23
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
period, attended all meetings with contractors, reviewed shop drawings, prepared 
punch list summaries and performed site visits to monitor construction. Supervised 
construction by completing many field reports and taking pictures. Attended the final 
inspection of the construction site. 
Town of Middleborough Downtown Improvements | Middleborough, MA
Staff engineer. This project involved improvements to Center Street within the 
downtown Middleborough, including the modification of the Everett Square area, a 
six-way intersection with excess pavement, a lack of definition for the path of travel 
for the vehicles. Project improvements included the realignment of several project 
roadways to improve safety and usability for all modes of travel. Assisted with loop 
detector signal plan revisions. Responsible for multiple plan revisions, response to 
comments and estimate revisions. Completed field work for test pit monitoring on site. 
City of Central Falls Roadway Inventory | Central Falls, RI
Staff engineer. Assisted with updating all existing roadway inventory with the use 
of Roadbotics, and Google Maps. Also assisted with the completion of the unit cost 
estimate. Completed cost estimates for complete streets and residential streets. A 
comprehensive video data collection on smartphones started the project. The data 
was analyzed at 10-foot increments by computer algorithms and machine learning 
to assess the roadway condition and the existing roadway to include the roadway 
condition and Complete Streets criteria, including crash data, radar speed studies, 
bicycle facilities, sidewalk quantity and quality, crosswalk facilities, curb ramps, public 
transit facilities, and travel lane widths. 
RIDOT Route 6/10 Interchange | Providence, RI
Staff engineer. As part of a Design-Build team, our firm was responsible for the 
preparation of the Transportation Management Plans (TMPs) for demolition of U.S. 
Route 6 bridges. The TMPs included analysis to determine the optimal time and lane 
configuration for the bridge deck and beam demolition. Assisted with TMPs and 
provided an aerial to access detour options.
North Agawam Infrastructure Planning | Agawam, MA
Data coordinator & collector. Responsible for coordinating to finalize all maps for data 
collection and performing the field evaluations. In addition, analyzed and exported 
all compiled data. This project involved engineering services for a comprehensive 
assessment of the overall condition of infrastructure in the North Agawam 
neighborhood, including streets, sidewalks and curbing, stormwater systems, and 
other associated public works projects. 
Antonia Thomas
Project Role: Construction Adminstration - Task Lead

Page 194

E
Relevant Experience
03
SECTION 

Page 195

25
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Description
Bowman was retained as a subconsultant on an on-call basis to provide Traffic 
Engineering services. Bowman developed traffic signal design for the Route 53 (South 
Street)/Coal Pit Hill Road and Route 53 (South Street)/Town Hill Avenue intersections 
as part of a bigger project that is addressing drainage and stormwater management 
issues within the City of Danbury and increasing vehicular capacity at Coal Pit Hill 
Road intersection. 
As part of this design, Bowman updated the crash and traffic analyses provided by 
CTDOT, as well as determining appropriate signal phasing and timing and developing 
splits and offsets for the corridor, as these traffic signals will become part of an 
existing coordinated closed loop system in Danbury. Deliverables included traffic 
signal plans, pavement marking and signing plans, traffic signal estimates and 
specifications, and crash rates.
Traffic Signal Design City of Danbury
Danbury, CT
Client
Connecticut Department of 
Transportation (CTDOT)
Firm’s Fee
$69,000
Schedule
2017
Services Provided
Field Reconnaissance
Traffic & Safety Analysis
Traffic Signal Design
Pavement Markings & Signage

Page 196

26
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Description
Bowman was retained as a subconsultant on an on-call basis to provide Traffic 
Engineering services to CTDOT. Bowman developed traffic signal design for the Route 
4 (Derby Turnpike/Baldwin Road intersection in Orange, which has experienced an 
elevated incidence of high severity crashes. As part of this design, Bowman updated 
the crash analysis provided by CTDOT, as well determined appropriate signal phasing 
and timing, and developed splits and offsets for the corridor, as this traffic signal 
would become part of an existing coordinated closed loop system. Deliverables 
included traffic signal plans, pavement markings and signing plans, traffic signal 
estimates and specifications, and crash rates.
Traffic Signal Design for Town of Orange
Orange, CT
Client
Connecticut Department of 
Transportation (CTDOT)
Firm’s Fee
$60,000
Schedule
2018
Services Provided
Field Reconnaissance
Traffic & Safety Analysis
Update to the Crash Analysis
Traffic Signal Design
Traffic Signal Plans
Pavement Markings & Signing 
Traffic Signal Estimates 

Page 197

27
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Description
Our project team was retained by MassDOT through the Federal High Risk Rural 
Roads Program to improve safety at the intersection of Greenville Road (Route 31) 
and Turnpike Road in Ashby, MA. Following a Road Safety Audit and predictive 
safety analysis using the Highway Safety Manual and MassDOT’s SPICE tool, a single-
lane roundabout was identified as the preferred alternative. Services included 
roadway, drainage, stormwater, lighting, signage, pavement marking, and right-
of-way design, as well as local, state, and federal environmental permitting. During 
construction, our team provided shop drawing review, contractor support, traffic 
control and sequencing assistance, and construction phase services. The project also 
incorporated stormwater quality improvements, including upgraded catch basins and 
a bioretention basin, to meet Massachusetts Stormwater Standards to the maximum 
extent practicable.
Greenville Rd. at Turnpike Rd. Intersection Improvements
Ashby, MA
Client
Massachusetts Department of 
Transportation (MassDOT)
Firm’s Fee
$730,000
Schedule
2018 - 2024
Services Provided
Safety Analysis
Capacity Analysis
Alternatives Analysis
Concept Design
Roundabout Design
Stormwater Management Design

Page 198

28
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Description
Bowman assisted the Town of Montague in the design and implementation 
of pedestrian accessibility improvements as part of the Town of Montague’s 
Complete Streets Program. The project focused on enhancing pedestrian safety and 
connectivity along Keith Street, Montague Street, and Turnpike Road by providing 
new sidewalk infrastructure and accessible routes that improve connections to 
nearby schools, neighborhoods, and community destinations.
Services included corridor evaluation, sidewalk and curb design, ADA and MAAB-
compliant pedestrian accommodations, preparation of construction documents, 
opinion of probable construction costs, bidding assistance, and construction phase 
services. The project required close coordination with the Town Planner, Department 
of Public Works, and other municipal stakeholders to develop practical, context-
sensitive improvements that enhance walkability, improve accessibility, and support 
the Town’s long-term transportation and safety goals.
Client
Town of Montague, MA
Firm’s Fee
$86,450
Schedule
September 2025 - In 
Construction
Services Provided
Transportation Engineering
Roadway Design
Surveying
Landscape Architecture
Construction Plans & Contract 
Documents
Bidding Services
Construction Administration 
Town of Montague Complete Streets
Montague, MA

Page 199

29
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Description
Our project team was retained by the City of Westfield to design intersection and 
roadway improvements on Union Street at the intersection of Springdale Road and 
Papermill Road and prepare construction plans and contract documents for bidding. 
The project design consisted of roadway realignment, traffic signal installation, 
roadway widening, drainage improvements, site access improvements for abutters, 
retaining wall design, pavement resurfacing and landscape enhancements.
The project was subject to the MA Wetlands Protection Act and Westfield Wetlands 
Protection Ordinance as it is situated between two brooks and adjacent to a 
groundwater well. An Order of Conditions was obtained from the local Conservation 
Commission for the roadway construction, including widening and drainage 
modifications within the wetland resource areas. 
Client
City of Westfield, MA
Cost
$483,242
Schedule
2018 - 2020
Services Provided
Roadway Design
Traffic Signal Design
Signals & ITS
Traffic & Parking
Highways, Streets & Structures
Environmental Permitting
Construction Plans & Contract 
Documents
Construction Bidding Services
Construction Administration Services
Intersection Improvements at Springdale Road
Westfield, MA

Page 200

30
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Description
Our project team is providing transportation engineering design services for the 
intersection improvements at Fort Avenue and Winter Island Road, Columbus 
Square, Columbus Avenue and Memorial Drive in Salem. The proposed intersection 
improvements are based on the “Multi-Use Path & Intersection Realignment” concept 
plan, dated December 28, 2020, which was prepared by our firm as part of the Salem 
Willows Park Transportation Plan. Services we provided included conceptual design, 
preliminary design, final design, meetings/coordination and public engagement. Our 
scope of work includes:
• Developing design plans to accommodate multi-use/pedestrian crossings of Fort 
Avenue in the vicinity of Winter Island Road, Columbus Square, Columbus Avenue 
and Memorial Drive.
• Evaluating if one or more crossings of Fort Avenue should be provided. Locations 
presumed to be: a multi-use path crossing Fort Avenue, west of Winter Island 
Road to facilitate access to and from the proposed separated bicycle facility, and 
a pedestrian crossing with the associated curb extension and pedestrian ramp 
infrastructure at the intersection of Fort Avenue and Columbus Avenue.
• Providing geometric roadway improvements to promote traffic calming at the 
following intersections: Fort Avenue at Columbus Avenue/Memorial Drive, Fort 
Avenue at Columbus Avenue/Columbus Square and Fort Avenue at Winter Island 
Road.
Client
City of Salem, MA
Cost
$250,000
Schedule
2021 - 2024
Services Provided
Transportation Engineering
Fort Avenue at Winter Island Road Intersection 
Salem, MA

Page 201

31
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Redevelopment of Donna Blake Park
Springfield, MA
Description
Donna Blake Park is a 1.7-acre neighborhood park in Springfield located in the 
Upper Hill Area. The City selected Bowman to provide comprehensive design and 
construction administration services for the park’s redevelopment through the state’s 
Parkland Acquisitions and Renovations for Communities (PARC) grant program. 
 
Our team enhanced pedestrian access and universal accessibility throughout 
the park, transforming the aging urban green space into an inclusive and vibrant 
recreational destination. Bowman’s design features a new splash pad, an accessible 
playground with rubberized surfacing, and a large pavilion. Additional improvements 
include ADA-compliant walkways, accessible picnic tables, park signage, upgraded 
site furnishings and landscaping and drainage enhancements. 
 
Bowman led the planning, landscape architectural design and civil engineering 
services from schematic design through construction documentation. Close 
coordination with City officials, community stakeholders and the general public 
helped ensure the design met local needs and complied with grant requirements. 
 
Construction was completed in July 2024, and the revitalized park now offers an 
inviting and accessible community hub that supports recreational equity and 
neighborhood connection.
Client
City of Springfield
Cost
$75,755
Schedule
2023 - 2024
 
Services Provided
Landscape Architecture
Civil Engineering
Planning & Design
 

Page 202

32
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Dwight Street Roadway Improvements
Springfield, MA
Description
This project focused on the analysis and design of retrofit curb extensions, traffic 
signals, and pedestrian safety enhancements along Dwight Street. Key efforts 
included performing detailed traffic flow analyses, assessing interaction points for 
pedestrians, vehicles, bicycles, and transit and designing solutions to improve overall 
safety and operational efficiency in the heart of downtown Springfield. 
Comprehensive site inspections were conducted to evaluate existing conditions, 
and coordination with local authorities ensured compliance with city and state 
regulations. The project aimed to enhance traffic management, reduce congestion, 
and provide safer pedestrian crossings, aligning with the Springfield Department of 
Public Works’ standards for urban roadway improvements. Pedestrian improvements 
included designing bump outs, transit stops, and ADA compliant ramps. 
Client
City of Springfield, MA
Cost
$270,000
Schedule
2023 - 2024
Services Provided
Design of Roadway, intersection 
Improvements & Stormwater
Safety & Traffic Analysis
Concept Design
Construction Plans & CD’s
Construction Administration 

Page 203

33
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Description
Bowman was retained by the City of Easthampton, using a MassWorks funding 
grant, to design intersection and roadway improvements on Ferry Street and 
prepare construction plans and contract documents for bidding. The primary goal 
of the project was to improve a roadway section of Ferry Street and intersection 
improvements to Lovefield Street/Pleasant Street with the construction of a mini 
roundabout. The project area includes pedestrian, bicycle, and parking improvements 
through the use of a shared-use path, pedestrian crossings and new parking areas. 
The design improved the connection to the existing City Rail Trail and created an 
extension through the project area. The drainage system was upgraded, lighting 
added, utilities were improved and landscape and streetscape enhancements 
beautified the area. Watermain improvements were included within the project area 
to accommodate the private redevelopment at One Ferry Street and the city’s aging 
infrastructure. 
We obtained a local stormwater management permit for additional structures and 
piping to the existing stormwater systems, an order of conditions due to work within 
wetland resource area and buffer of adjacent pond and a dam safety permit due  
to part of Ferry Street was also part of Lower Mill Pond Dam. Working together with 
the city and the Office of Dam Safety to satisfy their individual requirements, the 
following modifications were implemented; minimized penetrations within roadway/
dam, detailed specifications for backfill material used within roadway for trenches, 
and developed additional construction sequencing plans and specifications for 
embankment stabilization.
Client
City of Easthampton, MA 
Cost
$489,900
Schedule
2019 - 2020
Services Provided
Roadway & Pavement Design
Parking Layout
Shared-Use Path Design
Street Lighting
Drainage & Stormwater Improvements
Utility Design
Environmental Permitting
Construction Administration Services
City of Easthampton Ferry Street Improvements
Easthampton, MA

Page 204

34
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Client
Town of Middleborough, MA
Schedule
Construction completed 2022
Services Provided
Transportation Engineering
Construction Administration
Description
The team completed traffic counts, assessed signal warrant criteria, developed 
design plans for intersection layout, pavement design and resurfacing, drainage and 
watermain replacement, and construction documents for the proposed intersection 
improvements at two locations along Center Street. The first location, John Glass, Jr. 
Square, is the junction of Center Street, Everett Street, High Street, Station Street, and 
Center Avenue, and the second location is the intersection of Center Street and Oak 
Street.
The project was designed in accordance with MassDOT, AASHTO and MUTCD 
standards, to improve the horizontal and vertical geometric layout at the 
intersections, modify curb and sidewalk extensions to more clearly define the limits of 
parking, the path of each approach leg and the intended refuge for pedestrians and 
redesign 14 sidewalk curb ramps to meet requirements of ADA and AAB. Due to the 
relatively narrow right-of-way and the proximity of existing buildings to the roadway 
edge, design exceptions for bicycle accommodation were required and prepared.
Utility design included over 1,700 LF of watermain replacement and over 800 LF of 
two new drainage systems. Additional upgrades to the existing storm sewer systems 
and utility infrastructure were designed, and coordinated with MassDOT District 5 
and the Town of Middleborough. 
In addition to preparation of the construction plans and documents, the team 
provided construction bidding services and is currently providing construction 
administrative services. 
Middleborough Downtown Improvements
Middleborough, MA

Page 205

35
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Description
Our firm provides professional engineering services on an as-needed basis to the 
Department of Public Works, focusing on transportation planning, traffic engineering, 
and landscape architectural services for the West Street Corridor improvements.
Phase 1 included community engagement and proposed solutions to improve 
safety, enhance pedestrian travel, and support PVTA bus transit. Key tasks included 
analyzing existing conditions, evaluating potential corridor treatments, conducting 
traffic analysis, and developing conceptual designs.
Phase 2, currently underway, involves advancing conceptual plans into a final design 
submission for the MassWorks Application Plan Set. This phase includes traffic data 
collection and analysis, preliminary design, traffic signal and street light design, traffic 
management plans, detailed design plans, special provisions, and construction cost 
estimates.
Client
City of Springfield, MA
Firm’s Fee
$300,000
Schedule
2022 - Ongoing
Services Provided
Existing Conditions Analysis
Traffic Analysis
Traffic Signal Design
Traffic Management Plans
Transportation Planning
Traffic Engineering
Roadway Design Plans
Landscape Architecture
Community Engagement
On-Call Engineering Services, West St. Corridor Task
Springfield, MA

Page 206

36
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Filley Park Improvements
Bloomfield, CT
Provided landscape architecture and design services for improvements at Filley Park in 
Bloomfield, Connecticut, focused on enhancing recreation, accessibility, and the overall 
visitor experience while preserving the park’s character. Services included conceptual 
and detailed landscape design, planting plans, grading and ADA accessibility, site 
furnishing and material selection, and coordination with the multidisciplinary design 
team. Improvements featured an enhanced streetscape, natural playground, educational 
nature trails, ice skating and fishing amenities, a picnic pavilion, outdoor fireplace, and 
the transformation of the park’s island into an arboretum and event space.
Previous Employer Experience
Pope Francis Preparatory School
Springfield, MA
This project consisted site master planning and design development of traffic  
and pedestrian control solutions, handicap accessibility applications, design and 
construction of tennis courts, baseball and softball fields, a practice field, and a synthetic 
turf multi-sport field with track and press box/bleacher system. The site also included 
separate pick up and drop off areas for parents and buses and a large parking area and 
bio-retention system. Responsibilities included master planning and graphic design, 
design development documentation, construction documentation and construction 
inspection services.
Berkshire Community College Athletic Field
Pittsfield, MA
Development of a multi-sport synthetic turf field (Gene Dellea Community Turf Field). 
The project included the complete replacement of the existing natural grass field with 
a synthetic turf system designed to accommodate multiple sports while significantly 
increasing field availability and reducing long-term maintenance requirements. 
Supporting improvements included new athletic amenities, ADA accessible press box 
and bleacher system built into existing slope, accessible pedestrian circulation, and 
sports lighting. A key component of the project was the integration of sustainable site 
design and stormwater management practices. Working collaboratively with civil and 
environmental engineers, the site was designed to effectively collect, convey, and treat 
stormwater runoff while protecting adjacent wetlands and sensitive environmental 
resources.
Jon Allard, RLA | Landscape Architect Task Lead
Jon Allard began his career in Connecticut, spending the first seven years working out 
of Manchester, where he gained extensive experience across a wide range of roadway, 
site development, state, municipal, and private projects. This early work provided Jon 
with a strong foundation in multidisciplinary project delivery and fostered a deep 
understanding of Connecticut’s local conditions and state and municipal standards. 
Below are a few similar projects that Jon completed with a previous employer that 
are relevant to the Town of Granby’s Professional Engineering request

Page 207

37
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Central High School Athletic Fields
Springfield, MA
This project inlcuded the planning and design of a comprehensive athletic field 
modernization project at Central High School in Springfield MA. The project replaced 
the existing natural grass baseball field with a state-of-the-art synthetic turf baseball 
field while also converting an existing natural turf practice field into a versatile synthetic 
turf multi-sport field designed to accommodate football, soccer, lacrosse, softball, and 
other school and community athletic programs. Supporting improvements included the 
construction of a new ADA accessible press box, bleachers, walkway enhancements and 
installation of sports field lighting.
Previous Employer Experience
Morrill Science Center
Amherst, MA
This project consisted of the design and development of the Morrill Science Center 
corridor project at the University of Massachusetts Amherst. The project included 
landscape design improvements that promoted sustainability and accessibility, featuring 
updated pedestrian pathways, accessible entrances, and integrated stormwater 
management systems to reduce runoff and enhance site resilience. Graphic materials 
were developed to engage stakeholders and guide the project through design phases. 
The project focused on accessibility, stormwater improvements, safety and landscape 
aesthetics throughout the corridor.
Mechanic Street Stormwater Improvements
Spencer, MA
This project consisted the design and implementation of a sustainable streetscape 
and parking lot featuring green stormwater infrastructure. The project incorporated 
bioretention rain gardens, underground infiltration systems, and other stormwater 
practices to reduce runoff, improve water quality, and enhance the downtown 
streetscape. Improvements also transformed an underutilized parking area into an 
attractive public space with educational signage highlighting sustainable stormwater 
management.
Jon Allard, RLA | Landscape Architect Task Lead

Page 208

38
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
SITE CONSIDERATIONS  
03 Plan Considerations and Phasing
Community Park South
Princeton, NJ
Bowman and our teaming partner Mahan Rykiel are developing a comprehensive 
master plan for a 20-acre public park in Princeton, New Jersey, designed to reflect the 
community’s vision and evolving recreational needs. The planning process emphasizes 
inclusive, transparent stakeholder and public engagement to ensure that residents, local 
officials and interest groups have a meaningful voice in shaping priorities and amenities. 
Through a series of ongoing workshops, surveys and public meetings, the team is 
gathering input to guide the park’s design and functionality.  
Additional Recreational Field Design Projects
Branch Brook Park & Yanticaw Park
Newark & Nutley, NJ
Bowman secured the contract for the redesign of two baseball fields at Branch Brook 
Park and one softball field at Yanticaw Park. The two fields at Branch Brook park were 
existing natural turf fields and were to be converted to synthetic turf. Improvements 
included synthetic turf, stormwater system, sports field fencing and players seating, 
sports lighting, drinking fountain, bleachers, scoreboard and hardscape improvements. 
The softball field at Yanticaw park was an existing synthetic turf field with an all clay 
infield. Our task was to replace the clay infield with synthetic turf.  
Kushner Academy Fields
Township of Livingston, Essex County, NJ
Bowman provided civil engineering, landscape architecture and surveying services to 
the Joseph Kushner Hebrew Academy, a K-12 facility, for the redesign of their recreational 
fields and playground areas. The school also serves as the location of a summer camp 
program. Improvements consisted of a synthetic turf soccer field, three basketball courts, 
swimming pools, a natural grass baseball field and a camping area with cabins for the 
students. Other site improvements include parking lot modifications, landscaping and a 
proposed stormwater management system to collect and control the stormwater runoff.  
Oak Knoll School Athletic Fields
Chatham, NJ
Bowman provided professional surveying, engineering, planning and landscape 
architectural services for the design of this state of the art athletic campus on 13-acres 
within Chatham, NJ. The project consisted of the design and implementation of two 
soccer fields, a clay infield softball field and a two-story athletic building. The athletic 
fields were specifically designed with turf and under drains to allow for fast dry times 
during rainfall events and a “fertigation” system which both irrigates as well as fertilizes at 
the same time through the irrigation system. 

Page 209

E
References
04
SECTION 

Page 210

40
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
References
City of Easthampton
Greg Nuttelman 
DPW Director 
50 Payson Avenue 
Easthampton, MA 01027 
413.529.1400
dpw@easthamptonma.gov
Town of Walpole  
Carl Balduf, PE, PLS 
Town Engineer  
135 School Street 
Walpole, MA 02081 
508.660.7213 
cbalduf@walpole-ma.gov
Town of Middleborough 
Christopher Peck  
Director of Public Works 
48 Wareham Street 
Middleborough, MA 02346 
508.946.2481 
cpeck@middleborough.com
City of Lowell
Sarah Brown
Chief Design Planner
Department of Planning and Development
50 Arcand Drive
Lowell, MA 01852
978.674.1446
sbrown@lowellma.gov
City of Westfield
Randy Brown
Director
City of Westfield
28 Sackett Street
Westfield, MA 01085
413.564.3126
randy.brown@cityofwestfield.org
Town of Russell
John Hoppe
Highway Foreman
Town of Russell Highway Department
162 Main Street
Russell MA 01071
413.862.6222
jhoppe@townofrussell.us
City of Springfield - DPBRM 
Laura A. Walsh
Senior Parks Project Manager
200 Trafton Rd.
Springfield, MA 01108
413.886.5186
lwalsh@springfieldcityhall.com
City of Springfield 
Andrew J. Krar, PE
City Engineer
70 Tapley St.
Springfield, MA 01104
413.784.4884
MassDOT
Jonathan Freeman
Project Manager
MassDOT
10 Park Plaza, Boston MA 02116
857.368.4636
jonathan.e.freeman@dot.state.ma.us
City of Salem
David Kucharsky
Transportation Director
98 Washington Street, 2nd Floor
Salem, MA 01970
978.619.5697
dkucharsky@salem.com
Town of Montague
Chris Nolan-Zeller
Assistant Town Administrator
Town of Montague
1 Avenue A
Turners Falls, MA 01376
413.863.3200 x109
chrisn@montague-ma.gov

Page 211

E
Project Approach & Understanding
05
SECTION 

Page 212

42
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
As the RFP/Q states, the Town of Granby is seeking to engage one 
or more multidisciplined engineering firms for a variety of services 
on an as-needed basis to assist on various public infrastructure 
projects. Projects could include the planning, design and 
construction of a replacement athletic/running track and baseball 
and softball fields at the high school / middle school complex, the 
construction of a year-round bathroom and pickleball courts at 
Salmon Brook Park, administration of a sewer pump maintenance 
project and various other engineering tasks. Consultants(s) may 
be asked to complete projects, which require special expertise on 
a variety of services. We are fully equipped to provide the Town of 
Granby with comprehensive engineering design and consulting 
services. Our experience and technical capabilities make us a 
reliable partner in maintaining the quality and integrity of Granby’s 
development projects.
Responsiveness and Flexibility for On-Call Assignments
Bowman’s staff is well situated to allow us to respond immediately 
to each assignment, and to adjust staffing to allow us to address 
unforeseen issues and delays quickly to keep the project moving. 
Our success and responsiveness to the Town is reflective of our 
ability to anticipate, coordinate, and where possible, control 
the effects of variables, such as design coordination, public 
engagement, cost information, changes in scope, and numerous 
other factors. We recognize that the planning, budgeting, 
scheduling, and progress monitoring functions of our team are 
critical for the success of a project. 
Based on our past experiences working with similarly sized 
municipalities, we understand time is of the essence for on-call 
services with requests being initiated by the community and 
elected officials. 
The cornerstone of a successful on-call civil engineering project 
is communication between the Town and the consultant team. 
Bowman strives to provide ample communication to keep the 
Town apprised of each projects’ progress along with project 
developments and opportunities. 
Project Understanding
For this current On-Call Engineering Services, 
Bowman has the in-house expertise to readily 
assist the Town for the following areas of 
expertise:
• Consultation and Advice
• Feasibility Studies
• Field Investigation and Engineering Data 
Collection
• Engineering Reports
• Construction Cost Estimating
• Engineering Design Services
• Municipal Park Planning and Design
• Land Surveying
• Landscape Architecture
• Construction Management and Inspection
• Value Engineering
• Definitive Plan and Subdivision Experience 
• Expert Testimony
• State and Federal Permitting Experience
• State and Federal Funding Assistance
• Environmental Permitting
• Geographic Information Systems
• Highway and Street Engineering
• Pavement Management
• Traffic Engineering

Page 213

43
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Bowman’s managerial approach is based upon our successful experience leading and participating in numerous project-
order contracts for state DOT’s; and on-call contracts with municipalities, such as Springfield, Westfield, and Salem 
Massachusetts. We know that the key to successful project order assignments under this contract will be to respond quickly 
and develop a clear understanding of the task at hand, assign the right people to the job, and provide coordination and 
communication with Granby town staff, and community stakeholders as needed for the assignment. By assembling the right 
team, we can easily meet the needs of a task assignment. Our approach will ensure that the Bowman team will satisfactorily 
meet the City’s administrative and technical standards, while managing and designing multiple and varied assignments. We 
also understand that assignments under this on-call contract could have varied duration periods. These could range from a 
few days to others that may be multi-year assignments. Bowman’s approach is that no task is too small or too large and we 
will use our experience, expertise, and responsiveness on assignments requested by the Town.
On-Call Project Order Contract Experience
Bowman is confident in our team’s ability to assist the City with project order assignments on time and within budget. Our 
Project Manager, Paul Furgal, PE, PTOE will be responsible for monitoring the financial and work progress status of each 
project order assignment. He will ensure that the Bowman team is committed to providing the necessary resources to meet 
established milestones. He will be supported by Jon Allard, RLA as Deputy Project Manager. Jon has extensive experience 
in municipal park design and various public and private design projects. Along with our project summaries, we have included 
a project experience sheet detailing various projects that Jon has designed and managed that we feel are representative of 
the type of projects that have been identified in the ‘description of services’ section of the RFP.
Project Management and Project Controls
Bowman’s project management approach is tailored to providing a quality product on time and on budget. A key to 
achieving that outcome is clear understanding and communication of project scope, deliverables, schedule and budget. 
To that end, Bowman will develop a Project Management Plan that defines the project scope, team organization and 
responsibilities, project approach and key issues, project schedule and major milestones. For the project milestones, 
deliverables will be will identified. The submission and review time of the project deliverables will be reflected in the 
project schedule. A kick-off meeting will be held for the consultant team members to provide an understanding of project 
requirements. On-going coordination and communication with the Town of Granby’s Project Manager and other key staff 
are also important to advance the assignments. Regularly scheduled meetings to provide project updates and resolve issues 
will be held. Working with the Town of Granby, we will also establish a meeting schedule with stakeholders for assignments 
as needed. As the Bowman team has done on other on-call contracts, each individual on-call assignment will be managed 
as a separate project, including a separate communication, analysis, permitting and design files. At each step of analysis and 
design, Bowman will conduct quality assurance and quality control. This approach will facilitate our end goal, to provide a 
quality product on time and on schedule for the Town of Granby.
Project Approach

Page 214

E
Fee Schedule
06
SECTION 

Page 215

45
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
Page 7 of 7 
 
 
 
APPENDIX A 
 
Cost Proposal 
 
 
Name of Engineering Firm: ___________________________________________________ 
 
 
Services Needed 
 
 
On-Call Engineering and Related Services 
 
Please indicate your firm’s hourly fees over the five-year period of the contract 
 
Billing Category    Hourly Billing Rate 
 
Project Manager    ________________ 
Chief Engineer    ________________ 
Engineer     ________________ 
Technician Support    ________________ 
Clerical/Researcher    ________________ 
Other      ________________ 
 
Other Expenses (if applicable): 
 
 
 
 
 
 
Identify any other categories and costs required to provide Engineering and On-Call 
services that are not included above:  
 
________________________________________________________________________ 
________________________________________________________________________ 
________________________________________________________________________ 
Bowman Consulting Group Ltd.
$225
$190-215
$190
$100-155
$95
Labor rates, subconsultant costs, equipment expenses, and other direct costs may change over time 
due to market conditions and inflation. Accordingly, the hourly billing rates provided are based on 
current rates and may be adjusted periodically during the contract term in accordance with the 
terms of the agreement and with the Town’s review and approval. Any extraordinary services or 
specialized subconsultant services requested outside the scope of the on-call agreement would 
be discussed with and authorized by the Town prior to incurring such costs. Please see Bowman’s 
current billing rates on the next page.
*See rates on next page

Page 216

46
Bowman | Town of Granby Professional Engineering Services | July 24, 2026
 
 
 
BOWMAN CONSULTING GROUP LTD. 
 
SCHEDULE B –MUNICIPAL HOURLY RATES 
January 2026 
 
 
CLASSIFICATION HOURLY RATES 
Principal $225.00/HR 
Department Executive $225.00/HR 
Team Leader $225.00/HR 
Senior Project Manager $215.00/HR 
Project Manager II $215.00/HR 
Project Manager $190.00/HR 
Assistant Project Manager $175.00/HR 
Project Coordinator $145.00/HR 
Senior Surveyor $205.00/HR 
Engineer I | Engineer II | Engineer III |Engineer IV $125.00/HR | $150.00/HR | $160.00/HR | $190.00/HR 
Planner I | Planner II | Planner III $120.00/HR | $145.00/HR | $155.00HR 
Designer I | Designer II | Designer III $105.00/HR | $110.00/HR | $115.00/HR 
CAD Drafter I | CAD Drafter II $100.00/HR | $105.00/HR 
Senior Construction Inspector $145.00/HR 
Construction Manager $185.00/HR 
Construction Inspector $130.00/HR 
Senior Construction Technician $170.00/HR 
Technical Lead $205.00/HR 
Traffic Technician $110.00/HR 
Traffic Counter $  70.00/HR 
Survey Technician I | Survey Technician II | Survey Technician III $100.00/HR | $110.00/HR | $155.00/HR 
Survey Field Crew - 1 Person $140.00/HR 
Survey Field Party $100.00/HR 
UAV Operation $110.00/HR 
Office Manager $105.00/HR 
Adm Professional $  95.00/HR 
 
 
 
 
 
ECT Hourly Municipal Rate Table 2026 –SEPA/NJ                  Initials:  Bowman     / Client                 
 
Hourly Rates

Page 217

Page 218

PROPOSAL / JULY 24, 2026
Professional  
Engineering Services 
Town of Granby, CT

Page 219

www.bscgroup.com
CORE SERVICES
Engineering 
Planning & Design
Ecological Science & Permitting
Land Survey
GIS & Software Solutions
AT A 
glance
OFFICE LOCATIONS
HEADQUARTERS 
Boston, MA
Andover, MA
Hyannis, MA
Worcester, MA
Glastonbury, CT
Manchester, NH
1965 210
BSC 
FOUNDED
TEAM 
MEMBERS

Page 220

Dear Mr. Walsh:
The Town of Granby is advancing a range of important municipal and capital improvements for the 
community, including upgrades to the high school/middle school athletic complex, new restroom 
and pickleball facilities at Salmon Brook Park, and sewer pump maintenance and administration. 
These priorities are taking shape at a time when each capital investment must be practical, 
durable, and financially defensible. For this five-year task-order contract, the Town needs a 
responsive engineering partner who can define scopes, evaluate alternatives, establish realistic 
budgets and phasing, and guide authorized projects from planning through construction.
BSC Group, Inc.’s (BSC) multidisciplinary team is well positioned to help Granby deliver durable, 
maintainable, and community-supported projects that protect public investment, improve 
infrastructure reliability and recreation assets, and preserve the Town’s natural resources and 
character. BSC provides expert, in-house capabilities in civil and transportation engineering, 
landscape architecture, environmental permitting, and construction engineering and 
administration, with specialized expertise in athletic field design, utility engineering, and 
stormwater management and drainage solutions. We offer the following advantages: 
Established Experience Supporting the Town of Granby
BSC already supports the Town of Granby through a current on-call surveying contract led by 
Michael Healey, PLS, providing our team with familiarity with the Town’s staff, procedures, 
municipal assets, and project expectations. Assignments have included the Evangeline Place 
Topographic Survey and, notably, survey services at Salmon Brook Park, giving BSC direct 
knowledge of the site’s existing conditions that can inform the proposed year-round restroom, 
pickleball courts, and future park improvements. This established local and site-specific experience 
will support efficient coordination and cohesive project delivery. 
Long-Standing On-Call Engineering Capabilities
BSC has established strong protocols and procedures for the timely completion of on-call 
assignments. These procedures are grounded in more than six decades of experience supporting 
municipalities and state agencies across Connecticut. BSC currently provides on-call engineering 
services to the cities of Hartford, New Britain, and Waterbury, as well as the towns of East Hartford, 
Simsbury, Waterford, and Windsor. At the state level, BSC has supported agencies including the 
Connecticut Department of Transportation, Connecticut Department of Energy and Environmental 
Protection, Connecticut Department of Construction Services, and the University of Connecticut. 
BSC’s Connecticut-based team has the staffing depth, on-call experience, and established 
management protocols to mobilize promptly, support concurrent assignments, and complete 
authorized services within the Town’s required timeframes.
JULY 24, 2026
Mike Walsh
Town Manager
Town of Granby
15 North Granby Road
Granby, CT 06035
180 Glastonbury Boulevard, Suite 305 / Glastonbury, CT 06033 / 860-652-8227
Engineers
Environmental Scientists
Software Developers
Landscape Architects
Planners
Surveyors
www.bscgroup.com

Page 221

Proven Experience Delivering High-Performance Athletic Facilities
BSC has delivered this exact type of work for Connecticut schools and municipalities. In 
Bloomfield, CT, BSC provided design, engineering, bidding assistance, and construction 
administration for the conversion of the high school stadium from natural grass to synthetic turf, 
along with track and event-area renovations. In Plainville, CT, we designed two new multi-sport, 
all-weather synthetic turf fields, renovated the track and field-event areas, and supported the 
project through bidding and construction. Our work at Norwalk High School addressed especially 
challenging subsurface conditions, with BSC coordinating alongside the geotechnical engineer, 
landscape architect, and architect to incorporate rammed aggregate piers beneath a new track 
and synthetic turf field. 
Athletic facility improvements in Avon and Southington, CT, included synthetic turf conversion, 
track rehabilitation, field-event upgrades, cost estimating, and public coordination. For the City of 
Milford, CT, BSC designed and administered renovations to baseball and softball facilities that 
included synthetic turf, fencing, dugouts, batting cages, and site electrical upgrades. Together, 
these projects reflect the same blend of field programming, grading, drainage, permitting, cost 
control, bid support, and construction-phase services that Granby is seeking for its athletic 
complex improvements.
Trusted Leadership with a Proven Track Record
Serving as principal-in-charge and project manager will be Robert Newton, PE, LEED AP, a 
professional engineer with more than 32 years of experience. Rob has overseen a diverse portfolio 
of projects focused on on-call engineering services, including athletic field and track 
improvements, site and roadway design, stormwater management and drainage, utility and sewer 
system improvements, permitting, and construction administration. Many of these initiatives were 
completed under on-call contracts and delivered promptly in response to client needs while 
supporting economic development. Also critical to his success is his experience providing on-call 
consulting services to municipalities throughout Connecticut and western Massachusetts, serving 
as a trusted advisor to help clients plan and prioritize community improvements while making the 
best use of public funds. 
We appreciate the opportunity to submit our qualifications and look forward to the possibility of 
expanding our support for the Town of Granby. Please contact me at 860-652-8227 or  
rnewton@bscgroup.com if you have any questions about our proposal or would like to  
schedule an interview.
Sincerely,
BSC Group
Robert Newton, PE, LEED AP
Vice President
180 Glastonbury Boulevard, Suite 305 / Glastonbury, CT 06033 / 860-652-8227

Page 222

Table of Contents
01. Narrative  ........................................................................................................................................1
02. Anticipated Town Support ........................................................................................41
03. Cost Proposal ........................................................................................................................43
ON-CALL SURVEYING,  
GRANBY, CT
BSC’s ongoing surveying contract 
with Granby provides established 
familiarity with the Town’s staff, 
procedures, assets, and project 
expectations.

Page 223

BLOOMFIELD HIGH SCHOOL 
ATHLETIC FACILITY, 
BLOOMFIELD, CT
BSC delivered comprehensive design 
and construction-phase services for 
Bloomfield High School’s synthetic 
turf field and renovated running 
track, including major drainage 
improvements engineered to 
withstand extreme rainfall.

Page 224

APPROACH & UNDERSTANDING
BSC’s integrated, multidisciplinary project 
approach allows us to apply expertise across 
disciplines to see a project from every side and 
solve complex planning and design challenges.
Effective Protocols for  
On-Call Service Delivery
The successful delivery of on-call design and 
survey services is dependent upon the 
consultant’s ability to respond to a variety of 
project types with qualified personnel. 
Furthermore, these assignments require 
effective project management techniques to 
assure the availability of appropriate staff, 
effective communication, as well as the quality 
of the final deliverables, often upon short 
notice, and in many cases on simultaneous 
projects.
BSC offers critical experience fulfilling these 
criteria for on-call contracts for public clients at 
the municipal and state levels. Within the state 
of Connecticut, we have provided as-needed 
design and survey services to such agencies 
and communities as the Town of East Hartford, 
Town of Simsbury, Town of Windsor, City of 
Waterbury, City of Hartford, the University of 
Connecticut, the Connecticut Department of 
Administrative Services, the Connecticut 
Department of Energy & Environmental 
Protection, and the Connecticut Department of 
Economic Development. 
As a result of this past experience, we have 
developed proven techniques to assure rapid 
response and timely delivery of task 
assignments. This is achieved through the 
employment of three critical elements:
 ƒ Depth of resources to provide on-call 
services
 ƒ Efficient management approach for rapid 
response
 ƒ Commitment to maintaining budget and 
schedule
Depth of Resources
The depth of our resources further contributes 
to the cost-effective implementation of each 
task. Our team is comprised of individuals with 
diverse professional experience. As a result, 
we can assign tasks to the most appropriate 
qualified individuals, assuring the Town of 
Granby the cost-efficient implementation of 
projects.
Narrative 
NARRATIvE  / 1

Page 225

Commitment to Maintaining  
Budget and Schedule
Essential to our management approach is our 
commitment to maintaining budget and 
schedule, while assuring the quality of our 
deliverables. These elements of our 
management approach are discussed next.
Status Report. BSC will prepare reports for the 
Town of Granby Public Works Department at 
the completion of critical steps during a 
project’s schedule. A project management 
report will be submitted outlining the 
completed activities, and any variance to the 
original project plan.
Project Coordination. BSC will coordinate 
activities with Town of Granby staff, and if 
needed, contractors, utility companies, and 
others to ensure conformance to the project 
schedule. BSC will also be prepared to meet 
with town staff to discuss scheduling and other 
requirements as needed for each task 
assignment.
Record Keeping. BSC will submit copies of all 
project correspondence to the Granby Public 
Works Department. Upon the completion of a 
project task, we will provide Granby with all 
design files, calculations, and supporting 
design pertinent to the project.
Efficient Management Approach for 
Rapid Response
Project manager Robert Newton, PE, will work 
hand-in-hand with the town throughout the 
assignment of task orders, negotiation of 
schedule and cost, and editing of final 
deliverables. Rob will ensure that the town is 
continuously appraised of project status and 
that town standards are rigorously applied to 
meet project needs.
BSC’s project manager will prepare a projected 
work schedule and a detailed level of effort 
tailored to meet the needs of the particular 
task and the town’s goal in implementing the 
project. For more complex assignments, we will 
meet with the town’s project manager to 
determine the appropriateness of the 
submitted schedule and coordinate necessary 
tasks. At times, we may recommend cost-
saving measures or other techniques that we 
may identify as being beneficial to the town.
Following the town’s notice to proceed, our 
appropriately selected staff will immediately 
begin the design effort. Resulting documents 
will undergo a comprehensive QA/QC process 
with plans reviewed and stamped by the 
project manager. Deliverables will then be 
submitted to the town for comment and 
revision, as necessary.
Salmon Brook Park, Granby, CT
As part of BSC’s on-call surveying contract with Granby, our work at  
Salmon Brook Park provides firsthand site knowledge to inform  
proposed improvements and support cohesive project delivery.
2 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP

Page 226

Streamlined Approach Controls Schedule and 
Budget. Our proven procedures for on-call 
consulting contracts have built-in controls to 
maintain cost and schedule commitments.  
The key to meeting budget and schedule 
requirements is the careful preparation of initial 
estimates at the outset of the task order.  
BSC’s project manager will determine a 
realistic budget and schedule for each 
assignment. This will be carefully prepared 
with consideration of the complexity of 
necessary research and estimated man-hours 
necessary to complete the task. The thoughtful 
preparation of initial estimates results in project 
delivery within cost and time parameters, 
which are regularly monitored using BSC’s 
real-time accounting software.
Communication. Finally, regular 
communication with town staff helps to 
maintain schedule and budget, while assuring 
that project deliverables meet the town’s 
objectives. Project manager, Rob Newton, will 
communicate with the town regularly to 
document our progress with current task 
orders. This regular personal contact will keep 
the town apprised of our work, while ensuring 
that our project manager is mindful of the 
town’s goals, priorities, and preferences.
Proven Approach to Athletic  
Facility Design and Delivery
BSC approaches every athletic facility project 
with a clear understanding that these spaces 
are daily assets for students, coaches, families, 
and the broader community. That means 
reconstructing athletic fields and a track that 
not only perform well on game day, but also 
address the underlying grading, drainage, 
stormwater, and site challenges necessary to 
support long-term durability, safety, and ease 
of maintenance.
We pride ourselves on:
 ƒ Clear, coordinated design from site 
investigation through construction 
administration.
 ƒ Athletic facility expertise that supports field 
performance, safety, and user experience.
 ƒ Practical solutions for grading, drainage, and 
stormwater management.
 ƒ Responsive communication with town staff, 
school representatives, and project 
stakeholders.
 ƒ Cost-conscious design that supports bidding, 
construction, and long-term maintenance.
 ƒ A strong understanding of local and state 
permitting and public-sector project delivery.
BSC’s approach is both strategic and grounded 
in real-world implementation. We combine 
technical strength with a collaborative, client-
focused mindset, helping the Town of Granby 
advance reconstruction of the track, baseball 
field, and softball field from concept through 
construction with confidence.
BSC has supported the Town of 
Windsor, CT, through responsive 
on-call engineering services for 
development reviews, infrastructure 
improvements, permitting, and 
construction oversight, as well as the 
design of Wilson Gateway Park.
Wilson Gateway Park, Windsor, CT
NARRATIvE  / 3

Page 227

Extensive Experience in  
Athletic Facility Design
BSC is well-versed in supporting municipalities, 
school districts, and institutional clients with 
the planning, design, and implementation of 
athletic facility improvements. Our work 
includes synthetic turf and natural grass field 
design, track and field-event upgrades, 
drainage and stormwater improvements, site 
utilities, sports lighting, accessibility 
enhancements, circulation and parking 
improvements, and support amenities such as 
bleachers, press boxes, concessions, and 
storage facilities. Across Connecticut, we have 
helped communities modernize athletic venues 
and create safer, higher-performing facilities 
that better serve students, athletes, and 
spectators.
Integrated Design for  
High-Performing Facilities
Athletic field projects demand careful 
coordination of grading, drainage, soils, 
permitting, site access, utilities, and long-term 
maintenance considerations. BSC’s 
multidisciplinary team of landscape architects, 
civil engineers, surveyors, planners, and 
environmental specialists works together to 
deliver athletic facilities that are functional, 
buildable, and responsive to each site’s unique 
constraints. From initial site investigation and 
conceptual design through construction 
documents, cost estimating, bidding, and 
construction administration, we provide 
seamless support at every phase of project 
delivery.
Practical Solutions Grounded in  
Local Experience
Our experience gives us a strong 
understanding of the technical, regulatory, and 
operational issues that shape school athletic 
projects. We know how to collaborate closely 
with school administrators, municipal 
stakeholders, athletic staff, and public agencies 
to develop practical solutions that align with 
program needs, available funding, and long-
term facility goals. Whether the priority is 
improving drainage, replacing worn playing 
surfaces, upgrading spectator amenities, or 
evaluating synthetic turf alternatives, BSC 
brings the insight and experience needed to 
move projects forward efficiently and 
thoughtfully.
Salmon Brook Park Improvements
Through our ongoing surveying work, BSC has 
firsthand knowledge of Salmon Brook Park and 
the considerations associated with 
constructing a year-round restroom facility. 
BSC has designed restroom and concession 
buildings for parks and athletic facilities in 
Windsor, Farmington, Milford, and Waterbury. 
Several projects included coordination with 
local precast building manufacturers to provide 
attractive, durable, and readily maintainable 
facilities. Working with the Town to define its 
specific needs, BSC can design a facility that 
supports park operations and long-term 
community use.
BSC provided comprehensive  
design and construction-phase 
services for the City of Hartford 
Public High School’s new synthetic 
turf field, eight-lane running track, 
field events, lighting, and related 
athletic facility improvements.
Hartford Public High School, Hartford, CT
4 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP

Page 228

MEET THE EXPERT TEAM
BSC has assembled a highly experienced, 
multidisciplinary team to support the Town 
of Granby under this on-call contract, with 
deep expertise in civil and traffic 
engineering, complemented by in-house 
landscape architecture, environmental 
permitting, and construction administration 
services.
We bring decades of experience delivering 
municipal infrastructure projects throughout 
Connecticut, including direct support to the 
Town of Granby under an on-call land 
surveying contract that has provided our team 
with firsthand site experience at Salmon Brook 
Park.
Our team is structured to provide responsive, 
flexible support while maintaining the technical 
depth and project management rigor required 
to deliver high-quality results. We function as 
an extension of municipal staff, offering 
practical solutions, clear communication, and a 
strong understanding of local processes to 
effectively guide each on-call assignment.
In the roles of principal-in-charge and project 
manager, Robert Newton, PE, LEED AP, will 
oversee the contract and serve as the Town of 
Granby’s primary point of contact. Rob brings 
32 years of experience leading 
multidisciplinary teams and delivering civil, site, 
utility, drainage, and transportation projects for 
municipal and state clients.
His directly relevant experience includes 
athletic field and track improvements, 
pickleball and tennis court design, stormwater 
management, drainage design, site utilities, 
sewer system evaluations and improvements, 
permitting, and construction administration. He 
has also managed long-term on-call contracts 
for municipalities and state agencies, 
coordinating clients, subconsultants, technical 
staff, schedules, QA/QC, and construction-
phase services across a wide range of 
assignments. 
Rob’s project portfolio includes synthetic turf 
baseball and softball fields, track and field 
complexes, drainage improvements, sewer 
infrastructure evaluations, roadway and site 
improvements, and municipal capital projects 
requiring practical phasing and close 
coordination with public-sector stakeholders. 
Principal-in-charge and 
project manager Robert 
Newton, PE, LEED AP, led 
the design, permitting, and 
construction administration 
for synthetic turf baseball and 
softball field improvements 
at Jonathan Law High School 
in Milford, CT.
Jonathan Law High School, Milford, CT
NARRATIvE  / 5

Page 229

Our team organizational chart is provided on 
the next page, while detailed resumes 
highlighting each team member’s relevant 
qualifications and experience are included at 
the conclusion of the proposal narrative, 
following descriptions of our most relevant 
projects.
Rob will be supported by a skilled team of  
civil engineers, landscape architects, and 
environmental specialists with direct 
experience delivering athletic facility and 
municipal infrastructure projects throughout 
Connecticut. Together, the team will provide 
the Town with responsive service, clear 
communication, and the technical depth 
needed to successfully deliver each 
assignment under this on-call contract.
BSC’s Robert Newton, PE, LEED AP (pictured second from left) and  
Jesse Harris, PLA, CPSI (pictured at far left) joined the cities of Hartford 
and New Britain, the Town of Farmington, and the State of Connecticut to 
celebrate the groundbreaking of the Batterson Park renewal project, which 
will transform the 266-acre park with expanded recreational amenities and 
habitat conservation improvements.
Batterson Park, Farmington and New Britain, CT
6 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP

Page 230

SPECIALIZED MUNICIPAL 
ENGINEERING EXPERIENCE
BSC is prepared to support the Town of Granby 
with responsive, task-order engineering 
services for both defined capital improvement 
projects and future municipal infrastructure 
needs. Our team based in Glastonbury brings 
integrated civil engineering, site design, 
stormwater management, utility coordination, 
permitting, surveying, landscape architecture, 
ecological services, and construction 
administration experience to help the Town 
advance projects from planning through 
design, bidding, construction, and closeout.
BSC understands that the Town is seeking a 
Connecticut-licensed engineering team to 
support the planning, design, and construction 
of a replacement athletic/running track and 
adjacent baseball and softball fields at the high 
school/middle school complex. 
The Town also requires on-call engineering 
services for projects such as a year-round 
bathroom and pickleball courts at Salmon 
Brook Park, sewer pump maintenance 
assessment, and other municipal civil 
infrastructure needs.
BSC’s multidisciplinary structure allows us to 
match the right staff to each task order, 
whether the assignment requires conceptual 
planning, survey and existing conditions 
documentation, grading and drainage design, 
utility coordination, permitting, public bidding 
support, construction observation, or project 
administration. Our approach is grounded in 
practical municipal engineering, clear 
communication, and an understanding that 
each task must be scoped and delivered 
efficiently, with attention to schedule, budget, 
constructability, and long-term maintenance.
TOWN OF  
GRANBY, CT
TRAFFIC ENGINEERING
Amy Allen, PE, PTOE
PERMITTING
Melissa Kaplan, PWS
CIVIL ENGINEERING
Matt Stephan, PE
LANDSCAPE  
ARCHITECTURE
Jesse Harris, PLA, CPSI 
Rachel Salch, PLA
PRINCIPAL-IN-CHARGE &  
PROJECT MANAGER
Robert Newton, PE, LEED AP
Project Team
Batterson Park, Farmington and New Britain, CT
CONSTRUCTION  
ENGINEERING
Jessie Dupont IV, PE
NARRATIvE  / 7

Page 231

Municipal Civil & Site Engineering
Sound civil engineering forms the basis of 
BSC’s municipal work. Our civil engineers have 
successfully applied their design expertise to a 
broad range of public infrastructure, recreation, 
park, school, and site improvement projects. 
Our services cover each project phase, from 
initial planning and feasibility review to final 
design, bidding, construction administration, 
and owner acceptance.
For Granby, this experience is directly 
applicable to athletic facility improvements, 
park infrastructure, utility upgrades, pedestrian 
access improvements, and other on-call civil 
engineering assignments. BSC can support the 
Town with site planning, grading, drainage, 
utility layout, ADA accessibility, pavement 
design, permitting, cost estimating, 
construction documents, and construction 
phase services.
BSC’s civil and site engineering  
capabilities include:
 ƒ Site planning and layout
 ƒ Athletic and recreation facilities design
 ƒ Site grading and earthwork analysis
 ƒ ADA-compliant pedestrian access and 
circulation
 ƒ Parking, drop-off, and service access review
 ƒ Utility analysis, coordination, and design
 ƒ Stormwater management and  
drainage design
 ƒ Erosion and sediment control planning
 ƒ Construction phasing and sequencing 
support
 ƒ Permitting support
 ƒ Plans, specifications, and bid documents
 ƒ Construction administration and field 
observation
Our civil engineers are experienced working 
on multidisciplinary teams, allowing efficient 
coordination among surveyors, landscape 
architects, environmental scientists, permitting 
specialists, and construction-phase staff. This 
integrated approach is especially valuable for 
task-order contracts where assignments may 
vary in scale, urgency, technical complexity, 
and required disciplines.
BSC provided civil and site design 
for the City of Hartford’s Front Street 
District, including geometric layout, 
grading, storm drainage, sanitary 
sewer, utilities, erosion control, and 
integration with existing downtown 
Hartford infrastructure.
Front Street District, Hartford, CT
8 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP

Page 232

Athletic, Park, & Recreation  
Facility Design Support
BSC understands that recreation and athletic 
facilities must balance performance, safety, 
accessibility, durability, drainage, maintenance, 
and user experience. The replacement athletic/
running track and adjacent baseball and 
softball field improvements identified in the 
RFP will require careful coordination of existing 
conditions, field layout, grading, stormwater 
management, pedestrian access, utility needs, 
construction sequencing, and long-term 
maintenance considerations.
Our team can support the Town with the 
planning, design, and construction of 
recreation-related improvements, including 
athletic fields, courts, walking routes, park 
amenities, restroom facilities, parking and 
access improvements, and supporting 
infrastructure. For the high school/middle 
school complex, BSC can evaluate existing site 
constraints, coordinate survey and utility 
information, develop design alternatives, 
prepare construction documents, and provide 
bid and construction phase services.
At Salmon Brook Park, the anticipated 
bathroom and pickleball court projects will 
require practical site/civil design that responds 
to existing park operations, utility availability, 
accessibility, drainage, public use, and 
constructability. BSC can help the Town define 
project requirements early, identify permitting 
or utility constraints, prepare cost estimates, 
and advance designs that can be implemented 
efficiently.
BSC transformed George Tirado 
Sr. Park in Waterbury, CT, into 
an accessible recreation facility 
featuring a baseball field, 
playground, walking paths, and 
flood-conscious site design.
Front Street District, Hartford, CT
George Tirado Sr. Park, Waterbury, CT
NARRATIvE  / 9

Page 233

ADA Access, Pedestrian Circulation, & 
Site Safety
BSC routinely incorporates ADA accessibility, 
pedestrian circulation, and site safety into 
municipal design assignments. For school, 
park, and athletic facility improvements, safe 
and accessible movement is essential for 
students, athletes, spectators, park users, 
maintenance staff, and emergency access.
Our team can evaluate existing routes, slopes, 
crossings, parking connections, field access, 
restroom access, and pedestrian circulation 
patterns to identify practical improvements. 
Design considerations may include accessible 
routes from parking to fields and courts, 
compliant ramps and walkway grades, safe 
crossings between activity areas, accessible 
spectator areas, maintenance access, and 
temporary pedestrian routes during 
construction.
Rather than treating accessibility as a separate 
requirement, BSC integrates ADA compliance 
into the overall site design, including grading, 
drainage, pavement, utilities, and landscape 
improvements. This approach helps reduce 
conflicts during construction and supports 
facilities that are safe, functional, and usable 
for the full community.
BSC’s context-sensitive design 
for  the Town of Coventry’s Route 
31 Main Street provides significant 
safety improvements, respects 
the corridor’s designated historic 
district, enhances streetscape 
amenities, and improves pedestrian 
connectivity issues through a 
continuous sidewalk.
Route 31 Main Street, Coventry, CT
10 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP

Page 234

Drainage Design &  
Stormwater Management
Stormwater management will be a critical 
component of the athletic field, running track, 
court, restroom, and park infrastructure 
improvements. BSC’s engineers are 
experienced in integrating drainage and 
stormwater strategies into site layouts while 
balancing cost, function, regulatory 
requirements, long-term maintenance, and 
available space.
For athletic and recreation facilities, drainage 
design affects field playability, pavement 
durability, user safety, erosion control, and 
maintenance demands. BSC can evaluate 
existing drainage patterns, identify problem 
areas, develop grading concepts, size drainage 
infrastructure, and prepare stormwater 
management designs that support both project 
performance and regulatory compliance.
Our stormwater services include hydrologic 
and hydraulic analysis, drainage system 
design, low impact development strategies, 
erosion and sediment control plans, 
stormwater management reports, construction 
details, and permitting support. 
Where appropriate, BSC can incorporate 
sustainable stormwater measures such as 
bioretention areas, swales, infiltration practices, 
pervious pavement, and native planting 
strategies that reduce runoff impacts while 
supporting the character and function of the 
site. For Granby’s on-call needs, BSC can also 
assist with drainage assessments, stormwater 
retrofit planning, culvert or pipe evaluations, 
drainage complaints, maintenance 
recommendations, and capital improvement 
planning.
BSC’s design for Wilson Gateway 
Park combines accessible 
recreation amenities with 
sustainable stormwater features 
and received a 2026 Merit Award 
from the Connecticut Chapter 
of the American Society of 
Landscape Architects.
Route 31 Main Street, Coventry, CT
Wilson Gateway Park, Windsor, CT
NARRATIvE  / 11

Page 235

Utility Coordination & Sewer Pump 
Maintenance Support
BSC can support the Town with utility-related 
engineering services, including existing utility 
research, field verification coordination, 
assessment of site constraints, coordination 
with utility providers, development of 
maintenance or improvement 
recommendations, preparation of technical 
specifications, cost estimating, and 
construction or maintenance administration.
For restroom, park, athletic facility, and sewer-
related projects, utility coordination may 
include water service, sanitary sewer, electrical 
service, drainage infrastructure, 
communications, and coordination with 
existing municipal systems. BSC’s engineers 
understand the importance of identifying utility 
constraints early, especially on public sites 
where access, service continuity, safety, and 
maintenance responsibilities must be clearly 
defined.
Our approach emphasizes practical 
recommendations, clear documentation, and 
coordination with Town staff so that utility-
related improvements can be planned, 
budgeted, permitted, and implemented with 
minimal disruption.
Cost Estimating & Budget Support
Accurate cost estimating is a critical part of 
municipal capital project delivery. BSC 
understands that the Town must make 
informed decisions about project scope, 
funding, phasing, bid alternates, and 
implementation priorities. Our team prepares 
cost estimates tailored to each stage of design, 
from early planning-level estimates to detailed 
construction cost estimates based on 
quantities, materials, and current bid data.
For Granby, BSC can support budget 
development for athletic facility improvements, 
park amenities, sewer pump maintenance, 
utility upgrades, and other on-call assignments. 
We use quantity-based estimating methods 
and apply appropriate contingencies based on 
the level of design completion, project 
complexity, site constraints, and market 
conditions.
BSC’s estimating approach also supports 
constructability and decision-making. When 
appropriate, we can identify cost-saving 
opportunities, evaluate alternatives, 
recommend bid alternates, and help the Town 
prioritize improvements based on available 
funding.
At Avon High School, BSC coordinated the planning, permitting, cost estimating, 
bidding, and construction of a competition athletic complex designed for multiple 
sports and long-term performance.
Avon High School Athletic Complex, Avon, CT
12 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP

Page 236

Construction Document Preparation
Quality construction documents are essential 
to delivering successful public projects. BSC 
prepares plans, specifications, details, and bid 
documents that are clear, coordinated, and 
suitable for public procurement and 
construction. Well-prepared documents reduce 
ambiguity, support competitive bidding, limit 
change orders, and provide contractors with 
the information needed to build the project as 
intended.
For task-order assignments, BSC will tailor the 
level of documentation to the needs of the 
project. Some assignments may require 
technical memoranda, sketches, and cost 
estimates, while others may require full design 
plans, specifications, permitting documents, 
and construction bid packages. Our team is 
experienced in preparing documents for 
municipal projects that must be practical, 
biddable, and maintainable.
BSC can also provide construction phase 
services, including pre-bid support, response 
to bidder questions, review of submittals and 
shop drawings, field observation, meeting 
attendance, review of payment applications, 
punch list preparation, and closeout 
documentation.
Landscape Architecture & 
Site Amenities
BSC’s landscape architects can support 
Granby’s park, school, and recreation facility 
improvements by helping create functional, 
attractive, and maintainable public spaces. For 
athletic fields, courts, restroom facilities, and 
park improvements, landscape architecture 
can help integrate circulation, planting, seating, 
fencing, signage, shade, site furnishings, and 
user comfort into the overall design.
Our landscape architects work closely with 
engineers and environmental staff to develop 
site solutions that respond to grading, 
drainage, utilities, accessibility, maintenance, 
and community use. 
This coordination is particularly important for 
recreation facilities, where the quality of the 
user experience depends on more than the 
primary athletic surface or structure.
Potential landscape architecture support for 
Granby may include conceptual site planning, 
planting design, site furnishings, pedestrian 
connections, visual screening, restoration 
planting, park amenity planning, and 
coordination of improvements with the 
surrounding school or park setting.
BSC designed Bushnell 
Gardens in Hartford, CT, as 
an accessible civic landscape 
with resilient plantings, shaded 
seating, improved drainage, 
and enhanced pedestrian 
connections.
Avon High School Athletic Complex, Avon, CT
Bushnell Gardens, Hartford, CT
NARRATIvE  / 13

Page 237

Permitting & Environmental Support
BSC’s technical expertise is complemented by 
a strong understanding of local, state, and 
federal regulatory processes. Our permitting 
specialists and environmental scientists 
routinely support municipal projects involving 
wetlands, stormwater, floodplain 
considerations, site development approvals, 
erosion control, and environmental resource 
coordination.
For Granby, permitting needs may vary by task 
order. Athletic facility, park, restroom, drainage, 
utility, or sewer-related improvements may 
require coordination with local land use 
boards, wetlands agencies, health officials, 
building officials, or state and federal 
regulatory agencies. BSC can help identify 
permitting requirements early, define the 
documentation needed, prepare application 
materials, and support the Town through the 
review process.
Our permitting strategy focuses on five  
core steps:
 ƒ Engage regulatory authorities early
 ƒ Define permitting parameters and project 
constraints
 ƒ Design with permitting requirements in mind
 ƒ Submit complete and clear application 
materials
 ƒ Support the application through approval 
and implementation
This approach helps reduce delays, clarify 
expectations, and align design decisions with 
regulatory requirements.
Environmental & Ecological Science
BSC’s environmental and ecological science 
staff can provide as-needed support for 
projects involving wetlands, watercourses, 
habitat, floodplains, natural resources, or 
environmental permitting. This capability may 
be relevant for park improvements, drainage 
upgrades, utility projects, or other municipal 
infrastructure assignments where natural 
resource constraints are present.
Our environmental services include wetland 
delineation, resource area assessment, impact 
assessment, mitigation planning, permitting 
support, habitat assessment, construction-
period environmental compliance, and long-
term monitoring, where required. Our scientists 
coordinate closely with engineers and 
landscape architects so that environmental 
considerations are integrated into the design 
from the outset.
For Granby’s on-call contract, this in-house 
capability gives the Town access to 
environmental expertise when needed without 
requiring a separate procurement or consultant 
team for routine resource-related assignments.
BSC Permitting Team
14 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP

Page 238

Commitment to Responsive  
On-Call Service
BSC understands that successful on-call 
engineering requires more than technical 
capability. It requires responsiveness, clear 
communication, practical judgment, and the 
ability to support Town staff across multiple 
assignments with varying priorities. We will 
work with Granby to define each task order 
clearly, confirm schedule and budget 
expectations, assign the right staff, and 
maintain consistent communication from 
authorization through completion.
Our goal is to serve as a dependable extension 
of Town staff, providing engineering services 
that are technically sound, cost-conscious, 
constructible, and aligned with Granby’s 
municipal priorities.
RELEvANT PROJECTS
On the following pages, we have included 
project sheets highlighting BSC’s recent, 
relevant experience providing municipal clients 
with on-call engineering services and athletic 
field design. These projects demonstrate our 
team’s ability to provide the Town of Granby 
with the high-quality, responsive service 
needed for this assignment.
REFERENCES
Suzanne Choate, PE
Town Engineer
Town of Windsor
 860-285-1804
 choate@townofwindsorct.com
 275 Broad Street, Windsor, CT 06095
Mark Moriarty
Director of Public Works
City of New Britain
 860-826-3374 
 mmoriarty@ch.ci.new-britain.ct.us
 27 West Main Street,  
 New Britain, CT 06051
Mansi Doshi
Civil and Environmental Engineer,  
Project Manager
City of Waterbury Development Corporation
 203-346-2607 ext. 7285 
 doshi@wdconline.org
 83 Bank Street, 3rd Floor,  
 Waterbury, CT 06702
Adam Kessler, PE
Deputy Town Engineer
Town of Simsbury 
 860-658-3260 
 akessler@simsbury-ct.gov
 933 Hopmeadow Street,  
 Simsbury, CT 06070
BSC partnered with the Town of 
Simsbury to modernize Simsbury  
High School’s stadium complex with 
multi-sport synthetic turf and new 
track surfacing. 
Simsbury High School, Simsbury, CT
NARRATIvE  / 15

Page 239

BSC was selected by the Connecticut Metropolitan Council of 
Governments (MetroCOG) to provide on-call consulting services for the 
member Towns of Bridgeport, Easton, Fairfi eld, Monroe, Stratford and 
Trumbull. The on-call service agreement allows these towns to reach out 
directly to BSC to provide engineering, planning, and survey services 
without going through the full RFQ/RFP procurement process.  
BSC has the staffi  ng and services to assist the member towns with small 
and large projects as they arise, and we will work closely with the Town 
staff  to meet the community’s needs.  
ON-CALL CONSULTING SERvICES
BRIDGEPORT, EASTON, FAIRFIELD, MONROE, STRATFORD, & TRUMBULL, CT
CLIENT 
Connecticut 
Metropolitan
Council of Governments
SERvICES 
Planning
Civil & Transportation 
Engineering
Permitting & Regulatory 
Compliance
Ecological Science
Landscape Architecture
GIS & Land Surveying
16 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP

Page 240

BSC has been providing on-call engineering services to the City of New 
Britain, CT. Under this contract, BSC has provided the city with 
comprehensive engineering services to eff ectively and economically 
develop, utilize, and maintain its varied infrastructure and facility assets. 
BSC’s range of services under this on-call contract includes surveying, 
permitting, engineering analysis and design, preparation of construction 
documents, and construction administration. 
Under its most recent assignment, BSC completed an engineering study 
of Barbour Road to consider a potential realignment to eliminate a 
dangerous curve. As part of the study, BSC evaluated conceptual 
roadway alignments, developed preliminary concept plans and roadway 
cross-sections, completed a utilities infrastructure analysis, natural 
resources evaluation (wetlands and ecological), preliminary culvert 
hydraulic analysis, and construction cost estimating.
BSC recently assisted the City of New Britain with the preparation of a 
LOTCIP application in support of West Main Street between Corbin 
Avenue and North Mountain Road. This application is to support traffi  c 
calming, enhanced pedestrian access and vehicle access control to the 
various businesses along the corridor.
ON-CALL ENGINEERING SERvICES
NEW BRITAIN, CT
CLIENT 
City of New Britain
SERvICES 
Civil Engineering
Roadway Engineering
Environmental 
Permitting
Construction 
Administration
Infrastructure Analysis
NARRATIvE  / 17

Page 241

The Town of Simsbury contracted with BSC to provide on-call 
engineering services. These services may include third-party review 
services of proposed development projects, intersection safety 
improvements, survey services, bridge inspection and improvement 
services, dam safety inspection and improvement services. 
Most recently, BSC has provided construction review services for a 
local housing development, survey services for a town-owned parcel 
in Tariff ville and the Latimer Lane proposed sidewalks, and a signal 
redesign at Station Street in the town center including coordination 
with Town staff  and CTDOT. 
ON-CALL ENGINEERING SERvICES
SIMSBURY, CT
CLIENT 
Town of Simsbury
SERvICES
Civil Engineering
Traffi  c Engineering
Land Surveying
Planning
18 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP

Page 242

BSC is providing the Town of Waterford on-call consulting engineering 
services to help support projects throughout the Town. Our team has 
been working closely with the Department of Public Works to provide 
engineering studies and designs that will support the health and safety 
of the community. Being a coastal town, Waterford has a signifi cant need 
to address coastal bank stabilization and resiliency through additional 
armoring and the development of living shoreline protection. 
Our most recent assignments include the analysis and design of 
coastal embankment stabilization along Old Norwich Road and 
Niantic River Road. Other assignments include a new culvert and 
roadway profi le alignment modifi cations of Oswegatchie Road to limit 
coastal fl ooding and the analysis of water line settlements within the 
Beacon Hill neighborhoods.
ON-CALL ENGINEERING SERvICES
WATERFORD, CT
CLIENT 
Town of Waterford
SERvICES 
Civil Engineering
Climate Resilience
Ecological Science
Coastal
NARRATIvE  / 19

Page 243

BSC provided on-call engineering support to the Town of Windsor, 
assisting the Town Engineer and supporting the Planning and Zoning 
Department with development reviews and inspections. BSC conducted 
drainage, traffi  c, and other reviews for site plans and permit applications, 
prepared reports, and participated in construction inspections. 
BSC provided engineering design services for municipal buildings, 
roads, and infrastructure, including construction documents, 
specifi cations, and project oversight for the Department of Public Works. 
Additionally, BSC supported permitting and bidding processes, ensuring 
compliance with Town standards and providing engineering support for 
community infrastructure projects.
ON-CALL ENGINEERING SERvICES
WINDSOR, CT
CLIENT 
Town of Windsor
SERvICES 
Drainage, Traffi  c, & 
Site Plan Reviews
Civil Engineering
Permitting & 
Bidding Support
Construction Inspections
20 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP

Page 244

BSC provided design, engineering, bidding assistance, and construction 
administration services for the Hartford Public High 
School Athletic Facility in Hartford, CT, for the conversion 
of their stadium natural grass fi eld to a synthetic turf fi eld along with 
a new running track, fi eld events, and associated facility upgrades. 
The new layout accommodates a new multi-sport synthetic turf fi eld 
for use by football, soccer and lacrosse within a new 8-lane competitive 
running track. Improvements also included new track events and sports 
fi eld, as well as pedestrian lighting.
BSC’s team provided design services for the fi eld layouts, obtained 
local permitting approvals, and developed an opinion of probable 
construction costs. BSC assisted the city through the construction 
phase of the project, including submittal reviews, attendance at 
owner meetings, site visits and reports, and project close-out 
assistance. Upon completion, the fi eld was tested following 
the Synthetic Turf Councils guidelines for fi eld performance.
ATHLETIC FACILITY IMPROVEMENTS 
AT HARTFORD PUBLIC HIGH SCHOOL
HARTFORD, CT
CLIENT 
City of Hartford
SERVICES 
Survey
Programming &
Material Selection
Synthetic Turf 
Field Design
Running Track Design
Cost Estimating
Public Bidding
Construction 
Phase Services
NARRATIvE  / 21

Page 245

BSC provided design, permitting and construction administration 
services for the conversion of existing natural grass baseball and 
softball fi elds to synthetic turf along with new dugouts, fencing, ball 
safety netting and site electrical upgrades. The new facility includes 
a baseball and softball turf system and a multi-use fi eld overlay in the 
outfi eld. The design and permitting was completed within three months 
so that construction could start prior to the new school year.
BASEBALL AND SOFTBALL FIELD IMPROVEMENTS 
JONATHAN LAW HIGH SCHOOL
MILFORD, CT
CLIENT 
City of Milford
SERVICES 
Permitting 
Construction 
Administration 
Synthetic Turf 
Field Design
2021 AMERICAN SPORTS BUILDERS 
ASSOCIATION /parenleft.caseASBA/parenright.case AWARD
22 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP

Page 246

BSC provided design, engineering, bidding assistance, and construction 
administration services for Avon High School Athletic Facility. The 
project involved the conversion of the stadium’s natural grass fi eld to a 
synthetic turf fi eld along with a new running track, fi eld events, and 
associated facility upgrades. 
The new layout accommodates a new multisport synthetic turf fi eld for 
use by football, soccer, lacrosse and fi eld hockey within an eight-lane 
competitive running track. Improvements also included new track 
events, pedestrian accessibility, storage and sports fi eld and pedestrian 
lighting.
The BSC team provided master planning for the fi eld layouts, obtained 
local permitting approvals, and developed an opinion of probable 
construction cost. BSC provided construction phase services, including 
submittal reviews, attendance at owner meetings, site visits and reports, 
and project close-out assistance. 
The fi eld was also tested in accordance with Synthetic Turf Council’s 
guidelines for fi eld performance, and was completed in September 
2019.
CLIENT 
Town of Avon
SERvICES 
Master Planning
Survey
Programming &
Material Selection
Synthetic Turf 
Field Design
Running Track Design
Public Bidding
Construction
Phase Services
AvON HIGH SCHOOL ATHLETIC COMPLEX
AVON, CT
2021 AMERICAN SPORTS BUILDERS 
ASSOCIATION (ASBA) AWARD
NARRATIvE  / 23

Page 247

The Town of Windsor’s Athletic Field Master Plan recommended 
improvements to the layout, grading, drainage, turf establishment, and 
amenities at the heavily used fi elds at Sage Park. BSC was brought on 
board by the Town of Windsor to provide a full survey of the 12-plus acre 
park and delineation of the environmental resource areas bordering the 
fi eld locations. BSC prepared multiple layouts to accommodate three 
multi-use fi elds for football, soccer, and lacrosse as well as softball and 
baseball diamonds. In addition to the playing fi elds, BSC designed a 
paved walking trail around the perimeter of the park and a new well 
system for fi eld irrigation. Proper grading and an extensive underdrain 
system will help the fi elds drain properly and promote healthy growth of 
the turf. 
BSC accelerated the design of the project to allow an early start to the 
construction phase and allow additional time for the new turf to become 
well established before use by the community. During construction, BSC 
provided construction administration services to support the Town staff . 
These services included weekly monitoring of the construction progress 
and inspections of the erosion control measures.
SAGE PARK ATHLETIC FIELD IMPROvEMENTS
WINDSOR, CT
CLIENT 
Town of Windsor
SERvICES 
Surveying
Civil Engineering
Landscape Architecture
Wetland Delineation
Permitting
Construction 
Administration
24 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP

Page 248

BSC provided planning, design, and construction support for the Clover 
Street Park Cricket Field Improvements project in Windsor, CT. 
Completed in 2025, the project expanded the Town’s recreational 
off erings to support the growing popularity of cricket while improving 
the park’s overall function and usability.
Improvements included a regulation cricket pitch with specialized turf 
materials and subgrade preparation designed for performance and 
durability. BSC also addressed grading and drainage to improve fi eld 
conditions and support long-term use, along with outfi eld and perimeter 
upgrades coordinated with existing park amenities.
Working closely with Town staff  and stakeholders, BSC developed a 
practical, sustainable design that supports organized competition, 
informal play, and broader community use. The completed fi eld provides 
a high-quality recreational asset that expands athletic opportunities and 
supports more inclusive programming.
CRICKET FIELD AT CLOvER STREET PARK
WINDSOR, CT
CLIENT 
Town of Windsor
SERvICES
Land Surveying
Civil Engineering
Athletic Facility Design
Construction 
Administration
NARRATIvE  / 25

Page 249

Working as a subconsultant to the project architect, BSC provided 
athletic facility design and engineering services for the conversion of a 
clay softball infi eld to synthetic turf. The project goals were to eliminate 
maintenance of the clay infi eld, meet current NCAA standards, and 
improve player safety.
The project also included the addition of covered dugouts, portable 
press box, new backstop, bullpens, and fencing. To improve player 
safety and meet current NCAA fi eld requirements, the existing fi eld was 
moved seven feet to maximize foul territory, remove retaining walls from 
the fi eld of play, provide expanded covered dugouts and home and 
visitor bullpens, and meet minimum outfi eld-distance requirements. 
The synthetic turf system was selected to mimic a more natural ball 
reaction and complement the existing, previously installed synthetic turf 
outfi eld. The University took advantage of the synthetic turf surface to 
add school branding with inlaid logos.
WOMEN’S SOFTBALL FIELD IMPROVEMENTS
SALEM STATE UNIVERSITY
SALEM, MA
CLIENT 
Salem State University
SERVICES 
Athletic Facility Design
Civil Engineering
Construction 
Administration
26 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP

Page 250

 
 
 
 
YEARS OF EXPERIENCE 
32 
EDUCATION 
BS, Civil Engineering,  
Union College 
REGISTRATIONS 
Professional Engineer 
• CT #20662  
• MA #49276 
LEED Accredited Professional 
AFFILIATIONS  
• American Society of  
Civil Engineers 
• U.S. Green Building Council 
Robert 
Newton, PE, LEED AP 
Senior Civil Engineer 
Vice President 
MEET ROB 
Rob has extensive civil engineering experience, especially in the 
areas of site and roadway design, hydraulic analyses, and permitting 
support for municipalities, private entities, and government 
organizations, including both the Connecticut Department of 
Transportation (CTDOT) and Massachusetts Department of 
Transportation (MassDOT). Rob is well-versed in all aspects of site 
and roadway design, including site planning, drainage design, 
stormwater management, site utility design, sedimentation, and 
erosion control plans.  
Accustomed to leading teams of engineers, planners, surveyors, and 
scientists in the delivery of cohesive and exemplary projects, Rob 
manages to combine his technical expertise with best management 
practices. He has also developed flood protection systems along 
several major bodies of water within the state, including the 
Connecticut, Hockanum, and Westfield Rivers.   
PROJECT EXPERIENCE HIGHLIGHTS 
Simsbury On-Call Engineering Services, Simsbury, CT 
Project Manager 
Provided management for the on-call services which required 
coordination with the client, oversight of design professionals, and 
overall QA/QC services. Provided the Town with construction 
management support for bond recording, drainage design, and traffic 
signal design services for the intersection of Station Street and 
Hopmeadow Street.  
Baseball and Softball Field Improvements at Jonathan Law  
High School, Milford, CT 
Civil Engineer 
Responsible for design, permitting, and construction administration 
for the conversion of existing natural grass baseball and softball fields 
to synthetic turf along with new dugouts, fencing, ball safety netting, 
and site electrical upgrades. The new facility includes a baseball and 
softball turf system tuned for the respective sports performance 
requirements. There is also a multiuse field overlay in the outfield to 
accommodate Junior Varsity play and practices. Played a large role in 
reviewing the project as well as troubleshooting challenging 
components.
NARRATIvE  / 27

Page 251

Robert Newton, PE, LEED AP 
Region 16, Woodland High School  
Track and Field, Beacon Falls, CT 
Civil Engineer 
Supported design, permitting, and construction 
administration for the new track and field complex 
replacing the existing natural grass field with a 
synthetic turf. Design services including grading, 
drainage, and site infrastructure. Coordinated with 
the project team to incorporate ADA accessibility 
and pedestrian circulation, while meeting NFHS 
standards. 
East Hartford On-Call Engineering Services, East 
Hartford, CT 
Project Manager 
Responsible for managing various engineering 
projects for over a decade. Designed to support 
town staff, these services included traffic 
management, GIS mapping update, environmental 
studies, pavement evaluation, FEMA map revisions, 
geotechnical services, engineering reviews, utility 
design, structural inspections, hydraulic analyses, 
flood protection system design and maintenance, 
surveying, and construction engineering/inspection. 
Oversaw all assignments associated with this 
contract. Project responsibilities included 
coordinating with the client, securing and 
monitoring all subconsultants, and providing overall 
project management and QA/QC services. He 
oversaw survey efforts and provided roadway, 
traffic, utility and site/civil engineering, including 
hydraulics and hydrology, for a variety of projects, 
including: 
 Orchard Street Drainage Improvements 
 Pedestrian Foot Bridge Replacement, Burnside 
Avenue to Labor Field 
 Governor Street Reconstruction, Geotechnical 
and Traffic Engineering, Retaining Wall Design 
 Traffic Counts/ADT Development 
 Bridge Scour Evaluation 
 Stormwater Pollution Prevention Plan for 
Transfer Station 
 Flood Protection System Inspection and 
Repairs 
 LOMR Request Preparation for FEMA, Hillside 
Street/Burnside Avenue Parcel 
Kelly Martin Tighe Field Improvements,  
Milford, CT 
Civil Engineer 
Responsible for the design, permitting, and 
construction administration services for the 
conversion of a natural grass soccer field to two 
synthetic turf multiuse fields complete with fencing, 
ball safety netting, sidewalks, and wetland 
restoration plantings. The team was challenged to 
fit the desired program by existing soil conditions 
and surrounding wetlands. The design team’s 
solution met the defined program with minimal 
impact to surrounding wetlands, which required 
local and federal permitting and long-term stability 
of the underlying soils.  
Connecticut Department of Construction Services 
(CT-DCS) On-Call Engineering Services, Various 
Locations, CT 
Project Manager 
Responsible for the management of the State’s 
surplus property program. Tasks included 
identifying which services would be required to 
ensure proper sale of the property to an outside 
interest. Assignments included: 
 H.H. Ellis Technical High School Track 
Replacement and Drainage Improvements 
 Connecticut Valley Hospital Storm and Sewer 
System Evaluation 
 Connecticut Army National Guard – Camp 
Hartell Sewer Improvement 
 Uncas-on-Thames Sewer Evaluation 
 Connecticut Army National Guard – Camp 
Hartell General Infrastructure Improvements 
 Connecticut State Library/Supreme Court 
Drainage Improvements 
 Garner Correctional Institution Water System 
Improvements 
Tennis Courts at Renbrook School, 
West Hartford, CT 
Civil Engineer 
Supported design and permitting for four post-
tensioned concrete tennis and pickleball courts, 
including grading, drainage, and site layout. 
Coordinated with the team to advance the site 
development program and secure local approvals, 
while incorporating player and spectator amenities. 
New Britain On-Call Engineering Services,  
New Britain, CT 
Project Manager 
Provided management for the on-call services 
which required coordination with the client, 
securing and monitoring all subconsultants, and 
overall QA/QC services. Provided the City with pre-
design services for the West Street Streetscape 
improvements for local transportation grant 
application.    
28 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP

Page 252

 
 
 
 
YEARS OF EXPERIENCE 
12 
EDUCATION 
BS, Civil Engineering 
University of Connecticut 
REGISTRATIONS 
Professional Engineer 
• CT #34678 
• MA # 57373 
• RI #15358 
AFFILIATIONS  
• American Society of  
Civil Engineers 
Matt 
Stephan, PE 
Civil Engineer  
Senior Associate 
MEET MATT 
Matt is a civil engineer with extensive experience in site and 
infrastructure design, including erosion and sedimentation control, 
grading and drainage, utilities, hydrologic and hydraulic analysis, 
stormwater management, stream and culvert modeling, permitting, 
and construction support. His work spans public and private projects 
ranging from roadway and bridge improvements to school, park, 
housing, and municipal site development. He has prepared hydraulic 
models and reports, supported local, state, and federal permitting, 
and provided construction administration and field coordination, 
bringing a practical understanding of how projects move from 
analysis and design through implementation.   
PROJECT EXPERIENCE HIGHLIGHTS 
Baseball and Softball Field Improvements,  
Jonathan Law High School, Milford, CT 
Project Engineer 
Prepared grading, drainage, and utility design for conversion to 
synthetic turf fields with new dugouts, fencing, netting, and electrical 
upgrades. Led stormwater management effort and preparation of 
Stormwater Report to support local land use permitting. 
Woodland High School Track and Field, Beacon Falls, CT 
Project Engineer 
Prepared design, permitting, and construction documents for 
replacement of the existing running track and conversion of the 
natural grass infield to synthetic turf, including drainage, erosion 
controls, and stormwater management design to support local 
permitting efforts. Provided construction administration support 
throughout construction.  
Crosby High School Athletic Field and Track Improvements, 
Waterbury, CT 
Civil Designer 
Responsible for engineering design for the Crosby High School 
Athletic Field and Track Improvements project. The project involved 
the installation of an artificial turf field; an alternate design for a sod 
field including regrading and an irrigation system; installation of an 
additional track lane; field drainage improvements; regrading, paving 
and surfacing of the existing track and track/field event stations; 
installation of new field and track event equipment; and fencing 
improvements. 
NARRATIvE  / 29

Page 253

Matt Stephan, PE 
Athletic Field Renovations at Bloomfield High 
School, Bloomfield, CT 
Civil Designer 
Provided design services for the Athletic Field 
Renovations at Bloomfield High School project. 
Project tasks included resurfacing of the existing 
track, a new all-weather grass sports system, and 
new runways for pole vault, long/triple jump, and 
high jump. The engineering components included 
site demolition, erosion and sedimentation control, 
grading and drainage, and utility configuration.  
Plainville High School Field and Track 
Improvements, Plainville, CT 
Civil Designer 
Responsible for providing support for the 
installation of two artificial turf fields, regrading, 
paving, and surfacing of the existing track as well 
as new runways for pole vault, long/triple jump, and 
high jump. The engineering components included 
site demolition, erosion and sedimentation control, 
grading and drainage, and utility configuration.  
The Renbrook School Athletic Field 
Reconstruction, West Hartford, CT 
Project Engineer 
Prepared drainage and stormwater management 
design to support conversion of natural grass field 
to synthetic turf, with fencing, sidewalks, and 
parking. The design integrated the field into a 
historic landscape while addressing challenging 
topography, strict local stormwater standards, and 
poor geotechnical conditions, in coordination with 
the School, Town, and Kaestle Boos Associates. 
Tennis Courts at Renbrook School,  
West Hartford, CT 
Project Engineer 
Led grading, drainage, and utility design for 
construction of four post-tensioned concrete tennis 
and pickleball courts. Design challenges included 
ADA accessibility to the field over steep 
topography, strict local stormwater management 
standards, and poor geotechnical conditions. 
Design incorporated several LID features for 
stormwater management, including an infiltration 
basin and a dry water quality swale, in coordination 
with the School and Town. 
Improvements to Batterson Park, Farmington, CT 
Project Engineer 
BSC was retained by the City of Hartford to provide 
full site design services for the Improvements to 
Batterson Park in Farmington, CT. Closed to the 
public for a number of years, BSC worked closely 
with the City of Hartford, CT DEEP, Town of 
Farmington, and other stakeholders to prepare a 
design for a new park facility including paved 
parking for approximately 100 vehicles, public 
restroom building, maintenance building, walking 
trails and boardwalks, playground, splash pad, 
pavilion and picnic areas, a kayak launch at 
Batterson Park Pond, and stormwater management 
facilities. BSC was also responsible for leading the 
project through an aggressive permitting schedule, 
including local, state, and federal permit 
applications. BSC also provided construction 
administration services during construction, 
including shop drawing review and responses to 
Contractor RFIs.  
Northwest Catholic High School Breen Athletic 
Complex, West Hartford, CT 
Project Engineer 
Prepared design, permitting, and construction 
documents for a multi-sport synthetic turf complex, 
including grading, drainage, and site infrastructure. 
Coordinated with the project team to incorporate 
ADA accessibility, pedestrian circulation, and 
amenities such as bleachers, netting, and support 
facilities, while meeting NFHS standards, 
accommodating multi-season athletic use, and 
complying with strict local stormwater standards. 
Provided construction administration support 
throughout construction. 
L.P. Wilson Field Improvements, Windsor, CT 
Civil Designer 
Provide design services for the L.P. Wilson Field 
Improvements project. The project involved the 
installation of multiple artificial turf fields. The 
engineering component included site demolition, 
erosion and sedimentation control, and grading and 
drainage. Additionally, the project required a 
Stormwater Pollution Control Plan to be prepared 
and submitted to the Department of Energy and 
Environmental Protection. 
Additions and Renovations to Chamberlain 
Elementary School, New Britain, CT 
Project Engineer 
Responsible for site civil engineering services 
associated with the design of a renovation of the 
existing school. Design services included 
preparation of erosion and sedimentation control 
plans, site utility demolition, site grading, site 
drainage, and utilities, as well as coordination with 
the architect and other members of the design 
team. The site stormwater management systems 
were designed in accordance with local and state 
requirements and detailed in a Stormwater 
Management Report.  
 
30 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP

Page 254

 
 
 
 
YEARS OF EXPERIENCE 
11 
EDUCATION 
MS, Transportation Engineering, 
Northeastern University 
BS, Civil Engineering, 
Northeastern University 
REGISTRATIONS 
Professional Engineer  
• MA #55337  
• CT #38141 
• NH #17943 
• RI #14156  
• ME #18951 
• VT #18.0135752 
Professional Traffic Operations 
Engineer #4994  
CERTIFICATIONS 
• IMSA Traffic Signal Technician  
#135570 (2024) 
• OSHA Construction  
Safety & Health 
AFFILIATIONS  
• Institute of Transportation 
Engineers 
• Women's Transportation 
Seminar 
 
Amy 
Allen, PE, PTOE 
Transportation Project Manager 
Senior Associate 
MEET AMY 
Amy is a transportation engineer with 11 years of experience in 
roadway design, traffic analysis, roadway safety, signal design, and 
traffic management planning. Her background includes capacity 
analysis, crash analysis, Road Safety Audits, Intersection Control 
Evaluations, traffic impact studies, signal timing and layout, signing 
and pavement marking design, and traffic management planning for 
roadway, intersection, bridge, and multimodal improvement projects.  
AMY HAS SUPPORTED A WIDE RANGE OF PUBLIC AND 
PRIVATE SECTOR ASSIGNMENTS, CONTRIBUTING 
TECHNICAL ANALYSIS, DESIGN DEVELOPMENT, AND 
IMPLEMENTATION SUPPORT TO IMPROVE SAFETY, 
OPERATIONS, AND MULTIMODAL ACCESS.  
PROJECT EXPERIENCE HIGHLIGHT: 
MassDOT, Broadway Reconstruction, Malden, MA 
Lead Traffic Engineer  
Project consists of the design and reconstruction of a 1.6-mile-long 
segment of Broadway from the Everett City Line to the Melrose City 
Line. The project includes the complete streets design of the 
roadway, including improved pedestrian and bicycle safety and 
access. Responsible for overseeing the Intersection Control 
Evaluation (ICE) process which determines the optimal traffic control 
strategy at three project intersections to balance multimodal safety, 
traffic operations, lifecycle cost, and environmental impacts. She is 
also currently overseeing a Road Safety Audit (RSA) for the corridor, 
which includes preparing an in-depth crash analysis, convening 
various stakeholders such as state and local officials, first responders, 
and FHWA representatives to visit the site and identify safety 
concerns and potential countermeasures. 
MassDOT, Local Bottleneck Reduction Grant Program,  
Various Locations, MA 
Project Manager/ Lead Traffic Engineer 
The MassDOT Local Bottleneck Program was established to help 
municipalities address congestion on locally owned roadways. BSC 
supports this program by reviewing grant applications, coordinating 
with municipalities, obtaining traffic signal timings, observing traffic 
operations, evaluating existing traffic signal equipment and 
operations, and developing improvement plans to alleviate traffic 
congestion and enhance safety at various intersections. Responsible 
for overseeing the design of proposed improvements and 
coordinating with clients and MassDOT. 
NARRATIvE  / 31

Page 255

Amy Allen, PE, PTOE 
Downtown Streetscape Improvements,  
Ashland, MA 
Transportation Designer 
Responsible for the design review and feasibility 
study for the Town of Ashland’s Downtown 
Streetscape Improvement project. Contributed the 
feasibility analysis for pedestrian access and 
walkability in the downtown area.  
Design of Traffic Signals at the Intersection of 
River Street, Farwell Street, and Seyon Street, 
Waltham, MA 
Traffic Analyst  
Supported the design services for the 
reconstruction of the River/Farwell/Seyon Street 
intersection. BSC is replacing the existing traffic 
signal equipment, which is outdated and does not 
meet current MUTCD standards. The design will 
also interconnect the adjacent Willow/River Street 
intersection and have all left turning lanes operate 
under a protected-permitted phase. 
Quincy Center Redevelopment, Quincy, MA 
Traffic Analyst 
Responsible for the preparation of a traffic 
evaluation for the redevelopment of Quincy Center. 
The evaluation provided a revised analysis of a 
Draft Environmental Impact Report based on a new 
development program. BSC estimated trips to be 
generated by the project, distributed the project 
trips onto the roadway network, and performed 
capacity analyses at the nineteen (19) study area 
intersections. BSC evaluated future traffic 
conditions under a 10-year planning horizon. 
Tremont Crossing, Boston, MA 
Traffic Analyst 
Responsible for the preparation of a Draft Project 
Impact Report for the development of a large 
mixed-use development in the Roxbury 
neighborhood of Boston. BSC prepared the 
transportation section of this report, comprised of a 
comprehensive traffic and parking analysis which 
examined traffic, parking, public transportation, 
pedestrian access, and loading activities in the 
vicinity of the project. Trip generation estimates, 
transportation impacts, capacity analysis, shared 
parking analysis, signal warrant analysis, and 
transportation demand management measures 
were also included.  
 
 
 
Massachusetts Avenue Improvements,  
Lexington, MA 
Transportation Designer  
Responsible for the design of roadway and 
intersection improvements along the 
Massachusetts Avenue corridor between Pleasant 
Street and Marrett Street. This included the design 
of signal layout and timing plans, in addition to 
signing and pavement markings for vehicles, 
bicycles, and pedestrians. 
Fellsway East and Highland Avenue Intersection 
Improvements, Malden, MA 
Traffic Analyst 
Responsible for the preparation of a traffic study 
and conceptual designs for the intersection of 
Fellsway East and Highland Avenue. This 
intersection experiences a high number of crashes, 
which prompted the Department of Conservation 
and Recreation to find ways to improve safety at 
this key location. The traffic study identified the 
existing operational and safety issues at the 
intersection and discussed conceptual design 
alternatives. It involved the collection and analysis 
of traffic volumes and crash data, intersection 
capacity analyses, development of potential 
intersection improvement alternatives, and 
recommendation of short and long-term 
improvements. 
881 and 891 Route 28 (Main Street),  
South Yarmouth, MA 
Traffic Analyst  
Responsible for the preparation of a Traffic Impact 
Study for a mixed-use commercial/ business/ 
residential development. The potential 
development proposed to construct 120 residential 
units and 18,000 SF of combined retail and office 
space on lots was occupied by the former Cavalier 
Motor Lodge and Bass River Motel. The study 
included a review of existing traffic and roadway 
conditions, as well as a review of the recent history 
of crashes at study area intersections. It identified 
background traffic growth for study area roadways, 
estimated additional traffic generated by the 
proposed development, and evaluated traffic 
impacts due to project-generated traffic. The 
impacts of additional traffic associated with this 
expansion were evaluated under a five-year 
planning horizon. 
 
 
 
32 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP

Page 256

 
 
 
 
YEARS OF EXPERIENCE 
20 
EDUCATION 
BS, Landscape Architecture,  
University of  
Massachusetts Amherst 
AS, Landscape Contracting, 
University of  
Massachusetts Amherst 
REGISTRATIONS 
Licensed Landscape Architect 
• CT #1224 
CERTIFICATIONS 
• OSHA Construction  
Safety and Health  
• CPSI Certified Playground  
Safety Inspector 
AFFILIATIONS  
• American Society of  
Landscape Architects 
• CT Chapter-American Society of 
Landscape Architects 
• CT Recreation and  
Park Association 
• American Sports  
Builders Association 
Jesse 
Harris, PLA, CPSI  
Senior Landscape Architect 
Senior Associate 
MEET JESSE 
Jesse is a landscape architect with experience in the areas of athletic 
facility assessment and design, landscape architecture, urban design, 
planning, and project management. His wide range of experience 
encompasses all facets of site development including but not limited 
to site assessment, design, specification writing, contract document 
preparation and management of design teams. Jesse's knowledge of 
state and local permitting processes plays an integral role in his 
understanding of the entire process from schematic design through 
construction administration.  
PROJECT EXPERIENCE HIGHLIGHTS 
Wilby High School Athletic Complex, Waterbury, CT 
Landscape Architect 
Responsible for site evaluation/needs assessment and conceptual 
design services for a multi-field athletic complex. BSC conducted a 
comprehensive facility evaluation and needs assessment, 
programmed the new facilities with the project stakeholders, and 
prepared conceptual designs, narrative summaries, and cost 
estimates for two scenarios. The designs included natural and 
synthetic turf fields, lighting, enhanced athlete/spectator access and 
handicapped accessibility, stormwater management, new parking 
facilities, restrooms, concessions, and storage. 
Athletic Facility Improvements, Hartford Public High School, 
Hartford, CT 
Project Manager, Landscape Architect 
Provided architect support and management for design, engineering, 
bidding assistance, and construction administration services for the 
Hartford Public High School Athletic Facility in Hartford, Connecticut 
for the conversion of their stadium natural grass field to a synthetic 
turf field along with a new running track, field events, and associated 
facility upgrades. The new layout accommodates a new multi-sport 
synthetic turf field for use by football, soccer, and lacrosse within a 
new 8-lane competitive running track. Improvements also included 
new track events and sports field and pedestrian lighting. Led a team 
of professionals that provided design services for field layouts, local 
and federal permitting approvals, and development of opinion of 
probable construction costs. Upon selection and award of a 
contractor, BSC will assist the city through the construction phase of 
the project, including submittal reviews, attendance at owner 
meetings, site visits and reports, and project close-out assistance. 
NARRATIvE  / 33

Page 257

Jesse Harris, PLA, CPSI 
O’Brien Stadium and Windsor High School 
Athletic Facility, Windsor, CT 
Landscape Architect 
Responsible for design and construction oversight 
of renovations to the athletic facility at the O’Brien 
Stadium Field. The fully renovated facility includes a 
new competitive running track, track & field events, 
a multi-purpose synthetic turf field, a natural grass 
practice football field, a press box, home and away 
bleachers, a multi-sport scoreboard, walkways, 
fencing, and miscellaneous improvements to the 
site. Led the project team through programming 
with the Athletic Director and Town stakeholders, 
local permitting, and a series of Town meetings, 
ultimately gaining approval of the project funding at 
a Town wide vote. 
Wilson Gateway Park, Windsor, CT 
Landscape Architect 
Responsible for the conceptual design and general 
design oversight throughout the project while 
maintaining design integrity. The project aimed to 
redevelop an open parcel of land in an 
underserved neighborhood. The design provides 
parking, a new inclusive playground, a meadow 
glade, plaza areas, a grand lawn with a large 
pavilion and concert space, and public restrooms.  
Crosby High School Athletic Facility,  
Waterbury, CT 
Landscape Architect 
Responsible for the reconstruction of Crosby High 
School’s track and field complex. The scope of 
work included widening the existing running track 
to allow a full-size soccer field on the track interior 
as well as converting the interior field to synthetic 
turf. The scope of work included design, permitting 
and construction oversight for a new eight-lane, 
urethane surfaced running track, Installation of new 
drainage, a new synthetic turf field with resilient 
underlayment, new scoreboards, and amenities as 
well as the design of a new concessions building 
and entry ‘portal.’ 
Baseball and Softball Field Improvements at 
Jonathan Law High School, Milford, CT 
Project Manager 
Responsible for managing the design, permitting 
and construction administration for the conversion 
of existing natural grass baseball and softball fields 
to synthetic turf along with new dugouts, fencing, 
ball safety netting and site electrical upgrades. The 
new facility includes a baseball and softball turf 
system tuned for the respective sports performance 
requirements. There is also a multi-use field overlay 
in the outfield to accommodate Junior Varsity play 
and practices. Led a multi-disciplined team of 
professionals to complete the design and 
permitting within three months so that construction 
could start prior to the new school year.  
Avon High School Athletic Facility Improvements, 
Avon, CT 
Project Manager, Landscape Architect 
Responsible for managing master planning and 
design services for the Avon High School Athletic 
Facility. The fully renovated facility includes a new 
competitive running track, track & field events, a 
multi-purpose synthetic turf field, walkways, 
fencing, and miscellaneous improvements to the 
site. Led the project team through final design, local 
permitting, and a series of Town meetings to place 
the project for town wide referendum vote.  
Regional School District 8, School Campus Study, 
Hebron, CT 
Landscape Architect 
Responsible for the assessment of the campus 
grounds, existing conditions and necessary 
improvements associated with parking, pedestrian 
accessibility, pavement, landscape architecture and 
athletic facilities. Assessed the condition of the 
existing landscape and assisted with the 
assessment of site building code issues and 
concrete condition as well as the running track, 
track and field events, field condition and various 
cost estimates.  
Lyman Hall High School Stadium Renovation, 
Wallingford, CT 
Landscape Architect 
Responsible for design and renovations of the 
Lyman Hall football stadium. BSC provided design 
of a new multi-sport synthetic turf system, a new 
and expanded running track, new track event 
areas, sports field lighting, team rooms, weight and 
training rooms, storage buildings, coach’s offices, 
and officials’ offices to increase the usability of their 
facility for high school and community sports 
organizations. 
Tennis Court Renovations at Cove Island Park, 
Stamford, CT 
Project Manager 
Responsible for the design and construction 
administration for renovations of asphalt tennis 
courts at Cove Island Park to post-tensioned 
concrete courts. The renovations included reclaim 
in place of the asphalt court surface, new fencing, 
ADA access improvements, striping for three tennis 
courts, and the addition of two pickleball courts. 
34 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP

Page 258

 
 
 
 
YEARS OF EXPERIENCE 
11 
EDUCATION 
BS, Landscape Architecture, 
University of Rhode Island 
REGISTRATIONS 
Registered Landscape Architect 
• CT #1438 
CERTIFICATIONS 
• FAA Certified Remote Pilot 
• OSHA Construction  
Safety and Health 
AFFILIATIONS  
• American Society of  
Landscape Architects 
• CT Chapter American Society of 
Landscape Architects 
Rachel 
Salch, PLA  
Landscape Architect 
Associate 
MEET RACHEL 
Rachel is a landscape architect with involvement in projects including 
site analysis and design, master planning, site plan development, 
landscape planting design, construction document development, and 
construction administration. She has worked on a variety of projects 
throughout her career, which has expanded her knowledge base and 
professional skills. Rachel has been heavily involved in the design 
and oversight of construction for many projects throughout her 
career, specializing in parks, campuses, and public spaces. She has 
also been learning the craft of cemetery design, athletic facilities, and 
other niche practices. 
Rachel uses her skills across digital programs and photography to not 
only be an integral part of the design team, but to be able to bring life 
and color into the design as it transforms from conceptual idea to part 
of reality. Rachel is also an experienced and certified drone pilot, 
which she uses for photography throughout the design process and 
site analysis. 
PROJECT EXPERIENCE HIGHLIGHTS 
Athletic Facility Improvements, Hartford Public High School, 
Hartford, CT  
Landscape Architect 
Provided support for design, engineering, bidding assistance, and 
construction administration services for the Hartford Public High 
School Athletic Facility in Hartford, Connecticut for the conversion of 
their stadium natural grass field to a synthetic turf field along with a 
new running track, field events, and associated facility upgrades. The 
new layout accommodates a new multi-sport synthetic turf field for 
use by football, soccer and lacrosse within a new 8-lane competitive 
running track. Improvements also included new track events and 
sports field and pedestrian lighting.  
New Milford High School Athletic Facility, New Milford, CT  
Landscape Designer 
Prepared design plans for the New Milford High School athletic 
facility, including a main stadium synthetic turf field with an eight-lane 
track, new field lighting and events, a secondary multi-sport turf field, 
and ADA-accessible paths. Rachel helped advance the project from 
concept through construction documents and supported construction 
through field reports and meeting documentation. 
 
NARRATIvE  / 35

Page 259

Rachel Salch, PLA 
Avon High School Athletic Facility, Avon, CT  
Landscape Architect 
Responsible for master planning and design 
services for the Avon High School Athletic Facility. 
The fully renovated facility includes a new 
competitive running track, track & field events, a 
multi-purpose synthetic turf field, walkways, 
fencing, and miscellaneous improvements to the 
site. Rachel assisted through final design, local 
permitting, and a series of Town meetings to place 
the project for town wide referendum vote. She 
also helped with bid services and construction 
administration. 
Baseball & Softball Field Improvements at 
Jonathan Law High School, Milford, CT  
Landscape Architect 
Responsible for managing the design, permitting 
and construction administration for the conversion 
of existing natural grass baseball and softball fields 
to synthetic turf along with new dugouts, fencing, 
ball safety netting and site electrical upgrades. The 
new facility includes a baseball and softball turf 
system tuned for the respective sports performance 
requirements. There is also a multi-use field overlay 
in the outfield to accommodate Junior Varsity play 
and practices. Rachel was responsible for site 
analysis, conceptual design, cost estimation, 
construction documentation, bid services, and 
construction administration. 
Improvements at Kelly Martin Tighe Field,  
Milford, CT  
Landscape Architect 
Rachel was responsible for site analysis, conceptual 
design, cost estimation, construction 
documentation, bid services, and construction 
administration for the conversion of a natural grass 
soccer field to two synthetic turf multi-use fields. 
The team was challenged to fit the desired program 
by existing soil conditions and surrounding 
wetlands. The design team’s solution met the 
defined program with minimal impact to 
surrounding wetlands, which required local and 
federal permitting and long-term stability of the 
underlying soils.  
East Windsor Playground, East Windsor, CT  
Project Manager 
Rachel managed the design and permitting of a 
new playground at 27 Reservoir Road, including a 
new parking area and sidewalk for ADA access, 
shaded play equipment, and a seating area. She 
was responsible for data gathering, concept 
development, permitting, construction documents, 
and bidding. 
Orange Avenue Athletic Facility, Milford, CT  
Landscape Designer 
Responsible for site programing and preparation of 
design plans for the addition of two new multi-sport 
synthetic turf fields and adjacent parking lot for the 
City of Milford. Located adjacent to the YMCA, the 
new facility is already in a place where people are 
going for recreation. BSC was also responsible for 
assisting the Town with a land exchange with the 
neighboring YMCA in order to have the space 
necessary for the new facility. The agreement also 
included the redevelopment of the existing YMCA 
parking lot. Rachel worked on conceptual planning 
for the site and for the land swap as well as 
construction documents for the project. She also 
has been involved with the construction of the 
project through the preparation of field observation 
reports and meeting minutes.  
Regional School District 8 Athletic Facilities 
Master Plan, Hebron, CT  
Landscape Architect 
Provided architectural services for an athletic field 
needs assessment and master plan for the RHAM 
High School. Rachel contributed to the project with 
the development of site evaluation and condition 
assessments, assisted with recommendations and 
final master plan report and cost estimating. The 
plan will lay out short- and long-term capital 
improvements to the athletic facilities.  
Orton Field Improvements, Boston, MA  
Athletic Field Designer 
Responsible for design improvements to Orton 
Field in the south end of Boston. The improvements 
include the conversion of a natural grass field to 
synthetic turf, new four land running track, fencing, 
and walkways. The use of synthetic turf surfacing 
was chosen to improve durability and reduced 
maintenance for the heavily used park. Rachel 
assisted in the preparation of design details and 
technical specifications for the synthetic turf system 
and running track surface. 
Regional School District 8, School Campus Study, 
Regional School District 4 Athletic Facilities 
Master Plan, Deep River, CT  
Landscape Architect 
Provided architectural services for a comprehensive 
athletic field needs assessment and master plan for 
the Valley Regional High School and John Winthrop 
Middle School. Rachel contributed to the project 
with the development of field inventory and base 
mapping, site evaluation and condition assessment, 
assisted with recommendations and final master 
plan report and cost estimating. 
36 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP

Page 260

 
 
 
 
YEARS OF EXPERIENCE 
24 
EDUCATION 
MS, Marine Biology, Nova 
Southeastern University 
BS, Zoology, University of Florida 
REGISTRATIONS 
Professional Wetland Scientist, 
Society of Wetland Scientists 
• #2327 
CERTIFICATIONS 
• OSHA 10-Hour Construction 
Safety and Health 
• APM Project Management 
Master  
AFFILIATIONS  
• Connecticut Association of 
Wetland Scientists 
• Connecticut Power and  
Energy Society 
• Environmental Business Council 
of New England and Connecticut 
• Association of Massachusetts 
Wetland Scientists 
• Native Plant Trust, PCV  
Program Rare Plant  
Volunteer Surveyor 
Melissa 
Kaplan, PWS 
Licensing and Permitting Team Lead 
Vice President  
MEET MELISSA  
Melissa is a Professional Wetland Scientist and the Licensing and 
Permitting Team Lead at BSC. She is based out of BSC’s Glastonbury, 
Connecticut Office and has extensive environmental and biological 
consulting experience and specialization in federal, state, and local 
environmental licensing and permitting throughout New England (MA, 
CT, NH, and RI); threatened and endangered species surveys; and 
mitigation design and habitat restoration. She has worked on 
numerous projects from the early coordination phase to biological 
assessments and permitting phases, and to the final construction and 
wetland monitoring phase, including public and private development, 
natural gas pipeline, electric utility, solar, transportation and 
municipality projects. 
PROJECT EXPERIENCE HIGHLIGHTS 
Batterson Pond Park Renovations, Farmington, CT 
Senior Wetland Scientist 
Directed ecological surveys and complex inland wetland delineation 
for a multi-municipal park renovation involving Hartford, Farmington, 
New Britain, CT DEEP, and the federal US Army Corps of Engineers. 
The project included trails, amenities, parking, and water-based 
features, with a focus on wetland and water resource protection and 
improved pond water quality. Managed a challenging delineation 
requiring separate identification of state and federal wetlands and 
coordinated inter-municipal design and environmental review. 
Assisted in responding to local Conservation Commission requests 
for additional information. 
Kensington Avenue Flood improvement and  
Culvert Replacement Project, Meriden, CT 
Senior Wetland Scientist 
Responsible for the local, state, and federal permitting of a flood 
improvement project along Kensington Avenue in Meriden, CT. The 
project included roadway reconstruction, replacement of a culvert 
and stream bank restoration to help reduce flooding in the area. 
Project responsibilities included conducting field work and preparing 
the USACE wetland data forms for permitting. Other project tasks 
included managing preparation and submittal of the USACE Pre-
Construction Notification Form application, CT DEEP NDDB Project 
review checklist for rare species, CT DEEP Individual Section 401 
Water Quality Certification, and USFWS Section 7 consultation 
through IPaC. 
NARRATIvE  / 37

Page 261

Melissa Kaplan, PWS 
Nathan Hale Greenway, Coventry, CT 
Ecology & Permitting Specialist 
Supported team in conducting the study and 
preliminary design for a 7.5-mile multi-use path 
along the former CTDOT corridor and oversaw the 
development of a route selection alternatives 
matrix, offering graphical comparisons and 
construction cost estimates for each potential route. 
DEEP Pachaug Mountain Trail Design,  
Voluntown, CT 
Ecology & Permitting Specialist 
Providing ecological and permitting services for the 
design and mapping of a series of mountain bike 
trails within Pachaug State Forest in Voluntown, CT, 
on behalf of the Connecticut DEEP. The trail design 
will encompass 30 miles of sustainable, low-
maintenance mountain bike trails aimed at 
enhancing safety and accessibility for outdoor 
enthusiasts across the state. 
Island View Farms, Wetland Restoration Project, 
East Windsor, CT 
Project Manager 
Project manager for restoring and mitigating 
wetland fill at a site in East Windsor, CT. Oversaw 
field investigations, survey, permitting, and wetland 
mitigation plan design. Oversaw the installation of 
monitoring wells for review of groundwater levels to 
ensure proper wetland creation area design. 
Oversaw preparation of applications for and 
obtained local Inland Wetlands and Watercourse 
Commission and Planning Board Site Plan Special 
Use Permits. Attended several Inland Wetlands and 
Watercourses Commission and Planning Board 
meetings. Coordinated closely with the Town staff 
and worked with LEP subconsultant to test soils for 
contamination. Will also oversee mitigation area 
creation. 
Bridge Improvements, Goshen, CT 
Project Manager 
Responsible for providing wetland delineation 
services for the Town of Goshen Bridge 05155 
Improvement Project. The bridge carries West 
Hyerdale Drive over the Marshapaug River and the 
Town of Goshen is proposing to repair the bridge 
by installing structure lines in the existing culverts. 
Ms. Kaplan oversaw wetland delineations, invasive 
species inventories, reporting, a wetlands functions 
and values assessment, and an invasive species 
control plan to support local, state, and federal 
permitting of the proposed improvements. 
 
 
Highland Division Trail, Springfield, MA 
Ecology and Permitting Specialist 
Oversaw the ecological and permitting milestones 
for the construction of the trail segment between 
Hickory Street and Springfield College to East 
Longmeadow. The Highland Division trail will be 
approximately 1.75 miles long along the abandoned 
rail corridor. This multi-use trail will be a 12-foot-
wide paved path to be used by local walkers, 
joggers, and cyclists in the area.  
Citywide Invasive Species Management Plan, 
Stamford, CT 
Project Manager 
Managed a team of botanists and scientists to 
conduct a comprehensive survey of invasive plant 
species at 32 City parks, totaling approximately 448 
acres to create a Geographic Information System 
(GIS) based inventory. Currently overseeing the 
preparation of the Citywide invasive species 
management plan for the City. Working with 
experienced staff, the management plan is being 
prepared as a 5-year adaptive plan which allows 
the city to select the management using non-
chemical means first and modify the techniques 
over time. Analyses were conducted on the 
resources (City staff, volunteers, and consultants) 
needed to complete the management activities 
outlined in the plan.  
CT Department of Agriculture Farmland 
Restoration, Climate Resiliency and Preparedness 
Program, Statewide, CT 
Project Manager 
Managing a statewide initiative supporting the 
Connecticut Department of Agriculture’s Farmland 
Restoration and Climate Resiliency (FRCR) Program. 
Overseeing a multidisciplinary team of soil 
scientists, wetland scientists, climate resiliency 
specialists, and engineers to assess agricultural 
land for restoration potential and long-term climate 
adaptation. Directing all phases of project delivery, 
from application review and landowner 
coordination to site assessment, FRCR Plan 
development, and final reporting. Leading the 
implementation of a structured, science-based 
methodology to evaluate soils, hydrology, climate 
vulnerability, and land use practices on active 
farmland. Oversaw and conducted field 
assessments to identify restoration priorities and 
recommend climate-resilient infrastructure, green 
solutions, and soil and water resource 
improvements. Delivered comprehensive FRCR 
Plans and Completion Reports to the Department of 
Agriculture ensuring regulatory compliance and 
environmental integrity.  
38 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP

Page 262

 
 
 
 
YEARS OF EXPERIENCE 
5 
EDUCATION 
BS, Civil Engineering,  
University of Connecticut  
LICENSES 
Professional Engineer 
• CT #39401 
CERTIFICATIONS 
• OSHA-10 
Jessie 
Dupont IV, PE 
Civil Engineer / Site Design 
Associate 
MEET JESSIE  
Jessie is a Civil Engineer with experience in surveying, site design, 
and construction administration across municipal, recreational, and 
private development projects. His expertise includes preparing 
complete plan sets with site layout, grading and drainage, utilities, 
erosion control, and site preparation.  
Jessie has continued to expand his work in roadway and site design, 
utility coordination, and field support, contributing to projects that 
balance technical precision with practical constructability.  
EXPERIENCE IN SURVEY, CONSTRUCTION 
ADMINISTRATION, SITE LAYOUT AND SITE DESIGN  
PROJECT EXPERIENCE HIGHLIGHTS 
Wilson Gateway Park, Windsor, CT 
Civil Engineer 
Providing construction support for the Town during the construction 
of a new municipal park. On-site review of the construction progress, 
techniques, and responded to contractor requests for information. 
Attended weekly construction meetings to review schedule updates 
and progress reports. Worked alongside utility representatives to 
monitor contractor performance. 
Clover Street Park, Windsor, CT 
Civil Engineer 
Providing construction support for the Town during the construction 
of a new cricket field. Provided drainage design and specifications for 
the Bid Documents, as well as construction support including design 
modifications to address unknown conditions. Also provided review 
of the construction progress, techniques, and responded to 
contractor requests for information. Attended weekly construction 
meetings to review schedule updates and progress reports. 
NARRATIvE  / 39

Page 263

Jessie Dupont IV, PE 
S. Eagleville Green Apartments, Mansfield, CT 
Civil Engineer 
Several multi-story apartment buildings and parking 
lot and drive. Worked on construction 
administration services and site changes to grading 
and drainage during the process of construction.  
Tolland Medical Center, Tolland, CT 
Civil Engineer 
New medical building and access drive for a vacant 
lot. Worked on the layout, grading, drainage, utility, 
and site preparation plans for a wetland and 
planning and zoning submission.  
Williams Street Improvements, Phase II,  
New London, CT 
Civil Engineer 
Street improvement project that includes a 
redesign of curbing, pavement markings to 
accommodate bike lanes and parallel parking, 
sidewalks that allow ADA access, and a redesign of 
a state route intersection. Led the engineering team 
in providing the design plans for bidders.  
Quinebaug Valley Rail Trail, Southbridge, MA  
Site Engineer, Construction Observer 
Conversion of an existing railroad bed 
approximately 7 miles in length into a walking and 
biking trial with several site changes to allow for 
ADA access to the trail. Provided daily on-site 
construction observation and led the construction 
engineering team in solving changes to plans and 
tracked progress of work completed for the town 
for pay requests from the contractor. 
River Street and Crane Street Improvements, 
Southbridge, MA  
Site Engineer, Construction Observer 
Street improvement project that included 
replacement of a water main, installation of 
drainage structures, and new curbing and sidewalk 
to allow for more efficient ADA access. Provided 
daily on-site construction observation and led the 
construction engineering team in resolving plan 
changes and tracking work completed for 
contractor pay requests submitted to the town. 
 
 
 
 
 
PRIOR TO JOINING BSC GROUP,  
JESSIE CONTRIBUTED TO THE  
FOLLOWING PROJECTS: 
Springfield Flood Protection System Inspections, 
Springfield, MA  
Civil Engineer 
Inspection of the entire length of the Springfield 
Flood Protection System and compiled a report of 
findings and recommendations for repair twice a 
year.  
West Grove Street Waterbury Housing Authority, 
Waterbury, CT  
Civil Engineer 
Several multi-story apartment buildings along West 
Grove Street in Waterbury. Project would include a 
redesign of the residential street with parking lot 
and utility coordination with the city. Helped with 
layout, grading, drainage, and utility plans for this 
project.  
Bristol Magnet School, Bristol, CT  
Civil Engineer  
Parking lot and drive redesign to an existing middle 
school with construction of an addition on the 
building. Performed weekly inspections for erosion 
and sedimentation control for the construction site 
while the project was being completed.  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
40 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP

Page 264

Anticipated  
Town Support
BSC may request assistance from the  
Granby Department of Public Works to  
provide equipment and an operator for  
test pit excavation.
ANTICIPATED TOWN SUPPORT / 41

Page 265

42 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP

Page 266

Cost Proposal
COST PROPOSAL / 43

Page 267

44 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP

Page 268

Page 7 of 7
AP
PENDIX A 
Cost Proposal 
N
ame of Engineering Firm: ___________________________________________________ 
Services Needed 
On-C
all Engineering and Related Services 
Please indicate your firm’s hourly fees over the five-year period of the contract 
Billing Category Hourly Billing Rate 
P
roject Manager ________________ 
Chief Engineer ________________ 
Engineer ________________ 
Technician Support ________________ 
Clerical/Researcher ________________ 
Other  ________________ 
Other Expenses (if applicable): 
 
 
 
 
 
Identify any other categories and costs required to provide Engineering and On-Call 
services that are not included above:  
________________________________________________________________________ 
________________________________________________________________________ 
________________________________________________________________________ 
BSC Group, Inc.
$285
$225
$165
$140
$110
Direct Expenses will be billed with a 10% markup. Direct Expenses include cost of transportation, shipping/courier 
service, printing and reprographics, telecommunications, presentation graphics, project supplies, subcontractors, 
subconsultants and other costs directly applicable to the individual project.
Premium rates will apply to overtime hours, night shifts and weekend work if and to the extent allowed by 
applicable law. All rates are subject to adjustment, typically at the start of each calendar year.
(2026)*
* BSC reserves the right to apply a 4% increase to these Billing Rates each year for the remainder of this contract.
COST PROPOSAL / 45

Page 269

46 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP

Page 270

Page 271

www.bscgroup.com

Page 272

Town of Granby, Connecticut
July 24, 2026
Response to Request for Proposals
Professional Engineering Services

Page 273

 
 
BETA GROUP, INC. 
1010 Wethersfield Avenue, Suite 305, Hartford, CT 06114 
P: 844.800.2382 | F: 401.333.9225 | W: www.BETA-Inc.com 
 
July 24, 2026 
 
Mr. Mike Walsh, Town Manager 
Town of Granby 
15 North Granby Road  
Granby, CT 06035 
 
RE: Request for Proposals - Professional Engineering Services 
 
Dear Mr. Walsh,  
 
BETA Group, Inc. (BETA) is pleased to submit our qualifications in response to the Town of Granby's Request for Proposals for 
Professional Engineering Services. For more than 40 years, BETA has partnered with municipalities across New England to 
deliver comprehensive engineering, planning, and environmental consulting services. We appreciate the opportunity to be 
considered for the Town's five-year on-call contract. 
 
We understand that the Town is seeking a responsive and reliable engineering partner capable of supporting a diverse range 
of municipal capital improvement initiatives. BETA’s multidisciplinary team offers extensive experience providing planning, 
design, permitting, and construction-phase services for parks and recreation facilities, municipal buildings, transportation 
infrastructure, water and wastewater systems, and a variety of public works projects. 
 
I will serve as Principal in Charge and will have full authority to commit BETA resources to the successful delivery of this 
contract. Jason Ouimet, PE, LEED AP, will serve as Project Manager and primary point of contact. Backed by the depth of 
expertise within our Hartford office and firmwide technical staff, our team is well equipped to provide responsive, high-quality 
engineering services tailored to the Town’s needs. 
 
The representative projects included in our submission highlight our experience delivering municipal on-call engineering 
services throughout Connecticut, including parks and recreation improvements, athletic facilities, roadway and site design, 
utility infrastructure, environmental permitting, and construction administration for projects similar in scope and complexity 
to those anticipated under this contract. 
 
BETA has no known conflicts of interest that would affect our ability to provide the requested services. Any requested 
clarifications or exceptions regarding the proposed contract documents are identified separately within our proposal. 
 
Thank you for your consideration. We value the opportunity to partner with the Town of Granby and look forward to 
discussing how BETA's experience, technical expertise, and commitment to client service can help advance the Town's capital 
improvement goals. 
 
Sincerely, 
BETA GROUP, INC. 
 
 
 
Najib O Habesch 
Senior Vice President / Principal in Charge  

Page 274

Page 275

1. Company Profile

Page 276

 Established in 1982, BETA employs over 170 engineers, planners, scientists, landscape
architects, GIS/asset management specialists, construction managers, and support personnel.
 BETA provides sustainable and innovative consulting solutions.
 As a New England-based employee-owned firm (ESOP), employees have a vested interest in the
success of projects and services to clients.
 BETA has provided integrated solutions that improve the communities where we live and work
for over 40 years.  We provide a wide range of services – from planning to analysis to design –
for municipalities and agencies throughout New England.

Page 277

BETA’s core values of teamwork, employee ownership, quality, client service, and integrity are at the
heart of everything we do and drive us in our mission to improve the communities in which we live and
work.
Effective communication with our clients is one of BETA’s priorities, and, as such, is a hallmark of our
way of practice. We have found that the best approach to maintaining effective communication is to
assign a project manager who understands the various aspects of the individual projects and tasks from
the client’s perspective. For this contract, Najib Habesch will serve as the principal in charge, and Jason
Ouimet will serve as the project manager and primary point of contact.
Principal in Charge
NHabesch@BETA-Inc.com
Project Manager
JOuimet@BETA-Inc.com
With offices in Lincoln, RI; Boston, Chicopee, Norwood, and Worcester, MA; Hartford, CT; and
Manchester, NH, BETA has the capacity and depth of staff to handle both large and small projects. Work
performed for this contract will be managed out of our Hartford, CT office with support from other
offices.

Page 278

2. Understanding of Services

Page 279

BETA understands that the Town of Granby is seeking a responsive, multidisciplinary engineering partner
capable of supporting a diverse range of municipal capital improvement projects through a task-order-based
on-call contract. The selected consultant will be expected to provide timely technical expertise across
multiple disciplines while adapting to the Town's evolving priorities over the duration of the agreement.
Anticipated assignments include improvements to parks and recreational facilities, such as athletic track
replacement, baseball and softball field renovations, pickleball courts, and a new year-round restroom
facility at Salmon Brook Park, as well as sewer pump maintenance projects and other municipal
infrastructure improvements. These projects require coordinated civil, structural, landscape architecture,
environmental, traffic, water/wastewater, and construction administration services.
BETA's multidisciplinary team is well-positioned to support these assignments from planning and permitting
through design, bidding, and construction. Our experience delivering municipal on-call engineering services
throughout Connecticut enables us to respond efficiently to individual task orders while providing practical,
cost-effective solutions that align with the Town's schedule, budget, and long-term capital improvement
goals.
BETA’s typical on-call approach is built on clear communication, efficient execution, and responsive service.
A typical assignment follows the process illustrated below.
BETA has the staff, technical resources, and organizational structure to successfully support the Town of
Granby's Engineering On-Call Services contract. With more than 170 professionals across seven New England
offices, including our Hartford, Connecticut office, our multidisciplinary team can efficiently respond to
concurrent task orders while providing continuity of service. By drawing upon specialists in roadway and site
engineering, landscape architecture, traffic engineering, structural engineering, environmental permitting,
water and wastewater engineering, and construction administration, we are able to assemble the right team
for each assignment. Our experience delivering municipal on-call contracts throughout Connecticut enables
us to provide responsive, high-quality services that meet the Town's schedule, budget, and project needs.
FINAL WORK
PRODUCT

Page 280

3. Relevant Experience

Page 281

BETA has extensive experience planning, designing, and
constructing parks and recreation facilities for municipalities
and school districts throughout New England. Our portfolio
includes park master plans, athletic field renovations, court
improvements, playgrounds, trails, restroom facilities, site
utilities, drainage, parking, and accessibility improvements.
Representative Connecticut projects include Hartford's
Keney Park Master Plan and Colt Park Athletic Fields, as well
as Martin Park Improvements in East Hartford. In
Massachusetts, BETA has completed athletic facility
improvements for Natick and Plymouth Public Schools.
BETA has successfully delivered multidisciplinary
engineering services through numerous municipal on-call
contracts, providing responsive support for roadway, site,
drainage, utility, permitting, and capital improvement
projects. Our long-standing relationships with
municipalities, including Hartford, East Hartford, and
Enfield, demonstrate our ability to quickly respond to task
orders, coordinate with municipal staff, and deliver projects
from planning through construction.
Our team routinely provides civil, structural, environmental,
and water/wastewater engineering services for municipal
facilities and infrastructure. This includes site
improvements, stormwater management, utility
coordination, environmental permitting, sewer pump
station improvements, municipal buildings, parking facilities,
and construction administration, allowing us to support the
diverse engineering needs that arise under an on-call
contract.

Page 282

To further demonstrate our qualifications, representative project sheets are included in the Appendix to this
submission. These examples highlight BETA's experience delivering municipal on-call engineering services,
athletic field and park improvements, recreation planning, and multidisciplinary infrastructure projects and
reflect the range of services anticipated under this contract.
Representative Project Relevance to Town of Granby
Colt Park Athletic Fields
Improvements
Hartford, CT
Demonstrates design and construction of municipal athletic fields,
recreational amenities, drainage, and supporting site infrastructure.
Goodwin Park Golf Course
Irrigation & Booster Pump
Hartford, CT
Demonstrates multidisciplinary engineering for municipal park
infrastructure, including civil, mechanical, electrical, and water system
improvements supporting recreational facilities.
Keney Park Master Plan
Hartford, CT
Demonstrates comprehensive park master planning, public engagement,
recreation programming, accessibility improvements, sustainability
initiatives, and implementation planning for a large municipal park.
Engineering On-Call Services
Hartford, CT
Demonstrates responsive, multidisciplinary engineering services
delivered through a municipal on-call contract.
Martin Park Improvements
East Hartford, CT
Illustrates design of park roadway, drainage, parking, ADA
improvements, and new athletic court facilities, combining recreation
improvements with municipal infrastructure design.
Engineering On-Call Services
East Hartford, CT
Illustrates successful delivery of task-order engineering services for
municipal roadway, site, drainage, and infrastructure improvements.
Engineering On-Call Services
Enfield, CT
Highlights ongoing municipal engineering support, permitting, utility
coordination, and construction administration under an on-call
agreement.
High School Athletic Facilities
Natick, MA
Relevant experience designing athletic fields, track facilities, courts,
parking, and associated site improvements
High School Athletic Facilities
Plymouth, MA
Demonstrates planning and design of athletic fields, synthetic track,
courts, and recreational site infrastructure.
Task-Based Traffic & Safety
Engineering Services
CTDOT
Demonstrates the ability to manage multiple concurrent task
assignments using a multidisciplinary team and established project
management procedures.

Page 283

4. Team and Key Staff

Page 284

BETA understands that developing the right project team is paramount to a project’s success. The
individuals assembled for this contract have the qualifications to successfully undertake the nature of
work described within your Request for Proposals. Full resumes for the following team members are
included in the Appendix.
Najib is the Senior Vice President in charge of the firm’s Hartford, Connecticut, office. In this capacity, he
is responsible for cultivating and coordinating the office’s activities using his exceptional leadership,
management, and marketing skills. After serving in the public sector for many years, Najib joined the
private sector, where his career path took him from working with private developers to designing
complex intelligent transportation systems. He demonstrates a keen ability to “get the job done,” even
under circumstances where multiple assignments have had to be completed simultaneously. He does so
with the utmost professionalism, service to his clients, and quality-based deliveries.

Page 285

Jason is a dedicated Associate with experience working on a wide variety of transportation and land
development projects for public and private sector clients in Connecticut and Massachusetts. Jason is
thoroughly familiar with the LOTCIP program, having designed recent LOTCIP-funded projects in Groton,
East Hartford, Meriden, and West Haven. He also serves as project manager for BETA’s peer reviews of
LOTCIP-funded projects administered through the Capital Region Council of Governments. His
experience includes highway and roadway design, hydrological and hydraulic analysis and reports,
drainage design, stormwater management, utility planning, and site planning. Jason’s background is
extensive and varied. It includes rail trail conversions, streetscape improvements, complete streets,
interchange improvements, sports complexes, and multimodal transportation facilities. He is focused on
producing work efficiently and accurately, staying within budget, and bringing innovative solutions to
every job.
In his role as Vice President, Jay brings strong expertise in municipal infrastructure design and
management, gained from 42 years of experience in both the public and private sectors. He is
thoroughly familiar with all aspects of civil, site, utility, roadway engineering, estimating, and
construction inspection with an emphasis on project management and contracting methods utilizing
local, state, and federal funding.
Jay has provided design, construction administration, and management services for numerous public
infrastructure improvements throughout his career. He has also been responsible for complete design
and/or served as a project/construction manager for more than a dozen Connecticut Department of
Transportation projects, specializing in state and municipal arterial, streetscapes, and local road design,
pavement management, rehabilitation methods, techniques, construction engineering, administration,
and management. Jay has also designed and managed the design and construction of numerous public
park projects, athletic fields, and utility improvement projects throughout his career.
Kwesi is a Vice President at BETA with over 24 years of experience in transportation engineering across
federal, state, local, and private sectors. He brings extensive experience leading multidisciplinary teams,
managing complex transportation programs, and serving as project and contract manager for large,
multi-year municipal and DOT assignments, consistently delivering projects on time and within budget.
Kwesi has successfully partnered with state DOTs, municipalities, and regional agencies to advance
roadways, traffic signals, and multimodal improvements, and is known for his collaborative approach,
technical oversight, and commitment to client service. He is a licensed Professional Engineer, a
Professional Traffic Operations Engineer (PTOE), and a past president of the Connecticut Institute of
Transportation Engineers.
Laura Krause will provide environmental engineering and permitting support for the contract. With 12
years of experience in environmental consulting and engineering, she specializes in environmental
permitting, ecological assessment, wetland delineation, and regulatory compliance for municipal
infrastructure projects throughout New England. Laura has supported roadway improvements, bridge
replacements, rail trails, and other public works projects, preparing permit applications, wetland
replication plans, invasive species control plans, and environmental documentation while coordinating
with local, state, and federal regulatory agencies. Her experience helps clients efficiently navigate
environmental requirements and maintain project schedules from planning through construction.

Page 286

Joseph McLoughlin will provide environmental site assessment, hazardous materials, and contaminated
soil management support for the contract. With 34 years of environmental consulting experience, he
specializes in Phase I and II Environmental Site Assessments, site investigations, regulatory compliance,
soil management, and remediation for municipal infrastructure projects. As a Connecticut Licensed
Environmental Professional, Joe has supported transportation, utility, and redevelopment projects
throughout the state, including environmental assessments, hazardous building material investigations,
CTDEEP regulatory coordination, and contaminated soil management for public infrastructure
improvements. His expertise helps municipalities identify and address environmental constraints while
maintaining project schedules and regulatory compliance.
Chris has 29 years of experience specializing in structural engineering. Chris is versed in the inspection,
design, and construction of a wide range of structure types, including bridges, wastewater treatment
structures, industrial buildings, and retaining walls. His project experience has included entirely new
structures, as well as both major and minor rehabilitations. His bridge designs range from simple culvert
replacements to complex covered bridge rehabilitations. He has conducted peer reviews of contract
documents for MassDOT, including structures in Agawam, Buckland, Chesterfield, and Townsend.
Additionally, he was the Lead Structural Engineer on MassDOT’s project rebuilding Central Street Bridge
in Easton.
Randy, a landscape architect and vice president at BETA with over 37 years of experience, has dedicated
his career to public-sector projects that enhance communities through thoughtful and innovative
design. His expertise includes revitalizing historic downtowns, designing parks and open spaces,
improving streetscapes and urban environments, and creating bicycle and pedestrian trail networks that
strengthen community connectivity. He is also skilled in school and municipal site design and aesthetic
improvements to infrastructure, such as bridges. A hallmark of his work is his ability to engage the
public—clearly presenting design concepts, fostering open dialogue, and integrating community
feedback into successful, context-sensitive solutions.
Christopher Cronin has 36 years of civil and environmental engineering experience delivering municipal
infrastructure projects throughout New England. His expertise includes wastewater collection and
pumping systems, stormwater infrastructure, utility improvements, construction administration, and
facility planning for public-sector clients. Chris has managed projects from planning and design through
permitting and construction, coordinating multidisciplinary teams to deliver complex capital
improvements on schedule and within budget. His experience supporting municipalities with both utility
infrastructure and broader civil engineering projects makes him well-suited to oversee Granby's on-call
engineering assignments and provide responsive technical leadership throughout the five-year contract.
Danny is a civil engineer with more than 24 years of experience delivering municipal infrastructure,
roadway, and streetscape improvement projects throughout Connecticut and Massachusetts. His
expertise includes construction engineering and inspection, roadway reconstruction, ADA compliance
improvements, drainage design, utility coordination, and multimodal infrastructure enhancements. He

Page 287

has served key roles in complex urban and community-focused transportation projects, providing
construction oversight, quality assurance, submittal review, stormwater compliance, and coordination
with contractors, municipalities, and residents. He has experience administering projects in accordance
with CTDOT procedures and supporting the successful delivery of safety and accessibility improvements,
including pedestrian facilities, traffic control systems, and complete streets enhancements. As a licensed
Professional Engineer, Danny provides practical, field-oriented leadership and technical oversight to
ensure projects are delivered efficiently and safely and aligned with client goals and community needs.
Luchs Consulting Engineers (Luchs) was founded in 1980. Luchs specializes
in civil, highway, traffic, structural, and utility design, as well as architecture
and inspection services. This multidisciplinary structure allows land
surveying services to be closely coordinated with planning, engineering,
permitting, and construction activities. All surveying assignments are performed by highly skilled
technicians under the responsible charge of a licensed Professional Land Surveyor, with a consistent
emphasis on accuracy, quality control, and regulatory compliance from project initiation through final
deliverables.
Luchs provides comprehensive land surveying services essential to the successful coordination of
engineers, architects, planners, and inspectors. Services include investigation of utility company records
for underground and aerial systems; review of municipal records such as street rights-of-way, Assessor’s
Maps, and record drawings; establishment of horizontal and vertical survey control; field surveys of
existing utilities, roadways, and surface features; aerial utility mapping; and preparation of topographic
surveys in accordance with Connecticut State Agency regulations and municipal standards. When record
information is incomplete, the firm coordinates with municipalities to obtain required permits, including
Police and Traffic Control, to confirm sewer inverts and pipe sizes. All work utilizes current surveying
technology and industry-standard software to deliver accurate, efficient, and reliable survey data in
support of project design, environmental review, and construction.
Down to Earth Consulting, LLC (DTE) is a Connecticut-based, SBE-
and MBE-certified geotechnical consulting firm with over 30
years of regional experience providing geotechnical,
geostructural, and geoenvironmental engineering services.
Located in Naugatuck, CT, DTE has contributed to hundreds of infrastructure projects throughout the
Northeast, including trail systems, flood control infrastructure, pavement design, bridge foundations,
and geotechnical instrumentation/monitoring.
DTE’s specialized expertise helps identify and resolve complex subsurface challenges early in the design
phase, supporting the City’s goals for accelerated delivery and cost efficiency. Their service offerings
include the following:
 Subsurface investigations and laboratory testing
 Foundation and retaining wall analysis
 Slope stability evaluations
 Construction-phase geotechnical observation and reporting
 Pavement section recommendations

Page 288

DTE’s deep understanding of construction practices and multidisciplinary project environments ensures
reliable geotechnical insights that directly support the structural integrity and longevity of municipal
transportation infrastructure.
Aztech Engineers, Inc. is a Hartford, Connecticut-based consulting
engineering firm founded in 1995 that provides mechanical,
electrical, plumbing (MEP), fire protection, and lighting design
services for public- and private-sector clients throughout the region. The firm's expertise includes the
planning and design of building systems, electrical distribution, emergency power, site and roadway lighting,
and code-compliant fire protection systems for municipal facilities and infrastructure. Working
collaboratively with multidisciplinary design teams, Aztech delivers practical, sustainable, and cost-effective
MEP solutions that support parks, public buildings, transportation, and other municipal improvement
projects.

Page 289

5. References

Page 290

There is no better benchmark for the quality of services provided by our staff than feedback and
testimonials from our clients. BETA is pleased to provide the following list of references for your
consideration.
Road Engineer
Town of Enfield
820 Enfield Street
Enfield, CT 06082
860.763.7095
Public Works Services Coordinator
City of Groton
295 Meridian Street
Groton, CT 06430
860.446.4164
City Engineer
City of Hartford
50 Main Street
East Hartford, CT 06108
860.291.7380
Executive Coordinator
Town of Greenwich
101 Field Point Road
Greenwich, CT 06836
203.622.7894
Director of Public Works
City of Meriden
142 East Main Street
Meriden, CT 06450
203.630.4018
LOTCIP Program Manager
CRCOG
350 Church Street, 3rd Floor
Hartford, CT 06103
860.724.4220

Page 291

Appendix - Project Sheets

Page 292

Colt Park Athletic Fields and Park Improvements
Hartford, Connecticut
REFERENCE
Frank Dellaripa
City Engineer / Assistant Director
50 Jennings Rd. 2nd floor
Hartford, Connecticut  06120
860.757.9975
SERVICES PROVIDED
• Landscape Architecture 
• Athletic Field Design 
• Master Planning 
• Cost Estimating 
• Public Outreach 
• Survey Coordination 
• Lighting Design Coordination 
• Historic Resource Planning 
PROJECT STATUS
Ongoing
PROJECT BENEFITS
 3 Athletic Field Improvements
 3 Historic Preservation
 3 Accessibility Enhancements
 3 Community Engagement
 3 Park Connectivity
 3 Public Safety Improvements
Colt Park is a 106-acre historic urban park listed on the National Register of Historic 
Places and serves as one of Hartford’s premier recreational and community 
destinations. Building upon the City’s 2017 Colt Park Master Plan, BETA is assisting 
the City of Hartford with the planning and design of targeted improvements intended 
to enhance recreation opportunities, improve accessibility, and preserve the park’s 
historic character. 
Working closely with the City of Hartford Department of Public Works, community 
stakeholders, and a multidisciplinary consultant team, BETA is preparing schematic 
design and design development plans for a series of park-wide improvements. Key 
project elements include the design of four athletic fields with synthetic turf, field 
lighting, drainage improvements, pedestrian and site lighting upgrades, reconstruction 
of the historic Wethersfield Avenue fence, and enhanced pedestrian connections 
between the Samuel Colt Monument, athletic facilities, and other park amenities. 
The project also includes removal of the existing running track, conversion of 
underutilized areas to active recreation space, coordination with the City’s urban 
forestry program, and preparation of planning-level construction cost estimates to 
support future implementation. Through stakeholder engagement, visual simulations, 
and phased design development, the project seeks to create a safer, more connected, 
and more resilient 
park while honoring 
the historic legacy of 
one of Hartford’s most 
iconic public spaces.

Page 293

Goodwin Park Golf Course Irrigation & Booster Pump
Hartford, Connecticut 
REFERENCE
Frank Dellaripa, PE
City Engineer
City of Hartford 
50 Jennings Road 
Hartford, CT 06120
860.757.9975
Frank.Dellaripa@Hartford.gov
SERVICES PROVIDED
• Mechanical, Electrical, 
Architectural, and Civil Design 
PROJECT STATUS
Completed 2025
 
PROJECT COST
Design Cost: $97,000
Construction Cost: $4,950,000
PROJECT BENEFITS
 3 Improved performance at 
reduced cost
BETA provided professional engineering services to design improvements to the 
irrigation system and the water supply at the Goodwin Park Golf Course in Hartford, 
Connecticut.  The project included a Systemwide Water Supply Feasibility Study and 
design of a new irrigation system for the 27-hole golf course to remove it from the 
existing public water supply system.  The project goals were:
• Provide an alternative source of water for irrigation of the golf course.
• Design a packaged booster pump skid package and appurtenances to automatically 
pump water from the northern-most pond to the irrigation system located at the 
golf course.
• Prepare the design for instrumentation, monitoring and controls to comply with 
the existing diversion permit requirements.
• Prepare the design for a new irrigation system at the twenty-seven (27) hole golf 
course.
A new booster pump system will provide a more reliable water source and will be 
capable of providing the water at an increased pressure.  With these capabilities, a new 
booster pump system could exacerbate the current issues with the existing irrigation 
system.  Given that the existing irrigation system is 30 years old, it has reached the 
typical life expectancy of a system.  

Page 294

Keney Park Master Plan 
Hartford, Connecticut 
REFERENCE
Nasha Rhone 
Senior Project Manager 
City of Hartford 
50 Jennings Road 
Hartford, CT 06120
860.757.999
Nasha.Rhone@hartford.gov  
SERVICES PROVIDED
• Master Planning
• Community Engagement
• Landscape Architecture
• Parking Analysis
• Civil Engineering
• Transportation Planning
• Sustainability Solutions
• Project Management Oversight
• Grant Funding Coordination 
PROJECT STATUS
Ongoing
 
PROJECT COST
Total Design Cost   $175k
Keney Park, designed by Fredrick Law Olmsted in the late 19th century, is Hartford’s 
largest public park at 692 acres and one of the largest municipal parks in New England. 
BETA Group, Inc. was retained by the City of Hartford, in partnership with Friends of 
Keney Park, to prepare a comprehensive master plan guiding the park’s long-term 
restoration and revitalization. 
The scope included an existing conditions assessment, historical research, an extensive 
public engagement process featuring over 25 1x1 stakeholder interviews and 3 public 
input sessions to shape a shared vision for the park’s future. Building on this input, the 
master plan establishes a framework for capital improvements, including development 
of an urban Nature Center, a new performance facility, plans to re-open nearly 200 
acres of park that were closed for the past 20 years, development of a multi-modal 
trail through the park as part of the East Coast Greenway, updgraded recreational 
amenities (playgrounds, athletic fields, and splashpads), improved accessibility and 
wayfinding and sustainability initiatives addressing stormwater management and 
habitat conservation. As part of this effort, BETA also is engaged in schematic design 
and the development of construction documents for priority projects identified by the 
community and client. The plan positions Keney Park as a space for vibrant, accessible, 
and ecologically resilient open space for the surrounding neighborhoods and the 
greater Hartford region and beyond for generations to come. 

Page 295

On-Call Engineering Services
Hartford, Connecticut
REFERENCE
Frank Dellaripa, PE
City Engineer
City of Hartford
50 Jennings Road
Hartford, CT 06120
860.757.9975
 
SERVICES PROVIDED
• Design
• Planning
• Safety
PROJECT STATUS
Ongoing
PROJECT BENEFITS
• Traffic Signal Equipment 
Assessment
• On-Street Parking Assessment
• Crosswalk Installation 
Assessment
• Structural Analysis
• Bicycle Lane Design
The City of Hartford retains BETA under an on-call contract to provide traffic 
engineering services in support of the Department of Public Works. BETA responds to 
a wide range of transportation planning, traffic operations, safety, and infrastructure 
needs, providing timely engineering services to address City priorities and resident 
concerns. Services have included:
• Site plan and traffic study review
• Traffic signal corridor retiming
• Traffic signal equipment assessment and repair design
• Signal plan revisions
• Bicycle facility planning and design
• Local Road Accident Reduction Program applications
• All-way stop sign assessments
• Crosswalk installation assessments
• Traffic signal warrant analyses
• Signal interconnect wiring assessment and repair
• On-street parking assessments
• School crossing guard safety assessments
• Structural analysis for span pole replacements
• Bid documents for loop detector testing and replacement
• Street design and reconstruction
• Public park design
• Golf course irrigation
• Pond dredging
Drawing on this broad range of assignments, BETA has provided responsive engineering 
support tailored to the City’s evolving priorities. Services have included field 
investigations, engineering analyses, design development, technical recommendations, 
and construction-related documentation to help the City implement improvements 
that enhance transportation safety, mobility, and system performance.

Page 296

Martin Park Improvements 
East Hartford, Connecticut 
REFERENCE
Douglas Wilson, PE
Town Engineer 
Town of East Hartford 
740 Main Street 
East Hartford, CT 06108
860.291.7380
DWilson@easthartfordct.gov
SERVICES PROVIDED
• Drainage Investigation
• Engineering Design 
• Roadway & Site Improvements
• Athletic Court Layout & Design
PROJECT STATUS
Ongoing
 
PROJECT COST
Design Cost   $136,600
PROJECT BENEFITS
 3 Improved drainage, roadways, 
& new athletic court
This project consists of the reconstruction or rehabilitation of approximately 3,000’ of 
the park road in Martin Park, East Hartford, CT along with the conversion of an existing 
skate park into a hard-surface soccer court (futsal court) with new fencing and parking 
lot improvements. 
The improvements include full-depth park road reconstruction or reclamation where 
applicable, new park road drainage infrastructure (as needed), addressing erosion 
issues, bituminous curbing where appropriate, ADA compliant vehicle parking 
improvements, side driveway reconstruction, the removal of pull-off areas, and the 
installation of new wooden guiderail.  

Page 297

On-Call Engineering Services - Development & Implementation of a 
Road Improvement Program 
East Hartford, Connecticut 
REFERENCE
Douglas Wilson 
Town Engineer 
Engineering Division 
740 Main Street 
East Hartford, CT 06108
860.291.7383
SERVICES PROVIDED
• Asset Management 
• Pavement Evaluation 
• Capital Improvement Plans 
• Design 
• Construction Services 
• Training Program 
PROJECT STATUS
Ongoing
 
 
BETA was retained by the Town under an on-call contract to inventory roadway assets, 
evaluate pavement conditions, develop repair recommendations, prepare construction 
documents, provide construction phase services, and support implementation of 
the Town’s road improvement program. Through this ongoing partnership, BETA 
has provided asset management, roadway design, drainage improvements, capital 
planning, and staff training to help the Town maintain and improve its transportation 
infrastructure. 
 
Initial assignments included assessments of roadway conditions, pavement markings, 
guiderails, signage, sidewalks, and curb ramps. BETA utilized its ManageMyRoads Asset 
Management Platform, integrated with GIS capabilities and ArcGIS Online (AGOL), to 
collect, manage, and analyze roadway asset data. The platform enables the Town to 
prioritize repairs, develop a realistic capital improvement plan, and efficiently manage 
its transportation infrastructure over the long term. 
 
Additional assignments included the full-depth reconstruction of Burnham Street 
and Sherwood Drive to improve pavement conditions and mitigate flooding. Flood 
mitigation measures included conveying runoff from the north side of Burnham Street 
to a wetland area on the south side through a series of culverts and implementing 
stormwater best management practices (BMPs) to reduce peak flows and runoff 
volumes. BETA also provided engineering design services for roadway improvements 
on May, Summer, June, and Blinn Streets, including pavement reconstruction, new 
bituminous concrete curbing, driveway and sidewalk reconstruction, ADA-compliant 
curb ramps, drainage structures, signage, and pavement markings. 
 
As part of the on-call contract, BETA also trained Town staff to use the State of 
Connecticut’s Vendor-in-Place (VIP) resurfacing contracts. The training program 
included evaluating roadway suitability for expedited resurfacing, assessing Public 
Rights-of-Way Accessibility Guidelines (PROWAG) requirements, developing 
implementation schedules, coordinating utility meetings, documenting project costs, 
and managing contractor coordination for milling, paving, and pavement marking 
operations.

Page 298

On-Call Engineering Services
Enfield, Connecticut
REFERENCE
Donald Nunes 
Director of Public Works 
Town of Enfield 
820 Enfield Street
Enfield, CT 06082
860.763.7527 
SERVICES PROVIDED
• Analysis 
• Design
• Permitting
• Construction Services and 
Inspection 
PROJECT STATUS
Ongoing
 
PROJECT BENEFITS
• Stormwater Management 
• New Sidewalks 
• Improved Roadway 
Infrastructure
BETA provides on-call engineering services to the Town of Enfield, including design, 
permitting, and construction phase services. Through this ongoing contract, BETA has 
completed multiple concurrent roadway reconstruction and drainage improvement 
assignments, including:
Thompsonville Northeast Road Reconstruction
This project involved full-depth reconstruction of approximately 10,520 linear feet of 
roadway on Dover Road, Eleanor Road, Foxcroft Road, Freemont Road, Leonard Road, 
and Montana Road. Improvements also included replacement of sidewalks, storm 
drainage, and curbing.
Thompsonville Southwest Road Reconstruction 
This project involved design and construction inspection for the full-depth 
reconstruction of approximately 5,600 linear feet of roadway on Spring Street, Cross 
Street, South Street, Pease Street, and Maple Avenue. Improvements included 
replacement of the roadway, sidewalks, driveways, storm drainage, and curbing.
Saint James West Reconstruction 
BETA provided construction inspection services for the full-depth reconstruction of 
approximately 10,369 linear feet of roadway and installation of storm drainage on 
Carmela Terrace, Ganny Terrace, Joan Drive, Marshal Drive, and Saint James Street.
Drainage analyses identified deficiencies in the existing storm drainage system for the 
25-year storm event and informed design modifications to increase system capacity, 
control gutter flow, and reduce ponding.
The team also assisted the Town in obtaining an Inland Wetlands and Watercourses 
Act permit and prepared a Connecticut Department of Energy and Environmental 
Protection (CT DEEP) General Permit application for the Discharge of Stormwater and 
Dewatering Wastewaters Associated with Construction Activities.

Page 299

Natick High School - Sports Facilities
Natick, Massachusetts
REFERENCE
Tim Collins
Natick Athletic Director
15 West Street
Natick, MA  01760
508.647.6607
SERVICES PROVIDED
• Design
• Planning
• Construction Documents
PROJECT STATUS
Completed
 
The site design for the athletic facilities includes two ball-fields complete with back-
stops, bleachers, and bench dugouts with a multi-use field in natural turf and several 
tennis courts along with two basketball courts.  These facilities are located together on 
the north side of the school property overlooking Dug Pond.  A synthetic turf football 
field and a synthetic track has also been designed and constructed for the school on 
property just south of the main campus.

Page 300

Plymouth North High School
Plymouth, Massachusetts
REFERENCE
Kathleen McSweeney, Principal 
Plymouth North High School
41 Obery Street
Plymouth, MA 02360
508.830.4400  
SERVICES PROVIDED
• Concept Design
• Rain Garden Design
• Construction Documents
PROJECT STATUS
Completed 
PROJECT COST
Total Construction Cost $4.9m
BETA worked on the design team to create plans for a new high school as a part of 
Massachusetts Model School Program. The site design includes rain gardens, entry 
plazas, and a courtyard. Recreational facilities include tennis courts, a track, a synthetic 
football/ multi-use field, and two synthetic baseball fields. The school opened for its 
first year in the fall of 2012 and the site work was completed in 2013.

Page 301

Task Based Traffic & Safety Engineering Services 
Connecticut Department of Transportation
BETA was selected by the Connecticut Department of Transportation (CTDOT) in 2014, 2017, and again in 2021 to provide task-based 
traffic and safety engineering services in support of the Division of Traffic Engineering. Through these contracts, BETA has completed and 
continues to perform a wide range of traffic engineering and safety improvement assignments, including:
Computerized Traffic Signal System Replacements 
SPN 0170-0197 US Route 1 CTSS Replacement, Bristol -  10 Signals 
SPN 0131-0213 CT Route 10  CTSS Replacement, Southington - 9 Signals 
SPN 0153-0164 CT Route 85 CTSS Replacement, Waterford - 10 Signals 
These projects were initiated to replace aging traffic signal infrastructure on signalized corridors as part of CTDOT’s state of good 
repair program by installing new traffic signal equipment and replacing the existing Computerized Traffic Signal System (CTSS) 
communications. Projects included full replacement of traffic signal equipment and new fiber optic interconnect, as well as partial 
signal upgrades at intersections. The replacement of the CTSS communications system establishes reliable fiber 
optic communication between signalized intersections, with wireless communications to CTDOT’s Newington 
Administration Building, enabling implementation of advanced technologies to monitor traffic and reduce travel 
times. Specifically, the CTSS components included:
• Advanced traffic signal controllers to provide updated traffic signal and data collection functionality.
• Fiber optic interconnect among all project intersections to provide reliable, high bandwidth communications.
• Upgraded wireless communications back to the CTDOT’s central traffic signal control software.
The projects followed the 2021 Stewardship & Oversight Implementation Manual for ITS projects and statewide/
regional architecture requirements in accordance with 23 CFR 940.01-13, including a systems engineering 
analysis commensurate with the project scope and technology.
Clearance Interval Retiming 
SPN 173-454PL - District 3 (3/2015 - 7/2017) 684 Signals 
SPN 172-440PL - District 2 (10/2015 - 11/2017) 435 Signals
These tasks were initiated to reduce the number of severe crashes at signalized intersections. BETA retimed yellow, all-red, and pedestrian 
clearance intervals and updated pre-emption settings at state-owned and maintained traffic control signals in Districts 2 and 3. The tasks 
also included updating signal systems, coordinating yellow clearance times within closed-loop systems, and revising technical notes. BETA 
prepared updated signal plans and Timing and Maintenance forms for each modified traffic signal.
Road Diet Feasibility Study on Local Roads, SPN 170-3584 (Completed 2022)
This task evaluated the feasibility of implementing road diets on select municipally owned multilane undivided arterials to reduce crashes, 
improve traffic operations, and enhance bicycle and pedestrian accommodations. The project was conducted in three phases: data 
acquisition and initial screening, traffic modeling and analysis, and conceptual plan development.
Inventory and Upgrade of Municipally-Owned Traffic Control Signals, SPN 170-3585 (Completed 2023)
BETA conducted field and desktop reviews of up to 2,500 municipally owned traffic signals throughout Districts 1, 2, 3, and 4. The team 
compiled a GIS inventory of existing traffic signal equipment and developed recommendations for safety improvements, including 
dilemma zone detection, accessible pedestrian signals, retroreflective borders on backplates, and leading pedestrian intervals.
Rectangular Rapid Flashing Beacons on Local Roads, SPN 171-0468, SPN 172-0505, SPN 173-0516, SPN 174-0447 (Completed 2025)
This task involved designing rectangular rapid flashing beacons (RRFBs), PROWAG-compliant curb ramps, and associated signing and 
pavement markings at mid-block crossings on municipally owned roads throughout Districts 1, 2, 3, and 4 to improve pedestrian safety.
REFERENCE
Natasha Fatu, PE
State Safety Engineer 
CT Department of Transportation 
2800 Berlin Turnpike 
Newington, CT 06111
860.594.2731
PROJECT STATUS
Ongoing

Page 302

Appendix - Staff Resumes

Page 303

2026 | Najib O. Habesch | Page 1
Najib O. Habesch is a seasoned civil and transportation engineer whose career
spans over 40 years of public- and private-sector leadership in the planning, design,
and delivery of complex infrastructure projects across Connecticut. As Senior Vice
President at BETA Group, Inc., Najib leads the firm’s operations in Connecticut and
has played a central role in transforming urban environments through smart,
community-centered engineering solutions. Najib’s project portfolio includes some
of the region’s most innovative and award-winning transportation and streetscape
initiatives.
Najib serves as principal-in-charge of task-based traffic and safety engineering work
for the Connecticut Department of Transportation (CTDOT). This includes road
safety audits, crash data analysis, operational improvements, and concept
development for statewide high-priority corridors—supporting CTDOT’s Vision Zero
and Highway Safety Improvement Program (HSIP) initiatives. He also oversees
CTDOT ADA Title II Municipal Support Services, helping cities and towns meet
federal accessibility requirements by providing technical assistance, compliance
assessments, and transition plan development.
Oversight of technical assistance and compliance support for Connecticut
municipalities under ADA Title II. Services include accessibility assessments and
transition plan development to help communities meet federal requirements.
Directed numerous traffic and safety planning efforts across Connecticut, including
traffic calming master plans, traffic signal optimization, and modern roundabout
design for municipalities.
Led the design and implementation of the Bushnell Park North Complete Streets
Project, a transformative urban streetscape initiative reconnecting Bushnell Park to
downtown Hartford. The project included multimodal transportation
improvements, pedestrian-focused design, integrated green infrastructure, and
traffic calming elements that enhanced access, safety, and sustainability. Through
strategic design and stakeholder engagement, the project supported downtown
revitalization goals and received national recognition for its innovative, context-
sensitive approach to urban mobility and public space.
Principal-in-charge for statewide traffic and safety assignments supporting CTDOT's
Vision Zero and HSIP initiatives. Responsibilities include road safety audits, crash
data analysis, corridor operations improvements, and conceptual design for high-
priority locations.
Transportation
 BETA: Since 2011
 Total: Since 1983
 BS, Civil Engineering –
University of Maryland
(1983)
 FHWA Using the National ITS
Architecture for Deployment
 FHWA Synchro & SimTraffic
 UCONN CTI Context
Sensitive Solutions
 FHWA Systems Engineering
for Advanced Transportation
 Council of Minority
Transportation Officials
 Intelligent Transportation
Society of Connecticut – Past
President
 Institute of Transportation
Engineers
 Connecticut Construction
Institute
 American Society of Civil
Engineers
 American Public Works
Association

Page 304

2026 | Najib O. Habesch | Page 2
Managed transportation and infrastructure planning for Hartford’s minor league stadium, balancing stadium access with
neighborhood traffic circulation and multimodal needs.
Oversaw the design and implementation of advanced traffic signal technologies to optimize operations along a high-
volume arterial corridor.
Developed infrastructure readiness and economic development strategies for Connecticut’s deepwater ports, advancing
long-term multimodal logistics and waterfront revitalization efforts.
Led an intermodal access and feasibility study for locating a high-speed ferry terminal in Stamford, evaluating site
suitability and transportation connections.

Page 305

2026 | Jason Ouimet, PE, LEED AP | Page 1
Jason Ouimet is a dedicated Associate with experience working on a wide variety of
transportation and land development projects throughout Connecticut and
Massachusetts. He excels both working independently and as part of a team,
including in supervisory roles, and is committed to delivering efficient, accurate, and
innovative solutions while staying within budget. His experience includes roadway
and intersection design, streetscape improvements, multimodal transportation
facility design, hydrologic and hydraulic drainage design, drainage best
management practices, and site planning and design.
Performed reviews of 30%, 70%, and 90% design submissions, construction
documents, and cost estimates prepared by design consultants for various CRCOG
member town projects. Reviews focused on compliance with local, CTDOT, and
AASHTO standards, constructability, and overall quality control.
Design project manager for the reconstruction of Burnham Street and Sherwood
Drive. The town-funded project involved full-depth reconstruction of approximately
4,600 feet of roadway, including raising sections of Burnham Street, upsizing
culverts and drainage infrastructure for flood mitigation, and installing textured
flush and raised median islands to reduce vehicle speeds. The project also required
various ROW easements and environmental permits within East Hartford and South
Windsor.
Design project manager for roadway safety improvements along Upland Street,
Burdick Street, and Belltown Road adjacent to Barrett Park in Stamford. The project,
funded through a community connectivity grant, included new sidewalks, ADA-
compliant ramps, raised crosswalks, a median island, bump-outs, bicycle
lanes/sharrows, drainage improvements, decorative sidewalks and lighting, signage,
and landscaping.
Senior project engineer for the design of 3,000 LF of new streetscape improvements
along Farmington Avenue, an arterial roadway. Design elements included traffic
signals, bike lanes, on-street parking, bump-outs, raised crosswalks, bus stops with
shelters, textured medians, decorative sidewalks and lighting, drainage
improvements, signage, landscaping, and ROW coordination. Estimated
construction value: $10 million.
Transportation & Traffic
Engineering
 BETA: Since 2019
 Total: Since 2005
 BS, Civil Engineering –
University of Connecticut
(2005)
 PE – CT #0031242
 PE – MA #48699
 PE – RI # 13249
 LEED AP
 AutoCAD Civil 3D
 MicroStation
 Storm CAD
 Hydro CAD

Page 306

2026 | Jason Ouimet, PE, LEED AP | Page 2
Design project manager for the reconstruction of May, Summer, June, and Blinn Streets. The town-funded project
involved full-depth reconstruction of approximately 1,500 feet of roadway, including construction of new driveways,
sidewalks, ADA-compliant ramps, curbing, signage, pavement markings, and roadway drainage improvements.
Design project manager for the reconstruction of Poquonnock Road. The LOTCIP-funded project involved full-depth
reconstruction of approximately 3,000 feet of roadway and included replacement of existing concrete sidewalks, curbs,
pedestrian ramps, and minor stormwater infrastructure.
–
Senior project engineer for the design of pedestrian improvements along Route 7 and Aspetuck Avenue. The project,
funded through the Transportation Alternatives (TA) Program, included closing sidewalk gaps, extending the pedestrian
network, ADA-compliant ramps, a new pedestrian bridge over an existing stream, improvements to three traffic signals,
bus stops with shelters, landscaping, signage, and drainage improvements.
Project manager for the design of a 10-foot-wide multi-use path along Albany Avenue (Route 44) in Hartford. The project
spans approximately 3,000 feet between Bloomfield Avenue and Westbourne Parkway, with most of the corridor
adjacent to The Village for Families and Children. The multi-use path crosses three signalized intersections and two
bridges. Improvements included replacing an existing 5-foot sidewalk with a 10-foot-wide multi-use path, ADA
enhancements, traffic signal modifications, new and modified lighting, landscaping, grading, and improved access to
transit and nearby housing developments.
Senior project engineer for the reconstruction of 800 LF of Strawberry Hill Avenue and 870 LF of Fifth Street. The project
included replacement of the existing traffic signal and mill-and-overlay resurfacing of the roadway, with roadway
widening along sections of Fifth Street. Improvements along Strawberry Hill Avenue included shifting a portion of the
roadway five feet to improve vehicle and pedestrian safety at the intersection, including areas of full-depth reclamation
and full-depth reconstruction. Additional improvements included replacement and installation of concrete sidewalks,
curbs, ADA-compliant pedestrian ramps, utility pole relocations, minor drainage infrastructure, pavement markings,
high-visibility crosswalks, signage, and installation of a rapid rectangular flashing beacon (RRFB) along Fifth Street.
Design project manager for the reconstruction of Waller Road. The project involved full-depth reconstruction and
reclamation of approximately 750 feet of roadway and included replacement of existing curbs, partial driveway
reconstruction, roadway widening, large tree removal, new drainage pipes and structures, utility pole relocations, and
pavement markings.
Senior civil engineer during the final design phase of the project. Project elements included an urban boulevard with an
at-grade intersection at Orange Street, improvements to pedestrian corridors, sidewalks, ADA-compliant ramps,
protected bike lanes, and drainage and utility improvements. Assisted with drainage design and preparation of a
drainage report evaluating methods to alleviate frequent flooding within the corridor, as well as maintenance and
protection of traffic during construction.

Page 307

2026 | John Bertoli, LEED AP | Page 1
As Vice President, John “Jay” Bertoli brings more than 40 years of municipal
infrastructure design and management experience gained in both the public and
private sectors. He is thoroughly familiar with all aspects of civil, site, utility,
roadway engineering, estimating, and construction inspection with an emphasis on
project management and contracting methods.
Jay has performed design, construction administration, and management services
on a multitude of public infrastructure improvements over his career. He has also
been responsible for the complete design and/or served as a project/construction
manager for more than a dozen Connecticut Department of Transportation projects
during his career, specializing in state and municipal arterial, streetscapes, and local
road design, pavement management, rehabilitation methods and techniques,
construction engineering, administration, and management. Jay has also designed
and managed the construction of numerous public park projects, athletic fields, and
related projects over his career.
Project manager and construction coordinator for approximately 3,000 LF of
streetscape improvements on an arterial street with an ADT of more than 14,000
vehicles per day. The project has an estimated construction value of $9,500,000 and
includes three (3) signalized intersections and right-of-way activities.
Responsibilities included multi-agency coordination, utility coordination, oversight
of inspection staff, scheduling, claims, and risk analysis.
Construction coordinator overseeing inspection staff for various municipal roadway
reconstruction projects. Responsibilities include staff supervision, ensuring
compliance with Town requirements, field meetings, resolving issues, and client
meetings.
Project manager and construction coordinator for the design and construction of
improvements to the interior of Bushnell Park, including illumination, drainage, and
sidewalk construction. Responsibilities included design, scheduling, construction
oversight, field oversight, negotiating extra work, coordination with stakeholders,
agencies, and utilities. Construction value was $5,000,000.
Construction manager/coordinator for improvements to the 27-hole golf course,
including irrigation, pump station, bedrock wells, SCADA, permitting, drainage, and
related construction. Responsibilities included field oversight, scheduling,
construction oversight, negotiating extra work, verification of pay applications,
record keeping, coordination with stakeholders, agencies, and utilities. Construction
value was $5,000,000.
Civil/Site/Transportation
 BETA: Since 2011
 Total: Since 1984
 BS, Civil Engineering - Roger
Williams University (1984)
 LEED AP
 American Public Works
Association, Associate
Member
 Intelligent Transportation
Society (ITS) of Connecticut,
Former Director of
Membership

Page 308

2026 | John Bertoli, LEED AP | Page 2
Construction manager/coordinator for improvements to the 18-hole golf course, including cart paths, drainage, and
related construction. Responsibilities included scheduling, construction oversight, negotiating extra work, verification of
pay applications, record keeping, coordination with stakeholders, agencies, and utilities. Construction value is
$1,750,000.
Project/construction manager for 4,000 LF of complete street improvements around the perimeter of Bushnell Park. The
project was funded by an FTA grant. Responsibilities included construction oversight, coordination, field oversight, staff
supervision, and administrative services. The construction value was $11,600,000.
Project/construction manager for the design of sidewalk improvements for 5,000 LF of street, including ADA
improvements and utility coordination. Provided construction oversight and administration services. Construction value
was $2,200,000.
Project manager for design of roadway safety improvements, including landscaping, illumination, and drainage
improvements. Project value $1,500,000.
Project/construction manager for a single-lane roundabout at Park Terrace and Sigourney Streets, providing
construction oversight and administrative services. The construction value was $2,500,000.
Project/construction manager for the design of intersection safety improvements for 2 signalized intersections in
downtown Hartford. Construction value was $1,500,000.
Project/construction manager for the design and construction of street relocations and related improvements necessary
to construct a new $44,000,000 minor league AA ballpark (Yard Goats) in downtown Hartford. Construction value was
$7,800,000.
Project manager for road reconstruction with curbing, sidewalks, median islands, landscaping, and minor drainage
improvements. The project value was $350,000.
Project/construction manager for the design and relocation of domestic water, sanitary, and storm sewer utilities for the
construction of a new minor league baseball stadium in downtown Hartford. Construction value was $1,000,000.
Project manager for the design of 5,800 LF of primary arterial roadway and streetscape improvements, including
pavement design, traffic signal design of 10 intersections, drainage improvements, traffic calming, MPT, and rights of
way activities.

Page 309

2026 | Kwesi Brown, PE, PTOE | Page 1
Kwesi Brown, PE, PTOE, is an accomplished traffic and transportation engineering
leader with over two decades of experience delivering complex infrastructure
projects, leading multidisciplinary teams, and driving business growth across public
and private sectors. Known for his strategic leadership and technical expertise in
traffic engineering, multimodal planning, and safety-focused design, he has
successfully managed multimillion-dollar programs, strengthened client
partnerships, and mentored high-performing teams. As Vice President at BETA,
Kwesi brings a strong track record of operational excellence, innovation, and
industry leadership to support the continued growth and advancement of the firm’s
transportation practice.
Contract Manager for a five-year $10 million contract to provide Traffic and Safety
Engineering services to the Connecticut Department of Transportation. The contract
involves assisting the Department on various traffic and safety-related planning and
design assignments/projects statewide. Planning tasks include traffic counts, data
collection associated with traffic signals, capacity and queuing analysis, and crash
analyses, as well as safety and accessibility studies. Design tasks include design of
traffic signals and computerized traffic signal systems, Accessible Pedestrian Signals
(APS) and Rectangular Rapid Flashing Beacons (RRFBs) complete streets and ADA
design, highway and expressway signing design, railroad- highway at grade crossing
designs and preparation of maintenance and protection of traffic plans.
Construction phase tasks include design services during construction
and submittal reviews. Assignments to date include traffic and pedestrian signal,
and ADA upgrades at over 50 intersections statewide.
Project Manager for this project to replace existing traffic control signals at 10
intersections on US Route 6. The traffic signal replacement project includes the
upgrade of the existing infrastructure to the latest standards, such as mast
arms/span poles, signal head placement, upgraded signage, detection, accessible
pedestrian signals (APS) with pushbuttons and countdown signal heads. The project
also includes the installation of underground fiber optic interconnect between the
signals with wireless communication to the CTDOT Traffic Operations center. The
project also includes construction/reconstruction of curb ramps, blended
transitions, sidewalk extensions, landing areas, detectable warning surfaces,
realignment of skewed crosswalk pavement markings and associated adjustments
to stop bars and detector locations, review of signal timings (including clearance
intervals, pedestrian timings, and coordination information where applicable), and
evaluation of any existing “When Flashing Stop Ahead” signs tied to a traffic signal
or other signs with flashers on approaches to the traffic signal. Furthermore,
pavement markings will be updated as necessary, and potential guide rail revisions
Traffic Engineering
 BETA: Since 2026
 Total: Since 2000
 MS, Civil Engineering,
University of Connecticut
(2024)
 BS, Civil Engineering,
University of Science &
Technology, Ghana (2000)
 Professional Engineer, CT
 Professional Traffic
Operations Engineer
 Connecticut Institute of
Transportation Engineers –
Past President
 Intelligent Transportation
Society of Connecticut
 American Council of
Engineering Companies – CT
Chapter

Page 310

2026 | Kwesi Brown, PE, PTOE | Page 2
in conjunction with the installation of new mast arms, span poles, or pedestals implemented. The project is currently in
design.
Project Manager for this project to replace existing traffic control signals at 9 intersections on Route 10 in Southington.
The traffic signal replacement project includes the upgrade of the existing infrastructure to the latest standards, such as
mast arms/span poles, signal head placement, upgraded signage, detection, accessible pedestrian signals (APS) with
pushbuttons and countdown signal heads. The project also includes the installation of fiber optic interconnect between
the signals with wireless communication to the CTDOT Traffic Operations center. The project also includes
construction/reconstruction of curb ramps, blended transitions, sidewalk extensions, landing areas, detectable warning
surfaces, realignment of skewed crosswalk pavement markings and associated adjustments to stop bars and detector
locations, review of signal timings (including clearance intervals, pedestrian timings, and coordination information where
applicable), and evaluation of any existing “When Flashing Stop Ahead” signs tied to a traffic signal or other signs with
flashers on approaches to the traffic signal.
Served as Project Manager for this project to replace existing traffic control signals at 14 intersections on State roads in 9
towns. The traffic project included the new mast arms/span poles, signal heads with backplates, upgraded signage,
video and radar detection, accessible pedestrian signals (APS) with pushbuttons and countdown heads. The project also
included ADA sidewalk and ramp improvements. Bid phase support and Design Services during Construction (DSDC)
were provided including submittals reviews, RFIs, mast arm working drawing reviews and change orders. The project is
currently in the construction phase.
Project Manager for this study to convert downtown streets including Chapel Street, George Street, York Street and
Church Street from one-way to two-way. The study involved extensive data collection and traffic analysis to determine
the impact of future traffic diversions and redistribution due to the two-way conversion. Additionally, two-way roadway
improvement concepts were developed and refined in concert with the public and project stakeholders into preferred
multi-modal concepts. The plans were advanced to preliminary design with associated cost estimates were developed.
Project Manager for the design of pedestrian improvements along Summer Street in downtown Stamford at four key
intersections: Hoyt Street, North Street, Broad Street, and Main Street. Improvements provide increased pedestrian
visibility to motorists, provide larger areas of refuge at intersection corners, and reduce the traveled distance within
crosswalks. The project designs included new accessible pedestrian signals, reconstruction of intersection corners and
sidewalk ramps to comply with federal Americans with Disabilities Act requirements, installation of new curb geometry
for “bump-outs”, streetscape architectural materials, colored thermoplastic crosswalks, and modifications to existing
drainage.
Project Manager for the $2.8 million signalization and roadway safety improvement project on Route 177 in Farmington,
CT. The project involved the upgrade of three traffic signals and roadway improvements at the intersections of South
Main Street (Route 177) at New Britain Avenue, Mill Street, and Route 4, as well as the formalization of a mid-block
crossing at the intersection of Route 177 at the Farmington River Trail with the installation of a Rectangular Rapid
Flashing Beacon. Other tasks included preparing construction drawings and specifications, providing bid assistance, and
providing construction administration services. This project involved extensive coordination with the Town and the
Connecticut Department of Transportation.

Page 311

2026 | Laura Krause | Page 1
Laura contributes her comprehensive training in physical sciences, GIS mapping, and
regulations to varying types of environmental consulting and planning projects. She
has been working in the environmental consulting and engineering field and has
gained valuable knowledge in ecology, environmental permitting and planning, and
hazardous waste assessment in Massachusetts. Her diverse background in
environmental consulting allows her to evaluate sites from many perspectives.
With 13 years of experience working as an environmental professional, Laura has
played a key role in providing wetland delineation and permitting services on
dozens of projects for both public and private entities. She has permitted over a
dozen transportation-related projects ranging from roadway improvements and
bridge replacements to rail trails. Laura’s strong background in the regulations
governing development and redevelopment under local, state, and federal
jurisdiction allows her to handle a variety of projects efficiently and successfully.
Laura is also experienced in Invasive Plant Identification and Management,
Geographic Information Systems (GIS), and Wetland Replication Implementation.
She has prepared dozens of Invasive Species Control Plans; provided design
guidance to developers using maps depicting areas of jurisdiction under local, state,
and federal law; and prepared wetland replication plans in accordance with federal,
state, and local regulations.
Environmental Permitting Manager for the MassDOT Route 20 Reconstruction
design/build project in Charlton and Oxford, Massachusetts, which included
reconstruction of multiple intersections, a one-acre wetland replication area, two
bridge replacements, four culvert replacements, and safety improvements.
Provided technical review of permit amendments/applications associated with
design changes and reviewed design plans for conformance with regulatory
requirements.
Environmental Permitting Manager and Environmental Compliance Manager
overseeing environmental permitting and compliance in support of the MassDOT
Route 125 Basiliere Bridge Replacement Design/Build Project in Haverhill,
Massachusetts. Provided technical review of permit amendments/applications
associated with design changes and reviewed design plans for conformance with
regulatory requirements. These permits included amended USCG Bridge Permit,
Section 404 and 408 permit from USACE, Section 401 Water Quality Certification,
and a Conservation and Management Permit from the Division of Marine Fisheries.
Continuing to provide oversight during progress meetings to document pre-
construction compliance items.
Environmental Services
 BETA: Since 2018
 Total: Since 2013
 MS, Env. Engineering – WPI
(2026)
 BS, Chemistry - Reed
College, (2013)
 Certificate in GIS – Pace
University
 Certificate in Invasive Plant
Management – UMass
 OSHA 40 Hour HAZWOPER
Training and 8 Hour Annual
Refresher Courses
 Stormwater Management
Courses – UNH
 Soil Science Certificate - UNH
 NAACC Lead Observer and L1
Coordinator
 EPA CGP Inspector Certification
 Massachusetts Association of
Conservation Commissions
 Licensed Site Professional
Association (LSPA)
 American Chemical Society
(ACS)
 Association of Massachusetts
Wetland Scientists
 Society of Wetland Scientists
 WTS - Boston

Page 312

2026 | Laura Krause | Page 2
Lead scientist and project manager overseeing permit compliance for a Design/Build Project during construction of the I-
495 Bridges over the Merrimack River at the Haverhill and Methuen municipal boundary. As an Environmental Monitor
on this project, provides reviews of contractor-submitted documents, coordinates and oversees permit amendments
during the Design/Build phase, conducts regular Site inspections to document field conditions, and identifies action
items for environmental compliance, as well as prepares/reviews compliance reports.
Oversaw the preparation of an Environmental Assessment to demonstrate compliance with NEPA for the proposed
reuse of the former Uniroyal facility in Chicopee that involves filling and grading along a USACE-controlled flood control
structure. Developed narrative descriptions of regulatory compliance, site conditions, and anticipated permitting, and
drafted a Finding of No Significant Impact for USACE concurrence. Assisted concurrently with the development of a
Section 408 permit application to USACE.
Lead scientist responsible for providing ecological and environmental services in support of the MassDOT Route 44
Reconstruction Project in Taunton, Massachusetts, which included adding a new travel lane in each direction, bus stop,
and bicycle/pedestrian infrastructure. Provided resource area identification and delineation of the onsite wetlands and
Bank and prepared/submitted documents for review under the Massachusetts Wetlands Protection Act, including
preparation of the Notice of Intent filing and Detailed Wildlife Habitat Evaluation due to the proposed impacts to BLSF
and Bank. Represented MassDOT during the NOI public hearing and assisted MassDOT in receiving a Superseding Order
of Conditions from MassDEP through the preparation of a Riverfront Area Restoration Plan. Currently serving as the lead
scientist and project manager overseeing permit compliance during construction.
Prime contributor in preparing environmental review documents and permitting applications for the Route 79/Davol
Street Corridor Improvement Project. Developed comprehensive environmental documentation, including an Individual
Categorical Exclusion under NEPA, various permits and certifications, and an Environmental Notification Form under
MEPA. Defined coastal resource boundaries, conducted sediment sampling, and prepared environmental contract
specifications. Presented the project's environmental impacts and requirements at multiple public and regulatory
meetings. Prepared environmental specifications, reviewed contractor submittals, and coordinated permit amendments
during the Design/Build phase.
Participated in a team identifying and delineating wetland resources for a proposed shared-use trail. Defined boundaries
of Bordering Vegetated Wetland, Bank, and Mean Annual High-Water using the US Army Corps of Engineers guidelines.
Conducted a Detailed Wildlife Habitat Evaluation per Massachusetts inland wetlands guidance. Led the preparation of
environmental permitting applications, including those for the US Army Corps of Engineers General Permit, Section 401
Water Quality Certification, and various Massachusetts state environmental regulations.
Prepared a Notice of Intent under the MA Wetlands Protection Act for repairing an existing spur connecting to the
MBTA's new maintenance facility. Prepared the Stormwater Pollution Prevention Plan (SWPPP) and electronic Notice of
Intent for NPDES Construction General Permit coverage. Reviewed previous delineations of resource area boundaries
and conducted construction monitoring to ensure compliance with the Order of Conditions and SWPPP. Lead scientist in
completing SWPPP compliance inspections and reporting, as well as senior scientist on permit closure documentation.
Prime contributor to the environmental permitting team for the Beaver Street Bridge replacement in Framingham, MA.
Conducted resource area delineation to support project design. Prepared permit applications under the Massachusetts
Wetlands Protection Act and Section 404 of the Clean Waters Act.

Page 313

2026 | Joseph R. McLoughlin II, LSP, LEP | Page 1
Joe has 34 years of experience in the environmental consulting field, providing a
wide range of environmental services to clients across New England. He directs a
diverse staff of scientists, engineers, and risk assessors conducting environmental
assessments, site remediation, brownfields assessments, soil management,
regulatory compliance, and indoor air quality assessments.
Project manager for Phase I, II, and III Environmental Site Assessment at an
approximately 14-acre former tobacco farm. Prepared and submitted filings to the
Connecticut Department of Energy and Environmental Protection under the
Voluntary Cleanup Program. Oversaw the excavation and on- and off-site
management of pesticide, lead, and petroleum-impacted soil.
Conducted numerous Phase I Environmental Site Assessments and Limited
Subsurface Investigations on City-owned properties and properties targeted for
acquisition. Rendered Licensed Environmental Professional (LEP) opinions on the
applicability of the CTDEEP Transfer Act. Oversaw numerous Hazardous Building
Material Investigations on buildings slated for demolition and redevelopment.
Providing soil management services for the City’s Bushnell Park North project.
Oversaw the design and implementation of a Sampling and Analysis Plan for several
miles of a sewer separation project. Managed the advancement of soil borings,
installation of monitoring wells, and collection and laboratory analysis of soil and
groundwater samples. Prepared an Environmental Data Report summarizing
findings, conclusions, and recommendations and prepared specifications for the
handling and management of contaminated and polluted soil and groundwater.
Project manager for groundwater pump and treat and free product removal system.
Oversaw quarterly groundwater monitoring and operations and maintenance of
remedial system and bi-weekly Rhode Island Pollution Discharge Elimination System
(RIPDES) monitoring with quarterly reporting to RIDEM. Designed and installed a
modified groundwater treatment system including groundwater depression pumps,
Spill Buster product recovery units, and treatment shed modifications.
Served as a Licensed Site Professional overseeing Utility-related Abatement
Measures (URAMs) for projects including Concord Street, Downtown Utilities,
Grant/Pond, Union Avenue, Speen Street, Worcester Road Pump Station, and
Prospect Street. Conducted preliminary environmental assessments for numerous
utility projects and assisted the Town in developing its in-house Waste Management
Policy and asbestos policy. Provided Licensed Site Professional services in response
Environmental Services
 BETA: Since 2004
 Total: Since 1992
 MS, Water Resources,
Stanford University (1992)
 BS, Civil Engineering –
Worcester Polytechnic
Institute (1991)
 OSHA 40 – Hazardous Waste
Operations (1993)
 OSHA 8 – Hazardous Waste
Operations (2023)
 OSHA 8 – Asbestos-Cement
Pipe Worker Safety
 Licensed Site Professional,
MA #2039
 Licensed Environmental
Professional, CT

Page 314

2026 | Joseph R. McLoughlin II, LSP, LEP | Page 2
to a hydraulic fluid spill from a Town-owned trash truck and oversaw the management and disposal of asbestos-
containing soil and pipe.
Acted as Licensed Site Professional for several Brownfields properties owned by the City and responded to an
Administrative Consent Order related to violations of an Activity and Use Limitation. Prepared Phase I Initial Site
Investigations (ISIs) and Tier Classifications for multiple City-owned properties, conducted annual Temporary Solution
monitoring and reporting for the Taunton DPW facility, and provided underground storage tank inventory and
compliance assistance. Also oversaw numerous Utility-related Abatement Measures (URAMs) as part of city-wide sewer
improvement projects.
Served as Lead Qualified Environmental Professional for the implementation of a $300,000 Brownfields Assessment
Grant. Conducted four ASTM- and AAI-compliant Phase I Environmental Site Assessments and five Phase II
Environmental Site Assessments, and prepared two Remedial Plans. Assisted with oversight and reporting for all aspects
of grant management and helped leverage initial assessments into additional funding for Brownfield sites in
Winchendon, Lunenburg, and Groton.
Assisted Town of Winchendon in obtaining and implementing $450,000 grant from MassDevelopment for
environmental and LSP services at a former foundry that is being redeveloped into a brewery. Provided LSP services
for the Town of Groton in follow-up work after EPA implemented a $2,000,000 removal action to address imminent
hazards associated with lead in soil found during our MRPC assessment work. Provided LSP services for the Town of
Lunenburg to follow up after EPA conducted a $200,000 Targeted Brownfield Assessment at a property initially
assessed during our MRPC assessment work.
Provided Licensed Site Professional services to assess and develop a remediation plan addressing Imminent Hazard
arsenic levels in soil at the Pirone Park playground. Developed bid specifications for soil excavation and disposal and
oversaw the implementation of an Immediate Response Action (IRA) with the selected contractor. BETA’s Landscape
Architecture group subsequently designed and specified a new playground to replace the existing one.
Oversaw the implementation of Brownfields investigations at petroleum and hazardous materials sites under a U.S. EPA
Brownfields Assessment grant. Managed an extensive investigation of PCB-impacted soil at the City Pier property and
developed and implemented a risk-based investigation and cleanup plan under EPA’s TSCA program. Worked directly
with MassDEP, MassDevelopment, and the Seaport Council to leverage multiple Brownfields funding sources to assess
the site and advance a comprehensive cleanup plan.
Conducted a Phase I Environmental Site Assessment and Limited Subsurface Investigation for a real-estate transfer.
Identified chlorinated solvent contamination in soil, groundwater, soil gas, and indoor air. Overseeing a Phase II
Comprehensive Environmental Site Assessment for submittal to MassDEP. Filed a Permanent Solution with
Conditions and removed an Activity and Use Limitation from the Site to allow for sub-dividing of the property.
Prepared comprehensive Spill Prevention Control and Countermeasure (SPCC) Plans in accordance with applicable
U.S. Environmental Protection Agency (EPA) requirements. Provided on-site SPCC training classes for personnel
involved with the handling of petroleum at each hospital.

Page 315

2026 | Randall L. Collins Jr., PLA, ASLA | Page 1
Randy is a Vice President at BETA with nearly 40 years of experience in landscape
architecture. He has worked on projects throughout New England, ranging from
residential estates to aesthetic improvements to regional highways. Mr. Collins has
comprehensive experience working in the public sector. His responsibilities include
the development of conceptual design ideas, public participation and outreach,
coordination with local and state officials, presentations to historic commissions
and other stakeholders, development of design details, and the preparation of final
design plans. Mr. Collins’ involvement also includes construction supervision and
oversight.
Prepared a master plan for a recreation facility for the new middle school and
community use. Designed ball fields with underdrains to remove stormwater, tennis
courts, a walking trail, parking, and a concession stand. Prepared construction
documents for phased project implementation.
Designed renovations including a new football field with bleachers and lights,
softball fields, a baseball field, an in-line hockey rink, paths, benches, ornamental
lighting, park signs, and plantings. Developed naturalistic planting for the newly
daylighted Beaver Brook and provided construction observation services.
Prepared a master plan to update and restore historic elements of this +100-year-
old park and provide new recreational opportunities including basketball courts,
volleyball, a splash park, playgrounds, baseball fields, and enhanced fishing access
to Cass Pond. Designed parking lot improvements and utility upgrades.
Created a vision for the entrance and concession stand area of this large-scale
recreational facility located in a former brownfields site. Developed final design
documents for three soccer fields, a bike trail, a pitch and putt course, and parking.
Integrated vehicle, pedestrian, and bicycle circulation into design considerations.
Prepared a master plan for a new middle school, including roadway and parking lot
layout, bus loop, sports fields, screening of adjacent properties, and enhancing
plantings.
Prepared a Master Plan for a new high school and associated facilities under the
Massachusetts Model School Program. Coordinated with school and town officials
to resolve issues related to vegetated screening, sports fields and equipment, and
re-use of memorial elements. Prepared and presented design concepts to the
Landscape Architecture
BETA: Since 2009
Total: Since 1987
 BS, Plant Science/Landscape
Architecture, University of
Rhode Island, 1986
 Registered Landscape
Architect
RI #271
CT #1155
 Certified Low Impact
Development Master
Designer (RI CRMC)
 Member, American Society
of Landscape Architects

Page 316

2026 | Randall L. Collins Jr., PLA, ASLA | Page 2
Norwood Planning Board and the general community. Developed final plans and specifications for landscape materials
and hardscape features, including granite walls and plaza paving, walkways, athletic fields with a 2,000-person-capacity
grandstand, press box, and synthetic turf football/track and field with resilient surface track materials.
Project manager for a $14 million “Complete Streets” project in Bushnell Park North, which included a road diet for
existing roads and focused on pedestrian safety and community access. Designed a grand promenade and landscape
enhancements including LID elements, ornamental lighting, pedestrian amenities, and new plantings.
Project manager for the award-winning master plan project to honor Stamford’s veterans and enhance safety and
connectivity in Veterans Memorial Park. Led design charrettes with stakeholders to develop a final master plan
unanimously supported by the committee. Upgrades include an enhanced plaza with a central memorial feature, an
amphitheater built into the re-graded hillside, lighted pathways, benches and landscaping, and improved connectivity
from the bus stop to the surrounding buildings.
Project manager for the restoration and preservation of a historic park. Recommended trail rehabilitation, drainage
improvements, and streambank repairs and stabilization. Developed wayfinding and interpretive signage and oversaw
invasive plant removal. Managed extensive construction phase, including environmental permitting and public outreach.
Provided master planning and construction documentation for improvements to the historic seaside Wickford Village,
focusing on historic preservation and pedestrian safety. Presented numerous design options to gain both public and
local historic commission approval. Designed intersection modifications that increase pedestrian safety, paver
crosswalks, ornamental lighting, and enhancements to Library Park and the waterfront while respecting the village's
historic character.
Project manager for the development and design of roadway, traffic, and streetscape improvements in Dedham’s
Central Business District. Led community outreach and meetings, focusing on enhancing pedestrian safety with wider
sidewalks, curb extensions, reduced crossing distances, and improved signal phasing. Upgrades also included
ornamental lighting, brick surfaces, bike racks, granite curbing, and streetscape plantings.
Project manager and lead landscape architect for the design concepts for the reconstruction of North Square in Boston’s
North End. Treatments include ornamental lighting, brick and granite surfaces, bike racks, and sidewalk enhancements.
Project features include circulation modifications, pavement rehabilitation, new curbing, widened sidewalks, street
trees, and textured crosswalks.
Developed conceptual design ideas for improvements to a one-mile section of Route 9 in Shrewsbury, including
streetscape and pedestrian safety improvements as well as suggestions on how the adjacent buildings could be
aesthetically improved. Provided final design documents for road and sidewalk improvements.
Developed site plans for a new library as part of the Stillwater Mill Complex Redevelopment. Included a new roadway
connection, on-street parking, a riverwalk with event space, and a pedestrian connection to the adjacent Town
greenspace. Incorporated artifacts found during demolition into the site design.

Page 317

2026 | Christopher R. Cronin, PE | Page 1
Mr. Cronin, with 36 years of civil/environmental engineering experience, specializes
in wastewater, solid waste, stormwater, and environmental science. As Senior Vice
President at BETA, he's led diverse projects, encompassing wastewater pumping
and collection systems, construction administration, facility planning, wastewater
process, and stormwater system design. He has previous experience in landfill
closure and underground storage tank assessment.
Assisted in developing a draft Integrated Master Plan for Fall River’s wastewater
and stormwater systems. Created conceptual solutions for flooding and sanitary
sewer overflow areas. Conducted field investigations and developed resolutions for
identified infrastructure issues.
Project manager for design of 2,500 linear feet of replacement sewer and Cured-In-
Place pipe lining of 950 linear feet of 12-inch diameter sanitary sewer, to provide
additional system capacity and fortify existing infrastructure. Prepared
environmental assessment and obtained appropriate approvals to allow funding of
the project through the State Revolving Loan Fund in approximately 6 months.
Provided construction management for the $1.5-million-dollar project.
Prepared a comprehensive wastewater facility plan evaluating existing collection
system infrastructure, projected service needs, and long-term capital improvements
to support future municipal planning.
Prepared a comprehensive wastewater facility plan evaluating existing collection
system infrastructure, projected service needs, and long-term capital improvements
to support future municipal planning.
Project manager for Town-wide Infiltration/Inflow Analysis. System consists of 44
miles of gravity sewer and 44 sewage pumping stations. Project included an analysis
of pump run times compared to rainfall events and manhole inspections.
Prepared the Facility Plan Reaffirmation and Amendments and conceptual design
alternatives for upgrading the Centerville Pump Station. Oversaw construction for
the installation of five pumping stations and ten miles of new sewers. Managed $4
million, $3 million, and $3.2 million sewer extension projects, including new above-
grade package pumping stations at Sheraton Park, Old Buttonwood, and Capron
Farms.
Civil Engineering,
Water and Wastewater
Engineering
BETA: Since 1998
Total: Since 1990
 BS, Civil Engineering
Villanova University (1990)
 Envision Sustainability
Professional
 OSHA 40 – Health and Safety
 OSHA 10 – Construction
Safety
 OSHA 8 – Supervisory
 Professional Engineer
RI #8509
CT #27587
 American Society of Civil
Engineers
 Board Member, Providence
Engineering Society

Page 318

2026 | Christopher R. Cronin, PE | Page 2
Project engineer responsible for determining future flows, evaluation of available capacity in the existing collection
system and design of a new sewer extension to service new Town Houses planned for construction on the Bryant
University Campus. Responsible for providing engineering services associated with the evaluation of the existing sanitary
collection system and design of a new sewage pumping station in support of a new townhouse dorm on the Bryant
University Campus.
Evaluated and designed improvements for Washington Highway and Omega Pumping Stations, including pump
replacements, piping, and force main installations. Other improvements included new heating & ventilation and
electrical improvements. Wrote Operations & Maintenance Plan and provided operational training. Managed
construction services for the $5 million project.
Designed a 25 MGD wastewater pumping station featuring five 115 HP pumps and two 24-inch force mains to handle
varying flow conditions. Implemented a PLC-based pump control system, standby power generator, and an advanced
level control system. Considered unique design challenges, including a 32-foot-deep structure near the Taunton River
and a former Manufactured Gas Plant site, with an estimated project cost of $15 million using a progressive design-build
method.
Managed the design of a pre-cast submersible wastewater pumping station with two submersible pumps, space for a
third, and a PLC-based control panel. Included a standby power generator and level control system, and provided
construction management services for the $1 million project.
Designed and managed the construction of a replacement pre-cast submersible pumping station with three variable
frequency drive pumps. Incorporated a standby power generator and a separate room for control panels. Provided
construction management services for the $1.4 million project.
Designed replacement of 72” diameter screw pumps, including roof structure removal and permanent station bypass.
Managed construction services for the $1.5 million project.
Designed and managed the replacement and upgrade of pumps and control systems for the Constitution Street Pumping
Station. Supervised construction of the $1 million improvements, including extensive flow bypass.
Designed and managed the replacement and upgrade of pumps and control systems at Mount Hope Pumping Station.
Oversaw the $1 million project, ensuring effective flow bypass during construction.
Recommended and designed upgrades for Silver Creek Pumping Station, including new submersible pumps and control
systems. Managed the $1.3 million construction, involving extensive flow bypass.
Assessed and recommended improvements for a combined sewer overflow structure experiencing dry weather
overflows. Designed rehabilitation of the bypass structure, new gravity sewer pipes, and replacement of flow control
devices.

Page 319

2026 | Christopher W. Jones, PE | Page 1
Chris is the Vice President of BETA’s structural engineering services group. With 34
years of experience specializing in structural engineering, Chris is versed in the
inspection, design, and construction of a wide range of structure types, including
bridges, water and wastewater treatment and distribution structures, industrial
buildings, and retaining walls. His project experience has included entirely new
structures, as well as both major rehabilitations and minor repairs to existing
structures. His bridge designs have ranged from simple culvert replacements to
complex historic covered bridge rehabilitations.
Project manager for updating the town's ten-year-old Management Plan for 18
town-owned bridges and culverts. Responsibilities included site inspections,
documentation, repair recommendations, prioritizations, and budgetary cost
estimates. Also served as a team leader for some bridge inspections.
Structural project manager for the rehabilitation of a 1900-square-foot wastewater
pump station. The project involved replacing the above-grade building with a new
masonry structure and repairing the concrete foundation walls of the dry well.
Project engineer for designing structural repairs and retrofits to various structures
at the facility, including final clarifier tanks.
Project engineer overseeing the structural design improvements to the headworks
building at a wastewater treatment plant. The project included modifications to the
existing sluiceways and the addition of aluminum lift assemblies, gratings, stairs,
and handrails.
Project engineer supervising the structural design of a new 6,300-square-foot water
pump station. The design featured a combination of masonry and cold metal
framed shear walls, open web steel joists, and steel columns framing a clerestory.
Project engineer supervising the design of a wastewater pump station and attached
7500 CF wet well.
Assisted with the design of a new return sludge pumping station and final clarifiers
for the Field’s Point Wastewater Treatment Facility. Also designed smaller
reinforced concrete structures, including a meter/valve chamber and a splitter box,
and miscellaneous renovations to existing structures.
Structural Engineering
 BETA: Since 2001
 Total: Since 1993
 BS, Civil Engineering -
Worcester Polytechnic
Institute (1992)
 FHWA–NHI Safety
Inspection of In-Service
Bridges
 Professional Engineer
MA #41025
CT #23720
RI #8367
NH #16117

Page 320

2026 | Christopher W. Jones, PE | Page 2
Project engineer assisting with the design of a new wastewater pump station.
Project engineer for designing the replacement structural slab for an underground pump station.
Assisted with the design of a new multipurpose building for storage space, office space, and a truck washing bay at the
Field’s Point Wastewater Treatment Facility. The structure was designed to sit safely atop an existing 7-foot diameter
effluent conduit. Additional improvements included repairing cracked sluice gate operator supports and providing new
aeration tank pipe supports.
Assisted with the design of a new three-story solids handling facility at the Field’s Point Wastewater Treatment Facility.
Designed a new four-story floor infill for an existing incinerator building being converted to storage space, as well as
miscellaneous structures, including an oil tank containment structure and a lime silo support.
QA/QC reviewer responsible for bridge quality assurance/quality control review of the complete replacement of a large
culvert in Wilton, Maine. The existing metal plate pipe arch will be replaced with a 24-foot span concrete box
culvert. The bridge will be closed for 3 weeks to allow for construction.
Structural manager for designing a 1,300-foot-long elevated timber boardwalk through a salt marsh. The boardwalk
features repetitive 15-foot spans and a 36-foot span with integrated overlooks, using treated timber, tropical
hardwoods, and galvanized steel helical piles to minimize impact on the marsh.
Structural manager for the superstructure replacement of a 45-foot-span bridge as part of a 2,800-foot roadway
reconstruction. Utilized butted prestressed concrete deck beams and managed design complexities due to low
freeboard, proximity to an intersection, staged construction for pedestrian traffic, and utility accommodations.
Project manager for replacing a 16-foot-span bridge with a 36-foot-span bridge to meet stream crossing standards and
simplify water control during construction. Managed design challenges including a nearby sewage pump station, varied
bedrock and clay conditions, and raising a gravity sewer main to reduce streamflow risks.
Project manager for replacing a three-span 70-foot bridge with an 83-foot single-span structure meeting stream crossing
guidelines. The project included widening the bridge to two lanes, using New England Deck Bulb Tee Beams, and
constructing with precast concrete abutments and piles during a limited road closure.
Project manager for designing an 80-foot-span prefabricated steel truss bridge. Coordinated closely with permitting
agencies for construction within a regulated floodway.
Quality control manager for designing a three-span 60-foot timber pedestrian stream crossing. The design incorporated
galvanized helical piles and supported new sidewalks along Route 7.

Page 321

2026 | Danny P. Rebelo, PE | Page 1
Danny Rebelo has over 24 years of diverse experience in civil and municipal
infrastructure projects, specializing in the design and construction inspection of
roadways, drainage, wastewater, and waterworks for communities and agencies
across Connecticut and Massachusetts. Danny has proven expertise in managing
project budgets and schedules while delivering high-quality design and construction
inspection services that meet or exceed client expectations.
Project engineer responsible for the drainage improvements at four failing trench
drains at utility dense streetscape bump-outs on Park Street. Developed contract
drawings, specifications, and estimates. Responsibilities included communicating
with utilities, design, drawings, specifications, and estimating.
Project engineer for the design of 700 LF of sidewalks abutting an established stone
wall around Bushnell Park Pond as part of a major pond dredging and restoration
project. Developed contract drawings, specifications, and estimates.
Responsibilities included communicating with local staff and working on design,
drawings, specifications, and estimates.
Project engineer for the reconstruction of pedestrian ramps at dozens of locations
around the City of Hartford. Provided value engineering for the drawings,
specifications, and estimates.
Chief construction inspector for a $9.5 million-dollar municipal streetscape project
on 2,785 LF of a critical mixed-use principal urban arterial road, including concrete
base, drainage improvements, brick work, sidewalks, elevated crosswalks, bump-
outs, curbing, ornamental lighting, and traffic control signaling at three
intersections. Responsibilities included submittal review, construction inspection
services in accordance with CTDOT procedures, keeping detailed records, and
coordinating with the contractor, client, and residents. Maintained modern
electronic records to minimize errors and maintain high rates of efficiency.
Construction inspector for a $3.3 million-dollar municipal roadway project on 5,138
LF of critical mixed-use arterial roads of Moody Road and Cranbrook Boulevard by
full-depth reconstruction and 1,884 LF of local residential roads by reclamation.
Responsibilities included submittal review, construction inspection services in
accordance with CTDOT procedures, keeping detailed records, and coordinating
with the contractor, client, residents, and designer. Performed all stormwater
Civil Engineering
 BETA: Since 2018
 Total: Since 2002
 BS, Civil Engineering –
Northeastern University,
Magna Cum Laude and
Honors Program (2002)
 OSHA 10 (2011)
 OSHA 8 Class II Asbestos
(2014)
 OSHA Confined Space Entry
(2011)
 NETTCP Concrete Inspector
Certification (March 2025)
 NETTCP Paving Inspector
Certification (March 2025)
 EPA CGP 2022 Site Inspector
Certification (2024)
 Toastmasters International
 Professional Engineer: MA
#52043 (2015)
 Professional Engineer: CT
#0025508 (2007)

Page 322

2026 | Danny P. Rebelo, PE | Page 2
inspections and reports per DEEP General Permit as modified on 11/25/2022. Maintained modern electronic records to
minimize errors and maintain high rates of efficiency.
Construction inspector for CCGP-funded sidewalks to improve walkability along the Elm Street corridor, including
pedestrian signaling at CT State Community College, Asnuntuck. Responsibilities included submittal review, construction
inspection services in accordance with CTDOT procedures, keeping detailed records, and coordinating with the
contractor, client, and residents.
Construction inspector for CCGP-funded upgrades to crosswalks and ramps at several separate locations.
Responsibilities included submittal review, construction inspection services in accordance with CTDOT procedures,
keeping detailed records, and coordinating with the contractor, client, and residents. Transitioned antiquated standard
paper record-keeping to a dynamic electronic system.
Construction inspector for the traffic control system at the intersection of Route 1 – East Main Street & Weed Avenue
and sidewalk ramp replacement portion of the project. Responsibilities included submittal review, construction
inspection services in accordance with CTDOT procedures, keeping detailed records and coordinating matters with the
contractor, client, and residents.
Full-time construction inspector for a municipal utility and multi-street reconstruction project. Responsibilities included
performing construction and inspection services in accordance with CTDOT procedures, which include keeping detailed
records and coordinating with the contractor, client, and residents.
Construction inspector for a 3,198 LF roadway reconstruction project on a critical mixed-use arterial road.
Responsibilities included submittal review, construction inspection services in accordance with CTDOT procedures,
keeping detailed records and coordinating with the contractor, client, and residents.
Full-time construction inspector for a municipal utility and multi-street reconstruction project. Responsibilities included
performing construction and inspection services in accordance with CTDOT procedures, keeping detailed records and
coordinating with the contractor, client, and residents.
Designed the civil/site portion for two fat, oil, and grease separation units. Managed the project between the client,
local staff, and various discipline groups from a remote office. Provided construction administration services.
Project engineer for the design of a 7,000-feet 24-inch DIP secondary force main and rehabilitation of 20-mgd Broad
Street Pumping Station. Developed Pipe-Flo models and produced contract drawings through Civil 3D. Designed the
mechanical piping system and selected pumps for dual-force main operation. Worked with drawings, specifications,
subconsultants, and vendors.
Project engineer for the design of a 1.0-mgd wastewater pumping station and a 3,000-feet 10-inch force main.
Work production of contract drawings and specifications, Pipe-Flo models, pump selections, technical memos, site
layout, communication with vendors, and working closely with the client.

Page 323

Appendix - Contract Exceptions

Page 324

Page 5 of 7
5. Professional Liability. One Million Dollars ($ 1,000,000.00) coverage per occurrence for each
site or project for all damages arising out of bodily injury, personal injury, and property damage.
6. D e d u c t i b l e s  a n d  S e l f - I n s u r e d  R e t e n t i o n s :  A n y  d e d u c t i b l e  o r  self-insured retention must be
declared to and approved by the Town of Granby.  All deductibles or self-insured retentions are the
sole responsibility of the awarded Respondent to pay and/or to indemnify.
7. Errors and Omissions Insurance. The awarded Respondent shall provide and maintain Errors
and Omissions Insurance with minimum limits of $2,000,000 per occurrence/annual
aggregate.  The policy shall not have a deductible greater than $50,000.00.  
The Town of Granby shall be named as “Additional Insured.” Coverage is to be provided on a
primary, noncontributory basis. Waiver of subrogation in favor of the Town of Granby is required
on all applicable policies, including workers’ compensation. If any policy is written on a “Claims
Made” basis, the policy must be continually renewed for a minimum of two (2) years from the
completion date of the Contract. If the policy is replaced and/or the retroactive date is changed,
then the expiring policy must be endorsed to extend the reporting period for claims for the policy
in effect during the Contract for two (2) years from the completion date. 
Defense, Hold Harmless and Indemnification
The successful proposer agrees, to the fullest extent permitted by law, to defend, indemnify, and
hold harmless the Town, its employees, officers, officials, agents, volunteers and independent
contractors, including any of the foregoing sued as individuals (collectively, the “Town
Indemnified Parties”), from and against all proceedings, suits, actions, claims, damages, injuries,
awards, judgments, losses and expenses, including attorney’s fees, arising out of or relating,
directly or indirectly, to the successful proposer’s malfeasance, misconduct, negligence or failure
to meet its obligations under the RFP or the Contract. The successful proposer’s obligations under
this section shall not be limited in any way by any limitation on the amount or type of the successful
proposer’s insurance. Nothing in this section shall obligate the successful proposer to indemnify
the Town Indemnified Parties against liability for damage arising out of bodily injury to persons
or damage to property caused by or resulting from the sole negligence of the Town Indemnified
Parties. In any and all claims against the Town Indemnified Parties made or brought by any
employee of the successful proposer, or anyone directly or indirectly employed or contracted with
by the successful proposer, or anyone for whose acts or omissions the successful proposer is or
may be liable, the successful proposer’s obligations under this section shall not be limited by any
limitation on the amount and type of damages, compensation or benefits payable by the successful
proposer under workers’ compensation acts, disability benefit acts, or other employee benefits acts.
The successful proposer shall also be required to pay any and all attorney’s fees incurred by the
Town Indemnified Parties in enforcing any of the successful proposer’s obligations under this
section, which obligations shall survive the termination or expiration of this RFP and the Contract.
As a municipal agency of the State of Connecticut, the Town will NOT defend, indemnify, or hold
harmless the successful proposer. 
These insurance requirements are not meant to be construed as a limitation of liability. The parties
agree that the amounts of insurance under this Agreement do not, in any way, limit the Respondent’s
liability to the Town of Granby by virtue of this promise to indemnify and hold the Town of Granby

Page 325

Page 6 of 7
harmless so that in the event of any settlement of a claim or a judgment in an amount in excess of
the amount of insurance coverage carried by the awarded Respondent, the Respondent shall be
liable to the Town of Granby for the d i f f e r e n c e ,  p l u s  a l l  f e e s  a n d  e x p e n s e s  i n c u r r e d  i n  c o l l e c t i n g 
same, all at the Respondent’s sole cost.
Freedom of Information
All proposals and any related submittals to the Town are subject to the requirements of the State
of Connecticut Freedom of Information Act, regardless of whether they are marked as confidential,
proprietary, or in any other manner. By the act of submitting a bid, bidders agree that they will be
subject to Connecticut General Statutes Section §1-200 et seq.
Award
The Town intends, but is not required, to make one or more awards as a result of this RFP.
Work Product Ownership
All responses and submittals received as a result of this Request for Proposals shall become the
property of the Town upon receipt. All work products provided to the Town following award shall
also be the sole property of the Town upon receipt.
VI. Questions
All questions regarding this Request for Proposals shall be submitted via email only to Mike
Walsh, Town Manager, MWalsh@Granby-ct.gov. All questions shall be presented by July 6, 2026
to allow for the preparation and distribution of addenda. Responses will be posted on the Town’s
website.
THE TOWN OF GRANBY IS AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION
EMPLOYER.
WBE/MBE/SBE & SECTION 3 DESIGNATED BUSINESSES ARE ENCOURAGED TO
APPLY.

Page 326

Appendix - Cost Proposal Form and BETA Hourly Rates

Page 327

Page 7 of 7
APPENDIX A
Cost Proposal
Name of Engineering Firm: ___________________________________________________
Services Needed
On-Call Engineering and Related Services
Please indicate your firm’s hourly fees over the five-year period of the contract
Billing Category Hourly Billing Rate
Project Manager ________________
Chief Engineer ________________
Engineer ________________
Technician Support ________________
Clerical/Researcher ________________
Other ________________
Other Expenses (if applicable):
Identify any other categories and costs required to provide Engineering and On-Call 
services that are not included above:
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________

Page 328

January 7, 2026
2026 BILLING RATES
2026 HOURLY RATE SCHEDULE
Labor Category Loaded Hourly Rate
Principal in Charge $ 290 - $ 410
Senior Associate $ 275 - $ 305
Lead Professional $ 230 - $ 295
Senior Discipline Professional $ 225 - $ 265
Senior Project Manager $ 195 - $ 275
Senior Resident Observer $ 215 - $ 240
Project Manager $ 175 - $ 230
Resident Observer $ 165 - $ 190
Senior Project Professional $ 140 - $ 205
Project Professional $ 135 - $ 170
Professional $ 110 - $ 160
Staff Professional $ 110 - $ 145
Designer $ 105 - $ 140
Technician $  90 - $ 120
Rates effective through December 31, 2026
Escalation, up to 5%, applied to each year thereafter.
Direct expenses will be billed at 110% of actual cost.

Page 329

Rhode Island
Massachusetts
Connecticut
New Hampshire
www.BETA-Inc.com

Page 330

Proposal for
Professional Engineering Services
GZA GeoEnvironmental, Inc.
1350 Main Street, Suite 1400  
Springfield, MA 01103 
Phone:  413-726-2100 
Fax: 413-732-1249 
GZA.com • 35 Offices Nationwide 
July 24, 2026

Page 331

An Equal Opportunity Employer M/F/V/H 
July 22, 2026 
Mike Walsh, Town Manager 
Town of Granby 
15 North Granby Road 
Granby, CT 06035 
Re:   Request for Proposals  
Professional Engineering Services 
Town of Granby 
15 North Granby Road 
Granby, CT 06035 
Dear Mr. Walsh: 
GZA GeoEnvironmental, Inc. (GZA) is pleased to submit this statement of qualifications to 
support the Town of Granby, Connecticut with on-call engineering services. GZA offers the 
breadth and depth of a multi-disciplinary, employee-owned, consulting firm with experienced 
environmental, geotechnical, ecological, water, and construction management professionals, 
supported by more than 800 staff in 35 offices across the United States, including a local office 
in downtown Springfield. 
In 2025, GZA completed the Granby Recreation Facilities Analysis, which included the 
preparation of a master plan for Salmon Brook Park. In this master plan, GZA worked with the 
Town to propose a coordinated layout of new and relocated park facilities, which included a 
pickleball court and a restroom building. From working on this project, including coordination 
with the Town and public engagement with local residents and other stakeholders, GZA’s team 
of landscape architects and civil engineers gained an understanding of Granby’s open space 
system and recreation facilities, while developing a successful collaborative relationship with 
Town staff.   
In response to the Town’s request for proposals for on-call services, which may include design 
of recreational facilities as well as a park restroom building, we have included the architecture 
firm edmSTUDIO as a subconsultant on our team. GZA and edmSTUDIO recently collaborated 
on the renovation of Walker Grandstand, an historic baseball facility in Forest Park in 
Springfield Massachusetts. 
If selected, GZA’s team will provide the Town with designs for facilities and site improvements 
that are implementable, coordinated with existing site infrastructure and utilities, 
aesthetically integrated into each location, responsive to how the public uses each site, and 
attentive to the maintenance practices and operations of Town staff. Based on the scope of 
projects this project team has performed over the years, we believe our team has the capacity 
and depth of resources to complete your project needs in a timely and responsive manner.  

Page 332

July 22, 2026 
Response to Request for Proposals: Professional Engineering Services 
Town of Granby, CT 
Page | 2 
Proactive by Design
An Equal Opportunity Employer M/F/V/H 
We would welcome the opportunity to discuss this proposal with the RFP review committee.  Should you have any 
questions, please contact the undersigned. 
Very truly yours, 
GZA GEOENVIRONMENTAL, INC.  
Nathaniel Russell, P.E. Anja Duffy, PLA 
Associate Principal Consultant/Reviewer 
nathaniel.russell@gza.com anja.duffy@gza.com
Dan Shaw, PLA 
Project Manager 
daniel.shaw@gza.com

Page 333

DCAMM - ASTM Phase I Environmental Site Assessment and Focused Subsurface Investigation 
DCAMM Project No. ORE2618 
277 Ashland Street, North Adams, MA T O C
Table of Contents
Section 1. Firm Profile
Section 2. Understanding of Services 
Section 3. Qualifications 
Section 4. List of Personnel 
Section 5. References 
Attachment A. Relevant Project Experience  
Attachment B. Resumes 
Attachment C.  Cost Proposal 

Page 334

Town of Granby  
Professional Engineering Services P a g e  | 1
Firm Profile 
GZA GeoEnvironmental, Inc. (GZA) was established in 1964, and over the 
past 62 years, we’ve grown into a nationally recognized, multidisciplinary 
consulting firm with 35 offices across the United States. GZA has 
successfully completed thousands of projects for a diverse range of public 
and private sector clients. Today, we offer a comprehensive suite of services 
designed to address complex challenges across multiple industries, 
including: 
 Environmental Engineering and Environmental Science Services 
 Ecological/Natural and Nature-Based Solutions (NNBS) 
 Planning Services (including urban and land-use/re-use planning) 
 Engineering Services (Environmental, Civil/Site, Geotechnical, 
Structural, GeoStructural, and Waterfront/Marine) 
 Building Services / Due Diligence 
 Landscape Architecture  
 Water Resources / Water Rights 
 Data Management, GIS/Geospatial Analysis and Visualization 
 Construction Management and Oversight 
 Community Education and Engagement 
GZA is an employee-owned firm with over 800 staff members motivated to propel the firm forward, seeking 
integrated, complex, and interesting projects that underscore a commitment to client satisfaction, 
environmental stewardship, and best practices in engineering, science, planning, and construction. GZA has 
earned a reputation for solving site-related challenges in both urban and rural areas, as well as on projects 
with highly complex engineering challenges.  
This integrated service model is directly aligned with the Town of Granby’s need for responsive, 
multidisciplinary support for athletic facility improvements, park infrastructure, utility coordination, 
permitting, and municipal capital projects over the five-year on-call period. 
Section 1.  
LEAD OFFICES 
GZA GeoEnvironmental, Inc. 
1350 Main Street, Suite 1400 
Springfield, MA 01103 
GZA GeoEnvironmental, Inc. 
95 Glastonbury Boulevard, 3rd
Floor 
Glastonbury, CT 06033 
CORPORATE OFFICE 
GZA GeoEnvironmental, Inc. 
249 Vanderbilt Avenue 
Norwood, MA 02062 
GZA is an Employee-Owned, 
for Profit C-Corporation 
Established: 1964-Massachusetts 
PRIMARY CONTACT 
Dan Shaw 
Project Manager 
413-726-2129 
daniel.shaw@gza.com

Page 335

Town of Granby  
Professional Engineering Services P a g e  | 2
Our success is based on our ability to be good listeners, deliver practical and sound planning and 
engineering solutions, while being mindful of the client’s budget and schedule.
CIVIL ENGINEERING 
GZA offers comprehensive engineering and environmental services to support successful project planning, 
design, and implementation. Our team brings deep experience in asset management, condition assessment, 
site planning, evaluation of design alternatives, roadway and utility layout, cost analysis, permitting, and 
construction oversight. We provide services including planning, design, permitting, estimating probable 
construction costs, preparation of bid documents, bidding assistance, construction management, oversight 
and inspection (either full-time or part-time as necessary), and preparation of as-built drawings and 
operation and maintenance plans. 
We integrate environmental constraints and opportunities with client goals to deliver optimized, buildable 
solutions. Our proven track record in navigating complex, multi-agency permitting processes, paired with our 
strength in stakeholder and public outreach, adds significant value. Through close collaboration between our 
engineering and environmental teams, we ensure every design is practical, environmentally responsible, and 
aligned with regulatory requirements. Our focus remains on delivering cost-effective, timely, and sustainable 
outcomes that meet the unique needs of our clients. 
LANDSCAPE ARCHITECTURE 
GZA’s landscape architects specialize in creating vibrant outdoor spaces where people can connect with 
nature and community. We design places for children to play, neighbors to gather, and people to relax and 
recreate. By integrating these opportunities into the built environment, we strive to enhance the health and 
well-being of individuals, communities, and ecosystems.
GZA’s landscape architects collaborate throughout the design process with ecologists, engineers, scientists, 
and permitting specialists, allowing us to provide achievable design solutions on complex sites. By working 
as an interdisciplinary team, we can simultaneously see the big picture and provide the specific details for 
implementation. Relationships are central to landscape architecture at GZA. We develop trusting, lasting 
relationships with our clients through good communication and attention to clients’ needs. We work carefully 
to ensure our clients’ goals are met, while addressing the needs of the community and ecosystem at each 
site. 
Our work includes public parks, schools, sports facilities, ecological restoration sites, outdoor learning 
environments, playgrounds, green infrastructure, trails and boardwalks. We collaborate with architects on 
site plans for schools and multifamily housing developments; with engineers on projects combining 
infrastructure with ecological restoration and public access; and with communities in developing visions for 
healthier neighborhoods. We regularly provide master plans, site designs, illustrative and 3D renderings, 
public engagement, construction documents, and construction phase services. 
ECOLOGICAL PLANNING & PERMITTING 
GZA provides ecological services, from initial assessment of existing conditions to recommendations, through 
design, permitting, and implementation. We conduct these services whether directly for habitat 

Page 336

Town of Granby  
Professional Engineering Services P a g e  | 3
management purposes (including aquatic settings such as tidal and freshwater ponds, and streams) or in 
support of development. 
In today’s highly regulated world, virtually all alterations of the natural environment require some form of 
environmental permitting. As part of this process, GZA will: 
 Evaluate and document existing natural resources 
 Identify the regulated resources and permit processes 
 Assess possible impacts and prepare mitigation and/or restoration recommendations 
 Develop and implement a permit success strategy based on the preferred alternative 
 Design mitigation or restoration as needed 
 Coordinate with regulators to navigate the often-complex permitting process 
 Implement any needed project mitigation and restoration 
GZA’s Ecology group is staffed with scientists and field task managers who have experience in project 
planning, permitting, and construction-related environmental support services. Our ecological project 
approach and management process incorporate innovative solutions designed to minimize the impact on 
natural resources and ensure environmental compliance throughout the construction process. 
ONE COMPANY – ONE TEAM APPROACH 
GZA maintains a strong “one company – one team” approach to staffing. Our personnel and resources are 
shared among different offices where and when they are needed. This enables us to deliver the most 
qualified and experienced team members for each assignment. This “One Company – One Team” philosophy 
provides clients with a broad range of resources and technical expertise.
The collective knowledge of the entire company is available to each client on every project for an 
experience that is uniquely GZA.

Page 337

Town of Granby  
Professional Engineering Services P a g e  | 4
Section 2.  
Understanding of Services 
PROJECT UNDERSTANDING 
GZA understands the Town of Granby (“Town”, “Client”) is seeking on-call engineering services for planning, 
design, and construction of improvements at Town-owned sites including the Middle/ High School Complex 
and Salmon Brook Park. At the schools, the Town is seeking the replacement of an existing athletic running 
track and adjacent baseball and softball fields. At Salmon Brook Park, the Town plans to create a new year-
round park restroom building, new pickleball courts, and to perform maintenance of an existing sewer pump. 
In addition to these projects, the Town may seek to engage the selected on-call engineering firm for other 
tasks related to the Town’s infrastructure and facilities. 
In 2025, GZA completed the Granby Recreation Facilities Analysis, which included the preparation of a master 
plan for Salmon Brook Park. In this master plan, GZA worked with the Town to propose a coordinated layout 
of new and relocated park facilities, which included a pickleball court and a restroom building. During the 
course of public meetings, stakeholder interviews, and discussions with Town staff, GZA gained an 
understanding of this well-used park’s current and future needs. A dedicated pickleball court, away from 
residential neighbors, emerged as a high priority for the park. A year-round restroom building was also 
identified as an important improvement. To accommodate these, the Master Plan proposed re-
configurations of existing athletic fields, as well as extensions of existing site utilities. From our understanding 
of Salmon Brook Park’s existing infrastructure, facilities, and high level of use, we anticipate that the 
engineering services for the design of new facilities may include design for the relocation of existing features.  
Granby’s extensive parks and school athletic facilities represent important public assets that require 
coordinated maintenance, renewal, and infrastructure investment over time. GZA successfully assisted the 
Town with initial planning for coordinated upgrades to many of the Town’s recreational facilities during the 
Granby Recreation Facilities Analysis, and our team would be pleased to continue supporting Granby as the 
Town undertakes the next round of improvements to its recreational facilities and infrastructure.
GZA understands that this contract is structured as a five-year task-order/on-call assignment, with individual 
services to proceed only upon written authorization by the Town. 
TOWN-PROVIDED INFORMATION
GZA anticipates that the Town will provide available information and coordination necessary to support each 
authorized task order, including available record drawings, prior studies and reports, utility information, 
existing maintenance records, available GIS or survey information, and other relevant background 
documentation. GZA also anticipates that the Town will provide reasonable site access, identify appropriate 
Town staff and stakeholder contacts, support coordination with facility users and operations staff as needed, 
and provide timely review comments at key project milestones. 

Page 338

Town of Granby  
Professional Engineering Services P a g e  | 5
At the outset of each assignment, GZA will work with the Town to confirm available information, identify any 
additional data needs, and establish a coordinated approach for advancing the work efficiently. 
PROJECT APPROACH  
If selected, GZA’s team will provide the Town with designs for facilities and site improvements that are 
implementable, coordinated with existing site infrastructure and utilities, aesthetically integrated into each 
location, responsive to how the public uses each site, and attentive to the maintenance practices and 
operations of Town staff. Our design process will benefit from our existing knowledge of Granby’s 
recreational facilities, and will be based on an in-depth review of available information, site visits, existing 
conditions site survey, review of permitting requirements, discussions with Town staff and stakeholders, and 
public input and engagement as needed. Due to proximity to wetland resources in Salmon Brook Park, GZA’s 
ecological consultants will assist the Town in identifying and securing necessary permits for the proposed 
work, if needed. Designs for site improvements will be supported by cost estimates, which we will maintain 
as each project advances.  
For each authorized assignment, GZA will tailor its approach to the specific project type, whether advancing 
athletic facility improvements at the school complex, site and utility design for Salmon Brook Park 
improvements, sewer pump maintenance assessment and administration, or other municipal civil 
engineering tasks requested by the Town. 
Design of the Salmon Brook Park restroom building will be led by edmSTUDIO, who will provide architecture 
services as part of our consulting team. edmSTUDIO’s architecture practice is supported by structural 
engineering services from Macchi Engineers, and mechanical, electrical, and plumbing (MEP) services from 
CES. From edmSTUDIO: 
Designing a successful year-round public restroom requires more than simply meeting program 
requirements. Our approach begins by understanding how the facility will be used throughout the seasons, 
maintenance operations, security concerns, and the character of the surrounding park. We collaborate with 
municipal staff and stakeholders and, when appropriate, facilitate public engagement to ensure the facility 
reflects the needs of both the community and those responsible for its long-term operation. 
Our design focuses on creating durable, low-maintenance facilities that are safe, accessible, and energy 
efficient. We prioritize Crime Prevention through Environmental Design (CPTED) principles, including 
vandalism-resistant materials and fixtures, clear sightlines, and building components that can withstand New 
England's climate and heavy public use. To support year-round operation while minimizing energy costs, we 
design high performance building envelopes with continuous insulation and airtight construction, paired with 
efficient mechanical and lighting systems, incorporate low flow plumbing fixtures, and evaluate opportunities 
for advanced electric systems and solar energy where appropriate. From design through bidding and 
construction, edmSTUDIO remains an active partner, delivering coordinated documents and responsive 
construction administration to help deliver a facility that will serve the community reliably for decades. 

Page 339

Town of Granby  
Professional Engineering Services P a g e  | 6
Section 3.  
Qualifications 
ON-CALL EXPERIENCE 
GZA offers all of our core services out of our Massachusetts and Connecticut offices, allowing us to provide 
comprehensive services the Town may need throughout the on-call period, with a team experienced with 
Connecticut regulations and permitting.  GZA also has the ability to call upon other experts as needed from 
our vast team of professionals in our offices in New England and beyond if specialty needs arise during the 
Project or if additional staffing is needed.   
GZA’s staff, with diverse technical backgrounds, has demonstrated that it has the resources, flexibility and 
technical and project management expertise needed to provide services to complete large and small projects 
– regardless of complexity -- within a broad range of disciplines. With the ability to manage unpredictability, 
remain nimble, and mobilize quickly, our teams can respond to inquiries with urgency, sensitivity, knowledge, 
and value, while remaining mindful of project costs and schedule. As such, GZA has the capacity to handle a 
variety of on-call assignments that the Town may require, including concurrent assignments.   
GZA has decades of experience on projects in Connecticut, Massachusetts and beyond, working with 
government agencies, regional planning commissions, and municipalities, as well as private clients.  
Provided below is a partial listing of some of those cities and towns we have held on-call assignments with. 
While this list is not inclusive of all on-call contracts, it serves to illustrate our project experience with this 
specific type of service. 
Many of these on-call assignments, particularly with state agencies, have been renewed and maintained for 
more than a decade. GZA understands the demands of managing multiple concurrent assignments, 
responding to urgent infrastructure needs, and maintaining continuity, responsiveness, and cost control 
across long-term municipal and agency contracts.
 Trinity College 
 CT Department of Transportation 
 CT Department of Energy and Environmental 
Protection 
 Connecticut Department of Administrative 
Services 
 University of Connecticut 
 City of New Britain, CT 
 UMass Amherst 
 MA Department of Conservation and 
Recreation 
 Massport 
 MA Division of Ecological Restoration 
 MA Dept. of Capital Asset Management & 
Maintenance 
 Massachusetts Water Resources Authority 
 Boston Water and Sewer Commission 
 City of Springfield, MA 
 City of Chicopee, MA 
 City of Northampton, MA 
 City of Westfield, MA 
 City of Newton, MA 
 City of Salem, MA 
 City of Somerville, MA 
 City of Boston, MA 
 City of Andover, MA 

Page 340

Town of Granby  
Professional Engineering Services P a g e  | 7
 City of Cambridge, MA 
 City of Quincy, MA 
 Town of Agawam, MA 
 Town of Barnstable, MA 
 Town of Cohasset, MA 
 Town of Cotuit, MA 
 Town of Dennis, MA 
 Town of Devens, MA 
 Town of Dighton, MA 
 Town of East Longmeadow, MA 
 Town of Framingham, MA 
 Town of Granby, MA 
 Town of Medford, MA 
 Town of Nantucket, MA 
 Town of Natick, MA 
 Town of Raynham, MA 
 Town of Seekonk, MA 
 Town of Shrewsbury, MA 
 Town of Wrentham, MA 
 Town of Yarmouth, MA 
 Town of Wethersfield, MA 
 Town of Brockton, MA Area Transit Authority 
 The Hotchkiss School 
 Greenwich Hospital 
 The Loomis Chaffee School 
CAPACITY AND RESPONSIVENESS
GZA has the staffing depth, multidisciplinary technical resources, and established subconsultant relationships 
necessary to support the Town’s five-year task-order/on-call assignment. Our proposed team includes 
Connecticut-licensed professional engineers, landscape architects, ecological and permitting specialists, 
construction phase support staff, and dedicated QA/QC reviewers who can be assigned based on the scope, 
complexity, and schedule of each authorized task order. This staffing structure allows GZA to respond quickly 
to routine municipal requests while also providing specialized technical support for more complex 
assignments.
GZA’s project manager will serve as the Town’s primary point of contact and will coordinate staffing, budgets, 
deliverables, and communications for each assignment. For concurrent task orders, GZA will assign 
appropriate discipline leads and supporting staff, track progress against agreed-upon schedules, and 
maintain regular coordination with the Town to confirm priorities, review milestones, and address schedule 
or budget considerations early. This approach provides clear accountability and allows individual assignments 
to advance efficiently without losing sight of the overall on-call program. 
GZA will also coordinate directly with our subconsultants, including architectural, structural, MEP, and survey 
partners, to integrate their work into each task order as needed. We will establish project-specific scopes, 
schedules, and deliverable responsibilities at the outset of each assignment, then manage internal and 
subconsultant reviews to support timely, coordinated, and complete submissions to the Town. 
SUBCONSULTANTS 
While GZA can offer the majority of the core and specialized services requested in the RFP, we have included 
specialized subconsultants in our proposed team to supplement and support our work. Our proposed team 
also includes subconsultants edmSTUDIO (architectural services), CES (MEP services), Macchi Engineers, LLC 
(structural engineering), and Heritage Land Surveying & Engineering, Inc. (land surveying). 
RELEVANT PROJECT EXPERIENCE 
Generalized narratives and firm/service area profiles for GZA, edmSTUDIO, CES, Macchi Engineers, and 
Heritage Land Surveying and Engineering, Inc., along with project descriptions of applicable projects within 
the last five years, are included in Attachment A.

Page 341

Town of Granby  
Professional Engineering Services P a g e  | 8
Section 4.  
List of Personnel 
Key to providing successful professional services is the quality and experience of the 
team of personnel proposed to work for the Town.  GZA considers the caliber of our 
team members to be our number one qualification.   
PROPOSED GZA PROJECT TEAM 
The following professionals are included as the key members of GZA’s project team for this on-call 
assignment. These staff have significant experience working together on projects for municipalities, including 
the types of projects that GZA expects to perform under this on-call contract. Resumes are located in 
Attachment B. Corresponding hourly rates for each project team member are included in the attached cost 
proposal.
NATHANIEL L. RUSSELL, PE | PRINCIPAL | GEOTECHNICAL/CIVIL ENGINEER  
(Associate Principal Engineer rate)
Mr. Russell, P.E. is GZA’s proposed Principal-in-Charge for all assignments under this on-
call.  Mr. Russell is currently the geotechnical and civil engineering lead for the Springfield 
office and a Connecticut Professional Engineer.  As a GZA Vice President and GZA 
Principal, Mr. Russell regularly interfaces with all of the service areas that GZA offers.  He 
will be a key player in GZA’s continuing responsiveness to the needs of our clients,  
matching company personnel and practice areas to the tasks at hand and marshalling 
response teams to address client requirements.   
Mr. Russell is a civil and geotechnical engineer who serves as an Associate Principal for 
GZA with over 22 years of experience, including the past 12 years at GZA’s Springfield 
office. His experience includes geotechnical engineering and design, parks and dams, site 
investigations, landfill design and permitting, stormwater and erosion and sediment 
control design and permitting, wetland permitting, environmental remediation and 
brownfields redevelopment, alternative energy site development, project management, 
construction management and construction quality assurance, and litigation support. He 
has extensive experience in both design and construction, with broad exposure to all 
aspects of civil engineering.

Page 342

Town of Granby  
Professional Engineering Services P a g e  | 9
DANIEL SHAW, PLA | LANDSCAPE ARCHITECT
(Project Landscape Architect rate) 
Mr. Shaw will be the Project Manager / Lead Landscape Architect and will serve as the 
primary contact for the Town regarding the technical work and financial management 
for the on-call contract. He will work with the Town’s project team to schedule project-
related meetings and manage the preparation of deliverables. Mr. Shaw is a registered 
Landscape Architect who has created landscape designs for a range of clients, including 
municipalities, architects, and state agencies. His background has given him broad 
knowledge in designing public spaces, parks, trails, playgrounds, and athletic facilities. 
STEVEN D’AMBROSIO, P.E. | CIVIL ENGINEER  
(Project Engineer rate) 
Mr. D’Ambrosio is a site civil professional engineer with over 23 years of experience. His 
experience includes site civil design and permitting for development of residential, 
commercial, and municipal properties and golf courses, sanitary sewer system design, 
hydrologic and hydraulic modeling, stormwater system design, utility coordination, 
roadway layout and design, and the design and permitting for freshwater dredging, plus 
other water resources and parks projects.  Mr. D’Ambrosio is well versed at site civil 
design elements, including utility coordination, design development of drawings and 
specifications, cost estimate development, pre-bid consultation and addenda 
preparation, review of bids and construction administration, including onsite inspections 
and punch list development, etc.  He is experienced at working with contractors on large-
scale assignments and often leads teams on large assignments.   
ANJA RYAN DUFFY, PLA, WEDG | CONSULTANT REVIEWER| LANDSCAPE ARCHITECT  
(Senior Landscape Architect rate) 
Ms. Duffy has 19 years of professional experience and will be responsible for in-house 
Quality Control / Quality Assurance for the on-call assignment as the assigned in-house 
Consultant / Reviewer (C/R). The C/R is competent in the appropriate disciplines and is 
independent from the day-to-day operation of the project. The C/R concentrates on the 
technical approach, correctness, and loss prevention, and plays a major role in 
controlling the quality of services by reviewing major concepts, approaches, conclusions, 
and recommendations before they are transmitted to the client. Ms. Duffy’s experience 
includes site development projects, including landscape/site design for park 
redevelopment projects, site civil work, and master planning work for recreational 
facilities. Her work includes preparing master plans, grant application support, bid phase 
support, construction phase services, and on-site construction monitoring activities.
MARK STADNICKI, P.E. | CIVIL ENGINEER  
(Project Engineer rate)
Mr. Stadnicki is a Professional Engineer with experience in various aspects of civil 
engineering site development, including layout, grading, utility coordination, drainage 
design, and construction support. He has worked on numerous site civil developments 
performing tasks such as review of local by-laws, evaluation, planning, layout, grading, 
utility and drainage design, preparation of engineer’s opinions of probable construction 
cost, construction specification writing, contractor submittal review, and construction 
observation.

Page 343

Town of Granby  
Professional Engineering Services P a g e  | 10
ROBIN CASIOPPO, PWS, PSS, CESSWI | ECOLOGICAL SERVICES  
(Senior Wetland Scientist rate) 
Ms. Casioppo is a Project Manager with experience in ecological assessments and 
environmental permitting. Ms. Casioppo is a field biologist who specializes in botany, 
wildlife, wetland ecology, and soil science.  She is responsible for conducting botanical 
surveys, rare species surveys and monitoring (including reptiles and amphibians, birds, 
lepidoptera, and plants), habitat mitigation design, vernal pool assessments, wetland 
delineations, and natural resources inventories. Ms. Casioppo is a Professional Wetland 
Scientist and has performed numerous wetland delineations throughout New England 
and has supported permitting efforts consisting of federal (USACE Section 404), State 
(MA and CT 401 WQC, MA WPA, CT IWWA, RI FWA), and local permits. She has also 
performed numerous wetland delineation and permitting peer review services for 
various town Conservation Commissions. 
STEPHEN LECCO, CEP, AICP, PWS | PERMITTING  
(Associate Principal Scientist rate) 
Mr. Lecco is a Senior Environmental Planner with more than 30 years of experience in 
planning, permitting and environmental analysis for waterfront, water resources, 
airport, highway, utility, dam, site development, recreation, ecological restoration, 
energy facility and site remediation projects.  He has been the CEPA/MEPA/NEPA lead 
for numerous projects in New England and beyond.  His broad knowledge of many 
technical elements allows him to successfully manage large-scale interdisciplinary and 
complex projects that are required to comply with CEPA/NEPA, Section 404/401 Clean 
Water Act, Coastal Zone Management, National Historic Preservation Act, Endangered 
Species Act, Magnuson-Stevens Act and other federal, state and local laws, regulations 
and policies. 
JEFFREY TAYLOR | LANDSCAPE DESIGNER  
(Assistant Landscape Designer rate) 
Jeffrey Taylor supports CAD drawing production and construction document preparation 
for site, landscape, and park improvement projects. His work focuses on developing 
clear, coordinated, and legible drawings that communicate design intent, support 
interdisciplinary review, and provide the level of detail needed for construction bidding. 
His attention to drafting standards, graphic clarity, and deliverable organization helps 
produce bid-ready documents that contractors can interpret and use effectively during 
pricing and construction.

Page 344

Town of Granby  
Professional Engineering Services P a g e  | 11
GZA GeoEnvironmental, Inc. (GZA) has provided park improvement services to municipalities in the region 
for over 25 years. We have extensive experience with urban and rural parks, including master planning, public 
outreach, cost estimating, preparation of construction documents, and construction phase services. GZA has 
assisted municipalities in preparing and furthering master plan-level designs into construction documents, 
administering public bids, and serving as engineer-of-record for numerous publicly funded projects. The 
following references can attest to GZA’s on-call engineering and landscape architecture services.
REFERENCES 
The following three references are from similar municipal park, recreation, and site improvement projects:
1. PROJECT: 25 SCHOOL PLAYGROUNDS 
Description: GZA provided site civil engineering and landscape architecture services for the 
development of twenty-five new school playgrounds throughout Springfield at various elementary 
schools. GZA provided full design, cost estimation, preparation of construction documents, bid phase 
services, and construction phase services. Each site was publicly bid individually, with bids awarded 
to a variety of contractors. Construction on all 25 sites is currently nearing completion. The project 
was funded with Early and Secondary School Emergency Relief III funding.
Location: Springfield, MA  
Completion Date:  Fall 2024 
Contact: John Carignan, Director of School and Municipal Buildings     
Phone: (413) 787-6279 
Owner: Facilities Management Division, City of Springfield 
Address: 233 Allen St, Springfield, MA 01108
Email: jcarignan@springfieldcityhall.com
Section 5.  
References

Page 345

Town of Granby  
Professional Engineering Services P a g e  | 12
2. PROJECT: POMERANCE AND TUCHMAN MASTER PLAN 
Description: GZA prepared a master plan for a 100-acre municipal park in Greenwich, CT, focused on 
ecological management, historic preservation, and passive recreation. Recommendations were 
organized by priority level and approximate estimated cost. The master plan also identified potential 
funding sources and outlined installation and maintenance considerations for proposed 
improvements. The project included public meetings and an online survey prepared by GZA that 
drew more than 700 responses.
Location: Greenwich, CT 
Completion Date:  Spring 2024 
Contact: Dr. Gregory Kramer, Superintendent of Parks and Tree Warden 
Owner & Address:   Town of Greenwich, 101 Field Point Road, Greenwich, CT 06830
Phone: (203) 622-7824 
Email: gregory.kramer@greenwichct.org
3. PROJECT: REDEVELOPMENT OF GREENLEAF PARK 
Description: GZA provided master planning services for the redevelopment of Greenleaf Park and 
assisted with grant application services. Upon receipt of $2.5M in funding from multiple sources, the 
City of Springfield contracted GZA to provide site civil engineering, landscape architecture, and 
ecological permitting services for the redevelopment of Greenleaf Park. Site improvements included 
a new accessible splash pad, two new accessible playgrounds with poured-in-place rubber safety 
surfacing, a redeveloped parking lot, culvert headwall reconstruction, and an extensive accessible 
walking trail system featuring a new pedestrian bridge. The project was completed in June 2024.
Location: Springfield, MA 
Completion Date:   June 2024 
Contact: Laura Walsh, Senior Parks Planner   
Owner & Address:   Dept. of Parks, Buildings, and Recreation Management 
200 Trafton Road, Springfield, MA 01108
Phone: (413) 886-5186
Email: lwalsh@springfieldcityhall.com

Page 346

 
Proposal for Professional Engineering Services 
Town of Granby 
 
    
 
   
 
 
SECTION 1 Response Cover Sheet  
07 COMPANY PROPOSAL 
ATTACHMENT 
A 
Relevant Project 
Experience  

Page 347

P R O F I L E 
GZA- Who We Are 
Every day, GZA’s experts build on a legacy of trust through their 
personal commitment to excellence.
Don Goldberg and Bill Zoino founded GZA in 1964 on the values of integrity, professionalism,  
and loyalty. Since then, the company has grown from a small consulting partnership to a major 
multi-disciplinary, employee -owned firm that focuses on environmental, geotechnical, 
ecological, water, and construction management services. With a staff of more than 800 people 
in 35 offices across the United States, we have completed over thousands of projects for a wide 
array of public and private clients for the past 62 years and counting. 
Because GZA experts are trained across disciplines, clients benefit from the knowledge and 
experience of all our staff and in-house resources who are available for every project at any time. 
With the ability to manage unpredictability, remain nimble, and mobilize quickly, GZA responds 
to client inquiries with urgency, sensitivity, knowledge and value, while remaining mindful of 
project costs and schedule. 
There is a free flow of information and support amongst our employees and offices, enabling us 
to provide every client with access to our extensive knowledge and experience base regardless 
of project location.  Quite simply, the collective knowledge of the entire company is available to 
each client on every project for an experience that is uniquely GZA. 
Clients trust GZA  because of our  honesty, commitment to excellence , and ability to  deliver 
expert solutions that help them succeed. T hey know that GZA helps reduce their project risks 
and strives to maximize results and value through comprehensive analysis each step of the way, 
regardless of the size or complexity  of a project.  It is why we are known for excellence, built 
on trust. 

Page 348

GZA GeoEnvironmental, Inc. Page  |  1
Walker Grandstand 
Springfield, MA 
Working as a subconsultant to architecture firm edmSTUDIO, GZA provided site design 
services for the renovation of the Walker Memorial Grandstand in Springfield’s Forest 
Park. The overall project included much needed structural improvements to the 
century-old building, as well as code compliance upgrades, restroom renovations, 
masonry repointing and reconstruction, site drainage improvements, and accessibility 
upgrades.  
The site improvements designed by GZA included upgrades to the dugouts to meet 
ADA requirements, site drainage improvements, and accessible walkways. By 
designing new accessible sloping paved walkways to the dugouts, GZA was able to 
preserve the historic structures while making them accessible. Stormwater on the site 
was managed with a system of area drains connected to new subsurface infiltration 
chambers. GZA provided design through construction phase services for the site 
improvements, working alongside an interdisciplinary team of consultants that 
included architects, surveyors, structural engineers, and MEP engineers. The project 
was completed in 2025.  
This successful project has extended the lifespan of the historic grandstand, allowing it 
to serve the Springfield community into the future. The project’s important 
accessibility upgrades have allowed the renovated grandstand to now be enjoyed by a 
much broader range of visitors. 
Project Highlights 
 Accessibility Upgrades 
 Drainage Upgrades 
 Landscape Architecture 
 Civil Engineering 
 Coordination with Architecture 
 Construction Phase Services 
GZA provided site design within a team led by edmSTUDIO for upgrades to the historic grandstand.
Accessible ramps and walkways were added to the
grandstand.

Page 349

GZA GeoEnvironmental, Inc. Page  |  1
Challenge: The Town of Granby’s largest park was highly programmed and 
experiences high levels of visitorship, while the second largest park was underutilized. 
The Town needed a coordinated pair of master plans identifying best usage of these 
two public spaces, based on an understanding of the community’s current use and 
future goals for these parks. 
Solution:  GZA provided services for site analysis, public engagement, and master 
planning for the two largest municipal parks in the Town of Granby. Through a review 
of GIS data, site plans, site visits, and interviews with Town staff and community 
stakeholders, GZA developed an understanding of the many programmatic uses of 
these two large parks, as well as existing infrastructure and site opportunities and 
constraints, and developed a pair of interrelated master plans which outlined a cohe-
sive vision for coordinated prioritized improvements across the two parks. 
Recommendations included reconfiguration of select site elements for better usage of 
space, proposed upgrades to sports fields, accessibility improvements, hiking trails, 
playgrounds, and other park amenities. The master plans were accompanied by a 
summary memorandum describing steps for implementation and estimated ranges of 
costs for proposed improvements. 
Benefit: GZA’s master plan has enabled the Town to prioritize use of available 
resources, and implement site improvements as the opportunities arise, building 
towards a cohesive vision for Granby’s parks system.
Recreation Facility Analysis
Granby, CT 
Project Highlights 
 Community Engagement 
 Stakeholder Interviews 
 Site Analysis 
 Master Planning 
 Landscape Architectural Design 
Client Contact: 
Sandy Yost, Director of Human Services
Town of Granby 
15 North Granby Road 
Granby, CT 06035 
860-844-5351 
syost@granby-ct.gov 
GZA prepared master plans illustrating coordinated, prioritized site improvements across Granby’s two largest parks.

Page 350

GZA GeoEnvironmental, Inc. Page  |  1
Greenleaf Park is 46-acre public park located in Springfield, MA and hosts an 
assortment of playing fields, tennis, and basketball courts, parking lots, wooded areas 
and wetland resources.   
Challenge: The City of Springfield came to GZA to develop design drawings for new 
pickleball courts and a tennis court in the location of three existing tennis courts in 
poor condition.   
Solution: GZA’s landscape architects developed design alternatives that showed 
pickleball courts and a tennis court in multiple orientations to determine the best fit 
for the location. Ultimately, GZA landed on a layout with six (6) regulation pickleball 
courts, separated down the center by a 4-foot-tall chain link fence and one (1) 
regulation tennis court, separated by a 10-foot-tall chain link fence to keep balls from 
interfering. GZA provided bid phase and construction phase designer services, and 
the project was completed on time and within budget.  
Benefit: The City has benefited from these newly constructed pickleball and tennis 
courts, providing residents and users a free and accessible venue to recreate at in 
Springfield.
Redevelopment of Tennis and Pickleball Courts at 
Greenleaf Park 
Springfield, MA 
Project Highlights 
 Cost Estimation  
 Landscape Architecture 
 Civil Engineering  
 Construction Phase Services 
Users enjoying the newly constructed pickleball courts
with the tennis court located in the background.
Mayor Domenic Sarno speaking at the ribbon cutting
ceremony.
Newly installed 10-foot-tall chain link fencing
surrounding the new courts.
Mayor Domenic Sarno and Department of Parks,
Buildings, and Recreation Management Director 
Thomas Ashe playing a game of pickleball at the 
ribbon cutting ceremony.

Page 351

GZA GeoEnvironmental, Inc. Page  |  1
The City of Springfield wished to enhance recreational opportunities, achieve universal 
accessibility, and implement climate-resilient design within the 166± acre Blunt Park, 
which hosts the popular Stone Soul Festival held annually on Labor Day weekend.    
Challenge: The City needed a site design that could be included in state and federal 
grant applications to fund implementation. The design would need to be constructed 
in phases and would need to meet Parkland Acquisition and Renovations for 
Communities (PARC) grant funding requirements. 
Solution:  GZA prepared a master plan for the multi-phase redevelopment of Blunt 
Park, identified a feasible Phase I of development, and assisted with the grant 
application for funding. Upon the City’s receipt of $1.5M of funding from State and 
Federal sources, the City of Springfield hired GZA to provide landscape architecture, 
civil engineering, and wetlands permitting services for the project. GZA services 
included preparation of construction documents, permitting, and construction phase 
services. Phase I project improvements included improved ADA-compliant walkways, 
accessible playground featuring poured-in-place surfacing and engineered wood fiber 
safety surfacing, renovated pavilion, enhanced picnic grove, memorial/seating area, 
water play splash pad, six fully reconstructed tennis courts, upgraded utilities, 
improved site drainage and nature-based stormwater management, and resilient 
landscaping.  
Benefit: GZA’s full developed redevelopment project was completed on time and on 
budget.  To enable a smooth construction phase process, GZA performed weekly site 
inspections and participated on-site job meetings to ensure that the project was 
completed in compliance with project documents and grant requirements. In the end 
the completed project exceeded the community’s expectations. 
Redevelopment of Blunt Park
Springfield, MA 
Project Highlights 
 Conceptual Master Planning 
 Cost Estimation  
 Grant Funding Application 
Assistance 
 Landscape Architecture 
 Civil Engineering  
 Permitting 
 Construction Phase Services 
Carefully designed ADA-accessible playground amidst existing oak grove
New accessible playground
Fully reconstructed tennis courts
New seating/memorial plaza

Page 352

© GZA GeoEnvironmental, Inc. Page  |  1
GZA provided a diverse range of consulting services in support to the PGA TOUR’s redevelopment of the TPC River Highlands Golf 
Course, a PGA Tour Championship level golf course, and subsequently its club house.  The two projects were undertaken by the PGA 
to enhance the aesthetics and playability of the golf course and repair or replace aging infrastructure that had reached the end of its 
service life.  The club house development project involves a full demolition of the existing club, and reconstruction of a much larger 
one.  GZA served as the civil engineering and landscape architectural firm for the new club house’s site development.   
GZA’s services included civil and geotechnical engineering, wetland, environmental and stormwater permitting, landscape 
architecture, presentation at public meetings and construction phase support, including permit-required E&S control inspection and 
documentation.  
TPC River Highlands Golf Course Rehabilitation
and Club House Redevelopment  Cromwell, CT
Project Highlights 
 Civil Engineering Design and 
Permitting 
 Natural Resources Assessment and 
Permitting 
 Site Plan Approval Assistance 
 Stormwater Pollution Control Plan 
(SWPCP) Preparation and 
Certification 
 Construction Phase Erosion and 
Sediment Control Inspections.  
 Landscape Architecture 
TPC River Highlands Golf Course
Site Plan of new club house and its surrounding site. Site features include
parking lot, golf cart storage, maintenance area, outside dining patio, 
walkways, retaining walls, native planting design, stairways, and 
underground stormwater infiltration system. 
GZA worked with the PGA, their architect, and their Contractor to
design and permit the course redevelopment and club house project
on accelerated timelines allowing the PGA to meet their required
construction schedule (ability to initiate construction in Fall with
completion in the spring of, allowing for uninterrupted the annual
Traveler’s Championship Tournament.  GZA successfully permitted
the project with USACE, CT DEEP, and the Town of Cromwell
(IWWA and Planning and Zoning) and provided stormwater
compliance services as required under the CT Construction General
permit.
GZA then prepared and secured approval from CT DEEP of a
Stormwater Pollution Control Plan (SWPCP) in accordance with the
Connecticut General Permit and consistent with the Connecticut
Guidelines for Soil Erosion and Sediment Control and the
Connecticut Stormwater Quality Manual.   
The site development surrounding the new club house is due to
begin in the Fall of 2018, with completion in Spring 2019.  It involves
low impact stormwater design, native planting design, ADA-
compliant access routes, and reconfigured parking and drop-off
areas.  

Page 353

 
© 2016 GZA GeoEnvironmental, Inc.   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Site Development –  
Springfield Senior Center at Blunt Park 
Springfield, MA 
Project Highlights  
 Sanitary Sewer, Water, Gas, and 
Electric Utility extensions from Roo-
sevelt Avenue to the remote, 
undeveloped site requiring design 
review and approvals by the Spring-
field Water & Sewer Commission 
and the City of Springfield’s DPW. 
 Stormwater management designs 
treat stormwater in-place via infil-
tration basins designed to store and 
infiltrate up to and including the 
NRCS 100-yr, 24-hour storm event. 
 Comprehensive Site Civil and Land-
scaping construction drawings and 
specifications and designer services 
during construction.  
GZA provided civil professional civil engineering and landscape architectural ser-
vices for site design, and construction document preparation for a new City of 
Springfield Senior Center located off of Roosevelt Avenue in the City of Springfield, 
Massachusetts.  The Springfield Senior Center project includes the construction of 
a new 28,000 SF, two-story building, designed by Timothy Murphy Architects, and 
associated land development on an undeveloped, wooded 4.9-acre parcel  within a 
portion of the City of Springfield’s Blunt Park.  
 
GZA’s site civil / landscape architectural services included the design of paved ac-
cess drives, 104-car parking facilities, stormwater management infiltration basins, 
pedestrian plazas, and landscaping.  GZA also provided design of utility extensions 
from Roosevelt Avenue to the remote site, including extensive coordination with 
Eversource electrical utility, various communications providers including the City of 
Springfield’s fiberoptics network, the City of Springfield’s Department of Public 
Works, and the Springfield Water & Sewer Commission. 
 
 
The project is located within the City’s Blunt Park.  Since the City had historically utilized Land and Water Conservation Fund grants 
to fund parkland improvements, use of the park to site a new Senior Center required approval from the National Park Service.  GZA 
provided the required documentation for this intensive review process, including the preparation of an Environmental Assessment 
under the National Environmental Policy Act, leading to a Finding of No Significant Impact (FONSI). 
 
 

Page 354

 
 
GZA GeoEnvironmental, Inc.  Page  |  1 
 
 
GZA served the City of Springfield when the Elias Brooking Elementary School was severely damaged by a June 2011 tornado.  
The City needed to erect temporary classrooms in the athletic fields at the school in order to ensure that classes would be open 
on-time in the Fall.  GZA was able to meet the hyper-accelerated schedule, rapidly determine an appropriate exploration 
program and mobilize a drilling subcontractor to complete test borings on short notice.  GZA’s geotechnical work was on the 
critical path to successful project completion, and we were able to prepare a Report within the necessary timeframe, presenting 
our geotechnical recommendations for design and construction of the foundations for the temporary classrooms and temporary 
parking areas. 
After the City determined that it would be more cost effective to build a new school nearby rather than to repair the old school, 
GZA again provided geotechnical consulting services for the new building site.  We designed and performed a subsurface 
investigation to address building foundations, retaining walls, parking areas and stormwater management.  GZA helped the 
City address the widespread presence of unprepared fill and old foundation remnants at the site by preparing plans and 
specifications that allowed the City’s contractor to prepare the building pad site during the main thrust of design and bidding.  
Early site pad preparation was the key to the City being able to meet another aggressive timetable for construction. 
GZA provided full site civil and landscape design services including preparation of construction documents and specifications 
for the $27.5 million state-of-art-building’s site and grounds.  The site features a large parking area, playground, ballfield, 
retaining walls, gathering areas, walkways, paved play area, and ass0cciated landscaping.  Stormwater management design 
includes a combination of gray and green infrastructure, including a rain garden and swale for infiltration of stormwater runoff.  
The building and site were opened to the public in March 2015. 
 
 
Elias Brookings School  
Springfield, MA  
Project Highlights  
• Geotechnical Investigations, 
Recommendations, and 
Specifications 
• Phase I Environmental Site 
Assessment 
• Phase II Environmental Site 
Assessment 
• Site Civil Design Drawings and 
Specifications 
• Site Landscape Design Drawings 
and Specifications 
• Green Infrastructure Stormwater 
Management  
• Construction-Phase Design 
Services 
 
  
 

Page 355

 
 
©GZA GeoEnvironmental, Inc.  Page  |  1 
Development of Camp STAR Angelina 
Site Civil and Landscape Architecture  
Design and Permitting  
Springfield, MA  
Project Highlights  
 Master Plan of Development  
 Phase I Environmental Site Assessment  
 Geotechnical Investigation, Recommen-
dations, and Design 
 Site Civil Engineering for Phase I of De-
velopment 
 Low-Impact Development (LID) Storm-
water Management 
 Design of Outdoor Amphitheater 
 Landscape Architectural Design for Phase 
I of Development 
 Wetlands Delineation, Assessment, and 
Permitting 
 Utilities Design for Full Implementation of 
the Master Plan  
 
  
 
GZA provided site civil engineering and landscape architectural services for the 
first phase of development which included the new swimming pool, bathhouse, 
and camp infrastructure at the City of Springfield’s Camp STAR Angelina.  The 
swimming pool includes a zero-entry interface for full accessibility along with 
multiple waterspray play features interspersed throughout the shallow end.  Site 
development elements include multiple rain gardens and other low impact devel-
opment practices, water distribution systems for fire protection and domestic 
supply, sanitary sewage collection and pumping station, new electrical infrastruc-
ture for the camp, site lighting, and communications.  In addition to the rain 
gardens, landscape elements include accessible parking and walkways, outdoor 
seating, picnic grove, and grass pavers for intermittent vehicular access to the 
bathhouse.   The outdoor amphitheater includes a centrally-located fire pit and 
performance stage, with accessible routes to every seat. 
 
 The $1.8M project was funded by the Commonwealth of Massachusetts 
through the state’s Signature Urban Parks Program, numerous communi-
ty businesses, parents and friends of Camp STAR Angelina, and the 
Springfield Council for Cultural and Community Affairs.  Camp STAR 
Angelina offers inclusive recreational programs for youth and young 
adults (ages 3-22) with and without disabilities. 
 
Phase I of the Master Plan was constructed 2014-2015 and became 
operational in August 2015.  Funding for Phase II, including the Camp 
Lodge, is currently being secured. 
 
 
Facility Signage designed by GZA 
 
Zero entry pool with waterspray elements allows 
wheelchairs to enter directly into the water 

Page 356

 
GZA GeoEnvironmental, Inc.  Page  |  2 
 
 
 
Development of Camp STAR Angelina 
Site Civil and Landscape Architecture  
Design and Permitting  
Everett, MA  
GZA’s site design featured the use of Low-Impact Development (LID) 
stormwater management techniques.  LID is a comprehensive land 
planning and engineering design approach with the goal of maintaining 
and enhancing the pre-development hydrologic regime of developing 
watersheds. LID works with nature to manage stormwater as close to 
its source as possible, and employs principles such as preserving and 
recreating natural landscape features, minimizing effective impervi-
ousness to create functional and appealing site drainage that treats 
stormwater as a resource rather than a waste product. Practices used 
by GZA at Camp STAR Angelina include bioretention facilities, rain 
gardens, grassed swales, and permeable pavements. By implementing 
LID principles and practices, stormwater at Camp STAR Angelina is 
managed in a way that reduces the impact of the re-developed areas 
and promotes the natural movement of water within the Forest Park 
ecosystem and the watershed to nearby Porter Lake.  
 
 
 
 Phase I Site Design Plan by GZA 
Rain Garden at Camp STAR Angelina 
 
Bioretention Area / Rain Garden 
 
 

Page 357

GZA GeoEnvironmental, Inc. Page  |  1
Since 2010 GZA has held an on-call contract with the City of Springfield for 
professional civil engineering, landscape architecture, geotechnical, and ecological 
permitting services.   In that time, we’ve produced conceptual master plans and cost 
estimates for park development and redevelopment projects leading to millions of 
dollars in grant funding which in term led to over 100 successful construction projects.
GZA praises the City of Springfield’s Department of Parks, Buildings, and Recreation 
Management for its stewardship of hundreds of acres of City-owned parkland.  Our 
team of engineers, landscape architects, and scientists are honored to have worked 
with the City on projects including the construction of athletic fields, playgrounds, 
downtown pedestrian plazas, and trails, as well as creating educational landscapes, 
natural open space areas, and habitat restorations.    
Projects for which GZA takes great pride in for which we provided full design, 
construction document preparation, bid phase services and construction phase 
services for include playgrounds, picnic grounds, athletic fields, accessible nature 
trails, accessible paved multi-use paths, lakes and riverfront access, kayak launches, 
splash pads, paved sport courts, and fitness courses.  
We understand sustainability is intrinsic to the caretaking of open spaces and parks.
By implementing sustainable design solutions with land management practices, the 
City of Springfield has been successful in protecting and enhancing the delicate web 
of nature that supports the places where we can connect with nature and each other.
On-Call Professional Engineering and Design for 
Parks Department 
Springfield, MA  
Project Highlights 
 Site Master Planning Services for 
Park Improvement Projects 
 Cost Estimation  
 Landscape Architecture & 
 Civil Engineering  
 Construction Documents 
 Permitting 
 Bid Phase Services 
 Construction Phase Services 
Newly installed accessible walking trail to Porter Lake in Forest Park.
Clifford A. Phaneuf Environmental Center at Forest
Park
Alden Street Park.
Gunnery Sgt. Thomas J. Sullivan Park.

Page 358

GZA GeoEnvironmental, Inc. Page  |  1
As subsequent implementation work, GZA’s multidisciplinary 
team completed a structural and building code compliance 
review of the existing boardwalk and prepared a summary report 
identifying its condition and practical steps to support its 
continued use as a public park amenity. GZA also surveyed 
surrounding vegetation, mapped areas dominated by invasive 
groundcovers, vines, shrubs, and trees, and prepared a 
vegetation management plan and planting plan to remove 
invasive species, reintroduce shade-tolerant native plants, 
improve ecological function, and enhance the historic landscape.
Benefit: The master plan provided the Town with a prioritized 
framework for long-term stewardship of Pomerance and 
Tuchman Park, addressing trail erosion, invasive species 
management, climate resilience, historic preservation, signage, 
and wayfinding. Recommendations were organized by priority 
and approximate cost, with potential funding sources and 
installation and maintenance considerations. The subsequent 
boardwalk evaluation and landscape design advanced the plan 
into targeted implementation, providing practical, phased 
recommendations to preserve historic resources, improve visitor 
safety and experience, restore native biodiversity, and maintain 
this well-loved woodland park as a resilient public amenity. 
Pomerance and Tuchman Park Master Plan, Structural Evaluation of 
Boardwalk and Landscape Design 
Greenwich, CT 
Project Highlights 
 Park Master Planning 
 Community Engagement 
 Ecological Management 
 Historic Preservation 
 Passive Recreation 
 GIS Mapping and Analysis 
The Pomerance and Tuchman parcels contain
existing hiking trails through a variety of 
environments, including Cos Cob pond and its 
dam (pictured above). 
GZA’s structural engineers reviewed the existing
boardwalk for structural and building code 
compliance.
Challenge: The site was the former estate of Ernest Thompson 
Seton, who helped establish the Boy Scouts of America, and 
later the home of Pulitzer Prize-winning author Barbara 
Tuchman. Remnants of the former estate and other historic 
structures now punctuate the wooded landscape as stone ruins, 
some maintained and others neglected. Now owned by the 
Town of Greenwich, the park is well-used for hiking, nature 
observation, and passive recreation. Increased visitation during 
the COVID-19 pandemic strained the site’s capacity and 
highlighted the need for a master plan to guide maintenance, 
ecological stewardship, historic preservation, and future 
improvements. After the master plan, the Town advanced one 
priority recommendation: evaluating the condition and future 
use of a historic pedestrian boardwalk connecting two hilltops. 
The boardwalk dated to the estate period, and the surrounding 
landscape had become dominated by invasive vegetation, 
affecting native biodiversity, resilience, and visitor experience.
Solution: GZA prepared a master plan for the 100-acre 
municipal park in Greenwich, Connecticut, focused on 
ecological management, historic preservation, and passive 
recreation. GZA conducted an ecological field assessment, GIS 
mapping and analysis, review of the site’s history and planning 
background, and inventory of existing park amenities. GZA’s 
subconsultant, HPI, compiled a narrative timeline of the site’s 
history. GZA also led community engagement, including in-
person public meetings and an online survey hosted by GZA 
that received more than 700 responses. The project team used 
this research and public input to develop master plan 
recommendations.
GZA led public engagement during Master
Planning Phase

Page 359

GZA GeoEnvironmental, Inc. Page  |  1
Johnson Memorial Hospital
Stormwater Construction Permit 
Stafford Springs, CT 
Project Highlights 
 Submission of Stormwater 
Construction Permit 
 Weekly Inspections during 
Construction with Additional 
Inspections after Significant Storm 
Events Turbidity Stormwater 
Sampling 
 Completion of a hydraulic Capacity 
Evaluation Report  
 Design of a 50,000-gallon per day 
Subsurface Disposal System. 
  Construction Oversight 
GZA was contracted by a Connecticut hospital to design a new 50,000-gallon per day 
subsurface disposal leaching field.  At the on-set of the project, the client was under a 
notice-of-violation (NOV).  Their permitted 40,000-gallon per day of treated effluent 
was directed to failing open sand infiltration beds (oldest 1975) and the infiltration 
capacity was insufficient resulting in overflows.  In addition to, the discharge effluent 
from the treatment facility exceeded applicable criteria.   
To resolve the NOV, GZA initially conducted a subsurface investigation to locate a 
large-scale infiltration leaching field.  This included test pits, monitoring wells and the 
measuring of the seasonal groundwater elevations.  These data were used to support 
a hydrogeologic report that calculated the seasonal high groundwater elevation and 
defined the hydraulic conductivity of the unsaturated and saturated subsurface soil.
These data were inputted into a comprehensive 180-day mounding calculation 
(Modflow) to determine the maximum height of the radial mound that would form 
beneath the leaching field under 100- and 150% discharge capacity based upon a 
calculated infiltration rate.  This hydraulic report was accepted by the reviewing 
agency.  
Once the hydraulic capacity analysis was completed, GZA was contracted to design the 
leaching field and associate components to discharge the treated effluent from the 
wastewater treatment facility to the leaching field.  Because the new system was to be 
installed along a slope significant volume of import fill was required.  GZA worked with 
the hospital’s contractor to ensure that the select leaching field fill met applicable state 
criteria, including sample verification from the contractor’s source. GZA observed 
installation of all the leaching field components, the select fill and the low permeable 
containment slope required downgradient of the field and included reviewing various 
contractor as-builds and submittals and final as-builds.     

Page 360

GZA GeoEnvironmental, Inc. Page  |  2
Johnson Memorial Hospital
Stafford Springs, CT
As part of the construction program, GZA was contracted to 
submit and oversee routine inspections of a General Permit for 
the Discharge of Stormwater and Dewatering Wastewater from 
Construction Activities.  This includes defining the stormwater 
erosion and sedimentation controls that the contractor was 
responsible to maintain downgradient of the  active leaching 
field construction, at an adjacent stormwater basin that was 
modification because of the mounding analysis, soil stock pile 
areas and downgradient of the steep slope.  As part of these 
observations, GZA completed inspection reports submitted to 
the client and contractor.  Weather during the construction 
activities was unusually wet requiring the contractor to 
maintain the erosion controls more frequently as identified 
within GZA inspection reports.  In addition, several storm 
events resulted in breaches within the erosion controls that 
impacted wetlands and the upland wetland buffer zones.  GZA 
made recommendations for restoration.  GZA also monitored 
for turbidy on a monthly basis.  All data was submitted to the 
town and the CTDEEP.   
The project was completed, and the state regulatory authority 
issued a permit for the discharge of 50,000-gallons per day of 
treated effluent.      

Page 361

GZA GeoEnvironmental, Inc. Page  |  1
The City of Springfield received funding through the American Rescue Plan Act 
(ARPA), specifically with Early and Secondary School Emergency Relief III funding to 
improve play amenities at a total of 25 different public educational facilities across the 
City.   
Challenge: GZA was tasked with providing 25 different full designs, cost estimation, 
preparation of construction documents, bid phase services and construction phase 
services, all which were separately bid and awarded to a variety of contractors.   
Solution: GZA’s landscape architects developed full bid packages for all 25 different 
schools and provided oversight throughout the entirety of construction at all of the 
separate facilities and with various contractors. Site improvements include new 
accessible playgrounds with poured-in-place rubber safety surfacing, a synthetic turf 
playing field, pavilions, landscaping, and an accessible walking paths and seating 
areas.  
Benefit: GZA’s successful implementation of design, bid phase services and 
construction phase services has led to vast improvements at Springfield public 
schools across the City. The project is nearing completion at all 25 different sites.
Twenty-Five School Playgrounds
Springfield, MA 
Project Highlights 
 Landscape Architecture 
 Civil Engineering 
 Cost Estimating 
 Playground Design 
 Stormwater Design 
 Bid Phase Services 
 Construction Phase Services 
Newly constructed playground at Glenwood School in Springfield, MA.
Accessible playground at Dryden School in Springfield,
MA
Accessible playground at Boland Elementary
School in Springfield, MA
Accessible playground at Indian Orchard
Elementary School in Springfield, MA.

Page 362

Learn more at ceseng.com
By the 
Numbers
Who We Are
Engineering A Brighter Tomorrow, 
For People + the Planet
For more than 30 years, CES has transformed 
the built environment as trusted MEP/FP 
engineers—and as stewards of a sustainable 
future. With eight offices nationwide and a 
hands-on, interdisciplinary approach, we design 
systems that power spaces and uplift people. 
What We Do
Designing Systems that Serve Life Sustainably
At CES, sustainability is more than just a buzzword. We design MEP/FP 
systems that are both technically precise and deeply human-centered. 
From schools and hospitals to libraries and housing, our work prioritizes 
energy efficiency, climate resilience, and occupant well-being.
Sustainable + Practical Solutions  
for the Built Environment
Mechanical 
Electrical 
Plumbing 
Fire Protection 
Commissioning
Net Zero Design
Services
Firm Profile
2 million+
kWh Solar PV + 
Hot Water
9,000+
Tons Geothermal
30+
Net Zero / Net Zero  
Ready BuildingsSelect Experience
Town of Greenwich 
On-call Engineering Services 
Greenwich CT
Town of Manchester + Glastonbury 
On-call Engineering Services 
Manchester + Glastonbury CT
Town of Groton 
On-call Engineering Services 
Groton CT
Town of South Windsor  
On-call Engineering Services 
South Windsor CT
State of Connecticut 
On-call Engineering + Cx Services 
Statewide CT
City of Ansonia 
On-call Engineering Services 
Hartford CT
Town of Suffield 
On-call Engineering Services 
Suffield CT
Town of Simsbury 
On-call Engineering Services 
Simsbury CT
Stamford Public Schools 
On-call Engineering Services 
Stamford CT
East Lyme Public Schools 
On-call Engineering Services 
East Lyme CT
80+
On-call Contracts

Page 363

CES is providing electrical and plumbing engineering design services for 
the redevelopment of city-owned waterfront property in Norwich into a 
vibrant public gathering space. The project transforms an underutilized 
site into a year-round community destination anchored by a combined 
splash pad and ice rink, a new restroom facility, and an event stage for 
public programming.
CES’ scope includes plumbing utilities for the new toilet room and splash 
pad/ice rink, including domestic water and gravity waste piping. Electrical 
design serves the toilet room, splash pad/ice rink, and event stage, along 
with new site lighting for the parking lot, pedestrian areas, and stage. The 
design also incorporates a new security system with CCTV coverage to 
support safe use of the public space.
Coordinated closely with the project’s civil engineer and architect, the 
development rounds out with utility and landscape improvements 
that reinforce Norwich’s investment in accessible, community-focused 
waterfront space.
Norwich Waterfront Development
Norwich CT
New Life to the City’s Waterfront
Scope
New Construction
Construction Cost
$3.85 million
Completion
Est. 2027
Services
Electrical
Plumbing 

Page 364

Harkness Memorial State Park is a magnificently preserved 230-acre 
Gilded Age estate featuring a 42-room Renaissance Revival mansion, 
world-renowned gardens, and sweeping waterfront views of Long Island 
Sound. Of the park’s 60 different structures, 15 are listed on the National 
Register of Historic Places. The Boarding House is one of several historic 
support structures on the property that served the estate’s operations. 
Having fallen out of active use, the building was renovated to return it to 
service as administrative offices for park staff.
CES provided mechanical, electrical and plumbing engineering design 
services for the renovation. New electrical systems included a 120/208V, 
3-phase underground service with generator interconnect for backup 
power, new LED lighting with occupancy sensor controls, and full fire 
alarm, access control, intrusion detection, and video surveillance systems. 
The existing oil-fired HVAC system and oil storage tank were removed 
and replaced with a new VRF system with two outdoor condensing units, 
multiple indoor fan coil units, electric cabinet unit heaters, and an energy 
recovery ventilator exhausting through the existing cupola. 
The existing well-based water supply was abandoned and replaced with a 
new municipal cold water service. New plumbing included two relocated 
bathroom groups with wall-hung water closets, lavatories, and point-of-
use electric water heaters, and a new duplex sump pump in the existing 
basement pit.
Harkness State Park Administration Building
Waterford CT
Restoring a Gilded Age Legacy
Scope
Renovation
Construction Cost
$2.8 million
Size
2,880 sf
Completion
Est. 2026
Services
Mechanical 
Electrical
Plumbing

Page 365

CES held a 3 year on-call MEP/FP engineering services contract for the 
Town of South Windsor. Projects included:
Community Center  
Replacement of five oil fired boilers (two domestic + three heating) with 
natural gas condensing boilers and controls integration
Conversion of one Kitchen MAU, including controls integration
Removal of oil piping and oil pumps inside the building
Police 
Central plant replacement and optimization 
Heat pump and cooling tower replacement
Town Garage 
Conversion of 2 existing garage bays into heated workshop/garage
Town Hall Study 
Existing conditions study of 2nd floor of Town Hall
Town of South Windsor On-call Services
South Windsor CT
Engineering On Demand
Scope
On-call
Construction Cost
Various
Size
Multiple/Various
Completion
2019-2022
Services
Mechanical 
Electrical
Plumbing 
Fire Protection

Page 366

A comprehensive facility assessment was completed for the town of 
Simsbury. The existing conditions of 52 municipal buildings and 7 schools 
were assessed. The study included an existing conditions assessment, 10 
year capital improvement, and a maintenance plan.  The town is using 
the report as a strategic planning tool for detecting and prioritizing 
improvements. At the study’s conclusion, the town decided to refresh 
each of the schools using a neighborhood model, reconfiguring each 
elementary school as a district PreK-6. 
CES provided MEP/FP engineering design services to identify existing 
HVAC equipment and it’s useful life expectancy, detect deficiencies 
related to life safety systems, codes, envelope, indoor air quality, 
lighting, and HVAC systems.  After the initial assessment, CES provided 
recommendations on the most economical approach to equipment 
maintenance and replacement.
Town of Simsbury Municipal + Schools Study
Simsbury CT
Basis for Strategic Planning
Scope
Study + Masterplan
Size
1,040,000 sf Total 
 
725,000 sf     
7 Schools 
 
315,000 sf  
52 Municipal Buildings
Completion
2019/2020
Services
Mechanical 
Electrical 
Plumbing 
Fire Protection
Buildings 
7 Barns + Sheds, Salt Shed 
1 Boat House 
2 BOE Building + Grounds Facility 
1 Boy Scout Hall 
1 Commuter Bus Shelter 
9 Garages, Maintenance Buildings 
1 Library    
5 Memorial Rec Center 
2 Park + Golf Maintenance 
3 Pavilions + Gazebos 
2 Performance Art Center 
5 Pump Houses 
6 Residential Buildings 
1 Senior Center 
7 Schools 
4 Simsbury Farms Rec Complex 
1 Town Hall 
1 Water Pollution Control 

Page 367

WHO WE ARE
At edmSTUDIO, our mission is simple: to work 
collaboratively, deliver designs that exceed 
expectations and have fun along the way. 
We’re a group of curious designers who believe that 
every detail matters. Whether it’s a bold new idea or 
a subtle refinement, we know that it’s the details that 
make all the difference.
From the first conversation to the final ribbon-
cutting, we’re passionate about creating spaces that 
are functional, beautiful and deeply meaningful. 
LISTEN C AREFULLY 
CREATE JOYFULLY 
CARE DEEPLY 
INFUSE EVERY PROJECT WITH CURIOSITY AND ENTHUSIASM.
UNDERSTAND WHAT'S IMPORTANT TO YOU.
STRENGTHEN THE COMMUNITIES WE SERVE.
Our collaborative 
approach always 
begins with 
listening—because 
it's often the 
smallest insights 
that can spark 
the biggest 
breakthroughs. 
When you 
work with us, you’re 
partnering with a team 
that’s as invested in 
your vision as 
you are.
#8 LARGEST ARCHITECTURE FIRM IN GREATER HARTFORD

Page 368

edmSTUDIO provided design services for the renovations and addition 
to the existing pool building at Veterans Memorial Park in Middletown, 
CT. The scope of the project consists of a reconfiguration of the existing 
public facilities with the bathhouse and an addition of new staff spaces 
that support oversight of the pool. The renovation also included upgrades 
to the utility infrastructure within the building that supports the new 
swimming pool and splash pad.
With a focus on making a more impactful first impression, we’ve 
incorporated large graphic signage and a contemporary glassy main 
entry that will instantly engage visitors upon arrival. To blend in with 
the beautiful park surroundings, we’ve added a shaded wood pergola, 
offering a cozy spot to relax. 
The building itself boasts “sho sugi ban” siding, a classic touch that ties 
it to nature, giving the facility a warm and natural feel. Together, these 
features create a delightful space where modernity meets the tranquility of 
the park.
OWNER CONTACT
City of Middletown 
Catherine Lechowicz 
(860) 638-4505
catherine.lechowicz@ 
middletownct.gov
MIDDLETOWN, CT
VETERANS MEMORIAL PARK

Page 369

edmSTUDIO provided design services for a new bathhouse and pool 
for Hamilton Park in Waterbury, CT. This is the first and most important 
phase of a larger plan to revitalize the entire park over the next decade. 
The bathhouse is strategically placed to provide views from the new 
“promenade,” ensuring safety and excitement as you enter the park. A 
large solar canopy serves as a covered entryway and welcoming landmark 
and generates enough solar power to keep the entire facility running 
during the sunny summer months. 
Inside, patrons will be greeted by an abundance of natural light, creating 
a welcoming and bright atmosphere. We’ve carefully chosen durable 
materials to hold up to the test of time, but also have included building 
components like glulam wood beams and tongue & groove wood decking 
to ensure the bathhouse pay tribute to the city’s historical bathhouses, 
connecting the new design with the City’s roots.
To make the bathhouse truly special, a public art mural will be displayed on 
the main exterior facade. This mural not only adds beauty but also fosters 
a sense of ownership and community integration, making the building a 
beloved part of the neighborhood.
OWNER CONTACT
City of Waterbury
John Kollar
(203) 232-5790
WATERBURY, CT
HAMILTON BATHHOUSE

Page 370

Our team served as the architect for the $4 million renovation of the 
Wa
lker Memorial Grandstand in Springfield’s Fore st Park. The century-
old
 structure had  experienced significant deterioration, including 
failing brick piers, compromised structural support systems, and 
wi
despread envelope deficiencies. Scope of work included masonry 
repointing and reconstruction, structural stabilization, roof and 
envelope repairs, and modernization of the dugouts to meet ADA 
requirements.
The pr
oject also addressed essential building infrastructure and code 
compliance upgrades. Public restrooms were fully renovated 
to i
mprove accessibility and capacity, drainage systems were 
mo
dernized, and circulation was reconfigured to support universal 
a
ccess. As the project lead, we directed the coordination of 
mechanical, electrical, plumbing, civil, and landscape systems, 
ensuring seamless integration with the historic fabric of the facility. 
Th
e completed project stabilized a historically significant structure 
a
nd extended its service life while enhancing functionality for athletes, 
sp
ectators, and the broader community.
OWNER CONTACT
City of Springfield
Peter Garvey
(413)
 787-6445
WALKER GRANDSTAND
SPRI
NGFIELD, MA

Page 371

edmSTUDIO provided design services for the replacement of the 
concession stand and press box at Memorial Field Park.
The structure will meet accessibility requirements and includes a new 
wheelchair lift to the second floor press box. Careful attention was made 
to maintain existing view lines from the press box to fields on both sides of 
the structure. The new concession service area was planned to maximize 
functionality and service by the all-volunteer staff.
OWNER CONTACT
Town of Agawam 
Jennifer Bonfiglio 
(413) 726-9742
AGAWAM, MA
MEMORIAL FIELD PARK CONCESSIONS

Page 372

edmSTUDIO provided architectural services for the phased renovation of 
the Page Park Pavilion, a popular community gathering and event facility 
located within Bristol’s Page Park. The project was focused on modernizing 
the existing pavilion to improve functionality, occupant comfort, 
accessibility, and energy performance while preserving its role as a valued 
destination for public events and community activities.
Renovations included upgrades to the building’s mechanical and electrical 
systems, enhanced interior and exterior lighting, accessibility and code 
compliance improvements, and building envelope enhancements. Interior 
improvements support the pavilion’s event space, kitchen, restrooms, and 
support areas, creating a more comfortable and welcoming environment 
for visitors while extending the life of the facility.
OWNER CONTACT
City of Bristol
Dr. Joshua Medeiros  
(860) 584-6195
BRISTOL, CT
PAGE PARK PAVILION RENOVATIONS

Page 373

edmSTUDIO provided design services for the renovation of the bathhouse 
facilities at Washington Park and Fulton Park as part of the City of 
Waterbury’s comprehensive modernization of two of its signature public 
swimming complexes.
The projects transformed aging bathhouse buildings into modern, 
accessible support facilities serving newly reconstructed public pools 
while respecting the character of the surrounding historic parks. 
Renovations included upgrades to the building envelopes, interior spaces, 
accessibility features, and building systems, creating welcoming facilities 
that better serve residents and visitors during the summer recreation 
season.
OWNER CONTACT
City of Waterbury
John Kollar 
(203) 232-5790
WATERBURY, CT
WASHINGTON & FULTON PARK BATHHOUSES 

Page 374

edmSTUDIO is providing architectural services for the redevelopment of 
Howard T. Brown Memorial Park, supporting the transformation of the park 
into a vibrant, year-round community destination. The project includes the 
design of a combination splash pad and seasonal ice rink, complemented 
by support structures for equipment storage and operations.
The project also features ADA-compliant self-cleaning public restrooms, 
a permanent event stage, and comprehensive site improvements, 
including enhancements along the Heritage Trail, utility infrastructure 
upgrades, and the integration of park-wide security cameras. edmSTUDIO 
is responsible for the architectural design, construction documentation, 
and multidisciplinary coordination necessary to successfully deliver these 
amenities as part of the park’s overall revitalization.
OWNER CONTACT
NCDC
Kevin
 Brown
(860) 884-9171 
kbrown@askncdc.com
NORWICH, CT
HOWARD T. BROWN MEMORIAL PARK 
WATERFRONT REVITALIZATION

Page 375

MACCHI ENGINEERS, LLC
Diversified Structural and Civil Engineering Services
ON-CALL ENGINEERING EXPERIENCE
Our firm‘s on-call expertise includes a wide range of services for new construction, additions and renovations, repairs, code
compliance, structural analysis, survey, and construction administration.  Some structural services include new designs, third
party structural review, forensic analysis, seismic analysis, feasibility studies, load rating, code updates, repairs, rehabilitations,
renovations and additions.  We provide a wide range of civil/site services for roadway, sidewalk and parking layout and design,
hydrologic and hydraulic studies, storm drainage, utility relocation and coordination, and traffic engineering.   We have
experience with surveys, environmental permitting, water resources, traffic engineering, construction administration and on-
site inspection. Our firm also has the capacity to provide survey and mapping services, boundary surveys, easement maps,
geotechnical services, and soil testing analyses, HVAC and MEP, architectural modifications and landscaping services
Macchi Engineers provides on-call structural engineering services for many diverse structures including parking garages,
educational facilities, office buildings municipal facilities, dams and bridges.  Some services include structural inspections and
analysis, new structural designs, repairs, rehabilitations, renovations and additions.  Our firm‘s advanced technology includes
the use of the latest AutoCAD software and Building Information Modeling (BIM) using Revit Software.  Our professionals
remain cognizant of new materials and construction methods, which allow our studies of each project to include in-depth
evaluations of functional, technical and economic aspects.  Additionally our design professionals are familiar with FEMA
guidelines and the Homeland Security “Building and Infrastructure Protection Series” for the design of safe schools.  We believe
that the identification of potential hazards related to each project site whether a natural threat or terror related is a critical
element that needs to be addressed in the initial planning phase of a project.
Capitol Region Council of Governments (CRCOG), Hartford, CT
As a qualified vendor we provide structural engineering services for homeowners located in the areas with known defective
concrete consisting of the mineral Pyrrhotite.  Our services include visual inspections and evaluations of existing foundations
documenting our findings in a letter report.  Based on our findings we can advise homeowners and/or homebuyers on the next
steps in this process.  We can develop plans and provide cost estimates and assist with the coordination of core sampling and
testing.  We have provided more than 500 visual foundation inspections for private homes throughout the affected towns.
Town of Vernon, On-Call Structural Inspection Services, Ellington, Stafford Springs and Vernon, CT
Provided on-call structural engineering services in Ellington, Stafford Springs and Vernon, CT. Work performed under this
agreement visual inspection of the exterior and interior foundation walls and slabs on grade of residential properties.  Provide
a stamped engineering letter report documenting the findings with recommendations.  Also provided the coordination of core
sampling and petrographic analysis. We have provided more than 40 visual foundation inspections for this on-call contract.
Webster Bank, N.A., On-Call Structural Inspection Services, Waterbury, CT
Providing on-call structural engineering services in the Connecticut and Massachusetts areas for Webster Bank. Work
performed under this on-call agreement is to inspect and evaluate the structural soundness of residential properties that the
bank may have an interest in.  Services include a visual inspection of the exterior and interior foundation walls and slabs on
grade of residential properties.  Provide a stamped engineering letter report documenting the findings with recommendations.
Additional work may include the coordination of core sampling and petrographic analysis. We have provided more than 300
visual foundation inspections for this on-call contract.
THE TOWN OF DANBURY
Structural engineering support services for various projects services including inspection and analysis, structural design,
structural threshold review.
THE TOWN OF WEST HARTFORD
Continuous engineering support services for various projects for more than 30 years. Work includes structural design for new
construction, repairs and renovations, code updates, and construction administration.
STATE OF CT, DEEP, DAS/CS, CSU, CTC, & UCONN
Structural engineering support services for more than 40 years including inspection and analysis, structural design, structural
threshold review, and construction administration. Provided engineering support to numerous Community / Technical
Colleges throughout the state and for each of the state’s universities.
RTX / UTC / PRATT & WHITNEY ON-CALL STRUCTURAL & CIVIL ENGINEERING SUPPORT SERVICES (for more than
40 years) some services included:
 Load Capacities for Levalators
 Third Party Review of Jib Cranes
 Structural design for fall protection systems
 Catwalk, Roof and Platform Design
 Provide Conduit Routing Plan for Lighting and Sprinkler Systems
 Inspection and design of bridge crane systems

Page 376

Sleeping Giant State Park
Visitors Center
Hamden, CT
REFERENCE: Mr. David Cooley, P.E.
Supervising Civil Engineer
Engineering and Field Support Services
Bureau of Central Services
Connecticut DEEP
163 Great Hill Road
Portland, CT 06480
David.cooley@ct.gov
PRINCIPAL-IN-CHARGE: Michael Plickys, P.E.
CHIEF CIVIL ENGINEER: Herbert S. May, P.E.
PROJECT DURATION: 2023-2026
CONSTRUCTION SCHEDULE: 90 Days / final 150 Days
BUDGET: $500,000 TO $ 1,000,000
BID COST: $893,362
FINAL COST: $937,806
DESCRIPTION: The project consists of the design services for a new
visitor’s center cabin kit to be erected at the Sleeping Giant State Park in Hamden. Also potential
replacement of damaged bathroom building. Project area consist of 1+ acre and includes all the
supporting utility infrastructure such as electrical, water, plumbing, services and subsurface
improvements. Macchi Engineers is responsible for the structural and civil design services and
subconsultant coordination for MEP and Geotechnical Engineering.
Project Experience

Page 377

Town of West Hartford
Projects
REFERENCE: Mr. Christopher Oliver
Manager of Maintenance Services
17 Brixton Street
West Hartford, CT 06110
860-561-7927
Chris.Oliver@westhartfordct.gov
PRINCIPAL-IN-CHARGE: Michael Plickys, P.E.
DESCRIPTION: Our Firm has provided on-call structural and civil
engineering support services to the Town of West
Hartford for more than 30 years on various
projects. Some recent projects include:
Morley School, Performed structural design for wall damage redesign (2026)
Bristow School, Structural engineering services (2026)
Rockledge Golf Club, Structural design services for new driving range (2025-2026)
Conard High School, Performed inspection of loading docks (2022)
Fire Department Training Tower, Performed structural inspection services (2022)
Fire Station #3, Performed site inspection and repairs (2022)
Sedgewick Middle School, Performed inspections and drawings for bathroom (2022)
St. Brigid School, Performed structural inspections and assessment (2021)
Project Experience
Westmoor Park Barn (2015-2016)
Provided the structural investigation and design
services for repairs to portions of the exterior and
interior of an historic 2-story timber framed barn
structure. Also provided structural evaluation of
roof structure and construction administration and
inspection services.
Cornerstone Pool Roof Reconstruction
(2018-2020)
Provided the structural investigation and design
services for installation of a new pool roof.

Page 378

 
Proposal for Professional Engineering Services 
Town of Granby 
 
    
  
  
 
 
 
07 COMPANY PROPOSAL 
07 COMPANY PROPOSAL 
ATTACHMENT 
B Resumes 

Page 379

GZA.  Known for excellence.  Built on trust. 
Education
B.S., 2003, Civil Engineering, Lehigh  
University
M.S., 2006, Geotechnical Engineering,  
University of California
Licenses & Registrations 
2008, Professional Engineer,   
Massachusetts, #47719 
2014, Professional Engineer,  
Connecticut, #PEN.0030556 
2016, Professional Engineer,  
Vermont, #018.0117996 
2016, Professional Engineer, 
New York, #096236 
MA Solid Waste Facility Third Party 
Inspector TIPX263211 
Nuclear Density Gauge Certified  
49 CFR 172 (H) 
Areas of Specialization 
 Geotechnical Engineering 
 Site/Civil Engineering 
 Stormwater Management 
 Subsurface Investigations 
 Solid Waste Management 
 Construction Monitoring 
 Construction Management 
 Environmental Permitting 
Affiliations/Memberships
 Member, American Society of Civil 
Engineers (ASCE/G-I) 
 Association of Dam Safety Officials 
 Boston Society of Civil Engineers 
Training
 OSHA 40-Hour Trained 
 OSHA 10-Hour Trained 
 OSHA 8-Hour Supervisor Trained 
Page | 1
Nathaniel L. Russell, P.E.
Associate Principal / Civil & Geotechnical Engineer
Summary of Experience
Mr. Russell is a Senior Civil and Geotechnical Engineer and leads GZA’s Civil and 
Geotechnical Engineering practice in GZA’s Springfield, Massachusetts office. Mr. Russell 
has extensive experience providing professional engineering services on complex projects 
involving site/civil (land development) engineering, geotechnical engineering and design, 
site investigations, landfill design and permitting, subsurface exploration programs, 
design of shallow and deep foundation systems, design of ground improvement systems, 
retaining walls, temporary support of excavation systems, as well as performing and 
overseeing construction monitoring.  
Mr. Russell’s experience includes Site/Civil and Geotechnical Engineering, Site 
Investigations, Landfill Design and Permitting, Stormwater / ESCP Design and Permitting, 
Wetland Permitting, Environmental Remediation / Brownfields Redevelopment, 
Alternative Energy Site Development (Solar, Battery Energy Storage and Geothermal), 
Construction Management / Construction Quality Assurance, and Litigation Support. 
Geotechnical experience includes developing and executing or overseeing subsurface 
exploration programs, design of shallow and deep foundation systems (spread footings, 
steel H-piles, timber piles, micro piles, and helical piles), MSE retaining walls, estimating 
settlements, and preparing design-phase reports, design and specification of temporary 
support of excavation systems (soil nail wall and soldier pile/lagging), as well as performing 
and overseeing construction monitoring. Construction phase experience includes 
geotechnical inspection and site preparation including deep and shallow foundation 
systems, major earthwork projects (excavation and filling), rock removal (blasting). He has 
performed field inspection and laboratory testing for asphalt, soils, concrete, 
groundwater, and other construction materials.   
Relevant Project Experience 
Civil & Geotechnical Engineer, TPC River Highlands Golf Course, Cromwell, 
Connecticut.  Mr. Russell leads GZA’s project team providing engineering and permitting 
support to the PGA TOUR’s redevelopment of the TPC River Highlands Golf Course, a PGA 
TOUR Championship level golf course.  The phased project is being undertaken by the 
TOUR to enhance the aesthetics and playability of the golf course, repair and replace aging 
infrastructure that had reached the end of its service life and reconstruct the existing 
clubhouse building. GZA’s services have included civil and geotechnical engineering, 
hazardous building material assessment, wetland, environmental and stormwater 
permitting and representation at public meetings.  
GZA assisted the TOUR to design and permit the golf course redevelopment portion of 
the project on an accelerated timeline allowing the PGA to meet their required 
construction schedule (ability to initiate construction in Fall 2015 with completion in the 
spring of 2016 prior to the Traveler’s Championship).  GZA permitted the project with 
USACE, CT DEEP, and the Town of Cromwell (IWWA and Planning and Zoning) and is 
providing stormwater compliance services as required under the CT Construction General 
permit.  

Page 380

Nathaniel L. Russell, P.E.
Associate Principal / Civil & Geotechnical Engineer
GZA.  Known for excellence.  Built on trust. 
 Page |  2
GZA assisted with the design, permitting and construction of the new 39,000± square foot clubhouse. GZA provided site civil, 
geotechnical, hazardous building material assessment, permitting and construction administration services for the project. As part 
of this work, GZA also prepared designs for and obtained permits for temporary administrative and member/guest services facilities 
to allow the golf course to maintain operations during reconstruction of the clubhouse.  
GZA also provided the design and permitting services for replacement to the golf course irrigation water supply line that required 
installation of a new pipeline by pipe jacking (jack and bore) under an active railroad line. GZA developed plans and specifications, 
prepared railroad permit applications and provided construction observation during the work.  
Principal In Charge, Civil/Geotechnical Engineer, Woods Hole Ferry Terminal Reconstruction, Falmouth, Massachusetts.  GZA 
is providing extensive engineering support to the Steamship Authority (SSA) for the ongoing +$150-million reconstruction of Woods 
Hole Ferry Terminal and relocation of their administrative offices to an off-site location.  Mr. Russell is managing GZA’s civil 
engineering services for the phased reconstruction of the Ferry Terminal, including replacement of all three slips (completed), and 
new terminal storage buildings (under construction), The project included design of a new MassDEP compliant stormwater 
management system, new utility services (water, electric, communications and sanitary sewer) and associated infrastructure 
improvements.  
As part of the project, GZA assisted with the civil and geotechnical design for SSA’s new 20,000-sf administrative office building and 
temporary terminal to relocate their administrative services and operational personnel.  
Mr. Russell also assisted with the permitting of the project with local, state, and federal regulators, including filing a wetlands Notice 
of Intent (NOI), Chapter 91 license and Section 401 Water Quality Certification.
Principal-in-Charge, Stanley Quarter Park Pond Dredging and Restoration Project, New Britain, Connecticut.   Mr. Russell was 
heavily involved in the construction phase of this project, which included bathymetry, sediment sampling, plan development, 
permitting, and bid and construction phase services.  This project was for dredging of a pond which is more than 7 acres in extent 
within a major park resource within the Town.  The project also looked at the potential for water quality improvements for the pond.   
Principal in Charge, New Playground Facilities at Public Elementary Schools, Springfield, Massachusetts.  Principal in charge for 
design and construction of twenty-five school playground projects with a construction budget of approximately $12mm funded by 
the Elementary and Secondary School Emergency Relief III grant.  The GZA team successfully lead design and construction of the 
construction project administered by the City of Springfield.  GZA provided civil engineering (site design, stormwater management 
and geotechnical), landscape architecture and construction management services for the project.  
Civil/Geotechnical Engineer, Department of Emergency Services and Public Protection (DESPP) Firearms Training Facility 
Reconstruction Project, Connecticut.  Managed GZA’s civil engineering and geotechnical services in support of the pre-design study 
for the proposed reconstruction of the CT State Police’s existing firearms training facility.  
Geotechnical Engineer, Bushnell South Parking Garage, Hartford, Connecticut. Project consisted of construction of a 6-story 
parking garage in Hartford supported on H-piles with ultimate capacities of up to 894 kips.  The H-piles consisted of HP14x117 and 
HP12x84.   The piles were driven up to 50 feet to bedrock.  Mr. Russell led GZA’s geotechnical services including subsurface 
explorations, pile design, and construction phase services including review of contractor submittals, observation and logging pile 
installation, and pre-production PDA testing.  
Geotechnical Engineer, North Riverfront Park, Springfield, Massachusetts.  Mr. Russell led the geotechnical evaluation of a 
proposed ramp on the levee system sideslope for access to an existing bike path and design of site retaining walls and building 
foundations. The project involves construction of new retaining walls and placement of fill over the riverside slope of a levee that is 
an integral part of the City of Springfield’s flood control system.  As part of the project GZA obtained Section 408 approval from the 
USACE. 

Page 381

GZA.  Known for excellence.  Built on trust. 
Education
M.S., 2012, Landscape Architecture II, 
University of Washington
B.S., 2009, Landscape Architecture,
University of Massachusetts
Licenses & Registrations
Professional Landscape Architect, MA 
#4321 (2019)
MA Municipal Vulnerability 
Preparedness (MVP) Provider (2017)
Areas of Specialization
 Landscape Architecture 
 Construction Phase Services
 Cost Estimation
 Graphic Design
* Project completed at a previous firm 
Page 1
Dan Shaw, PLA, MVP
Landscape Architect
Summary of Experience
Mr. Shaw is a landscape architect registered in Massachusetts. His work focuses on 
designing outdoor spaces that inspire people to form connections with their natural 
environments and their communities. He has designed landscapes for a range of clients 
including architects, municipalities, and state agencies. Dan’s background has given him 
broad knowledge in designing public spaces, parks, trails, playgrounds, and waterfronts.  
Dan is a designer and collaborator who is skilled in project management, participatory 
design, public engagement, and creative problem solving. He performs site analysis, 
conceptual design, cost estimates, construction documentation, construction 
observation, grading design, graphic production including freehand sketching, and 
interdisciplinary coordination on complex projects. He is knowledgeable in green 
infrastructure, resilience planning, built environments that promote health, ecological 
restoration, and planning at both neighborhood and regional scales. 
Project Experience 
Project Manager and Landscape Architect, Pomerance and Tuchman Park Pedestrian 
Bridge, Greenwich, Connecticut. Dan led the design of improvements to a portion of an 
historic municipal park containing a pedestrian bridge over a small, wooded ravine. Project 
included structural evaluation and code compliance review of the bridge, and landscape 
design for the surrounding area including management of invasive species. 
Project Manager and Landscape Architect, Memorial Park Planning Project, Hardwick, 
Massachusetts. Dan led the development of a series of conceptual site design options for 
improvements to a park in the mill village of Gilbertville, located in Hardwick, MA. Services 
included existing conditions assessment, public meetings, an online survey, and 
development of conceptual design alternatives and cost estimates.
Project Manager and Landscape Architect, Anniversary Hill Park Trail Mapping, 
Holyoke, Massachusetts. Dan led the development of a map of existing trails throughout 
an 88-acre woodland park. Project included recording existing trail routes in the field using 
hand-held GPS equipment, and creation of a GIS map of park trails for the City to include 
in park trail kiosks.
Project Manager and Landscape Architect, Granby Recreation Facilities Analysis, 
Granby, Connecticut. Dan led the development of master plans for the Town’s two 
largest public parks. The project included an inventory of existing recreational facilities 
and other site features, interviews with stakeholders, public meetings, and development 
of master plans including estimated costs, proposed phasing, and a summary 
memorandum describing next steps for implementation. 
Project Manager and Landscape Architect, Mittineague Park East Entrance, West 
Springfield, Massachusetts. Dan is currently leading the design of a ten-acre area at the 
east end of a large Town-owned park. The project includes design development and cost 
estimating for new ballfields, playgrounds, splash pad, concessions building, accessible 
walkways, relocated utilities and driveways, and other site improvements. Services also 
include construction documentation for a first phase of improvements. 

Page 382

Dan Shaw, PLA 
Landscape Architect 
GZA.  Known for excellence.  Built on trust. 
 Page 2
Project Manager and Landscape Architect, Alden Street Park, Springfield, Massachusetts. Dan led the design of improvements 
to a City-owned park on the shore of Lake Massasoit in Springfield. Design included an accessible walkway, picnic areas, and fishing 
deck. Project included wetlands delineation and permitting.
Project Manager and Landscape Architect, Harriet Tubman Park, Springfield, Massachusetts. Dan led the design of 
improvements to a City park on the shore of Lake Massasoit. The design included a new playground, exercise area, amphitheater, 
picnic pavilion, basketball court, and fishing area. Services included conceptual design, cost estimating, wetlands delineation and 
permitting, construction documentation, and construction phase services. The project completed construction in 2025. 
Project Manager and Landscape Architect, Improvements to Playgrounds in West Springfield, Massachusetts. Dan led the 
design of a series of new playgrounds for the Town of West Springfield. Project included conceptual design through construction 
documents for nine sites, cost estimating, permitting, and construction phase services. Four of the sites received funding for 
implementation, and finished construction in 2025. 
Project Manager and Landscape Architect, Barrows Park, Springfield, Massachusetts. Dan led the design of a new playground 
and accessible walkways in a City-owned park. The design introduces engaging, accessible, and high play-value play climbing 
equipment into a previously under-utilized neighborhood park. Project included conceptual design, cost estimating, construction 
documentation, and construction phase services, and completed construction in 2025.  
Project Manager and Landscape Architect, Nahorniak Park, Springfield, Massachusetts. Dan led the design of a new playground 
in a City-owned park. The small project site is constrained by existing topography, utilities, and walkways. By creatively selecting and 
locating the playground features, the design creates a new playground that fits seamlessly into the existing park. The project finished 
construction in 2025.  
Project Manager and Landscape Architect, Borgatti Park Pickleball Courts, Agawam, Massachusetts. Dan led the design of new 
pickleball courts, walkways, and park pavilion in a town-owned park. Project included master planning, cost estimating, construction 
documentation and construction phase services.  
Project Manager and Landscape Architect, Conant Park Master Plan, Southampton, Massachusetts. Dan led the development 
of a master plan for a 23-acre town-owned park that includes ballfields, playgrounds, walking trails, drainage improvements, historic 
features and a pavilion and picnic areas. Project included prioritization of improvements, illustrative master plan, and cost estimate.  
Project Manager and Landscape Architect, Pomerance and Tuchman Master Plan, Greenwich, Connecticut. Dan led the 
development of a master plan for a 100-acre Town owned open space. The project included existing conditions assessment of historic 
ruins, ecological conditions, hiking trails and visitor amenities. The project produced a master plan with recommendations for future 
capital improvements and ongoing maintenance for this unique and historic park, including trail improvements, accessibility 
upgrades, and historic preservation, as well as measures to increase climate resilience and biodiversity.  
Landscape Architect, Blunt Park, Springfield Massachusetts. Dan worked with a team at GZA on improvements to the central area 
of a large City owned park, including providing design services for a cultural commemorative garden for the Stone Soul Festival, an 
annual African American music and arts festival held in the park each year. Project design also included playgrounds and a splash pad 
in a woodland setting, including tree protection and careful siting of paths and park improvements. 
Landscape Architect, Magazine Park Master Plan, Springfield, Massachusetts.  Dan led the development of a master plan for a 
3.1-acre neighborhood park owned by the City of Springfield, MA. The plan proposed a series of updates to the park which will create 
a more inviting, well-used space, while re-organizing the currently haphazard layout of park features. Clear entrances and walkways, 
improved visibility, distinct spaces for different user groups, and upgraded playgrounds and amenities will make the park more 
welcoming to a wider range of neighborhood residents. GZA is currently providing full design and construction documentation for 
implementation of the plan.  

Page 383

GZA.  Known for excellence.  Built on trust. 
Education 
B.S., 2005, Landscape Architecture,
University of Massachusetts- Amherst
Licenses & Registrations 
2011, State of Connecticut, Registered 
Landscape Architect, #1198 
2012, Commonwealth of Massachusetts, 
Registered Landscape Architect, #4000 
2017, State of Rhode Island, Registered 
Landscape Architect, #0647 
2019, State of New Hampshire, Registered 
Landscape Architect, #00177 
2026, State of New York, Landscape 
Architect, #003353 
Certifications & Specialized Training 
WEDG (Waterfront Edge Design 
Guidelines) 
Affiliations/Memberships 
 American Society of Landscape 
Architects (ASLA) 
 Boston Society of Landscape 
Architects (BASLA) 
 Waterfront Edge Design Guidelines 
Areas of Specialization 
 Master Planning  
 Site Design 
 Planting Design 
 Construction Document Preparation  
 Designer Construction Phase Services 
 Cost Estimation 
 Graphic Design 
Page | 1
Anja Theresa Ryan Duffy, PLA, WEDG
Senior Project Manager / Professional Landscape Architect
Summary of Experience
Anja leads a team of landscape designers within GZA specializing in creating outdoor 
spaces that are safe, accessible, aesthetically pleasing, and resilient.  Her experience 
includes the production of conceptual site plans, graphic presentations, and preparation 
of construction documents for a variety of public and private site development and 
open-space restoration projects.   Her broad technical knowledge has enabled her to 
successfully manage interdisciplinary projects.   Anja’s approach to landscape design 
stems from nature-based design philosophy, combined with an understanding of how 
people use and enjoy outdoor spaces.  Her landscape designs have resulted in ecological 
restorations, public parks, nature trails, and vibrant urban pedestrian spaces. 
Project Experience 
PUBLIC PARKS & OPEN SPACE
Project Manager and Lead Landscape Architect, New Playground Facilities at 
Twenty-Five Public Elementary Schools, Springfield, Massachusetts.  Led design and 
performed project management for the design for improvements to twenty-five school 
playground projects funded by the Elementary and Secondary School Emergency Relief 
III grant.  Anja led a team in designing and developing bid-level construction documents 
for each school. She performed project management for all 25 projects which were all 
bid and finished in one construction season.  The average cost of development for each 
playground development project was about $500,000.   
Project Manager and Landscape Architect, Putnam Technical Academy High School 
Artificial Turf Athletic Field, Springfield, Massachusetts.  Led design and performed 
project management for the development of an artificial turf athletic field funded by the 
Elementary and Secondary School Emergency Relief III grant.  
Project Manager and Lead Landscape Architect, Blunt Park, Springfield, 
Massachusetts.  Anja led the design effort, beginning with conceptual master plan 
leading to full development of bid-level construction documents for the $1.5 million 
redevelopment project of Blunt Park.   Anja led a team of GZA civil and geotechnical 
engineers and wetland scientists for the design and permitting of site improvements and 
stormwater management systems.  She led and performed designer phase construction 
phase serves.  Project site improvements include new accessible walkways, playground, 
renovated picnic pavilion and picnic grove, water spray play areas, parking lot 
improvements, landscaping, site furnishings, and signage.   
Project Manager Lead Landscape Architect, Kenefick Park, Springfield, 
Massachusetts. Anja led design, staring with conceptual master plan to full design, 
preparation of construction documents, and managed designer construction phase 
services for a multi-phase $1.75 million park redevelopment project. Site improvement 
included accessible pedestrian connections, parking lot, splash pad, playground, picnic 
pavilion, softball field, basketball courts, handball wall, site furnishings, site utilities, 
irrigation, and landscaping. The final phase of the multi-phase project was completed in 
September 2024.  

Page 384

Anja Theresa Ryan Duffy, PLA, WEDG
Senior Project Manager / Professional Landscape Architect
GZA.  Known for excellence.  Built on trust. 
 Page | 2
Project Manager and Lead Landscape Architect, Greenleaf Park, Springfield, Massachusetts.  Anja led the design effort, 
beginning with conceptual master plan leading to full development of bid-level construction documents for the $2.5 million 
redevelopment project of Greenleaf Park.   Anja led a team of GZA civil and geotechnical engineers and wetland scientists for the 
design and permitting of a significant culverted stream headwall replacement project.  She led and performed designer phase 
construction phase serves.  Project site improvements include new accessible trails and walkways, pedestrian bridge, two 
playgrounds, water spray play areas, parking lot improvements, stormwater improvements, lighting, landscaping, site furnishings, 
and signage. 
Project Manager and Landscape Architect | Bike and Skate Park at Gurdon Bill Park | Springfield, Massachusetts.  Led design 
and performed project management for the design and development of a $1.5 million publicly funded park improvement project 
including a 12,000 square foot concrete all-wheels skatepark, playground, splash pad, picnic area, parking lot, nature-based 
stormwater management system, and extensive accessible multi-use pathway system.  The park was completed ahead of schedule 
in July 2025. 
Consultant Reviewer/Senior Landscape Architect, Pomerance and Tuchman Master Plan, Greenwich, Connecticut. Responsible 
for consultant review and contribution of the development of a master plan for a 100-acre Town owned open space. The project 
included existing conditions assessment of historic ruins, ecological conditions, hiking trails and visitor amenities. The project 
produced a master plan with recommendations for future capital improvements and ongoing maintenance for this unique and 
historic park, including trail improvements, accessibility upgrades, and historic preservation, as well as measures to increase climate 
resilience and biodiversity.  
Consultant Reviewer/Senior Landscape Architect, Borgatti Park Pickleball Courts, Agawam, Massachusetts. Ms. Duffy 
performed senior-level designer services and technical review for the development of new pickleball courts within a municipal park 
setting. Her work included review of court layout, pedestrian circulation, accessibility, grading coordination, site furnishings, 
surfacing, and related park improvements to support a durable, functional, and welcoming recreational facility. She provided 
landscape architectural guidance to help integrate the courts into the broader park context while supporting municipal goals for 
active recreation, public access, and long-term maintainability.
Project Landscape Architect, Springfield Senior Center at Blunt Park, Springfield, Massachusetts 2013-2016.  Ms. Duffy provided 
landscape architectural services for the new Springfield Senior Center, a 28,000-square-foot, two-story municipal facility located on 
an undeveloped wooded parcel within Blunt Park. Working as part of GZA’s site civil and landscape architectural team, she 
contributed to the site development design for the new public facility, including landscape coordination for access drives, parking, 
pedestrian plazas, stormwater management areas, and related site improvements. Ms. Duffy provided planting design for the 
project, helping establish a durable, attractive, and context-sensitive landscape that supported the Senior Center’s civic presence, 
complemented the surrounding park setting, and contributed to a welcoming environment for older adults, visitors, and staff.
Project Landscape Architect, Clifford A. Phaneuf Environmental Center, Springfield, Massachusetts.  Anja was the lead 
landscape architect for the redevelopment of an environmental center located within Forest Park, a 700+ acre public park in 
Springfield.  The LEED-accredited project included low-impact design stormwater design including a series of raingardens, 
specification of reclaimed and local materials, and an all-native planting design.  As project manager, Anja led a team of civil 
engineers, environmental scientists, and geotechnical engineers.   The site design fully complied with the Americans with Disability 
Act guidelines, including an ADA-accessible kayak launch and fishing platform on Porter Lake.   The project was completed in Spring 
of 2016, and now is enjoyed as a year-round environmental education center for the City’s public schools. 
Project Landscape Architect, New Elias Brookings School, Springfield, Massachusetts.  Anja was the lead landscape architect for 
the site design of a new elementary school.  Anja worked closely with GZA civil engineers, project architects, and the client 
throughout the design process.  Anja was responsible for laying out the site, including an 80-car parking lot, playing field, accessible 
playground, assembly plaza, accessible walkways, vegetable garden, and resilient/drought tolerant landscaping.  

Page 385

GZA.  Known for excellence.  Built on trust. 
Years at GZA
17 (2008 – present) 
Years with Other Firms
7 
Education
B.S., 2000, Civil Engineering,  
University of Massachusetts-Amherst 
Licenses & Registrations 
2006, Professional Engineer, 
Massachusetts, #46916 
2010, Professional Engineer, 
Connecticut, #27641 
Areas of Specialization 
 Land Development / Site Design 
 Hydrologic / Hydraulic Modeling 
 Water Resources Engineering 
 Freshwater Dredging 
 Stormwater Management 
 Sanitary Sewer System Design 
 Peer Review Services 
 Construction Observation 
 Planimetric & Bathymetric Survey 
Page | 1
Steven T. D’Ambrosio, P.E.
Project Manager
Summary of Experience
Mr. D’Ambrosio is a senior site civil professional engineer with over 25 years of 
experience.  His responsibilities include overseeing the technical and financial operation 
of various projects for which he is assigned to manage, as well as providing technical 
support to projects under the supervision of others.  His project record includes site 
design and permitting for development of both residential and commercial properties, 
sanitary sewer system design, hydrologic and hydraulic modeling, stormwater system 
design, utility coordination, roadway layout and design, and the design and permitting 
for freshwater dredging.  Mr. D’Ambrosio is also a key contributor to GZA’s in-house 
planimetric and topographic survey efforts including site surveys, wetland delineation 
surveys, and lake and pond bathymetric surveys using both Total Station electronic 
survey equipment and Global Positioning System (GPS) equipment. 
Relevant Project Experience 
Project Engineer, Johnson Memorial Hospital Subsurface Sewage Disposal System, 
Stafford Springs, Connecticut.  Prepared construction plans and specifications for a 
50,000 gallon/day pressure-dosed subsurface sewage disposal system (SSDS) servicing 
a 92-bed hospital and 180-bed assisted living facility.  The SSDS is comprised of two 
duplex pump stations, multiple actuated valve chambers, a 5,000-gallon screening tank, 
a 15,000-gallon septic tank, and 11,880 linear feet of leaching trench.  The stepped 
leaching trenches span approximately 4.2-acres of an existing hillside and are installed 
in imported fill to maintain separation from mounded groundwater.  Obtained permits 
for system construction from CT Department of Energy and Environmental Protection 
(DEEP) and participated in multiple site visits during construction as the engineer-of-
record to observe contractor’s work.  Construction of the SSDS was completed on 
September 14, 2018 and was subsequently approved for use by CT DEEP on September 
21, 2018. 
Project Manager, Franconia Golf Course, Springfield, Massachusetts.  Led a 
bathymetric and sediment thickness survey of the Franconia Golf Course irrigation pond 
(1/3 acre) located near the 13th green and 14th tee box.  Collected multiple sediment 
samples from the pond and submitted them to a laboratory for physical and chemical 
analysis.  Prepared permit-level drawings for an emergency dredging of the pond (<100 
CY) to restore irrigation capabilities.  Prepared a second set of permit-level drawings for 
a larger dredging effort (1,400 CY) to restore full irrigation pond capacity.  Dredging was 
completed in the summer of 2023. 
Project Manager, North Riverfront Park, Springfield, Massachusetts.  Prepared 
construction plans and specifications for the decommissioning and replacement of a 
failing septic system at the City-owned North Riverfront Park along the banks of the 
Connecticut River.  Design included installation of a new low-pressure sanitary pump 
station, flushing manhole, and two separate low-pressure service lines connected to an 
existing gravity sewer manhole. 
Project Engineer, Camp STAR Angelina, Springfield, Massachusetts.  Provided 
engineering design for a sanitary sewer duplex grinder pump station as part of the 
rehabilitation and expansion of the former “Camp SECO” in Springfield’s Forest Park. 

Page 386

Steven T. D’Ambrosio, P.E.
Project Manager
GZA.  Known for excellence.  Built on trust. 
 Page | 2
Project Engineer, 990 Housatonic Avenue, Bridgeport, Connecticut.  Provided site design and permitting services for a 19,5000 SF 
Vehicle Maintenance Facility for the City of Bridgeport.  Worked alongside a team of surveyors, MEPs, structural engineers, and 
building architects to provide the City with a comprehensive set of Contract Plans and Specifications.  Project tasks included layout 
of building and facility parking, design of vehicular flow through the site, site grading, stormwater management, utility coordination, 
sediment and erosion control, and landscape architecture. 
Project Manager, Irrigation and Stormwater Runoff Treatment, Granby, Connecticut.  Mr. D’Ambrosio provided stormwater 
management services for a 38-acre section of a 675-acre plant nursery owned by the Monrovia Nursery Company.  GZA’s design 
included a 3,400 CF sediment forebay, and 65,250 CF at-grade stormwater infiltration basin to capture and treat irrigation and 
stormwater runoff from the area of concern.  Additionally, GZA was retained to provide designer services during construction, and 
to review as-built drawings for conformance with the approved design.  GZA was successful in obtaining permits from the East 
Granby Planning & Zoning Commission, and the project was constructed in April 2020. 
Project Manager, 118-122 Elm Street, Enfield, Connecticut.  Provided site design and permitting services for a 7,750 SF retail 
building on a 0.89-acre parcel.  Project tasks included layout of building and facility parking, site grading, stormwater management, 
utility coordination, sediment and erosion control, and landscape architecture.  The project included a high-level stormwater 
overflow connection to a CT Department of Transportation (DOT)-owned stormdrain. Permits were successfully obtained from the 
local Planning & Zoning Commission and CTDOT, and the project was constructed in December 2014. 
Project Manager, Middle Street Drainage System Improvements, Natick, Massachusetts.  GZA was hired by the Town of Natick 
to perform a hydraulic and hydrologic analysis of an existing stormwater management system servicing a 58-acre area of Town.  The 
subject neighborhood is prone to periodic flooding in select low-lying areas.  GZA determined that the existing stormwater 
management system is undersized, and subsequently provided recommendations for improvement, including the installation of 50 
new drainage structures and approximately 4,000 LF of new drainpipe.  The Natick Department of Public Works is actively seeking 
funding to install GZA’s recommended improvements. 
Project Manager, Solar Photovoltaic Facility, Agawam, Massachusetts.  Mr. D’Ambrosio provided engineering site design services 
in support of a 1.8 MW solar photovoltaic facility on a 13-acre industrial zoned wooded parcel.  The project included site grading, 
landscaping, and over 3,300 LF of access roadway.  The design also included siting a new maintenance building, complete with 
utilities, for support services to the installation.   GZA’s design received approval from both the local Planning Board and Conservation 
Commission and is scheduled for construction in the Summer of 2012. 
Project Manager, Williamsburg Estates, Southwick, Massachusetts.  Peer review of a 40-lot residential subdivision on a 155-acre 
parcel.  The subdivision was reviewed for compliance with Town Zoning and Subdivision regulations for the Southwick Planning 
Board, and for compliance with the Wetlands Protection Act and Stormwater Management Policy for the Southwick Conservation 
Commission.  GZA was tasked with determining if the proposed stormwater management system was adequate, and if the 
subdivision road was designed to the Town’s standards and to the standards of general engineering practice for similar activities.  
GZA’s peer review resulted in multiple adjustments/betterments to the project design. 
Project Manager, Mead Park Pond, New Canaan, Connecticut.  Provided design and permitting services for the conventional 
dredging of a 5-acre small town park pond.  The project proposed the removal of approximately 37,000 CY of material.  Mr. 
D’Ambrosio was involved in all aspects of the design and permitting process, from conducting the in-pond bathymetric survey, 
collecting sediment and water samples for analysis, authoring portions of environmental permit applications, to providing 
construction level plans and specifications. 
Project Engineer, Freshwater Pond Restoration, Enfield, Connecticut.  Performed construction observation services for the Town 
of Enfield during the dredging and restoration of the Town owned, 5.5-acre, Freshwater Pond.  Project included dredging 19,000 CY 
from the pond, construction of an in-pond sediment forebay, reconstruction of the pond outlet, construction of a public boardwalk, 
and associated landscaping. 

Page 387

GZA.  Known for excellence.  Built on trust. 
Education
B.S., 2011, Civil Engineering, University 
of Massachusetts Amherst 
Licenses & Registrations 
2019, Professional Engineer, 
Massachusetts, #55402 
Soil Evaluator, #13884, Commonwealth 
of Massachusetts - MassDEP 
Areas of Specialization 
 Civil Engineering 
 Land Development/Site Design 
 Site Layout 
 Grading and Drainage 
Page | 1
Mark Stadnicki, P.E. 
Project Manager 
Summary of Experience
Mr. Stadnicki has experience in various aspects of civil engineering site development 
including layout, grading, utility, drainage design as well as construction support. In 
addition, he has experience in the permitting process which accompanies site civil 
development projects, having prepared permit applications as required by State and 
Local agencies. Mr. Stadnicki also has experience presenting projects before Local 
permitting agencies and the local public.  
Mr. Stadnicki has worked on numerous site civil developments performing such tasks as 
review of local by-laws, evaluation, planning, layout, grading, utility, drainage design, 
preparing engineers opinion of costs, construction specification writing, contractor 
submittal review, and construction observation. Mr. Stadnicki’s civil site development 
experience ranges from evaluations to final design, permitting and construction. Before 
joining GZA, Mr. Stadnicki was with SVE Associates.   
Project Experience  
Project Manager, Massachusetts Maritime Academy, Tower Lane Parking and 
Facilities Garage, Buzzards Bay, Massachusetts. Provided engineering design and 
permitting services for a 2,300 SF 4-bay garage and 5,000 SF of paved parking area on a 
0.46 Ac parcel on the Buzzard’s Bay Massachusetts Maritime Academy. Prepare 
construction plans and specifications for the bidding of the project, as well as provide 
engineering services during construction. 
Project Engineer, North Nashua River Bank Stabilization Project, Leominster, 
Massachusetts. Provided engineering design services for the stabilization of 
approximately 500 L.F. of the North Nashua River bank to protect a 36-in sewer 
collection pipe that flows to the City’s water treatment plan.  
Project Manager, Ashfield Road Improvements Projects, Hawley, Massachusetts. 
Provided civil engineering services for the improvements of 1.2 miles of Ashfield Road, 
including the design of a culvert replacement. Prepare construction plans and 
specifications and assist the Town in the bidding, and construction process of both the 
roadway improvements and the culvert replacement.  
Project Engineer, Kings Corner Culvert Replacement, Hawley, Massachusetts. 
Provided site engineering services for the replacement of an existing culvert under West 
Hawley Road (Route 8A) in Hawley, MA. Assist the Town in obtaining grant funding by 
preparing Massachusetts Department of Transportation Chapter 85 Conceptual Bridge 
Design for approval.  
Project Engineer, Woods Hole Ferry Terminal Improvements, Woods Hole, 
Massachusetts.  Worked as part of a team to provide engineering design, construction 
plans, and specifications for the next phase of the Terminal Improvements as well as 
provide engineering services during the Phase 6 construction.    
Project Engineer, India Point Park Resiliency Project – Phase 2, Providence Rhode 
Island. Work as part of a team to provide designer services for phase 2 of the India Point 

Page 388

Mark Stadnicki, P.E. 
Assistant Project Manager 
GZA. Known for excellence.  Built on trust. Page  |  2
Park Resiliency Project. Provide grading design for the stabilization of the shoreline along the south eastern corner of the park and 
a walkway on top of a berm to provide flood resiliency to the grass field.  
Project Engineer, Bowen’s Pond Dam Removal and Osgood Brook Restoration Project, Wendell, Massachusetts.  Provided 
assistance with cost estimation, quantities, and specifications for a dam removal project.
Project Engineer, Church Manufacturing Co. Dam Removal and Chicopee Brook Restoration Project, Monson, Massachusetts.  
Provided assistance with cost estimation, quantities, and specifications for a dam removal project. Provide Resident Engineering 
services 
Project Engineer, Dredging Projects, Various Locations. Performed field investigation services, including sediment sampling 
related to multiple proposed dredging projects within Massachusetts.  
Project Engineer, Phase I Dam Inspection for Lower Van Horn Reservoir Dam, Springfield, Massachusetts.  Conducted Phase I 
inspection and developed report.   
Project Engineer, Silver Lake Containment Basins, Berlin, Connecticut.  Worked on closeout documents to remove materials 
from prior containment basins from a large multi-phase dredging project.   
Project Engineer, New Haven Country Club, Hamden, Connecticut.  Developed a stormwater improvement plan to address 
overtopping at a water hazard adjacent to a green through the proposed installation of a culvert to provide more efficient drainage.   
Project Engineer, Godfrey Brook Improvements Projects, Milford, Massachusetts.  Prepared construction plans, specifications, 
and opinion of probable construction cost for the improvements of approximately 450 L.F. of Godfrey Brook as part of a multi-
phase flood improvement project in Milford.  
Project Engineer, Carriage Grove Phase 1A & 1B, Belchertown, Massachusetts.   Provided site engineering services for a 108 unit 
housing development (Phase 1A) and supporting renovations to a historic building (Phase 2B). Project tasks include layout, site 
grading, stormwater management, sediment and erosion control.  
Project Experience Prior to GZA 
SVE Associates, Project Manager, NUPRO, LLC., Deerfield, Massachusetts. Provided civil site design and permitting services 
for a 10,000+ SF Manufacturing building in the Town of Deerfield. Project tasks included the layout, stormwater management and 
permitting of the project through the Select Board and Conservation Commission.  
SVE Associates, Project Engineer, Treehouse Deerfield, One Community Place, Deerfield, Massachusetts. Provided site, 
stormwater design and permitting services for multiple phases of the redevelopment of One Community Place in Deerfield. Tasks 
included the layout, site grading, and stormwater management for the site improvements for Treehouse’s Phase 2 redevelopment 
of the property. Also provide design and permitting for a pedestrian trail and pedestrian stream crossing. 
SVE Associates, Staff Engineer, Condominiums at Sugarloaf, Deerfield, Massachusetts. Provided civil site design and 
construction support of a 35 Lot senior housing subdivision on 22 Ac of land at the base of Sugarloaf Mountain in Deerfield, 
Massachusetts. Site design included +/-3,100 LF of roadway, with associated sanitary, sewer, water and stormwater management, 
soil exploration to estimate the seasonal high groundwater for the MassDEP Stormwater Management Standards, provided 
construction layout. 
SVE Associates, Project Engineer, Greenfield Municipal Parking Garage, Greenfield, Massachusetts. Provided civil design for 
the relocation of existing utilities around the proposed site of the municipal parking garage. Provided site layout, grading, 
stormwater design, and construction specifications for the project.    
SVE Associates, Engineer, NEXAMP, Various Sites, Massachusetts. Provided an array of services that ranged from civil site 
design, permitting, and construction support/layout at various NEXAMP project sites throughout Massachusetts.  

Page 389

GZA.  Known for excellence.  Built on trust. 
Education
MS, 2014, Environmental Studies with a 
concentration in Conservation Biology, 
Antioch University New England 
BS, 2004, Environmental Biology, 
Plymouth State University  
Certifications/Training 
 Certified Wildlife Biologist®
(CWB®) 
 Professional Wetland Scientist 
(PWS) 
 Professional Soil Scientist (PSS), 
Soil Scientist Certification – UMass, 
Amherst 
 Certified Erosion, Sediment, and 
Storm Water Inspector (CESSWI) 
 Levels 1 & 2 Venomous Snake 
Handling Course – The Rattlesnake 
Conservancy 
 Combined Field Survey Techniques 
Training – Bat Survey Solutions 
Affiliations 
 Society of Wetland Scientists (SWS) 
 Association of Massachusetts 
Wetland Scientists (AMWS) 
 The Wildlife Society (TWS) 
 Massachusetts Association of 
Conservation Commissions (MACC) 
 Soil and Water Conservation 
Society – Southern New England 
Chapter 
Areas of Specialization 
 Botanical Identification and Survey 
 Wildlife Habitat Assessment 
 Rare Species Assessment, Survey, 
and Permitting 
 Wetland Delineation and 
Permitting 
 Natural Resources Inventory 
 Vernal Pool Identification and 
Evaluation 
 Construction Monitoring
Page | 1
Robin Casioppo, CWB®, PWS, PSS, CESSWI
Senior Ecologist / Technical Specialist
Summary of Experience
Ms. Casioppo is a field biologist who specializes in botany, wildlife, wetland ecology, and 
soil science.  She is responsible for conducting botanical surveys, rare species surveys 
and monitoring (plant and wildlife), wetland delineations, vernal pool assessments, and 
natural resources inventories. 
Ms. Casioppo works as a Project Manager who manages many of GZA’s natural resource 
projects directly or works as a Lead Biologist on a larger team of scientists on larger or 
multi-phase projects. She has conducted numerous rare species surveys (both wildlife 
and plant) with special emphasis on plants, herpetiles, and bat species typically found in 
New England.  Ms. Casioppo is experienced in U.S. Fish and Wildlife Service (USFWS) 
Endangered Species Act (ESA) Section 7 consultation and has conducted numerous 
Phase I habitat assessments and associated permitting for federally and locally rare bat 
species in Connecticut and Massachusetts and has experience conducting capture (mist 
netting) and acoustic surveys. Her herpetile experience includes survey, radio telemetry, 
PIT-tagging, construction monitoring, and handling of various species of turtle, 
salamander, and venomous/nonvenomous snake. Ms. Casioppo is experienced in 
ornithological field studies, including mist-netting, handling, and banding.  Her 
ornithological experience spans from songbird northern forested habitat to shorebird 
coastal habitat throughout New England. She is experienced in botanical field surveys 
consisting of rare species, vegetation observation plots, and species richness and 
abundance.  Her knowledge of plant species is focused on those found in New England 
habitats, including forest, shrub, meadow, inland wetland, and coastal salt marsh 
communities.  She has experience preparing and implementing conservation permits 
under the Massachusetts Endangered Species Act (MESA) along with habitat 
management plans for affected rare species.  Ms. Casioppo has performed numerous 
wetland delineations throughout New England and has supported permitting efforts 
consisting of federal (USACE Section 404), State (MA and CT 401 WQC, MA WPA, CT 
IWWA, RI FWA), and local permits. Ms. Casioppo has also performed numerous wetland 
delineation and permitting peer review services for local Massachusetts Conservation 
Commissions.  
Relevant Project Experience 
Biologist, Stream Habitat Assessments, Various Towns in Massachusetts. Lead 
Biologist responsible for conducting stream habitat assessments, including pebble count 
analysis, wetland delineation, and wildlife habitat evaluations for bridge/culvert 
replacement projects.  
Bradley International Airport Biological Assessments, Hartford, Connecticut. 
Ecologist, conducted rare sandplain plant surveys and mapping, as well as rare moth and 
beetle surveys and habitat mapping. The surveys were in support of the Airport’s Rare 
Species Master Plan. (2020-2021) 
Mansfield Municipal Airport, Mansfield and Norton, Massachusetts.  Ecologist, 
responsible for permitting, field surveys, construction observation and reporting for this 
multi-year 50-acre VMP clearing project in Mansfield and Norton, MA. Multiple years of 
monitoring of vernal pool habitat post- invasive cutting was conducted and reported to 
the Conservation Commission. Other work involved updates to the VMP, development 

Page 390

Robin Casioppo
Senior Ecologist / Technical Specialist
GZA.  Known for excellence.  Built on trust. 
 Page | 2
of site-specific implementation and invasive species control plans, compliance monitoring during cutting and reporting to the 
Conservation Commissions in the two towns where this project occurred. 
Wildlife Biologist, Eastern Box Turtle Monitoring and Contractor Education Training, Utility Transmission Lines in Western 
Massachusetts. Lead biologist responsible for contractor education training, monitoring, and handling of turtles. Responsibilities 
also included the preparation and implementation of a MESA CMP.
Wildlife Biologist, Eastern Rat Snake Monitoring and Contractor Education Training, Utility Transmission Lines in Western 
Massachusetts. Ms. Casioppo was responsible for contractor education training, monitoring, and handling of snakes. Capture and 
handling procedures also included PIT tagging. Responsibilities also included the preparation and implementation of a MESA CMP.
Wildlife Biologist, Solar Array Installation, Plympton, Massachusetts. Ms. Casioppo’s responsibilities included the preparation of 
a MESA Conservation and Management Permit (CMP) with Reptile Protection Plan preparation and implementation. In-field work 
included eastern box turtle surveys and sweeps ahead of construction. 
Wildlife Biologist, Solar Array Installation, Westbrook, Massachusetts. Ms. Casioppo’s responsibilities included the preparation 
of a MESA Conservation and Management Permit (CMP) with Reptile Protection Plan preparation and implementation. In-field work 
included eastern box turtle surveys and sweeps ahead of construction, as well as turtle habitat assessments and wetland delineations.
Ecologist, Rare Species Botanical Survey, Avon, Connecticut.  Ms. Casioppo conducted surveys for Purple Giant Hyssop, Davis’ 
Sedge, Dillenious’ Tick Trefoil, Virginia Waterleaf, Three-leaved False Solomon’s-seal, and Starry Campion. 
Ecologist, Rare Species Botanical Survey, Woodbridge, Connecticut.  Ms. Casioppo conducted surveys for Hairy angelica, 
Puttyroot, Dragon’s-mouth, Boreal bog sedge, Reznicek’s sedge, Hairy lip-fern, Yellow lady’s-slipper, Whitlow-grass, Tall cinquefoil, 
Virginia snakeroot, Fir clubmoss, Water pennywort, Creeping bush-clover, Green adder’s-mouth, Long-awn hairgrass, Eastern prickly 
pear, Warty panic grass, Hoary plantain, Vasey’s pondweed, Sand blackberry, Northern arrowhead, Rough dropseed, Northern 
dropseed, Nodding pogonia, Narrow-leaved vervain, and possum haw. 
Wildlife Biologist, Vernal Pool Surveys, University of Connecticut, Storrs, Connecticut.  Ms. Casioppo’s responsibilities included 
vernal pool identification assessments and surveys in support of construction of a new road. 
Wildlife Biologist, Rare Species Monitoring, Milford, Connecticut.  Ms. Casioppo was responsible for monitoring Peregrine falcon 
nesting behavior pre-construction to compare with nesting behavior during construction. 
Botanical Survey and Critical Habitat Assessment, Groton, Connecticut.  Survey included Solidago sempervirens. 
Botanical Survey, Charlestown, Rhode Island.  Survey included salt marsh species. 
Rare Species Botanical Survey, Agawam and West Springfield, Massachusetts.  Survey included smooth rockcress. 
Rare Species Botanical Survey, Monroe, Connecticut.  Survey included Meadow horsetail. 
ANRAD and Wetland Delineation Peer Review, Warren, Massachusetts.  Project Manager in charge of in-field wetland delineation 
and ANRAD review. 
Wetland Delineation Peer Review, Blandford, Massachusetts.  Consultant Reviewer in charge of in-field wetland delineation 
review. 
ANRAD Wetland Delineation Peer Review, Easthampton, Massachusetts.  In-field wetland delineation review and ANRAD review. 
ANRAD Wetland Delineation Peer Review, Ludlow, Massachusetts.  In-field wetland delineation review and ANRAD review. 

Page 391

GZA.  Known for excellence.  Built on trust. 
Education
M.S. Environmental Science, University 
of New Haven 
B.A. Geography/Urban & Regional 
Planning, Central Connecticut State 
University (cum Laude) 
Licenses & Registrations 
Certified Planner, American Institute of 
Certified Planners 
Certified Environmental Professional, 
National Association of Environmental 
Professionals 
Professional Wetland Scientist, Society 
of Wetland Scientists 
OSHA 10-HR Safety Training 
Fundamentals of Professional Practice 
(FOPPP) Certificate (2021) 
Areas of Specialization 
 Coastal Resiliency Planning 
 Environmental Impact Evaluation 
 Federal/State/Local Permitting 
 Wetland Assessment 
 Ecological Restoration 
 Lake and Pond Management 
 Land Use Planning 
 Dredging & Dredge Material 
Management 
Page | 1
Stephen L. Lecco, A.I.C.P., C.E.P., P.W.S.
Associate Principal/Senior Environmental Planner
Summary of Experience
Mr. Lecco is a Senior Environmental Planner with 38 years of experience in planning, 
permitting and environmental analysis and design for waterfront, airport, highway, 
utility, dam, site development, recreation, ecological restoration, energy facility and site 
remediation projects throughout the U.S. but primarily in the Northeast.  His role in 
these projects has been in project management, agency coordination, public 
participation, report writing, technical analysis, ecological design and mapping.  His 
broad knowledge of many technical elements allows him to successfully manage large-
scale interdisciplinary and complex projects that are required to comply with National 
Environmental Protection Act (NEPA), Section 404/401 Clean Water Act, Coastal Zone 
Management, National Historic Preservation Act, Endangered Species Act, Magnuson-
Stevens Act and other federal, state and local laws, regulations and policies. 
Relevant Project Experience 
Project Manager, U.S. Coast Guard Academy and Station Waterfront 
Improvements, New London, Connecticut.  Managed preparation of State and Federal 
environmental permit applications for demolition and construction of Jacob’s Rock 
Causeway, Main Pie, shoreline road and revetment structures, floating docks and wave 
attenuators as part of Design-Build team.  Prepared Essential Fish Habitat Analysis and 
coordinated with National Marine Fisheries Services (NMFS), CT DEEP, U.S. Army Corps 
of Engineers (USACE) and other agencies. 
Project Planner, Hepburn Preserve Living Shoreline Project, Old Saybrook, 
Connecticut.  Prepared federal, city and State permit applications for proposed living 
shoreline design to protect dune and marsh system adjacent to former estate of 
Katherine Hepburn.  Coordinated with DEEP, USACE and NMFS regarding alternative 
designs.  Assisted in conducting vegetation surveys and design of marsh and relocated 
creek systems. 
Project Manager, Long Wharf Living Shoreline Project, New Haven, Connecticut.  
Responsible for agency coordination and preparation of state and federal environmental 
permit applications for 3,500 linear feet of proposed living shoreline design solution to 
erosion and flooding in the Long Wharf section of New Haven.   
Environmental Scientist, Shoreline Erosion Repair, New London, Connecticut. 
Prepared permit applications for repair of severely eroded shoreline that affected an 
existing sewage pump station.  Local Planning and Zoning approval was attained and 
coordination with DEEP Office of Long Island Sound was carried out to avoid impacts 
below the Coastal Jurisdiction Line (CJL). 
Project Scientist, South Branch Park River Maintenance, Hartford/West 
Hartford/Newington, Connecticut.  For the CT DEEP, developed sampling and testing 
plan for sedimentation areas along 7 miles of river including Park River, Trout Brook and 
tributaries.  Delineated wetlands in and near proposed work areas. 
Principal in Charge, Old Saybrook Hazard Mitigation Plan, Old Saybrook, 
Connecticut.  Principal for preparation of a Hazard Mitigation Plan update that identifies 

Page 392

Stephen L. Lecco, A.I.C.P., C.E.P., P.W.S.
Senior Environmental Planner
GZA.  Known for excellence.  Built on trust. 
 Page | 2
vulnerable Town assets within the community and develops recommendations for avoiding and/or mitigating future losses due to a 
variety of natural hazards, most notably erosion and flooding due to climate change. 
Principal in Charge, Town of Branford, Natural Resource Inventory, Branford, Connecticut. Converted the Towns Natural 
Resource Inventory to an interactive online application through ESRI Web Experience Builder. The web experience relies heavily on 
mapping to tell the story while having a short summary text with links to organizations that provide more in-depth information on 
the topic. 
Principal in Charge, Resilient Bridgeport, Bridgeport, Connecticut.  Project Manager for large-scale flood mitigation project along 
shoreline designed to project existing infrastructure including local neighborhoods, industrial land uses and a public university.  
Provided third party review of NEPA/CEPA document and assisted in the development of a Risk Registry designed to identify project 
risks (e.g. cost, schedule) for the project from planning through construction. 
Principal in Charge, Pomerance and Tuchman Properties Master Plan, Greenwich, Connecticut. Principal in Charge of this project 
involving assessment of resources, public surveys/outreach, and development of site improvement recommendations for 100 acres 
of town-owned open space. Project included historic ruins, hiking trails, visitor amenities and diverse habitats within a heavily 
wooded area. 
Project Manager, Seaside State Park Master Plan and EIE, Waterford, Connecticut. Managed CEPA document for proposed 
redevelopment of new State park.  Evaluated several alternatives including reuse of existing National Register structures for lodging 
with a public/private partnership.  Key issues included historic resources, traffic, economic feasibility, coastal erosion and flooding 
and state-protected species.  Significant public input was provided during the CEPA process. 
Ecological Risk Assessment, Project Scientist, Ecological Risk Assessment, Plainville, Connecticut. Prepared a Screening Level 
Ecological Risk Assessment at a plating facility with historic discharges of metals and PAHs to wetlands and waterbodies in the 
Pequabuck River watershed. 
Project Scientist, Ecological Risk Assessment, Naugatuck, Connecticut. Prepared Screening Level Ecological Risk Assessment at 
a chromium plating facility with discharges to Fulling Mill Brook.  Performed a 7Q10 analysis to estimate contaminant concentrations 
in receiving waterbody. 
Principal in Charge, Glastonbury Open Space and Woodland Management Plan, Glastonbury, Connecticut.  Natural resources 
and trail inventory/assessment at J.B. Williams Park and the former MDC Parcels encompassing over 600 acres of Town-owned 
recreational assets.  Developed public survey and presented results to Town Council and project stakeholders.  Developed 
recommendations for long-term improvements based on survey results and Town resources.     
Principal in Charge, Lower Great Riverfront Park, East Hartford, Connecticut.  Project involves creating a more resilient trail 
system along approximately 2,000 feet of multi-use trail system along the Connecticut and Hockanum Rivers.  Key challenges include 
floodplain impacts, impacts to mature trees, shoreline erosion and floodwater sedimentation.  GZA is working with the Town of East 
Hartford and Riverfront Recapture. 
Project Manager, CT DEEP Trails Study, Connecticut. Managed the assessment of trail conditions along 150 miles of trail within 
Shenipsit, Nipmuck, Cockaponsett and Pachaug State Forests.  Developed a geodatabase for use by the CT Trails Manager for use in 
future permitting of Off-Highway Vehicle events.  Also prepared an analysis of potential new ATV sites within DEP property.

Page 393

GZA.  Known for excellence.  Built on trust. 
Education
B.A., 2003, Anthropology, Sonoma State  
University
M.L.A., 2024, Landscape Architecture,
University of Massachusetts – Amherst
Certifications
WEDG
Cultural Landscape Management 
Certified Playground Safety Inspector 
Awards
Olmsted Scholar 2024, Landscape 
Architecture Foundation 
Affiliations/Membership 
 American Society of Landscape 
Architecture 
 Boston Society of Landscape 
Architects 
Areas of Specialization 
 Landscape Architecture 
 Site Design Layout 
 Grading and Plantings 
 Graphic Design 
 Conceptual Rendering 
Page | 1
Jeffrey Taylor, WEDG, CPSI  
Landscape Designer
Summary of Experience
Jeffrey Taylor is a landscape designer based in Springfield, Massachusetts.  He 
specializes and has experience in producing construction details and documents, 
grading and planting plans, hand-drawn and computer-generated graphics, site 
inventory analysis, master plan documents, and 3D renderings.  He has designed private 
residential schematics, worked on university campus design, planting and restoration 
projects, and has collaborated in producing innovative design solutions for civic and 
public spaces such as streetscapes, parks and children’s playgrounds and spaces.  Jeffrey 
has cultivated strong interpersonal and communication skills, having community 
outreach and engagement experience working with a wide diversity of people from 
different cultural groups and backgrounds   Coupled with his understanding and 
commitment to providing nature-based solutions, green infrastructure and 
environmental justice, he is dedicated to providing these priorities as a part of resilient, 
creative and impactful design solutions.    
Project Experience
Landscape Designer, India Point Park Resiliency Review and Feasibility Study, 
Providence, Rhode Island.  GZA performed an in-depth site assessment and 
development guide which was solicited by The Nature Conservancy on behalf of the City 
of Providence Parks Department.  This included a comprehensive risk assessment 
concerning future impacts of climate change, storm surge, and sea level rise at the park, 
with multiple nature-based design interventions that were subsequently recommended 
to protect existing features and enhance the shoreline for ecological habitat and 
recreational opportunities.  Jeff worked closely with coastal engineers, ecologists, and 
landscape architects to develop conceptual designs that prioritized living shorelines to 
support intertidal habitat through the integration of natural and nature-based protective 
measures, and to conceive of features that would cultivate a safe and accessible public 
waterfront experience at the park for future decades.     
Consultant and Landscape Designer, Salmon Brook Park and Ahrens Park, Granby, 
Connecticut.  Jeffrey worked closely with GZA Project Manager Dan Shaw and staff 
within the Town of Granby to inventory, assess and make recommendations towards the 
park infrastructure and future planning improvements.  His knowledge and experience 
with park operations, logistics and maintenance as a former Park Ranger (see prior 
experience below) made him a valuable resource in providing input and design ideas, as 
well as the orchestration and support of public meetings to gather feedback and share 
information with the community.  Services also included creating master plan proposals 
for both park facilities. 
Landscape Designer, Bay Path Cemetery, Springfield, Massachusetts.  Jeffrey is part 
of the design and development team with GZA Senior Project Manager Anja Duffy for 
this historic cemetery.  He contributed design concepts, renderings and full construction 
plans and drawings, as well as proposed interpretive signage that provides an overview 
regarding the site’s historic significance.  The project is currently under construction. 
Landscape Designer, Greenleaf Tennis/Pickleball Courts, Springfield, 
Massachusetts.  Jeffrey assisted with the design and development with GZA Senior 

Page 394

Jeffrey Taylor, WEDG, CPSI 
Landscape Designer 
GZA.  Known for excellence.  Built on trust. Page  |  2
Project Manager Anja Duffy for new court facilities at this park and was responsible for creating construction documents. The project 
is currently under construction.  
Landscape Designer, G. Frank Adams Park, Springfield, Massachusetts.  Jeffrey is part of the design and development team with 
GZA Senior Project Manager Anja Duffy for this neighborhood park.  He created conceptual designs and analyses prior to developing 
construction plans and details for park improvements that included new walking paths, parking lot, and updated playground facilities.  
Regarding the latter, Jeffrey has studied the importance and safety aspects concerning children’s play and is a Certified Playground 
Safety Inspector through the NRPA.  The project is currently under construction.  
Experience Prior to GZA 
PARK OPERATIONS AND MANAGEMENT 
Park Ranger II, Sonoma County Regional Parks, Santa Rosa, California.  Jeffrey has more than fourteen years of experience in 
managing park facilities including service to the public, maintenance and operational procedures, regulation and code enforcement, 
accounting, reporting and documenting incidents, emergency medical care, supervision of staff and dealing with the needs of park 
visitors. He has handled multiple challenging and confrontational situations involving criminal suspects while enforcing county and 
state penal codes; communicated and acted effectively to ensure personal and public safety. 
Jeffrey has coordinated with supervising rangers in the recruitment, screening, interviewing, and hiring of seasonal staff members, 
as well as experience with counseling and training staff members on job functions and assignments regarding visitor services, 
maintenance tasks, law enforcement options, and emergency procedures. He also conducted, developed, and led guided walking 
tours, cooking programs, backpacking clinics, and other park interpretation events. Acted as lead interpretative ranger for the Central 
Operations and South Divisions regarding issues of public speaking, subject research and investigation, and involvement in volunteer 
events. He has worked as a liaison with tribal citizens of the Federated Indians of Graton Rancheria regarding Tolay Lake cultural 
history, resource protection and interpretation, personal tours and assistance with special events involving the tribe. 
He has collaborated with park planners regarding department facilities, improvements to park properties and programs, operational 
requirements for new acquisitions, and contributions for the development and management of events. 
Jeffrey has experience with the news media and marketing in conducting live and recorded radio interviews and programs for 
broadcasting park events and promoting the department. He developed, wrote, and recorded a weekly solo radio program to foster 
community engagement and stewardship awareness issues surrounding parklands and environmental awareness. 
He has actively worked to improve public safety within park facilities and the community at large; worked as a certified Emergency 
Medical Technician (EMT-B) from 2005 to 2019; achieved the role as a Certified Playground Safety Inspector (CPSI) through the 
National Recreation and Park Association (NRPA); held certification as a Level 9 Safety Instructor for BLS and Wilderness Emergency 
Care by the American Safety & Health Institute (ASHI). 

Page 395

Veteran’s Memorial Park - Middletown, 
CT
Renovation and addition to existing 
pool house, including utility 
infrastructure for new splash pad 
Howard T. Brown Memorial Park 
Waterfront Revitalization - Norwich, 
CT
Park revitalization including a splash 
pad/seasonal ice rink, support 
structures, ADA-compliant restrooms, 
event stage, and associated site 
improvements
Hamilton Park Master Plan - 
Waterbury, CT
Architectural and structural building 
condition, code compliance and 
accessibility review for three structures 
at Hamilton Park in Waterbury.
Washington & Fulton Park Bathhouses 
- Waterbury, CT
Renovations to existing bathhouses 
Hamilton Bathhouse - Waterbury, CT
Design services for a new bathhouse 
and pool for Hamilton Park in 
Waterbury, CT 
Walker Grandstand Study - 
Springfield, MA 
Renovation of the Walker Memorial 
Grandstand in Springfield’s Forest 
Park. 
Senior Center Feasibility Study & 
Renovations - Manchester, CT
Facility Needs Analysis, Programming, 
Site Evaluation, Renovation of Existing 
Senior Center
City of Waterbury - Waterbury, CT
Assessment of eight existing fire 
stations within the City; design for Fire 
Station #07
Municipal Campus Master Plan - 
Mansfield, MA
Creation of a municipal services 
campus master plan, including the 
Senior Center, Community Center, and 
Town Hall. 
University of Connecticut - Storrs, CT
Avery Point TIP Program Building 
Renovations, Accessibility 
Renovations, Longley Building 
Assessment/Renovation, Whitney 
Dining Hall
With hands-on experience in the construction industry and refined 
architectural design skills, Chris is an asset to every project he manages. 
His effective communication skills, attention to detail, and knowledge 
of resource-efficient buildings result in innovative design and seamless 
project management.  
Years of Experience with edmSTUDIO: 16
EDUCATION
B.Architecture - 
Wentworth Institute 
of Technology
CHRIS WANTE, AIA
PRINCIPAL/PROJECT MANAGER
SELECT EXPERIENCE
REGISTRATIONS
Connecticut #14554
New York #39503
Massachusetts 
#953063
MEMBERSHIPS
American Institute 
of Architects (AIA)
US Green Building 
Council

Page 396

Brad has a natural curiosity about how buildings work and enjoys 
seeing how all the pieces come together. With a degree in Architectural 
Engineering Technology, he brings a broad understanding of building 
systems and the relationship between architectural, structural, and MEP 
design. That perspective helps him keep the bigger picture in mind while 
developing mechanical solutions that fit smoothly within the overall design.
On projects, Brad enjoys the problem solving that comes with coordinating 
building systems and finding practical solutions that support the broader 
design goals. He values collaboration with the design team and looks for 
opportunities to improve efficiency and constructability throughout the 
project. Outside of work, Brad supports programs that promote wildlife 
protection and the conservation of land and natural resources.
Brad Park
Principal in Charge 
Greenville Elementary School | Norwich CT
80,000 sf | Masterplan + New Construction
Town of Suffield | Suffield CT 
489,538 sf | Facility Assessment Masterplan
Harkness Memorial State Park | Waterford CT
11,500 sf | Assessment + Historic Reno | Park Office, Maintenance Building + Greenhouse
Norwich Public Schools | Norwich CT
14 Buildings | Study + Masterplan
Norwich Waterfront Park | Norwich CT
New Development
Simsbury Town Hall | Simsbury CT
Rooftop Unit Replacements
Stanton Elementary School | Norwich CT
80,000 sf | Masterplan + New Construction
Waterbury Chase Building | Waterbury CT
100,000 sf | Historic Renovation | Municipal Space
West Hartford Public Safety | West Hartford CT
104,000 sf | Study | 5 Fire Stations + Public Safety HQ 
Contact
bpark@ceseng.com 
Experience
Consulting Engineering Services 
2018-present 
Prior: 6 years
Education
BS Mechanical Engineering 
Vermont Technical College 
Randolph VT

Page 397

Brittany brings energy and enthusiasm to every project she supports. As 
a mechanical engineer focused on plumbing and fire protection systems, 
she works closely with project teams to interpret codes, coordinate design, 
and help ensure systems are practical and well integrated within the overall 
building. She enjoys collaborating with colleagues and contributing to 
solutions that keep projects moving forward.
She is also deeply involved in mentoring and outreach within the 
engineering community. Brittany currently serves as President of the 
Connecticut Chapter of ASHRAE and regularly speaks with students and 
young professionals about careers in the field. Standing just five feet tall, 
she once played center on her high school hockey team and today stays 
connected to the sport as a Level 4 certified USA Hockey referee.
Brittany Conry PE
Project Manager
Bloomfield Fire Station #3 | Bloomfield CT
12,970 sf | Study + New Construction
Bulkeley High School | Hartford CT
330,000 sf | Renovate as New + Addition | Includes Library
Pumpkin Delight Elementary School | Milford CT
53,000 sf | Renovation
Southington Library | Southington CT
29,000 sf | New Construction
The Towers at Tower Lane | New Haven CT
The Towers at Tower Lane | New Haven CT
Trumbull Public Schools | Trumbull CT
10 Schools + 3 Buildings | Assessment + Masterplan
Valley Shore YMCA | Westbrook CT
9,000 sf | Renovation
Waterbury Chase Building | Waterbury CT
100,000 sf | Historic Renovation | Municipal Space
Contact
bconry@ceseng.com 
Experience
Consulting Engineering Services 
2020-present
Education
BS Mechanical Engineering 
University of Connecticut 
Storrs CT
Licenses
Professional Engineer 
Fire Protection 
MA 
Memberships
American Society of Heating,  
Refrigerating and Air Conditioning  
Engineers (ASHRAE)
2025-2026 President
New England Healthcare Engineers’  
Society (NEHES)
Certifications
ASSE 6060 Designer

Page 398

Kathleen has always been the kind of person who takes things apart just to 
understand how they work. That curiosity carries into her work as a certified 
Passive House designer, where she focuses on thoughtful, sustainable 
building strategies. She enjoys digging into ideas with the team and working 
through challenges together to find solutions that support the whole project.
Collaboration and problem solving are a big part of what motivates 
Kathleen day to day. She values open conversations across disciplines and 
the chance to explore new approaches that improve building performance. 
At home, that same curiosity shows up in the kitchen, where she enjoys 
experimenting with new recipes and learning the science behind food.
Kathleen Baker PE, CPHD
Senior Mechanical Engineer
Brimfield Town Hall | Brimfield MA
8,000 sf | Renovation + Addition
Cromwell Middle School + BoE | Cromwell CT 
96,000 sf | New Construction
Eno Memorial Hall | Simsbury CT
Geothermal + HVAC Feasibility Study
Lincoln Community Center | Lincoln MA
20,500 sf | New Construction | Net Zero
Manchester Public Library | Manchester CT 
75,000 sf | Study + New Construction | Targeting Net Zero
North Brookfield Fire Station + DPW | North Brookfield MA
18,000 sf Study | 4,000 sf Renovation
Norwich Waterfront Park | Norwich CT
New Development
West Hartford Public Safety | West Hartford CT
104,000 sf | Study | 5 Fire Stations + Public Safety HQ 
Wilton Police Department | Wilton CT
16,000 sf | Study + New Construction
Contact
kbaker@ceseng.com 
Experience
Consulting Engineering Services 
2023-present 
Prior: 8 years
Education
BS Mechanical Engineering 
Rensselaer Polytechnic Institute   
Troy NY
Licenses
Professional Engineer 
Mechanical 
CT WI
Memberships
American Society of Heating,
Refrigerating and Air Conditioning
Engineers (ASHRAE)
Certifications
Certified Passive House  
Designer (CPHD)

Page 399

Kevin specializes in technology systems design, with expertise in 
telecommunications, security, audiovisual, and other low-voltage systems 
that support modern building environments. He enjoys helping clients 
navigate complex technology needs and translating project goals into 
practical, coordinated solutions that are both effective and easy to 
implement.
Drawn to projects where multiple systems must work together seamlessly, 
Kevin works closely with project teams to develop infrastructure that 
supports communication, connectivity, and security. He values collaboration 
and enjoys finding creative ways to integrate technology into the built 
environment while keeping the end user experience in mind.
When he’s not working, Kevin can often be found planning his next 
adventure and checking another national park off his ever-growing list.
Kevin King PE, CTS
Technical Leader // Senior Electrical Engineer
Bloomfield Fire Station #3 | Bloomfield CT
12,970 sf | Study + New Construction 
Colt Park | Hartford CT
Site Lighting | Sport Courts
Elizabeth Park | Hartford CT
Site Lighting | Electrical Upgrade
Elmwood Community Center | West Hartford CT
82,000 sf | New Construction
Hartford Public Library, Park Branch | Hartford CT
11,500 sf | New Construction
Lincoln Community Center | Lincoln MA
20,500 sf | New Construction | Net Zero
Southington Library | Southington CT
29,000 sf | New Construction
West Hartford Public Safety | West Hartford CT
104,000 sf | Study | 5 Fire Stations + Public Safety HQ 
Wilton Police Department | Wilton CT
16,000 sf | Study + New Construction
Contact
kking@ceseng.com 
Experience
Consulting Engineering Services 
2013-present 
Education
BS Electrical Engineering 
University of Connecticut 
Storrs CT 
Licenses
Professional Engineer
Electrical 
CT FL HI MA RI 
Certifications
Certified Technology Specialist (CTS) 

Page 400

Mckenzie brings an optimistic, positive mindset to each project she 
supports. Known in the office as a go-to Revit and training resource, she 
enjoys helping teammates understand how plumbing and fire protection 
systems work. Her ability to break down complex code requirements and 
design questions into clear, practical explanations makes her a valuable part 
of the team.
Mckenzie also has a strong eye for coordination, especially when projects 
involve tight or unconventional spaces where systems need to fit together 
carefully. She enjoys working through those puzzles with the broader design 
team across disciplines to find solutions that make sense for the whole 
project. When she is not at work, she can proudly say she once made it to 
the finals of an all women’s cornhole tournament.
Mckenzie Trevethan 
Plumbing + Fire Protection Engineer
Chicopee Maintenance Garage | Chicopee MA
9,000 sf | New Construction
Fred D. Wish Elementary School | Hartford CT
91,365 sf | Renovate as New | Includes Recreation Space
Hartford YWCA | Hartford CT
16,200 sf | Renovation
Lincoln Community Center | Lincoln MA
20,500 sf | New Construction | Net Zero
Mansfield Town Hall + Community Center | Mansfield CT
Existing Conditions Study + Design for Renovation
Norwich Waterfront Park | Norwich CT
New Development
Sage Park | Berlin CT
Renovation | Restrooms
Warwick Police Department Garage | Warwick RI
7,125 sf | New Construction
Woodrow Wilson Recreational Center | Middletown CT
42,000 sf | Study + Renovation
Contact
marmington@ceseng.com 
Experience
Consulting Engineering Services 
2019-present
Education
BS Mechanical Engineering 
Fairfield University 
Fairfield CT
MS Mechanical Engineering 
Fairfield University 
Fairfield CT
Memberships
American Society of Heating,
Refrigerating and Air Conditioning
Engineers (ASHRAE)

Page 401

                                                MACCHI ENGINEERS, LLC 
 
Diversified Structural and Civil Engineering Services  
 
 
MICHAEL PLICKYS, P.E.  
PRINCIPAL IN CHARGE 
EDUCATION 
University of Rhode Island, BSCE, 1986 
Lehigh University, MS Structural Engineering, 1988 
Chi Epsilon – Civil Engineering Honor Society 
Tau Beta Pi – National Engineering Honor Society  
PROFESSIONAL REGISTRATION 
Connecticut 1991, Massachusetts 2014, New York 2015, Rhode 
Island 2015, Certified OSHA 10 
PROFESSIONAL ACTIVITIES 
Adjunct Professor:   CCSU, New Britain, CT, Capital Community 
College, Hartford, CT, University of Hartford, West Hartford, CT 
PROFESSIONAL RECORD 
Michael Plickys, P.E., is the Principal in Charge and is responsible for 
overseeing and supervising all projects.  He has been with Macchi 
Engineers since 1989 as a design engineer of reinforced concrete, 
steel and timber structures for various building  applications.  His 
expertise includes feasibility studies, structural investigation and 
analysis, structural design for new construction, renovation and 
upgrades, third party threshold review, and special inspection 
services.  He is extremely proficient in developing BIM  Modeling 
utilizing Revit Software.  Additionally, Mr. Plickys is responsible for 
defining scope of work, contract negotiation, client liaison and quality 
control procedures. 
LIST OF PROJECTS 
Birch Grove School Replacement, Tolland, CT  
Structural and civil design services for the complete replacement of an 
existing 92,000 SF school that has a crumbling foundation. The new 
85,000 SF school building accommodates 509 students. Civil/site 
work included development of new entry areas, new par king lot, 
service areas, vehicular circulation, new outdoor courts and terraces, 
site walks, stairs, ramps and accessibility.  
CVH Old Power Plant Renovations, Middletown, CT  
Structural design services for the new roof support structures.  Work 
includes demolition and reconstruction work. 
ECSU Police Station, Willimantic, CT 
Structural and civil design for a new two-story, approx  8,500 SF fire 
station.  Structure consists of wood framing, masonry veneer and 
seam metal roof. Civil/site development included the demolition of the 
existing buildings, drives and parking lot and the construction of a new 
access drive, sidewalks, parking lot, sanitary sewer, storm drainage, 
domestic and fire services.  Coordinated work with the Charter Oak 
Road Widening Project.  Also upgraded campus tele/data and 
electrical services. 
Enfield Fire Station, Enfield, CT   
Structural and civil design for a new two -story, 16,000 SF, 3 1/2 bay, 
brick and steel framed structure with timber roof trusses 
encompassing 30 rooms plus an apparatus room. 
E.T. Grasso Technical High School, Groton, CT  
Provided the structural and civil design for a new 243,000 GSF 
vocational education high school building and 5,000 GSF garage.  
Fred D. Wish PreK to 5th Grade Elem School, Hartford, CT 
Structural design for a new 75,000 SF elelmentary school building.  
Project is delivered with the development of Building Information 
Modeling (BIM) using Revit Software. 
Hartford Public Safety Complex, Hartford, CT  
Project Manager for the structural and civil design services for the 
construction of a new Public Safety Complex.  The new complex 
houses all the public safety divisions for the City of Hartford including 
fire, ambulance and police facilities.  Project als o includes 140 car 
parking deck and miscellaneous ancillary buildings. 
HPL-Park Branch (Lyric Theater), Hartford, CT 
Provided structural and civil engineering services for the construction 
of a new 2 -story building at the location of the existing Lyric Theater. 
The addition contains a partial below grade basement and the total 
area of the new addition is approximately 20,000 GSF. 
 
Hartford Trinity Magnet College Academy, Hartford, CT    
Structural design services for the construction of a new 70,000 SF 
addition and renovations to existing school .  Project was delivered 
with Building Information Modeling (BIM) using Revit Software.  
Martin Luther King, Jr. School, (MLK) Hartford, CT 
Structural design services including the structural assessment for 
the conversion of the existing MLK School into a new Middle 
School/Magnet School campus to accommodate 800 students.  The 
project includes approx. 140,000 SF of renovations and 34,000 SF 
of new construction.  The project a “renovate-as-new” was delivered 
with Building Information Modeling (BIM) using Revit Software. 
Marin Garfield Open Space Fire House, Bridgeport, CT 
Structural design for a new two -story, two -bay, steel framed 
structure with light gauge metal truss roof.  Structure supported by 
a shallow spread footing foundation.  Plan area approx. 13,000 SF.       
Mattatuck Factory Reuse Project, Waterbury, CT 
Development of a site remediation and reuse plan for abandoned 
Mattatuck Factory.  Proposed plan included a four -bay fire station 
with an adjacent satellite police station and a senior center. 
Plainfield Fire Department Headquarters, 12 Railroad Ave, Plainfield, 
CT Civil / site engineering for the construction of a new Fire Department 
Headquarters at the site of a former catholic school.  Work includes 
stormwater, sanitary and water design services. 
Rockville Courthouse Parking Structure, Rockville, CT  
Design/build project – provided the structural design services for the 
construction of a new 3-story parking structure for 173 cars. 
Sisson Avenue Fire Station #3, Hartford, CT   
Structural design and construction inspection for Hartford firehouse. 
Southington Police Facility, Southington, CT 
Structural and civil design of a new single -story, 30,000 SF police 
facility. 
Sleeping Giant State Park, New Visitors Center, Hamden, CT 
Structural and civil engineering for the construction of a new visitor 
center cabin. 
Tolland Fire Station 140, 64 Crystal Lake Road, Tolland, CT 
Work included site survey and structural inspections and monitoring 
of a crumbling foundation of an existing firehouse. 
UConn Hockey Arena, Storrs, CT  
Structural design services for a new a 2,400 seat capacity Division 
One Hockey Arena with a new three-story elevator.  The new arena 
is a steel-braced framed structure supported on a shallow footing on 
Rammed Aggregate piers.  Work completed included the D esign-
Build “Bridging” Enhanced Schematic Design Documents.  The 
Project was delivered with Building Information Modeling “BIM” 
using Revit Software. 
Waterbury Senior Center and Fire Station, Waterbury, CT 
Analysis and review of former manufacturing site to determine the 
feasibility of the development of a reuse plan to include a new fire 
station and senior center. 
WCSU Police Station, Danbury, CT 
Civil design for a new 8,100 SF police station with LEED Silver 
design and construction on the Midtown Campus.  Civil/site work 
includes layout of parking areas and walkways, grading, 
landscaping, utilities and storm drainage design.  The project 
included a pre-design study and site selection.   
Williamstown Firehouse Facility, 562 -574 Main Street, 
Williamstown, MA 
Structural design services for a new 27,000 SF firehouse facility.  
Project was delivered with the development of Building Information 
Modeling (BIM) using Revit Software. 
Windham Region Transit District, Mansfield Center, CT 
Structural and civil design for improvements and expansion to the 
existing CT DOT Windham Region Transit District Facility site, 
maintenance building, and cold storage building. 
Windham Community Memorial Hospital, Emergency Dept and 
Outpatient Services, and Relocation of Helipad, Windham, CT 
Provided structural and civil design of three separate additions to 
existing hospital, relocation of helipad and civil design of extensive 
storm drainage system.   
XL Center, McGinley Elevator, 1 Civic Center Plaza, Hartford, CT  
Structural design services for the installation of a new four -story elevator 
including construction administration and inspection. 
 

Page 402

 MACCHI ENGINEERS, LLC 
 
Diversified Structural and Civil Engineering Services 
 
GEORGE D. BITTEL 
PROJECT ENGINEER 
 
EDUCATION 
University of Hartford, West Hartford, CT, BSCE, 2023 
President’s List – University of Hartford 2020 
Dean’s List – University of Hartford 
University of Hartford Regents Scholarship 
AI Savin Scholarship 
 
AFFILIATIONS 
American Society of Civil Engineers 
Institute of Transportation Engineers 
PROFESSIONAL REGISTRATIONS 
License: E.I.T. 
 
PROFESSIONAL RECORD 
George Bittel’s  experience as a project engineer includes 
working closely with supervisors, inspectors and 
subconsultants.  Mr. Bittel’s project assignments range from 
design engineer to project engineer .  Mr. Bittel is extremely 
proficient with the use of Auto Cad, Ram Structural Systems, 
Ram Beam Analysis software, Microsoft Office 365, Civil 3D, 
SYNCHRO, Highway Capacity Software (HCS), SAP2000, 
Matlab, PIMA Scheduling, C++, SolidWorks. 
LIST OF PROJECTS 
DEEP Necropsy Lab -Sessions Woods Wildlife 
Management Area, Burlington, CT 
Project Consists of a wood- framed 3,300 SF Necropsy Lab 
and support /storage spaces.  Responsible for specification 
updates, CAD work and permitting assistance. 
ConnDOT, Newington, CT 
Office of Construction – Quality Assurance 
Compiled data from 500+ VE studies and post -construciton 
reviews. Used Bluebeam to produce writeable report 
templates for blank post-construction review templates. 
Barkhamsted Old Hartford Road Senior Development, 
Barkhamsted, CT Civil/site development for land development 
for a total of four(4)-five (5) unit buildings situated on approx. 
5 acres. Work includes subconsultant coordination for 
geotechnical, survey and wetlands delineation. 
Beer Code at Bradley Airport, Windsor Locks, CT 
Structural engineering for roof top mechanical supports. 
New PEMB Foundation, Bloomfield, CT  
Providing structural engineering services for the design and 
detailing of a foundation and slab on grade systems, site 
equipment pads, and an internal standalone mezzanines.  
Overall the project involves the construction of a new single 
story (Cannabis) pre -engineered metal building with a plan 
area of approx. 40,000 SF. 
608 Main Street, New Britain, CT 2015 (CHFA) 
Structural engineering services for the assessment of the 
existing Historic Berkowitz Building.  The overall project 
consists of the residential and commercial renovation of the 
Berkowitz building and potential commercial and residential 
new construction.  Currently providing the structural design 
services for the development of new housing “Crysalis Towne 
Houses”.  
Lapenta Boys & Girls Club, Hartford, CT 
Project Engineer for the expansion and renovations to the 
Joseph D. Lapenta Northwest Boys & Girls Club includes a 
new 18,000 SF addition.  The project is funded by the State 
of Connecticut Department of Children and Families CT DCF 
grant. 
Keeney Elementary School Renovation, Manchester, CT 
Structural design services for a renovate- as-new project.  
Major renovations and additons to and existing elementary 
school. 
State Police Troop A, Southbury, CT 
Work includes structural and civil design services for Troop A 
generator replacement and service upgrade.   
Marder Seafood, New Bedford, MA 
Structural design services for new  exterior addition and an 
interior mezzanine. 
Norwalk Community College Roof Study, Norwalk, CT 
Structural investigation and analysis of the Norwalk CC 
existing roof. 
NVCC Parking Garage and Plaza Repairs, Waterbury, CT 
Project Engineer for the structural engineering services for 
repairs for the 76,000 SF Plaza Deck, and the two- story, 
196,000 SF, 550-carAcademic Core Parking Garage which is 
located below the Plaza and the Ekstrom Parking Garage.  
79 Elm Street, Hartford, CT 
Structural repairs for an existing below grade vault and 
loading dock areas located on the south side of the original 79 
Elm Street Building.  Work includes in-depth visual inspection 
and structural analysis for mech/electrical Vault and loading 
dock structural repairs. 
St Vincent de Paul, Middletown, CT 
Structural engineering services for the design of a 15,000, 4-
story building for spportive housing and services center for St 
Vincent de Paul. 
Waterbury Superior Courthouse Parking Garage Repairs, 
400 Grand Street, Waterbury, CT 
Project Engineer for the investigation and structural repairs to 
an existing 1998 five-story precast concrete structure. 
Williamstown Fire House, Williamstown, MA 
Structural design services for the construction of a new 
27,000 SF firehouse facility. 
 
UTC, PRATT & WHITNEY PROJECTS 
Pratt & Whitney UTRC CLCS Tank Hoist Review , East 
Hartford, CT Provided engineering services for hoist review. 
Pratt & Whitney A-Building, East Hartford, CT 
Provided engineering services for Column, G5- 1 Ton Hoist 
upgrade. 
Pratt & Whitney Oil House (Burner Rig) East Hartford, CT 
Provided engineering services for elevated platform analysis. 
Yarde Metals (Production Equipment, Southington, CT 
Structural design ser vices for a 10- ton crane system 
evaluation. 
York Correctional Institute, Animal Rescue Barn,  Niantic, 
CT Civil/site engineering services for a prefabricated 
bathroom with a shower, insulated walls and ceiling, electrical, 
lighting, heating, ventilation, plumbing (sewer, hot and cold 
water) connection points.  Work to include design for insulated 
concrete slab, ADA Accessibility for the bathroom and an 
existing office, sanitary tie- in, potable water connectins, 
underground conduit run and prefaricated specification.   

Page 403

 
Proposal for Professional Engineering Services 
Town of Granby 
 
    
   
  
 
 
07 COMPANY PROPOSAL 
07 COMPANY PROPOSAL 
07 COMPANY PROPOSAL 
ATTACHMENT 
C Cost Proposal 

Page 404

Page 7 of 7 
APPENDIX A 
Cost Proposal 
Name of Engineering Firm: ___________________________________________________ 
Services Needed 
On-Call Engineering and Related Services 
Please indicate your firm’s hourly fees over the five-year period of the contract 
Billing Category Hourly Billing Rate 
Project Manager ________________ 
Chief Engineer ________________ 
Engineer ________________ 
Technician Support  ________________ 
Clerical/Researcher  ________________ 
Other  ________________ 
Other Expenses (if applicable): 
Identify any other categories and costs required to provide Engineering and On-Call 
services that are not included above:  
________________________________________________________________________ 
________________________________________________________________________ 
________________________________________________________________________ 
See attached for GZA's full list of rates and Subcontractor's rates.
GZA GeoEnvironmental, Inc.

Page 405

2026 Fee Schedule – Granby CT On-Call 
Page | 1 of 1
SPR-CY26-2.37L – GRANBY CT ON-CALL
Client (“You”): Town of Granby
Proposal No: 15.P000095.27 
Date: July 21, 2026 
A. FEES FOR SERVICES 
Fees for services will be based on the time worked on the project by personnel plus reimbursable expenses.  Labor related fees will 
be computed based on actual time worked on the project, including time required for travel from the GZA office to/from project 
site, and according to the rates listed below.  
Classification Hourly Rate 
Technician II $86 
Technician I $109 
Staff Engineer/Scientist II/Landscape Designer II $117 
Staff Engineer/Scientist I/Landscape Designer I $126 
Technical/Administrative Support $137 
CAD/Technical Designer $137 
Assistant Project Engineer/Scientist/Landscape Designer $152 
Senior CAD/Technical Designer $165 
Project Engineer/Scientist/Landscape Architect $183 
Senior Wetland Scientist $215 
Senior Project Engineer/Scientist/Landscape Architect $215 
Senior Consultant $243 
Associate Principal Engineer/Scientist $273 
Principal Engineer/Scientist $273 
Senior Principal Engineer/Scientist $273 
1. Rates above include fringe benefits, burden, and fee. Rates are typically subject to annual increases. 
2. Pre-trial conferences, depositions, mediations, and expert testimony will be billed at one and one-half (1.5) times 
the rates above. 
3. Work requiring out-of-town overnight stays will be billed at eight (8) hours minimum per day. 
4. Direct non-salary project-related expenses, including subcontractors, will be billed at cost plus fifteen (15) percent. 
5. General project-related expenses such as smartphones (including mobile app fees); data and cybersecurity; in-
house reproduction; mail and hard-copy document delivery; and long-term electronic and paper document storage 
will be billed as a general communication fee at a rate of three (3) percent of the labor charges. 
6. Based on client need or request, retired GZA Principals or other individual subconsultants may be retained to 
perform project work.  In these cases, the billing rate for these individuals will be the appropriate rate listed above. 
7. Employee vehicle use will be billed at Internal Revenue Service (IRS) allowed mileage rates. 
8. Project and fieldwork-related equipment use will be billed as cost + 15%. 
9. For projects involving access to hosted online data hubs (ArcGIS, EQuIS, and others) or high-resolution digital 
imagery, additional software hosting fees may apply and will be calculated as cost + 15%.  Fees for staff involved in 
hosted online data hubs or high-resolution digital imagery will be based on equivalent classifications listed in the 
above table. 

Page 406

www.edmstudiocreates.com  |  860 866 6092
HOURLY RATES
ARCHITECTURE
Principal $230.00 per hour
Architect IV $210.00 per hour
Architect III $190.00 per hour
Architect II $170.00 per hour
Architect I $150.00 per hour
Designer IV $190.00 per hour
Designer III $170.00 per hour
Designer II $150.00 per hour
Designer I $125.00 per hour
INTERIOR DESIGN
Interior Designer II $150.00 per hour
Interior Designer I $125.00 per hour
PROJECT MANAGEMENT
Project Manager III $190.00 per hour
Project Manager II $170.00 per hour
Project Manager I $150.00 per hour
GENERAL
Marketing II $150.00 per hour
Marketing I $125.00 per hour
Support Staff $80.00 per hour
REIMBURSABLES
Reproductions and Shipping Cost plus 15%
Consultants and Technical Support Cost plus 15%
Transportation, Meals, and Lodging Cost plus 15%
Auto Mileage per IRS allowance
Rates effective through December 31, 2026
Invoices for services are presented monthly. Accounts over 30 days are subject to a finance change of 1.5% per 
month on unpaid balances.

Page 407

Diversified Structural and Civil Engineering Services   
 
  
  
  
  
2026 SCHEDULE OF FEES 
FOR  
PROFESSIONAL ENGINEERING SERVICES RENDERED   
  
  
  
HOURLY BASIS  
  
 
Principal $240.00 
 
Project Manager $195.00 
 
Senior Engineer $175.00 
 
Engineer $150.00 
 
CAD Operator $115.00 
 
Technician $115.00 
 
Construction Inspector $145.00 
 
               
                                             
MACCHI ENGINEERS, LLC    

Page 408

Hourly Rates
  Position Hourly Rates for Services Rendered
  Principal in Charge $345/hr
  Associate/Team Leader $315/hr
  Project Manager $290/hr
  Senior Engineer $260/hr
  Engineer $230/hr
  Senior Engineering Designer $185/hr
  Engineering Designer $165/hr
  Draftsperson $145/hr
  Clerical/Secretarial $110/hr

Page 409

Proposal for 
Professional Engineering Services
Google Map Data ©2026

Page 410

1
Proposal for
Professional Engineering 
Services
    7.24.2026
Contact
Gregory J. Levasseur, P.E. 
Vice President,              
Windsor Office Director  
H2M Architects & Engineers, Inc. 
360 Bloomfield Avenue 
Suite 406 
Windsor, CT 06095 
   860.607.9011 ext.1034
   973.334.0507 
 
   glevasseur@h2m.com 
Table of Contents
 → Cover Letter
 → TAB 1  ► Project Understanding & Approach
 → TAB 2  ► Firm Qualifications & Experience
 ► References
 → TAB 3  ► Staffing Plan & Resumes
 → TAB 4  ► Appendix A - Cost Proposal

Page 411

 
H2M Architects, Engineers, Geology, Land Surveying and Landscape Architecture, DPC (NY) offers its services in NY only 
H2M Architects & Engineers, Inc. (NJ) offers its services in NJ, DE, CT, FL, LA, MA, PA, RI, SC, and VA only 
H2M Associates, Inc. (NJ) offers its engineering, land surveying, landscape architecture services in NJ only 
H2M will provide appropriately licensed staff for this project - see Staffing Plan for details.                 h2m.com 
July 22, 2026 
 
Mike Walsh, Town Manager 
Town of Granby 
15 North Granby Road 
Granby, CT 06035 
 
RE: Proposal for Professional Engineering Services  
 
Dear Mr. Walsh: 
 
H2M Architects & Engineers, Inc. (H2M) is pleased to submit our proposal and approach to providing 
professional engineering services to the Town of Granby for the planning, design, and construction of a 
replacement athletic/running track and adjacent baseball and softball fields at the Granby High 
School/Middle School complex, as well as on-call engineering services in support of the Town's capital 
improvement and infrastructure initiatives, including new restroom, pickleball courts, and sewer pump 
station improvements. 
 
Building local communities since 1933, H2M has extensive experience planning and designing athletic 
fields and courts, park facilities, and supporting infrastructure for municipal and educational clients. Our 
portfolio includes numerous athletic facility projects, park improvements, utility infrastructure upgrades, 
drainage and site development projects, and municipal capital improvements that demonstrate our ability 
to deliver coordinated, cost-effective solutions while meeting regulatory, budgetary, and scheduling 
requirements. H2M has carefully crafted a team that is familiar with designing projects of this size and 
scope.  
 
I will serve as Principal-in-Charge and primary client liaison, with authority to commit firm resources to this 
project. One of the benefits of H2M is our ability to act as a one-stop shop providing multi-disciplinary 
services, including civil, mechanical, electrical, plumbing, water, and wastewater engineering and 
architecture. To support the various capital improvements the Town plans to undertake, we have proposed 
three Project Managers – Matthew R. Mohlin, P.E., for civil engineering assignments; Anthony W. Kim, 
P.E., for electrical engineering tasks; and Nicholas F. Bono, P.E. (NY) for sewer pump station 
improvements. Qualifications for Mr. Mohlin, Mr. Kim, and Mr. Bono can be found in Tab 3.  
 
The work for this project will be conducted from H2M’s Windsor, CT, office, which is located 13 miles from 
the Town of Granby and 17 miles from the school complex. Our proximity lends the Town the benefit of a 
team that can access the project site easily and meet with project stakeholders. 
 
Having successfully delivered a wide range of municipal civil engineering and athletic facility improvement 
projects for a variety of clients, the H2M team has the requisite skills, multidisciplinary expertise, and 
resources needed to successfully complete the projects and provide the on-call engineering services 
envisioned by the Town. We appreciate the opportunity to be considered for this important project. Should 
you have any questions or concerns, please feel free to contact me at (860) 607-9011 ext. 1034 or email 
me at glevasseur@h2m.com.   
 
Very truly yours, 
H2M Architects & Engineers, Inc. 
 
 
Gregory J. Levasseur, P.E. 
Vice President, Windsor Office Director 

Page 412

 
 
TAB 1 

Page 413

1
Project Understanding
H2M is pleased to provide this proposal to the Town of 
Granby for on-call multi-discipline engineering services.  
H2M is an award-winning, full-service consulting firm 
specializing in the fields of engineering, architecture, land 
use planning, environmental planning, and permitting and 
other related technical fields. Our proposal includes our 
qualifications, project experience, personnel resumes, 
and our understanding of the technical scope of services 
to highlight how our project approach can meet the Town’s 
specific requirements. In addition, we have included our 
approach on value-added engineering to assist the Town with 
any engineering or architectural assignment.
H2M understands work may include the following:
• Construction of a replacement athletic field/running track 
and adjacent baseball and softball fields at the high 
school and middle school complex.
• Construction of a year-round bathroom at Salmon  
Brook Park.
• Construction of pickleball courts at Salmon Brook Park.
• Assessment and administration of a sewer pump 
maintenance project.
• Other civil engineering tasks associated with a 
municipality and its capital infrastructure.
Kings Park Central School District HS Athletic Field Upgrades &     
Comfort Station
We have been providing services to municipalities since 
1933 and are fully staffed with civil, electrical, environmental, 
mechanical, structural, plumbing, water supply, and 
wastewater engineers, as well as architects, GIS staff, and 
construction inspectors.  With a diversified staff of over 600 
people, we are confident in our ability to bring excellent value 
to the Town for these projects and any type of professional 
engineering/architectural services you may require. Since we 
are a full-service firm, we have the experience, technical staff, 
and resources necessary to provide you with the specialized 
services identified in the RFP.
Although we are not proposing to offer land surveying, 
geotechnical engineering or traffic engineering on standalone 
assignments, we have professional relationships with 
surveyors, geotechnical engineers, and traffic engineers as 
well as a network of 275+ subconsultants and subcontractors 
if needed to support other services
H2M manages many on-call contracts with municipalities 
and public agencies, and we understand the importance 
of having staff from all our disciplines available to work on 
projects, as necessary. We have provided similar services 
to those listed above to numerous municipalities. H2M will 
provide experienced staff selected by Principal-in-Charge,  
Gregory J. Levasseur, P.E., based upon their expertise and 
the specific needs of the project assigned. Project Managers 
will be responsible for the day-to-day oversight and execution 
of the projects, project performance, and the direction of the 
technical staff assigned. Additional information regarding 
Mr. Levasseur and our Project Managers for anticipated 
assignments is included in Tab 3.
Proposed Methodology
We recognize that the exact nature of assignments required 
by the Town will vary. When our services are requested, we 
will meet with Town staff to discuss the project scope.  After 
identifying the desired scope, we will prepare a project-
specific proposal for the assignment for the Town’s review.  
If any changes are desired, the proposal can be modified to 
further customize our approach and execution of the project, 
which could also include modifications to address timeframe 
and cost. With an authorization to proceed, we will have a 
mutual agreement on the services to be rendered. While it 
is impossible to describe all of our project approaches, we 
highlighted several below that may be relevant to this contract.
 ► Capital Project Assignments 
Scope Phase
The specific approach for each assignment under this 
contract will be dictated by the scope and complexity of the 
assignment. We will follow the applicable procedures that 
have already been established by the Town and incorporate 
them into our procedures. Regardless of the work, an 
important aspect of every project is the establishment of a 
proper scope. The scope phase is crucial as it defines the 
new construction or facility repair/rehabilitation/improvement 
needs and the work to be undertaken by the consultant.
H2M is committed to Town initiatives and objectives and will 
provide the consistent and regular attention necessary to 
every phase of the project. During the Pre-Design, Schematic 
and Design Development phases, H2M will identify and refine 
project components, creating a living set of documents that 
satisfy the project requirements by:
 ► Project Understanding & Approach

Page 414

2
• Consulting with the Town to ascertain its requirements 
concerning proposed capital improvement work, while 
implementing and conforming the scope to meet any new 
rules/regulations, as well as establish projects or group 
projects to maximize cost savings.
• Reviewing all archived as-built information and prior 
projects recorded at the Town.
• Conducting project kickoff meeting with facility staff, Town 
design team, and other required representatives.
• Interview key facility staff and personnel to further 
delineate needs and define the work scope.
• Visiting the site to inspect, investigate, measure, and 
evaluate existing conditions and related amenities. An 
investigation of the existing conditions will be included in 
an “existing conditions report”, if needed.
• Confirming history of modifications and corrective work 
performed if it is known.
• Confirming current problems the personnel experience 
with the operation of the facility.
• Confirming current applicable maintenance procedures, 
and determine if the staff has additional as-built 
information on site.
• Creating probe and testing documentation to aid in the 
definition of the project scope and construction cost.
• Developing preliminary drawings and construction  
cost opinions.
• Preparing and reviewing alternate approaches for the 
design and construction project and the cost associated 
with such alternative approaches.
• Evaluating critical issues and costs to determine the most 
value-engineered design.
• Prioritizing the capital improvement work to be performed, 
considering both the projected long-term needs of the 
Town, their standards, other County, State, or Federal 
agency approvals, and the protection and safety of the 
facilities and their occupants.
• Developing a preliminary timeline for construction and 
completion of work for use and occupancy by the Town.
Upon gaining an understanding of the project and site-
specific issues, we will conduct a site visit with the Town 
Project Manager prior to initiating the work.  We will then 
meet internally with our project design team to establish clear 
guidelines relative to the successful completion of the project.  
An internal Project Plan will be prepared that will identify the 
following information: 
• Liaison with Town Project Manager 
• Project Team Members
• Critical Project Design Issues
• Required Regulatory Approvals
• Construction Budget
• H2M Project Team Budget
• Project Schedule and Critical Milestones
• Meetings with the Town
• Internal Meetings and Scheduled QA/QC Reviews
• Contract Plan and Specification Guidelines
We will obtain and review existing available information 
and record documents of the project site/facility and make 
initial contacts with utility companies and potential permitting 
agencies.  During this task, we will make the necessary 
arrangements to perform several soil borings and pavement 
cores in the field to assist us in the proper design if required.  
These geotechnical related services would be provided as a 
reimbursable expense.
Town of Clarkstown Wastewater Pump Station Improvements
Preparing a Draft Scope Report for the Town’s Review  
& Comment
Regardless of the assignment, an important aspect of 
every project is the establishment of a proper program. The 
Program Phase is probably the most important aspect of the 
project as it defines the client’s new construction or facility 
repair/rehabilitation/improvement needs and the work to be 
undertaken by the consultant.
H2M’s role will be to clarify the scope of work, identify design 
options, construction implications and the associated costs, 
and communicate these findings and recommendations. As 
part of this role, it is H2M’s responsibility to bring value to 
the project by identifying cost-saving options, where viable, 
and exploring different ways to achieve the project objective. 
Often items not originally envisioned may be recommended 
for inclusion in a project to provide a more complete solution 
or to minimize the cost of remobilizing under a separate 
future project. To develop viable options and a successful 
design solution, it is critical that we first develop a thorough 
understanding of the client’s needs.
At the commencement of each project, our team will meet with 
and conduct a site visit with appropriate Town staff to assess 
 ► Project Understanding & Approach

Page 415

3
and document field conditions and develop the project scope. 
At this time, as-built drawings and data will be requested from 
the Town and reviewed. 
Preparing Preliminary Concept Designs
H2M has the depth of experience and expertise to prepare 
preliminary concept designs for any project assigned. 
Whether they be ongoing or new proposed developments, 
we will address the status and/or the conceptual basis for 
the renovations to new facilities, ADA upgrades, structural 
modifications to and assessment of existing facilities, 
rehabilitation and replacement of building elements and 
systems, services to historic structures or any other projects. 
The on-call services can be executed competently, effectively 
and in a timely fashion by our in-house staff of design 
engineers and architects, who can prepare presentations of 
any kind to satisfy the requests of the Town.
As design professionals, H2M strives to listen, assist, guide, 
and recommend solutions for our clients in all aspects of 
architecture and engineering. We have a long history of 
working with our clients to develop the best solutions for their 
facility needs within their budgets. Our success in developing 
the best solutions comes from our ability to design projects 
using input directly from those that manage the facility. End 
users also contribute to the design process, so the final 
product is one that works for the facility personnel and end 
users, as well as it being visually appealing, organized, well-
constructed, efficient, and economical.
An important issue we understand through our experiences 
with this type of work is assisting in the management of a 
successful relationship between the Town Project Manager 
and the personnel at the projects. H2M recognizes that the 
project scope must always be defined through the Town’s 
guidelines and Project Manager, and that changes in scope 
cannot be made at the request of the facility personnel 
without authorization by the Town design team and project 
manager. Our management and technical staff are trained 
to work with facility personnel and obtain the project-specific 
information necessary to have a successful project. We 
channel the information through the proper protocols so it can 
be implemented and utilized appropriately and effectively in 
the project’s design.
H2M will prepare preliminary plans and an updated construction 
cost opinion and identify any special specifications required.  
The preliminary plans will incorporate the elements initially 
identified at the kickoff meeting as well as subsequent 
meetings with Town.  These plans will be submitted for Town 
review and will then be discussed with the Town prior to 
advancing the plans to contract documents. 
Design Phase/Construction Document Phase
As a full-service firm, having all necessary supporting 
disciplines under one roof allows us to complete documents 
quickly and efficiently, with a single source of responsibility.
Following the approval of the preliminary plans by Town, 
H2M will commence with the preparation of the final design, 
including the production of various documents necessary 
for construction and permitting. During this phase, we will 
meet with the Town to make final equipment and material 
selections where required. During these meetings, we will 
also obtain input from the Town regarding phasing of the 
project (if applicable) and contractor staging areas and haul 
routes, to minimize disruption to the adjoining and nearby 
properties. Our plans will be developed in accordance with 
Town, State and other local standards; International Building 
Code; International Energy Conservation Code; County 
agency requirements; and all applicable building construction, 
fire protection, and ADA/ANSI standard regulations. These 
construction drawings will be coordinated with all support 
disciplines. H2M will submit the contract documents for 
review and comment at the 30%, 60% and 90% milestones.  
As part of the contract documents, electronic specifications 
will be prepared using the Construction Specification Institute 
(CSI) MasterFormat™ 2004 edition. Each submission to the 
Town will include a detailed cost opinion updated as the level 
of detail in the construction documents evolves.  If, at any 
time, the cost opinion exceeds the funding set aside for this 
project, we will advise the Town, so that proper arrangements 
can be made to address this issue.  These arrangements may 
include increasing funding or modifying the scope of work to 
ensure sufficient funding is available.
After acceptance of the final documents, H2M will submit the 
final contract documents to the Town. This submission will 
include all deliverables as outlined in scope of services, as 
well as the final cost opinion and schedule.
Bid Phase Support
At the Town’s request, H2M can direct the bid phase of a 
project and comply with the Town bidding procedures.  Upon 
receipt of permit approvals, H2M can:
• Produce drawings and specification books. 
• Respond to questions during the bidding process. 
• Attend pre-bid walk through. 
• Prepare any addenda required for clarification purposes. 
• Review received proposals for accuracy, completeness, 
and compliance to surety requirements and feasibility 
with regard to available economic resources. 
• Record results of the bid proposal meeting and prepare 
a report summarizing the bidding results and offering 
recommendations to Town. 
• Assist the Town with vetting the lowest qualified  
bidder using our experience to assess and verify the 
contractor’s qualifications.
• Confirm all necessary documents for contract signing 
and preparation of a notice to proceed.
 
 ► Project Understanding & Approach

Page 416

4
Town of Groton Downtown Mystic Drainage Improvements
 ► Construction Phase Assignments 
Construction Administration
While we take great pride in the quality of our plans and 
specifications, we recognize they are not the final product. The 
completed construction is the final product that the Town will 
inhabit and use for many years. We keep the original design 
team involved during construction. This gives direct feedback 
on their designs and instills a sense of ownership. Our 
Project Manager remains an integral part of the construction 
administration phase, bringing valuable experience in scope 
and design forward into construction.  The key personnel 
are assigned to be available either on an as needed or 
resident basis for inspections and to provide technical review 
and general guidance to the Town. H2M’s staff is available 
during the construction phase to support and assist the Town 
by providing the following services, which have previously 
proven to be the basis for successful construction projects.
During the construction phase of a project, H2M will maintain 
consistent involvement in the project on behalf of the Town.  
The key personnel assigned will be available either to provide 
technical advisement or general guidance to the Town. We 
will be available during the construction phase to support and 
assist the Town by providing the following services, which 
have proven to be part of the basis for previously successful 
construction projects: 
• Attend a pre-construction conference and outline certain 
basic expectations placed on the contractor. 
• Observe the contractor’s construction activities and 
progress and compilation of detailed inspection reports. 
• Review the contractors’ submittals for compliance to 
requirements such as progress schedule; schedule 
of values; subcontractor listing; insurance certificates; 
bonding surety certificates; and contractor references. 
• Review shop drawings and technical data submittals for 
compliance to the contract provisions. 
• Review contractor’s payment requisitions to scheduled 
values and actual observed progress. 
• Review contractor change order requests and negotiate 
acceptable fees.
• Perform weekly inspections while work is in progress and 
as necessary to resolve critical design issues in the field. 
• Conduct weekly progress meetings with the contractors 
and Town representatives to discuss issues related to 
the design, progress of work, and quality of the work and 
timely completion of the work.  Prepare and distribute 
meeting minutes. 
• Availability to respond rapidly to encountered field 
conditions, and to provide technical advisement as 
necessary to develop practical solutions to problems.
• Respond to surety inquiries. 
• Prepare punch lists for completion of work by contractors. 
• Review final closeout paperwork submitted by the 
contractor and execute such paperwork. 
• If requested by Town, H2M will be available to provide 
additional consultation/inspection and recommendations 
regarding warranted action during the one-year 
maintenance period.  If requested, H2M can assist in 
the preparation of as-built drawings and coordination 
to ensure the compatibility and incorporation of the 
documents into the Town’s GIS system. 
Construction Inspection
During construction, H2M can provide quality control in the 
field by providing full- or part-time construction inspection 
services for the oversight of work performed by the contractor 
as requested by the Town.
Some Key Elements of our Approach
Working with Town Personnel
As design professionals, H2M strives to listen, assist, guide, 
and recommend solutions for our clients in all aspects of 
engineering. We have a long history of working with our clients 
to develop the best solutions for their facility needs within their 
budgets. One of the ways we succeed in developing the best 
solutions is through our ability to design projects using input 
directly from the end-users and those that manage the facility. 
We will partner with the Town during the design process, 
so the final product is effective for all involved while also  
being visually appealing, organized, well-constructed, 
efficient, and economical.
An important factor that we understand through our experience 
with this type of work is assisting in the management of a 
successful relationship with the personnel at the Town facility 
where the work is being conducted.
Our management and technical staff are trained in how to work 
with Town personnel to obtain the project-specific information 
required to successfully complete any task. We also train on 
how to channel that information through the proper protocols 
Google Map Data ©2025
 ► Project Understanding & Approach

Page 417

5
so that it can be implemented and utilized appropriately and 
effectively in the project’s design.
Point of Contact
We understand that the Town’s project manager must have 
a point of contact within H2M who can field questions and 
respond to requests in a timely manner. The Town’s project 
manager should feel like H2M’s entire staff, and the staff of 
our entire project team is a resource available to him or her, 
which can simply be accessed by picking up the phone and 
directly calling our Principal-in-Charge or Project Manager.  
Regardless of the size or scope of the project, the Town will 
be able to work with our staff as if they were an in-house 
design team or technical resource located within the same 
office. The Town’s project manager and senior construction 
specialist will be given the contact information of key staff, 
project leaders, and management team so they can be 
reached at any time.
Quality of Construction
It is crucial for any professional engineer to understand the 
quality of construction, so that the end product is one that 
fits the needs and requirements of the client. In some cases, 
quality may mean a particular product or material. Quality 
does not necessarily have to mean expensive, because with 
proper planning and/or design, quality may be achieved just 
by making a design simpler or less complicated. Obtaining 
the level of project quality that a client desires is a process, 
one with which we are experienced in assisting. During the 
project programming process within the Schematic Design 
Phase, we seek to determine the levels of quality expected by 
the client so that this information can be incorporated into the 
design. In the Construction Document Design Development 
Phase, we further propose options and selections to the 
client (again seeking input from the end-users and facility 
managers) to see that the level of quality being proposed is 
one that is desired.
Our more than years of experience allows us to provide insight 
and suggestions to the client, and often we take our clients to 
visit our completed projects so that they can see an example 
of what is available firsthand and decide on exactly what they 
want. It is important for a client to understand what they are 
receiving; what level of quality is being described and what 
is being designed. We have a long history of working with 
our clients to develop solutions, so that the final product suits 
their needs and is of the quality they desire.
Technology Tools
H2M’s staff is proficient with using both Building Information 
Modeling (BIM), in the form of REVIT, as well as AutoCad 
Civil 3D to create construction documents. Additionally, 
technical specifications can be generated using Spec-link E 
software. The specifications will be updated and tailored to 
fit the project specifics and will be modified continuously with 
respect to the most current codes and references.
Village of Patchogue Sanitary Sewer Design 
Communication & Coordination
One of our top priorities in every project is ensuring that there is 
clear and proper communication throughout. Communication 
is not just about talking and providing adequate documentation 
but also includes listening and making sure that any 
information communicated is received and understood. 
Communication between all team members — the owner, 
the design professional, and their subcontractors, regulatory 
agencies having jurisdiction, and general contractor to name 
a few — is paramount to a project’s success. Everyone needs 
to communicate, as everyone becomes part of the project 
team and has an important role that cannot be fulfilled without 
proper communication. At the beginning of every project at 
H2M, our Project Manager develops a comprehensive Project 
Plan that defines the project scope, the client’s needs and 
expectations, staffing needs, schedule, budget, applicable 
codes, potential problems, team member roles and lines of 
communication. The Project Plan provides a road map for the 
members of the project team and is a living document that is 
updated as the work progresses. The Project Plan is used 
as the agenda for the project kickoff meeting and progress 
meetings throughout the design phase of the project.
Project coordination is critical to a project and requires strong 
lines of communication. In the specialized world we live in, there 
are many features that get designed into a facility, and each 
feature requires coordination between multiple disciplines 
(architecture and engineering, or one engineering discipline 
with another). Each team member needs to understand the 
work they need to coordinate with another team member and 
the information they need to pass on so the work can be done 
efficiently and effectively. The team proposed for this contract 
is experienced in working together on similar projects and 
knows how to coordinate all of the features that are expected 
to be part of the project types outlined in the RFP. The team 
knows how to communicate with one another, and they work 
together project after project.
 ► Project Understanding & Approach

Page 418

6
Over the years we have developed procedures which include 
checklists, standard details, coordinated meetings, and 
assignments of responsibilities for each discipline to ensure 
the work is done properly. We pride ourselves on our well-
coordinated, well-executed construction documents.
Project Management Software
H2M provides engineering services on a wide variety of project 
types. H2M utilizes a project information management system 
(Newforma) to facilitate our staff’s ability to file and manage 
project information. The primary benefits of Newforma are 
more efficient document management and retrieval, email 
management, and construction contract administration.
All project emails, meeting minutes, correspondence, project 
photos, plans, specifications, etc. are saved to the project 
through Newforma and electronically stored on our network. 
Action items can be assigned to project team members, 
including external team members from the Town and 
contractors, and their status tracked through an automated 
logging system. Shop drawings are transmitted electronically, 
and their status tracked through an automated logging 
system as well as requests for information (RFIs), change 
order proposals, supplemental sketches, daily reports, and 
other construction related activities. Action items can also 
be incorporated into meeting minutes and carried over as 
required into future meeting minute agendas.
Shared folders can also be created to allow access by all team 
members to share important project information throughout 
the life of the project. Submittal, RFI, and all other logs are 
automatically created, and all project information is easily 
transmitted and stored electronically with easy access by our 
clients, subconsultants, and contractors. We have found this 
to be a great tool for our staff, our clients, and contractors 
while managing projects during design and construction. H2M 
utilizes BST Project Management software to track all project 
financial information. This helps our staff ensure that they 
perform their required assignments within the client’s budget. 
The BST system is also used as a resource management tool 
which allows department managers and project managers to 
schedule staff based on their projected workload.
Cost Control
Designing a project to stay within the client’s construction 
budget requires discipline and an awareness of the impact of 
design decisions and scope changes throughout the design 
phase. Cost opinions need to be updated at each design 
milestone, and an awareness of the construction bidding 
climate is imperative to developing accurate cost opinions. 
All of our staff are aware of the importance of designing to 
the project’s budget and we have been very successful at 
keeping projects within budget for our clients. We typically 
initiate various cost control procedures throughout each 
project, including:
• Prepare budget estimates at three critical project 
intervals: Schematic Design, Design Development, and 
Construction Documents phases.
• Review constructability of the systems details during 
project development. This enables us to review the 
design/cost relationship to verify adherence to the overall 
budget and program.
• Evaluate the relative cost of systems and product 
throughout design and construction. All information is 
maintained on a computer network for the project team 
to access and review regularly.
• Assist the owner in evaluating cost proposals from the 
contractors throughout the bidding and construction phases.
• Develop bid alternatives that maximize value without 
compromising quality.
Closing
H2M’s philosophy in dealing with challenges is through 
proactive, clear, and frequent communication with the Town’s 
Project Manager. With this approach, complexities and 
challenges can be addressed head-on and in a timely fashion.  
We have assembled a highly experienced team to work with 
the Town of Granby on this project. We are confident in the 
capabilities of our team in working through project issues 
as they occur. H2M also believes in teaming with the Town 
as a valuable participant in the project and process. We will 
value your input, feedback, and comments. We look forward 
to closely working together with the Town on this on-call 
consulting engineering services contract.
 ► Project Understanding & Approach

Page 419

 
 
TAB 2 

Page 420

1
Here at H2M, we value people.
OPERATING PHILOSOPHY
M
I
S
S
I
O
N
Our People
We commit to developing our people and 
rewarding hard work with growth opportunities 
in an inclusive professional environment.
Our Clients
We commit to being trusted advisors for our 
clients and delivering problem solving value and 
quality on every project.
Our Communities
We commit to creating thriving and healthy 
communities by giving of ourselves and developing 
sustainable solutions that benefit everyone.
V
I
S
I
O
N
We exist to improve the quality of life for 
everyone in our reach by empowering 
our diverse talent to sustainably solve the 
challenges of the built environment.
V
A
L
U
E
S
We Stand as One H2M
Inclusive. Supportive. Collaborative. 
No matter where you are.
We Challenge One Another
We show up curious and push boundaries.
We Do the Right Thing
Our character is built on doing what 
is right and ethical.
We Work Safely
We care for the lives of our people
and their families.
We Own it
We hold ourselves accountable for team 
success and personal achievement.
We Embrace Diversity
We acknowledge and honor the fundamental 
value and dignity of all individuals.
Practical Approach. Creative Results.
H2M is a multi-disciplined professional consulting and design firm with 
a proud legacy of client service and a proven ability to tackle complex 
engineering, architectural, and environmental challenges. Since 1933, 
we have played a vital role in shaping local communities — designing 
and improving essential infrastructure such as water treatment plants, 
emergency response facilities, schools, roadways, public buildings, 
and more.
With decades of experience, we have built a reputation for delivering high-
quality, client-focused solutions that balance innovation with practicality. 
Our approach is rooted in collaboration, technical excellence, and a 
deep understanding of the communities we serve. Whether navigating 
regulatory complexities, addressing evolving environmental concerns, or 
designing spaces that enhance everyday life, H2M remains committed 
to providing sound judgment, creative problem-solving, and exceptional 
service at every stage of a project.
H2M takes pride in the depth and diversity of our comprehensive  
in-house service capabilities. With a team of more than 600 professionals 
— including engineers, architects, surveyors, scientists, planners, 
landscape architects, inspectors, and technical support specialists — we 
provide a fully integrated, multidisciplinary approach to our clients.
H2M was organized in 1933 and founded on 
the principles of professional excellence, 
hard work, and integrity. 
H2M Staff by Discipline
177 88 76 51
Architecture Water MEP Environmental
29 36 43 22
Construction 
Inspection
Wastewater Civil Structural
7 7 4 3
Planning Land
Surveying
Landscape 
Architecture
GIS

Page 421

H2M Services
• Feasibility/implementation studies
• Energy conservation
• Cost/benefit analysis
• Commissioning/testing
Planning
• Comprehensive master planning
• Parks, open space and recreation planning
• Environmental and natural resource planning
• SEQRA and EIS documentation and process 
support
• Community visioning
• Zoning ordinances and analysis
• Redevelopment studies and plans 
• Geographic Information Systems (GIS)
• Urban design
• Strategic solid waste management planning
• Stormwater management program planning
• FEMA hazard mitigation and resilience planning
• Design guidelines
• Renderings 
• Feasibility studies and conceptual plans 
• Downtown revitalization
• Expert private testimony
• Municipal board representation
Wastewater Engineering
• Characterization/quantification of waste 
• Treatment facility evaluation 
• Scavenger waste facility design
• Outfalls and leaching systems design
• Chemical feed systems design
• Monitoring and control systems
• Nutrient removal treatment systems design 
• Facility planning studies
• Wastewater treatment studies
• Wastewater treatment plant design
• Wastewater reuse design
• Standby power systems
• Sludge thickening, dewatering
• Sludge treatment, disposal
• Odor control
• UV and chemical disinfection systems
• Sewer system extension planning
• User cost analysis
• Sanitary sewer design
• Sewer rehabilitation studies and design
• Infiltration/Inflow evaluation
• Pump station evaluations and design
• Sewer flow modeling
• Security systems
• Geographic Information Systems (GIS)
• Discharge monitoring reports
• Plant performance monitoring
• Preparation of O&M manuals
• Facility start-up and operations
• Groundwater/effluent monitoring programs
• Operator training
• Industrial pretreatment programs
• Prepare/revise sewer use ordinance
Water Engineering
• Supply well design
• Plant rehabilitation design
• Water treatment systems
• Water filtration systems design
• VOC removal treatment systems design
• Distribution system analysis and design
• Distribution hydraulic modeling
• Automated mapping/facilities mapping
• Storage tank rehabilitation/repainting
• Storage tank design
• Tank and coatings inspection
• Instrumentation and computer control designs
• Comprehensive groundwater modeling
• Geographic Information Systems (GIS)
• Aquatics and park design
• Public swimming pool design
• O&M programs
• Training programs
• Asset management
• Solid waste management facility design
• Solid waste facility operational assessments 
Waste and materials quantification and 
characterization analysis
• NYSDEC Part 360 regulatory compliance and 
permitting
• Remedial investigations/feasibility studies
• Risk assessments
• Above and underground tank management
• Soil and groundwater remediation
• Soil vapor intrusion studies
• Regulatory compliance programs
• Industrial hygiene
• Indoor air quality
• CM/LBP/mold inspections and abatement
• Computer modeling
• Asbestos investigation and removal
• Geographic Information Systems (GIS)
Land Surveying
• Boundary and title surveys
• Topographical surveys
• Horizontal and vertical control surveys
• Hydrographic surveys
• Route surveys
• Subdivision planning
• Sanitary and drainage study maps
• Legal descriptions
• Construction layout services
• As-built surveys
• Architectural surveys
• Structural surveys
• Under-construction inspection surveys
• Easement survey and description
Landscape Architecture
• Tree inventory and assessment
• Tree mitigation
• Landscape design and restoration
• Conceptual site design 
• Landscape planning
• Illustrative renderings 
• Landscape architectural detailing
• Streetscape and urban design 
• Parks and playgrounds design
• Campus landscape design
• Private estate and residential design
• Planting design 
• Wetlands mitigation
• Green infrastructure
MEP Engineering
• Electrical systems design
• Feasibility and implementation studies
• Power supply
• Exterior and interior building services
• Closed-circuit television security systems
• Emergency power generation
• Site/systems and load evaluations
• Energy studies
• Site lighting design
• Fire and security systems
• SCADA systems
• Utility company rebates and incentives
• HVAC systems design
• Heat and cooling load analysis
• Steam systems
• Hydronics
• Heat recovery systems
• Chillers and cooling towers
• Laboratory ventilation systems
• Site/systems evaluations
Architecture 
• Architectural design
• Comprehensive grant programs
• LEED design processes
• Interior design
• Removal of barriers to the handicapped
• Master plans and revisions
• Needs assessments
• Planning studies
• Building conditions surveys
• Restoration of historic structures
• Restaurant and kitchen design
• Zoning ordinance review
• Educational facilities design
• Assisted living facilities design
Civil/Site & Structural Engineering
• Roadway reconstruction and resurfacing
• Site plan design
• Street lighting
• Flood control and drainage
• Irrigation systems
• Sidewalks and curbs
• Storm drainage systems
• Water mains
• Local roadway study and design
• Subdivision design
• Streetscape design and improvements
• Parks, playgrounds, athletic fields
• Parking fields
• Highway planning studies
• Intersection design and improvements
• Visual impact analyses
• Geographic Information Systems (GIS)
• Green infrastructure design
• Structural conditions assessments
• Structural building design
• Structural renovations/alterations
• Cause and origin investigations
• Retaining walls, bulkhead, and culvert design
• Storm hardening/resiliency
• Expert testimony
Construction Phase Services
• Construction management/administration
• Resident engineering
• Construction inspection (F/T or P/T)
• Daily/weekly/monthly project reporting
• Utility coordination
• Weekly job progress meetings/minutes
• Schedule review
• Change order processing
• Payment requisition processing
• Project startup
• Commissioning
• Prepare punch list
• Project closeout
• Record drawings
Environmental Engineering & Sciences
• Air and water pollution control
• Hazardous waste management
• Hazardous materials storage design
• Waste minimization
• Environmental Impact Statements (EISs)
• Wetland delineation
• Environmental Site Assessments (ESAs)
• Environmental compliance audits
• Environmental permitting
• Site investigations
• Brownfield assessments
22
H2M Services
Capabilities do not apply to all states in which we do business.

Page 422

33
H2M Offices
WINDSOR
13 & 17 
miles
Distance from our Windsor, CT office
to the Town and school complex, respectively H2M Office Locations | Connecticut Office
“H2M” refers to H2M Architects, Engineers, Geology, Land Surveying and Landscape Architecture, D.P.C. and/or its subsidiary H2M Associates, Inc., and/or its affiliate H2M 
Architects & Engineers, Inc., as appropriate to the context.  Each company’s professional resources are available to the others to the maximum extent permitted by applicable state 
laws.  H2M will not practice, and should not be interpreted to be offering to practice, any professional service for which it and its cognizant employees are not properly licensed.
H2M Architects, Engineers, Geology, Land Surveying and Landscape Architecture, DPC (dba: H2M architects + engineers) is a NYS Design Professional Corporation.  It maintains New 
York Certificates of Authorization to provide professional architecture, engineering, geology, land surveying, and landscape architecture services.
H2M Associates, Inc. is a New Jersey business corporation. It is a wholly owned subsidiary of the parent company. It maintains New Jersey Certificates of Authorization to provide 
professional engineering, land surveying, and landscape architecture services.
H2M Architects & Engineers, Inc. is a New Jersey business corporation. It is an affiliate of the parent company, being under the ownership and control of a group of appropriately licensed 
officers of the parent company. It maintains New Jersey Certificates of Authorization to provide architecture and professional engineering services. It is also appropriately structured to 
maintain certificates of authority to provide architecture and professional engineering services in Connecticut, Delaware, Florida, Louisiana, Massachusetts, Pennsylvania, Rhode Island, 
South Carolina, and Virginia.
538 Broad Hollow Road, 4th Floor East, Melville, NY 11747
230 West 38th Street, 14th Floor, New York, NY 10018
737 Roanoke Avenue, Riverhead, NY 11701
2 Executive Boulevard, Suite 401, Suffern, NY 10901
1133 Westchester Avenue, Suite N-210, White Plains, NY 10605
433 River Street, Suite 8002 ,Troy, NY 12180
351 S. Warren Street, 2nd Floor, Syracuse, NY 13202
1639 Route 10, Suite 101, Parsippany, NJ 07054
4810 Belmar Boulevard, Wall Township, NJ 07753
287 Grove Street, Building D, Suite 204, Worcester, MA 01605 
360 Bloomfield Avenue, Suite 406, Windsor, CT 06095
10 Dorrance Street, Suite 700, Providence, RI 02903 
301 Grant Street, Suite 270, Pittsburgh, PA 15219
1650 Market Street, Suite 3600, Philadelphia, PA 19103 
1000 North West Street, Suite 1200, Wilmington, DE 19801
951 Yamato Road, Suite 202, Boca Raton, FL 33431
333 SE 2nd Avenue, Miami, FL 33131
100 S. Ashley Drive, Tampa, FL 33602

Page 423

4
Core of Excellence
Core of Excellence
The Core of Excellence is an H2M exclusive initiative that sets us apart from the competition with a focus on excellence and quality 
as a core element of our services. It's a firm-wide commitment to deliver excellence through innovative and best-in-class service to 
our clients, colleagues, and ourselves. H2M's Core of Excellence is comprised of five key components:
QA/QC
We demonstrate our commitment to ensuring 
quality at the corporate level through 
our appointment of a full-time Director of 
Corporate QA/QC to lead the development, 
implementation, and oversight of H2M’s 
Quality Management System (QMS). 
This commitment is further reinforced 
by established quality assurance team 
members who, independent of the project 
design team, assure that H2M’s components 
of quality are incorporated. H2M’s QMS is 
comprised of a combination of processes, 
tools and resources available to all H2M staff. 
These include Quality Control Checklists, 
established QA/QC communication 
channels, and templates all made accessible 
thorough H2M’s comprehensive Project 
Management Framework.
SCHEDULING
We recognize the importance of timely 
project delivery and take great pride in our 
ability to quickly mobilize, assign staff, and 
complete projects on time. H2M developed 
a custom scheduling interface allowing for 
consistent data inputs from the entire firm on 
a bi-weekly basis. This is transitioning to a 
centralized scheduling database that allows 
real-time total team scheduling updates and 
awareness, allowing H2M to actively adapt 
our resources to meet the needs of even 
the most demanding project schedules. We 
can share detailed, easy to read graphic 
schedules with our clients, allowing them 
to always have their finger on the pulse of 
their project’s timeline.
SPECIFICATIONS
Our focus and commitment to excellence 
and quality is further reflected in our 
Master CSI-based Specifications Library. A 
dedicated, full-time Specifications Manager 
oversees the continual development, 
standardization, and maintenance of our 
Master Specifications. H2M utilizes a 
cloud-based specification software platform 
that allows all users direct access to our 
Master Specifications Library to develop 
project-specific spec books. This process 
ensures that our project specifications 
include the latest updates in product data 
and reference standards.
BIM/CAD
Building Information Modeling (BIM) has 
revolutionized the A/E/C industry. By using 
intelligent 3-D digital models to generate our 
designs, H2M can achieve a higher level of 
quality, consistency, and efficiency in our 
production process, minimizing the potential 
for change orders during construction. 
We employ a full-time, dedicated, and 
independent team comprised of design 
professionals and BIM-CAD specialists 
whose primary responsibilities are to 
create, deploy, and maintain company-
wide standards, templates, procedures, and 
workflows. Our adoption of BIM has been  
the single most important change in how we 
design and manage our projects.
SAFETY
Safety is essential at H2M. We employ 
a dedicated corporate health and safety 
manager within the Core of Excellence. 
H2M has established mandatory safety 
training and is actively implementing the 
Plan-Do-Check-Act methodology. By 
incorporating safety into our overall quality 
management systems, we ensure that all of 
our staff can get home safely each day and 
that we proactively respond to our clients’ 
health and safety requirements.
CLIENT BENEFITS
  Well-coordinated construction 
documents that reduce project 
change orders and minimize cost 
overruns
  Consistent quality and proven 
performance
  Optimized resource allocation to 
meet project demands
  Increased compliance with the 
latest industry and regulatory 
standards
  Enhanced project visualization 
via 3D modeling
  Improved collaboration among all 
project stakeholders

Page 424

5
 
 
 9 Local Connecticut 
presence
 9 Extensive athletic field/
track expertise
 9 Municipal on-call 
experience
 9 Multi-discipline services 
under one roof
 9 Extensive storm water 
and drainage experience
 9 Ability to support future 
capital projects beyond 
the known assignments
References 
H2M has extensive experience designing athletic fields and providing various 
on-call engineering services. The firm prides itself on building a strong rapport 
with clients, serving them as trusted advisors with sound judgment and creative 
solutions to their unique challenges. We encourage you to contact our references 
below to verify our successful track record.
 ► Town of Groton Downtown Mystic Drainage Improvements
Geoffrey Foster, P.E., Deputy Director of Public Works
860-448-4072
 ► Incorporated Village of Malverne Drainage &  
Athletic Improvements
Timothy Sullivan, Mayor
516-599-1200 
 ► Somers Central School District Athletic Site Upgrades
Christopher Platania, Assistant Superintendent for Business and Operations  
914-277-2410
 ► Westchester County Department of Environmental Facilities 
Pumping Stations Rehabilitation
Vincent F. Kopicki, P.E., Commissioner 
914-995-2546
 ► Town of Newtown Water Distribution System Replacement
Fred Hurley, Director of Public Works 
203-270-4300
 
 ► References

Page 425

19
1
2
3
4
5
6 7
8
9
10
11
12
13
15
16
17
18
20
21
22
23
24
25
26
27
14
28
29
30
31
32
33
34
Carle Place HS - Baseball + Multipurpose Field
East Islip MS - Multipurpose Field
East Islip HS - Baseball + Multipurpose Field
Howitt MS - Baseball, Softball + Multipurpose Field
Louis M. Klein MS - Baseball + Multipurpose Field
Woodmere MS - Multipurpose Field
Hewlett HS - Multipurpose Field
Island Trees HS - Multipurpose Field
Kings Park HS - Multipurpose Field
L.I. Lutheran MS + HS - Multipurpose Field
Howard T. Herber MS - Baseball Field
Massapequa HS - Baseball + Multipurpose Field
Alfred G. Berner MS - Baseball + Multipurpose Field
Newfield HS - Baseball Field
Centereach HS - Baseball Field
Selden MS - Soccer Field
Mount Sinai MS - Multipurpose Field
Smithtown HS West - Multipurpose Field
Smithtown HS East - Multipurpose Field
Walt Whitman HS - Multipurpose Field
Syosset HS - Baseball + Multipurpose Field
Sleepy Hollow HS - Multipurpose Field
Washington Irving Intermediate - Multipurpose Field
Manhasset Valley Park - Baseball + Multipurpose Field
North Hempstead Beach Park - Baseball Field
White Plains HS - Multipurpose Field
Highlands MS - Multipurpose Field
Uniondale HS - Multipurpose Field
John Street ES - Baseball Field
Dominican College - Multipurpose Field
Somers HS - Baseball + Softball Field
Harrison HS - Baseball Field
Baldwin HS - Multipurpose Field
Monsignor McClancy Memorial HS - Multipurpose
Refer to the map, key and corresponding 
list of service areas below to see where 
H2M has designed synthetic turf fields.
Synthetic Turf Fields 
1
2
3
4
5
6
7
8
9
10
11
12
13
14
24
25
26
15
16
17
18
19
20
21
22
23
27
28
29
30
31
32
33
34
6

Page 426

Drainage Improvements • 
Town of Groton
Groton, CT SERVICES  PROVIDED Drainage Analysis Drainage Design
Community Engagement
Permitting
Funding Assistance
Construction Cost: TBD
H2M is providing engineering design services to support drainage improvements in the Downtown Mystic area, specifically along Gravel 
Street and Pearl Street, which are susceptible to coastal and tidal flooding.
The project is driven by recommendations outlined in the Town’s 
resiliency planning efforts and focuses on improving stormwater 
management, mitigating flood risks, and enhancing long-term 
infrastructure performance.
H2M’s scope includes evaluation of existing drainage 
infrastructure, watershed analysis, and development of design 
solutions to address runoff, capacity limitations, and projected 
sea level rise impacts. 
Services include hydrologic and hydraulic modeling and 
preliminary and final engineering design for system upgrades such 
as drainage improvements, tide control measures, and upstream 
detention strategies. The firm is utilizing a subconsultant for land 
surveying services and catch basin cleaning to obtain existing 
drainage system data.
The project also incorporates stakeholder coordination and 
community engagement to obtain input on design decisions, as 
well as preparation of permitting documentation and support for 
environmental approvals. H2M is advancing the project through 
phased design, including preparation of a Basis of Design Report, 
preliminary and final contract documents, and construction cost 
estimates. The project supports the Town’s goals for resiliency, 
regulatory compliance, and protection of critical coastal 
infrastructure.

Page 427

Athletic Field Upgrades • 
Massapequa Union Free 
School District
Massapequa, NY
SERVICES  
PROVIDED
Land Surveying
 Site Engineering
Athletic Field Design 
Stormwater Modeling
Stormwater Pollution 
Prevention Plan
 Electrical Engineering
Construction Cost: $3.5 million
AWARDS
 ♦ ACEC New York - Diamond Award
H2M was selected to design several critical improvements to the existing athletic complex at Massapequa High School.
While the athletic fields at the Massapequa High School Main 
Campus provided an excellent venue for the student-athletes 
and community members to participate in sporting events, the 
Massapequa Union Free School District recognized the need 
to renovate and improve the aging and worn facilities to best 
accommodate the needs and demands of the student-athletes 
and burgeoning Massapequa community.  
H2M was selected to design several critical improvements 
to the existing facility, including adjusting the overall layout, 
incorporating pathways and bleachers to improve accessibility at 
the complex, and converting the original natural grass athletic 
fields to a synthetic turf to allow for more frequent use and reduce 
annual maintenance cost.  
To manage runoff peak flow rate and water quality volume, 
underground stormwater linear leaching chambers were installed 
in lieu of traditional concrete drywells due to shallow groundwater 
conditions.  The series of low-profile, open-bottomed underground 
linear leaching chambers were incorporated to provide runoff 
storage capacity while creating a separation distance between 
the bottom of the chambers and the water table.  
New ADA-compliant walkways and emergency vehicle access, as 
well as a new permanent bleacher seating area were among the 
social considerations taken. Economically, the implementation 
of synthetic turf proved to be more cost-effective for the District, 
reducing the level of maintenance. Through the implementation 
of synthetic turf and new stormwater management system, the 
amount of fertilizers, pesticides, and contaminants reaching 
downstream waterbodies would be reduced, lessening the impact 
to the environment by improving the water quality of runoff to 
South Oyster Bay, a New York State 303(d) impaired waterbody.    
The complexity of this project arose from site constraints – 
namely shallow groundwater and the limited space available 
for each of the desired project features.  These constraints 
required H2M to be creative when selecting and laying out the 
new underground stormwater chamber system. Utilizing the 
space underneath the “D-Zone” of the multi-purpose field and 
the space adjacent to the proposed tennis courts to house the 
chambers provided a centralized storage location to which on-
site drainage pipes could convey runoff.  The location also helped 
to minimize conflicts with underground and surface site features, 
and provided enough space to accommodate the large footprint 
needed to meet New York State Water Quality Volume and peak 
runoff rate requirements while still maintaining a separation 
distance between the chamber system and groundwater.

Page 428

Sanitary Sewer Pump Station Design • 
Borough of Ramsey
Ramsey, NJ SERVICES  PROVIDED
Pump Station Design
Sewer Force Main Design
Temporary Bypass
Permitting
Construction Related Services
Construction Cost: $280,000
Our team designed the replacement of a 30-year-old ejector system with a new duplex grinder pumping station and new force main. A 
temporary bypass system was in place during construction to maintain service to the Borough’s customers.
Sanitary sewers were constructed on Brookfield Lane and 
Meadowbrook Road in the 1970s to serve 12 single-family 
residential homes and a veterinary hospital. A sewage ejector 
station was originally constructed at that time as a temporary 
measure until a tributary gravity sewer was constructed in Upper 
Saddle River. However, the gravity sewer was never built. The 
existing gravity sewer on Brookfield Lane, from which the force 
main flows, is tributary to the Northwest Bergen County Utilities 
Authority (NBCUA). The Brookfield Lane system has an estimated 
daily flow of 5,200 gallons per day (gpd).
Due to aging components within the 30-year-old ejector station, 
the Borough of Ramsey desired to replace it with a new, modern, 
submersible pumping station, including a valve vault. We designed 
a new pump station, along with a new small diameter force main. 
Our team obtained the required Treatment Works Approval (TWA) 
from the New Jersey Department of Environmental Protection 
(NJDEP) and Flood Hazard Area Individual Permit.
The new facility includes a 60-inch diameter, fiberglass wet well, 
and grinder pumping station in the same location, inside a fenced 
in gravel area at the end of Brookfield Lane. The duplex pump 
station is designed so that each pump is capable of handling 
2.5 times the average daily flow. A pressure level transducer is 
connected to the pump controller, which is mounted aboveground 
in a cabinet to turn the pumps on and off. The pumps operate in a 
lead-lag system, with the lead pump having an ‘on’ elevation set 
6 inches below the lag. The wet well has a concrete anchoring 
system that counteracts the effects of buoyancy on the fiber glass 
wet well. Additionally, a 48-inch inside diameter concrete valve 
vault was constructed.
The existing 4-inch diameter ductile iron pipe force main was 
replaced with a new 2-inch diameter PVC force main. The flow 
velocity through the new force main is above 2.5 feet per second 
to scour out any solids which may settle.
A temporary bypass system was employed to maintain service to 
the system’s customers. The bypass was created by plugging the 
first existing sanitary sewer manhole outside the ejector station, 
allowing wastewater to accumulate (acting as a temporary wet 
well), and then pumping to a manhole at the crest of the road 
that would then gravity flow to the sanitary sewer system. The 
bypass pumps were powered via a temporary electric service 
connection, with its own electric meter and account.

Page 429

Well Rehabilitation & Water System 
Distribution Replacement • 
Town of Newtown
Newtown, CT SERVICES  PROVIDED Distribution System Electrical & Instrumentation Upgrades
Construction Cost: N/A
H2M is designing and implementing the replacement water main for the Fairfield Hills Water System campus hub, water main relining, and 
rehabilitation of Well No. 8, including mechanical and electrical upgrades.
As part of a program to provide reliability and redundancy 
to the Fairfield Hills Water System, Well No. 8 needed a total 
rehabilitation. Well No. 8 is currently inactive, leaving the 
Town’s Well No. 7 as the only active source of water. The 
work encompassed the replacement of the well pump, column 
assembly, and motor. Additionally due to deteriorating quality of 
the well screen, a new well liner was required. The new pump 
was selected to be a vertical turbine to adhere to the Town’s 
standards. The entire electrical system required replacement 
and upgrades. The new system will be integrated with the Town’s 
SCADA system.
In coordination with the Town of Newtown, H2M provided the 
most cost-effective solution to completely rehabilitate the Fairfield 
Hill’s distribution system combination, including new HDPE water 
main and lining for existing cast iron water main, either in the 
paved roadways or in the grass areas as much as possible. A 
complete rehabilitation is required due to brown water present 
in the system if it is not flushed frequently and sequenced to 
avoid aging water. Along with replacing and lining water mains, 
valves and hydrants were replaced or newly installed as required 
in accordance with American Water Works Association (AWWA) 
standards and State of Connecticut Department of Public Health 
standards.
As Well No. 8 is the only backup for the Fairfield Hills water 
system, should Well No. 7 fail or become inactive, H2M separated 
the rehabilitation from the water main portion of the project to 
allow for this critical work to be bid sooner. 

Page 430

Drainage Improvements • 
City of New Rochelle 
Department of Public Works
New Rochelle, NY SERVICES  PROVIDED Civil Engineering Surveying
Construction Cost: $2.35 million
AWARDS
 ♦ ACEC New York - Platinum Award
The City of New Rochelle selected H2M to design improvements to existing drainage systems that serve a 2,000-acre watershed.
The existing drainage system encompassed more than 5,900 
linear feet of storm drain pipe that ranged in size from 12 to 66 
inches in diameter, including a 55” x 38” box culvert. Improvements 
were required to address significant flooding events within 
residential communities that occurred in 2007. A series of storms 
resulted in many homes and streets being flooded due to a 
drainage system that lacked the capacity to convey the intense 
rainfall. Portions of the existing drainage system were more than 
100 years old and the system had been modified and extended 
numerous times since its original construction. As a result of 
this “piecemeal” construction, numerous types of unorthodox 
construction methodologies were utilized to connect the various 
sections of the drainage system.
Record plans were contradictory, so H2M staff conducted an 
accurate inventory and field survey of the existing drainage 
systems. This included a physical observation of each accessible 
catch basin, manhole and  junction box in order to verify pipe sizes, 
pipe routing, and inverts.  To supplement the visual observation, 
video observations and tracing dye were utilized  to confirm pipe 
routing in areas where record information was unreliable or could 
not be field verified. Once an  accurate plan was developed for 
the existing system, appropriate improvements were designed 
based on a recent drainage study conducted by the City. Design 
improvements included combining parallel drainage lines, 
increasing pipe capacities and improvements to various drainage 
structures to improve hydraulics of the piping system. H2M 
prepared plans and specifications, and provided construction 
administration and observation services for the project.

Page 431

Watershed Drainage Analysis • 
City of New Rochelle
New Rochelle and Mamaroneck, NY SERVICES  PROVIDED
Drainage Evaluation
Concept Plan Report
Topographic Surveys
Hydrologic Analyses
Hydraulic Analyses 
Drainage Design
Construction Cost: N/A
The City of New Rochelle selected H2M to study the 
Pinebrook watershed to investigate known flooding and 
icing problems and develop solutions to address the 
flooding. H2M is working closely with the City’s Program 
Manager, Brooker Engineering, to meet the intended goals 
of the project.
The Pinebrook watershed is located in the eastern portion of 
the City. Portions of this watershed extend outside of City limits 
into the adjacent Town of Mamaroneck. A total of 36 known 
flooding issues have been identified throughout this watershed. 
In addition, one critical facility is located within this watershed. 
We began by reviewing the list of known flooding locations and 
observing each area to familiarize ourselves with the nature of 
every drainage problem. H2M met with representatives from 
the City and Brooker to review the known flooding locations and 
critical facilities throughout the watershed. Topographic surveying 
was required where limited information was available for certain 
locations. H2M then developed a “Concept Plan Report” that 
summarized the potential cause of flooding, proposed analysis 
scope and additional data/survey required, and proposed 
hydrologic and hydraulic methodology intended to evaluate 
potential solutions.
We also completed hydraulic and hydrologic analyses of the study 
area. Our analyses included 2-, 10-, 25- and 100-year recurrence 
interval storms. H2M reviewed the FEMA hydrology for FEMA-
studied streams We utilized Bentley SewerGEMS software and 
the United States Soil Conservation Service (SCS) Method to 
calculate peak runoff rates for various storm frequencies and 
HEC-RAS for stream modeling.  
H2M is currently designing alternative drainage solutions for the 
36 locations. For each alternative drainage solution, we prepared 
concept plans, cost opinions, and a cost-benefit analysis using 
the FEMA BCA Toolkit Software. A final report will also be provided 
containing map inventories, stormwater analyses, major findings, 
recommendations, priorities and cost opinions. The report will 
also include a watershed summary that summarizes the results 
of the study. Due to the anticipated large scale of the proposed 
improvements, the report will also identify the areas where the 
most and least favorable cost-benefit ratios have been identified 
so that improvements can be prioritized. 

Page 432

New Wastewater Pump Station • 
Nassau County Department 
of Public Works
Hempstead, NY
SERVICES  
PROVIDED
Design Report
Engineering Design
Construction Documents
Bid Services
Construction Administration
O&M Manual
Construction Cost: $6.8 million
As part of the Barnes Avenue Sanitary Sewer Overflow Correction, H2M acted as a subconsultant to plan and design the 
Hempstead Wastewater Pump Station.
The new conveyance system will divert a portion of the wastewater 
in the Village of Hempstead to a different wastewater collection 
system.
H2M prepared a technical design report for the 5.85 million gallon 
per day wastewater pump station in accordance with applicable 
articles of Chapter 10 of the Recommended Standards for 
Wastewater Facilities, the standards of the NCDPW, and the 
benchmark base level Security Measures for pumping Stations 
in the ASCE/AWWA/WEF Guidelines for the Physical Security of 
Wastewater/Stormwater Utilities. In addition, a construction cost 
opinion, a project schedule, and a preliminary list of drawings 
and technical specifications for the work were also presented.  
Our effort was coordinated with the prime consultant that was 
responsible for the design of the 14,800 foot long 30 inch 
diameter force main.  The pump station was constructed on a 
small triangular site between three high-traffic roadways.  
The final design included a new pump station with a divided 
wet well with two submersible pumps in each; installation of 
new precast concrete control and generator buildings with field 
installed exterior finishes; a new diesel fueled stand-by generator 
and double-walled fuel tank; emergency force main connection 
and flow meter; a new backflow prevention device on water 
service; new electric service; activated carbon vessel for odor 
control on the ventilation duct for each wet well; and a perimeter 
security fence.

Page 433

Roadway Stormwater Improvements • 
Nassau County  
Department of Public Works
Laurel Hollow, NY
SERVICES  
PROVIDED
Bidding Services
Regulatory Permitting
Site Engineering
Stormwater Management
Drainage Design 
Construction Cost: $160,000
The Nassau County Department of Public Works (NCDPW) engaged H2M to design stormwater drainage improvements along 
Cold Spring Road in Laurel Hollow, NY.
Stormwater runoff on Cold Spring Road collects at a low point 
located on a Nassau County-owned property and encroaches on 
neighboring properties during larger rain events. The resultant 
flooding and standing water creates public health and safety 
hazards for nearby residents.
H2M’s initial design incorporated a 180,000-cubic-foot stormwater 
recharge basin in accordance with NCDPW standards, as well 
as a drainage collection system to redirect runoff from adjacent 
private properties toward the recharge basin. However, it 
would cost the County approximately $575,000 to construct the  
basin and collection system, which exceeded the project’s 
available budget.
H2M proposed an alternative solution that would address flooding 
of nearby private property at a smaller price point. The new plan, 
at a cost of $160,000, involved placing fill on private property 
to eliminate low-lying areas and excavating portions of County 
property to offset the storage volume lost due to the placement of 
new fill. The County accepted this alternative solution and, after 
obtaining a building permit from the Incorporated Village of Laurel 
Hollow, construction was underway.

Page 434

H2M provided preliminary design, construction documents, and construction phase services for a new picnic area restroom 
building to replace an outdated facility.
This project consisted of new fully accessible men, women, and 
family toilet facilities at Bethpage State Park to replace an old 
and outdated facility.  The building is situated adjacent to a major 
parking field and picnic areas.
The building as well as access to the building was made fully 
accessible in accordance with the Americans with Disabilities 
Act (ADA) and the facility was constructed out of durable/low 
maintenance materials, with low maintenance interior finishes.
A masonry structure with a brick water table and cedar shake 
facade and a wood truss roof with architectural grade asphalt 
shingles was provided, emulating the architectural features of 
other Bethpage State Park structures.  The iconic Bethpage State 
Park golfer was incorporated into the tile pattern within the building.
The project scope also included new utilities, including electric, 
water, and an on-site sanitary system. 
New Park Rest Area
Architecture
Structural
Civil
Survey 
Construction Cost: $477,000
New York State Office of 
Parks, Recreation, and 
Historic Preservation
Bethpage, NY
SERVICES  
PROVIDED
Mechanical
Electrical
Plumbing

Page 435

Culvert Replacement • 
Suffolk County Department 
of Public Works
Smithtown, NY SERVICES  PROVIDED Stormwater Management Drainage Design Stormwater Outfall Mapping
Construction Cost: $1.1 million
H2M was retained to assess possible improvements to address localized flooding around the northeast branch of the 
Nissequogue River.
Upon H2M investigating the possible improvements to address 
localized flooding around the northeast branch of the Nissequogue 
River, one solution identified was the replacement of two culvert 
crossings at Branch Drive and Terrace Lane in The Branch.  The 
existing culvert did not possess the required capacity to convey 
the flow from a 10 year storm event.
H2M was able to avoid costly bypass pumping or stream 
diversions by taking advantage of the existing multiple pipe 
culvert system at both locations.  Although the overall culvert 
capacities were inadequate to convey the design storm flow, 
individual pipes were capable of conveying the low base flow.  
Existing pipes were left in place to convey the basic flow while the 
new culvert was installed.

Page 436

Drainage Improvements • 
Town of Clarkstown
New City, NY SERVICES  
PROVIDED
Topographic Survey
Civil Engineering
Inspection
Construction Cost: $260,000
Residents of Denver Drive were facing a significant flooding problem as a result of inefficient geometry of a pipe culvert 
and catch basin. The Town selected H2M to resolve the flooding. The existing culvert included 90 degree bends and an 
integral catch basin, which affected the hydraulic capacity of the culvert.
H2M developed a computer model to determine the peak flows 
from the tributary watershed to address this situation. In addition 
to removing the 90 degree bends, our evaluation identified 
the need to increase the existing pipe capacity. Changing the 
geometry of the culvert required obtaining easements from 
several homeowners.
H2M developed easement maps to assist the Town with obtaining 
these easements to construct temporary, as well as the new outlet. 
The final solution to resolve the flooding was to install a 71 inch 
by 47 inch corrugated metal pipe arch that would be large enough 
to convey the water from the stream under Denver Drive.

Page 437

Flooding Remediation • 
Town of Clarkstown
New City, NY SERVICES  
PROVIDED
Civil Engineering
Inspection
Topographic Survey
Construction Cost: $410,000
The Town of Clarkstown was experiencing major, damaging flooding along a critical town roadway that caused several 
closures of the town municipal pool center and significant economic loss from flood recovery.
H2M was selected by the Town to investigate the cause and 
recommend solutions. Drawing on decades of experience in 
stormwater and sewer design, along with our team of hydraulic 
engineers, we developed a hydraulic model of the existing 
600 acre watershed tributary to an existing drainage culvert, 
which was identified early on as a likely factor in the flooding. 
Recognizing that community development had increased the 
impervious nature of the watershed from its 1950s origin, 
appropriate runoff coefficients and IDF curves were used in the 
model and established the existing 18-inch  diameter corrugated 
pipe drain feeding the culvert was severely undersized.
Working with Town leadership we assisted in stakeholder 
outreach with private property owners and private utility 
companies including United Water, Orange and Rockland Gas, 
and Orange and Rockland Electric to develop a project plan 
for solving the problem. We developed contract documents for 
the replacement of the existing culvert with an 8 foot by 4 foot 
concrete box culvert that crossed under Lake Nanuet Drive and 
private property. The design also required the relocation of various 
other utilities, including the redesign of a sanitary siphon to allow 
for the box culvert installation. Also included in the design were 
recommended improvements to the Best Management Practices 
(BMP) that stabilized the surrounding stream, controlled critical 
velocities and minimized impacts due to erosion. We assisted the 
Town with acquisition of temporary and permanent easements 
and ensured all stakeholder matters were addressed in a timely 
manner, allowing for a successful project implementation that was 
on schedule and on budget. We also developed and implemented 
a Maintenance and Protection of Traffic Plan (MPT) for necessary 
construction detours.

Page 438

Roadway Improvements • 
Town of Clarkstown
West Nyack, NY SERVICES  
PROVIDED
Construction 
Administration & 
Inspection
Erosion & Sediment 
Control Plan
Landscape Design & 
Restoration
Retaining Wall &  
Culvert Design
Roadway Design
Site Engineering
Site Grading & Drainage
Streetscape Design
SWPPP Reports & 
Inspections
Utility Coordination
Construction Cost: $10.1 million
The Town of Clarkstown, NY, hired H2M to design culvert, roadway, and streetscape improvements to West Nyack Road.
H2M’s design work was Phase 2 of a broader initiative to 
mitigate flooding, enhance the Town’s open space portfolio, and 
integrate the Hamlet Green & Firefighter Memorial Park, which  
H2M restored during Phase 1, into the heart of West Nyack’s 
business community.
Adjacent to the park is West Nyack Road, a two-lane, 2,100-linear-
foot roadway that connects the park to businesses at the  
western end of the road, but lacked comprehensive walkway 
connectivity. The site also featured undersized culverts 
connecting channels on the north side of West Nyack Road to 
the wetlands south of the road.
The redesign replaced the two undersized culverts and raises 
the elevation of West Nyack Road to incorporate additional 
drainage infrastructure. New sidewalks running the length of 
West Nyack Road now connect the park with the business 
community. Furthermore, West Nyack Road has been widened 
to provide additional on-street parking and re-aligned, along with 
West Nyack Way and Klein Avenue, to create a new four-way 
intersection. Other renovations include new off-street parking, 
street lighting, traffic calming features, plantings, and a small 
pocket park with a fountain to serve as the centerpiece of the 
Phase 2 improvements.
H2M also coordinated with local utility providers to relocate existing 
overhead utility infrastructure underground. Additionally, Con 
Edison had advised of its intention to install a new underground 
service line below West Nyack Road; prior to construction,  
H2M revised plans to incorporate the new utility line into the 
renovation design.

Page 439

Sanitary Sewer Improvements • 
Town of Clarkstown
New City, NY SERVICES  
PROVIDED
Engineering Design
Facility Planning
Construction Administration
Construction Oversight
Construction Cost: $2,515,000
The Town of Clarkstown selected H2M to rehabilitate 
various portions of the existing sanitary sewer collection 
system within the Town with construction  taking place 
over several years.
The existing sewers selected were based on previous studies 
and maintenance records to have signs of infiltration which is 
contributing excess flow to the receiving sewage treatment plant.  
The force mains selected were those that have shown signs of 
leaking or are being re-sized due to pump replacements in order 
to meet current design standards.  
H2M prepared an engineering report that described the existing 
sanitary sewers, described the proposed improvements and 
presented cost opinions for all of the proposed work.
For each project, a sewer construction contract was prepared 
for the work.  The projects included:
Project 1:
• Lake Nanuet Park – 613 LF eight inch diameter gravity 
sewer with 150 LF double barrel inverted siphon
 
Project 2:
• New Haven Avenue – 564 LF 10 inch diameter gravity 
sewer replacement
• Dykes Park Road – 1,408 LF eight inch and 10 inch 
diameter gravity sewer cure-in-place lining
• Long Clove Road – 1,975 LF four inch diameter force 
main piping replacement
• Van Doren Court – 770 LF three inch diameter force main 
piping replacement
• North Greenbush Road – 696 LF three inch diameter force 
main piping replacement 
• Holland Drive – 704 LF four inch diameter force main 
piping replacement 
 
Project 3:
• North Main Street – 2,700 LF 12 inch diameter gravity 
sewer replacement
 
Project 4:
• NYS-Route 303 – 1,721 LF eight inch diameter gravity 
sewer lining
• Pineview Avenue – 978 eight inch diameter gravity sewer 
lining
• Aberdeen Drive – 2,639 LF eight inch diameter gravity 
sewer lining
• During construction, H2M provided periodic construction 
observation, reviewed shop drawings, and reviewed 
contractor payment requests.

Page 440

Stormwater Wetland Development • 
Town of Clarkstown
New City, NY SERVICES  
PROVIDED
Stormwater Evaluation
Site Evaluation
Drainage Design
Stormwater Outfall Mapping
Construction Cost: $7.7 million
H2M was retained to develop a stormwater management plan containing green infrastructure practices to mitigate flooding 
and improve water quality within the West Nyack section of the Town of Clarkstown.
Green infrastructure practices include a stormwater wetland 
retrofit.  In addition, the project also includes improvements to 
two culvert crossings, the realignment of West Nyack Road, and 
renovations to an existing park and playground.
Using stormwater management software, H2M modeled the 198 
acre tributary area of an existing degraded wetland system, as 
well as the associated stormwater conveyance systems, and 
used the results to design a stormwater wetland retrofit at the 
site capable of managing the runoff from the entire tributary area.  
The constructed wetlands combine shallow marsh areas with 
permanent pools to provide a stormwater management practice 
capable of providing extended detention, improving water quality 
and reducing the potential for flooding during storm events.  The 
developed area also creates a new habitat for area wildlife.

Page 441

Coastal Stormwater Drainage Study • 
Town of Hempstead
Hempstead, NY SERVICES  
PROVIDED
Civil Engineering Stormwater Modeling
Construction Cost: $300 million
!(
!(
!(
!( !(
!(
!(
!(
")
")
!(
!(
")
")
!(
!(
")
")
!(
!(
")
!(
")
!(
")!(
")
!(
!(
")
!(")
")
")
")")
!(")
!(
!(
")
")
")
!(
")
!(
")!(
")
!(!(
!(
")
")
")
")
")
")
!(
")
")
")
!(
!(
")
")
")")
!(
")")!(
")
")
")
!(")
!(!(
")
!(
!(
")
")
!(
")
")
!(
")!(
")
")
")
")
!(
!(
")
")
")
")
!(
")!(!(
!(
")")
")
!( !(
") !(
!(
!(
!(
")
")
")
!(
!(
!(
!(
")
!(
")
!(
!(!(
")
")
!(
")
!(
")!(
!(
")!(")
!(
!(!(
!(
!(
!(
")!(
")
")
!( ")
!(
")
")
")
!(
")
")
!(
")
!(
")
")
!(
")
")
")!(
!(
!(
")
")
")!(
")
")
")!(
!(
")
!(
") ")
!(") ")
!(
!(
") ")
")
!(
")
") !(
") ")
!(")
")
")") !(")!(
!(")
")!(
!(
!(
!(
")!(
!(
!( !(
!(
")")
!(
!(
!(
!(
")
!(
!(
!(
")
")
!(
")
!(
!(
!(
")
!(!( !(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
")
!(
!(!(
")
")")
")
!(
") !(
")!(
")
!(
!(
!(
")
")!(!(
!(
!(
")
!(
!(
!(
")!(
!(
")
")!(
!(
!(
!(
")
")
")
")
!(
")
")
")
")
!(!(
!(
")
!(
!(
")
")
!( !(
!(!(")
!(
")!(
!(
!(
!(
!(
!(
")
")
")
")
!(
")
") !(
!(
") ")
")
!(
!(
!(
")
!(
")
")
!(
!(
!(
")
")
!(
")
!(
")
")
!(
!(
!(
!(
!(
!(
")
!(
")")
!(
!(!(
")
!(
")
!(
")")
!(
")
")
!(")
!(
")
")
")
!(
")
")
!(
!(
!(")
")
!(
")
!(
")
") ")
")
!(
!(
")
")
")
")
!(
!(
")
")
!(
!( ")!(
")
!(
!(
!(!(")
!(
!(
")
!(
")") ")
")
!(
!(
")")
!(
!(
")")
!(
!(!(
!(
!(
!(
")
")
")
")
!(
")
!(
")
!(")
!(
")
!(
!(
")
")
")")
!(
")
")
!( ")
!(
!(
") !(
!(
!(
!(
!(
!(
!(
")
!(
!(
!(
")
!(
")
")
!( !(
!(
!(
") !(
!(
")
")!(
")")
!(
!(
")
")
!(
!(
!(
!(
!(")!(
!(
")
")")
")
!(
")
!(!(
!(
!(
")
")!(
!( ")!( !(!(
!(
")
")
")
!(
")
")
")
")
")
!(
")
")
")
!(")!(
")!(
")
")
!(
!(
")")
!(
!(
")
")
!(
")
")
!(
")")
!(
")
!(
")
")
")
")
!(
")!( !(
!(
") ")
!(!(
")
")
!(")
")
")
")
")
!(
")
")
!(
!(
!(
!(
")
!(
")")
")
!(
")")
!(
")
")
")
!(
!(")
")
")
")
")
!(
!(
!(
!(
!(
")
")!(
")
")
!(
")")")
")
!(
")
")
") ")
")
")
!(
")
!(
!(
!(
")
")
!(
!(
!(
!(
")
")
!(
")
")")
!(
")
")
")
")
")
!(
!(
!(
!(
!(
")
!(
")
")
")
!(
")
!(
!(
!(")
!(
") !(
!(
!(
!(
")
!(
!(
!( ")
!(")
")
")
")
") ")
")")
!(
!( !(
!(
")
!(
")
")
")
")
")
")
")")
!(
!(
")
")
!(")
")
!(
")
")
!(
!(
!(
!(!(
!(
") ")
!(
")
")
")
")
")
")
!(!(
")
")!(
!(
!(
!(
")
")
")
!(
!(
")!(
")
!(
!(
")
!(
")
")
!(
!(
!(")
!(
!(
")
")
")
!(
!(")
")
!(
") ")
")
")!(
")
!(
")
!(
")
")!(
!(
!(
")
!(
")
")
!(
")
")
!( ")
!(
!(
!(
!(")
")!(
!( !(
!(
!(
")
!(
")
")
!(
")")
")!(
") !(
")
!( ")
!(
!(
") !(
!(
")
!(
!(
")!(
") ")
")!(
!(
")
!(
")!(
")
!(
") ")
")
")
!(
")
")
!(
!(
")
")
")
!(
")
")
!(
!( ")
")
")
") !(
")
!(
")
!( !(
!(
!(!(
")
!(
!(
!(
!(
!(
")!( !(
")
")")
")
!(
")
")
")!(
")
!(
!( ")
!(!(
!(
!(
")
!(
")")!(
")
")
!(
!(
!(
!(
!(
!(
")
!(
!(
!(")")
")
!(
!(
!(
!(
")
")
!(
")!(
!(
")
!(
!(
!( ")
!(
")
")")
!(
!(
")
!(
")!(
!(
!( ")
!(
")
")
")")
")
!(")
")")
!(
!(
!(!(
")
")!(
!(
!(
!(
")
")
")
!(
")
!(
")
")
!(
!(")
")
")
")
!(
")
!(
")
!(")
!(
")
!(
!(
")
!(
") !(
!(
")!(")
!(
!(
")")
!(
!(
") ") ")
!( !(
!(
")
")")
") !(")
")")
")
!(
!(
!(
!(
!(
")
!(
!(
")
!(
")
!(
!(
")
")!(!(
!(
!(!(
")
")
")
")!(
")
!(
!( ")
")
!(
")
!(
!(
!(
!(")
")
")
!(
!(
")
")
!(
")
") ")
!(
")")
!(
!(
!(
!(
!(
!( !(
")
")
!(
!(
!(!(
")
")
!(")
")
!(
!(
")
!(
!(
") !(!(
!(
!(
!(
!(
!(
!(
!(
!(
")
")
!(
")
")
")
!( !(
")
!(
")
")
")
")
!(
!(
!(
!(
!(
")")
")")
!(
!(
")
")
!(
")
!(
!(
")
")
!( !(
!(
")
!(
")")
")
")
!(
!( !(
!(
")
!(
!(
")
")
")
")
!(
") ")
")
!(
!(
")
!(
!(
")
")
!(!(
!(
")
!(")
!(
")
!(
")
")
")
")
!(
")
")
")
")
")
")
!(
!(
!(
!(
")
!(
")
")
!(
")
!(
!(
!(
")
") ")
!(
")
!(")") ")!(
!(
")!(
")
")
")
!(
!(
!(
")
!(")
!(
")
!(
")")
!(
")
")
!(
!(
!(
")
!(
")
!(
")
!( ")
!(")
")
!(
")
")
!(
")!(
")
!(
")
!(
!(
")
")
!(
")
!(
")!(
!(
!(")")
!(
!(
!(
!(
")
")")
")
")
!(
")!(
")
!( ")
")
!(
!(
")
!(")
")
!(
")
!(
!(
!( !(
!(
!(
!(
")
!(
!(
")!(
")
!(
!(
")")
")
")
")
")
")
!(
!(
!(
!(
!(
")
")
!(
")
!(
")!(
")
")
!(
!(
")
")
")
")
")
")")!(
!(
!(
!(
!(
")
")
")
")
")
!(
!(
")
!(
")
!(
!(
")
")
!(
")
!(
")
!(
")
")
")!(
!(
!(
")
!(
")
")
")!(
")")
")
")
")!( ")
")
!(!( ")
!(
")
")!(
!(")
!(
")
")
!(
")")
")
")
")
") ")
")
!(
")
!(
!(
!(
")
!(") ")
")
!(
")
!(
")
!(")
")
")
") ")")
!(")
!(
")")
!(
")
")!(
!(
!(
!(
!(
!(
!(")
")
")
!(
!( ")!(
!(
") ")
")
!(
!(
")
!(
!(
!(
")
!(
")")")!(
") ")
")
!(
")
!( ")
!(")
") !(
")
!(
!(
")
!(
")
!(
")
")
!(
!(
!(
!(
!(
!(
")
!(
!(
!(
")
")
")
")
!(
")
!(
")
!(
!(
")
")
!(
")
!(") ")
!(
!(")
")
!(
!(
")
")
")
!(
")!(")
!(
")!(
")
!(
!(
!(
!(
")
!(
!(
")
!(
")
")
!(")
!(
!(
")
")
!(
")
!(
")")
!(
")
!(
!(
!(
")
")
!(
!(
")
!(")")!(
")
")
")
!(
")")
!(
")
")
!(
")
")
!(
")
")")
!(
")
")
!(
")
!(
")
")
!(")
")
!(
") ")
")
")
")
!(
!(
!(
")
")")
")
")
")
")
!(
!(
!(
")
")
")
")
!( ")
")
")!(
!(
")!(
!(
!(
")")
!(
!(
!(
!(
!(
")
!(
")
!( ")
!(
")
!(
!(
")
")
")!(
!(
")
!(
")
")
")
")
")
")
!(")
!(
!(
!(!(
")
!(!(
!(
")")
!(
!(
!( !(
")!(
!(
!(
!(
!( !(
!(
!( ")!( !(
")
!(
")
")
")
")
")
")!(
!(
!(
")
")
")
")
!(
!(
!(
!(
!( !(
")
")
!(
")
!(
!(
!(
!(
!(
!(
!(
")")!(
")")")")
")")!(
")")
")")")")")!(") ")")")")
")")
")")
")")
!(
")")
")")!( ")")")
")")!(
!(")")
")")!(
")")!(
")") ")")!(!(
")")")!(
")")
!(!(
!(") ")!(!(")
")")")")")!(!(!(")")!(!(!( !(!(!( !(!( !(
!(!(")")")")!(!(
")") !(
")")!(!(
!(
!(
!(")")!( ")")
")")")!(!(!(
!(
!(")") ")") ") ")")!(
")")")
")")
!(
")")")!(")")!(!(
")")
")")
")
")")
")")!(!(")")")")!(
")
!(
")")!( ")!(") ")!( !(!(")
")")")")!(")")!(")
")")")
")")
")")!(
!(!( !( !(")")
!( !(")") ")!(
") ")!(!(
")")")!(!(
!(!(
")")!( !(
!(
!( ")")!(
")")!(
")
")
")
")
")!(
!(!(")")
")")
")")")
!(
!(
!(
")")!(
")") ")") !( !(
")")!(
!( !(
")")")!(
!(
!(
!(
")")!(
")")!(!(")
")")")!(
!(
")")
")
!(
!(
")")")!(!(!(!(!(
")
")
")")!( ")")!(
")")")")!( ")")!( ")")")")
!(")
!(
!(
")")
")")
!(
!(
")")
")!(!(
!(!(
!(!(!(
")!(!(
")")!(
")")!(
")")!(!(
!(")")!(
")")
")")
!(
!(
")")!(
")")!(
!(
")") ")
")
")")
!(
!(
")")!(
!(")
!(!(")")")!(
!(
!(")")
!(")
")!(
")")")")!(")")
")
!(
!(!(
!(")
")")
")")!(
")")!(
!(")
")")!(
")!(
!(
")")
")")")!(!(
!(
!(")
")")")!(!(
!(")")
!(
!(
!(!(")")")")
!(")
")")!(!(!(")
")!( !(!(")")
!(")
")")
")")
")")
")")
!(
!(
")")!(
!(
!( !(
!(")")
")")")
!(
!(")") ")")")")
") ")
")
")")!(
!(")")
")")
!(
")
")
!(
")")!(
")")!(
")")!(
")")!(
!(")")
")")")!(!(
!(
")")")!(!(
")")!(
")")!(
!(
")")
")")!(
!(
")!(
")")!(
")")!(
")")!(
")")
")")
")!(!(!(")")")")")")
!(
")")
")")")!(
")")")!(
!(
")")")!(!(
")")
")")
")!(
")")
")")
")")
")")")")
!(
")")!(
")")")!(
")")")
")")")!( ")")
")")")")")!( !(
")")") ")")!(
")")!(!(
") !(
")
!(!(
!(
")") ")") !(
")")
")")
")")
")")!(
")")
")")!(
")")
")")!(!(
")")!(
")")!(
")")
")")")!( !(
!(
")")
")")!(!(!(
")")
")")
")")
!(
")")
!(
!(!(!(")")
")")
")")!(
")")
!( ")")
")")
!(
")")!(")")!(
!(")")")
")")
")")!(!(
")")
!(
")")!( !(
!(")")
")") ")
")")
")")
")")!(
!(
")")
!(
!(!(")!(
")!(
!(
!( !(")
")") ")!(
")")!(!(!(
!(")")")!(
!(
")")!(
")")")")!(
!(
")") ")")!(
")")!( ")")
")")
")
")")!(!(
")")!( !(
")")")")!(
")")
")")!(
")")
")")
!(
!( !(")")")
!(
")")") ") ")")") !( !(
")")
")")
")
")")
")")
")")
")")
")")
")")
!( ")")!(
")")
")")
!(
")")
!( ")")!(
")") ")")")
")!(
!(
!(
")")
!(
")")")") !(!(
!( ")") !(!(
")") ")
") ")")
")")")")
") ")")")
")") ")")
")") ")")
")")
")")
")")
!(
!(!(
!(!(
!(
!(
!(!(
")")")")
")")")")!(
!(
!(
!(!(
")")")")
")") ")")
")")")")
")")")")
")")
")")")
")")
!(
!(
!(!(
!(!(!(!(
!(!(!(
")")
")")
")")")
")")")
!(
!(
!(
!(
!(
")
")")")
")")
!(
!(
!(!(
!(!(")")
")")
")")
")")")")
")")!(!(!(
!(
!(!(
!(
!(!(
")") ")")")")") ")")")") ")")")")
")")")") ")
")")
")")
")")")")")
!(!(
!(!( !( !(!( !(!(
!(")")
!( !( !(
")")")")
")")
")")
") ")") ")")!(!( !(!( !( !( !( !(")
")")
")")
!(
!(
")")
!(
")")
")")!(
!(
!(
")")!(
")") ")")
")")
")
")
")")")")
!(
!(
!(
")")
")")
")")
")")!( !( !(
!(
!(
!(
!(
!(
!(")")
")")
")
")")
!(
") ")
")")
")")
")
")")")") ")") !( !( !(
")")
")")
")")
!(
!(!(")
")") ")") !( !(
!(
!(")")")
")")!(
") ")")
")")
")")!(
!( !(!(
!(
!(")")
")")!(!(!(
!(")")")
")")
")
")")
!(
!(
!(
")")
")")
!(
")")
!(!( !(")")
")")!(
")
") ")")")!(!(
")")!(
")")")
")")")
!(
!(
!(
!( !(")")
")")")") ")")!(
")!(
")")")
")")
")")
")")
")") ")")
")")
")
")
") ")")")") !(")
")
")")
")
!( !(
!(
!( ")")
!( !( !(!( ")")
")")")
")")")
")")") ")")
")")
!(!(
!( !(
!(")")")!(
!(
!(!(!(!(
!(
!(
!(!(!(!( !(
!(
")") ") ")")
")") ")
")")")")")
")")")")
")")
")!( ")")!(")")")")")")")
")")")")") ")")")
")")
")")
")")")")
") ")")")")")")") ")") ")")
!(
!(
!(!(
!(!(
!(
!(!(!(
!(
!(
!(
!(") !(!( !(!( !(
")")
!(!(!(!(
!(!(!(
!(!(!(!(
!(")")")")")") !( !(!( !( !(
!(!(
!(!(
")")
") ")
!(
!(")")
!( !( !( !(!(!(!( !( !(!(
!(
!(")")
") ") ")") ")")")!(
")")")!(!(!( ")")")")") ")")
")
")")
")
!(
!(!(
!(!(!(
!(
!( !(
!(
")
")")")")
")")")")")")
")")
")
!(
!(!(!(!(
!( !(
!(
")")
")
!(
!(
!(
!(
!(
")
")")
")")")
")")")
")") ")") ")
")")
")")
")")")
!(
!(
!(
!(
!(
!(
!(
!(!(")")")")
!(")")
!(!(
!(!(!(
")")")
")")
")")")") ")")
")")
")")")!(
!(
!(
!(
!(
!(
!(
")") ")") ")") ") ")")") ")")") ")")") !( !( !( !( !(
")")")") ")")") ") ")")")") ")")")") !(!( !(!( !( !(!( !( !( !(")") ")")")")
!(
!( !( !( !(")") ")") ") ")")!(!(
")")!(") ")")!(
!(
")")
")") ")")
")")
")
")")
")")")
!(
!(
!( !(
!( !( !(
")")")
")")")")
")")")") ")
")")")")
")")
")")!(
!(
!( !(
!(!(
")
")")")
")")")")")") ")") ")")
!(
!(!(!(
!(!(!(!(!( ")")")")")")")")!(!(!(!(
!(")")
")")") ")") !(!(!(!(
!(!(")")")")
")")") ")")")
") ") ")
")")
")
")")
")
")")
")")
!( !( !( !( !( !(!(!(
!(
")")")!(
!(!(!(
!(!(
!(!(
")")")
")")")")
")")!(
!(!(
!(
!(
!(
!(!(
!(!(
!(")")
")")")")
")")
")")
")")
!(
!(
!(
!(
!(
!(
")
")
")
")
")")
")")
")")
!(
!(
!(!(!(
!(
!(!(
!(!( ")")!(")")!(
")
")")")")
")")!(
")")")")!( !( !(
!(!(")") ") ")
")")")")!(
!(
!(
")")
")")")
!( ")")!(!(
")")")") !(!(
")")
")")")
")")
")")") !(
!( !(
!(!(")
!(!(!(")")")!(
")") ")")")")!(
")")")")
")")
!(!(
!(!(!(!(")")!( !(!(
")")")
")
") ")")
!(!(
!(!(!(!(
")!(!( !(
!( !(!(")")")")")!(
!(
!(
!(")")
")")")
!(!(")") ")") ")") ")")")")!(!( !(!(!(
!(
")")")!(
")") ")") ")")")
")")
")")")")")")
!( !(!(!( !( !(
!(!(!( !(!(!(
")")")
")")")")
")")")")!(
!(!(!(
")")")")")
!(
!(
!(!( !(
")") ")")!(!( !( !( ")")!(
")") ")")!(!(
")")!(
")")")") ")")
")")")")")") !(!(
")")")
")")") ")")")") ")") ")")!(!(!(!( !( !( !(!(
")")")")")!( ")")")") ")") !(!( !(
")")
")") ")")
")")!(!(
!( !(!(!(
!(")")")!(!(
!(
!(
")
!(
!( !(
!(
!(
!(
")
!(
!(
!(
!(
")
Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), MapmyIndia, © OpenStreetMap contributors, and the GIS User Community
Legend
Drainage Structures
<all other values>
STRUCTURE_TYPE
") Catch Basin
!( Culvert
!( Drywell
Large Structural BMP
!( Manhole
!( Outfall
Pump Station
Structure
Unknown
Drainage Pipes
!(
Proposed Tidal Valve Locations
Oceanside Boundary
0 820 1,640410
Feet
During several coastal storms, including Hurricane Irene, Tropical Storm Lee and Superstorm Sandy, many communities 
along the south shore of Long Island were subject to severe flooding due to high tides and heavy rain. Existing drainage 
infrastructure was completely overwhelmed, which resulted in the inundation of roadways, homes, schools, municipal 
buildings and businesses.
The development of a comprehensive analysis for the Oceanside 
hamlet was  identified as a project as part of the NY Rising 
Community Reconstruction (NYRCR) Program within the 
Governor’s Office of Storm Recovery (GOSR). These plans 
outlined numerous projects to help rebuild more resilient 
communities in response to the severe storm damage.
H2M staff performed hydrologic and hydraulic evaluations for 
the drainage systems within the 3,000 acre study area to assess 
the abilities of these systems to convey runoff from the tributary 
watersheds. Computer modeling was utilized to calculate 
peak runoff rates for various storm frequencies. Based on the 
results of the computer modeling, we were able to recommend 
improvements to existing infrastructure to alleviate flooding 
during storm events, including increasing pipe capacity, installing 
pump stations, raising road elevations and developing green 
infrastructure techniques to improve water quality.
SEIFFERT COURT
REPLACE 850 LF OF EXISTING 24" DIA. PIPE WITH 36" DIA.
PIPE BETWEEN SEIFFERT COURT AND OCEANSIDE ROAD
$635,000
RIVER AVENUE & WATERVIEW ROAD
REPLACE/ELEVATE 200 FEET OF BULKHEAD &
REPLACE 200 LF OF 15" DIA. PIPE WITH 18"
DIA. PIPE $300,000
LAWSON BLVD.
NEW 36" IN LINE TIDAL CHECK
VALVE . $60,000
NEW 16,000 GPM STORMWATER
PUMP STATION . $16,000,000
WEIDNER AVENUE
NEW 24" IN LINE TIDAL CHECK
VALVE  $53,000
NEW 2,500 GPM STORMWATER
PUMP STATION $2,500,000
CARREL BLVD.
RAISE ROAD 800 FT
APPROXIMATELY 6"
$2,400,000
CARLOU COURT
NEW 1,000 GPM STORMWATER PUMP
STATION $1,000,000
NEW 18" IN LINE TIDAL CHECK VALVE
$48,000
4TH STREET
REPLACE 1,400 LF OF 24" DIA.
PIPE WITH 36" DIA. PIPE
$1,000,000
BENJAMIN ROAD
NEW IN LINE 36" TIDAL CHECK
VALVE $60,000
NEW 81,000 GPM STORM WATER
PUMP STATION  $81,000,000
DERBY DRIVE
REPLACE 200 LF 18" DIA. PIPE
WITH 24" DIA. PIPE $80,000
DERBY DRIVE
REPLACE 200 LF 15" DIA.  PIPE
WITH 18" DIA. PIPE $75,000
STANTON PLACE, LOUIS PLACE
AND MORELAND AVE.
RAISE  ROAD, 12" $1,700,000
BEVERLY ROAD / STANLEY PLACE
REPLACE 36" OUT FALL PIPE SOUTH
OF TINKER DR. LOWER OUTFALL
PIPE AND DRAINAGE DITCH  $620,000
LAWSON BLVD.
REPLACE 900 LF OF
DRAINAGE PIPE . $450,000 MOORE AVE. / FULTON AVE.
INSTALL 2,000 LF
HORIZONTAL LEACHING
CHAMBERS, ALONG MOORE
AVE. $650,000
PERRY AVE.
INSTALL ADDITIONAL INLETS
$170,000
LINDBERGH AVE.
NEW 8,000 GPM STORMWATER PUMP
STATION $8,400,000
INCREASE PIPE CAPACITY. $80,000
NEW 18" IN LINE TIDAL CHECK VALVE
$48,000
LAWRENCE AVE.
CLEAN DEBRIS
FROM PIPE $40,000
LAWRENCE AVENUE
NEW 79,000 GPM STORM
 WATER PUMP STATION
$79,000,000
NEW IN LINE 42" TIDAL CHECK
 VALVE AT OUTFALL ON DALY
BLVD. $66,000
ROYAL AVENUE
RAISE ROAD 6" $550,000
HAMPTON ROAD
INSTALL ADDITIONAL INLETS
AT LOW POINTS $170,000
OCEANSIDE DRAINAGE IMPROVEMENT PLAN
RECOMMENDED IMPROVEMENTS AND COSTS
4TH ST. & 5TH ST.
NEW IN LINE 48" TIDAL CHECK
VALVE ON OUTFALL PIPE AT
WAUKENA AVE. $70,000
NEW 44,000 GPM STORM
WATER PUMP STATION
$44,000,000
EVANS AVE.
NEW 30,000 GPM STORMWATER
PUMP STATION $30,000,000
NEW INLINE 42" TIDAL CHECK
VALVE ON OUTFALL PIPE AT
WEST WAUKENA AVE. $66,000
LAWSON BLVD.
RAISE INTERSECTION
AT WEIDNER AVE.
$4,000,000

Page 442

Pump Station Upgrades • 
Town of Huntington
Huntington, NY SERVICES  
PROVIDED
Civil Engineering
Electrical Engineering
Construction 
Administration 
Construction Cost: $100,000
H2M was retained by the Town of Huntington Highway Department to provide engineering services for the replacement of 
the submersible pump and control panel at Recharge Basin 376.
The existing submersible pump at the recharge basin pump 
station had reached the end of its service life and was no longer 
operational. The pump station itself, with a history spanning over 
four decades, featured an eight-foot-diameter-by-23-foot-deep 
concrete wet well. The pump is designed to transfer stormwater 
from Recharge Basin 376 to a drainage manhole located 
upstream of Drainage Basin 408 whenever water levels in Basin 
376 become elevated and pose a risk of localized flooding.
After reviewing available plans and topographic data, H2M 
prepared hydraulic calculations to select a new pump. The 
pump was procured through a Suffolk County contract, which 
streamlined the purchasing process and significantly reduced the 
lead time compared to traditional bidding practices. Installation of 
the pump was completed by one of the Town’s on-call contractors, 
further expediting the project schedule.
During the scheduled start-up of the newly installed pump, it 
was discovered that the existing pump control panel was also 
inoperable. This necessitated the preparation of additional 
specifications for a new pump control panel, which was installed 
by the Town’s on-call instrumentation and control contractor.
As a result of the project, the pump station is now equipped with 
a new submersible pump and a modern control panel, improving 
reliability and efficiency.

Page 443

Roadway Reconstruction • 
Township of Parsippany - 
Troy Hills
Parsippany, NJ SERVICES  PROVIDED Civil Engineering Roadway Design Land Surveying Construction Documents
Construction Cost: $19,400
H2M performed surveying and engineering services for the milling and resurfacing of approximately 3,200 linear feet of roadway.
As part of the Township of Parsippany’s annual program for 
roadway improvements, H2M was selected to perform surveying 
and engineering services for the milling and resurfacing of 
approximately 3,200 linear feet of Waterview Boulevard from 
Route 46 to Parsippany Boulevard.  In addition to the milling and 
resurfacing, new concrete sidewalks were installed on the south 
side of the roadway with mid-block crossings being introduced in 
several locations. Selective removal and replacement of existing 
curb and sidewalk, replacing of inlet castings, base repair, and the 
construction of new handicap ramps were also part of the project.
The project plans and specifications were prepared in accordance 
with New Jersey public bidding requirements and all technical 
specifications were in accordance with New Jersey Department 
of Transportation (NJDOT) format. 

Page 444

Road and Drainage Improvements • 
Township of Pequannock
Pequannock, NJ SERVICES  PROVIDED Drainage Design Curb Design Roadway Design Construction Inspection
Construction Cost: $1.6 million
Due to a deteriorated road condition, and poor condition of the existing drainage infrastructure, we recommended that the Township rebuild 
the entire Village Area roadway. Approximately 12,000 linear feet of roadway were rebuilt, 23,000 linear feet of deteriorated concrete curb 
was replaced, and drainage improvements were constructed in a residential area.
The utilities of the residential “village” neighborhood in Pequannock 
were recently upgraded, including new sanitary sewers, new 
water mains, and new gas mains. The magnitude of this utility 
work left the roadway in a deteriorated condition.  In addition,  the 
generally flat topography and poor condition of existing drainage 
infrastructure left the area susceptible to flooding.  Therefore, 
at our recommendation, the Township decided to rebuild the 
entire roadway to make changes to the roadway alignment, 
and construct additional drainage infrastructure. This work 
restored the character of the neighborhood and gave it a bright 
appearance.
The existing roads were very flat (below recommended 
minimums) and the spacing between the catch basins was far. To 
improve drainage, the vertical alignment of the road was changed 
to increase the road grade to the minimum recommended 
standards for residential areas. To limit the effects to adjoining 
properties, additional high and low points were added to the roads 
to maintain the average elevation.  Additional seepage-type catch 
basins and perforated overflow piping were added at the low 
spots to improve drainage. In addition to the existing substandard 
grades, the project streets had irregular roadway widths and wide 
intersections. Changes to the horizontal alignment were made 
to create a uniform roadway width and improve control at the 
intersections. Additionally, the driveways and front yards were 
close to the same elevation as the existing roads and the project 
streets were narrow. Mountable granite block curb was chosen as 
the new curb material to match the existing residential properties 
better and to better accommodate vehicles on the narrow roads.
The reconstruction of the roads was accomplished through a 
process of roadway reclamation with an asphalt overlay. The 
entire roadway base was milled, stabilized, and rolled smooth 
to provide a compact roadway base. A layer of asphalt was then 
constructed over the compact base to provide a durable roadway.
Several construction crews worked to complete the project.  
Extensive coordination was required for traffic access, as the 
“village” neighborhood has limited access into the development.  
Additionally, our construction inspection team communicated 
effectively with residents on a daily basis. 

Page 445

Roadway Reconstruction and Tree Mitigation • 
Inc. Village of Bellerose
Bellerose, NY SERVICES  
PROVIDED
Roadway Design Tree Mitigation
Construction Cost: N/A
H2M’s Civil Engineers were tasked with designing the full replacement of pavement and curbs for various streets in 
Bellerose, NY. 
After receiving a grant from New York State, the small Village 
of Bellerose elected to commence with a roadway improvement 
program for the first time in over 50 years.  With no experience 
managing such a large project, the Village asked H2M for 
assistance.  Initially, H2M assessed the condition of the 
pavement throughout the entire Village and prioritized several 
roads that could be completed within their budget. Ultimately, 
portions of Hudson Road and Ontario Road were selected for 
reconstruction.  Neither road included a proper aggregate base 
and curbs were sporadic and of random construction.  As a result, 
full replacement of pavement and curbs on each street was 
warranted.  These roads were also wider than most residential 
streets, so H2M recommended reducing the width of each street 
to reduce the quantity of storm water runoff and also reduce 
the impact to numerous large trees that might otherwise have 
required removal due to the construction of new curbs. The 
completed project required removal of only three trees out of the 
109 throughout the project limits in order to maintain proper flow 
of storm water along the new curb and gutter.

Page 446

Roadway Improvements • 
Incorporated Village of 
Hempstead
Hempstead, NY
SERVICES  
PROVIDED
Construction Administration
Construction Inspection
Roadway & Roundabout 
Design
Site Grading & Drainage
Traffic Signal Design
Construction Cost: $6.4 million 
H2M designed realignments and other roadway 
improvements for the Incorporated Village of Hempstead 
in Nassau County, NY.
The Incorporated Village of Hempstead intended to resurface 
several roads as part of the Village’s 2024 road improvements 
program. The roads presented substandard driving conditions, 
including flat slopes that resulted in ponding.
The Village hired H2M to design improvements to approximately 
20,000 linear feet of residential roads of widths between 25 and 
45 feet. H2M designed the realignment of the roads with higher 
slopers to address ponding, as well as rebuilt curbs and sidewalks 
to match the alignment.
Additionally, at the request of the Village, H2M included rubber 
speed humps as traffic calming devices at various locations 
throughout the project. H2M’s construction documents for the 
roadway improvements were completed on time and under budget.

Page 447

Parking Lot Improvements • 
Inc. Village of Hempstead
Hempstead, NY SERVICES  PROVIDED Survey Inspection Civil Engineering
Construction Cost: $630,000
The Village of Hempstead contacted H2M to design the improvements to a municipal parking field.
At first, the scope seemed very straightforward.  However, this 
parking field not only provided parking for local businesses, 
it also served Village Hall, the Village Police Department, and 
the local library.  The library provides many programs for young 
children and the elderly and the police station needed to maintain 
operations during construction. Therefore, maintaining safe 
access to both facilities during construction was critical.  Since 
the project scope included replacement of the entrance to the 
police station to provide ADA accessibility, alternate means of 
ingress and egress were necessary.  The project scope posed 
an extensive disruption to the normal operations of Village Hall, 
library, and police station.  To minimize the disruption, careful 
coordination with each entity was necessary during design 
to develop alternate means of access and ensure that daily 
operations were not affected.
The project included the installation of a remote payment system 
for a portion of the parking field that provided parking for the local 
commercial district, which needed to integrate with the existing 
web-based system currently in use by the Village.  Additional 
drainage facilities were installed to address nuisance flooding of 
the site. 

Page 448

Drainage & Athletic Improvements • 
Incorporated Village  
of Malverne
Malverne, NY
SERVICES  
PROVIDED
Athletic Field Design
Civil Engineering
Construction Administration
Construction Inspection
Landscape Architecture
Site Conditioning and 
Drainage 
Wetlands Mitigation 
Planting
Construction Cost: $6.5 million
The Village of Malverne hired H2M to design drainage improvements and renovations to Whelan Field and improve public 
access to Pine Stream.
Whelan Field is a 5.72-acre public park featuring two baseball 
fields, a smaller one for the Malverne Little League players and 
a larger one for pre-teens and teenagers. The fields sit near Pine 
Stream, a small tributary which connects to Mill River. The primary 
goal of the project was to construct additional floodplain storage 
for Pine Stream and install on-site stormwater detention to collect 
and treat runoff before it entered Pine Stream with funding from 
the New York State Office of Resilient Homes and Communities. 
To construct these improvements, the entire site, including both 
baseball fields, needed replacement. The Village leveraged this 
opportunity to improve the baseball fields and provide other 
enhancements to the park
After constructing the drainage improvements, H2M renovated 
both baseball fields, expanding the size of the larger field to 
meet the standard dimensions of high school baseball fields. The 
existing batting cages were also expanded, and new dugouts 
were designed with shade canopies to shield players from direct 
sunlight. The existing spectator stands were replaced with new 
seating and custom stone block terraces were designed for the 
outfield bleachers at the larger baseball field.
H2M enhanced the wetlands buffers around Pine Stream by 
establishing native riparian plantings in place of the existing invasive 
vegetation, and created openings in the buffer at several locations to 
provide scenic views and physical access to the stream.
H2M also designed a new paved parking lot and pathway system 
to provide universal access throughout the park. Fitness stations 
and educational signage, pedestrian lighting, and benches are 
placed along these new pathways. The design also features a 
new 20’ x 30’ open air pavilion overlooking a new and expanded 
dog run prioritized for large and small dogs.
AWARDS
 ♦  ACEC Diamond Award 

Page 449

Streetscape Enhancements • 
Inc. Village of 
Westhampton Beach
Westhampton Beach, NY
SERVICES  
PROVIDED
Landscape Architecture 
Civil Engineering
Drainage Improvements
Pedestrian Safety Features
Electrical Engineering
Bid Support
Construction Cost: $12.2 million
The pavement, sidewalk, and drainage systems on Main Street 
in Westhampton Beach had reached the end of their useful 
life. In turn, the Village requested H2M replace the systems 
with potential stormwater quality improvements, removal 
of overhead utility wires, and improved pedestrian safety 
features leading to the overall enhancement of Main Street.
H2M led the design for the reconstruction of approximately 2,700 
feet of roadway and sidewalks that required replacement on Main 
Street between Potunk Lane and Beach Lane. The roadway 
width was reduced to 60 feet, with 12-foot-wide travel lanes in 
each direction and double-sided on-street angled parking. The 
new roadway profile has resulted in wider, safer sidewalks with 
bulb-outs at major intersections reducing pedestrian crosswalk 
distances.  Two planted rotaries move traffic efficiently and mark 
the gateway and terminus of the Main Street corridor. 
In addition to roadway improvements, this project included a full 
replacement of the existing drainage system. The existing clay pipe 
system had been overrun with breakages and tree root intrusions. 
This reduced capacity of the existing drainage system was causing 
the Moniebogue Canal to become polluted with surface runoff. 
H2M designed a plan for the complete replacement of the existing 
drainage system, with a hydrodynamic separator, which would 
help reduce pollution in the Moniebogue Canal. Permeable pavers 
were placed in the utility strip, and hydrodynamic vortex separators 
were also included.  Structural soil was placed as a high strength, 
root penetrable base course under pavements around new street 
tree pits, to support tree root growth and mitigate compaction loads 
from pavement and pedestrians.
Per the Village’s decision to remove overhead utility wires 
between Mitchell Road and Mill Road, H2M helped coordinate with 
several utility companies.  In addition, H2M’s electrical engineers 
coordinated closely with PSEG Long Island on the location of 
approximately 7,200 feet of electrical conduit and 37 pull boxes 
and transformer concrete pads for primary service within Main 
Street. The Village’s contractor installed buried structures and 
conduits for utility use in eliminating the overhead distribution. 
Removing the overhead utility poles also eliminated the existing 
attached cobra head light fixtures, the road’s major illumination 
source. H2M landscape architects and electrical engineers 
coordinated the lighting replacement with decorative street 
lighting to provide appropriate illumination for pedestrians on 
sidewalks and drivers on the roadway. H2M also designed new 
street plantings, perennial plantings, as well as a passive park 
plaza featuring distinctive paving, planting, and seating.
AWARDS
 ♦ ACEC-NY Engineering 
Excellence Platinum Award

Page 450

Pumping Stations Rehabilitation • 
Westchester County 
Department of  
Environmental Facilities 
Yonkers, NY
SERVICES  
PROVIDED
Asbestos Survey
Bid Services
Collection System Capacity 
Analysis
Construction Administration
Construction Inspection 
Cost Estimates & Opinions
Design Engineering
Engineering Design & 
Report Estimating 
Existing Condition 
Assessment
Facility Evaluation 
Survey
Wastewater Engineering
Construction Cost: $17 million
The Westchester County Department of Environmental Facilities hired H2M to help rehabilitate the Alexander Street and 
Irvington Pumping Stations in the North Yonkers Sewer District.
The Alexander Street Pumping Station was originally constructed 
in the 1930s and was last rehabilitated in 1992. The Irvington 
Pump Station was constructed in 1976 and last saw rehabilitation 
in 2002. Both were due for an evaluation of existing conditions 
and rehabilitation. H2M assessed of the condition of each 
pumping station, including the station’s size, pumping capacity, 
electrical equipment, HVAC equipment, roofs, stairs, and odor 
control systems and made recommendations for improvements 
to meet current design standards.
The Alexander Street Pumping Station average daily flow is 
1.055 MGD with the peak hourly design flow of 3.09 MGD. The 
pump station upgrade included a new prefabricated building 
to house headworks equipment with a separate room for the 
electrical equipment necessary to support the Alexander Street 
Pump Station’s electrical independence from the North Yonkers 
Pump Station. The rehabilitation also involves upgrades to wet 
well and dry well equipment, including new dry pit submersible 
pumps, piping and associated valves; sump pump; automatic 
bar screen; odor control system; and flow/level sensors. H2M 
assessed the stairs, walkways, gratings, and rehabilitation of 
the wet well, dry well, and tunnel roofs and made repairs as 
necessary. H2M’s design also provided adequate lighting and 
mechanical ventilation in the wet well and dry well. 
The Irvington Pump Station average daily flow is 1.37 MGD with 
the peak hourly design flow of 3.86 MGD. The pump station 
upgrades include adequate lighting and mechanical ventilation 
throughout the wet well and dry well. H2M’s design included 
replacement of the stairs, exterior doors, hatches, roof, gutters, 
and leaders. These new leaders were designed to direct rainwater 
away from the building and not discharge into the wet well or 
sanitary sewer. The design also includes repointing/replacement 
of brick on the control building as necessary; paint exterior metal; 
and add new asphalt and concrete sidewalks. The existing 
underground fuel tank for the generator will be abandoned in 
place. A new 975-gallon aboveground fuel tank will be installed 
outside adjacent to the dry well, and a new Con Ed 480V electric 
service will be installed for the pump station.

Page 451

 
 
TAB 3 

Page 452

 ► Staffing Plan
PROJECT TEAM
CIVIL ENGINEERING 
 
Luis Osorio, P.E.
ELECTRICAL ENGINEERING 
Charles J. Starke, P.E.*
WATER & WASTEWATER ENGINEERING
 
James M. Vierling. P.E.*
ADDITIONAL DISCIPLINES (IF NEEDED) 
 
Structural Engineering
Mechanical Engineering
Plumbing/Fire Protection Engineering
Environmental Engineering
Architecture 
The successful completion of a project requires a diverse pool of experienced personnel capable of performing tasks within their 
area of expertise. H2M’s management and project managers are also aware that the success of any project is dependent upon 
the close cooperation required between the H2M staff and the project personnel of the Town of Granby. The proposed organization 
of personnel and resources is intended to bring together a team of professionals that can focus on project objectives as well as 
respond to unanticipated circumstances or issues. 
* - Licensed in Other States
Resumes for the above 
referenced personnel are 
provided following this page.
PRINCIPAL-IN-CHARGE
Gregory J. Levasseur, P.E.
Vice President, Windsor Office Director
PROJECT MANAGERS
Matthew R. Mohlin, P.E. Anthony W. Kim, P.E. Nicholas F. Bono, P.E.*
Vice President, 
Department Manager - Civil Engineering
Vice President, 
Department Manager - Electrical Engineering
Vice President, Discipline Director - 
Water & Wastewater Engineering
QA/QC
Michael W. Keffer, P.E., LEED AP
Senior Vice President, 
Discipline Director - Civil Engineering
1

Page 453

Education
B.S., Civil Engineering; University of Hartford
Certificate in Construction Management
Licenses/
Certifications
Professional Engineer: CT, NY, RI
H2M Project Management Training Program
Memberships
American Society of Civil Engineers (ASCE)
Water Environment Federation (WEF)
Awards
Board of Director Service Award, NYWEA
Ones To Watch, NYWEA
Mr. Levasseur brings over 20 years of engineering experience to his role as H2M’s Windsor, CT, Office 
Director. A licensed Professional Engineer and seasoned project leader, he is widely recognized for 
his technical expertise in wastewater infrastructure, including the planning, design, and contract 
administration of treatment plants, gravity sewers, low-pressure systems, force mains, and pumping 
stations. However, his value to clients and project teams extends far beyond his wastewater credentials.
As Office Director, Mr. Levasseur plays a pivotal role in the strategic growth and operational leadership 
of H2M’s Windsor office. He serves as a key client liaison and trusted advisor across a wide range 
of municipal and infrastructure projects throughout Connecticut. His deep familiarity with the state’s 
regulatory landscape, municipal priorities, and funding mechanisms allows him to anticipate client 
needs and guide teams toward practical, cost-effective solutions.
Mr. Levasseur is frequently called upon to serve as Principal-in-Charge, Technical Advisor, or QA/QC Lead 
on multidisciplinary projects—ranging from water main extensions and environmental assessments to 
zoning regulation updates, brownfield redevelopment, and more. His ability to bridge technical rigor 
with client-focused delivery makes him an asset on both proposal teams and project execution.
His leadership is grounded in responsiveness, accountability, and a commitment to quality. Whether 
supporting proposal strategy, mentoring junior staff, or representing H2M in client meetings, he brings 
a steady hand and a collaborative mindset that aligns with the firm’s mission, vision, and values.
Gregory J. Levasseur P.E.
Vice President, Windsor Office Director

Page 454

• Various School Districts Synthetic Athletic Field Projects; Various Locations, NY: Civil Engineering 
Project Manager overseeing the replacement of existing grass athletic fields with new synthetic turf 
football/soccer fields with associated drainage system improvements for the new fields for  the school 
districts of Freeport, Mount Sinai, Hewlett Woodmere, Baldwin, Island Trees, South Huntington, and 
Smithtown. 
• Dominican University New Athletic Field; Orangeburg, NY: Design of a new NCAA running track and 
synthetic turf athletic field, including diversion of a stream and drainage improvements. 
• Kings Park School District Athletic Field Upgrades and Comfort Station; Kings Park, NY: Project Manager 
for the replacement of a running track and football field with a new EPDM running track and synthetic turf 
multi-purpose field at the Kings Park High School. 
• Locust Valley School District Athletic Field Improvements; Lattingtown, NY:  Project Manager to address 
drainage improvements on the baseball field and softball field at Locust Valley High School. 
• Carle Place School District Athletic Field Replacement; Carle Place, NY:  Project Manager for the 
replacement of grass football and baseball fields with synthetic turf, including new bleachers, fencing, 
lighting, and walkways. 
• Tarrytown School District Athletic Field Upgrades; Sleepy Hollow, NY: Project Manager for the 
replacement of three multi-purpose athletic fields with synthetic turf and the reconstruction of a baseball 
infield at Tarrytown High School and Washington Irving Middle School. Both sites included drainage 
improvements and the preparation of a NOI and SWPPP. 
• Seminole Tribe of Florida Ball Field Renovations; Immokalee, FL: Working with the Seminole Tribe of 
Florida in Immokalee to design the renovation of athletic facilities as a subconsultant to LTG Sports 
Turf One. The project includes renovation of existing facilities: ball field, concession/restroom building, 
dugouts, press box, and bleachers, as well as the addition of a new north ball field. 
• Town of North Hempstead Ball Field Park Complex; Port Washington, NY:  Project Manager for the 
development of new athletic fields and park facilities at Manhassett Valley Park. 
• New York City Housing Authority (NYCHA) New Athletic Field; Bronx, NY:  Design of a new, natural grass 
baseball field and exercise track at Throggs Neck Houses in the Bronx.  New site amenities incorporated 
into the design include equipment storage shed, bleachers, electronic scoreboard, dugouts, and drinking 
fountain. 
• Inc. Village of Malverne Drainage Improvements and Baseball Field Renovations; Malverne, NY: 
Project Manager for drainage improvements and creation of new floodplain storage in a Village park. To 
increase floodplain storage in the area surrounding Pine Stream, approximately five acres of parkland 
was re-graded and lowered. This also allowed for two baseball fields to be redeveloped using current 
design standards. Additional stormwater management controls were included to address stormwater 
quality and quantity. 
• Town of Clarkstown New Baseball Field; Clarkstown, NY: Project Manager for the design of a new 
Little League Field at Germonds Park.  The baseball field was designed to accommodate regional 
championship games for the annual Little League World Series tournament. 
Education
B.S., Civil Engineering;
Polytechnic University
Licenses/
Certifications
Professional Engineer: NY, CT, FL
Memberships
American Society of Civil Engineers
American Public Works Association
Honors/Awards
American Society of Civil Engineers, 
Student Chapter, Meritorious Service, 1989
Mr. Mohlin has more than 30 years of civil engineering experience. His responsibilities include the 
management of all civil engineering design projects.  He also served as a project manager for multiple 
projects that include the analysis and design of roadways, parking lots, paving; site grading; drainage 
and sanitary systems, flood control systems, parks and recreational facilities, irrigation systems, 
bulkheads and docks, and the preparation of designs, site plans, specifications, and reports.  He is 
Project Manager on numerous projects, some of which are listed below.
Selected project experience
Vice President, Civil Engineering Department Manager
Matthew R. Mohlin P.E.

Page 455

• Eastport-South Manor Central School District Bond Referendum; Eastport and Manorville, NY: Civil 
Engineer for the development and execution of a $90 million bond referendum supporting District-wide 
capital improvements. Led planning, documentation, and community facing materials for upgrades, 
including District-wide security booths; a 200,000 square foot standing seam metal roof replacement at 
the High School; new synthetic turf multipurpose, baseball, and softball fields with track improvements; a 
7,000 square foot two story High School addition; and extensive interior renovations encompassing a new 
café, esports room, technology labs, home and careers spaces, makerspaces, STEAM and art rooms, 
playgrounds, mechanical system upgrades, and ADA compliant toilet room renovations. Following voter 
approval, supported the program through two construction phases, developing construction documents 
and providing construction administration for Phase 1. Phase 2 construction is ongoing. 
• Hudson River Park Trust (HRPT) Sports Field Lighting Upgrades; New York, NY: As part of an on-
call contract with the HRPT, providing design and construction administration support services for 
replacement of the sports field lighting at Hudson River Park Trust’s Pier 40. H2M’s design solution 
includes the removal of select light poles while others will remain in place. A cluster of new fixtures was 
designed for the poles that are remaining. Although the total number of fixtures per pole was increased, 
the overall weight of the new cluster was verified and will not exceed the allowable gravity load of the 
existing light poles. At the locations where light poles will be removed, the exposed holes will be patched 
per the structural engineer’s design details.
• SUNY Purchase College Visual Arts Classroom Electrical Upgrades; Purchase, NY: Designed the 
installation of additional electrical wiring devices and equipment in a number of classrooms (~40) in the 
Visual Arts Building. The classroom electrical device layout was revised to allow for flexibility and multi-
functional use of the classrooms. Local electrical distribution systems were reviewed for the necessary 
powering and circuiting of the additional devices. 
• SUNY Stony Brook Storage Warehouse Building; Stony Brook, NY: Lead Electrical Engineer for the 
design of a new warehouse to store dry good and miscellaneous University property. Designing and 
sizing new electrical service throughout warehouse and lighting, as well as coordinating connection to 
electrical utilities. 
• New York Institute of Technology Salt Shed and Site Improvements; Old Westbury, NY: Designed 
electrical systems for a new pre-engineered salt shed building to accommodate 60 tons of salt and a 
new pre-engineered canopy over the fuel dispenser island.
• Syosset Central School District District-Wide AC Upgrades; Syosset, NY: Electrical Engineer for a $9.3 
million effort to provide air conditioning in most classrooms throughout the District, including seven 
elementary schools, one middle school, and one high school. 
• City University of New York (CUNY) Lehman College Leonard Lief Library HVAC Upgrades; Bronx, NY: 
Low Voltage Engineer for a complete interior redesign of the Library.  Replaced all light fixtures with 
LEDs for energy-efficiency; and incorporated stepped dimming, occupancy, and daylight sensors to 
conserve energy.  
• Locust Valley School District; Locust Valley, NY: Design of an electrical service upgrade with the 
replacement of a 2,000 Amp (120/208 Volt) switch board at the Locust Valley High School.  The 
replacement of the switch gear included the coordination and tie-in to the main 2,500 Amp (277/480 Volt) 
service equipment located in the adjacent Locust Valley Middle School.  Design included the phasing 
and coordination of the electrical shutdown required to be conducted in the High School Building.  
Generators were provided to specific areas in the building that required power during the shutdown. 
Education
B.S., Electrical Engineering;                          
Polytechnic University
Licenses/
Certifications
Professional Engineer: NY, NJ, CT, FL, VA
Project Management Training Program, H2M
H2M Mentoring Program Graduate, Mentee
Mr. Kim is an electrical engineer with more than 15 years of experience. His responsibilities include the 
design of power distribution, new electrical services and service upgrades, emergency generators and 
systems, electric vehicle (EV) charging systems, interior and exterior lighting, fire alarm systems, CCTV 
and access control systems, and security alarm systems. He is also involved in shop drawing review and 
construction phase services.  Mr. Kim is proficient in Revit MEP and has developed the electrical portion 
of the building information models (BIM) for key projects.
Selected project experience
Vice President, Department Manager - Electrical Engineering
Anthony W. Kim P.E.

Page 456

• Nassau County DPW Bay Park Sewage Treatment Plant Permanent Hot/Chilled Water Piping System; 
East Rockaway, NY: As Project Manager, led the design team’s progress by the plumbing, mechanical, 
civil, electrical, and structural disciplines. The purpose of this project is to provide new site hot and chilled 
water piping systems which provide heating and cooling to the numerous plant operations and treatment 
buildings on site. The existing piping has experienced failures over the years and temporary repairs have 
been constructed. A completely new system of piping would be provided to allow for the demolition of the 
existing. The project involved a detailed re-evaluation of the 30% preliminary design approach due to all 
the other projects that had been initiated at the Bay Park Facility since the 30% design was completed 
by the owner. The preliminary disinfection concept was no longer feasible, and a new hot/chilled water 
piping routing was established by H2M during this course of this project. 
• Nassau County DPW Glen Cove Wastewater Treatment Plant Settling Tank Improvements; Glen Cove, 
NY: Senior Project Engineer for the design and construction administration of the primary and secondary 
settling tank improvement project at the Glen Cove Wastewater Treatment Plant.  Responsible for 
coordinating the preparation of detailed design plans and specifications for the complete replacement 
of the secondary settling tanks, rehabilitation of the primary settling tank clarifiers, replacement of the 
primary settling tank clarifier drives and complete replacement of the primary forward flow 24-inch diameter 
isolation plug valves located in the basement of the Plant headworks building.  The design tasks specifically 
included the preparation of a technical design report, refined project construction cost opinions throughout 
the duration of the design, a PLA feasibility study, evaluation of existing facility record document information 
and use of laser scan survey information to prepare accurate design documents. Also responsible for the 
review and comment of all technical shop drawing submissions during the construction phase of the project 
and coordination with the client’s construction manager.  Provided recurring project updates to the client at 
monthly progress meetings throughout the duration of design and construction. 
• Nassau County DPW Glen Cove Wastewater Treatment Plant Sludge Dewatering Improvements; 
Glen Cove, NY: Senior Project Engineer for the design of sludge dewatering facility improvements 
at the Glen Cove Wastewater Treatment Plant. Responsible for the coordination of detailed design 
plans and specifications for the demolition, rehabilitation and process improvements to the existing 
abandoned DAF building located at the Plant. Design tasks included detailed evaluation of new process 
equipment and coordination with equipment manufacturer’s to include the re-use and reassembly of 
existing client-owned belt filter press dewatering equipment from the Bay Park Sewage Treatment Plant 
to the Glen Cove Wastewater Treatment Plant. Responsible for the preparation of a technical design 
report, refined project construction cost opinions throughout the duration of the design, a PLA feasibility 
study, evaluation of existing record document information for the abandoned DAF building and existing 
belt filter press equipment. Also responsible for the review and comment of all technical shop drawing 
submissions during the construction phase of the project and coordination with the client’s construction 
manager.  Providing recurring project updates to the client at monthly progress meetings throughout the 
duration of the project.
• Suffolk County DPW Sewer Capacity Study; Suffolk County, NY: As Project Engineer, evaluated all seven 
areas of interest for sanitary sewer collection, conveyance and treatment systems.  Identified nearby 
existing treatment facilities with close proximity to each area as well as vacant/municipal owned land in 
the vicinity of each area and determined the most feasible treatment option based on available capacity, 
complexity and associated costs. Determined the most feasible collection and conveyance system 
Education
B.S., Environmental Engineering; State 
University of New York at Buffalo
Licenses/
Certifications
Professional Engineer: NY, NJ
Project Management Training Program, H2M
Memberships
Water Environment Federation
Mr. Bono has more than 20 years of experience.  His responsibilities include engineering design and 
preparation of bid ready plans and specifications, contract administration/inspection services and 
project management and subconsultant coordination on sanitary wastewater projects consisting of 
gravity sewer collection systems, low pressure sewer collection systems, pumping stations, force 
mains and sanitary treatment systems. Mr. Bono is also experienced in the preparation of engineering 
feasibility studies, map and plans and engineering design reports to establish new sewer districts and 
identify potential out-of-district connections to existing sewer districts to improve environmental, 
economic and social conditions in un-sewered areas.
Selected project experience
Vice President, Discipline Director -                                                
Water & Wastewater Engineering
Nicholas F. Bono P.E.
layouts based on the accepted treatment facility location and prepared overall project cost opinions. 
Projected project phasing plans and schedules and evaluated cost impacts to “typical” property owners 
to assist in the economic analysis portion of the sewer capacity analysis. Attended public meetings 
with stakeholders to present the findings of the study, field questions and incorporate the needs of the 
community stakeholders into the final findings reports. 

Page 457

• Village of Westhampton Beach Main Street Improvements; Westhampton Beach, NY: Engineer of Record 
overseeing the engineering design and reconstruction of approximately 2,700 feet of the Village’s Main 
Street corridor, including replacement of all drainage, pavement, curbs, sidewalks, street lighting, and 
street trees and the inclusion of traffic calming features. This project involved extensive coordination 
with utility companies to facilitate the conversion of all overhead utilities to underground. The design 
included permeable pavers to reduce stormwater runoff and a stormwater treatment structure upstream 
of a drainage outfall discharging to surface waters for stormwater quality purposes. 
• 174 Power Global Battery Energy Storage System Development; Queens, NY: Project Manager for 
a 100 MW battery energy storage project in New York City for 174 Power Global. Overseeing the 
interconnection of a 100 MW battery energy storage facility to a 138kV transmission system. As the 
Engineer of Record, assisted the developer in assembling existing subsurface utility mapping within 
the interconnect corridor, evaluating existing vertical and horizontal constraints, planning the alignment 
of the interconnect, coordinating with the construction team on staging work, and overseeing the 
preparation of construction documents. 
• Catholic Health Systems St. Joseph Hospital Major Modernization; Bethpage, NY: Project Manager 
for engineering services associated with the modernization of St. Joseph Hospital. Responsible for 
land surveying, civil/site engineering, site electrical and plumbing engineering, landscape architecture, 
SEQRA support, and Environmental Site Assessments (ESAs) Phase I and II.
• Bethpage Golf Group Driving Range Improvements; Bethpage, NY: Project Manager responsible for site 
plan design services associated with the driving range improvements. Designed site features, grading, 
and drainage as needed to facilitate upgrades. 
• PSEG Long Island FEMA Hazard Mitigation Program; Long Island, NY: Permitting Technical Advisor 
responsible for providing technical guidance and information to design engineers preparing highway 
work permit applications to State, County, Town, and Village officials for underground electrical work 
within the public right-of-way. Conducted meetings with New York State Department of Transportation 
(NYSDOT) officials in presenting proposed underground circuits and facilitating approval of PERM32 
permits. 
• New York State Office of Parks, Recreation and Historic Preservation (NYSOPRHP) Hempstead Lake 
State Park Environmental Education and Resiliency Center and Park Enhancements; West Hempstead, 
NY: Engineer of Record for the site engineering design for the Environmental Education and Resiliency 
Visitor Center at Hempstead Lake State Park. This project was part of the Governor’s Office of Storm 
Recovery’s Living with the Bay project. The site was designed with a stormwater detention system to 
ensure enhanced stormwater quality prior to runoff reaching Hempstead Lake. Expanded parking and 
ADA access between the parking lot, Education Center, and access to lake trails and waterfront amenities 
were included in the site design. Landscaping includes native vegetation and low maintenance species. 
A sanitary sewage pumping station was designed to route all sanitary flow to an existing collection 
system and existing treatment facility. 
Education
M.A., Public Administration; George 
Mason University
B.S., Civil Engineering; Virginia Tech
Licenses/
Certifications
Professional Engineer: NY, NJ, CT, FL,            
MA, PA, VA
LEED Accredited Professional, USGBC
Dale Carnegie Leadership Training for 
Managers
Professional Liability Education Program, 
DPIC
PSMJ A/E/C Project Management Bootcamp 
Designated Plans Examiner  
Memberships
American Society of Civil Engineers
Presentations
Best Practices for a Successful NYSDEC 
Audit of a Village MS4 Stormwater 
Program, Nassau County Village Officials 
Association, October 2012
Mr. Keffer is a professional engineer with more than 38 years of civil engineering and land development 
experience. As Director of the Civil Engineering Division, he manages the civil engineering, land 
surveying, landscape architecture, environmental planning, and GIS practice areas within H2M. 
Mr. Keffer is also involved in site development projects, site plans, municipal approvals, regulatory 
permitting, public hearing testimony, through construction administration.  He works on a variety of 
private and public projects including commercial, residential, retail, municipal, hotel, fire and K-12 
facilities.  He coordinates the efforts of all involved disciplines, engineering design staff, and oversees 
project budgets and schedules. Mr. Keffer also assists as Village Engineer in the communities of Bayville 
and Great Neck.  In this role, he provides  the technical review on site development applications for 
Village Boards’ of Trustees, Planning Board, and Zoning Board.  In addition, he represents these Boards 
as Village Engineer during public hearings.
Selected project experience
Senior Vice President, Discipline Director - Civil Engineering
Michael W. Keffer P.E., LEED AP

Page 458

Education
B.S., Civil Engineering; University of 
Javeriana, Colombia
Licenses/
Certifications
Professional Engineer: NY, CT, FL
Luis Osorio P.E.
Discipline Engineer - Civil Engineering
Mr. Osorio is a professional engineer with more than 20 years of experience in the design and 
management of civil engineering projects on Long Island and in New York City. His experience includes 
roadway, drainage, and site and recreational facility projects. Mr. Osorio is proficient in Oracle Primavera, 
Procore, MicroStation, StormCAD, InRoads, Bluebeam Revu, Smartsheet, Microsoft Office, SewerGems, 
and SpecLink.
Selected project experience
• Town of Oyster Bay Construction of Pickleball Courts; Massapequa, Farmingdale, and Woodbury, NY: 
Project Manager/Senior Civil Engineer for the design of pickleball court facilities at Field of Dreams Park, 
Allen Park, and Syosset-Woodbury Community Park. Work included grading, drainage and site design, 
construction drawings, cost opinions, and project specifications. 
• Town of Oyster Bay Construction of Pickleball Courts at B-21; Bethpage, NY: Project Manager/Senior 
Civil Engineer/Construction Manager for the construction of three Pickleball Courts at the Parklet on 
Lenox Avenue in Bethpage. Project included construction of new base and asphalt surface, court 
appurtenances, coating, and fence improvements. 
• Town of Oyster Bay Reconstruction and Repair of Tennis Courts; Oyster Bay, NY: Project Manager/
Senior Civil Engineer/Construction Manager for the reconstruction of 18 outdoor tennis courts located 
at various Town of Oyster Bay parks. The project consisted of studying the existing conditions and 
formulation of different approaches for court rehabilitation. Construction included tennis court base 
stabilization, asphalt resurfacing, access repairs, coating, and more than 4,500 linear feet of crack 
repairs. 
• Sportime Tennis Facility Renovation; Randall’s Island, NY: Senior Civil Engineer for the renovation of 
the Sportime Facility at Randall’s Island. Responsible for site and utility improvements and grading 
design.  The work included the alteration and addition of four new courts to the existing facilities, new 
construction of an indoor tennis building with a battery of six courts and four new outdoor U-10 courts. 
• United States Tennis Association (USTA) Tennis Courts Reconstruction; Corona, NY: Senior Engineer 
for the civil design to renovate 12 public tennis courts in Flushing Meadow-Corona park. Work for 
this $1.2 million project included new wet utilities, pavement design, storm water treatment, and site 
appurtenances. 
• USTA Billie Jean King National Tennis Center Renovation; Flushing, NY: Senior Civil Engineer for 
the renovation of this 42-acre facility in Flushing Meadow Corona Park. Services included grading, 
utility, pavement, structural and cost engineering for the production of schematic designs, construction 
documents, specifications, and estimates for the following sub-projects: South Campus, Armstrong 
Stadium, Grandstand Stadium, Ticket Office Relocation, and West Side Redevelopment. 
• City of New Rochelle Department of Public Works Drainage Improvements at City Park; New Rochelle, NY 
Project Manager and Engineer of Record for the design of storm improvements at five different locations 
around the City’s park. Solutions include a 200,000 cubic feet detention tank, new storm structures, and 
pipe upsizing. 
• Westchester County Department of Public Works and Transportation Drainage Improvements at 
Westchester County Center; White Plains, NY: Project Manager for the design of stormwater solutions 
to alleviate the center from yearly flooding. Improvements included a mechanized flood gate, concrete 
flood barrier, and the redevelopment of the facility’s drainage system including the installation of tide 
valves and a pump station. 
• Town of Oyster Bay Parking Field Improvements; Oyster Bay, NY: Project Manager/Senior Civil 
Engineer for the design of improvements to reconstruct the existing O-3 parking field to address issues 
of boundary definition, access, drainage, pavement condition, and lighting. 
• Village of Malverne Improvements to Ackley Avenue Area; Malverne, NY: Project Manager for the 
design of roadway improvements in the Village of Malverne. The scope of work includes full-depth 
reconstruction of the existing pavement, replacement of sod, curbs, gutters, concrete aprons/sidewalks, 
handicap ramps, and road castings; structural repairs; and cleaning of the existing drainage system. 

Page 459

• Farmingdale Union Free School District Howitt Middle School Aquatic Center and Athletic Field 
Complex; Farmingdale, NY: Senior Project Engineer responsible for electrical design for the District’s 
new Aquatic Center. Prepared electrical plans and specifications for the design of electrical power 
systems, pool equipment power and control, HVAC equipment power and control, lighting, fire alarm 
system, information technology network and system, audiovisual system, public address system, CCTV, 
and security system for the Aquatic Center. The center consists of a competition pool, public pool, 
competition locker rooms, public locker rooms, pool equipment room, and miscellaneous office and 
storage areas. Also designed site lighting for the construction of a new synthetic turf multi-purpose field 
striped for various sports teams.
• East Islip Union Free School District High School and Middle School Athletic Field Upgrades; Islip 
Terrace, NY: Senior Project Engineer responsible for exterior lighting plans and specifications as part of 
upgrades to the Middle School and High School athletic fields. 
• Carle Place Union Free School District High School Athletic Fields Renovation; Carle Place, NY: Project 
Engineer responsible for lighting design for renovation of the High School baseball and football fields. 
Both fields were outfitted with new stadium lighting. Due to the proximity to adjacent residential properties, 
the design incorporated shields to minimize the amount of lighting that left the school property. 
• East Islip Union Free School District District-Wide Security Vestibules; Islip Terrace, NY: Senior Project 
Engineer responsible for electrical plans and specifications for new secure entrance vestibules at seven 
District buildings, as well as the replacement of several exterior doors. The scope also included lighting 
design. 
• East Islip Union Free School District High School Locker Room Renovation; Islip Terrace, NY: Senior 
Project Engineer responsible for renovations to the existing High School locker rooms, showers, 
and toilets, totaling approximately 8,500 square feet. HVAC, plumbing, and electrical systems were 
completely replaced. New rooftop ventilation and exhaust systems were provided, minimizing ductwork 
sizes to maximize ceiling heights in the existing locker room areas. Skylights were replaced and energy 
efficient daylight sensors were used to take advantage of natural light and control light levels. 
• Dormitory Authority of the State of New York (DASNY) CUNY Bronx Community College Pool 
Rehabilitation; Bronx, NY: As Project Engineer, prepared electrical plans and specifications for design 
and modification of the existing electrical power systems, pool equipment power and control, HVAC 
equipment power and control, lighting, and fire alarm system for the Bronx Community College 
competition pool and associated pool equipment room. 
• Mineola Public Schools High School AC Upgrades; Garden City Park, NY: Senior Project Engineer 
responsible for the design of electrical systems associated with air conditioning upgrades at Mineola 
High School. 
• Carle Place Union Free School District Middle/High School Library Renovation; Carle Place, NY: Project 
Engineer responsible for electrical plans and specifications for renovation of the Middle/High School 
library. The scope included electrical power and lighting, as well as upgrades to fire alarm detection 
systems. 
Education
B.S., Electrical and Computer Engineering; 
New York Institute of Technology
Licenses/
Certifications
Professional Engineer: NY, NJ, FL
Dale Carnegie Training Program
H2M Project Management Training Program
Mr. Starke is an electrical engineer with 15 years of experience providing electrical design for water, 
wastewater, and industrial projects. As H2M’s Assistant Department Manager of Electrical Engineering, he 
is responsible for leading a team of staff in the execution of high-quality electrical designs. Mr. Starke’s 
areas of expertise include power distribution design, new electrical services and service upgrades, 
motor control centers, programmable logic controls (PLC), emergency generators and systems, interior 
and exterior lighting, fire alarm systems, CCTV and access control systems, and security alarm systems. 
Selected project experience
Assistant Vice President, 
Assistant Department Manager - Electrical Engineering
Charles J. Starke P.E.

Page 460

• Village of Westhampton Beach Phase 1 Sewer Collection and Conveyance System; Westhampton, 
NY: Project Engineer responsible for the design of over 2,000 linear feet of gravity sewer, 15,000 
linear feet of sanitary force main and two pump stations to convey sanitary sewerage flow from the 
Village of Westhampton Beach Main Street business district to an existing County Sewage Treatment 
Plant. Prepared construction documents for all collection and conveyance infrastructure, including the 
evaluation of mechanical equipment, pump station facility layout and piping, utility upgrades and pump 
station site plans. Provided construction administration and management services for construction 
including shop drawing review, review of payment requests, and coordination of project meetings. 
• City of New Rochelle Sanitary Sewer Evaluation; New Rochelle, NY: Project Engineer and Lead 
Designer responsible for the evaluation and design of 20,000 linear feet of gravity sewer enhancements 
in downtown New Rochelle, NY. The project required that the existing gravity sewers, some of which 
have been in service for 100 plus years, be upsized to accommodate flows from future developments. 
Responsibilities included preparation of an engineering design report, utility coordination, preparation of 
detailed design documents, and design during construction services. Created hydraulic models for each 
phase of development that was used to schedule and budget future sewer improvements. Provided City 
with cost estimates, schedule, and future flow projects for planning of improvements. 
• Suffolk County Sewer District No. 6 Kings Park Downtown Sewer Extension; Kings Park, NY: 
Project Manager responsible for the preparation of bid ready construction documents, construction 
administration, and inspection services for a multi-prime contract consisting of a new sanitary pump 
station, 12,000 linear feet of gravity sewer, and 7,300 linear feet of force main. Responsibilities included 
coordination and permitting with NYSDOT, public outreach, management of inspection staff, and 
management of contracts.
• Suffolk County Sewer District No. 18 Zone IV Sewer Extension; Happauge, NY: Project Manager/Lead 
Designer responsible for the design of a Zone IV collection and conveyance system for the Happauge 
Industrial Park. Responsible for design of pump station, gravity collection system and force main. 
Coordinated design with utilities, including close proximity to high voltage oil static electric transmission 
line. Assisted County with land acquisition for the pump station site.
• Westchester County Department of Public Works, McGregory Brook Relief Sewer; Peekskill, NY: Senior 
Project Engineer for the evaluation of an 18-inch diameter trunk sewer segment with known capacity 
issues. Provided assistance with hydraulic modeling of existing conditions and modeling of alternatives.
• Village of Patchogue Sewage Treatment Plant 1.2 MGD Facility Plan; Patchogue, NY: Project Engineer 
responsible for writing the facility plan for the upgrade of a 0.8 MGD integrated fixed film and activated 
sludge (IFAS) treatment plant to 1.2 MGD. Evaluated the capacity of all treatment system components 
including the headworks, grit chamber, pump stations, process tanks, clarifiers, UV disinfection, 
membrane sludge thickener, and sludge holding tank. Prepared the hydraulic profile based on peak 
projected flow rate and verified the mass balance through the treatment plant to meet the facilities permit 
requirements.
• Village of Patchogue River Sewers; Patchogue, NY: Project Engineer responsible for the design of 
approximately 30,000 linear feet of low-pressure sewer system (LPSS) as part of a project to connect 
approximately 500 parcels to the existing sewage treatment plant in the Village of Patchogue, NY. 
Evaluated the system hydraulics including layout and sizing of the sewer network, and calculated 
projected flows. 
Education
B.S., Bioengineering; Binghamton University 
H2M Project Management Certification 
Licenses/
Certifications
Professional Engineer: NY, FL
Memberships
NY Water Environment Federation
Awards
LIBN 30 under 30 (2021)
Select Society of Sanitary Sludge Shovelers 
(SSSSS) – Bronze Shovel (2021)
New York Water Environment Association, 
Inc. (NYWEA) - Long Island Chapter - Rising 
Star (2023)
Mr. Vierling has more than 10 years of experience in the planning, engineering design, and design during 
construction services for sanitary wastewater projects, including gravity sewer collection systems, low 
pressure sewer collection systems, pumping stations, force mains, and sanitary treatment systems. 
His responsibilities include the preparation of plans, specifications, evaluation of piping and pumping 
systems, modeling of collection systems, feasibility studies, and engineering design reports. He is also 
responsible for construction administration services, including review of contractor submittals, bid 
evaluation, and review of schedules.
Selected project experience
Associate, 
Discipline Engineer - Water & Wastewater Engineering
James M. Vierling P.E.

Page 461

 
 
TAB 4 

Page 462

Page 7 of 7 
 
 
 
APPENDIX A 
 
Cost Proposal 
 
 
Name of Engineering Firm: ___________________________________________________ 
 
 
Services Needed 
 
 
On-Call Engineering and Related Services 
 
Please indicate your firm’s hourly fees over the five-year period of the contract 
 
Billing Category    Hourly Billing Rate 
 
Project Manager    ________________ 
Chief Engineer    ________________ 
Engineer     ________________ 
Technician Support    ________________ 
Clerical/Researcher    ________________ 
Other      ________________ 
 
Other Expenses (if applicable): 
 
 
 
 
 
 
Identify any other categories and costs required to provide Engineering and On-Call 
services that are not included above:  
 
________________________________________________________________________ 
________________________________________________________________________ 
________________________________________________________________________ 
H2M Architects & Engineers, Inc. 
Please see attached. 

Page 463

Municipal
2026 B Hourly Rate Schedule
Classification Rate Classification Rate
ADMINISTRATIVE ASSISTANT TO THE COO $126.00 PROJECT COORDINATOR 2 $110.00
ADMINISTRATIVE SUPPORT PROFESSIONAL $104.00 PROJECT DESIGNER 1 - ARCH. $150.00
ASSISTANT DEPARTMENT MANAGER - COATINGS $150.00 PROJECT DESIGNER 1 - ENG. $150.00
ASSISTANT DEPARTMENT MANAGER - ENG $253.00 PROJECT DESIGNER 2 - ARCH. $168.00
ASSISTANT DEPARTMENT MANAGER-SCI $197.00 PROJECT ENGINEER 1 $168.00
ASSISTANT ENGINEERING MANAGER $251.00 PROJECT ENGINEER 2 $190.00
ASSISTANT PROJECT COMPLIANCE MANAGER $132.00 PROJECT ENVIRONMENTAL PLANNER 2 $145.00
ASSISTANT PROJECT MANAGER $177.00 PROJECT LANDSCAPE ARCHITECT 2 $156.00
ASSISTANT STUDIO DIRECTOR $248.00 PROJECT SCIENTIST 1 $145.00
BIM / CAD PROGRAM MANAGER $156.00 PROJECT SCIENTIST 2 $156.00
BIM/CAD STAFF DESIGNER 1 $102.00 PROJECT SURVEYOR 2 $154.00
CAD TECHNICIAN 2 $121.00 RESIDENT ENGINEER $242.00
CHIEF EXECUTIVE OFFICER $259.00 SAFETY MANAGER $213.00
CHIEF OPERATING OFFICER $259.00 SR. ADMIN SUPPORT PROFESSIONAL $133.00
CHIEF GROWTH AND DEVELOPMENT OFFICER $259.00 SR. ARCHITECT 1 $207.00
CHIEF PROJECT PERFORMANCE OFFICER $259.00 SR. ARCHITECT 2 $230.00
COATINGS INSPECTOR 1 $122.00 SR. ARCHITECT 3 $253.00
COATINGS INSPECTOR 2 $145.00 SR. BIM/CAD SPECIALIST 1 $133.00
CONSTRUCTION ADMINISTRATOR $179.00 SR. BUSINESS DEVELOPMENT SPECIALIST 1 $204.00
CONSTRUCTION INSPECTOR 1 $127.00 SR. BUSINESS CONSULTANT 1 $217.00
CONSTRUCTION INSPECTOR 2 $145.00 SR. CAD TECHNICIAN 1 $127.00
CONSTRUCTION INSPECTOR 3 $161.00 SR. CAD TECHNICIAN 2 $145.00
CORPORATE HEALTH AND SAFETY MANAGER $174.00 SR. COATINGS INSPECTOR 1 $179.00
DEPARTMENT MANAGER - COATINGS SERVICES $259.00 SR. CONSTRUCTION INSPECTOR 2 $207.00
DEPARTMENT MANAGER - ENG $259.00 SR. CONSTRUCTION INSPECTOR 1 $190.00
DEPARTMENT MANAGER-ENV PLAN $254.00 SR. DESIGNER 1 - ENG. $184.00
DEPARTMENT MANAGER - SCI $259.00 SR. DESIGNER 1-ARCH $179.00
DEPARTMENT MANAGER - SURVEY $259.00 SR. DISCIPLINE SCIENTIST $225.00
DEPUTY DISCIPLINE DIRECTOR $259.00 SR. ENVIRONMENTAL TECHNICIAN 1 $144.00
DEPUTY ENGINEERING DIRECTOR $259.00 SR. GIS SPECIALIST 1 $164.00
DEPUTY MARKET DIRECTOR $259.00 SR. GIS SPECIALIST 2 $185.00
DIRECTOR OF ENGINEERING $259.00 SR. DISCIPLINE ENGINEER $259.00
DIRECTOR OF GIS SERVICES $259.00 SR. INTERIOR DESIGNER 1 $202.00
DIRECTOR OF OPERATIONS $259.00 SR. LANDSCAPE ARCHITECT $230.00
DIRECTOR OF PLANNING $259.00 SR. PROJECT ARCHITECT 1 $197.00
DIRECTOR OF QA/QC $259.00 SR. PROJECT ARCHITECT 2 $207.00
DISCIPLINE DIRECTOR $259.00 SR. PROJECT CONTROLS SPECIALIST 2 $219.00
DISCIPLINE ENGINEER $242.00 SR. PROJECT DESIGNER 1 $190.00
DISCIPLINE SCIENTIST $191.00 SR. PROJECT DESIGNER 2-ARCH $197.00
DOCUMENT CONTROL MANAGER $133.00 SR. PROJECT DOCUMENT CONTROL SPECIALIST $139.00
ENVIRONMENTAL TECHNICIAN 1 $88.00 SR. PROJECT INTERIOR DESIGNER 1 $202.00
ENVIRONMENTAL TECHNICIAN 2 $88.00 SR. PROJECT ENGINEER 1 $219.00
EXECUTIVE ASSISTANT $207.00 SR. PROJECT ENGINEER 2 $230.00
FIELD SUPERVISOR - COATINGS $184.00 SR. PROJECT SCIENTIST 1 $179.00
MANAGER OF CONSTRUCTION INSPECTION $219.00 SR. PROJECT SCIENTIST 2 $197.00
MANAGER OF CONSTRUCTION INSPECTION, MELVILLE $197.00 STAFF ENGINEER 2 $150.00
MARKET DIRECTOR $259.00 STAFF DESIGNER 1 $127.00
MARKET SPECIALIST $259.00 STAFF ENGINEER 1 $133.00
OFFICE DIRECTOR $259.00 STAFF DESIGNER 2 $133.00
PLANT OP & COMPL MANGR $250.00 SR. PROJECT SURVEYOR 2 $207.00
PRACTICE LEADER/MANAGER - ENG $259.00 STAFF ENVIRONMENTAL PLANNER 2 $116.00
PRACTICE LEADER/MANAGER - LA $259.00 STAFF GIS SPECIALIST 2 $116.00
PRACTICE LEADER/MANAGER - PLAN $259.00 STAFF INTERIOR DESIGNER 1 $100.00
PRACTICE LEADER/MANAGER - SCI $259.00 STAFF SCIENTIST 1 $116.00
PRACTICE LEADER/MGR - ARCH $259.00 STAFF SCIENTIST 2 $127.00
PRINCIPAL MARKET DIRECTOR $259.00 STAFF SURVEYOR 1 $99.00
PRINCIPAL OFFICE DIRECTOR $259.00 STAFF SURVEYOR 2 $116.00
PROGRAM MANAGER $259.00 STAFF PLANNER 1 $99.00
PROJECT ARCHITECT 1 $161.00 STUDENT INTERN $76.00
PROJECT ARCHITECT 2 $174.00 STUDIO DIRECTOR $259.00
PROJECT BIM/CAD ENGINEER 1 $159.00 TECHNICAL ADVISOR-DIR $259.00
PROJECT CONTROLS SPECIALIST 1 $145.00 TECHNICAL ADVISOR-ENG $259.00
PROJECT COORDINATOR 1 $92.00 TECHNICAL DIRECTOR-ARCHITECTURE $259.00
1. Rates updated annually in January.
2. When employees are part of the survey crew working on projects where we
are required to pay Prevailing Wage Rates, these rates don't apply.  Different 
rates will be provided in these circumstances.

Page 464

1
Contract Reservations 
H2M reserves the right to negotiate reasonable insurance, liability, 
and claims provisions that are consistent with industry standards 
and the standard of professional care applicable by law.
 ► Contract Reservations

Page 465

ARCHITECTURE • CIVIL •  CONSTRUCTION • ELECTRICAL • ENVIRONMENTAL • FIRE PROTECTION • FORENSIC • GEOLOGY • GIS • INTERIOR DESIGN • LANDSCAPE ARCHITECTURE • LAND SURVEY • MECHANICAL • PLUMBING • PLANNING • SOLID WASTE • STRUCTURAL • SUSTAINABLE DESIGN • WASTEWATER • WATER         *ENTERPRISE CAPABILITIES
h2m.com
BUILDING COMMUNITIES SINCE 1933

Page 466

Page 467

Page 468

Page 469

Page 470

Page 471

Page 472

Page 473

Page 474

Page 475

Page 476

Page 477

Making Sustainability Happen
Proposal
Professional Engineering Services 
Prepared For: 
Town of Granby, CT
RFQ No: 141.051644.00001
July 24, 2026

Page 478

SLR International Corporation 
 
99 Realty Drive, Cheshire, Connecticut, 06410 
 
   
 
July 24, 2026 
Mr. Mike Walsh, Town Manager 
Town of Granby 
15 North Granby Road 
Granby, CT 06035 
SLR Project No.: 141.051644.00001 
RE: Request for Proposal – Professional Engineering Services 
Dear Mr. Walsh,  
 
On behalf of SLR International Corporation (SLR), we are pleased to submit our proposal and qualifications to 
the Town of Granby for engineering services for the Replacement of the Athletic/Running Track and adjacent 
Baseball and Softball Fields at the High School/Middle School Complex and Engineering Services tasks 
associated with capital infrastructure at Salmon Brook Park. Our team is enthusiastic about the opportunity to 
help enhance the school’s athletic infrastructure for its student-athletes and the broader community. 
When reviewing our submittal, we respectfully highlight the following: 
 
• SLR is a multidisciplinary consulting firm and a recognized leader in the design of state-of-the-art 
outdoor athletic facilities across New England for more than 30 years. 
• We have recently completed similar renovation projects at: 
o Lyme-Old Lyme High School 
o Stamford High School 
o Middletown High School 
o Westfield High School (Westfield, MA) 
 
Our project team brings decades of experience and a deep understanding of athletic facility renovations 
throughout Connecticut. Under the direction of Michael Doherty, PLA, North America Practice Leader, 
Landscape Architecture, the project will be led by Kevin Fuselier, PLA, LEED GA, Senior Principal / Team 
Leader Landscape Architecture. Mr. Fuselier has nearly two decades of experience managing comparable 
projects and is a recognized expert in outdoor athletic facility design. He will be supported by: 
• John Hammer, PLA, who will contribute to all phases of the project and brings extensive experience in 
athletic facility design, procurement, and construction oversight. 
• Ryan McEvoy, PE, who will lead civil engineering efforts and offers recent local experience through 
multiple projects.  
• Our in-house team of environmental scientists, survey crews, and geotechnical engineers. 
 
We appreciate your consideration and welcome the opportunity to discuss our proposal in greater detail. Please 
feel free to contact Kevin Fuselier, Project Manager, with any questions. 
Regards, 
SLR International Corporation 
  
Michael Doherty, PLA 
North America Practice Leader, Landscape 
Architecture 
mtdoherty@slrconsulting.com     
203.271.1773  
Kevin Fuselier, PLA, LEED GA 
Senior Principal / Team Leader Landscape 
Architecture 
kfuselier@slrconsulting.com             
203.271.1773 Ext. 2273 

Page 479

Contents
Cover Letter
1.0 Summary of Qualifications
2.0 Project Understanding
3.0 Relevant Experience / References
4.0 Project Team
5.0 Services Expected of the Town
6.0 Cost Proposal Form

Page 480

Section 1

Page 481

Summary of Qualifications
Company Overview
Who We Are
SLR International Corporation (SLR) is an international  
environmental consultancy that provides tailored  
environmental and engineering services across seven industry 
sectors – built environment, industry, infrastructure, mining & 
minerals, energy, power, and financial services. 
SLR International Corporation is 100% owned by SLR Holdings Limited, which falls under SLR  
Management Limited and SLR Global Limited originating out of the UK. SLR Management Limited 
was incorporated in England, registration number 6538090, in 1994. SLR International Corporation, 
the US official business registration, was incorporated in 2000 in Washington. The following  
individuals serve as SLR’s US Directors and Officers:
 
SLR’s Northeast operations are comprised mostly of the former Milone & MacBroom, Inc. (MMI) 
which was acquired in 2020. Founded in 1984, MMI served as the base for SLR to grow its US  
operations, offering specialized services and expertise from experienced technical staff.
In the US, SLR currently has over 550 employees located in 25 offices that are strategically located 
to best serve our clients. Resources are frequently shared between departments and offices within 
the US and worldwide, with regular review between senior managers to reinforce the most effective 
use of skilled and experienced personnel. 
Bradley Andrews Chief Executive Officer
Patrick Keaney Americas President
Stephen Dietzko Americas Vice President
Jason French Treasurer
Tricia Chrzanowski Secretary, Head of Legal

Page 482

Summary of Qualifications
Our team represents a broad and diverse range of technical and environmental capabilities. SLR’s 
professionals offer a blend of experience incorporating landscape architects, engineers, planners, 
environmental scientists, geologists, remediation specialists, and regulatory and compliance specialists.
Our Northeast team provides niche expertise in the areas of planning, natural resources management, 
development of complete streets, and climate adaptation, effectively integrating engineering, 
landscape architecture, environmental science, and community planning. Our in-house disciplines 
provide the full gamut of expertise needed to take projects from visions to reality including preparing 
initial project concepts; developing project budgets, project development reports, and construction 
documents; and providing construction engineering and inspection services. We work with communities 
to provide successful, creative, and sustainable solutions. 
For this pursuit, the SLR Project Manager and Point of Contact will be Kevin Fuselier, PLA, LEED GA,  
and he can be reached at (203) 271-1773 ext. 2273 or at kfuselier@slrconsulting.com. 
Our Services and Experience
Landscape Architecture 
The landscape architects at SLR apply artistic principles and technical design standards to enhance the 
built environment and preserve the natural landscape. Through careful analysis of the inherent functions 
of the natural landscape and the programmatic needs of our clients, the firm’s landscape architects 
collaborate with engineers, planners, and scientists to develop context-sensitive design solutions. 
These solutions are planned and designed to ensure respect for the surrounding land forms, the 
environment, and our client’s needs. Our design capabilities cover the full range of site development 
including active and passive municipal parks, playgrounds, greenways, streetscapes, city and town 
centers, residential communities, and commercial facilities. The variety in our client base has provided 
us with a broad range of experience and unique design skills to provide master planning through 
construction administration services for all project types. These services, as well as our superior quality 
of product, have gained us national recognition for our work.

Page 483

Summary of Qualifications
Civil Engineering & Site Analysis 
Civil engineering was one of the first disciplines in which SLR was founded on. The Civil Engineering 
Department has been committed to providing comprehensive site development services from concept 
to construction. Site planning and green infrastructure design represent the merging of the Civil 
Engineering and Landscape Architecture disciplines. By understanding a site’s natural resources and 
their inherent characteristics and functions, our design professionals seek to blend creatively our  
client’s development program within the framework of the site’s opportunities and constraints.
Geotechnical Engineering 
Geotechnical engineering is critical for understanding the earth on which a project will be constructed.  
A lack of information regarding soil conditions can lead to an unforeseen rise project costs. SLR provides 
geotechnical engineering experience to successfully accomplish the most difficult and complex 
engineering projects. Our firm has the depth and breadth to investigate and analyze projects of all 
sizes and types for private, local, state, and federal clients. Our geotechnical design services support all 
phases of a project and complement our civil engineering, landscape architecture, water resources and 
environmental science, planning, and transportation disciplines.
Outdoor Athletic Facilities 
The sheer increase in participants of all ages and the choices of sports to play has pushed the design 
profession to create competitive athletic fields and courts that are safer, perform better, recover 
faster, last longer, and require less maintenance. SLR is recognized as a leader in the planning, design, 
and construction inspection of outdoor athletic facilities at the collegiate, scholastic, and recreational 
level, having been responsible for over $100 million in improvements in the past decade. Our projects 
involve an analysis of indoor and outdoor facility conditions to first identify problems and deficiencies 
that affect safety, longevity, and possible expansion before evaluating the existing appropriate uses 
of activities for the facilities. Our experience at both the scholastic and collegiate levels includes new 
and replacement synthetic playing fields, track and field facilities, hard courts, and multipurpose fields 
including natural grass baseball, softball, football, and soccer fields. Through our project experience, we 
have become very familiar with the requirements of the various athletic sanctioning bodies including 
NCAA, USTA, NFHSA, and individual state scholastic bodies. We have found that the design of 
competitive athletic facilities requires the evaluation of several critical issues that may affect the quality 
of play and longevity of the facility. Our staff evaluates the placement and orientation of a field for 
optimum performance, establishes the appropriate grades for each playing surface, develops a suitable 
stormwater collection system, analyzes the appropriate specifications and methods of placing fill to 
control settlement, and selects the appropriate blend of grasses and soil structure for proper turf  
quality.

Page 484

Summary of Qualifications
Running Tracks 
SLR has been at the forefront in the design of running tracks for schools and colleges. Starting more than 
30 years ago, we have been involved with numerous projects and have been able to observe the full life 
cycle of maintenance and repair. We are able to share this knowledge and experience with our clients in 
their selection of appropriate surface treatments.
Natural Turf Fields 
SLR has extensive experience designing high-quality natural turf athletic fields and ballfields for schools, 
municipalities, colleges, and recreational organizations. Our team combines expertise in site planning, 
grading, drainage, irrigation, soil management, and field layout to create durable, safe, and high-performing 
playing surfaces. From multi-use athletic complexes to baseball and softball fields, SLR develops 
customized solutions that balance playability, maintenance requirements, sustainability, and long-term 
value. Through thoughtful design and attention to detail, we help clients deliver natural turf facilities that 
enhance the athlete experience and serve their communities for years to come.
Synthetic Turf Fields 
SLR designed the first polyethylene sand-rubber infill field in Connecticut and has remained current in the 
available products and field systems since that installation in Norwalk more than 20 years ago. Through 
our own independent research, we have become experts in understanding the practical environmental 
risks that have been attributed to the use of crumb rubber infill and have the knowledge and experience to 
address those issues in our design solutions. 
We have worked closely with school project committees in guiding them through the process of 
understanding the differences among turf manufacturers and products in order to select the system that 
best meets their program needs. 
Our athletic field projects include:
• Amity High School Synthetic Turf, Track & 
Grandstands - Woodbridge, CT
• Lyme-Old Lyme High School Synthetic Turf - 
Old Lyme
• Rockville High School Synthetic Turf & Track - 
Vernon, CT
• Bunnell High School Turf Replacement, Lighting 
Upgrades, and Baseball / Multipurpose Field - 
Stratford, CT
• O.H. Platt High School Synthetic Turf & Track - 
Meriden, CT
• Francis T. Maloney High School Synthetic Turf & 
Track - Meriden, CT
• Salisbury School Multipurpose Synthetic Turf 
Field - Salisbury, CT
• Yale Bowl Synthetic Turf - New Haven, CT
• Loomis Chaffee Synthetic Turf & Track - 
Windsor, CT
• MacDuffie School Synthetic Turf Field - Granby, 
MA
• Municipal Stadium Turf Replacement - 
Waterbury, CT
• Foran High School Synthetic Turf Softball Field 
- Milford, CT
• Westport Synthetic Turf Field Replacement - 
Westport, CT
• Hall High School Turf Replacement - West 
Hartford, CT
• Conard High School Turf Replacement - West 
Hartford, CT
• Agawam High School - Agawam, MA
• Berkshire Academy School - Sheffield, MA
• Bryant University Football Field - Smithfield, RI
• Dewitt Field at Yale University - New Haven, CT
• Reese Stadium at Yale University - New Haven, 
CT 
• Yale Field at Yale University - New Haven, CT
• Trumbull High School - Trumbull, CT 
• University of Bridgeport (Baseball) - Bridgeport, 
CT
• Bristol Eastern / Central High School - Bristol, 
CT 

Page 485

Summary of Qualifications
• Masuk High School - Monroe, CT 
• Hamden High School (Baseball) - Hamden, CT 
• South Windsor High School - South Windsor, 
CT
• Lauralton Hall - Milford, CT 
• The Gunnery - Washington, CT 
• Cos Cob Park - Greenwich, CT
• Canton High School - Canton, CT
• Farmington High School - Farmington, CT
Tennis and Pickeball Courts 
SLR has designed tennis and pickleball facilities in a variety of settings including colleges, high schools, 
and recreational environments. The scale of the facilities ranges from two courts in a local playground 
to multicourt complexes designed for competition. We work closely with our clients to find the best 
solution for them including evaluating program requirements, site constraints, and weighing options for 
either bituminous concrete base or post-tensioned concrete base construction.
Our projects involve an analysis of the existing conditions of the facility to identify issues that affect 
possible construction, the evaluation of appropriate uses of these facilities, and the design and 
construction administration of improvements. Each project is designed in accordance with Americans 
with Disabilities Act requirements and the rules of the sanctioning organization.
The design of competitive athletic facilities requires the evaluation of several critical issues that may 
affect the quality of play. Our experienced staff evaluates the placement of a tennis court for optimum 
orientation and establishes the appropriate grades for each playing surface. We educate clients on the 
short- and long-term cost-benefit analysis in installing bituminous base versus post-tension concrete-
based tennis courts.  
Universal Accessibility 
SLR always designs with universal access in mind. We are experts in state and federal guidelines 
including the Public Rights of Way Guidelines (PROWAG), American with Disabilities Act (ADA) 
Standards for Accessible Design and accessible trail and outdoor recreation facility guidelines created 
by the United States Access Board and U.S. Forest Service. At SLR, we understand the importance for 
all abilities to access the natural environment and share in the experience of our native habitats.
Staff Availability 
SLR’s main office address is:  
22118 20th Avenue SE, Suite G202 
Bothell, WA 98021
The local office that would handle this service for the Town is: 
99 Realty Drive 
Cheshire, CT 06410 
(203) 271-1773
of our clients have
worked with us for
less than 3 years
36%
of our clients have
worked with us for
over 3+ years
53%
Clients
of our clients have
worked with us 
between 3-5 years
11%
SLR

Page 486

Summary of Qualifications
Workload Capacity  
SLR understands that time is of the essence with any project. Since its inception, SLR has maintained 
a successful track record in meeting its clients’ scheduling needs with high-quality services. Our first 
priority on any assignment is to coordinate and communicate with our clients to determine their project 
requirements and scheduling needs. SLR assembles its personnel in project teams based on the nature 
of the assignment and its specific requirements. At points where the schedule or workload intensifies, 
additional staff assignments are made consistent with the level of work required. 
Our first priority on any assignment is to coordinate and communicate with clients and the  
municipality to determine their specific project requirements and schedule needs. Our Project Manager 
will then assign a discipline-specific team to work with the municipality to formulate a scope of services 
and schedule. Work will be performed while adhering to the agreed upon schedule. SLR can assure the 
Town that the necessary technical, administrative, and support services will be made available to  
complete this assignment within the Town’s established schedule.
Externally, our Project Managers and Principals maintain open and honest communication with our 
clients. For this project, monthly updates will be provided coincident with invoicing. Conference calls 
will be arranged when necessary to discuss project schedule and a project website will facilitate the 
sharing and availability of information. Work summaries will also be submitted with monthly invoices. 
The purpose of these communications will be to keep the Town informed. Perhaps the largest  
issue relating to schedule creep is lack of communication and/or length of time between regular 
communications. Our Project Managers and Principals are committed to identifying issues early, before 
they become problems.
Subconsultant Services 
SLR will be joined by SG Engineering, LLC, (56 FOXCROFT CT, Southington, CT 06489) is a Connecticut 
licensed electrical engineering firm that will assist SLR with any project related electrical needs.
Together, SLR and SG Engineering will serve as the Project Team and will work to successfully 
administer the requested services outlined in the RFQ. SLR will serve as the firm of record and party 
responsible for coordination of all project tasks.
Financial Stability 
SLR has more than adequate resources to undertake the assignments, including financial resources, 
personnel, and equipment. SLR has a steady revenue stream with FY 2024 being the firm’s most 
substantial in its history. We have a banking relationship with U.S. Bank and have significant credit 
facilities with our parent company banking group. SLR is owned by SLR Global Limited, which is the 
parent of a group of companies with operations in 6 regions, 100+ offices in 13 countries, and over 
4,500 global team members. SLR’s principal investor is Ares Capital Management which is a US-based 
private equity group.
The firm has substantial insurance resources including auto, general, worker’s compensation, and 
professional liability policies. The firm’s financials are audited by an independent accounting firm on an 
annual basis.
The US firm has no fixed or contingent project liabilities nor any encumbrances that would place any 
limitations whatsoever on the firm’s ability to perform its work, meet its obligations, or successfully 
complete the assignment.

Page 487

Section 2

Page 488

Technical Proposal
Project Understanding
SLR understands that the Town of Granby seeks professional engineering services to support a variety 
of capital improvement projects and municipal infrastructure initiatives through a five-year, task-
order-based contract. The projects identified in the Request for Proposals include the replacement 
of the running track at Granby Memorial High School/Middle School; improvements to the baseball 
and softball fields at Granby Memorial High School/Middle School; design of a year-round restroom 
facility at Salmon Brook Park; construction of new pickleball courts at Salmon Brook Park; assessment 
and administration of a sewer pump maintenance project; and other civil engineering assignments 
associated with the Town’s capital infrastructure program.
SLR recognizes that several project elements will require further evaluation and definition during 
the initial phases of work. Specifically, the Town may be considering improvements beyond those 
identified in the RFP, including potential replacement or enhancement of the existing synthetic turf field 
associated with the running track project and possible conversion of the baseball and softball fields to 
synthetic turf systems. Our team will work closely with Town staff and stakeholders to confirm project 
goals, establish design criteria, evaluate alternatives, and develop cost-effective solutions that align with 
the Town’s operational needs, budget, and long-term maintenance objectives.
For the athletic facility projects, SLR will draw upon our extensive experience in the planning, design, 
and rehabilitation of outdoor sports facilities, including running tracks, natural turf and synthetic turf 
athletic fields, baseball and softball complexes, court facilities, drainage systems, site grading, lighting 
coordination, accessibility improvements, and supporting infrastructure. We understand the importance 
of creating safe, durable, and high-performing recreational facilities that serve students, athletes, and 
the community while minimizing disruptions to ongoing operations.
For the Salmon Brook Park improvements, SLR understands the need to provide accessible, sustainable, 
and user-friendly recreational amenities that enhance the visitor experience and support year-round 
use of the park. Our approach will consider site constraints, utility availability, permitting requirements, 
accessibility standards, maintenance considerations, and opportunities for resilient and cost-effective 
design solutions.  
With respect to the sewer pump maintenance project and future municipal engineering assignments, 
SLR recognizes the importance of reliable public infrastructure and efficient project delivery. We will 
provide comprehensive engineering support, including condition assessments, design development, 
permitting assistance, bidding and procurement support, construction administration, and coordination 
with regulatory agencies as required.
SLR views this assignment as an opportunity to serve as a trusted engineering partner to the Town 
of Granby, providing responsive, multidisciplinary expertise across a diverse range of projects. We 
understand that the scope and priorities of individual task orders may evolve over the five-year term, 
and we are prepared to deliver flexible, timely, and practical engineering solutions that support the 
Town’s capital improvement goals and enhance community assets for years to come.

Page 489

Section 3

Page 490

PROJECT PROFILE
Making Sustainability Happen
SLRCONSULTING.COM
CLIENT
SERVICES
• Environmental Analysis
• Design
• Bidding
• Construction Administration
City of Stamford, CT
The City of Stamford, through 
a competitive bid process, 
retained SLR to design a 
multipurpose synthetic turf 
field at the Stamford High 
School campus located at 55 
Strawberry Hill Avenue. The 
existing project site consisted 
of a natural grass baseball field, 
and a natural grass softball 
field. 
Working through many design 
concepts, the City and school 
ultimately decided to not 
create one single multi-sport 
field, but rather a dedicated 
synthetic turf softball field, and 
a synthetic turf baseball field 
with an expanded outfield that 
fits a multi-sport field overlay.  
Both fields received all 
new treatments including 
backstops, fencing, dugouts, 
bleachers, bullpens, and 
batting cages. The new 
fields are interconnected 
to one another and to the 
school building through new 
Americans with Disabilities Act 
(ADA) walkways.  
Stamford High School Baseball & Softball Field
STAMFORD, CT

Page 491

PROJECT PROFILE
Making Sustainability Happen
SLRCONSULTING.COM
CLIENT
SERVICES
• Survey
• Wetlands Investigation
• Geotechnical Engineering
• Civil Engineering
• Landscape Architecture
• Construction Administration
Wallingford Public Schools
Wallingford Public Schools 
retained SLR to design plans 
and specifications for the 
replacement of the running 
track and synthetic turf field 
at Sheehan High School. SLR 
survey crews created the base 
map for the project drawings.  
SLR geotechnical engineers 
invested the condition of the 
running track’s asphalt base 
and subsoils, which dictated 
the track replacement design 
and specifications.  
SLR also assisted the 
School through the bidding 
process and provided weekly 
construction inspections 
and oversight during the  
construction season.  
Mark T. Sheehan High School Track & Field Replacement
WALLINGFORD, CT

Page 492

PROJECT PROFILE
Making Sustainability Happen
SLRCONSULTING.COM
CLIENT
SERVICES
• Civil Engineering
• Landscape Architecture
Yale University
Yale University contracted 
SLR to redesign their tennis 
facilities, the historical 
site of the Connecticut 
Open. SLR was responsible 
for the preparation of 
plans, specifications, and 
construction-phase services 
for the reconstruction of 12 
of the Yale University varsity 
tennis courts. 
Six of the courts were 
demolished and reconstructed 
in the same location and 
six of the courts required a 
realignment prior to being 
reconstructed. 
The courts were surfaced with 
bituminous concrete and a 
cushioned DecoTurf surface. 
In addition, various other 
Yale University Varsity Tennis Courts
NEW HAVEN, CT
site improvements such as 
new fencing with fan boxes, 
surrounding walkways, and 
updated landscaping were 
included in the project. 
The DecoTurf cushioned 
surfacing system provided a 
state-of-the-art surface that 
the athletes could trust for 
safe, comfortable gameplay 
and the numerous site 
improvements improved the 
spectator experience. 
The project was completed 
on time for use in the 
2019 Connecticut Open, a 
professional tennis tournament 
usually played just before the 
fourth and last Grand Slam 
tournament of the year,  
the US Open.

Page 493

PROJECT PROFILE
Making Sustainability Happen
SLRCONSULTING.COM
CLIENT
SERVICES
• Master Plan
• Civil Engineering / Site Design
• Landscape Architecture
• Permitting
• Construction Administration
Greens Farms Academy
Greens Farm Academy, 
an independent school in 
Westport, Connecticut, 
retained SLR as the lead 
consultant to design the 
expansion of its outdoor 
athletic facilities. The 
initial services involved 
the development of a site 
master plan for the fields and 
related roads, parking, and 
infrastructure. 
The first phase of construction 
included a synthetic turf field, 
baseball fields, and a tennis 
complex. 
Greens Farms Academy Athletic Fields
WESTPORT, CT
The second phase included 
the development of three 
additional natural grass 
fields. The final phase of 
improvements included a new 
softball field and new driveway 
and parking facilities. Extensive 
landscaping was installed to 
provide a visual and noise 
buffer for adjacent residential 
properties.
Given the proximity to tidal 
wetland of Long Island Sound, 
stormwater management 
was critical to receiving local 
and state environmental 
permits. “Rain garden” 
water quality basins were 
constructed to manage peak 
flows. Pervious bituminous 
concrete was installed in 
the new parking areas. A 
gravel blanket was installed 
beneath the natural grass 
fields to promote infiltration 
and reduce direct runoff. An 
integrated turf management 
plan was prepared including 
a groundwater monitoring 
system to carefully control the 
use of fertilizers and other turf 
chemicals.

Page 494

PROJECT PROFILE
Making Sustainability Happen
SLRCONSULTING.COM
CLIENT
SERVICES
• Survey
• Geotechnical Engineering
• Landscape Architecture
• Civil Engineering
• Bid Assistance
• Construction-Phase Services
City of Middletown, CT
SLR worked extensively with the Middletown High School Track and Field building committee to 
investigate the existing facility and then prepare the construction documents for the replacement of 
the running track and synthetic turf field at Middletown High School.  The project included a full-depth 
replacement of the 8-lane running track and event areas, along with the replacement of the running 
track’s interior synthetic turf field.  SLR attended monthly building committee meetings to provide 
project updates and made weekly site visits during construction to oversee the progress of the project.
Middletown High School Track & Field
MIDDLETOWN, CT

Page 495

PROJECT PROFILE
Making Sustainability Happen
SLRCONSULTING.COM
CLIENT
SERVICES
• Topographic Survey
• Geotechnical Engineering
• Civil Engineering
• Landscape Architecture
• Construction Administration
Portland Schools
SLR was awarded the design 
of a high school athletic facility 
project by Portland Schools. 
The running track at the town 
high school had well surpassed 
its life expectancy and needed 
to be replaced or be closed 
off from use dure to safety 
concerns.
The existing asphalt based 
running track was demolished 
and replaced with a state-
of-the-art post- tensioned 
concrete based running 
track making it the fifth 
running track in the state of 
Connecticut constructed with 
a post-tensioned concrete 
base.
Portland High School Running Track Replacements
PORTLAND, CT
The benefit of constructing 
bases with post-tensioned 
concrete in lieu of traditional 
asphalt is that the base will not 
crack over time thus requiring 
costly repairs or replacement. 
The grass multipurpose playing 
field within the track was 
protected and maintained 
throughout construction.
An improved drainage system 
as well as improvements to 
the spectator seating areas 
and universally accessible 
walks were also designed and 
constructed as part of the 
project.

Page 496

PROJECT PROFILE
Making Sustainability Happen
SLRCONSULTING.COM
CLIENT
SERVICES
• Survey
• Landscape Architecture
• Public Outreach
• Water Supply Planning
• Design Documents
• Permitting
Regional School District No. 18
SLR was retained by the 
Regional School District No. 
18 to analyze the existing 
grass multiuse athletic fields 
at the Lyme-Old Lyme High 
School campus to determine 
which of their three fields was 
most suitable to convert to a 
synthetic grass playing surface. 
SLR conducted topographic 
surveys for the three sites 
under consideration, followed 
by preparation of schematic 
designs and rough order 
of magnitude pricing. SLR 
prepared an online survey 
which allowed the school 
district to solicit comments 
and feedback regarding the 
needs of the school’s athletic 
programs and the deficiencies 
Lyme-Old Lyme High School Athletic Field
OLD LYME, CT
of the existing facilities. The 
outcome of this investigation 
influenced the school district 
to select a preferred field 
to convert to synthetic turf. 
Another outcome of this initial 
phase was the realization that 
the school campus, which is 
comprised of three schools, 
had another critical issue 
regarding the lack of water for 
both building uses and field 
irrigation. 
While funding for the synthetic 
turf field was ongoing, SLR 
specialists were once again 
retained to help the school 
district explore additional 
sources of water on campus 
and design a new water supply 
system which allowed the 
school to have a dedicated 
potable water source for 
building use, and a new 
independent water supply for 
field irrigation use. 
In 2020, with funding for the 
turf field in place, SLR prepared 
final design documents for 
the field, assisted the school 
district in obtaining the 
necessary land use permits and 
put the project out to bid. 
Construction of the new field 
commenced in the summer 
of 2021. The school district 
worked with SLR to obtain 
additional land use approvals 
for the inclusion of athletic 
field lighting into the project.

Page 497

PROJECT PROFILE
Making Sustainability Happen
SLRCONSULTING.COM
CLIENT
SERVICES
• Topographic Survey
• Wetlands Delineation
• Geotechnical Engineering
• Civil Engineering
• Structural Engineering
• Landscape Architecture
• Public Engagement
• Permitting
• Cost Estimating
City of Westfield, MA 
SLR is currently contracted 
to provide construction 
oversight for the proposed 
athletic facility improvements 
at Westfield High School. The 
scope of work includes the 
development of a new track 
and field complex, throwing 
event areas, a synthetic turf 
field within the stadium, 
bleachers and press box, 
restroom and concession 
facilities, pedestrian and 
field lighting, a synthetic 
turf softball diamond, and 
synthetic turf installation at 
Boardman Field.
All three athletic fields will 
utilize synthetic turf with no 
We s t fi eld High School Athletic Fields
WESTFIELD, MA 
intentionally added PFAS 
chemicals, in alignment with 
current environmental and 
public health standards. These 
improvements will enable 
the school to host track and 
field and football events on-
site, addressing the current 
reliance on off-campus 
facilities and significantly 
enhancing accessibility for 
student-athletes.
This project is the result 
of feasibility studies and 
preliminary design efforts 
led by SLR. The construction, 
valued at approximately $9 
million, is being executed by 
Mountain View Landscapes, 
with SLR serving as the 
construction oversight 
consultant to ensure quality 
and compliance throughout 
the build.

Page 498

PROJECT PROFILE
Making Sustainability Happen
SLRCONSULTING.COM
CLIENT
SERVICES
• Landscape Architecture
• Civil Engineering
• Geotechnical Engineering
• Wetland Investigations
• Cost Estimating
Cheshire Public Schools
In 2023, Cheshire Public Schools 
partnered with SLR to reimagine 
the outdoor athletic experience 
at Cheshire High School. From 
the outset, SLR engaged coaches, 
administrators, and district 
leaders to understand how the 
facilities are used today and what 
the community envisions for the 
future.
To ground the planning effort 
in solid technical insight, SLR’s 
geotechnical team completed a 
detailed subsurface investigation 
of the running track, while our 
wetland scientists evaluated and 
delineated nearby watercourses 
to ensure environmental 
compliance. Working alongside a 
local contractor, we also opened 
targeted test pits across the 
natural grass fields to assess 
existing conditions and inform 
design opportunities.
With a clear understanding of 
site constraints and program 
goals, SLR crafted two forward 
looking master plan concepts 
that position the district to 
enhance safety, elevate athletic 
performance, and create a 
more vibrant, resilient campus 
environment.
Maclary Sports Complex Masterplan
CHESHIRE, CT

Page 499

PROJECT PROFILE
Making Sustainability Happen
SLRCONSULTING.COM
BRITANNIA STREET
TREMONT STREET
LOCUST STREET
8%
5.2%
25'
DUGOUT (TYP.)
180'
180'
MAINTENANCE/STORAGE
SHED
180'
REUSE EXISTING
BLEACHERS (TYP.)
DUGOUT (TYP.)
275'
REUSE EXISTING
BLEACHERS (TYP.)
40'
275'
300'
SCOREBOARD
SCOREBOARD
SIDEWALK
CONNECTIONS
(TYP.)
NEW 60' SOFTBALL
DIAMOND
NEW 90' BASEBALL
DIAMOND
NEW PARKING
LOT
POTENTIAL
STORMWATER
MANAGEMENT AREA
POTENTIAL
STORMWATER
MANAGEMENT AREA
61
Copyright SLR International Corporation - 2021
99 REALTY DRIVE
CHESHIRE, CT 06410
203.271.1773
SLRCONSULTING.COM
CLIENT
SERVICES
• Site Survey
• Landscape Architecture
• Schematic Design
• Cost Estimation
• Soils Testing
• Wetland Investigation
• Geotechnical Investigation
• Irrigation Design
• Civil Engineering
• Permitting
Meriden Public Schools
SLR was retained by 
Meriden Public Schools to 
redesign an existing ball 
field complex historically 
used for Little League. When 
completed, the redesign 
facility will be home to a 
new regulation softball field, 
and a regulation high school 
size baseball field. 
North End Field at Britannia Street
MERIDEN, CT
SLR is designing the 
facility so that it can be 
constructed with natural 
grass fields or, if funding 
permits, with synthetic turf 
surfacing. 
SLR is responsible for 
designing irrigation, field 
lighting, and restroom 
facilities. 

Page 500

PROJECT PROFILE
Making Sustainability Happen
SLRCONSULTING.COM
CLIENT
SERVICES
Loomis Chaffee School
• Survey
• Geotechnical Engineering
• Landscape Architecture
• Civil Engineering
• Bid Assistance
• Construction Phase Services
Building on a long-standing relationship with the Loomis Chaffee School, SLR was once again retained 
in 2025 to design the replacement of the running track at the School’s Windsor, Connecticut campus. 
The project began with comprehensive site investigations, including a new topographic survey of the 
track and its surrounding areas. SLR’s geotechnical team also performed a series of borings to evaluate 
the condition and reusability of the existing base materials. Their assessment concluded that while the 
track base required full replacement, the existing asphalt could be pulverized and reused to support the 
new track system.
SLR managed the competitive bidding process on behalf of the School, reviewing contractor 
submissions and conducting interviews with the low bidders. When construction begins in Spring 
2026, SLR will provide ongoing oversight, including review of material submittals, facilitation of on-site 
project meetings, and construction observation to verify compliance with the design documents.
Loomis Chaffee School Track Reconstruction
WINDSOR, CT

Page 501

PROJECT PROFILE
Making Sustainability Happen
SLRCONSULTING.COM
CLIENT
SERVICES
• Civil Engineering/Site Design
• Landscape Architecture
• Permitting
• Construction Administration
FieldTurf
SLR was retained by FieldTurf 
to provide engineering and 
design services for the running 
tack reconstruction and the 
installation of a synthetic turf 
field at Amity High School.  
Track and Field Construction at Amity High School
WOODBRIDGE, CT
The existing asphalt running 
track was replaced with the 
post-tensioned concrete 
track.  In addition to the new 
running track and synthetic 
turf field, SLR provided design 
assistance for new LED 
athletic field lighting, an LED 
video scoreboard, elevated 
grandstand, and facility 
walkways and drives.  
SLR prepared all land use 
applications and presented the 
project at land use commission 
meetings.  Throughout the 
duration of construction, 
SLR provided construction 
oversight on a weekly basis. 

Page 502

PROJECT PROFILE
Making Sustainability Happen
SLRCONSULTING.COM
CLIENT
SERVICES
• Topographic Survey
• Geotechnical Engineering
• Wetland Investigation
• Environmental Investigation
• Permitting
• Landscape Architecture
• Civil Engineering
• Construction Inspection 
Amherst-Pelham Regional 
School District
SLR was engaged by the 
Amherst-Pelham Regional 
School District to design a 
state-of-the-art track and 
field complex at Amherst-
Pelham Regional High School 
in Amherst, Massachusetts. 
Working closely with 
the school’s building 
committee, SLR developed 
a competition-grade running 
track surrounding a high-
performance natural grass 
multipurpose field, complete 
with subsurface drainage and a 
modern irrigation system. The 
facility also features a high-
mast LED lighting system to 
support extended use.
A unique aspect of the project 
was its location over the Tan 
Brook culvert, which bisects 
the site. To protect this 
sensitive watercourse, the 
design and construction teams 
implemented specialized 
inspections and mitigation 
measures to avoid disturbance.
In addition to the primary 
field, the project included the 
construction of a second high-
Amherst-Pelham Regional High School  
Track & Field Improvements
AMHERST, MA
performance multipurpose 
field adjacent to the track. The 
overall site improvements also 
incorporated ADA-compliant 
walkways and upgraded 
on- and off-street parking to 
enhance accessibility and user 
experience.

Page 503

PROJECT PROFILE
Making Sustainability Happen
SLRCONSULTING.COM
CLIENT
SERVICES
• Request for Proposal (RFP)      
Preparation
• Design Specifications
• Bid Assistance
• Construction Administration 
Asistance
Town of Windsor, CT
SLR was retained by the 
Town of Windsor to assist 
in the preparation of a 
design-build request for 
proposal (RFP) to replace 
the existing asphalt tennis 
courts at the high school 
with new posttensioned 
concrete courts. In addition 
to installing 6 new tennis 
courts and perimeter 
fencing, the existing metal 
halide lighting was replaced 
with competition level  
LED lighting.
Windsor High School Tennis Court Reconstruction
WINDSOR, CT
SLR assisted the town with 
preparing and issuing the 
RFP, responding to bidders’ 
questions, and bid review. 
Throughout construction, 
SLR participated in onsite 
construction meetings 
and periodic inspection 
of the work assuring it’s 
conformance to the  
project requirements.

Page 504

PROJECT PROFILE
Making Sustainability Happen
SLRCONSULTING.COM
CLIENT
SERVICES
• Procurement
• Construction Oversight
Town of Windsor, CT
The town selected a contractor 
via a design/build process.  
SLR provided procurement and 
construction oversight services 
to the Town of Windsor for the 
reconstruction of tennis courts.  
SLR reviewed submittals and 
oversaw the construction of 
new post-tensioned concrete 
pickleball courts, tennis courts, 
a shade structure and sound 
barrier wall.
L.P. Wilson Community Center Pickleball & Tennis Courts
WINDSOR, CT

Page 505

PROJECT PROFILE
Making Sustainability Happen
SLRCONSULTING.COM
CLIENT
SERVICES
• Survey
• Geotechnical Investigations
• Landscape Architecture
• Civil Engineering
• Bidding Assistance
• Construction Phase Services
Snyder Architects
SLR provided survey, 
geotechnical, design, 
bidding, and construction 
phase services for the 
reconstruction of tennis 
courts for the Town of 
Stratford.  The project 
included the removal of 
two clay tennis courts, 
which were replaced with 
four new post-tensioned 
concrete tennis courts 
and included a new LED 
court lighting system. 
Longbrook Park Tennis Courts   
STRATFORD, CT 

Page 506

PROJECT PROFILE
Making Sustainability Happen
SLRCONSULTING.COM
CLIENT
SERVICES
• Survey
• Geotechnical Investigations
• Landscape Architecture
• Civil Engineering
• Bidding Assistance
• Construction Phase Services
Laurel Beach Association
SLR worked extensively 
with the association to 
develop design concepts to 
replace the existing tennis 
courts at the Laurel Beach 
Association in Milford, CT.  
Once a preferred concept 
was selected, SLR provided 
survey, geotechnical, design, 
bidding and construction 
phase services for the 
construction of three post-
tensioned concrete tennis 
courts, and four pickleball 
courts.  
Laurel Beach Association Pickleball & Tennis Courts 
MILFORD, CT

Page 507

PROJECT PROFILE
Making Sustainability Happen
SLRCONSULTING.COM
CLIENT
SERVICES
• Survey
• Landscape Architecture
• Civil Engineering
• Bidding Assistance
• Construction Phase Services
Town of Bethlehem, CT
SLR worked extensively with 
the town to develop a master 
plan for Memorial Park. For 
Phase 1 of the master plan 
implementation, we developed 
design concepts to replace 
the existing bituminous tennis 
courts and upgrading the 
adjacent parking lot/ entry 
drive to increase functionality.  
Memorial Park Tennis & Pickleball Courts 
BETHLEHEM, CT
Once a preferred concept 
was selected, SLR provided 
survey, design, bidding and 
construction-phase services 
for the construction of two 
post-tensioned concrete 
tennis courts, two post 
tensioned concrete pickleball 
courts, a concrete plaza 
viewing area and upgraded 
parking lot.    

Page 508

TECHNICAL SERVICE
Making Sustainability Happen
SLRCONSULTING.COM
 
• Borough of Naugatuck, CT
• City of Bridgeport, CT
• City of Danbury, CT
• City of Derby, CT 
• City of Dover, NH
• City of Groton, CT
• City of Hartford, CT
• City of Lewiston, ME
• City of Manchester, NH
• City of Meriden, CT
• City of New Britain, CT
• City of New London, CT
• City of Rochester, NH
• City of Springfield, MA
• City of Torrington, CT
• City of Waterbury, CT
• Town of Beacon Falls, CT
• Town of Berlin, CT
• Town of Bloomfield, CT
• Town of East Hartford, CT
• Town of Enfield, CT 
• Town of Farmington, CT
• Town of Greenwich, CT
• Town of Hamden, CT
• Town of Hampton, NH
• Town of Hunter, NY
• Town of Madison, CT
• Town of Morris, CT
• Town of New Milford, CT
• Town of Pawling, NY
• Town of Redding, CT (since 1984)
• Town of Salem, NH
• Town of Scarborough, ME
• Town of Shandaken, NY
• Town of Southbury, CT (since 1985)
• Town of Southington, CT
• Town of South Windsor, CT
• Town of Trumbull, CT
• Town of Wallingford, CT
• Town of Waterford, CT
• Town of West Hartford, CT
• Town of West Springfield, CT
• Town of Windsor, CT
• Town of Woodbury, CT
• Town of York, ME
• Androscoggin Transportation  
Resource Center (ME)
• Capitol Region Council of  
Governments (CT)
On-Call  
Services
SLR offers on-call, task-based, and 
as-needed consulting services to 
municipalities, state government and 
county agencies, public and private 
utilities, and regional transportation and 
planning organizations. Our range of 
services provided includes survey and 
design; traffic, planning and economic 
studies; construction administration and 
inspection; peer reviews for development 
plans and permit applications; and 
technical support for local commissions 
and land use boards.
• Chittenden County Regional  
Planning Commission (VT)
• CT Dept. of Administrative /  
Construction Services
• CT Dept. of Transportation
• Delaware County Soil & Water Conservation District (NY)
• Eversource
• Greater New Haven WPCA
• MA Dept. of Conservation & Development
• MA Dept. of Ecological Restoration
• MA Dept. of Transportation
• ME Dept. of Transportation
• Metropolitan Council of Governments (CT)
• Metropolitan District Commission
• Naugatuck Valley Council of Governments (CT)
• Northwest Regional Planning Commission (VT)
• Norwich Public Utilities
• NYC Dept. of Environmental Protection
• NYS Office of General Services
• Portland Area Comprehensive Transportation System (ME)
• South Central Regional Council of Governments (CT)
• University of Connecticut
• VT Agency of Transportation
• VT Dept. of Natural Resources
The following represents current and recent clients for which SLR has furnished on-call services.

Page 509

PROJECT PROFILE
Making Sustainability Happen
SLRCONSULTING.COM
CLIENT
SERVICES
• Transportation Engineering
• Transportation Planning
• Landscape Architecture
• Water & Wastewater Engineering
• Construction Engineering & 
Inspection
• Structural Engineering
• Water Resources Engineering
• Geotechnical Engineering
• Environmental Engineering
• Surveying
City of Waterbury, CT
While SLR has served the city of 
Waterbury for more than 30 years, 
in 2021 the firm was engaged via a 
multiple-year “On-Call” agreement 
to provide planning, engineering, and 
construction services on behalf of 
Public Works/Engineering, Board of 
Ed., Water Department, and Waterbury 
Development Corp. Given the timing 
of ARPA and ESSER programs, SLR has 
enjoyed tremendous collaboration and 
repeated success across the city. Our 
teams have supported the city and WDC 
on successful grant applications for 
numerous projects. Most recently, our 
experience includes:
• Complete Streets/transit connectivity 
enhancements throughout 
Downtown; East Main, North Main, 
South Main, and Bank Streets
• Water and sewer replacement and 
upgrade projects throughout the 
Downtown; making public Wi-Fi and 
fiber optic in available throughout
• Renovations to six fire stations
• Replacement and upgrade for the 
city’s three potable water pumping 
stations.
• Replacement of city pools at 
Hamilton Park; Washington Park and 
Fulton Park
• Replacement of all 27 city and 
school playgrounds
• Library Park, MLK Park, Fulton Park, 
Lakewood Park, Carrington School 
Learning Park, Chase Park, Municipal 
Stadium lighting
• City Hall and Prospect Street 
Parking Lots and EV Charging
• City-wide paving, Naugatuck River 
Greenway construction inspection
• 909 Bank and Anamet parcel 
environmental due diligence
• Various bridge inspections, grant 
applications, and design
• Various intersection safety 
improvement projects across the 
city
• Miscellaneous planning/zoning 
application peer reviews
On-Call Engineering Services
WATERBURY, CT
Library Park
Exchange Place “Complete Streets”
Hamilton Park Pool

Page 510

PROJECT PROFILE
Making Sustainability Happen
SLRCONSULTING.COM
CLIENT
SERVICES
• Survey
• Planning
• Engineering
• Environmental
• Geotechnical
• Landscape Architecture
• Planning & Zoning Reviews
• Wetland Commission Assistance
• Construction Administration
• Road Maintenance Advisory
Town of Beacon Falls, CT
Technical support services provided 
under this contract include all facets 
of municipal engineering.  
Our services are integrated with 
the various town departments and 
land use commissions, especially 
the Office of the First Selectman, 
Department of Public Works, Planning 
& Zoning Commission, and the 
Inland Wetlands and Watercourses 
Commission. Assignments include:
Roadway, Utility, & Infrastructure 
Analysis & Design
• Pavement rehabilitation analysis, 
horizontal and vertical geometric 
improvements
• Structural design, assessment, 
and inspection including bridges/
culverts
• Sanitary sewer rehabilitation and 
replacement
• Hydrologic and hydraulic storm 
water analysis
Public Recreation & Park Facilities
• Review of Beacon Falls Recreation 
Complex
• Recommendations, design and 
implementation for basketball 
courts, pickleball courts, trails, 
parking lots, etc.
Environmental Permitting & 
Compliance
• Municipal stormwater sampling 
and reporting
• Regulatory permitting for 
municipal and economic 
development projects
• Wetland delineation, assessment, 
and restoration
Capital Improvement Planning 
• Grant application assistance with 
state and federal funding programs
• Technical assistance and support 
with redevelopment initiatives
Road Maintenance Advisory & 
Inspection
• Review of town roads and 
preparation of a road maintenance 
program
• Assistance with chip and fog 
sealing application requirements 
and inspection
• Recommendations for mill and 
overlay, reclamation, and/or full-
depth roadway reconstruction
Town Commission Reviews & 
Technical Assistance 
• Planning & Zoning meeting 
attendance and site plan reviews 
and remediation assistance
• Inland Wetlands and Watercourses 
meeting attendance, plan reviews, 
and remediation assistance
On-Call Engineering Services
BEACON FALLS, CT

Page 511

PROJECT PROFILE
Making Sustainability Happen
SLRCONSULTING.COM
General Municipal Engineering 
Assistance
• Property investigations, 
topographic/boundary survey, 
erosion control inspections
• Residential development and site 
plan reviews
• Building Inspections
Construction Inspection
• Roadway, drainage, utility, 
recreation, demolition
• Private, municipal, & state federally 
funded projects
SLR has worked on the following list 
of projects over the course of the 
on-call contract with the Town of 
Beacon Falls.
Projects
• Town-wide Boring Program
• Paving Program Management
 - Randall, Hillside, Stoddard, Jane, 
Lady Slipper, Columbine, Nyumph, 
Hockanum Glen, Avenue C, Avenue 
D, Avenue E, part of Feldspar
• Beacon Valley Road Rehabilitation
• Beacon Valley Road Bridge 
Rehabilitation
• Pent Road Park - Basketball & Pickleball 
Courts
• Cook Lane Drainage and Road 
Rehabilitation
• Patricia, Dolly, and Coventry Road 
Rehabilitation
• Burton Road Sewer and Road 
Rehabilitation
• Church Street Rehabilitation
On-Call Engineering Services 
Beacon Falls, CT

Page 512

PROJECT PROFILE
Making Sustainability Happen
SLRCONSULTING.COM
CLIENT
SERVICES
• Survey
• Planning
• Engineering
• Permitting
• Structural Inspection
• Landscape Architecture
• Environmental
• Construction Administration
Town of Enfield, CT
The firm has provided on-call 
engineering services to the Town of 
Enfield since 2010. A sampling of 
projects completed under this on-call 
contract include:
Enfield Roads Reconstruction:
• Designed 18 roadways funded 
under a $20 million bond 
package and provided full-time 
construction administration 
services. The project assignment 
included roadway reconstruction 
and paving, sidewalk and 
intersection improvements, and 
incidental work such as resetting 
structures, pavement markings, 
and maintenance and protection 
of traffic.
Freshwater Pond Streetscape 
Improvements:
• Provided survey, design, and 
regulatory permitting for 
approximately 1,400 feet of 
streetscape improvements 
including removal and 
reconstruction of existing multi-
use trail, implementation of 
root protection, installation of 
ornamental lighting and provision 
of park benches, trash receptacles, 
and other amenities.
Armed Services Memorial Design 
Concept Planning:
• Performed feasibility study and 
design of a memorial at two 
locations on the town green, with 
services including the development 
of two alternate memorial 
concepts, a conceptual site plan 
and conceptual memorial sketches 
(including elevations, thumbnail 
perspectives, etc.).
Former CT Valley Oil Property 
Pre-acquisition Due Diligence 
Investigations:
• Conducted a Phase I 
Environmental Site Assessment 
(ESA) for the parcel located at 
325 Hazard Avenue in Enfield, 
Connecticut. The Phase I identified 
areas of potential environmental 
concern associated with past 
land usage. SLR recommended 
and performed a Phase II 
Environmental Site Assessment 
that involved the collection of soil 
and groundwater samples from the 
areas of potential environmental 
concern. The results were 
communicated to the Town of 
Enfield on an expedited basis.
Shannon Drive/Kelly Drive 
Drainage:
• Completed design and permitting 
activities associated with a 
project originally initiated by 
Town Engineering. Project 
included development of contract 
documents for construction of a 
stone access road and proposed 
drainage structures, piping, and a 
riprap channel to mitigate existing 
erosion.
On-Call Engineering Services
ENFIELD, CT

Page 513

References
References  
1. Windsor High School Tennis Court Replacement, O’Brien Stadium Turf 
Replacement, Welch Park Tennis and Pickleball Courts, L.P. Wilson 
Community Center Tennis and Pickleball Courts  
Organization Name: Town of Windsor, CT Engineering 
Name: Jenna A.W. Zinky 
Role: Assistant Town Engineerr 
Email: zinky@townofwindsorct.com 
Phone Number: (860) 331-3151 mobile 
2. Stamford High School Turf Ballfields, Stamford High School Turf Field 
Replacement, Westfield High School Turf Replacement, Scalzi Park Tennis, 
Pickleball, and Bocce Courts, Rippowam Middle School Track 
Organization Name: City of Stamford, CT Engineering 
Name: Ralph Martin 
Role: Project Manager 
Email: martin@stamfordct.gov 
Phone Number: (203) 223-1674 mobile 
3. Westfield High School Sports Complex 
Organization Name: City of Westfield, MA 
Name: Tammy Teft 
Role: Chief Procurment Officer 
Email: t.teft@cityofwestfield.org 
Phone Number: (413) 572-6254 

Page 514

Section 4

Page 515

 
Landscape Architecture 
John Hammer, PLA
Glen Martin, PLA
James Marchetti
 
Geotechnical Engineering 
Marie Bartels, PE
Katie Reed, EIT
 
 
Survey 
Michael Mansfield, LS 
Greg Szyszkowski, LS
 
Water & Wastewater 
Engineering 
 
Civil Engineering 
Ryan McEvoy, PE
Andrew Goralski, PE
Molly Berardi, PE
Town of Granby
Principal-in-Charge
Michael Doherty, PLA
Project Manager / Athletics Specialist
Kevin Fuselier, PLA, LEED GA
Organization Chart
Subconsultants: 1SG Engineering, LLC
 
Electrical Engineering 
1Steve Gendreau
 
LEP 
Scott Bristol, LEP, PG
 
Structural Engineering 
Kishor Patel, PE
Shelley Plude, PEThomas Knowlton, PE

Page 516

Michael T. Doherty, PLA
North America Practice Leader, Landscape Architecture  | Cheshire, CT
Michael Doherty serves as the North America Practice Leader, Landscape 
Architecture. With over 20 years of experience in the fields of landscape 
architecture, horticulture, and forestry, Mike blends the natural and man-made 
environments by balancing creative context-sensitive approaches with solid 
technical detailing to create accessible and engaging public spaces. Much of 
Mike’s career has focused on expanding community access to outdoor spaces 
to promote healthy lifestyles, active and passive recreation, and the enjoyment 
of the community resources where we live, work, and play. Mike leads teams and 
projects of all sizes and complexities from inception through construction.
Years of Experience
21 years with the firm  |  1 year with other firms
Professional Registrations
• Landscape Architect - CT, NY, CO
Education
• MLA, Landscape Architecture, State University of New York, College of Environmental Science & 
Forestry
• BS, Urban Forestry & Landscape Horticulture, University of Vermont
Project Experience
Pat Kidney & Woodrow Wilson Track & Field Facilities, Middletown, CT
Project Manager for a 15-acre park renovation that included the construction of multiple athletic 
facilities. The project included multiple sports fields, irrigation systems, basketball courts, 2 concession/
restroom/storage buildings, 500-seat bleachers, 100-vehicle parking lot, playground, athletic field sports 
lighting, walking trails, landscaping, and site security systems.
Middletown Athletic Fields & Parks Evaluation, Middletown, CT
Project Manager for the evaluation of 17 athletic field and park sites. The evaluation included quality of 
the fields, safety, and accessibility. Recommendations for each site were made and incorporated into a 
capital improvement plan that included proposed graphics to engage the public.  
Middletown Tennis Facility, Middletown, CT
Project Manager responsible for the design and construction of an outdoor six court post-tension 
concrete tennis facility for the City of Middletown. Other site enhancements include invasive vegetation 
removal, native landscaping, rain gardens, and streambank improvements. 
Choate Rosemary Hall Athletic Fields, Wallingford, CT
Provided landscape architecture services for a new entry plaza and landscaping associated with a 
natural turf JV baseball field and two multiuse, state-of-the-art synthetic fields.
Revitalization of Bristol Parks, Bristol, CT
Conducted a comprehensive vegetative analysis and prepared a summary report for the 100+ acre 
Rockwell Park.
Riverside Park, Westport, CT
Principal-in-Charge overseeing the redevelopment of the 6.5 acre park on the Saugatuck River. 
Improvements include improved and accessible walking paths, parking, and waterfront access; site 
amenities; native landscaping; and stormwater management infrastructure.
Memorial Park Feasibility Study, Hoosick, NY
Principal in Charge assisting the Village of Hoosick Falls in determining the potential for a public park 

Page 517

Michael T. Doherty, PLA
North America Practice Leader, Landscape Architecture  | Cheshire, CT
on a former factory site. SLR engineers and Landscape Architects reviewed previously prepared 
ESA reports and closure documents to ensure all proposed public improvements could meet the 
environmental restrictions of the site. Selected improvements included expanded parking, entry 
gateway, event lawn, play structures, open-air pavilion, and trail access within the 8 acre site.
Norwich Waterfront Improvements, Norwich, CT
Principal-in-Charge of overseeing the redesign and reintegration of the City’s waterfront into a vibrant, 
community-focused downtown asset that will drive and support outdoor recreational access, multi-
generational activities, community events, and economic development. SLR is currently leading a multi-
disciplinary team to assist the city in allocating 7 million dollars in grant funding towards waterfront 
improvements including a play fountain and skating ribbon, multi-faceted park gateway, bandshell, 
and event lawn. Services include master planning, public engagement, detailed design, permitting and 
construction oversight.
Garvan Point Improvements, Madison, CT
Principal Landscape Architect responsible for overseeing the integration of park and beach user 
improvements combined with structural and resilient seawall upgrades for 500 feet of shoreline.
Waterbury Parks Citywide, Waterbury, CT
Principal-in-Charge for city-wide park improvements including master planning, detailed design, public 
engagement, permitting assistance, and construction oversight.
Hamilton Park Master Plan and Phase One Design, Waterbury, CT
Principal-in-Charge for the redevelopment of the city’s historic 94-acre park. Soliciting public outreach 
and stakeholder engagement, coupled with reimagining the park for current and future uses, were 
cornerstones of the project. The master plan led to the first detailed design project of a new pool, 
bathhouse, and pedestrian promenade which opened in the summer of 2024.
Veterans Memorial Park Redevelopment, Middletown, CT
Principal-in-Charge leading a multi-firm team from visioning through construction for a new 6 lane lap 
pool, zero-entry activity pool, 2,500 square foot splash pad, bathhouse renovations and additions, open-
air pavilions, plazas, and improved vehicular, pedestrian, and bicycle accessibility.
Library Park, Waterbury, CT
Project Manager for the renovation planning and Phase 1 construction drawings of the iconic Library 
Park in downtown Waterbury, CT. Designed by Calvert Vaux and the Olmstead Brothers, Library Park is a 
historic park and contributing site to the nationally registered Historic Downtown District of Waterbury. 
Improvements and renovations included a new urban plaza, renovated walking paths, a fiber-reinforced 
great lawn for expanded event use, support infrastructure upgrades, and robust landscaping. All 
improvements are focused on highlighting the historic character of the site while inviting more daily 
users into the park to continue efforts in energizing the downtown of Waterbury.
Harbor Park, Middletown, CT 
Project Manager for the redevelopment of 1,600 linear feet of riverwalk and park amenities including 
walk connections, seating, art, and renovated river-front restaurant patio.
Memberships and Associations
• Council of Landscape Architects Registration Board (CLARB)
• American Society of Landscape Architecture
• Society of Ecological Restoration (SER)
• Sigma Lambda Alpha, Nu Chapter National Landscape Architecture Honor Society

Page 518

Kevin Fuselier, PLA, LEED GA
Team Leader, Landscape Architecture  | Cheshire, CT
Kevin Fuselier is a Team Leader for SLR’s Landscape Architecture group. He is a 
nationally recognized Senior Principal Landscape Architect with a strong focus on 
the planning and design of athletic facilities that elevate performance, community 
engagement, and environmental stewardship. With extensive experience in 
master planning, site design, detailing, and construction documentation, Kevin 
leads complex projects ranging from collegiate and municipal sports complexes 
to multi-use recreational fields and greenway systems. A licensed Landscape 
Architect and LEED Green Associate, he brings deep industry knowledge and 
a nuanced understanding of athletic programming, safety standards, and user 
experience. His compelling communication and collaborative approach make him a trusted partner to 
clients, engineers, and stakeholders across the sports design landscape.
Years of Experience
19 years with the firm  |  4 years with other firms
Professional Registrations
• Landscape Architect - CT, ME, NH, RI, NY, PA
• LEED Green Associate
• Post-Tension Institute (PTI) Level 1 - Slab-on-Grade Certified Inspector
Education
• BS, Landscape Architecture, University of California - Davis
• Japanese Garden & Architecture Workshop, Kyoto University
• GIS Professional Certification, University of New Haven
Project Experience
Amherst-Pelham Regional High School, Amherst, MA
Directed full project lifecycle services—including investigation, design, permitting, bidding, and 
construction—for a new running track and field facility, two high-performance natural grass 
multipurpose fields, ADA-compliant parking and walkways, irrigation systems, and LED field lighting.
Southington High School Running Track, Southington, CT
Served as Lead Landscape Architect providing technical oversight and design guidance to the Project 
Manager throughout the development of site plans and construction documentation. Responsibilities 
included reviewing grading and drainage strategies, ensuring ADA compliance, refining layout efficiency, 
and coordinating with civil and architectural teams to maintain design integrity and performance 
standards. Supported quality control and design resolution to ensure alignment with project goals and 
regulatory requirements.
Stamford High School, Stamford, CT
Directed investigations, design, bidding, and construction-phase services for the development of a 
synthetic turf baseball / multipurpose field and a synthetic turf softball field.
Sacred Heart University, Fairfield, CT
Provided design and construction-phase services for the contractor-led reconstruction of a synthetic 
turf field.
Sheehan High School, Wallingford, CT 
Managed design, bidding, and construction-phase services for the replacement of a synthetic turf field 
and reconstruction of a running track.

Page 519

Kevin Fuselier, PLA, LEED GA
Team Leader, Landscape Architecture  | Cheshire, CT
Middletown High School Track and Field, Middletown, CT
Oversaw design, bidding, and construction-phase services for the replacement of a synthetic turf field 
and reconstruction of a running track.
Quinnipiac University Baseball Field, Hamden, CT 
Led design, permitting, and construction-phase services for the conversion of a natural grass baseball 
field to synthetic turf. Additional upgrades included new dugouts, batting cages, and bullpens.
Lyme–Old Lyme High School, Old Lyme, CT
Project Manager overseeing investigation, design, permitting, bidding, and construction-phase services 
for a synthetic turf multipurpose athletic field and an elevated grandstand spectator seating area.
Portland High School Running Track, Portland, CT
Managed design, bidding, and construction-phase services for the installation of a post-tensioned 
concrete running track.
Laurel Beach Association Pickleball & Tennis Courts, Milford, CT
Oversaw design, bidding, and construction-phase services for three post-tensioned concrete tennis 
courts and four pickleball courts.
Longbrook Park Tennis Courts, Stratford, CT
Directed the removal of two clay tennis courts and construction of four new post-tensioned concrete 
courts with integrated LED lighting.
Westfield High School Tennis Courts, Westfield, MA
Supported design, bidding, and construction-phase services for the replacement of six asphalt tennis 
courts with post-tensioned concrete courts and surrounding amenities.
Welch Park Tennis Courts, Windsor, CT
Led a design / build transformation of aging asphalt tennis courts into a modern complex featuring 
post-tensioned concrete pickleball and tennis courts, a custom shade structure, and sound barrier wall.
L.P. Wilson Community Center Pickleball & Tennis Courts, Windsor, CT
Provided procurement and construction oversight for a design / build project replacing asphalt tennis 
courts with post-tensioned concrete pickleball and tennis courts, plus a shade structure and sound 
barrier wall.
Simsbury High School Tennis Courts, Simsbury, CT
Directed design, permitting, bidding, and construction-phase services for the replacement of six asphalt 
tennis courts with post-tensioned concrete courts and site amenities.
Loomis Chaffee School Tennis Courts, Windsor, CT
Tennis court specialist responsible for conceptual designs, final designs, and preparation of construction 
documents for 12 tennis courts. Analyzed multiple sites for new court construction and prepared an 
alternative analysis for the selected sites. Due to the accelerated design schedule to complete courts 
before the upcoming season, bid documents were prepared for both asphalt base and post-tension 
concrete-based construction. 
Clint Frank Field at Yale University, New Haven, CT
Project Manager providing design services for the conversion of a natural grass field to synthetic 
turf. Long jump / triple jump and pole vault runways and shot-put event areas were reconstructed to 
accommodate the new field. 
Memberships and Associations
• Sports Turf Manager’s Association (STMA)
• New England Sports Turf Manager’s Association (NESTMA)
• American Sports Builders Association (ASBA)
• Council of Landscape Architectural Registration Boards (CLARB)
• Member, Synthetic Turf Council (STC)

Page 520

John J. Hammer, PLA
Team Leader, Landscape Architecture  | Agawam, MA
John Hammer is a Team Leader for SLR’s Landscape Architecture group. His 
project experience includes streetscapes, bikeways and greenways, multifamily 
housing, commercial design, golf courses, dam removals, park and recreational 
facilities, and waterfront improvements. John’s other related experience 
includes photo simulations of concepts for bridge replacements; pier and 
dock replacements; sidewalks; lighting, trees; parking; signage; and various trail 
enhancement, location, and impact simulations. He is adept at Autodesk Civil 
3D and Autodesk Infrastructure Design Suite Premium and has experience with 
MassDOT CAD standards. He is familiar with both MassDOT and CTDOT Design 
Guides and Standard Specifications.
Years of Experience
24 years with the firm  |  5 years with other firms
Professional Registrations
• Landscape Architect - CT, MA
Education
• BLA, Landscape Architecture, State University of New York
• AAS, Horticulture Landscape Design, State University of New York
Project Experience
Westfield High School Fields, Westfield, MA
Project Manager responsible for staff oversight, design coordination, and project deliverables for the 
renovation of a running track and synthetic turf field, including bleachers and a concessions / restroom 
building, as well as a synthetic turf softball field and a synthetic turf practice field. Managed all project 
financials, including invoicing, scope amendments, and vendor payments. Acted as the primary point of 
contact among the owner, project team, and subcontractors. Conducted field observations, addressed 
design adjustments and owner-requested scope changes, and reviewed contractor pay applications and 
submittals.
Simsbury Tennis Courts, Simsbury, CT
Lead Landscape Architect responsible for preparing bid documents for reconstructing asphalt tennis 
courts.
Clinton Tennis Courts, Clinton, CT
Prepared regulatory approval drawings for Town review of asphalt tennis courts.
Enfield High School Athletic Field Natural Grass Drainage Improvements, Enfield, CT
Landscape Architect and Project Manager for the design and oversight drainage improvements to 8.3 
acres of athletic fields with poorly draining and usage restricted conditions.  At times, portions of the fields 
would be unusable for weeks with 4 inches of standing water.  A hierarchy of drainage including hard piping 
ranging for 2 inches up to 4” were installed to intercept sand slit drains on the entire facility.
Longmeadow Parks and Recreation Masterplan, Longmeadow, MA
Landscape Architect and Project Director responsible for the overall content and delivery of the project.  
Also responsible for the athletic field demand analysis, field assessments, field recommendations, and 
maintenance costs.
Powder Hollow Baseball Diamond, Enfield, CT
Landscape Architect and Project Manager for the design and oversight during reconstruction the 
Enfield High School Varsity Baseball Diamond.  The project included design of additional parking, access 

Page 521

John J. Hammer, PLA
Team Leader, Landscape Architecture  | Agawam, MA
improvements, irrigation, drainage, concessions and restrooms building. Tasks included landscape 
design, site grading, stormwater management, construction documents, bid documents, addenda, RFI’s, 
change orders, irrigation controller programming, and post construction reporting.  The project funding 
was limited to reconstructing the field.
Wolf Swamp Fields, Longmeadow, MA
Landscape Architect and Project Manager for the reconstruction of 10-acres of multi-purpose fields, 60’ 
and 90’ ball diamonds, additional parking, access improvements, signage, irrigation, drainage, and 1-year 
of post-construction monitoring of field use. Tasks included landscape design, site grading, stormwater 
management, construction documents, bid documents, addenda, RFI’s, change orders, irrigation 
controller programming, and post construction reporting.
Enfield Athletic Field Demand Analysis, Enfield, CT
Landscape Architect and Project Manager for the Athletic Field Demand Analysis and recommendations 
of field changes.  All of the athletic facilities were mapped using NEARMAP Aerials and the potential 
field layouts provided at each site.  All of the youth groups, leagues, and the School Athletic Director 
proved usage data and schedules to input into our internally developed proprietary analysis program.  
Recommendations were provided to the Town Council and School Athletic Director resulting in the 
removal of two (2) ball diamonds at the high school for the creation of rectangular fields based on a lack of 
field space for rectangular fields and over supply of ball diamonds
Ruth Elizabeth Soccer Field, Springfield, MA
Landscape Architect and Project Manager for the reconstruction of full size natural turf soccer field.  
Improvements include leveling a field that ran uphill in one direction to a traditional crowned field, 
drainage improvements, sod, additional parking, ledge removal for site line improvement into the 
facility, access and entry statement landscaping with a solar lit flagpole.
Agawam Sportsplex, Agawam, MA
Provided design services for an indoor / outdoor soccer complex. The facility includes two full-size 
synthetic turf soccer fields with air-supported structure enclosures, a prefabricated 160’ x 80’ Accessory 
Building, and a gravel parking area to accommodate approximately 200 vehicles. Tasks included 
landscape design, site grading, stormwater management, and parking.
Agawam High School Track Facility Master Plan, Agawam, MA
Landscape Architect and Project Manager for the award-winning master planning and, design, and 
construction oversight for improvements to Agawam High School’s athletic facilities and locker rooms.  
Improvements including a new running track and synthetic turf field with lighting, a new baseball 
diamond, enlarged and renovated practice fields, a new softball diamond, new post tensioned concrete 
four tennis courts incorporating a basketball court with lighting, relocation of new bleachers, new 
concessions / restroom facility / storage building, renovation of a unique two-story press box, additional 
parking, and renovated locker rooms expansion.
Mary Lynch School Soccer Field Improvements & PARC Grant Application, Springfield, MA
Provided design services to assist the city in master planning two memorial soccer fields and a Memorial 
Plaza at Mary Lynch Fields. The fields are in memorial to Officers Schiavina and Beauregard. The facility 
is to be named Schiavina and Beauregard Memorial Soccer Complex.
Enrico Fermi High School, Enfield, CT
Prepared regulatory and construction drawings for the soil remediation and construction of a synthetic 
track and football field, bleachers, softball, and baseball fields.
Cheshire Academy, Cheshire, CT
Prepared AutoCAD drawings for layout, grading, and drainage of soccer field for Town review.

Page 522

Glen Martin, PLA
Senior Landscape Architect  | Cheshire, CT
Glen Martin is a Senior Landscape Architect with 34 years of experience in 
Landscape Architecture including preparation of site plans and construction 
plans for projects including industrial, commercial, and residential developments; 
municipal and educational facilities; parks and athletic fields; affordable housing; 
and vehicle circulation.  He has worked in team environments with architects and 
engineers to produce high-quality designs and plans.  Glen previously worked at 
SLR, then known as Milone & MacBroom, Inc., as a Landscape Architect where 
he was responsible for developing site plans and presenting projects at local 
commission meetings.
Years of Experience
2 years with the firm  |  32 years with other firms
Professional Registrations
• Landscape Architect - CT, MA, RI
Education
• BS, Landscape Architecture, Pennsylvania State University
Project Experience
Middletown Track and Field Renovation, Middletown, CT
Assisting with Construction Administration for the renovation of the running track and athletic field at 
Middletown High School.
Martha Hunt Park, New Britain, CT**
Renovation of existing Little League field. Developed layout and grading plans.
Keney Park Ball Fields, Hartford, CT**
Renovation of baseball field, softball field, and two Little League fields.
Pleasant Valley School Project, South Windsor, CT**
Assisted with the site plans for the Pleasant Valley Elementary School located on Ellington Road in 
South Windsor, CT.
Moriarty School Project, Norwich, CT
Currently working on the site plans for the Moriarty Elementary School located on Lawler Lane in 
Norwich, CT.
Uncas School Project, Norwich, CT
Currently working on the site plans for the Uncas Elementary School located on Elizabeth Street 
Extension in Norwich, CT.
Highland Avenue Housing Project, Cheshire, CT
Currently working on the grading plan for the Metro Realty Group 71-unit mixed-income housing 
development located on Highland Avenue in Cheshire, CT.
New Britain Avenue Housing Project, Farmington, CT
Developed the grading plan for the Metro Realty Group 91-unit mixed-income housing development 
located at 1690 New Britain Avenue in Farmington, CT.
Railroad Square Development, Torrington, CT
Assisted with the grading plan for a parking lot for the ongoing Railroad Square Revitalization project in 
downtown Torrington.
**Denotes experience completed at another firm

Page 523

James Marchetti
Project Landscape Designer  | Cheshire, CT
James Marchetti is a Project Landscape Designer with over a decade of experience 
in residential and commercial landscaping, leading projects from concept 
through installation, and consistently achieving annual sales targets of $750K. 
Jimmy brings a strong foundation in site analysis, horticulture, and hardscaping, 
supported by technical skills in CAD, project management, and construction 
documentation. He previously owned a successful landscaping business and has 
a background in IT as a network administrator. Jimmy is currently pursuing an 
associate degree in Landscape Design at Naugatuck Valley Community College, 
where he has earned Dean’s List honors and completed a Landscape Design 
Certification. Passionate about sustainable design and client collaboration, Jimmy is committed to 
delivering visually compelling and environmentally responsible landscapes.
Years of Experience
<1 year with the firm  |  14 years with other firms
Education
• AS, Landscape Design, Naugatuck Valley Community College (expected Summer-Fall 2026)
• Landscape Design Certification, Naugatuck Valley Community College
Project Experience
John Toro Sports Complex & Beach Volleyball Courts, Torrington, CT
Supporting project development through site design and layout work for the new athletic and recreation 
areas.
Notre Dame Prep of Sacred Heart University Track Improvements, Fairfield, CT
Assisting with site design tasks and helping organize the overall layout for planned track improvements.
Amesbury High School Track & Field, Amesbury, MA
Supporting overall project updates by refining design concepts, updating the site layout, and creating 
visual renderings to help communicate the proposed improvements.
North Adams Little League Field Relocation, North Adams, MA
Assisting with site design tasks and organizing the overall layout for the new facility.
Eli Whitney Elementary School Site Alterations, Stratford, CT
Assisting with site design and layout development for site alteration work at Eli Whitney Elementary 
School.
Stafford Road, Burlington, CT
Provided support for overall site design and landscape layout.
Winterberry Gardens, Southington, CT**
Designer responsible for creating distinct and visually stunning landscape designs. Performed site 
analysis of plants and soil conditions, and also performed survey of work sites. Led teams in design, 
construction, material procurement, and installation of retaining walls, pavers, drainage, lighting, and 
plantings. Also led meetings between designers and account managers to boost productivity.  
Freelance Landscaping, Various Sites, CT**
Started and grew the company, performing landscape maintenance and design services. 
Awards
• Westport Garden Scholarship
• Waterbury Garden Club Scholarship
**Denotes experience completed at another firm

Page 524

Marie Bartels, PE
Senior Geotechnical Engineer  | Cheshire, CT
Marie Bartels is a Senior Geotechnical Engineer with experience in foundation 
design, administering subsurface explorations, earthwork and foundation 
specifications, and construction-phase services for roadway, bridge, building, and 
retaining wall foundations. She has experience preparing recommendations using 
ASHTO LRFD design code and has managed multimillion-dollar CTDOT projects 
in the geotechnical design and construction phases. Marie is also familiar with 
planning, design, and construction-phase services for small and intermediate 
development projects. 
Years of Experience
10 years with the firm  |  14 years with other firms
Professional Registrations
• Professional Engineer - CT
Education
• MS, Environmental Engineering, University of New Haven
• BS, Civil Engineering, Northeastern University
Project Experience
Pat Kidney and Woodrow Wilson Fields, Middletown, CT
Geotechnical Engineer responsible for coordinating and administering subsurface explorations 
consisting of 11 borings. Prepared a geotechnical engineering report that contained recommendations 
appropriate for the design and construction of concession stands, bleachers, grass fields, basketball 
courts, tennis courts, retaining walls, and parking areas.
Simsbury High School Athletic Facility, Simsbury, CT
Completed in two phases, Geotechnical Engineer responsible for coordinating and administering 
subsurface explorations consisting of 22 borings. Prepared a geotechnical engineering report that 
contained recommendations appropriate for the design and construction of new tennis courts, 
concession stand, synthetic turf field, and light pole structures. 
Palmer Field, Middletown, CT
Geotechnical Engineer responsible for documenting installation of helical piles adjacent to an existing 
structure, for the purpose of transferring load from the structure to suitable bearing layer. 
Deluca Field, Stratford, CT 
Responsible for coordinating and administering two borings at a failing backstop to be replaced. 
Thomaston Running Track, Thomaston, CT 
Geotechnical Engineer on-site during construction operations to provide quality assurance and quality 
control in accordance with the project specifications. Observed subgrade following grubbing and 
clearing, provided recommendations to obtain firm subgrades in unfavorable conditions, observed 
placement and compaction of up to 16-feet of fill, and evaluated site materials for reuse.
JCC Camp Settoga, Pomona, NY 
Responsible for planning and executing a subsurface exploration program of 12 borings for two 
new tennis courts, two new basketball courts, rehabilitation of parking and driveways, amphitheater 
canopy foundations, and the relocation of a 24-inch RCP.  Prepared a geotechnical engineering 
report summarizing subsurface conditions, providing geotechnical recommendations, and identifying 
construction issues.

Page 525

Kaitlin Reed, EIT
Project Geotechnical Engineer  | Cheshire, CT
Katie Reed is a Project Geotechnical Engineer with experience in geotechnical 
field exploration, review of subsurface data, site characterization, geotechnical 
analysis, design, and reporting. She has field experience supervising subsurface 
exploration and field tests as well as observing and documenting various 
construction activities. Her experience also includes compiling and processing of 
large data sets for complex, multi-disciplinary projects, research and evaluation 
of historical site data, organization and analysis of laboratory test results, and 
geotechnical engineering analysis of bearing capacity, settlement, lateral earth 
pressures, and seismic hazards.
Years of Experience
3 years with the firm  |  2 years with other firms
Professional Registrations
• Engineer-in-Training - CT
Education
• BS, Civil Engineering and Sustainable Studies, Florida Institute of Technology 
Project Experience
Greeneville Elementary School, Norwich, CT
Coordinated comprehensive, two-phase subsurface exploration program for proposed elementary 
school. Observed 41 borings, 6 bedrock cores, 22 test pits, and oversaw geophysical logging and seismic 
refraction fieldwork. Adjusted exploration program in the field as needed. Prepared shallow foundation 
design for proposed building. Developed bedrock topographic map across site to improve accuracy of 
cost estimations. Assisted in preparation of geotechnical engineering report summarizing subsurface 
conditions and providing geotechnical recommendations for building foundation, retaining wall, and 
pavement designs. 
Summit Place, Branford, CT
Observed installation of 524 Rammed Aggregate Piers (RAPs) to improve existing ground conditions 
for proposed residential development. Observed three modulus load tests to confirm RAP design 
parameters. Recorded pier locations, installation depths, and aggregate volumes. Provided geotechnical 
recommendations as needed. Prepared daily field reports and distributed to the project team.
Huckleberry Hill Elementary School, Brookfield, CT
Provided geotechnical engineering observation and support during construction. Oversaw ground 
improvement measures within 170,000 square foot parking area. Observed excavation of unsuitable 
material, provided recommendations as to the extent of unsuitable material removal, estimated the 
volume of excavated material, and provided recommendations for backfill placement. Prepared daily 
field reports and distributed to the project team.
Proposed Warehouse, Middlebury, CT
Completed due diligence investigation for proposed 25-acre warehouse. Observed thirteen borings, 
recorded soil and groundwater information, and adjusted exploration program in the field as needed. 
Evaluated suitability of re-using onsite material as fill to facilitate mass grading operations. Performed 
geotechnical design analysis and provided recommendations for proposed building foundations, parking 
lots, and retaining walls. Wrote geotechnical report including design recommendations and construction 
considerations.

Page 526

Michael F. Mansfield, LS
Practice Manager, Land Survey  |  Cheshire, CT
As Practice Manager of Land Survey, Michael Mansfield brings extensive surveying 
experience across Connecticut and eastern New York. His responsibilities include 
supervising and coordinating the work of field crews, boundary computations, land 
record searches, GPS calibrations, as-built plans, and the preparation of maps with 
an emphasis on computer applications including uniting CADD systems with field 
survey operations. 
Years of Experience
34 years with the firm  |  3 years with other firms
Professional Registrations
•  Land Surveyor - CT, NY
Education
• BS, Architectural Engineering, Wentworth Institute of Technology
Project Experience
Cheshire High School, Cheshire, CT
Survey services for the replacement of an existing athletic field with a synthetic turf field.
Revitalization of Bristol Parks, Bristol, CT
Survey services for the preparation of a master plan for the Roberts Property (50 acres) and The 
Hoppers / Birge Pond (200-acres), as well as the design of improvements to five additional parks. The 
design improvements include both active and passive recreation improvements.
Athletic Field Renovations, Weston, CT
Survey and mapping services as part of the master plan for the renovation and expansion of the Town’s 
athletic fields.
Shea McGrath Athletic Complex, Norwalk, CT
Survey services for the improvements to the Norwalk High School athletic facilities.
Sloper Outdoor Center, Southington, CT
Survey services as part of the master plan for 143-acres of land utilized for over 50 years for recreational 
purposes.
Shaker Recreational Facility, Enfield, CT
Survey services for the design of two new soccer fields and the realignment and grading of the existing 
three soccer fields.
Tolland High School Track, Tolland, CT
Provided survey services in connection with the design for the reconstruction of the running track at 
Tolland High School.
North Branford High School Athletic Facility, North Branford, CT
Survey services for the renovation of the school’s running track. Included in the scope of services was 
the design of a 400-meter synthetic running track and various site improvements.
Loomis Chaffee School, Windsor, CT
Performed topographic surveys for tennis court design.

Page 527

Scott G. Bristol, LEP, PG
Senior Principal Consultant  |  Land Quality and Remediation  |  
Glastonbury, CT
Scott Bristol is a Licensed Environmental Professional who has 36 years of 
experience including Phase I Environmental Site Assessments; Phase II and III Site 
Investigations; and remedial action planning, estimating, and performance. His 
experience also includes real estate restoration and redevelopment, regulatory 
negotiations, and regulatory interpretation and his focus is on brownfield site 
reuse/redevelopment. He has been a volunteer member of his local Brownfields 
Redevelopment Agency and served as both Chairman and Vice-Chairman. He 
is also a long-time member of Environmental Professionals of Connecticut and 
the Connecticut Environmental Forum. He has worked closely with national and 
regional commercial companies and local and state government agencies. Scott is an accomplished 
Program Manager with a proven ability to effectively organize and lead project teams.
Years of Experience
19 years with the firm  |  18 years with other firms
Professional Registrations
• Professional Geologist - NY
• Environmental Professional - CT
Education
• BS, Geology / Geophysics, University of Connecticut
Project Experience
Evaluation of the Environmental Effects of Synthetic Turf, Multiple Sites, CT
Project Manager and principal author of a year-long study of the environmental effects of crumb 
rubber in-filled synthetic turf athletic fields. This study included the collection of air, water, and 
material samples for comparison to established risk-based exposure criteria. The study also included 
an evaluation of the potential for heat transfer from the fields to the air directly above the fields. The 
study required the derivation of field methodologies for the collection of air samples. Portions of 
these methods were subsequently adopted by the Connecticut Department of Public Health and the 
University of Connecticut as well as the New York City Department of Environmental Protection and 
New York State Department of Environmental Conservation for use in subsequent studies.
Evaluation of Environmental Conditions, Multiple Athletic Field Reconstruction Projects, CT & MA
Project Director for the evaluation of numerous sites within Connecticut and Massachusetts for the 
purpose of the development or redevelopment of athletic facilities. Evaluations included studies of 
current conditions and determinations of potential negative impacts associated with development. 
Fairfield Country Day School, Fairfield, CT
Project team member responsible for the assessment of potential environmental risk posed by an 
installed synthetic playing field. Work conducted included the collection of water samples and analysis 
for chemicals of interest. Results supported a finding of no risk. Results were presented to a local 
agency over several nights of testimony.
High School Athletic Field Reconstruction, Enfield, CT
Provided overall project support and opinion regarding compliance with a remediation action plan to 
isolate pesticide containing soils. Worked closely with in-house construction managers to ensure timely 
acceptance of project approvals thereby enabling achievement of project goals and deadlines.

Page 528

Thomas A. Knowlton, PE
Principal Water & Wastewater Engineer  | Cheshire, CT
Thomas Knowlton brings over 28 years of field and office experience in the project 
management, planning, design, and construction administration for water and 
wastewater projects. He has experience in design-bid-build projects of all sizes 
and has an in-depth understanding of water and wastewater pump stations, 
rehabilitation of pipelines for both water and sewer systems, and water storage 
tanks. He has experience in private, municipal, and federal projects including 
multiple military installations that required background checks and security 
clearance.
Years of Experience
14 years with the firm  |  14 years with other firms
Professional Registrations
• Professional Engineer - CT, NM
Education
• BS, Civil Engineering, University of New Mexico
Project Experience
Forman School, Litchfield, CT
Designed a restroom facility with concession stand and attached pavilion for the new artificial turf field 
designed by SLR. Project included design of potable water, sewer, electrical, and local permitting.
Hamilton Park Demo and Pool, Waterbury, CT 
Provided water and sewer Quality Assurance and Quality Control services for the park’s demolition.]
Sacred Heart University, Fairfield, CT
Performed sewer flow estimate for WPCA approval of new development.
Yale University, New Haven, CT
Project Manager that performed field investigation and provided recommendations for basement 
flooding.
1B Interdistrict Magnet School, Stamford, CT
Design of new water services for domestic and fire protection in accordance with the City of Stamford 
and Aquarion Water Company requirements. Designed fire hydrant and valve layout for fire protection 
around the school.
New Lebanon Elementary School, Greenwich, CT
Design of new water services for domestic and fire protection in accordance with the Connecticut 
Water Company requirements. Designed new 1,000 gallon buried grease interceptor for new kitchen 
facilities and connection to existing town sewer.
Adams Middle School, Guilford, CT
Designed irrigation pump replacement for sports field irrigation. The new pumping system included an 
insulated enclosure and a variable frequency drive pump and controls to deliver a range of flows to the 
spray irrigation system for an existing baseball field with a connection stubbed out for future softball 
and soccer fields.
Waddell Elementary School, Manchester, CT
Design of new fire hydrant and water main tap in accordance with the Town of Manchester 
requirements. Designed new sanitary sewer collection system and connection to existing town sewer. 
Designed new 1,000 gallon buried grease interceptor for new kitchen facilities.

Page 529

Ryan McEvoy, PE
Principal Civil Engineer  | Cheshire, CT
Ryan McEvoy is a Principal Civil Engineer with 25 years of experience including 
the design and inspection of sewers and roadways; stormwater design and 
remediation; culvert design; and municipal reviews.
Years of Experience
24 years with the firm  |  1 year with other firms
Professional Registrations
• Professional Engineer - CT
Education
• BS, Civil & Environmental Engineering, University of Connecticut
Project Experience
Bates Woods Park, New London, CT
Engineering services for the expansion of the parking areas and site improvements. 
Rentschler Field, East Hartford, CT
Performed drainage analysis, culvert design, detailed earthwork analysis, and contaminated soil 
mitigation in support of large-scale parking and circulation improvements.
Powder Ridge Ski Area, Middlefield, CT
Design of snowcat access road and culvert crossing.
O’Sullivan’s Island, Derby, CT
Provided assistance with city staff to obtain state grants for the design and construction of a transient 
boating facility at the confluence of the Housatonic and Naugatuck Rivers.
Greens Farms Academy Athletic Facilities, Westport, CT
Provided engineering design services for the renovation of the school’s baseball fields, tennis courts, 
soccer fields, and indoor squash courts.
Bristol Parks Master Plan and Design, Bristol, CT
Engineering services in coordination with the design of active and passive park improvements at several 
city parks. 
St. Joseph’s College, West Hartford, CT
Performed drainage analysis and storm capacities on track improvements and ballfields.
Enfield High School, Enfield, CT
Site planning services and engineering services associated with the development of a 305,000 square 
foot high school consolidation including permitting and construction plans and logistical phasing to 
support the continued use of the school during construction. The site design included a complete 
redesign of on-site parking and stormwater management as a result of the 120,000 square foot 
addition.
Guilford High School, Guilford, CT 
Assisted with the site design of a new high school in Guilford, Connecticut, adjacent to the existing high 
school. Due to site constraints, the new school has to be located within 20 feet of the existing school, 
and the existing school needed to remain in operation while the new school was constructed. This 
presented many challenges regarding utility infrastructure, access, safety, phasing, erosion control, and 
stormwater management on site. 

Page 530

Andrew Goralski, PE
Associate Civil Engineer  | Cheshire, CT
Andrew Goralski is an Associate Civil Engineer who facilitates site civil-specific 
projects that range from preliminary conceptual site plan design to full-scale 
construction-level design. With a background in surveying as well as being skilled 
in AutoCAD Civil 3D, Andrew brings a very technical eye to all projects.
Years of Experience
11 years with the firm 
Professional Registrations
• Professional Engineer - CT, MA
Education
• BS, Civil Engineering, University of Connecticut
• BS, Environmental Engineering, University of Connecticut
Project Experience
Westfield Athletic Fields, Westfield, MA
Responsible for Civil Engineering and Quality Control and Assurance. Reviewed plans, profiles, 
watersheds, engineering report, all of the utility design, and redlined plans and specifications.  
Coordinated details with the plans, specifications, and opinion of cost. Assisted with updating opinions 
of cost.
Amesbury High School Baseball, Amesbury, MA
Assisted with Civil Engineering for the ball diamond. Reviewed plans, watersheds, developed plans, and 
details.
Amherst-Pelham School, Amherst, MA
Assisted with Civil Engineering for the ball diamond. Reviewed plans, watersheds, developed plans, and 
details.
Stamford High School Multipurpose Synthetic Turf Field, Stamford, CT
Assisted in subsurface drainage and storage systems associated with the construction of two synthetic 
turf fields.
Quinnipiac University Baseball Field Improvements, Hamden, CT
Aided in subsurface drainage and storage systems associated with converting an existing grass baseball 
field to synthetic turf.
Forman School Synthetic Turf Field, Litchfield, CT
Assisted in site layout and design of subsurface drainage and storage systems associated with 
converting an existing multi-purpose grass field to synthetic turf.
Mark T. Sheehan High School Track & Field Improvements, Wallingford, CT
Assisted in preliminary design for the replacement of a track and turf field.

Page 531

Molly Berardi, PE
Associate Hydrology & Hydraulics Engineer  | Cheshire, CT
Molly Berardi is an Associate Hydrology & Hydraulics Engineer in the Civil 
Engineering Department with experience in a variety of civil design projects 
including athletic fields, public and private site development, educational facilities, 
and residential housing. Her background includes the design of stormwater flood 
control solutions and “green” shoreline and streambank restoration solutions. 
Years of Experience
7 years with the firm  |  1 year with other firms
Professional Registrations
• Professional Engineer - CT, RI, NY
Education
• M.Eng., Environmental Engineering, Rensselaer Polytechnic Institute
• BS, Environmental Engineering, Rensselaer Polytechnic Institute
Project Experience
Athletic Field Renovation – Greenwich Country Day School, Greenwich, CT
Led stormwater management design for the creation of two new athletic fields at Greenwich Country 
Day School following the Greenwich Stormwater Drainage Manual, including design of infiltration 
facilities for water quality treatment and retention. Worked with the Town Engineer to develop models 
allowing for the use of field infiltration rates within the hydrologic models of the site to reduce 
detention facility footprints.
Sacred Heart University Hockey Arena, Fairfield, CT
Assisted with stormwater management and drainage design for Sacred Heart University’s new hockey 
arena. Conducted hydrologic and hydraulic analysis, including watershed delineation, storm drainage 
design, hydrologic and hydraulic modeling, and design of stormwater detention facilities.
Farmington High School, Farmington, CT
Led stormwater management and drainage design for the new high school. Conducted hydrologic and 
hydraulic analysis, including watershed delineation, storm drainage design, hydrologic and hydraulic 
modeling, and design of stormwater detention facilities. Assisted with CTDOT OSTA drainage 
certification.
Slate Upper School, North Haven, CT
Led stormwater management and drainage design for the new upper school. Conducted hydrologic 
and hydraulic analysis, including watershed delineation, storm drainage design, hydrologic and hydraulic 
modeling, and design of stormwater detention facilities.
Latimer Lane School, Simsbury, CT
Led stormwater management and drainage design for the renovation and expansion of Latimer Lane 
School. Conducted hydrologic and hydraulic analysis, including watershed delineation, storm drainage 
design, hydrologic and hydraulic modeling, and design of stormwater detention facilities.
Proposed Upper Dorm – The Ethel Walker School, Simsbury, CT
Led stormwater management and drainage design for the new Upper Dorm at The Ethel Walker School. 
Conducted hydrologic and hydraulic analysis, including watershed delineation, storm drainage design, 
hydrologic and hydraulic modeling, and design of stormwater detention facility expansion. 

Page 532

Kishor Patel, PE, P.Eng.
North America Practice Leader, Structural & Geotechnical Engineering  
| Cheshire, CT
As North America Practice Leader, Structural & Geotechnical Engineering, Kishor 
Patel has a very diverse and impactful role in structural engineering. His work 
on bridges, retaining walls, greenhouses, fish ladders, and small dams requires 
extensive expertise and attention to detail. Conducting structural analysis and 
inspections for various projects including retaining walls, foundations, bridges 
abutments, dams, and buildings shows his extensive knowledge and experience in 
the field. Kishor routinely conducts NBIS-inspections for former railroad bridges 
and culverts for greenway and trail projects also highlight his commitment to 
safety and sustainability.
Years of Experience
26 years with the firm
Professional Registrations
• Professional Engineer (PE) - AL, CT, CO, FL, ID, MA, MD, ME, MI, NH, NJ, NY, OR, RI, SC, TN, TX, UT, 
VT, WA
• Professional Engineer (P.Eng.) - AB, BC, ON
Education
• BS, Civil Engineering, Concordia University
Project Experience
Rockwell Park Bridge & Building Inspection, Bristol, CT
Responsible for performing structure condition inspections for an existing bathhouse and two roadway 
bridges at Rockwell Park.
Windsor High School Tennis Courts, Windsor, CT
Structural Engineer that assisted with design for the replacement of existing asphalt tennis courts and 
the addition of 6 new tennis courts.
Memorial Park Tennis & Pickleball Courts, Bethlehem, CT
Structural Engineer who assisted with design to replace the existing bituminous tennis courts and 
upgrading the adjacent parking lot and entry drive.
Holmes Playground Dam Removal, Town Brook Restoration, and Newfield Street Bridge, 
Plymouth, MA
Project Manager responsible for the design of the Newfield Street Bridge as part of the removal of 
Holmes Dam and restoration of the stream and adjacent playground park on Town Brook. 
Chase Park, Waterbury, CT
Structural Engineer that assisted with design for the reconstruction of six tennis courts utilizing post-
tensioned concrete for improved durability and performance.
Shea-McGrath Athletic Complex, Norwalk, CT
Provided structural design for improvements to the Norwalk High School athletic facilities. The project 
included a new all-weather surface track, a synthetic-surfaced multiuse athletic field, six tennis courts, 
relocation and code update of bleachers (home side only) now located at Andrews Field, field lighting, 
a new concession / rest room / storage building, expansion of on-site parking, provisions for a new 
emergency access roadway, walkways, landscaping, and utility infrastructure support facilities.
High School Athletic Field Reconstruction, Enfield, CT
Provided engineering services for the design of bleachers and the foundation for a scoreboard update of 
35 acres of playing fields at Enfield High School and Fermi High School.

Page 533

Shelley Plude, MS, PE
Principal Structural Engineer, Bridge Design Lead  | Cheshire, CT
As a Principal Structural Engineer, Bridge Design Lead, Shelley is responsible 
for structural calculations and analysis, preparation of construction documents, 
existing conditions inspections/reports, structural type studies, and day-to-day 
project management on a variety of bridge projects including municipal, state, and 
federally funded rehabilitation, superstructure, and full bridge replacements. Other 
projects include retaining walls and bulkheads, pedestrian facilities, and dams and 
fishways. While completing her master’s at the University of Connecticut, she 
served as a graduate research assistant responsible for conducting research in the 
field of damage detection as a part of the bridge health monitoring program. 
Years of Experience
14 years with the firm
Professional Registrations
• Professional Engineer - CT, ID, MA, ME, NH, NY, OR, VT, WA
• New Hampshire DOT LPA Certified
Education
• MS, Structural Engineering, University of Connecticut
• BS, Civil Engineering, University of Connecticut
Project Experience
Meriden Green Pedestrian Bridges, Drainage Improvements & Site Remediation, Meriden, CT 
Provided engineering services for a 300 foot, multi-span pedestrian bridge, eight retaining walls up 
to 200 feet long including a utility room for park facilities, two pedestrian footbridges, and culvert 
headwalls for the redevelopment of a 14-acre site in downtown Meriden as a part of the Harbor Brook 
Flood Control Project. The extensive retaining walls were needed to provide pedestrian access and 
connectivity between surrounding businesses and the neighboring Amtrak train station across the 
new Harbor Brook channel and flood storage area. Other tasks included inspection of the existing 
Harbor Brook culvert, the preparation of structural plans and design calculations, and cost estimating. 
Construction phase services included construction administration and shop drawing review as well as 
part-time construction inspection services.
Ledgebrook Condominiums – Timber Boardwalk Replacement, Norwalk, CT
Provided engineering and design services for the replacement of a timber boardwalk at Ledgebrook 
Condominiums in Norwalk, CT. Tasks included the inspection of existing conditions, preparation of 
construction documents, and cost estimation.
City Point Yacht Club, New Haven, CT
Prepared preliminary design plans and permit drawings for a sheeting project at the City Point Yacht 
Club in New Haven. Tasks included the design of steel sheet piling and tiebacks, preparation of 
preliminary design plans, and cost estimating..
Fuessenich Field Bleacher Replacement, Torrington, CT
Prepared structural plans and details for the replacement of wooden bleachers at Fuessenich Field.
Berry Field Type Study, Spartanburg, SC
Prepared a type study for Berry Field Park in Spartanburg, SC. Tasks included the evaluation of the 
existing concrete bleachers and the development of several rehabilitation and replacement alternatives.

Page 534

     
 
 
Background 
Mr. Gendreau has over fifteen years of experience in the MEP consulting industry 
as an electrical engineer and manager. He has designed and overseen a wide 
variety of infrastructure, building & energy projects throughout his career, in roles 
spanning from junior electrical engineer to Vice President of a large multi-
discipline engineering firm.  He has designed and managed some of the largest 
projects built in Connecticut and Massachusetts, and has a specific passion for 
renewable energy systems, having personally overseen the design of over 250 
megawatts of photovoltaic systems.  The part of design that Steve enjoys most is 
solving complex electrical engineering projects while incorporating on the client’s 
needs.  He enjoys the challenge of finding solutions that strike a delicate balance 
between being cost conscious, code compliant and maintainable.  Mr. Gendreau 
founded SG Engineering, LLC in 2017. 
 
 
 
Education 
Bachelor of Science, Electrical Engineering, University of Connecticut, Storrs, CT, 
2005 
 
 
 
Professional Engineering Licenses 
▪ Connecticut #27497 
▪ Massachusetts #49055 
 
Steve Gendreau, P.E. 
 
Southington, CT 
 
sgedesign.com 
 
203-215-9448 
 
 

Page 535

Section 5

Page 536

Services Expected of the Town
Services Expected of the Town
The Town shall provide a backhoe/excavator and operator to dig test pits, if necessary. If the Town 
prefers, SLR can retain a landscape contractor to dig and restore test pits.  A separate scope 
amendment can be prepared should this be needed.

Page 537

Section 6

Page 538

APPENDIX A
Cost Proposal
Name of 
Engineering Firm: ___________________________________________________
Services Needed
On-Call Engineering and Related Services
Please indicate your firm’s hourly fees over the five-year period of the contract
Billing Category Hourly Billing Rate
Project Manager ________________
Chief Engineer ________________
Engineer ________________
Technician Support ________________
Clerical/Researcher ________________
Other ________________
Other Expenses (if applicable):
Identify any other categories and costs required to provide Engineering and On-Call 
services that are not included above:
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
Rate Adjustments: All hourly rates and fee schedules are valid through December 31 of the 
calendar year in which this Agreement is executed. Thereafter, rates shall increase by five 
percent (5%) annually. Work performed after a rate adjustment shall be billed at the 
Consultant's then-current average billing rates for similar personnel classifications and services. 
Page 7 of 7

Page 539

  
 
1 
2026 US Discounted Rate Schedule 
SLR PROFESSIONAL SERVICES HOURLY RATE 
Senior Advisor $350 
Senior Principal $295 
Principal 2 
Principal 1 
$275 
$260 
Senior 2 
Senior 1 
$245 
$235 
Associate 2 
Associate 1 
$215 
$205 
Project 2 
Project 1 
$185 
$175 
Staff 2 
Staff 1 
$165 
$155 
Chief Inspector 
Senior Inspector 
Inspector 
$225 
$200 
$185 
Land Surveyor 
Party Chief 
Crew Member 
$180 
$160 
$140 
Senior Draftsperson/Technician  
Draftsperson/Technician 
$155 
$150 
Administrative $115 
Note: Time will be billed to the nearest ¼ hour 
  

Page 540

  
 
2 
REIMBURSABLE EXPENSES RATE 
Bond Prints  $ 2.00  Each  
Large Bond Prints  $ 3.00  Each  
Fixed Line Mylars  $75.00  Each  
Color Plots/Mylars  $30.00  Each  
Large Color Plots/Mylars  $45.00  Each  
Photocopies –8½ x 11  $ 0.12  Per Copy  
Photocopies – 11 x 17  $ 0.24  Per Copy  
Color Copies – 8½ x 11  $ 1.25  Per Copy  
Color Copies – 11 x 17  $ 2.25  Per Copy  
Binding 0-200 pages  $ 6.00  Per Bound Copy  
201 or more pages  $ 7.50  Per Bound Copy  
Board Mounting  $25.00  Each  
Each FedEx – $0 to $25  $25.00  Per FedEx  
FedEx – Over $25  Cost  Per FedEx  
Mileage  IRS Rate  Per Mile  
 
OTHER DIRECT CHARGES RATE 
Subcontractors, vendors, and other expenses Actual cost +15% 
Administrative charge 3% of Labor Charges 
Expert witness testimony services (court and mediation) 50% Labor Surcharge 
 

Page 541

Making Sustainability Happen SLRCONSULTING.COM

Page 542

westonandsampson.com
PROPOSAL | July 2026
Professional 
Engineering 
Services
712 Brook Street | Rocky Hill, CT 06067

Page 543

 
 
 
 
 
 
 
– 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Contents 
0 Cover Letter   
1 Firm Qualifications  
2 Key Personnel  
3 Relevant Experience  
4 References  
5 Project Understanding  
6 Services Expected by the Town  
7 Proposed Fee Schedule  
8 Response to Evaluation Criteria  
  

Page 544

  
 
westonandsampson.com  
 
 
712 Brook Street, Suite 103, Rocky Hill, CT 06067 
Tel: 860.513.1473    
July 24, 2026   
 
Mike Walsh, Town Manager 
Town Manager’s Office 
15 North Granby Road 
Granby CT 06035 
 
Re: Professional Engineering Services  
Dear Mike Walsh: 
 
Weston & Sampson is pleased to submit this proposal to the Town of Granby for professional on-call 
engineering services that will provide planning, design, engineering, and construction of a 
replacement running track and adjacent baseball and softball fields at the high school and middle 
school complex, a bathroom facility at Salmon Brook Park, pickleball courts at Salmon Brook Park, the 
assessment and administration of a sewer pump maintenance project, and other future tasks. Weston 
and Sampson’s team will be led by myself and my team of sports facility specialists who will apply 
their extensive professional experience in running tracks, public recreational bathroom facilities, 
pickleball courts, and oversee your sewer pump maintenance project, and any other tasks you may 
have during the duration of this contract.    
We welcome the opportunity to build upon our longstanding relationship with the Town of Granby. Our 
past work includes master plan studies for Granby High School and Granby Memorial Middle School. 
Most recently, we supported Granby’s Board of Education with environmental exploration services at 
the high school, and we look forward to continuing this partnership by supporting the town’s broader 
municipal capital improvement needs. 
Our Specialized Team 
Our team brings extensive knowledge and industry leading expertise in sports field and athletic 
renovation and new construction projects just like your projects. Our team averages more than 25 
years of experience in the planning and design of sports facilities and associated recreational 
amenities, specializing in high-performing, multi-generational spaces. As the team leader/project 
manager, Ryan Chmielewski, RLA, ASBA, has an extensive background in designing and constructing 
sports facilities across New England, Atlantic coast, and specifically Connecticut. His experience 
includes the planning and design of running tracks; natural and synthetic turf athletic fields for clients 
in Cheshire, North Haven, and East Hartford, Connecticut; and pickleball courts in Greenwich, Bristol, 
and Quinnipiac University, Connecticut, as well as Springfield International Charter School in 
Massachusetts, among others. 
Our Local Knowledge & Experience 
As you are aware Weston & Sampson has supported the Town of Granby and many municipalities just 
like yours, addressing challenges through planning, permitting, design, and construction. Our team is 
located just 33 minutes away in Rocky Hill, Connecticut, and are able ensure timely responsive, 
community‑focused services. Our office location gives us the advantage of proximity to you, and with 
90+ talented designers and engineers positioned locally, we are ready immediately and have capacity 
to complete the services needed for your projects on time. Additionally, we are proud to have 
delivered sports field and recreational facilities consulting services to communities across 
Connecticut, including Bloomfield, Bristol, Cheshire, Columbia, Darien, Ellington, Greenwich, 
Killingworth, Middletown, North Haven, Portland, and Simsbury.  

Page 545

Page 2 
 
 
 
We have developed our approach to providing responsive and timely services for your assignments, 
and our project team consistently meet regulatory-driven deadlines. Because of these initiatives, 
Weston & Sampson is poised to provide high-quality services for any assignment. 
 
Commitment to Timely & Successful Project Completion 
To meet your scheduled milestones and possible budget constraints, our project management team 
will actively oversee progress, monitor performance and quality of work to support the needs of your 
projects. This includes managing subconsultants and ensuring all project components align with the 
planned schedule, quality of work, and budget.  
 
Additionally, we will: 
 Conduct early and often project budget reviews to maximize design value without compromising 
programming. 
 Maintain a transparent schedule with clear milestones for efficient project management. 
 Work closely with the town and stakeholders to align the final design with current and future needs. 
 
Our extensive project experience and talented team of professionals make Weston & Sampson a 
valuable partner and advocate for you. We are well positioned to provide the services required for the 
requested professional services. Through strong cooperation and collaboration, we seek to achieve 
outstanding, enduring results and exceed your expectations. Please do not hesitate to contact either 
of the undersigned regarding our qualifications or our submittal.  
Sincerely, 
WESTON & SAMPSON ENGINEERS, INC. 
 
 
Raju Vasamsetti, PE    Ryan Chmielewski, RLA, ASBA 
Regional Manager    Team Leader | Landscape Architecture 
860-986-7933 | VasamsettiR@wseinc.com  860-616-6497 | chmielewski.ryan@wseinc.com  
 
Notes: Weston & Sampson has carefully reviewed the Town of Granby’s RFP and would appreciate the 
opportunity to negotiate a mutually agreeable indemnification clause if we are successful in securing 
this contract. Our requested changes for the Defense, Hold Harmless and Indemnification section of 
the RFP are listed below. 
 In Line 5, insert the word “reasonable” between “including” and “attorney” 
 In Line 7, after the period, add the following sentence: “Notwithstanding the foregoing, the duty to 
defend shall not apply to professional liability claims; however, the successful proposer shall be 
responsible for reimbursing the indemnified party, at the time of judgment, award, or settlement, for 
reasonable defense costs incurred in a proportionate amount equal to the successful proposer’s 
percentage of fault. 
 In Line 11, strike the word “sole”. 

Page 546

Firm Qualifications 
Contact Information 
Team Leader/Project Manager Ryan 
Chmielewski, RLA, ASBA, will serve as our 
primary contact with the Town of Granby.  
 
Introduction to Weston & 
Sampson 
For more than 125 years, Weston & Sampson 
has provided cost-effective, innovative 
solutions to our client’s challenges. We have 
completed hundreds of successful athletic 
facility and recreation projects where athletes 
learn, play, and compete.  
Designing public sports and recreational 
facilities including natural and synthetic turf 
fields, restroom facilities, and supporting 
features is one of our specialties, with over 
$100 million in sports field/facility and 
recreation improvement projects successfully 
realized. Our firm is well positioned to provide 
the Town of Granby with on-call engineering 
services for design and engineering services 
supporting the planning, permitting, and 
construction of athletic facility improvements 
and for a variety of your other capital 
improvement projects. As a full-service, multi-
disciplinary consulting firm with more than 
1,000 professionals, we provide comprehensive 
capabilities that span project assessment and 
planning from concept development through 
permitting, design, construction, and long-term 
operation and maintenance.  
A top-ranked US design and environmental 
firm, according to Engineering News-Record, 
Weston & Sampson is proud of our steady 
record of growth and comprehensive 
engineering excellence. Our firm has also been 
widely recognized by the American Public 
Works Association (APWA) and the American 
Council of Engineering Companies (ACEC), in 
further testimony of our creativity and 
performance. 
 
Office Locations  
Headquartered in Reading, Massachusetts, 
Weston & Sampson maintains regional offices 
throughout the Northeast and along the East 
Coast. Established in 1998, our primary office 
Ryan Chmielewski, RLA, ASBA 
Team Leader/Project Manager 
860-616-6497  
chmielewski.ryan@wseinc.com 
712 Brook Street, Suite 103, Rocky Hill, 
Connecticut 06067 

Page 547

Granby, CT | Professional Engineering Services 
 
 
supporting this project is Rocky Hill, 
Connecticut, located at 712 Brook Street, Suite 
103, Rocky Hill, Connecticut 06067.  
Discipline Capabilities 
  
 
Our design studio is dedicated to creating 
dynamic, high-quality sports venues. Sports 
and Recreation facilities are not only a core 
focus of our practice, but they also serve as 
vital spaces that strengthen connections within 
the communities they bring together. 
On-Call Services 
Our firm understands the technical complexities 
of working within an on-call environment. 
Assignments can come at any time, and the 
type of work can vary widely. It is critical that the 
on-call staff be 1) experienced, 2) available, and 
3) responsive. Our proposed team is 
accustomed to performing under these 
conditions, whether through formal on-call 
assignments or through long-term active 
relationships with existing clients. 
For many of our clients, our services have 
included support for long-term contracts and 
arrangements that have been in place for many 
years. Presently, our Connecticut office is 
engaged under on-call contracts with 
numerous public and private entities throughout 
Connecticut and western Massachusetts. 
Weston & Sampson understands the wide 
range of needs and sense of urgency that 
come with task-based assignments, having 
provided similar services to many Connecticut 
municipalities and agencies. As a result, this 
level of attentiveness is instilled in every 
member of our staff assigned to your projects, 
and we strive for total client satisfaction in terms 
of the depth of analysis, quality of 
presentations, accuracy of information, and 
professionalism of our staff. We consider the 
municipality to be an integral part of the project 
team, and, as such, we will maintain close 
coordination with administrative staff 
throughout the on-call contract to respond 
immediately to questions and concerns and 
ensure project success. 
Our extensive in-house capabilities 
include: 
• Sports Facility Assessment, Design, 
Bidding, & Construction Oversight 
• ADA-related Inventory, Analysis, & 
Accessible/Inclusive Design/Compliance 
• Public Facilities Planning & Design 
• Architecture & MEP 
• Structural Engineering 
• Site/Civil Development 
• Landscape Architecture, Planning & 
Restoration 
• Active & Passive Recreation Facilities  
Planning, Design, & Construction 
• Geotechnical Engineering 
• Aquatics Design & Engineering 
• GIS & Digital Mapping  
• Sustainable Design & Green 
Infrastructure 
• Regulatory & Enforcement Assistance 
• Transportation & Traffic Engineering 
• Construction Inspection, Oversight, & 
Management  
• Communitywide & Site-Specific Master 
Planning 
• Peer Review & Developmental Review  
• Hydrology & Hydraulics  
• Wastewater Collection & Treatment 
• Watershed & Stormwater Management  
• Environmental Site 
Assessment/Demolition/Remediation 
• Environmental Compliance & Permitting 
• Wetlands Replication & Restoration 
• Climate Resilience 
• Renewable Energy 
• Water Supply Development / Treatment / 
Pumping / Distribution 
• Water / Wastewater System 
Operation/Maintenance/Repair 
• Solid Waste Planning, Design & 
Management 

Page 548

Granby, CT | Professional Engineering Services 
 
 
 
Sports Facilities 
Our specific experience includes assessing and 
designing athletic/field amenities that provide 
critical outlets for athletic competition and 
enjoyment. Of significant importance to our 
approach is addressing the recreation needs 
for each community. Many communities’ fields 
serve permitted sports leagues as well as less 
formal recreational pursuits, like a pickup game 
of football or spontaneous footrace. Therefore, 
Weston & Sampson develops specific, targeted 
plans that identify strategies for improving 
recreational and athletic opportunities. From 
single-sport fields to multi-sport complexes, our 
experienced staff ensure that every project 
meets industry standards, specifications, and 
community expectations. Our comprehensive 
services include sports field/facility design, 
landscape architecture, architecture, civil, 
structural, MEP engineering, construction 
oversight, and more. In addition, all our designs 
achieve ADA compliance and eligibility for 
federal, state, and local matching grants. 
Our ability to design facilities in a pragmatic, 
feasible manner is demonstrated by the large 
number of projects we have successfully 
completed, and our propensity for continued 
service in nearly all the communities in which 
we work. 
To complement our athletic facility design 
capabilities, we prepare clear and accurate 
construction document packages to ensure 
that projects are not only constructed 
successfully but also have the capacity to be 
maintained with the resources available. 
Fields & Stadiums 
Weston & Sampson’s athletic and recreational 
fields experience and services include: 
• Design & construction of individual fields to 
multi-sport complexes, including soccer, 
football, LAX, field hockey, cricket, rugby, 
baseball, softball 
Current On-Call Contracts 
• Town of Avon, CT 
• Town of Bloomfield, CT 
• Bristol Water & Sewer Dept 
• Town of Burlington, WPCA, CT 
• City of Danbury, CT 
• City of Derby, CT 
• Town of East Hartford DPW, CT 
• East Lyme Sewer & Water 
• Town of Enfield, CT 
• Town of Greenwich, CT 
• Town of Hartford, CT 
• Town of Mansfield, CT 
• City of Meriden, CT 
• City of Milford, CT 
• Borough of Naugatuck, CT 
• City of New Britain, CT  
• Greater New Haven WPCA 
• Town of North Branford, CT 
• City of Norwalk, CT 
• City of Norwalk First Taxing District, CT 
• Norwalk Redevelopment Agency 
• City of Shelton, CT 
• Town of Southbury, CT 
• City of Springfield, MA 
• Town of Thomaston, CT 
• West Springfield DPW MA 
• City of Waterbury, CT 
• Town of Westbrook, CT 
• CTDAS 
• CTDOT  
• NVCOG 
• Eversource Energy 
• Aquarion Water Company 
• CT Water Company 
 
Our goal is to create accessible, resilient, 
and exciting spaces. Our clients are our 
partners; in our athletic facilities work, we 
remain sensitive to community concerns and 
understand the need to serve every student, 
staff member, parent/guardian, and visitor. 

Page 549

Granby, CT | Professional Engineering Services 
 
 
• Stadium & grandstand/bleacher facility 
design  
• Restroom & storage facility design  
• Sports lighting systems  
• Field renovations 
• Irrigation design  
• High-performance natural grass  
• Infill synthetic turf  
• Field-type needs evaluation  
• Troubleshooting existing fields 
• Community-wide athletic field assessments 
Tracks & Trails 
Our track experience and services include: 
• Analysis of numerous track systems  
• Construction of multi-lane tracks  
• Surfacing/resurfacing of natural & synthetic 
tracks  
• Running, walking, fitness, & multi-use trails 
• Stabilization with geotextiles 
 
 
Courts 
Our court experience and services include: 
• Design & construction of single, multi-court 
& multi-use courts, including tennis, 
pickleball, basketball, handball, volleyball, 
futsal & roller/street hockey 
• Asphalt & post-tension concrete 
• Refurbishment & replacement of features 
• Players’ benches & canopies 
• Backboards & rims 
• Netting 
• Fencing 
• Electrical & lighting systems 
• Storm drainage systems 
• Retaining walls 
• Related site amenities & furnishings  
Americans with Disabilities Act (ADA)  
Weston & Sampson maintains a thorough, up-
to-date knowledge base of the ADA. Our 
comprehensive designs/projects for various 
communities meet all applicable federal and 
state guidelines. These designs ensure ADA 
accessibility/compliance and programming for 
users of all ages. From single-sport courts and 
fields to comprehensive athletic stadium 
complexes, our experienced staff ensure every 
project meets the industry’s specifications, 
standards, and community expectations.  
Innovative Solutions/Approaches  
Weston & Sampson stays at the forefront of 
design and trends in athletic/recreational 
improvement and routinely provides innovative 
design plans and strategies to meet the 
individual needs of our clients. We draw from 
the multi-disciplinary experience, skills, and 
resources of our firm to address project-
specific, location-specific challenges. Our 
designers work with our infrastructure resiliency 
 Project Highlight:     High School & Middle School Athletic Facilities, North Haven, CT 
North Haven, CT 
Cheshire, CT 

Page 550

Granby, CT | Professional Engineering Services 
 
 
experts to address predicted sea level rise and 
storm surge in our designs and provide flood 
protection and climate mitigation. In addition, 
working with our stormwater engineers, we 
implement innovative low-impact development 
(LID) designs and stormwater collection / 
storage plans at sites across New England. Our 
innovative design solutions also include our 
recent advances in designing universally 
accessible parks and playgrounds to 
accommodate inclusive play and multi-
generational use. 
Stormwater  
Weston & Sampson provides stormwater 
management & hydrogeology services that 
include drainage inventory and assessment, 
flood control, water resources planning, 
watershed modeling, and permitting. We are 
currently assisting many communities in the 
development and implementation of EPA-
approved programs to comply with required 
minimum control measures. Our experience 
has provided us with first-hand knowledge of 
stormwater best management practices, which 
enables us to advise and assist our clients with 
challenging stormwater quality and quantity 
issues. 
Weston & Sampson has decades of experience 
assisting communities in meeting their 
stormwater needs on small- and large-scale 
projects. Within the past two decades alone, 
our stormwater and water quality professionals 
have provided stormwater engineering services 
for more than 80 cities and towns. This 
experience ranges from addressing individual 
residential needs to system-wide drainage 
planning and design, including designs for park 
and recreation properties. We provide 
traditional engineering services such as 
evaluation, design, and construction of 
drainage infrastructure, but we are also at the 
forefront of our industry in offering state-of-the-
art services such as digital data collection / 
management and incorporating green 
practices/LID into our designs. Additionally, we 
have assisted many communities with MS4 
compliance and have an in-depth knowledge of 
the MS4 permit. 
Site / Civil Engineering 
Weston & Sampson has provided site/civil 
engineering services for a multitude of projects 
of varying complexity for municipal clients 
throughout Connecticut and the Northeast. 
These services have included multi-use paths, 
roadway design, circulation improvements, 
preparation of contract bid documents, and 
construction support. Other improvements 
designed include roadways, bridges, parking 
lots, ornamental illumination, wayfinding 
signage, and associated site and utility 
relocation work. 
Weston & Sampson offers extensive drainage 
services and can assist with a multitude of 
diverse drainage-related issues. We have 
decades of experience assisting communities, 
agencies, and private entities in meeting their 
drainage needs on small- and large-scale 
projects. This experience ranges from 
addressing individual residential needs to 
system-wide drainage needs. We provide 
traditional engineering services such as 
evaluation, design, and construction of 
drainage infrastructure but are also at the 
forefront of our industry in offering state-of-the 
art services such as digital data 
collection/management and incorporating 
green practices/low impact development into 
our designs. 
Weston & Sampson brings extensive 
stormwater management experience with a 
multitude of diverse stormwater-related projects 
and backgrounds. We have decades of 
experience assisting communities, agencies, 
and private entities in meeting their stormwater 
needs.  
 
 
 

Page 551

Granby, CT | Professional Engineering Services 
 
 
Bidding & Construction Administration 
Weston & Sampson routinely assists through 
the bidding phase, and the subsequent 
construction phase, utilizing the core staff 
members who were involved with the project’s 
development and documentation. Our 
extensive experience with municipal projects 
allows our team to complete these tasks in 
compliance with Connecticut regulations and 
best practices. In situations that bring a higher 
level of complexity to the process (e.g., bid 
protests), we have dedicated construction 
management staff members who help guide 
decision-making and complete the process in a 
cost-effective manner.  
Weston & Sampson typically assists in the bid 
process by preparing electronic versions of 
construction documents that can be posted to 
one of the local print house “bid-house” 
websites for access by the contractor 
community; attending pre-bid meetings with 
potential contractors; reviewing bids from filed-
sub bidder(s) and making recommendations; 
reviewing bids from general contractors and 
providing recommendations regarding the 
successful, qualified low bidder; attending 
public information meetings; and providing any 
necessary follow-on construction services. 
Many projects are multi-faceted and require an 
interdisciplinary team to develop a strong 
design and limit change orders.  
During the construction phase, the Weston & 
Sampson team that prepares the construction 
documents provides the full range of standard 
A/E administration services (e.g., contractor 
submission review, responses to requests for 
information, responses to field conditions, 
responses to proposed modifications, review of 
requests for payment, periodic project 
meetings, and observation of the progress of 
the work).  
Weston & Sampson has been providing 
construction administration and resident 
inspection services for infrastructure 
construction throughout New England for more 
than a century. Our in-house Construction 
Services Department (CSD) offers superior 
services in construction management / 
administration and resident representation. Our 
CSD staff are experts in overseeing 
construction contractors, reviewing documents 
for constructability before bid, and negotiating 
 Project Highlight:   Springfield International Charter 
School Tennis & Pickleball Courts, Springfield, MA 

Page 552

Granby, CT | Professional Engineering Services 
 
 
change orders. CSD staff are available to 
provide consultation to the project team, and/or 
other support as appropriate. 
Weston & Sampson has provided resident 
representation services for many of our 
infrastructure design and construction projects 
across Connecticut and throughout New 
England. Responsibilities typically include 
review of shop drawings, contractor oversight, 
creation of daily and weekly reports and 
records of daily quantities, attendance at 
biweekly progress meetings, review of monthly 
pay estimates, field verification of pipeline 
elevations, client and community relations, and 
preparation of as-built record drawings, among 
other project-specific and as-needed tasks. Our 
extensive experience includes providing 
resident representation services for large, 
complex stormwater projects in densely 
congested urban areas, small office buildings, 
and parks of at least 1-acre in size within the 
last 10 years. 
Community Engagement 
Weston & Sampson brings decades of 
experience in public sector-focused community 
engagement, working extensively with public 
groups to report findings, gauge opinion, and 
build consensus. Our approach is rooted in 
clear, accessible communication, supported by 
a dedicated team of communications and 
graphics professionals. We prepare and 
present legible plans, photorealistic renderings, 
3D models, estimates, and other key materials 
to ensure complex technical and regulatory 
information is understandable for all audiences. 
Our commitment to meaningful engagement 
drives us to use a range of formats and tools 
designed to educate, engage, and entertain. 
We value public presentations that foster an 
affinity for both the presenters and the project, 
promoting collective buy-in and facilitating 
project progress. Additionally, we employ multi-
pronged, multimedia strategies that incorporate 
various platforms to reach diverse community 
members.  
To strengthen community ties and support 
long-term resilience, we prioritize empowering 
stakeholders, residents, and community 
organizations early in the process with the 
following methods.  
Intentional Event Composition 
• Ensuring representation reflects community 
demographics, neighborhoods, and 
knowledge 
Overcoming Barriers to Participation 
• Working respectfully with city/town 
representatives to address resource 
limitations and other constraints 
Community-Context Understanding 
• Using interactive techniques to gather 
stories, ideas, and feedback from a wide 
range of stakeholders 
Building on Local Knowledge 
• Avoiding “planning fatigue” by leveraging 
existing efforts and local expertise and 
encouraging ongoing community 
involvement. 
We strive to keep communities at the center of 
project planning, establishing an ongoing 
public dialogue to understand their needs and 
preferences. Our team develops concept plans 
tailored to community priorities, typically 
accompanied by budgets, phasing, funding, 
and implementation strategies. This 
comprehensive approach integrates social 
equity, climate resilience, and LID principles, 
transforming these goals into actionable 
elements. 

Page 553

Granby, CT | Professional Engineering Services 
 
 
Experience with State-Funded Projects 
& Federal Labor Standards/Davis 
Bacon 
Weston & Sampson has extensive experience 
with state and federally funded projects 
involving athletic fields in Connecticut. 
Additionally, as a public sector focused firm, we 
understand Section 106 Historic Preservation 
Act and BABA requirements and also have the 
experience to provide accurate cleanup costs, 
including Davis-Bacon wage rates 
Weston & Sampson has consistently remained 
at the forefront of obtaining available funding 
from federal, state, and local sources to expand 
the scope of projects for municipal clients. The 
firm assists with project funding and financing 
strategies, and grant/loan application 
preparation, including projects that involve a 
combination of funding sources.  
Our staff is accustomed to the specialized 
reporting requirements inherent with state and 
federally funded projects, as well as restrictions 
or limitations that may accompany specific 
funds. The firm maintains excellent working 
relationships with EPA, CT DEEP, FEMA, and 
other regulatory agencies.   
 
 
 Project Highlight:   LoPresti Park, Boston, MA 

Page 554

Granby, CT | Professional Engineering Services 
 
 
Water Engineering Expertise 
Weston & Sampson is a leader in 
drinking water system planning and 
improvement projects. Weston & 
Sampson has provided expert 
water system master planning, hydraulic 
modeling, and water facilities evaluation and 
planning services for hundreds of communities. 
Our team of professional engineers and 
operations specialists are experienced at 
evaluating supply, storage tanks, treatment, 
distribution, pumping needs, and existing water 
system facilities, as well as developing phased 
improvement programs and detailed cost 
estimates to assist communities with master 
planning efforts. 
Our range of services also includes water 
service installation and private well 
abandonment, which have been completed 
through both traditional design-bid-build 
methods and using our in-house construction 
services and well and pump department under 
design-build methods. 
 
 
 
Wastewater Engineering & Pump 
Stations 
Our experience in advanced wastewater 
treatment facility (WWTF) technologies for 
improved treatment includes secondary and 
tertiary treatment upgrades, nutrient removal, 
preliminary treatment, solids dewatering, 
disinfection, instrumentation and building 
support systems, and other aspects of facility 
modernization. Most importantly, we have the 
knowledge and experience necessary to 
evaluate facilities and advise clients on the 
adequacy of facility design, process, and 
technology.  
Our engineers have been providing evaluation, 
planning, design, construction administration, 
start-up, operation, maintenance, repair, and 
troubleshooting services for most of our 126-
year history. We have experience with 
wastewater treatment plants ranging in size 
from small (<10,000 gpd) commercial systems 
to larger 10 MGD+ municipal facilities. Our 
work on wastewater treatment facilities has 
included process alternative evaluations, 
BioWin treatment simulation development, 
changes and upgrades, modernization, 
efficiency improvements, and new processes, 
as well as building system renovations and 

Page 555

Granby, CT | Professional Engineering Services 
 
 
improvements, including septage receiving and 
solids handling facilities.  
Our experience in advanced WWTF 
technologies for improved treatment includes 
secondary and tertiary treatment upgrades, 
nutrient removal, preliminary treatment, solids 
dewatering, disinfection, instrumentation and 
building support systems, and other aspects of 
facility modernization. Most importantly, we 
have the knowledge and experience to evaluate 
facilities and advise clients on the adequacy of 
facility design, process, and technology.  
Additionally, our wastewater pumping 
experience includes a broad range of 
transmission and treatment-related wastewater 
pumping, including many applications with low-
head, high-head, flow-splitting, long force 
mains, dual force mains, and other unusual 
hydraulic conditions. Most of our pumping 
system projects include variable speed 
pumping schemes utilizing variable frequency 
drives (VFDs) and flow pacing control systems. 
 
  
Wastewater Collection System 
Weston & Sampson has assisted hundreds of 
municipal clients with the planning, design, and 
construction of their wastewater systems, 
including wastewater treatment facilities and 
collection/conveyance systems and pumping 
stations. We have provided evaluation, 
planning, design, construction administration, 
start-up, operation, maintenance, repair, and 
troubleshooting services all aspects of sewer 
engineering projects. 
The firm has a long history of providing 
engineering design and construction 
administration services for new, replacement 
and rehabilitated sewer pipelines. Weston & 
Sampson has designed approximately 300,000 
feet of force main sewer replacement piping for 
communities in Connecticut and 
Massachusetts within the past five years.  
Our recent contracts are diverse, including 
installations of 72-inch pre-stressed concrete 
cylinder pipe and rehabilitation of large 
diameter sewers and storm drains. Our urban 
community designs have included planning, 
design, bid assistance, and construction 
administration for bridge crossings over 
streams and interstate highways, directional 
drilling beneath lakes, rivers and wetlands, and 
pipe-jacking below active railroads. 
Additionally, our work has included process 
changes and upgrades, modernization and 
efficiency improvements, and new processes, 
as well as many building and associated 
system renovations and improvements.  
Our services related to wastewater collection 
systems include: 
• I/I & SSES programs 
• Innovative and alternative systems 
• Needs assessments and decentralized 
planning 
• Septage management 
• New sewer and septic systems 
 
Highlights of our relevant 
experience over the last 15 
years include: 
• Wastewater pumping projects at more 
than 200 sewage pump stations, 
including approximately 70 pump 
stations in the past five years 
• Wastewater treatment facility engineering 
projects, including evaluation and 
design, at more than 45 facilities in the 
New England region 
• Design and construction administration 
for approximately three million feet of new 
and reconstructed sewer pipelines and 
force mains 
• More than 170 construction contracts 
• Evaluation, planning, and conceptual 
design services on many other 
wastewater treatment process and 
pumping related projects 

Page 556

Granby, CT | Professional Engineering Services 
 
 
Affiliated Service Offerings 
Weston & Sampson’s affiliated companies 
include Connecticut-based specialists that offer 
the Town of Granby some very specialized and 
unique services under their assignments. These 
offerings include:  
• Weston & Sampson CMR, Inc. – providing 
construction, maintenance, and repair 
(“CMR”) of municipal infrastructure, 
specializing in mechanical, electrical, 
process, instrumentation, and equipment 
systems, such as pumping stations, water 
booster stations, and treatment facilities, our 
licensed construction and maintenance 
division offers our clients the unique ability to 
not only evaluate and design municipal 
infrastructure systems offered by our 
engineering division, but also the ability to 
construct, maintain, and repair the critical 
community systems that serve the utility 
interests of the municipality. 
o On-Call Repairs – CMR provides around 
the clock emergency repairs. We respond 
any time, including weekends or holidays. 
We diagnose, advise, and then perform 
the repair work on the spot. Our trucks 
are equipped with cranes, spare parts, 
and tools. CMR also provides testing, 
evaluation, and troubleshooting for 
numerous mechanical, electrical, 
hydraulic, and process problems. 
 
• Weston & Sampson Services, Inc. (WSS) – 
providing licensed water and wastewater 
operations services, our operations 
personnel support and supplement 
municipal staff in the day-to-day operation of 
critical water and wastewater systems. We 
offer certified and licensed staff that meet 
the CTDEEP requirements for Class 1 – 
Class 4 operations. WSS has operated 
multiple leachate collection and treatment 
systems at landfills throughout the Northeast 
and Pennsylvania and brings that 
knowledge base to this project.  
 
WSS offers many years of relevant 
experience, qualified personnel, expert 
management and support teams, and a 
wide variety of excellent services for different 
types of facilities including, but not limited 
to:  
o Landfill leachate treatment and pump 
stations 
o Wastewater treatment plants 
o Wastewater pump stations 
o Collection and distribution systems 
o Water treatment plants 
o Water pump stations and storage tanks 
o Remediation/recovery pump stations 
o Drainage pump stations 
 
• SB Church (a division of Weston & Sampson 
CMR) – for 130 years, SB Church has 
provided drinking water well construction 
and maintenance to the communities in and 
around Connecticut. Specializing in 
municipal scale drinking water well 
production, our team can provide highly 
specialized installation, maintenance, and 
repair of critical drinking water well and 
pumping systems. 
 

Page 557

Key Personnel 
 
Working with a team that is collaborative, 
responsive, and experienced is key to the 
success of engineering projects and 
assignments. As such, we offer the Town of 
Granby our project team of skilled engineers 
who provide high-quality services, 
demonstrated over the course of numerous 
projects for municipal clients throughout our 
region. 
On the following page, we have included our 
organizational chart that outlines the roles and 
responsibilities of our team members for the 
requested services outlined in the RFP. We 
have also included detailed resumes for these 
individuals, as well as other personnel 
designated for this project, at the end of this 
section.  
Capacity to Complete Services 
in Required Timeframe 
Weston & Sampson’s team is structured with 
consideration to provide depth of technical 
competence and the capacity to successfully 
meet the proposed project schedules and 
budgets. 
With more than 90 full-time technical staff, 
including landscape architects, in our Rocky 
Hill, Connecticut, office, supported as 
necessary by more than 1,000 technical 
professionals in our other East Coast offices, 
Weston & Sampson has the staff capacity to 
successfully complete the scope of work on 
time and within budget. In organizing and 
scheduling our staff for projects, we consider 
their commitments for other projects to ensure 
their availability to meet the proposed project 
schedule. During critical points, these 
personnel will devote up to 100% of their time, 
as needed, to deliver the project products and 
requirements on time and on budget. 
We have a demonstrated record of committing 
the resources necessary to meet important 
deadlines. Our firm’s depth-of-staff and breadth 
of expertise ensures the availability of highly 
qualified personnel to meet your project needs. 
Project Highlight:  Bartlem Park, Cheshire, CT 

Page 558

Granby, CT | Professional Engineering Services 
 
 
 

Page 559

Granby, CT | Professional Engineering Services 
 
 
Project Management 
Raju Vasamsetti, PE 
Raju, regional manager of 
Weston & Sampson’s 
Connecticut office, will serve the 
role of principal-in-charge. He is 
a Connecticut registered 
professional hydraulic engineer with over 20 
years of experience. He possesses specific 
expertise in the field of hydrology and 
hydraulics involving hydrology/ hydraulic 
modeling, drainage systems, bridge 
replacement/ rehabilitation, flood control, and 
stream restoration projects. His design 
experience also includes preparation of state, 
local, and federal permits; cost estimating and 
specifications; plan reviews; and coordinating 
design to meet construction requirements. In 
addition, he has experience working with 
several projects funded through LOTCIP, 
Federal Local and State Local Bridge 
Programs. 
Ryan Chmielewski, RLA, ASBA 
Ryan has more than 25 years of 
experience and is a team leader 
responsible for managing and 
executing projects from initial 
conception through project 
closeout with construction values ranging from 
$10,000 to $80 million. He offers vast 
experience working with Connecticut 
municipalities, athletics programs, and school 
systems on various project types, including 
Greenwich, North Haven, Norwalk, Cheshire, 
Storrs, and Thomaston on their athletic facility 
improvement efforts, among others. Ryan has 
previously successfully delivered on athletic 
and recreational complexes, running tracks, 
synthetic turf and natural grass fields, sports 
field lighting, and athlete and spectator 
amenities. He is accomplished in coordinating 
small- and large-scale multidisciplinary 
projects, including Meriden Green, and offers 
expertise in ADA accessibility, sustainable 
design, and athletic/recreational facility safety. 
Ryan is an active member in American Sports 
Builders Association (ASBA), presenting 
Planning for and Mitigating Noise Issues in 
Racquet Sports study at the National ASBA 
Technical Trade show.   
Technical Review 
Brandon Kunkel, RLA 
Brandon will serve as a 
technical reviewer of your 
project, and he will ensure your 
project remains a priority of the 
firm. Brandon has more than 25 
years of experience in innovative planning and 
design. His areas of expertise include 
sports/athletic field and court amenities, open 
space parks, trails, ADA and equitable design, 
renovation and rehabilitation, durable and 
extended lifecycle solutions, and academic 
campuses. Brandon’s relevant experience 
includes supporting multiple athletic and 
recreation field efforts as principal or project 
manager, including High School, Middle 
School, & Town Various Athletic Facility 
Improvements in North Haven as well as 
Athletic Field Improvements in Greenwich. He 
also served as project manager of the multi-
award-winning Langone Park and Puopolo 
Playground in Boston, working with the Boston 
Parks and Recreation Department to develop 
the conceptual design through construction for 
the complete refurbishment of this signature 
waterfront park in the North End. 
Joseph Perugini, PE 
Joe is a development/peer 
review specialist with 20+ years 
of experience. He has provided 
peer review services to 
municipalities for site 
development, traffic improvement, and 
stormwater management projects, such as for 
the Avon Village Center and as project manager 
for multiple peer review projects for the Town of 
Mansfield. Joe has extensive experience 

Page 560

Granby, CT | Professional Engineering Services 
 
 
dealing with local Inland Wetland and Planning 
and Zoning Commissions in obtaining various 
land use approvals, and he has also provided 
engineering services for site developments 
throughout the state. He has a robust 
background that has involved projects for storm 
sewer drainage and improvements, stormwater 
management systems, stormwater quality, 
erosion and sedimentation control measures, 
wetland impact mitigation, roadway design, 
and site engineering and design. 
Subconsultants  
In addition to the multi-disciplinary capabilities 
of Weston & Sampson, we are pleased to offer 
the as-needed subconsultant services of Denno 
Land Surveying and Davison Environmental, 
LLC, bringing discipline expertise and local 
knowledge to this project. 
Denno Land Surveying  
 
Organization Name:  
Denno Land Surveying 
2 Tunxis Road, Suite 214  
Tariffville, CT 06081 
 
Project Role: Surveying 
 
Denno Land Surveying is a full-service land 
surveying and civil engineering company 
located in Simsbury, Connecticut. Owner Brian 
Denno, LS, is a licensed Land Surveyor with a 
degree in Civil Engineering and more than 35 
years of experience in the industry. Denno’s 
experience includes multiple Farmland 
Preservation Surveys for the Connecticut 
Department of Agriculture, ELUR plans all over 
western Connecticut, and most recently 
construction layout for a multi-use development 
in Simsbury, Connecticut; as well as FEMA 
flood certificates in Farmington, Old Saybrook, 
and Suffield.  
Davison Environmental, LLC 
 
Organization Name:  
Davison Environmental, LLC 
10 Maple Street 
Chester, CT 06412 
 
Project Role: Soil Scientist 
Davison Environmental, LLC provides 
consulting services for biological, wetland, and 
soil sciences, environmental impact 
assessment and mitigation planning to public 
agencies and private clients, including utilities, 
attorneys, site developers, municipalities, and 
public interest groups. 
In addition to identification, description, and 
classification of natural resources, the firm also 
provides functional evaluation of wetlands and 
other biological systems, guidelines for 
mitigation of potential adverse impacts, and 
permit support through expert testimony and 
public representation. Services provided 
revolve around the impact of human activities 
on terrestrial, wetland, aquatic, and marine 
resources. The firm specializes in biological 
and wetland surveys, impact assessment, and 
mitigation planning. 
 Project Highlight:  Route 1A Athletic Fields Recreation Complex, Walpole, MA 

Page 561

westonandsampson.com
Master Flood, Climate Resilience Plan, Fairfield, 
Connecticut. Principal-in-charge for the development of a 
Master Flood and Erosion Resiliency Plan in conjunction with 
RACE Coastal Engineering that included assessing coastal, 
riverine, and pluvial flood risks, assessing alternatives, 
prioritizing resilience mitigation strategies for conceptual 
design and benefit-cost analysis for coastal flood risk, 
developing a toolbox of green infrastructure strategies for 
inland flooding, and building a storymap and data viewer 
to support future decision-making. A Master Flood and 
Resilience Plan will provide the town with a roadmap for 
mitigating inland and coastal flood and erosion impacts 
while maintaining the community’s natural coastal character. 
Clough Brook Watershed Drainage Study, Waterbury, 
Connecticut. Principal-in-charge for the evaluation of 
riverine flooding, storm drainage systems and neighborhood 
flooding issues for Clough Brook, which experiences 
recurring flooding issues. The project included hydrologic 
and hydraulic modeling, evaluation of the conveyance 
systems, public engagement, and development and 
prioritization of practical site-specific engineering solutions 
for conceptual design and cost estimates.
Reconstruction of Guernseytown Road, Watertown, 
Connecticut. Project manager involved with drainage 
design and hydraulic analysis for the design, modeling, 
and permitting for major drainage improvements, erosion 
control, and water quality measures on Guernseytown Road 
in Watertown. Used Hydraflow Storm Sewers to perform 
drainage analysis, which included providing new storm 
drainage systems and improving the existing infrastructure.
Key Project Experience
Raju Vasamsetti
PE
Regional Manager
26 Years of Experience | 11 Years with the Firm
Raju specializes in hydrologic/hydraulic analysis, design, 
and permitting for stormwater management, highway, bridge 
/ culvert replacement, flood control, and stream restoration 
projects. His experience ranges from preliminary project 
planning through final design to permitting and construction 
contract administration. An expert in helping clients achieve 
resiliency from inland/coastal flooding and shoreline 
destruction, Raju focuses his efforts on understanding and 
improving inland/coastal drainage and infrastructure for 
municipalities.
Title
Regional Manager
Office Location
Rocky Hill, CT
Education
2003, Master of Science
 Civil & Environmental Engineering
     South Dakota School of Mines 
& Technology
1999, Bachelor of Engineering
Civil Engineering
Osmania University
Registrations/Certifications
Professional Engineer:
CT No. PEN.0025720
NC No. 050292
OSHA 10-Hour Construction 
Training
CTDOT-Approved Hydraulic 
Engineer

Page 562

westonandsampson.com
Harbor Brook Flood Control, Meriden, 
Connecticut. Water resources engineer for hydrologic 
and hydraulic analysis of Harbor Brook and its 
watershed. Performed hydrologic/hydraulic modeling 
and design for upstream storage improvements, 
channel improvements and bridge replacement design 
using HEC-RAS and HEC-HMS.
Pequabuck River Culvert Inspection and 
Hydraulic Analysis, Bristol, Connecticut. 
Performed a hydraulic analysis to assess the effects of 
sediment deposits in twin culverts through downtown 
Bristol during Hurricane Irene flood conditions. 
Completed a hydraulic analysis to propose the 
cleanout of sediment deposits through the culverts 
and raise the headwall/floodwall to alleviate flooding 
during hurricanes like Irene. Conducted scour analysis 
to evaluate the extent of scour hole on a severely 
damaged channel bank wall and proposed scour 
resistant design to repair the headwall. Recommended 
potential permits required by local, state and federal 
agencies for the proposed design.
Bradley, Coe and Center Street Bridge 
Replacements Design, Meriden, Connecticut. 
Senior hydraulic engineer for the hydraulics, scour, 
drainage and permitting for the replacement of Bradley, 
Coe and Center Street bridges designed in compliance 
with CTDOT Local Bridge Program.
Chatham Drive and Cossitt Road Storm Drainage 
Improvements, Norwalk, Connecticut. Team leader 
for the Development of design plans, cost estimate 
and specifications for storm sewer improvements to 
a neighborhood. Reviewed the storm sewer design, 
which was modeled in AutoCAD Hydraflow Storm 
Sewers. Also reviewed the outfall protection and water 
quality design, which were designed in accordance 
with CTDOT Drainage Manual. Assisted with 
construction admin services including responding to 
RFIs and developing change orders.
Toilsome Brook Resilience Plan, Stamford, 
Connecticut. Principal-in-charge for the evaluation of 
riverine flooding and flood mitigation solutions through 
extensive community engagement, hydrologic and 
hydraulic modeling, development of evaluation criteria, 
evaluation of watershed to site specific scale mitigation 
strategies, benefit-cost analysis, and conceptual 
design and cost estimates for prioritized strategies. A 
final comprehensive plan provided conceptual designs 
and narratives in support of grant funding.
South End Drainage Study, Stratford, 
Connecticut. Team leader for the Drainage Study for 
the South End neighborhood of Stratford, CT, which 
contains 1,022 acres. The study involved modeling 
the hydraulics of existing South End conditions and 
proposed improvements with the program PCSWMM.  
The study included preparing opinion of probable 
construction cost and potential permits for each 
improvement. 
Oronoque Village Drainage Study, Stratford, 
Connecticut. Project manager for the Drainage 
Study for the Oronoque Village, which contains a 
golf course and condominium community spanning 
300 acres. Modeled existing drainage and proposed 
improvements with HydroCAD. The study included 
preparing opinion of probable construction cost and 
potential permits for each improvement.
Crescent Lake Area Roadway and Drainage 
Improvements, Enfield, Connecticut. Project 
manager involved with drainage design for the design, 
modeling, and permitting for replacement of 11,000 feet 
of roadway including major drainage improvements, 
erosion control, and water quality measures around 
Crescent Lake area. Used Hydraflow Storm Sewers to 
perform drainage analysis, which included providing 
new storm drainage systems and improving the 
existing infrastructure.
LOTCIP Program, Various Locations, Connecticut. 
Project manager involved with hydraulic modeling, 
bridge replacement, scour analysis, and drainage 
design for projects funded through LOTCIP program in 
the towns of Greenwich, New Milford, Thomaston and 
Watertown.
Bruce Brook Hydraulic and Drainage 
Improvements, Barnum Avenue, Stratford, 
Connecticut. Project manager for field inspections, 
hydraulic analysis, design, permitting and construction 
inspection of 1,500 feet of Bruce Brook. Channel 
improvements include drainage widening/ relocating 
the channel and drainage outfall relocation on West 
Street. Submitted a FEMA CLOMR currently in review 
with FEMA.
Freeman Brook Drainage Improvements, 
Oronoque Village, Stratford, Connecticut. Project 
manager for design revisions and construction 
administration of Freeman Brook Drainage 
Improvements in Stratford’s Oronoque Village.
Raju Vasamsetti's Key Project Experience Cont.

Page 563

westonandsampson.com
Various Athletic Facility Improvements, North Haven, 
Connecticut. Team Leader for the feasibility of and bid 
documents for athletic field improvements to DeMayo 
Baseball and Brozek Softball fields. Determined through 
an initial feasibility study, the fields committee desired to 
relocate the 90-foot baseball diamond to accommodate 
greater separation from neighboring property owners and 
to accommodate future grandstands for 350 spectators. 
The infield was experiencing a multitude of drainage 
problems that caused significant delays, cancellations, 
and postponement of games. Ryan led his team of sports 
field specialists in the evaluation of the existing rootzone, 
subsoils, and surface and subsurface drainage to determine 
an appropriate solution. Based on the findings of the 
rootzone being highly susceptible to compaction due to 
high levels of silt, fine sands, and very fine sands coupled 
with a very well drained subsurface, the rootzone was 
amended to reduce susceptibility to compaction. Due 
to the relocation of the infield by 60 feet and preliminary 
investigations, recommended field improvements included: 
strip, screen, stockpile and amend rootzone on site, 
establish subgrade, control compaction during construction, 
install new irrigation, install amended rootzone, and sod.  
Additional improvements included new LED sports lighting, 
new backstops, bullpens, perimeter fencing, and pre-cast 
concrete dugouts. Bids came in under budget at $2.391M 
that was established during the feasibility stage.  Provided 
support to team during construction administration services 
through final completion of the project.
Springfield International Charter School Tennis Courts 
Key Project Experience
Ryan Chmielewski
RLA, ASBA
Landscape Architecture
26 Years of Experience | 7 Years with the Firm
Ryan is responsible for managing and executing projects 
from initial conception through project closeout with 
construction values ranging from $10,000 to $20 million. 
He has vast experience with a variety of project types, 
including educational site development, civic/ institutional 
development, parks, athletic and recreational facilities, 
greenways/bikeways/multi-use trails, brownfields 
redevelopment, mixed-use development, retail, large-scale 
residential housing, and municipal streetscapes. He offers 
expertise in ADA accessibility, sustainable design, and 
playground safety.
Title
Team Leader
Office Location
Rocky Hill, CT
Education
1999, Bachelor of Landscape 
Architecture 
University of Rhode Island
Registrations/Certifications
Registered Landscape Architect: 
CT No. LAR.0001048
Level 1 Slab-on-Ground 
Installation Post-Tensioning 
Institute Certification: ID No. 
02207688

Page 564

westonandsampson.com
Design Documents, Springfield Massachusetts. 
Team leader who led staff through feasibility studies, 
design, permitting, contract document preparation, 
and construction administration for five post-tension 
concrete tennis/pickleball courts. Responsibilities 
included client coordination, project management, 
and providing QA/QC throughout the process, along 
with collaborating with civil, geotechnical, structural, 
electrical, and mechanical engineers for associated 
work with the tennis courts to review constructability. 
Insured courts were designed according to the 
American Sports Builders Association (ASBA), United 
States Tennis Association (USTA), and USA Pickleball 
standards and recommendations. The fencing for the 
courts was designed to accommodate windscreens. 
Bids came in on budget at $3 million.
Rockwell Park Master Plan, Bloomfield, 
Connecticut. Served as team leader for the park 
master planning process. Coordinated with the Director 
of Parks, Recreation, & Leisure Services to successfully 
plan and execute the various stages of the project. 
Guided our team of landscape architects, engineers, 
and sub consultants to bring the project within the 
budget and according to community expectations. 
Continued pro bono work to assist the town in the grant 
application process by providing updated construction 
costs, project description summary, and allocations of 
funds towards required grant categories.
Athletic Fields Feasibility Study, Lexington, 
Massachusetts. Senior project manager for a town-
wide master plan to evaluate the use and condition 
of 40 fields at 20 sites and make field improvement 
recommendations that meet town and field user 
expectations. Currently leading his team of sports field 
and recreation specialists through the study consisting 
of visual observations, data collection, stakeholder 
engagement, evaluation of almost 25,000 hours of use, 
and coordination between Recreation & Community 
Programs, Department of Public Works, Lexington 
Public Schools, and sports field stakeholder groups.
Eastern Greenwich Civic Center Pickleball 
Courts, Greenwich, Connecticut. Team leader 
responsible for leading staff and sub-disciplines 
through a feasibility study, design, permitting, and 
contract documents for a post-tension concrete slab 
that accommodates four recreation-level pickleball 
courts. Provided design oversight throughout 
the process and worked with the design team to 
determine the appropriate cross-sections based 
on test pit results. Portland Recreational Complex, 
Portland, Connecticut. Senior project manager 
responsible for construction administration of a 
new park. The park includes two baseball and two 
soccer high performance sand based rootzone 
mix fields, splash pad with water repurpose system 
for irrigation, children’s playground, outdoor adult 
fitness area, bocce courts, future basketball courts, 
vehicular circulation and parking, roadway realignment 
intersecting a state road, pedestrian walking trails, and 
a restroom pavilion with a full kitchen.
Chapman Park Feasibility Study, Cheshire, 
Connecticut. Senior project manager responsible 
for determining the appropriate use for a recently 
purchased 10-acre parcel of land adjacent to Bartlem 
Park. Led team of parks and recreation specialists 
through the master planning process including data 
collection, inventory and analysis, public engagement, 
stakeholder involvement, design charettes, survey 
monkey, athletic field use study, and the development 
of conceptual plans and associated costs for design, 
permitting, and construction. 
Athletic Field Improvements at the Springfield 
International Charter School (formerly SABIS), 
Springfield, Massachusetts. Senior project manager 
for the feasibility of and bid documents for athletic 
field improvements to a baseball and softball field with 
soccer field overlay and a dedicated grass soccer 
field. The school was experiencing poor drainage, 
compacted soils, and a multitude of drainage 
problems that caused significant delays, cancellations, 
and postponement of practices and games. During the 
feasibility study, led his team of sports field specialists 
in the evaluation of the existing rootzone, subsoils, 
and surface and subsurface drainage to determine 
an appropriate solution based on client expectations. 
Several options were presented to the school, ranging 
from renovation to complete field reconstruction, as 
well as the installation of synthetic turf, with costs 
ranging from $400K to $5M. With his project team, 
coordinated permitting and prepared bid documents 
for bidding for replacement of the existing fields with a 
high performing sand based rootzone mix. Bids came 
in under the $2.2M budget that was established during 
the feasibility stage.
Ryan Chmielewski's Key Project Experience Cont.

Page 565

westonandsampson.com
Athletic Complex Renovations at Wayland High 
School, Wayland, Massachusetts. Project manager and 
team leader for the comprehensive design, engineering, 
and construction administration services as part of the 
renovation of the existing athletic complex at Wayland High 
School. Improvements included new courts, outdoor track 
and synthetic turf field; a new turf field; new restroom, 
concession, and ticket sales buildings; replacement of 
the bleachers and press box; a new softball field; updated 
sports field lighting; and associated parking improvements.
Claxton Field Renovation, Needham, Massachusetts. 
Principal-in-charge for the renovation of two (2) existing 
softball fields as well as a parking lot, installation of new 
plantings, and incorporation of walking trails and stormwater 
drainage/management. Project also involved interim grading 
for future pickleball courts.
Cricket Field Renovation, Needham, Massachusetts. 
Principal-in-charge for the evaluation of playing fields for 
school and community sports leagues. Developed plans, 
details, and specifications for improvements including 
stripping of the turf cover, slight regrading of the entire 
subsurface footprint to correct inconsistencies, amended 
soils, and a new irrigation system.
Key Project Experience
Brandon Kunkel
RLA
Landscape Architecture
24 Years of Experience | 11 Years with the Firm
Brandon specializes in innovative design and master 
planning, with expertise in athletic field and court complexes, 
urban parks, academic and corporate campuses, and 
natural resource conservation and rehabilitation. He 
manages land use development projects, addressing 
complex environmental, sustainability, and historic 
preservation issues. Brandon regularly collaborates with 
public officials, state agencies, and external consultants.
Title
Discipline Leader
Office Location
Boston, MA
Education
2001, Bachelor of Landscape 
Architecture 
University of Rhode Island
Registrations/Certifications
Registered Landscape Architect:
CT No. LAR.0001609
ME No. LAR5342
MA No. 4040
RI No. LA.0000735

Page 566

westonandsampson.com
Conway Park Redevelopment, Somerville, 
Massachusetts. Project manager responsible 
for leading this athletic field and playground/plaza 
improvements effort that involved converting this 
contaminated/brownfield site into a healthy public park, 
with a splash/spray pad, playground, plaza/gathering 
areas, and multiuse synthetic turf field that was 
incorporated into the soil cap design.
Route 1A Athletic Field Complex, Walpole, 
Massachusetts. Project manager responsible for the 
planning, final design, and construction services for 
this 30-acre, multi-sport and recreation complex. The 
new facility includes two full-size multi-sport synthetic 
turf fields; two full-size natural turf soccer fields, 
overlayed with full-size baseball and softball fields; two 
basketball courts; a universally accessible playground; 
a support building; walking paths; parking; and 
supporting infrastructure.
Community Field Complex, Portsmouth, New 
Hampshire. Provided landscape architecture and 
construction administration support for athletic fields 
master plan design and the first phase design and 
implementation under a multi-phased program. The 
associated site improvements of the first phase of the 
project included the design and construction of a new 
synthetic turf multiuse field, sports lighting, parking, 
pedestrian access, drainage, plantings, and other 
athletic field support amenities.
Improvements to LoPresti Park, East Boston, 
Massachusetts. Provided design, permitting, and 
construction administration work for this Boston Parks 
and Recreation Department waterfront park project, 
which involved construction of a state-of-the-art 
synthetic turf field (funded in large part by the United 
States Soccer Association), realigning pedestrian 
connections, rotating fields for game play and practice 
to allow for a more efficient use of the site, positioning 
the most-used elements of play for improved park 
safety and access, and climate-resilient design 
considerations. The final design includes granite sea 
wall blocks installed in a staggered pattern to diffuse 
wave action during extreme high tide conditions.
Open Space and Recreation Plan Update, 
Seekonk, Massachusetts. Responsible for the 
development of a town-wide open space and 
recreation plan aimed at delivering higher performing 
sports and recreation facilities to residents.
Comprehensive Athletic Field & Court Utilization 
Study, Wellesley, Massachusetts. Responsible 
for the assessment and development of a town-wide 
feasibility study to examine existing field and court 
facilities; completion of a needs assessment of various 
user groups and the public; identification of the extent 
to which these needs are unmet/met; and design a 
strategy to close the gaps by adjusting the quantity, 
quality, or design of facilities that are charged with 
meeting those resident needs and expectations. This 
effort involved 42 fields and 36 courts at 16 sites.
Redevelopment of Riverfront Park, Springfield, 
Massachusetts. Landscape architect for the 
development of renovation/restoration strategies 
as part of a master plan for this riverfront property, 
including park upgrades and infrastructure 
improvements. Park redevelopment included universal 
accessibility; site/pedestrian access and connectivity; 
horticultural and landscaping; an interactive water 
feature; and improvements to signage, performance 
spaces, lighting, and utility connections.
Renovations to McConnell Park, Boston, 
Massachusetts. Landscape architect working 
on renovations to this Boston Parks & Recreation 
Department open space resource in the Savin Hill 
neighborhood of Dorchester. Park improvements 
include renovations to an existing ballpark including a 
synthetic turf Challenger Field and two natural grass 
ball fields. The site was within a 100-year flood plain 
and was being utilized for coastal resilience. The site 
entailed complex grading, drainage, and site layout to 
meet the goals of the city.
Langone Park and Puopolo Playground, 
Boston Parks and Recreation (BPRD), Boston, 
Massachusetts. Project manager responsible for 
working with the BPRD to develop final designs, obtain 
permits, and provide construction administration for 
the complete refurbishment of this signature waterfront 
park in Boston’s historic North End. Design efforts 
included lighting, benches, interpretive signage 
conveying the unique historical and environmental 
heritage of this site, and climate/coastal resilient 
strategies. This multi-award-winning park/open space 
project is the first in the city designed with climate-
resilient features embedded throughout to protect the 
park’s shoreline, the neighborhood, and other public 
assets from projected sea level rise and an increase in 
storm events.
Brandon Kunkel's Key Project Experience Cont.

Page 567

westonandsampson.com
On-Call Peer Review Services, Mansfield, Connecticut. 
Project manager responsible for the management of several 
multi-discipline (traffic, landscape, affordable housing, 
architecture) peer reviews for the Town of Mansfield Planning 
and Zoning Commission:
• The Villas at Four Corners - Multi-Family Residential 
Housing
•  The Standard at Four Corners - Multi-Family Residential 
Housing
•  106 Storrs Road Redevelopment - Mixed Use 
Development
•  497 Middle Turnpike - Multi-Family Residential Housing
•  Villages at Four Corners - Multi-Family Residential 
Housing
•  HUB at Mansfield - Mixed Use Development
Tasks include the review of Statement of Use document, 
site/landscape/architectural plans and details, traffic study, 
and affordable housing. Multiple rounds and Peer Review 
Reports were prepared, and representation was provided at 
local commission meetings.
North Haven Various Athletic Track and Field, North 
Haven, Connecticut. Project manager responsible for 
the site/civil engineering, water service design, stormwater 
management and low-impact development (LID) design, 
local zoning/permitting, and construction administration 
services.
Key Project Experience
Joseph Perugini
PE
Wastewater
31 Years of Experience | 18 Years with the Firm
Joe has expertise in a variety of civil engineering projects 
involving stormwater management, low-impact development 
(LID) design, erosion and sedimentation control 
measures, wetland impact mitigation, roadway design 
and realignments, site engineering and design, residential 
septic system design, preparation of construction plans and 
documents, and the development of detailed Opinion of 
Probable Construction Cost (OPCC) estimates. Joe is also 
experienced in coordinating with local commissions to obtain 
land use approvals and in performing engineering peer 
reviews.
Title
Technical Leader
Office Location
Rocky Hill, CT
Education
1994, Bachelor of Science 
Civil Engineering 
University of Connecticut
Registrations/Certifications
Professional Engineer: 
CT No. PEN.0024027 
MA No. 54381

Page 568

westonandsampson.com
Page Park Phase 1, Bristol, Connecticut. Project 
manager responsible for the site/civil engineering, 
phased erosion control plans, water/sanitary system 
designs, local zoning/permitting, state permitting 
(OSTA), stormwater management and low-impact 
development (LID) design, and construction 
administration services.
Bible Street Park & Havemeyer Field 
Improvements, Greenwich, Connecticut. Project 
manager responsible for the site/civil engineering, 
stormwater management and low-impact development 
(LID) design, local zoning/permitting, and construction 
administration services.
Springfield International Charter School (SICS) 
Post-Tensioned Concrete Tennis and Pickleball 
Courts, Springfield, Massachusetts.  Project 
manager responsible for the site/civil engineering, 
water service design, stormwater management and 
low-impact development (LID) design, local zoning/
permitting, and construction administration services.
North Haven Vanacore Track & Field, North 
Haven, Connecticut. Project manager responsible 
for the site/civil engineering, water service design, 
stormwater management and low-impact development 
(LID) design, local zoning/permitting, and construction 
administration services.
Bloomfield Rockwell Park Master Plan, 
Bloomfield, Connecticut. Project manager 
responsible for the site/civil engineering, utility 
coordination, stormwater management and low-impact 
development (LID) design considerations associated 
with the master planning process.
Engineering Services for Pond Dredging at 
Buena Vista Pond, Beachland Park Pond and 
Wolcott Pond, West Hartford, Connecticut. 
Project manager responsible for the watershed 
analysis and determination of sediment load for 
three municipal ponds and evaluation of options and 
recommendations for sediment removal (structural and/
or forebays). Other responsibilities included preparation 
of a summary report to include sediment removal 
recommendations, permitting evaluation, conceptual 
design figures of project area, opinion of probable 
construction costs, and approximate schedule. The 
report will be utilized by the town to seek bids for the 
development of construction documents. 
McMackin Field Design, Revere, Massachusetts.  
Project manager responsible for the site/civil 
engineering, subsurface stormwater management 
and low-impact development (LID) design, erosion 
& sedimentation control measures, utility design, bid 
documents, and construction administration services.
Byram Park Pool and Recreation Area, 
Greenwich, Connecticut. Project manager 
responsible for the site civil engineering, parking layout, 
building and landscape architecture, structural design, 
electrical design, pools/splash pad/pump and filter 
building design, low-pressure sanitary system design, 
local zoning/permitting, and stormwater management 
and low-impact development (LID) design.
Cheshire Bartlem Park South – Phase 1, Cheshire, 
Connecticut. Project manager responsible for the site/
civil engineering, phased erosion control plans, water/
sanitary system designs, local zoning/permitting, state 
permitting (OSTA), stormwater management and low-
impact development (LID) design, and construction 
administration services.
Portland Recreational Complex, Portland, 
Connecticut. Project manager responsible for the 
design of multiple athletic fields, parking layout, 
building and landscape archi¬tecture, pools/splash 
pad/pump and filter building design, traffic design, 
subsurface sewage disposal system design, and local 
wetland permitting. 
Pear Tree Point Beach Park improvements, 
Darien, Connecticut. Project manager responsible 
for the site civil engineering, parking layout, landscape 
architecture, dewatering/dredging/erosion and 
sedimentation controls, hydrologic modeling, and 
stormwater quality design.  Other responsibilities 
include local and state permitting support.
Merwin Meadows Park Pond Dredging and 
Beach Restoration, Wilton, Connecticut. Project 
manager responsible for the design of the pond 
dredging and erosion and sedimentation control 
measures, and coordination of local, state, and federal 
permitting.  Other responsibilities include development 
of construction documents, bidding support, and 
construction administration services. 
Joseph Perugini's Key Project Experience Cont.

Page 569

westonandsampson.com
Vanacore Track Replacement at North Haven Middle 
School, North Haven, Connecticut. Assisted the team 
in preparing preliminary design through construction 
documentation and cost estimates at each project phase 
and provided construction oversight and administration 
services. With minor adjustments to the track layout, added 2 
lanes to the straightaway for a total of 8 lanes. Improvements 
included a new track surface, long jump and triple jump 
lanes and pits, pole vault and high jump areas, fencing, 
sports field lighting, scoreboard, and concession and locker 
room access. The track was previously constructed with a 
1.5-foot elevation change, which required significant grading 
and drainage to meet current standards.
Various Athletic Field Improvements, North Haven, 
Connecticut. Landscape architect for the development of 
a $7M master plan for the North Haven Athletic Complex. 
Responsible for facilitating meetings with the town, 
developing master plan documents, and spearheading 
the development of bid documents and cost estimates. 
The master plan incorporates key elements requested 
by the town that will improve a variety of athletic fields. 
Improvements include locating future grandstands at 
both baseball and softball fields, baseball/softball field 
renovations, a new concessions building, a new 1,000 seat 
grandstand at the turf field, and tennis court renovations. 
With funding for Phase 1, Weston & Sampson prepared 
construction documents that addressed $3.5M in 
improvements.
Key Project Experience
Jonathan Tunsky
RLA, CPSI
Landscape Architecture
19 Years of Experience | 4 Years with the Firm
Jon manages, designs, and details complex landscape 
architecture and site design projects. He brings extensive 
technical experience across diverse project types, 
including athletic fields, golf courses, parks, playgrounds, 
streetscapes, multiuse trails, educational campuses, housing 
developments, and peer reviews of landscape architecture 
and site development.
Title
Senior Project Manager
Office Location
Rocky Hill, CT
Education
2006, Bachelor of Landscape 
Architecture 
SUNY College of Environmental 
Science and Forestry
Registrations/Certifications
Registered Landscape Architect:
CT No. LAR.0001172   
   
Certified Playground Safety 
Inspector: No. 45349-0522

Page 570

westonandsampson.com
Athletic Fields Feasibility Study, Lexington, 
Massachusetts. Landscape architect for the 
completion of a town-wide athletic field feasibility study 
and development of an Action Plan that identifies 
prioritized improvements and summarizes all study 
findings. Efforts include an inventory and analysis of 
all existing fields, courts, and ancillary facilities and 
amenities; a needs assessment process to identify 
and prioritize community needs for fields, courts, 
and related recreational elements; capacity analysis 
based on existing and future demand for facilities; 
development of a plan for upgrading facilities and/or 
building new facilities as necessary; and outline of a 
potential implementation process including funding 
and phasing strategies for a 10-15 year period.
Athletic Field Improvements, Greenwich, 
Connecticut. Landscape architect for a 
comprehensive inventory and analysis of the existing 
conditions of the community’s athletic fields and 
development of a series of recommendations for 
improvements to accommodate current and future 
demands that allows for the proper maintenance to 
achieve the maximum level of field playability and 
protection of any new investments. Project efforts 
include a Capital Improvement Plan for redevelopment 
of athletic facilities; plans, visuals, maps, analyses, 
spreadsheets, and forms; existing conditions analysis; 
materials and equipment storage/maintenance plan; 
demand analysis and phasing plan; public input; 
conceptual plan development and recommendations; 
and revenue generating potential.
Bartlem Park Phase I Designs, Cheshire, 
Connecticut. Landscape architect responsible 
for providing technical support to complete Bid 
Documents for Phase 1 of this phased $14,870,000 
master plan to renovate and enhance Bartlem Park. 
The master plan outlines a range of active and passive 
recreational improvements, including a Great Lawn, 
Town Green, paved walkways, nature trails, multi-
purpose sports field, and parking. Phase 1 designs 
consist of the Great Lawn with a bandshell, paved 
walkways, multi-purpose sports field, and some 
additional parking.
Rockwell Park Planning, Bloomfield, Connecticut. 
Landscape architect responsible for providing the 
necessary documents and graphics and attending 
all meetings and outreach events for this master plan 
to renovate and enhance Rockwell Park. The existing 
park was underutilized and did not meet the current 
recreation needs of the town. Project efforts included a 
needs assessment, focus group meetings, community 
outreach and public participation, three layout options 
for review, and a final master plan. The master plan 
includes a large multi-use rectangular synthetic turf 
field with lighting (including a 90’ diamond baseball 
field and a 60’ diamond little league field), pickleball 
and basketball courts, a restroom building, pavilions, 
picnic areas, a playground, community gardens, a 
multi-use path, exercise stations, lighting, and parking. 
Implementation of Page Park Improvements, 
Bristol, Connecticut. Working with the team to 
prepare graphics, renderings, grading plans, and cost 
estimates as part of the firm’s efforts to prepare permit 
and construction documents for the implementation 
of the Page Park Master Plan. Also responsible for 
attending all meetings with the client and the parks 
committee.  Project efforts included assessing 
the master plan, providing recommendations for 
enhancing the area of the park around the pond, 
updating the master plan with additional city-requested 
programming/elements, and considering the city’s 
priorities and budget. 
Harbor Loop SoNo Wharf, Norwalk 
Redevelopment Authority. Provided landscape 
architecture support for the preparation of concepts, 
presentations and webinar surveys, preliminary 
documents, and cost estimates and attended all 
meetings with the client, stakeholders, and the public 
as part of the initial through preliminary design of three 
properties critical to the completion of the Norwalk 
River Valley Trail loop. Project efforts included analyzing 
the existing conditions; facilitating stakeholder 
interviews, focus group meetings, and two public 
meetings; and engaging CTDEEP at a preliminary 
application meeting to review concepts and determine 
permit requirements. The property called the Wharf 
was reimagined into a public space to serve the 
downtown, Maritime Aquarium, Sheffield Island Ferry, 
and visitors looking to explore the Norwalk River. 
Putnam to Thompson Air Line Trail Gap 
Connection Project, Putnam, Connecticut. 
Assisted with preparing options for possible routes 
to connect the 1.8-mile gap between the Town of 
Putnam’s River Trail and the State of Connecticut’s Air 
Line State Park Trail in Thompson. Prepared an option 
locating roundabouts at three intersections to allow for 
continuous traffic flow and reduced interruptions along 
the trail.
Jonathan Tunsky's Key Project Experience Cont.

Page 571

westonandsampson.com
Springfield International Charter School Tennis Courts 
Design Documents, Springfield, Massachusetts. Served 
as the landscape project architect for the development 
of five post-tension concrete tennis/pickleball courts, 
managing all phases from feasibility studies through 
design, permitting, contract document preparation, and 
construction administration. Responsibilities included direct 
client coordination, project management, and rigorous 
QA/QC oversight. Facilitated seamless collaboration with 
civil, geotechnical, structural, electrical, and mechanical 
engineers to ensure constructability and integration of all 
associated work. Ensured compliance with standards and 
recommendations set by the American Sports Builders 
Association (ASBA), United States Tennis Association 
(USTA), and USA Pickleball. Delivered the project on budget, 
with bids totaling $3 million.
SICS Athletic Field Improvements, Springfield, 
Massachusetts. Landscape architect responsible for 
assisting with the preparation of construction documents 
and production efforts for athletic field improvements at 
Springfield International Charter School. The project included 
upgrades to a baseball and softball field with a soccer 
overlay, as well as the development of a dedicated grass 
soccer field.
Various Athletic Field Improvements, North Haven, 
Connecticut. Served as project landscape architect for 
the $7,000,000 North Haven Athletic Complex master plan, 
contributing from project inception through the development 
of comprehensive master plan documents. Facilitated 
meetings with town officials and led the creation of detailed 
Key Project Experience
Evan Andrikos
RLA
Landscape Architecture
15 Years of Experience | 12 Years with the Firm
As part of the Sports & Recreation Group in the firm’s 
landscape design program, Evan is knowledgeable in 
landscape architecture design and construction, community 
/ environmental planning, community design, and plant 
identification. He is proficient in AutoCAD, Civil 3D, GIS, 
Adobe Photoshop, Google SketchUp, and related design 
programs.
Title
Project Manager I
Office Location
Worcester, MA
Education
2010, Bachelor of Architecture 
Landscape Architecture 
University of Rhode Island
Registrations/Certifications
Registered Landscape Architect: 
RI No. 780 
Level 1 Slab-on-Ground 
Installation Post-Tensioning 
Institute, Certification ID No. 
02207672

Page 572

westonandsampson.com
bid documents and cost estimates. The master plan 
focused on strategic athletic field enhancements, 
including future grandstands at baseball and softball 
fields, renovations to existing baseball/softball 
fields, construction of a new concessions building, 
installation of a 1,000-seat grandstand at the turf field, 
and renovations to the tennis courts. With Phase 1 
funding secured, led the preparation of construction 
documents addressing $3,500,000 in priority 
improvements outlined in the master plan.
Bartlem Park Phase I Designs, Cheshire, 
Connecticut. Provided technical support for the 
completion of Bid Documents for Phase 1 of the 
$14,870,000 master plan, aimed at revitalizing and 
enhancing the park with diverse active and passive 
recreational elements. Contributed to the development 
of key components, including the Great Lawn, Town 
Green, paved walkways, nature trails, a multi-purpose 
sports field, and expanded parking. Ensured the 
accuracy and completeness of Bid Documents to 
support the successful implementation of the project.
Implementation of Page Park Improvements, 
Bristol, Connecticut. Served as the project 
landscape architect, working closely with the team 
to develop key deliverables, including graphics, 
renderings, detailed grading plans, and comprehensive 
cost estimates essential for permit and construction 
document preparation. Conducted a thorough 
assessment of the existing master plan, providing 
strategic recommendations for enhancing the pond 
area and incorporating additional city-requested 
programming and elements into the updated plan. 
Ensured alignment with the city’s priorities and 
budgetary constraints, resulting in a feasible and 
impactful final design.
Rockwell Park Planning, Bloomfield, Connecticut. 
Served as the project landscape architect for the 
Rockwell Park renovation master plan, leading the 
creation of essential documentation and visual 
materials to ensure seamless project communication. 
Actively participated in client meetings and public 
outreach events, facilitating productive dialogue and 
gathering crucial stakeholder feedback. Conducted a 
thorough needs assessment, organized targeted focus 
group meetings, and implemented comprehensive 
community outreach strategies to maximize public 
participation. This collaborative process resulted in 
three distinct layout options, each rigorously reviewed 
and refined. The final master plan included a large, 
illuminated multi-use synthetic turf field adaptable for 
both 90’ and 60’ diamond baseball, pickleball, and 
basketball courts, a new restroom facility, shaded 
pavilions and picnic areas, a modern playground, 
community garden plots, an accessible multi-use path 
with exercise stations, updated lighting, and expanded 
parking. Ensured the final master plan reflected the 
community’s vision and addressed the identified 
recreational deficiencies.
Athletic Field Improvements, Greenwich, 
Connecticut. Landscape designer in support of a 
comprehensive inventory and analysis of the existing 
conditions of the community’s athletic fields and 
development of a series of recommendations for 
improvements to accommodate current and future 
demands that allows for the proper maintenance to 
achieve the maximum level of field playability and 
protection of any new investments. Project efforts 
include a Capital Improvement Plan for redevelopment 
of athletic facilities; plans, visuals, maps, analyses, 
spreadsheets, and forms; existing conditions analysis; 
materials and equipment storage/maintenance plan; 
demand analysis and phasing plan; public input; 
conceptual plan development and recommendations; 
and revenue generating potential.
Courts Assessment and Capital Planning, 
Greenwich, Connecticut. Landscape designer for 
the evaluation of tennis courts and basketball courts at 
seven locations throughout the town. Efforts included 
documenting the current condition and conducting 
on-site investigations of the courts, including a 
visual assessment, applicable measurements, 
and relevant data collection. The project includes 
providing recommendations and preliminary costs for 
improvements to the courts, a cost benefit analysis 
between post-tension concrete courts and bituminous 
courts, and a replacement timeline.
Athletic Fields & Courts Feasibility Study, 
Lexington, Massachusetts. Landscape designer for 
the completion of a town-wide athletic field feasibility 
study and development of an Action Plan that identifies 
prioritized improvements and summarizes all study 
findings. Efforts include an inventory and analysis of 
all existing fields, courts, and ancillary facilities and 
amenities; a needs assessment process to identify 
and prioritize community needs for fields, courts, 
and related recreational elements; capacity analysis 
based on existing and future demand for facilities; 
development of a plan for upgrading facilities and/or 
building new facilities as necessary; and outline of a 
potential implementation process.
Evan Andrikos's Key Project Experience Cont.

Page 573

westonandsampson.com
Recreation and Parks Master Plan, Avon, Connecticut. 
Lead project manager responsible for client coordination, 
public engagement, inventory and analysis and development 
of the written report. After inventorying 19 parks, evaluating 
received field use data and engaging with key stake holders, 
the developed community-led master plan identifies gaps 
in service, inequities among sports and future recreational 
needs based on trends. The master plan will serve as a 
roadmap for future park improvements and development, 
guiding decision-making and resource allocation to create 
a more equitable, inclusive, and vibrant park system for the 
entire community.
Various Athletic Field Improvements, North Haven, 
Connecticut. Project manager for the development 
of a $7 million master plan for the North Haven Athletic 
Complex. Responsible for facilitating meetings with the town, 
developing master plan documents, and spearheading 
the development of bid documents and cost estimates. 
The master plan incorporates key elements requested 
by the town that will improve a variety of athletic fields. 
Improvements include locating future grandstands at 
both baseball and softball fields, baseball/softball field 
renovations, a new concessions building, a new 1,000 seat 
grandstand at the turf field, and tennis court renovations. 
With funding for Phase 1, Weston & Sampson prepared 
construction documents that addressed $3.5 million in 
improvements.
Key Project Experience
Emily Weckman
RLA
Landscape Architecture
19 Years of Experience | 3 Years with the Firm
Emily has provided landscape architecture services for 
projects ranging from schools and municipal parks to 
residential design. She has substantial knowledge of 
management, construction document development, and 
planting and detailing.
Title
Project Manager I
Office Location
Rocky Hill, CT
Education
2006, Bachelor of Science
Landscape Architecture 
University of Connecticut
Registrations/Certifications
Registered Landscape Architect:
CT No. LAR.0001344

Page 574

westonandsampson.com
State Comprehensive Outdoor Recreation Plan, 
Rhode Island. Assisted in executing the community 
engagement strategy for the plan. This robust, multi-
tiered approach ensured diverse and comprehensive 
feedback through a public opinion survey, targeted 
tabling events, interactive pop-ups, and focused 
group sessions with SCORP ambassador groups. The 
resulting data directly informed the development of 
targeted recommendations within the report.
North Common Park Improvements, Lowell, 
Massachusetts. Assisted in finalizing the bid 
documents for a park that features a renovated 50-
70 baseball diamond field, player area, concession 
building, and terrace. Identified as one of the open 
space impact projects by the City of Lowell, the North 
Common project has received funding from the 
American Rescue Plan Act (ARPA). This funding will 
transform North Common and other beloved parks 
around Lowell into inclusive and better-equipped 
community spaces. This effort involves approximately 
$850,000 to $900,000 in improvements.
Bartlem Park South Phase I Designs, Cheshire, 
Connecticut. Landscape architect responsible for 
supporting the completion of bid documents for Phase 
1 of this phased $14,870,000 master plan to renovate 
and enhance Bartlem Park. The master plan outlines a 
range of active and passive recreational improvements, 
including a great lawn, town green, paved walkways, 
nature trails, multi-purpose sports field, and parking. 
Phase 1 designs consist of the great lawn with a 
bandshell, paved walkways, multi-purpose sports field, 
and some additional parking. 
Main Street Reconstruction, Branford, 
Connecticut. Contributed to the preparation and 
finalization of bid documents for the $11 million, 
2,000-foot Main Street Reconstruction. This project 
encompassed a full spectrum of infrastructure 
improvements, including roadway resurfacing and 
realignment, modernized traffic signal systems, and 
upgraded underground utilities. Beyond the essential 
infrastructure, the project focused on enhancing the 
pedestrian realm with wider, ADA-compliant walkways, 
new street furniture, carefully selected and designed 
paving patterns, the incorporation of native plantings, 
and the implementation of a custom-designed 
roadside rain garden for improved stormwater 
management.
148 East Avenue Gap of the Harbor Loop Trail, 
Norwalk, Connecticut. Project manager responsible 
for the bid documents and associated permitting 
efforts for the 148 East Ave portion of the Harbor Loop 
Trail. The trail will feature close to 1,000 feet of new 
elevated boardwalk that will provide connectivity to 
existing trail sections along the NRVT trail system. This 
effort involves $3 million in improvements.
Putnam to Thompson Air Line Trail Gap 
Connection Project, Putnam, Connecticut. 
Assisted in preparing the conceptual cost estimate 
and marketing brochure for the town for the highlighted 
preferred trail route that Weston & Sampson 
developed. The projected cost is in the range of $9-$12 
million with the proposed site improvements ultimately 
closing the existing 1.8-mile trail gap between Putnam 
and Thompson. The multi-use trail design features trail 
improvements along the street, roadway improvements 
that include a rotary and a trail along the existing 
railroad.
Bushnell Gardens, Hartford, Connecticut. Assisted 
in completing design development documents and a 
cost estimate through design development. The park is 
uniquely located at the intersection of Gold Street and 
Wells Street which naturally forms a triangular urban 
park that pulls pedestrians into it as they travel through 
the city. The proposed improvements feature a raised 
performance plaza, gardens, terraces lawns and a 
water feature. (with former employer)
Stanley Quarter Park Site Improvements, New 
Britain, Connecticut. The redesign for the popular 
south side of Stanley Quarter Park addresses the 
many needs of the city and park users by providing 
a variety of passive and active recreation areas. Such 
improvements include lighted basketball courts, 
expanded playground, pavilion, sitting plaza, and 
picnicking areas. The park design also upgrades 
the parks circulation and connection by providing 
accessible ramps and stairs to the pond, an 
improved multi-use trail, and a designated parking lot. 
Responsible for design development, construction 
documents, and construction administration. (with 
former employer)
Emily Weckman's Key Project Experience Cont.

Page 575

westonandsampson.com
Various Athletic Field Improvements, North Haven, 
Connecticut. Landscape architect responsible for assisting 
with construction administration for the development of a 
$7-million master plan for the North Haven Athletic Complex. 
Improvements included locating future grandstands at 
both baseball and softball fields, baseball/softball field 
renovations, a new concessions building, a new 1,000 seat 
grandstand at the turf field, and tennis court renovations.
Implementation of Page Park Improvements, Bristol, 
Connecticut. Working with the team to prepare details, 
plans, and cost estimates as part of the firm’s efforts 
to prepare permit and construction documents for the 
implementation of the Page Park Master Plan. 
Moakley Park Phase A, Boston Parks and Recreation 
Department (BPRD), Boston, Massachusetts. 
Landscape architect managing the landscape design of 
Phase A of Moakley Park. Project efforts include landscape 
architecture, climate resiliency, environmental, geotechnical, 
utility, and electrical engineering, as well as subconsultant 
collaboration, including work with Stoss on landscape 
design and schematic design verification and with Nitsch on 
stormwater engineering.
Moakley Park Connectors, Boston Environment 
Department, Boston, Massachusetts.  Co-deputy 
project manager and design task leader for this FEMA-
funded project for the design and implementation of coastal 
flood protection strategies and tie-ins from Moakley Park to 
the surrounding neighborhoods. Responsibilities include 
analyzing existing utilities and conflicts; crafting technical 
Key Project Experience
Emily Bousaada-Hampton
PE, RLA, ENV SP
Landscape Architecture
9 Years of Experience | 2 Years with the Firm
Emily has diverse experience in landscape architecture and 
civil engineering, including grading and drainage design, 
hydrological / hydraulic analysis, environmental permitting, 
environmentally conscious planting planning, and public 
space design.
Title
Senior Landscape Architect and 
Civil Engineer
Office Location
Rocky Hill, CT
Education
2016, Bachelor of Science in 
Engineering 
Civil Engineering 
University of Connecticut
Registrations/Certifications
Registered Landscape Architect:
CT No. LAR.0001628
Professional Engineer:
CT No. PEN.0034643
Envision Sustainability 
Professional: No. 24724

Page 576

westonandsampson.com
report writeups; engaging the public for feedback 
on design options; generating alternate flood barrier 
connection options; and coordinating with technical 
experts, subconsultants, and a diverse stakeholder 
group to develop design consensus for continuing 
Moakley Park’s flood alignment across a technically 
challenging site.
Harbor Loop SoNo Wharf, Norwalk 
Redevelopment Authority. Senior Landscape 
Architect and Civil Engineer for the preparation 
of concepts, presentations and webinar surveys, 
preliminary documents, and cost estimates and 
attended all meetings with the client, stakeholders, 
and the public as part of the initial through preliminary 
design of three properties critical to the completion 
of the Norwalk River Valley Trail loop. Project efforts 
included analyzing the existing conditions; facilitating 
stakeholder interviews, focus group meetings, and 
two public meetings; and engaging CTDEEP at a 
preliminary application meeting to review concepts and 
determine permit requirements. The property called the 
Wharf was reimagined into a public space to serve the 
downtown, Maritime Aquarium, Sheffield Island Ferry, 
and visitors looking to explore the Norwalk River.
Saint Louis Sponge Park, Lowell, Massachusetts. 
Provided stormwater and utility design for the 
revitalization and redevelopment this critical open 
space in a community susceptible to environmental 
injustice into a high-performing, multi-functional, multi-
generational climate-resilience community resource. 
Improvements for Phase 1 include a new 5-12 nature-
themed play area, a splash pad, a picnic area, and 
resurfaced basketball courts. 
ARPA Open Space Capital Improvement Projects, 
Lowell, Massachusetts. Landscape architect/
engineer for the grant-funded redevelopment/redesign 
of four urban community parks in the City of Lowell, 
including O’Donnell Park, the North Common, Father 
Maguire Park, and Hadley Park. Responsible for 
providing stormwater and utility design services for all 
four parks.
Tarrytown Riverwalk Extension Feasibility Study, 
Tarrytown, New York. The feasibility study for this 
project analyzes a missing, critical link between the 
existing RiverWalk under the Cuomo Bridge (former 
Tappan Zee Bridge) to Losee Park. The path promotes 
multi-modal transportation within the region and 
recreational opportunities for visitors and locals. As 
a Civil Engineer-In-Training, analyzed multiple route 
options that traversed steep topography, Metro-North 
Railroad, and highway rights-of-way while trying to 
preserve natural resources and historical and scenic 
value. While collaborating with a multidisciplinary 
team, assisted with 12+ feasible design options 
with unique site features. Work included grading 
analysis, gathering, and combining significant survey 
information, sections, on-site visits, coordination with 
federal and municipal institutions, and designing 
sculptural elements incorporated into site features, 
Photoshop / InDesign renderings, and construction 
documents. (with former employer)
Norwalk River Valley Trail (NRVT) Phase II, 
Norwalk, Connecticut. Assisted with grading, 
attenuator implementation at a nearby bridge, trail 
cross-sections, and construction documents for a 
section that connects two discontinuous portions of 
the trail adjacent to the river. (with former employer)
Boardwalk Design at ‘WALK’ Bridge, Norwalk, 
Connecticut. In conjunction with the Norwalk 
Redevelopment Agency, Stantec worked to design a 
new waterfront, shared-use path, and boardwalk which 
finishes Norwalk River Valley Trail’s Harbor Loop Trail. 
The connection traverses under the new WALK bridge 
and connects the mixed-use ‘Sono’ District to the 
existing trail. As a civil engineering designer, assisted 
with the preliminary design for the alignment, compiling 
survey information and a pre-application questionnaire 
for the Department of Energy and Environmental 
Protection (DEEP) report. (with former employer)
Wil-Walk Feasibility Study, Norwalk River Valley 
Trail (NRVT), Danbury, Ridgefield, Redding, and 
Wilton, Connecticut. The section connects two 
discontinuous portions of the trail, starting in Norwalk 
and ending in Wilton. The route runs adjacent to 
the Rt. 7 & Rt. 15 interchange and will be integrated 
into the new interchange’s boulevard design. As a 
Civil Engineering Designer, she assisted with the 
logistics and proposed routes for the greenway trail 
encompassed by challenging terrain, woodlands, 
wetlands, highway right-of-way, private property, 
and railway corridor. She coordinated with municipal 
representatives to gather information about private 
property. She assisted with an over 6-million-dollar 
cost estimate for a feasibility study. Anticipated work 
includes pedestrian bridges, boardwalks, Conditional 
Letter of Map Revision (CLOMAR), drainage analysis, 
grading, and site analysis. (with former employer)
Emily Bousaada-Hampton's Key Project Experience Cont.

Page 577

westonandsampson.com
Renovations of Page Park, Bristol, Connecticut. 
Performed stormwater collection, detention and treatment 
design. Coordinated with utility companies for water, 
power, and sanitary sewer extensions into new park 
structures. Assisted landscape designers with grading and 
drainage challenges and created and refined details and 
specifications for construction of stormwater and public utility 
upgrades.
Municipal Separate Storm Sewer Systems (MS4) 
Permit Registrations and Stormwater Management 
Plans (SWMP), Wethersfield, Connecticut. Engineer for 
this project involving the MS4 permit registration, SWMP, dry 
weather screening, wet weather sampling, and stormwater 
mapping, as required by the 2016 Connecticut General 
Permit for the Discharge of Stormwater from Small Municipal 
Separate Storm Sewer Systems (MS4) Reissuance with 
Modifications. 
Municipal Separate Storm Sewer Systems (MS4) 
Permit Registrations and Stormwater Management 
Plans (SWMP), Guilford, Connecticut. Engineer for this 
project involving the MS4 permit registration, SWMP, dry 
weather screening, wet weather sampling, and stormwater 
mapping as required by the 2016 Connecticut General 
Permit for the Discharge of Stormwater from Small Municipal 
Separate Storm Sewer Systems (MS4) Reissuance with 
Modifications.  
Key Project Experience
Benjamin Hipsky
PE
Wastewater
6 Years of Experience | 7 Years with the Firm
Ben provides services related to wastewater, stormwater, 
site/civil, water, and environmental projects. His experience 
includes CAD work, as well as cost estimates, water 
flow calculations, water and stormwater sampling, field 
survey work, smoke testing, manhole inspections, 
catch basin inspections, CCTV supervision, CIPP 
supervision, construction inspection, and the design of site 
improvements.
Title
Senior Project Engineer
Office Location
Rocky Hill, CT
Education
2019, Bachelor of Science
Civil Engineering
University of Connecticut
Registrations/Certifications
Professional Engineer:
CT No. PEN.0037198
NASSCO PACP | LACP | MACP: 
No. P0037072-042022
OSHA 10-Hour Construction 
Safety & Health

Page 578

westonandsampson.com
Municipal Separate Storm Sewer Systems 
(MS4) Permit Registration, Orange, Connecticut. 
Engineer for this project that involves helping the town 
maintain compliance with the MS4 permit. Responsible 
for overseeing the dry weather outfall screening 
and testing; wet weather sampling; Illicit Discharge 
Detection & Elimination (IDDE) Investigations; source 
identification and removal; drainage mapping, 
inventory and evaluation; and report review. 
Waterbury Industrial Commons, Parking 
Expansion and Drainage Site Improvements, 
Waterbury, Connecticut. Assisted the engineer 
responsible for providing the design of the parking lot 
and associated site improvements, including a storm 
drainage system, site lighting, landscaping, erosion 
and sedimentation control, and sidewalks. 
Private Client, Industrial Wastewater Treatment 
Plant, Stratford, Connecticut. Assisted with site 
layout, parking, grading and stormwater management 
design, erosion and sedimentation control design, 
construction details, and preparation of bid documents. 
Avon Village Center, Avon, Connecticut. 
Assisted in the engineering peer review of 
project design documents, zoning compliance, 
stormwater management design and local permit 
applications associated with a large-scale downtown 
redevelopment project. Work includes preparation of 
technical report documents for presentation to the 
Town Planning and Engineering Departments. Efforts 
were repeated after a second submission to the town 
in the year following. 
Planning and Zoning Review, Greenwich, 
Connecticut. Assisted with the review of documents 
and plans submitted to the Town of Greenwich 
Planning and Zoning Department. Identified the 
sanitary sewer lines from proposed dwellings, as well 
as stormwater pipes, to help ensure codes and safety 
items were met. 
Department of Public Works Feasibility Study & 
Schematic Design, East Hartford, Connecticut. 
Performed building siting, area grading and stormwater 
design for the installation of a 20,000-square-foot fabric 
storage structure. Permitting assistance and utility 
coordination for fire suppression. Coordinated with 
the owner and architects for material preferences and 
sizing of structures. Performed turning movements to 
ensure accessibility to emergency and public works 
vehicles.
Public Works Facility Improvements, Bloomfield, 
Connecticut. Assisted with water system design 
modifications and construction administration. Also 
assisted the lead surveyor in finding existing boundary 
markers and marking existing landmarks, as well as 
overhead wires. The survey was completed for the 
potential purchase of the parcel.
Yarmouth DPW Facility, Yarmouth, 
Massachusetts. Assisted with the design and layout 
of the new DPW Facility. Compiled specifications 
regarding all site civil work including stormwater 
treatment and various utilities. Assisted with the yard 
grading and utility plans for the site including electrical, 
gas, water, septic, and drainage. Coordinated with the 
town regarding permitting and required information. 
Performed a turning movement for the town’s largest 
fire apparatus to ensure passage through the site. 
Sanitary Sewer Evaluation Survey, Stafford, 
Connecticut. Prepared a work plan that involved 
home inspections in search of illicit connections, 
smoke testing roughly 100,000 linear feet of 
pipe determine sources of inflow, and manhole 
inspections to rate and make recommendations on 
fixes for the towns sanitary sewer collection system. 
Worked with the client to locate additional manholes 
previously unmapped, which were causing additional 
unnecessary flow in the collection system. 
Sanitary Sewer Evaluation Survey, Bethel, 
Connecticut. Inspected the CCTV video for roughly 
40,000 linear feet of pipe and made recommendations 
on fixes rated on a need basis to reduce and ultimately 
eliminate sources of infiltration. Observed and 
inspected heavy cleaning of over 1,000 linear feet in a 
trouble area to ensure future cleaning and inspection is 
possible.  
Sanitary Sewer System Rehabilitation Design 
and Construction Administration Services, 
Phase 1 through Phase 4, Derby, Connecticut. 
Engineer II providing design and construction phase 
services implementing a multi-year collection system 
improvements project across the city, in accordance 
with the EPA approved Infiltration / Inflow Control Plan. 
Services included design, development of construction 
documents, and construction phase services related 
to the installation of several thousand feet of Cured In 
Place Pipe (CIPP) pipe, manhole lining, sewer lateral 
rehabilitation, and gravity sewer replacement. Duties 
included the review of pre and post CCTV inspection 
and development of as-built documents.
Benjamin Hipsky's Key Project Experience Cont.

Page 579

westonandsampson.com
Complete Streets Improvements for Maple Road, 
Mansfield, Connecticut. Senior team leader providing 
quality control reviews and supporting the project manager 
and design team. This LOTCIP project will reconstruct 
approximately 8,000 linear feet of Maple Road from the 
intersection of South Eagleville Road (Route 275) to Spring 
Hill Road as well as mill and overlay 2,000 linear feet of 
Spring Hill Road. An 8-foot-wide multi-use path will be 
constructed along the entire project corridor as well as a 
concrete sidewalk along Spring Hill Road. A rectangular 
rapid flashing beacon is proposed at a mid-block crossing, 
and an existing 42-inch CMP culvert will be replaced with 
a precast concrete box culvert. This project will create a 
continuous pedestrian connection between the Mansfield 
Middle School and Downtown Mansfield, as well as the 
UConn campus.
Multi-Use Path Design for Steele Brook Greenway, 
CTDOT State Project No 153-125, Watertown, 
Connecticut. Senior team leader supporting the project 
manager and design team in the delivery of final design. 
The project is a multi-use path with design including of 
3,800 linear feet of a multi-use trail with a parking lot and 
prefabricated pedestrian bridge over Steele Brook.
Key Project Experience
Erik Jarboe
PE
Transportation
20 Years of Experience | 1 Year with the Firm
Erik’s experience includes design, project management, 
and construction support. He brings expertise in highway/ 
roadway design, complete streets design, ADA & PROWAG, 
drainage design, NEPA, public outreach, and CTDOT 
programs and procedures.
Title
Senior Team Leader
Office Location
Rocky Hill, CT
Education
2005, Bachelor of Science 
Industrial Technology Tech 
Management 
Central Connecticut State 
University
2002, Associate of Science 
Technological Studies 
Tunxis Community College
Registrations/Certifications
Professional Engineer:
CT No. PEN.0029498
Associate DBIA, Design Build 
Certification Board

Page 580

westonandsampson.com
Trail Reconstruction & Accessibility 
Improvements on the Air Line Trail, Pomfret, 
Connecticut. Senior team leader providing quality 
control reviews and supporting the project manager 
and design team in the delivery of final design. This 
project will reconstruct approximately 4.3 miles of the 
existing Air Line Trail, with an unpaved, 12-foot-wide 
granular fill surface for pedestrians, bicycles, and 
equestrian riders from Route 44/169 in Pomfret, CT, 
to the Henry Breault Footbridge over the Quinebaug 
River in Putnam, CT. The proposed design includes 
trail surface reconstruction; drainage swale and pipe 
crossing improvements; embankment erosion repair; 
trailside safety measures; and structural walls, ramps, 
and stairs to allow users to descend 40 vertical feet, 
from the elevation of the former railbed embankment to 
the elevation at the southern end of the footbridge. This 
is a Transportation Alternatives Program project with 
funding for the design and construction provided by 
state and federal funding.
Highway Design Consultant Liaison Services, 
CTDOT, Statewide, Connecticut. Project Manager 
for highway design consultant liaison services for 
the CTDOT. Responsible for the direct oversight and 
management of consultant engineering firms delivering 
a variety of highway design tasks to the Department, 
including complete design of transportation safety 
improvement projects. (with former employer)
Modern Roundabout to Replace Pulaski Circle, 
CTDOT, Hartford, Connecticut. As consultant liaison 
engineer for CTDOT, coordinated the preliminary 
engineering phase of the project for the Department 
while managing and overseeing the Task Order firm 
performing the work. The project proposes replacing 
Pulaski Circle with a modern roundabout. This 
Preliminary Engineering Phase involved the collection 
of traffic data, forecasting (by CTDOT planning) that 
data into future volumes, developing multiple design 
alternatives along with redistributed volumes, and 
providing recommendations for preferred alternatives. 
(with former employer) 
Off-Ramp Removal for Exit 21 I-84 Eastbound, 
CTDOT, Waterbury, Connecticut. As consultant 
liaison engineer for CTDOT, coordinated and 
oversaw the Final Design phase of the project for 
the Department while managing and overseeing 
the Task Order firm performing the design. The 
project proposes to remove the existing Exit 21 off-
ramp from I-84 Eastbound in the city. The project 
includes extensive improvements to surface streets 
and intersections to adequately accommodate the 
rerouted traffic as a result of the ramp closure. ROW 
acquisitions, utility relocations, and coordination with 
an overlapping city project were also involved. (with 
former employer)
Pavement Rehabilitation & Safety Improvements 
for I-95, CTDOT, Westport, Connecticut. Project 
manager responsible for the re-evaluation of the 
project scope and development of the preliminary 
design. The project proposed to rehabilitate the 
pavement, upgrade the roadway drainage systems, 
widen existing outside shoulders, incorporate bridge 
upgrades, and provide roadside safety upgrades. (with 
former employer) 
Roadway Reconstruction of Wolcott Street, 
Bristol, Connecticut. Project manager coordinating 
all aspects of the project delivery. Directly responsible 
for supervising the design of the project including 
roadway design, drainage design, and concrete 
culvert repairs. The intent of the project was to 
reconstruct the current roadway, provide a sidewalk 
for pedestrians, widen shoulders for bicycles, improve 
roadway drainage, provide several roadway safety 
improvements along a reverse curve on a steep 
downhill grade, and improve intersection and stopping 
sight distances. Managed the LOTCIP process 
and coordinated with the city and the council of 
governments (COG). (with former employer)
Roadway Safety Improvements for Route 73, 
CTDOT, Watertown, Connecticut. Project designer 
responsible for the delivery of the project and permit 
applications from preliminary design through final 
PS&E of this CTDOT project. The project involved 
the realignment of two reverse curves, removal of 
an abandoned railroad bridge abutment, large rock 
cut, intersection improvements, roadway drainage 
upgrades and modifications, utility relocations, 
property acquisitions including a total acquisition, 
environmental permits, and sidewalks. (with former 
employer)
Erik Jarboe's Key Project Experience Cont.

Page 581

westonandsampson.com
Air Line Trail Reconstruction (SPN 111-126), Pomfret & 
Putnam, Connecticut. Project technical lead responsible 
for coordinating review and stamping of plans and providing 
design guidance on the preparation of construction plans 
depicting the resurfacing of the multi-use trail and drainage 
improvements along approximately four miles of the Air Line 
Trail in Pomfret and Putnam. Work included coordinating 
with multiple stakeholders including the Consultant Liaison 
Engineer, CTDOT, the Towns of Pomfret and Putnam, as 
well as various regulatory agencies to comply with all state 
and federal requirements. Responsibilities also included 
the design of the trail switchback to descend approximately 
40-ft, the creation of Right of Way maps for temporary 
construction access, and management of geotechnical and 
structural groups for the design of block retaining walls and 
slope stabilization efforts.
Steele Brook Greenway, Watertown, Connecticut 
(CTDOT State Project No 153-125). Project technical lead 
responsible for coordinating review and stamping of plans 
and providing design guidance on the preparation of final 
design plans. Project includes design of a multi-use trail with 
a parking lot and prefabricated pedestrian bridge. Reviewed 
design submissions for compliance with CTDOT, AASHTO, 
and PROWAG standards.
Key Project Experience
Jeffrey Santacruce
PE, PTOE
Transportation
31 Years of Experience | 7 Years with the Firm
Jeff delivers transportation and traffic engineering, design, 
management, and permitting services for diverse public and 
private projects. His experience includes rural, urban, and 
interstate roadway design; reconstruction; traffic calming; 
roundabouts; safety enhancements; and Complete Streets 
initiatives. He is also skilled in managing interdisciplinary 
projects, cost estimating, quality assurance and control, 
constructability reviews, construction administration, and 
stakeholder communication throughout public engagement.
Title
Practice Leader
Office Location
Manchester, NH
Education
1994, Bachelor of Science, cum 
laude
Civil Engineering
University of New Hampshire
Registrations/Certifications
Professional Engineer:
MA No. 50065
NH No. 10650
CT No. PEN.0030580
RI No. 15978 
VT No. 91133
ME No. 13637
FL No. PE85994 
SC No. 36732
NC No. 048917
TN No. 132263
GA No. PE053939
VA No. 0402070116
WV No. 027364
DE No. 24804
Professional Traffic Operations 
Engineer: DC No. 4394

Page 582

westonandsampson.com
Green Line Extension, Somerville, Medford, and 
Cambridge, Massachusetts. Senior traffic manager 
responsible for the review of maintenance traffic plans 
and traffic engineering-related design plans and 
submissions for this $2.3 billion design/build project 
to construct 4.5 miles of new light rail system for the 
Massachusetts Bay Transportation Authority (MBTA). 
The project includes construction of seven new 
stations, replacement or reconstruction of six bridges, 
and construction of a vehicle maintenance facility. As 
owner’s representative team member, responsibilities 
included reviewing traffic-related work product 
submissions on behalf of the MBTA to determine if 
the design-build team met the contract conditions for 
completeness, technical soundness, conformance 
with state and national standards, and accuracy, 
and provided comments to the MBTA. Submissions 
include design plans, maintenance of traffic plans, 
RFIs, and construction work plans. Additional work 
includes attendance at project meetings, coordination/
maintenance of traffic issues with the design-build 
team, field reviews, coordination of project permitting 
with cities and MassDOT, and public presentations.
On-Call Transportation Contract, Charleston 
County, South Carolina. Transportation engineer 
responsible for review of the several dirt road 
paving and drainage improvement projects. Lead 
transportation engineer involved in the review of the 
plans for the Azalea Fuel Facility construction.
Roadway Reconstruction to I-84 Intersection/
Interchange Improvements, Southbury, 
Connecticut. Traffic engineer responsible for 
reviewing traffic signal design, analysis, and MPT 
on improvements to Exit 14 along I-84, including 
improvements for pedestrians and bicyclists, drainage, 
roadway alignment, and intersection operations. 
Incorporated accommodations for Westbound off-ramp 
relocation and expanded Park N’ Ride Lot.
Community Comprehensive Plan and Zoning 
Update, North Providence, Rhode Island. Lead 
transportation engineer for update of the local plan 
of development. Revisions involve a full update of 
the town’s current plan, approval through the Rhode 
Island Division of Statewide Planning and significant 
public involvement. This project also includes a 
comprehensive update of the town’s Zoning Ordinance 
and Development Regulations. 
Comprehensive Master Plan Update, Westfield, 
Massachusetts. Lead transportation engineer for 
update of the local plan of development. The city 
had not updated their master plan in over 50 years. 
Revisions involve a full update of the city’s current 
plan. This project will add sections for energy, climate 
change, and water supply among others. It also 
includes a significant public engagement element. 
Route One Corridor Study, Westerly, Rhode 
Island. Lead transportation engineer for development 
of a strategic plan to revitalize this corridor. The 
overall goal of the study was to encourage the type of 
development that improves functionality and reflects 
Westerly’s character and charm. This major study of 
a five-mile commercial and residential corridor was 
completed on an expedited six-month schedule. It 
included several major public engagement events, 
a website, a public survey, stakeholder engagement 
and analysis of transportation, housing, economic 
development, aesthetics, and zoning.
Consulting Services for the American Rescue 
Plan Act (ARPA) Local Fiscal Recovery, South 
Kingstown, Rhode Island. One of two lead 
transportation engineers responsible for development 
of a strategic plan to revitalize five areas of the town 
and develop ARPA programming. Slated to receive 
$8.95 million over two years under ARPA, South 
Kingstown hired Weston & Sampson to provide 
specialized project development, design (civil, 
engineering, architecture, landscaping, and traffic 
engineering), and grant management services to 
maximize the town’s use of the ARPA funds to support 
their COVID-19 disaster response to economic 
recovery. These services include supporting the town 
with project management oversight and ensuring 
accountability, transparency, and compliance with all 
federal requirements.
Resilient Master Plan and Open Space and 
Recreation Plan, Westhampton, Massachusetts. 
Lead transportation engineer for preparation of a 
resilient local plan of development as well as an open 
space and recreation plan. This is the town’s first-
ever master plan. Development of the plan includes 
sections on agriculture, forestry, mining, climate 
change, economic development, energy, facilities 
and services, historic and cultural resources, housing, 
natural resources, open space, recreation, and 
transportation.
Jeffrey Santacruce's Key Project Experience Cont.

Page 583

westonandsampson.com
State Project 111-124; Air Line North State Park Trail 
Pedestrian Trail Crossings, Pomfret, Connecticut. 
Chief inspector and resident engineer for the construction of 
two new pre-fabricated steel pedestrian bridges and three 
pre-cast concrete arch pedestrian tunnels at five separate 
sites between Pomfret and Putnam along the existing trail. 
The project was administered in cooperation with the towns, 
CTDEEP and CTDOT, as well as coordination with the utility 
companies Eversource and Frontier. The work inspected 
included ground reinforcement of the soil foundations, 
installation of GRS-IBS Abutments and Wingwalls, reinforced 
structural concrete, erection of the superstructures, assembly 
of the three concrete arches, pervious structural backfill 
installation, roadway reconstruction and safety improvements 
at each site. 
State Project 63-618; Traffic Control Signal & 
Intersection Improvements, Hartford, Connecticut. 
Senior chief inspector / construction coordinator for 
inspection of construction for improvements to nine 
intersections in various locations within the city. Responsible 
for daily inspections of construction activities, compliance 
with material testing, processing change orders and 
other administrative documents. Presided over monthly 
progress meetings and engaged the contractor in periodic 
negotiation meetings, while providing coordination with 
the city engineering department, construction coordinator 
and the CTDOT District office personnel. Also responsible 
for supervising project inspection staff and ensuring staff 
access to any required resources to perform their duties.
Key Project Experience
Kevin Fahey
NICET IV
Transportation
32 Years of Experience | 18 Years with the Firm
Kevin’s resident representative experience includes 
reconstruction and safety improvements to highways and 
bridges, construction and supervision of a solar home, 
emergency and routine building renovations, and office 
building demolition. He holds NICET Level IV certification as 
an engineering technician in highway construction; NICET 
Level I certification as an engineering technician in bridge 
safety; NETCCP certification for hot mix asphalt, soils and 
aggregate, and concrete inspection; and is an American 
Traffic Safety Services Association certified Traffic Control 
Supervisor.
Title
Chief Certified Construction 
Inspector
Office Location
Rocky Hill, CT
Education
1993, Bachelor of Arts
English 
Franklin Pierce University
Registrations/Certifications
NICET Level IV: Certified 
Engineering Inspector, Highway 
Construction 
NICET Level I: Certified Inspector, 
Bridge Safety 
NETTCP: Certified Hot Mix 
Asphalt, Soils & Aggregate, & 
Concrete Inspector 
NETTCP: Certified Concrete 
Technician 
NETTCP: Certified Quality 
Assurance Technician 
ACI: Certified Concrete Field 
Testing Technician 

Page 584

westonandsampson.com
State Project 63-714; Weston Street, Jennings 
Road, and Boce Barlow Way Traffic Control 
Signals & Intersection Improvements, Hartford, 
Connecticut. Construction coordinator for inspection 
of construction for traffic signal and intersection 
improvements. Responsible for supervising the 
project chief inspector with daily inspections of 
construction activities, compliance with material testing, 
processing change orders and other administrative 
documents. Assisted the chief inspector with contract 
interpretations and resolution of RFIs and clarifications. 
Provided coordination with the city engineering 
department, project manager and the CTDOT District 
office personnel. Also responsible for ensuring staff 
access to any required resources to perform their 
duties. 
State Project 155-168; Park Road and State 
Route 501 Capacity, Safety & Operational 
Improvements; West Hartford, Connecticut. Chief 
inspector for this project involving the relocation of 
the I-84 Exit 43 off-ramp, so that it is adjacent to the 
existing on-ramp, and provided for safety, capacity and 
operational improvements. This project also includes 
three new traffic signals, intersection improvements, 
ADA accessible sidewalk ramps with pedestrian push 
buttons, highway illumination, the development of 
the new Town Gateway area and the reforestation of 
the old off ramp. In addition to thousands of feet of 
subsurface drainage, electrical and fiber-optic network 
cable, the entire site is being restored with over 1,000 
plantings and acres of turf establishment. 
State Project 94-239; Montauk Avenue Roadway 
Reconstruction, New London, Connecticut. Chief 
inspector and office engineer for the reconstruction 
of Montauk Avenue, Phase I. Work involved the full-
depth reconstruction of 1,800 feet of Montauk Avenue 
from Bank Street to Lawrence and Memorial Hospital, 
including intersection improvements at multiple 
cross streets. Additionally, the project included utility 
relocations, new ADA ramps, sidewalk, curbing, 
striping, signage, dedicated bike lane, and drainage 
modifications.
State Project 82-296; Westlake Drive Bridge 
Improvements, Middletown, Connecticut. Chief 
inspector and office engineer on a bridge replacement 
for Westlake Drive over Miner Brook. Work included 
the removal of triple corrugated metal pipes, and 
replacement with twin pre-cast concrete box culverts. 
Additional work included relocation a 12-inch water 
main over the new structure, and new sidewalk, 
guiderail, fencing, curbing, signage, and striping. 
State Project 134-139; Replacement of the 
New City Road Bridge over New City Brook, 
Stafford, Connecticut. Chief inspector for the 
installation of a 110-foot section of 16.8-foot x 8.3-
foot curved aluminum box culvert, including cast-in-
place reinforced concrete inlet and outlet headwalls 
and 465 feet of road reconstruction. Provided daily 
inspection of all construction activities and maintained 
all construction records in accordance with the policies 
and procedures of the CTDOT Construction Manual. 
Kept records using the SiteManager Software system. 
Coordinated field activities with CTDOT staff from the 
District 2 office in Norwich.
State Project 132-131; Reconstruction of Avery 
Street, South Windsor, Connecticut. Chief inspector 
and office engineer for the reconstruction of 2,300 
feet of Avery Street, as well as the realignment of the 
Avery/Beelzebub/Woodland intersection, to improve 
vertical and geometric sightlines. Work also included 
the complete replacement of the twin corrugated metal 
pipe culvert for Avery Brook with 65-inch and 73-inch 
arch reinforced concrete pipe culverts and headwalls, 
as well as new ADA ramps, sidewalk, curbing, striping, 
signage, and drainage installation.
State Project 132-127; Kelly Road Reconstruction, 
South Windsor, Connecticut. Chief inspector for 
the full-depth pavement reconstruction, drainage 
installations, sidewalk and driveway apron replacement 
and maintenance and protection of traffic tasks. 
Provided daily inspection of construction, prepared 
daily inspection reports and quantity calculations, 
prepared MAT100 material testing requests and 
construction orders, and maintained project records 
using the Manual 4 Book system. 
State Project 164-232; Rehabilitation of Day Hill 
Road, Windsor, Connecticut. Resident project 
inspector for 2,000 linear feet of full depth pavement 
reclamation with Superpave surface, involving 
Federal ARRA funding with Connecticut Department 
of Transportation oversight, and CTDOT Four Book 
Method of record keeping. 
Kevin Fahey's Key Project Experience Cont.

Page 585

westonandsampson.com
Windham Pump Station Grinder Pump Replacement 
and Associated Electrical Work, Windham, 
Connecticut. Managed the removal of an existing grinder 
pump and installation of a new pump. It was discovered that 
the electrical system was not adequate for the new pump 
and needed to be upgraded. Project team installed a new 
panel and conduit to successfully get the system up and 
running.
Norwalk First Taxing District New Canaan Water 
Treatment Plant Stop Log Replacement and Sluice gate 
Repair, New Canaan, Connecticut. Managed the removal 
of old stop logs in the mixing basin and repair leaking pipe 
penetrations. After new logs were replaced and the leaking 
was controlled, assisted in repairs to the sluice gate at the 
bottom of the mixing basin.
Connecticut Water Hillside Pump Station Pressure 
Reducing Valve (PRV) Replacement, Naugatuck, 
Connecticut. Managed the removal and installation of a 
new PRV for Connecticut Water’s pump station located in 
Naugatuck, Connecticut. Coordinated with Connecticut 
Water’s personnel for the required shut down when 
the final connections were to be made. The shut down 
was successful and the system was up and running as 
scheduled.
Key Project Experience
Rodney Van Deusen, Jr.
Construction, Maintenance, & Repair
43 Years of Experience | 5 Years with the Firm
Rodney provides project management/structural engineering 
for buildings and waterfront structures including construction 
management, property assessments, and field observation 
during construction. He has been responsible for project 
management and engineering for water and wastewater 
facilities, low- to mid-rise buildings and renovations, 
curtainwall design and construction, ferry terminals, 
piers, docks, bulkheads, relieving platforms, revetments, 
retaining walls, marinas, and specialized structures for the 
entertainment industry.
Title
General Manager
Office Location
Rocky Hill, CT
Education
1982, Bachelor of Science
Architectural Engineering
Wentworth Institute of Technology
1980, Associate Degree
Architectural Engineering
Technology
Wentworth Institute of Technology
1979, Associate Degree
Building Construction Technology
Wentworth Institute of Technology
Registrations/Certifications
Certified USACOE Quality Control
Systems Administrator / Quality 
Control Manager
SAS Work Diving Safety & 
Supervision Course Certificate
TWIC Card
Certified Diver - SDI

Page 586

westonandsampson.com
Connecticut Water Heritage Village Wet Well 
Wizard Installation, Southbury, Connecticut. 
Planned and managed the installation of a Wet Well 
Wizard for Connecticut Water’s Pump Station at 
Heritage Village. The project consisted of installation 
of a compressor on a new concrete slab underground 
piping, the “Wizard” ejector, and associated electrical 
work.
Norwalk Well Field PFAS Treatment Facility 
(Bridging Documents Phase), Norwalk, 
Connecticut. Provided construction feasibility 
expertise to the engineers for the development of the 
Bridging Documents for the Kellogg-Deering Well 
Field owned and operated by the First Norwalk Taxing 
District in Norwalk. This included meetings with the 
engineering staff, meetings with the client, meetings 
with the Connecticut Department of Health, review of 
potential designs, and schematic cost analysis.
Hill-In-Dale New Pump Station Design-Build, 
Jewett City Water Company, Connecticut. Provided 
support and cost estimating during preliminary design 
for the proposed new pump station for Jewett City 
Water Company located in Lisbon. The project is 
currently under review by the client and once funding is 
approved construction will begin.
Hartford Landfill Design-Build, Hartford, 
Connecticut. Provided support to the engineering 
team on multiple projects for the Hartford Landfill. 
Worked with the engineering department to design 
and construct new piping for two wells that were 
non-functioning, provided new PH and low Water 
monitoring sensors and electrical upgrades.
New Canaan Water Treatment Plant Settling 
Tank Upgrades, Norwalk, Connecticut. Managed 
construction for the tank upgrades of two settling 
tanks for the New Canaan Water Treatment Plant 
owned and operated by the Norwalk First Taxing 
District. Project included coordination with Norwalk’s 
vendor, demolition of the existing tank, installing new 
components and testing to ensure the system operated 
to the districts standards.
West Springfield Pipe Lining Project, West 
Springfield, Massachusetts. Assisted the Town of 
West Springfield in providing a solution for a leaking 
pipe the runs under the Great Brook in Southwick, 
Massachusetts. The recommended solution was to 
line the 16-inch existing pipe with a synthetic liner. We 
managed the construction team, which included a 
local excavating company and a national piping lining 
company. The entire project took two weeks, and the 
pipe was back in service before the peak demand 
season.
UCONN Competition Pool Grating and Bulkhead 
Grating Replacement, University of Connecticut, 
Storrs, Connecticut. Managed the replacement 
of approximately 400 feet of gutter grating and 
replacement of bulkhead panels for the competition 
pool at UNCONN. Coordinated closely with the 
University so as not to interrupt any scheduled 
competitions or programs.
Pools Tiling Project, Deerfield Academy, 
Deerfield, Massachusetts. Project consisted of 
hydro-blasting and tiling two pools at the Deerfield 
Academy. The two pools, one an eight lane 
competition pools and one 18-foot-deep dive pool, 
were stripped of their existing plaster finish and new 
tiling installed with a deadline on 40 calendar days. 
We provided overall project management and self-
performed some of the work.
Tootell Dive Pool Replastering Project, University 
of Rhode Island. Provided project management 
for the replastering of the 16-foot-deep dive pool. 
Project included hydro-blasting the pool to remove the 
existing plaster, replaster the pool, fill and balance the 
pool water, and retile several deck areas. The project 
schedule mandated that the pool had to be in-service 
within 30 days from the start of construction. Project 
was completed within the 30 days and the university 
was able to reopen on time.
Property Condition Assessments, Confidential 
Client. Conducted PCAs at properties valued over 
$120 million and greater than 30 years old to identify 
potential insurance liabilities. Conducted Level I PCAs 
with a particular focus on electrical, plumbing, and 
building envelope systems. (with former employer)
Property Condition Assessments, 300 Stillwater 
Avenue, Stamford, Connecticut. Conducted PCAs 
at properties valued over $4 million and greater 
than 30 years old to identify potential insurance 
liabilities. Conducted Level I PCAs were with a 
particular focus on electrical, plumbing, grounds, and 
building envelope systems. Provided and initiated 
recommendations for Level II inspections including 
thermal imaging scans of electrical systems and 
plumbing systems inspections. (with former employer)
Rodney Van Deusen, Jr.'s Key Project Experience Cont.

Page 587

westonandsampson.com
Heritage Village Wastewater Treatment Plant, 
Southbury, Connecticut. As chief operator, trained the new 
chief operator and assisted several operators to increase 
their certification level. Developed and oversaw numerous 
operations projects and several collections systems projects/
improvements. Also prepared the NPDES permit renewal 
application for the plant. 
New London Wastewater Treatment Plant, New 
London, Connecticut. As chief operator, trained the new 
chief operator and assisted with his transition to project 
management with preparation to successfully pass his 
Class IV certification exam. Also assisted operators and 
worked with regulators with solving difficult operational and 
collections systems issues. 
New Hartford Wastewater Treatment Plant, New 
Harford, Connecticut. As chief operator, worked with 
the town on setting up treatment plant and collections 
systems projects. Regularly attended town WPCA meetings 
and provided status reports to WPCA membership. Also 
worked with selected engineer on design elements for their 
upcoming treatment plant upgrade.
Key Project Experience
William Idarola, III
Operations & Maintenance
31 Years of Experience | 16 Years with the Firm
Bill has extensive wastewater operations and management 
experience, including operations, maintenance, and 
management of wastewater treatment plants of up to 10 
mgd. He has served as chief operator, operations supervisor, 
and project manager for numerous small advanced 
treatment systems and has directed daily activities of up 
to 10 operators. Bill’s background includes biological 
wastewater treatment of both large-scale and small 
package facilities. His experience includes system startups, 
troubleshooting projects, and resolving compliance issues.
Title
General Manager
Office Location
Rocky Hill, CT
Education
1998, Associate's Degree 
Science
Charter Oak State College
Registrations/Certifications
CT Class IV Wastewater Treatment 
Plant Operator
CT Class II Water Treatment Plant 
Operator
CT Class II Water Distributions 
Systems Operator
CT Class IV NEWEA-Wastewater 
Collections Systems Operator

Page 588

westonandsampson.com
Heritage Village and Gunnery School Wastewater 
Treatment Facilities, New Hartford and New 
London, Connecticut. Wastewater manager and chief 
operator for the New Hartford, New London, Heritage 
Village and Gunnery School WWTF’s. Responsible for 
management and operations of water and wastewater 
treatment systems through four regional offices in three 
states. He oversaw a team of more than ten operating 
several treatment systems.
Wastewater Treatment Operation and 
Management, Connecticut Water. Wastewater 
manager responsible for the management and 
operation of water and wastewater treatment systems 
through four regional offices in three states. Oversaw 
10 employees operating 10 plus treatment systems. 
He also assisted other operators in preparing for 
their certification exams.  He prepared and reviewed 
documents necessary for submission to DEP and 
DPH and made recommendations for budgeting 
and process changes. At Connecticut Water as the 
Operations Supervisor he was the Chief Operator of the 
Heritage Village WPCF in Southbury and supervised 
operation of six other wastewater facilities.
WPCA, New Haven, Connecticut. At the City of New 
Haven WPCA as a wastewater mechanic he operated 
and maintained wastewater lift stations. He was trained 
to troubleshoot operational and mechanical problems 
in the wastewater environment. Repaired and/replaced 
equipment in lift stations, pumps, seals, motors, grit 
channel and bar screen equipment. 
William Idarola, III's Key Project Experience Cont.

Page 589

westonandsampson.com
Geotech and Hydrogeologic Assessment of Bedrock, 
Multiple Sites, Bridgeport, Hamden, Stratford, and 
Trumbull, Connecticut. Hydrogeologist responsible for 
overseeing overburden drilling to confirm the bedrock 
surface depth, followed by the advancement of core barrels 
into the bedrock.  Collected and inspected bedrock cores for 
the presence of water-bearing fractures, competency, and 
potential sulfide-bearing minerals. Prepared geologic logs 
describing the overburden stratigraphy, depth to bedrock, 
bedrock mineralogy, and location and depth of water-
bearing fractures. Designed and directed the installation of 
bedrock monitoring wells, developed the wells, and collected 
groundwater samples for laboratory analysis.  
Seismic Refraction Surveys, Multiple Sites, Simsbury, 
Connecticut; Oxford, Connecticut; and Red Hook, 
New York. Team leader responsible for siting the locations 
of gravel-packed production wells within glacial outwash 
sediments. The projects included coordinating with a 
geophysical contractor to conduct seismic refraction 
surveys to determine the depth to bedrock across the 
permittable drilling areas. Prepared site maps showing the 
geophysical transects, reviewed the seismic refraction results 
and bedrock surface, and selected the proposed drilling 
locations to correspond with areas of deeper bedrock and 
optimized saturated thickness. 
Key Project Experience
Michael Kapareiko
PG, LEP
Water
24 Years of Experience | 5 Years with the Firm
Michael provides hydrogeology expertise related to water-
supply source development, testing and permitting, 
hydrogeologic assessment, and environmental site 
assessment projects. His experience covers a range 
of water-supply, hydrogeologic, and environmental 
site assessment services, implementing unique and 
efficient solutions using a multi-disciplined approach. 
Michael’s management approach focuses on developing 
strong relationships with project teams, regulators, and 
subcontractors to ensure successful completion of project 
objectives.
Title
Team Leader
Office Location
Rocky Hill, CT
Education
2001, Bachelor of Science
Geology
University of Connecticut
Registrations/Certifications
Licensed Environmental 
Professional: CT No. 569 
Certified Professional Geologist: 
NY No. 000482
HAZWOPER 40 hours 
HAZWOPER Supervisor Training 
8 hours 
CTDEEP Safe Boating

Page 590

westonandsampson.com
Hydrogeologic Assessment for Production 
Facility, Newtown, Connecticut. Project manager 
for hydrogeologic assessment of potential impacts 
associated with the construction of a mulch production 
facility within the aquifer protection area. Responsible 
for identifying potential sources of impacts to the 
stratified drift aquifer, evaluation of soil properties, 
calculation of travel time, design of containment 
structures and development of operational procedures 
and an incoming soil screening plan to mitigate 
potential impacts to the onsite watercourses and 
underlying aquifer. The findings and recommendations 
of the assessment resulted in the Town granting 
approval for construction and operation of the facility. 
(with former employer)
Hydrogeologic Assessment for New Housing, 
Greenwich, Connecticut. Project manager for 
hydrogeologic assessment of potential impacts 
associated with construction of new housing 
adjacent to wetlands. The assessment included soil 
classification and geologic logging, calculation of the 
area of additional impervious surface and stormwater 
and groundwater discharge to the wetlands. The 
assessment culminated with the preparation of a 
report that was submitted to the Town Inland Wetland 
Commission and concluded that the construction 
would not significantly impact the adjacent wetlands. 
(with former employer)
Hydrogeologic Assessment, Greenwich (2), 
Monroe, Oxford and Westport, Connecticut. 
Project manager for hydrogeologic assessment 
conducted to evaluate soil suitability for installation 
of large onsite wastewater renovation systems. 
Oversaw the drilling of soil borings and excavation 
of test pits and directed the installation of monitoring 
wells. Collected in- situ soil samples for falling head 
permeability testing, performed sieve analysis and 
conducted slug testing. Data evaluation included 
calculation of hydraulic conductivities, travel time to 
sensitive receptors, nitrogen dilution and phosphorous 
adsorption. (with former employer)
Former Manufacturing Site, Bridgeport, 
Connecticut. Project manager for investigation 
and interim remediation of a 76.5-acre former 
manufacturing site that contained an inactive 
industrial landfill, 55 former underground storage 
tanks (USTs) and two former metal hydroxide sludge 
beds. Completed a comprehensive review of prior 
environmental files and assisted with preparation of 
the Phase I ESA report that identified over 200 areas of 
concern (AOCs). Assisted with developing the Phase II 
and III work scopes and sampling plans, was directly 
responsible for managing daily field investigations 
which included up to five drill rigs and 15 field staff 
per day and resulted in the drilling of approximately 
1,500 soil borings and the installation of more than 240 
monitoring wells. Phase II and III activities included 
direction and oversight of geophysical investigations 
to delineate the extent of industrial fill and solid 
waste and locate USTs and buried drums, support of 
ecological risk assessments (SLERA and BERA), and 
water characterization and profiling. Data compilation 
and evaluation included expedited review of field and 
laboratory data to direct the iterative delineation of 
release areas, preparation of groundwater elevation 
contour maps, geologic cross sections, Phase II and 
III ESA reports and Significant Environmental Hazard 
reports. Remediation activities included developing 
interim remedial action plans (RAP), securing the 
necessary Town and State permits, excavation of 
TSCA waste, significant environmental hazard areas, 
and hot spots, recovery of free-phase petroleum and 
development of the site-wide remedy. (with former 
employer)
Remediation of Former Manufacturing Facility, 
Winsted, Connecticut. Project manager for Phase III 
ESA, soil and groundwater remediation, compliance 
monitoring and verification of a former manufacturing 
facility subject to the Connecticut Property Transfer 
Program. Coordinated and conducted Phase III 
investigations, directed and oversaw UST removal and 
soil excavation at four releases areas, and coordinated 
and conducted compliance and post-remediation 
groundwater monitoring. Subsequent to the completion 
of remediation, a verification report was prepared 
that documented that all AOCs that existed prior to 
the transfer of the property had been investigated in 
accordance with prevailing standards and that soil and 
groundwater were in compliance with the CTDEEP 
Remediation Standard Regulations (RSRs). (with former 
employer)
Michael Kapareiko's Key Project Experience Cont.

Page 591

westonandsampson.com
Pequabuck River Flood Study, Plymouth, Bristol, 
and Plainville, Connecticut. Project manager for the 
preparation of a flood study and flood mitigation plan for 
the 18-mile reach of the Pequabuck River, covering three 
communities in central Connecticut. Project included 
preparation of HEC-REC riverine model, development 
of flood mitigation measures, and conceptual design of 
channel improvements to alleviate flooding.
Stream Channel Improvements to Entry Dingle Brook 
at Tiffany Street, Springfield, Massachusetts. Project 
manager for the hydraulic analysis of the Entry Dingle 
Brook culvert and channel to prevent slope failure of stream 
embankments and provide a stable stream channel. 
Utilized HEC-RAS for the hydraulic model and FHWA HEC-
11 computational methods for stream bank erosion and 
countermeasure design.
Byram Park and Pool Redevelopment, Greenwich, 
Connecticut. Team leader responsible for conducting a 
technical review of the water and sewer utility design. 
Peer Review Services for the Village Center 
Development, Avon, Connecticut. Team leader 
overseeing a peer review of the designed plans for this 
mixed-use development, incorporating commercial and 
retail, residential, and arts space.
Kingsley Hill Road Improvements, Monroe, 
Massachusetts. Project Manager overseeing the 
preparation of the Massworks grant application and design 
of proposed roadway safety improvements along Kingsley 
Hill Road.
Key Project Experience
Robert Tedeschi
PE
Wastewater
40 Years of Experience | 10 Years with the Firm
Bob has extensive experience in civil and water/wastewater 
engineering. He has designed and rehabilitated sanitary 
sewers, force mains, and pumping stations, and conducted 
I&I and SSES studies. His water resources work includes 
supply planning and designing municipal water systems 
and booster stations. He has managed numerous site/
development projects and on-call task-order assignments for 
public and private-sector clients.
Title
Senior Team Leader
Office Location
Rocky Hill, CT
Education
1995, Master of Science 
Civil Engineering 
University of Connecticut 
1985, Bachelor of Science 
Environmental Engineering 
University of New Haven
Registrations/Certifications
Professional Engineer: 
CT No. PEN.0016756 
MA No. 46598 
NJ No. 24GE04307400 
PA No. PE058739E 
RI No. PE.0007340 
SC No. 22315 06-10031 
Board Certified Environmental 
Engineer

Page 592

westonandsampson.com
On-Call Assignment, Bristol Water Department, 
Bristol, Connecticut. Project manager for the City 
of Bristol Water Department. Supervised the design 
of various water distribution system improvements, 
including water main, well field, and booster station 
design and water distribution system modeling, GIS 
mapping, and water storage tank inspection.
On-Call Services to the WPCA, Torrington, 
Connecticut. Provided QA/QC for the design of 
improvements to the wastewater collection system 
based upon the recommendations of the Phase II 
SSES findings. Improvements included cured-in-place-
pipe (CIPP) and structural improvements to manholes.
Wastewater Pumping Station Upgrades, Various 
Locations, Milford, Connecticut. Developed 
Basis of Design Report for the planned upgrades to 
five wastewater pumping stations. Pumping station 
improvements included: new Exterior Diesel Generator, 
ATS, and controls, new pump control systems, mini 
split unit heat pump for heating and cooling, abandon/
demo steel dry pit structure to avoid Confined Space 
Entry, and converting wet pit to a Submersible 
Pumping Stations. The design was completed in 2022 
with construction to begin in spring of 2023, with an 
estimated construction budget of $4.4M. 
Sewer Extension, Pomfret Connecticut. Provided 
project management and oversight services related to 
the design of four sanitary sewer pumping stations and 
approximately seven miles of sanitary force main sewer 
in local roads, state roads, and cross country east to 
the Putnam treatment plant. 
Route 190 Wastewater Pumping Station, Stafford 
Springs, Connecticut. Project Manager for a multi-
discipline design-build effort to design and construct 
improvements to the RT 190 Pumping Station.  
Improvements consist of the replacement 500 gpm 
pumps, valve chamber piping and fittings, electrical 
upgrades, and a new control building and generator.  
Overseeing the review and processing of shop 
drawings and RFIs.   
Burtville Avenue and South Division Street 
Wastewater Pumping Stations, Derby, 
Connecticut. Project manager responsible for 
overseeing construction phase services for the Burtville 
Avenue and the South Division Street wastewater 
pumping stations, which have a firm capacity of 250 
gpm and 350 gpm respectively. Oversaw the review 
and processing of shop drawings, RFIs, change 
orders, and overall project schedule and budget. The 
project was completed in 2017, on time and $100,000 
under budget. 
New Public Works Facility, Waterbury, 
Connecticut. Provided technical review for 
engineering services for a new 120,000-square-foot 
consolidated public works facility including a new 
vehicle maintenance facility for Fire Department 
apparatus. The design included a new aboveground 
fuel system, including a double-sided fuel island, a 
new fuel management system programmed to track 
fuel usage by employee and by vehicle, and two 
concrete encased double-walled steel aboveground 
fuel tanks. 
Route 6 Water Main Replacement for Connecticut 
Water (CT Water), Plymouth, Connecticut. Project 
manager for the design of a replacement water main 
adjacent to and spanning two bridge structures along 
Route 6. Work included coordination with CTDOT, Town 
of Plymouth, and adjacent utilities.
North Eagleville Road Area Infrastructure 
Repair / Replacement and Update, University of 
Connecticut, Storrs, Connecticut. Principal and QA/
QC reviewer responsible for overseeing preparation of 
condition assessment, design and construction phase 
services for various utility replacement and upgrades in 
the North Eagleville Road area of the Storrs Campus.
Roosevelt Drive Wastewater Pumping 
Station Improvements, Derby, Connecticut. 
Project manager for the design of a new 2,800-
gpm wastewater pumping station to replace the 
pumping station on Route 34 in Derby. Work 
included coordination with multiple utility companies 
(Eversource, Regional Water, and Derby WPCA) and 
coordination and permitting with the CTDOT, CTDEEP, 
local Inland wetlands, and Planning & Zoning.
Four Corners Collection System and Pumping 
Station Upgrades, Mansfield, Connecticut. 
Project manager for the design of two new wastewater 
pumping stations and approximately 18,000 linear feet 
of new gravity sewers along Routes 44 and 195 and 
adjacent areas. Work included coordination with utility 
companies (e.g., Eversource and CT Water) as well as 
coordination and permitting with the CTDOT, CTDEEP, 
and local Inland wetlands and planning/zoning boards.
Robert Tedeschi's Key Project Experience Cont.

Page 593

westonandsampson.com
Brownfields Environmental Site Assessments, 
Southeastern Connecticut Council of Governments 
(SECOG), Multiple Properties, Southeast Connecticut.  
Project manager for conducting environmental site 
assessments at four former industrial properties in Southeast 
Connecticut, including Phase I, II, and III environmental 
site assessments (ESAs) at three former mill building 
sites and one former fuel terminal site. These former 
industrial properties are currently vacant, but each are 
planned for significant redevelopment in their respective 
municipalities. The Phase I ESAs included a review of 
existing site conditions, a review of previous environmental 
reports and regulatory history. Phase II ESAs included the 
collection and analysis of soil and groundwater samples 
for various constituents of concern (COCs) at identified 
areas of concern (AOCs), including per- and polyfluoroalkyl 
substances (PFAS) due to former textile manufacturing and 
past structure fires. 
South Meadows Redevelopment Considerations Study, 
MIRA Dissolution Authority – Hartford, Connecticut. 
Project manager for the environmental multidisciplinary 
study of the 80-acre former waste-to-energy South Meadows 
facility on the banks of the CT River. Study included a 
hazardous building material survey of former power 
block and waste processing buildings, review of soil and 
groundwater remediation and regulatory status, assessment 
of the site’s flood protection system, evaluation of potential 
future uses, and the preparation of remediation and building 
demolition opinions-of-cost for several industrial/commercial 
and residential reuse scenarios. The study included 
Key Project Experience
Robert Carr
PE, LEP
Environmental
38 Years of Experience | 2 Years with the Firm
Robert has extensive experience conducting and 
overseeing environmental projects, including all phases 
of environmental site assessments, release investigations, 
closure assessments of underground storage tanks (USTs), 
and the design and permitting of soil and groundwater 
remediation systems. He also has experience in the design 
and installation of remediation systems, including soil vapor 
extraction, chemical oxidation, bioremediation, and air 
sparging. Robert has completed several types of engineering 
opinions-of-cost for the cleanup and improvement of various 
industrial and commercial facilities.
Title
Senior Technical Leader
Office Location
Rocky Hill, CT
Education
1993, Bachelor of Science 
Environmental Engineering 
University of Hartford, Connecticut
1987, Bachelor of Science
Civil Engineering 
Worcester Polytechnic Institute
Registrations/Certifications
Professional Engineer: 
CT No. PEN.0018567 
NY No. 73889 
RI No. 7563
Licensed Environmental 
Professional: CT No. 314
OSHA 29 CFR 1910.120(e)(3)(i) 
40-Hour HAZWOPER
OSHA 29 CFR 1910.120(e)(8) 
8-Hour Annual Refresher
OSHA 29 CFR 1926 10-Hour 
Construction Safety & Health 

Page 594

westonandsampson.com
substantial community outreach including stakeholder 
interviews and three public meetings.
CH Nickerson – MDC South Hartford Conveyance 
and Storage Tunnel Pump Station (Contract No. 
3), Connecticut. Served as the Qualified Environmental 
Professional (QEP) for the MDC’s three year long, 
$160M wastewater tunnel pump station project. 
Prepared the project’s Soil Management Plan (SMP) 
and conducted PCB soil investigations per TSCA 
regulations, waste characterization of soil and fill 
(total volume expected to be over 30,000 cubic yards) 
and reviewed project compliance with applicable 
stormwater and construction dewatering permits. 
ExxonMobil Service Station, Danbury, 
Connecticut. Served as lead investigator in evaluating 
degree and extent of gasoline release into the bedrock 
aquifer in the vicinity of private drinking water wells. 
The investigation included borehole logging to identify 
contaminant carrying fracture zones and the 1st time 
use of a FLUTEtm Liner in the State to sample the 
contaminant fracture zones and prevent cross-fracture 
contamination. Also responsible for remedial system 
design of dual extraction bedrock treatment system.
Goodwin College Riverside Drive Campus, East 
Hartford, Connecticut. Provided LEP and asset 
recovery services to clean up and redevelop four 
former petroleum terminals and jet engine laboratory 
into Goodwin University’s Riverside Campus and 
two magnet high schools. Conducted and managed 
the environmental investigation and remediation of 
ecologically sensitive areas along the Connecticut 
River in East Hartford. Assisted in applying for and 
managing three U.S. EPA remediation brownfields 
grants awarded to Goodwin College. Assisted 
in providing an eligibility case for each site, the 
community relations plan, and completed the technical 
portions of ACRES reporting updates. Prepared Quality 
Assurance Project Plans (QAPPs) to demonstrate 
compliance with the Connecticut Remediation 
Standard Regulations (RSRs). (with former employer)
Pathways Academy for the Advancement 
of Design and Technology, East Hartford, 
Connecticut. Designated LEP for the environmental 
investigation and remediation of the former industrial 
property that is occupied by a new regional high 
school. Oversaw the completion of the Phase I, II 
and III environmental site assessments (ESAs) for 
the property which identified areas of pesticide and 
petroleum contamination. LEP services included 
oversight and confirmation of the excavation and 
disposal of contaminated soil to meet residential clean-
up standards, and LEP Verification of the site under the 
CT Transfer Act. (with former employer)
Hamilton Place I, Hartford, Connecticut. Providing 
LEP and environmental engineering services as part 
of site redevelopment for this industrial property in 
the Parkville District. Under CT’s Property Transfer 
Law, conducted Phase III site investigations to assess 
the degree and extent of soil and groundwater 
contamination, and prepared a mitigation plan 
to address chlorinated VOCs, and petroleum 
products beneath the building. Prepared plans and 
specifications for removal of contaminated soil and the 
installation of sub-slab depressurization system (SSDS) 
that allowed the building to be safely redeveloped and 
occupied by mix-use tenants. 
RGH Bartholomew, LLC, Hartford, Connecticut. 
Providing LEP and environmental engineering services 
as part of site redevelopment for this mostly vacant 
industrial property in the Parkville District. Conducted a 
Phase I/II ESA for the property and assisted the owner 
with applying for available Brownfields Assessment 
grants through CRCOG. Once the Phase III ESA is 
completed, prepared a remedial action plan (RAP) to 
remediate the property for site redevelopment. 
243 Vergason Avenue, Norwich, Connecticut. 
Providing CT LEP services and prepared Phase II 
and III environmental site assessments (ESA) for a 
former medical supply manufacturing facility. The 
ESA included the collection of soil and groundwater 
samples to evaluate areas of concern (AOC) identified 
on the property. Also prepared the Remedial Action 
Plan and remediation opinions-of-cost to establish 
the environmental escrow between buyer and seller. 
LEP services to date have included assistance with 
CT Property Transfer Law Form III, preparation of an 
environmental condition assessment form (ECAF) and 
RAP. (with current and former employer)
Robert Carr's Key Project Experience Cont.

Page 595

westonandsampson.com
John Zbell
LEP, PG, CPG
Environmental
27 Years of Experience | 5 Years with the Firm
John has extensive experience conducting and overseeing 
investigations of soil and groundwater impacted by various 
contaminants; soil management and disposal planning; 
underground storage tank closure; and landfill monitoring. 
He has led multidisciplinary project teams on a variety 
of environmental projects for private sector, state, and 
municipal clients. He has developed remedial action plans 
and designed, permitted, installed, and maintained various 
soil and groundwater remediation systems. John has also 
been responsible for estimation of long-term environmental 
liability and cost estimation.
Key Project Experience
City of Hartford Department of Public Works, 
Hartford, Connecticut. Project manager responsible for 
an investigation to evaluate soil and groundwater quality 
adjacent to existing UST systems planned for removal, 
and soil quality in the area of a proposed AST system. 
Following discovery of PCB-impacted soil at the property, 
assisted with the preparation of a letter summarizing the 
applicability of state and federal regulations when managing 
this material. Developed a proposed remedial action plan 
to address petroleum-impacted soil near the existing UST 
system. Assisted project team with preparation of bid plans 
and specifications for planned petroleum tank replacement 
activities, including management of contaminated soil. 
Coordinated environmental monitoring activities during AST 
system construction and UST system closure, and updates 
to the CT DEEP ezFile and REACT online portals.
New Milford Public Schools, New Milford, Connecticut. 
Project manager/client manager responsible for coordinating 
with the school district to manage their above and below 
ground fuel storage facilities and comply with applicable 
state and federal regulations. Following an inventory survey 
and inspection of each fuel system, completed alongside 
a licensed tank contractor, a database was created that 
summarized the status of each system, including key 
observations, and recommendations for achieving and/
or maintaining compliance with applicable regulations. 
At one facility that was subject to a CT DEEP Notice of 
Violation (NOV) for noncompliance with life expectancy 
requirements under the CT UST Regulations, the project 
team worked with the school district to permanently close 
Title
Team Leader
Office Location
Rocky Hill, CT
Education
1998, Bachelor of Science
Geology
Dickinson College
Registrations/Certifications
Licensed Environmental 
Professional: CT No. 531
Professional Geologist: NY No. 
731
Certified Professional Geologist: 
American Institute of Professional 
Geologists No. 11341
OSHA 40-Hour HAZWOPER
OSHA 8-Hour HAZWOPER 
Refresher
OSHA Supervisor Training, 8-Hour 
HAZWOPER

Page 596

westonandsampson.com
the UST system and satisfy the requirements of the 
NOV. UST closure activities included conducting a 
pre-closure environmental investigation, environmental 
monitoring and contractor oversight during removal of 
the UST system, preparation of a UST Closure Report, 
and updating the CT DEEP ezFile system. At another 
facility, the team conducted a feasibility analysis for 
replacement of the heating-oil UST system, prepared 
bid plans and specifications for planned petroleum 
tank replacement activities and is preparing to oversee 
UST system closure activities.
Retail Petroleum Sites, Various Cities/Towns, 
Connecticut. Project manager/client manager 
responsible for investigation and remediation of 
petroleum-impacted soil and groundwater at over 30 
current and former retail gasoline stations entered into 
various CT DEEP cleanup programs. Coordinated 
and supervised Phase I, II, and III investigations, 
sensitive receptor surveys, UST closure activities, 
sampling and maintenance of granular activated 
carbon (GAC) treatment systems on potable water-
supply wells, and remediation, as necessary, with 
milestone application submittals to the CT DEEP UST 
Petroleum Clean-Up Account Program. Remediation 
activities included design, permitting, installation and 
operation of various types of remediation systems, 
including soil vapor extraction/air-sparge, multi-phase 
extraction, oxygen gas-diffusion, chemical injection, 
and remedial excavation, dewatering and groundwater 
reclassification. (with current and former employer)
Sampling of POTWs, Various Cities/Towns, 
Connecticut. Project manager/client manager 
responsible for implementing a CT DEEP-sponsored 
sampling program to evaluate concentrations of per- 
and polyfluoroalkyl substances (PFAS) at 35 publicly 
owned treatment works (POTWs). Activities included 
coordinating the collection of influent, effluent, and 
sludge samples at the POTWs during two different 
seasonal sampling events. The scope of work also 
included the collection of surface-water and fish tissue 
samples from nearby surface water bodies at 10 of the 
locations. Following review and analysis of the data, 
worked with project team to prepare a comprehensive 
report summarizing sampling and analytical methods, 
laboratory results, a discussion of the data, and 
recommendations for future actions.
Petroleum Bulk-Storage Terminal, Bantam, 
Connecticut. Project manager/client manager 
responsible for investigation and remediation of 
petroleum-impacted groundwater to successfully abate 
a Significant Environmental Hazard resulting from 
proximity of nearby private water-supply wells. Project 
activities also included the preparation of an updated 
SWPPP for the facility and coordinating inspections, 
sampling, and reporting to comply with SWPPP, SPCC 
plan, and CT DEEP permit requirements. (with former 
employer)
South End Drainage Study, Stratford, 
Connecticut. Project manager responsible for 
assessment of soil quality prior to planned realignment 
and widening of stream channel in connection with 
proposed drainage improvements. Soil samples 
collected from test borings completed in proposed 
excavation areas were submitted for laboratory 
analysis for constituents common in industrial fill. The 
laboratory results were reviewed to determine soil 
quality and options for management, including reuse in 
accordance with the CT DEEP Remediation Standard 
Regulations and/or offsite disposal. Prepared a memo 
summarizing the results of the soil quality evaluation 
and options for managing the excavated material.
Manchester Landfill, Manchester, Connecticut. 
Project manager/client manager responsible for 
managing environmental and engineering-related 
services at an active municipal solid waste landfill. 
Permit-required environmental monitoring tasks 
included quarterly groundwater and surface-water 
monitoring, and leachate seep inspections/sampling 
under a CT DEEP Discharge Permit, as well as surface 
methane emissions monitoring under an EPA permit. 
Managed staffing, budgeting, client coordination, 
and technical review for the preparation of quarterly 
and annual summary reports documenting the 
environmental monitoring activities and findings. Also 
managed multi-disciplinary team activities related 
to monitoring and operational optimization of the 
methane gas collection system. Managed operation, 
maintenance, and repairs to methane gas flare system 
and associated leachate condensate collection system. 
Coordinated quality assurance inspections and Title 
V compliance monitoring and reporting. Worked with 
the project team to coordinate stormwater inspections, 
sampling, and reporting in accordance with CT DEEP 
permit requirements. Oversaw review and approval 
of applications for acceptance of Specialty Waste 
under a CT DEEP permit. Worked with project team 
to provide additional environmental and engineering 
support services, as needed, including expansion of 
gas collection system and evaluation of landfill filling 
practices.
John Zbell's Key Project Experience Cont.

Page 597

westonandsampson.com
Tufts University, Medford, Massachusetts. Led the 
aquatics team in the design of a new 50-meter stretch 
competition facility from concept through construction 
documents under a design-build delivery method. The 
design features split bulkheads, 1-meter and 3-meter diving, 
deck level gutters, a state-of-the-art competition timing 
system, and panelized stainless steel pool technology.
University of Pennsylvania, Philadelphia, Pennsylvania. 
Led the aquatics team in the renovation of a 50-meter 
competition facility during the construction phase. The 
scope of renovation included a new retractable bulkhead, 
new deck level stainless steel gutters, a new pool entry stair, 
main drains and piping, and new energy and water efficient 
recirculation and treatment equipment.
Lincoln Park Pool Renovations & Reconstruction, 
Albany, New York. Led the aquatics team for design of 
new pool layout, including a zero-entry pool with spray 
equipment, while integrating accessibility, sustainability, and 
modern safety standards. Project also included replacement 
of the existing pool body (listed on the State and National 
Register of Historic Places) and construction of a new 
auxiliary bathhouse and filter building.
Hommocks Outdoor Pool, Mamaroneck, New York. 
Led the aquatics team for the design and planning through 
the construction of a pool facility. Key design elements 
included a zero-depth entry pool, splash pad, new restroom 
and locker facility, shade structures, site amenities, and 
reconfigured driveway access and parking areas. 
Key Project Experience
Patrick Bates
AIA, NCARB
Aquatics
23 Years of Experience | 2 Years with the Firm
Patrick has experience working on multi-disciplinary project 
teams involving the design and management recreational 
facilities, mixed-use developments, and commercial interior 
projects. His experience primarily involves the design of 
aquatic facilities, including indoor, outdoor, and rooftop 
pools; splash pads; spas; and steam and sauna facilities.
Title
Practice Leader
Office Location
Suffern, NY
Education
2004, Master of Architecture
University of Florida
2002, Bachelor of Design
Architecture
University of Florida
Registrations/Certifications
Registered Architect: 
PA No. RA410770 
CT No. ARI.0015739 
FL No. AR95050 
NY No. 034621-01 
NJ No. 21AI02283100 
DE No. S5-0019348 
MD No. 22041 
ME No. ARC5840 
NH No. 05412 
NV No. 9508 
RI No. 5946 
SC No. AR.11799 
TX No. 31946 
MA No. 954552
VT No. 003.0134731 
VA No. 0401020794 

Page 598

westonandsampson.com
Brian J Slavin Pool Complex, Shrub Oak, New 
York. Led the aquatics team for the design of gutter 
replacement for four outdoor pools, including a lap 
pool, diving well, wading pool and activity pool. The 
project included the development of multiple gutter 
replacement options for competitive bidding.
Glen Mary Pool, Bar Harbor, Maine. Led the design 
and planning of a large ovular outdoor wading pool 
complex that is also used for winter ice skating. Key 
design elements included a wide beach entry, spray 
features, deck areas, additional toilet facilities, and 
shade structures. 
Greater Plymouth Community Center, Plymouth 
Township, New Jersey. Led the construction 
administration of a full equipment replacement project 
for three indoor pools, including a lap and diving 
pool, a large family activity pool, and a whirlpool 
spa. The equipment features energy efficient pumps, 
water efficient regenerative media filters, ultraviolet 
sterilization, and pool water heating through the 
recapture of dehumidification heat rejection.
Hillside Park, Philadelphia, Pennsylvania. Led 
the design of a pool replacement project for the 
City of Philadelphia Parks and Recreation. An initial 
assessment revealed that the pool was beyond 
salvage and needed replacement. The new design 
includes a recessed stair alcove and supports youth 
swimming competition.
North End Community Center, Boston, 
Massachusetts. Led the aquatics team for the design 
and planning of new recreation center for the City 
of Boston Public Facilities Department. The aquatic 
program included two pools; an outdoor recreation 
pool and an indoor lap pool. The planning phase 
included the development of multiple scenarios for 
accommodating the program on the waterfront site.
Pennsauken Pool, Pennsauken, New Jersey. Led 
the aquatics team for the design and planning of a new 
multi-purpose pool and splash pad facility. Key design 
elements included a beach entry, splash pad, water 
slide, lap lanes, and diving area, along with all new 
equipment and piping.
Roy Wilkins Recreation Center, Queens, New 
York. Led the aquatics team for a design competition 
for a new City recreation center. The pool featured 
eight competition lap lanes, 1 meter dive stands, and 
was configurable to water recreation activities such 
as volleyball, basketball, and water polo, as well as 
aquatic fitness, and learn to swim programs.
Indoor Aquatic Facility at The Youth Opportunity 
Union, Poughkeepsie, New York. Provided design, 
engineering, and project management services for 
an indoor aquatic facility within a proposed $50M 
community recreation center. The facility includes an 
eight lane, 25-yard competition pool and an adjacent 
family pool. Both pools feature concrete construction, 
regenerative filtration, and fully recessed stainless-steel 
gutters with integrated evacuator system for removal of 
harmful disinfection byproducts at the water surface. 
(with former employer)
Municipal Pool Complex, Scarsdale, New 
York. Conducted a facility survey and prepared an 
existing conditions assessment, and scoping report. 
Administered a community-wide survey and conducted 
community engagement sessions. Reported on 
survey data and feedback. Administered a market 
assessment. Developed reconstruction concepts and 
presentation to the community at a public meeting. 
(with former employer)
Rooftop Amenity Pool at One Java Street, 
Brooklyn, New York. Designed a new 800-square-
foot outdoor rooftop amenity pool for a new mixed-use 
development on the Brooklyn waterfront. This first of 
a kind large scale urban development utilizes 100% 
geothermal technology to heat and cool the building. 
The pool is constructed of fully welded stainless steel 
on steel dunnage and is heated with two 10-ton water 
source heat pumps. The pool features an underwater 
bench and is finished in ceramic tile. Secured 
Department of Health application approval. (with 
former employer)
Stainless-Steel Rooftop Amenity Pool at One 
Dock Street, Stamford, Connecticut. Provided 
design, engineering, and project management services 
for a new stainless-steel rooftop amenity pool for a 
high-rise residential development project. Coordinated 
the aquatics design with architectural, structural, MEP, 
and landscape disciplines. Secured Department of 
Health application approval. Performed progress 
inspections. (with former employer)
Indoor Lap Pool & Whirlpool Spat at One High 
Line, New York, New York. Provided construction 
administration services for a two-lane indoor lap 
pool and whirlpool spa in a new mixed-use high-rise 
development. Facilitated Department of Health permit 
issuance. (with former employer)
Patrick Bates's Key Project Experience Cont.

Page 599

westonandsampson.com
Byram Park Pool Replacement, Greenwich, 
Connecticut. Led the aquatics design aspects related to the 
design and engineering of a new park and public outdoor 
pool facility with a large zero-entry pool with lap lanes, a 
splash pad, and a kiddie pool to replace an outdated facility 
on the site. 
Children’s Aquatic Center at Chelsea Piers, Stamford, 
Connecticut. Provided aquatics design services for a 6,000 
square-foot water play pool, including three giant slides, a 
zero-depth entry area, mini water slides, and interactive play 
features. 
John F Kennedy Memorial Park, Barnstable, 
Massachusetts. Lead aquatic designer for the strategic 
restoration of John F. Kennedy Memorial Park. Managing the 
design of significant upgrades to the ornamental pool and 
fountain, including creative renovation/restoration strategies 
that respect the original design and appropriately honor the 
beloved past president.
Menotomy Hunter Fountain Evaluation, Arlington, 
Massachusetts. Team leader for the evaluation of the 
Menotomy Hunter Fountain and adjacent reflecting pool 
in the Winfield Robbins Memorial Garden. Responsible for 
working with the Historical Commission to determine the 
extent and type of repairs required to appropriately renovate 
the historic bronze statue created by sculptor Cyrus E. Dallin 
in 1911 and the leaky reflecting pool.
Key Project Experience
Timothy Sheehan
CPO
Landscape Architecture
30 Years of Experience | 1 Year with the Firm
Tim is a landscape architect and aquatics designer who 
provides design, production, and project management 
services for a large variety of projects, including high-end 
residential, resort and hospitality, water parks, large-scale 
residential communities, and municipal and commercial 
properties.
Title
Director of Design
Office Location
Boston, MA
Education
1995, Bachelor of Science, cum 
laude
Landscape Architecture
University of Massachusetts at 
Amherst
Registrations/Certifications
Commercial Pool Operator: No. 
466965

Page 600

westonandsampson.com
George Robert White Memorial Fountain 
Restoration, Friends of the Public Garden, 
Boston, Massachusetts. Responsible for providing 
aquatic design/landscape architectural services to 
restore the mechanical function of the George Robert 
White Memorial Fountain at the Public Garden. Worked 
with a multi-disciplinary team to design, permit, and 
complete the preservation and restoration work of the 
historic fountain, which was originally constructed in 
1924.
Worcester Common WWII Memorial Fountain, 
Worcester, Massachusetts. Provided aquatic 
design/landscape architectural services related to 
the development of a $600,000 decorative fountain 
at Worcester Common. The fountain project involves 
development of an intricate series of water jets; 
specialized lighting; two large granite piers engraved 
with the names of the 678 Worcester residents who 
perished in the war; decorative iron fencing; interpretive 
signage; and landscaping.
Tufts University Pool Capital Improvements 
and Renovations, Medford, Massachusetts. 
Led the aquatics design for the Tufts University 
pool renovations, including design and compliance 
upgrades for this large municipal pool. Project work 
included bringing the swimming and wading pools 
into compliance with the Virginia Graeme Baker Act, 
providing engineering for a chemical feed system, 
updating the hydraulic system, and making compliance 
upgrades around the deck of the pool and in the 
filtration facility.
Basquil-Sheehan Park and Hunt Memorial 
Pool Master Planning Services, Manchester, 
New Hampshire. Team leader for the preparation 
of a master plan, including alternative schematic 
plans showing the redevelopment possibilities for 
the southern portion of the Basquil-Sheehan Park 
property, cost estimates, and phasing considerations. 
Facility components included a new aquatic facility 
and a variety of other recreational elements, including 
a lap pool, spray deck, facility support buildings, 
improved access and visibility, a skate park, children’s 
playground, pickle ball courts, and new parking areas. 
Bulfinch Crossing (formerly Government 
Center Garage) Rooftop Pool, HYM Investment 
Group, Boston, Massachusetts. Provided aquatic 
engineering services for stainless steel rooftop pool in 
the heart of downtown Boston near Government Center 
designed in conjunction with CBT Architects. Provided 
construction drawings and specifications for pool.
Residences at Boston Landing Pool, HYM 
Investment Group, Brighton, Massachusetts. 
Provided aquatic engineering services for stainless 
steel rooftop pool designed in conjunction with 
Elkus Manfredi Architects. Provided construction 
drawings and specifications as well as construction 
administration for this pool at New Balance 
Corporation’s new mixed-use sports, commercial, and 
residential development.
YMCA Aquatics Facilities, Various Locations, 
Massachusetts. Providing design services for 
aquatics facilities at the YMCAs in Lynn, Framingham, 
and Attleboro, Massachusetts.
Albany Street Rooftop Pool, Boston, 
Massachusetts. Aquatic designer for the fully-tiled 
500-square foot heated rooftop pool facility that 
includes a remote equipment room with an automated 
control system for a high-rate sand filter, UV treatment, 
and gas heater. 
Millennium Tower Pool, Boston, Massachusetts. 
Aquatic designer for an indoor swimming pool and spa 
at the high-rise Millennium Tower. The pool was set 
with a crane and rigging crew in the middle of winter to 
keep the 60-story building construction on schedule. 
Laguna Splash Water Park at DelGrosso 
Amusement Park/Water Park Expansion, Tipton, 
Pennsylvania. Aquatic designer for site design/
layout and renovations including a wave pool/lazy river 
feature with themed building/support structures and 
spray features that reflect the family’s Italian heritage. 
Designed improvements to enable the DelGrossos 
to provide family-based entertainment at a multi-
generational recreation facility.
Boston Bruins Therapy Pools at the Warrior Ice 
Arena, Brighton, Massachusetts. Aquatic design 
for three therapy pools. Responsible for coordination 
with the training staff to ensure the pools met their 
physical training needs; coordination with the architect, 
owners, and MEP tradespeople. The design included 
coordinating and working with the pre-manufactured 
stainless steel pool company, and designing a 
complete filtration system to meet the demands.  
Timothy Sheehan's Key Project Experience Cont.

Page 601

westonandsampson.com
Community Center Splash Pad Maintenance Building, 
Newtown, Connecticut. Lead architect for the design of a 
new maintenance building to support the new splash pad 
at the Newtown Community Center. Building includes a 
restroom, mechanical equipment room, and storage area.
Memorial Pool Feasibility Study, Simsbury, 
Connecticut. Project architect for development of a 
feasibility study for renovations to an existing park restroom 
& storage facility to support a new splash pad & playground 
area.
District-Wide Renovations and Additions to Various 
K-12 Buildings, New York. Provided architectural design 
and construction administration services for various K-12 
school buildings and facilities throughout New York State, 
including:
• Beacon City School District 
• Wappingers Central School District 
• Hunter - Tannersville Central School District 
• Ravena-Coeymans-Selkirk Central School District 
Wappingers Central School District, Fishkill Plains, 
New York. Responsible for the design, construction 
documentation, and administration of an 18,530-square-foot 
transportation facility, including a vehicle repair shop with a 
washbay and administration wing.
Key Project Experience
Brian Gottschalk
RA
Architecture, Programming & Design
24 Years of Experience | 4 Years with the Firm
Brian has experience designing and administrating 
educational, commercial, and public works projects. He 
has demonstrated expertise in leading multi-disciplinary 
teams through all phases of project development, from 
conceptual design through construction administration. 
Brian’s proficiency in leveraging advanced design software 
to streamline project workflows and enhance collaboration 
has led to impactful design solutions in renovation and new 
construction projects.
Title
Team Leader
Office Location
Rhinebeck, NY
Education
2001, Bachelor of Arts
Architecture
State University of New York at 
Buffalo
Registrations/Certifications
Registered Architect:
NY No. 032385
CT No. ARI.0016350
OSHA 10-Hour Construction 
Safety & Health

Page 602

westonandsampson.com
Hudson City School District, Hudson, New York. 
Assisted in the design and construction documentation 
of a new 20,200-square-foot pre-K through fifth-grade 
elementary school. Additions included classrooms, 
offices, a library, and a gymnasium.
Anderson Center for Autism, Hyde Park, New 
York. Provided architectural design and construction 
documentation for campus ADA accessibility upgrades 
and facility improvements.
Dutchess Community College, Poughkeepsie, 
New York. Project architect responsible for the 
design and construction documentation of roofing 
replacements at five campus buildings along with 
general site improvements including sidewalk, 
staircase, and railing replacements. Currently 
responsible for design of improvements to the parking 
garage located on campus.
Department of Public Works Facility, Ardsley, New 
York. Assisted in the planning, design, and technical 
coordination of all disciplines for the Village of Ardsley’s 
new public works facility. Provided final architectural 
design and construction documentation utilizing 
building information modeling software.
New Department of Public Works Facility, 
Colonie, New York. Responsible for providing 
construction administration services for construction 
of a new 9,000-square-foot operations facility for the 
Division of Pure Waters.
Moakley Park Operations & Maintenance Facility, 
Boston, Massachusetts. Designed a Net Zero 
Carbon building incorporating sustainable and passive 
design strategies. Collaborated with the landscape 
design team to integrate the building with the redesign 
of the park landscape. 
Brian Gottschalk's Key Project Experience Cont.

Page 603

westonandsampson.com
On-Call Mechanical/Electrical/Plumbing Services, 
Groton, Connecticut. Project manager for mechanical, 
electrical, and plumbing services for generator and pumping 
station upgrades for the Town of Groton. 
On-Call Mechanical/Electrical/Plumbing Services, 
University of Connecticut. Project manager for 
mechanical, electrical, and plumbing upgrades and 
improvements for the University of Connecticut.
Public Works Facility, Bloomfield, Connecticut. Senior 
mechanical engineer responsible for overseeing the design 
of code related safety improvements such as full fire sprinkler 
protection and updated Mechanical Systems including HVAC 
and CO/NO2 gas extraction for this DPW facility upgrade. 
Byram Park Pool, Greenwich, Connecticut. Senior 
mechanical engineer for the complete electrical design for a 
new pool and splash pad. Electrical design consisted of new 
electrical service to the site, power, lighting and fire alarm 
systems to the pool equipment room and to the restrooms 
and kitchen areas as well as a completely new grounding 
and bonding plan for the pool and splash pad.
Town Hall HVAC Update, Stonington, Connecticut. 
Project manager for services to update the historic Town 
Hall’s HVAC systems, including an existing conditions 
analysis and design solutions including a new high-
efficiency, gas-fired, condensing boiler system and high-
efficiency, air-cooled chillers. All work will be done in a 
manner to preserve the historic character of Stonington Town 
Hall.
Key Project Experience
Scott Henriques
PE, LEED AP® O+M, CEM
MEP
32 Years of Experience | 12 Years with the Firm
Scott specializes in mechanical, electrical, plumbing/fire 
protection, and communication technology projects, and has 
designed numerous central heating and chiller plants, as well 
as HVAC systems for a variety of clients. He has expertise in 
analyzing and implementing energy-efficient systems and 
has helped clients increase system efficiency with substantial 
cost savings. Scott brings a hands-on perspective to 
mechanical systems design and has successfully managed 
projects totaling more than $200 million in construction.
Title
Senior Team Leader
Office Location
Foxborough, MA
Education
1993, Bachelor of Science, cum 
laude
Mechanical Engineering 
University of Massachusetts, 
Dartmouth
1985, Graduate
Naval Nuclear Power School 
1984, Graduate 
Advanced Machinist Mate School
Registrations/Certifications
Professional Engineer: 
CT No. PEN.0030722 
FL No. 96951 
ME No. 13850 
MA No. 40721 
NH No. 14582 
NY No. 094392-1 
RI No. 0013159 
SC No. 41544 
TX No. 137349 
LEED AP® Operations + 

Page 604

westonandsampson.com
Yarmouth Department of Public Works Facility 
(DPW), Yarmouth, Massachusetts. Senior HVAC 
engineer for this approximately 40,000 SF new state-of-
the-art DPW. The DPW primarily consists of a vehicle 
maintenance bay, vehicle storage area, various shops, 
locker rooms, and an administration wing. Heating 
for the facility is provided by a 2 million BTH high-
efficiency, gas-fired, condensing boiler plant. Cooling 
for the administration wing is a high-efficiency, split DX 
condensing unit supplying and 6,000 CFM indoor VAV 
air handler. The vehicle maintenance bays are heated 
by a hot-water radiant floor heating system, ventilated 
by a 9,000 CFM heat recovery unit, and supported by 
a dedicated vehicle exhaust system and high-volume 
low-speed ceiling fans. The shops and vehicle storage 
are heated and ventilated by dedicated hot water 
heating and ventilating units. The vehicle maintenance, 
vehicle storage areas, and shops are protected with 
a CO/NO gas detection system which initiates an 
automatic purge and/or alarm upon detection of 
noxious gases. The entire facility’s HVAC system is 
controlled by a web-based DDC building management 
system.
New Public Works Facility, Longmeadow, 
Massachusetts. Provided mechanical, electrical, and 
plumbing services for a new public works facility, which 
includes office/office support space, employee facilities 
(locker/shower/toilet/break and training), trade shops, 
vehicle maintenance, vehicle wash, salt shed, fueling 
facility, and vehicle and equipment storage areas. 
Incorporated sustainable design elements including 
natural daylighting, heat recovery, smart lighting 
controls, and a solar-ready roof.
Boston University Pool, Boston, Massachusetts. 
Senior mechanical engineer for the assessment and 
design of the university’s pool improvements project. 
The project included a holistic approach to identifying 
the source of contamination including pool water 
samples and a complete natatorium HVAC system 
evaluation. Design and installation of an integrated UV 
system to add a higher level of sanitary filtration.
Lynn YMCA, Lynn, Massachusetts. MEP manager 
as part of a team responsible for MEP/FP and aquatics 
design services for this 70,000-square-foot YMCA in 
Lynn, which will have a ~8,700-square-foot natatorium 
with lap and teaching pools and a splash pad.
Natatorium HVAC Deficiencies, Boston University, 
Boston Massachusetts. Senior technical advisor for 
the complete reconfiguration of the poorly performing 
natatorium HVAC system. The existing system 
was short circuiting, conditioning air directly from 
high supplies to high returns therefore not properly 
ventilating and conditioning the space. This was 
the main cause of the systems’ inability to properly 
dilute and remove chloramine contamination which 
is a health hazard to both the swimmers, divers, and 
spectators. The solution involved a complete redesign 
of the air distribution system with special care given 
to ensure the high temperature supply air reached 
the occupied pool and deck without exceeding 
the recommended 30 FPM deck velocity and a 
substantial portion of the return side of the system was 
reconfigured as very low returns. The project utilized 
computational fluid dynamics analysis (CFD) to verify 
the new designs effectiveness was successful.
HVAC Upgrades at Boston University | CARB-X 
(Sub to Beacon Architectural Associates), 
Boston, Massachusetts. Services for the renovation/
build-out of office space, including evaluation of 
existing condition of mechanical, plumbing, electrical 
power, lighting, and fire alarm systems. Plans and 
specifications for plumbing, HVAC, and electrical 
systems, as well as bid period and construction 
administration services.
ASHRAE Level II Audit, Preliminary Design, and 
Construction Oversight, Roxbury Community 
College, Roxbury, Massachusetts. Senior 
mechanical engineer for the ASHRAE Level II energy 
and water audit, preliminary design, and construction 
oversight of this ESCo project. Recommended 
measures included updated HVAC systems lighting, 
lighting controls, energy management system, 
domestic water fixture replacement, variable frequency 
drives, electric metering and monitoring systems 
for management purposes. Key measures were the 
900 MW of solar PV, and integration of a 125-well 
geothermal heat pump system.
Scott Henriques's Key Project Experience Cont.

Page 605

westonandsampson.com
Byram Park Pool, Greenwich, Connecticut. Provided 
complete electrical design for a new pool and splash pad. 
Electrical design consisted of new electrical service to 
the site, power, lighting and fire alarm systems to the pool 
equipment room and to the restrooms and kitchen areas as 
well as a completely new grounding and bonding plan for 
the pool and splash pad.
Lincoln Park Design Services, Somerville, 
Massachusetts. Team leader and senior electrical engineer 
for the upgrades to the park. Upgrades included a new 
electrical service, new sports lighting and pedestrian lighting. 
Provided all coordination with the electric utility. Provided a 
new bonding system for the splash pad.
DCR Massasoit State Park, Taunton, Massachusetts. 
Project consisted of upgrades to the electrical utility 
infrastructure throughout the campground. Provided 
detailed design for the electrical utility power throughout the 
campground, including all new electrical duct banks and 
transformers. Delivered power and communications to each 
of the campsites.
Langone Park & Puopolo Playground, Boston, 
Massachusetts. The project consisted of lighting and 
power upgrades to the park. Provided detailed design for the 
new incoming electrical utility services for the power to the 
park, sports lighting, pedestrian lighting, and throughout the 
site.
Key Project Experience
Daniel Marchand
MEP
28 Years of Experience | 11 Years with the Firm
Dan is experienced in the design of electrical systems 
for a wide variety of facilities, including wastewater and 
water treatment plants, colleges, laboratories, industrial, 
retail, mixed-use, municipal, healthcare, education, and 
others. He has worked on projects from conception 
through construction, collaborating closely with clients. His 
expertise extends to all aspects of project design, including 
system evaluations, load calculations, equipment sizing, 
code review, specification development, and construction 
administration.
Title
Team Leader
Office Location
Manchester, NH
Education
1997, Bachelor of Science
Electronic Engineering
Wentworth Institute of Technology

Page 606

westonandsampson.com
Harambee Park Master Plan, Dorchester, 
Massachusetts. Project consisted of upgrades to the 
Harambee park. Upgrades were completed in multiple 
phases. Provided design for multiple electrical utility 
services coming into the park, power to sports lighting, 
power to pedestrian lighting, power to splash pad, and 
the relocation of existing utility service to accommodate 
one of the sports fields. Provided communications 
throughout the park via a town-wide fiber optic system. 
Boston Parks & Recreation Department (BPRD) 
Malcolm X Park Refurbishment, Boston, 
Massachusetts. Upgrades to the park were 
completed in multiple phases. Provided detailed 
design for multiple electrical utility services coming into 
the park, power to sports lighting, power to pedestrian 
lighting, power to splash pad, the relocation of existing 
utility service to accommodate one of the sports fields 
and provided communications throughout the park via 
a town-wide fiber optic system. 
Boston Parks and Recreation Ryan Playground, 
Boston, Massachusetts. Team leader for the 
upgrades to the Ryan playground. Upgrades included 
a new electrical service, new sports lighting and 
pedestrian lighting. Provided all coordination with the 
electric utility.
Prescott Park Phase 1 Final Design, Portsmouth, 
New Hampshire. Project consisted of upgrades to 
the electrical utility infrastructure throughout the park. 
Provided detailed design for the incoming electrical 
utility power to the park and all new electrical power 
throughout the park which included power to several 
existing buildings, power to the docks, and power for a 
theatrical stage.
Burlington Department of Public Works Facility 
(DPW), Burlington, Massachusetts. Team leader 
and senior electrical engineer for this new state-of-
the-art DPW. The DPW primarily consists of a vehicle 
maintenance bay, vehicle storage area, various shops, 
locker rooms and administration wing. Services 
included new Fire Alarm system, New wiring for all 
HVAC, Plumbing and industrial equipment, Access 
control system, lighting and lighting controls to meet 
the latest energy codes.
Newton Highlands Playground, Newton, 
Massachusetts. Team leader for the upgrades to the 
Newton Highlands playground. Upgrades included 
a new electrical service, new sports lighting and 
pedestrian lighting. Provided all coordination with the 
electric utility.
Public Works Facility Study & Design, Bloomfield, 
Connecticut. Provided electrical engineering services 
for the design of renovations to the existing facility 
and two major additions, an administration wing and 
three additional vehicle maintenance bays. Project 
also included a stand-alone vehicle wash building, 
canopy structures for outdoor storage of vehicles and 
equipment, and an above-ground vehicle fueling island 
with a canopy for a total of 11,000 square feet of new 
construction.
New Department of Public Works Facility, 
Hopkinton, Massachusetts. Electrical engineer for 
design of a new Department of Public Works Facility, 
complete with ground improvements, salt shed, fuel 
island, and materials storage area. 
New Public Works Facility, Longmeadow, 
Massachusetts. Provided mechanical, electrical, 
and plumbing services for a new Public Works 
Facility. Facility includes office / office support space, 
employee facilities (locker/shower/toilet/break and 
training), trade shops, vehicle maintenance, vehicle 
wash, salt shed, fueling facility, and vehicle and 
equipment storage areas. Incorporated sustainable 
design elements including natural daylighting, heat 
recovery, smart lighting controls, and a solar-ready 
roof.
New Department of Public Works Facility, 
Rochester, New Hampshire. Provided mechanical, 
electrical, and plumbing services for a new Public 
Works Facility. The facility will incorporate sustainable 
design elements including natural daylighting, heat 
recovery, high-efficiency radiant floor and ceiling 
mounted infrared heating system, smart lighting 
controls, high-efficiency cooling systems, and a solar-
ready roof.
Salem Probate and Family Court House, Salem, 
Massachusetts. Electrical design for the complete 
renovation of the existing 75,000-square-foot court 
house including all office areas and court rooms.
Building Assessments, Shrewsbury, 
Massachusetts. Prepared a detailed electrical report 
of the existing conditions for all electrical systems 
includ¬ing power, lighting, fire alarm, security, and 
tel/data within 10 of the town’s buildings, including 
schools, town hall, police station, and fire station.
Daniel Marchand's Key Project Experience Cont.

Page 607

westonandsampson.com
Boston City Hall and Plaza Renovations, Boston, 
Massachusetts. Led Weston & Sampson’s geotechnical 
design for the 7-acre $70M Boston City Hall Plaza 
Renovation for the City of Boston Public Facilities 
Department. Three MBTA Green Line subway tunnels 
and associated vent structures located under the plaza 
complicated redevelopment of the site, as did the need for 
on-site stormwater management. Proposed loads from the 
plaza on the tunnels (constructed in 1898) and potential 
associated differential settlement required creative solutions 
for the proposed improvements. The project included raising 
grades on the nearly 120-year-old subway tunnels and a new 
below grade building daylighting on to the street level and 
cantilevering over the tunnel supported on micropiles. 
Wayland High School Athletic Facility, Wayland, 
Massachusetts. Coordinated and observed borings and 
test pits at two proposed athletic facility sites in support of 
proposed sports fields, tennis and basketball courts, sports 
lighting structures, and stadium seating. Prepared boring 
logs, site plan, and geotechnical recommendations report.
Memorial Stadium, Dartmouth, Massachusetts. 
Provided geotechnical engineering services as part of the 
comprehensive study and follow-on designs for improvement 
of Dartmouth Memorial Stadium. Efforts for the phased 
renovation of the stadium include developing designs for a 
new turf field, improved lighting, renovated bleachers, a new 
press box, and new concession and ticket stands, among 
other site amenities.
Key Project Experience
Tulin Fuselier
PE
Geotechnical
26 Years of Experience | 9 Years with the Firm
Tulin specializes in geotechnical engineering. Her diverse 
experience includes providing geotechnical engineering 
design and construction services for projects ranging from 
high-rises with up to four levels of below-grade parking to 
small buildings, various sized bridges, water/wastewater 
pipelines in urban and suburban areas, levee design 
following Hurricane Katrina effects, dam rehabilitation, 
climate resilient design, a pedestrian tunnel in urban setting, 
and railway extension through metro-Boston. In addition, 
Tulin is fluent in English, German, and Turkish.
Title
Practice Leader
Office Location
Reading, MA
Education
2006, Master of Science
Geotechnical Engineering
Tufts University
1999, Bachelor of Science
Environmental Engineering
Louisiana State University
Registrations/Certifications
Professional Engineer:
MA No. 47146
ME No. 13327
OSHA 40-hour Hazwoper

Page 608

westonandsampson.com
Arborway Bus Facility Modernization, MBTA, 
Boston, Massachusetts. Lead geotechnical engineer 
responsible for geotechnical engineering design for 
a 950,000-square-foot, multi-level bus maintenance 
facility. The first all-electric bus maintenance facility in 
Massachusetts, this facility will have the capacity to 
store and maintain 200 buses with a mix of 40- and 60-
foot vehicles. Weston & Sampson provided structural, 
mechanical, plumbing, and resilience design and 
modeling services in coordination with Jacobs for the 
conceptual design effort. Contract value is $4,539,000.
North Reservoir Dam Rehabilitation, Winchester, 
Massachusetts. Engineer of Record for Phase II dam 
investigations and rehabilitation of the 780-foot long, 
25-foot tall poor conditioned, HIGH hazard potential 
earth embankment dam. Investigations included 
topographic and bathymetric survey; subsurface 
investigations; hydrologic and hydraulic analyses; 
geotechnical analyses including seepage, slope 
stability and liquefaction; alternative analyses; and 
development of conceptual repairs and associated 
cost estimates. The design included broadening the 
embankment crest, flattening, buttressing against 
liquefaction, armoring the slopes, constructing a 
two-stage graded seepage filter and embankment 
toe drain, replacing the gatehouse bridge, wetland 
replication, repurposing the existing water supply pipe 
as a low-level outlet, pipe improvements including 
spray applied epoxy lining, new ductile iron pipe, a new 
stilling basin and downstream channel improvements, 
and new gate valves in the gatehouse.
Moakley Park Resiliency Improvements, Boston, 
Massachusetts. Leading the geotechnical design 
of Moakley Park’s climate resilience and flooding 
improvements. Moakley Park, a 60-acre waterfront park 
in South Boston, is prone to flooding with subsurface 
conditions consisting of very soft clays to 200 feet 
deep. Design includes up to 20-foot-high berms 
along the waterfront to function as levees, which will 
cross over existing, large-diameter, brick stormwater 
utilities. Currently working on optimal placement and 
preliminary design of the new levee system. 
Langone Park and Puopolo Playground Resiliency 
Improvements, Boston, Massachusetts. Led the 
geotechnical design of the approximately 4.6-acre 
waterfront park in Boston’s North End neighborhood. 
The design included raising site grades by up to 6.5 
feet while managing settlement in existing adjacent 
structures, including the 15-foot-high seawall and 
buildings.
Mill Brook Corridor and Wellington Park, 
Arlington, Massachusetts. Provided geotechnical 
engineering support for this flood conditions 
improvement project. Evaluated/studied the conditions 
of the park soils and Mill Brook’s banks. Following 
a team approach on alternatives analyses, led the 
geotechnical portion of the project solution.
North River Canal, Riverwalk, and Park, 
Peabody, Massachusetts. Geotechnical lead for the 
rehabilitation of the approximately 1,600-foot-long wall 
along the southern bank of the North River Canal in the 
urban industrial section of downtown Peabody. During 
the first phase of the project conducted a wall repair 
alternatives analysis to evaluate options to replace 
the failing canal wall, portions of which are crumbling 
into the river. The wall condition varied over its length, 
ranging from “good,” which needs minor or no repairs, 
to “poor,” requiring full or partial reconstruction. 
During the second phase, advanced the design of the 
preferred wall alternative and Riverwalk.
City of Boston Public Works Department Climate 
Resilient Design Standards and Guidelines. 
Prepared geotechnical resiliency guidelines as part of 
the Climate Ready Boston initiative to prepare for 40 
inches of sea level rise by 2070. Provided geotechnical 
considerations for design of vegetative berms, raised 
harbor walks, and raised roadway flood barriers, 
including considerations for incremental future sea 
level rise. 
MWRA Water Sections 50 & 57 and Sewer 
Sections 19, 20, and 21 Rehabilitation, Medford 
and Malden, Massachusetts. Lead geotechnical 
engineer for the rehabilitation of 20,000 linear feet of 
MWRA water main and 11,000 linear feet of MWRA 
sewer main in Medford and Malden, Massachusetts. 
Work includes drilling in urban environments replete 
with existing subsurface utilities and providing 
geotechnical recommendations for proposed trenches 
and access pits, including considerations for existing 
utility movements during construction. Supervising the 
geotechnical project manager’s work and reviewing 
project documents.
Tulin Fuselier's Key Project Experience Cont.

Page 609

westonandsampson.com
Bartlem Park South Design Documents, Cheshire, 
Connecticut. Following master plan development, 
responsible for providing geotechnical engineering support 
for the completion of Bid Documents for Phase 1 of this 
phased $14,870,000 master plan to renovate and enhance 
Bartlem Park. The master plan outlined a range of active and 
passive recreational improvements, and Phase 1 designs 
consist of a Great Lawn with a bandshell, paved walkways, a 
multi-purpose sports field, and additional parking.
New Athletic Fields and Playgrounds at Industrial 
Drive and Dawson Recreation Area Properties, Holden, 
Massachusetts. Geotechnical engineer responsible for 
supporting the design and construction of new athletic 
fields, improved playground amenities, enhanced site 
access, walking paths, and ancillary facilities as part of the 
phased approach at the two properties. The Industrial Drive 
property includes the design of two synthetic turf fields and 
the Dawson Recreation Area property has a synthetic turf 
baseball field.
McMackin Field Improvements, Revere, 
Massachusetts. Served as the lead geotechnical engineer 
for the proposed improvements to the park which included 
placement of 10 feet of fill below the proposed athletic 
fields above compressible soils. Coordinated subsurface 
explorations and prepared geotechnical engineering 
report with recommendations for fill placement, settlement 
monitoring; and geotechnical design parameters for 
proposed retaining walls, field lighting, scoreboard, and 
maintenance structures. Reviewed contractor submittals 
during construction. 
Key Project Experience
Jennifer MacGregor
PE
Geotechnical
31 Years of Experience | 5 Years with the Firm
Jennifer has extensive experience coordinating geotechnical 
exploration programs and providing geotechnical design 
recommendations for buildings, bridges, retaining structures, 
tunnels, dams, and levees for public and private clients. She 
has expertise in planning and coordinating geotechnical site 
exploration and testing programs; developing design criteria 
and construction recommendations for deep and shallow 
foundations systems, ground improvement, and temporary 
or permanent excavation support systems; evaluation of 
slope stability; and excavated soil management.
Title
Technical Leader
Office Location
Reading, MA
Education
1996, Master of Civil Engineering 
University of Massachusetts, 
Amherst
1994, Bachelor of Civil 
Engineering 
University of Massachusetts, 
Amherst
Registrations/Certifications
Professional Engineer:
NY No. 084596-1
ME No. 13695
MA No. 45230
CT No. PEN.0025402
RH No. PE.0008580
NH No. 14541

Page 610

westonandsampson.com
Malcolm X Park, Boston Parks and Recreation 
Department, Boston, Massachusetts. Served as the 
geotechnical engineer for the proposed improvements 
to the park which included upgrades to the playground, 
athletic courts, and fields; replacement of retaining 
walls; and grading changes for improved accessibility. 
Geotechnical consideration included up to 10 feet of 
fill below the athletic courts and fields, which impacted 
design of the associated lights and score board; and 
exposed bedrock within the proposed playground. 
Proposed Dock at LoPresti Park, Boston Parks 
and Recreation Department, East Boston, 
Massachusetts. A floating dock, secured by piles, is 
proposed adjacent to the existing pier at LoPresti Park. 
Advanced borings from a barge within the footprint of 
the proposed dock to provide subsurface information 
for design of the piles. Pile design was controlled by 
the lateral forces imposed by the ocean. Provided 
geotechnical design parameters for pile design to resist 
vertical and lateral loads. Design also incorporated 
considerations for sea level rise and site resiliency. 
Renovations to McConnell Park, Boston Parks & 
Recreation Department, Boston, Massachusetts. 
Provided geotechnical engineering for renovations 
to this open space resource in the Savin Hill 
neighborhood of Dorchester. Park improvements 
involved renovations to an existing ballpark including 
the synthetic turf Challenger Field and two natural 
grass ball fields. The site was within a 100-year flood 
plain and was being utilized for coastal resilience. The 
effort entailed complex grading, drainage, and site 
layout to meet the goals of the city.
Redevelopment of Ryan Playground, Boston 
Parks and Recreation (BPRD), Boston, 
Massachusetts. Provided geotechnical engineering 
for the redevelopment of Ryan Playground, located 
on a post-industrial, waterfront site. Efforts to realize 
the new, resilient park include ground improvements, 
sea wall modifications, Harborwalk renovation, and a 
reconfigured site that makes best and highest use of 
the available land to fend of rising tides.
Mary Dennison Park, Framingham, 
Massachusetts. Provided geotechnical engineering 
for the design of a recreational complex on a former 
brownfield property. Project challenges included a 
complex grading strategy that incorporated a new cap 
over the contaminated soil. 
Improvements to Louise Levingston Cove, 
Newton, Massachusetts. Provided geotechnical 
engineering for development of improvements to this 
community park amenity. Work included the design 
of a cantilevered deck overlooking Crystal Lake, an 
on-grade deck at the shoreline, and slope stabilization 
strategies.
Prescott Park Phase 1 Improvements, 
Portsmouth, New Hampshire. Providing 
geotechnical engineering for the enabling engineering 
phase of work following the approval of the Prescott 
Park Master Plan. Currently the project manager for the 
Phase 1 improvement scope. Work includes managing 
a multidisciplinary team of architects and engineers 
and developing a research-based approach to 
resiliency design that can improve flooding conditions 
for the neighborhood in the future.
Transfer Station Improvements, Winchester, 
Massachusetts. Geotechnical engineer during 
design and construction of upgrades to the Town of 
Winchester transfer station facility. The project will 
include partial demolition of the former incinerator 
building, in-situ ground improvement of fill material, 
permanent sheet pile retaining walls, re-configure 
facility layout to improve traffic flow and facilitate 
waste drop-off. Prepared geotechnical engineering 
recommendations report; and assisted with preparation 
of contact specifications and drawings.
Phase I Dam Inspections and Evaluations, 
Various Towns, Massachusetts. Engineer of Record 
for several Phase I dam inspections. Inspections 
were conducted in accordance with Department of 
Conservation and Recreation Office of Dam Safety 
guidelines and included reviews of existing information, 
visual observations, qualitative hydrologic, hydraulic, 
and geotechnical analyses, identification of dam safety 
deficiencies, and recommendations for repair and 
associated estimated costs.
Stream Channel Improvements to Entry 
Dingle Brook at Tiffany Street, Springfield, 
Massachusetts. Provided geotechnical services 
for the hydraulic analysis of the Entry Dingle Brook 
culvert and channel to prevent slope failure of stream 
embankments and provide a stable stream channel. 
Utilized HEC-RAS for the hydraulic model and FHWA 
HEC-11 computational methods for stream bank 
erosion and countermeasure design.
Jennifer MacGregor's Key Project Experience Cont.

Page 611

westonandsampson.com
Weir Village Riverfront Park (former FB Rogers site), 
Taunton, Massachusetts. Structural engineer responsible 
for working with Weston & Sampson’s in-house team to 
fully integrate the design of Weir Riverfront Park with the site 
cleanup strategy for the former FB Rogers site. The new park 
sits on the edge of the Taunton River, adding to the city’s 
open space system.
Improvements to Louise Levingston Cove, Newton, 
Massachusetts. Structural engineer responsible for 
supporting the development of the preferred plan, as well as 
design development and bidding. Work includes the design 
of a cantilevered deck overlooking Crystal Lake, an on-
grade deck at the shoreline, stormwater management, slope 
stabilization strategies, pathway upgrades, and planting 
areas.
New High School Athletic Facility Design & 
Construction, Danvers, Massachusetts. Provided 
structural engineering support for the design and 
construction of a new state-of-the-art athletic complex at 
Danvers High School, including the primary synthetic turf 
field at the stadium, a competition-level track, bleachers for 
2,600 spectators, lighting systems, a scoreboard, baseball 
field and multi-purpose field, tennis courts, and other sports 
and site support facilities/features.
Route 1A Athletic Field Complex, Walpole, 
Massachusetts. Structural engineer for the planning, final 
design, and construction services for this 30-acre, multi-
sport and recreation complex. The new facility includes two 
full-size multi-sport synthetic turf fields; two full-size natural 
Key Project Experience
Nathan Seifert
PE, LEED AP®
Structural
31 Years of Experience | 11 Years with the Firm
Nathan brings extensive engineering and construction 
experience. His areas of expertise include reinforced 
concrete, masonry, structural steel, and timber design, 
and he is well versed in the International Building Code. 
His portfolio includes design of new construction and 
renovation of commercial, multi-unit residential institutional 
and pharmaceutical/industrial buildings; water/wastewater 
treatment facilities; and bridges.
Title
Practice Leader
Office Location
Foxborough, MA
Education
1994, Bachelor of Science
Civil Engineering
Worcester Polytechnic Institute
Registrations/Certifications
Professional Engineer: 
CT No. PEN.0029660 
FL No. 79595
SC No. 35047 
NC No. 048585 
NH No. 16201 
NJ No. 24GE05860700 
NY No. 108658 
ME No. PE17459 
MA No. 41693 
RI No. 7663 
VA No. 67465 
VT No. 018.0134531 
LEED AP®

Page 612

westonandsampson.com
turf soccer fields, overlayed with full-size baseball 
and softball fields; two basketball courts; a universally 
accessible playground; a support building; walking 
paths; parking; and supporting infrastructure.
Ireland Street over West Branch Bronson Brook, 
MassDOT, Chesterfield, Massachusetts. Provided 
structural engineering services for the replacement 
of an existing 56-foot single span, steel thru-girder 
bridge. Responsibilities included performing a bridge 
type study; developing conceptual bridge plans, 
evaluating bridge superstructure replacement options 
of prestressed concrete NEXT beams, steel girders 
with precast concrete deck panels, and steel girders 
with shop fabricated concrete decks; and analyzing 
existing abutments.
Water Street over Blackstone River Bridge, 
Millbury, Massachusetts. Responsible for structural 
design and construction administration for the 
bridge substructure and superstructure design for 
Mass Highway Department. The superstructure was 
constructed with prestressed concrete box beams. 
Consolidated Public Works Department 
Facility, Waterbury, Connecticut. Responsible 
for structural design and construction administration 
for a new 120,000-square-foot facility designed to 
house all public works operations (administration, 
shops, highway, parks, refuse) plus a central DPW 
vehicle maintenance shop, and separate shops for 
maintenance of fire department vehicles, and police 
department vehicles. The structure was a combination 
of new pre-engineered and conventional steel 
additions on an existing steel structure. Substantial 
structural modifications were performed on the existing 
building.
Municipal Services Facility, Andover, 
Massachusetts. Responsible for structural 
design and construction administration for a new 
60,000-square-foot public works facility with vehicle 
storage, vehicle maintenance, and administration 
areas. The structure was a one- and two-story pre-
engineered metal building.
DPW Facility Code, Safety, and Operational 
Improvements, Bloomfield, Connecticut. 
Responsible for structural design for the renovation 
of an existing 24,000-square-foot public works facility 
with vehicle storage, vehicle maintenance, and 
administration areas. The renovation included 11,000 
square feet of additions. The structure was a one-story 
conventional steel structure.
Highway Department Repair and Partial 
Replacement, Colrain, Massachusetts. 
Responsible for structural design and construction 
administration for the renovation of an existing 
4,500-square-foot highway department facility 
with vehicle storage, vehicle maintenance, and 
administration areas. The renovation included a 
2,000-square-foot addition. The structure was a 
combination of conventional steel, concrete masonry, 
and wood framing.
Department of Public Works Renovation & 
Addition, Arlington, Massachusetts. Engineer 
of Record responsible for structural design for 
the renovation of the historic public works facility 
and the design of a new vehicle maintenance and 
administration building. The project involves historic 
designation, on-site historic contamination, multiple 
end users, utility easements across the site, a brook 
running through the center of the site, and budgetary 
limitations.
Department of Public Works and Natural 
Resources Facility, Orleans, Massachusetts. 
Responsible for structural design and construction 
administration for a new 42,000-square-foot public 
works facility with vehicle storage, vehicle maintenance, 
and administration areas. The structure was a one-
story pre-engineered metal building.
New Public Works Facility, Hopkinton, 
Massachusetts. Responsible for structural 
design and construction administration for a new 
40,000-square-foot public works facility with vehicle 
storage, vehicle maintenance, and administration 
areas. Structure was a one- and two-story pre-
engineered metal building.
Mill Brook Corridor and Wellington Park, 
Arlington, Massachusetts. Responsible for 
the structural support of the revitalization of the 
linear corridor along Mill Brook and Wellington 
Park. Responsible for the structural design of a 
new boardwalk. The project also involved site 
improvements, vegetation management planning, and 
bank restoration.
Nathan Seifert's Key Project Experience Cont.

Page 613

2 Tunxis Road, Suite #214 • Tariffville, CT  06081 
Phone: (860) 408-9167 • Fax: (860) 408-9269 •  E-mail: brian.denno@gmail.com 
Denno Land Surveying is a full-service Land Surveying company located in the Tariffville 
section of Simsbury, CT.  Denno Land Surveying has been owned and operated by Brian 
Denno, L.S. since 2008, when he acquired the existing firm of Nascimbeni and Jahne Surveyors, 
P.C.
Brian Denno is a licensed Land Surveyor with a degree in Civil Engineering with over 39 years 
of experience in the industry.  Prior to establishing his own business, he was with a CT Land 
Surveying & Engineering firm for 24 years. 
Previous projects include: 
The layout and as-built locations of the column lines in terminal A of Bradley International 
Airport. 
The layout and as-built of the new safety building and associated parking at Bradley 
International Airport 2013-2014. 
The layout of the Building, column lines, utilities, pavement and as-built survey at Brainerd 
Airport’s new maintenance facility. 
The layout of over 5,000 VSC (vibratory stone column) and building and column lines for the 
Amazon building on Kennedy Road Windsor, CT - August 2020. 
Utility locations, topographic survey of the UPS site at Bradley International Airport. 
The layout of the new utilities, security fencing and airplane parking at Terminal B at Bradley 
International. 
Multiple Farmland Preservation Surveys for the CT Department of Agriculture from 40 acres to 
over 1,000 acres. 
Many improvement location surveys of commercial sites, utility surveys for water, sewer, gas 
and storm water facilities for both municipalities and private developers. 
Layout and as-builts of over 2 million square feet of warehouse and parking lots in E. Hartford, 
CT for Lowes and Wayfair – December 2024. 

Page 614

CERTIFICATIONS
_______________
• PROFESSIONAL SOIL SCIENTIST
• PROFESSIONAL WETLAND SCIENTIST
KEY SKILLS
_______________
• Qualified Herpetologist
• State & Federal Permitting
• Project Management
• Wetland Delineation
• DEEP NDDB Compliance
• Erosion & Sedimentation Control
Inspections & Compliance
• GIS Data Development
• Connecticut Siting Council Support
EDUCATION
_______________
BACHELOR OF SCIENCE IN 
WILDLIFE MANAGEMENT
1999 – University of Massachusetts, 
Amherst 
GRADUATE STUDIES, SOIL SCIENCE
2000 – New England Regional Soil Science 
Certificate Program
PROFILE
_______________
Eric Davison has been providing wetland and biological consulting services in Connecti-
cut since 1999. He is a Wildlife Biologist and DEEP recognized Herpetologist overseeing 
compliance with NDDB protection measures for State-listed amphibians and reptiles. 
His experience includes field surveys for amphibians, reptiles and birds, wetland de-
lineation, evaluation of wetland functions and values, preparation of wetland impact 
assessments and permitting documents. Eric also acts as the project manager oversee-
ing State-listed plant surveys conducted by Davison Environmental botanists.
KEY EVERSOURCE PROJECTS
_______________
VEGETATION MANAGEMENT PROGRAM, VARIOUS PROJECTS
Provided environmental compliance support for the vegetation maintenance program 
on over 30 projects since 2018.  Performed wetland delineation, vernal pool surveys, 
managed State-listed plant surveys, and implemented NDDB species protection 
measures, mitigation and monitoring plans for routine maintenance, TRRP and 
herbicide work.
STRUCTURE REPLACEMENT PROJECTS
Since 2016, performed wetland delineation and vernal pool surveys on 40 separate 
structure replacement projects. Work included field surveys, GIS mapping of regulated 
resources, and preparation of wetland delineation and vernal pool reports for inclusion 
in Siting Council Petitions. 
310-383 LINE
In support of a structure replacement project, oversaw surveys for State-listed
plant species and host plants for State-listed invertebrates. Surveys identified rare
species locations relative to work areas, developed mitigation plans for impact areas,
and conducted multi-year monitoring for rare species in compliance with NDDB
Determination conditions.
348-364 LINE
Performed wetland delineation, vernal pool surveys and oversaw surveys for State-
listed plant species and critical habitats in support of a structure replacement project.
Work included assisting with the development of habitat restoration plans and plant
mitigation plans, and conducted multi-year monitoring in compliance with NDDB
Determination conditions.
📞 (860) 803-0938 💻 www.davisonenvironmental.com
📧 eric@davisonenvironmental.com 📪 10 Maple Street, Chester, Connecticut 06412
ERIC DAVISON 
PROJECT MANAGER / SENIOR WETLAND SCIENTIST
18

Page 615

Relevant Experience 
 
The Weston & Sampson family of companies is 
actively engaged with all phases of public 
improvement projects. Our engineering /design 
company completes study, planning, design, 
permitting and construction administration for 
infrastructure projects; our construction / 
maintenance and repair company actively 
assists communities in the construction and 
repair of projects; and our operations company 
assists municipalities in operating the 
constructed projects.   
On the following pages, we have provided 
project descriptions of similar projects that 
demonstrate our firm’s ability to perform and 
complete the work described in ‘Description of 
Services Needed’, as described in the RFP. 
Each project includes a client reference whom 
we invite you to contact to learn more about our 
capabilities and past performance. 
 
 
 
 
 
\\wse03.local\WSInc\Marketing\_MarketingReso
ll Tables\Map 
Project Highlight: Athletic Field, Watervliet, NY 

Page 616

FULL-SERVICE PARKS, SPORTS, AND RECREATION FACILITY SPECIALISTS
SPORTS & RECREATION

Page 617

*Member of American Sports Build Association and Sports Field Management Association
For more information, contact:
info@westonandsampson.com I 800.SAMPSON I westonandsampson.com
There are few project sites that are alike, and every project proponent has needs that 
are unique. Accomplishing projects can be complicated and challenging as communities and owners 
grapple with a host of questions:
 ■ Do we renovate or fully reconstruct our facility? 
 ■ Do we need additional facilities? 
 ■ Will we be able to maintain and operate this  
facility? 
 ■ Should we construct natural turf fields, synthetic  
turf fields, or a combination? 
 ■ Is synthetic turf safe for our users and the 
environment? 
 ■ How can we meet our watering/irrigation needs? 
 ■ Would facility lighting pose any challenges or 
implications?
 ■ What can we afford? 
Weston & Sampson can collaborate with you to answer these questions and establish the most appropriate 
strategy. To support our work and achieve exceptional project results, we maintain a team of skilled sports 
and recreation facility designers, landscape architects, engineers, and environmental scientists. Our multi-
disciplinary support team assists us in delivering smart, sustainable, and technically sound solutions to the 
structural, geotechnical, lighting/electrical, environmental, and stormwater management aspects of every 
assignment during every stage of project development from feasibility to construction.
SPORTS AND RECREATION FACILITIES 
THAT STAND UP TO THE COMPETITION

Page 618

Page 619

FIELDS
Natural and synthetic turf fields, stadium and bleacher systems, fieldhouses, restroom 
facilities, sports lighting, and a wide range of ancillary amenities 
Our field projects are located within school campuses, standalone athletic complexes, historic parks, 
neighborhood playgrounds, and other types of public and private properties. Weston & Sampson designs 
new fields as well as renovations to existing fields to fit within the context of their surroundings and to meet 
the needs of user groups and owners. 

Page 620

COURTS
New construction, re-construction, and renovation of tennis, pickleball, basketball, 
handball, volleyball, roller/street hockey, and shared-use courts 
Weston & Sampson’s court designs also include the refurbishment and replacement of integral sports 
equipment and infrastructure such as sports lighting, storm drainage, perimeter court treatments, players’ 
benches, and related site furnishings. Our professionals can also help you select the appropriate surface 
type (e.g., hard court, clay (for tennis courts), or post-tension concrete).

Page 621

TRACKS
Running tracks that support the highest level of competition, as well as walking,  
fitness, and multi-use trails 
Since many communities only offer one track facility, our team designs these amenities to accommodate 
informal, residential use and community/social gathering in addition to organized, competitive events. We 
help each project proponent determine the most appropriate track surface types and the extent of the facility’s 
ancillary systems and infrastructure.

Page 622

westonandsampson.com
PROJECT SHEETS\Landscape Architecture\Sports and Recreation\CT_North Haven Various Athletic Facility 
Various Athletic Facility 
Improvement Projects
north haven, connecticut  
Weston & Sampson has provided landscape architecture, engineering, 
and construction phase services to the Town of North Haven for several 
key athletic facility projects, including the Vanacore Running Track, 
Comprehensive Athletic Facility Master Plan, Turf Field Grandstand, and 
DeMayo Baseball and Brozek Softball Diamond Field improvements. 
Our work has included the following: 
• In coordination with town leadership, the Department of Public 
Works, Board of Education, and other stakeholders, Weston & 
Sampson developed a Comprehensive Athletic Facility Master 
Plan, identifying priority improvements and associated costs.
• For the Vanacore Running Track project at the North Haven 
Middle School, our landscape architects and engineers 
addressed grading and surfacing deficiencies to meet American 
Sports Builders Association (ASBA) standards. The $2 million 
reconstruction included a new track, upgraded field events, LED 
sports lighting, ADA-accessible walkways, a new scoreboard, and 
reconstruction of the irrigated grass football field.
• Our landscape architecture and civil engineering teams collaborated 
to complete the Turf Field Grandstand improvement project, which 
added a 1,000-person grandstand with a press box at the existing 
turf fields.
• For the DeMayo Baseball and Brozek Softball Diamond 
Field Improvements, Weston & Sampson prepared design and 
bidding documents for the full renovation of the varsity baseball and 
softball diamond fields, including relocation of the baseball field, 
field upgrades, irrigation improvements, new LED sports lighting, 
scoreboards, precast dugouts, bullpens, and fencing.
Client Contact
Lynn Sadosky, PE
Director of Public Works
203-672-8363
sadosky.lynn@northhaven-ct.gov

Page 623

westonandsampson.com

Page 624

westonandsampson.com
PROJECT SHEETS\Landscape Architecture\Master Plans\CT_Cheshire Bartlem Park
Project Highlights
• high-level athletic field 
• input from various sports 
groups in town
• public engagement
• town recreation resource 
review
• programming & schematic 
designs
• alternatives analysis
• final park design
Athletic Fields, Bartlem Park 
South Master Plan
cheshire, connecticut
The Town of Cheshire selected Weston & Sampson to develop a master 
plan for a 10-acre addition to Bartlem Park, a 65-acre community hub. 
The master planning effort for the area known as Bartlem Park South 
included an inventory of current assets and an analysis of future needs 
and implementation strategies.
Weston & Sampson engaged the community through various methods, 
including a park planning display at an outdoor event, an online survey, 
and multiple public meetings with stakeholders. This input helped 
shape a programming plan and schematic designs.
The proposed features for the expanded park included soccer and 
lacrosse fields, 90-foot baseball diamond, restrooms, pavilion, 
gathering spaces, parking areas, community pool, splash pad, nature-
based playground, skate park, picnic area, community gardens, trail 
systems, and stormwater management facilities. The full buildout is 
estimated to cost $14 million, with $7.9 million already authorized for 
Phase I.
Client Contact
John Gawlak, CPRP
Director Parks & Recreation
475-343-2832 (mobile)
203-272-2743 (office)
jgawlak@cheshirect.org

Page 625

westonandsampson.com

Page 626

westonandsampson.com
PROJECT SHEETS\Landscape Architecture\Sports and Recreation\MA_Mansfield High School Track + Field 
Mansfield High School Track 
& Field Facility Renovation
mansfield, massachusetts
Weston & Sampson was selected by Mansfield Public Schools to 
complete renovations and upgrades to the exisiting track and field 
facilities at the town’s high school. This project was an accumulation of 
the assessment and recommendations for the site evaluation submitted 
prior to this construction project. The goal was to renovate and upgrade 
the existing track and field facilities through design, permitting, and 
construction.
Key features of the project included a full-depth replacement of 
synthetic turf athletic field with subsurface drainage systems, as well as 
reconstruction of resilient running track surface. Upgrades to existing 
athletic field lighting and scoreboard were also made. Improvements 
also included ADA accessibility to the facility and amenities within the 
facility and perimeter fencing and spectator seating areas. Additional 
improvements included replacement of the scoreboard and expansion 
of the spectator seating areas (bleachers).
Client Contact
Edward S. Donoghue
Assistant Superintendent for 
Finance & Operations
Mansfield Public Schools, MA
508-261-7506
edward.donoghue@
mansfieldschools.com

Page 627

westonandsampson.com

Page 628

westonandsampson.com
PROJECT SHEETS\Landscape Architecture\Sports and Recreation\NY_Watervliet New Track + Field
Project Highlights
• synthetic turf field & track 
design
• elevated bleachers & 
pedestrian footbridge
• sports lighting
• construction administration
• cost estimating
• drainage
Junior/Senior High School  
Synthetic Turf Athletic Field & 
Running Track
watervliet, new york
As part of the Watervliet City School District’s facilities improvements 
project, Weston & Sampson provided engineering design and 
coordination, landscape architecture, and athletic facility design 
services for the athletic field and athletic stadium at Watervliet Junior/
Senior High School. The new facility includes:
• Six-lane running track with an eight-lane straightaway, inclusive of all 
events
• Multi-purpose synthetic turf field to accommodate football, lacrosse, 
& soccer sporting events
• Elevated bleacher system with precast engineered pedestrian 
footbridge that extends from the school to the home field bleachers
• Concrete retaining wall 
• Sports lighting to allow for evening events
• Design elements to facilitate field drainage
Client Contact
Dr. Lori Caplan 
Superintendent of Schools  
518-629-3200 x6
“
I am writing to thank and praise everyone involved with 
the Watervliet project. Needless to say, we are blown away 
with how it came out...In my opinion, our facilities are the 
best around, hands down. Between the new gymnasium 
sitting above the patron plaza below, overlooking the 
gorgeous field and track, I can’t imagine any other school 
having such a beautiful setup!”
- Michael Foust, Director of Athletics, Jr/Sr High Assistant 
Principal, Watervliet City School District

Page 629

westonandsampson.com

Page 630

westonandsampson.com

Page 631

westonandsampson.com
PROJECT SHEETS\Water\Comprehensive\CT_Aquarion Water Company OnCall Engineering Consulting
Over the past two decades, Weston & Sampson has 
performed more than 100 assignments for Aquarion Water 
Company under on-call assignments and other project 
engagements. Task orders and direct assignments have 
included a wide range of utility, treatment plant, and 
pumping station services.
“
In just a year’s time, Weston & Sampson has performed 
10 Task Order assignments for Aquarion Water Company 
under an on-call contract. Their staff has provided us with 
high-quality engineer¬ing services on a timely basis… 
Aquarion Water Company strives to pro¬vide cost-efficient, 
quality, and responsive services for our capital program, 
and Weston & Sampson’s staff has worked with us to meet 
these goals.”
- Daniel Lawrence, PE, Director of Engineering & Planning, 
Aquarion Water Company
Project Highlights
• design of pumping/ 
booster stations
• design of water main 
replacements & extensions
• site planning/design of new 
facilities
• storage tank and pumping 
facilities 
• construction inspection of 
pumping stations
• structural evaluation of 
process tankage
• mechanical & HVAC 
design
• emergency wastewater 
treatment plant operations
• construction services
• backflow inspections
• coatings & hazardous 
building materials 
assessment
• equipment repair
• operations assistance
On-Call Engineering 
Consulting Services
aquarion water company | connecticut
Chestnut Tree Hill Pumping Station, Oxford: Engaged in 2017 
for the design of a new pumping station facility, Weston & Sampson 
designed a new below-grade precast concrete chamber that housed 
the controls, instrumentation, and electrical systems for a duplex 
booster station on a site in proximity to neighboring homes. The 
station incorporated a high level of customization that established 
the standard of construction for similar stations in Aquarion’s system. 
Our engineering design team worked closely with the operations staff 
to provide the necessary controls, mechanical systems, and facility 
configuration desired, resulting in a new state-of-the-art facility that 
went online seamlessly and without notice to the users of the system. 
Client Contact
Daniel Lawrence, PE
Director of Engineering & 
Planning 
203-362-3055
dlawrence@aquarionwater.com

Page 632

westonandsampson.com
Treatment Tank Inspections and Rehabilitation, Easton: In 
2019, Weston & Sampson was selected to develop a report that 
documented existing conditions and recommended improvements, 
including the complete replacement, of the existing Settler and 
Flocculation Basin at one of Aquarion’s treatment facilities. 
Observations were provided by a multi-disciplined team of engineers 
who performed on-site structural and architectural inspections. 
Following the documentation, the team developed construction 
drawings and technical specifications portraying the recommended 
structural, mechanical, process and electrical repairs and/or 
rehabilitation for the structures.
Putnam WTP Retention Basin Rehabilitation, Greenwich: In 
2019, Weston & Sampson was selected to develop an alternative 
analysis report to determine the best way to rehabilitate or replace 
the existing soldier pile wall along the east side of the retention basin. 
Based on the alternative analysis report, we prepared modular wall 
construction documents for the rehabilitation. Provided construction 
services for the project as well including review of all submittal, 
payment applications and full-time on-site construction inspections. 
WTP Treatment Tank Inspections and Rehabilitation, Easton: In 
2019, Weston & Sampson was selected to develop plans to address 
various capital improvements to the existing Easton Water Treatment 
Plant (WTP). The improvements included various structural repairs 
and upgrades at the contact tank effluent vault, flocculation and 
settling basins, operation building, electrical vaults, venturi chamber, 
sludge room, and site walkways. The project required both analysis 
of existing structures in the areas noted and design of new framing 
structures. Our team provided structural construction services which 
included the review of submittals and shop drawings, payment 
applications and full-time on-site construction inspection.

Page 633

westonandsampson.com
PROJECT SHEETS\Water\Comprehensive\CT_CT Water OnCall Engineering Services
On-Call Engineering Services
connecticut water company | connecticut
Weston & Sampson has assisted the Heritage Village water and 
wastewater utility providers since 1999, through its earlier owner (Heritage 
Village Water Company) and its current owner, Connecticut Water Service, 
Inc. Our team has been providing subsidiary, Connecticut Water Company, 
with full service multi-discipline consulting engineering services related 
to water supply and distribution system improvements throughout the 
state, including water mains, water booster stations, water storage tanks, 
chemical treatment systems, and water supply planning and permitting. 
Representative Projects – Past 10 Years:
• 2016 HV WWTP Easement Mapping
• 2016 HV WWTP PS Easement Mapping – Poverty Road PS
• 2018 Heritage Village Lift Station #1 Replacement
• 2019 HV WWTP Clarifier Walkway Design
• 2019 HV WWTP Operations Assistance – Owner’s Project Manager
• 2019 HV WWTP Clarifier Rake Assembly Repair
• 2020 Heritage Village Lift Stations 7 & 8 Pump Replacements
• 2020 Heritage Village Lift Stations 7 & 8 Pump Base Replacements
• 2020 HV WWTP Operations Assistance Services 
• 2020 HV WWTP Clarifier Walkway Installation
• 2020 HV WWTP Aeration System DO Meter System Design / Install
• 2020 Heritage Village Lift Stations 7 & 8 Bypass Connection Install
• 2020 Heritage Village Hillhouse Road Sewer Realignment 
Evaluation/Design
• 2022 Heritage Village Manhole Rehabilitation Project
• 2023 Lift Stations 2, 3 & 4 consolidation Project
• 2024 Emergency Sewer Repair
• 2025 Heritage Village WWTP Upgrade: UV Conversion
• Southbury Church Road Booster PS
Client Contact
Dave Peeling
Vice President of Engineering 
860 664-6007 
dpeeling@CTWater.com
 
Don Schumacher
Superintendent of Operations
860 664-6067 
DSchumacher@CTWater.com
Start Date: 1999
End Date: Ongoing 
Cost: varies (multiple projects)

Page 634

westonandsampson.com
Water Distribution System, Thompson, Connecticut: Weston 
& Sampson provided design services to support the installation of 
a replacement 12-inch diameter water main at the underside of the 
Main Street Bridge over the French River. We provided construction 
documents for the installation of the proposed water main and 
attachment of pipe supports to the existing framing of Bridge No. 
04458. 
The existing 8-inch water main crossed under the French River to 
the north of the existing town-owned bridge. Project goals included 
replacing the existing water main with a new 12-inch diameter 
ductile iron pre-insulated water main. The design consisted of 
spanning the river, underneath the bridge deck, between existing 
structural steel members, along the northern side of the bridge. The 
water main penetrated the existing abutments and connected to 
water main on either side of the bridge.
Our team performed Load Rating Analysis of the existing bridge 
superstructure to carry the anticipated new insulated 12-inch water 
main, water main support system and appurtenances for the water 
main. The analysis was reviewed and approved by Connecticut 
Department of Transportation (CTDOT).
Church Road Water Booster Pump Station, Southbury, 
Connecticut: Weston & Sampson provided design and bid phase 
services for a replacement water booster station on Church Road. 
The station was designed for a pumping capacity not less than 
1,500 GPM using three equally sized pumps. One pump handles 
average flows, the second pump handles peak flows, and the third 
pump provides redundancy. Internal piping included a bypass 
and PRV with pressure relief to feed bi-directionally through the 
station. We provided geotechnical engineering, site/civil, permitting, 
architectural, structural, electrical and HVAC design support. The 
project also included performing a hazardous building materials 
survey to support the demolition of the existing 1970s era pumping 
station.

Page 635

westonandsampson.com
PROJECT SHEETS\Transportation\Road\CT_Branford Main Street Reconstruction
Project Highlights
• roadway & drainage 
designs
• complete streets
• utility improvements
• stormwater management 
& LID
• safety improvements
• public engagement plan
• state grant funding
Main Street Reconstruction
branford, connecticut
The Town of Branford selected Weston & Sampson to design the 
reconstruction of 2,000 feet of Main Street, an urban collector downtown 
roadway that is a main corridor with commercial activity. The Main 
Street area is located within a five-minute walk of the transit-oriented 
development (TOD) district; it also abuts Town Hall and a community 
park, and encompasses an historic town green and trolley route. 
Our design efforts considered multi-modal transportation, including 
buses, cars, bicycles, and pedestrians, and involved repurposing 
the remnant trolley tracks into the landscape. Our team designed 
improvements to roadways and intersections that would increase 
safety, accessibility, and mobility while incorporating Complete Streets 
methodologies and traffic calming measures. Our work included 
examining ways to enhance traffic and pedestrian circulation and parking 
interconnectivity, with improved side street and off-street parking options.
Project improvements will provide for better traffic flow, safer pedestrian 
zones (i.e., sidewalks and crosswalks), drainage improvements, low 
impact development (LID), and an aesthetically enhanced streetscape. 
As the project progressed, the scope of our efforts morphed into 
a full-scale downtown revitalization project. Our team provided 
wholesale improvements that included placemaking, ADA accessibility 
enhancements, green infrastructure, street tree plantings, pedestrian 
lighting and furnishings, paver sidewalks, and granite curbing to fit 
within the context of a lively mixed-use environment downtown area 
serving as the heart of the Branford community. Our efforts also 
involved developing a public engagement plan that included public 
and stakeholder meetings, virtual engagement, a virtual survey, social 
media, and website postings. Final designs include three different Tree 
Filter designs, raingardens, and tree plantings to manage stormwater, 
improve the urban tree canopy, and lower the urban heat index.
In addition to our initial designs, Weston & Sampson will provide 
design services during construction and construction engineering and 
inspection (CE&I) services. This reconstruction and revitalization project 
also received funding through CTDOT’s Local Transportation Capital 
Improvement Program (LOTCIP).
Client Contact
John Hoefferle
Town Engineer
203-315-0606
engineering@branford-ct.gov

Page 636

westonandsampson.com

Page 637

westonandsampson.com
PROJECT SHEETS\Landscape Architecture\Playgrounds and Recreation\CT_Bristol Page Park Renovation
Project Highlights
• lighted post-tension 
concrete pickleball, tennis, 
& basketball courts 
• lighted synthetic turf 
baseball/multi-purpose 
overlay field
• range of recreational 
amenities & improvements
• utility & parking 
improvements
Page Park
bristol, connecticut
Weston & Sampson provided large-scale planning, design, 
engineering, and permitting services for the renovation of Page 
Park. The existing 80-acre park includes a network of vehicular, 
pedestrian, and bicycle circulation paths; parking; water courses; a 
pond supported by a dam; a disc course; sledding hills; a pavilion; 
a pool and bath house; racquet and basketball courts; and an active 
recreation diamond and rectangular fields. Weston & Sampson guided 
the city through a $15M list of desired improvements towards a creative, 
realistic, and sustainable solution that is phased in a logical, fiscally 
responsible manner.
Recognizing the significance of this project to the city, Weston & 
Sampson facilitated the preliminary design process and sought ways to 
improve the interstitial relationship between the proposed site features. 
We finessed the design to reduce “leftover” areas of grass that are 
unusable and difficult to maintain. By reconfiguring this area, we were 
able to preserve the park’s beloved sledding hill. Weston & Sampson 
provided geotechnical, stormwater, and utility infrastructure engineering 
services to determine the best use and appropriate construction 
methods for the lighted post-tension concrete pickleball, tennis, and 
basketball courts.
Project objectives included achieving:
• Renovation of and updates to existing amenities and facilities, 
including four lighted post-tension concrete pickleball courts, a 
lighted synthetic turf baseball/multi-purpose overlay field and 
appurtenances, Ingraham Softball Field and appurtenances, a 
sledding hill, two picnic shelters, and an outdoor fitness station
• Enhanced walkability within the park
• Enhanced parking availability at the turf field, playground, courts 
area, pool, pavilion, disc golf area, and Ingraham Softball Field
• Installation of sewer connection and parking necessary for 
improvements at the Page Park Pavilion
Client Contact
Joshua Medeiros, EdD, CPRE
Superintendent of Parks, 
Recreation, Youth & 
Community Services
860-693-5808 / 860-584-6160
joshmedeiros@bristolct.gov

Page 638

westonandsampson.com

Page 639

westonandsampson.com
PROJECT SHEETS\Landscape Architecture\Playgrounds and Recreation\MA_BPRD Dorchester Harambee 
Project Highlights
• master plan & multi-
phased park design /
construction
• public participation / 
community outreach
• accessible playgrounds
• athletic field & 
park infrastructure 
improvements
• circulation & lighting 
analysis & improvements
• active & passive 
recreational amenities
• trees additions & 
landscape enhancements
Harambee Park
bprd | dorchester, massachusetts
Weston & Sampson’s efforts at Harambee Park, one of Boston Parks and 
Recreation Department’s largest open space assets, includes providing 
master planning and phased design implementation services. 
• Phase I included a universally accessible landform play area with 
a bridge and tower structure, embankment slides, climbing nets, 
splash pad water features, and swings. Other amenities include two 
new basketball courts with LED lighting, a workout area, seating, and 
lighting on pedestrian pathways. 
• Phase II included two new, multi-use rectangular fields with irrigation 
and spectator seating, an informal amphitheater and stage area, and 
an interior walking loop to accommodate multi-generational use. A 
critical project element involved improving stormwater management 
due to existing topography and an emergency overflow outfall 
structure managed by the Boston Water and Sewer Commission. 
• Phase III included two new football fields with bleachers, a 
cheerleading practice area, workout nodes, lighted pathways, parking, 
and stormwater management. 
• Phase IV involves the design and construction of cricket fields, 
pathway improvements, 41 new trees, field and path lighting, and 
other site improvements.
Client Contact
Cathy Baker-Eclipse
Interim Commissioner
Boston Parks and Recreation 
Department 
617-961-3058
cathy.baker-eclipse@boston.gov

Page 640

westonandsampson.com

Page 641

westonandsampson.com
PROJECT SHEETS\On Call\MA_Framingham On-Call
On-Call Engineering Services 
framingham, massachusetts 
Weston & Sampson provided on-call engineering assistance to the 
Framingham Public Works and Engineering Departments for a wide 
range of infrastructure improvement projects. We provided multi-
disciplinary services that encompassed the design, permitting, public 
information, construction administration, and site inspection phases of 
project development. Through our on-call services agreement, we have 
provided the following services:
• Town-wide bridge inspections
• Bridge / culvert design & construction oversight
• Roadway / sidewalk design & construction
• ADA enhancements
• Utility systems design & construction
• Inspection services for DPW designed projects
• Streetscape improvements along public corridors
• Public hearing presentations & coordination
Client Contact
William Sedewitz, PE
Senior Project Manager
Framingham DPW
508-532-6012
wrs@framinghamma.gov

Page 642

westonandsampson.com
Our work has required proactive communication and coordination with a variety of public and private 
entities including the Planning Board, Conservation Commission, Parks and Recreation Department, 
Housing Authority, Historical Commission, and Framingham State College. Specific projects 
included:
• Full-depth reconstruction of State Street, a scenic by-way that passes through the heart of the 
Framingham State College campus.
• Refurbishment of a major granite block culvert below Maple Street.
• Replacement of utility systems below the Pearl Harbor Road housing development off of Concord 
Street.
• Construction of new surface parking areas at the town’s public works complex.

Page 643

References           
 
To assist in your evaluation of Weston & 
Sampson, we offer contact information for 
some of our current and long-standing clients 
for whom we have provided similar services. 
These references can attest to qualifications, 
work history, and responsiveness. We 
recognize the importance of providing 
responsive service and commit our resources 
to ensure all project goals and deadlines are 
achieved. We invite you to contact these 
individuals to discuss our firm’s overall 
capabilities and past performance. 
 
John Gawlak, CPRP  
Town of Cheshire, CT 
Director Parks & Recreation 
475-343-2832 (mobile) 
203-272-2743 (office) 
jgawlak@cheshirect.org 
Project: Bartlem Park 
 
Weston & Sampson developed a master plan for a 10-acre 
addition to Bartlem Park, a 65-acre community hub. The master 
planning effort for the area included an inventory of current 
assets and an analysis of future needs and implementation 
strategies. We engaged the community through various 
methods, including a park planning display at an outdoor event, 
an online survey, and multiple public meetings with 
stakeholders. The proposed features for the expanded park 
include a community pool, splash pad, 90-foot baseball 
diamond, soccer and lacrosse fields, a nature-based 
playground, skate park, pavilion, picnic area, community 
gardens, gathering spaces, parking areas, trail systems, and 
stormwater management facilities. 
Joshua Medeiros, EdD, 
CPRE 
City of Bristol, CT  
Superintendent of Parks, Recreation, 
Youth & Community Services 
860-693-5808 / 860-584-6160 
joshmedeiros@bristolct.gov 
Project: Page Park 
 
Weston & Sampson provided comprehensive large-scale 
planning, design, engineering, and permitting services for Page 
Park, an 80-acre recreational facility. The existing park featured 
diverse amenities, including vehicular, pedestrian, and bicycle 
circulation paths; parking areas; watercourses; a pond with 
dam; disc course; sledding hills; pavilion; pool and bathhouse; 
racquet and basketball courts; and active recreation fields. Our 
firm guided the city through the improvement program, 
developing a creative, realistic, and sustainable solution. Key 
improvements included four lighted post-tension concrete 
pickleball courts, lighted synthetic turf baseball/multi-purpose 
overlay field, Ingraham Softball Field upgrades, enhanced 
sledding hill facilities, two picnic shelters, outdoor fitness 
station, and overall improved walkability and parking. 
Lynn Sadosky, PE  
Town of North Haven, CT  
Director of Public Works 
203-672-8363 
sadosky.lynn@northhaven-ct.gov    
Project: Various Athletic Field 
Improvements 
 
Weston & Sampson provided landscape architecture services 
for athletic field improvements in North Haven, including the 
development of a $7 million master plan for the North Haven 
Athletic Complex and the Vanacore Track Replacement at North 
Haven Middle School. The master plan incorporated baseball 
and softball field renovations, a new concession building, a new 
1,000-seat grandstand at the turf field, and tennis court 
renovations, with Phase 1 construction documents addressing 
$3.5 million in improvements. The Vanacore Track Replacement 
expanded the track from 6 to 8 lanes along the straightaway and 
included a new track surface, long jump and triple jump lanes 
and pits, pole vault and high jump areas, fencing, sports field 
lighting, a scoreboard, and concession and locker room 
access. The project also required significant grading and 
drainage improvements to address a 1.5-foot elevation change 
and bring the facility up to current standards. 

Page 644

Project Understanding 
 
Weston & Sampson is excited for this 
opportunity to provide our qualifications for 
professional design and engineering services 
for the Town of Granby as they plan several 
improvement projects over the next five years, 
including but not limited to the following: 
• Planning, design and construction of a 
replacement running track and adjacent 
baseball and softball fields at the high 
school and middle school complex 
• The construction of a year-round bathroom 
at Salmon Brook Park 
• The construction of pickleball courts at 
Salmon Brook Park  
• The assessment and administration of a 
sewer pump maintenance project 
• Other engineering tasks associated with 
capital infrastructure 
Weston & Sampson’s comprehensive team has 
been specifically assembled for these initiatives 
and includes designers, engineers, and 
technical experts with the in-house resources 
needed to support your projects. We are ready 
to bring our experience to develop solutions 
that are thoughtfully designed, practical, 
durable, and cost-effective to meet your needs. 
 
 
 
 

Page 645

Granby, CT | Professional Engineering Services 
 
 
Track & Diamond Field Project 
Approach 
The RFP outlines the planning, design, and 
construction of a replacement athletic/running 
track and adjacent baseball and softball fields 
at the high school/middle school complex. 
Our team has consciously chosen to focus their 
careers on the design of outstanding athletic 
facilities, municipal parks, and open space 
projects, bringing a great depth of knowledge 
and experience garnered from working within 
the public realm to every assignment. We 
recognize that this project is extremely 
important to the Town of Granby, and we are 
dedicated to bringing our energy, creativity, and 
technical prowess to all aspects of this project 
when developing your athletic facility complex.  
Having successfully managed and completed 
many large-scale projects of similar nature, we 
believe our technical skills and past 
experiences will allow us to exceed the specific 
needs of the district effectively and efficiently.  
Weston & Sampson has become a trusted 
partner for several communities in the 
implementation of projects because of our 
reputation for knowing how to get big ideas 
permitted and built. We have developed a 
simple formula that allows us to develop strong 
partnerships with our clients that ultimately yield 
strong project results.  
To this end, we pledge to: 
• be highly responsive, accountable, and 
communicative 
• listen well, facilitate, and then execute at an 
extremely high level 
Based on the information included in your RFP 
and our understanding of the project, Weston & 
Sampson has outlined the following approach 
that we anticipate for the track and diamond 
field project. 
Scope of Services 
The approach is divided into eight basic tasks 
as described below: 
• Task 1 – Project Scope Definition &      
Contract Agreement 
• Task 2 - Site Investigation 
• Task 3 – Preliminary Design 
• Task 4 – Design Development 
• Task 5 – Local / State Permitting 
• Task 6 – 100% Design & Contract  
Documents 
• Task 7 – Bid Assistance 
• Task 8 – Construction Administration 

Page 646

Granby, CT | Professional Engineering Services 
 
 
Task 1 | Project Scope Definition & 
Contract 
Upon selection, Weston & Sampson project 
managers shall meet with key town staff 
members to determine and define project 
scope, goals, schedule, and budgets to inform 
the development of a project task order.  
The town will share any existing information or 
mapping with the Weston & Sampson team for 
their review and use in developing the project 
task order and fee to complete design, 
permitting, bidding and construction services. 
Upon agreement, the project team will 
commence Tasks 2 – 8. 
Task 2 | Site Investigation 
Project Kick-off Meeting 
At the outset of the project, Weston & Sampson 
will facilitate a kick-off meeting with key 
stakeholders, including town officials, Board of 
Education representatives, facility staff, athletic 
department representatives, emergency 
services, and other parties identified by the 
town. This meeting will serve to confirm the 
project’s objectives, target budget, critical 
schedule milestones, scope, expectations, 
existing conditions, and construction phasing 
and duration goals. We will also conduct a site 
visit to photo-document current conditions and 
verify key elements identified in the site survey. 
Conducting site investigations at the early onset 
of this project is critical to the advancement of 
the design and permitting process. The site 
investigations will include: 
Wetlands Flagging 
Inland Wetlands & Watercourses will be flagged 
and delineated by our subconsultant Davison 
Environmental, LLC. Weston & Sampson will 
coordinate the flagging process with the 
surveyors and manage the submission of local 
regulatory site plan applications.  
Additionally, a soil report will be prepared for 
use during the regulatory review process. 
Topographic Survey 
If a recent topographic survey is not available, 
our subconsultant licensed surveyor, Denno 
Land Surveying, will perform a topographic 
survey to include areas related to the desired 
improvement program, anticipated project 
areas, and associated wetlands. 
Subsurface Investigations 
Weston & Sampson will provide subsurface 
investigations and analysis to understand water 
recharge characteristics related to stormwater 
design, the need for amending existing soils to 
establish quality turfgrass, and soil bearing 
capacities to support the proposed 
improvement plan.      
Geotechnical Engineering & Subsurface 
Exploration 
Based on the preliminary design plans, Weston 
& Sampson will prepare a subsurface 
exploration plan. Geotechnical borings and test 
pits will be completed to better understand the 
underlying conditions as they relate to 
construction of the proposed improvements. 
We will coordinate and commission a drilling 
contractor to conduct the borings. The drilling 
contractor will be responsible for contacting 
Call-Before-You-Dig (CBYD) prior to conducting 
fieldwork. It is estimated that up to two days of 
borings will be necessary.      
Based on the results of the field work, Weston 
& Sampson will prepare a geotechnical report 
and make recommendations regarding 
pavement design, excavation and earthwork, 
sports lighting footings, and other identified 
project improvements.  
 
 

Page 647

Granby, CT | Professional Engineering Services 
 
 
Natural Turf Rootzone Design  
Testing and observations will inform the sports 
field design. If natural fields are desired, 
Weston & Sampson will visit the site and 
perform testing to determine the physical, 
nutrient, and drainage components of the 
athletic field areas.  
Stormwater Subsurface Investigation & Test 
Pits 
Test pit observation (at approximately 48”-60” 
inches below the surface) and percolation tests 
will be completed.  
Deeper test pits may be required for synthetic 
turf field and stormwater management areas 
and will depend on design documents.  
Test pits provide essential information for site 
investigations, enabling engineers and 
geologists to gain a comprehensive 
understanding and direct visual examination of 
subsurface soil and rock conditions, 
groundwater levels, and potential obstructions, 
used to inform foundation/ footing designs and 
stormwater management systems.  
Private Utility Locator  
Weston & Sampson will field locate boring and 
test pit locations and commission a private 
utility locator to mark out subsurface utilities in 
the vicinity of the test pit and boring locations. 
Hazardous Materials Assessment 
If a hazardous materials assessment is needed, 
Weston & Sampson will provide a scope and 
fee to develop a remedial action plan and 
specifications. 
Task 3 | Preliminary Design (25%) 
During the preliminary design phase, Weston & 
Sampson will develop a site plan and validate 
the program cost early in the process. Site plan 
concepts will be created, illustrating the 
identified program elements and their 
connections throughout the site, all within the 
targeted budget range. Based on feedback 
from the town, the design team will refine one 
preferred site plan. 
Once the town confirms the preferred site plan, 
Weston & Sampson will engage a third-party 
cost estimator to prepare a preliminary design 

Page 648

Granby, CT | Professional Engineering Services 
 
 
opinion of probable cost. These estimators 
provide real-time construction cost data, which 
is essential in today’s fluctuating market. 
Design team attendance at town commission 
meetings will be defined in the project contract.  
At the conclusion of the preliminary design 
phase, the budget will be confirmed, and the 
scope and design of all improvements will be 
finalized. Preparation of design development 
documents, and permitting materials, will begin 
upon written authorization from the town.  
Task 4 | Design Development (75%) 
Upon written authorization approving the 
preferred preliminary design concept and 
budget from the town, the team will advance 
preliminary design drawings to the design 
development level. The team will advance the 
site plans toward a 75% Design Development 
set that is suitable for submission to regulatory 
agencies. Documents will include plans, 
details, outline specifications, and an opinion of 
probable construction costs.  
During the design development phase, the 
team will coordinate with vendors to confirm a 
palette of site materials and features. 
This advanced drawing set will consist of plans 
that outline material, layout, grading, drainage, 
utilities, sedimentation and erosion control, and 
typical details. 
Task 5 | Local / State Permitting  
Weston & Sampson will use the 75% Design 
Development documents for local and state 
permitting. 
Local and state permitting needs shall be 
assessed during project scope definition, but 
the Weston & Sampson team anticipates the 
following permits will be required: 
Local: 
• Inland Wetlands Permit (Inland Wetlands & 
Watercourses Commission) (IWWC) 
• Planning and Zoning Approvals (Planning & 
Zoning Commission)  

Page 649

Granby, CT | Professional Engineering Services 
 
 
State: 
• Connecticut Department of Energy and 
Environmental Protection (CT DEEP) Natural 
Diversity Data Base (NDDB) 
• CT DEEP General Permit for the Discharge 
of Stormwater from Construction Activities  
Task 6 | 100% Design & Contract 
Documents 
Upon receipt of regulatory approvals, the team 
will advance plans, details and specifications 
from the 75% Design Development set to 90% 
Construction Documents, and through 100% 
final design and contract documents. The third-
party cost estimator will update their opinion of 
probable cost to respond to the provided 100% 
construction documents.  
Task 7 | Bid Assistance 
Weston & Sampson will be available to attend a 
pre-bid conference and to answer the inquiries 
of prospective bidders during the bid period. 
We will furnish the information needed to issue 
any required addenda. Upon receipt of bids, 
Weston & Sampson will review bids for general 
conformance to the bid requirements. We will 
coordinate with town representatives and make 
a recommendation for the award and attend a 
bid scope meeting.  
 
Task 8 | Construction Administration 
Weston & Sampson’s construction phase 
services include the following tasks: 
• Attendance at a pre-construction meeting 
• Attend a weekly site visit and provide an 
updated site report 
• Attendance at weekly construction meetings 
and the generation of meeting minutes. 
• RFI responses and clarifications 
• Monthly Pay Application review 
• Submittal review and responses 
• Initial Punch List 
• Project closeout 
 
 
 
 
 

Page 650

Granby, CT | Professional Engineering Services 
 
 
On-Call Engineering Services   
We understand the purpose of engaging an on-
call consultant is to supplement the Town of 
Granby with flexible, cost-effective, responsive 
solutions and reliable manpower that can 
support the town’s in-house staff capabilities 
when needed. Further, on-call engineering 
services make specialized and technical 
expertise immediately available when 
necessary to satisfy project requirements that 
cannot be directly addressed by town staff. 
Such needs might include geotechnical 
engineering; discovery of environmental 
contamination; or specialized construction, 
maintenance, or repair requirements, as 
examples. The appointment of a firm that can 
provide a wide range of design, engineering 
and planning services, as well as construction, 
maintenance, repair, and licensed plant 
operations services, would be of the best and 
highest benefit to the Town of Granby. 
Weston & Sampson understands the technical 
and administrative complexities of working 
within an on-call environment. Assignments can 
come at any time, and the type of work can 
vary widely.  
On-Call Contract Experience 
Our specifically selected team is accustomed 
to performing on-call assignments with existing 
clients. As an experienced project manager, 
Ryan Chmielewski, RLA, ASBA, will effectively 
engage with supporting Weston & Sampson 
staff to respond quickly and efficiently. Our staff 
is frequently cross trained in different but 
interrelated disciplines. The multidisciplinary 
experience allows our managers the flexibility to 
match required staff experience, training, and 

Page 651

Granby, CT | Professional Engineering Services 
 
 
availability with your needs and the schedule of 
the assignments at hand. Many of our team 
possess multiple state licenses to practice in 
their given fields and specialties, and many 
possess advanced degrees, certifications, and 
licenses. Our team has the required 
professional backgrounds, experience, and 
qualifications necessary to successfully 
complete work assignments across the full 
range of disciplines and services indicated in 
the town’s RFP. 
Weston & Sampson understands the need and 
the sense of urgency that come with on-call 
assignments, having provided similar services 
to many Connecticut municipalities spanning 
decades. As a result, this level of attentiveness 
is instilled in every member of our staff 
assigned to your projects, and we strive for 
total client satisfaction. Your town staff is an 
integral part of any project team that is formed, 
and our staff is an extension of that team. As 
such, we will maintain close coordination and 
cooperation with the town’s administrative and 
operations staff throughout any on-call 
appointment.  
On-Call Scopes of Work 
The general scope of services to be provided is 
described in the town’s RFP and establishes 
the town’s basic expectations. The scope may 
be expanded and/or refined during the initiation 
and negotiation process as each assignment 
dictates. Weston & Sampson will provide 
services as detailed in written Task Orders and 
Amendment Letters that follow established 
industry standards. When we are given an 
assignment, we will be certain to fully 
understand the scope of the project, and we 
will identify issues and define the various 
elements required.  
Weston & Sampson’s ability to provide a wide 
range of required services quickly and 
successfully, including emergency and 
unanticipated assignments, is demonstrated 
through our collective on-call and individual 
project experience, which is documented 
throughout our submittal.  
Management Approach  
Our approach to any assignment is to tailor the 
scope and budget to meet the client’s specific 
project goals and needs—assignments issued 
under this on-call would be no exception. 
Weston & Sampson’s management approach 
to all projects is to work closely with our clients 
to develop the most feasible and cost-effective 
solutions to our projects. We focus on keeping 
projects on schedule and within budget, and 
we will ensure the Town of Granby is involved in 
the decision-making process. This avoids 
unnecessary surprises at a later date, which 
could result in delays, schedule extension, and 
cost increase. 
The experience of Weston & Sampson’s 
Connecticut Regional Manager and principal-
in-charge for this on-call, Raju Vasamsetti, PE, 
and the chosen project team members 
demonstrate our company’s breadth of 
capabilities and our ability to effectively 
manage and execute a variety of project types. 
Ryan Chmielewski, RLA, ASBA, team 
leader/project manager, will support Raju to 
ensure your projects are staffed with key team 
members to facilitate technical expertise for the 
scope. Regardless of the size or scope, upon 
notification of a potential assignment from the 

Page 652

Granby, CT | Professional Engineering Services 
 
 
town, our project manager will meet with town 
staff to review the assignment and determine 
the most appropriate approach, including 
schedule, budget, and other constraints. At this 
meeting, we will listen carefully and seek to fully 
understand each stated concern, desire, and 
preference regarding the assignment, so our 
scope can be tailored to meet the town’s 
expectations without surprises.  
Ryan will identify the most appropriate project 
team and collaborate to establish clear lines of 
responsibility and communication with both the 
Town of Granby and within the Weston & 
Sampson team to facilitate a project that meets 
schedule and budget. 
Subconsultant Involvement 
When an assignment requires specialized 
expertise not available directly from Weston & 
Sampson, subconsultants will be invited to 
participate, recognizing that all invitations are 
subject to the town’s prior consideration and 
approval. We understand the importance of 
working with reliable subconsultants who have 
consistently demonstrated the ability to 
respond quickly, efficiently, and cooperatively 
for your needs.  
Should a task be assigned a specific 
percentage goal, Weston & Sampson is fully 
prepared to enlist the services of minority and 
women-owned business enterprises (M/WBE). 
Partnering with disadvantaged businesses is a 
very common practice of Weston & Sampson, 
and we have very strong and long-established 
working relationships with many M/WBE firms, 
upon whom we frequently call to provide 
specialized services throughout our service 
area.  
 
 
 
 
Project Approach 
Weston & Sampson will take a similar approach 
as outlined in the Track & Diamond Field 
Project, by dividing tasks into eight basic tasks 
as described below:  
• Task 1 – Project Scope Definition &      
Contract Agreement 
• Task 2 - Site Investigation 
• Task 3 – Preliminary Design 
• Task 4 – Design Development 
• Task 5 – Local / State Permitting 
• Task 6 – 100% Design & Contract  
Documents 
• Task 7 – Bid Assistance 
• Task 8 – Construction Administration 
Supplemental Services 
Beyond our core design and engineering 
services, Weston & Sampson offers the 
following supplemental services to support the 
Town of Granby: 
• Public engagement & surveys 
• Construction inspections 
• Operations, assessment, and maintenance 
services 
What sets Weston & Sampson apart from other 
multidisciplinary offices is our core values that 
push staff toward continual growth and 
interdepartmental collaboration. Shared 
experiences help develop innovative design 
solutions that are tailored to each project and 
embrace the project vision. 
 

Page 653

Services Expected by the Town 
 
Careful planning is the cornerstone to efficient 
project management. To that end, we will notify 
the town in anticipation of any information and 
resources that may be necessary in order to 
development clear scopes of work and defined 
project goals. 
Below, we list the resources, personnel, data, 
or other assistance Weston & Sampson 
typically requests to complete tasks in a timely 
manner, depending on the type of assignment. 
We will define any additional requirements 
depending on the tasks that arise out of this 
contact.  
• A point-of-contact at the town  
• Base Geographic Information System (GIS) 
mapping and other survey information that 
may be beneficial to the assignment’s 
development and completion 
• Utility information and property data as 
necessary 
• Access for non-town-owned parcels 
• Access to site and buildings and personnel 
familiar with the uses of the areas 
• Beneficial knowledge of site conditions, as 
available  
• Historical design plans (record or “As-Built”) 
and specifications for existing facilities  
• Boring logs or other subsurface information  
• Operational history of existing facilities  
• Available engineering data and existing 
studies / evaluations from sites or areas of 
interest 
• A machine and operator, water, and 
contacting Call-Before-You-Dig before 
excavation of test pits. 
• Pay associated fees for non-local permitting 
• Test pit operator, equipment, and site repair 
 
 
 
 
 Project Highlight:  Wayland High Athletic Fields & Stadium Renovations, Wayland, MA 

Page 654

Page 7 of 7 
APPENDIX A 
Cost Proposal 
Name of Engineering Firm: __:HVWRQ	6DPSVRQ(QJLQHHUV,QF_________________________ 
Services Needed 
On-Call Engineering and Related Services 
Please indicate your firm’s hourly fees over the five-year period of the contract 
Billing Category Hourly Billing Rate 
Project Manager ________________ 
Chief Engineer ________________ 
Engineer ________________ 
Technician Support ________________ 
Clerical/Researcher ________________ 
Other  ________________ 
Other Expenses (if applicable): 
Identify any other categories and costs required to provide Engineering and On-Call 
services that are not included above:  
________________________________________________________________________ 
________________________________________________________________________ 
________________________________________________________________________ 
3OHDVHVHHWKHIROORZLQJDWWDFKPHQWIRURXUKRXUO\IHHVRYHUWKHILYH\HDUSHULRG
DVZHOODVDGGLWLRQDOFRVWLQIRUPDWLRQ

Page 655

Proposed Fee Schedule 
 
Hourly Rates 
Weston & Sampson is committed to providing 
maximum value on all our projects, and we are 
pleased to provide our Hourly Rate Schedule 
for on-call engineering services. Weston & 
Sampson is well positioned to provide the 
required services for the Town of Granby, and 
we are confident that the experience of our 
project team will ensure expert, timely, cost-
effective services for your project. 
Other Necessary Costs 
These rates shall be valid through the first year 
of contract services and are subject to annual 
adjustment through negotiations and contract 
revision to include rate increases that average 
4% annually.  
For assignments that require fees to be billed 
on an hourly rate basis, we anticipate 
computing and billing direct expenses and any 
subconsultant costs using a 5% markup. Travel 
mileage costs will be billed at the current 
Federal Mileage Rate in effect at the time 
services are rendered, presently $0.725 per 
mile.  
Hourly Rate Schedule 
Labor Category Year 1 Year 2 Year 3 Year 4 Year 5 
Principal In Charge $355 $369 $384 $399 $415 
Discipline Leader $325 $338 $352 $366 $381 
Director of Design $315 $328 $341 $354 $369 
Senior Technical Leader / Senior 
Team Leader $265 $276 $287 $298 $310 
Team Leader/ Senior Project 
Manager $290 $302 $314 $326 $339 
Licensed Environmental 
Professional  $260 $270 $281 $292 $304 
Senior Project Manager $235 $244 $254 $264 $275 
Project Manager II $220 $229 $238 $247 $257 
Project Manager I $205 $213 $222 $231 $240 
Senior Engineer / Designer / 
Planner $185 $192 $200 $208 $216 
Project Engineer / Designer / 
Planner $170 $177 $184 $191 $199 
Engineer / Designer / Planner III $155 $161 $168 $174 $181 
Engineer / Designer / Planner II $138 $144 $149 $155 $161 
Engineer / Designer / Planner I $125 $130 $135 $141 $146 
Environmental Scientist I $110 $114 $119 $124 $129 
Draftsperson / Technician $105 $109 $114 $118 $123 
Clerical / Researcher $130 $135 $141 $146 $152 
Resident Engineer (PE and/or 
NICET IV) $210 $218 $227 $236 $246 
Senior Inspector (NICET IV) / 
Construction Manager $180 $187 $195 $202 $211 
Inspector (NICET III) $155 $161 $168 $174 $181 
Resident Representative (NICET II) $145 $151 $157 $163 $170 

Page 656

Response to Evaluation Criteria 
 
Weston & Sampson has reviewed the 
Evaluation Criteria outlined in your RFP, and we 
have taken care to address these items 
throughout our submittal, thereby 
demonstrating our understanding of and ability 
to complete your project. We are confident that 
the Town of Granby will find Weston & 
Sampson compliant and fully responsive to the 
RFP requirements and that our submission 
successfully reinforces the depth and breadth 
of our credentials. In the graphic below, we 
have identified where in our response we 
address each of the evaluation criteria. 
 
 
 
 

Page 657

westonandsampson.com
712 Brook Street | Rocky Hill, CT 06067
PROPOSAL | July 2026

Page 658

Page 659

Page 660

Page 661

Page 662

Page 663

Page 664

Page 665

Page 666

Page 667

Page 668

Page 669

Page 670

Page 671

Page 672

Page 673

Page 674

Page 675

Page 676

Page 677

Page 678

Page 679

Page 680

Page 681

Page 682

Page 683

Page 684

Page 685

Page 686

Page 687

Page 688

Page 689

TOWN OF GRANBY
MEMORANDUM                                                          DATE: July 28, 2026
TO: Mike Walsh, Town Manager
FROM:   Mark Neumann, Public Building and Capital Project Committee
REGARDING: Milestone Events for the Bond Questions
At the July meeting of the Public Building and Capital Project Committee, I committed to the
fellow committee members to write a set of milestones for each of the Bond questions for use in
discussion at the August meeting. 
My thoughts are summarized in the table below:
Question
Library 
Expansion
Middle 
School
Repair 
and 
Design
Track 
and Field
Repair 
and 
Replace
Park 
Pickleball 
and
All season
Bathroom
Sewer Pump 
Maintenance
Number 1 2 3 4 5
Issue Engineering 
RFP 19-Jun 19-Jun 19-Jun 19-Jun 19-Jun
Receive Engineering 
RFP responses 24-Jul 24-Jul 24-Jul 24-Jul 24-Jul
BOS Bond Questions 
approval 3-Aug 3-Aug 3-Aug 3-Aug 3-Aug
August meeting of the
PBCPC 12-Aug 12-Aug 12-Aug 12-Aug 12-Aug
Draft the Question 
Guide for Voter 3-Sep 3-Sep
Interview Engineering
firms 7-Sep 7-Sep 7-Sep 8-Sep 8-Sep
September meeting 
of the PBCPC 9-Sep 9-Sep 9-Sep 9-Sep 9-Sep
Select Engineer 15-Sep 15-Sep 15-Sep 15-Sep 15-Sep

Page 690

Draft the Question 
Guide for Voter 24-Sep 24-Sep 24-Sep
BOF Bond Question 
approval 28-Sep 28-Sep 28-Sep 28-Sep 28-Sep
Finalize the Question 
Guide for Voter 29-Sep 29-Sep 29-Sep 29-Sep 29-Sep
October meeting of 
the PBCPC 14-Oct 14-Oct 14-Oct 14-Oct 14-Oct
November 3rd State 
and Federal election 3-Nov 3-Nov 3-Nov 3-Nov 3-Nov
November meeting of
the PBCPC 11-Nov 11-Nov 11-Nov 11-Nov 11-Nov
Hold Open House 12-Nov 12-Nov 12-Nov 12-Nov 12-Nov
Town Meeting 1-Dec 1-Dec 1-Dec 1-Dec 1-Dec
Town Referendum 8-Dec 8-Dec 8-Dec 8-Dec 8-Dec

Page 691

 
TOWN OF GRANBY 
 
MEMORANDUM DATE:   July 15, 2026 
 
TO:   The Granby Board of Selectmen 
 
FROM:     Betsy Mazzotta 
 
REGARDING:    Draft Template for Bond/Capital Project Descriptions 
 
 
Attached for your review is a draft template for the capital project descriptions which will be used 
to provide information on the proposed capital projects in a clear and consistent format. The 
materials will be used to improve transparency and communication with residents by explaining 
the purpose, need and benefit of each project. 
 
Each report will include the following elements: 
 
1. A detailed written description of the project. 
2. Any available drawings or exhibits depicting the project such as a site plan, floor plan, 
schematics, etc. 
3. Cost estimate for the project and how it was developed. 
 
Additionally, a brief background on the 10-year Capital Improvement Plan, the role of the Capital 
Program Priorities Advisory Committee (CPPAC), the role of the Public Building and Capital 
Project Committee (PBCPC) and a timeline for the process were also included. 
 
The attached example has been prepared for the proposed Pickleball Courts at Salmon Brook 
Park to illustrate how the template will be used. Once the board approves the template, a 
project description will be prepared for each of the proposed projects and printed copies will be 
available for distribution. The information will also be posted on the Town website on a 
dedicated page accessible from the homepage, with links to each project. A draft of the 
proposed website post is also attached for your review. 
 
Please review the attached documents and provide any comments or suggested revisions. 

Page 692

  
TOWN OF GRANBY 
 
PROPOSED CAPITAL PROJECTS 2026 
__________________________________________________________________ 
 
Project: Pickleball Courts at Salmon Brook Park 
 
Background 
The Town of Granby, in compliance with the Town Charter, compiles a 10-year Capital 
Improvement Plan for projects over $250,000 which is used as a working document to 
support the annual budget and track the projects. 
 
The Capital Program Priorities Advisory Committee was convened in October of 2025 to 
develop criteria to prioritize the capital improvement projects, consider and review the 
projects and make a recommendation on which projects to move forward to the Board 
of Selectmen for consideration. CPPAC ultimately recommended a General Fund 
FY2026 Capital Funding Package totaling $19,450,000 which includes improvements to 
the high school athletic fields, GMMS repairs and design and a renovation to the 
Granby Public Library. 
 
An additional $2,000,000 was also approved for maintenance of the Town sewer pumps 
and the installation of pickleball courts and year-round bathrooms at Salmon Brook 
Park, which will be funded through the Sewer Utility Fund and the Parks & Recreation 
Fund, respectively. 
 
Project Description 
The Town of Granby provides pickleball courts for use by residents on the existing 
tennis courts at Salmon Brook Park. Due to complaints by several residents neighboring 
the park, noise reducing barriers were installed in the Spring of 2026. However, the 
permanent solution is to relocate the courts to an area in the park which is at least 300 
feet from residential housing. The addition of stand-alone pickleball courts at Salmon 
Brook Park is strongly supported by residents, recommended by the Parks & Recreation 
Board and supported by the GZA Parks Master Plan. 
 
The preliminary plan and location of the courts is outlined in the attached summary 
report from GZA. A conceptual drawing of the courts is also attached. 
 
Preliminary Cost Estimate: $250,000 
The construction of a single pickleball court with lights is approximately $80,000. With 
efficiencies secured through scale and mobilization, it is estimated four courts can be 
completed with an allocation of $250,000. It is important to note that the project has not 

Page 693

been scoped, sized, priced or bid, and $250,000 is the Town’s best estimate of the cost 
to complete the project. The Town does not prefund costs for engineers or architects to 
design or scope a project before it is funded. Project work begins, including developing 
and issuing a request for proposals when funding is put into place. 
Funding 
The Town accounts for the revenue and expenses associated with running the parks 
system through the Parks & Recreation special revenue fund with the cost of operating 
the system borne primarily by the users of the system through user and rental fees. 
 
The Parks & Recreation Fund had a balance of $432k as of June 30, 2025, and by 
design would pay for the pickleball courts and support the debt service, should bonds 
be issued. Since the balance was created from user and rental fees, any outflow to 
support this project is appropriate. 
 
The recommendation from the Board of Selectmen and Board of Finance is to issue 20-
year bonds in the amount of $250,000 to fund the project. 
 
Public Building and Capital Project Committee 
Once a capital project is approved by the voters, the Public Building and Capital Project 
Committee is charged with overseeing its planning, design, bidding, construction, 
budget and progress through completion. The PBCPC is a nine-member committee 
chaired by Selectman Mark Neumann and meets on the second Wednesday of each 
month at 6:00 p.m. at the Senior Center. Residents are encouraged and welcome to 
attend the meetings. 
 
Timeline 
 
Description Date 
The Board of Selectmen officially receives the proceedings on the bond 
questions, allowing the public to review and comment. 
 
The Board of Selectmen make any final edits and approve the 
resolutions  
 
Board of Finance approves the resolutions  
Open House 
6 p.m. 
Senior Center Community Room 
 
Town Meeting 
7:00 p.m., Town Hall Meeting Room 12/1/26 
Town Referendum 
8:00 a.m. – 8:00 p.m. 
Town Hall Meeting Room 12/8/26 
 

Page 694

Page 695

PROPOSED
CAPITAL PROJECTS
The Town of Granby is proposing to bond five
capital projects in 2027. Use the links below
to get a detailed description of each project,
any available exhibits and cost estimates. 
High School Athletic Fields
Middle School Repairs & Design
Granby Public Library Renovation
Sewer Pumps Maintenance
SBP Pickleball Courts & Bathroom