Towns / Granby / Public Building and Capital Project Committee / Aug 12, 2026
Public Building and Capital Project Committee, Aug 12, 2026
Granby Public Building and Capital Project Committee Hide agendas that already have minutesDocuments
| Type | Document | Pages | Open |
|---|---|---|---|
| minutesminutes | Public Building & Capital Project Committee Regular Meeting Minutes | 3 | PDF download · town site |
| agenda | Public Building & Capital Project Committee Regular Meeting | 2 | PDF download · town site |
| packetpacket | Public Building & Capital Project Committee Regular Meeting (packet) Not attached: this packet is 303 MB, too large to host here. Use the town site link. |
695 | town site |
Summary of the minutes
AI-generated summary. Each line links to the PDF page it came from; check it before relying on it.
Read the official minutes (PDF, 3 pages) The PDF is the record; this summary is a guide to it.
The committee approved the July 8, 2026 minutes and formed a subcommittee to review engineering RFP proposals for future capital projects. The committee also reviewed proposed bond projects for the Granby Public Library ($7.5 million), Salmon Brook Park pickleball courts and bathroom, and sewer pump maintenance ($1.5 million), with no vote taken on those projects.
Decisions (3) · all reported votes
- Approval of PBCPC Regular Meeting Minutes – July 8, 2026
Committee voted to approve the minutes of July 8, 2026, as presented.
Vote: Motion by W. Pascucci, seconded by M. Lengvarsky, carried 6-0-0 · p. 1 - Engineering RFP Responses – subcommittee formation
Committee voted to form a subcommittee to review the submitted proposals and make a recommendation to the full committee. Subcommittee members: Peter Anderson, Mark Gottlieb and Mark Neumann.
Vote: Motion by W. Pascucci, seconded by M. Gottlieb, carried 6-0-0 · p. 1 - Adjournment
Committee voted to adjourn the meeting at 7:00 p.m.
Vote: Motion by D. Peling, seconded by W. Pascucci, carried 6-0-0 · p. 3
Also discussed (7)
- Board of Education Projects – tour of Middle School and high school athletic fields: PBCPC will tour the Middle School and the high school athletic fields with BOE Director of Facilities Christopher Degray on Wednesday, September 9, 2026, at 4:30p.m. · p. 1
- Library Renovation Introduction $7.5 million $6 million $1.5 million: Town proposes a $7.5 million project to renovate the Granby Public Library; $6 million in taxpayer funds in support of the bonds and $1.5 million through grants and private donations. Taxpayers will not be asked for more than the original $6 million. Introduced; no vote recorded. · p. 1, p. 2
- SBP Pickleball Courts and Year-Round Bathroom – Next Steps $250,000 $250,000: Presented as Town project; relocation of pickleball courts to an area at least 300 feet from residential housing and a year-round bathroom near the Rovers field at Salmon Brook Park. Each estimated at $250,000. No vote recorded. · p. 2
- Sewer Pump Maintenance – Next Steps $1.5 million: Town proposes a $1.5 million project to assess the sewer system and bring pumps up to current standards, including hiring an outside firm. No vote recorded. · p. 2
- Milestones for bond questions: Chairman reviewed the milestones for each of the bond questions with the committee. No vote recorded. · p. 2
- Professional Services RFPs: Committee did not identify any other services to consider an RFP for at this time. · p. 2
- Bond/Capital Template – Website Information: Board of Selectmen approved a template including project title, cost, and brief summary of each project, to be posted on the Town's website. · p. 2
Summary of the agenda: Public Building & Capital Project Committee Regular Meeting
AI-generated summary.
This is the agenda for the Granby Public Building & Capital Project Committee regular meeting on August 12, 2026 at 6 p.m. at the Senior Center. It lists items to be discussed, including approval of July 8, 2026 minutes, engineering RFP responses, Board of Education and Town projects, and new business.
On the agenda (12)
- Approval of PBCPC Regular Meeting Minutes - July 8, 2026 · p. 1
- Engineering RFP Responses (eleven proposals listed: Benesch, BL Companies, Bowman, BSC, Beta Group, GZA, H2M, Level Engineering, SLR, Weston & Sampson, Phlow Water Advisory Group) · p. 1
- GMMS Repairs And Design/Scoping Work - Next Steps (Board of Education project) · p. 1
- GMHS Stadium Field, Track, Field Two, Baseball/Softball Fields - Next Steps (Board of Education project) · p. 1
- CIP Policy Discussion - Town Requests · p. 1
- Library Renovation Introduction · p. 2
- SBP Pickleball Courts And Year-Round Bathroom - Next Steps · p. 2
- Sewer Pump Maintenance - Next Steps · p. 2
- Milestones - Chairman Neumann · p. 2
- Creation of Subcommittee to Complete Engineering Interviews · p. 2
- Professional Services RFPs That Might Be Needed · p. 2
- Bond/Capital Template - Website Information · p. 2
This PDF is a scan; its text was read by OCR and may contain errors.
Full text of the documents
View the minutes PDF on this page (Public Building & Capital Project Committee Regular Meeting Minutes)
Text of the minutes (Public Building & Capital Project Committee Regular Meeting Minutes, 3 pages)
Page 1 · open in PDF
TOWN OF GRANBY PUBLIC BUILDING & CAPITAL PROJECT COMMITTEE REGULAR MEETING MINUTES AUGUST 12, 2026 PRESENT: Chairman Mark Ne umann, Peter Anderson, Mark Gottlieb, Michael Lengvarsky, William Pascucci and David Peling ALSO PRESENT: Cheri Burke, Superintendent of Schools and Mike Walsh, Town Manager ABSENT: Anne Adamson, Christopher Lavigne, Kent McCord 1. PLEDGE OF ALLEGIANCE 2. MINUTES 2.I. Approval of PBCPC Regular Meeting Minutes – July 8, 2026 ON A MOTION by W. Pascucci, seconded by M. Lengvarsky, the committee voted (6-0-0) to approve the minutes of July 8, 2026, as presented. 3. OLD BUSINESS 3.I. Engineering RFP Responses Town Manager Walsh presented the list of firms which responded to the RFP for an engineering firm to consult on the capital projects if approved by the voters. Chairman Neumann requested volunteers to form a subcommittee to review the proposals and report back to the full committee with a recommendation for interviews. ON A MOTION by W. Pascucci, seconded by M. Gottlieb, the committee voted (6- 0-0) to form a subcommittee to review the submitted proposals and make a recommendation to the full committee. Subcommittee members are Peter Anderson, Mark Gottlieb and Mark Neumann. 3.II. Board of Education Projects The PBCPC will tour the Middle School and the high school athletic fields with BOE Director of Facilities Christopher Degray on Wednesday, September 9, 2026, at 4:30p.m. 3.II.1. GMMS Repairs and Design/Scoping Work – Next Steps This agenda item was covered with item 3.II. 3.II.2. GMHS Stadium Field, Track, Field Two, Baseball/Softball Fields – Next Steps This agenda item was covered with item 3.II. 3.III. Town Projects The Town Manager provided an overview of the bonding process and introduced each of the proposed Town projects. 3.III.1. Library Renovation Introduction The Town is proposing a $7.5 million project to renovate the Granby Public Library. Of the $7.5 million dollars, $6 million will be taxpayer funds in support of the bonds and t he difference of $ 1.5 million will be raised through grants and private
Page 2 · open in PDF
PBCPC Minutes 8/12/26 Page 2 donations. The scope of the project may expand with additional donat ions and grants. However, taxpayers will not be asked for more than the original $6 million. 3.III.2. SBP Pickleball Courts and Year-Round Bathroom – Next Steps The Town provides pickleball courts for use by residents on the existing tennis courts at Salmon Brook Park. Due to complaints by several residents neighboring the park, noise reducing barriers were installed in the spring of 2026. However, the permanent solution is to relocate the courts to an area in the park which is at least 300 feet from residential housing. The addition of stand- alone pickleball courts at Salmon Brook Park is strongly supported by residents, recommended by the Parks & Recreation Board and supported by the GZA Parks Master Plan. The cost for the pickleball courts is estimated to be $250,000. The second part of this project is to build a year -round bathroom near the Rovers field at Salmon Brook Park. Residents are frequenting the park in greater numbers with the completion of the walking path in 2024 and the use is expected to increase when the path is extended through the Rovers field to the parking lot on Route 20. Currently there is no y ear-round bathroom for the convenience of residents, especially at the north end of the park. Adding this amenity to the park is supported by residents, recommended by the Parks & Recreation board and by the GZA Parks Master Plan. The cost for the year-round bathroom at Salmon Brook Park is estimated to be $250,000. 3.III.3. Sewer Pump Maintenance – Next Steps The Town is proposing a $1.5 million project to assess the condition of the Town sewer system and to bring the pumps up to current standards. An outside fi rm would be hired to review the 2024 sewer system infiltration study, inspect the three sewer pumps and define the scope of the work to add more reliable electricity, an updated warning system, replace aging mechanicals and design a backup plan for the system. 4. NEW BUSINESS 4.I. Milestones – Chairman Neumann The chairman reviewed the milestones for each of the bond questions with the committee. 4.II. Creation of Subcommittee to Complete Engineering Interviews This agenda item was covered with item 3.I. 4.III. Professional Services RFP’s That Might Be Needed The committee did not identify any other services to consider an RFP for at this time. 4.IV. Bond/Capital Template – Website Information The Board of Selectmen approved a template which will include the project ti tle, cost, and a brief summary of each project that will be posted on the Town’s website to provide detailed information to the residents and anyone else interested in learning more about the proposed projects. 5. DISCUSSION OF ACTION ITEMS FOR THE NEXT MEETING
Page 3 · open in PDF
PBCPC Minutes 8/12/26 Page 3 The subcommittee will present their recommendations on the final three to five engineering firms to be interviewed for consideration. 6. PUBLIC COMMENT There was no public comment. 7. ADJOURNMENT: ON A MOTION by D. Peling , seconded by W. Pascucci , the committee voted (6-0-0) to adjourn the meeting at 7:00 p.m. The next regular meeting of the Public Building & Capital Project Committee is scheduled for Wednesday, September 9, 2026, at 6p.m. at the Senior Center. Respectfully submitted, Betsy Mazzotta Recording Secretary
View the agenda PDF on this page (Public Building & Capital Project Committee Regular Meeting)
Text read from the scanned agenda (OCR) (Public Building & Capital Project Committee Regular Meeting, 2 pages)
Page 1 · open in PDF
Town of Granby is inviting you to a scheduled Zoom meeting. https://us02web.zoom.us/j/83944837028? pwd=CkmJoawaXEzdY6YcA4CKLPlJr0IQ7M.1 Meeting ID: 839 4483 7028 Passcode: 247687 **TOWN OF GRANBY** **Public Building & Capital Project Committee** **Regular Meeting Agenda** **Wednesday, August 12, 2026 – 6 p.m.** **Senior Center** 1. Pledge Of Allegiance 2. Minutes 2.I. Approval Of PBCPC Regular Meeting Minutes - July 8, 2026 Documents: PBCPC MINUTES 07-08-2026.PDF 3. Old Business 3.I. Engineering RFP Responses Documents: 3A BENESCH TOWN OF GRANBY ON-CALL PROFESSIONAL ENGINEERING SERVICES.PDF 3B BL COMPANIES_GRANBY RFP PROFESSIONAL ENGINEERING.PDF 3C BOWMAN_TOWN OF GRANBY.PDF 3D BSC_GRANBY_PROFESSIONAL ENGINEERING SERVICES_PROPOSAL.PDF 3E DIGITAL - BETA GROUP RESPONSE TO RFP - ON-CALL ENGINEERING SERVICES.PDF 3F GZA PROPOSAL ENGINEERING SERVICES.PDF 3G H2M PROPOSAL FOR PROFESSIONAL ENGINEERING SERVICES_EMAIL.PDF 3H LEVEL ENGINEERING.PDF 3I SLR_PROPOSAL.PDF 3J WESTON SAMPSON SUBMITTAL_PROFESSIONAL ENGINEERING SERVICES.PDF 3K PHLOW WATER ADVISORY GROUP.PDF 3.II. Board Of Education Projects 3.II.i. GMMS Repairs And Design/Scoping Work - Next Steps 3.II.ii. GMHS Stadium Field, Track, Field Two, Baseball/Softball Fields - Next Steps 3.III. Town Projects Documents: CIP POLICY DISCUSSION_TOWN REQUESTS.PDF
Page 2 · open in PDF
3.III.i. Library Renovation Introduction 3.III.ii. SBP Pickleball Courts And Year-Round Bathroom - Next Steps 3.III.iii. Sewer Pump Maintenance - Next Steps 4. New Business 4.I. Milestones - Chairman Neumann Documents: 2607029 MILESTONES MEMO.PDF 4.II. Creation Of Subcommittee To Complete Engineering Interviews 4.III. Professional Services RFPs That Might Be Needed 4.IV. Bond/Capital Template - Website Information Documents: DRAFT TEMPLATE FOR CAPITAL PROJECT DESCRIPTIONS.PDF 5. Discussion Of Action Items For The Next Meeting 6. Public Comment 7. Adjournment The next regular meeting of the Public Building & Capital Project Committee is scheduled for Wednesday, September 9, 2026, at 6 p.m. at the Senior Center.
Text of the packet (Public Building & Capital Project Committee Regular Meeting (packet), 695 pages)
Page 1
Town of Granby is inviting you to a scheduled Zoom meeting. https://us02web.zoom.us/j/83944837028? pwd=CkmJoawaXEzdY6YcA4CKLPIJr0lQ7M.1 Meeting ID: 839 4483 7028 Passcode: 247687 TOWN OF GRANBY Public Building & Capital Project Committee Regular Meeting Agenda Wednesday, August 12, 2026 – 6 p.m. Senior Center Pledge Of Allegiance Minutes Approval Of PBCPC Regular Meeting Minutes - July 8, 2026 PBCPC MINUTES 07-08-2026.PDF Old Business Engineering RFP Responses 3A BENESCH TOWN OF GRANBY ON-CALL PROFESSIONAL ENGINEERING SERVICES.PDF 3B BL COMPANIES_GRANBY RFP PROFESSIONAL ENGINEERING.PDF 3C BOWMAN_TOWN OF GRANBY.PDF 3D BSC_GRANBY_PROFESSIONAL ENGINEERING SERVICES_PROPOSAL.PDF 3E DIGITAL - BETA GROUP RESPONSE TO RFP - ON-CALL ENGINEERING SERVICES.PDF 3F GZA PROPOSAL ENGINEERING SERVICES.PDF 3G H2M PROPOSAL FOR PROFESSIONAL ENGINEERING SERVICES_EMAIL.PDF 3H LEVEL ENGINEERING.PDF 3I SLR_PROPOSAL.PDF 3J WESTON SAMPSON SUBMITTAL_PROFESSIONAL ENGINEERING SERVICES.PDF 3K PHLOW WATER ADVISORY GROUP.PDF Board Of Education Projects GMMS Repairs And Design/Scoping Work - Next Steps GMHS Stadium Field, Track, Field Two, Baseball/Softball Fields - Next Steps Town Projects CIP POLICY DISCUSSION_ TOWN REQUESTS.PDF Library Renovation Introduction SBP Pickleball Courts And Year-Round Bathroom - Next Steps Sewer Pump Maintenance - Next Steps New Business Milestones - Chairman Neumann 2607029 MILESTONES MEMO.PDF Creation Of Subcommittee To Complete Engineering Interviews Professional Services RFPs That Might Be Needed Bond/Capital Template - Website Information DRAFT TEMPLATE FOR CAPITAL PROJECT DESCRIPTIONS.PDF Discussion Of Action Items For The Next Meeting Public Comment Adjournment The next regular meeting of the Public Building & Capital Project Committee is scheduled for Wednesday, September 9, 2026, at 6 p.m. at the Senior Center. 1. 2. 2.I. Documents: 3. 3.I. Documents: 3.II. 3.II.i. 3.II.ii. 3.III. Documents: 3.III.i. 3.III.ii. 3.III.iii. 4. 4.I. Documents: 4.II. 4.III. 4.IV. Documents: 5. 6. 7.
Page 2
Town of Granby is inviting you to a scheduled Zoom meeting. https://us02web.zoom.us/j/83944837028? pwd=CkmJoawaXEzdY6YcA4CKLPIJr0lQ7M.1 Meeting ID: 839 4483 7028 Passcode: 247687 TOWN OF GRANBY Public Building & Capital Project Committee Regular Meeting Agenda Wednesday, August 12, 2026 – 6 p.m. Senior Center Pledge Of Allegiance Minutes Approval Of PBCPC Regular Meeting Minutes - July 8, 2026 PBCPC MINUTES 07-08-2026.PDF Old Business Engineering RFP Responses 3A BENESCH TOWN OF GRANBY ON-CALL PROFESSIONAL ENGINEERING SERVICES.PDF 3B BL COMPANIES_GRANBY RFP PROFESSIONAL ENGINEERING.PDF 3C BOWMAN_TOWN OF GRANBY.PDF 3D BSC_GRANBY_PROFESSIONAL ENGINEERING SERVICES_PROPOSAL.PDF 3E DIGITAL - BETA GROUP RESPONSE TO RFP - ON-CALL ENGINEERING SERVICES.PDF 3F GZA PROPOSAL ENGINEERING SERVICES.PDF 3G H2M PROPOSAL FOR PROFESSIONAL ENGINEERING SERVICES_EMAIL.PDF 3H LEVEL ENGINEERING.PDF 3I SLR_PROPOSAL.PDF 3J WESTON SAMPSON SUBMITTAL_PROFESSIONAL ENGINEERING SERVICES.PDF 3K PHLOW WATER ADVISORY GROUP.PDF Board Of Education Projects GMMS Repairs And Design/Scoping Work - Next Steps GMHS Stadium Field, Track, Field Two, Baseball/Softball Fields - Next Steps Town Projects CIP POLICY DISCUSSION_ TOWN REQUESTS.PDF Library Renovation Introduction SBP Pickleball Courts And Year-Round Bathroom - Next Steps Sewer Pump Maintenance - Next Steps New Business Milestones - Chairman Neumann 2607029 MILESTONES MEMO.PDF Creation Of Subcommittee To Complete Engineering Interviews Professional Services RFPs That Might Be Needed Bond/Capital Template - Website Information DRAFT TEMPLATE FOR CAPITAL PROJECT DESCRIPTIONS.PDF Discussion Of Action Items For The Next Meeting Public Comment Adjournment The next regular meeting of the Public Building & Capital Project Committee is scheduled for Wednesday, September 9, 2026, at 6 p.m. at the Senior Center. 1. 2. 2.I. Documents: 3. 3.I. Documents: 3.II. 3.II.i. 3.II.ii. 3.III. Documents: 3.III.i. 3.III.ii. 3.III.iii. 4. 4.I. Documents: 4.II. 4.III. 4.IV. Documents: 5. 6. 7.
Page 3
TOWN OF GRANBY PUBLIC BUILDING & CAPITAL PROJECT COMMITTEE REGULAR MEETING MINUTES JULY 8, 2026 PRESENT: Anne Adamson, Peter Anderson, Mark Gottlieb, Christopher Lavigne, Michael Lengvarsky, Kent McCord, Mark Neumann, and William Pascucci ALSO PRESENT: Cheri Burke, Superintendent of Schools and Mike Walsh, Town Manager ABSENT: David Peling 1. PLEDGE OF ALLEGIANCE 2. INTRODUCTION OF MEMBERS AND OPENING REMARKS The members of the committee were introduced, and First Selectman Mark Fiorentino welcomed the group and thanked them for their willingness to serve on the committee. 3. ELECT CHAIR, VICE CHAIR AND SECRETARY Mark Neumann was nominated to serve as chairman. There being no further nominations, nominations were closed. By unanimous vote, Mark Neumann was elected chairman. Anne Adamson was nominated to serve as vice- chairman. There being no further nominations, nominations were closed. By unanimous vote, Anne Adamson was elected vice- chairman. There were no nominations for the position of secretary. 4. ADOPT ROBERTS RULES ON A MOTION by M. Gottlieb, seconded by M. Lengvarsky, the committee voted (8-0-0) to conduct its meetings in accordance with Robert’s Rules of Order. 5. ADOPT MEETING SCHEDULE ON A MOTION by A. Adamson, seconded by W. Pascucci, the committee voted (8-0-0) to adopt the meeting schedule submitted to the Town clerk and meet regularly on the second Wednesday of each month. 6. DISCUSSION ON BOND REFERENDUM QUESTIONS, PROCEEDINGS & PROCESS Town Manager Walsh provided an overview of the charge of the committee and the bonding process. 7. OVERVIEW OF INDVIDUAL PROJECTS 7.I. Granby Public Library Renovation and Expansion Project Discussion of the library project was deferred to a future meeting. 7.II. Granby Memorial Middle School Repairs and Design/Scoping Work Project Superintendent Burke and Christopher Degray, BOE Director of Facilities presented an overview of the middle school project and the high school athletic fields project.
Page 4
PBCPC Minutes 7/8/26 Page 2 7.III. High School Baseball/Softball Fields This agenda item was incorporated into the discussion of agenda item 7.II. 7.IV. High School Stadium Field, Track, and Field Two This agenda item was incorporated into the discussion of agenda item 7.II. 7.V. Salmon Brook Park Pickleball Courts and Year-Round Bathroom Project Discussion of the Salmon Brook Park projects was deferred to a future meeting. 7.VI. Sewer Pump Maintenance Project Discussion of the sewer pump project was deferred to a future meeting. 8. DISCUSSION OF ACTION ITEMS FOR NEXT MEETING 8.I. Engineering RFP Issued and Responses Shared Responses to the Request for Proposal for an engineering firm will be shared and discussed at the next meeting. 9. ADJOURNMENT: ON A MOTION by K. McCord, seconded by A. Adamson, the committee voted (8-0-0) to adjourn the meeting at 7:56 p.m. Respectfully submitted, Betsy Mazzotta Recording Secretary
Page 5
STATEMENT OF QUALIFICATIONS On-Call Professional Engineering Services The Town of Granby JULY 2026
Page 6
Please note: This document is designed for double-sided printing. Intentional blank pages are included for proper alignment.
Page 7
July 24, 2026 Mike Walsh Town Manager Town of Granby Manager’s Office 15 North Granby Road Granby, CT 06035 RE: Town of Granby Request for Proposals – Professional Engineering Services Dear Mr. Walsh: The Town of Granby is committed to building a community where residents of all ages have access to quality public spaces and recreational opportunities. The improvements outlined in this RFP represent meaningful investments in the health, vitality and pride of your community. Benesch is proud to submit our qualifications for this engagement, and we are fully committed to delivering the professional engineering services the Town deserves, on time and within budget, through every phase of planning, design and construction. Benesch understands the Town is seeking a State-licensed Professional Engineer to deliver comprehensive civil engineering services under a five-year, task-order-based contract — spanning planning, design and construction administration for the replacement of the athletic/running track and baseball and softball fields at the high school/middle school complex, as well as on-call support for a year-round restroom at Salmon Brook Park, new pickleball courts and a sewer pump assessment. We bring more than technical execution to this partnership; our value methodology experts proactively identify cost-saving opportunities and efficiencies at every phase, so the Town gets the most out of every dollar invested. PROVEN EXPERIENCE ON SIMILAR PROJECTS: Our firm’s expertise aligns perfectly to meet the demands of this project. In fact, we have a demonstrated track record of successfully completing projects of similar complexity. Our recent successful completion of Jess Dow Field Renovations Synthetic Turf Field at Southern Connecticut State University (DAS Project BI-RS-369) is a testament to our capacity to excel on projects within this contract’s scope, including civil engineering, surveying, and landscape architecture. This project was designed and built within five months in time for the upcoming Special Olympics to be held there. AVAILABLE LOCAL TEAM WITH DEEP BENCH STRENGTH: Our Glastonbury office is approximately 30 minutes from Granby, positioning our team for responsive site visits, stakeholder meetings and construction observation without the travel costs or delays. Project Manager Will Walter, PE, is a Windsor resident, just 15 minutes from Granby, giving him an intimate familiarity with the local community, regulatory landscape and construction environment that benefits the Town from day one. His proximity also means that when an urgent site condition or unexpected challenge arises, Will can be on the ground quickly. FULL-SERVICE FIRM, WITH IN-HOUSE CAPABILITIES: Benesch offers a robust team of qualified experts with the depth of resources to accommodate all tasks associated with this project. Our full-service structure streamlines communications and the design process, resulting in efficiencies that save the Town time and money. We have the in- house expertise to address any challenge that arises during the planning, design and construction of Granby’s athletic facilities and on-call infrastructure needs — there is no challenge too large or too specialized for our team. Benesch is committed to a true partnership with the Town of Granby throughout the contract term, serving as a trusted extension of your staff and a proactive advocate for securing grant funding opportunities that advance your capital improvement goals. We appreciate the Town of Granby’s consideration and look forward to the opportunity to serve your community. Please do not hesitate to contact us with any questions regarding our qualifications. Sincerely, Will Walter, PE 200 Glastonbury Blvd, Suite 201 Glastonbury, CT 06033 www.benesch.com P 860-633-8341 PROJECT CONTACT Will Walter, PE, LEED AP Project Manager P 860-494-4359 E wwalter@benesch.com
Page 8
Please note: This document is designed for double-sided printing. Intentional blank pages are included for proper alignment.
Page 9
Client Name // Proposal Name Cover Letter Section 1 // Qualifications .............................................................. 9 Section 2 // Project Approach ......................................................... 17 Section 3 // Key Personnel ............................................................. 21 Section 4 // Relevant Experience ................................................... 35 References .................................................................. 49 Section 5 // Cost Proposal ............................................................. 53 Table of Contents
Page 10
Please note: This document is designed for double-sided printing. Intentional blank pages are included for proper alignment.
Page 11
Section 1: Qualifications
Page 12
Please note: This document is designed for double-sided printing. Intentional blank pages are included for proper alignment.
Page 13
SECTION 1: QUALIFICATIONS 9 Town of Granby // On-Call Engineering Services WHAT WE DO Communities Community Development | Public Infrastructure Private Development | Parks & Recreation Transportation Aviation | Bridges | Railroads | Roads | Transit Environmental & Water Environmental Management | Potable Water Storm water | Wastewater FIRM PROFILE Since our founding in 1946, Benesch has specialized in providing civil and structural engineering services to our clients in transportation and infrastructure development. Our founder, Alfred Benesch, brought a collaborative spirit to the practice, encouraging the concept of teamwork coupled with engineering excellence. As the company grew, so did its ability to deliver larger and more complex projects. It didn’t take long for Benesch to become known as a leading engineering firm, capable of tackling clients’ most complex and high-profile projects. When the time came, Benesch sought out like-minded organizations—like Massachusetts’ Purcell Associates—to expand their expertise and skill set. In October 2012, James P. Purcell Associates, Inc., merged with Alfred Benesch & Company. Today, Benesch offers an expanded range of services— guided by the same principles the firm was founded upon many years ago. We practice a wide range of engineering and professional services for public and private clients across the nation. We employ engineers, planners, environmental scientists, construction managers, landscape architects, surveyors and designers that rank among the highest in their professions. Numerous professional accolades have been awarded to our employees for outstanding contributions in their fields. As a company, we are client-focused – dedicated to providing responsive service and committed to quality and engineering excellence. Benesch is ranked among the Top 500 Design Firms in the country by Engineering News-Record. IN-HOUSE SERVICES Accessibility & ADA Compliance | Alternate Delivery | Asset Management & GIS | Bridge Inspection | Civil/Site | CE&I Design | Feasibility/Environmental Studies | Geotechnical | Landscape Architecture | Land Survey | Master Planning | Operational Analysis | Planning | Program Management | Public Finance | Survey | Traffic & Safety | Value Methodology WHAT WE DO VALUE FOCUSED. COMMUNITY MINDED. QUALITY DRIVEN. WHO WE SERVE Airports | Architects | Contractors | Corporations Developers | Federal, State & Local Agencies Railroads | Transit Authorities We routinely tap into our firm’s multidisciplinary expertise to support clients across the country. We turn our nationwide capacity and expertise into high-value solutions for local infrastructure challenges.
Page 14
10 Town of Granby // On-Call Engineering Services SECTION 1: QUALIFICATIONS Our New England offices, with a staff of 77 (45 in CT and 32 in MA), have been in business for over 50 years. Additionally, our Glastonbury Office is only about 30 minutes away—ensuring responsive client service. 1,200 EMPLOYEES | 49 LOCATIONS | 20 STATES 1 TEAM PROJECT SERVICES Our recent municipal work includes the following communities: In addition to our municipal work, we regularly perform design services as on-call consultants for the following: • MassDOT • UConn - Survey; Civil/Structural • CT DCS - Civil/LA/Survey • CTDOT - Bridges and Structures • CTDOT - Value Engineering and Constructability Review Benesch offers the City a comprehensive suite of in-house services for this contract, including: • Athletic Field Design • Civil/Roadway Engineering • Site Development • Structural Engineering • Landscape Architecture • Land Surveying/GIS • Inland Wetland Related Services • Permitting • Bidding and Construction Services • Construction Inspection • Water & Wasterwater • Grant Writing • Bloomfield, CT • Bristol, CT • East Hartford, CT • Greenwich, CT • Hartford, CT • New Britain, CT • New Milford, CT • Newtown, CT • Norwalk, CT • Somers, CT • Stafford, CT • Stamford, CT • Wilton, CT • Winchester, CT • Agawam, MA • Boston, MA • Chelsea, MA • Haverhill, MA • Springfield, MA • West Springfield, MA Work for this project will be performed by our Connecticut Staff. This location provides for responsive client service and stakeholder coordination. Connecticut Office 200 Glastonbury Blvd, Suite 201 Glastonbury, CT 06033 P 860-633-8341 Primary Contact: Will Walter, PE, LEED AP Project Manager P 860-494-4359 E wwalter@benesch.com Benesch Office Granby 30 minutes
Page 15
SECTION 1: QUALIFICATIONS 11 Town of Granby // On-Call Engineering Services Benesch has reviewed the Request for Proposal/Qualifications prepared by the Town of Granby and understands that we may be called on to assist you with a wide variety of services, ranging from feasibility studies to construction administration and/or inspection services. Our New England offices have been in business for over 50 years, during which we have held on-call engineering contracts with municipalities across Connecticut and Massachusetts, including the cities of Hartford, New Britain, Bristol, East Hartford, Enfield, Springfield, and West Springfield. As an on-call engineer for dozens of municipalities across the country, Benesch understands the challenges cities and towns face as they strive to improve the quality of life for their residents. The nature of on-call contracts requires an understanding that assignments may vary widely in size, scope and staffing levels. In turn, we must not only be responsive to these unique characteristics, but knowledgeable of each assignment’s specific needs. Being quick, nimble and responsive is Benesch’s key to success. Benesch has the flexibility and expertise to tackle a wide variety of on-call assignments, along with the diversity of in- house services needed for core civil engineering work. Below please find the specific areas of expertise and strengths we bring to the design and engineering services assignment. GENERAL CIVIL & SITE ENGINEERING SERVICES Benesch is well versed in all phases and aspects of general civil engineering and site development, from initial planning and concept through design, bidding and construction. We carefully scope the appropriate number of phases depending on the complexity of the project. As your consultant, we believe in serving as a true partner while anticipating your project needs. As issues arise, we will come to you immediately — not just with the problem, but with at least one well-considered solution. We believe in consistent communication, and our practice is built around client service. Benesch’s Connecticut-based civil engineering group consists of more than 14 professionals, including seven licensed engineers with a combined 150-plus years of experience. We are experts in site design, hydrology, hydraulics, drainage and storm water management, and erosion and sediment control. We are also experts in the following documents/codes: • CT DEEP 2004 Stormwater Quality Manual • CT DEEP 2000 Erosion & Sediment Control Guidelines • ConnDOT Drainage Manual • ADA Requirements ROADWAY ENGINEERING Benesch provides roadway engineering services ranging from spot safety improvements and shoulder widening to full corridor reconstruction. Our Connecticut work includes multi-phase CTDOT roadway projects requiring traffic signal design, geometric corrections and drainage improvements. BENESCH ON-CALL SERVICES
Page 16
12 Town of Granby // On-Call Engineering Services SECTION 1: QUALIFICATIONS We are experienced in coordinating with state and local agencies to advance projects through design and into construction. We understand the desire of municipalities to provide connections via pedestrian and bicycle facilities, as well as the design and permitting process, including the importance of public participation. We are well versed in the requirements that accompany these types of projects when federal or state funding is utilized. Our approach has resulted in successful recent projects in Newtown, Cromwell, New Britain and Hartford. Additionally, we are currently involved in the design of sidewalks and other pedestrian improvements on Route 5 in East Hartford as part of CTDOT CCGP funding. STRUCTURAL ENGINEERING Benesch has an in-house infrastructure group consisting of six Connecticut-licensed professional structural engineers with extensive experience in municipal bridge design. We understand the dynamics that drive local bridge projects, including structural analysis, hydrologic and hydraulic analysis, scour analysis and permitting. We are well versed in the rehabilitation of historic bridges and the associated requirements for maintaining their aesthetic and historic character. We have designed many Connecticut roadway and pedestrian bridges and regularly perform bridge inspections across the state. Our structural group also regularly designs retaining walls, performs building structural assessments and provides building design services. FEASIBILITY STUDIES Benesch regularly prepares conceptual plans and feasibility studies as part of the feasibility portion of projects. We believe these are critical to help clients understand the viability of a project before committing design dollars. We review issues such as traffic, utilities, zoning, permitting and required acquisitions as part of our up-front analyses. We recently completed a feasibility study for the Connecticut Department of Administrative Services in which we analyzed four sites for the potential placement of a state-of-the-art State Forensics Laboratory. The state’s chief architect noted it was “one of the best feasibility reports” he had ever seen. LAND SURVEYING RELATED SERVICES Our survey crews are led by licensed professionals with broad exposure to the various aspects of surveying. Our staff has the depth of knowledge to understand the unique nature of any given project. Benesch’s surveyors consistently work hand-in-hand with our design group (engineers and landscape architects) to provide comprehensive surveys that are useful for design. We regularly perform the following surveys: • A2/T2 site surveys, sufficient for design and permitting • Roadway and sidewalk surveys, including right-of-way determination • Ballfield and park surveys • Preparation of easements – permanent and temporary • ALTA surveys • Flood certificates • Dam surveys • Utility surveys, including ground penetrating radar • Land taking documents • Bridge surveys Our surveyors and engineers collaborate to ensure correctness and completeness of acquisitions for construction.
Page 17
SECTION 1: QUALIFICATIONS 13 Town of Granby // On-Call Engineering Services We are committed to embracing technological advancements in the industry to bring further economic benefits to our clients. Our GIS staff integrates data from a variety of sources, projecting, digitizing and editing GIS and CAD data. Blending new technology with an understanding of traditional basics allows our survey staff to provide clients with an efficient product. LANDSCAPE ARCHITECTURE RELATED SERVICES Benesch’s landscape architecture group works cohesively with our engineers to provide comprehensive design and placemaking. We believe very strongly in the concept of in- tegrated design, where engineers and landscape architects work hand-in-hand from the very beginning of the project to provide comprehensive designs that meet aesthetic, place- making, functional and usable site requirements. Benesch’s collaboration on City improvements will integrate thoughtful, technically feasible strategies for the development of landscape space. The Benesch team has a long-standing record of working with local communities and public clients to deliver feasible and sustainable solutions for improvements to parks, historic districts and streets. Our project strategy is inclusive, grounded in experience and sound knowledge of landscape design and construction, maintenance practices and the public process. We listen, respond and engage — not only with our clients, but with all stakeholders within a project. This results in a creative, problem-solving exploration that recognizes issues and ultimately produces a clear direction for improvements. INLAND WETLAND RELATED SERVICES Wetland permitting is a regular part of our projects, so our en- gineers thoroughly understand municipal wetlands regulations and the application of such as they relate to site constraints and design. Our team routinely prepares applications and presents municipal wetlands conditions, including wetland applications that require state and federal permitting. PERMITTING Local, state and federal permitting are a part of most of our projects. We consistently guide projects through this process and regularly interact with Zoning Boards of Appeal, Inland Wetland Commissions, Planning & Zoning Commissions, local advisory boards, CTDOT, CT DEEP, CT DPH and the ACOE. We believe in engaging the regulatory agencies at an early design stage, in order to address obvious concerns or issues. As part of our response to agency comments, we prepare comprehensive written responses that directly correlate to plan modifications. COST ESTIMATING Benesch utilizes an in-house cost database in conjunction with multiple sources, including CTDOT-published data, to produce cost estimates. We also utilize our wide network of contractor and construction-manager connections to supplement the cost databases. In addition, we prepare accurate cost estimates and do so as a regular part of our projects. BIDDING & CONSTRUCTION RELATED SERVICES We provide bidding and construction services on most of our projects. We are very comfortable working with contractors and believe it is critical to respond quickly to RFIs, shop drawing submittals, field issues in order to keep projects moving through construction. RESIDENT ENGINEERING SERVICES We have the capability to provide construction inspection, administration and testing services. We are familiar with CTDOT’s four-book system and are currently providing resident engineering services on a CTDOT-funded sidewalk project in Norwich, CT. In addition, we are currently providing inspection services for projects in Stafford and Wilton. TAKING A VALUE ENGINEERING APPROACH Value engineering (VE) is in our DNA. From the first sketch to the final plan, our team is always asking: is there a smarter way to do this? Several team members hold Value Methodology Associate (VMA) credentials or regularly participate in VE workshops, including proposed Project Manager Ryan Scrittorale. The result? Designs that work harder for the City of Norwich’s budget.
Page 18
14 Town of Granby // On-Call Engineering Services SECTION 1: QUALIFICATIONS Benesch confirms its ability to begin work on any assigned tasks within 10 days of notification from the City. Milestone Submittals Negotiations and/or Approval of Price Proposal & Work Plan Price Proposed & Work Plan Submittal Scope Verification Meeting Identify Scope/Schedule Changes Submit Monthly Progress Reports Monitor Project Budget & Schedule On-Call Design Project Process Identify Design Team and Conduct Internal Scope Review Request for Design Services Project Assignment Identified Perform Design & Develop PlansQA/QC Request for Design Services Immediately following a design request, Benesch’s project manager will set up a meeting or phone conference with City staff to discuss project scope, schedule and staff availability. Key Steps in the On-Call Design Process Scope Verification Meeting Once the appropriate staff have been identified by the Program Manager, the carefully selected project team meets to verify scope. Price Proposal & Work Plan Submittal Once an agreed-upon budget, scope and schedule are confirmed, each assignment is tracked independently. Perform Design & Develop Plans As design and plan development begins, Benesch will coordinate all aspects of the project under City’s direction or its assigned project manager. PROJECT APPROACH/DELIVERY The chart and brief summaries below outline Benesch’s simple, yet effective, approach to managing on-call project services. This approach also allows us to track numerous concurrent projects and maintain schedules with efficiency and control. We can state with confidence our ability to meet contract, time and budget requirements agreed upon for each assignment. EMERGENCY RESPONSE When time is critical, Benesch moves fast. Urgent situations demand a different mindset than traditional engineering, and our team is built for it. We have mobilized quickly on multiple occasions to assess conditions, develop solutions and restore safety when it mattered most. The City of Norwich can count on us to be there when it matters. For example, following record snowfalls several winters ago, Benesch deployed seven structural engineers to UConn’s Storrs campus within 24 hours of Notice-to- Proceed. The team evaluated roof conditions under historic snow loads, performed structural analysis of roof framing capacity, and coordinated with UConn Facilities to prioritize snow removal. More than 40 structures were assessed in a single week. Benesch structural engineer conducting a roof condition assessment during record snowfall.
Page 19
Section 2: Project Approach
Page 20
Please note: This document is designed for double-sided printing. Intentional blank pages are included for proper alignment.
Page 21
17 SECTION 2: PROJECT APPROACH Town of Granby // On-Call Engineering Services ATHLETIC FIELDS PROJECT APPROACH A PHASED APPROACH TO COMPLETING THE GRANBY FACILITIES Benesch’s approach to the Granby Fields Improvements is grounded in our extensive experience delivering athletic projects for many municipalities. Our work is structured to complete the final design while protecting schedule, budget, and community relationships. This approach reflects how Benesch has successfully executed prior projects—including feasibility, design, permitting, and construction support—by combining disciplined phasing with early technical validation and continuous coordination with stakeholders. Throughout the project, Benesch will work in close integration with Silver Petrucelli + Associates (SPA) to deliver a unified site, athletic, and architectural solution. PHASE 1 — PROJECT INITIATION & PRE-DESIGN CONFIRMATION Following contract award, Benesch will initiate the project with a structured pre-design effort focused on confirming assumptions, validating site constraints, and aligning the team on delivery strategy. Work in this phase will include a formal project kickoff meeting with the stakeholder and the consultant team to confirm scope, communication protocols, and decision authority. Benesch will establish biweekly project management meetings, which will continue throughout the duration of the project, providing a consistent forum for coordination, issue resolution, and schedule control. During this period, Benesch will review the program and available survey and utility information. Site reconnaissance will be performed to verify existing conditions, utility easements, access constraints, and athletic field fit relative to governing body standards. A critical outcome of this phase will be confirmation of the procurement path for athletic field systems, including whether the project will proceed through a traditional competitive bid or utilize the CT CREC Cooperative Purchasing Marketplace. PHASE 2 — DESIGN DEVELOPMENT Traditional Competitive Bid Path Under a conventional Design-Bid-Build delivery, Benesch will advance the project through Design Development. During this phase, the design will be developed to clearly define field layouts, grading, drainage, lighting, circulation, and site utilities while maintaining flexibility for competitive bidding. Design efforts will focus on establishing durable, maintainable athletic surfaces; protecting the long-term performance of synthetic turf through appropriate base and stormwater design; and coordinating pedestrian access, accessibility, and security. Lighting design will include photometric analysis to manage spill and glare at the site perimeter and along adjacent public pathways. Cost alignment will be managed through continuous budget reconciliation and identification of bid alternates to maintain procurement flexibility. CREC COOPERATIVE PURCHASING PATH (PRE- SELECTED VENDOR) If the town elects to utilize the CREC Cooperative Purchasing Marketplace, Schematic Design and Design Development will be consolidated into a single Design Development phase, consistent with allowances for pre-selected systems. In this scenario, Benesch will work directly with the selected manufacturer (AstroTurf, Shaw, or FieldTurf) to integrate system- specific requirements for turf, base construction, drainage, and warranties. This approach reduces procurement risk, accelerates decision-making, and allows the design team to focus on constructability and coordination rather than redundant specification development. Importantly, this delivery path does not reduce permitting or documentation rigor. PHASE 3 — PERMITTING & REGULATORY COORDINATION (PARALLEL WITH DESIGN) Permitting and regulatory coordination will proceed in parallel with design to avoid downstream delays. Benesch will lead this effort on behalf of the town, coordinating with all Authorities having jurisdiction. This phase will include coordination with local land use agencies as required, including Planning and Zoning and the Inland Wetlands and Watercourses Commission. Even where work is anticipated to be outside regulated resources, Benesch will prepare documentation necessary to obtain formal jurisdictional determinations.
Page 22
18 Town of Granby // On-Call Engineering Services SECTION 2: PROJECT APPROACH Use of a CREC cooperative contract will not bypass any permitting or approval requirements; Benesch will remain responsible for integrating vendor systems into a fully permitted project. PHASE 4 — CONSTRUCTION DOCUMENTS Following completion of Design Development and permitting coordination, Benesch will prepare Construction Documents suitable for public bidding or cooperative procurement. Documents will be developed with an emphasis on clarity, constructability, and phasing to support uninterrupted campus operations. Deliverables will include coordinated civil, athletic, and site plans; detailed turf system sections aligned with the selected procurement path; grading, drainage, lighting, and utility documentation; and clear bid alternates where applicable. This phase will culminate in the town’s review and authorization to bid. PHASE 5 — PROCUREMENT & BIDDING Benesch will support the town throughout the bidding or procurement process by responding to bidder questions, preparing addenda, and assisting with bid evaluation and constructability review. Our role during this phase is to protect the integrity of the documents and confirm alignment between the design intent and contractor proposals. PHASE 6 — CONSTRUCTION ADMINISTRATION During construction, Benesch will provide construction administration services focused on quality control, schedule adherence, and coordination among all parties. Our approach is informed by direct experience delivering athletic facilities under tight seasonal constraints. At Southern Connecticut State University’s Jess Dow Field, Benesch surveyed, designed, and supported construction of a new track and field within a minimal off-season window, carefully phasing work adjacent to Special Olympics programming and maintaining uninterrupted athletic operations. That same disciplined approach—tight sequencing, frequent communication, and rapid issue resolution—will be applied in Granby. ONGOING COORDINATION & PROJECT GOVERNANCE Throughout all phases, Benesch will maintain biweekly project meetings, clear documentation of decisions and action items, and continuous coordination with SPA, DAS, and CTECS. This structure ensures transparency, accountability, and steady progress from project initiation through closeout.
Page 23
Section 3: Key Personnel
Page 24
Please note: This document is designed for double-sided printing. Intentional blank pages are included for proper alignment.
Page 25
21 SECTION 3: KEY PERSONNEL Town of Granby // On-Call Engineering Services ARCHITECTURE/BUILDING David Stein, AIA (SPA)* Dean Petrucelli, AIA (SPA) Silver Petrucelli + Associates (SPA) SP+A is an award-winning, integrated architecture, engineering, and interior design firm recognized for its positive community impact. The firm’s expertise spans historic preservation, state-of-the-art learning facilities, modernized workspaces, and public safety and civic projects such as libraries, senior/community centers, and municipal buildings. SP+A delivers new construction, renovate-as-new, expansions, repairs, code conformance improvements, HVAC and electrical system design, and window, door, and roof replacements. Advanced technologies are fully integrated in-house to enhance design and construction, with a strong commitment to sustainability and LEED-inspired, resource-efficient solutions. Over three decades, SP+A has grown organically, building a dedicated team and earning repeat business from clients who value their design excellence and innovative, process-driven approach. TOWN OF GRANBY PROJECT MANAGER Will Walter, PE* STRUCTURAL ENGINEERING Mark Habek, PE, VMA* Task Leader Slawomir “Swavek” Lachcik, PE Subal Das, PE Charles Sorensen, PE Alyssa Bisi, EIT CONSTRUCTION ADMINISTRATION, INSPECTION & MANAGEMENT David Hines, PE* Task Leader J. Matthew Remchuk David Locke, PE James Murcia, EIT LAND SURVEYING David Caricchio, PLS* Task Leader Lucas Bell, LSIT Paul Charette Nick Caricchio LANDSCAPE ARCHITECTURE Ryan Deane, ASLA, PLA* Task Leader Thomas Swale, PLA Andrew Woodward, PLA CIVIL/SITE/LAND DEVELOPMENT Nancy Levesque, PE, CFM* Task Leader Ryan Scrittorale, PE Greg Lachcik Delaney Pilotte Connor McNamara, EIT GRANT WRITING Freddy Vasquez, AICP Project Manager Will Walter, PE, LEED AP has 25 years of experience in various facets of survey and site/civil design. He will lead a dedicated in-house team of professionals with decades of municipal design experience. Will regularly manages complex, multi-disciplined projects, including design and oversight of the entire permitting and design process associated with land development and roadway reconstruction. In addition, he is experienced in the provision of construction inspection and erosion and sediment inspection services, having performed this task on numerous development projects. As a Windsor resident and user of Salmon Park, Mr. Walter will have the park and the Town of Granby in his best interest throughout the entirety of the project. WASTERWATER COLLECTION SYSTEMS Stephen Roth, PE, CAMP* Task Leader Nancy Levesque, PE Ryan Scrittorale, PE Connor McNamara, EIT WATER DISTRIBUTION SYSTEMS Michael Peleschak, PE* Task Leader AJ Toloza, PE Ryan Scrittorale, PE Nancy Levesque, PE Rocco Cirilli M/E/P ENGINEERING Robert Banning, PE (SPA)* Kenneth Eldridge, PE (SPA) Subconsultant
Page 26
22 Town of Granby // On-Call Engineering Services SECTION 3: KEY PERSONNEL William Walter, PE, LEED AP Role: Project Manager Classification: Project Manager Education Bachelor of Science - Civil Engineering Worcester Polytechnic Institute Years of Experience: 25 Registrations and Certifications Professional Engineer: CT (#23146); RI (#12234); MA (#54033); NY (#103192) LEED® Accredited Professional Will leads the Site Development Group of Benesch’s Glastonbury office. He is well versed in all aspects of land development and he brings over 25 years of design and project management experience for public and private clients to his work. Key areas of expertise include planning, permitting, site demolition, grading and drainage, utilities, erosion & sediment control, and construction phase services. He is experienced in total site design, meeting criteria and performance standards for numerous local, state, and federal guidelines, including requirements for: local zoning and inland wetlands; state DOT stormwater design; state DEEP stormwater quality and erosion and sediment control; federal NPDES; and LEED requirements. Will regularly manages complex, multi-disciplined projects, including design and oversight of the entire permitting and design process associated with land development and roadway reconstruction. In addition, he is experienced in the provision of construction inspection and erosion and sediment inspection services, having performed this task on numerous development projects. Friends Academy Synthetic Turf Field – Locust Valley, NY Project Manager: Oversaw the design, permitting and construction oversight of erosion control and drainage associated with a multi-use synthetic turf field. The drainage overcame the challenge of unsuitable soils and no natural drainage path through the use of a robust stone reservoir under the turf, a perimeter collector trench, and conveyance facilities. Pingry School Synthetic Turf Field – Millburn, NJ Project Manager: Managed the design, permitting and construction oversight of erosion control and drainage associated with a natural grass, multi-use conversion to synthetic turf. The field was partially located in a flood plain and also required extensive underground detention to meet New Jersey DEP requirements. Bowen Field at Beaver Pond Park – New Haven, CT Project Manager: Improvements to Bowen Field in New Haven included a new, synthetic turf field with overlapping soccer and football, an 8-lane, 400 meter synthetic running track, renovated western grandstands, new athletic field lights, and other appurtenances. Existing maintenance buildings were evaluated for potential renovation and building additions to complement the athletic use of an adjacent high school. O’Brien Stadium/Windsor High School Athletic Facility – Windsor, CT Civil Engineer: Provided design and construction oversight of renovations to the athletic facility at the O’Brien Stadium Field. The fully renovated facility includes a new competitive running track for track and field events, an all-weather, multi-purpose, synthetic-turf field, a natural grass practice football field, a press box, home and away bleachers, a multi-sport scoreboard, walkways, fencing, and miscellaneous improvements to the site. Worked through programming with the Athletic Director and Town stakeholders, local permitting, and a series of Town meetings ultimately gaining approval of the project funding at a Town-wide vote. LP Wilson Community Center Fields – Windsor, CT Project Manager for the design of approximately 11 acres of natural grass field renovation. The existing fields at LP Wilson Community Center were removed due to water issues and poor playability. The project redesign incorporated soil renovation, grading, drainage and groundwater-lowering measures to successfully provide soccer, field hockey and baseball/ softball fields for the community. East Hartford On-Call Contract for Surveying and Civil Engineering Project Manager for the currently on-going on-call contract, which includes oversight of the management and design of assignments, coordination with the City’s project manager, and adherence to City standards and requirements. Recent projects include the Route 5/502 Intermodal Facilities Improvements and the Pitkin Street Survey. Will’s extensive athletic field experience also includes: • Loomis Chaffee Field Hockey Field – Windsor, CT • Wesleyan Smith Field Turf Renovation – Middletown, CT • Crosby High School Athletic Facility – Waterbury, CT • Bowen Field at Beaver Pond Park – New Haven, CT • Bunnell High School Track Rehabilitation – Stratford, CT • New Milford High School Synthetic Turf Fields – New Milford, CT
Page 27
23 SECTION 3: KEY PERSONNEL Town of Granby // On-Call Engineering Services Education BS, Landscape Architecture and Regional Planning - University of Massachusetts, Amherst AS, Environmental Sciences and Human Ecology - Greenfield Community College Years of Experience: 21 Registrations and Certifications Professional Landscape Architect: Connecticut (#1088) Massachusetts (#4371) Maine (#LAR5385) New York (#003002) Rhode Island (#718) Ryan C. Deane, PLA Role: Landscape Architect Task Leader Classification: Chief Engineer Ryan has 20 years of experience in athletic field design, master planning, sustainable design, and construction administration. He has worked on and managed over 20 athletic projects and is intimately familiar with the programming and design necessary for synthetic turf and tennis court projects. Ryan is well-versed in the nuances of synthetic turf, line striping and layout of multi-use fields and tennis court surfacing options. Friends Academy Synthetic Turf Field – Locust Valley, NY Landscape Architect & Project Manager: Responsible for the campus master plan and athletics master plan, which led to the design and documentation for a new multi-purpose, synthetic-turf field, which was integrated into the grounds of the Friends Academy campus. Ryan was responsible for the design and project management. Jess Dow Field Renovations – Southern Connecticut University Landscape Architect & Project Manager: Benesch performed a boundary and topographic survey for the entire stadium. Underground utility location, utility research and field location of all site amendments were also provided. Benesch also performed an evaluation of all hardscape, softscape, stormwater, and utilities on site and prepared a written report documenting the existing conditions of all applicable site items. Benesch is currently providing civil-related design and permitting services, including erosion control, stormwater and utility design. Pingry School Synthetic Turf Field – Millburn, NJ Landscape Architect & Project Manager: New synthetic-turf field for lower school students in close proximity to wetlands. Ryan provided the design and project management for the synthetic field, as well as construction administrative services. Bulkeley High School Renovation – Hartford, CT Landscape Architect: As part of a complete 20-acre renovate-as-new project, the design included replacement of an existing track and natural grass field with a new track and synthetic turf field. Additionally, this project included the replacement of existing tennis courts. Greenwich Country Day School Synthetic Turf Fields – Greenwich, CT Landscape Architect & Project Manager: Design of campus included siting of four new buildings, campus loop road, parking, a wastewater treatment facility and two synthetic-turf fields. A multi-use, synthetic-turf field for the Stanwich School was constructed in 2011 and required substantial earthwork and permitting. The second phase of campus development included a synthetic football field with a scoreboard, uprights and lacrosse netting. This field was substantially completed in 2019. Nonnewaug High School – Woodbury, CT Landscape Architect & Project Manager: Project included sitework scope of a new synthetic-turf, multi-purpose field; resurfaced, synthetic track; renovation of all natural-turf baseball, softball, soccer and field hockey fields, post-tension tennis courts, and various other campus improvements. Ryan was responsible for the design and documentation of the athletic elements, as well as project management. CREC Public Safety Academy – Enfield, CT Landscape Architect: As part of a new school facility, the project provided a new, multi- purpose, synthetic-turf field, and a 6-lane synthetic running track. The project included new drainage, and striping for field events.
Page 28
24 Town of Granby // On-Call Engineering Services SECTION 3: KEY PERSONNEL Education BS, Civil Engineering - University of Connecticut Years of Experience: 31 Registrations and Certifications Professional Engineer: CT (#0022165) Certified Floodplain Manager (CFM) Professional Affiliations American Public Works Association Association of State Floodplain Managers Nancy Levesque, PE, CFM Role: Civil, Site and Land Development Task Leader Classification: Chief Engineer Nancy has more than 30 years of civil engineering experience supporting municipal, institutional, and site development projects. Her expertise includes site/civil design, stormwater management, drainage, permitting, and quality assurance for complex public- sector projects. Nancy has extensive experience reviewing plans and specifications for completeness, constructability, and regulatory compliance, with particular strength in projects involving school campuses, residential developments, utility coordination, access and circulation improvements, and site amenities. Her background as a former city engineer for Bristol, CT, gives her a practical understanding of municipal review processes, public infrastructure needs, and implementation challenges. On this contract, Nancy will support assignments involving land improvements, site/civil engineering, drainage and stormwater systems, and quality review. Flood Protection System Projects – West Springfield, MA Senior Civil Engineer: Multiple projects related to the City’s Flood Protection System (FPS). The projects are being performed as part of Benesch’s on-call contract with the City, and specifically to maintain compliance with the Army Corps of Engineers (ACOE) FPS requirements. Projects included Quarterly Inspections, Annual Maintenance Bid Set, CCTV Inspections, Concrete Wall Repair Bid Set, Relief Well Inspection and Monitoring. Elmwood Community Center, Design – West Hartford, CT Senior Civil Engineer: Benesch is leading the site design for the Elmwood Community Center in West Hartford, aiming for LEED Gold certification. The project integrates sustainable design with community engagement, featuring storm water systems, rain harvesting, and accessibility focused amenities. Situated in Beachland Park, the center will serve all age groups. Benesch’s comprehensive services include civil engineering, traffic engineering, and landscape architecture, ensuring compliance with environmental regulations and local permitting requirements. North Main Street Streetscapes – Bristol, CT QA Reviewer: This project advances Bristol’s revitalization by building on initial efforts such as right-of-way and easement surveys, conflict identification, and a Traffic Impact Study that included turning movement, pedestrian, and traffic counts at four intersections, as well as capacity analyses for current and future conditions. Benesch is developing plans and details for roadway and streetscape, drainage and utilities, pavement markings and signage, lighting, maintenance and protection of traffic, landscaping, quantity takeoffs, and cost estimates. A Public Outreach Program is also being developed to incorporate stakeholder concerns into the design. Nancy provides quality assurance reviews. Site design for Fire Station #3 – Bristol, CT Senior Civil Engineer for the design of a new fire station, which replaced the inadequate existing fire station servicing a local neighborhood in Bristol, Connecticut. The new fire station expanded fire services and provided other services to the community. Site design included demolition, erosion control, phasing, site layout, site circulation/parking, grading/ drainage, utilities, landscaping and lighting. The project required site plan approval. Site design for a New Firehouse – Norfolk, CT Senior Civil Engineer for the design of a new fire station, located at the same site as the existing, dilapidated and inadequate fire station in Norfolk, Connecticut. Site design included demolition, erosion control, phasing, site layout, site circulation/parking, grading/drainage, utilities, landscaping and lighting. The project required local inland wetlands and site plan approval permits.
Page 29
25 SECTION 3: KEY PERSONNEL Town of Granby // On-Call Engineering Services Education Associate of Science, Architectural and Civil Drafting and Design, Porter and Chester Institute Years of Experience: 43 Registrations and Certifications Professional Land Surveyor: Connecticut (#LSX.0070036); Maine (2265) Field Survey Technology Equipment • Trimble S6 Robotic Total Station • Trimble G.P.S. R10 GNSS Receiver • Civil 3D 2014 As Senior Surveyor in Benesch’s Glastonbury, Connecticut Office, Dave serves as project manager for all of our surveying projects. A licensed professional Land Surveyor in Connecticut and Maine, he has over 40 years’ experience in the field. Along with providing client liaison and overseeing the survey team, Dave’s expertise encompasses ALTA/ACSM, bathymetric, boundary, record, topographic, landfill, utility, wetlands location, and G.P.S. surveys; aerial photogrammetric control; construction layout; condominium plans: environmental land use restriction plans (ELUR); easement plans; land records research; legal descriptions, and right-of-way and taking plans. He is proficient in all phases of field and office survey work as well as with survey instrumentation, G.P.S. equipment, robotic total station, data collectors, and with Civil 3D software. Annie Fisher Baseball, Football and Soccer Development Plan – Hartford, CT Senior Surveyor: Benesch services included a Boundary and Topographic Survey of the existing natural grass football field and grading and drainage improvements to support the new synthetic turf baseball, football and soccer complex with additional site features. Local permitting included Floodplain, Inland Wetlands and Planning & Zoning commission review. Dave provided oversight of all surveying efforts associated with the project. Blackham School Baseball Field Renovation – Bridgeport, CT Senior Surveyor: FIELDS, Inc.—working in conjunction with Baseball Hall of Famer, Cal Ripken Jr’s., Foundation—retained Benesch to provide engineering and survey services for this urban athletic facility. Services included boundary and Topographic survey of existing three field complex, grading and drainage improvements to support the new synthetic fields and site features, and local permitting. Dave oversaw all surveying efforts associated with the project. Hyland Park Baseball and Soccer Development Plan – Hartford, CT Senior Surveyor: FIELDS, Inc.—working in conjunction with Baseball Hall of Famer, Cal Ripken Jr’s., Foundation—retained Benesch to provide engineering and survey services for this urban athletic facility. Services included Boundary and Topographic Survey of existing natural baseball field, grading and drainage improvements to support the new synthetic turf baseball and soccer field with additional site features, as well as local permitting. Dave oversaw all surveying efforts associated with the project. Luis Munoz Marin School Baseball and Football Field Renovation – Bridgeport, CT Senior Surveyor: Dave oversaw all surveying efforts associated with the project. Survey services included Boundary Survey, Lot Consolidation Plan and Topographic Survey of existing multi-use grass fields. Civil services included grading and drainage improvements to support the new synthetic baseball and football fields with additional site features, as well as, local permitting. Trinity College Survey & Design Services – Hartford, CT Senior Surveyor: Dave oversaw all surveying activities on 40± acres of Trinity College’s campus. Along with providing critical information for individual design projects, the surveys respond to the College’s intention to create a campus-wide map. Complete, on-the-ground field surveys were conducted along Ferris Road and Crescent Street; the site of the new Music Hall; tennis courts; and athletic fields and include the following systems: steam condensate; 13.8 kV electrical power; 4160 Volt Emergency Power; domestic water; fire water; chilled water; sanitary sewer; storm drainage; natural gas; telephone/data; security cameras; and blue lights. Also provided survey with underground utility mark-out to create a 3D representation of the existing underground utilities as part of the Bookstore Enabling project. David A. Caricchio, PLS Role: Survey Task Leader Classification: Technician Support
Page 30
26 Town of Granby // On-Call Engineering Services SECTION 3: KEY PERSONNEL Mark has 14 years of structural engineering experience and currently serves as the project manager for bridge projects in our Glastonbury office. He has been involved in design and analysis of steel, timber, and reinforced concrete structural framing elements. Mark also works on CTDOT projects associated with the State’s List Bridge and Local Bridge programs. Additional expertise includes structural evaluations, facilitating Value Engineering studies, and providing on-call engineering services for state and local agencies. Structural Evaluation, On-Call Engineering Services – East Hartford, CT Designer: Mark provided carport structural evaluation for the town of East Hartford. Mark inspected cold-formed steel structures which supported solar panels, looked for any signs of deterioration or overstressed members due to snow and wind loads, and looked for any impact that the post-construction addition of snow guards had on the cold-formed steel framing members. He noted his findings, designed repairs, and wrote a report on his findings and how the structure should be repaired. Elm Street Structural Assessment, On-Call Engineering Services– Springfield, MA Designer: Mark assisted with the structural assessment of this historic building as part of the city’s renovation and redevelopment efforts. Work included evaluation of representative beams, columns and wall sections under code-specified loading conditions for both existing and proposed use, covering life safety and property protection considerations. Case Avenue Bridge Rehabilitation over the Mad River – Winchester, CT Lead Project Engineer/Assistant Inspector: The rehabilitation of this single-span, steel multi- girder structure includes full deck replacement, repainting of the superstructure, roadway profile adjustments and installation of new sidewalks on either side. New contemporary three-rail tube bridge railings and decorative streetlights were installed to coordinate with the downtown Winchester streetscape. Mark was responsible for bridge design, bridge rehabilitation plans, construction cost estimates, and design services during construction. He also assisted with inspection and oversight during construction. West Cedar Street Bridge #2 over Five Mile River – Norwalk, CT Project Manager/Structural Engineer: Benesch is designing a full replacement for this historic single-span closed-spandrel masonry arch bridge with a cantilevered sidewalk. The new West Cedar Street Bridge #2 will widen the roadway, adding shoulders and sidewalks to accommodate pedestrians on the main structure. A separate standalone pedestrian bridge will provide pedestrian access throughout construction. Mark was responsible for bridge design, bridge replacement plans, construction cost estimates, and environmental permitting services. Construction Inspection, Sound Beach Avenue over Cider Mill Brook – Greenwich, CT Assistant Inspector: Benesch provided construction inspection services for this LOTCIP-funded bridge replacement project. Mark assisted with inspection and oversight in accordance with the CTDOT’s Construction Manual guidelines. Middletown Municipal Parking Garage Improvements - Middletown, CT Designer: Benesch conducted a Structural Condition Survey of the existing municipal parking garage and prepared a report of findings in 2010. No significant maintenance was performed on the structure between 2010-2014, resulting in the deterioration of the parking deck. Benesch responded to the City’s request for services to upgrade these areas in 2014 by providing design plans and cost estimates for several project alternates, and construction administration and inspection services for the garage’s repair. Mark provided structural evaluation for this project, inspecting the wearing surface and concrete deck on the structure, as well as the concrete columns and beams supporting the garage. He also provided design repair details for the deteriorated garage, along with drawings and details showing the deteriorated areas and how they should be repaired. Mark Habek, PE, VMA Role: Structural Task Leader Classification: Chief Engineer Education BS, Civil Engineering - Northeastern University Years of Experience: 14 Registrations and Certifications Professional Engineer: CT (#0031019) SAVE International Value Methodology Associate (VMA) AMTRAK Certified Safety Inspector Professional Affiliations American Council of Engineering Companies Awards/Recognition ACEC 2023 Emerging Leader of the Year
Page 31
27 SECTION 3: KEY PERSONNEL Town of Granby // On-Call Engineering Services Dave brings significant experience in structural design, construction management and inspection, and infrastructure inspection to his work. His expertise includes list bridge and federal and local projects under CTDOT, ranging from small culverts to large multi-span highway bridges. He has performed structural calculations and design work, detailed new and rehabilitated bridges in AutoCAD and MicroStation, and has extensive estimating experience, including using Estimator. In the capacity of construction inspection, David has served in roles culminating at resident engineer and chief construction inspector on a variety of infrastructure projects in Connecticut and Massachusetts, with clients ranging from local municipalities to CTDOT, CAA and DCS, most recently as a chief inspector on a nearly $100M Design-Build bridge replacement and highway improvement project over MNRR in one of the most heavily traveled portions of the state, both for vehicles and commuter rail. New London Turnpike Complete Streets – New London, CT Chief Inspector for this Benesch project incorporating new sidewalks, bicycle lanes and pedestrian improvements along New London Turnpike from Town Street to Salem Turnpike (Route 82) for a total project length of approximately 12,825 feet. The scope also includes restriping pavement markings, railroad at-grade crossing improvements, and minor drainage improvements. David is providing construction inspection services. Bridge Preservation Project – Litchfield, CT Chief Inspector for the preservation of Bridge Nos. 05181, 05182, 05183 and 06167 in Litchfield, CT, one of the first bridge preservation projects funded under the federal Local Bridge Program. Responsibilities included managing the CTDOT four-book system, materials testing coordination, quantity computations, record keeping, change order processing, field supervision of the contractor and subcontractors, progress meetings and reports for the town and CTDOT, daily work reports, schedule coordination, estimate compiling and stakeholder meeting administration. State of CT Renovations to Lot B and Additional Parking, Manchester Community College – Manchester, CT Senior Inspector for this Connecticut Department of Construction Services (CTDCS) project, replacing a 13-acre parking lot, cutting a new roadway through woodland, and performing extensive new drainage and sidewalk construction. Oversaw the day-to-day field work, checked for plan conformance and quality control; supervised junior inspectors and testing personnel, and maintained detailed records of the work being performed; coordinated with the Project Engineer and Project Manager to keep everyone apprised of progress and acted as the first line of defense for field and construction issues. City of Springfield Tornado Damage Infrastructure Repair Project – Springfield, MA Construction Inspector for this infrastructure project, consisting of new sidewalks, ADA ramps, curbing and pavement restoration. Responsibilities included record keeping, managing pay requisitions, scheduling, and overall quality control and oversight of workforces. Connecticut River Dike Improvements – West Springfield, MA Construction Inspector for the fast-tracked installation of over 50 relief wells for the Town of West Springfield and the Army Corps of Engineers. Responsibilities include record keeping and inspection. David Hines, PE Role: Construction Inspection Task Leader Classification: Chief Engineer Education M Eng, Civil Engineering, University of Hartford BS, Civil Engineering, Syracuse University Years of Experience: 20 Professional Licenses/ Registrations Professional Engineer: CT (#28369) NETTCP HMA Paving Inspector #3715 NETTCP Soils & Aggregate Inspector #2104 NETTCP Concrete Inspector #2041 ACI Concrete Field-Testing Tech Grade 1 #02216769 ACI Troubleshooting Concrete Construction SCM-17(08) OSHA 40HR HAZWOPER, 2019 OSHA 8HR HAZWOPER Refresher, 2025 OSHA 10HR Construction Safety & Health, 2015 OSHA Confined Space, 2009 American Traffic Safety Services Association (ATSSA) Traffic Control Supervisor
Page 32
28 Town of Granby // On-Call Engineering Services SECTION 3: KEY PERSONNEL Mr. Roth has over 23 years of experience as a project manager and design engineer on wastewater projects involving sanitary sewers, wastewater treatment, pumping and storage. Some of his first projects included construction inspection services for the Mill Creek Interceptor Sewer in Johnson County and the Piper Creek Interceptor Sewer in Wyandotte County. Both of these projects built his solid foundation in the principles of sewer construction, greatly influencing his design career. Past projects include new sewer construction, sewer modeling and rehabilitation to lift stations and treatment plants. Mr. Roth’s wastewater experience includes new sewer construction, sewer modeling and rehabilitation, lift stations and treatment. Many of these projects included an in-depth analysis of existing infrastructure with an emphasis on proposing multiple design solutions to reach the most effective solution for his clients. • Unified Government of Wyandotte County and Kansas City, KS - Edgewood Interceptor • City of McPherson, KS - Centennial Phase I/II Interceptor Sewers • Unified Government of Wyandotte County and Kansas City, KS - Jersey Creek Inflow/ Infiltration (I&I) Study • City of McPherson, KS - Lift Station No. 4 Replacement • Unified Government of Wyandotte County and Kansas City, KS - WWTP No. 20 Scum Pump Replacement • Unified Government of Wyandotte County and Kansas City, KS - Kaw Point WWTP Sludge Pump Replacement Unified Government of Wyandotte County and Kansas City - CID Pump Station & Force Main Rehab and Septage Receiving Station Project Manager: The project involved rehabilitating Pump Station No. 2 serving the Central Industrial District, including upgrades to the pump station, septage receiving station, and approximately 1,475 linear feet of 24-inch cast-iron force main. The work addressed reliability concerns, modernized aging infrastructure, and improved operational efficiency while maintaining service to a critical combined sewer area. 12th and Mill Street Flood Pump Stations - City of Kansas City, KS Project Manager: Included two flood pump stations in Kansas City, Kansas. The main focus of the project was to increase the capacity of the station as much as possible while still utilizing as much of the existing structure as possible. As a result, Benesch replaced the existing dry pit pumps with vertical turbine mixed flow pumps in a new wet pit. This modification resulted in a four-fold increase in pumping capacity. Pump Station No. 2 Rehabilitation - City of Kansas City, KS Project Manager: Performed a complete rehabilitation of Pump Station No. 2 (PS2) including new pumps, motors, controls and electrical components. To allow this 12 MGD pump station to be out of service throughout the construction period, a bypass pumping plan had to be developed. The solution that was developed included a combination of using the pump station wetwell, nearby combined sewers and a flood pump station to convey the sewerage safely to the nearby Kaw Point Treatment Plant. The combined sewers allowed the design team to minimize pumping costs, disturbance to traffic and maintenance during the pump station shutdown period. Sycamore Underpass Stormwater Pump Station - City of Grand Island, NE Quality Control: Steve investigated rehabilitation/replacement options for the existing Sycamore Street Stormwater Pump Station. A new pump station was designed adjacent to the existing station that would place the equipment most in need of servicing aboveground, providing better access for maintenance. Stephen Roth, PE, CAMP Role: Wastewater Collection Systems Task Leader Classification: Chief Engineer Education BS, Civil Engineering, University of Kansas Years of Experience: 29 Registrations and Certifications Professional Engineer: KS (#16797); MO (# 2005000037); NC (#43401) Certified Asset Management Professional (CAMP) Certificate in Asset Management Planning, IPWEA Professional Affiliations American Water Works Association – Kansas The American Council of Engineering Companies of Kansas The American Council of Engineering Companies of Missouri
Page 33
29 SECTION 3: KEY PERSONNEL Town of Granby // On-Call Engineering Services Michael Peleschak is a Project Manager with more than 26 years of experience specializing in drinking water infrastructure planning, design, and construction for municipal water systems and authorities. His experience includes the design and rehabilitation of water treatment facilities, water storage tanks, transmission and distribution systems, and system-wide water supply planning studies. Mike has extensive experience assisting municipalities with regulatory compliance, funding programs, and infrastructure implementation through agencies such as PENNVEST, PADEP, and federal funding programs. He has successfully guided numerous water infrastructure projects from planning and feasibility analysis through final design, permitting, and construction. Mahanoy Township Authority Water Distribution Upgrades, Schuylkill County, PA Project Engineer: Design of water mains (approximately 21,000 lf). Design included the connection of 1,300 service connections, 44 fire hydrants, and associated appurtenances. Responsibilities also included the assistance in preparing the funding application, cost estimate, and the preparation of the bidding specifications, as well as the oversight of an entry- level designer. Responsibilities during construction included review of applications for payment and oversight of the jobs. PA DGS, Selinsgrove Center, Water Filtration Plan – Selinsgrove, PA Lead Engineer: Project consists of designing a new potable water filtration facility for the PA DGS Selinsgrove Center. Other elements include ion exchange, chemical addition, new electrical service and SCADA systems. The project also includes replacement of portions of the distribution system piping, 38 fire hydrants and main distribution valves. Responsibilities included overseeing design and permitting activities that involved e-Builder administration and client relations. Mahanoy Business Park, NorthPoint Development – Mahanoy & Ryan Townships, Schuylkill County, PA Project Manager: This project involves constructing three industrial spec buildings totaling 2.5 million square feet for warehousing and distribution on a parcel of land spanning 540 acres. Benesch completed site design, permitting and building layout including stormwater management, erosion and pollution control, PADEP Joint Permit, environmental clearance, wetland mitigation design, and utility coordination. This project also includes the design and permitting of a packaged sewer treatment plant, waterline crossing/extension under Interstate 81, which Mike completed the planning, design, and permitting for the wastewater treatment plant utilizing the Modified Bardenpho Process and the design and permitting for the discharge point located along the headwaters of the high quality Codorus Creek within the Mountain Valley Golf Course. Mike coordinated the design between the developer and the Schuylkill County Municipal Authority who will own and operate the plant. Water Treatment Plant Upgrades – City of Salem, OH Project Manager: The City of Salem’s Water Treatment Plant is a surface water filtration plant with a 4.4 MGD permitted capacity. The system has been taxed with organic loading resulting in disinfection by-products (DBPs) in the finished water that have exceeded regulatory compliance levels. In addition to addressing the organics loading at the treatment plant, Benesch was tasked with identifying other upgrades required to improve operations and maintain compliance over the next 20 years, including the distribution system. To identify the necessary upgrades and evaluate the most cost-effective alternatives, Benesch completed a Project Scoping Study. Benesch utilized the Value Planning process for the study, which is a systematic and logical progression of evaluating alternatives following the SAVE International Value Engineering model. Utility coordination included Youngstown and Southern Railroad (Y&S) for numerous crossings. Michael Peleschak, PE Role: Water Distribution Systems Task Leader Classification: Chief Engineer Education BS, Civil Engineering – Pennsylvania State University Years of Experience: 26 Registrations and Certifications Professional Engineer: PA (#073238); OH (#77011); MT (#49143); OK (#34579); TX (#158398); CO (#0066609) SAVE International Value Engineering Workshop – Module I Professional Affiliations National Society of Professional Engineers American Society of Civil Engineers PA Water Environment Association
Page 34
30 Town of Granby // On-Call Engineering Services SECTION 3: KEY PERSONNEL Education B. Architecture, Pratt Institute A.S. Architectural Engineering, Norwalk State Technical College Summer Program, Rhode Island School of Design Design Certificate, University of Copenhagen Years of Experience: 20 Registrations and Certifications Registered Architect: CT, VT, NY, RI, ME, MA Registered Interior Designer: CT Professional Affiliations Design Juror, Architectural Program, Norwalk Community College American Institute of Architects Connecticut Society of Architects Board of Directors, AIA Connecticut Architectural Department Advisory Board member, Norwalk Community College David Stein, AIA Role: Architecture Task Leader Classification: Chief Engineer David Stein transitioned his 20+ years of design and project management for the firm to leading the firm’s business development efforts. He has extensive experience working with and managing large-scale projects with multidisciplinary teams. He has an excellent record as a team builder and effectively manages client and community relations for design projects. His design and project management background includes educational, municipal and financial projects. David manages the firm’s decades-long relationships with some of the region’s most prominent financial institutions and law firms. Relevant Project Experience: • Senior Center Renovations - Woodbridge • 1928 High School Building Reuse - Farmington • Pierson Park and Locker Rooms Study - Cromwell • Bigelow Senior Center Study & Renovations - Fairfield • New Community/Rec Center – New London • Cultural Community Center Renovations - Woodbridge • Shennecosset Golf Course Maintenance & Restroom Renovations - Groton • Old Train Station Adaptive Reuse - Wallingford • New Senior Center – Colchester • Athletic Brewing Company Renovations – Stratford • Electric Railway Museum Renovations - Branford • Blackstone Memorial Library Renovations and Expansion – Branford • H. Smith Richardson Golf Course New Clubhouse – Fairfield • Community Pool Conceptual Design - Wallingford • Belden Library Renovation and Expansion – Cromwell • Animal Shelter Renovation and Expansion – Woodbridge • Town Hall Office Conversion of Former Middle School - East Haddam • East Side Youth Center Historic Rehabilitative Reuse - Manchester
Page 35
31 SECTION 3: KEY PERSONNEL Town of Granby // On-Call Engineering Services Robert Banning, PE Role: M/E/P Task Leader Classification: Chief Engineer Bob Banning leads SP+A’s electrical and mechanical engineering practice. He reviews construction shop drawings for compliance with the current codes and standards and handles all phases of projects, including client contact, programming, design development, construction document production, consultant coordination, and construction administration. As chief electrical engineer, he manages the electrical engineering team in the preparation of specifications and plans for electrical power systems, utility and emergency back-up power distribution, interior and exterior lighting, fire alarms, security, access control, and instrumentation and control systems, including inspection and evaluation of existing electrical systems. Representative Experience • Old Greenwich ES Renovate as New - Greenwich • Community/Rec Center Expansion - Norwalk • Region 18 HVAC Upgrades - Lyme/Old Lyme • 1928 Building Renovations - Farmington • New Community/Rec Center – New London • High Watch Recovery Center Expansion and Renovation – Kent • Hinsdale Elementary School Renovate as New – Winsted • Emergency Generator Design for WPCA – Fairfield • CT Juvenile Detention Center Interior Renovations – Hamden • Mansfield Middle School Roof PV Design – Mansfield • City Hill Middle School Roof PV Design - Naugatuck • H. Smith Richardson Golf Course New Clubhouse – Fairfield • Region 13 Schools HS and Strong School Pumphouse – Durham • Melissa Jones School Door, Window and Elevator Replacement – Guilford • Enfield High School Renovate as New - Enfield • Memorial School Generator Replacement – Middlefield • Courthouse Elevator Modernization – New Britain • Electric Railway Museum Renovations - Branford • Fort Trumbull Pier Stabilization and Renovation – New London • City-wide Fire Stations Capital Needs Assessments – New Britain • Police Department Relocation and Renovations – East Lyme • City of Hartford On-Call A/E Services • ACES @ Leeder Hill Renovate as New – Hamden • Berlin High School Renovate as New Additions – Berlin • Bergin Housing Complex Intercom Renovations – Waterbury • Police Communication Tower – East Haddam • Field Memorial School Fire Alarm Panel Replacement – Bozrah • New Fire Station #5 & Maintenance Facility – East Hartford • High School Athletic Fields Lighting Engineering Services – Enfield • Multiple School Security Improvements – Waterbury • Northeast School Generator Replacement – Stamford • Police Department Generator Replacement – Bristol • Polson Middle School Photovoltaic Roof System – Madison • M/E/P/FP for New Multi-Level Garage @ St. Francis Hospital – Hartford • University of Connecticut – On-Call MEP/Life Safety & Fire Protection • Wormser Congregate Elderly Housing Emergency Generator & Fireline • Backflow Prevention System – Stamford Education BS, Electrical Engineering - University of Connecticut AS, Nuclear Technology - Thames Valley Technical College With SP+A Since 1993 Registrations and Certifications Professional Engineer: CT, MA
Page 36
Please note: This document is designed for double-sided printing. Intentional blank pages are included for proper alignment.
Page 37
Section 4: Relevant Experience
Page 38
Please note: This document is designed for double-sided printing. Intentional blank pages are included for proper alignment.
Page 39
35 SECTION 4: RELEVANT EXPERIENCE Town of Granby // On-Call Engineering Services Rockwell Park Revitalization Project Town of Bloomfield, CT Background: Located in Bloomfield, Connecticut, Rockwell Park is one of the primary amenities of the town. The Bloomfield Rockwell Park Revitalization Project will transform this historic community park into a vibrant, inclusive, and sustainable public space. Scope: Benesch was selected to lead the development and execution of a comprehensive master plan, which includes integrating a new segment of the East Coast Greenway through the park to enhance regional connectivity and promote active transportation. Upgrades will also include a multi-purpose synthetic turf field, community garden, gazebo, and associated amenity spaces. Benesch prepared an A2/T2 survey of the entire 14-acre property, including adjacent ROWS, to allow for the detailed design and permitting of the project. The design emphasizes improved accessibility, enhanced recreational amenities, and ecological restoration to support native plantings and storm water management. Key features include upgraded walking trails, new gathering areas, modern play zones, and integrated lighting for safety and usability. Construction is scheduled to begin in 2026, marking a major step toward creating a welcoming environment that celebrates the park’s cultural significance and fosters community engagement for all ages. Key Issues • Survey • Site/Civil Engineering • Landscape Architecture • Ecological Restoration • Walking Trails • Improved Accessibility • Modern Play Zones Dates of Service 06/2025 - Ongoing Project Cost Approx. $4M Client Reference David Melesko Director of Parks, Recreation & Leisure Services 330 Park Avenue Bloomfield, CT 06002-0337 P: (860) 769-3534 E: dmelesko@bloomfieldct.gov
Page 40
36 Town of Granby // On-Call Engineering Services SECTION 4: RELEVANT EXPERIENCE Background: Located just outside of Hartford, Connecticut, the Bloomfield Tennis Club (BTC) offers a variety of programs and services for tennis players of every level. When the time came to expand its facilities, BTC turned to Benesch to provide integrated design services. Scope: Benesch is providing survey, site/civil engineering, landscape architecture and land-use permitting services associated with the construction of six (6) outdoor tennis courts, eight (8) pickle ball courts, an outdoor pool, pavilion, and associated amenities. The potential for future expansion of the tennis and pickle ball courts are being incorporated into the designs. Benesch conducted a boundary, topographic and general location survey of the property. We later merged this information with an existing survey (performed by others) for an adjacent parcel to form one usable boundary and topographic survey, suitable for design, permitting and construction of the project. Site Plan Approval/Special Permitting was required due to the project’s location in an Industrial (IND-2) Zone. Benesch’s land-use permitting effort involved review and analysis of local zoning regulations, preparation of a Stormwater Management Report—including hydrologic and hydraulic analyses—a Stormwater Control Plan, and application preparation. A Wetlands Permit was also required. Post-permitting, Benesch worked with BTC to help them obtain a grant from the United States Tennis Association to construct new tennis courts. We are also actively assisting them with potentially incorporating an outdoor swimming pool into the project. Tennis Court Design – Bloomfield, CT Bloomfield Tennis Club Key Issues • Survey • Site/Civil Engineering • Landscape Architecture • Land-Use Permitting • Hydrologic & Hydraulic Analyses • Coordination with Local Departments Dates of Service 02/20-Ongoing Project Cost $45,000 (design fee) Client Reference Rostyk Datsko General Manager Bloomfield Tennis Club 45 Douglas Street Bloomfield, CT P: 860-878-7391 E: rostyk.datsko@gmail.com New pickle ball courts. View of tennis and pickle ball courts from parking area. New tennis and pickle ball courts.
Page 41
37 SECTION 4: RELEVANT EXPERIENCE Town of Granby // On-Call Engineering Services Background: Being the only Division II school in CT, the athletics program at Southern Connecticut State University (SCSU) has seen major growth in recent years. The 10-year-old AstroTurf field and 20-year-old track were in need of being replaced. Scope: This project includes renovation of the existing field, track, and all of its field events. The upgrades to Jess Dow Field will not only enhance the surface performance, but also improve the aesthetic and branding of SCSU’s primary athletic arena. Benesch performed a boundary and topographic survey for the entire stadium. Underground utility location, utility research and field location of all site amendments were also provided. We also performed an evaluation of all hardscape, softscape, stormwater, and utilities on site and prepared a written report documenting the existing conditions of all applicable site items. Benesch is currently providing civil-related design and permitting services, including erosion control, stormwater and utility design. Jess Dow Field Renovations Southern Connecticut State University Key Issues • Existing conditions analysis • Track and field design • Site planning & analysis • Stormwater management • Utility design • Traffic • Survey Dates of Service 2022 – 2023 Project Cost $1,460,000 Client Reference Rahul Abraham CT Department of Administrative Services 450 Columbus Blvd., Suite 1201 Hartford, CT 06103 P: 860-713-5741 E: rahul.abraham@ct.gov Rendering – Centerfield Rendering – Grandstands Completed field
Page 42
38 Town of Granby // On-Call Engineering Services SECTION 4: RELEVANT EXPERIENCE Background: Benesch worked hand-in-hand with Sports Fields, Inc. to deliver this project as a design-build. Springfield College required an upgrade of the existing natural grass softball field to synthetic turf. The field as well as dugouts and other amenities were dilapidated and at the end of life. Scope: Benesch provided engineering design, land-use permitting, and construction phase services associated with the installation of a synthetic turf softball field. Civil services include detailed layout, grading and subsurface drainage design for the field and associated improvements. Benesch also provided environmental and geotechnical services. This project involved survey and civil design for the renovation of the college softball field from natural grass to synthetic turf. The civil design included erosion control, turf drainage, walkway drainage, handicap accessibility and utilities. Benesch worked closely with the City Engineering Department and DPW to ensure the project met local permitting and design requirements. Springfield College Softball Field Springfield, MA Key Issues • Stormwater • Permitting • Construction services Dates of Service 2020 – 2021 Project Cost $1,300,000 Client Reference Jennifer Vigneault Associate Director of Planning and Facilities Springfield College 263 Alden St Springfield, MA 01109 P: 413-748-3298 E: jvigneault@springfieldcollege. edu
Page 43
39 SECTION 4: RELEVANT EXPERIENCE Town of Granby // On-Call Engineering Services Background: The Miracle League of Northern Connecticut provides opportunities for children with physical and cognitive challenges to participate in recreational activities in an accessible, nurturing, and non-competitive environment where families can come together to cultivate new friendships and experience the joy of play. They worked closely with the Town of Vernon to identify a town location to place a new synthetic turf field that would be sized and built to meet the needs of the children. Scope: The design included a new synthetic turf baseball/softball field and associated amenities (fencing, concrete walks, drainage, utilities, etc.) Additionally, an expansion to the existing school parking lot, including an ADA-accessible turnaround/drop area and ADA-compliant parking spaces, was designed. Due to space limitations, stormwater management was provided via underground detention, which was designed to function with the existing sandy soils. Benesch performed full design services for the project including civil engineering and landscape architecture design. As part of the project, we worked closely with the Town to obtain all required land-use permits and provided construction oversight during construction. Unique Features: The town worked with the Miracle League and performed the parking lot expansion at their own cost. Benesch contracted with the Miracle League for the field design and separately with the Town for the parking lot expansion design. Benesch provided coordination between both entities, including their contractors, to ensure seamless construction coordination. Vernon Miracle Field Miracle League of Northern Connecticut Key Issues • Parking • ADA Compliance • Drainage Dates of Service 11/2022 – 9/2023 Project Cost $1,500,000 Key Personnel Involved Project Manager: Will Walter Client Reference Steven Leibowitz Executive Director Miracle League of Northern CT 76 Frontage Road Vernon, CT 06066 P: 860-916-6521 E: steven_leibowitz@pue-cpas.com
Page 44
40 Town of Granby // On-Call Engineering Services SECTION 4: RELEVANT EXPERIENCE Marvin Caldwell Park City of Concord Background: Caldwell Park is an existing ± 18-acre park located in a transitioning neighborhood in the southeast part of the city. Built in the 1980s and updated in 2001, the City has considered re-master planning the park to address the changing recreation trends, changing demographics and the creation of a more inviting appearance and gateway for the neighborhood. The park will also serve as a trailhead for the first segment of the Irish Buffalo Creek Greenway for the city. The City’s intent is to develop a new vision for the park and establish a budget for park renovations with the understanding that park construction will be phased in over the next five years. Scope: Benesch services to date have included inventory and assessment, concept and master plan development, budget estimates, graphic visualization, public involvement, surveying, schematic design, detailed design, permitting and services during construction. Unique Features: The redevelopment of Caldwell Park will provide new “walk-to” amenities including a splash pad, inclusive playgrounds and multi-sport courts for many residents that live within a half-mile radius of the park. The existing site constraints and being located within the floodplain lend the park programming to focus on low-impact recreational activities. In order to make the park as inclusive as possible, the playground is being designed with poured-in-place surfacing with a seamless transition to perimeter walkways. Public Outreach Approach: Benesch conducted one community drop-in workshop for the purpose of gathering input on recreation needs and proposed facilities. In addition, Benesch presented at two Logan Neighborhood meetings and to the Concord City Council for the adoption of the master plan. Key Issues • Existence of floodway, floodplain and river/stream buffer within park put constraints on re- development of some facilities and placement of new facilities, including the greenway • Redevelopment of an LWCF park required careful planning to ensure that facilities constructed with LWCF funds remain in park programming • Introduction of a greenway into the park design leads to other connectivity needs along the park periphery Dates of Service 03/2019 - Ongoing Project Cost (Estimated) $8 million Client Reference Ms. Sheila Lowry City of Concord Parks & Recreation 147 Academy Avenue NW Concord, NC 28026 P: 704-920-5611 E: lowrys@concordnc.gov
Page 45
41 SECTION 4: RELEVANT EXPERIENCE Town of Granby // On-Call Engineering Services Background: Located in Locust Valley, New York, Friends Academy is a private K-8 school with a robust athletics program. The site has been experiencing perpetual drainage problems, as the soils are not conducive to infiltration; there are no natural low points on site to drain to; and there are no municipal drainage facilities in the ROW adjacent to the site. The natural-grass, multi-use field was no exception and often experienced soggy conditions after rain events, rendering it unplayable. Scope: Benesch provided site/civil engineering services in support of the design of the synthetic turf field. We worked closely with the project architect to design grading and drainage facilities to ensure off-site drainage would not flow onto the field. The drainage system, designed as part of the field, includes a stone reservoir base that captures, detains, and infiltrates stormwater during and after rain events. The field drainage includes a perimeter-collector system that conveys water to existing low spots and dry wells that act as a relief pathway during large events, ensuring water will not pond on the field during or after rain events. Unique Features: As part of the project, Benesch led the design effort for the design of “wick” dry wells that were designed as redundancy for the drainage system on the synthetic turf field. The “wick” dry wells were so well received that Benesch was asked to prepare a campus-wide drainage master plan to address all of the drainage issues on site. The master plan subsequently identified six critical problem areas on site and recommended the use of “wick” dry wells in eight locations on site. Once fully implemented, the master plan, in conjunction with other measures, is anticipated to solve all campus-wide drainage issues. Friends Academy Synthetic Turf Design Friends Academy Key Issues • Grading Design Review • Synthetic Turf Drainage Design • Erosion Control • Permitting • Construction Phase Services Dates of Service 03/2019 – 09/2020 Initial Budget $1,000,000 Project Cost $850,000 Client Reference Ann Marie Tidona, CPA Director of Finance, Operations & Strategic Projects Friends Academy 270 Duck Pond Road Locust Valley, NY 11560 P: 516-393-4203 E: tidona@fa.org Celebration Plaza Outdoor Classroom Completed field.
Page 46
42 Town of Granby // On-Call Engineering Services SECTION 4: RELEVANT EXPERIENCE Background: Benesch has provided survey, engineering, and construction administration services for an extensive array of athletic facilities including the following. • Annie Fisher Montessori School Athletic Fields – Hartford, CT: New synthetic turf baseball, football and soccer complex with additional site features. • Cottone Field – Wethersfield, CT: New artificial turf football field at Cottone Field and peer review of lighting foundation design and construction services. • Blackham School Baseball Field Renovation – Bridgeport, CT: New synthetic fields for three-field complex, site features, and local permitting. • Columbus Park – Hartford, CT: In-filled synthetic multi-purpose field—including youth soccer and baseball field overlays—covered dugouts, backstop, bleacher pads and sidewalks. • Hyland Park Baseball and Soccer Development Plan – Hartford, CT: New synthetic turf baseball and soccer fields with additional site features. • Luis Munoz Marin School Baseball and Football Field Renovation – Bridgeport, CT: New synthetic baseball and football fields with additional site features. • Springfield College Softball Field – Springfield, MA: Design and construction of this synthetic turf softball field. • Rocky Hill Intermediate School – Rocky Hill, CT: Two Athletic Fields for Baseball/Softball and Soccer/Lacrosse. • New London High School Athletic Fields – New London, CT: Design of two synthetic turf fields, replacement of the existing bleachers and press box, new concessions, and team rooms. • Ray Snyder Jr. Municipal Stadium – Waterbury, CT: New synthetic turf surface for football, soccer, softball, and little league baseball. Additional Athletic Field Experience Multiple Clients Cottone Field Key Issues • Artificial/synthetic turf fields for multiple sports • Site layout, grading & drainage • Construction administration • Roadway & traffic engineering • Building & lighting improvements • Utility design • Boundary & topographic survey • Grading & drainage design • Permitting • Planning & zoning commission review Blackham School Baseball Field Springfield College Softball Field New London High School Athletic Fields
Page 47
43 SECTION 4: RELEVANT EXPERIENCE Town of Granby // On-Call Engineering Services Background: Benesch has provided comprehensive engineering services to the New Britain Department of Public Works since 2000. Services encompass roadway and intersection design, traffic and transportation engineering, site design, structural and utility engineering, parks improvements, land surveying and construction services. Scope: The images provided depict a few of the many assignments Benesch has performed under our on-call contract with New Britain. Additional tasks include: • Allen Street Drainage Improvement • A.W. Stanley Bridge Replacement • Downtown Signage Improvements • East Street Water Main Relocation • Franklin Square/Elm Street Improvements • Grand Street Extension • Hart Street Extension • Interstate 84 Water Main Relocation • John Downey Drive Drainage Improvements • McClintock Street Drainage Improvements • New Britain City Hall Rehabilitation • New Britain Courthouse Construction Administration • New Britain Water Main Replacement • New Britain Utility-Subway System Design • New Municipal Dog Pound • Overlook Street/Sealander Street Drainage Improvements • St. Claire Street/Lester Street Improvements • Stanley/Chestnut Street Intersection Improvements • Stanley Golf Course/Fairview Apartments Drainage Improvements • Two-Bay and Four-Bay Fire Stations New Britain On-Call Engineering Services City of New Britain, CT Key Issues • Roadway/Intersection design • Traffic/transportation engineering • Site design • Structural engineering • Utility engineering • Parks improvements • Land surveying • Construction services Dates of Service 2000 - Present Project Cost Varies by Project Client Reference Mark E. Moriarty, PE Director of Public Works City of New Britain City Hall 27 West Main Street New Britain, CT 06051 P: (860) 826-3350 E: mmoriarty@ch.ci.new-britain.ct.us A.W. Stanley Bridge Replacement. Hart Street Extension New Britain Courthouse Construction Administration
Page 48
44 Town of Granby // On-Call Engineering Services SECTION 4: RELEVANT EXPERIENCE East Hartford On-Call Engineering Services Town of East Hartford, CT Key Services • Site/civil structural engineering • Condition inspection • Transportation engineering • Traffic engineering • Land surveying • Geotechnical engineering • Hydraulic engineering • Environmental engineering • Construction inspection • Constructability review • Building & facilities Dates of Service 2003 - 2012 & 2015 - Present Project Cost Varies by project Client Reference Doug Wilson, PE Town Engineer Town of East Hartford 740 Main Street East Hartford, CT 06108 P: 860-291-8373 E: DWilson@easthartfordct.gov Overview: Benesch has served as East Hartford’s on-call engineering consultant from 2003 to 2012 and again from 2015 to present, continuing to support town staff today. Over the course of this relationship, we have completed numerous individual assignments on time and within budget. A sampling of that work is provided below. • Main St. CCGP Grant Application • Main St. Levee Sidewalk • DPW Tank Replacement • Solar Carport Structure Evaluations • East Hartford Flood Protection System Inspection and Repairs • Environmental Evaluation & Remediation - 1006 Silver Lane • Evaluation of Meadow Lane Farm Environmental Report • Flood Protection System Benefit Cost Analysis • GIS Wetland Mapping Conversion • Governor St. Reconstruction - Geotechnical and Traffic Engineering, Retaining Wall Design • Governor St. Signalization and Retaining Wall Design • Hockanum River FEMA Flood Insurance Rate Map Revision • Inspection of Single-Arm Cantilever Sign Support • Main St. Master Plan • Orchard St. Drainage Improvements • Peer Review of CVS Traffic Analysis • Pedestrian Foot Bridge Replacement - Burnside Avenue to Labor Field • Phase I Environ. Site Assessment - Hilltop Farms/Barbara Drive • Phase I Environmental Site Assessment - Short Reach/Hillside Avenue • Preparation of LOMR Request to FEMA - Hillside St./Burnside Avenue Parcel • Public Safety Complex - Access Improvements • Rentschler Field Shoppes • Roberts St. Pavement Evaluation • Scour Evaluation - Bridge No. 04496 and Bridge No. 05826 • Stormwater Pollution Prevention Plan for Transfer Station • Town Hall HVAC upgrades • Town Hall Pavement Evaluation • Traffic Counts / ADT Development - Various Roadways
Page 49
45 SECTION 4: RELEVANT EXPERIENCE Town of Granby // On-Call Engineering Services On-Call Engineering Contract City of Springfield, MA Benesch has provided the City with on-call engineering services for over a decade. Our contract supplements City staff and includes surveying, civil engineering, roadway and traffic design, flood control system design, inspection and maintenance, as well as building and infrastructure inspection. A sample of projects delivered across our on-call contracts is provided below. Berkshire Avenue Corridor Improvements: Benesch analyzed traffic projections and crash data for the corridor, conducted intersection capacity analyses for staged and final conditions at two coordinated signal locations, and evaluated vehicle access at abutting driveways integrated with the signal system. Corridor improvements included exclusive bike accommodations, reconstructed curb ramps, crosswalks and bike boxes at both intersections, and approach widening to accommodate large vehicles and bicycle traffic. Reconstruction of Birnie Avenue at Gerena School Pedestrian Tunnel: Benesch was retained by the City of Springfield to perform ground survey, design roadway improvements and rehabilitate the roadway bridge/pedestrian tunnel underneath Birnie Avenue connecting to the German Gerena Community School. Due to a history of water infiltration at the bridge/tunnel structure, the project includes design to waterproof the structure, as well as the implementation of a raised speed table to address both water infiltration and high vehicular speeds along the corridor. Central Street Corridor Improvements: Benesch provided schematic and final design, survey, environmental and geotechnical engineering, traffic services, right-of-way, and bidding and construction administration for this reconstruction and realignment project. Work included two signalized and eight stop-controlled intersections, realignment of Central Street at Hancock Street, conversion of Hickory Street to two-way traffic and Rifle Street to one-way traffic. Springfield Flood Control System Inspection & Improvements: Benesch provided design, construction and inspection services to oversee improvements required by the Army Corps of Engineers and FEMA. We surveyed and prepared designs for the Flood Control System: removal of vegetation from 4,000 LF of earthen dikes, structural repairs to 13,000 LF of concrete floodwalls, and repairs to the Mill River conduit system. We currently provide quarterly inspection and maintenance services. Design Improvements to the Allen Street/Bicentennial Highway Corridor: Benesch prepared planning and design documents for roadway and circulation improvements in this heavily congested area. Planning services included significant data gathering, stakeholder meetings, conceptual design and traffic analysis. Numerous alternatives were developed to determine a solution for addressing increasing traffic volumes, while maintaining safety for area residents. Main Street Reconstruction & Roadway Improvements: The project consisted of surveying, the reconstruction of 4,500 feet of roadway, replacement of sidewalks, new street lighting, new traffic signals, and new pedestrian crosswalks. Benesch worked very closely with the Springfield Business Improvement District (BID) to coordinate design and construction activities. Key Issues • Site/civil • Structural engineering • Condition inspection • Transportation engineering • Traffic engineering • Land surveying • Geotechnical engineering • Hydraulic engineering • Environmental engineering • Building & facilities Dates: 2001 - Ongoing Project Cost: Varies by project Client Reference Christopher Cignoli, PE Director DPW City of Springfield 70 Tapley Street Springfield, MA 01104 P: 413-750-2808 E: Ccignoli@springfieldcityhall.com
Page 50
46 Town of Granby // On-Call Engineering Services SECTION 4: RELEVANT EXPERIENCE Background: Benesch has been providing the Town of West Springfield with on- call engineering services for over a decade. Designed to supplement the Town’s Staff and expertise, our contract encompasses full site/civil engineering services, including roadway and bridge design, construction inspection, surveying, and coordination of associated consultants for mechanical, electrical and geotechnical engineering, landscape design, and aerial mapping. Scope: The images provided depict a few of the many assignments Benesch has performed under our On-Call Contract with West Springfield. Additional tasks include: • Birnie Avenue Culvert Repairs • Elm Street/Kings Highway Intersection Improvements • Elm Street Parking & Pedestrian Improvements • Flood Protection System ACOE Accreditation • Flood Protection System Design Improvements • Flood Protection System FEMA Comprehensive Inspection • Flood Protection System Maintenance Deficiency Correction Plan (MDCP) • Memorial Avenue/Bresnahan Street Intersection Design • Mittineague Bridge Analysis • Piper Road Crosswalk Study • Piper Pond Outlet Control Studies • Preparation of a Notice of Intent — West Springfield Flood Control System/ Dike Repair Plan • Route 20/Route 5 Rotary Study • Route 20 Vehicular Speed/Signal Study • School Zone Traffic Signal Study • Town Green Power Improvements • Veteran’s Park Parking Improvements • Westfield Street/Second Street/Chestnut Street Intersection Improvements West Springfield On-Call Engineering Services Town of West Springfield, MA Key Issues • Site/civil engineering • Roadway design • Bridge design • Construction inspection • Surveying • Flood protection system inspection, design, maintenance & accreditation • Traffic engineering • Innovative traffic concepts • Municipal traffic studies Dates of Service: 2001 - Present Project Cost: Varies by Project Client Reference Robert Colson, Director of Public Works Town of West Springfield 26 Central Street West Springfield, MA 01089 P: 413-263-3030 E: rcolson@west-springfield.ma.us Elm St. Parking & Pedestrian Improvements Elm St./Kings Highway Intersection Improvements Flood Protection System Maintenance Deficiency Correction Plan (MDCP).
Page 51
47 SECTION 4: RELEVANT EXPERIENCE Town of Granby // On-Call Engineering Services On-Call Engineering (Street Improvements) City of Medford, MA Background: The City of Medford instituted major roadway improvements to six local streets to provide better access to an elementary school and reduce cut-through traffic in the project area. The City contracted with Benesch to develop a comprehensive plan to calm traffic and reduce accidents, while also improving roadways, parking areas, and sidewalks within this residential area. Funding for the project was obtained through a Federal Community Development Block Grant. Scope: Benesch designed traffic safety improvements and calming features for Auburn, Cottage, Allston, Prescott & Hinsdale Streets and Windsor Road. Updates include raised intersection tables and curb bump-outs to slow traffic and improve safety for all users. Benesch upgraded the roadway and sidewalk network to provide complete street features and upgrade facilities to meet Federal ADA and State AAB regulations. Features included reconstruction of sidewalk curb ramps and new crosswalk patterns. Benesch also provided topographical survey, municipal water and drainage design, utility relocation coordination, traffic management, and phased construction schemes. Various drainage system improvements and renovation of the existing water system included new water gates, hydrants & service connections. One of the primary challenges with the project location was accommodating elementary school pick-up and drop-off within the project limits. Phased construction was implemented to maintain traffic through the heavily traveled corridor adjacent to the school as well as reduce impacts to the many abutters. Benesch worked closely with the Office of Community Development, Engineering, Forestry and Water Departments to provide resident engineering services which included organization and promotion of public meetings (e.g. public tree hearing), development of construction bid documents, assisting the City with Issued for Bid (IFB) notice, review of bids, contractor recommendation, weekly progress meetings, frequent field meetings, and ensuring contractor compliance with the contract documents. Key Issues • Federal CDBG funding • ADA/AAB sidewalk upgrades • Incorporated traffic calming elements • Roadway reconstruction • Water main and service line replacement • Construction observation • Public meeting coordination Dates of Service: 2018 - 2022 Project Cost: $1,700,000 Client Reference Ahmet Caus, Assistant City Engineer City of Medford 85 George P. Hassett Drive, Room 300 Medford, MA 02155 P: 781-475-5975 E: acaus@medford-ma.gov
Page 52
48 Town of Granby // On-Call Engineering Services SECTION 4: RELEVANT EXPERIENCE Hartford On-Call Services 2018-2024 City of Hartford, CT Contract Value $5,000,000 Client Reference William Diaz Project Leader P: 860-757-9604 E: diazw003@hartford.gov SPA provided on-call services to the City of Hartford. Being on-call to the City of Hartford means the firm provides assistance to various City departments with the following: • Program Review • Field Investigation • Program Development • Code Analysis • Preliminary Design / Schematic Design / Design Development / Construction Documents • Regulatory Review, Meetings, and Approvals • Cost Estimates for any/all phases of design • Contract Documents • Construction Administration Projects completed under this contract include: • Sports and Medical Academy Roof Replacement • Firehouse #5 – Capital Needs Assessment • Firehouse #5 - Design through Construction administration Sisson Avenue Firehouse #11 – Renovations including new kitchen, generator, lighting, roof replacement and paving improvements • 24 Ely Street Church As-Builts SPA provided on-call services to the City of Waterbury. On- call A/E services were provided to Connecticut’s fifth largest city to assist them in maintaining their public buildings and structures. The firm was selected for its in-house, integrated design services. Some of the projects completed under this contract were: • Addition of air conditioning at the North End & River Recreation Center gymnasiums • Window replacement, a new generator, and HVAC upgrades at the Waterbury Police Activities League (PAL) • Toilet improvements and ADA compliance at Western Hills Golf Club • HVAC replacement at Chase Parkhouse • Variable Frequency Drive (VFD) design and pump upgrades at Thomaston WWTP • Outdoor pool evaluation Client References Paul Bellagamba, PE City Engineer P: 203-574-6851 E: pbellagamba@waterburyct.org Mark Lombardo Deputy Director Public Works P: 203-574-6851 E: mlombardo@waterburyct.org Waterbury On-Call Services 2017 - 2027 City of Waterbury, CT
Page 53
49 SECTION 4: RELEVANT EXPERIENCE Town of Granby // On-Call Engineering Services REFERENCE #1 Municipality: Southern Connecticut State University 615 Fitch Street Hamden, CT 06514 Dates of Service: 2022 - 2023 Description of Work Performed: Renovation of the existing field, track, and all of its field events. (Full project description provided on page 37) Client Contact: Eric Lessne Assoc. VP - Capital Budgeting & Facility Operations P: 203-392-6050 REFERENCE #2 Municipality: Miracle League of Northern CT 76 Frontage Road Vernon, CT 06066 Dates of Service: 2022 - 2023 Description of Work Performed: New synthetic turf baseball/softball field and associated amenities. (Full project description provided on page 39) Client Contact: Steven Leibowitz Executive Director P: 860-916-6521 E: steven_leibowitz@pue-cpas.com REFERENCE #3 Municipality: Bloomfield, CT 330 Park Avenue Bloomfield, CT 06002-0337 Dates of Service: 2025 - Ongoing Description of Work Performed: The development and execution of a comprehensive master plan. (Full project description provided on page 35) Client Contact: David Melesko Director of Parks, Recreation & Leisure Services P: (860) 769-3534 E: dmelesko@bloomfieldct.gov At Benesch, we believe a project’s quality depends upon completing the job on time, within budget and above all, satisfying the needs and desires of the client. Our focus on client satisfaction is probably best demonstrated by the excellent reputation we have earned throughout our 80+ year business history. We invite you to contact the following references for a testament of our service. REFERENCES
Page 54
Please note: This document is designed for double-sided printing. Intentional blank pages are included for proper alignment.
Page 55
Section 5: Cost Proposal
Page 56
Please note: This document is designed for double-sided printing. Intentional blank pages are included for proper alignment.
Page 57
53 SECTION 5: COST PROPOSAL Town of Granby // On-Call Engineering Services Page 7 of 7 APPENDIX A Cost Proposal Name of Engineering Firm: ___________________________________________________ Services Needed On-Call Engineering and Related Services Please indicate your firm’s hourly fees over the five-year period of the contract Billing Category Hourly Billing Rate Project Manager ________________ Chief Engineer ________________ Engineer ________________ Technician Support ________________ Clerical/Researcher ________________ Other ________________ Other Expenses (if applicable): Identify any other categories and costs required to provide Engineering and On-Call services that are not included above: ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ Rates are subject to increase 4-5% per year. Benesch $190 $210 $150 $115 $95 We will bill direct expenses (mileage, shipping, permit-related reproduction, etc.) with zero mark-up.
Page 58
54 Town of Granby // On-Call Engineering Services SECTION 5: COST PROPOSAL SCOPE AND FEE ASSUMPTIONS AND EXCLUSIONS • Any traffic control required will be billed separately and is not included in this proposal. • The excavation of buried utilities and the cleaning or unclogging of pipes or sumps of any structures by Benesch’s crew are not included. FEE STRUCTURE DIRECT REIMBURSABLE EXPENSES Classification Billable Rate Travel IRS-Approved Rate Overnight/Special Delivery Postage At Cost Special Equipment Rental At Cost Tolls/Parking At Cost Laboratory Testing At Cost Benesch respectfully reserves the right to negotiate terms and conditions to align with industry standards should we be successful at winning this opportunity.
Page 59
Please note: This document is designed for double-sided printing. Intentional blank pages are included for proper alignment.
Page 60
Page 61
REQUEST FOR PROPOSAL Town of Granby Professional Engineering Services July 24, 2026
Page 62
BL Companies Table of Contents Section I Letter of Interest & Contact Information Section II Firm Overview Section III Project Team Section IV Project Understanding Section V Relevant Experience Section VI References Section VII Services Expected from the Town Section VIII Cost Proposal Section IX Contract Exceptions
Page 63
SECTION I Letter of Interest & Contact Information
Page 64
July 24, 2026 Mr. Mike Walsh Town Manager Town of Granby 15 North Granby Road Granby, CT 06035 Re: Professional Engineering Services RFP Dear Mr. Walsh, BL Companies Connecticut, Inc. (“BL Companies”) is pleased to submit our qualifications to provide Professional Engineering Services for the Town of Granby. We have the expertise, experience, capabilities, and commitment necessary to successfully support the planning, design and construction of the Town’s athletic/running track and adjacent baseball and softball fields, as well as the on-call engineering services identified in the Request for Proposals. BL Companies is a 100% employee-owned, multi-discipline consulting firm providing civil engineering, transportation engineering, landscape architecture, environmental, surveying, planning, architecture, and construction administration services throughout Connecticut and the Northeast. With more than 360 professionals and a long history of serving municipalities, state agencies, educational institutions, and recreation agencies, BL Companies offers the technical depth of services, responsiveness, and local knowledge necessary to support the Town’s needs throughout the five-year term of this contract. We understand that the Town is seeking engineering services for the planning, design, and construction of a replacement athletic running track and adjacent baseball and softball fields at the high school/middle school complex, as well as on-call engineering services to support projects including the construction of a year-round restroom facility at Salmon Brook Park, pickleball court improvements, sewer pump maintenance projects, and other municipal infrastructure initiatives. BL Companies has extensive experience providing planning, design, permitting, bidding, construction administration, and on-call engineering services for athletic facilities, parks and recreation improvements, municipal infrastructure, and capital improvement programs throughout Connecticut. Our Connecticut operations are anchored by our centrally located Meriden headquarters, and our newly renovated East Hartford office, which provides convenient access to communities throughout the state, including the Town of Granby. The resources available through our Connecticut offices, combined with BL’s integrated team of licensed engineers, landscape architects, planners, environmental professionals, land surveyors and construction inspectors, allow us to rapidly respond to municipal needs and efficiently deliver projects of varying size and complexity. 355 Research Parkway, Meriden, CT 06450 T (203) 630-1406 www.blcompanies.com
Page 65
BL Companies has significant experience and expertise in municipal on-call contracts/programs including architectural, engineering (mechanical, plumbing, electrical, fire protection), structural (bridge & building), transportation engineering, civil engineering, land surveying, landscape architecture, and planning consulting services. We are currently providing multi-disciplined on-call services to a range of Connecticut municipalities and state agencies including: The benefits BL Companies brings to the Town of Granby include: • Extensive experience with municipal engineering, site design, drainage analysis, permitting, and construction administration. • Significant expertise in the planning, design, and construction of athletic facilities, recreational complexes, parks, and public-use spaces. • Relevant experience supporting park and recreation improvements, including projects similar to the proposed Salmon Brook Park improvements. • A fully integrated, multidisciplinary team capable of providing all required engineering and related services in-house. • Proven success delivering on-call engineering services for municipalities throughout Connecticut. • Familiarity with Connecticut regulatory requirements, permitting agencies, and municipal processes. • Strong local presence through our Meriden and East Hartford offices and the ability to rapidly mobilize staff and resources. • Dedicated project management and proactive communication to keep projects on schedule and within budget. • Town of Bloomfield • City of Danbury • Town of East Hartford • Town of Glastonbury • City of Hartford • City of Meriden • Borough of Naugatuck • City of New Britain • Town of Plymouth • City of Shelton • Town of Stratford • Town of Windsor • CRCOG • METROCOG • NVCOG • SCRCOG • CT Judicial Branch • CT General Assembly • Department of Administration Services (DAS) • Connecticut Department of Transportation (CTDOT) • University of Connecticut (UCONN) 355 Research Parkway, Meriden, CT 06450 T (203) 630-1406 www.blcompanies.com
Page 66
Joshua Wheeler, RLA, will serve as the Project Manager and primary point of contact for this contract. Mr. Wheeler brings extensive experience managing municipal infrastructure, site development, and public recreation projects throughout the region. As a licensed Landscape Architect with significant experience coordinating multidisciplinary teams, Mr. Wheeler will provide day-to-day oversight of task assignments, client coordination, schedule management, and quality control. Supported by BL’s engineering, landscape architecture, environmental, surveying, and construction services professionals, he will ensure the Town receives responsive, high-quality service for both the athletic facilities project and future on-call assignments. BL Companies has reviewed the requirements of the RFP and understands the Town’s objectives. We are confident that our experience, local presence, technical capabilities, and commitment to client service position us to be a valuable long-term partner for the Town of Granby. Thank you for your consideration of our proposal. We appreciate the opportunity to submit our qualifications and look forward to discussing how BL Companies can assist the Town in successfully advancing the athletic facilities improvements, Salmon Brook Park initiatives, and future municipal engineering projects. Sincerely, BL Companies Michael G. Fisher, PE Regional Manager & Principal 355 Research Parkway, Meriden, CT 06450 T (203) 630-1406 www.blcompanies.com
Page 67
BL Companies Contact Information Mr. Michael Fisher, PE is the Director-in-Charge of this Town of Granby Request for Proposal and can be contacted at the following: Mr. Michael Fisher, PE Director-in-Charge BL Companies 355 Research Parkway Meriden, CT 06450 mfisher@blcompanies.com 860.760.1918 (Direct Line)
Page 68
SECTION II Firm Overview
Page 69
About BL Companies Your Partner for Integrated Services & Creative Solutions. Founded in 1986, BL Companies delivers an integrated blend of architecture, engineering, environmental, and land surveying services on projects throughout the United States. Our multidisciplinary teams collaborate daily to plan, design, and develop the spaces and infrastructure that shape everyday life. From small assignments to large, complex programs, we approach each project with the agility and insight needed to provide creative, high‑quality solutions grounded in technical expertise. BL Companies is a leading multidiscipline firm, regularly ranked as a Top 500 Design Firm by Engineering News Record. With over 150 licensed professionals, BL Companies brings the resources and capabilities of a large firm while our employee‑ownership culture and commitment to client care ensures we provide the personal, attentive service of a small firm. Driven by a culture of excellence and responsiveness, we remain firmly committed to total client satisfaction and consistently deliver exceptional results. As a 100% employee‑owned company, we believe in the power of teamwork and long‑lasting partnerships. Our dedicated employees are the backbone of our firm and our professional community. Being employee‑owned and team‑oriented means we celebrate each other’s successes as a united force because there are no boundaries to what we can achieve when working together. Our tagline, “Employee Owned. Client Driven.”, isn’t just a phrase to us; it informs our collaborative process and encourages us to deliver solutions that go beyond individual efforts, ensuring a result that surpasses client expectations. SERVICES Architecture Civil Engineering Environmental Services Land Surveying & Geospatial Services Construction Administration Energy Services Landscape Architecture MEP Engineering Planning Structural Engineering Subsurface Utility Engineering Transportation Engineering PEOPLE ESTABLISHED OUR MISSION Our mission is to provide creative solutions that enhance the built and natural environment through the leadership and dedication of our employee owners working in partnership with our clients. EMPLOYEE-OWNED ENR TOP 500 FIRMS OFFICES 18 365+ 1986 100% 231 13 STATES BL Companies
Page 70
BL Companies Office Locations CONNECTICUT Meriden (Corporate HQ) 355 Research Parkway Meriden, CT 06450-7100 Hartford Opening new office in East Hartford, CT soon!
Page 71
BL Companies WE SPECIALIZE IN: • Park design • Park Master Planning • Trail design • Splash pads/Spray Parks • Playgrounds • Dog Parks • Sport Courts (Tennis, Pickleball, Basketball) • Playgrounds PARKS, SPORTS & RECREATION Designing Active Environments BL Companies’ Sports & Recreation Team has a concentrated focus on outdoor recreation and athletics design within the disciplines of Architecture, Landscape Architecture and Civil Engineering. BL Companies leverages extensive in-house expertise and strategic partnerships to deliver tailored sport and outdoor recreation solutions. With more than 100 parks and athletic facilities completed and over 50 years of combined experience, our multidisciplinary team of landscape architects, architects, and engineers provides comprehensive services—from planning and design to construction oversight. We design facilities ranging from single-sport fields to multi-sport complexes, all meeting industry standards, ADA requirements, and grant eligibility criteria, with a focus on both end users and long-term maintenance needs. • Track and field complexes, courts, and competitive facilities • Municipal-wide and individual facility master planning • Athletic facilities needs assessments • Stadium, bleacher, and restroom facility design • Sports lighting systems • Athletic fields • Natural grass and synthetic turf • Irrigation design coordination • Golf design and renovation
Page 72
BL Companies KEY SERVICES Site Analysis & Master Planning Sustainable Design Strategies Vegetative Roof Design Permitting Irrigation Design Construction Documentation LANDSCAPE ARCHITECTURE Enhancing Outdoor Spaces At BL Companies, we recognize the transformative art of shaping land through planning, design and preservation. • Public Spaces & Courtyards • Educational Facilities • Corporate Development • Residential Communities • Parks & Open Space Planning • Athletic Field Design SPECIALTIES Our skilled Landscape Architects help lay the foundation, skillfully identifying opportunities in all different sorts of outdoor spaces, and crafting designs that achieve the desired image and experience.
Page 73
BL Companies KEY SPECIALTIES Project Management Facility Master Planning Feasibility & Assessment Studies Site Design Drainage & Hydrology Design Utility Systems Coordination & Design Public Land Use Permitting Sanitary & Septic Design Subdivision Infrastructure Design Roadway Design 3D Visualizations Geographic Information Systems (GIS) CIVIL ENGINEERING Innovative Infrastructure The civil engineering team at BL Companies has a wealth of experience that it brings to each and every project. After carefully evaluating a client’s needs, timeline, budgetary concerns, and desired outcomes, the team employs creative and innovative ideas to produce cost-effective solutions. Our approach to project delivery means that our skilled engineers work collaboratively between different disciplines to develop thorough, high-quality designs. Throughout the process, from design to construction completion, they remain involved, committed to ensuring the client’s objectives are met.
Page 74
BL Companies KEY SERVICES Culverts & Retaining Walls Traffic Signal Analyses & Design Hydrologic & Hydraulic Analyses & Design Site Access Traffic Impact Feasibility Studies State & Local Permitting Environmental Permitting Parking & Traffic Circulation Subsurface Utility Engineering 3D Visualizations Geographic Information Systems (GIS) TRANSPORTATION & INFRASTRUCTURE ENGINEERING Elevate Your Transportation Projects Navigating the complex world of transportation engineering demands expertise, seamless coordination and effective solutions. At BL Companies, our Transportation Engineering Group stands out with extensive experience and a proven track record of collaboration with all project stakeholders. While navigating the permitting process can be demanding, our experience gives us a unique insight into providing solutions to challenges such as safety issues, capacity requirements and last-minute design changes. From bidding to design, studies, permitting, construction and closeout, we ensure that our client’s requirements are met and the best possible results are attained. • Highway & Roadway Design • Structural Design of Bridges • Transportation Planning • Streetscape Enhancement • Context-Sensitive Solutions SPECIALTIES
Page 75
BL Companies KEY SPECIALTIES New Construction & Additions Rehabilitation & Renovation Historic Preservation Adaptive Reuse Prototype Design and Development Interior Architecture Sustainable Design 3D Visualizations ARCHITECTURE Blending Creativity with Technical Expertise By establishing a clear understanding of our client’s objectives, BL Companies delivers thoughtful architectural designs by addressing all of the elements surrounding a project. We talk objectives, vision, schedule, and budget in order to develop designs that serve our client’s needs and enhance their environment. Our talented staff of architects has the benefit of coordinating with our in-house engineering, planning, and landscape architecture staff for seamless client service. Through rigorous cross-discipline collaboration, we deliver designs that balance aesthetics, function, cost and quality. We are also a member of the US Green Building Council, and we are proud of our commitment to sustainable design. Our staff includes multiple LEED Accredited Professionals who have produced numerous LEED-certified designs.
Page 76
BL Companies KEY SERVICES Inspections & Investigations Construction Administration & Support 3D Visualizations STRUCTURAL ENGINEERING Structurally-Sound Designs When it comes to structural engineering, our best work is never seen. This philosophy of invisible excellence seamlessly blends technical, fiscal, and environmental concerns, resulting in structurally sound designs that our clients love. Emphasizing practicality and constructibility, our solutions are as attractive as they are economical. From retail centers to mixed-use constructions, storage facilities to schools, parking structures to building renovations, and warehouse-industrial projects, we have a proven track record of success. Whatever the task, we assemble a specialized team to cater to specific requirements and foster collaboration with the design team for outstanding outcomes. • New Construction & Additions • Rehabilitation & Renovation Foundation for Pre-Engineered Metal Buildings • Retaining Walls & Excavation Support Systems • Supports for Telecommunication Equipment • Supports for Gas & Electrical Transmission Industry • Bridge Design SPECIALTIES
Page 77
BL Companies KEY SERVICES Building System Maintenance Repair & Replacement Code Compliance Studies Lifecycle Cost Analyses Lighting Systems Integrated Control Systems Plumbing Systems MEP ENGINEERING Elevating Comfort and Efficiency BL Companies knows how important a facility’s mechanical, electrical, plumbing and fire protection (MEP/FP) systems are to the comfort of its occupants and the effectiveness of its operations, which is why it’s critical to have systems that are designed with the client’s goals in mind. Our experienced MEP/FP team crafts energy-efficient, cost-effective, and environmentally sound systems, backed by our commitment to sustainable design and our members of the US Green Building Council with a deep bench of LEED Accredited Professionals on board. We offer comprehensive MEP/FP services for all phases of design through construction. • New Construction & Additions • Rehabilitation & Renovation • Energy Conservation & Sustainability Studies • Air Quality Analyses & Remediation • Telecommunications & Computer Data Systems • Backup Power & Redundancy Systems • Central Heating & Cooling System Design • Heat & Energy Recovery • Fire Protection & Extinguishing Systems SPECIALTIES
Page 78
BL Companies KEY SERVICES Environmental Assessments and Permitting Ecological and Habitat Services Construction and Compliance Support Geospatial and Reporting Capabilities NATURAL RESOURCES Science with Stewardship • Wetland Identification and Delineation (State and Federal) • Jurisdictional Determinations • Local, State, and Federal Permitting • Ecological and Habitat Evaluations • Soil Evaluations and Infiltration Testing • Floodplain Assessment and Permitting • Stream Assessment, Stabilization, and Restoration • Tree Conservation and Forestry Management Plans • Stormwater Management • Coastal Resource Identification and Permitting • Environmental Inspection for Construction • NEPA and State- Level Environmental Policy Act Compliance • Categorical Exclusions for DOT Work • Expert Testimony • Threatened and Endangered Species Coordination and Studies • Invasive Species Surveys and Management Plans • Vernal Pool Surveys • Bat Habitat Assessments • NOAA National Marine Fisheries Assessments • Wetland Mitigation Design, Construction Oversight, and Monitoring BL Companies’ Natural Resources Group provides expert environmental consulting and regulatory guidance to support responsible land development, infrastructure, and energy projects across diverse ecosystems. SPECIALTIES
Page 79
BL Companies KEY SERVICES ASTM 1527-21 & CTDEEP Phase I Environmental Site Assessments Phase II & III Environmental Site Assessments Site Remediation & Closure UST/AST Compliance Geophysical Investigations Hazardous Building Materials Inspections Brownfields Redevelopment Environmental Compliance Audits Environmental Permitting & Management SITE ASSESSMENT, REMEDIATION & CLOSURE Environmental Insight that Moves Projects Forward From brownfield redevelopment to complex permitting, our environmental experts help clients anticipate challenges, uncover opportunities, and complete projects responsibly. BL Companies’ Site Assessment and Remediation Group helps clients navigate the environmental challenges that can shape a project’s feasibility, schedule, or budget. From identifying regulated compounds in soil, groundwater, or building materials to developing remediation strategies, we provide practical, science-based solutions that move projects forward. Our team combines deep technical knowledge with decades of experience in brownfield redevelopment, permitting, and environmental compliance. Whether it’s managing environmental risk during property transactions or securing complex regulatory approvals, BL Companies offers a single, integrated source for creative, cost-effective, and responsible environmental services.
Page 80
BL Companies LAND SURVEYING & GEOSPATIAL SERVICES Precision and Professionalism KEY SERVICES GPS Services Property & Topographic Surveys Land Title Surveys Utility Surveys Photogrammetric Control UAV Mapping High Definition 3D Laser Scanning Hydrographic Surveys Flood Elevation Certificates Railroad & Bridge Surveys Construction Layout GIS Subsurface Utility Engineering (SUE) At BL Companies, our land surveying and geospatial services provide precision and detail to every project. We utilize the newest technology, equipment, and computer software to ensure that the data collected is both comprehensive and accurate. Whether it is from the air, ground, or below the surface, our land surveying capabilities provide engineers and architects with a complete and precise understanding of the site. Our commitment to quality at BL Companies extends to our land surveying services, driving us to gather the most experienced and capable team of surveyors available in the industry. We are dedicated to professionalism as well as safety on the job site, making us your ideal partner for all of your land surveying needs.
Page 81
BL Companies KEY SPECIALTIES Full-Time Construction Inspection & Periodic Site Observation Coordination And Procurement Of Material Testing Construction Administration & Management Contractor Change Order & Claim Review Contractor Payment Requisition Review & Quantity Verification Independent Survey Stakeout & Verification As-Built Drawings Construction Engineering Support CONSTRUCTION ENGINEERING & INSPECTION Maximizing Infrastructure Investment We bring reliable CE&I expertise, regulatory knowledge, and a commitment to maximizing every project’s potential. BL Companies provides comprehensive construction engineering and inspection (CE&I) services, including contract administration, site surveying, and related support for municipal and state clients. We are proficient in the CTDOT’s 5-book recordkeeping system, AASHTOWare, COMPASS, SharePoint, and other industry software. Our inspection professionals exceed certification requirements across jurisdictions, with credentials from NETTCP, ATSSA, ACI, and OSHA. BL is prequalified with the Connecticut Department of Transportation for CE&I of road and bridge projects and holds on- call agreements with several Connecticut Councils of Government for similar municipal work. We are experienced with a wide range of funding sources—including municipal/state bonds, federal programs, and LOTCIP—and help clients maximize their project scope within available budgets.
Page 82
BL Companies KEY SPECIALTIES Community Planning Workshops Public Site Walks Community Surveying Social Media Project Campaign Website Creation & Management Pop-Up Informational Events PUBLIC OUTREACH & ENGAGEMENT Building Better Communities Through Meaningful Engagement The future of our communities depends on planning that reflects the needs and aspirations of residents, stakeholders, and partners. Successful public planning projects require collaboration and transparency from start to finish, ensuring that immediate project goals align with long-term community vision. BL Companies specializes in P ublic Outreach and Engagement services tailored to each project and community. Our team works closely with clients and steering committees to develop customized Outreach and Engagement Plans that foster awareness, provide education, and create meaningful opportunities for public input and decision-making. Flexible and adapt able, our approach ensures that every plan is designed to meet the unique goals of the project while empowering communities to shape their own future.
Page 83
SECTION III Project Team
Page 84
Ken Radziwon, PE QUALITY ASSURANCE / QUALITY CONTROL Michael Fisher, PE DIRECTOR-IN-CHARGE David Cicia, PE Jessica Bates, PE HYDRAULICS & DRAINAGE Michael Dion, PE, PTOE, RSP1 Michael Shepley, PE, PTOE TRAFFIC ENGINEERING Robert Roles, PE Timothy Houle, PE CIVIL ENGINEERING Dominick Celtruda, PLA, ASLA LANDSCAPE ARCHITECTURE Steven Fraysier, PE Jason Ellis, PE TRANSPORTATION ENGINEERING Christen Robbins, AIA, LEED AP Todd Johnson ARCHITECTURE Jesse Vose, PE Dennis Burton, PE MEP ENGINEERING Brian Reilly, PE Dan McDonald, PE STRUCTURAL ENGINEERING (BRIDGES) Christopher Albino, PE John Malary, PE STRUCTURAL ENGINEERING (BUILDINGS) Joshua Wheeler, PLA PROJECT MANAGER Matthew Stark Peter Schirmer, PE CONSTRUCTION INSPECTION & ADMINISTRATION Sagan Simko, CPSS, PWS Wesley Wolf, PWS ENVIRONMENTAL RESOURCES & PERMITTING Donald Smith, PLS James Schrager, PLS LAND SURVEYING Joy Kloss, LEP, CHMM Samuel Haydock, LEP ENVIRONMENTAL SERVICES Christopher Critelli, PE SEWER ENGINEERING BL Companies Organizational Chart
Page 85
BL Companies Michael G. Fisher PE Regional Manager Summary of Qualifications Mr. Fisher has 32 years of experience in planning and designing state and municipal transportation projects. As a Senior Project Manager and Lead Engineer, he has spearheaded major highway and roadway improvements, realignments, intersection upgrades, roundabouts, resurfacing, safety enhancements, traffic signals, bridge replacements, and hydrologic/hydraulic designs. A strong advocate for complete streets principles, Mr. Fisher consistently strives to design infrastructure that accommodates all users. His projects frequently include ADA/ PROWAG-compliant sidewalks and multi-use trails, on-street bicycle facilities, and mass transit infrastructure. He has also delivered streetscape designs that enhance aesthetics, promote traffic calming, and serve as gateway treatments for communities across the Northeast. Mr. Fisher’s work often addresses complex environmental, historical, and sociological considerations, requiring close coordination with federal, state, and local agencies. He is well-versed in State and FHWA Design Standards, environmental permitting processes, and the detailed documentation required for project development. Relevant Experience On-Call Architecture / Engineering Services New Britain, CT Served as Project Manager of this contract with the City of New Britain for on-call services. This contract administered under the City of New Britain Engineering Department provided for rapid response to the City for civil, transportation, architectural and structural engineering support services for infrastructure work required by the City. Sites requiring consulting services included properties, structures, and/or buildings under the care and control of the City. On-Call Engineering and Surveying Services Meriden, CT Served as Director-in-Charge of this contract with the City of Meriden for on-call services. Under this contract BL Companies HIGHLIGHTS YEARS IN THE INDUSTRY 32 EXPERTISE Transportation: Highway, Traffic, CE&I, Civil Infrastructure Project Management PROJECT ROLE Director-in-Charge EDUCATION Bachelor of Science in Civil Engineering, University of Connecticut, 1994 REGISTRATIONS Professional Engineer: CT, MA, NJ, NY, NC, OH, RI PROFESSIONAL MEMBERSHIPS American Society of Civil Engineers Institute of Transportation Engineers
Page 86
BL Companies Michael G. Fisher PE provides comprehensive engineering and planning services and studies. Some of the services required by this project include hydrogeological, structural, mechanical, geotechnical, pavement engineering, construction services, land surveying, water supply, distribution and treatment design, water pollution control engineering environmental management and planning, transportation engineering, plumbing, electrical. BL Companies worked on the following projects under this contract: Leslie Drive Sewer Bridge Replacement and the Channel Improvements from Bradley/Coe Avenue Bridges to Cooper Street Bridge. On-Call Structural Engineering Services Trumbull, CT Served as Project Manager of this contract with the Town of Trumbull for on-call structural services. This contract administered under the Trumbull Department of Public Works involved providing comprehensive structural services including professional engineering, bridge design, steel design, concrete design, geotechnical, surveying, planning, construction inspection, utilities and other related professional services while assisting the Town with planning, design and construction of various structural related projects. Task-Based Engineering Services, Connecticut Department of Transportation Statewide, CT Served as Project Manager of this on-call contract to provide task-based engineering services to the Connecticut Department of Transportation’s State Design Unit to aid in the preparation of design plans, estimates, specifications, and related data and studies. BL Companies was responsible for survey, environmental documents and permit applications, soils engineering, hydraulic engineering, drafting, photography and graphics for public hearings, property mapping, stormwater discharge certification, contract processing, and typing and clerical functions for engineering studies and reports. BL Companies provided or are providing services under this contract for the following projects: Bridge Preservation Program; ARRA Administration, Liaison and Engineering Services; Stormwater General Permit Review Certification; Local Road Accident Reduction Program; Pavement Preservation Program Administration, Liaison and Engineering Services; Route 82 over Roaring Brook in Haddam; Reconstruction of CT Route 219 at Johnnycake Lane in New Hartford, and Intersection Improvements of Routes 57 and 136 in Westport. Arch Street Complete Streets Improvements Project New Britain, CT Serves as the Quality Control/Quality Assurance Professional for design services and the preparation of Design Plans, Special Provisions and Bid Documents for the Arch Street Complete Streets Improvements Project, funded for construction through the LOTCIP Program. The proposed improvements for Arch Street utilize a “Complete Streets” design approach, including elements such as brick pavers, ornamental street lighting, street trees, placemaking elements, and the addition of mid-block pedestrian crossings and sidewalk widening to help encourage activities such as outdoor dining. These curb extensions will reduce vehicle speeds and crossing distances, allow for outdoor dining areas and provide space for street trees, planters, and other enhancements.
Page 87
BL Companies Joshua Wheeler PLA Project Manager II Summary of Qualifications Mr. Wheeler brings 23 years of experience in Landscape Architecture and Project Management, specializing in residential developments, commercial and retail projects, and public redevelopment initiatives. His expertise includes site analysis, layout and design, construction documentation, and construction administration. As a Project Manager II at BL Companies, Josh is responsible for designing, preparing, and overseeing the development of comprehensive site plans, grading plans, planting plans, detailed design plans, erosion control measures, streetscape road plans, and associated profiles and cross-sections. Additionally, he collaborates with the Project Manager to foster and maintain strong client relationships, ensuring seamless project execution and client satisfaction. Relevant Experience Camp Fogarty Running Track, Rhode Island Army National Guard East Greenwich, RI Served as Senior Landscape Architect for the new running track at Camp Fogarty for the Rhode Island Army National Guard. BL Companies is preparing a complete set of biddable documents that meet all local, state, federal, and international codes, rules, and regulations for the construction of a running track on Camp Fogarty. Physical fitness is a paramount requirement for the training of Soldiers. Army regulations require all Soldiers to meet certain height/weight standards and pass a physical fitness test at least annually. The ability to meet a time standard for a known distance run is one of the events every Soldier must pass. Providing venues to train for the run event is an organizational priority. A closed, measured distance running course was identified as a need in a recent area development planning charrette. The area development plan calls for a ~400 meter measured running track to be located around the Camp Fogarty Parade Field. Portsmouth High School Tennis Courts Portsmouth, NH Served as Senior Landscape Architect and created construction documents and bid specifications for alterations and repairs to convert 4 courts to six and add new court lighting at Portsmouth High School. Compiled an Evaluation Report that contained an existing conditions HIGHLIGHTS YEARS IN THE INDUSTRY 23 EXPERTISE Landscape Architecture Project Management PROJECT ROLE Project Manager EDUCATION Bachelor of Landscape Architecture, Minor in Biology, University of Rhode Island, 2003 REGISTRATIONS Professional Landscape Architect: CT, RI
Page 88
BL Companies Joshua Wheeler PLA investigation along with recommendations on specific renovations and upgrades that were required. Also included was a comprehensive cost breakdown of all recommended improvements. Classical High School Synthetic Field Providence, RI Served as Staff Landscape Architect for this multi-purpose sports field at Classical High School. The field combined football, soccer, lacrosse, field hockey and softball on it with 5 full size tennis courts adjacent. Project responsibilities included preliminary site design through construction documentation, specific attention to grading plans, project specifications and construction supervision. Francis Walsh Intermediate School Athletic Field Improvements Branford, CT Served as Landscape Architect for the revitalization of the outdoor areas at Francis Walsh Intermediate School, focusing on the multi-use athletic fields and softball field to enhance physical education, athletics, recess, and environmental enrichment. Building on previous renovations completed in 2021, this project introduced universal accessibility, update outdated elements, and add new features to enrich both the school and broader community. Provided athletic field design and construction administration services, delivering key improvements such as replacing the existing recess swing structures and adding new playscape elements. The project also involved removing the aerial ropes course and baseball field, installing a regulation basketball court and half court, re-grading the softball outfield, and creating accessible pathways throughout the site. Two natural turf fields were converted to synthetic turf with lighting and seating, and the existing running track was replaced with a three-lane walking track. Additional upgrades included a seasonal restroom area, enhancements to the wetland buffer with naturalized plantings, rain gardens (bioretention), and a pollinator garden. An outdoor classroom and environmental education area were also introduced. These comprehensive enhancements transformed the school’s outdoor spaces into a modern, accessible, and sustainable environment for both student activities and community use. Eldredge Elementary School Softball Field and Basketball Courts Renovation East Greenwich, RI Served as Landscape Architect for the renovation of the athletic facilities at Eldredge Elementary School, focusing on upgrading both the softball and basketball fields. The project involved replacing the existing, outdated fields with new, high-quality athletic surfaces to enhance playability and safety. Mr. Wheeler also designed a new pergola gathering space adjacent to the fields, providing a shaded area for community use. For the softball field, he developed a comprehensive irrigation system to ensure efficient water use and maintain optimal field conditions. The basketball court received a new, durable play surface, improving its longevity and usability. In addition, the ADA accessibility was enhanced throughout the site, ensuring that all students and community members could enjoy the facilities. These upgrades transformed the school’s outdoor areas into modern, functional, and inclusive spaces for recreation and learning. Hope High School Basketball Renovation Providence, RI Served as Project Manager for the site analysis, design development, and construction documentation for the Hope High School Basketball Renovation in Providence, RI. Initiated the project with a detailed Data Accumulation Survey, including topographic mapping, utility identification, and establishment of control points, all in accordance with state technical standards.
Page 89
BL Companies Ken Radziwon PE Senior Project Manager Summary of Qualifications Mr. Radziwon brings over 18 years of diverse experience in transportation and civil engineering with a focus on public infrastructure. His expertise spans highway and roadway design, roundabouts, bicycle and pedestrian facilities, intersection design, drainage solutions, and the implementation of complete streets concepts. Ken is also skilled in streetscape improvements, permitting applications, construction administration, and navigating construction practices. He has an in-depth understanding of Connecticut Department of Transportation procedures and permitting processes, as well as programs such as LOTCIP, Community Connectivity, TA, STEAP, and DEEP Recreation Trails guidelines. His comprehensive knowledge of roadway and traffic signal construction further enhances his ability to deliver successful projects. In addition to his engineering background, Ken expanded his municipal expertise as the Director of Public Works for the Town of Ellington. In this role, he managed daily operations, maintenance, budgeting, and staffing for the department. He also served as the town’s Water Pollution Control Authority Administrator, Tree Warden, Local Traffic Authority, and ex- officio member for several boards. Relevant Experience Tennis Facility, University of Connecticut Storrs, CT Served as Project Manager for a new athletic building along Avalonia Way adjacent to the existing Tennis Court facility. The project team designed a precast concrete modular building equipped with water, gas, sewer, heat, telephone and data. The building provides on-site locker facilities, athlete restroom, public restroom, coaches/officials restroom/changing room, flex office/meeting space and support space (i.e. janitorial, MEP equipment). The project also proposed on-street parallel parking with improved ADA pedestrian access, site landscaping and a rain garden. HIGHLIGHTS YEARS IN THE INDUSTRY 18 EXPERTISE Transportation Civil Engineering Public infrastructure PROJECT ROLE Quality Assurance / Quality Control EDUCATION Bachelor of Science in Civil Engineering, University of Hartford, 2008 REGISTRATIONS Professional Engineer: CT PROFESSIONAL MEMBERSHIPS American Society of Civil Engineers CT ITE
Page 90
BL Companies Ken Radziwon PE Sanitary Sewer Relocations Along U.S. Route 1 Orange, CT Serves as Project Manager for the sewer relocations required for State Project 106-108 in Orange, CT. CTDOT is widening U.S. Route 1 in Orange, which requires new drainage structures. The proposed location of these structures created several conflicts with the existing sanitary sewer system. Our Team is working alongside the Town of Orange WPCA to implement their design standards for the relocations that are required due to proposed conflicts. Our Team is also working closely with CTDOT to develop solutions to minimize impacts wherever feasible. Our scope of work is to prepare the relocation design plans, specifications and cost estimate for the work. Civil Design, Durham Meadows Waterline Road Durham, CT Served as Project Engineer for EPA funded project to bring a new water main into the Town of Durham, CT. Designed the civil roadway work of the water main and coordinated with town officials. Performed the water tank site design including drainage and grading. Also, executed the horizontal and vertical geometry for an access road to said tank site. West Main Street Pedestrian Connectivity & Safety Improvements New Britain, CT Serves as Project Manager in order to coordinate design services, public outreach, and the prepare design plans, special provisions and bid documents for the West Main Pedestrian Connectivity & Safety Improvements Project. The project is funded for construction through the Community Connectivity Program via the Office of Policy & Management. The improvements proposed for the project are meant to provide safer pedestrian connectivity, increased accessibility, improved operations for vehicular travel and will enrich surrounding neighborhoods. The proposed improvements include replacement of the existing concrete sidewalk along with a new brick paver shelf or turf establishment, concrete sidewalk ramps, concrete driveway ramps, resetting and/or replacement of curbing, new catch basin tops, addition of street trees along West Main Street and line striping as appropriate. Arch Street Complete Streets Improvements Project New Britain, CT Serves as Project Manager for design services, public outreach, and the preparation of Design Plans, Special Provisions and Bid Documents for the Arch Street Complete Streets Improvements Project, funded for construction through the LOTCIP Program. The proposed improvements for Arch Street will utilize a “Complete Streets” design approach, including elements such as brick pavers, ornamental street lighting, street trees, placemaking elements, and the addition of mid-block pedestrian crossings and sidewalk widening to help encourage activities such as outdoor dining. These curb extensions will reduce vehicle speeds and crossing distances, allow for outdoor dining areas and provide space for street trees, planters, and other enhancements. Highwood Farms Roadway Evaluation Thomaston, CT Served as Project Manager responsible for the evaluation of several roadways within the Highwood Farms neighborhood. Our Team evaluated the condition of the existing roadways and created a report with our findings. The report provided recommendations for how best to rehabilitate the existing roadways by completing pavement and subbase cores and providing backup based on best engineering practices. This report was used as the basis for future planning for Capitol projects for the Town.
Page 91
BL Companies Dominick J. Celtruda PLA, ASLA Principal Landscape Architect Summary of Qualifications Mr. Celtruda is a seasoned professional with over 28 years of experience in planning, design, construction, and maintenance of corporate, commercial, institutional, educational, and municipal sites. Dominick’s expertise includes conducting in-depth studies to identify and quantify key factors that inform the planning and design process, ensuring spaces are thoughtfully shaped for optimal use and enriched social and cultural interaction. Mr. Celtruda specializes in site analysis, concept development, schematic design, design development, contract documentation, construction detailing, bidding, construction administration, project management, presentation graphics, and the creation of design guidelines. As Principal Landscape Architect at BL Companies, he provides expert landscape architecture and liaison engineering services to a diverse portfolio of public and private clients. Relevant Experience Francis Walsh Intermediate School Athletic Field Improvements Branford, CT Served as Project Manager for the revitalization of the outdoor areas at Francis Walsh Intermediate School, focusing on the multi-use athletic fields and softball field to enhance physical education, athletics, recess, and environmental enrichment. Building on previous renovations completed in 2021, this project introduced universal accessibility, update outdated elements, and add new features to enrich both the school and broader community. Provided athletic field design and construction administration services, delivering key improvements such as replacing the existing recess swing structures and adding new playscape elements. The project also involved removing the aerial ropes course and baseball field, installing a regulation basketball court and half court, regrading the softball outfield, and creating accessible pathways throughout the site. Two natural turf fields were converted to synthetic turf with lighting and seating, HIGHLIGHTS YEARS IN THE INDUSTRY 28 EXPERTISE Landscape Architecture Master Planning PROJECT ROLE Landscape Architecture EDUCATION AAS, Landscape Development, SUNY College, 1994 Bachelor of Landscape Architecture, SUNY College, 1997 REGISTRATIONS Professional Landscape Architect: CT, MA, ME, NC, NH, NJ, NY, OH, RI, SC, TN, TX PROFESSIONAL MEMBERSHIPS CT Landscape Architecture Board, Commissioner American Society of Landscape Architects, CT Chapter, Member
Page 92
BL Companies Dominick J. Celtruda PLA, ASLA and the existing running track was replaced with a three-lane walking track. Additional upgrades included a seasonal restroom area, enhancements to the wetland buffer with naturalized plantings, rain gardens (bioretention), and a pollinator garden. An outdoor classroom and environmental education area were also introduced. These comprehensive enhancements transformed the school’s outdoor spaces into a modern, accessible, and sustainable environment for both student activities and community use. Plymouth High School Plymouth, CT Served as Design Landscape Architect, assisting with contract documents and contract administration services for the new high school. The design included 250 parking spaces; bus and parent drop-off areas; site layout; an athletic complex consisting of a baseball field, football field/soccer field, running track, and softball field; utility plan; grading plan; erosion and sediment control plan; planting plan; and stormwater management plan. Eldrege Elementary School Softball Field and Basketball Courts Renovation East Greenwich, RI Served as Project Manager who contributed to the renovation of the athletic facilities at Eldredge Elementary School, focusing on upgrading both the softball and basketball fields. The project involved replacing the existing, outdated fields with new, high-quality athletic surfaces to enhance playability and safety. Was responsible for the design of a new pergola gathering space adjacent to the fields, providing a shaded area for community use. For the softball field, he developed a comprehensive irrigation system to ensure efficient water use and maintain optimal field conditions. The basketball court received a new, durable play surface, improving its longevity and usability. In addition, he worked to enhance ADA accessibility throughout the site, ensuring that all students and community members could enjoy the facilities. These upgrades transformed the school’s outdoor areas into modern, functional, and inclusive spaces for recreation and learning. Guilford High School Tennis Courts Guilford, CT Served as Landscape Architect and created bid specifications for alterations and repairs to six tennis courts at Guilford High School. Compiled an Evaluation Report that contained an existing conditions investigation along with recommendations on specific renovations and upgrades that were required. Also included was a comprehensive cost breakdown of all recommended improvements. The analysis also incorporated the use of Quick Start Courts (youth tennis courts). East Hartford High School Tennis Courts East Hartford, CT Served as Landscape Architect and created bid specifications for alterations and repairs to eight tennis courts at East Hartford High School. Compiled an Evaluation Report that contained an existing conditions investigation along with recommendations on specific renovations and upgrades that were required. Also included was a comprehensive cost breakdown of all recommended improvements. The analysis also incorporated the use of Quick Start Courts (youth tennis courts). Portsmouth High School Tennis Courts Portsmouth, NH Served as Project Manager and created construction documents and bid specifications for alterations and repairs to convert 4 courts to six and add new court lighting at Portsmouth High School. Compiled an Evaluation Report that contained an existing conditions investigation along with recommendations on specific renovations and upgrades that were required. Also included was a comprehensive cost breakdown of all recommended improvements.
Page 93
BL Companies Christen Robbins AIA, LEED AP, MBA Senior Project Manager Summary of Qualifications With 18 years of experience in architecture and project management, Christen brings a wealth of expertise across a diverse range of industries, including multi-family housing, self-storage, retail, higher education, hospitality, healthcare, and commercial projects. As a Project Manager at BL Companies, Christen excels in overseeing the entire project delivery process, ensuring every project meets the client’s design vision, stays on schedule, and remains within budget. Christen’s role also involves providing technical expertise and conducting thorough quality control reviews, resulting in well- coordinated and constructable project documents. Passionate about delivering exceptional results, Christen combines strategic oversight with a deep understanding of design and construction to bring every project to life with precision and excellence. Relevant Experience University of Connecticut Tennis Locker Room Storrs, CT Served as Architectural Project Manager/Project Architect for a new athletic building along Avalonia Way adjacent to the existing Tennis Court facility. The project is to install a precast concrete modular building equipped with water, gas, sewer, heat, telephone and data. The building provides on-site locker facilities, athlete restroom, public restroom, coaches/officials restroom/changing room, flex office/meeting space and support space (i.e. janitorial, MEP equipment). The project also proposes to construct parking with improved pedestrian access should funding accommodate this additional work. Design documents were completed in early 2025 with construction completed at the end of 2025. HIGHLIGHTS YEARS IN THE INDUSTRY 18 EXPERTISE Architecture Project Management Multi-Family, Self-Storage, Healthcare PROJECT ROLE Architecture EDUCATION Bachelor of Architecture, Roger Williams University, 2006 Master of Business Administration, Post University, 2021 REGISTRATIONS Registered Architect: CT (2022); MA (2022); NJ (2022); RI (2011) PROFESSIONAL MEMBERSHIPS American Institute of Architects (AIA) NCARB USGBC LEED AP BD+C
Page 94
BL Companies Christen Robbins AIA, LEED AP, MBA Peckham Farms and Hart House Kingston, RI Served as Project Manager/Project Architect for the renovation of the buildings at Peckham Farms and Hart House for accessibility upgrades. The project included the renovation of bathrooms to be ADA compliant and the construction of a ramp on the exterior to provide accessible access at both buildings Osborn Hill Elementary School Fairfield, CT Architectural Project Manager and Architect of Record for an $8.1 million renovation of a 55,000 square foot elementary school. Mechanical, electrical, plumbing, fire protection, architectural, structural, and civil design services associated with new HVAC systems to serve 32,000 square feet of the school. New systems included packaged rooftop air-handling units, packaged dedicated outside air systems (DOAS), variable refrigerant flow (VRF) systems, building management system (BMS) upgrades throughout the facility, structural modifications to support mechanical equipment, new electrical service, lighting, ceilings, and security vestibules. Design services were completed in 2024 Stonington YMCA Conversion Stonington, CT Serving as Project Manager/Project Architect for the conversion of an existing movie theater into a YMCA pickleball court complex and a 5,000 SF space for residential amenities. Responsibilities include programming of the existing building, design of the exterior, and coordination with the various stakeholders. Further, responsibilities included completion of a demolition package for pricing and will support through the site entitlement. Fairfield Warde High School Fairfield, CT Architectural Project Manager and Architect of Record for a $36 million renovation of a 318,000 square foot high school. Mechanical, electrical, plumbing, fire protection, architectural, structural, and civil design services associated with new HVAC systems to serve 142,000 SF of the school. Montgomery Community College Recreation Complex PA Served as Architectural Project Manager for the design of a restroom building to serve the surrounding athletic fields. Coordinated with civil and landscape teams for masterplanning of the field complex, identifying the building’s footprint and square footage, orientation, access, and integration with the landscape. Architecture services included conceptual floor plan, exterior elevations, and concept rendering. Roger Williams Parks – Facility Assessments: Historic Structures: Casino, Boathouse, Temple to Music Providence, RI Served as Project Manager for the facility assessment of three historic structures with the Roger Williams Park complex. Project responsibilities included observations of the existing structures to identify repairs or modifications, managing of the completion of the report, design, and documentation of a café concept, and estimating of the work to be completed. Design services were completed in 2020.
Page 95
BL Companies Christopher Albino PE Manager of Structural Engineering Summary of Qualifications Mr. Albino is a highly accomplished Structural Engineer with over 34 years of experience delivering innovative and efficient design solutions across the public and private sectors. His expertise encompasses the structural design of a diverse range of projects, including retail, industrial, municipal, and residential buildings, ensuring durability, safety, and compliance with industry standards. In addition to his structural engineering proficiency, Mr. Albino brings extensive experience in project management, photovoltaic design, site development, roadway design, and geotechnical investigations. His multidisciplinary knowledge and strategic approach enable him to drive complex projects to successful completion while maintaining the highest standards of quality and performance. Relevant Experience Eastern Connecticut State University, Softball Field Willimantic, CT Served as Manager of Structural Engineering for the design of dugouts and concession building for this college softball field. Project responsibilities included management of the structural team during the design and construction of these structures, along with shop drawing review for the structural package. Coordination with the Architect, Civil Engineer and Landscape Architect was included in this project. Dunkin Donuts Park (Stadium for the Hartford Yard Goats) Hartford, CT Served as Manager of Structural Engineering for the re-design of the outfield seating levels and concourse for this 17,000-seat baseball stadium. Project responsibilities included client liaison and management of the structural team during the design and construction of this steel-framed precast seated structure with ground improvements. The schedule of this project demanded a “fast-track” approach to the design and shop drawing review for the structural package. Coordination with the design HIGHLIGHTS YEARS IN THE INDUSTRY 34 EXPERTISE Structural Engineering Project Management PROJECT ROLE Structural Engineering (Buildings) EDUCATION Bachelor of Science in Civil Engineering, REnsselaer Polytechnic Institute, 1990 REGISTRATIONS Professional Engineer: AL, AR, CO, CT, DE, DC, FL, GA, IN, KY, ME, MD, MA, MI, MO, NE, NH, NJ, NY, NC, OH, PA, RI, SC, TN, TX, VT, VA, WV, WI Canada: AB, BC, ON PROFESSIONAL MEMBERSHIPS Association of Professional Engineers and Geoscientiests of Alberta, Member NCEES Record Holder AISC ASCE
Page 96
BL Companies Christopher Albino PE Architect, the production Architect, the Contractor, the Owner and the City of Hartford was included in this project. Design services were completed in the Spring of 2017. Light Tower Assessment at Robert Palmer Field Waterbury, CT Manager of Structural Engineering for the structural analysis of several existing 80-foot- tall truss-type light tower stanchions for field lighting at the former minor league ballpark in Waterbury, CT. The analysis included a field investigation of the existing tower structural components, review of the original foundation design drawings, and preparing a structural model of the tower with various loading conditions. The deliverable was a report outlining our findings, and recommendations for upgrades or replacements. SEMA4 Stamford, CT Served as Senior Structural Engineer for design of the additions and alterations to the existing facility. This work included assessing the existing structure for the proposed conversion of existing office space to clinical laboratories, as well as the engineering required for the addition of an exterior loading dock and a freight elevator within the building. Studies of roof loadings were performed to assess the feasibility of a roof-top terrace. Additional responsibilities included flood calculations for the exterior loading dock, structural shop drawing review and structural construction administration. Southington Senior Center Southington, CT Served as Manager of Building Engineering for the design of a 22,600 SF senior facility. Project responsibilities included management of the structural and MEP team during the proposal and design of this steel-framed single-story structure, as well as QA/QC of the structural design. Municipal Solar Installations Multiple Locations in Newington, CT Served as Project Manager and Structural Engineer for the design of several 150 to 250kW roof-mounted solar arrays on the roof of existing municipal facilities, which will be tied into the building’s electrical service. As part of the work, a structural analysis of the existing roof was performed, to verify adequate capacity to carry the additional weight of the solar panels. The systems incorporated solar modules on proprietary racking with ballast blocks and will include electronic monitoring and metering for the utility company. Potential Re-use Analysis, Colony Street Meriden, CT Served as Manager of Structural Engineering for an adaptive re-use analysis of four historic buildings on Colony Street in downtown Meriden. Analysis included a conditions evaluation of the buildings’ structural framing systems, along with load rating of floor/roof structures. Elmwood Community Center Waterbury, CT Served as Manager of Structural Engineering for the structural design of this 2-story community building in a dense neighborhood in Waterbury, CT. Responsible for the design and preparation of construction documents for this wood-framed structure.
Page 97
BL Companies Brian Reilly PE Senior Engineer II Summary of Qualifications Mr. Reilly is a highly accomplished Senior Engineer with over 15 years of expertise in civil and bridge engineering, specializing in bridge design, load rating, and inspections. His extensive skill set encompasses bridge design and rating, structural inspections, construction oversight, and project management. Throughout his career, Mr. Reilly has successfully administered and managed complex bridge design projects, overseeing key aspects such as project scoping and agreements, scheduling, budget management, environmental permitting, rights-of-way coordination, and utility management. In his current role at BL Companies, Mr. Reilly takes the lead in designing primary structural bridge components, developing detailed contract drawings and construction specifications, and conducting rigorous reviews of structural calculations, cost estimates, and technical reports. Additionally, he serves as a consultant liaison engineer, providing expert guidance and ensuring seamless administration of bridge design projects. With his extensive experience and hands-on approach, Mr. Reilly consistently delivers innovative and reliable engineering solutions, driving the success of infrastructure projects from concept to completion. Relevant Experience Main Street over Rippowam River Stamford, CT Served as the Senior Bridge Engineer for the Main Street Bridge over Rippowam River for the City of Stamford. This project involved performing a Bridge Study of the 136-year-old historic two-span wrought iron pin-connected lenticular pony-truss supported by stone masonry abutments and center pier, with eight intermediate concrete piers. The Main Street bridge located in the busy downtown Stamford has been closed to all traffic for several years due to its condition, had been slated to be replaced in the past, however, public outcry has halted any movement on this project over the past 25 years. BL prepared HIGHLIGHTS YEARS IN THE INDUSTRY 15 EXPERTISE Bridge Engineering Civil Engineering PROJECT ROLE Structural Engineering (Bridges) EDUCATION Bachelor of Science in Civil Engineering, University of New Haven, 2010 REGISTRATIONS Professional Engineer: CT, MA RI NCEES Recordholder PROFESSIONAL MEMBERSHIPS NHI - Safety Inspection of In-Service Bridgees, 2017 NHI -Bridge Inspection Refresher Training, 2020
Page 98
BL Companies Brian Reilly PE a bridge study with alternative concept plans for replacement, rehabilitation, and removal including construction costs, and a decision matrix with a report reviewing various design considerations of each alternative. This project required special attention working with historians to carefully consider historical and cultural implications of each alternative. Ash Creek Pedestrian Bridge and Multi-Use Trail Bridgeport, CT Serves as a Senior Engineer for the Ash Creek Bridge and Multi-Use Trail project which will provide a 225-foot landmark pedestrian bridge spanning Ash Creek between the City of Bridgeport and Town of Fairfield. Project responsibilities include preparation and review of design calculations, Plans, Specifications, estimates to develop contract documents. Replacement of Bridge No. 158-021, Kings Highway North over Willow Brook Westport, CT Served as the Lead Design Engineer for the replacement of the Kings Highway North Bridge over Willow Brook for the Town of Westport under the Connecticut Department of Transportation’s State Local Bridge Program. This project involved the replacement of the existing historic single-span masonry bridge with a 22’ three-sided ridged frame on a spread footing. The project required special attention to aesthetics due to the historic sensitivity, water handling details, structural design and details for the bridge and wingwall replacement, and roadway design and details. The project also requires hydrologic and hydraulic analysis, drainage analyses, rights- of-way, utility, and permit coordination in the environmentally and historically sensitive tidal marsh of Westport, CT. Louisiana Avenue Bridge Replacement (SPN 17-188) Bristol, CT Served as a Lead Design Engineer for the replacement of the Louisiana Avenue Bridge over Coppermine Brook for the City of Bristol under the Connecticut Department of Transportation’s Federal Local Bridge Program. This project involved the replacement of the existing two-span bridge with a 49’-6” single span voided slab bridge. The project required water handling details, structural design and details for the bridge replacement, construction staging plans, and roadway design and details. The project also requires hydrologic and hydraulic analysis, drainage analyses, rights-of-way, and utility coordination. Project responsibilities included development assisting in the design and detailing of structural components plan drafting and review, preparation of special contract provisions, and developing and reviewing the cost estimate for construction. Humphrey Street Bridge Rehabilitation New Haven, CT Served as the Lead Design Engineer for the rehabilitation of the Humphrey Street Bridge over Mill River for the City of New Haven under the Connecticut Department of Transportation’s State Local Bridge Program. This project involves a bridge inspection, conditional assessment, and rehabilitation design of an existing three-span 84-foot voided slab deck unit bridge that was originally constructed in 1908. The project requires water handling details, scour countermeasure work, structural design and details for the bridge rehabilitation, and construction staging plans. The project also requires hydrologic analysis, rights-of-way, utility, and permit coordination.
Page 99
BL Companies Steven Fraysier PE Senior Project Manager Summary of Qualifications Mr. Fraysier is a seasoned transportation and infrastructure design professional with 17 years of experience in the public sector. He has successfully designed and managed numerous State and Municipal projects, as well as select private developments. His technical expertise spans horizontal and vertical roadway design, superelevation, roadside safety features, multi- use trails, and construction sequencing. He also leads the development of cost estimates, special provisions, property maps, and various project reports, ensuring accuracy and compliance with industry standards. As a Senior Project Manager at BL Companies, Mr. Fraysier plays a pivotal role in project planning, budgeting, and execution. He develops scopes of work, fee proposals, and project schedules while managing budgets and progress reporting. He is adept at coordinating with State agencies, municipal governments, utility companies, consultants, and property owners to facilitate seamless project delivery. His expertise in MicroStation, InRoads, AutoCAD Civil 3D, Microsoft Project, and roadway quantity computations further enhances his ability to oversee complex infrastructure projects with precision and efficiency. Relevant Experience Pawcatuck Sidewalk Improvements Stonington, CT Served as Senior Project Manager for the project. The project consisted of sidewalk enhancements to South Broad Street (U.S. Route 1) between Spellman Avenue and Mayflower Avenue in the Pawcatuck neighborhood of Stonington. The purpose of the project was to complete gaps in sidewalk accessibility within the project limits. BL performed a mobility analysis to investigate improvements for bicyclists and performed a traffic analysis to investigate the removal of a left turn lane to facilitate sidewalk construction. The project was scoped to provide up through a preliminary design, including public outreach. Project responsibilities included scope and fee development, oversight of multiple disciplines (sidewalk design, survey, traffic design), maintaining close contact with the Town throughout the HIGHLIGHTS YEARS IN THE INDUSTRY 17 EXPERTISE Transportation Infrastructure Design Project Management PROJECT ROLE Transportation Engineering EDUCATION Bachelor of Science in Civil Engineering, University of Hartford, 2008 REGISTRATIONS Professional Engineer: CT, MA, RI PROFESSIONAL MEMBERSHIPS American Society of Civil Engineers, Member Connecticut Society of Civil Engineers, Member
Page 100
BL Companies Steven Fraysier PE development of the scope, fee; coordination with CTDOT District 2; Managing survey, sidewalk, and traffic design teams to meet client deadlines for a Preliminary design submission. International Drive Reconstruction Windsor, CT Serves as Project Manager II for work associated with the roadway reconstruction of approximately 4,800 LF of International Drive from Rainbow Road to Route 20. The existing roadway along International Drive is deteriorating and seeing subbase failures due to the large volume of heavy vehicles that utilize the corridor on a daily basis. Pavement sections were designed to efficiently increase the durability and sustainability of the proposed corridor for the heavy traffic volumes. The project was designed to have two (2) construction phases in order for the Town to secure the appropriate funding to complete construction. Project responsibilities include overseeing the development of construction plans, profile and cross sections, cost estimation, and development of standard specifications. Stratfield Road at Fairfield Woods Intersection & Corridor Streetscape Improvements Fairfield, CT Served as Senior Project Manager for the design improvements along the Route 59 (Stratfield Road) corridor from Owen Fish Park to Montauk Street. The project was funded partially by Urban Act grant funds and required approval by CTDOT through the encroachment permit review process. Proposed improvements included new sidewalks and sidewalk ramps, signal improvements at the Fairfield Woods Road & Stratfield Road intersection, decorative pedestrian lighting design, and landscaping and complete street improvements like on-street parking accommodations. Silas Deane Highway Pedestrian Improvements Phase III Rocky Hill, CT Served as Project Manager for the project. The project consisted of streetscape enhancements to the Silas Deane Highway / Main Street (Route 99) including replacement of the sidewalk within the project limits, pedestrian level lighting adjacent to the new sidewalks, decorative landscape canopy trees and plantings that are appropriate for utility corridors, and pedestrian amenities such as bus shelters and benches. Project responsibilities included scope and fee development, oversight of multiple disciplines (landscape design, survey, sidewalk/roadway design), maintaining close contact with the Town throughout the development of the scope, fee, and municipal agreement with the Connecticut Department of Transportation; Managing survey, roadway, landscape, and electrical/illumination design teams to meet client deadlines for Preliminary and Final Plans for Review design submissions; Utility coordination. Design Services are complete. Bloomfield Greenway Multi-Use Trail Bloomfield, CT Served as Project Manager for the transportation design team during the design and construction of a three-mile long multi-use trail in the Town of Bloomfield that will eventually serve as a connection to the East Coast Greenway trail system. Design of the trail had several restrictions including reducing wetland impacts, limiting private property impacts and accommodating the existing overhead utility corridor through which the trail passes.
Page 101
BL Companies Michael Dion PE, PTOE Senior Project Manager Summary of Qualifications Michael brings over 27 years of expertise in traffic engineering and transportation planning. As a Senior Project Manager at BL Companies, he oversees and manages the entire project delivery process, including planning, scheduling, scope, and budgeting, ensuring seamless execution and client satisfaction. Mr. Dion has served as the traffic project lead on a wide range of initiatives, including major highway and roadway improvements, realignments, intersection upgrades, resurfacing, and safety enhancements. He is highly proficient in CTDOT and FHWA Design Standards and the preparation of all necessary project documentation. His technical expertise spans traffic signal design, traffic impact studies, capacity and level-of-service analysis, safety and crash analysis, traffic simulation modeling, roadway lighting design, maintenance and protection of traffic planning, pavement marking, and signing design. With a comprehensive understanding of traffic analysis tools such as SYNCHRO, Highway Capacity Software, TSDWIN, Highway Safety Analysis software, SimTraffic, and lighting design software including Visual and AGI32, Mr. Dion delivers data-driven, innovative solutions tailored to project needs. Relevant Experience Fred Wolfe Park Access Parking and Safety Study Orange, CT Served as Traffic Lead to develop an access, parking and safety study for town-owned lands, referred to as Fred Wolfe Park. The project included working with the Town of Orange, Fred Wolfe Park commission, and stakeholders to review access, circulation and parking and to provide safety recommendations for the park in terms of pedestrian, bicycle, and motor vehicles. Specifically, it related to a new playground / playscape, and associated improvements that were implemented by the Town. HIGHLIGHTS YEARS IN THE INDUSTRY 27 EXPERTISE Traffic Engineering Transportation Planning State and Municipal Infrastructure PROJECT ROLE Traffic Engineering EDUCATION Bachelor of Science in Civil Engineering, University of Rhode Island, 1998 REGISTRATIONS Professional Engineer: CT, FL, KY, MA, NH, NJ, NC, OR, PA, RI, SC Professional Traffic Operations Engineer PROFESSIONAL MEMBERSHIPS Institute of Transportation Engineers
Page 102
BL Companies Michael Dion PE, PTOE 360 Degree Video Detection System – Phase 1 and 2 Stamford, CT Serves as Project Manager on this complete street project in the City of Stamford, Connecticut. Work for this LOTCIP (Local Transportation Capital Improvements Program) Project was done CTDOT and City of Stamford Traffic Signal standards. Work included the CAD drafting of video detection system installations at 91 City owned signals and oversaw the implementation of an adaptive signal system design on West Main Street (10 signals). Hope Street Improvement Project Stamford, CT Served as Project Engineer responsible for performing traffic analysis of three interconnected intersections utilizing SYNCHRO (Version 7) traffic signal coordination software. Prepared three traffic signal plans to City of Stamford standards including special provisions and cost estimates. Including special provisions and cost estimates. Northford Center Connectivity Study, SCRCOG North Branford, CT Serves as Project Manager for a connectivity improvement study in the Town of North Branford, CT. BL Companies has been commissioned by the South Central Regional Council of Governments (SCRCOG) and Town of North Branford to provide planning services and a study for connectivity improvements in Northford Center. The team is working with SCRCOG, the Town of North Branford, Connecticut Department of Transportation (CTDOT) and community stakeholders to incorporate the vision for the Northford Center, which aims to accommodate multiple modes of transportation, while addressing safety and congestion issues for the neighborhood and visitors alike. Route 229 Corridor Study, Naugatuck Valley Council of Governments Southington / Bristol, CT Served as Project Manager for a transportation planning study of six miles of CT Route 229 in Southington and Bristol, CT. The study addressed safety, congestion, the transit system, and pedestrian/bicycle mobility and assessed travel demand growth and its potential impacts to area roadways, including traffic associated with development of underutilized properties within the Study Area. Traffic Signal Design at Rubber Avenue and Melbourne Avenue/Hoadley Street Intersection Naugatuck, CT Served as Project Manager for a traffic signal design project at the intersection of Rubber Avenue and Melbourne Avenue/Hoadley Street. As Project Manager, he oversaw the final submittal of the bid documents for the Borough of Naugatuck. The project involved survey, capacity analysis of the existing skewed intersection and development of traffic signal plans for a complete replacement of the existing traffic signal hardware including controller cabinet and signal heads, while calling for new vehicle detectors, pavement markings and pedestrian signal phase. The project also includes the addition of some limited streetscape elements like sidewalk and handicap ramps as well as recommendations of drainage improvements at the intersection.
Page 103
BL Companies Robert Roles PE Principal Engineer Summary of Qualifications With decades of experience, Mr. Roles combines technical engineering knowledge with strong public communication skills. His capabilities in utility design, site planning, and infrastructure development ensure effective and reliable project outcomes. Mr. Roles brings 30 years of engineering experience, including more than 15 years dedicated to civil engineering. His expertise spans site layout and subdivision design, utility assessments and relocations, and comprehensive roadway design. He is adept at presenting engineering concepts and plans to public forums, local commissions, and approval agencies. Mr. Roles’ extensive background includes the analysis and design of stormwater and septic systems, as well as the inspection and design of water and sewer utilities, flood protection infrastructure, and roadways. His ability to manage both technical execution and public communication makes him a valuable asset in complex civil projects. Relevant Experience Francis Walsh Intermediate School Athletic Field Improvements Branford, CT Served as Civil/Site Engineer of Record for the revitalization of the outdoor areas at Francis Walsh Intermediate School, focusing on the multi-use athletic fields and softball field to enhance physical education, athletics, recess, and environmental enrichment. Building on previous renovations completed in 2021, this project introduced universal accessibility, update outdated elements, and add new features to enrich both the school and broader community. Grading and drainage designs for multiple use fields utilizing Low Impact Design Elements and Best Management Practices to provide fully accessible, modern athletic areas in a natural/ sustainable setting while improving stormwater management and water quality. Provided design services and construction administration throughout the project. HIGHLIGHTS YEARS IN THE INDUSTRY 30 EXPERTISE Civil Engineering PROJECT ROLE Civil Engineering EDUCATION Bachelor of Science, General Engineering, University of New Haven, 2005 Bachelor of Science, Civil Engineering, University of New Haven, 2005 REGISTRATIONS Professional Engineer: CT, MA, NY, PA PROFESSIONAL MEMBERSHIPS American Society of Civil Engineers
Page 104
BL Companies Robert Roles PE Land Development Project Stratford, CT Civil/Site Engineer of Record for a 200-acre site development that involves expensive environmental cleanup/capping. The site is also being designed for flood resiliency and will also involve the coordinated decommissioning of six stormwater pump stations, the design of one new stormwater pumping station and the replacement of a sewer pump station. Production of phased construction plans and SWPPP monitoring and permitting are ongoing. Site Design and Construction is underway and is expected to continue for several years. Camp Hartell Sewer Main Windsor Locks, CT Design of 2,150 feet of domestic sewer in coordination with the military base Master Plan. Peer Review Services Various Projects, Regulatory Authorities and Municipalities Provided Engineering Opinion and Standard of Care evaluations for various applications before several authorities having jurisdiction in multiple municipalities. Performed peer reviews of submittal packages inclusive of existing and proposed plans/details, design reports, calculations, geotechnical reports, and environmental reports. Reviewed prior board or commission meetings and/or findings, conducted site meetings with or without applicant’s design professionals and met with local conservation groups and concerned constituents. Provided the authority having jurisdiction with a written report detailing the proposed development and how it either meets currently adopted regulations and/or how the proposed work deviates from them. Presented our findings in public hearings and/or testified to them as needed. Uncas-on-Thames Roadway (Route 32) Norwich, CT Design of roadway, drainage modifications and utility relocations to provide STC mandated intersection improvements at the Uncas-On- Thames Hospital Campus. Coordinated through CTDOT and CT DPW. Route 82/ New London Turnpike Norwich, CT Design of roadway, drainage modifications, utility relocations and pedestrian walks along Route 82 and New London Turnpike in support of Three Rivers Community College expansion. Coordinated through the CTDOT and CT DPW. Water Main Relocation, South Norwalk Electric and Water Norwalk, CT Design Engineer for the analysis and design of temporary and permanent water mains for three bridges crossings over a widened section of Interstate 95. Project involved coordination with CTDOT, SNEW and a Norwalk streetscape project. Renovations to B-Lot and Additional Parking, Manchester Community College Manchester, CT Design Engineer and Construction Administrator for B-Lot Parking Lot Renovation. Design and permitting for complete parking lot renovation including LED lighting, electrical vehicle charging Stations, low maintenance rain gardens, dedicated bus drop off for Great Path Academy, as well as improvements to other parking lots on campus. Project involved coordination of sub consultants, coordination with the Connecticut State Colleges & Universities Board of Regents for Higher Education and CT DCS.
Page 105
BL Companies Donald Smith PLS Senior Project Manager - Survey Summary of Qualifications Mr. Smith brings over 30 years of extensive experience in surveying and mapping, serving diverse sectors including energy, public infrastructure, education, and commercial and residential development. His expertise spans land surveying, mapping, construction stakeout, and project management for complex projects such as bridges, large-scale building construction, educational facilities, pipelines, electric transmission lines, railroads, and major retail centers. As a Senior Project Manager at BL Companies, Mr. Smith plays a pivotal role in executing and overseeing boundary and topographic surveys, construction stakeout, survey calculations, deed and title research, and ALTA/NSPS Land Title Surveys. He also leads the firm’s innovative 3D Laser Scanning and UAV Technology initiatives, having developed policies and procedures that enhance efficiency and precision in these services. His leadership and technical expertise ensure the successful execution of high-quality surveying and mapping solutions for a wide range of projects. Relevant Experience Raynham Middle School, Titicut Swamp Road Raynham, MA Served as Surveyor to complete layout of new construction of all structures, roadways, utilities and services, ball fields, detention basins and landscape features for new $30 million middle school. Meeting House Elementary School, LEED Silver Equivalent New Fairfield, CT Served as Senior Crew Chief for the land surveying services required for the design of additions and renovations to the existing 84,000 SF elementary school that houses grades 3 through 5. The project included the demolition of an existing 12,650 SF, single-story, butler-type building wing that had surpassed its useful life and the creation of a new academic wing. The school was renovated as new while fully occupied over a 30-month period. Survey services included boundary/ topographic survey and extensive utility investigation for an HIGHLIGHTS YEARS IN THE INDUSTRY 30 EXPERTISE Surveying Mapping Project Management PROJECT ROLE Land Surveying EDUCATION Associates of Civil Engineering/Structural, Bristol Community College, 2001 Bachelor of Arts in Earth Science, Southern Connecticut State University, 1993 REGISTRATIONS Licensed Land Surveyor: CT OSHA 10-Hour Outreach for Construction FAA UAS Remote Pilot License PROFESSIONAL MEMBERSHIPS CT Association of Land Surveyors (CALS), Member
Page 106
BL Companies Donald Smith PLS on-site septic system. Norwich Technical High School Norwich, CT Served as Crew Chief responsible for the control establishment and construction stakeout on a large expansion to the campus facility. Stakeout of column lines, volume computations and providing elevations during the phased construction were a part of this work. Trumbull High School Trumbull, CT Served as Senior Project Surveyor responsible for the control establishment and construction stakeout computations for an auditorium addition. Primary tasks included verification of layout by contractor’s surveyors, baseline computations, column line and anchor bolt locations and verification. Churchill Place Reconstruction Dedham, MA Served as Senior Survey Project Manager for the land surveying and mapping required to support the design of the full-depth reconstruction of Churchill Place in-order-to transfer ownership of a private Right-of-Way to the Town of Dedham. The project includes survey, full-depth roadway reconstruction, new concrete sidewalks, drainage design and installation of granite property bounds. Shared Streets Improvements at St. James Avenue and Wellesley Street Springfield, MA Served as Project Manager on this pedestrian improvement project. Under a MassDOT Shared Streets Grant, BL Companies provided survey, traffic and transportation engineering services to the City of Springfield, MA. BL Companies’ survey services included preparation of an existing conditions topographic survey of the intersection and immediate area to support proposed engineering design of pedestrian and intersection improvements at the intersection of St. James Street at Wellesley Street. The purpose of this assignment was to improve the safety of pedestrians crossing St. James Street. Naugatuck Valley Council of Governments (NVCOG) Kinneytown Dam Project Ansonia and Seymour, CT Served as Senior Survey Manager of the land surveying and mapping services for the preparation of ALTA/NSPS Land Title Surveys for the three parcels totaling 170 acres owned by the Kinneytown Hydro Company, Inc. BL provided the final surveys of these parcels which extend over 2 miles along both sides of the Naugatuck River and the Metro North Waterbury Line railroad and included the reproduction of a large section of the town line between the City of Ansonia and the City of Seymour. In addition to ground survey, our FAA Part 107 licensed pilots flew the project corridor with our UAV to obtain video and photos of the dam and associated infrastructure and to create a high resolution georeferenced orthomosaic image for the project. The three ALTA/ACSM Land Title Surveys adjoined multiple subdivisions and required the reproduction of over a mile and a half of the CT Route 8 Right of Way and over 2 miles of the both sides of the existing Metro North Danbury Branch Railroad Right of Way.
Page 107
BL Companies David M. Cicia PE Principal Engineer Summary of Qualifications Mr. Cicia brings extensive expertise in transportation and hydraulic engineering, with a career spanning 27 years focused on hydrology, stormwater drainage design, roadway engineering, and environmental permitting for state, local, and private development projects. Mr. Cicia comprehensive experience encompasses all aspects of hydraulic and drainage design, as well as navigating complex environmental permitting processes. He is responsible for the development and review of hydrologic, hydraulic, and scour analyses, as well as storm sewer designs, FEMA Floodplain and Floodway analyses, and FEMA Letters of Map Revision (LOMRs). His work includes selecting appropriate design criteria, establishing analysis and design assumptions, and applying advanced modeling approaches and methodologies to deliver precise and effective solutions for transportation projects. With his deep technical knowledge and proven track record, Mr. Cicia consistently delivers innovative designs and ensures compliance with regulatory standards, driving the success of infrastructure initiatives across diverse sectors. Relevant Experience Deadman’s Brook Watershed Analysis and Myrtle Avenue Bridge Replacement Westport, CT Served as Principal Hydraulics Engineer for the analysis of the Deadman Brook watershed and Myrtle Avenue Culvert Replacement. The Deadman Brook watershed analysis resulted in recommendations for future improvements to the stream throughout Westport. The analysis included the hydrological macro-analysis of the whole stream, a planning level hydraulic analysis of required stream improvements along the course of the stream and a comprehensive list of recommendations for channel and structure improvements. The analysis and design of the Myrtle Avenue Culvert replacement included permitting and preparation of bid documents. HIGHLIGHTS YEARS IN THE INDUSTRY 27 EXPERTISE Transportation Engineering Hydraulic Engineering Environmental Permitting PROJECT ROLE Hydraulics & Drainage EDUCATION Bachelor of Science in Civil Engineering, University of Connecticut, 1998 REGISTRATIONS Professional Engineer: CT, MA
Page 108
BL Companies David M. Cicia PE Harbor Brook Trail and Channel Flood Mitigation Improvements, Bradley Avenue to Cooper Street Meriden, CT Served as Principal Hydraulics Engineer responsible for the hydraulic analysis and report preparation for the channel widening and lowering project designed to reduce flooding potential of Harbor Brook. The design also incorporated a ±4,900 linear foot multi use bicycle trail. Responsibilities also included the submission of a CT DEEP Flood Management Certification application. On-Call Hydraulic and Drainage Engineering Services, U.S. Route 1 Drainage Study Darien, CT Served as Technical Manager and Engineer for this on-call contract with the Connecticut Department of Transportation. This project focused on the flooding of the U.S. Route 1 area in Darien near Stony Brook. Responsibilities included an analysis of the existing U.S. Route 1 storm sewer network, the design of four alternates and the recommendation of a preferred alternate to alleviate flooding along the roadway and surrounding properties. The study report included an analysis of the history of development along the U.S. Route 1 corridor, utility impacts, required permits and a cost estimate for each alternate. Stormwater General Permit Support Services, Connecticut Department of Transportation Statewide, CT Serves as Design Professional for the independent review of all CTDOT projects requiring submission and approval of a CTDEEP General Permit for the Discharge of Stormwater and Dewatering Wastewaters Associated with Construction Activities application. This work includes the review of project information, contract plans and specifications including erosion control measures for conformance with the general permit and to the 2024 Stormwater Quality Manual. Sumner Brook Flood Study Middletown, CT Served as Principal Hydraulics Engineer for the flood study of the Sumner Brook Watershed in Middletown, CT. This project, funded by the City of Middletown, involved collecting flood data, field observations, and survey information to develop a 2-D unsteady flow model of the brook using Aquaveo’s SMS software and to recommend projects for the City to complete to eliminate areas of flooding. Responsibilities included the development of the hydrologic and hydraulic models and supporting report. Ash Creek Pedestrian Bridge Replacement Bridgeport, CT Served as Principal Hydraulics Engineer for the analysis of a new 225-foot-long single span steel truss pedestrian bridge over Ash Creek, from the existing Fairfield Metro Center to the Black Rock Neighborhood in the City of Bridgeport. New multi-use trails on both the Fairfield and Bridgeport sides will provide an alternative mode of transportation and are in sustainability goals by lessening reliance on automobile transit. Responsibilities include the preparation or oversight of hydraulic and scour reports, assisting the submission of an USACE Pre-Construction Notification Form and a CT DEEP Coastal permit application.
Page 109
BL Companies Matthew Stark Senior Project Manager/Director of Construction Inspection Services Summary of Qualifications Mr. Stark serves as the Director of Construction Engineering and Inspection Services at BL Companies, overseeing the financial and operational management of the group. He plays a key role in strategic hiring, market expansion, and advancing paperless construction in alignment with FHWA’s “Make Every Day Count” initiative. Committed to innovation, he integrates new technologies into field operations while providing oversight and support to inspection staff across Connecticut. Recognized for his expertise in materials selection, installation methodologies, quality assurance, and contract administration, he is a trusted resource among colleagues, peers, and project owners. In addition to his leadership role, Mr. Stark serves as a Chief Construction Inspector in the Transportation and Infrastructure Department when needed. With over 20 years of field experience, he specializes in construction inspections, contract compliance, and project coordination, particularly for CTDOT-administered projects. His expertise includes supervising construction work, ensuring specification adherence, managing progress payments, reviewing change orders, and overseeing final testing and approvals. He is instrumental in construction cost analysis, liaising between owners, contractors, and regulatory agencies to ensure seamless project execution. Relevant Experience White Street and Locust Avenue Intersection Improvements, Project No. L034-001 Danbury, CT Serves as Construction Coordinator of an intersection improvement project. This project includes relocation of existing utilities, drainage improvements, road widening, construction of new sidewalks, milling and paving of roadway, and installation of new traffic lights. Responsibilities included daily inspection of field activities and documenting in a daily written report, field measurements and quantity computations of accepted work, coordination of materials testing, maintaining inspection documentation to prepare payment estimates for the contractor, and quantity computation checks. HIGHLIGHTS YEARS IN THE INDUSTRY 20 EXPERTISE Construction Engineering and Inspection PROJECT ROLE Construction Inspection & Administration EDUCATION Associates Degree, General Studies, Manchester Community College, 2000 REGISTRATIONS NICET Level III Highway Construction Inspection #131582 NETTCP Concrete Inspector Certification #2104 NETTCP HMA Paving Inspector #3063 PROFESSIONAL MEMBERSHIPS OSHA 10-Hour Construction Program American Safety and Health Institute Adult CPR and AED
Page 110
BL Companies Matthew Stark Replacement of Bridge No. 04480 Louisiana Avenue over Coppermine Brook Bristol, CT Served as the Chief Construction Inspector for the replacement of the existing Louisiana Avenue Bridge over Coppermine Brook for the City of Bristol, CT. This project is funded in- part under the Federal Local Bridge Program (FLBP). The project is a full superstructure replacement built on micropiles. The new bridge is a 53-foot single-span with reinforced pre- stressed concrete deck units, supported by reinforced concrete abutments. In addition to the new bridge, approximately 400 feet of roadway will be reconstructed, new drainage structures shall be installed, along with other utility relocations to be performed within the project limits. Full-time construction inspection is being provided in accordance with the FLBP Guidelines and the CTDOT District-1 Office. Project documentation requirements followed both CONNDOT’s Municipal Manual and CONNDOT’s Construction Manual’s four-book system which requires strict material quality assurance and control testing. Arctic Street Bridge Replacement Bridgeport, CT Served as the lead Construction Inspector for the replacement of the existing Arctic Street Bridge over Yellow Mill Channel. The project involved over-spanning the existing substructure with new pile-supported foundations that accepted the proposed precast concrete three-sided frame bridge to preserve the arch aesthetic appearance while relocating the utilities underground and addressing roadside safety. Inspection services included daily observation of contractor’s activities, preparation of daily work reports, contractor and City coordination, utility coordination, material and laboratory testing, review of payment requisitions and change orders, as well as construction survey. Safe Routes to School, Sidewalk Extension Southington, CT Served as the Full-time Inspector for the construction inspection services for the Safe Routes to School, Sidewalk Extension project that is located from Crest Road to Woodruff Street in the Town of Southington. The improvements included two separate sidewalk extensions. In addition to the new sidewalk, the project involved the construction of an at grade wetlands crossing to be constructed of a reinforced concrete slab and the installation of traffic calming elements and a crosswalk. Farmington Canal Heritage Trail – Lazy Lane to Aircraft Road Project (State Project #131-203) Southington, CT Served in dual roles as Construction Coordinator and as Part-Time Chief Construction Inspector to provide on-site coordination, evaluation and inspection to remove existing railroad tracks and construct a multi-use trail of approximately 1.3 miles along the existing railroad corridor across the Town of Southington. Work included excavation, grading, paving, concrete sidewalks, concrete sidewalk ramps, decorative bituminous concrete crosswalks, repointed masonry of exiting historical Brownstone Bridge, under bridge luminaires, fences and metal beam rails, landscaping, improvements to bituminous concrete roadways at intersections, and removal and replacement of bituminous concrete curbing. Construction of this Southington segment is one of many trail segments along the FCHT under development for the trail system that will extend roughly 84 miles from New Haven, CT to Northampton, MA.
Page 111
BL Companies Sagan Simko CPSS, PWS Senior Project Scientist II Summary of Qualifications With nearly two decades of field and technical expertise, Mr. Simko excels in ecological assessment and regulatory compliance for complex environmental projects. Mr. Simko brings nearly 19 years of specialized experience in wetland delineation and site assessment within diverse environmental settings. His background includes conducting detailed soil morphological evaluations, infiltration and percolation testing, and designing and monitoring wetland mitigation projects. He has performed both Phase I and II Bog Turtle surveys and threatened and endangered species assessments. Mr. Simko also has expertise in carbonate geology site evaluations, asbestos-containing material identification, and underground storage tank (UST) removals and investigations. Proficient in ArcGIS 10 and Trimble software, he integrates geospatial analysis into his field and reporting work. As a Senior Project Scientist II at BL Companies, Mr. Simko is responsible for conducting wetland, soil, and groundwater investigations; managing Bog Turtle Phase I and II surveys; completing Phase I Environmental Site Assessments (ESAs); supporting remediation projects; monitoring remediation systems; and performing engineering and environmental compliance inspections. Relevant Experience Peer Review, 4-Lot Subdivision Inland Wetland Commission Stratford, CT Served as Lead Soil and Wetland Scientist in the performance of a peer review of a proposed 4-lot subdivision application submission to the Inland Wetland Commission of Stratford, CT. The peer review required a site visit to verify previous wetland delineations and assistance with the technical review of the submission. Upon completion of review, findings were presented in-person to the Stratford Inland Wetland Commission. HIGHLIGHTS YEARS IN THE INDUSTRY 19 EXPERTISE Wetland Delineation & Mitigation Endangered Species & Habitat Surveys PROJECT ROLE Environmental Resources & Permitting EDUCATION Bachelor of Science in Environmental Resource Management, The Pennsylvania State University, 2005 Master of Science in Biology, Bloomsburg University of Pennsylvania, 2015 REGISTRATIONS Certified Professional Soil Scientist (CPSS), 2012, #36359 Professional Wetland Scientist (PWS), 2012, #2284 Qualified Hydrologic Professional In-Training (QHP- IT), 2024
Page 112
BL Companies Sagan Simko CPSS, PWS Connecticut Department of Transportation State Project No. 108-189 – Moosup Valley State Park Trail Plainfield to Sterling, CT Served as Senior Project Scientist to investigate the presence or absence of vernal pools along the Moosup Valley State Park Trial. Vernal pools were identified utilizing available mapping, aerial photography and field investigation. Evidence of obligate amphibian species presence and breeding was noted in the field via inspection beyond visual and audial, including trapping and dip-netting. Metro North Milvon Substation – West River Substation Vernal Pool Assessment Milford to New Haven, CT Served as Senior Project Scientist to investigate the presence or absence of vernal pools along a portion of the commuter train route. Any vernal pool areas were noted and recorded with GPS coordinates to submeter accuracy. Vernal pools were identified utilizing available mapping, aerial photography and field investigation. Evidence of obligate amphibian species presence and breeding was noted in the field via visual and audial inspection. Avangrid – Wetland Delineations and Vernal Pool Investigation Within Metro North Railroad Corridor Westport to New Haven, CT Served as lead Soil and Wetland Scientist and Biologist in the performance of survey work for wetlands and vernal pool areas along the railroad corridor between Westport and New Haven, CT. Southeast Bristol Business Park - Lot 3, Lot 9, Lot 10 Bristol, CT Serving as Senior Project Scientist, conducted a wetland delineation survey for Lot 3, Lot 9, and Lot 10 of the Southeast Bristol Business Park in August of 2021. Following field delineation efforts, a wetland delineation report was created to give details regarding the field work findings. Additionally, a field site visit meeting with the City of Bristol’s Inland Wetlands and Watercourses Commission (IWWC) was performed to present wetland delineation findings to the Commission for their review and subsequent approval. Following the IWWC site meeting and agreement with the wetlands and watercourses delineation work, the City of Bristol’s official IWWC wetland mapping was updated from previous delineation work to reflect BL Companies’ more inclusive and comprehensive field findings and geographical positioning system (GPS) data collection. Consultant Liaison Engineering Services for the State and Federal Local Bridge Program, Connecticut Department of Transportation Statewide, CT Served as Senior Project Scientist for several bridge rehabilitation and replacement projects for CTDOT across the state. Responsibilities included performing wetland delineations, function and values assessments, and bat habitat assessments at each bridge location where natural resources were identified as being within the proximity of proposed work. Additional responsibilities included attaining environmental permitting for the CTDEEP and U.S. ACOE, identifying invasive species, and coordination for listed species.
Page 113
BL Companies Joy Kloss LEP, CHMM Senior Project Manager Summary of Qualifications Ms. Kloss is a Senior Project Manager at BL Companies with over 20 years of experience in environmental consulting, specializing in site investigations, remediation, regulatory compliance, and environmental permitting. Ms. Kloss has successfully managed complex environmental projects and has extensive experience preparing Phase I/II/ III Environmental Site Assessment (ESA) reports, Groundwater Compliance Reports, Remedial Action Plans, and various environmental permits. Her work also includes developing Stormwater Pollution Prevention Plans (SWPPP), Spill Prevention, Control, and Countermeasure (SPCC) Plans, and Health and Safety Plans (HASPs), ensuring compliance with environmental regulations at both state and federal levels. With a strong background in field operations, Ms. Kloss has supervised soil boring advancements, groundwater monitoring well installations, soil vapor point placements, and environmental sampling of soil, groundwater, stormwater, sediment, and air. She has also led underground storage tank closures, soil excavations, and emergency spill response efforts. As a Senior Project Manager at BL Companies, she is responsible for planning and executing environmental investigations and remediation, developing soil and groundwater management procedures, and ensuring regulatory compliance for a diverse range of projects. Her leadership and technical expertise contribute to the successful execution of environmentally responsible and regulatory-compliant solutions. Relevant Experience Stormwater Permitting Compliance Bristol, CT Served as Senior Project Manager providing compliance services for City of Bristol. Project responsibilities included preparation of annual reports in accordance with the General Permit for the Discharge of Stormwater from Small Municipal Separate Storm Sewer Systems. She also supported the city during an Environmental Protection Agency (EPA) Request for Information Pursuant to Section 308 of Clean Water Act by preparing the EPA response letter, providing outfall sampling consulting and HIGHLIGHTS YEARS IN THE INDUSTRY 20 EXPERTISE Environmental Investigations Management Environmental Site Investigation Reports Project Management PROJECT ROLE Environmental Services EDUCATION Bachelor of Science, Environmental Science, Hobart and William Smith Colleges, 2001 REGISTRATIONS Licensed Environmental Professional: Connecticut No. 589 Certified Hazardous Materials Manager (CHMM), 2013, No. 16360 PROFESSIONAL MEMBERSHIPS Environmental Professionals Organization of Connecticut
Page 114
BL Companies Joy Kloss LEP, CHMM training, developing a stormwater sampling plan, and providing general MS4 support. Harbor Brook Flood Control, Utility Bridge & Linear Trail Project, Hanover Pond to Baldwin Meriden, CT Served as Environmental Project Manager to assess project activities in relation to environmental conditions within the project limits and for the completion of Task 310 – Plans, Specifications, and Estimates for incorporation into the project contract bid documents. Plans were prepared to identify soil, sediment, and groundwater AOECs and Waste Stockpile Areas (WSAs) within the project limits, based on previously Task 210 – Subsurface Site Investigations. Ms. Kloss was in charge of the development of specifications for the proper handling and disposal of soil, sediment, and groundwater, WSA construction, solidification, as well as health and safety. In addition, an estimate was prepared for all environmental compliance items. Fox Street Streetscape Improvements. Pedestrian Bridge Over Ash Creek & Multi-Use Trail Along Ash Creek Bridgeport, CT Served as Environmental Project Manager to assess project activities in relation to environmental conditions within the project limits and environmental engineered control on the adjacent Fairfield Metro Center property. After review of previous site investigations, Task 310 – Plans, Specifications, and Estimates were completed for incorporation into the project contract bid documents. Plans were prepared to identify soil, sediment, hazardous, and groundwater AOECs and Waste Stockpile Areas (WSAs) within the project limits. Specifications were developed for health and safety, proper handling, management, and disposal of controlled materials, WSA construction, solidification, and engineered control liner modifications. In addition, an estimate was prepared for all environmental compliance items. Helene Grant Head Start School New Haven, CT Served as Senior Environmental Scientist providing environmental consulting services in support of the complete demolition and reconstruction of the school. Project responsibilities included completion of Phase I and Combined Phase II & III ESAs and a hazardous building material survey and preparation of a Remedial Action Plan, PCB Building Materials Abatement Plan, and contract plans and specifications pertaining to site remediation (contaminated soil / fill material), abatement of hazardous building materials, and sub-slab radon mitigation system. Connecticut River Access, Multipurpose Trail, Main Street and South River Street Enfield, CT Served as Environmental Project Manager for the completion of a Task 210 – Subsurface Site Investigation associated with a proposed trail on behalf of the Town of Enfield. The project consisted of the construction of a multipurpose path and associated landscaping. The project included the construction of a precast concrete pedestrian bridge crossing Freshwater Brook that will provide access to the existing Asnuntuck Road underpass at the Amtrak right-of-way (ROW). Asnuntuck Road will be closed to vehicular traffic to accommodate bicycle and pedestrian traffic through the railroad underpass. The multipurpose path will proceed northward along South River Street and then turn westerly along Main Street to a viewing point on the east shoreline of the Connecticut River. The Task 210 included the advancement of three soil borings using a Geoprobe direct push rig, advancement of eight soil borings using a hand auger, and laboratory analysis of eleven soil samples. Based on the data, preliminary AOECs were identified. An archeological study was planned within the AOEC; therefore, Ms. Kloss reviewed their HASP for compliance with applicable regulations prior to intrusive activities.
Page 115
BL Companies Christopher Critelli PE Project Manager II Summary of Qualifications Chris leverages 13 years of industry experience to enhance operational processes and analyze renewable energy technologies. At BL Companies, he expertly manages Energy Projects, focusing on renewable natural gas and energy efficiency designs for clients. With 13 years of dedicated experience in the renewable energy, wastewater, and construction industries, Chris brings a wealth of expertise to BL Companies. His specialization lies in optimizing operational processes, precisely sizing equipment, and serving as a technical lead for in-depth technology analysis. As a Project Manager II, Chris is instrumental in delivering insightful oversight for Energy Projects, developing innovative designs for renewable natural gas and driving energy efficiency solutions for our clients. Relevant Experience Elmwood Pump Station Cheshire, CT Lead Engineer designing upgrades at a municipal pump station, including a new aeration mixing system, variable frequency drives for pumps, channel grinders, a bypass system, and upgraded controls. Clinton and Wrentham Wastewater Treatment Plants – Operational Monitoring Clinton, CT and Wrentham, MA Performed operational monitoring at two wastewater treatment facilities encountering performance issues. Chris conducted site visits, identified equipment and process deficiencies, analyzed plant data to identify pinch points, designed upgrades, and continued monitoring facility operations to ensure compliance. Port Chester Wastewater Treatment Plant – Primary Settling Tank Rehabilitation and Outfall Chamber Redesign Port Chester, NY Project Manager improving the primary settling tanks, outfall chamber, and disinfection system. Chris developed an immediate flow redirection solution following a major pipe failure, calculated effluent pipe sizing, coordinated on support design, HIGHLIGHTS YEARS IN THE INDUSTRY 13 EXPERTISE Renewable Energy Wastewater PROJECT ROLE Sewer Engineering EDUCATION Bachelor of Science in Chemical Engineering, Manhattan College, 2012 Master of Science in Chemical Engineering, Manhattan College, 2013 REGISTRATIONS Professional Engineer: CT (2023), WI (2025) PROFESSIONAL MEMBERSHIPS New York Water Environmental Association
Page 116
BL Companies Christopher Critelli PE redesigned the outfall chamber, and designed chemical feed pumps and hypochlorite dosing. Hunts Point Wastewater Treatment Plant – Membrane Gas Holder Design and Anaerobic Digestion Study Hunts Point, NY Project Manager and Lead Engineer designing a membrane gas holder and ancillary equipment to store excess digester gas. Chris analyzed facility energy consumption and calculated gas production for existing mesophilic digesters and planned thermophilic digesters. He developed the local and remote control system and integrated it into the existing SCADA system. Bedford Hills Wastewater Treatment Plant – Preliminary and Secondary Treatment Design Bedford, NY Multi-disciplinary Project Manager responsible for upgrading the facility’s entire treatment process. Chris led primary system rehabilitation and biological nutrient removal improvements, created a hydraulic profile, sized equalization tanks, designed sludge and scum collector systems, microscreens, vortex grit chambers, channel grinders, and grit collection systems. He performed secondary treatment feasibility analysis and selected a Rotating Biological Contactor. He also developed local and remote controls for all equipment. Mamaroneck Wastewater Treatment Plant – Biological Nutrient Removal and Aeration Blowers Study Mamaroneck, NY Designed upgrades to improve BNR performance. Chris designed new aeration blowers, piping, and controls; optimized blower system operation; and developed alternatives for blower size, flow patterns, and aeration diffuser grid layout based on loading scenarios. Wards Island Wastewater Treatment Plant – Primary and Secondary Treatment Improvements and Operational Analysis Wards Island, NY Project Engineer providing operational monitoring and developing design alternatives to improve primary and secondary treatment processes and meet Ten State Standards. Chris evaluated flow rates, suspended solids removal, thickener performance, digester conditions, surface overflow rates, and detention time. He developed Excel models for electrical, fuel oil, and chemical use, biosolids removal, greenhouse gas emissions, and prepared sustainability and waste generation reports. Great Neck and Belgrave Wastewater Treatment Plants – Operational Monitoring Long Island, NY Project Engineer performing statistical analysis of flow, BOD, nitrogen, solids, and contaminant concentrations. Conducted site walkthroughs to observe operations, inspect equipment, resolve baseline data issues, and identify areas for process improvement. Peekskill Wastewater Treatment Plant – Aeration and Heating Upgrades Peekskill, NY Assistant Project Manager and Lead Engineer evaluating blower and aeration systems and upgrading the heating system. Chris increased blower discharge and suction piping, replaced silencers, modified controls, designed a temporary blower system, sized new air lines, specified valves, identified structural improvements, and sized fuel oil tanks for emergency boiler loads.
Page 117
BL Companies Jesse E. Vose PE Senior Project Manager Summary of Qualifications Jesse brings over 26 years of expertise in the design, analysis, and specification of mechanical systems across a diverse range of sectors, including healthcare, education, commercial, cultural, residential, retail, and industrial projects. As a Senior Project Manager at BL Companies, he leads multidisciplinary engineering teams in mechanical, electrical, plumbing, and fire protection to ensure projects meet or exceed client expectations and deadlines. Committed to seamless project execution, Jesse emphasizes collaboration and coordination among architects, clients, building owners, end users, consultants, contractors, and regulatory officials. His leadership and strategic approach drive efficient, high-quality designs that align with project goals and industry standards. Relevant Experience Scofield Magnet Middle School Stamford, CT MEP project manager for a $2.5 million packaged rooftop air-handling unit and building management system (BMS) replacement project at a 142,000 square foot middle school. Design services were completed in 2025. Turn of River Middle School Stamford, CT MEP project manager for a $1.3 million boiler and domestic hot water heater replacement project consisting of a completely new boiler plant with condensing boilers at a 125,000 square foot middle school. Design services were completed in 2023. Stamford Board of Education Stamford, CT MEP project manager for building management system (BMS) and security system upgrades at 18 schools and Board of Education facilities. Scope of work included connecting numerous pieces of MEP equipment and various sensors to both the BMS and security systems, in order to issue remote alarms upon detection of potential problems. Design services were completed in 2023. HIGHLIGHTS YEARS IN THE INDUSTRY 26 EXPERTISE Mechanical Engineering Project Management PROJECT ROLE Mechanical Engineering EDUCATION Bachelor of Science in Mechanical Engineering, Rensselaer Polytechnic Institute REGISTRATIONS Professional Engineer: CA, CO, CT, FL, IL, IN, MA, MI, MN, NH, NY, NC, OH, OR, PA, RI, WA PROFESSIONAL MEMBERSHIPS American Society of Heating, Refrigerating, and Air- Conditioning Engineers
Page 118
BL Companies Jesse E. Vose PE Stamford Courthouse Stamford, CT Served as MEP Project Manager and Engineer of Record for a study and investigation, followed by a $3.6 million design to replace the 800-ton chilled water plant at the 8-story Stamford Courthouse complex. The assessment portion of this project involved a comparison of chiller options to replace the existing air-cooled chillers with remote evaporators. The design portion included new air-cooled chillers, pumps, heat exchangers, hydronic components, piping, and controls. Design services were completed in 2025. Polson Middle School Madison, CT Overall project manager, MEP project manager, and Engineer of Record for a $27 million renovation of a 152,000 square foot middle school. Mechanical, electrical, plumbing, fire protection, architectural, and structural design services associated with new HVAC systems, electrical power upgrades, and an auditorium renovation. New systems included rooftop air-handling units, packaged dedicated outside air systems (DOAS), variable refrigerant flow (VRF) systems, building management system (BMS) upgrades throughout the facility, structural modifications to support mechanical equipment, electrical service, full building generator and related equipment, lighting, and ceilings. Along with the new electrical service, the school’s electrical distribution system was upgraded with new switchgear and panels. The auditorium renovation included new seating, theatrical and general lighting, audio visual systems, flooring, and HVAC. Design services were completed in 2025. Fairfield Woods Middle School Fairfield, CT Overall project manager, MEP project manager, and Engineer of Record for a $16.1 million renovation of a 177,000 square foot middle school. Mechanical, electrical, plumbing, fire protection, architectural, structural, and civil design services associated with new HVAC systems to serve 80,000 square feet of the school. New systems included packaged rooftop air-handling units, packaged dedicated outside air systems (DOAS), variable refrigerant flow (VRF) systems, building management system (BMS) upgrades throughout the facility, structural modifications to support mechanical equipment, electrical service, lighting, ceilings, and security vestibules. Design services were completed in 2025. Tomlinson Middle School Fairfield, CT Overall project manager, MEP project manager, and Engineer of Record for a $4.7 million renovation of a 167,000 square foot middle school. Mechanical, electrical, plumbing, fire protection, architectural, and structural design services associated with new HVAC systems to serve 17,000 square feet of the school. New systems included packaged rooftop air-handling units, building management system (BMS) upgrades, lighting, ceilings, and structural modifications to support mechanical equipment. Design services were completed in 2025. Firm of Record: BL Companies.
Page 119
BL Companies Dennis Burton PE, PMP Principal Engineer Summary of Qualifications Dennis Burton brings over 25 years of distinguished experience in architectural design and engineering, shaping the built environment with his expertise. His extensive portfolio spans a diverse range of projects, including high-rise buildings, sports venues, cultural institutions, commercial developments, luxury residences, hotels, educational facilities (K-12 and higher education), laboratories, and large- scale master planning across the United States, Europe, the Caribbean, and Asia. As a Principal Engineer at BL Companies, Mr. Burton plays a pivotal role in overseeing electrical power, lighting, and fire alarm system design, while also providing critical support to HVAC and P/FP engineering teams. His responsibilities extend to proposal and specification writing, client interviews, construction administration, and the leadership of engineering teams, ensuring the highest standards of innovation, efficiency, and technical excellence.. Relevant Experience New Louis Armstrong Tennis Stadium USTA Queens, NY Served as MEP Project Manager and Lead Electrical Engineer for MEP/FP and Sports Lighting Design for the new 14,000-seat tennis stadium at the USTA Billie Jean King National Tennis Center, one of the venues of the US Open. Project marked the first design of a naturally ventilated closed roof stadium. Mr. Burton was active on site in preconstruction meetings and throughout construction. Mr. Burton also designed the electrical systems for the temporary stadium, which facilitated the 2017 US Open season and facilitated numerous owners requested change for retail and technical power up to opening day. Florida Atlantic University Football Stadium Sports Lighting Boca Raton, FL Served as Project Manager and Lead Electrical Engineer for lighting replacement to HD quality for the 29,000-seat stadium. Design included baseline photometrics, design and bid leveling with client. Design services were completed in 2018. HIGHLIGHTS YEARS IN THE INDUSTRY 25 EXPERTISE Electrical Engineering Project Management PROJECT ROLE Electrical Engineering EDUCATION Bachelor of Science in Electrical Engineering, University of South Florida Master of Business Administration, Lynn University REGISTRATIONS Professional Engineer: AL, AZ, AR, CA, CT, DC, FL, HI, KS, MD, MA, MI, MO, NE, NJ, NM, NY, NC, ND, OR, RI, SC, UT, WA PROFESSIONAL MEMBERSHIPS Project Management Professional (PMP) Certificaiton
Page 120
BL Companies Dennis Burton PE, PMP Fairfield Woods Middle School Fairfield, CT Served as Electrical Engineer for a $7.3 million renovation of a 177,000 square foot middle school. Mechanical design services associated with new HVAC systems to serve 80,000 square feet of the school. New systems included packaged rooftop air-handling units, packaged dedicated outside air systems (DOAS), variable refrigerant flow (VRF) systems, building management system (BMS) upgrades throughout the facility, structural modifications to support mechanical equipment, new electrical service, new lighting, and new ceilings. Osborn Hill Elementary School Fairfield, CT Served as Electrical Engineer for a $6.0 million renovation of a 55,000 square foot elementary school. Mechanical design services associated with new HVAC systems to serve 32,000 square feet of the school. Daniel Hand High School Theatre Lighting Madison, CT Served as the MEP Manager for the Daniel Hand High School Theatrical Lighting System Upgrade project, delivering a modern, energy-efficient lighting system that met the program’s needs and the allocated budget. The project involved complete replacement of the existing conventional lighting system, which needed modernization, to support the school’s theatrical programs. BL Companies designed a digital DMX LED moving color mixing spotlight system. The new system includes a network lighting control console, updated emergency controls, Fire Alarm interface and structural support assessments and features such as specialized Gobos. Polson Middle School Madison, CT Served as Electrical Engineer for a $27 million renovation of a 152,000 square foot middle school. Mechanical, electrical, plumbing, fire protection, architectural, and structural design services associated with new HVAC systems, electrical power upgrades, and an auditorium renovation. New systems included rooftop air-handling units, packaged dedicated outside air systems (DOAS), variable refrigerant flow (VRF) systems, building management system (BMS) upgrades throughout the facility, structural modifications to support mechanical equipment, electrical service, full building generator and related equipment, lighting, and ceilings. Along with the new electrical service, the school’s electrical distribution system was upgraded with new switchgear and panels. The auditorium renovation included new seating, theatrical and general lighting, audio visual systems, flooring, and HVAC. Rhode Island Public Transit Authority, Pawtucket-Central Fall Passenger Facility Pawtucket, RI Serving as Electrical Engineer for the design of a 5,000 SF passenger facility for the Pawtucket- Central Falls transit center. The facility will contain waiting, ticketing, restrooms, and services for drivers. Responsibilities include development of the program, conceptual design, public outreach, and coordination of disciplines. In addition, responsibilities will include oversight of the completion of the construction documents and construction administration. University of Rhode Island – Green Hall and Quad Lighting Upgrades Kingston, RI Serves as Principal Electrical Engineer and Engineer-of-Record for the design of exterior lighting improvements around the area south of Green Hall and the area around the Quadrangle, Ranger Hall and Quinn Hall.
Page 121
SECTION IV Project Understanding
Page 122
BL Companies Project Understanding and Approach BL Companies understands that the Town of Granby is seeking a responsive, experienced engineering partner capable of delivering both specific capital improvement projects and a broad range of on-call municipal engineering services over the next five years. Through our successful relationships with municipalities throughout Connecticut, we have developed a proven project delivery approach centered on responsiveness, technical excellence, proactive communication, and flexibility which is a function of our employee owner culture. Our objective is to serve as an extension of Town staff, providing reliable expertise and scalable resources that can quickly adapt to the Town’s evolving needs. A defining strength of BL Companies is our ability to provide nearly all required services in- house. Our multidisciplinary team includes licensed engineers, landscape architects, surveyors, environmental scientists, architects, planners, construction professionals, and permitting specialists who routinely collaborate on municipal infrastructure projects. This integrated structure eliminates unnecessary handoffs, improves communication, enhances quality control, and allows projects to move efficiently from planning through design and into construction. Program Management and Project Delivery Overall administration and management of this contract will be led by Joshua Wheeler, PLA, who will serve as the Town’s primary point of contact. Josh has extensive experience managing municipal capital improvement projects including roadway and pedestrian enhancements, trails, parks, athletic facilities, streetscapes, and community development initiatives. As Program Manager, he will coordinate all task orders, oversee project schedules and budgets, facilitate communication among stakeholders, and ensure that each assignment receives the appropriate technical resources. Josh’s experience with municipal, state, and federally funded projects provides him with a strong understanding of project development requirements, permitting processes, funding compliance, and stakeholder coordination. His role will be to ensure seamless project delivery while maintaining responsiveness, accountability, and consistency throughout the duration of the contract. For each assignment, BL Companies will implement a task-based delivery model that establishes a clear scope, schedule, budget, and communication framework. Upon receipt of a Town request, our team will: • Meet with Town staff to define project goals and objectives. • Review available data and identify project constraints and opportunities. • Develop a detailed scope of services, schedule, and fee proposal. • Assign a discipline specific project manager and supporting technical team. • Maintain ongoing communication and progress reporting throughout execution. Our goal is to provide the Town with a single point of accountability while leveraging the expertise of our full multidisciplinary team.
Page 123
BL Companies SURVEYING AND MAPPING Surveying and mapping services will be led by Don Smith, PLS, who brings more than 29 years of experience managing survey operations throughout Connecticut. Don and his team support roadway, trail, bridge, utility, and municipal infrastructure projects by providing accurate existing conditions data and mapping necessary for project development. Representative experience includes: • Bloomfield Greenway Multi-Use Trail • Silas Deane Streetscape Project, Rocky Hill • Harbor Brook Channel Improvements and Multi-Use Trail, Meriden Our survey team routinely prepares topographic surveys, boundary surveys, easement maps, land acquisition maps, and ROW plans in accordance with Connecticut standards and CTDOT requirements while utilizing the newest technology, equipment and computer software. A few of our specialties include: • High Definition 3D Laser Scanning • Unmanned Aerial Vehicle (UAV) Mapping • Subsurface Utility Engineering (SUE) TRANSPORTATION AND ROADWAY DESIGN Roadway and multimodal transportation design services will be led by Steven Fraysier, PE, who brings significant experience in municipal and CTDOT transportation projects throughout Connecticut. Steven’s experience includes roadway improvements, sidewalks, trails, multimodal corridors, pedestrian enhancements, bridge-related transportation projects, and Complete Streets initiatives. Relevant projects include: • Beeline Trail (State Project No. 88-198) • South Street Roadway & Pedestrian Improvements • Hopmeadow Pedestrian Improvements • Stratfield Pedestrian Improvements Steven will draw upon his extensive experience with municipal and CTDOT-funded projects to guide roadway and multimodal assignments. Throughout his career, he has worked on projects funded through LOTCIP, Community Connectivity, Urban Act, RAISE, and State Local Bridge programs, among others, providing a thorough understanding of project development requirements, funding compliance, and applicable design standards.
Page 124
BL Companies Our approach incorporates Complete Streets principles that safely accommodate pedestrians, bicyclists, motorists, transit users, and people of all abilities while respecting environmental, community, and right-of-way constraints. Representative pedestrian and corridor projects include South Street in Coventry and Bradley Road in Madison, where BL Companies successfully integrated roadway reconstruction, pedestrian facilities, stakeholder coordination, and public outreach to create safer community connections. STRUCTURAL ENGINEERING AND BRIDGES Bridge engineering services will be led by Brian Reilly, PE, who leads BL Companies’ municipally focused bridge design team. Their team has completed bridge and culvert rehabilitation, preservation, and replacement projects in more than twenty Connecticut communities and routinely provides: • Bridge inspections and condition assessments • Structure type studies • Rehabilitation and replacement design • Hydraulic coordination • Utility coordination • Rights-of-way support • Construction administration and inspection Our bridge team emphasizes practical, cost-effective, and constructible solutions while maintaining sensitivity to community context, environmental resources, and historic character. Their experience includes projects funded through municipal, state, and federal transportation programs, ensuring familiarity with all phases of project delivery. HYDRAULICS, DRAINAGE, AND PERMITTING Hydraulic, drainage, and permitting services will be led by David Cicia, PE, a Principal Engineer with more than 26 years of experience in hydrologic and hydraulic engineering. David has extensive experience with: • Stormwater management • Floodplain analysis • FEMA mapping • Stream and culvert design • Scour evaluations
Page 125
BL Companies • Storm sewer systems • Environmental permitting Recent projects include: • Marion Avenue Bridge Replacement, Southington • Pepper Street Culvert Replacement, Monroe As a certified CTDOT Hydraulics and Drainage Engineer, David brings extensive experience coordinating with CTDEEP, ACOE, municipal inland wetlands agencies, and other permitting authorities. Our team initiates environmental permitting efforts early in project development to identify requirements, reduce risk, and maintain project schedules. CIVIL ENGINEERING Civil engineering services will be led by Robert Roles, PE, who has over 30 years of experience providing municipal engineering solutions throughout Connecticut. Robert’s expertise includes: • Site development • Utility coordination • Stormwater management • Roadway design • Hydraulic analysis • Pump station design • Sanitary sewer design • Environmental permitting His broad project experience enables BL Companies to provide practical and sustainable solutions for municipal infrastructure, site improvements, recreational facilities, and utility projects. TRAFFIC ENGINEERING Traffic engineering services will be led by Michael Dion, PE, PTOE, RSP1 and Michael Shepley, PE, PTOE, who collectively possess more than 35 years of traffic engineering experience. Their services include: • Traffic signal design • Traffic studies
Page 126
BL Companies • ADA and PROWAG • Signing / pavement marking • RRFB design • Pedestrian crossings • Traffic management plans • Transportation permitting As leaders of BL Companies’ CTDOT Traffic and Safety CLE contract, they maintain strong relationships with CTDOT staff and routinely coordinate transportation projects throughout Connecticut. ENVIRONMENTAL SERVICES Environmental services will be led by Joy Kloss, LEP, CHMM, supported by Scott Johnson, who leads BL Companies’ Hazardous Building Materials Assessment Team. Joy brings more than 20 years of environmental consulting experience and specializes in: • Phase I, II, and III Environmental Site Assessments • Remediation planning • Environmental permitting • Groundwater compliance • SWPPP development • Regulatory coordination Scott brings more than 21 years of experience involving: • Hazardous building materials investigations • Asbestos and lead assessments • Abatement design • Demolition planning • Regulatory compliance Together, they provide comprehensive environmental services that support project feasibility, permitting, redevelopment opportunities, and regulatory compliance. FACILITY DESIGN AND MEP ENGINEERING Facility design services will be led by Christen Robbins, AIA LEED AP and Christopher Albino, PE, whom have more than 52 years combined of architectural and structural engineering experience. BL Companies offers fully integrated:
Page 127
BL Companies • Architectural services • Structural engineering • Mechanical engineering • Electrical engineering • Plumbing engineering Representative projects include: • Connecticut Service Plazas • Enfield Town Garage Truck Wash Facility • Municipal facility improvements • Building additions and rehabilitations Our facility team focuses on developing durable, energy-efficient, maintainable solutions that align with the Town’s operational and budgetary goals. LANDSCAPE ARCHITECTURE Landscape architecture services will be led by Dominick Celtruda, PLA, ASLA. Dominick specializes in creating functional, attractive public spaces that enhance both user experience and community identity. His project experience includes park improvements, streetscapes, trails, and pedestrian-oriented environments throughout Connecticut. Our landscape architecture team evaluates: • Site aesthetics • Pedestrian circulation • Accessibility • Wayfinding • Planting design • Site furnishings • Lighting • Gathering spaces Whenever possible, we incorporate sustainable and native landscape solutions that reduce maintenance requirements and provide year-round visual interest. PUBLIC ENGAGEMENT AND STAKEHOLDER COORDINATION Meaningful public engagement is critical to successful municipal project delivery. Under the leadership of Joshua Wheeler, PLA, BL Companies develops project-specific outreach strategies that encourage participation while maintaining project momentum.
Page 128
BL Companies Our public engagement efforts typically include: • Stakeholder meetings • Public information sessions • Public workshops • Board and commission presentations • Agency coordination meetings • Documentation of comments and action items Our team understands how to balance public feedback, technical requirements, regulatory constraints, and project budgets to help build consensus and support project success. CONSTRUCTION ADMINISTRATION AND OBSERVATION BL Companies provides comprehensive construction administration and inspection services through its experienced construction engineering and inspection group. These efforts will be led by Matthew Stark, NICET III, Senior Construction Inspector, with support from Peter Schirmer, PE. Together they provide: • Resident engineering • Construction observation • Documentation and reports • Contractor coordination • Shop drawing review • Change order evaluation • Project closeout services Their experience spans both municipal and CTDOT-funded transportation and infrastructure projects and includes familiarity with the documentation requirements associated with local, state, and federal funding programs. OPINIONS OF PROBABLE CONSTRUCTION COST Accurate project budgeting is essential to successful delivery. BL Companies develops Opinions of Probable Construction Cost beginning in conceptual design and refines them through final design. Our estimates utilize: • CTDOT historical bid data • Recent municipal bid results • Current market conditions • Detailed quantity takeoffs
Page 129
BL Companies Every estimate undergoes internal QA/QC review to verify quantities, unit prices, and assumptions, providing the Town with reliable information for budgeting, grant applications, and capital planning. SITE INVESTIGATIONS AND TECHNICAL STUDIES BL Companies routinely performs site investigations and technical assessments that form the foundation for cost effective solutions to municipal projects. These services include: • Utility investigations • Geotechnical coordination • Environmental assessments • Structural evaluations • Wetland investigations • Surveying and mapping • Existing conditions documentation Our multidisciplinary approach allows findings to be integrated into a single, comprehensive report that supports planning, funding, design, and implementation decisions. PEER REVIEW AND QUALITY ASSURANCE Quality control is embedded throughout BL Companies’ project delivery process. In addition to providing peer review services for municipalities, COGs, and transportation programs throughout Connecticut, we maintain a rigorous internal QA/QC program. Our three-tier review process includes: • Independent discipline peer review • Engineer-in-Charge review • Executive Quality & Risk Review by Michael Fisher, PE This process ensures technical accuracy, interdisciplinary coordination, constructability, and compliance with project requirements before deliverables are submitted. Project Development Approach for On-Call Capital and Municipal Projects BL Companies will apply a consistent, scalable project delivery methodology across the full range of services contemplated under this contract, including transportation improvements, parks and recreation facilities, utility infrastructure, site development, drainage improvements, facilities, and other municipal capital projects. Our approach is designed to provide the Town with responsive service, clear communication, and efficient project execution from initial project conception through construction completion. Each assignment begins with a collaborative kickoff meeting involving Town staff and key stakeholders. Through early coordination, our team develops a thorough understanding of project
Page 130
BL Companies goals, funding requirements, schedule expectations, operational needs, and potential constraints. This upfront planning effort allows us to establish a clear path forward and identify opportunities and challenges before significant design resources are committed. During the Project Initiation phase, BL Companies will respond promptly to the Town’s request, conduct site visits and data collection efforts, and work closely with Town staff to define project scope, priorities, and success criteria. As part of this effort, our team evaluates existing site conditions, utility impacts, environmental constraints, rights-of-way considerations, permitting requirements, constructability concerns, schedule drivers, and any funding program requirements that may influence project development. Following project initiation, we move into Evaluation and Concept Development, where feasibility assessments and alternatives analyses are performed to identify practical and cost-effective solutions. Throughout this phase, we coordinate with Town stakeholders, agencies, utilities, and regulatory authorities as necessary while developing preliminary concepts and opinions of probable construction cost. This early evaluation process allows potential risks to be identified and addressed proactively, minimizing redesign efforts and helping maintain project schedules and budgets. Once a preferred alternative is selected, the project advances into Final Design and Permitting. During this stage, our multidisciplinary team prepares construction drawings, technical specifications, and supporting documents necessary for project implementation. We coordinate closely with utilities, property owners, regulatory agencies, and other stakeholders while obtaining any required permits and approvals. Continuous communication ensures that design decisions remain aligned with Town goals and stakeholder expectations. The final phase involves Bidding, Construction Administration, and Project Closeout. BL Companies supports the Town throughout the bidding process, including responding to contractor questions, reviewing bids, and assisting with contractor selection. During construction, we provide shop drawing review, construction observation, field inspections, and coordination with contractors to ensure the project is built in accordance with the design intent. Upon completion, we assist with project closeout activities, documentation, and final acceptance. Throughout every phase of project development, communication remains a cornerstone of our approach. Regular coordination with Town staff, regulatory agencies, stakeholders, and affected property owners allows projects to remain aligned with the Town’s objectives while providing the flexibility necessary to address unforeseen challenges and changing priorities. By combining proactive planning, technical expertise, and collaborative project management, BL Companies consistently delivers successful municipal projects that meet schedule, budget, and quality expectations. Athletic Track and Field Improvements BL Companies has extensive experience planning, designing, and overseeing athletic facility improvements for municipalities and educational institutions throughout Connecticut. Our approach focuses on understanding how facilities will function for athletes, coaches, spectators, maintenance personnel, and the community.
Page 131
BL Companies For athletic facility projects, we evaluate: • Site functionality and circulation • Access and parking requirements • ADA accessibility • Grading / stormwater management • Utility infrastructure • Athletic governing body requirements • Spectator amenities and safety considerations • Long-term maintenance requirements Approach to Anticipated Town Projects BL Companies understands that the Town’s anticipated projects represent diverse infrastructure, recreational, and utility needs that require multidisciplinary expertise and thoughtful project execution. Our team has successfully delivered similar projects throughout Connecticut and is well-positioned to provide planning, design, permitting, bidding, and construction administration services tailored to the Town’s goals and budget. Salmon Brook Park – Bathroom and Pickleball Court Improvements BL Companies recognizes that recreational facilities must balance functionality, accessibility, durability, maintenance requirements, and user experience. Drawing upon our extensive experience with park improvements, athletic facilities, trails, and public spaces, our team will work closely with the Town to evaluate existing conditions, identify the optimal location and configuration of proposed amenities, and develop improvements that complement the character of Salmon Brook Park. For the proposed restroom facility, our team will evaluate site access, utility availability, operational requirements, maintenance considerations, and long-term durability. Our in-house civil, structural, architectural, landscape architecture, and MEP professionals will collaborate to develop a facility that is attractive, functional, ADA-compliant, energy-efficient, and easy to maintain. Utility investigations will confirm available water, sewer, electrical, and communication services, while our site design team will address grading, drainage, pedestrian circulation, and emergency access requirements. For the pickleball courts, our team will evaluate site topography, existing drainage patterns, solar orientation, accessibility requirements, parking and pedestrian connections, court layout, fencing, lighting, stormwater management, and spectator accommodations. We understand the importance of proper grading and drainage in maintaining court performance and minimizing long- term maintenance costs. Our landscape architects will also evaluate opportunities for buffering, seating areas, shade structures, wayfinding, and aesthetic enhancements that improve the overall user experience. Throughout project development, BL Companies will coordinate with Town staff, user groups, and
Page 132
BL Companies stakeholders to ensure the final design reflects the community’s recreational goals while providing a sustainable and cost-effective long-term facility. Sewer Pump Maintenance and Rehabilitation Projects BL Companies has extensive experience providing condition assessments, rehabilitation design, asset management planning, and construction administration services for municipal utility infrastructure. These services will be supported by our utility and facility engineering professionals, including personnel experienced in pump station evaluations, mechanical systems, structural assessments, electrical upgrades, and regulatory compliance. Our approach begins with a comprehensive evaluation of the existing facility, including pumps, controls, motors, electrical systems, telemetry equipment, emergency backup systems, wet wells, force mains, valve structures, and associated site infrastructure. Through field investigations and coordination with Town operational staff, we will identify maintenance concerns, operational deficiencies, capacity limitations, equipment nearing the end of its useful life, and opportunities for improving system reliability. Following the assessment phase, our team will develop recommendations that balance operational needs, available funding, risk management, and long-term asset preservation. Potential improvements may include equipment replacement, control system upgrades, emergency power improvements, structural repairs, site drainage enhancements, security upgrades, and resiliency measures designed to improve performance during severe weather events and power outages. During implementation, BL Companies will prepare construction documents, assist with permitting and procurement, provide bidding support, and perform construction administration services to ensure improvements are completed in accordance with project objectives. Our goal is to help the Town maximize the service life of its utility assets while maintaining regulatory compliance, minimizing operational disruptions, and reducing long-term maintenance costs. General Municipal Engineering Tasks BL Companies routinely serves as an extension of municipal staff by providing responsive engineering support across a broad spectrum of public infrastructure projects. Through numerous on-call contracts throughout Connecticut, we have assisted municipalities with everything from small technical studies and emergency evaluations to complex, grant-funded capital improvement projects. Our team can quickly mobilize to support roadway improvements, sidewalk and trail projects, drainage investigations, bridge and culvert evaluations, traffic studies, site development projects, utility infrastructure improvements, facility upgrades, environmental permitting, grant applications, capital planning efforts, and peer reviews. Because we maintain comprehensive in- house capabilities, we are able to efficiently assemble the appropriate team for each assignment without requiring multiple outside consultants. For transportation-related projects, our engineers can provide corridor studies, roadway rehabilitation design, Complete Streets improvements, ADA and PROWAG compliance evaluations, traffic analysis, pedestrian enhancements, and grant-supported transportation improvements.
Page 133
BL Companies For drainage and utility projects, our team can investigate flooding concerns, evaluate aging infrastructure, perform hydraulic analyses, develop stormwater management solutions, and prepare permitting documents. For parks, schools, and municipal facilities, we provide planning, site design, architectural and engineering services, cost estimating, public outreach, and construction support. Additionally, our environmental professionals can support site investigations, wetland evaluations, hazardous building materials assessments, permitting efforts, and regulatory coordination. Regardless of project size or complexity, BL Companies employs the same disciplined approach of early coordination, thorough investigation, stakeholder engagement, proactive risk management, and strong quality control. This allows us to provide practical, cost-effective solutions that help the Town advance its capital improvement goals while maximizing available funding and maintaining project schedules. Commitment to the Town of Granby BL Companies’ combination of experienced leadership, deep technical expertise, municipal project experience, and comprehensive in-house capabilities uniquely positions us to serve as the Town of Granby’s trusted engineering partner. Whether supporting a single task order or a multi-year capital improvement initiative, our team is committed to providing responsive service, innovative solutions, rigorous quality control, and successful project outcomes. We look forward to partnering with the Town to advance its infrastructure, recreational, transportation, and community development goals throughout the duration of this contract.
Page 134
SECTION V Relevant Experience
Page 135
BL Companies Walsh Intermediate School Softball Field Improvements Branford, CT The Town of Branford sought to enhance the outdoor areas at Francis Walsh Intermediate School, focusing on the middle school’s multi-use athletic fields. This project aimed to revitalize the school’s outdoor spaces for physical education, athletics, recess, and environmental enrichment. To support these goals, BL Companies provided athletic field design and construction administration services. The project renovated an existing underperforming natural grass softball field. It provided regrading of the outfield area for positive drainage, a new irrigation system, new perimeter fence, athletic field lighting and a playscape. The project also provided universal accessibility to enrich the educational and recreational experiences for school and community use. PROJECT FACTS KEY SERVICES Landscape Architecture Civil Engineering Electrical Engineering Irrigation Design Plumbing Design Land Surveying
Page 136
BL Companies Brainard Park Softball Field Enfield, CT The Town of Enfield sought to upgrade the softball field at Brainard Park for recreational and potential high school use. BL Companies was chosen to design the improvements, which included dugout canopies, spectator seating, sports lighting, a new scoreboard, and ADA-compliant pathways. To meet the town’s goals, BL Companies developed a technical design with modified grading, high-performance infield and sand- based root-zone mixes, a sod outfield, and extensive drainage systems. The design also included irrigation, bleachers, dugouts, bullpens, and scoreboards. The improvements ensure the field can meet CIAC standards if needed, while staying within budget and supporting the town’s long-term maintenance capabilities. PROJECT FACTS KEY SERVICES Sports and Recreation Facility Design Landscape Architecture Geotechnical and Structural Engineering Site Engineering Civil Engineering Stormwater Engineering Permitting Electrical Engineering Land Surveying
Page 137
BL Companies Eldredge Park Improvements East Greenwich, RI Eldredge Park was renovated in line with East Greenwich’s recreation master plan, transforming the existing softball field into a flexible space that accommodates flag football and other sports to better serve the community’s needs. The Town of East Greenwich selected BL Companies to transform Eldredge Park, enhancing two basketball courts, redesigning athletic fields, and adding new amenities such as dugout canopies, expanded seating, sports lighting, scoreboards, fencing, and team areas. A new pavilion, perimeter walking path, and ADA-compliant pathways now provide accessible options for both active and passive recreation. The revitalized park balances community needs, offers optimal viewing for spectators, and was designed to align with the town’s budget and maintenance goals. PROJECT FACTS KEY SERVICES Sports and Recreation Facility Design Landscape Architecture Civil Engineering Stormwater Engineering Electrical Engineering
Page 138
BL Companies NCAA Softball Field and Athletic Training Complex Willimantic, CT BL Companies conducted a feasibility study for a new softball field, which led to the funding of the project. An initial study guided the construction of a new parking garage on the existing softball field at the main campus, navigating challenges like wetlands and a stream crossing. BL Companies prepared construction documents for relocating the Eastern Connecticut State University softball field, including features such as high- performance playing surfaces, seating for 1,000 spectators, player amenities, and ADA-compliant access. They managed site planning, design, environmental compliance, and oversaw construction, obtaining necessary approvals for this university expansion project. KEY SERVICES Architecture Civil Engineering Environmental Sciences Land Surveying Transportation Engineering Landscape Architecture Planning
Page 139
BL Companies Fred Wolfe Park Master Plan Orange, CT The Town of Orange, Connecticut engaged BL Companies to develop a comprehensive master plan for Fred Wolfe Park, a 68-acre public recreation space. The Town sought to update its 2013 master plan to better address evolving community needs, safety concerns, and infrastructure limitations. BL worked closely with Town representatives and residents to establish a clear vision and roadmap for future park development—one that promotes accessibility, balances the built and natural environments, and enhances safety, access, and infrastructure.The resulting plan reconfigured existing fields and introduced new athletic areas, proposed sport courts for pickleball, basketball, and tennis, and incorporated new restrooms, pavilions, improved parking and pedestrian circulation, cultural and educational nodes, enhanced playgrounds, maintenance and storage facilities, and a new entrance. PROJECT FACTS KEY SERVICES Landscape Architecture Civil Engineering Survey Traffic Engineering Environmental Master Planning
Page 140
BL Companies Fairfield Parks & Recreation Master Plan Fairfield, CT BL Companies, in partnership with Horsley Witten Group, prepared the Town-wide parks and recreation master plan for Fairfield, CT. The master plan aimed to enhance facilities for both current needs and future growth. BL Companies assessed eleven buildings, identifying deficiencies and required repairs, and compiled existing data. The project included evaluating underused structures, planning for emergency access, environmental protection, cost estimation, and creating a plan for facility improvements. It also addressed multi-generational use, ADA accessibility, aesthetics, and provided funding and implementation strategies. PROJECT FACTS KEY SERVICES Architecture Landscape Architecture Civil Engineering Athletic Facility Design GIS
Page 141
BL Companies Comprehensive Community Services Master Plan East Greenwich, RI The Town of East Greenwich, Rhode Island retained BL Companies to prepare a town-wide parks and recreation master plan. The project created a comprehensive master plan for recreational and conservation areas, including parks and sports complexes, through analysis of existing data, needs assessments, and optimization of site layouts. The plan enhanced facilities, ensured environmental protection, improved aesthetics, and addressed ADA accessibility. It included feasibility studies, cost estimates, and funding recommendations informed by public outreach and surveys, and documented recommendations, costs, and implementation strategies. PROJECT FACTS KEY SERVICES Athletic Facility Design Landscape Architecture Civil Engineering GIS
Page 142
BL Companies Walsh Intermediate School Athletic Field Improvements Branford, CT The Town of Branford sought to enhance the outdoor areas at Francis Walsh Intermediate School, focusing on the middle school’s multi-use athletic fields and softball field. This project aimed to revitalize the school’s outdoor spaces for physical education, athletics, recess, and environmental enrichment. To support these goals, BL Companies provided athletic field design and construction administration services. The project introduced universal accessibility from the school and adjacent parking areas, removed outdated outdoor elements, and added new features to enrich both educational and recreational experiences for the school and the broader community. PROJECT FACTS KEY SERVICES Landscape Architecture Civil Engineering Electrical Engineering Irrigation Design Plumbing Design Land Surveying
Page 143
BL Companies On-Call Architecture and Engineering Services Hartford, CT For over 12 years, BL Companies has been proud to support the City of Hartford with responsive, on-call architectural, engineering, and environmental services tailored to the City’s evolving needs. The City of Hartford uses BL Companies for complex projects requiring specialized expertise. Services include civil, structural, geotechnical, traffic, and architectural work, as well as contract support. Completed projects include City Hall HVAC evaluation, Cleveland Avenue traffic signal replacement, and New Park Avenue Bridge replacement. PROJECT FACTS KEY SERVICES Architecture Civil Engineering MEP Engineering Structural Engineering Transportation Engineering Landscape Architecture Planning
Page 144
BL Companies On-Call Multi-Discipline Engineering & Survey Services Meriden, CT Under an on-call contract, BL Companies is supporting the City of Meriden with responsive, multidisciplinary engineering and land surveying services tailored to meet the City’s evolving needs. BL Companies handles design and construction for various City infrastructure projects, including specialized and general engineering across multiple disciplines. Services include planning, site work, surveying, civil, transportation, structural, electrical, mechanical, geotechnical, hydrological, and environmental engineering. Current on-call projects include sewer bridge design at Leslie Drive, channel improvements from Bradley/Coe Avenue Bridges to Cooper Street Bridge, and a feasibility study for relocating Meriden Soccer Fields. PROJECT FACTS KEY SERVICES Bridge / Structural Engineering Civil Engineering Transportation Engineering Landscape Architecture Land Surveying Environmental Services
Page 145
BL Companies On-Call Architectural and Engineering Services New Britian, CT The City of New Britain selected BL Companies to provide architectural, civil, transportation, and structural engineering support through an on-call contract, helping advance key infrastructure projects across the community. BL Companies’ on-call contract with New Britain provides architectural, civil, transportation, and structural engineering services. Projects include surveying John Downey Drive, inspecting Shultz Pond Brook Bridge, improving Hartford Road sidewalks, designing Ten Acre Road Bridge, and supporting various city buildings and infrastructure. PROJECT FACTS KEY SERVICES Architecture Civil Engineering Environmental Sciences Land Surveying Landscape Architecture MEP Engineering Planning Structural Engineering Subsurface Utility Engineering Transportation Engineering
Page 146
BL Companies On-Call Engineering Services Naugatuck, CT The Borough of Naugatuck has selected BL Companies for an on-call contract to support their ongoing projects and community initiatives. This contract provides civil, transportation, and structural engineering support for infrastructure projects in Naugatuck. BL Companies offers services in design, construction, and consulting, either as the prime vendor or a resource for other consultants. Tasks include civil and traffic engineering, planning, surveying, zoning, geotechnical services, and construction documentation. We also perform evaluations for building renovation, adaptive reuse, or demolition. Completed or near- completion projects include bridge inspections for Parks & Recreation, and cost opinions for various projects and grants. KEY SERVICES Architecture Civil Engineering Environmental Sciences Land Surveying Landscape Architecture MEP Engineering Planning Structural Engineering Subsurface Utility Engineering Transportation Engineering Grant/Funding opportunity support.
Page 147
BL Companies On Call Engineering City of Springfield, MA BL Companies is proud to support the City of Springfield through a multi-year contract, providing responsive and reliable On-Call Engineering services tailored to the City’s needs. The contract includes a wide range of multi-discipline services in the completion of studies, field investigations and reports, preparation of plans and specifications, and contract administration. Specific discipline services include: Civil / site engineering, Highway and street engineering, Drainage, stormwater & flood control systems, Traffic engineering, Environmental permitting, Bridge engineering, Pavement management, Land Surveying & GIS, Building inspection & assessments, Electrical engineering, and Mechanical engineering. PROJECT FACTS KEY SERVICES Land Surveying Civil Engineering Environmental Transportation Engineering
Page 148
BL Companies Tennis Court Facility, UCONN Storrs, CT The University of Connecticut (UCONN) has a new athletic building along Avalonia Way to support the needs of the UConn Tennis Team and enhance the existing Discovery Drive tennis complex. The facility provides essential utilities and dedicated spaces including locker rooms, restrooms, office space, and support areas that improve team operations and overall user experience. To help UCONN achieve these goals, BL Companies provided comprehensive architecture, MEP, and engineering services. The project included the installation of a precast concrete modular building adjacent to the existing Tennis Court facility. BL conducted site surveying, civil engineering, landscape design, grading, architectural planning, structural engineering as needed, and MEP engineering to deliver a functional, well-coordinated building that integrates seamlessly into the athletic campus. KEY SERVICES Architecture Mechanical Electrical & Plumbing Civil Engineering Land Surveying Construction Administration
Page 149
BL Companies Memorial Park Concession Building Southington, CT To enhance the functionality and user experience at Veterans Memorial Park, BL Companies provided comprehensive design services for the renovation of the concession stand, restrooms, team meeting room, and storage building for the Town of Southington. The project involved code improvements, restroom renovations, relocating electrical services, and updates to the roof and exterior, including stone and cement fiber siding. Additional work included exterior painting, parking, dumpster pad, and interior updates like emergency lighting and exit signs. The site was regraded to address stormwater drainage issues, with a new subsurface storm drain detention system designed based on groundwater monitoring to manage drainage around the building. PROJECT FACTS KEY SERVICES Architecture MEP Engineering Civil Engineering
Page 150
BL Companies Recreational Park Pool Building Southington, CT For the Town of Southington, BL Companies delivered comprehensive design solutions to enhance the functionality and experience of the pool building at Recreation Park, including upgraded restrooms, showers, and a lifeguard station. The project scope included code improvements, renovation of the restrooms & showers, relocation of the existing electrical services, new sheltered lifeguard station, new control room, and new roof which enclosed the existing structures as well as provided supplemental shaded areas for pool guests. Interior improvements (emergency lighting, exit signs, painting) were included in the scope. The interior layout was also redesigned for better circulation and to create a single entry point for guests entering the pool area. PROJECT FACTS KEY SERVICES Architecture MEP Engineering Structural Engineering
Page 151
BL Companies Calendar House Senior Center Southington, CT To help the Town of Southington create a welcoming, functional space for its senior community, BL Companies provided comprehensive design and construction administration services for the new Southington Senior Center. The building was constructed on the site of the previous facility, which remained in operation. The space and needs program for the facility was derived from data provided by Center administrators, staff, user members, instructors, volunteers, and members of the general public who attended the open house forums held during the research portion of the study. Further investigations of space requirements for the building were performed through site visits and observations of building usage throughout the survey period. The new facility is approximately 22,000 SF in area and includes fitness, recreation, social, administrative and support areas for the many activities and services offered by the Center. PROJECT FACTS KEY SERVICES Architecture MEP Engineering Structural Engineering Civil Engineering Environmental Sciences
Page 152
BL Companies East Hartford High School Tennis Courts East Hartford, CT BL Companies provided Improvements to four Town-owned tennis courts at the East Hartford High School complex. These improvements were required to accommodate the expanding school athletic programs for the East Hartford public school system. The initial design and due diligence included identifying geotechnical and environmental issues and providing design recommendations. In addition to the design services, BL provided a topographic survey of the site. The final design included the design of four new tennis courts adjacent to the four existing tennis courts. The existing tennis courts were improved with a new surface. Site illumination and fencing was also upgraded. PROJECT FACTS KEY SERVICES Civil Engineering Landscape Architecture Land Surveying Environmental Sciences Geotechnical Engineering
Page 153
BL Companies Portsmouth High School Tennis Courts Portsmouth, NH Portsmouth High School expanded its athletic facilities to support growing programs and better serve the community. With only four Town-owned tennis courts, the school added six new courts to meet the rising demand. BL Companies was contracted to provide design and construction services, beginning with a detailed analysis of geotechnical and environmental conditions and site-specific design recommendations. The project delivered six new tennis courts with shade structures, spectator areas, and wetland plantings, while reusing and upgrading existing lighting and fencing to improve functionality and accessibility. PROJECT FACTS KEY SERVICES Civil Engineering Landscape Architecture Electrical Engineering Construction Administration
Page 154
BL Companies Elmwood Pump Station Cheshire, CT The Town of Cheshire is planning a comprehensive upgrade of the Elmwood Pump Station, its largest wastewater pumping facility, to modernize aging infrastructure and ensure long-term reliability. Originally constructed in the early 1970s and last comprehensively upgraded in 1996, the station serves average daily flows of 1.2 MGD with peak capacities up to 7.0 MGD and plays a critical role in the town’s wastewater system. Building on interim pump replacements completed in 2024, the project will address significant architectural, mechanical, electrical, and structural needs throughout the facility. PROJECT FACTS KEY SERVICES Architecture Environmental Services MEP Engineering Structural Engineering 1
Page 155
BL Companies Stratford Utility Relocation Stratford, CT The Town of Stratford engaged BL Companies to perform an analysis of existing sewer and stormwater utilities along Sniffens Lane and Main Street in support of the redevelopment of the more than 75-acre site formerly occupied by the Stratford Army Engine Plant. BL Companies evaluated existing infrastructure and developed schematic design alternatives for a new sewer main to serve the future development. The resulting design proposes a relocated gravity and force sewer system consisting of 10 new structures and more than 2,800 linear feet of SDR-35 PVC piping. The proposed system also includes construction of a new pump station with a wet well exceeding 30 feet in depth designed to meet flood resiliency criteria. Construction documents are currently being developed as the municipality and development team continue to evaluate redevelopment options for the site. Construction is anticipated within the next two years. PROJECT FACTS KEY SERVICES Civil Engineering Environmental Sciences Land Surveying Landscape Architecture MEP Engineering Planning Structural Engineering Subsurface Utility Engineering Transportation Engineering Architecture
Page 156
BL Companies Sewer Force Main Winchester/Barkhamsted, CT The Town of Winchester Water Pollution Control Authority and the Town of Barkhamsted engaged BL Companies to provide engineering services to connect two low-pressure sewer force mains from Barkhamsted to an existing gravity sewer system in the Town of Winchester. BL coordinated several meetings with the Engineering Departments, Departments of Public Works, and political representatives from both towns to address stakeholder concerns and ensure alignment between the municipalities. Because the system was privately funded and a contractor had already been selected, BL conducted a site visit with the contractor prior to design to coordinate a readily constructible solution, identify potential obstacles, and determine appropriate construction approaches to ensure the needs of both municipalities were met. The resulting design included twin low-pressure force mains totaling approximately 3,500 linear feet, serving both commercial and residential customers, with the ability to expand service to additional users in the future. Based on the success of this project, BL Companies was subsequently awarded a follow-up project to design an additional 1,300 linear feet of force main to serve an over- 55 apartment complex located northeast of Mallory Brook Plaza. PROJECT FACTS KEY SERVICES Civil Engineering
Page 157
SECTION VI References
Page 158
BL Companies References CLIENT NAME CLIENT CONTACT CONTRACT City of New Britain, CT Mark Moriarty, PE Director of Public Works 27 Main Street New Britain, CT 06051 860.826.3374 mark.moriarty@newbritainct.gov On-Call Architectural and Engineering Services, City of New Britain, CT City of Meriden, CT John Lawlor, PE Director of Public Works 142 East Main Street Meriden, CT 06450 203.630.4022 jlawlor@meridenct.gov On-Call Engineering & Survey Services, City of Meriden, CT Town of Branford, CT Alex Palluzi, Jr., Former Parks and Recreation Director and Member of the Branford Public Building Commission Town of Branford 185 Damascus Road Branford, CT 06405 203.637.6378 apjr55@gmail.com Walsh Intermediate School Athletic Field Improvements, Branford, CT Town of Orange, CT John Carangelo, Selectman Town of Orange 617 Orange Center Road Orange, CT 06477 203.397.1808 jjudgejjc@hotmail.com Fred Wolfe Park Master Plan, Orange, CT
Page 159
SECTION VII Services Expected from the Town
Page 160
BL Companies What the Respondent will Expect the Town to Supply The nature and scope of services expected from the Town of Granby in support of the On- Call Engineering Services contract include: · Coordination meetings with appropriate Town representatives who can clarify project / task objectives, define and confirm scope, and establish detailed project requirements · Access to properties, roadways, parks, including buildings, as warranted for a specific project · Police protection when working within the travelway portion of a Town or State right-of- way, not including police protection that may be required during the construction phase of a project · Access to and reprographic images of Town maps, sanitary, storm, and roadway plan and profile drawings, CAD files when available, any as-builts or record documents and or previous conceptual plans if performed if available · Access to historical data, and reports, including financial budgets, traffic studies, drainage reports and sewer studies, environmental and geotechnical reports, and property assessment reports · Written comments for plan review of design drawings and specifications to facilitate a paper trail of correspondence · Use of Town Hall facilities for any Public Information Meetings that may be required.
Page 161
SECTION VIII Cost Proposal
Page 162
Page 7 of 7 APPE NDIX A Cost Proposal Name of Engineering Firm: ___________________________________________________ Services Needed On-Call Engineering and Related Services Ple ase indicate your firm’s hourly fees over the five-year period of the contract Billing Category Hourly Billing Rate Pro ject Manager ________________ Chief Engineer ________________ Engineer ________________ Technician Support ________________ Clerical/Researcher ________________ Other ________________ Othe r Expenses (if applicable): Identify any other categories and costs required to provide Engineering and On-Call services that are not included above: ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ BL Companies Connecticut, Inc. Please see attached hourly rates by billing category. Please see the attached reimbursables.
Page 163
BL Companies Hourly Rates CLASSIFICATION HOURLY RATE ENGINEERING & LANDSCAPE ARCHITECTURE Principal Engineer $240-$300 Principal Landscape Architect 220-250 Senior Project Manager 220-280 Project Manager 180-250 Senior Engineer 175-250 Project Engineer 150-195 Staff Engineer 125-150 Senior Mechanical Gas Designer 180-210 Senior Landscape Architect / Specialist 170-220 Project Landscape Architect / Specialist 140-175 Staff Landscape Architect / Specialist 110-140 Principal Construction Inspector 180-270 Senior Construction Inspector 170-250 Construction Inspector 140-190 Senior Project Coordinator 130-170 Project Coordinator 120-150 Senior GIS Specialist 140-195 GIS Specialist 120-160 GIS Technician 95-130
Page 164
BL Companies Hourly Rates ENGINEERING & LANDSCAPE ARCHITECTURE (cont’d) Senior CADD Designer 130-160 CADD Designer 110-140 Technician 90-110 Senior Administrative Assistant 100-110 Administrative Assistant 75-100 ARCHITECTURE Principal Architect $240-$300 Senior Project Manager 220-280 Project Manager 180-250 Senior Architect 190-250 Project Architect 150-200 BIM Manager 150-190 Senior Architectural Designer 180-230 Architectural Designer 150-200 Designer 125-150 Senior Construction Manager 220-280 Senior Construction Administrator 170-220 Construction Administrator 150-200 Program Analyst 120-150 Project Coordinator 120-150 Construction Coordinator 100-150 Administrative Assistant 75-100
Page 165
BL Companies Hourly Rates SURVEY & SUBSURFACE UTILITY ENGINEERING Principal Land Surveyor $240-$300 Senior Land Surveyor 220-260 Senior Project Manager 220-260 Project Manager 150-220 Senior Survey Technician 145-195 Survey Technician 105-155 Subsurface Utility Specialist 130-175 Crew Chief / 1-Man Robotic Crew 140-190 Instrument Operator 100-125 Rod Person / Technician 90-115 Project Coordinator 120-150 Administrative Assistant 75-100 ENVIRONMENTAL Principal Environmental Scientist $240-$300 Senior Project Manager 220-280 Project Manager 180-250 Senior Environmental Scientist 180-250 Senior Project Scientist 150-210 Project Scientist 120-195 Staff Scientist 110-150 Senior Environmental Inspector 140-190
Page 166
BL Companies ENVIRONMENTAL (cont’d) Environmental Inspector 105-145 Environmental Quality Control Coordinator 120-190 Senior GIS Specialist 140-195 GIS Specialist 120-160 GIS Technician 95-130 Field Technician 90-110 Senior Administrative Assistant 100-110 Administrative Assistant 75-100 The Hourly Billing Rates shall remain in effect for work done during the calendar year. Consultant typically adjusts its Hourly Billing Rates on January 1. BL Companies will submit to the Town rate increase requests in future years if applicable or required and mutually negotiate acceptable rates. Hourly Rates
Page 167
BL Companies Reimbursable Expenses CLASSIFICATION RATE ($) FEDEX VARIES MILEAGE .725 (IRS STANDARD RATE) B&W COPY 11x17 .127 B&W COPY 8.5x11 .065 COLOR COPY 11x17 .743 COLOR COPY 8.5x11 .435 COLOR PLOT PER SQ FT 1.551 COLOR PLOT WITH FOAM BOARD 7.651 COVERS 11x17 3.574 COVERS 8.5x11 1.787 B&W PLOT PER SQ FT .147
Page 168
SECTION IX Contract Exceptions
Page 169
BL Companies Contract Exceptions Thank you for the opportunity to provide term exceptions. We have reviewed the RFP and take exception to the terms of the indemnification clause, as specifically described below. To address these concerns, we note several targeted revisions in the attached sample, which we believe would align the terms with industry standards for design professional firms and the requirements of our professional liability coverage. If selected by the Town, we request the opportunity to discuss these concerns and negotiate mutually agreeable contract terms. The revisions include: • Removal of the duty to defend, as it is broader than the duty to indemnify and could improperly obligate us to cover attorneys’ fees without any determination of fault. • Narrowing the scope of indemnified parties to avoid extending obligations to unknown third parties, such as the Town’s independent contractors, with whom we have no contractual relationship. • Revised indemnification language to apply only to the extent damages are caused by our negligence, consistent with the coverage provided under our Professional Liability insurance. • Relatedly, we removed the term “sole” in reference to the Town’s negligence to reflect the possibility of comparative or contributory negligence, ensuring each party bears responsibility proportionate to its role in causing a loss. • Finally, with respect to insurance requirements, while we can meet the stated coverage limits, please note that our Professional Liability policy covers negligent acts, errors, or omissions and includes a $150,000 deductible.
Page 170
Page 5 of 7 5. Professional Liability. One Million Dollars ($ 1,000,000.00) coverage per occurrence for each site or project for all damages arising out of bodily injury, personal injury, and property damage. 6. Deductibles and Self-Insured Retentions: Any deductible or self-insured retention must be declared to and approved by the Town of Granby. All deductibles or self-insured retentions are the sole responsibility of the awarded Respondent to pay and/or to indemnify. 7. Errors and Omissions Insurance. The awarded Respondent shall provide and maintain Errors and Omissions Insurance with minimum limits of $2,000,000 per occurrence/annual aggregate. The policy shall not have a deductible greater than $50,000.00. The Town of Granby shall be named as “Additional Insured.” Coverage is to be provided on a primary, noncontributory basis. Waiver of subrogation in favor of the Town of Granby is required on all applicable policies, including workers’ compensation. If any policy is written on a “Claims Made” basis, the policy must be continually renewed for a minimum of two (2) years from the completion date of the Contract. If the policy is replaced and/or the retroactive date is changed, then the expiring policy must be endorsed to extend the reporting period for claims for the policy in effect during the Contract for two (2) years from the completion date. Defense, Hold Harmless and Indemnification The successful proposer agrees, to the fullest extent permitted by law, to defend, indemnify, and hold harmless the Town, its employees, officers, officials, agents, volunteers and independent contractors, including any of the foregoing sued as individuals (collectively, the “Town Indemnified Parties”), from and against all proceedings, suits, actions, claims, damages, injuries, awards, judgments, losses and expenses, including attorney’s fees, arising out of or relating, directly or indirectly, to the successful proposer’s malfeasance, misconduct, negligence or failure to meet its obligations under the RFP or the Contract. The successful proposer’s obligations under this section shall not be limited in any way by any limitation on the amount or type of the successful proposer’s insurance. Nothing in this section shall obligate the successful proposer to indemnify the Town Indemnified Parties against liability for damage arising out of bodily injury to persons or damage to property caused by or resulting from the sole negligence of the Town Indemnified Parties. In any and all claims against the Town Indemnified Parties made or brought by any employee of the successful proposer, or anyone directly or indirectly employed or contracted with by the successful proposer, or anyone for whose acts or omissions the successful proposer is or may be liable, the successful proposer’s obligations under this section shall not be limited by any limitation on the amount and type of damages, compensation or benefits payable by the successful proposer under workers’ compensation acts, disability benefit acts, or other employee benefits acts. The successful proposer shall also be required to pay any and all attorney’s fees incurred by the Town Indemnified Parties in enforcing any of the successful proposer’s obligations under this section, which obligations shall survive the termination or expiration of this RFP and the Contract. As a municipal agency of the State of Connecticut, the Town will NOT defend, indemnify, or hold harmless the successful proposer. These insurance requirements are not meant to be construed as a limitation of liability. The parties agree that the amounts of insurance under this Agreement do not, in any way, limit the Respondent’s liability to the Town of Granby by virtue of this promise to indemnify and hold the Town of Granby
Page 171
Submitted to: Mike Walsh Town Manager Town of Granby 15 North Granby Rd. Granby, CT 06035 Submitted by: Paul Furgal, PE, PTOE New England Deputy Regional Manager Bowman 94 North Elm St., Suite 210 Westfield, MA 01085 413.875.8855 | pfurgal@bowman.com Town of Granby Request for Proposals Professional Engineering Services July 24, 2026
Page 172
Table of Contents 01 Firm Profile 02 Key Personnel 03 Relevant Experience 04 References 05 Project Approach & Understanding 06 Fee Schedule
Page 173
July 24, 2026 Mike Walsh Town Manager Town of Granby 15 North Granby Rd. Granby, CT 06035 RE: Town of Granby | Request for Proposals for Professional Engineering Services Dear Mr. Walsh: Bowman is pleased to submit our proposal to provide Professional Engineering Services to the Town of Granby. We appreciate the opportunity to support the Town as a trusted engineering partner for the planning, design and construction of municipal infrastructure and recreational improvements over the next five years. Bowman offers a multidisciplinary team of licensed engineers, landscape architects, surveyors and construction professionals with extensive experience delivering municipal engineering services throughout Connecticut and New England. Our team has successfully planned, designed and managed a wide range of public projects, including athletic field and track improvements, parks and recreation facilities, roadway and pedestrian enhancements, utility and drainage infrastructure, and ongoing on-call engineering services for municipalities. We have extensive experience working with municipalities similar in size, character and infrastructure needs to the Town of Granby, allowing us to provide practical, responsive and cost-effective solutions on a project-by-project basis. Key staff members Jon Allard and Stephanie MacDonald began their careers in Connecticut, spending their first seven years working in Simsbury and Manchester, where they gained extensive experience across a wide range of roadway, parks and recreation, site development, state, municipal, and private projects. Stephanie’s experience working in Manchester Connecticut included the preparation of technical designs for a variety of site development, stormwater management, and roadway projects, including utility design, traffic management, specification and bid documents, and permitting coordination. As a landscape architect and project manager, Jon designed and worked on a variety of projects while working in Simsbury and Manchester offices. His experience includes municipal parks and recreation projects, athletic fields and court design, streetscape and roadway design, housing and subdivision development, University and school facilities and various planning projects. This early work provided both Jon and Stephanie with a strong foundation in multidisciplinary project delivery and fostered a deep understanding of Connecticut’s local conditions and state and municipal standards. We understand that the Town is seeking a responsive consultant capable of supporting both the replacement of the high school/middle school athletic track and adjacent athletic fields, as well as a variety of municipal capital improvement projects through a task-order approach. Our team is prepared to provide practical, cost-effective engineering solutions while maintaining open communication, meeting project schedules and delivering high- quality technical services tailored to the Town’s needs. Bowman’s strength lies in our ability to provide comprehensive in-house services throughout every phase of a project, from planning and permitting through design, bidding, construction administration and closeout. We take pride in building long-term partnerships with our municipal clients by providing responsive service, experienced project management and a collaborative approach that helps communities successfully implement their capital improvement programs. Cover Letter
Page 174
Primary Point of Contact Paul Furgal, PE, PTOE New England Deputy Regional Manager 860.602.8700 pfurgal@bowman.com I will serve as the primary point of contact for the duration of this contract and will coordinate all staffing, task assignments, and communications in accordance with the RFQ’s contract management requirements. We appreciate your consideration of our qualifications and look forward to the opportunity to partner with the Town of Granby. Thank you for your time and consideration. Sincerely, Paul Furgal, PE, PTOE New England Deputy Regional Manager
Page 175
E Firm Profile 01 SECTION
Page 176
6 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 About Us Locally, Bowman specializes in delivering innovative engineering, transportation and transit planning, traffic engineering, highway and roadway design, landscape architecture, public engagement, and construction services. With more than 2,500 professionals across 108 offices—nine of which are located in New England—our firm brings 49 years of transportation experience, often involving close collaboration with multidisciplinary teams. Our New England region includes offices in: Windsor, CT; Westfield, Boston, and Taunton, MA; Lincoln, RI; Biddeford, ME; Williston, VT; and Etna, NH. As a local firm, we are well-versed in regional conditions and standards, and our proximity to the Town of Granby allows us to be on-site promptly when needed. Although the Bowman name is newer to New England, our staff continues to provide the same expertise, responsiveness, and commitment to our clients and projects that we delivered for many years as McMahon Associates. Why We’re Different Our team approaches every project with a strong emphasis on creativity, problem-solving, and collaboration. We work closely with our clients to understand their goals and to shape engineering solutions that are functional, sustainable, and tailored to community needs. Drawing from the diverse backgrounds of our planning and engineering professionals, we are able to address complex challenges while keeping long-term system performance and user experience at the forefront. We bring extensive engineering experience delivering practical, innovative, and cost-effective solutions for municipalities and public agencies. Our team has successfully completed a wide range of civil engineering projects, including public infrastructure improvements, utility systems, parks and recreation facilities, site development, stormwater management, and municipal facility improvements. By combining technical expertise with a collaborative approach, we develop designs that are resilient, sustainable, and tailored to each community’s needs while supporting long-term functionality. EXPERIENCE WITH PROVIDING INNOVATIVE SOLUTIONS AND ALTERNATIVES Bowman’s experience is unique in that we provide services to a wide range of clients, with differing needs, issues, and priorities. We work closely with municipalities, regional planning agencies, state DOTs, transit agencies, higher education institutions and school districts, and private clients on comprehensive design projects and improvements in both urban and rural settings. While each of these clients has individual perspectives towards their needs, Bowman has successfully been able to not only address their needs, but to help them see the “bigger picture” and work in a comprehensive manner towards the most effective solutions. Bowman has developed safe and efficient projects that improve mobility and create more livable and healthy communities. Our diverse staff takes an innovative, forward-thinking, comprehensive approach to all of our projects. 49 Years in Business (Combined) 108 Offices Nationwide 2,500 Number of Employees (Approx.) Firm Profile
Page 177
7 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 As requests for on-call engineering services occasionally arise from emergency situations, Bowman is uniquely positioned to respond quickly to the Town’s needs by combining local presence with the resources of a multidisciplinary engineering firm. Upon receiving a task assignment, we promptly identify the most qualified staff for the project, establish a clear scope, schedule, and project management plan, and mobilize our team to begin work efficiently. Our Westfield Massachusetts office, just a short drive up Route 202, is located less than 20 minutes from Granby. This allows our staff to quickly attend meetings, conduct field investigations, and respond to unforeseen issues without delay. Our multidisciplinary team provides comprehensive civil engineering services for municipalities, with expertise in planning, design, and construction of drainage and stormwater systems, water and sewer utilities, roadways, parking facilities, parks, public spaces, pedestrian infrastructure, and municipal facilities. Services include engineering assessments, feasibility studies, condition evaluations, and conceptual through final design, supported by in-house structural, environmental, geotechnical, surveying, landscape architecture, and permitting expertise. Bowman has extensive experience in stormwater management and resiliency planning, including the evaluation and design of drainage systems to address localized flooding, erosion, and aging infrastructure. Our designs incorporate green infrastructure and low impact development practices while meeting current CTDEEP Stormwater Quality Manual requirements for water quality treatment, groundwater recharge, and runoff volume management. Our senior engineering staff also have significant experience with FEMA Hazard Mitigation Grant Program (HMGP) projects, flood mitigation planning, and resilient infrastructure improvements that help municipalities prepare for future climate-related challenges. In addition to engineering design, Bowman serves as a trusted partner throughout project implementation by coordinating with agencies such as ConnDOT, CTDEEP, regional utility providers, and local departments, boards, and commissions. Whether assisting with a small municipal repair or managing a complex, multi-discipline capital improvement project, our team provides proactive communication, technical leadership, and responsive project management to help communities successfully achieve their goals. EXPERIENCE WORKING WITH GOVERNMENT AGENCIES In addition to working with state departments, Bowman serves local municipalities and planning agencies. As such, we are keenly aware of the needs of public sector clients, especially related to sound development growth from the perspective of a municipality. Bowman works interactively with clients and project stakeholders and, when appropriate, modifies the interactive process to draw out the input, priorities, and ultimate strategies of a group. Bowman has extensive experience in managing on-call contracts for municipalities and we will bring that expertise to the Town of Granby to deliver assignments on-schedule and on-budget. EXPERIENCE PREPARING AND ADMINISTERING GRANT DOCUMENTATION Bowman brings extensive experience supporting municipalities across New England in securing and managing federal and state funding opportunities including RAISE, SS4A, as well as recreational funding opportunities including LWCF, CDBG and PARC. We are prepared to provide the Town of Granby with the same level of strategic, hands-on assistance as needed. Our team helps communities navigate competitive grant programs by identifying eligible projects, developing strong, data-driven applications, and assembling the technical materials needed to demonstrate readiness and value. This may include preparing concept-level plans, cost estimates, project schedules, Benefit-Cost Analyses, safety assessments, and environmental research that align with federal regulations. We also assist with coordinating regional partners, public safety departments, elected officials, and community stakeholders to build broad support of the application. Once funds are awarded, Bowman can provide post-award services to ensure the Town remains in full compliance with federal and state requirements. This includes tracking milestones, preparing required reporting, assisting with documentation and reimbursement, and supporting project delivery through design, permitting, and construction.
Page 178
E Key Personnel 02 SECTION
Page 179
9 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Organizational Chart Key Resume Included Contract Manager Paul Furgal, PE, PTOE QA/QC Manager Jason Adams, PE, PTOE Site Engineering/Stormwater Management Angela Saunders, PE Stormwater Management - Task Lead Stephanie MacDonald, PE Site Engineering/Stormwater Management Engineer Landscape Architecture Jon Allard, RLA Landscape Architecture - Task Lead Paul Simon, RLA Landscape Architect Traffic Engineering Erin Fredette, PE Traffic Engineering - Task Lead Matt Taylor, PE Traffic Engineer Construction Administration Antonia Thomas Construction Administration - Task Lead Deputy Project Manager Jon Allard, RLA Roadway/Transportation Paul Furgal, PE, PTOE Roadway/Transportation - Task Lead Matt Taylor, PE Roadway/Transportation Engineer
Page 180
10 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Paul Furgal is a senior project manager and Westfield office lead who has over 28 years of experience in transportation engineering services. He specializes in Complete Streets, roadway design, utility design, traffic signals, traffic studies, and construction administration for public and private clients. His experience includes numerous transportation projects under MassDOT, CTDOT and municipal jurisdictions. In recent years, Paul has focused on the design development of urban roadways, streetscapes, and roundabouts, serving as both a designer and project manager to municipalities under the MassWorks funding program. His experience also includes various Complete Streets projects that have enhanced pedestrian and bicycle accessibility. Experience City of Westfield, Union Street at Springdale Road Intersection Improvements | Westfield, MA Project manager. Responsible for engineering design, traffic analysis and construction administration services for Union Street/Springdale Road intersection improvements. Responsible for overseeing a team of transportation engineers through the design of intersection and roadway improvements as well as preparation of final design plans and contract documents. City of Westfield, Peer Review for Roots Academy Proposal | Westfield, MA Project manager. Responsible for a traffic and parking peer review of a proposed 580-student school in Westfield. Responsible for evaluating a proposed site plan and traffic analyses provided in a traffic study prepared for the development. The review found that the traffic study was understating trip generation estimates and their impact on the site and surrounding roadway network. In addition, site plan circulation and parking issues between buses and parked vehicles were identified. These issues were documented and relayed to the Planning Board. City of Easthampton, Ferry Street Improvements | Easthampton, MA Project manager. Responsible for overseeing a team of engineers for the design of a mini-roundabout, its integration with Manhan Rail Trail crossing, the addition of new on-street parking, and accessibility improvements for pedestrians and bicycles as part of a funding application submitted to MassWorks. Also responsible for overseeing construction administration activities for this roadway infrastructure and Complete Streets improvement project. City of Cambridge, Grand Junction Multi-Use Path | Cambridge, MA QA/QC designer. Provided design QA/QC for improved connections to other multi- use paths in the region and for future two-track rail transit service along the Grand Junction right-of-way. Our firm is part of a multi-disciplinary team responsible for assisting the City of Cambridge to support the city’s goals with regard to active transportation, complete streets, Vision Zero, and neighborhood context to develop the Grand Junction Multi-Use Path. Education B.S. Civil Engineering, Merrimack College, 1998 Registrations Professional Engineer: Massachusetts (#47532) Connecticut (#26326) New Hampshire (#12197) Professional Traffic Operations Engineer Associations Institute of Transportation Engineers, Member Town of Southampton Planning Board, Member Year Started with Bowman 2017 Year Started Professional Experience 1998 Paul Furgal, PE, PTOE Project Role: Contract Manager; Roadway/Transportation Task Lead
Page 181
11 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Paul Furgal, PE, PTOE Project Role: Contract Manager; Roadway/Transportation Task Lead City of Cambridge, Inman Square Intersection Safety Improvements | Cambridge, MA QA/QC designer. Responsible for QA/QC review. This project developed multimodal safety improvements in alignment with the principles of the Vision Zero Action Plan for the City of Cambridge. Design elements included separated bicycle lanes, protected intersection treatments, and improved pedestrian facilities; improving and simplifying operations for all modes; design of bus stops; provisions for on-street parking and loading; and continuing to support the local, residential and business communities that define Inman Square. Granite Street Intersection Improvements | City of Quincy, MA Bowman was contracted to perform engineering services on this project to accommodate complete street improvements at Granite Street and Walter J. Hannon Parkway, Granite Street at Thomas E. Burgin Parkway, and Granite Street at Whitwell Street. The project included a Road Safety Audit (RSA) for a segment of Thomas E. Burgin Parkway, between Walter J. Hannon Parkway and Granite Street. Our firm was responsible for evaluating existing and future conditions, traffic projections and developed design plans for intersection layout, pavement design and resurfacing, drainage and watermain replacement, and construction documents for the proposed intersections. City of Springfield, West Street Corridor | Springfield, MA Project manager. Bowman provided design, public engagement, transportation planning and engineering services for the West Street and Plainfield Street corridor improvements. The project was focused on improving safety, enhancing pedestrian travel within the study area and supporting transit services. The project included the design of shared-use paths, community gateway enhancements, a landscaped median with mid-block crossing and High Intensity Activated Crosswalk (HAWK) system as well as safety improvements to pedestrian crossings at the Connecticut Riverwalk and Bikeway. Town of Walpole, Coney Street Improvements | Walpole, MA Project manager. Managed the project team for engineering design services for roadway and traffic signal improvements to approximately 1,700 feet of Coney Street from its intersection with the Walpole Mall Driveway to its intersection with Joseph Lane. This project included the design of a new traffic signal system, roadway widening, utility relocations and pedestrian crosswalks and signal to enhance the safety of pedestrians.
Page 182
12 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Jason is the Bowman New England Regional Manager and Boston office manager with 25 years of experience in traffic engineering and transportation planning for government/public sector and commercial/private sector clients. He has worked on all phases of traffic assessments, traffic impact studies, and parking assessments from initial data collection through final report submission, including existing and future forecast analysis, trip generation analysis, capacity analysis, Synchro modeling, VISSIM modeling, and other traffic engineering tasks. He has completed peer reviews of a wide range of projects throughout Massachusetts and has worked to ensure projects fit within their given communities. Jason has experience reviewing and improving pedestrian and bicycle accommodations and has a focus on improving the safety and operation of all modes of transportation. He also has experience completing road safety audits and safety review prompt lists. His work continues to involve comprehensive and complex transportation engineering and planning projects, while he also has experience in report writing, public presentation, research, surveys, proposal preparation, scheduling, and cost estimating. Jason has extensive experience in analyzing and understanding project impacts to area roadways and intersections and has authored hundreds of technical submissions. Experience City of Westfield, Infrastructure Improvements | Westfield, MA Project engineer. Responsible for supervising the data collection efforts and preparation of the traffic impact study for a new retail center, the Westfield Pavilion in the City of Westfield. Other responsibilities included performing capacity analyses at 24 study area intersections using the Synchro software and making recommendations for a mitigation program that included integrating three new traffic signals into a coordinated system, reconfiguring traffic flow patterns on three study area roadways, and introducing a new entrance onto the Massachusetts Turnpike. City of Quincy, Cliveden Street Extension Review | Quincy, MA Project manager. Responsible for coordinating with the City of Quincy to determine appropriate intersection and roadway improvements based on anticipated development phasing. Worked with the City to establish potential future impact of full build out for key parcels within the study area, including providing capacity analysis and overall impact for various uses, including a proposed parking structure. As a subconsultant, our firm supported the City of Quincy in the planning of the Cliveden Street Extension and the intersection of Cliveden Street with Hancock Street as part of ongoing improvements related to the construction of a new connection from Thomas E. Burgin Parkway. Our efforts focused on new traffic patterns in the vicinity of Cliveden Street and determining new traffic control improvements. City of Cambridge, Pearl Street On-Street Parking Study | Cambridge, MA QA/QC officer. Responsible for quality control on the report production that Education B.C.E. Civil Engineering, University of Delaware, 2000 Registrations Professional Engineer: Massachusetts (#50414) New Hampshire (#12573) Connecticut (#30832) Maine (#12573) Professional Traffic Operations Engineer Associations International Council of Shopping Centers, Member Institute of Transportation Engineers, Member Year Started with Bowman 2000 Year Started Professional Experience 2000 Jason Adams, PE, PTOE Project Role: QA/QC Manager
Page 183
13 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Jason Adams, PE, PTOE Project Role: QA/QC Manager documented the extents of the survey area, methodology, survey analysis and results of the study in tabular and graphic format.. Our firm conducted a parking occupancy survey on Pearl Street, and adjacent side streets, in the Cambridgeport neighborhood. The survey was conducted during the morning, afternoon and overnight periods, over three days, to determine average parking demand and the potential to eliminate parking along one side of Pearl Street to facilitate proposed bicycle accommodations. Inman Square Intersection Safety Improvement Project | Cambridge, MA Lead traffic engineer. Led the traffic analysis for the Inman Square Intersection Safety Improvements Project. The purpose of the project was to develop multimodal safety improvements by providing separated bicycle lanes, protected intersection treatments, and improved pedestrian facilities; improving and simplifying operations for all modes; design of bus stops; provisions for on-street parking and loading; and continuing to support the local, residential and business communities that define Inman Square. Led traffic analysis in Synchro and VISSIM to quantify the alternatives intersection operations. Documented analysis results and design of best practices in a technical memorandum of the alternatives analysis. Traffic Engineering Services, Various Medical Facilities | Various Locations, MA Traffic engineer. Completed traffic and parking assessments on a variety of medical facilities. Completed parking demand and parking generation studies to understand the parking impacts of expanding services and increasing the size of medical buildings. Completed trip generation reviews to determine the changes in vehicle trips associated with medical projects and assessed the impacts of additional vehicles on the surrounding roadway network. Worked with medical facility project teams to make sure that appropriate pedestrian, bicycle and emergency vehicle connections exist on the site. Is experienced with permitting medical facility projects on the state and local level. City of Cambridge, Pearl Street On-Street Parking Study | Cambridge, MA QA/QC officer. Responsible for quality control on the report production that documented the extents of the survey area, methodology, survey analysis and results of the study in tabular and graphic format.. Our firm conducted a parking occupancy survey on Pearl Street, and adjacent side streets, in the Cambridgeport neighborhood. The survey was conducted during the morning, afternoon and overnight periods, over three days, to determine average parking demand and the potential to eliminate parking along one side of Pearl Street to facilitate proposed bicycle accommodations.
Page 184
14 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Jon Allard is a project manager and landscape architect with 20 years of professional experience in project management, planning, landscape and site design analysis, graphic visualizations and presentations, and construction oversight for various project types, including transportation, housing, universities and schools, municipal parks, industrial development and private development. Jon started his career in Connecticut and is now managing a wide variety of projects throughout New England. Experience Filley Park Improvements* | Bloomfield, CT Provided landscape architecture and design services for improvements at Filley Park in Bloomfield, Connecticut, focused on enhancing recreation, accessibility, and the overall visitor experience while preserving the park’s character. Services included conceptual and detailed landscape design, planting plans, grading and ADA accessibility, site furnishing and material selection, and coordination with the multidisciplinary design team. Improvements featured an enhanced streetscape, natural playground, educational nature trails, ice skating and fishing amenities, a picnic pavilion, outdoor fireplace, and the transformation of the park’s island into an arboretum and event space. Central High School* | Springfield, MA Project manager. Planning and design of a comprehensive athletic field modernization project at Central High School in Springfield MA. The project replaced the existing natural grass baseball field with a state-of-the-art synthetic turf baseball field while also converting an existing natural turf practice field into a versatile synthetic turf multi-sport field designed to accommodate football, soccer, lacrosse, softball, and other school and community athletic programs. Supporting improvements included the construction of a new ADA accessible press box, bleachers, walkway enhancements and installation of sports field lighting. Berkshire Community College Athletic Field* | Pittsfield, MA Project manager. Development of a multi-sport synthetic turf field (Gene Dellea Community Turf Field). The project included the complete replacement of the existing natural grass field with a synthetic turf system designed to accommodate multiple sports while significantly increasing field availability and reducing long- term maintenance requirements. Supporting improvements included new athletic amenities, ADA accessible press box and bleacher system built into existing slope, accessible pedestrian circulation, and sports lighting. A key component of the project was the integration of sustainable site design and stormwater management practices. Working collaboratively with civil and environmental engineers, the site was designed to effectively collect, convey, and treat stormwater runoff while protecting adjacent wetlands and sensitive environmental resources. Education B.S. Landscape Architecture & Regional Planning, University of Massachusetts, 2006 Registrations Registered Landscape Architect: Massachusetts (#4206) Rhode Island (#748) Connecticut (LAR.0001732) Year Started with Bowman 2022 Year Started Professional Experience 2006 Jonathan Allard, RLA Project Role: Deputy Project Manager; Landscape Architecture - Task Lead *Project completed with a previous employer
Page 185
15 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Pope Francis Preparatory School* | Springfield, MA Project manager. This project consisted site master planning and design development of traffic and pedestrian control solutions, handicap accessibility applications, design and construction of tennis courts, baseball and softball fields, a practice field, and a synthetic turf multi-sport field with track and press box/bleacher system. The site also included separate pick up and drop off areas for parents and buses and a large parking area and bio-retention system. Responsibilities included master planning and graphic design, design development documentation, construction documentation and construction inspection services. City of Lowell, Muldoon Park Improvements & ADA Kayak Launch | Lowell, MA Project manager and lead designer for the City’s first open-to-the-public accessible kayak launch. The project included a detailed topographic and bathymetric survey of the project area, wetland delineation, and the identification of invasive species along the Concord riverbank. The project included securing Chapter 91 licensing for access to Massachusetts waterways, conceptual planning graphic, design development, construction documentation and construction oversight. Commencing of construction is anticipated for the spring 2025. City of Springfield, Redevelopment of Donna Blake Park | Springfield, MA Project manager, lead designer and project manager. Responsible for initial conceptual design through project construction for the redevelopment of an urban neighborhood park. The design features included a splash pad, accessible playground with rubberized surfacing ADA compliant walkways, a large pavilion, accessible picnic tables, site furnishings and landscape and drainage improvements. City of Springfield, West Street Corridor Improvements | Springfield, MA Project manager. Responsible for managing the conceptual design and assisting in public outreach and engagement for transportation planning and engineering services for the West Street and Plainfield Street corridor by improving safety, enhancing pedestrian travel within the study area, and supporting transit service provided by PVTA buses. The project included the design of shared-use paths, community gateway enhancements, a landscaped median with mid-block crossing and High Intensity Activated Crosswalk (HAWK) system as well as safety improvements to pedestrian crossings at the Connecticut Riverwalk and Bikeway and highway on and off ramps. City of Easthampton, Main Street (Route 10) Design Services | Easthampton, MA Landscape architect and designer. Responsible for the redesign of the downtown corridor (Main Street, Route 10) in Easthampton. The project included streetscape enhancements, improving overall safety for all users, increased walkability, and reimagined bicycling and transit infrastructure. Participation in public outreach included public meetings and stakeholder and citizen walkshops. Jonathan Allard, RLA Project Role: Deputy Project Manager; Landscape Architecture - Task Lead
Page 186
16 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Erin Fredette is a senior project manager with over 17 years of transportation planning, traffic engineering and public transit experience. Her transportation planning work includes trip generation and distribution, forecast analysis, capacity analysis, Synchro modeling and VISSIM modeling. As a specialist in traffic engineering, Erin has been involved in a variety of projects from simple data collection to complex conceptual design development and analysis as part of a larger multi-disciplinary team. Incorporation of transit, pedestrian and bicycle accommodations has been a focus for many of her projects ensuring safe and efficient operations for all modes of transportation. She has conducted numerous traffic impact studies as well as peer reviews for a number of municipalities within New England, reviewing proposed mitigation and presenting in public forums. Erin’s experience with public transit includes conceptual design, development of graphic materials, participation in public outreach and detailed evaluation of potential impacts of transit priority measures on other modes of transportation. She continues to be involved in a variety of traffic engineering and planning projects in both the public and private sector. Experience Inman Square Intersection Safety Improvements | City of Cambridge, MA Transportation engineer who led traffic analysis in Synchro and VISSIM to analyze and depict the intersection operations under the preferred alternative. Documented analysis results and design best practices in a technical memorandum of the alternatives analysis. The purpose of the project was to develop multimodal safety improvements in alignment with the principles of the Vision Zero Action Plan for the City of Cambridge. Design elements included separated bicycle lanes, protected intersection treatments, and improved pedestrian facilities; improving and simplifying operations for all modes; design of bus stops; provisions for on-street parking and loading; and continuing to support the local, residential and business communities that define Inman Square. River Street Reconstruction | City of Cambridge, MA Lead transportation engineer responsible for developing an extensive transportation analysis model of the River Street corridor and Central Square area for use in evaluating potential future transportation infrastructure improvements. Detailed calibration of the existing and future models helps provide accurate information for decisions to be made regarding potential trade-offs with accommodating each mode of transportation along the River Street corridor. Modeling for the project includes VISSIM modeling of specific bus route and layover alternatives to understand the travel times and delay impacts associated with various routing and layover options. Evaluation of corridor alternatives include feasibility of an exclusive bus lane and transit signal priority along River Street. Responsible for developing an extensive transportation analysis model of the River Street corridor and Central Square area for use in evaluating potential future transportation infrastructure improvements. Education B.S. Civil Engineering, Northeastern University, 2009 Registrations Professional Engineer: Massachusetts (#51050) Presentations Transportation and Stormwater 101, Southern New England American Planning Association (SNEAPA), October 2019 Pedestrian/Bike Safety & Liability, Penn State University (PSU) Safety Conference, December 2017 Year started with Bowman 2009 Year started Professional Experience 2008 Erin Fredette, PE Project Role: Traffic Engineering - Task Lead
Page 187
17 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Evaluation of corridor alternatives included feasibility of an exclusive bus lane and transit signal priority along River Street. Grand Junction Multi-Use Path Design | City of Cambridge, MA Transportation engineer responsible for collaborating with the project team on the development and calibration of the VISSIM model along the Massachusetts Avenue corridor, including in the refinement of Synchro analysis to try and address the signalized intersection directly adjacent to the proposed Grand Junction crossing across Massachusetts Avenue. The project will provide improved connections to other multi-use paths in the region and preserve the opportunity for future two-track rail transit service along the Grand Junction right-of-way. MassDOT, McGrath Boulevard Design | Somerville and Cambridge, MA Senior project engineer involved with the McGrath Boulevard project from the early stages of the planning study through to the current project development and environmental permitting phase of the project. Aided in the evaluation of potential conceptual design alternatives for the removal of an elevated highway in the City of Somerville. Responsible for tasks such as development of existing and future traffic volume networks through coordination with the Central Transportation Planning Staff and the application of their regional traffic demand model; evaluation of issues and opportunities for each of the proposed conceptual alternatives; completion of capacity analysis using Synchro software for existing and future traffic conditions at over 30 study area intersections; development of graphics, tables, reports and presentations for public use. BPDA, Mt. Vernon Street Re-Design | Boston, MA Senior project engineer responsible for evaluating multimodal transportation needs as part of a Complete Streets review and design of Mt. Vernon Street in Dorchester. Conducted a review of the existing conditions and evaluated the existing traffic volumes and patterns through capacity analysis. Identified and summarized various future-year scenarios including proposed area development, future mode splits and potential traffic pattern changes. Developed concepts for various roadway cross- sections and designs including potential cycle tracks, sidewalks, travel lanes and opportunities for landscape architecture and “tactical urbanism.” Facilitated discussion during meetings associated with public outreach efforts for the project. Erin Fredette, PE Project Role: Traffic Engineering - Task Lead
Page 188
18 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Angela Saunders is a senior project manager who has 26 years of experience in the field of stormwater design, permitting, transportation engineering, civil/site engineering, and construction management. Angela has been a project manager for over 9 years, and she has led a variety of projects including roadway improvements, bus stop improvements, curb ramp design, and site improvements. Angela has extensive experience with National Environmental Policy Act (NEPA) documentation, state and federal environmental permits, stormwater management and drainage design, culvert replacements and watershed analysis. Angela’s experience encompasses preparing contract specifications, engineer’s estimates, bid documents and construction services. Experience City of Westfield, On-Call Engineering Services | Westfield, MA Stormwater project manager. Our firm is providing professional engineering services on an as-needed basis. Responsible for performing peer reviews of stormwater designs to determine if the design meets City, State, and industry standards. Town of Walpole, Coney Street Improvements | Walpole, MA Lead stormwater/permitting engineer. Our firm provided engineering design services for roadway and traffic signal improvements to approximately 1,700 feet of Coney Street from its intersection with the Walpole Mall Driveway to its intersection with Joseph Lane. Responsible for the analysis of the stormwater impacts from the project to the MassDOT drainage system on Route 1. Designed a bio-retention dry swale and leaching catch basins to provide stormwater quality and quantity treatment prior to entering MassDOT’s storm drain system on Route 1. Responsible for the stormwater management report and coordination with MassDOT for the access permit to maintain the drainage connection. City of Easthampton, Ferry Street Improvements | Easthampton, MA Project manager for QA/QC & permitting. Our firm was prime consultant for this roadway infrastructure and Complete Streets improvement project, which is adjacent to Lower Mill Pond. Our firm designed a mini-roundabout and integrated it with Manhan Rail Trail crossing, provided on-street parking and accessibility improvements for pedestrians and bicycles. Provided QA/QC for the Notice of Intent with the City. City of Providence, Safe Streets for All Project | Providence, RI Senior project manager. The Safe Streets for All Projects (SS4A) are funded through a $27.2 million federal grant which is part of the Bipartisan Infrastructure Law which requires National Environmental Policy Act (NEPA) documentation. Oversaw the preparation of project initiation letters that were submitted by the City to FHWA, the lead Federal agency. Oversaw the preparation of a Categorical Exclusion (CE) template that included project information, project description, purpose and need statement, analysis of existing conditions, environmental impacts, and mitigation measures, and a permitting and regulatory overview. Overseeing the preparation Education B.S. Civil & Environmental Engineering, Ohio State University, 2000 Registrations Professional Engineer: Massachusetts (#48902) Rhode Island (#8435) Certifications 30-Hour Occupational Health & Safety Administration Associations Women’s Transportation Seminar Rhode Island, Past President, Northeast Region Council Chair and Member of the RIDEM/CRMC Committee Women’s Transportation Seminar Boston, Member Year Started with Bowman 2000 Year Started Professional Experience 2000 Angela Saunders, PE Project Role: Stormwater Management - Task Lead
Page 189
19 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Angela Saunders, PE Project Role: Stormwater Management - Task Lead of six CE’s and coordinated biological opinions for endangered species and written explanations on potential historic, cultural, and archaeological consequences. City of Providence, Woonasquatucket River Greenway | Providence, RI Lead permitting engineer. This project’s goal is to improve pedestrian and bicycle amenities along the Woonasquatucket River from Eagle Square to Francis Street in Providence. The project will also enhance the visitor experience providing pocket parks, kayak launch areas and public art to develop a sense of place along this one-mile corridor. Oversaw the drafting of the NEPA Categorical Exclusion checklist and responsible for coordination with permitting agencies including RIDEM and CRMC along with preparation of Category B Assent Application and Application for Water Quality Certificate. Stormwater Management Design & Permitting Experience Designed stormwater management systems, including closed drainage systems, for over 100 projects, including roadway reconstruction, stormwater separation, new sidewalks, parking lots, and bike paths. The designs were consistent with the MassDEP Stormwater Handbook or the Rhode Island Stormwater Design and Installation Standards Manual. Prepared, submitted, and coordinated various permits for work within environmental resource areas, including an Assent from Rhode Island Coastal Resources Management Council, Freshwater Wetland Permit from Rhode Island Department of Environmental Management, Notice of Intent from various Massachusetts communities and Massachusetts Department of Environmental Protection, Environmental Notification Form with Massachusetts Environmental Policy Act, Massachusetts Endangered Species Act Regulatory Reviews, and an Individual Permit from United States Army Corps of Engineers. Projects included: • Town of Walpole, Coney Street Improvement Project, Walpole, MA • Weymouth Signal & Roadway Design, Weymouth, MA • MassDOT, Hartford Turnpike (Route 20) at Grafton Street Intersection, Shrewsbury, MA • MassDOT, Jacksonville Street (Route 8A) over West Branch Brook, Heath, MA • MassDOT, Route 140 at Route A Intersection Improvements, Westminster, MA • Franklin Regional Transit Authority, Parking Lot Expansion, Greenfield, MA • Taunton Street Roadway Improvement Project, Wrentham, MA • 31 Bellows Road Parking Lot Expansion, Raynham, MA • Lake Avenue North Linear Park and Shared Use Path, Worcester, MA • Hartford Avenue North, High Street and Hopkinton Road Improvements, Upton, MA • Bay Street Sidewalk Project, Taunton, MA • Lakecrest Path, Crest Avenue, and Quarry Avenue Roadway Improvements, Weymouth, MA • Cochituate Rail Trail, Natick, MA • Citywide Drainage Improvements, Taunton, MA
Page 190
20 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Education B.S. Civil Engineering, Syracuse University, 2009 Registrations Professional Engineer: Rhode Island (#15570) Certifications OSHA 10-Hour Construction Certified Associations Professional Women in Construction, Member Year Started with Bowman 2019 Year Started Professional Experience 2009 Stephanie MacDonald, PE Project Role: Site & Stormwater Management Engineer Stephanie is a project manager with more than 17 years of experience in design, permitting, planning, analysis, review, and infrastructure improvements for municipalities, private clients and colleges. Her expertise includes stormwater collection, conveyance and treatment design, stormwater modeling, climate resilient planning, and green infrastructure implementation; local, state, and federal environmental permitting; site design and layout; public outreach and construction administration. Stephanie brings over 6 years of experience in Connecticut delivering technical designs for diverse site development projects, ensuring compliance with regulatory standards and client specifications. Experience Winstanley Enterprises LLC City Downtown Crossing Project (100 College Street)* | New Haven, CT Project engineer. Stephanie worked on the design of pedestrian access on plaza level and vehicular access for service tunnels for the implementation of a Transit- Oriented Development (TOD) plan that promoted safety and provided corridor mobility. Responsible for stormwater and sanitary sewer combined drainage system on plaza level and tunnel level, construction administration, traffic management, and coordination with subconsultants. Edgewater Hill* | Easthampton,CT & Evergreen Walk* | South Windsor, CT Project Engineer. These projects consisted of New Urbanist, mixed-use developments that combined commercial and residential components. Stephanie’s responsibilities included preparing site layouts, grading plans, drainage design, and stormwater management for preliminary submissions, ensuring that each design met functional needs and complied with all applicable local and state regulations. MassDOT McGrath Boulevard Construction | Somerville, MA & Cambridge, MA Project manager, stormwater lead and environmental permitting engineer. Working closely with the city and state departments on implementing stormwater control measures/green infrastructure for urban corridor, CSO separation, and drainage resiliency requirements. Part of Design team creating additional shared use walks and urban green space. Project management efforts include facilitating communication and coordination between state departments, municipal authorities, and multidisciplinary design teams to align objectives, resolve conflicts, and drive schedule adherence. Fort Avenue at Winter Island Road Intersection Improvements | Salem, MA Project manager, stormwater and environmental permitting lead. Responsible for maximizing greenspace within roadway right of way design of new stormwater drainage system and best management practice implementation performed drainage analysis, compensatory storage calculations, and hydrologic and hydraulic modeling. Notice of Intent permit application package and stormwater report provided onstreet parking and sidewalk continuity. *Project completed with a previous employer
Page 191
21 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Lincoln Street Alignment | West Bridgewater, MA Project manager, stormwater and environmental permitting lead. Responsible for design of new stormwater drainage system and water quality basin for roadway realignment, performed drainage analysis and hydrologic and hydraulic calculations. Prepared and presented a Notice of Intent permit application package and stormwater report. On-Call Professional Engineering Services | Springfield, MA Project manager. Our firm is providing professional engineering services on an as-needed basis to the Department of Public Works. Responsible for the design of stormwater systems, water quality improvements, erosion and sedimentation practices and utility layout. Responsible for environmental permitting submissions with local, state, and federal agencies. Provides project coordination and public outreach. On-Call Engineering Services | Westfield, MA Project manager. Our firm is providing professional engineering services on an as-needed basis. Responsible for the design of stormwater systems, water quality improvements, erosion and sedimentation practices and utility layout. Responsible for environmental permitting submissions with local, state, and federal agencies. Responsible for providing third party review services for stormwater management permits. Provides project coordination and public outreach. Intersection Improvements at Springdale Street, Papermill Street, and Union Street | Westfield, MA Senior project engineer. Our firm provided intersection improvements to improve vehicular operations involving traffic signal installation and roadway resurfacing at two Union Street intersections crossing Powdermill Brook and Pond Brook. Responsible for design of stormwater system and improvements, erosion and sedimentation controls, prepared and presented Notice of Intent permit application package and stormwater management report to City Conservation Commission, provided project coordination, and public outreach. Union Street at Springdale Road Intersection Improvements | Westfield, MA Senior project engineer. Responsible for design of stormwater system and improvements, erosion and sedimentation controls, prepared and presented Notice of Intent permit application package and stormwater management report to City Conservation Commission, provided project coordination, and public outreach. Town of Middleborough Downtown Improvements | Middleborough, MA Senior project engineer. Responsible for drainage and utility design and construction administration throughout project completion for the improvements to Center. Stephanie MacDonald, PE Project Role: Site & Stormwater Management Engineer
Page 192
22 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Antonia Thomas is a senior project engineer with more than seven years of experience. Antonia has been involved in a wide variety of transportation engineering projects. These projects have included unit cost estimating, plan layouts, stormwater management, traffic management plans, and construction phase services and field work. Experience Ferry Street Improvements | Easthampton, MA Staff engineer/construction inspector. This project involved roadway infrastructure and complete streets improvement project located on Ferry Street, Easthampton. Assisted with auto-turn edits and created six different views of autoturns in AutoCAD. Assisted with shop drawing reviews. Performed construction observations of the retaining walls being installed and documented the observations with pictures and field reports. B’2021 Roads Improvements | North Adams, MA Construction administration. Responsible for compiling bid documents and review of shop drawings. The project involved the rehabilitation design plans for sidewalks, curbing, ADA/MAAB access, road resurfacing, etc. with design, cost estimating, bidding, construction monitoring and coordination with the Office of Community Development. Coney Street Improvements | Walpole, MA Staff engineer. Assisted with construction services for this Coney Street Project. The construction services included construction monitoring, preparing detailed daily reports of construction activities, completing shop drawing reviews, responding to contractor requests for information (RFI) and/or coordinating responses with Town as appropriate, and attending construction meetings. The project included proposed roadway layout, sidewalk and curbing, pavement markings and signage, signalized intersection, and drainage improvements. The construction performed was based on the Construction Plan Set and the contract book. City Walk Bicycle and Pedestrian Improvement Project | Providence, RI Construction inspector. Responsible for performing construction observations weekly. During the observations, pictures were taken and reports were written to discuss what was completed on that day. Coordinated with the contractor and testing companies to collect samples of any materials brought on-site. Also responsible for coordinating with the contractor to discuss the construction schedule and weekly tasks to be completed. Completed pay requisition reviews. Edens Interstate 93 Frontage Road at Jan Karski Way | Boston, MA Staff engineer/construction inspector. Assisted with updating the bid package by preparing an OPCC, updating the special provisions, preparation of the bid form and construction bidding. Also assisted with all construction services within a nine-month Education B.S. Civil Engineering, University of Massachusetts - Dartmouth, 2018 Certifications OSHA 10 Certified Associations American Society of Civil Engineers, Member Women’s Society of Civil Engineers, Member Women’s Transportation Seminar (WTS-RI), Programs Committee, Member Year Started with Bowman 2018 Year Started Professional Services 2018 Antonia Thomas Project Role: Construction Adminstration - Task Lead
Page 193
23 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 period, attended all meetings with contractors, reviewed shop drawings, prepared punch list summaries and performed site visits to monitor construction. Supervised construction by completing many field reports and taking pictures. Attended the final inspection of the construction site. Town of Middleborough Downtown Improvements | Middleborough, MA Staff engineer. This project involved improvements to Center Street within the downtown Middleborough, including the modification of the Everett Square area, a six-way intersection with excess pavement, a lack of definition for the path of travel for the vehicles. Project improvements included the realignment of several project roadways to improve safety and usability for all modes of travel. Assisted with loop detector signal plan revisions. Responsible for multiple plan revisions, response to comments and estimate revisions. Completed field work for test pit monitoring on site. City of Central Falls Roadway Inventory | Central Falls, RI Staff engineer. Assisted with updating all existing roadway inventory with the use of Roadbotics, and Google Maps. Also assisted with the completion of the unit cost estimate. Completed cost estimates for complete streets and residential streets. A comprehensive video data collection on smartphones started the project. The data was analyzed at 10-foot increments by computer algorithms and machine learning to assess the roadway condition and the existing roadway to include the roadway condition and Complete Streets criteria, including crash data, radar speed studies, bicycle facilities, sidewalk quantity and quality, crosswalk facilities, curb ramps, public transit facilities, and travel lane widths. RIDOT Route 6/10 Interchange | Providence, RI Staff engineer. As part of a Design-Build team, our firm was responsible for the preparation of the Transportation Management Plans (TMPs) for demolition of U.S. Route 6 bridges. The TMPs included analysis to determine the optimal time and lane configuration for the bridge deck and beam demolition. Assisted with TMPs and provided an aerial to access detour options. North Agawam Infrastructure Planning | Agawam, MA Data coordinator & collector. Responsible for coordinating to finalize all maps for data collection and performing the field evaluations. In addition, analyzed and exported all compiled data. This project involved engineering services for a comprehensive assessment of the overall condition of infrastructure in the North Agawam neighborhood, including streets, sidewalks and curbing, stormwater systems, and other associated public works projects. Antonia Thomas Project Role: Construction Adminstration - Task Lead
Page 194
E Relevant Experience 03 SECTION
Page 195
25 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Description Bowman was retained as a subconsultant on an on-call basis to provide Traffic Engineering services. Bowman developed traffic signal design for the Route 53 (South Street)/Coal Pit Hill Road and Route 53 (South Street)/Town Hill Avenue intersections as part of a bigger project that is addressing drainage and stormwater management issues within the City of Danbury and increasing vehicular capacity at Coal Pit Hill Road intersection. As part of this design, Bowman updated the crash and traffic analyses provided by CTDOT, as well as determining appropriate signal phasing and timing and developing splits and offsets for the corridor, as these traffic signals will become part of an existing coordinated closed loop system in Danbury. Deliverables included traffic signal plans, pavement marking and signing plans, traffic signal estimates and specifications, and crash rates. Traffic Signal Design City of Danbury Danbury, CT Client Connecticut Department of Transportation (CTDOT) Firm’s Fee $69,000 Schedule 2017 Services Provided Field Reconnaissance Traffic & Safety Analysis Traffic Signal Design Pavement Markings & Signage
Page 196
26 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Description Bowman was retained as a subconsultant on an on-call basis to provide Traffic Engineering services to CTDOT. Bowman developed traffic signal design for the Route 4 (Derby Turnpike/Baldwin Road intersection in Orange, which has experienced an elevated incidence of high severity crashes. As part of this design, Bowman updated the crash analysis provided by CTDOT, as well determined appropriate signal phasing and timing, and developed splits and offsets for the corridor, as this traffic signal would become part of an existing coordinated closed loop system. Deliverables included traffic signal plans, pavement markings and signing plans, traffic signal estimates and specifications, and crash rates. Traffic Signal Design for Town of Orange Orange, CT Client Connecticut Department of Transportation (CTDOT) Firm’s Fee $60,000 Schedule 2018 Services Provided Field Reconnaissance Traffic & Safety Analysis Update to the Crash Analysis Traffic Signal Design Traffic Signal Plans Pavement Markings & Signing Traffic Signal Estimates
Page 197
27 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Description Our project team was retained by MassDOT through the Federal High Risk Rural Roads Program to improve safety at the intersection of Greenville Road (Route 31) and Turnpike Road in Ashby, MA. Following a Road Safety Audit and predictive safety analysis using the Highway Safety Manual and MassDOT’s SPICE tool, a single- lane roundabout was identified as the preferred alternative. Services included roadway, drainage, stormwater, lighting, signage, pavement marking, and right- of-way design, as well as local, state, and federal environmental permitting. During construction, our team provided shop drawing review, contractor support, traffic control and sequencing assistance, and construction phase services. The project also incorporated stormwater quality improvements, including upgraded catch basins and a bioretention basin, to meet Massachusetts Stormwater Standards to the maximum extent practicable. Greenville Rd. at Turnpike Rd. Intersection Improvements Ashby, MA Client Massachusetts Department of Transportation (MassDOT) Firm’s Fee $730,000 Schedule 2018 - 2024 Services Provided Safety Analysis Capacity Analysis Alternatives Analysis Concept Design Roundabout Design Stormwater Management Design
Page 198
28 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Description Bowman assisted the Town of Montague in the design and implementation of pedestrian accessibility improvements as part of the Town of Montague’s Complete Streets Program. The project focused on enhancing pedestrian safety and connectivity along Keith Street, Montague Street, and Turnpike Road by providing new sidewalk infrastructure and accessible routes that improve connections to nearby schools, neighborhoods, and community destinations. Services included corridor evaluation, sidewalk and curb design, ADA and MAAB- compliant pedestrian accommodations, preparation of construction documents, opinion of probable construction costs, bidding assistance, and construction phase services. The project required close coordination with the Town Planner, Department of Public Works, and other municipal stakeholders to develop practical, context- sensitive improvements that enhance walkability, improve accessibility, and support the Town’s long-term transportation and safety goals. Client Town of Montague, MA Firm’s Fee $86,450 Schedule September 2025 - In Construction Services Provided Transportation Engineering Roadway Design Surveying Landscape Architecture Construction Plans & Contract Documents Bidding Services Construction Administration Town of Montague Complete Streets Montague, MA
Page 199
29 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Description Our project team was retained by the City of Westfield to design intersection and roadway improvements on Union Street at the intersection of Springdale Road and Papermill Road and prepare construction plans and contract documents for bidding. The project design consisted of roadway realignment, traffic signal installation, roadway widening, drainage improvements, site access improvements for abutters, retaining wall design, pavement resurfacing and landscape enhancements. The project was subject to the MA Wetlands Protection Act and Westfield Wetlands Protection Ordinance as it is situated between two brooks and adjacent to a groundwater well. An Order of Conditions was obtained from the local Conservation Commission for the roadway construction, including widening and drainage modifications within the wetland resource areas. Client City of Westfield, MA Cost $483,242 Schedule 2018 - 2020 Services Provided Roadway Design Traffic Signal Design Signals & ITS Traffic & Parking Highways, Streets & Structures Environmental Permitting Construction Plans & Contract Documents Construction Bidding Services Construction Administration Services Intersection Improvements at Springdale Road Westfield, MA
Page 200
30 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Description Our project team is providing transportation engineering design services for the intersection improvements at Fort Avenue and Winter Island Road, Columbus Square, Columbus Avenue and Memorial Drive in Salem. The proposed intersection improvements are based on the “Multi-Use Path & Intersection Realignment” concept plan, dated December 28, 2020, which was prepared by our firm as part of the Salem Willows Park Transportation Plan. Services we provided included conceptual design, preliminary design, final design, meetings/coordination and public engagement. Our scope of work includes: • Developing design plans to accommodate multi-use/pedestrian crossings of Fort Avenue in the vicinity of Winter Island Road, Columbus Square, Columbus Avenue and Memorial Drive. • Evaluating if one or more crossings of Fort Avenue should be provided. Locations presumed to be: a multi-use path crossing Fort Avenue, west of Winter Island Road to facilitate access to and from the proposed separated bicycle facility, and a pedestrian crossing with the associated curb extension and pedestrian ramp infrastructure at the intersection of Fort Avenue and Columbus Avenue. • Providing geometric roadway improvements to promote traffic calming at the following intersections: Fort Avenue at Columbus Avenue/Memorial Drive, Fort Avenue at Columbus Avenue/Columbus Square and Fort Avenue at Winter Island Road. Client City of Salem, MA Cost $250,000 Schedule 2021 - 2024 Services Provided Transportation Engineering Fort Avenue at Winter Island Road Intersection Salem, MA
Page 201
31 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Redevelopment of Donna Blake Park Springfield, MA Description Donna Blake Park is a 1.7-acre neighborhood park in Springfield located in the Upper Hill Area. The City selected Bowman to provide comprehensive design and construction administration services for the park’s redevelopment through the state’s Parkland Acquisitions and Renovations for Communities (PARC) grant program. Our team enhanced pedestrian access and universal accessibility throughout the park, transforming the aging urban green space into an inclusive and vibrant recreational destination. Bowman’s design features a new splash pad, an accessible playground with rubberized surfacing, and a large pavilion. Additional improvements include ADA-compliant walkways, accessible picnic tables, park signage, upgraded site furnishings and landscaping and drainage enhancements. Bowman led the planning, landscape architectural design and civil engineering services from schematic design through construction documentation. Close coordination with City officials, community stakeholders and the general public helped ensure the design met local needs and complied with grant requirements. Construction was completed in July 2024, and the revitalized park now offers an inviting and accessible community hub that supports recreational equity and neighborhood connection. Client City of Springfield Cost $75,755 Schedule 2023 - 2024 Services Provided Landscape Architecture Civil Engineering Planning & Design
Page 202
32 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Dwight Street Roadway Improvements Springfield, MA Description This project focused on the analysis and design of retrofit curb extensions, traffic signals, and pedestrian safety enhancements along Dwight Street. Key efforts included performing detailed traffic flow analyses, assessing interaction points for pedestrians, vehicles, bicycles, and transit and designing solutions to improve overall safety and operational efficiency in the heart of downtown Springfield. Comprehensive site inspections were conducted to evaluate existing conditions, and coordination with local authorities ensured compliance with city and state regulations. The project aimed to enhance traffic management, reduce congestion, and provide safer pedestrian crossings, aligning with the Springfield Department of Public Works’ standards for urban roadway improvements. Pedestrian improvements included designing bump outs, transit stops, and ADA compliant ramps. Client City of Springfield, MA Cost $270,000 Schedule 2023 - 2024 Services Provided Design of Roadway, intersection Improvements & Stormwater Safety & Traffic Analysis Concept Design Construction Plans & CD’s Construction Administration
Page 203
33 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Description Bowman was retained by the City of Easthampton, using a MassWorks funding grant, to design intersection and roadway improvements on Ferry Street and prepare construction plans and contract documents for bidding. The primary goal of the project was to improve a roadway section of Ferry Street and intersection improvements to Lovefield Street/Pleasant Street with the construction of a mini roundabout. The project area includes pedestrian, bicycle, and parking improvements through the use of a shared-use path, pedestrian crossings and new parking areas. The design improved the connection to the existing City Rail Trail and created an extension through the project area. The drainage system was upgraded, lighting added, utilities were improved and landscape and streetscape enhancements beautified the area. Watermain improvements were included within the project area to accommodate the private redevelopment at One Ferry Street and the city’s aging infrastructure. We obtained a local stormwater management permit for additional structures and piping to the existing stormwater systems, an order of conditions due to work within wetland resource area and buffer of adjacent pond and a dam safety permit due to part of Ferry Street was also part of Lower Mill Pond Dam. Working together with the city and the Office of Dam Safety to satisfy their individual requirements, the following modifications were implemented; minimized penetrations within roadway/ dam, detailed specifications for backfill material used within roadway for trenches, and developed additional construction sequencing plans and specifications for embankment stabilization. Client City of Easthampton, MA Cost $489,900 Schedule 2019 - 2020 Services Provided Roadway & Pavement Design Parking Layout Shared-Use Path Design Street Lighting Drainage & Stormwater Improvements Utility Design Environmental Permitting Construction Administration Services City of Easthampton Ferry Street Improvements Easthampton, MA
Page 204
34 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Client Town of Middleborough, MA Schedule Construction completed 2022 Services Provided Transportation Engineering Construction Administration Description The team completed traffic counts, assessed signal warrant criteria, developed design plans for intersection layout, pavement design and resurfacing, drainage and watermain replacement, and construction documents for the proposed intersection improvements at two locations along Center Street. The first location, John Glass, Jr. Square, is the junction of Center Street, Everett Street, High Street, Station Street, and Center Avenue, and the second location is the intersection of Center Street and Oak Street. The project was designed in accordance with MassDOT, AASHTO and MUTCD standards, to improve the horizontal and vertical geometric layout at the intersections, modify curb and sidewalk extensions to more clearly define the limits of parking, the path of each approach leg and the intended refuge for pedestrians and redesign 14 sidewalk curb ramps to meet requirements of ADA and AAB. Due to the relatively narrow right-of-way and the proximity of existing buildings to the roadway edge, design exceptions for bicycle accommodation were required and prepared. Utility design included over 1,700 LF of watermain replacement and over 800 LF of two new drainage systems. Additional upgrades to the existing storm sewer systems and utility infrastructure were designed, and coordinated with MassDOT District 5 and the Town of Middleborough. In addition to preparation of the construction plans and documents, the team provided construction bidding services and is currently providing construction administrative services. Middleborough Downtown Improvements Middleborough, MA
Page 205
35 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Description Our firm provides professional engineering services on an as-needed basis to the Department of Public Works, focusing on transportation planning, traffic engineering, and landscape architectural services for the West Street Corridor improvements. Phase 1 included community engagement and proposed solutions to improve safety, enhance pedestrian travel, and support PVTA bus transit. Key tasks included analyzing existing conditions, evaluating potential corridor treatments, conducting traffic analysis, and developing conceptual designs. Phase 2, currently underway, involves advancing conceptual plans into a final design submission for the MassWorks Application Plan Set. This phase includes traffic data collection and analysis, preliminary design, traffic signal and street light design, traffic management plans, detailed design plans, special provisions, and construction cost estimates. Client City of Springfield, MA Firm’s Fee $300,000 Schedule 2022 - Ongoing Services Provided Existing Conditions Analysis Traffic Analysis Traffic Signal Design Traffic Management Plans Transportation Planning Traffic Engineering Roadway Design Plans Landscape Architecture Community Engagement On-Call Engineering Services, West St. Corridor Task Springfield, MA
Page 206
36 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Filley Park Improvements Bloomfield, CT Provided landscape architecture and design services for improvements at Filley Park in Bloomfield, Connecticut, focused on enhancing recreation, accessibility, and the overall visitor experience while preserving the park’s character. Services included conceptual and detailed landscape design, planting plans, grading and ADA accessibility, site furnishing and material selection, and coordination with the multidisciplinary design team. Improvements featured an enhanced streetscape, natural playground, educational nature trails, ice skating and fishing amenities, a picnic pavilion, outdoor fireplace, and the transformation of the park’s island into an arboretum and event space. Previous Employer Experience Pope Francis Preparatory School Springfield, MA This project consisted site master planning and design development of traffic and pedestrian control solutions, handicap accessibility applications, design and construction of tennis courts, baseball and softball fields, a practice field, and a synthetic turf multi-sport field with track and press box/bleacher system. The site also included separate pick up and drop off areas for parents and buses and a large parking area and bio-retention system. Responsibilities included master planning and graphic design, design development documentation, construction documentation and construction inspection services. Berkshire Community College Athletic Field Pittsfield, MA Development of a multi-sport synthetic turf field (Gene Dellea Community Turf Field). The project included the complete replacement of the existing natural grass field with a synthetic turf system designed to accommodate multiple sports while significantly increasing field availability and reducing long-term maintenance requirements. Supporting improvements included new athletic amenities, ADA accessible press box and bleacher system built into existing slope, accessible pedestrian circulation, and sports lighting. A key component of the project was the integration of sustainable site design and stormwater management practices. Working collaboratively with civil and environmental engineers, the site was designed to effectively collect, convey, and treat stormwater runoff while protecting adjacent wetlands and sensitive environmental resources. Jon Allard, RLA | Landscape Architect Task Lead Jon Allard began his career in Connecticut, spending the first seven years working out of Manchester, where he gained extensive experience across a wide range of roadway, site development, state, municipal, and private projects. This early work provided Jon with a strong foundation in multidisciplinary project delivery and fostered a deep understanding of Connecticut’s local conditions and state and municipal standards. Below are a few similar projects that Jon completed with a previous employer that are relevant to the Town of Granby’s Professional Engineering request
Page 207
37 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Central High School Athletic Fields Springfield, MA This project inlcuded the planning and design of a comprehensive athletic field modernization project at Central High School in Springfield MA. The project replaced the existing natural grass baseball field with a state-of-the-art synthetic turf baseball field while also converting an existing natural turf practice field into a versatile synthetic turf multi-sport field designed to accommodate football, soccer, lacrosse, softball, and other school and community athletic programs. Supporting improvements included the construction of a new ADA accessible press box, bleachers, walkway enhancements and installation of sports field lighting. Previous Employer Experience Morrill Science Center Amherst, MA This project consisted of the design and development of the Morrill Science Center corridor project at the University of Massachusetts Amherst. The project included landscape design improvements that promoted sustainability and accessibility, featuring updated pedestrian pathways, accessible entrances, and integrated stormwater management systems to reduce runoff and enhance site resilience. Graphic materials were developed to engage stakeholders and guide the project through design phases. The project focused on accessibility, stormwater improvements, safety and landscape aesthetics throughout the corridor. Mechanic Street Stormwater Improvements Spencer, MA This project consisted the design and implementation of a sustainable streetscape and parking lot featuring green stormwater infrastructure. The project incorporated bioretention rain gardens, underground infiltration systems, and other stormwater practices to reduce runoff, improve water quality, and enhance the downtown streetscape. Improvements also transformed an underutilized parking area into an attractive public space with educational signage highlighting sustainable stormwater management. Jon Allard, RLA | Landscape Architect Task Lead
Page 208
38 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 SITE CONSIDERATIONS 03 Plan Considerations and Phasing Community Park South Princeton, NJ Bowman and our teaming partner Mahan Rykiel are developing a comprehensive master plan for a 20-acre public park in Princeton, New Jersey, designed to reflect the community’s vision and evolving recreational needs. The planning process emphasizes inclusive, transparent stakeholder and public engagement to ensure that residents, local officials and interest groups have a meaningful voice in shaping priorities and amenities. Through a series of ongoing workshops, surveys and public meetings, the team is gathering input to guide the park’s design and functionality. Additional Recreational Field Design Projects Branch Brook Park & Yanticaw Park Newark & Nutley, NJ Bowman secured the contract for the redesign of two baseball fields at Branch Brook Park and one softball field at Yanticaw Park. The two fields at Branch Brook park were existing natural turf fields and were to be converted to synthetic turf. Improvements included synthetic turf, stormwater system, sports field fencing and players seating, sports lighting, drinking fountain, bleachers, scoreboard and hardscape improvements. The softball field at Yanticaw park was an existing synthetic turf field with an all clay infield. Our task was to replace the clay infield with synthetic turf. Kushner Academy Fields Township of Livingston, Essex County, NJ Bowman provided civil engineering, landscape architecture and surveying services to the Joseph Kushner Hebrew Academy, a K-12 facility, for the redesign of their recreational fields and playground areas. The school also serves as the location of a summer camp program. Improvements consisted of a synthetic turf soccer field, three basketball courts, swimming pools, a natural grass baseball field and a camping area with cabins for the students. Other site improvements include parking lot modifications, landscaping and a proposed stormwater management system to collect and control the stormwater runoff. Oak Knoll School Athletic Fields Chatham, NJ Bowman provided professional surveying, engineering, planning and landscape architectural services for the design of this state of the art athletic campus on 13-acres within Chatham, NJ. The project consisted of the design and implementation of two soccer fields, a clay infield softball field and a two-story athletic building. The athletic fields were specifically designed with turf and under drains to allow for fast dry times during rainfall events and a “fertigation” system which both irrigates as well as fertilizes at the same time through the irrigation system.
Page 209
E References 04 SECTION
Page 210
40 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 References City of Easthampton Greg Nuttelman DPW Director 50 Payson Avenue Easthampton, MA 01027 413.529.1400 dpw@easthamptonma.gov Town of Walpole Carl Balduf, PE, PLS Town Engineer 135 School Street Walpole, MA 02081 508.660.7213 cbalduf@walpole-ma.gov Town of Middleborough Christopher Peck Director of Public Works 48 Wareham Street Middleborough, MA 02346 508.946.2481 cpeck@middleborough.com City of Lowell Sarah Brown Chief Design Planner Department of Planning and Development 50 Arcand Drive Lowell, MA 01852 978.674.1446 sbrown@lowellma.gov City of Westfield Randy Brown Director City of Westfield 28 Sackett Street Westfield, MA 01085 413.564.3126 randy.brown@cityofwestfield.org Town of Russell John Hoppe Highway Foreman Town of Russell Highway Department 162 Main Street Russell MA 01071 413.862.6222 jhoppe@townofrussell.us City of Springfield - DPBRM Laura A. Walsh Senior Parks Project Manager 200 Trafton Rd. Springfield, MA 01108 413.886.5186 lwalsh@springfieldcityhall.com City of Springfield Andrew J. Krar, PE City Engineer 70 Tapley St. Springfield, MA 01104 413.784.4884 MassDOT Jonathan Freeman Project Manager MassDOT 10 Park Plaza, Boston MA 02116 857.368.4636 jonathan.e.freeman@dot.state.ma.us City of Salem David Kucharsky Transportation Director 98 Washington Street, 2nd Floor Salem, MA 01970 978.619.5697 dkucharsky@salem.com Town of Montague Chris Nolan-Zeller Assistant Town Administrator Town of Montague 1 Avenue A Turners Falls, MA 01376 413.863.3200 x109 chrisn@montague-ma.gov
Page 211
E Project Approach & Understanding 05 SECTION
Page 212
42 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 As the RFP/Q states, the Town of Granby is seeking to engage one or more multidisciplined engineering firms for a variety of services on an as-needed basis to assist on various public infrastructure projects. Projects could include the planning, design and construction of a replacement athletic/running track and baseball and softball fields at the high school / middle school complex, the construction of a year-round bathroom and pickleball courts at Salmon Brook Park, administration of a sewer pump maintenance project and various other engineering tasks. Consultants(s) may be asked to complete projects, which require special expertise on a variety of services. We are fully equipped to provide the Town of Granby with comprehensive engineering design and consulting services. Our experience and technical capabilities make us a reliable partner in maintaining the quality and integrity of Granby’s development projects. Responsiveness and Flexibility for On-Call Assignments Bowman’s staff is well situated to allow us to respond immediately to each assignment, and to adjust staffing to allow us to address unforeseen issues and delays quickly to keep the project moving. Our success and responsiveness to the Town is reflective of our ability to anticipate, coordinate, and where possible, control the effects of variables, such as design coordination, public engagement, cost information, changes in scope, and numerous other factors. We recognize that the planning, budgeting, scheduling, and progress monitoring functions of our team are critical for the success of a project. Based on our past experiences working with similarly sized municipalities, we understand time is of the essence for on-call services with requests being initiated by the community and elected officials. The cornerstone of a successful on-call civil engineering project is communication between the Town and the consultant team. Bowman strives to provide ample communication to keep the Town apprised of each projects’ progress along with project developments and opportunities. Project Understanding For this current On-Call Engineering Services, Bowman has the in-house expertise to readily assist the Town for the following areas of expertise: • Consultation and Advice • Feasibility Studies • Field Investigation and Engineering Data Collection • Engineering Reports • Construction Cost Estimating • Engineering Design Services • Municipal Park Planning and Design • Land Surveying • Landscape Architecture • Construction Management and Inspection • Value Engineering • Definitive Plan and Subdivision Experience • Expert Testimony • State and Federal Permitting Experience • State and Federal Funding Assistance • Environmental Permitting • Geographic Information Systems • Highway and Street Engineering • Pavement Management • Traffic Engineering
Page 213
43 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Bowman’s managerial approach is based upon our successful experience leading and participating in numerous project- order contracts for state DOT’s; and on-call contracts with municipalities, such as Springfield, Westfield, and Salem Massachusetts. We know that the key to successful project order assignments under this contract will be to respond quickly and develop a clear understanding of the task at hand, assign the right people to the job, and provide coordination and communication with Granby town staff, and community stakeholders as needed for the assignment. By assembling the right team, we can easily meet the needs of a task assignment. Our approach will ensure that the Bowman team will satisfactorily meet the City’s administrative and technical standards, while managing and designing multiple and varied assignments. We also understand that assignments under this on-call contract could have varied duration periods. These could range from a few days to others that may be multi-year assignments. Bowman’s approach is that no task is too small or too large and we will use our experience, expertise, and responsiveness on assignments requested by the Town. On-Call Project Order Contract Experience Bowman is confident in our team’s ability to assist the City with project order assignments on time and within budget. Our Project Manager, Paul Furgal, PE, PTOE will be responsible for monitoring the financial and work progress status of each project order assignment. He will ensure that the Bowman team is committed to providing the necessary resources to meet established milestones. He will be supported by Jon Allard, RLA as Deputy Project Manager. Jon has extensive experience in municipal park design and various public and private design projects. Along with our project summaries, we have included a project experience sheet detailing various projects that Jon has designed and managed that we feel are representative of the type of projects that have been identified in the ‘description of services’ section of the RFP. Project Management and Project Controls Bowman’s project management approach is tailored to providing a quality product on time and on budget. A key to achieving that outcome is clear understanding and communication of project scope, deliverables, schedule and budget. To that end, Bowman will develop a Project Management Plan that defines the project scope, team organization and responsibilities, project approach and key issues, project schedule and major milestones. For the project milestones, deliverables will be will identified. The submission and review time of the project deliverables will be reflected in the project schedule. A kick-off meeting will be held for the consultant team members to provide an understanding of project requirements. On-going coordination and communication with the Town of Granby’s Project Manager and other key staff are also important to advance the assignments. Regularly scheduled meetings to provide project updates and resolve issues will be held. Working with the Town of Granby, we will also establish a meeting schedule with stakeholders for assignments as needed. As the Bowman team has done on other on-call contracts, each individual on-call assignment will be managed as a separate project, including a separate communication, analysis, permitting and design files. At each step of analysis and design, Bowman will conduct quality assurance and quality control. This approach will facilitate our end goal, to provide a quality product on time and on schedule for the Town of Granby. Project Approach
Page 214
E Fee Schedule 06 SECTION
Page 215
45 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 Page 7 of 7 APPENDIX A Cost Proposal Name of Engineering Firm: ___________________________________________________ Services Needed On-Call Engineering and Related Services Please indicate your firm’s hourly fees over the five-year period of the contract Billing Category Hourly Billing Rate Project Manager ________________ Chief Engineer ________________ Engineer ________________ Technician Support ________________ Clerical/Researcher ________________ Other ________________ Other Expenses (if applicable): Identify any other categories and costs required to provide Engineering and On-Call services that are not included above: ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ Bowman Consulting Group Ltd. $225 $190-215 $190 $100-155 $95 Labor rates, subconsultant costs, equipment expenses, and other direct costs may change over time due to market conditions and inflation. Accordingly, the hourly billing rates provided are based on current rates and may be adjusted periodically during the contract term in accordance with the terms of the agreement and with the Town’s review and approval. Any extraordinary services or specialized subconsultant services requested outside the scope of the on-call agreement would be discussed with and authorized by the Town prior to incurring such costs. Please see Bowman’s current billing rates on the next page. *See rates on next page
Page 216
46 Bowman | Town of Granby Professional Engineering Services | July 24, 2026 BOWMAN CONSULTING GROUP LTD. SCHEDULE B –MUNICIPAL HOURLY RATES January 2026 CLASSIFICATION HOURLY RATES Principal $225.00/HR Department Executive $225.00/HR Team Leader $225.00/HR Senior Project Manager $215.00/HR Project Manager II $215.00/HR Project Manager $190.00/HR Assistant Project Manager $175.00/HR Project Coordinator $145.00/HR Senior Surveyor $205.00/HR Engineer I | Engineer II | Engineer III |Engineer IV $125.00/HR | $150.00/HR | $160.00/HR | $190.00/HR Planner I | Planner II | Planner III $120.00/HR | $145.00/HR | $155.00HR Designer I | Designer II | Designer III $105.00/HR | $110.00/HR | $115.00/HR CAD Drafter I | CAD Drafter II $100.00/HR | $105.00/HR Senior Construction Inspector $145.00/HR Construction Manager $185.00/HR Construction Inspector $130.00/HR Senior Construction Technician $170.00/HR Technical Lead $205.00/HR Traffic Technician $110.00/HR Traffic Counter $ 70.00/HR Survey Technician I | Survey Technician II | Survey Technician III $100.00/HR | $110.00/HR | $155.00/HR Survey Field Crew - 1 Person $140.00/HR Survey Field Party $100.00/HR UAV Operation $110.00/HR Office Manager $105.00/HR Adm Professional $ 95.00/HR ECT Hourly Municipal Rate Table 2026 –SEPA/NJ Initials: Bowman / Client Hourly Rates
Page 217
Page 218
PROPOSAL / JULY 24, 2026 Professional Engineering Services Town of Granby, CT
Page 219
www.bscgroup.com CORE SERVICES Engineering Planning & Design Ecological Science & Permitting Land Survey GIS & Software Solutions AT A glance OFFICE LOCATIONS HEADQUARTERS Boston, MA Andover, MA Hyannis, MA Worcester, MA Glastonbury, CT Manchester, NH 1965 210 BSC FOUNDED TEAM MEMBERS
Page 220
Dear Mr. Walsh: The Town of Granby is advancing a range of important municipal and capital improvements for the community, including upgrades to the high school/middle school athletic complex, new restroom and pickleball facilities at Salmon Brook Park, and sewer pump maintenance and administration. These priorities are taking shape at a time when each capital investment must be practical, durable, and financially defensible. For this five-year task-order contract, the Town needs a responsive engineering partner who can define scopes, evaluate alternatives, establish realistic budgets and phasing, and guide authorized projects from planning through construction. BSC Group, Inc.’s (BSC) multidisciplinary team is well positioned to help Granby deliver durable, maintainable, and community-supported projects that protect public investment, improve infrastructure reliability and recreation assets, and preserve the Town’s natural resources and character. BSC provides expert, in-house capabilities in civil and transportation engineering, landscape architecture, environmental permitting, and construction engineering and administration, with specialized expertise in athletic field design, utility engineering, and stormwater management and drainage solutions. We offer the following advantages: Established Experience Supporting the Town of Granby BSC already supports the Town of Granby through a current on-call surveying contract led by Michael Healey, PLS, providing our team with familiarity with the Town’s staff, procedures, municipal assets, and project expectations. Assignments have included the Evangeline Place Topographic Survey and, notably, survey services at Salmon Brook Park, giving BSC direct knowledge of the site’s existing conditions that can inform the proposed year-round restroom, pickleball courts, and future park improvements. This established local and site-specific experience will support efficient coordination and cohesive project delivery. Long-Standing On-Call Engineering Capabilities BSC has established strong protocols and procedures for the timely completion of on-call assignments. These procedures are grounded in more than six decades of experience supporting municipalities and state agencies across Connecticut. BSC currently provides on-call engineering services to the cities of Hartford, New Britain, and Waterbury, as well as the towns of East Hartford, Simsbury, Waterford, and Windsor. At the state level, BSC has supported agencies including the Connecticut Department of Transportation, Connecticut Department of Energy and Environmental Protection, Connecticut Department of Construction Services, and the University of Connecticut. BSC’s Connecticut-based team has the staffing depth, on-call experience, and established management protocols to mobilize promptly, support concurrent assignments, and complete authorized services within the Town’s required timeframes. JULY 24, 2026 Mike Walsh Town Manager Town of Granby 15 North Granby Road Granby, CT 06035 180 Glastonbury Boulevard, Suite 305 / Glastonbury, CT 06033 / 860-652-8227 Engineers Environmental Scientists Software Developers Landscape Architects Planners Surveyors www.bscgroup.com
Page 221
Proven Experience Delivering High-Performance Athletic Facilities BSC has delivered this exact type of work for Connecticut schools and municipalities. In Bloomfield, CT, BSC provided design, engineering, bidding assistance, and construction administration for the conversion of the high school stadium from natural grass to synthetic turf, along with track and event-area renovations. In Plainville, CT, we designed two new multi-sport, all-weather synthetic turf fields, renovated the track and field-event areas, and supported the project through bidding and construction. Our work at Norwalk High School addressed especially challenging subsurface conditions, with BSC coordinating alongside the geotechnical engineer, landscape architect, and architect to incorporate rammed aggregate piers beneath a new track and synthetic turf field. Athletic facility improvements in Avon and Southington, CT, included synthetic turf conversion, track rehabilitation, field-event upgrades, cost estimating, and public coordination. For the City of Milford, CT, BSC designed and administered renovations to baseball and softball facilities that included synthetic turf, fencing, dugouts, batting cages, and site electrical upgrades. Together, these projects reflect the same blend of field programming, grading, drainage, permitting, cost control, bid support, and construction-phase services that Granby is seeking for its athletic complex improvements. Trusted Leadership with a Proven Track Record Serving as principal-in-charge and project manager will be Robert Newton, PE, LEED AP, a professional engineer with more than 32 years of experience. Rob has overseen a diverse portfolio of projects focused on on-call engineering services, including athletic field and track improvements, site and roadway design, stormwater management and drainage, utility and sewer system improvements, permitting, and construction administration. Many of these initiatives were completed under on-call contracts and delivered promptly in response to client needs while supporting economic development. Also critical to his success is his experience providing on-call consulting services to municipalities throughout Connecticut and western Massachusetts, serving as a trusted advisor to help clients plan and prioritize community improvements while making the best use of public funds. We appreciate the opportunity to submit our qualifications and look forward to the possibility of expanding our support for the Town of Granby. Please contact me at 860-652-8227 or rnewton@bscgroup.com if you have any questions about our proposal or would like to schedule an interview. Sincerely, BSC Group Robert Newton, PE, LEED AP Vice President 180 Glastonbury Boulevard, Suite 305 / Glastonbury, CT 06033 / 860-652-8227
Page 222
Table of Contents 01. Narrative ........................................................................................................................................1 02. Anticipated Town Support ........................................................................................41 03. Cost Proposal ........................................................................................................................43 ON-CALL SURVEYING, GRANBY, CT BSC’s ongoing surveying contract with Granby provides established familiarity with the Town’s staff, procedures, assets, and project expectations.
Page 223
BLOOMFIELD HIGH SCHOOL ATHLETIC FACILITY, BLOOMFIELD, CT BSC delivered comprehensive design and construction-phase services for Bloomfield High School’s synthetic turf field and renovated running track, including major drainage improvements engineered to withstand extreme rainfall.
Page 224
APPROACH & UNDERSTANDING BSC’s integrated, multidisciplinary project approach allows us to apply expertise across disciplines to see a project from every side and solve complex planning and design challenges. Effective Protocols for On-Call Service Delivery The successful delivery of on-call design and survey services is dependent upon the consultant’s ability to respond to a variety of project types with qualified personnel. Furthermore, these assignments require effective project management techniques to assure the availability of appropriate staff, effective communication, as well as the quality of the final deliverables, often upon short notice, and in many cases on simultaneous projects. BSC offers critical experience fulfilling these criteria for on-call contracts for public clients at the municipal and state levels. Within the state of Connecticut, we have provided as-needed design and survey services to such agencies and communities as the Town of East Hartford, Town of Simsbury, Town of Windsor, City of Waterbury, City of Hartford, the University of Connecticut, the Connecticut Department of Administrative Services, the Connecticut Department of Energy & Environmental Protection, and the Connecticut Department of Economic Development. As a result of this past experience, we have developed proven techniques to assure rapid response and timely delivery of task assignments. This is achieved through the employment of three critical elements: Depth of resources to provide on-call services Efficient management approach for rapid response Commitment to maintaining budget and schedule Depth of Resources The depth of our resources further contributes to the cost-effective implementation of each task. Our team is comprised of individuals with diverse professional experience. As a result, we can assign tasks to the most appropriate qualified individuals, assuring the Town of Granby the cost-efficient implementation of projects. Narrative NARRATIvE / 1
Page 225
Commitment to Maintaining Budget and Schedule Essential to our management approach is our commitment to maintaining budget and schedule, while assuring the quality of our deliverables. These elements of our management approach are discussed next. Status Report. BSC will prepare reports for the Town of Granby Public Works Department at the completion of critical steps during a project’s schedule. A project management report will be submitted outlining the completed activities, and any variance to the original project plan. Project Coordination. BSC will coordinate activities with Town of Granby staff, and if needed, contractors, utility companies, and others to ensure conformance to the project schedule. BSC will also be prepared to meet with town staff to discuss scheduling and other requirements as needed for each task assignment. Record Keeping. BSC will submit copies of all project correspondence to the Granby Public Works Department. Upon the completion of a project task, we will provide Granby with all design files, calculations, and supporting design pertinent to the project. Efficient Management Approach for Rapid Response Project manager Robert Newton, PE, will work hand-in-hand with the town throughout the assignment of task orders, negotiation of schedule and cost, and editing of final deliverables. Rob will ensure that the town is continuously appraised of project status and that town standards are rigorously applied to meet project needs. BSC’s project manager will prepare a projected work schedule and a detailed level of effort tailored to meet the needs of the particular task and the town’s goal in implementing the project. For more complex assignments, we will meet with the town’s project manager to determine the appropriateness of the submitted schedule and coordinate necessary tasks. At times, we may recommend cost- saving measures or other techniques that we may identify as being beneficial to the town. Following the town’s notice to proceed, our appropriately selected staff will immediately begin the design effort. Resulting documents will undergo a comprehensive QA/QC process with plans reviewed and stamped by the project manager. Deliverables will then be submitted to the town for comment and revision, as necessary. Salmon Brook Park, Granby, CT As part of BSC’s on-call surveying contract with Granby, our work at Salmon Brook Park provides firsthand site knowledge to inform proposed improvements and support cohesive project delivery. 2 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP
Page 226
Streamlined Approach Controls Schedule and Budget. Our proven procedures for on-call consulting contracts have built-in controls to maintain cost and schedule commitments. The key to meeting budget and schedule requirements is the careful preparation of initial estimates at the outset of the task order. BSC’s project manager will determine a realistic budget and schedule for each assignment. This will be carefully prepared with consideration of the complexity of necessary research and estimated man-hours necessary to complete the task. The thoughtful preparation of initial estimates results in project delivery within cost and time parameters, which are regularly monitored using BSC’s real-time accounting software. Communication. Finally, regular communication with town staff helps to maintain schedule and budget, while assuring that project deliverables meet the town’s objectives. Project manager, Rob Newton, will communicate with the town regularly to document our progress with current task orders. This regular personal contact will keep the town apprised of our work, while ensuring that our project manager is mindful of the town’s goals, priorities, and preferences. Proven Approach to Athletic Facility Design and Delivery BSC approaches every athletic facility project with a clear understanding that these spaces are daily assets for students, coaches, families, and the broader community. That means reconstructing athletic fields and a track that not only perform well on game day, but also address the underlying grading, drainage, stormwater, and site challenges necessary to support long-term durability, safety, and ease of maintenance. We pride ourselves on: Clear, coordinated design from site investigation through construction administration. Athletic facility expertise that supports field performance, safety, and user experience. Practical solutions for grading, drainage, and stormwater management. Responsive communication with town staff, school representatives, and project stakeholders. Cost-conscious design that supports bidding, construction, and long-term maintenance. A strong understanding of local and state permitting and public-sector project delivery. BSC’s approach is both strategic and grounded in real-world implementation. We combine technical strength with a collaborative, client- focused mindset, helping the Town of Granby advance reconstruction of the track, baseball field, and softball field from concept through construction with confidence. BSC has supported the Town of Windsor, CT, through responsive on-call engineering services for development reviews, infrastructure improvements, permitting, and construction oversight, as well as the design of Wilson Gateway Park. Wilson Gateway Park, Windsor, CT NARRATIvE / 3
Page 227
Extensive Experience in Athletic Facility Design BSC is well-versed in supporting municipalities, school districts, and institutional clients with the planning, design, and implementation of athletic facility improvements. Our work includes synthetic turf and natural grass field design, track and field-event upgrades, drainage and stormwater improvements, site utilities, sports lighting, accessibility enhancements, circulation and parking improvements, and support amenities such as bleachers, press boxes, concessions, and storage facilities. Across Connecticut, we have helped communities modernize athletic venues and create safer, higher-performing facilities that better serve students, athletes, and spectators. Integrated Design for High-Performing Facilities Athletic field projects demand careful coordination of grading, drainage, soils, permitting, site access, utilities, and long-term maintenance considerations. BSC’s multidisciplinary team of landscape architects, civil engineers, surveyors, planners, and environmental specialists works together to deliver athletic facilities that are functional, buildable, and responsive to each site’s unique constraints. From initial site investigation and conceptual design through construction documents, cost estimating, bidding, and construction administration, we provide seamless support at every phase of project delivery. Practical Solutions Grounded in Local Experience Our experience gives us a strong understanding of the technical, regulatory, and operational issues that shape school athletic projects. We know how to collaborate closely with school administrators, municipal stakeholders, athletic staff, and public agencies to develop practical solutions that align with program needs, available funding, and long- term facility goals. Whether the priority is improving drainage, replacing worn playing surfaces, upgrading spectator amenities, or evaluating synthetic turf alternatives, BSC brings the insight and experience needed to move projects forward efficiently and thoughtfully. Salmon Brook Park Improvements Through our ongoing surveying work, BSC has firsthand knowledge of Salmon Brook Park and the considerations associated with constructing a year-round restroom facility. BSC has designed restroom and concession buildings for parks and athletic facilities in Windsor, Farmington, Milford, and Waterbury. Several projects included coordination with local precast building manufacturers to provide attractive, durable, and readily maintainable facilities. Working with the Town to define its specific needs, BSC can design a facility that supports park operations and long-term community use. BSC provided comprehensive design and construction-phase services for the City of Hartford Public High School’s new synthetic turf field, eight-lane running track, field events, lighting, and related athletic facility improvements. Hartford Public High School, Hartford, CT 4 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP
Page 228
MEET THE EXPERT TEAM BSC has assembled a highly experienced, multidisciplinary team to support the Town of Granby under this on-call contract, with deep expertise in civil and traffic engineering, complemented by in-house landscape architecture, environmental permitting, and construction administration services. We bring decades of experience delivering municipal infrastructure projects throughout Connecticut, including direct support to the Town of Granby under an on-call land surveying contract that has provided our team with firsthand site experience at Salmon Brook Park. Our team is structured to provide responsive, flexible support while maintaining the technical depth and project management rigor required to deliver high-quality results. We function as an extension of municipal staff, offering practical solutions, clear communication, and a strong understanding of local processes to effectively guide each on-call assignment. In the roles of principal-in-charge and project manager, Robert Newton, PE, LEED AP, will oversee the contract and serve as the Town of Granby’s primary point of contact. Rob brings 32 years of experience leading multidisciplinary teams and delivering civil, site, utility, drainage, and transportation projects for municipal and state clients. His directly relevant experience includes athletic field and track improvements, pickleball and tennis court design, stormwater management, drainage design, site utilities, sewer system evaluations and improvements, permitting, and construction administration. He has also managed long-term on-call contracts for municipalities and state agencies, coordinating clients, subconsultants, technical staff, schedules, QA/QC, and construction- phase services across a wide range of assignments. Rob’s project portfolio includes synthetic turf baseball and softball fields, track and field complexes, drainage improvements, sewer infrastructure evaluations, roadway and site improvements, and municipal capital projects requiring practical phasing and close coordination with public-sector stakeholders. Principal-in-charge and project manager Robert Newton, PE, LEED AP, led the design, permitting, and construction administration for synthetic turf baseball and softball field improvements at Jonathan Law High School in Milford, CT. Jonathan Law High School, Milford, CT NARRATIvE / 5
Page 229
Our team organizational chart is provided on the next page, while detailed resumes highlighting each team member’s relevant qualifications and experience are included at the conclusion of the proposal narrative, following descriptions of our most relevant projects. Rob will be supported by a skilled team of civil engineers, landscape architects, and environmental specialists with direct experience delivering athletic facility and municipal infrastructure projects throughout Connecticut. Together, the team will provide the Town with responsive service, clear communication, and the technical depth needed to successfully deliver each assignment under this on-call contract. BSC’s Robert Newton, PE, LEED AP (pictured second from left) and Jesse Harris, PLA, CPSI (pictured at far left) joined the cities of Hartford and New Britain, the Town of Farmington, and the State of Connecticut to celebrate the groundbreaking of the Batterson Park renewal project, which will transform the 266-acre park with expanded recreational amenities and habitat conservation improvements. Batterson Park, Farmington and New Britain, CT 6 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP
Page 230
SPECIALIZED MUNICIPAL ENGINEERING EXPERIENCE BSC is prepared to support the Town of Granby with responsive, task-order engineering services for both defined capital improvement projects and future municipal infrastructure needs. Our team based in Glastonbury brings integrated civil engineering, site design, stormwater management, utility coordination, permitting, surveying, landscape architecture, ecological services, and construction administration experience to help the Town advance projects from planning through design, bidding, construction, and closeout. BSC understands that the Town is seeking a Connecticut-licensed engineering team to support the planning, design, and construction of a replacement athletic/running track and adjacent baseball and softball fields at the high school/middle school complex. The Town also requires on-call engineering services for projects such as a year-round bathroom and pickleball courts at Salmon Brook Park, sewer pump maintenance assessment, and other municipal civil infrastructure needs. BSC’s multidisciplinary structure allows us to match the right staff to each task order, whether the assignment requires conceptual planning, survey and existing conditions documentation, grading and drainage design, utility coordination, permitting, public bidding support, construction observation, or project administration. Our approach is grounded in practical municipal engineering, clear communication, and an understanding that each task must be scoped and delivered efficiently, with attention to schedule, budget, constructability, and long-term maintenance. TOWN OF GRANBY, CT TRAFFIC ENGINEERING Amy Allen, PE, PTOE PERMITTING Melissa Kaplan, PWS CIVIL ENGINEERING Matt Stephan, PE LANDSCAPE ARCHITECTURE Jesse Harris, PLA, CPSI Rachel Salch, PLA PRINCIPAL-IN-CHARGE & PROJECT MANAGER Robert Newton, PE, LEED AP Project Team Batterson Park, Farmington and New Britain, CT CONSTRUCTION ENGINEERING Jessie Dupont IV, PE NARRATIvE / 7
Page 231
Municipal Civil & Site Engineering Sound civil engineering forms the basis of BSC’s municipal work. Our civil engineers have successfully applied their design expertise to a broad range of public infrastructure, recreation, park, school, and site improvement projects. Our services cover each project phase, from initial planning and feasibility review to final design, bidding, construction administration, and owner acceptance. For Granby, this experience is directly applicable to athletic facility improvements, park infrastructure, utility upgrades, pedestrian access improvements, and other on-call civil engineering assignments. BSC can support the Town with site planning, grading, drainage, utility layout, ADA accessibility, pavement design, permitting, cost estimating, construction documents, and construction phase services. BSC’s civil and site engineering capabilities include: Site planning and layout Athletic and recreation facilities design Site grading and earthwork analysis ADA-compliant pedestrian access and circulation Parking, drop-off, and service access review Utility analysis, coordination, and design Stormwater management and drainage design Erosion and sediment control planning Construction phasing and sequencing support Permitting support Plans, specifications, and bid documents Construction administration and field observation Our civil engineers are experienced working on multidisciplinary teams, allowing efficient coordination among surveyors, landscape architects, environmental scientists, permitting specialists, and construction-phase staff. This integrated approach is especially valuable for task-order contracts where assignments may vary in scale, urgency, technical complexity, and required disciplines. BSC provided civil and site design for the City of Hartford’s Front Street District, including geometric layout, grading, storm drainage, sanitary sewer, utilities, erosion control, and integration with existing downtown Hartford infrastructure. Front Street District, Hartford, CT 8 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP
Page 232
Athletic, Park, & Recreation Facility Design Support BSC understands that recreation and athletic facilities must balance performance, safety, accessibility, durability, drainage, maintenance, and user experience. The replacement athletic/ running track and adjacent baseball and softball field improvements identified in the RFP will require careful coordination of existing conditions, field layout, grading, stormwater management, pedestrian access, utility needs, construction sequencing, and long-term maintenance considerations. Our team can support the Town with the planning, design, and construction of recreation-related improvements, including athletic fields, courts, walking routes, park amenities, restroom facilities, parking and access improvements, and supporting infrastructure. For the high school/middle school complex, BSC can evaluate existing site constraints, coordinate survey and utility information, develop design alternatives, prepare construction documents, and provide bid and construction phase services. At Salmon Brook Park, the anticipated bathroom and pickleball court projects will require practical site/civil design that responds to existing park operations, utility availability, accessibility, drainage, public use, and constructability. BSC can help the Town define project requirements early, identify permitting or utility constraints, prepare cost estimates, and advance designs that can be implemented efficiently. BSC transformed George Tirado Sr. Park in Waterbury, CT, into an accessible recreation facility featuring a baseball field, playground, walking paths, and flood-conscious site design. Front Street District, Hartford, CT George Tirado Sr. Park, Waterbury, CT NARRATIvE / 9
Page 233
ADA Access, Pedestrian Circulation, & Site Safety BSC routinely incorporates ADA accessibility, pedestrian circulation, and site safety into municipal design assignments. For school, park, and athletic facility improvements, safe and accessible movement is essential for students, athletes, spectators, park users, maintenance staff, and emergency access. Our team can evaluate existing routes, slopes, crossings, parking connections, field access, restroom access, and pedestrian circulation patterns to identify practical improvements. Design considerations may include accessible routes from parking to fields and courts, compliant ramps and walkway grades, safe crossings between activity areas, accessible spectator areas, maintenance access, and temporary pedestrian routes during construction. Rather than treating accessibility as a separate requirement, BSC integrates ADA compliance into the overall site design, including grading, drainage, pavement, utilities, and landscape improvements. This approach helps reduce conflicts during construction and supports facilities that are safe, functional, and usable for the full community. BSC’s context-sensitive design for the Town of Coventry’s Route 31 Main Street provides significant safety improvements, respects the corridor’s designated historic district, enhances streetscape amenities, and improves pedestrian connectivity issues through a continuous sidewalk. Route 31 Main Street, Coventry, CT 10 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP
Page 234
Drainage Design & Stormwater Management Stormwater management will be a critical component of the athletic field, running track, court, restroom, and park infrastructure improvements. BSC’s engineers are experienced in integrating drainage and stormwater strategies into site layouts while balancing cost, function, regulatory requirements, long-term maintenance, and available space. For athletic and recreation facilities, drainage design affects field playability, pavement durability, user safety, erosion control, and maintenance demands. BSC can evaluate existing drainage patterns, identify problem areas, develop grading concepts, size drainage infrastructure, and prepare stormwater management designs that support both project performance and regulatory compliance. Our stormwater services include hydrologic and hydraulic analysis, drainage system design, low impact development strategies, erosion and sediment control plans, stormwater management reports, construction details, and permitting support. Where appropriate, BSC can incorporate sustainable stormwater measures such as bioretention areas, swales, infiltration practices, pervious pavement, and native planting strategies that reduce runoff impacts while supporting the character and function of the site. For Granby’s on-call needs, BSC can also assist with drainage assessments, stormwater retrofit planning, culvert or pipe evaluations, drainage complaints, maintenance recommendations, and capital improvement planning. BSC’s design for Wilson Gateway Park combines accessible recreation amenities with sustainable stormwater features and received a 2026 Merit Award from the Connecticut Chapter of the American Society of Landscape Architects. Route 31 Main Street, Coventry, CT Wilson Gateway Park, Windsor, CT NARRATIvE / 11
Page 235
Utility Coordination & Sewer Pump Maintenance Support BSC can support the Town with utility-related engineering services, including existing utility research, field verification coordination, assessment of site constraints, coordination with utility providers, development of maintenance or improvement recommendations, preparation of technical specifications, cost estimating, and construction or maintenance administration. For restroom, park, athletic facility, and sewer- related projects, utility coordination may include water service, sanitary sewer, electrical service, drainage infrastructure, communications, and coordination with existing municipal systems. BSC’s engineers understand the importance of identifying utility constraints early, especially on public sites where access, service continuity, safety, and maintenance responsibilities must be clearly defined. Our approach emphasizes practical recommendations, clear documentation, and coordination with Town staff so that utility- related improvements can be planned, budgeted, permitted, and implemented with minimal disruption. Cost Estimating & Budget Support Accurate cost estimating is a critical part of municipal capital project delivery. BSC understands that the Town must make informed decisions about project scope, funding, phasing, bid alternates, and implementation priorities. Our team prepares cost estimates tailored to each stage of design, from early planning-level estimates to detailed construction cost estimates based on quantities, materials, and current bid data. For Granby, BSC can support budget development for athletic facility improvements, park amenities, sewer pump maintenance, utility upgrades, and other on-call assignments. We use quantity-based estimating methods and apply appropriate contingencies based on the level of design completion, project complexity, site constraints, and market conditions. BSC’s estimating approach also supports constructability and decision-making. When appropriate, we can identify cost-saving opportunities, evaluate alternatives, recommend bid alternates, and help the Town prioritize improvements based on available funding. At Avon High School, BSC coordinated the planning, permitting, cost estimating, bidding, and construction of a competition athletic complex designed for multiple sports and long-term performance. Avon High School Athletic Complex, Avon, CT 12 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP
Page 236
Construction Document Preparation Quality construction documents are essential to delivering successful public projects. BSC prepares plans, specifications, details, and bid documents that are clear, coordinated, and suitable for public procurement and construction. Well-prepared documents reduce ambiguity, support competitive bidding, limit change orders, and provide contractors with the information needed to build the project as intended. For task-order assignments, BSC will tailor the level of documentation to the needs of the project. Some assignments may require technical memoranda, sketches, and cost estimates, while others may require full design plans, specifications, permitting documents, and construction bid packages. Our team is experienced in preparing documents for municipal projects that must be practical, biddable, and maintainable. BSC can also provide construction phase services, including pre-bid support, response to bidder questions, review of submittals and shop drawings, field observation, meeting attendance, review of payment applications, punch list preparation, and closeout documentation. Landscape Architecture & Site Amenities BSC’s landscape architects can support Granby’s park, school, and recreation facility improvements by helping create functional, attractive, and maintainable public spaces. For athletic fields, courts, restroom facilities, and park improvements, landscape architecture can help integrate circulation, planting, seating, fencing, signage, shade, site furnishings, and user comfort into the overall design. Our landscape architects work closely with engineers and environmental staff to develop site solutions that respond to grading, drainage, utilities, accessibility, maintenance, and community use. This coordination is particularly important for recreation facilities, where the quality of the user experience depends on more than the primary athletic surface or structure. Potential landscape architecture support for Granby may include conceptual site planning, planting design, site furnishings, pedestrian connections, visual screening, restoration planting, park amenity planning, and coordination of improvements with the surrounding school or park setting. BSC designed Bushnell Gardens in Hartford, CT, as an accessible civic landscape with resilient plantings, shaded seating, improved drainage, and enhanced pedestrian connections. Avon High School Athletic Complex, Avon, CT Bushnell Gardens, Hartford, CT NARRATIvE / 13
Page 237
Permitting & Environmental Support BSC’s technical expertise is complemented by a strong understanding of local, state, and federal regulatory processes. Our permitting specialists and environmental scientists routinely support municipal projects involving wetlands, stormwater, floodplain considerations, site development approvals, erosion control, and environmental resource coordination. For Granby, permitting needs may vary by task order. Athletic facility, park, restroom, drainage, utility, or sewer-related improvements may require coordination with local land use boards, wetlands agencies, health officials, building officials, or state and federal regulatory agencies. BSC can help identify permitting requirements early, define the documentation needed, prepare application materials, and support the Town through the review process. Our permitting strategy focuses on five core steps: Engage regulatory authorities early Define permitting parameters and project constraints Design with permitting requirements in mind Submit complete and clear application materials Support the application through approval and implementation This approach helps reduce delays, clarify expectations, and align design decisions with regulatory requirements. Environmental & Ecological Science BSC’s environmental and ecological science staff can provide as-needed support for projects involving wetlands, watercourses, habitat, floodplains, natural resources, or environmental permitting. This capability may be relevant for park improvements, drainage upgrades, utility projects, or other municipal infrastructure assignments where natural resource constraints are present. Our environmental services include wetland delineation, resource area assessment, impact assessment, mitigation planning, permitting support, habitat assessment, construction- period environmental compliance, and long- term monitoring, where required. Our scientists coordinate closely with engineers and landscape architects so that environmental considerations are integrated into the design from the outset. For Granby’s on-call contract, this in-house capability gives the Town access to environmental expertise when needed without requiring a separate procurement or consultant team for routine resource-related assignments. BSC Permitting Team 14 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP
Page 238
Commitment to Responsive On-Call Service BSC understands that successful on-call engineering requires more than technical capability. It requires responsiveness, clear communication, practical judgment, and the ability to support Town staff across multiple assignments with varying priorities. We will work with Granby to define each task order clearly, confirm schedule and budget expectations, assign the right staff, and maintain consistent communication from authorization through completion. Our goal is to serve as a dependable extension of Town staff, providing engineering services that are technically sound, cost-conscious, constructible, and aligned with Granby’s municipal priorities. RELEvANT PROJECTS On the following pages, we have included project sheets highlighting BSC’s recent, relevant experience providing municipal clients with on-call engineering services and athletic field design. These projects demonstrate our team’s ability to provide the Town of Granby with the high-quality, responsive service needed for this assignment. REFERENCES Suzanne Choate, PE Town Engineer Town of Windsor 860-285-1804 choate@townofwindsorct.com 275 Broad Street, Windsor, CT 06095 Mark Moriarty Director of Public Works City of New Britain 860-826-3374 mmoriarty@ch.ci.new-britain.ct.us 27 West Main Street, New Britain, CT 06051 Mansi Doshi Civil and Environmental Engineer, Project Manager City of Waterbury Development Corporation 203-346-2607 ext. 7285 doshi@wdconline.org 83 Bank Street, 3rd Floor, Waterbury, CT 06702 Adam Kessler, PE Deputy Town Engineer Town of Simsbury 860-658-3260 akessler@simsbury-ct.gov 933 Hopmeadow Street, Simsbury, CT 06070 BSC partnered with the Town of Simsbury to modernize Simsbury High School’s stadium complex with multi-sport synthetic turf and new track surfacing. Simsbury High School, Simsbury, CT NARRATIvE / 15
Page 239
BSC was selected by the Connecticut Metropolitan Council of Governments (MetroCOG) to provide on-call consulting services for the member Towns of Bridgeport, Easton, Fairfi eld, Monroe, Stratford and Trumbull. The on-call service agreement allows these towns to reach out directly to BSC to provide engineering, planning, and survey services without going through the full RFQ/RFP procurement process. BSC has the staffi ng and services to assist the member towns with small and large projects as they arise, and we will work closely with the Town staff to meet the community’s needs. ON-CALL CONSULTING SERvICES BRIDGEPORT, EASTON, FAIRFIELD, MONROE, STRATFORD, & TRUMBULL, CT CLIENT Connecticut Metropolitan Council of Governments SERvICES Planning Civil & Transportation Engineering Permitting & Regulatory Compliance Ecological Science Landscape Architecture GIS & Land Surveying 16 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP
Page 240
BSC has been providing on-call engineering services to the City of New Britain, CT. Under this contract, BSC has provided the city with comprehensive engineering services to eff ectively and economically develop, utilize, and maintain its varied infrastructure and facility assets. BSC’s range of services under this on-call contract includes surveying, permitting, engineering analysis and design, preparation of construction documents, and construction administration. Under its most recent assignment, BSC completed an engineering study of Barbour Road to consider a potential realignment to eliminate a dangerous curve. As part of the study, BSC evaluated conceptual roadway alignments, developed preliminary concept plans and roadway cross-sections, completed a utilities infrastructure analysis, natural resources evaluation (wetlands and ecological), preliminary culvert hydraulic analysis, and construction cost estimating. BSC recently assisted the City of New Britain with the preparation of a LOTCIP application in support of West Main Street between Corbin Avenue and North Mountain Road. This application is to support traffi c calming, enhanced pedestrian access and vehicle access control to the various businesses along the corridor. ON-CALL ENGINEERING SERvICES NEW BRITAIN, CT CLIENT City of New Britain SERvICES Civil Engineering Roadway Engineering Environmental Permitting Construction Administration Infrastructure Analysis NARRATIvE / 17
Page 241
The Town of Simsbury contracted with BSC to provide on-call engineering services. These services may include third-party review services of proposed development projects, intersection safety improvements, survey services, bridge inspection and improvement services, dam safety inspection and improvement services. Most recently, BSC has provided construction review services for a local housing development, survey services for a town-owned parcel in Tariff ville and the Latimer Lane proposed sidewalks, and a signal redesign at Station Street in the town center including coordination with Town staff and CTDOT. ON-CALL ENGINEERING SERvICES SIMSBURY, CT CLIENT Town of Simsbury SERvICES Civil Engineering Traffi c Engineering Land Surveying Planning 18 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP
Page 242
BSC is providing the Town of Waterford on-call consulting engineering services to help support projects throughout the Town. Our team has been working closely with the Department of Public Works to provide engineering studies and designs that will support the health and safety of the community. Being a coastal town, Waterford has a signifi cant need to address coastal bank stabilization and resiliency through additional armoring and the development of living shoreline protection. Our most recent assignments include the analysis and design of coastal embankment stabilization along Old Norwich Road and Niantic River Road. Other assignments include a new culvert and roadway profi le alignment modifi cations of Oswegatchie Road to limit coastal fl ooding and the analysis of water line settlements within the Beacon Hill neighborhoods. ON-CALL ENGINEERING SERvICES WATERFORD, CT CLIENT Town of Waterford SERvICES Civil Engineering Climate Resilience Ecological Science Coastal NARRATIvE / 19
Page 243
BSC provided on-call engineering support to the Town of Windsor, assisting the Town Engineer and supporting the Planning and Zoning Department with development reviews and inspections. BSC conducted drainage, traffi c, and other reviews for site plans and permit applications, prepared reports, and participated in construction inspections. BSC provided engineering design services for municipal buildings, roads, and infrastructure, including construction documents, specifi cations, and project oversight for the Department of Public Works. Additionally, BSC supported permitting and bidding processes, ensuring compliance with Town standards and providing engineering support for community infrastructure projects. ON-CALL ENGINEERING SERvICES WINDSOR, CT CLIENT Town of Windsor SERvICES Drainage, Traffi c, & Site Plan Reviews Civil Engineering Permitting & Bidding Support Construction Inspections 20 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP
Page 244
BSC provided design, engineering, bidding assistance, and construction administration services for the Hartford Public High School Athletic Facility in Hartford, CT, for the conversion of their stadium natural grass fi eld to a synthetic turf fi eld along with a new running track, fi eld events, and associated facility upgrades. The new layout accommodates a new multi-sport synthetic turf fi eld for use by football, soccer and lacrosse within a new 8-lane competitive running track. Improvements also included new track events and sports fi eld, as well as pedestrian lighting. BSC’s team provided design services for the fi eld layouts, obtained local permitting approvals, and developed an opinion of probable construction costs. BSC assisted the city through the construction phase of the project, including submittal reviews, attendance at owner meetings, site visits and reports, and project close-out assistance. Upon completion, the fi eld was tested following the Synthetic Turf Councils guidelines for fi eld performance. ATHLETIC FACILITY IMPROVEMENTS AT HARTFORD PUBLIC HIGH SCHOOL HARTFORD, CT CLIENT City of Hartford SERVICES Survey Programming & Material Selection Synthetic Turf Field Design Running Track Design Cost Estimating Public Bidding Construction Phase Services NARRATIvE / 21
Page 245
BSC provided design, permitting and construction administration services for the conversion of existing natural grass baseball and softball fi elds to synthetic turf along with new dugouts, fencing, ball safety netting and site electrical upgrades. The new facility includes a baseball and softball turf system and a multi-use fi eld overlay in the outfi eld. The design and permitting was completed within three months so that construction could start prior to the new school year. BASEBALL AND SOFTBALL FIELD IMPROVEMENTS JONATHAN LAW HIGH SCHOOL MILFORD, CT CLIENT City of Milford SERVICES Permitting Construction Administration Synthetic Turf Field Design 2021 AMERICAN SPORTS BUILDERS ASSOCIATION /parenleft.caseASBA/parenright.case AWARD 22 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP
Page 246
BSC provided design, engineering, bidding assistance, and construction administration services for Avon High School Athletic Facility. The project involved the conversion of the stadium’s natural grass fi eld to a synthetic turf fi eld along with a new running track, fi eld events, and associated facility upgrades. The new layout accommodates a new multisport synthetic turf fi eld for use by football, soccer, lacrosse and fi eld hockey within an eight-lane competitive running track. Improvements also included new track events, pedestrian accessibility, storage and sports fi eld and pedestrian lighting. The BSC team provided master planning for the fi eld layouts, obtained local permitting approvals, and developed an opinion of probable construction cost. BSC provided construction phase services, including submittal reviews, attendance at owner meetings, site visits and reports, and project close-out assistance. The fi eld was also tested in accordance with Synthetic Turf Council’s guidelines for fi eld performance, and was completed in September 2019. CLIENT Town of Avon SERvICES Master Planning Survey Programming & Material Selection Synthetic Turf Field Design Running Track Design Public Bidding Construction Phase Services AvON HIGH SCHOOL ATHLETIC COMPLEX AVON, CT 2021 AMERICAN SPORTS BUILDERS ASSOCIATION (ASBA) AWARD NARRATIvE / 23
Page 247
The Town of Windsor’s Athletic Field Master Plan recommended improvements to the layout, grading, drainage, turf establishment, and amenities at the heavily used fi elds at Sage Park. BSC was brought on board by the Town of Windsor to provide a full survey of the 12-plus acre park and delineation of the environmental resource areas bordering the fi eld locations. BSC prepared multiple layouts to accommodate three multi-use fi elds for football, soccer, and lacrosse as well as softball and baseball diamonds. In addition to the playing fi elds, BSC designed a paved walking trail around the perimeter of the park and a new well system for fi eld irrigation. Proper grading and an extensive underdrain system will help the fi elds drain properly and promote healthy growth of the turf. BSC accelerated the design of the project to allow an early start to the construction phase and allow additional time for the new turf to become well established before use by the community. During construction, BSC provided construction administration services to support the Town staff . These services included weekly monitoring of the construction progress and inspections of the erosion control measures. SAGE PARK ATHLETIC FIELD IMPROvEMENTS WINDSOR, CT CLIENT Town of Windsor SERvICES Surveying Civil Engineering Landscape Architecture Wetland Delineation Permitting Construction Administration 24 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP
Page 248
BSC provided planning, design, and construction support for the Clover Street Park Cricket Field Improvements project in Windsor, CT. Completed in 2025, the project expanded the Town’s recreational off erings to support the growing popularity of cricket while improving the park’s overall function and usability. Improvements included a regulation cricket pitch with specialized turf materials and subgrade preparation designed for performance and durability. BSC also addressed grading and drainage to improve fi eld conditions and support long-term use, along with outfi eld and perimeter upgrades coordinated with existing park amenities. Working closely with Town staff and stakeholders, BSC developed a practical, sustainable design that supports organized competition, informal play, and broader community use. The completed fi eld provides a high-quality recreational asset that expands athletic opportunities and supports more inclusive programming. CRICKET FIELD AT CLOvER STREET PARK WINDSOR, CT CLIENT Town of Windsor SERvICES Land Surveying Civil Engineering Athletic Facility Design Construction Administration NARRATIvE / 25
Page 249
Working as a subconsultant to the project architect, BSC provided athletic facility design and engineering services for the conversion of a clay softball infi eld to synthetic turf. The project goals were to eliminate maintenance of the clay infi eld, meet current NCAA standards, and improve player safety. The project also included the addition of covered dugouts, portable press box, new backstop, bullpens, and fencing. To improve player safety and meet current NCAA fi eld requirements, the existing fi eld was moved seven feet to maximize foul territory, remove retaining walls from the fi eld of play, provide expanded covered dugouts and home and visitor bullpens, and meet minimum outfi eld-distance requirements. The synthetic turf system was selected to mimic a more natural ball reaction and complement the existing, previously installed synthetic turf outfi eld. The University took advantage of the synthetic turf surface to add school branding with inlaid logos. WOMEN’S SOFTBALL FIELD IMPROVEMENTS SALEM STATE UNIVERSITY SALEM, MA CLIENT Salem State University SERVICES Athletic Facility Design Civil Engineering Construction Administration 26 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP
Page 250
YEARS OF EXPERIENCE 32 EDUCATION BS, Civil Engineering, Union College REGISTRATIONS Professional Engineer • CT #20662 • MA #49276 LEED Accredited Professional AFFILIATIONS • American Society of Civil Engineers • U.S. Green Building Council Robert Newton, PE, LEED AP Senior Civil Engineer Vice President MEET ROB Rob has extensive civil engineering experience, especially in the areas of site and roadway design, hydraulic analyses, and permitting support for municipalities, private entities, and government organizations, including both the Connecticut Department of Transportation (CTDOT) and Massachusetts Department of Transportation (MassDOT). Rob is well-versed in all aspects of site and roadway design, including site planning, drainage design, stormwater management, site utility design, sedimentation, and erosion control plans. Accustomed to leading teams of engineers, planners, surveyors, and scientists in the delivery of cohesive and exemplary projects, Rob manages to combine his technical expertise with best management practices. He has also developed flood protection systems along several major bodies of water within the state, including the Connecticut, Hockanum, and Westfield Rivers. PROJECT EXPERIENCE HIGHLIGHTS Simsbury On-Call Engineering Services, Simsbury, CT Project Manager Provided management for the on-call services which required coordination with the client, oversight of design professionals, and overall QA/QC services. Provided the Town with construction management support for bond recording, drainage design, and traffic signal design services for the intersection of Station Street and Hopmeadow Street. Baseball and Softball Field Improvements at Jonathan Law High School, Milford, CT Civil Engineer Responsible for design, permitting, and construction administration for the conversion of existing natural grass baseball and softball fields to synthetic turf along with new dugouts, fencing, ball safety netting, and site electrical upgrades. The new facility includes a baseball and softball turf system tuned for the respective sports performance requirements. There is also a multiuse field overlay in the outfield to accommodate Junior Varsity play and practices. Played a large role in reviewing the project as well as troubleshooting challenging components. NARRATIvE / 27
Page 251
Robert Newton, PE, LEED AP Region 16, Woodland High School Track and Field, Beacon Falls, CT Civil Engineer Supported design, permitting, and construction administration for the new track and field complex replacing the existing natural grass field with a synthetic turf. Design services including grading, drainage, and site infrastructure. Coordinated with the project team to incorporate ADA accessibility and pedestrian circulation, while meeting NFHS standards. East Hartford On-Call Engineering Services, East Hartford, CT Project Manager Responsible for managing various engineering projects for over a decade. Designed to support town staff, these services included traffic management, GIS mapping update, environmental studies, pavement evaluation, FEMA map revisions, geotechnical services, engineering reviews, utility design, structural inspections, hydraulic analyses, flood protection system design and maintenance, surveying, and construction engineering/inspection. Oversaw all assignments associated with this contract. Project responsibilities included coordinating with the client, securing and monitoring all subconsultants, and providing overall project management and QA/QC services. He oversaw survey efforts and provided roadway, traffic, utility and site/civil engineering, including hydraulics and hydrology, for a variety of projects, including: Orchard Street Drainage Improvements Pedestrian Foot Bridge Replacement, Burnside Avenue to Labor Field Governor Street Reconstruction, Geotechnical and Traffic Engineering, Retaining Wall Design Traffic Counts/ADT Development Bridge Scour Evaluation Stormwater Pollution Prevention Plan for Transfer Station Flood Protection System Inspection and Repairs LOMR Request Preparation for FEMA, Hillside Street/Burnside Avenue Parcel Kelly Martin Tighe Field Improvements, Milford, CT Civil Engineer Responsible for the design, permitting, and construction administration services for the conversion of a natural grass soccer field to two synthetic turf multiuse fields complete with fencing, ball safety netting, sidewalks, and wetland restoration plantings. The team was challenged to fit the desired program by existing soil conditions and surrounding wetlands. The design team’s solution met the defined program with minimal impact to surrounding wetlands, which required local and federal permitting and long-term stability of the underlying soils. Connecticut Department of Construction Services (CT-DCS) On-Call Engineering Services, Various Locations, CT Project Manager Responsible for the management of the State’s surplus property program. Tasks included identifying which services would be required to ensure proper sale of the property to an outside interest. Assignments included: H.H. Ellis Technical High School Track Replacement and Drainage Improvements Connecticut Valley Hospital Storm and Sewer System Evaluation Connecticut Army National Guard – Camp Hartell Sewer Improvement Uncas-on-Thames Sewer Evaluation Connecticut Army National Guard – Camp Hartell General Infrastructure Improvements Connecticut State Library/Supreme Court Drainage Improvements Garner Correctional Institution Water System Improvements Tennis Courts at Renbrook School, West Hartford, CT Civil Engineer Supported design and permitting for four post- tensioned concrete tennis and pickleball courts, including grading, drainage, and site layout. Coordinated with the team to advance the site development program and secure local approvals, while incorporating player and spectator amenities. New Britain On-Call Engineering Services, New Britain, CT Project Manager Provided management for the on-call services which required coordination with the client, securing and monitoring all subconsultants, and overall QA/QC services. Provided the City with pre- design services for the West Street Streetscape improvements for local transportation grant application. 28 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP
Page 252
YEARS OF EXPERIENCE 12 EDUCATION BS, Civil Engineering University of Connecticut REGISTRATIONS Professional Engineer • CT #34678 • MA # 57373 • RI #15358 AFFILIATIONS • American Society of Civil Engineers Matt Stephan, PE Civil Engineer Senior Associate MEET MATT Matt is a civil engineer with extensive experience in site and infrastructure design, including erosion and sedimentation control, grading and drainage, utilities, hydrologic and hydraulic analysis, stormwater management, stream and culvert modeling, permitting, and construction support. His work spans public and private projects ranging from roadway and bridge improvements to school, park, housing, and municipal site development. He has prepared hydraulic models and reports, supported local, state, and federal permitting, and provided construction administration and field coordination, bringing a practical understanding of how projects move from analysis and design through implementation. PROJECT EXPERIENCE HIGHLIGHTS Baseball and Softball Field Improvements, Jonathan Law High School, Milford, CT Project Engineer Prepared grading, drainage, and utility design for conversion to synthetic turf fields with new dugouts, fencing, netting, and electrical upgrades. Led stormwater management effort and preparation of Stormwater Report to support local land use permitting. Woodland High School Track and Field, Beacon Falls, CT Project Engineer Prepared design, permitting, and construction documents for replacement of the existing running track and conversion of the natural grass infield to synthetic turf, including drainage, erosion controls, and stormwater management design to support local permitting efforts. Provided construction administration support throughout construction. Crosby High School Athletic Field and Track Improvements, Waterbury, CT Civil Designer Responsible for engineering design for the Crosby High School Athletic Field and Track Improvements project. The project involved the installation of an artificial turf field; an alternate design for a sod field including regrading and an irrigation system; installation of an additional track lane; field drainage improvements; regrading, paving and surfacing of the existing track and track/field event stations; installation of new field and track event equipment; and fencing improvements. NARRATIvE / 29
Page 253
Matt Stephan, PE Athletic Field Renovations at Bloomfield High School, Bloomfield, CT Civil Designer Provided design services for the Athletic Field Renovations at Bloomfield High School project. Project tasks included resurfacing of the existing track, a new all-weather grass sports system, and new runways for pole vault, long/triple jump, and high jump. The engineering components included site demolition, erosion and sedimentation control, grading and drainage, and utility configuration. Plainville High School Field and Track Improvements, Plainville, CT Civil Designer Responsible for providing support for the installation of two artificial turf fields, regrading, paving, and surfacing of the existing track as well as new runways for pole vault, long/triple jump, and high jump. The engineering components included site demolition, erosion and sedimentation control, grading and drainage, and utility configuration. The Renbrook School Athletic Field Reconstruction, West Hartford, CT Project Engineer Prepared drainage and stormwater management design to support conversion of natural grass field to synthetic turf, with fencing, sidewalks, and parking. The design integrated the field into a historic landscape while addressing challenging topography, strict local stormwater standards, and poor geotechnical conditions, in coordination with the School, Town, and Kaestle Boos Associates. Tennis Courts at Renbrook School, West Hartford, CT Project Engineer Led grading, drainage, and utility design for construction of four post-tensioned concrete tennis and pickleball courts. Design challenges included ADA accessibility to the field over steep topography, strict local stormwater management standards, and poor geotechnical conditions. Design incorporated several LID features for stormwater management, including an infiltration basin and a dry water quality swale, in coordination with the School and Town. Improvements to Batterson Park, Farmington, CT Project Engineer BSC was retained by the City of Hartford to provide full site design services for the Improvements to Batterson Park in Farmington, CT. Closed to the public for a number of years, BSC worked closely with the City of Hartford, CT DEEP, Town of Farmington, and other stakeholders to prepare a design for a new park facility including paved parking for approximately 100 vehicles, public restroom building, maintenance building, walking trails and boardwalks, playground, splash pad, pavilion and picnic areas, a kayak launch at Batterson Park Pond, and stormwater management facilities. BSC was also responsible for leading the project through an aggressive permitting schedule, including local, state, and federal permit applications. BSC also provided construction administration services during construction, including shop drawing review and responses to Contractor RFIs. Northwest Catholic High School Breen Athletic Complex, West Hartford, CT Project Engineer Prepared design, permitting, and construction documents for a multi-sport synthetic turf complex, including grading, drainage, and site infrastructure. Coordinated with the project team to incorporate ADA accessibility, pedestrian circulation, and amenities such as bleachers, netting, and support facilities, while meeting NFHS standards, accommodating multi-season athletic use, and complying with strict local stormwater standards. Provided construction administration support throughout construction. L.P. Wilson Field Improvements, Windsor, CT Civil Designer Provide design services for the L.P. Wilson Field Improvements project. The project involved the installation of multiple artificial turf fields. The engineering component included site demolition, erosion and sedimentation control, and grading and drainage. Additionally, the project required a Stormwater Pollution Control Plan to be prepared and submitted to the Department of Energy and Environmental Protection. Additions and Renovations to Chamberlain Elementary School, New Britain, CT Project Engineer Responsible for site civil engineering services associated with the design of a renovation of the existing school. Design services included preparation of erosion and sedimentation control plans, site utility demolition, site grading, site drainage, and utilities, as well as coordination with the architect and other members of the design team. The site stormwater management systems were designed in accordance with local and state requirements and detailed in a Stormwater Management Report. 30 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP
Page 254
YEARS OF EXPERIENCE 11 EDUCATION MS, Transportation Engineering, Northeastern University BS, Civil Engineering, Northeastern University REGISTRATIONS Professional Engineer • MA #55337 • CT #38141 • NH #17943 • RI #14156 • ME #18951 • VT #18.0135752 Professional Traffic Operations Engineer #4994 CERTIFICATIONS • IMSA Traffic Signal Technician #135570 (2024) • OSHA Construction Safety & Health AFFILIATIONS • Institute of Transportation Engineers • Women's Transportation Seminar Amy Allen, PE, PTOE Transportation Project Manager Senior Associate MEET AMY Amy is a transportation engineer with 11 years of experience in roadway design, traffic analysis, roadway safety, signal design, and traffic management planning. Her background includes capacity analysis, crash analysis, Road Safety Audits, Intersection Control Evaluations, traffic impact studies, signal timing and layout, signing and pavement marking design, and traffic management planning for roadway, intersection, bridge, and multimodal improvement projects. AMY HAS SUPPORTED A WIDE RANGE OF PUBLIC AND PRIVATE SECTOR ASSIGNMENTS, CONTRIBUTING TECHNICAL ANALYSIS, DESIGN DEVELOPMENT, AND IMPLEMENTATION SUPPORT TO IMPROVE SAFETY, OPERATIONS, AND MULTIMODAL ACCESS. PROJECT EXPERIENCE HIGHLIGHT: MassDOT, Broadway Reconstruction, Malden, MA Lead Traffic Engineer Project consists of the design and reconstruction of a 1.6-mile-long segment of Broadway from the Everett City Line to the Melrose City Line. The project includes the complete streets design of the roadway, including improved pedestrian and bicycle safety and access. Responsible for overseeing the Intersection Control Evaluation (ICE) process which determines the optimal traffic control strategy at three project intersections to balance multimodal safety, traffic operations, lifecycle cost, and environmental impacts. She is also currently overseeing a Road Safety Audit (RSA) for the corridor, which includes preparing an in-depth crash analysis, convening various stakeholders such as state and local officials, first responders, and FHWA representatives to visit the site and identify safety concerns and potential countermeasures. MassDOT, Local Bottleneck Reduction Grant Program, Various Locations, MA Project Manager/ Lead Traffic Engineer The MassDOT Local Bottleneck Program was established to help municipalities address congestion on locally owned roadways. BSC supports this program by reviewing grant applications, coordinating with municipalities, obtaining traffic signal timings, observing traffic operations, evaluating existing traffic signal equipment and operations, and developing improvement plans to alleviate traffic congestion and enhance safety at various intersections. Responsible for overseeing the design of proposed improvements and coordinating with clients and MassDOT. NARRATIvE / 31
Page 255
Amy Allen, PE, PTOE Downtown Streetscape Improvements, Ashland, MA Transportation Designer Responsible for the design review and feasibility study for the Town of Ashland’s Downtown Streetscape Improvement project. Contributed the feasibility analysis for pedestrian access and walkability in the downtown area. Design of Traffic Signals at the Intersection of River Street, Farwell Street, and Seyon Street, Waltham, MA Traffic Analyst Supported the design services for the reconstruction of the River/Farwell/Seyon Street intersection. BSC is replacing the existing traffic signal equipment, which is outdated and does not meet current MUTCD standards. The design will also interconnect the adjacent Willow/River Street intersection and have all left turning lanes operate under a protected-permitted phase. Quincy Center Redevelopment, Quincy, MA Traffic Analyst Responsible for the preparation of a traffic evaluation for the redevelopment of Quincy Center. The evaluation provided a revised analysis of a Draft Environmental Impact Report based on a new development program. BSC estimated trips to be generated by the project, distributed the project trips onto the roadway network, and performed capacity analyses at the nineteen (19) study area intersections. BSC evaluated future traffic conditions under a 10-year planning horizon. Tremont Crossing, Boston, MA Traffic Analyst Responsible for the preparation of a Draft Project Impact Report for the development of a large mixed-use development in the Roxbury neighborhood of Boston. BSC prepared the transportation section of this report, comprised of a comprehensive traffic and parking analysis which examined traffic, parking, public transportation, pedestrian access, and loading activities in the vicinity of the project. Trip generation estimates, transportation impacts, capacity analysis, shared parking analysis, signal warrant analysis, and transportation demand management measures were also included. Massachusetts Avenue Improvements, Lexington, MA Transportation Designer Responsible for the design of roadway and intersection improvements along the Massachusetts Avenue corridor between Pleasant Street and Marrett Street. This included the design of signal layout and timing plans, in addition to signing and pavement markings for vehicles, bicycles, and pedestrians. Fellsway East and Highland Avenue Intersection Improvements, Malden, MA Traffic Analyst Responsible for the preparation of a traffic study and conceptual designs for the intersection of Fellsway East and Highland Avenue. This intersection experiences a high number of crashes, which prompted the Department of Conservation and Recreation to find ways to improve safety at this key location. The traffic study identified the existing operational and safety issues at the intersection and discussed conceptual design alternatives. It involved the collection and analysis of traffic volumes and crash data, intersection capacity analyses, development of potential intersection improvement alternatives, and recommendation of short and long-term improvements. 881 and 891 Route 28 (Main Street), South Yarmouth, MA Traffic Analyst Responsible for the preparation of a Traffic Impact Study for a mixed-use commercial/ business/ residential development. The potential development proposed to construct 120 residential units and 18,000 SF of combined retail and office space on lots was occupied by the former Cavalier Motor Lodge and Bass River Motel. The study included a review of existing traffic and roadway conditions, as well as a review of the recent history of crashes at study area intersections. It identified background traffic growth for study area roadways, estimated additional traffic generated by the proposed development, and evaluated traffic impacts due to project-generated traffic. The impacts of additional traffic associated with this expansion were evaluated under a five-year planning horizon. 32 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP
Page 256
YEARS OF EXPERIENCE 20 EDUCATION BS, Landscape Architecture, University of Massachusetts Amherst AS, Landscape Contracting, University of Massachusetts Amherst REGISTRATIONS Licensed Landscape Architect • CT #1224 CERTIFICATIONS • OSHA Construction Safety and Health • CPSI Certified Playground Safety Inspector AFFILIATIONS • American Society of Landscape Architects • CT Chapter-American Society of Landscape Architects • CT Recreation and Park Association • American Sports Builders Association Jesse Harris, PLA, CPSI Senior Landscape Architect Senior Associate MEET JESSE Jesse is a landscape architect with experience in the areas of athletic facility assessment and design, landscape architecture, urban design, planning, and project management. His wide range of experience encompasses all facets of site development including but not limited to site assessment, design, specification writing, contract document preparation and management of design teams. Jesse's knowledge of state and local permitting processes plays an integral role in his understanding of the entire process from schematic design through construction administration. PROJECT EXPERIENCE HIGHLIGHTS Wilby High School Athletic Complex, Waterbury, CT Landscape Architect Responsible for site evaluation/needs assessment and conceptual design services for a multi-field athletic complex. BSC conducted a comprehensive facility evaluation and needs assessment, programmed the new facilities with the project stakeholders, and prepared conceptual designs, narrative summaries, and cost estimates for two scenarios. The designs included natural and synthetic turf fields, lighting, enhanced athlete/spectator access and handicapped accessibility, stormwater management, new parking facilities, restrooms, concessions, and storage. Athletic Facility Improvements, Hartford Public High School, Hartford, CT Project Manager, Landscape Architect Provided architect support and management for design, engineering, bidding assistance, and construction administration services for the Hartford Public High School Athletic Facility in Hartford, Connecticut for the conversion of their stadium natural grass field to a synthetic turf field along with a new running track, field events, and associated facility upgrades. The new layout accommodates a new multi-sport synthetic turf field for use by football, soccer, and lacrosse within a new 8-lane competitive running track. Improvements also included new track events and sports field and pedestrian lighting. Led a team of professionals that provided design services for field layouts, local and federal permitting approvals, and development of opinion of probable construction costs. Upon selection and award of a contractor, BSC will assist the city through the construction phase of the project, including submittal reviews, attendance at owner meetings, site visits and reports, and project close-out assistance. NARRATIvE / 33
Page 257
Jesse Harris, PLA, CPSI O’Brien Stadium and Windsor High School Athletic Facility, Windsor, CT Landscape Architect Responsible for design and construction oversight of renovations to the athletic facility at the O’Brien Stadium Field. The fully renovated facility includes a new competitive running track, track & field events, a multi-purpose synthetic turf field, a natural grass practice football field, a press box, home and away bleachers, a multi-sport scoreboard, walkways, fencing, and miscellaneous improvements to the site. Led the project team through programming with the Athletic Director and Town stakeholders, local permitting, and a series of Town meetings, ultimately gaining approval of the project funding at a Town wide vote. Wilson Gateway Park, Windsor, CT Landscape Architect Responsible for the conceptual design and general design oversight throughout the project while maintaining design integrity. The project aimed to redevelop an open parcel of land in an underserved neighborhood. The design provides parking, a new inclusive playground, a meadow glade, plaza areas, a grand lawn with a large pavilion and concert space, and public restrooms. Crosby High School Athletic Facility, Waterbury, CT Landscape Architect Responsible for the reconstruction of Crosby High School’s track and field complex. The scope of work included widening the existing running track to allow a full-size soccer field on the track interior as well as converting the interior field to synthetic turf. The scope of work included design, permitting and construction oversight for a new eight-lane, urethane surfaced running track, Installation of new drainage, a new synthetic turf field with resilient underlayment, new scoreboards, and amenities as well as the design of a new concessions building and entry ‘portal.’ Baseball and Softball Field Improvements at Jonathan Law High School, Milford, CT Project Manager Responsible for managing the design, permitting and construction administration for the conversion of existing natural grass baseball and softball fields to synthetic turf along with new dugouts, fencing, ball safety netting and site electrical upgrades. The new facility includes a baseball and softball turf system tuned for the respective sports performance requirements. There is also a multi-use field overlay in the outfield to accommodate Junior Varsity play and practices. Led a multi-disciplined team of professionals to complete the design and permitting within three months so that construction could start prior to the new school year. Avon High School Athletic Facility Improvements, Avon, CT Project Manager, Landscape Architect Responsible for managing master planning and design services for the Avon High School Athletic Facility. The fully renovated facility includes a new competitive running track, track & field events, a multi-purpose synthetic turf field, walkways, fencing, and miscellaneous improvements to the site. Led the project team through final design, local permitting, and a series of Town meetings to place the project for town wide referendum vote. Regional School District 8, School Campus Study, Hebron, CT Landscape Architect Responsible for the assessment of the campus grounds, existing conditions and necessary improvements associated with parking, pedestrian accessibility, pavement, landscape architecture and athletic facilities. Assessed the condition of the existing landscape and assisted with the assessment of site building code issues and concrete condition as well as the running track, track and field events, field condition and various cost estimates. Lyman Hall High School Stadium Renovation, Wallingford, CT Landscape Architect Responsible for design and renovations of the Lyman Hall football stadium. BSC provided design of a new multi-sport synthetic turf system, a new and expanded running track, new track event areas, sports field lighting, team rooms, weight and training rooms, storage buildings, coach’s offices, and officials’ offices to increase the usability of their facility for high school and community sports organizations. Tennis Court Renovations at Cove Island Park, Stamford, CT Project Manager Responsible for the design and construction administration for renovations of asphalt tennis courts at Cove Island Park to post-tensioned concrete courts. The renovations included reclaim in place of the asphalt court surface, new fencing, ADA access improvements, striping for three tennis courts, and the addition of two pickleball courts. 34 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP
Page 258
YEARS OF EXPERIENCE 11 EDUCATION BS, Landscape Architecture, University of Rhode Island REGISTRATIONS Registered Landscape Architect • CT #1438 CERTIFICATIONS • FAA Certified Remote Pilot • OSHA Construction Safety and Health AFFILIATIONS • American Society of Landscape Architects • CT Chapter American Society of Landscape Architects Rachel Salch, PLA Landscape Architect Associate MEET RACHEL Rachel is a landscape architect with involvement in projects including site analysis and design, master planning, site plan development, landscape planting design, construction document development, and construction administration. She has worked on a variety of projects throughout her career, which has expanded her knowledge base and professional skills. Rachel has been heavily involved in the design and oversight of construction for many projects throughout her career, specializing in parks, campuses, and public spaces. She has also been learning the craft of cemetery design, athletic facilities, and other niche practices. Rachel uses her skills across digital programs and photography to not only be an integral part of the design team, but to be able to bring life and color into the design as it transforms from conceptual idea to part of reality. Rachel is also an experienced and certified drone pilot, which she uses for photography throughout the design process and site analysis. PROJECT EXPERIENCE HIGHLIGHTS Athletic Facility Improvements, Hartford Public High School, Hartford, CT Landscape Architect Provided support for design, engineering, bidding assistance, and construction administration services for the Hartford Public High School Athletic Facility in Hartford, Connecticut for the conversion of their stadium natural grass field to a synthetic turf field along with a new running track, field events, and associated facility upgrades. The new layout accommodates a new multi-sport synthetic turf field for use by football, soccer and lacrosse within a new 8-lane competitive running track. Improvements also included new track events and sports field and pedestrian lighting. New Milford High School Athletic Facility, New Milford, CT Landscape Designer Prepared design plans for the New Milford High School athletic facility, including a main stadium synthetic turf field with an eight-lane track, new field lighting and events, a secondary multi-sport turf field, and ADA-accessible paths. Rachel helped advance the project from concept through construction documents and supported construction through field reports and meeting documentation. NARRATIvE / 35
Page 259
Rachel Salch, PLA Avon High School Athletic Facility, Avon, CT Landscape Architect Responsible for master planning and design services for the Avon High School Athletic Facility. The fully renovated facility includes a new competitive running track, track & field events, a multi-purpose synthetic turf field, walkways, fencing, and miscellaneous improvements to the site. Rachel assisted through final design, local permitting, and a series of Town meetings to place the project for town wide referendum vote. She also helped with bid services and construction administration. Baseball & Softball Field Improvements at Jonathan Law High School, Milford, CT Landscape Architect Responsible for managing the design, permitting and construction administration for the conversion of existing natural grass baseball and softball fields to synthetic turf along with new dugouts, fencing, ball safety netting and site electrical upgrades. The new facility includes a baseball and softball turf system tuned for the respective sports performance requirements. There is also a multi-use field overlay in the outfield to accommodate Junior Varsity play and practices. Rachel was responsible for site analysis, conceptual design, cost estimation, construction documentation, bid services, and construction administration. Improvements at Kelly Martin Tighe Field, Milford, CT Landscape Architect Rachel was responsible for site analysis, conceptual design, cost estimation, construction documentation, bid services, and construction administration for the conversion of a natural grass soccer field to two synthetic turf multi-use fields. The team was challenged to fit the desired program by existing soil conditions and surrounding wetlands. The design team’s solution met the defined program with minimal impact to surrounding wetlands, which required local and federal permitting and long-term stability of the underlying soils. East Windsor Playground, East Windsor, CT Project Manager Rachel managed the design and permitting of a new playground at 27 Reservoir Road, including a new parking area and sidewalk for ADA access, shaded play equipment, and a seating area. She was responsible for data gathering, concept development, permitting, construction documents, and bidding. Orange Avenue Athletic Facility, Milford, CT Landscape Designer Responsible for site programing and preparation of design plans for the addition of two new multi-sport synthetic turf fields and adjacent parking lot for the City of Milford. Located adjacent to the YMCA, the new facility is already in a place where people are going for recreation. BSC was also responsible for assisting the Town with a land exchange with the neighboring YMCA in order to have the space necessary for the new facility. The agreement also included the redevelopment of the existing YMCA parking lot. Rachel worked on conceptual planning for the site and for the land swap as well as construction documents for the project. She also has been involved with the construction of the project through the preparation of field observation reports and meeting minutes. Regional School District 8 Athletic Facilities Master Plan, Hebron, CT Landscape Architect Provided architectural services for an athletic field needs assessment and master plan for the RHAM High School. Rachel contributed to the project with the development of site evaluation and condition assessments, assisted with recommendations and final master plan report and cost estimating. The plan will lay out short- and long-term capital improvements to the athletic facilities. Orton Field Improvements, Boston, MA Athletic Field Designer Responsible for design improvements to Orton Field in the south end of Boston. The improvements include the conversion of a natural grass field to synthetic turf, new four land running track, fencing, and walkways. The use of synthetic turf surfacing was chosen to improve durability and reduced maintenance for the heavily used park. Rachel assisted in the preparation of design details and technical specifications for the synthetic turf system and running track surface. Regional School District 8, School Campus Study, Regional School District 4 Athletic Facilities Master Plan, Deep River, CT Landscape Architect Provided architectural services for a comprehensive athletic field needs assessment and master plan for the Valley Regional High School and John Winthrop Middle School. Rachel contributed to the project with the development of field inventory and base mapping, site evaluation and condition assessment, assisted with recommendations and final master plan report and cost estimating. 36 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP
Page 260
YEARS OF EXPERIENCE 24 EDUCATION MS, Marine Biology, Nova Southeastern University BS, Zoology, University of Florida REGISTRATIONS Professional Wetland Scientist, Society of Wetland Scientists • #2327 CERTIFICATIONS • OSHA 10-Hour Construction Safety and Health • APM Project Management Master AFFILIATIONS • Connecticut Association of Wetland Scientists • Connecticut Power and Energy Society • Environmental Business Council of New England and Connecticut • Association of Massachusetts Wetland Scientists • Native Plant Trust, PCV Program Rare Plant Volunteer Surveyor Melissa Kaplan, PWS Licensing and Permitting Team Lead Vice President MEET MELISSA Melissa is a Professional Wetland Scientist and the Licensing and Permitting Team Lead at BSC. She is based out of BSC’s Glastonbury, Connecticut Office and has extensive environmental and biological consulting experience and specialization in federal, state, and local environmental licensing and permitting throughout New England (MA, CT, NH, and RI); threatened and endangered species surveys; and mitigation design and habitat restoration. She has worked on numerous projects from the early coordination phase to biological assessments and permitting phases, and to the final construction and wetland monitoring phase, including public and private development, natural gas pipeline, electric utility, solar, transportation and municipality projects. PROJECT EXPERIENCE HIGHLIGHTS Batterson Pond Park Renovations, Farmington, CT Senior Wetland Scientist Directed ecological surveys and complex inland wetland delineation for a multi-municipal park renovation involving Hartford, Farmington, New Britain, CT DEEP, and the federal US Army Corps of Engineers. The project included trails, amenities, parking, and water-based features, with a focus on wetland and water resource protection and improved pond water quality. Managed a challenging delineation requiring separate identification of state and federal wetlands and coordinated inter-municipal design and environmental review. Assisted in responding to local Conservation Commission requests for additional information. Kensington Avenue Flood improvement and Culvert Replacement Project, Meriden, CT Senior Wetland Scientist Responsible for the local, state, and federal permitting of a flood improvement project along Kensington Avenue in Meriden, CT. The project included roadway reconstruction, replacement of a culvert and stream bank restoration to help reduce flooding in the area. Project responsibilities included conducting field work and preparing the USACE wetland data forms for permitting. Other project tasks included managing preparation and submittal of the USACE Pre- Construction Notification Form application, CT DEEP NDDB Project review checklist for rare species, CT DEEP Individual Section 401 Water Quality Certification, and USFWS Section 7 consultation through IPaC. NARRATIvE / 37
Page 261
Melissa Kaplan, PWS Nathan Hale Greenway, Coventry, CT Ecology & Permitting Specialist Supported team in conducting the study and preliminary design for a 7.5-mile multi-use path along the former CTDOT corridor and oversaw the development of a route selection alternatives matrix, offering graphical comparisons and construction cost estimates for each potential route. DEEP Pachaug Mountain Trail Design, Voluntown, CT Ecology & Permitting Specialist Providing ecological and permitting services for the design and mapping of a series of mountain bike trails within Pachaug State Forest in Voluntown, CT, on behalf of the Connecticut DEEP. The trail design will encompass 30 miles of sustainable, low- maintenance mountain bike trails aimed at enhancing safety and accessibility for outdoor enthusiasts across the state. Island View Farms, Wetland Restoration Project, East Windsor, CT Project Manager Project manager for restoring and mitigating wetland fill at a site in East Windsor, CT. Oversaw field investigations, survey, permitting, and wetland mitigation plan design. Oversaw the installation of monitoring wells for review of groundwater levels to ensure proper wetland creation area design. Oversaw preparation of applications for and obtained local Inland Wetlands and Watercourse Commission and Planning Board Site Plan Special Use Permits. Attended several Inland Wetlands and Watercourses Commission and Planning Board meetings. Coordinated closely with the Town staff and worked with LEP subconsultant to test soils for contamination. Will also oversee mitigation area creation. Bridge Improvements, Goshen, CT Project Manager Responsible for providing wetland delineation services for the Town of Goshen Bridge 05155 Improvement Project. The bridge carries West Hyerdale Drive over the Marshapaug River and the Town of Goshen is proposing to repair the bridge by installing structure lines in the existing culverts. Ms. Kaplan oversaw wetland delineations, invasive species inventories, reporting, a wetlands functions and values assessment, and an invasive species control plan to support local, state, and federal permitting of the proposed improvements. Highland Division Trail, Springfield, MA Ecology and Permitting Specialist Oversaw the ecological and permitting milestones for the construction of the trail segment between Hickory Street and Springfield College to East Longmeadow. The Highland Division trail will be approximately 1.75 miles long along the abandoned rail corridor. This multi-use trail will be a 12-foot- wide paved path to be used by local walkers, joggers, and cyclists in the area. Citywide Invasive Species Management Plan, Stamford, CT Project Manager Managed a team of botanists and scientists to conduct a comprehensive survey of invasive plant species at 32 City parks, totaling approximately 448 acres to create a Geographic Information System (GIS) based inventory. Currently overseeing the preparation of the Citywide invasive species management plan for the City. Working with experienced staff, the management plan is being prepared as a 5-year adaptive plan which allows the city to select the management using non- chemical means first and modify the techniques over time. Analyses were conducted on the resources (City staff, volunteers, and consultants) needed to complete the management activities outlined in the plan. CT Department of Agriculture Farmland Restoration, Climate Resiliency and Preparedness Program, Statewide, CT Project Manager Managing a statewide initiative supporting the Connecticut Department of Agriculture’s Farmland Restoration and Climate Resiliency (FRCR) Program. Overseeing a multidisciplinary team of soil scientists, wetland scientists, climate resiliency specialists, and engineers to assess agricultural land for restoration potential and long-term climate adaptation. Directing all phases of project delivery, from application review and landowner coordination to site assessment, FRCR Plan development, and final reporting. Leading the implementation of a structured, science-based methodology to evaluate soils, hydrology, climate vulnerability, and land use practices on active farmland. Oversaw and conducted field assessments to identify restoration priorities and recommend climate-resilient infrastructure, green solutions, and soil and water resource improvements. Delivered comprehensive FRCR Plans and Completion Reports to the Department of Agriculture ensuring regulatory compliance and environmental integrity. 38 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP
Page 262
YEARS OF EXPERIENCE 5 EDUCATION BS, Civil Engineering, University of Connecticut LICENSES Professional Engineer • CT #39401 CERTIFICATIONS • OSHA-10 Jessie Dupont IV, PE Civil Engineer / Site Design Associate MEET JESSIE Jessie is a Civil Engineer with experience in surveying, site design, and construction administration across municipal, recreational, and private development projects. His expertise includes preparing complete plan sets with site layout, grading and drainage, utilities, erosion control, and site preparation. Jessie has continued to expand his work in roadway and site design, utility coordination, and field support, contributing to projects that balance technical precision with practical constructability. EXPERIENCE IN SURVEY, CONSTRUCTION ADMINISTRATION, SITE LAYOUT AND SITE DESIGN PROJECT EXPERIENCE HIGHLIGHTS Wilson Gateway Park, Windsor, CT Civil Engineer Providing construction support for the Town during the construction of a new municipal park. On-site review of the construction progress, techniques, and responded to contractor requests for information. Attended weekly construction meetings to review schedule updates and progress reports. Worked alongside utility representatives to monitor contractor performance. Clover Street Park, Windsor, CT Civil Engineer Providing construction support for the Town during the construction of a new cricket field. Provided drainage design and specifications for the Bid Documents, as well as construction support including design modifications to address unknown conditions. Also provided review of the construction progress, techniques, and responded to contractor requests for information. Attended weekly construction meetings to review schedule updates and progress reports. NARRATIvE / 39
Page 263
Jessie Dupont IV, PE S. Eagleville Green Apartments, Mansfield, CT Civil Engineer Several multi-story apartment buildings and parking lot and drive. Worked on construction administration services and site changes to grading and drainage during the process of construction. Tolland Medical Center, Tolland, CT Civil Engineer New medical building and access drive for a vacant lot. Worked on the layout, grading, drainage, utility, and site preparation plans for a wetland and planning and zoning submission. Williams Street Improvements, Phase II, New London, CT Civil Engineer Street improvement project that includes a redesign of curbing, pavement markings to accommodate bike lanes and parallel parking, sidewalks that allow ADA access, and a redesign of a state route intersection. Led the engineering team in providing the design plans for bidders. Quinebaug Valley Rail Trail, Southbridge, MA Site Engineer, Construction Observer Conversion of an existing railroad bed approximately 7 miles in length into a walking and biking trial with several site changes to allow for ADA access to the trail. Provided daily on-site construction observation and led the construction engineering team in solving changes to plans and tracked progress of work completed for the town for pay requests from the contractor. River Street and Crane Street Improvements, Southbridge, MA Site Engineer, Construction Observer Street improvement project that included replacement of a water main, installation of drainage structures, and new curbing and sidewalk to allow for more efficient ADA access. Provided daily on-site construction observation and led the construction engineering team in resolving plan changes and tracking work completed for contractor pay requests submitted to the town. PRIOR TO JOINING BSC GROUP, JESSIE CONTRIBUTED TO THE FOLLOWING PROJECTS: Springfield Flood Protection System Inspections, Springfield, MA Civil Engineer Inspection of the entire length of the Springfield Flood Protection System and compiled a report of findings and recommendations for repair twice a year. West Grove Street Waterbury Housing Authority, Waterbury, CT Civil Engineer Several multi-story apartment buildings along West Grove Street in Waterbury. Project would include a redesign of the residential street with parking lot and utility coordination with the city. Helped with layout, grading, drainage, and utility plans for this project. Bristol Magnet School, Bristol, CT Civil Engineer Parking lot and drive redesign to an existing middle school with construction of an addition on the building. Performed weekly inspections for erosion and sedimentation control for the construction site while the project was being completed. 40 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP
Page 264
Anticipated Town Support BSC may request assistance from the Granby Department of Public Works to provide equipment and an operator for test pit excavation. ANTICIPATED TOWN SUPPORT / 41
Page 265
42 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP
Page 266
Cost Proposal COST PROPOSAL / 43
Page 267
44 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP
Page 268
Page 7 of 7 AP PENDIX A Cost Proposal N ame of Engineering Firm: ___________________________________________________ Services Needed On-C all Engineering and Related Services Please indicate your firm’s hourly fees over the five-year period of the contract Billing Category Hourly Billing Rate P roject Manager ________________ Chief Engineer ________________ Engineer ________________ Technician Support ________________ Clerical/Researcher ________________ Other ________________ Other Expenses (if applicable): Identify any other categories and costs required to provide Engineering and On-Call services that are not included above: ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ BSC Group, Inc. $285 $225 $165 $140 $110 Direct Expenses will be billed with a 10% markup. Direct Expenses include cost of transportation, shipping/courier service, printing and reprographics, telecommunications, presentation graphics, project supplies, subcontractors, subconsultants and other costs directly applicable to the individual project. Premium rates will apply to overtime hours, night shifts and weekend work if and to the extent allowed by applicable law. All rates are subject to adjustment, typically at the start of each calendar year. (2026)* * BSC reserves the right to apply a 4% increase to these Billing Rates each year for the remainder of this contract. COST PROPOSAL / 45
Page 269
46 / PROFESSIONAL ENGINEERING SERvICES / BSC GROUP
Page 270
Page 271
www.bscgroup.com
Page 272
Town of Granby, Connecticut July 24, 2026 Response to Request for Proposals Professional Engineering Services
Page 273
BETA GROUP, INC. 1010 Wethersfield Avenue, Suite 305, Hartford, CT 06114 P: 844.800.2382 | F: 401.333.9225 | W: www.BETA-Inc.com July 24, 2026 Mr. Mike Walsh, Town Manager Town of Granby 15 North Granby Road Granby, CT 06035 RE: Request for Proposals - Professional Engineering Services Dear Mr. Walsh, BETA Group, Inc. (BETA) is pleased to submit our qualifications in response to the Town of Granby's Request for Proposals for Professional Engineering Services. For more than 40 years, BETA has partnered with municipalities across New England to deliver comprehensive engineering, planning, and environmental consulting services. We appreciate the opportunity to be considered for the Town's five-year on-call contract. We understand that the Town is seeking a responsive and reliable engineering partner capable of supporting a diverse range of municipal capital improvement initiatives. BETA’s multidisciplinary team offers extensive experience providing planning, design, permitting, and construction-phase services for parks and recreation facilities, municipal buildings, transportation infrastructure, water and wastewater systems, and a variety of public works projects. I will serve as Principal in Charge and will have full authority to commit BETA resources to the successful delivery of this contract. Jason Ouimet, PE, LEED AP, will serve as Project Manager and primary point of contact. Backed by the depth of expertise within our Hartford office and firmwide technical staff, our team is well equipped to provide responsive, high-quality engineering services tailored to the Town’s needs. The representative projects included in our submission highlight our experience delivering municipal on-call engineering services throughout Connecticut, including parks and recreation improvements, athletic facilities, roadway and site design, utility infrastructure, environmental permitting, and construction administration for projects similar in scope and complexity to those anticipated under this contract. BETA has no known conflicts of interest that would affect our ability to provide the requested services. Any requested clarifications or exceptions regarding the proposed contract documents are identified separately within our proposal. Thank you for your consideration. We value the opportunity to partner with the Town of Granby and look forward to discussing how BETA's experience, technical expertise, and commitment to client service can help advance the Town's capital improvement goals. Sincerely, BETA GROUP, INC. Najib O Habesch Senior Vice President / Principal in Charge
Page 274
Page 275
1. Company Profile
Page 276
Established in 1982, BETA employs over 170 engineers, planners, scientists, landscape architects, GIS/asset management specialists, construction managers, and support personnel. BETA provides sustainable and innovative consulting solutions. As a New England-based employee-owned firm (ESOP), employees have a vested interest in the success of projects and services to clients. BETA has provided integrated solutions that improve the communities where we live and work for over 40 years. We provide a wide range of services – from planning to analysis to design – for municipalities and agencies throughout New England.
Page 277
BETA’s core values of teamwork, employee ownership, quality, client service, and integrity are at the heart of everything we do and drive us in our mission to improve the communities in which we live and work. Effective communication with our clients is one of BETA’s priorities, and, as such, is a hallmark of our way of practice. We have found that the best approach to maintaining effective communication is to assign a project manager who understands the various aspects of the individual projects and tasks from the client’s perspective. For this contract, Najib Habesch will serve as the principal in charge, and Jason Ouimet will serve as the project manager and primary point of contact. Principal in Charge NHabesch@BETA-Inc.com Project Manager JOuimet@BETA-Inc.com With offices in Lincoln, RI; Boston, Chicopee, Norwood, and Worcester, MA; Hartford, CT; and Manchester, NH, BETA has the capacity and depth of staff to handle both large and small projects. Work performed for this contract will be managed out of our Hartford, CT office with support from other offices.
Page 278
2. Understanding of Services
Page 279
BETA understands that the Town of Granby is seeking a responsive, multidisciplinary engineering partner capable of supporting a diverse range of municipal capital improvement projects through a task-order-based on-call contract. The selected consultant will be expected to provide timely technical expertise across multiple disciplines while adapting to the Town's evolving priorities over the duration of the agreement. Anticipated assignments include improvements to parks and recreational facilities, such as athletic track replacement, baseball and softball field renovations, pickleball courts, and a new year-round restroom facility at Salmon Brook Park, as well as sewer pump maintenance projects and other municipal infrastructure improvements. These projects require coordinated civil, structural, landscape architecture, environmental, traffic, water/wastewater, and construction administration services. BETA's multidisciplinary team is well-positioned to support these assignments from planning and permitting through design, bidding, and construction. Our experience delivering municipal on-call engineering services throughout Connecticut enables us to respond efficiently to individual task orders while providing practical, cost-effective solutions that align with the Town's schedule, budget, and long-term capital improvement goals. BETA’s typical on-call approach is built on clear communication, efficient execution, and responsive service. A typical assignment follows the process illustrated below. BETA has the staff, technical resources, and organizational structure to successfully support the Town of Granby's Engineering On-Call Services contract. With more than 170 professionals across seven New England offices, including our Hartford, Connecticut office, our multidisciplinary team can efficiently respond to concurrent task orders while providing continuity of service. By drawing upon specialists in roadway and site engineering, landscape architecture, traffic engineering, structural engineering, environmental permitting, water and wastewater engineering, and construction administration, we are able to assemble the right team for each assignment. Our experience delivering municipal on-call contracts throughout Connecticut enables us to provide responsive, high-quality services that meet the Town's schedule, budget, and project needs. FINAL WORK PRODUCT
Page 280
3. Relevant Experience
Page 281
BETA has extensive experience planning, designing, and constructing parks and recreation facilities for municipalities and school districts throughout New England. Our portfolio includes park master plans, athletic field renovations, court improvements, playgrounds, trails, restroom facilities, site utilities, drainage, parking, and accessibility improvements. Representative Connecticut projects include Hartford's Keney Park Master Plan and Colt Park Athletic Fields, as well as Martin Park Improvements in East Hartford. In Massachusetts, BETA has completed athletic facility improvements for Natick and Plymouth Public Schools. BETA has successfully delivered multidisciplinary engineering services through numerous municipal on-call contracts, providing responsive support for roadway, site, drainage, utility, permitting, and capital improvement projects. Our long-standing relationships with municipalities, including Hartford, East Hartford, and Enfield, demonstrate our ability to quickly respond to task orders, coordinate with municipal staff, and deliver projects from planning through construction. Our team routinely provides civil, structural, environmental, and water/wastewater engineering services for municipal facilities and infrastructure. This includes site improvements, stormwater management, utility coordination, environmental permitting, sewer pump station improvements, municipal buildings, parking facilities, and construction administration, allowing us to support the diverse engineering needs that arise under an on-call contract.
Page 282
To further demonstrate our qualifications, representative project sheets are included in the Appendix to this submission. These examples highlight BETA's experience delivering municipal on-call engineering services, athletic field and park improvements, recreation planning, and multidisciplinary infrastructure projects and reflect the range of services anticipated under this contract. Representative Project Relevance to Town of Granby Colt Park Athletic Fields Improvements Hartford, CT Demonstrates design and construction of municipal athletic fields, recreational amenities, drainage, and supporting site infrastructure. Goodwin Park Golf Course Irrigation & Booster Pump Hartford, CT Demonstrates multidisciplinary engineering for municipal park infrastructure, including civil, mechanical, electrical, and water system improvements supporting recreational facilities. Keney Park Master Plan Hartford, CT Demonstrates comprehensive park master planning, public engagement, recreation programming, accessibility improvements, sustainability initiatives, and implementation planning for a large municipal park. Engineering On-Call Services Hartford, CT Demonstrates responsive, multidisciplinary engineering services delivered through a municipal on-call contract. Martin Park Improvements East Hartford, CT Illustrates design of park roadway, drainage, parking, ADA improvements, and new athletic court facilities, combining recreation improvements with municipal infrastructure design. Engineering On-Call Services East Hartford, CT Illustrates successful delivery of task-order engineering services for municipal roadway, site, drainage, and infrastructure improvements. Engineering On-Call Services Enfield, CT Highlights ongoing municipal engineering support, permitting, utility coordination, and construction administration under an on-call agreement. High School Athletic Facilities Natick, MA Relevant experience designing athletic fields, track facilities, courts, parking, and associated site improvements High School Athletic Facilities Plymouth, MA Demonstrates planning and design of athletic fields, synthetic track, courts, and recreational site infrastructure. Task-Based Traffic & Safety Engineering Services CTDOT Demonstrates the ability to manage multiple concurrent task assignments using a multidisciplinary team and established project management procedures.
Page 283
4. Team and Key Staff
Page 284
BETA understands that developing the right project team is paramount to a project’s success. The individuals assembled for this contract have the qualifications to successfully undertake the nature of work described within your Request for Proposals. Full resumes for the following team members are included in the Appendix. Najib is the Senior Vice President in charge of the firm’s Hartford, Connecticut, office. In this capacity, he is responsible for cultivating and coordinating the office’s activities using his exceptional leadership, management, and marketing skills. After serving in the public sector for many years, Najib joined the private sector, where his career path took him from working with private developers to designing complex intelligent transportation systems. He demonstrates a keen ability to “get the job done,” even under circumstances where multiple assignments have had to be completed simultaneously. He does so with the utmost professionalism, service to his clients, and quality-based deliveries.
Page 285
Jason is a dedicated Associate with experience working on a wide variety of transportation and land development projects for public and private sector clients in Connecticut and Massachusetts. Jason is thoroughly familiar with the LOTCIP program, having designed recent LOTCIP-funded projects in Groton, East Hartford, Meriden, and West Haven. He also serves as project manager for BETA’s peer reviews of LOTCIP-funded projects administered through the Capital Region Council of Governments. His experience includes highway and roadway design, hydrological and hydraulic analysis and reports, drainage design, stormwater management, utility planning, and site planning. Jason’s background is extensive and varied. It includes rail trail conversions, streetscape improvements, complete streets, interchange improvements, sports complexes, and multimodal transportation facilities. He is focused on producing work efficiently and accurately, staying within budget, and bringing innovative solutions to every job. In his role as Vice President, Jay brings strong expertise in municipal infrastructure design and management, gained from 42 years of experience in both the public and private sectors. He is thoroughly familiar with all aspects of civil, site, utility, roadway engineering, estimating, and construction inspection with an emphasis on project management and contracting methods utilizing local, state, and federal funding. Jay has provided design, construction administration, and management services for numerous public infrastructure improvements throughout his career. He has also been responsible for complete design and/or served as a project/construction manager for more than a dozen Connecticut Department of Transportation projects, specializing in state and municipal arterial, streetscapes, and local road design, pavement management, rehabilitation methods, techniques, construction engineering, administration, and management. Jay has also designed and managed the design and construction of numerous public park projects, athletic fields, and utility improvement projects throughout his career. Kwesi is a Vice President at BETA with over 24 years of experience in transportation engineering across federal, state, local, and private sectors. He brings extensive experience leading multidisciplinary teams, managing complex transportation programs, and serving as project and contract manager for large, multi-year municipal and DOT assignments, consistently delivering projects on time and within budget. Kwesi has successfully partnered with state DOTs, municipalities, and regional agencies to advance roadways, traffic signals, and multimodal improvements, and is known for his collaborative approach, technical oversight, and commitment to client service. He is a licensed Professional Engineer, a Professional Traffic Operations Engineer (PTOE), and a past president of the Connecticut Institute of Transportation Engineers. Laura Krause will provide environmental engineering and permitting support for the contract. With 12 years of experience in environmental consulting and engineering, she specializes in environmental permitting, ecological assessment, wetland delineation, and regulatory compliance for municipal infrastructure projects throughout New England. Laura has supported roadway improvements, bridge replacements, rail trails, and other public works projects, preparing permit applications, wetland replication plans, invasive species control plans, and environmental documentation while coordinating with local, state, and federal regulatory agencies. Her experience helps clients efficiently navigate environmental requirements and maintain project schedules from planning through construction.
Page 286
Joseph McLoughlin will provide environmental site assessment, hazardous materials, and contaminated soil management support for the contract. With 34 years of environmental consulting experience, he specializes in Phase I and II Environmental Site Assessments, site investigations, regulatory compliance, soil management, and remediation for municipal infrastructure projects. As a Connecticut Licensed Environmental Professional, Joe has supported transportation, utility, and redevelopment projects throughout the state, including environmental assessments, hazardous building material investigations, CTDEEP regulatory coordination, and contaminated soil management for public infrastructure improvements. His expertise helps municipalities identify and address environmental constraints while maintaining project schedules and regulatory compliance. Chris has 29 years of experience specializing in structural engineering. Chris is versed in the inspection, design, and construction of a wide range of structure types, including bridges, wastewater treatment structures, industrial buildings, and retaining walls. His project experience has included entirely new structures, as well as both major and minor rehabilitations. His bridge designs range from simple culvert replacements to complex covered bridge rehabilitations. He has conducted peer reviews of contract documents for MassDOT, including structures in Agawam, Buckland, Chesterfield, and Townsend. Additionally, he was the Lead Structural Engineer on MassDOT’s project rebuilding Central Street Bridge in Easton. Randy, a landscape architect and vice president at BETA with over 37 years of experience, has dedicated his career to public-sector projects that enhance communities through thoughtful and innovative design. His expertise includes revitalizing historic downtowns, designing parks and open spaces, improving streetscapes and urban environments, and creating bicycle and pedestrian trail networks that strengthen community connectivity. He is also skilled in school and municipal site design and aesthetic improvements to infrastructure, such as bridges. A hallmark of his work is his ability to engage the public—clearly presenting design concepts, fostering open dialogue, and integrating community feedback into successful, context-sensitive solutions. Christopher Cronin has 36 years of civil and environmental engineering experience delivering municipal infrastructure projects throughout New England. His expertise includes wastewater collection and pumping systems, stormwater infrastructure, utility improvements, construction administration, and facility planning for public-sector clients. Chris has managed projects from planning and design through permitting and construction, coordinating multidisciplinary teams to deliver complex capital improvements on schedule and within budget. His experience supporting municipalities with both utility infrastructure and broader civil engineering projects makes him well-suited to oversee Granby's on-call engineering assignments and provide responsive technical leadership throughout the five-year contract. Danny is a civil engineer with more than 24 years of experience delivering municipal infrastructure, roadway, and streetscape improvement projects throughout Connecticut and Massachusetts. His expertise includes construction engineering and inspection, roadway reconstruction, ADA compliance improvements, drainage design, utility coordination, and multimodal infrastructure enhancements. He
Page 287
has served key roles in complex urban and community-focused transportation projects, providing construction oversight, quality assurance, submittal review, stormwater compliance, and coordination with contractors, municipalities, and residents. He has experience administering projects in accordance with CTDOT procedures and supporting the successful delivery of safety and accessibility improvements, including pedestrian facilities, traffic control systems, and complete streets enhancements. As a licensed Professional Engineer, Danny provides practical, field-oriented leadership and technical oversight to ensure projects are delivered efficiently and safely and aligned with client goals and community needs. Luchs Consulting Engineers (Luchs) was founded in 1980. Luchs specializes in civil, highway, traffic, structural, and utility design, as well as architecture and inspection services. This multidisciplinary structure allows land surveying services to be closely coordinated with planning, engineering, permitting, and construction activities. All surveying assignments are performed by highly skilled technicians under the responsible charge of a licensed Professional Land Surveyor, with a consistent emphasis on accuracy, quality control, and regulatory compliance from project initiation through final deliverables. Luchs provides comprehensive land surveying services essential to the successful coordination of engineers, architects, planners, and inspectors. Services include investigation of utility company records for underground and aerial systems; review of municipal records such as street rights-of-way, Assessor’s Maps, and record drawings; establishment of horizontal and vertical survey control; field surveys of existing utilities, roadways, and surface features; aerial utility mapping; and preparation of topographic surveys in accordance with Connecticut State Agency regulations and municipal standards. When record information is incomplete, the firm coordinates with municipalities to obtain required permits, including Police and Traffic Control, to confirm sewer inverts and pipe sizes. All work utilizes current surveying technology and industry-standard software to deliver accurate, efficient, and reliable survey data in support of project design, environmental review, and construction. Down to Earth Consulting, LLC (DTE) is a Connecticut-based, SBE- and MBE-certified geotechnical consulting firm with over 30 years of regional experience providing geotechnical, geostructural, and geoenvironmental engineering services. Located in Naugatuck, CT, DTE has contributed to hundreds of infrastructure projects throughout the Northeast, including trail systems, flood control infrastructure, pavement design, bridge foundations, and geotechnical instrumentation/monitoring. DTE’s specialized expertise helps identify and resolve complex subsurface challenges early in the design phase, supporting the City’s goals for accelerated delivery and cost efficiency. Their service offerings include the following: Subsurface investigations and laboratory testing Foundation and retaining wall analysis Slope stability evaluations Construction-phase geotechnical observation and reporting Pavement section recommendations
Page 288
DTE’s deep understanding of construction practices and multidisciplinary project environments ensures reliable geotechnical insights that directly support the structural integrity and longevity of municipal transportation infrastructure. Aztech Engineers, Inc. is a Hartford, Connecticut-based consulting engineering firm founded in 1995 that provides mechanical, electrical, plumbing (MEP), fire protection, and lighting design services for public- and private-sector clients throughout the region. The firm's expertise includes the planning and design of building systems, electrical distribution, emergency power, site and roadway lighting, and code-compliant fire protection systems for municipal facilities and infrastructure. Working collaboratively with multidisciplinary design teams, Aztech delivers practical, sustainable, and cost-effective MEP solutions that support parks, public buildings, transportation, and other municipal improvement projects.
Page 289
5. References
Page 290
There is no better benchmark for the quality of services provided by our staff than feedback and testimonials from our clients. BETA is pleased to provide the following list of references for your consideration. Road Engineer Town of Enfield 820 Enfield Street Enfield, CT 06082 860.763.7095 Public Works Services Coordinator City of Groton 295 Meridian Street Groton, CT 06430 860.446.4164 City Engineer City of Hartford 50 Main Street East Hartford, CT 06108 860.291.7380 Executive Coordinator Town of Greenwich 101 Field Point Road Greenwich, CT 06836 203.622.7894 Director of Public Works City of Meriden 142 East Main Street Meriden, CT 06450 203.630.4018 LOTCIP Program Manager CRCOG 350 Church Street, 3rd Floor Hartford, CT 06103 860.724.4220
Page 291
Appendix - Project Sheets
Page 292
Colt Park Athletic Fields and Park Improvements Hartford, Connecticut REFERENCE Frank Dellaripa City Engineer / Assistant Director 50 Jennings Rd. 2nd floor Hartford, Connecticut 06120 860.757.9975 SERVICES PROVIDED • Landscape Architecture • Athletic Field Design • Master Planning • Cost Estimating • Public Outreach • Survey Coordination • Lighting Design Coordination • Historic Resource Planning PROJECT STATUS Ongoing PROJECT BENEFITS 3 Athletic Field Improvements 3 Historic Preservation 3 Accessibility Enhancements 3 Community Engagement 3 Park Connectivity 3 Public Safety Improvements Colt Park is a 106-acre historic urban park listed on the National Register of Historic Places and serves as one of Hartford’s premier recreational and community destinations. Building upon the City’s 2017 Colt Park Master Plan, BETA is assisting the City of Hartford with the planning and design of targeted improvements intended to enhance recreation opportunities, improve accessibility, and preserve the park’s historic character. Working closely with the City of Hartford Department of Public Works, community stakeholders, and a multidisciplinary consultant team, BETA is preparing schematic design and design development plans for a series of park-wide improvements. Key project elements include the design of four athletic fields with synthetic turf, field lighting, drainage improvements, pedestrian and site lighting upgrades, reconstruction of the historic Wethersfield Avenue fence, and enhanced pedestrian connections between the Samuel Colt Monument, athletic facilities, and other park amenities. The project also includes removal of the existing running track, conversion of underutilized areas to active recreation space, coordination with the City’s urban forestry program, and preparation of planning-level construction cost estimates to support future implementation. Through stakeholder engagement, visual simulations, and phased design development, the project seeks to create a safer, more connected, and more resilient park while honoring the historic legacy of one of Hartford’s most iconic public spaces.
Page 293
Goodwin Park Golf Course Irrigation & Booster Pump Hartford, Connecticut REFERENCE Frank Dellaripa, PE City Engineer City of Hartford 50 Jennings Road Hartford, CT 06120 860.757.9975 Frank.Dellaripa@Hartford.gov SERVICES PROVIDED • Mechanical, Electrical, Architectural, and Civil Design PROJECT STATUS Completed 2025 PROJECT COST Design Cost: $97,000 Construction Cost: $4,950,000 PROJECT BENEFITS 3 Improved performance at reduced cost BETA provided professional engineering services to design improvements to the irrigation system and the water supply at the Goodwin Park Golf Course in Hartford, Connecticut. The project included a Systemwide Water Supply Feasibility Study and design of a new irrigation system for the 27-hole golf course to remove it from the existing public water supply system. The project goals were: • Provide an alternative source of water for irrigation of the golf course. • Design a packaged booster pump skid package and appurtenances to automatically pump water from the northern-most pond to the irrigation system located at the golf course. • Prepare the design for instrumentation, monitoring and controls to comply with the existing diversion permit requirements. • Prepare the design for a new irrigation system at the twenty-seven (27) hole golf course. A new booster pump system will provide a more reliable water source and will be capable of providing the water at an increased pressure. With these capabilities, a new booster pump system could exacerbate the current issues with the existing irrigation system. Given that the existing irrigation system is 30 years old, it has reached the typical life expectancy of a system.
Page 294
Keney Park Master Plan Hartford, Connecticut REFERENCE Nasha Rhone Senior Project Manager City of Hartford 50 Jennings Road Hartford, CT 06120 860.757.999 Nasha.Rhone@hartford.gov SERVICES PROVIDED • Master Planning • Community Engagement • Landscape Architecture • Parking Analysis • Civil Engineering • Transportation Planning • Sustainability Solutions • Project Management Oversight • Grant Funding Coordination PROJECT STATUS Ongoing PROJECT COST Total Design Cost $175k Keney Park, designed by Fredrick Law Olmsted in the late 19th century, is Hartford’s largest public park at 692 acres and one of the largest municipal parks in New England. BETA Group, Inc. was retained by the City of Hartford, in partnership with Friends of Keney Park, to prepare a comprehensive master plan guiding the park’s long-term restoration and revitalization. The scope included an existing conditions assessment, historical research, an extensive public engagement process featuring over 25 1x1 stakeholder interviews and 3 public input sessions to shape a shared vision for the park’s future. Building on this input, the master plan establishes a framework for capital improvements, including development of an urban Nature Center, a new performance facility, plans to re-open nearly 200 acres of park that were closed for the past 20 years, development of a multi-modal trail through the park as part of the East Coast Greenway, updgraded recreational amenities (playgrounds, athletic fields, and splashpads), improved accessibility and wayfinding and sustainability initiatives addressing stormwater management and habitat conservation. As part of this effort, BETA also is engaged in schematic design and the development of construction documents for priority projects identified by the community and client. The plan positions Keney Park as a space for vibrant, accessible, and ecologically resilient open space for the surrounding neighborhoods and the greater Hartford region and beyond for generations to come.
Page 295
On-Call Engineering Services Hartford, Connecticut REFERENCE Frank Dellaripa, PE City Engineer City of Hartford 50 Jennings Road Hartford, CT 06120 860.757.9975 SERVICES PROVIDED • Design • Planning • Safety PROJECT STATUS Ongoing PROJECT BENEFITS • Traffic Signal Equipment Assessment • On-Street Parking Assessment • Crosswalk Installation Assessment • Structural Analysis • Bicycle Lane Design The City of Hartford retains BETA under an on-call contract to provide traffic engineering services in support of the Department of Public Works. BETA responds to a wide range of transportation planning, traffic operations, safety, and infrastructure needs, providing timely engineering services to address City priorities and resident concerns. Services have included: • Site plan and traffic study review • Traffic signal corridor retiming • Traffic signal equipment assessment and repair design • Signal plan revisions • Bicycle facility planning and design • Local Road Accident Reduction Program applications • All-way stop sign assessments • Crosswalk installation assessments • Traffic signal warrant analyses • Signal interconnect wiring assessment and repair • On-street parking assessments • School crossing guard safety assessments • Structural analysis for span pole replacements • Bid documents for loop detector testing and replacement • Street design and reconstruction • Public park design • Golf course irrigation • Pond dredging Drawing on this broad range of assignments, BETA has provided responsive engineering support tailored to the City’s evolving priorities. Services have included field investigations, engineering analyses, design development, technical recommendations, and construction-related documentation to help the City implement improvements that enhance transportation safety, mobility, and system performance.
Page 296
Martin Park Improvements East Hartford, Connecticut REFERENCE Douglas Wilson, PE Town Engineer Town of East Hartford 740 Main Street East Hartford, CT 06108 860.291.7380 DWilson@easthartfordct.gov SERVICES PROVIDED • Drainage Investigation • Engineering Design • Roadway & Site Improvements • Athletic Court Layout & Design PROJECT STATUS Ongoing PROJECT COST Design Cost $136,600 PROJECT BENEFITS 3 Improved drainage, roadways, & new athletic court This project consists of the reconstruction or rehabilitation of approximately 3,000’ of the park road in Martin Park, East Hartford, CT along with the conversion of an existing skate park into a hard-surface soccer court (futsal court) with new fencing and parking lot improvements. The improvements include full-depth park road reconstruction or reclamation where applicable, new park road drainage infrastructure (as needed), addressing erosion issues, bituminous curbing where appropriate, ADA compliant vehicle parking improvements, side driveway reconstruction, the removal of pull-off areas, and the installation of new wooden guiderail.
Page 297
On-Call Engineering Services - Development & Implementation of a Road Improvement Program East Hartford, Connecticut REFERENCE Douglas Wilson Town Engineer Engineering Division 740 Main Street East Hartford, CT 06108 860.291.7383 SERVICES PROVIDED • Asset Management • Pavement Evaluation • Capital Improvement Plans • Design • Construction Services • Training Program PROJECT STATUS Ongoing BETA was retained by the Town under an on-call contract to inventory roadway assets, evaluate pavement conditions, develop repair recommendations, prepare construction documents, provide construction phase services, and support implementation of the Town’s road improvement program. Through this ongoing partnership, BETA has provided asset management, roadway design, drainage improvements, capital planning, and staff training to help the Town maintain and improve its transportation infrastructure. Initial assignments included assessments of roadway conditions, pavement markings, guiderails, signage, sidewalks, and curb ramps. BETA utilized its ManageMyRoads Asset Management Platform, integrated with GIS capabilities and ArcGIS Online (AGOL), to collect, manage, and analyze roadway asset data. The platform enables the Town to prioritize repairs, develop a realistic capital improvement plan, and efficiently manage its transportation infrastructure over the long term. Additional assignments included the full-depth reconstruction of Burnham Street and Sherwood Drive to improve pavement conditions and mitigate flooding. Flood mitigation measures included conveying runoff from the north side of Burnham Street to a wetland area on the south side through a series of culverts and implementing stormwater best management practices (BMPs) to reduce peak flows and runoff volumes. BETA also provided engineering design services for roadway improvements on May, Summer, June, and Blinn Streets, including pavement reconstruction, new bituminous concrete curbing, driveway and sidewalk reconstruction, ADA-compliant curb ramps, drainage structures, signage, and pavement markings. As part of the on-call contract, BETA also trained Town staff to use the State of Connecticut’s Vendor-in-Place (VIP) resurfacing contracts. The training program included evaluating roadway suitability for expedited resurfacing, assessing Public Rights-of-Way Accessibility Guidelines (PROWAG) requirements, developing implementation schedules, coordinating utility meetings, documenting project costs, and managing contractor coordination for milling, paving, and pavement marking operations.
Page 298
On-Call Engineering Services Enfield, Connecticut REFERENCE Donald Nunes Director of Public Works Town of Enfield 820 Enfield Street Enfield, CT 06082 860.763.7527 SERVICES PROVIDED • Analysis • Design • Permitting • Construction Services and Inspection PROJECT STATUS Ongoing PROJECT BENEFITS • Stormwater Management • New Sidewalks • Improved Roadway Infrastructure BETA provides on-call engineering services to the Town of Enfield, including design, permitting, and construction phase services. Through this ongoing contract, BETA has completed multiple concurrent roadway reconstruction and drainage improvement assignments, including: Thompsonville Northeast Road Reconstruction This project involved full-depth reconstruction of approximately 10,520 linear feet of roadway on Dover Road, Eleanor Road, Foxcroft Road, Freemont Road, Leonard Road, and Montana Road. Improvements also included replacement of sidewalks, storm drainage, and curbing. Thompsonville Southwest Road Reconstruction This project involved design and construction inspection for the full-depth reconstruction of approximately 5,600 linear feet of roadway on Spring Street, Cross Street, South Street, Pease Street, and Maple Avenue. Improvements included replacement of the roadway, sidewalks, driveways, storm drainage, and curbing. Saint James West Reconstruction BETA provided construction inspection services for the full-depth reconstruction of approximately 10,369 linear feet of roadway and installation of storm drainage on Carmela Terrace, Ganny Terrace, Joan Drive, Marshal Drive, and Saint James Street. Drainage analyses identified deficiencies in the existing storm drainage system for the 25-year storm event and informed design modifications to increase system capacity, control gutter flow, and reduce ponding. The team also assisted the Town in obtaining an Inland Wetlands and Watercourses Act permit and prepared a Connecticut Department of Energy and Environmental Protection (CT DEEP) General Permit application for the Discharge of Stormwater and Dewatering Wastewaters Associated with Construction Activities.
Page 299
Natick High School - Sports Facilities Natick, Massachusetts REFERENCE Tim Collins Natick Athletic Director 15 West Street Natick, MA 01760 508.647.6607 SERVICES PROVIDED • Design • Planning • Construction Documents PROJECT STATUS Completed The site design for the athletic facilities includes two ball-fields complete with back- stops, bleachers, and bench dugouts with a multi-use field in natural turf and several tennis courts along with two basketball courts. These facilities are located together on the north side of the school property overlooking Dug Pond. A synthetic turf football field and a synthetic track has also been designed and constructed for the school on property just south of the main campus.
Page 300
Plymouth North High School Plymouth, Massachusetts REFERENCE Kathleen McSweeney, Principal Plymouth North High School 41 Obery Street Plymouth, MA 02360 508.830.4400 SERVICES PROVIDED • Concept Design • Rain Garden Design • Construction Documents PROJECT STATUS Completed PROJECT COST Total Construction Cost $4.9m BETA worked on the design team to create plans for a new high school as a part of Massachusetts Model School Program. The site design includes rain gardens, entry plazas, and a courtyard. Recreational facilities include tennis courts, a track, a synthetic football/ multi-use field, and two synthetic baseball fields. The school opened for its first year in the fall of 2012 and the site work was completed in 2013.
Page 301
Task Based Traffic & Safety Engineering Services Connecticut Department of Transportation BETA was selected by the Connecticut Department of Transportation (CTDOT) in 2014, 2017, and again in 2021 to provide task-based traffic and safety engineering services in support of the Division of Traffic Engineering. Through these contracts, BETA has completed and continues to perform a wide range of traffic engineering and safety improvement assignments, including: Computerized Traffic Signal System Replacements SPN 0170-0197 US Route 1 CTSS Replacement, Bristol - 10 Signals SPN 0131-0213 CT Route 10 CTSS Replacement, Southington - 9 Signals SPN 0153-0164 CT Route 85 CTSS Replacement, Waterford - 10 Signals These projects were initiated to replace aging traffic signal infrastructure on signalized corridors as part of CTDOT’s state of good repair program by installing new traffic signal equipment and replacing the existing Computerized Traffic Signal System (CTSS) communications. Projects included full replacement of traffic signal equipment and new fiber optic interconnect, as well as partial signal upgrades at intersections. The replacement of the CTSS communications system establishes reliable fiber optic communication between signalized intersections, with wireless communications to CTDOT’s Newington Administration Building, enabling implementation of advanced technologies to monitor traffic and reduce travel times. Specifically, the CTSS components included: • Advanced traffic signal controllers to provide updated traffic signal and data collection functionality. • Fiber optic interconnect among all project intersections to provide reliable, high bandwidth communications. • Upgraded wireless communications back to the CTDOT’s central traffic signal control software. The projects followed the 2021 Stewardship & Oversight Implementation Manual for ITS projects and statewide/ regional architecture requirements in accordance with 23 CFR 940.01-13, including a systems engineering analysis commensurate with the project scope and technology. Clearance Interval Retiming SPN 173-454PL - District 3 (3/2015 - 7/2017) 684 Signals SPN 172-440PL - District 2 (10/2015 - 11/2017) 435 Signals These tasks were initiated to reduce the number of severe crashes at signalized intersections. BETA retimed yellow, all-red, and pedestrian clearance intervals and updated pre-emption settings at state-owned and maintained traffic control signals in Districts 2 and 3. The tasks also included updating signal systems, coordinating yellow clearance times within closed-loop systems, and revising technical notes. BETA prepared updated signal plans and Timing and Maintenance forms for each modified traffic signal. Road Diet Feasibility Study on Local Roads, SPN 170-3584 (Completed 2022) This task evaluated the feasibility of implementing road diets on select municipally owned multilane undivided arterials to reduce crashes, improve traffic operations, and enhance bicycle and pedestrian accommodations. The project was conducted in three phases: data acquisition and initial screening, traffic modeling and analysis, and conceptual plan development. Inventory and Upgrade of Municipally-Owned Traffic Control Signals, SPN 170-3585 (Completed 2023) BETA conducted field and desktop reviews of up to 2,500 municipally owned traffic signals throughout Districts 1, 2, 3, and 4. The team compiled a GIS inventory of existing traffic signal equipment and developed recommendations for safety improvements, including dilemma zone detection, accessible pedestrian signals, retroreflective borders on backplates, and leading pedestrian intervals. Rectangular Rapid Flashing Beacons on Local Roads, SPN 171-0468, SPN 172-0505, SPN 173-0516, SPN 174-0447 (Completed 2025) This task involved designing rectangular rapid flashing beacons (RRFBs), PROWAG-compliant curb ramps, and associated signing and pavement markings at mid-block crossings on municipally owned roads throughout Districts 1, 2, 3, and 4 to improve pedestrian safety. REFERENCE Natasha Fatu, PE State Safety Engineer CT Department of Transportation 2800 Berlin Turnpike Newington, CT 06111 860.594.2731 PROJECT STATUS Ongoing
Page 302
Appendix - Staff Resumes
Page 303
2026 | Najib O. Habesch | Page 1 Najib O. Habesch is a seasoned civil and transportation engineer whose career spans over 40 years of public- and private-sector leadership in the planning, design, and delivery of complex infrastructure projects across Connecticut. As Senior Vice President at BETA Group, Inc., Najib leads the firm’s operations in Connecticut and has played a central role in transforming urban environments through smart, community-centered engineering solutions. Najib’s project portfolio includes some of the region’s most innovative and award-winning transportation and streetscape initiatives. Najib serves as principal-in-charge of task-based traffic and safety engineering work for the Connecticut Department of Transportation (CTDOT). This includes road safety audits, crash data analysis, operational improvements, and concept development for statewide high-priority corridors—supporting CTDOT’s Vision Zero and Highway Safety Improvement Program (HSIP) initiatives. He also oversees CTDOT ADA Title II Municipal Support Services, helping cities and towns meet federal accessibility requirements by providing technical assistance, compliance assessments, and transition plan development. Oversight of technical assistance and compliance support for Connecticut municipalities under ADA Title II. Services include accessibility assessments and transition plan development to help communities meet federal requirements. Directed numerous traffic and safety planning efforts across Connecticut, including traffic calming master plans, traffic signal optimization, and modern roundabout design for municipalities. Led the design and implementation of the Bushnell Park North Complete Streets Project, a transformative urban streetscape initiative reconnecting Bushnell Park to downtown Hartford. The project included multimodal transportation improvements, pedestrian-focused design, integrated green infrastructure, and traffic calming elements that enhanced access, safety, and sustainability. Through strategic design and stakeholder engagement, the project supported downtown revitalization goals and received national recognition for its innovative, context- sensitive approach to urban mobility and public space. Principal-in-charge for statewide traffic and safety assignments supporting CTDOT's Vision Zero and HSIP initiatives. Responsibilities include road safety audits, crash data analysis, corridor operations improvements, and conceptual design for high- priority locations. Transportation BETA: Since 2011 Total: Since 1983 BS, Civil Engineering – University of Maryland (1983) FHWA Using the National ITS Architecture for Deployment FHWA Synchro & SimTraffic UCONN CTI Context Sensitive Solutions FHWA Systems Engineering for Advanced Transportation Council of Minority Transportation Officials Intelligent Transportation Society of Connecticut – Past President Institute of Transportation Engineers Connecticut Construction Institute American Society of Civil Engineers American Public Works Association
Page 304
2026 | Najib O. Habesch | Page 2 Managed transportation and infrastructure planning for Hartford’s minor league stadium, balancing stadium access with neighborhood traffic circulation and multimodal needs. Oversaw the design and implementation of advanced traffic signal technologies to optimize operations along a high- volume arterial corridor. Developed infrastructure readiness and economic development strategies for Connecticut’s deepwater ports, advancing long-term multimodal logistics and waterfront revitalization efforts. Led an intermodal access and feasibility study for locating a high-speed ferry terminal in Stamford, evaluating site suitability and transportation connections.
Page 305
2026 | Jason Ouimet, PE, LEED AP | Page 1 Jason Ouimet is a dedicated Associate with experience working on a wide variety of transportation and land development projects throughout Connecticut and Massachusetts. He excels both working independently and as part of a team, including in supervisory roles, and is committed to delivering efficient, accurate, and innovative solutions while staying within budget. His experience includes roadway and intersection design, streetscape improvements, multimodal transportation facility design, hydrologic and hydraulic drainage design, drainage best management practices, and site planning and design. Performed reviews of 30%, 70%, and 90% design submissions, construction documents, and cost estimates prepared by design consultants for various CRCOG member town projects. Reviews focused on compliance with local, CTDOT, and AASHTO standards, constructability, and overall quality control. Design project manager for the reconstruction of Burnham Street and Sherwood Drive. The town-funded project involved full-depth reconstruction of approximately 4,600 feet of roadway, including raising sections of Burnham Street, upsizing culverts and drainage infrastructure for flood mitigation, and installing textured flush and raised median islands to reduce vehicle speeds. The project also required various ROW easements and environmental permits within East Hartford and South Windsor. Design project manager for roadway safety improvements along Upland Street, Burdick Street, and Belltown Road adjacent to Barrett Park in Stamford. The project, funded through a community connectivity grant, included new sidewalks, ADA- compliant ramps, raised crosswalks, a median island, bump-outs, bicycle lanes/sharrows, drainage improvements, decorative sidewalks and lighting, signage, and landscaping. Senior project engineer for the design of 3,000 LF of new streetscape improvements along Farmington Avenue, an arterial roadway. Design elements included traffic signals, bike lanes, on-street parking, bump-outs, raised crosswalks, bus stops with shelters, textured medians, decorative sidewalks and lighting, drainage improvements, signage, landscaping, and ROW coordination. Estimated construction value: $10 million. Transportation & Traffic Engineering BETA: Since 2019 Total: Since 2005 BS, Civil Engineering – University of Connecticut (2005) PE – CT #0031242 PE – MA #48699 PE – RI # 13249 LEED AP AutoCAD Civil 3D MicroStation Storm CAD Hydro CAD
Page 306
2026 | Jason Ouimet, PE, LEED AP | Page 2 Design project manager for the reconstruction of May, Summer, June, and Blinn Streets. The town-funded project involved full-depth reconstruction of approximately 1,500 feet of roadway, including construction of new driveways, sidewalks, ADA-compliant ramps, curbing, signage, pavement markings, and roadway drainage improvements. Design project manager for the reconstruction of Poquonnock Road. The LOTCIP-funded project involved full-depth reconstruction of approximately 3,000 feet of roadway and included replacement of existing concrete sidewalks, curbs, pedestrian ramps, and minor stormwater infrastructure. – Senior project engineer for the design of pedestrian improvements along Route 7 and Aspetuck Avenue. The project, funded through the Transportation Alternatives (TA) Program, included closing sidewalk gaps, extending the pedestrian network, ADA-compliant ramps, a new pedestrian bridge over an existing stream, improvements to three traffic signals, bus stops with shelters, landscaping, signage, and drainage improvements. Project manager for the design of a 10-foot-wide multi-use path along Albany Avenue (Route 44) in Hartford. The project spans approximately 3,000 feet between Bloomfield Avenue and Westbourne Parkway, with most of the corridor adjacent to The Village for Families and Children. The multi-use path crosses three signalized intersections and two bridges. Improvements included replacing an existing 5-foot sidewalk with a 10-foot-wide multi-use path, ADA enhancements, traffic signal modifications, new and modified lighting, landscaping, grading, and improved access to transit and nearby housing developments. Senior project engineer for the reconstruction of 800 LF of Strawberry Hill Avenue and 870 LF of Fifth Street. The project included replacement of the existing traffic signal and mill-and-overlay resurfacing of the roadway, with roadway widening along sections of Fifth Street. Improvements along Strawberry Hill Avenue included shifting a portion of the roadway five feet to improve vehicle and pedestrian safety at the intersection, including areas of full-depth reclamation and full-depth reconstruction. Additional improvements included replacement and installation of concrete sidewalks, curbs, ADA-compliant pedestrian ramps, utility pole relocations, minor drainage infrastructure, pavement markings, high-visibility crosswalks, signage, and installation of a rapid rectangular flashing beacon (RRFB) along Fifth Street. Design project manager for the reconstruction of Waller Road. The project involved full-depth reconstruction and reclamation of approximately 750 feet of roadway and included replacement of existing curbs, partial driveway reconstruction, roadway widening, large tree removal, new drainage pipes and structures, utility pole relocations, and pavement markings. Senior civil engineer during the final design phase of the project. Project elements included an urban boulevard with an at-grade intersection at Orange Street, improvements to pedestrian corridors, sidewalks, ADA-compliant ramps, protected bike lanes, and drainage and utility improvements. Assisted with drainage design and preparation of a drainage report evaluating methods to alleviate frequent flooding within the corridor, as well as maintenance and protection of traffic during construction.
Page 307
2026 | John Bertoli, LEED AP | Page 1 As Vice President, John “Jay” Bertoli brings more than 40 years of municipal infrastructure design and management experience gained in both the public and private sectors. He is thoroughly familiar with all aspects of civil, site, utility, roadway engineering, estimating, and construction inspection with an emphasis on project management and contracting methods. Jay has performed design, construction administration, and management services on a multitude of public infrastructure improvements over his career. He has also been responsible for the complete design and/or served as a project/construction manager for more than a dozen Connecticut Department of Transportation projects during his career, specializing in state and municipal arterial, streetscapes, and local road design, pavement management, rehabilitation methods and techniques, construction engineering, administration, and management. Jay has also designed and managed the construction of numerous public park projects, athletic fields, and related projects over his career. Project manager and construction coordinator for approximately 3,000 LF of streetscape improvements on an arterial street with an ADT of more than 14,000 vehicles per day. The project has an estimated construction value of $9,500,000 and includes three (3) signalized intersections and right-of-way activities. Responsibilities included multi-agency coordination, utility coordination, oversight of inspection staff, scheduling, claims, and risk analysis. Construction coordinator overseeing inspection staff for various municipal roadway reconstruction projects. Responsibilities include staff supervision, ensuring compliance with Town requirements, field meetings, resolving issues, and client meetings. Project manager and construction coordinator for the design and construction of improvements to the interior of Bushnell Park, including illumination, drainage, and sidewalk construction. Responsibilities included design, scheduling, construction oversight, field oversight, negotiating extra work, coordination with stakeholders, agencies, and utilities. Construction value was $5,000,000. Construction manager/coordinator for improvements to the 27-hole golf course, including irrigation, pump station, bedrock wells, SCADA, permitting, drainage, and related construction. Responsibilities included field oversight, scheduling, construction oversight, negotiating extra work, verification of pay applications, record keeping, coordination with stakeholders, agencies, and utilities. Construction value was $5,000,000. Civil/Site/Transportation BETA: Since 2011 Total: Since 1984 BS, Civil Engineering - Roger Williams University (1984) LEED AP American Public Works Association, Associate Member Intelligent Transportation Society (ITS) of Connecticut, Former Director of Membership
Page 308
2026 | John Bertoli, LEED AP | Page 2 Construction manager/coordinator for improvements to the 18-hole golf course, including cart paths, drainage, and related construction. Responsibilities included scheduling, construction oversight, negotiating extra work, verification of pay applications, record keeping, coordination with stakeholders, agencies, and utilities. Construction value is $1,750,000. Project/construction manager for 4,000 LF of complete street improvements around the perimeter of Bushnell Park. The project was funded by an FTA grant. Responsibilities included construction oversight, coordination, field oversight, staff supervision, and administrative services. The construction value was $11,600,000. Project/construction manager for the design of sidewalk improvements for 5,000 LF of street, including ADA improvements and utility coordination. Provided construction oversight and administration services. Construction value was $2,200,000. Project manager for design of roadway safety improvements, including landscaping, illumination, and drainage improvements. Project value $1,500,000. Project/construction manager for a single-lane roundabout at Park Terrace and Sigourney Streets, providing construction oversight and administrative services. The construction value was $2,500,000. Project/construction manager for the design of intersection safety improvements for 2 signalized intersections in downtown Hartford. Construction value was $1,500,000. Project/construction manager for the design and construction of street relocations and related improvements necessary to construct a new $44,000,000 minor league AA ballpark (Yard Goats) in downtown Hartford. Construction value was $7,800,000. Project manager for road reconstruction with curbing, sidewalks, median islands, landscaping, and minor drainage improvements. The project value was $350,000. Project/construction manager for the design and relocation of domestic water, sanitary, and storm sewer utilities for the construction of a new minor league baseball stadium in downtown Hartford. Construction value was $1,000,000. Project manager for the design of 5,800 LF of primary arterial roadway and streetscape improvements, including pavement design, traffic signal design of 10 intersections, drainage improvements, traffic calming, MPT, and rights of way activities.
Page 309
2026 | Kwesi Brown, PE, PTOE | Page 1 Kwesi Brown, PE, PTOE, is an accomplished traffic and transportation engineering leader with over two decades of experience delivering complex infrastructure projects, leading multidisciplinary teams, and driving business growth across public and private sectors. Known for his strategic leadership and technical expertise in traffic engineering, multimodal planning, and safety-focused design, he has successfully managed multimillion-dollar programs, strengthened client partnerships, and mentored high-performing teams. As Vice President at BETA, Kwesi brings a strong track record of operational excellence, innovation, and industry leadership to support the continued growth and advancement of the firm’s transportation practice. Contract Manager for a five-year $10 million contract to provide Traffic and Safety Engineering services to the Connecticut Department of Transportation. The contract involves assisting the Department on various traffic and safety-related planning and design assignments/projects statewide. Planning tasks include traffic counts, data collection associated with traffic signals, capacity and queuing analysis, and crash analyses, as well as safety and accessibility studies. Design tasks include design of traffic signals and computerized traffic signal systems, Accessible Pedestrian Signals (APS) and Rectangular Rapid Flashing Beacons (RRFBs) complete streets and ADA design, highway and expressway signing design, railroad- highway at grade crossing designs and preparation of maintenance and protection of traffic plans. Construction phase tasks include design services during construction and submittal reviews. Assignments to date include traffic and pedestrian signal, and ADA upgrades at over 50 intersections statewide. Project Manager for this project to replace existing traffic control signals at 10 intersections on US Route 6. The traffic signal replacement project includes the upgrade of the existing infrastructure to the latest standards, such as mast arms/span poles, signal head placement, upgraded signage, detection, accessible pedestrian signals (APS) with pushbuttons and countdown signal heads. The project also includes the installation of underground fiber optic interconnect between the signals with wireless communication to the CTDOT Traffic Operations center. The project also includes construction/reconstruction of curb ramps, blended transitions, sidewalk extensions, landing areas, detectable warning surfaces, realignment of skewed crosswalk pavement markings and associated adjustments to stop bars and detector locations, review of signal timings (including clearance intervals, pedestrian timings, and coordination information where applicable), and evaluation of any existing “When Flashing Stop Ahead” signs tied to a traffic signal or other signs with flashers on approaches to the traffic signal. Furthermore, pavement markings will be updated as necessary, and potential guide rail revisions Traffic Engineering BETA: Since 2026 Total: Since 2000 MS, Civil Engineering, University of Connecticut (2024) BS, Civil Engineering, University of Science & Technology, Ghana (2000) Professional Engineer, CT Professional Traffic Operations Engineer Connecticut Institute of Transportation Engineers – Past President Intelligent Transportation Society of Connecticut American Council of Engineering Companies – CT Chapter
Page 310
2026 | Kwesi Brown, PE, PTOE | Page 2 in conjunction with the installation of new mast arms, span poles, or pedestals implemented. The project is currently in design. Project Manager for this project to replace existing traffic control signals at 9 intersections on Route 10 in Southington. The traffic signal replacement project includes the upgrade of the existing infrastructure to the latest standards, such as mast arms/span poles, signal head placement, upgraded signage, detection, accessible pedestrian signals (APS) with pushbuttons and countdown signal heads. The project also includes the installation of fiber optic interconnect between the signals with wireless communication to the CTDOT Traffic Operations center. The project also includes construction/reconstruction of curb ramps, blended transitions, sidewalk extensions, landing areas, detectable warning surfaces, realignment of skewed crosswalk pavement markings and associated adjustments to stop bars and detector locations, review of signal timings (including clearance intervals, pedestrian timings, and coordination information where applicable), and evaluation of any existing “When Flashing Stop Ahead” signs tied to a traffic signal or other signs with flashers on approaches to the traffic signal. Served as Project Manager for this project to replace existing traffic control signals at 14 intersections on State roads in 9 towns. The traffic project included the new mast arms/span poles, signal heads with backplates, upgraded signage, video and radar detection, accessible pedestrian signals (APS) with pushbuttons and countdown heads. The project also included ADA sidewalk and ramp improvements. Bid phase support and Design Services during Construction (DSDC) were provided including submittals reviews, RFIs, mast arm working drawing reviews and change orders. The project is currently in the construction phase. Project Manager for this study to convert downtown streets including Chapel Street, George Street, York Street and Church Street from one-way to two-way. The study involved extensive data collection and traffic analysis to determine the impact of future traffic diversions and redistribution due to the two-way conversion. Additionally, two-way roadway improvement concepts were developed and refined in concert with the public and project stakeholders into preferred multi-modal concepts. The plans were advanced to preliminary design with associated cost estimates were developed. Project Manager for the design of pedestrian improvements along Summer Street in downtown Stamford at four key intersections: Hoyt Street, North Street, Broad Street, and Main Street. Improvements provide increased pedestrian visibility to motorists, provide larger areas of refuge at intersection corners, and reduce the traveled distance within crosswalks. The project designs included new accessible pedestrian signals, reconstruction of intersection corners and sidewalk ramps to comply with federal Americans with Disabilities Act requirements, installation of new curb geometry for “bump-outs”, streetscape architectural materials, colored thermoplastic crosswalks, and modifications to existing drainage. Project Manager for the $2.8 million signalization and roadway safety improvement project on Route 177 in Farmington, CT. The project involved the upgrade of three traffic signals and roadway improvements at the intersections of South Main Street (Route 177) at New Britain Avenue, Mill Street, and Route 4, as well as the formalization of a mid-block crossing at the intersection of Route 177 at the Farmington River Trail with the installation of a Rectangular Rapid Flashing Beacon. Other tasks included preparing construction drawings and specifications, providing bid assistance, and providing construction administration services. This project involved extensive coordination with the Town and the Connecticut Department of Transportation.
Page 311
2026 | Laura Krause | Page 1 Laura contributes her comprehensive training in physical sciences, GIS mapping, and regulations to varying types of environmental consulting and planning projects. She has been working in the environmental consulting and engineering field and has gained valuable knowledge in ecology, environmental permitting and planning, and hazardous waste assessment in Massachusetts. Her diverse background in environmental consulting allows her to evaluate sites from many perspectives. With 13 years of experience working as an environmental professional, Laura has played a key role in providing wetland delineation and permitting services on dozens of projects for both public and private entities. She has permitted over a dozen transportation-related projects ranging from roadway improvements and bridge replacements to rail trails. Laura’s strong background in the regulations governing development and redevelopment under local, state, and federal jurisdiction allows her to handle a variety of projects efficiently and successfully. Laura is also experienced in Invasive Plant Identification and Management, Geographic Information Systems (GIS), and Wetland Replication Implementation. She has prepared dozens of Invasive Species Control Plans; provided design guidance to developers using maps depicting areas of jurisdiction under local, state, and federal law; and prepared wetland replication plans in accordance with federal, state, and local regulations. Environmental Permitting Manager for the MassDOT Route 20 Reconstruction design/build project in Charlton and Oxford, Massachusetts, which included reconstruction of multiple intersections, a one-acre wetland replication area, two bridge replacements, four culvert replacements, and safety improvements. Provided technical review of permit amendments/applications associated with design changes and reviewed design plans for conformance with regulatory requirements. Environmental Permitting Manager and Environmental Compliance Manager overseeing environmental permitting and compliance in support of the MassDOT Route 125 Basiliere Bridge Replacement Design/Build Project in Haverhill, Massachusetts. Provided technical review of permit amendments/applications associated with design changes and reviewed design plans for conformance with regulatory requirements. These permits included amended USCG Bridge Permit, Section 404 and 408 permit from USACE, Section 401 Water Quality Certification, and a Conservation and Management Permit from the Division of Marine Fisheries. Continuing to provide oversight during progress meetings to document pre- construction compliance items. Environmental Services BETA: Since 2018 Total: Since 2013 MS, Env. Engineering – WPI (2026) BS, Chemistry - Reed College, (2013) Certificate in GIS – Pace University Certificate in Invasive Plant Management – UMass OSHA 40 Hour HAZWOPER Training and 8 Hour Annual Refresher Courses Stormwater Management Courses – UNH Soil Science Certificate - UNH NAACC Lead Observer and L1 Coordinator EPA CGP Inspector Certification Massachusetts Association of Conservation Commissions Licensed Site Professional Association (LSPA) American Chemical Society (ACS) Association of Massachusetts Wetland Scientists Society of Wetland Scientists WTS - Boston
Page 312
2026 | Laura Krause | Page 2 Lead scientist and project manager overseeing permit compliance for a Design/Build Project during construction of the I- 495 Bridges over the Merrimack River at the Haverhill and Methuen municipal boundary. As an Environmental Monitor on this project, provides reviews of contractor-submitted documents, coordinates and oversees permit amendments during the Design/Build phase, conducts regular Site inspections to document field conditions, and identifies action items for environmental compliance, as well as prepares/reviews compliance reports. Oversaw the preparation of an Environmental Assessment to demonstrate compliance with NEPA for the proposed reuse of the former Uniroyal facility in Chicopee that involves filling and grading along a USACE-controlled flood control structure. Developed narrative descriptions of regulatory compliance, site conditions, and anticipated permitting, and drafted a Finding of No Significant Impact for USACE concurrence. Assisted concurrently with the development of a Section 408 permit application to USACE. Lead scientist responsible for providing ecological and environmental services in support of the MassDOT Route 44 Reconstruction Project in Taunton, Massachusetts, which included adding a new travel lane in each direction, bus stop, and bicycle/pedestrian infrastructure. Provided resource area identification and delineation of the onsite wetlands and Bank and prepared/submitted documents for review under the Massachusetts Wetlands Protection Act, including preparation of the Notice of Intent filing and Detailed Wildlife Habitat Evaluation due to the proposed impacts to BLSF and Bank. Represented MassDOT during the NOI public hearing and assisted MassDOT in receiving a Superseding Order of Conditions from MassDEP through the preparation of a Riverfront Area Restoration Plan. Currently serving as the lead scientist and project manager overseeing permit compliance during construction. Prime contributor in preparing environmental review documents and permitting applications for the Route 79/Davol Street Corridor Improvement Project. Developed comprehensive environmental documentation, including an Individual Categorical Exclusion under NEPA, various permits and certifications, and an Environmental Notification Form under MEPA. Defined coastal resource boundaries, conducted sediment sampling, and prepared environmental contract specifications. Presented the project's environmental impacts and requirements at multiple public and regulatory meetings. Prepared environmental specifications, reviewed contractor submittals, and coordinated permit amendments during the Design/Build phase. Participated in a team identifying and delineating wetland resources for a proposed shared-use trail. Defined boundaries of Bordering Vegetated Wetland, Bank, and Mean Annual High-Water using the US Army Corps of Engineers guidelines. Conducted a Detailed Wildlife Habitat Evaluation per Massachusetts inland wetlands guidance. Led the preparation of environmental permitting applications, including those for the US Army Corps of Engineers General Permit, Section 401 Water Quality Certification, and various Massachusetts state environmental regulations. Prepared a Notice of Intent under the MA Wetlands Protection Act for repairing an existing spur connecting to the MBTA's new maintenance facility. Prepared the Stormwater Pollution Prevention Plan (SWPPP) and electronic Notice of Intent for NPDES Construction General Permit coverage. Reviewed previous delineations of resource area boundaries and conducted construction monitoring to ensure compliance with the Order of Conditions and SWPPP. Lead scientist in completing SWPPP compliance inspections and reporting, as well as senior scientist on permit closure documentation. Prime contributor to the environmental permitting team for the Beaver Street Bridge replacement in Framingham, MA. Conducted resource area delineation to support project design. Prepared permit applications under the Massachusetts Wetlands Protection Act and Section 404 of the Clean Waters Act.
Page 313
2026 | Joseph R. McLoughlin II, LSP, LEP | Page 1 Joe has 34 years of experience in the environmental consulting field, providing a wide range of environmental services to clients across New England. He directs a diverse staff of scientists, engineers, and risk assessors conducting environmental assessments, site remediation, brownfields assessments, soil management, regulatory compliance, and indoor air quality assessments. Project manager for Phase I, II, and III Environmental Site Assessment at an approximately 14-acre former tobacco farm. Prepared and submitted filings to the Connecticut Department of Energy and Environmental Protection under the Voluntary Cleanup Program. Oversaw the excavation and on- and off-site management of pesticide, lead, and petroleum-impacted soil. Conducted numerous Phase I Environmental Site Assessments and Limited Subsurface Investigations on City-owned properties and properties targeted for acquisition. Rendered Licensed Environmental Professional (LEP) opinions on the applicability of the CTDEEP Transfer Act. Oversaw numerous Hazardous Building Material Investigations on buildings slated for demolition and redevelopment. Providing soil management services for the City’s Bushnell Park North project. Oversaw the design and implementation of a Sampling and Analysis Plan for several miles of a sewer separation project. Managed the advancement of soil borings, installation of monitoring wells, and collection and laboratory analysis of soil and groundwater samples. Prepared an Environmental Data Report summarizing findings, conclusions, and recommendations and prepared specifications for the handling and management of contaminated and polluted soil and groundwater. Project manager for groundwater pump and treat and free product removal system. Oversaw quarterly groundwater monitoring and operations and maintenance of remedial system and bi-weekly Rhode Island Pollution Discharge Elimination System (RIPDES) monitoring with quarterly reporting to RIDEM. Designed and installed a modified groundwater treatment system including groundwater depression pumps, Spill Buster product recovery units, and treatment shed modifications. Served as a Licensed Site Professional overseeing Utility-related Abatement Measures (URAMs) for projects including Concord Street, Downtown Utilities, Grant/Pond, Union Avenue, Speen Street, Worcester Road Pump Station, and Prospect Street. Conducted preliminary environmental assessments for numerous utility projects and assisted the Town in developing its in-house Waste Management Policy and asbestos policy. Provided Licensed Site Professional services in response Environmental Services BETA: Since 2004 Total: Since 1992 MS, Water Resources, Stanford University (1992) BS, Civil Engineering – Worcester Polytechnic Institute (1991) OSHA 40 – Hazardous Waste Operations (1993) OSHA 8 – Hazardous Waste Operations (2023) OSHA 8 – Asbestos-Cement Pipe Worker Safety Licensed Site Professional, MA #2039 Licensed Environmental Professional, CT
Page 314
2026 | Joseph R. McLoughlin II, LSP, LEP | Page 2 to a hydraulic fluid spill from a Town-owned trash truck and oversaw the management and disposal of asbestos- containing soil and pipe. Acted as Licensed Site Professional for several Brownfields properties owned by the City and responded to an Administrative Consent Order related to violations of an Activity and Use Limitation. Prepared Phase I Initial Site Investigations (ISIs) and Tier Classifications for multiple City-owned properties, conducted annual Temporary Solution monitoring and reporting for the Taunton DPW facility, and provided underground storage tank inventory and compliance assistance. Also oversaw numerous Utility-related Abatement Measures (URAMs) as part of city-wide sewer improvement projects. Served as Lead Qualified Environmental Professional for the implementation of a $300,000 Brownfields Assessment Grant. Conducted four ASTM- and AAI-compliant Phase I Environmental Site Assessments and five Phase II Environmental Site Assessments, and prepared two Remedial Plans. Assisted with oversight and reporting for all aspects of grant management and helped leverage initial assessments into additional funding for Brownfield sites in Winchendon, Lunenburg, and Groton. Assisted Town of Winchendon in obtaining and implementing $450,000 grant from MassDevelopment for environmental and LSP services at a former foundry that is being redeveloped into a brewery. Provided LSP services for the Town of Groton in follow-up work after EPA implemented a $2,000,000 removal action to address imminent hazards associated with lead in soil found during our MRPC assessment work. Provided LSP services for the Town of Lunenburg to follow up after EPA conducted a $200,000 Targeted Brownfield Assessment at a property initially assessed during our MRPC assessment work. Provided Licensed Site Professional services to assess and develop a remediation plan addressing Imminent Hazard arsenic levels in soil at the Pirone Park playground. Developed bid specifications for soil excavation and disposal and oversaw the implementation of an Immediate Response Action (IRA) with the selected contractor. BETA’s Landscape Architecture group subsequently designed and specified a new playground to replace the existing one. Oversaw the implementation of Brownfields investigations at petroleum and hazardous materials sites under a U.S. EPA Brownfields Assessment grant. Managed an extensive investigation of PCB-impacted soil at the City Pier property and developed and implemented a risk-based investigation and cleanup plan under EPA’s TSCA program. Worked directly with MassDEP, MassDevelopment, and the Seaport Council to leverage multiple Brownfields funding sources to assess the site and advance a comprehensive cleanup plan. Conducted a Phase I Environmental Site Assessment and Limited Subsurface Investigation for a real-estate transfer. Identified chlorinated solvent contamination in soil, groundwater, soil gas, and indoor air. Overseeing a Phase II Comprehensive Environmental Site Assessment for submittal to MassDEP. Filed a Permanent Solution with Conditions and removed an Activity and Use Limitation from the Site to allow for sub-dividing of the property. Prepared comprehensive Spill Prevention Control and Countermeasure (SPCC) Plans in accordance with applicable U.S. Environmental Protection Agency (EPA) requirements. Provided on-site SPCC training classes for personnel involved with the handling of petroleum at each hospital.
Page 315
2026 | Randall L. Collins Jr., PLA, ASLA | Page 1 Randy is a Vice President at BETA with nearly 40 years of experience in landscape architecture. He has worked on projects throughout New England, ranging from residential estates to aesthetic improvements to regional highways. Mr. Collins has comprehensive experience working in the public sector. His responsibilities include the development of conceptual design ideas, public participation and outreach, coordination with local and state officials, presentations to historic commissions and other stakeholders, development of design details, and the preparation of final design plans. Mr. Collins’ involvement also includes construction supervision and oversight. Prepared a master plan for a recreation facility for the new middle school and community use. Designed ball fields with underdrains to remove stormwater, tennis courts, a walking trail, parking, and a concession stand. Prepared construction documents for phased project implementation. Designed renovations including a new football field with bleachers and lights, softball fields, a baseball field, an in-line hockey rink, paths, benches, ornamental lighting, park signs, and plantings. Developed naturalistic planting for the newly daylighted Beaver Brook and provided construction observation services. Prepared a master plan to update and restore historic elements of this +100-year- old park and provide new recreational opportunities including basketball courts, volleyball, a splash park, playgrounds, baseball fields, and enhanced fishing access to Cass Pond. Designed parking lot improvements and utility upgrades. Created a vision for the entrance and concession stand area of this large-scale recreational facility located in a former brownfields site. Developed final design documents for three soccer fields, a bike trail, a pitch and putt course, and parking. Integrated vehicle, pedestrian, and bicycle circulation into design considerations. Prepared a master plan for a new middle school, including roadway and parking lot layout, bus loop, sports fields, screening of adjacent properties, and enhancing plantings. Prepared a Master Plan for a new high school and associated facilities under the Massachusetts Model School Program. Coordinated with school and town officials to resolve issues related to vegetated screening, sports fields and equipment, and re-use of memorial elements. Prepared and presented design concepts to the Landscape Architecture BETA: Since 2009 Total: Since 1987 BS, Plant Science/Landscape Architecture, University of Rhode Island, 1986 Registered Landscape Architect RI #271 CT #1155 Certified Low Impact Development Master Designer (RI CRMC) Member, American Society of Landscape Architects
Page 316
2026 | Randall L. Collins Jr., PLA, ASLA | Page 2 Norwood Planning Board and the general community. Developed final plans and specifications for landscape materials and hardscape features, including granite walls and plaza paving, walkways, athletic fields with a 2,000-person-capacity grandstand, press box, and synthetic turf football/track and field with resilient surface track materials. Project manager for a $14 million “Complete Streets” project in Bushnell Park North, which included a road diet for existing roads and focused on pedestrian safety and community access. Designed a grand promenade and landscape enhancements including LID elements, ornamental lighting, pedestrian amenities, and new plantings. Project manager for the award-winning master plan project to honor Stamford’s veterans and enhance safety and connectivity in Veterans Memorial Park. Led design charrettes with stakeholders to develop a final master plan unanimously supported by the committee. Upgrades include an enhanced plaza with a central memorial feature, an amphitheater built into the re-graded hillside, lighted pathways, benches and landscaping, and improved connectivity from the bus stop to the surrounding buildings. Project manager for the restoration and preservation of a historic park. Recommended trail rehabilitation, drainage improvements, and streambank repairs and stabilization. Developed wayfinding and interpretive signage and oversaw invasive plant removal. Managed extensive construction phase, including environmental permitting and public outreach. Provided master planning and construction documentation for improvements to the historic seaside Wickford Village, focusing on historic preservation and pedestrian safety. Presented numerous design options to gain both public and local historic commission approval. Designed intersection modifications that increase pedestrian safety, paver crosswalks, ornamental lighting, and enhancements to Library Park and the waterfront while respecting the village's historic character. Project manager for the development and design of roadway, traffic, and streetscape improvements in Dedham’s Central Business District. Led community outreach and meetings, focusing on enhancing pedestrian safety with wider sidewalks, curb extensions, reduced crossing distances, and improved signal phasing. Upgrades also included ornamental lighting, brick surfaces, bike racks, granite curbing, and streetscape plantings. Project manager and lead landscape architect for the design concepts for the reconstruction of North Square in Boston’s North End. Treatments include ornamental lighting, brick and granite surfaces, bike racks, and sidewalk enhancements. Project features include circulation modifications, pavement rehabilitation, new curbing, widened sidewalks, street trees, and textured crosswalks. Developed conceptual design ideas for improvements to a one-mile section of Route 9 in Shrewsbury, including streetscape and pedestrian safety improvements as well as suggestions on how the adjacent buildings could be aesthetically improved. Provided final design documents for road and sidewalk improvements. Developed site plans for a new library as part of the Stillwater Mill Complex Redevelopment. Included a new roadway connection, on-street parking, a riverwalk with event space, and a pedestrian connection to the adjacent Town greenspace. Incorporated artifacts found during demolition into the site design.
Page 317
2026 | Christopher R. Cronin, PE | Page 1 Mr. Cronin, with 36 years of civil/environmental engineering experience, specializes in wastewater, solid waste, stormwater, and environmental science. As Senior Vice President at BETA, he's led diverse projects, encompassing wastewater pumping and collection systems, construction administration, facility planning, wastewater process, and stormwater system design. He has previous experience in landfill closure and underground storage tank assessment. Assisted in developing a draft Integrated Master Plan for Fall River’s wastewater and stormwater systems. Created conceptual solutions for flooding and sanitary sewer overflow areas. Conducted field investigations and developed resolutions for identified infrastructure issues. Project manager for design of 2,500 linear feet of replacement sewer and Cured-In- Place pipe lining of 950 linear feet of 12-inch diameter sanitary sewer, to provide additional system capacity and fortify existing infrastructure. Prepared environmental assessment and obtained appropriate approvals to allow funding of the project through the State Revolving Loan Fund in approximately 6 months. Provided construction management for the $1.5-million-dollar project. Prepared a comprehensive wastewater facility plan evaluating existing collection system infrastructure, projected service needs, and long-term capital improvements to support future municipal planning. Prepared a comprehensive wastewater facility plan evaluating existing collection system infrastructure, projected service needs, and long-term capital improvements to support future municipal planning. Project manager for Town-wide Infiltration/Inflow Analysis. System consists of 44 miles of gravity sewer and 44 sewage pumping stations. Project included an analysis of pump run times compared to rainfall events and manhole inspections. Prepared the Facility Plan Reaffirmation and Amendments and conceptual design alternatives for upgrading the Centerville Pump Station. Oversaw construction for the installation of five pumping stations and ten miles of new sewers. Managed $4 million, $3 million, and $3.2 million sewer extension projects, including new above- grade package pumping stations at Sheraton Park, Old Buttonwood, and Capron Farms. Civil Engineering, Water and Wastewater Engineering BETA: Since 1998 Total: Since 1990 BS, Civil Engineering Villanova University (1990) Envision Sustainability Professional OSHA 40 – Health and Safety OSHA 10 – Construction Safety OSHA 8 – Supervisory Professional Engineer RI #8509 CT #27587 American Society of Civil Engineers Board Member, Providence Engineering Society
Page 318
2026 | Christopher R. Cronin, PE | Page 2 Project engineer responsible for determining future flows, evaluation of available capacity in the existing collection system and design of a new sewer extension to service new Town Houses planned for construction on the Bryant University Campus. Responsible for providing engineering services associated with the evaluation of the existing sanitary collection system and design of a new sewage pumping station in support of a new townhouse dorm on the Bryant University Campus. Evaluated and designed improvements for Washington Highway and Omega Pumping Stations, including pump replacements, piping, and force main installations. Other improvements included new heating & ventilation and electrical improvements. Wrote Operations & Maintenance Plan and provided operational training. Managed construction services for the $5 million project. Designed a 25 MGD wastewater pumping station featuring five 115 HP pumps and two 24-inch force mains to handle varying flow conditions. Implemented a PLC-based pump control system, standby power generator, and an advanced level control system. Considered unique design challenges, including a 32-foot-deep structure near the Taunton River and a former Manufactured Gas Plant site, with an estimated project cost of $15 million using a progressive design-build method. Managed the design of a pre-cast submersible wastewater pumping station with two submersible pumps, space for a third, and a PLC-based control panel. Included a standby power generator and level control system, and provided construction management services for the $1 million project. Designed and managed the construction of a replacement pre-cast submersible pumping station with three variable frequency drive pumps. Incorporated a standby power generator and a separate room for control panels. Provided construction management services for the $1.4 million project. Designed replacement of 72” diameter screw pumps, including roof structure removal and permanent station bypass. Managed construction services for the $1.5 million project. Designed and managed the replacement and upgrade of pumps and control systems for the Constitution Street Pumping Station. Supervised construction of the $1 million improvements, including extensive flow bypass. Designed and managed the replacement and upgrade of pumps and control systems at Mount Hope Pumping Station. Oversaw the $1 million project, ensuring effective flow bypass during construction. Recommended and designed upgrades for Silver Creek Pumping Station, including new submersible pumps and control systems. Managed the $1.3 million construction, involving extensive flow bypass. Assessed and recommended improvements for a combined sewer overflow structure experiencing dry weather overflows. Designed rehabilitation of the bypass structure, new gravity sewer pipes, and replacement of flow control devices.
Page 319
2026 | Christopher W. Jones, PE | Page 1 Chris is the Vice President of BETA’s structural engineering services group. With 34 years of experience specializing in structural engineering, Chris is versed in the inspection, design, and construction of a wide range of structure types, including bridges, water and wastewater treatment and distribution structures, industrial buildings, and retaining walls. His project experience has included entirely new structures, as well as both major rehabilitations and minor repairs to existing structures. His bridge designs have ranged from simple culvert replacements to complex historic covered bridge rehabilitations. Project manager for updating the town's ten-year-old Management Plan for 18 town-owned bridges and culverts. Responsibilities included site inspections, documentation, repair recommendations, prioritizations, and budgetary cost estimates. Also served as a team leader for some bridge inspections. Structural project manager for the rehabilitation of a 1900-square-foot wastewater pump station. The project involved replacing the above-grade building with a new masonry structure and repairing the concrete foundation walls of the dry well. Project engineer for designing structural repairs and retrofits to various structures at the facility, including final clarifier tanks. Project engineer overseeing the structural design improvements to the headworks building at a wastewater treatment plant. The project included modifications to the existing sluiceways and the addition of aluminum lift assemblies, gratings, stairs, and handrails. Project engineer supervising the structural design of a new 6,300-square-foot water pump station. The design featured a combination of masonry and cold metal framed shear walls, open web steel joists, and steel columns framing a clerestory. Project engineer supervising the design of a wastewater pump station and attached 7500 CF wet well. Assisted with the design of a new return sludge pumping station and final clarifiers for the Field’s Point Wastewater Treatment Facility. Also designed smaller reinforced concrete structures, including a meter/valve chamber and a splitter box, and miscellaneous renovations to existing structures. Structural Engineering BETA: Since 2001 Total: Since 1993 BS, Civil Engineering - Worcester Polytechnic Institute (1992) FHWA–NHI Safety Inspection of In-Service Bridges Professional Engineer MA #41025 CT #23720 RI #8367 NH #16117
Page 320
2026 | Christopher W. Jones, PE | Page 2 Project engineer assisting with the design of a new wastewater pump station. Project engineer for designing the replacement structural slab for an underground pump station. Assisted with the design of a new multipurpose building for storage space, office space, and a truck washing bay at the Field’s Point Wastewater Treatment Facility. The structure was designed to sit safely atop an existing 7-foot diameter effluent conduit. Additional improvements included repairing cracked sluice gate operator supports and providing new aeration tank pipe supports. Assisted with the design of a new three-story solids handling facility at the Field’s Point Wastewater Treatment Facility. Designed a new four-story floor infill for an existing incinerator building being converted to storage space, as well as miscellaneous structures, including an oil tank containment structure and a lime silo support. QA/QC reviewer responsible for bridge quality assurance/quality control review of the complete replacement of a large culvert in Wilton, Maine. The existing metal plate pipe arch will be replaced with a 24-foot span concrete box culvert. The bridge will be closed for 3 weeks to allow for construction. Structural manager for designing a 1,300-foot-long elevated timber boardwalk through a salt marsh. The boardwalk features repetitive 15-foot spans and a 36-foot span with integrated overlooks, using treated timber, tropical hardwoods, and galvanized steel helical piles to minimize impact on the marsh. Structural manager for the superstructure replacement of a 45-foot-span bridge as part of a 2,800-foot roadway reconstruction. Utilized butted prestressed concrete deck beams and managed design complexities due to low freeboard, proximity to an intersection, staged construction for pedestrian traffic, and utility accommodations. Project manager for replacing a 16-foot-span bridge with a 36-foot-span bridge to meet stream crossing standards and simplify water control during construction. Managed design challenges including a nearby sewage pump station, varied bedrock and clay conditions, and raising a gravity sewer main to reduce streamflow risks. Project manager for replacing a three-span 70-foot bridge with an 83-foot single-span structure meeting stream crossing guidelines. The project included widening the bridge to two lanes, using New England Deck Bulb Tee Beams, and constructing with precast concrete abutments and piles during a limited road closure. Project manager for designing an 80-foot-span prefabricated steel truss bridge. Coordinated closely with permitting agencies for construction within a regulated floodway. Quality control manager for designing a three-span 60-foot timber pedestrian stream crossing. The design incorporated galvanized helical piles and supported new sidewalks along Route 7.
Page 321
2026 | Danny P. Rebelo, PE | Page 1 Danny Rebelo has over 24 years of diverse experience in civil and municipal infrastructure projects, specializing in the design and construction inspection of roadways, drainage, wastewater, and waterworks for communities and agencies across Connecticut and Massachusetts. Danny has proven expertise in managing project budgets and schedules while delivering high-quality design and construction inspection services that meet or exceed client expectations. Project engineer responsible for the drainage improvements at four failing trench drains at utility dense streetscape bump-outs on Park Street. Developed contract drawings, specifications, and estimates. Responsibilities included communicating with utilities, design, drawings, specifications, and estimating. Project engineer for the design of 700 LF of sidewalks abutting an established stone wall around Bushnell Park Pond as part of a major pond dredging and restoration project. Developed contract drawings, specifications, and estimates. Responsibilities included communicating with local staff and working on design, drawings, specifications, and estimates. Project engineer for the reconstruction of pedestrian ramps at dozens of locations around the City of Hartford. Provided value engineering for the drawings, specifications, and estimates. Chief construction inspector for a $9.5 million-dollar municipal streetscape project on 2,785 LF of a critical mixed-use principal urban arterial road, including concrete base, drainage improvements, brick work, sidewalks, elevated crosswalks, bump- outs, curbing, ornamental lighting, and traffic control signaling at three intersections. Responsibilities included submittal review, construction inspection services in accordance with CTDOT procedures, keeping detailed records, and coordinating with the contractor, client, and residents. Maintained modern electronic records to minimize errors and maintain high rates of efficiency. Construction inspector for a $3.3 million-dollar municipal roadway project on 5,138 LF of critical mixed-use arterial roads of Moody Road and Cranbrook Boulevard by full-depth reconstruction and 1,884 LF of local residential roads by reclamation. Responsibilities included submittal review, construction inspection services in accordance with CTDOT procedures, keeping detailed records, and coordinating with the contractor, client, residents, and designer. Performed all stormwater Civil Engineering BETA: Since 2018 Total: Since 2002 BS, Civil Engineering – Northeastern University, Magna Cum Laude and Honors Program (2002) OSHA 10 (2011) OSHA 8 Class II Asbestos (2014) OSHA Confined Space Entry (2011) NETTCP Concrete Inspector Certification (March 2025) NETTCP Paving Inspector Certification (March 2025) EPA CGP 2022 Site Inspector Certification (2024) Toastmasters International Professional Engineer: MA #52043 (2015) Professional Engineer: CT #0025508 (2007)
Page 322
2026 | Danny P. Rebelo, PE | Page 2 inspections and reports per DEEP General Permit as modified on 11/25/2022. Maintained modern electronic records to minimize errors and maintain high rates of efficiency. Construction inspector for CCGP-funded sidewalks to improve walkability along the Elm Street corridor, including pedestrian signaling at CT State Community College, Asnuntuck. Responsibilities included submittal review, construction inspection services in accordance with CTDOT procedures, keeping detailed records, and coordinating with the contractor, client, and residents. Construction inspector for CCGP-funded upgrades to crosswalks and ramps at several separate locations. Responsibilities included submittal review, construction inspection services in accordance with CTDOT procedures, keeping detailed records, and coordinating with the contractor, client, and residents. Transitioned antiquated standard paper record-keeping to a dynamic electronic system. Construction inspector for the traffic control system at the intersection of Route 1 – East Main Street & Weed Avenue and sidewalk ramp replacement portion of the project. Responsibilities included submittal review, construction inspection services in accordance with CTDOT procedures, keeping detailed records and coordinating matters with the contractor, client, and residents. Full-time construction inspector for a municipal utility and multi-street reconstruction project. Responsibilities included performing construction and inspection services in accordance with CTDOT procedures, which include keeping detailed records and coordinating with the contractor, client, and residents. Construction inspector for a 3,198 LF roadway reconstruction project on a critical mixed-use arterial road. Responsibilities included submittal review, construction inspection services in accordance with CTDOT procedures, keeping detailed records and coordinating with the contractor, client, and residents. Full-time construction inspector for a municipal utility and multi-street reconstruction project. Responsibilities included performing construction and inspection services in accordance with CTDOT procedures, keeping detailed records and coordinating with the contractor, client, and residents. Designed the civil/site portion for two fat, oil, and grease separation units. Managed the project between the client, local staff, and various discipline groups from a remote office. Provided construction administration services. Project engineer for the design of a 7,000-feet 24-inch DIP secondary force main and rehabilitation of 20-mgd Broad Street Pumping Station. Developed Pipe-Flo models and produced contract drawings through Civil 3D. Designed the mechanical piping system and selected pumps for dual-force main operation. Worked with drawings, specifications, subconsultants, and vendors. Project engineer for the design of a 1.0-mgd wastewater pumping station and a 3,000-feet 10-inch force main. Work production of contract drawings and specifications, Pipe-Flo models, pump selections, technical memos, site layout, communication with vendors, and working closely with the client.
Page 323
Appendix - Contract Exceptions
Page 324
Page 5 of 7 5. Professional Liability. One Million Dollars ($ 1,000,000.00) coverage per occurrence for each site or project for all damages arising out of bodily injury, personal injury, and property damage. 6. D e d u c t i b l e s a n d S e l f - I n s u r e d R e t e n t i o n s : A n y d e d u c t i b l e o r self-insured retention must be declared to and approved by the Town of Granby. All deductibles or self-insured retentions are the sole responsibility of the awarded Respondent to pay and/or to indemnify. 7. Errors and Omissions Insurance. The awarded Respondent shall provide and maintain Errors and Omissions Insurance with minimum limits of $2,000,000 per occurrence/annual aggregate. The policy shall not have a deductible greater than $50,000.00. The Town of Granby shall be named as “Additional Insured.” Coverage is to be provided on a primary, noncontributory basis. Waiver of subrogation in favor of the Town of Granby is required on all applicable policies, including workers’ compensation. If any policy is written on a “Claims Made” basis, the policy must be continually renewed for a minimum of two (2) years from the completion date of the Contract. If the policy is replaced and/or the retroactive date is changed, then the expiring policy must be endorsed to extend the reporting period for claims for the policy in effect during the Contract for two (2) years from the completion date. Defense, Hold Harmless and Indemnification The successful proposer agrees, to the fullest extent permitted by law, to defend, indemnify, and hold harmless the Town, its employees, officers, officials, agents, volunteers and independent contractors, including any of the foregoing sued as individuals (collectively, the “Town Indemnified Parties”), from and against all proceedings, suits, actions, claims, damages, injuries, awards, judgments, losses and expenses, including attorney’s fees, arising out of or relating, directly or indirectly, to the successful proposer’s malfeasance, misconduct, negligence or failure to meet its obligations under the RFP or the Contract. The successful proposer’s obligations under this section shall not be limited in any way by any limitation on the amount or type of the successful proposer’s insurance. Nothing in this section shall obligate the successful proposer to indemnify the Town Indemnified Parties against liability for damage arising out of bodily injury to persons or damage to property caused by or resulting from the sole negligence of the Town Indemnified Parties. In any and all claims against the Town Indemnified Parties made or brought by any employee of the successful proposer, or anyone directly or indirectly employed or contracted with by the successful proposer, or anyone for whose acts or omissions the successful proposer is or may be liable, the successful proposer’s obligations under this section shall not be limited by any limitation on the amount and type of damages, compensation or benefits payable by the successful proposer under workers’ compensation acts, disability benefit acts, or other employee benefits acts. The successful proposer shall also be required to pay any and all attorney’s fees incurred by the Town Indemnified Parties in enforcing any of the successful proposer’s obligations under this section, which obligations shall survive the termination or expiration of this RFP and the Contract. As a municipal agency of the State of Connecticut, the Town will NOT defend, indemnify, or hold harmless the successful proposer. These insurance requirements are not meant to be construed as a limitation of liability. The parties agree that the amounts of insurance under this Agreement do not, in any way, limit the Respondent’s liability to the Town of Granby by virtue of this promise to indemnify and hold the Town of Granby
Page 325
Page 6 of 7 harmless so that in the event of any settlement of a claim or a judgment in an amount in excess of the amount of insurance coverage carried by the awarded Respondent, the Respondent shall be liable to the Town of Granby for the d i f f e r e n c e , p l u s a l l f e e s a n d e x p e n s e s i n c u r r e d i n c o l l e c t i n g same, all at the Respondent’s sole cost. Freedom of Information All proposals and any related submittals to the Town are subject to the requirements of the State of Connecticut Freedom of Information Act, regardless of whether they are marked as confidential, proprietary, or in any other manner. By the act of submitting a bid, bidders agree that they will be subject to Connecticut General Statutes Section §1-200 et seq. Award The Town intends, but is not required, to make one or more awards as a result of this RFP. Work Product Ownership All responses and submittals received as a result of this Request for Proposals shall become the property of the Town upon receipt. All work products provided to the Town following award shall also be the sole property of the Town upon receipt. VI. Questions All questions regarding this Request for Proposals shall be submitted via email only to Mike Walsh, Town Manager, MWalsh@Granby-ct.gov. All questions shall be presented by July 6, 2026 to allow for the preparation and distribution of addenda. Responses will be posted on the Town’s website. THE TOWN OF GRANBY IS AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER. WBE/MBE/SBE & SECTION 3 DESIGNATED BUSINESSES ARE ENCOURAGED TO APPLY.
Page 326
Appendix - Cost Proposal Form and BETA Hourly Rates
Page 327
Page 7 of 7 APPENDIX A Cost Proposal Name of Engineering Firm: ___________________________________________________ Services Needed On-Call Engineering and Related Services Please indicate your firm’s hourly fees over the five-year period of the contract Billing Category Hourly Billing Rate Project Manager ________________ Chief Engineer ________________ Engineer ________________ Technician Support ________________ Clerical/Researcher ________________ Other ________________ Other Expenses (if applicable): Identify any other categories and costs required to provide Engineering and On-Call services that are not included above: ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________
Page 328
January 7, 2026 2026 BILLING RATES 2026 HOURLY RATE SCHEDULE Labor Category Loaded Hourly Rate Principal in Charge $ 290 - $ 410 Senior Associate $ 275 - $ 305 Lead Professional $ 230 - $ 295 Senior Discipline Professional $ 225 - $ 265 Senior Project Manager $ 195 - $ 275 Senior Resident Observer $ 215 - $ 240 Project Manager $ 175 - $ 230 Resident Observer $ 165 - $ 190 Senior Project Professional $ 140 - $ 205 Project Professional $ 135 - $ 170 Professional $ 110 - $ 160 Staff Professional $ 110 - $ 145 Designer $ 105 - $ 140 Technician $ 90 - $ 120 Rates effective through December 31, 2026 Escalation, up to 5%, applied to each year thereafter. Direct expenses will be billed at 110% of actual cost.
Page 329
Rhode Island Massachusetts Connecticut New Hampshire www.BETA-Inc.com
Page 330
Proposal for Professional Engineering Services GZA GeoEnvironmental, Inc. 1350 Main Street, Suite 1400 Springfield, MA 01103 Phone: 413-726-2100 Fax: 413-732-1249 GZA.com • 35 Offices Nationwide July 24, 2026
Page 331
An Equal Opportunity Employer M/F/V/H July 22, 2026 Mike Walsh, Town Manager Town of Granby 15 North Granby Road Granby, CT 06035 Re: Request for Proposals Professional Engineering Services Town of Granby 15 North Granby Road Granby, CT 06035 Dear Mr. Walsh: GZA GeoEnvironmental, Inc. (GZA) is pleased to submit this statement of qualifications to support the Town of Granby, Connecticut with on-call engineering services. GZA offers the breadth and depth of a multi-disciplinary, employee-owned, consulting firm with experienced environmental, geotechnical, ecological, water, and construction management professionals, supported by more than 800 staff in 35 offices across the United States, including a local office in downtown Springfield. In 2025, GZA completed the Granby Recreation Facilities Analysis, which included the preparation of a master plan for Salmon Brook Park. In this master plan, GZA worked with the Town to propose a coordinated layout of new and relocated park facilities, which included a pickleball court and a restroom building. From working on this project, including coordination with the Town and public engagement with local residents and other stakeholders, GZA’s team of landscape architects and civil engineers gained an understanding of Granby’s open space system and recreation facilities, while developing a successful collaborative relationship with Town staff. In response to the Town’s request for proposals for on-call services, which may include design of recreational facilities as well as a park restroom building, we have included the architecture firm edmSTUDIO as a subconsultant on our team. GZA and edmSTUDIO recently collaborated on the renovation of Walker Grandstand, an historic baseball facility in Forest Park in Springfield Massachusetts. If selected, GZA’s team will provide the Town with designs for facilities and site improvements that are implementable, coordinated with existing site infrastructure and utilities, aesthetically integrated into each location, responsive to how the public uses each site, and attentive to the maintenance practices and operations of Town staff. Based on the scope of projects this project team has performed over the years, we believe our team has the capacity and depth of resources to complete your project needs in a timely and responsive manner.
Page 332
July 22, 2026 Response to Request for Proposals: Professional Engineering Services Town of Granby, CT Page | 2 Proactive by Design An Equal Opportunity Employer M/F/V/H We would welcome the opportunity to discuss this proposal with the RFP review committee. Should you have any questions, please contact the undersigned. Very truly yours, GZA GEOENVIRONMENTAL, INC. Nathaniel Russell, P.E. Anja Duffy, PLA Associate Principal Consultant/Reviewer nathaniel.russell@gza.com anja.duffy@gza.com Dan Shaw, PLA Project Manager daniel.shaw@gza.com
Page 333
DCAMM - ASTM Phase I Environmental Site Assessment and Focused Subsurface Investigation DCAMM Project No. ORE2618 277 Ashland Street, North Adams, MA T O C Table of Contents Section 1. Firm Profile Section 2. Understanding of Services Section 3. Qualifications Section 4. List of Personnel Section 5. References Attachment A. Relevant Project Experience Attachment B. Resumes Attachment C. Cost Proposal
Page 334
Town of Granby Professional Engineering Services P a g e | 1 Firm Profile GZA GeoEnvironmental, Inc. (GZA) was established in 1964, and over the past 62 years, we’ve grown into a nationally recognized, multidisciplinary consulting firm with 35 offices across the United States. GZA has successfully completed thousands of projects for a diverse range of public and private sector clients. Today, we offer a comprehensive suite of services designed to address complex challenges across multiple industries, including: Environmental Engineering and Environmental Science Services Ecological/Natural and Nature-Based Solutions (NNBS) Planning Services (including urban and land-use/re-use planning) Engineering Services (Environmental, Civil/Site, Geotechnical, Structural, GeoStructural, and Waterfront/Marine) Building Services / Due Diligence Landscape Architecture Water Resources / Water Rights Data Management, GIS/Geospatial Analysis and Visualization Construction Management and Oversight Community Education and Engagement GZA is an employee-owned firm with over 800 staff members motivated to propel the firm forward, seeking integrated, complex, and interesting projects that underscore a commitment to client satisfaction, environmental stewardship, and best practices in engineering, science, planning, and construction. GZA has earned a reputation for solving site-related challenges in both urban and rural areas, as well as on projects with highly complex engineering challenges. This integrated service model is directly aligned with the Town of Granby’s need for responsive, multidisciplinary support for athletic facility improvements, park infrastructure, utility coordination, permitting, and municipal capital projects over the five-year on-call period. Section 1. LEAD OFFICES GZA GeoEnvironmental, Inc. 1350 Main Street, Suite 1400 Springfield, MA 01103 GZA GeoEnvironmental, Inc. 95 Glastonbury Boulevard, 3rd Floor Glastonbury, CT 06033 CORPORATE OFFICE GZA GeoEnvironmental, Inc. 249 Vanderbilt Avenue Norwood, MA 02062 GZA is an Employee-Owned, for Profit C-Corporation Established: 1964-Massachusetts PRIMARY CONTACT Dan Shaw Project Manager 413-726-2129 daniel.shaw@gza.com
Page 335
Town of Granby Professional Engineering Services P a g e | 2 Our success is based on our ability to be good listeners, deliver practical and sound planning and engineering solutions, while being mindful of the client’s budget and schedule. CIVIL ENGINEERING GZA offers comprehensive engineering and environmental services to support successful project planning, design, and implementation. Our team brings deep experience in asset management, condition assessment, site planning, evaluation of design alternatives, roadway and utility layout, cost analysis, permitting, and construction oversight. We provide services including planning, design, permitting, estimating probable construction costs, preparation of bid documents, bidding assistance, construction management, oversight and inspection (either full-time or part-time as necessary), and preparation of as-built drawings and operation and maintenance plans. We integrate environmental constraints and opportunities with client goals to deliver optimized, buildable solutions. Our proven track record in navigating complex, multi-agency permitting processes, paired with our strength in stakeholder and public outreach, adds significant value. Through close collaboration between our engineering and environmental teams, we ensure every design is practical, environmentally responsible, and aligned with regulatory requirements. Our focus remains on delivering cost-effective, timely, and sustainable outcomes that meet the unique needs of our clients. LANDSCAPE ARCHITECTURE GZA’s landscape architects specialize in creating vibrant outdoor spaces where people can connect with nature and community. We design places for children to play, neighbors to gather, and people to relax and recreate. By integrating these opportunities into the built environment, we strive to enhance the health and well-being of individuals, communities, and ecosystems. GZA’s landscape architects collaborate throughout the design process with ecologists, engineers, scientists, and permitting specialists, allowing us to provide achievable design solutions on complex sites. By working as an interdisciplinary team, we can simultaneously see the big picture and provide the specific details for implementation. Relationships are central to landscape architecture at GZA. We develop trusting, lasting relationships with our clients through good communication and attention to clients’ needs. We work carefully to ensure our clients’ goals are met, while addressing the needs of the community and ecosystem at each site. Our work includes public parks, schools, sports facilities, ecological restoration sites, outdoor learning environments, playgrounds, green infrastructure, trails and boardwalks. We collaborate with architects on site plans for schools and multifamily housing developments; with engineers on projects combining infrastructure with ecological restoration and public access; and with communities in developing visions for healthier neighborhoods. We regularly provide master plans, site designs, illustrative and 3D renderings, public engagement, construction documents, and construction phase services. ECOLOGICAL PLANNING & PERMITTING GZA provides ecological services, from initial assessment of existing conditions to recommendations, through design, permitting, and implementation. We conduct these services whether directly for habitat
Page 336
Town of Granby Professional Engineering Services P a g e | 3 management purposes (including aquatic settings such as tidal and freshwater ponds, and streams) or in support of development. In today’s highly regulated world, virtually all alterations of the natural environment require some form of environmental permitting. As part of this process, GZA will: Evaluate and document existing natural resources Identify the regulated resources and permit processes Assess possible impacts and prepare mitigation and/or restoration recommendations Develop and implement a permit success strategy based on the preferred alternative Design mitigation or restoration as needed Coordinate with regulators to navigate the often-complex permitting process Implement any needed project mitigation and restoration GZA’s Ecology group is staffed with scientists and field task managers who have experience in project planning, permitting, and construction-related environmental support services. Our ecological project approach and management process incorporate innovative solutions designed to minimize the impact on natural resources and ensure environmental compliance throughout the construction process. ONE COMPANY – ONE TEAM APPROACH GZA maintains a strong “one company – one team” approach to staffing. Our personnel and resources are shared among different offices where and when they are needed. This enables us to deliver the most qualified and experienced team members for each assignment. This “One Company – One Team” philosophy provides clients with a broad range of resources and technical expertise. The collective knowledge of the entire company is available to each client on every project for an experience that is uniquely GZA.
Page 337
Town of Granby Professional Engineering Services P a g e | 4 Section 2. Understanding of Services PROJECT UNDERSTANDING GZA understands the Town of Granby (“Town”, “Client”) is seeking on-call engineering services for planning, design, and construction of improvements at Town-owned sites including the Middle/ High School Complex and Salmon Brook Park. At the schools, the Town is seeking the replacement of an existing athletic running track and adjacent baseball and softball fields. At Salmon Brook Park, the Town plans to create a new year- round park restroom building, new pickleball courts, and to perform maintenance of an existing sewer pump. In addition to these projects, the Town may seek to engage the selected on-call engineering firm for other tasks related to the Town’s infrastructure and facilities. In 2025, GZA completed the Granby Recreation Facilities Analysis, which included the preparation of a master plan for Salmon Brook Park. In this master plan, GZA worked with the Town to propose a coordinated layout of new and relocated park facilities, which included a pickleball court and a restroom building. During the course of public meetings, stakeholder interviews, and discussions with Town staff, GZA gained an understanding of this well-used park’s current and future needs. A dedicated pickleball court, away from residential neighbors, emerged as a high priority for the park. A year-round restroom building was also identified as an important improvement. To accommodate these, the Master Plan proposed re- configurations of existing athletic fields, as well as extensions of existing site utilities. From our understanding of Salmon Brook Park’s existing infrastructure, facilities, and high level of use, we anticipate that the engineering services for the design of new facilities may include design for the relocation of existing features. Granby’s extensive parks and school athletic facilities represent important public assets that require coordinated maintenance, renewal, and infrastructure investment over time. GZA successfully assisted the Town with initial planning for coordinated upgrades to many of the Town’s recreational facilities during the Granby Recreation Facilities Analysis, and our team would be pleased to continue supporting Granby as the Town undertakes the next round of improvements to its recreational facilities and infrastructure. GZA understands that this contract is structured as a five-year task-order/on-call assignment, with individual services to proceed only upon written authorization by the Town. TOWN-PROVIDED INFORMATION GZA anticipates that the Town will provide available information and coordination necessary to support each authorized task order, including available record drawings, prior studies and reports, utility information, existing maintenance records, available GIS or survey information, and other relevant background documentation. GZA also anticipates that the Town will provide reasonable site access, identify appropriate Town staff and stakeholder contacts, support coordination with facility users and operations staff as needed, and provide timely review comments at key project milestones.
Page 338
Town of Granby Professional Engineering Services P a g e | 5 At the outset of each assignment, GZA will work with the Town to confirm available information, identify any additional data needs, and establish a coordinated approach for advancing the work efficiently. PROJECT APPROACH If selected, GZA’s team will provide the Town with designs for facilities and site improvements that are implementable, coordinated with existing site infrastructure and utilities, aesthetically integrated into each location, responsive to how the public uses each site, and attentive to the maintenance practices and operations of Town staff. Our design process will benefit from our existing knowledge of Granby’s recreational facilities, and will be based on an in-depth review of available information, site visits, existing conditions site survey, review of permitting requirements, discussions with Town staff and stakeholders, and public input and engagement as needed. Due to proximity to wetland resources in Salmon Brook Park, GZA’s ecological consultants will assist the Town in identifying and securing necessary permits for the proposed work, if needed. Designs for site improvements will be supported by cost estimates, which we will maintain as each project advances. For each authorized assignment, GZA will tailor its approach to the specific project type, whether advancing athletic facility improvements at the school complex, site and utility design for Salmon Brook Park improvements, sewer pump maintenance assessment and administration, or other municipal civil engineering tasks requested by the Town. Design of the Salmon Brook Park restroom building will be led by edmSTUDIO, who will provide architecture services as part of our consulting team. edmSTUDIO’s architecture practice is supported by structural engineering services from Macchi Engineers, and mechanical, electrical, and plumbing (MEP) services from CES. From edmSTUDIO: Designing a successful year-round public restroom requires more than simply meeting program requirements. Our approach begins by understanding how the facility will be used throughout the seasons, maintenance operations, security concerns, and the character of the surrounding park. We collaborate with municipal staff and stakeholders and, when appropriate, facilitate public engagement to ensure the facility reflects the needs of both the community and those responsible for its long-term operation. Our design focuses on creating durable, low-maintenance facilities that are safe, accessible, and energy efficient. We prioritize Crime Prevention through Environmental Design (CPTED) principles, including vandalism-resistant materials and fixtures, clear sightlines, and building components that can withstand New England's climate and heavy public use. To support year-round operation while minimizing energy costs, we design high performance building envelopes with continuous insulation and airtight construction, paired with efficient mechanical and lighting systems, incorporate low flow plumbing fixtures, and evaluate opportunities for advanced electric systems and solar energy where appropriate. From design through bidding and construction, edmSTUDIO remains an active partner, delivering coordinated documents and responsive construction administration to help deliver a facility that will serve the community reliably for decades.
Page 339
Town of Granby Professional Engineering Services P a g e | 6 Section 3. Qualifications ON-CALL EXPERIENCE GZA offers all of our core services out of our Massachusetts and Connecticut offices, allowing us to provide comprehensive services the Town may need throughout the on-call period, with a team experienced with Connecticut regulations and permitting. GZA also has the ability to call upon other experts as needed from our vast team of professionals in our offices in New England and beyond if specialty needs arise during the Project or if additional staffing is needed. GZA’s staff, with diverse technical backgrounds, has demonstrated that it has the resources, flexibility and technical and project management expertise needed to provide services to complete large and small projects – regardless of complexity -- within a broad range of disciplines. With the ability to manage unpredictability, remain nimble, and mobilize quickly, our teams can respond to inquiries with urgency, sensitivity, knowledge, and value, while remaining mindful of project costs and schedule. As such, GZA has the capacity to handle a variety of on-call assignments that the Town may require, including concurrent assignments. GZA has decades of experience on projects in Connecticut, Massachusetts and beyond, working with government agencies, regional planning commissions, and municipalities, as well as private clients. Provided below is a partial listing of some of those cities and towns we have held on-call assignments with. While this list is not inclusive of all on-call contracts, it serves to illustrate our project experience with this specific type of service. Many of these on-call assignments, particularly with state agencies, have been renewed and maintained for more than a decade. GZA understands the demands of managing multiple concurrent assignments, responding to urgent infrastructure needs, and maintaining continuity, responsiveness, and cost control across long-term municipal and agency contracts. Trinity College CT Department of Transportation CT Department of Energy and Environmental Protection Connecticut Department of Administrative Services University of Connecticut City of New Britain, CT UMass Amherst MA Department of Conservation and Recreation Massport MA Division of Ecological Restoration MA Dept. of Capital Asset Management & Maintenance Massachusetts Water Resources Authority Boston Water and Sewer Commission City of Springfield, MA City of Chicopee, MA City of Northampton, MA City of Westfield, MA City of Newton, MA City of Salem, MA City of Somerville, MA City of Boston, MA City of Andover, MA
Page 340
Town of Granby Professional Engineering Services P a g e | 7 City of Cambridge, MA City of Quincy, MA Town of Agawam, MA Town of Barnstable, MA Town of Cohasset, MA Town of Cotuit, MA Town of Dennis, MA Town of Devens, MA Town of Dighton, MA Town of East Longmeadow, MA Town of Framingham, MA Town of Granby, MA Town of Medford, MA Town of Nantucket, MA Town of Natick, MA Town of Raynham, MA Town of Seekonk, MA Town of Shrewsbury, MA Town of Wrentham, MA Town of Yarmouth, MA Town of Wethersfield, MA Town of Brockton, MA Area Transit Authority The Hotchkiss School Greenwich Hospital The Loomis Chaffee School CAPACITY AND RESPONSIVENESS GZA has the staffing depth, multidisciplinary technical resources, and established subconsultant relationships necessary to support the Town’s five-year task-order/on-call assignment. Our proposed team includes Connecticut-licensed professional engineers, landscape architects, ecological and permitting specialists, construction phase support staff, and dedicated QA/QC reviewers who can be assigned based on the scope, complexity, and schedule of each authorized task order. This staffing structure allows GZA to respond quickly to routine municipal requests while also providing specialized technical support for more complex assignments. GZA’s project manager will serve as the Town’s primary point of contact and will coordinate staffing, budgets, deliverables, and communications for each assignment. For concurrent task orders, GZA will assign appropriate discipline leads and supporting staff, track progress against agreed-upon schedules, and maintain regular coordination with the Town to confirm priorities, review milestones, and address schedule or budget considerations early. This approach provides clear accountability and allows individual assignments to advance efficiently without losing sight of the overall on-call program. GZA will also coordinate directly with our subconsultants, including architectural, structural, MEP, and survey partners, to integrate their work into each task order as needed. We will establish project-specific scopes, schedules, and deliverable responsibilities at the outset of each assignment, then manage internal and subconsultant reviews to support timely, coordinated, and complete submissions to the Town. SUBCONSULTANTS While GZA can offer the majority of the core and specialized services requested in the RFP, we have included specialized subconsultants in our proposed team to supplement and support our work. Our proposed team also includes subconsultants edmSTUDIO (architectural services), CES (MEP services), Macchi Engineers, LLC (structural engineering), and Heritage Land Surveying & Engineering, Inc. (land surveying). RELEVANT PROJECT EXPERIENCE Generalized narratives and firm/service area profiles for GZA, edmSTUDIO, CES, Macchi Engineers, and Heritage Land Surveying and Engineering, Inc., along with project descriptions of applicable projects within the last five years, are included in Attachment A.
Page 341
Town of Granby Professional Engineering Services P a g e | 8 Section 4. List of Personnel Key to providing successful professional services is the quality and experience of the team of personnel proposed to work for the Town. GZA considers the caliber of our team members to be our number one qualification. PROPOSED GZA PROJECT TEAM The following professionals are included as the key members of GZA’s project team for this on-call assignment. These staff have significant experience working together on projects for municipalities, including the types of projects that GZA expects to perform under this on-call contract. Resumes are located in Attachment B. Corresponding hourly rates for each project team member are included in the attached cost proposal. NATHANIEL L. RUSSELL, PE | PRINCIPAL | GEOTECHNICAL/CIVIL ENGINEER (Associate Principal Engineer rate) Mr. Russell, P.E. is GZA’s proposed Principal-in-Charge for all assignments under this on- call. Mr. Russell is currently the geotechnical and civil engineering lead for the Springfield office and a Connecticut Professional Engineer. As a GZA Vice President and GZA Principal, Mr. Russell regularly interfaces with all of the service areas that GZA offers. He will be a key player in GZA’s continuing responsiveness to the needs of our clients, matching company personnel and practice areas to the tasks at hand and marshalling response teams to address client requirements. Mr. Russell is a civil and geotechnical engineer who serves as an Associate Principal for GZA with over 22 years of experience, including the past 12 years at GZA’s Springfield office. His experience includes geotechnical engineering and design, parks and dams, site investigations, landfill design and permitting, stormwater and erosion and sediment control design and permitting, wetland permitting, environmental remediation and brownfields redevelopment, alternative energy site development, project management, construction management and construction quality assurance, and litigation support. He has extensive experience in both design and construction, with broad exposure to all aspects of civil engineering.
Page 342
Town of Granby Professional Engineering Services P a g e | 9 DANIEL SHAW, PLA | LANDSCAPE ARCHITECT (Project Landscape Architect rate) Mr. Shaw will be the Project Manager / Lead Landscape Architect and will serve as the primary contact for the Town regarding the technical work and financial management for the on-call contract. He will work with the Town’s project team to schedule project- related meetings and manage the preparation of deliverables. Mr. Shaw is a registered Landscape Architect who has created landscape designs for a range of clients, including municipalities, architects, and state agencies. His background has given him broad knowledge in designing public spaces, parks, trails, playgrounds, and athletic facilities. STEVEN D’AMBROSIO, P.E. | CIVIL ENGINEER (Project Engineer rate) Mr. D’Ambrosio is a site civil professional engineer with over 23 years of experience. His experience includes site civil design and permitting for development of residential, commercial, and municipal properties and golf courses, sanitary sewer system design, hydrologic and hydraulic modeling, stormwater system design, utility coordination, roadway layout and design, and the design and permitting for freshwater dredging, plus other water resources and parks projects. Mr. D’Ambrosio is well versed at site civil design elements, including utility coordination, design development of drawings and specifications, cost estimate development, pre-bid consultation and addenda preparation, review of bids and construction administration, including onsite inspections and punch list development, etc. He is experienced at working with contractors on large- scale assignments and often leads teams on large assignments. ANJA RYAN DUFFY, PLA, WEDG | CONSULTANT REVIEWER| LANDSCAPE ARCHITECT (Senior Landscape Architect rate) Ms. Duffy has 19 years of professional experience and will be responsible for in-house Quality Control / Quality Assurance for the on-call assignment as the assigned in-house Consultant / Reviewer (C/R). The C/R is competent in the appropriate disciplines and is independent from the day-to-day operation of the project. The C/R concentrates on the technical approach, correctness, and loss prevention, and plays a major role in controlling the quality of services by reviewing major concepts, approaches, conclusions, and recommendations before they are transmitted to the client. Ms. Duffy’s experience includes site development projects, including landscape/site design for park redevelopment projects, site civil work, and master planning work for recreational facilities. Her work includes preparing master plans, grant application support, bid phase support, construction phase services, and on-site construction monitoring activities. MARK STADNICKI, P.E. | CIVIL ENGINEER (Project Engineer rate) Mr. Stadnicki is a Professional Engineer with experience in various aspects of civil engineering site development, including layout, grading, utility coordination, drainage design, and construction support. He has worked on numerous site civil developments performing tasks such as review of local by-laws, evaluation, planning, layout, grading, utility and drainage design, preparation of engineer’s opinions of probable construction cost, construction specification writing, contractor submittal review, and construction observation.
Page 343
Town of Granby Professional Engineering Services P a g e | 10 ROBIN CASIOPPO, PWS, PSS, CESSWI | ECOLOGICAL SERVICES (Senior Wetland Scientist rate) Ms. Casioppo is a Project Manager with experience in ecological assessments and environmental permitting. Ms. Casioppo is a field biologist who specializes in botany, wildlife, wetland ecology, and soil science. She is responsible for conducting botanical surveys, rare species surveys and monitoring (including reptiles and amphibians, birds, lepidoptera, and plants), habitat mitigation design, vernal pool assessments, wetland delineations, and natural resources inventories. Ms. Casioppo is a Professional Wetland Scientist and has performed numerous wetland delineations throughout New England and has supported permitting efforts consisting of federal (USACE Section 404), State (MA and CT 401 WQC, MA WPA, CT IWWA, RI FWA), and local permits. She has also performed numerous wetland delineation and permitting peer review services for various town Conservation Commissions. STEPHEN LECCO, CEP, AICP, PWS | PERMITTING (Associate Principal Scientist rate) Mr. Lecco is a Senior Environmental Planner with more than 30 years of experience in planning, permitting and environmental analysis for waterfront, water resources, airport, highway, utility, dam, site development, recreation, ecological restoration, energy facility and site remediation projects. He has been the CEPA/MEPA/NEPA lead for numerous projects in New England and beyond. His broad knowledge of many technical elements allows him to successfully manage large-scale interdisciplinary and complex projects that are required to comply with CEPA/NEPA, Section 404/401 Clean Water Act, Coastal Zone Management, National Historic Preservation Act, Endangered Species Act, Magnuson-Stevens Act and other federal, state and local laws, regulations and policies. JEFFREY TAYLOR | LANDSCAPE DESIGNER (Assistant Landscape Designer rate) Jeffrey Taylor supports CAD drawing production and construction document preparation for site, landscape, and park improvement projects. His work focuses on developing clear, coordinated, and legible drawings that communicate design intent, support interdisciplinary review, and provide the level of detail needed for construction bidding. His attention to drafting standards, graphic clarity, and deliverable organization helps produce bid-ready documents that contractors can interpret and use effectively during pricing and construction.
Page 344
Town of Granby Professional Engineering Services P a g e | 11 GZA GeoEnvironmental, Inc. (GZA) has provided park improvement services to municipalities in the region for over 25 years. We have extensive experience with urban and rural parks, including master planning, public outreach, cost estimating, preparation of construction documents, and construction phase services. GZA has assisted municipalities in preparing and furthering master plan-level designs into construction documents, administering public bids, and serving as engineer-of-record for numerous publicly funded projects. The following references can attest to GZA’s on-call engineering and landscape architecture services. REFERENCES The following three references are from similar municipal park, recreation, and site improvement projects: 1. PROJECT: 25 SCHOOL PLAYGROUNDS Description: GZA provided site civil engineering and landscape architecture services for the development of twenty-five new school playgrounds throughout Springfield at various elementary schools. GZA provided full design, cost estimation, preparation of construction documents, bid phase services, and construction phase services. Each site was publicly bid individually, with bids awarded to a variety of contractors. Construction on all 25 sites is currently nearing completion. The project was funded with Early and Secondary School Emergency Relief III funding. Location: Springfield, MA Completion Date: Fall 2024 Contact: John Carignan, Director of School and Municipal Buildings Phone: (413) 787-6279 Owner: Facilities Management Division, City of Springfield Address: 233 Allen St, Springfield, MA 01108 Email: jcarignan@springfieldcityhall.com Section 5. References
Page 345
Town of Granby Professional Engineering Services P a g e | 12 2. PROJECT: POMERANCE AND TUCHMAN MASTER PLAN Description: GZA prepared a master plan for a 100-acre municipal park in Greenwich, CT, focused on ecological management, historic preservation, and passive recreation. Recommendations were organized by priority level and approximate estimated cost. The master plan also identified potential funding sources and outlined installation and maintenance considerations for proposed improvements. The project included public meetings and an online survey prepared by GZA that drew more than 700 responses. Location: Greenwich, CT Completion Date: Spring 2024 Contact: Dr. Gregory Kramer, Superintendent of Parks and Tree Warden Owner & Address: Town of Greenwich, 101 Field Point Road, Greenwich, CT 06830 Phone: (203) 622-7824 Email: gregory.kramer@greenwichct.org 3. PROJECT: REDEVELOPMENT OF GREENLEAF PARK Description: GZA provided master planning services for the redevelopment of Greenleaf Park and assisted with grant application services. Upon receipt of $2.5M in funding from multiple sources, the City of Springfield contracted GZA to provide site civil engineering, landscape architecture, and ecological permitting services for the redevelopment of Greenleaf Park. Site improvements included a new accessible splash pad, two new accessible playgrounds with poured-in-place rubber safety surfacing, a redeveloped parking lot, culvert headwall reconstruction, and an extensive accessible walking trail system featuring a new pedestrian bridge. The project was completed in June 2024. Location: Springfield, MA Completion Date: June 2024 Contact: Laura Walsh, Senior Parks Planner Owner & Address: Dept. of Parks, Buildings, and Recreation Management 200 Trafton Road, Springfield, MA 01108 Phone: (413) 886-5186 Email: lwalsh@springfieldcityhall.com
Page 346
Proposal for Professional Engineering Services
Town of Granby
SECTION 1 Response Cover Sheet
07 COMPANY PROPOSAL
ATTACHMENT
A
Relevant Project
Experience
Page 347
P R O F I L E GZA- Who We Are Every day, GZA’s experts build on a legacy of trust through their personal commitment to excellence. Don Goldberg and Bill Zoino founded GZA in 1964 on the values of integrity, professionalism, and loyalty. Since then, the company has grown from a small consulting partnership to a major multi-disciplinary, employee -owned firm that focuses on environmental, geotechnical, ecological, water, and construction management services. With a staff of more than 800 people in 35 offices across the United States, we have completed over thousands of projects for a wide array of public and private clients for the past 62 years and counting. Because GZA experts are trained across disciplines, clients benefit from the knowledge and experience of all our staff and in-house resources who are available for every project at any time. With the ability to manage unpredictability, remain nimble, and mobilize quickly, GZA responds to client inquiries with urgency, sensitivity, knowledge and value, while remaining mindful of project costs and schedule. There is a free flow of information and support amongst our employees and offices, enabling us to provide every client with access to our extensive knowledge and experience base regardless of project location. Quite simply, the collective knowledge of the entire company is available to each client on every project for an experience that is uniquely GZA. Clients trust GZA because of our honesty, commitment to excellence , and ability to deliver expert solutions that help them succeed. T hey know that GZA helps reduce their project risks and strives to maximize results and value through comprehensive analysis each step of the way, regardless of the size or complexity of a project. It is why we are known for excellence, built on trust.
Page 348
GZA GeoEnvironmental, Inc. Page | 1 Walker Grandstand Springfield, MA Working as a subconsultant to architecture firm edmSTUDIO, GZA provided site design services for the renovation of the Walker Memorial Grandstand in Springfield’s Forest Park. The overall project included much needed structural improvements to the century-old building, as well as code compliance upgrades, restroom renovations, masonry repointing and reconstruction, site drainage improvements, and accessibility upgrades. The site improvements designed by GZA included upgrades to the dugouts to meet ADA requirements, site drainage improvements, and accessible walkways. By designing new accessible sloping paved walkways to the dugouts, GZA was able to preserve the historic structures while making them accessible. Stormwater on the site was managed with a system of area drains connected to new subsurface infiltration chambers. GZA provided design through construction phase services for the site improvements, working alongside an interdisciplinary team of consultants that included architects, surveyors, structural engineers, and MEP engineers. The project was completed in 2025. This successful project has extended the lifespan of the historic grandstand, allowing it to serve the Springfield community into the future. The project’s important accessibility upgrades have allowed the renovated grandstand to now be enjoyed by a much broader range of visitors. Project Highlights Accessibility Upgrades Drainage Upgrades Landscape Architecture Civil Engineering Coordination with Architecture Construction Phase Services GZA provided site design within a team led by edmSTUDIO for upgrades to the historic grandstand. Accessible ramps and walkways were added to the grandstand.
Page 349
GZA GeoEnvironmental, Inc. Page | 1 Challenge: The Town of Granby’s largest park was highly programmed and experiences high levels of visitorship, while the second largest park was underutilized. The Town needed a coordinated pair of master plans identifying best usage of these two public spaces, based on an understanding of the community’s current use and future goals for these parks. Solution: GZA provided services for site analysis, public engagement, and master planning for the two largest municipal parks in the Town of Granby. Through a review of GIS data, site plans, site visits, and interviews with Town staff and community stakeholders, GZA developed an understanding of the many programmatic uses of these two large parks, as well as existing infrastructure and site opportunities and constraints, and developed a pair of interrelated master plans which outlined a cohe- sive vision for coordinated prioritized improvements across the two parks. Recommendations included reconfiguration of select site elements for better usage of space, proposed upgrades to sports fields, accessibility improvements, hiking trails, playgrounds, and other park amenities. The master plans were accompanied by a summary memorandum describing steps for implementation and estimated ranges of costs for proposed improvements. Benefit: GZA’s master plan has enabled the Town to prioritize use of available resources, and implement site improvements as the opportunities arise, building towards a cohesive vision for Granby’s parks system. Recreation Facility Analysis Granby, CT Project Highlights Community Engagement Stakeholder Interviews Site Analysis Master Planning Landscape Architectural Design Client Contact: Sandy Yost, Director of Human Services Town of Granby 15 North Granby Road Granby, CT 06035 860-844-5351 syost@granby-ct.gov GZA prepared master plans illustrating coordinated, prioritized site improvements across Granby’s two largest parks.
Page 350
GZA GeoEnvironmental, Inc. Page | 1 Greenleaf Park is 46-acre public park located in Springfield, MA and hosts an assortment of playing fields, tennis, and basketball courts, parking lots, wooded areas and wetland resources. Challenge: The City of Springfield came to GZA to develop design drawings for new pickleball courts and a tennis court in the location of three existing tennis courts in poor condition. Solution: GZA’s landscape architects developed design alternatives that showed pickleball courts and a tennis court in multiple orientations to determine the best fit for the location. Ultimately, GZA landed on a layout with six (6) regulation pickleball courts, separated down the center by a 4-foot-tall chain link fence and one (1) regulation tennis court, separated by a 10-foot-tall chain link fence to keep balls from interfering. GZA provided bid phase and construction phase designer services, and the project was completed on time and within budget. Benefit: The City has benefited from these newly constructed pickleball and tennis courts, providing residents and users a free and accessible venue to recreate at in Springfield. Redevelopment of Tennis and Pickleball Courts at Greenleaf Park Springfield, MA Project Highlights Cost Estimation Landscape Architecture Civil Engineering Construction Phase Services Users enjoying the newly constructed pickleball courts with the tennis court located in the background. Mayor Domenic Sarno speaking at the ribbon cutting ceremony. Newly installed 10-foot-tall chain link fencing surrounding the new courts. Mayor Domenic Sarno and Department of Parks, Buildings, and Recreation Management Director Thomas Ashe playing a game of pickleball at the ribbon cutting ceremony.
Page 351
GZA GeoEnvironmental, Inc. Page | 1 The City of Springfield wished to enhance recreational opportunities, achieve universal accessibility, and implement climate-resilient design within the 166± acre Blunt Park, which hosts the popular Stone Soul Festival held annually on Labor Day weekend. Challenge: The City needed a site design that could be included in state and federal grant applications to fund implementation. The design would need to be constructed in phases and would need to meet Parkland Acquisition and Renovations for Communities (PARC) grant funding requirements. Solution: GZA prepared a master plan for the multi-phase redevelopment of Blunt Park, identified a feasible Phase I of development, and assisted with the grant application for funding. Upon the City’s receipt of $1.5M of funding from State and Federal sources, the City of Springfield hired GZA to provide landscape architecture, civil engineering, and wetlands permitting services for the project. GZA services included preparation of construction documents, permitting, and construction phase services. Phase I project improvements included improved ADA-compliant walkways, accessible playground featuring poured-in-place surfacing and engineered wood fiber safety surfacing, renovated pavilion, enhanced picnic grove, memorial/seating area, water play splash pad, six fully reconstructed tennis courts, upgraded utilities, improved site drainage and nature-based stormwater management, and resilient landscaping. Benefit: GZA’s full developed redevelopment project was completed on time and on budget. To enable a smooth construction phase process, GZA performed weekly site inspections and participated on-site job meetings to ensure that the project was completed in compliance with project documents and grant requirements. In the end the completed project exceeded the community’s expectations. Redevelopment of Blunt Park Springfield, MA Project Highlights Conceptual Master Planning Cost Estimation Grant Funding Application Assistance Landscape Architecture Civil Engineering Permitting Construction Phase Services Carefully designed ADA-accessible playground amidst existing oak grove New accessible playground Fully reconstructed tennis courts New seating/memorial plaza
Page 352
© GZA GeoEnvironmental, Inc. Page | 1 GZA provided a diverse range of consulting services in support to the PGA TOUR’s redevelopment of the TPC River Highlands Golf Course, a PGA Tour Championship level golf course, and subsequently its club house. The two projects were undertaken by the PGA to enhance the aesthetics and playability of the golf course and repair or replace aging infrastructure that had reached the end of its service life. The club house development project involves a full demolition of the existing club, and reconstruction of a much larger one. GZA served as the civil engineering and landscape architectural firm for the new club house’s site development. GZA’s services included civil and geotechnical engineering, wetland, environmental and stormwater permitting, landscape architecture, presentation at public meetings and construction phase support, including permit-required E&S control inspection and documentation. TPC River Highlands Golf Course Rehabilitation and Club House Redevelopment Cromwell, CT Project Highlights Civil Engineering Design and Permitting Natural Resources Assessment and Permitting Site Plan Approval Assistance Stormwater Pollution Control Plan (SWPCP) Preparation and Certification Construction Phase Erosion and Sediment Control Inspections. Landscape Architecture TPC River Highlands Golf Course Site Plan of new club house and its surrounding site. Site features include parking lot, golf cart storage, maintenance area, outside dining patio, walkways, retaining walls, native planting design, stairways, and underground stormwater infiltration system. GZA worked with the PGA, their architect, and their Contractor to design and permit the course redevelopment and club house project on accelerated timelines allowing the PGA to meet their required construction schedule (ability to initiate construction in Fall with completion in the spring of, allowing for uninterrupted the annual Traveler’s Championship Tournament. GZA successfully permitted the project with USACE, CT DEEP, and the Town of Cromwell (IWWA and Planning and Zoning) and provided stormwater compliance services as required under the CT Construction General permit. GZA then prepared and secured approval from CT DEEP of a Stormwater Pollution Control Plan (SWPCP) in accordance with the Connecticut General Permit and consistent with the Connecticut Guidelines for Soil Erosion and Sediment Control and the Connecticut Stormwater Quality Manual. The site development surrounding the new club house is due to begin in the Fall of 2018, with completion in Spring 2019. It involves low impact stormwater design, native planting design, ADA- compliant access routes, and reconfigured parking and drop-off areas.
Page 353
© 2016 GZA GeoEnvironmental, Inc. Site Development – Springfield Senior Center at Blunt Park Springfield, MA Project Highlights Sanitary Sewer, Water, Gas, and Electric Utility extensions from Roo- sevelt Avenue to the remote, undeveloped site requiring design review and approvals by the Spring- field Water & Sewer Commission and the City of Springfield’s DPW. Stormwater management designs treat stormwater in-place via infil- tration basins designed to store and infiltrate up to and including the NRCS 100-yr, 24-hour storm event. Comprehensive Site Civil and Land- scaping construction drawings and specifications and designer services during construction. GZA provided civil professional civil engineering and landscape architectural ser- vices for site design, and construction document preparation for a new City of Springfield Senior Center located off of Roosevelt Avenue in the City of Springfield, Massachusetts. The Springfield Senior Center project includes the construction of a new 28,000 SF, two-story building, designed by Timothy Murphy Architects, and associated land development on an undeveloped, wooded 4.9-acre parcel within a portion of the City of Springfield’s Blunt Park. GZA’s site civil / landscape architectural services included the design of paved ac- cess drives, 104-car parking facilities, stormwater management infiltration basins, pedestrian plazas, and landscaping. GZA also provided design of utility extensions from Roosevelt Avenue to the remote site, including extensive coordination with Eversource electrical utility, various communications providers including the City of Springfield’s fiberoptics network, the City of Springfield’s Department of Public Works, and the Springfield Water & Sewer Commission. The project is located within the City’s Blunt Park. Since the City had historically utilized Land and Water Conservation Fund grants to fund parkland improvements, use of the park to site a new Senior Center required approval from the National Park Service. GZA provided the required documentation for this intensive review process, including the preparation of an Environmental Assessment under the National Environmental Policy Act, leading to a Finding of No Significant Impact (FONSI).
Page 354
GZA GeoEnvironmental, Inc. Page | 1 GZA served the City of Springfield when the Elias Brooking Elementary School was severely damaged by a June 2011 tornado. The City needed to erect temporary classrooms in the athletic fields at the school in order to ensure that classes would be open on-time in the Fall. GZA was able to meet the hyper-accelerated schedule, rapidly determine an appropriate exploration program and mobilize a drilling subcontractor to complete test borings on short notice. GZA’s geotechnical work was on the critical path to successful project completion, and we were able to prepare a Report within the necessary timeframe, presenting our geotechnical recommendations for design and construction of the foundations for the temporary classrooms and temporary parking areas. After the City determined that it would be more cost effective to build a new school nearby rather than to repair the old school, GZA again provided geotechnical consulting services for the new building site. We designed and performed a subsurface investigation to address building foundations, retaining walls, parking areas and stormwater management. GZA helped the City address the widespread presence of unprepared fill and old foundation remnants at the site by preparing plans and specifications that allowed the City’s contractor to prepare the building pad site during the main thrust of design and bidding. Early site pad preparation was the key to the City being able to meet another aggressive timetable for construction. GZA provided full site civil and landscape design services including preparation of construction documents and specifications for the $27.5 million state-of-art-building’s site and grounds. The site features a large parking area, playground, ballfield, retaining walls, gathering areas, walkways, paved play area, and ass0cciated landscaping. Stormwater management design includes a combination of gray and green infrastructure, including a rain garden and swale for infiltration of stormwater runoff. The building and site were opened to the public in March 2015. Elias Brookings School Springfield, MA Project Highlights • Geotechnical Investigations, Recommendations, and Specifications • Phase I Environmental Site Assessment • Phase II Environmental Site Assessment • Site Civil Design Drawings and Specifications • Site Landscape Design Drawings and Specifications • Green Infrastructure Stormwater Management • Construction-Phase Design Services
Page 355
©GZA GeoEnvironmental, Inc. Page | 1 Development of Camp STAR Angelina Site Civil and Landscape Architecture Design and Permitting Springfield, MA Project Highlights Master Plan of Development Phase I Environmental Site Assessment Geotechnical Investigation, Recommen- dations, and Design Site Civil Engineering for Phase I of De- velopment Low-Impact Development (LID) Storm- water Management Design of Outdoor Amphitheater Landscape Architectural Design for Phase I of Development Wetlands Delineation, Assessment, and Permitting Utilities Design for Full Implementation of the Master Plan GZA provided site civil engineering and landscape architectural services for the first phase of development which included the new swimming pool, bathhouse, and camp infrastructure at the City of Springfield’s Camp STAR Angelina. The swimming pool includes a zero-entry interface for full accessibility along with multiple waterspray play features interspersed throughout the shallow end. Site development elements include multiple rain gardens and other low impact devel- opment practices, water distribution systems for fire protection and domestic supply, sanitary sewage collection and pumping station, new electrical infrastruc- ture for the camp, site lighting, and communications. In addition to the rain gardens, landscape elements include accessible parking and walkways, outdoor seating, picnic grove, and grass pavers for intermittent vehicular access to the bathhouse. The outdoor amphitheater includes a centrally-located fire pit and performance stage, with accessible routes to every seat. The $1.8M project was funded by the Commonwealth of Massachusetts through the state’s Signature Urban Parks Program, numerous communi- ty businesses, parents and friends of Camp STAR Angelina, and the Springfield Council for Cultural and Community Affairs. Camp STAR Angelina offers inclusive recreational programs for youth and young adults (ages 3-22) with and without disabilities. Phase I of the Master Plan was constructed 2014-2015 and became operational in August 2015. Funding for Phase II, including the Camp Lodge, is currently being secured. Facility Signage designed by GZA Zero entry pool with waterspray elements allows wheelchairs to enter directly into the water
Page 356
GZA GeoEnvironmental, Inc. Page | 2 Development of Camp STAR Angelina Site Civil and Landscape Architecture Design and Permitting Everett, MA GZA’s site design featured the use of Low-Impact Development (LID) stormwater management techniques. LID is a comprehensive land planning and engineering design approach with the goal of maintaining and enhancing the pre-development hydrologic regime of developing watersheds. LID works with nature to manage stormwater as close to its source as possible, and employs principles such as preserving and recreating natural landscape features, minimizing effective impervi- ousness to create functional and appealing site drainage that treats stormwater as a resource rather than a waste product. Practices used by GZA at Camp STAR Angelina include bioretention facilities, rain gardens, grassed swales, and permeable pavements. By implementing LID principles and practices, stormwater at Camp STAR Angelina is managed in a way that reduces the impact of the re-developed areas and promotes the natural movement of water within the Forest Park ecosystem and the watershed to nearby Porter Lake. Phase I Site Design Plan by GZA Rain Garden at Camp STAR Angelina Bioretention Area / Rain Garden
Page 357
GZA GeoEnvironmental, Inc. Page | 1 Since 2010 GZA has held an on-call contract with the City of Springfield for professional civil engineering, landscape architecture, geotechnical, and ecological permitting services. In that time, we’ve produced conceptual master plans and cost estimates for park development and redevelopment projects leading to millions of dollars in grant funding which in term led to over 100 successful construction projects. GZA praises the City of Springfield’s Department of Parks, Buildings, and Recreation Management for its stewardship of hundreds of acres of City-owned parkland. Our team of engineers, landscape architects, and scientists are honored to have worked with the City on projects including the construction of athletic fields, playgrounds, downtown pedestrian plazas, and trails, as well as creating educational landscapes, natural open space areas, and habitat restorations. Projects for which GZA takes great pride in for which we provided full design, construction document preparation, bid phase services and construction phase services for include playgrounds, picnic grounds, athletic fields, accessible nature trails, accessible paved multi-use paths, lakes and riverfront access, kayak launches, splash pads, paved sport courts, and fitness courses. We understand sustainability is intrinsic to the caretaking of open spaces and parks. By implementing sustainable design solutions with land management practices, the City of Springfield has been successful in protecting and enhancing the delicate web of nature that supports the places where we can connect with nature and each other. On-Call Professional Engineering and Design for Parks Department Springfield, MA Project Highlights Site Master Planning Services for Park Improvement Projects Cost Estimation Landscape Architecture & Civil Engineering Construction Documents Permitting Bid Phase Services Construction Phase Services Newly installed accessible walking trail to Porter Lake in Forest Park. Clifford A. Phaneuf Environmental Center at Forest Park Alden Street Park. Gunnery Sgt. Thomas J. Sullivan Park.
Page 358
GZA GeoEnvironmental, Inc. Page | 1 As subsequent implementation work, GZA’s multidisciplinary team completed a structural and building code compliance review of the existing boardwalk and prepared a summary report identifying its condition and practical steps to support its continued use as a public park amenity. GZA also surveyed surrounding vegetation, mapped areas dominated by invasive groundcovers, vines, shrubs, and trees, and prepared a vegetation management plan and planting plan to remove invasive species, reintroduce shade-tolerant native plants, improve ecological function, and enhance the historic landscape. Benefit: The master plan provided the Town with a prioritized framework for long-term stewardship of Pomerance and Tuchman Park, addressing trail erosion, invasive species management, climate resilience, historic preservation, signage, and wayfinding. Recommendations were organized by priority and approximate cost, with potential funding sources and installation and maintenance considerations. The subsequent boardwalk evaluation and landscape design advanced the plan into targeted implementation, providing practical, phased recommendations to preserve historic resources, improve visitor safety and experience, restore native biodiversity, and maintain this well-loved woodland park as a resilient public amenity. Pomerance and Tuchman Park Master Plan, Structural Evaluation of Boardwalk and Landscape Design Greenwich, CT Project Highlights Park Master Planning Community Engagement Ecological Management Historic Preservation Passive Recreation GIS Mapping and Analysis The Pomerance and Tuchman parcels contain existing hiking trails through a variety of environments, including Cos Cob pond and its dam (pictured above). GZA’s structural engineers reviewed the existing boardwalk for structural and building code compliance. Challenge: The site was the former estate of Ernest Thompson Seton, who helped establish the Boy Scouts of America, and later the home of Pulitzer Prize-winning author Barbara Tuchman. Remnants of the former estate and other historic structures now punctuate the wooded landscape as stone ruins, some maintained and others neglected. Now owned by the Town of Greenwich, the park is well-used for hiking, nature observation, and passive recreation. Increased visitation during the COVID-19 pandemic strained the site’s capacity and highlighted the need for a master plan to guide maintenance, ecological stewardship, historic preservation, and future improvements. After the master plan, the Town advanced one priority recommendation: evaluating the condition and future use of a historic pedestrian boardwalk connecting two hilltops. The boardwalk dated to the estate period, and the surrounding landscape had become dominated by invasive vegetation, affecting native biodiversity, resilience, and visitor experience. Solution: GZA prepared a master plan for the 100-acre municipal park in Greenwich, Connecticut, focused on ecological management, historic preservation, and passive recreation. GZA conducted an ecological field assessment, GIS mapping and analysis, review of the site’s history and planning background, and inventory of existing park amenities. GZA’s subconsultant, HPI, compiled a narrative timeline of the site’s history. GZA also led community engagement, including in- person public meetings and an online survey hosted by GZA that received more than 700 responses. The project team used this research and public input to develop master plan recommendations. GZA led public engagement during Master Planning Phase
Page 359
GZA GeoEnvironmental, Inc. Page | 1 Johnson Memorial Hospital Stormwater Construction Permit Stafford Springs, CT Project Highlights Submission of Stormwater Construction Permit Weekly Inspections during Construction with Additional Inspections after Significant Storm Events Turbidity Stormwater Sampling Completion of a hydraulic Capacity Evaluation Report Design of a 50,000-gallon per day Subsurface Disposal System. Construction Oversight GZA was contracted by a Connecticut hospital to design a new 50,000-gallon per day subsurface disposal leaching field. At the on-set of the project, the client was under a notice-of-violation (NOV). Their permitted 40,000-gallon per day of treated effluent was directed to failing open sand infiltration beds (oldest 1975) and the infiltration capacity was insufficient resulting in overflows. In addition to, the discharge effluent from the treatment facility exceeded applicable criteria. To resolve the NOV, GZA initially conducted a subsurface investigation to locate a large-scale infiltration leaching field. This included test pits, monitoring wells and the measuring of the seasonal groundwater elevations. These data were used to support a hydrogeologic report that calculated the seasonal high groundwater elevation and defined the hydraulic conductivity of the unsaturated and saturated subsurface soil. These data were inputted into a comprehensive 180-day mounding calculation (Modflow) to determine the maximum height of the radial mound that would form beneath the leaching field under 100- and 150% discharge capacity based upon a calculated infiltration rate. This hydraulic report was accepted by the reviewing agency. Once the hydraulic capacity analysis was completed, GZA was contracted to design the leaching field and associate components to discharge the treated effluent from the wastewater treatment facility to the leaching field. Because the new system was to be installed along a slope significant volume of import fill was required. GZA worked with the hospital’s contractor to ensure that the select leaching field fill met applicable state criteria, including sample verification from the contractor’s source. GZA observed installation of all the leaching field components, the select fill and the low permeable containment slope required downgradient of the field and included reviewing various contractor as-builds and submittals and final as-builds.
Page 360
GZA GeoEnvironmental, Inc. Page | 2 Johnson Memorial Hospital Stafford Springs, CT As part of the construction program, GZA was contracted to submit and oversee routine inspections of a General Permit for the Discharge of Stormwater and Dewatering Wastewater from Construction Activities. This includes defining the stormwater erosion and sedimentation controls that the contractor was responsible to maintain downgradient of the active leaching field construction, at an adjacent stormwater basin that was modification because of the mounding analysis, soil stock pile areas and downgradient of the steep slope. As part of these observations, GZA completed inspection reports submitted to the client and contractor. Weather during the construction activities was unusually wet requiring the contractor to maintain the erosion controls more frequently as identified within GZA inspection reports. In addition, several storm events resulted in breaches within the erosion controls that impacted wetlands and the upland wetland buffer zones. GZA made recommendations for restoration. GZA also monitored for turbidy on a monthly basis. All data was submitted to the town and the CTDEEP. The project was completed, and the state regulatory authority issued a permit for the discharge of 50,000-gallons per day of treated effluent.
Page 361
GZA GeoEnvironmental, Inc. Page | 1 The City of Springfield received funding through the American Rescue Plan Act (ARPA), specifically with Early and Secondary School Emergency Relief III funding to improve play amenities at a total of 25 different public educational facilities across the City. Challenge: GZA was tasked with providing 25 different full designs, cost estimation, preparation of construction documents, bid phase services and construction phase services, all which were separately bid and awarded to a variety of contractors. Solution: GZA’s landscape architects developed full bid packages for all 25 different schools and provided oversight throughout the entirety of construction at all of the separate facilities and with various contractors. Site improvements include new accessible playgrounds with poured-in-place rubber safety surfacing, a synthetic turf playing field, pavilions, landscaping, and an accessible walking paths and seating areas. Benefit: GZA’s successful implementation of design, bid phase services and construction phase services has led to vast improvements at Springfield public schools across the City. The project is nearing completion at all 25 different sites. Twenty-Five School Playgrounds Springfield, MA Project Highlights Landscape Architecture Civil Engineering Cost Estimating Playground Design Stormwater Design Bid Phase Services Construction Phase Services Newly constructed playground at Glenwood School in Springfield, MA. Accessible playground at Dryden School in Springfield, MA Accessible playground at Boland Elementary School in Springfield, MA Accessible playground at Indian Orchard Elementary School in Springfield, MA.
Page 362
Learn more at ceseng.com By the Numbers Who We Are Engineering A Brighter Tomorrow, For People + the Planet For more than 30 years, CES has transformed the built environment as trusted MEP/FP engineers—and as stewards of a sustainable future. With eight offices nationwide and a hands-on, interdisciplinary approach, we design systems that power spaces and uplift people. What We Do Designing Systems that Serve Life Sustainably At CES, sustainability is more than just a buzzword. We design MEP/FP systems that are both technically precise and deeply human-centered. From schools and hospitals to libraries and housing, our work prioritizes energy efficiency, climate resilience, and occupant well-being. Sustainable + Practical Solutions for the Built Environment Mechanical Electrical Plumbing Fire Protection Commissioning Net Zero Design Services Firm Profile 2 million+ kWh Solar PV + Hot Water 9,000+ Tons Geothermal 30+ Net Zero / Net Zero Ready BuildingsSelect Experience Town of Greenwich On-call Engineering Services Greenwich CT Town of Manchester + Glastonbury On-call Engineering Services Manchester + Glastonbury CT Town of Groton On-call Engineering Services Groton CT Town of South Windsor On-call Engineering Services South Windsor CT State of Connecticut On-call Engineering + Cx Services Statewide CT City of Ansonia On-call Engineering Services Hartford CT Town of Suffield On-call Engineering Services Suffield CT Town of Simsbury On-call Engineering Services Simsbury CT Stamford Public Schools On-call Engineering Services Stamford CT East Lyme Public Schools On-call Engineering Services East Lyme CT 80+ On-call Contracts
Page 363
CES is providing electrical and plumbing engineering design services for the redevelopment of city-owned waterfront property in Norwich into a vibrant public gathering space. The project transforms an underutilized site into a year-round community destination anchored by a combined splash pad and ice rink, a new restroom facility, and an event stage for public programming. CES’ scope includes plumbing utilities for the new toilet room and splash pad/ice rink, including domestic water and gravity waste piping. Electrical design serves the toilet room, splash pad/ice rink, and event stage, along with new site lighting for the parking lot, pedestrian areas, and stage. The design also incorporates a new security system with CCTV coverage to support safe use of the public space. Coordinated closely with the project’s civil engineer and architect, the development rounds out with utility and landscape improvements that reinforce Norwich’s investment in accessible, community-focused waterfront space. Norwich Waterfront Development Norwich CT New Life to the City’s Waterfront Scope New Construction Construction Cost $3.85 million Completion Est. 2027 Services Electrical Plumbing
Page 364
Harkness Memorial State Park is a magnificently preserved 230-acre Gilded Age estate featuring a 42-room Renaissance Revival mansion, world-renowned gardens, and sweeping waterfront views of Long Island Sound. Of the park’s 60 different structures, 15 are listed on the National Register of Historic Places. The Boarding House is one of several historic support structures on the property that served the estate’s operations. Having fallen out of active use, the building was renovated to return it to service as administrative offices for park staff. CES provided mechanical, electrical and plumbing engineering design services for the renovation. New electrical systems included a 120/208V, 3-phase underground service with generator interconnect for backup power, new LED lighting with occupancy sensor controls, and full fire alarm, access control, intrusion detection, and video surveillance systems. The existing oil-fired HVAC system and oil storage tank were removed and replaced with a new VRF system with two outdoor condensing units, multiple indoor fan coil units, electric cabinet unit heaters, and an energy recovery ventilator exhausting through the existing cupola. The existing well-based water supply was abandoned and replaced with a new municipal cold water service. New plumbing included two relocated bathroom groups with wall-hung water closets, lavatories, and point-of- use electric water heaters, and a new duplex sump pump in the existing basement pit. Harkness State Park Administration Building Waterford CT Restoring a Gilded Age Legacy Scope Renovation Construction Cost $2.8 million Size 2,880 sf Completion Est. 2026 Services Mechanical Electrical Plumbing
Page 365
CES held a 3 year on-call MEP/FP engineering services contract for the Town of South Windsor. Projects included: Community Center Replacement of five oil fired boilers (two domestic + three heating) with natural gas condensing boilers and controls integration Conversion of one Kitchen MAU, including controls integration Removal of oil piping and oil pumps inside the building Police Central plant replacement and optimization Heat pump and cooling tower replacement Town Garage Conversion of 2 existing garage bays into heated workshop/garage Town Hall Study Existing conditions study of 2nd floor of Town Hall Town of South Windsor On-call Services South Windsor CT Engineering On Demand Scope On-call Construction Cost Various Size Multiple/Various Completion 2019-2022 Services Mechanical Electrical Plumbing Fire Protection
Page 366
A comprehensive facility assessment was completed for the town of Simsbury. The existing conditions of 52 municipal buildings and 7 schools were assessed. The study included an existing conditions assessment, 10 year capital improvement, and a maintenance plan. The town is using the report as a strategic planning tool for detecting and prioritizing improvements. At the study’s conclusion, the town decided to refresh each of the schools using a neighborhood model, reconfiguring each elementary school as a district PreK-6. CES provided MEP/FP engineering design services to identify existing HVAC equipment and it’s useful life expectancy, detect deficiencies related to life safety systems, codes, envelope, indoor air quality, lighting, and HVAC systems. After the initial assessment, CES provided recommendations on the most economical approach to equipment maintenance and replacement. Town of Simsbury Municipal + Schools Study Simsbury CT Basis for Strategic Planning Scope Study + Masterplan Size 1,040,000 sf Total 725,000 sf 7 Schools 315,000 sf 52 Municipal Buildings Completion 2019/2020 Services Mechanical Electrical Plumbing Fire Protection Buildings 7 Barns + Sheds, Salt Shed 1 Boat House 2 BOE Building + Grounds Facility 1 Boy Scout Hall 1 Commuter Bus Shelter 9 Garages, Maintenance Buildings 1 Library 5 Memorial Rec Center 2 Park + Golf Maintenance 3 Pavilions + Gazebos 2 Performance Art Center 5 Pump Houses 6 Residential Buildings 1 Senior Center 7 Schools 4 Simsbury Farms Rec Complex 1 Town Hall 1 Water Pollution Control
Page 367
WHO WE ARE At edmSTUDIO, our mission is simple: to work collaboratively, deliver designs that exceed expectations and have fun along the way. We’re a group of curious designers who believe that every detail matters. Whether it’s a bold new idea or a subtle refinement, we know that it’s the details that make all the difference. From the first conversation to the final ribbon- cutting, we’re passionate about creating spaces that are functional, beautiful and deeply meaningful. LISTEN C AREFULLY CREATE JOYFULLY CARE DEEPLY INFUSE EVERY PROJECT WITH CURIOSITY AND ENTHUSIASM. UNDERSTAND WHAT'S IMPORTANT TO YOU. STRENGTHEN THE COMMUNITIES WE SERVE. Our collaborative approach always begins with listening—because it's often the smallest insights that can spark the biggest breakthroughs. When you work with us, you’re partnering with a team that’s as invested in your vision as you are. #8 LARGEST ARCHITECTURE FIRM IN GREATER HARTFORD
Page 368
edmSTUDIO provided design services for the renovations and addition to the existing pool building at Veterans Memorial Park in Middletown, CT. The scope of the project consists of a reconfiguration of the existing public facilities with the bathhouse and an addition of new staff spaces that support oversight of the pool. The renovation also included upgrades to the utility infrastructure within the building that supports the new swimming pool and splash pad. With a focus on making a more impactful first impression, we’ve incorporated large graphic signage and a contemporary glassy main entry that will instantly engage visitors upon arrival. To blend in with the beautiful park surroundings, we’ve added a shaded wood pergola, offering a cozy spot to relax. The building itself boasts “sho sugi ban” siding, a classic touch that ties it to nature, giving the facility a warm and natural feel. Together, these features create a delightful space where modernity meets the tranquility of the park. OWNER CONTACT City of Middletown Catherine Lechowicz (860) 638-4505 catherine.lechowicz@ middletownct.gov MIDDLETOWN, CT VETERANS MEMORIAL PARK
Page 369
edmSTUDIO provided design services for a new bathhouse and pool for Hamilton Park in Waterbury, CT. This is the first and most important phase of a larger plan to revitalize the entire park over the next decade. The bathhouse is strategically placed to provide views from the new “promenade,” ensuring safety and excitement as you enter the park. A large solar canopy serves as a covered entryway and welcoming landmark and generates enough solar power to keep the entire facility running during the sunny summer months. Inside, patrons will be greeted by an abundance of natural light, creating a welcoming and bright atmosphere. We’ve carefully chosen durable materials to hold up to the test of time, but also have included building components like glulam wood beams and tongue & groove wood decking to ensure the bathhouse pay tribute to the city’s historical bathhouses, connecting the new design with the City’s roots. To make the bathhouse truly special, a public art mural will be displayed on the main exterior facade. This mural not only adds beauty but also fosters a sense of ownership and community integration, making the building a beloved part of the neighborhood. OWNER CONTACT City of Waterbury John Kollar (203) 232-5790 WATERBURY, CT HAMILTON BATHHOUSE
Page 370
Our team served as the architect for the $4 million renovation of the Wa lker Memorial Grandstand in Springfield’s Fore st Park. The century- old structure had experienced significant deterioration, including failing brick piers, compromised structural support systems, and wi despread envelope deficiencies. Scope of work included masonry repointing and reconstruction, structural stabilization, roof and envelope repairs, and modernization of the dugouts to meet ADA requirements. The pr oject also addressed essential building infrastructure and code compliance upgrades. Public restrooms were fully renovated to i mprove accessibility and capacity, drainage systems were mo dernized, and circulation was reconfigured to support universal a ccess. As the project lead, we directed the coordination of mechanical, electrical, plumbing, civil, and landscape systems, ensuring seamless integration with the historic fabric of the facility. Th e completed project stabilized a historically significant structure a nd extended its service life while enhancing functionality for athletes, sp ectators, and the broader community. OWNER CONTACT City of Springfield Peter Garvey (413) 787-6445 WALKER GRANDSTAND SPRI NGFIELD, MA
Page 371
edmSTUDIO provided design services for the replacement of the concession stand and press box at Memorial Field Park. The structure will meet accessibility requirements and includes a new wheelchair lift to the second floor press box. Careful attention was made to maintain existing view lines from the press box to fields on both sides of the structure. The new concession service area was planned to maximize functionality and service by the all-volunteer staff. OWNER CONTACT Town of Agawam Jennifer Bonfiglio (413) 726-9742 AGAWAM, MA MEMORIAL FIELD PARK CONCESSIONS
Page 372
edmSTUDIO provided architectural services for the phased renovation of the Page Park Pavilion, a popular community gathering and event facility located within Bristol’s Page Park. The project was focused on modernizing the existing pavilion to improve functionality, occupant comfort, accessibility, and energy performance while preserving its role as a valued destination for public events and community activities. Renovations included upgrades to the building’s mechanical and electrical systems, enhanced interior and exterior lighting, accessibility and code compliance improvements, and building envelope enhancements. Interior improvements support the pavilion’s event space, kitchen, restrooms, and support areas, creating a more comfortable and welcoming environment for visitors while extending the life of the facility. OWNER CONTACT City of Bristol Dr. Joshua Medeiros (860) 584-6195 BRISTOL, CT PAGE PARK PAVILION RENOVATIONS
Page 373
edmSTUDIO provided design services for the renovation of the bathhouse facilities at Washington Park and Fulton Park as part of the City of Waterbury’s comprehensive modernization of two of its signature public swimming complexes. The projects transformed aging bathhouse buildings into modern, accessible support facilities serving newly reconstructed public pools while respecting the character of the surrounding historic parks. Renovations included upgrades to the building envelopes, interior spaces, accessibility features, and building systems, creating welcoming facilities that better serve residents and visitors during the summer recreation season. OWNER CONTACT City of Waterbury John Kollar (203) 232-5790 WATERBURY, CT WASHINGTON & FULTON PARK BATHHOUSES
Page 374
edmSTUDIO is providing architectural services for the redevelopment of Howard T. Brown Memorial Park, supporting the transformation of the park into a vibrant, year-round community destination. The project includes the design of a combination splash pad and seasonal ice rink, complemented by support structures for equipment storage and operations. The project also features ADA-compliant self-cleaning public restrooms, a permanent event stage, and comprehensive site improvements, including enhancements along the Heritage Trail, utility infrastructure upgrades, and the integration of park-wide security cameras. edmSTUDIO is responsible for the architectural design, construction documentation, and multidisciplinary coordination necessary to successfully deliver these amenities as part of the park’s overall revitalization. OWNER CONTACT NCDC Kevin Brown (860) 884-9171 kbrown@askncdc.com NORWICH, CT HOWARD T. BROWN MEMORIAL PARK WATERFRONT REVITALIZATION
Page 375
MACCHI ENGINEERS, LLC Diversified Structural and Civil Engineering Services ON-CALL ENGINEERING EXPERIENCE Our firm‘s on-call expertise includes a wide range of services for new construction, additions and renovations, repairs, code compliance, structural analysis, survey, and construction administration. Some structural services include new designs, third party structural review, forensic analysis, seismic analysis, feasibility studies, load rating, code updates, repairs, rehabilitations, renovations and additions. We provide a wide range of civil/site services for roadway, sidewalk and parking layout and design, hydrologic and hydraulic studies, storm drainage, utility relocation and coordination, and traffic engineering. We have experience with surveys, environmental permitting, water resources, traffic engineering, construction administration and on- site inspection. Our firm also has the capacity to provide survey and mapping services, boundary surveys, easement maps, geotechnical services, and soil testing analyses, HVAC and MEP, architectural modifications and landscaping services Macchi Engineers provides on-call structural engineering services for many diverse structures including parking garages, educational facilities, office buildings municipal facilities, dams and bridges. Some services include structural inspections and analysis, new structural designs, repairs, rehabilitations, renovations and additions. Our firm‘s advanced technology includes the use of the latest AutoCAD software and Building Information Modeling (BIM) using Revit Software. Our professionals remain cognizant of new materials and construction methods, which allow our studies of each project to include in-depth evaluations of functional, technical and economic aspects. Additionally our design professionals are familiar with FEMA guidelines and the Homeland Security “Building and Infrastructure Protection Series” for the design of safe schools. We believe that the identification of potential hazards related to each project site whether a natural threat or terror related is a critical element that needs to be addressed in the initial planning phase of a project. Capitol Region Council of Governments (CRCOG), Hartford, CT As a qualified vendor we provide structural engineering services for homeowners located in the areas with known defective concrete consisting of the mineral Pyrrhotite. Our services include visual inspections and evaluations of existing foundations documenting our findings in a letter report. Based on our findings we can advise homeowners and/or homebuyers on the next steps in this process. We can develop plans and provide cost estimates and assist with the coordination of core sampling and testing. We have provided more than 500 visual foundation inspections for private homes throughout the affected towns. Town of Vernon, On-Call Structural Inspection Services, Ellington, Stafford Springs and Vernon, CT Provided on-call structural engineering services in Ellington, Stafford Springs and Vernon, CT. Work performed under this agreement visual inspection of the exterior and interior foundation walls and slabs on grade of residential properties. Provide a stamped engineering letter report documenting the findings with recommendations. Also provided the coordination of core sampling and petrographic analysis. We have provided more than 40 visual foundation inspections for this on-call contract. Webster Bank, N.A., On-Call Structural Inspection Services, Waterbury, CT Providing on-call structural engineering services in the Connecticut and Massachusetts areas for Webster Bank. Work performed under this on-call agreement is to inspect and evaluate the structural soundness of residential properties that the bank may have an interest in. Services include a visual inspection of the exterior and interior foundation walls and slabs on grade of residential properties. Provide a stamped engineering letter report documenting the findings with recommendations. Additional work may include the coordination of core sampling and petrographic analysis. We have provided more than 300 visual foundation inspections for this on-call contract. THE TOWN OF DANBURY Structural engineering support services for various projects services including inspection and analysis, structural design, structural threshold review. THE TOWN OF WEST HARTFORD Continuous engineering support services for various projects for more than 30 years. Work includes structural design for new construction, repairs and renovations, code updates, and construction administration. STATE OF CT, DEEP, DAS/CS, CSU, CTC, & UCONN Structural engineering support services for more than 40 years including inspection and analysis, structural design, structural threshold review, and construction administration. Provided engineering support to numerous Community / Technical Colleges throughout the state and for each of the state’s universities. RTX / UTC / PRATT & WHITNEY ON-CALL STRUCTURAL & CIVIL ENGINEERING SUPPORT SERVICES (for more than 40 years) some services included: Load Capacities for Levalators Third Party Review of Jib Cranes Structural design for fall protection systems Catwalk, Roof and Platform Design Provide Conduit Routing Plan for Lighting and Sprinkler Systems Inspection and design of bridge crane systems
Page 376
Sleeping Giant State Park Visitors Center Hamden, CT REFERENCE: Mr. David Cooley, P.E. Supervising Civil Engineer Engineering and Field Support Services Bureau of Central Services Connecticut DEEP 163 Great Hill Road Portland, CT 06480 David.cooley@ct.gov PRINCIPAL-IN-CHARGE: Michael Plickys, P.E. CHIEF CIVIL ENGINEER: Herbert S. May, P.E. PROJECT DURATION: 2023-2026 CONSTRUCTION SCHEDULE: 90 Days / final 150 Days BUDGET: $500,000 TO $ 1,000,000 BID COST: $893,362 FINAL COST: $937,806 DESCRIPTION: The project consists of the design services for a new visitor’s center cabin kit to be erected at the Sleeping Giant State Park in Hamden. Also potential replacement of damaged bathroom building. Project area consist of 1+ acre and includes all the supporting utility infrastructure such as electrical, water, plumbing, services and subsurface improvements. Macchi Engineers is responsible for the structural and civil design services and subconsultant coordination for MEP and Geotechnical Engineering. Project Experience
Page 377
Town of West Hartford Projects REFERENCE: Mr. Christopher Oliver Manager of Maintenance Services 17 Brixton Street West Hartford, CT 06110 860-561-7927 Chris.Oliver@westhartfordct.gov PRINCIPAL-IN-CHARGE: Michael Plickys, P.E. DESCRIPTION: Our Firm has provided on-call structural and civil engineering support services to the Town of West Hartford for more than 30 years on various projects. Some recent projects include: Morley School, Performed structural design for wall damage redesign (2026) Bristow School, Structural engineering services (2026) Rockledge Golf Club, Structural design services for new driving range (2025-2026) Conard High School, Performed inspection of loading docks (2022) Fire Department Training Tower, Performed structural inspection services (2022) Fire Station #3, Performed site inspection and repairs (2022) Sedgewick Middle School, Performed inspections and drawings for bathroom (2022) St. Brigid School, Performed structural inspections and assessment (2021) Project Experience Westmoor Park Barn (2015-2016) Provided the structural investigation and design services for repairs to portions of the exterior and interior of an historic 2-story timber framed barn structure. Also provided structural evaluation of roof structure and construction administration and inspection services. Cornerstone Pool Roof Reconstruction (2018-2020) Provided the structural investigation and design services for installation of a new pool roof.
Page 378
Proposal for Professional Engineering Services
Town of Granby
07 COMPANY PROPOSAL
07 COMPANY PROPOSAL
ATTACHMENT
B Resumes
Page 379
GZA. Known for excellence. Built on trust. Education B.S., 2003, Civil Engineering, Lehigh University M.S., 2006, Geotechnical Engineering, University of California Licenses & Registrations 2008, Professional Engineer, Massachusetts, #47719 2014, Professional Engineer, Connecticut, #PEN.0030556 2016, Professional Engineer, Vermont, #018.0117996 2016, Professional Engineer, New York, #096236 MA Solid Waste Facility Third Party Inspector TIPX263211 Nuclear Density Gauge Certified 49 CFR 172 (H) Areas of Specialization Geotechnical Engineering Site/Civil Engineering Stormwater Management Subsurface Investigations Solid Waste Management Construction Monitoring Construction Management Environmental Permitting Affiliations/Memberships Member, American Society of Civil Engineers (ASCE/G-I) Association of Dam Safety Officials Boston Society of Civil Engineers Training OSHA 40-Hour Trained OSHA 10-Hour Trained OSHA 8-Hour Supervisor Trained Page | 1 Nathaniel L. Russell, P.E. Associate Principal / Civil & Geotechnical Engineer Summary of Experience Mr. Russell is a Senior Civil and Geotechnical Engineer and leads GZA’s Civil and Geotechnical Engineering practice in GZA’s Springfield, Massachusetts office. Mr. Russell has extensive experience providing professional engineering services on complex projects involving site/civil (land development) engineering, geotechnical engineering and design, site investigations, landfill design and permitting, subsurface exploration programs, design of shallow and deep foundation systems, design of ground improvement systems, retaining walls, temporary support of excavation systems, as well as performing and overseeing construction monitoring. Mr. Russell’s experience includes Site/Civil and Geotechnical Engineering, Site Investigations, Landfill Design and Permitting, Stormwater / ESCP Design and Permitting, Wetland Permitting, Environmental Remediation / Brownfields Redevelopment, Alternative Energy Site Development (Solar, Battery Energy Storage and Geothermal), Construction Management / Construction Quality Assurance, and Litigation Support. Geotechnical experience includes developing and executing or overseeing subsurface exploration programs, design of shallow and deep foundation systems (spread footings, steel H-piles, timber piles, micro piles, and helical piles), MSE retaining walls, estimating settlements, and preparing design-phase reports, design and specification of temporary support of excavation systems (soil nail wall and soldier pile/lagging), as well as performing and overseeing construction monitoring. Construction phase experience includes geotechnical inspection and site preparation including deep and shallow foundation systems, major earthwork projects (excavation and filling), rock removal (blasting). He has performed field inspection and laboratory testing for asphalt, soils, concrete, groundwater, and other construction materials. Relevant Project Experience Civil & Geotechnical Engineer, TPC River Highlands Golf Course, Cromwell, Connecticut. Mr. Russell leads GZA’s project team providing engineering and permitting support to the PGA TOUR’s redevelopment of the TPC River Highlands Golf Course, a PGA TOUR Championship level golf course. The phased project is being undertaken by the TOUR to enhance the aesthetics and playability of the golf course, repair and replace aging infrastructure that had reached the end of its service life and reconstruct the existing clubhouse building. GZA’s services have included civil and geotechnical engineering, hazardous building material assessment, wetland, environmental and stormwater permitting and representation at public meetings. GZA assisted the TOUR to design and permit the golf course redevelopment portion of the project on an accelerated timeline allowing the PGA to meet their required construction schedule (ability to initiate construction in Fall 2015 with completion in the spring of 2016 prior to the Traveler’s Championship). GZA permitted the project with USACE, CT DEEP, and the Town of Cromwell (IWWA and Planning and Zoning) and is providing stormwater compliance services as required under the CT Construction General permit.
Page 380
Nathaniel L. Russell, P.E. Associate Principal / Civil & Geotechnical Engineer GZA. Known for excellence. Built on trust. Page | 2 GZA assisted with the design, permitting and construction of the new 39,000± square foot clubhouse. GZA provided site civil, geotechnical, hazardous building material assessment, permitting and construction administration services for the project. As part of this work, GZA also prepared designs for and obtained permits for temporary administrative and member/guest services facilities to allow the golf course to maintain operations during reconstruction of the clubhouse. GZA also provided the design and permitting services for replacement to the golf course irrigation water supply line that required installation of a new pipeline by pipe jacking (jack and bore) under an active railroad line. GZA developed plans and specifications, prepared railroad permit applications and provided construction observation during the work. Principal In Charge, Civil/Geotechnical Engineer, Woods Hole Ferry Terminal Reconstruction, Falmouth, Massachusetts. GZA is providing extensive engineering support to the Steamship Authority (SSA) for the ongoing +$150-million reconstruction of Woods Hole Ferry Terminal and relocation of their administrative offices to an off-site location. Mr. Russell is managing GZA’s civil engineering services for the phased reconstruction of the Ferry Terminal, including replacement of all three slips (completed), and new terminal storage buildings (under construction), The project included design of a new MassDEP compliant stormwater management system, new utility services (water, electric, communications and sanitary sewer) and associated infrastructure improvements. As part of the project, GZA assisted with the civil and geotechnical design for SSA’s new 20,000-sf administrative office building and temporary terminal to relocate their administrative services and operational personnel. Mr. Russell also assisted with the permitting of the project with local, state, and federal regulators, including filing a wetlands Notice of Intent (NOI), Chapter 91 license and Section 401 Water Quality Certification. Principal-in-Charge, Stanley Quarter Park Pond Dredging and Restoration Project, New Britain, Connecticut. Mr. Russell was heavily involved in the construction phase of this project, which included bathymetry, sediment sampling, plan development, permitting, and bid and construction phase services. This project was for dredging of a pond which is more than 7 acres in extent within a major park resource within the Town. The project also looked at the potential for water quality improvements for the pond. Principal in Charge, New Playground Facilities at Public Elementary Schools, Springfield, Massachusetts. Principal in charge for design and construction of twenty-five school playground projects with a construction budget of approximately $12mm funded by the Elementary and Secondary School Emergency Relief III grant. The GZA team successfully lead design and construction of the construction project administered by the City of Springfield. GZA provided civil engineering (site design, stormwater management and geotechnical), landscape architecture and construction management services for the project. Civil/Geotechnical Engineer, Department of Emergency Services and Public Protection (DESPP) Firearms Training Facility Reconstruction Project, Connecticut. Managed GZA’s civil engineering and geotechnical services in support of the pre-design study for the proposed reconstruction of the CT State Police’s existing firearms training facility. Geotechnical Engineer, Bushnell South Parking Garage, Hartford, Connecticut. Project consisted of construction of a 6-story parking garage in Hartford supported on H-piles with ultimate capacities of up to 894 kips. The H-piles consisted of HP14x117 and HP12x84. The piles were driven up to 50 feet to bedrock. Mr. Russell led GZA’s geotechnical services including subsurface explorations, pile design, and construction phase services including review of contractor submittals, observation and logging pile installation, and pre-production PDA testing. Geotechnical Engineer, North Riverfront Park, Springfield, Massachusetts. Mr. Russell led the geotechnical evaluation of a proposed ramp on the levee system sideslope for access to an existing bike path and design of site retaining walls and building foundations. The project involves construction of new retaining walls and placement of fill over the riverside slope of a levee that is an integral part of the City of Springfield’s flood control system. As part of the project GZA obtained Section 408 approval from the USACE.
Page 381
GZA. Known for excellence. Built on trust. Education M.S., 2012, Landscape Architecture II, University of Washington B.S., 2009, Landscape Architecture, University of Massachusetts Licenses & Registrations Professional Landscape Architect, MA #4321 (2019) MA Municipal Vulnerability Preparedness (MVP) Provider (2017) Areas of Specialization Landscape Architecture Construction Phase Services Cost Estimation Graphic Design * Project completed at a previous firm Page 1 Dan Shaw, PLA, MVP Landscape Architect Summary of Experience Mr. Shaw is a landscape architect registered in Massachusetts. His work focuses on designing outdoor spaces that inspire people to form connections with their natural environments and their communities. He has designed landscapes for a range of clients including architects, municipalities, and state agencies. Dan’s background has given him broad knowledge in designing public spaces, parks, trails, playgrounds, and waterfronts. Dan is a designer and collaborator who is skilled in project management, participatory design, public engagement, and creative problem solving. He performs site analysis, conceptual design, cost estimates, construction documentation, construction observation, grading design, graphic production including freehand sketching, and interdisciplinary coordination on complex projects. He is knowledgeable in green infrastructure, resilience planning, built environments that promote health, ecological restoration, and planning at both neighborhood and regional scales. Project Experience Project Manager and Landscape Architect, Pomerance and Tuchman Park Pedestrian Bridge, Greenwich, Connecticut. Dan led the design of improvements to a portion of an historic municipal park containing a pedestrian bridge over a small, wooded ravine. Project included structural evaluation and code compliance review of the bridge, and landscape design for the surrounding area including management of invasive species. Project Manager and Landscape Architect, Memorial Park Planning Project, Hardwick, Massachusetts. Dan led the development of a series of conceptual site design options for improvements to a park in the mill village of Gilbertville, located in Hardwick, MA. Services included existing conditions assessment, public meetings, an online survey, and development of conceptual design alternatives and cost estimates. Project Manager and Landscape Architect, Anniversary Hill Park Trail Mapping, Holyoke, Massachusetts. Dan led the development of a map of existing trails throughout an 88-acre woodland park. Project included recording existing trail routes in the field using hand-held GPS equipment, and creation of a GIS map of park trails for the City to include in park trail kiosks. Project Manager and Landscape Architect, Granby Recreation Facilities Analysis, Granby, Connecticut. Dan led the development of master plans for the Town’s two largest public parks. The project included an inventory of existing recreational facilities and other site features, interviews with stakeholders, public meetings, and development of master plans including estimated costs, proposed phasing, and a summary memorandum describing next steps for implementation. Project Manager and Landscape Architect, Mittineague Park East Entrance, West Springfield, Massachusetts. Dan is currently leading the design of a ten-acre area at the east end of a large Town-owned park. The project includes design development and cost estimating for new ballfields, playgrounds, splash pad, concessions building, accessible walkways, relocated utilities and driveways, and other site improvements. Services also include construction documentation for a first phase of improvements.
Page 382
Dan Shaw, PLA Landscape Architect GZA. Known for excellence. Built on trust. Page 2 Project Manager and Landscape Architect, Alden Street Park, Springfield, Massachusetts. Dan led the design of improvements to a City-owned park on the shore of Lake Massasoit in Springfield. Design included an accessible walkway, picnic areas, and fishing deck. Project included wetlands delineation and permitting. Project Manager and Landscape Architect, Harriet Tubman Park, Springfield, Massachusetts. Dan led the design of improvements to a City park on the shore of Lake Massasoit. The design included a new playground, exercise area, amphitheater, picnic pavilion, basketball court, and fishing area. Services included conceptual design, cost estimating, wetlands delineation and permitting, construction documentation, and construction phase services. The project completed construction in 2025. Project Manager and Landscape Architect, Improvements to Playgrounds in West Springfield, Massachusetts. Dan led the design of a series of new playgrounds for the Town of West Springfield. Project included conceptual design through construction documents for nine sites, cost estimating, permitting, and construction phase services. Four of the sites received funding for implementation, and finished construction in 2025. Project Manager and Landscape Architect, Barrows Park, Springfield, Massachusetts. Dan led the design of a new playground and accessible walkways in a City-owned park. The design introduces engaging, accessible, and high play-value play climbing equipment into a previously under-utilized neighborhood park. Project included conceptual design, cost estimating, construction documentation, and construction phase services, and completed construction in 2025. Project Manager and Landscape Architect, Nahorniak Park, Springfield, Massachusetts. Dan led the design of a new playground in a City-owned park. The small project site is constrained by existing topography, utilities, and walkways. By creatively selecting and locating the playground features, the design creates a new playground that fits seamlessly into the existing park. The project finished construction in 2025. Project Manager and Landscape Architect, Borgatti Park Pickleball Courts, Agawam, Massachusetts. Dan led the design of new pickleball courts, walkways, and park pavilion in a town-owned park. Project included master planning, cost estimating, construction documentation and construction phase services. Project Manager and Landscape Architect, Conant Park Master Plan, Southampton, Massachusetts. Dan led the development of a master plan for a 23-acre town-owned park that includes ballfields, playgrounds, walking trails, drainage improvements, historic features and a pavilion and picnic areas. Project included prioritization of improvements, illustrative master plan, and cost estimate. Project Manager and Landscape Architect, Pomerance and Tuchman Master Plan, Greenwich, Connecticut. Dan led the development of a master plan for a 100-acre Town owned open space. The project included existing conditions assessment of historic ruins, ecological conditions, hiking trails and visitor amenities. The project produced a master plan with recommendations for future capital improvements and ongoing maintenance for this unique and historic park, including trail improvements, accessibility upgrades, and historic preservation, as well as measures to increase climate resilience and biodiversity. Landscape Architect, Blunt Park, Springfield Massachusetts. Dan worked with a team at GZA on improvements to the central area of a large City owned park, including providing design services for a cultural commemorative garden for the Stone Soul Festival, an annual African American music and arts festival held in the park each year. Project design also included playgrounds and a splash pad in a woodland setting, including tree protection and careful siting of paths and park improvements. Landscape Architect, Magazine Park Master Plan, Springfield, Massachusetts. Dan led the development of a master plan for a 3.1-acre neighborhood park owned by the City of Springfield, MA. The plan proposed a series of updates to the park which will create a more inviting, well-used space, while re-organizing the currently haphazard layout of park features. Clear entrances and walkways, improved visibility, distinct spaces for different user groups, and upgraded playgrounds and amenities will make the park more welcoming to a wider range of neighborhood residents. GZA is currently providing full design and construction documentation for implementation of the plan.
Page 383
GZA. Known for excellence. Built on trust. Education B.S., 2005, Landscape Architecture, University of Massachusetts- Amherst Licenses & Registrations 2011, State of Connecticut, Registered Landscape Architect, #1198 2012, Commonwealth of Massachusetts, Registered Landscape Architect, #4000 2017, State of Rhode Island, Registered Landscape Architect, #0647 2019, State of New Hampshire, Registered Landscape Architect, #00177 2026, State of New York, Landscape Architect, #003353 Certifications & Specialized Training WEDG (Waterfront Edge Design Guidelines) Affiliations/Memberships American Society of Landscape Architects (ASLA) Boston Society of Landscape Architects (BASLA) Waterfront Edge Design Guidelines Areas of Specialization Master Planning Site Design Planting Design Construction Document Preparation Designer Construction Phase Services Cost Estimation Graphic Design Page | 1 Anja Theresa Ryan Duffy, PLA, WEDG Senior Project Manager / Professional Landscape Architect Summary of Experience Anja leads a team of landscape designers within GZA specializing in creating outdoor spaces that are safe, accessible, aesthetically pleasing, and resilient. Her experience includes the production of conceptual site plans, graphic presentations, and preparation of construction documents for a variety of public and private site development and open-space restoration projects. Her broad technical knowledge has enabled her to successfully manage interdisciplinary projects. Anja’s approach to landscape design stems from nature-based design philosophy, combined with an understanding of how people use and enjoy outdoor spaces. Her landscape designs have resulted in ecological restorations, public parks, nature trails, and vibrant urban pedestrian spaces. Project Experience PUBLIC PARKS & OPEN SPACE Project Manager and Lead Landscape Architect, New Playground Facilities at Twenty-Five Public Elementary Schools, Springfield, Massachusetts. Led design and performed project management for the design for improvements to twenty-five school playground projects funded by the Elementary and Secondary School Emergency Relief III grant. Anja led a team in designing and developing bid-level construction documents for each school. She performed project management for all 25 projects which were all bid and finished in one construction season. The average cost of development for each playground development project was about $500,000. Project Manager and Landscape Architect, Putnam Technical Academy High School Artificial Turf Athletic Field, Springfield, Massachusetts. Led design and performed project management for the development of an artificial turf athletic field funded by the Elementary and Secondary School Emergency Relief III grant. Project Manager and Lead Landscape Architect, Blunt Park, Springfield, Massachusetts. Anja led the design effort, beginning with conceptual master plan leading to full development of bid-level construction documents for the $1.5 million redevelopment project of Blunt Park. Anja led a team of GZA civil and geotechnical engineers and wetland scientists for the design and permitting of site improvements and stormwater management systems. She led and performed designer phase construction phase serves. Project site improvements include new accessible walkways, playground, renovated picnic pavilion and picnic grove, water spray play areas, parking lot improvements, landscaping, site furnishings, and signage. Project Manager Lead Landscape Architect, Kenefick Park, Springfield, Massachusetts. Anja led design, staring with conceptual master plan to full design, preparation of construction documents, and managed designer construction phase services for a multi-phase $1.75 million park redevelopment project. Site improvement included accessible pedestrian connections, parking lot, splash pad, playground, picnic pavilion, softball field, basketball courts, handball wall, site furnishings, site utilities, irrigation, and landscaping. The final phase of the multi-phase project was completed in September 2024.
Page 384
Anja Theresa Ryan Duffy, PLA, WEDG Senior Project Manager / Professional Landscape Architect GZA. Known for excellence. Built on trust. Page | 2 Project Manager and Lead Landscape Architect, Greenleaf Park, Springfield, Massachusetts. Anja led the design effort, beginning with conceptual master plan leading to full development of bid-level construction documents for the $2.5 million redevelopment project of Greenleaf Park. Anja led a team of GZA civil and geotechnical engineers and wetland scientists for the design and permitting of a significant culverted stream headwall replacement project. She led and performed designer phase construction phase serves. Project site improvements include new accessible trails and walkways, pedestrian bridge, two playgrounds, water spray play areas, parking lot improvements, stormwater improvements, lighting, landscaping, site furnishings, and signage. Project Manager and Landscape Architect | Bike and Skate Park at Gurdon Bill Park | Springfield, Massachusetts. Led design and performed project management for the design and development of a $1.5 million publicly funded park improvement project including a 12,000 square foot concrete all-wheels skatepark, playground, splash pad, picnic area, parking lot, nature-based stormwater management system, and extensive accessible multi-use pathway system. The park was completed ahead of schedule in July 2025. Consultant Reviewer/Senior Landscape Architect, Pomerance and Tuchman Master Plan, Greenwich, Connecticut. Responsible for consultant review and contribution of the development of a master plan for a 100-acre Town owned open space. The project included existing conditions assessment of historic ruins, ecological conditions, hiking trails and visitor amenities. The project produced a master plan with recommendations for future capital improvements and ongoing maintenance for this unique and historic park, including trail improvements, accessibility upgrades, and historic preservation, as well as measures to increase climate resilience and biodiversity. Consultant Reviewer/Senior Landscape Architect, Borgatti Park Pickleball Courts, Agawam, Massachusetts. Ms. Duffy performed senior-level designer services and technical review for the development of new pickleball courts within a municipal park setting. Her work included review of court layout, pedestrian circulation, accessibility, grading coordination, site furnishings, surfacing, and related park improvements to support a durable, functional, and welcoming recreational facility. She provided landscape architectural guidance to help integrate the courts into the broader park context while supporting municipal goals for active recreation, public access, and long-term maintainability. Project Landscape Architect, Springfield Senior Center at Blunt Park, Springfield, Massachusetts 2013-2016. Ms. Duffy provided landscape architectural services for the new Springfield Senior Center, a 28,000-square-foot, two-story municipal facility located on an undeveloped wooded parcel within Blunt Park. Working as part of GZA’s site civil and landscape architectural team, she contributed to the site development design for the new public facility, including landscape coordination for access drives, parking, pedestrian plazas, stormwater management areas, and related site improvements. Ms. Duffy provided planting design for the project, helping establish a durable, attractive, and context-sensitive landscape that supported the Senior Center’s civic presence, complemented the surrounding park setting, and contributed to a welcoming environment for older adults, visitors, and staff. Project Landscape Architect, Clifford A. Phaneuf Environmental Center, Springfield, Massachusetts. Anja was the lead landscape architect for the redevelopment of an environmental center located within Forest Park, a 700+ acre public park in Springfield. The LEED-accredited project included low-impact design stormwater design including a series of raingardens, specification of reclaimed and local materials, and an all-native planting design. As project manager, Anja led a team of civil engineers, environmental scientists, and geotechnical engineers. The site design fully complied with the Americans with Disability Act guidelines, including an ADA-accessible kayak launch and fishing platform on Porter Lake. The project was completed in Spring of 2016, and now is enjoyed as a year-round environmental education center for the City’s public schools. Project Landscape Architect, New Elias Brookings School, Springfield, Massachusetts. Anja was the lead landscape architect for the site design of a new elementary school. Anja worked closely with GZA civil engineers, project architects, and the client throughout the design process. Anja was responsible for laying out the site, including an 80-car parking lot, playing field, accessible playground, assembly plaza, accessible walkways, vegetable garden, and resilient/drought tolerant landscaping.
Page 385
GZA. Known for excellence. Built on trust. Years at GZA 17 (2008 – present) Years with Other Firms 7 Education B.S., 2000, Civil Engineering, University of Massachusetts-Amherst Licenses & Registrations 2006, Professional Engineer, Massachusetts, #46916 2010, Professional Engineer, Connecticut, #27641 Areas of Specialization Land Development / Site Design Hydrologic / Hydraulic Modeling Water Resources Engineering Freshwater Dredging Stormwater Management Sanitary Sewer System Design Peer Review Services Construction Observation Planimetric & Bathymetric Survey Page | 1 Steven T. D’Ambrosio, P.E. Project Manager Summary of Experience Mr. D’Ambrosio is a senior site civil professional engineer with over 25 years of experience. His responsibilities include overseeing the technical and financial operation of various projects for which he is assigned to manage, as well as providing technical support to projects under the supervision of others. His project record includes site design and permitting for development of both residential and commercial properties, sanitary sewer system design, hydrologic and hydraulic modeling, stormwater system design, utility coordination, roadway layout and design, and the design and permitting for freshwater dredging. Mr. D’Ambrosio is also a key contributor to GZA’s in-house planimetric and topographic survey efforts including site surveys, wetland delineation surveys, and lake and pond bathymetric surveys using both Total Station electronic survey equipment and Global Positioning System (GPS) equipment. Relevant Project Experience Project Engineer, Johnson Memorial Hospital Subsurface Sewage Disposal System, Stafford Springs, Connecticut. Prepared construction plans and specifications for a 50,000 gallon/day pressure-dosed subsurface sewage disposal system (SSDS) servicing a 92-bed hospital and 180-bed assisted living facility. The SSDS is comprised of two duplex pump stations, multiple actuated valve chambers, a 5,000-gallon screening tank, a 15,000-gallon septic tank, and 11,880 linear feet of leaching trench. The stepped leaching trenches span approximately 4.2-acres of an existing hillside and are installed in imported fill to maintain separation from mounded groundwater. Obtained permits for system construction from CT Department of Energy and Environmental Protection (DEEP) and participated in multiple site visits during construction as the engineer-of- record to observe contractor’s work. Construction of the SSDS was completed on September 14, 2018 and was subsequently approved for use by CT DEEP on September 21, 2018. Project Manager, Franconia Golf Course, Springfield, Massachusetts. Led a bathymetric and sediment thickness survey of the Franconia Golf Course irrigation pond (1/3 acre) located near the 13th green and 14th tee box. Collected multiple sediment samples from the pond and submitted them to a laboratory for physical and chemical analysis. Prepared permit-level drawings for an emergency dredging of the pond (<100 CY) to restore irrigation capabilities. Prepared a second set of permit-level drawings for a larger dredging effort (1,400 CY) to restore full irrigation pond capacity. Dredging was completed in the summer of 2023. Project Manager, North Riverfront Park, Springfield, Massachusetts. Prepared construction plans and specifications for the decommissioning and replacement of a failing septic system at the City-owned North Riverfront Park along the banks of the Connecticut River. Design included installation of a new low-pressure sanitary pump station, flushing manhole, and two separate low-pressure service lines connected to an existing gravity sewer manhole. Project Engineer, Camp STAR Angelina, Springfield, Massachusetts. Provided engineering design for a sanitary sewer duplex grinder pump station as part of the rehabilitation and expansion of the former “Camp SECO” in Springfield’s Forest Park.
Page 386
Steven T. D’Ambrosio, P.E. Project Manager GZA. Known for excellence. Built on trust. Page | 2 Project Engineer, 990 Housatonic Avenue, Bridgeport, Connecticut. Provided site design and permitting services for a 19,5000 SF Vehicle Maintenance Facility for the City of Bridgeport. Worked alongside a team of surveyors, MEPs, structural engineers, and building architects to provide the City with a comprehensive set of Contract Plans and Specifications. Project tasks included layout of building and facility parking, design of vehicular flow through the site, site grading, stormwater management, utility coordination, sediment and erosion control, and landscape architecture. Project Manager, Irrigation and Stormwater Runoff Treatment, Granby, Connecticut. Mr. D’Ambrosio provided stormwater management services for a 38-acre section of a 675-acre plant nursery owned by the Monrovia Nursery Company. GZA’s design included a 3,400 CF sediment forebay, and 65,250 CF at-grade stormwater infiltration basin to capture and treat irrigation and stormwater runoff from the area of concern. Additionally, GZA was retained to provide designer services during construction, and to review as-built drawings for conformance with the approved design. GZA was successful in obtaining permits from the East Granby Planning & Zoning Commission, and the project was constructed in April 2020. Project Manager, 118-122 Elm Street, Enfield, Connecticut. Provided site design and permitting services for a 7,750 SF retail building on a 0.89-acre parcel. Project tasks included layout of building and facility parking, site grading, stormwater management, utility coordination, sediment and erosion control, and landscape architecture. The project included a high-level stormwater overflow connection to a CT Department of Transportation (DOT)-owned stormdrain. Permits were successfully obtained from the local Planning & Zoning Commission and CTDOT, and the project was constructed in December 2014. Project Manager, Middle Street Drainage System Improvements, Natick, Massachusetts. GZA was hired by the Town of Natick to perform a hydraulic and hydrologic analysis of an existing stormwater management system servicing a 58-acre area of Town. The subject neighborhood is prone to periodic flooding in select low-lying areas. GZA determined that the existing stormwater management system is undersized, and subsequently provided recommendations for improvement, including the installation of 50 new drainage structures and approximately 4,000 LF of new drainpipe. The Natick Department of Public Works is actively seeking funding to install GZA’s recommended improvements. Project Manager, Solar Photovoltaic Facility, Agawam, Massachusetts. Mr. D’Ambrosio provided engineering site design services in support of a 1.8 MW solar photovoltaic facility on a 13-acre industrial zoned wooded parcel. The project included site grading, landscaping, and over 3,300 LF of access roadway. The design also included siting a new maintenance building, complete with utilities, for support services to the installation. GZA’s design received approval from both the local Planning Board and Conservation Commission and is scheduled for construction in the Summer of 2012. Project Manager, Williamsburg Estates, Southwick, Massachusetts. Peer review of a 40-lot residential subdivision on a 155-acre parcel. The subdivision was reviewed for compliance with Town Zoning and Subdivision regulations for the Southwick Planning Board, and for compliance with the Wetlands Protection Act and Stormwater Management Policy for the Southwick Conservation Commission. GZA was tasked with determining if the proposed stormwater management system was adequate, and if the subdivision road was designed to the Town’s standards and to the standards of general engineering practice for similar activities. GZA’s peer review resulted in multiple adjustments/betterments to the project design. Project Manager, Mead Park Pond, New Canaan, Connecticut. Provided design and permitting services for the conventional dredging of a 5-acre small town park pond. The project proposed the removal of approximately 37,000 CY of material. Mr. D’Ambrosio was involved in all aspects of the design and permitting process, from conducting the in-pond bathymetric survey, collecting sediment and water samples for analysis, authoring portions of environmental permit applications, to providing construction level plans and specifications. Project Engineer, Freshwater Pond Restoration, Enfield, Connecticut. Performed construction observation services for the Town of Enfield during the dredging and restoration of the Town owned, 5.5-acre, Freshwater Pond. Project included dredging 19,000 CY from the pond, construction of an in-pond sediment forebay, reconstruction of the pond outlet, construction of a public boardwalk, and associated landscaping.
Page 387
GZA. Known for excellence. Built on trust. Education B.S., 2011, Civil Engineering, University of Massachusetts Amherst Licenses & Registrations 2019, Professional Engineer, Massachusetts, #55402 Soil Evaluator, #13884, Commonwealth of Massachusetts - MassDEP Areas of Specialization Civil Engineering Land Development/Site Design Site Layout Grading and Drainage Page | 1 Mark Stadnicki, P.E. Project Manager Summary of Experience Mr. Stadnicki has experience in various aspects of civil engineering site development including layout, grading, utility, drainage design as well as construction support. In addition, he has experience in the permitting process which accompanies site civil development projects, having prepared permit applications as required by State and Local agencies. Mr. Stadnicki also has experience presenting projects before Local permitting agencies and the local public. Mr. Stadnicki has worked on numerous site civil developments performing such tasks as review of local by-laws, evaluation, planning, layout, grading, utility, drainage design, preparing engineers opinion of costs, construction specification writing, contractor submittal review, and construction observation. Mr. Stadnicki’s civil site development experience ranges from evaluations to final design, permitting and construction. Before joining GZA, Mr. Stadnicki was with SVE Associates. Project Experience Project Manager, Massachusetts Maritime Academy, Tower Lane Parking and Facilities Garage, Buzzards Bay, Massachusetts. Provided engineering design and permitting services for a 2,300 SF 4-bay garage and 5,000 SF of paved parking area on a 0.46 Ac parcel on the Buzzard’s Bay Massachusetts Maritime Academy. Prepare construction plans and specifications for the bidding of the project, as well as provide engineering services during construction. Project Engineer, North Nashua River Bank Stabilization Project, Leominster, Massachusetts. Provided engineering design services for the stabilization of approximately 500 L.F. of the North Nashua River bank to protect a 36-in sewer collection pipe that flows to the City’s water treatment plan. Project Manager, Ashfield Road Improvements Projects, Hawley, Massachusetts. Provided civil engineering services for the improvements of 1.2 miles of Ashfield Road, including the design of a culvert replacement. Prepare construction plans and specifications and assist the Town in the bidding, and construction process of both the roadway improvements and the culvert replacement. Project Engineer, Kings Corner Culvert Replacement, Hawley, Massachusetts. Provided site engineering services for the replacement of an existing culvert under West Hawley Road (Route 8A) in Hawley, MA. Assist the Town in obtaining grant funding by preparing Massachusetts Department of Transportation Chapter 85 Conceptual Bridge Design for approval. Project Engineer, Woods Hole Ferry Terminal Improvements, Woods Hole, Massachusetts. Worked as part of a team to provide engineering design, construction plans, and specifications for the next phase of the Terminal Improvements as well as provide engineering services during the Phase 6 construction. Project Engineer, India Point Park Resiliency Project – Phase 2, Providence Rhode Island. Work as part of a team to provide designer services for phase 2 of the India Point
Page 388
Mark Stadnicki, P.E. Assistant Project Manager GZA. Known for excellence. Built on trust. Page | 2 Park Resiliency Project. Provide grading design for the stabilization of the shoreline along the south eastern corner of the park and a walkway on top of a berm to provide flood resiliency to the grass field. Project Engineer, Bowen’s Pond Dam Removal and Osgood Brook Restoration Project, Wendell, Massachusetts. Provided assistance with cost estimation, quantities, and specifications for a dam removal project. Project Engineer, Church Manufacturing Co. Dam Removal and Chicopee Brook Restoration Project, Monson, Massachusetts. Provided assistance with cost estimation, quantities, and specifications for a dam removal project. Provide Resident Engineering services Project Engineer, Dredging Projects, Various Locations. Performed field investigation services, including sediment sampling related to multiple proposed dredging projects within Massachusetts. Project Engineer, Phase I Dam Inspection for Lower Van Horn Reservoir Dam, Springfield, Massachusetts. Conducted Phase I inspection and developed report. Project Engineer, Silver Lake Containment Basins, Berlin, Connecticut. Worked on closeout documents to remove materials from prior containment basins from a large multi-phase dredging project. Project Engineer, New Haven Country Club, Hamden, Connecticut. Developed a stormwater improvement plan to address overtopping at a water hazard adjacent to a green through the proposed installation of a culvert to provide more efficient drainage. Project Engineer, Godfrey Brook Improvements Projects, Milford, Massachusetts. Prepared construction plans, specifications, and opinion of probable construction cost for the improvements of approximately 450 L.F. of Godfrey Brook as part of a multi- phase flood improvement project in Milford. Project Engineer, Carriage Grove Phase 1A & 1B, Belchertown, Massachusetts. Provided site engineering services for a 108 unit housing development (Phase 1A) and supporting renovations to a historic building (Phase 2B). Project tasks include layout, site grading, stormwater management, sediment and erosion control. Project Experience Prior to GZA SVE Associates, Project Manager, NUPRO, LLC., Deerfield, Massachusetts. Provided civil site design and permitting services for a 10,000+ SF Manufacturing building in the Town of Deerfield. Project tasks included the layout, stormwater management and permitting of the project through the Select Board and Conservation Commission. SVE Associates, Project Engineer, Treehouse Deerfield, One Community Place, Deerfield, Massachusetts. Provided site, stormwater design and permitting services for multiple phases of the redevelopment of One Community Place in Deerfield. Tasks included the layout, site grading, and stormwater management for the site improvements for Treehouse’s Phase 2 redevelopment of the property. Also provide design and permitting for a pedestrian trail and pedestrian stream crossing. SVE Associates, Staff Engineer, Condominiums at Sugarloaf, Deerfield, Massachusetts. Provided civil site design and construction support of a 35 Lot senior housing subdivision on 22 Ac of land at the base of Sugarloaf Mountain in Deerfield, Massachusetts. Site design included +/-3,100 LF of roadway, with associated sanitary, sewer, water and stormwater management, soil exploration to estimate the seasonal high groundwater for the MassDEP Stormwater Management Standards, provided construction layout. SVE Associates, Project Engineer, Greenfield Municipal Parking Garage, Greenfield, Massachusetts. Provided civil design for the relocation of existing utilities around the proposed site of the municipal parking garage. Provided site layout, grading, stormwater design, and construction specifications for the project. SVE Associates, Engineer, NEXAMP, Various Sites, Massachusetts. Provided an array of services that ranged from civil site design, permitting, and construction support/layout at various NEXAMP project sites throughout Massachusetts.
Page 389
GZA. Known for excellence. Built on trust. Education MS, 2014, Environmental Studies with a concentration in Conservation Biology, Antioch University New England BS, 2004, Environmental Biology, Plymouth State University Certifications/Training Certified Wildlife Biologist® (CWB®) Professional Wetland Scientist (PWS) Professional Soil Scientist (PSS), Soil Scientist Certification – UMass, Amherst Certified Erosion, Sediment, and Storm Water Inspector (CESSWI) Levels 1 & 2 Venomous Snake Handling Course – The Rattlesnake Conservancy Combined Field Survey Techniques Training – Bat Survey Solutions Affiliations Society of Wetland Scientists (SWS) Association of Massachusetts Wetland Scientists (AMWS) The Wildlife Society (TWS) Massachusetts Association of Conservation Commissions (MACC) Soil and Water Conservation Society – Southern New England Chapter Areas of Specialization Botanical Identification and Survey Wildlife Habitat Assessment Rare Species Assessment, Survey, and Permitting Wetland Delineation and Permitting Natural Resources Inventory Vernal Pool Identification and Evaluation Construction Monitoring Page | 1 Robin Casioppo, CWB®, PWS, PSS, CESSWI Senior Ecologist / Technical Specialist Summary of Experience Ms. Casioppo is a field biologist who specializes in botany, wildlife, wetland ecology, and soil science. She is responsible for conducting botanical surveys, rare species surveys and monitoring (plant and wildlife), wetland delineations, vernal pool assessments, and natural resources inventories. Ms. Casioppo works as a Project Manager who manages many of GZA’s natural resource projects directly or works as a Lead Biologist on a larger team of scientists on larger or multi-phase projects. She has conducted numerous rare species surveys (both wildlife and plant) with special emphasis on plants, herpetiles, and bat species typically found in New England. Ms. Casioppo is experienced in U.S. Fish and Wildlife Service (USFWS) Endangered Species Act (ESA) Section 7 consultation and has conducted numerous Phase I habitat assessments and associated permitting for federally and locally rare bat species in Connecticut and Massachusetts and has experience conducting capture (mist netting) and acoustic surveys. Her herpetile experience includes survey, radio telemetry, PIT-tagging, construction monitoring, and handling of various species of turtle, salamander, and venomous/nonvenomous snake. Ms. Casioppo is experienced in ornithological field studies, including mist-netting, handling, and banding. Her ornithological experience spans from songbird northern forested habitat to shorebird coastal habitat throughout New England. She is experienced in botanical field surveys consisting of rare species, vegetation observation plots, and species richness and abundance. Her knowledge of plant species is focused on those found in New England habitats, including forest, shrub, meadow, inland wetland, and coastal salt marsh communities. She has experience preparing and implementing conservation permits under the Massachusetts Endangered Species Act (MESA) along with habitat management plans for affected rare species. Ms. Casioppo has performed numerous wetland delineations throughout New England and has supported permitting efforts consisting of federal (USACE Section 404), State (MA and CT 401 WQC, MA WPA, CT IWWA, RI FWA), and local permits. Ms. Casioppo has also performed numerous wetland delineation and permitting peer review services for local Massachusetts Conservation Commissions. Relevant Project Experience Biologist, Stream Habitat Assessments, Various Towns in Massachusetts. Lead Biologist responsible for conducting stream habitat assessments, including pebble count analysis, wetland delineation, and wildlife habitat evaluations for bridge/culvert replacement projects. Bradley International Airport Biological Assessments, Hartford, Connecticut. Ecologist, conducted rare sandplain plant surveys and mapping, as well as rare moth and beetle surveys and habitat mapping. The surveys were in support of the Airport’s Rare Species Master Plan. (2020-2021) Mansfield Municipal Airport, Mansfield and Norton, Massachusetts. Ecologist, responsible for permitting, field surveys, construction observation and reporting for this multi-year 50-acre VMP clearing project in Mansfield and Norton, MA. Multiple years of monitoring of vernal pool habitat post- invasive cutting was conducted and reported to the Conservation Commission. Other work involved updates to the VMP, development
Page 390
Robin Casioppo Senior Ecologist / Technical Specialist GZA. Known for excellence. Built on trust. Page | 2 of site-specific implementation and invasive species control plans, compliance monitoring during cutting and reporting to the Conservation Commissions in the two towns where this project occurred. Wildlife Biologist, Eastern Box Turtle Monitoring and Contractor Education Training, Utility Transmission Lines in Western Massachusetts. Lead biologist responsible for contractor education training, monitoring, and handling of turtles. Responsibilities also included the preparation and implementation of a MESA CMP. Wildlife Biologist, Eastern Rat Snake Monitoring and Contractor Education Training, Utility Transmission Lines in Western Massachusetts. Ms. Casioppo was responsible for contractor education training, monitoring, and handling of snakes. Capture and handling procedures also included PIT tagging. Responsibilities also included the preparation and implementation of a MESA CMP. Wildlife Biologist, Solar Array Installation, Plympton, Massachusetts. Ms. Casioppo’s responsibilities included the preparation of a MESA Conservation and Management Permit (CMP) with Reptile Protection Plan preparation and implementation. In-field work included eastern box turtle surveys and sweeps ahead of construction. Wildlife Biologist, Solar Array Installation, Westbrook, Massachusetts. Ms. Casioppo’s responsibilities included the preparation of a MESA Conservation and Management Permit (CMP) with Reptile Protection Plan preparation and implementation. In-field work included eastern box turtle surveys and sweeps ahead of construction, as well as turtle habitat assessments and wetland delineations. Ecologist, Rare Species Botanical Survey, Avon, Connecticut. Ms. Casioppo conducted surveys for Purple Giant Hyssop, Davis’ Sedge, Dillenious’ Tick Trefoil, Virginia Waterleaf, Three-leaved False Solomon’s-seal, and Starry Campion. Ecologist, Rare Species Botanical Survey, Woodbridge, Connecticut. Ms. Casioppo conducted surveys for Hairy angelica, Puttyroot, Dragon’s-mouth, Boreal bog sedge, Reznicek’s sedge, Hairy lip-fern, Yellow lady’s-slipper, Whitlow-grass, Tall cinquefoil, Virginia snakeroot, Fir clubmoss, Water pennywort, Creeping bush-clover, Green adder’s-mouth, Long-awn hairgrass, Eastern prickly pear, Warty panic grass, Hoary plantain, Vasey’s pondweed, Sand blackberry, Northern arrowhead, Rough dropseed, Northern dropseed, Nodding pogonia, Narrow-leaved vervain, and possum haw. Wildlife Biologist, Vernal Pool Surveys, University of Connecticut, Storrs, Connecticut. Ms. Casioppo’s responsibilities included vernal pool identification assessments and surveys in support of construction of a new road. Wildlife Biologist, Rare Species Monitoring, Milford, Connecticut. Ms. Casioppo was responsible for monitoring Peregrine falcon nesting behavior pre-construction to compare with nesting behavior during construction. Botanical Survey and Critical Habitat Assessment, Groton, Connecticut. Survey included Solidago sempervirens. Botanical Survey, Charlestown, Rhode Island. Survey included salt marsh species. Rare Species Botanical Survey, Agawam and West Springfield, Massachusetts. Survey included smooth rockcress. Rare Species Botanical Survey, Monroe, Connecticut. Survey included Meadow horsetail. ANRAD and Wetland Delineation Peer Review, Warren, Massachusetts. Project Manager in charge of in-field wetland delineation and ANRAD review. Wetland Delineation Peer Review, Blandford, Massachusetts. Consultant Reviewer in charge of in-field wetland delineation review. ANRAD Wetland Delineation Peer Review, Easthampton, Massachusetts. In-field wetland delineation review and ANRAD review. ANRAD Wetland Delineation Peer Review, Ludlow, Massachusetts. In-field wetland delineation review and ANRAD review.
Page 391
GZA. Known for excellence. Built on trust. Education M.S. Environmental Science, University of New Haven B.A. Geography/Urban & Regional Planning, Central Connecticut State University (cum Laude) Licenses & Registrations Certified Planner, American Institute of Certified Planners Certified Environmental Professional, National Association of Environmental Professionals Professional Wetland Scientist, Society of Wetland Scientists OSHA 10-HR Safety Training Fundamentals of Professional Practice (FOPPP) Certificate (2021) Areas of Specialization Coastal Resiliency Planning Environmental Impact Evaluation Federal/State/Local Permitting Wetland Assessment Ecological Restoration Lake and Pond Management Land Use Planning Dredging & Dredge Material Management Page | 1 Stephen L. Lecco, A.I.C.P., C.E.P., P.W.S. Associate Principal/Senior Environmental Planner Summary of Experience Mr. Lecco is a Senior Environmental Planner with 38 years of experience in planning, permitting and environmental analysis and design for waterfront, airport, highway, utility, dam, site development, recreation, ecological restoration, energy facility and site remediation projects throughout the U.S. but primarily in the Northeast. His role in these projects has been in project management, agency coordination, public participation, report writing, technical analysis, ecological design and mapping. His broad knowledge of many technical elements allows him to successfully manage large- scale interdisciplinary and complex projects that are required to comply with National Environmental Protection Act (NEPA), Section 404/401 Clean Water Act, Coastal Zone Management, National Historic Preservation Act, Endangered Species Act, Magnuson- Stevens Act and other federal, state and local laws, regulations and policies. Relevant Project Experience Project Manager, U.S. Coast Guard Academy and Station Waterfront Improvements, New London, Connecticut. Managed preparation of State and Federal environmental permit applications for demolition and construction of Jacob’s Rock Causeway, Main Pie, shoreline road and revetment structures, floating docks and wave attenuators as part of Design-Build team. Prepared Essential Fish Habitat Analysis and coordinated with National Marine Fisheries Services (NMFS), CT DEEP, U.S. Army Corps of Engineers (USACE) and other agencies. Project Planner, Hepburn Preserve Living Shoreline Project, Old Saybrook, Connecticut. Prepared federal, city and State permit applications for proposed living shoreline design to protect dune and marsh system adjacent to former estate of Katherine Hepburn. Coordinated with DEEP, USACE and NMFS regarding alternative designs. Assisted in conducting vegetation surveys and design of marsh and relocated creek systems. Project Manager, Long Wharf Living Shoreline Project, New Haven, Connecticut. Responsible for agency coordination and preparation of state and federal environmental permit applications for 3,500 linear feet of proposed living shoreline design solution to erosion and flooding in the Long Wharf section of New Haven. Environmental Scientist, Shoreline Erosion Repair, New London, Connecticut. Prepared permit applications for repair of severely eroded shoreline that affected an existing sewage pump station. Local Planning and Zoning approval was attained and coordination with DEEP Office of Long Island Sound was carried out to avoid impacts below the Coastal Jurisdiction Line (CJL). Project Scientist, South Branch Park River Maintenance, Hartford/West Hartford/Newington, Connecticut. For the CT DEEP, developed sampling and testing plan for sedimentation areas along 7 miles of river including Park River, Trout Brook and tributaries. Delineated wetlands in and near proposed work areas. Principal in Charge, Old Saybrook Hazard Mitigation Plan, Old Saybrook, Connecticut. Principal for preparation of a Hazard Mitigation Plan update that identifies
Page 392
Stephen L. Lecco, A.I.C.P., C.E.P., P.W.S. Senior Environmental Planner GZA. Known for excellence. Built on trust. Page | 2 vulnerable Town assets within the community and develops recommendations for avoiding and/or mitigating future losses due to a variety of natural hazards, most notably erosion and flooding due to climate change. Principal in Charge, Town of Branford, Natural Resource Inventory, Branford, Connecticut. Converted the Towns Natural Resource Inventory to an interactive online application through ESRI Web Experience Builder. The web experience relies heavily on mapping to tell the story while having a short summary text with links to organizations that provide more in-depth information on the topic. Principal in Charge, Resilient Bridgeport, Bridgeport, Connecticut. Project Manager for large-scale flood mitigation project along shoreline designed to project existing infrastructure including local neighborhoods, industrial land uses and a public university. Provided third party review of NEPA/CEPA document and assisted in the development of a Risk Registry designed to identify project risks (e.g. cost, schedule) for the project from planning through construction. Principal in Charge, Pomerance and Tuchman Properties Master Plan, Greenwich, Connecticut. Principal in Charge of this project involving assessment of resources, public surveys/outreach, and development of site improvement recommendations for 100 acres of town-owned open space. Project included historic ruins, hiking trails, visitor amenities and diverse habitats within a heavily wooded area. Project Manager, Seaside State Park Master Plan and EIE, Waterford, Connecticut. Managed CEPA document for proposed redevelopment of new State park. Evaluated several alternatives including reuse of existing National Register structures for lodging with a public/private partnership. Key issues included historic resources, traffic, economic feasibility, coastal erosion and flooding and state-protected species. Significant public input was provided during the CEPA process. Ecological Risk Assessment, Project Scientist, Ecological Risk Assessment, Plainville, Connecticut. Prepared a Screening Level Ecological Risk Assessment at a plating facility with historic discharges of metals and PAHs to wetlands and waterbodies in the Pequabuck River watershed. Project Scientist, Ecological Risk Assessment, Naugatuck, Connecticut. Prepared Screening Level Ecological Risk Assessment at a chromium plating facility with discharges to Fulling Mill Brook. Performed a 7Q10 analysis to estimate contaminant concentrations in receiving waterbody. Principal in Charge, Glastonbury Open Space and Woodland Management Plan, Glastonbury, Connecticut. Natural resources and trail inventory/assessment at J.B. Williams Park and the former MDC Parcels encompassing over 600 acres of Town-owned recreational assets. Developed public survey and presented results to Town Council and project stakeholders. Developed recommendations for long-term improvements based on survey results and Town resources. Principal in Charge, Lower Great Riverfront Park, East Hartford, Connecticut. Project involves creating a more resilient trail system along approximately 2,000 feet of multi-use trail system along the Connecticut and Hockanum Rivers. Key challenges include floodplain impacts, impacts to mature trees, shoreline erosion and floodwater sedimentation. GZA is working with the Town of East Hartford and Riverfront Recapture. Project Manager, CT DEEP Trails Study, Connecticut. Managed the assessment of trail conditions along 150 miles of trail within Shenipsit, Nipmuck, Cockaponsett and Pachaug State Forests. Developed a geodatabase for use by the CT Trails Manager for use in future permitting of Off-Highway Vehicle events. Also prepared an analysis of potential new ATV sites within DEP property.
Page 393
GZA. Known for excellence. Built on trust. Education B.A., 2003, Anthropology, Sonoma State University M.L.A., 2024, Landscape Architecture, University of Massachusetts – Amherst Certifications WEDG Cultural Landscape Management Certified Playground Safety Inspector Awards Olmsted Scholar 2024, Landscape Architecture Foundation Affiliations/Membership American Society of Landscape Architecture Boston Society of Landscape Architects Areas of Specialization Landscape Architecture Site Design Layout Grading and Plantings Graphic Design Conceptual Rendering Page | 1 Jeffrey Taylor, WEDG, CPSI Landscape Designer Summary of Experience Jeffrey Taylor is a landscape designer based in Springfield, Massachusetts. He specializes and has experience in producing construction details and documents, grading and planting plans, hand-drawn and computer-generated graphics, site inventory analysis, master plan documents, and 3D renderings. He has designed private residential schematics, worked on university campus design, planting and restoration projects, and has collaborated in producing innovative design solutions for civic and public spaces such as streetscapes, parks and children’s playgrounds and spaces. Jeffrey has cultivated strong interpersonal and communication skills, having community outreach and engagement experience working with a wide diversity of people from different cultural groups and backgrounds Coupled with his understanding and commitment to providing nature-based solutions, green infrastructure and environmental justice, he is dedicated to providing these priorities as a part of resilient, creative and impactful design solutions. Project Experience Landscape Designer, India Point Park Resiliency Review and Feasibility Study, Providence, Rhode Island. GZA performed an in-depth site assessment and development guide which was solicited by The Nature Conservancy on behalf of the City of Providence Parks Department. This included a comprehensive risk assessment concerning future impacts of climate change, storm surge, and sea level rise at the park, with multiple nature-based design interventions that were subsequently recommended to protect existing features and enhance the shoreline for ecological habitat and recreational opportunities. Jeff worked closely with coastal engineers, ecologists, and landscape architects to develop conceptual designs that prioritized living shorelines to support intertidal habitat through the integration of natural and nature-based protective measures, and to conceive of features that would cultivate a safe and accessible public waterfront experience at the park for future decades. Consultant and Landscape Designer, Salmon Brook Park and Ahrens Park, Granby, Connecticut. Jeffrey worked closely with GZA Project Manager Dan Shaw and staff within the Town of Granby to inventory, assess and make recommendations towards the park infrastructure and future planning improvements. His knowledge and experience with park operations, logistics and maintenance as a former Park Ranger (see prior experience below) made him a valuable resource in providing input and design ideas, as well as the orchestration and support of public meetings to gather feedback and share information with the community. Services also included creating master plan proposals for both park facilities. Landscape Designer, Bay Path Cemetery, Springfield, Massachusetts. Jeffrey is part of the design and development team with GZA Senior Project Manager Anja Duffy for this historic cemetery. He contributed design concepts, renderings and full construction plans and drawings, as well as proposed interpretive signage that provides an overview regarding the site’s historic significance. The project is currently under construction. Landscape Designer, Greenleaf Tennis/Pickleball Courts, Springfield, Massachusetts. Jeffrey assisted with the design and development with GZA Senior
Page 394
Jeffrey Taylor, WEDG, CPSI Landscape Designer GZA. Known for excellence. Built on trust. Page | 2 Project Manager Anja Duffy for new court facilities at this park and was responsible for creating construction documents. The project is currently under construction. Landscape Designer, G. Frank Adams Park, Springfield, Massachusetts. Jeffrey is part of the design and development team with GZA Senior Project Manager Anja Duffy for this neighborhood park. He created conceptual designs and analyses prior to developing construction plans and details for park improvements that included new walking paths, parking lot, and updated playground facilities. Regarding the latter, Jeffrey has studied the importance and safety aspects concerning children’s play and is a Certified Playground Safety Inspector through the NRPA. The project is currently under construction. Experience Prior to GZA PARK OPERATIONS AND MANAGEMENT Park Ranger II, Sonoma County Regional Parks, Santa Rosa, California. Jeffrey has more than fourteen years of experience in managing park facilities including service to the public, maintenance and operational procedures, regulation and code enforcement, accounting, reporting and documenting incidents, emergency medical care, supervision of staff and dealing with the needs of park visitors. He has handled multiple challenging and confrontational situations involving criminal suspects while enforcing county and state penal codes; communicated and acted effectively to ensure personal and public safety. Jeffrey has coordinated with supervising rangers in the recruitment, screening, interviewing, and hiring of seasonal staff members, as well as experience with counseling and training staff members on job functions and assignments regarding visitor services, maintenance tasks, law enforcement options, and emergency procedures. He also conducted, developed, and led guided walking tours, cooking programs, backpacking clinics, and other park interpretation events. Acted as lead interpretative ranger for the Central Operations and South Divisions regarding issues of public speaking, subject research and investigation, and involvement in volunteer events. He has worked as a liaison with tribal citizens of the Federated Indians of Graton Rancheria regarding Tolay Lake cultural history, resource protection and interpretation, personal tours and assistance with special events involving the tribe. He has collaborated with park planners regarding department facilities, improvements to park properties and programs, operational requirements for new acquisitions, and contributions for the development and management of events. Jeffrey has experience with the news media and marketing in conducting live and recorded radio interviews and programs for broadcasting park events and promoting the department. He developed, wrote, and recorded a weekly solo radio program to foster community engagement and stewardship awareness issues surrounding parklands and environmental awareness. He has actively worked to improve public safety within park facilities and the community at large; worked as a certified Emergency Medical Technician (EMT-B) from 2005 to 2019; achieved the role as a Certified Playground Safety Inspector (CPSI) through the National Recreation and Park Association (NRPA); held certification as a Level 9 Safety Instructor for BLS and Wilderness Emergency Care by the American Safety & Health Institute (ASHI).
Page 395
Veteran’s Memorial Park - Middletown, CT Renovation and addition to existing pool house, including utility infrastructure for new splash pad Howard T. Brown Memorial Park Waterfront Revitalization - Norwich, CT Park revitalization including a splash pad/seasonal ice rink, support structures, ADA-compliant restrooms, event stage, and associated site improvements Hamilton Park Master Plan - Waterbury, CT Architectural and structural building condition, code compliance and accessibility review for three structures at Hamilton Park in Waterbury. Washington & Fulton Park Bathhouses - Waterbury, CT Renovations to existing bathhouses Hamilton Bathhouse - Waterbury, CT Design services for a new bathhouse and pool for Hamilton Park in Waterbury, CT Walker Grandstand Study - Springfield, MA Renovation of the Walker Memorial Grandstand in Springfield’s Forest Park. Senior Center Feasibility Study & Renovations - Manchester, CT Facility Needs Analysis, Programming, Site Evaluation, Renovation of Existing Senior Center City of Waterbury - Waterbury, CT Assessment of eight existing fire stations within the City; design for Fire Station #07 Municipal Campus Master Plan - Mansfield, MA Creation of a municipal services campus master plan, including the Senior Center, Community Center, and Town Hall. University of Connecticut - Storrs, CT Avery Point TIP Program Building Renovations, Accessibility Renovations, Longley Building Assessment/Renovation, Whitney Dining Hall With hands-on experience in the construction industry and refined architectural design skills, Chris is an asset to every project he manages. His effective communication skills, attention to detail, and knowledge of resource-efficient buildings result in innovative design and seamless project management. Years of Experience with edmSTUDIO: 16 EDUCATION B.Architecture - Wentworth Institute of Technology CHRIS WANTE, AIA PRINCIPAL/PROJECT MANAGER SELECT EXPERIENCE REGISTRATIONS Connecticut #14554 New York #39503 Massachusetts #953063 MEMBERSHIPS American Institute of Architects (AIA) US Green Building Council
Page 396
Brad has a natural curiosity about how buildings work and enjoys seeing how all the pieces come together. With a degree in Architectural Engineering Technology, he brings a broad understanding of building systems and the relationship between architectural, structural, and MEP design. That perspective helps him keep the bigger picture in mind while developing mechanical solutions that fit smoothly within the overall design. On projects, Brad enjoys the problem solving that comes with coordinating building systems and finding practical solutions that support the broader design goals. He values collaboration with the design team and looks for opportunities to improve efficiency and constructability throughout the project. Outside of work, Brad supports programs that promote wildlife protection and the conservation of land and natural resources. Brad Park Principal in Charge Greenville Elementary School | Norwich CT 80,000 sf | Masterplan + New Construction Town of Suffield | Suffield CT 489,538 sf | Facility Assessment Masterplan Harkness Memorial State Park | Waterford CT 11,500 sf | Assessment + Historic Reno | Park Office, Maintenance Building + Greenhouse Norwich Public Schools | Norwich CT 14 Buildings | Study + Masterplan Norwich Waterfront Park | Norwich CT New Development Simsbury Town Hall | Simsbury CT Rooftop Unit Replacements Stanton Elementary School | Norwich CT 80,000 sf | Masterplan + New Construction Waterbury Chase Building | Waterbury CT 100,000 sf | Historic Renovation | Municipal Space West Hartford Public Safety | West Hartford CT 104,000 sf | Study | 5 Fire Stations + Public Safety HQ Contact bpark@ceseng.com Experience Consulting Engineering Services 2018-present Prior: 6 years Education BS Mechanical Engineering Vermont Technical College Randolph VT
Page 397
Brittany brings energy and enthusiasm to every project she supports. As a mechanical engineer focused on plumbing and fire protection systems, she works closely with project teams to interpret codes, coordinate design, and help ensure systems are practical and well integrated within the overall building. She enjoys collaborating with colleagues and contributing to solutions that keep projects moving forward. She is also deeply involved in mentoring and outreach within the engineering community. Brittany currently serves as President of the Connecticut Chapter of ASHRAE and regularly speaks with students and young professionals about careers in the field. Standing just five feet tall, she once played center on her high school hockey team and today stays connected to the sport as a Level 4 certified USA Hockey referee. Brittany Conry PE Project Manager Bloomfield Fire Station #3 | Bloomfield CT 12,970 sf | Study + New Construction Bulkeley High School | Hartford CT 330,000 sf | Renovate as New + Addition | Includes Library Pumpkin Delight Elementary School | Milford CT 53,000 sf | Renovation Southington Library | Southington CT 29,000 sf | New Construction The Towers at Tower Lane | New Haven CT The Towers at Tower Lane | New Haven CT Trumbull Public Schools | Trumbull CT 10 Schools + 3 Buildings | Assessment + Masterplan Valley Shore YMCA | Westbrook CT 9,000 sf | Renovation Waterbury Chase Building | Waterbury CT 100,000 sf | Historic Renovation | Municipal Space Contact bconry@ceseng.com Experience Consulting Engineering Services 2020-present Education BS Mechanical Engineering University of Connecticut Storrs CT Licenses Professional Engineer Fire Protection MA Memberships American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE) 2025-2026 President New England Healthcare Engineers’ Society (NEHES) Certifications ASSE 6060 Designer
Page 398
Kathleen has always been the kind of person who takes things apart just to understand how they work. That curiosity carries into her work as a certified Passive House designer, where she focuses on thoughtful, sustainable building strategies. She enjoys digging into ideas with the team and working through challenges together to find solutions that support the whole project. Collaboration and problem solving are a big part of what motivates Kathleen day to day. She values open conversations across disciplines and the chance to explore new approaches that improve building performance. At home, that same curiosity shows up in the kitchen, where she enjoys experimenting with new recipes and learning the science behind food. Kathleen Baker PE, CPHD Senior Mechanical Engineer Brimfield Town Hall | Brimfield MA 8,000 sf | Renovation + Addition Cromwell Middle School + BoE | Cromwell CT 96,000 sf | New Construction Eno Memorial Hall | Simsbury CT Geothermal + HVAC Feasibility Study Lincoln Community Center | Lincoln MA 20,500 sf | New Construction | Net Zero Manchester Public Library | Manchester CT 75,000 sf | Study + New Construction | Targeting Net Zero North Brookfield Fire Station + DPW | North Brookfield MA 18,000 sf Study | 4,000 sf Renovation Norwich Waterfront Park | Norwich CT New Development West Hartford Public Safety | West Hartford CT 104,000 sf | Study | 5 Fire Stations + Public Safety HQ Wilton Police Department | Wilton CT 16,000 sf | Study + New Construction Contact kbaker@ceseng.com Experience Consulting Engineering Services 2023-present Prior: 8 years Education BS Mechanical Engineering Rensselaer Polytechnic Institute Troy NY Licenses Professional Engineer Mechanical CT WI Memberships American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE) Certifications Certified Passive House Designer (CPHD)
Page 399
Kevin specializes in technology systems design, with expertise in telecommunications, security, audiovisual, and other low-voltage systems that support modern building environments. He enjoys helping clients navigate complex technology needs and translating project goals into practical, coordinated solutions that are both effective and easy to implement. Drawn to projects where multiple systems must work together seamlessly, Kevin works closely with project teams to develop infrastructure that supports communication, connectivity, and security. He values collaboration and enjoys finding creative ways to integrate technology into the built environment while keeping the end user experience in mind. When he’s not working, Kevin can often be found planning his next adventure and checking another national park off his ever-growing list. Kevin King PE, CTS Technical Leader // Senior Electrical Engineer Bloomfield Fire Station #3 | Bloomfield CT 12,970 sf | Study + New Construction Colt Park | Hartford CT Site Lighting | Sport Courts Elizabeth Park | Hartford CT Site Lighting | Electrical Upgrade Elmwood Community Center | West Hartford CT 82,000 sf | New Construction Hartford Public Library, Park Branch | Hartford CT 11,500 sf | New Construction Lincoln Community Center | Lincoln MA 20,500 sf | New Construction | Net Zero Southington Library | Southington CT 29,000 sf | New Construction West Hartford Public Safety | West Hartford CT 104,000 sf | Study | 5 Fire Stations + Public Safety HQ Wilton Police Department | Wilton CT 16,000 sf | Study + New Construction Contact kking@ceseng.com Experience Consulting Engineering Services 2013-present Education BS Electrical Engineering University of Connecticut Storrs CT Licenses Professional Engineer Electrical CT FL HI MA RI Certifications Certified Technology Specialist (CTS)
Page 400
Mckenzie brings an optimistic, positive mindset to each project she supports. Known in the office as a go-to Revit and training resource, she enjoys helping teammates understand how plumbing and fire protection systems work. Her ability to break down complex code requirements and design questions into clear, practical explanations makes her a valuable part of the team. Mckenzie also has a strong eye for coordination, especially when projects involve tight or unconventional spaces where systems need to fit together carefully. She enjoys working through those puzzles with the broader design team across disciplines to find solutions that make sense for the whole project. When she is not at work, she can proudly say she once made it to the finals of an all women’s cornhole tournament. Mckenzie Trevethan Plumbing + Fire Protection Engineer Chicopee Maintenance Garage | Chicopee MA 9,000 sf | New Construction Fred D. Wish Elementary School | Hartford CT 91,365 sf | Renovate as New | Includes Recreation Space Hartford YWCA | Hartford CT 16,200 sf | Renovation Lincoln Community Center | Lincoln MA 20,500 sf | New Construction | Net Zero Mansfield Town Hall + Community Center | Mansfield CT Existing Conditions Study + Design for Renovation Norwich Waterfront Park | Norwich CT New Development Sage Park | Berlin CT Renovation | Restrooms Warwick Police Department Garage | Warwick RI 7,125 sf | New Construction Woodrow Wilson Recreational Center | Middletown CT 42,000 sf | Study + Renovation Contact marmington@ceseng.com Experience Consulting Engineering Services 2019-present Education BS Mechanical Engineering Fairfield University Fairfield CT MS Mechanical Engineering Fairfield University Fairfield CT Memberships American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE)
Page 401
MACCHI ENGINEERS, LLC Diversified Structural and Civil Engineering Services MICHAEL PLICKYS, P.E. PRINCIPAL IN CHARGE EDUCATION University of Rhode Island, BSCE, 1986 Lehigh University, MS Structural Engineering, 1988 Chi Epsilon – Civil Engineering Honor Society Tau Beta Pi – National Engineering Honor Society PROFESSIONAL REGISTRATION Connecticut 1991, Massachusetts 2014, New York 2015, Rhode Island 2015, Certified OSHA 10 PROFESSIONAL ACTIVITIES Adjunct Professor: CCSU, New Britain, CT, Capital Community College, Hartford, CT, University of Hartford, West Hartford, CT PROFESSIONAL RECORD Michael Plickys, P.E., is the Principal in Charge and is responsible for overseeing and supervising all projects. He has been with Macchi Engineers since 1989 as a design engineer of reinforced concrete, steel and timber structures for various building applications. His expertise includes feasibility studies, structural investigation and analysis, structural design for new construction, renovation and upgrades, third party threshold review, and special inspection services. He is extremely proficient in developing BIM Modeling utilizing Revit Software. Additionally, Mr. Plickys is responsible for defining scope of work, contract negotiation, client liaison and quality control procedures. LIST OF PROJECTS Birch Grove School Replacement, Tolland, CT Structural and civil design services for the complete replacement of an existing 92,000 SF school that has a crumbling foundation. The new 85,000 SF school building accommodates 509 students. Civil/site work included development of new entry areas, new par king lot, service areas, vehicular circulation, new outdoor courts and terraces, site walks, stairs, ramps and accessibility. CVH Old Power Plant Renovations, Middletown, CT Structural design services for the new roof support structures. Work includes demolition and reconstruction work. ECSU Police Station, Willimantic, CT Structural and civil design for a new two-story, approx 8,500 SF fire station. Structure consists of wood framing, masonry veneer and seam metal roof. Civil/site development included the demolition of the existing buildings, drives and parking lot and the construction of a new access drive, sidewalks, parking lot, sanitary sewer, storm drainage, domestic and fire services. Coordinated work with the Charter Oak Road Widening Project. Also upgraded campus tele/data and electrical services. Enfield Fire Station, Enfield, CT Structural and civil design for a new two -story, 16,000 SF, 3 1/2 bay, brick and steel framed structure with timber roof trusses encompassing 30 rooms plus an apparatus room. E.T. Grasso Technical High School, Groton, CT Provided the structural and civil design for a new 243,000 GSF vocational education high school building and 5,000 GSF garage. Fred D. Wish PreK to 5th Grade Elem School, Hartford, CT Structural design for a new 75,000 SF elelmentary school building. Project is delivered with the development of Building Information Modeling (BIM) using Revit Software. Hartford Public Safety Complex, Hartford, CT Project Manager for the structural and civil design services for the construction of a new Public Safety Complex. The new complex houses all the public safety divisions for the City of Hartford including fire, ambulance and police facilities. Project als o includes 140 car parking deck and miscellaneous ancillary buildings. HPL-Park Branch (Lyric Theater), Hartford, CT Provided structural and civil engineering services for the construction of a new 2 -story building at the location of the existing Lyric Theater. The addition contains a partial below grade basement and the total area of the new addition is approximately 20,000 GSF. Hartford Trinity Magnet College Academy, Hartford, CT Structural design services for the construction of a new 70,000 SF addition and renovations to existing school . Project was delivered with Building Information Modeling (BIM) using Revit Software. Martin Luther King, Jr. School, (MLK) Hartford, CT Structural design services including the structural assessment for the conversion of the existing MLK School into a new Middle School/Magnet School campus to accommodate 800 students. The project includes approx. 140,000 SF of renovations and 34,000 SF of new construction. The project a “renovate-as-new” was delivered with Building Information Modeling (BIM) using Revit Software. Marin Garfield Open Space Fire House, Bridgeport, CT Structural design for a new two -story, two -bay, steel framed structure with light gauge metal truss roof. Structure supported by a shallow spread footing foundation. Plan area approx. 13,000 SF. Mattatuck Factory Reuse Project, Waterbury, CT Development of a site remediation and reuse plan for abandoned Mattatuck Factory. Proposed plan included a four -bay fire station with an adjacent satellite police station and a senior center. Plainfield Fire Department Headquarters, 12 Railroad Ave, Plainfield, CT Civil / site engineering for the construction of a new Fire Department Headquarters at the site of a former catholic school. Work includes stormwater, sanitary and water design services. Rockville Courthouse Parking Structure, Rockville, CT Design/build project – provided the structural design services for the construction of a new 3-story parking structure for 173 cars. Sisson Avenue Fire Station #3, Hartford, CT Structural design and construction inspection for Hartford firehouse. Southington Police Facility, Southington, CT Structural and civil design of a new single -story, 30,000 SF police facility. Sleeping Giant State Park, New Visitors Center, Hamden, CT Structural and civil engineering for the construction of a new visitor center cabin. Tolland Fire Station 140, 64 Crystal Lake Road, Tolland, CT Work included site survey and structural inspections and monitoring of a crumbling foundation of an existing firehouse. UConn Hockey Arena, Storrs, CT Structural design services for a new a 2,400 seat capacity Division One Hockey Arena with a new three-story elevator. The new arena is a steel-braced framed structure supported on a shallow footing on Rammed Aggregate piers. Work completed included the D esign- Build “Bridging” Enhanced Schematic Design Documents. The Project was delivered with Building Information Modeling “BIM” using Revit Software. Waterbury Senior Center and Fire Station, Waterbury, CT Analysis and review of former manufacturing site to determine the feasibility of the development of a reuse plan to include a new fire station and senior center. WCSU Police Station, Danbury, CT Civil design for a new 8,100 SF police station with LEED Silver design and construction on the Midtown Campus. Civil/site work includes layout of parking areas and walkways, grading, landscaping, utilities and storm drainage design. The project included a pre-design study and site selection. Williamstown Firehouse Facility, 562 -574 Main Street, Williamstown, MA Structural design services for a new 27,000 SF firehouse facility. Project was delivered with the development of Building Information Modeling (BIM) using Revit Software. Windham Region Transit District, Mansfield Center, CT Structural and civil design for improvements and expansion to the existing CT DOT Windham Region Transit District Facility site, maintenance building, and cold storage building. Windham Community Memorial Hospital, Emergency Dept and Outpatient Services, and Relocation of Helipad, Windham, CT Provided structural and civil design of three separate additions to existing hospital, relocation of helipad and civil design of extensive storm drainage system. XL Center, McGinley Elevator, 1 Civic Center Plaza, Hartford, CT Structural design services for the installation of a new four -story elevator including construction administration and inspection.
Page 402
MACCHI ENGINEERS, LLC Diversified Structural and Civil Engineering Services GEORGE D. BITTEL PROJECT ENGINEER EDUCATION University of Hartford, West Hartford, CT, BSCE, 2023 President’s List – University of Hartford 2020 Dean’s List – University of Hartford University of Hartford Regents Scholarship AI Savin Scholarship AFFILIATIONS American Society of Civil Engineers Institute of Transportation Engineers PROFESSIONAL REGISTRATIONS License: E.I.T. PROFESSIONAL RECORD George Bittel’s experience as a project engineer includes working closely with supervisors, inspectors and subconsultants. Mr. Bittel’s project assignments range from design engineer to project engineer . Mr. Bittel is extremely proficient with the use of Auto Cad, Ram Structural Systems, Ram Beam Analysis software, Microsoft Office 365, Civil 3D, SYNCHRO, Highway Capacity Software (HCS), SAP2000, Matlab, PIMA Scheduling, C++, SolidWorks. LIST OF PROJECTS DEEP Necropsy Lab -Sessions Woods Wildlife Management Area, Burlington, CT Project Consists of a wood- framed 3,300 SF Necropsy Lab and support /storage spaces. Responsible for specification updates, CAD work and permitting assistance. ConnDOT, Newington, CT Office of Construction – Quality Assurance Compiled data from 500+ VE studies and post -construciton reviews. Used Bluebeam to produce writeable report templates for blank post-construction review templates. Barkhamsted Old Hartford Road Senior Development, Barkhamsted, CT Civil/site development for land development for a total of four(4)-five (5) unit buildings situated on approx. 5 acres. Work includes subconsultant coordination for geotechnical, survey and wetlands delineation. Beer Code at Bradley Airport, Windsor Locks, CT Structural engineering for roof top mechanical supports. New PEMB Foundation, Bloomfield, CT Providing structural engineering services for the design and detailing of a foundation and slab on grade systems, site equipment pads, and an internal standalone mezzanines. Overall the project involves the construction of a new single story (Cannabis) pre -engineered metal building with a plan area of approx. 40,000 SF. 608 Main Street, New Britain, CT 2015 (CHFA) Structural engineering services for the assessment of the existing Historic Berkowitz Building. The overall project consists of the residential and commercial renovation of the Berkowitz building and potential commercial and residential new construction. Currently providing the structural design services for the development of new housing “Crysalis Towne Houses”. Lapenta Boys & Girls Club, Hartford, CT Project Engineer for the expansion and renovations to the Joseph D. Lapenta Northwest Boys & Girls Club includes a new 18,000 SF addition. The project is funded by the State of Connecticut Department of Children and Families CT DCF grant. Keeney Elementary School Renovation, Manchester, CT Structural design services for a renovate- as-new project. Major renovations and additons to and existing elementary school. State Police Troop A, Southbury, CT Work includes structural and civil design services for Troop A generator replacement and service upgrade. Marder Seafood, New Bedford, MA Structural design services for new exterior addition and an interior mezzanine. Norwalk Community College Roof Study, Norwalk, CT Structural investigation and analysis of the Norwalk CC existing roof. NVCC Parking Garage and Plaza Repairs, Waterbury, CT Project Engineer for the structural engineering services for repairs for the 76,000 SF Plaza Deck, and the two- story, 196,000 SF, 550-carAcademic Core Parking Garage which is located below the Plaza and the Ekstrom Parking Garage. 79 Elm Street, Hartford, CT Structural repairs for an existing below grade vault and loading dock areas located on the south side of the original 79 Elm Street Building. Work includes in-depth visual inspection and structural analysis for mech/electrical Vault and loading dock structural repairs. St Vincent de Paul, Middletown, CT Structural engineering services for the design of a 15,000, 4- story building for spportive housing and services center for St Vincent de Paul. Waterbury Superior Courthouse Parking Garage Repairs, 400 Grand Street, Waterbury, CT Project Engineer for the investigation and structural repairs to an existing 1998 five-story precast concrete structure. Williamstown Fire House, Williamstown, MA Structural design services for the construction of a new 27,000 SF firehouse facility. UTC, PRATT & WHITNEY PROJECTS Pratt & Whitney UTRC CLCS Tank Hoist Review , East Hartford, CT Provided engineering services for hoist review. Pratt & Whitney A-Building, East Hartford, CT Provided engineering services for Column, G5- 1 Ton Hoist upgrade. Pratt & Whitney Oil House (Burner Rig) East Hartford, CT Provided engineering services for elevated platform analysis. Yarde Metals (Production Equipment, Southington, CT Structural design ser vices for a 10- ton crane system evaluation. York Correctional Institute, Animal Rescue Barn, Niantic, CT Civil/site engineering services for a prefabricated bathroom with a shower, insulated walls and ceiling, electrical, lighting, heating, ventilation, plumbing (sewer, hot and cold water) connection points. Work to include design for insulated concrete slab, ADA Accessibility for the bathroom and an existing office, sanitary tie- in, potable water connectins, underground conduit run and prefaricated specification.
Page 403
Proposal for Professional Engineering Services
Town of Granby
07 COMPANY PROPOSAL
07 COMPANY PROPOSAL
07 COMPANY PROPOSAL
ATTACHMENT
C Cost Proposal
Page 404
Page 7 of 7 APPENDIX A Cost Proposal Name of Engineering Firm: ___________________________________________________ Services Needed On-Call Engineering and Related Services Please indicate your firm’s hourly fees over the five-year period of the contract Billing Category Hourly Billing Rate Project Manager ________________ Chief Engineer ________________ Engineer ________________ Technician Support ________________ Clerical/Researcher ________________ Other ________________ Other Expenses (if applicable): Identify any other categories and costs required to provide Engineering and On-Call services that are not included above: ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ See attached for GZA's full list of rates and Subcontractor's rates. GZA GeoEnvironmental, Inc.
Page 405
2026 Fee Schedule – Granby CT On-Call Page | 1 of 1 SPR-CY26-2.37L – GRANBY CT ON-CALL Client (“You”): Town of Granby Proposal No: 15.P000095.27 Date: July 21, 2026 A. FEES FOR SERVICES Fees for services will be based on the time worked on the project by personnel plus reimbursable expenses. Labor related fees will be computed based on actual time worked on the project, including time required for travel from the GZA office to/from project site, and according to the rates listed below. Classification Hourly Rate Technician II $86 Technician I $109 Staff Engineer/Scientist II/Landscape Designer II $117 Staff Engineer/Scientist I/Landscape Designer I $126 Technical/Administrative Support $137 CAD/Technical Designer $137 Assistant Project Engineer/Scientist/Landscape Designer $152 Senior CAD/Technical Designer $165 Project Engineer/Scientist/Landscape Architect $183 Senior Wetland Scientist $215 Senior Project Engineer/Scientist/Landscape Architect $215 Senior Consultant $243 Associate Principal Engineer/Scientist $273 Principal Engineer/Scientist $273 Senior Principal Engineer/Scientist $273 1. Rates above include fringe benefits, burden, and fee. Rates are typically subject to annual increases. 2. Pre-trial conferences, depositions, mediations, and expert testimony will be billed at one and one-half (1.5) times the rates above. 3. Work requiring out-of-town overnight stays will be billed at eight (8) hours minimum per day. 4. Direct non-salary project-related expenses, including subcontractors, will be billed at cost plus fifteen (15) percent. 5. General project-related expenses such as smartphones (including mobile app fees); data and cybersecurity; in- house reproduction; mail and hard-copy document delivery; and long-term electronic and paper document storage will be billed as a general communication fee at a rate of three (3) percent of the labor charges. 6. Based on client need or request, retired GZA Principals or other individual subconsultants may be retained to perform project work. In these cases, the billing rate for these individuals will be the appropriate rate listed above. 7. Employee vehicle use will be billed at Internal Revenue Service (IRS) allowed mileage rates. 8. Project and fieldwork-related equipment use will be billed as cost + 15%. 9. For projects involving access to hosted online data hubs (ArcGIS, EQuIS, and others) or high-resolution digital imagery, additional software hosting fees may apply and will be calculated as cost + 15%. Fees for staff involved in hosted online data hubs or high-resolution digital imagery will be based on equivalent classifications listed in the above table.
Page 406
www.edmstudiocreates.com | 860 866 6092 HOURLY RATES ARCHITECTURE Principal $230.00 per hour Architect IV $210.00 per hour Architect III $190.00 per hour Architect II $170.00 per hour Architect I $150.00 per hour Designer IV $190.00 per hour Designer III $170.00 per hour Designer II $150.00 per hour Designer I $125.00 per hour INTERIOR DESIGN Interior Designer II $150.00 per hour Interior Designer I $125.00 per hour PROJECT MANAGEMENT Project Manager III $190.00 per hour Project Manager II $170.00 per hour Project Manager I $150.00 per hour GENERAL Marketing II $150.00 per hour Marketing I $125.00 per hour Support Staff $80.00 per hour REIMBURSABLES Reproductions and Shipping Cost plus 15% Consultants and Technical Support Cost plus 15% Transportation, Meals, and Lodging Cost plus 15% Auto Mileage per IRS allowance Rates effective through December 31, 2026 Invoices for services are presented monthly. Accounts over 30 days are subject to a finance change of 1.5% per month on unpaid balances.
Page 407
Diversified Structural and Civil Engineering Services
2026 SCHEDULE OF FEES
FOR
PROFESSIONAL ENGINEERING SERVICES RENDERED
HOURLY BASIS
Principal $240.00
Project Manager $195.00
Senior Engineer $175.00
Engineer $150.00
CAD Operator $115.00
Technician $115.00
Construction Inspector $145.00
MACCHI ENGINEERS, LLC
Page 408
Hourly Rates Position Hourly Rates for Services Rendered Principal in Charge $345/hr Associate/Team Leader $315/hr Project Manager $290/hr Senior Engineer $260/hr Engineer $230/hr Senior Engineering Designer $185/hr Engineering Designer $165/hr Draftsperson $145/hr Clerical/Secretarial $110/hr
Page 409
Proposal for Professional Engineering Services Google Map Data ©2026
Page 410
1
Proposal for
Professional Engineering
Services
7.24.2026
Contact
Gregory J. Levasseur, P.E.
Vice President,
Windsor Office Director
H2M Architects & Engineers, Inc.
360 Bloomfield Avenue
Suite 406
Windsor, CT 06095
860.607.9011 ext.1034
973.334.0507
glevasseur@h2m.com
Table of Contents
→ Cover Letter
→ TAB 1 ► Project Understanding & Approach
→ TAB 2 ► Firm Qualifications & Experience
► References
→ TAB 3 ► Staffing Plan & Resumes
→ TAB 4 ► Appendix A - Cost ProposalPage 411
H2M Architects, Engineers, Geology, Land Surveying and Landscape Architecture, DPC (NY) offers its services in NY only H2M Architects & Engineers, Inc. (NJ) offers its services in NJ, DE, CT, FL, LA, MA, PA, RI, SC, and VA only H2M Associates, Inc. (NJ) offers its engineering, land surveying, landscape architecture services in NJ only H2M will provide appropriately licensed staff for this project - see Staffing Plan for details. h2m.com July 22, 2026 Mike Walsh, Town Manager Town of Granby 15 North Granby Road Granby, CT 06035 RE: Proposal for Professional Engineering Services Dear Mr. Walsh: H2M Architects & Engineers, Inc. (H2M) is pleased to submit our proposal and approach to providing professional engineering services to the Town of Granby for the planning, design, and construction of a replacement athletic/running track and adjacent baseball and softball fields at the Granby High School/Middle School complex, as well as on-call engineering services in support of the Town's capital improvement and infrastructure initiatives, including new restroom, pickleball courts, and sewer pump station improvements. Building local communities since 1933, H2M has extensive experience planning and designing athletic fields and courts, park facilities, and supporting infrastructure for municipal and educational clients. Our portfolio includes numerous athletic facility projects, park improvements, utility infrastructure upgrades, drainage and site development projects, and municipal capital improvements that demonstrate our ability to deliver coordinated, cost-effective solutions while meeting regulatory, budgetary, and scheduling requirements. H2M has carefully crafted a team that is familiar with designing projects of this size and scope. I will serve as Principal-in-Charge and primary client liaison, with authority to commit firm resources to this project. One of the benefits of H2M is our ability to act as a one-stop shop providing multi-disciplinary services, including civil, mechanical, electrical, plumbing, water, and wastewater engineering and architecture. To support the various capital improvements the Town plans to undertake, we have proposed three Project Managers – Matthew R. Mohlin, P.E., for civil engineering assignments; Anthony W. Kim, P.E., for electrical engineering tasks; and Nicholas F. Bono, P.E. (NY) for sewer pump station improvements. Qualifications for Mr. Mohlin, Mr. Kim, and Mr. Bono can be found in Tab 3. The work for this project will be conducted from H2M’s Windsor, CT, office, which is located 13 miles from the Town of Granby and 17 miles from the school complex. Our proximity lends the Town the benefit of a team that can access the project site easily and meet with project stakeholders. Having successfully delivered a wide range of municipal civil engineering and athletic facility improvement projects for a variety of clients, the H2M team has the requisite skills, multidisciplinary expertise, and resources needed to successfully complete the projects and provide the on-call engineering services envisioned by the Town. We appreciate the opportunity to be considered for this important project. Should you have any questions or concerns, please feel free to contact me at (860) 607-9011 ext. 1034 or email me at glevasseur@h2m.com. Very truly yours, H2M Architects & Engineers, Inc. Gregory J. Levasseur, P.E. Vice President, Windsor Office Director
Page 412
TAB 1
Page 413
1 Project Understanding H2M is pleased to provide this proposal to the Town of Granby for on-call multi-discipline engineering services. H2M is an award-winning, full-service consulting firm specializing in the fields of engineering, architecture, land use planning, environmental planning, and permitting and other related technical fields. Our proposal includes our qualifications, project experience, personnel resumes, and our understanding of the technical scope of services to highlight how our project approach can meet the Town’s specific requirements. In addition, we have included our approach on value-added engineering to assist the Town with any engineering or architectural assignment. H2M understands work may include the following: • Construction of a replacement athletic field/running track and adjacent baseball and softball fields at the high school and middle school complex. • Construction of a year-round bathroom at Salmon Brook Park. • Construction of pickleball courts at Salmon Brook Park. • Assessment and administration of a sewer pump maintenance project. • Other civil engineering tasks associated with a municipality and its capital infrastructure. Kings Park Central School District HS Athletic Field Upgrades & Comfort Station We have been providing services to municipalities since 1933 and are fully staffed with civil, electrical, environmental, mechanical, structural, plumbing, water supply, and wastewater engineers, as well as architects, GIS staff, and construction inspectors. With a diversified staff of over 600 people, we are confident in our ability to bring excellent value to the Town for these projects and any type of professional engineering/architectural services you may require. Since we are a full-service firm, we have the experience, technical staff, and resources necessary to provide you with the specialized services identified in the RFP. Although we are not proposing to offer land surveying, geotechnical engineering or traffic engineering on standalone assignments, we have professional relationships with surveyors, geotechnical engineers, and traffic engineers as well as a network of 275+ subconsultants and subcontractors if needed to support other services H2M manages many on-call contracts with municipalities and public agencies, and we understand the importance of having staff from all our disciplines available to work on projects, as necessary. We have provided similar services to those listed above to numerous municipalities. H2M will provide experienced staff selected by Principal-in-Charge, Gregory J. Levasseur, P.E., based upon their expertise and the specific needs of the project assigned. Project Managers will be responsible for the day-to-day oversight and execution of the projects, project performance, and the direction of the technical staff assigned. Additional information regarding Mr. Levasseur and our Project Managers for anticipated assignments is included in Tab 3. Proposed Methodology We recognize that the exact nature of assignments required by the Town will vary. When our services are requested, we will meet with Town staff to discuss the project scope. After identifying the desired scope, we will prepare a project- specific proposal for the assignment for the Town’s review. If any changes are desired, the proposal can be modified to further customize our approach and execution of the project, which could also include modifications to address timeframe and cost. With an authorization to proceed, we will have a mutual agreement on the services to be rendered. While it is impossible to describe all of our project approaches, we highlighted several below that may be relevant to this contract. ► Capital Project Assignments Scope Phase The specific approach for each assignment under this contract will be dictated by the scope and complexity of the assignment. We will follow the applicable procedures that have already been established by the Town and incorporate them into our procedures. Regardless of the work, an important aspect of every project is the establishment of a proper scope. The scope phase is crucial as it defines the new construction or facility repair/rehabilitation/improvement needs and the work to be undertaken by the consultant. H2M is committed to Town initiatives and objectives and will provide the consistent and regular attention necessary to every phase of the project. During the Pre-Design, Schematic and Design Development phases, H2M will identify and refine project components, creating a living set of documents that satisfy the project requirements by: ► Project Understanding & Approach
Page 414
2 • Consulting with the Town to ascertain its requirements concerning proposed capital improvement work, while implementing and conforming the scope to meet any new rules/regulations, as well as establish projects or group projects to maximize cost savings. • Reviewing all archived as-built information and prior projects recorded at the Town. • Conducting project kickoff meeting with facility staff, Town design team, and other required representatives. • Interview key facility staff and personnel to further delineate needs and define the work scope. • Visiting the site to inspect, investigate, measure, and evaluate existing conditions and related amenities. An investigation of the existing conditions will be included in an “existing conditions report”, if needed. • Confirming history of modifications and corrective work performed if it is known. • Confirming current problems the personnel experience with the operation of the facility. • Confirming current applicable maintenance procedures, and determine if the staff has additional as-built information on site. • Creating probe and testing documentation to aid in the definition of the project scope and construction cost. • Developing preliminary drawings and construction cost opinions. • Preparing and reviewing alternate approaches for the design and construction project and the cost associated with such alternative approaches. • Evaluating critical issues and costs to determine the most value-engineered design. • Prioritizing the capital improvement work to be performed, considering both the projected long-term needs of the Town, their standards, other County, State, or Federal agency approvals, and the protection and safety of the facilities and their occupants. • Developing a preliminary timeline for construction and completion of work for use and occupancy by the Town. Upon gaining an understanding of the project and site- specific issues, we will conduct a site visit with the Town Project Manager prior to initiating the work. We will then meet internally with our project design team to establish clear guidelines relative to the successful completion of the project. An internal Project Plan will be prepared that will identify the following information: • Liaison with Town Project Manager • Project Team Members • Critical Project Design Issues • Required Regulatory Approvals • Construction Budget • H2M Project Team Budget • Project Schedule and Critical Milestones • Meetings with the Town • Internal Meetings and Scheduled QA/QC Reviews • Contract Plan and Specification Guidelines We will obtain and review existing available information and record documents of the project site/facility and make initial contacts with utility companies and potential permitting agencies. During this task, we will make the necessary arrangements to perform several soil borings and pavement cores in the field to assist us in the proper design if required. These geotechnical related services would be provided as a reimbursable expense. Town of Clarkstown Wastewater Pump Station Improvements Preparing a Draft Scope Report for the Town’s Review & Comment Regardless of the assignment, an important aspect of every project is the establishment of a proper program. The Program Phase is probably the most important aspect of the project as it defines the client’s new construction or facility repair/rehabilitation/improvement needs and the work to be undertaken by the consultant. H2M’s role will be to clarify the scope of work, identify design options, construction implications and the associated costs, and communicate these findings and recommendations. As part of this role, it is H2M’s responsibility to bring value to the project by identifying cost-saving options, where viable, and exploring different ways to achieve the project objective. Often items not originally envisioned may be recommended for inclusion in a project to provide a more complete solution or to minimize the cost of remobilizing under a separate future project. To develop viable options and a successful design solution, it is critical that we first develop a thorough understanding of the client’s needs. At the commencement of each project, our team will meet with and conduct a site visit with appropriate Town staff to assess ► Project Understanding & Approach
Page 415
3 and document field conditions and develop the project scope. At this time, as-built drawings and data will be requested from the Town and reviewed. Preparing Preliminary Concept Designs H2M has the depth of experience and expertise to prepare preliminary concept designs for any project assigned. Whether they be ongoing or new proposed developments, we will address the status and/or the conceptual basis for the renovations to new facilities, ADA upgrades, structural modifications to and assessment of existing facilities, rehabilitation and replacement of building elements and systems, services to historic structures or any other projects. The on-call services can be executed competently, effectively and in a timely fashion by our in-house staff of design engineers and architects, who can prepare presentations of any kind to satisfy the requests of the Town. As design professionals, H2M strives to listen, assist, guide, and recommend solutions for our clients in all aspects of architecture and engineering. We have a long history of working with our clients to develop the best solutions for their facility needs within their budgets. Our success in developing the best solutions comes from our ability to design projects using input directly from those that manage the facility. End users also contribute to the design process, so the final product is one that works for the facility personnel and end users, as well as it being visually appealing, organized, well- constructed, efficient, and economical. An important issue we understand through our experiences with this type of work is assisting in the management of a successful relationship between the Town Project Manager and the personnel at the projects. H2M recognizes that the project scope must always be defined through the Town’s guidelines and Project Manager, and that changes in scope cannot be made at the request of the facility personnel without authorization by the Town design team and project manager. Our management and technical staff are trained to work with facility personnel and obtain the project-specific information necessary to have a successful project. We channel the information through the proper protocols so it can be implemented and utilized appropriately and effectively in the project’s design. H2M will prepare preliminary plans and an updated construction cost opinion and identify any special specifications required. The preliminary plans will incorporate the elements initially identified at the kickoff meeting as well as subsequent meetings with Town. These plans will be submitted for Town review and will then be discussed with the Town prior to advancing the plans to contract documents. Design Phase/Construction Document Phase As a full-service firm, having all necessary supporting disciplines under one roof allows us to complete documents quickly and efficiently, with a single source of responsibility. Following the approval of the preliminary plans by Town, H2M will commence with the preparation of the final design, including the production of various documents necessary for construction and permitting. During this phase, we will meet with the Town to make final equipment and material selections where required. During these meetings, we will also obtain input from the Town regarding phasing of the project (if applicable) and contractor staging areas and haul routes, to minimize disruption to the adjoining and nearby properties. Our plans will be developed in accordance with Town, State and other local standards; International Building Code; International Energy Conservation Code; County agency requirements; and all applicable building construction, fire protection, and ADA/ANSI standard regulations. These construction drawings will be coordinated with all support disciplines. H2M will submit the contract documents for review and comment at the 30%, 60% and 90% milestones. As part of the contract documents, electronic specifications will be prepared using the Construction Specification Institute (CSI) MasterFormat™ 2004 edition. Each submission to the Town will include a detailed cost opinion updated as the level of detail in the construction documents evolves. If, at any time, the cost opinion exceeds the funding set aside for this project, we will advise the Town, so that proper arrangements can be made to address this issue. These arrangements may include increasing funding or modifying the scope of work to ensure sufficient funding is available. After acceptance of the final documents, H2M will submit the final contract documents to the Town. This submission will include all deliverables as outlined in scope of services, as well as the final cost opinion and schedule. Bid Phase Support At the Town’s request, H2M can direct the bid phase of a project and comply with the Town bidding procedures. Upon receipt of permit approvals, H2M can: • Produce drawings and specification books. • Respond to questions during the bidding process. • Attend pre-bid walk through. • Prepare any addenda required for clarification purposes. • Review received proposals for accuracy, completeness, and compliance to surety requirements and feasibility with regard to available economic resources. • Record results of the bid proposal meeting and prepare a report summarizing the bidding results and offering recommendations to Town. • Assist the Town with vetting the lowest qualified bidder using our experience to assess and verify the contractor’s qualifications. • Confirm all necessary documents for contract signing and preparation of a notice to proceed. ► Project Understanding & Approach
Page 416
4 Town of Groton Downtown Mystic Drainage Improvements ► Construction Phase Assignments Construction Administration While we take great pride in the quality of our plans and specifications, we recognize they are not the final product. The completed construction is the final product that the Town will inhabit and use for many years. We keep the original design team involved during construction. This gives direct feedback on their designs and instills a sense of ownership. Our Project Manager remains an integral part of the construction administration phase, bringing valuable experience in scope and design forward into construction. The key personnel are assigned to be available either on an as needed or resident basis for inspections and to provide technical review and general guidance to the Town. H2M’s staff is available during the construction phase to support and assist the Town by providing the following services, which have previously proven to be the basis for successful construction projects. During the construction phase of a project, H2M will maintain consistent involvement in the project on behalf of the Town. The key personnel assigned will be available either to provide technical advisement or general guidance to the Town. We will be available during the construction phase to support and assist the Town by providing the following services, which have proven to be part of the basis for previously successful construction projects: • Attend a pre-construction conference and outline certain basic expectations placed on the contractor. • Observe the contractor’s construction activities and progress and compilation of detailed inspection reports. • Review the contractors’ submittals for compliance to requirements such as progress schedule; schedule of values; subcontractor listing; insurance certificates; bonding surety certificates; and contractor references. • Review shop drawings and technical data submittals for compliance to the contract provisions. • Review contractor’s payment requisitions to scheduled values and actual observed progress. • Review contractor change order requests and negotiate acceptable fees. • Perform weekly inspections while work is in progress and as necessary to resolve critical design issues in the field. • Conduct weekly progress meetings with the contractors and Town representatives to discuss issues related to the design, progress of work, and quality of the work and timely completion of the work. Prepare and distribute meeting minutes. • Availability to respond rapidly to encountered field conditions, and to provide technical advisement as necessary to develop practical solutions to problems. • Respond to surety inquiries. • Prepare punch lists for completion of work by contractors. • Review final closeout paperwork submitted by the contractor and execute such paperwork. • If requested by Town, H2M will be available to provide additional consultation/inspection and recommendations regarding warranted action during the one-year maintenance period. If requested, H2M can assist in the preparation of as-built drawings and coordination to ensure the compatibility and incorporation of the documents into the Town’s GIS system. Construction Inspection During construction, H2M can provide quality control in the field by providing full- or part-time construction inspection services for the oversight of work performed by the contractor as requested by the Town. Some Key Elements of our Approach Working with Town Personnel As design professionals, H2M strives to listen, assist, guide, and recommend solutions for our clients in all aspects of engineering. We have a long history of working with our clients to develop the best solutions for their facility needs within their budgets. One of the ways we succeed in developing the best solutions is through our ability to design projects using input directly from the end-users and those that manage the facility. We will partner with the Town during the design process, so the final product is effective for all involved while also being visually appealing, organized, well-constructed, efficient, and economical. An important factor that we understand through our experience with this type of work is assisting in the management of a successful relationship with the personnel at the Town facility where the work is being conducted. Our management and technical staff are trained in how to work with Town personnel to obtain the project-specific information required to successfully complete any task. We also train on how to channel that information through the proper protocols Google Map Data ©2025 ► Project Understanding & Approach
Page 417
5 so that it can be implemented and utilized appropriately and effectively in the project’s design. Point of Contact We understand that the Town’s project manager must have a point of contact within H2M who can field questions and respond to requests in a timely manner. The Town’s project manager should feel like H2M’s entire staff, and the staff of our entire project team is a resource available to him or her, which can simply be accessed by picking up the phone and directly calling our Principal-in-Charge or Project Manager. Regardless of the size or scope of the project, the Town will be able to work with our staff as if they were an in-house design team or technical resource located within the same office. The Town’s project manager and senior construction specialist will be given the contact information of key staff, project leaders, and management team so they can be reached at any time. Quality of Construction It is crucial for any professional engineer to understand the quality of construction, so that the end product is one that fits the needs and requirements of the client. In some cases, quality may mean a particular product or material. Quality does not necessarily have to mean expensive, because with proper planning and/or design, quality may be achieved just by making a design simpler or less complicated. Obtaining the level of project quality that a client desires is a process, one with which we are experienced in assisting. During the project programming process within the Schematic Design Phase, we seek to determine the levels of quality expected by the client so that this information can be incorporated into the design. In the Construction Document Design Development Phase, we further propose options and selections to the client (again seeking input from the end-users and facility managers) to see that the level of quality being proposed is one that is desired. Our more than years of experience allows us to provide insight and suggestions to the client, and often we take our clients to visit our completed projects so that they can see an example of what is available firsthand and decide on exactly what they want. It is important for a client to understand what they are receiving; what level of quality is being described and what is being designed. We have a long history of working with our clients to develop solutions, so that the final product suits their needs and is of the quality they desire. Technology Tools H2M’s staff is proficient with using both Building Information Modeling (BIM), in the form of REVIT, as well as AutoCad Civil 3D to create construction documents. Additionally, technical specifications can be generated using Spec-link E software. The specifications will be updated and tailored to fit the project specifics and will be modified continuously with respect to the most current codes and references. Village of Patchogue Sanitary Sewer Design Communication & Coordination One of our top priorities in every project is ensuring that there is clear and proper communication throughout. Communication is not just about talking and providing adequate documentation but also includes listening and making sure that any information communicated is received and understood. Communication between all team members — the owner, the design professional, and their subcontractors, regulatory agencies having jurisdiction, and general contractor to name a few — is paramount to a project’s success. Everyone needs to communicate, as everyone becomes part of the project team and has an important role that cannot be fulfilled without proper communication. At the beginning of every project at H2M, our Project Manager develops a comprehensive Project Plan that defines the project scope, the client’s needs and expectations, staffing needs, schedule, budget, applicable codes, potential problems, team member roles and lines of communication. The Project Plan provides a road map for the members of the project team and is a living document that is updated as the work progresses. The Project Plan is used as the agenda for the project kickoff meeting and progress meetings throughout the design phase of the project. Project coordination is critical to a project and requires strong lines of communication. In the specialized world we live in, there are many features that get designed into a facility, and each feature requires coordination between multiple disciplines (architecture and engineering, or one engineering discipline with another). Each team member needs to understand the work they need to coordinate with another team member and the information they need to pass on so the work can be done efficiently and effectively. The team proposed for this contract is experienced in working together on similar projects and knows how to coordinate all of the features that are expected to be part of the project types outlined in the RFP. The team knows how to communicate with one another, and they work together project after project. ► Project Understanding & Approach
Page 418
6 Over the years we have developed procedures which include checklists, standard details, coordinated meetings, and assignments of responsibilities for each discipline to ensure the work is done properly. We pride ourselves on our well- coordinated, well-executed construction documents. Project Management Software H2M provides engineering services on a wide variety of project types. H2M utilizes a project information management system (Newforma) to facilitate our staff’s ability to file and manage project information. The primary benefits of Newforma are more efficient document management and retrieval, email management, and construction contract administration. All project emails, meeting minutes, correspondence, project photos, plans, specifications, etc. are saved to the project through Newforma and electronically stored on our network. Action items can be assigned to project team members, including external team members from the Town and contractors, and their status tracked through an automated logging system. Shop drawings are transmitted electronically, and their status tracked through an automated logging system as well as requests for information (RFIs), change order proposals, supplemental sketches, daily reports, and other construction related activities. Action items can also be incorporated into meeting minutes and carried over as required into future meeting minute agendas. Shared folders can also be created to allow access by all team members to share important project information throughout the life of the project. Submittal, RFI, and all other logs are automatically created, and all project information is easily transmitted and stored electronically with easy access by our clients, subconsultants, and contractors. We have found this to be a great tool for our staff, our clients, and contractors while managing projects during design and construction. H2M utilizes BST Project Management software to track all project financial information. This helps our staff ensure that they perform their required assignments within the client’s budget. The BST system is also used as a resource management tool which allows department managers and project managers to schedule staff based on their projected workload. Cost Control Designing a project to stay within the client’s construction budget requires discipline and an awareness of the impact of design decisions and scope changes throughout the design phase. Cost opinions need to be updated at each design milestone, and an awareness of the construction bidding climate is imperative to developing accurate cost opinions. All of our staff are aware of the importance of designing to the project’s budget and we have been very successful at keeping projects within budget for our clients. We typically initiate various cost control procedures throughout each project, including: • Prepare budget estimates at three critical project intervals: Schematic Design, Design Development, and Construction Documents phases. • Review constructability of the systems details during project development. This enables us to review the design/cost relationship to verify adherence to the overall budget and program. • Evaluate the relative cost of systems and product throughout design and construction. All information is maintained on a computer network for the project team to access and review regularly. • Assist the owner in evaluating cost proposals from the contractors throughout the bidding and construction phases. • Develop bid alternatives that maximize value without compromising quality. Closing H2M’s philosophy in dealing with challenges is through proactive, clear, and frequent communication with the Town’s Project Manager. With this approach, complexities and challenges can be addressed head-on and in a timely fashion. We have assembled a highly experienced team to work with the Town of Granby on this project. We are confident in the capabilities of our team in working through project issues as they occur. H2M also believes in teaming with the Town as a valuable participant in the project and process. We will value your input, feedback, and comments. We look forward to closely working together with the Town on this on-call consulting engineering services contract. ► Project Understanding & Approach
Page 419
TAB 2
Page 420
1 Here at H2M, we value people. OPERATING PHILOSOPHY M I S S I O N Our People We commit to developing our people and rewarding hard work with growth opportunities in an inclusive professional environment. Our Clients We commit to being trusted advisors for our clients and delivering problem solving value and quality on every project. Our Communities We commit to creating thriving and healthy communities by giving of ourselves and developing sustainable solutions that benefit everyone. V I S I O N We exist to improve the quality of life for everyone in our reach by empowering our diverse talent to sustainably solve the challenges of the built environment. V A L U E S We Stand as One H2M Inclusive. Supportive. Collaborative. No matter where you are. We Challenge One Another We show up curious and push boundaries. We Do the Right Thing Our character is built on doing what is right and ethical. We Work Safely We care for the lives of our people and their families. We Own it We hold ourselves accountable for team success and personal achievement. We Embrace Diversity We acknowledge and honor the fundamental value and dignity of all individuals. Practical Approach. Creative Results. H2M is a multi-disciplined professional consulting and design firm with a proud legacy of client service and a proven ability to tackle complex engineering, architectural, and environmental challenges. Since 1933, we have played a vital role in shaping local communities — designing and improving essential infrastructure such as water treatment plants, emergency response facilities, schools, roadways, public buildings, and more. With decades of experience, we have built a reputation for delivering high- quality, client-focused solutions that balance innovation with practicality. Our approach is rooted in collaboration, technical excellence, and a deep understanding of the communities we serve. Whether navigating regulatory complexities, addressing evolving environmental concerns, or designing spaces that enhance everyday life, H2M remains committed to providing sound judgment, creative problem-solving, and exceptional service at every stage of a project. H2M takes pride in the depth and diversity of our comprehensive in-house service capabilities. With a team of more than 600 professionals — including engineers, architects, surveyors, scientists, planners, landscape architects, inspectors, and technical support specialists — we provide a fully integrated, multidisciplinary approach to our clients. H2M was organized in 1933 and founded on the principles of professional excellence, hard work, and integrity. H2M Staff by Discipline 177 88 76 51 Architecture Water MEP Environmental 29 36 43 22 Construction Inspection Wastewater Civil Structural 7 7 4 3 Planning Land Surveying Landscape Architecture GIS
Page 421
H2M Services • Feasibility/implementation studies • Energy conservation • Cost/benefit analysis • Commissioning/testing Planning • Comprehensive master planning • Parks, open space and recreation planning • Environmental and natural resource planning • SEQRA and EIS documentation and process support • Community visioning • Zoning ordinances and analysis • Redevelopment studies and plans • Geographic Information Systems (GIS) • Urban design • Strategic solid waste management planning • Stormwater management program planning • FEMA hazard mitigation and resilience planning • Design guidelines • Renderings • Feasibility studies and conceptual plans • Downtown revitalization • Expert private testimony • Municipal board representation Wastewater Engineering • Characterization/quantification of waste • Treatment facility evaluation • Scavenger waste facility design • Outfalls and leaching systems design • Chemical feed systems design • Monitoring and control systems • Nutrient removal treatment systems design • Facility planning studies • Wastewater treatment studies • Wastewater treatment plant design • Wastewater reuse design • Standby power systems • Sludge thickening, dewatering • Sludge treatment, disposal • Odor control • UV and chemical disinfection systems • Sewer system extension planning • User cost analysis • Sanitary sewer design • Sewer rehabilitation studies and design • Infiltration/Inflow evaluation • Pump station evaluations and design • Sewer flow modeling • Security systems • Geographic Information Systems (GIS) • Discharge monitoring reports • Plant performance monitoring • Preparation of O&M manuals • Facility start-up and operations • Groundwater/effluent monitoring programs • Operator training • Industrial pretreatment programs • Prepare/revise sewer use ordinance Water Engineering • Supply well design • Plant rehabilitation design • Water treatment systems • Water filtration systems design • VOC removal treatment systems design • Distribution system analysis and design • Distribution hydraulic modeling • Automated mapping/facilities mapping • Storage tank rehabilitation/repainting • Storage tank design • Tank and coatings inspection • Instrumentation and computer control designs • Comprehensive groundwater modeling • Geographic Information Systems (GIS) • Aquatics and park design • Public swimming pool design • O&M programs • Training programs • Asset management • Solid waste management facility design • Solid waste facility operational assessments Waste and materials quantification and characterization analysis • NYSDEC Part 360 regulatory compliance and permitting • Remedial investigations/feasibility studies • Risk assessments • Above and underground tank management • Soil and groundwater remediation • Soil vapor intrusion studies • Regulatory compliance programs • Industrial hygiene • Indoor air quality • CM/LBP/mold inspections and abatement • Computer modeling • Asbestos investigation and removal • Geographic Information Systems (GIS) Land Surveying • Boundary and title surveys • Topographical surveys • Horizontal and vertical control surveys • Hydrographic surveys • Route surveys • Subdivision planning • Sanitary and drainage study maps • Legal descriptions • Construction layout services • As-built surveys • Architectural surveys • Structural surveys • Under-construction inspection surveys • Easement survey and description Landscape Architecture • Tree inventory and assessment • Tree mitigation • Landscape design and restoration • Conceptual site design • Landscape planning • Illustrative renderings • Landscape architectural detailing • Streetscape and urban design • Parks and playgrounds design • Campus landscape design • Private estate and residential design • Planting design • Wetlands mitigation • Green infrastructure MEP Engineering • Electrical systems design • Feasibility and implementation studies • Power supply • Exterior and interior building services • Closed-circuit television security systems • Emergency power generation • Site/systems and load evaluations • Energy studies • Site lighting design • Fire and security systems • SCADA systems • Utility company rebates and incentives • HVAC systems design • Heat and cooling load analysis • Steam systems • Hydronics • Heat recovery systems • Chillers and cooling towers • Laboratory ventilation systems • Site/systems evaluations Architecture • Architectural design • Comprehensive grant programs • LEED design processes • Interior design • Removal of barriers to the handicapped • Master plans and revisions • Needs assessments • Planning studies • Building conditions surveys • Restoration of historic structures • Restaurant and kitchen design • Zoning ordinance review • Educational facilities design • Assisted living facilities design Civil/Site & Structural Engineering • Roadway reconstruction and resurfacing • Site plan design • Street lighting • Flood control and drainage • Irrigation systems • Sidewalks and curbs • Storm drainage systems • Water mains • Local roadway study and design • Subdivision design • Streetscape design and improvements • Parks, playgrounds, athletic fields • Parking fields • Highway planning studies • Intersection design and improvements • Visual impact analyses • Geographic Information Systems (GIS) • Green infrastructure design • Structural conditions assessments • Structural building design • Structural renovations/alterations • Cause and origin investigations • Retaining walls, bulkhead, and culvert design • Storm hardening/resiliency • Expert testimony Construction Phase Services • Construction management/administration • Resident engineering • Construction inspection (F/T or P/T) • Daily/weekly/monthly project reporting • Utility coordination • Weekly job progress meetings/minutes • Schedule review • Change order processing • Payment requisition processing • Project startup • Commissioning • Prepare punch list • Project closeout • Record drawings Environmental Engineering & Sciences • Air and water pollution control • Hazardous waste management • Hazardous materials storage design • Waste minimization • Environmental Impact Statements (EISs) • Wetland delineation • Environmental Site Assessments (ESAs) • Environmental compliance audits • Environmental permitting • Site investigations • Brownfield assessments 22 H2M Services Capabilities do not apply to all states in which we do business.
Page 422
33 H2M Offices WINDSOR 13 & 17 miles Distance from our Windsor, CT office to the Town and school complex, respectively H2M Office Locations | Connecticut Office “H2M” refers to H2M Architects, Engineers, Geology, Land Surveying and Landscape Architecture, D.P.C. and/or its subsidiary H2M Associates, Inc., and/or its affiliate H2M Architects & Engineers, Inc., as appropriate to the context. Each company’s professional resources are available to the others to the maximum extent permitted by applicable state laws. H2M will not practice, and should not be interpreted to be offering to practice, any professional service for which it and its cognizant employees are not properly licensed. H2M Architects, Engineers, Geology, Land Surveying and Landscape Architecture, DPC (dba: H2M architects + engineers) is a NYS Design Professional Corporation. It maintains New York Certificates of Authorization to provide professional architecture, engineering, geology, land surveying, and landscape architecture services. H2M Associates, Inc. is a New Jersey business corporation. It is a wholly owned subsidiary of the parent company. It maintains New Jersey Certificates of Authorization to provide professional engineering, land surveying, and landscape architecture services. H2M Architects & Engineers, Inc. is a New Jersey business corporation. It is an affiliate of the parent company, being under the ownership and control of a group of appropriately licensed officers of the parent company. It maintains New Jersey Certificates of Authorization to provide architecture and professional engineering services. It is also appropriately structured to maintain certificates of authority to provide architecture and professional engineering services in Connecticut, Delaware, Florida, Louisiana, Massachusetts, Pennsylvania, Rhode Island, South Carolina, and Virginia. 538 Broad Hollow Road, 4th Floor East, Melville, NY 11747 230 West 38th Street, 14th Floor, New York, NY 10018 737 Roanoke Avenue, Riverhead, NY 11701 2 Executive Boulevard, Suite 401, Suffern, NY 10901 1133 Westchester Avenue, Suite N-210, White Plains, NY 10605 433 River Street, Suite 8002 ,Troy, NY 12180 351 S. Warren Street, 2nd Floor, Syracuse, NY 13202 1639 Route 10, Suite 101, Parsippany, NJ 07054 4810 Belmar Boulevard, Wall Township, NJ 07753 287 Grove Street, Building D, Suite 204, Worcester, MA 01605 360 Bloomfield Avenue, Suite 406, Windsor, CT 06095 10 Dorrance Street, Suite 700, Providence, RI 02903 301 Grant Street, Suite 270, Pittsburgh, PA 15219 1650 Market Street, Suite 3600, Philadelphia, PA 19103 1000 North West Street, Suite 1200, Wilmington, DE 19801 951 Yamato Road, Suite 202, Boca Raton, FL 33431 333 SE 2nd Avenue, Miami, FL 33131 100 S. Ashley Drive, Tampa, FL 33602
Page 423
4 Core of Excellence Core of Excellence The Core of Excellence is an H2M exclusive initiative that sets us apart from the competition with a focus on excellence and quality as a core element of our services. It's a firm-wide commitment to deliver excellence through innovative and best-in-class service to our clients, colleagues, and ourselves. H2M's Core of Excellence is comprised of five key components: QA/QC We demonstrate our commitment to ensuring quality at the corporate level through our appointment of a full-time Director of Corporate QA/QC to lead the development, implementation, and oversight of H2M’s Quality Management System (QMS). This commitment is further reinforced by established quality assurance team members who, independent of the project design team, assure that H2M’s components of quality are incorporated. H2M’s QMS is comprised of a combination of processes, tools and resources available to all H2M staff. These include Quality Control Checklists, established QA/QC communication channels, and templates all made accessible thorough H2M’s comprehensive Project Management Framework. SCHEDULING We recognize the importance of timely project delivery and take great pride in our ability to quickly mobilize, assign staff, and complete projects on time. H2M developed a custom scheduling interface allowing for consistent data inputs from the entire firm on a bi-weekly basis. This is transitioning to a centralized scheduling database that allows real-time total team scheduling updates and awareness, allowing H2M to actively adapt our resources to meet the needs of even the most demanding project schedules. We can share detailed, easy to read graphic schedules with our clients, allowing them to always have their finger on the pulse of their project’s timeline. SPECIFICATIONS Our focus and commitment to excellence and quality is further reflected in our Master CSI-based Specifications Library. A dedicated, full-time Specifications Manager oversees the continual development, standardization, and maintenance of our Master Specifications. H2M utilizes a cloud-based specification software platform that allows all users direct access to our Master Specifications Library to develop project-specific spec books. This process ensures that our project specifications include the latest updates in product data and reference standards. BIM/CAD Building Information Modeling (BIM) has revolutionized the A/E/C industry. By using intelligent 3-D digital models to generate our designs, H2M can achieve a higher level of quality, consistency, and efficiency in our production process, minimizing the potential for change orders during construction. We employ a full-time, dedicated, and independent team comprised of design professionals and BIM-CAD specialists whose primary responsibilities are to create, deploy, and maintain company- wide standards, templates, procedures, and workflows. Our adoption of BIM has been the single most important change in how we design and manage our projects. SAFETY Safety is essential at H2M. We employ a dedicated corporate health and safety manager within the Core of Excellence. H2M has established mandatory safety training and is actively implementing the Plan-Do-Check-Act methodology. By incorporating safety into our overall quality management systems, we ensure that all of our staff can get home safely each day and that we proactively respond to our clients’ health and safety requirements. CLIENT BENEFITS Well-coordinated construction documents that reduce project change orders and minimize cost overruns Consistent quality and proven performance Optimized resource allocation to meet project demands Increased compliance with the latest industry and regulatory standards Enhanced project visualization via 3D modeling Improved collaboration among all project stakeholders
Page 424
5 9 Local Connecticut presence 9 Extensive athletic field/ track expertise 9 Municipal on-call experience 9 Multi-discipline services under one roof 9 Extensive storm water and drainage experience 9 Ability to support future capital projects beyond the known assignments References H2M has extensive experience designing athletic fields and providing various on-call engineering services. The firm prides itself on building a strong rapport with clients, serving them as trusted advisors with sound judgment and creative solutions to their unique challenges. We encourage you to contact our references below to verify our successful track record. ► Town of Groton Downtown Mystic Drainage Improvements Geoffrey Foster, P.E., Deputy Director of Public Works 860-448-4072 ► Incorporated Village of Malverne Drainage & Athletic Improvements Timothy Sullivan, Mayor 516-599-1200 ► Somers Central School District Athletic Site Upgrades Christopher Platania, Assistant Superintendent for Business and Operations 914-277-2410 ► Westchester County Department of Environmental Facilities Pumping Stations Rehabilitation Vincent F. Kopicki, P.E., Commissioner 914-995-2546 ► Town of Newtown Water Distribution System Replacement Fred Hurley, Director of Public Works 203-270-4300 ► References
Page 425
19 1 2 3 4 5 6 7 8 9 10 11 12 13 15 16 17 18 20 21 22 23 24 25 26 27 14 28 29 30 31 32 33 34 Carle Place HS - Baseball + Multipurpose Field East Islip MS - Multipurpose Field East Islip HS - Baseball + Multipurpose Field Howitt MS - Baseball, Softball + Multipurpose Field Louis M. Klein MS - Baseball + Multipurpose Field Woodmere MS - Multipurpose Field Hewlett HS - Multipurpose Field Island Trees HS - Multipurpose Field Kings Park HS - Multipurpose Field L.I. Lutheran MS + HS - Multipurpose Field Howard T. Herber MS - Baseball Field Massapequa HS - Baseball + Multipurpose Field Alfred G. Berner MS - Baseball + Multipurpose Field Newfield HS - Baseball Field Centereach HS - Baseball Field Selden MS - Soccer Field Mount Sinai MS - Multipurpose Field Smithtown HS West - Multipurpose Field Smithtown HS East - Multipurpose Field Walt Whitman HS - Multipurpose Field Syosset HS - Baseball + Multipurpose Field Sleepy Hollow HS - Multipurpose Field Washington Irving Intermediate - Multipurpose Field Manhasset Valley Park - Baseball + Multipurpose Field North Hempstead Beach Park - Baseball Field White Plains HS - Multipurpose Field Highlands MS - Multipurpose Field Uniondale HS - Multipurpose Field John Street ES - Baseball Field Dominican College - Multipurpose Field Somers HS - Baseball + Softball Field Harrison HS - Baseball Field Baldwin HS - Multipurpose Field Monsignor McClancy Memorial HS - Multipurpose Refer to the map, key and corresponding list of service areas below to see where H2M has designed synthetic turf fields. Synthetic Turf Fields 1 2 3 4 5 6 7 8 9 10 11 12 13 14 24 25 26 15 16 17 18 19 20 21 22 23 27 28 29 30 31 32 33 34 6
Page 426
Drainage Improvements • Town of Groton Groton, CT SERVICES PROVIDED Drainage Analysis Drainage Design Community Engagement Permitting Funding Assistance Construction Cost: TBD H2M is providing engineering design services to support drainage improvements in the Downtown Mystic area, specifically along Gravel Street and Pearl Street, which are susceptible to coastal and tidal flooding. The project is driven by recommendations outlined in the Town’s resiliency planning efforts and focuses on improving stormwater management, mitigating flood risks, and enhancing long-term infrastructure performance. H2M’s scope includes evaluation of existing drainage infrastructure, watershed analysis, and development of design solutions to address runoff, capacity limitations, and projected sea level rise impacts. Services include hydrologic and hydraulic modeling and preliminary and final engineering design for system upgrades such as drainage improvements, tide control measures, and upstream detention strategies. The firm is utilizing a subconsultant for land surveying services and catch basin cleaning to obtain existing drainage system data. The project also incorporates stakeholder coordination and community engagement to obtain input on design decisions, as well as preparation of permitting documentation and support for environmental approvals. H2M is advancing the project through phased design, including preparation of a Basis of Design Report, preliminary and final contract documents, and construction cost estimates. The project supports the Town’s goals for resiliency, regulatory compliance, and protection of critical coastal infrastructure.
Page 427
Athletic Field Upgrades • Massapequa Union Free School District Massapequa, NY SERVICES PROVIDED Land Surveying Site Engineering Athletic Field Design Stormwater Modeling Stormwater Pollution Prevention Plan Electrical Engineering Construction Cost: $3.5 million AWARDS ♦ ACEC New York - Diamond Award H2M was selected to design several critical improvements to the existing athletic complex at Massapequa High School. While the athletic fields at the Massapequa High School Main Campus provided an excellent venue for the student-athletes and community members to participate in sporting events, the Massapequa Union Free School District recognized the need to renovate and improve the aging and worn facilities to best accommodate the needs and demands of the student-athletes and burgeoning Massapequa community. H2M was selected to design several critical improvements to the existing facility, including adjusting the overall layout, incorporating pathways and bleachers to improve accessibility at the complex, and converting the original natural grass athletic fields to a synthetic turf to allow for more frequent use and reduce annual maintenance cost. To manage runoff peak flow rate and water quality volume, underground stormwater linear leaching chambers were installed in lieu of traditional concrete drywells due to shallow groundwater conditions. The series of low-profile, open-bottomed underground linear leaching chambers were incorporated to provide runoff storage capacity while creating a separation distance between the bottom of the chambers and the water table. New ADA-compliant walkways and emergency vehicle access, as well as a new permanent bleacher seating area were among the social considerations taken. Economically, the implementation of synthetic turf proved to be more cost-effective for the District, reducing the level of maintenance. Through the implementation of synthetic turf and new stormwater management system, the amount of fertilizers, pesticides, and contaminants reaching downstream waterbodies would be reduced, lessening the impact to the environment by improving the water quality of runoff to South Oyster Bay, a New York State 303(d) impaired waterbody. The complexity of this project arose from site constraints – namely shallow groundwater and the limited space available for each of the desired project features. These constraints required H2M to be creative when selecting and laying out the new underground stormwater chamber system. Utilizing the space underneath the “D-Zone” of the multi-purpose field and the space adjacent to the proposed tennis courts to house the chambers provided a centralized storage location to which on- site drainage pipes could convey runoff. The location also helped to minimize conflicts with underground and surface site features, and provided enough space to accommodate the large footprint needed to meet New York State Water Quality Volume and peak runoff rate requirements while still maintaining a separation distance between the chamber system and groundwater.
Page 428
Sanitary Sewer Pump Station Design • Borough of Ramsey Ramsey, NJ SERVICES PROVIDED Pump Station Design Sewer Force Main Design Temporary Bypass Permitting Construction Related Services Construction Cost: $280,000 Our team designed the replacement of a 30-year-old ejector system with a new duplex grinder pumping station and new force main. A temporary bypass system was in place during construction to maintain service to the Borough’s customers. Sanitary sewers were constructed on Brookfield Lane and Meadowbrook Road in the 1970s to serve 12 single-family residential homes and a veterinary hospital. A sewage ejector station was originally constructed at that time as a temporary measure until a tributary gravity sewer was constructed in Upper Saddle River. However, the gravity sewer was never built. The existing gravity sewer on Brookfield Lane, from which the force main flows, is tributary to the Northwest Bergen County Utilities Authority (NBCUA). The Brookfield Lane system has an estimated daily flow of 5,200 gallons per day (gpd). Due to aging components within the 30-year-old ejector station, the Borough of Ramsey desired to replace it with a new, modern, submersible pumping station, including a valve vault. We designed a new pump station, along with a new small diameter force main. Our team obtained the required Treatment Works Approval (TWA) from the New Jersey Department of Environmental Protection (NJDEP) and Flood Hazard Area Individual Permit. The new facility includes a 60-inch diameter, fiberglass wet well, and grinder pumping station in the same location, inside a fenced in gravel area at the end of Brookfield Lane. The duplex pump station is designed so that each pump is capable of handling 2.5 times the average daily flow. A pressure level transducer is connected to the pump controller, which is mounted aboveground in a cabinet to turn the pumps on and off. The pumps operate in a lead-lag system, with the lead pump having an ‘on’ elevation set 6 inches below the lag. The wet well has a concrete anchoring system that counteracts the effects of buoyancy on the fiber glass wet well. Additionally, a 48-inch inside diameter concrete valve vault was constructed. The existing 4-inch diameter ductile iron pipe force main was replaced with a new 2-inch diameter PVC force main. The flow velocity through the new force main is above 2.5 feet per second to scour out any solids which may settle. A temporary bypass system was employed to maintain service to the system’s customers. The bypass was created by plugging the first existing sanitary sewer manhole outside the ejector station, allowing wastewater to accumulate (acting as a temporary wet well), and then pumping to a manhole at the crest of the road that would then gravity flow to the sanitary sewer system. The bypass pumps were powered via a temporary electric service connection, with its own electric meter and account.
Page 429
Well Rehabilitation & Water System Distribution Replacement • Town of Newtown Newtown, CT SERVICES PROVIDED Distribution System Electrical & Instrumentation Upgrades Construction Cost: N/A H2M is designing and implementing the replacement water main for the Fairfield Hills Water System campus hub, water main relining, and rehabilitation of Well No. 8, including mechanical and electrical upgrades. As part of a program to provide reliability and redundancy to the Fairfield Hills Water System, Well No. 8 needed a total rehabilitation. Well No. 8 is currently inactive, leaving the Town’s Well No. 7 as the only active source of water. The work encompassed the replacement of the well pump, column assembly, and motor. Additionally due to deteriorating quality of the well screen, a new well liner was required. The new pump was selected to be a vertical turbine to adhere to the Town’s standards. The entire electrical system required replacement and upgrades. The new system will be integrated with the Town’s SCADA system. In coordination with the Town of Newtown, H2M provided the most cost-effective solution to completely rehabilitate the Fairfield Hill’s distribution system combination, including new HDPE water main and lining for existing cast iron water main, either in the paved roadways or in the grass areas as much as possible. A complete rehabilitation is required due to brown water present in the system if it is not flushed frequently and sequenced to avoid aging water. Along with replacing and lining water mains, valves and hydrants were replaced or newly installed as required in accordance with American Water Works Association (AWWA) standards and State of Connecticut Department of Public Health standards. As Well No. 8 is the only backup for the Fairfield Hills water system, should Well No. 7 fail or become inactive, H2M separated the rehabilitation from the water main portion of the project to allow for this critical work to be bid sooner.
Page 430
Drainage Improvements • City of New Rochelle Department of Public Works New Rochelle, NY SERVICES PROVIDED Civil Engineering Surveying Construction Cost: $2.35 million AWARDS ♦ ACEC New York - Platinum Award The City of New Rochelle selected H2M to design improvements to existing drainage systems that serve a 2,000-acre watershed. The existing drainage system encompassed more than 5,900 linear feet of storm drain pipe that ranged in size from 12 to 66 inches in diameter, including a 55” x 38” box culvert. Improvements were required to address significant flooding events within residential communities that occurred in 2007. A series of storms resulted in many homes and streets being flooded due to a drainage system that lacked the capacity to convey the intense rainfall. Portions of the existing drainage system were more than 100 years old and the system had been modified and extended numerous times since its original construction. As a result of this “piecemeal” construction, numerous types of unorthodox construction methodologies were utilized to connect the various sections of the drainage system. Record plans were contradictory, so H2M staff conducted an accurate inventory and field survey of the existing drainage systems. This included a physical observation of each accessible catch basin, manhole and junction box in order to verify pipe sizes, pipe routing, and inverts. To supplement the visual observation, video observations and tracing dye were utilized to confirm pipe routing in areas where record information was unreliable or could not be field verified. Once an accurate plan was developed for the existing system, appropriate improvements were designed based on a recent drainage study conducted by the City. Design improvements included combining parallel drainage lines, increasing pipe capacities and improvements to various drainage structures to improve hydraulics of the piping system. H2M prepared plans and specifications, and provided construction administration and observation services for the project.
Page 431
Watershed Drainage Analysis • City of New Rochelle New Rochelle and Mamaroneck, NY SERVICES PROVIDED Drainage Evaluation Concept Plan Report Topographic Surveys Hydrologic Analyses Hydraulic Analyses Drainage Design Construction Cost: N/A The City of New Rochelle selected H2M to study the Pinebrook watershed to investigate known flooding and icing problems and develop solutions to address the flooding. H2M is working closely with the City’s Program Manager, Brooker Engineering, to meet the intended goals of the project. The Pinebrook watershed is located in the eastern portion of the City. Portions of this watershed extend outside of City limits into the adjacent Town of Mamaroneck. A total of 36 known flooding issues have been identified throughout this watershed. In addition, one critical facility is located within this watershed. We began by reviewing the list of known flooding locations and observing each area to familiarize ourselves with the nature of every drainage problem. H2M met with representatives from the City and Brooker to review the known flooding locations and critical facilities throughout the watershed. Topographic surveying was required where limited information was available for certain locations. H2M then developed a “Concept Plan Report” that summarized the potential cause of flooding, proposed analysis scope and additional data/survey required, and proposed hydrologic and hydraulic methodology intended to evaluate potential solutions. We also completed hydraulic and hydrologic analyses of the study area. Our analyses included 2-, 10-, 25- and 100-year recurrence interval storms. H2M reviewed the FEMA hydrology for FEMA- studied streams We utilized Bentley SewerGEMS software and the United States Soil Conservation Service (SCS) Method to calculate peak runoff rates for various storm frequencies and HEC-RAS for stream modeling. H2M is currently designing alternative drainage solutions for the 36 locations. For each alternative drainage solution, we prepared concept plans, cost opinions, and a cost-benefit analysis using the FEMA BCA Toolkit Software. A final report will also be provided containing map inventories, stormwater analyses, major findings, recommendations, priorities and cost opinions. The report will also include a watershed summary that summarizes the results of the study. Due to the anticipated large scale of the proposed improvements, the report will also identify the areas where the most and least favorable cost-benefit ratios have been identified so that improvements can be prioritized.
Page 432
New Wastewater Pump Station • Nassau County Department of Public Works Hempstead, NY SERVICES PROVIDED Design Report Engineering Design Construction Documents Bid Services Construction Administration O&M Manual Construction Cost: $6.8 million As part of the Barnes Avenue Sanitary Sewer Overflow Correction, H2M acted as a subconsultant to plan and design the Hempstead Wastewater Pump Station. The new conveyance system will divert a portion of the wastewater in the Village of Hempstead to a different wastewater collection system. H2M prepared a technical design report for the 5.85 million gallon per day wastewater pump station in accordance with applicable articles of Chapter 10 of the Recommended Standards for Wastewater Facilities, the standards of the NCDPW, and the benchmark base level Security Measures for pumping Stations in the ASCE/AWWA/WEF Guidelines for the Physical Security of Wastewater/Stormwater Utilities. In addition, a construction cost opinion, a project schedule, and a preliminary list of drawings and technical specifications for the work were also presented. Our effort was coordinated with the prime consultant that was responsible for the design of the 14,800 foot long 30 inch diameter force main. The pump station was constructed on a small triangular site between three high-traffic roadways. The final design included a new pump station with a divided wet well with two submersible pumps in each; installation of new precast concrete control and generator buildings with field installed exterior finishes; a new diesel fueled stand-by generator and double-walled fuel tank; emergency force main connection and flow meter; a new backflow prevention device on water service; new electric service; activated carbon vessel for odor control on the ventilation duct for each wet well; and a perimeter security fence.
Page 433
Roadway Stormwater Improvements • Nassau County Department of Public Works Laurel Hollow, NY SERVICES PROVIDED Bidding Services Regulatory Permitting Site Engineering Stormwater Management Drainage Design Construction Cost: $160,000 The Nassau County Department of Public Works (NCDPW) engaged H2M to design stormwater drainage improvements along Cold Spring Road in Laurel Hollow, NY. Stormwater runoff on Cold Spring Road collects at a low point located on a Nassau County-owned property and encroaches on neighboring properties during larger rain events. The resultant flooding and standing water creates public health and safety hazards for nearby residents. H2M’s initial design incorporated a 180,000-cubic-foot stormwater recharge basin in accordance with NCDPW standards, as well as a drainage collection system to redirect runoff from adjacent private properties toward the recharge basin. However, it would cost the County approximately $575,000 to construct the basin and collection system, which exceeded the project’s available budget. H2M proposed an alternative solution that would address flooding of nearby private property at a smaller price point. The new plan, at a cost of $160,000, involved placing fill on private property to eliminate low-lying areas and excavating portions of County property to offset the storage volume lost due to the placement of new fill. The County accepted this alternative solution and, after obtaining a building permit from the Incorporated Village of Laurel Hollow, construction was underway.
Page 434
H2M provided preliminary design, construction documents, and construction phase services for a new picnic area restroom building to replace an outdated facility. This project consisted of new fully accessible men, women, and family toilet facilities at Bethpage State Park to replace an old and outdated facility. The building is situated adjacent to a major parking field and picnic areas. The building as well as access to the building was made fully accessible in accordance with the Americans with Disabilities Act (ADA) and the facility was constructed out of durable/low maintenance materials, with low maintenance interior finishes. A masonry structure with a brick water table and cedar shake facade and a wood truss roof with architectural grade asphalt shingles was provided, emulating the architectural features of other Bethpage State Park structures. The iconic Bethpage State Park golfer was incorporated into the tile pattern within the building. The project scope also included new utilities, including electric, water, and an on-site sanitary system. New Park Rest Area Architecture Structural Civil Survey Construction Cost: $477,000 New York State Office of Parks, Recreation, and Historic Preservation Bethpage, NY SERVICES PROVIDED Mechanical Electrical Plumbing
Page 435
Culvert Replacement • Suffolk County Department of Public Works Smithtown, NY SERVICES PROVIDED Stormwater Management Drainage Design Stormwater Outfall Mapping Construction Cost: $1.1 million H2M was retained to assess possible improvements to address localized flooding around the northeast branch of the Nissequogue River. Upon H2M investigating the possible improvements to address localized flooding around the northeast branch of the Nissequogue River, one solution identified was the replacement of two culvert crossings at Branch Drive and Terrace Lane in The Branch. The existing culvert did not possess the required capacity to convey the flow from a 10 year storm event. H2M was able to avoid costly bypass pumping or stream diversions by taking advantage of the existing multiple pipe culvert system at both locations. Although the overall culvert capacities were inadequate to convey the design storm flow, individual pipes were capable of conveying the low base flow. Existing pipes were left in place to convey the basic flow while the new culvert was installed.
Page 436
Drainage Improvements • Town of Clarkstown New City, NY SERVICES PROVIDED Topographic Survey Civil Engineering Inspection Construction Cost: $260,000 Residents of Denver Drive were facing a significant flooding problem as a result of inefficient geometry of a pipe culvert and catch basin. The Town selected H2M to resolve the flooding. The existing culvert included 90 degree bends and an integral catch basin, which affected the hydraulic capacity of the culvert. H2M developed a computer model to determine the peak flows from the tributary watershed to address this situation. In addition to removing the 90 degree bends, our evaluation identified the need to increase the existing pipe capacity. Changing the geometry of the culvert required obtaining easements from several homeowners. H2M developed easement maps to assist the Town with obtaining these easements to construct temporary, as well as the new outlet. The final solution to resolve the flooding was to install a 71 inch by 47 inch corrugated metal pipe arch that would be large enough to convey the water from the stream under Denver Drive.
Page 437
Flooding Remediation • Town of Clarkstown New City, NY SERVICES PROVIDED Civil Engineering Inspection Topographic Survey Construction Cost: $410,000 The Town of Clarkstown was experiencing major, damaging flooding along a critical town roadway that caused several closures of the town municipal pool center and significant economic loss from flood recovery. H2M was selected by the Town to investigate the cause and recommend solutions. Drawing on decades of experience in stormwater and sewer design, along with our team of hydraulic engineers, we developed a hydraulic model of the existing 600 acre watershed tributary to an existing drainage culvert, which was identified early on as a likely factor in the flooding. Recognizing that community development had increased the impervious nature of the watershed from its 1950s origin, appropriate runoff coefficients and IDF curves were used in the model and established the existing 18-inch diameter corrugated pipe drain feeding the culvert was severely undersized. Working with Town leadership we assisted in stakeholder outreach with private property owners and private utility companies including United Water, Orange and Rockland Gas, and Orange and Rockland Electric to develop a project plan for solving the problem. We developed contract documents for the replacement of the existing culvert with an 8 foot by 4 foot concrete box culvert that crossed under Lake Nanuet Drive and private property. The design also required the relocation of various other utilities, including the redesign of a sanitary siphon to allow for the box culvert installation. Also included in the design were recommended improvements to the Best Management Practices (BMP) that stabilized the surrounding stream, controlled critical velocities and minimized impacts due to erosion. We assisted the Town with acquisition of temporary and permanent easements and ensured all stakeholder matters were addressed in a timely manner, allowing for a successful project implementation that was on schedule and on budget. We also developed and implemented a Maintenance and Protection of Traffic Plan (MPT) for necessary construction detours.
Page 438
Roadway Improvements • Town of Clarkstown West Nyack, NY SERVICES PROVIDED Construction Administration & Inspection Erosion & Sediment Control Plan Landscape Design & Restoration Retaining Wall & Culvert Design Roadway Design Site Engineering Site Grading & Drainage Streetscape Design SWPPP Reports & Inspections Utility Coordination Construction Cost: $10.1 million The Town of Clarkstown, NY, hired H2M to design culvert, roadway, and streetscape improvements to West Nyack Road. H2M’s design work was Phase 2 of a broader initiative to mitigate flooding, enhance the Town’s open space portfolio, and integrate the Hamlet Green & Firefighter Memorial Park, which H2M restored during Phase 1, into the heart of West Nyack’s business community. Adjacent to the park is West Nyack Road, a two-lane, 2,100-linear- foot roadway that connects the park to businesses at the western end of the road, but lacked comprehensive walkway connectivity. The site also featured undersized culverts connecting channels on the north side of West Nyack Road to the wetlands south of the road. The redesign replaced the two undersized culverts and raises the elevation of West Nyack Road to incorporate additional drainage infrastructure. New sidewalks running the length of West Nyack Road now connect the park with the business community. Furthermore, West Nyack Road has been widened to provide additional on-street parking and re-aligned, along with West Nyack Way and Klein Avenue, to create a new four-way intersection. Other renovations include new off-street parking, street lighting, traffic calming features, plantings, and a small pocket park with a fountain to serve as the centerpiece of the Phase 2 improvements. H2M also coordinated with local utility providers to relocate existing overhead utility infrastructure underground. Additionally, Con Edison had advised of its intention to install a new underground service line below West Nyack Road; prior to construction, H2M revised plans to incorporate the new utility line into the renovation design.
Page 439
Sanitary Sewer Improvements • Town of Clarkstown New City, NY SERVICES PROVIDED Engineering Design Facility Planning Construction Administration Construction Oversight Construction Cost: $2,515,000 The Town of Clarkstown selected H2M to rehabilitate various portions of the existing sanitary sewer collection system within the Town with construction taking place over several years. The existing sewers selected were based on previous studies and maintenance records to have signs of infiltration which is contributing excess flow to the receiving sewage treatment plant. The force mains selected were those that have shown signs of leaking or are being re-sized due to pump replacements in order to meet current design standards. H2M prepared an engineering report that described the existing sanitary sewers, described the proposed improvements and presented cost opinions for all of the proposed work. For each project, a sewer construction contract was prepared for the work. The projects included: Project 1: • Lake Nanuet Park – 613 LF eight inch diameter gravity sewer with 150 LF double barrel inverted siphon Project 2: • New Haven Avenue – 564 LF 10 inch diameter gravity sewer replacement • Dykes Park Road – 1,408 LF eight inch and 10 inch diameter gravity sewer cure-in-place lining • Long Clove Road – 1,975 LF four inch diameter force main piping replacement • Van Doren Court – 770 LF three inch diameter force main piping replacement • North Greenbush Road – 696 LF three inch diameter force main piping replacement • Holland Drive – 704 LF four inch diameter force main piping replacement Project 3: • North Main Street – 2,700 LF 12 inch diameter gravity sewer replacement Project 4: • NYS-Route 303 – 1,721 LF eight inch diameter gravity sewer lining • Pineview Avenue – 978 eight inch diameter gravity sewer lining • Aberdeen Drive – 2,639 LF eight inch diameter gravity sewer lining • During construction, H2M provided periodic construction observation, reviewed shop drawings, and reviewed contractor payment requests.
Page 440
Stormwater Wetland Development • Town of Clarkstown New City, NY SERVICES PROVIDED Stormwater Evaluation Site Evaluation Drainage Design Stormwater Outfall Mapping Construction Cost: $7.7 million H2M was retained to develop a stormwater management plan containing green infrastructure practices to mitigate flooding and improve water quality within the West Nyack section of the Town of Clarkstown. Green infrastructure practices include a stormwater wetland retrofit. In addition, the project also includes improvements to two culvert crossings, the realignment of West Nyack Road, and renovations to an existing park and playground. Using stormwater management software, H2M modeled the 198 acre tributary area of an existing degraded wetland system, as well as the associated stormwater conveyance systems, and used the results to design a stormwater wetland retrofit at the site capable of managing the runoff from the entire tributary area. The constructed wetlands combine shallow marsh areas with permanent pools to provide a stormwater management practice capable of providing extended detention, improving water quality and reducing the potential for flooding during storm events. The developed area also creates a new habitat for area wildlife.
Page 441
Coastal Stormwater Drainage Study •
Town of Hempstead
Hempstead, NY SERVICES
PROVIDED
Civil Engineering Stormwater Modeling
Construction Cost: $300 million
!(
!(
!(
!( !(
!(
!(
!(
")
")
!(
!(
")
")
!(
!(
")
")
!(
!(
")
!(
")
!(
")!(
")
!(
!(
")
!(")
")
")
")")
!(")
!(
!(
")
")
")
!(
")
!(
")!(
")
!(!(
!(
")
")
")
")
")
")
!(
")
")
")
!(
!(
")
")
")")
!(
")")!(
")
")
")
!(")
!(!(
")
!(
!(
")
")
!(
")
")
!(
")!(
")
")
")
")
!(
!(
")
")
")
")
!(
")!(!(
!(
")")
")
!( !(
") !(
!(
!(
!(
")
")
")
!(
!(
!(
!(
")
!(
")
!(
!(!(
")
")
!(
")
!(
")!(
!(
")!(")
!(
!(!(
!(
!(
!(
")!(
")
")
!( ")
!(
")
")
")
!(
")
")
!(
")
!(
")
")
!(
")
")
")!(
!(
!(
")
")
")!(
")
")
")!(
!(
")
!(
") ")
!(") ")
!(
!(
") ")
")
!(
")
") !(
") ")
!(")
")
")") !(")!(
!(")
")!(
!(
!(
!(
")!(
!(
!( !(
!(
")")
!(
!(
!(
!(
")
!(
!(
!(
")
")
!(
")
!(
!(
!(
")
!(!( !(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
")
!(
!(!(
")
")")
")
!(
") !(
")!(
")
!(
!(
!(
")
")!(!(
!(
!(
")
!(
!(
!(
")!(
!(
")
")!(
!(
!(
!(
")
")
")
")
!(
")
")
")
")
!(!(
!(
")
!(
!(
")
")
!( !(
!(!(")
!(
")!(
!(
!(
!(
!(
!(
")
")
")
")
!(
")
") !(
!(
") ")
")
!(
!(
!(
")
!(
")
")
!(
!(
!(
")
")
!(
")
!(
")
")
!(
!(
!(
!(
!(
!(
")
!(
")")
!(
!(!(
")
!(
")
!(
")")
!(
")
")
!(")
!(
")
")
")
!(
")
")
!(
!(
!(")
")
!(
")
!(
")
") ")
")
!(
!(
")
")
")
")
!(
!(
")
")
!(
!( ")!(
")
!(
!(
!(!(")
!(
!(
")
!(
")") ")
")
!(
!(
")")
!(
!(
")")
!(
!(!(
!(
!(
!(
")
")
")
")
!(
")
!(
")
!(")
!(
")
!(
!(
")
")
")")
!(
")
")
!( ")
!(
!(
") !(
!(
!(
!(
!(
!(
!(
")
!(
!(
!(
")
!(
")
")
!( !(
!(
!(
") !(
!(
")
")!(
")")
!(
!(
")
")
!(
!(
!(
!(
!(")!(
!(
")
")")
")
!(
")
!(!(
!(
!(
")
")!(
!( ")!( !(!(
!(
")
")
")
!(
")
")
")
")
")
!(
")
")
")
!(")!(
")!(
")
")
!(
!(
")")
!(
!(
")
")
!(
")
")
!(
")")
!(
")
!(
")
")
")
")
!(
")!( !(
!(
") ")
!(!(
")
")
!(")
")
")
")
")
!(
")
")
!(
!(
!(
!(
")
!(
")")
")
!(
")")
!(
")
")
")
!(
!(")
")
")
")
")
!(
!(
!(
!(
!(
")
")!(
")
")
!(
")")")
")
!(
")
")
") ")
")
")
!(
")
!(
!(
!(
")
")
!(
!(
!(
!(
")
")
!(
")
")")
!(
")
")
")
")
")
!(
!(
!(
!(
!(
")
!(
")
")
")
!(
")
!(
!(
!(")
!(
") !(
!(
!(
!(
")
!(
!(
!( ")
!(")
")
")
")
") ")
")")
!(
!( !(
!(
")
!(
")
")
")
")
")
")
")")
!(
!(
")
")
!(")
")
!(
")
")
!(
!(
!(
!(!(
!(
") ")
!(
")
")
")
")
")
")
!(!(
")
")!(
!(
!(
!(
")
")
")
!(
!(
")!(
")
!(
!(
")
!(
")
")
!(
!(
!(")
!(
!(
")
")
")
!(
!(")
")
!(
") ")
")
")!(
")
!(
")
!(
")
")!(
!(
!(
")
!(
")
")
!(
")
")
!( ")
!(
!(
!(
!(")
")!(
!( !(
!(
!(
")
!(
")
")
!(
")")
")!(
") !(
")
!( ")
!(
!(
") !(
!(
")
!(
!(
")!(
") ")
")!(
!(
")
!(
")!(
")
!(
") ")
")
")
!(
")
")
!(
!(
")
")
")
!(
")
")
!(
!( ")
")
")
") !(
")
!(
")
!( !(
!(
!(!(
")
!(
!(
!(
!(
!(
")!( !(
")
")")
")
!(
")
")
")!(
")
!(
!( ")
!(!(
!(
!(
")
!(
")")!(
")
")
!(
!(
!(
!(
!(
!(
")
!(
!(
!(")")
")
!(
!(
!(
!(
")
")
!(
")!(
!(
")
!(
!(
!( ")
!(
")
")")
!(
!(
")
!(
")!(
!(
!( ")
!(
")
")
")")
")
!(")
")")
!(
!(
!(!(
")
")!(
!(
!(
!(
")
")
")
!(
")
!(
")
")
!(
!(")
")
")
")
!(
")
!(
")
!(")
!(
")
!(
!(
")
!(
") !(
!(
")!(")
!(
!(
")")
!(
!(
") ") ")
!( !(
!(
")
")")
") !(")
")")
")
!(
!(
!(
!(
!(
")
!(
!(
")
!(
")
!(
!(
")
")!(!(
!(
!(!(
")
")
")
")!(
")
!(
!( ")
")
!(
")
!(
!(
!(
!(")
")
")
!(
!(
")
")
!(
")
") ")
!(
")")
!(
!(
!(
!(
!(
!( !(
")
")
!(
!(
!(!(
")
")
!(")
")
!(
!(
")
!(
!(
") !(!(
!(
!(
!(
!(
!(
!(
!(
!(
")
")
!(
")
")
")
!( !(
")
!(
")
")
")
")
!(
!(
!(
!(
!(
")")
")")
!(
!(
")
")
!(
")
!(
!(
")
")
!( !(
!(
")
!(
")")
")
")
!(
!( !(
!(
")
!(
!(
")
")
")
")
!(
") ")
")
!(
!(
")
!(
!(
")
")
!(!(
!(
")
!(")
!(
")
!(
")
")
")
")
!(
")
")
")
")
")
")
!(
!(
!(
!(
")
!(
")
")
!(
")
!(
!(
!(
")
") ")
!(
")
!(")") ")!(
!(
")!(
")
")
")
!(
!(
!(
")
!(")
!(
")
!(
")")
!(
")
")
!(
!(
!(
")
!(
")
!(
")
!( ")
!(")
")
!(
")
")
!(
")!(
")
!(
")
!(
!(
")
")
!(
")
!(
")!(
!(
!(")")
!(
!(
!(
!(
")
")")
")
")
!(
")!(
")
!( ")
")
!(
!(
")
!(")
")
!(
")
!(
!(
!( !(
!(
!(
!(
")
!(
!(
")!(
")
!(
!(
")")
")
")
")
")
")
!(
!(
!(
!(
!(
")
")
!(
")
!(
")!(
")
")
!(
!(
")
")
")
")
")
")")!(
!(
!(
!(
!(
")
")
")
")
")
!(
!(
")
!(
")
!(
!(
")
")
!(
")
!(
")
!(
")
")
")!(
!(
!(
")
!(
")
")
")!(
")")
")
")
")!( ")
")
!(!( ")
!(
")
")!(
!(")
!(
")
")
!(
")")
")
")
")
") ")
")
!(
")
!(
!(
!(
")
!(") ")
")
!(
")
!(
")
!(")
")
")
") ")")
!(")
!(
")")
!(
")
")!(
!(
!(
!(
!(
!(
!(")
")
")
!(
!( ")!(
!(
") ")
")
!(
!(
")
!(
!(
!(
")
!(
")")")!(
") ")
")
!(
")
!( ")
!(")
") !(
")
!(
!(
")
!(
")
!(
")
")
!(
!(
!(
!(
!(
!(
")
!(
!(
!(
")
")
")
")
!(
")
!(
")
!(
!(
")
")
!(
")
!(") ")
!(
!(")
")
!(
!(
")
")
")
!(
")!(")
!(
")!(
")
!(
!(
!(
!(
")
!(
!(
")
!(
")
")
!(")
!(
!(
")
")
!(
")
!(
")")
!(
")
!(
!(
!(
")
")
!(
!(
")
!(")")!(
")
")
")
!(
")")
!(
")
")
!(
")
")
!(
")
")")
!(
")
")
!(
")
!(
")
")
!(")
")
!(
") ")
")
")
")
!(
!(
!(
")
")")
")
")
")
")
!(
!(
!(
")
")
")
")
!( ")
")
")!(
!(
")!(
!(
!(
")")
!(
!(
!(
!(
!(
")
!(
")
!( ")
!(
")
!(
!(
")
")
")!(
!(
")
!(
")
")
")
")
")
")
!(")
!(
!(
!(!(
")
!(!(
!(
")")
!(
!(
!( !(
")!(
!(
!(
!(
!( !(
!(
!( ")!( !(
")
!(
")
")
")
")
")
")!(
!(
!(
")
")
")
")
!(
!(
!(
!(
!( !(
")
")
!(
")
!(
!(
!(
!(
!(
!(
!(
")")!(
")")")")
")")!(
")")
")")")")")!(") ")")")")
")")
")")
")")
!(
")")
")")!( ")")")
")")!(
!(")")
")")!(
")")!(
")") ")")!(!(
")")")!(
")")
!(!(
!(") ")!(!(")
")")")")")!(!(!(")")!(!(!( !(!(!( !(!( !(
!(!(")")")")!(!(
")") !(
")")!(!(
!(
!(
!(")")!( ")")
")")")!(!(!(
!(
!(")") ")") ") ")")!(
")")")
")")
!(
")")")!(")")!(!(
")")
")")
")
")")
")")!(!(")")")")!(
")
!(
")")!( ")!(") ")!( !(!(")
")")")")!(")")!(")
")")")
")")
")")!(
!(!( !( !(")")
!( !(")") ")!(
") ")!(!(
")")")!(!(
!(!(
")")!( !(
!(
!( ")")!(
")")!(
")
")
")
")
")!(
!(!(")")
")")
")")")
!(
!(
!(
")")!(
")") ")") !( !(
")")!(
!( !(
")")")!(
!(
!(
!(
")")!(
")")!(!(")
")")")!(
!(
")")
")
!(
!(
")")")!(!(!(!(!(
")
")
")")!( ")")!(
")")")")!( ")")!( ")")")")
!(")
!(
!(
")")
")")
!(
!(
")")
")!(!(
!(!(
!(!(!(
")!(!(
")")!(
")")!(
")")!(!(
!(")")!(
")")
")")
!(
!(
")")!(
")")!(
!(
")") ")
")
")")
!(
!(
")")!(
!(")
!(!(")")")!(
!(
!(")")
!(")
")!(
")")")")!(")")
")
!(
!(!(
!(")
")")
")")!(
")")!(
!(")
")")!(
")!(
!(
")")
")")")!(!(
!(
!(")
")")")!(!(
!(")")
!(
!(
!(!(")")")")
!(")
")")!(!(!(")
")!( !(!(")")
!(")
")")
")")
")")
")")
!(
!(
")")!(
!(
!( !(
!(")")
")")")
!(
!(")") ")")")")
") ")
")
")")!(
!(")")
")")
!(
")
")
!(
")")!(
")")!(
")")!(
")")!(
!(")")
")")")!(!(
!(
")")")!(!(
")")!(
")")!(
!(
")")
")")!(
!(
")!(
")")!(
")")!(
")")!(
")")
")")
")!(!(!(")")")")")")
!(
")")
")")")!(
")")")!(
!(
")")")!(!(
")")
")")
")!(
")")
")")
")")
")")")")
!(
")")!(
")")")!(
")")")
")")")!( ")")
")")")")")!( !(
")")") ")")!(
")")!(!(
") !(
")
!(!(
!(
")") ")") !(
")")
")")
")")
")")!(
")")
")")!(
")")
")")!(!(
")")!(
")")!(
")")
")")")!( !(
!(
")")
")")!(!(!(
")")
")")
")")
!(
")")
!(
!(!(!(")")
")")
")")!(
")")
!( ")")
")")
!(
")")!(")")!(
!(")")")
")")
")")!(!(
")")
!(
")")!( !(
!(")")
")") ")
")")
")")
")")!(
!(
")")
!(
!(!(")!(
")!(
!(
!( !(")
")") ")!(
")")!(!(!(
!(")")")!(
!(
")")!(
")")")")!(
!(
")") ")")!(
")")!( ")")
")")
")
")")!(!(
")")!( !(
")")")")!(
")")
")")!(
")")
")")
!(
!( !(")")")
!(
")")") ") ")")") !( !(
")")
")")
")
")")
")")
")")
")")
")")
")")
!( ")")!(
")")
")")
!(
")")
!( ")")!(
")") ")")")
")!(
!(
!(
")")
!(
")")")") !(!(
!( ")") !(!(
")") ")
") ")")
")")")")
") ")")")
")") ")")
")") ")")
")")
")")
")")
!(
!(!(
!(!(
!(
!(
!(!(
")")")")
")")")")!(
!(
!(
!(!(
")")")")
")") ")")
")")")")
")")")")
")")
")")")
")")
!(
!(
!(!(
!(!(!(!(
!(!(!(
")")
")")
")")")
")")")
!(
!(
!(
!(
!(
")
")")")
")")
!(
!(
!(!(
!(!(")")
")")
")")
")")")")
")")!(!(!(
!(
!(!(
!(
!(!(
")") ")")")")") ")")")") ")")")")
")")")") ")
")")
")")
")")")")")
!(!(
!(!( !( !(!( !(!(
!(")")
!( !( !(
")")")")
")")
")")
") ")") ")")!(!( !(!( !( !( !( !(")
")")
")")
!(
!(
")")
!(
")")
")")!(
!(
!(
")")!(
")") ")")
")")
")
")
")")")")
!(
!(
!(
")")
")")
")")
")")!( !( !(
!(
!(
!(
!(
!(
!(")")
")")
")
")")
!(
") ")
")")
")")
")
")")")") ")") !( !( !(
")")
")")
")")
!(
!(!(")
")") ")") !( !(
!(
!(")")")
")")!(
") ")")
")")
")")!(
!( !(!(
!(
!(")")
")")!(!(!(
!(")")")
")")
")
")")
!(
!(
!(
")")
")")
!(
")")
!(!( !(")")
")")!(
")
") ")")")!(!(
")")!(
")")")
")")")
!(
!(
!(
!( !(")")
")")")") ")")!(
")!(
")")")
")")
")")
")")
")") ")")
")")
")
")
") ")")")") !(")
")
")")
")
!( !(
!(
!( ")")
!( !( !(!( ")")
")")")
")")")
")")") ")")
")")
!(!(
!( !(
!(")")")!(
!(
!(!(!(!(
!(
!(
!(!(!(!( !(
!(
")") ") ")")
")") ")
")")")")")
")")")")
")")
")!( ")")!(")")")")")")")
")")")")") ")")")
")")
")")
")")")")
") ")")")")")")") ")") ")")
!(
!(
!(!(
!(!(
!(
!(!(!(
!(
!(
!(
!(") !(!( !(!( !(
")")
!(!(!(!(
!(!(!(
!(!(!(!(
!(")")")")")") !( !(!( !( !(
!(!(
!(!(
")")
") ")
!(
!(")")
!( !( !( !(!(!(!( !( !(!(
!(
!(")")
") ") ")") ")")")!(
")")")!(!(!( ")")")")") ")")
")
")")
")
!(
!(!(
!(!(!(
!(
!( !(
!(
")
")")")")
")")")")")")
")")
")
!(
!(!(!(!(
!( !(
!(
")")
")
!(
!(
!(
!(
!(
")
")")
")")")
")")")
")") ")") ")
")")
")")
")")")
!(
!(
!(
!(
!(
!(
!(
!(!(")")")")
!(")")
!(!(
!(!(!(
")")")
")")
")")")") ")")
")")
")")")!(
!(
!(
!(
!(
!(
!(
")") ")") ")") ") ")")") ")")") ")")") !( !( !( !( !(
")")")") ")")") ") ")")")") ")")")") !(!( !(!( !( !(!( !( !( !(")") ")")")")
!(
!( !( !( !(")") ")") ") ")")!(!(
")")!(") ")")!(
!(
")")
")") ")")
")")
")
")")
")")")
!(
!(
!( !(
!( !( !(
")")")
")")")")
")")")") ")
")")")")
")")
")")!(
!(
!( !(
!(!(
")
")")")
")")")")")") ")") ")")
!(
!(!(!(
!(!(!(!(!( ")")")")")")")")!(!(!(!(
!(")")
")")") ")") !(!(!(!(
!(!(")")")")
")")") ")")")
") ") ")
")")
")
")")
")
")")
")")
!( !( !( !( !( !(!(!(
!(
")")")!(
!(!(!(
!(!(
!(!(
")")")
")")")")
")")!(
!(!(
!(
!(
!(
!(!(
!(!(
!(")")
")")")")
")")
")")
")")
!(
!(
!(
!(
!(
!(
")
")
")
")
")")
")")
")")
!(
!(
!(!(!(
!(
!(!(
!(!( ")")!(")")!(
")
")")")")
")")!(
")")")")!( !( !(
!(!(")") ") ")
")")")")!(
!(
!(
")")
")")")
!( ")")!(!(
")")")") !(!(
")")
")")")
")")
")")") !(
!( !(
!(!(")
!(!(!(")")")!(
")") ")")")")!(
")")")")
")")
!(!(
!(!(!(!(")")!( !(!(
")")")
")
") ")")
!(!(
!(!(!(!(
")!(!( !(
!( !(!(")")")")")!(
!(
!(
!(")")
")")")
!(!(")") ")") ")") ")")")")!(!( !(!(!(
!(
")")")!(
")") ")") ")")")
")")
")")")")")")
!( !(!(!( !( !(
!(!(!( !(!(!(
")")")
")")")")
")")")")!(
!(!(!(
")")")")")
!(
!(
!(!( !(
")") ")")!(!( !( !( ")")!(
")") ")")!(!(
")")!(
")")")") ")")
")")")")")") !(!(
")")")
")")") ")")")") ")") ")")!(!(!(!( !( !( !(!(
")")")")")!( ")")")") ")") !(!( !(
")")
")") ")")
")")!(!(
!( !(!(!(
!(")")")!(!(
!(
!(
")
!(
!( !(
!(
!(
!(
")
!(
!(
!(
!(
")
Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), MapmyIndia, © OpenStreetMap contributors, and the GIS User Community
Legend
Drainage Structures
<all other values>
STRUCTURE_TYPE
") Catch Basin
!( Culvert
!( Drywell
Large Structural BMP
!( Manhole
!( Outfall
Pump Station
Structure
Unknown
Drainage Pipes
!(
Proposed Tidal Valve Locations
Oceanside Boundary
0 820 1,640410
Feet
During several coastal storms, including Hurricane Irene, Tropical Storm Lee and Superstorm Sandy, many communities
along the south shore of Long Island were subject to severe flooding due to high tides and heavy rain. Existing drainage
infrastructure was completely overwhelmed, which resulted in the inundation of roadways, homes, schools, municipal
buildings and businesses.
The development of a comprehensive analysis for the Oceanside
hamlet was identified as a project as part of the NY Rising
Community Reconstruction (NYRCR) Program within the
Governor’s Office of Storm Recovery (GOSR). These plans
outlined numerous projects to help rebuild more resilient
communities in response to the severe storm damage.
H2M staff performed hydrologic and hydraulic evaluations for
the drainage systems within the 3,000 acre study area to assess
the abilities of these systems to convey runoff from the tributary
watersheds. Computer modeling was utilized to calculate
peak runoff rates for various storm frequencies. Based on the
results of the computer modeling, we were able to recommend
improvements to existing infrastructure to alleviate flooding
during storm events, including increasing pipe capacity, installing
pump stations, raising road elevations and developing green
infrastructure techniques to improve water quality.
SEIFFERT COURT
REPLACE 850 LF OF EXISTING 24" DIA. PIPE WITH 36" DIA.
PIPE BETWEEN SEIFFERT COURT AND OCEANSIDE ROAD
$635,000
RIVER AVENUE & WATERVIEW ROAD
REPLACE/ELEVATE 200 FEET OF BULKHEAD &
REPLACE 200 LF OF 15" DIA. PIPE WITH 18"
DIA. PIPE $300,000
LAWSON BLVD.
NEW 36" IN LINE TIDAL CHECK
VALVE . $60,000
NEW 16,000 GPM STORMWATER
PUMP STATION . $16,000,000
WEIDNER AVENUE
NEW 24" IN LINE TIDAL CHECK
VALVE $53,000
NEW 2,500 GPM STORMWATER
PUMP STATION $2,500,000
CARREL BLVD.
RAISE ROAD 800 FT
APPROXIMATELY 6"
$2,400,000
CARLOU COURT
NEW 1,000 GPM STORMWATER PUMP
STATION $1,000,000
NEW 18" IN LINE TIDAL CHECK VALVE
$48,000
4TH STREET
REPLACE 1,400 LF OF 24" DIA.
PIPE WITH 36" DIA. PIPE
$1,000,000
BENJAMIN ROAD
NEW IN LINE 36" TIDAL CHECK
VALVE $60,000
NEW 81,000 GPM STORM WATER
PUMP STATION $81,000,000
DERBY DRIVE
REPLACE 200 LF 18" DIA. PIPE
WITH 24" DIA. PIPE $80,000
DERBY DRIVE
REPLACE 200 LF 15" DIA. PIPE
WITH 18" DIA. PIPE $75,000
STANTON PLACE, LOUIS PLACE
AND MORELAND AVE.
RAISE ROAD, 12" $1,700,000
BEVERLY ROAD / STANLEY PLACE
REPLACE 36" OUT FALL PIPE SOUTH
OF TINKER DR. LOWER OUTFALL
PIPE AND DRAINAGE DITCH $620,000
LAWSON BLVD.
REPLACE 900 LF OF
DRAINAGE PIPE . $450,000 MOORE AVE. / FULTON AVE.
INSTALL 2,000 LF
HORIZONTAL LEACHING
CHAMBERS, ALONG MOORE
AVE. $650,000
PERRY AVE.
INSTALL ADDITIONAL INLETS
$170,000
LINDBERGH AVE.
NEW 8,000 GPM STORMWATER PUMP
STATION $8,400,000
INCREASE PIPE CAPACITY. $80,000
NEW 18" IN LINE TIDAL CHECK VALVE
$48,000
LAWRENCE AVE.
CLEAN DEBRIS
FROM PIPE $40,000
LAWRENCE AVENUE
NEW 79,000 GPM STORM
WATER PUMP STATION
$79,000,000
NEW IN LINE 42" TIDAL CHECK
VALVE AT OUTFALL ON DALY
BLVD. $66,000
ROYAL AVENUE
RAISE ROAD 6" $550,000
HAMPTON ROAD
INSTALL ADDITIONAL INLETS
AT LOW POINTS $170,000
OCEANSIDE DRAINAGE IMPROVEMENT PLAN
RECOMMENDED IMPROVEMENTS AND COSTS
4TH ST. & 5TH ST.
NEW IN LINE 48" TIDAL CHECK
VALVE ON OUTFALL PIPE AT
WAUKENA AVE. $70,000
NEW 44,000 GPM STORM
WATER PUMP STATION
$44,000,000
EVANS AVE.
NEW 30,000 GPM STORMWATER
PUMP STATION $30,000,000
NEW INLINE 42" TIDAL CHECK
VALVE ON OUTFALL PIPE AT
WEST WAUKENA AVE. $66,000
LAWSON BLVD.
RAISE INTERSECTION
AT WEIDNER AVE.
$4,000,000Page 442
Pump Station Upgrades • Town of Huntington Huntington, NY SERVICES PROVIDED Civil Engineering Electrical Engineering Construction Administration Construction Cost: $100,000 H2M was retained by the Town of Huntington Highway Department to provide engineering services for the replacement of the submersible pump and control panel at Recharge Basin 376. The existing submersible pump at the recharge basin pump station had reached the end of its service life and was no longer operational. The pump station itself, with a history spanning over four decades, featured an eight-foot-diameter-by-23-foot-deep concrete wet well. The pump is designed to transfer stormwater from Recharge Basin 376 to a drainage manhole located upstream of Drainage Basin 408 whenever water levels in Basin 376 become elevated and pose a risk of localized flooding. After reviewing available plans and topographic data, H2M prepared hydraulic calculations to select a new pump. The pump was procured through a Suffolk County contract, which streamlined the purchasing process and significantly reduced the lead time compared to traditional bidding practices. Installation of the pump was completed by one of the Town’s on-call contractors, further expediting the project schedule. During the scheduled start-up of the newly installed pump, it was discovered that the existing pump control panel was also inoperable. This necessitated the preparation of additional specifications for a new pump control panel, which was installed by the Town’s on-call instrumentation and control contractor. As a result of the project, the pump station is now equipped with a new submersible pump and a modern control panel, improving reliability and efficiency.
Page 443
Roadway Reconstruction • Township of Parsippany - Troy Hills Parsippany, NJ SERVICES PROVIDED Civil Engineering Roadway Design Land Surveying Construction Documents Construction Cost: $19,400 H2M performed surveying and engineering services for the milling and resurfacing of approximately 3,200 linear feet of roadway. As part of the Township of Parsippany’s annual program for roadway improvements, H2M was selected to perform surveying and engineering services for the milling and resurfacing of approximately 3,200 linear feet of Waterview Boulevard from Route 46 to Parsippany Boulevard. In addition to the milling and resurfacing, new concrete sidewalks were installed on the south side of the roadway with mid-block crossings being introduced in several locations. Selective removal and replacement of existing curb and sidewalk, replacing of inlet castings, base repair, and the construction of new handicap ramps were also part of the project. The project plans and specifications were prepared in accordance with New Jersey public bidding requirements and all technical specifications were in accordance with New Jersey Department of Transportation (NJDOT) format.
Page 444
Road and Drainage Improvements • Township of Pequannock Pequannock, NJ SERVICES PROVIDED Drainage Design Curb Design Roadway Design Construction Inspection Construction Cost: $1.6 million Due to a deteriorated road condition, and poor condition of the existing drainage infrastructure, we recommended that the Township rebuild the entire Village Area roadway. Approximately 12,000 linear feet of roadway were rebuilt, 23,000 linear feet of deteriorated concrete curb was replaced, and drainage improvements were constructed in a residential area. The utilities of the residential “village” neighborhood in Pequannock were recently upgraded, including new sanitary sewers, new water mains, and new gas mains. The magnitude of this utility work left the roadway in a deteriorated condition. In addition, the generally flat topography and poor condition of existing drainage infrastructure left the area susceptible to flooding. Therefore, at our recommendation, the Township decided to rebuild the entire roadway to make changes to the roadway alignment, and construct additional drainage infrastructure. This work restored the character of the neighborhood and gave it a bright appearance. The existing roads were very flat (below recommended minimums) and the spacing between the catch basins was far. To improve drainage, the vertical alignment of the road was changed to increase the road grade to the minimum recommended standards for residential areas. To limit the effects to adjoining properties, additional high and low points were added to the roads to maintain the average elevation. Additional seepage-type catch basins and perforated overflow piping were added at the low spots to improve drainage. In addition to the existing substandard grades, the project streets had irregular roadway widths and wide intersections. Changes to the horizontal alignment were made to create a uniform roadway width and improve control at the intersections. Additionally, the driveways and front yards were close to the same elevation as the existing roads and the project streets were narrow. Mountable granite block curb was chosen as the new curb material to match the existing residential properties better and to better accommodate vehicles on the narrow roads. The reconstruction of the roads was accomplished through a process of roadway reclamation with an asphalt overlay. The entire roadway base was milled, stabilized, and rolled smooth to provide a compact roadway base. A layer of asphalt was then constructed over the compact base to provide a durable roadway. Several construction crews worked to complete the project. Extensive coordination was required for traffic access, as the “village” neighborhood has limited access into the development. Additionally, our construction inspection team communicated effectively with residents on a daily basis.
Page 445
Roadway Reconstruction and Tree Mitigation • Inc. Village of Bellerose Bellerose, NY SERVICES PROVIDED Roadway Design Tree Mitigation Construction Cost: N/A H2M’s Civil Engineers were tasked with designing the full replacement of pavement and curbs for various streets in Bellerose, NY. After receiving a grant from New York State, the small Village of Bellerose elected to commence with a roadway improvement program for the first time in over 50 years. With no experience managing such a large project, the Village asked H2M for assistance. Initially, H2M assessed the condition of the pavement throughout the entire Village and prioritized several roads that could be completed within their budget. Ultimately, portions of Hudson Road and Ontario Road were selected for reconstruction. Neither road included a proper aggregate base and curbs were sporadic and of random construction. As a result, full replacement of pavement and curbs on each street was warranted. These roads were also wider than most residential streets, so H2M recommended reducing the width of each street to reduce the quantity of storm water runoff and also reduce the impact to numerous large trees that might otherwise have required removal due to the construction of new curbs. The completed project required removal of only three trees out of the 109 throughout the project limits in order to maintain proper flow of storm water along the new curb and gutter.
Page 446
Roadway Improvements • Incorporated Village of Hempstead Hempstead, NY SERVICES PROVIDED Construction Administration Construction Inspection Roadway & Roundabout Design Site Grading & Drainage Traffic Signal Design Construction Cost: $6.4 million H2M designed realignments and other roadway improvements for the Incorporated Village of Hempstead in Nassau County, NY. The Incorporated Village of Hempstead intended to resurface several roads as part of the Village’s 2024 road improvements program. The roads presented substandard driving conditions, including flat slopes that resulted in ponding. The Village hired H2M to design improvements to approximately 20,000 linear feet of residential roads of widths between 25 and 45 feet. H2M designed the realignment of the roads with higher slopers to address ponding, as well as rebuilt curbs and sidewalks to match the alignment. Additionally, at the request of the Village, H2M included rubber speed humps as traffic calming devices at various locations throughout the project. H2M’s construction documents for the roadway improvements were completed on time and under budget.
Page 447
Parking Lot Improvements • Inc. Village of Hempstead Hempstead, NY SERVICES PROVIDED Survey Inspection Civil Engineering Construction Cost: $630,000 The Village of Hempstead contacted H2M to design the improvements to a municipal parking field. At first, the scope seemed very straightforward. However, this parking field not only provided parking for local businesses, it also served Village Hall, the Village Police Department, and the local library. The library provides many programs for young children and the elderly and the police station needed to maintain operations during construction. Therefore, maintaining safe access to both facilities during construction was critical. Since the project scope included replacement of the entrance to the police station to provide ADA accessibility, alternate means of ingress and egress were necessary. The project scope posed an extensive disruption to the normal operations of Village Hall, library, and police station. To minimize the disruption, careful coordination with each entity was necessary during design to develop alternate means of access and ensure that daily operations were not affected. The project included the installation of a remote payment system for a portion of the parking field that provided parking for the local commercial district, which needed to integrate with the existing web-based system currently in use by the Village. Additional drainage facilities were installed to address nuisance flooding of the site.
Page 448
Drainage & Athletic Improvements • Incorporated Village of Malverne Malverne, NY SERVICES PROVIDED Athletic Field Design Civil Engineering Construction Administration Construction Inspection Landscape Architecture Site Conditioning and Drainage Wetlands Mitigation Planting Construction Cost: $6.5 million The Village of Malverne hired H2M to design drainage improvements and renovations to Whelan Field and improve public access to Pine Stream. Whelan Field is a 5.72-acre public park featuring two baseball fields, a smaller one for the Malverne Little League players and a larger one for pre-teens and teenagers. The fields sit near Pine Stream, a small tributary which connects to Mill River. The primary goal of the project was to construct additional floodplain storage for Pine Stream and install on-site stormwater detention to collect and treat runoff before it entered Pine Stream with funding from the New York State Office of Resilient Homes and Communities. To construct these improvements, the entire site, including both baseball fields, needed replacement. The Village leveraged this opportunity to improve the baseball fields and provide other enhancements to the park After constructing the drainage improvements, H2M renovated both baseball fields, expanding the size of the larger field to meet the standard dimensions of high school baseball fields. The existing batting cages were also expanded, and new dugouts were designed with shade canopies to shield players from direct sunlight. The existing spectator stands were replaced with new seating and custom stone block terraces were designed for the outfield bleachers at the larger baseball field. H2M enhanced the wetlands buffers around Pine Stream by establishing native riparian plantings in place of the existing invasive vegetation, and created openings in the buffer at several locations to provide scenic views and physical access to the stream. H2M also designed a new paved parking lot and pathway system to provide universal access throughout the park. Fitness stations and educational signage, pedestrian lighting, and benches are placed along these new pathways. The design also features a new 20’ x 30’ open air pavilion overlooking a new and expanded dog run prioritized for large and small dogs. AWARDS ♦ ACEC Diamond Award
Page 449
Streetscape Enhancements • Inc. Village of Westhampton Beach Westhampton Beach, NY SERVICES PROVIDED Landscape Architecture Civil Engineering Drainage Improvements Pedestrian Safety Features Electrical Engineering Bid Support Construction Cost: $12.2 million The pavement, sidewalk, and drainage systems on Main Street in Westhampton Beach had reached the end of their useful life. In turn, the Village requested H2M replace the systems with potential stormwater quality improvements, removal of overhead utility wires, and improved pedestrian safety features leading to the overall enhancement of Main Street. H2M led the design for the reconstruction of approximately 2,700 feet of roadway and sidewalks that required replacement on Main Street between Potunk Lane and Beach Lane. The roadway width was reduced to 60 feet, with 12-foot-wide travel lanes in each direction and double-sided on-street angled parking. The new roadway profile has resulted in wider, safer sidewalks with bulb-outs at major intersections reducing pedestrian crosswalk distances. Two planted rotaries move traffic efficiently and mark the gateway and terminus of the Main Street corridor. In addition to roadway improvements, this project included a full replacement of the existing drainage system. The existing clay pipe system had been overrun with breakages and tree root intrusions. This reduced capacity of the existing drainage system was causing the Moniebogue Canal to become polluted with surface runoff. H2M designed a plan for the complete replacement of the existing drainage system, with a hydrodynamic separator, which would help reduce pollution in the Moniebogue Canal. Permeable pavers were placed in the utility strip, and hydrodynamic vortex separators were also included. Structural soil was placed as a high strength, root penetrable base course under pavements around new street tree pits, to support tree root growth and mitigate compaction loads from pavement and pedestrians. Per the Village’s decision to remove overhead utility wires between Mitchell Road and Mill Road, H2M helped coordinate with several utility companies. In addition, H2M’s electrical engineers coordinated closely with PSEG Long Island on the location of approximately 7,200 feet of electrical conduit and 37 pull boxes and transformer concrete pads for primary service within Main Street. The Village’s contractor installed buried structures and conduits for utility use in eliminating the overhead distribution. Removing the overhead utility poles also eliminated the existing attached cobra head light fixtures, the road’s major illumination source. H2M landscape architects and electrical engineers coordinated the lighting replacement with decorative street lighting to provide appropriate illumination for pedestrians on sidewalks and drivers on the roadway. H2M also designed new street plantings, perennial plantings, as well as a passive park plaza featuring distinctive paving, planting, and seating. AWARDS ♦ ACEC-NY Engineering Excellence Platinum Award
Page 450
Pumping Stations Rehabilitation • Westchester County Department of Environmental Facilities Yonkers, NY SERVICES PROVIDED Asbestos Survey Bid Services Collection System Capacity Analysis Construction Administration Construction Inspection Cost Estimates & Opinions Design Engineering Engineering Design & Report Estimating Existing Condition Assessment Facility Evaluation Survey Wastewater Engineering Construction Cost: $17 million The Westchester County Department of Environmental Facilities hired H2M to help rehabilitate the Alexander Street and Irvington Pumping Stations in the North Yonkers Sewer District. The Alexander Street Pumping Station was originally constructed in the 1930s and was last rehabilitated in 1992. The Irvington Pump Station was constructed in 1976 and last saw rehabilitation in 2002. Both were due for an evaluation of existing conditions and rehabilitation. H2M assessed of the condition of each pumping station, including the station’s size, pumping capacity, electrical equipment, HVAC equipment, roofs, stairs, and odor control systems and made recommendations for improvements to meet current design standards. The Alexander Street Pumping Station average daily flow is 1.055 MGD with the peak hourly design flow of 3.09 MGD. The pump station upgrade included a new prefabricated building to house headworks equipment with a separate room for the electrical equipment necessary to support the Alexander Street Pump Station’s electrical independence from the North Yonkers Pump Station. The rehabilitation also involves upgrades to wet well and dry well equipment, including new dry pit submersible pumps, piping and associated valves; sump pump; automatic bar screen; odor control system; and flow/level sensors. H2M assessed the stairs, walkways, gratings, and rehabilitation of the wet well, dry well, and tunnel roofs and made repairs as necessary. H2M’s design also provided adequate lighting and mechanical ventilation in the wet well and dry well. The Irvington Pump Station average daily flow is 1.37 MGD with the peak hourly design flow of 3.86 MGD. The pump station upgrades include adequate lighting and mechanical ventilation throughout the wet well and dry well. H2M’s design included replacement of the stairs, exterior doors, hatches, roof, gutters, and leaders. These new leaders were designed to direct rainwater away from the building and not discharge into the wet well or sanitary sewer. The design also includes repointing/replacement of brick on the control building as necessary; paint exterior metal; and add new asphalt and concrete sidewalks. The existing underground fuel tank for the generator will be abandoned in place. A new 975-gallon aboveground fuel tank will be installed outside adjacent to the dry well, and a new Con Ed 480V electric service will be installed for the pump station.
Page 451
TAB 3
Page 452
► Staffing Plan PROJECT TEAM CIVIL ENGINEERING Luis Osorio, P.E. ELECTRICAL ENGINEERING Charles J. Starke, P.E.* WATER & WASTEWATER ENGINEERING James M. Vierling. P.E.* ADDITIONAL DISCIPLINES (IF NEEDED) Structural Engineering Mechanical Engineering Plumbing/Fire Protection Engineering Environmental Engineering Architecture The successful completion of a project requires a diverse pool of experienced personnel capable of performing tasks within their area of expertise. H2M’s management and project managers are also aware that the success of any project is dependent upon the close cooperation required between the H2M staff and the project personnel of the Town of Granby. The proposed organization of personnel and resources is intended to bring together a team of professionals that can focus on project objectives as well as respond to unanticipated circumstances or issues. * - Licensed in Other States Resumes for the above referenced personnel are provided following this page. PRINCIPAL-IN-CHARGE Gregory J. Levasseur, P.E. Vice President, Windsor Office Director PROJECT MANAGERS Matthew R. Mohlin, P.E. Anthony W. Kim, P.E. Nicholas F. Bono, P.E.* Vice President, Department Manager - Civil Engineering Vice President, Department Manager - Electrical Engineering Vice President, Discipline Director - Water & Wastewater Engineering QA/QC Michael W. Keffer, P.E., LEED AP Senior Vice President, Discipline Director - Civil Engineering 1
Page 453
Education B.S., Civil Engineering; University of Hartford Certificate in Construction Management Licenses/ Certifications Professional Engineer: CT, NY, RI H2M Project Management Training Program Memberships American Society of Civil Engineers (ASCE) Water Environment Federation (WEF) Awards Board of Director Service Award, NYWEA Ones To Watch, NYWEA Mr. Levasseur brings over 20 years of engineering experience to his role as H2M’s Windsor, CT, Office Director. A licensed Professional Engineer and seasoned project leader, he is widely recognized for his technical expertise in wastewater infrastructure, including the planning, design, and contract administration of treatment plants, gravity sewers, low-pressure systems, force mains, and pumping stations. However, his value to clients and project teams extends far beyond his wastewater credentials. As Office Director, Mr. Levasseur plays a pivotal role in the strategic growth and operational leadership of H2M’s Windsor office. He serves as a key client liaison and trusted advisor across a wide range of municipal and infrastructure projects throughout Connecticut. His deep familiarity with the state’s regulatory landscape, municipal priorities, and funding mechanisms allows him to anticipate client needs and guide teams toward practical, cost-effective solutions. Mr. Levasseur is frequently called upon to serve as Principal-in-Charge, Technical Advisor, or QA/QC Lead on multidisciplinary projects—ranging from water main extensions and environmental assessments to zoning regulation updates, brownfield redevelopment, and more. His ability to bridge technical rigor with client-focused delivery makes him an asset on both proposal teams and project execution. His leadership is grounded in responsiveness, accountability, and a commitment to quality. Whether supporting proposal strategy, mentoring junior staff, or representing H2M in client meetings, he brings a steady hand and a collaborative mindset that aligns with the firm’s mission, vision, and values. Gregory J. Levasseur P.E. Vice President, Windsor Office Director
Page 454
• Various School Districts Synthetic Athletic Field Projects; Various Locations, NY: Civil Engineering Project Manager overseeing the replacement of existing grass athletic fields with new synthetic turf football/soccer fields with associated drainage system improvements for the new fields for the school districts of Freeport, Mount Sinai, Hewlett Woodmere, Baldwin, Island Trees, South Huntington, and Smithtown. • Dominican University New Athletic Field; Orangeburg, NY: Design of a new NCAA running track and synthetic turf athletic field, including diversion of a stream and drainage improvements. • Kings Park School District Athletic Field Upgrades and Comfort Station; Kings Park, NY: Project Manager for the replacement of a running track and football field with a new EPDM running track and synthetic turf multi-purpose field at the Kings Park High School. • Locust Valley School District Athletic Field Improvements; Lattingtown, NY: Project Manager to address drainage improvements on the baseball field and softball field at Locust Valley High School. • Carle Place School District Athletic Field Replacement; Carle Place, NY: Project Manager for the replacement of grass football and baseball fields with synthetic turf, including new bleachers, fencing, lighting, and walkways. • Tarrytown School District Athletic Field Upgrades; Sleepy Hollow, NY: Project Manager for the replacement of three multi-purpose athletic fields with synthetic turf and the reconstruction of a baseball infield at Tarrytown High School and Washington Irving Middle School. Both sites included drainage improvements and the preparation of a NOI and SWPPP. • Seminole Tribe of Florida Ball Field Renovations; Immokalee, FL: Working with the Seminole Tribe of Florida in Immokalee to design the renovation of athletic facilities as a subconsultant to LTG Sports Turf One. The project includes renovation of existing facilities: ball field, concession/restroom building, dugouts, press box, and bleachers, as well as the addition of a new north ball field. • Town of North Hempstead Ball Field Park Complex; Port Washington, NY: Project Manager for the development of new athletic fields and park facilities at Manhassett Valley Park. • New York City Housing Authority (NYCHA) New Athletic Field; Bronx, NY: Design of a new, natural grass baseball field and exercise track at Throggs Neck Houses in the Bronx. New site amenities incorporated into the design include equipment storage shed, bleachers, electronic scoreboard, dugouts, and drinking fountain. • Inc. Village of Malverne Drainage Improvements and Baseball Field Renovations; Malverne, NY: Project Manager for drainage improvements and creation of new floodplain storage in a Village park. To increase floodplain storage in the area surrounding Pine Stream, approximately five acres of parkland was re-graded and lowered. This also allowed for two baseball fields to be redeveloped using current design standards. Additional stormwater management controls were included to address stormwater quality and quantity. • Town of Clarkstown New Baseball Field; Clarkstown, NY: Project Manager for the design of a new Little League Field at Germonds Park. The baseball field was designed to accommodate regional championship games for the annual Little League World Series tournament. Education B.S., Civil Engineering; Polytechnic University Licenses/ Certifications Professional Engineer: NY, CT, FL Memberships American Society of Civil Engineers American Public Works Association Honors/Awards American Society of Civil Engineers, Student Chapter, Meritorious Service, 1989 Mr. Mohlin has more than 30 years of civil engineering experience. His responsibilities include the management of all civil engineering design projects. He also served as a project manager for multiple projects that include the analysis and design of roadways, parking lots, paving; site grading; drainage and sanitary systems, flood control systems, parks and recreational facilities, irrigation systems, bulkheads and docks, and the preparation of designs, site plans, specifications, and reports. He is Project Manager on numerous projects, some of which are listed below. Selected project experience Vice President, Civil Engineering Department Manager Matthew R. Mohlin P.E.
Page 455
• Eastport-South Manor Central School District Bond Referendum; Eastport and Manorville, NY: Civil Engineer for the development and execution of a $90 million bond referendum supporting District-wide capital improvements. Led planning, documentation, and community facing materials for upgrades, including District-wide security booths; a 200,000 square foot standing seam metal roof replacement at the High School; new synthetic turf multipurpose, baseball, and softball fields with track improvements; a 7,000 square foot two story High School addition; and extensive interior renovations encompassing a new café, esports room, technology labs, home and careers spaces, makerspaces, STEAM and art rooms, playgrounds, mechanical system upgrades, and ADA compliant toilet room renovations. Following voter approval, supported the program through two construction phases, developing construction documents and providing construction administration for Phase 1. Phase 2 construction is ongoing. • Hudson River Park Trust (HRPT) Sports Field Lighting Upgrades; New York, NY: As part of an on- call contract with the HRPT, providing design and construction administration support services for replacement of the sports field lighting at Hudson River Park Trust’s Pier 40. H2M’s design solution includes the removal of select light poles while others will remain in place. A cluster of new fixtures was designed for the poles that are remaining. Although the total number of fixtures per pole was increased, the overall weight of the new cluster was verified and will not exceed the allowable gravity load of the existing light poles. At the locations where light poles will be removed, the exposed holes will be patched per the structural engineer’s design details. • SUNY Purchase College Visual Arts Classroom Electrical Upgrades; Purchase, NY: Designed the installation of additional electrical wiring devices and equipment in a number of classrooms (~40) in the Visual Arts Building. The classroom electrical device layout was revised to allow for flexibility and multi- functional use of the classrooms. Local electrical distribution systems were reviewed for the necessary powering and circuiting of the additional devices. • SUNY Stony Brook Storage Warehouse Building; Stony Brook, NY: Lead Electrical Engineer for the design of a new warehouse to store dry good and miscellaneous University property. Designing and sizing new electrical service throughout warehouse and lighting, as well as coordinating connection to electrical utilities. • New York Institute of Technology Salt Shed and Site Improvements; Old Westbury, NY: Designed electrical systems for a new pre-engineered salt shed building to accommodate 60 tons of salt and a new pre-engineered canopy over the fuel dispenser island. • Syosset Central School District District-Wide AC Upgrades; Syosset, NY: Electrical Engineer for a $9.3 million effort to provide air conditioning in most classrooms throughout the District, including seven elementary schools, one middle school, and one high school. • City University of New York (CUNY) Lehman College Leonard Lief Library HVAC Upgrades; Bronx, NY: Low Voltage Engineer for a complete interior redesign of the Library. Replaced all light fixtures with LEDs for energy-efficiency; and incorporated stepped dimming, occupancy, and daylight sensors to conserve energy. • Locust Valley School District; Locust Valley, NY: Design of an electrical service upgrade with the replacement of a 2,000 Amp (120/208 Volt) switch board at the Locust Valley High School. The replacement of the switch gear included the coordination and tie-in to the main 2,500 Amp (277/480 Volt) service equipment located in the adjacent Locust Valley Middle School. Design included the phasing and coordination of the electrical shutdown required to be conducted in the High School Building. Generators were provided to specific areas in the building that required power during the shutdown. Education B.S., Electrical Engineering; Polytechnic University Licenses/ Certifications Professional Engineer: NY, NJ, CT, FL, VA Project Management Training Program, H2M H2M Mentoring Program Graduate, Mentee Mr. Kim is an electrical engineer with more than 15 years of experience. His responsibilities include the design of power distribution, new electrical services and service upgrades, emergency generators and systems, electric vehicle (EV) charging systems, interior and exterior lighting, fire alarm systems, CCTV and access control systems, and security alarm systems. He is also involved in shop drawing review and construction phase services. Mr. Kim is proficient in Revit MEP and has developed the electrical portion of the building information models (BIM) for key projects. Selected project experience Vice President, Department Manager - Electrical Engineering Anthony W. Kim P.E.
Page 456
• Nassau County DPW Bay Park Sewage Treatment Plant Permanent Hot/Chilled Water Piping System; East Rockaway, NY: As Project Manager, led the design team’s progress by the plumbing, mechanical, civil, electrical, and structural disciplines. The purpose of this project is to provide new site hot and chilled water piping systems which provide heating and cooling to the numerous plant operations and treatment buildings on site. The existing piping has experienced failures over the years and temporary repairs have been constructed. A completely new system of piping would be provided to allow for the demolition of the existing. The project involved a detailed re-evaluation of the 30% preliminary design approach due to all the other projects that had been initiated at the Bay Park Facility since the 30% design was completed by the owner. The preliminary disinfection concept was no longer feasible, and a new hot/chilled water piping routing was established by H2M during this course of this project. • Nassau County DPW Glen Cove Wastewater Treatment Plant Settling Tank Improvements; Glen Cove, NY: Senior Project Engineer for the design and construction administration of the primary and secondary settling tank improvement project at the Glen Cove Wastewater Treatment Plant. Responsible for coordinating the preparation of detailed design plans and specifications for the complete replacement of the secondary settling tanks, rehabilitation of the primary settling tank clarifiers, replacement of the primary settling tank clarifier drives and complete replacement of the primary forward flow 24-inch diameter isolation plug valves located in the basement of the Plant headworks building. The design tasks specifically included the preparation of a technical design report, refined project construction cost opinions throughout the duration of the design, a PLA feasibility study, evaluation of existing facility record document information and use of laser scan survey information to prepare accurate design documents. Also responsible for the review and comment of all technical shop drawing submissions during the construction phase of the project and coordination with the client’s construction manager. Provided recurring project updates to the client at monthly progress meetings throughout the duration of design and construction. • Nassau County DPW Glen Cove Wastewater Treatment Plant Sludge Dewatering Improvements; Glen Cove, NY: Senior Project Engineer for the design of sludge dewatering facility improvements at the Glen Cove Wastewater Treatment Plant. Responsible for the coordination of detailed design plans and specifications for the demolition, rehabilitation and process improvements to the existing abandoned DAF building located at the Plant. Design tasks included detailed evaluation of new process equipment and coordination with equipment manufacturer’s to include the re-use and reassembly of existing client-owned belt filter press dewatering equipment from the Bay Park Sewage Treatment Plant to the Glen Cove Wastewater Treatment Plant. Responsible for the preparation of a technical design report, refined project construction cost opinions throughout the duration of the design, a PLA feasibility study, evaluation of existing record document information for the abandoned DAF building and existing belt filter press equipment. Also responsible for the review and comment of all technical shop drawing submissions during the construction phase of the project and coordination with the client’s construction manager. Providing recurring project updates to the client at monthly progress meetings throughout the duration of the project. • Suffolk County DPW Sewer Capacity Study; Suffolk County, NY: As Project Engineer, evaluated all seven areas of interest for sanitary sewer collection, conveyance and treatment systems. Identified nearby existing treatment facilities with close proximity to each area as well as vacant/municipal owned land in the vicinity of each area and determined the most feasible treatment option based on available capacity, complexity and associated costs. Determined the most feasible collection and conveyance system Education B.S., Environmental Engineering; State University of New York at Buffalo Licenses/ Certifications Professional Engineer: NY, NJ Project Management Training Program, H2M Memberships Water Environment Federation Mr. Bono has more than 20 years of experience. His responsibilities include engineering design and preparation of bid ready plans and specifications, contract administration/inspection services and project management and subconsultant coordination on sanitary wastewater projects consisting of gravity sewer collection systems, low pressure sewer collection systems, pumping stations, force mains and sanitary treatment systems. Mr. Bono is also experienced in the preparation of engineering feasibility studies, map and plans and engineering design reports to establish new sewer districts and identify potential out-of-district connections to existing sewer districts to improve environmental, economic and social conditions in un-sewered areas. Selected project experience Vice President, Discipline Director - Water & Wastewater Engineering Nicholas F. Bono P.E. layouts based on the accepted treatment facility location and prepared overall project cost opinions. Projected project phasing plans and schedules and evaluated cost impacts to “typical” property owners to assist in the economic analysis portion of the sewer capacity analysis. Attended public meetings with stakeholders to present the findings of the study, field questions and incorporate the needs of the community stakeholders into the final findings reports.
Page 457
• Village of Westhampton Beach Main Street Improvements; Westhampton Beach, NY: Engineer of Record overseeing the engineering design and reconstruction of approximately 2,700 feet of the Village’s Main Street corridor, including replacement of all drainage, pavement, curbs, sidewalks, street lighting, and street trees and the inclusion of traffic calming features. This project involved extensive coordination with utility companies to facilitate the conversion of all overhead utilities to underground. The design included permeable pavers to reduce stormwater runoff and a stormwater treatment structure upstream of a drainage outfall discharging to surface waters for stormwater quality purposes. • 174 Power Global Battery Energy Storage System Development; Queens, NY: Project Manager for a 100 MW battery energy storage project in New York City for 174 Power Global. Overseeing the interconnection of a 100 MW battery energy storage facility to a 138kV transmission system. As the Engineer of Record, assisted the developer in assembling existing subsurface utility mapping within the interconnect corridor, evaluating existing vertical and horizontal constraints, planning the alignment of the interconnect, coordinating with the construction team on staging work, and overseeing the preparation of construction documents. • Catholic Health Systems St. Joseph Hospital Major Modernization; Bethpage, NY: Project Manager for engineering services associated with the modernization of St. Joseph Hospital. Responsible for land surveying, civil/site engineering, site electrical and plumbing engineering, landscape architecture, SEQRA support, and Environmental Site Assessments (ESAs) Phase I and II. • Bethpage Golf Group Driving Range Improvements; Bethpage, NY: Project Manager responsible for site plan design services associated with the driving range improvements. Designed site features, grading, and drainage as needed to facilitate upgrades. • PSEG Long Island FEMA Hazard Mitigation Program; Long Island, NY: Permitting Technical Advisor responsible for providing technical guidance and information to design engineers preparing highway work permit applications to State, County, Town, and Village officials for underground electrical work within the public right-of-way. Conducted meetings with New York State Department of Transportation (NYSDOT) officials in presenting proposed underground circuits and facilitating approval of PERM32 permits. • New York State Office of Parks, Recreation and Historic Preservation (NYSOPRHP) Hempstead Lake State Park Environmental Education and Resiliency Center and Park Enhancements; West Hempstead, NY: Engineer of Record for the site engineering design for the Environmental Education and Resiliency Visitor Center at Hempstead Lake State Park. This project was part of the Governor’s Office of Storm Recovery’s Living with the Bay project. The site was designed with a stormwater detention system to ensure enhanced stormwater quality prior to runoff reaching Hempstead Lake. Expanded parking and ADA access between the parking lot, Education Center, and access to lake trails and waterfront amenities were included in the site design. Landscaping includes native vegetation and low maintenance species. A sanitary sewage pumping station was designed to route all sanitary flow to an existing collection system and existing treatment facility. Education M.A., Public Administration; George Mason University B.S., Civil Engineering; Virginia Tech Licenses/ Certifications Professional Engineer: NY, NJ, CT, FL, MA, PA, VA LEED Accredited Professional, USGBC Dale Carnegie Leadership Training for Managers Professional Liability Education Program, DPIC PSMJ A/E/C Project Management Bootcamp Designated Plans Examiner Memberships American Society of Civil Engineers Presentations Best Practices for a Successful NYSDEC Audit of a Village MS4 Stormwater Program, Nassau County Village Officials Association, October 2012 Mr. Keffer is a professional engineer with more than 38 years of civil engineering and land development experience. As Director of the Civil Engineering Division, he manages the civil engineering, land surveying, landscape architecture, environmental planning, and GIS practice areas within H2M. Mr. Keffer is also involved in site development projects, site plans, municipal approvals, regulatory permitting, public hearing testimony, through construction administration. He works on a variety of private and public projects including commercial, residential, retail, municipal, hotel, fire and K-12 facilities. He coordinates the efforts of all involved disciplines, engineering design staff, and oversees project budgets and schedules. Mr. Keffer also assists as Village Engineer in the communities of Bayville and Great Neck. In this role, he provides the technical review on site development applications for Village Boards’ of Trustees, Planning Board, and Zoning Board. In addition, he represents these Boards as Village Engineer during public hearings. Selected project experience Senior Vice President, Discipline Director - Civil Engineering Michael W. Keffer P.E., LEED AP
Page 458
Education B.S., Civil Engineering; University of Javeriana, Colombia Licenses/ Certifications Professional Engineer: NY, CT, FL Luis Osorio P.E. Discipline Engineer - Civil Engineering Mr. Osorio is a professional engineer with more than 20 years of experience in the design and management of civil engineering projects on Long Island and in New York City. His experience includes roadway, drainage, and site and recreational facility projects. Mr. Osorio is proficient in Oracle Primavera, Procore, MicroStation, StormCAD, InRoads, Bluebeam Revu, Smartsheet, Microsoft Office, SewerGems, and SpecLink. Selected project experience • Town of Oyster Bay Construction of Pickleball Courts; Massapequa, Farmingdale, and Woodbury, NY: Project Manager/Senior Civil Engineer for the design of pickleball court facilities at Field of Dreams Park, Allen Park, and Syosset-Woodbury Community Park. Work included grading, drainage and site design, construction drawings, cost opinions, and project specifications. • Town of Oyster Bay Construction of Pickleball Courts at B-21; Bethpage, NY: Project Manager/Senior Civil Engineer/Construction Manager for the construction of three Pickleball Courts at the Parklet on Lenox Avenue in Bethpage. Project included construction of new base and asphalt surface, court appurtenances, coating, and fence improvements. • Town of Oyster Bay Reconstruction and Repair of Tennis Courts; Oyster Bay, NY: Project Manager/ Senior Civil Engineer/Construction Manager for the reconstruction of 18 outdoor tennis courts located at various Town of Oyster Bay parks. The project consisted of studying the existing conditions and formulation of different approaches for court rehabilitation. Construction included tennis court base stabilization, asphalt resurfacing, access repairs, coating, and more than 4,500 linear feet of crack repairs. • Sportime Tennis Facility Renovation; Randall’s Island, NY: Senior Civil Engineer for the renovation of the Sportime Facility at Randall’s Island. Responsible for site and utility improvements and grading design. The work included the alteration and addition of four new courts to the existing facilities, new construction of an indoor tennis building with a battery of six courts and four new outdoor U-10 courts. • United States Tennis Association (USTA) Tennis Courts Reconstruction; Corona, NY: Senior Engineer for the civil design to renovate 12 public tennis courts in Flushing Meadow-Corona park. Work for this $1.2 million project included new wet utilities, pavement design, storm water treatment, and site appurtenances. • USTA Billie Jean King National Tennis Center Renovation; Flushing, NY: Senior Civil Engineer for the renovation of this 42-acre facility in Flushing Meadow Corona Park. Services included grading, utility, pavement, structural and cost engineering for the production of schematic designs, construction documents, specifications, and estimates for the following sub-projects: South Campus, Armstrong Stadium, Grandstand Stadium, Ticket Office Relocation, and West Side Redevelopment. • City of New Rochelle Department of Public Works Drainage Improvements at City Park; New Rochelle, NY Project Manager and Engineer of Record for the design of storm improvements at five different locations around the City’s park. Solutions include a 200,000 cubic feet detention tank, new storm structures, and pipe upsizing. • Westchester County Department of Public Works and Transportation Drainage Improvements at Westchester County Center; White Plains, NY: Project Manager for the design of stormwater solutions to alleviate the center from yearly flooding. Improvements included a mechanized flood gate, concrete flood barrier, and the redevelopment of the facility’s drainage system including the installation of tide valves and a pump station. • Town of Oyster Bay Parking Field Improvements; Oyster Bay, NY: Project Manager/Senior Civil Engineer for the design of improvements to reconstruct the existing O-3 parking field to address issues of boundary definition, access, drainage, pavement condition, and lighting. • Village of Malverne Improvements to Ackley Avenue Area; Malverne, NY: Project Manager for the design of roadway improvements in the Village of Malverne. The scope of work includes full-depth reconstruction of the existing pavement, replacement of sod, curbs, gutters, concrete aprons/sidewalks, handicap ramps, and road castings; structural repairs; and cleaning of the existing drainage system.
Page 459
• Farmingdale Union Free School District Howitt Middle School Aquatic Center and Athletic Field Complex; Farmingdale, NY: Senior Project Engineer responsible for electrical design for the District’s new Aquatic Center. Prepared electrical plans and specifications for the design of electrical power systems, pool equipment power and control, HVAC equipment power and control, lighting, fire alarm system, information technology network and system, audiovisual system, public address system, CCTV, and security system for the Aquatic Center. The center consists of a competition pool, public pool, competition locker rooms, public locker rooms, pool equipment room, and miscellaneous office and storage areas. Also designed site lighting for the construction of a new synthetic turf multi-purpose field striped for various sports teams. • East Islip Union Free School District High School and Middle School Athletic Field Upgrades; Islip Terrace, NY: Senior Project Engineer responsible for exterior lighting plans and specifications as part of upgrades to the Middle School and High School athletic fields. • Carle Place Union Free School District High School Athletic Fields Renovation; Carle Place, NY: Project Engineer responsible for lighting design for renovation of the High School baseball and football fields. Both fields were outfitted with new stadium lighting. Due to the proximity to adjacent residential properties, the design incorporated shields to minimize the amount of lighting that left the school property. • East Islip Union Free School District District-Wide Security Vestibules; Islip Terrace, NY: Senior Project Engineer responsible for electrical plans and specifications for new secure entrance vestibules at seven District buildings, as well as the replacement of several exterior doors. The scope also included lighting design. • East Islip Union Free School District High School Locker Room Renovation; Islip Terrace, NY: Senior Project Engineer responsible for renovations to the existing High School locker rooms, showers, and toilets, totaling approximately 8,500 square feet. HVAC, plumbing, and electrical systems were completely replaced. New rooftop ventilation and exhaust systems were provided, minimizing ductwork sizes to maximize ceiling heights in the existing locker room areas. Skylights were replaced and energy efficient daylight sensors were used to take advantage of natural light and control light levels. • Dormitory Authority of the State of New York (DASNY) CUNY Bronx Community College Pool Rehabilitation; Bronx, NY: As Project Engineer, prepared electrical plans and specifications for design and modification of the existing electrical power systems, pool equipment power and control, HVAC equipment power and control, lighting, and fire alarm system for the Bronx Community College competition pool and associated pool equipment room. • Mineola Public Schools High School AC Upgrades; Garden City Park, NY: Senior Project Engineer responsible for the design of electrical systems associated with air conditioning upgrades at Mineola High School. • Carle Place Union Free School District Middle/High School Library Renovation; Carle Place, NY: Project Engineer responsible for electrical plans and specifications for renovation of the Middle/High School library. The scope included electrical power and lighting, as well as upgrades to fire alarm detection systems. Education B.S., Electrical and Computer Engineering; New York Institute of Technology Licenses/ Certifications Professional Engineer: NY, NJ, FL Dale Carnegie Training Program H2M Project Management Training Program Mr. Starke is an electrical engineer with 15 years of experience providing electrical design for water, wastewater, and industrial projects. As H2M’s Assistant Department Manager of Electrical Engineering, he is responsible for leading a team of staff in the execution of high-quality electrical designs. Mr. Starke’s areas of expertise include power distribution design, new electrical services and service upgrades, motor control centers, programmable logic controls (PLC), emergency generators and systems, interior and exterior lighting, fire alarm systems, CCTV and access control systems, and security alarm systems. Selected project experience Assistant Vice President, Assistant Department Manager - Electrical Engineering Charles J. Starke P.E.
Page 460
• Village of Westhampton Beach Phase 1 Sewer Collection and Conveyance System; Westhampton, NY: Project Engineer responsible for the design of over 2,000 linear feet of gravity sewer, 15,000 linear feet of sanitary force main and two pump stations to convey sanitary sewerage flow from the Village of Westhampton Beach Main Street business district to an existing County Sewage Treatment Plant. Prepared construction documents for all collection and conveyance infrastructure, including the evaluation of mechanical equipment, pump station facility layout and piping, utility upgrades and pump station site plans. Provided construction administration and management services for construction including shop drawing review, review of payment requests, and coordination of project meetings. • City of New Rochelle Sanitary Sewer Evaluation; New Rochelle, NY: Project Engineer and Lead Designer responsible for the evaluation and design of 20,000 linear feet of gravity sewer enhancements in downtown New Rochelle, NY. The project required that the existing gravity sewers, some of which have been in service for 100 plus years, be upsized to accommodate flows from future developments. Responsibilities included preparation of an engineering design report, utility coordination, preparation of detailed design documents, and design during construction services. Created hydraulic models for each phase of development that was used to schedule and budget future sewer improvements. Provided City with cost estimates, schedule, and future flow projects for planning of improvements. • Suffolk County Sewer District No. 6 Kings Park Downtown Sewer Extension; Kings Park, NY: Project Manager responsible for the preparation of bid ready construction documents, construction administration, and inspection services for a multi-prime contract consisting of a new sanitary pump station, 12,000 linear feet of gravity sewer, and 7,300 linear feet of force main. Responsibilities included coordination and permitting with NYSDOT, public outreach, management of inspection staff, and management of contracts. • Suffolk County Sewer District No. 18 Zone IV Sewer Extension; Happauge, NY: Project Manager/Lead Designer responsible for the design of a Zone IV collection and conveyance system for the Happauge Industrial Park. Responsible for design of pump station, gravity collection system and force main. Coordinated design with utilities, including close proximity to high voltage oil static electric transmission line. Assisted County with land acquisition for the pump station site. • Westchester County Department of Public Works, McGregory Brook Relief Sewer; Peekskill, NY: Senior Project Engineer for the evaluation of an 18-inch diameter trunk sewer segment with known capacity issues. Provided assistance with hydraulic modeling of existing conditions and modeling of alternatives. • Village of Patchogue Sewage Treatment Plant 1.2 MGD Facility Plan; Patchogue, NY: Project Engineer responsible for writing the facility plan for the upgrade of a 0.8 MGD integrated fixed film and activated sludge (IFAS) treatment plant to 1.2 MGD. Evaluated the capacity of all treatment system components including the headworks, grit chamber, pump stations, process tanks, clarifiers, UV disinfection, membrane sludge thickener, and sludge holding tank. Prepared the hydraulic profile based on peak projected flow rate and verified the mass balance through the treatment plant to meet the facilities permit requirements. • Village of Patchogue River Sewers; Patchogue, NY: Project Engineer responsible for the design of approximately 30,000 linear feet of low-pressure sewer system (LPSS) as part of a project to connect approximately 500 parcels to the existing sewage treatment plant in the Village of Patchogue, NY. Evaluated the system hydraulics including layout and sizing of the sewer network, and calculated projected flows. Education B.S., Bioengineering; Binghamton University H2M Project Management Certification Licenses/ Certifications Professional Engineer: NY, FL Memberships NY Water Environment Federation Awards LIBN 30 under 30 (2021) Select Society of Sanitary Sludge Shovelers (SSSSS) – Bronze Shovel (2021) New York Water Environment Association, Inc. (NYWEA) - Long Island Chapter - Rising Star (2023) Mr. Vierling has more than 10 years of experience in the planning, engineering design, and design during construction services for sanitary wastewater projects, including gravity sewer collection systems, low pressure sewer collection systems, pumping stations, force mains, and sanitary treatment systems. His responsibilities include the preparation of plans, specifications, evaluation of piping and pumping systems, modeling of collection systems, feasibility studies, and engineering design reports. He is also responsible for construction administration services, including review of contractor submittals, bid evaluation, and review of schedules. Selected project experience Associate, Discipline Engineer - Water & Wastewater Engineering James M. Vierling P.E.
Page 461
TAB 4
Page 462
Page 7 of 7 APPENDIX A Cost Proposal Name of Engineering Firm: ___________________________________________________ Services Needed On-Call Engineering and Related Services Please indicate your firm’s hourly fees over the five-year period of the contract Billing Category Hourly Billing Rate Project Manager ________________ Chief Engineer ________________ Engineer ________________ Technician Support ________________ Clerical/Researcher ________________ Other ________________ Other Expenses (if applicable): Identify any other categories and costs required to provide Engineering and On-Call services that are not included above: ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ H2M Architects & Engineers, Inc. Please see attached.
Page 463
Municipal 2026 B Hourly Rate Schedule Classification Rate Classification Rate ADMINISTRATIVE ASSISTANT TO THE COO $126.00 PROJECT COORDINATOR 2 $110.00 ADMINISTRATIVE SUPPORT PROFESSIONAL $104.00 PROJECT DESIGNER 1 - ARCH. $150.00 ASSISTANT DEPARTMENT MANAGER - COATINGS $150.00 PROJECT DESIGNER 1 - ENG. $150.00 ASSISTANT DEPARTMENT MANAGER - ENG $253.00 PROJECT DESIGNER 2 - ARCH. $168.00 ASSISTANT DEPARTMENT MANAGER-SCI $197.00 PROJECT ENGINEER 1 $168.00 ASSISTANT ENGINEERING MANAGER $251.00 PROJECT ENGINEER 2 $190.00 ASSISTANT PROJECT COMPLIANCE MANAGER $132.00 PROJECT ENVIRONMENTAL PLANNER 2 $145.00 ASSISTANT PROJECT MANAGER $177.00 PROJECT LANDSCAPE ARCHITECT 2 $156.00 ASSISTANT STUDIO DIRECTOR $248.00 PROJECT SCIENTIST 1 $145.00 BIM / CAD PROGRAM MANAGER $156.00 PROJECT SCIENTIST 2 $156.00 BIM/CAD STAFF DESIGNER 1 $102.00 PROJECT SURVEYOR 2 $154.00 CAD TECHNICIAN 2 $121.00 RESIDENT ENGINEER $242.00 CHIEF EXECUTIVE OFFICER $259.00 SAFETY MANAGER $213.00 CHIEF OPERATING OFFICER $259.00 SR. ADMIN SUPPORT PROFESSIONAL $133.00 CHIEF GROWTH AND DEVELOPMENT OFFICER $259.00 SR. ARCHITECT 1 $207.00 CHIEF PROJECT PERFORMANCE OFFICER $259.00 SR. ARCHITECT 2 $230.00 COATINGS INSPECTOR 1 $122.00 SR. ARCHITECT 3 $253.00 COATINGS INSPECTOR 2 $145.00 SR. BIM/CAD SPECIALIST 1 $133.00 CONSTRUCTION ADMINISTRATOR $179.00 SR. BUSINESS DEVELOPMENT SPECIALIST 1 $204.00 CONSTRUCTION INSPECTOR 1 $127.00 SR. BUSINESS CONSULTANT 1 $217.00 CONSTRUCTION INSPECTOR 2 $145.00 SR. CAD TECHNICIAN 1 $127.00 CONSTRUCTION INSPECTOR 3 $161.00 SR. CAD TECHNICIAN 2 $145.00 CORPORATE HEALTH AND SAFETY MANAGER $174.00 SR. COATINGS INSPECTOR 1 $179.00 DEPARTMENT MANAGER - COATINGS SERVICES $259.00 SR. CONSTRUCTION INSPECTOR 2 $207.00 DEPARTMENT MANAGER - ENG $259.00 SR. CONSTRUCTION INSPECTOR 1 $190.00 DEPARTMENT MANAGER-ENV PLAN $254.00 SR. DESIGNER 1 - ENG. $184.00 DEPARTMENT MANAGER - SCI $259.00 SR. DESIGNER 1-ARCH $179.00 DEPARTMENT MANAGER - SURVEY $259.00 SR. DISCIPLINE SCIENTIST $225.00 DEPUTY DISCIPLINE DIRECTOR $259.00 SR. ENVIRONMENTAL TECHNICIAN 1 $144.00 DEPUTY ENGINEERING DIRECTOR $259.00 SR. GIS SPECIALIST 1 $164.00 DEPUTY MARKET DIRECTOR $259.00 SR. GIS SPECIALIST 2 $185.00 DIRECTOR OF ENGINEERING $259.00 SR. DISCIPLINE ENGINEER $259.00 DIRECTOR OF GIS SERVICES $259.00 SR. INTERIOR DESIGNER 1 $202.00 DIRECTOR OF OPERATIONS $259.00 SR. LANDSCAPE ARCHITECT $230.00 DIRECTOR OF PLANNING $259.00 SR. PROJECT ARCHITECT 1 $197.00 DIRECTOR OF QA/QC $259.00 SR. PROJECT ARCHITECT 2 $207.00 DISCIPLINE DIRECTOR $259.00 SR. PROJECT CONTROLS SPECIALIST 2 $219.00 DISCIPLINE ENGINEER $242.00 SR. PROJECT DESIGNER 1 $190.00 DISCIPLINE SCIENTIST $191.00 SR. PROJECT DESIGNER 2-ARCH $197.00 DOCUMENT CONTROL MANAGER $133.00 SR. PROJECT DOCUMENT CONTROL SPECIALIST $139.00 ENVIRONMENTAL TECHNICIAN 1 $88.00 SR. PROJECT INTERIOR DESIGNER 1 $202.00 ENVIRONMENTAL TECHNICIAN 2 $88.00 SR. PROJECT ENGINEER 1 $219.00 EXECUTIVE ASSISTANT $207.00 SR. PROJECT ENGINEER 2 $230.00 FIELD SUPERVISOR - COATINGS $184.00 SR. PROJECT SCIENTIST 1 $179.00 MANAGER OF CONSTRUCTION INSPECTION $219.00 SR. PROJECT SCIENTIST 2 $197.00 MANAGER OF CONSTRUCTION INSPECTION, MELVILLE $197.00 STAFF ENGINEER 2 $150.00 MARKET DIRECTOR $259.00 STAFF DESIGNER 1 $127.00 MARKET SPECIALIST $259.00 STAFF ENGINEER 1 $133.00 OFFICE DIRECTOR $259.00 STAFF DESIGNER 2 $133.00 PLANT OP & COMPL MANGR $250.00 SR. PROJECT SURVEYOR 2 $207.00 PRACTICE LEADER/MANAGER - ENG $259.00 STAFF ENVIRONMENTAL PLANNER 2 $116.00 PRACTICE LEADER/MANAGER - LA $259.00 STAFF GIS SPECIALIST 2 $116.00 PRACTICE LEADER/MANAGER - PLAN $259.00 STAFF INTERIOR DESIGNER 1 $100.00 PRACTICE LEADER/MANAGER - SCI $259.00 STAFF SCIENTIST 1 $116.00 PRACTICE LEADER/MGR - ARCH $259.00 STAFF SCIENTIST 2 $127.00 PRINCIPAL MARKET DIRECTOR $259.00 STAFF SURVEYOR 1 $99.00 PRINCIPAL OFFICE DIRECTOR $259.00 STAFF SURVEYOR 2 $116.00 PROGRAM MANAGER $259.00 STAFF PLANNER 1 $99.00 PROJECT ARCHITECT 1 $161.00 STUDENT INTERN $76.00 PROJECT ARCHITECT 2 $174.00 STUDIO DIRECTOR $259.00 PROJECT BIM/CAD ENGINEER 1 $159.00 TECHNICAL ADVISOR-DIR $259.00 PROJECT CONTROLS SPECIALIST 1 $145.00 TECHNICAL ADVISOR-ENG $259.00 PROJECT COORDINATOR 1 $92.00 TECHNICAL DIRECTOR-ARCHITECTURE $259.00 1. Rates updated annually in January. 2. When employees are part of the survey crew working on projects where we are required to pay Prevailing Wage Rates, these rates don't apply. Different rates will be provided in these circumstances.
Page 464
1 Contract Reservations H2M reserves the right to negotiate reasonable insurance, liability, and claims provisions that are consistent with industry standards and the standard of professional care applicable by law. ► Contract Reservations
Page 465
ARCHITECTURE • CIVIL • CONSTRUCTION • ELECTRICAL • ENVIRONMENTAL • FIRE PROTECTION • FORENSIC • GEOLOGY • GIS • INTERIOR DESIGN • LANDSCAPE ARCHITECTURE • LAND SURVEY • MECHANICAL • PLUMBING • PLANNING • SOLID WASTE • STRUCTURAL • SUSTAINABLE DESIGN • WASTEWATER • WATER *ENTERPRISE CAPABILITIES h2m.com BUILDING COMMUNITIES SINCE 1933
Page 466
Page 467
Page 468
Page 469
Page 470
Page 471
Page 472
Page 473
Page 474
Page 475
Page 476
Page 477
Making Sustainability Happen Proposal Professional Engineering Services Prepared For: Town of Granby, CT RFQ No: 141.051644.00001 July 24, 2026
Page 478
SLR International Corporation 99 Realty Drive, Cheshire, Connecticut, 06410 July 24, 2026 Mr. Mike Walsh, Town Manager Town of Granby 15 North Granby Road Granby, CT 06035 SLR Project No.: 141.051644.00001 RE: Request for Proposal – Professional Engineering Services Dear Mr. Walsh, On behalf of SLR International Corporation (SLR), we are pleased to submit our proposal and qualifications to the Town of Granby for engineering services for the Replacement of the Athletic/Running Track and adjacent Baseball and Softball Fields at the High School/Middle School Complex and Engineering Services tasks associated with capital infrastructure at Salmon Brook Park. Our team is enthusiastic about the opportunity to help enhance the school’s athletic infrastructure for its student-athletes and the broader community. When reviewing our submittal, we respectfully highlight the following: • SLR is a multidisciplinary consulting firm and a recognized leader in the design of state-of-the-art outdoor athletic facilities across New England for more than 30 years. • We have recently completed similar renovation projects at: o Lyme-Old Lyme High School o Stamford High School o Middletown High School o Westfield High School (Westfield, MA) Our project team brings decades of experience and a deep understanding of athletic facility renovations throughout Connecticut. Under the direction of Michael Doherty, PLA, North America Practice Leader, Landscape Architecture, the project will be led by Kevin Fuselier, PLA, LEED GA, Senior Principal / Team Leader Landscape Architecture. Mr. Fuselier has nearly two decades of experience managing comparable projects and is a recognized expert in outdoor athletic facility design. He will be supported by: • John Hammer, PLA, who will contribute to all phases of the project and brings extensive experience in athletic facility design, procurement, and construction oversight. • Ryan McEvoy, PE, who will lead civil engineering efforts and offers recent local experience through multiple projects. • Our in-house team of environmental scientists, survey crews, and geotechnical engineers. We appreciate your consideration and welcome the opportunity to discuss our proposal in greater detail. Please feel free to contact Kevin Fuselier, Project Manager, with any questions. Regards, SLR International Corporation Michael Doherty, PLA North America Practice Leader, Landscape Architecture mtdoherty@slrconsulting.com 203.271.1773 Kevin Fuselier, PLA, LEED GA Senior Principal / Team Leader Landscape Architecture kfuselier@slrconsulting.com 203.271.1773 Ext. 2273
Page 479
Contents Cover Letter 1.0 Summary of Qualifications 2.0 Project Understanding 3.0 Relevant Experience / References 4.0 Project Team 5.0 Services Expected of the Town 6.0 Cost Proposal Form
Page 480
Section 1
Page 481
Summary of Qualifications Company Overview Who We Are SLR International Corporation (SLR) is an international environmental consultancy that provides tailored environmental and engineering services across seven industry sectors – built environment, industry, infrastructure, mining & minerals, energy, power, and financial services. SLR International Corporation is 100% owned by SLR Holdings Limited, which falls under SLR Management Limited and SLR Global Limited originating out of the UK. SLR Management Limited was incorporated in England, registration number 6538090, in 1994. SLR International Corporation, the US official business registration, was incorporated in 2000 in Washington. The following individuals serve as SLR’s US Directors and Officers: SLR’s Northeast operations are comprised mostly of the former Milone & MacBroom, Inc. (MMI) which was acquired in 2020. Founded in 1984, MMI served as the base for SLR to grow its US operations, offering specialized services and expertise from experienced technical staff. In the US, SLR currently has over 550 employees located in 25 offices that are strategically located to best serve our clients. Resources are frequently shared between departments and offices within the US and worldwide, with regular review between senior managers to reinforce the most effective use of skilled and experienced personnel. Bradley Andrews Chief Executive Officer Patrick Keaney Americas President Stephen Dietzko Americas Vice President Jason French Treasurer Tricia Chrzanowski Secretary, Head of Legal
Page 482
Summary of Qualifications Our team represents a broad and diverse range of technical and environmental capabilities. SLR’s professionals offer a blend of experience incorporating landscape architects, engineers, planners, environmental scientists, geologists, remediation specialists, and regulatory and compliance specialists. Our Northeast team provides niche expertise in the areas of planning, natural resources management, development of complete streets, and climate adaptation, effectively integrating engineering, landscape architecture, environmental science, and community planning. Our in-house disciplines provide the full gamut of expertise needed to take projects from visions to reality including preparing initial project concepts; developing project budgets, project development reports, and construction documents; and providing construction engineering and inspection services. We work with communities to provide successful, creative, and sustainable solutions. For this pursuit, the SLR Project Manager and Point of Contact will be Kevin Fuselier, PLA, LEED GA, and he can be reached at (203) 271-1773 ext. 2273 or at kfuselier@slrconsulting.com. Our Services and Experience Landscape Architecture The landscape architects at SLR apply artistic principles and technical design standards to enhance the built environment and preserve the natural landscape. Through careful analysis of the inherent functions of the natural landscape and the programmatic needs of our clients, the firm’s landscape architects collaborate with engineers, planners, and scientists to develop context-sensitive design solutions. These solutions are planned and designed to ensure respect for the surrounding land forms, the environment, and our client’s needs. Our design capabilities cover the full range of site development including active and passive municipal parks, playgrounds, greenways, streetscapes, city and town centers, residential communities, and commercial facilities. The variety in our client base has provided us with a broad range of experience and unique design skills to provide master planning through construction administration services for all project types. These services, as well as our superior quality of product, have gained us national recognition for our work.
Page 483
Summary of Qualifications Civil Engineering & Site Analysis Civil engineering was one of the first disciplines in which SLR was founded on. The Civil Engineering Department has been committed to providing comprehensive site development services from concept to construction. Site planning and green infrastructure design represent the merging of the Civil Engineering and Landscape Architecture disciplines. By understanding a site’s natural resources and their inherent characteristics and functions, our design professionals seek to blend creatively our client’s development program within the framework of the site’s opportunities and constraints. Geotechnical Engineering Geotechnical engineering is critical for understanding the earth on which a project will be constructed. A lack of information regarding soil conditions can lead to an unforeseen rise project costs. SLR provides geotechnical engineering experience to successfully accomplish the most difficult and complex engineering projects. Our firm has the depth and breadth to investigate and analyze projects of all sizes and types for private, local, state, and federal clients. Our geotechnical design services support all phases of a project and complement our civil engineering, landscape architecture, water resources and environmental science, planning, and transportation disciplines. Outdoor Athletic Facilities The sheer increase in participants of all ages and the choices of sports to play has pushed the design profession to create competitive athletic fields and courts that are safer, perform better, recover faster, last longer, and require less maintenance. SLR is recognized as a leader in the planning, design, and construction inspection of outdoor athletic facilities at the collegiate, scholastic, and recreational level, having been responsible for over $100 million in improvements in the past decade. Our projects involve an analysis of indoor and outdoor facility conditions to first identify problems and deficiencies that affect safety, longevity, and possible expansion before evaluating the existing appropriate uses of activities for the facilities. Our experience at both the scholastic and collegiate levels includes new and replacement synthetic playing fields, track and field facilities, hard courts, and multipurpose fields including natural grass baseball, softball, football, and soccer fields. Through our project experience, we have become very familiar with the requirements of the various athletic sanctioning bodies including NCAA, USTA, NFHSA, and individual state scholastic bodies. We have found that the design of competitive athletic facilities requires the evaluation of several critical issues that may affect the quality of play and longevity of the facility. Our staff evaluates the placement and orientation of a field for optimum performance, establishes the appropriate grades for each playing surface, develops a suitable stormwater collection system, analyzes the appropriate specifications and methods of placing fill to control settlement, and selects the appropriate blend of grasses and soil structure for proper turf quality.
Page 484
Summary of Qualifications Running Tracks SLR has been at the forefront in the design of running tracks for schools and colleges. Starting more than 30 years ago, we have been involved with numerous projects and have been able to observe the full life cycle of maintenance and repair. We are able to share this knowledge and experience with our clients in their selection of appropriate surface treatments. Natural Turf Fields SLR has extensive experience designing high-quality natural turf athletic fields and ballfields for schools, municipalities, colleges, and recreational organizations. Our team combines expertise in site planning, grading, drainage, irrigation, soil management, and field layout to create durable, safe, and high-performing playing surfaces. From multi-use athletic complexes to baseball and softball fields, SLR develops customized solutions that balance playability, maintenance requirements, sustainability, and long-term value. Through thoughtful design and attention to detail, we help clients deliver natural turf facilities that enhance the athlete experience and serve their communities for years to come. Synthetic Turf Fields SLR designed the first polyethylene sand-rubber infill field in Connecticut and has remained current in the available products and field systems since that installation in Norwalk more than 20 years ago. Through our own independent research, we have become experts in understanding the practical environmental risks that have been attributed to the use of crumb rubber infill and have the knowledge and experience to address those issues in our design solutions. We have worked closely with school project committees in guiding them through the process of understanding the differences among turf manufacturers and products in order to select the system that best meets their program needs. Our athletic field projects include: • Amity High School Synthetic Turf, Track & Grandstands - Woodbridge, CT • Lyme-Old Lyme High School Synthetic Turf - Old Lyme • Rockville High School Synthetic Turf & Track - Vernon, CT • Bunnell High School Turf Replacement, Lighting Upgrades, and Baseball / Multipurpose Field - Stratford, CT • O.H. Platt High School Synthetic Turf & Track - Meriden, CT • Francis T. Maloney High School Synthetic Turf & Track - Meriden, CT • Salisbury School Multipurpose Synthetic Turf Field - Salisbury, CT • Yale Bowl Synthetic Turf - New Haven, CT • Loomis Chaffee Synthetic Turf & Track - Windsor, CT • MacDuffie School Synthetic Turf Field - Granby, MA • Municipal Stadium Turf Replacement - Waterbury, CT • Foran High School Synthetic Turf Softball Field - Milford, CT • Westport Synthetic Turf Field Replacement - Westport, CT • Hall High School Turf Replacement - West Hartford, CT • Conard High School Turf Replacement - West Hartford, CT • Agawam High School - Agawam, MA • Berkshire Academy School - Sheffield, MA • Bryant University Football Field - Smithfield, RI • Dewitt Field at Yale University - New Haven, CT • Reese Stadium at Yale University - New Haven, CT • Yale Field at Yale University - New Haven, CT • Trumbull High School - Trumbull, CT • University of Bridgeport (Baseball) - Bridgeport, CT • Bristol Eastern / Central High School - Bristol, CT
Page 485
Summary of Qualifications • Masuk High School - Monroe, CT • Hamden High School (Baseball) - Hamden, CT • South Windsor High School - South Windsor, CT • Lauralton Hall - Milford, CT • The Gunnery - Washington, CT • Cos Cob Park - Greenwich, CT • Canton High School - Canton, CT • Farmington High School - Farmington, CT Tennis and Pickeball Courts SLR has designed tennis and pickleball facilities in a variety of settings including colleges, high schools, and recreational environments. The scale of the facilities ranges from two courts in a local playground to multicourt complexes designed for competition. We work closely with our clients to find the best solution for them including evaluating program requirements, site constraints, and weighing options for either bituminous concrete base or post-tensioned concrete base construction. Our projects involve an analysis of the existing conditions of the facility to identify issues that affect possible construction, the evaluation of appropriate uses of these facilities, and the design and construction administration of improvements. Each project is designed in accordance with Americans with Disabilities Act requirements and the rules of the sanctioning organization. The design of competitive athletic facilities requires the evaluation of several critical issues that may affect the quality of play. Our experienced staff evaluates the placement of a tennis court for optimum orientation and establishes the appropriate grades for each playing surface. We educate clients on the short- and long-term cost-benefit analysis in installing bituminous base versus post-tension concrete- based tennis courts. Universal Accessibility SLR always designs with universal access in mind. We are experts in state and federal guidelines including the Public Rights of Way Guidelines (PROWAG), American with Disabilities Act (ADA) Standards for Accessible Design and accessible trail and outdoor recreation facility guidelines created by the United States Access Board and U.S. Forest Service. At SLR, we understand the importance for all abilities to access the natural environment and share in the experience of our native habitats. Staff Availability SLR’s main office address is: 22118 20th Avenue SE, Suite G202 Bothell, WA 98021 The local office that would handle this service for the Town is: 99 Realty Drive Cheshire, CT 06410 (203) 271-1773 of our clients have worked with us for less than 3 years 36% of our clients have worked with us for over 3+ years 53% Clients of our clients have worked with us between 3-5 years 11% SLR
Page 486
Summary of Qualifications Workload Capacity SLR understands that time is of the essence with any project. Since its inception, SLR has maintained a successful track record in meeting its clients’ scheduling needs with high-quality services. Our first priority on any assignment is to coordinate and communicate with our clients to determine their project requirements and scheduling needs. SLR assembles its personnel in project teams based on the nature of the assignment and its specific requirements. At points where the schedule or workload intensifies, additional staff assignments are made consistent with the level of work required. Our first priority on any assignment is to coordinate and communicate with clients and the municipality to determine their specific project requirements and schedule needs. Our Project Manager will then assign a discipline-specific team to work with the municipality to formulate a scope of services and schedule. Work will be performed while adhering to the agreed upon schedule. SLR can assure the Town that the necessary technical, administrative, and support services will be made available to complete this assignment within the Town’s established schedule. Externally, our Project Managers and Principals maintain open and honest communication with our clients. For this project, monthly updates will be provided coincident with invoicing. Conference calls will be arranged when necessary to discuss project schedule and a project website will facilitate the sharing and availability of information. Work summaries will also be submitted with monthly invoices. The purpose of these communications will be to keep the Town informed. Perhaps the largest issue relating to schedule creep is lack of communication and/or length of time between regular communications. Our Project Managers and Principals are committed to identifying issues early, before they become problems. Subconsultant Services SLR will be joined by SG Engineering, LLC, (56 FOXCROFT CT, Southington, CT 06489) is a Connecticut licensed electrical engineering firm that will assist SLR with any project related electrical needs. Together, SLR and SG Engineering will serve as the Project Team and will work to successfully administer the requested services outlined in the RFQ. SLR will serve as the firm of record and party responsible for coordination of all project tasks. Financial Stability SLR has more than adequate resources to undertake the assignments, including financial resources, personnel, and equipment. SLR has a steady revenue stream with FY 2024 being the firm’s most substantial in its history. We have a banking relationship with U.S. Bank and have significant credit facilities with our parent company banking group. SLR is owned by SLR Global Limited, which is the parent of a group of companies with operations in 6 regions, 100+ offices in 13 countries, and over 4,500 global team members. SLR’s principal investor is Ares Capital Management which is a US-based private equity group. The firm has substantial insurance resources including auto, general, worker’s compensation, and professional liability policies. The firm’s financials are audited by an independent accounting firm on an annual basis. The US firm has no fixed or contingent project liabilities nor any encumbrances that would place any limitations whatsoever on the firm’s ability to perform its work, meet its obligations, or successfully complete the assignment.
Page 487
Section 2
Page 488
Technical Proposal Project Understanding SLR understands that the Town of Granby seeks professional engineering services to support a variety of capital improvement projects and municipal infrastructure initiatives through a five-year, task- order-based contract. The projects identified in the Request for Proposals include the replacement of the running track at Granby Memorial High School/Middle School; improvements to the baseball and softball fields at Granby Memorial High School/Middle School; design of a year-round restroom facility at Salmon Brook Park; construction of new pickleball courts at Salmon Brook Park; assessment and administration of a sewer pump maintenance project; and other civil engineering assignments associated with the Town’s capital infrastructure program. SLR recognizes that several project elements will require further evaluation and definition during the initial phases of work. Specifically, the Town may be considering improvements beyond those identified in the RFP, including potential replacement or enhancement of the existing synthetic turf field associated with the running track project and possible conversion of the baseball and softball fields to synthetic turf systems. Our team will work closely with Town staff and stakeholders to confirm project goals, establish design criteria, evaluate alternatives, and develop cost-effective solutions that align with the Town’s operational needs, budget, and long-term maintenance objectives. For the athletic facility projects, SLR will draw upon our extensive experience in the planning, design, and rehabilitation of outdoor sports facilities, including running tracks, natural turf and synthetic turf athletic fields, baseball and softball complexes, court facilities, drainage systems, site grading, lighting coordination, accessibility improvements, and supporting infrastructure. We understand the importance of creating safe, durable, and high-performing recreational facilities that serve students, athletes, and the community while minimizing disruptions to ongoing operations. For the Salmon Brook Park improvements, SLR understands the need to provide accessible, sustainable, and user-friendly recreational amenities that enhance the visitor experience and support year-round use of the park. Our approach will consider site constraints, utility availability, permitting requirements, accessibility standards, maintenance considerations, and opportunities for resilient and cost-effective design solutions. With respect to the sewer pump maintenance project and future municipal engineering assignments, SLR recognizes the importance of reliable public infrastructure and efficient project delivery. We will provide comprehensive engineering support, including condition assessments, design development, permitting assistance, bidding and procurement support, construction administration, and coordination with regulatory agencies as required. SLR views this assignment as an opportunity to serve as a trusted engineering partner to the Town of Granby, providing responsive, multidisciplinary expertise across a diverse range of projects. We understand that the scope and priorities of individual task orders may evolve over the five-year term, and we are prepared to deliver flexible, timely, and practical engineering solutions that support the Town’s capital improvement goals and enhance community assets for years to come.
Page 489
Section 3
Page 490
PROJECT PROFILE Making Sustainability Happen SLRCONSULTING.COM CLIENT SERVICES • Environmental Analysis • Design • Bidding • Construction Administration City of Stamford, CT The City of Stamford, through a competitive bid process, retained SLR to design a multipurpose synthetic turf field at the Stamford High School campus located at 55 Strawberry Hill Avenue. The existing project site consisted of a natural grass baseball field, and a natural grass softball field. Working through many design concepts, the City and school ultimately decided to not create one single multi-sport field, but rather a dedicated synthetic turf softball field, and a synthetic turf baseball field with an expanded outfield that fits a multi-sport field overlay. Both fields received all new treatments including backstops, fencing, dugouts, bleachers, bullpens, and batting cages. The new fields are interconnected to one another and to the school building through new Americans with Disabilities Act (ADA) walkways. Stamford High School Baseball & Softball Field STAMFORD, CT
Page 491
PROJECT PROFILE Making Sustainability Happen SLRCONSULTING.COM CLIENT SERVICES • Survey • Wetlands Investigation • Geotechnical Engineering • Civil Engineering • Landscape Architecture • Construction Administration Wallingford Public Schools Wallingford Public Schools retained SLR to design plans and specifications for the replacement of the running track and synthetic turf field at Sheehan High School. SLR survey crews created the base map for the project drawings. SLR geotechnical engineers invested the condition of the running track’s asphalt base and subsoils, which dictated the track replacement design and specifications. SLR also assisted the School through the bidding process and provided weekly construction inspections and oversight during the construction season. Mark T. Sheehan High School Track & Field Replacement WALLINGFORD, CT
Page 492
PROJECT PROFILE Making Sustainability Happen SLRCONSULTING.COM CLIENT SERVICES • Civil Engineering • Landscape Architecture Yale University Yale University contracted SLR to redesign their tennis facilities, the historical site of the Connecticut Open. SLR was responsible for the preparation of plans, specifications, and construction-phase services for the reconstruction of 12 of the Yale University varsity tennis courts. Six of the courts were demolished and reconstructed in the same location and six of the courts required a realignment prior to being reconstructed. The courts were surfaced with bituminous concrete and a cushioned DecoTurf surface. In addition, various other Yale University Varsity Tennis Courts NEW HAVEN, CT site improvements such as new fencing with fan boxes, surrounding walkways, and updated landscaping were included in the project. The DecoTurf cushioned surfacing system provided a state-of-the-art surface that the athletes could trust for safe, comfortable gameplay and the numerous site improvements improved the spectator experience. The project was completed on time for use in the 2019 Connecticut Open, a professional tennis tournament usually played just before the fourth and last Grand Slam tournament of the year, the US Open.
Page 493
PROJECT PROFILE Making Sustainability Happen SLRCONSULTING.COM CLIENT SERVICES • Master Plan • Civil Engineering / Site Design • Landscape Architecture • Permitting • Construction Administration Greens Farms Academy Greens Farm Academy, an independent school in Westport, Connecticut, retained SLR as the lead consultant to design the expansion of its outdoor athletic facilities. The initial services involved the development of a site master plan for the fields and related roads, parking, and infrastructure. The first phase of construction included a synthetic turf field, baseball fields, and a tennis complex. Greens Farms Academy Athletic Fields WESTPORT, CT The second phase included the development of three additional natural grass fields. The final phase of improvements included a new softball field and new driveway and parking facilities. Extensive landscaping was installed to provide a visual and noise buffer for adjacent residential properties. Given the proximity to tidal wetland of Long Island Sound, stormwater management was critical to receiving local and state environmental permits. “Rain garden” water quality basins were constructed to manage peak flows. Pervious bituminous concrete was installed in the new parking areas. A gravel blanket was installed beneath the natural grass fields to promote infiltration and reduce direct runoff. An integrated turf management plan was prepared including a groundwater monitoring system to carefully control the use of fertilizers and other turf chemicals.
Page 494
PROJECT PROFILE Making Sustainability Happen SLRCONSULTING.COM CLIENT SERVICES • Survey • Geotechnical Engineering • Landscape Architecture • Civil Engineering • Bid Assistance • Construction-Phase Services City of Middletown, CT SLR worked extensively with the Middletown High School Track and Field building committee to investigate the existing facility and then prepare the construction documents for the replacement of the running track and synthetic turf field at Middletown High School. The project included a full-depth replacement of the 8-lane running track and event areas, along with the replacement of the running track’s interior synthetic turf field. SLR attended monthly building committee meetings to provide project updates and made weekly site visits during construction to oversee the progress of the project. Middletown High School Track & Field MIDDLETOWN, CT
Page 495
PROJECT PROFILE Making Sustainability Happen SLRCONSULTING.COM CLIENT SERVICES • Topographic Survey • Geotechnical Engineering • Civil Engineering • Landscape Architecture • Construction Administration Portland Schools SLR was awarded the design of a high school athletic facility project by Portland Schools. The running track at the town high school had well surpassed its life expectancy and needed to be replaced or be closed off from use dure to safety concerns. The existing asphalt based running track was demolished and replaced with a state- of-the-art post- tensioned concrete based running track making it the fifth running track in the state of Connecticut constructed with a post-tensioned concrete base. Portland High School Running Track Replacements PORTLAND, CT The benefit of constructing bases with post-tensioned concrete in lieu of traditional asphalt is that the base will not crack over time thus requiring costly repairs or replacement. The grass multipurpose playing field within the track was protected and maintained throughout construction. An improved drainage system as well as improvements to the spectator seating areas and universally accessible walks were also designed and constructed as part of the project.
Page 496
PROJECT PROFILE Making Sustainability Happen SLRCONSULTING.COM CLIENT SERVICES • Survey • Landscape Architecture • Public Outreach • Water Supply Planning • Design Documents • Permitting Regional School District No. 18 SLR was retained by the Regional School District No. 18 to analyze the existing grass multiuse athletic fields at the Lyme-Old Lyme High School campus to determine which of their three fields was most suitable to convert to a synthetic grass playing surface. SLR conducted topographic surveys for the three sites under consideration, followed by preparation of schematic designs and rough order of magnitude pricing. SLR prepared an online survey which allowed the school district to solicit comments and feedback regarding the needs of the school’s athletic programs and the deficiencies Lyme-Old Lyme High School Athletic Field OLD LYME, CT of the existing facilities. The outcome of this investigation influenced the school district to select a preferred field to convert to synthetic turf. Another outcome of this initial phase was the realization that the school campus, which is comprised of three schools, had another critical issue regarding the lack of water for both building uses and field irrigation. While funding for the synthetic turf field was ongoing, SLR specialists were once again retained to help the school district explore additional sources of water on campus and design a new water supply system which allowed the school to have a dedicated potable water source for building use, and a new independent water supply for field irrigation use. In 2020, with funding for the turf field in place, SLR prepared final design documents for the field, assisted the school district in obtaining the necessary land use permits and put the project out to bid. Construction of the new field commenced in the summer of 2021. The school district worked with SLR to obtain additional land use approvals for the inclusion of athletic field lighting into the project.
Page 497
PROJECT PROFILE Making Sustainability Happen SLRCONSULTING.COM CLIENT SERVICES • Topographic Survey • Wetlands Delineation • Geotechnical Engineering • Civil Engineering • Structural Engineering • Landscape Architecture • Public Engagement • Permitting • Cost Estimating City of Westfield, MA SLR is currently contracted to provide construction oversight for the proposed athletic facility improvements at Westfield High School. The scope of work includes the development of a new track and field complex, throwing event areas, a synthetic turf field within the stadium, bleachers and press box, restroom and concession facilities, pedestrian and field lighting, a synthetic turf softball diamond, and synthetic turf installation at Boardman Field. All three athletic fields will utilize synthetic turf with no We s t fi eld High School Athletic Fields WESTFIELD, MA intentionally added PFAS chemicals, in alignment with current environmental and public health standards. These improvements will enable the school to host track and field and football events on- site, addressing the current reliance on off-campus facilities and significantly enhancing accessibility for student-athletes. This project is the result of feasibility studies and preliminary design efforts led by SLR. The construction, valued at approximately $9 million, is being executed by Mountain View Landscapes, with SLR serving as the construction oversight consultant to ensure quality and compliance throughout the build.
Page 498
PROJECT PROFILE Making Sustainability Happen SLRCONSULTING.COM CLIENT SERVICES • Landscape Architecture • Civil Engineering • Geotechnical Engineering • Wetland Investigations • Cost Estimating Cheshire Public Schools In 2023, Cheshire Public Schools partnered with SLR to reimagine the outdoor athletic experience at Cheshire High School. From the outset, SLR engaged coaches, administrators, and district leaders to understand how the facilities are used today and what the community envisions for the future. To ground the planning effort in solid technical insight, SLR’s geotechnical team completed a detailed subsurface investigation of the running track, while our wetland scientists evaluated and delineated nearby watercourses to ensure environmental compliance. Working alongside a local contractor, we also opened targeted test pits across the natural grass fields to assess existing conditions and inform design opportunities. With a clear understanding of site constraints and program goals, SLR crafted two forward looking master plan concepts that position the district to enhance safety, elevate athletic performance, and create a more vibrant, resilient campus environment. Maclary Sports Complex Masterplan CHESHIRE, CT
Page 499
PROJECT PROFILE Making Sustainability Happen SLRCONSULTING.COM BRITANNIA STREET TREMONT STREET LOCUST STREET 8% 5.2% 25' DUGOUT (TYP.) 180' 180' MAINTENANCE/STORAGE SHED 180' REUSE EXISTING BLEACHERS (TYP.) DUGOUT (TYP.) 275' REUSE EXISTING BLEACHERS (TYP.) 40' 275' 300' SCOREBOARD SCOREBOARD SIDEWALK CONNECTIONS (TYP.) NEW 60' SOFTBALL DIAMOND NEW 90' BASEBALL DIAMOND NEW PARKING LOT POTENTIAL STORMWATER MANAGEMENT AREA POTENTIAL STORMWATER MANAGEMENT AREA 61 Copyright SLR International Corporation - 2021 99 REALTY DRIVE CHESHIRE, CT 06410 203.271.1773 SLRCONSULTING.COM CLIENT SERVICES • Site Survey • Landscape Architecture • Schematic Design • Cost Estimation • Soils Testing • Wetland Investigation • Geotechnical Investigation • Irrigation Design • Civil Engineering • Permitting Meriden Public Schools SLR was retained by Meriden Public Schools to redesign an existing ball field complex historically used for Little League. When completed, the redesign facility will be home to a new regulation softball field, and a regulation high school size baseball field. North End Field at Britannia Street MERIDEN, CT SLR is designing the facility so that it can be constructed with natural grass fields or, if funding permits, with synthetic turf surfacing. SLR is responsible for designing irrigation, field lighting, and restroom facilities.
Page 500
PROJECT PROFILE Making Sustainability Happen SLRCONSULTING.COM CLIENT SERVICES Loomis Chaffee School • Survey • Geotechnical Engineering • Landscape Architecture • Civil Engineering • Bid Assistance • Construction Phase Services Building on a long-standing relationship with the Loomis Chaffee School, SLR was once again retained in 2025 to design the replacement of the running track at the School’s Windsor, Connecticut campus. The project began with comprehensive site investigations, including a new topographic survey of the track and its surrounding areas. SLR’s geotechnical team also performed a series of borings to evaluate the condition and reusability of the existing base materials. Their assessment concluded that while the track base required full replacement, the existing asphalt could be pulverized and reused to support the new track system. SLR managed the competitive bidding process on behalf of the School, reviewing contractor submissions and conducting interviews with the low bidders. When construction begins in Spring 2026, SLR will provide ongoing oversight, including review of material submittals, facilitation of on-site project meetings, and construction observation to verify compliance with the design documents. Loomis Chaffee School Track Reconstruction WINDSOR, CT
Page 501
PROJECT PROFILE Making Sustainability Happen SLRCONSULTING.COM CLIENT SERVICES • Civil Engineering/Site Design • Landscape Architecture • Permitting • Construction Administration FieldTurf SLR was retained by FieldTurf to provide engineering and design services for the running tack reconstruction and the installation of a synthetic turf field at Amity High School. Track and Field Construction at Amity High School WOODBRIDGE, CT The existing asphalt running track was replaced with the post-tensioned concrete track. In addition to the new running track and synthetic turf field, SLR provided design assistance for new LED athletic field lighting, an LED video scoreboard, elevated grandstand, and facility walkways and drives. SLR prepared all land use applications and presented the project at land use commission meetings. Throughout the duration of construction, SLR provided construction oversight on a weekly basis.
Page 502
PROJECT PROFILE Making Sustainability Happen SLRCONSULTING.COM CLIENT SERVICES • Topographic Survey • Geotechnical Engineering • Wetland Investigation • Environmental Investigation • Permitting • Landscape Architecture • Civil Engineering • Construction Inspection Amherst-Pelham Regional School District SLR was engaged by the Amherst-Pelham Regional School District to design a state-of-the-art track and field complex at Amherst- Pelham Regional High School in Amherst, Massachusetts. Working closely with the school’s building committee, SLR developed a competition-grade running track surrounding a high- performance natural grass multipurpose field, complete with subsurface drainage and a modern irrigation system. The facility also features a high- mast LED lighting system to support extended use. A unique aspect of the project was its location over the Tan Brook culvert, which bisects the site. To protect this sensitive watercourse, the design and construction teams implemented specialized inspections and mitigation measures to avoid disturbance. In addition to the primary field, the project included the construction of a second high- Amherst-Pelham Regional High School Track & Field Improvements AMHERST, MA performance multipurpose field adjacent to the track. The overall site improvements also incorporated ADA-compliant walkways and upgraded on- and off-street parking to enhance accessibility and user experience.
Page 503
PROJECT PROFILE Making Sustainability Happen SLRCONSULTING.COM CLIENT SERVICES • Request for Proposal (RFP) Preparation • Design Specifications • Bid Assistance • Construction Administration Asistance Town of Windsor, CT SLR was retained by the Town of Windsor to assist in the preparation of a design-build request for proposal (RFP) to replace the existing asphalt tennis courts at the high school with new posttensioned concrete courts. In addition to installing 6 new tennis courts and perimeter fencing, the existing metal halide lighting was replaced with competition level LED lighting. Windsor High School Tennis Court Reconstruction WINDSOR, CT SLR assisted the town with preparing and issuing the RFP, responding to bidders’ questions, and bid review. Throughout construction, SLR participated in onsite construction meetings and periodic inspection of the work assuring it’s conformance to the project requirements.
Page 504
PROJECT PROFILE Making Sustainability Happen SLRCONSULTING.COM CLIENT SERVICES • Procurement • Construction Oversight Town of Windsor, CT The town selected a contractor via a design/build process. SLR provided procurement and construction oversight services to the Town of Windsor for the reconstruction of tennis courts. SLR reviewed submittals and oversaw the construction of new post-tensioned concrete pickleball courts, tennis courts, a shade structure and sound barrier wall. L.P. Wilson Community Center Pickleball & Tennis Courts WINDSOR, CT
Page 505
PROJECT PROFILE Making Sustainability Happen SLRCONSULTING.COM CLIENT SERVICES • Survey • Geotechnical Investigations • Landscape Architecture • Civil Engineering • Bidding Assistance • Construction Phase Services Snyder Architects SLR provided survey, geotechnical, design, bidding, and construction phase services for the reconstruction of tennis courts for the Town of Stratford. The project included the removal of two clay tennis courts, which were replaced with four new post-tensioned concrete tennis courts and included a new LED court lighting system. Longbrook Park Tennis Courts STRATFORD, CT
Page 506
PROJECT PROFILE Making Sustainability Happen SLRCONSULTING.COM CLIENT SERVICES • Survey • Geotechnical Investigations • Landscape Architecture • Civil Engineering • Bidding Assistance • Construction Phase Services Laurel Beach Association SLR worked extensively with the association to develop design concepts to replace the existing tennis courts at the Laurel Beach Association in Milford, CT. Once a preferred concept was selected, SLR provided survey, geotechnical, design, bidding and construction phase services for the construction of three post- tensioned concrete tennis courts, and four pickleball courts. Laurel Beach Association Pickleball & Tennis Courts MILFORD, CT
Page 507
PROJECT PROFILE Making Sustainability Happen SLRCONSULTING.COM CLIENT SERVICES • Survey • Landscape Architecture • Civil Engineering • Bidding Assistance • Construction Phase Services Town of Bethlehem, CT SLR worked extensively with the town to develop a master plan for Memorial Park. For Phase 1 of the master plan implementation, we developed design concepts to replace the existing bituminous tennis courts and upgrading the adjacent parking lot/ entry drive to increase functionality. Memorial Park Tennis & Pickleball Courts BETHLEHEM, CT Once a preferred concept was selected, SLR provided survey, design, bidding and construction-phase services for the construction of two post-tensioned concrete tennis courts, two post tensioned concrete pickleball courts, a concrete plaza viewing area and upgraded parking lot.
Page 508
TECHNICAL SERVICE Making Sustainability Happen SLRCONSULTING.COM • Borough of Naugatuck, CT • City of Bridgeport, CT • City of Danbury, CT • City of Derby, CT • City of Dover, NH • City of Groton, CT • City of Hartford, CT • City of Lewiston, ME • City of Manchester, NH • City of Meriden, CT • City of New Britain, CT • City of New London, CT • City of Rochester, NH • City of Springfield, MA • City of Torrington, CT • City of Waterbury, CT • Town of Beacon Falls, CT • Town of Berlin, CT • Town of Bloomfield, CT • Town of East Hartford, CT • Town of Enfield, CT • Town of Farmington, CT • Town of Greenwich, CT • Town of Hamden, CT • Town of Hampton, NH • Town of Hunter, NY • Town of Madison, CT • Town of Morris, CT • Town of New Milford, CT • Town of Pawling, NY • Town of Redding, CT (since 1984) • Town of Salem, NH • Town of Scarborough, ME • Town of Shandaken, NY • Town of Southbury, CT (since 1985) • Town of Southington, CT • Town of South Windsor, CT • Town of Trumbull, CT • Town of Wallingford, CT • Town of Waterford, CT • Town of West Hartford, CT • Town of West Springfield, CT • Town of Windsor, CT • Town of Woodbury, CT • Town of York, ME • Androscoggin Transportation Resource Center (ME) • Capitol Region Council of Governments (CT) On-Call Services SLR offers on-call, task-based, and as-needed consulting services to municipalities, state government and county agencies, public and private utilities, and regional transportation and planning organizations. Our range of services provided includes survey and design; traffic, planning and economic studies; construction administration and inspection; peer reviews for development plans and permit applications; and technical support for local commissions and land use boards. • Chittenden County Regional Planning Commission (VT) • CT Dept. of Administrative / Construction Services • CT Dept. of Transportation • Delaware County Soil & Water Conservation District (NY) • Eversource • Greater New Haven WPCA • MA Dept. of Conservation & Development • MA Dept. of Ecological Restoration • MA Dept. of Transportation • ME Dept. of Transportation • Metropolitan Council of Governments (CT) • Metropolitan District Commission • Naugatuck Valley Council of Governments (CT) • Northwest Regional Planning Commission (VT) • Norwich Public Utilities • NYC Dept. of Environmental Protection • NYS Office of General Services • Portland Area Comprehensive Transportation System (ME) • South Central Regional Council of Governments (CT) • University of Connecticut • VT Agency of Transportation • VT Dept. of Natural Resources The following represents current and recent clients for which SLR has furnished on-call services.
Page 509
PROJECT PROFILE Making Sustainability Happen SLRCONSULTING.COM CLIENT SERVICES • Transportation Engineering • Transportation Planning • Landscape Architecture • Water & Wastewater Engineering • Construction Engineering & Inspection • Structural Engineering • Water Resources Engineering • Geotechnical Engineering • Environmental Engineering • Surveying City of Waterbury, CT While SLR has served the city of Waterbury for more than 30 years, in 2021 the firm was engaged via a multiple-year “On-Call” agreement to provide planning, engineering, and construction services on behalf of Public Works/Engineering, Board of Ed., Water Department, and Waterbury Development Corp. Given the timing of ARPA and ESSER programs, SLR has enjoyed tremendous collaboration and repeated success across the city. Our teams have supported the city and WDC on successful grant applications for numerous projects. Most recently, our experience includes: • Complete Streets/transit connectivity enhancements throughout Downtown; East Main, North Main, South Main, and Bank Streets • Water and sewer replacement and upgrade projects throughout the Downtown; making public Wi-Fi and fiber optic in available throughout • Renovations to six fire stations • Replacement and upgrade for the city’s three potable water pumping stations. • Replacement of city pools at Hamilton Park; Washington Park and Fulton Park • Replacement of all 27 city and school playgrounds • Library Park, MLK Park, Fulton Park, Lakewood Park, Carrington School Learning Park, Chase Park, Municipal Stadium lighting • City Hall and Prospect Street Parking Lots and EV Charging • City-wide paving, Naugatuck River Greenway construction inspection • 909 Bank and Anamet parcel environmental due diligence • Various bridge inspections, grant applications, and design • Various intersection safety improvement projects across the city • Miscellaneous planning/zoning application peer reviews On-Call Engineering Services WATERBURY, CT Library Park Exchange Place “Complete Streets” Hamilton Park Pool
Page 510
PROJECT PROFILE Making Sustainability Happen SLRCONSULTING.COM CLIENT SERVICES • Survey • Planning • Engineering • Environmental • Geotechnical • Landscape Architecture • Planning & Zoning Reviews • Wetland Commission Assistance • Construction Administration • Road Maintenance Advisory Town of Beacon Falls, CT Technical support services provided under this contract include all facets of municipal engineering. Our services are integrated with the various town departments and land use commissions, especially the Office of the First Selectman, Department of Public Works, Planning & Zoning Commission, and the Inland Wetlands and Watercourses Commission. Assignments include: Roadway, Utility, & Infrastructure Analysis & Design • Pavement rehabilitation analysis, horizontal and vertical geometric improvements • Structural design, assessment, and inspection including bridges/ culverts • Sanitary sewer rehabilitation and replacement • Hydrologic and hydraulic storm water analysis Public Recreation & Park Facilities • Review of Beacon Falls Recreation Complex • Recommendations, design and implementation for basketball courts, pickleball courts, trails, parking lots, etc. Environmental Permitting & Compliance • Municipal stormwater sampling and reporting • Regulatory permitting for municipal and economic development projects • Wetland delineation, assessment, and restoration Capital Improvement Planning • Grant application assistance with state and federal funding programs • Technical assistance and support with redevelopment initiatives Road Maintenance Advisory & Inspection • Review of town roads and preparation of a road maintenance program • Assistance with chip and fog sealing application requirements and inspection • Recommendations for mill and overlay, reclamation, and/or full- depth roadway reconstruction Town Commission Reviews & Technical Assistance • Planning & Zoning meeting attendance and site plan reviews and remediation assistance • Inland Wetlands and Watercourses meeting attendance, plan reviews, and remediation assistance On-Call Engineering Services BEACON FALLS, CT
Page 511
PROJECT PROFILE Making Sustainability Happen SLRCONSULTING.COM General Municipal Engineering Assistance • Property investigations, topographic/boundary survey, erosion control inspections • Residential development and site plan reviews • Building Inspections Construction Inspection • Roadway, drainage, utility, recreation, demolition • Private, municipal, & state federally funded projects SLR has worked on the following list of projects over the course of the on-call contract with the Town of Beacon Falls. Projects • Town-wide Boring Program • Paving Program Management - Randall, Hillside, Stoddard, Jane, Lady Slipper, Columbine, Nyumph, Hockanum Glen, Avenue C, Avenue D, Avenue E, part of Feldspar • Beacon Valley Road Rehabilitation • Beacon Valley Road Bridge Rehabilitation • Pent Road Park - Basketball & Pickleball Courts • Cook Lane Drainage and Road Rehabilitation • Patricia, Dolly, and Coventry Road Rehabilitation • Burton Road Sewer and Road Rehabilitation • Church Street Rehabilitation On-Call Engineering Services Beacon Falls, CT
Page 512
PROJECT PROFILE Making Sustainability Happen SLRCONSULTING.COM CLIENT SERVICES • Survey • Planning • Engineering • Permitting • Structural Inspection • Landscape Architecture • Environmental • Construction Administration Town of Enfield, CT The firm has provided on-call engineering services to the Town of Enfield since 2010. A sampling of projects completed under this on-call contract include: Enfield Roads Reconstruction: • Designed 18 roadways funded under a $20 million bond package and provided full-time construction administration services. The project assignment included roadway reconstruction and paving, sidewalk and intersection improvements, and incidental work such as resetting structures, pavement markings, and maintenance and protection of traffic. Freshwater Pond Streetscape Improvements: • Provided survey, design, and regulatory permitting for approximately 1,400 feet of streetscape improvements including removal and reconstruction of existing multi- use trail, implementation of root protection, installation of ornamental lighting and provision of park benches, trash receptacles, and other amenities. Armed Services Memorial Design Concept Planning: • Performed feasibility study and design of a memorial at two locations on the town green, with services including the development of two alternate memorial concepts, a conceptual site plan and conceptual memorial sketches (including elevations, thumbnail perspectives, etc.). Former CT Valley Oil Property Pre-acquisition Due Diligence Investigations: • Conducted a Phase I Environmental Site Assessment (ESA) for the parcel located at 325 Hazard Avenue in Enfield, Connecticut. The Phase I identified areas of potential environmental concern associated with past land usage. SLR recommended and performed a Phase II Environmental Site Assessment that involved the collection of soil and groundwater samples from the areas of potential environmental concern. The results were communicated to the Town of Enfield on an expedited basis. Shannon Drive/Kelly Drive Drainage: • Completed design and permitting activities associated with a project originally initiated by Town Engineering. Project included development of contract documents for construction of a stone access road and proposed drainage structures, piping, and a riprap channel to mitigate existing erosion. On-Call Engineering Services ENFIELD, CT
Page 513
References References 1. Windsor High School Tennis Court Replacement, O’Brien Stadium Turf Replacement, Welch Park Tennis and Pickleball Courts, L.P. Wilson Community Center Tennis and Pickleball Courts Organization Name: Town of Windsor, CT Engineering Name: Jenna A.W. Zinky Role: Assistant Town Engineerr Email: zinky@townofwindsorct.com Phone Number: (860) 331-3151 mobile 2. Stamford High School Turf Ballfields, Stamford High School Turf Field Replacement, Westfield High School Turf Replacement, Scalzi Park Tennis, Pickleball, and Bocce Courts, Rippowam Middle School Track Organization Name: City of Stamford, CT Engineering Name: Ralph Martin Role: Project Manager Email: martin@stamfordct.gov Phone Number: (203) 223-1674 mobile 3. Westfield High School Sports Complex Organization Name: City of Westfield, MA Name: Tammy Teft Role: Chief Procurment Officer Email: t.teft@cityofwestfield.org Phone Number: (413) 572-6254
Page 514
Section 4
Page 515
Landscape Architecture John Hammer, PLA Glen Martin, PLA James Marchetti Geotechnical Engineering Marie Bartels, PE Katie Reed, EIT Survey Michael Mansfield, LS Greg Szyszkowski, LS Water & Wastewater Engineering Civil Engineering Ryan McEvoy, PE Andrew Goralski, PE Molly Berardi, PE Town of Granby Principal-in-Charge Michael Doherty, PLA Project Manager / Athletics Specialist Kevin Fuselier, PLA, LEED GA Organization Chart Subconsultants: 1SG Engineering, LLC Electrical Engineering 1Steve Gendreau LEP Scott Bristol, LEP, PG Structural Engineering Kishor Patel, PE Shelley Plude, PEThomas Knowlton, PE
Page 516
Michael T. Doherty, PLA North America Practice Leader, Landscape Architecture | Cheshire, CT Michael Doherty serves as the North America Practice Leader, Landscape Architecture. With over 20 years of experience in the fields of landscape architecture, horticulture, and forestry, Mike blends the natural and man-made environments by balancing creative context-sensitive approaches with solid technical detailing to create accessible and engaging public spaces. Much of Mike’s career has focused on expanding community access to outdoor spaces to promote healthy lifestyles, active and passive recreation, and the enjoyment of the community resources where we live, work, and play. Mike leads teams and projects of all sizes and complexities from inception through construction. Years of Experience 21 years with the firm | 1 year with other firms Professional Registrations • Landscape Architect - CT, NY, CO Education • MLA, Landscape Architecture, State University of New York, College of Environmental Science & Forestry • BS, Urban Forestry & Landscape Horticulture, University of Vermont Project Experience Pat Kidney & Woodrow Wilson Track & Field Facilities, Middletown, CT Project Manager for a 15-acre park renovation that included the construction of multiple athletic facilities. The project included multiple sports fields, irrigation systems, basketball courts, 2 concession/ restroom/storage buildings, 500-seat bleachers, 100-vehicle parking lot, playground, athletic field sports lighting, walking trails, landscaping, and site security systems. Middletown Athletic Fields & Parks Evaluation, Middletown, CT Project Manager for the evaluation of 17 athletic field and park sites. The evaluation included quality of the fields, safety, and accessibility. Recommendations for each site were made and incorporated into a capital improvement plan that included proposed graphics to engage the public. Middletown Tennis Facility, Middletown, CT Project Manager responsible for the design and construction of an outdoor six court post-tension concrete tennis facility for the City of Middletown. Other site enhancements include invasive vegetation removal, native landscaping, rain gardens, and streambank improvements. Choate Rosemary Hall Athletic Fields, Wallingford, CT Provided landscape architecture services for a new entry plaza and landscaping associated with a natural turf JV baseball field and two multiuse, state-of-the-art synthetic fields. Revitalization of Bristol Parks, Bristol, CT Conducted a comprehensive vegetative analysis and prepared a summary report for the 100+ acre Rockwell Park. Riverside Park, Westport, CT Principal-in-Charge overseeing the redevelopment of the 6.5 acre park on the Saugatuck River. Improvements include improved and accessible walking paths, parking, and waterfront access; site amenities; native landscaping; and stormwater management infrastructure. Memorial Park Feasibility Study, Hoosick, NY Principal in Charge assisting the Village of Hoosick Falls in determining the potential for a public park
Page 517
Michael T. Doherty, PLA North America Practice Leader, Landscape Architecture | Cheshire, CT on a former factory site. SLR engineers and Landscape Architects reviewed previously prepared ESA reports and closure documents to ensure all proposed public improvements could meet the environmental restrictions of the site. Selected improvements included expanded parking, entry gateway, event lawn, play structures, open-air pavilion, and trail access within the 8 acre site. Norwich Waterfront Improvements, Norwich, CT Principal-in-Charge of overseeing the redesign and reintegration of the City’s waterfront into a vibrant, community-focused downtown asset that will drive and support outdoor recreational access, multi- generational activities, community events, and economic development. SLR is currently leading a multi- disciplinary team to assist the city in allocating 7 million dollars in grant funding towards waterfront improvements including a play fountain and skating ribbon, multi-faceted park gateway, bandshell, and event lawn. Services include master planning, public engagement, detailed design, permitting and construction oversight. Garvan Point Improvements, Madison, CT Principal Landscape Architect responsible for overseeing the integration of park and beach user improvements combined with structural and resilient seawall upgrades for 500 feet of shoreline. Waterbury Parks Citywide, Waterbury, CT Principal-in-Charge for city-wide park improvements including master planning, detailed design, public engagement, permitting assistance, and construction oversight. Hamilton Park Master Plan and Phase One Design, Waterbury, CT Principal-in-Charge for the redevelopment of the city’s historic 94-acre park. Soliciting public outreach and stakeholder engagement, coupled with reimagining the park for current and future uses, were cornerstones of the project. The master plan led to the first detailed design project of a new pool, bathhouse, and pedestrian promenade which opened in the summer of 2024. Veterans Memorial Park Redevelopment, Middletown, CT Principal-in-Charge leading a multi-firm team from visioning through construction for a new 6 lane lap pool, zero-entry activity pool, 2,500 square foot splash pad, bathhouse renovations and additions, open- air pavilions, plazas, and improved vehicular, pedestrian, and bicycle accessibility. Library Park, Waterbury, CT Project Manager for the renovation planning and Phase 1 construction drawings of the iconic Library Park in downtown Waterbury, CT. Designed by Calvert Vaux and the Olmstead Brothers, Library Park is a historic park and contributing site to the nationally registered Historic Downtown District of Waterbury. Improvements and renovations included a new urban plaza, renovated walking paths, a fiber-reinforced great lawn for expanded event use, support infrastructure upgrades, and robust landscaping. All improvements are focused on highlighting the historic character of the site while inviting more daily users into the park to continue efforts in energizing the downtown of Waterbury. Harbor Park, Middletown, CT Project Manager for the redevelopment of 1,600 linear feet of riverwalk and park amenities including walk connections, seating, art, and renovated river-front restaurant patio. Memberships and Associations • Council of Landscape Architects Registration Board (CLARB) • American Society of Landscape Architecture • Society of Ecological Restoration (SER) • Sigma Lambda Alpha, Nu Chapter National Landscape Architecture Honor Society
Page 518
Kevin Fuselier, PLA, LEED GA Team Leader, Landscape Architecture | Cheshire, CT Kevin Fuselier is a Team Leader for SLR’s Landscape Architecture group. He is a nationally recognized Senior Principal Landscape Architect with a strong focus on the planning and design of athletic facilities that elevate performance, community engagement, and environmental stewardship. With extensive experience in master planning, site design, detailing, and construction documentation, Kevin leads complex projects ranging from collegiate and municipal sports complexes to multi-use recreational fields and greenway systems. A licensed Landscape Architect and LEED Green Associate, he brings deep industry knowledge and a nuanced understanding of athletic programming, safety standards, and user experience. His compelling communication and collaborative approach make him a trusted partner to clients, engineers, and stakeholders across the sports design landscape. Years of Experience 19 years with the firm | 4 years with other firms Professional Registrations • Landscape Architect - CT, ME, NH, RI, NY, PA • LEED Green Associate • Post-Tension Institute (PTI) Level 1 - Slab-on-Grade Certified Inspector Education • BS, Landscape Architecture, University of California - Davis • Japanese Garden & Architecture Workshop, Kyoto University • GIS Professional Certification, University of New Haven Project Experience Amherst-Pelham Regional High School, Amherst, MA Directed full project lifecycle services—including investigation, design, permitting, bidding, and construction—for a new running track and field facility, two high-performance natural grass multipurpose fields, ADA-compliant parking and walkways, irrigation systems, and LED field lighting. Southington High School Running Track, Southington, CT Served as Lead Landscape Architect providing technical oversight and design guidance to the Project Manager throughout the development of site plans and construction documentation. Responsibilities included reviewing grading and drainage strategies, ensuring ADA compliance, refining layout efficiency, and coordinating with civil and architectural teams to maintain design integrity and performance standards. Supported quality control and design resolution to ensure alignment with project goals and regulatory requirements. Stamford High School, Stamford, CT Directed investigations, design, bidding, and construction-phase services for the development of a synthetic turf baseball / multipurpose field and a synthetic turf softball field. Sacred Heart University, Fairfield, CT Provided design and construction-phase services for the contractor-led reconstruction of a synthetic turf field. Sheehan High School, Wallingford, CT Managed design, bidding, and construction-phase services for the replacement of a synthetic turf field and reconstruction of a running track.
Page 519
Kevin Fuselier, PLA, LEED GA Team Leader, Landscape Architecture | Cheshire, CT Middletown High School Track and Field, Middletown, CT Oversaw design, bidding, and construction-phase services for the replacement of a synthetic turf field and reconstruction of a running track. Quinnipiac University Baseball Field, Hamden, CT Led design, permitting, and construction-phase services for the conversion of a natural grass baseball field to synthetic turf. Additional upgrades included new dugouts, batting cages, and bullpens. Lyme–Old Lyme High School, Old Lyme, CT Project Manager overseeing investigation, design, permitting, bidding, and construction-phase services for a synthetic turf multipurpose athletic field and an elevated grandstand spectator seating area. Portland High School Running Track, Portland, CT Managed design, bidding, and construction-phase services for the installation of a post-tensioned concrete running track. Laurel Beach Association Pickleball & Tennis Courts, Milford, CT Oversaw design, bidding, and construction-phase services for three post-tensioned concrete tennis courts and four pickleball courts. Longbrook Park Tennis Courts, Stratford, CT Directed the removal of two clay tennis courts and construction of four new post-tensioned concrete courts with integrated LED lighting. Westfield High School Tennis Courts, Westfield, MA Supported design, bidding, and construction-phase services for the replacement of six asphalt tennis courts with post-tensioned concrete courts and surrounding amenities. Welch Park Tennis Courts, Windsor, CT Led a design / build transformation of aging asphalt tennis courts into a modern complex featuring post-tensioned concrete pickleball and tennis courts, a custom shade structure, and sound barrier wall. L.P. Wilson Community Center Pickleball & Tennis Courts, Windsor, CT Provided procurement and construction oversight for a design / build project replacing asphalt tennis courts with post-tensioned concrete pickleball and tennis courts, plus a shade structure and sound barrier wall. Simsbury High School Tennis Courts, Simsbury, CT Directed design, permitting, bidding, and construction-phase services for the replacement of six asphalt tennis courts with post-tensioned concrete courts and site amenities. Loomis Chaffee School Tennis Courts, Windsor, CT Tennis court specialist responsible for conceptual designs, final designs, and preparation of construction documents for 12 tennis courts. Analyzed multiple sites for new court construction and prepared an alternative analysis for the selected sites. Due to the accelerated design schedule to complete courts before the upcoming season, bid documents were prepared for both asphalt base and post-tension concrete-based construction. Clint Frank Field at Yale University, New Haven, CT Project Manager providing design services for the conversion of a natural grass field to synthetic turf. Long jump / triple jump and pole vault runways and shot-put event areas were reconstructed to accommodate the new field. Memberships and Associations • Sports Turf Manager’s Association (STMA) • New England Sports Turf Manager’s Association (NESTMA) • American Sports Builders Association (ASBA) • Council of Landscape Architectural Registration Boards (CLARB) • Member, Synthetic Turf Council (STC)
Page 520
John J. Hammer, PLA Team Leader, Landscape Architecture | Agawam, MA John Hammer is a Team Leader for SLR’s Landscape Architecture group. His project experience includes streetscapes, bikeways and greenways, multifamily housing, commercial design, golf courses, dam removals, park and recreational facilities, and waterfront improvements. John’s other related experience includes photo simulations of concepts for bridge replacements; pier and dock replacements; sidewalks; lighting, trees; parking; signage; and various trail enhancement, location, and impact simulations. He is adept at Autodesk Civil 3D and Autodesk Infrastructure Design Suite Premium and has experience with MassDOT CAD standards. He is familiar with both MassDOT and CTDOT Design Guides and Standard Specifications. Years of Experience 24 years with the firm | 5 years with other firms Professional Registrations • Landscape Architect - CT, MA Education • BLA, Landscape Architecture, State University of New York • AAS, Horticulture Landscape Design, State University of New York Project Experience Westfield High School Fields, Westfield, MA Project Manager responsible for staff oversight, design coordination, and project deliverables for the renovation of a running track and synthetic turf field, including bleachers and a concessions / restroom building, as well as a synthetic turf softball field and a synthetic turf practice field. Managed all project financials, including invoicing, scope amendments, and vendor payments. Acted as the primary point of contact among the owner, project team, and subcontractors. Conducted field observations, addressed design adjustments and owner-requested scope changes, and reviewed contractor pay applications and submittals. Simsbury Tennis Courts, Simsbury, CT Lead Landscape Architect responsible for preparing bid documents for reconstructing asphalt tennis courts. Clinton Tennis Courts, Clinton, CT Prepared regulatory approval drawings for Town review of asphalt tennis courts. Enfield High School Athletic Field Natural Grass Drainage Improvements, Enfield, CT Landscape Architect and Project Manager for the design and oversight drainage improvements to 8.3 acres of athletic fields with poorly draining and usage restricted conditions. At times, portions of the fields would be unusable for weeks with 4 inches of standing water. A hierarchy of drainage including hard piping ranging for 2 inches up to 4” were installed to intercept sand slit drains on the entire facility. Longmeadow Parks and Recreation Masterplan, Longmeadow, MA Landscape Architect and Project Director responsible for the overall content and delivery of the project. Also responsible for the athletic field demand analysis, field assessments, field recommendations, and maintenance costs. Powder Hollow Baseball Diamond, Enfield, CT Landscape Architect and Project Manager for the design and oversight during reconstruction the Enfield High School Varsity Baseball Diamond. The project included design of additional parking, access
Page 521
John J. Hammer, PLA Team Leader, Landscape Architecture | Agawam, MA improvements, irrigation, drainage, concessions and restrooms building. Tasks included landscape design, site grading, stormwater management, construction documents, bid documents, addenda, RFI’s, change orders, irrigation controller programming, and post construction reporting. The project funding was limited to reconstructing the field. Wolf Swamp Fields, Longmeadow, MA Landscape Architect and Project Manager for the reconstruction of 10-acres of multi-purpose fields, 60’ and 90’ ball diamonds, additional parking, access improvements, signage, irrigation, drainage, and 1-year of post-construction monitoring of field use. Tasks included landscape design, site grading, stormwater management, construction documents, bid documents, addenda, RFI’s, change orders, irrigation controller programming, and post construction reporting. Enfield Athletic Field Demand Analysis, Enfield, CT Landscape Architect and Project Manager for the Athletic Field Demand Analysis and recommendations of field changes. All of the athletic facilities were mapped using NEARMAP Aerials and the potential field layouts provided at each site. All of the youth groups, leagues, and the School Athletic Director proved usage data and schedules to input into our internally developed proprietary analysis program. Recommendations were provided to the Town Council and School Athletic Director resulting in the removal of two (2) ball diamonds at the high school for the creation of rectangular fields based on a lack of field space for rectangular fields and over supply of ball diamonds Ruth Elizabeth Soccer Field, Springfield, MA Landscape Architect and Project Manager for the reconstruction of full size natural turf soccer field. Improvements include leveling a field that ran uphill in one direction to a traditional crowned field, drainage improvements, sod, additional parking, ledge removal for site line improvement into the facility, access and entry statement landscaping with a solar lit flagpole. Agawam Sportsplex, Agawam, MA Provided design services for an indoor / outdoor soccer complex. The facility includes two full-size synthetic turf soccer fields with air-supported structure enclosures, a prefabricated 160’ x 80’ Accessory Building, and a gravel parking area to accommodate approximately 200 vehicles. Tasks included landscape design, site grading, stormwater management, and parking. Agawam High School Track Facility Master Plan, Agawam, MA Landscape Architect and Project Manager for the award-winning master planning and, design, and construction oversight for improvements to Agawam High School’s athletic facilities and locker rooms. Improvements including a new running track and synthetic turf field with lighting, a new baseball diamond, enlarged and renovated practice fields, a new softball diamond, new post tensioned concrete four tennis courts incorporating a basketball court with lighting, relocation of new bleachers, new concessions / restroom facility / storage building, renovation of a unique two-story press box, additional parking, and renovated locker rooms expansion. Mary Lynch School Soccer Field Improvements & PARC Grant Application, Springfield, MA Provided design services to assist the city in master planning two memorial soccer fields and a Memorial Plaza at Mary Lynch Fields. The fields are in memorial to Officers Schiavina and Beauregard. The facility is to be named Schiavina and Beauregard Memorial Soccer Complex. Enrico Fermi High School, Enfield, CT Prepared regulatory and construction drawings for the soil remediation and construction of a synthetic track and football field, bleachers, softball, and baseball fields. Cheshire Academy, Cheshire, CT Prepared AutoCAD drawings for layout, grading, and drainage of soccer field for Town review.
Page 522
Glen Martin, PLA Senior Landscape Architect | Cheshire, CT Glen Martin is a Senior Landscape Architect with 34 years of experience in Landscape Architecture including preparation of site plans and construction plans for projects including industrial, commercial, and residential developments; municipal and educational facilities; parks and athletic fields; affordable housing; and vehicle circulation. He has worked in team environments with architects and engineers to produce high-quality designs and plans. Glen previously worked at SLR, then known as Milone & MacBroom, Inc., as a Landscape Architect where he was responsible for developing site plans and presenting projects at local commission meetings. Years of Experience 2 years with the firm | 32 years with other firms Professional Registrations • Landscape Architect - CT, MA, RI Education • BS, Landscape Architecture, Pennsylvania State University Project Experience Middletown Track and Field Renovation, Middletown, CT Assisting with Construction Administration for the renovation of the running track and athletic field at Middletown High School. Martha Hunt Park, New Britain, CT** Renovation of existing Little League field. Developed layout and grading plans. Keney Park Ball Fields, Hartford, CT** Renovation of baseball field, softball field, and two Little League fields. Pleasant Valley School Project, South Windsor, CT** Assisted with the site plans for the Pleasant Valley Elementary School located on Ellington Road in South Windsor, CT. Moriarty School Project, Norwich, CT Currently working on the site plans for the Moriarty Elementary School located on Lawler Lane in Norwich, CT. Uncas School Project, Norwich, CT Currently working on the site plans for the Uncas Elementary School located on Elizabeth Street Extension in Norwich, CT. Highland Avenue Housing Project, Cheshire, CT Currently working on the grading plan for the Metro Realty Group 71-unit mixed-income housing development located on Highland Avenue in Cheshire, CT. New Britain Avenue Housing Project, Farmington, CT Developed the grading plan for the Metro Realty Group 91-unit mixed-income housing development located at 1690 New Britain Avenue in Farmington, CT. Railroad Square Development, Torrington, CT Assisted with the grading plan for a parking lot for the ongoing Railroad Square Revitalization project in downtown Torrington. **Denotes experience completed at another firm
Page 523
James Marchetti Project Landscape Designer | Cheshire, CT James Marchetti is a Project Landscape Designer with over a decade of experience in residential and commercial landscaping, leading projects from concept through installation, and consistently achieving annual sales targets of $750K. Jimmy brings a strong foundation in site analysis, horticulture, and hardscaping, supported by technical skills in CAD, project management, and construction documentation. He previously owned a successful landscaping business and has a background in IT as a network administrator. Jimmy is currently pursuing an associate degree in Landscape Design at Naugatuck Valley Community College, where he has earned Dean’s List honors and completed a Landscape Design Certification. Passionate about sustainable design and client collaboration, Jimmy is committed to delivering visually compelling and environmentally responsible landscapes. Years of Experience <1 year with the firm | 14 years with other firms Education • AS, Landscape Design, Naugatuck Valley Community College (expected Summer-Fall 2026) • Landscape Design Certification, Naugatuck Valley Community College Project Experience John Toro Sports Complex & Beach Volleyball Courts, Torrington, CT Supporting project development through site design and layout work for the new athletic and recreation areas. Notre Dame Prep of Sacred Heart University Track Improvements, Fairfield, CT Assisting with site design tasks and helping organize the overall layout for planned track improvements. Amesbury High School Track & Field, Amesbury, MA Supporting overall project updates by refining design concepts, updating the site layout, and creating visual renderings to help communicate the proposed improvements. North Adams Little League Field Relocation, North Adams, MA Assisting with site design tasks and organizing the overall layout for the new facility. Eli Whitney Elementary School Site Alterations, Stratford, CT Assisting with site design and layout development for site alteration work at Eli Whitney Elementary School. Stafford Road, Burlington, CT Provided support for overall site design and landscape layout. Winterberry Gardens, Southington, CT** Designer responsible for creating distinct and visually stunning landscape designs. Performed site analysis of plants and soil conditions, and also performed survey of work sites. Led teams in design, construction, material procurement, and installation of retaining walls, pavers, drainage, lighting, and plantings. Also led meetings between designers and account managers to boost productivity. Freelance Landscaping, Various Sites, CT** Started and grew the company, performing landscape maintenance and design services. Awards • Westport Garden Scholarship • Waterbury Garden Club Scholarship **Denotes experience completed at another firm
Page 524
Marie Bartels, PE Senior Geotechnical Engineer | Cheshire, CT Marie Bartels is a Senior Geotechnical Engineer with experience in foundation design, administering subsurface explorations, earthwork and foundation specifications, and construction-phase services for roadway, bridge, building, and retaining wall foundations. She has experience preparing recommendations using ASHTO LRFD design code and has managed multimillion-dollar CTDOT projects in the geotechnical design and construction phases. Marie is also familiar with planning, design, and construction-phase services for small and intermediate development projects. Years of Experience 10 years with the firm | 14 years with other firms Professional Registrations • Professional Engineer - CT Education • MS, Environmental Engineering, University of New Haven • BS, Civil Engineering, Northeastern University Project Experience Pat Kidney and Woodrow Wilson Fields, Middletown, CT Geotechnical Engineer responsible for coordinating and administering subsurface explorations consisting of 11 borings. Prepared a geotechnical engineering report that contained recommendations appropriate for the design and construction of concession stands, bleachers, grass fields, basketball courts, tennis courts, retaining walls, and parking areas. Simsbury High School Athletic Facility, Simsbury, CT Completed in two phases, Geotechnical Engineer responsible for coordinating and administering subsurface explorations consisting of 22 borings. Prepared a geotechnical engineering report that contained recommendations appropriate for the design and construction of new tennis courts, concession stand, synthetic turf field, and light pole structures. Palmer Field, Middletown, CT Geotechnical Engineer responsible for documenting installation of helical piles adjacent to an existing structure, for the purpose of transferring load from the structure to suitable bearing layer. Deluca Field, Stratford, CT Responsible for coordinating and administering two borings at a failing backstop to be replaced. Thomaston Running Track, Thomaston, CT Geotechnical Engineer on-site during construction operations to provide quality assurance and quality control in accordance with the project specifications. Observed subgrade following grubbing and clearing, provided recommendations to obtain firm subgrades in unfavorable conditions, observed placement and compaction of up to 16-feet of fill, and evaluated site materials for reuse. JCC Camp Settoga, Pomona, NY Responsible for planning and executing a subsurface exploration program of 12 borings for two new tennis courts, two new basketball courts, rehabilitation of parking and driveways, amphitheater canopy foundations, and the relocation of a 24-inch RCP. Prepared a geotechnical engineering report summarizing subsurface conditions, providing geotechnical recommendations, and identifying construction issues.
Page 525
Kaitlin Reed, EIT Project Geotechnical Engineer | Cheshire, CT Katie Reed is a Project Geotechnical Engineer with experience in geotechnical field exploration, review of subsurface data, site characterization, geotechnical analysis, design, and reporting. She has field experience supervising subsurface exploration and field tests as well as observing and documenting various construction activities. Her experience also includes compiling and processing of large data sets for complex, multi-disciplinary projects, research and evaluation of historical site data, organization and analysis of laboratory test results, and geotechnical engineering analysis of bearing capacity, settlement, lateral earth pressures, and seismic hazards. Years of Experience 3 years with the firm | 2 years with other firms Professional Registrations • Engineer-in-Training - CT Education • BS, Civil Engineering and Sustainable Studies, Florida Institute of Technology Project Experience Greeneville Elementary School, Norwich, CT Coordinated comprehensive, two-phase subsurface exploration program for proposed elementary school. Observed 41 borings, 6 bedrock cores, 22 test pits, and oversaw geophysical logging and seismic refraction fieldwork. Adjusted exploration program in the field as needed. Prepared shallow foundation design for proposed building. Developed bedrock topographic map across site to improve accuracy of cost estimations. Assisted in preparation of geotechnical engineering report summarizing subsurface conditions and providing geotechnical recommendations for building foundation, retaining wall, and pavement designs. Summit Place, Branford, CT Observed installation of 524 Rammed Aggregate Piers (RAPs) to improve existing ground conditions for proposed residential development. Observed three modulus load tests to confirm RAP design parameters. Recorded pier locations, installation depths, and aggregate volumes. Provided geotechnical recommendations as needed. Prepared daily field reports and distributed to the project team. Huckleberry Hill Elementary School, Brookfield, CT Provided geotechnical engineering observation and support during construction. Oversaw ground improvement measures within 170,000 square foot parking area. Observed excavation of unsuitable material, provided recommendations as to the extent of unsuitable material removal, estimated the volume of excavated material, and provided recommendations for backfill placement. Prepared daily field reports and distributed to the project team. Proposed Warehouse, Middlebury, CT Completed due diligence investigation for proposed 25-acre warehouse. Observed thirteen borings, recorded soil and groundwater information, and adjusted exploration program in the field as needed. Evaluated suitability of re-using onsite material as fill to facilitate mass grading operations. Performed geotechnical design analysis and provided recommendations for proposed building foundations, parking lots, and retaining walls. Wrote geotechnical report including design recommendations and construction considerations.
Page 526
Michael F. Mansfield, LS Practice Manager, Land Survey | Cheshire, CT As Practice Manager of Land Survey, Michael Mansfield brings extensive surveying experience across Connecticut and eastern New York. His responsibilities include supervising and coordinating the work of field crews, boundary computations, land record searches, GPS calibrations, as-built plans, and the preparation of maps with an emphasis on computer applications including uniting CADD systems with field survey operations. Years of Experience 34 years with the firm | 3 years with other firms Professional Registrations • Land Surveyor - CT, NY Education • BS, Architectural Engineering, Wentworth Institute of Technology Project Experience Cheshire High School, Cheshire, CT Survey services for the replacement of an existing athletic field with a synthetic turf field. Revitalization of Bristol Parks, Bristol, CT Survey services for the preparation of a master plan for the Roberts Property (50 acres) and The Hoppers / Birge Pond (200-acres), as well as the design of improvements to five additional parks. The design improvements include both active and passive recreation improvements. Athletic Field Renovations, Weston, CT Survey and mapping services as part of the master plan for the renovation and expansion of the Town’s athletic fields. Shea McGrath Athletic Complex, Norwalk, CT Survey services for the improvements to the Norwalk High School athletic facilities. Sloper Outdoor Center, Southington, CT Survey services as part of the master plan for 143-acres of land utilized for over 50 years for recreational purposes. Shaker Recreational Facility, Enfield, CT Survey services for the design of two new soccer fields and the realignment and grading of the existing three soccer fields. Tolland High School Track, Tolland, CT Provided survey services in connection with the design for the reconstruction of the running track at Tolland High School. North Branford High School Athletic Facility, North Branford, CT Survey services for the renovation of the school’s running track. Included in the scope of services was the design of a 400-meter synthetic running track and various site improvements. Loomis Chaffee School, Windsor, CT Performed topographic surveys for tennis court design.
Page 527
Scott G. Bristol, LEP, PG Senior Principal Consultant | Land Quality and Remediation | Glastonbury, CT Scott Bristol is a Licensed Environmental Professional who has 36 years of experience including Phase I Environmental Site Assessments; Phase II and III Site Investigations; and remedial action planning, estimating, and performance. His experience also includes real estate restoration and redevelopment, regulatory negotiations, and regulatory interpretation and his focus is on brownfield site reuse/redevelopment. He has been a volunteer member of his local Brownfields Redevelopment Agency and served as both Chairman and Vice-Chairman. He is also a long-time member of Environmental Professionals of Connecticut and the Connecticut Environmental Forum. He has worked closely with national and regional commercial companies and local and state government agencies. Scott is an accomplished Program Manager with a proven ability to effectively organize and lead project teams. Years of Experience 19 years with the firm | 18 years with other firms Professional Registrations • Professional Geologist - NY • Environmental Professional - CT Education • BS, Geology / Geophysics, University of Connecticut Project Experience Evaluation of the Environmental Effects of Synthetic Turf, Multiple Sites, CT Project Manager and principal author of a year-long study of the environmental effects of crumb rubber in-filled synthetic turf athletic fields. This study included the collection of air, water, and material samples for comparison to established risk-based exposure criteria. The study also included an evaluation of the potential for heat transfer from the fields to the air directly above the fields. The study required the derivation of field methodologies for the collection of air samples. Portions of these methods were subsequently adopted by the Connecticut Department of Public Health and the University of Connecticut as well as the New York City Department of Environmental Protection and New York State Department of Environmental Conservation for use in subsequent studies. Evaluation of Environmental Conditions, Multiple Athletic Field Reconstruction Projects, CT & MA Project Director for the evaluation of numerous sites within Connecticut and Massachusetts for the purpose of the development or redevelopment of athletic facilities. Evaluations included studies of current conditions and determinations of potential negative impacts associated with development. Fairfield Country Day School, Fairfield, CT Project team member responsible for the assessment of potential environmental risk posed by an installed synthetic playing field. Work conducted included the collection of water samples and analysis for chemicals of interest. Results supported a finding of no risk. Results were presented to a local agency over several nights of testimony. High School Athletic Field Reconstruction, Enfield, CT Provided overall project support and opinion regarding compliance with a remediation action plan to isolate pesticide containing soils. Worked closely with in-house construction managers to ensure timely acceptance of project approvals thereby enabling achievement of project goals and deadlines.
Page 528
Thomas A. Knowlton, PE Principal Water & Wastewater Engineer | Cheshire, CT Thomas Knowlton brings over 28 years of field and office experience in the project management, planning, design, and construction administration for water and wastewater projects. He has experience in design-bid-build projects of all sizes and has an in-depth understanding of water and wastewater pump stations, rehabilitation of pipelines for both water and sewer systems, and water storage tanks. He has experience in private, municipal, and federal projects including multiple military installations that required background checks and security clearance. Years of Experience 14 years with the firm | 14 years with other firms Professional Registrations • Professional Engineer - CT, NM Education • BS, Civil Engineering, University of New Mexico Project Experience Forman School, Litchfield, CT Designed a restroom facility with concession stand and attached pavilion for the new artificial turf field designed by SLR. Project included design of potable water, sewer, electrical, and local permitting. Hamilton Park Demo and Pool, Waterbury, CT Provided water and sewer Quality Assurance and Quality Control services for the park’s demolition.] Sacred Heart University, Fairfield, CT Performed sewer flow estimate for WPCA approval of new development. Yale University, New Haven, CT Project Manager that performed field investigation and provided recommendations for basement flooding. 1B Interdistrict Magnet School, Stamford, CT Design of new water services for domestic and fire protection in accordance with the City of Stamford and Aquarion Water Company requirements. Designed fire hydrant and valve layout for fire protection around the school. New Lebanon Elementary School, Greenwich, CT Design of new water services for domestic and fire protection in accordance with the Connecticut Water Company requirements. Designed new 1,000 gallon buried grease interceptor for new kitchen facilities and connection to existing town sewer. Adams Middle School, Guilford, CT Designed irrigation pump replacement for sports field irrigation. The new pumping system included an insulated enclosure and a variable frequency drive pump and controls to deliver a range of flows to the spray irrigation system for an existing baseball field with a connection stubbed out for future softball and soccer fields. Waddell Elementary School, Manchester, CT Design of new fire hydrant and water main tap in accordance with the Town of Manchester requirements. Designed new sanitary sewer collection system and connection to existing town sewer. Designed new 1,000 gallon buried grease interceptor for new kitchen facilities.
Page 529
Ryan McEvoy, PE Principal Civil Engineer | Cheshire, CT Ryan McEvoy is a Principal Civil Engineer with 25 years of experience including the design and inspection of sewers and roadways; stormwater design and remediation; culvert design; and municipal reviews. Years of Experience 24 years with the firm | 1 year with other firms Professional Registrations • Professional Engineer - CT Education • BS, Civil & Environmental Engineering, University of Connecticut Project Experience Bates Woods Park, New London, CT Engineering services for the expansion of the parking areas and site improvements. Rentschler Field, East Hartford, CT Performed drainage analysis, culvert design, detailed earthwork analysis, and contaminated soil mitigation in support of large-scale parking and circulation improvements. Powder Ridge Ski Area, Middlefield, CT Design of snowcat access road and culvert crossing. O’Sullivan’s Island, Derby, CT Provided assistance with city staff to obtain state grants for the design and construction of a transient boating facility at the confluence of the Housatonic and Naugatuck Rivers. Greens Farms Academy Athletic Facilities, Westport, CT Provided engineering design services for the renovation of the school’s baseball fields, tennis courts, soccer fields, and indoor squash courts. Bristol Parks Master Plan and Design, Bristol, CT Engineering services in coordination with the design of active and passive park improvements at several city parks. St. Joseph’s College, West Hartford, CT Performed drainage analysis and storm capacities on track improvements and ballfields. Enfield High School, Enfield, CT Site planning services and engineering services associated with the development of a 305,000 square foot high school consolidation including permitting and construction plans and logistical phasing to support the continued use of the school during construction. The site design included a complete redesign of on-site parking and stormwater management as a result of the 120,000 square foot addition. Guilford High School, Guilford, CT Assisted with the site design of a new high school in Guilford, Connecticut, adjacent to the existing high school. Due to site constraints, the new school has to be located within 20 feet of the existing school, and the existing school needed to remain in operation while the new school was constructed. This presented many challenges regarding utility infrastructure, access, safety, phasing, erosion control, and stormwater management on site.
Page 530
Andrew Goralski, PE Associate Civil Engineer | Cheshire, CT Andrew Goralski is an Associate Civil Engineer who facilitates site civil-specific projects that range from preliminary conceptual site plan design to full-scale construction-level design. With a background in surveying as well as being skilled in AutoCAD Civil 3D, Andrew brings a very technical eye to all projects. Years of Experience 11 years with the firm Professional Registrations • Professional Engineer - CT, MA Education • BS, Civil Engineering, University of Connecticut • BS, Environmental Engineering, University of Connecticut Project Experience Westfield Athletic Fields, Westfield, MA Responsible for Civil Engineering and Quality Control and Assurance. Reviewed plans, profiles, watersheds, engineering report, all of the utility design, and redlined plans and specifications. Coordinated details with the plans, specifications, and opinion of cost. Assisted with updating opinions of cost. Amesbury High School Baseball, Amesbury, MA Assisted with Civil Engineering for the ball diamond. Reviewed plans, watersheds, developed plans, and details. Amherst-Pelham School, Amherst, MA Assisted with Civil Engineering for the ball diamond. Reviewed plans, watersheds, developed plans, and details. Stamford High School Multipurpose Synthetic Turf Field, Stamford, CT Assisted in subsurface drainage and storage systems associated with the construction of two synthetic turf fields. Quinnipiac University Baseball Field Improvements, Hamden, CT Aided in subsurface drainage and storage systems associated with converting an existing grass baseball field to synthetic turf. Forman School Synthetic Turf Field, Litchfield, CT Assisted in site layout and design of subsurface drainage and storage systems associated with converting an existing multi-purpose grass field to synthetic turf. Mark T. Sheehan High School Track & Field Improvements, Wallingford, CT Assisted in preliminary design for the replacement of a track and turf field.
Page 531
Molly Berardi, PE Associate Hydrology & Hydraulics Engineer | Cheshire, CT Molly Berardi is an Associate Hydrology & Hydraulics Engineer in the Civil Engineering Department with experience in a variety of civil design projects including athletic fields, public and private site development, educational facilities, and residential housing. Her background includes the design of stormwater flood control solutions and “green” shoreline and streambank restoration solutions. Years of Experience 7 years with the firm | 1 year with other firms Professional Registrations • Professional Engineer - CT, RI, NY Education • M.Eng., Environmental Engineering, Rensselaer Polytechnic Institute • BS, Environmental Engineering, Rensselaer Polytechnic Institute Project Experience Athletic Field Renovation – Greenwich Country Day School, Greenwich, CT Led stormwater management design for the creation of two new athletic fields at Greenwich Country Day School following the Greenwich Stormwater Drainage Manual, including design of infiltration facilities for water quality treatment and retention. Worked with the Town Engineer to develop models allowing for the use of field infiltration rates within the hydrologic models of the site to reduce detention facility footprints. Sacred Heart University Hockey Arena, Fairfield, CT Assisted with stormwater management and drainage design for Sacred Heart University’s new hockey arena. Conducted hydrologic and hydraulic analysis, including watershed delineation, storm drainage design, hydrologic and hydraulic modeling, and design of stormwater detention facilities. Farmington High School, Farmington, CT Led stormwater management and drainage design for the new high school. Conducted hydrologic and hydraulic analysis, including watershed delineation, storm drainage design, hydrologic and hydraulic modeling, and design of stormwater detention facilities. Assisted with CTDOT OSTA drainage certification. Slate Upper School, North Haven, CT Led stormwater management and drainage design for the new upper school. Conducted hydrologic and hydraulic analysis, including watershed delineation, storm drainage design, hydrologic and hydraulic modeling, and design of stormwater detention facilities. Latimer Lane School, Simsbury, CT Led stormwater management and drainage design for the renovation and expansion of Latimer Lane School. Conducted hydrologic and hydraulic analysis, including watershed delineation, storm drainage design, hydrologic and hydraulic modeling, and design of stormwater detention facilities. Proposed Upper Dorm – The Ethel Walker School, Simsbury, CT Led stormwater management and drainage design for the new Upper Dorm at The Ethel Walker School. Conducted hydrologic and hydraulic analysis, including watershed delineation, storm drainage design, hydrologic and hydraulic modeling, and design of stormwater detention facility expansion.
Page 532
Kishor Patel, PE, P.Eng. North America Practice Leader, Structural & Geotechnical Engineering | Cheshire, CT As North America Practice Leader, Structural & Geotechnical Engineering, Kishor Patel has a very diverse and impactful role in structural engineering. His work on bridges, retaining walls, greenhouses, fish ladders, and small dams requires extensive expertise and attention to detail. Conducting structural analysis and inspections for various projects including retaining walls, foundations, bridges abutments, dams, and buildings shows his extensive knowledge and experience in the field. Kishor routinely conducts NBIS-inspections for former railroad bridges and culverts for greenway and trail projects also highlight his commitment to safety and sustainability. Years of Experience 26 years with the firm Professional Registrations • Professional Engineer (PE) - AL, CT, CO, FL, ID, MA, MD, ME, MI, NH, NJ, NY, OR, RI, SC, TN, TX, UT, VT, WA • Professional Engineer (P.Eng.) - AB, BC, ON Education • BS, Civil Engineering, Concordia University Project Experience Rockwell Park Bridge & Building Inspection, Bristol, CT Responsible for performing structure condition inspections for an existing bathhouse and two roadway bridges at Rockwell Park. Windsor High School Tennis Courts, Windsor, CT Structural Engineer that assisted with design for the replacement of existing asphalt tennis courts and the addition of 6 new tennis courts. Memorial Park Tennis & Pickleball Courts, Bethlehem, CT Structural Engineer who assisted with design to replace the existing bituminous tennis courts and upgrading the adjacent parking lot and entry drive. Holmes Playground Dam Removal, Town Brook Restoration, and Newfield Street Bridge, Plymouth, MA Project Manager responsible for the design of the Newfield Street Bridge as part of the removal of Holmes Dam and restoration of the stream and adjacent playground park on Town Brook. Chase Park, Waterbury, CT Structural Engineer that assisted with design for the reconstruction of six tennis courts utilizing post- tensioned concrete for improved durability and performance. Shea-McGrath Athletic Complex, Norwalk, CT Provided structural design for improvements to the Norwalk High School athletic facilities. The project included a new all-weather surface track, a synthetic-surfaced multiuse athletic field, six tennis courts, relocation and code update of bleachers (home side only) now located at Andrews Field, field lighting, a new concession / rest room / storage building, expansion of on-site parking, provisions for a new emergency access roadway, walkways, landscaping, and utility infrastructure support facilities. High School Athletic Field Reconstruction, Enfield, CT Provided engineering services for the design of bleachers and the foundation for a scoreboard update of 35 acres of playing fields at Enfield High School and Fermi High School.
Page 533
Shelley Plude, MS, PE Principal Structural Engineer, Bridge Design Lead | Cheshire, CT As a Principal Structural Engineer, Bridge Design Lead, Shelley is responsible for structural calculations and analysis, preparation of construction documents, existing conditions inspections/reports, structural type studies, and day-to-day project management on a variety of bridge projects including municipal, state, and federally funded rehabilitation, superstructure, and full bridge replacements. Other projects include retaining walls and bulkheads, pedestrian facilities, and dams and fishways. While completing her master’s at the University of Connecticut, she served as a graduate research assistant responsible for conducting research in the field of damage detection as a part of the bridge health monitoring program. Years of Experience 14 years with the firm Professional Registrations • Professional Engineer - CT, ID, MA, ME, NH, NY, OR, VT, WA • New Hampshire DOT LPA Certified Education • MS, Structural Engineering, University of Connecticut • BS, Civil Engineering, University of Connecticut Project Experience Meriden Green Pedestrian Bridges, Drainage Improvements & Site Remediation, Meriden, CT Provided engineering services for a 300 foot, multi-span pedestrian bridge, eight retaining walls up to 200 feet long including a utility room for park facilities, two pedestrian footbridges, and culvert headwalls for the redevelopment of a 14-acre site in downtown Meriden as a part of the Harbor Brook Flood Control Project. The extensive retaining walls were needed to provide pedestrian access and connectivity between surrounding businesses and the neighboring Amtrak train station across the new Harbor Brook channel and flood storage area. Other tasks included inspection of the existing Harbor Brook culvert, the preparation of structural plans and design calculations, and cost estimating. Construction phase services included construction administration and shop drawing review as well as part-time construction inspection services. Ledgebrook Condominiums – Timber Boardwalk Replacement, Norwalk, CT Provided engineering and design services for the replacement of a timber boardwalk at Ledgebrook Condominiums in Norwalk, CT. Tasks included the inspection of existing conditions, preparation of construction documents, and cost estimation. City Point Yacht Club, New Haven, CT Prepared preliminary design plans and permit drawings for a sheeting project at the City Point Yacht Club in New Haven. Tasks included the design of steel sheet piling and tiebacks, preparation of preliminary design plans, and cost estimating.. Fuessenich Field Bleacher Replacement, Torrington, CT Prepared structural plans and details for the replacement of wooden bleachers at Fuessenich Field. Berry Field Type Study, Spartanburg, SC Prepared a type study for Berry Field Park in Spartanburg, SC. Tasks included the evaluation of the existing concrete bleachers and the development of several rehabilitation and replacement alternatives.
Page 534
Background Mr. Gendreau has over fifteen years of experience in the MEP consulting industry as an electrical engineer and manager. He has designed and overseen a wide variety of infrastructure, building & energy projects throughout his career, in roles spanning from junior electrical engineer to Vice President of a large multi- discipline engineering firm. He has designed and managed some of the largest projects built in Connecticut and Massachusetts, and has a specific passion for renewable energy systems, having personally overseen the design of over 250 megawatts of photovoltaic systems. The part of design that Steve enjoys most is solving complex electrical engineering projects while incorporating on the client’s needs. He enjoys the challenge of finding solutions that strike a delicate balance between being cost conscious, code compliant and maintainable. Mr. Gendreau founded SG Engineering, LLC in 2017. Education Bachelor of Science, Electrical Engineering, University of Connecticut, Storrs, CT, 2005 Professional Engineering Licenses ▪ Connecticut #27497 ▪ Massachusetts #49055 Steve Gendreau, P.E. Southington, CT sgedesign.com 203-215-9448
Page 535
Section 5
Page 536
Services Expected of the Town Services Expected of the Town The Town shall provide a backhoe/excavator and operator to dig test pits, if necessary. If the Town prefers, SLR can retain a landscape contractor to dig and restore test pits. A separate scope amendment can be prepared should this be needed.
Page 537
Section 6
Page 538
APPENDIX A Cost Proposal Name of Engineering Firm: ___________________________________________________ Services Needed On-Call Engineering and Related Services Please indicate your firm’s hourly fees over the five-year period of the contract Billing Category Hourly Billing Rate Project Manager ________________ Chief Engineer ________________ Engineer ________________ Technician Support ________________ Clerical/Researcher ________________ Other ________________ Other Expenses (if applicable): Identify any other categories and costs required to provide Engineering and On-Call services that are not included above: ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ Rate Adjustments: All hourly rates and fee schedules are valid through December 31 of the calendar year in which this Agreement is executed. Thereafter, rates shall increase by five percent (5%) annually. Work performed after a rate adjustment shall be billed at the Consultant's then-current average billing rates for similar personnel classifications and services. Page 7 of 7
Page 539
1 2026 US Discounted Rate Schedule SLR PROFESSIONAL SERVICES HOURLY RATE Senior Advisor $350 Senior Principal $295 Principal 2 Principal 1 $275 $260 Senior 2 Senior 1 $245 $235 Associate 2 Associate 1 $215 $205 Project 2 Project 1 $185 $175 Staff 2 Staff 1 $165 $155 Chief Inspector Senior Inspector Inspector $225 $200 $185 Land Surveyor Party Chief Crew Member $180 $160 $140 Senior Draftsperson/Technician Draftsperson/Technician $155 $150 Administrative $115 Note: Time will be billed to the nearest ¼ hour
Page 540
2 REIMBURSABLE EXPENSES RATE Bond Prints $ 2.00 Each Large Bond Prints $ 3.00 Each Fixed Line Mylars $75.00 Each Color Plots/Mylars $30.00 Each Large Color Plots/Mylars $45.00 Each Photocopies –8½ x 11 $ 0.12 Per Copy Photocopies – 11 x 17 $ 0.24 Per Copy Color Copies – 8½ x 11 $ 1.25 Per Copy Color Copies – 11 x 17 $ 2.25 Per Copy Binding 0-200 pages $ 6.00 Per Bound Copy 201 or more pages $ 7.50 Per Bound Copy Board Mounting $25.00 Each Each FedEx – $0 to $25 $25.00 Per FedEx FedEx – Over $25 Cost Per FedEx Mileage IRS Rate Per Mile OTHER DIRECT CHARGES RATE Subcontractors, vendors, and other expenses Actual cost +15% Administrative charge 3% of Labor Charges Expert witness testimony services (court and mediation) 50% Labor Surcharge
Page 541
Making Sustainability Happen SLRCONSULTING.COM
Page 542
westonandsampson.com PROPOSAL | July 2026 Professional Engineering Services 712 Brook Street | Rocky Hill, CT 06067
Page 543
– Contents 0 Cover Letter 1 Firm Qualifications 2 Key Personnel 3 Relevant Experience 4 References 5 Project Understanding 6 Services Expected by the Town 7 Proposed Fee Schedule 8 Response to Evaluation Criteria
Page 544
westonandsampson.com 712 Brook Street, Suite 103, Rocky Hill, CT 06067 Tel: 860.513.1473 July 24, 2026 Mike Walsh, Town Manager Town Manager’s Office 15 North Granby Road Granby CT 06035 Re: Professional Engineering Services Dear Mike Walsh: Weston & Sampson is pleased to submit this proposal to the Town of Granby for professional on-call engineering services that will provide planning, design, engineering, and construction of a replacement running track and adjacent baseball and softball fields at the high school and middle school complex, a bathroom facility at Salmon Brook Park, pickleball courts at Salmon Brook Park, the assessment and administration of a sewer pump maintenance project, and other future tasks. Weston and Sampson’s team will be led by myself and my team of sports facility specialists who will apply their extensive professional experience in running tracks, public recreational bathroom facilities, pickleball courts, and oversee your sewer pump maintenance project, and any other tasks you may have during the duration of this contract. We welcome the opportunity to build upon our longstanding relationship with the Town of Granby. Our past work includes master plan studies for Granby High School and Granby Memorial Middle School. Most recently, we supported Granby’s Board of Education with environmental exploration services at the high school, and we look forward to continuing this partnership by supporting the town’s broader municipal capital improvement needs. Our Specialized Team Our team brings extensive knowledge and industry leading expertise in sports field and athletic renovation and new construction projects just like your projects. Our team averages more than 25 years of experience in the planning and design of sports facilities and associated recreational amenities, specializing in high-performing, multi-generational spaces. As the team leader/project manager, Ryan Chmielewski, RLA, ASBA, has an extensive background in designing and constructing sports facilities across New England, Atlantic coast, and specifically Connecticut. His experience includes the planning and design of running tracks; natural and synthetic turf athletic fields for clients in Cheshire, North Haven, and East Hartford, Connecticut; and pickleball courts in Greenwich, Bristol, and Quinnipiac University, Connecticut, as well as Springfield International Charter School in Massachusetts, among others. Our Local Knowledge & Experience As you are aware Weston & Sampson has supported the Town of Granby and many municipalities just like yours, addressing challenges through planning, permitting, design, and construction. Our team is located just 33 minutes away in Rocky Hill, Connecticut, and are able ensure timely responsive, community‑focused services. Our office location gives us the advantage of proximity to you, and with 90+ talented designers and engineers positioned locally, we are ready immediately and have capacity to complete the services needed for your projects on time. Additionally, we are proud to have delivered sports field and recreational facilities consulting services to communities across Connecticut, including Bloomfield, Bristol, Cheshire, Columbia, Darien, Ellington, Greenwich, Killingworth, Middletown, North Haven, Portland, and Simsbury.
Page 545
Page 2 We have developed our approach to providing responsive and timely services for your assignments, and our project team consistently meet regulatory-driven deadlines. Because of these initiatives, Weston & Sampson is poised to provide high-quality services for any assignment. Commitment to Timely & Successful Project Completion To meet your scheduled milestones and possible budget constraints, our project management team will actively oversee progress, monitor performance and quality of work to support the needs of your projects. This includes managing subconsultants and ensuring all project components align with the planned schedule, quality of work, and budget. Additionally, we will: Conduct early and often project budget reviews to maximize design value without compromising programming. Maintain a transparent schedule with clear milestones for efficient project management. Work closely with the town and stakeholders to align the final design with current and future needs. Our extensive project experience and talented team of professionals make Weston & Sampson a valuable partner and advocate for you. We are well positioned to provide the services required for the requested professional services. Through strong cooperation and collaboration, we seek to achieve outstanding, enduring results and exceed your expectations. Please do not hesitate to contact either of the undersigned regarding our qualifications or our submittal. Sincerely, WESTON & SAMPSON ENGINEERS, INC. Raju Vasamsetti, PE Ryan Chmielewski, RLA, ASBA Regional Manager Team Leader | Landscape Architecture 860-986-7933 | VasamsettiR@wseinc.com 860-616-6497 | chmielewski.ryan@wseinc.com Notes: Weston & Sampson has carefully reviewed the Town of Granby’s RFP and would appreciate the opportunity to negotiate a mutually agreeable indemnification clause if we are successful in securing this contract. Our requested changes for the Defense, Hold Harmless and Indemnification section of the RFP are listed below. In Line 5, insert the word “reasonable” between “including” and “attorney” In Line 7, after the period, add the following sentence: “Notwithstanding the foregoing, the duty to defend shall not apply to professional liability claims; however, the successful proposer shall be responsible for reimbursing the indemnified party, at the time of judgment, award, or settlement, for reasonable defense costs incurred in a proportionate amount equal to the successful proposer’s percentage of fault. In Line 11, strike the word “sole”.
Page 546
Firm Qualifications Contact Information Team Leader/Project Manager Ryan Chmielewski, RLA, ASBA, will serve as our primary contact with the Town of Granby. Introduction to Weston & Sampson For more than 125 years, Weston & Sampson has provided cost-effective, innovative solutions to our client’s challenges. We have completed hundreds of successful athletic facility and recreation projects where athletes learn, play, and compete. Designing public sports and recreational facilities including natural and synthetic turf fields, restroom facilities, and supporting features is one of our specialties, with over $100 million in sports field/facility and recreation improvement projects successfully realized. Our firm is well positioned to provide the Town of Granby with on-call engineering services for design and engineering services supporting the planning, permitting, and construction of athletic facility improvements and for a variety of your other capital improvement projects. As a full-service, multi- disciplinary consulting firm with more than 1,000 professionals, we provide comprehensive capabilities that span project assessment and planning from concept development through permitting, design, construction, and long-term operation and maintenance. A top-ranked US design and environmental firm, according to Engineering News-Record, Weston & Sampson is proud of our steady record of growth and comprehensive engineering excellence. Our firm has also been widely recognized by the American Public Works Association (APWA) and the American Council of Engineering Companies (ACEC), in further testimony of our creativity and performance. Office Locations Headquartered in Reading, Massachusetts, Weston & Sampson maintains regional offices throughout the Northeast and along the East Coast. Established in 1998, our primary office Ryan Chmielewski, RLA, ASBA Team Leader/Project Manager 860-616-6497 chmielewski.ryan@wseinc.com 712 Brook Street, Suite 103, Rocky Hill, Connecticut 06067
Page 547
Granby, CT | Professional Engineering Services supporting this project is Rocky Hill, Connecticut, located at 712 Brook Street, Suite 103, Rocky Hill, Connecticut 06067. Discipline Capabilities Our design studio is dedicated to creating dynamic, high-quality sports venues. Sports and Recreation facilities are not only a core focus of our practice, but they also serve as vital spaces that strengthen connections within the communities they bring together. On-Call Services Our firm understands the technical complexities of working within an on-call environment. Assignments can come at any time, and the type of work can vary widely. It is critical that the on-call staff be 1) experienced, 2) available, and 3) responsive. Our proposed team is accustomed to performing under these conditions, whether through formal on-call assignments or through long-term active relationships with existing clients. For many of our clients, our services have included support for long-term contracts and arrangements that have been in place for many years. Presently, our Connecticut office is engaged under on-call contracts with numerous public and private entities throughout Connecticut and western Massachusetts. Weston & Sampson understands the wide range of needs and sense of urgency that come with task-based assignments, having provided similar services to many Connecticut municipalities and agencies. As a result, this level of attentiveness is instilled in every member of our staff assigned to your projects, and we strive for total client satisfaction in terms of the depth of analysis, quality of presentations, accuracy of information, and professionalism of our staff. We consider the municipality to be an integral part of the project team, and, as such, we will maintain close coordination with administrative staff throughout the on-call contract to respond immediately to questions and concerns and ensure project success. Our extensive in-house capabilities include: • Sports Facility Assessment, Design, Bidding, & Construction Oversight • ADA-related Inventory, Analysis, & Accessible/Inclusive Design/Compliance • Public Facilities Planning & Design • Architecture & MEP • Structural Engineering • Site/Civil Development • Landscape Architecture, Planning & Restoration • Active & Passive Recreation Facilities Planning, Design, & Construction • Geotechnical Engineering • Aquatics Design & Engineering • GIS & Digital Mapping • Sustainable Design & Green Infrastructure • Regulatory & Enforcement Assistance • Transportation & Traffic Engineering • Construction Inspection, Oversight, & Management • Communitywide & Site-Specific Master Planning • Peer Review & Developmental Review • Hydrology & Hydraulics • Wastewater Collection & Treatment • Watershed & Stormwater Management • Environmental Site Assessment/Demolition/Remediation • Environmental Compliance & Permitting • Wetlands Replication & Restoration • Climate Resilience • Renewable Energy • Water Supply Development / Treatment / Pumping / Distribution • Water / Wastewater System Operation/Maintenance/Repair • Solid Waste Planning, Design & Management
Page 548
Granby, CT | Professional Engineering Services Sports Facilities Our specific experience includes assessing and designing athletic/field amenities that provide critical outlets for athletic competition and enjoyment. Of significant importance to our approach is addressing the recreation needs for each community. Many communities’ fields serve permitted sports leagues as well as less formal recreational pursuits, like a pickup game of football or spontaneous footrace. Therefore, Weston & Sampson develops specific, targeted plans that identify strategies for improving recreational and athletic opportunities. From single-sport fields to multi-sport complexes, our experienced staff ensure that every project meets industry standards, specifications, and community expectations. Our comprehensive services include sports field/facility design, landscape architecture, architecture, civil, structural, MEP engineering, construction oversight, and more. In addition, all our designs achieve ADA compliance and eligibility for federal, state, and local matching grants. Our ability to design facilities in a pragmatic, feasible manner is demonstrated by the large number of projects we have successfully completed, and our propensity for continued service in nearly all the communities in which we work. To complement our athletic facility design capabilities, we prepare clear and accurate construction document packages to ensure that projects are not only constructed successfully but also have the capacity to be maintained with the resources available. Fields & Stadiums Weston & Sampson’s athletic and recreational fields experience and services include: • Design & construction of individual fields to multi-sport complexes, including soccer, football, LAX, field hockey, cricket, rugby, baseball, softball Current On-Call Contracts • Town of Avon, CT • Town of Bloomfield, CT • Bristol Water & Sewer Dept • Town of Burlington, WPCA, CT • City of Danbury, CT • City of Derby, CT • Town of East Hartford DPW, CT • East Lyme Sewer & Water • Town of Enfield, CT • Town of Greenwich, CT • Town of Hartford, CT • Town of Mansfield, CT • City of Meriden, CT • City of Milford, CT • Borough of Naugatuck, CT • City of New Britain, CT • Greater New Haven WPCA • Town of North Branford, CT • City of Norwalk, CT • City of Norwalk First Taxing District, CT • Norwalk Redevelopment Agency • City of Shelton, CT • Town of Southbury, CT • City of Springfield, MA • Town of Thomaston, CT • West Springfield DPW MA • City of Waterbury, CT • Town of Westbrook, CT • CTDAS • CTDOT • NVCOG • Eversource Energy • Aquarion Water Company • CT Water Company Our goal is to create accessible, resilient, and exciting spaces. Our clients are our partners; in our athletic facilities work, we remain sensitive to community concerns and understand the need to serve every student, staff member, parent/guardian, and visitor.
Page 549
Granby, CT | Professional Engineering Services • Stadium & grandstand/bleacher facility design • Restroom & storage facility design • Sports lighting systems • Field renovations • Irrigation design • High-performance natural grass • Infill synthetic turf • Field-type needs evaluation • Troubleshooting existing fields • Community-wide athletic field assessments Tracks & Trails Our track experience and services include: • Analysis of numerous track systems • Construction of multi-lane tracks • Surfacing/resurfacing of natural & synthetic tracks • Running, walking, fitness, & multi-use trails • Stabilization with geotextiles Courts Our court experience and services include: • Design & construction of single, multi-court & multi-use courts, including tennis, pickleball, basketball, handball, volleyball, futsal & roller/street hockey • Asphalt & post-tension concrete • Refurbishment & replacement of features • Players’ benches & canopies • Backboards & rims • Netting • Fencing • Electrical & lighting systems • Storm drainage systems • Retaining walls • Related site amenities & furnishings Americans with Disabilities Act (ADA) Weston & Sampson maintains a thorough, up- to-date knowledge base of the ADA. Our comprehensive designs/projects for various communities meet all applicable federal and state guidelines. These designs ensure ADA accessibility/compliance and programming for users of all ages. From single-sport courts and fields to comprehensive athletic stadium complexes, our experienced staff ensure every project meets the industry’s specifications, standards, and community expectations. Innovative Solutions/Approaches Weston & Sampson stays at the forefront of design and trends in athletic/recreational improvement and routinely provides innovative design plans and strategies to meet the individual needs of our clients. We draw from the multi-disciplinary experience, skills, and resources of our firm to address project- specific, location-specific challenges. Our designers work with our infrastructure resiliency Project Highlight: High School & Middle School Athletic Facilities, North Haven, CT North Haven, CT Cheshire, CT
Page 550
Granby, CT | Professional Engineering Services experts to address predicted sea level rise and storm surge in our designs and provide flood protection and climate mitigation. In addition, working with our stormwater engineers, we implement innovative low-impact development (LID) designs and stormwater collection / storage plans at sites across New England. Our innovative design solutions also include our recent advances in designing universally accessible parks and playgrounds to accommodate inclusive play and multi- generational use. Stormwater Weston & Sampson provides stormwater management & hydrogeology services that include drainage inventory and assessment, flood control, water resources planning, watershed modeling, and permitting. We are currently assisting many communities in the development and implementation of EPA- approved programs to comply with required minimum control measures. Our experience has provided us with first-hand knowledge of stormwater best management practices, which enables us to advise and assist our clients with challenging stormwater quality and quantity issues. Weston & Sampson has decades of experience assisting communities in meeting their stormwater needs on small- and large-scale projects. Within the past two decades alone, our stormwater and water quality professionals have provided stormwater engineering services for more than 80 cities and towns. This experience ranges from addressing individual residential needs to system-wide drainage planning and design, including designs for park and recreation properties. We provide traditional engineering services such as evaluation, design, and construction of drainage infrastructure, but we are also at the forefront of our industry in offering state-of-the- art services such as digital data collection / management and incorporating green practices/LID into our designs. Additionally, we have assisted many communities with MS4 compliance and have an in-depth knowledge of the MS4 permit. Site / Civil Engineering Weston & Sampson has provided site/civil engineering services for a multitude of projects of varying complexity for municipal clients throughout Connecticut and the Northeast. These services have included multi-use paths, roadway design, circulation improvements, preparation of contract bid documents, and construction support. Other improvements designed include roadways, bridges, parking lots, ornamental illumination, wayfinding signage, and associated site and utility relocation work. Weston & Sampson offers extensive drainage services and can assist with a multitude of diverse drainage-related issues. We have decades of experience assisting communities, agencies, and private entities in meeting their drainage needs on small- and large-scale projects. This experience ranges from addressing individual residential needs to system-wide drainage needs. We provide traditional engineering services such as evaluation, design, and construction of drainage infrastructure but are also at the forefront of our industry in offering state-of-the art services such as digital data collection/management and incorporating green practices/low impact development into our designs. Weston & Sampson brings extensive stormwater management experience with a multitude of diverse stormwater-related projects and backgrounds. We have decades of experience assisting communities, agencies, and private entities in meeting their stormwater needs.
Page 551
Granby, CT | Professional Engineering Services Bidding & Construction Administration Weston & Sampson routinely assists through the bidding phase, and the subsequent construction phase, utilizing the core staff members who were involved with the project’s development and documentation. Our extensive experience with municipal projects allows our team to complete these tasks in compliance with Connecticut regulations and best practices. In situations that bring a higher level of complexity to the process (e.g., bid protests), we have dedicated construction management staff members who help guide decision-making and complete the process in a cost-effective manner. Weston & Sampson typically assists in the bid process by preparing electronic versions of construction documents that can be posted to one of the local print house “bid-house” websites for access by the contractor community; attending pre-bid meetings with potential contractors; reviewing bids from filed- sub bidder(s) and making recommendations; reviewing bids from general contractors and providing recommendations regarding the successful, qualified low bidder; attending public information meetings; and providing any necessary follow-on construction services. Many projects are multi-faceted and require an interdisciplinary team to develop a strong design and limit change orders. During the construction phase, the Weston & Sampson team that prepares the construction documents provides the full range of standard A/E administration services (e.g., contractor submission review, responses to requests for information, responses to field conditions, responses to proposed modifications, review of requests for payment, periodic project meetings, and observation of the progress of the work). Weston & Sampson has been providing construction administration and resident inspection services for infrastructure construction throughout New England for more than a century. Our in-house Construction Services Department (CSD) offers superior services in construction management / administration and resident representation. Our CSD staff are experts in overseeing construction contractors, reviewing documents for constructability before bid, and negotiating Project Highlight: Springfield International Charter School Tennis & Pickleball Courts, Springfield, MA
Page 552
Granby, CT | Professional Engineering Services change orders. CSD staff are available to provide consultation to the project team, and/or other support as appropriate. Weston & Sampson has provided resident representation services for many of our infrastructure design and construction projects across Connecticut and throughout New England. Responsibilities typically include review of shop drawings, contractor oversight, creation of daily and weekly reports and records of daily quantities, attendance at biweekly progress meetings, review of monthly pay estimates, field verification of pipeline elevations, client and community relations, and preparation of as-built record drawings, among other project-specific and as-needed tasks. Our extensive experience includes providing resident representation services for large, complex stormwater projects in densely congested urban areas, small office buildings, and parks of at least 1-acre in size within the last 10 years. Community Engagement Weston & Sampson brings decades of experience in public sector-focused community engagement, working extensively with public groups to report findings, gauge opinion, and build consensus. Our approach is rooted in clear, accessible communication, supported by a dedicated team of communications and graphics professionals. We prepare and present legible plans, photorealistic renderings, 3D models, estimates, and other key materials to ensure complex technical and regulatory information is understandable for all audiences. Our commitment to meaningful engagement drives us to use a range of formats and tools designed to educate, engage, and entertain. We value public presentations that foster an affinity for both the presenters and the project, promoting collective buy-in and facilitating project progress. Additionally, we employ multi- pronged, multimedia strategies that incorporate various platforms to reach diverse community members. To strengthen community ties and support long-term resilience, we prioritize empowering stakeholders, residents, and community organizations early in the process with the following methods. Intentional Event Composition • Ensuring representation reflects community demographics, neighborhoods, and knowledge Overcoming Barriers to Participation • Working respectfully with city/town representatives to address resource limitations and other constraints Community-Context Understanding • Using interactive techniques to gather stories, ideas, and feedback from a wide range of stakeholders Building on Local Knowledge • Avoiding “planning fatigue” by leveraging existing efforts and local expertise and encouraging ongoing community involvement. We strive to keep communities at the center of project planning, establishing an ongoing public dialogue to understand their needs and preferences. Our team develops concept plans tailored to community priorities, typically accompanied by budgets, phasing, funding, and implementation strategies. This comprehensive approach integrates social equity, climate resilience, and LID principles, transforming these goals into actionable elements.
Page 553
Granby, CT | Professional Engineering Services Experience with State-Funded Projects & Federal Labor Standards/Davis Bacon Weston & Sampson has extensive experience with state and federally funded projects involving athletic fields in Connecticut. Additionally, as a public sector focused firm, we understand Section 106 Historic Preservation Act and BABA requirements and also have the experience to provide accurate cleanup costs, including Davis-Bacon wage rates Weston & Sampson has consistently remained at the forefront of obtaining available funding from federal, state, and local sources to expand the scope of projects for municipal clients. The firm assists with project funding and financing strategies, and grant/loan application preparation, including projects that involve a combination of funding sources. Our staff is accustomed to the specialized reporting requirements inherent with state and federally funded projects, as well as restrictions or limitations that may accompany specific funds. The firm maintains excellent working relationships with EPA, CT DEEP, FEMA, and other regulatory agencies. Project Highlight: LoPresti Park, Boston, MA
Page 554
Granby, CT | Professional Engineering Services Water Engineering Expertise Weston & Sampson is a leader in drinking water system planning and improvement projects. Weston & Sampson has provided expert water system master planning, hydraulic modeling, and water facilities evaluation and planning services for hundreds of communities. Our team of professional engineers and operations specialists are experienced at evaluating supply, storage tanks, treatment, distribution, pumping needs, and existing water system facilities, as well as developing phased improvement programs and detailed cost estimates to assist communities with master planning efforts. Our range of services also includes water service installation and private well abandonment, which have been completed through both traditional design-bid-build methods and using our in-house construction services and well and pump department under design-build methods. Wastewater Engineering & Pump Stations Our experience in advanced wastewater treatment facility (WWTF) technologies for improved treatment includes secondary and tertiary treatment upgrades, nutrient removal, preliminary treatment, solids dewatering, disinfection, instrumentation and building support systems, and other aspects of facility modernization. Most importantly, we have the knowledge and experience necessary to evaluate facilities and advise clients on the adequacy of facility design, process, and technology. Our engineers have been providing evaluation, planning, design, construction administration, start-up, operation, maintenance, repair, and troubleshooting services for most of our 126- year history. We have experience with wastewater treatment plants ranging in size from small (<10,000 gpd) commercial systems to larger 10 MGD+ municipal facilities. Our work on wastewater treatment facilities has included process alternative evaluations, BioWin treatment simulation development, changes and upgrades, modernization, efficiency improvements, and new processes, as well as building system renovations and
Page 555
Granby, CT | Professional Engineering Services improvements, including septage receiving and solids handling facilities. Our experience in advanced WWTF technologies for improved treatment includes secondary and tertiary treatment upgrades, nutrient removal, preliminary treatment, solids dewatering, disinfection, instrumentation and building support systems, and other aspects of facility modernization. Most importantly, we have the knowledge and experience to evaluate facilities and advise clients on the adequacy of facility design, process, and technology. Additionally, our wastewater pumping experience includes a broad range of transmission and treatment-related wastewater pumping, including many applications with low- head, high-head, flow-splitting, long force mains, dual force mains, and other unusual hydraulic conditions. Most of our pumping system projects include variable speed pumping schemes utilizing variable frequency drives (VFDs) and flow pacing control systems. Wastewater Collection System Weston & Sampson has assisted hundreds of municipal clients with the planning, design, and construction of their wastewater systems, including wastewater treatment facilities and collection/conveyance systems and pumping stations. We have provided evaluation, planning, design, construction administration, start-up, operation, maintenance, repair, and troubleshooting services all aspects of sewer engineering projects. The firm has a long history of providing engineering design and construction administration services for new, replacement and rehabilitated sewer pipelines. Weston & Sampson has designed approximately 300,000 feet of force main sewer replacement piping for communities in Connecticut and Massachusetts within the past five years. Our recent contracts are diverse, including installations of 72-inch pre-stressed concrete cylinder pipe and rehabilitation of large diameter sewers and storm drains. Our urban community designs have included planning, design, bid assistance, and construction administration for bridge crossings over streams and interstate highways, directional drilling beneath lakes, rivers and wetlands, and pipe-jacking below active railroads. Additionally, our work has included process changes and upgrades, modernization and efficiency improvements, and new processes, as well as many building and associated system renovations and improvements. Our services related to wastewater collection systems include: • I/I & SSES programs • Innovative and alternative systems • Needs assessments and decentralized planning • Septage management • New sewer and septic systems Highlights of our relevant experience over the last 15 years include: • Wastewater pumping projects at more than 200 sewage pump stations, including approximately 70 pump stations in the past five years • Wastewater treatment facility engineering projects, including evaluation and design, at more than 45 facilities in the New England region • Design and construction administration for approximately three million feet of new and reconstructed sewer pipelines and force mains • More than 170 construction contracts • Evaluation, planning, and conceptual design services on many other wastewater treatment process and pumping related projects
Page 556
Granby, CT | Professional Engineering Services Affiliated Service Offerings Weston & Sampson’s affiliated companies include Connecticut-based specialists that offer the Town of Granby some very specialized and unique services under their assignments. These offerings include: • Weston & Sampson CMR, Inc. – providing construction, maintenance, and repair (“CMR”) of municipal infrastructure, specializing in mechanical, electrical, process, instrumentation, and equipment systems, such as pumping stations, water booster stations, and treatment facilities, our licensed construction and maintenance division offers our clients the unique ability to not only evaluate and design municipal infrastructure systems offered by our engineering division, but also the ability to construct, maintain, and repair the critical community systems that serve the utility interests of the municipality. o On-Call Repairs – CMR provides around the clock emergency repairs. We respond any time, including weekends or holidays. We diagnose, advise, and then perform the repair work on the spot. Our trucks are equipped with cranes, spare parts, and tools. CMR also provides testing, evaluation, and troubleshooting for numerous mechanical, electrical, hydraulic, and process problems. • Weston & Sampson Services, Inc. (WSS) – providing licensed water and wastewater operations services, our operations personnel support and supplement municipal staff in the day-to-day operation of critical water and wastewater systems. We offer certified and licensed staff that meet the CTDEEP requirements for Class 1 – Class 4 operations. WSS has operated multiple leachate collection and treatment systems at landfills throughout the Northeast and Pennsylvania and brings that knowledge base to this project. WSS offers many years of relevant experience, qualified personnel, expert management and support teams, and a wide variety of excellent services for different types of facilities including, but not limited to: o Landfill leachate treatment and pump stations o Wastewater treatment plants o Wastewater pump stations o Collection and distribution systems o Water treatment plants o Water pump stations and storage tanks o Remediation/recovery pump stations o Drainage pump stations • SB Church (a division of Weston & Sampson CMR) – for 130 years, SB Church has provided drinking water well construction and maintenance to the communities in and around Connecticut. Specializing in municipal scale drinking water well production, our team can provide highly specialized installation, maintenance, and repair of critical drinking water well and pumping systems.
Page 557
Key Personnel Working with a team that is collaborative, responsive, and experienced is key to the success of engineering projects and assignments. As such, we offer the Town of Granby our project team of skilled engineers who provide high-quality services, demonstrated over the course of numerous projects for municipal clients throughout our region. On the following page, we have included our organizational chart that outlines the roles and responsibilities of our team members for the requested services outlined in the RFP. We have also included detailed resumes for these individuals, as well as other personnel designated for this project, at the end of this section. Capacity to Complete Services in Required Timeframe Weston & Sampson’s team is structured with consideration to provide depth of technical competence and the capacity to successfully meet the proposed project schedules and budgets. With more than 90 full-time technical staff, including landscape architects, in our Rocky Hill, Connecticut, office, supported as necessary by more than 1,000 technical professionals in our other East Coast offices, Weston & Sampson has the staff capacity to successfully complete the scope of work on time and within budget. In organizing and scheduling our staff for projects, we consider their commitments for other projects to ensure their availability to meet the proposed project schedule. During critical points, these personnel will devote up to 100% of their time, as needed, to deliver the project products and requirements on time and on budget. We have a demonstrated record of committing the resources necessary to meet important deadlines. Our firm’s depth-of-staff and breadth of expertise ensures the availability of highly qualified personnel to meet your project needs. Project Highlight: Bartlem Park, Cheshire, CT
Page 558
Granby, CT | Professional Engineering Services
Page 559
Granby, CT | Professional Engineering Services Project Management Raju Vasamsetti, PE Raju, regional manager of Weston & Sampson’s Connecticut office, will serve the role of principal-in-charge. He is a Connecticut registered professional hydraulic engineer with over 20 years of experience. He possesses specific expertise in the field of hydrology and hydraulics involving hydrology/ hydraulic modeling, drainage systems, bridge replacement/ rehabilitation, flood control, and stream restoration projects. His design experience also includes preparation of state, local, and federal permits; cost estimating and specifications; plan reviews; and coordinating design to meet construction requirements. In addition, he has experience working with several projects funded through LOTCIP, Federal Local and State Local Bridge Programs. Ryan Chmielewski, RLA, ASBA Ryan has more than 25 years of experience and is a team leader responsible for managing and executing projects from initial conception through project closeout with construction values ranging from $10,000 to $80 million. He offers vast experience working with Connecticut municipalities, athletics programs, and school systems on various project types, including Greenwich, North Haven, Norwalk, Cheshire, Storrs, and Thomaston on their athletic facility improvement efforts, among others. Ryan has previously successfully delivered on athletic and recreational complexes, running tracks, synthetic turf and natural grass fields, sports field lighting, and athlete and spectator amenities. He is accomplished in coordinating small- and large-scale multidisciplinary projects, including Meriden Green, and offers expertise in ADA accessibility, sustainable design, and athletic/recreational facility safety. Ryan is an active member in American Sports Builders Association (ASBA), presenting Planning for and Mitigating Noise Issues in Racquet Sports study at the National ASBA Technical Trade show. Technical Review Brandon Kunkel, RLA Brandon will serve as a technical reviewer of your project, and he will ensure your project remains a priority of the firm. Brandon has more than 25 years of experience in innovative planning and design. His areas of expertise include sports/athletic field and court amenities, open space parks, trails, ADA and equitable design, renovation and rehabilitation, durable and extended lifecycle solutions, and academic campuses. Brandon’s relevant experience includes supporting multiple athletic and recreation field efforts as principal or project manager, including High School, Middle School, & Town Various Athletic Facility Improvements in North Haven as well as Athletic Field Improvements in Greenwich. He also served as project manager of the multi- award-winning Langone Park and Puopolo Playground in Boston, working with the Boston Parks and Recreation Department to develop the conceptual design through construction for the complete refurbishment of this signature waterfront park in the North End. Joseph Perugini, PE Joe is a development/peer review specialist with 20+ years of experience. He has provided peer review services to municipalities for site development, traffic improvement, and stormwater management projects, such as for the Avon Village Center and as project manager for multiple peer review projects for the Town of Mansfield. Joe has extensive experience
Page 560
Granby, CT | Professional Engineering Services dealing with local Inland Wetland and Planning and Zoning Commissions in obtaining various land use approvals, and he has also provided engineering services for site developments throughout the state. He has a robust background that has involved projects for storm sewer drainage and improvements, stormwater management systems, stormwater quality, erosion and sedimentation control measures, wetland impact mitigation, roadway design, and site engineering and design. Subconsultants In addition to the multi-disciplinary capabilities of Weston & Sampson, we are pleased to offer the as-needed subconsultant services of Denno Land Surveying and Davison Environmental, LLC, bringing discipline expertise and local knowledge to this project. Denno Land Surveying Organization Name: Denno Land Surveying 2 Tunxis Road, Suite 214 Tariffville, CT 06081 Project Role: Surveying Denno Land Surveying is a full-service land surveying and civil engineering company located in Simsbury, Connecticut. Owner Brian Denno, LS, is a licensed Land Surveyor with a degree in Civil Engineering and more than 35 years of experience in the industry. Denno’s experience includes multiple Farmland Preservation Surveys for the Connecticut Department of Agriculture, ELUR plans all over western Connecticut, and most recently construction layout for a multi-use development in Simsbury, Connecticut; as well as FEMA flood certificates in Farmington, Old Saybrook, and Suffield. Davison Environmental, LLC Organization Name: Davison Environmental, LLC 10 Maple Street Chester, CT 06412 Project Role: Soil Scientist Davison Environmental, LLC provides consulting services for biological, wetland, and soil sciences, environmental impact assessment and mitigation planning to public agencies and private clients, including utilities, attorneys, site developers, municipalities, and public interest groups. In addition to identification, description, and classification of natural resources, the firm also provides functional evaluation of wetlands and other biological systems, guidelines for mitigation of potential adverse impacts, and permit support through expert testimony and public representation. Services provided revolve around the impact of human activities on terrestrial, wetland, aquatic, and marine resources. The firm specializes in biological and wetland surveys, impact assessment, and mitigation planning. Project Highlight: Route 1A Athletic Fields Recreation Complex, Walpole, MA
Page 561
westonandsampson.com
Master Flood, Climate Resilience Plan, Fairfield,
Connecticut. Principal-in-charge for the development of a
Master Flood and Erosion Resiliency Plan in conjunction with
RACE Coastal Engineering that included assessing coastal,
riverine, and pluvial flood risks, assessing alternatives,
prioritizing resilience mitigation strategies for conceptual
design and benefit-cost analysis for coastal flood risk,
developing a toolbox of green infrastructure strategies for
inland flooding, and building a storymap and data viewer
to support future decision-making. A Master Flood and
Resilience Plan will provide the town with a roadmap for
mitigating inland and coastal flood and erosion impacts
while maintaining the community’s natural coastal character.
Clough Brook Watershed Drainage Study, Waterbury,
Connecticut. Principal-in-charge for the evaluation of
riverine flooding, storm drainage systems and neighborhood
flooding issues for Clough Brook, which experiences
recurring flooding issues. The project included hydrologic
and hydraulic modeling, evaluation of the conveyance
systems, public engagement, and development and
prioritization of practical site-specific engineering solutions
for conceptual design and cost estimates.
Reconstruction of Guernseytown Road, Watertown,
Connecticut. Project manager involved with drainage
design and hydraulic analysis for the design, modeling,
and permitting for major drainage improvements, erosion
control, and water quality measures on Guernseytown Road
in Watertown. Used Hydraflow Storm Sewers to perform
drainage analysis, which included providing new storm
drainage systems and improving the existing infrastructure.
Key Project Experience
Raju Vasamsetti
PE
Regional Manager
26 Years of Experience | 11 Years with the Firm
Raju specializes in hydrologic/hydraulic analysis, design,
and permitting for stormwater management, highway, bridge
/ culvert replacement, flood control, and stream restoration
projects. His experience ranges from preliminary project
planning through final design to permitting and construction
contract administration. An expert in helping clients achieve
resiliency from inland/coastal flooding and shoreline
destruction, Raju focuses his efforts on understanding and
improving inland/coastal drainage and infrastructure for
municipalities.
Title
Regional Manager
Office Location
Rocky Hill, CT
Education
2003, Master of Science
Civil & Environmental Engineering
South Dakota School of Mines
& Technology
1999, Bachelor of Engineering
Civil Engineering
Osmania University
Registrations/Certifications
Professional Engineer:
CT No. PEN.0025720
NC No. 050292
OSHA 10-Hour Construction
Training
CTDOT-Approved Hydraulic
EngineerPage 562
westonandsampson.com Harbor Brook Flood Control, Meriden, Connecticut. Water resources engineer for hydrologic and hydraulic analysis of Harbor Brook and its watershed. Performed hydrologic/hydraulic modeling and design for upstream storage improvements, channel improvements and bridge replacement design using HEC-RAS and HEC-HMS. Pequabuck River Culvert Inspection and Hydraulic Analysis, Bristol, Connecticut. Performed a hydraulic analysis to assess the effects of sediment deposits in twin culverts through downtown Bristol during Hurricane Irene flood conditions. Completed a hydraulic analysis to propose the cleanout of sediment deposits through the culverts and raise the headwall/floodwall to alleviate flooding during hurricanes like Irene. Conducted scour analysis to evaluate the extent of scour hole on a severely damaged channel bank wall and proposed scour resistant design to repair the headwall. Recommended potential permits required by local, state and federal agencies for the proposed design. Bradley, Coe and Center Street Bridge Replacements Design, Meriden, Connecticut. Senior hydraulic engineer for the hydraulics, scour, drainage and permitting for the replacement of Bradley, Coe and Center Street bridges designed in compliance with CTDOT Local Bridge Program. Chatham Drive and Cossitt Road Storm Drainage Improvements, Norwalk, Connecticut. Team leader for the Development of design plans, cost estimate and specifications for storm sewer improvements to a neighborhood. Reviewed the storm sewer design, which was modeled in AutoCAD Hydraflow Storm Sewers. Also reviewed the outfall protection and water quality design, which were designed in accordance with CTDOT Drainage Manual. Assisted with construction admin services including responding to RFIs and developing change orders. Toilsome Brook Resilience Plan, Stamford, Connecticut. Principal-in-charge for the evaluation of riverine flooding and flood mitigation solutions through extensive community engagement, hydrologic and hydraulic modeling, development of evaluation criteria, evaluation of watershed to site specific scale mitigation strategies, benefit-cost analysis, and conceptual design and cost estimates for prioritized strategies. A final comprehensive plan provided conceptual designs and narratives in support of grant funding. South End Drainage Study, Stratford, Connecticut. Team leader for the Drainage Study for the South End neighborhood of Stratford, CT, which contains 1,022 acres. The study involved modeling the hydraulics of existing South End conditions and proposed improvements with the program PCSWMM. The study included preparing opinion of probable construction cost and potential permits for each improvement. Oronoque Village Drainage Study, Stratford, Connecticut. Project manager for the Drainage Study for the Oronoque Village, which contains a golf course and condominium community spanning 300 acres. Modeled existing drainage and proposed improvements with HydroCAD. The study included preparing opinion of probable construction cost and potential permits for each improvement. Crescent Lake Area Roadway and Drainage Improvements, Enfield, Connecticut. Project manager involved with drainage design for the design, modeling, and permitting for replacement of 11,000 feet of roadway including major drainage improvements, erosion control, and water quality measures around Crescent Lake area. Used Hydraflow Storm Sewers to perform drainage analysis, which included providing new storm drainage systems and improving the existing infrastructure. LOTCIP Program, Various Locations, Connecticut. Project manager involved with hydraulic modeling, bridge replacement, scour analysis, and drainage design for projects funded through LOTCIP program in the towns of Greenwich, New Milford, Thomaston and Watertown. Bruce Brook Hydraulic and Drainage Improvements, Barnum Avenue, Stratford, Connecticut. Project manager for field inspections, hydraulic analysis, design, permitting and construction inspection of 1,500 feet of Bruce Brook. Channel improvements include drainage widening/ relocating the channel and drainage outfall relocation on West Street. Submitted a FEMA CLOMR currently in review with FEMA. Freeman Brook Drainage Improvements, Oronoque Village, Stratford, Connecticut. Project manager for design revisions and construction administration of Freeman Brook Drainage Improvements in Stratford’s Oronoque Village. Raju Vasamsetti's Key Project Experience Cont.
Page 563
westonandsampson.com Various Athletic Facility Improvements, North Haven, Connecticut. Team Leader for the feasibility of and bid documents for athletic field improvements to DeMayo Baseball and Brozek Softball fields. Determined through an initial feasibility study, the fields committee desired to relocate the 90-foot baseball diamond to accommodate greater separation from neighboring property owners and to accommodate future grandstands for 350 spectators. The infield was experiencing a multitude of drainage problems that caused significant delays, cancellations, and postponement of games. Ryan led his team of sports field specialists in the evaluation of the existing rootzone, subsoils, and surface and subsurface drainage to determine an appropriate solution. Based on the findings of the rootzone being highly susceptible to compaction due to high levels of silt, fine sands, and very fine sands coupled with a very well drained subsurface, the rootzone was amended to reduce susceptibility to compaction. Due to the relocation of the infield by 60 feet and preliminary investigations, recommended field improvements included: strip, screen, stockpile and amend rootzone on site, establish subgrade, control compaction during construction, install new irrigation, install amended rootzone, and sod. Additional improvements included new LED sports lighting, new backstops, bullpens, perimeter fencing, and pre-cast concrete dugouts. Bids came in under budget at $2.391M that was established during the feasibility stage. Provided support to team during construction administration services through final completion of the project. Springfield International Charter School Tennis Courts Key Project Experience Ryan Chmielewski RLA, ASBA Landscape Architecture 26 Years of Experience | 7 Years with the Firm Ryan is responsible for managing and executing projects from initial conception through project closeout with construction values ranging from $10,000 to $20 million. He has vast experience with a variety of project types, including educational site development, civic/ institutional development, parks, athletic and recreational facilities, greenways/bikeways/multi-use trails, brownfields redevelopment, mixed-use development, retail, large-scale residential housing, and municipal streetscapes. He offers expertise in ADA accessibility, sustainable design, and playground safety. Title Team Leader Office Location Rocky Hill, CT Education 1999, Bachelor of Landscape Architecture University of Rhode Island Registrations/Certifications Registered Landscape Architect: CT No. LAR.0001048 Level 1 Slab-on-Ground Installation Post-Tensioning Institute Certification: ID No. 02207688
Page 564
westonandsampson.com Design Documents, Springfield Massachusetts. Team leader who led staff through feasibility studies, design, permitting, contract document preparation, and construction administration for five post-tension concrete tennis/pickleball courts. Responsibilities included client coordination, project management, and providing QA/QC throughout the process, along with collaborating with civil, geotechnical, structural, electrical, and mechanical engineers for associated work with the tennis courts to review constructability. Insured courts were designed according to the American Sports Builders Association (ASBA), United States Tennis Association (USTA), and USA Pickleball standards and recommendations. The fencing for the courts was designed to accommodate windscreens. Bids came in on budget at $3 million. Rockwell Park Master Plan, Bloomfield, Connecticut. Served as team leader for the park master planning process. Coordinated with the Director of Parks, Recreation, & Leisure Services to successfully plan and execute the various stages of the project. Guided our team of landscape architects, engineers, and sub consultants to bring the project within the budget and according to community expectations. Continued pro bono work to assist the town in the grant application process by providing updated construction costs, project description summary, and allocations of funds towards required grant categories. Athletic Fields Feasibility Study, Lexington, Massachusetts. Senior project manager for a town- wide master plan to evaluate the use and condition of 40 fields at 20 sites and make field improvement recommendations that meet town and field user expectations. Currently leading his team of sports field and recreation specialists through the study consisting of visual observations, data collection, stakeholder engagement, evaluation of almost 25,000 hours of use, and coordination between Recreation & Community Programs, Department of Public Works, Lexington Public Schools, and sports field stakeholder groups. Eastern Greenwich Civic Center Pickleball Courts, Greenwich, Connecticut. Team leader responsible for leading staff and sub-disciplines through a feasibility study, design, permitting, and contract documents for a post-tension concrete slab that accommodates four recreation-level pickleball courts. Provided design oversight throughout the process and worked with the design team to determine the appropriate cross-sections based on test pit results. Portland Recreational Complex, Portland, Connecticut. Senior project manager responsible for construction administration of a new park. The park includes two baseball and two soccer high performance sand based rootzone mix fields, splash pad with water repurpose system for irrigation, children’s playground, outdoor adult fitness area, bocce courts, future basketball courts, vehicular circulation and parking, roadway realignment intersecting a state road, pedestrian walking trails, and a restroom pavilion with a full kitchen. Chapman Park Feasibility Study, Cheshire, Connecticut. Senior project manager responsible for determining the appropriate use for a recently purchased 10-acre parcel of land adjacent to Bartlem Park. Led team of parks and recreation specialists through the master planning process including data collection, inventory and analysis, public engagement, stakeholder involvement, design charettes, survey monkey, athletic field use study, and the development of conceptual plans and associated costs for design, permitting, and construction. Athletic Field Improvements at the Springfield International Charter School (formerly SABIS), Springfield, Massachusetts. Senior project manager for the feasibility of and bid documents for athletic field improvements to a baseball and softball field with soccer field overlay and a dedicated grass soccer field. The school was experiencing poor drainage, compacted soils, and a multitude of drainage problems that caused significant delays, cancellations, and postponement of practices and games. During the feasibility study, led his team of sports field specialists in the evaluation of the existing rootzone, subsoils, and surface and subsurface drainage to determine an appropriate solution based on client expectations. Several options were presented to the school, ranging from renovation to complete field reconstruction, as well as the installation of synthetic turf, with costs ranging from $400K to $5M. With his project team, coordinated permitting and prepared bid documents for bidding for replacement of the existing fields with a high performing sand based rootzone mix. Bids came in under the $2.2M budget that was established during the feasibility stage. Ryan Chmielewski's Key Project Experience Cont.
Page 565
westonandsampson.com Athletic Complex Renovations at Wayland High School, Wayland, Massachusetts. Project manager and team leader for the comprehensive design, engineering, and construction administration services as part of the renovation of the existing athletic complex at Wayland High School. Improvements included new courts, outdoor track and synthetic turf field; a new turf field; new restroom, concession, and ticket sales buildings; replacement of the bleachers and press box; a new softball field; updated sports field lighting; and associated parking improvements. Claxton Field Renovation, Needham, Massachusetts. Principal-in-charge for the renovation of two (2) existing softball fields as well as a parking lot, installation of new plantings, and incorporation of walking trails and stormwater drainage/management. Project also involved interim grading for future pickleball courts. Cricket Field Renovation, Needham, Massachusetts. Principal-in-charge for the evaluation of playing fields for school and community sports leagues. Developed plans, details, and specifications for improvements including stripping of the turf cover, slight regrading of the entire subsurface footprint to correct inconsistencies, amended soils, and a new irrigation system. Key Project Experience Brandon Kunkel RLA Landscape Architecture 24 Years of Experience | 11 Years with the Firm Brandon specializes in innovative design and master planning, with expertise in athletic field and court complexes, urban parks, academic and corporate campuses, and natural resource conservation and rehabilitation. He manages land use development projects, addressing complex environmental, sustainability, and historic preservation issues. Brandon regularly collaborates with public officials, state agencies, and external consultants. Title Discipline Leader Office Location Boston, MA Education 2001, Bachelor of Landscape Architecture University of Rhode Island Registrations/Certifications Registered Landscape Architect: CT No. LAR.0001609 ME No. LAR5342 MA No. 4040 RI No. LA.0000735
Page 566
westonandsampson.com Conway Park Redevelopment, Somerville, Massachusetts. Project manager responsible for leading this athletic field and playground/plaza improvements effort that involved converting this contaminated/brownfield site into a healthy public park, with a splash/spray pad, playground, plaza/gathering areas, and multiuse synthetic turf field that was incorporated into the soil cap design. Route 1A Athletic Field Complex, Walpole, Massachusetts. Project manager responsible for the planning, final design, and construction services for this 30-acre, multi-sport and recreation complex. The new facility includes two full-size multi-sport synthetic turf fields; two full-size natural turf soccer fields, overlayed with full-size baseball and softball fields; two basketball courts; a universally accessible playground; a support building; walking paths; parking; and supporting infrastructure. Community Field Complex, Portsmouth, New Hampshire. Provided landscape architecture and construction administration support for athletic fields master plan design and the first phase design and implementation under a multi-phased program. The associated site improvements of the first phase of the project included the design and construction of a new synthetic turf multiuse field, sports lighting, parking, pedestrian access, drainage, plantings, and other athletic field support amenities. Improvements to LoPresti Park, East Boston, Massachusetts. Provided design, permitting, and construction administration work for this Boston Parks and Recreation Department waterfront park project, which involved construction of a state-of-the-art synthetic turf field (funded in large part by the United States Soccer Association), realigning pedestrian connections, rotating fields for game play and practice to allow for a more efficient use of the site, positioning the most-used elements of play for improved park safety and access, and climate-resilient design considerations. The final design includes granite sea wall blocks installed in a staggered pattern to diffuse wave action during extreme high tide conditions. Open Space and Recreation Plan Update, Seekonk, Massachusetts. Responsible for the development of a town-wide open space and recreation plan aimed at delivering higher performing sports and recreation facilities to residents. Comprehensive Athletic Field & Court Utilization Study, Wellesley, Massachusetts. Responsible for the assessment and development of a town-wide feasibility study to examine existing field and court facilities; completion of a needs assessment of various user groups and the public; identification of the extent to which these needs are unmet/met; and design a strategy to close the gaps by adjusting the quantity, quality, or design of facilities that are charged with meeting those resident needs and expectations. This effort involved 42 fields and 36 courts at 16 sites. Redevelopment of Riverfront Park, Springfield, Massachusetts. Landscape architect for the development of renovation/restoration strategies as part of a master plan for this riverfront property, including park upgrades and infrastructure improvements. Park redevelopment included universal accessibility; site/pedestrian access and connectivity; horticultural and landscaping; an interactive water feature; and improvements to signage, performance spaces, lighting, and utility connections. Renovations to McConnell Park, Boston, Massachusetts. Landscape architect working on renovations to this Boston Parks & Recreation Department open space resource in the Savin Hill neighborhood of Dorchester. Park improvements include renovations to an existing ballpark including a synthetic turf Challenger Field and two natural grass ball fields. The site was within a 100-year flood plain and was being utilized for coastal resilience. The site entailed complex grading, drainage, and site layout to meet the goals of the city. Langone Park and Puopolo Playground, Boston Parks and Recreation (BPRD), Boston, Massachusetts. Project manager responsible for working with the BPRD to develop final designs, obtain permits, and provide construction administration for the complete refurbishment of this signature waterfront park in Boston’s historic North End. Design efforts included lighting, benches, interpretive signage conveying the unique historical and environmental heritage of this site, and climate/coastal resilient strategies. This multi-award-winning park/open space project is the first in the city designed with climate- resilient features embedded throughout to protect the park’s shoreline, the neighborhood, and other public assets from projected sea level rise and an increase in storm events. Brandon Kunkel's Key Project Experience Cont.
Page 567
westonandsampson.com On-Call Peer Review Services, Mansfield, Connecticut. Project manager responsible for the management of several multi-discipline (traffic, landscape, affordable housing, architecture) peer reviews for the Town of Mansfield Planning and Zoning Commission: • The Villas at Four Corners - Multi-Family Residential Housing • The Standard at Four Corners - Multi-Family Residential Housing • 106 Storrs Road Redevelopment - Mixed Use Development • 497 Middle Turnpike - Multi-Family Residential Housing • Villages at Four Corners - Multi-Family Residential Housing • HUB at Mansfield - Mixed Use Development Tasks include the review of Statement of Use document, site/landscape/architectural plans and details, traffic study, and affordable housing. Multiple rounds and Peer Review Reports were prepared, and representation was provided at local commission meetings. North Haven Various Athletic Track and Field, North Haven, Connecticut. Project manager responsible for the site/civil engineering, water service design, stormwater management and low-impact development (LID) design, local zoning/permitting, and construction administration services. Key Project Experience Joseph Perugini PE Wastewater 31 Years of Experience | 18 Years with the Firm Joe has expertise in a variety of civil engineering projects involving stormwater management, low-impact development (LID) design, erosion and sedimentation control measures, wetland impact mitigation, roadway design and realignments, site engineering and design, residential septic system design, preparation of construction plans and documents, and the development of detailed Opinion of Probable Construction Cost (OPCC) estimates. Joe is also experienced in coordinating with local commissions to obtain land use approvals and in performing engineering peer reviews. Title Technical Leader Office Location Rocky Hill, CT Education 1994, Bachelor of Science Civil Engineering University of Connecticut Registrations/Certifications Professional Engineer: CT No. PEN.0024027 MA No. 54381
Page 568
westonandsampson.com Page Park Phase 1, Bristol, Connecticut. Project manager responsible for the site/civil engineering, phased erosion control plans, water/sanitary system designs, local zoning/permitting, state permitting (OSTA), stormwater management and low-impact development (LID) design, and construction administration services. Bible Street Park & Havemeyer Field Improvements, Greenwich, Connecticut. Project manager responsible for the site/civil engineering, stormwater management and low-impact development (LID) design, local zoning/permitting, and construction administration services. Springfield International Charter School (SICS) Post-Tensioned Concrete Tennis and Pickleball Courts, Springfield, Massachusetts. Project manager responsible for the site/civil engineering, water service design, stormwater management and low-impact development (LID) design, local zoning/ permitting, and construction administration services. North Haven Vanacore Track & Field, North Haven, Connecticut. Project manager responsible for the site/civil engineering, water service design, stormwater management and low-impact development (LID) design, local zoning/permitting, and construction administration services. Bloomfield Rockwell Park Master Plan, Bloomfield, Connecticut. Project manager responsible for the site/civil engineering, utility coordination, stormwater management and low-impact development (LID) design considerations associated with the master planning process. Engineering Services for Pond Dredging at Buena Vista Pond, Beachland Park Pond and Wolcott Pond, West Hartford, Connecticut. Project manager responsible for the watershed analysis and determination of sediment load for three municipal ponds and evaluation of options and recommendations for sediment removal (structural and/ or forebays). Other responsibilities included preparation of a summary report to include sediment removal recommendations, permitting evaluation, conceptual design figures of project area, opinion of probable construction costs, and approximate schedule. The report will be utilized by the town to seek bids for the development of construction documents. McMackin Field Design, Revere, Massachusetts. Project manager responsible for the site/civil engineering, subsurface stormwater management and low-impact development (LID) design, erosion & sedimentation control measures, utility design, bid documents, and construction administration services. Byram Park Pool and Recreation Area, Greenwich, Connecticut. Project manager responsible for the site civil engineering, parking layout, building and landscape architecture, structural design, electrical design, pools/splash pad/pump and filter building design, low-pressure sanitary system design, local zoning/permitting, and stormwater management and low-impact development (LID) design. Cheshire Bartlem Park South – Phase 1, Cheshire, Connecticut. Project manager responsible for the site/ civil engineering, phased erosion control plans, water/ sanitary system designs, local zoning/permitting, state permitting (OSTA), stormwater management and low- impact development (LID) design, and construction administration services. Portland Recreational Complex, Portland, Connecticut. Project manager responsible for the design of multiple athletic fields, parking layout, building and landscape archi¬tecture, pools/splash pad/pump and filter building design, traffic design, subsurface sewage disposal system design, and local wetland permitting. Pear Tree Point Beach Park improvements, Darien, Connecticut. Project manager responsible for the site civil engineering, parking layout, landscape architecture, dewatering/dredging/erosion and sedimentation controls, hydrologic modeling, and stormwater quality design. Other responsibilities include local and state permitting support. Merwin Meadows Park Pond Dredging and Beach Restoration, Wilton, Connecticut. Project manager responsible for the design of the pond dredging and erosion and sedimentation control measures, and coordination of local, state, and federal permitting. Other responsibilities include development of construction documents, bidding support, and construction administration services. Joseph Perugini's Key Project Experience Cont.
Page 569
westonandsampson.com Vanacore Track Replacement at North Haven Middle School, North Haven, Connecticut. Assisted the team in preparing preliminary design through construction documentation and cost estimates at each project phase and provided construction oversight and administration services. With minor adjustments to the track layout, added 2 lanes to the straightaway for a total of 8 lanes. Improvements included a new track surface, long jump and triple jump lanes and pits, pole vault and high jump areas, fencing, sports field lighting, scoreboard, and concession and locker room access. The track was previously constructed with a 1.5-foot elevation change, which required significant grading and drainage to meet current standards. Various Athletic Field Improvements, North Haven, Connecticut. Landscape architect for the development of a $7M master plan for the North Haven Athletic Complex. Responsible for facilitating meetings with the town, developing master plan documents, and spearheading the development of bid documents and cost estimates. The master plan incorporates key elements requested by the town that will improve a variety of athletic fields. Improvements include locating future grandstands at both baseball and softball fields, baseball/softball field renovations, a new concessions building, a new 1,000 seat grandstand at the turf field, and tennis court renovations. With funding for Phase 1, Weston & Sampson prepared construction documents that addressed $3.5M in improvements. Key Project Experience Jonathan Tunsky RLA, CPSI Landscape Architecture 19 Years of Experience | 4 Years with the Firm Jon manages, designs, and details complex landscape architecture and site design projects. He brings extensive technical experience across diverse project types, including athletic fields, golf courses, parks, playgrounds, streetscapes, multiuse trails, educational campuses, housing developments, and peer reviews of landscape architecture and site development. Title Senior Project Manager Office Location Rocky Hill, CT Education 2006, Bachelor of Landscape Architecture SUNY College of Environmental Science and Forestry Registrations/Certifications Registered Landscape Architect: CT No. LAR.0001172 Certified Playground Safety Inspector: No. 45349-0522
Page 570
westonandsampson.com Athletic Fields Feasibility Study, Lexington, Massachusetts. Landscape architect for the completion of a town-wide athletic field feasibility study and development of an Action Plan that identifies prioritized improvements and summarizes all study findings. Efforts include an inventory and analysis of all existing fields, courts, and ancillary facilities and amenities; a needs assessment process to identify and prioritize community needs for fields, courts, and related recreational elements; capacity analysis based on existing and future demand for facilities; development of a plan for upgrading facilities and/or building new facilities as necessary; and outline of a potential implementation process including funding and phasing strategies for a 10-15 year period. Athletic Field Improvements, Greenwich, Connecticut. Landscape architect for a comprehensive inventory and analysis of the existing conditions of the community’s athletic fields and development of a series of recommendations for improvements to accommodate current and future demands that allows for the proper maintenance to achieve the maximum level of field playability and protection of any new investments. Project efforts include a Capital Improvement Plan for redevelopment of athletic facilities; plans, visuals, maps, analyses, spreadsheets, and forms; existing conditions analysis; materials and equipment storage/maintenance plan; demand analysis and phasing plan; public input; conceptual plan development and recommendations; and revenue generating potential. Bartlem Park Phase I Designs, Cheshire, Connecticut. Landscape architect responsible for providing technical support to complete Bid Documents for Phase 1 of this phased $14,870,000 master plan to renovate and enhance Bartlem Park. The master plan outlines a range of active and passive recreational improvements, including a Great Lawn, Town Green, paved walkways, nature trails, multi- purpose sports field, and parking. Phase 1 designs consist of the Great Lawn with a bandshell, paved walkways, multi-purpose sports field, and some additional parking. Rockwell Park Planning, Bloomfield, Connecticut. Landscape architect responsible for providing the necessary documents and graphics and attending all meetings and outreach events for this master plan to renovate and enhance Rockwell Park. The existing park was underutilized and did not meet the current recreation needs of the town. Project efforts included a needs assessment, focus group meetings, community outreach and public participation, three layout options for review, and a final master plan. The master plan includes a large multi-use rectangular synthetic turf field with lighting (including a 90’ diamond baseball field and a 60’ diamond little league field), pickleball and basketball courts, a restroom building, pavilions, picnic areas, a playground, community gardens, a multi-use path, exercise stations, lighting, and parking. Implementation of Page Park Improvements, Bristol, Connecticut. Working with the team to prepare graphics, renderings, grading plans, and cost estimates as part of the firm’s efforts to prepare permit and construction documents for the implementation of the Page Park Master Plan. Also responsible for attending all meetings with the client and the parks committee. Project efforts included assessing the master plan, providing recommendations for enhancing the area of the park around the pond, updating the master plan with additional city-requested programming/elements, and considering the city’s priorities and budget. Harbor Loop SoNo Wharf, Norwalk Redevelopment Authority. Provided landscape architecture support for the preparation of concepts, presentations and webinar surveys, preliminary documents, and cost estimates and attended all meetings with the client, stakeholders, and the public as part of the initial through preliminary design of three properties critical to the completion of the Norwalk River Valley Trail loop. Project efforts included analyzing the existing conditions; facilitating stakeholder interviews, focus group meetings, and two public meetings; and engaging CTDEEP at a preliminary application meeting to review concepts and determine permit requirements. The property called the Wharf was reimagined into a public space to serve the downtown, Maritime Aquarium, Sheffield Island Ferry, and visitors looking to explore the Norwalk River. Putnam to Thompson Air Line Trail Gap Connection Project, Putnam, Connecticut. Assisted with preparing options for possible routes to connect the 1.8-mile gap between the Town of Putnam’s River Trail and the State of Connecticut’s Air Line State Park Trail in Thompson. Prepared an option locating roundabouts at three intersections to allow for continuous traffic flow and reduced interruptions along the trail. Jonathan Tunsky's Key Project Experience Cont.
Page 571
westonandsampson.com Springfield International Charter School Tennis Courts Design Documents, Springfield, Massachusetts. Served as the landscape project architect for the development of five post-tension concrete tennis/pickleball courts, managing all phases from feasibility studies through design, permitting, contract document preparation, and construction administration. Responsibilities included direct client coordination, project management, and rigorous QA/QC oversight. Facilitated seamless collaboration with civil, geotechnical, structural, electrical, and mechanical engineers to ensure constructability and integration of all associated work. Ensured compliance with standards and recommendations set by the American Sports Builders Association (ASBA), United States Tennis Association (USTA), and USA Pickleball. Delivered the project on budget, with bids totaling $3 million. SICS Athletic Field Improvements, Springfield, Massachusetts. Landscape architect responsible for assisting with the preparation of construction documents and production efforts for athletic field improvements at Springfield International Charter School. The project included upgrades to a baseball and softball field with a soccer overlay, as well as the development of a dedicated grass soccer field. Various Athletic Field Improvements, North Haven, Connecticut. Served as project landscape architect for the $7,000,000 North Haven Athletic Complex master plan, contributing from project inception through the development of comprehensive master plan documents. Facilitated meetings with town officials and led the creation of detailed Key Project Experience Evan Andrikos RLA Landscape Architecture 15 Years of Experience | 12 Years with the Firm As part of the Sports & Recreation Group in the firm’s landscape design program, Evan is knowledgeable in landscape architecture design and construction, community / environmental planning, community design, and plant identification. He is proficient in AutoCAD, Civil 3D, GIS, Adobe Photoshop, Google SketchUp, and related design programs. Title Project Manager I Office Location Worcester, MA Education 2010, Bachelor of Architecture Landscape Architecture University of Rhode Island Registrations/Certifications Registered Landscape Architect: RI No. 780 Level 1 Slab-on-Ground Installation Post-Tensioning Institute, Certification ID No. 02207672
Page 572
westonandsampson.com bid documents and cost estimates. The master plan focused on strategic athletic field enhancements, including future grandstands at baseball and softball fields, renovations to existing baseball/softball fields, construction of a new concessions building, installation of a 1,000-seat grandstand at the turf field, and renovations to the tennis courts. With Phase 1 funding secured, led the preparation of construction documents addressing $3,500,000 in priority improvements outlined in the master plan. Bartlem Park Phase I Designs, Cheshire, Connecticut. Provided technical support for the completion of Bid Documents for Phase 1 of the $14,870,000 master plan, aimed at revitalizing and enhancing the park with diverse active and passive recreational elements. Contributed to the development of key components, including the Great Lawn, Town Green, paved walkways, nature trails, a multi-purpose sports field, and expanded parking. Ensured the accuracy and completeness of Bid Documents to support the successful implementation of the project. Implementation of Page Park Improvements, Bristol, Connecticut. Served as the project landscape architect, working closely with the team to develop key deliverables, including graphics, renderings, detailed grading plans, and comprehensive cost estimates essential for permit and construction document preparation. Conducted a thorough assessment of the existing master plan, providing strategic recommendations for enhancing the pond area and incorporating additional city-requested programming and elements into the updated plan. Ensured alignment with the city’s priorities and budgetary constraints, resulting in a feasible and impactful final design. Rockwell Park Planning, Bloomfield, Connecticut. Served as the project landscape architect for the Rockwell Park renovation master plan, leading the creation of essential documentation and visual materials to ensure seamless project communication. Actively participated in client meetings and public outreach events, facilitating productive dialogue and gathering crucial stakeholder feedback. Conducted a thorough needs assessment, organized targeted focus group meetings, and implemented comprehensive community outreach strategies to maximize public participation. This collaborative process resulted in three distinct layout options, each rigorously reviewed and refined. The final master plan included a large, illuminated multi-use synthetic turf field adaptable for both 90’ and 60’ diamond baseball, pickleball, and basketball courts, a new restroom facility, shaded pavilions and picnic areas, a modern playground, community garden plots, an accessible multi-use path with exercise stations, updated lighting, and expanded parking. Ensured the final master plan reflected the community’s vision and addressed the identified recreational deficiencies. Athletic Field Improvements, Greenwich, Connecticut. Landscape designer in support of a comprehensive inventory and analysis of the existing conditions of the community’s athletic fields and development of a series of recommendations for improvements to accommodate current and future demands that allows for the proper maintenance to achieve the maximum level of field playability and protection of any new investments. Project efforts include a Capital Improvement Plan for redevelopment of athletic facilities; plans, visuals, maps, analyses, spreadsheets, and forms; existing conditions analysis; materials and equipment storage/maintenance plan; demand analysis and phasing plan; public input; conceptual plan development and recommendations; and revenue generating potential. Courts Assessment and Capital Planning, Greenwich, Connecticut. Landscape designer for the evaluation of tennis courts and basketball courts at seven locations throughout the town. Efforts included documenting the current condition and conducting on-site investigations of the courts, including a visual assessment, applicable measurements, and relevant data collection. The project includes providing recommendations and preliminary costs for improvements to the courts, a cost benefit analysis between post-tension concrete courts and bituminous courts, and a replacement timeline. Athletic Fields & Courts Feasibility Study, Lexington, Massachusetts. Landscape designer for the completion of a town-wide athletic field feasibility study and development of an Action Plan that identifies prioritized improvements and summarizes all study findings. Efforts include an inventory and analysis of all existing fields, courts, and ancillary facilities and amenities; a needs assessment process to identify and prioritize community needs for fields, courts, and related recreational elements; capacity analysis based on existing and future demand for facilities; development of a plan for upgrading facilities and/or building new facilities as necessary; and outline of a potential implementation process. Evan Andrikos's Key Project Experience Cont.
Page 573
westonandsampson.com Recreation and Parks Master Plan, Avon, Connecticut. Lead project manager responsible for client coordination, public engagement, inventory and analysis and development of the written report. After inventorying 19 parks, evaluating received field use data and engaging with key stake holders, the developed community-led master plan identifies gaps in service, inequities among sports and future recreational needs based on trends. The master plan will serve as a roadmap for future park improvements and development, guiding decision-making and resource allocation to create a more equitable, inclusive, and vibrant park system for the entire community. Various Athletic Field Improvements, North Haven, Connecticut. Project manager for the development of a $7 million master plan for the North Haven Athletic Complex. Responsible for facilitating meetings with the town, developing master plan documents, and spearheading the development of bid documents and cost estimates. The master plan incorporates key elements requested by the town that will improve a variety of athletic fields. Improvements include locating future grandstands at both baseball and softball fields, baseball/softball field renovations, a new concessions building, a new 1,000 seat grandstand at the turf field, and tennis court renovations. With funding for Phase 1, Weston & Sampson prepared construction documents that addressed $3.5 million in improvements. Key Project Experience Emily Weckman RLA Landscape Architecture 19 Years of Experience | 3 Years with the Firm Emily has provided landscape architecture services for projects ranging from schools and municipal parks to residential design. She has substantial knowledge of management, construction document development, and planting and detailing. Title Project Manager I Office Location Rocky Hill, CT Education 2006, Bachelor of Science Landscape Architecture University of Connecticut Registrations/Certifications Registered Landscape Architect: CT No. LAR.0001344
Page 574
westonandsampson.com State Comprehensive Outdoor Recreation Plan, Rhode Island. Assisted in executing the community engagement strategy for the plan. This robust, multi- tiered approach ensured diverse and comprehensive feedback through a public opinion survey, targeted tabling events, interactive pop-ups, and focused group sessions with SCORP ambassador groups. The resulting data directly informed the development of targeted recommendations within the report. North Common Park Improvements, Lowell, Massachusetts. Assisted in finalizing the bid documents for a park that features a renovated 50- 70 baseball diamond field, player area, concession building, and terrace. Identified as one of the open space impact projects by the City of Lowell, the North Common project has received funding from the American Rescue Plan Act (ARPA). This funding will transform North Common and other beloved parks around Lowell into inclusive and better-equipped community spaces. This effort involves approximately $850,000 to $900,000 in improvements. Bartlem Park South Phase I Designs, Cheshire, Connecticut. Landscape architect responsible for supporting the completion of bid documents for Phase 1 of this phased $14,870,000 master plan to renovate and enhance Bartlem Park. The master plan outlines a range of active and passive recreational improvements, including a great lawn, town green, paved walkways, nature trails, multi-purpose sports field, and parking. Phase 1 designs consist of the great lawn with a bandshell, paved walkways, multi-purpose sports field, and some additional parking. Main Street Reconstruction, Branford, Connecticut. Contributed to the preparation and finalization of bid documents for the $11 million, 2,000-foot Main Street Reconstruction. This project encompassed a full spectrum of infrastructure improvements, including roadway resurfacing and realignment, modernized traffic signal systems, and upgraded underground utilities. Beyond the essential infrastructure, the project focused on enhancing the pedestrian realm with wider, ADA-compliant walkways, new street furniture, carefully selected and designed paving patterns, the incorporation of native plantings, and the implementation of a custom-designed roadside rain garden for improved stormwater management. 148 East Avenue Gap of the Harbor Loop Trail, Norwalk, Connecticut. Project manager responsible for the bid documents and associated permitting efforts for the 148 East Ave portion of the Harbor Loop Trail. The trail will feature close to 1,000 feet of new elevated boardwalk that will provide connectivity to existing trail sections along the NRVT trail system. This effort involves $3 million in improvements. Putnam to Thompson Air Line Trail Gap Connection Project, Putnam, Connecticut. Assisted in preparing the conceptual cost estimate and marketing brochure for the town for the highlighted preferred trail route that Weston & Sampson developed. The projected cost is in the range of $9-$12 million with the proposed site improvements ultimately closing the existing 1.8-mile trail gap between Putnam and Thompson. The multi-use trail design features trail improvements along the street, roadway improvements that include a rotary and a trail along the existing railroad. Bushnell Gardens, Hartford, Connecticut. Assisted in completing design development documents and a cost estimate through design development. The park is uniquely located at the intersection of Gold Street and Wells Street which naturally forms a triangular urban park that pulls pedestrians into it as they travel through the city. The proposed improvements feature a raised performance plaza, gardens, terraces lawns and a water feature. (with former employer) Stanley Quarter Park Site Improvements, New Britain, Connecticut. The redesign for the popular south side of Stanley Quarter Park addresses the many needs of the city and park users by providing a variety of passive and active recreation areas. Such improvements include lighted basketball courts, expanded playground, pavilion, sitting plaza, and picnicking areas. The park design also upgrades the parks circulation and connection by providing accessible ramps and stairs to the pond, an improved multi-use trail, and a designated parking lot. Responsible for design development, construction documents, and construction administration. (with former employer) Emily Weckman's Key Project Experience Cont.
Page 575
westonandsampson.com Various Athletic Field Improvements, North Haven, Connecticut. Landscape architect responsible for assisting with construction administration for the development of a $7-million master plan for the North Haven Athletic Complex. Improvements included locating future grandstands at both baseball and softball fields, baseball/softball field renovations, a new concessions building, a new 1,000 seat grandstand at the turf field, and tennis court renovations. Implementation of Page Park Improvements, Bristol, Connecticut. Working with the team to prepare details, plans, and cost estimates as part of the firm’s efforts to prepare permit and construction documents for the implementation of the Page Park Master Plan. Moakley Park Phase A, Boston Parks and Recreation Department (BPRD), Boston, Massachusetts. Landscape architect managing the landscape design of Phase A of Moakley Park. Project efforts include landscape architecture, climate resiliency, environmental, geotechnical, utility, and electrical engineering, as well as subconsultant collaboration, including work with Stoss on landscape design and schematic design verification and with Nitsch on stormwater engineering. Moakley Park Connectors, Boston Environment Department, Boston, Massachusetts. Co-deputy project manager and design task leader for this FEMA- funded project for the design and implementation of coastal flood protection strategies and tie-ins from Moakley Park to the surrounding neighborhoods. Responsibilities include analyzing existing utilities and conflicts; crafting technical Key Project Experience Emily Bousaada-Hampton PE, RLA, ENV SP Landscape Architecture 9 Years of Experience | 2 Years with the Firm Emily has diverse experience in landscape architecture and civil engineering, including grading and drainage design, hydrological / hydraulic analysis, environmental permitting, environmentally conscious planting planning, and public space design. Title Senior Landscape Architect and Civil Engineer Office Location Rocky Hill, CT Education 2016, Bachelor of Science in Engineering Civil Engineering University of Connecticut Registrations/Certifications Registered Landscape Architect: CT No. LAR.0001628 Professional Engineer: CT No. PEN.0034643 Envision Sustainability Professional: No. 24724
Page 576
westonandsampson.com report writeups; engaging the public for feedback on design options; generating alternate flood barrier connection options; and coordinating with technical experts, subconsultants, and a diverse stakeholder group to develop design consensus for continuing Moakley Park’s flood alignment across a technically challenging site. Harbor Loop SoNo Wharf, Norwalk Redevelopment Authority. Senior Landscape Architect and Civil Engineer for the preparation of concepts, presentations and webinar surveys, preliminary documents, and cost estimates and attended all meetings with the client, stakeholders, and the public as part of the initial through preliminary design of three properties critical to the completion of the Norwalk River Valley Trail loop. Project efforts included analyzing the existing conditions; facilitating stakeholder interviews, focus group meetings, and two public meetings; and engaging CTDEEP at a preliminary application meeting to review concepts and determine permit requirements. The property called the Wharf was reimagined into a public space to serve the downtown, Maritime Aquarium, Sheffield Island Ferry, and visitors looking to explore the Norwalk River. Saint Louis Sponge Park, Lowell, Massachusetts. Provided stormwater and utility design for the revitalization and redevelopment this critical open space in a community susceptible to environmental injustice into a high-performing, multi-functional, multi- generational climate-resilience community resource. Improvements for Phase 1 include a new 5-12 nature- themed play area, a splash pad, a picnic area, and resurfaced basketball courts. ARPA Open Space Capital Improvement Projects, Lowell, Massachusetts. Landscape architect/ engineer for the grant-funded redevelopment/redesign of four urban community parks in the City of Lowell, including O’Donnell Park, the North Common, Father Maguire Park, and Hadley Park. Responsible for providing stormwater and utility design services for all four parks. Tarrytown Riverwalk Extension Feasibility Study, Tarrytown, New York. The feasibility study for this project analyzes a missing, critical link between the existing RiverWalk under the Cuomo Bridge (former Tappan Zee Bridge) to Losee Park. The path promotes multi-modal transportation within the region and recreational opportunities for visitors and locals. As a Civil Engineer-In-Training, analyzed multiple route options that traversed steep topography, Metro-North Railroad, and highway rights-of-way while trying to preserve natural resources and historical and scenic value. While collaborating with a multidisciplinary team, assisted with 12+ feasible design options with unique site features. Work included grading analysis, gathering, and combining significant survey information, sections, on-site visits, coordination with federal and municipal institutions, and designing sculptural elements incorporated into site features, Photoshop / InDesign renderings, and construction documents. (with former employer) Norwalk River Valley Trail (NRVT) Phase II, Norwalk, Connecticut. Assisted with grading, attenuator implementation at a nearby bridge, trail cross-sections, and construction documents for a section that connects two discontinuous portions of the trail adjacent to the river. (with former employer) Boardwalk Design at ‘WALK’ Bridge, Norwalk, Connecticut. In conjunction with the Norwalk Redevelopment Agency, Stantec worked to design a new waterfront, shared-use path, and boardwalk which finishes Norwalk River Valley Trail’s Harbor Loop Trail. The connection traverses under the new WALK bridge and connects the mixed-use ‘Sono’ District to the existing trail. As a civil engineering designer, assisted with the preliminary design for the alignment, compiling survey information and a pre-application questionnaire for the Department of Energy and Environmental Protection (DEEP) report. (with former employer) Wil-Walk Feasibility Study, Norwalk River Valley Trail (NRVT), Danbury, Ridgefield, Redding, and Wilton, Connecticut. The section connects two discontinuous portions of the trail, starting in Norwalk and ending in Wilton. The route runs adjacent to the Rt. 7 & Rt. 15 interchange and will be integrated into the new interchange’s boulevard design. As a Civil Engineering Designer, she assisted with the logistics and proposed routes for the greenway trail encompassed by challenging terrain, woodlands, wetlands, highway right-of-way, private property, and railway corridor. She coordinated with municipal representatives to gather information about private property. She assisted with an over 6-million-dollar cost estimate for a feasibility study. Anticipated work includes pedestrian bridges, boardwalks, Conditional Letter of Map Revision (CLOMAR), drainage analysis, grading, and site analysis. (with former employer) Emily Bousaada-Hampton's Key Project Experience Cont.
Page 577
westonandsampson.com Renovations of Page Park, Bristol, Connecticut. Performed stormwater collection, detention and treatment design. Coordinated with utility companies for water, power, and sanitary sewer extensions into new park structures. Assisted landscape designers with grading and drainage challenges and created and refined details and specifications for construction of stormwater and public utility upgrades. Municipal Separate Storm Sewer Systems (MS4) Permit Registrations and Stormwater Management Plans (SWMP), Wethersfield, Connecticut. Engineer for this project involving the MS4 permit registration, SWMP, dry weather screening, wet weather sampling, and stormwater mapping, as required by the 2016 Connecticut General Permit for the Discharge of Stormwater from Small Municipal Separate Storm Sewer Systems (MS4) Reissuance with Modifications. Municipal Separate Storm Sewer Systems (MS4) Permit Registrations and Stormwater Management Plans (SWMP), Guilford, Connecticut. Engineer for this project involving the MS4 permit registration, SWMP, dry weather screening, wet weather sampling, and stormwater mapping as required by the 2016 Connecticut General Permit for the Discharge of Stormwater from Small Municipal Separate Storm Sewer Systems (MS4) Reissuance with Modifications. Key Project Experience Benjamin Hipsky PE Wastewater 6 Years of Experience | 7 Years with the Firm Ben provides services related to wastewater, stormwater, site/civil, water, and environmental projects. His experience includes CAD work, as well as cost estimates, water flow calculations, water and stormwater sampling, field survey work, smoke testing, manhole inspections, catch basin inspections, CCTV supervision, CIPP supervision, construction inspection, and the design of site improvements. Title Senior Project Engineer Office Location Rocky Hill, CT Education 2019, Bachelor of Science Civil Engineering University of Connecticut Registrations/Certifications Professional Engineer: CT No. PEN.0037198 NASSCO PACP | LACP | MACP: No. P0037072-042022 OSHA 10-Hour Construction Safety & Health
Page 578
westonandsampson.com Municipal Separate Storm Sewer Systems (MS4) Permit Registration, Orange, Connecticut. Engineer for this project that involves helping the town maintain compliance with the MS4 permit. Responsible for overseeing the dry weather outfall screening and testing; wet weather sampling; Illicit Discharge Detection & Elimination (IDDE) Investigations; source identification and removal; drainage mapping, inventory and evaluation; and report review. Waterbury Industrial Commons, Parking Expansion and Drainage Site Improvements, Waterbury, Connecticut. Assisted the engineer responsible for providing the design of the parking lot and associated site improvements, including a storm drainage system, site lighting, landscaping, erosion and sedimentation control, and sidewalks. Private Client, Industrial Wastewater Treatment Plant, Stratford, Connecticut. Assisted with site layout, parking, grading and stormwater management design, erosion and sedimentation control design, construction details, and preparation of bid documents. Avon Village Center, Avon, Connecticut. Assisted in the engineering peer review of project design documents, zoning compliance, stormwater management design and local permit applications associated with a large-scale downtown redevelopment project. Work includes preparation of technical report documents for presentation to the Town Planning and Engineering Departments. Efforts were repeated after a second submission to the town in the year following. Planning and Zoning Review, Greenwich, Connecticut. Assisted with the review of documents and plans submitted to the Town of Greenwich Planning and Zoning Department. Identified the sanitary sewer lines from proposed dwellings, as well as stormwater pipes, to help ensure codes and safety items were met. Department of Public Works Feasibility Study & Schematic Design, East Hartford, Connecticut. Performed building siting, area grading and stormwater design for the installation of a 20,000-square-foot fabric storage structure. Permitting assistance and utility coordination for fire suppression. Coordinated with the owner and architects for material preferences and sizing of structures. Performed turning movements to ensure accessibility to emergency and public works vehicles. Public Works Facility Improvements, Bloomfield, Connecticut. Assisted with water system design modifications and construction administration. Also assisted the lead surveyor in finding existing boundary markers and marking existing landmarks, as well as overhead wires. The survey was completed for the potential purchase of the parcel. Yarmouth DPW Facility, Yarmouth, Massachusetts. Assisted with the design and layout of the new DPW Facility. Compiled specifications regarding all site civil work including stormwater treatment and various utilities. Assisted with the yard grading and utility plans for the site including electrical, gas, water, septic, and drainage. Coordinated with the town regarding permitting and required information. Performed a turning movement for the town’s largest fire apparatus to ensure passage through the site. Sanitary Sewer Evaluation Survey, Stafford, Connecticut. Prepared a work plan that involved home inspections in search of illicit connections, smoke testing roughly 100,000 linear feet of pipe determine sources of inflow, and manhole inspections to rate and make recommendations on fixes for the towns sanitary sewer collection system. Worked with the client to locate additional manholes previously unmapped, which were causing additional unnecessary flow in the collection system. Sanitary Sewer Evaluation Survey, Bethel, Connecticut. Inspected the CCTV video for roughly 40,000 linear feet of pipe and made recommendations on fixes rated on a need basis to reduce and ultimately eliminate sources of infiltration. Observed and inspected heavy cleaning of over 1,000 linear feet in a trouble area to ensure future cleaning and inspection is possible. Sanitary Sewer System Rehabilitation Design and Construction Administration Services, Phase 1 through Phase 4, Derby, Connecticut. Engineer II providing design and construction phase services implementing a multi-year collection system improvements project across the city, in accordance with the EPA approved Infiltration / Inflow Control Plan. Services included design, development of construction documents, and construction phase services related to the installation of several thousand feet of Cured In Place Pipe (CIPP) pipe, manhole lining, sewer lateral rehabilitation, and gravity sewer replacement. Duties included the review of pre and post CCTV inspection and development of as-built documents. Benjamin Hipsky's Key Project Experience Cont.
Page 579
westonandsampson.com Complete Streets Improvements for Maple Road, Mansfield, Connecticut. Senior team leader providing quality control reviews and supporting the project manager and design team. This LOTCIP project will reconstruct approximately 8,000 linear feet of Maple Road from the intersection of South Eagleville Road (Route 275) to Spring Hill Road as well as mill and overlay 2,000 linear feet of Spring Hill Road. An 8-foot-wide multi-use path will be constructed along the entire project corridor as well as a concrete sidewalk along Spring Hill Road. A rectangular rapid flashing beacon is proposed at a mid-block crossing, and an existing 42-inch CMP culvert will be replaced with a precast concrete box culvert. This project will create a continuous pedestrian connection between the Mansfield Middle School and Downtown Mansfield, as well as the UConn campus. Multi-Use Path Design for Steele Brook Greenway, CTDOT State Project No 153-125, Watertown, Connecticut. Senior team leader supporting the project manager and design team in the delivery of final design. The project is a multi-use path with design including of 3,800 linear feet of a multi-use trail with a parking lot and prefabricated pedestrian bridge over Steele Brook. Key Project Experience Erik Jarboe PE Transportation 20 Years of Experience | 1 Year with the Firm Erik’s experience includes design, project management, and construction support. He brings expertise in highway/ roadway design, complete streets design, ADA & PROWAG, drainage design, NEPA, public outreach, and CTDOT programs and procedures. Title Senior Team Leader Office Location Rocky Hill, CT Education 2005, Bachelor of Science Industrial Technology Tech Management Central Connecticut State University 2002, Associate of Science Technological Studies Tunxis Community College Registrations/Certifications Professional Engineer: CT No. PEN.0029498 Associate DBIA, Design Build Certification Board
Page 580
westonandsampson.com Trail Reconstruction & Accessibility Improvements on the Air Line Trail, Pomfret, Connecticut. Senior team leader providing quality control reviews and supporting the project manager and design team in the delivery of final design. This project will reconstruct approximately 4.3 miles of the existing Air Line Trail, with an unpaved, 12-foot-wide granular fill surface for pedestrians, bicycles, and equestrian riders from Route 44/169 in Pomfret, CT, to the Henry Breault Footbridge over the Quinebaug River in Putnam, CT. The proposed design includes trail surface reconstruction; drainage swale and pipe crossing improvements; embankment erosion repair; trailside safety measures; and structural walls, ramps, and stairs to allow users to descend 40 vertical feet, from the elevation of the former railbed embankment to the elevation at the southern end of the footbridge. This is a Transportation Alternatives Program project with funding for the design and construction provided by state and federal funding. Highway Design Consultant Liaison Services, CTDOT, Statewide, Connecticut. Project Manager for highway design consultant liaison services for the CTDOT. Responsible for the direct oversight and management of consultant engineering firms delivering a variety of highway design tasks to the Department, including complete design of transportation safety improvement projects. (with former employer) Modern Roundabout to Replace Pulaski Circle, CTDOT, Hartford, Connecticut. As consultant liaison engineer for CTDOT, coordinated the preliminary engineering phase of the project for the Department while managing and overseeing the Task Order firm performing the work. The project proposes replacing Pulaski Circle with a modern roundabout. This Preliminary Engineering Phase involved the collection of traffic data, forecasting (by CTDOT planning) that data into future volumes, developing multiple design alternatives along with redistributed volumes, and providing recommendations for preferred alternatives. (with former employer) Off-Ramp Removal for Exit 21 I-84 Eastbound, CTDOT, Waterbury, Connecticut. As consultant liaison engineer for CTDOT, coordinated and oversaw the Final Design phase of the project for the Department while managing and overseeing the Task Order firm performing the design. The project proposes to remove the existing Exit 21 off- ramp from I-84 Eastbound in the city. The project includes extensive improvements to surface streets and intersections to adequately accommodate the rerouted traffic as a result of the ramp closure. ROW acquisitions, utility relocations, and coordination with an overlapping city project were also involved. (with former employer) Pavement Rehabilitation & Safety Improvements for I-95, CTDOT, Westport, Connecticut. Project manager responsible for the re-evaluation of the project scope and development of the preliminary design. The project proposed to rehabilitate the pavement, upgrade the roadway drainage systems, widen existing outside shoulders, incorporate bridge upgrades, and provide roadside safety upgrades. (with former employer) Roadway Reconstruction of Wolcott Street, Bristol, Connecticut. Project manager coordinating all aspects of the project delivery. Directly responsible for supervising the design of the project including roadway design, drainage design, and concrete culvert repairs. The intent of the project was to reconstruct the current roadway, provide a sidewalk for pedestrians, widen shoulders for bicycles, improve roadway drainage, provide several roadway safety improvements along a reverse curve on a steep downhill grade, and improve intersection and stopping sight distances. Managed the LOTCIP process and coordinated with the city and the council of governments (COG). (with former employer) Roadway Safety Improvements for Route 73, CTDOT, Watertown, Connecticut. Project designer responsible for the delivery of the project and permit applications from preliminary design through final PS&E of this CTDOT project. The project involved the realignment of two reverse curves, removal of an abandoned railroad bridge abutment, large rock cut, intersection improvements, roadway drainage upgrades and modifications, utility relocations, property acquisitions including a total acquisition, environmental permits, and sidewalks. (with former employer) Erik Jarboe's Key Project Experience Cont.
Page 581
westonandsampson.com Air Line Trail Reconstruction (SPN 111-126), Pomfret & Putnam, Connecticut. Project technical lead responsible for coordinating review and stamping of plans and providing design guidance on the preparation of construction plans depicting the resurfacing of the multi-use trail and drainage improvements along approximately four miles of the Air Line Trail in Pomfret and Putnam. Work included coordinating with multiple stakeholders including the Consultant Liaison Engineer, CTDOT, the Towns of Pomfret and Putnam, as well as various regulatory agencies to comply with all state and federal requirements. Responsibilities also included the design of the trail switchback to descend approximately 40-ft, the creation of Right of Way maps for temporary construction access, and management of geotechnical and structural groups for the design of block retaining walls and slope stabilization efforts. Steele Brook Greenway, Watertown, Connecticut (CTDOT State Project No 153-125). Project technical lead responsible for coordinating review and stamping of plans and providing design guidance on the preparation of final design plans. Project includes design of a multi-use trail with a parking lot and prefabricated pedestrian bridge. Reviewed design submissions for compliance with CTDOT, AASHTO, and PROWAG standards. Key Project Experience Jeffrey Santacruce PE, PTOE Transportation 31 Years of Experience | 7 Years with the Firm Jeff delivers transportation and traffic engineering, design, management, and permitting services for diverse public and private projects. His experience includes rural, urban, and interstate roadway design; reconstruction; traffic calming; roundabouts; safety enhancements; and Complete Streets initiatives. He is also skilled in managing interdisciplinary projects, cost estimating, quality assurance and control, constructability reviews, construction administration, and stakeholder communication throughout public engagement. Title Practice Leader Office Location Manchester, NH Education 1994, Bachelor of Science, cum laude Civil Engineering University of New Hampshire Registrations/Certifications Professional Engineer: MA No. 50065 NH No. 10650 CT No. PEN.0030580 RI No. 15978 VT No. 91133 ME No. 13637 FL No. PE85994 SC No. 36732 NC No. 048917 TN No. 132263 GA No. PE053939 VA No. 0402070116 WV No. 027364 DE No. 24804 Professional Traffic Operations Engineer: DC No. 4394
Page 582
westonandsampson.com Green Line Extension, Somerville, Medford, and Cambridge, Massachusetts. Senior traffic manager responsible for the review of maintenance traffic plans and traffic engineering-related design plans and submissions for this $2.3 billion design/build project to construct 4.5 miles of new light rail system for the Massachusetts Bay Transportation Authority (MBTA). The project includes construction of seven new stations, replacement or reconstruction of six bridges, and construction of a vehicle maintenance facility. As owner’s representative team member, responsibilities included reviewing traffic-related work product submissions on behalf of the MBTA to determine if the design-build team met the contract conditions for completeness, technical soundness, conformance with state and national standards, and accuracy, and provided comments to the MBTA. Submissions include design plans, maintenance of traffic plans, RFIs, and construction work plans. Additional work includes attendance at project meetings, coordination/ maintenance of traffic issues with the design-build team, field reviews, coordination of project permitting with cities and MassDOT, and public presentations. On-Call Transportation Contract, Charleston County, South Carolina. Transportation engineer responsible for review of the several dirt road paving and drainage improvement projects. Lead transportation engineer involved in the review of the plans for the Azalea Fuel Facility construction. Roadway Reconstruction to I-84 Intersection/ Interchange Improvements, Southbury, Connecticut. Traffic engineer responsible for reviewing traffic signal design, analysis, and MPT on improvements to Exit 14 along I-84, including improvements for pedestrians and bicyclists, drainage, roadway alignment, and intersection operations. Incorporated accommodations for Westbound off-ramp relocation and expanded Park N’ Ride Lot. Community Comprehensive Plan and Zoning Update, North Providence, Rhode Island. Lead transportation engineer for update of the local plan of development. Revisions involve a full update of the town’s current plan, approval through the Rhode Island Division of Statewide Planning and significant public involvement. This project also includes a comprehensive update of the town’s Zoning Ordinance and Development Regulations. Comprehensive Master Plan Update, Westfield, Massachusetts. Lead transportation engineer for update of the local plan of development. The city had not updated their master plan in over 50 years. Revisions involve a full update of the city’s current plan. This project will add sections for energy, climate change, and water supply among others. It also includes a significant public engagement element. Route One Corridor Study, Westerly, Rhode Island. Lead transportation engineer for development of a strategic plan to revitalize this corridor. The overall goal of the study was to encourage the type of development that improves functionality and reflects Westerly’s character and charm. This major study of a five-mile commercial and residential corridor was completed on an expedited six-month schedule. It included several major public engagement events, a website, a public survey, stakeholder engagement and analysis of transportation, housing, economic development, aesthetics, and zoning. Consulting Services for the American Rescue Plan Act (ARPA) Local Fiscal Recovery, South Kingstown, Rhode Island. One of two lead transportation engineers responsible for development of a strategic plan to revitalize five areas of the town and develop ARPA programming. Slated to receive $8.95 million over two years under ARPA, South Kingstown hired Weston & Sampson to provide specialized project development, design (civil, engineering, architecture, landscaping, and traffic engineering), and grant management services to maximize the town’s use of the ARPA funds to support their COVID-19 disaster response to economic recovery. These services include supporting the town with project management oversight and ensuring accountability, transparency, and compliance with all federal requirements. Resilient Master Plan and Open Space and Recreation Plan, Westhampton, Massachusetts. Lead transportation engineer for preparation of a resilient local plan of development as well as an open space and recreation plan. This is the town’s first- ever master plan. Development of the plan includes sections on agriculture, forestry, mining, climate change, economic development, energy, facilities and services, historic and cultural resources, housing, natural resources, open space, recreation, and transportation. Jeffrey Santacruce's Key Project Experience Cont.
Page 583
westonandsampson.com State Project 111-124; Air Line North State Park Trail Pedestrian Trail Crossings, Pomfret, Connecticut. Chief inspector and resident engineer for the construction of two new pre-fabricated steel pedestrian bridges and three pre-cast concrete arch pedestrian tunnels at five separate sites between Pomfret and Putnam along the existing trail. The project was administered in cooperation with the towns, CTDEEP and CTDOT, as well as coordination with the utility companies Eversource and Frontier. The work inspected included ground reinforcement of the soil foundations, installation of GRS-IBS Abutments and Wingwalls, reinforced structural concrete, erection of the superstructures, assembly of the three concrete arches, pervious structural backfill installation, roadway reconstruction and safety improvements at each site. State Project 63-618; Traffic Control Signal & Intersection Improvements, Hartford, Connecticut. Senior chief inspector / construction coordinator for inspection of construction for improvements to nine intersections in various locations within the city. Responsible for daily inspections of construction activities, compliance with material testing, processing change orders and other administrative documents. Presided over monthly progress meetings and engaged the contractor in periodic negotiation meetings, while providing coordination with the city engineering department, construction coordinator and the CTDOT District office personnel. Also responsible for supervising project inspection staff and ensuring staff access to any required resources to perform their duties. Key Project Experience Kevin Fahey NICET IV Transportation 32 Years of Experience | 18 Years with the Firm Kevin’s resident representative experience includes reconstruction and safety improvements to highways and bridges, construction and supervision of a solar home, emergency and routine building renovations, and office building demolition. He holds NICET Level IV certification as an engineering technician in highway construction; NICET Level I certification as an engineering technician in bridge safety; NETCCP certification for hot mix asphalt, soils and aggregate, and concrete inspection; and is an American Traffic Safety Services Association certified Traffic Control Supervisor. Title Chief Certified Construction Inspector Office Location Rocky Hill, CT Education 1993, Bachelor of Arts English Franklin Pierce University Registrations/Certifications NICET Level IV: Certified Engineering Inspector, Highway Construction NICET Level I: Certified Inspector, Bridge Safety NETTCP: Certified Hot Mix Asphalt, Soils & Aggregate, & Concrete Inspector NETTCP: Certified Concrete Technician NETTCP: Certified Quality Assurance Technician ACI: Certified Concrete Field Testing Technician
Page 584
westonandsampson.com State Project 63-714; Weston Street, Jennings Road, and Boce Barlow Way Traffic Control Signals & Intersection Improvements, Hartford, Connecticut. Construction coordinator for inspection of construction for traffic signal and intersection improvements. Responsible for supervising the project chief inspector with daily inspections of construction activities, compliance with material testing, processing change orders and other administrative documents. Assisted the chief inspector with contract interpretations and resolution of RFIs and clarifications. Provided coordination with the city engineering department, project manager and the CTDOT District office personnel. Also responsible for ensuring staff access to any required resources to perform their duties. State Project 155-168; Park Road and State Route 501 Capacity, Safety & Operational Improvements; West Hartford, Connecticut. Chief inspector for this project involving the relocation of the I-84 Exit 43 off-ramp, so that it is adjacent to the existing on-ramp, and provided for safety, capacity and operational improvements. This project also includes three new traffic signals, intersection improvements, ADA accessible sidewalk ramps with pedestrian push buttons, highway illumination, the development of the new Town Gateway area and the reforestation of the old off ramp. In addition to thousands of feet of subsurface drainage, electrical and fiber-optic network cable, the entire site is being restored with over 1,000 plantings and acres of turf establishment. State Project 94-239; Montauk Avenue Roadway Reconstruction, New London, Connecticut. Chief inspector and office engineer for the reconstruction of Montauk Avenue, Phase I. Work involved the full- depth reconstruction of 1,800 feet of Montauk Avenue from Bank Street to Lawrence and Memorial Hospital, including intersection improvements at multiple cross streets. Additionally, the project included utility relocations, new ADA ramps, sidewalk, curbing, striping, signage, dedicated bike lane, and drainage modifications. State Project 82-296; Westlake Drive Bridge Improvements, Middletown, Connecticut. Chief inspector and office engineer on a bridge replacement for Westlake Drive over Miner Brook. Work included the removal of triple corrugated metal pipes, and replacement with twin pre-cast concrete box culverts. Additional work included relocation a 12-inch water main over the new structure, and new sidewalk, guiderail, fencing, curbing, signage, and striping. State Project 134-139; Replacement of the New City Road Bridge over New City Brook, Stafford, Connecticut. Chief inspector for the installation of a 110-foot section of 16.8-foot x 8.3- foot curved aluminum box culvert, including cast-in- place reinforced concrete inlet and outlet headwalls and 465 feet of road reconstruction. Provided daily inspection of all construction activities and maintained all construction records in accordance with the policies and procedures of the CTDOT Construction Manual. Kept records using the SiteManager Software system. Coordinated field activities with CTDOT staff from the District 2 office in Norwich. State Project 132-131; Reconstruction of Avery Street, South Windsor, Connecticut. Chief inspector and office engineer for the reconstruction of 2,300 feet of Avery Street, as well as the realignment of the Avery/Beelzebub/Woodland intersection, to improve vertical and geometric sightlines. Work also included the complete replacement of the twin corrugated metal pipe culvert for Avery Brook with 65-inch and 73-inch arch reinforced concrete pipe culverts and headwalls, as well as new ADA ramps, sidewalk, curbing, striping, signage, and drainage installation. State Project 132-127; Kelly Road Reconstruction, South Windsor, Connecticut. Chief inspector for the full-depth pavement reconstruction, drainage installations, sidewalk and driveway apron replacement and maintenance and protection of traffic tasks. Provided daily inspection of construction, prepared daily inspection reports and quantity calculations, prepared MAT100 material testing requests and construction orders, and maintained project records using the Manual 4 Book system. State Project 164-232; Rehabilitation of Day Hill Road, Windsor, Connecticut. Resident project inspector for 2,000 linear feet of full depth pavement reclamation with Superpave surface, involving Federal ARRA funding with Connecticut Department of Transportation oversight, and CTDOT Four Book Method of record keeping. Kevin Fahey's Key Project Experience Cont.
Page 585
westonandsampson.com Windham Pump Station Grinder Pump Replacement and Associated Electrical Work, Windham, Connecticut. Managed the removal of an existing grinder pump and installation of a new pump. It was discovered that the electrical system was not adequate for the new pump and needed to be upgraded. Project team installed a new panel and conduit to successfully get the system up and running. Norwalk First Taxing District New Canaan Water Treatment Plant Stop Log Replacement and Sluice gate Repair, New Canaan, Connecticut. Managed the removal of old stop logs in the mixing basin and repair leaking pipe penetrations. After new logs were replaced and the leaking was controlled, assisted in repairs to the sluice gate at the bottom of the mixing basin. Connecticut Water Hillside Pump Station Pressure Reducing Valve (PRV) Replacement, Naugatuck, Connecticut. Managed the removal and installation of a new PRV for Connecticut Water’s pump station located in Naugatuck, Connecticut. Coordinated with Connecticut Water’s personnel for the required shut down when the final connections were to be made. The shut down was successful and the system was up and running as scheduled. Key Project Experience Rodney Van Deusen, Jr. Construction, Maintenance, & Repair 43 Years of Experience | 5 Years with the Firm Rodney provides project management/structural engineering for buildings and waterfront structures including construction management, property assessments, and field observation during construction. He has been responsible for project management and engineering for water and wastewater facilities, low- to mid-rise buildings and renovations, curtainwall design and construction, ferry terminals, piers, docks, bulkheads, relieving platforms, revetments, retaining walls, marinas, and specialized structures for the entertainment industry. Title General Manager Office Location Rocky Hill, CT Education 1982, Bachelor of Science Architectural Engineering Wentworth Institute of Technology 1980, Associate Degree Architectural Engineering Technology Wentworth Institute of Technology 1979, Associate Degree Building Construction Technology Wentworth Institute of Technology Registrations/Certifications Certified USACOE Quality Control Systems Administrator / Quality Control Manager SAS Work Diving Safety & Supervision Course Certificate TWIC Card Certified Diver - SDI
Page 586
westonandsampson.com Connecticut Water Heritage Village Wet Well Wizard Installation, Southbury, Connecticut. Planned and managed the installation of a Wet Well Wizard for Connecticut Water’s Pump Station at Heritage Village. The project consisted of installation of a compressor on a new concrete slab underground piping, the “Wizard” ejector, and associated electrical work. Norwalk Well Field PFAS Treatment Facility (Bridging Documents Phase), Norwalk, Connecticut. Provided construction feasibility expertise to the engineers for the development of the Bridging Documents for the Kellogg-Deering Well Field owned and operated by the First Norwalk Taxing District in Norwalk. This included meetings with the engineering staff, meetings with the client, meetings with the Connecticut Department of Health, review of potential designs, and schematic cost analysis. Hill-In-Dale New Pump Station Design-Build, Jewett City Water Company, Connecticut. Provided support and cost estimating during preliminary design for the proposed new pump station for Jewett City Water Company located in Lisbon. The project is currently under review by the client and once funding is approved construction will begin. Hartford Landfill Design-Build, Hartford, Connecticut. Provided support to the engineering team on multiple projects for the Hartford Landfill. Worked with the engineering department to design and construct new piping for two wells that were non-functioning, provided new PH and low Water monitoring sensors and electrical upgrades. New Canaan Water Treatment Plant Settling Tank Upgrades, Norwalk, Connecticut. Managed construction for the tank upgrades of two settling tanks for the New Canaan Water Treatment Plant owned and operated by the Norwalk First Taxing District. Project included coordination with Norwalk’s vendor, demolition of the existing tank, installing new components and testing to ensure the system operated to the districts standards. West Springfield Pipe Lining Project, West Springfield, Massachusetts. Assisted the Town of West Springfield in providing a solution for a leaking pipe the runs under the Great Brook in Southwick, Massachusetts. The recommended solution was to line the 16-inch existing pipe with a synthetic liner. We managed the construction team, which included a local excavating company and a national piping lining company. The entire project took two weeks, and the pipe was back in service before the peak demand season. UCONN Competition Pool Grating and Bulkhead Grating Replacement, University of Connecticut, Storrs, Connecticut. Managed the replacement of approximately 400 feet of gutter grating and replacement of bulkhead panels for the competition pool at UNCONN. Coordinated closely with the University so as not to interrupt any scheduled competitions or programs. Pools Tiling Project, Deerfield Academy, Deerfield, Massachusetts. Project consisted of hydro-blasting and tiling two pools at the Deerfield Academy. The two pools, one an eight lane competition pools and one 18-foot-deep dive pool, were stripped of their existing plaster finish and new tiling installed with a deadline on 40 calendar days. We provided overall project management and self- performed some of the work. Tootell Dive Pool Replastering Project, University of Rhode Island. Provided project management for the replastering of the 16-foot-deep dive pool. Project included hydro-blasting the pool to remove the existing plaster, replaster the pool, fill and balance the pool water, and retile several deck areas. The project schedule mandated that the pool had to be in-service within 30 days from the start of construction. Project was completed within the 30 days and the university was able to reopen on time. Property Condition Assessments, Confidential Client. Conducted PCAs at properties valued over $120 million and greater than 30 years old to identify potential insurance liabilities. Conducted Level I PCAs with a particular focus on electrical, plumbing, and building envelope systems. (with former employer) Property Condition Assessments, 300 Stillwater Avenue, Stamford, Connecticut. Conducted PCAs at properties valued over $4 million and greater than 30 years old to identify potential insurance liabilities. Conducted Level I PCAs were with a particular focus on electrical, plumbing, grounds, and building envelope systems. Provided and initiated recommendations for Level II inspections including thermal imaging scans of electrical systems and plumbing systems inspections. (with former employer) Rodney Van Deusen, Jr.'s Key Project Experience Cont.
Page 587
westonandsampson.com Heritage Village Wastewater Treatment Plant, Southbury, Connecticut. As chief operator, trained the new chief operator and assisted several operators to increase their certification level. Developed and oversaw numerous operations projects and several collections systems projects/ improvements. Also prepared the NPDES permit renewal application for the plant. New London Wastewater Treatment Plant, New London, Connecticut. As chief operator, trained the new chief operator and assisted with his transition to project management with preparation to successfully pass his Class IV certification exam. Also assisted operators and worked with regulators with solving difficult operational and collections systems issues. New Hartford Wastewater Treatment Plant, New Harford, Connecticut. As chief operator, worked with the town on setting up treatment plant and collections systems projects. Regularly attended town WPCA meetings and provided status reports to WPCA membership. Also worked with selected engineer on design elements for their upcoming treatment plant upgrade. Key Project Experience William Idarola, III Operations & Maintenance 31 Years of Experience | 16 Years with the Firm Bill has extensive wastewater operations and management experience, including operations, maintenance, and management of wastewater treatment plants of up to 10 mgd. He has served as chief operator, operations supervisor, and project manager for numerous small advanced treatment systems and has directed daily activities of up to 10 operators. Bill’s background includes biological wastewater treatment of both large-scale and small package facilities. His experience includes system startups, troubleshooting projects, and resolving compliance issues. Title General Manager Office Location Rocky Hill, CT Education 1998, Associate's Degree Science Charter Oak State College Registrations/Certifications CT Class IV Wastewater Treatment Plant Operator CT Class II Water Treatment Plant Operator CT Class II Water Distributions Systems Operator CT Class IV NEWEA-Wastewater Collections Systems Operator
Page 588
westonandsampson.com Heritage Village and Gunnery School Wastewater Treatment Facilities, New Hartford and New London, Connecticut. Wastewater manager and chief operator for the New Hartford, New London, Heritage Village and Gunnery School WWTF’s. Responsible for management and operations of water and wastewater treatment systems through four regional offices in three states. He oversaw a team of more than ten operating several treatment systems. Wastewater Treatment Operation and Management, Connecticut Water. Wastewater manager responsible for the management and operation of water and wastewater treatment systems through four regional offices in three states. Oversaw 10 employees operating 10 plus treatment systems. He also assisted other operators in preparing for their certification exams. He prepared and reviewed documents necessary for submission to DEP and DPH and made recommendations for budgeting and process changes. At Connecticut Water as the Operations Supervisor he was the Chief Operator of the Heritage Village WPCF in Southbury and supervised operation of six other wastewater facilities. WPCA, New Haven, Connecticut. At the City of New Haven WPCA as a wastewater mechanic he operated and maintained wastewater lift stations. He was trained to troubleshoot operational and mechanical problems in the wastewater environment. Repaired and/replaced equipment in lift stations, pumps, seals, motors, grit channel and bar screen equipment. William Idarola, III's Key Project Experience Cont.
Page 589
westonandsampson.com Geotech and Hydrogeologic Assessment of Bedrock, Multiple Sites, Bridgeport, Hamden, Stratford, and Trumbull, Connecticut. Hydrogeologist responsible for overseeing overburden drilling to confirm the bedrock surface depth, followed by the advancement of core barrels into the bedrock. Collected and inspected bedrock cores for the presence of water-bearing fractures, competency, and potential sulfide-bearing minerals. Prepared geologic logs describing the overburden stratigraphy, depth to bedrock, bedrock mineralogy, and location and depth of water- bearing fractures. Designed and directed the installation of bedrock monitoring wells, developed the wells, and collected groundwater samples for laboratory analysis. Seismic Refraction Surveys, Multiple Sites, Simsbury, Connecticut; Oxford, Connecticut; and Red Hook, New York. Team leader responsible for siting the locations of gravel-packed production wells within glacial outwash sediments. The projects included coordinating with a geophysical contractor to conduct seismic refraction surveys to determine the depth to bedrock across the permittable drilling areas. Prepared site maps showing the geophysical transects, reviewed the seismic refraction results and bedrock surface, and selected the proposed drilling locations to correspond with areas of deeper bedrock and optimized saturated thickness. Key Project Experience Michael Kapareiko PG, LEP Water 24 Years of Experience | 5 Years with the Firm Michael provides hydrogeology expertise related to water- supply source development, testing and permitting, hydrogeologic assessment, and environmental site assessment projects. His experience covers a range of water-supply, hydrogeologic, and environmental site assessment services, implementing unique and efficient solutions using a multi-disciplined approach. Michael’s management approach focuses on developing strong relationships with project teams, regulators, and subcontractors to ensure successful completion of project objectives. Title Team Leader Office Location Rocky Hill, CT Education 2001, Bachelor of Science Geology University of Connecticut Registrations/Certifications Licensed Environmental Professional: CT No. 569 Certified Professional Geologist: NY No. 000482 HAZWOPER 40 hours HAZWOPER Supervisor Training 8 hours CTDEEP Safe Boating
Page 590
westonandsampson.com Hydrogeologic Assessment for Production Facility, Newtown, Connecticut. Project manager for hydrogeologic assessment of potential impacts associated with the construction of a mulch production facility within the aquifer protection area. Responsible for identifying potential sources of impacts to the stratified drift aquifer, evaluation of soil properties, calculation of travel time, design of containment structures and development of operational procedures and an incoming soil screening plan to mitigate potential impacts to the onsite watercourses and underlying aquifer. The findings and recommendations of the assessment resulted in the Town granting approval for construction and operation of the facility. (with former employer) Hydrogeologic Assessment for New Housing, Greenwich, Connecticut. Project manager for hydrogeologic assessment of potential impacts associated with construction of new housing adjacent to wetlands. The assessment included soil classification and geologic logging, calculation of the area of additional impervious surface and stormwater and groundwater discharge to the wetlands. The assessment culminated with the preparation of a report that was submitted to the Town Inland Wetland Commission and concluded that the construction would not significantly impact the adjacent wetlands. (with former employer) Hydrogeologic Assessment, Greenwich (2), Monroe, Oxford and Westport, Connecticut. Project manager for hydrogeologic assessment conducted to evaluate soil suitability for installation of large onsite wastewater renovation systems. Oversaw the drilling of soil borings and excavation of test pits and directed the installation of monitoring wells. Collected in- situ soil samples for falling head permeability testing, performed sieve analysis and conducted slug testing. Data evaluation included calculation of hydraulic conductivities, travel time to sensitive receptors, nitrogen dilution and phosphorous adsorption. (with former employer) Former Manufacturing Site, Bridgeport, Connecticut. Project manager for investigation and interim remediation of a 76.5-acre former manufacturing site that contained an inactive industrial landfill, 55 former underground storage tanks (USTs) and two former metal hydroxide sludge beds. Completed a comprehensive review of prior environmental files and assisted with preparation of the Phase I ESA report that identified over 200 areas of concern (AOCs). Assisted with developing the Phase II and III work scopes and sampling plans, was directly responsible for managing daily field investigations which included up to five drill rigs and 15 field staff per day and resulted in the drilling of approximately 1,500 soil borings and the installation of more than 240 monitoring wells. Phase II and III activities included direction and oversight of geophysical investigations to delineate the extent of industrial fill and solid waste and locate USTs and buried drums, support of ecological risk assessments (SLERA and BERA), and water characterization and profiling. Data compilation and evaluation included expedited review of field and laboratory data to direct the iterative delineation of release areas, preparation of groundwater elevation contour maps, geologic cross sections, Phase II and III ESA reports and Significant Environmental Hazard reports. Remediation activities included developing interim remedial action plans (RAP), securing the necessary Town and State permits, excavation of TSCA waste, significant environmental hazard areas, and hot spots, recovery of free-phase petroleum and development of the site-wide remedy. (with former employer) Remediation of Former Manufacturing Facility, Winsted, Connecticut. Project manager for Phase III ESA, soil and groundwater remediation, compliance monitoring and verification of a former manufacturing facility subject to the Connecticut Property Transfer Program. Coordinated and conducted Phase III investigations, directed and oversaw UST removal and soil excavation at four releases areas, and coordinated and conducted compliance and post-remediation groundwater monitoring. Subsequent to the completion of remediation, a verification report was prepared that documented that all AOCs that existed prior to the transfer of the property had been investigated in accordance with prevailing standards and that soil and groundwater were in compliance with the CTDEEP Remediation Standard Regulations (RSRs). (with former employer) Michael Kapareiko's Key Project Experience Cont.
Page 591
westonandsampson.com Pequabuck River Flood Study, Plymouth, Bristol, and Plainville, Connecticut. Project manager for the preparation of a flood study and flood mitigation plan for the 18-mile reach of the Pequabuck River, covering three communities in central Connecticut. Project included preparation of HEC-REC riverine model, development of flood mitigation measures, and conceptual design of channel improvements to alleviate flooding. Stream Channel Improvements to Entry Dingle Brook at Tiffany Street, Springfield, Massachusetts. Project manager for the hydraulic analysis of the Entry Dingle Brook culvert and channel to prevent slope failure of stream embankments and provide a stable stream channel. Utilized HEC-RAS for the hydraulic model and FHWA HEC- 11 computational methods for stream bank erosion and countermeasure design. Byram Park and Pool Redevelopment, Greenwich, Connecticut. Team leader responsible for conducting a technical review of the water and sewer utility design. Peer Review Services for the Village Center Development, Avon, Connecticut. Team leader overseeing a peer review of the designed plans for this mixed-use development, incorporating commercial and retail, residential, and arts space. Kingsley Hill Road Improvements, Monroe, Massachusetts. Project Manager overseeing the preparation of the Massworks grant application and design of proposed roadway safety improvements along Kingsley Hill Road. Key Project Experience Robert Tedeschi PE Wastewater 40 Years of Experience | 10 Years with the Firm Bob has extensive experience in civil and water/wastewater engineering. He has designed and rehabilitated sanitary sewers, force mains, and pumping stations, and conducted I&I and SSES studies. His water resources work includes supply planning and designing municipal water systems and booster stations. He has managed numerous site/ development projects and on-call task-order assignments for public and private-sector clients. Title Senior Team Leader Office Location Rocky Hill, CT Education 1995, Master of Science Civil Engineering University of Connecticut 1985, Bachelor of Science Environmental Engineering University of New Haven Registrations/Certifications Professional Engineer: CT No. PEN.0016756 MA No. 46598 NJ No. 24GE04307400 PA No. PE058739E RI No. PE.0007340 SC No. 22315 06-10031 Board Certified Environmental Engineer
Page 592
westonandsampson.com On-Call Assignment, Bristol Water Department, Bristol, Connecticut. Project manager for the City of Bristol Water Department. Supervised the design of various water distribution system improvements, including water main, well field, and booster station design and water distribution system modeling, GIS mapping, and water storage tank inspection. On-Call Services to the WPCA, Torrington, Connecticut. Provided QA/QC for the design of improvements to the wastewater collection system based upon the recommendations of the Phase II SSES findings. Improvements included cured-in-place- pipe (CIPP) and structural improvements to manholes. Wastewater Pumping Station Upgrades, Various Locations, Milford, Connecticut. Developed Basis of Design Report for the planned upgrades to five wastewater pumping stations. Pumping station improvements included: new Exterior Diesel Generator, ATS, and controls, new pump control systems, mini split unit heat pump for heating and cooling, abandon/ demo steel dry pit structure to avoid Confined Space Entry, and converting wet pit to a Submersible Pumping Stations. The design was completed in 2022 with construction to begin in spring of 2023, with an estimated construction budget of $4.4M. Sewer Extension, Pomfret Connecticut. Provided project management and oversight services related to the design of four sanitary sewer pumping stations and approximately seven miles of sanitary force main sewer in local roads, state roads, and cross country east to the Putnam treatment plant. Route 190 Wastewater Pumping Station, Stafford Springs, Connecticut. Project Manager for a multi- discipline design-build effort to design and construct improvements to the RT 190 Pumping Station. Improvements consist of the replacement 500 gpm pumps, valve chamber piping and fittings, electrical upgrades, and a new control building and generator. Overseeing the review and processing of shop drawings and RFIs. Burtville Avenue and South Division Street Wastewater Pumping Stations, Derby, Connecticut. Project manager responsible for overseeing construction phase services for the Burtville Avenue and the South Division Street wastewater pumping stations, which have a firm capacity of 250 gpm and 350 gpm respectively. Oversaw the review and processing of shop drawings, RFIs, change orders, and overall project schedule and budget. The project was completed in 2017, on time and $100,000 under budget. New Public Works Facility, Waterbury, Connecticut. Provided technical review for engineering services for a new 120,000-square-foot consolidated public works facility including a new vehicle maintenance facility for Fire Department apparatus. The design included a new aboveground fuel system, including a double-sided fuel island, a new fuel management system programmed to track fuel usage by employee and by vehicle, and two concrete encased double-walled steel aboveground fuel tanks. Route 6 Water Main Replacement for Connecticut Water (CT Water), Plymouth, Connecticut. Project manager for the design of a replacement water main adjacent to and spanning two bridge structures along Route 6. Work included coordination with CTDOT, Town of Plymouth, and adjacent utilities. North Eagleville Road Area Infrastructure Repair / Replacement and Update, University of Connecticut, Storrs, Connecticut. Principal and QA/ QC reviewer responsible for overseeing preparation of condition assessment, design and construction phase services for various utility replacement and upgrades in the North Eagleville Road area of the Storrs Campus. Roosevelt Drive Wastewater Pumping Station Improvements, Derby, Connecticut. Project manager for the design of a new 2,800- gpm wastewater pumping station to replace the pumping station on Route 34 in Derby. Work included coordination with multiple utility companies (Eversource, Regional Water, and Derby WPCA) and coordination and permitting with the CTDOT, CTDEEP, local Inland wetlands, and Planning & Zoning. Four Corners Collection System and Pumping Station Upgrades, Mansfield, Connecticut. Project manager for the design of two new wastewater pumping stations and approximately 18,000 linear feet of new gravity sewers along Routes 44 and 195 and adjacent areas. Work included coordination with utility companies (e.g., Eversource and CT Water) as well as coordination and permitting with the CTDOT, CTDEEP, and local Inland wetlands and planning/zoning boards. Robert Tedeschi's Key Project Experience Cont.
Page 593
westonandsampson.com Brownfields Environmental Site Assessments, Southeastern Connecticut Council of Governments (SECOG), Multiple Properties, Southeast Connecticut. Project manager for conducting environmental site assessments at four former industrial properties in Southeast Connecticut, including Phase I, II, and III environmental site assessments (ESAs) at three former mill building sites and one former fuel terminal site. These former industrial properties are currently vacant, but each are planned for significant redevelopment in their respective municipalities. The Phase I ESAs included a review of existing site conditions, a review of previous environmental reports and regulatory history. Phase II ESAs included the collection and analysis of soil and groundwater samples for various constituents of concern (COCs) at identified areas of concern (AOCs), including per- and polyfluoroalkyl substances (PFAS) due to former textile manufacturing and past structure fires. South Meadows Redevelopment Considerations Study, MIRA Dissolution Authority – Hartford, Connecticut. Project manager for the environmental multidisciplinary study of the 80-acre former waste-to-energy South Meadows facility on the banks of the CT River. Study included a hazardous building material survey of former power block and waste processing buildings, review of soil and groundwater remediation and regulatory status, assessment of the site’s flood protection system, evaluation of potential future uses, and the preparation of remediation and building demolition opinions-of-cost for several industrial/commercial and residential reuse scenarios. The study included Key Project Experience Robert Carr PE, LEP Environmental 38 Years of Experience | 2 Years with the Firm Robert has extensive experience conducting and overseeing environmental projects, including all phases of environmental site assessments, release investigations, closure assessments of underground storage tanks (USTs), and the design and permitting of soil and groundwater remediation systems. He also has experience in the design and installation of remediation systems, including soil vapor extraction, chemical oxidation, bioremediation, and air sparging. Robert has completed several types of engineering opinions-of-cost for the cleanup and improvement of various industrial and commercial facilities. Title Senior Technical Leader Office Location Rocky Hill, CT Education 1993, Bachelor of Science Environmental Engineering University of Hartford, Connecticut 1987, Bachelor of Science Civil Engineering Worcester Polytechnic Institute Registrations/Certifications Professional Engineer: CT No. PEN.0018567 NY No. 73889 RI No. 7563 Licensed Environmental Professional: CT No. 314 OSHA 29 CFR 1910.120(e)(3)(i) 40-Hour HAZWOPER OSHA 29 CFR 1910.120(e)(8) 8-Hour Annual Refresher OSHA 29 CFR 1926 10-Hour Construction Safety & Health
Page 594
westonandsampson.com substantial community outreach including stakeholder interviews and three public meetings. CH Nickerson – MDC South Hartford Conveyance and Storage Tunnel Pump Station (Contract No. 3), Connecticut. Served as the Qualified Environmental Professional (QEP) for the MDC’s three year long, $160M wastewater tunnel pump station project. Prepared the project’s Soil Management Plan (SMP) and conducted PCB soil investigations per TSCA regulations, waste characterization of soil and fill (total volume expected to be over 30,000 cubic yards) and reviewed project compliance with applicable stormwater and construction dewatering permits. ExxonMobil Service Station, Danbury, Connecticut. Served as lead investigator in evaluating degree and extent of gasoline release into the bedrock aquifer in the vicinity of private drinking water wells. The investigation included borehole logging to identify contaminant carrying fracture zones and the 1st time use of a FLUTEtm Liner in the State to sample the contaminant fracture zones and prevent cross-fracture contamination. Also responsible for remedial system design of dual extraction bedrock treatment system. Goodwin College Riverside Drive Campus, East Hartford, Connecticut. Provided LEP and asset recovery services to clean up and redevelop four former petroleum terminals and jet engine laboratory into Goodwin University’s Riverside Campus and two magnet high schools. Conducted and managed the environmental investigation and remediation of ecologically sensitive areas along the Connecticut River in East Hartford. Assisted in applying for and managing three U.S. EPA remediation brownfields grants awarded to Goodwin College. Assisted in providing an eligibility case for each site, the community relations plan, and completed the technical portions of ACRES reporting updates. Prepared Quality Assurance Project Plans (QAPPs) to demonstrate compliance with the Connecticut Remediation Standard Regulations (RSRs). (with former employer) Pathways Academy for the Advancement of Design and Technology, East Hartford, Connecticut. Designated LEP for the environmental investigation and remediation of the former industrial property that is occupied by a new regional high school. Oversaw the completion of the Phase I, II and III environmental site assessments (ESAs) for the property which identified areas of pesticide and petroleum contamination. LEP services included oversight and confirmation of the excavation and disposal of contaminated soil to meet residential clean- up standards, and LEP Verification of the site under the CT Transfer Act. (with former employer) Hamilton Place I, Hartford, Connecticut. Providing LEP and environmental engineering services as part of site redevelopment for this industrial property in the Parkville District. Under CT’s Property Transfer Law, conducted Phase III site investigations to assess the degree and extent of soil and groundwater contamination, and prepared a mitigation plan to address chlorinated VOCs, and petroleum products beneath the building. Prepared plans and specifications for removal of contaminated soil and the installation of sub-slab depressurization system (SSDS) that allowed the building to be safely redeveloped and occupied by mix-use tenants. RGH Bartholomew, LLC, Hartford, Connecticut. Providing LEP and environmental engineering services as part of site redevelopment for this mostly vacant industrial property in the Parkville District. Conducted a Phase I/II ESA for the property and assisted the owner with applying for available Brownfields Assessment grants through CRCOG. Once the Phase III ESA is completed, prepared a remedial action plan (RAP) to remediate the property for site redevelopment. 243 Vergason Avenue, Norwich, Connecticut. Providing CT LEP services and prepared Phase II and III environmental site assessments (ESA) for a former medical supply manufacturing facility. The ESA included the collection of soil and groundwater samples to evaluate areas of concern (AOC) identified on the property. Also prepared the Remedial Action Plan and remediation opinions-of-cost to establish the environmental escrow between buyer and seller. LEP services to date have included assistance with CT Property Transfer Law Form III, preparation of an environmental condition assessment form (ECAF) and RAP. (with current and former employer) Robert Carr's Key Project Experience Cont.
Page 595
westonandsampson.com John Zbell LEP, PG, CPG Environmental 27 Years of Experience | 5 Years with the Firm John has extensive experience conducting and overseeing investigations of soil and groundwater impacted by various contaminants; soil management and disposal planning; underground storage tank closure; and landfill monitoring. He has led multidisciplinary project teams on a variety of environmental projects for private sector, state, and municipal clients. He has developed remedial action plans and designed, permitted, installed, and maintained various soil and groundwater remediation systems. John has also been responsible for estimation of long-term environmental liability and cost estimation. Key Project Experience City of Hartford Department of Public Works, Hartford, Connecticut. Project manager responsible for an investigation to evaluate soil and groundwater quality adjacent to existing UST systems planned for removal, and soil quality in the area of a proposed AST system. Following discovery of PCB-impacted soil at the property, assisted with the preparation of a letter summarizing the applicability of state and federal regulations when managing this material. Developed a proposed remedial action plan to address petroleum-impacted soil near the existing UST system. Assisted project team with preparation of bid plans and specifications for planned petroleum tank replacement activities, including management of contaminated soil. Coordinated environmental monitoring activities during AST system construction and UST system closure, and updates to the CT DEEP ezFile and REACT online portals. New Milford Public Schools, New Milford, Connecticut. Project manager/client manager responsible for coordinating with the school district to manage their above and below ground fuel storage facilities and comply with applicable state and federal regulations. Following an inventory survey and inspection of each fuel system, completed alongside a licensed tank contractor, a database was created that summarized the status of each system, including key observations, and recommendations for achieving and/ or maintaining compliance with applicable regulations. At one facility that was subject to a CT DEEP Notice of Violation (NOV) for noncompliance with life expectancy requirements under the CT UST Regulations, the project team worked with the school district to permanently close Title Team Leader Office Location Rocky Hill, CT Education 1998, Bachelor of Science Geology Dickinson College Registrations/Certifications Licensed Environmental Professional: CT No. 531 Professional Geologist: NY No. 731 Certified Professional Geologist: American Institute of Professional Geologists No. 11341 OSHA 40-Hour HAZWOPER OSHA 8-Hour HAZWOPER Refresher OSHA Supervisor Training, 8-Hour HAZWOPER
Page 596
westonandsampson.com the UST system and satisfy the requirements of the NOV. UST closure activities included conducting a pre-closure environmental investigation, environmental monitoring and contractor oversight during removal of the UST system, preparation of a UST Closure Report, and updating the CT DEEP ezFile system. At another facility, the team conducted a feasibility analysis for replacement of the heating-oil UST system, prepared bid plans and specifications for planned petroleum tank replacement activities and is preparing to oversee UST system closure activities. Retail Petroleum Sites, Various Cities/Towns, Connecticut. Project manager/client manager responsible for investigation and remediation of petroleum-impacted soil and groundwater at over 30 current and former retail gasoline stations entered into various CT DEEP cleanup programs. Coordinated and supervised Phase I, II, and III investigations, sensitive receptor surveys, UST closure activities, sampling and maintenance of granular activated carbon (GAC) treatment systems on potable water- supply wells, and remediation, as necessary, with milestone application submittals to the CT DEEP UST Petroleum Clean-Up Account Program. Remediation activities included design, permitting, installation and operation of various types of remediation systems, including soil vapor extraction/air-sparge, multi-phase extraction, oxygen gas-diffusion, chemical injection, and remedial excavation, dewatering and groundwater reclassification. (with current and former employer) Sampling of POTWs, Various Cities/Towns, Connecticut. Project manager/client manager responsible for implementing a CT DEEP-sponsored sampling program to evaluate concentrations of per- and polyfluoroalkyl substances (PFAS) at 35 publicly owned treatment works (POTWs). Activities included coordinating the collection of influent, effluent, and sludge samples at the POTWs during two different seasonal sampling events. The scope of work also included the collection of surface-water and fish tissue samples from nearby surface water bodies at 10 of the locations. Following review and analysis of the data, worked with project team to prepare a comprehensive report summarizing sampling and analytical methods, laboratory results, a discussion of the data, and recommendations for future actions. Petroleum Bulk-Storage Terminal, Bantam, Connecticut. Project manager/client manager responsible for investigation and remediation of petroleum-impacted groundwater to successfully abate a Significant Environmental Hazard resulting from proximity of nearby private water-supply wells. Project activities also included the preparation of an updated SWPPP for the facility and coordinating inspections, sampling, and reporting to comply with SWPPP, SPCC plan, and CT DEEP permit requirements. (with former employer) South End Drainage Study, Stratford, Connecticut. Project manager responsible for assessment of soil quality prior to planned realignment and widening of stream channel in connection with proposed drainage improvements. Soil samples collected from test borings completed in proposed excavation areas were submitted for laboratory analysis for constituents common in industrial fill. The laboratory results were reviewed to determine soil quality and options for management, including reuse in accordance with the CT DEEP Remediation Standard Regulations and/or offsite disposal. Prepared a memo summarizing the results of the soil quality evaluation and options for managing the excavated material. Manchester Landfill, Manchester, Connecticut. Project manager/client manager responsible for managing environmental and engineering-related services at an active municipal solid waste landfill. Permit-required environmental monitoring tasks included quarterly groundwater and surface-water monitoring, and leachate seep inspections/sampling under a CT DEEP Discharge Permit, as well as surface methane emissions monitoring under an EPA permit. Managed staffing, budgeting, client coordination, and technical review for the preparation of quarterly and annual summary reports documenting the environmental monitoring activities and findings. Also managed multi-disciplinary team activities related to monitoring and operational optimization of the methane gas collection system. Managed operation, maintenance, and repairs to methane gas flare system and associated leachate condensate collection system. Coordinated quality assurance inspections and Title V compliance monitoring and reporting. Worked with the project team to coordinate stormwater inspections, sampling, and reporting in accordance with CT DEEP permit requirements. Oversaw review and approval of applications for acceptance of Specialty Waste under a CT DEEP permit. Worked with project team to provide additional environmental and engineering support services, as needed, including expansion of gas collection system and evaluation of landfill filling practices. John Zbell's Key Project Experience Cont.
Page 597
westonandsampson.com Tufts University, Medford, Massachusetts. Led the aquatics team in the design of a new 50-meter stretch competition facility from concept through construction documents under a design-build delivery method. The design features split bulkheads, 1-meter and 3-meter diving, deck level gutters, a state-of-the-art competition timing system, and panelized stainless steel pool technology. University of Pennsylvania, Philadelphia, Pennsylvania. Led the aquatics team in the renovation of a 50-meter competition facility during the construction phase. The scope of renovation included a new retractable bulkhead, new deck level stainless steel gutters, a new pool entry stair, main drains and piping, and new energy and water efficient recirculation and treatment equipment. Lincoln Park Pool Renovations & Reconstruction, Albany, New York. Led the aquatics team for design of new pool layout, including a zero-entry pool with spray equipment, while integrating accessibility, sustainability, and modern safety standards. Project also included replacement of the existing pool body (listed on the State and National Register of Historic Places) and construction of a new auxiliary bathhouse and filter building. Hommocks Outdoor Pool, Mamaroneck, New York. Led the aquatics team for the design and planning through the construction of a pool facility. Key design elements included a zero-depth entry pool, splash pad, new restroom and locker facility, shade structures, site amenities, and reconfigured driveway access and parking areas. Key Project Experience Patrick Bates AIA, NCARB Aquatics 23 Years of Experience | 2 Years with the Firm Patrick has experience working on multi-disciplinary project teams involving the design and management recreational facilities, mixed-use developments, and commercial interior projects. His experience primarily involves the design of aquatic facilities, including indoor, outdoor, and rooftop pools; splash pads; spas; and steam and sauna facilities. Title Practice Leader Office Location Suffern, NY Education 2004, Master of Architecture University of Florida 2002, Bachelor of Design Architecture University of Florida Registrations/Certifications Registered Architect: PA No. RA410770 CT No. ARI.0015739 FL No. AR95050 NY No. 034621-01 NJ No. 21AI02283100 DE No. S5-0019348 MD No. 22041 ME No. ARC5840 NH No. 05412 NV No. 9508 RI No. 5946 SC No. AR.11799 TX No. 31946 MA No. 954552 VT No. 003.0134731 VA No. 0401020794
Page 598
westonandsampson.com Brian J Slavin Pool Complex, Shrub Oak, New York. Led the aquatics team for the design of gutter replacement for four outdoor pools, including a lap pool, diving well, wading pool and activity pool. The project included the development of multiple gutter replacement options for competitive bidding. Glen Mary Pool, Bar Harbor, Maine. Led the design and planning of a large ovular outdoor wading pool complex that is also used for winter ice skating. Key design elements included a wide beach entry, spray features, deck areas, additional toilet facilities, and shade structures. Greater Plymouth Community Center, Plymouth Township, New Jersey. Led the construction administration of a full equipment replacement project for three indoor pools, including a lap and diving pool, a large family activity pool, and a whirlpool spa. The equipment features energy efficient pumps, water efficient regenerative media filters, ultraviolet sterilization, and pool water heating through the recapture of dehumidification heat rejection. Hillside Park, Philadelphia, Pennsylvania. Led the design of a pool replacement project for the City of Philadelphia Parks and Recreation. An initial assessment revealed that the pool was beyond salvage and needed replacement. The new design includes a recessed stair alcove and supports youth swimming competition. North End Community Center, Boston, Massachusetts. Led the aquatics team for the design and planning of new recreation center for the City of Boston Public Facilities Department. The aquatic program included two pools; an outdoor recreation pool and an indoor lap pool. The planning phase included the development of multiple scenarios for accommodating the program on the waterfront site. Pennsauken Pool, Pennsauken, New Jersey. Led the aquatics team for the design and planning of a new multi-purpose pool and splash pad facility. Key design elements included a beach entry, splash pad, water slide, lap lanes, and diving area, along with all new equipment and piping. Roy Wilkins Recreation Center, Queens, New York. Led the aquatics team for a design competition for a new City recreation center. The pool featured eight competition lap lanes, 1 meter dive stands, and was configurable to water recreation activities such as volleyball, basketball, and water polo, as well as aquatic fitness, and learn to swim programs. Indoor Aquatic Facility at The Youth Opportunity Union, Poughkeepsie, New York. Provided design, engineering, and project management services for an indoor aquatic facility within a proposed $50M community recreation center. The facility includes an eight lane, 25-yard competition pool and an adjacent family pool. Both pools feature concrete construction, regenerative filtration, and fully recessed stainless-steel gutters with integrated evacuator system for removal of harmful disinfection byproducts at the water surface. (with former employer) Municipal Pool Complex, Scarsdale, New York. Conducted a facility survey and prepared an existing conditions assessment, and scoping report. Administered a community-wide survey and conducted community engagement sessions. Reported on survey data and feedback. Administered a market assessment. Developed reconstruction concepts and presentation to the community at a public meeting. (with former employer) Rooftop Amenity Pool at One Java Street, Brooklyn, New York. Designed a new 800-square- foot outdoor rooftop amenity pool for a new mixed-use development on the Brooklyn waterfront. This first of a kind large scale urban development utilizes 100% geothermal technology to heat and cool the building. The pool is constructed of fully welded stainless steel on steel dunnage and is heated with two 10-ton water source heat pumps. The pool features an underwater bench and is finished in ceramic tile. Secured Department of Health application approval. (with former employer) Stainless-Steel Rooftop Amenity Pool at One Dock Street, Stamford, Connecticut. Provided design, engineering, and project management services for a new stainless-steel rooftop amenity pool for a high-rise residential development project. Coordinated the aquatics design with architectural, structural, MEP, and landscape disciplines. Secured Department of Health application approval. Performed progress inspections. (with former employer) Indoor Lap Pool & Whirlpool Spat at One High Line, New York, New York. Provided construction administration services for a two-lane indoor lap pool and whirlpool spa in a new mixed-use high-rise development. Facilitated Department of Health permit issuance. (with former employer) Patrick Bates's Key Project Experience Cont.
Page 599
westonandsampson.com Byram Park Pool Replacement, Greenwich, Connecticut. Led the aquatics design aspects related to the design and engineering of a new park and public outdoor pool facility with a large zero-entry pool with lap lanes, a splash pad, and a kiddie pool to replace an outdated facility on the site. Children’s Aquatic Center at Chelsea Piers, Stamford, Connecticut. Provided aquatics design services for a 6,000 square-foot water play pool, including three giant slides, a zero-depth entry area, mini water slides, and interactive play features. John F Kennedy Memorial Park, Barnstable, Massachusetts. Lead aquatic designer for the strategic restoration of John F. Kennedy Memorial Park. Managing the design of significant upgrades to the ornamental pool and fountain, including creative renovation/restoration strategies that respect the original design and appropriately honor the beloved past president. Menotomy Hunter Fountain Evaluation, Arlington, Massachusetts. Team leader for the evaluation of the Menotomy Hunter Fountain and adjacent reflecting pool in the Winfield Robbins Memorial Garden. Responsible for working with the Historical Commission to determine the extent and type of repairs required to appropriately renovate the historic bronze statue created by sculptor Cyrus E. Dallin in 1911 and the leaky reflecting pool. Key Project Experience Timothy Sheehan CPO Landscape Architecture 30 Years of Experience | 1 Year with the Firm Tim is a landscape architect and aquatics designer who provides design, production, and project management services for a large variety of projects, including high-end residential, resort and hospitality, water parks, large-scale residential communities, and municipal and commercial properties. Title Director of Design Office Location Boston, MA Education 1995, Bachelor of Science, cum laude Landscape Architecture University of Massachusetts at Amherst Registrations/Certifications Commercial Pool Operator: No. 466965
Page 600
westonandsampson.com George Robert White Memorial Fountain Restoration, Friends of the Public Garden, Boston, Massachusetts. Responsible for providing aquatic design/landscape architectural services to restore the mechanical function of the George Robert White Memorial Fountain at the Public Garden. Worked with a multi-disciplinary team to design, permit, and complete the preservation and restoration work of the historic fountain, which was originally constructed in 1924. Worcester Common WWII Memorial Fountain, Worcester, Massachusetts. Provided aquatic design/landscape architectural services related to the development of a $600,000 decorative fountain at Worcester Common. The fountain project involves development of an intricate series of water jets; specialized lighting; two large granite piers engraved with the names of the 678 Worcester residents who perished in the war; decorative iron fencing; interpretive signage; and landscaping. Tufts University Pool Capital Improvements and Renovations, Medford, Massachusetts. Led the aquatics design for the Tufts University pool renovations, including design and compliance upgrades for this large municipal pool. Project work included bringing the swimming and wading pools into compliance with the Virginia Graeme Baker Act, providing engineering for a chemical feed system, updating the hydraulic system, and making compliance upgrades around the deck of the pool and in the filtration facility. Basquil-Sheehan Park and Hunt Memorial Pool Master Planning Services, Manchester, New Hampshire. Team leader for the preparation of a master plan, including alternative schematic plans showing the redevelopment possibilities for the southern portion of the Basquil-Sheehan Park property, cost estimates, and phasing considerations. Facility components included a new aquatic facility and a variety of other recreational elements, including a lap pool, spray deck, facility support buildings, improved access and visibility, a skate park, children’s playground, pickle ball courts, and new parking areas. Bulfinch Crossing (formerly Government Center Garage) Rooftop Pool, HYM Investment Group, Boston, Massachusetts. Provided aquatic engineering services for stainless steel rooftop pool in the heart of downtown Boston near Government Center designed in conjunction with CBT Architects. Provided construction drawings and specifications for pool. Residences at Boston Landing Pool, HYM Investment Group, Brighton, Massachusetts. Provided aquatic engineering services for stainless steel rooftop pool designed in conjunction with Elkus Manfredi Architects. Provided construction drawings and specifications as well as construction administration for this pool at New Balance Corporation’s new mixed-use sports, commercial, and residential development. YMCA Aquatics Facilities, Various Locations, Massachusetts. Providing design services for aquatics facilities at the YMCAs in Lynn, Framingham, and Attleboro, Massachusetts. Albany Street Rooftop Pool, Boston, Massachusetts. Aquatic designer for the fully-tiled 500-square foot heated rooftop pool facility that includes a remote equipment room with an automated control system for a high-rate sand filter, UV treatment, and gas heater. Millennium Tower Pool, Boston, Massachusetts. Aquatic designer for an indoor swimming pool and spa at the high-rise Millennium Tower. The pool was set with a crane and rigging crew in the middle of winter to keep the 60-story building construction on schedule. Laguna Splash Water Park at DelGrosso Amusement Park/Water Park Expansion, Tipton, Pennsylvania. Aquatic designer for site design/ layout and renovations including a wave pool/lazy river feature with themed building/support structures and spray features that reflect the family’s Italian heritage. Designed improvements to enable the DelGrossos to provide family-based entertainment at a multi- generational recreation facility. Boston Bruins Therapy Pools at the Warrior Ice Arena, Brighton, Massachusetts. Aquatic design for three therapy pools. Responsible for coordination with the training staff to ensure the pools met their physical training needs; coordination with the architect, owners, and MEP tradespeople. The design included coordinating and working with the pre-manufactured stainless steel pool company, and designing a complete filtration system to meet the demands. Timothy Sheehan's Key Project Experience Cont.
Page 601
westonandsampson.com Community Center Splash Pad Maintenance Building, Newtown, Connecticut. Lead architect for the design of a new maintenance building to support the new splash pad at the Newtown Community Center. Building includes a restroom, mechanical equipment room, and storage area. Memorial Pool Feasibility Study, Simsbury, Connecticut. Project architect for development of a feasibility study for renovations to an existing park restroom & storage facility to support a new splash pad & playground area. District-Wide Renovations and Additions to Various K-12 Buildings, New York. Provided architectural design and construction administration services for various K-12 school buildings and facilities throughout New York State, including: • Beacon City School District • Wappingers Central School District • Hunter - Tannersville Central School District • Ravena-Coeymans-Selkirk Central School District Wappingers Central School District, Fishkill Plains, New York. Responsible for the design, construction documentation, and administration of an 18,530-square-foot transportation facility, including a vehicle repair shop with a washbay and administration wing. Key Project Experience Brian Gottschalk RA Architecture, Programming & Design 24 Years of Experience | 4 Years with the Firm Brian has experience designing and administrating educational, commercial, and public works projects. He has demonstrated expertise in leading multi-disciplinary teams through all phases of project development, from conceptual design through construction administration. Brian’s proficiency in leveraging advanced design software to streamline project workflows and enhance collaboration has led to impactful design solutions in renovation and new construction projects. Title Team Leader Office Location Rhinebeck, NY Education 2001, Bachelor of Arts Architecture State University of New York at Buffalo Registrations/Certifications Registered Architect: NY No. 032385 CT No. ARI.0016350 OSHA 10-Hour Construction Safety & Health
Page 602
westonandsampson.com Hudson City School District, Hudson, New York. Assisted in the design and construction documentation of a new 20,200-square-foot pre-K through fifth-grade elementary school. Additions included classrooms, offices, a library, and a gymnasium. Anderson Center for Autism, Hyde Park, New York. Provided architectural design and construction documentation for campus ADA accessibility upgrades and facility improvements. Dutchess Community College, Poughkeepsie, New York. Project architect responsible for the design and construction documentation of roofing replacements at five campus buildings along with general site improvements including sidewalk, staircase, and railing replacements. Currently responsible for design of improvements to the parking garage located on campus. Department of Public Works Facility, Ardsley, New York. Assisted in the planning, design, and technical coordination of all disciplines for the Village of Ardsley’s new public works facility. Provided final architectural design and construction documentation utilizing building information modeling software. New Department of Public Works Facility, Colonie, New York. Responsible for providing construction administration services for construction of a new 9,000-square-foot operations facility for the Division of Pure Waters. Moakley Park Operations & Maintenance Facility, Boston, Massachusetts. Designed a Net Zero Carbon building incorporating sustainable and passive design strategies. Collaborated with the landscape design team to integrate the building with the redesign of the park landscape. Brian Gottschalk's Key Project Experience Cont.
Page 603
westonandsampson.com On-Call Mechanical/Electrical/Plumbing Services, Groton, Connecticut. Project manager for mechanical, electrical, and plumbing services for generator and pumping station upgrades for the Town of Groton. On-Call Mechanical/Electrical/Plumbing Services, University of Connecticut. Project manager for mechanical, electrical, and plumbing upgrades and improvements for the University of Connecticut. Public Works Facility, Bloomfield, Connecticut. Senior mechanical engineer responsible for overseeing the design of code related safety improvements such as full fire sprinkler protection and updated Mechanical Systems including HVAC and CO/NO2 gas extraction for this DPW facility upgrade. Byram Park Pool, Greenwich, Connecticut. Senior mechanical engineer for the complete electrical design for a new pool and splash pad. Electrical design consisted of new electrical service to the site, power, lighting and fire alarm systems to the pool equipment room and to the restrooms and kitchen areas as well as a completely new grounding and bonding plan for the pool and splash pad. Town Hall HVAC Update, Stonington, Connecticut. Project manager for services to update the historic Town Hall’s HVAC systems, including an existing conditions analysis and design solutions including a new high- efficiency, gas-fired, condensing boiler system and high- efficiency, air-cooled chillers. All work will be done in a manner to preserve the historic character of Stonington Town Hall. Key Project Experience Scott Henriques PE, LEED AP® O+M, CEM MEP 32 Years of Experience | 12 Years with the Firm Scott specializes in mechanical, electrical, plumbing/fire protection, and communication technology projects, and has designed numerous central heating and chiller plants, as well as HVAC systems for a variety of clients. He has expertise in analyzing and implementing energy-efficient systems and has helped clients increase system efficiency with substantial cost savings. Scott brings a hands-on perspective to mechanical systems design and has successfully managed projects totaling more than $200 million in construction. Title Senior Team Leader Office Location Foxborough, MA Education 1993, Bachelor of Science, cum laude Mechanical Engineering University of Massachusetts, Dartmouth 1985, Graduate Naval Nuclear Power School 1984, Graduate Advanced Machinist Mate School Registrations/Certifications Professional Engineer: CT No. PEN.0030722 FL No. 96951 ME No. 13850 MA No. 40721 NH No. 14582 NY No. 094392-1 RI No. 0013159 SC No. 41544 TX No. 137349 LEED AP® Operations +
Page 604
westonandsampson.com Yarmouth Department of Public Works Facility (DPW), Yarmouth, Massachusetts. Senior HVAC engineer for this approximately 40,000 SF new state-of- the-art DPW. The DPW primarily consists of a vehicle maintenance bay, vehicle storage area, various shops, locker rooms, and an administration wing. Heating for the facility is provided by a 2 million BTH high- efficiency, gas-fired, condensing boiler plant. Cooling for the administration wing is a high-efficiency, split DX condensing unit supplying and 6,000 CFM indoor VAV air handler. The vehicle maintenance bays are heated by a hot-water radiant floor heating system, ventilated by a 9,000 CFM heat recovery unit, and supported by a dedicated vehicle exhaust system and high-volume low-speed ceiling fans. The shops and vehicle storage are heated and ventilated by dedicated hot water heating and ventilating units. The vehicle maintenance, vehicle storage areas, and shops are protected with a CO/NO gas detection system which initiates an automatic purge and/or alarm upon detection of noxious gases. The entire facility’s HVAC system is controlled by a web-based DDC building management system. New Public Works Facility, Longmeadow, Massachusetts. Provided mechanical, electrical, and plumbing services for a new public works facility, which includes office/office support space, employee facilities (locker/shower/toilet/break and training), trade shops, vehicle maintenance, vehicle wash, salt shed, fueling facility, and vehicle and equipment storage areas. Incorporated sustainable design elements including natural daylighting, heat recovery, smart lighting controls, and a solar-ready roof. Boston University Pool, Boston, Massachusetts. Senior mechanical engineer for the assessment and design of the university’s pool improvements project. The project included a holistic approach to identifying the source of contamination including pool water samples and a complete natatorium HVAC system evaluation. Design and installation of an integrated UV system to add a higher level of sanitary filtration. Lynn YMCA, Lynn, Massachusetts. MEP manager as part of a team responsible for MEP/FP and aquatics design services for this 70,000-square-foot YMCA in Lynn, which will have a ~8,700-square-foot natatorium with lap and teaching pools and a splash pad. Natatorium HVAC Deficiencies, Boston University, Boston Massachusetts. Senior technical advisor for the complete reconfiguration of the poorly performing natatorium HVAC system. The existing system was short circuiting, conditioning air directly from high supplies to high returns therefore not properly ventilating and conditioning the space. This was the main cause of the systems’ inability to properly dilute and remove chloramine contamination which is a health hazard to both the swimmers, divers, and spectators. The solution involved a complete redesign of the air distribution system with special care given to ensure the high temperature supply air reached the occupied pool and deck without exceeding the recommended 30 FPM deck velocity and a substantial portion of the return side of the system was reconfigured as very low returns. The project utilized computational fluid dynamics analysis (CFD) to verify the new designs effectiveness was successful. HVAC Upgrades at Boston University | CARB-X (Sub to Beacon Architectural Associates), Boston, Massachusetts. Services for the renovation/ build-out of office space, including evaluation of existing condition of mechanical, plumbing, electrical power, lighting, and fire alarm systems. Plans and specifications for plumbing, HVAC, and electrical systems, as well as bid period and construction administration services. ASHRAE Level II Audit, Preliminary Design, and Construction Oversight, Roxbury Community College, Roxbury, Massachusetts. Senior mechanical engineer for the ASHRAE Level II energy and water audit, preliminary design, and construction oversight of this ESCo project. Recommended measures included updated HVAC systems lighting, lighting controls, energy management system, domestic water fixture replacement, variable frequency drives, electric metering and monitoring systems for management purposes. Key measures were the 900 MW of solar PV, and integration of a 125-well geothermal heat pump system. Scott Henriques's Key Project Experience Cont.
Page 605
westonandsampson.com Byram Park Pool, Greenwich, Connecticut. Provided complete electrical design for a new pool and splash pad. Electrical design consisted of new electrical service to the site, power, lighting and fire alarm systems to the pool equipment room and to the restrooms and kitchen areas as well as a completely new grounding and bonding plan for the pool and splash pad. Lincoln Park Design Services, Somerville, Massachusetts. Team leader and senior electrical engineer for the upgrades to the park. Upgrades included a new electrical service, new sports lighting and pedestrian lighting. Provided all coordination with the electric utility. Provided a new bonding system for the splash pad. DCR Massasoit State Park, Taunton, Massachusetts. Project consisted of upgrades to the electrical utility infrastructure throughout the campground. Provided detailed design for the electrical utility power throughout the campground, including all new electrical duct banks and transformers. Delivered power and communications to each of the campsites. Langone Park & Puopolo Playground, Boston, Massachusetts. The project consisted of lighting and power upgrades to the park. Provided detailed design for the new incoming electrical utility services for the power to the park, sports lighting, pedestrian lighting, and throughout the site. Key Project Experience Daniel Marchand MEP 28 Years of Experience | 11 Years with the Firm Dan is experienced in the design of electrical systems for a wide variety of facilities, including wastewater and water treatment plants, colleges, laboratories, industrial, retail, mixed-use, municipal, healthcare, education, and others. He has worked on projects from conception through construction, collaborating closely with clients. His expertise extends to all aspects of project design, including system evaluations, load calculations, equipment sizing, code review, specification development, and construction administration. Title Team Leader Office Location Manchester, NH Education 1997, Bachelor of Science Electronic Engineering Wentworth Institute of Technology
Page 606
westonandsampson.com Harambee Park Master Plan, Dorchester, Massachusetts. Project consisted of upgrades to the Harambee park. Upgrades were completed in multiple phases. Provided design for multiple electrical utility services coming into the park, power to sports lighting, power to pedestrian lighting, power to splash pad, and the relocation of existing utility service to accommodate one of the sports fields. Provided communications throughout the park via a town-wide fiber optic system. Boston Parks & Recreation Department (BPRD) Malcolm X Park Refurbishment, Boston, Massachusetts. Upgrades to the park were completed in multiple phases. Provided detailed design for multiple electrical utility services coming into the park, power to sports lighting, power to pedestrian lighting, power to splash pad, the relocation of existing utility service to accommodate one of the sports fields and provided communications throughout the park via a town-wide fiber optic system. Boston Parks and Recreation Ryan Playground, Boston, Massachusetts. Team leader for the upgrades to the Ryan playground. Upgrades included a new electrical service, new sports lighting and pedestrian lighting. Provided all coordination with the electric utility. Prescott Park Phase 1 Final Design, Portsmouth, New Hampshire. Project consisted of upgrades to the electrical utility infrastructure throughout the park. Provided detailed design for the incoming electrical utility power to the park and all new electrical power throughout the park which included power to several existing buildings, power to the docks, and power for a theatrical stage. Burlington Department of Public Works Facility (DPW), Burlington, Massachusetts. Team leader and senior electrical engineer for this new state-of- the-art DPW. The DPW primarily consists of a vehicle maintenance bay, vehicle storage area, various shops, locker rooms and administration wing. Services included new Fire Alarm system, New wiring for all HVAC, Plumbing and industrial equipment, Access control system, lighting and lighting controls to meet the latest energy codes. Newton Highlands Playground, Newton, Massachusetts. Team leader for the upgrades to the Newton Highlands playground. Upgrades included a new electrical service, new sports lighting and pedestrian lighting. Provided all coordination with the electric utility. Public Works Facility Study & Design, Bloomfield, Connecticut. Provided electrical engineering services for the design of renovations to the existing facility and two major additions, an administration wing and three additional vehicle maintenance bays. Project also included a stand-alone vehicle wash building, canopy structures for outdoor storage of vehicles and equipment, and an above-ground vehicle fueling island with a canopy for a total of 11,000 square feet of new construction. New Department of Public Works Facility, Hopkinton, Massachusetts. Electrical engineer for design of a new Department of Public Works Facility, complete with ground improvements, salt shed, fuel island, and materials storage area. New Public Works Facility, Longmeadow, Massachusetts. Provided mechanical, electrical, and plumbing services for a new Public Works Facility. Facility includes office / office support space, employee facilities (locker/shower/toilet/break and training), trade shops, vehicle maintenance, vehicle wash, salt shed, fueling facility, and vehicle and equipment storage areas. Incorporated sustainable design elements including natural daylighting, heat recovery, smart lighting controls, and a solar-ready roof. New Department of Public Works Facility, Rochester, New Hampshire. Provided mechanical, electrical, and plumbing services for a new Public Works Facility. The facility will incorporate sustainable design elements including natural daylighting, heat recovery, high-efficiency radiant floor and ceiling mounted infrared heating system, smart lighting controls, high-efficiency cooling systems, and a solar- ready roof. Salem Probate and Family Court House, Salem, Massachusetts. Electrical design for the complete renovation of the existing 75,000-square-foot court house including all office areas and court rooms. Building Assessments, Shrewsbury, Massachusetts. Prepared a detailed electrical report of the existing conditions for all electrical systems includ¬ing power, lighting, fire alarm, security, and tel/data within 10 of the town’s buildings, including schools, town hall, police station, and fire station. Daniel Marchand's Key Project Experience Cont.
Page 607
westonandsampson.com Boston City Hall and Plaza Renovations, Boston, Massachusetts. Led Weston & Sampson’s geotechnical design for the 7-acre $70M Boston City Hall Plaza Renovation for the City of Boston Public Facilities Department. Three MBTA Green Line subway tunnels and associated vent structures located under the plaza complicated redevelopment of the site, as did the need for on-site stormwater management. Proposed loads from the plaza on the tunnels (constructed in 1898) and potential associated differential settlement required creative solutions for the proposed improvements. The project included raising grades on the nearly 120-year-old subway tunnels and a new below grade building daylighting on to the street level and cantilevering over the tunnel supported on micropiles. Wayland High School Athletic Facility, Wayland, Massachusetts. Coordinated and observed borings and test pits at two proposed athletic facility sites in support of proposed sports fields, tennis and basketball courts, sports lighting structures, and stadium seating. Prepared boring logs, site plan, and geotechnical recommendations report. Memorial Stadium, Dartmouth, Massachusetts. Provided geotechnical engineering services as part of the comprehensive study and follow-on designs for improvement of Dartmouth Memorial Stadium. Efforts for the phased renovation of the stadium include developing designs for a new turf field, improved lighting, renovated bleachers, a new press box, and new concession and ticket stands, among other site amenities. Key Project Experience Tulin Fuselier PE Geotechnical 26 Years of Experience | 9 Years with the Firm Tulin specializes in geotechnical engineering. Her diverse experience includes providing geotechnical engineering design and construction services for projects ranging from high-rises with up to four levels of below-grade parking to small buildings, various sized bridges, water/wastewater pipelines in urban and suburban areas, levee design following Hurricane Katrina effects, dam rehabilitation, climate resilient design, a pedestrian tunnel in urban setting, and railway extension through metro-Boston. In addition, Tulin is fluent in English, German, and Turkish. Title Practice Leader Office Location Reading, MA Education 2006, Master of Science Geotechnical Engineering Tufts University 1999, Bachelor of Science Environmental Engineering Louisiana State University Registrations/Certifications Professional Engineer: MA No. 47146 ME No. 13327 OSHA 40-hour Hazwoper
Page 608
westonandsampson.com Arborway Bus Facility Modernization, MBTA, Boston, Massachusetts. Lead geotechnical engineer responsible for geotechnical engineering design for a 950,000-square-foot, multi-level bus maintenance facility. The first all-electric bus maintenance facility in Massachusetts, this facility will have the capacity to store and maintain 200 buses with a mix of 40- and 60- foot vehicles. Weston & Sampson provided structural, mechanical, plumbing, and resilience design and modeling services in coordination with Jacobs for the conceptual design effort. Contract value is $4,539,000. North Reservoir Dam Rehabilitation, Winchester, Massachusetts. Engineer of Record for Phase II dam investigations and rehabilitation of the 780-foot long, 25-foot tall poor conditioned, HIGH hazard potential earth embankment dam. Investigations included topographic and bathymetric survey; subsurface investigations; hydrologic and hydraulic analyses; geotechnical analyses including seepage, slope stability and liquefaction; alternative analyses; and development of conceptual repairs and associated cost estimates. The design included broadening the embankment crest, flattening, buttressing against liquefaction, armoring the slopes, constructing a two-stage graded seepage filter and embankment toe drain, replacing the gatehouse bridge, wetland replication, repurposing the existing water supply pipe as a low-level outlet, pipe improvements including spray applied epoxy lining, new ductile iron pipe, a new stilling basin and downstream channel improvements, and new gate valves in the gatehouse. Moakley Park Resiliency Improvements, Boston, Massachusetts. Leading the geotechnical design of Moakley Park’s climate resilience and flooding improvements. Moakley Park, a 60-acre waterfront park in South Boston, is prone to flooding with subsurface conditions consisting of very soft clays to 200 feet deep. Design includes up to 20-foot-high berms along the waterfront to function as levees, which will cross over existing, large-diameter, brick stormwater utilities. Currently working on optimal placement and preliminary design of the new levee system. Langone Park and Puopolo Playground Resiliency Improvements, Boston, Massachusetts. Led the geotechnical design of the approximately 4.6-acre waterfront park in Boston’s North End neighborhood. The design included raising site grades by up to 6.5 feet while managing settlement in existing adjacent structures, including the 15-foot-high seawall and buildings. Mill Brook Corridor and Wellington Park, Arlington, Massachusetts. Provided geotechnical engineering support for this flood conditions improvement project. Evaluated/studied the conditions of the park soils and Mill Brook’s banks. Following a team approach on alternatives analyses, led the geotechnical portion of the project solution. North River Canal, Riverwalk, and Park, Peabody, Massachusetts. Geotechnical lead for the rehabilitation of the approximately 1,600-foot-long wall along the southern bank of the North River Canal in the urban industrial section of downtown Peabody. During the first phase of the project conducted a wall repair alternatives analysis to evaluate options to replace the failing canal wall, portions of which are crumbling into the river. The wall condition varied over its length, ranging from “good,” which needs minor or no repairs, to “poor,” requiring full or partial reconstruction. During the second phase, advanced the design of the preferred wall alternative and Riverwalk. City of Boston Public Works Department Climate Resilient Design Standards and Guidelines. Prepared geotechnical resiliency guidelines as part of the Climate Ready Boston initiative to prepare for 40 inches of sea level rise by 2070. Provided geotechnical considerations for design of vegetative berms, raised harbor walks, and raised roadway flood barriers, including considerations for incremental future sea level rise. MWRA Water Sections 50 & 57 and Sewer Sections 19, 20, and 21 Rehabilitation, Medford and Malden, Massachusetts. Lead geotechnical engineer for the rehabilitation of 20,000 linear feet of MWRA water main and 11,000 linear feet of MWRA sewer main in Medford and Malden, Massachusetts. Work includes drilling in urban environments replete with existing subsurface utilities and providing geotechnical recommendations for proposed trenches and access pits, including considerations for existing utility movements during construction. Supervising the geotechnical project manager’s work and reviewing project documents. Tulin Fuselier's Key Project Experience Cont.
Page 609
westonandsampson.com Bartlem Park South Design Documents, Cheshire, Connecticut. Following master plan development, responsible for providing geotechnical engineering support for the completion of Bid Documents for Phase 1 of this phased $14,870,000 master plan to renovate and enhance Bartlem Park. The master plan outlined a range of active and passive recreational improvements, and Phase 1 designs consist of a Great Lawn with a bandshell, paved walkways, a multi-purpose sports field, and additional parking. New Athletic Fields and Playgrounds at Industrial Drive and Dawson Recreation Area Properties, Holden, Massachusetts. Geotechnical engineer responsible for supporting the design and construction of new athletic fields, improved playground amenities, enhanced site access, walking paths, and ancillary facilities as part of the phased approach at the two properties. The Industrial Drive property includes the design of two synthetic turf fields and the Dawson Recreation Area property has a synthetic turf baseball field. McMackin Field Improvements, Revere, Massachusetts. Served as the lead geotechnical engineer for the proposed improvements to the park which included placement of 10 feet of fill below the proposed athletic fields above compressible soils. Coordinated subsurface explorations and prepared geotechnical engineering report with recommendations for fill placement, settlement monitoring; and geotechnical design parameters for proposed retaining walls, field lighting, scoreboard, and maintenance structures. Reviewed contractor submittals during construction. Key Project Experience Jennifer MacGregor PE Geotechnical 31 Years of Experience | 5 Years with the Firm Jennifer has extensive experience coordinating geotechnical exploration programs and providing geotechnical design recommendations for buildings, bridges, retaining structures, tunnels, dams, and levees for public and private clients. She has expertise in planning and coordinating geotechnical site exploration and testing programs; developing design criteria and construction recommendations for deep and shallow foundations systems, ground improvement, and temporary or permanent excavation support systems; evaluation of slope stability; and excavated soil management. Title Technical Leader Office Location Reading, MA Education 1996, Master of Civil Engineering University of Massachusetts, Amherst 1994, Bachelor of Civil Engineering University of Massachusetts, Amherst Registrations/Certifications Professional Engineer: NY No. 084596-1 ME No. 13695 MA No. 45230 CT No. PEN.0025402 RH No. PE.0008580 NH No. 14541
Page 610
westonandsampson.com Malcolm X Park, Boston Parks and Recreation Department, Boston, Massachusetts. Served as the geotechnical engineer for the proposed improvements to the park which included upgrades to the playground, athletic courts, and fields; replacement of retaining walls; and grading changes for improved accessibility. Geotechnical consideration included up to 10 feet of fill below the athletic courts and fields, which impacted design of the associated lights and score board; and exposed bedrock within the proposed playground. Proposed Dock at LoPresti Park, Boston Parks and Recreation Department, East Boston, Massachusetts. A floating dock, secured by piles, is proposed adjacent to the existing pier at LoPresti Park. Advanced borings from a barge within the footprint of the proposed dock to provide subsurface information for design of the piles. Pile design was controlled by the lateral forces imposed by the ocean. Provided geotechnical design parameters for pile design to resist vertical and lateral loads. Design also incorporated considerations for sea level rise and site resiliency. Renovations to McConnell Park, Boston Parks & Recreation Department, Boston, Massachusetts. Provided geotechnical engineering for renovations to this open space resource in the Savin Hill neighborhood of Dorchester. Park improvements involved renovations to an existing ballpark including the synthetic turf Challenger Field and two natural grass ball fields. The site was within a 100-year flood plain and was being utilized for coastal resilience. The effort entailed complex grading, drainage, and site layout to meet the goals of the city. Redevelopment of Ryan Playground, Boston Parks and Recreation (BPRD), Boston, Massachusetts. Provided geotechnical engineering for the redevelopment of Ryan Playground, located on a post-industrial, waterfront site. Efforts to realize the new, resilient park include ground improvements, sea wall modifications, Harborwalk renovation, and a reconfigured site that makes best and highest use of the available land to fend of rising tides. Mary Dennison Park, Framingham, Massachusetts. Provided geotechnical engineering for the design of a recreational complex on a former brownfield property. Project challenges included a complex grading strategy that incorporated a new cap over the contaminated soil. Improvements to Louise Levingston Cove, Newton, Massachusetts. Provided geotechnical engineering for development of improvements to this community park amenity. Work included the design of a cantilevered deck overlooking Crystal Lake, an on-grade deck at the shoreline, and slope stabilization strategies. Prescott Park Phase 1 Improvements, Portsmouth, New Hampshire. Providing geotechnical engineering for the enabling engineering phase of work following the approval of the Prescott Park Master Plan. Currently the project manager for the Phase 1 improvement scope. Work includes managing a multidisciplinary team of architects and engineers and developing a research-based approach to resiliency design that can improve flooding conditions for the neighborhood in the future. Transfer Station Improvements, Winchester, Massachusetts. Geotechnical engineer during design and construction of upgrades to the Town of Winchester transfer station facility. The project will include partial demolition of the former incinerator building, in-situ ground improvement of fill material, permanent sheet pile retaining walls, re-configure facility layout to improve traffic flow and facilitate waste drop-off. Prepared geotechnical engineering recommendations report; and assisted with preparation of contact specifications and drawings. Phase I Dam Inspections and Evaluations, Various Towns, Massachusetts. Engineer of Record for several Phase I dam inspections. Inspections were conducted in accordance with Department of Conservation and Recreation Office of Dam Safety guidelines and included reviews of existing information, visual observations, qualitative hydrologic, hydraulic, and geotechnical analyses, identification of dam safety deficiencies, and recommendations for repair and associated estimated costs. Stream Channel Improvements to Entry Dingle Brook at Tiffany Street, Springfield, Massachusetts. Provided geotechnical services for the hydraulic analysis of the Entry Dingle Brook culvert and channel to prevent slope failure of stream embankments and provide a stable stream channel. Utilized HEC-RAS for the hydraulic model and FHWA HEC-11 computational methods for stream bank erosion and countermeasure design. Jennifer MacGregor's Key Project Experience Cont.
Page 611
westonandsampson.com Weir Village Riverfront Park (former FB Rogers site), Taunton, Massachusetts. Structural engineer responsible for working with Weston & Sampson’s in-house team to fully integrate the design of Weir Riverfront Park with the site cleanup strategy for the former FB Rogers site. The new park sits on the edge of the Taunton River, adding to the city’s open space system. Improvements to Louise Levingston Cove, Newton, Massachusetts. Structural engineer responsible for supporting the development of the preferred plan, as well as design development and bidding. Work includes the design of a cantilevered deck overlooking Crystal Lake, an on- grade deck at the shoreline, stormwater management, slope stabilization strategies, pathway upgrades, and planting areas. New High School Athletic Facility Design & Construction, Danvers, Massachusetts. Provided structural engineering support for the design and construction of a new state-of-the-art athletic complex at Danvers High School, including the primary synthetic turf field at the stadium, a competition-level track, bleachers for 2,600 spectators, lighting systems, a scoreboard, baseball field and multi-purpose field, tennis courts, and other sports and site support facilities/features. Route 1A Athletic Field Complex, Walpole, Massachusetts. Structural engineer for the planning, final design, and construction services for this 30-acre, multi- sport and recreation complex. The new facility includes two full-size multi-sport synthetic turf fields; two full-size natural Key Project Experience Nathan Seifert PE, LEED AP® Structural 31 Years of Experience | 11 Years with the Firm Nathan brings extensive engineering and construction experience. His areas of expertise include reinforced concrete, masonry, structural steel, and timber design, and he is well versed in the International Building Code. His portfolio includes design of new construction and renovation of commercial, multi-unit residential institutional and pharmaceutical/industrial buildings; water/wastewater treatment facilities; and bridges. Title Practice Leader Office Location Foxborough, MA Education 1994, Bachelor of Science Civil Engineering Worcester Polytechnic Institute Registrations/Certifications Professional Engineer: CT No. PEN.0029660 FL No. 79595 SC No. 35047 NC No. 048585 NH No. 16201 NJ No. 24GE05860700 NY No. 108658 ME No. PE17459 MA No. 41693 RI No. 7663 VA No. 67465 VT No. 018.0134531 LEED AP®
Page 612
westonandsampson.com turf soccer fields, overlayed with full-size baseball and softball fields; two basketball courts; a universally accessible playground; a support building; walking paths; parking; and supporting infrastructure. Ireland Street over West Branch Bronson Brook, MassDOT, Chesterfield, Massachusetts. Provided structural engineering services for the replacement of an existing 56-foot single span, steel thru-girder bridge. Responsibilities included performing a bridge type study; developing conceptual bridge plans, evaluating bridge superstructure replacement options of prestressed concrete NEXT beams, steel girders with precast concrete deck panels, and steel girders with shop fabricated concrete decks; and analyzing existing abutments. Water Street over Blackstone River Bridge, Millbury, Massachusetts. Responsible for structural design and construction administration for the bridge substructure and superstructure design for Mass Highway Department. The superstructure was constructed with prestressed concrete box beams. Consolidated Public Works Department Facility, Waterbury, Connecticut. Responsible for structural design and construction administration for a new 120,000-square-foot facility designed to house all public works operations (administration, shops, highway, parks, refuse) plus a central DPW vehicle maintenance shop, and separate shops for maintenance of fire department vehicles, and police department vehicles. The structure was a combination of new pre-engineered and conventional steel additions on an existing steel structure. Substantial structural modifications were performed on the existing building. Municipal Services Facility, Andover, Massachusetts. Responsible for structural design and construction administration for a new 60,000-square-foot public works facility with vehicle storage, vehicle maintenance, and administration areas. The structure was a one- and two-story pre- engineered metal building. DPW Facility Code, Safety, and Operational Improvements, Bloomfield, Connecticut. Responsible for structural design for the renovation of an existing 24,000-square-foot public works facility with vehicle storage, vehicle maintenance, and administration areas. The renovation included 11,000 square feet of additions. The structure was a one-story conventional steel structure. Highway Department Repair and Partial Replacement, Colrain, Massachusetts. Responsible for structural design and construction administration for the renovation of an existing 4,500-square-foot highway department facility with vehicle storage, vehicle maintenance, and administration areas. The renovation included a 2,000-square-foot addition. The structure was a combination of conventional steel, concrete masonry, and wood framing. Department of Public Works Renovation & Addition, Arlington, Massachusetts. Engineer of Record responsible for structural design for the renovation of the historic public works facility and the design of a new vehicle maintenance and administration building. The project involves historic designation, on-site historic contamination, multiple end users, utility easements across the site, a brook running through the center of the site, and budgetary limitations. Department of Public Works and Natural Resources Facility, Orleans, Massachusetts. Responsible for structural design and construction administration for a new 42,000-square-foot public works facility with vehicle storage, vehicle maintenance, and administration areas. The structure was a one- story pre-engineered metal building. New Public Works Facility, Hopkinton, Massachusetts. Responsible for structural design and construction administration for a new 40,000-square-foot public works facility with vehicle storage, vehicle maintenance, and administration areas. Structure was a one- and two-story pre- engineered metal building. Mill Brook Corridor and Wellington Park, Arlington, Massachusetts. Responsible for the structural support of the revitalization of the linear corridor along Mill Brook and Wellington Park. Responsible for the structural design of a new boardwalk. The project also involved site improvements, vegetation management planning, and bank restoration. Nathan Seifert's Key Project Experience Cont.
Page 613
2 Tunxis Road, Suite #214 • Tariffville, CT 06081 Phone: (860) 408-9167 • Fax: (860) 408-9269 • E-mail: brian.denno@gmail.com Denno Land Surveying is a full-service Land Surveying company located in the Tariffville section of Simsbury, CT. Denno Land Surveying has been owned and operated by Brian Denno, L.S. since 2008, when he acquired the existing firm of Nascimbeni and Jahne Surveyors, P.C. Brian Denno is a licensed Land Surveyor with a degree in Civil Engineering with over 39 years of experience in the industry. Prior to establishing his own business, he was with a CT Land Surveying & Engineering firm for 24 years. Previous projects include: The layout and as-built locations of the column lines in terminal A of Bradley International Airport. The layout and as-built of the new safety building and associated parking at Bradley International Airport 2013-2014. The layout of the Building, column lines, utilities, pavement and as-built survey at Brainerd Airport’s new maintenance facility. The layout of over 5,000 VSC (vibratory stone column) and building and column lines for the Amazon building on Kennedy Road Windsor, CT - August 2020. Utility locations, topographic survey of the UPS site at Bradley International Airport. The layout of the new utilities, security fencing and airplane parking at Terminal B at Bradley International. Multiple Farmland Preservation Surveys for the CT Department of Agriculture from 40 acres to over 1,000 acres. Many improvement location surveys of commercial sites, utility surveys for water, sewer, gas and storm water facilities for both municipalities and private developers. Layout and as-builts of over 2 million square feet of warehouse and parking lots in E. Hartford, CT for Lowes and Wayfair – December 2024.
Page 614
CERTIFICATIONS _______________ • PROFESSIONAL SOIL SCIENTIST • PROFESSIONAL WETLAND SCIENTIST KEY SKILLS _______________ • Qualified Herpetologist • State & Federal Permitting • Project Management • Wetland Delineation • DEEP NDDB Compliance • Erosion & Sedimentation Control Inspections & Compliance • GIS Data Development • Connecticut Siting Council Support EDUCATION _______________ BACHELOR OF SCIENCE IN WILDLIFE MANAGEMENT 1999 – University of Massachusetts, Amherst GRADUATE STUDIES, SOIL SCIENCE 2000 – New England Regional Soil Science Certificate Program PROFILE _______________ Eric Davison has been providing wetland and biological consulting services in Connecti- cut since 1999. He is a Wildlife Biologist and DEEP recognized Herpetologist overseeing compliance with NDDB protection measures for State-listed amphibians and reptiles. His experience includes field surveys for amphibians, reptiles and birds, wetland de- lineation, evaluation of wetland functions and values, preparation of wetland impact assessments and permitting documents. Eric also acts as the project manager oversee- ing State-listed plant surveys conducted by Davison Environmental botanists. KEY EVERSOURCE PROJECTS _______________ VEGETATION MANAGEMENT PROGRAM, VARIOUS PROJECTS Provided environmental compliance support for the vegetation maintenance program on over 30 projects since 2018. Performed wetland delineation, vernal pool surveys, managed State-listed plant surveys, and implemented NDDB species protection measures, mitigation and monitoring plans for routine maintenance, TRRP and herbicide work. STRUCTURE REPLACEMENT PROJECTS Since 2016, performed wetland delineation and vernal pool surveys on 40 separate structure replacement projects. Work included field surveys, GIS mapping of regulated resources, and preparation of wetland delineation and vernal pool reports for inclusion in Siting Council Petitions. 310-383 LINE In support of a structure replacement project, oversaw surveys for State-listed plant species and host plants for State-listed invertebrates. Surveys identified rare species locations relative to work areas, developed mitigation plans for impact areas, and conducted multi-year monitoring for rare species in compliance with NDDB Determination conditions. 348-364 LINE Performed wetland delineation, vernal pool surveys and oversaw surveys for State- listed plant species and critical habitats in support of a structure replacement project. Work included assisting with the development of habitat restoration plans and plant mitigation plans, and conducted multi-year monitoring in compliance with NDDB Determination conditions. 📞 (860) 803-0938 💻 www.davisonenvironmental.com 📧 eric@davisonenvironmental.com 📪 10 Maple Street, Chester, Connecticut 06412 ERIC DAVISON PROJECT MANAGER / SENIOR WETLAND SCIENTIST 18
Page 615
Relevant Experience The Weston & Sampson family of companies is actively engaged with all phases of public improvement projects. Our engineering /design company completes study, planning, design, permitting and construction administration for infrastructure projects; our construction / maintenance and repair company actively assists communities in the construction and repair of projects; and our operations company assists municipalities in operating the constructed projects. On the following pages, we have provided project descriptions of similar projects that demonstrate our firm’s ability to perform and complete the work described in ‘Description of Services Needed’, as described in the RFP. Each project includes a client reference whom we invite you to contact to learn more about our capabilities and past performance. \\wse03.local\WSInc\Marketing\_MarketingReso ll Tables\Map Project Highlight: Athletic Field, Watervliet, NY
Page 616
FULL-SERVICE PARKS, SPORTS, AND RECREATION FACILITY SPECIALISTS SPORTS & RECREATION
Page 617
*Member of American Sports Build Association and Sports Field Management Association For more information, contact: info@westonandsampson.com I 800.SAMPSON I westonandsampson.com There are few project sites that are alike, and every project proponent has needs that are unique. Accomplishing projects can be complicated and challenging as communities and owners grapple with a host of questions: ■ Do we renovate or fully reconstruct our facility? ■ Do we need additional facilities? ■ Will we be able to maintain and operate this facility? ■ Should we construct natural turf fields, synthetic turf fields, or a combination? ■ Is synthetic turf safe for our users and the environment? ■ How can we meet our watering/irrigation needs? ■ Would facility lighting pose any challenges or implications? ■ What can we afford? Weston & Sampson can collaborate with you to answer these questions and establish the most appropriate strategy. To support our work and achieve exceptional project results, we maintain a team of skilled sports and recreation facility designers, landscape architects, engineers, and environmental scientists. Our multi- disciplinary support team assists us in delivering smart, sustainable, and technically sound solutions to the structural, geotechnical, lighting/electrical, environmental, and stormwater management aspects of every assignment during every stage of project development from feasibility to construction. SPORTS AND RECREATION FACILITIES THAT STAND UP TO THE COMPETITION
Page 618
Page 619
FIELDS Natural and synthetic turf fields, stadium and bleacher systems, fieldhouses, restroom facilities, sports lighting, and a wide range of ancillary amenities Our field projects are located within school campuses, standalone athletic complexes, historic parks, neighborhood playgrounds, and other types of public and private properties. Weston & Sampson designs new fields as well as renovations to existing fields to fit within the context of their surroundings and to meet the needs of user groups and owners.
Page 620
COURTS New construction, re-construction, and renovation of tennis, pickleball, basketball, handball, volleyball, roller/street hockey, and shared-use courts Weston & Sampson’s court designs also include the refurbishment and replacement of integral sports equipment and infrastructure such as sports lighting, storm drainage, perimeter court treatments, players’ benches, and related site furnishings. Our professionals can also help you select the appropriate surface type (e.g., hard court, clay (for tennis courts), or post-tension concrete).
Page 621
TRACKS Running tracks that support the highest level of competition, as well as walking, fitness, and multi-use trails Since many communities only offer one track facility, our team designs these amenities to accommodate informal, residential use and community/social gathering in addition to organized, competitive events. We help each project proponent determine the most appropriate track surface types and the extent of the facility’s ancillary systems and infrastructure.
Page 622
westonandsampson.com PROJECT SHEETS\Landscape Architecture\Sports and Recreation\CT_North Haven Various Athletic Facility Various Athletic Facility Improvement Projects north haven, connecticut Weston & Sampson has provided landscape architecture, engineering, and construction phase services to the Town of North Haven for several key athletic facility projects, including the Vanacore Running Track, Comprehensive Athletic Facility Master Plan, Turf Field Grandstand, and DeMayo Baseball and Brozek Softball Diamond Field improvements. Our work has included the following: • In coordination with town leadership, the Department of Public Works, Board of Education, and other stakeholders, Weston & Sampson developed a Comprehensive Athletic Facility Master Plan, identifying priority improvements and associated costs. • For the Vanacore Running Track project at the North Haven Middle School, our landscape architects and engineers addressed grading and surfacing deficiencies to meet American Sports Builders Association (ASBA) standards. The $2 million reconstruction included a new track, upgraded field events, LED sports lighting, ADA-accessible walkways, a new scoreboard, and reconstruction of the irrigated grass football field. • Our landscape architecture and civil engineering teams collaborated to complete the Turf Field Grandstand improvement project, which added a 1,000-person grandstand with a press box at the existing turf fields. • For the DeMayo Baseball and Brozek Softball Diamond Field Improvements, Weston & Sampson prepared design and bidding documents for the full renovation of the varsity baseball and softball diamond fields, including relocation of the baseball field, field upgrades, irrigation improvements, new LED sports lighting, scoreboards, precast dugouts, bullpens, and fencing. Client Contact Lynn Sadosky, PE Director of Public Works 203-672-8363 sadosky.lynn@northhaven-ct.gov
Page 623
westonandsampson.com
Page 624
westonandsampson.com PROJECT SHEETS\Landscape Architecture\Master Plans\CT_Cheshire Bartlem Park Project Highlights • high-level athletic field • input from various sports groups in town • public engagement • town recreation resource review • programming & schematic designs • alternatives analysis • final park design Athletic Fields, Bartlem Park South Master Plan cheshire, connecticut The Town of Cheshire selected Weston & Sampson to develop a master plan for a 10-acre addition to Bartlem Park, a 65-acre community hub. The master planning effort for the area known as Bartlem Park South included an inventory of current assets and an analysis of future needs and implementation strategies. Weston & Sampson engaged the community through various methods, including a park planning display at an outdoor event, an online survey, and multiple public meetings with stakeholders. This input helped shape a programming plan and schematic designs. The proposed features for the expanded park included soccer and lacrosse fields, 90-foot baseball diamond, restrooms, pavilion, gathering spaces, parking areas, community pool, splash pad, nature- based playground, skate park, picnic area, community gardens, trail systems, and stormwater management facilities. The full buildout is estimated to cost $14 million, with $7.9 million already authorized for Phase I. Client Contact John Gawlak, CPRP Director Parks & Recreation 475-343-2832 (mobile) 203-272-2743 (office) jgawlak@cheshirect.org
Page 625
westonandsampson.com
Page 626
westonandsampson.com PROJECT SHEETS\Landscape Architecture\Sports and Recreation\MA_Mansfield High School Track + Field Mansfield High School Track & Field Facility Renovation mansfield, massachusetts Weston & Sampson was selected by Mansfield Public Schools to complete renovations and upgrades to the exisiting track and field facilities at the town’s high school. This project was an accumulation of the assessment and recommendations for the site evaluation submitted prior to this construction project. The goal was to renovate and upgrade the existing track and field facilities through design, permitting, and construction. Key features of the project included a full-depth replacement of synthetic turf athletic field with subsurface drainage systems, as well as reconstruction of resilient running track surface. Upgrades to existing athletic field lighting and scoreboard were also made. Improvements also included ADA accessibility to the facility and amenities within the facility and perimeter fencing and spectator seating areas. Additional improvements included replacement of the scoreboard and expansion of the spectator seating areas (bleachers). Client Contact Edward S. Donoghue Assistant Superintendent for Finance & Operations Mansfield Public Schools, MA 508-261-7506 edward.donoghue@ mansfieldschools.com
Page 627
westonandsampson.com
Page 628
westonandsampson.com PROJECT SHEETS\Landscape Architecture\Sports and Recreation\NY_Watervliet New Track + Field Project Highlights • synthetic turf field & track design • elevated bleachers & pedestrian footbridge • sports lighting • construction administration • cost estimating • drainage Junior/Senior High School Synthetic Turf Athletic Field & Running Track watervliet, new york As part of the Watervliet City School District’s facilities improvements project, Weston & Sampson provided engineering design and coordination, landscape architecture, and athletic facility design services for the athletic field and athletic stadium at Watervliet Junior/ Senior High School. The new facility includes: • Six-lane running track with an eight-lane straightaway, inclusive of all events • Multi-purpose synthetic turf field to accommodate football, lacrosse, & soccer sporting events • Elevated bleacher system with precast engineered pedestrian footbridge that extends from the school to the home field bleachers • Concrete retaining wall • Sports lighting to allow for evening events • Design elements to facilitate field drainage Client Contact Dr. Lori Caplan Superintendent of Schools 518-629-3200 x6 “ I am writing to thank and praise everyone involved with the Watervliet project. Needless to say, we are blown away with how it came out...In my opinion, our facilities are the best around, hands down. Between the new gymnasium sitting above the patron plaza below, overlooking the gorgeous field and track, I can’t imagine any other school having such a beautiful setup!” - Michael Foust, Director of Athletics, Jr/Sr High Assistant Principal, Watervliet City School District
Page 629
westonandsampson.com
Page 630
westonandsampson.com
Page 631
westonandsampson.com PROJECT SHEETS\Water\Comprehensive\CT_Aquarion Water Company OnCall Engineering Consulting Over the past two decades, Weston & Sampson has performed more than 100 assignments for Aquarion Water Company under on-call assignments and other project engagements. Task orders and direct assignments have included a wide range of utility, treatment plant, and pumping station services. “ In just a year’s time, Weston & Sampson has performed 10 Task Order assignments for Aquarion Water Company under an on-call contract. Their staff has provided us with high-quality engineer¬ing services on a timely basis… Aquarion Water Company strives to pro¬vide cost-efficient, quality, and responsive services for our capital program, and Weston & Sampson’s staff has worked with us to meet these goals.” - Daniel Lawrence, PE, Director of Engineering & Planning, Aquarion Water Company Project Highlights • design of pumping/ booster stations • design of water main replacements & extensions • site planning/design of new facilities • storage tank and pumping facilities • construction inspection of pumping stations • structural evaluation of process tankage • mechanical & HVAC design • emergency wastewater treatment plant operations • construction services • backflow inspections • coatings & hazardous building materials assessment • equipment repair • operations assistance On-Call Engineering Consulting Services aquarion water company | connecticut Chestnut Tree Hill Pumping Station, Oxford: Engaged in 2017 for the design of a new pumping station facility, Weston & Sampson designed a new below-grade precast concrete chamber that housed the controls, instrumentation, and electrical systems for a duplex booster station on a site in proximity to neighboring homes. The station incorporated a high level of customization that established the standard of construction for similar stations in Aquarion’s system. Our engineering design team worked closely with the operations staff to provide the necessary controls, mechanical systems, and facility configuration desired, resulting in a new state-of-the-art facility that went online seamlessly and without notice to the users of the system. Client Contact Daniel Lawrence, PE Director of Engineering & Planning 203-362-3055 dlawrence@aquarionwater.com
Page 632
westonandsampson.com Treatment Tank Inspections and Rehabilitation, Easton: In 2019, Weston & Sampson was selected to develop a report that documented existing conditions and recommended improvements, including the complete replacement, of the existing Settler and Flocculation Basin at one of Aquarion’s treatment facilities. Observations were provided by a multi-disciplined team of engineers who performed on-site structural and architectural inspections. Following the documentation, the team developed construction drawings and technical specifications portraying the recommended structural, mechanical, process and electrical repairs and/or rehabilitation for the structures. Putnam WTP Retention Basin Rehabilitation, Greenwich: In 2019, Weston & Sampson was selected to develop an alternative analysis report to determine the best way to rehabilitate or replace the existing soldier pile wall along the east side of the retention basin. Based on the alternative analysis report, we prepared modular wall construction documents for the rehabilitation. Provided construction services for the project as well including review of all submittal, payment applications and full-time on-site construction inspections. WTP Treatment Tank Inspections and Rehabilitation, Easton: In 2019, Weston & Sampson was selected to develop plans to address various capital improvements to the existing Easton Water Treatment Plant (WTP). The improvements included various structural repairs and upgrades at the contact tank effluent vault, flocculation and settling basins, operation building, electrical vaults, venturi chamber, sludge room, and site walkways. The project required both analysis of existing structures in the areas noted and design of new framing structures. Our team provided structural construction services which included the review of submittals and shop drawings, payment applications and full-time on-site construction inspection.
Page 633
westonandsampson.com PROJECT SHEETS\Water\Comprehensive\CT_CT Water OnCall Engineering Services On-Call Engineering Services connecticut water company | connecticut Weston & Sampson has assisted the Heritage Village water and wastewater utility providers since 1999, through its earlier owner (Heritage Village Water Company) and its current owner, Connecticut Water Service, Inc. Our team has been providing subsidiary, Connecticut Water Company, with full service multi-discipline consulting engineering services related to water supply and distribution system improvements throughout the state, including water mains, water booster stations, water storage tanks, chemical treatment systems, and water supply planning and permitting. Representative Projects – Past 10 Years: • 2016 HV WWTP Easement Mapping • 2016 HV WWTP PS Easement Mapping – Poverty Road PS • 2018 Heritage Village Lift Station #1 Replacement • 2019 HV WWTP Clarifier Walkway Design • 2019 HV WWTP Operations Assistance – Owner’s Project Manager • 2019 HV WWTP Clarifier Rake Assembly Repair • 2020 Heritage Village Lift Stations 7 & 8 Pump Replacements • 2020 Heritage Village Lift Stations 7 & 8 Pump Base Replacements • 2020 HV WWTP Operations Assistance Services • 2020 HV WWTP Clarifier Walkway Installation • 2020 HV WWTP Aeration System DO Meter System Design / Install • 2020 Heritage Village Lift Stations 7 & 8 Bypass Connection Install • 2020 Heritage Village Hillhouse Road Sewer Realignment Evaluation/Design • 2022 Heritage Village Manhole Rehabilitation Project • 2023 Lift Stations 2, 3 & 4 consolidation Project • 2024 Emergency Sewer Repair • 2025 Heritage Village WWTP Upgrade: UV Conversion • Southbury Church Road Booster PS Client Contact Dave Peeling Vice President of Engineering 860 664-6007 dpeeling@CTWater.com Don Schumacher Superintendent of Operations 860 664-6067 DSchumacher@CTWater.com Start Date: 1999 End Date: Ongoing Cost: varies (multiple projects)
Page 634
westonandsampson.com Water Distribution System, Thompson, Connecticut: Weston & Sampson provided design services to support the installation of a replacement 12-inch diameter water main at the underside of the Main Street Bridge over the French River. We provided construction documents for the installation of the proposed water main and attachment of pipe supports to the existing framing of Bridge No. 04458. The existing 8-inch water main crossed under the French River to the north of the existing town-owned bridge. Project goals included replacing the existing water main with a new 12-inch diameter ductile iron pre-insulated water main. The design consisted of spanning the river, underneath the bridge deck, between existing structural steel members, along the northern side of the bridge. The water main penetrated the existing abutments and connected to water main on either side of the bridge. Our team performed Load Rating Analysis of the existing bridge superstructure to carry the anticipated new insulated 12-inch water main, water main support system and appurtenances for the water main. The analysis was reviewed and approved by Connecticut Department of Transportation (CTDOT). Church Road Water Booster Pump Station, Southbury, Connecticut: Weston & Sampson provided design and bid phase services for a replacement water booster station on Church Road. The station was designed for a pumping capacity not less than 1,500 GPM using three equally sized pumps. One pump handles average flows, the second pump handles peak flows, and the third pump provides redundancy. Internal piping included a bypass and PRV with pressure relief to feed bi-directionally through the station. We provided geotechnical engineering, site/civil, permitting, architectural, structural, electrical and HVAC design support. The project also included performing a hazardous building materials survey to support the demolition of the existing 1970s era pumping station.
Page 635
westonandsampson.com PROJECT SHEETS\Transportation\Road\CT_Branford Main Street Reconstruction Project Highlights • roadway & drainage designs • complete streets • utility improvements • stormwater management & LID • safety improvements • public engagement plan • state grant funding Main Street Reconstruction branford, connecticut The Town of Branford selected Weston & Sampson to design the reconstruction of 2,000 feet of Main Street, an urban collector downtown roadway that is a main corridor with commercial activity. The Main Street area is located within a five-minute walk of the transit-oriented development (TOD) district; it also abuts Town Hall and a community park, and encompasses an historic town green and trolley route. Our design efforts considered multi-modal transportation, including buses, cars, bicycles, and pedestrians, and involved repurposing the remnant trolley tracks into the landscape. Our team designed improvements to roadways and intersections that would increase safety, accessibility, and mobility while incorporating Complete Streets methodologies and traffic calming measures. Our work included examining ways to enhance traffic and pedestrian circulation and parking interconnectivity, with improved side street and off-street parking options. Project improvements will provide for better traffic flow, safer pedestrian zones (i.e., sidewalks and crosswalks), drainage improvements, low impact development (LID), and an aesthetically enhanced streetscape. As the project progressed, the scope of our efforts morphed into a full-scale downtown revitalization project. Our team provided wholesale improvements that included placemaking, ADA accessibility enhancements, green infrastructure, street tree plantings, pedestrian lighting and furnishings, paver sidewalks, and granite curbing to fit within the context of a lively mixed-use environment downtown area serving as the heart of the Branford community. Our efforts also involved developing a public engagement plan that included public and stakeholder meetings, virtual engagement, a virtual survey, social media, and website postings. Final designs include three different Tree Filter designs, raingardens, and tree plantings to manage stormwater, improve the urban tree canopy, and lower the urban heat index. In addition to our initial designs, Weston & Sampson will provide design services during construction and construction engineering and inspection (CE&I) services. This reconstruction and revitalization project also received funding through CTDOT’s Local Transportation Capital Improvement Program (LOTCIP). Client Contact John Hoefferle Town Engineer 203-315-0606 engineering@branford-ct.gov
Page 636
westonandsampson.com
Page 637
westonandsampson.com PROJECT SHEETS\Landscape Architecture\Playgrounds and Recreation\CT_Bristol Page Park Renovation Project Highlights • lighted post-tension concrete pickleball, tennis, & basketball courts • lighted synthetic turf baseball/multi-purpose overlay field • range of recreational amenities & improvements • utility & parking improvements Page Park bristol, connecticut Weston & Sampson provided large-scale planning, design, engineering, and permitting services for the renovation of Page Park. The existing 80-acre park includes a network of vehicular, pedestrian, and bicycle circulation paths; parking; water courses; a pond supported by a dam; a disc course; sledding hills; a pavilion; a pool and bath house; racquet and basketball courts; and an active recreation diamond and rectangular fields. Weston & Sampson guided the city through a $15M list of desired improvements towards a creative, realistic, and sustainable solution that is phased in a logical, fiscally responsible manner. Recognizing the significance of this project to the city, Weston & Sampson facilitated the preliminary design process and sought ways to improve the interstitial relationship between the proposed site features. We finessed the design to reduce “leftover” areas of grass that are unusable and difficult to maintain. By reconfiguring this area, we were able to preserve the park’s beloved sledding hill. Weston & Sampson provided geotechnical, stormwater, and utility infrastructure engineering services to determine the best use and appropriate construction methods for the lighted post-tension concrete pickleball, tennis, and basketball courts. Project objectives included achieving: • Renovation of and updates to existing amenities and facilities, including four lighted post-tension concrete pickleball courts, a lighted synthetic turf baseball/multi-purpose overlay field and appurtenances, Ingraham Softball Field and appurtenances, a sledding hill, two picnic shelters, and an outdoor fitness station • Enhanced walkability within the park • Enhanced parking availability at the turf field, playground, courts area, pool, pavilion, disc golf area, and Ingraham Softball Field • Installation of sewer connection and parking necessary for improvements at the Page Park Pavilion Client Contact Joshua Medeiros, EdD, CPRE Superintendent of Parks, Recreation, Youth & Community Services 860-693-5808 / 860-584-6160 joshmedeiros@bristolct.gov
Page 638
westonandsampson.com
Page 639
westonandsampson.com PROJECT SHEETS\Landscape Architecture\Playgrounds and Recreation\MA_BPRD Dorchester Harambee Project Highlights • master plan & multi- phased park design / construction • public participation / community outreach • accessible playgrounds • athletic field & park infrastructure improvements • circulation & lighting analysis & improvements • active & passive recreational amenities • trees additions & landscape enhancements Harambee Park bprd | dorchester, massachusetts Weston & Sampson’s efforts at Harambee Park, one of Boston Parks and Recreation Department’s largest open space assets, includes providing master planning and phased design implementation services. • Phase I included a universally accessible landform play area with a bridge and tower structure, embankment slides, climbing nets, splash pad water features, and swings. Other amenities include two new basketball courts with LED lighting, a workout area, seating, and lighting on pedestrian pathways. • Phase II included two new, multi-use rectangular fields with irrigation and spectator seating, an informal amphitheater and stage area, and an interior walking loop to accommodate multi-generational use. A critical project element involved improving stormwater management due to existing topography and an emergency overflow outfall structure managed by the Boston Water and Sewer Commission. • Phase III included two new football fields with bleachers, a cheerleading practice area, workout nodes, lighted pathways, parking, and stormwater management. • Phase IV involves the design and construction of cricket fields, pathway improvements, 41 new trees, field and path lighting, and other site improvements. Client Contact Cathy Baker-Eclipse Interim Commissioner Boston Parks and Recreation Department 617-961-3058 cathy.baker-eclipse@boston.gov
Page 640
westonandsampson.com
Page 641
westonandsampson.com PROJECT SHEETS\On Call\MA_Framingham On-Call On-Call Engineering Services framingham, massachusetts Weston & Sampson provided on-call engineering assistance to the Framingham Public Works and Engineering Departments for a wide range of infrastructure improvement projects. We provided multi- disciplinary services that encompassed the design, permitting, public information, construction administration, and site inspection phases of project development. Through our on-call services agreement, we have provided the following services: • Town-wide bridge inspections • Bridge / culvert design & construction oversight • Roadway / sidewalk design & construction • ADA enhancements • Utility systems design & construction • Inspection services for DPW designed projects • Streetscape improvements along public corridors • Public hearing presentations & coordination Client Contact William Sedewitz, PE Senior Project Manager Framingham DPW 508-532-6012 wrs@framinghamma.gov
Page 642
westonandsampson.com Our work has required proactive communication and coordination with a variety of public and private entities including the Planning Board, Conservation Commission, Parks and Recreation Department, Housing Authority, Historical Commission, and Framingham State College. Specific projects included: • Full-depth reconstruction of State Street, a scenic by-way that passes through the heart of the Framingham State College campus. • Refurbishment of a major granite block culvert below Maple Street. • Replacement of utility systems below the Pearl Harbor Road housing development off of Concord Street. • Construction of new surface parking areas at the town’s public works complex.
Page 643
References To assist in your evaluation of Weston & Sampson, we offer contact information for some of our current and long-standing clients for whom we have provided similar services. These references can attest to qualifications, work history, and responsiveness. We recognize the importance of providing responsive service and commit our resources to ensure all project goals and deadlines are achieved. We invite you to contact these individuals to discuss our firm’s overall capabilities and past performance. John Gawlak, CPRP Town of Cheshire, CT Director Parks & Recreation 475-343-2832 (mobile) 203-272-2743 (office) jgawlak@cheshirect.org Project: Bartlem Park Weston & Sampson developed a master plan for a 10-acre addition to Bartlem Park, a 65-acre community hub. The master planning effort for the area included an inventory of current assets and an analysis of future needs and implementation strategies. We engaged the community through various methods, including a park planning display at an outdoor event, an online survey, and multiple public meetings with stakeholders. The proposed features for the expanded park include a community pool, splash pad, 90-foot baseball diamond, soccer and lacrosse fields, a nature-based playground, skate park, pavilion, picnic area, community gardens, gathering spaces, parking areas, trail systems, and stormwater management facilities. Joshua Medeiros, EdD, CPRE City of Bristol, CT Superintendent of Parks, Recreation, Youth & Community Services 860-693-5808 / 860-584-6160 joshmedeiros@bristolct.gov Project: Page Park Weston & Sampson provided comprehensive large-scale planning, design, engineering, and permitting services for Page Park, an 80-acre recreational facility. The existing park featured diverse amenities, including vehicular, pedestrian, and bicycle circulation paths; parking areas; watercourses; a pond with dam; disc course; sledding hills; pavilion; pool and bathhouse; racquet and basketball courts; and active recreation fields. Our firm guided the city through the improvement program, developing a creative, realistic, and sustainable solution. Key improvements included four lighted post-tension concrete pickleball courts, lighted synthetic turf baseball/multi-purpose overlay field, Ingraham Softball Field upgrades, enhanced sledding hill facilities, two picnic shelters, outdoor fitness station, and overall improved walkability and parking. Lynn Sadosky, PE Town of North Haven, CT Director of Public Works 203-672-8363 sadosky.lynn@northhaven-ct.gov Project: Various Athletic Field Improvements Weston & Sampson provided landscape architecture services for athletic field improvements in North Haven, including the development of a $7 million master plan for the North Haven Athletic Complex and the Vanacore Track Replacement at North Haven Middle School. The master plan incorporated baseball and softball field renovations, a new concession building, a new 1,000-seat grandstand at the turf field, and tennis court renovations, with Phase 1 construction documents addressing $3.5 million in improvements. The Vanacore Track Replacement expanded the track from 6 to 8 lanes along the straightaway and included a new track surface, long jump and triple jump lanes and pits, pole vault and high jump areas, fencing, sports field lighting, a scoreboard, and concession and locker room access. The project also required significant grading and drainage improvements to address a 1.5-foot elevation change and bring the facility up to current standards.
Page 644
Project Understanding Weston & Sampson is excited for this opportunity to provide our qualifications for professional design and engineering services for the Town of Granby as they plan several improvement projects over the next five years, including but not limited to the following: • Planning, design and construction of a replacement running track and adjacent baseball and softball fields at the high school and middle school complex • The construction of a year-round bathroom at Salmon Brook Park • The construction of pickleball courts at Salmon Brook Park • The assessment and administration of a sewer pump maintenance project • Other engineering tasks associated with capital infrastructure Weston & Sampson’s comprehensive team has been specifically assembled for these initiatives and includes designers, engineers, and technical experts with the in-house resources needed to support your projects. We are ready to bring our experience to develop solutions that are thoughtfully designed, practical, durable, and cost-effective to meet your needs.
Page 645
Granby, CT | Professional Engineering Services Track & Diamond Field Project Approach The RFP outlines the planning, design, and construction of a replacement athletic/running track and adjacent baseball and softball fields at the high school/middle school complex. Our team has consciously chosen to focus their careers on the design of outstanding athletic facilities, municipal parks, and open space projects, bringing a great depth of knowledge and experience garnered from working within the public realm to every assignment. We recognize that this project is extremely important to the Town of Granby, and we are dedicated to bringing our energy, creativity, and technical prowess to all aspects of this project when developing your athletic facility complex. Having successfully managed and completed many large-scale projects of similar nature, we believe our technical skills and past experiences will allow us to exceed the specific needs of the district effectively and efficiently. Weston & Sampson has become a trusted partner for several communities in the implementation of projects because of our reputation for knowing how to get big ideas permitted and built. We have developed a simple formula that allows us to develop strong partnerships with our clients that ultimately yield strong project results. To this end, we pledge to: • be highly responsive, accountable, and communicative • listen well, facilitate, and then execute at an extremely high level Based on the information included in your RFP and our understanding of the project, Weston & Sampson has outlined the following approach that we anticipate for the track and diamond field project. Scope of Services The approach is divided into eight basic tasks as described below: • Task 1 – Project Scope Definition & Contract Agreement • Task 2 - Site Investigation • Task 3 – Preliminary Design • Task 4 – Design Development • Task 5 – Local / State Permitting • Task 6 – 100% Design & Contract Documents • Task 7 – Bid Assistance • Task 8 – Construction Administration
Page 646
Granby, CT | Professional Engineering Services Task 1 | Project Scope Definition & Contract Upon selection, Weston & Sampson project managers shall meet with key town staff members to determine and define project scope, goals, schedule, and budgets to inform the development of a project task order. The town will share any existing information or mapping with the Weston & Sampson team for their review and use in developing the project task order and fee to complete design, permitting, bidding and construction services. Upon agreement, the project team will commence Tasks 2 – 8. Task 2 | Site Investigation Project Kick-off Meeting At the outset of the project, Weston & Sampson will facilitate a kick-off meeting with key stakeholders, including town officials, Board of Education representatives, facility staff, athletic department representatives, emergency services, and other parties identified by the town. This meeting will serve to confirm the project’s objectives, target budget, critical schedule milestones, scope, expectations, existing conditions, and construction phasing and duration goals. We will also conduct a site visit to photo-document current conditions and verify key elements identified in the site survey. Conducting site investigations at the early onset of this project is critical to the advancement of the design and permitting process. The site investigations will include: Wetlands Flagging Inland Wetlands & Watercourses will be flagged and delineated by our subconsultant Davison Environmental, LLC. Weston & Sampson will coordinate the flagging process with the surveyors and manage the submission of local regulatory site plan applications. Additionally, a soil report will be prepared for use during the regulatory review process. Topographic Survey If a recent topographic survey is not available, our subconsultant licensed surveyor, Denno Land Surveying, will perform a topographic survey to include areas related to the desired improvement program, anticipated project areas, and associated wetlands. Subsurface Investigations Weston & Sampson will provide subsurface investigations and analysis to understand water recharge characteristics related to stormwater design, the need for amending existing soils to establish quality turfgrass, and soil bearing capacities to support the proposed improvement plan. Geotechnical Engineering & Subsurface Exploration Based on the preliminary design plans, Weston & Sampson will prepare a subsurface exploration plan. Geotechnical borings and test pits will be completed to better understand the underlying conditions as they relate to construction of the proposed improvements. We will coordinate and commission a drilling contractor to conduct the borings. The drilling contractor will be responsible for contacting Call-Before-You-Dig (CBYD) prior to conducting fieldwork. It is estimated that up to two days of borings will be necessary. Based on the results of the field work, Weston & Sampson will prepare a geotechnical report and make recommendations regarding pavement design, excavation and earthwork, sports lighting footings, and other identified project improvements.
Page 647
Granby, CT | Professional Engineering Services Natural Turf Rootzone Design Testing and observations will inform the sports field design. If natural fields are desired, Weston & Sampson will visit the site and perform testing to determine the physical, nutrient, and drainage components of the athletic field areas. Stormwater Subsurface Investigation & Test Pits Test pit observation (at approximately 48”-60” inches below the surface) and percolation tests will be completed. Deeper test pits may be required for synthetic turf field and stormwater management areas and will depend on design documents. Test pits provide essential information for site investigations, enabling engineers and geologists to gain a comprehensive understanding and direct visual examination of subsurface soil and rock conditions, groundwater levels, and potential obstructions, used to inform foundation/ footing designs and stormwater management systems. Private Utility Locator Weston & Sampson will field locate boring and test pit locations and commission a private utility locator to mark out subsurface utilities in the vicinity of the test pit and boring locations. Hazardous Materials Assessment If a hazardous materials assessment is needed, Weston & Sampson will provide a scope and fee to develop a remedial action plan and specifications. Task 3 | Preliminary Design (25%) During the preliminary design phase, Weston & Sampson will develop a site plan and validate the program cost early in the process. Site plan concepts will be created, illustrating the identified program elements and their connections throughout the site, all within the targeted budget range. Based on feedback from the town, the design team will refine one preferred site plan. Once the town confirms the preferred site plan, Weston & Sampson will engage a third-party cost estimator to prepare a preliminary design
Page 648
Granby, CT | Professional Engineering Services opinion of probable cost. These estimators provide real-time construction cost data, which is essential in today’s fluctuating market. Design team attendance at town commission meetings will be defined in the project contract. At the conclusion of the preliminary design phase, the budget will be confirmed, and the scope and design of all improvements will be finalized. Preparation of design development documents, and permitting materials, will begin upon written authorization from the town. Task 4 | Design Development (75%) Upon written authorization approving the preferred preliminary design concept and budget from the town, the team will advance preliminary design drawings to the design development level. The team will advance the site plans toward a 75% Design Development set that is suitable for submission to regulatory agencies. Documents will include plans, details, outline specifications, and an opinion of probable construction costs. During the design development phase, the team will coordinate with vendors to confirm a palette of site materials and features. This advanced drawing set will consist of plans that outline material, layout, grading, drainage, utilities, sedimentation and erosion control, and typical details. Task 5 | Local / State Permitting Weston & Sampson will use the 75% Design Development documents for local and state permitting. Local and state permitting needs shall be assessed during project scope definition, but the Weston & Sampson team anticipates the following permits will be required: Local: • Inland Wetlands Permit (Inland Wetlands & Watercourses Commission) (IWWC) • Planning and Zoning Approvals (Planning & Zoning Commission)
Page 649
Granby, CT | Professional Engineering Services State: • Connecticut Department of Energy and Environmental Protection (CT DEEP) Natural Diversity Data Base (NDDB) • CT DEEP General Permit for the Discharge of Stormwater from Construction Activities Task 6 | 100% Design & Contract Documents Upon receipt of regulatory approvals, the team will advance plans, details and specifications from the 75% Design Development set to 90% Construction Documents, and through 100% final design and contract documents. The third- party cost estimator will update their opinion of probable cost to respond to the provided 100% construction documents. Task 7 | Bid Assistance Weston & Sampson will be available to attend a pre-bid conference and to answer the inquiries of prospective bidders during the bid period. We will furnish the information needed to issue any required addenda. Upon receipt of bids, Weston & Sampson will review bids for general conformance to the bid requirements. We will coordinate with town representatives and make a recommendation for the award and attend a bid scope meeting. Task 8 | Construction Administration Weston & Sampson’s construction phase services include the following tasks: • Attendance at a pre-construction meeting • Attend a weekly site visit and provide an updated site report • Attendance at weekly construction meetings and the generation of meeting minutes. • RFI responses and clarifications • Monthly Pay Application review • Submittal review and responses • Initial Punch List • Project closeout
Page 650
Granby, CT | Professional Engineering Services On-Call Engineering Services We understand the purpose of engaging an on- call consultant is to supplement the Town of Granby with flexible, cost-effective, responsive solutions and reliable manpower that can support the town’s in-house staff capabilities when needed. Further, on-call engineering services make specialized and technical expertise immediately available when necessary to satisfy project requirements that cannot be directly addressed by town staff. Such needs might include geotechnical engineering; discovery of environmental contamination; or specialized construction, maintenance, or repair requirements, as examples. The appointment of a firm that can provide a wide range of design, engineering and planning services, as well as construction, maintenance, repair, and licensed plant operations services, would be of the best and highest benefit to the Town of Granby. Weston & Sampson understands the technical and administrative complexities of working within an on-call environment. Assignments can come at any time, and the type of work can vary widely. On-Call Contract Experience Our specifically selected team is accustomed to performing on-call assignments with existing clients. As an experienced project manager, Ryan Chmielewski, RLA, ASBA, will effectively engage with supporting Weston & Sampson staff to respond quickly and efficiently. Our staff is frequently cross trained in different but interrelated disciplines. The multidisciplinary experience allows our managers the flexibility to match required staff experience, training, and
Page 651
Granby, CT | Professional Engineering Services availability with your needs and the schedule of the assignments at hand. Many of our team possess multiple state licenses to practice in their given fields and specialties, and many possess advanced degrees, certifications, and licenses. Our team has the required professional backgrounds, experience, and qualifications necessary to successfully complete work assignments across the full range of disciplines and services indicated in the town’s RFP. Weston & Sampson understands the need and the sense of urgency that come with on-call assignments, having provided similar services to many Connecticut municipalities spanning decades. As a result, this level of attentiveness is instilled in every member of our staff assigned to your projects, and we strive for total client satisfaction. Your town staff is an integral part of any project team that is formed, and our staff is an extension of that team. As such, we will maintain close coordination and cooperation with the town’s administrative and operations staff throughout any on-call appointment. On-Call Scopes of Work The general scope of services to be provided is described in the town’s RFP and establishes the town’s basic expectations. The scope may be expanded and/or refined during the initiation and negotiation process as each assignment dictates. Weston & Sampson will provide services as detailed in written Task Orders and Amendment Letters that follow established industry standards. When we are given an assignment, we will be certain to fully understand the scope of the project, and we will identify issues and define the various elements required. Weston & Sampson’s ability to provide a wide range of required services quickly and successfully, including emergency and unanticipated assignments, is demonstrated through our collective on-call and individual project experience, which is documented throughout our submittal. Management Approach Our approach to any assignment is to tailor the scope and budget to meet the client’s specific project goals and needs—assignments issued under this on-call would be no exception. Weston & Sampson’s management approach to all projects is to work closely with our clients to develop the most feasible and cost-effective solutions to our projects. We focus on keeping projects on schedule and within budget, and we will ensure the Town of Granby is involved in the decision-making process. This avoids unnecessary surprises at a later date, which could result in delays, schedule extension, and cost increase. The experience of Weston & Sampson’s Connecticut Regional Manager and principal- in-charge for this on-call, Raju Vasamsetti, PE, and the chosen project team members demonstrate our company’s breadth of capabilities and our ability to effectively manage and execute a variety of project types. Ryan Chmielewski, RLA, ASBA, team leader/project manager, will support Raju to ensure your projects are staffed with key team members to facilitate technical expertise for the scope. Regardless of the size or scope, upon notification of a potential assignment from the
Page 652
Granby, CT | Professional Engineering Services town, our project manager will meet with town staff to review the assignment and determine the most appropriate approach, including schedule, budget, and other constraints. At this meeting, we will listen carefully and seek to fully understand each stated concern, desire, and preference regarding the assignment, so our scope can be tailored to meet the town’s expectations without surprises. Ryan will identify the most appropriate project team and collaborate to establish clear lines of responsibility and communication with both the Town of Granby and within the Weston & Sampson team to facilitate a project that meets schedule and budget. Subconsultant Involvement When an assignment requires specialized expertise not available directly from Weston & Sampson, subconsultants will be invited to participate, recognizing that all invitations are subject to the town’s prior consideration and approval. We understand the importance of working with reliable subconsultants who have consistently demonstrated the ability to respond quickly, efficiently, and cooperatively for your needs. Should a task be assigned a specific percentage goal, Weston & Sampson is fully prepared to enlist the services of minority and women-owned business enterprises (M/WBE). Partnering with disadvantaged businesses is a very common practice of Weston & Sampson, and we have very strong and long-established working relationships with many M/WBE firms, upon whom we frequently call to provide specialized services throughout our service area. Project Approach Weston & Sampson will take a similar approach as outlined in the Track & Diamond Field Project, by dividing tasks into eight basic tasks as described below: • Task 1 – Project Scope Definition & Contract Agreement • Task 2 - Site Investigation • Task 3 – Preliminary Design • Task 4 – Design Development • Task 5 – Local / State Permitting • Task 6 – 100% Design & Contract Documents • Task 7 – Bid Assistance • Task 8 – Construction Administration Supplemental Services Beyond our core design and engineering services, Weston & Sampson offers the following supplemental services to support the Town of Granby: • Public engagement & surveys • Construction inspections • Operations, assessment, and maintenance services What sets Weston & Sampson apart from other multidisciplinary offices is our core values that push staff toward continual growth and interdepartmental collaboration. Shared experiences help develop innovative design solutions that are tailored to each project and embrace the project vision.
Page 653
Services Expected by the Town Careful planning is the cornerstone to efficient project management. To that end, we will notify the town in anticipation of any information and resources that may be necessary in order to development clear scopes of work and defined project goals. Below, we list the resources, personnel, data, or other assistance Weston & Sampson typically requests to complete tasks in a timely manner, depending on the type of assignment. We will define any additional requirements depending on the tasks that arise out of this contact. • A point-of-contact at the town • Base Geographic Information System (GIS) mapping and other survey information that may be beneficial to the assignment’s development and completion • Utility information and property data as necessary • Access for non-town-owned parcels • Access to site and buildings and personnel familiar with the uses of the areas • Beneficial knowledge of site conditions, as available • Historical design plans (record or “As-Built”) and specifications for existing facilities • Boring logs or other subsurface information • Operational history of existing facilities • Available engineering data and existing studies / evaluations from sites or areas of interest • A machine and operator, water, and contacting Call-Before-You-Dig before excavation of test pits. • Pay associated fees for non-local permitting • Test pit operator, equipment, and site repair Project Highlight: Wayland High Athletic Fields & Stadium Renovations, Wayland, MA
Page 654
Page 7 of 7 APPENDIX A Cost Proposal Name of Engineering Firm: __:HVWRQ 6DPSVRQ(QJLQHHUV,QF_________________________ Services Needed On-Call Engineering and Related Services Please indicate your firm’s hourly fees over the five-year period of the contract Billing Category Hourly Billing Rate Project Manager ________________ Chief Engineer ________________ Engineer ________________ Technician Support ________________ Clerical/Researcher ________________ Other ________________ Other Expenses (if applicable): Identify any other categories and costs required to provide Engineering and On-Call services that are not included above: ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ 3OHDVHVHHWKHIROORZLQJDWWDFKPHQWIRURXUKRXUO\IHHVRYHUWKHILYH\HDUSHULRG DVZHOODVDGGLWLRQDOFRVWLQIRUPDWLRQ
Page 655
Proposed Fee Schedule Hourly Rates Weston & Sampson is committed to providing maximum value on all our projects, and we are pleased to provide our Hourly Rate Schedule for on-call engineering services. Weston & Sampson is well positioned to provide the required services for the Town of Granby, and we are confident that the experience of our project team will ensure expert, timely, cost- effective services for your project. Other Necessary Costs These rates shall be valid through the first year of contract services and are subject to annual adjustment through negotiations and contract revision to include rate increases that average 4% annually. For assignments that require fees to be billed on an hourly rate basis, we anticipate computing and billing direct expenses and any subconsultant costs using a 5% markup. Travel mileage costs will be billed at the current Federal Mileage Rate in effect at the time services are rendered, presently $0.725 per mile. Hourly Rate Schedule Labor Category Year 1 Year 2 Year 3 Year 4 Year 5 Principal In Charge $355 $369 $384 $399 $415 Discipline Leader $325 $338 $352 $366 $381 Director of Design $315 $328 $341 $354 $369 Senior Technical Leader / Senior Team Leader $265 $276 $287 $298 $310 Team Leader/ Senior Project Manager $290 $302 $314 $326 $339 Licensed Environmental Professional $260 $270 $281 $292 $304 Senior Project Manager $235 $244 $254 $264 $275 Project Manager II $220 $229 $238 $247 $257 Project Manager I $205 $213 $222 $231 $240 Senior Engineer / Designer / Planner $185 $192 $200 $208 $216 Project Engineer / Designer / Planner $170 $177 $184 $191 $199 Engineer / Designer / Planner III $155 $161 $168 $174 $181 Engineer / Designer / Planner II $138 $144 $149 $155 $161 Engineer / Designer / Planner I $125 $130 $135 $141 $146 Environmental Scientist I $110 $114 $119 $124 $129 Draftsperson / Technician $105 $109 $114 $118 $123 Clerical / Researcher $130 $135 $141 $146 $152 Resident Engineer (PE and/or NICET IV) $210 $218 $227 $236 $246 Senior Inspector (NICET IV) / Construction Manager $180 $187 $195 $202 $211 Inspector (NICET III) $155 $161 $168 $174 $181 Resident Representative (NICET II) $145 $151 $157 $163 $170
Page 656
Response to Evaluation Criteria Weston & Sampson has reviewed the Evaluation Criteria outlined in your RFP, and we have taken care to address these items throughout our submittal, thereby demonstrating our understanding of and ability to complete your project. We are confident that the Town of Granby will find Weston & Sampson compliant and fully responsive to the RFP requirements and that our submission successfully reinforces the depth and breadth of our credentials. In the graphic below, we have identified where in our response we address each of the evaluation criteria.
Page 657
westonandsampson.com 712 Brook Street | Rocky Hill, CT 06067 PROPOSAL | July 2026
Page 658
Page 659
Page 660
Page 661
Page 662
Page 663
Page 664
Page 665
Page 666
Page 667
Page 668
Page 669
Page 670
Page 671
Page 672
Page 673
Page 674
Page 675
Page 676
Page 677
Page 678
Page 679
Page 680
Page 681
Page 682
Page 683
Page 684
Page 685
Page 686
Page 687
Page 688
Page 689
TOWN OF GRANBY MEMORANDUM DATE: July 28, 2026 TO: Mike Walsh, Town Manager FROM: Mark Neumann, Public Building and Capital Project Committee REGARDING: Milestone Events for the Bond Questions At the July meeting of the Public Building and Capital Project Committee, I committed to the fellow committee members to write a set of milestones for each of the Bond questions for use in discussion at the August meeting. My thoughts are summarized in the table below: Question Library Expansion Middle School Repair and Design Track and Field Repair and Replace Park Pickleball and All season Bathroom Sewer Pump Maintenance Number 1 2 3 4 5 Issue Engineering RFP 19-Jun 19-Jun 19-Jun 19-Jun 19-Jun Receive Engineering RFP responses 24-Jul 24-Jul 24-Jul 24-Jul 24-Jul BOS Bond Questions approval 3-Aug 3-Aug 3-Aug 3-Aug 3-Aug August meeting of the PBCPC 12-Aug 12-Aug 12-Aug 12-Aug 12-Aug Draft the Question Guide for Voter 3-Sep 3-Sep Interview Engineering firms 7-Sep 7-Sep 7-Sep 8-Sep 8-Sep September meeting of the PBCPC 9-Sep 9-Sep 9-Sep 9-Sep 9-Sep Select Engineer 15-Sep 15-Sep 15-Sep 15-Sep 15-Sep
Page 690
Draft the Question Guide for Voter 24-Sep 24-Sep 24-Sep BOF Bond Question approval 28-Sep 28-Sep 28-Sep 28-Sep 28-Sep Finalize the Question Guide for Voter 29-Sep 29-Sep 29-Sep 29-Sep 29-Sep October meeting of the PBCPC 14-Oct 14-Oct 14-Oct 14-Oct 14-Oct November 3rd State and Federal election 3-Nov 3-Nov 3-Nov 3-Nov 3-Nov November meeting of the PBCPC 11-Nov 11-Nov 11-Nov 11-Nov 11-Nov Hold Open House 12-Nov 12-Nov 12-Nov 12-Nov 12-Nov Town Meeting 1-Dec 1-Dec 1-Dec 1-Dec 1-Dec Town Referendum 8-Dec 8-Dec 8-Dec 8-Dec 8-Dec
Page 691
TOWN OF GRANBY MEMORANDUM DATE: July 15, 2026 TO: The Granby Board of Selectmen FROM: Betsy Mazzotta REGARDING: Draft Template for Bond/Capital Project Descriptions Attached for your review is a draft template for the capital project descriptions which will be used to provide information on the proposed capital projects in a clear and consistent format. The materials will be used to improve transparency and communication with residents by explaining the purpose, need and benefit of each project. Each report will include the following elements: 1. A detailed written description of the project. 2. Any available drawings or exhibits depicting the project such as a site plan, floor plan, schematics, etc. 3. Cost estimate for the project and how it was developed. Additionally, a brief background on the 10-year Capital Improvement Plan, the role of the Capital Program Priorities Advisory Committee (CPPAC), the role of the Public Building and Capital Project Committee (PBCPC) and a timeline for the process were also included. The attached example has been prepared for the proposed Pickleball Courts at Salmon Brook Park to illustrate how the template will be used. Once the board approves the template, a project description will be prepared for each of the proposed projects and printed copies will be available for distribution. The information will also be posted on the Town website on a dedicated page accessible from the homepage, with links to each project. A draft of the proposed website post is also attached for your review. Please review the attached documents and provide any comments or suggested revisions.
Page 692
TOWN OF GRANBY PROPOSED CAPITAL PROJECTS 2026 __________________________________________________________________ Project: Pickleball Courts at Salmon Brook Park Background The Town of Granby, in compliance with the Town Charter, compiles a 10-year Capital Improvement Plan for projects over $250,000 which is used as a working document to support the annual budget and track the projects. The Capital Program Priorities Advisory Committee was convened in October of 2025 to develop criteria to prioritize the capital improvement projects, consider and review the projects and make a recommendation on which projects to move forward to the Board of Selectmen for consideration. CPPAC ultimately recommended a General Fund FY2026 Capital Funding Package totaling $19,450,000 which includes improvements to the high school athletic fields, GMMS repairs and design and a renovation to the Granby Public Library. An additional $2,000,000 was also approved for maintenance of the Town sewer pumps and the installation of pickleball courts and year-round bathrooms at Salmon Brook Park, which will be funded through the Sewer Utility Fund and the Parks & Recreation Fund, respectively. Project Description The Town of Granby provides pickleball courts for use by residents on the existing tennis courts at Salmon Brook Park. Due to complaints by several residents neighboring the park, noise reducing barriers were installed in the Spring of 2026. However, the permanent solution is to relocate the courts to an area in the park which is at least 300 feet from residential housing. The addition of stand-alone pickleball courts at Salmon Brook Park is strongly supported by residents, recommended by the Parks & Recreation Board and supported by the GZA Parks Master Plan. The preliminary plan and location of the courts is outlined in the attached summary report from GZA. A conceptual drawing of the courts is also attached. Preliminary Cost Estimate: $250,000 The construction of a single pickleball court with lights is approximately $80,000. With efficiencies secured through scale and mobilization, it is estimated four courts can be completed with an allocation of $250,000. It is important to note that the project has not
Page 693
been scoped, sized, priced or bid, and $250,000 is the Town’s best estimate of the cost to complete the project. The Town does not prefund costs for engineers or architects to design or scope a project before it is funded. Project work begins, including developing and issuing a request for proposals when funding is put into place. Funding The Town accounts for the revenue and expenses associated with running the parks system through the Parks & Recreation special revenue fund with the cost of operating the system borne primarily by the users of the system through user and rental fees. The Parks & Recreation Fund had a balance of $432k as of June 30, 2025, and by design would pay for the pickleball courts and support the debt service, should bonds be issued. Since the balance was created from user and rental fees, any outflow to support this project is appropriate. The recommendation from the Board of Selectmen and Board of Finance is to issue 20- year bonds in the amount of $250,000 to fund the project. Public Building and Capital Project Committee Once a capital project is approved by the voters, the Public Building and Capital Project Committee is charged with overseeing its planning, design, bidding, construction, budget and progress through completion. The PBCPC is a nine-member committee chaired by Selectman Mark Neumann and meets on the second Wednesday of each month at 6:00 p.m. at the Senior Center. Residents are encouraged and welcome to attend the meetings. Timeline Description Date The Board of Selectmen officially receives the proceedings on the bond questions, allowing the public to review and comment. The Board of Selectmen make any final edits and approve the resolutions Board of Finance approves the resolutions Open House 6 p.m. Senior Center Community Room Town Meeting 7:00 p.m., Town Hall Meeting Room 12/1/26 Town Referendum 8:00 a.m. – 8:00 p.m. Town Hall Meeting Room 12/8/26
Page 694
Page 695
PROPOSED CAPITAL PROJECTS The Town of Granby is proposing to bond five capital projects in 2027. Use the links below to get a detailed description of each project, any available exhibits and cost estimates. High School Athletic Fields Middle School Repairs & Design Granby Public Library Renovation Sewer Pumps Maintenance SBP Pickleball Courts & Bathroom
Minutes: archived copy, SHA-256 fbc39fe2c5a8…. Agenda: archived copy, SHA-256 340d97f8e640…. Packet: kept offline, SHA-256 83dec96e1e1c….