CT Public Docs Tracker

Towns / Granby / Planning & Zoning Commission / Apr 14, 2026

Planning & Zoning Commission, Apr 14, 2026

Granby minutes posted

Documents

TypeDocumentPagesOpen
minutes PZC Minutes 3 PDF download · town site
agenda PZC Agenda 1 PDF download · town site
packet PZC Meeting Packet 69 PDF download · town site

Summary of the minutes

AI-generated summary. Each line links to the PDF page it came from; check it before relying on it.

Read the official minutes (PDF, 3 pages) The PDF is the record; this summary is a guide to it.

The Commission approved the March 10, 2026 minutes with one abstention and discussed draft zoning changes for middle housing and mixed-use in commercial zones, with staff to prepare a revised draft. On 280 Salmon Brook Street, the Commission sought Town Attorney advice on bond status and whether a temporary or conditional Certificate of Occupancy could be issued, while an informal discussion on converting the 551 Salmon Brook Street motel to residential use was held with no action.

Decisions (2) · all reported votes

  1. Action on the minutes of March 10, 2026
    Motion by E. Lukingbeal, seconded by R. Lavitt, to approve the March 10, 2026 minutes as presented. C. Chinni abstained.
    Vote: 6-0-1 · p. 1
  2. Adjournment
    Motion by E. Lukingbeal, seconded by C. Chinni, to adjourn the meeting at 8:55 p.m.
    Vote: 7-0-0 · p. 3

Also discussed (4)

  • Proposed zoning regulation changes for Transit Community Middle Housing Developments (2-9 Residential Units) and Mixed-Use in Commercial Zones: Commission discussed draft amendments line-by-line, including new Section 8.30; staff to consult Town Attorney and prepare a revised draft for the next regular meeting. No vote taken. · p. 1
  • 280 Salmon Brook Street, Station 280: Bond status for outstanding work and Certificate of Occupancy $1,542,988.21 $258,000: Commission consensus for town staff to contact the Town Attorney and make a final decision on a Temporary or Conditional C/O, a new Performance Bond, or a letter from the Surety Company establishing a completion timeline, based on the Town Attorney's recommendation. Staff position that no C/O should be issued until outstanding items are completed. · p. 2
  • 551 Salmon Brook Street, Granby Motel: possible conversion to residential use and associated site improvements: Informal discussion only. Applicant to prepare a zoning text amendment for Commission consideration, as multi-family is not currently allowable in the C2 Zone. No action taken. · p. 2, p. 3
  • POCD Committee Update: C. Chinni reported the second public workshop was held March 12th and the Committee is working on the first draft of the plan. No action taken. · p. 3
Summary of the agenda: PZC Agenda

AI-generated summary.

The Granby Planning & Zoning Commission's April 14, 2026 agenda lists items including action on the March 10, 2026 minutes, a discussion of proposed zoning changes for transit community middle housing and mixed-use in commercial zones, and possible action on bond status and a Certificate of Occupancy for 280 Salmon Brook Street. It also includes an informal discussion about possibly converting the Granby Motel at 551 Salmon Brook Street to residential use.

On the agenda (5)

  1. Action on the minutes of March 10, 2026 · p. 1
  2. Commission Discussion: Proposed zoning regulation changes for Transit Community Middle Housing Developments (2-9 Residential Units) and Mixed-Use in Commercial Zones · p. 1
  3. Discussion about possible action regarding 280 Salmon Brook Street, Station 280: Bond status for outstanding work and Certificate of Occupancy · p. 1
  4. Informal Discussion: 551 Salmon Brook Street, Granby Motel, possible conversion to residential use and associated site improvements · p. 1
  5. Public materials display rules: Passage notes that materials for video monitor display must be emailed by 10 AM on meeting day and that zip drives, memory sticks and other data storage devices will not be accepted; this is a procedural rule, not a decision. · p. 1

Full text of the documents

View the minutes PDF on this page (PZC Minutes) Open the PDF
Text of the minutes (PZC Minutes, 3 pages)

Page 1 · open in PDF

1 
MEETING MINUTES 
Town of Granby 
Planning & Zoning Commission  
Tuesday, April 14, 2026, at 7:00 pm  
 
Present: Eric Lukingbeal, Christine Chinni, Mark Lockwood, Eric Myers, Robert Lavitt, Steve 
Muller, and Brennan Sheahan 
Also Present: Director of Community Development Abigail Kenyon and Land Use Coordinator 
Renee Deltenre  
 
1. Call to Order 
Chair Lockwood called the meeting to order at 7:00 p.m. 
 
2. Pledge of Allegiance 
 
3. Seating of Alternates, if applicable 
 
4. Public Session 
None 
 
5. Action on the minutes of March 10, 2026 
 
ON A MOTION by E. Lukingbeal seconded by R. Lavitt, the Commission voted (6-0-1) to 
approve the March 10, 2026, minutes as presented. C. Chinni abstained. 
 
6. Receive applications and schedule public hearing (if applicable) 
None 
 
7. Commission Discussion: Proposed zoning regulation changes for Transit Community 
Middle Housing Developments (2-9 Residential Units) and Mixed-Use in Commercial Zones 
A. Kenyon provided an overview of Public Act 25-1, which requires the Planning and Zoning 
Commission to amend its zoning regulations to address middle housing. Said housing is 
classified as a residential development with 2 to 9 housing units and a mixed-use development 
with residential and commercial uses. Per the legislation, this is to be allowed by summary 
review in commercial zones. In preparation for tonight’s discussion, staff provided a draft 
regulation based on feedback received by the Commission at the last meeting and sample 
regulations provided by the Town Attorney.  
 
The proposed amendments include updates to definitions, permitted uses versus special permit 
uses allowed within the COCE, CC, C2, ED and T1 Zones, and new Section 8.30, Transit 
Community Middle Housing Development. The Commission discussed Section 8.30 line-by-line, 
addressing criteria for roof design, wall/exterior design, landscaping, parking and lighting. 
Concerns were raised regarding specificity and requirements deemed unnecessary were removed. 
Town staff will consult with the Town Attorney regarding if there can be different requirements 
across different zones, and how Aquifer Protection regulations and the Historic Overlay Zone 
may affect these requirements. In preparation for the next regular meeting, staff will prepare a 
revised draft regulation based on comments received from the Commission and Town Attorney. 
 
  

Page 2 · open in PDF

2 
8. Discussion about possible action regarding 280 Salmon Brook Street, Station 280: Bond 
status for outstanding work and Certificate of Occupancy 
A. Kenyon provided a status update and noted that all five buildings have received a Certificate 
of Occupancy, but the pool/pavilion area remain outstanding. At this time, the property owner is 
requesting the Certificate of Occupancy be issued for these items; however, when the Building 
Official issues this final C/O for the project, he is certifying that the property complies the zoning 
regulations and Commission’s approval. As there are outstanding items to be completed, it is 
staff’s position that a C/O should not be issued until all required items are completed. The 
following items are outstanding at this time: 
a. Final topcoat of pavement. 
b. Line striping after topcoat. 
c. Final landscaping inspection/verification plantings are in accordance with the approved 
plans, including fencing. 
d. Site to be stabilized and all silt fence/E&S measures to be removed. 
e. Final review that all trash/debris has been removed. 
f. Design engineer to issue a Certificate of Compliance which states the infrastructure was 
constructed in accordance with the approved plans. 
g. An as-built of the site utilities, structures, and hard surface to be prepared, approved by the 
Town Engineer, and filed with the Town Clerk. 
 
The current surety bond in the Town file is $1,542,988.21. Thomas Kalista of Burkentine Real 
Estate Group was present to address the outstanding items and receive feedback from the 
Commission. He explained that they are looking to close out the open permits for the pool and 
pavilion so tenants may utilize them this summer. The pool would be open from Memorial Day 
to Labor Day. Bids were received for the final topcoat of pavement, which is estimated to cost 
around $258,000 and wouldn’t be complete until the end of September. A temporary or 
conditional C/O was requested, and conversation ensued among the Commission. Concerns were 
raised regarding the existing surety bond and whether funds would be easily accessible if the 
bond were called to complete the project. Options discussed were the issuance of a Temporary or 
Conditional C/O, a new Performance Bond or receipt of a letter from the Surety Company to 
establish a timeline for completion of outstanding site work. There was a consensus among the 
Commission for town staff to contact the Town Attorney and make a final decision based on their 
recommendation.  
 
9. Informal Discussion: 551 Salmon Brook Street, Granby Motel, possible conversion to 
residential use and associated site improvements 
Attorney Richard Case was present on behalf of his client Freedom Property, LLC, to discuss the 
potential conversion of the property located at 551 Salmon Brook Street to residential use. The 
4.1-acre property is located within the C2 (Business) Zone and is occupied by a 14-room motel 
that is served by a private well and septic system. Freedom Property, LLC is under contract to 
purchase the property and would like to convert the existing structure into an apartment complex. 
The majority of construction would be to the rear, allowing the expansion of the existing 14 
rooms and façade modifications would occur at the front. Each apartment would have private 
access to the outside, and majority of the units would be one-bedroom, with a handful of two-
bedroom available.  
 
Professional Engineer David Whitney has been retained to develop the Site Plans, which includes 
the installation of a new septic system and well, along with the future construction of detached 
garages. Both Attorney Case and his client have been in contact with town staff and will be 

Page 3 · open in PDF

3 
preparing a zoning text amendment for consideration by the Commission, as multi-family is not 
currently an allowable use in the C2 Zone. Attorney Case noted that his client recently finished a 
project in Simsbury where they converted a hotel into market rate apartments, and discussion 
ensued among the Commission regarding the potential conversion of existing buildings within 
the C2 Zone for residential use.  
 
10. POCD Committee Update 
C. Chinni stated that the second public workshop was held on March 12th and the Committee is 
working on the first draft of the plan.  
 
11. Staff Report and Correspondence 
None 
 
12. Commissioner Reports and Correspondence 
M. Lockwood stated for the record that he expressed concerns to the town regarding the recent 
construction that occurred within the Town Hall Meeting Room.  
 
13. Adjourn 
 
ON A MOTION by E. Lukingbeal seconded by C. Chinni, the Commission voted (7-0-0) to 
adjourn the meeting at 8:55 p.m.  
 
Respectfully submitted, 
 
 
 
Renee Deltenre 
 
 
View the agenda PDF on this page (PZC Agenda) Open the PDF
Text of the agenda (PZC Agenda, 1 page)

Page 1 · open in PDF

Please note: Any person who wishes to provide materials for display on the video monitors at a PZC meeting where such 
monitors are being used to videoconference the meetings must email the materials no later than 10 AM on the day of the meeting. 
All materials must be contained in a single attachment to the email.  Materials received after the 10 AM deadline will not be 
accepted for display. Display of the materials is subject to all other rules and procedures of the PZC. Zip drive, memory sticks 
and other data storage devices will not be accepted. 
Town of Granby 
Planning & Zoning Commission  
Regular Meeting Agenda 
Tuesday, April 14, 2026, at 7:00 pm  
Town Hall Meeting Room 
 
Zoom: https://us02web.zoom.us/j/83374886027?pwd=YA5sptlpEuwpe6eyKxubU28plli8Wz.1 
Call-In: 1-929-205-6099 
Meeting ID: 833 7488 6027 
Passcode: 283022 
 
1. Call to Order 
 
2. Pledge of Allegiance 
 
3. Seating of Alternates, if applicable 
 
4. Public Session 
 
5. Action on the minutes of March 10, 2026 
 
6. Receive applications and schedule public hearing (if applicable) 
 
7. Commission Discussion: Proposed zoning regulation changes for Transit Community Middle 
Housing Developments (2-9 Residential Units) and Mixed-Use in Commercial Zones 
 
8. Discussion about possible action regarding 280 Salmon Brook Street, Station 280: Bond 
status for outstanding work and Certificate of Occupancy 
 
9. Informal Discussion: 551 Salmon Brook Street, Granby Motel, possible conversion to 
residential use and associated site improvements 
 
10. POCD Committee Update 
 
11. Staff Report and Correspondence 
 
12. Commissioner Reports and Correspondence 
 
13. Adjourn 
 
View the packet PDF on this page (PZC Meeting Packet) Open the PDF
Text of the packet (PZC Meeting Packet, 69 pages)

Page 1 · open in PDF

Please note: Any person who wishes to provide materials for display on the video monitors at a PZC meeting where such 
monitors are being used to videoconference the meetings must email the materials no later than 10 AM on the day of the meeting. 
All materials must be contained in a single attachment to the email.  Materials received after the 10 AM deadline will not be 
accepted for display. Display of the materials is subject to all other rules and procedures of the PZC. Zip drive, memory sticks 
and other data storage devices will not be accepted. 
Town of Granby 
Planning & Zoning Commission  
Regular Meeting Agenda 
Tuesday, April 14, 2026, at 7:00 pm  
Town Hall Meeting Room 
 
Zoom: https://us02web.zoom.us/j/83374886027?pwd=YA5sptlpEuwpe6eyKxubU28plli8Wz.1 
Call-In: 1-929-205-6099 
Meeting ID: 833 7488 6027 
Passcode: 283022 
 
1. Call to Order 
 
2. Pledge of Allegiance 
 
3. Seating of Alternates, if applicable 
 
4. Public Session 
 
5. Action on the minutes of March 10, 2026 
 
6. Receive applications and schedule public hearing (if applicable) 
 
7. Commission Discussion: Proposed zoning regulation changes for Transit Community Middle 
Housing Developments (2-9 Residential Units) and Mixed-Use in Commercial Zones 
 
8. Discussion about possible action regarding 280 Salmon Brook Street, Station 280: Bond 
status for outstanding work and Certificate of Occupancy 
 
9. Informal Discussion: 551 Salmon Brook Street, Granby Motel, possible conversion to 
residential use and associated site improvements 
 
10. POCD Committee Update 
 
11. Staff Report and Correspondence 
 
12. Commissioner Reports and Correspondence 
 
13. Adjourn 
 

Page 2 · open in PDF

1 
MEETING MINUTES 
Town of Granby 
Planning & Zoning Commission  
Tuesday, March 10, 2026, at 7:00 pm 
 
Present: Eric Lukingbeal, Paula Johnson, Mark Lockwood, Eric Myers, Robert Lavitt, Steve 
Muller, and Brennan Sheahan 
Also Present: Director of Community Development Abigail Kenyon and Land Use Coordinator 
Renee Deltenre  
 
1. Call to Order 
Chair Lockwood called the meeting to order at 7:00 p.m. 
 
2. Pledge of Allegiance 
 
3. Seating of Alternates, if applicable 
P. Johnson was seated for C. Chinni. 
 
4. Public Session 
None 
 
5. Action on the minutes of February 10, 2026 
 
ON A MOTION by R. Lavitt seconded by E. Lukingbeal, the Commission voted (6-0-1) to 
approve the February 10, 2026, minutes as presented. P. Johnson abstained. 
 
6. Public Hearings 
a. Application seeking to modify a Site Plan and Special Permit under Zoning 
Regulations Sections 3.5.4.3 and 8.21.4 for a commercial building in the Aquifer 
Protection Overlay Zone with outdoor storage, for property located at 14 Mill Pond 
Drive, C2 Zone. 
Applicant and property owner Steve Briggs was present to discuss the application. He 
applied for Site Plan and Special Permit approval from the Commission in 2025 for a 3-bay 
commercial building; however, the approval received was for one unit only, Unit A. This 
was because at the time of application submission, it was understood there were no 
tenants identified for the remaining two units. The applicant is seeking permission to 
occupy the other two units for his business, Briggs Lawn Care. It was indicated that one, 
five-gallon waste oil storage container with spill kit will be provided in each unit and 
there is no need for additional parking spaces. There will be no additional outdoor 
storage, and a modification was requested regarding the dumpster enclosure. The 
applicant explained that he approved dumpster enclosure was a vinyl stockade fence on 
three sides with a swing gate on the front. However, when constructing the enclosure, he 
installed a chain link fence with privacy slats on three sides and a swing gate on the front. 
He would like to keep this enclosure as is. There was no public comment, and the public 
hearing closed at 7:15 p.m. 
 

Page 3 · open in PDF

2 
7. Receive applications and schedule public hearing (if applicable) 
None 
 
8. Consideration of applications, where the Commission has concluded the public hearing 
a. Application seeking to modify a Site Plan and Special Permit under Zoning 
Regulations Sections 3.5.4.3 and 8.21.4 for a commercial building in the Aquifer 
Protection Overlay Zone with outdoor storage, for property located at 14 Mill Pond 
Drive, C2 Zone. 
ON A MOTION by E. Myers seconded by P. Johnson, the Commission voted (7-0-0) to 
approve an application seeking to modify a Site Plan and Special Permit under Zoning 
Regulations Sections 3.5.4.3 and 8.21.4 for a commercial building in the Aquifer 
Protection Overlay Zone with outdoor storage, for property located at 14 Mill Pond 
Drive, C2 Zone; subject to the following conditions: 
1. Applicant to occupy Units A, B and C. 
2. One, five-gallon waste oil storage container with spill kit is allowed per unit. 
3. The modified dumpster enclosure currently in place is approved. 
4. All Aquifer Protection Overlay Zone requirements and safety protocols remain in 
effect. 
5. No additional outdoor storage of equipment is permitted (see Volume 470 Page 922-
923 #8 for approved outdoor storage).  
6. No additional changes to the previously approved Special Permit are permitted 
(Volume 470 Page 922-923). 
 
9. Commission Discussion: PA 25-1 Transit Community Middle Housing Developments 
(2-9 Residential Units) and Mixed-Use in Commercial Zones 
A. Kenyon provided a memo outlining Public Act 25-1, which requires the Planning and 
Zoning Commission to amend its zoning regulations to address middle housing. Said housing 
is classified as a residential development with 2 to 9 housing units and a mixed-use 
development with residential and commercial uses. Per the legislation, this is to be allowed 
by summary review in commercial zones. The Commission deliberated on which zones are 
considered commercial zones and agreed that transit community middle housing and mixed-
use developments would be permitted in the COCE, CC, C2, ED and T1 Zones. Staff 
presented options outlining how transit community middle housing development and mixed-
use would be addressed within the regulations, and a sample regulation was provided by the 
Town Attorney. After further deliberation, it was recommended that staff review the sample 
regulation and pull in any/all applicable information into the existing zones, while 
strengthening the current regulations. 
 
10. Appointment to the Regional Planning Commission 
R. Lavitt will continue to serve on the Regional Planning Commission. Since Commissioner 
Chinni was absent, she will be consulted to see if she would like to continue to serve.  
 
11. POCD Committee Update 
The second public workshop will be held on Thursday, March 12th at 7:00 p.m. at the Granby 
Senior Center. 
 

Page 4 · open in PDF

3 
12. Staff Report and Correspondence 
A. Kenyon stated that the sale of 83 Salmon Brook Street was approved at the March 5th 
Town Meeting, and the Development Commission began reviewing the tasks outlined within 
the adopted Granby Center Study Recommendations at their last meeting.  
 
13. Commissioner Reports and Correspondence 
Commissioner Sheahan stated that no progress has been made regarding the cleanup at 379 
North Granby Road. A. Kenyon provided a status update regarding the tenant’s non-
compliance with the PZC and IWWC approvals and has been in contact with the property 
owners. Fines have been accruing since the first citation was issued in November of 2024 and 
the next step is the issuance of a second notice in which a hearing before a Hearing Officer 
may be requested.   
 
14. Adjourn 
 
ON A MOTION by E. Lukingbeal seconded by P. Johnson, the Commission voted (7-0-0) 
to adjourn the meeting at 8:00 p.m.  
 
Respectfully submitted, 
 
 
 
Renee Deltenre 
 

Page 5 · open in PDF

TOWN OF GRANBY 
 
 
 
MEMORANDUM   
 
TO: Planning and Zoning Commission 
 
FROM:  Abby Kenyon, Director of Community Development 
 
DATE:  April 9, 2026 
 
RE: Commission Discussion: Proposed zoning regulation changes for Transit Community 
Middle Housing Developments (2-9 Residential Units) and Mixed-Use in Commercial 
Zones 
______________________________________________________________________________ 
As previously discussed during the joint Board of Selectmen and Planning and Zoning 
Commission, Governor Lamont recently signed HB 8002 An Act Concerning Housing Growth 
into law (Public Act 25-1). This bill will require the Planning and Zoning Commission to amend 
its zoning regulations to address middle housing, which is  a residential development with 2 to 9 
housing units, mixed -use, and parking space requirements for residential uses.  The changes are 
effective July 1, 2026.  
The Commission discussed this at the meeting in March. It was decided that the use applies to the 
C2, CC, COCE, ED, and T1 Zones.  
Attached is a draft regulation address Transit Community Middle Housing Developments. 
Following the draft regulation, is an attachment with illustrations that correspond to several of the 
proposed sections. It is noted that there are specific decision points/questions to be addressed and 
discussed further. 
 

Page 6 · open in PDF

3 
SECTION 6     MINIMUM FLOOR AREAS 
 
6.1   Minimum Floor Area for Single Family Dwelling 
6.2   Floor Areas for Living Quarters 
6.3   Minimum Floor Area for Accessory Apartment 
6.4   Minimum Floor Area for Multi-Family Structures 
6.5   Minimum Floor Area for Unfinished Second Story 
 
SECTION 7     OFF-STREET PARKING 
 
7.1   Parking Space 
7.2   Description of Parking Spaces 
7.3   Location of Parking Spaces 
7.4   Parking Space Requirements 
7.5   Aisle Width 
7.6   Off-Street Loading of Trucks 
7.7   Surface Treatment 
7.8   Maintenance 
7.9   Reduction of Parking Spaces 
 
SECTION 8      SPECIAL REGULATIONS 
 
8.1   Accessory Buildings and Uses 
8.2   Special Permits 
8.3   Alcoholic Beverages 
8.4   Special Commercial Assembly Use 
8.5   Accessory Apartment 
8.6   Signs 
8.7   Sedimentation and Erosion Control 
8.8   Customary Home Occupations 
8.9   Retail Sale of Antiques 
8.10 Bed and Breakfast or Inn 
8.11 Open Space and Recreation Overlay Zone 
8.12 Transitional Office Use 
8.13 Residential Uses in Non-Residential Zones 
8.14 Rear Lots 
8.15 Agriculture 
8.16 Restaurants 
8.17 Self-Service Storage Facilities 
8.18 Special Flood Hazard Areas 
8.19 Residential/Recreational Development 
8.20 Flexible Residential Development (FRD) 
8.21 Aquifer Protection Overlay Zone 
8.22 Home Instruction 
8.23 Rear Lots in Commercial Zones 
8.24 Adult Oriented Establishment 
8.25 Utility Use 
8.26 Wireless Telecommunication Sites 
8.27 Active Adult Residential Development 
8.28 Residential Landscape Business 
8.29 Alternative Energy Systems 
8.30 Transit Community Middle Housing Development 
 

Page 7 · open in PDF

SECTION 1 
INTRODUCTION 
 
11 
  
 LOT COVERAGE: That percentage of the lot area that is covered by the roof area of all buildings 
on the lot. 
  
 LOT DEPTH: The distance measured along either a line perpendicular to the street right of way or 
radial to curved street from the mid-point of the lot frontage to the rear of the lot. 
  
 LOT LINES, FRONT: All lines dividing the lot from the street or streets right-of-way. 
  
 LOT FRONTAGE: The distance between the side lot lines measured at a distance fifty (50) feet 
back from and parallel to the street line. 
  
 MIXED-USE DEVELOPMENT: A development containing one or more multifamily or single-family 
dwelling units and one or more commercial, public, institutional, retail, office or industrial uses. 
  
 MOTOR VEHICLE: Any motor passenger vehicle (including taxis and livery vehicles, but 
excluding busses), any truck not exceeding a one-ton capacity and any motor vehicle which is 
primarily used for agriculture or for maintenance on the premises. 
  
 MULTI-FAMILY DWELLING: A dwelling containing two (2) or more dwelling units. If such 
dwelling contains two to nine units and is in the C2, CC, COCE, ED or T1 Zone, it may be 
considered a Transit Community Middle Housing Development. 
  
 NON-AGRICULTURAL EVENT: A single day event with a defined start and end time that is not 
directly related to agriculture. The event is an accessory use on a property having a principal 
agricultural or farming use. 
  
 NON-CONFORMING: (e.g., non-conforming use, building or structure) Non-conforming to the 
applicable requirements or provisions of these Regulations. 
  
 NON-PROFIT ORGANIZATION: An organization exempt from Federal Income Tax under Section 
501 € or successor provision of the Internal Revenue Code. 
  
 NURSERY: An agricultural operation, the primary use of which is the growing of flowers, plants, 
shrubs or trees for commercial gain. 
  
 ON-SITE WIND ENERGY FACILITY: All equipment and structures utilized in connection with the 
conversion of wind to electricity located at a residential, commercial, industrial, agricultural, 
institutional, or public facility that will consume more than 50% of the electricity generated by the 
facility. This includes but is not limited to, transmission lines and support structures, storage, 
collection and supply equipment, transformers and wind turbines. 
  
 OPEN SPACE LAND: Any land used for agriculture, a recreational corridor, a park, a natural 
area, forest, wetland preservation, wildlife habitat, a reservoir, historic and scenic preservation or 
other similar purpose. 
  
 PERSONAL SERVICE: Shops such as barbershops, beauty salons, tailoring establishments, 
shoe repair shops and other similar operations, which provide services of a personal, domestic 
nature. 
  
 PREMISES: All land comprising a lot and including all buildings, structures and uses located on 
the lot. 
  
 PROFESSIONAL OFFICE: An office of recognized professions with or without staff, such as 
doctors, dentists, lawyers, architects, engineers, planners, landscape architects, artists, 

Page 8 · open in PDF

SECTION 1 
INTRODUCTION 
 
14 
  
STORY, FIRST: The lowermost story entirely above the grade plane. 
  
 STREET: Shall mean and include streets, avenues, boulevards, roads, lanes, highways and any 
other thoroughfares, which afford a principal means of access to abutting properties, which are 
accepted by the Town or the State or shown on a recorded subdivision plan approved by the 
Commission. Streets shall also include private streets identified, approved and shown on a plan of 
subdivision recorded in the Granby Land Records. 
  
 STREET LINE: The line separating a street right-of-way from adjoining property, not the paved or 
traveled roadway. 
  
 STRUCTURE: Anything constructed or erected which requires location on the ground or 
attachment to something having location on the ground. 
 
SUMMARY REVIEW: An application able to be approved in accordance with the terms of a 
zoning regulation or regulations, including, but not limited to, requirements concerning setbacks, 
lot size and building frontage, applicable to a proposed development, and without requiring that a 
public hearing be held, a variance, special permit or special exception be granted or some other 
discretionary zoning action be taken, other than a determination that a site plan is in conformance 
with applicable zoning regulations and that public health and safety will not be substantially 
impacted.  
 
TRANSIT COMMUNITY MIDDLE HOUSING DEVELOPMENT: A residential building containing 
not less than two dwelling units but not more than nine such units, including, but not limited to, 
townhouses, duplexes, triplexes, perfect sixes, and cottage clusters, subject to summary review. 
 
• Townhouse: A residential building constructed in a grouping of three or more attached 
units, each of which shares at least one common wall with an adjacent unit and has 
exterior walls on at least two sides.  
 
• Duplex: A residential building containing two distinct dwelling units. 
 
• Triplex: A residential building containing three distinct dwelling units. 
 
• Perfect Six: A three-story residential building with a central entrance containing two 
dwelling units per story. 
 
• Cottage Cluster: A grouping of at least four detached housing units, or live work units, per 
acre that are located around a common open area. 
  
 UTILITY USE: Uses, structures and equipment necessary to provide the community with 
electricity, cable television, telephone and other communication service, water, gas and other 
similar community needs whether or not they are owned and/or operated by a public, quasi-public 
or private company. 
  
 Utility uses include but are not limited to telephone and other communication switching stations, 
electrical substations, sewer pumping stations, water towers, and water pressure boosting 
facilities. Utility offices and other commonly occupied utility buildings and telecommunications 
towers are not included within this definition. 
  
 WATERCOURSES: Rivers, streams, waterways, lakes, ponds, marshes, swamps, bogs, 
intermittent water courses and all other bodies of water natural or artificial, public or private which 
are contained within or flow through the Town of Granby. 
  

Page 9 · open in PDF

SECTION 3 
USE DISTRICTS 
 
21 
 The following uses are permitted: 
  
3.3.1.1 Uses allowed in Section 3.1.1. 
  
3.3.2 Special Permits 
  
 The Commission may grant Special Permits for the following uses, subject to the 
applicable criteria of Section 8.2, Active Adult Residential Development, subject to 
Section 8.27. 
  
3.3.2.1 All uses allowed in Section 3.1.2 other than special commercial assembly uses. 
  
3.3.2.2 The parking and storage of public and private school buses (all with valid state 
registrations) in use by the Granby School System, with dispatching offices and fuel 
storage for such buses on a parcel of not less than three (3) acres.  
  
3.3.3 Required Lot Areas, Yards, Coverage, Heights and Frontages. 
  
 For required lot area, yards, coverage, height and frontage, refer to Section 5. 
  
3.4 RESERVED 
  
3.5 BUSINESS ZONE (C2) 
  
3.5.1 Permitted Uses 
  
 The following uses shall be permitted: 
  
3.5.1.1 Retail sale, rental and/or repair of items such as food, clothing, hardware, garden 
supplies, jewelry, electronics, appliances, books, sporting goods, nursery items, home 
improvement products and general merchandise; 
  
3.5.1.2 Printing, photography and similar service; and  
  
3.5.1.3  Accessory uses customarily incidental to a permitted use; 
  
3.5.1.4         Utility Use, Subject to Section 8.25.6; 
  
3.5.1.5 Business or professional offices, including financial institutions; 
  
3.5.1.6 Personal services, including barbershops, beauty shops, cleaning establishments, 
tailor shops and shoe repair shops; 
  
3.5.1.7 
 
3.5.1.8 
 
3.5.1.9 
Limited seating restaurants. 
 
Transit Community Middle Housing Development, subject to Section 8.30. 
 
Mixed-Use Development. 
  
3.5.2 Special Permits 
  
 The Commission may grant Special Permits for the following uses, subject to the 
applicable criteria of Section 8.2: 
  
3.5.2.1 Restaurants subject to Section 8.16; 
  

Page 10 · open in PDF

SECTION 3 
USE DISTRICTS 
 
30 
 Understanding the attributes of the ED Zone, as outlined above, the Town has an 
opportunity to encourage development within this area in a manner that can be a 
model of quality and success. The development of the ED Zone can demonstrate that 
preservation and growth are not mutually exclusive and that diversification of the 
Town’s tax, employment and commercial service base, while preserving the Town’s 
fundamental values and rural atmosphere, can be achieved. A variety of Special 
Regulations have been adopted to regulate development within this ED Zone. These 
Regulations are found in Section 3.9.4. 
   
3.9.1 Permitted Uses, subject to the Special ED Zone Criteria outlined herein. 
  
 The following uses are permitted: 
   
3.9.1.1 Business or professional offices, including financial institutions and/or office parks; 
   
3.9.1.2 Utility Use, subject to Section 8.25.6; 
   
3.9.1.3 Agricultural uses; 
   
3.9.1.4 Governmental buildings and facilities including fire houses; and 
   
3.9.1.5 
 
 
 
3.9.1.6 
 
3.9.1.7 
Accessory uses customarily incidental to principal uses, including garages, storage 
buildings, and employees’ recreational, commissary and clinical facilities, subject to 
Section 8.1. 
 
Transit Community Middle Housing Development, subject to Section 8.30. 
 
Mixed-Use Development. 
   
3.9.2 Special Permit Uses, subject to the Special ED Zone Criteria and to Section 8.2. 
  
 The Commission may grant Special Permits for the following uses, subject to the 
applicable criteria of Section 8.2: 
   
3.9.2.1 Biological, medical, technological and other research and development centers; 
   
3.9.2.2 Commercial recreational facilities, including health clubs, indoor and outdoor 
recreational complexes and all associated fields, courses, buildings and equipment;  
   
3.9.2.3 Health care facilities including hospitals, convalescent homes, nursing homes and 
similar uses; 
   
3.9.2.4 Assisted Living facilities for elderly persons and/or persons with special needs; 
Section 3.7.4 shall be used as a basic guideline in the development of such facilities; 
   
3.9.2.5 Restaurants, subject to Section 8.16; 
   
3.9.2.6 Private schools with or without dormitories and other associated structures, fields and 
uses; 
   
3.9.2.7 Retail sale, rental and/or repair of items such as food, clothing, hardware, garden 
supplies, jewelry, electronics, appliances, books, sporting goods, nursery items, home 
improvement products and general merchandise; 
   
3.9.2.8 Funeral homes and associated uses and structures; 
   

Page 11 · open in PDF

SECTION 3 
USE DISTRICTS 
 
37 
 The minimum criteria that follow are reductions in the requirements outlined within 
Section 5. While the Commission may approve lots that comply with the reduced 
criteria, all subdivided lots must be in compliance with the Subdivision Regulations 
and all Zoning Regulations not specifically reduced herein.  
  
MINIMUM 
  
 a. Lot Area            50,000 sq. ft. 
 b. Frontage           50 ft. 
 c. Front Yard         30 ft. 
 d. Side Yard          15 ft. 
 e. Rear Yard         15 ft. 
 f. Lot Depth          200 ft. 
  
3.10 NEIGHBORHOOD AND COMMERCIAL TRANSITION ZONE – T1 
  
3.10.0  Goal of the T1 Zone 
  
 The T1 zone is adopted in an effort to avoid the development of small commercial 
establishments along Route 10, through the elimination of an existing commercial 
strip zone. The T1 zone encourages comprehensive development and the 
cooperation of individual landowners. A primary goal of the zone is to avoid the 
establishment of commercial curb cuts along Route 10, while requiring that new 
commercial buildings be placed at least 100 feet back from Salmon Brook Street. 
  
 The T1 zone is designed to provide a transition of uses, from high intensity 
commercial use to residential use. This transition can be achieved by combining 
existing lots, limiting new curb cuts along Route 10, limiting the size of commercial 
buildings, regulating the style and quality of construction and establishing buffer 
areas. The objective is to create a unified commercial or mixed-use area, developed 
with an internal service road. All applications for development within the T1 zone must 
take into account this concept for an internal roadway. Designs that will prevent the 
possibility of bringing this concept to fruition shall not be approved. 
  
 The transitional zone is created in recognition of the commercial growth that is 
occurring in this area, the relocation of the Canton Road intersection, the availability 
of public water and public sewer and the Town’s overall success in limiting curb cuts 
and managing traffic flow within the overall area. 
  
 The following regulations and standards are designed to bring about the above goal. 
  
3.10.1 Permitted Uses 
  
 The following uses are permitted: 
  
3.10.1.1 Single-family dwellings; 
  
3.10.1.2    Home occupations, subject to Section 8.8; 
  
3.10.1.3 Accessory uses customarily incidental to permitted uses, subject to Section 8.1; and 
  
3.10.1.4 
 
 
3.10.1.5 
 
Family Child Care Home or Group Child Care Home, located in a residence and 
licensed by the Office of Early Childhood. 
 
Transit Community Middle Housing Development, subject to Section 8.30. 
 

Page 12 · open in PDF

SECTION 3 
USE DISTRICTS 
 
38 
3.10.1.6 Mixed-Use Development. 
  
3.10.2 Special Permits Uses, subject to the Special T1 Zone Criteria and Section 8.2. 
  
3.10.2.1 Commercial educational facilities, including day care centers, other than Family Child 
Care Home or Group Child Care Home, located in a residence and licensed by the 
Office of Early Childhood, in public, private and institutional buildings with a valid state 
license; 
  
3.10.2.2 Bed-and-breakfast facilities, inns and motels; 
  
3.10.2.3 Business or professional offices, including financial institutions and/or office parks; 
   
3.10.2.4 Commercial recreational facilities, including health clubs, indoor and outdoor 
recreational complexes and all associated fields, courses, buildings and equipment;  
   
3.10.2.5 Restaurants, subject to Section 8.16; 
   
3.10.2.6 Retail sale, rental and/or repair of items such as food, clothing, hardware, garden 
supplies, jewelry, electronics, appliances, books, sporting goods, nursery items, home 
improvement products and general merchandise; 
   
3.10.2.7 Personal services, including, but not limited to barbershops, beauty shops, cleaning 
establishments, nail salons and appliance and other general repair shops, excluding 
automobile repair; 
   
3.10.2.8 Nursing homes with a maximum density of 15 beds per acre; 
  
3.10.2.9 Elderly housing with a maximum density of 10 units per acres; 
  
3.10.2.10 Active Adult Residential Development, in general conformity with the standards set 
forth in Section 8.27.3, except where such standards are in conflict with the T1 Zone 
Criteria of Section 3.10.3; 
  
3.10.2.11 Assisted living facilities, independent living facilities, multi-family residential 
developments with 10 units or more and similar residential uses with a maximum 
density of 8 units per acre; 
  
3.10.2.12 Accessory uses customarily incidental to principal uses. 
  
3.10.2.13 Mixed use building containing both residential and non-residential uses. 
  
3.10.3 Special T1, Zone Criteria 
  
3.10.3.1 The Special Permit uses listed above may only be approved on a lot which contains a 
minimum of 4 acres.  
  
3.10.3.2 Maximum area of the footprint of a single commercial building is 20,000 square feet. 
  
3.10.3.3 All commercial buildings must be clearly separated by a minimum of 30 feet. 
  
3.10.3.4 The establishment of commercial uses that do not currently exist within the Town shall 
be preferred over the replication of existing uses.  
  
3.10.3.5 The combined area of the footprints of all commercial buildings must be less than or 
equal to 20% of the total land area. (Example: 4.6 acres = 200,376 square feet. 20% 

Page 13 · open in PDF

SECTION 3 
USE DISTRICTS 
 
45 
enacted to further the goals and objectives of the Plan of Conservation and 
Development by expanding the Town Center through the incorporation of compatible 
commercial, residential, governmental, educational and other uses often found within 
a traditional town center. The further goal of the zone is to encourage the continued 
rehabilitation of the commercial center, encourage a greater variety of mixed uses and 
unite the uses through common design features, pedestrian and vehicular access, 
common signage, lighting and through the inclusion of street furniture and common 
open areas. Overall, the goal is to integrate commercial and noncommercial uses 
through the creation of a mixed-use district that has the look and feel of a traditional 
New England village. The Granby Center Zone is designed to maintain and promote 
an area where residential development can exist within reasonable proximity to 
commercial type development. Development in the District will be guided by an overall 
desire to create a thriving Village with a wide variety of businesses and housing where 
residents can walk to work, work from home and walk from business to business. 
While the District is certainly designed to permit a variety of commercial 
developments, encourage new and innovative housing development, and preserve 
the Granby Historic District, overall, it is designed to establish a sense of place that is 
different from the low-density housing and preserved open space that characterize 
most of the Town of Granby. 
  
 
The Granby Center Zone is designed to: promote the efficient use of a limited land 
area; respect and reinforce historic development patterns; provide flexibility to meet 
changing needs, technologies, economics and consumer preferences; promote 
efficient development patterns and a land use mix which encourages walking and 
bicycling and encouraging compatible architectural styles, building forms and building 
relationships within a New England Village. 
  
 
The Granby Center Zone consists of four components all as outlined within the 
Granby Zoning Map: 
  
 Commercial Center; 
  
 Center Commons; 
  
 Center Edge, and 
  
 Granby Center Historic Overlay District. 
  
 
Each of these zones has a separate set of permitted and special permit uses and 
design criteria. The Comprehensive Granby Center Zone Criteria shall be applied to 
all 4 components of the Center Zone. 
  
3.12.1 Commercial Center Zone 
  
 
The Commercial Center is the primary commercial area within the Town of Granby. It 
contains a variety of retail, service and office uses, numerous restaurants, gas 
stations, banks, the Post Office and more. The Commercial Center contains the Town 
Green and serves as the primary gathering place for Town residents. The Commercial 
Center contains very few residential units, and its current design pattern discourages 
residential use. Future residential use is not anticipated within the area. 
  
3.12.1.1 Commercial Center Zone Permitted Uses 
  
 
In the Commercial Center Zone, the following uses are permitted subject to the 
Commercial Center Zone Special Criteria, Section 4 and other applicable 
requirements. 

Page 14 · open in PDF

SECTION 3 
USE DISTRICTS 
 
46 
  
3.12.1.1.1 Business or professional offices; 
  
3.12.1.1.2 Restaurant, limited seating. 
  
3.12.1.1.3 Transit Community Middle Housing Development, subject to Section 8.30. 
  
3.12.1.1.4 Mixed-Use Development. 
 
3.12.1.2 Commercial Center Zone Special Permit Uses 
  
 In the Commercial Center Zone, the following uses may be permitted by Special 
Permit, subject to the Commercial Center Zone Special Criteria, Section 8.2 and other 
applicable requirements. 
  
3.12.1.2.1  Retail sale, rental and/or repair of items such as food, clothing, hardware, garden 
supplies, jewelry, electronics, appliances, books, sporting goods, nursery items, home 
improvement products and general merchandise; 
  
3.12.1.2.2 Printing, photography and similar service; 
  
3.12.1.2.3 Banks and other financial institutions; 
  
3.12.1.2.4 Personal services, including barbershops, beauty shops, cleaning establishments; 
  
3.12.1.2.5 Day Care centers, preschool and similar uses; 
  
3.12.1.2.6 Museums/galleries/performing arts; 
  
3.12.1.2.7 Mixed use building containing both residential and non-residential uses;  
  
3.12.1.2.8 Movie theatres with a maximum of 80 seats; 
  
3.12.1.2.9 Restaurants subject to Section 8.16; 
  
3.12.1.2.10 Commercial educational, instructional or recreational services; 
  
3.12.1.2.11 Fueling stations for motor vehicles, without Vehicle Repairers; 
  
3.12.1.2.12 Utility Use, Subject to Section 8.25.5; 
  
3.12.1.2.13 Retail sales or alcoholic beverages, subject to Section 8.3; 
  
3.12.1.2.14 Open air markets; 
  
3.12.1.2.15 Multifamily use with 10 units or more. 
  
3.12.1.3 Commercial Center Zone Special Criteria 
  
 
The maximum area of the footprint of a single commercial building is 8,000 square 
feet. The Commission may permit an expansion of an existing building (existing on 
the date of approval of this regulation) that would increase the footprint above 8,000 
square feet, where such expansion conforms to the general principles of the zone. 
Where an existing building is removed/demolished in whole or in part, the 
Commission may permit the reconstruction or new construction of a building that 
exceeds a footprint of 8,000 square feet, provided the construction is in basic 

Page 15 · open in PDF

SECTION 3 
USE DISTRICTS 
 
47 
conformity with the scale of the existing site and conforms to the general principles of 
the zone. As a general rule the Commission shall encourage the construction of multi-
story buildings, with reduced footprints. 
  
 
Parking requirements shall be as outlined within Section 7. The Commission may 
waive the specific requirements regarding the number and location of parking spaces 
to achieve the goals of the zone as stated herein. Individual developments are 
encouraged to share parking and access. Shared parking can be used to comply with 
the parking requirements. 
  
 
The Commission may waive the minimum landscape area of Section 4.2.5 to achieve 
the goals of this zone as stated herein. 
  
 
Adjacent property owners are encouraged to share curb cuts leading to the adjacent 
roadways. No new curb cuts will be permitted within this zone, except that any 
existing lot legally establish prior to the date of adoption of this regulation shall have 
the right to access the adjacent roadway. Existing curb cuts may be relocated. 
  
 
Pedestrian access to the proposed building, from the nearest street, shall be 
incorporated within the site design. Pedestrian and vehicular access from adjacent 
sites shall be incorporated where feasible. 
  
 
Required Lot Areas, Yards, Coverage, Heights and Frontages shall be as outlined for 
the C2 Zone in Section 5, except that the minimum front yard shall be 25 feet. This 
change is made in an effort to encourage parking at the rear and sides of the building 
and to aid in design interest and flexibility. 
  
3.12.2 Center Commons 
  
 
The Center Commons Zone is a diverse area of office buildings, public service use, 
retail use and housing. It contains the Granby Town Hall, Police Department, 
Senior/Youth Center, Board of Education Building, Library and the Granby Cemetery. 
The area contains significant commercial uses particularly along Route 189 and 
Route 20. The zone also contains the Town’s 2 elderly housing developments, the 
Granby Memorial High School and Middle School. The Center Commons contains a 
small number of historic homes that are a part of the Granby Historic District. The 
Center Commons area is closely integrated with the Commercial Center. The area is 
appropriate for additional commercial development and home based business is 
encouraged within the zone. Mixed residential and commercial use can be expanded 
throughout the area. Residents and commercial users of the area should be afforded 
easy pedestrian access throughout the entire center area. New multifamily housing 
can be accommodated within the area. 
  
3.12.2.1 Center Commons Zone Permitted Uses 
  
 
In the Center Commons Zone, the following uses are permitted subject to the Center 
Commons Zone Special Criteria, Section 4 and other applicable requirements. 
  
3.12.2.1.1 Single-family dwellings; 
  
3.12.2.1.2 Home occupations, subject to Section 8.8; 
  
3.12.2.1.3 Multifamily use with 10 units or more, subject to section 3.7 on a property containing 5 
or more acres; 
  
3.12.2.1.4 Agriculture, subject to Section 8.15; 

Page 16 · open in PDF

SECTION 3 
USE DISTRICTS 
 
48 
  
3.12.2.1.5 Governmental buildings and facilities including fire houses; 
  
3.12.2.1.6 Accessory uses customarily incidental to permitted uses, subject to Section 8.1; 
  
3.12.2.1.7 Utility Use, subject to Section 8.25.6; 
  
3.12.2.1.8 Attached accessory apartment, subject to Section 8.5.1; 
  
3.12.2.1.9 Family Child Care Home or Group Child Care Home, located in a residence and licensed by 
the Office of Early Childhood. 
  
3.12.2.1.10 Transit Community Middle Housing Development, subject to Section 8.30. 
  
3.12.2.1.11 Mixed-Use Development. 
  
3.12.2.2 Center Commons Zone Special Permit Uses 
  
 In the Center Commons Zone the following uses may be permitted by Special Permit, 
subject to the Center Commons Zone Special Criteria, Section 8.2 and other 
applicable requirements: 
  
3.12.2.2.1 Retail sale, rental and/or repair of items such as food, clothing, hardware, garden 
supplies, jewelry, electronics, appliances, books, sporting goods, nursery items, home 
improvement products and general merchandise; 
  
3.12.2.2.2 Printing, photography and similar service; 
  
3.12.2.2.3 Business or professional offices, including banks and other financial institutions; 
  
3.12.2.2.4 Personal services, including barbershops, beauty shops, cleaning establishments; 
  
3.12.2.2.5 Day Care centers, preschool and similar uses; 
  
3.12.2.2.6 Museums, art studios, galleries and performing arts facilities; 
  
3.12.2.2.7 Bed and breakfast establishments; 
  
3.12.2.2.8 Restaurants, limited seating; 
  
3.12.2.2.9 Restaurants subject to Section 8.16; 
  
3.12.2.2.10 Commercial educational, instructional or recreational services; 
  
3.12.2.2.11 Retail sales or alcoholic beverages, subject to Section 8.3; 
  
3.12.2.2.12 Open air markets; 
  
3.12.2.2.13 Churches, religious buildings, Places of worship and cemeteries and other similar 
organizations; 
  
3.12.2.2.14 Neighborhood Retirement Housing, Assisted Living and Congregate Care Elderly 
housing developments; 
  
3.12.2.2.15 Mixed use buildings containing both residential and nonresidential uses; 
  

Page 17 · open in PDF

SECTION 3 
USE DISTRICTS 
 
52 
overlay district generally follows the boundaries of the Granby Center Historic District, 
a large and beautiful area that is listed on the National Register of Historic Places. 
  
 
The Granby Center Historic Overlay District is not a separate zone, but an area which 
overlays upon the other Center Zones. Within the Granby Center Historic Overlay 
District additional requirements and regulations will be applied as specifically outlined 
with the Center Zones. 
  
3.12.5 Comprehensive Granby Center Zone Criteria 
  
 The following requirements and guidelines shall apply to all Center Zones: 
  
3.12.5.1 The primary and most appropriate use of existing homes within the Granby Center 
Historic Overlay District portion of the Center Edge zone is residential use; 
  
3.12.5.2 The Planning and Zoning Commission shall notify the Salmon Brook Historical 
Society, within 10 days of the receipt of any application that includes a property, or 
any portion of a property located within the Granby Center Historic Overlay District; 
  
3.12.5.3 Due to the historic nature of the buildings and the desire to maintain the traditional 
quality of the existing landscape, any proposed re-use or renovation of buildings 
located within the Granby Center Historic Overlay District shall be accomplished in a 
manner which preserves the historic integrity of the building’s exterior façades and 
preserves the traditional design of the grounds, particularly the front area facing the 
street; 
  
3.12.5.4 The conversion of low-density housing to multifamily housing is generally encouraged, 
except within the Granby Center Historic Overlay District;   
  
3.12.5.5 Design criteria for multifamily developments shall generally follow the criteria of the 
PDM Zone, Section 3.7.4, except that a maximum number of 15 units per acre may 
be permitted. Structures that are visible from Salmon Brook Street shall be designed 
to blend with the historic designs typically found within the Granby Center Historic 
Overlay District. Multi-story structures are preferred over single story structures; 
  
3.12.5.6 When considering Special Permit applications, the Commission shall encourage the 
establishment of commercial uses that do not currently exist within the Town Center 
area. The zone’s permitted uses will be preferable to the establishment of uses that 
are allowed only by Special Permit where such special permit uses replicate existing 
center businesses. The Commission, the public and new applicants should recognize 
the limited area of the Town Center and the need to diversify the commercial uses. 
The success of the center as a local commercial service center is largely dependent 
on the availability of a wide range of commercial retail items, services and offices. An 
abundance of offices (permitted uses) will enhance the overall business environment 
as the office workers are likely to frequent the other center businesses during the 
morning, lunch and dinner times; 
  
3.12.5.7 Multi-storied buildings are preferred over single story buildings. Single use one story 
structures shall be discouraged except in unique situations where the property cannot 
support a multi-story structure and multiple uses; 
  
3.12.5.8 Where mixed use buildings are proposed that will contain both residential and 
nonresidential uses, the number of residential units may not exceed 15 per acre. 
Living units shall typically be located above the first floor and shall be serviced by 
elevators and fire prevention sprinkler systems. One parking space per unit shall be 

Page 18 · open in PDF

SECTION 3 
USE DISTRICTS 
 
53 
required. Overall the density of the site will be guided by the site development 
requirements outlined herein; 
  
3.12.5.9 Applications for new commercial construction shall include an analysis of the 
anticipated vehicular traffic that will be generated by the proposed use. Of specific 
concern are the peak hour traffic and the related turning movements of vehicles 
during the peak hours. The Commission shall strive to establish a mix of commercial 
uses, which differ in their peak hours of traffic generation; 
  
3.12.5.10 Parking requirements shall be as outlined within Section 7. The Commission may 
waive the specific requirements regarding the location of parking spaces to achieve 
the goals of the zone as stated above. Vehicular access and parking shall be 
designed to permit passage between adjacent properties. Shared parking is strongly 
encouraged;   
  
3.12.5.11 Curb cuts shall be closely scrutinized by the Commission. The existing traffic flow 
within the area is often delayed and poorly placed curb cuts and/or increased 
numbers of curb cuts will exacerbate the problem. Therefore, the Commission shall 
require the sharing of curb cuts between property owners and may prohibit a proposal 
for non-residential use of property where the curb cut separation is found to be 
unsatisfactory. A minimum distance of 150 feet between curb cuts is preferred; 
  
3.12.5.12 A system of sidewalks, designed for the convenience of pedestrian traffic, shall be 
incorporated in all proposed development applications. Sidewalks shall be designed 
and constructed to serve pedestrian movement within each proposed site and with 
consideration of linkages to adjacent sites. Proposed site plans shall also include 
provisions for pedestrian and non-motorized amenities, such as benches (stand alone 
or permanent fixture), garbage receptacles, and bicycle racks. All site designs shall 
include sidewalks, which lead from the existing street to the proposed or re-used 
structure. The application shall include a pedestrian access plan that links the 
proposed site to other properties within the Center; 
  
3.12.5.13 Extensive use of street trees and curbside landscaping should characterize the 
developments; 
  
3.12.5.14 Businesses developments shall consider incorporating outdoor plaza areas containing 
benches, trash receptacles, landscaping, instructional signage, and partial shelter 
(such as a gazebo or awning). Outdoor plazas may also be characterized by 
substantial defining central amenities, such as a fountain, a clock tower or public art. 
Outdoor Plaza areas should be centrally located, insofar as possible. Restaurant uses 
having outdoor cafes are encouraged; 
  
3.12.5.15 No goods, merchandise, equipment or machinery shall be stored or displayed outside 
of a building unless the areas are specifically authorized by the Commission as a part 
of a site plan or special permit approval. Parking spaces and landscaping areas shall 
not be used for the sales, storage, and display of goods or for advertising purposes of 
any kind, except for detached signs installed in conformance with these Regulations; 
  
3.12.5.16 All commercial activity shall be conducted wholly within enclosed buildings, except for 
off-street loading, periodic sidewalk sales and other operations normally conducted 
outdoors, and excepting other uses specifically authorized by the Commission as part 
of a site plan or special permit approval; 
  
3.12.5.17 Ground mounted mechanical equipment may be located along a rear façade but 
should be screened from view. Screening shall be designed with materials that mimic 
or complement those used in the primary structure; 

Page 19 · open in PDF

SECTION 3 
USE DISTRICTS 
 
54 
  
3.12.5.18 Roof mounted mechanical equipment shall be screened from public view; 
  
3.12.5.19 Utilities shall normally be located underground; 
  
3.12.5.20 Site lighting shall be designed as the absolute minimum necessary to achieve the 
desired purpose. All exterior light poles and lighting fixture must of a type and style 
that mirrors the existing poles and fixtures located along Bank Street. These are often 
identified as traditional style and can be found in figure 2 outlined below. The height of 
pole, to the top of the fixture shall be between 9-14 feet; 
  
3.12.5.21 Noise is a community concern and should be considered in the site design and 
measures taken to reduce its impact, in the design of all developments. Care should 
be taken to buffer areas of potential noise by shielding such areas through the 
strategic placement of plantings, buildings, earth berms or through a combination of 
these and other appropriate techniques; 
  
3.12.5.22 All freestanding and directory signs shall be of wood (simulated wood or wood 
composite) construction and suspended from either one or 2 poles as outlined in 
figure 3 below. Signs shall be externally illuminated with the light typically emitted onto 
the face of the sign from a fixture or fixtures located above the sign face. Narrow signs 
and uniquely shaped signs may be illuminated by ground mounted lighting fixtures, 
where approved by the Commission. The lighting intensity shall be the minimum 
necessary to illuminate the sign face; 
 

Page 20 · open in PDF

SECTION 3 
USE DISTRICTS 
 
55 
 
 

Page 21 · open in PDF

SECTION 3 
USE DISTRICTS 
 
56 
 
  
 
 

Page 22 · open in PDF

SECTION 4 
SITE PLANS 
 
57 
  
4.0 PURPOSE 
  
 To protect the character, property values and historic and rural nature of the 
community, and to further the objectives of Section 1.0 of these Regulations, in all 
Zones except the R4A, R2A, R50, and R30, a site plan shall be approved by the 
Commission prior to the issuance of a building permit for any new construction or 
addition or for any change in the footprint of any existing building. No site plan shall 
be changed in any manner without the approval of the Commission. Site plans shall 
be required for all special permit requests, which involve any changes in existing sites 
including sites within the R4A, R2A, R50 and R30 zones. 
  
4.1 SITE DEVELOPMENT PLAN CRITERIA 
  
 The applicant must submit the following material as applicable for approval of a site 
development plan: 
  
4.1.1 Application 
  
 One (1) copy of a completed application form available from the Commission. 
  
4.1.2 Legal Description 
  
 One (1) copy of a legal description of the property on which the development will take 
place. 
  
4.1.3 Site Plan 
  
 Nine (9) copies of a site plan drawn at a scale no smaller than 1 (one) inch = 100 feet 
in accordance with Class A-2 standards as defined by the existing Code of Practice 
for Standards of Accuracy of Surveys and Maps adopted by the Connecticut 
Association of Land Surveyors. The site plan shall show, as applicable, the following: 
  
4.1.3.1
  
Existing and proposed topography shown in two (2) foot contour intervals; 
  
4.1.3.2
  
Existing and proposed roads, streets, driveways and loading and parking areas; 
  
4.1.3.3
  
Existing and proposed walkways and sidewalks; 
  
4.1.3.4
  
Existing and proposed drainage facilities, watercourses and wetlands; 
  
4.1.3.5
  
Existing and proposed utilities; 
  
4.1.3.6
  
Adequate provisions for potable water supply and sewage disposal; 
  
4.1.3.7 Existing and proposed methods of ingress and egress; 
  
4.1.3.8
  
Proposed methods of refuse storage and disposal; 
  

Page 23 · open in PDF

SECTION 4 
SITE PLANS 
 
58 
4.1.3.9
  
Existing and proposed fire hydrants, fire ponds and/or fire alarm boxes; 
  
4.1.3.10 Existing and proposed structures; 
  
4.1.3.11 Existing and proposed buffer strips, earth berms and landscaping; 
  
4.1.3.12 Existing and proposed signs; 
  
4.1.3.13 Exterior illumination showing location, light and type of fixtures; 
  
4.1.3.14 Outside storage and identity of items to be stored outside; 
  
4.1.3.15 Recreational facilities, acres and open space; 
  
4.1.3.16 A data block which gives needed zoning information including where applicable: 
percentage of lot coverage, acreage of the parcel, number and mix of units, required 
parking and number of spaces provided and zoning designation; 
  
4.1.3.17 A key map drawn at a scale of at least one (1) inch = 400 feet showing the locations 
of buildings and facilities on abutting land, driveway entrances on both sides of the 
street or streets within 500 feet of the site and zone boundaries within 500 feet of the 
site; 
  
4.1.3.18 Existing and proposed easements. 
  
4.1.4 Abutters List 
  
 One list of abutters within 200 feet of the site including their current mailing 
addresses. 
  
4.1.5 Architectural Elevations 
  
 Nine (9) copies of the general architectural elevations of the proposed buildings, 
prepared by a registered architect or engineer, drawn to scale and including type and 
color of building materials, exterior facade and facing, fenestration and any special 
architectural features. The location, height, size, dimensions, design, colors, lettering, 
lighting, intensity and appearance of all signs shall also be shown. The Commission 
may waive this requirement for any application for the construction of a building of 
less than 5,000 square feet. 
  
4.2 SITE DEVELOPMENT PLAN SPECIAL REGULATIONS 
  
4.2.1 Mylar Filing and Construction Deadlines 
  
 An approved site plan (mylar copy) shall be signed by the Commission and filed in the 
office of the Town Clerk within ninety (90) days of the Commission’s approval. The 
signed plan shall serve as the “Certificate of Approval”. All work in connection with 
such site plan shall be completed within five years after the approval of the plan. 
Noted on the mylar shall be the date on which such five-year period expires. Failure to 
complete all work within such five-year period shall result in the automatic expiration 
of the approval, except that the Commission may grant one or more extensions of the 
time to complete all or part of the work, provided the total extension or extensions 
shall not exceed ten years from the date such site plan is approved. "Work" for 
purposes of this section means all physical improvements required by the approved 
plan. 

Page 24 · open in PDF

SECTION 4 
SITE PLANS 
 
59 
  
4.2.2 Contiguous Parcels 
  
 For the purpose of integrated development, any number of contiguous parcels may be 
consolidated for the purpose of development and the consolidated parcel shall be 
construed to be one (1) lot when computing building coverage, yard requirements and 
permitted uses, provided: 
  
4.2.2.1 The owners of each lot shall give to the owners of the consolidated parcel by deed, 
easement, or agreement filed in the Office of the Town Clerk, the right of entrance, 
exit, passage, parking and loading; 
  
4.2.2.2 The consolidated parcel is developed with an integrated plan of buildings, parking, 
loading and unloading, and open space; 
  
4.2.2.3 The Commission may require or limit use of access driveways to one or more parcels, 
whether or not under separate ownership, in order to assure safe traffic movement 
onto the street and to avoid congestion. 
  
4.2.3 Sidewalk Requirements 
  
 The developer shall provide concrete sidewalks, four (4) feet wide along the linear 
front footage of all roads abutting the site, in accordance with Commission policy on 
file in the Office of Community Development. 
  
4.2.4 Drainage Requirements and Stormwater Management 
  
 All developments shall be designed in such a way that the peak rate of runoff (in cubic 
feet per second) leaving the site in its developed state (post-development) shall be 
less than or equal to the peak rate of runoff leaving the site prior to development (pre-
development). The Commission may, at the request of the developer, allow an 
increase in the peak rate of runoff leaving the site and the developer may agree to 
contribute to a Granby Downstream Fund established to correct flooding problems or 
potential flooding problems which may arise at a future date, in accordance with 
Commission policy on file in the Office of Community Development. The developer 
shall provide the Commission with a downstream hydrologic/hydraulic analysis with all 
requests for peak runoff increases. 
  
 Proposed drainage systems shall be designed in accordance with current engineering 
practice and shall include best management practices (BMPs) to manage the quantity 
of stormwater and treat the quality of stormwater. Proposed drainage systems shall 
address the following goals: 
  
 A. Preserve the pre-development site hydrology to the greatest extent possible; 
  
 B. Preserve and protect streams, channels, wetlands, water bodies, watercourses 
and other natural features that protect water quality and provide water quality and 
quantity benefits; 
  
 C. Reduce the peak rate of runoff from developed land to minimize increases in 
flooding; 
  
 D. Manage stormwater runoff in a manner that maintains or improves the physical 
and biological characteristics of existing drainage systems, both on-site and off-
site, and prevents increases in downstream flooding, streambank erosion and 
water pollution; 

Page 25 · open in PDF

SECTION 4 
SITE PLANS 
 
60 
  
 E. Emphasize non-structural approaches to controlling runoff and water quality, 
where appropriate; 
  
 F. Prevent pollution of drinking water sources, both above ground and below ground 
(aquifers) by minimizing the discharge of soluble pollutants; 
  
 G. Prevent pollutants from entering receiving waters and wetlands that exceed the 
systems ability to assimilate or treat the pollutants; 
  
  

Page 26 · open in PDF

SECTION 4 
SITE PLANS 
 
61 
 H. Reduce the average total suspended solids (TSS) loadings in the post 
development runoff by at least 80 per cent (80%); 
  
 I. Remove oils, greases and vehicle fluids from the post development runoff, prior 
to the runoff leaving the site; 
  
 J. Incorporate stormwater management practices that mitigate potential increases 
in the temperature of runoff. 
  
 The analysis and design of drainage systems and stormwater management systems 
shall utilize the following publications, at a minimum: 
  
 • State of Connecticut Department of Transportation (CONNDOT) Drainage 
Manual; 
 • U. S. Soil Conservation Service TR-55 Manual; 
 • U. S. Soil Conservation Service TR-20 Manual; 
 • Connecticut Guidelines for Erosion and Sediment Control (2002); 
 • Connecticut Stormwater Quality Manual (2004). 
  
4.2.4.1 Stormwater Management Requirements 
  
 The following stormwater management requirements shall be addressed: 
  
 • All proposed developments shall include an analysis of the upstream tributary 
drainage area and shall include a downstream impact analysis based on the 
post-development conditions; 
  
 • Proposed developments shall attenuate the post-development peak runoff rate to 
no more than the pre-development peak runoff rate, unless otherwise modified 
by the Commission; 
  
 • All drainage/conveyance systems, whether structural or non-structural, shall be 
analyzed, designed and constructed to accommodate existing upstream off-site 
runoff and developed on-site runoff (post-development); 
  
 • Proposed developments shall include provisions for the treatment of surface 
runoff in order to minimize the discharge of pollutants into existing conveyance 
systems, watercourses, water bodies and wetlands; 
  
 • All proposed developments shall include measures to control soil erosion and 
sedimentation during construction and post-development; 
  
 • Maintenance of all proposed drainage systems/facilities not dedicated to the 
Town shall be the sole responsibility of the property owner or property 
association. Maintenance and operation plans/schedules shall be part of any 
approved site plan. 
  
4.2.4.2 Stormwater Quantity 
  
 All stormwater conveyance systems, storm sewer systems, surface drainage systems, 
detention systems, swales, channels, etc. shall be appropriate for the site and shall be 
designed in accordance with current engineering practice. Design storm frequencies 
used in the drainage analysis shall be appropriate for the site and shall be in 
accordance with the requirements of the Town and the CONNDOT Drainage Manual. 
  

Page 27 · open in PDF

SECTION 4 
SITE PLANS 
 
62 
4.2.4.2.1 Peak Runoff Attenuation 
  
 Peak runoff attenuation can be accomplished by limiting impervious coverage, 
increasing travel times, utilizing pervious pavements, introducing groundwater 
recharge, constructing stormwater detention facilities or other approved methods. 
Increases in peak runoff must be attenuated for the 2-year, 10-year, 25-year and 100-
year storm unless otherwise modified by the Commission. Detention systems not 
dedicated to the Town will require an operation and maintenance schedule which 
addresses items of routine maintenance; frequency of maintenance; the party 
responsible for maintenance; and an emergency operation plan. 
  
4.2.4.3 Stormwater Quality 
  
 All site developments shall include provisions for the treatment of stormwater runoff in 
order to minimize the transport of pollutants downstream or into the groundwater. 
These treatment requirements are an important part of the Town’s strategy to comply 
with the National Pollutant Discharge Elimination System (NPDES) Permit Phase II 
Requirements for Post-Construction Runoff Control. 
  
4.2.4.3.1 Stormwater Treatment Procedures 
  
 In general, the procedures for meeting the objectives of post-construction runoff control 
are: 
  
 a. Site Design Best Management Practices (BMPs); 
  
 Site design BMPs are techniques and facilities that can be used within the proposed 
development to reduce the quantity of runoff and treat runoff in order to reduce the 
level of pollutants. Site design techniques include minimizing impervious areas and 
retaining native vegetation. Site design facilities include roof downspout infiltration 
systems, drywells and the utilization of pervious pavement where appropriate. If 
practical, runoff storage and treatment measures shall be spread throughout the site 
rather than being placed at a single stormwater collection point (end-of-pipe 
structure); 
  
 b. Pretreatment Facilities 
  
 Pretreatment of runoff is required prior to discharging to the site’s primary 
stormwater treatment facility or to any infiltration facility. The purpose of 
pretreatment is to remove large particles and debris from runoff in order to prevent 
clogging and minimize maintenance of any downstream treatment facility. 
Appropriate pretreatment facilities include deep sump catch basins, sediment traps, 
grass swales, vegetative buffers, gravel/riprap flow spreaders, underground 
detention systems, oil water separators and proprietary settling devices. Further 
downstream treatment utilizing primary treatment facilities is required after 
pretreatment; 
  
 c. Primary Treatment Facilities 
  
 Primary treatment of stormwater runoff is required at all points where stormwater 
discharges from the site into an existing stormwater conveyance system, 
watercourse, water body or wetland. Primary treatment facilities should be capable 
of capturing and treating the design water quality volume (WQV) or the design water 
quality flow (WQF) in accordance with the design procedures contained in the 
Connecticut Stormwater Quality Manual. Examples of primary treatment facilities 
include infiltration trenches, infiltration basins, rain gardens, bio-filtration swales, 

Page 28 · open in PDF

SECTION 4 
SITE PLANS 
 
63 
surface or underground filtration systems, bio-retention systems and proprietary 
filtration devices. 
  
4.2.5  Landscape Treatment 
  
 The following shall apply to all developments where a Site Plan approval is required: 
  
 a. Where any commercial, industrial or multi-family use abuts a residential zone, a 
twenty-five (25) feet wide landscaped buffer strip shall be provided, on the lot 
used for such commercial, industrial or multifamily use, extending the length of 
the property boundary, seeded and properly planted with trees and shrubs to 
insure a proper break between the two uses. The Commission may waive this 
requirement where the abutting residential zone does not contain a residential 
use; 
  
 b. The site shall contain a minimum landscaped area in the aggregate 20% of the 
total Site; 
  
 c. The site shall contain a landscaped area adjacent to the street which is not less 
than twenty (20) feet wide and extending along the entire linear front footage. 
This landscaped area shall be free of parking areas and planted with deciduous 
and coniferous trees located in clusters at a minimum rate of 1 tree per 25 feet of 
frontage. In addition to the trees, the frontage should include a variety of 
additional vegetation clusters utilizing local species of vegetation such as azalea, 
rhododendron and mountain laurel. The Commission may waive this 
requirement where existing slopes are present or where the developer 
demonstrates an excellence in building placement and landscape design; 
  
 d. Where any commercial, industrial or multi-family use abuts a residential zone, a 
twenty-five (25) feet wide landscaped buffer strip shall be provided extending the 
length of the zone boundary, seeded and properly planted with trees and shrubs 
to insure a proper break between the two uses. The Commission may waive this 
requirement where the abutting residential zone does not contain a residential 
use; 
  
 e. The Commission may require additional landscaping measures under unusual 
conditions or for noise abatement to prevent the depreciation of adjoining 
properties which may include fencing, walls, earth berms, mature plantings or a 
combination of measures; 
  
 f. The Commission may reduce the landscape requirements by not more than 25% 
for excellence in building or open space design. The Commission shall consider, 
among other features, the site characteristics, compatibility of proposed 
structures with surrounding architectural types, quality of building materials and 
the size and quality of landscape materials; 
  
 g. The Commission shall consider, and may require, a Visual Streetscape Buffer 
when reviewing applications for Site Plan or Special Permit. The depth of the 
Streetscape Buffer will vary based on the factors outlined herein, up to a 
maximum depth of 500 feet. The buffer area shall be preserved in a natural 
state, between the street line and new interior development, except as 
necessary to allow access and achieve proper sight line for vehicles exiting 
and/or entering the development. The street or driveway that will provide access 
and egress to the developable portion of the property, by crossing the 
streetscape buffer, shall be landscaped to visually ease the transition from the 
existing road to the proposed development; 

Page 29 · open in PDF

SECTION 4 
SITE PLANS 
 
64 
  
 h. The streetscape buffer shall be permanently preserved through the creation of a 
conservation or similar easement and/or by deeding the fee or easement to an 
approved entity. In determining the applicability of a Streetscape Buffer the 
Commission shall consider the following: 
  
 • The setback of existing developments with the general area of the proposal; 
  
 • The condition of the streetscape within the area of the proposal; 
  
 • The potential to expand the streetscape buffer upon application of future 
developments; 
  
 • The impact that a streetscape buffer will have on the general aesthetics of the 
area; 
  
 • The depth of the property and the effect that such a requirement will have on 
the overall development potential of the site; 
  
 • The feasibility of developing the rear portion of the site; 
  
 • Factors that limit the developable areas of the site such as soils, wetlands 
and slopes; 
  
 • The extent of vegetative cover and the landform within the area of the 
streetscape buffer, before and after development. 
  
 i. Site plans are encouraged to contain native species whenever possible. If a non-
native species is proposed and there is a native species similar in appearance 
and function, preference shall be given to native species. 
  
 j. Cleared areas not being regularly mowed should be seeded with a mix of native 
grasses and pollinator friendly species whenever possible.  
  
4.2.6 Natural Features 
  
 Due regard shall be given to the preservation and potential enhancement of natural 
features, trees, streetscapes, scenic points, rock formations, and other assets of a 
community nature. All watercourses should remain in as natural a state as possible, 
and all land filing shall be subject to the landfill regulations of the Town. The 
developer shall preserve, as far as possible, hardwood and evergreen trees that are 
not required to be removed by the building construction or public improvements. 
  
4.2.7 Bonding Requirements 
  
4.2.7.1 The Commission may require that a bond be posted by the applicant, in an amount and 
form acceptable to the Commission, in order to assure the completion of all work 
required by site the plan for the following: roads, parking areas, drainage systems, 
sanitary sewers, water lines and other public utilities, recreational facilities, landscaping 
and planting, improvements or conditions by the Commission or other Town 
departments. 
  
4.2.7.2 A surety company bond in the amount approved by the Commission must be filed with 
the Town of Granby prior to the issuance of any building permit, except that, in lieu of 

Page 30 · open in PDF

SECTION 4 
SITE PLANS 
 
65 
a bond, there can be deposited with the Town cash or letter of credit in an amount 
sufficient to guarantee the completion of the work required on the plan. 
  
4.2.7.3 In the case of water mains, electric lines or other utilities to be installed by a public 
utility corporation or municipal department, a statement from such corporation or 
department that the work will be done within a reasonable time and at no expense to 
the Town will be accepted in lieu of a bond or cash deposit. 
  
4.2.7.4 A decision on any application; for a release or reduction of any security for completion 
of improvements, utilities and recreation facilities shall be made by the Commission, 
upon the recommendation of the Town Engineer. 
  
4.2.7.5 An application for release and or reduction of security shall be made by letter from the 
developer to the Commission and shall indicate the value of the improvements, public 
utilities or recreation facilities remaining to be completed after the date of such 
application. A reduction in security shall not be less than in increments of 25% of the 
projected costs of the improvements. 
  
4.2.7.6 A reduction of any security for completion will be allowed only if, after the Town 
Engineer's inspection, the remaining security is adequate to cover the estimated cost 
of completion. A release of any security for completion shall not be made until the 
Town Engineer certifies completion of the public utilities, improvements and recreation 
facilities that have been made in accordance with the requirements of the site plan ap-
proved by the Commission. 
  
4.2.8 On Site Sewage Disposal 
  
4.2.8.1 Where individual sanitary sewage disposal systems are proposed, the site plan shall 
be accompanied by a sanitary report, developed in accordance with the guidelines set 
forth by the Farmington Valley Health District. The report shall demonstrate the 
feasibility of the proposed individual systems; the report should deal with the area as 
a whole, discussing the following points: 
  
 a.  General nature and development of the surrounding area; 
  
 b. Topography and natural drainage patterns; 
  
 c. Sub-surface conditions as shown by sub-surface investigation, including soil 
absorption characteristics, ground water level conditions, ledge rock and general 
nature of soil; 
  
 d. General description of the type of development contemplated; 
  
 e. Detailed description of proposed sanitary sewage disposal facilities indicated 
sizes for various ground conditions, materials to be used, and the general layout 
pattern to be used, etc.; 
  
 f. Special precautions that may be necessary to provide proper functioning of the 
proposed disposal systems; 
  
 g. Map of the general area with locations of all tests shown on proposed layout; 
  
 h. Flood heights of any nearby streams, brooks or rivers. 
  
 The report shall contain test results, and an engineering evaluation of test results 
based on an extensive subsurface investigation. 

Page 31 · open in PDF

SECTION 4 
SITE PLANS 
 
66 
  
4.2.8.2 Since the principal purpose of the sanitary report is to demonstrate the feasibility of 
the ground for subsurface disposal of septic tank wastes, emphasis must be placed 
on the analysis and interpretations of test results and other observations by the 
engineer. 
  
  

Page 32 · open in PDF

SECTION 4 
SITE PLANS 
 
67 
4.2.8.3 The report shall contain a statement by the engineer that, in his professional opinion, 
the area is suitable for the installation of individual sanitary sewage disposal systems 
of the general type and size described in his report. Any reservations or special 
conditions considered necessary by the engineer shall be repeated in this portion of 
his report. 
  
4.2.8.4 If any additional information is requested, or if any additional tests are required, a 
supplemental report shall be submitted. The Commission may modify or waive the 
requirements of this Section for the construction of a structure of less than 10,000 
square feet, or for any commercial or industrial building where the amount of water 
use is limited to lavatories and bath facilities. 
  
4.2.9 Design Review 
  
4.2.9.1 Evaluation by the Commission of the appearance of a project shall be based on the 
quality of its architectural design and on its relationship to its surroundings. All 
developments shall take into account the following guidelines: 
  
 a. Buildings shall have good scale and be in harmonious conformance with 
permanent neighboring development; 
  
 b. Materials shall have good architectural character and shall be selected for 
harmony of the building with adjoining buildings; 
  
 c. Materials shall be selected for suitability to the type of buildings and the design in 
which they are used. Buildings shall have the same materials, or those that are 
architecturally harmonious, used for all building walls and other exterior building 
components wholly or partly visible from public ways; 
  
 d. Materials shall be of durable quality; 
  
 e. Building components such as windows, doors, eaves, and parapets shall have 
good proportions and relationships to one another; 
  
 f. Colors shall be harmonious and shall use only compatible accents; 
  
 g. Mechanical equipment or other utility hardware on roof, ground, or buildings shall 
be screened from public view with materials harmonious with the building or they 
shall be so located as not to be visible from any public ways; 
  
 h. Exterior lighting shall be part of the architectural concept. Fixtures, standards, and 
all exposed accessories shall be harmonious with building design; 
  
 i. Refuse and waste-removal areas, service yards, storage yards and exterior work 
areas shall be screened from view from public ways using materials as stated in 
criteria for equipment screening; 
  
 j. Monotony of design in single or multiple building projects shall be avoided. 
Variation of detail, form, and siting shall be used to provide visual interest. In 
multiple building projects, variable siting or individual buildings may be used to 
prevent monotonous appearance. 
  
4.2.10 Stipulations 
  
 The Commission, in approving a Site Development Plan, may stipulate such 
restrictions as appear to the Commission to be reasonable to assure compliance with 

Page 33 · open in PDF

SECTION 4 
SITE PLANS 
 
68 
the intent of these Regulations and to protect or promote the rights of individuals, 
property values and the environment in the area as a whole, the public health, safety 
or welfare, sound planning and zoning principles, improved land use, site planning 
and land development or better overall neighborhood compatibility. Such restrictions 
may concern, without limitation, the components of the site plan and the layout, 
distribution and relationship between uses and structures, vehicular and pedestrian 
circulation, parking, open space, landscaping, screening, signs and lighting. All 
conditions shall be satisfied, if possible, prior to the issuance of a building permit but 
must be complied with completely at the time of issuance of a certificate of 
occupancy. 
  
4.2.11 Waiver of Requirements 
  
 When site plan approval is required as part of a Special Permit application in an R4A, 
R2A, R50 or R30 zone, the Commission may modify or waive the requirements of 
Sections 4.1.3, 4.1.5, 4.2.1, 4.2.3 and 4.2.5. 
  
4.2.12 Preliminary Plans 
  
 Any applicant may prepare a set of preliminary plans for an initial meeting with the 
Commission. The purpose of the meeting shall be to provide an informal opportunity 
for the applicant to avail himself/herself of the advice and assistance of the 
appropriate Town officials before preparation of the final plans and before a formal 
application for Site Development approval is made. 
  
4.2.13 Minor Changes 
  
 When minor changes to approved site development plans are requested which do not 
require additional parking spaces, do not impact on necessary landscaping, do not 
change the visual appearance of the development or which may be required by field 
conditions, approval may be granted by the Community Development Director, 
Building Official and Town Engineer. All approved plans shall be filed with the office of 
Community Development and reported to the Commission at the next meeting. If 
approved, one paper copy of the approved plan must be filed by the applicant. 
  
4.2.14 Simplified Site Plan 
 
When a fully engineered site plan is not necessary to determine inland wetland or 
zoning compliance or when site plan approval is required as part of a Special Permit 
application in an R4A, R2A, R50 or R30 Zone; and proposed changes do not involve 
significant grading, storm drainage, floodplain, underground utilities, or other attributes 
requiring professional design, location, and/or documentation on a site plan; the 
Building Official, Director of Community Development, Town Engineer, Fire Marshal, 
or other applicable staff members may mutually agree to allow a simplified site plan 
that is limited in scope to the vicinity of the proposed change. 
 
Simplified site plans shall be drawn to scale and demonstrate compliance with all 
relevant regulations to the satisfaction of relevant town staff, but do not need to be 
professionally drawn and sealed. Upon subsequent, more significant changes to a 
site, the simplified site plan shall be incorporated into a fully compliant site plan of the 
entire site.  
 
If it is determined a proposal exceeds a simplified site plan, a fully engineered site 
plan shall be required. An applicant may be referred to the Commission for a 
determination at any time.   
 

Page 34 · open in PDF

SECTION 5 
AREA, YARD AND HEIGHT REQUIREMENTS 
 
70 
  
5.0 PURPOSE 
  
 To further the objective of Section 1.1, except as provided for existing lots here within, 
no building shall hereafter be erected, enlarged, altered or rebuilt, or premises used 
except in conformity with these Regulations, and as prescribed in the schedule, which 
is part of this section and is labeled "Schedule of Areas, Yards and Height 
Requirements." 
  
5.1 SCHEDULE OF AREA, YARD, AND HEIGHT REQUIREMENTS 
     
    MINIMUM MINIMUM MINIMUM 
 ZONE   LOT AREA LOT FRONTAGE LOT DEPTH 
     
 R4A    4 ACRES 100 Ft.                       250 Ft. 
 R2A 2 ACRES 200 Ft. 250 Ft. 
 R50 50,000 sq. ft 200 Ft 200 Ft. 
 R30 30,000 sq. ft 150 Ft 150 Ft. 
 PDM 5 ACRES 175 Ft. 250 Ft. 
 C2 20,000 sq. ft 100 Ft. 150 Ft. 
 I 45,000 sq. ft (1)   50 Ft. (1) 200 Ft. (1) 
 ED 10 ACRES (2) 450 Ft. (2) 450 Ft. (2) 
 T1 30,000 sq. ft. 150 Ft. 200 Ft. 
 Commercial Ctr.  20,000 sq. ft 100 Ft. 150 Ft. 
 Ctr. Commons              30,000(9) 150 Ft. 150 Ft. 
 Ctr. Edge              30,000 sq. ft. 150 Ft. 150 Ft 
     
  MAXIMUM MAXIMUM MAXIMUM% 
 ZONE STORIES HEIGHT/FEET LOT COVERAGE 
     
 R4A    2 1/2 30 Ft. 15% 
 R2A 2 1/2 30 Ft. 15% 
 R50 2 1/2 30 Ft. 20% 
 R30 2 1/2 30 Ft. 25% 
 PDM 2 35 Ft. 30% 
 C2 3 45 Ft. 40% 
 I 2 40 Ft. 40% 
 ED 3 60 Ft. 40% 
 T1 2 1/2 30 Ft. 20% (6) 
 Commercial Ctr.  3 45 Ft. 30% 
 Ctr. Commons              3 45 Ft. 30% (8) 
 Ctr. Edge              2 1/2 30 Ft. 25% (9) 
  
  

Page 35 · open in PDF

SECTION 5 
AREA, YARD AND HEIGHT REQUIREMENTS 
 
71 
  
Note*: 
  
In the R4A zone no structure may be constructed within 100 feet of the Case Street 
front street line, or if no street line has been established, within 125 feet of the 
pavement centerline. A minimum 50-foot front yard shall apply to all other existing 
and proposed streets. 
     
 ZONE   MINIMUM MINIMUM MINIMUM 
    FRONT YARD        REAR YARD            SIDE YARD 
 R4A    100/50* Ft. 50 Ft.                       25 Ft. 
 R2A 50 Ft. 50 Ft. 25 Ft. 
 R50 50 Ft. 50 Ft 25 Ft. 
 R30 50 Ft. 30 Ft 20 Ft. 
 PDM 50 Ft. 40 Ft. 35 Ft. 
 C2 50 Ft. (3) 20 Ft. (3) 10 Ft. (3) 
 I 50 Ft. (4) 20 Ft. (4) (3) 20 Ft. (4) (3) 
 ED 50 Ft. (5) 20 Ft. (5) (3) 20 Ft. (5) (3) 
 T1 50 Ft. (7) 30 Ft. 20 Ft. 
 Commercial Ctr.  25 Ft. 20 Ft. 10 Ft. 
 Ctr. Commons              50 Ft. (8) 30 Ft. 20 Ft. 
 Ctr. Edge              50 Ft. (9) 30 Ft. 20 Ft 
  
 (1) See Section 3.8.4.6 
 (2) See Section 3.9.4.2 
 (3) See Section 4.2.5 
 (4) See Section 3.8.4.5 
 (5) See Section 3.9.4.2 
 (6) See Section 3.10.3.5 
 (7) See Section 3.10.3.9 
 (8) See Center Common Zone Special Criteria 3.12.2 
 (9) See Center Edge Special Criteria 3.12.3 
  
5.2 ADDITIONAL LOT LAYOUT/DESIGN REQUIREMENTS 
  
5.2.1 Front Yards on Corner Lots 
  
 On corner lots, the front yard requirement shall be enforced on both street fronts. 
  
5.2.2 Minimum Lot Frontage/Rear Yards 
  
 On a corner lot the minimum lot frontage shall be required along all streets, and a side 
yard line shall be required opposite all street lines. 
  
5.2.3 Height Exceptions 
  
5.2.3.1
  
The provisions of these Regulations limiting the maximum height of buildings shall not 
apply to the height of a church spire; tower or belfry; flagpole; water tank; chimney; 
elevator bulkhead; antenna; or similar use, all of which have a maximum height of 60 
feet. The Commission may permit increases in the height of the above items to a 
maximum of 90 feet following the application and approval of a Special Permit and 
subject to the conditions of Section 8.2.  
  
5.2.3.2
  
The maximum height of any residential building, as provided in Section 5.1, may be 
increased from 30 to 40 feet, and the number of stories may be increased to three 
(3), provided that the minimum building setbacks (front, side, rear yards) are 
increased by 2 feet for every one foot in height above the maximum outlined in 
Section 5.1.  

Page 36 · open in PDF

SECTION 5 
AREA, YARD AND HEIGHT REQUIREMENTS 
 
72 
An A-2 survey, which outlines the reestablished minimum yard requirements, must be 
prepared and filed in the Town Hall Building Office prior to the issuance of a 
Certificate of Occupancy.  
  
5.2.3.3
  
The Commission may approve increases in the height of commercial buildings and 
structures above the maximum outlined in Section 5 of these regulations following the 
issuance of a Special Permit and subject to the conditions of Section 8.2. 
  
5.2.3.3.1 The height shall not exceed 130% of the maximum outlined in Section 5.1 and the 
number of stories may not exceed one additional story. 
  
5.2.3.3.2 The minimum building setback (front, side, rear yards) for any object whose height 
exceeds the maximum outlined in Section 5.1 shall be increased by 2 feet for every 
one foot in height above the maximum outlined in section 5.1. The Site Plan shall 
outline the re-established minimum yard requirements and upon approval shall be 
filed in the Land Records of the Town Clerk. 
  
5.2.3.4
  
No object permitted by this Section 5.2.3 shall have a height greater than the distance 
between it and the nearest property line, it being intended that no such object would 
fall onto an adjacent property. 
  
5.2.4 Through Lots (Or Double Frontage Lots) 
  
 On a through lot the minimum front yard is required on both frontages. All other yards 
shall be considered as side yards. 
  
5.2.5  Lot Frontage Measurement 
  
 The required lot frontage shall be measured between the side lot lines at a distance 
of fifty (50) feet back from and parallel to the street line or where no street line has 
been established, seventy-five feet (75) back from and parallel to the centerline of the 
traveled way. 
  
5.2.6  Accessory Buildings 
  
 All accessory buildings shall conform to the requirements as provided in Section 8.1. 
  
5.2.7 Lot Square 
  
 In the case of subdivision or resubdivision, the shape of all lots shall be such that the 
lot can fit a square having sides equal to the minimum frontage required (for the 
particular zone where subdivision is proposed) minus twenty-five (25) feet, with one 
side of the square placed along the required lot frontage as close to parallel to the 
road as possible. In cases where the front yard has been reduced pursuant to Section 
5.2.9, one side of the square may be placed along the front yard line as close to 
parallel to the road as possible. All lots created within the R4A zone must be designed 
to accommodate a rectangle of no less than 200 feet by 400 feet within the perimeter 
of the lot. 
  
5.2.8 Subdivision Modification 
  
 In the case of subdivision, or resubdivision, of a parcel of land containing a minimum 
of five (5) lots where the shape of the parcel, the topography or other natural features 
prevent the best subdivision in strict conformance to the lot sizes and areas required 
in Section 5.1, such requirements may be modified by the Commission is not over 

Page 37 · open in PDF

SECTION 5 
AREA, YARD AND HEIGHT REQUIREMENTS 
 
73 
20% of the lots in such subdivision, so long as the purpose and intent of Section 5.1 
is carried out for the subdivision as a whole. 
  
5.2.9 Front Yard Requirement 
  
 All buildings shall be set back in accordance with Section 5.1 except that where no 
building line has been established buildings shall be set back seventy-five (75) feet 
from the center line of the road. 
  
 Where new residential subdivisions are approved the Commission may 
 permit a reduction of the 50-foot front yard requirement subject to the 
 following criteria: 
  
 The reduced front yard may not be less than 30 feet; 
  
 The reduced front yard will only be permitted where lots are proposed 
 within new residential subdivisions and where the front yard is measured 
 from a proposed permanent dead-end street which will be constructed as 
 part of the subdivision; 
  
 The reduced front yards shall be shown and noted on the approved 
 mylar copy of the subdivision and filed in the Town Land Records. 
  
5.2.10
  
Lots of Records 
  
 On a lot of less than 150 feet frontage, under separate ownership of record, which lot 
contained an existing building or a building under construction April 29, 1955, and 
which building is hereafter altered or extended, one side yard may be not less than 
10% of the lot frontage, provided the total of both side yards is not less than 30% of 
the lot frontage, and provided that no side yard is less then twelve (12) feet. 
  
5.2.11 Undeveloped Lots of Records 
  
 On a lot less than 150 feet wide, under separate ownership of record on April 29, 
1955, on which no principal building existed or was under construction on April 29, 
1955, one side yard may be not less than 10% of the lot frontage, provided that the 
total of both side yards is not less than 30% of the lot frontage and provided that no 
side yard is less than twelve (12) feet. 
  
5.2.12 Contiguous Developable Area 
  
 All lots created through subdivision or resubdivision shall contain a contiguous 
developable area equal to at least 60,000 in the R4A zone; 40,000 square feet in the 
R2A zone; 35,000 square feet in the R50 zone; and 30,000 square feet in the R30 
zone. For the purpose of this Regulation, a contiguous developable area shall be 
defined as an uninterrupted contiguous area, which does not contain wetlands, 
watercourses, water bodies, ledge outcroppings greater than 20 square feet, or areas 
with slopes in excess of 20% that extend 50 linear feet or more. The contiguous 
developable area may be reduced by 50% when both public water and public sewer 
are available. Where Flexible Residential Development applications are proposed the 
minimum Contiguous Developable Area shall be reduced to 20,000 square feet in the 
R2A zone; 17,500 square feet in the R50 zone; and 15,000 square feet in the R30 
zone. The 50% reduction for public water and public sewer shall not apply to FRD 
applications. 
  

Page 38 · open in PDF

SECTION 8 
SPECIAL REGULATIONS 
99 
  
8.6.15.2.2 The location by street address of the proposed sign; 
  
8.6.15.2.3 A statement of the value of the sign; 
  
8.6.15.2.4 An accurately scaled drawing of the sign; 
  
8.6.15.2.5 A map showing the location of the sign on the site; 
  
8.6.15.2.6   Permit fee of $16 per $1,000 of sign value, rounded up to the nearest $1,000. 
  
8.7 SEDIMENTATION AND EROSION CONTROL 
  
 A soil erosion and sediment control plan shall be submitted with any application for a site 
plan or special permit and for all requests for building permits when the disturbed area of 
such development is cumulatively more than one-half (1/2) acre. In order for the 
development to proceed, the plan must be certified. “Certification” means a signed, written 
approval by the Commission or its designated agent that a soil erosion and sediment control 
plan complies with the applicable requirements of these Regulations. 
  
 To be eligible for certification, a soil erosion and sediment control plan shall contain proper 
provisions to adequately control accelerated erosion and sedimentation and reduce the 
danger from stormwater runoff on the proposed site based on the best available technology. 
Such principles, methods and best practices necessary for certification are found in the 
“Guidelines” and these Regulations. Alternative principles, methods and practices may be 
used only with the approval of the Commission.  
  
8.7.1 Erosion and Sediment Control Plan  
  
 Each erosion and sediment control plan shall be prepared by a registered professional 
engineer and shall contain, but not be limited to the following: 
  
 A narrative describing: 
  
 The type and purpose of the development/construction; 
  
 The schedule for grading and construction activities including: 
  
 • Estimated start and completion dates, which address seasonal concerns; 
 • Sequence of grading and construction activities; 
 • Sequence for installation and/or application of soil erosion and sediment control 
measures; 
 • Sequence for any temporary removal and re-installation of the soil and sediment 
control measures;  
 • Sequence for final stabilization of the site; 
  
 The design criteria for proposed soil erosion and sediment control measures and storm 
water management facilities; 
  
 The construction details for proposed soil erosion and sediment control measures and storm 
water management facilities; 
  
 The installation and/or application procedures for proposed soil erosion and sediment 
control measures and storm water management facilities; 
  

Page 39 · open in PDF

SECTION 8 
SPECIAL REGULATIONS 
101 
 The operations and maintenance program for proposed soil erosion and sediment control 
measures and storm water management facilities. 
  
8.7.2.1.1  A site plan drawn at a scale of 1” = 40’, at a minimum, (Sheet size of 24” x 36”) in 
accordance with Class A-2 standards as defined by the existing Code of Practice for 
Standards of Accuracy of Surveys and Maps adopted by the Connecticut Association of 
Land Surveyors to show the following: 
  
 • The location of the proposed development and adjacent properties; 
  
 • The boundaries of the property; 
  
 • The existing and proposed topography including soil types, wetlands, watercourses and 
water bodies; 
  
 • The existing structures on the project site, if any; 
  
 • The proposed area alterations including cleared, excavated, filled or graded areas and 
proposed structures, utilities, roads and, if applicable, new property lines and proposed 
easements; 
  
 • The location of and design details for all proposed soil erosion and sediment control 
measures and storm water management facilities; 
  
 • The sequence of grading and construction activities; 
  
 • The sequence for installation and/or application of soil erosion and sediment control 
measures; 
  
 • The sequence for final stabilization of the development site; and 
  
  

Page 40 · open in PDF

SECTION 8 
SPECIAL REGULATIONS 
102 
8.7.3 The soil erosion and sediment control plan shall contain any other information deemed 
necessary and appropriate by the applicant or requested by the Commission or its 
designated agent. The designated agent is the Town Engineer or the Zoning Enforcement 
Officer. Erosion and sediment control plans shall contain the following certification signature 
blocks, as applicable: 
  
 “I hereby certify that this plan is in compliance with the Town of Granby Soil Erosion and 
Sediment Control Regulations and the Connecticut Guidelines for Soil Erosion and 
Sediment Control dated 2002, as amended.” 
  
 (Signature)_______________________________, (Date of Approval) ________________   
  
 (Name)_________________________________, (P.E. Registration) ________________   
  
 “The Planning and Zoning Commission of the Town of Granby certifies that this Soil Erosion 
and Sediment Control Plan complies with the Town’s Soil Erosion and Sediment Control 
Regulations and the Connecticut Guidelines for Soil Erosion and Sediment Control dated 
2002, as amended.” 
  
 (Signature)_______________________________, (Date of Approval) ________________   
  
 “The Town Engineer or Zoning Enforcement Officer of the Town of Granby certifies that this 
Soil Erosion and Sediment Control Plan complies with the Town’s Soil Erosion and 
Sediment Control Regulations and the Connecticut Guidelines for Soil Erosion and 
Sediment Control dated 2002, as amended.” 
  
 (Signature)_______________________________, (Date of Approval) ________________   
  
8.7.4 Minimum Acceptable Standards 
  
8.7.4.1 Plans for soil erosion and sediment control shall be developed in accordance with these 
Regulations using the principles as outlined in the Connecticut Guidelines for Soil Erosion 
and Sediment Control (2002), as amended. Soil erosion and sediment control plans shall 
result in a development that minimizes erosion and sedimentation during construction; is 
stabilized and protected from erosion when completed and does not cause off-site erosion 
and/or sedimentation. 
  
8.7.4.2 The minimum standards for individual measures are those contained in the Connecticut 
Guidelines for Soil Erosion and Sediment Control (2002), as amended. The Planning and 
Zoning Commission or the Hartford County Soil and Water Conservation District may grant 
exceptions when requested by the applicant if technically sound reasons are presented. 
  
8.7.4.3 Computations for runoff shall be in accordance with the Connecticut Guidelines for Soil 
Erosion and Sediment Control (2002), as amended; the CONNDOT Drainage Manual 
(2002), as amended, or other generally accepted engineering standards. 
  
8.7.5 Issuance or Denial of Certification 
  
8.7.5.1 For Site Plan and Special Permit Applications, the Commission shall either certify that the 
soil erosion and sediment control plan, as filed, complies with the requirements and 
objectives of this Regulation or deny certification when the development proposal does not 
comply with these Regulations. Certification will normally occur together with the 
Commission’s final action on the application. 
  
  

Page 41 · open in PDF

SECTION 8 
SPECIAL REGULATIONS 
103 
8.7.5.2 For Building Permit Applications, the Zoning Enforcement Officer or Town Engineer shall 
either certify that the soil erosion and sediment control plan, as filed, complies with the 
requirements and objectives of this Regulation or deny certification when the development 
proposal does not comply with these Regulations. Certification will normally occur together 
with the issuance of the building permit. 
  
8.7.5.3 Nothing in these Regulations shall be construed as extending the time limits for the approval 
of any application under Chapters 124 of the Connecticut General Statutes, as amended. 
  
8.7.5.4 Prior to certification, any plan submitted to the municipality may be reviewed by the County 
Soil and Water Conservation District; which may make recommendations concerning such 
plan, provided such review shall be completed within thirty (30) days of the receipt of such 
plan. 
  
8.7.6 Conditions Relating to Soil Erosion and Sediment Control 
  
8.7.6.1 For Site Plan and Special Permit Applications, the estimated costs of measures required to 
control soil erosion and sedimentation, as specified in the certified plan, may be covered in a 
bond or other assurance acceptable to the Commission in accordance with the provisions 
specified within these Regulations. 
  
8.7.6.2 Site development, preparation and or construction shall not begin unless the soil erosion 
and sediment control plan is certified.  
  
8.7.6.3 Excavation, soil disturbance and the removal of vegetation may only begin in accordance 
with the installation of the planned soil erosion and sediment control measures and facilities 
as outlined within the certified plan. 
  
8.7.6.4 All control measures and facilities shall be maintained in effective condition to ensure the 
compliance of the certified plan. 
  
8.7.6.5 It is the developer’s/builders responsibility to correct erosion or sedimentation problems in 
the field and take appropriate measures to avoid such problems. In the event that the 
erosion and sediment control measures, as shown on the certified plan, are not functioning 
to prevent erosion and sedimentation, either through inadequate design, emergency 
conditions, or unforeseen field conditions, the Planning and Zoning Commission or its 
designated agent shall direct the developer to revise the plan to correct and/or eliminate any 
deficiencies in the plan, and to install and maintain new erosion control measures. The 
developer shall promptly comply with any directives of the Commission, or its designated 
agent. 
  
8.7.6.6 In the event that the developer/builder wants to make changes to the certified plan, the 
developer shall submit a revised plan to the Commission or its designated agent. The 
Commission, or its designated agent shall review the revised plan and either certify or deny 
the revised plan in accordance with these regulations. 
  
8.7.6.7 The Commission, or its designated agent, shall have the authority to order and/or approve 
changes to the certified plan in the event of unforeseen field conditions which require 
immediate remedial measures to improve the effectiveness of the certified plan. 
  
8.7.6.8 In the event that a developer/builder fails to perform the work within the time limits specified 
in the certified plan or fails to perform any work in accordance with the certified plan, the 
Commission or its designated agent shall advise the developer in writing of this fact and 
direct that any necessary work be completed within a specified time. If the developer does 
not comply with the directions of the Commission, or its designated agent, the Commission 
may arrange for said work to be done by the Town, or by a private contractor, hired by the 

Page 42 · open in PDF

SECTION 8 
SPECIAL REGULATIONS 
104 
Town. The cost of this work shall be paid for with the bond funds that were deposited by the 
developer and held by the Town. 
  
8.7.6.9.1  Should an emergency situation arise, due to extreme weather or the failure or inadequacy of 
the erosion and sedimentation measures, the Town is authorized to take immediate action 
to address the situation. The cost of this work shall be paid for with the bond funds that were 
deposited by the developer and held by the Town. Should the developer’s bond funds be 
insufficient to cover the cost of work performed by the Town or by a private contractor, hired 
by the Town, under Section 8.7.6.8, 8.7.6.9 or 8.7.7, the developer\property owner shall be 
obligated to reimburse the Town for the expenses. In such cases a final Certificate of 
Occupancy shall be withheld until such time that the Town is reimbursed for its costs. 
  
8.7.7 Building Permits and Bonds 
  
 All applications for building permit must include a cash bond of $1,000 or 10% of the cost of 
the building permit, whichever is greater, for erosion and sedimentation control, when the 
disturbed area of the development is cumulatively more than one-half (1/2) acre. This bond 
may not be required where the Town is currently holding adequate bond funds for approved 
Site Plan and Special Permit applications as outlined herein. 
  
 Should the Commission or its designated agent determine that an area of a construction 
site, which appears to be cumulatively more than one-half (1/2) acre has been disturbed, 
construction activities may be immediately halted until such time that a certified erosion 
control plan is approved and installed in accordance with these regulations.  
  
8.7.8 Inspection 
  
 Inspections shall be made by the designated agent during development to ensure 
compliance with the certified plan and to ensure that control measures and facilities are 
performing properly. The Commission, or its designated agent, may require the developer to 
submit progress reports to verify that the soil erosion and sediment control measures have 
been installed properly and that they are being operated and maintained in accordance with 
the certified plan. If progress reports are required, they shall correspond to the 
construction/installation sequence of the certified plan.  
  
8.7.9  Agreement 
  
 An agreement permitting the Town or its agent to enter onto the property to make 
inspections, emergency repairs, corrections or installations (on forms provided by the Town) 
shall accompany all bonds.  
  
8.8 CUSTOMARY HOME OCCUPATION 
  
 Customary home occupations permitted in Sections 3.1, 3.2 and 3.3 shall be subject to the 
following provisions: 
  
8.8.1 A customary home occupation shall be carried on entirely within the dwelling unit excepting 
agricultural, instructional and educational activities, which may be permitted outside. The 
home occupation may be permitted within an enclosed accessory building, upon issuance of 
a Special Permit by the Planning and Zoning Commission; 
  
8.8.2 A customary home occupation shall be carried on by the inhabitants of such dwelling unit 
and shall only involve the employment on the premises of any member of the immediate 
family residing in such dwelling unit plus one (1) person, full or part-time, not residing in 
such dwelling unit; 
  

Page 43 · open in PDF

SECTION 8 
SPECIAL REGULATIONS 
179 
 8.29.3.10 Signage, if any, shall be limited to four (4) square feet at the base of the facility or 
at the access gate. 
  
 8.29.3.11 An unused wind facility shall be removed within twelve (12) months of cessation of 
operations. 
  
 8.29.3.12 For the purpose of determining the potential for wind energy on a site, wind 
monitoring and meteorological towers shall be permitted as temporary structures for one 
year provided that Town staff determines the equipment will not create a nuisance or 
hazard. A building permit and other information as requested by Town Staff are required 
prior to installation. 
  
 8.29.3.13 To evaluate the proposed site for a wind facility, the Commission may require 
balloon tests, photo simulations, and other studies in connection with any application. 
  
 8.29.3.14 When considering the Special Permit, the Commission may consider anticipated 
noise generation and its effect on surrounding properties and the physical impact on 
surrounding properties. A site plan showing the location of the proposed system and any 
other information as required per Section 8.29.3.13 shall be submitted with the Special 
Permit application. 
  
8.30 Temporary and Limited Moratorium on Cannabis Establishments 
  
 Statement of Purpose. This section has been adopted to provide the Commission with 
the time necessary to consider adoption of potential changes to the Zoning Regulations 
pursuant to Section 8-2 of the Connecticut General Statutes. 
The Connecticut General Assembly has passed, and the Governor has signed S.B. 1201, 
An Act Concerning Responsible and Equitable Regulation of Adult-Use Cannabis (the 
“Act”), portions of which are effective on July 1, 2021. Said Act contains provisions 
allowing municipalities to prohibit or place certain restrictions on cannabis establishments 
with the exception of existing dispensary facilities and producers for medical marijuana as 
defined in Chapter 420f, C.G.S., Palliative Use of Marijuana – legislation passed in 2012 
authorizing the use of medical marijuana. This temporary and limited term moratorium has 
been adopted to provide the Town with the time necessary to develop regulations for 
cannabis establishments that meet statutory responsibilities and promote the public’s 
general health, safety and welfare. 
  
8.30.1 Definitions 
  
 a. Cannabis. Marijuana as defined in Section 21a-240, C.G.S. 
  
 b. Cannabis Establishment. Producer, dispensary facility, cultivator, micro-cultivator, 
retailer, hybrid retailer, food and beverage manufacturer, product manufacturer, 
product packager and or delivery service. 
  
 c. Cultivator. A person that is licensed to engage in the cultivation, growing and 
propagation of the cannabis plant at an establishment with not less than fifteen 
thousand square feet of grow space. 
  
 d. Delivery Service. A person that is licensed to deliver cannabis from (A) micro-
cultivators, retailers and hybrid retailers to consumers and research program 
subjects, and (B) hybrid retailers and dispensary facilities to qualifying patients, 
caregivers and research program subjects, as defined in Section 21a-408, C.G.S., or 
to hospices or other inpatient care facilities licensed by the Department of Public 
Health pursuant to Chapter 368v, C.G.S. that have a protocol for the handling and 

Page 44 · open in PDF

SECTION 8 
SPECIAL REGULATIONS 
180 
distribution of cannabis that has been approved by the department, or a combination 
thereof. 
  
 e. Dispensary Facility. Means a place of business where cannabis may be dispensed, 
sold or distributed in accordance with Chapter 420f, C.G.S. and any regulations 
adopted thereunder, to qualifying patients and caregivers, and to which the 
department has issued a dispensary facility license under Chapter 420f, C.G.S. and 
any regulations adopted thereunder. 
  
 f. Food and Beverage Manufacturer. A person that is licensed to own and operate a 
place of business that acquires cannabis and creates food and beverages. 
  
 g. Hybrid Retailer. A person that is licensed to purchase cannabis and sell cannabis 
and medical marijuana products. 
  
 h. Micro-cultivator. A person licensed to engage in the cultivation, growing and 
propagation of the cannabis plant at an establishment containing not less than two 
thousand square feet and not more than ten thousand square feet of grow space, 
prior to any expansion authorized by the commissioner. 
  
 i. Person. An individual, partnership, limited liability company, society, association, joint 
stock company, corporation, estate, receiver, trustee, assignee, referee or any other 
legal entity and any other person acting in a fiduciary or representative capacity, 
whether appointed by a court or otherwise, and any combination thereof. 
  
 j. Product Manufacturer. A person, excluding a producer, that is licensed to obtain 
cannabis, extract and manufacture products exclusive to such license type and who 
may sell or transfer cannabis and cannabis products to laboratories, research 
programs and cannabis establishments. 
  
 k. Product Packager. A person that is licensed to package and label cannabis and 
cannabis products. 
  
 l. Retailer. A person, excluding a dispensary facility that is licensed to purchase 
cannabis and cannabis products from producers, cultivators, product manufacturers 
and food and beverage manufacturers and to sell cannabis and cannabis products to 
consumers and research programs. 
  
 
 m. Transporter. Means a person licensed to transport cannabis between cannabis 
establishments, laboratories and research programs. 
  
8.30.2 Applicability. 
  
 During this temporary and limited-term moratorium, cannabis establishments shall be 
prohibited in the Town of Granby, and any and all applications submitted for the approval of 
any cannabis establishment shall be denied by the Planning and Zoning Commission or 
Zoning Enforcement Officer, as may be appropriate. 
  
8.30.3 Effective Date/Term. 
  
 This temporary and limited moratorium shall become effective on August 31, 2021 and shall 
remain in effect until August 31, 2023. 
  
  
  

Page 45 · open in PDF

SECTION 8 
SPECIAL REGULATIONS 
181 
8.30 Transit Community Middle Housing Development 
  
 Transit Community Middle Housing Development shall comply with the following standards:  
  
8.30.1 Roof Design 
  
8.30.1.1 The roof shall have a pitch of 4/12 or greater and may include gambrel or hip roof designs. 
Flat roofs are prohibited.  
 
Questions: Specify mansard roof would be allowed? What about federal style buildings with 
flat or nearly-flat roofs? See attachment. 
  
8.30.1.2 Roofs shall be surfaced with shingles or standing-seam metal. Tarpaper roofing shall be 
prohibited. 
  
8.30.1.3 All roofs shall project beyond the wall of the line below them by at least one (1) foot. 
  
 Other possible sub-section: Each roof shall have at least two (2) gables, shed dormers, or 
similar features, which features shall include a window or ventilation louvre. 
 
Question: Does the Commission think this should be added? 
  
8.30.2 Wall and Exterior Design 
  
8.30.2.1 No wall on the street facing façade shall be longer than thirty (30) feet measured at the 
foundation, without a horizontal break in plane at least 2 feet in depth. 
 
Note: PDM caps it at 50 feet before a horizontal offset. It does not specify the offset. 
See attachment for existing horizontal plane. 
 
  
8.30.2.2 Wall surfaces shall be brick, stone, clapboard siding (wood or faux material), shingle (wood 
or faux material), or board-and-batten. EIFS, plywood, stucco, or panelized surfaces shall be 
prohibited; concrete (painted or nonpainted) shall be prohibited except for exposed 
foundations of no more than three (3) feet in height. 
  
8.30.2.3 All buildings shall include window trim and details that conform to the following: 
  
 8.30.2.3.1 Trim width shall have a minimum of three (3) inches measured from the edge of the window 
frame to the outer edge of the trim.  
  
 8.30.2.3.2  Shutters shall be on all windows on the street facing façade. 
  
 8.30.2.3.3 Windows shall include dividers, and shall be designed as 6 over 6, 6 over 1, or 4 
over 4. 
  
 8.30.2.3.4  A minimum of fifteen (15) percent of the front façade must be windows. 
  
 Question: Require a covered stoop? 
 
If so, possible sub-section: 
Each building shall have a covered stoop at least five feet in width and a minimum depth of 4 
feet.   
 
 

Page 46 · open in PDF

SECTION 8 
SPECIAL REGULATIONS 
182 
8.30.3 Buildings shall conform to the height, yard, and other bulk requirements of the underlying 
zoning district in Section 5, unless a perfect six development is proposed, in which case the 
maximum stories permitted shall be three (3) and the maximum height shall be forty-five (45) 
feet. 
  
8.30.4 Landscaping 
  
8.30.4.1 Each building shall include foundation plantings that conform to the following: 
  
 8.30.4.1.1 At least six (6) shrubs per twelve (12) lineal feet of wall length, except at stairways, 
handicapped ramps, or access walkways. 
 
Questions: Around entire building? Or front façade only? 
 
Is spacing too close? Will vary depending on species. Place 5 feet on center? 
 
  
 8.30.4.1.2 Shrubs shall include at least seventy-five (75) percent evergreens.  
  
 8.30.4.1.3 All shrubs shall be at least one (1) gallon size at time of planting. 
  
8.30.4.2 Each property shall include trees that conform to the following: 
  
 8.30.4.2.1 At least two (2) trees shall be planted within the front yard of each lot. The front 
yard is the area between the building and the street. 
  
 8.30.4.2.2 Deciduous trees shall have a minimum caliper of three and one-half (3 ½) inches 
and evergreen trees shall be at least six (6) feet in height at time of planting. 
  
8.30.4.3 All unpaved ground areas shall be landscaped with grass or groundcover. Gravel, pea-stone, 
or mulch shall not be permitted except within tree or shrub planting beds. 
  
8.30.4.4 Each property shall include landscape buffers that conform to the following: 
  
 8.30.4.4.1 Where the property abuts a residential zone with a residential use, a twenty-five 
(25) foot landscaped buffer extending the length of the property boundary with the abutting 
residential zone shall be provided. A minimum of one (1) deciduous tree with a minimum 
caliper of three and one-half (3 1/2) inches or one (1) evergreen tree with a minimum height 
of six (6) feet at the time of planting shall be planted per twenty-five (25) feet of property line. 
There shall also be a minimum of five (5) shrubs at least one (1) gallon size at time of planting 
per twenty-five (25) feet of property line. Plant materials shall be staggered in rows to create 
an effective year-round visual screen. At least 50% of required plantings shall be evergreen 
species. A six (6) foot stockade fence may be installed within the buffer area to enhance 
screening. Where a fence is installed, the required number of trees and the required number 
of shrubs may each be reduced by up to twenty-five (25) percent. No structure, parking areas, 
storage, or impervious surfaces shall be permitted within the required buffer, except for 
approved fencing and utilities that do not interfere with the buffer’s function. 
  
 8.30.4.4.2  The property shall contain a landscaped area adjacent to the street which is not 
less than twenty (20) feet wide and extending the length of the property frontage. This 
landscaped area shall be free of parking areas, with the exception of driveway access and an 
area for a sign, and shall be planted with deciduous and evergreen trees located in clusters 
at a minimum rate of one (1) tree per twenty-five (25) feet of frontage. A deciduous tree must 
have a minimum caliper of three and one-half (3 ½) inches and an evergreen tree shall be at 
least six (6) feet in height at time of planting. These trees are in addition to those required 
under Section 8.30.4.2. In addition to the tree(s), vegetation clusters including azalea, 

Page 47 · open in PDF

SECTION 8 
SPECIAL REGULATIONS 
183 
rhododendron, mountain laurel, and other native species shall be planted. These plants shall 
be at least one (1) gallon in size at planting. There shall be at least one (1) vegetation cluster 
with a minimum of three (3) plants per twenty-five (25) feet of frontage. 
8.30.4.5 All trees and shrubs shall be native species. 
8.30.4.6 All trees and shrubs shall be guaranteed for one (1) year after planting. 
8.30.5 Parking 
8.30.5.1 Parking spaces and circulation driveways shall not be located within twenty (20) feet of the 
front property line or within fifteen (15) feet of the side property line or within ten (10) feet of 
the rear property line, except where there is a legal easement or other document for shared 
parking, then parking areas may be paved to the common property line. 
8.30.5.2 Parking shall be so designed that no parking is provided, and no parking will be permitted, on 
roadways or driveways giving access from a public street to interior lot parking spaces. 
8.30.5.3 To reduce visual and audio impacts and the impact of heat, excessive drainage and snow 
removal, deciduous trees shall be planted at a rate of one (1) two (2) inch caliper tree per 
fifteen (15) parking spaces; and parking areas shall be grouped in clusters of thirty (30) spaces 
or less, separated by landscaped islands. 
8.30.5.4 Each parking space shall have an area of not less than nine (9) feet by eighteen (18) feet. No 
area shall be credited as parking space if it is used as a loading space. All parking spaces 
shall be permanently marked to delineate individual parking spaces. 
8.30.5.5 Aisles for accessing parking stalls shall be at least twenty-four (24) feet wide for double-loaded 
parking bays and at least twenty-two (22) feet wide for single- loaded bays. A forty-five degree 
parking stall will be required a fourteen (14) foot aisle width. 
8.30.5.6 Access driveways, which are driveways from a public street to the interior parking lot, shall be 
a minimum of 24 feet in width for two-way traffic and a maximum of 30 feet, and a minimum of 12-feet in width for one-way 
traffic and a maximum of 15 feet. Driveways shall be designed to be as perpendicaular to the street as possible. 
8.30.5.7 All parking spaces, loading facilities, and access roadways shall have at least six (6) inches 
of processed stone and two and one-half (2 1/2) inches of bituminous concrete as surface 
treatment. 
8.30.6 Lighting 
8.30.6.1 All light fixtures shall be full-cutoff, dark-sky compliant. 
8.30.6.2 There shall be no light trespass or light spill from the property onto adjacent properties. 
8.30.6.3 Building-mounted floodlights are prohibited. 
8.30.6.4 The maximum height of light poles is fourteen (14) feet. 
8.30.6.5 Foundations for light poles shall not exceed six (6) inches above the surrounding grade. 
8.30.6.4 There shall be no light trespass or light spill from the property onto adjacent properties. 
8.30.7 Signs shall conform to the requirements of the underlying zone. 

Page 48 · open in PDF

SECTION 8 
SPECIAL REGULATIONS 
184 
8.30.8 Concrete sidewalks at least five (5) feet in width shall be provided along the linear frontage of 
all roads abutting the property. 
Question: This is consistent with Granby Center area. What about other areas? 
8.30.9 Concrete sidewalks at least five (5) feet in width, which lead from the existing street to the 
proposed or re-used structure, shall be provided. 
8.30.10 Rooftop mechanical units shall be set back from the leading edge of the roof and/or screened 
using a parapet wall or other architectural screening, so as not to be visible from the street 
when viewed while standing at ground level. 
8.30.11 Ground mounted mechanical equipment and refuse storage areas (trash and recycling 
dumpsters and compactors) shall not be visible from the street when viewed while standing 
at ground level. Such mechanical equipment and refuse areas shall be screened with 
evergreen hedges; wood or vinyl stockade fences; masonry walls; or any combination. 
Question: What about view from adjacent properties? 
8.30.12 The site shall comply with Section 4 Site Plan Criteria. The requirements of Section 8.30 shall 
take precedence over any conflicting requirements. 
8.30.13 The site shall comply with Section 8.7 Sedimentation and Erosion Control. 
8.30.14 The site shall comply with Section 9 Earth Excavation. 
8.30.15 The conversion of existing buildings shall be permitted provided any site or building changes 
comply with the provisions of Section 8.30. 
Other questions/consult with Town Attorney:
Include reference to Aquifer Protection Overlay Regulations--can special permit be required
if in the overlay zone?
Include reference to the SFHA Section 8.18?

Page 49 · open in PDF

SECTION 9 
EARTH EXCAVATION, FILLING AND GRADING 
185 
 
9.0 PURPOSE 
  
 The purpose of this Section to regulate the excavation and removal of sand, gravel, 
stone, loam, dirt and other such earth materials and to regulate the hauling and 
depositing of earth materials onto properties within the Town of Granby. Such 
regulation is necessary to minimize situations that may have a negative impact on the 
Town and surrounding properties, while the activity is occurring and following its 
completion. Further, these regulations are designed to assure that the final grades are 
stable and blend naturally into the surrounding area and to assure that the land 
remains suitable for appropriate future uses, while reducing traffic hazards and 
nuisances often associated with the excavation, filling and hauling of earth products. 
  
9.1 APPLICABILITY 
  
 This Section 9 is applicable to all properties within the Town of Granby, regardless of 
zone.  
  
9.2 SCOPE 
  
 The cubic yards of material specified below are cumulative from the date of adoption 
of the regulation. 
  
9.3 Permitted without a permit: 
  
9.3.1 On a lot of less than 1 acre, the excavation of earth or the filling of land is permitted 
without a permit provided that no more than 150 cubic yards of earth are placed on or 
removed from the lot.  
  
9.3.2 On a lot of 1 acre or more, the excavation of earth or the filling of land is permitted 
without a permit provided that no more than 300 cubic yards of earth are placed on or 
removed from the lot.  
  
9.4 Permitted following the issuance of a Zoning Permit: 
  
9.4.1 A zoning permit, issued by the Zoning Enforcement Officer, is required for any 
excavation or filling of land in excess of that permitted within Sections 9.3.1 and 9.3.2 
above, to a maximum of 5,000 cubic yards. 
  
9.4.2 The application for a zoning permit shall include a plan designed to the satisfaction of 
the Zoning Enforcement Officer and as required herein. 
  
9.5 Permitted following the issuance of a Special Permit: 
  
 The excavation of earth or the filling of land is permitted only upon the issuance of a 
Special Permit by the Planning and Zoning Commission where more than 5,000 cubic 
yards of earth are to be placed on or removed from any lot, except as provided below.  
  
9.6 Permitted following the issuance of a Building Permit: 
  
 The excavation of earth or the filling of land is permitted upon the issuance of a 
Building Permit for a residential home provided that no more than 7,000 cubic yards 
are placed or removed per any one lot. 
  
9.7 Permitted following the issuance of a Septic System Installation or Repair 
Permit by the Farmington Valley Health District: 

Page 50 · open in PDF

SECTION 9 
EARTH EXCAVATION, FILLING AND GRADING 
186 
  
 The excavation of earth or the filling of land is permitted upon the issuance of a permit 
by the FVHD for septic system installation provided that no more than 3,000 cubic 
yards of earth are placed or removed per any one lot. 
  
9.8 Plan Requirements: 
  
 Any plan involving the deposition or removal of more than 2000 cubic yards, or any 
plan which proposes that more than 500 cubic yards of material will be placed or 
excavated from any land area containing less than one acre, will require a plan 
prepared by a PE or LA. 
  
9.9 Exemption where the Commission has approved Subdivision, Special Permit or 
Site Plan Applications: 
  
 A separate Excavation and Removal Special Permit application shall not be required 
where the activity is part of the approval of a Subdivision, Special Permit or Site Plan 
Application. The Commission may require the separate submission of a separate 
Excavation and Removal Special Permit application where the amount of material 
exceeds 30,000 cubic yards or where the Commission determines that the proposed 
Excavation and Removal is the primary part of the Subdivision, or site plan 
application. Additionally, the Commission may permit the temporary use of earth 
material processing, screening or crushing equipment in conjunction with an approved 
subdivision, provided a specific time limit is established for such use. 
  
9.10 Exemption where the Inland Wetlands and Watercourses Commission has 
approved the construction or maintenance of a Pond: 
  
 A separate Excavation and Removal Special Permit application shall not be required 
where the Inland Wetlands and Watercourses Commission has approved the 
construction of a new pond or dredging or modification of an existing pond, provided 
that the total amount of material does not exceed 7,000 cubic yards, or if the material 
does not leave the site. 
 
 APPLICATION REQUIREMENTS 
  
9.11 Plans which detail the proposed activity shall contain all applicable information as 
outlined in Section 4.0 of these Zoning Regulations. The Commission may require 
additional information based on the scope, location or special concerns related to the 
proposal. 
  
9.12 Special Criteria for Earth Excavation, Filing and Grading 
  
 The Building Official, Zoning Enforcement Officer or Planning and Zoning Commission 
shall approve the plan and grant the permit only when satisfied that the following 
conditions are understood by the applicant and that they will be complied with in the 
undertaking of such excavation or filling: 
  
 a. That the premises will be excavated and graded in conformity with the plan as 
approved. 
  
 b. That Sedimentation and Erosion Control will be designed and installed in 
accordance with Section 8.7 of these Zoning Regulations.  
  
 c. That no excavation or filling will take place within 25 feet of any property line 
without the written consent of the abutting land owner(s). The Commission or 

Page 51 · open in PDF

SECTION 9 
EARTH EXCAVATION, FILLING AND GRADING 
187 
Zoning Enforcement Officer may increase this distance to not more than 50 feet 
based on specific site conditions, proposed slope, location of surrounding 
structures and need for additional buffering. 
  
 d. That the existing top soil will remain on site as necessary for the restoration of the 
property upon completion. 
  
 e. That the premises will be excavated and graded in conformity with the plan as 
approved. 
  
 f. That all stages of operations, proper drainage will be provided to prevent the 
collection and stagnation of water and to prevent harmful effects upon 
surrounding properties. 
  
 g. That during the period of excavation and removal, barricades or fences will be 
erected as are deemed necessary by the Zoning Enforcement Officer for the 
protection of pedestrians and vehicles. 
  
 h. That truck access to and from the site will be so arranged as to minimize danger 
to traffic and nuisance to surrounding properties and that any access road used to 
service the operation will be provided with a dustless surface. 
  
 i. That feasible and prudent measure will be taken to minimize the nuisance of 
noise and dust. Upon review of the application the ZEO may require specific 
measures necessary to reduce the anticipated level of noise and dust. Upon 
inspection of the operation, the ZEO may also require further measures to reduce 
the level of noise and dust. Such noise measures may include limiting the use of 
engine braking assist systems such as “jake brakes”, adjusting the work areas 
during certain periods of the day, modifying work practices to limit back-up 
alarms, delaying the clearing of vegetation, requiring the creation of temporary 
earthen berms and other such measures as determined by the ZEO. Measures to 
control dust may include the regular watering of the site or specific areas of the 
site, the application of chlorides; the mulching of exposed areas; adjusting the 
scheduled clearing and grubbing; prioritizing the replanting of vegetation; early 
hydro-seeding and other such measures as determined by the ZEO. 
  
 j. That upon completion, the excavated or filled area will be graded so that no 
gradients in disturbed earth shall be steeper than a slope of 3-1 
(horizontal/vertical), unless, after review by the Town Engineer it is determined 
that the soil condition can support a slope up to 2-1 (horizontal/vertical) and it is 
further determined that such slope is appropriate for the area. 
  
 k. That a layer of topsoil of a quality and depth approved by the Town Engineer will 
be spread over the disturbed area, except exposed rock surfaces, in accordance 
with the approved contour plan. The depth of the top soil shall not be less than 4 
inches and the area shall be seeded with a perennial rye or other approved grass 
and maintained until the area is stabilized. 
  
 l. That there will be no earth material processing, screening or crushing equipment 
on the site, except as outlined in Section 9.9 and as allowed within an Industrial 
zone. 
  
 m. That where an application for excavation or filling involves adjoining properties, 
the properties may be considered under a single application. 
  

Page 52 · open in PDF

SECTION 9 
EARTH EXCAVATION, FILLING AND GRADING 
188 
 n. That activity shall not commence before 7:00 am and shall terminate not later 
than 6:00 p.m.  
  
 o. That no operations are permitted on Sundays or established federal holidays. 
  
 p. That a bond may be required to assure proper completion of the project and 
guarantee the replacement, improvement or repair of the Town infrastructure 
which may be damaged by the operation. The amount of such bond will be 
established after a review by the Town Engineer. 
  
 q. All feasible and prudent steps shall be taken to assure that the operation 
continues to comply with the above criteria throughout the period of the operation. 
Upon a determination by the ZEO that the operation is not in compliance, the 
operation shall immediately cease and the operation shall not be allowed to 
continue until written approval is provided by the ZEO. Such written approval shall 
not be provided without a written documentation of the issues which led to the 
cessation of the operation and the resolution of the issue. Any operation that 
continues following a notice to cease shall be subject to the remedies and 
sanctions provided by the Connecticut General Statutes and Section 10.1 of the 
Granby Zoning Regulations. 
  
 r. A Zoning Permit will remain in effect for a period of 90 days, after which it shall 
become void. The ZEO shall not issue a new permit without the subsequent filing 
of a map which shows, through the report of a professional engineer, that the 
excavation already completed conforms to the plan of operations as approved. 
  
9.13 Special Permit Applications 
  
 In addition to the above criteria, when considering Special Permit applications under 
this Section, the Commission shall review the criteria of Section 8.2 and apply it with 
the understanding that the Excavation and Filling activity is temporary and base the 
determination on the proposed condition of the property in its completed state. The 
Commission shall consider any appropriate action necessary to limit the length of any 
operation and take other additional measures as necessary to limit the negative 
impacts on surrounding properties and may deny any application where it finds that 
the proposal will result in an unusual hardship or exceptional difficulty on the Town 
and/or the area residents. In its review the Commission shall consider the following 
additional items: 
  
 a. Potential soil erosion and sedimentation affecting all land and bodies of water 
both on-site and off-site. 
  
 b. Effects on drainage and groundwater table. 
  
 c. Lateral support slopes, grades and elevations of abutting streets and 
properties. 
  
 d. Effect of the operation and any related traffic circulation and road condition on 
streets serving the parcel under consideration. 
  
 e. Any decision issued by the Inland Wetlands and Watercourses Commission. 
  
 f. Any recommendation or approval of the Connecticut Department of 
Transportation or Department of Energy and Environmental Protection and/or 
the U.S. Army Corps of Engineers. 
  

Page 53 · open in PDF

SECTION 9 
EARTH EXCAVATION, FILLING AND GRADING 
189 
 g. Any recommendation of the Town’s Engineer, Director of Public Works 
Department, the Conservation Commission, and the Director of Community 
Development. 
  
 
 h. The scope and duration of the project and temporary and long-term effects on 
surrounding properties. 
  
9.14 Approved Applications: 
  
 In approving an application, the Commission shall exercise its authority to minimize 
any negative effects that the proposed operation may have on the Town and the area 
residents. 
  
 1. In approving an application, the Commission shall take appropriate action to limit 
the length of any operation and shall specify the time period within which an 
excavation, or filling, activity shall be completed, but in no event shall the time 
period of the approval exceed two (2) years. An approved permit shall then expire 
on the date set by the Commission or two (2) years from the start date set by the 
Commission unless such permit is renewed by the Commission. The Commission 
shall not renew or extend any permit unless the operator is able to show, through 
the report of a professional engineer, PE that the excavation already completed 
conforms to the plan of operations as approved. 
  
 2. The Commission may require the applicant to submit periodic reports, prepared by 
and bearing the seal of a professional land surveyor or engineer, showing the 
status and progress of the work. 
  
 3. As a condition of any special permit, the Commission may require that the 
applicant furnish a performance and/or maintenance bond, acceptable to the 
Commission in form, amount, and surety, securing to the Town of Granby the 
faithful performance of the work proposed, pursuant to both the provisions of this 
or other applicable sections of these regulations and to the specific conditions of 
approval. 
  
 4. No bond shall be released until: 
  
 a. The Commission receives an as-built survey prepared by a professional land 
surveyor that the project has been completed according to approved plans and 
conditions attached thereto; 
  
 b. The Commission is satisfied the work has been completed as required; and 
  
 c. Disturbed areas have been appropriately graded and stabilized with vegetation 
to result in erosion-free conditions. 
 

Page 54 · open in PDF

Roofs 
Section 8.30.1.1 
Roof Pitch 
 
https://www.americanmetalroofswi.com/roof-pitch/ 
 

Page 55 · open in PDF

 
 
 
https://skroofingandconstruction.com/understanding-4-12-roof-pitch-angle/ 

Page 56 · open in PDF

 
https://www.instagram.com/p/DVDrGmhiE01/  
 

Page 57 · open in PDF

Mansard Roof 
 
 
 
 
 

Page 58 · open in PDF

Federal Roof 
 
 
 
 
 
 
 
 
 
 
 

Page 59 · open in PDF

Gables and Dormers 
Section 8.30.1.3 
Gable: 
 
https://www.google.com/search?sca_esv=f77eb908d38b3c2a&udm=2&fbs=ADc_l-aN0CWEZBOHjofHoaMMDiKpaEWjvZ2Py1XXV8d8KvlI3o6iwGk6Iv1tRbZIBNIVs-5-bUj3iBl-
UxHsANYwOkWWIHyK1NRBVtxaVLlI368r1sO_OMujwuZE1H9wBGiUEFKaIv-UExzkT4rqVSLwXbL5yWPGopUNljv5GQ5DwuDVa-
IKUeFZ70StwpJt_rJTYvLKtJx3fZhTEKDS9dAdZKM0nO474w&q=roof+gable&sa=X&ved=2ahUKEwiV8erpo9yTAxWjt4kEHY1tMeIQtKgLegQIERAB&biw=1920&bih=975&dpr=1#sv=CAMSVh
oyKhBlLUdfY1FZRG5TUndCMFJNMg5HX2NRWURuU1J3QjBSTToOZlNMS2t1alpXU3NIUU0gBCocCgZtb3NhaWMSEGUtR19jUVlEblNSd0IwUk0YADABGAcghdGRtw5KCBABGAEgASgB 
 
Dormer: 
 
https://www.homeadvisor.com/cost/roofing/add-a-dormer/ 
 

Page 60 · open in PDF

Gables and Dormers 
Section 8.30.2.1 
Horizontal plane: 
 
https://www.google.com/search?q=townhouse+building+diagram+with+20-foot+wall+and+2-
foot+linear+offset&sca_esv=a0464d9551b247bc&udm=2&biw=1920&bih=975&ei=1ErVaYScHZKtptQP-
_GegAo&ved=0ahUKEwiE1sKordyTAxWSlokEHfu4B6AQ4dUDCBI&uact=5&oq=townhouse+building+diagram+with+20-foot+wall+and+2-
foot+linear+offset&gs_lp=Egtnd3Mtd2l6LWltZyJFdG93bmhvdXNlIGJ1aWxkaW5nIGRpYWdyYW0gd2l0aCAyMC1mb290IHdhbGwgYW5kIDItZm9vdCBsaW5lYXIgb2Zmc2V0SM0bUIEM
WPwYcAJ4AJABAZgBpAGgAZgFqgEDOS4xuAEDyAEA-AEBmAIAoAIAmAMAiAYBkgcAoAfCA7IHALgHAMIHAMgHAIAIAA&sclient=gws-wiz-
img#sv=CAMSVhoyKhBlLU5QMXZmSV9YWHJ1TDdNMg5OUDF2ZklfWFhydUw3TToOclFJQnVXSkVIUFhUQ00gBCocCgZtb3NhaWMSEGUtTlAxdmZJX1hYcnVMN00YADABGAcg0pyogQp
KCBABGAEgASgB 
Linear Feet: 
18 East Granby Road: 30 feet 
 

Page 61 · open in PDF

 
15 East Granby Road: 56 feet and 30 feet 
 
 
 
 
16 East Granby Road: 20 feet / 28 feet 
 
 
 
 

Page 62 · open in PDF

265 Salmon Brook Street: 31 feet 
 
 
255 Salmon Brook Street: 25 feet 
 

Page 63 · open in PDF

254 Salmon Brook Street: 40 feet 
 
 
 
 

Page 64 · open in PDF

TOWN OF GRANBY 
 
 
 
MEMORANDUM   
 
TO: Planning and Zoning Commission 
 
CC: Thomas Kalista 
 
FROM:  Abby Kenyon, Director of Community Development 
 
DATE:  April 9, 2026 
 
RE: Discussion about possible action regarding 280 Salmon Brook Street, Station 280: Bond 
status for outstanding work and Certificate of Occupancy 
 
______________________________________________________________________________ 
 
The Station 280 development, located at 280 Salmon Brook Street, was approved by the Planning 
and Zoning Commission at its meeting on February 11, 2020. In its approval letter, the following 
was included: 
 
“Per Section 4.2.7 of the Zoning Regulations, prior to the issuance of a building permit, a bond 
must be filed with the Town to guarantee the completion of the work required on the plan within 
that particular phase. The applicant’s engineer shall prepare an estimate containing the type, 
estimated quantities, and costs of materials needed to complete the required improvements. The 
bond estimate s hall then be reviewed and approved by the Town Engineer. If there is a 
disagreement between the applicant’s engineer and the Town Engineer, the applicant shall present 
the bond estimate to the Commission for their decision. The bond may be in the form of c ash, 
certified check, or performance surety, provided the terms and conditions of the surety bond shall 
be acceptable in form and substance to the town.” 
 
In accordance with this provision, a surety bond was submitted. This bond was reduced in August 
2024 to reflect the completion of  some site work items. The current surety bond in the Town file 
is $1,542,988.21. 
 
At this time, all five buildings have been completed and certificate of occupancies (C/O) have been 
issued. There is a outstanding C/O for the pool/pavilion area. The property owner has requested 
this C/O be issued upon final inspection by the Building Official. 
 
When the Building Official issues this  final C/O for the project, he is certifying that the property 
is in compliance with the zoning regulations and the Commission’s approval. As there are 
outstanding items to be completed, it is staff’s position that a C/O should not be issued until all 
required items are completed. The following items are outstanding at this time: 
1) Final topcoat of pavement. 

Page 65 · open in PDF

2) Line striping after topcoat. 
3) Final landscaping inspection/verification plantings are in accordance with the approved 
plans, including fencing. 
4) Site to be stabilized and all silt fence/E&S measures to be removed. 
5) Final review that all trash/debris has been removed. 
6) Design engineer to issue a Certificate of Compliance which states the infrastructure was 
constructed in accordance with the approved plans. 
7) An as-built of the site utilities, structures, and hard surface to be prepared, approved by the 
Town Engineer, and filed with the Town Clerk 
 
The Commission is asked to consider the request by the property owner, which is to release the 
C/O pending final inspection by the Building Official despite the outstanding items. 
 
Refer to the attached letter. 
 

Page 66 · open in PDF

 
 
 
Abigail, 
Burkentine would like to formally request a time slot for an upcoming Planning & Zoning hearing in 
Granby for the Station 280 project. 
 
We’d like to discuss obtaining certificates of occupancy for the pool and pavilion ahead of the final top 
coat paving. Both areas have already been inspected by the State and are complete from a safety and 
functionality standpoint, and there are no safety concerns associated with their use. The remaining top 
coat work is relatively minor and won’t impact access to or operation of these amenities. 
Given that, we’re hoping the Town would consider allowing use of the pool and pavilion while we 
finalize scheduling for the paving. As you know, timing for top coat work can be dependent on 
contractor availability and weather, and holding these amenities back in the meantime would 
unnecessarily limit tenants’ access to facilities that are otherwise ready and safe to use. 
 
For context, we formally requested pricing in December from M&O, a local Connecticut contractor. 
They’ve received two quotes, and we’re working through next steps to move the paving forward. 
We’re committed to finishing the remaining work and staying aligned with the Town throughout. We’d 
appreciate the opportunity to walk through this with you and the Commission. 
Let me know what your schedule looks like, or if there’s anything you’d like from us in advance. 
 
Thanks, 
Thomas Kalista 
Burkentine Real Estate Group 
 
 

Page 67 · open in PDF

TOWN OF GRANBY 
 
 
 
MEMORANDUM   
 
TO: Planning and Zoning Commission 
 
CC: Richard Case 
 
FROM:  Abby Kenyon, Director of Community Development 
 
DATE:  April 9, 2026 
 
RE: Informal Discussion: 551 Salmon Brook Street, Granby Motel, possible conversion to 
residential use and associated site improvements  
______________________________________________________________________________ 
 
The property, 551 Salmon Brook Street, is 4.1 acres in the C2 (Business) Zone. The Granby Motel 
currently occupies the site. The motel is set back about 100 feet from the front property line and 
there is one driveway from Salmon Brook Street that provides access to a parking lot, which is 
located in front of the motel (see aerial below). The motel has a septic system and well—public 
water and sewer are not available.  
 
 
 

Page 68 · open in PDF

 
 
Staff was contacted by a developer who is interested in converting the motel into apartment units. 
This would be considered a multi-family use. Multi-family is not currently an allowable use in the 
C2 Zone, either by right or by special permit. As the Commission is aware, legislation that was 
passed allows 2-9 residential units in commercial zones by summary review. However, even with 
the regulation changes the Commission will have to adopt in response to this legislation, the 
changes would not apply to this property as the developer would propose 14 units.  
 
Before moving forward with a possible text amendment, it was suggested that the developer 
present informally to the Commission.  
 
Below is a summary of the possible project. The following page shows a possible rendering of the 
converted building.  
 
Project Summary: 
We are proposing to substantially improve and expand the existing building by adding new square 
footage to the rear, effectively doubling its size. The project would create a total of 14 apartment 
units, consisting of a mix of one- and two-bedroom layouts. We also plan to add 10 garages on the 
site. 
 
Key improvements include: 
• Upgrading the well system 
• Replacing the septic system 
• Bringing the entire building up to current building code 
• Each apartment with its own private exterior entrance 
 
To enable this project, we intend to prepare language for a zoning regulation amendment that 
would allow multifamily housing by special permit in this district. We would like to gauge the 
town’s initial reaction to this concept. 
 
 
 
 
 
 
 
 

Page 69 · open in PDF

Rendering: 
 
 

Minutes: archived copy, SHA-256 562ab6e73a9f…. Agenda: archived copy, SHA-256 802f2af17170…. Packet: archived copy, SHA-256 353ab55be849….