Inland Wetlands & Watercourses Commission, Nov 12, 2026

Granby minutes posted

Documents

TypeDocumentPagesOpen
minutes IWWC Minutes 3 PDF download · town site
agenda IWWC Agenda 1 PDF download · town site
packet IWWC Meeting Packet 57 PDF download · town site

Summary of the minutes

AI-generated summary. Each line links to the PDF page it came from; check it before relying on it.

Read the official minutes (PDF, 3 pages) The PDF is the record; this summary is a guide to it.

The Granby Inland Wetlands and Watercourses Commission approved its October 14, 2026 minutes with one amendment, approved a pond maintenance request at 12 Northwoods Road as an As of Right Determination, and approved the 90 Salmon Brook and 35 Floydville Road erosion stabilization application. It denied the 37 Hartford Avenue apartment building permit, continued the 142R and 186 Case Street cattle farm review to January 2027, and continued discussion of request-for-review sign-off authority to the next regular meeting.

Decisions (6) · all reported votes

  1. Approval of October 14, 2026 meeting minutes
    Approved as amended, striking 'due to the overgrowth of invasive species' from the bottom of page 2
    Vote: Motion by F. Jones, second by B. Schmitt, carried 5-0-0 · p. 1
  2. 12 Northwoods Road – N. Kimball and M. Nasshan – RFR to conduct pond maintenance within a regulated area
    Approved as an As of Right Determination per the Inland Wetlands and Watercourses Commission Regulations, Section 4.1.d; area approximately 40 square feet
    Vote: Motion by D. Tolli, second by F. Jones, carried 5-0-0 · p. 1
  3. 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – RFR for site evaluation and stabilization of erosion and sedimentation issues within a regulated area
    Application and draft approval letter approved as presented
    Vote: Motion by F. Jones, second by D. Tolli, carried 5-0-0 · p. 1
  4. 37 Hartford Avenue – F. Devine – Permit application for regulated activities for a 16-unit apartment building and associated site improvements 2,450 gpd 3,700 gpd
    Application denied as presented; draft denial letter read into the record by S. Okie; amendment to Item#1c changing 2,450 gpd to 3,700 gpd
    Vote: Motion by D. Tolli, second by F. Jones, carried 5-0-0 · p. 2
  5. 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – RFR to establish a cattle farm with paddocks, run-in sheds, underground electrical conduit, etc.
    Continued to the January 2027 regular meeting at applicant's request; revised RFR to be submitted for the northwest section only
    Vote: Motion by N. Dethlefsen, second by F. Jones, carried 5-0-0 · p. 2
  6. Request for Review Sign Off Authority Discussion
    Discussion continued to the next regular meeting so all members may be present
    Vote: Motion by D. Tolli, second by N. Dethlefsen, carried 5-0-0 · p. 2, p. 3

Also discussed (1)

  • Agent Report: 142R and 186 Case Street – Conducting a Regulated Activity without a valid IWWC Permit: Discussed as part of agenda item 6a; no separate action recorded · p. 2
Summary of the agenda: IWWC Agenda

AI-generated summary.

This is the agenda for the Inland Wetlands and Watercourses Commission's November 12, 2026 regular meeting, which lists requests, permit applications, and reports but records no decisions yet. Items include a request for review for pond maintenance at 12 Northwoods Road, a solar site evaluation request at 90 Salmon Brook and 35 Floydville Road, a permit application for a 16-unit apartment building at 37 Hartford Avenue, and matters involving 142R and 186 Case Street.

On the agenda (7)

  1. Action on the October 14, 2026, Meeting Minutes · p. 1
  2. 12 Northwoods Road – N. Kimball and M. Nasshan – Request for Review to conduct pond maintenance within a regulated area (received/continued from 9/9/26) · p. 1
  3. 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – Request for Review for site evaluation and stabilization of erosion and sedimentation issues within a regulated area (received/continued from 10/14/26) · p. 1
  4. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in connection with development of a 16-unit apartment building and associated site improvements (public hearing closed 10/14/26; Commission discussion/possible action) · p. 1
  5. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a regulated activity without a valid IWWC permit (Agent Report and Correspondence) · p. 1
  6. 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Request for Review to establish a cattle farm with paddocks, run-in sheds, underground electrical conduit, etc. · p. 1
  7. Request for Review Sign Off Authority Discussion · p. 1

Full text of the documents

View the minutes PDF on this page (IWWC Minutes) Open the PDF
Text of the minutes (IWWC Minutes, 3 pages)

Page 1 · open in PDF

 
1 
 
MEETING MINUTES 
Town of Granby 
Inland Wetlands and Watercourses Commission 
Thursday, November 12, 2026, at 7:00 pm 
 
PRESENT: Nick Dethlefsen, David Tolli, Sue Okie, Barbara Schmitt, and Fred Jones 
ALSO PRESENT: IWWC Agent Kate Bednaz and Land Use Coordinator Renee Deltenre 
 
1. Call to Order 
Acting Chair S. Okie called the meeting to order at 7:00 p.m. 
 
2. Action on the October 14, 2026, Meeting Minutes 
 
ON A MOTION by F. Jones seconded by B. Schmitt, the Commission voted 5-0-0 to 
approve the October 14, 2026, meeting minutes as amended to reflect the following change: 
a. Bottom of page 2, strike out “due to the overgrowth of invasive species”. 
 
3. Request for Review 
a. 12 Northwoods Road – N. Kimball and M. Nasshan – RFR to conduct pond 
maintenance within a regulated area.  
K. Bednaz stated that she recently conducted a site visit, and a revised application has 
been submitted to address staff comments. They are seeking permission to remove 
sediment and overgrown vegetation from an existing fire pond on their property. Over the 
summer large volumes of rainwater and sediment have accumulated, thus encouraging 
the rapid growth of vegetation that is hindering stream flow and potential backup at the 
existing culvert. The subject area is approximately 40 square feet, and an excavator 
would be utilized from the driveway to remove the material.  
 
ON A MOTION by D. Tolli seconded by F. Jones, the Commission voted 5-0-0 to 
approve the application as an As of Right Determination per the Inland Wetlands and 
Watercourses Commission Regulations, Section 4.1.d. 
 
4. Permit Requests 
a. 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – RFR for 
site evaluation and stabilization of erosion and sedimentation issues within a 
regulated area.  
Kevin Sullivan and John Gravel (via zoom) were present to discuss the application. K. 
Sullivan provided a status update and overview of his recent site inspection with K. 
Bednaz. The three areas of concern were man-made scours, and the sediment will be 
removed when the timing is right. At this time, no further erosion has occurred, and water 
is still being diverted with the help of straw waddles. K. Bednaz indicated that the site 
appears to be in good shape and provided a draft approval letter for consideration.  
 
ON A MOTION by F. Jones seconded by D. Tolli, the Commission voted 5-0-0 to 
approve the application and draft approval letter as presented.  
 

Page 2 · open in PDF

 
2 
 
b. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in 
connection with the development of a 16-unit apartment building and associated site 
improvements.  
The public hearing for this application concluded on 10/14/26. The Commission 
deliberated on the application, stating their concerns regarding the potential impact to the 
neighboring wetlands. There was a general consensus that the site is not conducive to the 
proposed use, nitrogen levels were of concern, and no prudent or feasible alternatives 
were provided by the applicant. K. Bednaz provided clarification regarding FVHD and 
CT Public Health Code requirements and questioned what the Commission would find 
acceptable for a proposed development on this site. A draft denial letter was provided for 
consideration and read into the record by S. Okie. An amendment was made to Item#1c, 
to change 2,450 gpd to 3,700 gpd. 
 
ON A MOTION by D. Tolli seconded by F. Jones, the Commission voted 5-0-0 to deny 
the application as presented.  
 
5. Agent Report and Correspondence 
a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – 
Conducting a Regulated Activity without a valid IWWC Permit. 
This agenda item was discussed as part of agenda item #6a. 
 
6. Request for Review 
a. 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – RFR to establish a 
cattle farm with paddocks, run-in sheds, underground electrical conduit, etc.  
Attorney Timothy Furey was present on behalf of the property owner to provide updates. 
A report and associated mapping from Jacob Isleib of the USDA-NRCS was provided 
and reviewed at length. Roughly three weeks ago, the property owner met with DEEP 
regarding review of the engineered plans for the dam, and more information was 
requested. Soil Scientist David Lord ran through his revised soils report, detailing 
information on the northwest section of the property and noted that his findings 
throughout both subject properties coincide with the mapping provided by NRCS. K. 
Bednaz expressed concerns regarding the lack of a survey and requested a site inspection 
to verify the wetlands flagging. After some deliberation, Attorney Furey requested a 
continuation of these agenda items to the January 2027 meeting, at which time a revised 
Request for Review will be submitted for the northwest section only.   
 
ON A MOTION by N. Dethlefsen seconded by F. Jones, the Commission voted 5-0-0 to 
continue this agenda item to the January 2027 regular meeting. 
 
7. Request for Review Sign Off Authority Discussion 
As part of the meeting packet, the Commission received revised guidelines pertaining to the 
submittal and consideration of Request for Reviews. In order to streamline and expedite the 
application process, it has been past practice for the IWWC Agent, Chair or Vice Chair to 
approve Request for Reviews. K. Bednaz requested that the Commission review the 
document and N. Dethlefsen recommended that the discussion be continued so that all 
members may be present.  

Page 3 · open in PDF

 
3 
 
ON A MOTION by D. Tolli seconded by N. Dethlefsen, the Commission voted 5-0-0 to 
continue discussion to the next regular meeting.  
 
8. Commissioner Reports and Correspondence 
None 
 
9. Adjourn 
 
ON A MOTION by N. Dethlefsen seconded by D. Tolli, the Commission voted 5-0-0 to 
adjourn the meeting at 8:58 p.m. 
 
Respectfully submitted, 
 
 
 
Renee Deltenre 
Land Use Coordinator 
 
View the agenda PDF on this page (IWWC Agenda) Open the PDF
Text of the agenda (IWWC Agenda, 1 page)

Page 1 · open in PDF

Town of Granby 
Inland Wetlands and Watercourses Commission 
Regular Meeting Agenda 
Thursday, November 12, 2026, at 7:00 pm 
Town Hall Meeting Room 
 
Please note: Any person who wishes to provide materials for display on the video monitors at an IWWC meeting where such 
monitors are being used to video conference the meetings must email the materials no later than 10 AM on the day of the 
meeting. All materials must be contained in a single attachment to the email.  Materials received after the 10 AM deadline will 
not be accepted for display. Display of the materials is subject to all other rules and procedures of the IWWC. Zip drive, memory 
sticks and other data storage devices will not be accepted. 
Zoom: https://us06web.zoom.us/j/89806793152?pwd=yIRgs7C1LEmLMJG0xeUsg5ecQJeXlD.1 
Call In: 929-205-6099 
Meeting ID: 898 0679 3152 
Passcode: 590656 
 
1. Call to Order 
 
2. Action on the October 14, 2026, Meeting Minutes 
 
3. Request for Review 
a. 12 Northwoods Road – N. Kimball and M. Nasshan – RFR to conduct pond maintenance 
within a regulated area. (Received/continued from 9/9/26) 
 
4. Permit Requests 
a. 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – RFR for site 
evaluation and stabilization of erosion and sedimentation issues within a regulated area. 
(Received/continued from 10/14/26) 
 
b. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in 
connection with the development of a 16-unit apartment building and associated site 
improvements. (Public hearing closed on 10/14/26; Commission Discussion/Possible 
Action) 
 
5. Agent Report and Correspondence 
a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a 
Regulated Activity without a valid IWWC Permit. 
 
6. Request for Review 
a. 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – RFR to establish a cattle 
farm with paddocks, run-in sheds, underground electrical conduit, etc.  
 
7. Request for Review Sign Off Authority Discussion 
 
8. Commissioner Reports and Correspondence 
 
9. Adjourn 
View the packet PDF on this page (IWWC Meeting Packet) Open the PDF
Text of the packet (IWWC Meeting Packet, 57 pages)

Page 1 · open in PDF

Town of Granby 
Inland Wetlands and Watercourses Commission 
Regular Meeting Agenda 
Thursday, November 12, 2026, at 7:00 pm 
Town Hall Meeting Room 
 
Please note: Any person who wishes to provide materials for display on the video monitors at an IWWC meeting where such 
monitors are being used to video conference the meetings must email the materials no later than 10 AM on the day of the 
meeting. All materials must be contained in a single attachment to the email.  Materials received after the 10 AM deadline will 
not be accepted for display. Display of the materials is subject to all other rules and procedures of the IWWC. Zip drive, memory 
sticks and other data storage devices will not be accepted. 
Zoom: https://us06web.zoom.us/j/89806793152?pwd=yIRgs7C1LEmLMJG0xeUsg5ecQJeXlD.1 
Call In: 929-205-6099 
Meeting ID: 898 0679 3152 
Passcode: 590656 
 
1. Call to Order 
 
2. Action on the October 14, 2026, Meeting Minutes 
 
3. Request for Review 
a. 12 Northwoods Road – N. Kimball and M. Nasshan – RFR to conduct pond maintenance 
within a regulated area. (Received/continued from 9/9/26) 
 
4. Permit Requests 
a. 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – RFR for site 
evaluation and stabilization of erosion and sedimentation issues within a regulated area. 
(Received/continued from 10/14/26) 
 
b. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in 
connection with the development of a 16-unit apartment building and associated site 
improvements. (Public hearing closed on 10/14/26; Commission Discussion/Possible 
Action) 
 
5. Agent Report and Correspondence 
a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a 
Regulated Activity without a valid IWWC Permit. 
 
6. Request for Review 
a. 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – RFR to establish a cattle 
farm with paddocks, run-in sheds, underground electrical conduit, etc.  
 
7. Request for Review Sign Off Authority Discussion 
 
8. Commissioner Reports and Correspondence 
 
9. Adjourn 

Page 2 · open in PDF

 
1 
MEETING MINUTES 
Town of Granby 
Inland Wetlands and Watercourses Commission 
Wednesday, October 14, 2026, at 7:00 p.m. 
 
PRESENT: Nick Dethlefsen, David Tolli, Sue Okie, John Laudati, Barbara Schmitt, and Fred Jones 
ALSO PRESENT: IWWC Agent Kate Bednaz and Land Use Coordinator Renee Deltenre (Zoom) 
 
1. Call to Order 
Chair J. Laudati called the meeting to order at 7:00 p.m. 
 
2. Action on the September 9, 2026, Meeting Minutes 
 
ON A MOTION by S. Okie seconded by B. Schmitt, the Commission voted 6-0-0 to approve 
the September 9, 2026, meeting minutes as amended to reflect the following changes: 
a. Top of page 2, change “shall connect” to “should connect”. 
b. Middle of page 4, convert sentence starting with “K. Bednaz…” into item #7c. 
 
3. Public Hearings 
a. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in 
connection with the development of a 16-unit apartment building and associated site 
improvements.  
Professional Engineer Rebecca Li was present to discuss the application, along with applicant 
Forrest Devine and Attorney Rachel Fancy. R. Li ran through the application timeline and 
documentation submitted to date, noting that a thorough and good faith effort has been made 
to address all comments/concerns. F. Devine submitted three documents that contain findings 
and supporting documentation related to the intervenor’s Professional Engineer Steve 
Trinkaus and read his letter into the record.  
 
Public Comment 
Attorney George Schober, representative for abutting property owner Peter Voskowsky, 
spoke in defense of Professional Engineer Steve Trinkaus and claims that F. Devine’s letter 
and comments are irrelevant. Attorney Schober claims that the application is incomplete and 
no documentation regarding the impact of stormwater/effluent has been provided. It was 
stated that feasible and prudent alternatives consist of connecting to public sewer or reducing 
the unit count. 
 
Professional Engineer Steve Trinkaus responded to comments and documentation provided 
by Forrest Devine. He noted that no groundwater water monitoring has been conducted, so 
there is not enough data to determine groundwater levels and direction of flow. Only a small 
portion of the site is available for nitrogen dilution and a pollutant loading analysis was not 
provided.  
 
Jack LaReau of the Salmon Brook Water District expressed concerns regarding potential 
nitrogen levels and groundwater pollution. He provided information regarding the existing 
aquifers in the area and is opposed to any waiver or compromise of the IWWC Regulations.  
 

Page 3 · open in PDF

 
2 
Reinhard Maier, 138 Day Street, stated that he is not against development, just concerned 
with pollution. He stated concerns regarding the proposed septic and leaching system and 
noted that a third option was never considered by the applicant, which is a high-reduction 
nitrogen, low-discharge system.  
 
Robert Flanigan, 24 Woodcliff Drive, spoke in opposition to the project citing concerns of 
potential wetlands contamination due to seepage of effluent, as well as surface treatment of 
the parking lot. 
 
Maureen Eberly, 37 Silkey Road, stated that the developer should conduct a market analysis 
and urged the Commission to reject the proposal.  
 
R. Li reminded the Commission that a sewer extension feasibility analysis was provided on 
7/8/26 and has no further comments.  
 
ON A MOTION by D. Tolli seconded by F. Jones, the Commission voted 6-0-0 to close the 
public hearing at 7:46 p.m. and continue the application to the next regular meeting.  
 
ON A MOTION by D. Tolli seconded by N. Dethlefsen, the Commission voted 6-0-0 to amend the 
agenda to discuss Item#4a and Item#6B simultaneously.  
 
J. Laudati was recused at 7:49 p.m. 
 
4. Show Cause Hearing 
a. 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a Regulated Activity without 
a valid IWWC Permit. 
This agenda item was discussed as part of agenda item #6b. 
 
J. Laudati was seated at 8:22 p.m.  
 
5. Request for Review 
a. 12 Northwoods Road – N. Kimball and M. Nasshan – RFR to conduct pond 
maintenance within a regulated area.  
Applicants/property owners Nicholas Kimball and Marissa Nasshan submitted a request for 
continuance prior to the meeting. 
 
ON A MOTION by F. Jones seconded by S. Okie, the Commission voted 6-0-0 to grant the 
request and continue the Request for Review to the next regular meeting.  
 
b. 199 Barn Door Hills Road – J. Lambert c/o Lambert’s Lawn Care – RFR to conduct 
pond and culvert maintenance, plantings, and invasive species management within a 
regulated area.  
Applicant Joseph Lambert of Lambert’s Lawn Care was present to discuss the application. 
He is seeking permission to restore an existing pond on-site that is suffering from low water 
levels due to the overgrowth of invasive species, the accumulation of excess sediment, and 
erosion of the pond’s boundaries. Proposed maintenance includes clearing all obstructions 
from the culvert to the pond, removing invasives, adding rock formations and silt fencing to 
stabilize the borders of the pond, and applying all-natural “Muckout” to introduce healthy 

Page 4 · open in PDF

 
3 
bacteria and enzymes back into the water. In order to aerate and oxygenate the water, a 
fountain is proposed in the center of the pond, which would require the installation of 
underground electrical conduit and a water line.  
 
The homeowner would also like to improve other areas of the property by removing 
dead/diseased trees, removing invasives, eliminating raised garden beds, etc. J. Lambert 
noted that establishment of the pond coincides with the development of the Kettle Pond Lane 
subdivision. J. Laudati questioned whether the proposed activities are permitted under an 
RFR or would require a permit. K. Bednaz and the Commission deliberated on the scope of 
work and determined that stabilization of the site, invasives removal, drainage, and boulder 
placement were permitted under the RFR. The installation of underground electrical conduit 
and water line for a water fountain requires the submittal of a permit application.  
 
ON A MOTION by J. Laudati seconded by S. Okie, the Commission voted 6-0-0 to approve 
the application as an As of Right Determination per the Inland Wetlands and Watercourses 
Commission Regulations, Section 4.1.d, limited to the stabilization of the site, invasives 
removal, drainage, and boulder placement. 
 
c. 45 Barkhamsted Road – N. Higley –  RFR to excavate and remove debris from front 
yard and reestablish lawn area within a regulated area. 
Applicant Nicholas Higley was present to discuss the application. He is seeking permission to 
clean up the property by excavating and removing debris that was buried throughout the yard. 
He plans to excavate 2 feet down to capture all the debris, save 3-4” of soil, bring in 
additional soil for a new base, and then spread 18-20” of topsoil. Erosion and sedimentation 
control measures will be installed and once graded, grass seed and mulch will be applied. In 
addition, the construction of a stone wall is proposed. All work is within the 200-foot upland 
review area of Salmon Brook.  
 
ON A MOTION by J. Laudati seconded by S. Okie, the Commission voted 6-0-0 to approve 
the application as an As of Right Determination per the Inland Wetlands and Watercourses 
Commission Regulations, Section 4.1.d. 
 
Agenda item#6A was discussed after agenda item#8. 
 
6. Permit Requests 
b. 7 Laurel Drive – C. Fontaine and R. Weiner – Permit request to place a prefabricated 
shed on crushed stone, install drainage piping, remove pine trees, install a split-rail 
fence and restore lawn within a regulated area.  
Professional Engineer TJ Barresi, as well as property owners Colleen Fontaine and Ross 
Weiner were present to discuss their application, which was received and continued from the 
prior meeting. Revised plans were submitted today that reflect changes in location for the 
shed, yard drain and drainage swale, and address staff comments regarding elevations and a 
mitigation plan. K. Bednaz provided background information on the property, as well as 
observations made during various site inspections. Although some plants required as part of 
the prior Enforcement Order have not survived, she noted that other vegetation has naturally 
taken over.  
 

Page 5 · open in PDF

 
4 
Alternative planting locations were recommended, and a draft approval letter was provided 
for review and consideration by the Commission. Attorney Kari Olson and Soil Scientist 
Thomas Stansfield were present via zoom. T. Stansfield stated that the improvements shown 
on the revised plans were sufficient and would not have an adverse impact on the site. K. 
Olson requested specificity on the alternative plantings and C. Fontaine questioned the 
plantings that were required as part of the prior Enforcement Order. K. Bednaz provided 
clarification, and the Commission reviewed the draft approval letter. 
 
ON A MOTION by B. Schmitt seconded by N. Dethlefsen, the Commission voted 4-1-0 to 
approve the application and draft approval letter as amended. D. Tolli opposed.  
 
c. 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – RFR for site 
evaluation and stabilization of erosion and sedimentation issues within a regulated area.  
Kevin Sullivan and John Gravel (via zoom) were present to discuss the application. In 
response to staff comments at the last meeting, an application was submitted to address the 
aftermath of erosion that occurred on site. K. Bednaz stated that documentation must be 
submitted detailing how much sediment was removed, where it was deposited, how it will be 
removed, a mitigation plan, and timeline. K. Sullivan noted that soil samples were taken and 
they were able to narrow the erosion down to two scours. The plan is to remove the 
sedimentation then put down a native seed mix. Cultivation of the site has begun, and no 
further erosion has occurred since the installation of additional erosion and sedimentation 
control measures. K. Bednaz noted that the application is listed as an RFR and needs to be a 
permit request with submittal of the corresponding fee. The application was received and 
continued to the next regular meeting. 
 
J. Laudati was recused at 9:21 p.m. 
 
7. Agent Report and Correspondence 
a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a 
Regulated Activity without a valid IWWC Permit. 
Attorney Timothy Furey was present on behalf of the property owner to provide updates. 
Based on conversation with Town Attorney Richard Roberts, Attorney Furey will work 
directly with Attorney Roberts on addressing the Enforcement Order, which will then be 
directed to IWWC Agent Kate Bednaz, and finally, the Commission. At this time, no updates 
have been provided from DEEP regarding review of the engineered plans for the dam. 
Attorney Furey provided documentation from Nick Zito of the CT DEEP Forestry Division, 
stating that they have no concerns with respect to the forestry operation on the subject 
property. Logging contractor Matthew Yard spoke in regard to the logging operation he 
conducted on the property, noting that 75 acres were approved for clearing; however, only 
50% was completed. K. Bednaz provided clarification regarding issues surrounding the RFR 
as some of the activities conducted have impacted existing wetlands. She notified the 
Commission that a demand letter has been issued by Town Attorney Richard Roberts and 
stated that all wetland boundaries must be shown on a plan for the cattle RFR to be 
considered.  
 
ON A MOTION by N. Dethlefsen seconded by B. Schmitt, the Commission voted 5-0-0 to 
continue this agenda item to the next regular meeting. 
 

Page 6 · open in PDF

 
5 
8. Request for Review 
a. 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – RFR to establish a cattle 
farm with paddocks, run-in sheds, underground electrical conduit, etc.  
This agenda item was tabled per the request of applicant representative Attorney Furey.  
 
J. Laudati was re-seated at 9:43 p.m. 
The Commission took a 4-minute recess at 9:43 p.m. 
 
6.   Permit Requests 
a.  53 West Granby Road and 215 Salmon Brook Street – Town of Granby – Permit 
application to construct a walking path and associated improvements within a regulated 
area. 
Since the application was received and discussed at the prior meeting, revised plans have 
been submitted to address all outstanding items. IWWC Agent Kate Bednaz and the 
Commission had no questions or concerns.  
 
ON A MOTION by S. Okie seconded by D. Tolli, the Commission voted 6-0-0 to approve 
the application and draft approval letter as presented.  
 
9. Commissioner Reports and Correspondence 
None 
 
10. Adjourn 
 
ON A MOTION by S. Okie seconded by N. Dethlefsen, the Commission voted 6-0-0 to adjourn 
the meeting at 9:50 p.m. 
 
Respectfully submitted, 
 
 
 
Renee Deltenre 
Land Use Coordinator 
 

Page 7 · open in PDF

APPLICATION FOR INLAND 
WETLANDS & 
WATERCOURSES ACTIVITY
REQUEST FOR REVIEW
For submission from Nicholas Kimball & Marissa Nasshan
12 Northwoods Rd, North Granby, CT 06060
Submission topic- removing sediment from pond

Page 8 · open in PDF

OVERVIEW MAP
 12 Northwoods- applicant & owner address/home pictured top left. 
Subject pond in middle of screen. Red circle depicting the area 
shown in following slides. 

Page 9 · open in PDF

VEGETATION 
CONSUMING AREA 
AROUND CULVERT
This past summer with large volumes of rain water from the storms, 
a quite large volume of sediment has accumulated which then 
allowed vegetation to thrive. It is further slowing the normal stream 
flow and could cause a back up around the culvert with a significant 
storm. 

Page 10 · open in PDF

SIDE ANGLE OF 
SUBJECT AREA

Page 11 · open in PDF

Page 12 · open in PDF

THE TASK
 We’d like to remove the sediment depicted inside the red circle of 
this photo. We want to have an excavator come in and remove the 
sediment just enough to remove vegetation and to allow natural flow 
from the culvert at the bottom of the photo. 

Page 13 · open in PDF

CURRENT STATE

Page 14 · open in PDF

INLET AREA 
TO BE 
BLOCKED

Page 15 · open in PDF

PROPERTY 
OVERVIEW
Red boundary line 
indicates approximate 
property line
Green highlighted section 
is the wetlands 
represented by GIS map. 

Page 16 · open in PDF

PRECAUTIONS
We don’t want to hurt wildlife in the pond. Any excavation will be strictly inside the depicted circle and of minimal 
depth in order to remove vegetation and elevated levels of sediment.
The excavator provider is equipped with a spill kit to prevent any potential leak run offs. 
All work will follow “working in the dry” guidance.
We will be mindful to avoid stormy weather patterns. 
We will have the dikes and digging operations proceed as fast as possible to minimize impact of water diversion. 

Page 17 · open in PDF

ACTIONS/PROCESS
We will remove no more than 5 cubic yards of material. 
Process
• We will be inquiring with the fire department to see if they can participate in the lowering of the pond water by 
approximately 2ft. This will aid in digging safety and operations. Water will be pumped downstream.
• We will sandbag with clean sand and burlap sandbags a dike surrounding the immediate worksite. 
• We will then pump out the water from within the diked area into the rest of the pond. 
• We will block with sandbags, the natural inlet for the pond, and pump accumulations of water as needed into the 
main portion of the pond. 
• All removed sediment will be placed temporarily placed away from waterways to dry out. Once dry, it will be 
spread in the existing garden and in small quantities, placed to level out spots in the lawn with grass planted.

Page 18 · open in PDF

FINAL NOTES
Thank you,
This is in conjunction with a Request for review document submitted 8/27/2026 to the Town of Granby, CT. 
This is in regards to the property of 
Nicholas Kimball & Marissa Nasshan
12 Northwoods Rd, North Granby, CT 06060
860-803-2061 cell  (Nicholas Kimball)
Email: kimballni@gmail.com

Page 19 · open in PDF

TOWN OF GRANBY 
Incorporated 1786 
15 North Granby Road 
Granby, Connecticut 06035-2102 
 
November 12, 2026 
 
 
Jonathan Gravel 
c/o Broadleaf Solar, LLC 
575 Fifth Avenue, 24th Floor 
New York, NY 10017 
 
RE: 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – RFR for site 
evaluation and stabilization of erosion and sedimentation issues within a regulated area. 
 
Dear Ms. Fontaine and Mr. Weiner: 
 
Please be advised that on November 12, 2026, the Inland Wetlands and Watercourses Commission 
(IWWC) approved the subject application in accordance with the application and supporting 
documentation received to date.  
 
The following are the conditions of this approval.  
 
1. The Office of Community Development shall be notified at least 48 hours prior to the start of any 
construction activities. 
 
2. Town staff shall inspect installed erosion controls prior to the start of any work that results in earth 
disturbance activities, this includes, but is not limited to, grubbing and stump removal. 
 
3. All work shall be in conformance with the approval and application materials as submitted for this 
Permit Approval. Any modifications to the approved plans must be reviewed and approved by the 
Granby Inland Wetlands and Watercourses Commission or their designated Agent.  
 
4. No materials may be deposited outside of the work area, on the project site, without written approval 
from the IWWC or their designated Agent. 
 
5. Erosion controls shall be maintained until the site has achieved permanent stabilization. Permanent 
stabilization is defined as 70% permanent vegetation covering over 90% of the area. A stockpile of 
erosion controls shall remain on site to prepare controls as necessary. The IWWC shall be notified in 
writing at least 48 hours in advance of erosion controls being removed.  
 
6. Excavated soil shall not be brought off-property without the notification and approval of the Office of 
Community Development. The applicant shall supply the destination in writing for any excavated soil 
removed from the property.  
 
7. This permit is valid for a period of 5 years from the date of issuance. 
 
8. Upon completion of construction and site stabilization, the IWWC shall be notified in writing that work 
is complete, and a final inspection may be completed at that time. 
 
If you have any questions, please call the Office of Community Development at your earliest convenience. 
 
Sincerely, 
 
 
John Laudati 
Granby IWWC Chairman 

Page 20 · open in PDF

8 
TOWN OF GRANBY 
Office of Community Development, Inland Wetlands and Watercourses Commission 
Telephone: (860) 844-5318, www.granby-ct.gov 
Application for Inland Wetlands & Watercourses Activity
Application Fo �Permit □Extension □Modification (Existing Permit/Application #): _________ _ 
□Wetlands Map Amend. equest for Review □Other: _____________ _ 
Property Location and Nearest Intersection: East/northeast of Salmon Brook St (Rt. 10) & Floydville Rd intersection 
Size of Parcel: 215.36 ac Zone: I Map/Lot: 53/78/28 Current Use: _N_u _r _se_ry..;;.... _______ _ 
Applicant's Name: Broadleaf Sol ar, LLC 
Complete Address: 575 Fifth Ave., 24th Fl., New York, NY 10017 
Daytime Phone: (212) 478-0000 Evening Phone: _________ Fax: _________ _ 
Email: jon.gravel@desri.com 
Owner's Name: Broadleaf Solar, LLC 
If the owner is a corporation, or other non-individual entity, include the primary contact information 
Complete Address: 575 Fifth Ave., 24th Fl., New York, NY 10017 
Phone Daytime Phone: (212) 478-0000 Evening Phone: _________ Fax: _________ _ 
Applicant's Representative: _J_o_n _a _th_ a_n_G_r a_v_e_l ________________________  
Complete Address: 575 Fifth Ave., 24th Fl., New York, NY 10017 
Daytime Phone: 207-239-8782 Evening Phone: 207-239-8782 Fax: ___________  
Wetlands Located on Property (in square feet (sq. ft.)): 1 Mil+/- Wetlands to be impacted (sq. ft.): _2 200-SF
Watercourses Located on Property? Yes Name or Type of Watercourse: Unn amed tributaries t ' ok 
Are Proposed Activities Located within the 100 -Year Floodplain? No Floodway? _N_ o ______ _ 
Are there slopes with grades in excess of 15% located on the property? Yes, but not subject to proposed work 
Do Proposed Activities Require Review by the PZC? _N_o ____________________ _ 
*********SEE APPLICATION CHECKLIST ON BACK for MINIMUM APPLICATION REQUIREMENTS********** 
The applicant understands that this application is to be considered complete only when all information and documents required by 
the Commission have been submitted. The undersigned warrants the truth of all statements contained herein and in all supporting 
documents according to the best of his/her knowledge and belief. Permission is granted to the Town of Granby, Inland Wetlands & 
Watercourses Commission, and its agent (s) to inspect the subject land, at reasonable times, during the pendency of an application 
and for the life of the permit. 
1W' Pr/t-� Applicant's Signature: ________ / ___________ Date: __ 29_O_c_t 2_0_2 _6 ______ _
0 ' s· "1,,/2? D 29 0 2026 wner s Ignature: ______ z_.____________ ate: _----::::.;a...=ct:..=;:=-------
Application #: 
Fee amt./Check or Cash: 
Agent Ruling: 
FOR OFFICE USE 
Date Submitted: 
Date of Receipt: 
Date Approved/Denied: 
See Reverse Side for Conditions of Approval or Reason for Denial
0000009208 
Project Name and Brief Description (i.e. residential, agricultural, commercial, number of lots, 
etc.):
Following the erosion and sedimentation control work previously presented to the IWWC, Broadleaf Solar conducted a field survey using transects to 
identify sediment deposits within wetlands and adjacent uplands; this was presented on the October 2026 IWWC meeting. Approximately 2,200 SF of 
sediment deposits were identified within the wetlands. Broadleaf proposes to remove the sediment by hand, using shovels an 5-gallon buckets, with 
spoils placed in stable, vegetated upland areas not subject to runoff. Existing erosion controls will be maintained, and disturbed areas will be allowed 
to revegetate naturally. Refer to the enclosed mapping and mitigation recommendations previously provided to the IWWC in October 2026.

Page 21 · open in PDF

TOWN OF GRANBY 
Incorporated 1786 
15 North Granby Road 
Granby, Connecticut 06035-2102 
 
1 
November 12, 2026 
 
 
 
Forrest Devine 
129 Lovers Lane 
Granville, MA 01034 
 
RE: 37 Hartford Avenue – F. Devine – Permit application for regulated activities in connection with the 
development of a 16-unit apartment building and associated site improvements. 
 
Dear Mr. Devine: 
 
Please be advised that on November 12, 2026, the Inland Wetlands and Watercourses Commission 
(IWWC) Agent approved the subject application in accordance with the application and supporting 
documentation received to date.  
 
The following are the conditions of this approval.  
 
1. Notification Requirements 
a. The Office of Community Development shall be notified at least 48 hours prior to the start of any 
activities. 
b. When barrier erosion controls have been installed prior to earth disturbance activities. 
c. When invasive species have been removed. 
d. When plantings have been installed. 
e. Upon completion of project activities. 
f. Prior to the removal of erosion controls 
 
2. Municipal Inspection 
a. Town staff shall inspect installed erosion controls prior to the start of work that results in earth 
disturbance activities, this includes, but is not limited to, grubbing and stump removal. 
b. Standard inspections of the approved improvements shall be made throughout active 
construction and upon final stabilization of exposed soils to ensure regulatory compliance and 
protection of wetland resource areas. 
c. A site inspection shall be completed to witness that invasive species have been adequately 
removed, please refer to sheet D-6 “Compliance Notes” revised to 8/25/26 for additional invasive 
species control details.  
d. A site inspection shall be completed to document successful installation and survivability of 
proposed plantings.  
 
3. Prior to the start of work, the applicant shall submit a bond in the amount of $5,000 to the Town of 
Granby for payments made to the Town Wetlands Officer for monitoring the development for 
compliance with this approval. Should the costs exceed this amount the applicant will be billed for the 
difference. Any funds not used for the project will be remitted to the applicant at the conclusion of the 
project. As used in this condition, the term Town Wetlands Officer includes any person or firm 
designated by the Director of Community Development for the purposes of monitoring the 
development activities to assure compliance with this approval and the IWWC Regulations. 
 
4. A Mylar copy of the approved plans signed by the IWWC Chair shall be filed on the Land Records in 
the Office of the Town Clerk, prior to the issuance of a building permit.  
 

Page 22 · open in PDF

37 Hartford Avenue – Apartments  
11/12/26 Approval Letter 
 2  
5. All work shall be in conformance with the approval and application materials as submitted for this 
Permit Approval. Any modifications to the approved plans must be reviewed and approved by the 
Granby Inland Wetlands and Watercourses Commission or their designated Agent.  
 
6. Erosion controls shall be maintained until the site has achieved permanent stabilization. Permanent 
stabilization is defined as 70% permanent vegetation covering over 90% of the area. A stockpile of 
erosion controls shall remain on site to prepare controls as necessary. The IWWC shall be notified in 
writing at least 48 hours in advance of erosion controls being removed.  
 
7. Excavated soil shall not be brought off property without the notification and approval of the Office of 
Community Development. The applicant shall supply the destination in writing for any excavated soil 
removed from the property.  
 
8. Only clean fill, free of invasive species, shall be brought on-site. Utilizing on-site fill will reduce, if not 
eliminate the potential for the introduction and potential colonization of new invasive species into this 
area of the watershed.   
 
9. A Mylar copy of the final As-Built Drawing, depicting the approved wetland boundary and limit of 
vegetative clearing; shall be filed on the Land Records in the Office of the Town Clerk, prior to the 
issuance of a Certificate of Occupancy. 
 
10. This permit is valid for a period of 5 years from the date of issuance. 
 
If you have any questions, please call the Office of Community Development at your earliest convenience. 
 
Sincerely, 
 
 
 
John Laudati 
Granby IWWC Chairman 
 

Page 23 · open in PDF

TOWN OF GRANBY 
Incorporated 1786 
15 North Granby Road 
Granby, Connecticut 06035-2102 
 
November 12, 2026 
 
 
 
Forrest Devine 
129 Lovers Lane 
Granville, MA 01034 
 
 
RE: 37 Hartford Avenue – F. Devine – Permit application for regulated activities in connection with the 
development of a 16-unit apartment building and associated site improvements 
 
Dear Mr. Devine: 
 
Please be advised that on November 12, 2026, the Inland Wetlands and Watercourses Commission 
(IWWC) voted to deny the permit application by Forrest Devine for regulated activities in connection with 
the development of a 16-unit apartment building and associated improvements for property located at 37 
Hartford Avenue, Granby. Below are the following reasons for denial. 
 
1. Failure to prove that the short and long- term impacts to the adjacent wetland and 
watercourse are being adequately mitigated.  
a. A wetland and watercourse are located at the base of a steep slope, the slope is 
comprised of primarily sandy soils.  
b. A groundwater seep is located at the base of the slope.  
c. The top of the slope contains a subsurface sewage disposal system with a design 
flow of approximately 2,450 gpd. 
d. The total nitrogen concentration on the site from the Su bsurface Sewage 
Disposal System (SSDS)  was determined by the applicant’s Nitrogen Dilution 
Evaluation dated 7/8/26 to be 7.12 mg/L.  
e. Previous site testimony by Soil Scientist, Steven Danzer memorandums dated 
1/5/24, 2/7/24, and 3/5/24, and his findings regarding the introduction of 
additional nitrogen into a wetland system.  
f. Insufficient testing has been submitted by the applicant to determine groundwater 
conditions as requested as it relates to the proposed SSDS nutrient discharge 
and potential adverse impacts to the adjacent wetlands and watercourse. 
2. Feasible and prudent alternatives to the proposed regulated activity  which would cause 
less or no environmental impact to wetlands or watercourses are available. This may 
include but not be limited to modified development  density, utilization of alternative 
technologies, etc.  
 
If you have any questions, please call the Office of Community Development at your earliest 
convenience. 
 
Sincerely, 
 
 
 
John Laudati 
Granby IWWC Chairman 
 

Page 24 · open in PDF

Outlook
Fw: 142R &186 Case Street Granby Ct. Your file 14501.0003
From Granby Wetlands Agent <wetlandsagent@granby-ct.gov>
Date Tue 11/10/2026 2:11 PM
To Renee Deltenre <RDeltenre@granby-ct.gov>; Abigail Kenyon <akenyon@granby-ct.gov>
2 attachments (1 MB)
Pre-Application Meeting Summary-Scottinaleece LLC-Continued Construction of a Partially Built Dam & Outlet Structure on
Farmland-186 Case St-Granby- 10/19/26-USACE Reference #- NAE-2025-02580 ; Supplement to Memorandum dated August 10,
2026.pdf;
In the spirit of sharing, please see the email below and attached documents as received by DEEP for
inclusion in our record. 
SINCERELY, 
THE GRANBY INLAND WETLANDS AGENT
From: Malinowski, Kathryn <Kathryn.Malinowski@ct.gov>
Sent: Tuesday, November 10, 2026 2:04 PM
To: Granby Wetlands Agent <wetlandsagent@granby-ct.gov>
Subject: RE: 142R &186 Case Street Granby Ct. Your file 14501.0003
 
 
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender
and know the content is safe.
 
Good afternoon Kate,
 
Thank you for sharing the submitted documents with us. I have attached to this email the pre-
application summary email that was sent following the pre-app meeting and the supplemental
memo from P.E. Karl Acimovic for the work completed thus far.
 
I will reach out if we have any new information to share.
 
Sincerely,
 
Kathryn Malinowski
Environmental Analyst II
Water Planning and Management Division

Page 25 · open in PDF

Karl f. Acimovic, P.E. & L.S. 2026-09-08  Page 1 of 7 
 
Supplement to Memorandum dated August 10, 2026 from Karl Acimovic  
to Kathryn Malinowski re: Case Street Dam 
 
================================================================= 
 
Construction Completed to Date: 
 
 From information provided by Matt Reale (Owner) and from an inspection of the 
site, the following data include background and photos of the construction of the dam.  
 
 Construction of the dam embankment started with the excavation of a cutoff trench 
along the center base of the structure. As shown on the following photo, the cutoff trench is 
5 ft. deep and the width is 8 ft. The trench was carried up into the embankment with clayey, 
till material from available onsite sources, compacted in 12-inch lifts. 
 
 
  
Photo 1 – The cutoff trench 
looking westerly toward the 
abutment and access road area. 
Note that the cutoff trench was 
keyed into the abutment on 
each side. 

Page 26 · open in PDF

Karl f. Acimovic, P.E. & L.S. 2026-09-08  Page 2 of 7 
 
 
 
  
Photo 2 – The cutoff trench look-
ing easterly toward the abutment 
and, again, access road continuing 
easterly toward future pasture 
land. 
Photo 3 – A close-up view of the 
cutoff trench, again looking east-
erly toward the abutment. 

Page 27 · open in PDF

Karl f. Acimovic, P.E. & L.S. 2026-09-08  Page 3 of 7 
 
 
 
  
Photo 4 - The low level outlet was sub-
sequently installed along the center 
base of the structure with a concrete 
cutoff or anti-seep collar located just 
downstream of the center of the em-
bankment. 
Photo 5 - The upstream inlet structure 
for the low level outlet showing a base 
slab and reinforcement rising for the 
upper section of the intake. The outlet 
pipe, a 42-inch HDPE with a corru-
gated exterior and smooth interior, is 
protected by an anti-seep collar situ-
ated just downstream of the half-way 
length of the pipe (see previous 
photo). 

Page 28 · open in PDF

Karl f. Acimovic, P.E. & L.S. 2026-09-08  Page 4 of 7 
 
 
 
  
Photo 6 - Another view of the intake, 
showing continued installation of form-
work and reinforcement throughout the 
height of the structure. 
Photo 7 – The base interior of the 
drop inlet, looking in an upstream 
direction, with the drawdown drain 
for the pond on the upper wall and 
the low level 42-inch outlet pipe at 
the base of the photo. 

Page 29 · open in PDF

Karl f. Acimovic, P.E. & L.S. 2026-09-08  Page 5 of 7 
 
 
 
  
Photo 8 – The current dam site look-
ing easterly along the crest and 
downstream slope. The low level 
HDPE discharge pipe is at the right 
center of the photo. 
Photo 9 – Another view of the cur-
rent dam site looking easterly along 
the crest and upstream slope. The 
concrete drop inlet structure is at the 
left center of the photo. Slopes are 
currently stabilized with vegetated 
growth. 

Page 30 · open in PDF

Karl f. Acimovic, P.E. & L.S. 2026-09-08  Page 6 of 7 
 
 
 
Photo 10 – The current dam site look-
ing westerly along the crest and up-
stream slope. The concrete drop inlet 
structure is at the upper right side of 
the photo. 

Page 31 · open in PDF

Karl f. Acimovic, P.E. & L.S. 2026-09-08  Page 7 of 7 
 
 Subsequent to the base embankment construction, the drop inlet with incoming 
pond drawdown pipe and low level outlet pipe was constructed of reinforced concrete us-
ing rebar and 5,000 psi ϐiber-reinforced concrete. The embankment was subsequently 
raised to its current elevation, where its construction has currently stopped pending fur-
ther design and regulatory permitting. It is the intention to raise the intake structure and 
dam embankment an additional 4.5 ft. to their intended height, working with a professional 
engineer familiar with the construction of dams. This will include additional zoned soil ma-
terials on both sides of the dam, with proper compaction, and to an eventual slope of 3H:1V 
seeded and stabilized with grass. In addition, the layout will include an emergency side by-
pass grassed spillway, similar to the concept of past Soil Conservation Service (now USDA) 
guidelines. 

Page 32 · open in PDF

Outlook
FW: 142R &186 Case Street Granby Ct. Your file 14501.0003
From Abigail Kenyon <akenyon@granby-ct.gov>
Date Tue 11/10/2026 2:09 PM
To Renee Deltenre <RDeltenre@granby-ct.gov>
 
 
From: Granby Wetlands Agent <wetlandsagent@granby-ct.gov>
Sent: Tuesday, November 10, 2026 2:08 PM
To: T. Furey <tfurey@fureydonovan.com>; Richard P. Roberts <ROBERTS@halloransage.com>
Cc: Abigail Kenyon <akenyon@granby-ct.gov>; Mike Walsh <mwalsh@granby-ct.gov>; John Laudati
<jlaudati@mlkalaw.com>; Trent Kaisen <kaisen@halloransage.com>; Kenneth R. Slater, Jr.
<Slater@halloransage.com>; Matt Reale <rec6671@comcast.net>; David Lord <dlordsrc@gmail.com>
Subject: Re: 142R &186 Case Street Granby Ct. Your file 14501.0003
 
Attorney Furey and Project Team, 
 
Thank you for your submission, I have gone through the documents and will prepare a memo
with any comments or questions. However, before I do, I want to make sure that there is not a
wetland delineation pre and post disturbance plan with flag numbers as part of the submittal. I
see that Mr. Lord has a couple of blank landscape PDF pages at the end of his documents,
hoping that was the surveyed wetland delineation. He also speaks of wetland flagging in the
field. 
 
The USDA "Wetland Determination" indicates the boundaries define federal wetland boundaries
only, not state or local. Local boundaries are likely to extend beyond federal boundaries due to
the reduction in parameters required to be met to be determined to be a wetland.  In regard to
the USDAS's Wetland Determination, is there an associated report that describes what methods
they used to delineate the wetlands beyond that described in the USDA October 19, 2026
letter? Details like if the flagging was completed in the field, is there associated flagging, when
was the work completed, who did the delineation, how was it put onto the mapping (gps, survey,
aerial interpretation, etc.?)?
 
I look forward to your presentation of this information at the IWWC meeting this Thursday.
 
SINCERELY, 
THE GRANBY INLAND WETLANDS AGENT
 
From: T. Furey <tfurey@fureydonovan.com>
Sent: Monday, November 9, 2026 6:15 PM

Page 33 · open in PDF

Page 34 · open in PDF

Page 35 · open in PDF

Page 36 · open in PDF

Outlook
FW: 142R &186 Case Street Granby Ct. Your file 14501.0003
From Abigail Kenyon <akenyon@granby-ct.gov>
Date Tue 11/10/2026 8:49 AM
To Renee Deltenre <RDeltenre@granby-ct.gov>
7 attachments (8 MB)
Soil Resource David Lord letter re Granby USDA Determinations 11-5-26.pdf; Oct2026_letter_signed from NCRS re delineation.pdf; Oct 26 NRCS Wetland
Determination_Map_ April 2026.pdf; David Lord Response Letter 9-8-26.pdf; CT_GrazingPlan_worksheet_Granby Site_7.2.26.pdf; Copy of
CT_GrazingPlan_worksheet_Granby Site.xls; C.B. A. _Granby Site _ future infrastructure_UPDATE_N.Bak_7.2.26.pdf;
 
 
From: T. Furey <tfurey@fureydonovan.com>
Sent: Monday, November 9, 2026 6:15 PM
To: Richard P. Roberts <ROBERTS@halloransage.com>
Cc: Abigail Kenyon <akenyon@granby-ct.gov>; Granby Wetlands Agent <wetlandsagent@granby-ct.gov>; Mike Walsh <mwalsh@granby-
ct.gov>; John Laudati <jlaudati@mlkalaw.com>; Trent Kaisen <kaisen@halloransage.com>; Kenneth R. Slater, Jr.
<Slater@halloransage.com>; Matt Reale <rec6671@comcast.net>; David Lord <dlordsrc@gmail.com>
Subject: RE: 142R &186 Case Street Granby Ct. Your file 14501.0003
 
 
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
 
Attorney Roberts, Please find attached the following:
 
1. A report form David Lord of Soil Resource Consultants outlining his findings and verifying their consistency with those
of the NRCS. The report speaks for itself but David verified the location of the wetlands, commented on the timber
harvest and the fact it had no adverse impact on the wetlands, commented on the location of the access drive etc.
2. A letter from the NCRS dated October 19, 2026 outlining their findings, their process & goals and again indicating no
adverse impacts to the wetlands resource.
3. A copy of the wetland’s determination map developed by NRCS and confirmed by David Lord.
4. A letter of September 8, 2026 previously presented to the Wetland’s Commission together with testimony from David
Lord indicating the activities are appropriate and providing a detail of what the process will be to develop and maintain
the paddock areas.
5. A copy of the farm plan developed in conjunction with NRCS which describes a phased development of paddocks and
a responsible farming plan required by the NRCS goals and objectives. Please note we have made a part of the record
that the area noted as Section SW is not included at this time. Although a limited liability company owned by the
principal of Scotinleece owns 70% of that parcel we are not including it at this time.
6. A grazing plan worksheet developed by NRCS to provide guidance as paddocks are developed.
 
Please let me know if you have any other questions.
 
 
Timothy W. Furey
Furey, Donovan, Cooney & Dyer P.C.
43 Bellevue Ave
Bristol Ct 06010
(860) 589-4343
 
From: Richard P. Roberts <ROBERTS@halloransage.com>
Sent: Sunday, November 8, 2026 3:11 PM
To: T. Furey <tfurey@fureydonovan.com>
Cc: Abigail Kenyon <akenyon@granby-ct.gov>; Granby Wetlands Agent <wetlandsagent@granby-ct.gov>; Mike Walsh <mwalsh@granby-

Page 37 · open in PDF

1000 ft
N
➤➤
N
Image © 2025 Airbus
Image © 2025 Airbus
Image © 2025 Airbus

Page 38 · open in PDF

Grazing Forage Balance and
Paddock Number Estimator Worksheet
Farm Name: Coal Black Angus
Prepared By:
Date:
5- Enter the type of grazing livestock: Beef (Feeder)
Notes:
6- Enter the Number of grazing livestock: 45
Notes:
7- Enter total acres available and planned 60.0 Acres                                         
     for grazing: Notes:
Dietary Data:
8- Enter average body weight of grazing livestock: 1,200 Pounds                                    
     (Table 1) Notes: avg weight = 1500 for adults 900 for  calves = 1200lbs
9- Enter estimated Dry Matter Intake (DMI) 2.5% DMI                                             
    as a % of body weight):        (Table 2) Notes: used % for stocker and heifer cattle to get an average
10-Calculate Daily DMI for a single animal: 30.0 Estimated Pounds of Dry Matter Intake Per Animal 
     ( 8 ) X ( 9 ) Notes:
11-Calculate Daily DMI for the herd:
     ( 6 ) X ( 10 ) 1350.0 Total Est. Pounds of Dry Matter Required / Day For The Herd
Notes:
Grazing Data:
12-Enter length of desired grazing period in days: 7.0 Days                                          
      (Table 3) Notes:
13-Enter estimated available forage dry matter in 1,200 Pounds per acre per day           
      pounds per acre :    (Table 4) Notes: go in at 8" and remove at 3" on avg density
14-Calculate estimated paddock size: 7.9 Acres                                          
      [( 11 ) / ( 13 )] X ( 12 ) 343,035
 Square Feet
15a-Enter Estimated paddock recovery period 42 Days                                           
        days:                        (Table 5)
15b-Calculate estimated number of paddocks 7 Estimated number of paddocks needed
        needed:       [( 15a ) / ( 12 )] + 1 Notes:
16-Calculate total acres needed for grazing: 55.1 Total estimated acres needed for the grazing plan.
      ( 14 ) / ( 15b ) Notes:
Note:  42 days rest period is the default for 
September.
1 of 2

Page 39 · open in PDF

Grazing Forage Balance and
Paddock Number Estimator Worksheet
Paddock Acres = 7.9
Month  Estimated Rest Days Estimated # of Paddocks Needed
April 15 3
Estimated # of Acres Needed
24.8
Month  Estimated Rest Days Estimated # of Paddocks Needed
May 18 4
Estimated # of Acres Needed
28.1
Month  Estimated Rest Days Estimated # of Paddocks Needed
June 24 4
Estimated # of Acres Needed
34.9
Month  Estimated Rest Days Estimated # of Paddocks Needed
July 30 5
Estimated # of Acres Needed
41.6
Month  Estimated Rest Days Estimated # of Paddocks Needed
August 36 6
Estimated # of Acres Needed
48.4
Month  Estimated Rest Days Estimated # of Paddocks Needed
September 42 7
Estimated # of Acres Needed
55.1
References:    "Introduction To Management Intensive Grazing"        By: Bill Murphy
Estimates of Acres and Number of Paddocks Needed By Month
    "Greener Pastures on Your Side of the Fence"           By: Bill Murphy
    "Pasture Management"                                                    By: Sarah Flack
    "Pasture Condition Score Sheet"                                   By: Jim Cropper
2 of 2

Page 40 · open in PDF

 Connecticut Rotational 
Grazing Plan
CERTIFICATION OF PARTICIPANTS
   Telephone:
   Email Address:
Matt Reale
Coal Black Angus
                          Cover Sheet
This Grazing Plan Has Been Developed For:
2-  Grazing Manager:
1-  Farm Name:
July 2, 20264- Date:
   Farm Contact Address: 97 Daniel Trace Rd. Burlington, CT 06013
Nikki Bak
Prepared By:
   Telephone Number:
3- Planner Name:
nikki.bak@usda.gov
________________________  __________
Matt Reale Coal Black Angus     DATE

Page 41 · open in PDF

Grazing Forage Balance and
Paddock Number Estimator Worksheet
Farm Name: Coal Black Angus
Prepared By: Nikki Bak
Date: July 2, 2026
5- Enter the type of grazing livestock: Beef (Feeder)
Notes:
6- Enter the Number of grazing livestock: 45
Notes:
7- Enter total acres available and planned 60.0 Acres                                         
     for grazing: Notes:
Dietary Data:
8- Enter average body weight of grazing livestock: 1,200 Pounds                                    
     (Table 1) Notes: avg weight = 1500 for adults 900 for  calves = 1200lbs
9- Enter estimated Dry Matter Intake (DMI) 2.5% DMI                                             
    as a % of body weight):        (Table 2) Notes: used % for stocker and heifer cattle to get an average
10-Calculate Daily DMI for a single animal: 30.0 Estimated Pounds of Dry Matter Intake Per Animal 
     ( 8 ) X ( 9 ) Notes:
11-Calculate Daily DMI for the herd:
     ( 6 ) X ( 10 ) 1350.0 Total Est. Pounds of Dry Matter Required / Day For The Herd
Notes:
Grazing Data:
12-Enter length of desired grazing period in days: 7.0 Days                                          
      (Table 3) Notes:
13-Enter estimated available forage dry matter in 1,200 Pounds per acre per day           
      pounds per acre :    (Table 4) Notes: go in at 8" and remove at 3" on avg density
14-Calculate estimated paddock size: 7.9 Acres                                          
      [( 11 ) / ( 13 )] X ( 12 ) 343,035
 Square Feet
15a-Enter Estimated paddock recovery period 42 Days                                           
        days:                        (Table 5)
15b-Calculate estimated number of paddocks 7 Estimated number of paddocks needed
        needed:       [( 15a ) / ( 12 )] + 1 Notes:
16-Calculate total acres needed for grazing: 55.1 Total estimated acres needed for the grazing plan.
      ( 14 ) / ( 15b ) Notes:
Paddock Acres = 7.9
Month  Estimated Rest Days Estimated # of Paddocks Needed
April 15 3
Estimated # of Acres Needed
24.8
Month  Estimated Rest Days Estimated # of Paddocks Needed
May 18 4
Estimates of Acres and Number of Paddocks Needed By Month
Note:  42 days rest period is the default for 
September.
2 of 7

Page 42 · open in PDF

Grazing Forage Balance and
Paddock Number Estimator Worksheet
Estimated # of Acres Needed
28.1
Month  Estimated Rest Days Estimated # of Paddocks Needed
June 24 4
Estimated # of Acres Needed
34.9
Month  Estimated Rest Days Estimated # of Paddocks Needed
July 30 5
Estimated # of Acres Needed
41.6
Month  Estimated Rest Days Estimated # of Paddocks Needed
August 36 6
Estimated # of Acres Needed
48.4
Month  Estimated Rest Days Estimated # of Paddocks Needed
September 42 7
Estimated # of Acres Needed
55.1
References:    "Introduction To Management Intensive Grazing"        By: Bill Murphy
    "Greener Pastures on Your Side of the Fence"           By: Bill Murphy
    "Pasture Management"                                                    By: Sarah Flack
    "Pasture Condition Score Sheet"                                   By: Jim Cropper
3 of 7

Page 43 · open in PDF

              For:
Farm Name: Coal Black Angus
Grazing Manager: Matt Reale
Contact Address: 97 Daniel Trace Rd. Burlington, CT 06013
Planning Assistance Provided By: Nikki Bak
FARM GRAZING GOALS: The goal of the farm operation is to increase grass forage production and 
yield, forage quality and diversity and provide for grass-forage feeding with 
minimal effort and cost.  This prescribed grazing plan will protect the soil 
and water and the  farm’s natural resources, improve forage production and 
herd health. 
LIVESTOCK GROUP 1
Number of Grazing Livestock: 45
Type of Grazing Livestock: Beef (Feeder)
Grazing Livestock Average Weight: 1200
Pasture Acres Available Group 1: 60.0
Grazing Acres Needed (Group 1): 55.1
LIVESTOCK GROUP 2
Number of Grazing Livestock:
Type of Grazing Livestock:
Grazing Livestock Average Weight:
Pasture Acres Available Group 2:
Grazing Acres Needed (Group 2):
55.1
Acres Needed
INVENTORY DATA
FARM INFRASTRUCTURE: Currently there is no infrastructure on the property. A 3 acre pond on site 
will to be used as a water source for cattle. The farm has plans to build a 
run-in shed on the western side of the property and build barns on the 
eastern side. Power will be brought to the site to the future barn. Access 
roads are essential to stablize the ground to bring livestock and equipment 
back and forth from the far pastures to the planned buildings. Fencing is 
needed along the access roadways to keep livestock along the roads 
during movement. 
PADDOCK INVENTORY: The primary limitations of the soils in this grazing system include concerns 
with stoniness, areas of high runoff without adequate vegetative cover, and 
areas of bedrock with potential summer moisture deficiency.
FORAGE INVENTORY DATA: Land is currently being converted from a forest setting to pasture. After 
taking soil samples and applying the recommended soil amendments, seed 
new pastures with a forage mix. 
Total Acres Needed For The 
Grazing Plan:
GRAZING PLAN
Page 4 of 7

Page 44 · open in PDF

              For:
GRAZING PLAN
LIVESTOCK EXCLUSION 
REQUIREMENTS:
Livestock will not have access to flowing surface waters or standing water 
in wetlands or low areas anytime water is present unless it is by controlled 
access according to NRCS conservation practices.  For low areas this is 
usually only during the early spring (March, April and May).  This will help 
maintain these fields as productive pasture and prevent potential polluted 
runoff from reaching surface waters (streams) or groundwater.  The 
livestock will only be allowed to access these fields when all surface water 
has drained away.  This will improve water quality and improve animal 
health.  
MANURE AND NUTRIENT 
MANAGEMENT:
Management of the manure and nutrients will be done primarily by the 
rotation of cattle and with proper placement of water tubs and supplied 
minerals.  Soil test(s) will be taken to determine the economic threshold of 
applying fertilizer to increase production.  The pH levels may also indicate 
lime is needed to neutralize the soil.  Soil tests should be taken every three 
years.  Apply nitrogen when needed to increase production for fall pasture.  
Implementation of the rotational grazing system will spread manure 
throughout the pasture.  Sacrifice or winter paddocks will be seeded to a 
cover crop for summer pasture and to take up excess nutrients or will be 
excluded from grazing until the forage has completely recovered.
EXISTING OR PLANNED WATER 
SYSTEM:
The watering system will include new pond as the water source, with pump,  
pipeline, and movable water tubs with floats.    
Emergency Watering: In the case of an emergency, such as power failure, 
pump failure, etc. the livestock will be provided water by:  
a) providing open access to surface waters, however, access will 
immediately cease as soon as the emergency is over.
b) hauling water from existing water sources to grazing animals.
EXISTING OR PLANNED FENCES: Exterior Fencing:  The  proposed exterior fence will be maintained to 
prevent grazing livestock from getting out of the pasture and into the 
road,neighboring property, or into water sources.  Interior fences can be 
used to break up pastures into smaller paddocks to allow for rotational 
grazing. 
ADDITIONAL PLAN  INFORMATION
Page 5 of 7

Page 45 · open in PDF

              For:
GRAZING PLAN
DROUGHT CONTINGENCY PLAN: The “summer slump” for cool season grasses and legumes (very slow or no 
growth) occurs as summer air temperatures increase with simultaneous 
decreases in rainfall.  During this period, the manager will need to 
supplement with forages (hay) at this time and should follow a plan to meet 
the requirements of the livestock while still protecting the plants until this 
summer slump ends.  The following Drought Contingency Plan will be used:
During periods of drought when forage production is significantly reduced, 
the livestock manager will:
• reduce herd size or increase paddock size, OR
• rotate the livestock through the grazing system at a “slower” than normal 
pace, OR
• put the livestock in a “sacrifice” paddock to take the abuse while other 
paddocks rest and avoid forage damage, OR
• feed a supplemental forage supply such as hay in a sacrifice paddock until 
the drought ends.
A long drought may require all of the above to be implemented. 
MUD CONTINGENCY PLAN: When grazing conditions are very wet the following Mud Contingency Plan 
will be used. 
• Rotate the livestock through the grazing system at a “faster” than normal 
pace, or 
• put the livestock in a “sacrifice” paddock of favorable soil type to take the 
brunt of the abuse to allow other paddocks a chance to avoid damage, or
• change the paddock order in the rotation schedule to avoid muddy 
situations
There may be situations where all three of the above will be implemented 
during a long wet period.
WINTER PLANS: After the grazing season is complete and winter weather moves into the 
area, the livestock will be managed in the following manner:
a) Livestock will be rotated among winter pasture/paddock areas near the 
headquarters.   Feed will be brought to the livestock at these locations.  A 
freeze-proof water source should be provided.  The winter sacrifice 
paddocks will be chosen due to low runoff potential, level topography and 
well-drained soils.  The paddocks will be soil tested every year after 
livestock move out to the other paddocks in the spring.
b) Livestock will be confined and the manager will store the manure from 
(November 1 to April 1, e.g.) in an approved stacking area.
Page 6 of 7

Page 46 · open in PDF

              For:
GRAZING PLAN
EXCESS PASTURE PLANS: The fields will be hayed, or at least clipped, if the forage is growing at rates 
that exceed grazing rotation of the livestock.  By haying the excess forage 
off of the fields during peak times, the forage production of the whole 
system will be maintained. If pasture is not accessible by tractor, priority 
should be given to graze those areas first. The grazing system should be 
created with priority given to graze inaccesible pastures. Thus, if pastures 
are getting ahead of the grazing system, accessible fields can be easily 
clipped and/or hayed, and forage waste is minimized.
GRAZING SCHEDULE:
Livestock Group 1
GRAZING DAYS / PADDOCK: 7
REST PERIOD / PADDOCK: 42
PLANNED PADDOCK SIZE AC: 7.9
PLANNED # OF PADDOCKS 7
Livestock Group 2
GRAZING DAYS / PADDOCK:
REST PERIOD / PADDOCK:
PLANNED PADDOCK SIZE AC:
PLANNED # OF PADDOCKS:
MONITORING AND RECORD 
KEEPING PLANS:
The key forages will be measured by weekly observation, by weekly grazing 
stick checks, or by other means to note changes in plant composition, plant 
diversity, yield, and plant density.  Records of weekly observations will be 
documented and retained, as well as records of livestock movement 
through the grazing system.
PLANNED PRACTICE 
INFORMATION:
Optimum Average Height to Graze Forage Species present:         8 inches
Maximum Average Height to Graze (taller than this make hay):   12 inches 
Minimum Average Grazing Height (do not graze lower than):        3 inches
          Note:  Grazing should begin in a different paddock at the beginning of each grazing season.  
Page 7 of 7

Page 47 · open in PDF

Wetland Delineations     Wetland Impact Evaluations     Environmental Planning  
 
 
Soil  Resource Consultants 
       P.O. Box 752                     Meriden, CT 06450 
 
                                                   May 13, 2026 
                   
                                                                                             SRC Job No. 26-30     
Matt Reale 
SCOTTINALEECE, LLC 
96 Danial Trace 
Burlington, CT 06013 
                 
Dear Mr. Reale: 
  
Re: Responses to IWC Requests from August Hearing - 142R & 186 Case Street 
       - Granby, CT   
 
At the request of the Granby Inland Wetland Commission at their August meeting, I have 
prepared the following information. 
 
Existing Conditions Relative to Soil Erosion and Sedimentation 
I visited the site on August 24th to study the existing site conditions relative to potential soil 
erosion and sedimentation concerns.  The attached site photos are indicative of the present 
conditions focusing on the amount of ground cover vegetation.  Very little to no open bare 
ground was observed.  Vegetation density is high and diverse.  In addition, many areas that were  
apparently used during the timber activities are presently covered by layers of tree branches and 
limbs.  This ground cover material acts as a barrier to soil erosion and the transport of any loose 
soil sediments.  I saw no indications within the proposed paddock areas of soil movement. 
 
No further remediation of these proposed paddock areas is required at this time. 
 
The existing dam structure and side slope areas are in need of additional seeding to protect these 
areas from E & S issues over the winter.  I recommend a heavy seeding of the approach areas to 
the dam and both sides of the existing dam berm with annual/cereal rye grass.  This type of grass 
is ideal for providing quick, dense ground cover to protect these areas over the winter.  Annual 
rye is especially appropriate at this time of the year as it will continue to grow when ever the 
temperature is above 45 degrees. 
 
Existing Wetlands in Paddock Areas 
The wetlands and watercourse boundaries within the proposed paddock areas have been flagged. 
Areas previously indicated on soil survey maps or those provided by NRCS were field 
investigated by SRC.  The two (2) small wetland areas indicated by a star shaped symbol were 
found to be off site to the south based on survey located property lines.  It is not uncommon for 
large scale soil mapping to be generally located.  Soil survey mapping currently utilizes the same 
map unit areas (and scale of contained in the 1955 USDA Soil Survey (1951 aerials) publication 
with a later date color photo base.    
 
 

Page 48 · open in PDF

Wetland Delineations     Wetland Impact Evaluations     Environmental Planning  
 
 
                 2 
Photo #1 – View of Existing Density of Vegetative Cover 
 
 
Photo #2 – Close Up View of Ground Cover Interspersed with Surface Rocks 
 

Page 49 · open in PDF

Wetland Delineations     Wetland Impact Evaluations     Environmental Planning  
 
 
                     3 
Wetland areas flagged in the field are identified by pink plastic ribbons with “Wetland 
Delineation printed on them.  These boundaries will be used to field demarcate the associated 
Upland Review 0ne (URZ) that is to be left undisturbed.  The outside edge of the IURZ will 
form an exclusive zone for livestock within the associated paddock area. 
 
The combination of original soil map unit scale of 1:20000, enlarged in scale to match the later 
2022 updated color aerial photography scale of 1:6,510 introduces a degree of cartographic error 
where the lack of any ground proofing can shift the actual locations of the individual map units.    
 
Grazing Paddock Creation 
Twelve paddock areas are proposed to the east of the proposed dam site.  These paddock areas 
are intended to allow for rotational grazing of cattle on a long term basis.  The paddock areas 
will have long term grazing grasses established into them.  Numerous trees will be preserved in 
the paddock areas to provide shade for the animals.  SRC will be onsite to supervise the mark-out 
of URZ limits and the beginning of clearing and grading activities for the paddock subareas. 
 
The basic sequence for paddock establishment is as follows: 
 
 1. Existing ground cover vegetation will be removed from 2-3 paddock subareas. 
 
 2. Large stones, tree limbs, and branches would be removed from the work areas by  
                machines. 
 
 3. The cleared earthen surface will be graded and smoothed by machines. 
 
 4. Soil testing will determine what soil amendments are needed to be applied to create a  
                suitable seeded bed for the proposed pasture grasses. 
 
 5. Seeding of the paddock areas will conform to the manufacturer/suppliers  
                specifications. 
  
At this point, the newly seeded paddock will be left to grow-in.  A minimum of two weeks will 
be attained or two (2) inches of new grass growth establishment before this sequence can be 
stared on the next 2-3 paddock subareas. 
 
A minimum monthly reporting cycle will be established to allow for timely updates to the 
Granby Inland Wetland Commission. 
 
If you have any questions regarding this update report, please contact me.     
 
Sincerely, 
 
David H. Lord 
Certified Soil Scientist 
& Environmental Consultant 
 
cc: Granby IW Office 

Page 50 · open in PDF

Wetland Delineations     Wetland Impact Evaluations     Environmental Planning  
 
 
Photo #3 –  Northerly View of Existing Ground Cover & Lack of any E & S Issues  
 
Photo #4 –  Soil Boring Observation in Easternmost Wetland Symbol on Soil Survey Map 
 

Page 51 · open in PDF

Wetland Delineations     Wetland Impact Evaluations     Environmental Planning  
 
 
 
 
Potential Paddock Configuration & Existing Access Rd. 
From Grazing Plan by NRCS & Cons. District 
 

Page 52 · open in PDF

660 0 660330
Feet
Scale: 1:3,200
¯
This certified wetland determination has been conducted for the purpose of implementing the wetland conservation
provisions of the Food Security Act of 1985, as amended. No determination is made or implied in the unlabeled
portions of the map. If land manipulations are planned in unlabeled areas which do not have previous determinations,
a new determination should be requested.
USDA is an equal opportunity provider, employer, and lender.
Site_CLU_CWD
8
NW
7.12 ac
8
NW
0.20 ac
8
W
0.52 ac
8
W
0.14 ac
8
W
0.15 ac
16
NW
26.62 ac
16
NW
6.21 ac
16
W
5.77 ac
16
W
0.33 ac
16
NW
6.61 ac
16
NW
6.58 ac
16
NW
2.22 ac
16
W
3.54 ac
16
W
0.82 ac
16
W
0.38 ac
17
NW
2.90 ac
17
W
0.07 ac
17
NW
0.02 ac
 Image: VANTAR Satellite Photo October 2025
Customer: Coal Black Angus Farm LLC
Administrative County: Capitol
Geographic County: Capitol
Tract: 6248
Farm: 2380
Wetland Determination
Map Creation Date: 4/8/2026

Page 53 · open in PDF

 
 
 
 
 
 
Natural Resources Conservation Service 
344 Merrow Road, Suite A 
Tolland, CT 06084 
 
USDA is an equal opportunity provider, employer, and lender. 
October 19, 2026 
 
Matthew Reale 
Coal Black Angus Farm LLC 
96 Daniel Trace 
Burlington, CT 06013-1533 
 
SUBJECT: Clarification of the Food Security Act wetland determination and labels on Tract 6248  
 
Dear Matthrew Reale, 
 
USDA-Natural Resources Conservation Service (NRCS) issued a technical determination on 
Capitol Planning Region Tract 6248 on April 8, 2026, that was made in accordance with the 
wetland conservation provisions of the Food Security Act of 1985, as amended.  That 
determination was made in response to the completion of form AD-1026 received by NRCS on 
09/26/2025.  The specific areas determined on the tract included fields west of (and not 
adjacent to) the pond/dam, as well as forested areas east of (and not adjacent to) the 
pond/dam.  The pond/dam area and immediate vicinity were not included in the technical 
determination. 
 
The determination included areas labeled nonwetland and wetlands.  Nonwetlands are areas 
that do not contain a wetland (as defined in the Food Security Act of 1985, as amended).  
Wetland-labeled areas are defined as areas that meet the criteria for hydric soils, hydrophytic 
vegetation, and wetland hydrology and have not been manipulated by altering hydrology 
and/or removing woody vegetation, including stumps.  Had wetland hydrology been removed 
or stump removal been observed in any areas meeting the definition of a wetland, those areas 
would have been labeled a Converted Wetland.  Converted wetlands are wetlands that, after 
December 23, 1985, have been drained, dredged, filled, leveled, or otherwise manipulated 
(including the removal of woody vegetation or any activity that results in impairing or reducing 
the flow and circulation of water) for the purpose, or to have the effect of making the 
production of, an agricultural commodity possible. The issued technical determination does not 
contain Converted Wetland -labeled areas on Tract 6248.  Further, most of the wetland-labeled 
areas in the determination were not manipulated by any timber removal.  The minority of 
wetland areas that had timber harvested were limited in scope and stumps were nearly all left 
in place. Likewise, isolated wetland crossings for logging traffic were temporary and best 
management practices such as poled fords were observed during field activities. 
 
The functions and values of the wetland-labeled areas are assessed during Food Security Act 
wetland determinations where a wetland conversion has occurred or is intended to occur.  In 
these cases, the purpose of the wetland functional assessment would be to develop a 
restoration or mitigation plan to offset losses of wetland function and/or value.  However, 
because no conversion of wetlands occurred in the determined areas of tract 6248, the wetland 

Page 54 · open in PDF

 
 
 
 
 
 
Natural Resources Conservation Service 
344 Merrow Road, Suite A 
Tolland, CT 06084 
 
USDA is an equal opportunity provider, employer, and lender. 
functions and values did not need to be assessed by NRCS.  Because manipulations to wetlands 
were limited to some isolated areas of woody vegetation harvest (but not stump removal), with 
expected woody regeneration the net change to wetland functions and values would be 
essentially null. 
 
You also asked for clarification if the farm road approaching the pond/dam area had any 
impacts on wetland areas on the determination.  Figure 1 shows the proximity of any wetland-
labeled areas in the determined areas to the farm road, visible in the LiDAR hillshade basemap 
and emphasized with a red line. 
 
 
Figure 1Map showing farm road and nearby wetland determination boundaries 
Wetland-labeled areas near the north of road either drain to the north, and away from the 
road, or where drainageway flow paths are directed downslope to the east, the area became 
too steep to support wetland hydrology. 
 
Hopefully this letter clarifies the wetland determination labels, scope of work, and any other 
questions you had in regard to this determination.  
 
Sincerely, 
 
 
 
Jacob Isleib, State Soil Scientist 
USDA-NRCS Connecticut 

Page 55 · open in PDF

 
Soil  Resource  Consultants 
P.O. Box 752                     Meriden, CT 06450 
 
                                                                                              November 5, 2026 
                   
                                                                                             SRC Job No. 25-30        
 
Matt Reale 
c/o SCOTTINALEECE, LLC 
96 Daniel Trace 
Burlington, CT 060013  
                 
Dear Mr. Reale: 
  
Re: Site investigation for Wetland Impact Evaluation – 142R and 186 Granby, CT   
 
At your request, I have completed a recent onsite investigation of this site.  The areas of the site 
investigated extended from the frontage along Case Street westerly to the approximate limits of 
the intended cow grazing paddocks. The purpose of my investigation was to identify and 
delineate the onsite inland wetlands and watercourse boundaries in the extreme westerly portion 
of this property.   relative to the proposed pond area and the associated access drive.  The field 
work was completed on October 26, 2026.  In addition to the two of us, your attorney, Timothy 
Furey accompanied us on the investigation of your property relative to the cow paddocks. 
 
Additionally, we looked at the existing conditions of several areas of your property where the 
Granby Inland Wetland Commission has raised questions and requested further information    
The following are my observations, comments, recommendations, and conclusions.  
 
 1. I have utilized the USDA NRCS “Wetland Determination” mapping information compiled by 
     them as part of their wetland determination for compliance with the Food Security CT of  
    1985 and to maintain your eligibility for USDA programs.  This determination of wetlands,  
    non-wetlands and existing wetland characteristics as well as wetland functions and values was  
    prepared in response to your completion and submission of USDA form AD-1026 on 
    September 26, 2025.  The findings of this determination are contained in the USDA letter of  
    October 19, 2026.   
 
 2. The above determination by NRCS states that no wetland areas on your property have been  
     altered either in character or wetland “functions and values”.  On page 2 of this letter the  
     USDA states “Because manipulations to wetlands were limited to some isolated areas of  
     woody vegetation harvest (but not stump removal), with expected woody regeneration the 
     net change to wetland functions and values would be essentially null”. 
 
 3. My own field investigation on 10-9-26 has confirmed their determination and I am in  
     agreement with their conclusions as to the character and extent of wetland resources in the  
     areas of the proposed grazing paddocks.  The extent of wetland within the proposed grazing 
     areas is shown on their drawing which was included with their 10-19-26 letter. 
 
Wetland Delineations     Wetland Impact Evaluations     Environmental Planning 

Page 56 · open in PDF

 
            2  
 
       4. I believe that the Forestry section of CT DEEP has reviewed the timber harvesting  
          activities and are of the opinion that the work was appropriately completed and the site is  
          stabilized.  I fully concur that no wetland areas were adversely impacted.  Slash piles are  
          located outside the areas of any wetlands.  These slash piles provide important wildlife  
          habitat functions such as cover protection ab nesting sites.  The also provide a degree of  
          soil stabilization and sedimentation protection.  
 
      5. The issue of the location and construction of the farm access drive extending from Case  
          Street eastward toward the area of the proposed dam has been thoroughly evaluated by 
          SRC.  The access drive is located along the southern side of the property and does not flow  
          to or encroach upon any onsite wetlands.  The southern most tips of the three (3) wetlands  
          depicted on the USDA NRCS map do not intersect with the existing access drive.  The  
          southern limit of the 0.52 ac. wetland is more than 15 feet from the closes point along the 
          access drive which has been located in an area where this wetland tip and the southern  
          property line narrow.  
 
          Furthermore, any excess surface water flows from this wetland does not reach the access  
         drive.  Surface topography directs storm flows generally to the north away from the access  
         drive. 
 
          The materials used to cover the surface of the access drive are appropriate for the intended  
         frequent passage back and forth of livestock as detailed on the grazing plan.  The existing  
         surface material provides an all-weather, durable surface for its intended use. 
 
     6. The wetland limits associated with the proposed pasture grazing areas have been marked  
         with pink plastic ribbons with the printed lettering “WETLAND  DELINEATION”. 
 
     7. The USDA NRCS has developed in conjunction with you a thoughtful and detailed grazing  
         plan for the rotational grazing of your land.  It appropriately protects wetland resources  
         with its phased development of the paddock areas and measures to protect the wetland  
         resources. 
 
     8. The pond location is appropriately located based on the natural topography of the site.   
         This location impacts the existing wetland watercourse resource at point where it narrowed  
         to approximately 15 feet wide.  Alternative locations north or south would have increased  
         the amount of wetland watercourse area impacts.  The selected location also provides a  
         significant amount of buffering from any animal waste generated from the livestock. 
  
If you have any questions regarding this report, please contact me.    
 
Sincerely, 
 
David H. Lord 
Certified Soil Scientist 
& Environmental Consultant 
 
        Wetland Delineations     Wetland Impact Evaluations     Environmental Planning  

Page 57 · open in PDF

TOWN OF GRANBY 
Incorporated 1786 
15 North Granby Road 
Granby, Connecticut 06035-2102 
 
Revised 11/5/26 
 
Inland Wetlands and Watercourses Commission  
Request for Review Guidelines 
November 12, 2026 
 
 
1. Complies with Sections 4.1 and 4.2 of the Granby IWWR. 
a. 4.1 (d) What is a significant amount of material as presented in 4.1(d) of the IWWR? Under 5 
yards, based on quality of wetland per Agent’s discretion.  
2. No work within a mapped wetland. If so, the absence of jurisdictional wetlands within the project area 
must be confirmed by a qualified Soil Scientist. The IWWC Agent may determine that a regulated 
wetland resource area boundary does not need to be delineated at their discretion. This 
determination shall be substantiated by field observations.  
3. If work is within 25 feet of the potential jurisdictional wetland boundary, it shall be defined for review in 
the field by the IWWC Agent. 
4. No heavy machinery or extensive excavation is required for work. 
5. The IWWC Chairperson or Agent may make determinations on behalf of the IWWC in accordance 
with these guidelines. All determinations shall be reported to the IWWC at their next regularly 
scheduled meeting. 
6. Any activity in excess of these RFR Guidelines shall be referred to the IWWC for a determination.  
 