Towns / Granby / Inland Wetlands & Watercourses Commission / Oct 14, 2026
Inland Wetlands & Watercourses Commission, Oct 14, 2026
Granby Inland Wetlands & Watercourses Commission Hide agendas that already have minutesDocuments
| Type | Document | Pages | Open |
|---|---|---|---|
| minutesminutes | IWWC Minutes | 5 | PDF download · town site |
| agenda | IWWC Agenda | 1 | PDF download · town site |
| packetpacket | IWWC Meeting Packet Not attached: this packet is 30 MB, too large to host here. Use the town site link. |
129 | town site |
Summary of the minutes
AI-generated summary. Each line links to the PDF page it came from; check it before relying on it.
Read the official minutes (PDF, 5 pages) The PDF is the record; this summary is a guide to it.
The Commission approved the September 9, 2026 minutes as amended, closed the public hearing on 37 Hartford Avenue and continued it to the next regular meeting, and approved several requests for review and permit applications, including 199 Barn Door Hills Road and 45 Barkhamsted Road as as-of-right determinations. The 7 Laurel Drive permit was approved 4-1-0 and the 53 West Granby Road walking path permit was approved 6-0-0, while the 12 Northwoods Road request, the 90 Salmon Brook Street item, and the 142R/186 Case Street update were continued.
Decisions (10) · all reported votes
- Approval of September 9, 2026 Meeting Minutes
Approved as amended (change 'shall connect' to 'should connect' on page 2; convert 'K. Bednaz…' sentence into item #7c)
Vote: Motion by S. Okie, second by B. Schmitt, voted 6-0-0 · p. 1 - 37 Hartford Avenue – F. Devine – Permit application for regulated activities (16-unit apartment building)
Public hearing closed at 7:46 p.m. and application continued to the next regular meeting
Vote: Motion by D. Tolli, second by F. Jones, voted 6-0-0 · p. 1, p. 2 - Agenda amendment to discuss Item #4a and Item #6B simultaneously
Agenda amended
Vote: Motion by D. Tolli, second by N. Dethlefsen, voted 6-0-0 · p. 2 - 12 Northwoods Road – N. Kimball and M. Nasshan – RFR to conduct pond maintenance within a regulated area
Request for continuance granted and Request for Review continued to the next regular meeting
Vote: Motion by F. Jones, second by S. Okie, voted 6-0-0 · p. 2 - 199 Barn Door Hills Road – J. Lambert c/o Lambert's Lawn Care – RFR for pond and culvert maintenance, plantings, and invasive species management
Approved as an As of Right Determination per IWWC Regulations Section 4.1.d, limited to stabilization of the site, invasives removal, drainage, and boulder placement; underground electrical conduit and water line for fountain require a permit application
Vote: Motion by J. Laudati, second by S. Okie, voted 6-0-0 · p. 2, p. 3 - 45 Barkhamsted Road – N. Higley – RFR to excavate and remove debris from front yard and reestablish lawn within a regulated area
Approved as an As of Right Determination per IWWC Regulations Section 4.1.d
Vote: Motion by J. Laudati, second by S. Okie, voted 6-0-0 · p. 3 - 7 Laurel Drive – C. Fontaine and R. Weiner – Permit request for prefabricated shed, drainage piping, tree removal, split-rail fence and lawn restoration within a regulated area
Application and draft approval letter approved as amended
Vote: Motion by B. Schmitt, second by N. Dethlefsen, voted 4-1-0 (D. Tolli opposed) · p. 3, p. 4 - 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Agent Report update re: Conducting a Regulated Activity without a valid IWWC Permit
Agenda item continued to the next regular meeting
Vote: Motion by N. Dethlefsen, second by B. Schmitt, voted 5-0-0 · p. 4 - 53 West Granby Road and 215 Salmon Brook Street – Town of Granby – Permit application to construct a walking path and associated improvements within a regulated area
Application and draft approval letter approved as presented
Vote: Motion by S. Okie, second by D. Tolli, voted 6-0-0 · p. 5 - Adjournment
Meeting adjourned at 9:50 p.m.
Vote: Motion by S. Okie, second by N. Dethlefsen, voted 6-0-0 · p. 5
Also discussed (5)
- Recusal of J. Laudati: J. Laudati recused at 7:49 p.m. · p. 2
- 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – RFR for site evaluation and stabilization of erosion and sedimentation issues: Application received and continued to the next regular meeting; staff noted it must be a permit request with submittal of the corresponding fee · p. 4
- Recusal of J. Laudati: J. Laudati recused at 9:21 p.m. · p. 4
- 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – RFR to establish a cattle farm with paddocks, run-in sheds, underground electrical conduit, etc.: Tabled per the request of applicant representative Attorney Furey · p. 5
- Recess: Commission took a 4-minute recess at 9:43 p.m.; J. Laudati re-seated at 9:43 p.m. · p. 5
Summary of the agenda: IWWC Agenda
AI-generated summary.
This is the Granby Inland Wetlands and Watercourses Commission agenda for its October 14, 2026 regular meeting. It lists items on the agenda only, with no votes or outcomes recorded yet.
On the agenda (11)
- Action on the September 9, 2026, Meeting Minutes · p. 1
- Public Hearing: 37 Hartford Avenue – F. Devine – Permit application for regulated activities in connection with development of a 16-unit apartment building and associated site improvements (opened/continued from 7/8/26) · p. 1
- Show Cause Hearing: 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a regulated activity without a valid IWWC Permit (opened/continued from 7/8/26) · p. 1
- Request for Review: 12 Northwoods Road – N. Kimball and M. Nasshan – RFR to conduct pond maintenance within a regulated area (received/continued from 9/9/26) · p. 1
- Request for Review: 199 Barn Door Hills Road – J. Lambert c/o Lambert's Lawn Care – RFR to conduct pond and culvert maintenance, plantings, and invasive species management within a regulated area · p. 1
- Request for Review: 45 Barkhamsted Road – N. Higley – RFR to excavate and remove debris from front yard and reestablish lawn area within a regulated area · p. 1
- Permit Request: 53 West Granby Road and 215 Salmon Brook Street – Town of Granby – Permit application to construct a walking path and associated improvements within a regulated area (received/continued from 9/9/26) · p. 1
- Permit Request: 7 Laurel Drive – C. Fontaine and R. Weiner – Place a prefabricated shed on crushed stone, install drainage piping, remove pine trees, install split-rail fence and restore lawn within a regulated area (received/continued from 9/9/26) · p. 1
- Request for Review: 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – RFR for site evaluation and stabilization of erosion and sedimentation issues within a regulated area · p. 1
- Agent Report and Correspondence: Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a regulated activity without a valid IWWC Permit · p. 1
- Request for Review: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – RFR to establish a cattle farm with paddocks, run-in sheds, underground electrical conduit, etc. · p. 1
Full text of the documents
View the minutes PDF on this page (IWWC Minutes)
Text of the minutes (IWWC Minutes, 5 pages)
Page 1 · open in PDF
1 MEETING MINUTES Town of Granby Inland Wetlands and Watercourses Commission Wednesday, October 14, 2026, at 7:00 p.m. PRESENT: Nick Dethlefsen, David Tolli, Sue Okie, John Laudati, Barbara Schmitt, and Fred Jones ALSO PRESENT: IWWC Agent Kate Bednaz and Land Use Coordinator Renee Deltenre (Zoom) 1. Call to Order Chair J. Laudati called the meeting to order at 7:00 p.m. 2. Action on the September 9, 2026, Meeting Minutes ON A MOTION by S. Okie seconded by B. Schmitt, the Commission voted 6-0-0 to approve the September 9, 2026, meeting minutes as amended to reflect the following changes: a. Top of page 2, change “shall connect” to “should connect”. b. Middle of page 4, convert sentence starting with “K. Bednaz…” into item #7c. 3. Public Hearings a. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in connection with the development of a 16-unit apartment building and associated site improvements. Professional Engineer Rebecca Li was present to discuss the application, along with applicant Forrest Devine and Attorney Rachel Fancy. R. Li ran through the application timeline and documentation submitted to date, noting that a thorough and good faith effort has been made to address all comments/concerns. F. Devine submitted three documents that contain findings and supporting documentation related to the intervenor’s Professional Engineer Steve Trinkaus and read his letter into the record. Public Comment Attorney George Schober, representative for abutting property owner Peter Voskowsky, spoke in defense of Professional Engineer Steve Trinkaus and claims that F. Devine’s letter and comments are irrelevant. Attorney Schober claims that the application is incomplete and no documentation regarding the impact of stormwater/effluent has been provided. It was stated that feasible and prudent alternatives consist of connecting to public sewer or reducing the unit count. Professional Engineer Steve Trinkaus responded to comments and documentation provided by Forrest Devine. He noted that no groundwater water monitoring has been conducted, so there is not enough data to determine groundwater levels and direction of flow. Only a small portion of the site is available for nitrogen dilution and a pollutant loading analysis was not provided. Jack LaReau of the Salmon Brook Water District expressed concerns regarding potential nitrogen levels and groundwater pollution. He provided information regarding the existing aquifers in the area and is opposed to any waiver or compromise of the IWWC Regulations.
Page 2 · open in PDF
2 Reinhard Maier, 138 Day Street, stated that he is not against development, just concerned with pollution. He stated concerns regarding the proposed septic and leaching system and noted that a third option was never considered by the applicant, which is a high-reduction nitrogen, low-discharge system. Robert Flanigan, 24 Woodcliff Drive, spoke in opposition to the project citing concerns of potential wetlands contamination due to seepage of effluent, as well as surface treatment of the parking lot. Maureen Eberly, 37 Silkey Road, stated that the developer should conduct a market analysis and urged the Commission to reject the proposal. R. Li reminded the Commission that a sewer extension feasibility analysis was provided on 7/8/26 and has no further comments. ON A MOTION by D. Tolli seconded by F. Jones, the Commission voted 6-0-0 to close the public hearing at 7:46 p.m. and continue the application to the next regular meeting. ON A MOTION by D. Tolli seconded by N. Dethlefsen, the Commission voted 6-0-0 to amend the agenda to discuss Item#4a and Item#6B simultaneously. J. Laudati was recused at 7:49 p.m. 4. Show Cause Hearing a. 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a Regulated Activity without a valid IWWC Permit. This agenda item was discussed as part of agenda item #6b. J. Laudati was seated at 8:22 p.m. 5. Request for Review a. 12 Northwoods Road – N. Kimball and M. Nasshan – RFR to conduct pond maintenance within a regulated area. Applicants/property owners Nicholas Kimball and Marissa Nasshan submitted a request for continuance prior to the meeting. ON A MOTION by F. Jones seconded by S. Okie, the Commission voted 6-0-0 to grant the request and continue the Request for Review to the next regular meeting. b. 199 Barn Door Hills Road – J. Lambert c/o Lambert’s Lawn Care – RFR to conduct pond and culvert maintenance, plantings, and invasive species management within a regulated area. Applicant Joseph Lambert of Lambert’s Lawn Care was present to discuss the application. He is seeking permission to restore an existing pond on-site that is suffering from low water levels due to the overgrowth of invasive species, the accumulation of excess sediment, and erosion of the pond’s boundaries. Proposed maintenance includes clearing all obstructions from the culvert to the pond, removing invasives, adding rock formations and silt fencing to stabilize the borders of the pond, and applying all-natural “Muckout” to introduce healthy
Page 3 · open in PDF
3 bacteria and enzymes back into the water. In order to aerate and oxygenate the water, a fountain is proposed in the center of the pond, which would require the installation of underground electrical conduit and a water line. The homeowner would also like to improve other areas of the property by removing dead/diseased trees, removing invasives, eliminating raised garden beds, etc. J. Lambert noted that establishment of the pond coincides with the development of the Kettle Pond Lane subdivision. J. Laudati questioned whether the proposed activities are permitted under an RFR or would require a permit. K. Bednaz and the Commission deliberated on the scope of work and determined that stabilization of the site, invasives removal, drainage, and boulder placement were permitted under the RFR. The installation of underground electrical conduit and water line for a water fountain requires the submittal of a permit application. ON A MOTION by J. Laudati seconded by S. Okie, the Commission voted 6-0-0 to approve the application as an As of Right Determination per the Inland Wetlands and Watercourses Commission Regulations, Section 4.1.d, limited to the stabilization of the site, invasives removal, drainage, and boulder placement. c. 45 Barkhamsted Road – N. Higley – RFR to excavate and remove debris from front yard and reestablish lawn area within a regulated area. Applicant Nicholas Higley was present to discuss the application. He is seeking permission to clean up the property by excavating and removing debris that was buried throughout the yard. He plans to excavate 2 feet down to capture all the debris, save 3-4” of soil, bring in additional soil for a new base, and then spread 18-20” of topsoil. Erosion and sedimentation control measures will be installed and once graded, grass seed and mulch will be applied. In addition, the construction of a stone wall is proposed. All work is within the 200-foot upland review area of Salmon Brook. ON A MOTION by J. Laudati seconded by S. Okie, the Commission voted 6-0-0 to approve the application as an As of Right Determination per the Inland Wetlands and Watercourses Commission Regulations, Section 4.1.d. Agenda item#6A was discussed after agenda item#8. 6. Permit Requests b. 7 Laurel Drive – C. Fontaine and R. Weiner – Permit request to place a prefabricated shed on crushed stone, install drainage piping, remove pine trees, install a split-rail fence and restore lawn within a regulated area. Professional Engineer TJ Barresi, as well as property owners Colleen Fontaine and Ross Weiner were present to discuss their application, which was received and continued from the prior meeting. Revised plans were submitted today that reflect changes in location for the shed, yard drain and drainage swale, and address staff comments regarding elevations and a mitigation plan. K. Bednaz provided background information on the property, as well as observations made during various site inspections. Although some plants required as part of the prior Enforcement Order have not survived, she noted that other vegetation has naturally taken over.
Page 4 · open in PDF
4 Alternative planting locations were recommended, and a draft approval letter was provided for review and consideration by the Commission. Attorney Kari Olson and Soil Scientist Thomas Stansfield were present via zoom. T. Stansfield stated that the improvements shown on the revised plans were sufficient and would not have an adverse impact on the site. K. Olson requested specificity on the alternative plantings and C. Fontaine questioned the plantings that were required as part of the prior Enforcement Order. K. Bednaz provided clarification, and the Commission reviewed the draft approval letter. ON A MOTION by B. Schmitt seconded by N. Dethlefsen, the Commission voted 4-1-0 to approve the application and draft approval letter as amended. D. Tolli opposed. c. 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – RFR for site evaluation and stabilization of erosion and sedimentation issues within a regulated area. Kevin Sullivan and John Gravel (via zoom) were present to discuss the application. In response to staff comments at the last meeting, an application was submitted to address the aftermath of erosion that occurred on site. K. Bednaz stated that documentation must be submitted detailing how much sediment was removed, where it was deposited, how it will be removed, a mitigation plan, and timeline. K. Sullivan noted that soil samples were taken and they were able to narrow the erosion down to two scours. The plan is to remove the sedimentation then put down a native seed mix. Cultivation of the site has begun, and no further erosion has occurred since the installation of additional erosion and sedimentation control measures. K. Bednaz noted that the application is listed as an RFR and needs to be a permit request with submittal of the corresponding fee. The application was received and continued to the next regular meeting. J. Laudati was recused at 9:21 p.m. 7. Agent Report and Correspondence a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated Activity without a valid IWWC Permit. Attorney Timothy Furey was present on behalf of the property owner to provide updates. Based on conversation with Town Attorney Richard Roberts, Attorney Furey will work directly with Attorney Roberts on addressing the Enforcement Order, which will then be directed to IWWC Agent Kate Bednaz, and finally, the Commission. At this time, no updates have been provided from DEEP regarding review of the engineered plans for the dam. Attorney Furey provided documentation from Nick Zito of the CT DEEP Forestry Division, stating that they have no concerns with respect to the forestry operation on the subject property. Logging contractor Matthew Yard spoke in regard to the logging operation he conducted on the property, noting that 75 acres were approved for clearing; however, only 50% was completed. K. Bednaz provided clarification regarding issues surrounding the RFR as some of the activities conducted have impacted existing wetlands. She notified the Commission that a demand letter has been issued by Town Attorney Richard Roberts and stated that all wetland boundaries must be shown on a plan for the cattle RFR to be considered. ON A MOTION by N. Dethlefsen seconded by B. Schmitt, the Commission voted 5-0-0 to continue this agenda item to the next regular meeting.
Page 5 · open in PDF
5 8. Request for Review a. 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – RFR to establish a cattle farm with paddocks, run-in sheds, underground electrical conduit, etc. This agenda item was tabled per the request of applicant representative Attorney Furey. J. Laudati was re-seated at 9:43 p.m. The Commission took a 4-minute recess at 9:43 p.m. 6. Permit Requests a. 53 West Granby Road and 215 Salmon Brook Street – Town of Granby – Permit application to construct a walking path and associated improvements within a regulated area. Since the application was received and discussed at the prior meeting, revised plans have been submitted to address all outstanding items. IWWC Agent Kate Bednaz and the Commission had no questions or concerns. ON A MOTION by S. Okie seconded by D. Tolli, the Commission voted 6-0-0 to approve the application and draft approval letter as presented. 9. Commissioner Reports and Correspondence None 10. Adjourn ON A MOTION by S. Okie seconded by N. Dethlefsen, the Commission voted 6-0-0 to adjourn the meeting at 9:50 p.m. Respectfully submitted, Renee Deltenre Land Use Coordinator
View the agenda PDF on this page (IWWC Agenda)
Text of the agenda (IWWC Agenda, 1 page)
Page 1 · open in PDF
Town of Granby Inland Wetlands and Watercourses Commission Regular Meeting Agenda Wednesday, October 14, 2026, at 7:00 pm Town Hall Meeting Room Please note: Any person who wishes to provide materials for display on the video monitors at an IWWC meeting where such monitors are being used to video conference the meetings must email the materials no later than 10 AM on the day of the meeting. All materials must be contained in a single attachment to the email. Materials received after the 10 AM deadline will not be accepted for display. Display of the materials is subject to all other rules and procedures of the IWWC. Zip drive, memory sticks and other data storage devices will not be accepted. Zoom: https://us06web.zoom.us/j/88097165233?pwd=BeaLXJaV2bhzELdbzFhI2QZs2Ne0un.1 Call In: 929-205-6099 Meeting ID: 899 2735 9975 Passcode: 146326 1. Call to Order 2. Action on the September 9, 2026, Meeting Minutes 3. Public Hearings a. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in connection with the development of a 16-unit apartment building and associated site improvements. (Opened/continued from 7/8/26) 4. Show Cause Hearing a. 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a Regulated Activity without a valid IWWC Permit. (Opened/continued from 7/8/26) 5. Request for Review a. 12 Northwoods Road – N. Kimball and M. Nasshan – RFR to conduct pond maintenance within a regulated area. (Received/continued from 9/9/26) b. 199 Barn Door Hills Road – J. Lambert c/o Lambert’s Lawn Care – RFR to conduct pond and culvert maintenance, plantings, and invasive species management within a regulated area. c. 45 Barkhamsted Road – N. Higley – RFR to excavate and remove debris from front yard and reestablish lawn area within a regulated area. 6. Permit Requests a. 53 West Granby Road and 215 Salmon Brook Street – Town of Granby – Permit application to construct a walking path and associated improvements within a regulated area. (Received/continued from 9/9/26) b. 7 Laurel Drive – C. Fontaine and R. Weiner – Permit request to place a prefabricated shed on crushed stone, install drainage piping, remove pine trees, install a split-rail fence and restore lawn within a regulated area. (Received/continued from 9/9/26) c. 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – RFR for site evaluation and stabilization of erosion and sedimentation issues within a regulated area. 7. Agent Report and Correspondence a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated Activity without a valid IWWC Permit. 8. Request for Review a. 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – RFR to establish a cattle farm with paddocks, run-in sheds, underground electrical conduit, etc. 9. Commissioner Reports and Correspondence 10. Adjourn
Text of the packet (IWWC Meeting Packet, 129 pages)
Page 1
Town of Granby Inland Wetlands and Watercourses Commission Regular Meeting Agenda Wednesday, October 14, 2026, at 7:00 pm Town Hall Meeting Room Please note: Any person who wishes to provide materials for display on the video monitors at an IWWC meeting where such monitors are being used to video conference the meetings must email the materials no later than 10 AM on the day of the meeting. All materials must be contained in a single attachment to the email. Materials received after the 10 AM deadline will not be accepted for display. Display of the materials is subject to all other rules and procedures of the IWWC. Zip drive, memory sticks and other data storage devices will not be accepted. Zoom: https://us06web.zoom.us/j/88097165233?pwd=BeaLXJaV2bhzELdbzFhI2QZs2Ne0un.1 Call In: 929-205-6099 Meeting ID: 899 2735 9975 Passcode: 146326 1. Call to Order 2. Action on the September 9, 2026, Meeting Minutes 3. Public Hearings a. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in connection with the development of a 16-unit apartment building and associated site improvements. (Opened/continued from 7/8/26) 4. Show Cause Hearing a. 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a Regulated Activity without a valid IWWC Permit. (Opened/continued from 7/8/26) 5. Request for Review a. 12 Northwoods Road – N. Kimball and M. Nasshan – RFR to conduct pond maintenance within a regulated area. (Received/continued from 9/9/26) b. 199 Barn Door Hills Road – J. Lambert c/o Lambert’s Lawn Care – RFR to conduct pond and culvert maintenance, plantings, and invasive species management within a regulated area. c. 45 Barkhamsted Road – N. Higley – RFR to excavate and remove debris from front yard and reestablish lawn area within a regulated area. 6. Permit Requests a. 53 West Granby Road and 215 Salmon Brook Street – Town of Granby – Permit application to construct a walking path and associated improvements within a regulated area. (Received/continued from 9/9/26) b. 7 Laurel Drive – C. Fontaine and R. Weiner – Permit request to place a prefabricated shed on crushed stone, install drainage piping, remove pine trees, install a split-rail fence and restore lawn within a regulated area. (Received/continued from 9/9/26) c. 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – RFR for site evaluation and stabilization of erosion and sedimentation issues within a regulated area. 7. Agent Report and Correspondence a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated Activity without a valid IWWC Permit. 8. Request for Review a. 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – RFR to establish a cattle farm with paddocks, run-in sheds, underground electrical conduit, etc. 9. Commissioner Reports and Correspondence 10. Adjourn
Page 2
1 MEETING MINUTES Town of Granby Inland Wetlands and Watercourses Commission Wednesday, September 9, 2026, at 7:00 p.m. PRESENT: Nick Dethlefsen, David Tolli, Sue Okie, John Laudati, Barbara Schmitt, and Fred Jones (via Zoom) ALSO PRESENT: IWWC Agent Kate Bednaz and Land Use Coordinator Renee Deltenre 1. Call to Order Chair J. Laudati called the meeting to order at 7:00 p.m. 2. Action on the August 12, 2026, Meeting Minutes ON A MOTION by D. Tolli, seconded by S. Okie, the Commission voted 4-0-0 to approve the August 12, 2026, minutes as presented. J. Laudati and S. Okie abstained. 3. Public Hearings a. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in connection with the development of a 16-unit apartment building and associated site improvements. Professional Engineer Rebecca Li was present to discuss the application. Since the last meeting in August, septic approval was received from the CT Department of Public Health and Farmington Valley Health District. R. Li provided additional application material, which consisted of a project timeline and map of the project area indicating septic system locations for the abutting properties. K. Bednaz provided her latest review comments, indicating that all concerns have been addressed and it is her opinion that the functions and values of the existing wetlands system will not be impacted by this development. Public Comment Attorney George Schober spoke on behalf of his client Peter Voskowsky, who is an abutting property owner. He requested a continuance of the public hearing so that Professional Engineer Steve Trinkaus may have time to review the newly submitted material. Attorney Schober proposed feasible and prudent alternatives, such as connecting to public sewer or reducing the unit count and expressed concerns regarding hydrology and contamination. Reinhard Maier, 138 Day Street, had concerns regarding the proposed septic and leaching system as it pertains to nitrogen dilution and groundwater pollution. Robert Flanigan, 24 Woodcliff Drive, expressed concerns regarding potential wetlands contamination due to seepage of effluent, as well as surface treatment of the parking lot during the winter months.
Page 3
2 Maureen Eberly, 37 Silkey Road, questioned the legitimacy of the test pit results, invasive species located on site and stated that the development shall connect to public sewer. Ron Levesque of R Levesque Associates, Inc. spoke on behalf of the project and submitted a formal request to continue the public hearing to the next regular meeting on October 14, 2026. ON A MOTION by S. Okie seconded by B. Schmitt, the Commission voted 6-0-0 to continue the public hearing to the next regular meeting. 4. Show Cause Hearing a. 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a Regulated Activity without a valid IWWC Permit. Professional Engineer TJ Barresi, as well as property owners Colleen Fontaine and Ross Weiner were present to discuss their application, which was submitted in response to the Enforcement Order issued on 7/2/26. The property owners are seeking permission to install an 18” drainage pipe, re-establish a grass line swale, remove six pine trees, place a prefabricated shed, install a split-rail fence and restore the existing lawn within a regulated area. Discussion ensued regarding the Enforcement Order from the prior owners and how the situation was resolved prior to the sale of the home. K. Bednaz provided feedback on the application, requesting that the elevations be checked and the mitigation plan consist of a 1:1 wetland restoration ratio. ON A MOTION by D. Tolli seconded by S. Okie, the Commission voted 6-0-0 to receive and continue the application to the next regular meeting. 5. Request for Review a. 12 Northwoods Road – N. Kimball and M. Nasshan – RFR to conduct pond maintenance. Applicants/property owners Nicholas Kimball and Marissa Nasshan were present to discuss their request for review. They are seeking permission to remove sediment and overgrown vegetation from an existing fire pond on their property. Over the summer large volumes of rainwater and sediment have accumulated, thus encouraging the rapid growth of vegetation that is hindering stream flow and potential backup at the existing culvert. The subject area is approximately 40 square feet, and an excavator would be utilized from the driveway to remove the material. K. Bednaz provided feedback on the application, noting that additional information is required. The applicants were directed to calculate the total volume of disturbed area, which will determine if an IWWC permit is required, consider a pumping and diversion plan, and locate a suitable location to stockpile or spread the sediment onsite. ON A MOTION by D. Tolli seconded by B. Schmitt, the Commission voted 6-0-0 to receive and continue the application to the next regular meeting.
Page 4
3 b. 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – RFR for mitigation and site stabilization within a regulated area. Aaron Svedlow of Greenfield Development and Kevin Sullivan were present on behalf of Broadleaf Solar to discuss the application. K. Sullivan explained that sorghum was planted to establish a cover cop that would address erosion issues and stabilize the area. In due time, the existing crop will either be mowed and left as a thatch, or it may be mowed down and tilled into the soil to establish another crop. K. Bednaz provided a brief overview of the project, noting a failure among the erosion and sedimentation controls last month. 218 acres were tilled and planted, and silt fence and waddles were also installed to help control erosion. K. Bednaz indicated that an IWWC Permit is required to address the aftermath of the erosion, detailing how much sediment was removed, where it was deposited, how it will be removed, a mitigation plan, and timeline. ON A MOTION by S. Okie seconded by D. Tolli, the Commission voted 6-0-0 that the proposed activity is As of Right under the farming provision in Section 4.1a. 6. Permit Requests a. 53 West Granby Road and 215 Salmon Brook Street – Town of Granby – Permit application to construct a walking path and associated improvements within a regulated area. K. Bednaz presented the application on behalf of the Town of Granby, which was received by the Commission this evening. The proposal consists of constructing a pedestrian walking path from the parking lot located at 53 West Granby Road to the soccer fields located at 215 Salmon Brook Street (Salmon Brook Park). The path will be constructed in the same location of the existing woods trail and consists of a series of stairs to address the steep slope. The total project area is approximately 25,580 square feet and will have a five-foot wide, 1,514-foot bituminous concrete path within the existing grass area and a six-foot wide, 630-foot stone dust path with stairs within the woods. Approximately 1,600 feet of bituminous walk will be located in wetland (floodplain) soils, and the reconstructed woods path will cover approximately 2,722 square feet of wetlands/regulated area. In addition, a total of 15,000 square feet of wetland (floodplain) area will be disturbed; of which 9,960 square feet will be temporary. ON A MOTION by D. Tolli seconded by N. Dethlefsen, the Commission voted 6-0-0 to receive and continue the application to the next regular meeting. J. Laudati left the meeting at 9:15 p.m. 7. Agent Report and Correspondence a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated Activity without a valid IWWC Permit. Attorney Timothy Furey was present on behalf of the property owner to provide updates, along with Soil Scientist David Lord who addressed comments raised at the prior meeting. Attorney Furey noted that revised drawings were recently submitted to DEEP from Professional Engineer Karl Acimovic and Robert Green Associates, LLC. D.
Page 5
4 Lord discussed existing conditions related to soil erosion and sedimentation, as well as existing wetlands in the paddock areas. K. Bednaz reiterated that an existing conditions and comprehensive mitigation plan for the areas outside of DEEP’s jurisdiction has not been submitted. Since no mapped wetlands delineation has been provided, she requested a meeting on-site to view and discuss the flagged wetlands in order to move things forward. In advance of the next meeting, the property owner was directed to provide the boundaries of disturbance, along with a wetland delineation and mitigation plan for the entire site. ON A MOTION by D. Tolli seconded by B. Schmitt, the Commission voted 5-0-0 to continue this agenda item to the next regular meeting. F. Jones left the meeting at 9:54 p.m. b. 54 Hartford Avenue – B. Richard – Permit request to construct a 14’x24’ prefabricated shed on crushed stone within a regulated area. Authorized Agent approval 9/4/26. K. Bednaz provided an update regarding the bridge installation at 15 Peck Orchard Road, stating that everything was in good order. 8. Commissioner Reports and Correspondence None 9. Adjourn ON A MOTION by N. Dethlefsen seconded by B. Schmitt, the Commission voted 4-0-0 to adjourn the meeting at 9:58p.m. Respectfully submitted, Renee Deltenre Land Use Coordinator
Page 6
The following 5 items were received after the meeting packet was posted.
Page 7
Outlook 37 Hartford ave- Letter to commission From Forrest Devine <forrestdevine7@gmail.com> Date Wed 10/14/2026 1:21 PM To Granby Wetlands Agent <wetlandsagent@granby-ct.gov> Cc Renee Deltenre <RDeltenre@granby-ct.gov>; george@schoberschober.com <george@schoberschober.com>; strinkaus@earthlink.net <strinkaus@earthlink.net>; Abigail Kenyon <akenyon@granby-ct.gov>; Rebecca Li <RebeccaL@rlaland.com>; Rob Levesque <robl@rlaland.com>; Nina Fazio <ninaf@rlaland.com>; Fancy, Rachel <rmf@fitzgeraldpc.com> 3 attachments (1 MB) Letter to Chair-37 Hartford ave granby.pdf; Trinkaus Review Comparisions.docx; 26-1636 (Project Husky) - RC Letter - Trinkaus Cases 10-5- 26.pdf; CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. October 14, 2026 To: Kate Bednaz Inland Wetlands Agent Town of Granby 15 North Granby Road Granby, CT 06035 Re: 37 Hartford Avenue – Submission of Supporting Documentation Dear Kate, On behalf of Devine Construction Inc., I am submitting three documents for inclusion in the public hearing record regarding our proposed development at 37 Hartford Avenue. I want to clarify that these documents do not introduce any new information regarding the proposed development, site conditions, engineering, or environmental impacts. Rather, they contain findings and supporting documentation related to the intervenor’s professional engineer, Steven Trinkaus, P.E., and the nature of his reviews and comments. The purpose of this submission is to provide the Commission with additional context regarding the professional opinions and statements already presented during the hearing process. We respectfully request that you read this correspondence into the public hearing record and enter all three attached documents into the official record for the Commission’s consideration. We appreciate your assistance and the Commission’s continued time and attention to this application. Sincerely, Forrest Devine Devine Construction Inc. 413-478-9691 forrestdevine7@gmail.com Attachments: Three supporting documents regarding the intervenor’s professional engineer.
Page 8
October 14, 2026 John Laudati, Chairman Town of Granby Inland Wetlands & Watercourses Commission 15 North Granby Road Granby, Connecticut 06035 Re: Trinkaus Engineering Reviews & Relation to the Proposed 37 Hartford Avenue Project Dear Chairman Laudati and Commissioners, Devine Construction is respectfully submitting the enclosed comparison regarding the review comments provided by the intervening party’s consultant, Mr. Trinkaus, concerning the proposed development at 37 Hartford Avenue. We respect the intervening party’s right to participate in this process and understand the importance of reviewing potential environmental impacts. Our concern is whether the comments provided accurately reflect the conditions at our project site and are supported by site-specific information and technical evidence. In reviewing the correspondence received by Steven Trinkaus, P.E., along with publicly available news articles, court decisions, and materials from other Connecticut projects involving Mr. Trinkaus, we identified identical language and similar claims across multiple project reviews. The enclosed materials include examples of repetitive language from Mr. Trinkaus’ reviews, as well as a recent letter from the legal counsel for a project proponent in another town where Mr. Trinkaus provided a third-party review. Given the differences in site conditions and proposed work among these projects, we believe these similarities are worth bringing to the Commission’s attention. We recognize that similar environmental concerns can arise at different sites, and that repeated language alone does not mean a technical opinion is incorrect. However, based on the identical language being utilized between multiple independent reviews on various projects, the multiple cases referenced by the Robinson & Cole letter dated 10/05/2026, show a distinct pattern taken in the intervention process. Forrest Devine | 413-478-9691 | forrestdevine7@gmail.com
Page 9
We believe the comments submitted for 37 Hartford Avenue should be evaluated within the regulatory context and scale applicable to our project. Many of the comments provided are not only copied and pasted from other review letters, but are not applicable, or based on a regulatory framework or guidance documents. We respectfully ask the Commission to consider the project on its merits and the record established during the public hearing process. Signed: Forrest Devine Forrest Devine | 413-478-9691 | forrestdevine7@gmail.com
Page 10
1. Summary of findings • Letters reviewed: 17 Trinkaus review letters or reports covering 13 projects in 11 municipalities (Madison, Greenwich, New Canaan, Wilton, Milford, North Haven, Plymouth, Woodbridge, Newtown, Easton, Granby), dated April 2021 through August 2026. 14 are full text from municipal and state websites. 3 are his comments as reproduced or quoted by others (Granby by RLA, Newtown by Civil 1, Wilton 2/11/2026 by the Town's peer reviewer Tighe & Bond). Letters in four court matters (Fairfield Housing, 15 Unquowa Rd, 751 Weed St, Gagnon) are known only through passages the courts quoted (Section 6). • Recurring formulas: the Executive Summary conclusion that the system "will not adequately reduce non-point source pollutant loads which will result in increased pollutant loads being discharged to the [wetland/watercourse]" recurs, with only the receiving water changed, in Milford, Woodbridge, Easton, Newtown, Madison (variant) and Granby (variant), and in 2022 Fairfield reports quoted by the courts. • Court observation already on record: in 751 Weed Street v. New Canaan P&Z (O'Hanlan, J., July 1, 2025, p. 84 n.), the court said his testimony "is nearly identical to his testimony in other matters" and quoted his Fairfield, Unquowa and Gagnon language side by side.
Page 11
Side-by-side passages (repeated text highlighted) 2a. "Magically reduced" critique of the 2024 Manual retention-volume rule Letter Passage (yellow = shared with another project's letter) ESR-26a Saddle Ridge Cluster Subdivision Easton IWWA / Conservation Comm. Feb. 1, 2026 The applicant claims that since they are containing the water quality volume in the stormwater system, the pollutant loads are magically reduced as the following language from the CT DEEP 2024 Storm Water Quality Manual seems to imply: "Achieving these minimum required load reductions for sediment and nutrients is assumed to provide adequate reductions of other stormwater pollutants including floatable materials. However, it is important to note that if the full retention goal (i.e., Required Retention Volume) is met, then it is assumed pollutant reduction is also achieved and individual pollutant calculations are not necessary. WBH-26 345 Belden Hill Rd senior living Wilton IWC Feb. 11, 2026 The applicant claims that since they are containing the water quality volume in the multiple stormwater systems, the pollutan t loads are magically reduced as the following language from the CTDEEP 2024 Storm Water Quality Manual seems to imply: "Achieving these minimum required load reductions for sediment and nutrients is assumed to provide adequate reductions of other stormwater pollutants including floatable materials. However, it is important to note that if the full retention goal (i.e., Required Retention Volume) is met, then it is assumed pollutant reduction is also achieved and individual pollutant calculations are not necessary. GRA-26* 37 Hartford Avenue Granby IWWC Aug. 2026 review + Sept. 3, 2026 replies The applicant claims that since they are containing the water quality volume in the multiple stormwater systems, the pollutan t loads are magically reduced as the following language from the CT DEEP 2024 Storm Water Quality Manual seems to imply: "Achieving these minimum required load reductions for sediment and nutrients is assumed to provide adequate reductions of other stormwater pollutants including floatable materials. However, it is important to note that if the full retention goal ( i.e., Required Retention Volume) is met, then it is assumed pollutant reduction is also achieved and individual pollutant calculations are not necessary. ESR-26b Saddle Ridge Cluster Subdivision Easton IWWA / Conservation Comm. Aug. 31, 2026 The applicant claims that since they are containing the water quality volume in the stormwater system, the pollutant loads are magically reduced as the following language from the CT DEEP 2024 Storm Water Quality Manual seems to imply: "Achieving these minimum required load reductions for sediment and nutrients is assumed to provide adequate reductions of other stormwater pollutants including floatable materials. However, it is important to note that if the full retention goal (i.e., Required Retention Volume) is met, then it is assumed pollutant reduction is also achieved, and individual pollutant calculations are not necessary.
Page 12
2b. "Not supported by science for the following reasons" – five-part list (a–e) Letter Passage (yellow = shared with another project's letter) ESR-26a Saddle Ridge Cluster Subdivision Easton IWWA / Conservation Comm. Feb. 1, 2026 The above statement is not supported by science for the following reasons: m. Treatment Processes: Effective removal relies on specific physical, chemical, and biological processes occurring within the practice, such as sedimentation, filtration, adsorption, and microbial action. Holding the water simply provides the opportunity for these process to work. n. Design and Maintenance: The specific design of the practice (e.g., detention pond, rain garden, permeable pavement) and its ongoing maintenance are vital for ensuring these processes function correctly. Clogged systems or short-circuiting flow paths can drastically reduce efficiency, even if the total volume is captured. o. Pollutant Characteristics: Different pollutants behave differently. Suspended solids often settle out well, while dissolved nutrients (like nitrogen and phosphorus) or certain chemicals might require specialized treatment components or longer retention times for effective removal. p. Storm Dynamics: The WQV is typically designed for a specific "design storm" (e.g., the first flush or a 90% storm event) [1]. Larger or more intense storms may overwhelm the system, resulting in bypass or reduced treatment efficiency for the excess volume. q. Many stormwater practices found in the 2024 CT DEEP Storm Water Quality Manual are incapable of providing the high level of reduction required. As an example, a Dry Detention Basin is rated by CT DEEP to have Moderate TSS removal and low TP and TP removal, so it does not matter how much water is held in a Dry Detention Basin, the required pollutant load reductions will never be met as the system cannot provide them. WBH-26a 345 Belden Hill Rd senior living Wilton IWC Feb. 11, 2026 The above statement is not supported by science for the following reasons: a. Treatment Processes: Effective removal relies o n specific physical, chemical, and biological processes occurring within the practice, such as sedimentation, filtration, adsorption, and microbial action. Holding the water simply provides the opportunity for these processes to work. b. Design and Maintenance: The specific design of the practice (e.g., detention pond, rain garden, permeable pavement) and its ongoing maintenance are vital for ensuring these processes function correctly. Clogged systems or short-circuiting flow paths can drastically reduce efficiency, even if the total volume is captured. c. Pollutant Characteristics: Different pollutants behave differently. Suspended solids often settle out well, while dissolved nutrients (like nitrogen and phosphorus) or certain chemicals might require specialized treatment components or longer retention times for effective removal. d. Storm Dynamics: The WQV is typically designed for a specific "design storm" (e.g., the first flush or a 90% storm event). Larger or more intense storms may overwhelm the system, resulting in bypass or reduced treatment efficiency for the excess volume. e. Many stormwater practices found in the 2024 CTDEEP Storm Water Quality Manual are incapable of providing the high level of reduction required. As an example, a Dry Detention Basin is rated by CTDEEP to have Moderate TSS removal and low TP and TN removal, so it does not matter how much water is held in a Dry Detention Basin, the required pollutant load reductions will never be met as the system cannot provide them.
Page 13
GRA-26 37 Hartford Avenue Granby IWWC Aug. 2026 review + Sept. 3, 2026 replies The above statement is not supported by science for the following reasons: Treatment Processes: Effective removal relies on specific physical, chemical, and biological processes occurring within the practice, such as sedimentation, filtration, adsorption, and microbial action. Holding the water simply provides the opportunity for these processes to work. Design and Maintenance: The specific design of the practice (e.g., detention pond, rain garden, permeable pavement) and its ongoing maintenance are vital for ensuring these processes function correctly. Clogged systems or short-circuiting flow paths can drastically reduce efficiency, even if the total volume is captured. Pollutant Characteristics: Different pollutants behave differently. Suspended solids of ten settle out well, while dissolved nutrients (like nitrogen and phosphorus) or certain chemicals might require specialized treatment components or longer retention times for effective removal. Storm Dynamics: The WQV is typically designed for a specific "design storm" (e.g., the first flush or a 90% storm event) [1]. Larger or more intense storms may overwhelm the system, resulting in bypass or reduced treatment efficiency for the excess volume. Many stormwater practices found in the 2024 CT DEEP Storm Water Quality Manual are incapable of providing the high level of reduction required. As an example, a Dry Detention Basin is rated by CT DEEP to have Moderate TSS removal and low TP and TP removal, so it does not matter how much water is held in a Dry Detention Basin, the required pollutant load reductions will never be met as the system cannot provide them. ESR-26b Saddle Ridge Cluster Subdivision Easton IWWA / Conservation Comm. Aug. 31, 2026 The above statement is not supported by science for the following reasons: a. Treatment Processes: Effective removal relies o n specific physical, chemical, and biological processes occurring within the practice, such as sedimentation, filtration, adsorption, and microbial action. Holding the water simply provides the opportunity for these process to work. b. Design and Maintenance: The specific design of the practice (e.g., detention pond, rain garden, permeable pavement) and its ongoing maintenance are vital for ensuring these processes function correctly. Clogged systems or short-circuiting flow paths can drastically reduce efficiency, even if the total volume is captured. c. Pollutant Characteristics: Different pollutants behave differently. Suspended solids often settle out well, while dissolved nutrients (like nitrogen and phosphorus) or certain chemicals might require specialized treatment components or longer retention times for effective removal. d. Storm Dynamics: The WQV is typically designed for a specific "design storm" (e.g., the first flush or a 90% storm event) [1]. Larger or more intense storms may overwhelm the system, resulting in bypass or reduced treatment efficiency for the excess volume. e. Many stormwater practices found in the 2024 CT DEEP Storm Water Quality Manual are incapable of providing the high level of reduction required. As an example, a Dry Detention Basin is rated by CT DEEP to have Moderate TSS removal and low TP and TP removal, so it does not matter how much water is held in a Dry Detention Basin, the required pollutant load reductions will never be met as the system cannot provide them.
Page 14
3. What courts and other reviewers have said about repetition • 751 Weed Street, LLC v. New Canaan P&Z (Super. Ct., Land Use Docket, O'Hanlan, J., July 1, 2025), p. 84 n.: "[T]he court observes that Trinkaus' testimony in this matter — except for the very last, i.e., road icing—is nearly identical to his testimony in other matters." The court then quotes Fairfield Housing, Unquowa and Gagnon (p. 85 n.). • 15 Unquowa Road v. Fairfield TPZ (Frazzini, J.T.R., Aug. 20, 2024), as quoted in Weed St: his 2022 report concluded "[t]he stormwater management system will not be effective at reducing non- point source pollutant loads and will result in increased pollutant loads being discharged into the Town of Fairfield drainage system." • Newtown, 90 Mt Pleasant Rd: Civil 1 response (Jan. 15, 2026, OCR): "We have previously received this same comment from the respondent on other projects, including the Riverview Cinema in Southbury, Connecticut." Also: "The review selectively cites isolated provisions of applicable regulations while omitting controlling s ections . . . ." These are the applicant's engineer's statements, not findings.
Page 15
Robinson+Cole October 5, 2026 Sandy Eggers, Chair Inland Wetlands and Watercourses Commission Town of Killingly 172 Main Street Killingly, CT 06239 E VAN J. S EEMAN One State Street Hartford, CT 06103 Main ( 860) 275-8200 Fax ( 860) 275-8299 eseeman@rc.com Direct ( 860) 275-8247 Re: Application # 26-1636; Ryan Companies US, Inc. — Project Husky Cases Involving Mr. Trinkaus Dear Chair Eggers and Members of the Commission: This firm represents Ryan Companies US, Inc. ( the " Applicant'). The proposed intervenors have hired Steve Trinkaus, P.E., to oppose the Applicant's project. The Applicant recognizes that it is the role of the Commission to assess the credibility of witnesses. When assessing Mr. Trinkaus' credibility, the Commission should be aware that within the past 2 years, the Superior Court of Connecticut has found Mr. Trinkaus to be not credible on at least 4 separate occasions. Relevant quotes from those cases fmding Mr. Trinkaus to be not credible appear below: Fairfield Housing Corp. v. Cons. Comm'n, 2024 WL 4274779 ( Sept. 19, 2024) "Given his inaccuracies, factual incompleteness, and selective omissions, Trinkaus' opinions do not constitute a substantial basis of fact sufficient to sustain the commission's denial." Id. at 16. "Therefore, Trinkaus' conclusions can only be seen as speculative or conjectural, without supporting analysis. Further, Trinkaus' views about increased storm water volume, no infiltration and poor water quality were based upon selective citation from the DEP Manual that omitted parts of the guidelines that, when read together, demonstrated both that his criticism was not valid, and that the work of plaintiff's engineer was competent." Id. at 15. "Trinkaus' opinion regarding infiltration is similarly flawed as incomplete and selective in its articulation of DEP guidelines." Id. at 16. Boston I Hartford I iNewYork I Washington,DC I Providence I n1iami I Austin I Stamford I Wilmington I Philadelphia I Los Angeles I Albany rc.com I Robi nson R Cole i,t.r
Page 16
Robinson+Cole Inland Wetlands and Watercourses Commission October 5, 2026 Page 2 "Therefore, the reports and evidence from Trinkaus are based on incomplete information that is not substantiated by the record developed during the public hearing and upon which the commission could rely." Id. at 17. 751 Weed Street, LLC v. Planning and Zoninz Comm'n, 2025 WL 1878800 ( July 1, 2025) "In sum, the commission's denial is unfounded based on Trinkaus' debunked views. Plaintiff's engineer, and even Coplit, but especially Canas, who acted in a classic peer review role, and who more than the others, together demonstrated that Trinkaus' views were flawed." Id. at 45. "Therefore, the overwhelming evidence of record is that evaluation of the pros and cons of plaintiff's proposal, fairly and under the statutory standard, was a process that took place among the other engineers, not with Trinkaus." Id. "The court's review of his July 11, 2022 letter reveals no calculations at all by Trinkaus, either to support his positions or to demonstrate that plaintiff's detailed engineering calculations in the reports submitted were in error." Id. at 16 n. 32. "Further, the court observes that Trinkaus' testimony in this matter — except for the very last, i.e., road icing — is nearly identical to his testimony in other matters." Id. at 42 n.62. "Reading the transcript of the final hearing made one wonder if Trinkaus was discussing a different application than Coplit and D'Andrea, so different was his criticism from their apparent, but reasoned, recent consensus that plaintiff had met the legitimate concerns raised by Coplit in her analysis and by Canas in his peer review. The court finds it significant that Coplit largely ignored Trinkaus...." Id. at 44 n.67. "Trinkaus also misrepresented to one commission member who asked for the calculations that form the basis for his conclusions that engineering structures would not work, that his reports contained such calculations. As noted previously, his reports contain no calculations." Id. at 45 n. 68. Alimi v. Inland Wetlands Board, 2026 WL 1398286 ( May 12, 2026) "The record is clear that Trinkaus' conclusions were factually inaccurate or based on outdated information and that he selectively omitted evidence. Plaintiff's engineers addressed these inaccuracies and defects on the record and Trinkaus made no effort to either refute the criticism or, even worse, to correct his own statements." Id. at 36.
Page 17
Robinson+Cole Inland Wetlands and Watercourses Commission October 5, 2026 Page 3 "In sum, Trinkaus' views, relying upon obsolete, partial or false factual bases, were clearly unsound.... Given his inaccuracies, factual incompleteness, and selective omissions and his failure to provide any detailed analysis to refute that of the qualified engineers he was critiquing, Trinkaus' opinions do not constitute a substantial basis of fact sufficient for the board to rely on them to deny plaintiff's application." Id. at 37. "[U]nder no scenario could it be said that his [ Trinkaus] views provided a qualitative or quantitative basis for the denial." Id. at 38. "As this court has previously observed, Trinkaus' views are generally consistent with views he has given in opposition to several other developments." Id. at 38 n. 56. "Finally, as to Trinkaus' opinion that the soils would not infiltrate stormwater, this is demonstrably false." Id, at 38. Gorra v. Honeycomb Real Estate Partners, 2026 WL 2241069 ( July 31, 2026) "While the commission did not address these glaring defects in Trinkaus' testimony directly, they are readily apparent...." Id. at 12. "Also, Jacobson Engineering revealed that certain authority Trinkaus cited could not be found and respectfully disagreed with other sources that he cited." Id. at 13. "In sum, an examination of the record exposes the stark qualitative difference between Jacobson Engineering's measured tone and detail, in its role as consulting engineer to the commission, and Trinkaus' repetitive conclusions and inaccuracies, made without supporting detail or analysis." Id. at 13. "As discussed further herein, Trinkaus made factual misrepresentations in his evaluations of defendants' stormwater management plan ... and in his testimony ... in which he continued to repeat criticism about stormwater capacity of the town's system that Jacobson Engineering had shown to be inaccurate and rested generally on concern and speculation about pollution to non-specific wetlands that he could neither quantify or even identify. Such evidence would not have been sufficient to deny defendants' application." Id. at 10 n.15. "Similar conduct of Trinkaus as an opposition expert in other cases has been observed by this court." Id. at 12 n.19.
Page 18
Robinson+Cole Inland Wetlands and Watercourses Commission October 5, 2026 Page 4 The Applicant respectfully requests that when assessing the credibility of Mr. Trinkaus it consider the cases discussed above. When it does so, the Commission should find Mr. Trinkaus not credible. Thank you for your attention to this matter. Sincerely, Evan J. Seeman Robinson & Cole LLP Attorneys for Ryan Companies US, Inc.
Page 19
R LEVESQUE ASSOCIATES, INC. 40 School Street, P.O. BOX 640, Westfield, MA 01085 p 413.568.0985 · f 413.568.0986 · www.rlaland.com A L AND PL ANNING SERVICES COMPANY October 14, 2026 Via email: wetlandsagent@granby-ct.gov John L. Laudati, Chairman Town of Granby Inland Wetlands & Watercourses Commission 15 North Granby Road Granby, Connecticut 06035 RE: Summary Chart 37 Hartford Avenue Granby, Connecticut 06035 (Parcel ID: 4254) RLA Project File No. 251219 Dear Chairman Laudati and Commissioners: On behalf of the applicant of the above-referenced project, R Levesque Associates, Inc. is providing the enclosed summary chart of review comments issued by Mr. Trinkaus for the Commission’s convenience. The chart is not intended to introduce new information or serve as a supplemental submission, but rather to provide a simplified reiteration of information already included in the record to facilitate the Commission’s review. RLA will refer to the summary chart as part of our presentation at this evening’s meeting. We wanted to provide an electronic copy in advance to allow the Commission an opportunity to review the chart beforehand. Thank you for your time and consideration. Sincerely, R LEVESQUE ASSOCIATES, INC. Nina Fazio Permitting Coordinator
Page 20
Comment # Summary Status ES-A The subsurface sewage disposal system (SSDS) does not comply with environmental requirements for nitrogen, bacteria, and viruses Addressed ES-B No grounwater monitoring was done on the site to determine the depth and direction of the groundwater table table on the site Addressed ES-C Stormwater pollutants will reach downgradient wetlands Hypothetical 1 SSDS effluent treatment in coarse-grained soils Addressed 2 No grounwater monitoring was done on the site to determine the depth and direction of the groundwater table table on the site Addressed 3 Nitrogen dilution and bacteria/virus travel-time analyses are required Addressed 4a Nitrogen dilution calculation and alleged exceedance of 10 mg/L at the property line Subjective 4b Bacteria/virus travel-time calculation and alleged insufficient separation to the property line Hypothetical 5 Description of proposed underground stormwater system Addressed 6 Additional test pits required to confirm subsurface conditions before approval Addressed 7 Inlet control structure weir elevation and potential backwater condition Addressed 8 Roof runoff requires treatment due to atmospheric pollutant deposition Addressed 9 Alleged failure to meet TSS, TP, and TN pollutant load reduction requirements Addressed 10 Soluble pollutants from winter deicing will pass through soils and reach wetlands Hypothetical 11 Predicted stormwater travel time to wetlands and pollutant migration Hypothetical 12 Catch basin hood detail does not adequately retain oils and grease Addressed 13 Additional low-impact development (LID) measures should be incorporated Subjective 14 Claim that retention of the Water Quality Volume does not satisfy Stormwater Standard 1 Addressed 15 Water Quality Volume calculation uses areas not tributary to the stormwater system Addressed 16 Pollutant load reductions cannot be established through storage volume alone Addressed 17 Criticism of the CT DEEP Manual's retention-based pollutant reduction methodology Subjective 18 General scientific objections to assumed pollutant reductions, treatment processes, maintenance, and storm events Subjective 19 Additional pollutant loading analysis required due to soil permeability and alleged lack of treatment Addressed 20 Use of the Rawls infiltration rate without an additional safety factor Addressed 21 Alleged requirement to reduce the Rawls rate by 50% under the CT DEEP Manual Addressed 22 Snow storage areas are allegedly inaccessible or insufficient for effective snow management Addressed 37 Hartford Avenue, Granby, CT Peer Review Summary Chart
Page 21
1
Trinkaus Engineering, LLC
114 Hunters Ridge Road
Southbury, Connecticut 06488
203-264-4558 (office)
+1-203-525-5153 (mobile)
E-mail: strinkaus@earthlink.net
http://www.trinkausengineering.com
August 10, 2026, Revised to 10/12/26
Mr. John Laudati, Chairman
Inland Wetlands and Watercourses Commission
15 North Granby Road
Granby, Connecticut 06035
Re: 8-30g Application
37 Hartford Avenue
Granby, Connecticut
Dear Mr. Laudati and Members of the Inland Wetlands and Watercourses Commission,
At the request of Peter Voskowsky, I have reviewed the information discussed at the
September 9, meeting of the Inland Wetlands and Watercourses Commission for the above
referenced project and have the following comments for your consideration.
Executive Summary:
A. The sewage disposal system as proposed does not comply with environmental
requirements for nitrogen and bacteria and viruses. Comment has not been addressed.
B. No groundwater monitoring was done on the site to determine the depth and direction of
the groundwater table on the site. This is critical information to know to be able to
assess additional environmental impacts on the downgradient wetland area. Response
provided, but did not address the comment.
C. The proposed stormwater management system will result in soluble non-point source
pollutants being discharged into the groundwater table and ultimately reaching the
downgradient wetland area. Comment has not been addressed.
Sewage Disposal System:
1. Monitoring of groundwater on the site has not been done. This is necessary to determine
the depth and direction of groundwater movement under the site. This is important to
determine if nitrogen from the proposed sewage disposal system will flow toward or
away from the downgradient wetland area.
2. The nitrogen analysis goes hand in hand with the groundwater monitoring as the area
available for dilution is dependent upon the direction of the groundwater flow.
Page 22
2 Stormwater Management: 3. Post-development area (PS-2a) contains the area directed to the stormwater management system at the rear of the parcel. I have prepared a pollutant loading analysis using the Schueler Equation to calculate the pollutant loads in pounds for the water quality storm, then pollutant reduction values are applied. Figure 1 - Pollutant Loading Analysis PROJECT ADDRESS: Granby, Connecticut PLANNING & ZONING NUMBER: DATE: 10/12/2026 SCHUELER'S EQUATION: L = (0.226)*(P)*(Pj)*(Rv)*(C)*(A) Where: 0.226 CONVERSION FACTOR P WATER QUALITY STORM RAINFALL IN INCHES Pj FACTOR THAT CORRECTS FOR STORMS WHICH DO NOT GENERATE RUNOFF = 0.9 Rv RUNOFF COEFFICIENT Rv 0.05 + 0.009(I) I PERCENT IMPERVIOUS COVERAGE C POLLUTANT CONCENTRATION IN MG/L A SUB-WATERSHED AREA IN ACRES L POLLUTANT LOAD IN POUNDS P = 1.3 "/24-HOURS Pj = 0.9 SUB-WATERSHED AREA = 0.691 ACRES (Taken from site plan by engineer) PERCENT IMPERVIOUS AREA = 75.92 (Taken from site plan by engineer) Rv = 0.73328 LAND USE: High Density Residential (8+ units/acre) (See Sheet 2 for data) POLLUTANT CONCENTRATION IN MG/L FOR LAND USE Pollutant Load in pounds Concentration (mg/l) TSS 0.803884 lbs. 60 TP 0.004019 lbs. 0.3 TN 0.020097 lbs. 1.5 Zn 0.000938 lbs. 0.07 TPH 0.026796 lbs. 2 POLLUTANT RENOVATION ANALYSIS TREATMENT SYSTEM #1 Deep Sump Catch Basin (48" w/hooded outlet) (See Sheet 3 for data) Pollutant Load Removal Load Load Total Removal Rate Removed Remaining Percentage TSS 0.8038841 0.09 0.07235 0.731535 9% TP 0.0040194 0 0 0.004019 0% TN 0.0200971 0 0 0.020097 0% Zn 0.0009379 0.05 4.69E-05 0.000891 5% TPH 0.0267961 0.14 0.003751 0.023045 14% TREATMENT SYSTEM #2 Cultec/Stormtech Isolator Row (See sheet 3 for data) Pollutant Load Removal Adjustment Load Load Total Removal Rate Factor ** Removed Remaining Percentage TSS 0.7315345 0.8 1 0.585228 0.146307 82% TP 0.0040194 0.3 1 0.001206 0.002814 30% TN 0.0200971 0 1 0 0.020097 0% Zn 0.000891 0.55 1 0.00049 0.000401 57% TPH 0.0230447 0.92 1 0.021201 0.001844 93% TREATMENT SYSTEM #3 Infiltration Chambers (See sheet 3 for data) Pollutant Load Removal Adjustment Load Load Total Removal Rate Factor ** Removed Remaining Percentage TSS 0.1463069 0.75 0.1 0.010973 0.135334 83% TP 0.0028136 0.33 0.55 0.000511 0.002303 43% TN 0.0200971 0.19 0.8 0.003055 0.017042 15% Zn 0.0004009 0.86 0.25 8.62E-05 0.000315 66% TPH 0.0018436 0.9 0.1 0.000166 0.001678 94%
Page 23
3 Figure 2 - Pollutant Concentrations per land use POLLUTANT CONCENTRATION PER LAND COVER TYPE LAND COVER TYPE TSS TP TN Zn TPH Large Lot Residential (1 unit/5-10 acres) 60 0.3 1.5 0.07 2 Low Density Residential (1 or 2 units/acre) 60 0.3 1.5 0.07 2 Medium Density Residential (2-8 units per acre) 60 0.3 1.5 0.07 2 High Density Residential (8+ units/acre) 60 0.3 1.5 0.07 2 Commercial (Retail, Office, Restaurants) 55 0.21 1.2 0.13 2 Industrial 74 0.21 1.2 0.13 2 Institutional (schools, churches) 55 0.27 2 0.07 3 Open Urban Lane 50 0.25 1.3 0 0 Transportation (Highways only) 74 0.21 1.5 0.13 5 Earth Excavation (Mining) 350 0.5 1.5 0 0 Animal Feeding Operations 145 0.38 2.2 0 0 Agriculture (Breeding & Training Facilities) 145 0.38 2.2 0 0 Deciduous Forest 55 0.137 0.6 0 0 Evergreen Forest 55 0.137 0.6 0 0 Mixed Forest 55 0.137 0.6 0 0 Brush 55 0.137 0.6 0 0 Wetlands 0 0.38 1.5 0 0 Row & Garden Crops 357 1 2.92 0 0 Cropland 357 1 2.92 0 0 Orchards/Vineyards/Horticulture 357 1 2.92 0 0 Pasture Lands 145 0.38 2.2 0 0 Beaches 0 0.1 1.5 0 0 Bare Ground 100 0.38 1.5 0 0 None 0 0 0 0 0
Page 24
4 Figure 3 - Pollutant Removal Rates per Practice 4. The above analysis shows that the CT DEEP pollutant load reductions will not be met assuming that there is particulate matter which will encourage other pollutants to bind to silt and clay particles. a. TSS = 83% (90% required) b. TP = 43% (60% required) c. TN = 15% (40% required) 5. If no particulate matter (sand) is applied to the site, then the other non-point source pollutants, such as metals and hydrocarbons in addition to nitrogen and phosphorous will stay in soluble form. Soluble pollutants will not be removed by the proposed stormwater treatment system. A description of the impacts on aquatic systems as a result of increased pollutant loads is found in Appendix “A” of this report. POLLUTANT REMOVAL RATES FOR STORMWATER MANAGEMENT SYSTEMS STANDALONE RATES POLLUTANT REMOVAL RATES (PERCENT) SYSTEM TYPE TSS TP TN Zn TPH Bioretention (No underdrain) 83 34 12 67 65 Bioretention (Internal Water Storage) 83 34 75 67 65 Bioretention (WTR or Iron Filings) 83 80 12 67 65 Tree Filter 91 15 1 75 99 Surface Sand Filter 51 33 5 77 99 Dry Swale w/filter berms 58 50 65 40 82 Infiltration Trenches 75 33 19 86 90 Infiltration Chambers 75 33 19 86 90 Infiltration Basin 80 35 21 88 90 Cultec/Stormtech Isolator Row 80 50 0 55 92 Permeable Asphalt Pavement 99 60 0 75 99 Porous Concrete Pavement 97 0 0 99 99 Permeable Interlocking Pavers 99 99 99 99 99 Extended Detention Shallow Wetlands 69 51 27 62 72 Subsurface Gravel Wetland 99 58 98 99 99 Pond/Wetland System 65 51 27 58 81 Micro-pool Extended Detention Pond 65 51 27 58 81 Wet Pond/Pocket Pond 65 51 27 58 81 Shallow Wetlands 65 28 18 58 81 Wet Extended Detention Pond 65 51 27 58 81 Multiple Pond System 65 51 27 58 81 Wet Swale 75 20 40 38 65 Dry Detention Pond 30 10 2 30 38 Vegetated Filter Strip 52 10 13 67 45 Standard Catch Basin (24" sump) 5 0 0 2 7 Deep Sump Catch Basin (48" w/hooded outlet) 9 0 0 5 14 On-line Hydrodynamic Separator 29 0 0 21 42 Off-line Hydrodynamic Separator 75 0 0 26 64 LISD Urban Planter 63 22 34 65 65 LISD Curb Extension 63 22 34 65 62 ADS Water Quality Unit 68 0 0 64 58 ADS Detention/Infiltration Unit 99 0 0 99 99 Riprap Swale 52 0 0 65 32 Jellyfish Filter (online) 45 18 11 24 64 Jellyfish Filter (offline) 80 50 30 30 80 None 0 0 0 0 0
Page 25
5
6. The applicant claims that since they are containing the water quality volume in the
multiple stormwater systems, the pollutant loads are magically reduced as the following
language from the CT DEEP 2024 Storm Water Quality Manual seems to imply:
“Achieving these minimum required load reductions for sediment and nutrients is
assumed to provide adequate reductions of other stormwater pollutants including
floatable materials. However, it is important to note that if the full retention goal (i.e.,
Required Retention Volume) is met, then it is assumed pollutant reduction is also
achieved and individual pollutant calculations are not necessary.”
7. The above statement is not supported by science for the following reasons: Assumed is
not an engineering term. No evidence is found in the 2024 Manual to support the
above statement.
a. Treatment Processes: Effective removal relies on specific physical, chemical, and
biological processes occurring within the practice, such as sedimentation,
filtration, adsorption, and microbial action. Holding the water simply provides the
opportunity for these processes to work.
b. Design and Maintenance: The specific design of the practice (e.g., detention pond,
rain garden, permeable pavement) and its ongoing maintenance are vital for
ensuring these processes function correctly. Clogged systems or short-circuiting
flow paths can drastically reduce efficiency, even if the total volume is captured.
c. Pollutant Characteristics: Different pollutants behave differently. Suspended
solids often settle out well, while dissolved nutrients (like nitrogen and
phosphorus) or certain chemicals might require specialized treatment components
or longer retention times for effective removal.
d. Storm Dynamics: The WQV is typically designed for a specific "design storm"
(e.g., the first flush or a 90% storm event) [1]. Larger or more intense storms may
overwhelm the system, resulting in bypass or reduced treatment efficiency for the
excess volume.
e. Many stormwater practices found in the 2024 CT DEEP Storm Water Quality
Manual are incapable of providing the high level of reduction required. As an
example, a Dry Detention Basin is rated by CT DEEP to have Moderate TSS
removal and low TP and TP removal, so it does not matter how much water is
held in a Dry Detention Basin, the required pollutant load reductions will never be
met as the system cannot provide them.
8. Because of the extremely fast permeability rates in the underground stormwater system, a
pollutant loading analysis must be done to demonstrate that non-point source pollutants
will be reduced prior to introduction to the underground stormwater system as no
additional will occur in the coarse sandy soils.
Please contact my office if you have any questions concerning this information.
Respectfully submitted,
Trinkaus Engineering, LLC
Steven D. Trinkaus, PE
Page 26
6 APPENDIX “A” DISCUSSION OF ADVERSE ENVIRONMENTAL IMPACTS FROM INCREASED DISCHARGES OF NON-POINT SOURCE POLLUTANTS Litter and Trash Litter and trash will not directly cause a toxic impact on the environment; the presence of litter is an aesthetic issue that is not well received by the public. Additionally, litter and trash can become a food source for rats and other undesirable animals which can potentially cause public health issues. Figure 5.1.1 - Trash along a waterbody (Norwegian SciTech News) Total Suspended Solids (TSS) Total Suspended Solids are fine soil particles, such as silts and clay which are dissolved in water. In excessive amounts it causes turbidity in water. The turbidity blocks light in the water column, which causes reduced photosynthesis, which in turn reduces the oxygen levels in the water. Coarse and fine sediments can clog the gravel substrate in breeding streams thus affecting the biological community’s ability to reproduce. Common sources of TSS and sediment are runoff from construction sites, winter sanding operations, airborne dust via atmospheric deposition and decomposition of organic matter, such as leaves. Turbidity is measured as nephelometric turbidity units (NTU). A range of turbidity levels are shown in Figure 5.1.2 below.
Page 27
7 Figure 5.1.2 - Range of turbidity in water samples Nutrients Phosphorus and nitrogen are commonly found in non-point runoff with the primary source being lawn fertilizers. A secondary, but more important source of phosphorous and nitrogen is atmospheric deposition on impervious surfaces. It is well documented in professional literature that atmospheric deposition of nitrogen and phosphorous is a substantial amount of nutrients in post-development runoff. Atmospheric deposition is responsible for 55% of the total nitrogen, 15% of total phosphorous in post-development runoff. Excessive levels of phosphorus in freshwater systems are a concern as this increased phosphorus, both as particulate and soluble forms are responsible for excess growth of non- native aquatic plants and algae in lakes. As a result of increased nutrient loads, toxic algae blooms are becoming more prevalent in lakes in Connecticut. These toxic algae blooms have resulted in beach closures as exposure to the algae blooms can cause adverse health issues in humans. A further problem occurs when the non-native plants die in the water. The decomposition process of organic matter removes oxygen from the water column, thus reducing oxygen levels in the water. The reduced oxygen levels in the waterbody can result in fish dying. Nitrogen, in its many forms, is a direct human health hazard and an indirect hazard in some areas where it leads to the release of arsenic from sediments. While not a major concern for freshwater systems, nitrate can cause environmental impacts in tidal regions, even though the source of nitrate can be far away from coastal regions. Sources of nutrients are organic and inorganic fertilizers, animal manure, biosolids and failing sewage disposal systems which result in a surface discharge of effluent.
Page 28
8 Figure 5.1.3 - Phosphorus impacts on a freshwater pond Figure 5.1.4 - Impacts of dissolved inorganic nitrogen (www.yourgreenpal.com)
Page 29
9 Figure 5.1.5 - Impacts of nitrogen and phosphorus on aquatic systems Metals Metals in non-point source runoff are very toxic to aquatic life at low concentrations. The adverse effects of metals are significant for both aquatic and human health. Many metals can bioaccumulate in the environment, which can affect higher living organisms, such as humans. This condition occurred with mercury in tuna fish in the ocean years ago. While the concentration of zinc or copper in stormwater generally is not high enough to bother humans, these same concentrations can be deadly for benthic aquatic organisms. Many microorganisms in soil are especially sensitive to low concentrations of cadmium. Zinc, Copper, and Cadmium found in non-point source runoff result from the movement and wear and tear of automobiles on our roadways. The primary sources of metals are from vehicle brake pads and tires. Components of homebuilding such as metal roofs, gutters and downspouts can also be sources of metals in stormwater. Of the above discussed metals, zinc and copper are the two metals which are found dominantly in non-point source runoff. Metals commonly bind themselves to sediment and organic matter in stormwater and thus are transported to the receiving waters.
Page 30
10
Figure 5.1.6 - Primary source of zinc (automobile brake pads)
Hydrocarbons
Total Petroleum Hydrocarbons (TPH) are highly toxic in the aquatic environment,
especially to aquatic invertebrates. The primary sources of petroleum hydrocarbons are oil,
grease drops from an automobile, gas spills, and vehicle exhaust. Polycyclic Aromatic
Hydrocarbons (PAHs) are also toxic to aquatic life. PAHs can be discharged into the
environment by using coal tar asphalt sealants, commonly used by homeowners on residential
driveways. The movement of vehicles or people walking over the sealed driveway can release
dust particles containing PAH, which can then be washed off with the next rainfall into the
stormwater management system. PAHs are also generated by the burning of fossil fuels, and
the airborne particles are then deposited by atmospheric deposition on an impervious surface,
especially large flat roof areas. When it rains, the accumulations of PAHs due to atmospheric
deposition are carried off in the stormwater.
Figure 5.1.7 - Petroleum Hydrocarbons in Stormwater
Page 31
11 De-icing Agents In the past fifteen years, it has been common for states and municipalities to use deicing agents on roads prior to a snowfall event to prevent the snow from sticking to the road surface. These de-icing agents are applied in a liquid form called brine. The brines can consist of Sodium Chloride, Calcium Chloride, Magnesium Chloride and Potassium Chloride. Sodium Chloride is the most common deicing agent due to its availability and low cost. According to the University of Minnesota Extension Group deicing agents will cause the following adverse environmental impacts: 1. Water Quality a. One teaspoon of salt will pollute 5 gallons of water. b. Deicing agents will pollute the groundwater. c. Chloride in high amounts affects the oxygen levels and natural mixing of lakes and waterways and is toxic to fish, aquatic bugs and amphibians. d. Excessive use of de-icing agents can degrade concrete, asphalt, and natural stone, and will corrode metals. 2. Plants and Soils a. Dried up brown needles and leaves. b. Loss of foliage, buds, and branches. c. Premature plant death. d. Sodium causes clay particles in soil to expand, increasing soil compaction, reducing water infiltration and making it harder for roots to grow. e. High salinity can cause root damage and dehydration in many turfgrass species which result in yellowing death. Figure 5.1.8 - Application of deicing agents on road ( www.harmonydeicing.com)
Page 32
12 Thermal Impacts Impervious surfaces, such as roofs and paved areas, such as residential driveways can heat up during sunny days and hold onto this heat. When rainfall occurs on these heated surfaces, the resulting runoff will have a highly elevated temperature resulting from the heat transference from the impervious surface to the runoff. As this heated runoff is discharged into receiving water, the temperature of the receiving water is raised to a level which can exceed the temperature tolerance limits for fish and invertebrates, thus lowering their survival rates. Elevated water temperatures will also contribute to reduced oxygen levels in the water. While temporary spikes in temperature in cold water stream may not have an adverse impact on fish species, frequent or prolonged spikes in water temperature will have adverse impacts on fish species. Figure 5.1.9 - Fish kills due to increased thermal levels Pathogens Pathogens are bacteria and viruses, which can cause disease in humans. Most pathogens are found in discharges from overflowing sanitary sewers or in combined sanitary/stormwater systems which is not applicable to the Town of Stonington. In communities such as Stonington, the primary source of pathogens in stormwater is pet waste which is not picked up by dog walkers along roadways. Dog poop which washes into a storm drain are the common source of both fecal coliform and enterococci bacteria which are used as indicators for the presence of pathogenic organisms, yet their presence does not mean a pathogen is present, just that there is a higher risk of being present.
Page 33
13 Figure 5.1.10 - Primary source of pathogens in stormwater
Page 34
TOWN OF GRANBY Incorporated 1786 15 North Granby Road Granby, Connecticut 06035-2102 1 October 14, 2026 Forrest Devine 129 Lovers Lane Granville, MA 01034 RE: 37 Hartford Avenue – F. Devine – Permit application for regulated activities in connection with the development of a 16-unit apartment building and associated site improvements. Dear Mr. Devine: Please be advised that on October 14, 2026, the Inland Wetlands and Watercourses Commission (IWWC) Agent approved the subject application in accordance with the application and supporting documentation received to date. The following are the conditions of this approval. 1. Notification Requirements a. The Office of Community Development shall be notified at least 48 hours prior to the start of any activities. b. When barrier erosion controls have been installed prior to earth disturbance activities. c. When invasive species have been removed. d. When plantings have been installed. e. Upon completion of project activities. f. Prior to the removal of erosion controls 2. Municipal Inspection a. Town staff shall inspect installed erosion controls prior to the start of work that results in earth disturbance activities, this includes, but is not limited to, grubbing and stump removal. b. Standard inspections of the approved improvements shall be made throughout active construction and upon final stabilization of exposed soils to ensure regulatory compliance and protection of wetland resource areas. c. A site inspection shall be completed to witness that invasive species have been adequately removed, please refer to sheet D-6 “Compliance Notes” revised to 8/25/26 for additional invasive species control details. d. A site inspection shall be completed to document successful installation and survivability of proposed plantings. 3. Prior to the start of work, the applicant shall submit a bond in the amount of $5,000 to the Town of Granby for payments made to the Town Wetlands Officer for monitoring the development for compliance with this approval. Should the costs exceed this amount the applicant will be billed for the difference. Any funds not used for the project will be remitted to the applicant at the conclusion of the project. As used in this condition, the term Town Wetlands Officer includes any person or firm designated by the Director of Community Development for the purposes of monitoring the development activities to assure compliance with this approval and the IWWC Regulations. 4. A Mylar copy of the approved plans signed by the IWWC Chair shall be filed on the Land Records in the Office of the Town Clerk, prior to the issuance of a building permit.
Page 35
37 Hartford Avenue – Apartments 9/9/26 Approval Letter 2 5. All work shall be in conformance with the approval and application materials as submitted for this Permit Approval. Any modifications to the approved plans must be reviewed and approved by the Granby Inland Wetlands and Watercourses Commission or their designated Agent. 6. Erosion controls shall be maintained until the site has achieved permanent stabilization. Permanent stabilization is defined as 70% permanent vegetation covering over 90% of the area. A stockpile of erosion controls shall remain on site to prepare controls as necessary. The IWWC shall be notified in writing at least 48 hours in advance of erosion controls being removed. 7. Excavated soil shall not be brought off property without the notification and approval of the Office of Community Development. The applicant shall supply the destination in writing for any excavated soil removed from the property. 8. Only clean fill, free of invasive species, shall be brought on-site. Utilizing on-site fill will reduce, if not eliminate the potential for the introduction and potential colonization of new invasive species into this area of the watershed. 9. A Mylar copy of the final As-Built Drawing, depicting the approved wetland boundary and limit of vegetative clearing; shall be filed on the Land Records in the Office of the Town Clerk, prior to the issuance of a Certificate of Occupancy. 10. This permit is valid for a period of 5 years from the date of issuance. If you have any questions, please call the Office of Community Development at your earliest convenience. Sincerely, John Laudati Granby IWWC Chairman
Page 36
Page 37
Page 38
Page 39
Page 40
Page 41
Page 42
Page 43
Page 44
Page 45
Page 46
Page 47
1 199 Barn Door Hills Road, Granby, CT – Project Description In support of the “Application for Inland Wetlands & Watercourses Activity” filed with the Town of Granby’s Office of Community Development, Inland Wetlands and Watercourses Commission, on October 5, 2026, by Joseph Lambert, Lambert’s Lawn Care (“Lambert”), Lambert submits the following brief description of the project under review: The property located at and known as 199 Bard Door Hills Road in Granby, Connecticut (“Property”), is a residential property bordering Kettle Pond Lane and Barn Door Hills Road that contains a culvert intended to allow water to flow into a small pond located on the Property. However, the growth of various invasive species of plant life has significantly obstructed the flow of water into this pond, resulting in the pond suffering from chronic and abnormally low water levels. These conditions have been compounded by the accumulation of “muck” and sediment in the pond, as well as erosion of the pond’s borders (which have been caused, at least in part, by the invasive plants growing in and around the pond). Lambert’s proposed project for the Property is intended to restore the Property’s pond to its proper condition and to otherwise establish systems to maintain this condition in the future. This will include clearing out all obstructions limiting the flow of water from the culvert to the pond, removing all invasive plant life that has grown in and around the pond, adding rock formations and silt fencing to stabilize the borders of the pond, applying all-natural “Muckout” to the pond to introduce healthy bacteria and enzyme to the pond’s biome in order to improve conditions for frogs, fish, and other natural wildlife, and adding a small fountain to aerate and oxygenate the water, among other related work. This project will also include other work to improve the overall condition of the Property, including the removal of dead and/or diseased trees that present a hazard to the home on the Property and the surrounding roadways, clearing other sections of the Property of invasive plant life, removing other small structures on the Property (such as a small, raised garden bed), and remediating garden beds located throughout the Property. For further information on the precise nature of the project and the work to be performed at the Property, please see the description of work to be performed at each location on the Property and the photographs attached to this project description below:
Page 48
2 Further Description of Project & Locations of Work 1.) Southwest corner of property: Clear all invasive growth obstructing water flow to culvert. Refresh existing stone to prevent regrowth. 2.) West side of property - slighting into north side of property: Clear all invasive growth. Lightly top-dress with soil and plant grass. This will allow these areas to be mowed and maintained to prevent invasive regrowth. Current pond water levels are low even after large volumes of rain. This overgrowth is preventing water from reaching the pond. 3.) Northeast corner of property: Clear invasive growth. Vines are climbing and killing trees close to Barndoor Hills Road. Plant grass to prevent invasive regrowth. Install small perennial flower garden to beautify street. 4.) Around house: Cleanout all existing garden beds and add new mulch. 5.) Front of house: Remove 1x hazardous/dead Ash tree. 6.) South side of property by Kettle Pond Ln: Remove all dead plum trees killed by black knot disease. Add low level perennial garden to beautify street. Road visibility should Increase. 7.) Corner of driveway: Existing patio to be power washed and joints to be resealed. General rehabilitation. 8.) Existing Pond: Goal is to enhance aquatic wildlife habitat, maintain aquatic plants & encourage water to flow into pond. Current pond conditions are poor as water levels are lowering even with large amounts of rainwater. • Clear all invasive growth around the borders of pond - Water has been obstructed by invasive overgrowth. • We would add boulders to stabilize banks of pond (some boulders are already here). • Install drainage behind boulders with stone to encourage water to access pond. • Potentially run a water line from well with (float & back flow preventor) to add clean water to pond when levels are too low. • Add "Muckout" to existing pond adding natural bacteria & Enzymes to pond reducing muck and encouraging healthier environment for frogs / fish & aquatic life. ALL Natural. • Add fountain to center of pond to aerate and oxygenate water. • Add silt fence around outside border of pond. Seed around exterior of pond with straw erosion matting to prevent movement into pond.
Page 49
3 Photographs of Preexisting Condition of the Property
Page 50
4
Page 51
5
Page 52
6 Photographs of Property & Description of Work
Page 53
7
Page 54
8
Page 55
9
Page 56
10
Page 57
11
Page 58
12
Page 59
13
Page 60
14
Page 61
15
Page 62
16
Page 63
17
Page 64
18
Page 65
19
Page 66
20
Page 67
21
Page 68
22
Page 69
23
Page 70
24
Page 71
25
Page 72
26
Page 73
27
Page 74
28 Artistic Rendering of Pond after Project Completion
Page 75
29 Product Used to Restore Pond Biome
Page 76
Page 77
Page 78
Page 79
Page 80
TOWN OF GRANBY Incorporated 1786 15 North Granby Road Granby, Connecticut 06035-2102 October 14, 2026 Town of Granby 15 North Granby Road Granby, CT 06035 RE: 53 West Granby Road and 215 Salmon Brook Street – Town of Granby – Permit application to construct a walking path and associated improvements within a regulated area. Dear Town of Granby: Please be advised that on October 14, 2026, the Inland Wetlands and Watercourses Commission (IWWC) approved the subject application in accordance with the application and supporting documentation received to date. The following are the conditions of this approval. 1. The Office of Community Development shall be notified at least 48 hours prior to the start of any construction activities. 2. Town staff shall inspect installed erosion controls prior to the start of any work that results in earth disturbance activities, this includes, but is not limited to, grubbing and stump removal. 3. All work shall be in conformance with this approval and application materials as submitted for this Permit Approval. Any modifications to the approved plans must be reviewed and approved by the Granby Inland Wetlands and Watercourses Commission or their designated Agent. 4. No materials may be deposited outside of the work area on the project site, without written approval from the IWWC or their designated Agent. 5. Erosion controls shall be maintained until the site has achieved permanent stabilization. Permanent stabilization is defined as 70% permanent vegetation covering over 90% of the area. A stockpile of erosion controls shall remain on site to be installed, as necessary. The IWWC shall be notified in writing at least 48 hours in advance of erosion controls being removed. 6. Excavated soils shall not be brought off-property without the notification and approval of the Office of Community Development. The applicant shall supply the destination in writing for any excavated soil to be removed from the property. 7. This permit is valid for a period of 5-years from the date of issuance. 8. Upon completion of construction and site stabilization, the IWWC shall be notified in writing that work is complete, and a final inspection may be completed at that time. If you have any questions, please call the Office of Community Development at your earliest convenience. Sincerely, John Laudati Granby IWWC Chairman
Page 81
Location Map Scale: 1"=500' TOWN OF GRANBY SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING 215 Salmon Brook Street Granby, Connecticut Date: September 3, 2026 Revised: October 6, 2026 INLAND WETLANDS PERMIT SET Owner: Town of Granby 15 North Granby Road Granby, Connecticut 06035 Civil Engineer: Kevin Clark, PEL Town Engineer 15 North Granby Road Granby, Connecticut 06035 (860) 844-5318 townengineer@granby-ct.gov Surveyor: BSC Group 665 Winding Brook Drive Glastonbury, Connecticut 06033 (860) 652-8227 List of Drawings: - Sheet OA-1 Sheet C-1 to C-4 Sheet DE-1 to DE-3 Cover Overall Plan Plan Notes & Details Site
Page 82
N/F TOWN OF GRANBY 53 West Granby Road Vol. 94 Pg. 21 map G-42 /block 74 /lot 99 N/F TOWN OF GRANBY 53 West Granby Road Vol. 94 Pg. 21 map G-42 /block 74 /lot 99 Approximate Edge of Water Approximate Edge of Water Approximate Edge of Water Approximate Edge of Water West Branch Salmon Brook (PUBLIC VARIABLE WIDTH) WEST GRANBY ROAD (S.R. #20) West Branch Salmon Brook N/F Paul D. & Cathy A Biagini 51 West Granby Road Vol. 353 Pg. 1086 map G-42 /block 74 /lot 98 N/F Anthony Indino 47 West Granby Road Vol. 423 Pg. 809 Vol. 420 Pg. 175 map G-42 /block 74 /lot 96 N/F Thomas Randall Clay 45 West Granby Road Vol. 221 Pg. 951 Vol. 190 Pg. 789map G-42 /block 74 /lot 95 N/F William G. & Jonna L Hallam 49 West Granby Road Vol. 371 Pg. 1211 Vol. 349 Pg. 208 map G-42 /block 74 /lot 97 N/F TOWN OF GRANBY 215 Salmon Brook Street Vol. 74 Pg. 176 map H-42 /block 74 /lot 87 101 38E 29A 38C 29A 38E 38C 100 101 Approximate Edge of Water Approximate Edge of WaterWest Branch Salmon Brook EXIST. SOIL LINE EXIST. PROP. LINE INLAND WETLANDS REGULATED AREA MATCH MARK MATCH MARK MATCH MARK MATCH MARK MATCH MARK MATCH MARK AREA 1 AREA 1 AREA 2 AREA 3 AREA 5 AREA 4 GRANBY TOWN HALL 15 NORTH GRANBY ROAD GRANBY, CONNECTICUT 06035 PHONE: (860) 844-5318 FAX: (860) 844-5325 TOWN OF GRANBY ENGINEERING DEPARTMENT SCALE:DATE:JOB #:SHEET: 1"=100'SEPTEMBER 3, 2026 2025.G01OA-1 OVERALL PLAN TOWN OF GRANBY SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING 215 SALMON BROOK STREET GRANBY, CONNECTICUT NO.DATEDESCRIPTION REVISIONS SHEET C-1 SHEET C-2 SHEET C-3 SHEET C-4 UTILITY WARNING The locations of existing underground utilities are shown in an approximate way only and have not been independently verified by the Owner or its representative. Utilities not shown on this plan may exist. The Contractor shall determine the exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages which might be occasioned by the Contractor's failure to exactly locate and preserve any and all underground utilities. The Contractor shall use CALL BEFORE YOU DIG, 811, https://www.cbyd.com/, prior to any construction activity.
Page 83
100 101 PROP. 5-FT WIDE HMA WALK SIDEWALK BASE LINE 10 0+0184.96 2+00G.B. 185.41 3+00G.B. 186.08 4+00G.B. 187.17 EXIST. SIDEWALK PROP. PARK BENCHW/CONC. SLAB APPROX. GRADING LIMIT WALKCROSSSLOPE MATCH MARK MATCH MARK PROP. CONC.SIDEWALK RAMP5-FT LONG 0+05 END CONC. RAMPEL=185.06 0+50G.B. 184.95 C 9 L 30 L 31 C 10 L 32 C 11 L 33 SF SF SF SF SF SF SF PROP. SOIL STOCKPILE AREA SF SF SF SF SF SF SF C.E. SEDIMENT & EROSION CONTROL MEASURES MEASUREPLAN KEY CONSTRUCTION ENTRANCECE DUST CONTROLDC EROSION CONTROL MATTINGECM GEOTEXTILE SILT FENCEGSF HAY BALE BARRIERHB INLET PROTECTIONIP LAND GRADINGLG LANDSCAPE MULCHLM LANDSCAPE PLANTINGLP MULCH FOR SEEDMS OUTLET PROTECTIONOP PERMANENT LINED WATERWAYPW PERMANENT SEEDINGPS PERMANENT TURF REINFORCEMENT MAT TRM RIP RAPRR SEDIMENT CONTROL LOGSCL STONE CHECK DAMSCD STONE SLOPE PROTECTIONSSP SURFACE ROUGHENINGSR TOPSOILINGTO LIST OF ABBREVIATIONS: BIT. CONC. BITUMINOUS CONCRETE C.B.CATCH BASIN CONC.CONCRETE C.P.E.P.-SCORRUGATED POLYETHYLENE PIPE, W/SMOOTH INTERIOR EXIST.EXISTING G.BGRADE BREAK INV. INVERT L.F.LINEAR FEET M.H.MANHOLE PVMT.PAVEMENT P.V.P.POLYVINYL CHLORIDE PROP.PROPOSED TYP.TYPICAL LEGEND UTILITY POLE WETLANDS BUILDING SETBACK LINE PROPERTY LINE PROPOSED SPOT GRADE CATCH BASIN MANHOLE EASEMENT CONTOUR STORM SEWER CURB SFSFSFSILT FENCE PROPOSED TYPICAL EXISTING TYP.PROP. UPLAND REVIEW AREA SLSLSEDIMENT CONTROL LOG SOIL BOUNDARY & TYPE EXIST. TREE TO BE REMOVED 43B CONTRACT LIMIT LINE 4+80G.B. 229.4 GRANBY TOWN HALL 15 NORTH GRANBY ROAD GRANBY, CONNECTICUT 06035 PHONE: (860) 844-5318 FAX: (860) 844-5325 TOWN OF GRANBY ENGINEERING DEPARTMENT SCALE:DATE:JOB #:SHEET: 1"=20'SEPTEMBER 3, 2026 2025.G01C-1 PLAN TOWN OF GRANBY SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING 215 SALMON BROOK STREET GRANBY, CONNECTICUT NO.DATEDESCRIPTION REVISIONS UTILITY WARNING The locations of existing underground utilities are shown in an approximate way only and have not been independently verified by the Owner or its representative. Utilities not shown on this plan may exist. The Contractor shall determine the exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages which might be occasioned by the Contractor's failure to exactly locate and preserve any and all underground utilities. The Contractor shall use CALL BEFORE YOU DIG, 811, https://www.cbyd.com/, prior to any construction activity.
Page 84
Approximate Edge of Water Approximate Edge of Water West Branch Salmon Brook N/F TOWN OF GRANBY 215 Salmon Brook Street Vol. 74 Pg. 176 map H-42 /block 74 /lot 87 DEMO EXIST. TREE (TYP.) PROP. 5-FT WIDE HMA WALK SIDEWALK BASE LINE 10 DEMO EXIST. TREE (TYP.) 4+00G.B. 187.17 5+00G.B. 188.19 5+50G.B. 188.15 6+00G.B. 188.59 6+70G.B. 190.28 8+50G.B. 189.71 PROP. PARK BENCHW/CONC. SLAB INLAND WETLANDS REGULATED AREA APPROX. GRADING LIMIT WALKCROSSSLOPE MATCH MARK MATCH MARK MATCH MARK MATCH MARK C 11 L 33 C 12 L 34 L 35 C 13 L 36 AREA 1 AREA 2 AREA 3 AREA 5 AREA 4 PROP. WETLANDSMITIGATION AREA (TYP.)AREA 6 SEDIMENT & EROSION CONTROL MEASURES MEASUREPLAN KEY CONSTRUCTION ENTRANCECE DUST CONTROLDC EROSION CONTROL MATTINGECM GEOTEXTILE SILT FENCEGSF HAY BALE BARRIERHB INLET PROTECTIONIP LAND GRADINGLG LANDSCAPE MULCHLM LANDSCAPE PLANTINGLP MULCH FOR SEEDMS OUTLET PROTECTIONOP PERMANENT LINED WATERWAYPW PERMANENT SEEDINGPS PERMANENT TURF REINFORCEMENT MAT TRM RIP RAPRR SEDIMENT CONTROL LOGSCL STONE CHECK DAMSCD STONE SLOPE PROTECTIONSSP SURFACE ROUGHENINGSR TOPSOILINGTO LIST OF ABBREVIATIONS: BIT. CONC. BITUMINOUS CONCRETE C.B.CATCH BASIN CONC.CONCRETE C.P.E.P.-SCORRUGATED POLYETHYLENE PIPE, W/SMOOTH INTERIOR EXIST.EXISTING G.BGRADE BREAK INV. INVERT L.F.LINEAR FEET M.H.MANHOLE PVMT.PAVEMENT P.V.P.POLYVINYL CHLORIDE PROP.PROPOSED TYP.TYPICAL LEGEND UTILITY POLE WETLANDS BUILDING SETBACK LINE PROPERTY LINE PROPOSED SPOT GRADE CATCH BASIN MANHOLE EASEMENT CONTOUR STORM SEWER CURB GSFGSFGSFSILT FENCE PROPOSED TYPICAL EXISTING TYP.PROP. UPLAND REVIEW AREA SLSLSEDIMENT CONTROL LOG SOIL BOUNDARY & TYPE EXIST. TREE TO BE REMOVED 43B CONTRACT LIMIT LINE 4+80G.B. 229.4 GRANBY TOWN HALL 15 NORTH GRANBY ROAD GRANBY, CONNECTICUT 06035 PHONE: (860) 844-5318 FAX: (860) 844-5325 TOWN OF GRANBY ENGINEERING DEPARTMENT SCALE:DATE:JOB #:SHEET: 1"=20'SEPTEMBER 3, 2026 2025.G01C-2 PLAN TOWN OF GRANBY SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING 215 SALMON BROOK STREET GRANBY, CONNECTICUT NO.DATEDESCRIPTION REVISIONS UTILITY WARNING The locations of existing underground utilities are shown in an approximate way only and have not been independently verified by the Owner or its representative. Utilities not shown on this plan may exist. The Contractor shall determine the exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages which might be occasioned by the Contractor's failure to exactly locate and preserve any and all underground utilities. The Contractor shall use CALL BEFORE YOU DIG, 811, https://www.cbyd.com/, prior to any construction activity. 10/06/26 PER WETLANDS AGENT COMMENTS
Page 85
N/F TOWN OF GRANBY 53 West Granby Road Vol. 94 Pg. 21 map G-42 /block 74 /lot 99 101 Approximate Edge of Water Approximate Edge of WaterWest Branch Salmon Brook 0+00 1+00 PC: 0+69.48 PT: 0+82.32 PROP. 5-FT WIDE HMA WALK SIDEWALK BASE LINE 10 L 9 C 8 EXIST. PATH TO BE REBUILT TO 6-FT WIDE WOODS TRAIL SIDEWALK BASE LINE 11 9+50G.B. 190.30 10+50G.B. 190.30 11+50G.B. 189.67 12+20G.B. 190.41 13+00G.B. 190.57 14+00G.B. 190.33 END 15+14190.91 PROP. PARK BENCHW/CONC. SLAB APPROX. GRADING LIMIT WALKCROSSSLOPE MATCH MARK MATCH MARK APPROX. LOCATION OFPROP. HORSE PATHCLEAR 5-FT WIDE PATH MATCH MARK MATCH MARK C 14 L 37 C 15 L 38 PROP. SOIL STOCKPILE AREA SF SF SF SF SF SF SF SF SF SF AREA 1 SL PROP. WETLANDSMITIGATION AREA (TYP.) SEDIMENT & EROSION CONTROL MEASURES MEASUREPLAN KEY CONSTRUCTION ENTRANCECE DUST CONTROLDC EROSION CONTROL MATTINGECM GEOTEXTILE SILT FENCEGSF HAY BALE BARRIERHB INLET PROTECTIONIP LAND GRADINGLG LANDSCAPE MULCHLM LANDSCAPE PLANTINGLP MULCH FOR SEEDMS OUTLET PROTECTIONOP PERMANENT LINED WATERWAYPW PERMANENT SEEDINGPS PERMANENT TURF REINFORCEMENT MAT TRM RIP RAPRR SEDIMENT CONTROL LOGSCL STONE CHECK DAMSCD STONE SLOPE PROTECTIONSSP SURFACE ROUGHENINGSR TOPSOILINGTO LIST OF ABBREVIATIONS: BIT. CONC. BITUMINOUS CONCRETE C.B.CATCH BASIN CONC.CONCRETE C.P.E.P.-SCORRUGATED POLYETHYLENE PIPE, W/SMOOTH INTERIOR EXIST.EXISTING G.BGRADE BREAK INV. INVERT L.F.LINEAR FEET M.H.MANHOLE PVMT.PAVEMENT P.V.P.POLYVINYL CHLORIDE PROP.PROPOSED TYP.TYPICAL LEGEND UTILITY POLE WETLANDS BUILDING SETBACK LINE PROPERTY LINE PROPOSED SPOT GRADE CATCH BASIN MANHOLE EASEMENT CONTOUR STORM SEWER CURB SFSFSFSILT FENCE PROPOSED TYPICAL EXISTING TYP.PROP. UPLAND REVIEW AREA SLSLSEDIMENT CONTROL LOG SOIL BOUNDARY & TYPE EXIST. TREE TO BE REMOVED 43B CONTRACT LIMIT LINE 4+80G.B. 229.4 GRANBY TOWN HALL 15 NORTH GRANBY ROAD GRANBY, CONNECTICUT 06035 PHONE: (860) 844-5318 FAX: (860) 844-5325 TOWN OF GRANBY ENGINEERING DEPARTMENT SCALE:DATE:JOB #:SHEET: 1"=20'SEPTEMBER 3, 2026 2025.G01C-3 PLAN TOWN OF GRANBY SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING 215 SALMON BROOK STREET GRANBY, CONNECTICUT NO.DATEDESCRIPTION REVISIONS UTILITY WARNING The locations of existing underground utilities are shown in an approximate way only and have not been independently verified by the Owner or its representative. Utilities not shown on this plan may exist. The Contractor shall determine the exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages which might be occasioned by the Contractor's failure to exactly locate and preserve any and all underground utilities. The Contractor shall use CALL BEFORE YOU DIG, 811, https://www.cbyd.com/, prior to any construction activity.
Page 86
N/F TOWN OF GRANBY 53 West Granby Road Vol. 94 Pg. 21 map G-42 /block 74 /lot 99 Approximate Edge of Water Approximate Edge of Water EXISTINGRESIDENCE West Branch Salmon Brook (PUBLIC VARIABLE WIDTH) WEST GRANBY ROAD (S.R. #20) 38E 29A 38C 6+31 2+00 3+00 4+00 5+00 6+00 PI: 1+28.88 PI: 1+84.69 PI: 2+30.00 PI: 2+46.67 PI: 2+59.16 PI: 2+86.32 PI: 3+01.22 PI: 3+48.62 PI: 3+96.68 PI: 4+31.73 PI: 4+59.63 PI: 4+80.93 PI: 5+07.26 PI: 5+31.68 PI: 5+69.10 PI: 5+96.67 2+30B.S. 196.29 2+41.70T.S. 203.22 2+69.87B.S. 204.38 2+81.57T.S. 211.31 4+98.50G.B. 229.52 L 10 L 11 L 12 L 13 L 14 L 15 L 17 L 18 L 19 L 20 L 21 L 22 L 23 L 24 L 25 L 26 3+29.74B.S. 213.46 3+36.76T.S. 217.87 3+84.93B.S. 220.03 3+91.95T.S. 224.44 L 16 1+30G.B. 191.29 PROP. OVERLAPPING TIMBER STEPS7 RISERS, OVERALL LENGTH =12' APPROX. GRADING LIMIT PROP. OVERLAPPING TIMBER STEPS7 RISERS, OVERALL LENGTH = 12' PROP. OVERLAPPING TIMBER STEPS11 RISERS, OVERALL LENGTH = 16'-8" PROP. OVERLAPPING TIMBER STEPS11 RISERS, OVERALL LENGTH = 16'-8" APPROX. LOCATION OF PROP. HORSE PATH.CLEAR 5-FT WIDE PATH AS DIRECTED MATCH MARK MATCH MARK GSF GSF GSF GSF GSF GSF ECM (TYP.) SCL ADD EDUCATIONAL SIGNAGE AT TRAILHEAD TO BROOK ECM (TYP.) EXIST. PATH TO BE REBUILT TO 6-FT WIDE WOODS TRAIL SEDIMENT & EROSION CONTROL MEASURES MEASUREPLAN KEY CONSTRUCTION ENTRANCECE DUST CONTROLDC EROSION CONTROL MATTINGECM GEOTEXTILE SILT FENCEGSF HAY BALE BARRIERHB INLET PROTECTIONIP LAND GRADINGLG LANDSCAPE MULCHLM LANDSCAPE PLANTINGLP MULCH FOR SEEDMS OUTLET PROTECTIONOP PERMANENT LINED WATERWAYPW PERMANENT SEEDINGPS PERMANENT TURF REINFORCEMENT MAT TRM RIP RAPRR SEDIMENT CONTROL LOGSCL STONE CHECK DAMSCD STONE SLOPE PROTECTIONSSP SURFACE ROUGHENINGSR TOPSOILINGTO LIST OF ABBREVIATIONS: BIT. CONC. BITUMINOUS CONCRETE C.B.CATCH BASIN CONC.CONCRETE C.P.E.P.-SCORRUGATED POLYETHYLENE PIPE, W/SMOOTH INTERIOR EXIST.EXISTING G.BGRADE BREAK INV. INVERT L.F.LINEAR FEET M.H.MANHOLE PVMT.PAVEMENT P.V.P.POLYVINYL CHLORIDE PROP.PROPOSED TYP.TYPICAL LEGEND UTILITY POLE WETLANDS BUILDING SETBACK LINE PROPERTY LINE PROPOSED SPOT GRADE CATCH BASIN MANHOLE EASEMENT CONTOUR STORM SEWER CURB GSFGSFGSFSILT FENCE PROPOSED TYPICAL EXISTING TYP.PROP. UPLAND REVIEW AREA SLSLSEDIMENT CONTROL LOG SOIL BOUNDARY & TYPE EXIST. TREE TO BE REMOVED 43B CONTRACT LIMIT LINE 4+80G.B. 229.4 GRANBY TOWN HALL 15 NORTH GRANBY ROAD GRANBY, CONNECTICUT 06035 PHONE: (860) 844-5318 FAX: (860) 844-5325 TOWN OF GRANBY ENGINEERING DEPARTMENT SCALE:DATE:JOB #:SHEET: 1"=20'SEPTEMBER 3, 2026 2025.G01C-4 PLAN TOWN OF GRANBY SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING 215 SALMON BROOK STREET GRANBY, CONNECTICUT NO.DATEDESCRIPTION REVISIONS UTILITY WARNING The locations of existing underground utilities are shown in an approximate way only and have not been independently verified by the Owner or its representative. Utilities not shown on this plan may exist. The Contractor shall determine the exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages which might be occasioned by the Contractor's failure to exactly locate and preserve any and all underground utilities. The Contractor shall use CALL BEFORE YOU DIG, 811, https://www.cbyd.com/, prior to any construction activity. 10/06/26 PER WETLANDS AGENT COMMENTS
Page 87
SIDEWALK BASELINE #10 & PORTION OF #11 @ EDGE OF WALK DIRECTION OF SLOPE AS NOTED, 1.5% TYP. 2.0% MAX. (NOT TO SCALE) BITUMINOUS CONCRETE SIDEWALK DETAIL 2" HMA S0.375(TRAFFIC LEVEL 1) 8" GRANULAR FILL COMPACTED IN TWO LIFTS WIDTH = 5'-0" 3" (TYP.) COMPACTED SUBGRADE (NOT TO SCALE) WOODS TRAIL/STONE DUST PATH DETAIL 3" COMPACTED AASHTO #10 STONE DUST 4" COMPACTED N0. 4 STONE AGGREGATE WIDTH = 6'-0" 3" (TYP.) COMPACTED SUBGRADE PLAN AA B B 2'-0" 8'-0" 3'-0" 6'-1/8" 5'-0" 11'-0" ATTACH BENCH TO SLAB W/ 4 - 3/8" x 3-1/2" CONCRETE EXPANSION ANCHOR BOLTS 1'-0" 2'-0" SECTION B-B BENCH NOTES: 1. BENCH TO BE A EVEREST SERIES 8-FT. PARK BENCH WITH BACK - SURFACE MOUNT MODEL 595-6002 AS MANUFACTURED BY HIGHLAND PRODUCTS GROUP/THE PARK CATALOG, 931 VILLAGE BLVD STE 905-354, WEST PALM BEACH, FL 33409, OR EQUIVALENT 2. SLAB TO BE CONSTRUCTED AS A CONC. WALK CONFORMING TO FORM 818. BENCH EDGE OF SIDEWALK MATCH GRADE BIT. SIDEWALK (NOT TO SCALE) PARK BENCH W/CONCRETE SLAB SECTION A-A SLOPE = 1.5% 1 2" EXPANSION JOINT WITH PRE-MOLDED EXPANSION JOINT MATERIAL 5 8" x 12" LONG SMOOTH, STEEL DOWEL 1' O/C - FREE AT ONE END CLASS "C" CONCRETE SURFACE FINISHED WITH A WOOD FLOAT OR BY OTHER APPROVED MEANS 1 2" EXPANSION JOINT WITH PRE-MOLDED EXPANSION JOINT MATERIAL CONC. SLAB 5" 8" AFTER COMPACTION GRANULAR FILL PLACED IN TWO COURSES. COMPACTED SUBGRADE 1 2" EXPANSION JOINT WITH PRE-MOLDED EXPANSION JOINT MATERIAL EXPANSION JOINT PLAN EDGE OF PAVEMENT SIDEWALK 4" 6" COMPACTED SUBGRADE GRANULAR FILL PLACED IN TWO COURSES. 6" x 6" #10 W.W.M. A A 2' DETECTABLE WARNING SIDEWALK WIDTH AS NOTED (5' MIN.) SLOPE ADJACENT LAWN/LANDSCAPED AREA AS NECESSARY TO MEET THE EDGE OF THE RAMP CONCRETE RAMP SLOPE DOWN TO PAVEMENT. RAMP SLOPE TO BE 2.0%. RAMP SURFACE TO BE BROOM FINISH PERPENDICULAR TO DIRECTION OF TRAVEL. 5'-0" EXIST. ROAD PAVEMENT CLASS 'F' CONCRETE SLOPE 1/4" PER FOOT ELEVATION AT GUTTER SHALL BE FLUSH WITH ROADWAY PAVEMENT 2' DETECTABLE WARNING SECTION A-A CONCRETE WALK RAMP DETAIL - W/NO EXIST. CURB AT PAVEMENT (NOT TO SCALE) OVERLAPPING TIMBER STEP DETAIL ADDITIONAL NOTES: 1. TIMBER TO BE 8" X 8", #2 GROUND CONTACT ROUGH SAWN PRESSURE TREATED LUMBER. 2. RISERS TO BE 7-1/2". TREADS TO BE 14" 3. TIMBERS TO BE SET ON A 4-INCH COMPACTED STONE (CTDOT NO. 4) BASE. 4. TREAD INFILL BETWEEN THE RISERS TO BE AASHTO #10 STONE DUST. NO.DATEDESCRIPTION REVISIONS 8/16/24 PER CTDOT COMMENTSGRANBY TOWN HALL 15 NORTH GRANBY ROAD GRANBY, CONNECTICUT 06035 PHONE: (860) 844-5318 FAX: (860) 844-5325 TOWN OF GRANBY ENGINEERING DEPARTMENT SCALE:DATE:JOB #:SHEET: 1"=20'SEPTEMBER 3, 2026 2025.G01DE-1 DETAILS & NOTES TOWN OF GRANBY SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING 215 SALMON BROOK STREET GRANBY, CONNECTICUT
Page 88
(NOT TO SCALE) SILT FENCE DETAIL (GSF) SLOPE 6"x6" TRENCH. REPLACE AND COMPACT WITH EXCAVATED MATERIAL 12" (MIN.) 30" (MIN.) PREFABRICATED SEDIMENT FENCE. U.S. SILT & SITE SUPPLY/GETSCO CT36112130 OR EQUIVALENT (NOT TO SCALE) SEDIMENT LOG DETAIL (ON BARE SOIL)DOWN SLOPE NOTES: 1. CURLEX SEDIMENT LOGS AS MANUFACTURED BY AMERICAN EXCELSIOR COMPANY. SEDIMENT LOG SIZE TO BE 9-INCHES UNLESS OTHERWISE NOTED ON THE PLANS. 2. TRENCH OPTION IS MOST APPLICABLE IN LOOSE, UNCONSOLIDATED SOILS. 3. STAKE SIZE: 1 1 8" X 1 1 8" X 30" WOODEN STAKES ARE RECOMMENDED FOR 6", 9", AND 12" SEDIMENT LOGS. 1 1 8" X 1 1 8" X 48" WOODEN STAKES ARE RECOMMENDED FOR 20" SEDIMENT LOGS. 4. INSTALLATION TO BE AS PER THE MANUFACTURERS INSTRUCTIONS. 16" (MIN.) CURLEX ®SEDIMENT LOGS WOOD STAKE WOOD STAKE TO ONLY PENETRATE NETTING, NOT CURLEX ®MATERIAL SLOPE SURFACE PLANTING DETAIL NOTE: PRUNE LOWER BRANCHES OF TREE BACK TO MAIN TRUNK SO THAT REMAINING HEAD IS APPROX. 1/2 OF TOTAL TREE HEIGHT 2xBALL RADIUS 1'± MULCH EDGE STAKING AND PLANTING TREE WRAP TRUNK OF TREE WITH STANDARD TREE WRAPPING PAPER (CRAPE) STARTING FROM BOTTOM WINDING UPWARDS UNTIE BALLING STRING FROM BASE OF TRUNK ALLOW THIN LAYER OF SOIL TO COVER BALL DEPRESSION FOR WATER ACCUMULATION BERM SIZE TO BE PROMINENT COMPACT OUTER EDGE WITH FOOTPRINT GROUND TREATED STAKES (3 STAKES SPACED EQUIDISTANT) PEEL BACK BURLAP BACKFILL WITH 4 PARTS TOPSOIL, 1 PART PEAT & 1 PART MANURE RUBBER HOSE AT CONTACT POINTS 6" (MIN.) (NOT TO SCALE) CONSTRUCTION ENTRANCE DETAIL (CE) LENGTH = AS SHOWN ON PLAN (MIN.=30') WIDTH = AS SHOWN ON PLAN (MIN. =12') REMOVE TOPSOIL & ORGANICS PRIOR TO PLACING GEOTEXTILE & STONE CONNDOT N0. 3 CRUSHED GRAVEL GEOTEXTILE PAVED ROAD OR DRIVE NO.DATEDESCRIPTION REVISIONS GRANBY TOWN HALL 15 NORTH GRANBY ROAD GRANBY, CONNECTICUT 06035 PHONE: (860) 844-5318 FAX: (860) 844-5325 TOWN OF GRANBY ENGINEERING DEPARTMENT SCALE:DATE:JOB #:SHEET: 1"=20'SEPTEMBER 3, 2026 2025.G01DE-2 DETAILS & NOTES TOWN OF GRANBY SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING 215 SALMON BROOK STREET GRANBY, CONNECTICUT
Page 89
GENERAL EROSION AND SEDIMENT CONTROL NOTES: 1. EROSION AND SEDIMENT CONTROL MEASURES SHALL CONFORM TO, "CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL, THE COUNCIL ON SOIL AND WATER CONSERVATION, ADOPTED MARCH 30, 2024," AS AMENDED. 2. THE SEDIMENT AND EROSION CONTROL NOTES AND DETAILS INCLUDED IN THE CONSTRUCTION DOCUMENTS MAY REFER TO INFORMATION LOCATED IN THE GUIDELINES. THE CONTRACTOR SHALL HAVE A COPY OF THE GUIDELINES AVAILABLE FOR REFERENCE DURING CONSTRUCTION. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION, MAINTENANCE, AND REMOVAL OF ALL SEDIMENTATION AND EROSION CONTROL MEASURES. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING THE NEARBY STREETS OF ANY SEDIMENT OR CONSTRUCTION DEBRIS ORIGINATING FROM THIS PROJECT. 5. IF EXCESS MATERIAL FROM THE PROPOSED CONSTRUCTION IS TO BE REMOVED FROM THE SITE, THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS FOR ITS DEPOSITION. 6. THE CONSTRUCTION ENTRANCE, IF NOTED, AND THE SEDIMENT CONTROLS LOCATED AT THE PERIMETER OF THE PROPOSED EDGE OF DISTURBANCE(S), SHALL BE INSTALLED PRIOR TO ANY CONSTRUCTION ACTIVITY. INSTALLATION SHALL BE AS PER THE MANUFACTURERS' INSTRUCTIONS AND AS DETAILED ON THESE PLANS. 7. ALL STORM DRAINAGE INLETS ARE TO BE PROTECTED FROM SEDIMENT INTRUSION. SEDIMENT SHALL BE REMOVED FROM ALL DRAINAGE STRUCTURES, PIPE SYSTEMS, OUTLET STRUCTURES, RIP RAP, AND CHANNELS. 8. ALL STOCKPILES OF SOIL ARE TO BE ENCIRCLED WITH SILT FENCE. 9. THE CONTRACTOR SHALL EMPLOY TEMPORARY EROSION CONTROL MEASURES SUCH AS, SILT FENCE, HAY BALES, STONE BARRIERS, EROSION CONTROL MATTING, SEDIMENT TRAPS, DEWATERING BASINS, AND TEMPORARY STORMWATER DIVERSIONS, AS NECESSARY DURING CONSTRUCTION, TO PROTECT THE SITE AND ADJACENT PROPERTIES FROM EROSION. 10. ALL LOCATIONS, INCLUDING SWALES, LAWN AREAS, AND STORM SEWER DISCHARGE POINTS, THAT ARE TO RECEIVE A CONCENTRATED FLOW OF STORMWATER, ORIGINATING FROM SURFACE FLOW OR STORM SEWER SYSTEMS, SHALL BE STABILIZED AND PROTECTED FROM EROSION PRIOR TO RECEIVING THE WATER. 11. DAMAGED SECTIONS OF SEDIMENT BARRIERS SHALL BE REPLACED BY THE CONTRACTOR. SEDIMENT DEPOSITS SHALL BE REMOVED BY THE CONTRACTOR WHEN THEY REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIER. SEDIMENT SHALL BE REMOVED IN A MANNER THAT DOES NOT CAUSE ADDITIONAL EROSION OR POLLUTION. 12. AT A MINIMUM, ALL SEDIMENT CONTROL MEASURES SHALL BE INSPECTED BY THE CONTRACTOR AT LEAST ONCE A WEEK AND WITHIN 24 HOURS OF THE END OF A STORM WITH A RAINFALL AMOUNT OF 0.5 INCHES OR GREATER. REPAIR SEDIMENT CONTROL MEASURE AS NECESSARY. 13. DISTURBED AREAS ARE TO BE STABILIZED AS SOON AS POSSIBLE AFTER DISTURBANCE. WHEN GRADING OF THE DISTURBED AREA WILL BE SUSPENDED FOR A PERIOD OF 30 OR MORE CONSECUTIVE DAYS, BUT LESS THAN 5 MONTHS, STABILIZE THE SITE WITHIN 7 DAYS OF THE SUSPENSION OF GRADING THROUGH THE USE OF MULCH OR OTHER MATERIALS APPROPRIATE FOR USE AS A TEMPORARY SOIL PROTECTOR. FOR SURFACES THAT ARE NOT TO BE REWORKED WITHIN 5 MONTHS BUT WILL BE REWORKED WITHIN 1 YEAR, USE TEMPORARY SEEDING, MULCH FOR SEED OR WHEN SLOPES ARE LESS THAN 3:1, WOOD CHIPS, BARK CHIPS OR SHREDDED BARK. FOR SURFACES THAT ARE TO BE REWORKED AFTER 1 YEAR, USE PERMANENT SEEDING AND MULCH FOR SEED. 14. EXCAVATED STUMPS AND CUT TREES ARE TO BE CHIPPED AND STOCKPILED FOR FUTURE USE, OR REMOVED TO AN OFF-SITE DISPOSAL AREA. BRUSH AND SLASH ARE TO BE CHIPPED AND STOCKPILE FOR FUTURE USE OR REMOVED FROM THE SITE. EXCAVATED STUMPS, CUT TREES, BRUSH, AND SLASH, ARE NOT TO BE BURIED ON-SITE. LAND GRADING (LG) DESIGN CRITERIA SLOPE DEFINED SLOPE IS THE RELATIONSHIP OF HORIZONTAL DISTANCE TO VERTICAL DISTANCE AND IS REFERENCED AS EITHER HORIZONTAL TO VERTICAL, A RATIO OF HORIZONTAL:VERTICAL OR A PERCENTAGE OF THE VERTICAL DIVIDED BY THE HORIZONTAL. SLOPE GRADIENT LIMITATIONS VEGETATED MOWED SLOPES: WHERE A SLOPE IS TO BE VEGETATED AND MOWED, THE SLOPE SHALL NOT BE STEEPER THAN 3:1; FLATTER SLOPES ARE PREFERRED BECAUSE OF SAFETY FACTORS RELATED TO THE OPERATION OF EQUIPMENT. VEGETATED UNMOWED SLOPES: WHERE A SLOPE IS TO BE VEGETATED BUT NOT MOWED, THE SLOPE SHALL NOT BE STEEPER THAN 2:1. STRUCTURALLY STABILIZED SLOPES: FOR SLOPES STEEPER THAN 2: 1OR WHEN SLOPES ARE STEEPER THAN 3: 1 AND THE CHANGE IN ELEVATION EXCEEDS 15 FEET WITHOUT A CROSS SLOPE BENCH, ENGINEERED STRUCTURAL DESIGN FEATURES SHALL BE INCORPORATED. APPLICABLE ENGINEERED MEASURES MAY INCLUDE THOSE FOUND IN THE STABILIZATION STRUCTURES FUNCTIONAL GROUP (SEE FIGURE 3-4, SELECTION MATRIX) OR OTHER STRUCTURAL MEASURES DESIGNED BY THE ENGINEER, EXCEPTIONS: SLOPE LIMITATIONS MAY BE INCREASED PROVIDING DETAILED SOIL MECHANICS ANALYSIS CALCULATIONS ARE PERFORMED WHICH CONFIRM AN ACCEPTABLE SAFETY FACTOR FOR THE FINISHED SLOPE. SLOPE LENGTH LIMITATIONS AND REVERSE SLOPE BENCHES REVERSE SLOPE BENCHES ARE REQUIRED WHENEVER THE VERTICAL HEIGHT OF ANY SLOPE STEEPER THAN 3:1 EXCEEDS 15 FEET, EXCEPT WHEN ENGINEERED SLOPE STABILIZATION STRUCTURES MEASURES ARE INCLUDED IN THE SLOPE AND/OR A DETAILED SOIL MECHANICS ANALYSIS CALCULATION HAS CONFIRMED AN ACCEPTABLE FACTOR OF SAFETY EXISTS FOR THE FINISHED SLOPE. CONTROLLING WATER MOVEMENT MAKE PROVISIONS TO SAFELY CONDUCT SURFACE RUNOFF TO STORM DRAINS, PROTECTED OUTLETS OR TO STABLE WATERCOURSES TO ENSURE THAT RUNOFF WILL NOT DAMAGE SLOPES OR OTHER GRADED AREAS. SURFACE WATER: MAXIMUM ALLOWABLE OVERLAND FLOW DISTANCE IN FEET TO THE TOP OF THE DESIGNED SLOPE WITH NO DIVERSION OF SURFACE WATER IS DETERMINED BY USE OF THE FORMULA: A=X (15-Y) A = MAXIMUM OVERLAND FLOW DISTANCE IN FEET ABOVE THE CREST OF THE DESIGNED SLOPE B = MAXIMUM HORIZONTAL DISTANCE IN FEET SHALL NOT EXCEED 15X. X = SIDE SLOPE; HORIZONTAL DISTANCE IN FEET TO ONE FOOT VERTICAL (E.G., = 2 FOR DESIGNED SLOPE 2:1) Y = HEIGHT OF DESIGNED SLOPE IN FEET MEASURED VERTICALLY FROM TOE ELEVATION OF THE DESIGNED SLOPE TO TOP OF CUT OR FILL FOR THE DESIGNED SLOPE. EITHER DIVERT SURFACE WATER FROM THE FACE OF ALL CUT AND FILL SLOPES BY THE USE OF DIVERSIONS, DITCHES AND DRAINAGE WAYS OR OTHERWISE CONVEY IT DOWN THE SLOPE BY THE USE OF OTHER APPROPRIATE MEASURES. SURFACE WATER MAY BE ALLOWED TO FLOW DOWN CUT AND FILL SLOPES WHEN ALL OF THE FOLLOWING CONDITIONS EXIST: ·THE LENGTH OF OVERLAND FLOW (IN FEET) TO THE CREST OF THE DESIGNED SLOPE DOES NOT EXCEED THE DISTANCE "A"; ·THE FACE OF THE SLOPE IS ALREADY STABLE OR THE FACE OF THE SLOPE IS PROTECTED FROM SURFACE RUNOFF UNTIL IT IS STABILIZED; ·THE FACE OF THE SLOPE IS NOT SUBJECTED TO ANY CONCENTRATED FLOWS OF SURFACE WATER FROM NATURAL DRAINAGE WAYS AND STRUCTURES SUCH AS GRADED DRAINAGE WAYS AND DOWNSPOUTS; AND ·THE MAXIMUM TOTAL HORIZONTAL OVERLAND FLOW (A) PLUS SLOPE DISTANCE (B) DOES NOT EXCEED 15 TIMES THE SIDE SLOPE (X) OF THE CUT OR FILL SLOPES. SUBSURFACE WATER: SUBSURFACE DRAINAGE SHALL BE PROVIDED WHERE NECESSARY TO INTERCEPT GROUNDWATER SEEPAGE THAT WOULD OTHERWISE ADVERSELY AFFECT SLOPE STABILITY OR CREATE EXCESSIVELY WET SITE CONDITIONS THAT WOULD HINDER OR PROHIBIT DESIRED VEGETATIVE GROWTH. OTHER DESIGN LIMITATIONS SLOPES SHALL NOT BE CREATED CLOSE TO PROPERTY LINES SO AS TO ENDANGER ADJOINING PROPERTIES WITHOUT ADEQUATELY PROTECTING SUCH PROPERTIES AGAINST EROSION, SEDIMENTATION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED DAMAGE. SOIL MATERIAL USED FOR EARTH FILL SHALL BE OBTAINED FROM AN APPROVED BORROW PIT OR OTHER DESIGNATED AREA. THE FILL MATERIAL SHALL BE FREE OF BRUSH, RUBBISH, LARGE ROCKS, LOGS, STUMPS, BUILDING DEBRIS, AND OTHER OBJECTIONABLE MATERIAL THAT WOULD INTERFERE WITH, OR PREVENT CONSTRUCTION OF, SATISFACTORY FILLS. IT SHOULD BE FREE OF STONES OVER 2 INCHES IN DIAMETER WHERE COMPACTED BY HAND OR MECHANICAL TAMPERS OR OVER 6 INCHES IN DIAMETER WHERE COMPACTED BY ROLLERS OR OTHER EQUIPMENT. FROZEN MATERIAL SHALL NOT BE PLACED IN THE FILL NOR SHALL THE FILL MATERIAL BE PLACED ON A FROZEN FOUNDATION. STOCKPILES, BORROW AREAS AND SPOIL AREAS SHALL BE LOCATED AWAY FROM STEEP SLOPES AND SURFACE WATERS AND SHALL BE SHOWN ON THE PLANS. SOIL STOCKPILES SHALL BE SUBJECT TO THE PROVISIONS OF THIS MEASURE. ALL DISTURBED AREAS SHALL BE STABILIZED IN ACCORDANCE WITH THE E&S MEASURES CONTAINED IN THESE GUIDELINES. INSTALLATION REQUIREMENTS 1. PROTECT ALL GRADED OR DISTURBED AREAS INCLUDING SLOPES DURING CLEARING AND CONSTRUCTION IN ACCORDANCE WITH THE APPROVED EROSION AND. SEDIMENT CONTROL PLAN UNTIL THEY ARE PERMANENTLY STABILIZED. 2. CONSTRUCT AND MAINTAIN ALL EROSION AND SEDIMENT CONTROLS IN ACCORDANCE WITH THE APPROVED EROSION AND SEDIMENT CONTROL PLAN. 3. CLEAR AND GRUB AREA TO BE GRADED. IN FILLED AREAS WHERE FILL EXCEEDS 5 FEET IN DEPTH, GRUBBING MAY NOT BE REQUIRED. 4. STRIP AND STOCKPILE TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION IN AMOUNTS NECESSARY TO COMPLETE FINISHED GRADING OF ALL EXPOSED AREAS. 5. USE ONLY FILL MATERIALS THAT ARE FREE OF BRUSH, RUBBISH, ROCKS, LOGS, STUMPS, BUILDING DEBRIS AND OTHER OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR PREVENT CONSTRUCTION OF SATISFACTORY FILLS. FROZEN MATERIAL OR SOFT, SATURATED OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE INCORPORATED INTO FILLS. ROCK FILL AND OTHER CLEAN FILL! MAY BE USED PROVIDING IT DOES NOT INTERFERE WITH THE CONSTRUCTION OF STRUCTURES. 6. PLACE AND COMPACT ALL FILL IN LAYERS NOT EXCEEDING 1 FOOT IN THICKNESS. NO EMBANKMENT LAYER SHALL BE DEPOSITED ON SURFACES OF SNOW OR ICE NOR SHALL IT BE PLACED ON FROZEN OR UNSTABLE SURFACES. WHERE EMBANKMENTS ARE TO BE CONSTRUCTED ON SLOPES STEEPER THAN 3:1, DEEPLY SCARIFY THE EXISTING SLOPE OR CUT INTO STEPS BEFORE FILLING IS BEGUN. IF FILL PLACEMENT IS NOT COMPLETED WITHIN 1 DAY, THEN INSTALL TEMPORARY EROSION AND SEDIMENT CONTROLS, SUCH AS TEMPORARY FILL BERM, AS NECESSARY TO REDIRECT RUNOFF WATER AWAY FROM THE UNSTABLE SLOPE UNTIL FILL PLACEMENT RESUMES. 7 COMPACT ALL FILLS AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. FILL THAT IS INTENDED TO SUPPORT BUILDINGS, STRUCTURES, CONDUITS AND OTHER FACILITIES SHALL BE COMPACTED IN ACCORDANCE WITH THE DESIGN SPECIFICATIONS. 8. PRIOR TO FINAL SEEDING, ROUGHEN SLOPES 2:1 THROUGH 5:1 TO REDUCE RUNOFF VELOCITIES UNLESS THE ENGINEER DIRECTS OTHERWISE. 9. IF AREAS ARE TO BE TOPSOILED, REFER TO THE TOPSOILING MEASURE (TO). 10. DURING ALL PHASES OF CONSTRUCTION KEEP REVERSE SLOPE BENCHES FREE OF SEDIMENT. 11. THE TREATMENT OF SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE REVIEWED AND ADDRESSED BY THE ENGINEER IN ACCORDANCE WITH GENERALLY ACCEPTED ENGINEERING STANDARDS. 12. APPLY PERMANENT SOIL STABILIZATION MEASURES TO ALL GRADED AREAS WITHIN 7 DAYS OF ESTABLISHING FINAL GRADE. IF FINAL GRADING IS TO BE DELAYED FOR MORE THAN 30 DAYS AFTER LAND DISTURBANCE ACTIVITIES CEASE, TEMPORARY SOIL STABILIZATION MEASURES (TSP) SHALL BE APPLIED IN ACCORDANCE WITH THE TEMPORARY SEEDING (TS) MEASURE. MAINTENANCE: INSPECT AND MAINTAIN ALL EROSION AND SEDIMENT MEASURES IMPLEMENTED DURING LAND GRADING OPERATIONS ACCORDING TO THEIR RESPECTIVE REQUIREMENTS. TOPSOILING (TO), TEMPORARY (TS) AND PERMANENT SEEDING (PS): 1. TOPSOILING, TEMPORARY AND PERMANENT SEEDING, AND MULCHING MEASURES SHALL CONFORM TO, "2002, CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL, THE CONNECTICUT COUNCIL ON SOIL AND WATER CONSERVATION," AS AMENDED. 2. PROVISIONS SHALL BE MADE FOR SURFACE AND SUBSURFACE DRAINAGE, AS NEEDED, AND FOR THE DISPOSAL OF RUNOFF WITHOUT CAUSING EROSION. 3. TOPSOIL SHALL INCLUSIVELY MEAN A SOIL: ·MEETING ONE OF THE FOLLOWING SOIL TEXTURAL CLASSES ESTABLISHED BY THE UNITED STATES DEPARTMENT OF AGRICULTURE CLASSIFICATION SYSTEM BASED UPON THE PROPORTION SAND, SILT, AND CLAY SIZE PARTICLES AFTER PASSING A 2 MILLIMETER (MM) SIEVE AND SUBJECTED TO A PARTICLE SIZE ANALYSIS: LOAMY SAND, INCLUDING COARSE, LOAMY FINE, AND LOAMY VERY FINE SAND, LOAMY SAND, INCLUDING COARSE, LOAMY FINE, AND LOAMY VERY FINE SAND, SANDY LOAM, INCLUDING COARSE, FINE AND VERY FINE SANDY LOAM, LOAM, OR SILT LOAM WITH NOT MORE THAN 60% SILT; ·CONTAINING NOT LESS THAN 6% AND NOT MORE THAN 20% ORGANIC MATTER AS DETERMINED BY LOSS-ON-IGNITION OF OVEN DRIED SAMPLES DRIED AT 105 DEGREES CENTIGRADE; ·POSSESSING A PH RANGE 6.0-7.5, EXCEPT IF THE VEGETATIVE PRACTICE BEING USED SPECIFICALLY REQUIRES A LOWER PH, THEN PH MAY BE ADJUSTED ACCORDING; ·HAVING SOLUBLE SALTS NOT EXCEEDING 500 PPM; AND ·THAT IS LOOSE AND FRIABLE AND FREE FROM REFUSE, STUMPS, ROOTS, BRUSH, WEEDS, FROZEN PARTICLES, ROCKS, AND STONES OVER 1.25 INCHES IN DIAMETER; AND ANY MATERIAL THAT WILL PREVENT THE FORMATION OF A SUITABLE SEEDBED OR PREVENT SEED GERMINATION AND PLANT GROWTH. TOPSOIL MAY BE OF NATURAL ORIGIN OR MANUFACTURED BY BLENDING COMPOSTED ORGANIC MATERIALS WITH ORGANIC DEFICIENT SOILS, MINERAL SOILS, SAND AND LIME SUCH THAT THE RESULTING SOIL MEETS THE MATERIAL SPECIFICATIONS LISTED ABOVE. ALL TOPSOIL SHALL BE ANALYZED BY A RECOGNIZED SOIL TESTING LABORATORY FOR ORGANIC CONTENT, PH AND SOLUBLE SALTS REQUIREMENTS GIVEN ABOVE. 4. PRIOR TO PLACING THE TOPSOIL, LOOSEN THE SUBGRADE BY DISCING OR SCARIFYING THE SURFACE TO A DEPTH OF TWO (2) INCHES. TOPSOIL SHALL BE APPLIED TO AT LEAST A MINIMUM COMPACTED DEPTH OF FOUR INCHES. COMPACTING IS TO INSURE A GOOD BOND WITH THE SUBGRADE AND TO OBTAIN A UNIFORM SEED BED. DO NOT OVER COMPACT. DO NOT APPLY TOPSOIL WHEN IN A FROZEN OR MUDDY CONDITION, OR WHEN THE SUBGRADE IS EXCESSIVELY WET. 5. SEEDBED PREPARATION: a. APPLY LIMESTONE AND FERTILIZER ACCORDING TO SOIL TESTS. IF SOIL TESTING IS NOT FEASIBLE, OR WHERE TIMING IS CRITICAL, FERTILIZER MAY BE APPLIED AT THE RATE OF 300 POUNDS PER ACRE USING 10-10-10 OR EQUIVALENT. IN ADDITION, 300 POUNDS OF 38-0-0 OR EQUIVALENT OF SLOW RELEASE NITROGEN MAY BE USED FOR TOP DRESSING. APPLY GROUND LIMESTONE AT THE RATE OF THREE (3) TONS PER ACRE. b. WORK LIME AND FERTILIZER INTO THE SOIL AS NEARLY AS PRACTICAL TO A DEPTH OF FOUR (4) INCHES WITH A DISK, SPRING TOOTH HARROW OR OTHER SUITABLE EQUIPMENT. THE FINAL HARROWING OR DISCING OPERATION SHOULD BE ON THE GENERAL CONTOUR. CONTINUE TILLAGE UNTIL A REASONABLY UNIFORM, FINE SEEDBED IS PREPARED. ALL BUT CLAY OR SILTY SOILS AND COARSE SANDS SHOULD BE ROLLED TO FIRM THE SEEDBED WHERE FEASIBLE. c. REMOVE FROM THE SURFACE ALL STONES TWO (2) INCHES OR LARGER IN ANY DIMENSION. REMOVE ALL OTHER DEBRIS SUCH AS WIRE, CABLE, TREE ROOTS, PIECES OF CONCRETE, CLODS, LUMPS, OR OTHER UNSUITABLE MATERIAL. 7. RECOMMENDED SEEDING DATES: PERMANENT: APRIL 15 THROUGH JUNE 15 AUGUST 15 THROUGH SEPTEMBER 15 TEMPORARY: MARCH 1 TO JUNE 15 AUGUST 1 TO OCTOBER 1 8. RECOMMENDED SEED MIXTURES: THE SEED MIXTURE SHALL BE ONE RECOMMENDED BY THE NATIONAL RESOURCES CONSERVATION SERVICE OR THE FOLLOWING: APPLICATIONSEED MIXTURELBS./1000 SQ. FT. LAWNSKENTUCKY BLUEGRASS1.8 CREEPING RED FESCUE1.8 PERENNIAL RYE GRASS0.4 ROADSIDES OR SLOPESCREEPING RED FESCUE1.9 REDTOP0.2 TALL FESCUE OR SMOOTH BROMEGRASS1.9 SLOPES (NO MOWING)CREEPING RED FESCUE2.1 REDTOP0.2 CROWN VETCH WITH INOCULANT1.7 OR FLAT PEA WITH INOCULANT(3.5) TEMPORARYWINTER RYE3.0 OR ANNUAL RYEGRASS3.0 9. SEEDING: a. APPLY SEED UNIFORMLY BY HAND, CYCLONE SEEDER, DRILL, CULTIPACKER TYPE SEEDER OR HYDROSEEDER (SLURRY INCLUDING SEED AND FERTILIZER). NORMAL SEEDING DEPTH IS FROM 1/4 TO 1/2 INCH. HYDROSEEDINGS WHICH ARE MULCHED MAY BE LEFT ON SOIL SURFACE. b. WHERE FEASIBLE, EXCEPT WHERE EITHER A CULTIPACKER TYPE SEEDER OR HYDROSEEDER IS USED, THE SEEDBED SHOULD BE FIRMED FOLLOWING SEEDING OPERATIONS WITH A ROLLER, OR LIGHT DRAG. SEEDING OPERATIONS SHOULD BE ON THE CONTOUR. c. IF SEEDING CANNOT BE DONE WITHIN THE SEEDING DATES, USE TEMPORARY MULCHING WITH AN APPLICATION RATE OF 2.5 TO 3 TONS/ACRE TO PROTECT THE SITE AND DELAY SEEDING UNTIL THE NEXT RECOMMENDED SEEDING PERIOD. 10. STABILIZING APPLIED TOPSOIL: IMMEDIATELY FOLLOWING TOPSOIL APPLICATIONS, PROTECT THE TOPSOIL FROM EROSION BY EITHER SODDING, SEEDING AND/OR MULCHING. ADDITIONAL STABILIZATION MEASURES MAY BE REQUIRED. GENERAL NOTES: 1. THE CONTRACTOR SHALL USE "CALL BEFORE YOU DIG, 1-800-922-4455" PRIOR TO ANY CONSTRUCTION ACTIVITY. 2. CONSTRUCTION METHODS AND MATERIALS, SHALL CONFORM TO THE REGULATIONS OF CONNDOT FORM 818.AS AMENDED. 3. THE CONTRACTOR SHALL VERIFY ALL LINES AND GRADES PRIOR TO ANY CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND INCURRING THE COST OF ALL REQUIRED PERMITS, INSPECTIONS, CERTIFICATES, ETC. 5. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR JOBSITE SAFETY AND SHALL COMPLY WITH ALL FEDERAL AND STATE OCCUPATIONAL SAFETY AND HEALTH AUTHORITY (O.S.H.A.) REGULATIONS. 6. THE CONTRACTOR SHALL PROVIDE, INSTALL, MAINTAIN AND REMOVE ALL SHORING, BRACING AND OTHER ITEMS NECESSARY TO RETAIN BANKS OR EXCAVATIONS AND PREVENT CAVE-INS AND DISPLACEMENT OF ADJOINING GROUND. SHORING AND BRACING SHALL BE ENTIRELY INDEPENDENT OF FOOTINGS. 7. THE CONTRACTOR SHALL KEEP TRENCHES FREE FROM STANDING WATER AT ALL TIMES UNTIL PERMANENT WORK IS IN PLACE. ALL NECESSARY WELL-POINTING AND/OR PUMPING SHALL BE PERFORMED AND MAINTAINED AT THE CONTRACTOR'S EXPENSE. 6. ALL EXPOSED CURB ENDS ARE TO BE TAPERED. 7. SAW CUT EXISTING CURBS AND PAVEMENT WHERE THEY MEET PROPOSED CURBS OR PAVEMENT. MULCH FOR SEED (MS) APPLICABILITY: USED WITH TEMPORARY SEEDING AND PERMANENT SEEDING MEASURES. MATERIALS MULCH FOR SEED, INCLUDING TACKIFIERS AND NETTINGS USED TO ANCHOR MUCH, SHALL BE: ·BIODEGRADABLE OR PHOTO-DEGRADABLE WITHIN 2 YEARS HUT WITHOUT SUBSTANTIAL DEGRADATION OVER A PERIOD OF 6 WEEKS, ·FREE OF CONTAMINANTS THAT POLLUTE THE AIR OR WATERS OF THE STATE WHEN PROPERLY APPLIED, ·FREE OF FOREIGN MATERIAL, COARSE STEMS AND ANY SUBSTANCE TOXIC TO PLANT GROWTH OR WHICH INTERFERES WITH SEED GERMINATION, AND ·CAPABLE OF BEING APPLIED EVENLY SUCH THAT IT PROVIDES 80%-95% SOIL COVERAGE AND STILL ADHERES TO THE SOIL SURFACE, DOES NOT SLIP ON SLOPES WHEN IT RAINS OR IS WATERED, DOES NOT BLOW OF SITE, DISSIPATES RAINDROP SPLASH, HOLDS SOIL MOISTURE, MODERATES SOIL TEMPERATURES AND DOES NOT INTERFERE WITH SEED GROWTH. TYPES OF MULCHES WITHIN THIS SPECIFICATION INCLUDE, BUT ARE NOT LIMITED TO: HAY: THE DRIED STEMS AND LEAFY PARTS OF PLANTS CUT AND HARVESTED, SUCH AS ALFALFA, CLOVERS, OTHER FORAGE LEGUMES AND THE FINER STEMMED, LEAFY GRASSES. STEM LENGTH SHOULD NOT AVERAGE LESS THAN 4 INCHES. HAY THAT CAN BE WINDBLOWN MUST BE ANCHORED. PREFERRED MULCH WHEN SEEDING OCCURS OUTSIDE OF THE RECOMMENDED SEEDING DATES. STRAW: CUT AND DRIED STEMS OF HERBACEOUS PLANTS, SUCH AS WHEAT BARLEY, CEREAL RYE, OR BROOM. THE AVERAGE STEM LENGTH SHOULD NOT BE LESS THAN 4 INCHES. STRAW THAT CAN BE WINDBLOWN SHOULD BE ANCHORED TO HOLD IT IN PLACE. CELLULOSE FIBER: FIBER ORIGIN IS EITHER VIRGIN WOOD, POST-INDUSTRIAL/PRE-CONSUMER WOOD OR POST CONSUMER WOOD COMPLYING WITH MATERIALS SPECIFICATION (COLLECTIVELY REFERRED TO AS "WOOD FIBER"), NEWSPAPER, KRAFT PAPER, CARDBOARD (COLLECTIVELY REFERRED TO AS "PAPER FIBER") OR A COMBINATION OF WOOD AND PAPER FIBER. PAPER FIBER, IN PARTICULAR, SHALL NOT CONTAIN BORON, WHICH INHIBITS SEED GERMINATION. THE CELLULOSE FIBER MUST BE MANUFACTURED IN SUCH A MANNER THAT AFTER THE ADDITION TO AND AGITATION IN SLURRY TANKS WITH WATER, THE FIBERS IN THE SLURRY BECOME UNIFORMLY SUSPENDED TO FORM A HOMOGENEOUS PRODUCT. SUBSEQUENT TO HYDRAULIC SPRAYING ON THE GROUND, THE MULCH SHALL ALLOW FOR THE ABSORPTION AND PERCOLATION OF MOISTURE AND SHALL NOT FORM A TOUGH CRUST SUCH THAT IT INTERFERES WITH SEED GERMINATION OR GROWTH. GENERALLY APPLIED WITH TACKIFIER AND FERTILIZER. REFER TO MANUFACTURER'S SPECIFICATIONS FOR APPLICATION RATES NEEDED TO ATTAIN 80%-95% COVERAGE WITHOUT INTERFERING WITH SEED GERMINATION OR PLANT GROWTH. NOT RECOMMENDED AS A MULCH FOR USE WHEN SEEDING OCCURS OUTSIDE OF THE RECOMMENDED SEEDING DATES. OTHER MULCHES ALSO INCLUDE CORN STALKS AND OTHER SIMILAR ORGANIC MATERIALS PROVIDED THEY MEET THE REQUIREMENTS LISTED IN THE FIRST PARAGRAPH OF THIS SECTION. DOES NOT INCLUDE MATERIALS SUCH AS WOOD CHIPS, BARK CHIPS OR COCOA HULLS. TACKIFIERS WITHIN THIS SPECIFICATION INCLUDE, BUT ARE NOT LIMITED TO: WATER SOLUBLE MATERIALS THAT CAUSE MULCH PARTICLES TO ADHERE TO ONE ANOTHER, GENERALLY CONSISTING OF EITHER A NATURAL VEGETABLE GUM BLENDED WITH GELLING AND HARDENING AGENTS OR A BLEND OF HYDROPHILIC POLYMERS, RESINS, VISCOSIFIERS, STICKING AIDS AND GUMS. GOOD FOR AREAS INTENDED TO BE MOWED. CELLULOSE FIBER MULCH MAY BE APPLIED AS A TACKIFIER TO OTHER MULCHES, PROVIDED THE APPLICATION IS SUFFICIENT TO CAUSE THE OTHER MULCHES TO ADHERE TO ONE ANOTHER. EMULSIFIED ASPHALT IS SPECIFICALLY PROHIBITED FOR USE AS TACKIFIER DUE TO ITS POTENTIAL FOR CAUSING WATER POLLUTION FOLLOWING ITS APPLICATION. NETTINGS WITHIN THIS SPECIFICATION INCLUDE, BUT ARE NOT LIMITED TO: PREFABRICATED OPENWORK FABRICS MADE OF CELLULOSE CORDS, ROPES, THREADS, OR BIODEGRADABLE SYNTHETIC MATERIAL THAT IS WOVEN, KNOTTED OR MOLDED IN SUCH A MANNER THAT IT HOLDS MULCH IN PLACE UNTIL VEGETATION GROWTH IS SUFFICIENT TO STABILIZE THE SOIL. GENERALLY USED IN AREAS WHERE NO MOWING IS PLANNED. EXAMPLES OF NETTING ARE TOBACCO NETTING (USED WHERE FLOWS ARE NOT CONCENTRATED) AND JUTE NETTING (TYPICALLY USED IN DRAINAGEWAYS). SUBSTITUTE MEASURES:WHERE MULCH ANCHORING IS REQUIRED A TEMPORARY EROSION CONTROL BLANKET MAYBE USED. SITE PREPARATION:FOLLOW REQUIREMENTS OF PERMANENT SEEDING OR TEMPORARY SEEDING. APPLICATION TIMING: APPLIED IMMEDIATELY FOLLOWING SEEDING. SOME CELLULOSE FIBER MAY BE APPLIED WITH SEED TO ASSIST IN MARKING WHERE SEED HAS BEEN SPRAYED, BUT EXPECT TO APPLY A SECOND APPLICATION OF CELLULOSE FIBER TO MEET THE REQUIREMENTS OF MULCH FOR SEED. SPREADING: MULCH MATERIAL SHALL BE SPREAD UNIFORMLY BY HAND OR MACHINE RESULTING IN 80%-95% COVERAGE OF THE DISTURBED SOIL WHEN SEEDING WITHIN THE RECOMMENDED SEEDING DATES. APPLICATIONS THAT ARE UNEVEN CAN RESULT IN EXCESSIVE MULCH SMOTHERING THE GERMINATING SEEDS. FOR HAY OR STRAW ANTICIPATE AN APPLICATION RATE OF 2 TONS PER ACRE. FOR CELLULOSE FIBER FOLLOW MANUFACTURER'S RECOMMENDED APPLICATION RATES TO PROVIDE 80%-95% COVERAGE. WHEN SEEDING OUTSIDE THE RECOMMENDED SEEDING DATES, INCREASE MULCH APPLICATION RATE TO PROVIDE BETWEEN 95%-100% COVERAGE OF THE DISTURBED SOIL. FOR HAY OR STRAW ANTICIPATE AN APPLICATION RATE OF 2.5 TO 3 TONS PER ACRE. WHEN SPREADING HAY MULCH BY HAND, DIVIDE THE AREA TO BE MULCHED INTO APPROXIMATELY 1,000 SQUARE FEET AND PLACE 1.5-2 BALES OF HAY IN EACH SECTION TO FACILITATE UNIFORM DISTRIBUTION. FOR CELLULOSE FIBER MULCH, EXPECT SEVERAL SPRAY PASSES TO ATTAIN ADEQUATE COVERAGE, TO ELIMINATE SHADOWING, AND TO AVOID SLIPPAGE (SIMILAR TO SPRAYING WITH PAINT). MACHINE CLOGGING CAN OCCUR IF PRODUCT IS IMPROPERLY LOADED OR IF LEFTOVER PRODUCT IS LEFT IN MACHINE WITHOUT CLEANING. COMPLY WITH THE MANUFACTURER'S RECOMMENDATIONS FOR APPLICATION REQUIREMENTS AND MULCH MATERIAL SPECIFICATIONS. ANCHORING: WHEN NEEDED, MULCH ANCHORING IS APPLIED EITHER WITH THE MULCH AS WITH CELLULOSE FIBER OR APPLIED IMMEDIATELY FOLLOWING MULCH APPLICATION. EXPECT THE NEED FOR MULCH ANCHORING ALONG THE SHOULDERS OF ACTIVELY TRAVELED ROADS, HILL TOPS AND LONG OPEN SLOPES NOT PROTECTED BY WIND BREAKS. WHEN USING NETTING, THE MOST CRITICAL ASPECT IS TO ENSURE THAT THE NETTING MAINTAINS SUBSTANTIAL CONTACT WITH THE UNDERLYING MULCH AND THE MULCH, IN TURN, MAINTAINS CONTINUOUS CONTACT WITH THE SOIL SURFACE. WITHOUT SUCH CONTACT, THE MATERIAL IS USELESS AND EROSION OCCURS. INSTALL IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. MAINTENANCE INSPECT MULCHED AREAS AT LEAST ONCE A WEEK AND WITHIN 24 HOURS OF THE END OF A STORM WITH A RAINFALL AMOUNT OF 0.5 INCH OR GREATER UNTIL THE GRASS HAS GERMINATED TO DETERMINE MAINTENANCE NEEDS. WHERE MULCH HAS BEEN MOVED OR WHERE SOIL EROSION HAS OCCURRED, DETERMINE THE CAUSE OF THE FAILURE. IF IT WAS THE RESULT OF WIND, THEN REPAIR EROSION DAMAGE (IF ANY), RE-APPLY MULCH (AND SEED AS NEEDED) AND CONSIDER APPLYING A NETTING OR TACKIFIER. IF MULCH FAILURE WAS CAUSED BY CONCENTRATING WATER, INSTALL ADDITIONAL MEASURES TO CONTROL WATER AND SEDIMENT MOVEMENT, REPAIR EROSION DAMAGE, RE-APPLY MULCH AND CONSIDER APPLYING A NETTING OR TACKIFIER OR USE THE TEMPORARY EROSION CONTROL BLANKET MEASURE. ONCE GRASS HAS GERMINATED, INSPECTIONS SHOULD CONTINUE AS REQUIRED BY TEMPORARY SEEDING AND PERMANENT SEEDING. PROJECT NARRATIVE: THE PROPOSED PROJECT CONSISTS OF THE CONSTRUCTION OF A PEDESTRIAN WALKING PATH IN THE TOWN PARK. THE PURPOSE OF THE WALK IS TO CONNECT THE EXISTING BITUMINOUS WALK WITH A NEW WALK THAT WILL PROVIDE AN ACCESSIBLE ROUTE TO THE ROVERS SOCCER FIELDS. THE EXISTING WOODS TRAIL FROM THE PARKING LOT TO THE NORTHERNMOST FIELD WILL BE REBUILT IN IT'S CURRENT LOCATION. A SERIES OF STAIRS WILL BE ADDED TO THE PATH TO EASE THE ASSENT OF THE STEEP SLOPE. THE PROJECT AREA IS APPROXIMATELY 25,580 S.F OF THE EXISTING 116 ACRE PARK. THE 5-FT WIDE NEW BITUMINOUS WALK WILL BE APPROXIMATELY 1514 FEET LONG COVERING 7680 SF AND WILL MOSTLY BE LOCATED IN EXISTING GRASSED AREAS. PROPOSED GRADES WILL MOSTLY MATCH THE EXISTING GRADES. THE WALK WILL BE CONSTRUCTED OF BITUMINOUS CONCRETE AS IS INTENDED FOR PEDESTRIAN WALKING USE. THE PROPOSED WOODS TRAIL WILL FOLLOW THE EXISTING ROUTE. THE PATH WILL BE REBUILT AS A 6-FT WIDE STONE DUST PATH WITH STAIRS. THE THE PATH IS 630-FT LONG AND COVERS APPROXIMATELY 3790 S.F. THE SITE CONTAINS APPROXIMATELY 2,693,000 SF (61.8 AC.) OF WETLAND SOILS AND WATERCOURSES. THE WETLAND SOILS ARE OCCUM FINE SANDY LOAM AND SUNCOOK LOAMY FINE SAND WHICH ARE ALLUVIAL AND FLOOD PLAIN SOILS. THEY ARE PRESENTLY COVERED BY 89,358 SF (2.1 AC.) OF IMPERVIOUS SURFACE. APPROXIMATELY 1,600 LF (8000 SF) OF BITUMINOUS WALK WILL BE LOCATED IN WETLAND (FLOODPLAIN) SOILS. THE RECONSTRUCTED WOODS PATH WILL COVER APPROXIMATELY 2722 S.F. OF WETLANDS/REGULATED AREA. IN ADDITION, A TOTAL OF 15,000 SF OF WETLAND (FLOODPLAIN) AREA WILL BE DISTURBED. ALL EXCEPT 9960 SF. WILL BE TEMPORARY. THE BALANCE OF THE SITE CONTAINS HINCKLEY GRAVELY SANDY LOAM SOILS OR IS HINCKLEY URBAN LAND COMPLEX. OTHER THAN THE FLOOD PLAIN SOILS, THERE ARE NO SIGNIFICANT AREAS OF WETLAND SOILS. EXCEPT FOR THE AREA ADJACENT TO THE WEST BRANCH OF SALMON BROOK WHICH IS LOCATED ALONG THE WESTERLY BORDER OF THE PROJECT. THERE ARE NO ACTIVITIES PROPOSED WITHIN THE BROOK AND EXISTING DRAINAGE PATTERNS WILL BE MAINTAINED. TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES WILL BE IMPLEMENTED DURING CONSTRUCTION. THE ANTICIPATED CONSTRUCTION WILL BEGIN IN THE SPRING OF 2027 AND END IN THE FALL OF 2027. THE RESPONSIBLE PARTY IS: SANDRA YOST DIRECTOR OF COMMUNITY SERVICES TOWN OF GRANBY 860-844-5351 MITIGATION ACTIVITIES NARRATIVE: IMPACTS ASSOCIATED WITH THE CONSTRUCTION AND MAINTENANCE OF THE PROPOSED SIDEWALK AND SITTING AREAS ARE MINIMAL, LIMITED TO THE ADDITION OF IMPERVIOUS AREA WITHIN AN ALLUVIAL WETLAND AND THE URA OF THE SALMON BROOK. THE AREA WHERE THE SIDEWALK WILL BE INSTALLED IS CURRENTLY MAINTAINED LAWN FOR RECREATION, AND AS PART OF THE PROJECT THE LAWN AREA WILL BE RESTORED TO NATIVE VEGETATION AS DESIGNATED BY THE FOLLOWING MITIGATION PLAN BELOW AND AS DEPICTED ON THE “PLAN TOWN OF GRANBY SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING, 215 SALMON BROOK STREET, GRANBY, CT”, DATED 9.3.26, COVER SHEET, C1-C4 AND DE1-DE3, AS AMENDED. POTENTIAL IMPACTS DURING CONSTRUCTION ARE LIMITED TO SEDIMENT MIGRATION FROM THE CONSTRUCTION AREA INTO A REGULATED AREA. AS SEEN DURING THE FIRST PHASE OF THE SIDEWALK, SOIL DISTURBANCE ASSOCIATED WITH THIS PROJECT IS MINIMAL AND TEMPORARY. BARRIER EROSION CONTROLS WILL BE TEMPORARILY PLACED AS NECESSARY TO PREVENT SEDIMENT MIGRATION DURING PRECIPITATION EVENTS, AND THE AREA WILL BE SEEDED AND MULCHED AS SOON AS POSSIBLE. A QUICK GERMINATING SEED MIX WILL PROVIDE FOR BOTH RAPID AND LONG-TERM VEGETATIVE STABILIZATION. THIS PROJECT COULD POTENTIALLY FIT THE REQUIREMENTS OF A NONREGULATED USE, DUE TO THE GOAL OF PROVIDING EQUITABLE OUTDOOR RECREATION OPPORTUNITIES, HOWEVER, IT REQUIRES A GOOD AMOUNT OF DISTURBANCE AND THEREFORE A PERMIT IS REQUESTED. THE TOWN PROPOSES TO INCORPORATE VEGETATION MANAGEMENT AND PLANTING EFFORTS AT KEY AREAS ALONG THE PROJECT ROUTE. THESE AREAS WERE SELECTED WHERE AREAS COULD USE DEEPLY ROOTED VEGETATION FOR LONG-TERM SOIL STABILIZATION MEASURES ADJACENT TO THE SALMON BROOK. PLANTINGS IN THE CHOSEN LOCATIONS WILL PROVIDE ADDITIONAL VEGETATIVE BUFFERS ALONG SALMON BROOK, AIDING IN LONG-TERM BANK STABILITY AND PARK/PROJECT PROTECTION. MITIGATION EFFORTS SHALL BE SUPERVISED DAILY DURING VEGETATION REMOVAL AND PLANTING OPERATIONS BY THE GRANBY WETLANDS AGENT OR THE IWWC DESIGNEE. THESE EFFORTS SHALL INCLUDE INVASIVE SPECIES REMOVAL, SOIL STABILIZATION PLANTINGS, AND SIGNAGE AT A SALMON BROOK ACCESS TRAIL. THE FOLLOWING DESCRIBES THE MITIGATION ACTIVITIES IN DETAIL FOR THE PROJECT, INCLUDING HOW EACH MITIGATION AREA SHALL BE TREATED. SITEWIDE: ALONG THE PROJECT ROUTE, ALL VINES THAT ARE CHOKING TREES SHALL BE CUT AT THEIR BASE AND AN HERBICIDE APPLIED TO THE FRESH CUT STUMP. A CONE SPRAYER OR PAINT ON METHOD MAY BE UTILIZED AND APPLIED IN ACCORDANCE WITH ALL APPLICABLE LAWS. THE EXTENT OF ORIENTAL BITTERSWEET (CELASTRUS ORBICULATUS) IN SOME LOCATIONS IS EXTENSIVE, AND COMPLETE ERADICATION IS HIGHLY UNLIKELY DUE TO THE RIVERINE LOCATION PROVIDING A CONSTANT SEED SOURCE FOR POTENTIAL SPECIES RE-ESTABLISHMENT. THEREFORE, A MORE REALISTIC GOAL IS TO PRESERVE MATURE TREES THAT ARE BEING “STRANGLED” BY VINES. VINES DO NOT NEED TO BE REMOVED FROM THE TREE OR THE SITE BUT ALLOWED TO DEGRADE IN PLACE. AS DIRECTED BY THE SUPERVISING IWWC DESIGNEE, TARGET INVASIVE SPECIES SHALL BE REMOVED AND PROPERLY DISPOSED. THE TARGET SPECIES INCLUDES BUT IS NOT LIMITED TO LARGE AUTUMN OLIVE (ELAEAGNUM UMBELLATA) AND MULTIFLORA ROSE (ROSA MULTIFLORA) SPECIES. AREA 1: THIS AREA IS ADJACENT TO A BEND IN THE SALMON BROOK AND IS CURRENTLY MAINTAINED LAWN. TO AID IN PRESERVING THE UPLAND AREA ADJACENT TO THE BANKS, 3 TREES AND 10 SHRUBS ARE RECOMMENDED TO BE INSTALLED IN THIS AREA. INCLUDED IN THIS AREA ARE 3 PERENNIAL ISLANDS, EACH PERENNIAL ISLAND SHALL INCLUDE 6 HERBACEOUS PLANTINGS.DORMANT BROADCASTING OF A NATIVE SEED MIX SHALL BE COMPLETED BEFORE THE FIRST FROST OF THE FIRST YEAR OF THE PROJECT AS SPECIFIED BY THE IWWC OR THEIR DESIGNEE. MOWING SHALL OCCUR IN SPRING AND LATE FALL ONLY TO ALLOW FOR THE SEED STOCK TO FORM SUBSTANTIAL ROOTS. IT IS RECOMMENDED THAT THE AREA CONTINUE TO BE MOWED BETWEEN THE TREE AND SHRUBS FOR 2 YEARS, OR LONGER IF APPROVED, TO PREVENT INVASIVE SPECIES OVERGROWTH. ONCE STRONG ESTABLISHMENT OF PLANTINGS, THE AREA MAY NO LONGER BE MOWED. ALL PLANTINGS SHALL BE CLEARLY STAKED. AREA 2: THIS AREA IS VEGETATED BUT DOES NOT CONTAIN ANY CANOPY TREES. IT IS PROPOSED TO INSTALL 1 TREE IN THIS LOCATION THAT IS GREATER THAN 6 FEET TALL. AN AREA AROUND THE TREE INSTALLATION AREA SHALL BE CLEARED OF INVASIVE SPECIES. MOWING AROUND INSTALLED TREES SHALL OCCUR FOR 2 FULL GROWING SEASONS. AREA 3: THIS AREA IS VEGETATED BUT DOES NOT CONTAIN ANY CANOPY TREES. IT IS PROPOSED TO INSTALL 2 TREES AND 6 SHRUBS IN THIS LOCATION THAT IS GREATER THAN 6 FEET TALL. AN AREA AROUND THE TREE INSTALLATION AREA SHALL BE CLEARED OF INVASIVE SPECIES. MOWING AROUND INSTALLED TREES SHALL OCCUR FOR 2 FULL GROWING SEASONS. AREA 4: THIS AREA IS VEGETATED BUT DOES NOT CONTAIN ANY CANOPY TREES. IT IS PROPOSED TO INSTALL 1 TREE IN THIS LOCATION THAT IS GREATER THAN 6 FEET TALL. AN AREA AROUND THE TREE INSTALLATION AREA SHALL BE CLEARED OF INVASIVE SPECIES. MOWING AROUND INSTALLED TREES SHALL OCCUR FOR 2 FULL GROWING SEASONS. AREA 5: ALONG THE TREE LINE, A LINE OF HERBACEOUS PERENNIALS ARE PROPOSED TO BE INSTALLED. THIS WILL INCREASE THE ROOT PROFILE AND REDUCE MOWING IN THIS CRITICAL LOCATION. AREA 6: THIS AREA IS VEGETATED BUT DOES NOT CONTAIN ANY CANOPY TREES. IT IS PROPOSED TO INSTALL 2 TREES AND 6 SHRUBS IN THIS LOCATION THAT IS GREATER THAN 6 FEET TALL. AN AREA AROUND THE TREE INSTALLATION AREA SHALL BE CLEARED OF INVASIVE SPECIES. MOWING AROUND INSTALLED TREES SHALL OCCUR FOR 2 FULL GROWING SEASONS. VEGETATION PLANTING SPECIES SELECTION: TREES: RED MAPLE (ACER RUBRUM), SHAGBARK HICKORY (CARYA OVATA), AMERICAN ELM (ULMUS AMERICANA), COTTONWOOD (POPULUS DELTOIDES), GREEN ASH (FRAXINUS PENNSYLVANICA), WILLOW SP. (SALIX SP), BLACK BIRCH (BETULA LENTA) AND AMERICAN SYCAMORE (PLATANUS OCCIDENTALIS). SHRUBS: STAGHORN SUMAC (RHUS TYPHINA), SWEET PEPPERBUSH (CLETHRA ALNIFOLIA), AND ELDERBERRY (SAMBUCUS ANADENSIS) HERBACEOUS PERENNIALS: COMMON MILKWEED (ASCLEPIAS SYRIACA), BLACK-EYED SUSAN (RUDBECKIA HIRTA), BROWN-EYED SUSAN (RUDBECKIA TRILOBA) DORMANT SEED MIX: OX-EYE SUNFLOWER (HELIOPSIS HELIANTHOIDES), FALSE INDIGO (BAPTISIA SP.) , PARTRIDGE PEA (CHAMAECRISTA FASCICULATA), PURPLE CONEFLOWER (ECHINACEA PURPUREA), RUBECKIA SP, AND SEDGES AND GRASSES AS MIXED OR SPECIFIED NO.DATEDESCRIPTION REVISIONS 10/06/26 PER WETLANDS AGENT COMMENTSGRANBY TOWN HALL 15 NORTH GRANBY ROAD GRANBY, CONNECTICUT 06035 PHONE: (860) 844-5318 FAX: (860) 844-5325 TOWN OF GRANBY ENGINEERING DEPARTMENT SCALE:DATE:JOB #:SHEET: 1"=20'SEPTEMBER 3, 2026 2025.G01DE-3 DETAILS & NOTES TOWN OF GRANBY SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING 215 SALMON BROOK STREET GRANBY, CONNECTICUT
Page 90
Page 91
Page 92
WETLAND AND SOIL SCIENCES & ENVIRONMENTAL CONSULTING P.O. Box 233 | Granville, MA 01034 413.695.2195 freshwaterwetland@gmail.com October 8, 2026 Re: Memo – 7 Laurel Drive – Inland Wetlands Agent Review, Kate Bednaz The following is my review of the application materials submitted as part of the current application for 7 Laurel Drive. As part of this review, I have reached out to IWWC members to understand their perspective on the proposed activities as it relates to the resolution of yours and the past owners active Enforcement Orders (EO). The overall consensus of application reviewers is that the current layout and request as it relates to the wetland/drainage swale and shed area be re-evaluated due to the level of impact proposed to the wetland. In general, wetland disturbance is permitted if wetland area or other beneficial area is created on a 1:1, if not a 2:1 ratio. It is understood per Mr. Stansfield that “… It has been and remains my opinion that if any impairment of the wetlands on the subject property been done, it was prior to my initial inspection. Due to the apparent historic grading and filling that likely occurred as part of the original residential development of the parcel, including water and sewage infrastructure, very few of the typical wetland functions we commonly associate with pristine wetland areas are evident and it is unlikely, due to manipulation of the fragile wetland soils that may have existed prior to development, that a manufactured mitigation scenario would be successful. I would recommend that the disturbed areas be vegetated and the on-site water be accommodated to minimize water damage to the structures.” I agree with this statement, however, impacts did become enhanced post the initial enforcement actions. It is my opinion that at this point it is our goal is to balance the functions and values provided by the wetland area, while providing a usable lot considering historical development choices. Providing/maintaining the essential function of this area which is area that provides hydrologic stability and control of flooding and erosion; to the recharging and purification of groundwater; and to the existence of many forms of animal, aquatic and plant life. The following are additional review comments. a. No concerns were raised regarding maintaining the installation of the permitter fence if it is not located within stormwater flow pathways and provides for amphibian migration through large holes in the fencing. b. No concerns were strongly raised regarding the removal of the pine trees. However, concerns were raised regarding the removal of non-invasive woody species behind the existing shed, as woody vegetation offers roughness to reduce erosion, slow flow, and uptake nutrients. This concern extends to the portion of the woody tree line that is located along the northerly property boundary, adjacent to the canal and the wetland. It is recommended that the area adjacent to the canal, that will receive stormwater at an elevation that provides for potential for stormwater infiltration and be vegetated with woody and herbaceous species. c. No concerns were raised regarding the elimination of the portion of the wetland adjacent to the existing house or the gravel parking area. However, the extent of piping proposed to behind the current shed locations eliminates the majority of potential for the hydrological benefits intended to be preserved on this property.
Page 93
WETLAND AND SOIL SCIENCES & ENVIRONMENTAL CONSULTING P.O. Box 233 | Granville, MA 01034 413.695.2195 freshwaterwetland@gmail.com a. To maintain wetland conditions and provide for the intended functions and values it is recommended that less of the wetland be piped. The pipe should be pulled back towards the house provide enough volume to maintain wetland soils and provide for a vegetated infiltration area. This will likely necessitate moving the shed to provide for greater area to maintain the functions and values of the wetland area to the maximum extent practicable. Please note that some members thought that the entire wetland needed to be restored to the maximum extent practicable. It is the consensus, the request to lose wetlands adjacent to the home, or farther, requires that an area be preserved to maintain the functions and values as referenced above. This natural, unmaintained area can be landscaped with native species that are pleasing to the eye and functional to our ecosystems. The IWWC members and myself that a balance can be achieved to maintain if not improve wetland conditions while maintaining the mentioned property line privacy screening.
Page 94
TOWN OF GRANBY
Office of Community Development, Inland Wetlands and Watercourses Commission
Telephone: (860) 844-5318, www.granby-ct.gov
A
pplication for Inland Wetlands & Watercourses Activity
Application For: Permit Extension Modification (Existing Permit/Application #): __________________________
Wetlands Map Amend. Request for Review Other:
Property Location and Nearest Intersection:
Size of Parcel:_________ Zone: ________ Map/Lot: ____________ Current Use: ___________________________
Applicant’s Name:
Complete Address:
Daytime Phone: Evening Phone: Fax:
Email:
Owner’s Name:
If the owner is a corporation, or other non-individual entity, include the primary contact information
Complete Address:
Phone Daytime Phone: Evening Phone: Fax:
Applicant’s Representative:
Complete Address:
Daytime Phone: Evening Phone: Fax:
Wetlands Located on Property (in square feet (sq. ft.)): Wetlands to be impacted (sq. ft.):
Watercourses Located on Property? Name or Type of Watercourse:
Are Proposed Activities Located within the 100-Year Floodplain? Floodway?
Are there slopes with grades in excess of 15% located on the property?
Do Proposed Activities Require Review by the PZC?
*********SEE APPLICATION CHECKLIST ON BACK for MINIMUM APPLICATION REQUIREMENTS**********
The applicant understands that this application is to be considered complete only when all information and documents required by
the Commission have been submitted. The undersigned warrants the truth of all statements contained herein and in all supporting
documents according to the best of his/her knowledge and belief. Permission is granted to the Town of Granby, Inland Wetlands &
Watercourses Commission, and its agent (s) to inspect the subject land, at reasonable times, during the pendency of an application
and for the life of the permit.
Applicant’s Signature: Date:
Owner’s Signature: Date:
FOR OFFICE USE
Application #: Date Submitted:
Fee amt./Check or Cash: Date of Receipt:
Agent Ruling: Date Approved/Denied:
See Reverse Side for Conditions of Approval or Reason for Denial
X
East/northeast of Salmon Brook St (Rt. 10) & Floydville Rd intersection
215.36 ac I 53/78/28 Nursery
Broadleaf Solar, LLC
575 Fifth Ave., 24th Fl., New York, NY 10017
(212) 478-0000
jon.gravel@desri.com
Broadleaf Solar, LLC
575 Fifth Ave., 24th Fl., New York, NY 10017
(212) 478-0000
Jonathan Gravel
575 Fifth Ave., 24th Fl., New York, NY 10017
207-239-8782 207-239-8782
*******************************PLEASE ATTACH ADDITIONAL SHEET IF NECESSARY************************************** Project Name
and Brief Description (i.e. residential, agricultural, commercial, number of lots, etc.): Following the seeding stabilization
and agronomic E&S work previously presented to the IWWC, Broadleaf reviewed the areas where sediment has historically/recently left the
site. No new sediment has left the site since installation of erosion and sedimentation measures (sediment traps, barriers, blankets) and an
evaluation of sediment near/within wetlands was conducted. Refer to enclosed documentation on the finding and recommendation.
Is any portion of the property located within 500 feet of an adjoining municipality? Yes
1 Mil +/-
Yes Unnamed tributaries to Salmon Brook
No No
Yes, but not subject to proposed work
NoPage 95
Northern Sand Deposit
Page 96
Photo 1 - View Looking North from edge of field – note extensive waddles and no new sediment from installation Photo 2 – View looking South from wetland boundary (upland 7–8 inch deposit)
Page 97
Photo 3 – View looking southerly at 6–7-inch deposit at with within wetland boundary Photo 4 – View looking NWN along broadest potion of sand deposit from upland
Page 98
Photo 5 – leading edge 1-2 inches of sediment down gradient of waddle 2-4 up to small tree in foreground and top of the image.
Page 99
Sumatra Pond -Spillway – Sand Deposit
Page 100
Photos 1 – Looking at Spillway from Road upland area. Note: multiple barriers in place, no new sedimentation beyond silt fence, spillway was bulldozed by previous owner/operator from this location and into the tree line Photo 2 – Upland deposit 8 – 9 inches typical, but ranges in depth throughout upland area.
Page 101
Photo 3 – Wetland deposit 6-8 inches less deposition along the edges Photo 4 – Wetland deposit 4-6 inches (conservative average) but varies by location 1-6 inches.
Page 102
Photo 5 -Wetland deposit 3-4 inches at leading edge of sediment. Photo 6 – Upland scour downgradient of leading edge (Photo 5 above) Note: This is a pre-existing condition do to previous bulldozing spillway and no deposition observed.
Page 103
Floydville Road Upland Deposit Action: No New Action Planned – Area stable
Page 104
Photo 1 – Facing south towards Floydville Road at receiving end of culvert view looking at upland Swale vegetated – waddles were placed in June/July ahead of seeding effort. Photo 2 – Existing Culvert – set high large plunge pool below. No flow but moist at bottom of pipe.
Page 105
Photo 3 – View looking northern along in sized stream experience heavy flash flow during nursery operation (storm events X irrigation). Pre-existing condition no deposition of sand within stream course. No flow in stream
Page 106
Unnamed Tributary to Salmon Brook - Via Sumatra Pond Photo 1 – Looking downstream at sand bars likely influenced by historical sand sedimentation from previous nursery activities. In the foreground is a broader riparian and confluence of Salmon Brook. Photo 2 – Looking Downstream along stream channel. Minimal historical deposition present.
Page 107
Photo 3 – Looking a point bank where sand deposit settled overtime.
Page 108
Mitigation and Recommendation Next Steps, and Fall Plan Based on the field review and mapping, the following approach is recommended to address the identified sediment deposits while minimizing additional wetland and stream disturbance. 1. Wetland Sediment Removal • Remove the mapped wetland deposits at the Northern Sand Deposit and Sumatra Pond Spillway areas using low-impact methods, preferably by hand when within 2” of natural grade and place spoil material in the stable vegetated upland areas away from potential water conveyances. Seed any upland areas disturbed by the work and allow mitigated areas to revegetate natural from seed bank. • Maintain the existing erosion and sedimentation controls during removal and continue rainfall- based inspections. • Begin work while conditions remain dry and stable, but pause once winter or saturated/frozen ground conditions would result in additional rutting, compaction, or wetland disturbance. Complete remaining work under suitable spring conditions. 2. Stable Upland Areas • Stable upland deposits shown on the mapping should remain in place and continue to be stabilized/revegetated. No additional excavation is recommended in these areas. 3. Unamend Tributary to Salmon Brook / Watercourse Recommendation • Historical sand deposition is present in portions of the stream and adjacent riparian areas near the Sumatra Dam, including localized sand bars. The deposits have naturalized within the existing stream/riparian setting. • No sediment removal is recommended within the stream at this time. The flow is not impeded, and removal could alter the existing flow path and create new erosion or cut banks into finer streambank material. • Leave the stream undisturbed and continue to observe it during routine inspections, particularly after significant rainfall if sediment is departing the site. Reassess only if sediment accumulation, impeded flow, or channel instability is observed. 4. Overall Recommendation • Proceed with targeted wetland sediment removal while conditions permit low-impact access; leave stable upland deposits in place; and leave stream sediment undisturbed unless a future field review identifies a clear functional or erosion concern. 5. Fall 2026 Plan • Broadleaf is planning to a second seeding effort for fall. This work will include but not limited to, mowing existing cover crop, plowing in clippings, and reseeding the ground with another crop of rye or a similar annual species. • Continue monitoring based on rain events and take proactive measures by adding additional E&S measures (sediment traps and barriers) where appropriate to avoid potential soil transport and allow ground water infiltration.
Page 109
Page 110
Page 111
Page 112
Page 113
Page 114
Page 115
K.A. / 2026-08-10 Page 1
MEMORANDUM
TO: Kathryn Malinowski
Environmental Analyst II
Water Planning and Management Division
Connecticut Department of Energy & Environmental Protection
FROM: Karl Acimovic, P.E.
DATE: August 10, 2026
SUBJECT: Case Street Dam
186 Case Street
West Granby, Connecticut
NOV No. DS-2025-1061V
The Case Street Dam, situated on the east side of Case Street in West Granby,
was constructed for farming purposes. The current owner, Matthew Reale of
Scottinaleece, LLC, has conferred with USDA in preparing an infrastructure and grazing
plan for cattle on the subject property, though not in conjunction with the Dam Safety
permitting process. It is the intent, through this correspondence, to initiate work on the
preparation of an individual dam safety permit.
The dam and pond are located approximately 1,600 ft. east of Case Street along
a wood road passing through open fields and wooded areas. A topographic survey of
the site, along with the delineation of perimeter wetlands, has been completed and
added to the plan. The drainage area for this site encompasses a wooded and rolling
landscape approximately 0.11 sq. mi. in size. Based on photographs taken during
construction, the dam was built with an impervious core within a cutoff trench, a
reinforced concrete drop inlet structure and a low level outlet pipe from the structure to a
downstream outlet point. The outlet pipe, a 42-inch HDPE with a corrugated exterior
and smooth interior, is protected by an anti-seep collar situated approximately half-way
between the upstream inlet and downstream discharge point.
The pond is intended to provide water for irrigation and consumption by onsite
cattle livestock. It is part of the plan prepared by USDA to manage an area that may be Page 116
K.A. / 2026-08-10 Page 2 broken up into individual paddocks where access to water will be required through water lines from the pond. Based on watershed, proposed dam and pond size, and downstream conditions, we recommend a hazard rating of “A” for this dam site. Attached are the following: (1) Location Map (2) Watershed Map (3) USDA Future Infrastructure Plan (4) USDA Rotational Grazing Plan Engineering work in progress includes further hydrologic and hydraulic assessments, validation of existing construction materials, design improvements and preparation of engineering plans and permit application. Based on your recommendation, we would also like to participate in a pre-application process to determine final requirements for permitting.
Page 117
LOCATION MAP CASE STREET DAM WEST GRANBY, CONNECTICUT SCALE: 1" = 2,000' BASE MAP: USGS 2026-08-10 CASE STREET DAM BARKHAMSTED ROUTE 219 ROUTE 179 CASE STREET GRANBY
Page 118
WATERSHED MAP CASE STREET DAM WEST GRANBY, CONNECTICUT SCALE: 1" = 600' BASE MAP: USGS 2026-08-10 WATERSHED 0.11 SQ. MI. CASE STREET DAM UNNAMED STREAM CASE STREET FIELDING WOODS ROAD
Page 119
1000 ft N ➤➤ N Image © 2025 Airbus Image © 2025 Airbus Image © 2025 Airbus
Page 120
Connecticut Rotational
Grazing Plan
CERTIFICATION OF PARTICIPANTS
Telephone:
Email Address:
Matt Reale
Coal Black Angus
Cover Sheet
This Grazing Plan Has Been Developed For:
2- Grazing Manager:
1- Farm Name:
July 2, 20264- Date:
Farm Contact Address: 97 Daniel Trace Rd. Burlington, CT 06013
Nikki Bak
Prepared By:
Telephone Number:
3- Planner Name:
nikki.bak@usda.gov
________________________ __________
Matt Reale Coal Black Angus DATE
Page 121
Grazing Forage Balance and
Paddock Number Estimator Worksheet
Farm Name: Coal Black Angus
Prepared By: Nikki Bak
Date: July 2, 2026
5- Enter the type of grazing livestock: Beef (Feeder)
Notes:
6- Enter the Number of grazing livestock: 45
Notes:
7- Enter total acres available and planned 60.0 Acres
for grazing: Notes:
Dietary Data:
8- Enter average body weight of grazing livestock: 1,200 Pounds
(Table 1) Notes: avg weight = 1500 for adults 900 for calves = 1200lbs
9- Enter estimated Dry Matter Intake (DMI) 2.5% DMI
as a % of body weight): (Table 2) Notes: used % for stocker and heifer cattle to get an average
10-Calculate Daily DMI for a single animal: 30.0 Estimated Pounds of Dry Matter Intake Per Animal
( 8 ) X ( 9 ) Notes:
11-Calculate Daily DMI for the herd:
( 6 ) X ( 10 ) 1350.0 Total Est. Pounds of Dry Matter Required / Day For The Herd
Notes:
Grazing Data:
12-Enter length of desired grazing period in days: 7.0 Days
(Table 3) Notes:
13-Enter estimated available forage dry matter in 1,200 Pounds per acre per day
pounds per acre : (Table 4) Notes: go in at 8" and remove at 3" on avg density
14-Calculate estimated paddock size: 7.9 Acres
[( 11 ) / ( 13 )] X ( 12 ) 343,035
Square Feet
15a-Enter Estimated paddock recovery period 42 Days
days: (Table 5)
15b-Calculate estimated number of paddocks 7 Estimated number of paddocks needed
needed: [( 15a ) / ( 12 )] + 1 Notes:
16-Calculate total acres needed for grazing: 55.1 Total estimated acres needed for the grazing plan.
( 14 ) / ( 15b ) Notes:
Paddock Acres = 7.9
Month Estimated Rest Days Estimated # of Paddocks Needed
April 15 3
Estimated # of Acres Needed
24.8
Month Estimated Rest Days Estimated # of Paddocks Needed
May 18 4
Estimates of Acres and Number of Paddocks Needed By Month
Note: 42 days rest period is the default for
September.
2 of 7Page 122
Grazing Forage Balance and
Paddock Number Estimator Worksheet
Estimated # of Acres Needed
28.1
Month Estimated Rest Days Estimated # of Paddocks Needed
June 24 4
Estimated # of Acres Needed
34.9
Month Estimated Rest Days Estimated # of Paddocks Needed
July 30 5
Estimated # of Acres Needed
41.6
Month Estimated Rest Days Estimated # of Paddocks Needed
August 36 6
Estimated # of Acres Needed
48.4
Month Estimated Rest Days Estimated # of Paddocks Needed
September 42 7
Estimated # of Acres Needed
55.1
References: "Introduction To Management Intensive Grazing" By: Bill Murphy
"Greener Pastures on Your Side of the Fence" By: Bill Murphy
"Pasture Management" By: Sarah Flack
"Pasture Condition Score Sheet" By: Jim Cropper
3 of 7Page 123
For: Farm Name: Coal Black Angus Grazing Manager: Matt Reale Contact Address: 97 Daniel Trace Rd. Burlington, CT 06013 Planning Assistance Provided By: Nikki Bak FARM GRAZING GOALS: The goal of the farm operation is to increase grass forage production and yield, forage quality and diversity and provide for grass-forage feeding with minimal effort and cost. This prescribed grazing plan will protect the soil and water and the farm’s natural resources, improve forage production and herd health. LIVESTOCK GROUP 1 Number of Grazing Livestock: 45 Type of Grazing Livestock: Beef (Feeder) Grazing Livestock Average Weight: 1200 Pasture Acres Available Group 1: 60.0 Grazing Acres Needed (Group 1): 55.1 LIVESTOCK GROUP 2 Number of Grazing Livestock: Type of Grazing Livestock: Grazing Livestock Average Weight: Pasture Acres Available Group 2: Grazing Acres Needed (Group 2): 55.1 Acres Needed INVENTORY DATA FARM INFRASTRUCTURE: Currently there is no infrastructure on the property. A 3 acre pond on site will to be used as a water source for cattle. The farm has plans to build a run-in shed on the western side of the property and build barns on the eastern side. Power will be brought to the site to the future barn. Access roads are essential to stablize the ground to bring livestock and equipment back and forth from the far pastures to the planned buildings. Fencing is needed along the access roadways to keep livestock along the roads during movement. PADDOCK INVENTORY: The primary limitations of the soils in this grazing system include concerns with stoniness, areas of high runoff without adequate vegetative cover, and areas of bedrock with potential summer moisture deficiency. FORAGE INVENTORY DATA: Land is currently being converted from a forest setting to pasture. After taking soil samples and applying the recommended soil amendments, seed new pastures with a forage mix. Total Acres Needed For The Grazing Plan: GRAZING PLAN Page 4 of 7
Page 124
For: GRAZING PLAN LIVESTOCK EXCLUSION REQUIREMENTS: Livestock will not have access to flowing surface waters or standing water in wetlands or low areas anytime water is present unless it is by controlled access according to NRCS conservation practices. For low areas this is usually only during the early spring (March, April and May). This will help maintain these fields as productive pasture and prevent potential polluted runoff from reaching surface waters (streams) or groundwater. The livestock will only be allowed to access these fields when all surface water has drained away. This will improve water quality and improve animal health. MANURE AND NUTRIENT MANAGEMENT: Management of the manure and nutrients will be done primarily by the rotation of cattle and with proper placement of water tubs and supplied minerals. Soil test(s) will be taken to determine the economic threshold of applying fertilizer to increase production. The pH levels may also indicate lime is needed to neutralize the soil. Soil tests should be taken every three years. Apply nitrogen when needed to increase production for fall pasture. Implementation of the rotational grazing system will spread manure throughout the pasture. Sacrifice or winter paddocks will be seeded to a cover crop for summer pasture and to take up excess nutrients or will be excluded from grazing until the forage has completely recovered. EXISTING OR PLANNED WATER SYSTEM: The watering system will include new pond as the water source, with pump, pipeline, and movable water tubs with floats. Emergency Watering: In the case of an emergency, such as power failure, pump failure, etc. the livestock will be provided water by: a) providing open access to surface waters, however, access will immediately cease as soon as the emergency is over. b) hauling water from existing water sources to grazing animals. EXISTING OR PLANNED FENCES: Exterior Fencing: The proposed exterior fence will be maintained to prevent grazing livestock from getting out of the pasture and into the road,neighboring property, or into water sources. Interior fences can be used to break up pastures into smaller paddocks to allow for rotational grazing. ADDITIONAL PLAN INFORMATION Page 5 of 7
Page 125
For: GRAZING PLAN DROUGHT CONTINGENCY PLAN: The “summer slump” for cool season grasses and legumes (very slow or no growth) occurs as summer air temperatures increase with simultaneous decreases in rainfall. During this period, the manager will need to supplement with forages (hay) at this time and should follow a plan to meet the requirements of the livestock while still protecting the plants until this summer slump ends. The following Drought Contingency Plan will be used: During periods of drought when forage production is significantly reduced, the livestock manager will: • reduce herd size or increase paddock size, OR • rotate the livestock through the grazing system at a “slower” than normal pace, OR • put the livestock in a “sacrifice” paddock to take the abuse while other paddocks rest and avoid forage damage, OR • feed a supplemental forage supply such as hay in a sacrifice paddock until the drought ends. A long drought may require all of the above to be implemented. MUD CONTINGENCY PLAN: When grazing conditions are very wet the following Mud Contingency Plan will be used. • Rotate the livestock through the grazing system at a “faster” than normal pace, or • put the livestock in a “sacrifice” paddock of favorable soil type to take the brunt of the abuse to allow other paddocks a chance to avoid damage, or • change the paddock order in the rotation schedule to avoid muddy situations There may be situations where all three of the above will be implemented during a long wet period. WINTER PLANS: After the grazing season is complete and winter weather moves into the area, the livestock will be managed in the following manner: a) Livestock will be rotated among winter pasture/paddock areas near the headquarters. Feed will be brought to the livestock at these locations. A freeze-proof water source should be provided. The winter sacrifice paddocks will be chosen due to low runoff potential, level topography and well-drained soils. The paddocks will be soil tested every year after livestock move out to the other paddocks in the spring. b) Livestock will be confined and the manager will store the manure from (November 1 to April 1, e.g.) in an approved stacking area. Page 6 of 7
Page 126
For:
GRAZING PLAN
EXCESS PASTURE PLANS: The fields will be hayed, or at least clipped, if the forage is growing at rates
that exceed grazing rotation of the livestock. By haying the excess forage
off of the fields during peak times, the forage production of the whole
system will be maintained. If pasture is not accessible by tractor, priority
should be given to graze those areas first. The grazing system should be
created with priority given to graze inaccesible pastures. Thus, if pastures
are getting ahead of the grazing system, accessible fields can be easily
clipped and/or hayed, and forage waste is minimized.
GRAZING SCHEDULE:
Livestock Group 1
GRAZING DAYS / PADDOCK: 7
REST PERIOD / PADDOCK: 42
PLANNED PADDOCK SIZE AC: 7.9
PLANNED # OF PADDOCKS 7
Livestock Group 2
GRAZING DAYS / PADDOCK:
REST PERIOD / PADDOCK:
PLANNED PADDOCK SIZE AC:
PLANNED # OF PADDOCKS:
MONITORING AND RECORD
KEEPING PLANS:
The key forages will be measured by weekly observation, by weekly grazing
stick checks, or by other means to note changes in plant composition, plant
diversity, yield, and plant density. Records of weekly observations will be
documented and retained, as well as records of livestock movement
through the grazing system.
PLANNED PRACTICE
INFORMATION:
Optimum Average Height to Graze Forage Species present: 8 inches
Maximum Average Height to Graze (taller than this make hay): 12 inches
Minimum Average Grazing Height (do not graze lower than): 3 inches
Note: Grazing should begin in a different paddock at the beginning of each grazing season.
Page 7 of 7Page 127
Page 128
Page 129
Minutes: archived copy, SHA-256 1a75bdf8608c…. Agenda: archived copy, SHA-256 53ba21c1420d…. Packet: kept offline, SHA-256 13e3c0a7a959….