CT Public Docs Tracker

Towns / Granby / Inland Wetlands & Watercourses Commission / Oct 14, 2026

Inland Wetlands & Watercourses Commission, Oct 14, 2026

Granby minutes posted

Documents

TypeDocumentPagesOpen
minutes IWWC Minutes 5 PDF download · town site
agenda IWWC Agenda 1 PDF download · town site
packet IWWC Meeting Packet
Not attached: this packet is 30 MB, too large to host here. Use the town site link.
129 town site

Summary of the minutes

AI-generated summary. Each line links to the PDF page it came from; check it before relying on it.

Read the official minutes (PDF, 5 pages) The PDF is the record; this summary is a guide to it.

The Commission approved the September 9, 2026 minutes as amended, closed the public hearing on 37 Hartford Avenue and continued it to the next regular meeting, and approved several requests for review and permit applications, including 199 Barn Door Hills Road and 45 Barkhamsted Road as as-of-right determinations. The 7 Laurel Drive permit was approved 4-1-0 and the 53 West Granby Road walking path permit was approved 6-0-0, while the 12 Northwoods Road request, the 90 Salmon Brook Street item, and the 142R/186 Case Street update were continued.

Decisions (10) · all reported votes

  1. Approval of September 9, 2026 Meeting Minutes
    Approved as amended (change 'shall connect' to 'should connect' on page 2; convert 'K. Bednaz…' sentence into item #7c)
    Vote: Motion by S. Okie, second by B. Schmitt, voted 6-0-0 · p. 1
  2. 37 Hartford Avenue – F. Devine – Permit application for regulated activities (16-unit apartment building)
    Public hearing closed at 7:46 p.m. and application continued to the next regular meeting
    Vote: Motion by D. Tolli, second by F. Jones, voted 6-0-0 · p. 1, p. 2
  3. Agenda amendment to discuss Item #4a and Item #6B simultaneously
    Agenda amended
    Vote: Motion by D. Tolli, second by N. Dethlefsen, voted 6-0-0 · p. 2
  4. 12 Northwoods Road – N. Kimball and M. Nasshan – RFR to conduct pond maintenance within a regulated area
    Request for continuance granted and Request for Review continued to the next regular meeting
    Vote: Motion by F. Jones, second by S. Okie, voted 6-0-0 · p. 2
  5. 199 Barn Door Hills Road – J. Lambert c/o Lambert's Lawn Care – RFR for pond and culvert maintenance, plantings, and invasive species management
    Approved as an As of Right Determination per IWWC Regulations Section 4.1.d, limited to stabilization of the site, invasives removal, drainage, and boulder placement; underground electrical conduit and water line for fountain require a permit application
    Vote: Motion by J. Laudati, second by S. Okie, voted 6-0-0 · p. 2, p. 3
  6. 45 Barkhamsted Road – N. Higley – RFR to excavate and remove debris from front yard and reestablish lawn within a regulated area
    Approved as an As of Right Determination per IWWC Regulations Section 4.1.d
    Vote: Motion by J. Laudati, second by S. Okie, voted 6-0-0 · p. 3
  7. 7 Laurel Drive – C. Fontaine and R. Weiner – Permit request for prefabricated shed, drainage piping, tree removal, split-rail fence and lawn restoration within a regulated area
    Application and draft approval letter approved as amended
    Vote: Motion by B. Schmitt, second by N. Dethlefsen, voted 4-1-0 (D. Tolli opposed) · p. 3, p. 4
  8. 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Agent Report update re: Conducting a Regulated Activity without a valid IWWC Permit
    Agenda item continued to the next regular meeting
    Vote: Motion by N. Dethlefsen, second by B. Schmitt, voted 5-0-0 · p. 4
  9. 53 West Granby Road and 215 Salmon Brook Street – Town of Granby – Permit application to construct a walking path and associated improvements within a regulated area
    Application and draft approval letter approved as presented
    Vote: Motion by S. Okie, second by D. Tolli, voted 6-0-0 · p. 5
  10. Adjournment
    Meeting adjourned at 9:50 p.m.
    Vote: Motion by S. Okie, second by N. Dethlefsen, voted 6-0-0 · p. 5

Also discussed (5)

  • Recusal of J. Laudati: J. Laudati recused at 7:49 p.m. · p. 2
  • 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – RFR for site evaluation and stabilization of erosion and sedimentation issues: Application received and continued to the next regular meeting; staff noted it must be a permit request with submittal of the corresponding fee · p. 4
  • Recusal of J. Laudati: J. Laudati recused at 9:21 p.m. · p. 4
  • 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – RFR to establish a cattle farm with paddocks, run-in sheds, underground electrical conduit, etc.: Tabled per the request of applicant representative Attorney Furey · p. 5
  • Recess: Commission took a 4-minute recess at 9:43 p.m.; J. Laudati re-seated at 9:43 p.m. · p. 5
Summary of the agenda: IWWC Agenda

AI-generated summary.

This is the Granby Inland Wetlands and Watercourses Commission agenda for its October 14, 2026 regular meeting. It lists items on the agenda only, with no votes or outcomes recorded yet.

On the agenda (11)

  1. Action on the September 9, 2026, Meeting Minutes · p. 1
  2. Public Hearing: 37 Hartford Avenue – F. Devine – Permit application for regulated activities in connection with development of a 16-unit apartment building and associated site improvements (opened/continued from 7/8/26) · p. 1
  3. Show Cause Hearing: 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a regulated activity without a valid IWWC Permit (opened/continued from 7/8/26) · p. 1
  4. Request for Review: 12 Northwoods Road – N. Kimball and M. Nasshan – RFR to conduct pond maintenance within a regulated area (received/continued from 9/9/26) · p. 1
  5. Request for Review: 199 Barn Door Hills Road – J. Lambert c/o Lambert's Lawn Care – RFR to conduct pond and culvert maintenance, plantings, and invasive species management within a regulated area · p. 1
  6. Request for Review: 45 Barkhamsted Road – N. Higley – RFR to excavate and remove debris from front yard and reestablish lawn area within a regulated area · p. 1
  7. Permit Request: 53 West Granby Road and 215 Salmon Brook Street – Town of Granby – Permit application to construct a walking path and associated improvements within a regulated area (received/continued from 9/9/26) · p. 1
  8. Permit Request: 7 Laurel Drive – C. Fontaine and R. Weiner – Place a prefabricated shed on crushed stone, install drainage piping, remove pine trees, install split-rail fence and restore lawn within a regulated area (received/continued from 9/9/26) · p. 1
  9. Request for Review: 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – RFR for site evaluation and stabilization of erosion and sedimentation issues within a regulated area · p. 1
  10. Agent Report and Correspondence: Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a regulated activity without a valid IWWC Permit · p. 1
  11. Request for Review: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – RFR to establish a cattle farm with paddocks, run-in sheds, underground electrical conduit, etc. · p. 1

Full text of the documents

View the minutes PDF on this page (IWWC Minutes) Open the PDF
Text of the minutes (IWWC Minutes, 5 pages)

Page 1 · open in PDF

 
1 
MEETING MINUTES 
Town of Granby 
Inland Wetlands and Watercourses Commission 
Wednesday, October 14, 2026, at 7:00 p.m. 
 
PRESENT: Nick Dethlefsen, David Tolli, Sue Okie, John Laudati, Barbara Schmitt, and Fred Jones 
ALSO PRESENT: IWWC Agent Kate Bednaz and Land Use Coordinator Renee Deltenre (Zoom) 
 
1. Call to Order 
Chair J. Laudati called the meeting to order at 7:00 p.m. 
 
2. Action on the September 9, 2026, Meeting Minutes 
 
ON A MOTION by S. Okie seconded by B. Schmitt, the Commission voted 6-0-0 to approve 
the September 9, 2026, meeting minutes as amended to reflect the following changes: 
a. Top of page 2, change “shall connect” to “should connect”. 
b. Middle of page 4, convert sentence starting with “K. Bednaz…” into item #7c. 
 
3. Public Hearings 
a. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in 
connection with the development of a 16-unit apartment building and associated site 
improvements.  
Professional Engineer Rebecca Li was present to discuss the application, along with applicant 
Forrest Devine and Attorney Rachel Fancy. R. Li ran through the application timeline and 
documentation submitted to date, noting that a thorough and good faith effort has been made 
to address all comments/concerns. F. Devine submitted three documents that contain findings 
and supporting documentation related to the intervenor’s Professional Engineer Steve 
Trinkaus and read his letter into the record.  
 
Public Comment 
Attorney George Schober, representative for abutting property owner Peter Voskowsky, 
spoke in defense of Professional Engineer Steve Trinkaus and claims that F. Devine’s letter 
and comments are irrelevant. Attorney Schober claims that the application is incomplete and 
no documentation regarding the impact of stormwater/effluent has been provided. It was 
stated that feasible and prudent alternatives consist of connecting to public sewer or reducing 
the unit count. 
 
Professional Engineer Steve Trinkaus responded to comments and documentation provided 
by Forrest Devine. He noted that no groundwater water monitoring has been conducted, so 
there is not enough data to determine groundwater levels and direction of flow. Only a small 
portion of the site is available for nitrogen dilution and a pollutant loading analysis was not 
provided.  
 
Jack LaReau of the Salmon Brook Water District expressed concerns regarding potential 
nitrogen levels and groundwater pollution. He provided information regarding the existing 
aquifers in the area and is opposed to any waiver or compromise of the IWWC Regulations.  
 

Page 2 · open in PDF

 
2 
Reinhard Maier, 138 Day Street, stated that he is not against development, just concerned 
with pollution. He stated concerns regarding the proposed septic and leaching system and 
noted that a third option was never considered by the applicant, which is a high-reduction 
nitrogen, low-discharge system.  
 
Robert Flanigan, 24 Woodcliff Drive, spoke in opposition to the project citing concerns of 
potential wetlands contamination due to seepage of effluent, as well as surface treatment of 
the parking lot. 
 
Maureen Eberly, 37 Silkey Road, stated that the developer should conduct a market analysis 
and urged the Commission to reject the proposal.  
 
R. Li reminded the Commission that a sewer extension feasibility analysis was provided on 
7/8/26 and has no further comments.  
 
ON A MOTION by D. Tolli seconded by F. Jones, the Commission voted 6-0-0 to close the 
public hearing at 7:46 p.m. and continue the application to the next regular meeting.  
 
ON A MOTION by D. Tolli seconded by N. Dethlefsen, the Commission voted 6-0-0 to amend the 
agenda to discuss Item#4a and Item#6B simultaneously.  
 
J. Laudati was recused at 7:49 p.m. 
 
4. Show Cause Hearing 
a. 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a Regulated Activity without 
a valid IWWC Permit. 
This agenda item was discussed as part of agenda item #6b. 
 
J. Laudati was seated at 8:22 p.m.  
 
5. Request for Review 
a. 12 Northwoods Road – N. Kimball and M. Nasshan – RFR to conduct pond 
maintenance within a regulated area.  
Applicants/property owners Nicholas Kimball and Marissa Nasshan submitted a request for 
continuance prior to the meeting. 
 
ON A MOTION by F. Jones seconded by S. Okie, the Commission voted 6-0-0 to grant the 
request and continue the Request for Review to the next regular meeting.  
 
b. 199 Barn Door Hills Road – J. Lambert c/o Lambert’s Lawn Care – RFR to conduct 
pond and culvert maintenance, plantings, and invasive species management within a 
regulated area.  
Applicant Joseph Lambert of Lambert’s Lawn Care was present to discuss the application. 
He is seeking permission to restore an existing pond on-site that is suffering from low water 
levels due to the overgrowth of invasive species, the accumulation of excess sediment, and 
erosion of the pond’s boundaries. Proposed maintenance includes clearing all obstructions 
from the culvert to the pond, removing invasives, adding rock formations and silt fencing to 
stabilize the borders of the pond, and applying all-natural “Muckout” to introduce healthy 

Page 3 · open in PDF

 
3 
bacteria and enzymes back into the water. In order to aerate and oxygenate the water, a 
fountain is proposed in the center of the pond, which would require the installation of 
underground electrical conduit and a water line.  
 
The homeowner would also like to improve other areas of the property by removing 
dead/diseased trees, removing invasives, eliminating raised garden beds, etc. J. Lambert 
noted that establishment of the pond coincides with the development of the Kettle Pond Lane 
subdivision. J. Laudati questioned whether the proposed activities are permitted under an 
RFR or would require a permit. K. Bednaz and the Commission deliberated on the scope of 
work and determined that stabilization of the site, invasives removal, drainage, and boulder 
placement were permitted under the RFR. The installation of underground electrical conduit 
and water line for a water fountain requires the submittal of a permit application.  
 
ON A MOTION by J. Laudati seconded by S. Okie, the Commission voted 6-0-0 to approve 
the application as an As of Right Determination per the Inland Wetlands and Watercourses 
Commission Regulations, Section 4.1.d, limited to the stabilization of the site, invasives 
removal, drainage, and boulder placement. 
 
c. 45 Barkhamsted Road – N. Higley –  RFR to excavate and remove debris from front 
yard and reestablish lawn area within a regulated area. 
Applicant Nicholas Higley was present to discuss the application. He is seeking permission to 
clean up the property by excavating and removing debris that was buried throughout the yard. 
He plans to excavate 2 feet down to capture all the debris, save 3-4” of soil, bring in 
additional soil for a new base, and then spread 18-20” of topsoil. Erosion and sedimentation 
control measures will be installed and once graded, grass seed and mulch will be applied. In 
addition, the construction of a stone wall is proposed. All work is within the 200-foot upland 
review area of Salmon Brook.  
 
ON A MOTION by J. Laudati seconded by S. Okie, the Commission voted 6-0-0 to approve 
the application as an As of Right Determination per the Inland Wetlands and Watercourses 
Commission Regulations, Section 4.1.d. 
 
Agenda item#6A was discussed after agenda item#8. 
 
6. Permit Requests 
b. 7 Laurel Drive – C. Fontaine and R. Weiner – Permit request to place a prefabricated 
shed on crushed stone, install drainage piping, remove pine trees, install a split-rail 
fence and restore lawn within a regulated area.  
Professional Engineer TJ Barresi, as well as property owners Colleen Fontaine and Ross 
Weiner were present to discuss their application, which was received and continued from the 
prior meeting. Revised plans were submitted today that reflect changes in location for the 
shed, yard drain and drainage swale, and address staff comments regarding elevations and a 
mitigation plan. K. Bednaz provided background information on the property, as well as 
observations made during various site inspections. Although some plants required as part of 
the prior Enforcement Order have not survived, she noted that other vegetation has naturally 
taken over.  
 

Page 4 · open in PDF

 
4 
Alternative planting locations were recommended, and a draft approval letter was provided 
for review and consideration by the Commission. Attorney Kari Olson and Soil Scientist 
Thomas Stansfield were present via zoom. T. Stansfield stated that the improvements shown 
on the revised plans were sufficient and would not have an adverse impact on the site. K. 
Olson requested specificity on the alternative plantings and C. Fontaine questioned the 
plantings that were required as part of the prior Enforcement Order. K. Bednaz provided 
clarification, and the Commission reviewed the draft approval letter. 
 
ON A MOTION by B. Schmitt seconded by N. Dethlefsen, the Commission voted 4-1-0 to 
approve the application and draft approval letter as amended. D. Tolli opposed.  
 
c. 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – RFR for site 
evaluation and stabilization of erosion and sedimentation issues within a regulated area.  
Kevin Sullivan and John Gravel (via zoom) were present to discuss the application. In 
response to staff comments at the last meeting, an application was submitted to address the 
aftermath of erosion that occurred on site. K. Bednaz stated that documentation must be 
submitted detailing how much sediment was removed, where it was deposited, how it will be 
removed, a mitigation plan, and timeline. K. Sullivan noted that soil samples were taken and 
they were able to narrow the erosion down to two scours. The plan is to remove the 
sedimentation then put down a native seed mix. Cultivation of the site has begun, and no 
further erosion has occurred since the installation of additional erosion and sedimentation 
control measures. K. Bednaz noted that the application is listed as an RFR and needs to be a 
permit request with submittal of the corresponding fee. The application was received and 
continued to the next regular meeting. 
 
J. Laudati was recused at 9:21 p.m. 
 
7. Agent Report and Correspondence 
a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a 
Regulated Activity without a valid IWWC Permit. 
Attorney Timothy Furey was present on behalf of the property owner to provide updates. 
Based on conversation with Town Attorney Richard Roberts, Attorney Furey will work 
directly with Attorney Roberts on addressing the Enforcement Order, which will then be 
directed to IWWC Agent Kate Bednaz, and finally, the Commission. At this time, no updates 
have been provided from DEEP regarding review of the engineered plans for the dam. 
Attorney Furey provided documentation from Nick Zito of the CT DEEP Forestry Division, 
stating that they have no concerns with respect to the forestry operation on the subject 
property. Logging contractor Matthew Yard spoke in regard to the logging operation he 
conducted on the property, noting that 75 acres were approved for clearing; however, only 
50% was completed. K. Bednaz provided clarification regarding issues surrounding the RFR 
as some of the activities conducted have impacted existing wetlands. She notified the 
Commission that a demand letter has been issued by Town Attorney Richard Roberts and 
stated that all wetland boundaries must be shown on a plan for the cattle RFR to be 
considered.  
 
ON A MOTION by N. Dethlefsen seconded by B. Schmitt, the Commission voted 5-0-0 to 
continue this agenda item to the next regular meeting. 
 

Page 5 · open in PDF

 
5 
8. Request for Review 
a. 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – RFR to establish a cattle 
farm with paddocks, run-in sheds, underground electrical conduit, etc.  
This agenda item was tabled per the request of applicant representative Attorney Furey.  
 
J. Laudati was re-seated at 9:43 p.m. 
The Commission took a 4-minute recess at 9:43 p.m. 
 
6.   Permit Requests 
a.  53 West Granby Road and 215 Salmon Brook Street – Town of Granby – Permit 
application to construct a walking path and associated improvements within a regulated 
area. 
Since the application was received and discussed at the prior meeting, revised plans have 
been submitted to address all outstanding items. IWWC Agent Kate Bednaz and the 
Commission had no questions or concerns.  
 
ON A MOTION by S. Okie seconded by D. Tolli, the Commission voted 6-0-0 to approve 
the application and draft approval letter as presented.  
 
9. Commissioner Reports and Correspondence 
None 
 
10. Adjourn 
 
ON A MOTION by S. Okie seconded by N. Dethlefsen, the Commission voted 6-0-0 to adjourn 
the meeting at 9:50 p.m. 
 
Respectfully submitted, 
 
 
 
Renee Deltenre 
Land Use Coordinator 
 
View the agenda PDF on this page (IWWC Agenda) Open the PDF
Text of the agenda (IWWC Agenda, 1 page)

Page 1 · open in PDF

Town of Granby 
Inland Wetlands and Watercourses Commission 
Regular Meeting Agenda 
Wednesday, October 14, 2026, at 7:00 pm 
Town Hall Meeting Room 
 
Please note: Any person who wishes to provide materials for display on the video monitors at an IWWC meeting where such monitors are being used 
to video conference the meetings must email the materials no later than 10 AM on the day of the meeting. All materials must be contained in a single 
attachment to the email.  Materials received after the 10 AM deadline will not be accepted for display. Display of the materials is subject to all other 
rules and procedures of the IWWC. Zip drive, memory sticks and other data storage devices will not be accepted. 
Zoom: https://us06web.zoom.us/j/88097165233?pwd=BeaLXJaV2bhzELdbzFhI2QZs2Ne0un.1 
Call In: 929-205-6099 
Meeting ID: 899 2735 9975 
Passcode: 146326 
 
1. Call to Order 
 
2. Action on the September 9, 2026, Meeting Minutes 
 
3. Public Hearings 
a. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in connection with the 
development of a 16-unit apartment building and associated site improvements. (Opened/continued from 
7/8/26) 
 
4. Show Cause Hearing 
a. 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a Regulated Activity without a valid IWWC 
Permit. (Opened/continued from 7/8/26) 
 
5. Request for Review 
a. 12 Northwoods Road – N. Kimball and M. Nasshan – RFR to conduct pond maintenance within a regulated 
area. (Received/continued from 9/9/26) 
b. 199 Barn Door Hills Road – J. Lambert c/o Lambert’s Lawn Care – RFR to conduct pond and culvert 
maintenance, plantings, and invasive species management within a regulated area.  
c. 45 Barkhamsted Road – N. Higley –  RFR to excavate and remove debris from front yard and reestablish 
lawn area within a regulated area. 
 
6. Permit Requests 
a. 53 West Granby Road and 215 Salmon Brook Street – Town of Granby – Permit application to construct a 
walking path and associated improvements within a regulated area. (Received/continued from 9/9/26) 
b. 7 Laurel Drive – C. Fontaine and R. Weiner – Permit request to place a prefabricated shed on crushed stone, 
install drainage piping, remove pine trees, install a split-rail fence and restore lawn within a regulated area. 
(Received/continued from 9/9/26) 
c. 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – RFR for site evaluation and 
stabilization of erosion and sedimentation issues within a regulated area.  
 
7. Agent Report and Correspondence 
a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated Activity 
without a valid IWWC Permit. 
 
8. Request for Review 
a. 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – RFR to establish a cattle farm with paddocks, 
run-in sheds, underground electrical conduit, etc.  
 
9. Commissioner Reports and Correspondence 
 
10. Adjourn 
Text of the packet (IWWC Meeting Packet, 129 pages)

Page 1

Town of Granby 
Inland Wetlands and Watercourses Commission 
Regular Meeting Agenda 
Wednesday, October 14, 2026, at 7:00 pm 
Town Hall Meeting Room 
 
Please note: Any person who wishes to provide materials for display on the video monitors at an IWWC meeting where such monitors are being used 
to video conference the meetings must email the materials no later than 10 AM on the day of the meeting. All materials must be contained in a single 
attachment to the email.  Materials received after the 10 AM deadline will not be accepted for display. Display of the materials is subject to all other 
rules and procedures of the IWWC. Zip drive, memory sticks and other data storage devices will not be accepted. 
Zoom: https://us06web.zoom.us/j/88097165233?pwd=BeaLXJaV2bhzELdbzFhI2QZs2Ne0un.1 
Call In: 929-205-6099 
Meeting ID: 899 2735 9975 
Passcode: 146326 
 
1. Call to Order 
 
2. Action on the September 9, 2026, Meeting Minutes 
 
3. Public Hearings 
a. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in connection with the 
development of a 16-unit apartment building and associated site improvements. (Opened/continued from 
7/8/26) 
 
4. Show Cause Hearing 
a. 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a Regulated Activity without a valid IWWC 
Permit. (Opened/continued from 7/8/26) 
 
5. Request for Review 
a. 12 Northwoods Road – N. Kimball and M. Nasshan – RFR to conduct pond maintenance within a regulated 
area. (Received/continued from 9/9/26) 
b. 199 Barn Door Hills Road – J. Lambert c/o Lambert’s Lawn Care – RFR to conduct pond and culvert 
maintenance, plantings, and invasive species management within a regulated area.  
c. 45 Barkhamsted Road – N. Higley –  RFR to excavate and remove debris from front yard and reestablish 
lawn area within a regulated area. 
 
6. Permit Requests 
a. 53 West Granby Road and 215 Salmon Brook Street – Town of Granby – Permit application to construct a 
walking path and associated improvements within a regulated area. (Received/continued from 9/9/26) 
b. 7 Laurel Drive – C. Fontaine and R. Weiner – Permit request to place a prefabricated shed on crushed stone, 
install drainage piping, remove pine trees, install a split-rail fence and restore lawn within a regulated area. 
(Received/continued from 9/9/26) 
c. 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – RFR for site evaluation and 
stabilization of erosion and sedimentation issues within a regulated area.  
 
7. Agent Report and Correspondence 
a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated Activity 
without a valid IWWC Permit. 
 
8. Request for Review 
a. 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – RFR to establish a cattle farm with paddocks, 
run-in sheds, underground electrical conduit, etc.  
 
9. Commissioner Reports and Correspondence 
 
10. Adjourn 

Page 2

 
1 
MEETING MINUTES 
Town of Granby 
Inland Wetlands and Watercourses Commission 
Wednesday, September 9, 2026, at 7:00 p.m. 
 
PRESENT: Nick Dethlefsen, David Tolli, Sue Okie, John Laudati, Barbara Schmitt, and Fred 
Jones (via Zoom) 
ALSO PRESENT: IWWC Agent Kate Bednaz and Land Use Coordinator Renee Deltenre 
 
1. Call to Order 
Chair J. Laudati called the meeting to order at 7:00 p.m. 
 
2. Action on the August 12, 2026, Meeting Minutes 
 
ON A MOTION by D. Tolli, seconded by S. Okie, the Commission voted 4-0-0 to approve 
the August 12, 2026, minutes as presented. J. Laudati and S. Okie abstained. 
 
3. Public Hearings 
a. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in 
connection with the development of a 16-unit apartment building and associated site 
improvements.  
Professional Engineer Rebecca Li was present to discuss the application. Since the last 
meeting in August, septic approval was received from the CT Department of Public 
Health and Farmington Valley Health District. R. Li provided additional application 
material, which consisted of a project timeline and map of the project area indicating 
septic system locations for the abutting properties. K. Bednaz provided her latest review 
comments, indicating that all concerns have been addressed and it is her opinion that the 
functions and values of the existing wetlands system will not be impacted by this 
development.  
 
Public Comment 
Attorney George Schober spoke on behalf of his client Peter Voskowsky, who is an 
abutting property owner. He requested a continuance of the public hearing so that 
Professional Engineer Steve Trinkaus may have time to review the newly submitted 
material. Attorney Schober proposed feasible and prudent alternatives, such as 
connecting to public sewer or reducing the unit count and expressed concerns regarding 
hydrology and contamination.  
 
Reinhard Maier, 138 Day Street, had concerns regarding the proposed septic and leaching 
system as it pertains to nitrogen dilution and groundwater pollution. 
 
Robert Flanigan, 24 Woodcliff Drive, expressed concerns regarding potential wetlands 
contamination due to seepage of effluent, as well as surface treatment of the parking lot 
during the winter months. 
 

Page 3

 
2 
Maureen Eberly, 37 Silkey Road, questioned the legitimacy of the test pit results, 
invasive species located on site and stated that the development shall connect to public 
sewer.  
 
Ron Levesque of R Levesque Associates, Inc. spoke on behalf of the project and 
submitted a formal request to continue the public hearing to the next regular meeting on 
October 14, 2026.  
 
ON A MOTION by S. Okie seconded by B. Schmitt, the Commission voted 6-0-0 to 
continue the public hearing to the next regular meeting.  
 
4. Show Cause Hearing 
a. 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a Regulated Activity 
without a valid IWWC Permit.  
Professional Engineer TJ Barresi, as well as property owners Colleen Fontaine and Ross 
Weiner were present to discuss their application, which was submitted in response to the 
Enforcement Order issued on 7/2/26. The property owners are seeking permission to 
install an 18” drainage pipe, re-establish a grass line swale, remove six pine trees, place a 
prefabricated shed, install a split-rail fence and restore the existing lawn within a 
regulated area. Discussion ensued regarding the Enforcement Order from the prior 
owners and how the situation was resolved prior to the sale of the home. K. Bednaz 
provided feedback on the application, requesting that the elevations be checked and the 
mitigation plan consist of a 1:1 wetland restoration ratio.  
 
ON A MOTION by D. Tolli seconded by S. Okie, the Commission voted 6-0-0 to 
receive and continue the application to the next regular meeting.  
 
5. Request for Review 
a. 12 Northwoods Road – N. Kimball and M. Nasshan – RFR to conduct pond 
maintenance. 
Applicants/property owners Nicholas Kimball and Marissa Nasshan were present to 
discuss their request for review. They are seeking permission to remove sediment and 
overgrown vegetation from an existing fire pond on their property. Over the summer 
large volumes of rainwater and sediment have accumulated, thus encouraging the rapid 
growth of vegetation that is hindering stream flow and potential backup at the existing 
culvert. The subject area is approximately 40 square feet, and an excavator would be 
utilized from the driveway to remove the material. K. Bednaz provided feedback on the 
application, noting that additional information is required. The applicants were directed 
to calculate the total volume of disturbed area, which will determine if an IWWC permit 
is required, consider a pumping and diversion plan, and locate a suitable location to 
stockpile or spread the sediment onsite.   
 
ON A MOTION by D. Tolli seconded by B. Schmitt, the Commission voted 6-0-0 to 
receive and continue the application to the next regular meeting.  
 

Page 4

 
3 
b. 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – RFR for 
mitigation and site stabilization within a regulated area.  
Aaron Svedlow of Greenfield Development and Kevin Sullivan were present on behalf of 
Broadleaf Solar to discuss the application. K. Sullivan explained that sorghum was 
planted to establish a cover cop that would address erosion issues and stabilize the area. 
In due time, the existing crop will either be mowed and left as a thatch, or it may be 
mowed down and tilled into the soil to establish another crop. K. Bednaz provided a brief 
overview of the project, noting a failure among the erosion and sedimentation controls 
last month. 218 acres were tilled and planted, and silt fence and waddles were also 
installed to help control erosion. K. Bednaz indicated that an IWWC Permit is required to 
address the aftermath of the erosion, detailing how much sediment was removed, where it 
was deposited, how it will be removed, a mitigation plan, and timeline.  
 
ON A MOTION by S. Okie seconded by D. Tolli, the Commission voted 6-0-0 that the 
proposed activity is As of Right under the farming provision in Section 4.1a. 
 
6. Permit Requests 
a. 53 West Granby Road and 215 Salmon Brook Street – Town of Granby – Permit 
application to construct a walking path and associated improvements within a 
regulated area. 
K. Bednaz presented the application on behalf of the Town of Granby, which was 
received by the Commission this evening. The proposal consists of constructing a 
pedestrian walking path from the parking lot located at 53 West Granby Road to the 
soccer fields located at 215 Salmon Brook Street (Salmon Brook Park). The path will be 
constructed in the same location of the existing woods trail and consists of a series of 
stairs to address the steep slope. The total project area is approximately 25,580 square 
feet and will have a five-foot wide, 1,514-foot bituminous concrete path within the 
existing grass area and a six-foot wide, 630-foot stone dust path with stairs within the 
woods. Approximately 1,600 feet of bituminous walk will be located in wetland 
(floodplain) soils, and the reconstructed woods path will cover approximately 2,722 
square feet of wetlands/regulated area. In addition, a total of 15,000 square feet of 
wetland (floodplain) area will be disturbed; of which 9,960 square feet will be temporary. 
 
ON A MOTION by D. Tolli seconded by N. Dethlefsen, the Commission voted 6-0-0 to 
receive and continue the application to the next regular meeting.  
 
J. Laudati left the meeting at 9:15 p.m. 
 
7. Agent Report and Correspondence 
a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – 
Conducting a Regulated Activity without a valid IWWC Permit. 
Attorney Timothy Furey was present on behalf of the property owner to provide updates, 
along with Soil Scientist David Lord who addressed comments raised at the prior 
meeting. Attorney Furey noted that revised drawings were recently submitted to DEEP 
from Professional Engineer Karl Acimovic and Robert Green Associates, LLC. D.  

Page 5

 
4 
Lord discussed existing conditions related to soil erosion and sedimentation, as well as 
existing wetlands in the paddock areas. K. Bednaz reiterated that an existing conditions 
and comprehensive mitigation plan for the areas outside of DEEP’s jurisdiction has not 
been submitted. Since no mapped wetlands delineation has been provided, she requested 
a meeting on-site to view and discuss the flagged wetlands in order to move things 
forward. In advance of the next meeting, the property owner was directed to provide the 
boundaries of disturbance, along with a wetland delineation and mitigation plan for the 
entire site. 
 
ON A MOTION by D. Tolli seconded by B. Schmitt, the Commission voted 5-0-0 to 
continue this agenda item to the next regular meeting. 
 
F. Jones left the meeting at 9:54 p.m. 
 
b. 54 Hartford Avenue – B. Richard – Permit request to construct a 14’x24’ 
prefabricated shed on crushed stone within a regulated area. Authorized Agent 
approval 9/4/26. 
 
K. Bednaz provided an update regarding the bridge installation at 15 Peck Orchard Road, 
stating that everything was in good order. 
 
8. Commissioner Reports and Correspondence 
None 
 
9. Adjourn 
 
ON A MOTION by N. Dethlefsen seconded by B. Schmitt, the Commission voted 4-0-0 to 
adjourn the meeting at 9:58p.m. 
 
Respectfully submitted, 
 
 
 
Renee Deltenre 
Land Use Coordinator 
 
 
 

Page 6

 
 
The following 5 items 
were received after 
the meeting packet 
was posted. 

Page 7

Outlook
37 Hartford ave- Letter to commission
From Forrest Devine <forrestdevine7@gmail.com>
Date Wed 10/14/2026 1:21 PM
To Granby Wetlands Agent <wetlandsagent@granby-ct.gov>
Cc Renee Deltenre <RDeltenre@granby-ct.gov>; george@schoberschober.com <george@schoberschober.com>;
strinkaus@earthlink.net <strinkaus@earthlink.net>; Abigail Kenyon <akenyon@granby-ct.gov>; Rebecca Li
<RebeccaL@rlaland.com>; Rob Levesque <robl@rlaland.com>; Nina Fazio <ninaf@rlaland.com>; Fancy, Rachel
<rmf@fitzgeraldpc.com>
3 attachments (1 MB)
Letter to Chair-37 Hartford ave granby.pdf; Trinkaus Review Comparisions.docx; 26-1636 (Project Husky) - RC Letter - Trinkaus Cases 10-5-
26.pdf;
 
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the
content is safe.
 
October 14, 2026
To: Kate Bednaz
Inland Wetlands Agent
Town of Granby
15 North Granby Road
Granby, CT 06035
Re: 37 Hartford Avenue – Submission of Supporting Documentation
Dear Kate,
On behalf of Devine Construction Inc., I am submitting three documents for inclusion in the public hearing record regarding our proposed development at 37
Hartford Avenue.
I want to clarify that these documents do not introduce any new information regarding the proposed development, site conditions, engineering, or
environmental impacts. Rather, they contain findings and supporting documentation related to the intervenor’s professional engineer, Steven Trinkaus, P.E.,
and the nature of his reviews and comments.
The purpose of this submission is to provide the Commission with additional context regarding the professional opinions and statements already presented
during the hearing process.
We respectfully request that you read this correspondence into the public hearing record and enter all three attached documents into the official
record for the Commission’s consideration.
We appreciate your assistance and the Commission’s continued time and attention to this application.
Sincerely,
Forrest Devine
Devine Construction Inc.
413-478-9691
forrestdevine7@gmail.com
Attachments: Three supporting documents regarding the intervenor’s professional engineer.

Page 8

October 14, 2026
John Laudati, Chairman
Town of Granby Inland Wetlands & Watercourses Commission
15 North Granby Road
Granby, Connecticut 06035
Re: Trinkaus Engineering Reviews & Relation to the Proposed 37 Hartford Avenue Project
Dear Chairman Laudati and Commissioners,
Devine Construction is respectfully submitting the enclosed comparison regarding the review
comments provided by the intervening party’s consultant, Mr. Trinkaus, concerning the proposed
development at 37 Hartford Avenue.
We respect the intervening party’s right to participate in this process and understand the importance
of reviewing potential environmental impacts. Our concern is whether the comments provided
accurately reflect the conditions at our project site and are supported by site-specific information and
technical evidence.
In reviewing the correspondence received by Steven Trinkaus, P.E., along with publicly available
news articles, court decisions, and materials from other Connecticut projects involving Mr. Trinkaus,
we identified identical language and similar claims across multiple project reviews. The enclosed
materials include examples of repetitive language from Mr. Trinkaus’ reviews, as well as a recent
letter from the legal counsel for a project proponent in another town where Mr. Trinkaus provided a
third-party review. Given the differences in site conditions and proposed work among these projects,
we believe these similarities are worth bringing to the Commission’s attention.
We recognize that similar environmental concerns can arise at different sites, and that repeated
language alone does not mean a technical opinion is incorrect. However, based on the identical
language being utilized between multiple independent reviews on various projects, the multiple
cases referenced by the Robinson & Cole letter dated 10/05/2026, show a distinct pattern taken in
the intervention process.
Forrest Devine  |  413-478-9691  |  forrestdevine7@gmail.com

Page 9

We believe the comments submitted for 37 Hartford Avenue should be evaluated within the
regulatory context and scale applicable to our project. Many of the comments provided are not only
copied and pasted from other review letters, but are not applicable, or based on a regulatory
framework or guidance documents.
We respectfully ask the Commission to consider the project on its merits and the record established
during the public hearing process.
Signed:
Forrest Devine
Forrest Devine  |  413-478-9691  |  forrestdevine7@gmail.com

Page 10

1. Summary of findings 
• Letters reviewed: 17 Trinkaus review letters or reports covering 13 projects in 11 
municipalities (Madison, Greenwich, New Canaan, Wilton, Milford, North Haven, 
Plymouth, Woodbridge, Newtown, Easton, Granby), dated April 2021 through August 
2026. 14 are full text from municipal and state websites. 3 are his comments as reproduced 
or quoted by others (Granby by RLA, Newtown by Civil 1, Wilton 2/11/2026 by the Town's 
peer reviewer Tighe & Bond). Letters in four court matters (Fairfield Housing, 15 
Unquowa Rd, 751 Weed St, Gagnon) are known only through passages the courts quoted 
(Section 6). 
• Recurring formulas:  the Executive Summary conclusion that the system "will not 
adequately reduce non-point source pollutant loads which will result in increased pollutant 
loads being discharged to the [wetland/watercourse]" recurs, with only the receiving water 
changed, in Milford, Woodbridge, Easton, Newtown, Madison (variant) and Granby 
(variant), and in 2022 Fairfield reports quoted by the courts. 
• Court observation already on record:  in 751 Weed Street v. New Canaan P&Z  
(O'Hanlan, J., July 1, 2025, p. 84 n.), the court said his testimony "is nearly identical to his 
testimony in other matters" and quoted his Fairfield, Unquowa and Gagnon language side 
by side. 
 

Page 11

Side-by-side passages (repeated text highlighted) 
2a. "Magically reduced" critique of the 2024 Manual retention-volume rule 
Letter Passage (yellow = shared with another project's letter) 
ESR-26a 
Saddle Ridge Cluster 
Subdivision 
Easton IWWA / 
Conservation Comm. 
Feb. 1, 2026 
The applicant claims that since they are containing the water quality volume in the  stormwater system, the pollutant loads are 
magically reduced as the following language from the CT DEEP 2024 Storm Water Quality Manual seems to imply: "Achieving 
these minimum required load reductions for sediment and nutrients is assumed to provide adequate reductions of other 
stormwater pollutants including floatable materials. However, it is important to note that if the full retention goal (i.e., Required 
Retention Volume) is met, then it is assumed pollutant reduction is also achieved and individual pollutant calculations are not 
necessary. 
WBH-26 
345 Belden Hill Rd 
senior living 
Wilton IWC 
Feb. 11, 2026 
The applicant claims that since they are containing the water quality volume in the multiple stormwater systems, the pollutan t 
loads are magically reduced as the following language from the  CTDEEP 2024 Storm Water Quality Manual seems to imply: 
"Achieving these minimum required load reductions for sediment and nutrients is assumed to provide adequate reductions of 
other stormwater pollutants including floatable materials. However, it is important to  note that if the full retention goal (i.e., 
Required Retention Volume) is met, then it is assumed pollutant reduction is also achieved and individual pollutant calculations 
are not necessary. 
GRA-26* 
37 Hartford Avenue 
Granby IWWC 
Aug. 2026 review + 
Sept. 3, 2026 replies 
The applicant claims that since they are containing the water quality volume in the multiple stormwater systems, the pollutan t 
loads are magically reduced as the following language from the CT DEEP 2024 Storm Water Quality Manual seems to imply: 
"Achieving these minimum required load reductions for sediment and nutrients is assumed to provide adequate reductions of 
other stormwater pollutants including floatable materials. However, it is important to note that if the full retention goal ( i.e., 
Required Retention Volume) is met, then it is assumed pollutant reduction is also achieved and individual pollutant calculations 
are not necessary. 
ESR-26b 
Saddle Ridge Cluster 
Subdivision 
Easton IWWA / 
Conservation Comm. 
Aug. 31, 2026 
The applicant claims that since they are containing the water quality volume in the  stormwater system, the pollutant loads are 
magically reduced as the following language from the CT DEEP 2024 Storm Water Quality Manual seems to imply: "Achieving 
these minimum required load reductions for sediment and nutrients is assumed to provide adequate reductions of other 
stormwater pollutants including floatable materials. However, it is important to note that if the full retention goal (i.e., Required 
Retention Volume) is met, then it is assumed pollutant reduction is also achieved, and individual pollutant calculations are not 
necessary. 

Page 12

2b. "Not supported by science for the following reasons" – five-part list (a–e) 
Letter Passage (yellow = shared with another project's letter) 
ESR-26a 
Saddle Ridge Cluster 
Subdivision 
Easton IWWA / 
Conservation Comm. 
Feb. 1, 2026 
The above statement is not supported by science for the following reasons: m. Treatment Processes: Effective removal relies on 
specific physical, chemical, and biological processes occurring within the practice, such as sedimentation, filtration, adsorption, 
and microbial action. Holding the water simply provides the opportunity for these process to work. n. Design and Maintenance: 
The specific design of the practice (e.g., detention pond, rain garden, permeable pavement) and its ongoing maintenance are vital 
for ensuring these processes function correctly. Clogged systems or short-circuiting flow paths can drastically reduce efficiency, 
even if the total volume is captured. o. Pollutant Characteristics: Different pollutants behave differently. Suspended solids often 
settle out well, while dissolved nutrients (like nitrogen and phosphorus) or certain chemicals might require specialized treatment 
components or longer retention times for effective removal. p. Storm Dynamics: The WQV is typically designed for a specific 
"design storm" (e.g., the first flush or a 90% storm event) [1]. Larger or more intense storms may overwhelm the system, resulting 
in bypass or reduced treatment efficiency for the excess volume. q. Many stormwater practices found in the 2024 CT DEEP 
Storm Water Quality Manual are incapable of providing the high level of reduction required. As an example, a Dry Detention 
Basin is rated by CT DEEP to have Moderate TSS removal and low TP and TP removal, so it does not matter how much water 
is held in a Dry Detention Basin, the required pollutant load reductions will never be met as the system cannot provide them. 
WBH-26a 
345 Belden Hill Rd 
senior living 
Wilton IWC 
Feb. 11, 2026 
The above statement is not supported by science for the following reasons: a. Treatment Processes: Effective removal relies o n 
specific physical, chemical, and biological processes occurring within the practice, such as sedimentation, filtration, adsorption, 
and microbial action. Holding the water simply provides the opportunity for these processes to work. b. Design and Maintenance: 
The specific design of the practice (e.g., detention pond, rain garden, permeable pavement) and its ongoing maintenance are vital 
for ensuring these processes function correctly. Clogged systems or short-circuiting flow paths can drastically reduce efficiency, 
even if the total volume is captured. c. Pollutant Characteristics: Different pollutants behave differently. Suspended solids often 
settle out well, while dissolved nutrients (like nitrogen and phosphorus) or certain chemicals might require specialized treatment 
components or longer retention times for effective removal. d. Storm Dynamics: The WQV is typically designed for a specific 
"design storm" (e.g., the first flush or a 90% storm event). Larger or more intense storms may overwhelm the system, resulting 
in bypass or reduced treatment efficiency for the excess volume. e. Many stormwater practices found in the 2024 CTDEEP 
Storm Water Quality Manual are incapable of providing the high level of reduction required. As an example, a Dry Detention 
Basin is rated by CTDEEP to have Moderate TSS removal and low TP and TN removal, so it does not matter how much water 
is held in a Dry Detention Basin, the required pollutant load reductions will never be met as the system cannot provide them. 

Page 13

GRA-26 
37 Hartford Avenue 
Granby IWWC 
Aug. 2026 review + 
Sept. 3, 2026 replies 
The above statement is not supported by science for the following reasons: Treatment Processes: Effective removal relies on 
specific physical, chemical, and biological processes occurring within the practice, such as sedimentation, filtration, adsorption, 
and microbial action. Holding the water simply provides the opportunity for these processes to work. Design and Maintenance: 
The specific design of the practice (e.g., detention pond, rain garden, permeable pavement) and its ongoing maintenance are vital 
for ensuring these processes function correctly. Clogged systems or short-circuiting flow paths can drastically reduce efficiency, 
even if the total volume is captured. Pollutant Characteristics: Different pollutants behave differently. Suspended solids of ten 
settle out well, while dissolved nutrients (like nitrogen and phosphorus) or certain chemicals might require specialized treatment 
components or longer retention times for effective removal. Storm Dynamics: The WQV is typically designed for a specific 
"design storm" (e.g., the first flush or a 90% storm event) [1]. Larger or more intense storms may overwhelm the system, resulting 
in bypass or reduced treatment efficiency for the excess volume. Many stormwater practices found in the 2024 CT DEEP Storm 
Water Quality Manual are incapable of providing the high level of reduction required. As an example, a Dry Detention Basin is 
rated by CT DEEP to have Moderate TSS removal and low TP and TP removal, so it does not matter how much water is held in 
a Dry Detention Basin, the required pollutant load reductions will never be met as the system cannot provide them. 
ESR-26b 
Saddle Ridge Cluster 
Subdivision 
Easton IWWA / 
Conservation Comm. 
Aug. 31, 2026 
The above statement is not supported by science for the following reasons: a. Treatment Processes: Effective removal relies o n 
specific physical, chemical, and biological processes occurring within the practice, such as sedimentation, filtration, adsorption, 
and microbial action. Holding the water simply provides the opportunity for these process to work. b. Design and Maintenance: 
The specific design of the practice (e.g., detention pond, rain garden, permeable pavement) and its ongoing maintenance are vital 
for ensuring these processes function correctly. Clogged systems or short-circuiting flow paths can drastically reduce efficiency, 
even if the total volume is captured. c. Pollutant Characteristics: Different pollutants behave differently. Suspended solids often 
settle out well, while dissolved nutrients (like nitrogen and phosphorus) or certain chemicals might require specialized treatment 
components or longer retention times for effective removal. d. Storm Dynamics: The WQV is typically designed for a specific 
"design storm" (e.g., the first flush or a 90% storm event) [1]. Larger or more intense storms may overwhelm the system, resulting 
in bypass or reduced treatment efficiency for the excess volume. e. Many stormwater practices found in the 2024 CT DEEP 
Storm Water Quality Manual are incapable of providing the high level of reduction required. As an example, a Dry Detention 
Basin is rated by CT DEEP to have Moderate TSS removal and low TP and TP removal, so it does not matter how much water 
is held in a Dry Detention Basin, the required pollutant load reductions will never be met as the system cannot provide them. 

Page 14

3. What courts and other reviewers have said about repetition 
• 751 Weed Street, LLC v. New Canaan P&Z  (Super. Ct., Land Use Docket, O'Hanlan, 
J., July 1, 2025), p. 84 n.: "[T]he court observes that Trinkaus' testimony in this matter —
except for the very last, i.e., road icing—is nearly identical to his testimony in other 
matters." The court then quotes Fairfield Housing, Unquowa and Gagnon (p. 85 n.). 
• 15 Unquowa Road v. Fairfield TPZ (Frazzini, J.T.R., Aug. 20, 2024), as quoted in Weed 
St: his 2022 report concluded "[t]he stormwater management system will not be effective 
at reducing non- point source pollutant loads and will result in increased pollutant loads 
being discharged into the Town of Fairfield drainage system."  
• Newtown, 90 Mt Pleasant Rd: Civil 1 response (Jan. 15, 2026, OCR):  "We have 
previously received this same comment from the respondent on other projects, including 
the Riverview Cinema in Southbury, Connecticut." Also: "The review selectively cites 
isolated provisions of applicable regulations while omitting controlling s ections . . . ." 
These are the applicant's engineer's statements, not findings.  
 

Page 15

Robinson+Cole 
October 5, 2026 
Sandy Eggers, Chair 
Inland Wetlands and Watercourses Commission 
Town of Killingly 
172 Main Street 
Killingly, CT 06239 
E VAN J. S EEMAN 
One State Street 
Hartford, CT 06103 
Main ( 860) 275-8200 
Fax ( 860) 275-8299 
eseeman@rc.com 
Direct ( 860) 275-8247 
Re: Application # 26-1636; Ryan Companies US, Inc. — Project Husky 
Cases Involving Mr. Trinkaus 
Dear Chair Eggers and Members of the Commission: 
This firm represents Ryan Companies US, Inc. ( the " Applicant'). The proposed 
intervenors have hired Steve Trinkaus, P.E., to oppose the Applicant's project. The Applicant 
recognizes that it is the role of the Commission to assess the credibility of witnesses. When 
assessing Mr. Trinkaus' credibility, the Commission should be aware that within the past 2 years, 
the Superior Court of Connecticut has found Mr. Trinkaus to be not  credible  on at least 4 
separate occasions. Relevant quotes from those cases fmding Mr. Trinkaus to be not credible 
appear below: 
Fairfield Housing Corp. v. Cons. Comm'n,  2024 WL 4274779 ( Sept. 19, 2024) 
"Given his inaccuracies, factual incompleteness, and selective omissions, Trinkaus' 
opinions do not constitute a substantial basis of fact sufficient to sustain the 
commission's denial." Id. at 16. 
"Therefore, Trinkaus' conclusions can only be seen as speculative or conjectural, without 
supporting analysis. Further, Trinkaus' views about increased storm water volume, no 
infiltration and poor water quality were based upon selective citation from the DEP 
Manual that omitted parts of the guidelines that, when read together, demonstrated both 
that his criticism was not valid, and that the work of plaintiff's engineer was competent." 
Id. at 15. 
"Trinkaus' opinion regarding infiltration is similarly flawed as incomplete and selective 
in its articulation of DEP guidelines." Id. at 16. 
Boston I Hartford I iNewYork I Washington,DC I Providence I n1iami I Austin I Stamford I Wilmington I Philadelphia I Los Angeles I Albany 
rc.com I Robi nson R Cole i,t.r 

Page 16

Robinson+Cole 
Inland Wetlands and Watercourses Commission 
October 5, 2026 
Page 2 
"Therefore, the reports and evidence from Trinkaus are based on incomplete information 
that is not substantiated by the record developed during the public hearing and upon 
which the commission could rely." Id. at 17. 
751 Weed Street, LLC v. Planning and Zoninz Comm'n,  2025 WL 1878800 ( July 1, 
2025) 
"In sum, the commission's denial is unfounded based on Trinkaus' debunked views. 
Plaintiff's engineer, and even Coplit, but especially Canas, who acted in a classic peer 
review role, and who more than the others, together demonstrated that Trinkaus' views 
were flawed." Id. at 45. 
"Therefore, the overwhelming evidence of record is that evaluation of the pros and cons 
of plaintiff's proposal, fairly and under the statutory standard, was a process that took 
place among the other engineers, not with Trinkaus." Id. 
"The court's review of his July 11, 2022 letter reveals no calculations at all by Trinkaus, 
either to support his positions or to demonstrate that plaintiff's detailed engineering 
calculations in the reports submitted were in error." Id. at 16 n. 32. 
"Further, the court observes that Trinkaus' testimony in this matter — except for the very 
last, i.e., road icing — is nearly identical to his testimony in other matters." Id. at 42 n.62. 
"Reading the transcript of the final hearing made one wonder if Trinkaus was discussing 
a different application than Coplit and D'Andrea, so different was his criticism from their 
apparent, but reasoned, recent consensus that plaintiff had met the legitimate concerns 
raised by Coplit in her analysis and by Canas in his peer review. The court finds it 
significant that Coplit largely ignored Trinkaus...." Id. at 44 n.67. 
"Trinkaus also misrepresented to one commission member who asked for the calculations 
that form the basis for his conclusions that engineering structures would not work, that 
his reports contained such calculations. As noted previously, his reports contain no 
calculations." Id. at 45 n. 68. 
Alimi v. Inland Wetlands Board,  2026 WL 1398286 ( May 12, 2026) 
"The record is clear that Trinkaus' conclusions were factually inaccurate or based on 
outdated information and that he selectively omitted evidence. Plaintiff's engineers 
addressed these inaccuracies and defects on the record and Trinkaus made no effort to 
either refute the criticism or, even worse, to correct his own statements." Id. at 36. 

Page 17

Robinson+Cole 
Inland Wetlands and Watercourses Commission 
October 5, 2026 
Page 3 
"In sum, Trinkaus' views, relying upon obsolete, partial or false factual bases, were 
clearly unsound.... Given his inaccuracies, factual incompleteness, and selective 
omissions and his failure to provide any detailed analysis to refute that of the qualified 
engineers he was critiquing, Trinkaus' opinions do not constitute a substantial basis of 
fact sufficient for the board to rely on them to deny plaintiff's application." Id. at 37. 
"[U]nder no scenario could it be said that his [ Trinkaus] views provided a qualitative or 
quantitative basis for the denial." Id. at 38. 
"As this court has previously observed, Trinkaus' views are generally consistent with 
views he has given in opposition to several other developments." Id. at 38 n. 56. 
"Finally, as to Trinkaus' opinion that the soils would not infiltrate stormwater, this is 
demonstrably false." Id, at 38. 
Gorra v. Honeycomb Real Estate Partners,  2026 WL 2241069 ( July 31, 2026) 
"While the commission did not address these glaring defects in Trinkaus' testimony 
directly, they are readily apparent...." Id. at 12. 
"Also, Jacobson Engineering revealed that certain authority Trinkaus cited could not be 
found and respectfully disagreed with other sources that he cited." Id. at 13. 
"In sum, an examination of the record exposes the stark qualitative difference between 
Jacobson Engineering's measured tone and detail, in its role as consulting engineer to the 
commission, and Trinkaus' repetitive conclusions and inaccuracies, made without 
supporting detail or analysis." Id. at 13. 
"As discussed further herein, Trinkaus made factual misrepresentations in his evaluations 
of defendants' stormwater management plan ... and in his testimony ... in which he 
continued to repeat criticism about stormwater capacity of the town's system that 
Jacobson Engineering had shown to be inaccurate and rested generally on concern and 
speculation about pollution to non-specific wetlands that he could neither quantify or 
even identify. Such evidence would not have been sufficient to deny defendants' 
application." Id. at 10 n.15. 
"Similar conduct of Trinkaus as an opposition expert in other cases has been observed by 
this court." Id. at 12 n.19. 

Page 18

Robinson+Cole 
Inland Wetlands and Watercourses Commission 
October 5, 2026 
Page 4 
The Applicant respectfully requests that when assessing the credibility of Mr. Trinkaus it 
consider the cases discussed above. When it does so, the Commission should find Mr. Trinkaus 
not credible. Thank you for your attention to this matter. 
Sincerely, 
Evan J. Seeman 
Robinson & Cole LLP 
Attorneys for Ryan Companies US, Inc. 

Page 19

R LEVESQUE ASSOCIATES, INC. 
40 School Street, P.O. BOX 640, Westfield, MA 01085 
p 413.568.0985  ·  f 413.568.0986  ·  www.rlaland.com 
 
A L AND PL ANNING SERVICES COMPANY 
 
October 14, 2026 
 
Via email: wetlandsagent@granby-ct.gov 
 
John L. Laudati, Chairman 
Town of Granby Inland Wetlands & Watercourses Commission  
15 North Granby Road  
Granby, Connecticut 06035 
 
RE:  Summary Chart 
37 Hartford Avenue  
Granby, Connecticut 06035  
(Parcel ID: 4254) 
RLA Project File No. 251219 
 
Dear Chairman Laudati and Commissioners:  
 
On behalf of the applicant of the above-referenced project, R Levesque Associates, Inc. is providing the 
enclosed summary chart of review comments issued by Mr. Trinkaus for the Commission’s convenience. 
The chart is not intended to introduce new information or serve as a supplemental submission, but rather 
to provide a simplified reiteration of information already included in the record to facilitate the 
Commission’s review. 
 
RLA will refer to the summary chart as part of our presentation at this evening’s meeting. We wanted to 
provide an electronic copy in advance to allow the Commission an opportunity to review the chart  
beforehand. 
 
Thank you for your time and consideration. 
 
Sincerely, 
R LEVESQUE ASSOCIATES, INC.  
 
 
Nina Fazio 
Permitting Coordinator 

Page 20

Comment # Summary Status
ES-A The subsurface sewage disposal system (SSDS) does not comply with environmental requirements for nitrogen, bacteria, and viruses Addressed
ES-B No grounwater monitoring was done on the site to determine the depth and direction of the groundwater table table on the site Addressed
ES-C Stormwater pollutants will reach downgradient wetlands Hypothetical
1 SSDS effluent treatment in coarse-grained soils Addressed
2 No grounwater monitoring was done on the site to determine the depth and direction of the groundwater table table on the site Addressed
3 Nitrogen dilution and bacteria/virus travel-time analyses are required Addressed
4a Nitrogen dilution calculation and alleged exceedance of 10 mg/L at the property line Subjective
4b Bacteria/virus travel-time calculation and alleged insufficient separation to the property line Hypothetical
5 Description of proposed underground stormwater system Addressed
6 Additional test pits required to confirm subsurface conditions before approval Addressed
7 Inlet control structure weir elevation and potential backwater condition Addressed
8 Roof runoff requires treatment due to atmospheric pollutant deposition Addressed
9 Alleged failure to meet TSS, TP, and TN pollutant load reduction requirements Addressed
10 Soluble pollutants from winter deicing will pass through soils and reach wetlands Hypothetical
11 Predicted stormwater travel time to wetlands and pollutant migration Hypothetical
12 Catch basin hood detail does not adequately retain oils and grease Addressed
13 Additional low-impact development (LID) measures should be incorporated Subjective
14 Claim that retention of the Water Quality Volume does not satisfy Stormwater Standard 1 Addressed
15 Water Quality Volume calculation uses areas not tributary to the stormwater system Addressed
16 Pollutant load reductions cannot be established through storage volume alone Addressed
17 Criticism of the CT DEEP Manual's retention-based pollutant reduction methodology Subjective
18 General scientific objections to assumed pollutant reductions, treatment processes, maintenance, and storm events Subjective
19 Additional pollutant loading analysis required due to soil permeability and alleged lack of treatment Addressed
20 Use of the Rawls infiltration rate without an additional safety factor Addressed
21 Alleged requirement to reduce the Rawls rate by 50% under the CT DEEP Manual Addressed
22 Snow storage areas are allegedly inaccessible or insufficient for effective snow management Addressed
37 Hartford Avenue, Granby, CT
Peer Review Summary Chart

Page 21

1 
 
 
Trinkaus Engineering, LLC    
114 Hunters Ridge Road 
Southbury, Connecticut   06488 
203-264-4558 (office) 
+1-203-525-5153 (mobile) 
E-mail:  strinkaus@earthlink.net 
http://www.trinkausengineering.com 
 
     August 10, 2026, Revised to 10/12/26 
 
Mr. John Laudati, Chairman 
Inland Wetlands and Watercourses Commission 
15 North Granby Road 
Granby, Connecticut     06035 
 
    Re: 8-30g Application 
     37 Hartford Avenue 
     Granby, Connecticut  
 
Dear Mr. Laudati and Members of the Inland Wetlands and Watercourses Commission, 
 
At the request of Peter Voskowsky, I have reviewed the information discussed at the 
September 9, meeting of the Inland Wetlands and Watercourses Commission for the above 
referenced project and have the following comments for your consideration. 
 
Executive Summary: 
A. The sewage disposal system as proposed does not comply with environmental 
requirements for nitrogen and bacteria and viruses.  Comment has not been addressed. 
B. No groundwater monitoring was done on the site to determine the depth and direction of 
the groundwater table on the site.   This is critical information to know to be able to 
assess additional environmental impacts on the downgradient wetland area.  Response 
provided, but did not address the comment. 
C. The proposed stormwater management system will result in soluble non-point source 
pollutants being discharged into the groundwater table and ultimately reaching the 
downgradient wetland area.  Comment has not been addressed. 
 
Sewage Disposal System: 
1. Monitoring of groundwater on the site has not been done.   This is necessary to determine 
the depth and direction of groundwater movement under the site.   This is important to 
determine if nitrogen from the proposed sewage disposal system will flow toward or 
away from the downgradient wetland area. 
2. The nitrogen analysis goes hand in hand with the groundwater monitoring as the area 
available for dilution is dependent upon the direction of the groundwater flow. 
 
 
 

Page 22

2 
 
Stormwater Management: 
3. Post-development area (PS-2a) contains the area directed to the stormwater management 
system at the rear of the parcel.   I have prepared a pollutant loading analysis using the 
Schueler Equation to calculate the pollutant loads in pounds for the water quality storm, 
then pollutant reduction values are applied. 
 
Figure 1 - Pollutant Loading Analysis 
   
PROJECT ADDRESS: Granby, Connecticut
PLANNING & ZONING NUMBER:
DATE: 10/12/2026
SCHUELER'S EQUATION: L = (0.226)*(P)*(Pj)*(Rv)*(C)*(A) Where: 
0.226 CONVERSION FACTOR
P WATER QUALITY STORM RAINFALL IN INCHES
Pj FACTOR THAT CORRECTS FOR STORMS WHICH DO NOT GENERATE RUNOFF = 0.9
Rv RUNOFF COEFFICIENT
Rv 0.05 + 0.009(I)
I PERCENT IMPERVIOUS COVERAGE
C POLLUTANT CONCENTRATION IN MG/L
A SUB-WATERSHED AREA IN ACRES
L POLLUTANT LOAD IN POUNDS
P = 1.3 "/24-HOURS
Pj = 0.9
SUB-WATERSHED AREA = 0.691 ACRES (Taken from site plan by engineer)
PERCENT IMPERVIOUS AREA = 75.92 (Taken from site plan by engineer)
Rv = 0.73328
LAND USE: High Density Residential (8+ units/acre) (See Sheet 2 for data)
POLLUTANT CONCENTRATION IN MG/L FOR LAND USE
Pollutant  Load in pounds Concentration (mg/l)
TSS 0.803884 lbs. 60
TP 0.004019 lbs. 0.3
TN 0.020097 lbs. 1.5
Zn 0.000938 lbs. 0.07
TPH 0.026796 lbs. 2
POLLUTANT RENOVATION ANALYSIS
TREATMENT SYSTEM #1 Deep Sump Catch Basin (48" w/hooded outlet) (See Sheet 3 for data)
Pollutant  Load Removal Load Load Total Removal
Rate Removed Remaining Percentage
TSS 0.8038841 0.09 0.07235 0.731535 9%
TP 0.0040194 0 0 0.004019 0%
TN 0.0200971 0 0 0.020097 0%
Zn 0.0009379 0.05 4.69E-05 0.000891 5%
TPH 0.0267961 0.14 0.003751 0.023045 14%
TREATMENT SYSTEM #2 Cultec/Stormtech Isolator Row (See sheet 3 for data)
Pollutant  Load Removal Adjustment Load Load Total Removal
Rate Factor ** Removed Remaining Percentage
TSS 0.7315345 0.8 1 0.585228 0.146307 82%
TP 0.0040194 0.3 1 0.001206 0.002814  30%
TN 0.0200971 0 1 0 0.020097 0%
Zn 0.000891 0.55 1 0.00049 0.000401 57%
TPH 0.0230447 0.92 1 0.021201 0.001844 93%
TREATMENT SYSTEM #3 Infiltration Chambers (See sheet 3 for data)
Pollutant  Load Removal Adjustment Load Load Total Removal
Rate Factor ** Removed Remaining Percentage
TSS 0.1463069 0.75 0.1 0.010973 0.135334 83%
TP 0.0028136 0.33 0.55 0.000511 0.002303 43%
TN 0.0200971 0.19 0.8 0.003055 0.017042 15%
Zn 0.0004009 0.86 0.25 8.62E-05 0.000315 66%
TPH 0.0018436 0.9 0.1 0.000166 0.001678 94%

Page 23

3 
 
 
Figure 2 - Pollutant Concentrations per land use 
POLLUTANT CONCENTRATION PER LAND COVER TYPE
LAND COVER TYPE TSS TP TN Zn TPH
Large Lot Residential (1 unit/5-10 acres) 60 0.3 1.5 0.07 2
Low Density Residential (1 or 2 units/acre) 60 0.3 1.5 0.07 2
Medium Density Residential (2-8 units per acre) 60 0.3 1.5 0.07 2
High Density Residential (8+ units/acre) 60 0.3 1.5 0.07 2
Commercial (Retail, Office, Restaurants) 55 0.21 1.2 0.13 2
Industrial 74 0.21 1.2 0.13 2
Institutional (schools, churches) 55 0.27 2 0.07 3
Open Urban Lane 50 0.25 1.3 0 0
Transportation (Highways only) 74 0.21 1.5 0.13 5
Earth Excavation (Mining) 350 0.5 1.5 0 0
Animal Feeding Operations 145 0.38 2.2 0 0
Agriculture (Breeding & Training Facilities) 145 0.38 2.2 0 0
Deciduous Forest 55 0.137 0.6 0 0
Evergreen Forest 55 0.137 0.6 0 0
Mixed Forest 55 0.137 0.6 0 0
Brush 55 0.137 0.6 0 0
Wetlands 0 0.38 1.5 0 0
Row & Garden Crops 357 1 2.92 0 0
Cropland 357 1 2.92 0 0
Orchards/Vineyards/Horticulture 357 1 2.92 0 0
Pasture Lands 145 0.38 2.2 0 0
Beaches 0 0.1 1.5 0 0
Bare Ground 100 0.38 1.5 0 0
None 0 0 0 0 0

Page 24

4 
 
 
Figure 3 - Pollutant Removal Rates per Practice 
4. The above analysis shows that the CT DEEP pollutant load reductions will not be met 
assuming that there is particulate matter which will encourage other pollutants to bind to 
silt and clay particles. 
a. TSS = 83% (90% required) 
b. TP = 43% (60% required) 
c. TN = 15% (40% required) 
5. If no particulate matter (sand) is applied to the site, then the other non-point source 
pollutants, such as metals and hydrocarbons in addition to nitrogen and phosphorous will 
stay in soluble form.  Soluble pollutants will not be removed by the proposed stormwater 
treatment system.   A description of the impacts on aquatic systems as a result of 
increased pollutant loads is found in Appendix “A” of this report. 
POLLUTANT REMOVAL RATES FOR STORMWATER MANAGEMENT SYSTEMS
STANDALONE RATES POLLUTANT REMOVAL RATES (PERCENT)
SYSTEM TYPE TSS TP TN Zn TPH
Bioretention (No underdrain) 83 34 12 67 65
Bioretention (Internal Water Storage) 83 34 75 67 65
Bioretention (WTR or Iron Filings) 83 80 12 67 65
Tree Filter 91 15 1 75 99
Surface Sand Filter 51 33 5 77 99
Dry Swale w/filter berms 58 50 65 40 82
Infiltration Trenches 75 33 19 86 90
Infiltration Chambers 75 33 19 86 90
Infiltration Basin 80 35 21 88 90
Cultec/Stormtech Isolator Row 80 50 0 55 92
Permeable Asphalt Pavement 99 60 0 75 99
Porous Concrete Pavement 97 0 0 99 99
Permeable Interlocking Pavers 99 99 99 99 99
Extended Detention Shallow Wetlands 69 51 27 62 72
Subsurface Gravel Wetland 99 58 98 99 99
Pond/Wetland System 65 51 27 58 81
Micro-pool Extended Detention Pond 65 51 27 58 81
Wet Pond/Pocket Pond 65 51 27 58 81
Shallow Wetlands 65 28 18 58 81
Wet Extended Detention Pond 65 51 27 58 81
Multiple Pond System 65 51 27 58 81
Wet Swale 75 20 40 38 65
Dry Detention Pond 30 10 2 30 38
Vegetated Filter Strip 52 10 13 67 45
Standard Catch Basin (24" sump) 5 0 0 2 7
Deep Sump Catch Basin (48" w/hooded outlet) 9 0 0 5 14
On-line Hydrodynamic Separator 29 0 0 21 42
Off-line Hydrodynamic Separator 75 0 0 26 64
LISD Urban Planter 63 22 34 65 65
LISD Curb Extension 63 22 34 65 62
ADS Water Quality Unit 68 0 0 64 58
ADS Detention/Infiltration Unit 99 0 0 99 99
Riprap Swale 52 0 0 65 32
Jellyfish Filter (online) 45 18 11 24 64
Jellyfish Filter (offline) 80 50 30 30 80
None 0 0 0 0 0

Page 25

5 
 
6. The applicant claims that since they are containing the water quality volume in the 
multiple stormwater systems, the pollutant loads are magically reduced as the following 
language from the CT DEEP 2024 Storm Water Quality Manual seems to imply:  
“Achieving these minimum required load reductions for sediment and nutrients is 
assumed to provide adequate reductions of other stormwater pollutants including 
floatable materials. However, it is important to note that if the full retention goal (i.e., 
Required Retention Volume) is met, then it is assumed pollutant reduction is also 
achieved and individual pollutant calculations are not necessary.”  
7. The above statement is not supported by science for the following reasons:  Assumed is 
not an engineering term.   No evidence is found in the 2024 Manual to support the 
above statement. 
a. Treatment Processes: Effective removal relies on specific physical, chemical, and 
biological processes occurring within the practice, such as sedimentation, 
filtration, adsorption, and microbial action. Holding the water simply provides the 
opportunity for these processes to work. 
b. Design and Maintenance: The specific design of the practice (e.g., detention pond, 
rain garden, permeable pavement) and its ongoing maintenance are vital for 
ensuring these processes function correctly. Clogged systems or short-circuiting 
flow paths can drastically reduce efficiency, even if the total volume is captured. 
c. Pollutant Characteristics: Different pollutants behave differently. Suspended 
solids often settle out well, while dissolved nutrients (like nitrogen and 
phosphorus) or certain chemicals might require specialized treatment components 
or longer retention times for effective removal. 
d. Storm Dynamics: The WQV is typically designed for a specific "design storm" 
(e.g., the first flush or a 90% storm event) [1]. Larger or more intense storms may 
overwhelm the system, resulting in bypass or reduced treatment efficiency for the 
excess volume.  
e. Many stormwater practices found in the 2024 CT DEEP Storm Water Quality 
Manual are incapable of providing the high level of reduction required.   As an 
example, a Dry Detention Basin is rated by CT DEEP to have Moderate TSS 
removal and low TP and TP removal, so it does not matter how much water is 
held in a Dry Detention Basin, the required pollutant load reductions will never be 
met as the system cannot provide them. 
8. Because of the extremely fast permeability rates in the underground stormwater system, a 
pollutant loading analysis must be done to demonstrate that non-point source pollutants 
will be reduced prior to introduction to the underground stormwater system as no 
additional will occur in the coarse sandy soils.   
Please contact my office if you have any questions concerning this information. 
 
     Respectfully submitted, 
     Trinkaus Engineering, LLC 
      
     Steven D. Trinkaus, PE 
 

Page 26

6 
 
APPENDIX “A” 
DISCUSSION OF ADVERSE ENVIRONMENTAL IMPACTS FROM 
INCREASED DISCHARGES OF NON-POINT SOURCE POLLUTANTS 
 
Litter and Trash 
 Litter and trash will not directly cause a toxic impact on the environment; the presence 
of litter is an aesthetic issue that is not well received by the public.  Additionally, litter and trash 
can become a food source for rats and other undesirable animals which can potentially cause 
public health issues. 
 
 
Figure 5.1.1 - Trash along a waterbody (Norwegian SciTech News) 
 
Total Suspended Solids (TSS) 
 Total Suspended Solids are fine soil particles, such as silts and clay which are dissolved in 
water.   In excessive amounts it causes turbidity in water.  The turbidity blocks light in the water 
column, which causes reduced photosynthesis, which in turn reduces the oxygen levels in the 
water.   Coarse and fine sediments can clog the gravel substrate in breeding streams thus 
affecting the biological community’s ability to reproduce.  Common sources of TSS and 
sediment are runoff from construction sites, winter sanding operations, airborne dust via 
atmospheric deposition and decomposition of organic matter, such as leaves.  Turbidity is 
measured as nephelometric turbidity units (NTU).   A range of turbidity levels are shown in 
Figure 5.1.2 below.   
 

Page 27

7 
 
 
Figure 5.1.2 - Range of turbidity in water samples 
 
Nutrients 
 Phosphorus and nitrogen are commonly found in non-point runoff with the primary 
source being lawn fertilizers.  A secondary, but more important source of phosphorous and 
nitrogen is atmospheric deposition on impervious surfaces.   It is well documented in 
professional literature that atmospheric deposition of nitrogen and phosphorous is a 
substantial amount of nutrients in post-development runoff.  Atmospheric deposition is 
responsible for 55% of the total nitrogen, 15% of total phosphorous in post-development 
runoff.   
Excessive levels of phosphorus in freshwater systems are a concern as this increased 
phosphorus, both as particulate and soluble forms are responsible for excess growth of non-
native aquatic plants and algae in lakes.   As a result of increased nutrient loads, toxic algae 
blooms are becoming more prevalent in lakes in Connecticut.   These toxic algae blooms have 
resulted in beach closures as exposure to the algae blooms can cause adverse health issues in 
humans.   
A further problem occurs when the non-native plants die in the water.  The 
decomposition process of organic matter removes oxygen from the water column, thus 
reducing oxygen levels in the water.   The reduced oxygen levels in the waterbody can result in 
fish dying.    
Nitrogen, in its many forms, is a direct human health hazard and an indirect hazard in 
some areas where it leads to the release of arsenic from sediments.  While not a major concern 
for freshwater systems, nitrate can cause environmental impacts in tidal regions, even though 
the source of nitrate can be far away from coastal regions.  Sources of nutrients are organic and 
inorganic fertilizers, animal manure, biosolids and failing sewage disposal systems which result 
in a surface discharge of effluent. 
 

Page 28

8 
 
 
Figure 5.1.3 - Phosphorus impacts on a freshwater pond 
 
Figure 5.1.4 - Impacts of dissolved inorganic nitrogen (www.yourgreenpal.com) 
 

Page 29

9 
 
 
Figure 5.1.5 - Impacts of nitrogen and phosphorus on aquatic systems 
 
Metals 
 Metals in non-point source runoff are very toxic to aquatic life at low concentrations.  
The adverse effects of metals are significant for both aquatic and human health.  Many metals 
can bioaccumulate in the environment, which can affect higher living organisms, such as 
humans.  This condition occurred with mercury in tuna fish in the ocean years ago.  While the 
concentration of zinc or copper in stormwater generally is not high enough to bother humans, 
these same concentrations can be deadly for benthic aquatic organisms.  Many microorganisms 
in soil are especially sensitive to low concentrations of cadmium.  Zinc, Copper, and Cadmium 
found in non-point source runoff result from the movement and wear and tear of automobiles 
on our roadways.  The primary sources of metals are from vehicle brake pads and tires.  
Components of homebuilding such as metal roofs, gutters and downspouts can also be sources 
of metals in stormwater. 
 Of the above discussed metals, zinc and copper are the two metals which are found 
dominantly in non-point source runoff.  Metals commonly bind themselves to sediment and 
organic matter in stormwater and thus are transported to the receiving waters.   

Page 30

10 
 
 
Figure 5.1.6 - Primary source of zinc (automobile brake pads) 
Hydrocarbons 
 Total Petroleum Hydrocarbons (TPH) are highly toxic in the aquatic environment, 
especially to aquatic invertebrates.  The primary sources of petroleum hydrocarbons are oil, 
grease drops from an automobile, gas spills, and vehicle exhaust.  Polycyclic Aromatic 
Hydrocarbons (PAHs) are also toxic to aquatic life.   PAHs can be discharged into the 
environment by using coal tar asphalt sealants, commonly used by homeowners on residential 
driveways.  The movement of vehicles or people walking over the sealed driveway can release 
dust particles containing PAH, which can then be washed off with the next rainfall into the 
stormwater management system.   PAHs are also generated by the burning of fossil fuels, and 
the airborne particles are then deposited by atmospheric deposition on an impervious surface, 
especially large flat roof areas.  When it rains, the accumulations of PAHs due to atmospheric 
deposition are carried off in the stormwater. 
 
 
 
    Figure 5.1.7 - Petroleum Hydrocarbons in Stormwater 
 
 

Page 31

11 
 
 
De-icing Agents 
 In the past fifteen years, it has been common for states and municipalities to use deicing 
agents on roads prior to a snowfall event to prevent the snow from sticking to the road surface.   
These de-icing agents are applied in a liquid form called brine.   The brines can consist of 
Sodium Chloride, Calcium Chloride, Magnesium Chloride and Potassium Chloride.  Sodium 
Chloride is the most common deicing agent due to its availability and low cost.  According to 
the University of Minnesota Extension Group deicing agents will cause the following adverse 
environmental impacts: 
 
1. Water Quality 
a. One teaspoon of salt will pollute 5 gallons of water. 
b. Deicing agents will pollute the groundwater. 
c. Chloride in high amounts affects the oxygen levels and natural mixing 
of lakes and waterways and is toxic to fish, aquatic bugs and 
amphibians. 
d. Excessive use of de-icing agents can degrade concrete, asphalt, and 
natural stone, and will corrode metals. 
2. Plants and Soils 
a. Dried up brown needles and leaves. 
b. Loss of foliage, buds, and branches. 
c. Premature plant death. 
d. Sodium causes clay particles in soil to expand, increasing soil 
compaction, reducing water infiltration and making it harder for roots 
to grow. 
e. High salinity can cause root damage and dehydration in many turfgrass 
species which result in yellowing death. 
 
Figure 5.1.8 - Application of deicing agents on road ( www.harmonydeicing.com) 
 

Page 32

12 
 
 
 
Thermal Impacts 
Impervious surfaces, such as roofs and paved areas, such as residential driveways can 
heat up during sunny days and hold onto this heat.   When rainfall occurs on these heated 
surfaces, the resulting runoff will have a highly elevated temperature resulting from the heat 
transference from the impervious surface to the runoff.  As this heated runoff is discharged into 
receiving water, the temperature of the receiving water is raised to a level which can exceed 
the temperature tolerance limits for fish and invertebrates, thus lowering their survival rates.   
Elevated water temperatures will also contribute to reduced oxygen levels in the water.   While 
temporary spikes in temperature in cold water stream may not have an adverse impact on fish 
species, frequent or prolonged spikes in water temperature will have adverse impacts on fish 
species. 
 
 
Figure 5.1.9 - Fish kills due to increased thermal levels 
 
Pathogens 
 Pathogens are bacteria and viruses, which can cause disease in humans.   Most 
pathogens are found in discharges from overflowing sanitary sewers or in combined 
sanitary/stormwater systems which is not applicable to the Town of Stonington.   In 
communities such as Stonington, the primary source of pathogens in stormwater is pet waste 
which is not picked up by dog walkers along roadways.  Dog poop which washes into a storm 
drain are the common source of both fecal coliform and enterococci bacteria which are used as 
indicators for the presence of pathogenic organisms, yet their presence does not mean a 
pathogen is present, just that there is a higher risk of being present. 
 

Page 33

13 
 
 
Figure 5.1.10 - Primary source of pathogens in stormwater 
 
 
 
 

Page 34

TOWN OF GRANBY 
Incorporated 1786 
15 North Granby Road 
Granby, Connecticut 06035-2102 
 
1 
October 14, 2026 
 
 
 
Forrest Devine 
129 Lovers Lane 
Granville, MA 01034 
 
RE: 37 Hartford Avenue – F. Devine – Permit application for regulated activities in connection with the 
development of a 16-unit apartment building and associated site improvements. 
 
Dear Mr. Devine: 
 
Please be advised that on October 14, 2026, the Inland Wetlands and Watercourses Commission 
(IWWC) Agent approved the subject application in accordance with the application and supporting 
documentation received to date.  
 
The following are the conditions of this approval.  
 
1. Notification Requirements 
a. The Office of Community Development shall be notified at least 48 hours prior to the start of any 
activities. 
b. When barrier erosion controls have been installed prior to earth disturbance activities. 
c. When invasive species have been removed. 
d. When plantings have been installed. 
e. Upon completion of project activities. 
f. Prior to the removal of erosion controls 
 
2. Municipal Inspection 
a. Town staff shall inspect installed erosion controls prior to the start of work that results in earth 
disturbance activities, this includes, but is not limited to, grubbing and stump removal. 
b. Standard inspections of the approved improvements shall be made throughout active 
construction and upon final stabilization of exposed soils to ensure regulatory compliance and 
protection of wetland resource areas. 
c. A site inspection shall be completed to witness that invasive species have been adequately 
removed, please refer to sheet D-6 “Compliance Notes” revised to 8/25/26 for additional invasive 
species control details.  
d. A site inspection shall be completed to document successful installation and survivability of 
proposed plantings.  
 
3. Prior to the start of work, the applicant shall submit a bond in the amount of $5,000 to the Town of 
Granby for payments made to the Town Wetlands Officer for monitoring the development for 
compliance with this approval. Should the costs exceed this amount the applicant will be billed for the 
difference. Any funds not used for the project will be remitted to the applicant at the conclusion of the 
project. As used in this condition, the term Town Wetlands Officer includes any person or firm 
designated by the Director of Community Development for the purposes of monitoring the 
development activities to assure compliance with this approval and the IWWC Regulations. 
 
4. A Mylar copy of the approved plans signed by the IWWC Chair shall be filed on the Land Records in 
the Office of the Town Clerk, prior to the issuance of a building permit.  
 

Page 35

37 Hartford Avenue – Apartments  
9/9/26 Approval Letter 
 2  
5. All work shall be in conformance with the approval and application materials as submitted for this 
Permit Approval. Any modifications to the approved plans must be reviewed and approved by the 
Granby Inland Wetlands and Watercourses Commission or their designated Agent.  
 
6. Erosion controls shall be maintained until the site has achieved permanent stabilization. Permanent 
stabilization is defined as 70% permanent vegetation covering over 90% of the area. A stockpile of 
erosion controls shall remain on site to prepare controls as necessary. The IWWC shall be notified in 
writing at least 48 hours in advance of erosion controls being removed.  
 
7. Excavated soil shall not be brought off property without the notification and approval of the Office of 
Community Development. The applicant shall supply the destination in writing for any excavated soil 
removed from the property.  
 
8. Only clean fill, free of invasive species, shall be brought on-site. Utilizing on-site fill will reduce, if not 
eliminate the potential for the introduction and potential colonization of new invasive species into this 
area of the watershed.   
 
9. A Mylar copy of the final As-Built Drawing, depicting the approved wetland boundary and limit of 
vegetative clearing; shall be filed on the Land Records in the Office of the Town Clerk, prior to the 
issuance of a Certificate of Occupancy. 
 
10. This permit is valid for a period of 5 years from the date of issuance. 
 
If you have any questions, please call the Office of Community Development at your earliest convenience. 
 
Sincerely, 
 
 
 
John Laudati 
Granby IWWC Chairman 
 

Page 36

Page 37

Page 38

Page 39

Page 40

 
   
 

Page 41

  
 

Page 42

    
 

Page 43

   
 
   
 

Page 44

 
 
 

Page 45

  
 

Page 46

Page 47

1 
199 Barn Door Hills Road, Granby, CT – Project Description 
 
 In support of the “Application for Inland Wetlands & Watercourses Activity” filed with the 
Town of Granby’s Office of Community Development, Inland Wetlands and Watercourses 
Commission, on October 5, 2026, by Joseph Lambert, Lambert’s Lawn Care (“Lambert”), Lambert 
submits the following brief description of the project under review: 
 
 The property located at and known as 199 Bard Door Hills Road in Granby, Connecticut 
(“Property”), is a residential property bordering Kettle Pond Lane and Barn Door Hills Road that 
contains a culvert intended to allow water to flow into a small pond located on the Property. 
However, the growth of various invasive species of plant life has significantly obstructed the flow 
of water into this pond, resulting in the pond suffering from chronic and abnormally low water 
levels. These conditions have been compounded by the accumulation of “muck” and sediment in 
the pond, as well as erosion of the pond’s borders (which have been caused, at least in part, by the 
invasive plants growing in and around the pond).  
 
 Lambert’s proposed project for the Property is intended to restore the Property’s pond to 
its proper condition and to otherwise establish systems to maintain this condition in the future. 
This will include clearing out all obstructions limiting the flow of water from the culvert to the 
pond, removing all invasive plant life that has grown in and around the pond, adding rock 
formations and silt fencing to stabilize the borders of the pond, applying all-natural “Muckout” to 
the pond to introduce healthy bacteria and enzyme to the pond’s biome in order to improve 
conditions for frogs, fish, and other natural wildlife, and adding a small fountain to aerate and 
oxygenate the water, among other related work. 
 
 This project will also include other work to improve the overall condition of the Property, 
including the removal of dead and/or diseased trees that present a hazard to the home on the 
Property and the surrounding roadways, clearing other sections of the Property of invasive plant 
life, removing other small structures on the Property (such as a small, raised garden bed), and 
remediating garden beds located throughout the Property. 
 
  For further information on the precise nature of the project and the work to be performed 
at the Property, please see the description of work to be performed at each location on the Property 
and the photographs attached to this project description below: 
 
 

Page 48

2 
Further Description of Project & Locations of Work 
 
1.) Southwest corner of property: Clear all invasive growth obstructing water flow to culvert. 
Refresh existing stone to prevent regrowth.  
 
2.)  West side of property - slighting into north side of property: Clear all invasive growth. Lightly 
top-dress with soil and plant grass. This will allow these areas to be mowed and maintained to 
prevent invasive regrowth. Current pond water levels are low even after large volumes of rain. 
This overgrowth is preventing water from reaching the pond.  
 
3.) Northeast corner of property: Clear invasive growth. Vines are climbing and killing trees close 
to Barndoor Hills Road. Plant grass to prevent invasive regrowth. Install small perennial flower 
garden to beautify street.  
 
4.) Around house: Cleanout all existing garden beds and add new mulch.  
 
5.) Front of house: Remove 1x hazardous/dead Ash tree.  
 
6.) South side of property by Kettle Pond Ln: Remove all dead plum trees killed by black knot 
disease. Add low level perennial garden to beautify street. Road visibility should Increase.  
 
7.) Corner of driveway: Existing patio to be power washed and joints to be resealed. General 
rehabilitation.  
 
8.) Existing Pond: Goal is to enhance aquatic wildlife habitat, maintain aquatic plants & encourage 
water to flow into pond. Current pond conditions are poor as water levels are lowering even with 
large amounts of rainwater. 
 
• Clear all invasive growth around the borders of pond - Water has been obstructed by 
invasive overgrowth. 
• We would add boulders to stabilize banks of pond (some boulders are already here). 
• Install drainage behind boulders with stone to encourage water to access pond.  
• Potentially run a water line from well with (float & back flow preventor) to add clean water 
to pond when levels are too low.  
• Add "Muckout" to existing pond adding natural bacteria & Enzymes to pond reducing 
muck and encouraging healthier environment for frogs / fish & aquatic life. ALL Natural.  
• Add fountain to center of pond to aerate and oxygenate water.  
• Add silt fence around outside border of pond. Seed around exterior of pond with straw 
erosion matting to prevent movement into pond.  
 
 

Page 49

3 
Photographs of Preexisting Condition of the Property
 

Page 50

4 
 

Page 51

5 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Page 52

6 
Photographs of Property & Description of Work 
 
 

Page 53

7 
 

Page 54

8 
 
 

Page 55

9 
 
 

Page 56

10 
 
 

Page 57

11 
 
 
 
 

Page 58

12 
 
 
 
 

Page 59

13 

Page 60

14 
 
 
 
 
 
 
 
 

Page 61

15 
 
 
 
 

Page 62

16 
 

Page 63

17 
 
 

Page 64

18 

Page 65

19 
 
 

Page 66

20 
  

Page 67

21 
 

Page 68

22 
 
 

Page 69

23 
 
 

Page 70

24 
 
 

Page 71

25 
 
 
 
 

Page 72

26 
 
 

Page 73

27 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Page 74

28 
Artistic Rendering of Pond after Project Completion 
 
 
 
 
 

Page 75

29 
Product Used to Restore Pond Biome 
 
 
 
 

Page 76

Page 77

Page 78

Page 79

Page 80

TOWN OF GRANBY 
Incorporated 1786 
15 North Granby Road 
Granby, Connecticut 06035-2102 
 
October 14, 2026 
 
 
Town of Granby 
15 North Granby Road 
Granby, CT 06035 
 
RE: 53 West Granby Road and 215 Salmon Brook Street – Town of Granby – Permit application to 
construct a walking path and associated improvements within a regulated area. 
 
Dear Town of Granby: 
 
Please be advised that on October 14, 2026, the Inland Wetlands and Watercourses Commission (IWWC) 
approved the subject application in accordance with the application and supporting documentation received to 
date. 
 
The following are the conditions of this approval.  
 
1. The Office of Community Development shall be notified at least 48 hours prior to the start of any 
construction activities. 
 
2. Town staff shall inspect installed erosion controls prior to the start of any work that results in earth 
disturbance activities, this includes, but is not limited to, grubbing and stump removal.  
 
3. All work shall be in conformance with this approval and application materials as submitted for this 
Permit Approval. Any modifications to the approved plans must be reviewed and approved by the 
Granby Inland Wetlands and Watercourses Commission or their designated Agent. 
 
4. No materials may be deposited outside of the work area on the project site, without written approval 
from the IWWC or their designated Agent. 
 
5. Erosion controls shall be maintained until the site has achieved permanent stabilization. Permanent 
stabilization is defined as 70% permanent vegetation covering over 90% of the area. A stockpile of 
erosion controls shall remain on site to be installed, as necessary. The IWWC shall be notified in 
writing at least 48 hours in advance of erosion controls being removed. 
 
6. Excavated soils shall not be brought off-property without the notification and approval of the Office of 
Community Development. The applicant shall supply the destination in writing for any excavated soil 
to be removed from the property. 
 
7. This permit is valid for a period of 5-years from the date of issuance. 
 
8. Upon completion of construction and site stabilization, the IWWC shall be notified in writing that work 
is complete, and a final inspection may be completed at that time. 
 
If you have any questions, please call the Office of Community Development at your earliest convenience. 
 
Sincerely, 
 
 
 
John Laudati 
Granby IWWC Chairman 

Page 81

Location Map
Scale:  1"=500'
TOWN OF GRANBY
SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING
215 Salmon Brook Street
Granby, Connecticut
Date: September 3, 2026
Revised: October 6, 2026
INLAND WETLANDS PERMIT SET
Owner:
Town of Granby
15 North Granby Road
Granby, Connecticut 06035
Civil Engineer:
Kevin Clark, PEL
Town Engineer
15 North Granby Road
Granby, Connecticut 06035
(860) 844-5318
townengineer@granby-ct.gov
Surveyor:
BSC Group
665 Winding Brook Drive
Glastonbury, Connecticut 06033
  (860) 652-8227 List of Drawings:
  -
Sheet OA-1
Sheet C-1 to C-4
Sheet DE-1 to DE-3
Cover
Overall Plan
Plan
Notes & Details
Site

Page 82

N/F
TOWN OF GRANBY
53 West Granby Road
Vol. 94 Pg. 21
map G-42 /block 74 /lot 99
N/F
TOWN OF GRANBY
53 West Granby Road
Vol. 94 Pg. 21
map G-42 /block 74 /lot 99
Approximate Edge of Water
Approximate Edge of Water
Approximate Edge of Water
Approximate Edge of Water
West Branch Salmon Brook
(PUBLIC VARIABLE WIDTH)
WEST GRANBY  ROAD  (S.R. #20)
West Branch Salmon Brook
N/F
Paul D. & Cathy A Biagini
51 West Granby Road
Vol. 353 Pg. 1086
map G-42 /block 74 /lot 98
N/F
Anthony Indino
47 West Granby Road
Vol. 423 Pg. 809
Vol. 420 Pg. 175
map G-42 /block 74 /lot 96
N/F
Thomas Randall Clay
45 West Granby Road
Vol. 221 Pg. 951
Vol. 190 Pg. 789map G-42 /block 74 /lot 95
N/F
William G. & Jonna L  Hallam
49 West Granby Road
Vol. 371 Pg. 1211
Vol. 349 Pg. 208
map G-42 /block 74 /lot 97
N/F
TOWN OF GRANBY
215 Salmon Brook Street
Vol. 74 Pg. 176
map H-42 /block 74 /lot 87
101
38E
29A
38C
29A
38E
38C
100
101
Approximate Edge of Water
Approximate Edge of WaterWest Branch Salmon Brook
EXIST. SOIL LINE
EXIST. PROP. LINE
INLAND WETLANDS REGULATED AREA
MATCH
MARK
MATCH
MARK
MATCH
MARK
MATCH
MARK
MATCH
MARK
MATCH
MARK
AREA 1
AREA 1
AREA 2
AREA 3
AREA 5
AREA 4
GRANBY TOWN HALL
15 NORTH GRANBY ROAD
GRANBY, CONNECTICUT 06035
PHONE: (860) 844-5318     FAX:  (860) 844-5325
TOWN OF GRANBY
ENGINEERING DEPARTMENT
SCALE:DATE:JOB #:SHEET:
 1"=100'SEPTEMBER 3, 2026 2025.G01OA-1
OVERALL PLAN
TOWN OF GRANBY
SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING
215 SALMON BROOK STREET
GRANBY, CONNECTICUT
NO.DATEDESCRIPTION
REVISIONS
SHEET C-1 SHEET C-2
SHEET C-3
SHEET C-4
UTILITY WARNING
The locations of existing underground utilities are shown in an approximate way only and have not been independently
verified by the Owner or its representative.  Utilities not shown on this plan may exist. The Contractor shall determine the
exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages
which might be occasioned by the Contractor's failure to exactly locate and preserve any and all underground utilities.
The Contractor shall use CALL BEFORE YOU DIG, 811, https://www.cbyd.com/, prior to any construction activity.

Page 83

100
101
PROP. 5-FT WIDE HMA WALK
SIDEWALK BASE LINE 10
0+0184.96
2+00G.B. 185.41
3+00G.B. 186.08
4+00G.B. 187.17
EXIST. SIDEWALK
PROP. PARK BENCHW/CONC. SLAB
APPROX. GRADING LIMIT
WALKCROSSSLOPE
MATCH
MARK
MATCH
MARK
PROP. CONC.SIDEWALK RAMP5-FT LONG
0+05 END CONC. RAMPEL=185.06
0+50G.B. 184.95
C 9
L 30
L 31
C 10
L 32
C 11
L 33
SF
SF
SF
SF
SF
SF
SF
PROP. SOIL STOCKPILE AREA
SF
SF
SF
SF
SF
SF
SF
C.E.
SEDIMENT & EROSION CONTROL MEASURES
MEASUREPLAN KEY
CONSTRUCTION ENTRANCECE
DUST CONTROLDC
EROSION CONTROL MATTINGECM
GEOTEXTILE SILT FENCEGSF
HAY BALE BARRIERHB
INLET PROTECTIONIP
LAND GRADINGLG
LANDSCAPE MULCHLM
LANDSCAPE PLANTINGLP
MULCH FOR SEEDMS
OUTLET PROTECTIONOP
PERMANENT LINED WATERWAYPW
PERMANENT SEEDINGPS
PERMANENT TURF REINFORCEMENT MAT TRM
RIP RAPRR
SEDIMENT CONTROL LOGSCL
STONE CHECK DAMSCD
STONE SLOPE PROTECTIONSSP
SURFACE ROUGHENINGSR
TOPSOILINGTO
LIST OF ABBREVIATIONS:
BIT. CONC. BITUMINOUS CONCRETE
C.B.CATCH BASIN
CONC.CONCRETE
C.P.E.P.-SCORRUGATED POLYETHYLENE PIPE,
W/SMOOTH INTERIOR
EXIST.EXISTING
G.BGRADE BREAK
INV.     INVERT
L.F.LINEAR FEET
M.H.MANHOLE
PVMT.PAVEMENT
P.V.P.POLYVINYL CHLORIDE
PROP.PROPOSED
TYP.TYPICAL
LEGEND
UTILITY POLE
WETLANDS
BUILDING SETBACK LINE
PROPERTY LINE
PROPOSED
SPOT GRADE
CATCH BASIN
MANHOLE
EASEMENT
CONTOUR
STORM SEWER
CURB
SFSFSFSILT FENCE
PROPOSED
TYPICAL
EXISTING
TYP.PROP.
UPLAND REVIEW AREA
SLSLSEDIMENT CONTROL LOG
SOIL BOUNDARY & TYPE
EXIST. TREE TO BE REMOVED
43B
CONTRACT LIMIT LINE
4+80G.B. 229.4
GRANBY TOWN HALL
15 NORTH GRANBY ROAD
GRANBY, CONNECTICUT 06035
PHONE: (860) 844-5318     FAX:  (860) 844-5325
TOWN OF GRANBY
ENGINEERING DEPARTMENT
SCALE:DATE:JOB #:SHEET:
 1"=20'SEPTEMBER 3, 2026 2025.G01C-1
PLAN
TOWN OF GRANBY
SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING
215 SALMON BROOK STREET
GRANBY, CONNECTICUT
NO.DATEDESCRIPTION
REVISIONS
UTILITY WARNING
The locations of existing underground utilities are shown in an approximate way only and have not been independently
verified by the Owner or its representative.  Utilities not shown on this plan may exist. The Contractor shall determine the
exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages
which might be occasioned by the Contractor's failure to exactly locate and preserve any and all underground utilities.
The Contractor shall use CALL BEFORE YOU DIG, 811, https://www.cbyd.com/, prior to any construction activity.

Page 84

Approximate Edge of Water
Approximate Edge of Water
West Branch Salmon Brook
N/F
TOWN OF GRANBY
215 Salmon Brook Street
Vol. 74 Pg. 176
map H-42 /block 74 /lot 87
DEMO EXIST. TREE (TYP.)
PROP. 5-FT WIDE HMA WALK
SIDEWALK BASE LINE 10
DEMO EXIST. TREE (TYP.)
4+00G.B. 187.17
5+00G.B. 188.19
5+50G.B. 188.15
6+00G.B. 188.59
6+70G.B. 190.28
8+50G.B. 189.71
PROP. PARK BENCHW/CONC. SLAB INLAND WETLANDS REGULATED AREA
APPROX. GRADING LIMIT
WALKCROSSSLOPE
MATCH
MARK
MATCH
MARK
MATCH
MARK
MATCH
MARK
C 11
L 33
C 12
L 34
L 35
C 13
L 36
AREA 1
AREA 2
AREA 3
AREA 5
AREA 4
PROP. WETLANDSMITIGATION AREA (TYP.)AREA 6
SEDIMENT & EROSION CONTROL MEASURES
MEASUREPLAN KEY
CONSTRUCTION ENTRANCECE
DUST CONTROLDC
EROSION CONTROL MATTINGECM
GEOTEXTILE SILT FENCEGSF
HAY BALE BARRIERHB
INLET PROTECTIONIP
LAND GRADINGLG
LANDSCAPE MULCHLM
LANDSCAPE PLANTINGLP
MULCH FOR SEEDMS
OUTLET PROTECTIONOP
PERMANENT LINED WATERWAYPW
PERMANENT SEEDINGPS
PERMANENT TURF REINFORCEMENT MAT TRM
RIP RAPRR
SEDIMENT CONTROL LOGSCL
STONE CHECK DAMSCD
STONE SLOPE PROTECTIONSSP
SURFACE ROUGHENINGSR
TOPSOILINGTO
LIST OF ABBREVIATIONS:
BIT. CONC. BITUMINOUS CONCRETE
C.B.CATCH BASIN
CONC.CONCRETE
C.P.E.P.-SCORRUGATED POLYETHYLENE PIPE,
W/SMOOTH INTERIOR
EXIST.EXISTING
G.BGRADE BREAK
INV.     INVERT
L.F.LINEAR FEET
M.H.MANHOLE
PVMT.PAVEMENT
P.V.P.POLYVINYL CHLORIDE
PROP.PROPOSED
TYP.TYPICAL
LEGEND
UTILITY POLE
WETLANDS
BUILDING SETBACK LINE
PROPERTY LINE
PROPOSED
SPOT GRADE
CATCH BASIN
MANHOLE
EASEMENT
CONTOUR
STORM SEWER
CURB
GSFGSFGSFSILT FENCE
PROPOSED
TYPICAL
EXISTING
TYP.PROP.
UPLAND REVIEW AREA
SLSLSEDIMENT CONTROL LOG
SOIL BOUNDARY & TYPE
EXIST. TREE TO BE REMOVED
43B
CONTRACT LIMIT LINE
4+80G.B. 229.4
GRANBY TOWN HALL
15 NORTH GRANBY ROAD
GRANBY, CONNECTICUT 06035
PHONE: (860) 844-5318     FAX:  (860) 844-5325
TOWN OF GRANBY
ENGINEERING DEPARTMENT
SCALE:DATE:JOB #:SHEET:
 1"=20'SEPTEMBER 3, 2026 2025.G01C-2
PLAN
TOWN OF GRANBY
SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING
215 SALMON BROOK STREET
GRANBY, CONNECTICUT
NO.DATEDESCRIPTION
REVISIONS
UTILITY WARNING
The locations of existing underground utilities are shown in an approximate way only and have not been independently
verified by the Owner or its representative.  Utilities not shown on this plan may exist. The Contractor shall determine the
exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages
which might be occasioned by the Contractor's failure to exactly locate and preserve any and all underground utilities.
The Contractor shall use CALL BEFORE YOU DIG, 811, https://www.cbyd.com/, prior to any construction activity.
10/06/26   PER WETLANDS AGENT COMMENTS

Page 85

N/F
TOWN OF GRANBY
53 West Granby Road
Vol. 94 Pg. 21
map G-42 /block 74 /lot 99
101
Approximate Edge of Water
Approximate Edge of WaterWest Branch Salmon Brook
0+00
1+00
PC: 0+69.48
PT: 0+82.32
PROP. 5-FT WIDE HMA WALK
SIDEWALK BASE LINE 10
L 9
C 8
EXIST. PATH TO BE REBUILT TO 6-FT WIDE WOODS TRAIL
SIDEWALK BASE LINE 11
9+50G.B. 190.30
10+50G.B. 190.30
11+50G.B. 189.67
12+20G.B. 190.41
13+00G.B. 190.57
14+00G.B. 190.33
END 15+14190.91
PROP. PARK BENCHW/CONC. SLAB
APPROX. GRADING LIMIT
WALKCROSSSLOPE
MATCH
MARK
MATCH
MARK
APPROX. LOCATION OFPROP. HORSE PATHCLEAR 5-FT WIDE PATH
MATCH
MARK
MATCH
MARK
C 14
L 37
C 15
L 38
PROP. SOIL STOCKPILE AREA
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
AREA 1
SL
PROP. WETLANDSMITIGATION AREA (TYP.)
SEDIMENT & EROSION CONTROL MEASURES
MEASUREPLAN KEY
CONSTRUCTION ENTRANCECE
DUST CONTROLDC
EROSION CONTROL MATTINGECM
GEOTEXTILE SILT FENCEGSF
HAY BALE BARRIERHB
INLET PROTECTIONIP
LAND GRADINGLG
LANDSCAPE MULCHLM
LANDSCAPE PLANTINGLP
MULCH FOR SEEDMS
OUTLET PROTECTIONOP
PERMANENT LINED WATERWAYPW
PERMANENT SEEDINGPS
PERMANENT TURF REINFORCEMENT MAT TRM
RIP RAPRR
SEDIMENT CONTROL LOGSCL
STONE CHECK DAMSCD
STONE SLOPE PROTECTIONSSP
SURFACE ROUGHENINGSR
TOPSOILINGTO
LIST OF ABBREVIATIONS:
BIT. CONC. BITUMINOUS CONCRETE
C.B.CATCH BASIN
CONC.CONCRETE
C.P.E.P.-SCORRUGATED POLYETHYLENE PIPE,
W/SMOOTH INTERIOR
EXIST.EXISTING
G.BGRADE BREAK
INV.     INVERT
L.F.LINEAR FEET
M.H.MANHOLE
PVMT.PAVEMENT
P.V.P.POLYVINYL CHLORIDE
PROP.PROPOSED
TYP.TYPICAL
LEGEND
UTILITY POLE
WETLANDS
BUILDING SETBACK LINE
PROPERTY LINE
PROPOSED
SPOT GRADE
CATCH BASIN
MANHOLE
EASEMENT
CONTOUR
STORM SEWER
CURB
SFSFSFSILT FENCE
PROPOSED
TYPICAL
EXISTING
TYP.PROP.
UPLAND REVIEW AREA
SLSLSEDIMENT CONTROL LOG
SOIL BOUNDARY & TYPE
EXIST. TREE TO BE REMOVED
43B
CONTRACT LIMIT LINE
4+80G.B. 229.4
GRANBY TOWN HALL
15 NORTH GRANBY ROAD
GRANBY, CONNECTICUT 06035
PHONE: (860) 844-5318     FAX:  (860) 844-5325
TOWN OF GRANBY
ENGINEERING DEPARTMENT
SCALE:DATE:JOB #:SHEET:
 1"=20'SEPTEMBER 3, 2026 2025.G01C-3
PLAN
TOWN OF GRANBY
SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING
215 SALMON BROOK STREET
GRANBY, CONNECTICUT
NO.DATEDESCRIPTION
REVISIONS
UTILITY WARNING
The locations of existing underground utilities are shown in an approximate way only and have not been independently
verified by the Owner or its representative.  Utilities not shown on this plan may exist. The Contractor shall determine the
exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages
which might be occasioned by the Contractor's failure to exactly locate and preserve any and all underground utilities.
The Contractor shall use CALL BEFORE YOU DIG, 811, https://www.cbyd.com/, prior to any construction activity.

Page 86

N/F
TOWN OF GRANBY
53 West Granby Road
Vol. 94 Pg. 21
map G-42 /block 74 /lot 99
Approximate Edge of Water
Approximate Edge of Water
EXISTINGRESIDENCE
West Branch Salmon Brook
(PUBLIC VARIABLE WIDTH)
WEST GRANBY  ROAD  (S.R. #20)
38E
29A
38C
6+31
2+00
3+00
4+00
5+00
6+00
PI: 1+28.88
PI: 1+84.69
PI: 2+30.00
PI: 2+46.67
PI: 2+59.16
PI: 2+86.32
PI: 3+01.22
PI: 3+48.62
PI: 3+96.68
PI: 4+31.73
PI: 4+59.63
PI: 4+80.93
PI: 5+07.26
PI: 5+31.68
PI: 5+69.10
PI: 5+96.67
2+30B.S. 196.29
2+41.70T.S. 203.22
2+69.87B.S. 204.38
2+81.57T.S. 211.31
4+98.50G.B. 229.52
L 10
L 11
L 12
L 13
L 14
L 15
L 17
L 18
L 19
L 20
L 21
L 22
L 23
L 24
L 25
L 26
3+29.74B.S. 213.46
3+36.76T.S. 217.87
3+84.93B.S. 220.03
3+91.95T.S. 224.44
L 16
1+30G.B. 191.29
PROP. OVERLAPPING TIMBER STEPS7 RISERS, OVERALL LENGTH =12'
APPROX. GRADING LIMIT
PROP. OVERLAPPING TIMBER STEPS7 RISERS, OVERALL LENGTH = 12'
PROP. OVERLAPPING TIMBER STEPS11 RISERS, OVERALL LENGTH = 16'-8"
PROP. OVERLAPPING TIMBER STEPS11 RISERS, OVERALL LENGTH = 16'-8"
APPROX. LOCATION OF PROP. HORSE PATH.CLEAR 5-FT WIDE PATH AS DIRECTED
MATCH
MARK
MATCH
MARK
GSF
GSF
GSF
GSF
GSF
GSF
ECM (TYP.)
SCL
ADD EDUCATIONAL SIGNAGE
AT TRAILHEAD TO BROOK
ECM (TYP.)
EXIST. PATH TO BE REBUILT TO 6-FT WIDE WOODS TRAIL
SEDIMENT & EROSION CONTROL MEASURES
MEASUREPLAN KEY
CONSTRUCTION ENTRANCECE
DUST CONTROLDC
EROSION CONTROL MATTINGECM
GEOTEXTILE SILT FENCEGSF
HAY BALE BARRIERHB
INLET PROTECTIONIP
LAND GRADINGLG
LANDSCAPE MULCHLM
LANDSCAPE PLANTINGLP
MULCH FOR SEEDMS
OUTLET PROTECTIONOP
PERMANENT LINED WATERWAYPW
PERMANENT SEEDINGPS
PERMANENT TURF REINFORCEMENT MAT TRM
RIP RAPRR
SEDIMENT CONTROL LOGSCL
STONE CHECK DAMSCD
STONE SLOPE PROTECTIONSSP
SURFACE ROUGHENINGSR
TOPSOILINGTO
LIST OF ABBREVIATIONS:
BIT. CONC. BITUMINOUS CONCRETE
C.B.CATCH BASIN
CONC.CONCRETE
C.P.E.P.-SCORRUGATED POLYETHYLENE PIPE,
W/SMOOTH INTERIOR
EXIST.EXISTING
G.BGRADE BREAK
INV.     INVERT
L.F.LINEAR FEET
M.H.MANHOLE
PVMT.PAVEMENT
P.V.P.POLYVINYL CHLORIDE
PROP.PROPOSED
TYP.TYPICAL
LEGEND
UTILITY POLE
WETLANDS
BUILDING SETBACK LINE
PROPERTY LINE
PROPOSED
SPOT GRADE
CATCH BASIN
MANHOLE
EASEMENT
CONTOUR
STORM SEWER
CURB
GSFGSFGSFSILT FENCE
PROPOSED
TYPICAL
EXISTING
TYP.PROP.
UPLAND REVIEW AREA
SLSLSEDIMENT CONTROL LOG
SOIL BOUNDARY & TYPE
EXIST. TREE TO BE REMOVED
43B
CONTRACT LIMIT LINE
4+80G.B. 229.4
GRANBY TOWN HALL
15 NORTH GRANBY ROAD
GRANBY, CONNECTICUT 06035
PHONE: (860) 844-5318     FAX:  (860) 844-5325
TOWN OF GRANBY
ENGINEERING DEPARTMENT
SCALE:DATE:JOB #:SHEET:
 1"=20'SEPTEMBER 3, 2026 2025.G01C-4
PLAN
TOWN OF GRANBY
SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING
215 SALMON BROOK STREET
GRANBY, CONNECTICUT
NO.DATEDESCRIPTION
REVISIONS
UTILITY WARNING
The locations of existing underground utilities are shown in an approximate way only and have not been independently
verified by the Owner or its representative.  Utilities not shown on this plan may exist. The Contractor shall determine the
exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages
which might be occasioned by the Contractor's failure to exactly locate and preserve any and all underground utilities.
The Contractor shall use CALL BEFORE YOU DIG, 811, https://www.cbyd.com/, prior to any construction activity.
10/06/26   PER WETLANDS AGENT COMMENTS

Page 87

SIDEWALK BASELINE
#10 & PORTION OF #11
@ EDGE OF WALK
DIRECTION OF SLOPE AS
NOTED, 1.5% TYP. 2.0% MAX.
(NOT TO SCALE)
BITUMINOUS CONCRETE SIDEWALK DETAIL
2" HMA S0.375(TRAFFIC LEVEL 1)
8" GRANULAR FILL
COMPACTED IN TWO LIFTS
WIDTH = 5'-0"
3" (TYP.)
COMPACTED SUBGRADE
(NOT TO SCALE)
WOODS TRAIL/STONE DUST PATH DETAIL
3" COMPACTED AASHTO
#10 STONE DUST
4" COMPACTED N0. 4
STONE AGGREGATE
WIDTH = 6'-0"
3" (TYP.)
COMPACTED SUBGRADE
PLAN
AA
B
B
2'-0"
8'-0" 3'-0"
6'-1/8"
5'-0"
11'-0"
ATTACH BENCH TO SLAB
W/ 4 - 3/8" x 3-1/2" CONCRETE
EXPANSION ANCHOR BOLTS
1'-0"
2'-0"
SECTION B-B
BENCH
NOTES:
1. BENCH TO BE A EVEREST SERIES 8-FT. PARK BENCH
WITH BACK - SURFACE MOUNT MODEL 595-6002 AS
MANUFACTURED BY HIGHLAND PRODUCTS GROUP/THE
PARK CATALOG, 931 VILLAGE BLVD STE 905-354, WEST
PALM BEACH, FL 33409, OR EQUIVALENT
2. SLAB TO BE CONSTRUCTED AS A CONC. WALK
CONFORMING TO FORM 818.
BENCH
EDGE OF SIDEWALK
MATCH GRADE
BIT. SIDEWALK
(NOT TO SCALE)
PARK BENCH W/CONCRETE SLAB
SECTION A-A
SLOPE = 1.5%
1
2" EXPANSION JOINT WITH
PRE-MOLDED
EXPANSION JOINT MATERIAL
5
8" x 12" LONG SMOOTH,
STEEL DOWEL
1' O/C - FREE AT ONE END
CLASS "C" CONCRETE SURFACE
FINISHED WITH A WOOD FLOAT
OR BY OTHER APPROVED
MEANS
1
2" EXPANSION JOINT WITH
PRE-MOLDED
EXPANSION JOINT MATERIAL
CONC. SLAB
5"
8"
AFTER
COMPACTION
GRANULAR FILL PLACED IN TWO
COURSES.
COMPACTED SUBGRADE
1
2" EXPANSION JOINT WITH
PRE-MOLDED EXPANSION
JOINT MATERIAL
EXPANSION JOINT
PLAN
EDGE OF
PAVEMENT
SIDEWALK
4"
6"
COMPACTED SUBGRADE
GRANULAR FILL PLACED IN TWO
COURSES.
6" x 6" #10 W.W.M.
A A
2' DETECTABLE
WARNING
SIDEWALK
WIDTH AS NOTED
(5' MIN.)
SLOPE ADJACENT LAWN/LANDSCAPED
AREA AS NECESSARY TO MEET THE
EDGE OF THE RAMP
CONCRETE RAMP
SLOPE DOWN TO PAVEMENT.  RAMP SLOPE
TO BE 2.0%.  RAMP SURFACE TO
BE BROOM FINISH PERPENDICULAR TO
DIRECTION OF TRAVEL.
5'-0"
EXIST. ROAD PAVEMENT
CLASS 'F' CONCRETE
SLOPE
1/4" PER FOOT
ELEVATION AT GUTTER
SHALL BE FLUSH WITH
ROADWAY PAVEMENT
2' DETECTABLE
WARNING
SECTION A-A
CONCRETE WALK RAMP DETAIL - W/NO EXIST. CURB AT PAVEMENT
(NOT TO SCALE)
OVERLAPPING TIMBER STEP DETAIL
ADDITIONAL NOTES:
1. TIMBER TO BE 8" X 8", #2 GROUND CONTACT ROUGH SAWN PRESSURE
TREATED LUMBER.
2. RISERS TO BE 7-1/2".  TREADS TO BE 14"
3. TIMBERS TO BE SET ON A 4-INCH COMPACTED STONE (CTDOT NO. 4)
BASE.
4. TREAD INFILL BETWEEN THE RISERS TO BE AASHTO #10 STONE DUST.
NO.DATEDESCRIPTION
REVISIONS
8/16/24   PER CTDOT COMMENTSGRANBY TOWN HALL
15 NORTH GRANBY ROAD
GRANBY, CONNECTICUT 06035
PHONE: (860) 844-5318     FAX:  (860) 844-5325
TOWN OF GRANBY
ENGINEERING DEPARTMENT
SCALE:DATE:JOB #:SHEET:
 1"=20'SEPTEMBER 3, 2026 2025.G01DE-1
DETAILS & NOTES
TOWN OF GRANBY
SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING
215 SALMON BROOK STREET
GRANBY, CONNECTICUT

Page 88

(NOT TO SCALE)
SILT FENCE DETAIL (GSF)
SLOPE
6"x6" TRENCH.
REPLACE AND COMPACT
WITH EXCAVATED
MATERIAL
12"
(MIN.)
30"
(MIN.)
PREFABRICATED SEDIMENT
FENCE.  U.S. SILT & SITE
SUPPLY/GETSCO
CT36112130 OR EQUIVALENT
(NOT TO SCALE)
SEDIMENT LOG DETAIL (ON BARE SOIL)DOWN SLOPE
NOTES:
1. CURLEX SEDIMENT LOGS AS MANUFACTURED BY AMERICAN
EXCELSIOR COMPANY.  SEDIMENT LOG SIZE TO BE 9-INCHES
UNLESS OTHERWISE NOTED ON THE PLANS.
2. TRENCH OPTION IS MOST APPLICABLE IN LOOSE,
UNCONSOLIDATED SOILS.
3. STAKE SIZE:
1 1 8" X 1 1 8" X 30" WOODEN STAKES ARE RECOMMENDED FOR
6", 9", AND 12" SEDIMENT LOGS.
1 1 8" X 1 1 8" X 48" WOODEN STAKES ARE RECOMMENDED FOR
20" SEDIMENT LOGS.
4. INSTALLATION TO BE AS PER THE MANUFACTURERS
INSTRUCTIONS.
16"
(MIN.)
CURLEX ®SEDIMENT LOGS
WOOD STAKE
WOOD STAKE TO ONLY
PENETRATE NETTING,
NOT CURLEX ®MATERIAL
SLOPE
SURFACE
PLANTING DETAIL
NOTE:
PRUNE LOWER BRANCHES OF TREE BACK
TO MAIN TRUNK SO THAT REMAINING
HEAD IS APPROX. 1/2 OF TOTAL TREE
HEIGHT
2xBALL
RADIUS
1'± MULCH EDGE
STAKING AND PLANTING TREE
WRAP TRUNK OF TREE WITH
STANDARD TREE WRAPPING PAPER
(CRAPE) STARTING FROM BOTTOM
WINDING UPWARDS
UNTIE BALLING STRING FROM BASE OF TRUNK
ALLOW THIN LAYER OF SOIL TO COVER BALL
DEPRESSION FOR WATER ACCUMULATION
BERM SIZE TO BE PROMINENT COMPACT
OUTER EDGE WITH FOOTPRINT
GROUND TREATED STAKES
(3 STAKES SPACED EQUIDISTANT)
PEEL BACK BURLAP
BACKFILL WITH 4 PARTS
TOPSOIL, 1 PART PEAT & 1
PART MANURE
RUBBER HOSE AT
CONTACT POINTS
6" (MIN.)
(NOT TO SCALE)
CONSTRUCTION ENTRANCE DETAIL (CE)
LENGTH = AS SHOWN ON PLAN (MIN.=30')
WIDTH = AS SHOWN ON PLAN (MIN. =12')
REMOVE TOPSOIL & ORGANICS
PRIOR TO PLACING GEOTEXTILE
& STONE
CONNDOT N0. 3
CRUSHED GRAVEL
GEOTEXTILE
PAVED ROAD
OR DRIVE
NO.DATEDESCRIPTION
REVISIONS
GRANBY TOWN HALL
15 NORTH GRANBY ROAD
GRANBY, CONNECTICUT 06035
PHONE: (860) 844-5318     FAX:  (860) 844-5325
TOWN OF GRANBY
ENGINEERING DEPARTMENT
SCALE:DATE:JOB #:SHEET:
 1"=20'SEPTEMBER 3, 2026 2025.G01DE-2
DETAILS & NOTES
TOWN OF GRANBY
SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING
215 SALMON BROOK STREET
GRANBY, CONNECTICUT

Page 89

GENERAL EROSION AND SEDIMENT CONTROL NOTES:
1. EROSION AND SEDIMENT CONTROL MEASURES SHALL CONFORM TO, "CONNECTICUT GUIDELINES FOR SOIL EROSION AND
SEDIMENT CONTROL, THE COUNCIL ON SOIL AND WATER CONSERVATION, ADOPTED MARCH 30, 2024," AS AMENDED.
2. THE SEDIMENT AND EROSION CONTROL NOTES AND DETAILS INCLUDED IN THE CONSTRUCTION DOCUMENTS MAY REFER TO
INFORMATION LOCATED IN THE GUIDELINES.  THE CONTRACTOR SHALL HAVE A COPY OF THE GUIDELINES AVAILABLE FOR
REFERENCE DURING CONSTRUCTION.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION, MAINTENANCE, AND REMOVAL OF ALL SEDIMENTATION AND
EROSION CONTROL MEASURES.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING THE NEARBY STREETS OF ANY SEDIMENT OR CONSTRUCTION
DEBRIS ORIGINATING FROM THIS PROJECT.
5. IF EXCESS MATERIAL FROM THE PROPOSED CONSTRUCTION IS TO BE REMOVED FROM THE SITE, THE CONTRACTOR SHALL
OBTAIN ALL NECESSARY PERMITS FOR  ITS DEPOSITION.
6. THE CONSTRUCTION ENTRANCE, IF NOTED,  AND THE SEDIMENT CONTROLS LOCATED AT THE PERIMETER OF THE PROPOSED
EDGE OF DISTURBANCE(S), SHALL BE INSTALLED PRIOR TO ANY CONSTRUCTION ACTIVITY.  INSTALLATION SHALL BE AS PER THE
MANUFACTURERS' INSTRUCTIONS AND AS DETAILED ON THESE PLANS.
7. ALL STORM DRAINAGE INLETS ARE TO BE PROTECTED FROM SEDIMENT INTRUSION.  SEDIMENT SHALL BE REMOVED FROM ALL
DRAINAGE  STRUCTURES, PIPE SYSTEMS, OUTLET STRUCTURES, RIP RAP, AND CHANNELS.
8. ALL STOCKPILES OF SOIL ARE TO BE ENCIRCLED WITH SILT FENCE.
9. THE CONTRACTOR SHALL EMPLOY TEMPORARY EROSION CONTROL MEASURES SUCH AS, SILT FENCE, HAY BALES, STONE
BARRIERS, EROSION CONTROL MATTING, SEDIMENT TRAPS, DEWATERING BASINS, AND TEMPORARY STORMWATER DIVERSIONS,
AS NECESSARY DURING CONSTRUCTION, TO PROTECT THE SITE AND ADJACENT PROPERTIES FROM EROSION.
10. ALL LOCATIONS, INCLUDING SWALES, LAWN AREAS, AND STORM SEWER DISCHARGE POINTS, THAT ARE TO RECEIVE A
CONCENTRATED FLOW OF STORMWATER, ORIGINATING FROM SURFACE FLOW OR STORM SEWER SYSTEMS, SHALL BE
STABILIZED AND PROTECTED FROM EROSION PRIOR TO RECEIVING THE WATER.
11. DAMAGED  SECTIONS OF SEDIMENT BARRIERS SHALL BE REPLACED BY THE CONTRACTOR.  SEDIMENT DEPOSITS SHALL BE
REMOVED BY THE CONTRACTOR WHEN THEY REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIER.  SEDIMENT
SHALL BE REMOVED IN A MANNER THAT DOES NOT CAUSE ADDITIONAL EROSION OR POLLUTION.
12. AT A MINIMUM, ALL SEDIMENT CONTROL MEASURES SHALL BE INSPECTED BY THE CONTRACTOR AT LEAST ONCE A WEEK AND
WITHIN 24 HOURS OF THE END OF A STORM WITH A RAINFALL AMOUNT OF 0.5 INCHES OR GREATER.   REPAIR SEDIMENT
CONTROL MEASURE AS NECESSARY.
13. DISTURBED AREAS ARE TO BE STABILIZED AS SOON AS POSSIBLE AFTER DISTURBANCE.  WHEN GRADING OF THE DISTURBED
AREA WILL BE SUSPENDED FOR A PERIOD OF 30 OR MORE CONSECUTIVE DAYS, BUT LESS THAN 5 MONTHS, STABILIZE THE SITE
WITHIN 7 DAYS OF THE SUSPENSION OF GRADING THROUGH THE USE OF MULCH OR OTHER MATERIALS APPROPRIATE FOR USE
AS A TEMPORARY SOIL PROTECTOR.  FOR SURFACES THAT ARE NOT TO BE REWORKED WITHIN 5 MONTHS BUT WILL BE
REWORKED WITHIN 1 YEAR, USE TEMPORARY SEEDING, MULCH FOR SEED OR WHEN SLOPES ARE LESS THAN 3:1, WOOD CHIPS,
BARK CHIPS OR SHREDDED BARK.  FOR SURFACES THAT ARE TO BE REWORKED AFTER 1 YEAR, USE PERMANENT SEEDING AND
MULCH FOR SEED.
14. EXCAVATED STUMPS AND CUT TREES ARE TO BE CHIPPED AND STOCKPILED FOR FUTURE USE, OR REMOVED TO AN OFF-SITE
DISPOSAL AREA.   BRUSH AND SLASH ARE TO BE CHIPPED AND STOCKPILE FOR FUTURE USE OR REMOVED FROM THE SITE.
EXCAVATED STUMPS, CUT TREES, BRUSH, AND SLASH, ARE NOT TO BE BURIED ON-SITE.
LAND GRADING (LG)
DESIGN CRITERIA
SLOPE DEFINED
SLOPE IS THE RELATIONSHIP OF HORIZONTAL DISTANCE TO VERTICAL DISTANCE AND IS REFERENCED AS EITHER
HORIZONTAL TO VERTICAL, A RATIO OF HORIZONTAL:VERTICAL OR A PERCENTAGE OF THE VERTICAL DIVIDED BY THE
HORIZONTAL.
SLOPE GRADIENT LIMITATIONS
VEGETATED MOWED SLOPES:  WHERE A SLOPE IS TO BE VEGETATED AND MOWED, THE SLOPE SHALL NOT BE
STEEPER THAN 3:1; FLATTER SLOPES ARE PREFERRED BECAUSE OF SAFETY FACTORS RELATED TO THE
OPERATION OF EQUIPMENT.
VEGETATED UNMOWED SLOPES:  WHERE A SLOPE IS TO BE VEGETATED BUT NOT MOWED, THE SLOPE SHALL
NOT BE STEEPER THAN 2:1.
STRUCTURALLY STABILIZED SLOPES:  FOR SLOPES STEEPER THAN 2: 1OR WHEN SLOPES ARE STEEPER THAN 3:
1 AND THE CHANGE IN ELEVATION EXCEEDS 15 FEET WITHOUT A CROSS SLOPE BENCH, ENGINEERED
STRUCTURAL DESIGN FEATURES SHALL BE INCORPORATED. APPLICABLE ENGINEERED MEASURES MAY INCLUDE
THOSE FOUND IN THE STABILIZATION STRUCTURES FUNCTIONAL GROUP (SEE FIGURE 3-4, SELECTION MATRIX)
OR OTHER STRUCTURAL MEASURES DESIGNED BY THE ENGINEER,
EXCEPTIONS:  SLOPE LIMITATIONS MAY BE INCREASED PROVIDING DETAILED SOIL MECHANICS ANALYSIS
CALCULATIONS ARE PERFORMED WHICH CONFIRM AN ACCEPTABLE SAFETY FACTOR FOR THE FINISHED SLOPE.
SLOPE LENGTH LIMITATIONS AND REVERSE SLOPE BENCHES
REVERSE SLOPE BENCHES ARE REQUIRED WHENEVER THE VERTICAL HEIGHT OF ANY SLOPE STEEPER THAN 3:1
EXCEEDS 15 FEET, EXCEPT WHEN ENGINEERED SLOPE STABILIZATION STRUCTURES MEASURES ARE INCLUDED IN THE
SLOPE AND/OR A DETAILED SOIL MECHANICS ANALYSIS CALCULATION HAS CONFIRMED AN ACCEPTABLE FACTOR OF
SAFETY EXISTS FOR THE FINISHED SLOPE.
CONTROLLING WATER MOVEMENT
MAKE PROVISIONS TO SAFELY CONDUCT SURFACE RUNOFF TO STORM DRAINS, PROTECTED OUTLETS OR TO STABLE
WATERCOURSES TO ENSURE THAT RUNOFF WILL NOT DAMAGE SLOPES OR OTHER GRADED AREAS.
SURFACE WATER:
MAXIMUM ALLOWABLE OVERLAND FLOW DISTANCE IN FEET TO THE TOP OF THE DESIGNED SLOPE WITH NO
DIVERSION OF SURFACE WATER IS DETERMINED BY USE OF THE FORMULA:
A=X (15-Y)
A = MAXIMUM OVERLAND FLOW DISTANCE IN FEET ABOVE THE CREST OF THE DESIGNED SLOPE
B = MAXIMUM HORIZONTAL DISTANCE IN FEET SHALL NOT EXCEED 15X.
X = SIDE SLOPE; HORIZONTAL DISTANCE IN FEET TO ONE FOOT VERTICAL (E.G., = 2 FOR DESIGNED
SLOPE 2:1)
Y = HEIGHT OF DESIGNED SLOPE IN FEET MEASURED VERTICALLY FROM TOE ELEVATION OF THE
DESIGNED SLOPE TO TOP OF CUT OR FILL FOR THE DESIGNED SLOPE.
EITHER DIVERT SURFACE WATER FROM THE FACE OF ALL CUT AND FILL SLOPES BY THE USE OF DIVERSIONS,
DITCHES AND DRAINAGE WAYS OR OTHERWISE CONVEY IT DOWN THE SLOPE BY THE USE OF OTHER
APPROPRIATE MEASURES. SURFACE WATER MAY BE ALLOWED TO FLOW DOWN CUT AND FILL SLOPES WHEN ALL
OF THE FOLLOWING CONDITIONS EXIST:
·THE LENGTH OF OVERLAND FLOW (IN FEET) TO THE CREST OF THE DESIGNED SLOPE DOES NOT EXCEED
THE DISTANCE "A";
·THE FACE OF THE SLOPE IS ALREADY STABLE OR THE FACE OF THE SLOPE IS PROTECTED FROM SURFACE
RUNOFF UNTIL IT IS STABILIZED;
·THE FACE OF THE SLOPE IS NOT SUBJECTED TO ANY CONCENTRATED FLOWS OF SURFACE WATER FROM
NATURAL DRAINAGE WAYS AND STRUCTURES SUCH AS GRADED DRAINAGE WAYS AND DOWNSPOUTS; AND
·THE MAXIMUM TOTAL HORIZONTAL OVERLAND FLOW (A) PLUS SLOPE DISTANCE (B) DOES NOT EXCEED 15
TIMES THE SIDE SLOPE (X) OF THE CUT OR FILL SLOPES.
SUBSURFACE WATER:
SUBSURFACE DRAINAGE SHALL BE PROVIDED WHERE NECESSARY TO INTERCEPT GROUNDWATER SEEPAGE
THAT WOULD OTHERWISE ADVERSELY AFFECT SLOPE STABILITY OR CREATE EXCESSIVELY WET SITE
CONDITIONS THAT WOULD HINDER OR PROHIBIT DESIRED VEGETATIVE GROWTH.
OTHER DESIGN LIMITATIONS
SLOPES SHALL NOT BE CREATED CLOSE TO PROPERTY LINES SO AS TO ENDANGER ADJOINING PROPERTIES WITHOUT
ADEQUATELY PROTECTING SUCH PROPERTIES AGAINST EROSION, SEDIMENTATION, SLIPPAGE, SETTLEMENT,
SUBSIDENCE OR OTHER RELATED DAMAGE.
SOIL MATERIAL USED FOR EARTH FILL SHALL BE OBTAINED FROM AN APPROVED BORROW PIT OR OTHER DESIGNATED
AREA.  THE FILL MATERIAL SHALL BE FREE OF BRUSH, RUBBISH, LARGE ROCKS, LOGS, STUMPS, BUILDING DEBRIS, AND
OTHER OBJECTIONABLE MATERIAL THAT WOULD INTERFERE WITH, OR PREVENT CONSTRUCTION OF, SATISFACTORY
FILLS. IT SHOULD BE FREE OF STONES OVER 2 INCHES IN DIAMETER WHERE COMPACTED BY HAND OR MECHANICAL
TAMPERS OR OVER 6 INCHES IN DIAMETER WHERE COMPACTED BY ROLLERS OR OTHER EQUIPMENT.  FROZEN
MATERIAL SHALL NOT BE PLACED IN THE FILL NOR SHALL THE FILL MATERIAL BE PLACED ON A FROZEN FOUNDATION.
STOCKPILES, BORROW AREAS AND SPOIL AREAS SHALL BE LOCATED AWAY FROM STEEP SLOPES AND SURFACE
WATERS AND SHALL BE SHOWN ON THE PLANS.  SOIL STOCKPILES SHALL BE SUBJECT TO THE PROVISIONS OF THIS
MEASURE.
ALL DISTURBED AREAS SHALL BE STABILIZED IN ACCORDANCE WITH THE E&S MEASURES CONTAINED IN THESE
GUIDELINES.
INSTALLATION REQUIREMENTS
1. PROTECT ALL GRADED OR DISTURBED AREAS INCLUDING SLOPES DURING CLEARING AND CONSTRUCTION IN
ACCORDANCE WITH THE APPROVED EROSION AND. SEDIMENT CONTROL PLAN UNTIL THEY ARE PERMANENTLY
STABILIZED.
2. CONSTRUCT AND MAINTAIN ALL EROSION AND SEDIMENT CONTROLS IN ACCORDANCE WITH THE APPROVED
EROSION AND SEDIMENT CONTROL PLAN.
3. CLEAR AND GRUB AREA TO BE GRADED. IN FILLED AREAS WHERE FILL EXCEEDS 5 FEET IN DEPTH, GRUBBING
MAY NOT BE REQUIRED.
4. STRIP AND STOCKPILE TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION IN AMOUNTS NECESSARY
TO COMPLETE FINISHED GRADING OF ALL EXPOSED AREAS.
5. USE ONLY FILL MATERIALS THAT ARE FREE OF BRUSH, RUBBISH, ROCKS, LOGS, STUMPS, BUILDING DEBRIS AND
OTHER OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR PREVENT CONSTRUCTION OF
SATISFACTORY FILLS. FROZEN MATERIAL OR SOFT, SATURATED OR HIGHLY COMPRESSIBLE MATERIALS SHALL
NOT BE INCORPORATED INTO FILLS. ROCK FILL AND OTHER CLEAN FILL! MAY BE USED PROVIDING IT DOES NOT
INTERFERE WITH THE CONSTRUCTION OF STRUCTURES.
6. PLACE AND COMPACT ALL FILL IN LAYERS NOT EXCEEDING 1 FOOT IN THICKNESS. NO EMBANKMENT LAYER
SHALL BE DEPOSITED ON SURFACES OF SNOW OR ICE NOR SHALL IT BE PLACED ON FROZEN OR UNSTABLE
SURFACES.  WHERE EMBANKMENTS ARE TO BE CONSTRUCTED ON SLOPES STEEPER THAN 3:1, DEEPLY SCARIFY
THE EXISTING SLOPE OR CUT INTO STEPS BEFORE FILLING IS BEGUN. IF FILL PLACEMENT IS NOT COMPLETED
WITHIN 1 DAY, THEN INSTALL TEMPORARY EROSION AND SEDIMENT CONTROLS, SUCH AS TEMPORARY FILL BERM,
AS NECESSARY TO REDIRECT RUNOFF WATER AWAY FROM THE UNSTABLE SLOPE UNTIL FILL PLACEMENT
RESUMES.
7 COMPACT ALL FILLS AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER
RELATED PROBLEMS. FILL THAT IS INTENDED TO SUPPORT BUILDINGS, STRUCTURES, CONDUITS AND OTHER
FACILITIES SHALL BE COMPACTED IN ACCORDANCE WITH THE DESIGN SPECIFICATIONS.
8. PRIOR TO FINAL SEEDING, ROUGHEN SLOPES 2:1 THROUGH 5:1 TO REDUCE RUNOFF VELOCITIES UNLESS THE
ENGINEER DIRECTS OTHERWISE.
9. IF AREAS ARE TO BE TOPSOILED, REFER TO THE TOPSOILING MEASURE (TO).
10. DURING ALL PHASES OF CONSTRUCTION KEEP REVERSE SLOPE BENCHES FREE OF SEDIMENT.
11. THE TREATMENT OF SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE REVIEWED AND
ADDRESSED BY THE ENGINEER IN ACCORDANCE WITH GENERALLY ACCEPTED ENGINEERING STANDARDS.
12. APPLY PERMANENT SOIL STABILIZATION MEASURES TO ALL GRADED AREAS WITHIN 7 DAYS OF ESTABLISHING
FINAL GRADE.  IF FINAL GRADING IS TO BE DELAYED FOR MORE THAN 30 DAYS AFTER LAND DISTURBANCE
ACTIVITIES CEASE, TEMPORARY SOIL STABILIZATION MEASURES (TSP) SHALL BE APPLIED IN ACCORDANCE WITH
THE TEMPORARY SEEDING (TS) MEASURE.
MAINTENANCE:
INSPECT AND MAINTAIN ALL EROSION AND SEDIMENT MEASURES IMPLEMENTED DURING LAND GRADING
OPERATIONS ACCORDING TO THEIR RESPECTIVE REQUIREMENTS.
TOPSOILING (TO), TEMPORARY (TS) AND PERMANENT SEEDING (PS):
1. TOPSOILING, TEMPORARY AND PERMANENT SEEDING, AND MULCHING MEASURES SHALL CONFORM TO, "2002,
CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL, THE CONNECTICUT COUNCIL ON SOIL
AND WATER CONSERVATION," AS AMENDED.
2. PROVISIONS SHALL BE MADE FOR SURFACE AND SUBSURFACE DRAINAGE, AS NEEDED, AND FOR THE DISPOSAL
OF RUNOFF WITHOUT CAUSING EROSION.
3. TOPSOIL SHALL INCLUSIVELY MEAN A SOIL:
·MEETING ONE OF THE FOLLOWING SOIL TEXTURAL CLASSES ESTABLISHED BY THE UNITED STATES
DEPARTMENT OF AGRICULTURE CLASSIFICATION SYSTEM BASED UPON THE PROPORTION SAND, SILT, AND
CLAY SIZE PARTICLES AFTER PASSING A 2 MILLIMETER (MM) SIEVE AND SUBJECTED TO A PARTICLE SIZE
ANALYSIS:
LOAMY SAND, INCLUDING COARSE, LOAMY FINE, AND LOAMY VERY FINE SAND,
LOAMY SAND, INCLUDING COARSE, LOAMY FINE, AND LOAMY VERY FINE SAND,
SANDY LOAM, INCLUDING COARSE, FINE AND VERY FINE SANDY LOAM,
LOAM, OR SILT LOAM WITH NOT MORE THAN 60% SILT;
·CONTAINING NOT LESS THAN 6% AND NOT MORE THAN 20% ORGANIC MATTER AS DETERMINED BY
LOSS-ON-IGNITION OF OVEN DRIED SAMPLES DRIED AT 105 DEGREES CENTIGRADE;
·POSSESSING A PH RANGE 6.0-7.5, EXCEPT IF THE VEGETATIVE PRACTICE BEING USED SPECIFICALLY
REQUIRES A LOWER PH, THEN PH MAY BE ADJUSTED ACCORDING;
·HAVING SOLUBLE SALTS NOT EXCEEDING 500 PPM; AND
·THAT IS LOOSE AND FRIABLE AND FREE FROM REFUSE, STUMPS, ROOTS, BRUSH, WEEDS, FROZEN
PARTICLES, ROCKS, AND STONES OVER 1.25 INCHES IN DIAMETER; AND ANY MATERIAL THAT WILL PREVENT
THE FORMATION OF A SUITABLE SEEDBED OR PREVENT SEED GERMINATION AND PLANT GROWTH.
TOPSOIL MAY BE OF NATURAL ORIGIN OR MANUFACTURED BY BLENDING COMPOSTED ORGANIC MATERIALS WITH
ORGANIC DEFICIENT SOILS, MINERAL SOILS, SAND AND LIME SUCH THAT THE RESULTING SOIL MEETS THE
MATERIAL SPECIFICATIONS LISTED ABOVE.  ALL TOPSOIL SHALL BE ANALYZED BY A RECOGNIZED SOIL TESTING
LABORATORY FOR ORGANIC CONTENT, PH AND SOLUBLE SALTS REQUIREMENTS GIVEN ABOVE.
4. PRIOR TO PLACING THE TOPSOIL, LOOSEN THE SUBGRADE BY DISCING OR SCARIFYING THE SURFACE TO A
DEPTH OF TWO (2) INCHES.  TOPSOIL SHALL BE APPLIED TO AT LEAST A MINIMUM COMPACTED DEPTH OF FOUR
INCHES.  COMPACTING IS TO INSURE A GOOD BOND WITH THE SUBGRADE AND TO OBTAIN A UNIFORM SEED BED.
DO NOT OVER COMPACT.  DO NOT APPLY TOPSOIL WHEN IN A FROZEN OR MUDDY CONDITION, OR WHEN THE
SUBGRADE IS EXCESSIVELY WET.
5. SEEDBED PREPARATION:
a. APPLY LIMESTONE AND FERTILIZER ACCORDING TO SOIL TESTS.  IF SOIL TESTING IS NOT FEASIBLE, OR
WHERE TIMING IS CRITICAL, FERTILIZER MAY BE APPLIED AT THE RATE OF 300 POUNDS PER ACRE USING
10-10-10 OR EQUIVALENT.  IN ADDITION, 300 POUNDS OF 38-0-0 OR EQUIVALENT OF SLOW RELEASE
NITROGEN MAY BE USED FOR TOP DRESSING.  APPLY GROUND LIMESTONE AT THE RATE OF THREE (3)
TONS PER ACRE.
b. WORK LIME AND FERTILIZER INTO THE SOIL AS NEARLY AS PRACTICAL TO A DEPTH OF FOUR (4) INCHES
WITH A DISK, SPRING TOOTH HARROW OR OTHER SUITABLE EQUIPMENT.  THE FINAL HARROWING OR
DISCING OPERATION SHOULD BE ON THE GENERAL CONTOUR.  CONTINUE TILLAGE UNTIL A REASONABLY
UNIFORM, FINE SEEDBED IS PREPARED.  ALL BUT CLAY OR SILTY SOILS AND COARSE SANDS SHOULD BE
ROLLED TO FIRM THE SEEDBED WHERE FEASIBLE.
c. REMOVE FROM THE SURFACE ALL STONES TWO (2) INCHES OR LARGER IN ANY DIMENSION.  REMOVE ALL
OTHER DEBRIS SUCH AS WIRE, CABLE, TREE ROOTS, PIECES OF CONCRETE, CLODS, LUMPS, OR OTHER
UNSUITABLE MATERIAL.
7. RECOMMENDED SEEDING DATES:
PERMANENT: APRIL 15 THROUGH JUNE 15
AUGUST 15 THROUGH SEPTEMBER 15
TEMPORARY: MARCH 1 TO JUNE 15
AUGUST 1 TO OCTOBER 1
8. RECOMMENDED SEED MIXTURES:
THE SEED MIXTURE SHALL BE ONE RECOMMENDED BY THE NATIONAL RESOURCES CONSERVATION SERVICE OR
THE FOLLOWING:
APPLICATIONSEED MIXTURELBS./1000 SQ. FT.
LAWNSKENTUCKY BLUEGRASS1.8
CREEPING RED FESCUE1.8
PERENNIAL RYE GRASS0.4
ROADSIDES OR SLOPESCREEPING RED FESCUE1.9
REDTOP0.2
TALL FESCUE OR SMOOTH BROMEGRASS1.9
SLOPES (NO MOWING)CREEPING RED FESCUE2.1
REDTOP0.2
CROWN VETCH WITH INOCULANT1.7
OR FLAT PEA WITH INOCULANT(3.5)
TEMPORARYWINTER RYE3.0
OR ANNUAL RYEGRASS3.0
9. SEEDING:
a. APPLY SEED UNIFORMLY BY HAND, CYCLONE SEEDER, DRILL, CULTIPACKER TYPE SEEDER OR
HYDROSEEDER (SLURRY INCLUDING SEED AND FERTILIZER).  NORMAL SEEDING DEPTH IS FROM 1/4 TO 1/2
INCH.  HYDROSEEDINGS WHICH ARE MULCHED MAY BE LEFT ON SOIL SURFACE.
b. WHERE FEASIBLE, EXCEPT WHERE EITHER A CULTIPACKER TYPE SEEDER OR HYDROSEEDER IS USED, THE
SEEDBED SHOULD BE FIRMED FOLLOWING SEEDING OPERATIONS WITH A ROLLER, OR LIGHT DRAG.
SEEDING OPERATIONS SHOULD BE ON THE CONTOUR.
c. IF SEEDING CANNOT BE DONE WITHIN THE SEEDING DATES, USE TEMPORARY MULCHING WITH AN
APPLICATION RATE OF 2.5 TO 3 TONS/ACRE TO PROTECT THE SITE AND DELAY SEEDING UNTIL THE NEXT
RECOMMENDED SEEDING PERIOD.
10. STABILIZING APPLIED TOPSOIL: IMMEDIATELY FOLLOWING TOPSOIL APPLICATIONS, PROTECT THE TOPSOIL FROM
EROSION BY EITHER SODDING, SEEDING AND/OR MULCHING.  ADDITIONAL STABILIZATION MEASURES MAY BE
REQUIRED.
GENERAL NOTES:
1. THE CONTRACTOR SHALL USE "CALL BEFORE YOU DIG, 1-800-922-4455" PRIOR TO ANY CONSTRUCTION ACTIVITY.
2. CONSTRUCTION METHODS AND MATERIALS, SHALL CONFORM TO THE REGULATIONS OF  CONNDOT FORM 818.AS AMENDED.
3. THE CONTRACTOR SHALL VERIFY ALL LINES AND GRADES PRIOR TO ANY CONSTRUCTION. ANY DISCREPANCIES SHALL BE
BROUGHT TO THE ATTENTION OF THE ENGINEER.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND INCURRING THE COST OF ALL REQUIRED PERMITS,
INSPECTIONS, CERTIFICATES, ETC.
5. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR JOBSITE SAFETY AND SHALL COMPLY WITH ALL FEDERAL AND STATE
OCCUPATIONAL SAFETY AND HEALTH AUTHORITY (O.S.H.A.) REGULATIONS.
6. THE CONTRACTOR SHALL PROVIDE, INSTALL, MAINTAIN AND REMOVE ALL SHORING, BRACING AND OTHER ITEMS NECESSARY
TO RETAIN BANKS OR EXCAVATIONS AND PREVENT CAVE-INS AND DISPLACEMENT OF ADJOINING GROUND.  SHORING AND
BRACING SHALL BE ENTIRELY INDEPENDENT OF FOOTINGS.
7. THE CONTRACTOR SHALL KEEP TRENCHES FREE FROM STANDING WATER AT ALL TIMES UNTIL PERMANENT WORK IS IN
PLACE.  ALL NECESSARY WELL-POINTING AND/OR PUMPING SHALL BE PERFORMED AND MAINTAINED AT THE CONTRACTOR'S
EXPENSE.
6. ALL EXPOSED CURB ENDS ARE TO BE TAPERED.
7. SAW CUT EXISTING CURBS AND PAVEMENT WHERE THEY MEET PROPOSED CURBS OR PAVEMENT.
MULCH FOR SEED (MS)
APPLICABILITY:  USED WITH TEMPORARY SEEDING AND PERMANENT SEEDING MEASURES.
MATERIALS
MULCH FOR SEED, INCLUDING TACKIFIERS AND NETTINGS USED TO ANCHOR MUCH, SHALL BE:
·BIODEGRADABLE OR PHOTO-DEGRADABLE WITHIN 2 YEARS HUT WITHOUT SUBSTANTIAL DEGRADATION
OVER A PERIOD OF 6 WEEKS,
·FREE OF CONTAMINANTS THAT POLLUTE THE AIR OR WATERS OF THE STATE WHEN PROPERLY APPLIED,
·FREE OF FOREIGN MATERIAL, COARSE STEMS AND ANY SUBSTANCE TOXIC TO PLANT GROWTH OR WHICH
INTERFERES WITH SEED GERMINATION, AND
·CAPABLE OF BEING APPLIED EVENLY SUCH THAT IT PROVIDES 80%-95% SOIL COVERAGE AND STILL
ADHERES TO THE SOIL SURFACE, DOES NOT SLIP ON SLOPES WHEN IT RAINS OR IS WATERED, DOES NOT
BLOW OF SITE, DISSIPATES RAINDROP SPLASH, HOLDS SOIL MOISTURE, MODERATES SOIL TEMPERATURES
AND DOES NOT INTERFERE WITH SEED GROWTH.
TYPES OF MULCHES WITHIN THIS SPECIFICATION INCLUDE, BUT ARE NOT LIMITED TO:
HAY:  THE DRIED STEMS AND LEAFY PARTS OF PLANTS CUT AND HARVESTED, SUCH AS ALFALFA, CLOVERS,
OTHER FORAGE LEGUMES AND THE FINER STEMMED, LEAFY GRASSES.  STEM LENGTH SHOULD NOT AVERAGE
LESS THAN 4 INCHES.  HAY THAT CAN BE WINDBLOWN MUST BE ANCHORED.  PREFERRED MULCH WHEN SEEDING
OCCURS OUTSIDE OF THE RECOMMENDED SEEDING DATES.
STRAW: CUT AND DRIED STEMS OF HERBACEOUS PLANTS, SUCH AS WHEAT BARLEY, CEREAL RYE, OR BROOM.
THE AVERAGE STEM LENGTH SHOULD NOT BE LESS THAN 4 INCHES. STRAW THAT CAN BE WINDBLOWN SHOULD
BE ANCHORED TO HOLD IT IN PLACE.
CELLULOSE FIBER: FIBER ORIGIN IS EITHER VIRGIN WOOD, POST-INDUSTRIAL/PRE-CONSUMER WOOD OR POST
CONSUMER WOOD COMPLYING WITH MATERIALS SPECIFICATION (COLLECTIVELY REFERRED TO AS "WOOD
FIBER"), NEWSPAPER, KRAFT PAPER, CARDBOARD (COLLECTIVELY REFERRED TO AS "PAPER FIBER") OR A
COMBINATION OF WOOD AND PAPER FIBER. PAPER FIBER, IN PARTICULAR, SHALL NOT CONTAIN BORON, WHICH
INHIBITS SEED GERMINATION. THE CELLULOSE FIBER MUST BE MANUFACTURED IN SUCH A MANNER THAT AFTER
THE ADDITION TO AND AGITATION IN SLURRY TANKS WITH WATER, THE FIBERS IN THE SLURRY BECOME
UNIFORMLY SUSPENDED TO FORM A HOMOGENEOUS PRODUCT.  SUBSEQUENT TO HYDRAULIC SPRAYING ON THE
GROUND, THE MULCH SHALL ALLOW FOR THE ABSORPTION AND PERCOLATION OF MOISTURE AND SHALL NOT
FORM A TOUGH CRUST SUCH THAT IT INTERFERES WITH SEED GERMINATION OR GROWTH. GENERALLY APPLIED
WITH TACKIFIER AND FERTILIZER. REFER TO MANUFACTURER'S SPECIFICATIONS FOR APPLICATION RATES
NEEDED TO ATTAIN 80%-95% COVERAGE WITHOUT INTERFERING WITH SEED GERMINATION OR PLANT GROWTH.
NOT RECOMMENDED AS A MULCH FOR USE WHEN SEEDING OCCURS OUTSIDE OF THE RECOMMENDED SEEDING
DATES.
OTHER MULCHES ALSO INCLUDE CORN STALKS AND OTHER SIMILAR ORGANIC MATERIALS PROVIDED THEY MEET THE
REQUIREMENTS LISTED IN THE FIRST PARAGRAPH OF THIS SECTION. DOES NOT INCLUDE MATERIALS SUCH AS WOOD
CHIPS, BARK CHIPS OR COCOA HULLS.
TACKIFIERS WITHIN THIS SPECIFICATION INCLUDE, BUT ARE NOT LIMITED TO:
WATER SOLUBLE MATERIALS THAT CAUSE MULCH PARTICLES TO ADHERE TO ONE ANOTHER, GENERALLY
CONSISTING OF EITHER A NATURAL VEGETABLE GUM BLENDED WITH GELLING AND HARDENING AGENTS OR A
BLEND OF HYDROPHILIC POLYMERS, RESINS, VISCOSIFIERS, STICKING AIDS AND GUMS.  GOOD FOR AREAS
INTENDED TO BE MOWED.  CELLULOSE FIBER MULCH MAY BE APPLIED AS A TACKIFIER TO OTHER MULCHES,
PROVIDED THE APPLICATION IS SUFFICIENT TO CAUSE THE OTHER MULCHES TO ADHERE TO ONE ANOTHER.
EMULSIFIED ASPHALT IS SPECIFICALLY PROHIBITED FOR USE AS TACKIFIER DUE TO ITS POTENTIAL FOR CAUSING
WATER POLLUTION FOLLOWING ITS APPLICATION.
NETTINGS WITHIN THIS SPECIFICATION INCLUDE, BUT ARE NOT LIMITED TO:
PREFABRICATED OPENWORK FABRICS MADE OF CELLULOSE CORDS, ROPES, THREADS, OR BIODEGRADABLE
SYNTHETIC MATERIAL THAT IS WOVEN, KNOTTED OR MOLDED IN SUCH A MANNER THAT IT HOLDS MULCH IN
PLACE UNTIL VEGETATION GROWTH IS SUFFICIENT TO STABILIZE THE SOIL.  GENERALLY USED IN AREAS WHERE
NO MOWING IS PLANNED.  EXAMPLES OF NETTING ARE TOBACCO NETTING (USED WHERE FLOWS ARE NOT
CONCENTRATED) AND JUTE NETTING (TYPICALLY USED IN DRAINAGEWAYS).
SUBSTITUTE MEASURES:WHERE MULCH ANCHORING IS REQUIRED A TEMPORARY EROSION CONTROL BLANKET
MAYBE USED.
SITE PREPARATION:FOLLOW REQUIREMENTS OF PERMANENT SEEDING OR TEMPORARY SEEDING.
APPLICATION
TIMING:  APPLIED IMMEDIATELY FOLLOWING SEEDING. SOME CELLULOSE FIBER MAY BE APPLIED WITH SEED TO
ASSIST IN MARKING WHERE SEED HAS BEEN SPRAYED, BUT EXPECT TO APPLY A SECOND APPLICATION OF
CELLULOSE FIBER TO MEET THE REQUIREMENTS OF MULCH FOR SEED.
SPREADING:  MULCH MATERIAL SHALL BE SPREAD UNIFORMLY BY HAND OR MACHINE RESULTING IN 80%-95%
COVERAGE OF THE DISTURBED SOIL WHEN SEEDING WITHIN THE RECOMMENDED SEEDING DATES.
APPLICATIONS THAT ARE UNEVEN CAN RESULT IN EXCESSIVE MULCH SMOTHERING THE GERMINATING SEEDS.
FOR HAY OR STRAW ANTICIPATE AN APPLICATION RATE OF 2 TONS PER ACRE. FOR CELLULOSE FIBER FOLLOW
MANUFACTURER'S RECOMMENDED APPLICATION RATES TO PROVIDE 80%-95% COVERAGE.
WHEN SEEDING OUTSIDE THE RECOMMENDED SEEDING DATES, INCREASE MULCH APPLICATION RATE TO PROVIDE
BETWEEN 95%-100% COVERAGE OF THE DISTURBED SOIL.  FOR HAY OR STRAW ANTICIPATE AN APPLICATION RATE OF
2.5 TO 3 TONS PER ACRE.
WHEN SPREADING HAY MULCH BY HAND, DIVIDE THE AREA TO BE MULCHED INTO APPROXIMATELY 1,000 SQUARE FEET
AND PLACE 1.5-2 BALES OF HAY IN EACH SECTION TO FACILITATE UNIFORM DISTRIBUTION.  FOR CELLULOSE FIBER
MULCH, EXPECT SEVERAL SPRAY PASSES TO ATTAIN ADEQUATE COVERAGE, TO ELIMINATE SHADOWING, AND TO
AVOID SLIPPAGE (SIMILAR TO SPRAYING WITH PAINT).  MACHINE CLOGGING CAN OCCUR IF PRODUCT IS IMPROPERLY
LOADED OR IF LEFTOVER PRODUCT IS LEFT IN MACHINE WITHOUT CLEANING. COMPLY WITH THE MANUFACTURER'S
RECOMMENDATIONS FOR APPLICATION REQUIREMENTS AND MULCH MATERIAL SPECIFICATIONS.
ANCHORING:  WHEN NEEDED, MULCH ANCHORING IS APPLIED EITHER WITH THE MULCH AS WITH CELLULOSE
FIBER OR APPLIED IMMEDIATELY FOLLOWING MULCH APPLICATION.  EXPECT THE NEED FOR MULCH ANCHORING
ALONG THE SHOULDERS OF ACTIVELY TRAVELED ROADS, HILL TOPS AND LONG OPEN SLOPES NOT PROTECTED
BY WIND BREAKS.
WHEN USING NETTING, THE MOST CRITICAL ASPECT IS TO ENSURE THAT THE NETTING MAINTAINS SUBSTANTIAL
CONTACT WITH THE UNDERLYING MULCH AND THE MULCH, IN TURN, MAINTAINS CONTINUOUS CONTACT WITH
THE SOIL SURFACE.  WITHOUT SUCH CONTACT, THE MATERIAL IS USELESS AND EROSION OCCURS. INSTALL IN
ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
MAINTENANCE
INSPECT MULCHED AREAS AT LEAST ONCE A WEEK AND WITHIN 24 HOURS OF THE END OF A STORM WITH A RAINFALL
AMOUNT OF 0.5 INCH OR GREATER UNTIL THE GRASS HAS GERMINATED TO DETERMINE MAINTENANCE NEEDS.
WHERE MULCH HAS BEEN MOVED OR WHERE SOIL EROSION HAS OCCURRED, DETERMINE THE CAUSE OF THE FAILURE.
IF IT WAS THE RESULT OF WIND, THEN REPAIR EROSION DAMAGE (IF ANY), RE-APPLY MULCH (AND SEED AS NEEDED)
AND CONSIDER APPLYING A NETTING OR TACKIFIER. IF MULCH FAILURE WAS CAUSED BY CONCENTRATING WATER,
INSTALL ADDITIONAL MEASURES TO CONTROL WATER AND SEDIMENT MOVEMENT, REPAIR EROSION DAMAGE,
RE-APPLY MULCH AND CONSIDER APPLYING A NETTING OR TACKIFIER OR USE THE TEMPORARY EROSION CONTROL
BLANKET MEASURE.  ONCE GRASS HAS GERMINATED, INSPECTIONS SHOULD CONTINUE AS REQUIRED BY TEMPORARY
SEEDING AND PERMANENT SEEDING.
PROJECT NARRATIVE:
THE PROPOSED PROJECT  CONSISTS OF THE CONSTRUCTION OF A PEDESTRIAN WALKING PATH IN THE TOWN PARK.  THE PURPOSE OF THE
WALK IS TO CONNECT THE EXISTING BITUMINOUS WALK WITH A NEW WALK THAT WILL PROVIDE AN ACCESSIBLE ROUTE TO THE ROVERS
SOCCER FIELDS.  THE EXISTING WOODS TRAIL FROM THE PARKING LOT TO THE NORTHERNMOST FIELD WILL BE REBUILT IN IT'S CURRENT
LOCATION.  A SERIES OF STAIRS WILL BE ADDED TO THE PATH TO EASE THE ASSENT OF THE STEEP SLOPE.
THE PROJECT AREA IS APPROXIMATELY 25,580 S.F OF THE EXISTING 116 ACRE PARK.  THE 5-FT WIDE NEW BITUMINOUS WALK WILL BE
APPROXIMATELY 1514 FEET LONG COVERING 7680 SF AND WILL MOSTLY BE LOCATED IN EXISTING GRASSED AREAS.   PROPOSED GRADES WILL
MOSTLY MATCH THE EXISTING GRADES.  THE WALK WILL BE CONSTRUCTED OF BITUMINOUS CONCRETE AS IS INTENDED FOR PEDESTRIAN
WALKING USE.  THE PROPOSED WOODS TRAIL WILL FOLLOW THE EXISTING ROUTE.  THE PATH WILL BE REBUILT AS A 6-FT WIDE  STONE DUST
PATH WITH STAIRS.  THE THE PATH IS 630-FT LONG AND COVERS APPROXIMATELY 3790 S.F.
THE SITE CONTAINS APPROXIMATELY 2,693,000 SF (61.8 AC.) OF WETLAND SOILS AND WATERCOURSES.  THE WETLAND SOILS ARE  OCCUM FINE
SANDY LOAM AND SUNCOOK LOAMY FINE SAND WHICH ARE ALLUVIAL AND FLOOD PLAIN SOILS.  THEY ARE PRESENTLY COVERED BY 89,358 SF
(2.1 AC.) OF IMPERVIOUS SURFACE.  APPROXIMATELY 1,600 LF (8000 SF) OF BITUMINOUS WALK WILL BE LOCATED IN WETLAND (FLOODPLAIN)
SOILS.  THE RECONSTRUCTED WOODS PATH WILL COVER APPROXIMATELY 2722 S.F. OF WETLANDS/REGULATED AREA.  IN ADDITION, A TOTAL
OF 15,000 SF OF WETLAND (FLOODPLAIN) AREA WILL BE DISTURBED.  ALL EXCEPT 9960 SF. WILL BE TEMPORARY.
THE BALANCE OF THE SITE CONTAINS HINCKLEY GRAVELY SANDY LOAM SOILS OR IS HINCKLEY URBAN LAND COMPLEX.  OTHER THAN THE
FLOOD PLAIN SOILS, THERE ARE NO SIGNIFICANT AREAS OF WETLAND SOILS. EXCEPT FOR THE AREA ADJACENT TO THE WEST BRANCH OF
SALMON BROOK WHICH IS LOCATED ALONG THE WESTERLY BORDER OF THE PROJECT.  THERE ARE NO ACTIVITIES PROPOSED WITHIN THE
BROOK AND EXISTING DRAINAGE PATTERNS WILL BE MAINTAINED.
TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES WILL BE IMPLEMENTED DURING CONSTRUCTION.  THE ANTICIPATED
CONSTRUCTION WILL BEGIN IN THE SPRING OF 2027 AND END IN THE FALL OF 2027.
THE RESPONSIBLE PARTY IS:
SANDRA YOST
DIRECTOR OF COMMUNITY SERVICES
TOWN OF GRANBY
860-844-5351
MITIGATION ACTIVITIES NARRATIVE:
IMPACTS ASSOCIATED WITH THE CONSTRUCTION AND MAINTENANCE OF THE PROPOSED SIDEWALK AND SITTING AREAS ARE MINIMAL, LIMITED
TO THE ADDITION OF IMPERVIOUS AREA WITHIN AN ALLUVIAL WETLAND AND THE URA OF THE SALMON BROOK. THE AREA WHERE THE
SIDEWALK WILL BE INSTALLED IS CURRENTLY MAINTAINED LAWN FOR RECREATION, AND AS PART OF THE PROJECT THE LAWN AREA WILL BE
RESTORED TO NATIVE VEGETATION AS DESIGNATED BY THE FOLLOWING MITIGATION PLAN BELOW AND AS DEPICTED ON THE “PLAN TOWN OF
GRANBY SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING, 215 SALMON BROOK STREET, GRANBY, CT”, DATED 9.3.26, COVER SHEET,
C1-C4 AND DE1-DE3, AS AMENDED.
POTENTIAL IMPACTS DURING CONSTRUCTION ARE LIMITED TO SEDIMENT MIGRATION FROM THE CONSTRUCTION AREA INTO A REGULATED
AREA. AS SEEN DURING THE FIRST PHASE OF THE SIDEWALK, SOIL DISTURBANCE ASSOCIATED WITH THIS PROJECT IS MINIMAL AND
TEMPORARY. BARRIER EROSION CONTROLS WILL BE TEMPORARILY PLACED AS NECESSARY TO PREVENT SEDIMENT MIGRATION DURING
PRECIPITATION EVENTS, AND THE AREA WILL BE SEEDED AND MULCHED AS SOON AS POSSIBLE. A QUICK GERMINATING SEED MIX WILL
PROVIDE FOR BOTH RAPID AND LONG-TERM VEGETATIVE STABILIZATION.
THIS PROJECT COULD POTENTIALLY FIT THE REQUIREMENTS OF A NONREGULATED USE, DUE TO THE GOAL OF PROVIDING EQUITABLE
OUTDOOR RECREATION OPPORTUNITIES, HOWEVER, IT REQUIRES A GOOD AMOUNT OF DISTURBANCE AND THEREFORE A PERMIT IS
REQUESTED. THE TOWN PROPOSES TO INCORPORATE VEGETATION MANAGEMENT AND PLANTING EFFORTS AT KEY AREAS ALONG THE
PROJECT ROUTE. THESE AREAS WERE SELECTED WHERE AREAS COULD USE DEEPLY ROOTED VEGETATION FOR LONG-TERM SOIL
STABILIZATION MEASURES ADJACENT TO THE SALMON BROOK. PLANTINGS IN THE CHOSEN LOCATIONS WILL PROVIDE ADDITIONAL
VEGETATIVE BUFFERS ALONG SALMON BROOK, AIDING IN LONG-TERM BANK STABILITY AND PARK/PROJECT PROTECTION.
MITIGATION EFFORTS SHALL BE SUPERVISED DAILY DURING VEGETATION REMOVAL AND PLANTING OPERATIONS BY THE GRANBY WETLANDS
AGENT OR THE IWWC DESIGNEE. THESE EFFORTS SHALL INCLUDE INVASIVE SPECIES REMOVAL, SOIL STABILIZATION PLANTINGS, AND
SIGNAGE AT A SALMON BROOK ACCESS TRAIL. THE FOLLOWING DESCRIBES THE MITIGATION ACTIVITIES IN DETAIL FOR THE PROJECT,
INCLUDING HOW EACH MITIGATION AREA SHALL BE TREATED.
SITEWIDE:
ALONG THE PROJECT ROUTE, ALL VINES THAT ARE CHOKING TREES SHALL BE CUT AT THEIR BASE AND AN HERBICIDE APPLIED TO THE
FRESH CUT STUMP. A CONE SPRAYER OR PAINT ON METHOD MAY BE UTILIZED AND APPLIED IN ACCORDANCE WITH ALL APPLICABLE
LAWS.
THE EXTENT OF ORIENTAL BITTERSWEET (CELASTRUS ORBICULATUS) IN SOME LOCATIONS IS EXTENSIVE, AND COMPLETE ERADICATION
IS HIGHLY UNLIKELY DUE TO THE RIVERINE LOCATION PROVIDING A CONSTANT SEED SOURCE FOR POTENTIAL SPECIES 
RE-ESTABLISHMENT. THEREFORE, A MORE REALISTIC GOAL IS TO PRESERVE MATURE TREES THAT ARE BEING “STRANGLED” BY VINES.
VINES DO NOT NEED TO BE REMOVED FROM THE TREE OR THE SITE BUT ALLOWED TO DEGRADE IN PLACE.
AS DIRECTED BY THE SUPERVISING IWWC DESIGNEE, TARGET INVASIVE SPECIES SHALL BE REMOVED AND PROPERLY DISPOSED. THE
TARGET SPECIES INCLUDES BUT IS NOT LIMITED TO LARGE AUTUMN OLIVE (ELAEAGNUM UMBELLATA) AND MULTIFLORA ROSE (ROSA
MULTIFLORA) SPECIES.
AREA 1:
THIS AREA IS ADJACENT TO A BEND IN THE SALMON BROOK AND IS CURRENTLY MAINTAINED LAWN. TO AID IN PRESERVING THE UPLAND
AREA ADJACENT TO THE BANKS, 3 TREES AND 10 SHRUBS ARE RECOMMENDED TO BE INSTALLED IN THIS AREA. INCLUDED IN THIS AREA
ARE 3 PERENNIAL ISLANDS, EACH PERENNIAL ISLAND SHALL INCLUDE 6 HERBACEOUS PLANTINGS.DORMANT BROADCASTING OF A 
NATIVE SEED MIX SHALL BE COMPLETED BEFORE THE FIRST FROST OF THE FIRST YEAR OF THE PROJECT AS SPECIFIED BY THE IWWC OR
THEIR DESIGNEE. MOWING SHALL OCCUR IN SPRING AND LATE FALL ONLY TO ALLOW FOR THE SEED STOCK TO FORM SUBSTANTIAL
ROOTS. IT IS RECOMMENDED THAT THE AREA CONTINUE TO BE MOWED BETWEEN THE TREE AND SHRUBS FOR 2 YEARS, OR LONGER IF
APPROVED, TO PREVENT INVASIVE SPECIES OVERGROWTH. ONCE STRONG ESTABLISHMENT OF PLANTINGS, THE AREA MAY NO LONGER
BE MOWED. ALL PLANTINGS SHALL BE CLEARLY STAKED.
AREA 2:
THIS AREA IS VEGETATED BUT DOES NOT CONTAIN ANY CANOPY TREES. IT IS PROPOSED TO INSTALL 1 TREE IN THIS LOCATION THAT IS
GREATER THAN 6 FEET TALL. AN AREA AROUND THE TREE INSTALLATION AREA SHALL BE CLEARED OF INVASIVE SPECIES. MOWING 
AROUND INSTALLED TREES SHALL OCCUR FOR 2 FULL GROWING SEASONS.
AREA 3:
THIS AREA IS VEGETATED BUT DOES NOT CONTAIN ANY CANOPY TREES. IT IS PROPOSED TO INSTALL 2 TREES AND 6 SHRUBS IN THIS
LOCATION THAT IS GREATER THAN 6 FEET TALL. AN AREA AROUND THE TREE INSTALLATION AREA SHALL BE CLEARED OF INVASIVE 
SPECIES. MOWING AROUND INSTALLED TREES SHALL OCCUR FOR 2 FULL GROWING SEASONS.
AREA 4:
THIS AREA IS VEGETATED BUT DOES NOT CONTAIN ANY CANOPY TREES. IT IS PROPOSED TO INSTALL 1 TREE IN THIS LOCATION THAT IS
GREATER THAN 6 FEET TALL. AN AREA AROUND THE TREE INSTALLATION AREA SHALL BE CLEARED OF INVASIVE SPECIES. MOWING 
AROUND INSTALLED TREES SHALL OCCUR FOR 2 FULL GROWING SEASONS.
AREA 5:
ALONG THE TREE LINE, A LINE OF HERBACEOUS PERENNIALS ARE PROPOSED TO BE INSTALLED. THIS WILL INCREASE THE ROOT PROFILE
AND REDUCE MOWING IN THIS CRITICAL LOCATION.
AREA 6:
THIS AREA IS VEGETATED BUT DOES NOT CONTAIN ANY CANOPY TREES. IT IS PROPOSED TO INSTALL 2 TREES AND 6 SHRUBS IN THIS
LOCATION THAT IS GREATER THAN 6 FEET TALL. AN AREA AROUND THE TREE INSTALLATION AREA SHALL BE CLEARED OF INVASIVE 
SPECIES. MOWING AROUND INSTALLED TREES SHALL OCCUR FOR 2 FULL GROWING SEASONS.
VEGETATION PLANTING SPECIES SELECTION:
TREES: RED MAPLE (ACER RUBRUM), SHAGBARK HICKORY (CARYA OVATA), AMERICAN ELM (ULMUS AMERICANA), COTTONWOOD
(POPULUS DELTOIDES), GREEN ASH (FRAXINUS PENNSYLVANICA),  WILLOW SP. (SALIX SP), BLACK BIRCH (BETULA LENTA) AND
AMERICAN SYCAMORE (PLATANUS OCCIDENTALIS).
SHRUBS: STAGHORN SUMAC (RHUS TYPHINA), SWEET PEPPERBUSH (CLETHRA ALNIFOLIA), AND ELDERBERRY (SAMBUCUS ANADENSIS)
HERBACEOUS PERENNIALS: COMMON MILKWEED (ASCLEPIAS SYRIACA), BLACK-EYED SUSAN (RUDBECKIA HIRTA), BROWN-EYED
SUSAN (RUDBECKIA TRILOBA)
DORMANT SEED MIX:  OX-EYE SUNFLOWER (HELIOPSIS HELIANTHOIDES), FALSE INDIGO (BAPTISIA SP.) , PARTRIDGE PEA 
(CHAMAECRISTA FASCICULATA), PURPLE CONEFLOWER (ECHINACEA PURPUREA), RUBECKIA SP, AND SEDGES AND
GRASSES AS MIXED OR SPECIFIED
NO.DATEDESCRIPTION
REVISIONS
10/06/26   PER WETLANDS AGENT COMMENTSGRANBY TOWN HALL
15 NORTH GRANBY ROAD
GRANBY, CONNECTICUT 06035
PHONE: (860) 844-5318     FAX:  (860) 844-5325
TOWN OF GRANBY
ENGINEERING DEPARTMENT
SCALE:DATE:JOB #:SHEET:
 1"=20'SEPTEMBER 3, 2026 2025.G01DE-3
DETAILS & NOTES
TOWN OF GRANBY
SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING
215 SALMON BROOK STREET
GRANBY, CONNECTICUT

Page 90

Page 91

Page 92

WETLAND AND SOIL SCIENCES & ENVIRONMENTAL CONSULTING 
P.O. Box 233 | Granville, MA 01034 413.695.2195 
freshwaterwetland@gmail.com 
 
 
 
 
 
October 8, 2026 
 
Re: Memo – 7 Laurel Drive – Inland Wetlands Agent Review, Kate Bednaz 
 
The following is my review of the application materials submitted as part of the current 
application for 7 Laurel Drive. As part of this review, I have reached out to IWWC members to 
understand their perspective on the proposed activities as it relates to the resolution of yours 
and the past owners active Enforcement Orders (EO).  The overall consensus of application 
reviewers is that the current layout and request as it relates to the wetland/drainage swale and 
shed area be re-evaluated due to the level of impact proposed to the wetland. In general, 
wetland disturbance is permitted if wetland area or other beneficial area is created on a 1:1, if 
not a 2:1 ratio.  
It is understood per Mr. Stansfield that “… It has been and remains my opinion that if any 
impairment of the wetlands on the subject property been done, it was prior to my initial 
inspection. Due to the apparent historic grading and filling that likely occurred as part of the 
original residential development of the parcel, including water and sewage infrastructure, very 
few of the typical wetland functions we commonly associate with pristine wetland areas are 
evident and it is unlikely, due to manipulation of the fragile wetland soils that may have existed 
prior to development, that a manufactured mitigation scenario would be successful. I would 
recommend that the disturbed areas be vegetated and the on-site water be accommodated to 
minimize water damage to the structures.” I agree with this statement, however, impacts did 
become enhanced post the initial enforcement actions. It is my opinion that at this point it is 
our goal is to balance the functions and values provided by the wetland area, while providing 
a usable lot considering historical development choices. Providing/maintaining the essential 
function of this area which is area that provides hydrologic stability and control of flooding 
and erosion; to the recharging and purification of groundwater; and to the existence of many 
forms of animal, aquatic and plant life.  
The following are additional review comments.  
a. No concerns were raised regarding maintaining the installation of the permitter fence 
if it is not located within stormwater flow pathways and provides for amphibian 
migration through large holes in the fencing.  
b. No concerns were strongly raised regarding the removal of the pine trees. However, 
concerns were raised regarding the removal of non-invasive woody species behind the 
existing shed, as woody vegetation offers roughness to reduce erosion, slow flow, and 
uptake nutrients. This concern extends to the portion of the woody tree line that is 
located along the northerly property boundary, adjacent to the canal and the wetland. 
It is recommended that the area adjacent to the canal, that will receive stormwater at 
an elevation that provides for potential for stormwater infiltration and be vegetated 
with woody and herbaceous species. 
c. No concerns were raised regarding the elimination of the portion of the wetland 
adjacent to the existing house or the gravel parking area. However, the extent of 
piping proposed to behind the current shed locations eliminates the majority of 
potential for the hydrological benefits intended to be preserved on this property.  

Page 93

WETLAND AND SOIL SCIENCES & ENVIRONMENTAL CONSULTING 
P.O. Box 233 | Granville, MA 01034 413.695.2195 
freshwaterwetland@gmail.com 
 
a. To maintain wetland conditions and provide for the intended functions and 
values it is recommended that less of the wetland be piped. The pipe should be 
pulled back towards the house provide enough volume to maintain wetland 
soils and provide for a vegetated infiltration area. This will likely necessitate 
moving the shed to provide for greater area to maintain the functions and 
values of the wetland area to the maximum extent practicable. Please note that 
some members thought that the entire wetland needed to be restored to the 
maximum extent practicable.  
It is the consensus, the request to lose wetlands adjacent to the home, or farther, requires that 
an area be preserved to maintain the functions and values as referenced above. This natural, 
unmaintained area can be landscaped with native species that are pleasing to the eye and 
functional to our ecosystems. The IWWC members and myself that a balance can be achieved 
to maintain if not improve wetland conditions while maintaining the mentioned property line 
privacy screening.  

Page 94

TOWN OF GRANBY 
  Office of Community Development, Inland Wetlands and Watercourses Commission 
Telephone: (860) 844-5318, www.granby-ct.gov 
A
pplication for Inland Wetlands & Watercourses Activity 
Application For: Permit  Extension  Modification (Existing Permit/Application #):  __________________________ 
Wetlands Map Amend.  Request for Review Other: 
Property Location and Nearest Intersection: 
Size of Parcel:_________ Zone: ________ Map/Lot: ____________ Current Use: ___________________________ 
Applicant’s Name:  
Complete Address:  
Daytime Phone:   Evening Phone:  Fax: 
Email: 
Owner’s Name: 
If the owner is a corporation, or other non-individual entity, include the primary contact information 
Complete Address:  
Phone Daytime Phone:      Evening Phone:  Fax: 
Applicant’s Representative:  
Complete Address:  
Daytime Phone:  Evening Phone:     Fax: 
Wetlands Located on Property (in square feet (sq. ft.)):   Wetlands to be impacted (sq. ft.): 
Watercourses Located on Property?  Name or Type of Watercourse:   
Are Proposed Activities Located within the 100-Year Floodplain?   Floodway?  
Are there slopes with grades in excess of 15% located on the property?  
Do Proposed Activities Require Review by the PZC?  
    *********SEE APPLICATION CHECKLIST ON BACK for MINIMUM APPLICATION REQUIREMENTS********** 
The applicant understands that this application is to be considered complete only when all information and documents required  by 
the Commission have been submitted. The undersigned warrants the truth of all statements contained herein and in all supporting  
documents according to the best of his/her knowledge and belief. Permission is granted to the Town of Granby, Inland Wetlands & 
Watercourses Commission, and its agent (s) to inspect the subject land, at reasonable times, during the pendency of an application 
and for the life of the permit. 
Applicant’s Signature: Date: 
       Owner’s Signature:  Date: 
FOR OFFICE USE 
   Application #: Date Submitted: 
   Fee amt./Check or Cash: Date of Receipt: 
   Agent Ruling: Date Approved/Denied: 
See Reverse Side for Conditions of Approval or Reason for Denial 
X
East/northeast of Salmon Brook St (Rt. 10) & Floydville Rd intersection
215.36 ac I 53/78/28 Nursery
Broadleaf Solar, LLC
575 Fifth Ave., 24th Fl., New York, NY 10017
(212) 478-0000
jon.gravel@desri.com
Broadleaf Solar, LLC
575 Fifth Ave., 24th Fl., New York, NY 10017
(212) 478-0000
Jonathan Gravel
575 Fifth Ave., 24th Fl., New York, NY 10017
207-239-8782 207-239-8782
*******************************PLEASE ATTACH ADDITIONAL SHEET IF NECESSARY************************************** Project Name 
and Brief Description (i.e. residential, agricultural, commercial, number of lots, etc.):  Following the seeding stabilization
 and agronomic E&S work previously presented to the IWWC, Broadleaf reviewed the areas where sediment has historically/recently left the 
site. No new sediment has left the site since installation of erosion and sedimentation measures (sediment traps, barriers, blankets) and an 
evaluation of sediment near/within wetlands was conducted.  Refer to enclosed documentation on the finding and recommendation. 
Is any portion of the property located within 500 feet of an adjoining municipality?  Yes
1 Mil +/-
Yes Unnamed tributaries to Salmon Brook
No No
Yes, but not subject to proposed work
No

Page 95

   
Northern Sand Deposit 
 
 

Page 96

 
 
 
Photo 1 - View Looking North from edge of field – note extensive waddles and no new sediment from installation 
 
Photo 2 – View looking South from wetland boundary (upland 7–8 inch deposit)  

Page 97

 
 
 
Photo 3 – View looking southerly at 6–7-inch deposit at with within wetland boundary 
 
Photo 4 – View looking NWN along broadest potion of sand deposit from upland 

Page 98

 
 
 
Photo 5 – leading edge 1-2 inches of sediment down gradient of waddle 2-4 up to small tree in foreground and top 
of the image.  
  

Page 99

 
 
Sumatra Pond -Spillway – Sand Deposit  
 

Page 100

 
 
 
Photos 1 – Looking at Spillway from Road upland area. Note: multiple barriers in place, no new sedimentation 
beyond silt fence,  spillway was bulldozed by previous owner/operator from this location and into the tree 
line  
 
Photo 2 – Upland deposit 8 – 9 inches typical, but ranges in depth throughout upland area. 

Page 101

 
 
 
Photo 3 – Wetland deposit 6-8 inches less deposition along the edges  
 
Photo 4 – Wetland deposit 4-6 inches (conservative average) but varies by location 1-6 inches.  

Page 102

 
 
 
Photo 5 -Wetland deposit 3-4 inches at leading edge of sediment. 
 
Photo 6 – Upland scour downgradient of leading edge (Photo 5 above) Note: This is a pre-existing condition do to 
previous bulldozing spillway and no deposition observed.  

Page 103

 
 
Floydville Road Upland Deposit 
 
Action: No New Action Planned – Area stable 
 
 

Page 104

 
 
 
Photo 1 –  Facing south towards Floydville Road at receiving end of culvert view looking at upland Swale vegetated – waddles 
were placed in June/July ahead of seeding effort. 
 
Photo 2 – Existing Culvert – set high large plunge pool below. No flow but moist at bottom of pipe. 

Page 105

 
 
 
Photo 3 – View looking northern along in sized stream experience heavy flash flow during nursery operation (storm events X 
irrigation). Pre-existing condition no deposition of sand within stream course. No flow in stream 
  

Page 106

 
 
Unnamed Tributary to Salmon Brook - Via Sumatra Pond 
 
Photo 1 – Looking downstream at sand bars likely influenced by historical sand sedimentation from 
previous nursery activities. In the foreground is a broader riparian and confluence of Salmon Brook. 
 
Photo 2 – Looking Downstream along stream channel. Minimal historical deposition present.  

Page 107

 
 
 
Photo 3 – Looking a point bank where sand deposit settled overtime.  

Page 108

 
 
Mitigation and Recommendation Next Steps, and Fall Plan 
Based on the field review and mapping, the following approach is recommended to address the 
identified sediment deposits while minimizing additional wetland and stream disturbance. 
1. Wetland Sediment Removal 
• Remove the mapped wetland deposits at the Northern Sand Deposit and Sumatra Pond Spillway 
areas using low-impact methods, preferably by hand when within 2” of natural grade and place 
spoil material in the stable vegetated upland areas away from potential water conveyances. Seed 
any upland areas disturbed by the work and allow mitigated areas to revegetate natural from 
seed bank.  
• Maintain the existing erosion and sedimentation controls during removal and continue rainfall-
based inspections. 
• Begin work while conditions remain dry and stable, but pause once winter or saturated/frozen 
ground conditions would result in additional rutting, compaction, or wetland disturbance. 
Complete remaining work under suitable spring conditions. 
2. Stable Upland Areas 
• Stable upland deposits shown on the mapping should remain in place and continue to be 
stabilized/revegetated. No additional excavation is recommended in these areas. 
3. Unamend Tributary to Salmon Brook / Watercourse Recommendation 
• Historical sand deposition is present in portions of the stream and adjacent riparian areas near 
the Sumatra Dam, including localized sand bars. The deposits have naturalized within the 
existing stream/riparian setting. 
• No sediment removal is recommended within the stream at this time. The flow is not impeded, 
and removal could alter the existing flow path and create new erosion or cut banks into finer 
streambank material. 
• Leave the stream undisturbed and continue to observe it during routine inspections, particularly 
after significant rainfall if sediment is departing the site. Reassess only if sediment 
accumulation, impeded flow, or channel instability is observed. 
4. Overall Recommendation 
• Proceed with targeted wetland sediment removal while conditions permit low-impact access; 
leave stable upland deposits in place; and leave stream sediment undisturbed unless a future 
field review identifies a clear functional or erosion concern. 
5. Fall 2026 Plan 
• Broadleaf is planning to a second seeding effort for fall. This work will include but not limited 
to, mowing existing cover crop, plowing in clippings, and reseeding the ground with another 
crop of rye or a similar annual species.  
• Continue monitoring based on rain events and take proactive measures by adding additional 
E&S measures (sediment traps and barriers) where appropriate to avoid potential soil transport 
and allow ground water infiltration.   

Page 109

Page 110

Page 111

Page 112

Page 113

Page 114

Page 115

K.A. / 2026-08-10          Page 1 
 MEMORANDUM 
 
 
 
TO:   Kathryn Malinowski 
   Environmental Analyst II 
   Water Planning and Management Division 
   Connecticut Department of Energy & Environmental Protection 
 
FROM:  Karl Acimovic, P.E. 
 
DATE:  August 10, 2026 
 
SUBJECT:  Case Street Dam 
   186 Case Street 
   West Granby, Connecticut 
   NOV No. DS-2025-1061V 
 
                                                                                                                                            
 
 The Case Street Dam, situated on the east side of Case Street in West Granby, 
was constructed for farming purposes. The current owner, Matthew Reale of 
Scottinaleece, LLC, has conferred with USDA in preparing an infrastructure and grazing 
plan for cattle on the subject property, though not in conjunction with the Dam Safety 
permitting process. It is the intent, through this correspondence, to initiate work on the 
preparation of an individual dam safety permit. 
 
 The dam and pond are located approximately 1,600 ft. east of Case Street along 
a wood road passing through open fields and wooded areas. A topographic survey of 
the site, along with the delineation of perimeter wetlands, has been completed and 
added to the plan. The drainage area for this site encompasses a wooded and rolling 
landscape approximately 0.11 sq. mi. in size. Based on photographs taken during 
construction, the dam was built with an impervious core within a cutoff trench, a 
reinforced concrete drop inlet structure and a low level outlet pipe from the structure to a 
downstream outlet point. The outlet pipe, a 42-inch HDPE with a corrugated exterior 
and smooth interior, is protected by an anti-seep collar situated approximately half-way 
between the upstream inlet and downstream discharge point.  
 
 The pond is intended to provide water for irrigation and consumption by onsite 
cattle livestock. It is part of the plan prepared by USDA to manage an area that may be 

Page 116

K.A. / 2026-08-10          Page 2 
broken up into individual paddocks where access to water will be required through water 
lines from the pond. 
 
 Based on watershed, proposed dam and pond size, and downstream conditions, 
we recommend a hazard rating of “A” for this dam site. Attached are the following: 
 
 (1) Location Map 
 (2) Watershed Map 
 (3) USDA Future Infrastructure Plan 
 (4) USDA Rotational Grazing Plan 
 
 Engineering work in progress includes further hydrologic and hydraulic 
assessments, validation of existing construction materials, design improvements and 
preparation of engineering plans and permit application. Based on your 
recommendation, we would also like to participate in a pre-application process to 
determine final requirements for permitting. 
 
 

Page 117

LOCATION MAP
CASE STREET DAM
WEST GRANBY, CONNECTICUT
SCALE: 1" = 2,000'
BASE MAP:  USGS 2026-08-10
CASE STREET
DAM
BARKHAMSTED
ROUTE   219
ROUTE 179
CASE STREET
GRANBY

Page 118

WATERSHED MAP
CASE STREET DAM
WEST GRANBY, CONNECTICUT
SCALE: 1" = 600'
BASE MAP:  USGS 2026-08-10
WATERSHED
0.11 SQ. MI.
CASE STREET
DAM
UNNAMED
STREAM
CASE STREET
FIELDING
WOODS ROAD

Page 119

1000 ft
N
➤➤
N
Image © 2025 Airbus
Image © 2025 Airbus
Image © 2025 Airbus

Page 120

 Connecticut Rotational 
Grazing Plan
CERTIFICATION OF PARTICIPANTS
   Telephone:
   Email Address:
Matt Reale
Coal Black Angus
                          Cover Sheet
This Grazing Plan Has Been Developed For:
2-  Grazing Manager:
1-  Farm Name:
July 2, 20264- Date:
   Farm Contact Address: 97 Daniel Trace Rd. Burlington, CT 06013
Nikki Bak
Prepared By:
   Telephone Number:
3- Planner Name:
nikki.bak@usda.gov
________________________  __________
Matt Reale Coal Black Angus     DATE

Page 121

Grazing Forage Balance and
Paddock Number Estimator Worksheet
Farm Name: Coal Black Angus
Prepared By: Nikki Bak
Date: July 2, 2026
5- Enter the type of grazing livestock: Beef (Feeder)
Notes:
6- Enter the Number of grazing livestock: 45
Notes:
7- Enter total acres available and planned 60.0 Acres                                         
     for grazing: Notes:
Dietary Data:
8- Enter average body weight of grazing livestock: 1,200 Pounds                                    
     (Table 1) Notes: avg weight = 1500 for adults 900 for  calves = 1200lbs
9- Enter estimated Dry Matter Intake (DMI) 2.5% DMI                                             
    as a % of body weight):        (Table 2) Notes: used % for stocker and heifer cattle to get an average
10-Calculate Daily DMI for a single animal: 30.0 Estimated Pounds of Dry Matter Intake Per Animal 
     ( 8 ) X ( 9 ) Notes:
11-Calculate Daily DMI for the herd:
     ( 6 ) X ( 10 ) 1350.0 Total Est. Pounds of Dry Matter Required / Day For The Herd
Notes:
Grazing Data:
12-Enter length of desired grazing period in days: 7.0 Days                                          
      (Table 3) Notes:
13-Enter estimated available forage dry matter in 1,200 Pounds per acre per day           
      pounds per acre :    (Table 4) Notes: go in at 8" and remove at 3" on avg density
14-Calculate estimated paddock size: 7.9 Acres                                          
      [( 11 ) / ( 13 )] X ( 12 ) 343,035
 Square Feet
15a-Enter Estimated paddock recovery period 42 Days                                           
        days:                        (Table 5)
15b-Calculate estimated number of paddocks 7 Estimated number of paddocks needed
        needed:       [( 15a ) / ( 12 )] + 1 Notes:
16-Calculate total acres needed for grazing: 55.1 Total estimated acres needed for the grazing plan.
      ( 14 ) / ( 15b ) Notes:
Paddock Acres = 7.9
Month  Estimated Rest Days Estimated # of Paddocks Needed
April 15 3
Estimated # of Acres Needed
24.8
Month  Estimated Rest Days Estimated # of Paddocks Needed
May 18 4
Estimates of Acres and Number of Paddocks Needed By Month
Note:  42 days rest period is the default for 
September.
2 of 7

Page 122

Grazing Forage Balance and
Paddock Number Estimator Worksheet
Estimated # of Acres Needed
28.1
Month  Estimated Rest Days Estimated # of Paddocks Needed
June 24 4
Estimated # of Acres Needed
34.9
Month  Estimated Rest Days Estimated # of Paddocks Needed
July 30 5
Estimated # of Acres Needed
41.6
Month  Estimated Rest Days Estimated # of Paddocks Needed
August 36 6
Estimated # of Acres Needed
48.4
Month  Estimated Rest Days Estimated # of Paddocks Needed
September 42 7
Estimated # of Acres Needed
55.1
References:    "Introduction To Management Intensive Grazing"        By: Bill Murphy
    "Greener Pastures on Your Side of the Fence"           By: Bill Murphy
    "Pasture Management"                                                    By: Sarah Flack
    "Pasture Condition Score Sheet"                                   By: Jim Cropper
3 of 7

Page 123

              For:
Farm Name: Coal Black Angus
Grazing Manager: Matt Reale
Contact Address: 97 Daniel Trace Rd. Burlington, CT 06013
Planning Assistance Provided By: Nikki Bak
FARM GRAZING GOALS: The goal of the farm operation is to increase grass forage production and 
yield, forage quality and diversity and provide for grass-forage feeding with 
minimal effort and cost.  This prescribed grazing plan will protect the soil 
and water and the  farm’s natural resources, improve forage production and 
herd health. 
LIVESTOCK GROUP 1
Number of Grazing Livestock: 45
Type of Grazing Livestock: Beef (Feeder)
Grazing Livestock Average Weight: 1200
Pasture Acres Available Group 1: 60.0
Grazing Acres Needed (Group 1): 55.1
LIVESTOCK GROUP 2
Number of Grazing Livestock:
Type of Grazing Livestock:
Grazing Livestock Average Weight:
Pasture Acres Available Group 2:
Grazing Acres Needed (Group 2):
55.1
Acres Needed
INVENTORY DATA
FARM INFRASTRUCTURE: Currently there is no infrastructure on the property. A 3 acre pond on site 
will to be used as a water source for cattle. The farm has plans to build a 
run-in shed on the western side of the property and build barns on the 
eastern side. Power will be brought to the site to the future barn. Access 
roads are essential to stablize the ground to bring livestock and equipment 
back and forth from the far pastures to the planned buildings. Fencing is 
needed along the access roadways to keep livestock along the roads 
during movement. 
PADDOCK INVENTORY: The primary limitations of the soils in this grazing system include concerns 
with stoniness, areas of high runoff without adequate vegetative cover, and 
areas of bedrock with potential summer moisture deficiency.
FORAGE INVENTORY DATA: Land is currently being converted from a forest setting to pasture. After 
taking soil samples and applying the recommended soil amendments, seed 
new pastures with a forage mix. 
Total Acres Needed For The 
Grazing Plan:
GRAZING PLAN
Page 4 of 7

Page 124

              For:
GRAZING PLAN
LIVESTOCK EXCLUSION 
REQUIREMENTS:
Livestock will not have access to flowing surface waters or standing water 
in wetlands or low areas anytime water is present unless it is by controlled 
access according to NRCS conservation practices.  For low areas this is 
usually only during the early spring (March, April and May).  This will help 
maintain these fields as productive pasture and prevent potential polluted 
runoff from reaching surface waters (streams) or groundwater.  The 
livestock will only be allowed to access these fields when all surface water 
has drained away.  This will improve water quality and improve animal 
health.  
MANURE AND NUTRIENT 
MANAGEMENT:
Management of the manure and nutrients will be done primarily by the 
rotation of cattle and with proper placement of water tubs and supplied 
minerals.  Soil test(s) will be taken to determine the economic threshold of 
applying fertilizer to increase production.  The pH levels may also indicate 
lime is needed to neutralize the soil.  Soil tests should be taken every three 
years.  Apply nitrogen when needed to increase production for fall pasture.  
Implementation of the rotational grazing system will spread manure 
throughout the pasture.  Sacrifice or winter paddocks will be seeded to a 
cover crop for summer pasture and to take up excess nutrients or will be 
excluded from grazing until the forage has completely recovered.
EXISTING OR PLANNED WATER 
SYSTEM:
The watering system will include new pond as the water source, with pump,  
pipeline, and movable water tubs with floats.    
Emergency Watering: In the case of an emergency, such as power failure, 
pump failure, etc. the livestock will be provided water by:  
a) providing open access to surface waters, however, access will 
immediately cease as soon as the emergency is over.
b) hauling water from existing water sources to grazing animals.
EXISTING OR PLANNED FENCES: Exterior Fencing:  The  proposed exterior fence will be maintained to 
prevent grazing livestock from getting out of the pasture and into the 
road,neighboring property, or into water sources.  Interior fences can be 
used to break up pastures into smaller paddocks to allow for rotational 
grazing. 
ADDITIONAL PLAN  INFORMATION
Page 5 of 7

Page 125

              For:
GRAZING PLAN
DROUGHT CONTINGENCY PLAN: The “summer slump” for cool season grasses and legumes (very slow or no 
growth) occurs as summer air temperatures increase with simultaneous 
decreases in rainfall.  During this period, the manager will need to 
supplement with forages (hay) at this time and should follow a plan to meet 
the requirements of the livestock while still protecting the plants until this 
summer slump ends.  The following Drought Contingency Plan will be used:
During periods of drought when forage production is significantly reduced, 
the livestock manager will:
• reduce herd size or increase paddock size, OR
• rotate the livestock through the grazing system at a “slower” than normal 
pace, OR
• put the livestock in a “sacrifice” paddock to take the abuse while other 
paddocks rest and avoid forage damage, OR
• feed a supplemental forage supply such as hay in a sacrifice paddock until 
the drought ends.
A long drought may require all of the above to be implemented. 
MUD CONTINGENCY PLAN: When grazing conditions are very wet the following Mud Contingency Plan 
will be used. 
• Rotate the livestock through the grazing system at a “faster” than normal 
pace, or 
• put the livestock in a “sacrifice” paddock of favorable soil type to take the 
brunt of the abuse to allow other paddocks a chance to avoid damage, or
• change the paddock order in the rotation schedule to avoid muddy 
situations
There may be situations where all three of the above will be implemented 
during a long wet period.
WINTER PLANS: After the grazing season is complete and winter weather moves into the 
area, the livestock will be managed in the following manner:
a) Livestock will be rotated among winter pasture/paddock areas near the 
headquarters.   Feed will be brought to the livestock at these locations.  A 
freeze-proof water source should be provided.  The winter sacrifice 
paddocks will be chosen due to low runoff potential, level topography and 
well-drained soils.  The paddocks will be soil tested every year after 
livestock move out to the other paddocks in the spring.
b) Livestock will be confined and the manager will store the manure from 
(November 1 to April 1, e.g.) in an approved stacking area.
Page 6 of 7

Page 126

              For:
GRAZING PLAN
EXCESS PASTURE PLANS: The fields will be hayed, or at least clipped, if the forage is growing at rates 
that exceed grazing rotation of the livestock.  By haying the excess forage 
off of the fields during peak times, the forage production of the whole 
system will be maintained. If pasture is not accessible by tractor, priority 
should be given to graze those areas first. The grazing system should be 
created with priority given to graze inaccesible pastures. Thus, if pastures 
are getting ahead of the grazing system, accessible fields can be easily 
clipped and/or hayed, and forage waste is minimized.
GRAZING SCHEDULE:
Livestock Group 1
GRAZING DAYS / PADDOCK: 7
REST PERIOD / PADDOCK: 42
PLANNED PADDOCK SIZE AC: 7.9
PLANNED # OF PADDOCKS 7
Livestock Group 2
GRAZING DAYS / PADDOCK:
REST PERIOD / PADDOCK:
PLANNED PADDOCK SIZE AC:
PLANNED # OF PADDOCKS:
MONITORING AND RECORD 
KEEPING PLANS:
The key forages will be measured by weekly observation, by weekly grazing 
stick checks, or by other means to note changes in plant composition, plant 
diversity, yield, and plant density.  Records of weekly observations will be 
documented and retained, as well as records of livestock movement 
through the grazing system.
PLANNED PRACTICE 
INFORMATION:
Optimum Average Height to Graze Forage Species present:         8 inches
Maximum Average Height to Graze (taller than this make hay):   12 inches 
Minimum Average Grazing Height (do not graze lower than):        3 inches
          Note:  Grazing should begin in a different paddock at the beginning of each grazing season.  
Page 7 of 7

Page 127

Page 128

Page 129

  

Minutes: archived copy, SHA-256 1a75bdf8608c…. Agenda: archived copy, SHA-256 53ba21c1420d…. Packet: kept offline, SHA-256 13e3c0a7a959….