Inland Wetlands & Watercourses Commission, Sep 9, 2026

Granby minutes posted

Documents

TypeDocumentPagesOpen
minutes IWWC Minutes 4 PDF download · town site
agenda IWWC Agenda 1 PDF download · town site
packet IWWC Meeting Packet
Not attached: this packet is 62 MB, too large to host here. Use the town site link.
120 town site

Summary of the minutes

AI-generated summary. Each line links to the PDF page it came from; check it before relying on it.

Read the official minutes (PDF, 4 pages) The PDF is the record; this summary is a guide to it.

The Granby Inland Wetlands and Watercourses Commission approved the August 12, 2026 minutes and continued several applications, including the 37 Hartford Avenue public hearing, to the next regular meeting. It also ruled that a farming activity at 90 Salmon Brook and 35 Floydville Road is as of right, and it received and continued the Town of Granby walking path permit application.

Decisions (8) · all reported votes

  1. Approval of August 12, 2026 Meeting Minutes
    Approved as presented; J. Laudati and S. Okie abstained.
    Vote: Motion by D. Tolli, seconded by S. Okie, carried 4-0-0 · p. 1
  2. 37 Hartford Avenue – F. Devine – Permit application for regulated activities (16-unit apartment building)
    Public hearing continued to the next regular meeting on October 14, 2026, at the request of Ron Levesque of R Levesque Associates, Inc.
    Vote: Motion by S. Okie, seconded by B. Schmitt, carried 6-0-0 · p. 1, p. 2
  3. 7 Laurel Drive – C. Fontaine and R. Weiner – Show Cause Hearing for regulated activity without a valid IWWC Permit
    Application received and continued to the next regular meeting.
    Vote: Motion by D. Tolli, seconded by S. Okie, carried 6-0-0 · p. 2
  4. 12 Northwoods Road – N. Kimball and M. Nasshan – Request for Review for pond maintenance
    Application received and continued to the next regular meeting; applicants directed to calculate total volume of disturbed area, consider a pumping and diversion plan, and locate a stockpile or spread location onsite.
    Vote: Motion by D. Tolli, seconded by B. Schmitt, carried 6-0-0 · p. 2
  5. 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – Request for Review for mitigation and site stabilization
    Commission determined the proposed activity is As of Right under the farming provision in Section 4.1a.
    Vote: Motion by S. Okie, seconded by D. Tolli, carried 6-0-0 · p. 3
  6. 53 West Granby Road and 215 Salmon Brook Street – Town of Granby – Permit application for walking path within regulated area
    Application received and continued to the next regular meeting. Project includes a 1,514-foot bituminous path, a 630-foot stone dust path with stairs, and 15,000 square feet of wetland (floodplain) area disturbed, of which 9,960 square feet is temporary.
    Vote: Motion by D. Tolli, seconded by N. Dethlefsen, carried 6-0-0 · p. 3
  7. 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Agent update on regulated activity without a valid IWWC Permit
    Item continued to the next regular meeting; property owner directed to provide boundaries of disturbance, a wetland delineation, and a mitigation plan for the entire site.
    Vote: Motion by D. Tolli, seconded by B. Schmitt, carried 5-0-0 · p. 3, p. 4
  8. Adjournment
    Meeting adjourned at 9:58 p.m.
    Vote: Motion by N. Dethlefsen, seconded by B. Schmitt, carried 4-0-0 · p. 4

Also discussed (1)

  • 54 Hartford Avenue – B. Richard – Permit request for 14’x24’ prefabricated shed (Authorized Agent approval 9/4/26): Agent update only; no Commission action recorded. Agent reported on bridge installation at 15 Peck Orchard Road, stating everything was in good order. · p. 4
Summary of the agenda: IWWC Agenda

AI-generated summary.

This is the Granby Inland Wetlands and Watercourses Commission agenda for its September 9, 2026 regular meeting. It lists public hearings, a show cause hearing, requests for review, a permit request, and agent and commissioner reports.

On the agenda (9)

  1. Action on the August 12, 2026, Meeting Minutes · p. 1
  2. Public Hearing: 37 Hartford Avenue – F. Devine – Permit application for regulated activities in connection with the development of a 16-unit apartment building and associated site improvements (opened and continued from 7/8/26) · p. 1
  3. Show Cause Hearing: 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a Regulated Activity without a valid IWWC Permit (opened and continued from 7/8/26) · p. 1
  4. Request for Review: 12 Northwoods Road – N. Kimball and M. Nasshan – RFR to conduct pond maintenance · p. 1
  5. Request for Review: 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – RFR for mitigation and site stabilization within a regulated area · p. 1
  6. Permit Request: 53 West Granby Road and 215 Salmon Brook Street – Town of Granby – Permit application to construct a walking path and associated improvements within a regulated area · p. 1
  7. Agent Report: Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated Activity without a valid IWWC Permit · p. 1
  8. Agent Report: 54 Hartford Avenue – B. Richard – Permit request to construct a 14’x24’ prefabricated shed on crushed stone within a regulated area. Authorized Agent approval 9/4/26: ; agent approval noted as 9/4/26 · p. 1
  9. Passage 1: Materials for display deadline (10 AM email, no late materials): Procedural notice on materials for video display; no decision recorded · p. 1

Full text of the documents

View the minutes PDF on this page (IWWC Minutes) Open the PDF
Text of the minutes (IWWC Minutes, 4 pages)

Page 1 · open in PDF

 
1 
MEETING MINUTES 
Town of Granby 
Inland Wetlands and Watercourses Commission 
Wednesday, September 9, 2026, at 7:00 p.m. 
 
PRESENT: Nick Dethlefsen, David Tolli, Sue Okie, John Laudati, Barbara Schmitt, and Fred 
Jones (via Zoom) 
ALSO PRESENT: IWWC Agent Kate Bednaz and Land Use Coordinator Renee Deltenre 
 
1. Call to Order 
Chair J. Laudati called the meeting to order at 7:00 p.m. 
 
2. Action on the August 12, 2026, Meeting Minutes 
 
ON A MOTION by D. Tolli, seconded by S. Okie, the Commission voted 4-0-0 to approve 
the August 12, 2026, minutes as presented. J. Laudati and S. Okie abstained. 
 
3. Public Hearings 
a. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in 
connection with the development of a 16-unit apartment building and associated site 
improvements.  
Professional Engineer Rebecca Li was present to discuss the application. Since the last 
meeting in August, septic approval was received from the CT Department of Public 
Health and Farmington Valley Health District. R. Li provided additional application 
material, which consisted of a project timeline and map of the project area indicating 
septic system locations for the abutting properties. K. Bednaz provided her latest review 
comments, indicating that all concerns have been addressed and it is her opinion that the 
functions and values of the existing wetlands system will not be impacted by this 
development.  
 
Public Comment 
Attorney George Schober spoke on behalf of his client Peter Voskowsky, who is an 
abutting property owner. He requested a continuance of the public hearing so that 
Professional Engineer Steve Trinkaus may have time to review the newly submitted 
material. Attorney Schober proposed feasible and prudent alternatives, such as 
connecting to public sewer or reducing the unit count and expressed concerns regarding 
hydrology and contamination.  
 
Reinhard Maier, 138 Day Street, had concerns regarding the proposed septic and leaching 
system as it pertains to nitrogen dilution and groundwater pollution. 
 
Robert Flanigan, 24 Woodcliff Drive, expressed concerns regarding potential wetlands 
contamination due to seepage of effluent, as well as surface treatment of the parking lot 
during the winter months. 
 

Page 2 · open in PDF

 
2 
Maureen Eberly, 37 Silkey Road, questioned the legitimacy of the test pit results, 
invasive species located on site and stated that the development shall connect to public 
sewer.  
 
Ron Levesque of R Levesque Associates, Inc. spoke on behalf of the project and 
submitted a formal request to continue the public hearing to the next regular meeting on 
October 14, 2026.  
 
ON A MOTION by S. Okie seconded by B. Schmitt, the Commission voted 6-0-0 to 
continue the public hearing to the next regular meeting.  
 
4. Show Cause Hearing 
a. 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a Regulated Activity 
without a valid IWWC Permit.  
Professional Engineer TJ Barresi, as well as property owners Colleen Fontaine and Ross 
Weiner were present to discuss their application, which was submitted in response to the 
Enforcement Order issued on 7/2/26. The property owners are seeking permission to 
install an 18” drainage pipe, re-establish a grass line swale, remove six pine trees, place a 
prefabricated shed, install a split-rail fence and restore the existing lawn within a 
regulated area. Discussion ensued regarding the Enforcement Order from the prior 
owners and how the situation was resolved prior to the sale of the home. K. Bednaz 
provided feedback on the application, requesting that the elevations be checked and the 
mitigation plan consist of a 1:1 wetland restoration ratio.  
 
ON A MOTION by D. Tolli seconded by S. Okie, the Commission voted 6-0-0 to 
receive and continue the application to the next regular meeting.  
 
5. Request for Review 
a. 12 Northwoods Road – N. Kimball and M. Nasshan – RFR to conduct pond 
maintenance. 
Applicants/property owners Nicholas Kimball and Marissa Nasshan were present to 
discuss their request for review. They are seeking permission to remove sediment and 
overgrown vegetation from an existing fire pond on their property. Over the summer 
large volumes of rainwater and sediment have accumulated, thus encouraging the rapid 
growth of vegetation that is hindering stream flow and potential backup at the existing 
culvert. The subject area is approximately 40 square feet, and an excavator would be 
utilized from the driveway to remove the material. K. Bednaz provided feedback on the 
application, noting that additional information is required. The applicants were directed 
to calculate the total volume of disturbed area, which will determine if an IWWC permit 
is required, consider a pumping and diversion plan, and locate a suitable location to 
stockpile or spread the sediment onsite.   
 
ON A MOTION by D. Tolli seconded by B. Schmitt, the Commission voted 6-0-0 to 
receive and continue the application to the next regular meeting.  
 

Page 3 · open in PDF

 
3 
b. 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – RFR for 
mitigation and site stabilization within a regulated area.  
Aaron Svedlow of Greenfield Development and Kevin Sullivan were present on behalf of 
Broadleaf Solar to discuss the application. K. Sullivan explained that sorghum was 
planted to establish a cover cop that would address erosion issues and stabilize the area. 
In due time, the existing crop will either be mowed and left as a thatch, or it may be 
mowed down and tilled into the soil to establish another crop. K. Bednaz provided a brief 
overview of the project, noting a failure among the erosion and sedimentation controls 
last month. 218 acres were tilled and planted, and silt fence and waddles were also 
installed to help control erosion. K. Bednaz indicated that an IWWC Permit is required to 
address the aftermath of the erosion, detailing how much sediment was removed, where it 
was deposited, how it will be removed, a mitigation plan, and timeline.  
 
ON A MOTION by S. Okie seconded by D. Tolli, the Commission voted 6-0-0 that the 
proposed activity is As of Right under the farming provision in Section 4.1a. 
 
6. Permit Requests 
a. 53 West Granby Road and 215 Salmon Brook Street – Town of Granby – Permit 
application to construct a walking path and associated improvements within a 
regulated area. 
K. Bednaz presented the application on behalf of the Town of Granby, which was 
received by the Commission this evening. The proposal consists of constructing a 
pedestrian walking path from the parking lot located at 53 West Granby Road to the 
soccer fields located at 215 Salmon Brook Street (Salmon Brook Park). The path will be 
constructed in the same location of the existing woods trail and consists of a series of 
stairs to address the steep slope. The total project area is approximately 25,580 square 
feet and will have a five-foot wide, 1,514-foot bituminous concrete path within the 
existing grass area and a six-foot wide, 630-foot stone dust path with stairs within the 
woods. Approximately 1,600 feet of bituminous walk will be located in wetland 
(floodplain) soils, and the reconstructed woods path will cover approximately 2,722 
square feet of wetlands/regulated area. In addition, a total of 15,000 square feet of 
wetland (floodplain) area will be disturbed; of which 9,960 square feet will be temporary. 
 
ON A MOTION by D. Tolli seconded by N. Dethlefsen, the Commission voted 6-0-0 to 
receive and continue the application to the next regular meeting.  
 
J. Laudati left the meeting at 9:15 p.m. 
 
7. Agent Report and Correspondence 
a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – 
Conducting a Regulated Activity without a valid IWWC Permit. 
Attorney Timothy Furey was present on behalf of the property owner to provide updates, 
along with Soil Scientist David Lord who addressed comments raised at the prior 
meeting. Attorney Furey noted that revised drawings were recently submitted to DEEP 
from Professional Engineer Karl Acimovic and Robert Green Associates, LLC. D.  

Page 4 · open in PDF

 
4 
Lord discussed existing conditions related to soil erosion and sedimentation, as well as 
existing wetlands in the paddock areas. K. Bednaz reiterated that an existing conditions 
and comprehensive mitigation plan for the areas outside of DEEP’s jurisdiction has not 
been submitted. Since no mapped wetlands delineation has been provided, she requested 
a meeting on-site to view and discuss the flagged wetlands in order to move things 
forward. In advance of the next meeting, the property owner was directed to provide the 
boundaries of disturbance, along with a wetland delineation and mitigation plan for the 
entire site. 
 
ON A MOTION by D. Tolli seconded by B. Schmitt, the Commission voted 5-0-0 to 
continue this agenda item to the next regular meeting. 
 
F. Jones left the meeting at 9:54 p.m. 
 
b. 54 Hartford Avenue – B. Richard – Permit request to construct a 14’x24’ 
prefabricated shed on crushed stone within a regulated area. Authorized Agent 
approval 9/4/26. 
 
K. Bednaz provided an update regarding the bridge installation at 15 Peck Orchard Road, 
stating that everything was in good order. 
 
8. Commissioner Reports and Correspondence 
None 
 
9. Adjourn 
 
ON A MOTION by N. Dethlefsen seconded by B. Schmitt, the Commission voted 4-0-0 to 
adjourn the meeting at 9:58p.m. 
 
Respectfully submitted, 
 
 
 
Renee Deltenre 
Land Use Coordinator 
 
 
 
View the agenda PDF on this page (IWWC Agenda) Open the PDF
Text of the agenda (IWWC Agenda, 1 page)

Page 1 · open in PDF

Town of Granby 
Inland Wetlands and Watercourses Commission 
Regular Meeting Agenda 
Wednesday, September 9, 2026, at 7:00 pm 
Town Hall Meeting Room 
 
Please note: Any person who wishes to provide materials for display on the video monitors at an IWWC meeting where such 
monitors are being used to video conference the meetings must email the materials no later than 10 AM on the day of the 
meeting. All materials must be contained in a single attachment to the email.  Materials received after the 10 AM deadline will 
not be accepted for display. Display of the materials is subject to all other rules and procedures of the IWWC. Zip drive, memory 
sticks and other data storage devices will not be accepted. 
Zoom: https://us06web.zoom.us/j/88097165233?pwd=BeaLXJaV2bhzELdbzFhI2QZs2Ne0un.1 
Call In: 929-205-6099 
Meeting ID: 880 9716 5233 
Passcode: 244134 
 
1. Call to Order 
 
2. Action on the August 12, 2026, Meeting Minutes 
 
3. Public Hearings 
a. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in 
connection with the development of a 16-unit apartment building and associated site 
improvements. (Hearing opened and continued from 7/8/26) 
 
4. Show Cause Hearing 
a. 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a Regulated Activity without a 
valid IWWC Permit. (Hearing opened and continued from 7/8/26) 
 
5. Request for Review 
a. 12 Northwoods Road – N. Kimball and M. Nasshan – RFR to conduct pond maintenance. 
 
b. 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – RFR for 
mitigation and site stabilization within a regulated area.  
 
6. Permit Requests 
a. 53 West Granby Road and 215 Salmon Brook Street – Town of Granby – Permit 
application to construct a walking path and associated improvements within a regulated 
area. 
 
7. Agent Report and Correspondence 
a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a 
Regulated Activity without a valid IWWC Permit. 
 
b. 54 Hartford Avenue – B. Richard – Permit request to construct a 14’x24’ prefabricated 
shed on crushed stone within a regulated area. Authorized Agent approval 9/4/26. 
 
8. Commissioner Reports and Correspondence 
 
9. Adjourn 
 
 
Text of the packet (IWWC Meeting Packet, 120 pages)

Page 1

Town of Granby 
Inland Wetlands and Watercourses Commission 
Regular Meeting Agenda 
Wednesday, September 9, 2026, at 7:00 pm 
Town Hall Meeting Room 
 
Please note: Any person who wishes to provide materials for display on the video monitors at an IWWC meeting where such 
monitors are being used to video conference the meetings must email the materials no later than 10 AM on the day of the 
meeting. All materials must be contained in a single attachment to the email.  Materials received after the 10 AM deadline will 
not be accepted for display. Display of the materials is subject to all other rules and procedures of the IWWC. Zip drive, memory 
sticks and other data storage devices will not be accepted. 
Zoom: https://us06web.zoom.us/j/88097165233?pwd=BeaLXJaV2bhzELdbzFhI2QZs2Ne0un.1 
Call In: 929-205-6099 
Meeting ID: 880 9716 5233 
Passcode: 244134 
 
1. Call to Order 
 
2. Action on the August 12, 2026, Meeting Minutes 
 
3. Public Hearings 
a. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in 
connection with the development of a 16-unit apartment building and associated site 
improvements. (Hearing opened and continued from 7/8/26) 
 
4. Show Cause Hearing 
a. 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a Regulated Activity without a 
valid IWWC Permit. (Hearing opened and continued from 7/8/26) 
 
5. Request for Review 
a. 12 Northwoods Road – N. Kimball and M. Nasshan – RFR to conduct pond maintenance. 
 
b. 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – RFR for 
mitigation and site stabilization within a regulated area.  
 
6. Permit Requests 
a. 53 West Granby Road and 215 Salmon Brook Street – Town of Granby – Permit 
application to construct a walking path and associated improvements within a regulated 
area. 
 
7. Agent Report and Correspondence 
a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a 
Regulated Activity without a valid IWWC Permit. 
 
b. 54 Hartford Avenue – B. Richard – Permit request to construct a 14’x24’ prefabricated 
shed on crushed stone within a regulated area. Authorized Agent approval 9/4/26. 
 
8. Commissioner Reports and Correspondence 
 
9. Adjourn 
 
 

Page 2

Page 3

 
1 
MEETING MINUTES 
Town of Granby 
Inland Wetlands and Watercourses Commission 
Wednesday, August 12, 2026, at 7:00 p.m. 
 
PRESENT: Nick Dethlefsen, Vickie Dirienzo, Fred Jones, Barbara Schmitt, and David Tolli 
ALSO PRESENT: IWWC Agent Kate Bednaz 
 
1. Call to Order 
Acting Chair V. Dirienzo called the meeting to order at 7:00 p.m. 
 
2. Action on the July 8, 2026, Meeting Minutes 
 
ON A MOTION by D. Tolli, seconded by B. Scmitt, the Commission voted 4-0-1 to 
approve the July 8, 2026, minutes as presented. V. Dirienzo abstained. 
 
3. Permit Requests 
a. 5 Godard Road – H. Werner and S. Werner – Permit request to construct a single-
family home and detached garage with associated site improvements within a 
regulated area. 
S. Werner, 5 Godard Road, reported she has been in touch with the Wetlands Agent, and 
all outstanding items have been addressed and are reflected in the revised plans. K. 
Bednaz provided an overview of the plans, explaining the changes. S. Werner noted that 
Farmington Valley Health District approved the septic system design. A draft approval 
letter was provided to the Commission for review. K. Bednaz stated for the record the 
proposed conditions of approval, which include the regulated area that will be marked on 
site; pond maintenance and repair will be addressed as part of the house construction; a 
mylar of the as-built will be filed; and a bond will be submitted. 
 
ON A MOTION by F. Jones, seconded by N. Dethlefsen, the Commission voted 5-0-0 to 
approve the application and approval letter as presented. 
 
b. 215 Salmon Brook Street – Town of Granby – Permit request to construct a gazebo 
on a concrete pad within a regulated area.  
K. Bednaz provided an overview of the application, noting this was received at the 
Commission’s July meeting. The project includes the installation of a concrete pad and 
construction of a gazebo. It was also noted the project includes the installation of eight 
concrete pads adjacent to the walking path to accommodate benches. The Commission 
reviewed the draft approval letter with the standard conditions of approval. 
 
ON A MOTION by F. Jones, seconded by B. Schmitt, the Commission voted 5-0-0 to 
approve the application and approval letter as presented. 
 
4. Request for Review 
a. 90 Salmon Brook Street and 35 Floydville – J. Gravel c/o Broadleaf Solar – RFR to 
address pre-existing soil/erosion concerns and establish a vegetative cover.  

Page 4

 
2 
J. Gravel, representing Broadleaf Solar, presented to the Commission. He explained the 
site had some erosion issues so they thought it would be best to establish a cover crop to 
help stabilize the site. Working with Kevin Sullivan, sorghum was planted, which in 
addition to stabilizing the area, helps add nutrients. Silt fence and waddles were also 
installed to help control erosion. In response to a question, it was noted that the crop may 
be mowed down and left as a thatch or it may be mowed down then folded back into the 
soil to establish another crop. Both approaches would prevent erosion. K. Bednaz 
provided information about the site visit and further explained the request for review. It 
was also noted while on site, the breach of erosion controls was observed. The applicant 
will work on a plan to address and correct this. In response to a question, J. Gravel 
provided an overview of the siting council process to date. 
 
ON A MOTION by B. Schmitt, seconded by D. Tolli, the Commission voted 5-0-0 that 
the proposed activity is as of right under the farming provision in Section 4.1a. 
 
5. Public Hearings 
a. 199 Broad Hill Road – T. Kurnicki – Permit request to construct a single-family 
home with associated site improvements within a regulated area. (Hearing opened 
and continued from 7/8/26) 
T. Kurnicki presented to the Commission. He explained that there were changes to the 
plans in response to the comments, including the protection of the steep slope. The slope 
will remain as is and only those areas in proximity to the house and septic would be 
disturbed. A planting schedule with native plants and shrubs was included to limit 
potential erosion around the driveway and other disturbed areas. Removal of invasive 
species will be included as part of the project as well. In response to a question, it was 
explained that there is an existing driveway that will be regarded to access the property. 
The Commission noted that the proposed size of the trees may be problematic in terms of 
the root ball and disturbed area; it was suggested that smaller trees be planted. 
There were no comments from the public. 
 
The Commission reviewed the draft approval letter that was revised after the packet was 
posted. Changes include an increase in the bond amount to $2,000. It was also noted that 
there may be an eastern box turtle habitat on the property, which is reflected in the draft 
approval letter. The Commission discussed invasive species. It was agreed that condition 
14 should be added to the letter, which states, “Invasive species within the wetland 
resource area shall be removed without soil disturbance.” It was noted that on Sheet 9, 
the note about invasive species shall be changed to include removal of species within the 
wetland area. The public hearing was closed. 
 
ON A MOTION by F. Jones, seconded by N. Dethlefsen, the Commission voted 5-0-0- 
to approve the application and approval letter as revised with the 14 conditions. 
 
b. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in 
connection with the development of a 16-unit apartment building and associated site 
improvements. 

Page 5

 
3 
Professional Engineer Rebecca Li was present to discuss the application. Since the last 
meeting in July, the plan set was revised to reflect staff comments. It was noted that Sean 
Merrigan with CT Department of Public Health was unable to review the revisions before 
leaving for vacation. However, the revised plans were submitted to town staff for review. 
R. Li went through the response memo, noting how all staff comments were addressed on 
the revised plan set, starting with the Town Engineer comments. It was noted the Town 
Engineer confirmed the plan set addresses his comments. R. Li the continued with the 
Wetlands Agent comments. 
 
The Commission questioned the requirement for nitrogen dilution calculations for the 
septic system. R. Li noted that this assessment is not required under the technical 
standards for a system this size but given the history of this site, the information was 
submitted and the calculations show the project is under the 10 milligrams per liter for 
the drinking water standard. She also stated that the septic system has been moved as 
close to the road as possible. The Commission questioned the proposed trees on the slope 
and at the bottom of the slope. Plantings along the parking lot were also discussed and 
pruning practices were questioned. The Commission also discussed invasive species 
management on the site and the proposed methods to address them. 
 
Public Comment 
Attorney George Schober, Enfield, spoke on behalf of his client Peter Voskowsky, who is 
an abutting property owner. He also introduced Steve Trinkaus, Professional Engineer.  
He explained his client is concerned with the potential for effluent to seep onto his 
property and submitted a petition for intervention, stating they are able to cross examine 
and rebut what is presented. A letter from S. Trinkaus was also provided. Attorney 
Schober raised concerns regarding feasible and prudent alternatives  
 
S. Trinkaus provided information about his background and expertise. He noted two 
major issues with the subject application, the septic system and the stormwater system. It 
was stated that with a site like this, there is fast moving water through the gravel, so it 
takes a large distance for bacteria and viruses in the effluent to die off. According to his 
calculations, it was stated it results in 35 milligrams per liter, over three times the 
recommended 10 milligrams per liter. He stated his calculations also show a distance of 
332 feet are needed but the system is 54 feet from the road, so it is his opinion there will 
be groundwater pollution. For the stormwater system, the proposed system will not 
remove nitrogen, and it will run downhill, entering the wetland boundary. He further 
explained the necessary process to remove nitrogen and then discussed concerns 
regarding surface treatment during the winter months and potential pollutants. There is 
not enough data to determine groundwater levels and direction of flow. 
 
Peter Voskowsky, 53 Windmill Drive, is an abutting property owner and discussed the 
site conditions of his property at 39R Hartford Avenue, including existing seeps, wetland 
characteristics, high groundwater levels, etc. 
 
K. Bednaz requested that the applicant consult with NDDB due to the proximity of the 
proposed development to existing habitats and provided clarification regarding the septic 

Page 6

 
4 
design and difficulties/feasibility of connecting to public sewer. She noted that the 
adjacent properties are functioning properly off septic systems and surrounding wetlands 
are healthy.  
 
Reinhard Maier, 138 Day Street, questioned the design of the proposed septic and 
leaching system, stating comparisons between the prior Vessel application and what is 
currently proposed. 
 
Robert Flanigan, 24 Woodcliff Drive, expressed concerns regarding potential wetlands 
contamination on the abutting property and questioned the connection to public sewer.  
 
R. Li requested a continuance of the public hearing to the next regular meeting on 
September 9, 2026.  
 
ON A MOTION by B. Schmitt, seconded by N. Dethlefsen, the Commission voted 5-0-0 
to continue the public hearing to the next regular meeting.  
 
ON A MOTION by B. Schmitt, seconded by N. Dethlefsen, the Commission voted 5-0-0 to take a 
5-minute recess at 9:10 p.m. 
 
6. Show Cause Hearing 
a. 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a Regulated Activity 
without a valid IWWC Permit. 
Property owner Colleen Fontaine was present to provide updates and noted that a site 
walk with K. Bednaz was conducted on 8/7/26 to verify that the required plantings from 
the prior Enforcement Order were installed and surviving. At this time, the owners are 
working with TJ Barresi to develop a mitigation plan that will address drainage concerns 
while maintaining the wetlands resource area. The Enforcement Order was upheld and 
continued to the next regular meeting.  
 
7. Agent Report and Correspondence 
a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – 
Conducting a Regulated Activity without a valid IWWC Permit. 
Soil Scientist David Lord was present to discuss the wetlands delineation and noted that 
the limits of the wetland delineation relative to the proposed pond has been the focus of 
his efforts to this point. The wetland delineation of the corridor where the pond is 
proposed extends from the northern boundary to the southern boundary. He provided an 
overview of the delineation, soil types, flagged locations, etc. The property owner is 
looking to create a 2.5-acre pond with surrounding pasture areas for livestock. Two small 
wetlands along the northern property boundary off case street were identified; however 
not flagged, as there are no proposed activities within that area. K. Bednaz had concerns 
regarding pre-existing conditions, as no delineation or mapping has been provided to 
indicate site conditions prior to site disturbance by the property owner. At this point, the 
Commission has not received the necessary documentation as outlined within the 
Enforcement Order, and majority of focus has been placed on the pond/dam area.  

Page 7

 
5 
A mitigation plan must be provided for the area beyond the pond, as the remainder of the 
site has not been addressed. It was also noted that legal council will be sought if no 
progress is made. K. Bednaz stated that an existing conditions plan shall be submitted 
within the next two weeks, detailing impact areas, what materials will be removed and/or 
deposited, corrective measures and timeline, handling of slash, etc. Property owner Matt 
Reale questioned the keeping of livestock within a wetland area, to which staff stated her 
opinion that cows should be located outside of any wetland resource area. K. Bednaz also 
stated that the proposed farming activities are a separate matter, and the Enforcement 
Order needs to be addressed first. M. Reale requested clarification on the items outlined 
within the Enforcement Order and indicated that working with NRCS has made his 
project more stringent.  
 
b. 55 Northwoods Road – M. Fusick – Permit request to construct a 32’ x 24’ detached 
garage with underground electrical within a regulated area. Authorized Agent 
approval 07.16.26 
 
c. 17 Farmview Lane – S. Bernabucci c/o Juliano’s Pools – Permit request to install an 
18’ x 36’ inground swimming pool inclusive of patio and associated site 
improvements within a regulated area. Authorized Agent approval 07.17.26 
 
d. 13 & 14 Evangeline Place – Town of Granby – Permit request to install a storm 
drainage system as part of re-paving project. Authorized Agent approval 07.21.26 
 
K. Bednaz stated that she conducted a site visit at the Station 280 Apartment Complex to 
confirm the location of the excess scheduled plantings to the area where trash debris has been 
an issue. 
 
8. Commissioner Reports and Correspondence 
None 
 
9. Other Correspondence 
None 
 
10. Adjourn 
 
ON A MOTION by F. Jones seconded by N. Dethlefsen, the Commission voted 5-0-0 to 
adjourn the meeting at 9:51p.m. 
 
Respectfully submitted, 
 
 
 
Renee Deltenre 
Land Use Coordinator 
 

Page 8

Page 9

 
 
 
 
 
Environmental Engineering Program 
410 Capitol Ave. 
P.O. Box 340308, MS #12SEW 
Hartford, CT  06134 
DPH.EnvironEng@ct.gov 
ct.gov/dph 
Department of Public Health 
Regulatory Affairs Branch 
 
 
 
 
 
 
 
September 2, 2026 
 
Kristin Kula, RS 
Farmington Valley Health District (FVHD) 
95 River Road, Suite C 
Canton, CT 06019 
 
RE: 37 Hartford Avenue - Granby, CT 
 
Dear Mrs. Kula: 
 
We have received plans for the installation of subsurface sewage disposal system (SSDS) 
at 37 Hartford Avenue in Granby, CT.   The SSDS shall serve a 29-bedroom residential 
apartment building with a proposed daily design flow of 3,700 GPD.   Plans were prepared 
by Rebecca Li, P.E. and submitted to our office for review pursuant to Section 19-13-
B103(d)(c) of the Public Health Code (PHC).  Plans are dated June 11, 2026, and bear a 
revision date of August 27, 2026. 
 
Plans were found to be in compliance with the requirements of Sections 19-13 B103d(c)(1)-
(3) of the RCSA.  Plans are APPROVED by this office pursuant to Section 19-13-B103e(f)(3) of 
the RCSA and the local director of health may issue an approval to construct pursuant to 
Section 19-13-B103e(f)(1) of the RCSA. The applicant is reminded that the Technical 
Standards requires compliance. 
 
If you have any questions or concerns, please contact sean.merrigan@ct.gov. 
 
Sincerely, 
 
 
Jenna Nicol 
Environmental Health Section Chief 
Regulatory Affairs Branch 
Department of Public Health 
 
cc:  Director of Health, Building Official 

Page 10

E
HARTFORD AVE
PROPOSED RESIDENTIAL
BUILDING
EXISTING DRIVEWAY
HARTFORD AVE
SEPTIC DESIGN PLAN
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION C-8 B
PERC TEST #2 DATA
SEPTIC SYSTEM PROFILE
NO SCALE
PERC TEST #1 DATA
DISTRIBUTION BOX DETAIL
NO SCALE
≥
≥
≥
≥
GEOMATRIX GST6236  LEACHING SYSTEM - SECTION A-A'
GEOMATRIX GST6236  LEACHING SYSTEM - PLAN VIEW
≥
≥
≥
GEOMATRIX GST6236  LEACHING SYSTEM - SECTION B-B'
GEOMATRIX GST  LEACHING SYSTEM - INSPECTION PORT
June 11, 2026
SUBSURFACE SEWAGE DISPOSAL SYSTEM PLAN
LOCUS MAP SCALE 1"=1000'
A. CT Public Health Dept. comments 8/4/26
B. CT Public Health Dept. comments 8/27/26
BORING B-2 DATA SHEET EXCERPT FROM GEOTECHNICAL
REPORT PREPARED BY GEI CONSULTANTS

Page 11

1 
 
 
Trinkaus Engineering, LLC    
114 Hunters Ridge Road 
Southbury, Connecticut   06488 
203-264-4558 (office) 
+1-203-525-5153 (mobile) 
E-mail:  strinkaus@earthlink.net 
http://www.trinkausengineering.com 
 
     August 10, 2026, Revised to 9/3/26 
 
Mr. John Laudati, Chairman 
Inland Wetlands and Watercourses Commission 
15 North Granby Road 
Granby, Connecticut     06035 
 
    Re: 8-30g Application 
     37 Hartford Avenue 
     Granby, Connecticut  
 
Dear Mr. Laudati and Members of the Inland Wetlands and Watercourses Commission, 
 
At the request of Peter Voskowsky, I have reviewed the submitted information (August 4 
to 25, 3026) for the above referenced project and have the following comments for your 
consideration. 
 
Executive Summary: 
A. The sewage disposal system as proposed does not comply with environmental 
requirements for nitrogen and bacteria and viruses.  Comment has not been addressed. 
B. No groundwater monitoring was done on the site to determine the depth and direction of 
the groundwater table on the site.   This is critical information to know to be able to 
assess additional environmental impacts on the downgradient wetland area.  Response 
provided, but did not address the comment. 
C. The proposed stormwater management system will result in soluble non-point source 
pollutants being discharged into the groundwater table and ultimately reaching the 
downgradient wetland area.  Comment has not been addressed. 
 
Sewage Disposal System: 
1. In this proposal, the proposed on-site sewage disposal system is located between the 
proposed building and Hartford Avenue.   It has been designed to handle 3,700 gallons 
per day (gpd) of effluent.  As the soils on the site consists of coarse sand and gravel, 
effluent will move quickly through the soil while not providing a high degree of 
treatment of the effluent.  The response by the applicant does not address the lack of 
effluent treatment in the coarse grained sand and gravel soils. 
2. No groundwater monitoring has been done to determine the depth and direction of the 
groundwater on the site.   In coarse sand and gravel soils, the groundwater does not 
always follow the topographic slope of the ground surface.  This is critical information to 

Page 12

2 
 
know to fully assess environmental impacts of the proposed sewage disposal system.  
Comment addressed. 
3. The CT DEEP criteria for nitrogen dilution and 21-day travel time for bacteria and 
viruses have not been evaluated for the proposed system.  This is a requirement as the 
State Department of Public Health is taking over jurisdiction of sewage disposal systems 
up to 11,000 gpd.  While the State Health Department does not require the nitrogen 
analysis and bacteria travel time, these analyses can be requested by a local land use 
agency to assess the long term environmental impact of a sewage disposal system.   
Comment not addressed. 
4. Using the applicant’s data and the protocol of the CT DEEP, I have performed these 
calculations and the results are below: 
a. The CT DEEP goal and soon to be under the jurisdiction of the State Health 
Department is to have a nitrogen concentration of 10 mg/l at a wetland boundary 
or property line.    
i. The nitrogen concentration entering a septic tank is 65 mg/l, it is reduced 
by 40% when it leaves the septic tank, so a nitrogen concentration of 39 
mg/l is directed to the leaching fields.   
ii. The area allowed to be considered for dilution is only the area above, over 
or below the leaching fields to the point of concern.   It this case, the point 
of concern is the property line along Hartford Avenue.  According to the 
plans, only 0.227 acres are available for use in the nitrogen dilution 
calculation. 
iii. Using this data and the CT DEEP protocol, the nitrogen concentration will 
be 34.8 mg/l which is more than three times what is permitted. 
iv. Without knowing the depth and direction of the groundwater table on this 
site, this nitrogen could also be moving toward the wetland system at the 
rear of the site.  The applicant used the entire site area for the nitrogen 
analysis to get less than 10 mg/l.   To properly do the nitrogen analysis 
only the area uphill, over and downhill of the system to the point of 
concern (in this case the property line along Hartford Avenue) can be 
used to determine the nitrogen concentration which is three times the 
10 mg/l cited by the applicant. 
b. The purpose of the 21-day travel time for bacteria and viruses is to determine the 
distance downgradient of the leaching system where the bacteria and viruses will 
naturally die off within the soil profile. 
i. No permeability tests were done in the proposed leaching system.   On the 
prior application, where the leaching system was proposed in the rear of 
the building, two permeability tests were done.  The tests yielded 
permeability rates of 111.6 “/hour (223.3 ft/day) and 138.5 “/hour (277 
ft/day) which are typical for coarse sand and gravel soils. 
ii. In calculating the distance for the 21-day travel time, the higher 
permeability rate is used as it will yield the worst case scenario.   
iii. Using the permeability rate of 277 ft/day, a ground slope of 2.0%, the 
distance for the 21-day travel time for the die off of bacteria and viruses 
will be 332 feet.  The plan provides only 54’ to the property line, so this 
environmental criteria has not been met.  See response to #3 above. 

Page 13

3 
 
 
Stormwater Management: 
5. The stormwater management system consists of an underground infiltration system 
consisting of StormTech SC-800 units surrounded by crushed stone with an Isolator Row.  
An online hydrodynamic separator is proposed prior to the underground system.   
6. It is stated on the plan that two test pits shall be dug in the vicinity of the underground 
system to confirm soil conditions.    This work needs to be done prior to any land use 
approval, not after the fact.  Any soil testing needs to be witnessed by the Granby Town 
Engineer.  Soil testing needs to be done prior to a decision being made by any land 
use agency to confirm the design of the system is appropriate. 
7. According to the detail of the Inlet Control Structure (PICS-1), a weir wall is proposed to 
direct runoff to the Isolator Row.  A note on the plan states that the top of the weir wall 
just be 6” above the invert of the 24” pipe to the Isolator Row.  As the invert of the 24” 
pipe is 95.00’, this would make the top of the weir wall 195.50’.  This is 0.26’ higher 
than the invert of the inlet pipe entering this structure and will cause a backwater 
condition in the inlet pipe which is not sound engineering.  Comment addressed. 
8. Building roof drains are directly connected to the underground system with no treatment 
of the runoff.   It is well documented in professional literature that up to 40% of annual 
nitrogen and phosphorous loads are the result of atmospheric deposition on impervious 
surfaces.  Runoff from a single family house is relatively clean, but larger roofs areas 
for apartments or commercial buildings is not clean.  Roof runoff must be treated 
due to the amount of nutrients which can be deposited on the roof by atmospheric 
deposition. 
9. The CT DEEP requires that TSS is reduced by 80%, TP by 50%, and TN by 30% as this 
is a redevelopment site.  While the TSS standard can be met with the Isolator Row, the 
TP and TN reductions will not be met by any component of the stormwater management 
system and thus will be discharged to the groundwater table and will ultimately reach the 
wetlands at the bottom of the slope.  Providing a storage volume for runoff does not 
equate to treatment.   The line is the 2024 Storm Water Quality Manual is not 
supported by evidence.   DEEP requires the reduction of pollutant loads above and 
the proposed system does not meet these criteria. 
10. As there is minimal use of sand during winter snow operations with liquid deicing agents 
being used instead, the pollutants of concern will remain in a soluble state as there is no 
particulate material for the pollutants to bind onto.  Pollutants in a soluble state will move 
extremely quickly through the coarse sand and gravel on this site and not be treated at all 
by the coarse native soil.   The soluble pollutants will ultimately reach the downgradient 
wetlands.  Filtration through organic sandy or silty loam soils will reduce nutrient 
loads, however, coarse grained sand and gravels do not provide any treatment as 
there is no organic component to these soils and the runoff moves quickly through 
them providing no treatment. 
11. Based upon the plan, the underground stormwater system is approximately 144’ from the 
wetland boundary.    Based upon the previous permeability testing done in this area, 
stormwater in the infiltration system will reach the wetland boundary between 12.5 and 
15.5 hours after entering the system with the soluble pollutants being discharged to the 
groundwater or wetlands on the site. Comment has not been addressed.   Soluble 
pollutants will quickly travel through the coarse grained sand and gravels with no 

Page 14

4 
 
treatment and be discharged via groundwater into the wetland system as the bottom 
of the slope. 
12. It is stated on page 2-6 of the stormwater report that deep sump catch basins with hooded 
outlets will be used on the site.   The detail of the catch basin shown on Sheet D-4 shows 
the bottom of the hood being equal to the outlet invert of the pipe.   This design will not 
trap oils and grease within the catch basin.  Comment addressed. 
13. It is stated on page 3-10 of the stormwater report that the use of non-structural LID 
systems was limited on the site.  As an expert in the field of Low Impact Development, 
this statement is not correct.  The proposed development plan could have been modified 
to implement LID strategies on this site.   Comment not addressed.   Stormwater 
system does not use environmentally sound LID systems to reduce non-point source 
pollutants. 
14. It is also stated that by holding the Water Quality Volume in the underground system, 
Standard #1 of the CT DEEP Storm Water Quality Manual has been met.   This statement 
is not factually correct as simply providing and/or infiltrating the Water Quality Volume 
does NOT equate to treatment for the reasons discussed above.  Comment not 
addressed.   The applicant should explain with calculations how soluble pollutants 
will be reduced by the system instead of simply citing a book which provides no 
scientific explanation how providing a volume equates to treatment. 
15. The calculation of the Water Quality Volume uses the entire site area.   This is not correct 
as most of the site is NOT tributary to the stormwater management system.  The Water 
Quality Volume calculation needs to be revised to only include those areas tributary to 
the stormwater system.  Comment not addressed.   If only the tributary area to the 
treatment system was used, the impervious area would be a higher percentage of the 
land area which would affect the determination of the Water Quality Volume. 
16. It is also stated that the provided storage volume will exceed the required Water Quality 
Volume, thus the pollutant load reductions required by CT DEEP will be met.  This 
statement is not supported by science and field monitoring of stormwater management 
systems.  See response #14 above. 
17. The applicant claims that since they are containing the water quality volume in the 
multiple stormwater systems, the pollutant loads are magically reduced as the following 
language from the CT DEEP 2024 Storm Water Quality Manual seems to imply:  
“Achieving these minimum required load reductions for sediment and nutrients is 
assumed to provide adequate reductions of other stormwater pollutants including 
floatable materials. However, it is important to note that if the full retention goal (i.e., 
Required Retention Volume) is met, then it is assumed pollutant reduction is also 
achieved and individual pollutant calculations are not necessary.”  
18. The above statement is not supported by science for the following reasons:  Assumed is 
not an engineering term.   No evidence is found in the 2024 Manual to support the 
above statement. 
a. Treatment Processes: Effective removal relies on specific physical, chemical, and 
biological processes occurring within the practice, such as sedimentation, 
filtration, adsorption, and microbial action. Holding the water simply provides the 
opportunity for these processes to work. 
b. Design and Maintenance: The specific design of the practice (e.g., detention pond, 
rain garden, permeable pavement) and its ongoing maintenance are vital for 

Page 15

5 
 
ensuring these processes function correctly. Clogged systems or short-circuiting 
flow paths can drastically reduce efficiency, even if the total volume is captured. 
c. Pollutant Characteristics: Different pollutants behave differently. Suspended 
solids often settle out well, while dissolved nutrients (like nitrogen and 
phosphorus) or certain chemicals might require specialized treatment components 
or longer retention times for effective removal. 
d. Storm Dynamics: The WQV is typically designed for a specific "design storm" 
(e.g., the first flush or a 90% storm event) [1]. Larger or more intense storms may 
overwhelm the system, resulting in bypass or reduced treatment efficiency for the 
excess volume.  
e. Many stormwater practices found in the 2024 CT DEEP Storm Water Quality 
Manual are incapable of providing the high level of reduction required.   As an 
example, a Dry Detention Basin is rated by CT DEEP to have Moderate TSS 
removal and low TP and TP removal, so it does not matter how much water is 
held in a Dry Detention Basin, the required pollutant load reductions will never be 
met as the system cannot provide them. 
19. Because of the extremely fast permeability rates in the underground stormwater system, a 
pollutant loading analysis must be done to demonstrate that non-point source pollutants 
will be reduced prior to introduction to the underground stormwater system as no 
additional will occur in the coarse sandy soils.  Comment not addressed. 
20. In the routing analyses for the underground stormwater system, the applicant is using an 
infiltration rate of 8.27”/hour which is a Rawls rate for Sand.   Rawl’s rates were 
developed in 1982 and are national average of infiltration rates for various soil types.  
The Rawl’s rates were determined as follows: 
a. Literature Survey: The researchers compiled a massive set of measured soil 
characteristics from across the United States, looking at parameters like particle-
size distribution (percentages of sand, silt, and clay), bulk density, and porosity. 
b. Textural Grouping: They sorted the collected field and laboratory data into the 11 
standard USDA soil textural classes (ranging from sand down to clay).  
c. Statistical Averaging: For each textural class, average values for hydraulic 
properties—including bubbling pressure, pore-size distribution index (λ), and 
saturated hydraulic conductivity (\(K_{s}\))—were computed using statistical 
regression and data fitting. 
d. Rawl’s rates are not direct field infiltration test measurements.   If field 
infiltration rates are reduced by 50%, then the Rawl’s rates should also be 
reduced by 50% to provide a factor of safety in the design.   This is sound 
engineering practice. 
21. It is required under the CT DEEP 2024 Storm Water Quality Manual that only 50% of the 
Rawl’s rate be used in the hydrologic modeling of an infiltration practice when using the 
Static sizing method.  See response to #20 above. 
22. A reserve/secondary snow storage area has been added to the south of the pavilion at the 
end of the parking aisle.  According to Sheet C-4, the pavilion will have a roof so there is 
no access to the secondary snow storage area.  The two areas shown for snow storage are 
too small for any meaningful stockpiling of snow.   Thus, the snow management plan is 
ineffective.  On Sheet C-4, a sidewalk is shown on the southwest side of the pavilion.  
The sidewalk prevents access to the snow storage area behind the pavilion.  If snow 

Page 16

6 
 
is plowed to the front of the pavilion, there will be no access to the rear snow storage 
area. 
 
Please contact my office if you have any questions concerning this information. 
 
     Respectfully submitted, 
     Trinkaus Engineering, LLC 
      
     Steven D. Trinkaus, PE 
 

Page 17

Kevin Clark, PEL 
Town Engineer 
Town of Granby 
15 North Granby Road  
Granby, CT 06035                                                
 CT: (860) 844-5318 
E-MAIL: townengineer@granby-ct.gov 
 
 
Page 1 of 1 
 
 
 
Plan Review 
 
August 31, 2026 
 
“Site Plans, Residential Development, 37  Hartford Avenue – Granby, CT 06035, Mr. Forest Dvine, 129 
Lovers Lane, Granville, MA 01034, by R Levesque Associates, Inc., Francis Real Estate Holdings, Scale: 
1”=30’, Date: May 27, 2026, Revised August 25, 2026.” 
 
“Response to Peer Review Comments, August 25, 2026.” 
 
Comments: 
 
Peer Review Comment 7: 
 The applicant ’s engineer made one minor revision to the invert of the stormwater management 
system at PICS -1.  This change will have little impact on the operation of the system and will have  no 
adverse impact on the same.  
 
 
 
by: Kevin Clark, PEL, Town Engineer 
 
 
 
 
 
 

Page 18

R LEVESQUE ASSOCIATES, INC. 
40 School Street, P.O. BOX 640, Westfield, MA 01085 
p 413.568.0985  ·  f 413.568.0986  ·  www.rlaland.com  
 
A L AND PL ANNING SERVICES COMPANY 
 
August 25, 2026 
 
Via email: wetlandsagent@granby-ct.gov 
 
John L. Laudati, Chairman 
Town of Granby Inland Wetlands & Watercourses Commission  
15 North Granby Road  
Granby, Connecticut 06035 
 
RE:  Response to Peer Review Comments 
37 Hartford Avenue  
Granby, Connecticut 06035  
(Parcel ID: 4254) 
RLA Project File No. 251219 
 
Dear Chairman Laudati:  
 
On behalf of the Applicant, Forrest Devine, R Levesque Associates, Inc. (RLA) is pleased to 
provide the following responses to the peer review comments issued by Trinkaus Engineering, 
LLC for the above-referenced project. RLA appreciates the independent professional 
engineering review and the opportunity to address the comments provided. 
For clarity and ease of review, each peer review comment is reproduced below in italicized 
text, followed immediately by the corresponding RLA Response in blue, boldface text. 
Comment numbering and organization have been maintained consistent with the original 
Trinkaus Engineering, LLC peer review document. 
 
Sewage Disposal System:  
1. In this proposal, the proposed on-site sewage disposal system is located between the 
proposed building and Hartford Avenue. It has been designed to handle 3,700 gallons 
per day (gpd) of effluent. As the soils on the site consists of coarse sand and gravel, 
effluent will move quickly through the soil while not providing a high degree of treatment 
of the effluent.  
RLA Response: Based on test pits conducted by certified soil scientist, Ryan Nelson from 
RLA, the soil conditions within the vicinity of the proposed subsurface sewage disposal 
system (SSDS) showed evidence of loamy sand materials within the A & B soil horizons 
and coarse sand material within the C soil horizon. Additionally, percolation tests were 
conducted in two (2) of the four (4) test pits located within the vicinity of the proposed 

Page 19

R LEVESQUE ASSOCIATES, INC. 
40 School Street, P.O. BOX 640, Westfield, MA 01085 
p 413.568.0985  ·  f 413.568.0986  ·  www.rlaland.com  
 
A L AND PL ANNING SERVICES COMPANY 
 
septic system as required by the Connecticut Public Health Code. The results of these 
tests were utilized in the design of the SSDS to determine the effective leaching area. The 
proposed SSDS utilizes the design criteria set forth in the Connecticut Public Health Code: 
On-Site Sewage Disposal Regulations and Technical Standards for Subsurface Sewage 
Disposal Systems 2024.  
2. No groundwater monitoring has been done to determine the depth and direction of 
the groundwater on the site. In coarse sand and gravel soils, the groundwater does not 
always follow the topographic slope of the ground surface. This is critical information to 
know to fully assess environmental impacts of the proposed sewage disposal system.  
RLA Response: RLA has coordinated with the Local Health District and the Connecticut 
Department of Public Health (CT DPH) regarding the proposed septic system. Both 
agencies have reviewed the design plans and provided comments, which have been 
incorporated into the revised plans issued on August 4, 2026. 
No relief is being sought for groundwater separation. The proposed SSDS complies with 
applicable Connecticut Public Health Code requirements. Four test pits conducted by 
RLA identified no groundwater or evidence of groundwater to depths of 8.33 feet below 
grade. In addition, the 2023 GEI investigation documented two monitoring wells and 
three borings with no groundwater encountered to depths of 22 feet below grade. Based 
on these investigations, there is no evidence of groundwater within the proposed SSDS 
area that would affect the design or required groundwater separation. 
3. The CT DEEP criteria for nitrogen dilution and 21-day travel time for bacteria and viruses 
have not been evaluated for the proposed system. This is a requirement as the State 
Department of Public Health is taking over jurisdiction of sewage disposal systems up to 
11,000 gpd.  
RLA Response: RLA has coordinated with the Local Health District and the Connecticut 
Department of Public Health (CT DPH) regarding the proposed septic system. Both 
agencies have reviewed the design plans and provided comments, which have been 
incorporated into the revised plans issued on August 4, 2026. Based on the proposed 
design flow of less than 5,000 gallons per day (gpd), the project does not trigger the CT 
DEEP requirements for a nitrogen dilution assessment or evaluation of a 21-day travel 
time for bacteria and viruses. Accordingly, these assessments are not required for the 
proposed system. 
 

Page 20

R LEVESQUE ASSOCIATES, INC. 
40 School Street, P.O. BOX 640, Westfield, MA 01085 
p 413.568.0985  ·  f 413.568.0986  ·  www.rlaland.com  
 
A L AND PL ANNING SERVICES COMPANY 
 
 
4. Using the applicant’s data and the protocol of the CT DEEP, I have performed these 
calculations and the results are below:  
a. The CT DEEP goal and soon to be under the jurisdiction of the State Health 
Department is to have a nitrogen concentration of 10 mg/l at a wetland 
boundary or property line. The nitrogen concentration entering a septic tank is 65 
mg/l, it is reduced by 40% when it leaves the septic tank, so a nitrogen 
concentration of 39 mg/l is directed to the leaching fields.  
i. The area allowed to be considered for dilution is only the area above, over 
or below the leaching fields to the point of concern. It this case, the point 
of concern is the property line along Hartford Avenue. According to the 
plans, only 0.227 acres are available for use in the nitrogen dilution 
calculation.  
ii. Using this data and the CT DEEP protocol, the nitrogen concentration will 
be 34.8 mg/l which is more than three times what is permitted.  
iii. Without knowing the depth and direction of the groundwater table on this 
site, this nitrogen could also be moving toward the wetland system at the 
rear of the site.  
RLA Response: RLA has coordinated with the Local Health District and the Connecticut 
Department of Public Health (CT DPH) regarding the proposed septic system. Both 
agencies have reviewed the design plans and provided comments, which have been 
incorporated into the revised plans issued on August 4, 2026. 
Based on RLA’s review of the applicable Connecticut Department of Public Health (CT 
DPH) Technical Standards and current CT DEEP requirements, the proposed 3,700 gpd 
conventional SSDS is subject to the applicable CT DPH/local health department review 
and approval requirements. There is no provision within the applicable DPH Technical 
Standards that requires a CT DEEP nitrogen dilution analysis.  
Notwithstanding the above, and acknowledging the Commission’s concerns regarding 
potential nitrogen impacts to the wetland resources associated with previously 
proposed projects in the area, RLA has completed a simplified nitrogen assessment 
using the methodology identified in the 2026 CT DPH Technical Standards. The 
assessment was provided to further evaluate the potential nitrogen impacts associated 
with the proposed SSDS. Based on the site-specific assumptions and data used in the 
assessment, the resulting nitrogen concentration is less than the 10 mg/L drinking water 

Page 21

R LEVESQUE ASSOCIATES, INC. 
40 School Street, P.O. BOX 640, Westfield, MA 01085 
p 413.568.0985  ·  f 413.568.0986  ·  www.rlaland.com  
 
A L AND PL ANNING SERVICES COMPANY 
 
standard as demonstrated in the previously submitted calculation.  
b. The purpose of the 21-day travel time for bacteria and viruses is to determine the 
distance downgradient of the leaching system where the bacteria and viruses will 
naturally die off within the soil profile.  
i. No permeability tests were done in the proposed leaching system. On the 
prior application, where the leaching system was proposed in the rear of 
the building, two permeability tests were done. The tests yielded 
permeability rates of 111.6 “/hour (223.3 ft/day) and 138.5 “/hour (277 
ft/day) which are typical for coarse sand and gravel soils.  
ii. In calculating the distance for the 21-day travel time, the higher 
permeability rate is used as it will yield the worst case scenario.  
iii. Using the permeability rate of 277 ft/day, a ground slope of 2.0%, the 
distance for the 21-day travel time for the die off of bacteria and viruses will 
be 332 feet. The plan provides only 54’ to the property line, so this 
environmental criteria has not been met.  
RLA Response: RLA has coordinated with the Local Health District and the Connecticut 
Department of Public Health (CT DPH) regarding the proposed septic system. Both 
agencies have reviewed the design plans and provided comments, which have been 
incorporated into the revised plans issued on August 4, 2026. 
Stormwater Management: 
5. The stormwater management system consists of an underground infiltration system 
consisting of StormTech SC-800 units surrounded by crushed stone with an Isolator Row. 
An online hydrodynamic separator is proposed prior to the underground system.  
RLA Response: Acknowledged, no response necessary. 
6. It is stated on the plan that two test pits shall be dug in the vicinity of the underground 
system to confirm soil conditions. This work needs to be done prior to any land use 
approval, not after the fact. Any soil testing needs to be witnessed by the Granby Town 
Engineer.  
RLA Response: The stormwater management system design was developed based on 
the available subsurface information, including test pits conducted by RLA in support of 
the proposed SSDS and the subsurface investigation documented in the 2023 
geotechnical report prepared by GEI Consultants, Inc. At least one of the GEI borings 

Page 22

R LEVESQUE ASSOCIATES, INC. 
40 School Street, P.O. BOX 640, Westfield, MA 01085 
p 413.568.0985  ·  f 413.568.0986  ·  www.rlaland.com  
 
A L AND PL ANNING SERVICES COMPANY 
 
was located in close proximity to the proposed subsurface infiltration system. The 
available investigations indicate consistent subsurface soil conditions within the project 
area and provide a reasonable basis for the soil parameters used in the stormwater 
design. 
Additional test pits will be conducted within the vicinity of the proposed subsurface 
infiltration system prior to construction to confirm the anticipated subsurface conditions. 
RLA will coordinate with the Granby Town Engineer regarding the timing and witnessing 
of the additional test pits. 
7. According to the detail of the Inlet Control Structure (PICS-1), a weir wall is proposed to 
direct runoff to the Isolator Row. A note on the plan states that the top of the weir wall 
just be 6” above the invert of the 24” pipe to the Isolator Row. As the invert of the 24” 
pipe is 95.00’, this would make the top of the weir wall 195.50’. This is 0.26’ higher than 
the invert of the inlet pipe entering this structure and will cause a backwater condition 
in the inlet pipe which is not sound engineering.  
RLA Response: The pipe invert elevations have been revised to prevent a backwater 
condition.  
8. Building roof drains are directly connected to the underground system with no 
treatment of the runoff. It is well documented in professional literature that up to 40% of 
annual nitrogen and phosphorous loads are the result of atmospheric deposition on 
impervious surfaces. 
RLA Response: The proposed stormwater management system was designed in 
accordance with the CT DEEP Stormwater Quality Manual and reviewed by the Town of 
Granby Department of Public Works Town Engineer. The Manual does not require 
pretreatment for infiltration BMPs receiving clean roof runoff. Pretreatment is generally 
required for runoff from roads and parking areas due to the potential for higher pollutant 
loads. The stormwater management system was specifically designed to keep the roof 
runoff separate from the roadway/parking lot areas. Therefore, the proposed direct 
discharge of roof runoff to the infiltration system is consistent with CT DEEP requirements. 
9. The CT DEEP requires that TSS is reduced by 80%, TP by 50%, and TN by 30% as this is a 
redevelopment site. While the TSS standard can be met with the Isolator Row, the TP and 
TN reductions will not be met by any component of the stormwater management 
system and thus will be discharged to the groundwater table and will ultimately reach 
the wetlands at the bottom of the slope.  

Page 23

R LEVESQUE ASSOCIATES, INC. 
40 School Street, P.O. BOX 640, Westfield, MA 01085 
p 413.568.0985  ·  f 413.568.0986  ·  www.rlaland.com  
 
A L AND PL ANNING SERVICES COMPANY 
 
RLA Response: The proposed stormwater management system was designed in 
accordance with the CT DEEP Stormwater Quality Manual and reviewed by the Town of 
Granby Department of Public Works Town Engineer. Table 4-3 of the 2024 Connecticut 
Stormwater Quality Manual identifies minimum average annual pollutant load reduction 
targets for TSS, TP, and TN when evaluating BMP selection and sizing. As stated in Table 
4-3 of the manual: “A proposed stormwater management system meets or exceeds 
these average annual pollutant load reductions when the Required Retention Volume is 
retained on-site using suitable stormwater retention practices.” The proposed 
subsurface infiltration basin is designed to retain the applicable Required Retention 
Volume in accordance with Standard 1. Therefore, additional treatment specifically for 
TP and TN is not required under the Manual, and the assertion that these pollutants will 
necessarily reach the groundwater or wetlands is not supported by the Manual. 
10. As there is minimal use of sand during winter snow operations with liquid deicing agents 
being used instead, the pollutants of concern will remain in a soluble state as there is no 
particulate material for the pollutants to bind onto. Pollutants in a soluble state will move 
extremely quickly through the coarse sand and gravel on this site and not be treated at 
all by the coarse native soil. The soluble pollutants will ultimately reach the downgradient 
wetlands.  
RLA Response: The proposed stormwater management system was designed in 
accordance with the CT DEEP Stormwater Quality Manual and reviewed by the Town of 
Granby Department of Public Works Town Engineer. The assertion that soluble pollutants 
will “not be treated at all” by the proposed infiltration system is not consistent with the 
Connecticut Stormwater Quality Manual. 
The 2024 Connecticut Stormwater Quality Manual identifies infiltration BMPs as 
stormwater treatment practices that reduce pollutant loads through physical filtering, 
adsorption of pollutants onto soil particles, and subsequent biological and chemical 
processes within the soil profile. The Manual specifically identifies underground 
infiltration systems as providing pollutant removal. 
Furthermore, a snow management plan has been submitted in order to implement best 
snow management practices. Methods such as using anti-icing brine and hand 
shoveling pedestrian pathways first are some examples of methods that will be 
implemented to cut down on the total salt use. Additionally, signage will be added 
around the site indicating the designated snow storage areas. 
 

Page 24

R LEVESQUE ASSOCIATES, INC. 
40 School Street, P.O. BOX 640, Westfield, MA 01085 
p 413.568.0985  ·  f 413.568.0986  ·  www.rlaland.com  
 
A L AND PL ANNING SERVICES COMPANY 
 
11. Based upon the plan, the underground stormwater system is approximately 144’ from 
the wetland boundary. Based upon the previous permeability testing done in this area, 
stormwater in the infiltration system will reach the wetland boundary between 12.5 and 
15.5 hours after entering the system with the soluble pollutants being discharged to the 
groundwater or wetlands on the site.  
RLA Response: The proposed stormwater management system was designed in 
accordance with the CT DEEP Stormwater Quality Manual and reviewed by the Town of 
Granby Department of Public Works Town Engineer. Table 10-3 of the 2024 Connecticut 
Stormwater Quality Manual establishes recommended minimum horizontal setback 
distances for stormwater infiltration systems from specified site features, including a 50-
foot minimum setback from wetlands. The proposed subsurface infiltration basin is 
located approximately 144 feet from the wetland boundary, which exceeds the 
applicable 50-foot setback by approximately 94 feet. 
12. It is stated on page 2-6 of the stormwater report that deep sump catch basins with 
hooded outlets will be used on the site. The detail of the catch basin shown on Sheet D-
4 shows the bottom of the hood being equal to the outlet invert of the pipe. This design 
will not trap oils and grease within the catch basin.  
RLA Response: The catch basin detail on Sheet D-4 has been revised to graphically 
extend the hood below the outlet pipe invert.  
13. It is stated on page 3-10 of the stormwater report that the use of non-structural LID 
systems was limited on the site. As an expert in the field of Low Impact Development, 
this statement is not correct. The proposed development plan could have been 
modified to implement LID strategies on this site.  
RLA Response: The proposed stormwater management system has been designed in 
accordance with the CT DEEP Stormwater Quality Manual. Additionally, the proposed 
stormwater management design was reviewed and approved by the Town of Granby 
Department of Public Works Town Engineer. 
14. It is also stated that by holding the Water Quality Volume in the underground system, 
Standard #1 of the CT DEEP Storm Water Quality Manual has been met. This statement 
is not factually correct. 
RLA Response: RLA respectfully disagrees with the comment. The statement that 
Standard 1 of the 2024 Connecticut Stormwater Quality Manual is satisfied by retaining 
the applicable Water Quality Volume (WQV) within the proposed underground 

Page 25

R LEVESQUE ASSOCIATES, INC. 
40 School Street, P.O. BOX 640, Westfield, MA 01085 
p 413.568.0985  ·  f 413.568.0986  ·  www.rlaland.com  
 
A L AND PL ANNING SERVICES COMPANY 
 
infiltration system is consistent with the Manual's stated compliance methodology. 
Standard 1 establishes the requirement to retain the applicable Required Retention 
Volume (RRV) on-site through the use of appropriate stormwater retention practices. The 
proposed subsurface infiltration basin has been designed to retain the applicable 
WQV/RRV on-site. Accordingly, the proposed system satisfies the retention requirement 
established under Standard 1. 
Furthermore, the Manual's methodology provides that where the applicable RRV is fully 
retained on-site using suitable stormwater retention practices, additional treatment is 
not required. Therefore, the statement that the proposed system satisfies Standard 1 
based upon retention of the applicable WQV/RRV is consistent with the 2024 
Connecticut Stormwater Quality Manual. 
15. The calculation of the Water Quality Volume uses the entire site area. This is not correct 
as most of the site is NOT tributary to the stormwater management system. 
RLA Response: The 2024 Connecticut Stormwater Quality Manual defines the area used 
in the Water Quality Volume (WQV) calculation as the post-development total drainage 
area of the site or design point. The WQV calculation was therefore based on the total 
post-development drainage area. While the calculation includes areas that are not 
directly tributary to the proposed stormwater management system, the use of the total 
drainage area is consistent with the Manual and represents a conservative approach.  
16. It is also stated that the provided storage volume will exceed the required Water Quality 
Volume, thus the pollutant load reductions required by CT DEEP will be met. This 
statement is not supported by science and field monitoring of stormwater management 
systems.  
RLA Response: The project's stormwater management system has been designed to 
meet the Required Retention Volume by providing the Water Quality Volume (WQV) 
standards in accordance with Standard 1 of the 2024 Connecticut Stormwater Quality 
Manual. The Manual provides the regulatory basis for the relationship between 
achieving the Required Retention Volume and pollutant load reduction. 
Since the proposed system has been designed to meet the Required Retention Volume, 
the project is considered compliant with the pollutant load reduction requirements of 
Standard 1 pursuant to the Manual. 
 

Page 26

R LEVESQUE ASSOCIATES, INC. 
40 School Street, P.O. BOX 640, Westfield, MA 01085 
p 413.568.0985  ·  f 413.568.0986  ·  www.rlaland.com  
 
A L AND PL ANNING SERVICES COMPANY 
 
17. The applicant claims that since they are containing the water quality volume in the 
multiple stormwater systems, the pollutant loads are magically reduced as the following 
language from the CT DEEP 2024 Storm Water Quality Manual seems to imply:  
“Achieving these minimum required load reductions for sediment and nutrients is 
assumed to provide adequate reductions of other stormwater pollutants including 
floatable materials. However, it is important to note that if the full retention goal (i.e., 
Required Retention Volume) is met, then it is assumed pollutant reduction is also 
achieved and individual pollutant calculations are not necessary.”  
RLA Response: The quoted language is drawn directly from the adopted 2024 CT DEEP 
Stormwater Quality Manual and reflects the Department's own current regulatory 
compliance methodology — it is not the applicant's characterization or an assumption 
invented by the design team. This is the controlling and applicable compliance 
standard for this application. The project's stormwater management system has been 
designed to meet the Required Retention Volume in accordance with Standard 1 of the 
Manual, which the Manual itself states satisfy the associated pollutant load reduction 
goals. 
18. The above statement is not supported by science for the following reasons: 
a. Treatment Processes: Effective removal relies on specific physical, chemical, and 
biological processes occurring within the practice, such as sedimentation, 
filtration, adsorption, and microbial action. Holding the water simply provides the 
opportunity for these processes to work. 
b. Design and Maintenance: The specific design of the practice (e.g., detention 
pond, rain garden, permeable pavement) and its ongoing maintenance are vital 
for ensuring these processes function correctly. Clogged systems or short-
circuiting flow paths can drastically reduce efficiency, even if the total volume is 
captured. 
c. Pollutant Characteristics: Different pollutants behave differently. Suspended solids 
often settle out well, while dissolved nutrients (like nitrogen and phosphorus) or 
certain chemicals might require specialized treatment components or longer 
retention times for effective removal. 
d. Storm Dynamics: The WQV is typically designed for a specific "design storm" (e.g., 
the first flush or a 90% storm event) [1]. Larger or more intense storms may 
overwhelm the system, resulting in bypass or reduced treatment efficiency for the 
excess volume. 
e. Many stormwater practices found in the 2024 CT DEEP Storm Water Quality 

Page 27

R LEVESQUE ASSOCIATES, INC. 
40 School Street, P.O. BOX 640, Westfield, MA 01085 
p 413.568.0985  ·  f 413.568.0986  ·  www.rlaland.com  
 
A L AND PL ANNING SERVICES COMPANY 
 
Manual are incapable of providing the high level of reduction required.   As an 
example, a Dry Detention Basin is rated by CT DEEP to have Moderate TSS removal 
and low TP and TP removal, so it does not matter how much water is held in a Dry 
Detention Basin, the required pollutant load reductions will never be met as the 
system cannot provide them. 
RLA Response: RLA does not dispute that reasonable engineering debate exists within 
the profession regarding retention-based versus treatment-based stormwater 
compliance pathways generally. That debate, however, is appropriately directed to CT 
DEEP through the Manual's own periodic update process and is not a basis to impose 
project-specific design requirements beyond what the currently adopted 
Manual requires. The design team has followed the Department's current, adopted 
standard. 
19. Because of the extremely fast permeability rates in the underground stormwater system, 
a pollutant loading analysis must be done to demonstrate that non-point source 
pollutants will be reduced prior to introduction to the underground stormwater system 
as no additional will occur in the coarse sandy soils. 
RLA Response: See responses to Comments 9 and 17 above. The proposed stormwater 
management system was designed in accordance with the CT DEEP Stormwater Quality 
Manual and reviewed by the Town of Granby Department of Public Works Town 
Engineer. 
20. In the routing analyses for the underground stormwater system, the applicant is using an 
infiltration rate of 8.27”/hour which is a Rawls rate for Sand.   Rawl’s rates were 
developed in 1982 and are national average of infiltration rates for various soil types. 
The Rawl’s rates were determined as follows: 
a. Literature Survey: The researchers compiled a massive set of measured soil 
characteristics from across the United States, looking at parameters like particle-
size distribution (percentages of sand, silt, and clay), bulk density, and porosity. 
b. Textural Grouping: They sorted the collected field and laboratory data into the 11 
standard USDA soil textural classes (ranging from sand down to clay). 
c. Statistical Averaging: For each textural class, average values for hydraulic 
properties—including bubbling pressure, pore-size distribution index (λ), and 
saturated hydraulic conductivity (\(K_{s}\))—were computed using statistical 
regression and data fitting. 
d. Rawl’s rates are not direct field infiltration test measurements. 

Page 28

R LEVESQUE ASSOCIATES, INC. 
40 School Street, P.O. BOX 640, Westfield, MA 01085 
p 413.568.0985  ·  f 413.568.0986  ·  www.rlaland.com  
 
A L AND PL ANNING SERVICES COMPANY 
 
RLA Response: See response to Comment 21 below. 
21. It is required under the CT DEEP 2024 Storm Water Quality Manual that only 50% of the 
Rawl’s rate be used in the hydrologic modeling of an infiltration practice when using the 
Static sizing method.  
RLA Response: RLA disagrees; this comment misstates the Manual. Table 10-1 of the 2024 
CT DEEP Stormwater Quality Manual expressly states: “Default infiltration rates (Table 10-
2) may be used when sizing infiltration systems in HSG A or B soils using the Static Method. 
The design infiltration rate should otherwise be equal to 50% of the slowest field 
measured infiltration rate.” The 50% reduction factor applies to field-measured infiltration 
rates — used in the Dynamic Method, or in the Static Method for HSG C/D soils — and 
does not apply to the Table 10-2 default (Rawls) rate of 8.27 in/hr for Sand (HSG A), which 
the Manual permits to be used at full value for Static Method sizing. The applicant's use 
of 8.27 in/hr without reduction is therefore consistent with the Manual. 
22. A reserve/secondary snow storage area has been added to the south of the pavilion at 
the end of the parking aisle. According to Sheet C-4, the pavilion will have a roof so 
there is no access to the secondary snow storage area. The two areas shown for snow 
storage are too small for any meaningful stockpiling of snow. Thus, the snow 
management plan is ineffective.  
RLA Response: As described in the provided Snow Management Plan, the primary snow 
storage areas are located at either end of the drive aisles within the parking areas, with 
a secondary snow storage area provided to the southeastern side of the pavilion. 
Although the pavilion will have a roof, the secondary snow storage area will remain 
accessible from the parking area by a smaller off-road vehicle, such as an ATV or side-
by-side. The curbing surrounding the parking areas is mountable, allowing snow 
removal equipment to access the designated storage areas. 
The designated snow storage areas are intended to accommodate routine snow 
stockpiling, while any snow accumulation exceeding the available storage capacity 
will be loaded and transported off-site to an approved snow disposal location. 
Accordingly, the proposed snow management plan provides designated areas for on-
site snow storage, access for snow removal operations, and a contingency for the 
removal of excess snow from the site. 
 
 

Page 29

R LEVESQUE ASSOCIATES, INC. 
40 School Street, P.O. BOX 640, Westfield, MA 01085 
p 413.568.0985  ·  f 413.568.0986  ·  www.rlaland.com  
 
A L AND PL ANNING SERVICES COMPANY 
 
Should you have any questions or comments regarding this information, please do not hesitate 
to contact our office at your earliest convenience.   
 
Sincerely, 
R LEVESQUE ASSOCIATES, INC.  
 
 
 
Rebecca Li, P.E. 
 

Page 30

HARTFORD AVE
WINDMILL DR.
SHATTUCK AVE
RUSHFORD MEADE
BANK ST
OAKRIDGE DR
SITE
BY
Site Plans
AS PREPARED FOR
Proposed Residential Development
May 28, 2026
RLA Project Number: 251219
129 Lovers Lane
Granville, MA 01034
Mr. Forrest Devine
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
40 School Street  ·  Westfield, MA  ·  01085
ph 413.568.0985  ·  fax 413.568.0986
www.rlaland.com
R LEVESQUE
ASSOCIATES
INC
A LAND PLANNING SERVICES COMPANYR L A
DRAWING INDEX
SHEET NO. SHEET NAME ISSUE DATE REV. REV. DATE
T-1 TITLE SHEET 5/28/26 REV. A 8/4/26
EX-1 EXISTING CONDITIONS PLAN 5/27/26 REV. A 7/24/26
C-1 NOTES, SYMBOL & LINE LEGEND, AND ABBREVIATIONS 5/28/26 REV. A 8/4/26
C-2 CONSTRUCTION NOTES 5/28/26 REV. A 8/4/26
C-3 DEMOLITION AND REMOVALS PLAN 5/28/26 REV. A 8/4/26
C-4 LAYOUT AND MATERIALS PLAN 5/28/26 REV. A 8/4/26
C-5 GRADING, EROSION & SEDIMENTATION CONTROL PLAN 5/28/26 REV. A 8/4/26
C-6 DRAINAGE AND UTILITIES PLAN 5/28/26 REV. B 8/25/26
C-7 LANDSCAPING PLAN 5/28/26 REV. B 8/25/26
C-8 SEPTIC DESIGN PLAN 6/11/26 REV. A 8/4/26
SL-1 PHOTOMETRIC PLAN 5/28/26 REV. A 8/4/26
SL-2 LIGHTING FIXTURE DETAILS 5/28/26 REV. A 8/4/26
D-1 DETAILS 5/28/26 REV. A 8/4/26
D-2 DETAILS 5/28/26 REV. A 8/4/26
D-3 DETAILS 5/28/26 REV. B 8/25/26
D-4 DETAILS 5/28/26 REV. A 8/25/26
D-5 DETAILS 5/28/26 REV. A 8/4/26
D-6 DETAILS 8/4/26 REV. A 8/25/26
PERMITTING
NOT FOR CONSTRUCTION
Rev.: August 25, 2026

Page 31

p p p p p p p p p p
p
p
p p
Hartford   Avenue
EXISTING
FOUNDATION
WALLS
#41
#35
(CT - Route 189)
p p p p p p
p
p p p
p
p
p
p
p
p
p p p p p
p
p
p
p p p p p p p p p p p p p p p p p p p p p p
Limited Property/Boundary Survey
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - EXIST.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
DRAFTED BY:
As Noted
A.Z./J.L.
TBM Elevation Added
251219 37 Hartford Avenue
MLBU G-53/78/13
Granby, CT 06035
Forrest Devine
129 Lovers Lane
Granville, MA 01034
06-11-26
05-27-26
Iron Pins To Be Set Added 07-22-26
EX-1 A
ZONING REVIEW - Granby Center Zone
Commerial Center (COCE)
TYPE (MINIMUM) REQUIRED PROPOSED
AREA 20,000 SQ FT -
FRONTAGE 100 FT -
DEPTH 150 FT -
FRONT YARD 25 FT --
SIDE YARD 10 FT -
REAR YARD 20 FT -
HEIGHT (MAX) 3 STORIES (45 FT) -
BUILDING COVERAGE (MAX) 30% -
pppppp
C.S.P.C.S.
LOCUS MAP SCALE 1"=1000'

Page 32

NOTES, SYMBOL & LINE
LEGEND AND ABBREVIATIONS
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE_recover.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION C-1 A
X
pppppp
·
·
·
·
·
·
·
·
·
·
·
·
·
·
A. Town comments 8/4/26
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·

Page 33

CONSTRUCTION NOTES
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE_recover.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION C-2 A
A. Town comments 8/4/26

Page 34

p p p p p p p p p p
p
p
p p
Hartford   Avenue
EXISTING
FOUNDATION
WALLS
#41
#35
(CT - Route 189)
p p p p p
p
p
p p p
p
p
p
p
p
p
p p p p p
p
p
p
p p p p p p p p p p p p p p
p
p p p
p p p p
DEMOLITION & REMOVALS PLAN
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE_recover.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION C-3 A
A. Town comments 8/4/26

Page 35

p p p p p p p p p p
p
p
p p
Hartford   Avenue
(CT - Route 189)
p p p p p
p
p
p p p
p
p
p
p
p
p
p p p p p
p
p
p
p p p p p p p p p p p p p p
p
p p p
p p p p
3-STORY RESIDENTIAL
BUILDING
±5,447 S.F. PER STORY
STOP
LAYOUT & MATERIALS PLAN
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE_recover.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION C-4 A
ZONING REVIEW - COMMERCIAL CENTER (COCE)
TYPE (MINIMUM) REQUIRED EXISTING/PROPOSED
LOT AREA 20,000 FT2 111,184± FT2
LOT FRONTAGE 100 FT 170± FT
LOT DEPTH 150 FT 310± FT
FRONT YARD 25 FT 88.6± FT
SIDE YARD 10 FT 24.2± FT
REAR YARD 20 FT 177.2± FT
HEIGHT (MAX) 45 FT (3 STORIES) 3 STORIES
LOT COVERAGE (MAX) 30% 22.3%
LANDSCAPED AREA (MIN.) 20% 77.7%
PARKING 31 32
*PARKING REQUIREMENTS:
Multi-Family (2 bedrooms or more) - 2 spaces per unit
Thirteen (13) 2-bedroom units x 2 spaces/unit = 26 spaces
Multi-Family (1 bedroom) - 1.5 spaces per unit
Three (3) 1-bedroom units x 2 spaces/unit = 5 spaces
Total Required Parking Spaces = 31 spaces
A. Town comments 8/4/26

Page 36

p p p p p p p p p p
p
p
p p
Hartford   Avenue
(CT - Route 189)
p p p p p
p
p
p p p
p
p
p
p
p
p
p p p p p
p
p
p
p p p p p p p p p p p p p p
p
p p p
p p p p
3-STORY RESIDENTIAL
BUILDING
±5,447 S.F. PER STORY
FIRST STORY
F.F.E.=202.00±
SECOND STORY
F.F.E=213.75±
F.F.E.=202.50±
GRADING, EROSION &
SEDIMENTATION CONTROL PLAN
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION C-5 A
A. Town comments 8/4/26

Page 37

p p p p p p p p p p
p
p
p p
Hartford   Avenue
(CT - Route 189)
p p p p p
p
p
p p p
p
p
p
p
p
p
p p p p p
p
p
p
p p p p p p p p p p p p p p
p
p p p
p p p p
3-STORY RESIDENTIAL
BUILDING
±5,447 S.F. PER STORY
E
DRAINAGE & UTILITIES PLAN
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION C-6 B
A. Town comments 8/4/26
B. Drainage network revisions 8/25/26

Page 38

p p p p p p p p p p
p
p
p p
Hartford   Avenue
(CT - Route 189)
p p p p p
p
p
p p p
p
p
p
p
p
p
p p p p p
p
p
p
p p p p p p p p p p p p p p
p
p p p
p p p p
3-STORY RESIDENTIAL
BUILDING
±5,447 S.F. PER STORY
E
STOP
SITE LANDSCAPING PLAN
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION C-7 B
A. Town comments 8/4/26
B. IWWA comments 8/25/26

Page 39

E
HARTFORD AVE
PROPOSED RESIDENTIAL
BUILDING
EXISTING DRIVEWAY
HARTFORD AVE
SEPTIC DESIGN PLAN
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION C-8 A
PERC TEST #2 DATA
SEPTIC SYSTEM PROFILE
NO SCALE
PERC TEST #1 DATA
DISTRIBUTION BOX DETAIL
NO SCALE
≥
≥
≥
≥
GEOMATRIX GST6236  LEACHING SYSTEM - SECTION A-A'
GEOMATRIX GST6236  LEACHING SYSTEM - PLAN VIEW
≥
≥
≥
GEOMATRIX GST6236  LEACHING SYSTEM - SECTION B-B'
GEOMATRIX GST  LEACHING SYSTEM - INSPECTION PORT
June 11, 2026
SUBSURFACE SEWAGE DISPOSAL SYSTEM PLAN
LOCUS MAP SCALE 1"=1000'
A. CT Public Health Dept. comments 8/4/26

Page 40

Luminaire ScheduleQtyLabel
DescriptionTagLLF
LuminaireLumens
Luminaire
Watts
Total
Watts
3S4W
PROV2-36L-325-3K7-4W16 FTAG0.900381337.82113.46
1S5Q
PROV2-36L-325-3K7-5Q16 FTAG0.900415837.8237.82
1S4
PROV2-36L-295-3K7-4W16 FTAG0.900350134.134.1
1WP4F
BEACON: RWL1-48L-10-3K7-4F-UNV9' FTAG0.900123210.110.1
7WP4
BEACON: RWL1-48L-10-3K7-4W-U9' FTAG0.900128510.170.7
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.2
0.3
0.3
0.5
0.5
0.4
0.4
0.3
0.2
0.2
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.5
0.7
0.3
0.9
1.0
1.5
1.4
1.3
1.7
1.1
0.9
0.4
0.6
0.5
0.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.6
1.3
0.3
1.5
1.9
2.6
2.5
2.4
2.9
2.1
1.7
0.4
1.6
0.8
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.7
1.5
1.8
0.8
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.7
1.3
1.5
0.8
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.2
0.3
0.4
0.3
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.4
0.4
0.4
0.4
0.2
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.3
1.2
0.8
1.2
1.1
1.3
1.1
0.4
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.4
1.0
1.3
1.6
2.3
2.0
1.6
1.4
1.6
1.6
1.6
1.2
1.6
1.2
0.6
0.2
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.3
0.5
0.5
1.2
1.6
1.7
1.1
0.7
1.1
1.4
1.3
0.6
1.6
1.4
0.6
0.5
0.4
0.3
0.2
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.2
0.4
0.5
0.5
0.5
0.2
0.6
1.5
1.8
1.9
2.6
2.6
1.4
1.6
1.2
0.7
0.3
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.2
0.2
0.2
0.2
0.2
0.3
0.4
0.3
0.3
0.6
1.3
1.5
1.8
2.3
2.1
1.2
1.1
1.2
0.9
0.4
0.2
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.2
0.4
0.5
0.4
0.4
0.5
0.7
0.7
0.6
0.5
0.6
0.7
1.0
1.2
1.4
1.2
1.1
1.0
1.2
0.9
0.6
0.4
0.3
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.4
0.8
1.0
0.8
0.7
0.9
1.2
1.2
1.2
0.9
0.8
0.8
1.1
1.0
0.8
0.8
1.1
1.2
1.1
0.9
0.9
0.9
0.5
0.2
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.4
0.9
1.3
1.1
1.0
1.3
1.4
1.5
1.4
1.2
1.0
1.2
1.3
1.0
0.6
0.7
1.1
1.4
1.1
1.0
1.3
1.1
0.6
0.2
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.4
0.7
1.4
1.5
1.0
1.6
1.3
1.3
1.4
1.6
1.0
1.6
1.2
0.8
0.4
0.6
0.9
1.6
1.6
1.3
1.6
1.0
0.6
0.2
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.2
0.4
0.4
0.4
0.3
0.5
0.3
0.4
0.3
0.4
0.3
0.3
0.2
0.3
0.4
0.5
0.5
0.4
0.6
0.5
0.4
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.2
0.2
0.2
0.1
0.1
0.1
0.2
0.3
0.2
0.1
0.1
0.1
0.1
0.1
0.2
0.3
0.3
0.2
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.2
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.0
0.0
0.1
0.2
0.1
0.1
0.2
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sheet 1 of 2
333 Pleasant Valley Road
South Windsor, CT 06074
(860) 282-0597
263 Winn Street
Burlington, MA 01803
(781) 935-8500
Drawing Number:
Detail: Photometric Calculation
Date: 07/27/2026
Revision:A
Scale:  1"=20'
Drawn By: MGS
Project:
37 Hartford Ave
Grandby, CT
Sheet 1 of 2
SL-1

Page 41

333 Pleasant Valley Road
South Windsor, CT 06074
(860) 282-0597
263 Winn Street
Burlington, MA 01803
(781) 935-8500
Drawing Number:
WP4/W4F - BEACON RATIO WALL
S4W / S5Q - VIPER AREA
Sheet 2 of 2
SL-2
Detail: Photometric Calculation
Date: 07/27/2026
Revision:A
Scale:  1"=20'
Drawn By: MGS
Project:
37 Hartford Ave
Grandby, CT

Page 42

DETAILS
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE_recover.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION D-1 A
SHRUB PLANTING DETAIL
TREE PLANTING DETAIL
ANTI-TRACKING APRON (AS REQ'D)
A
A
REINFORCED CONCRETE SIDEWALK SECTION
INLET PROTECTION - SEDIMENT FILTER SACK
MONOLITHIC CONCRETE CURB & SIDEWALK
BITUMINOUS CONCRETE PAVING DETAIL
SLOPE PROTECTION MATERIAL INSTALLATION (AS REQ'D)
6" BITUMINOUS CONCRETE LIP CURBING
HANDICAP PARKING STALL
EROSION CONTROL LOG
A. Town comments 8/4/26
STRAW BALE BARRIER

Page 43

DETAILS
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION D-2 A
TYPICAL SECTION - SEGMENTAL PRECAST CONCRETE RETAINING WALL
LIGHT POLE INSTALLATION DETAIL
DUMPSTER ENCLOSURE
STEEL BOLLARD WITH SIGN DETAIL
6' STANDARD SINGLE SIDE WHEEL STOP
A. Town comments 8/4/26
FENCEPOST TO RETAINING WALL ATTACHMENT
•
WOOD GUARDRAIL

Page 44

3-STORY RESIDENTIAL
BUILDING
±5,447 S.F. PER STORY
DETAILS
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION D-3 B
OUTLET CONTROL STRUCTURE (POCS-1)
INLET CONTROL STRUCTURE (PICS-1)
SUBSURFACE INFILTRATION BASIN  
CATCH BASIN
OR MANHOLE
SC-800 END CAP
OPTIONAL INSPECTION PORT
SC-800 CHAMBER
ONE LAYER OF ADSPLUS625 WOVEN GEOTEXTILE BETWEEN
FOUNDATION STONE AND CHAMBERS
5' MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS
24" (600 mm) HDPE ACCESS PIPE REQUIRED
USE END CAP PART #: SC800ECEZ
STORMTECH HIGHLY RECOMMENDS
FLEXSTORM INSERTS IN ANY UPSTREAM
STRUCTURES WITH OPEN GRATES
SUMP DEPTH TBD BY
SITE DESIGN ENGINEER
(24" MIN RECOMMENDED)
INSTALL FLAMP ON 24" (600 mm) ACESS PIPE
PART #: SC80024RAMP
ELEVATED BYPASS MANIFOLD
12" (300 mm) MIN 12"  MIN51"3" MINSUBGRADE SOILS
(SEE MANUFACTURER'S RECOMMENDATION)
PAVEMENT LAYER (DESIGNED
BY SITE DESIGN ENGINEER)
8' MAX
ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL
AROUND CLEAN, CRUSHED, ANGULAR STONE
*TO BOTTOM OF FLEXIBLE PAVEMENT. FOR
UNPAVED INSTALLATIONS WHERE RUTTING
FROM VEHICLES MAY OCCUR, INCREASE
COVER TO 21". 15"
6" MIN
EXCAVATION WALL
(CAN BE SLOPED OR VERTICAL)
PERIMETER STONE
(SEE MANUFACTURER'S RECOMMENDATION)
SC-800 END CAP
33"
6" MIN
GRANULAR WELL GRADED SOIL/AGGREGATE MIXTURES, <35%
FINES. COMPACT IN 6" LIFTS TO 95% STANDARD PROCTOR
DENSITY. SEE THE TABLE OF ACCEPTABLE FILL MATERIALS.
STORMTECH SC-800 ISOLATOR ROW DETAIL
STORMTECH SC-800 CROSS-SECTION
NOTE:
INSPECTION PORTS MAY BE CONNECTED THROUGH ANY CHAMBER CORRUGATION CREST.
STORMTECH CHAMBER
8" NYLOPLAST UNIVERSAL INLINE DRAIN
BODY (PART# 2708AG4IPKIT) OR TRAFFIC
RATED BOX W/SOLID LOCKING COVER
CONCRETE COLLAR
ASPHALT OVERLAY FOR
TRAFFIC APPLICATIONS
12" MIN WIDTH
8" MIN THICKNESS OF ASPHALT
OVERLAY AND CONCRETE COLLAR
CONCRETE COLLAR / ASPHALT OVERLAY
NOT REQUIRED FOR GREENSPACE OR
NON-TRAFFIC APPLICATIONS
4" SDR 35 PIPE
4" INSERTA TEE
TO BE CENTERED ON CORRUGATION CREST
NYLOPLAST 8" LOCKING SOLID
COVER AND FRAME
INSERTA TEE DETAIL
NTS
INSERTA TEE
CONNECTION
CONVEYANCE PIPE
MATERIAL MAY VARY
(PVC, HDPE, ETC.)
PLACE ADSPLUS WOVEN GEOTEXTILE
(CENTERED ON INSERTA-TEE INLET) OVER
BEDDING STONE FOR SCOUR PROTECTION AT
SIDE INLET CONNECTIONS. GEOTEXTILE MUST
EXTEND 6" PAST CHAMBER FOOT
INSERTA TEE TO BE
INSTALLED, CENTERED
OVER CORRUGATION
SIDE VIEWSECTION A-A
A
A
DO NOT INSTALL
INSERTA-TEE AT
CHAMBER JOINTS
NOTES:
· PART NUMBERS WILL VARY BASED ON INLET PIPE
MATERIALS. CONTACT STORMTECH FOR MORE
INFORMATION.
· CONTACT ADS ENGINEERING SERVICES IF INSERTA TEE
INLET MUST BE RAISED AS NOT ALL INVERTS ARE
POSSIBLE.
CHAMBER MAX DIAMETER OF INSERTA TEE HEIGHT FROM BASE OF CHAMBER (X)
SC-310 6" (150 mm) 4" (100 mm)
SC-800 10" (250 mm) 4" (100 mm)
DC-780 10" (250 mm) 4" (100 mm)
MC-3500 12" (300 mm) 6" (150 mm)
MC-4500 12" (300 mm) 8" (200 mm)
MC-7200 12" (300 mm) 8" (200 mm)
INSERTA TEE FITTINGS AVAILABLE FOR SDR 26, SDR 35, SCH 40 IPS
GASKETED & SOLVENT WELD, N-12, HP STORM, C-900 OR DUCTILE IRON
(X)
STORMTECH SC-800 INSPECTION PORT DETAIL STORMTECH INSERTA-TEE SIDE INLET DETAIL
A. Town comments 8/4/26
B. Drainage network & PICS-1 revisions 8/25/26

Page 45

DETAILS
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION D-4 A
(36" MIN)
7.08'
12" (MIN)
7.00'(MIN.)
[84.0"]
WATER QUALITY UNIT - BARRACUDA S4 (PWQU-1)
VARIABLE OUTLET LOCATIONS
VARIABLE INLET LOCATIONS
DOWNSPOUT COLLECTOR DETAIL
PRECAST CONCRETE CATCH BASIN
ADS NYLOPLAST YARD DRAIN BASIN
STANDARD DRAINAGE MANHOLE DETAIL
A. Revision to catch basin detail 8/25/26

Page 46

DETAILS
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE_recover.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION D-5 A
A. Town comments 8/4/26
SIGN SUMMARY

Page 47

COMPLIANCE NOTES
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION D-6 A
August 4, 2026
STORMWATER INSPECTION & MAINTENANCE PROCEDURE & CHECKLIST INVASIVE SPECIES MANAGEMENT PLAN
The following management measures shall be implemented for the proposed improvements at 37 Hartford Avenue. All invasive species management activities
shall be coordinated with a qualified professional experienced in the identification and treatment of invasive plant species.
a. Pre-Construction
Prior to the installation of mitigation plantings, the designated mitigation area shall be inspected by a qualified professional knowledgeable in the identification
of invasive plant species. Existing invasive vegetation shall be identified and clearly marked for the contractor or personnel responsible for removal.
Targeted invasive plants, including root systems to the maximum extent practicable, shall be removed from the site and disposed of at an approved off-site
disposal facility. Hand removal methods shall be utilized whenever feasible to minimize disturbance to existing soils and native vegetation. Where hand removal
is not practical, a small excavator may be used, provided that disturbance to surrounding soils and vegetation is minimized to the greatest extent practicable.
b. During Construction
Construction activities shall be conducted in a manner that minimizes soil disturbance and prevents the spread of invasive plant material and propagules. The
following practices shall be implemented throughout construction:
1. Limit all earth disturbance to within the approved limits of work and installed erosion and sediment controls.
2. Clean construction equipment, vehicles, and landscaping equipment as necessary to remove soil, seeds, root fragments, and other plant material prior to
entering or leaving the project site.
3. Utilize only certified weed-free plant material, mulch, topsoil, and seed mixes obtained from reputable suppliers.
4. Avoid unnecessary disturbance or damage to existing native vegetation during invasive species removal and construction activities.
5. Immediately collect all invasive plant cuttings and removed material and place them directly into bags or covered containers for off-site disposal. Removed
material shall not be stockpiled on-site.
6. Under no circumstances shall invasive plant material, cuttings, or other vegetative debris be placed within or allowed to enter wetlands, watercourses, or
other regulated resource areas, even on a temporary basis.
c. Post-Construction Monitoring
Invasive species management shall continue following completion of construction for a minimum period of three (3) years or as required by the municipal
Inland Wetlands and Watercourses Commission.
The mitigation area shall be inspected at least twice annually, once during the spring growing season and once during the early fall, to identify the presence or
re-establishment of invasive plant species. Additional inspections may be conducted as necessary based on site conditions.
Any invasive species identified during the monitoring period shall be removed or treated in accordance with the procedures outlined in Section 2(d). Monitoring
shall also evaluate the successful establishment of native mitigation plantings and identify any maintenance measures necessary to ensure their long-term
success.
d. Invasive Species Treatment
Due to the proximity of regulated wetland resource areas, invasive plant species should be controlled using methods that minimize impacts to adjacent native
vegetation and sensitive environmental resources.
Removal by hand shall be the preferred treatment method where practical. During the active growing season, invasive plants should be cut by hand while in full
leaf to reduce their ability to photosynthesize and regenerate. Where appropriate, root systems shall be removed to the maximum extent practicable.
Herbicides are prohibited unless approval from the Town of Granby Inland Wetlands and Watercourses Commission is given. If approval is given, the Project
Proponent shall provide the Town of Granby Inland Wetlands Agent with the name, license information, and contact information of the licensed herbicide
applicator responsible for performing the work. Herbicide applications shall be performed in strict accordance with all applicable federal, state, and local
regulations, including those governing applications adjacent to wetlands and watercourses.
e. Reporting and Coordination
Upon completion of each invasive species management event, the Project Proponent or the Proponent's designated contractor shall notify the Town of Granby
Inland Wetlands and Watercourses Commission that the work has been completed.
Each notification shall include a brief summary describing:
· The date(s) the work was performed;
· The invasive species identified;
· The treatment methods implemented;
· Areas treated;
· Any herbicides applied, if applicable; and
· Recommendations for any follow-up monitoring or additional treatment.
The Project Proponent is encouraged to coordinate periodically with the Town of Granby Inland Wetlands Agent throughout the monitoring period to review the
effectiveness of management activities and identify any additional areas requiring treatment.
A. IWWA comments 8/25/26

Page 48

Page 49

Page 50

APPLICATION FOR INLAND 
WETLANDS & 
WATERCOURSES ACTIVITY
REQUEST FOR REVIEW
For submission from Nicholas Kimball & Marissa Nasshan
12 Northwoods Rd, North Granby, CT 06060
Submission topic- removing sediment from pond

Page 51

OVERVIEW MAP
 12 Northwoods- applicant & owner address/home pictured top left. 
Subject pond in middle of screen. Red circle depicting the area 
shown in following slides. 

Page 52

VEGETATION 
CONSUMING AREA 
AROUND CULVERT
This past summer with large volumes of rain water from the storms, 
a quite large volume of sediment has accumulated which then 
allowed vegetation to thrive. It is further slowing the normal stream 
flow and could cause a back up around the culvert with a significant 
storm. 

Page 53

SIDE ANGLE OF 
SUBJECT AREA
This subject area is the southwest corner of the pond of a square 
footage around 40 sq ft. 

Page 54

Page 55

THE TASK
 We’d like to remove the sediment depicted inside the red circle of 
this photo. We want to have an excavator come in and remove the 
sediment just enough to remove vegetation and to allow natural flow 
from the culvert at the bottom of the photo. 

Page 56

EVENTUAL REMEDIATION
Request to remove vegetation in future along hardscape areas. 

Page 57

PRECAUTIONS 
We don’t want to hurt wildlife in the pond. Any excavation will be strictly inside the depicted circle and of minimal 
depth in order to remove vegetation and elevated levels of sediment.
The excavator provider is equipped with a spill kit to prevent any potential leak run offs. 
We understand the towns interest in soil quality and its final disposition. We are open for the towns guidance. We 
can find a location elsewhere on our property to try and spread it out, or have it removed from property and provided 
to the town, or have it removed to a disposal site of our hauler. 

Page 58

FINAL NOTES
Thank you,
This is in conjunction with a Request for review document submitted 8/27/2026 to the Town of Granby, CT. 
This is in regards to the property of 
Nicholas Kimball & Marissa Nasshan
12 Northwoods Rd, North Granby, CT 06060
860-803-2061 cell  (Nicholas Kimball)
Email: kimballni@gmail.com

Page 59

Page 60

TOWN OF GRANBY
 Office of Community Development, Inland Wetlands and Watercourses Commission
Telephone: (860
) 844-5318, www.granby-ct.gov
Application for Inland Wetlands & Watercourses Activity
Application For: Permit  Extension  Modification (Existing Permit/Application #):  __________________________
Wetlands Map Amend. Request for Review Other: 
Property Location and Nearest Intersection: 
Size of Parcel:_________ Zone: ________ Map/Lot: ____________ Current Use: ___________________________
Applicant’s Name:  
Complete Address:
Daytime Phone:   Evening Phone:  Fax:
Email:
Owner’s Name:
If the owner is a corporation, or other non-individual entity, include the primary contact information
Complete Address:  
Phone Daytime Phone: Evening Phone: Fax:
Applicant’s Representative:
Complete Address:  
Daytime Phone: Evening Phone: Fax:
Wetlands Located on Property (in square feet (sq. ft.)):   Wetlands to be impacted (sq. ft.):
Watercourses Located on Property?  Name or Type of Watercourse:  
Are Proposed Activities Located within the 100-Year Floodplain?  Floodway?  
Are there slopes with grades in excess of 15% located on the property?  
Do Proposed Activities Require Review by the PZC?  
*********SEE APPLICATION CHECKLIST ON BACK for MINIMUM APPLICATION REQUIREMENTS**********
The applicant understands that this application is to be considered complete only when all information and documents required by 
the Commission have been submitted. The undersigned warrants the truth of all statements contained herein and in all supporting
documents according to the best of his/her knowledge and belief. Permission is granted to the Town of Granby, Inland Wetlands & 
Watercourses Commission, and its agent (s) to inspect the subject land, at reasonable times, during the pendency of an application 
and for the life of the permit. 
Applicant’s Signature: Date:
Owner’s Signature:  Date:
FOR OFFICE USE
Application #: Date Submitted: 
Fee amt./Check or Cash: Date of Receipt: 
Agent Ruling: Date Approved/Denied: 
See Reverse Side for Conditions of Approval or Reason for Denial
Property is located east and northeast of Salmon Brook Fall (Route 10) and Floyville Road Intersection.
53/78/28 Nursery I215.36
Broadleaf Solar, LLC
Broadleaf Solar, LLC
207-239-8782 207-239-8782
 Yes
01Mil +/-
X
No No
yes but not subject to the farming activities 
No
unnamed tributaries to Salmon Brook 
Jonathan Gravel
jon.gravel@desri.com
575 Fifth Ave., 24th Fl. | New York, NY 10017 
575 Fifth Ave., 24th Fl. | New York, NY 10017 
575 Fifth Ave., 24th Fl. | New York, NY 10017 
(212) 478-0000
(212) 478-0000
*******************************PLEASE ATTACH ADDITIONAL SH EET IF NECESSARY**************************************
Project Name and Brief Description (i.e. residential, agricultural, commercial, number of lots, etc.): In continuation of the ongoing seeding and site
stabilization efforts, and following dir
ection provided by the IWWC at its August meeting, Kevin Sullivan (local farmer) has begun implementing agronomic erosion-
control measures at four identified locations (refer to enclosed map)
. These measures are intended to stabilize areas of pre-existing erosion, reduce further soil loss, 
and prevent sediment from migrating 
off-site and into adjacent natural areas. The work has been prioritized as follows: 1.) Contain existing sedimentation through the 
installation of staked straw wattles. 2
). Manage stormwater runoff through the installation of temporary diversion swales and sediment traps.These agronomic measures 
are intended to slow and disperse st
ormwater runoff, promote natural infiltration, capture sediment, and prevent additional erosion. Kevin will contniue monitory and 
adjust accordingly. 
Is any portion of the property located within 500 feet of an adjoining municipality? 
g() p
HM001348
0000007472

Page 61

Page 62

Page 63

Page 64

Page 65

Page 66

Page 67

SALMON BROOK PARK
CONNECTOR TO AUXILARY PARKING
215 SALMON BROOK STREET
GRANBY, CONNECTICUT
INLAND WETLANDS APPLICATION
STATEWIDE INLAND WETLANDS & WATERCOURSES 
ACTIVITY REPORTING FORM
SEPTEMBER 3, 2026
KEVIN CLARK, PEL-TOWN ENGINEER

Page 68

 
CONTENTS: 
 
APPLICATION COVER SHEET 
 
PERMIT APPLICATION FOR INLAND WETLANDS & WATERCOURSE ACTIVITY 
 
APPLICATION CHECKLIST 
 
APPLICATION FEES (WORKSHEET) 
 
STATEWIDE INLAND WETLANDS & WATERCOURSES ACTIVITY REPORTING FORM 
 
NRCS SOIL REPORT 
 
PROJECT NARRATIVE 
 
MITIGATION NARRATIVE 
 
PLANS (9 SHEETS) 

Page 69

Page 70

Page 71

Page 72

United States
Department of
Agriculture
A product of the National
Cooperative Soil Survey,
a joint effort of the United
States Department of
Agriculture and other
Federal agencies, State
agencies including the
Agricultural Experiment
Stations, and local
participants
Custom Soil Resource 
Report for
State of 
Connecticut, 
Western Part
Salmon Brook Park-Sidewalk 
Extension
Natural
Resources
Conservation
Service
March 16, 2026

Page 73

Preface
Soil surveys contain information that affects land use planning in survey areas. 
They highlight soil limitations that affect various land uses and provide information 
about the properties of the soils in the survey areas. Soil surveys are designed for 
many different users, including farmers, ranchers, foresters, agronomists, urban 
planners, community officials, engineers, developers, builders, and home buyers. 
Also, conservationists, teachers, students, and specialists in recreation, waste 
disposal, and pollution control can use the surveys to help them understand, 
protect, or enhance the environment.
Various land use regulations of Federal, State, and local governments may impose 
special restrictions on land use or land treatment. Soil surveys identify soil 
properties that are used in making various land use or land treatment decisions. 
The information is intended to help the land users identify and reduce the effects of 
soil limitations on various land uses. The landowner or user is responsible for 
identifying and complying with existing laws and regulations.
Although soil survey information can be used for general farm, local, and wider area 
planning, onsite investigation is needed to supplement this information in some 
cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/
portal/nrcs/main/soils/health/) and certain conservation and engineering 
applications. For more detailed information, contact your local USDA Service Center 
(https://offices.sc.egov.usda.gov/locator/app?agency=nrcs) or your NRCS State Soil 
Scientist (http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/contactus/?
cid=nrcs142p2_053951).
Great differences in soil properties can occur within short distances. Some soils are 
seasonally wet or subject to flooding. Some are too unstable to be used as a 
foundation for buildings or roads. Clayey or wet soils are poorly suited to use as 
septic tank absorption fields. A high water table makes a soil poorly suited to 
basements or underground installations.
The National Cooperative Soil Survey is a joint effort of the United States 
Department of Agriculture and other Federal agencies, State agencies including the 
Agricultural Experiment Stations, and local agencies. The Natural Resources 
Conservation Service (NRCS) has leadership for the Federal part of the National 
Cooperative Soil Survey.
Information about soils is updated periodically. Updated information is available 
through the NRCS Web Soil Survey, the site for official soil survey information.
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its 
programs and activities on the basis of race, color, national origin, age, disability, 
and where applicable, sex, marital status, familial status, parental status, religion, 
sexual orientation, genetic information, political beliefs, reprisal, or because all or a 
part of an individual's income is derived from any public assistance program. (Not 
all prohibited bases apply to all programs.) Persons with disabilities who require 
2

Page 74

alternative means for communication of program information (Braille, large print, 
audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice 
and TDD). To file a complaint of discrimination, write to USDA, Director, Office of 
Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or 
call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity 
provider and employer.
3

Page 75

Contents
Preface.................................................................................................................... 2
How Soil Surveys Are Made..................................................................................5
Soil Map.................................................................................................................. 8
Soil Map................................................................................................................9
Legend................................................................................................................10
Map Unit Legend................................................................................................ 11
Map Unit Descriptions.........................................................................................11
State of Connecticut, Western Part.................................................................13
29A—Agawam fine sandy loam, 0 to 3 percent slopes...............................13
38C—Hinckley loamy sand, 3 to 15 percent slopes....................................14
38E—Hinckley loamy sand, 15 to 45 percent slopes..................................16
100—Suncook loamy fine sand...................................................................19
101—Occum fine sandy loam..................................................................... 20
105—Hadley silt loam................................................................................. 22
106—Winooski silt loam..............................................................................24
References............................................................................................................26
4

Page 76

How Soil Surveys Are Made
Soil surveys are made to provide information about the soils and miscellaneous 
areas in a specific area. They include a description of the soils and miscellaneous 
areas and their location on the landscape and tables that show soil properties and 
limitations affecting various uses. Soil scientists observed the steepness, length, 
and shape of the slopes; the general pattern of drainage; the kinds of crops and 
native plants; and the kinds of bedrock. They observed and described many soil 
profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The 
profile extends from the surface down into the unconsolidated material in which the 
soil formed or from the surface down to bedrock. The unconsolidated material is 
devoid of roots and other living organisms and has not been changed by other 
biological activity.
Currently, soils are mapped according to the boundaries of major land resource 
areas (MLRAs). MLRAs are geographically associated land resource units that 
share common characteristics related to physiography, geology, climate, water 
resources, soils, biological resources, and land uses (USDA, 2006). Soil survey 
areas typically consist of parts of one or more MLRA.
The soils and miscellaneous areas in a survey area occur in an orderly pattern that 
is related to the geology, landforms, relief, climate, and natural vegetation of the 
area. Each kind of soil and miscellaneous area is associated with a particular kind 
of landform or with a segment of the landform. By observing the soils and 
miscellaneous areas in the survey area and relating their position to specific 
segments of the landform, a soil scientist develops a concept, or model, of how they 
were formed. Thus, during mapping, this model enables the soil scientist to predict 
with a considerable degree of accuracy the kind of soil or miscellaneous area at a 
specific location on the landscape.
Commonly, individual soils on the landscape merge into one another as their 
characteristics gradually change. To construct an accurate soil map, however, soil 
scientists must determine the boundaries between the soils. They can observe only 
a limited number of soil profiles. Nevertheless, these observations, supplemented 
by an understanding of the soil-vegetation-landscape relationship, are sufficient to 
verify predictions of the kinds of soil in an area and to determine the boundaries.
Soil scientists recorded the characteristics of the soil profiles that they studied. They 
noted soil color, texture, size and shape of soil aggregates, kind and amount of rock 
fragments, distribution of plant roots, reaction, and other features that enable them 
to identify soils. After describing the soils in the survey area and determining their 
properties, the soil scientists assigned the soils to taxonomic classes (units). 
Taxonomic classes are concepts. Each taxonomic class has a set of soil 
characteristics with precisely defined limits. The classes are used as a basis for 
comparison to classify soils systematically. Soil taxonomy, the system of taxonomic 
classification used in the United States, is based mainly on the kind and character 
of soil properties and the arrangement of horizons within the profile. After the soil 
5

Page 77

scientists classified and named the soils in the survey area, they compared the 
individual soils with similar soils in the same taxonomic class in other areas so that 
they could confirm data and assemble additional data based on experience and 
research.
The objective of soil mapping is not to delineate pure map unit components; the 
objective is to separate the landscape into landforms or landform segments that 
have similar use and management requirements. Each map unit is defined by a 
unique combination of soil components and/or miscellaneous areas in predictable 
proportions. Some components may be highly contrasting to the other components 
of the map unit. The presence of minor components in a map unit in no way 
diminishes the usefulness or accuracy of the data. The delineation of such 
landforms and landform segments on the map provides sufficient information for the 
development of resource plans. If intensive use of small areas is planned, onsite 
investigation is needed to define and locate the soils and miscellaneous areas.
Soil scientists make many field observations in the process of producing a soil map. 
The frequency of observation is dependent upon several factors, including scale of 
mapping, intensity of mapping, design of map units, complexity of the landscape, 
and experience of the soil scientist. Observations are made to test and refine the 
soil-landscape model and predictions and to verify the classification of the soils at 
specific locations. Once the soil-landscape model is refined, a significantly smaller 
number of measurements of individual soil properties are made and recorded. 
These measurements may include field measurements, such as those for color, 
depth to bedrock, and texture, and laboratory measurements, such as those for 
content of sand, silt, clay, salt, and other components. Properties of each soil 
typically vary from one point to another across the landscape.
Observations for map unit components are aggregated to develop ranges of 
characteristics for the components. The aggregated values are presented. Direct 
measurements do not exist for every property presented for every map unit 
component. Values for some properties are estimated from combinations of other 
properties.
While a soil survey is in progress, samples of some of the soils in the area generally 
are collected for laboratory analyses and for engineering tests. Soil scientists 
interpret the data from these analyses and tests as well as the field-observed 
characteristics and the soil properties to determine the expected behavior of the 
soils under different uses. Interpretations for all of the soils are field tested through 
observation of the soils in different uses and under different levels of management. 
Some interpretations are modified to fit local conditions, and some new 
interpretations are developed to meet local needs. Data are assembled from other 
sources, such as research information, production records, and field experience of 
specialists. For example, data on crop yields under defined levels of management 
are assembled from farm records and from field or plot experiments on the same 
kinds of soil.
Predictions about soil behavior are based not only on soil properties but also on 
such variables as climate and biological activity. Soil conditions are predictable over 
long periods of time, but they are not predictable from year to year. For example, 
soil scientists can predict with a fairly high degree of accuracy that a given soil will 
have a high water table within certain depths in most years, but they cannot predict 
that a high water table will always be at a specific level in the soil on a specific date.
After soil scientists located and identified the significant natural bodies of soil in the 
survey area, they drew the boundaries of these bodies on aerial photographs and 
Custom Soil Resource Report
6

Page 78

identified each as a specific map unit. Aerial photographs show trees, buildings, 
fields, roads, and rivers, all of which help in locating boundaries accurately.
Custom Soil Resource Report
7

Page 79

Soil Map
The soil map section includes the soil map for the defined area of interest, a list of 
soil map units on the map and extent of each map unit, and cartographic symbols 
displayed on the map. Also presented are various metadata about data used to 
produce the map, and a description of each soil map unit.
8

Page 80

9
Custom Soil Resource Report
Soil Map
4646300 4646400 4646500 4646600 4646700 4646800 4646900 4647000
4646300 4646400 4646500 4646600 4646700 4646800 4646900 4647000
681800 681900 682000 682100 682200 682300 682400 682500 682600 682700 682800 682900
681900 682000 682100 682200 682300 682400 682500 682600 682700 682800 682900 683000
41°  57' 14'' N
72°  48' 23'' W
41°  57' 14'' N
72°  47' 31'' W
41°  56' 49'' N
72°  48' 23'' W
41°  56' 49'' N
72°  47' 31'' WN
Map projection: Web Mercator   Corner coordinates: WGS84   Edge tics: UTM Zone 18N WGS84
0 250 500 1000 1500
Feet
0 50 100 200 300
Meters
Map Scale: 1:5,500 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.

Page 81

MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at 
1:12,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause 
misunderstanding of the detail of mapping and accuracy of soil 
line placement. The maps do not show the small areas of 
contrasting soils that could have been shown at a more detailed 
scale.
Please rely on the bar scale on each map sheet for map 
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL: 
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator 
projection, which preserves direction and shape but distorts 
distance and area. A projection that preserves area, such as the 
Albers equal-area conic projection, should be used if more 
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as 
of the version date(s) listed below.
Soil Survey Area: State of Connecticut, Western Part
Survey Area Data: Version 6, Sep 16, 2025
Soil map units are labeled (as space allows) for map scales 
1:50,000 or larger.
Date(s) aerial images were photographed: Jun 14, 2022—Jul 1, 
2024
The orthophoto or other base map on which the soil lines were 
compiled and digitized probably differs from the background 
imagery displayed on these maps. As a result, some minor 
shifting of map unit boundaries may be evident.
Custom Soil Resource Report
10

Page 82

Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
29A Agawam fine sandy loam, 0 to 3 
percent slopes
4.7 7.5%
38C Hinckley loamy sand, 3 to 15 
percent slopes
2.5 4.0%
38E Hinckley loamy sand, 15 to 45 
percent slopes
9.2 14.6%
100 Suncook loamy fine sand 11.6 18.6%
101 Occum fine sandy loam 28.1 44.9%
105 Hadley silt loam 5.8 9.3%
106 Winooski silt loam 0.7 1.1%
Totals for Area of Interest 62.6 100.0%
Map Unit Descriptions
The map units delineated on the detailed soil maps in a soil survey represent the 
soils or miscellaneous areas in the survey area. The map unit descriptions, along 
with the maps, can be used to determine the composition and properties of a unit.
A map unit delineation on a soil map represents an area dominated by one or more 
major kinds of soil or miscellaneous areas. A map unit is identified and named 
according to the taxonomic classification of the dominant soils. Within a taxonomic 
class there are precisely defined limits for the properties of the soils. On the 
landscape, however, the soils are natural phenomena, and they have the 
characteristic variability of all natural phenomena. Thus, the range of some 
observed properties may extend beyond the limits defined for a taxonomic class. 
Areas of soils of a single taxonomic class rarely, if ever, can be mapped without 
including areas of other taxonomic classes. Consequently, every map unit is made 
up of the soils or miscellaneous areas for which it is named and some minor 
components that belong to taxonomic classes other than those of the major soils.
Most minor soils have properties similar to those of the dominant soil or soils in the 
map unit, and thus they do not affect use and management. These are called 
noncontrasting, or similar, components. They may or may not be mentioned in a 
particular map unit description. Other minor components, however, have properties 
and behavioral characteristics divergent enough to affect use or to require different 
management. These are called contrasting, or dissimilar, components. They 
generally are in small areas and could not be mapped separately because of the 
scale used. Some small areas of strongly contrasting soils or miscellaneous areas 
are identified by a special symbol on the maps. If included in the database for a 
given area, the contrasting minor components are identified in the map unit 
descriptions along with some characteristics of each. A few areas of minor 
components may not have been observed, and consequently they are not 
mentioned in the descriptions, especially where the pattern was so complex that it 
Custom Soil Resource Report
11

Page 83

was impractical to make enough observations to identify all the soils and 
miscellaneous areas on the landscape.
The presence of minor components in a map unit in no way diminishes the 
usefulness or accuracy of the data. The objective of mapping is not to delineate 
pure taxonomic classes but rather to separate the landscape into landforms or 
landform segments that have similar use and management requirements. The 
delineation of such segments on the map provides sufficient information for the 
development of resource plans. If intensive use of small areas is planned, however, 
onsite investigation is needed to define and locate the soils and miscellaneous 
areas.
An identifying symbol precedes the map unit name in the map unit descriptions. 
Each description includes general facts about the unit and gives important soil 
properties and qualities.
Soils that have profiles that are almost alike make up a soil series. Except for 
differences in texture of the surface layer, all the soils of a series have major 
horizons that are similar in composition, thickness, and arrangement.
Soils of one series can differ in texture of the surface layer, slope, stoniness, 
salinity, degree of erosion, and other characteristics that affect their use. On the 
basis of such differences, a soil series is divided into soil phases. Most of the areas 
shown on the detailed soil maps are phases of soil series. The name of a soil phase 
commonly indicates a feature that affects use or management. For example, Alpha 
silt loam, 0 to 2 percent slopes, is a phase of the Alpha series.
Some map units are made up of two or more major soils or miscellaneous areas. 
These map units are complexes, associations, or undifferentiated groups.
A complex consists of two or more soils or miscellaneous areas in such an intricate 
pattern or in such small areas that they cannot be shown separately on the maps. 
The pattern and proportion of the soils or miscellaneous areas are somewhat similar 
in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example.
An association is made up of two or more geographically associated soils or 
miscellaneous areas that are shown as one unit on the maps. Because of present 
or anticipated uses of the map units in the survey area, it was not considered 
practical or necessary to map the soils or miscellaneous areas separately. The 
pattern and relative proportion of the soils or miscellaneous areas are somewhat 
similar. Alpha-Beta association, 0 to 2 percent slopes, is an example.
An undifferentiated group is made up of two or more soils or miscellaneous areas 
that could be mapped individually but are mapped as one unit because similar 
interpretations can be made for use and management. The pattern and proportion 
of the soils or miscellaneous areas in a mapped area are not uniform. An area can 
be made up of only one of the major soils or miscellaneous areas, or it can be made 
up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example.
Some surveys include miscellaneous areas. Such areas have little or no soil 
material and support little or no vegetation. Rock outcrop is an example.
Custom Soil Resource Report
12

Page 84

State of Connecticut, Western Part
29A—Agawam fine sandy loam, 0 to 3 percent slopes
Map Unit Setting
National map unit symbol: 2tyqw
Landscape: Valleys, outwash plains
Elevation: 0 to 1,040 feet
Mean annual precipitation: 36 to 71 inches
Mean annual air temperature: 39 to 55 degrees F
Frost-free period: 140 to 250 days
Farmland classification: All areas are prime farmland
Map Unit Composition
Agawam and similar soils: 85 percent
Minor components: 15 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Agawam
Setting
Landscape: Valleys, outwash plains
Landform: Moraines, Kames, Kame terraces, Outwash plains, Outwash terraces
Landform position (two-dimensional): Summit, shoulder, backslope, footslope
Landform position (three-dimensional): Side slope, crest, riser, tread, rise, dip
Down-slope shape: Convex
Across-slope shape: Convex
Parent material: Coarse-loamy eolian deposits over sandy and gravelly 
glaciofluvial deposits derived from gneiss, granite, schist, and/or phyllite
Typical profile
Ap - 0 to 11 inches: fine sandy loam
Bw1 - 11 to 16 inches: fine sandy loam
Bw2 - 16 to 26 inches: fine sandy loam
2C1 - 26 to 39 inches: loamy fine sand
2C2 - 39 to 55 inches: loamy fine sand
2C3 - 55 to 65 inches: loamy sand
Properties and qualities
Slope: 0 to 3 percent
Depth to restrictive feature: 15 to 35 inches to strongly contrasting textural 
stratification
Drainage class: Well drained
Runoff class: Very low
Capacity of the most limiting layer to transmit water (Ksat): Moderately low to high 
(0.14 to 14.17 in/hr)
Depth to water table: More than 80 inches
Frequency of flooding: None
Frequency of ponding: None
Maximum salinity: Nonsaline (0.0 to 1.9 mmhos/cm)
Available water supply, 0 to 60 inches: Low (about 3.4 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 2s
Custom Soil Resource Report
13

Page 85

Hydrologic Soil Group: B
Ecological site: F145XY008MA - Dry Outwash
Hydric soil rating: No
Minor Components
Ninigret
Percent of map unit: 5 percent
Landscape: Valleys
Landform: Terraces
Down-slope shape: Linear
Across-slope shape: Concave
Hydric soil rating: No
Windsor
Percent of map unit: 4 percent
Landscape: Valleys
Landform: Dunes, Deltas, Outwash terraces, Outwash plains
Landform position (three-dimensional): Tread, riser
Down-slope shape: Convex, linear
Across-slope shape: Convex, linear
Hydric soil rating: No
Walpole
Percent of map unit: 3 percent
Landscape: Outwash plains
Landform: Deltas, Depressions, Outwash terraces, Depressions, Outwash plains
Landform position (two-dimensional): Toeslope
Landform position (three-dimensional): Tread, talf, dip
Down-slope shape: Concave
Across-slope shape: Concave
Hydric soil rating: Yes
Hinckley
Percent of map unit: 3 percent
Landscape: Outwash plains, valleys
Landform: Deltas, Kames, Eskers, Outwash plains
Landform position (two-dimensional): Summit, shoulder, backslope
Landform position (three-dimensional): Head slope, nose slope, side slope, crest, 
rise
Down-slope shape: Convex
Across-slope shape: Convex, linear
Hydric soil rating: No
38C—Hinckley loamy sand, 3 to 15 percent slopes
Map Unit Setting
National map unit symbol: 2svmb
Landscape: Uplands, valleys
Elevation: 0 to 1,290 feet
Mean annual precipitation: 36 to 71 inches
Custom Soil Resource Report
14

Page 86

Mean annual air temperature: 39 to 55 degrees F
Frost-free period: 140 to 240 days
Farmland classification: Farmland of statewide importance
Map Unit Composition
Hinckley and similar soils: 85 percent
Minor components: 15 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Hinckley
Setting
Landscape: Uplands, valleys
Landform: Outwash deltas, Outwash terraces, Moraines, Eskers, Kames, 
Outwash plains, Kame terraces
Landform position (two-dimensional): Summit, shoulder, backslope, footslope, 
toeslope
Landform position (three-dimensional): Head slope, nose slope, side slope, crest, 
riser, tread
Down-slope shape: Concave, convex, linear
Across-slope shape: Convex, linear, concave
Parent material: Sandy and gravelly glaciofluvial deposits derived from gneiss 
and/or granite and/or schist
Typical profile
Oe - 0 to 1 inches: moderately decomposed plant material
A - 1 to 8 inches: loamy sand
Bw1 - 8 to 11 inches: gravelly loamy sand
Bw2 - 11 to 16 inches: gravelly loamy sand
BC - 16 to 19 inches: very gravelly loamy sand
C - 19 to 65 inches: very gravelly sand
Properties and qualities
Slope: 3 to 15 percent
Depth to restrictive feature: More than 80 inches
Drainage class: Excessively drained
Runoff class: Very low
Capacity of the most limiting layer to transmit water (Ksat): Moderately high to 
very high (1.42 to 99.90 in/hr)
Depth to water table: More than 80 inches
Frequency of flooding: None
Frequency of ponding: None
Maximum salinity: Nonsaline (0.0 to 1.9 mmhos/cm)
Available water supply, 0 to 60 inches: Low (about 3.1 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 4e
Hydrologic Soil Group: A
Ecological site: F144AY022MA - Dry Outwash
Hydric soil rating: No
Minor Components
Windsor
Percent of map unit: 5 percent
Landscape: Uplands, valleys
Custom Soil Resource Report
15

Page 87

Landform: Moraines, Eskers, Kames, Outwash deltas, Outwash terraces, 
Outwash plains, Kame terraces
Landform position (two-dimensional): Summit, shoulder, backslope, footslope, 
toeslope
Landform position (three-dimensional): Head slope, nose slope, side slope, crest, 
riser, tread
Down-slope shape: Concave, convex, linear
Across-slope shape: Convex, linear, concave
Hydric soil rating: No
Merrimac
Percent of map unit: 5 percent
Landscape: Valleys, outwash plains
Landform: Kames, Outwash plains, Outwash terraces, Moraines, Eskers
Landform position (two-dimensional): Summit, shoulder, backslope, footslope, 
toeslope
Landform position (three-dimensional): Head slope, nose slope, side slope, crest, 
riser, tread
Down-slope shape: Convex
Across-slope shape: Convex
Hydric soil rating: No
Agawam
Percent of map unit: 3 percent
Landscape: Uplands, valleys
Landform: Eskers, Kames, Outwash plains, Kame terraces, Outwash deltas, 
Outwash terraces, Moraines
Landform position (two-dimensional): Summit, shoulder, backslope, toeslope, 
footslope
Landform position (three-dimensional): Head slope, nose slope, side slope, crest, 
riser, tread
Down-slope shape: Concave, convex, linear
Across-slope shape: Convex, linear, concave
Hydric soil rating: No
Sudbury
Percent of map unit: 2 percent
Landscape: Valleys, uplands
Landform: Outwash deltas, Moraines, Outwash plains, Kame terraces, Outwash 
terraces
Landform position (two-dimensional): Backslope, footslope
Landform position (three-dimensional): Base slope, tread
Down-slope shape: Concave, linear
Across-slope shape: Concave, linear
Hydric soil rating: No
38E—Hinckley loamy sand, 15 to 45 percent slopes
Map Unit Setting
National map unit symbol: 2svmj
Custom Soil Resource Report
16

Page 88

Landscape: Uplands, valleys
Elevation: 0 to 1,280 feet
Mean annual precipitation: 36 to 71 inches
Mean annual air temperature: 39 to 55 degrees F
Frost-free period: 140 to 240 days
Farmland classification: Not prime farmland
Map Unit Composition
Hinckley and similar soils: 85 percent
Minor components: 15 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Hinckley
Setting
Landscape: Uplands, valleys
Landform: Eskers, Kames, Outwash deltas, Outwash terraces, Moraines, 
Outwash plains, Kame terraces
Landform position (two-dimensional): Backslope
Landform position (three-dimensional): Head slope, nose slope, side slope, crest, 
riser
Down-slope shape: Concave, convex, linear
Across-slope shape: Convex, linear, concave
Parent material: Sandy and gravelly glaciofluvial deposits derived from gneiss 
and/or granite and/or schist
Typical profile
Oe - 0 to 1 inches: moderately decomposed plant material
A - 1 to 8 inches: loamy sand
Bw1 - 8 to 11 inches: gravelly loamy sand
Bw2 - 11 to 16 inches: gravelly loamy sand
BC - 16 to 19 inches: very gravelly loamy sand
C - 19 to 65 inches: very gravelly sand
Properties and qualities
Slope: 15 to 45 percent
Depth to restrictive feature: More than 80 inches
Drainage class: Excessively drained
Runoff class: Low
Capacity of the most limiting layer to transmit water (Ksat): Moderately high to 
very high (1.42 to 99.90 in/hr)
Depth to water table: More than 80 inches
Frequency of flooding: None
Frequency of ponding: None
Maximum salinity: Nonsaline (0.0 to 1.9 mmhos/cm)
Available water supply, 0 to 60 inches: Low (about 3.1 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 7e
Hydrologic Soil Group: A
Ecological site: F144AY022MA - Dry Outwash
Hydric soil rating: No
Custom Soil Resource Report
17

Page 89

Minor Components
Windsor
Percent of map unit: 5 percent
Landscape: Uplands, valleys
Landform: Eskers, Kames, Moraines, Outwash deltas, Outwash terraces, 
Outwash plains, Kame terraces
Landform position (two-dimensional): Backslope
Landform position (three-dimensional): Head slope, nose slope, side slope, crest, 
riser
Down-slope shape: Concave, convex, linear
Across-slope shape: Convex, linear, concave
Hydric soil rating: No
Merrimac
Percent of map unit: 5 percent
Landscape: Valleys, outwash plains
Landform: Outwash plains, Outwash terraces, Moraines, Eskers, Kames
Landform position (two-dimensional): Backslope
Landform position (three-dimensional): Head slope, nose slope, side slope, crest, 
riser
Down-slope shape: Convex
Across-slope shape: Convex
Hydric soil rating: No
Agawam
Percent of map unit: 3 percent
Landscape: Uplands, valleys
Landform: Eskers, Kame terraces, Outwash deltas, Outwash terraces, Moraines, 
Kames, Outwash plains
Landform position (two-dimensional): Backslope
Landform position (three-dimensional): Head slope, nose slope, side slope, crest, 
riser
Down-slope shape: Concave, convex, linear
Across-slope shape: Convex, linear, concave
Hydric soil rating: No
Sudbury
Percent of map unit: 2 percent
Landscape: Valleys, uplands
Landform: Kames, Eskers, Outwash deltas, Outwash plains, Kame terraces, 
Outwash terraces, Moraines
Landform position (two-dimensional): Backslope, footslope
Landform position (three-dimensional): Base slope, tread
Down-slope shape: Concave, linear
Across-slope shape: Linear, concave
Hydric soil rating: No
Custom Soil Resource Report
18

Page 90

100—Suncook loamy fine sand
Map Unit Setting
National map unit symbol: 9ljl
Elevation: 0 to 1,200 feet
Mean annual precipitation: 43 to 54 inches
Mean annual air temperature: 45 to 55 degrees F
Frost-free period: 140 to 185 days
Farmland classification: Farmland of statewide importance
Map Unit Composition
Suncook and similar soils: 80 percent
Minor components: 20 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Suncook
Setting
Landform: Flood plains
Down-slope shape: Linear
Across-slope shape: Convex
Parent material: Sandy alluvium
Typical profile
Ap - 0 to 7 inches: loamy fine sand
C1 - 7 to 15 inches: stratified coarse sand to loamy fine sand
C2 - 15 to 22 inches: stratified coarse sand to loamy fine sand
C3 - 22 to 32 inches: stratified coarse sand to loamy fine sand
C4 - 32 to 42 inches: stratified coarse sand to loamy fine sand
C5 - 42 to 65 inches: stratified gravelly coarse sand to loamy fine sand
Properties and qualities
Slope: 0 to 3 percent
Depth to restrictive feature: More than 80 inches
Drainage class: Excessively drained
Runoff class: Very low
Capacity of the most limiting layer to transmit water (Ksat): High to very high (5.95 
to 99.62 in/hr)
Depth to water table: About 60 to 72 inches
Frequency of flooding: Occasional
Frequency of ponding: None
Available water supply, 0 to 60 inches: Low (about 3.1 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 2s
Hydrologic Soil Group: A
Ecological site: F144AY006CT - High Floodplain Levee
Hydric soil rating: No
Custom Soil Resource Report
19

Page 91

Minor Components
Occum
Percent of map unit: 5 percent
Landform: Flood plains
Down-slope shape: Linear
Across-slope shape: Linear
Hydric soil rating: No
Pootatuck
Percent of map unit: 5 percent
Landform: Flood plains
Down-slope shape: Linear
Across-slope shape: Concave
Hydric soil rating: No
Unnamed, no flooding
Percent of map unit: 4 percent
Hydric soil rating: No
Saco
Percent of map unit: 3 percent
Landform: Flood plains
Down-slope shape: Concave
Across-slope shape: Concave
Hydric soil rating: Yes
Rippowam
Percent of map unit: 3 percent
Landform: Flood plains
Down-slope shape: Linear
Across-slope shape: Concave
Hydric soil rating: Yes
101—Occum fine sandy loam
Map Unit Setting
National map unit symbol: 9ljm
Elevation: 0 to 1,200 feet
Mean annual precipitation: 43 to 54 inches
Mean annual air temperature: 45 to 55 degrees F
Frost-free period: 140 to 185 days
Farmland classification: All areas are prime farmland
Map Unit Composition
Occum and similar soils: 80 percent
Minor components: 20 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Custom Soil Resource Report
20

Page 92

Description of Occum
Setting
Landform: Flood plains
Down-slope shape: Linear
Across-slope shape: Linear
Parent material: Coarse-loamy alluvium
Typical profile
Ap - 0 to 10 inches: fine sandy loam
Bw1 - 10 to 17 inches: fine sandy loam
Bw2 - 17 to 28 inches: sandy loam
C1 - 28 to 32 inches: stratified very gravelly coarse sand to loamy fine sand
C2 - 32 to 42 inches: stratified very gravelly coarse sand to loamy fine sand
C3 - 42 to 65 inches: stratified very gravelly coarse sand to loamy fine sand
Properties and qualities
Slope: 0 to 3 percent
Depth to restrictive feature: More than 80 inches
Drainage class: Well drained
Runoff class: Very low
Capacity of the most limiting layer to transmit water (Ksat): Moderately high to 
high (0.57 to 5.95 in/hr)
Depth to water table: About 60 to 72 inches
Frequency of flooding: Occasional
Frequency of ponding: None
Available water supply, 0 to 60 inches: Low (about 5.4 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 1
Hydrologic Soil Group: B
Ecological site: F144AY010NH - Sandy High Floodplain
Hydric soil rating: No
Minor Components
Suncook
Percent of map unit: 5 percent
Landform: Flood plains
Down-slope shape: Linear
Across-slope shape: Convex
Hydric soil rating: No
Agawam
Percent of map unit: 5 percent
Landscape: Valleys
Landform: Terraces, Outwash plains
Down-slope shape: Linear
Across-slope shape: Linear
Hydric soil rating: No
Pootatuck
Percent of map unit: 5 percent
Landform: Flood plains
Down-slope shape: Linear
Across-slope shape: Concave
Custom Soil Resource Report
21

Page 93

Hydric soil rating: No
Rippowam
Percent of map unit: 5 percent
Landform: Flood plains
Down-slope shape: Linear
Across-slope shape: Concave
Hydric soil rating: Yes
105—Hadley silt loam
Map Unit Setting
National map unit symbol: 9ljr
Elevation: 0 to 1,200 feet
Mean annual precipitation: 43 to 54 inches
Mean annual air temperature: 45 to 55 degrees F
Frost-free period: 140 to 185 days
Farmland classification: All areas are prime farmland
Map Unit Composition
Hadley and similar soils: 80 percent
Minor components: 20 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Hadley
Setting
Landform: Flood plains
Down-slope shape: Linear
Across-slope shape: Linear
Parent material: Coarse-silty alluvium
Typical profile
Ap - 0 to 12 inches: silt loam
C1 - 12 to 29 inches: stratified very fine sand to silt loam
C2 - 29 to 40 inches: stratified very fine sand to silt loam
C3 - 40 to 45 inches: stratified sand to silt loam
C4 - 45 to 60 inches: stratified sand to silt loam
Properties and qualities
Slope: 0 to 3 percent
Depth to restrictive feature: More than 80 inches
Drainage class: Well drained
Runoff class: Low
Capacity of the most limiting layer to transmit water (Ksat): Moderately high to 
high (0.57 to 1.98 in/hr)
Depth to water table: About 60 to 72 inches
Frequency of flooding: Occasional
Frequency of ponding: None
Available water supply, 0 to 60 inches: High (about 11.0 inches)
Custom Soil Resource Report
22

Page 94

Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 1
Hydrologic Soil Group: B
Ecological site: F145XY001MA - Silty High Floodplain
Hydric soil rating: No
Minor Components
Winooski
Percent of map unit: 5 percent
Landform: Flood plains
Down-slope shape: Linear
Across-slope shape: Linear
Hydric soil rating: No
Bash
Percent of map unit: 5 percent
Landform: Flood plains
Down-slope shape: Concave
Across-slope shape: Concave
Hydric soil rating: Yes
Lim
Percent of map unit: 3 percent
Landform: Flood plains
Down-slope shape: Concave
Across-slope shape: Concave
Hydric soil rating: Yes
Unnamed, sand or gravel substratum
Percent of map unit: 3 percent
Hydric soil rating: No
Saco
Percent of map unit: 2 percent
Landform: Flood plains
Down-slope shape: Concave
Across-slope shape: Concave
Hydric soil rating: Yes
Limerick
Percent of map unit: 2 percent
Landform: Flood plains
Down-slope shape: Concave
Across-slope shape: Concave
Hydric soil rating: Yes
Custom Soil Resource Report
23

Page 95

106—Winooski silt loam
Map Unit Setting
National map unit symbol: 9ljs
Elevation: 0 to 1,200 feet
Mean annual precipitation: 43 to 54 inches
Mean annual air temperature: 45 to 55 degrees F
Frost-free period: 140 to 185 days
Farmland classification: All areas are prime farmland
Map Unit Composition
Winooski and similar soils: 80 percent
Minor components: 20 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Winooski
Setting
Landform: Flood plains
Down-slope shape: Linear
Across-slope shape: Linear
Parent material: Coarse-silty alluvium
Typical profile
Ap - 0 to 12 inches: silt loam
B1 - 12 to 18 inches: silt loam
B2 - 18 to 36 inches: silt loam
C3 - 36 to 52 inches: very fine sandy loam
C4 - 52 to 65 inches: silt loam
Properties and qualities
Slope: 0 to 3 percent
Depth to restrictive feature: More than 80 inches
Drainage class: Moderately well drained
Runoff class: Very low
Capacity of the most limiting layer to transmit water (Ksat): Moderately high to 
high (0.57 to 1.98 in/hr)
Depth to water table: About 16 to 36 inches
Frequency of flooding: Frequent
Frequency of ponding: None
Available water supply, 0 to 60 inches: High (about 11.4 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 2w
Hydrologic Soil Group: B/D
Ecological site: F145XY002MA - Silty Low Floodplain
Hydric soil rating: No
Custom Soil Resource Report
24

Page 96

Minor Components
Hadley
Percent of map unit: 5 percent
Landform: Flood plains
Down-slope shape: Linear
Across-slope shape: Linear
Hydric soil rating: No
Bash
Percent of map unit: 3 percent
Landform: Flood plains
Down-slope shape: Concave
Across-slope shape: Concave
Hydric soil rating: Yes
Lim
Percent of map unit: 3 percent
Landform: Flood plains
Down-slope shape: Concave
Across-slope shape: Concave
Hydric soil rating: Yes
Limerick
Percent of map unit: 3 percent
Landform: Flood plains
Down-slope shape: Concave
Across-slope shape: Concave
Hydric soil rating: Yes
Saco
Percent of map unit: 2 percent
Landform: Flood plains
Down-slope shape: Concave
Across-slope shape: Concave
Hydric soil rating: Yes
Unnamed, strongly acid ph
Percent of map unit: 2 percent
Hydric soil rating: No
Unnamed, sand or gravel substratum
Percent of map unit: 2 percent
Hydric soil rating: No
Custom Soil Resource Report
25

Page 97

References
American Association of State Highway and Transportation Officials (AASHTO). 
2004. Standard specifications for transportation materials and methods of sampling 
and testing. 24th edition.
American Society for Testing and Materials (ASTM). 2005. Standard classification of 
soils for engineering purposes. ASTM Standard D2487-00.
Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of 
wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife 
Service FWS/OBS-79/31.
Federal Register. July 13, 1994. Changes in hydric soils of the United States.
Federal Register. September 18, 2002. Hydric soils of the United States.
Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric 
soils in the United States.
National Research Council. 1995. Wetlands: Characteristics and boundaries.
Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. 
U.S. Department of Agriculture Handbook 18. http://www.nrcs.usda.gov/wps/portal/
nrcs/detail/national/soils/?cid=nrcs142p2_054262 
Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for 
making and interpreting soil surveys. 2nd edition. Natural Resources Conservation 
Service, U.S. Department of Agriculture Handbook 436. http://
www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053577 
Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of 
Agriculture, Natural Resources Conservation Service. http://
www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053580 
Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and 
Delaware Department of Natural Resources and Environmental Control, Wetlands 
Section.
United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of 
Engineers wetlands delineation manual. Waterways Experiment Station Technical 
Report Y-87-1.
United States Department of Agriculture, Natural Resources Conservation Service. 
National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/
home/?cid=nrcs142p2_053374 
United States Department of Agriculture, Natural Resources Conservation Service. 
National range and pasture handbook. http://www.nrcs.usda.gov/wps/portal/nrcs/
detail/national/landuse/rangepasture/?cid=stelprdb1043084 
26

Page 98

United States Department of Agriculture, Natural Resources Conservation Service. 
National soil survey handbook, title 430-VI. http://www.nrcs.usda.gov/wps/portal/
nrcs/detail/soils/scientists/?cid=nrcs142p2_054242 
United States Department of Agriculture, Natural Resources Conservation Service. 
2006. Land resource regions and major land resource areas of the United States, 
the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 
296. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?
cid=nrcs142p2_053624 
United States Department of Agriculture, Soil Conservation Service. 1961. Land 
capability classification. U.S. Department of Agriculture Handbook 210. http://
www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf 
Custom Soil Resource Report
27

Page 99

 
PROJECT NARRATIVE: 
 
THE PROPOSED PROJECT CONSISTS OF THE CONSTRUCTION OF A PEDESTRIAN WALKING 
PATH IN THE TOWN PARK.  THE PURPOSE OF THE WALK IS TO CONNECT THE EXISTING 
BITUMINOUS WALK WITH A NEW WALK THAT WILL PROVIDE AN ACCESSIBLE ROUTE TO 
THE ROVERS SOCCER FIELDS.  THE EXISTING WOODS TRAIL FROM THE PARKING LOT 
TO THE NORTHERNMOST FIELD WILL BE REBUILT IN IT'S CURRENT LOCATION.  A 
SERIES OF STAIRS WILL BE ADDED TO THE PATH TO EASE THE ASSENT OF THE STEEP 
SLOPE.   
 
THE PROJECT AREA IS APPROXIMATELY 25,580 S.F OF THE EXISTING 116 ACRE PARK.  
THE 5-FT WIDE NEW BITUMINOUS WALK WILL BE APPROXIMATELY 1514 FEET LONG 
COVERING 7680 SF AND WILL MOSTLY BE LOCATED IN EXISTING GRASSED AREAS.   
PROPOSED GRADES WILL MOSTLY MATCH THE EXISTING GRADES.  THE WALK WILL BE 
CONSTRUCTED OF BITUMINOUS CONCRETE AS IS INTENDED FOR PEDESTRIAN WALKING 
USE.  THE PROPOSED WOODS TRAIL WILL FOLLOW THE EXISTING ROUTE.  THE PATH 
WILL BE REBUILT AS A 6-FT WIDE STONE DUST PATH WITH STAIRS.  THE PATH IS 630-FT 
LONG AND COVERS APPROXIMATELY 3790 S.F. 
 
THE SITE CONTAINS APPROXIMATELY 2,693,000 SF (61.8 AC.) OF WETLAND SOILS AND 
WATERCOURSES.  THE WETLAND SOILS ARE OCCUM FINE SANDY LOAM AND SUNCOOK 
LOAMY FINE SAND WHICH ARE ALLUVIAL AND FLOOD PLAIN SOILS.  THEY ARE 
PRESENTLY COVERED BY 89,358 SF (2.1 AC.) OF IMPERVIOUS SURFACE.  
APPROXIMATELY 1,600 LF (8000 SF) OF BITUMINOUS WALK WILL BE LOCATED IN 
WETLAND (FLOODPLAIN) SOILS.  THE RECONSTRUCTED WOODS PATH WILL COVER 
APPROXIMATELY 2722 S.F. OF WETLANDS/REGULATED AREA.  IN ADDITION, A TOTAL 
OF 15,000 SF OF WETLAND (FLOODPLAIN) AREA WILL BE DISTURBED.  ALL EXCEPT 9960 
SF. WILL BE TEMPORARY. 
 
THE BALANCE OF THE SITE CONTAINS HINCKLEY GRAVELY SANDY LOAM SOILS OR IS 
HINCKLEY URBAN LAND COMPLEX.  OTHER THAN THE FLOOD PLAIN SOILS, THERE ARE 
NO SIGNIFICANT AREAS OF WETLAND SOILS. EXCEPT FOR THE AREA ADJACENT TO THE 
WEST BRANCH OF SALMON BROOK WHICH IS LOCATED ALONG THE WESTERLY BORDER 
OF THE PROJECT.  THERE ARE NO ACTIVITIES PROPOSED WITHIN THE BROOK AND 
EXISTING DRAINAGE PATTERNS WILL BE MAINTAINED. 
 
TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES WILL BE IMPLEMENTED 
DURING CONSTRUCTION.  THE ANTICIPATED CONSTRUCTION WILL BEGIN IN THE 
SPRING OF 2027 AND END IN THE FALL OF 2027. 
  

Page 100

 
Mitigation Narrative  
Impacts associated with the construction and maintenance of the proposed sidewalk and sitting 
areas are minimal, limited to the addition of impervious area within an alluvial wetland and the 
URA of the Salmon Brook. The area where the sidewalk will be installed is currently maintained 
lawn for recreation, and as part of the project the lawn area will be restored to native vegetation 
as designated by the following mitigation plan below and as depicted on the “Plan Town of 
Granby Salmon Brook Park Connector to Auxiliary Parking, 215 Salmon Brook Street, Granby, 
CT”, dated 9.3.26, cover sheet, C1-C4 and DE1-DE3, as amended.  
Potential impacts during construction are limited to sediment migration from the construction 
area into a regulated area. As seen during the first phase of the sidewalk, soil disturbance 
associated with this project is minimal and temporary. Barrier erosion controls will be 
temporarily placed as necessary to prevent sediment migration during precipitation events, and 
the area will be seeded and mulched as soon as possible. A quick germinating seed mix will 
provide for both rapid and long-term vegetative stabilization.   
This project could potentially fit the requirements of a nonregulated use, due to the goal of 
providing equitable outdoor recreation opportunities, however, it requires a good amount of 
disturbance and therefore a permit is requested. The town proposes to incorporate vegetation 
management and planting efforts at key areas along the project route. These areas were selected 
where areas could use deeply rooted vegetation for long-term soil stabilization measures adjacent 
to the Salmon Brook. Plantings in the chosen locations will provide additional vegetative buffers 
along Salmon Brook, aiding in long-term bank stability and park/project protection.  
Mitigation efforts shall be supervised daily during vegetation removal and planting operations by 
the Granby Wetlands Agent or the IWWC designee. These efforts shall include invasive species 
removal, soil stabilization plantings, and signage at a Salmon Brook access trail. The following 
describes the mitigation activities in detail for the project, including how each mitigation area 
shall be treated.  
Sitewide – Along the project route, all vines that are choking trees shall be cut at their base and 
an herbicide applied to the fresh cut stump. A cone sprayer or paint on method may be utilized 
and applied in accordance with all applicable laws.  
The extent of oriental bittersweet (Celastrus orbiculatus) in some locations is extensive, and 
complete eradication is highly unlikely due to the riverine location providing a constant seed 
source for potential species re-establishment. Therefore, a more realistic goal is to preserve 
mature trees that are being “strangled” by vines.  Vines do not need to be removed from the tree 
or the site but allowed to degrade in place.  
As directed by the supervising IWWC designee, target invasive species shall be removed and 
properly disposed. The target species includes but is not limited to large autumn olive 
(Elaeagnum umbellata) and multiflora rose (Rosa multiflora) species.  
Area 1- This area is adjacent to a bend in the Salmon Brook and is currently maintained 
lawn. To aid in preserving the upland area adjacent to the banks, 3 trees and 10 shrubs are 
recommended to be installed in this area. Included in this area are 3 perennial islands, each 
perennial island shall include 6 herbaceous plantings. It is recommended that the area 
continue to be mowed between the tree and shrubs for 2 years, or longer if approved, to 
prevent invasive species overgrowth. Once strong establishment of plantings, the area may 
no longer be mowed. All plantings shall be clearly staked.  
Area 2 – This area is vegetated but does not contain any canopy trees. It is proposed to 
install 1 tree in this location that is greater than 6 feet tall. An area around the tree 

Page 101

 
installation area shall be cleared of invasive species. Mowing around installed trees shall 
occur for 2 full growing seasons. 
Area 3 - This area is vegetated but does not contain any canopy trees. It is proposed to 
install 2 trees and 6 shrubs in this location that is greater than 6 feet tall. An area around the 
tree installation area shall be cleared of invasive species. Mowing around installed trees 
shall occur for 2 full growing seasons.  
Area 4 - This area is vegetated but does not contain any canopy trees. It is proposed to 
install 1 tree in this location that is greater than 6 feet tall. An area around the tree 
installation area shall be cleared of invasive species. Mowing around installed trees shall 
occur for 2 full growing seasons. 
Area 5 – Along the tree line, a line of herbaceous perennials are proposed to be installed. 
This will increase the root profile and reduce mowing in this critical location.  
Area 6 - This area is vegetated but does not contain any canopy trees. It is proposed to 
install 2 trees and 6 shrubs in this location that is greater than 6 feet tall. An area around the 
tree installation area shall be cleared of invasive species. Mowing around installed trees 
shall occur for 2 full growing seasons. 
 
 
Vegetation Planting Species Selection 
Trees: Red Maple (Acer rubrum), Shagbark Hickory (Carya ovata), American Elm (Ulmus 
americana), Cottonwood (Populus deltoides), and American Sycamore (Platanus occidentalis).  
Shrubs: Staghorn Sumac (Rhus typhina), Sweet Pepperbush (Clethra alnifolia), and Elderberry 
(Sambucus canadensis) 
Herbaceous Perennials: Common milkweed (Asclepias syriaca), Black-eyed Susan (Rudbeckia 
hirta), Brown-eyed Susan (Rudbeckia triloba) 
 
 

Page 102

Location Map
Scale:  1"=500'
TOWN OF GRANBY
SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING 
215 Salmon Brook Street
Granby, Connecticut
Date: September 3, 2026
INLAND WETLANDS PERMIT SET
Owner:
Town of Granby
15 North Granby Road
Granby, Connecticut 06035
Civil Engineer:
Kevin Clark, PEL
Town Engineer
15 North Granby Road
Granby, Connecticut 06035
(860) 844-5318
townengineer@granby-ct.gov
Surveyor:
BSC Group
665 Winding Brook Drive
Glastonbury, Connecticut 06033
(860) 652-8227 List of Drawings:
  -
Sheet OA-1
Sheet C-1 to C-4
Sheet DE-1 to DE-3
Cover
Overall Plan
Plan
Notes & Details
Site

Page 103

N/F
TOWN OF GRANBY
53 West Granby Road
Vol. 94 Pg. 21
map G-42 /block 74 /lot 99
N/F
TOWN OF GRANBY
53 West Granby Road
Vol. 94 Pg. 21
map G-42 /block 74 /lot 99
Approximate Edge of Water
Approximate Edge of Water
Approximate Edge of Water
Approximate Edge of Water
West Branch Salmon Brook
(PUBLIC VARIABLE WIDTH)
WEST GRANBY  ROAD  (S.R. #20)
West Branch Salmon Brook
N/F
Paul D. & Cathy A Biagini
51 West Granby Road
Vol. 353 Pg. 1086
map G-42 /block 74 /lot 98
N/F
Anthony Indino
47 West Granby Road
Vol. 423 Pg. 809
Vol. 420 Pg. 175
map G-42 /block 74 /lot 96
N/F
Thomas Randall Clay
45 West Granby Road
Vol. 221 Pg. 951
Vol. 190 Pg. 789map G-42 /block 74 /lot 95
N/F
William G. & Jonna L  Hallam
49 West Granby Road
Vol. 371 Pg. 1211
Vol. 349 Pg. 208
map G-42 /block 74 /lot 97
N/F
TOWN OF GRANBY
215 Salmon Brook Street
Vol. 74 Pg. 176
map H-42 /block 74 /lot 87
101
38E
29A
38C
29A
38E
38C
100
101
Approximate Edge of Water
Approximate Edge of WaterWest Branch Salmon Brook
EXIST. SOIL LINE
EXIST. PROP. LINE
INLAND WETLANDS REGULATED AREA
MATCH
MARK
MATCH
MARK
MATCH
MARK
MATCH
MARK
MATCH
MARK
MATCH
MARK
AREA 1
AREA 1
AREA 2
AREA 3
AREA 5
AREA 4
GRANBY TOWN HALL
15 NORTH GRANBY ROAD
GRANBY, CONNECTICUT 06035
PHONE: (860) 844-5318     FAX:  (860) 844-5325
TOWN OF GRANBY
ENGINEERING DEPARTMENT
SCALE:DATE:JOB #:SHEET:
 1"=100'SEPTEMBER 3, 2026 2025.G01OA-1
OVERALL PLAN
TOWN OF GRANBY
SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING
215 SALMON BROOK STREET
GRANBY, CONNECTICUT
NO.DATEDESCRIPTION
REVISIONS
SHEET C-1 SHEET C-2
SHEET C-3
SHEET C-4
UTILITY WARNING
The locations of existing underground utilities are shown in an approximate way only and have not been independently
verified by the Owner or its representative.  Utilities not shown on this plan may exist. The Contractor shall determine the
exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages
which might be occasioned by the Contractor's failure to exactly locate and preserve any and all underground utilities.
The Contractor shall use CALL BEFORE YOU DIG, 811, https://www.cbyd.com/, prior to any construction activity.

Page 104

100
101
PROP. 5-FT WIDE HMA WALK
SIDEWALK BASE LINE 10
0+0184.96
2+00G.B. 185.41
3+00G.B. 186.08
4+00G.B. 187.17
EXIST. SIDEWALK
PROP. PARK BENCHW/CONC. SLAB
APPROX. GRADING LIMIT
WALKCROSSSLOPE
MATCH
MARK
MATCH
MARK
PROP. CONC.SIDEWALK RAMP5-FT LONG
0+05 END CONC. RAMPEL=185.06
0+50G.B. 184.95
C 9
L 30
L 31
C 10
L 32
C 11
L 33
SF
SF
SF
SF
SF
SF
SF
PROP. SOIL STOCKPILE AREA
SF
SF
SF
SF
SF
SF
SF
C.E.
SEDIMENT & EROSION CONTROL MEASURES
MEASUREPLAN KEY
CONSTRUCTION ENTRANCECE
DUST CONTROLDC
EROSION CONTROL MATTINGECM
GEOTEXTILE SILT FENCEGSF
HAY BALE BARRIERHB
INLET PROTECTIONIP
LAND GRADINGLG
LANDSCAPE MULCHLM
LANDSCAPE PLANTINGLP
MULCH FOR SEEDMS
OUTLET PROTECTIONOP
PERMANENT LINED WATERWAYPW
PERMANENT SEEDINGPS
PERMANENT TURF REINFORCEMENT MAT TRM
RIP RAPRR
SEDIMENT CONTROL LOGSCL
STONE CHECK DAMSCD
STONE SLOPE PROTECTIONSSP
SURFACE ROUGHENINGSR
TOPSOILINGTO
LIST OF ABBREVIATIONS:
BIT. CONC. BITUMINOUS CONCRETE
C.B.CATCH BASIN
CONC.CONCRETE
C.P.E.P.-SCORRUGATED POLYETHYLENE PIPE,
W/SMOOTH INTERIOR
EXIST.EXISTING
G.BGRADE BREAK
INV.     INVERT
L.F.LINEAR FEET
M.H.MANHOLE
PVMT.PAVEMENT
P.V.P.POLYVINYL CHLORIDE
PROP.PROPOSED
TYP.TYPICAL
LEGEND
UTILITY POLE
WETLANDS
BUILDING SETBACK LINE
PROPERTY LINE
PROPOSED
SPOT GRADE
CATCH BASIN
MANHOLE
EASEMENT
CONTOUR
STORM SEWER
CURB
SFSFSFSILT FENCE
PROPOSED
TYPICAL
EXISTING
TYP.PROP.
UPLAND REVIEW AREA
SLSLSEDIMENT CONTROL LOG
SOIL BOUNDARY & TYPE
EXIST. TREE TO BE REMOVED
43B
CONTRACT LIMIT LINE
4+80G.B. 229.4
GRANBY TOWN HALL
15 NORTH GRANBY ROAD
GRANBY, CONNECTICUT 06035
PHONE: (860) 844-5318     FAX:  (860) 844-5325
TOWN OF GRANBY
ENGINEERING DEPARTMENT
SCALE:DATE:JOB #:SHEET:
 1"=20'SEPTEMBER 3, 2026 2025.G01C-1
PLAN
TOWN OF GRANBY
SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING
215 SALMON BROOK STREET
GRANBY, CONNECTICUT
NO.DATEDESCRIPTION
REVISIONS
UTILITY WARNING
The locations of existing underground utilities are shown in an approximate way only and have not been independently
verified by the Owner or its representative.  Utilities not shown on this plan may exist. The Contractor shall determine the
exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages
which might be occasioned by the Contractor's failure to exactly locate and preserve any and all underground utilities.
The Contractor shall use CALL BEFORE YOU DIG, 811, https://www.cbyd.com/, prior to any construction activity.

Page 105

Approximate Edge of Water
Approximate Edge of Water
West Branch Salmon Brook
N/F
TOWN OF GRANBY
215 Salmon Brook Street
Vol. 74 Pg. 176
map H-42 /block 74 /lot 87
DEMO EXIST. TREE (TYP.)
PROP. 5-FT WIDE HMA WALK
SIDEWALK BASE LINE 10
DEMO EXIST. TREE (TYP.)
4+00G.B. 187.17
5+00G.B. 188.19
5+50G.B. 188.15
6+00G.B. 188.59
6+70G.B. 190.28
8+50G.B. 189.71
PROP. PARK BENCHW/CONC. SLAB INLAND WETLANDS REGULATED AREA
APPROX. GRADING LIMIT
WALKCROSSSLOPE
MATCH
MARK
MATCH
MARK
MATCH
MARK
MATCH
MARK
C 11
L 33
C 12
L 34
L 35
C 13
L 36
AREA 1
AREA 2
AREA 3
AREA 5
AREA 4
PROP. WETLANDSMITIGATION AREA (TYP.)
SEDIMENT & EROSION CONTROL MEASURES
MEASUREPLAN KEY
CONSTRUCTION ENTRANCECE
DUST CONTROLDC
EROSION CONTROL MATTINGECM
GEOTEXTILE SILT FENCEGSF
HAY BALE BARRIERHB
INLET PROTECTIONIP
LAND GRADINGLG
LANDSCAPE MULCHLM
LANDSCAPE PLANTINGLP
MULCH FOR SEEDMS
OUTLET PROTECTIONOP
PERMANENT LINED WATERWAYPW
PERMANENT SEEDINGPS
PERMANENT TURF REINFORCEMENT MAT TRM
RIP RAPRR
SEDIMENT CONTROL LOGSCL
STONE CHECK DAMSCD
STONE SLOPE PROTECTIONSSP
SURFACE ROUGHENINGSR
TOPSOILINGTO
LIST OF ABBREVIATIONS:
BIT. CONC. BITUMINOUS CONCRETE
C.B.CATCH BASIN
CONC.CONCRETE
C.P.E.P.-SCORRUGATED POLYETHYLENE PIPE,
W/SMOOTH INTERIOR
EXIST.EXISTING
G.BGRADE BREAK
INV.     INVERT
L.F.LINEAR FEET
M.H.MANHOLE
PVMT.PAVEMENT
P.V.P.POLYVINYL CHLORIDE
PROP.PROPOSED
TYP.TYPICAL
LEGEND
UTILITY POLE
WETLANDS
BUILDING SETBACK LINE
PROPERTY LINE
PROPOSED
SPOT GRADE
CATCH BASIN
MANHOLE
EASEMENT
CONTOUR
STORM SEWER
CURB
SFSFSFSILT FENCE
PROPOSED
TYPICAL
EXISTING
TYP.PROP.
UPLAND REVIEW AREA
SLSLSEDIMENT CONTROL LOG
SOIL BOUNDARY & TYPE
EXIST. TREE TO BE REMOVED
43B
CONTRACT LIMIT LINE
4+80G.B. 229.4
GRANBY TOWN HALL
15 NORTH GRANBY ROAD
GRANBY, CONNECTICUT 06035
PHONE: (860) 844-5318     FAX:  (860) 844-5325
TOWN OF GRANBY
ENGINEERING DEPARTMENT
SCALE:DATE:JOB #:SHEET:
 1"=20'SEPTEMBER 3, 2026 2025.G01C-2
PLAN
TOWN OF GRANBY
SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING
215 SALMON BROOK STREET
GRANBY, CONNECTICUT
NO.DATEDESCRIPTION
REVISIONS
UTILITY WARNING
The locations of existing underground utilities are shown in an approximate way only and have not been independently
verified by the Owner or its representative.  Utilities not shown on this plan may exist. The Contractor shall determine the
exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages
which might be occasioned by the Contractor's failure to exactly locate and preserve any and all underground utilities.
The Contractor shall use CALL BEFORE YOU DIG, 811, https://www.cbyd.com/, prior to any construction activity.

Page 106

N/F
TOWN OF GRANBY
53 West Granby Road
Vol. 94 Pg. 21
map G-42 /block 74 /lot 99
101
Approximate Edge of Water
Approximate Edge of WaterWest Branch Salmon Brook
0+00
1+00
PC: 0+69.48
PT: 0+82.32
PROP. 5-FT WIDE HMA WALK
SIDEWALK BASE LINE 10
L 9
C 8
EXIST. PATH TO BE REBUILT TO 6-FT WIDE WOODS TRAIL
SIDEWALK BASE LINE 11
9+50G.B. 190.30
10+50G.B. 190.30
11+50G.B. 189.67
12+20G.B. 190.41
13+00G.B. 190.57
14+00G.B. 190.33
END 15+14190.91
PROP. PARK BENCHW/CONC. SLAB
APPROX. GRADING LIMIT
WALKCROSSSLOPE
MATCH
MARK
MATCH
MARK
APPROX. LOCATION OFPROP. HORSE PATHCLEAR 5-FT WIDE PATH
MATCH
MARK
MATCH
MARK
C 14
L 37
C 15
L 38
PROP. SOIL STOCKPILE AREA
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
AREA 1
SL
PROP. WETLANDSMITIGATION AREA (TYP.)
SEDIMENT & EROSION CONTROL MEASURES
MEASUREPLAN KEY
CONSTRUCTION ENTRANCECE
DUST CONTROLDC
EROSION CONTROL MATTINGECM
GEOTEXTILE SILT FENCEGSF
HAY BALE BARRIERHB
INLET PROTECTIONIP
LAND GRADINGLG
LANDSCAPE MULCHLM
LANDSCAPE PLANTINGLP
MULCH FOR SEEDMS
OUTLET PROTECTIONOP
PERMANENT LINED WATERWAYPW
PERMANENT SEEDINGPS
PERMANENT TURF REINFORCEMENT MAT TRM
RIP RAPRR
SEDIMENT CONTROL LOGSCL
STONE CHECK DAMSCD
STONE SLOPE PROTECTIONSSP
SURFACE ROUGHENINGSR
TOPSOILINGTO
LIST OF ABBREVIATIONS:
BIT. CONC. BITUMINOUS CONCRETE
C.B.CATCH BASIN
CONC.CONCRETE
C.P.E.P.-SCORRUGATED POLYETHYLENE PIPE,
W/SMOOTH INTERIOR
EXIST.EXISTING
G.BGRADE BREAK
INV.     INVERT
L.F.LINEAR FEET
M.H.MANHOLE
PVMT.PAVEMENT
P.V.P.POLYVINYL CHLORIDE
PROP.PROPOSED
TYP.TYPICAL
LEGEND
UTILITY POLE
WETLANDS
BUILDING SETBACK LINE
PROPERTY LINE
PROPOSED
SPOT GRADE
CATCH BASIN
MANHOLE
EASEMENT
CONTOUR
STORM SEWER
CURB
SFSFSFSILT FENCE
PROPOSED
TYPICAL
EXISTING
TYP.PROP.
UPLAND REVIEW AREA
SLSLSEDIMENT CONTROL LOG
SOIL BOUNDARY & TYPE
EXIST. TREE TO BE REMOVED
43B
CONTRACT LIMIT LINE
4+80G.B. 229.4
GRANBY TOWN HALL
15 NORTH GRANBY ROAD
GRANBY, CONNECTICUT 06035
PHONE: (860) 844-5318     FAX:  (860) 844-5325
TOWN OF GRANBY
ENGINEERING DEPARTMENT
SCALE:DATE:JOB #:SHEET:
 1"=20'SEPTEMBER 3, 2026 2025.G01C-3
PLAN
TOWN OF GRANBY
SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING
215 SALMON BROOK STREET
GRANBY, CONNECTICUT
NO.DATEDESCRIPTION
REVISIONS
UTILITY WARNING
The locations of existing underground utilities are shown in an approximate way only and have not been independently
verified by the Owner or its representative.  Utilities not shown on this plan may exist. The Contractor shall determine the
exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages
which might be occasioned by the Contractor's failure to exactly locate and preserve any and all underground utilities.
The Contractor shall use CALL BEFORE YOU DIG, 811, https://www.cbyd.com/, prior to any construction activity.

Page 107

N/F
TOWN OF GRANBY
53 West Granby Road
Vol. 94 Pg. 21
map G-42 /block 74 /lot 99
Approximate Edge of Water
Approximate Edge of Water
EXISTINGRESIDENCE
West Branch Salmon Brook
(PUBLIC VARIABLE WIDTH)
WEST GRANBY  ROAD  (S.R. #20)
38E
29A
38C
6+31
2+00
3+00
4+00
5+00
6+00
PI: 1+28.88
PI: 1+84.69
PI: 2+10.01
PI: 2+39.46
PI: 2+59.36
PI: 2+79.09
PI: 3+01.49
PI: 3+48.89
PI: 3+99.15
PI: 4+32.03
PI: 4+59.93
PI: 4+81.23
PI: 5+07.56
PI: 5+31.98
PI: 5+69.40
PI: 5+96.97
2+30B.S. 196.29
2+41.70T.S. 203.22
2+69.87B.S. 204.38
2+81.57T.S. 211.31
4+98.50G.B. 229.52
L 10
L 11
L 12
L 13
L 14
L 15
L 17
L 18
L 19
L 20
L 21
L 22
L 23
L 24
L 25
L 26
3+29.74B.S. 213.46
3+36.76T.S. 217.87
394.93B.S. 220.03
3+91.95T.S. 224.44
L 16
1+30G.B. 191.29
PROP. OVERLAPPING TIMBER STEPS7 RISERS, OVERALL LENGTH =12-FT
APPROX. GRADING LIMIT
PROP. OVERLAPPING TIMBER STEPS7 RISERS, OVERALL LENGTH = 12-FT
PROP. OVERLAPPING TIMBER STEPS11 RISERS, OVERALL LENGTH = 16'-8"
PROP. OVERLAPPING TIMBER STEPS11 RISERS, OVERALL LENGTH = 16'-8"
APPROX. LOCATION OFEXIST. HORSE PATH
APPROX. LOCATION OFPROP. HORSE PATHCLEAR 5-FT WIDE PATH
MATCH
MARK
MATCH
MARK
SL
SL
SL
SL
SL
SL
ECM (TYP.)
SL
SEDIMENT & EROSION CONTROL MEASURES
MEASUREPLAN KEY
CONSTRUCTION ENTRANCECE
DUST CONTROLDC
EROSION CONTROL MATTINGECM
GEOTEXTILE SILT FENCEGSF
HAY BALE BARRIERHB
INLET PROTECTIONIP
LAND GRADINGLG
LANDSCAPE MULCHLM
LANDSCAPE PLANTINGLP
MULCH FOR SEEDMS
OUTLET PROTECTIONOP
PERMANENT LINED WATERWAYPW
PERMANENT SEEDINGPS
PERMANENT TURF REINFORCEMENT MAT TRM
RIP RAPRR
SEDIMENT CONTROL LOGSCL
STONE CHECK DAMSCD
STONE SLOPE PROTECTIONSSP
SURFACE ROUGHENINGSR
TOPSOILINGTO
LIST OF ABBREVIATIONS:
BIT. CONC. BITUMINOUS CONCRETE
C.B.CATCH BASIN
CONC.CONCRETE
C.P.E.P.-SCORRUGATED POLYETHYLENE PIPE,
W/SMOOTH INTERIOR
EXIST.EXISTING
G.BGRADE BREAK
INV.     INVERT
L.F.LINEAR FEET
M.H.MANHOLE
PVMT.PAVEMENT
P.V.P.POLYVINYL CHLORIDE
PROP.PROPOSED
TYP.TYPICAL
LEGEND
UTILITY POLE
WETLANDS
BUILDING SETBACK LINE
PROPERTY LINE
PROPOSED
SPOT GRADE
CATCH BASIN
MANHOLE
EASEMENT
CONTOUR
STORM SEWER
CURB
SFSFSFSILT FENCE
PROPOSED
TYPICAL
EXISTING
TYP.PROP.
UPLAND REVIEW AREA
SLSLSEDIMENT CONTROL LOG
SOIL BOUNDARY & TYPE
EXIST. TREE TO BE REMOVED
43B
CONTRACT LIMIT LINE
4+80G.B. 229.4
GRANBY TOWN HALL
15 NORTH GRANBY ROAD
GRANBY, CONNECTICUT 06035
PHONE: (860) 844-5318     FAX:  (860) 844-5325
TOWN OF GRANBY
ENGINEERING DEPARTMENT
SCALE:DATE:JOB #:SHEET:
 1"=20'SEPTEMBER 3, 2026 2025.G01C-4
PLAN
TOWN OF GRANBY
SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING
215 SALMON BROOK STREET
GRANBY, CONNECTICUT
NO.DATEDESCRIPTION
REVISIONS
UTILITY WARNING
The locations of existing underground utilities are shown in an approximate way only and have not been independently
verified by the Owner or its representative.  Utilities not shown on this plan may exist. The Contractor shall determine the
exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages
which might be occasioned by the Contractor's failure to exactly locate and preserve any and all underground utilities.
The Contractor shall use CALL BEFORE YOU DIG, 811, https://www.cbyd.com/, prior to any construction activity.

Page 108

SIDEWALK BASELINE
#10 & PORTION OF #11
@ EDGE OF WALK
DIRECTION OF SLOPE AS
NOTED, 1.5% TYP. 2.0% MAX.
(NOT TO SCALE)
BITUMINOUS CONCRETE SIDEWALK DETAIL
2" HMA S0.375(TRAFFIC LEVEL 1)
8" GRANULAR FILL
COMPACTED IN TWO LIFTS
WIDTH = 5'-0"
3" (TYP.)
COMPACTED SUBGRADE
(NOT TO SCALE)
WOODS TRAIL/STONE DUST PATH DETAIL
3" COMPACTED AASHTO
#10 STONE DUST
4" COMPACTED N0. 4
STONE AGGREGATE
WIDTH = 6'-0"
3" (TYP.)
COMPACTED SUBGRADE
PLAN
AA
B
B
2'-0"
8'-0" 3'-0"
6'-1/8"
5'-0"
11'-0"
ATTACH BENCH TO SLAB
W/ 4 - 3/8" x 3-1/2" CONCRETE
EXPANSION ANCHOR BOLTS
1'-0"
2'-0"
SECTION B-B
BENCH
NOTES:
1. BENCH TO BE A EVEREST SERIES 8-FT. PARK BENCH
WITH BACK - SURFACE MOUNT MODEL 595-6002 AS
MANUFACTURED BY HIGHLAND PRODUCTS GROUP/THE
PARK CATALOG, 931 VILLAGE BLVD STE 905-354, WEST
PALM BEACH, FL 33409, OR EQUIVALENT
2. SLAB TO BE CONSTRUCTED AS A CONC. WALK
CONFORMING TO FORM 818.
BENCH
EDGE OF SIDEWALK
MATCH GRADE
BIT. SIDEWALK
(NOT TO SCALE)
PARK BENCH W/CONCRETE SLAB
SECTION A-A
SLOPE = 1.5%
1
2" EXPANSION JOINT WITH
PRE-MOLDED
EXPANSION JOINT MATERIAL
5
8" x 12" LONG SMOOTH,
STEEL DOWEL
1' O/C - FREE AT ONE END
CLASS "C" CONCRETE SURFACE
FINISHED WITH A WOOD FLOAT
OR BY OTHER APPROVED
MEANS
1
2" EXPANSION JOINT WITH
PRE-MOLDED
EXPANSION JOINT MATERIAL
CONC. SLAB
5"
8"
AFTER
COMPACTION
GRANULAR FILL PLACED IN TWO
COURSES.
COMPACTED SUBGRADE
1
2" EXPANSION JOINT WITH
PRE-MOLDED EXPANSION
JOINT MATERIAL
EXPANSION JOINT
PLAN
EDGE OF
PAVEMENT
SIDEWALK
4"
6"
COMPACTED SUBGRADE
GRANULAR FILL PLACED IN TWO
COURSES.
6" x 6" #10 W.W.M.
A A
2' DETECTABLE
WARNING
SIDEWALK
WIDTH AS NOTED
(5' MIN.)
SLOPE ADJACENT LAWN/LANDSCAPED
AREA AS NECESSARY TO MEET THE
EDGE OF THE RAMP
CONCRETE RAMP
SLOPE DOWN TO PAVEMENT.  RAMP SLOPE
TO BE 2.0%.  RAMP SURFACE TO
BE BROOM FINISH PERPENDICULAR TO
DIRECTION OF TRAVEL.
5'-0"
EXIST. ROAD PAVEMENT
CLASS 'F' CONCRETE
SLOPE
1/4" PER FOOT
ELEVATION AT GUTTER
SHALL BE FLUSH WITH
ROADWAY PAVEMENT
2' DETECTABLE
WARNING
SECTION A-A
CONCRETE WALK RAMP DETAIL - W/NO EXIST. CURB AT PAVEMENT
(NOT TO SCALE)
OVERLAPPING TIMBER STEP DETAIL
ADDITIONAL NOTES:
1. TIMBER TO BE 8" X 8", #2 GROUND CONTACT ROUGH SAWN PRESSURE
TREATED LUMBER.
2. RISERS TO BE 7-1/2".  TREADS TO BE 14"
3. TIMBERS TO BE SET ON A 4-INCH COMPACTED STONE (CTDOT NO. 4)
BASE.
4. TREAD INFILL BETWEEN THE RISERS TO BE AASHTO #10 STONE DUST.
NO.DATEDESCRIPTION
REVISIONS
8/16/24   PER CTDOT COMMENTSGRANBY TOWN HALL
15 NORTH GRANBY ROAD
GRANBY, CONNECTICUT 06035
PHONE: (860) 844-5318     FAX:  (860) 844-5325
TOWN OF GRANBY
ENGINEERING DEPARTMENT
SCALE:DATE:JOB #:SHEET:
 1"=20'SEPTEMBER 3, 2026 2025.G01DE-1
DETAILS & NOTES
TOWN OF GRANBY
SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING
215 SALMON BROOK STREET
GRANBY, CONNECTICUT

Page 109

(NOT TO SCALE)
SILT FENCE DETAIL (GSF)
SLOPE
6"x6" TRENCH.
REPLACE AND COMPACT
WITH EXCAVATED
MATERIAL
12"
(MIN.)
30"
(MIN.)
PREFABRICATED SEDIMENT
FENCE.  U.S. SILT & SITE
SUPPLY/GETSCO
CT36112130 OR EQUIVALENT
(NOT TO SCALE)
SEDIMENT LOG DETAIL (ON BARE SOIL)DOWN SLOPE
NOTES:
1. CURLEX SEDIMENT LOGS AS MANUFACTURED BY AMERICAN
EXCELSIOR COMPANY.  SEDIMENT LOG SIZE TO BE 9-INCHES
UNLESS OTHERWISE NOTED ON THE PLANS.
2. TRENCH OPTION IS MOST APPLICABLE IN LOOSE,
UNCONSOLIDATED SOILS.
3. STAKE SIZE:
1 1 8" X 1 1 8" X 30" WOODEN STAKES ARE RECOMMENDED FOR
6", 9", AND 12" SEDIMENT LOGS.
1 1 8" X 1 1 8" X 48" WOODEN STAKES ARE RECOMMENDED FOR
20" SEDIMENT LOGS.
4. INSTALLATION TO BE AS PER THE MANUFACTURERS
INSTRUCTIONS.
16"
(MIN.)
CURLEX ®SEDIMENT LOGS
WOOD STAKE
WOOD STAKE TO ONLY
PENETRATE NETTING,
NOT CURLEX ®MATERIAL
SLOPE
SURFACE
PLANTING DETAIL
NOTE:
PRUNE LOWER BRANCHES OF TREE BACK
TO MAIN TRUNK SO THAT REMAINING
HEAD IS APPROX. 1/2 OF TOTAL TREE
HEIGHT
2xBALL
RADIUS
1'± MULCH EDGE
STAKING AND PLANTING TREE
WRAP TRUNK OF TREE WITH
STANDARD TREE WRAPPING PAPER
(CRAPE) STARTING FROM BOTTOM
WINDING UPWARDS
UNTIE BALLING STRING FROM BASE OF TRUNK
ALLOW THIN LAYER OF SOIL TO COVER BALL
DEPRESSION FOR WATER ACCUMULATION
BERM SIZE TO BE PROMINENT COMPACT
OUTER EDGE WITH FOOTPRINT
GROUND TREATED STAKES
(3 STAKES SPACED EQUIDISTANT)
PEEL BACK BURLAP
BACKFILL WITH 4 PARTS
TOPSOIL, 1 PART PEAT & 1
PART MANURE
RUBBER HOSE AT
CONTACT POINTS
6" (MIN.)
(NOT TO SCALE)
CONSTRUCTION ENTRANCE DETAIL (CE)
LENGTH = AS SHOWN ON PLAN (MIN.=30')
WIDTH = AS SHOWN ON PLAN (MIN. =12')
REMOVE TOPSOIL & ORGANICS
PRIOR TO PLACING GEOTEXTILE
& STONE
CONNDOT N0. 3
CRUSHED GRAVEL
GEOTEXTILE
PAVED ROAD
OR DRIVE
NO.DATEDESCRIPTION
REVISIONS
GRANBY TOWN HALL
15 NORTH GRANBY ROAD
GRANBY, CONNECTICUT 06035
PHONE: (860) 844-5318     FAX:  (860) 844-5325
TOWN OF GRANBY
ENGINEERING DEPARTMENT
SCALE:DATE:JOB #:SHEET:
 1"=20'SEPTEMBER 3, 2026 2025.G01DE-2
DETAILS & NOTES
TOWN OF GRANBY
SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING
215 SALMON BROOK STREET
GRANBY, CONNECTICUT

Page 110

GENERAL EROSION AND SEDIMENT CONTROL NOTES:
1. EROSION AND SEDIMENT CONTROL MEASURES SHALL CONFORM TO, "CONNECTICUT GUIDELINES FOR SOIL EROSION AND
SEDIMENT CONTROL, THE COUNCIL ON SOIL AND WATER CONSERVATION, ADOPTED MARCH 30, 2024," AS AMENDED.
2. THE SEDIMENT AND EROSION CONTROL NOTES AND DETAILS INCLUDED IN THE CONSTRUCTION DOCUMENTS MAY REFER TO
INFORMATION LOCATED IN THE GUIDELINES.  THE CONTRACTOR SHALL HAVE A COPY OF THE GUIDELINES AVAILABLE FOR
REFERENCE DURING CONSTRUCTION.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION, MAINTENANCE, AND REMOVAL OF ALL SEDIMENTATION AND
EROSION CONTROL MEASURES.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING THE NEARBY STREETS OF ANY SEDIMENT OR CONSTRUCTION
DEBRIS ORIGINATING FROM THIS PROJECT.
5. IF EXCESS MATERIAL FROM THE PROPOSED CONSTRUCTION IS TO BE REMOVED FROM THE SITE, THE CONTRACTOR SHALL
OBTAIN ALL NECESSARY PERMITS FOR  ITS DEPOSITION.
6. THE CONSTRUCTION ENTRANCE, IF NOTED,  AND THE SEDIMENT CONTROLS LOCATED AT THE PERIMETER OF THE PROPOSED
EDGE OF DISTURBANCE(S), SHALL BE INSTALLED PRIOR TO ANY CONSTRUCTION ACTIVITY.  INSTALLATION SHALL BE AS PER THE
MANUFACTURERS' INSTRUCTIONS AND AS DETAILED ON THESE PLANS.
7. ALL STORM DRAINAGE INLETS ARE TO BE PROTECTED FROM SEDIMENT INTRUSION.  SEDIMENT SHALL BE REMOVED FROM ALL
DRAINAGE  STRUCTURES, PIPE SYSTEMS, OUTLET STRUCTURES, RIP RAP, AND CHANNELS.
8. ALL STOCKPILES OF SOIL ARE TO BE ENCIRCLED WITH SILT FENCE.
9. THE CONTRACTOR SHALL EMPLOY TEMPORARY EROSION CONTROL MEASURES SUCH AS, SILT FENCE, HAY BALES, STONE
BARRIERS, EROSION CONTROL MATTING, SEDIMENT TRAPS, DEWATERING BASINS, AND TEMPORARY STORMWATER DIVERSIONS,
AS NECESSARY DURING CONSTRUCTION, TO PROTECT THE SITE AND ADJACENT PROPERTIES FROM EROSION.
10. ALL LOCATIONS, INCLUDING SWALES, LAWN AREAS, AND STORM SEWER DISCHARGE POINTS, THAT ARE TO RECEIVE A
CONCENTRATED FLOW OF STORMWATER, ORIGINATING FROM SURFACE FLOW OR STORM SEWER SYSTEMS, SHALL BE
STABILIZED AND PROTECTED FROM EROSION PRIOR TO RECEIVING THE WATER.
11. DAMAGED  SECTIONS OF SEDIMENT BARRIERS SHALL BE REPLACED BY THE CONTRACTOR.  SEDIMENT DEPOSITS SHALL BE
REMOVED BY THE CONTRACTOR WHEN THEY REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIER.  SEDIMENT
SHALL BE REMOVED IN A MANNER THAT DOES NOT CAUSE ADDITIONAL EROSION OR POLLUTION.
12. AT A MINIMUM, ALL SEDIMENT CONTROL MEASURES SHALL BE INSPECTED BY THE CONTRACTOR AT LEAST ONCE A WEEK AND
WITHIN 24 HOURS OF THE END OF A STORM WITH A RAINFALL AMOUNT OF 0.5 INCHES OR GREATER.   REPAIR SEDIMENT
CONTROL MEASURE AS NECESSARY.
13. DISTURBED AREAS ARE TO BE STABILIZED AS SOON AS POSSIBLE AFTER DISTURBANCE.  WHEN GRADING OF THE DISTURBED
AREA WILL BE SUSPENDED FOR A PERIOD OF 30 OR MORE CONSECUTIVE DAYS, BUT LESS THAN 5 MONTHS, STABILIZE THE SITE
WITHIN 7 DAYS OF THE SUSPENSION OF GRADING THROUGH THE USE OF MULCH OR OTHER MATERIALS APPROPRIATE FOR USE
AS A TEMPORARY SOIL PROTECTOR.  FOR SURFACES THAT ARE NOT TO BE REWORKED WITHIN 5 MONTHS BUT WILL BE
REWORKED WITHIN 1 YEAR, USE TEMPORARY SEEDING, MULCH FOR SEED OR WHEN SLOPES ARE LESS THAN 3:1, WOOD CHIPS,
BARK CHIPS OR SHREDDED BARK.  FOR SURFACES THAT ARE TO BE REWORKED AFTER 1 YEAR, USE PERMANENT SEEDING AND
MULCH FOR SEED.
14. EXCAVATED STUMPS AND CUT TREES ARE TO BE CHIPPED AND STOCKPILED FOR FUTURE USE, OR REMOVED TO AN OFF-SITE
DISPOSAL AREA.   BRUSH AND SLASH ARE TO BE CHIPPED AND STOCKPILE FOR FUTURE USE OR REMOVED FROM THE SITE.
EXCAVATED STUMPS, CUT TREES, BRUSH, AND SLASH, ARE NOT TO BE BURIED ON-SITE.
LAND GRADING (LG)
DESIGN CRITERIA
SLOPE DEFINED
SLOPE IS THE RELATIONSHIP OF HORIZONTAL DISTANCE TO VERTICAL DISTANCE AND IS REFERENCED AS EITHER
HORIZONTAL TO VERTICAL, A RATIO OF HORIZONTAL:VERTICAL OR A PERCENTAGE OF THE VERTICAL DIVIDED BY THE
HORIZONTAL.
SLOPE GRADIENT LIMITATIONS
VEGETATED MOWED SLOPES:  WHERE A SLOPE IS TO BE VEGETATED AND MOWED, THE SLOPE SHALL NOT BE
STEEPER THAN 3:1; FLATTER SLOPES ARE PREFERRED BECAUSE OF SAFETY FACTORS RELATED TO THE
OPERATION OF EQUIPMENT.
VEGETATED UNMOWED SLOPES:  WHERE A SLOPE IS TO BE VEGETATED BUT NOT MOWED, THE SLOPE SHALL
NOT BE STEEPER THAN 2:1.
STRUCTURALLY STABILIZED SLOPES:  FOR SLOPES STEEPER THAN 2: 1OR WHEN SLOPES ARE STEEPER THAN 3:
1 AND THE CHANGE IN ELEVATION EXCEEDS 15 FEET WITHOUT A CROSS SLOPE BENCH, ENGINEERED
STRUCTURAL DESIGN FEATURES SHALL BE INCORPORATED. APPLICABLE ENGINEERED MEASURES MAY INCLUDE
THOSE FOUND IN THE STABILIZATION STRUCTURES FUNCTIONAL GROUP (SEE FIGURE 3-4, SELECTION MATRIX)
OR OTHER STRUCTURAL MEASURES DESIGNED BY THE ENGINEER,
EXCEPTIONS:  SLOPE LIMITATIONS MAY BE INCREASED PROVIDING DETAILED SOIL MECHANICS ANALYSIS
CALCULATIONS ARE PERFORMED WHICH CONFIRM AN ACCEPTABLE SAFETY FACTOR FOR THE FINISHED SLOPE.
SLOPE LENGTH LIMITATIONS AND REVERSE SLOPE BENCHES
REVERSE SLOPE BENCHES ARE REQUIRED WHENEVER THE VERTICAL HEIGHT OF ANY SLOPE STEEPER THAN 3:1
EXCEEDS 15 FEET, EXCEPT WHEN ENGINEERED SLOPE STABILIZATION STRUCTURES MEASURES ARE INCLUDED IN THE
SLOPE AND/OR A DETAILED SOIL MECHANICS ANALYSIS CALCULATION HAS CONFIRMED AN ACCEPTABLE FACTOR OF
SAFETY EXISTS FOR THE FINISHED SLOPE.
CONTROLLING WATER MOVEMENT
MAKE PROVISIONS TO SAFELY CONDUCT SURFACE RUNOFF TO STORM DRAINS, PROTECTED OUTLETS OR TO STABLE
WATERCOURSES TO ENSURE THAT RUNOFF WILL NOT DAMAGE SLOPES OR OTHER GRADED AREAS.
SURFACE WATER:
MAXIMUM ALLOWABLE OVERLAND FLOW DISTANCE IN FEET TO THE TOP OF THE DESIGNED SLOPE WITH NO
DIVERSION OF SURFACE WATER IS DETERMINED BY USE OF THE FORMULA:
A=X (15-Y)
A = MAXIMUM OVERLAND FLOW DISTANCE IN FEET ABOVE THE CREST OF THE DESIGNED SLOPE
B = MAXIMUM HORIZONTAL DISTANCE IN FEET SHALL NOT EXCEED 15X.
X = SIDE SLOPE; HORIZONTAL DISTANCE IN FEET TO ONE FOOT VERTICAL (E.G., = 2 FOR DESIGNED
SLOPE 2:1)
Y = HEIGHT OF DESIGNED SLOPE IN FEET MEASURED VERTICALLY FROM TOE ELEVATION OF THE
DESIGNED SLOPE TO TOP OF CUT OR FILL FOR THE DESIGNED SLOPE.
EITHER DIVERT SURFACE WATER FROM THE FACE OF ALL CUT AND FILL SLOPES BY THE USE OF DIVERSIONS,
DITCHES AND DRAINAGE WAYS OR OTHERWISE CONVEY IT DOWN THE SLOPE BY THE USE OF OTHER
APPROPRIATE MEASURES. SURFACE WATER MAY BE ALLOWED TO FLOW DOWN CUT AND FILL SLOPES WHEN ALL
OF THE FOLLOWING CONDITIONS EXIST:
·THE LENGTH OF OVERLAND FLOW (IN FEET) TO THE CREST OF THE DESIGNED SLOPE DOES NOT EXCEED
THE DISTANCE "A";
·THE FACE OF THE SLOPE IS ALREADY STABLE OR THE FACE OF THE SLOPE IS PROTECTED FROM SURFACE
RUNOFF UNTIL IT IS STABILIZED;
·THE FACE OF THE SLOPE IS NOT SUBJECTED TO ANY CONCENTRATED FLOWS OF SURFACE WATER FROM
NATURAL DRAINAGE WAYS AND STRUCTURES SUCH AS GRADED DRAINAGE WAYS AND DOWNSPOUTS; AND
·THE MAXIMUM TOTAL HORIZONTAL OVERLAND FLOW (A) PLUS SLOPE DISTANCE (B) DOES NOT EXCEED 15
TIMES THE SIDE SLOPE (X) OF THE CUT OR FILL SLOPES.
SUBSURFACE WATER:
SUBSURFACE DRAINAGE SHALL BE PROVIDED WHERE NECESSARY TO INTERCEPT GROUNDWATER SEEPAGE
THAT WOULD OTHERWISE ADVERSELY AFFECT SLOPE STABILITY OR CREATE EXCESSIVELY WET SITE
CONDITIONS THAT WOULD HINDER OR PROHIBIT DESIRED VEGETATIVE GROWTH.
OTHER DESIGN LIMITATIONS
SLOPES SHALL NOT BE CREATED CLOSE TO PROPERTY LINES SO AS TO ENDANGER ADJOINING PROPERTIES WITHOUT
ADEQUATELY PROTECTING SUCH PROPERTIES AGAINST EROSION, SEDIMENTATION, SLIPPAGE, SETTLEMENT,
SUBSIDENCE OR OTHER RELATED DAMAGE.
SOIL MATERIAL USED FOR EARTH FILL SHALL BE OBTAINED FROM AN APPROVED BORROW PIT OR OTHER DESIGNATED
AREA.  THE FILL MATERIAL SHALL BE FREE OF BRUSH, RUBBISH, LARGE ROCKS, LOGS, STUMPS, BUILDING DEBRIS, AND
OTHER OBJECTIONABLE MATERIAL THAT WOULD INTERFERE WITH, OR PREVENT CONSTRUCTION OF, SATISFACTORY
FILLS. IT SHOULD BE FREE OF STONES OVER 2 INCHES IN DIAMETER WHERE COMPACTED BY HAND OR MECHANICAL
TAMPERS OR OVER 6 INCHES IN DIAMETER WHERE COMPACTED BY ROLLERS OR OTHER EQUIPMENT.  FROZEN
MATERIAL SHALL NOT BE PLACED IN THE FILL NOR SHALL THE FILL MATERIAL BE PLACED ON A FROZEN FOUNDATION.
STOCKPILES, BORROW AREAS AND SPOIL AREAS SHALL BE LOCATED AWAY FROM STEEP SLOPES AND SURFACE
WATERS AND SHALL BE SHOWN ON THE PLANS.  SOIL STOCKPILES SHALL BE SUBJECT TO THE PROVISIONS OF THIS
MEASURE.
ALL DISTURBED AREAS SHALL BE STABILIZED IN ACCORDANCE WITH THE E&S MEASURES CONTAINED IN THESE
GUIDELINES.
INSTALLATION REQUIREMENTS
1. PROTECT ALL GRADED OR DISTURBED AREAS INCLUDING SLOPES DURING CLEARING AND CONSTRUCTION IN
ACCORDANCE WITH THE APPROVED EROSION AND. SEDIMENT CONTROL PLAN UNTIL THEY ARE PERMANENTLY
STABILIZED.
2. CONSTRUCT AND MAINTAIN ALL EROSION AND SEDIMENT CONTROLS IN ACCORDANCE WITH THE APPROVED
EROSION AND SEDIMENT CONTROL PLAN.
3. CLEAR AND GRUB AREA TO BE GRADED. IN FILLED AREAS WHERE FILL EXCEEDS 5 FEET IN DEPTH, GRUBBING
MAY NOT BE REQUIRED.
4. STRIP AND STOCKPILE TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION IN AMOUNTS NECESSARY
TO COMPLETE FINISHED GRADING OF ALL EXPOSED AREAS.
5. USE ONLY FILL MATERIALS THAT ARE FREE OF BRUSH, RUBBISH, ROCKS, LOGS, STUMPS, BUILDING DEBRIS AND
OTHER OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR PREVENT CONSTRUCTION OF
SATISFACTORY FILLS. FROZEN MATERIAL OR SOFT, SATURATED OR HIGHLY COMPRESSIBLE MATERIALS SHALL
NOT BE INCORPORATED INTO FILLS. ROCK FILL AND OTHER CLEAN FILL! MAY BE USED PROVIDING IT DOES NOT
INTERFERE WITH THE CONSTRUCTION OF STRUCTURES.
6. PLACE AND COMPACT ALL FILL IN LAYERS NOT EXCEEDING 1 FOOT IN THICKNESS. NO EMBANKMENT LAYER
SHALL BE DEPOSITED ON SURFACES OF SNOW OR ICE NOR SHALL IT BE PLACED ON FROZEN OR UNSTABLE
SURFACES.  WHERE EMBANKMENTS ARE TO BE CONSTRUCTED ON SLOPES STEEPER THAN 3:1, DEEPLY SCARIFY
THE EXISTING SLOPE OR CUT INTO STEPS BEFORE FILLING IS BEGUN. IF FILL PLACEMENT IS NOT COMPLETED
WITHIN 1 DAY, THEN INSTALL TEMPORARY EROSION AND SEDIMENT CONTROLS, SUCH AS TEMPORARY FILL BERM,
AS NECESSARY TO REDIRECT RUNOFF WATER AWAY FROM THE UNSTABLE SLOPE UNTIL FILL PLACEMENT
RESUMES.
7 COMPACT ALL FILLS AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER
RELATED PROBLEMS. FILL THAT IS INTENDED TO SUPPORT BUILDINGS, STRUCTURES, CONDUITS AND OTHER
FACILITIES SHALL BE COMPACTED IN ACCORDANCE WITH THE DESIGN SPECIFICATIONS.
8. PRIOR TO FINAL SEEDING, ROUGHEN SLOPES 2:1 THROUGH 5:1 TO REDUCE RUNOFF VELOCITIES UNLESS THE
ENGINEER DIRECTS OTHERWISE.
9. IF AREAS ARE TO BE TOPSOILED, REFER TO THE TOPSOILING MEASURE (TO).
10. DURING ALL PHASES OF CONSTRUCTION KEEP REVERSE SLOPE BENCHES FREE OF SEDIMENT.
11. THE TREATMENT OF SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE REVIEWED AND
ADDRESSED BY THE ENGINEER IN ACCORDANCE WITH GENERALLY ACCEPTED ENGINEERING STANDARDS.
12. APPLY PERMANENT SOIL STABILIZATION MEASURES TO ALL GRADED AREAS WITHIN 7 DAYS OF ESTABLISHING
FINAL GRADE.  IF FINAL GRADING IS TO BE DELAYED FOR MORE THAN 30 DAYS AFTER LAND DISTURBANCE
ACTIVITIES CEASE, TEMPORARY SOIL STABILIZATION MEASURES (TSP) SHALL BE APPLIED IN ACCORDANCE WITH
THE TEMPORARY SEEDING (TS) MEASURE.
MAINTENANCE:
INSPECT AND MAINTAIN ALL EROSION AND SEDIMENT MEASURES IMPLEMENTED DURING LAND GRADING
OPERATIONS ACCORDING TO THEIR RESPECTIVE REQUIREMENTS.
TOPSOILING (TO), TEMPORARY (TS) AND PERMANENT SEEDING (PS):
1. TOPSOILING, TEMPORARY AND PERMANENT SEEDING, AND MULCHING MEASURES SHALL CONFORM TO, "2002,
CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL, THE CONNECTICUT COUNCIL ON SOIL
AND WATER CONSERVATION," AS AMENDED.
2. PROVISIONS SHALL BE MADE FOR SURFACE AND SUBSURFACE DRAINAGE, AS NEEDED, AND FOR THE DISPOSAL
OF RUNOFF WITHOUT CAUSING EROSION.
3. TOPSOIL SHALL INCLUSIVELY MEAN A SOIL:
·MEETING ONE OF THE FOLLOWING SOIL TEXTURAL CLASSES ESTABLISHED BY THE UNITED STATES
DEPARTMENT OF AGRICULTURE CLASSIFICATION SYSTEM BASED UPON THE PROPORTION SAND, SILT, AND
CLAY SIZE PARTICLES AFTER PASSING A 2 MILLIMETER (MM) SIEVE AND SUBJECTED TO A PARTICLE SIZE
ANALYSIS:
LOAMY SAND, INCLUDING COARSE, LOAMY FINE, AND LOAMY VERY FINE SAND,
LOAMY SAND, INCLUDING COARSE, LOAMY FINE, AND LOAMY VERY FINE SAND,
SANDY LOAM, INCLUDING COARSE, FINE AND VERY FINE SANDY LOAM,
LOAM, OR SILT LOAM WITH NOT MORE THAN 60% SILT;
·CONTAINING NOT LESS THAN 6% AND NOT MORE THAN 20% ORGANIC MATTER AS DETERMINED BY
LOSS-ON-IGNITION OF OVEN DRIED SAMPLES DRIED AT 105 DEGREES CENTIGRADE;
·POSSESSING A PH RANGE 6.0-7.5, EXCEPT IF THE VEGETATIVE PRACTICE BEING USED SPECIFICALLY
REQUIRES A LOWER PH, THEN PH MAY BE ADJUSTED ACCORDING;
·HAVING SOLUBLE SALTS NOT EXCEEDING 500 PPM; AND
·THAT IS LOOSE AND FRIABLE AND FREE FROM REFUSE, STUMPS, ROOTS, BRUSH, WEEDS, FROZEN
PARTICLES, ROCKS, AND STONES OVER 1.25 INCHES IN DIAMETER; AND ANY MATERIAL THAT WILL PREVENT
THE FORMATION OF A SUITABLE SEEDBED OR PREVENT SEED GERMINATION AND PLANT GROWTH.
TOPSOIL MAY BE OF NATURAL ORIGIN OR MANUFACTURED BY BLENDING COMPOSTED ORGANIC MATERIALS WITH
ORGANIC DEFICIENT SOILS, MINERAL SOILS, SAND AND LIME SUCH THAT THE RESULTING SOIL MEETS THE
MATERIAL SPECIFICATIONS LISTED ABOVE.  ALL TOPSOIL SHALL BE ANALYZED BY A RECOGNIZED SOIL TESTING
LABORATORY FOR ORGANIC CONTENT, PH AND SOLUBLE SALTS REQUIREMENTS GIVEN ABOVE.
4. PRIOR TO PLACING THE TOPSOIL, LOOSEN THE SUBGRADE BY DISCING OR SCARIFYING THE SURFACE TO A
DEPTH OF TWO (2) INCHES.  TOPSOIL SHALL BE APPLIED TO AT LEAST A MINIMUM COMPACTED DEPTH OF FOUR
INCHES.  COMPACTING IS TO INSURE A GOOD BOND WITH THE SUBGRADE AND TO OBTAIN A UNIFORM SEED BED.
DO NOT OVER COMPACT.  DO NOT APPLY TOPSOIL WHEN IN A FROZEN OR MUDDY CONDITION, OR WHEN THE
SUBGRADE IS EXCESSIVELY WET.
5. SEEDBED PREPARATION:
a. APPLY LIMESTONE AND FERTILIZER ACCORDING TO SOIL TESTS.  IF SOIL TESTING IS NOT FEASIBLE, OR
WHERE TIMING IS CRITICAL, FERTILIZER MAY BE APPLIED AT THE RATE OF 300 POUNDS PER ACRE USING
10-10-10 OR EQUIVALENT.  IN ADDITION, 300 POUNDS OF 38-0-0 OR EQUIVALENT OF SLOW RELEASE
NITROGEN MAY BE USED FOR TOP DRESSING.  APPLY GROUND LIMESTONE AT THE RATE OF THREE (3)
TONS PER ACRE.
b. WORK LIME AND FERTILIZER INTO THE SOIL AS NEARLY AS PRACTICAL TO A DEPTH OF FOUR (4) INCHES
WITH A DISK, SPRING TOOTH HARROW OR OTHER SUITABLE EQUIPMENT.  THE FINAL HARROWING OR
DISCING OPERATION SHOULD BE ON THE GENERAL CONTOUR.  CONTINUE TILLAGE UNTIL A REASONABLY
UNIFORM, FINE SEEDBED IS PREPARED.  ALL BUT CLAY OR SILTY SOILS AND COARSE SANDS SHOULD BE
ROLLED TO FIRM THE SEEDBED WHERE FEASIBLE.
c. REMOVE FROM THE SURFACE ALL STONES TWO (2) INCHES OR LARGER IN ANY DIMENSION.  REMOVE ALL
OTHER DEBRIS SUCH AS WIRE, CABLE, TREE ROOTS, PIECES OF CONCRETE, CLODS, LUMPS, OR OTHER
UNSUITABLE MATERIAL.
7. RECOMMENDED SEEDING DATES:
PERMANENT: APRIL 15 THROUGH JUNE 15
AUGUST 15 THROUGH SEPTEMBER 15
TEMPORARY: MARCH 1 TO JUNE 15
AUGUST 1 TO OCTOBER 1
8. RECOMMENDED SEED MIXTURES:
THE SEED MIXTURE SHALL BE ONE RECOMMENDED BY THE NATIONAL RESOURCES CONSERVATION SERVICE OR
THE FOLLOWING:
APPLICATIONSEED MIXTURELBS./1000 SQ. FT.
LAWNSKENTUCKY BLUEGRASS1.8
CREEPING RED FESCUE1.8
PERENNIAL RYE GRASS0.4
ROADSIDES OR SLOPESCREEPING RED FESCUE1.9
REDTOP0.2
TALL FESCUE OR SMOOTH BROMEGRASS1.9
SLOPES (NO MOWING)CREEPING RED FESCUE2.1
REDTOP0.2
CROWN VETCH WITH INOCULANT1.7
OR FLAT PEA WITH INOCULANT(3.5)
TEMPORARYWINTER RYE3.0
OR ANNUAL RYEGRASS3.0
9. SEEDING:
a. APPLY SEED UNIFORMLY BY HAND, CYCLONE SEEDER, DRILL, CULTIPACKER TYPE SEEDER OR
HYDROSEEDER (SLURRY INCLUDING SEED AND FERTILIZER).  NORMAL SEEDING DEPTH IS FROM 1/4 TO 1/2
INCH.  HYDROSEEDINGS WHICH ARE MULCHED MAY BE LEFT ON SOIL SURFACE.
b. WHERE FEASIBLE, EXCEPT WHERE EITHER A CULTIPACKER TYPE SEEDER OR HYDROSEEDER IS USED, THE
SEEDBED SHOULD BE FIRMED FOLLOWING SEEDING OPERATIONS WITH A ROLLER, OR LIGHT DRAG.
SEEDING OPERATIONS SHOULD BE ON THE CONTOUR.
c. IF SEEDING CANNOT BE DONE WITHIN THE SEEDING DATES, USE TEMPORARY MULCHING WITH AN
APPLICATION RATE OF 2.5 TO 3 TONS/ACRE TO PROTECT THE SITE AND DELAY SEEDING UNTIL THE NEXT
RECOMMENDED SEEDING PERIOD.
10. STABILIZING APPLIED TOPSOIL: IMMEDIATELY FOLLOWING TOPSOIL APPLICATIONS, PROTECT THE TOPSOIL FROM
EROSION BY EITHER SODDING, SEEDING AND/OR MULCHING.  ADDITIONAL STABILIZATION MEASURES MAY BE
REQUIRED.
GENERAL NOTES:
1. THE CONTRACTOR SHALL USE "CALL BEFORE YOU DIG, 1-800-922-4455" PRIOR TO ANY CONSTRUCTION ACTIVITY.
2. CONSTRUCTION METHODS AND MATERIALS, SHALL CONFORM TO THE REGULATIONS OF  CONNDOT FORM 818.AS AMENDED.
3. THE CONTRACTOR SHALL VERIFY ALL LINES AND GRADES PRIOR TO ANY CONSTRUCTION. ANY DISCREPANCIES SHALL BE
BROUGHT TO THE ATTENTION OF THE ENGINEER.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND INCURRING THE COST OF ALL REQUIRED PERMITS,
INSPECTIONS, CERTIFICATES, ETC.
5. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR JOBSITE SAFETY AND SHALL COMPLY WITH ALL FEDERAL AND STATE
OCCUPATIONAL SAFETY AND HEALTH AUTHORITY (O.S.H.A.) REGULATIONS.
6. THE CONTRACTOR SHALL PROVIDE, INSTALL, MAINTAIN AND REMOVE ALL SHORING, BRACING AND OTHER ITEMS NECESSARY
TO RETAIN BANKS OR EXCAVATIONS AND PREVENT CAVE-INS AND DISPLACEMENT OF ADJOINING GROUND.  SHORING AND
BRACING SHALL BE ENTIRELY INDEPENDENT OF FOOTINGS.
7. THE CONTRACTOR SHALL KEEP TRENCHES FREE FROM STANDING WATER AT ALL TIMES UNTIL PERMANENT WORK IS IN
PLACE.  ALL NECESSARY WELL-POINTING AND/OR PUMPING SHALL BE PERFORMED AND MAINTAINED AT THE CONTRACTOR'S
EXPENSE.
6. ALL EXPOSED CURB ENDS ARE TO BE TAPERED.
7. SAW CUT EXISTING CURBS AND PAVEMENT WHERE THEY MEET PROPOSED CURBS OR PAVEMENT.
MULCH FOR SEED (MS)
APPLICABILITY:  USED WITH TEMPORARY SEEDING AND PERMANENT SEEDING MEASURES.
MATERIALS
MULCH FOR SEED, INCLUDING TACKIFIERS AND NETTINGS USED TO ANCHOR MUCH, SHALL BE:
·BIODEGRADABLE OR PHOTO-DEGRADABLE WITHIN 2 YEARS HUT WITHOUT SUBSTANTIAL DEGRADATION
OVER A PERIOD OF 6 WEEKS,
·FREE OF CONTAMINANTS THAT POLLUTE THE AIR OR WATERS OF THE STATE WHEN PROPERLY APPLIED,
·FREE OF FOREIGN MATERIAL, COARSE STEMS AND ANY SUBSTANCE TOXIC TO PLANT GROWTH OR WHICH
INTERFERES WITH SEED GERMINATION, AND
·CAPABLE OF BEING APPLIED EVENLY SUCH THAT IT PROVIDES 80%-95% SOIL COVERAGE AND STILL
ADHERES TO THE SOIL SURFACE, DOES NOT SLIP ON SLOPES WHEN IT RAINS OR IS WATERED, DOES NOT
BLOW OF SITE, DISSIPATES RAINDROP SPLASH, HOLDS SOIL MOISTURE, MODERATES SOIL TEMPERATURES
AND DOES NOT INTERFERE WITH SEED GROWTH.
TYPES OF MULCHES WITHIN THIS SPECIFICATION INCLUDE, BUT ARE NOT LIMITED TO:
HAY:  THE DRIED STEMS AND LEAFY PARTS OF PLANTS CUT AND HARVESTED, SUCH AS ALFALFA, CLOVERS,
OTHER FORAGE LEGUMES AND THE FINER STEMMED, LEAFY GRASSES.  STEM LENGTH SHOULD NOT AVERAGE
LESS THAN 4 INCHES.  HAY THAT CAN BE WINDBLOWN MUST BE ANCHORED.  PREFERRED MULCH WHEN SEEDING
OCCURS OUTSIDE OF THE RECOMMENDED SEEDING DATES.
STRAW: CUT AND DRIED STEMS OF HERBACEOUS PLANTS, SUCH AS WHEAT BARLEY, CEREAL RYE, OR BROOM.
THE AVERAGE STEM LENGTH SHOULD NOT BE LESS THAN 4 INCHES. STRAW THAT CAN BE WINDBLOWN SHOULD
BE ANCHORED TO HOLD IT IN PLACE.
CELLULOSE FIBER: FIBER ORIGIN IS EITHER VIRGIN WOOD, POST-INDUSTRIAL/PRE-CONSUMER WOOD OR POST
CONSUMER WOOD COMPLYING WITH MATERIALS SPECIFICATION (COLLECTIVELY REFERRED TO AS "WOOD
FIBER"), NEWSPAPER, KRAFT PAPER, CARDBOARD (COLLECTIVELY REFERRED TO AS "PAPER FIBER") OR A
COMBINATION OF WOOD AND PAPER FIBER. PAPER FIBER, IN PARTICULAR, SHALL NOT CONTAIN BORON, WHICH
INHIBITS SEED GERMINATION. THE CELLULOSE FIBER MUST BE MANUFACTURED IN SUCH A MANNER THAT AFTER
THE ADDITION TO AND AGITATION IN SLURRY TANKS WITH WATER, THE FIBERS IN THE SLURRY BECOME
UNIFORMLY SUSPENDED TO FORM A HOMOGENEOUS PRODUCT.  SUBSEQUENT TO HYDRAULIC SPRAYING ON THE
GROUND, THE MULCH SHALL ALLOW FOR THE ABSORPTION AND PERCOLATION OF MOISTURE AND SHALL NOT
FORM A TOUGH CRUST SUCH THAT IT INTERFERES WITH SEED GERMINATION OR GROWTH. GENERALLY APPLIED
WITH TACKIFIER AND FERTILIZER. REFER TO MANUFACTURER'S SPECIFICATIONS FOR APPLICATION RATES
NEEDED TO ATTAIN 80%-95% COVERAGE WITHOUT INTERFERING WITH SEED GERMINATION OR PLANT GROWTH.
NOT RECOMMENDED AS A MULCH FOR USE WHEN SEEDING OCCURS OUTSIDE OF THE RECOMMENDED SEEDING
DATES.
OTHER MULCHES ALSO INCLUDE CORN STALKS AND OTHER SIMILAR ORGANIC MATERIALS PROVIDED THEY MEET THE
REQUIREMENTS LISTED IN THE FIRST PARAGRAPH OF THIS SECTION. DOES NOT INCLUDE MATERIALS SUCH AS WOOD
CHIPS, BARK CHIPS OR COCOA HULLS.
TACKIFIERS WITHIN THIS SPECIFICATION INCLUDE, BUT ARE NOT LIMITED TO:
WATER SOLUBLE MATERIALS THAT CAUSE MULCH PARTICLES TO ADHERE TO ONE ANOTHER, GENERALLY
CONSISTING OF EITHER A NATURAL VEGETABLE GUM BLENDED WITH GELLING AND HARDENING AGENTS OR A
BLEND OF HYDROPHILIC POLYMERS, RESINS, VISCOSIFIERS, STICKING AIDS AND GUMS.  GOOD FOR AREAS
INTENDED TO BE MOWED.  CELLULOSE FIBER MULCH MAY BE APPLIED AS A TACKIFIER TO OTHER MULCHES,
PROVIDED THE APPLICATION IS SUFFICIENT TO CAUSE THE OTHER MULCHES TO ADHERE TO ONE ANOTHER.
EMULSIFIED ASPHALT IS SPECIFICALLY PROHIBITED FOR USE AS TACKIFIER DUE TO ITS POTENTIAL FOR CAUSING
WATER POLLUTION FOLLOWING ITS APPLICATION.
NETTINGS WITHIN THIS SPECIFICATION INCLUDE, BUT ARE NOT LIMITED TO:
PREFABRICATED OPENWORK FABRICS MADE OF CELLULOSE CORDS, ROPES, THREADS, OR BIODEGRADABLE
SYNTHETIC MATERIAL THAT IS WOVEN, KNOTTED OR MOLDED IN SUCH A MANNER THAT IT HOLDS MULCH IN
PLACE UNTIL VEGETATION GROWTH IS SUFFICIENT TO STABILIZE THE SOIL.  GENERALLY USED IN AREAS WHERE
NO MOWING IS PLANNED.  EXAMPLES OF NETTING ARE TOBACCO NETTING (USED WHERE FLOWS ARE NOT
CONCENTRATED) AND JUTE NETTING (TYPICALLY USED IN DRAINAGEWAYS).
SUBSTITUTE MEASURES:WHERE MULCH ANCHORING IS REQUIRED A TEMPORARY EROSION CONTROL BLANKET
MAYBE USED.
SITE PREPARATION:FOLLOW REQUIREMENTS OF PERMANENT SEEDING OR TEMPORARY SEEDING.
APPLICATION
TIMING:  APPLIED IMMEDIATELY FOLLOWING SEEDING. SOME CELLULOSE FIBER MAY BE APPLIED WITH SEED TO
ASSIST IN MARKING WHERE SEED HAS BEEN SPRAYED, BUT EXPECT TO APPLY A SECOND APPLICATION OF
CELLULOSE FIBER TO MEET THE REQUIREMENTS OF MULCH FOR SEED.
SPREADING:  MULCH MATERIAL SHALL BE SPREAD UNIFORMLY BY HAND OR MACHINE RESULTING IN 80%-95%
COVERAGE OF THE DISTURBED SOIL WHEN SEEDING WITHIN THE RECOMMENDED SEEDING DATES.
APPLICATIONS THAT ARE UNEVEN CAN RESULT IN EXCESSIVE MULCH SMOTHERING THE GERMINATING SEEDS.
FOR HAY OR STRAW ANTICIPATE AN APPLICATION RATE OF 2 TONS PER ACRE. FOR CELLULOSE FIBER FOLLOW
MANUFACTURER'S RECOMMENDED APPLICATION RATES TO PROVIDE 80%-95% COVERAGE.
WHEN SEEDING OUTSIDE THE RECOMMENDED SEEDING DATES, INCREASE MULCH APPLICATION RATE TO PROVIDE
BETWEEN 95%-100% COVERAGE OF THE DISTURBED SOIL.  FOR HAY OR STRAW ANTICIPATE AN APPLICATION RATE OF
2.5 TO 3 TONS PER ACRE.
WHEN SPREADING HAY MULCH BY HAND, DIVIDE THE AREA TO BE MULCHED INTO APPROXIMATELY 1,000 SQUARE FEET
AND PLACE 1.5-2 BALES OF HAY IN EACH SECTION TO FACILITATE UNIFORM DISTRIBUTION.  FOR CELLULOSE FIBER
MULCH, EXPECT SEVERAL SPRAY PASSES TO ATTAIN ADEQUATE COVERAGE, TO ELIMINATE SHADOWING, AND TO
AVOID SLIPPAGE (SIMILAR TO SPRAYING WITH PAINT).  MACHINE CLOGGING CAN OCCUR IF PRODUCT IS IMPROPERLY
LOADED OR IF LEFTOVER PRODUCT IS LEFT IN MACHINE WITHOUT CLEANING. COMPLY WITH THE MANUFACTURER'S
RECOMMENDATIONS FOR APPLICATION REQUIREMENTS AND MULCH MATERIAL SPECIFICATIONS.
ANCHORING:  WHEN NEEDED, MULCH ANCHORING IS APPLIED EITHER WITH THE MULCH AS WITH CELLULOSE
FIBER OR APPLIED IMMEDIATELY FOLLOWING MULCH APPLICATION.  EXPECT THE NEED FOR MULCH ANCHORING
ALONG THE SHOULDERS OF ACTIVELY TRAVELED ROADS, HILL TOPS AND LONG OPEN SLOPES NOT PROTECTED
BY WIND BREAKS.
WHEN USING NETTING, THE MOST CRITICAL ASPECT IS TO ENSURE THAT THE NETTING MAINTAINS SUBSTANTIAL
CONTACT WITH THE UNDERLYING MULCH AND THE MULCH, IN TURN, MAINTAINS CONTINUOUS CONTACT WITH
THE SOIL SURFACE.  WITHOUT SUCH CONTACT, THE MATERIAL IS USELESS AND EROSION OCCURS. INSTALL IN
ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
MAINTENANCE
INSPECT MULCHED AREAS AT LEAST ONCE A WEEK AND WITHIN 24 HOURS OF THE END OF A STORM WITH A RAINFALL
AMOUNT OF 0.5 INCH OR GREATER UNTIL THE GRASS HAS GERMINATED TO DETERMINE MAINTENANCE NEEDS.
WHERE MULCH HAS BEEN MOVED OR WHERE SOIL EROSION HAS OCCURRED, DETERMINE THE CAUSE OF THE FAILURE.
IF IT WAS THE RESULT OF WIND, THEN REPAIR EROSION DAMAGE (IF ANY), RE-APPLY MULCH (AND SEED AS NEEDED)
AND CONSIDER APPLYING A NETTING OR TACKIFIER. IF MULCH FAILURE WAS CAUSED BY CONCENTRATING WATER,
INSTALL ADDITIONAL MEASURES TO CONTROL WATER AND SEDIMENT MOVEMENT, REPAIR EROSION DAMAGE,
RE-APPLY MULCH AND CONSIDER APPLYING A NETTING OR TACKIFIER OR USE THE TEMPORARY EROSION CONTROL
BLANKET MEASURE.  ONCE GRASS HAS GERMINATED, INSPECTIONS SHOULD CONTINUE AS REQUIRED BY TEMPORARY
SEEDING AND PERMANENT SEEDING.
PROJECT NARRATIVE:
THE PROPOSED PROJECT  CONSISTS OF THE CONSTRUCTION OF A PEDESTRIAN WALKING PATH IN THE TOWN PARK.  THE PURPOSE OF THE
WALK IS TO CONNECT THE EXISTING BITUMINOUS WALK WITH A NEW WALK THAT WILL PROVIDE AN ACCESSIBLE ROUTE TO THE ROVERS
SOCCER FIELDS.  THE EXISTING WOODS TRAIL FROM THE PARKING LOT TO THE NORTHERNMOST FIELD WILL BE REBUILT IN IT'S CURRENT
LOCATION.  A SERIES OF STAIRS WILL BE ADDED TO THE PATH TO EASE THE ASSENT OF THE STEEP SLOPE.
THE PROJECT AREA IS APPROXIMATELY 25,580 S.F OF THE EXISTING 116 ACRE PARK.  THE 5-FT WIDE NEW BITUMINOUS WALK WILL BE
APPROXIMATELY 1514 FEET LONG COVERING 7680 SF AND WILL MOSTLY BE LOCATED IN EXISTING GRASSED AREAS.   PROPOSED GRADES WILL
MOSTLY MATCH THE EXISTING GRADES.  THE WALK WILL BE CONSTRUCTED OF BITUMINOUS CONCRETE AS IS INTENDED FOR PEDESTRIAN
WALKING USE.  THE PROPOSED WOODS TRAIL WILL FOLLOW THE EXISTING ROUTE.  THE PATH WILL BE REBUILT AS A 6-FT WIDE  STONE DUST
PATH WITH STAIRS.  THE THE PATH IS 630-FT LONG AND COVERS APPROXIMATELY 3790 S.F.
THE SITE CONTAINS APPROXIMATELY 2,693,000 SF (61.8 AC.) OF WETLAND SOILS AND WATERCOURSES.  THE WETLAND SOILS ARE  OCCUM FINE
SANDY LOAM AND SUNCOOK LOAMY FINE SAND WHICH ARE ALLUVIAL AND FLOOD PLAIN SOILS.  THEY ARE PRESENTLY COVERED BY 89,358 SF
(2.1 AC.) OF IMPERVIOUS SURFACE.  APPROXIMATELY 1,600 LF (8000 SF) OF BITUMINOUS WALK WILL BE LOCATED IN WETLAND (FLOODPLAIN)
SOILS.  THE RECONSTRUCTED WOODS PATH WILL COVER APPROXIMATELY 2722 S.F. OF WETLANDS/REGULATED AREA.  IN ADDITION, A TOTAL
OF 15,000 SF OF WETLAND (FLOODPLAIN) AREA WILL BE DISTURBED.  ALL EXCEPT 9960 SF. WILL BE TEMPORARY.
THE BALANCE OF THE SITE CONTAINS HINCKLEY GRAVELY SANDY LOAM SOILS OR IS HINCKLEY URBAN LAND COMPLEX.  OTHER THAN THE
FLOOD PLAIN SOILS, THERE ARE NO SIGNIFICANT AREAS OF WETLAND SOILS. EXCEPT FOR THE AREA ADJACENT TO THE WEST BRANCH OF
SALMON BROOK WHICH IS LOCATED ALONG THE WESTERLY BORDER OF THE PROJECT.  THERE ARE NO ACTIVITIES PROPOSED WITHIN THE
BROOK AND EXISTING DRAINAGE PATTERNS WILL BE MAINTAINED.
TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES WILL BE IMPLEMENTED DURING CONSTRUCTION.  THE ANTICIPATED
CONSTRUCTION WILL BEGIN IN THE SPRING OF 2027 AND END IN THE FALL OF 2027.
THE RESPONSIBLE PARTY IS:
SANDRA YOST
DIRECTOR OF COMMUNITY SERVICES
TOWN OF GRANBY
860-844-5351
MITIGATION ACTIVITIES NARRATIVE:
IMPACTS ASSOCIATED WITH THE CONSTRUCTION AND MAINTENANCE OF THE PROPOSED SIDEWALK AND SITTING AREAS ARE MINIMAL, LIMITED
TO THE ADDITION OF IMPERVIOUS AREA WITHIN AN ALLUVIAL WETLAND AND THE URA OF THE SALMON BROOK. THE AREA WHERE THE
SIDEWALK WILL BE INSTALLED IS CURRENTLY MAINTAINED LAWN FOR RECREATION, AND AS PART OF THE PROJECT THE LAWN AREA WILL BE
RESTORED TO NATIVE VEGETATION AS DESIGNATED BY THE FOLLOWING MITIGATION PLAN BELOW AND AS DEPICTED ON THE “PLAN TOWN OF
GRANBY SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING, 215 SALMON BROOK STREET, GRANBY, CT”, DATED 9.3.26, COVER SHEET,
C1-C4 AND DE1-DE3, AS AMENDED.
POTENTIAL IMPACTS DURING CONSTRUCTION ARE LIMITED TO SEDIMENT MIGRATION FROM THE CONSTRUCTION AREA INTO A REGULATED
AREA. AS SEEN DURING THE FIRST PHASE OF THE SIDEWALK, SOIL DISTURBANCE ASSOCIATED WITH THIS PROJECT IS MINIMAL AND
TEMPORARY. BARRIER EROSION CONTROLS WILL BE TEMPORARILY PLACED AS NECESSARY TO PREVENT SEDIMENT MIGRATION DURING
PRECIPITATION EVENTS, AND THE AREA WILL BE SEEDED AND MULCHED AS SOON AS POSSIBLE. A QUICK GERMINATING SEED MIX WILL
PROVIDE FOR BOTH RAPID AND LONG-TERM VEGETATIVE STABILIZATION.
THIS PROJECT COULD POTENTIALLY FIT THE REQUIREMENTS OF A NONREGULATED USE, DUE TO THE GOAL OF PROVIDING EQUITABLE
OUTDOOR RECREATION OPPORTUNITIES, HOWEVER, IT REQUIRES A GOOD AMOUNT OF DISTURBANCE AND THEREFORE A PERMIT IS
REQUESTED. THE TOWN PROPOSES TO INCORPORATE VEGETATION MANAGEMENT AND PLANTING EFFORTS AT KEY AREAS ALONG THE
PROJECT ROUTE. THESE AREAS WERE SELECTED WHERE AREAS COULD USE DEEPLY ROOTED VEGETATION FOR LONG-TERM SOIL
STABILIZATION MEASURES ADJACENT TO THE SALMON BROOK. PLANTINGS IN THE CHOSEN LOCATIONS WILL PROVIDE ADDITIONAL
VEGETATIVE BUFFERS ALONG SALMON BROOK, AIDING IN LONG-TERM BANK STABILITY AND PARK/PROJECT PROTECTION.
MITIGATION EFFORTS SHALL BE SUPERVISED DAILY DURING VEGETATION REMOVAL AND PLANTING OPERATIONS BY THE GRANBY WETLANDS
AGENT OR THE IWWC DESIGNEE. THESE EFFORTS SHALL INCLUDE INVASIVE SPECIES REMOVAL, SOIL STABILIZATION PLANTINGS, AND
SIGNAGE AT A SALMON BROOK ACCESS TRAIL. THE FOLLOWING DESCRIBES THE MITIGATION ACTIVITIES IN DETAIL FOR THE PROJECT,
INCLUDING HOW EACH MITIGATION AREA SHALL BE TREATED.
SITEWIDE:
ALONG THE PROJECT ROUTE, ALL VINES THAT ARE CHOKING TREES SHALL BE CUT AT THEIR BASE AND AN HERBICIDE APPLIED TO THE
FRESH CUT STUMP. A CONE SPRAYER OR PAINT ON METHOD MAY BE UTILIZED AND APPLIED IN ACCORDANCE WITH ALL APPLICABLE
LAWS.
THE EXTENT OF ORIENTAL BITTERSWEET (CELASTRUS ORBICULATUS) IN SOME LOCATIONS IS EXTENSIVE, AND COMPLETE ERADICATION
IS HIGHLY UNLIKELY DUE TO THE RIVERINE LOCATION PROVIDING A CONSTANT SEED SOURCE FOR POTENTIAL SPECIES 
RE-ESTABLISHMENT. THEREFORE, A MORE REALISTIC GOAL IS TO PRESERVE MATURE TREES THAT ARE BEING “STRANGLED” BY VINES.
VINES DO NOT NEED TO BE REMOVED FROM THE TREE OR THE SITE BUT ALLOWED TO DEGRADE IN PLACE.
AS DIRECTED BY THE SUPERVISING IWWC DESIGNEE, TARGET INVASIVE SPECIES SHALL BE REMOVED AND PROPERLY DISPOSED. THE
TARGET SPECIES INCLUDES BUT IS NOT LIMITED TO LARGE AUTUMN OLIVE (ELAEAGNUM UMBELLATA) AND MULTIFLORA ROSE (ROSA
MULTIFLORA) SPECIES.
AREA 1:
THIS AREA IS ADJACENT TO A BEND IN THE SALMON BROOK AND IS CURRENTLY MAINTAINED LAWN. TO AID IN PRESERVING THE UPLAND
AREA ADJACENT TO THE BANKS, 3 TREES AND 10 SHRUBS ARE RECOMMENDED TO BE INSTALLED IN THIS AREA. INCLUDED IN THIS AREA
ARE 3 PERENNIAL ISLANDS, EACH PERENNIAL ISLAND SHALL INCLUDE 6 HERBACEOUS PLANTINGS. IT IS RECOMMENDED THAT THE AREA
CONTINUE TO BE MOWED BETWEEN THE TREE AND SHRUBS FOR 2 YEARS, OR LONGER IF APPROVED, TO PREVENT INVASIVE SPECIES
OVERGROWTH. ONCE STRONG ESTABLISHMENT OF PLANTINGS, THE AREA MAY NO LONGER BE MOWED. ALL PLANTINGS SHALL BE 
CLEARLY STAKED.
AREA 2:
THIS AREA IS VEGETATED BUT DOES NOT CONTAIN ANY CANOPY TREES. IT IS PROPOSED TO INSTALL 1 TREE IN THIS LOCATION THAT IS
GREATER THAN 6 FEET TALL. AN AREA AROUND THE TREE INSTALLATION AREA SHALL BE CLEARED OF INVASIVE SPECIES. MOWING 
AROUND INSTALLED TREES SHALL OCCUR FOR 2 FULL GROWING SEASONS.
AREA 3:
THIS AREA IS VEGETATED BUT DOES NOT CONTAIN ANY CANOPY TREES. IT IS PROPOSED TO INSTALL 2 TREES AND 6 SHRUBS IN THIS
LOCATION THAT IS GREATER THAN 6 FEET TALL. AN AREA AROUND THE TREE INSTALLATION AREA SHALL BE CLEARED OF INVASIVE 
SPECIES. MOWING AROUND INSTALLED TREES SHALL OCCUR FOR 2 FULL GROWING SEASONS.
AREA 4:
THIS AREA IS VEGETATED BUT DOES NOT CONTAIN ANY CANOPY TREES. IT IS PROPOSED TO INSTALL 1 TREE IN THIS LOCATION THAT IS
GREATER THAN 6 FEET TALL. AN AREA AROUND THE TREE INSTALLATION AREA SHALL BE CLEARED OF INVASIVE SPECIES. MOWING 
AROUND INSTALLED TREES SHALL OCCUR FOR 2 FULL GROWING SEASONS.
AREA 5:
ALONG THE TREE LINE, A LINE OF HERBACEOUS PERENNIALS ARE PROPOSED TO BE INSTALLED. THIS WILL INCREASE THE ROOT PROFILE
AND REDUCE MOWING IN THIS CRITICAL LOCATION.
AREA 6:
THIS AREA IS VEGETATED BUT DOES NOT CONTAIN ANY CANOPY TREES. IT IS PROPOSED TO INSTALL 2 TREES AND 6 SHRUBS IN THIS
LOCATION THAT IS GREATER THAN 6 FEET TALL. AN AREA AROUND THE TREE INSTALLATION AREA SHALL BE CLEARED OF INVASIVE 
SPECIES. MOWING AROUND INSTALLED TREES SHALL OCCUR FOR 2 FULL GROWING SEASONS.
VEGETATION PLANTING SPECIES SELECTION:
TREES: RED MAPLE (ACER RUBRUM), SHAGBARK HICKORY (CARYA OVATA), AMERICAN ELM (ULMUS AMERICANA), COTTONWOOD
(POPULUS DELTOIDES), AND AMERICAN SYCAMORE (PLATANUS OCCIDENTALIS).
SHRUBS:  STAGHORN SUMAC (RHUS TYPHINA), SWEET PEPPERBUSH (CLETHRA ALNIFOLIA), AND ELDERBERRY (SAMBUCUS 
ANADENSIS)
HERBACEOUS PERENNIALS: COMMON MILKWEED (ASCLEPIAS SYRIACA), BLACK-EYED SUSAN (RUDBECKIA HIRTA), 
BROWN-EYED SUSAN (RUDBECKIA TRILOBA)
NO.DATEDESCRIPTION
REVISIONS
GRANBY TOWN HALL
15 NORTH GRANBY ROAD
GRANBY, CONNECTICUT 06035
PHONE: (860) 844-5318     FAX:  (860) 844-5325
TOWN OF GRANBY
ENGINEERING DEPARTMENT
SCALE:DATE:JOB #:SHEET:
 1"=20'SEPTEMBER 3, 2026 2025.G01DE-3
DETAILS & NOTES
TOWN OF GRANBY
SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING
215 SALMON BROOK STREET
GRANBY, CONNECTICUT

Page 111

Page 112

TOWN OF GRANBY 
Incorporated 1786 
15 North Granby Road 
Granby, Connecticut 06035-2102 
 
September 4, 2026 
 
Paige and Brandon Richard 
54 Hartford Avenue 
Granby, CT 06035 
 
RE: 54 Hartford Avenue – B. Richard – Permit request to place a 14’x24’ prefabricated shed on a 
16’x26’ crushed stone base with future underground electrical conduit. 
 
Dear Mr. and Mrs. Richard: 
 
Please be advised that on September 4, 2026, the Inland Wetlands and Watercourses Commission 
(IWWC) Agent approved the subject application in accordance with the application and supporting 
documentation received to date.  
 
The following are the conditions of this approval.  
 
1. The Office of Community Development shall be notified at least 48 hours prior to the start of any 
construction activities. 
 
2. Town staff shall inspect installed erosion controls prior to the start of any work that results in earth 
disturbance activities, this includes, but is not limited to, grubbing and stump removal. 
 
3. All work shall be in conformance with the approval and application materials as submitted for this 
Permit Approval. Any modifications to the approved plans must be reviewed and approved by the 
Granby Inland Wetlands and Watercourses Commission or their designated Agent.  
 
4. Erosion controls shall be maintained to prevent sediment migration from the project area until the site 
has achieved permanent stabilization. Permanent stabilization is defined as 70% permanent 
vegetation covering over 90% of the area. A stockpile of erosion controls shall remain on site to 
prepare controls as necessary. The IWWC shall be notified in writing at least 48 hours in advance of 
erosion controls being removed.  
 
5. Excavated soil shall not be brought off-property without the notification and approval of the Office of 
Community Development. The applicant shall supply the destination in writing for any excavated soil 
removed from the property.  
 
6. This permit is valid for a period of 5 years from the date of issuance. 
 
7. A Building Permit is required for the construction of the shed and future electrical work.  
 
8. Upon completion of construction and site stabilization, the IWWC shall be notified in writing that work 
is complete, and a final inspection may be completed at that time. 
 
If you have any questions, please call me at your earliest convenience.  
 
Sincerely, 
 
 
 
 
Kate Bednaz 
Town of Granby  
IWWC Wetlands Agent 