Towns / Granby / Inland Wetlands & Watercourses Commission / Sep 9, 2026
Inland Wetlands & Watercourses Commission, Sep 9, 2026
Granby Inland Wetlands & Watercourses Commission Hide agendas that already have minutesDocuments
| Type | Document | Pages | Open |
|---|---|---|---|
| minutesminutes | IWWC Minutes | 4 | PDF download · town site |
| agenda | IWWC Agenda | 1 | PDF download · town site |
| packetpacket | IWWC Meeting Packet Not attached: this packet is 62 MB, too large to host here. Use the town site link. |
120 | town site |
Summary of the minutes
AI-generated summary. Each line links to the PDF page it came from; check it before relying on it.
Read the official minutes (PDF, 4 pages) The PDF is the record; this summary is a guide to it.
The Granby Inland Wetlands and Watercourses Commission approved the August 12, 2026 minutes and continued several applications, including the 37 Hartford Avenue public hearing, to the next regular meeting. It also ruled that a farming activity at 90 Salmon Brook and 35 Floydville Road is as of right, and it received and continued the Town of Granby walking path permit application.
Decisions (8) · all reported votes
- Approval of August 12, 2026 Meeting Minutes
Approved as presented; J. Laudati and S. Okie abstained.
Vote: Motion by D. Tolli, seconded by S. Okie, carried 4-0-0 · p. 1 - 37 Hartford Avenue – F. Devine – Permit application for regulated activities (16-unit apartment building)
Public hearing continued to the next regular meeting on October 14, 2026, at the request of Ron Levesque of R Levesque Associates, Inc.
Vote: Motion by S. Okie, seconded by B. Schmitt, carried 6-0-0 · p. 1, p. 2 - 7 Laurel Drive – C. Fontaine and R. Weiner – Show Cause Hearing for regulated activity without a valid IWWC Permit
Application received and continued to the next regular meeting.
Vote: Motion by D. Tolli, seconded by S. Okie, carried 6-0-0 · p. 2 - 12 Northwoods Road – N. Kimball and M. Nasshan – Request for Review for pond maintenance
Application received and continued to the next regular meeting; applicants directed to calculate total volume of disturbed area, consider a pumping and diversion plan, and locate a stockpile or spread location onsite.
Vote: Motion by D. Tolli, seconded by B. Schmitt, carried 6-0-0 · p. 2 - 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – Request for Review for mitigation and site stabilization
Commission determined the proposed activity is As of Right under the farming provision in Section 4.1a.
Vote: Motion by S. Okie, seconded by D. Tolli, carried 6-0-0 · p. 3 - 53 West Granby Road and 215 Salmon Brook Street – Town of Granby – Permit application for walking path within regulated area
Application received and continued to the next regular meeting. Project includes a 1,514-foot bituminous path, a 630-foot stone dust path with stairs, and 15,000 square feet of wetland (floodplain) area disturbed, of which 9,960 square feet is temporary.
Vote: Motion by D. Tolli, seconded by N. Dethlefsen, carried 6-0-0 · p. 3 - 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Agent update on regulated activity without a valid IWWC Permit
Item continued to the next regular meeting; property owner directed to provide boundaries of disturbance, a wetland delineation, and a mitigation plan for the entire site.
Vote: Motion by D. Tolli, seconded by B. Schmitt, carried 5-0-0 · p. 3, p. 4 - Adjournment
Meeting adjourned at 9:58 p.m.
Vote: Motion by N. Dethlefsen, seconded by B. Schmitt, carried 4-0-0 · p. 4
Also discussed (1)
- 54 Hartford Avenue – B. Richard – Permit request for 14’x24’ prefabricated shed (Authorized Agent approval 9/4/26): Agent update only; no Commission action recorded. Agent reported on bridge installation at 15 Peck Orchard Road, stating everything was in good order. · p. 4
Summary of the agenda: IWWC Agenda
AI-generated summary.
This is the Granby Inland Wetlands and Watercourses Commission agenda for its September 9, 2026 regular meeting. It lists public hearings, a show cause hearing, requests for review, a permit request, and agent and commissioner reports.
On the agenda (9)
- Action on the August 12, 2026, Meeting Minutes · p. 1
- Public Hearing: 37 Hartford Avenue – F. Devine – Permit application for regulated activities in connection with the development of a 16-unit apartment building and associated site improvements (opened and continued from 7/8/26) · p. 1
- Show Cause Hearing: 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a Regulated Activity without a valid IWWC Permit (opened and continued from 7/8/26) · p. 1
- Request for Review: 12 Northwoods Road – N. Kimball and M. Nasshan – RFR to conduct pond maintenance · p. 1
- Request for Review: 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – RFR for mitigation and site stabilization within a regulated area · p. 1
- Permit Request: 53 West Granby Road and 215 Salmon Brook Street – Town of Granby – Permit application to construct a walking path and associated improvements within a regulated area · p. 1
- Agent Report: Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated Activity without a valid IWWC Permit · p. 1
- Agent Report: 54 Hartford Avenue – B. Richard – Permit request to construct a 14’x24’ prefabricated shed on crushed stone within a regulated area. Authorized Agent approval 9/4/26: ; agent approval noted as 9/4/26 · p. 1
- Passage 1: Materials for display deadline (10 AM email, no late materials): Procedural notice on materials for video display; no decision recorded · p. 1
Full text of the documents
View the minutes PDF on this page (IWWC Minutes)
Text of the minutes (IWWC Minutes, 4 pages)
Page 1 · open in PDF
1 MEETING MINUTES Town of Granby Inland Wetlands and Watercourses Commission Wednesday, September 9, 2026, at 7:00 p.m. PRESENT: Nick Dethlefsen, David Tolli, Sue Okie, John Laudati, Barbara Schmitt, and Fred Jones (via Zoom) ALSO PRESENT: IWWC Agent Kate Bednaz and Land Use Coordinator Renee Deltenre 1. Call to Order Chair J. Laudati called the meeting to order at 7:00 p.m. 2. Action on the August 12, 2026, Meeting Minutes ON A MOTION by D. Tolli, seconded by S. Okie, the Commission voted 4-0-0 to approve the August 12, 2026, minutes as presented. J. Laudati and S. Okie abstained. 3. Public Hearings a. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in connection with the development of a 16-unit apartment building and associated site improvements. Professional Engineer Rebecca Li was present to discuss the application. Since the last meeting in August, septic approval was received from the CT Department of Public Health and Farmington Valley Health District. R. Li provided additional application material, which consisted of a project timeline and map of the project area indicating septic system locations for the abutting properties. K. Bednaz provided her latest review comments, indicating that all concerns have been addressed and it is her opinion that the functions and values of the existing wetlands system will not be impacted by this development. Public Comment Attorney George Schober spoke on behalf of his client Peter Voskowsky, who is an abutting property owner. He requested a continuance of the public hearing so that Professional Engineer Steve Trinkaus may have time to review the newly submitted material. Attorney Schober proposed feasible and prudent alternatives, such as connecting to public sewer or reducing the unit count and expressed concerns regarding hydrology and contamination. Reinhard Maier, 138 Day Street, had concerns regarding the proposed septic and leaching system as it pertains to nitrogen dilution and groundwater pollution. Robert Flanigan, 24 Woodcliff Drive, expressed concerns regarding potential wetlands contamination due to seepage of effluent, as well as surface treatment of the parking lot during the winter months.
Page 2 · open in PDF
2 Maureen Eberly, 37 Silkey Road, questioned the legitimacy of the test pit results, invasive species located on site and stated that the development shall connect to public sewer. Ron Levesque of R Levesque Associates, Inc. spoke on behalf of the project and submitted a formal request to continue the public hearing to the next regular meeting on October 14, 2026. ON A MOTION by S. Okie seconded by B. Schmitt, the Commission voted 6-0-0 to continue the public hearing to the next regular meeting. 4. Show Cause Hearing a. 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a Regulated Activity without a valid IWWC Permit. Professional Engineer TJ Barresi, as well as property owners Colleen Fontaine and Ross Weiner were present to discuss their application, which was submitted in response to the Enforcement Order issued on 7/2/26. The property owners are seeking permission to install an 18” drainage pipe, re-establish a grass line swale, remove six pine trees, place a prefabricated shed, install a split-rail fence and restore the existing lawn within a regulated area. Discussion ensued regarding the Enforcement Order from the prior owners and how the situation was resolved prior to the sale of the home. K. Bednaz provided feedback on the application, requesting that the elevations be checked and the mitigation plan consist of a 1:1 wetland restoration ratio. ON A MOTION by D. Tolli seconded by S. Okie, the Commission voted 6-0-0 to receive and continue the application to the next regular meeting. 5. Request for Review a. 12 Northwoods Road – N. Kimball and M. Nasshan – RFR to conduct pond maintenance. Applicants/property owners Nicholas Kimball and Marissa Nasshan were present to discuss their request for review. They are seeking permission to remove sediment and overgrown vegetation from an existing fire pond on their property. Over the summer large volumes of rainwater and sediment have accumulated, thus encouraging the rapid growth of vegetation that is hindering stream flow and potential backup at the existing culvert. The subject area is approximately 40 square feet, and an excavator would be utilized from the driveway to remove the material. K. Bednaz provided feedback on the application, noting that additional information is required. The applicants were directed to calculate the total volume of disturbed area, which will determine if an IWWC permit is required, consider a pumping and diversion plan, and locate a suitable location to stockpile or spread the sediment onsite. ON A MOTION by D. Tolli seconded by B. Schmitt, the Commission voted 6-0-0 to receive and continue the application to the next regular meeting.
Page 3 · open in PDF
3 b. 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – RFR for mitigation and site stabilization within a regulated area. Aaron Svedlow of Greenfield Development and Kevin Sullivan were present on behalf of Broadleaf Solar to discuss the application. K. Sullivan explained that sorghum was planted to establish a cover cop that would address erosion issues and stabilize the area. In due time, the existing crop will either be mowed and left as a thatch, or it may be mowed down and tilled into the soil to establish another crop. K. Bednaz provided a brief overview of the project, noting a failure among the erosion and sedimentation controls last month. 218 acres were tilled and planted, and silt fence and waddles were also installed to help control erosion. K. Bednaz indicated that an IWWC Permit is required to address the aftermath of the erosion, detailing how much sediment was removed, where it was deposited, how it will be removed, a mitigation plan, and timeline. ON A MOTION by S. Okie seconded by D. Tolli, the Commission voted 6-0-0 that the proposed activity is As of Right under the farming provision in Section 4.1a. 6. Permit Requests a. 53 West Granby Road and 215 Salmon Brook Street – Town of Granby – Permit application to construct a walking path and associated improvements within a regulated area. K. Bednaz presented the application on behalf of the Town of Granby, which was received by the Commission this evening. The proposal consists of constructing a pedestrian walking path from the parking lot located at 53 West Granby Road to the soccer fields located at 215 Salmon Brook Street (Salmon Brook Park). The path will be constructed in the same location of the existing woods trail and consists of a series of stairs to address the steep slope. The total project area is approximately 25,580 square feet and will have a five-foot wide, 1,514-foot bituminous concrete path within the existing grass area and a six-foot wide, 630-foot stone dust path with stairs within the woods. Approximately 1,600 feet of bituminous walk will be located in wetland (floodplain) soils, and the reconstructed woods path will cover approximately 2,722 square feet of wetlands/regulated area. In addition, a total of 15,000 square feet of wetland (floodplain) area will be disturbed; of which 9,960 square feet will be temporary. ON A MOTION by D. Tolli seconded by N. Dethlefsen, the Commission voted 6-0-0 to receive and continue the application to the next regular meeting. J. Laudati left the meeting at 9:15 p.m. 7. Agent Report and Correspondence a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated Activity without a valid IWWC Permit. Attorney Timothy Furey was present on behalf of the property owner to provide updates, along with Soil Scientist David Lord who addressed comments raised at the prior meeting. Attorney Furey noted that revised drawings were recently submitted to DEEP from Professional Engineer Karl Acimovic and Robert Green Associates, LLC. D.
Page 4 · open in PDF
4 Lord discussed existing conditions related to soil erosion and sedimentation, as well as existing wetlands in the paddock areas. K. Bednaz reiterated that an existing conditions and comprehensive mitigation plan for the areas outside of DEEP’s jurisdiction has not been submitted. Since no mapped wetlands delineation has been provided, she requested a meeting on-site to view and discuss the flagged wetlands in order to move things forward. In advance of the next meeting, the property owner was directed to provide the boundaries of disturbance, along with a wetland delineation and mitigation plan for the entire site. ON A MOTION by D. Tolli seconded by B. Schmitt, the Commission voted 5-0-0 to continue this agenda item to the next regular meeting. F. Jones left the meeting at 9:54 p.m. b. 54 Hartford Avenue – B. Richard – Permit request to construct a 14’x24’ prefabricated shed on crushed stone within a regulated area. Authorized Agent approval 9/4/26. K. Bednaz provided an update regarding the bridge installation at 15 Peck Orchard Road, stating that everything was in good order. 8. Commissioner Reports and Correspondence None 9. Adjourn ON A MOTION by N. Dethlefsen seconded by B. Schmitt, the Commission voted 4-0-0 to adjourn the meeting at 9:58p.m. Respectfully submitted, Renee Deltenre Land Use Coordinator
View the agenda PDF on this page (IWWC Agenda)
Text of the agenda (IWWC Agenda, 1 page)
Page 1 · open in PDF
Town of Granby Inland Wetlands and Watercourses Commission Regular Meeting Agenda Wednesday, September 9, 2026, at 7:00 pm Town Hall Meeting Room Please note: Any person who wishes to provide materials for display on the video monitors at an IWWC meeting where such monitors are being used to video conference the meetings must email the materials no later than 10 AM on the day of the meeting. All materials must be contained in a single attachment to the email. Materials received after the 10 AM deadline will not be accepted for display. Display of the materials is subject to all other rules and procedures of the IWWC. Zip drive, memory sticks and other data storage devices will not be accepted. Zoom: https://us06web.zoom.us/j/88097165233?pwd=BeaLXJaV2bhzELdbzFhI2QZs2Ne0un.1 Call In: 929-205-6099 Meeting ID: 880 9716 5233 Passcode: 244134 1. Call to Order 2. Action on the August 12, 2026, Meeting Minutes 3. Public Hearings a. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in connection with the development of a 16-unit apartment building and associated site improvements. (Hearing opened and continued from 7/8/26) 4. Show Cause Hearing a. 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a Regulated Activity without a valid IWWC Permit. (Hearing opened and continued from 7/8/26) 5. Request for Review a. 12 Northwoods Road – N. Kimball and M. Nasshan – RFR to conduct pond maintenance. b. 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – RFR for mitigation and site stabilization within a regulated area. 6. Permit Requests a. 53 West Granby Road and 215 Salmon Brook Street – Town of Granby – Permit application to construct a walking path and associated improvements within a regulated area. 7. Agent Report and Correspondence a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated Activity without a valid IWWC Permit. b. 54 Hartford Avenue – B. Richard – Permit request to construct a 14’x24’ prefabricated shed on crushed stone within a regulated area. Authorized Agent approval 9/4/26. 8. Commissioner Reports and Correspondence 9. Adjourn
Text of the packet (IWWC Meeting Packet, 120 pages)
Page 1
Town of Granby Inland Wetlands and Watercourses Commission Regular Meeting Agenda Wednesday, September 9, 2026, at 7:00 pm Town Hall Meeting Room Please note: Any person who wishes to provide materials for display on the video monitors at an IWWC meeting where such monitors are being used to video conference the meetings must email the materials no later than 10 AM on the day of the meeting. All materials must be contained in a single attachment to the email. Materials received after the 10 AM deadline will not be accepted for display. Display of the materials is subject to all other rules and procedures of the IWWC. Zip drive, memory sticks and other data storage devices will not be accepted. Zoom: https://us06web.zoom.us/j/88097165233?pwd=BeaLXJaV2bhzELdbzFhI2QZs2Ne0un.1 Call In: 929-205-6099 Meeting ID: 880 9716 5233 Passcode: 244134 1. Call to Order 2. Action on the August 12, 2026, Meeting Minutes 3. Public Hearings a. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in connection with the development of a 16-unit apartment building and associated site improvements. (Hearing opened and continued from 7/8/26) 4. Show Cause Hearing a. 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a Regulated Activity without a valid IWWC Permit. (Hearing opened and continued from 7/8/26) 5. Request for Review a. 12 Northwoods Road – N. Kimball and M. Nasshan – RFR to conduct pond maintenance. b. 90 Salmon Brook and 35 Floydville Road – J. Gravel c/o Broadleaf Solar – RFR for mitigation and site stabilization within a regulated area. 6. Permit Requests a. 53 West Granby Road and 215 Salmon Brook Street – Town of Granby – Permit application to construct a walking path and associated improvements within a regulated area. 7. Agent Report and Correspondence a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated Activity without a valid IWWC Permit. b. 54 Hartford Avenue – B. Richard – Permit request to construct a 14’x24’ prefabricated shed on crushed stone within a regulated area. Authorized Agent approval 9/4/26. 8. Commissioner Reports and Correspondence 9. Adjourn
Page 2
Page 3
1 MEETING MINUTES Town of Granby Inland Wetlands and Watercourses Commission Wednesday, August 12, 2026, at 7:00 p.m. PRESENT: Nick Dethlefsen, Vickie Dirienzo, Fred Jones, Barbara Schmitt, and David Tolli ALSO PRESENT: IWWC Agent Kate Bednaz 1. Call to Order Acting Chair V. Dirienzo called the meeting to order at 7:00 p.m. 2. Action on the July 8, 2026, Meeting Minutes ON A MOTION by D. Tolli, seconded by B. Scmitt, the Commission voted 4-0-1 to approve the July 8, 2026, minutes as presented. V. Dirienzo abstained. 3. Permit Requests a. 5 Godard Road – H. Werner and S. Werner – Permit request to construct a single- family home and detached garage with associated site improvements within a regulated area. S. Werner, 5 Godard Road, reported she has been in touch with the Wetlands Agent, and all outstanding items have been addressed and are reflected in the revised plans. K. Bednaz provided an overview of the plans, explaining the changes. S. Werner noted that Farmington Valley Health District approved the septic system design. A draft approval letter was provided to the Commission for review. K. Bednaz stated for the record the proposed conditions of approval, which include the regulated area that will be marked on site; pond maintenance and repair will be addressed as part of the house construction; a mylar of the as-built will be filed; and a bond will be submitted. ON A MOTION by F. Jones, seconded by N. Dethlefsen, the Commission voted 5-0-0 to approve the application and approval letter as presented. b. 215 Salmon Brook Street – Town of Granby – Permit request to construct a gazebo on a concrete pad within a regulated area. K. Bednaz provided an overview of the application, noting this was received at the Commission’s July meeting. The project includes the installation of a concrete pad and construction of a gazebo. It was also noted the project includes the installation of eight concrete pads adjacent to the walking path to accommodate benches. The Commission reviewed the draft approval letter with the standard conditions of approval. ON A MOTION by F. Jones, seconded by B. Schmitt, the Commission voted 5-0-0 to approve the application and approval letter as presented. 4. Request for Review a. 90 Salmon Brook Street and 35 Floydville – J. Gravel c/o Broadleaf Solar – RFR to address pre-existing soil/erosion concerns and establish a vegetative cover.
Page 4
2 J. Gravel, representing Broadleaf Solar, presented to the Commission. He explained the site had some erosion issues so they thought it would be best to establish a cover crop to help stabilize the site. Working with Kevin Sullivan, sorghum was planted, which in addition to stabilizing the area, helps add nutrients. Silt fence and waddles were also installed to help control erosion. In response to a question, it was noted that the crop may be mowed down and left as a thatch or it may be mowed down then folded back into the soil to establish another crop. Both approaches would prevent erosion. K. Bednaz provided information about the site visit and further explained the request for review. It was also noted while on site, the breach of erosion controls was observed. The applicant will work on a plan to address and correct this. In response to a question, J. Gravel provided an overview of the siting council process to date. ON A MOTION by B. Schmitt, seconded by D. Tolli, the Commission voted 5-0-0 that the proposed activity is as of right under the farming provision in Section 4.1a. 5. Public Hearings a. 199 Broad Hill Road – T. Kurnicki – Permit request to construct a single-family home with associated site improvements within a regulated area. (Hearing opened and continued from 7/8/26) T. Kurnicki presented to the Commission. He explained that there were changes to the plans in response to the comments, including the protection of the steep slope. The slope will remain as is and only those areas in proximity to the house and septic would be disturbed. A planting schedule with native plants and shrubs was included to limit potential erosion around the driveway and other disturbed areas. Removal of invasive species will be included as part of the project as well. In response to a question, it was explained that there is an existing driveway that will be regarded to access the property. The Commission noted that the proposed size of the trees may be problematic in terms of the root ball and disturbed area; it was suggested that smaller trees be planted. There were no comments from the public. The Commission reviewed the draft approval letter that was revised after the packet was posted. Changes include an increase in the bond amount to $2,000. It was also noted that there may be an eastern box turtle habitat on the property, which is reflected in the draft approval letter. The Commission discussed invasive species. It was agreed that condition 14 should be added to the letter, which states, “Invasive species within the wetland resource area shall be removed without soil disturbance.” It was noted that on Sheet 9, the note about invasive species shall be changed to include removal of species within the wetland area. The public hearing was closed. ON A MOTION by F. Jones, seconded by N. Dethlefsen, the Commission voted 5-0-0- to approve the application and approval letter as revised with the 14 conditions. b. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in connection with the development of a 16-unit apartment building and associated site improvements.
Page 5
3 Professional Engineer Rebecca Li was present to discuss the application. Since the last meeting in July, the plan set was revised to reflect staff comments. It was noted that Sean Merrigan with CT Department of Public Health was unable to review the revisions before leaving for vacation. However, the revised plans were submitted to town staff for review. R. Li went through the response memo, noting how all staff comments were addressed on the revised plan set, starting with the Town Engineer comments. It was noted the Town Engineer confirmed the plan set addresses his comments. R. Li the continued with the Wetlands Agent comments. The Commission questioned the requirement for nitrogen dilution calculations for the septic system. R. Li noted that this assessment is not required under the technical standards for a system this size but given the history of this site, the information was submitted and the calculations show the project is under the 10 milligrams per liter for the drinking water standard. She also stated that the septic system has been moved as close to the road as possible. The Commission questioned the proposed trees on the slope and at the bottom of the slope. Plantings along the parking lot were also discussed and pruning practices were questioned. The Commission also discussed invasive species management on the site and the proposed methods to address them. Public Comment Attorney George Schober, Enfield, spoke on behalf of his client Peter Voskowsky, who is an abutting property owner. He also introduced Steve Trinkaus, Professional Engineer. He explained his client is concerned with the potential for effluent to seep onto his property and submitted a petition for intervention, stating they are able to cross examine and rebut what is presented. A letter from S. Trinkaus was also provided. Attorney Schober raised concerns regarding feasible and prudent alternatives S. Trinkaus provided information about his background and expertise. He noted two major issues with the subject application, the septic system and the stormwater system. It was stated that with a site like this, there is fast moving water through the gravel, so it takes a large distance for bacteria and viruses in the effluent to die off. According to his calculations, it was stated it results in 35 milligrams per liter, over three times the recommended 10 milligrams per liter. He stated his calculations also show a distance of 332 feet are needed but the system is 54 feet from the road, so it is his opinion there will be groundwater pollution. For the stormwater system, the proposed system will not remove nitrogen, and it will run downhill, entering the wetland boundary. He further explained the necessary process to remove nitrogen and then discussed concerns regarding surface treatment during the winter months and potential pollutants. There is not enough data to determine groundwater levels and direction of flow. Peter Voskowsky, 53 Windmill Drive, is an abutting property owner and discussed the site conditions of his property at 39R Hartford Avenue, including existing seeps, wetland characteristics, high groundwater levels, etc. K. Bednaz requested that the applicant consult with NDDB due to the proximity of the proposed development to existing habitats and provided clarification regarding the septic
Page 6
4 design and difficulties/feasibility of connecting to public sewer. She noted that the adjacent properties are functioning properly off septic systems and surrounding wetlands are healthy. Reinhard Maier, 138 Day Street, questioned the design of the proposed septic and leaching system, stating comparisons between the prior Vessel application and what is currently proposed. Robert Flanigan, 24 Woodcliff Drive, expressed concerns regarding potential wetlands contamination on the abutting property and questioned the connection to public sewer. R. Li requested a continuance of the public hearing to the next regular meeting on September 9, 2026. ON A MOTION by B. Schmitt, seconded by N. Dethlefsen, the Commission voted 5-0-0 to continue the public hearing to the next regular meeting. ON A MOTION by B. Schmitt, seconded by N. Dethlefsen, the Commission voted 5-0-0 to take a 5-minute recess at 9:10 p.m. 6. Show Cause Hearing a. 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a Regulated Activity without a valid IWWC Permit. Property owner Colleen Fontaine was present to provide updates and noted that a site walk with K. Bednaz was conducted on 8/7/26 to verify that the required plantings from the prior Enforcement Order were installed and surviving. At this time, the owners are working with TJ Barresi to develop a mitigation plan that will address drainage concerns while maintaining the wetlands resource area. The Enforcement Order was upheld and continued to the next regular meeting. 7. Agent Report and Correspondence a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated Activity without a valid IWWC Permit. Soil Scientist David Lord was present to discuss the wetlands delineation and noted that the limits of the wetland delineation relative to the proposed pond has been the focus of his efforts to this point. The wetland delineation of the corridor where the pond is proposed extends from the northern boundary to the southern boundary. He provided an overview of the delineation, soil types, flagged locations, etc. The property owner is looking to create a 2.5-acre pond with surrounding pasture areas for livestock. Two small wetlands along the northern property boundary off case street were identified; however not flagged, as there are no proposed activities within that area. K. Bednaz had concerns regarding pre-existing conditions, as no delineation or mapping has been provided to indicate site conditions prior to site disturbance by the property owner. At this point, the Commission has not received the necessary documentation as outlined within the Enforcement Order, and majority of focus has been placed on the pond/dam area.
Page 7
5 A mitigation plan must be provided for the area beyond the pond, as the remainder of the site has not been addressed. It was also noted that legal council will be sought if no progress is made. K. Bednaz stated that an existing conditions plan shall be submitted within the next two weeks, detailing impact areas, what materials will be removed and/or deposited, corrective measures and timeline, handling of slash, etc. Property owner Matt Reale questioned the keeping of livestock within a wetland area, to which staff stated her opinion that cows should be located outside of any wetland resource area. K. Bednaz also stated that the proposed farming activities are a separate matter, and the Enforcement Order needs to be addressed first. M. Reale requested clarification on the items outlined within the Enforcement Order and indicated that working with NRCS has made his project more stringent. b. 55 Northwoods Road – M. Fusick – Permit request to construct a 32’ x 24’ detached garage with underground electrical within a regulated area. Authorized Agent approval 07.16.26 c. 17 Farmview Lane – S. Bernabucci c/o Juliano’s Pools – Permit request to install an 18’ x 36’ inground swimming pool inclusive of patio and associated site improvements within a regulated area. Authorized Agent approval 07.17.26 d. 13 & 14 Evangeline Place – Town of Granby – Permit request to install a storm drainage system as part of re-paving project. Authorized Agent approval 07.21.26 K. Bednaz stated that she conducted a site visit at the Station 280 Apartment Complex to confirm the location of the excess scheduled plantings to the area where trash debris has been an issue. 8. Commissioner Reports and Correspondence None 9. Other Correspondence None 10. Adjourn ON A MOTION by F. Jones seconded by N. Dethlefsen, the Commission voted 5-0-0 to adjourn the meeting at 9:51p.m. Respectfully submitted, Renee Deltenre Land Use Coordinator
Page 8
Page 9
Environmental Engineering Program 410 Capitol Ave. P.O. Box 340308, MS #12SEW Hartford, CT 06134 DPH.EnvironEng@ct.gov ct.gov/dph Department of Public Health Regulatory Affairs Branch September 2, 2026 Kristin Kula, RS Farmington Valley Health District (FVHD) 95 River Road, Suite C Canton, CT 06019 RE: 37 Hartford Avenue - Granby, CT Dear Mrs. Kula: We have received plans for the installation of subsurface sewage disposal system (SSDS) at 37 Hartford Avenue in Granby, CT. The SSDS shall serve a 29-bedroom residential apartment building with a proposed daily design flow of 3,700 GPD. Plans were prepared by Rebecca Li, P.E. and submitted to our office for review pursuant to Section 19-13- B103(d)(c) of the Public Health Code (PHC). Plans are dated June 11, 2026, and bear a revision date of August 27, 2026. Plans were found to be in compliance with the requirements of Sections 19-13 B103d(c)(1)- (3) of the RCSA. Plans are APPROVED by this office pursuant to Section 19-13-B103e(f)(3) of the RCSA and the local director of health may issue an approval to construct pursuant to Section 19-13-B103e(f)(1) of the RCSA. The applicant is reminded that the Technical Standards requires compliance. If you have any questions or concerns, please contact sean.merrigan@ct.gov. Sincerely, Jenna Nicol Environmental Health Section Chief Regulatory Affairs Branch Department of Public Health cc: Director of Health, Building Official
Page 10
E HARTFORD AVE PROPOSED RESIDENTIAL BUILDING EXISTING DRIVEWAY HARTFORD AVE SEPTIC DESIGN PLAN REV. RLA PROJ. NUMBER: DRAWING# OF MASSACHUSETTS STATE LAW THIS DOCUMENT IS A VIOLATION UNAUTHORIZED ALTERATION OF DATE: ISSUANCE DATE: REVISIONS: PREPARED FOR: ph: 413.568.0985 fax: 413.568.0986 rlaland.com Westfield, MA 01085 R L A 40 School Street SCALE: S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg Landscape Architects Civil Engineers · Land Surveyors Environmental Consultants R LEVESQUEASSOCIATES INC 37 Hartford Avenue Granby, CT 06035 Parcel ID: 4254 DRAFTED BY: As Noted R.E.L. May 28, 2026 Mr. Forrest Devine 129 Lovers Lane Granville, MA 01034 251219 PERMITTING NOT FOR CONSTRUCTION C-8 B PERC TEST #2 DATA SEPTIC SYSTEM PROFILE NO SCALE PERC TEST #1 DATA DISTRIBUTION BOX DETAIL NO SCALE ≥ ≥ ≥ ≥ GEOMATRIX GST6236 LEACHING SYSTEM - SECTION A-A' GEOMATRIX GST6236 LEACHING SYSTEM - PLAN VIEW ≥ ≥ ≥ GEOMATRIX GST6236 LEACHING SYSTEM - SECTION B-B' GEOMATRIX GST LEACHING SYSTEM - INSPECTION PORT June 11, 2026 SUBSURFACE SEWAGE DISPOSAL SYSTEM PLAN LOCUS MAP SCALE 1"=1000' A. CT Public Health Dept. comments 8/4/26 B. CT Public Health Dept. comments 8/27/26 BORING B-2 DATA SHEET EXCERPT FROM GEOTECHNICAL REPORT PREPARED BY GEI CONSULTANTS
Page 11
1
Trinkaus Engineering, LLC
114 Hunters Ridge Road
Southbury, Connecticut 06488
203-264-4558 (office)
+1-203-525-5153 (mobile)
E-mail: strinkaus@earthlink.net
http://www.trinkausengineering.com
August 10, 2026, Revised to 9/3/26
Mr. John Laudati, Chairman
Inland Wetlands and Watercourses Commission
15 North Granby Road
Granby, Connecticut 06035
Re: 8-30g Application
37 Hartford Avenue
Granby, Connecticut
Dear Mr. Laudati and Members of the Inland Wetlands and Watercourses Commission,
At the request of Peter Voskowsky, I have reviewed the submitted information (August 4
to 25, 3026) for the above referenced project and have the following comments for your
consideration.
Executive Summary:
A. The sewage disposal system as proposed does not comply with environmental
requirements for nitrogen and bacteria and viruses. Comment has not been addressed.
B. No groundwater monitoring was done on the site to determine the depth and direction of
the groundwater table on the site. This is critical information to know to be able to
assess additional environmental impacts on the downgradient wetland area. Response
provided, but did not address the comment.
C. The proposed stormwater management system will result in soluble non-point source
pollutants being discharged into the groundwater table and ultimately reaching the
downgradient wetland area. Comment has not been addressed.
Sewage Disposal System:
1. In this proposal, the proposed on-site sewage disposal system is located between the
proposed building and Hartford Avenue. It has been designed to handle 3,700 gallons
per day (gpd) of effluent. As the soils on the site consists of coarse sand and gravel,
effluent will move quickly through the soil while not providing a high degree of
treatment of the effluent. The response by the applicant does not address the lack of
effluent treatment in the coarse grained sand and gravel soils.
2. No groundwater monitoring has been done to determine the depth and direction of the
groundwater on the site. In coarse sand and gravel soils, the groundwater does not
always follow the topographic slope of the ground surface. This is critical information to
Page 12
2 know to fully assess environmental impacts of the proposed sewage disposal system. Comment addressed. 3. The CT DEEP criteria for nitrogen dilution and 21-day travel time for bacteria and viruses have not been evaluated for the proposed system. This is a requirement as the State Department of Public Health is taking over jurisdiction of sewage disposal systems up to 11,000 gpd. While the State Health Department does not require the nitrogen analysis and bacteria travel time, these analyses can be requested by a local land use agency to assess the long term environmental impact of a sewage disposal system. Comment not addressed. 4. Using the applicant’s data and the protocol of the CT DEEP, I have performed these calculations and the results are below: a. The CT DEEP goal and soon to be under the jurisdiction of the State Health Department is to have a nitrogen concentration of 10 mg/l at a wetland boundary or property line. i. The nitrogen concentration entering a septic tank is 65 mg/l, it is reduced by 40% when it leaves the septic tank, so a nitrogen concentration of 39 mg/l is directed to the leaching fields. ii. The area allowed to be considered for dilution is only the area above, over or below the leaching fields to the point of concern. It this case, the point of concern is the property line along Hartford Avenue. According to the plans, only 0.227 acres are available for use in the nitrogen dilution calculation. iii. Using this data and the CT DEEP protocol, the nitrogen concentration will be 34.8 mg/l which is more than three times what is permitted. iv. Without knowing the depth and direction of the groundwater table on this site, this nitrogen could also be moving toward the wetland system at the rear of the site. The applicant used the entire site area for the nitrogen analysis to get less than 10 mg/l. To properly do the nitrogen analysis only the area uphill, over and downhill of the system to the point of concern (in this case the property line along Hartford Avenue) can be used to determine the nitrogen concentration which is three times the 10 mg/l cited by the applicant. b. The purpose of the 21-day travel time for bacteria and viruses is to determine the distance downgradient of the leaching system where the bacteria and viruses will naturally die off within the soil profile. i. No permeability tests were done in the proposed leaching system. On the prior application, where the leaching system was proposed in the rear of the building, two permeability tests were done. The tests yielded permeability rates of 111.6 “/hour (223.3 ft/day) and 138.5 “/hour (277 ft/day) which are typical for coarse sand and gravel soils. ii. In calculating the distance for the 21-day travel time, the higher permeability rate is used as it will yield the worst case scenario. iii. Using the permeability rate of 277 ft/day, a ground slope of 2.0%, the distance for the 21-day travel time for the die off of bacteria and viruses will be 332 feet. The plan provides only 54’ to the property line, so this environmental criteria has not been met. See response to #3 above.
Page 13
3 Stormwater Management: 5. The stormwater management system consists of an underground infiltration system consisting of StormTech SC-800 units surrounded by crushed stone with an Isolator Row. An online hydrodynamic separator is proposed prior to the underground system. 6. It is stated on the plan that two test pits shall be dug in the vicinity of the underground system to confirm soil conditions. This work needs to be done prior to any land use approval, not after the fact. Any soil testing needs to be witnessed by the Granby Town Engineer. Soil testing needs to be done prior to a decision being made by any land use agency to confirm the design of the system is appropriate. 7. According to the detail of the Inlet Control Structure (PICS-1), a weir wall is proposed to direct runoff to the Isolator Row. A note on the plan states that the top of the weir wall just be 6” above the invert of the 24” pipe to the Isolator Row. As the invert of the 24” pipe is 95.00’, this would make the top of the weir wall 195.50’. This is 0.26’ higher than the invert of the inlet pipe entering this structure and will cause a backwater condition in the inlet pipe which is not sound engineering. Comment addressed. 8. Building roof drains are directly connected to the underground system with no treatment of the runoff. It is well documented in professional literature that up to 40% of annual nitrogen and phosphorous loads are the result of atmospheric deposition on impervious surfaces. Runoff from a single family house is relatively clean, but larger roofs areas for apartments or commercial buildings is not clean. Roof runoff must be treated due to the amount of nutrients which can be deposited on the roof by atmospheric deposition. 9. The CT DEEP requires that TSS is reduced by 80%, TP by 50%, and TN by 30% as this is a redevelopment site. While the TSS standard can be met with the Isolator Row, the TP and TN reductions will not be met by any component of the stormwater management system and thus will be discharged to the groundwater table and will ultimately reach the wetlands at the bottom of the slope. Providing a storage volume for runoff does not equate to treatment. The line is the 2024 Storm Water Quality Manual is not supported by evidence. DEEP requires the reduction of pollutant loads above and the proposed system does not meet these criteria. 10. As there is minimal use of sand during winter snow operations with liquid deicing agents being used instead, the pollutants of concern will remain in a soluble state as there is no particulate material for the pollutants to bind onto. Pollutants in a soluble state will move extremely quickly through the coarse sand and gravel on this site and not be treated at all by the coarse native soil. The soluble pollutants will ultimately reach the downgradient wetlands. Filtration through organic sandy or silty loam soils will reduce nutrient loads, however, coarse grained sand and gravels do not provide any treatment as there is no organic component to these soils and the runoff moves quickly through them providing no treatment. 11. Based upon the plan, the underground stormwater system is approximately 144’ from the wetland boundary. Based upon the previous permeability testing done in this area, stormwater in the infiltration system will reach the wetland boundary between 12.5 and 15.5 hours after entering the system with the soluble pollutants being discharged to the groundwater or wetlands on the site. Comment has not been addressed. Soluble pollutants will quickly travel through the coarse grained sand and gravels with no
Page 14
4 treatment and be discharged via groundwater into the wetland system as the bottom of the slope. 12. It is stated on page 2-6 of the stormwater report that deep sump catch basins with hooded outlets will be used on the site. The detail of the catch basin shown on Sheet D-4 shows the bottom of the hood being equal to the outlet invert of the pipe. This design will not trap oils and grease within the catch basin. Comment addressed. 13. It is stated on page 3-10 of the stormwater report that the use of non-structural LID systems was limited on the site. As an expert in the field of Low Impact Development, this statement is not correct. The proposed development plan could have been modified to implement LID strategies on this site. Comment not addressed. Stormwater system does not use environmentally sound LID systems to reduce non-point source pollutants. 14. It is also stated that by holding the Water Quality Volume in the underground system, Standard #1 of the CT DEEP Storm Water Quality Manual has been met. This statement is not factually correct as simply providing and/or infiltrating the Water Quality Volume does NOT equate to treatment for the reasons discussed above. Comment not addressed. The applicant should explain with calculations how soluble pollutants will be reduced by the system instead of simply citing a book which provides no scientific explanation how providing a volume equates to treatment. 15. The calculation of the Water Quality Volume uses the entire site area. This is not correct as most of the site is NOT tributary to the stormwater management system. The Water Quality Volume calculation needs to be revised to only include those areas tributary to the stormwater system. Comment not addressed. If only the tributary area to the treatment system was used, the impervious area would be a higher percentage of the land area which would affect the determination of the Water Quality Volume. 16. It is also stated that the provided storage volume will exceed the required Water Quality Volume, thus the pollutant load reductions required by CT DEEP will be met. This statement is not supported by science and field monitoring of stormwater management systems. See response #14 above. 17. The applicant claims that since they are containing the water quality volume in the multiple stormwater systems, the pollutant loads are magically reduced as the following language from the CT DEEP 2024 Storm Water Quality Manual seems to imply: “Achieving these minimum required load reductions for sediment and nutrients is assumed to provide adequate reductions of other stormwater pollutants including floatable materials. However, it is important to note that if the full retention goal (i.e., Required Retention Volume) is met, then it is assumed pollutant reduction is also achieved and individual pollutant calculations are not necessary.” 18. The above statement is not supported by science for the following reasons: Assumed is not an engineering term. No evidence is found in the 2024 Manual to support the above statement. a. Treatment Processes: Effective removal relies on specific physical, chemical, and biological processes occurring within the practice, such as sedimentation, filtration, adsorption, and microbial action. Holding the water simply provides the opportunity for these processes to work. b. Design and Maintenance: The specific design of the practice (e.g., detention pond, rain garden, permeable pavement) and its ongoing maintenance are vital for
Page 15
5
ensuring these processes function correctly. Clogged systems or short-circuiting
flow paths can drastically reduce efficiency, even if the total volume is captured.
c. Pollutant Characteristics: Different pollutants behave differently. Suspended
solids often settle out well, while dissolved nutrients (like nitrogen and
phosphorus) or certain chemicals might require specialized treatment components
or longer retention times for effective removal.
d. Storm Dynamics: The WQV is typically designed for a specific "design storm"
(e.g., the first flush or a 90% storm event) [1]. Larger or more intense storms may
overwhelm the system, resulting in bypass or reduced treatment efficiency for the
excess volume.
e. Many stormwater practices found in the 2024 CT DEEP Storm Water Quality
Manual are incapable of providing the high level of reduction required. As an
example, a Dry Detention Basin is rated by CT DEEP to have Moderate TSS
removal and low TP and TP removal, so it does not matter how much water is
held in a Dry Detention Basin, the required pollutant load reductions will never be
met as the system cannot provide them.
19. Because of the extremely fast permeability rates in the underground stormwater system, a
pollutant loading analysis must be done to demonstrate that non-point source pollutants
will be reduced prior to introduction to the underground stormwater system as no
additional will occur in the coarse sandy soils. Comment not addressed.
20. In the routing analyses for the underground stormwater system, the applicant is using an
infiltration rate of 8.27”/hour which is a Rawls rate for Sand. Rawl’s rates were
developed in 1982 and are national average of infiltration rates for various soil types.
The Rawl’s rates were determined as follows:
a. Literature Survey: The researchers compiled a massive set of measured soil
characteristics from across the United States, looking at parameters like particle-
size distribution (percentages of sand, silt, and clay), bulk density, and porosity.
b. Textural Grouping: They sorted the collected field and laboratory data into the 11
standard USDA soil textural classes (ranging from sand down to clay).
c. Statistical Averaging: For each textural class, average values for hydraulic
properties—including bubbling pressure, pore-size distribution index (λ), and
saturated hydraulic conductivity (\(K_{s}\))—were computed using statistical
regression and data fitting.
d. Rawl’s rates are not direct field infiltration test measurements. If field
infiltration rates are reduced by 50%, then the Rawl’s rates should also be
reduced by 50% to provide a factor of safety in the design. This is sound
engineering practice.
21. It is required under the CT DEEP 2024 Storm Water Quality Manual that only 50% of the
Rawl’s rate be used in the hydrologic modeling of an infiltration practice when using the
Static sizing method. See response to #20 above.
22. A reserve/secondary snow storage area has been added to the south of the pavilion at the
end of the parking aisle. According to Sheet C-4, the pavilion will have a roof so there is
no access to the secondary snow storage area. The two areas shown for snow storage are
too small for any meaningful stockpiling of snow. Thus, the snow management plan is
ineffective. On Sheet C-4, a sidewalk is shown on the southwest side of the pavilion.
The sidewalk prevents access to the snow storage area behind the pavilion. If snow Page 16
6
is plowed to the front of the pavilion, there will be no access to the rear snow storage
area.
Please contact my office if you have any questions concerning this information.
Respectfully submitted,
Trinkaus Engineering, LLC
Steven D. Trinkaus, PE
Page 17
Kevin Clark, PEL Town Engineer Town of Granby 15 North Granby Road Granby, CT 06035 CT: (860) 844-5318 E-MAIL: townengineer@granby-ct.gov Page 1 of 1 Plan Review August 31, 2026 “Site Plans, Residential Development, 37 Hartford Avenue – Granby, CT 06035, Mr. Forest Dvine, 129 Lovers Lane, Granville, MA 01034, by R Levesque Associates, Inc., Francis Real Estate Holdings, Scale: 1”=30’, Date: May 27, 2026, Revised August 25, 2026.” “Response to Peer Review Comments, August 25, 2026.” Comments: Peer Review Comment 7: The applicant ’s engineer made one minor revision to the invert of the stormwater management system at PICS -1. This change will have little impact on the operation of the system and will have no adverse impact on the same. by: Kevin Clark, PEL, Town Engineer
Page 18
R LEVESQUE ASSOCIATES, INC. 40 School Street, P.O. BOX 640, Westfield, MA 01085 p 413.568.0985 · f 413.568.0986 · www.rlaland.com A L AND PL ANNING SERVICES COMPANY August 25, 2026 Via email: wetlandsagent@granby-ct.gov John L. Laudati, Chairman Town of Granby Inland Wetlands & Watercourses Commission 15 North Granby Road Granby, Connecticut 06035 RE: Response to Peer Review Comments 37 Hartford Avenue Granby, Connecticut 06035 (Parcel ID: 4254) RLA Project File No. 251219 Dear Chairman Laudati: On behalf of the Applicant, Forrest Devine, R Levesque Associates, Inc. (RLA) is pleased to provide the following responses to the peer review comments issued by Trinkaus Engineering, LLC for the above-referenced project. RLA appreciates the independent professional engineering review and the opportunity to address the comments provided. For clarity and ease of review, each peer review comment is reproduced below in italicized text, followed immediately by the corresponding RLA Response in blue, boldface text. Comment numbering and organization have been maintained consistent with the original Trinkaus Engineering, LLC peer review document. Sewage Disposal System: 1. In this proposal, the proposed on-site sewage disposal system is located between the proposed building and Hartford Avenue. It has been designed to handle 3,700 gallons per day (gpd) of effluent. As the soils on the site consists of coarse sand and gravel, effluent will move quickly through the soil while not providing a high degree of treatment of the effluent. RLA Response: Based on test pits conducted by certified soil scientist, Ryan Nelson from RLA, the soil conditions within the vicinity of the proposed subsurface sewage disposal system (SSDS) showed evidence of loamy sand materials within the A & B soil horizons and coarse sand material within the C soil horizon. Additionally, percolation tests were conducted in two (2) of the four (4) test pits located within the vicinity of the proposed
Page 19
R LEVESQUE ASSOCIATES, INC. 40 School Street, P.O. BOX 640, Westfield, MA 01085 p 413.568.0985 · f 413.568.0986 · www.rlaland.com A L AND PL ANNING SERVICES COMPANY septic system as required by the Connecticut Public Health Code. The results of these tests were utilized in the design of the SSDS to determine the effective leaching area. The proposed SSDS utilizes the design criteria set forth in the Connecticut Public Health Code: On-Site Sewage Disposal Regulations and Technical Standards for Subsurface Sewage Disposal Systems 2024. 2. No groundwater monitoring has been done to determine the depth and direction of the groundwater on the site. In coarse sand and gravel soils, the groundwater does not always follow the topographic slope of the ground surface. This is critical information to know to fully assess environmental impacts of the proposed sewage disposal system. RLA Response: RLA has coordinated with the Local Health District and the Connecticut Department of Public Health (CT DPH) regarding the proposed septic system. Both agencies have reviewed the design plans and provided comments, which have been incorporated into the revised plans issued on August 4, 2026. No relief is being sought for groundwater separation. The proposed SSDS complies with applicable Connecticut Public Health Code requirements. Four test pits conducted by RLA identified no groundwater or evidence of groundwater to depths of 8.33 feet below grade. In addition, the 2023 GEI investigation documented two monitoring wells and three borings with no groundwater encountered to depths of 22 feet below grade. Based on these investigations, there is no evidence of groundwater within the proposed SSDS area that would affect the design or required groundwater separation. 3. The CT DEEP criteria for nitrogen dilution and 21-day travel time for bacteria and viruses have not been evaluated for the proposed system. This is a requirement as the State Department of Public Health is taking over jurisdiction of sewage disposal systems up to 11,000 gpd. RLA Response: RLA has coordinated with the Local Health District and the Connecticut Department of Public Health (CT DPH) regarding the proposed septic system. Both agencies have reviewed the design plans and provided comments, which have been incorporated into the revised plans issued on August 4, 2026. Based on the proposed design flow of less than 5,000 gallons per day (gpd), the project does not trigger the CT DEEP requirements for a nitrogen dilution assessment or evaluation of a 21-day travel time for bacteria and viruses. Accordingly, these assessments are not required for the proposed system.
Page 20
R LEVESQUE ASSOCIATES, INC. 40 School Street, P.O. BOX 640, Westfield, MA 01085 p 413.568.0985 · f 413.568.0986 · www.rlaland.com A L AND PL ANNING SERVICES COMPANY 4. Using the applicant’s data and the protocol of the CT DEEP, I have performed these calculations and the results are below: a. The CT DEEP goal and soon to be under the jurisdiction of the State Health Department is to have a nitrogen concentration of 10 mg/l at a wetland boundary or property line. The nitrogen concentration entering a septic tank is 65 mg/l, it is reduced by 40% when it leaves the septic tank, so a nitrogen concentration of 39 mg/l is directed to the leaching fields. i. The area allowed to be considered for dilution is only the area above, over or below the leaching fields to the point of concern. It this case, the point of concern is the property line along Hartford Avenue. According to the plans, only 0.227 acres are available for use in the nitrogen dilution calculation. ii. Using this data and the CT DEEP protocol, the nitrogen concentration will be 34.8 mg/l which is more than three times what is permitted. iii. Without knowing the depth and direction of the groundwater table on this site, this nitrogen could also be moving toward the wetland system at the rear of the site. RLA Response: RLA has coordinated with the Local Health District and the Connecticut Department of Public Health (CT DPH) regarding the proposed septic system. Both agencies have reviewed the design plans and provided comments, which have been incorporated into the revised plans issued on August 4, 2026. Based on RLA’s review of the applicable Connecticut Department of Public Health (CT DPH) Technical Standards and current CT DEEP requirements, the proposed 3,700 gpd conventional SSDS is subject to the applicable CT DPH/local health department review and approval requirements. There is no provision within the applicable DPH Technical Standards that requires a CT DEEP nitrogen dilution analysis. Notwithstanding the above, and acknowledging the Commission’s concerns regarding potential nitrogen impacts to the wetland resources associated with previously proposed projects in the area, RLA has completed a simplified nitrogen assessment using the methodology identified in the 2026 CT DPH Technical Standards. The assessment was provided to further evaluate the potential nitrogen impacts associated with the proposed SSDS. Based on the site-specific assumptions and data used in the assessment, the resulting nitrogen concentration is less than the 10 mg/L drinking water
Page 21
R LEVESQUE ASSOCIATES, INC. 40 School Street, P.O. BOX 640, Westfield, MA 01085 p 413.568.0985 · f 413.568.0986 · www.rlaland.com A L AND PL ANNING SERVICES COMPANY standard as demonstrated in the previously submitted calculation. b. The purpose of the 21-day travel time for bacteria and viruses is to determine the distance downgradient of the leaching system where the bacteria and viruses will naturally die off within the soil profile. i. No permeability tests were done in the proposed leaching system. On the prior application, where the leaching system was proposed in the rear of the building, two permeability tests were done. The tests yielded permeability rates of 111.6 “/hour (223.3 ft/day) and 138.5 “/hour (277 ft/day) which are typical for coarse sand and gravel soils. ii. In calculating the distance for the 21-day travel time, the higher permeability rate is used as it will yield the worst case scenario. iii. Using the permeability rate of 277 ft/day, a ground slope of 2.0%, the distance for the 21-day travel time for the die off of bacteria and viruses will be 332 feet. The plan provides only 54’ to the property line, so this environmental criteria has not been met. RLA Response: RLA has coordinated with the Local Health District and the Connecticut Department of Public Health (CT DPH) regarding the proposed septic system. Both agencies have reviewed the design plans and provided comments, which have been incorporated into the revised plans issued on August 4, 2026. Stormwater Management: 5. The stormwater management system consists of an underground infiltration system consisting of StormTech SC-800 units surrounded by crushed stone with an Isolator Row. An online hydrodynamic separator is proposed prior to the underground system. RLA Response: Acknowledged, no response necessary. 6. It is stated on the plan that two test pits shall be dug in the vicinity of the underground system to confirm soil conditions. This work needs to be done prior to any land use approval, not after the fact. Any soil testing needs to be witnessed by the Granby Town Engineer. RLA Response: The stormwater management system design was developed based on the available subsurface information, including test pits conducted by RLA in support of the proposed SSDS and the subsurface investigation documented in the 2023 geotechnical report prepared by GEI Consultants, Inc. At least one of the GEI borings
Page 22
R LEVESQUE ASSOCIATES, INC. 40 School Street, P.O. BOX 640, Westfield, MA 01085 p 413.568.0985 · f 413.568.0986 · www.rlaland.com A L AND PL ANNING SERVICES COMPANY was located in close proximity to the proposed subsurface infiltration system. The available investigations indicate consistent subsurface soil conditions within the project area and provide a reasonable basis for the soil parameters used in the stormwater design. Additional test pits will be conducted within the vicinity of the proposed subsurface infiltration system prior to construction to confirm the anticipated subsurface conditions. RLA will coordinate with the Granby Town Engineer regarding the timing and witnessing of the additional test pits. 7. According to the detail of the Inlet Control Structure (PICS-1), a weir wall is proposed to direct runoff to the Isolator Row. A note on the plan states that the top of the weir wall just be 6” above the invert of the 24” pipe to the Isolator Row. As the invert of the 24” pipe is 95.00’, this would make the top of the weir wall 195.50’. This is 0.26’ higher than the invert of the inlet pipe entering this structure and will cause a backwater condition in the inlet pipe which is not sound engineering. RLA Response: The pipe invert elevations have been revised to prevent a backwater condition. 8. Building roof drains are directly connected to the underground system with no treatment of the runoff. It is well documented in professional literature that up to 40% of annual nitrogen and phosphorous loads are the result of atmospheric deposition on impervious surfaces. RLA Response: The proposed stormwater management system was designed in accordance with the CT DEEP Stormwater Quality Manual and reviewed by the Town of Granby Department of Public Works Town Engineer. The Manual does not require pretreatment for infiltration BMPs receiving clean roof runoff. Pretreatment is generally required for runoff from roads and parking areas due to the potential for higher pollutant loads. The stormwater management system was specifically designed to keep the roof runoff separate from the roadway/parking lot areas. Therefore, the proposed direct discharge of roof runoff to the infiltration system is consistent with CT DEEP requirements. 9. The CT DEEP requires that TSS is reduced by 80%, TP by 50%, and TN by 30% as this is a redevelopment site. While the TSS standard can be met with the Isolator Row, the TP and TN reductions will not be met by any component of the stormwater management system and thus will be discharged to the groundwater table and will ultimately reach the wetlands at the bottom of the slope.
Page 23
R LEVESQUE ASSOCIATES, INC. 40 School Street, P.O. BOX 640, Westfield, MA 01085 p 413.568.0985 · f 413.568.0986 · www.rlaland.com A L AND PL ANNING SERVICES COMPANY RLA Response: The proposed stormwater management system was designed in accordance with the CT DEEP Stormwater Quality Manual and reviewed by the Town of Granby Department of Public Works Town Engineer. Table 4-3 of the 2024 Connecticut Stormwater Quality Manual identifies minimum average annual pollutant load reduction targets for TSS, TP, and TN when evaluating BMP selection and sizing. As stated in Table 4-3 of the manual: “A proposed stormwater management system meets or exceeds these average annual pollutant load reductions when the Required Retention Volume is retained on-site using suitable stormwater retention practices.” The proposed subsurface infiltration basin is designed to retain the applicable Required Retention Volume in accordance with Standard 1. Therefore, additional treatment specifically for TP and TN is not required under the Manual, and the assertion that these pollutants will necessarily reach the groundwater or wetlands is not supported by the Manual. 10. As there is minimal use of sand during winter snow operations with liquid deicing agents being used instead, the pollutants of concern will remain in a soluble state as there is no particulate material for the pollutants to bind onto. Pollutants in a soluble state will move extremely quickly through the coarse sand and gravel on this site and not be treated at all by the coarse native soil. The soluble pollutants will ultimately reach the downgradient wetlands. RLA Response: The proposed stormwater management system was designed in accordance with the CT DEEP Stormwater Quality Manual and reviewed by the Town of Granby Department of Public Works Town Engineer. The assertion that soluble pollutants will “not be treated at all” by the proposed infiltration system is not consistent with the Connecticut Stormwater Quality Manual. The 2024 Connecticut Stormwater Quality Manual identifies infiltration BMPs as stormwater treatment practices that reduce pollutant loads through physical filtering, adsorption of pollutants onto soil particles, and subsequent biological and chemical processes within the soil profile. The Manual specifically identifies underground infiltration systems as providing pollutant removal. Furthermore, a snow management plan has been submitted in order to implement best snow management practices. Methods such as using anti-icing brine and hand shoveling pedestrian pathways first are some examples of methods that will be implemented to cut down on the total salt use. Additionally, signage will be added around the site indicating the designated snow storage areas.
Page 24
R LEVESQUE ASSOCIATES, INC. 40 School Street, P.O. BOX 640, Westfield, MA 01085 p 413.568.0985 · f 413.568.0986 · www.rlaland.com A L AND PL ANNING SERVICES COMPANY 11. Based upon the plan, the underground stormwater system is approximately 144’ from the wetland boundary. Based upon the previous permeability testing done in this area, stormwater in the infiltration system will reach the wetland boundary between 12.5 and 15.5 hours after entering the system with the soluble pollutants being discharged to the groundwater or wetlands on the site. RLA Response: The proposed stormwater management system was designed in accordance with the CT DEEP Stormwater Quality Manual and reviewed by the Town of Granby Department of Public Works Town Engineer. Table 10-3 of the 2024 Connecticut Stormwater Quality Manual establishes recommended minimum horizontal setback distances for stormwater infiltration systems from specified site features, including a 50- foot minimum setback from wetlands. The proposed subsurface infiltration basin is located approximately 144 feet from the wetland boundary, which exceeds the applicable 50-foot setback by approximately 94 feet. 12. It is stated on page 2-6 of the stormwater report that deep sump catch basins with hooded outlets will be used on the site. The detail of the catch basin shown on Sheet D- 4 shows the bottom of the hood being equal to the outlet invert of the pipe. This design will not trap oils and grease within the catch basin. RLA Response: The catch basin detail on Sheet D-4 has been revised to graphically extend the hood below the outlet pipe invert. 13. It is stated on page 3-10 of the stormwater report that the use of non-structural LID systems was limited on the site. As an expert in the field of Low Impact Development, this statement is not correct. The proposed development plan could have been modified to implement LID strategies on this site. RLA Response: The proposed stormwater management system has been designed in accordance with the CT DEEP Stormwater Quality Manual. Additionally, the proposed stormwater management design was reviewed and approved by the Town of Granby Department of Public Works Town Engineer. 14. It is also stated that by holding the Water Quality Volume in the underground system, Standard #1 of the CT DEEP Storm Water Quality Manual has been met. This statement is not factually correct. RLA Response: RLA respectfully disagrees with the comment. The statement that Standard 1 of the 2024 Connecticut Stormwater Quality Manual is satisfied by retaining the applicable Water Quality Volume (WQV) within the proposed underground
Page 25
R LEVESQUE ASSOCIATES, INC. 40 School Street, P.O. BOX 640, Westfield, MA 01085 p 413.568.0985 · f 413.568.0986 · www.rlaland.com A L AND PL ANNING SERVICES COMPANY infiltration system is consistent with the Manual's stated compliance methodology. Standard 1 establishes the requirement to retain the applicable Required Retention Volume (RRV) on-site through the use of appropriate stormwater retention practices. The proposed subsurface infiltration basin has been designed to retain the applicable WQV/RRV on-site. Accordingly, the proposed system satisfies the retention requirement established under Standard 1. Furthermore, the Manual's methodology provides that where the applicable RRV is fully retained on-site using suitable stormwater retention practices, additional treatment is not required. Therefore, the statement that the proposed system satisfies Standard 1 based upon retention of the applicable WQV/RRV is consistent with the 2024 Connecticut Stormwater Quality Manual. 15. The calculation of the Water Quality Volume uses the entire site area. This is not correct as most of the site is NOT tributary to the stormwater management system. RLA Response: The 2024 Connecticut Stormwater Quality Manual defines the area used in the Water Quality Volume (WQV) calculation as the post-development total drainage area of the site or design point. The WQV calculation was therefore based on the total post-development drainage area. While the calculation includes areas that are not directly tributary to the proposed stormwater management system, the use of the total drainage area is consistent with the Manual and represents a conservative approach. 16. It is also stated that the provided storage volume will exceed the required Water Quality Volume, thus the pollutant load reductions required by CT DEEP will be met. This statement is not supported by science and field monitoring of stormwater management systems. RLA Response: The project's stormwater management system has been designed to meet the Required Retention Volume by providing the Water Quality Volume (WQV) standards in accordance with Standard 1 of the 2024 Connecticut Stormwater Quality Manual. The Manual provides the regulatory basis for the relationship between achieving the Required Retention Volume and pollutant load reduction. Since the proposed system has been designed to meet the Required Retention Volume, the project is considered compliant with the pollutant load reduction requirements of Standard 1 pursuant to the Manual.
Page 26
R LEVESQUE ASSOCIATES, INC. 40 School Street, P.O. BOX 640, Westfield, MA 01085 p 413.568.0985 · f 413.568.0986 · www.rlaland.com A L AND PL ANNING SERVICES COMPANY 17. The applicant claims that since they are containing the water quality volume in the multiple stormwater systems, the pollutant loads are magically reduced as the following language from the CT DEEP 2024 Storm Water Quality Manual seems to imply: “Achieving these minimum required load reductions for sediment and nutrients is assumed to provide adequate reductions of other stormwater pollutants including floatable materials. However, it is important to note that if the full retention goal (i.e., Required Retention Volume) is met, then it is assumed pollutant reduction is also achieved and individual pollutant calculations are not necessary.” RLA Response: The quoted language is drawn directly from the adopted 2024 CT DEEP Stormwater Quality Manual and reflects the Department's own current regulatory compliance methodology — it is not the applicant's characterization or an assumption invented by the design team. This is the controlling and applicable compliance standard for this application. The project's stormwater management system has been designed to meet the Required Retention Volume in accordance with Standard 1 of the Manual, which the Manual itself states satisfy the associated pollutant load reduction goals. 18. The above statement is not supported by science for the following reasons: a. Treatment Processes: Effective removal relies on specific physical, chemical, and biological processes occurring within the practice, such as sedimentation, filtration, adsorption, and microbial action. Holding the water simply provides the opportunity for these processes to work. b. Design and Maintenance: The specific design of the practice (e.g., detention pond, rain garden, permeable pavement) and its ongoing maintenance are vital for ensuring these processes function correctly. Clogged systems or short- circuiting flow paths can drastically reduce efficiency, even if the total volume is captured. c. Pollutant Characteristics: Different pollutants behave differently. Suspended solids often settle out well, while dissolved nutrients (like nitrogen and phosphorus) or certain chemicals might require specialized treatment components or longer retention times for effective removal. d. Storm Dynamics: The WQV is typically designed for a specific "design storm" (e.g., the first flush or a 90% storm event) [1]. Larger or more intense storms may overwhelm the system, resulting in bypass or reduced treatment efficiency for the excess volume. e. Many stormwater practices found in the 2024 CT DEEP Storm Water Quality
Page 27
R LEVESQUE ASSOCIATES, INC.
40 School Street, P.O. BOX 640, Westfield, MA 01085
p 413.568.0985 · f 413.568.0986 · www.rlaland.com
A L AND PL ANNING SERVICES COMPANY
Manual are incapable of providing the high level of reduction required. As an
example, a Dry Detention Basin is rated by CT DEEP to have Moderate TSS removal
and low TP and TP removal, so it does not matter how much water is held in a Dry
Detention Basin, the required pollutant load reductions will never be met as the
system cannot provide them.
RLA Response: RLA does not dispute that reasonable engineering debate exists within
the profession regarding retention-based versus treatment-based stormwater
compliance pathways generally. That debate, however, is appropriately directed to CT
DEEP through the Manual's own periodic update process and is not a basis to impose
project-specific design requirements beyond what the currently adopted
Manual requires. The design team has followed the Department's current, adopted
standard.
19. Because of the extremely fast permeability rates in the underground stormwater system,
a pollutant loading analysis must be done to demonstrate that non-point source
pollutants will be reduced prior to introduction to the underground stormwater system
as no additional will occur in the coarse sandy soils.
RLA Response: See responses to Comments 9 and 17 above. The proposed stormwater
management system was designed in accordance with the CT DEEP Stormwater Quality
Manual and reviewed by the Town of Granby Department of Public Works Town
Engineer.
20. In the routing analyses for the underground stormwater system, the applicant is using an
infiltration rate of 8.27”/hour which is a Rawls rate for Sand. Rawl’s rates were
developed in 1982 and are national average of infiltration rates for various soil types.
The Rawl’s rates were determined as follows:
a. Literature Survey: The researchers compiled a massive set of measured soil
characteristics from across the United States, looking at parameters like particle-
size distribution (percentages of sand, silt, and clay), bulk density, and porosity.
b. Textural Grouping: They sorted the collected field and laboratory data into the 11
standard USDA soil textural classes (ranging from sand down to clay).
c. Statistical Averaging: For each textural class, average values for hydraulic
properties—including bubbling pressure, pore-size distribution index (λ), and
saturated hydraulic conductivity (\(K_{s}\))—were computed using statistical
regression and data fitting.
d. Rawl’s rates are not direct field infiltration test measurements. Page 28
R LEVESQUE ASSOCIATES, INC. 40 School Street, P.O. BOX 640, Westfield, MA 01085 p 413.568.0985 · f 413.568.0986 · www.rlaland.com A L AND PL ANNING SERVICES COMPANY RLA Response: See response to Comment 21 below. 21. It is required under the CT DEEP 2024 Storm Water Quality Manual that only 50% of the Rawl’s rate be used in the hydrologic modeling of an infiltration practice when using the Static sizing method. RLA Response: RLA disagrees; this comment misstates the Manual. Table 10-1 of the 2024 CT DEEP Stormwater Quality Manual expressly states: “Default infiltration rates (Table 10- 2) may be used when sizing infiltration systems in HSG A or B soils using the Static Method. The design infiltration rate should otherwise be equal to 50% of the slowest field measured infiltration rate.” The 50% reduction factor applies to field-measured infiltration rates — used in the Dynamic Method, or in the Static Method for HSG C/D soils — and does not apply to the Table 10-2 default (Rawls) rate of 8.27 in/hr for Sand (HSG A), which the Manual permits to be used at full value for Static Method sizing. The applicant's use of 8.27 in/hr without reduction is therefore consistent with the Manual. 22. A reserve/secondary snow storage area has been added to the south of the pavilion at the end of the parking aisle. According to Sheet C-4, the pavilion will have a roof so there is no access to the secondary snow storage area. The two areas shown for snow storage are too small for any meaningful stockpiling of snow. Thus, the snow management plan is ineffective. RLA Response: As described in the provided Snow Management Plan, the primary snow storage areas are located at either end of the drive aisles within the parking areas, with a secondary snow storage area provided to the southeastern side of the pavilion. Although the pavilion will have a roof, the secondary snow storage area will remain accessible from the parking area by a smaller off-road vehicle, such as an ATV or side- by-side. The curbing surrounding the parking areas is mountable, allowing snow removal equipment to access the designated storage areas. The designated snow storage areas are intended to accommodate routine snow stockpiling, while any snow accumulation exceeding the available storage capacity will be loaded and transported off-site to an approved snow disposal location. Accordingly, the proposed snow management plan provides designated areas for on- site snow storage, access for snow removal operations, and a contingency for the removal of excess snow from the site.
Page 29
R LEVESQUE ASSOCIATES, INC. 40 School Street, P.O. BOX 640, Westfield, MA 01085 p 413.568.0985 · f 413.568.0986 · www.rlaland.com A L AND PL ANNING SERVICES COMPANY Should you have any questions or comments regarding this information, please do not hesitate to contact our office at your earliest convenience. Sincerely, R LEVESQUE ASSOCIATES, INC. Rebecca Li, P.E.
Page 30
HARTFORD AVE WINDMILL DR. SHATTUCK AVE RUSHFORD MEADE BANK ST OAKRIDGE DR SITE BY Site Plans AS PREPARED FOR Proposed Residential Development May 28, 2026 RLA Project Number: 251219 129 Lovers Lane Granville, MA 01034 Mr. Forrest Devine 37 Hartford Avenue Granby, CT 06035 Parcel ID: 4254 40 School Street · Westfield, MA · 01085 ph 413.568.0985 · fax 413.568.0986 www.rlaland.com R LEVESQUE ASSOCIATES INC A LAND PLANNING SERVICES COMPANYR L A DRAWING INDEX SHEET NO. SHEET NAME ISSUE DATE REV. REV. DATE T-1 TITLE SHEET 5/28/26 REV. A 8/4/26 EX-1 EXISTING CONDITIONS PLAN 5/27/26 REV. A 7/24/26 C-1 NOTES, SYMBOL & LINE LEGEND, AND ABBREVIATIONS 5/28/26 REV. A 8/4/26 C-2 CONSTRUCTION NOTES 5/28/26 REV. A 8/4/26 C-3 DEMOLITION AND REMOVALS PLAN 5/28/26 REV. A 8/4/26 C-4 LAYOUT AND MATERIALS PLAN 5/28/26 REV. A 8/4/26 C-5 GRADING, EROSION & SEDIMENTATION CONTROL PLAN 5/28/26 REV. A 8/4/26 C-6 DRAINAGE AND UTILITIES PLAN 5/28/26 REV. B 8/25/26 C-7 LANDSCAPING PLAN 5/28/26 REV. B 8/25/26 C-8 SEPTIC DESIGN PLAN 6/11/26 REV. A 8/4/26 SL-1 PHOTOMETRIC PLAN 5/28/26 REV. A 8/4/26 SL-2 LIGHTING FIXTURE DETAILS 5/28/26 REV. A 8/4/26 D-1 DETAILS 5/28/26 REV. A 8/4/26 D-2 DETAILS 5/28/26 REV. A 8/4/26 D-3 DETAILS 5/28/26 REV. B 8/25/26 D-4 DETAILS 5/28/26 REV. A 8/25/26 D-5 DETAILS 5/28/26 REV. A 8/4/26 D-6 DETAILS 8/4/26 REV. A 8/25/26 PERMITTING NOT FOR CONSTRUCTION Rev.: August 25, 2026
Page 31
p p p p p p p p p p p p p p Hartford Avenue EXISTING FOUNDATION WALLS #41 #35 (CT - Route 189) p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p Limited Property/Boundary Survey REV. RLA PROJ. NUMBER: DRAWING# OF MASSACHUSETTS STATE LAW THIS DOCUMENT IS A VIOLATION UNAUTHORIZED ALTERATION OF DATE: ISSUANCE DATE: REVISIONS: PREPARED FOR: ph: 413.568.0985 fax: 413.568.0986 rlaland.com Westfield, MA 01085 R L A 40 School Street SCALE: S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - EXIST.dwg Landscape Architects Civil Engineers · Land Surveyors Environmental Consultants R LEVESQUEASSOCIATES INC DRAFTED BY: As Noted A.Z./J.L. TBM Elevation Added 251219 37 Hartford Avenue MLBU G-53/78/13 Granby, CT 06035 Forrest Devine 129 Lovers Lane Granville, MA 01034 06-11-26 05-27-26 Iron Pins To Be Set Added 07-22-26 EX-1 A ZONING REVIEW - Granby Center Zone Commerial Center (COCE) TYPE (MINIMUM) REQUIRED PROPOSED AREA 20,000 SQ FT - FRONTAGE 100 FT - DEPTH 150 FT - FRONT YARD 25 FT -- SIDE YARD 10 FT - REAR YARD 20 FT - HEIGHT (MAX) 3 STORIES (45 FT) - BUILDING COVERAGE (MAX) 30% - pppppp C.S.P.C.S. LOCUS MAP SCALE 1"=1000'
Page 32
NOTES, SYMBOL & LINE LEGEND AND ABBREVIATIONS REV. RLA PROJ. NUMBER: DRAWING# OF MASSACHUSETTS STATE LAW THIS DOCUMENT IS A VIOLATION UNAUTHORIZED ALTERATION OF DATE: ISSUANCE DATE: REVISIONS: PREPARED FOR: ph: 413.568.0985 fax: 413.568.0986 rlaland.com Westfield, MA 01085 R L A 40 School Street SCALE: S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE_recover.dwg Landscape Architects Civil Engineers · Land Surveyors Environmental Consultants R LEVESQUEASSOCIATES INC 37 Hartford Avenue Granby, CT 06035 Parcel ID: 4254 DRAFTED BY: As Noted R.E.L. May 28, 2026 Mr. Forrest Devine 129 Lovers Lane Granville, MA 01034 251219 PERMITTING NOT FOR CONSTRUCTION C-1 A X pppppp · · · · · · · · · · · · · · A. Town comments 8/4/26 · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · ·
Page 33
CONSTRUCTION NOTES REV. RLA PROJ. NUMBER: DRAWING# OF MASSACHUSETTS STATE LAW THIS DOCUMENT IS A VIOLATION UNAUTHORIZED ALTERATION OF DATE: ISSUANCE DATE: REVISIONS: PREPARED FOR: ph: 413.568.0985 fax: 413.568.0986 rlaland.com Westfield, MA 01085 R L A 40 School Street SCALE: S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE_recover.dwg Landscape Architects Civil Engineers · Land Surveyors Environmental Consultants R LEVESQUEASSOCIATES INC 37 Hartford Avenue Granby, CT 06035 Parcel ID: 4254 DRAFTED BY: As Noted R.E.L. May 28, 2026 Mr. Forrest Devine 129 Lovers Lane Granville, MA 01034 251219 PERMITTING NOT FOR CONSTRUCTION C-2 A A. Town comments 8/4/26
Page 34
p p p p p p p p p p p p p p Hartford Avenue EXISTING FOUNDATION WALLS #41 #35 (CT - Route 189) p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p DEMOLITION & REMOVALS PLAN REV. RLA PROJ. NUMBER: DRAWING# OF MASSACHUSETTS STATE LAW THIS DOCUMENT IS A VIOLATION UNAUTHORIZED ALTERATION OF DATE: ISSUANCE DATE: REVISIONS: PREPARED FOR: ph: 413.568.0985 fax: 413.568.0986 rlaland.com Westfield, MA 01085 R L A 40 School Street SCALE: S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE_recover.dwg Landscape Architects Civil Engineers · Land Surveyors Environmental Consultants R LEVESQUEASSOCIATES INC 37 Hartford Avenue Granby, CT 06035 Parcel ID: 4254 DRAFTED BY: As Noted R.E.L. May 28, 2026 Mr. Forrest Devine 129 Lovers Lane Granville, MA 01034 251219 PERMITTING NOT FOR CONSTRUCTION C-3 A A. Town comments 8/4/26
Page 35
p p p p p p p p p p p p p p Hartford Avenue (CT - Route 189) p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p 3-STORY RESIDENTIAL BUILDING ±5,447 S.F. PER STORY STOP LAYOUT & MATERIALS PLAN REV. RLA PROJ. NUMBER: DRAWING# OF MASSACHUSETTS STATE LAW THIS DOCUMENT IS A VIOLATION UNAUTHORIZED ALTERATION OF DATE: ISSUANCE DATE: REVISIONS: PREPARED FOR: ph: 413.568.0985 fax: 413.568.0986 rlaland.com Westfield, MA 01085 R L A 40 School Street SCALE: S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE_recover.dwg Landscape Architects Civil Engineers · Land Surveyors Environmental Consultants R LEVESQUEASSOCIATES INC 37 Hartford Avenue Granby, CT 06035 Parcel ID: 4254 DRAFTED BY: As Noted R.E.L. May 28, 2026 Mr. Forrest Devine 129 Lovers Lane Granville, MA 01034 251219 PERMITTING NOT FOR CONSTRUCTION C-4 A ZONING REVIEW - COMMERCIAL CENTER (COCE) TYPE (MINIMUM) REQUIRED EXISTING/PROPOSED LOT AREA 20,000 FT2 111,184± FT2 LOT FRONTAGE 100 FT 170± FT LOT DEPTH 150 FT 310± FT FRONT YARD 25 FT 88.6± FT SIDE YARD 10 FT 24.2± FT REAR YARD 20 FT 177.2± FT HEIGHT (MAX) 45 FT (3 STORIES) 3 STORIES LOT COVERAGE (MAX) 30% 22.3% LANDSCAPED AREA (MIN.) 20% 77.7% PARKING 31 32 *PARKING REQUIREMENTS: Multi-Family (2 bedrooms or more) - 2 spaces per unit Thirteen (13) 2-bedroom units x 2 spaces/unit = 26 spaces Multi-Family (1 bedroom) - 1.5 spaces per unit Three (3) 1-bedroom units x 2 spaces/unit = 5 spaces Total Required Parking Spaces = 31 spaces A. Town comments 8/4/26
Page 36
p p p p p p p p p p p p p p Hartford Avenue (CT - Route 189) p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p 3-STORY RESIDENTIAL BUILDING ±5,447 S.F. PER STORY FIRST STORY F.F.E.=202.00± SECOND STORY F.F.E=213.75± F.F.E.=202.50± GRADING, EROSION & SEDIMENTATION CONTROL PLAN REV. RLA PROJ. NUMBER: DRAWING# OF MASSACHUSETTS STATE LAW THIS DOCUMENT IS A VIOLATION UNAUTHORIZED ALTERATION OF DATE: ISSUANCE DATE: REVISIONS: PREPARED FOR: ph: 413.568.0985 fax: 413.568.0986 rlaland.com Westfield, MA 01085 R L A 40 School Street SCALE: S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg Landscape Architects Civil Engineers · Land Surveyors Environmental Consultants R LEVESQUEASSOCIATES INC 37 Hartford Avenue Granby, CT 06035 Parcel ID: 4254 DRAFTED BY: As Noted R.E.L. May 28, 2026 Mr. Forrest Devine 129 Lovers Lane Granville, MA 01034 251219 PERMITTING NOT FOR CONSTRUCTION C-5 A A. Town comments 8/4/26
Page 37
p p p p p p p p p p p p p p Hartford Avenue (CT - Route 189) p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p 3-STORY RESIDENTIAL BUILDING ±5,447 S.F. PER STORY E DRAINAGE & UTILITIES PLAN REV. RLA PROJ. NUMBER: DRAWING# OF MASSACHUSETTS STATE LAW THIS DOCUMENT IS A VIOLATION UNAUTHORIZED ALTERATION OF DATE: ISSUANCE DATE: REVISIONS: PREPARED FOR: ph: 413.568.0985 fax: 413.568.0986 rlaland.com Westfield, MA 01085 R L A 40 School Street SCALE: S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg Landscape Architects Civil Engineers · Land Surveyors Environmental Consultants R LEVESQUEASSOCIATES INC 37 Hartford Avenue Granby, CT 06035 Parcel ID: 4254 DRAFTED BY: As Noted R.E.L. May 28, 2026 Mr. Forrest Devine 129 Lovers Lane Granville, MA 01034 251219 PERMITTING NOT FOR CONSTRUCTION C-6 B A. Town comments 8/4/26 B. Drainage network revisions 8/25/26
Page 38
p p p p p p p p p p p p p p Hartford Avenue (CT - Route 189) p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p 3-STORY RESIDENTIAL BUILDING ±5,447 S.F. PER STORY E STOP SITE LANDSCAPING PLAN REV. RLA PROJ. NUMBER: DRAWING# OF MASSACHUSETTS STATE LAW THIS DOCUMENT IS A VIOLATION UNAUTHORIZED ALTERATION OF DATE: ISSUANCE DATE: REVISIONS: PREPARED FOR: ph: 413.568.0985 fax: 413.568.0986 rlaland.com Westfield, MA 01085 R L A 40 School Street SCALE: S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg Landscape Architects Civil Engineers · Land Surveyors Environmental Consultants R LEVESQUEASSOCIATES INC 37 Hartford Avenue Granby, CT 06035 Parcel ID: 4254 DRAFTED BY: As Noted R.E.L. May 28, 2026 Mr. Forrest Devine 129 Lovers Lane Granville, MA 01034 251219 PERMITTING NOT FOR CONSTRUCTION C-7 B A. Town comments 8/4/26 B. IWWA comments 8/25/26
Page 39
E HARTFORD AVE PROPOSED RESIDENTIAL BUILDING EXISTING DRIVEWAY HARTFORD AVE SEPTIC DESIGN PLAN REV. RLA PROJ. NUMBER: DRAWING# OF MASSACHUSETTS STATE LAW THIS DOCUMENT IS A VIOLATION UNAUTHORIZED ALTERATION OF DATE: ISSUANCE DATE: REVISIONS: PREPARED FOR: ph: 413.568.0985 fax: 413.568.0986 rlaland.com Westfield, MA 01085 R L A 40 School Street SCALE: S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg Landscape Architects Civil Engineers · Land Surveyors Environmental Consultants R LEVESQUEASSOCIATES INC 37 Hartford Avenue Granby, CT 06035 Parcel ID: 4254 DRAFTED BY: As Noted R.E.L. May 28, 2026 Mr. Forrest Devine 129 Lovers Lane Granville, MA 01034 251219 PERMITTING NOT FOR CONSTRUCTION C-8 A PERC TEST #2 DATA SEPTIC SYSTEM PROFILE NO SCALE PERC TEST #1 DATA DISTRIBUTION BOX DETAIL NO SCALE ≥ ≥ ≥ ≥ GEOMATRIX GST6236 LEACHING SYSTEM - SECTION A-A' GEOMATRIX GST6236 LEACHING SYSTEM - PLAN VIEW ≥ ≥ ≥ GEOMATRIX GST6236 LEACHING SYSTEM - SECTION B-B' GEOMATRIX GST LEACHING SYSTEM - INSPECTION PORT June 11, 2026 SUBSURFACE SEWAGE DISPOSAL SYSTEM PLAN LOCUS MAP SCALE 1"=1000' A. CT Public Health Dept. comments 8/4/26
Page 40
Luminaire ScheduleQtyLabel DescriptionTagLLF LuminaireLumens Luminaire Watts Total Watts 3S4W PROV2-36L-325-3K7-4W16 FTAG0.900381337.82113.46 1S5Q PROV2-36L-325-3K7-5Q16 FTAG0.900415837.8237.82 1S4 PROV2-36L-295-3K7-4W16 FTAG0.900350134.134.1 1WP4F BEACON: RWL1-48L-10-3K7-4F-UNV9' FTAG0.900123210.110.1 7WP4 BEACON: RWL1-48L-10-3K7-4W-U9' FTAG0.900128510.170.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.3 0.3 0.5 0.5 0.4 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.7 0.3 0.9 1.0 1.5 1.4 1.3 1.7 1.1 0.9 0.4 0.6 0.5 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 1.3 0.3 1.5 1.9 2.6 2.5 2.4 2.9 2.1 1.7 0.4 1.6 0.8 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 1.5 1.8 0.8 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 1.3 1.5 0.8 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.3 0.4 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.4 0.4 0.4 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 1.2 0.8 1.2 1.1 1.3 1.1 0.4 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.4 1.0 1.3 1.6 2.3 2.0 1.6 1.4 1.6 1.6 1.6 1.2 1.6 1.2 0.6 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.5 0.5 1.2 1.6 1.7 1.1 0.7 1.1 1.4 1.3 0.6 1.6 1.4 0.6 0.5 0.4 0.3 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.4 0.5 0.5 0.5 0.2 0.6 1.5 1.8 1.9 2.6 2.6 1.4 1.6 1.2 0.7 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.2 0.2 0.2 0.2 0.3 0.4 0.3 0.3 0.6 1.3 1.5 1.8 2.3 2.1 1.2 1.1 1.2 0.9 0.4 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.4 0.5 0.4 0.4 0.5 0.7 0.7 0.6 0.5 0.6 0.7 1.0 1.2 1.4 1.2 1.1 1.0 1.2 0.9 0.6 0.4 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.8 1.0 0.8 0.7 0.9 1.2 1.2 1.2 0.9 0.8 0.8 1.1 1.0 0.8 0.8 1.1 1.2 1.1 0.9 0.9 0.9 0.5 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.9 1.3 1.1 1.0 1.3 1.4 1.5 1.4 1.2 1.0 1.2 1.3 1.0 0.6 0.7 1.1 1.4 1.1 1.0 1.3 1.1 0.6 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.7 1.4 1.5 1.0 1.6 1.3 1.3 1.4 1.6 1.0 1.6 1.2 0.8 0.4 0.6 0.9 1.6 1.6 1.3 1.6 1.0 0.6 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.4 0.4 0.4 0.3 0.5 0.3 0.4 0.3 0.4 0.3 0.3 0.2 0.3 0.4 0.5 0.5 0.4 0.6 0.5 0.4 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.2 0.2 0.1 0.1 0.1 0.2 0.3 0.2 0.1 0.1 0.1 0.1 0.1 0.2 0.3 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.1 0.2 0.1 0.1 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Sheet 1 of 2 333 Pleasant Valley Road South Windsor, CT 06074 (860) 282-0597 263 Winn Street Burlington, MA 01803 (781) 935-8500 Drawing Number: Detail: Photometric Calculation Date: 07/27/2026 Revision:A Scale: 1"=20' Drawn By: MGS Project: 37 Hartford Ave Grandby, CT Sheet 1 of 2 SL-1
Page 41
333 Pleasant Valley Road South Windsor, CT 06074 (860) 282-0597 263 Winn Street Burlington, MA 01803 (781) 935-8500 Drawing Number: WP4/W4F - BEACON RATIO WALL S4W / S5Q - VIPER AREA Sheet 2 of 2 SL-2 Detail: Photometric Calculation Date: 07/27/2026 Revision:A Scale: 1"=20' Drawn By: MGS Project: 37 Hartford Ave Grandby, CT
Page 42
DETAILS REV. RLA PROJ. NUMBER: DRAWING# OF MASSACHUSETTS STATE LAW THIS DOCUMENT IS A VIOLATION UNAUTHORIZED ALTERATION OF DATE: ISSUANCE DATE: REVISIONS: PREPARED FOR: ph: 413.568.0985 fax: 413.568.0986 rlaland.com Westfield, MA 01085 R L A 40 School Street SCALE: S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE_recover.dwg Landscape Architects Civil Engineers · Land Surveyors Environmental Consultants R LEVESQUEASSOCIATES INC 37 Hartford Avenue Granby, CT 06035 Parcel ID: 4254 DRAFTED BY: As Noted R.E.L. May 28, 2026 Mr. Forrest Devine 129 Lovers Lane Granville, MA 01034 251219 PERMITTING NOT FOR CONSTRUCTION D-1 A SHRUB PLANTING DETAIL TREE PLANTING DETAIL ANTI-TRACKING APRON (AS REQ'D) A A REINFORCED CONCRETE SIDEWALK SECTION INLET PROTECTION - SEDIMENT FILTER SACK MONOLITHIC CONCRETE CURB & SIDEWALK BITUMINOUS CONCRETE PAVING DETAIL SLOPE PROTECTION MATERIAL INSTALLATION (AS REQ'D) 6" BITUMINOUS CONCRETE LIP CURBING HANDICAP PARKING STALL EROSION CONTROL LOG A. Town comments 8/4/26 STRAW BALE BARRIER
Page 43
DETAILS REV. RLA PROJ. NUMBER: DRAWING# OF MASSACHUSETTS STATE LAW THIS DOCUMENT IS A VIOLATION UNAUTHORIZED ALTERATION OF DATE: ISSUANCE DATE: REVISIONS: PREPARED FOR: ph: 413.568.0985 fax: 413.568.0986 rlaland.com Westfield, MA 01085 R L A 40 School Street SCALE: S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg Landscape Architects Civil Engineers · Land Surveyors Environmental Consultants R LEVESQUEASSOCIATES INC 37 Hartford Avenue Granby, CT 06035 Parcel ID: 4254 DRAFTED BY: As Noted R.E.L. May 28, 2026 Mr. Forrest Devine 129 Lovers Lane Granville, MA 01034 251219 PERMITTING NOT FOR CONSTRUCTION D-2 A TYPICAL SECTION - SEGMENTAL PRECAST CONCRETE RETAINING WALL LIGHT POLE INSTALLATION DETAIL DUMPSTER ENCLOSURE STEEL BOLLARD WITH SIGN DETAIL 6' STANDARD SINGLE SIDE WHEEL STOP A. Town comments 8/4/26 FENCEPOST TO RETAINING WALL ATTACHMENT • WOOD GUARDRAIL
Page 44
3-STORY RESIDENTIAL BUILDING ±5,447 S.F. PER STORY DETAILS REV. RLA PROJ. NUMBER: DRAWING# OF MASSACHUSETTS STATE LAW THIS DOCUMENT IS A VIOLATION UNAUTHORIZED ALTERATION OF DATE: ISSUANCE DATE: REVISIONS: PREPARED FOR: ph: 413.568.0985 fax: 413.568.0986 rlaland.com Westfield, MA 01085 R L A 40 School Street SCALE: S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg Landscape Architects Civil Engineers · Land Surveyors Environmental Consultants R LEVESQUEASSOCIATES INC 37 Hartford Avenue Granby, CT 06035 Parcel ID: 4254 DRAFTED BY: As Noted R.E.L. May 28, 2026 Mr. Forrest Devine 129 Lovers Lane Granville, MA 01034 251219 PERMITTING NOT FOR CONSTRUCTION D-3 B OUTLET CONTROL STRUCTURE (POCS-1) INLET CONTROL STRUCTURE (PICS-1) SUBSURFACE INFILTRATION BASIN CATCH BASIN OR MANHOLE SC-800 END CAP OPTIONAL INSPECTION PORT SC-800 CHAMBER ONE LAYER OF ADSPLUS625 WOVEN GEOTEXTILE BETWEEN FOUNDATION STONE AND CHAMBERS 5' MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS 24" (600 mm) HDPE ACCESS PIPE REQUIRED USE END CAP PART #: SC800ECEZ STORMTECH HIGHLY RECOMMENDS FLEXSTORM INSERTS IN ANY UPSTREAM STRUCTURES WITH OPEN GRATES SUMP DEPTH TBD BY SITE DESIGN ENGINEER (24" MIN RECOMMENDED) INSTALL FLAMP ON 24" (600 mm) ACESS PIPE PART #: SC80024RAMP ELEVATED BYPASS MANIFOLD 12" (300 mm) MIN 12" MIN51"3" MINSUBGRADE SOILS (SEE MANUFACTURER'S RECOMMENDATION) PAVEMENT LAYER (DESIGNED BY SITE DESIGN ENGINEER) 8' MAX ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL AROUND CLEAN, CRUSHED, ANGULAR STONE *TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR, INCREASE COVER TO 21". 15" 6" MIN EXCAVATION WALL (CAN BE SLOPED OR VERTICAL) PERIMETER STONE (SEE MANUFACTURER'S RECOMMENDATION) SC-800 END CAP 33" 6" MIN GRANULAR WELL GRADED SOIL/AGGREGATE MIXTURES, <35% FINES. COMPACT IN 6" LIFTS TO 95% STANDARD PROCTOR DENSITY. SEE THE TABLE OF ACCEPTABLE FILL MATERIALS. STORMTECH SC-800 ISOLATOR ROW DETAIL STORMTECH SC-800 CROSS-SECTION NOTE: INSPECTION PORTS MAY BE CONNECTED THROUGH ANY CHAMBER CORRUGATION CREST. STORMTECH CHAMBER 8" NYLOPLAST UNIVERSAL INLINE DRAIN BODY (PART# 2708AG4IPKIT) OR TRAFFIC RATED BOX W/SOLID LOCKING COVER CONCRETE COLLAR ASPHALT OVERLAY FOR TRAFFIC APPLICATIONS 12" MIN WIDTH 8" MIN THICKNESS OF ASPHALT OVERLAY AND CONCRETE COLLAR CONCRETE COLLAR / ASPHALT OVERLAY NOT REQUIRED FOR GREENSPACE OR NON-TRAFFIC APPLICATIONS 4" SDR 35 PIPE 4" INSERTA TEE TO BE CENTERED ON CORRUGATION CREST NYLOPLAST 8" LOCKING SOLID COVER AND FRAME INSERTA TEE DETAIL NTS INSERTA TEE CONNECTION CONVEYANCE PIPE MATERIAL MAY VARY (PVC, HDPE, ETC.) PLACE ADSPLUS WOVEN GEOTEXTILE (CENTERED ON INSERTA-TEE INLET) OVER BEDDING STONE FOR SCOUR PROTECTION AT SIDE INLET CONNECTIONS. GEOTEXTILE MUST EXTEND 6" PAST CHAMBER FOOT INSERTA TEE TO BE INSTALLED, CENTERED OVER CORRUGATION SIDE VIEWSECTION A-A A A DO NOT INSTALL INSERTA-TEE AT CHAMBER JOINTS NOTES: · PART NUMBERS WILL VARY BASED ON INLET PIPE MATERIALS. CONTACT STORMTECH FOR MORE INFORMATION. · CONTACT ADS ENGINEERING SERVICES IF INSERTA TEE INLET MUST BE RAISED AS NOT ALL INVERTS ARE POSSIBLE. CHAMBER MAX DIAMETER OF INSERTA TEE HEIGHT FROM BASE OF CHAMBER (X) SC-310 6" (150 mm) 4" (100 mm) SC-800 10" (250 mm) 4" (100 mm) DC-780 10" (250 mm) 4" (100 mm) MC-3500 12" (300 mm) 6" (150 mm) MC-4500 12" (300 mm) 8" (200 mm) MC-7200 12" (300 mm) 8" (200 mm) INSERTA TEE FITTINGS AVAILABLE FOR SDR 26, SDR 35, SCH 40 IPS GASKETED & SOLVENT WELD, N-12, HP STORM, C-900 OR DUCTILE IRON (X) STORMTECH SC-800 INSPECTION PORT DETAIL STORMTECH INSERTA-TEE SIDE INLET DETAIL A. Town comments 8/4/26 B. Drainage network & PICS-1 revisions 8/25/26
Page 45
DETAILS REV. RLA PROJ. NUMBER: DRAWING# OF MASSACHUSETTS STATE LAW THIS DOCUMENT IS A VIOLATION UNAUTHORIZED ALTERATION OF DATE: ISSUANCE DATE: REVISIONS: PREPARED FOR: ph: 413.568.0985 fax: 413.568.0986 rlaland.com Westfield, MA 01085 R L A 40 School Street SCALE: S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg Landscape Architects Civil Engineers · Land Surveyors Environmental Consultants R LEVESQUEASSOCIATES INC 37 Hartford Avenue Granby, CT 06035 Parcel ID: 4254 DRAFTED BY: As Noted R.E.L. May 28, 2026 Mr. Forrest Devine 129 Lovers Lane Granville, MA 01034 251219 PERMITTING NOT FOR CONSTRUCTION D-4 A (36" MIN) 7.08' 12" (MIN) 7.00'(MIN.) [84.0"] WATER QUALITY UNIT - BARRACUDA S4 (PWQU-1) VARIABLE OUTLET LOCATIONS VARIABLE INLET LOCATIONS DOWNSPOUT COLLECTOR DETAIL PRECAST CONCRETE CATCH BASIN ADS NYLOPLAST YARD DRAIN BASIN STANDARD DRAINAGE MANHOLE DETAIL A. Revision to catch basin detail 8/25/26
Page 46
DETAILS REV. RLA PROJ. NUMBER: DRAWING# OF MASSACHUSETTS STATE LAW THIS DOCUMENT IS A VIOLATION UNAUTHORIZED ALTERATION OF DATE: ISSUANCE DATE: REVISIONS: PREPARED FOR: ph: 413.568.0985 fax: 413.568.0986 rlaland.com Westfield, MA 01085 R L A 40 School Street SCALE: S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE_recover.dwg Landscape Architects Civil Engineers · Land Surveyors Environmental Consultants R LEVESQUEASSOCIATES INC 37 Hartford Avenue Granby, CT 06035 Parcel ID: 4254 DRAFTED BY: As Noted R.E.L. May 28, 2026 Mr. Forrest Devine 129 Lovers Lane Granville, MA 01034 251219 PERMITTING NOT FOR CONSTRUCTION D-5 A A. Town comments 8/4/26 SIGN SUMMARY
Page 47
COMPLIANCE NOTES REV. RLA PROJ. NUMBER: DRAWING# OF MASSACHUSETTS STATE LAW THIS DOCUMENT IS A VIOLATION UNAUTHORIZED ALTERATION OF DATE: ISSUANCE DATE: REVISIONS: PREPARED FOR: ph: 413.568.0985 fax: 413.568.0986 rlaland.com Westfield, MA 01085 R L A 40 School Street SCALE: S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg Landscape Architects Civil Engineers · Land Surveyors Environmental Consultants R LEVESQUEASSOCIATES INC 37 Hartford Avenue Granby, CT 06035 Parcel ID: 4254 DRAFTED BY: As Noted R.E.L. May 28, 2026 Mr. Forrest Devine 129 Lovers Lane Granville, MA 01034 251219 PERMITTING NOT FOR CONSTRUCTION D-6 A August 4, 2026 STORMWATER INSPECTION & MAINTENANCE PROCEDURE & CHECKLIST INVASIVE SPECIES MANAGEMENT PLAN The following management measures shall be implemented for the proposed improvements at 37 Hartford Avenue. All invasive species management activities shall be coordinated with a qualified professional experienced in the identification and treatment of invasive plant species. a. Pre-Construction Prior to the installation of mitigation plantings, the designated mitigation area shall be inspected by a qualified professional knowledgeable in the identification of invasive plant species. Existing invasive vegetation shall be identified and clearly marked for the contractor or personnel responsible for removal. Targeted invasive plants, including root systems to the maximum extent practicable, shall be removed from the site and disposed of at an approved off-site disposal facility. Hand removal methods shall be utilized whenever feasible to minimize disturbance to existing soils and native vegetation. Where hand removal is not practical, a small excavator may be used, provided that disturbance to surrounding soils and vegetation is minimized to the greatest extent practicable. b. During Construction Construction activities shall be conducted in a manner that minimizes soil disturbance and prevents the spread of invasive plant material and propagules. The following practices shall be implemented throughout construction: 1. Limit all earth disturbance to within the approved limits of work and installed erosion and sediment controls. 2. Clean construction equipment, vehicles, and landscaping equipment as necessary to remove soil, seeds, root fragments, and other plant material prior to entering or leaving the project site. 3. Utilize only certified weed-free plant material, mulch, topsoil, and seed mixes obtained from reputable suppliers. 4. Avoid unnecessary disturbance or damage to existing native vegetation during invasive species removal and construction activities. 5. Immediately collect all invasive plant cuttings and removed material and place them directly into bags or covered containers for off-site disposal. Removed material shall not be stockpiled on-site. 6. Under no circumstances shall invasive plant material, cuttings, or other vegetative debris be placed within or allowed to enter wetlands, watercourses, or other regulated resource areas, even on a temporary basis. c. Post-Construction Monitoring Invasive species management shall continue following completion of construction for a minimum period of three (3) years or as required by the municipal Inland Wetlands and Watercourses Commission. The mitigation area shall be inspected at least twice annually, once during the spring growing season and once during the early fall, to identify the presence or re-establishment of invasive plant species. Additional inspections may be conducted as necessary based on site conditions. Any invasive species identified during the monitoring period shall be removed or treated in accordance with the procedures outlined in Section 2(d). Monitoring shall also evaluate the successful establishment of native mitigation plantings and identify any maintenance measures necessary to ensure their long-term success. d. Invasive Species Treatment Due to the proximity of regulated wetland resource areas, invasive plant species should be controlled using methods that minimize impacts to adjacent native vegetation and sensitive environmental resources. Removal by hand shall be the preferred treatment method where practical. During the active growing season, invasive plants should be cut by hand while in full leaf to reduce their ability to photosynthesize and regenerate. Where appropriate, root systems shall be removed to the maximum extent practicable. Herbicides are prohibited unless approval from the Town of Granby Inland Wetlands and Watercourses Commission is given. If approval is given, the Project Proponent shall provide the Town of Granby Inland Wetlands Agent with the name, license information, and contact information of the licensed herbicide applicator responsible for performing the work. Herbicide applications shall be performed in strict accordance with all applicable federal, state, and local regulations, including those governing applications adjacent to wetlands and watercourses. e. Reporting and Coordination Upon completion of each invasive species management event, the Project Proponent or the Proponent's designated contractor shall notify the Town of Granby Inland Wetlands and Watercourses Commission that the work has been completed. Each notification shall include a brief summary describing: · The date(s) the work was performed; · The invasive species identified; · The treatment methods implemented; · Areas treated; · Any herbicides applied, if applicable; and · Recommendations for any follow-up monitoring or additional treatment. The Project Proponent is encouraged to coordinate periodically with the Town of Granby Inland Wetlands Agent throughout the monitoring period to review the effectiveness of management activities and identify any additional areas requiring treatment. A. IWWA comments 8/25/26
Page 48
Page 49
Page 50
APPLICATION FOR INLAND WETLANDS & WATERCOURSES ACTIVITY REQUEST FOR REVIEW For submission from Nicholas Kimball & Marissa Nasshan 12 Northwoods Rd, North Granby, CT 06060 Submission topic- removing sediment from pond
Page 51
OVERVIEW MAP 12 Northwoods- applicant & owner address/home pictured top left. Subject pond in middle of screen. Red circle depicting the area shown in following slides.
Page 52
VEGETATION CONSUMING AREA AROUND CULVERT This past summer with large volumes of rain water from the storms, a quite large volume of sediment has accumulated which then allowed vegetation to thrive. It is further slowing the normal stream flow and could cause a back up around the culvert with a significant storm.
Page 53
SIDE ANGLE OF SUBJECT AREA This subject area is the southwest corner of the pond of a square footage around 40 sq ft.
Page 54
Page 55
THE TASK We’d like to remove the sediment depicted inside the red circle of this photo. We want to have an excavator come in and remove the sediment just enough to remove vegetation and to allow natural flow from the culvert at the bottom of the photo.
Page 56
EVENTUAL REMEDIATION Request to remove vegetation in future along hardscape areas.
Page 57
PRECAUTIONS We don’t want to hurt wildlife in the pond. Any excavation will be strictly inside the depicted circle and of minimal depth in order to remove vegetation and elevated levels of sediment. The excavator provider is equipped with a spill kit to prevent any potential leak run offs. We understand the towns interest in soil quality and its final disposition. We are open for the towns guidance. We can find a location elsewhere on our property to try and spread it out, or have it removed from property and provided to the town, or have it removed to a disposal site of our hauler.
Page 58
FINAL NOTES Thank you, This is in conjunction with a Request for review document submitted 8/27/2026 to the Town of Granby, CT. This is in regards to the property of Nicholas Kimball & Marissa Nasshan 12 Northwoods Rd, North Granby, CT 06060 860-803-2061 cell (Nicholas Kimball) Email: kimballni@gmail.com
Page 59
Page 60
TOWN OF GRANBY Office of Community Development, Inland Wetlands and Watercourses Commission Telephone: (860 ) 844-5318, www.granby-ct.gov Application for Inland Wetlands & Watercourses Activity Application For: Permit Extension Modification (Existing Permit/Application #): __________________________ Wetlands Map Amend. Request for Review Other: Property Location and Nearest Intersection: Size of Parcel:_________ Zone: ________ Map/Lot: ____________ Current Use: ___________________________ Applicant’s Name: Complete Address: Daytime Phone: Evening Phone: Fax: Email: Owner’s Name: If the owner is a corporation, or other non-individual entity, include the primary contact information Complete Address: Phone Daytime Phone: Evening Phone: Fax: Applicant’s Representative: Complete Address: Daytime Phone: Evening Phone: Fax: Wetlands Located on Property (in square feet (sq. ft.)): Wetlands to be impacted (sq. ft.): Watercourses Located on Property? Name or Type of Watercourse: Are Proposed Activities Located within the 100-Year Floodplain? Floodway? Are there slopes with grades in excess of 15% located on the property? Do Proposed Activities Require Review by the PZC? *********SEE APPLICATION CHECKLIST ON BACK for MINIMUM APPLICATION REQUIREMENTS********** The applicant understands that this application is to be considered complete only when all information and documents required by the Commission have been submitted. The undersigned warrants the truth of all statements contained herein and in all supporting documents according to the best of his/her knowledge and belief. Permission is granted to the Town of Granby, Inland Wetlands & Watercourses Commission, and its agent (s) to inspect the subject land, at reasonable times, during the pendency of an application and for the life of the permit. Applicant’s Signature: Date: Owner’s Signature: Date: FOR OFFICE USE Application #: Date Submitted: Fee amt./Check or Cash: Date of Receipt: Agent Ruling: Date Approved/Denied: See Reverse Side for Conditions of Approval or Reason for Denial Property is located east and northeast of Salmon Brook Fall (Route 10) and Floyville Road Intersection. 53/78/28 Nursery I215.36 Broadleaf Solar, LLC Broadleaf Solar, LLC 207-239-8782 207-239-8782 Yes 01Mil +/- X No No yes but not subject to the farming activities No unnamed tributaries to Salmon Brook Jonathan Gravel jon.gravel@desri.com 575 Fifth Ave., 24th Fl. | New York, NY 10017 575 Fifth Ave., 24th Fl. | New York, NY 10017 575 Fifth Ave., 24th Fl. | New York, NY 10017 (212) 478-0000 (212) 478-0000 *******************************PLEASE ATTACH ADDITIONAL SH EET IF NECESSARY************************************** Project Name and Brief Description (i.e. residential, agricultural, commercial, number of lots, etc.): In continuation of the ongoing seeding and site stabilization efforts, and following dir ection provided by the IWWC at its August meeting, Kevin Sullivan (local farmer) has begun implementing agronomic erosion- control measures at four identified locations (refer to enclosed map) . These measures are intended to stabilize areas of pre-existing erosion, reduce further soil loss, and prevent sediment from migrating off-site and into adjacent natural areas. The work has been prioritized as follows: 1.) Contain existing sedimentation through the installation of staked straw wattles. 2 ). Manage stormwater runoff through the installation of temporary diversion swales and sediment traps.These agronomic measures are intended to slow and disperse st ormwater runoff, promote natural infiltration, capture sediment, and prevent additional erosion. Kevin will contniue monitory and adjust accordingly. Is any portion of the property located within 500 feet of an adjoining municipality? g() p HM001348 0000007472
Page 61
Page 62
Page 63
Page 64
Page 65
Page 66
Page 67
SALMON BROOK PARK CONNECTOR TO AUXILARY PARKING 215 SALMON BROOK STREET GRANBY, CONNECTICUT INLAND WETLANDS APPLICATION STATEWIDE INLAND WETLANDS & WATERCOURSES ACTIVITY REPORTING FORM SEPTEMBER 3, 2026 KEVIN CLARK, PEL-TOWN ENGINEER
Page 68
CONTENTS: APPLICATION COVER SHEET PERMIT APPLICATION FOR INLAND WETLANDS & WATERCOURSE ACTIVITY APPLICATION CHECKLIST APPLICATION FEES (WORKSHEET) STATEWIDE INLAND WETLANDS & WATERCOURSES ACTIVITY REPORTING FORM NRCS SOIL REPORT PROJECT NARRATIVE MITIGATION NARRATIVE PLANS (9 SHEETS)
Page 69
Page 70
Page 71
Page 72
United States Department of Agriculture A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for State of Connecticut, Western Part Salmon Brook Park-Sidewalk Extension Natural Resources Conservation Service March 16, 2026
Page 73
Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/ portal/nrcs/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https://offices.sc.egov.usda.gov/locator/app?agency=nrcs) or your NRCS State Soil Scientist (http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/contactus/? cid=nrcs142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require 2
Page 74
alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. 3
Page 75
Contents Preface.................................................................................................................... 2 How Soil Surveys Are Made..................................................................................5 Soil Map.................................................................................................................. 8 Soil Map................................................................................................................9 Legend................................................................................................................10 Map Unit Legend................................................................................................ 11 Map Unit Descriptions.........................................................................................11 State of Connecticut, Western Part.................................................................13 29A—Agawam fine sandy loam, 0 to 3 percent slopes...............................13 38C—Hinckley loamy sand, 3 to 15 percent slopes....................................14 38E—Hinckley loamy sand, 15 to 45 percent slopes..................................16 100—Suncook loamy fine sand...................................................................19 101—Occum fine sandy loam..................................................................... 20 105—Hadley silt loam................................................................................. 22 106—Winooski silt loam..............................................................................24 References............................................................................................................26 4
Page 76
How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil-vegetation-landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil 5
Page 77
scientists classified and named the soils in the survey area, they compared the individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research. The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil-landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil-landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field-observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and Custom Soil Resource Report 6
Page 78
identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately. Custom Soil Resource Report 7
Page 79
Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 8
Page 80
9 Custom Soil Resource Report Soil Map 4646300 4646400 4646500 4646600 4646700 4646800 4646900 4647000 4646300 4646400 4646500 4646600 4646700 4646800 4646900 4647000 681800 681900 682000 682100 682200 682300 682400 682500 682600 682700 682800 682900 681900 682000 682100 682200 682300 682400 682500 682600 682700 682800 682900 683000 41° 57' 14'' N 72° 48' 23'' W 41° 57' 14'' N 72° 47' 31'' W 41° 56' 49'' N 72° 48' 23'' W 41° 56' 49'' N 72° 47' 31'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 18N WGS84 0 250 500 1000 1500 Feet 0 50 100 200 300 Meters Map Scale: 1:5,500 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale.
Page 81
MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:12,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: State of Connecticut, Western Part Survey Area Data: Version 6, Sep 16, 2025 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jun 14, 2022—Jul 1, 2024 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 10
Page 82
Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 29A Agawam fine sandy loam, 0 to 3 percent slopes 4.7 7.5% 38C Hinckley loamy sand, 3 to 15 percent slopes 2.5 4.0% 38E Hinckley loamy sand, 15 to 45 percent slopes 9.2 14.6% 100 Suncook loamy fine sand 11.6 18.6% 101 Occum fine sandy loam 28.1 44.9% 105 Hadley silt loam 5.8 9.3% 106 Winooski silt loam 0.7 1.1% Totals for Area of Interest 62.6 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it Custom Soil Resource Report 11
Page 83
was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha-Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. Custom Soil Resource Report 12
Page 84
State of Connecticut, Western Part 29A—Agawam fine sandy loam, 0 to 3 percent slopes Map Unit Setting National map unit symbol: 2tyqw Landscape: Valleys, outwash plains Elevation: 0 to 1,040 feet Mean annual precipitation: 36 to 71 inches Mean annual air temperature: 39 to 55 degrees F Frost-free period: 140 to 250 days Farmland classification: All areas are prime farmland Map Unit Composition Agawam and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Agawam Setting Landscape: Valleys, outwash plains Landform: Moraines, Kames, Kame terraces, Outwash plains, Outwash terraces Landform position (two-dimensional): Summit, shoulder, backslope, footslope Landform position (three-dimensional): Side slope, crest, riser, tread, rise, dip Down-slope shape: Convex Across-slope shape: Convex Parent material: Coarse-loamy eolian deposits over sandy and gravelly glaciofluvial deposits derived from gneiss, granite, schist, and/or phyllite Typical profile Ap - 0 to 11 inches: fine sandy loam Bw1 - 11 to 16 inches: fine sandy loam Bw2 - 16 to 26 inches: fine sandy loam 2C1 - 26 to 39 inches: loamy fine sand 2C2 - 39 to 55 inches: loamy fine sand 2C3 - 55 to 65 inches: loamy sand Properties and qualities Slope: 0 to 3 percent Depth to restrictive feature: 15 to 35 inches to strongly contrasting textural stratification Drainage class: Well drained Runoff class: Very low Capacity of the most limiting layer to transmit water (Ksat): Moderately low to high (0.14 to 14.17 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Maximum salinity: Nonsaline (0.0 to 1.9 mmhos/cm) Available water supply, 0 to 60 inches: Low (about 3.4 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2s Custom Soil Resource Report 13
Page 85
Hydrologic Soil Group: B Ecological site: F145XY008MA - Dry Outwash Hydric soil rating: No Minor Components Ninigret Percent of map unit: 5 percent Landscape: Valleys Landform: Terraces Down-slope shape: Linear Across-slope shape: Concave Hydric soil rating: No Windsor Percent of map unit: 4 percent Landscape: Valleys Landform: Dunes, Deltas, Outwash terraces, Outwash plains Landform position (three-dimensional): Tread, riser Down-slope shape: Convex, linear Across-slope shape: Convex, linear Hydric soil rating: No Walpole Percent of map unit: 3 percent Landscape: Outwash plains Landform: Deltas, Depressions, Outwash terraces, Depressions, Outwash plains Landform position (two-dimensional): Toeslope Landform position (three-dimensional): Tread, talf, dip Down-slope shape: Concave Across-slope shape: Concave Hydric soil rating: Yes Hinckley Percent of map unit: 3 percent Landscape: Outwash plains, valleys Landform: Deltas, Kames, Eskers, Outwash plains Landform position (two-dimensional): Summit, shoulder, backslope Landform position (three-dimensional): Head slope, nose slope, side slope, crest, rise Down-slope shape: Convex Across-slope shape: Convex, linear Hydric soil rating: No 38C—Hinckley loamy sand, 3 to 15 percent slopes Map Unit Setting National map unit symbol: 2svmb Landscape: Uplands, valleys Elevation: 0 to 1,290 feet Mean annual precipitation: 36 to 71 inches Custom Soil Resource Report 14
Page 86
Mean annual air temperature: 39 to 55 degrees F Frost-free period: 140 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Hinckley and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Hinckley Setting Landscape: Uplands, valleys Landform: Outwash deltas, Outwash terraces, Moraines, Eskers, Kames, Outwash plains, Kame terraces Landform position (two-dimensional): Summit, shoulder, backslope, footslope, toeslope Landform position (three-dimensional): Head slope, nose slope, side slope, crest, riser, tread Down-slope shape: Concave, convex, linear Across-slope shape: Convex, linear, concave Parent material: Sandy and gravelly glaciofluvial deposits derived from gneiss and/or granite and/or schist Typical profile Oe - 0 to 1 inches: moderately decomposed plant material A - 1 to 8 inches: loamy sand Bw1 - 8 to 11 inches: gravelly loamy sand Bw2 - 11 to 16 inches: gravelly loamy sand BC - 16 to 19 inches: very gravelly loamy sand C - 19 to 65 inches: very gravelly sand Properties and qualities Slope: 3 to 15 percent Depth to restrictive feature: More than 80 inches Drainage class: Excessively drained Runoff class: Very low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to very high (1.42 to 99.90 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Maximum salinity: Nonsaline (0.0 to 1.9 mmhos/cm) Available water supply, 0 to 60 inches: Low (about 3.1 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4e Hydrologic Soil Group: A Ecological site: F144AY022MA - Dry Outwash Hydric soil rating: No Minor Components Windsor Percent of map unit: 5 percent Landscape: Uplands, valleys Custom Soil Resource Report 15
Page 87
Landform: Moraines, Eskers, Kames, Outwash deltas, Outwash terraces, Outwash plains, Kame terraces Landform position (two-dimensional): Summit, shoulder, backslope, footslope, toeslope Landform position (three-dimensional): Head slope, nose slope, side slope, crest, riser, tread Down-slope shape: Concave, convex, linear Across-slope shape: Convex, linear, concave Hydric soil rating: No Merrimac Percent of map unit: 5 percent Landscape: Valleys, outwash plains Landform: Kames, Outwash plains, Outwash terraces, Moraines, Eskers Landform position (two-dimensional): Summit, shoulder, backslope, footslope, toeslope Landform position (three-dimensional): Head slope, nose slope, side slope, crest, riser, tread Down-slope shape: Convex Across-slope shape: Convex Hydric soil rating: No Agawam Percent of map unit: 3 percent Landscape: Uplands, valleys Landform: Eskers, Kames, Outwash plains, Kame terraces, Outwash deltas, Outwash terraces, Moraines Landform position (two-dimensional): Summit, shoulder, backslope, toeslope, footslope Landform position (three-dimensional): Head slope, nose slope, side slope, crest, riser, tread Down-slope shape: Concave, convex, linear Across-slope shape: Convex, linear, concave Hydric soil rating: No Sudbury Percent of map unit: 2 percent Landscape: Valleys, uplands Landform: Outwash deltas, Moraines, Outwash plains, Kame terraces, Outwash terraces Landform position (two-dimensional): Backslope, footslope Landform position (three-dimensional): Base slope, tread Down-slope shape: Concave, linear Across-slope shape: Concave, linear Hydric soil rating: No 38E—Hinckley loamy sand, 15 to 45 percent slopes Map Unit Setting National map unit symbol: 2svmj Custom Soil Resource Report 16
Page 88
Landscape: Uplands, valleys Elevation: 0 to 1,280 feet Mean annual precipitation: 36 to 71 inches Mean annual air temperature: 39 to 55 degrees F Frost-free period: 140 to 240 days Farmland classification: Not prime farmland Map Unit Composition Hinckley and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Hinckley Setting Landscape: Uplands, valleys Landform: Eskers, Kames, Outwash deltas, Outwash terraces, Moraines, Outwash plains, Kame terraces Landform position (two-dimensional): Backslope Landform position (three-dimensional): Head slope, nose slope, side slope, crest, riser Down-slope shape: Concave, convex, linear Across-slope shape: Convex, linear, concave Parent material: Sandy and gravelly glaciofluvial deposits derived from gneiss and/or granite and/or schist Typical profile Oe - 0 to 1 inches: moderately decomposed plant material A - 1 to 8 inches: loamy sand Bw1 - 8 to 11 inches: gravelly loamy sand Bw2 - 11 to 16 inches: gravelly loamy sand BC - 16 to 19 inches: very gravelly loamy sand C - 19 to 65 inches: very gravelly sand Properties and qualities Slope: 15 to 45 percent Depth to restrictive feature: More than 80 inches Drainage class: Excessively drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to very high (1.42 to 99.90 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Maximum salinity: Nonsaline (0.0 to 1.9 mmhos/cm) Available water supply, 0 to 60 inches: Low (about 3.1 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 7e Hydrologic Soil Group: A Ecological site: F144AY022MA - Dry Outwash Hydric soil rating: No Custom Soil Resource Report 17
Page 89
Minor Components Windsor Percent of map unit: 5 percent Landscape: Uplands, valleys Landform: Eskers, Kames, Moraines, Outwash deltas, Outwash terraces, Outwash plains, Kame terraces Landform position (two-dimensional): Backslope Landform position (three-dimensional): Head slope, nose slope, side slope, crest, riser Down-slope shape: Concave, convex, linear Across-slope shape: Convex, linear, concave Hydric soil rating: No Merrimac Percent of map unit: 5 percent Landscape: Valleys, outwash plains Landform: Outwash plains, Outwash terraces, Moraines, Eskers, Kames Landform position (two-dimensional): Backslope Landform position (three-dimensional): Head slope, nose slope, side slope, crest, riser Down-slope shape: Convex Across-slope shape: Convex Hydric soil rating: No Agawam Percent of map unit: 3 percent Landscape: Uplands, valleys Landform: Eskers, Kame terraces, Outwash deltas, Outwash terraces, Moraines, Kames, Outwash plains Landform position (two-dimensional): Backslope Landform position (three-dimensional): Head slope, nose slope, side slope, crest, riser Down-slope shape: Concave, convex, linear Across-slope shape: Convex, linear, concave Hydric soil rating: No Sudbury Percent of map unit: 2 percent Landscape: Valleys, uplands Landform: Kames, Eskers, Outwash deltas, Outwash plains, Kame terraces, Outwash terraces, Moraines Landform position (two-dimensional): Backslope, footslope Landform position (three-dimensional): Base slope, tread Down-slope shape: Concave, linear Across-slope shape: Linear, concave Hydric soil rating: No Custom Soil Resource Report 18
Page 90
100—Suncook loamy fine sand Map Unit Setting National map unit symbol: 9ljl Elevation: 0 to 1,200 feet Mean annual precipitation: 43 to 54 inches Mean annual air temperature: 45 to 55 degrees F Frost-free period: 140 to 185 days Farmland classification: Farmland of statewide importance Map Unit Composition Suncook and similar soils: 80 percent Minor components: 20 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Suncook Setting Landform: Flood plains Down-slope shape: Linear Across-slope shape: Convex Parent material: Sandy alluvium Typical profile Ap - 0 to 7 inches: loamy fine sand C1 - 7 to 15 inches: stratified coarse sand to loamy fine sand C2 - 15 to 22 inches: stratified coarse sand to loamy fine sand C3 - 22 to 32 inches: stratified coarse sand to loamy fine sand C4 - 32 to 42 inches: stratified coarse sand to loamy fine sand C5 - 42 to 65 inches: stratified gravelly coarse sand to loamy fine sand Properties and qualities Slope: 0 to 3 percent Depth to restrictive feature: More than 80 inches Drainage class: Excessively drained Runoff class: Very low Capacity of the most limiting layer to transmit water (Ksat): High to very high (5.95 to 99.62 in/hr) Depth to water table: About 60 to 72 inches Frequency of flooding: Occasional Frequency of ponding: None Available water supply, 0 to 60 inches: Low (about 3.1 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2s Hydrologic Soil Group: A Ecological site: F144AY006CT - High Floodplain Levee Hydric soil rating: No Custom Soil Resource Report 19
Page 91
Minor Components Occum Percent of map unit: 5 percent Landform: Flood plains Down-slope shape: Linear Across-slope shape: Linear Hydric soil rating: No Pootatuck Percent of map unit: 5 percent Landform: Flood plains Down-slope shape: Linear Across-slope shape: Concave Hydric soil rating: No Unnamed, no flooding Percent of map unit: 4 percent Hydric soil rating: No Saco Percent of map unit: 3 percent Landform: Flood plains Down-slope shape: Concave Across-slope shape: Concave Hydric soil rating: Yes Rippowam Percent of map unit: 3 percent Landform: Flood plains Down-slope shape: Linear Across-slope shape: Concave Hydric soil rating: Yes 101—Occum fine sandy loam Map Unit Setting National map unit symbol: 9ljm Elevation: 0 to 1,200 feet Mean annual precipitation: 43 to 54 inches Mean annual air temperature: 45 to 55 degrees F Frost-free period: 140 to 185 days Farmland classification: All areas are prime farmland Map Unit Composition Occum and similar soils: 80 percent Minor components: 20 percent Estimates are based on observations, descriptions, and transects of the mapunit. Custom Soil Resource Report 20
Page 92
Description of Occum Setting Landform: Flood plains Down-slope shape: Linear Across-slope shape: Linear Parent material: Coarse-loamy alluvium Typical profile Ap - 0 to 10 inches: fine sandy loam Bw1 - 10 to 17 inches: fine sandy loam Bw2 - 17 to 28 inches: sandy loam C1 - 28 to 32 inches: stratified very gravelly coarse sand to loamy fine sand C2 - 32 to 42 inches: stratified very gravelly coarse sand to loamy fine sand C3 - 42 to 65 inches: stratified very gravelly coarse sand to loamy fine sand Properties and qualities Slope: 0 to 3 percent Depth to restrictive feature: More than 80 inches Drainage class: Well drained Runoff class: Very low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 5.95 in/hr) Depth to water table: About 60 to 72 inches Frequency of flooding: Occasional Frequency of ponding: None Available water supply, 0 to 60 inches: Low (about 5.4 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 1 Hydrologic Soil Group: B Ecological site: F144AY010NH - Sandy High Floodplain Hydric soil rating: No Minor Components Suncook Percent of map unit: 5 percent Landform: Flood plains Down-slope shape: Linear Across-slope shape: Convex Hydric soil rating: No Agawam Percent of map unit: 5 percent Landscape: Valleys Landform: Terraces, Outwash plains Down-slope shape: Linear Across-slope shape: Linear Hydric soil rating: No Pootatuck Percent of map unit: 5 percent Landform: Flood plains Down-slope shape: Linear Across-slope shape: Concave Custom Soil Resource Report 21
Page 93
Hydric soil rating: No Rippowam Percent of map unit: 5 percent Landform: Flood plains Down-slope shape: Linear Across-slope shape: Concave Hydric soil rating: Yes 105—Hadley silt loam Map Unit Setting National map unit symbol: 9ljr Elevation: 0 to 1,200 feet Mean annual precipitation: 43 to 54 inches Mean annual air temperature: 45 to 55 degrees F Frost-free period: 140 to 185 days Farmland classification: All areas are prime farmland Map Unit Composition Hadley and similar soils: 80 percent Minor components: 20 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Hadley Setting Landform: Flood plains Down-slope shape: Linear Across-slope shape: Linear Parent material: Coarse-silty alluvium Typical profile Ap - 0 to 12 inches: silt loam C1 - 12 to 29 inches: stratified very fine sand to silt loam C2 - 29 to 40 inches: stratified very fine sand to silt loam C3 - 40 to 45 inches: stratified sand to silt loam C4 - 45 to 60 inches: stratified sand to silt loam Properties and qualities Slope: 0 to 3 percent Depth to restrictive feature: More than 80 inches Drainage class: Well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: About 60 to 72 inches Frequency of flooding: Occasional Frequency of ponding: None Available water supply, 0 to 60 inches: High (about 11.0 inches) Custom Soil Resource Report 22
Page 94
Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 1 Hydrologic Soil Group: B Ecological site: F145XY001MA - Silty High Floodplain Hydric soil rating: No Minor Components Winooski Percent of map unit: 5 percent Landform: Flood plains Down-slope shape: Linear Across-slope shape: Linear Hydric soil rating: No Bash Percent of map unit: 5 percent Landform: Flood plains Down-slope shape: Concave Across-slope shape: Concave Hydric soil rating: Yes Lim Percent of map unit: 3 percent Landform: Flood plains Down-slope shape: Concave Across-slope shape: Concave Hydric soil rating: Yes Unnamed, sand or gravel substratum Percent of map unit: 3 percent Hydric soil rating: No Saco Percent of map unit: 2 percent Landform: Flood plains Down-slope shape: Concave Across-slope shape: Concave Hydric soil rating: Yes Limerick Percent of map unit: 2 percent Landform: Flood plains Down-slope shape: Concave Across-slope shape: Concave Hydric soil rating: Yes Custom Soil Resource Report 23
Page 95
106—Winooski silt loam Map Unit Setting National map unit symbol: 9ljs Elevation: 0 to 1,200 feet Mean annual precipitation: 43 to 54 inches Mean annual air temperature: 45 to 55 degrees F Frost-free period: 140 to 185 days Farmland classification: All areas are prime farmland Map Unit Composition Winooski and similar soils: 80 percent Minor components: 20 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Winooski Setting Landform: Flood plains Down-slope shape: Linear Across-slope shape: Linear Parent material: Coarse-silty alluvium Typical profile Ap - 0 to 12 inches: silt loam B1 - 12 to 18 inches: silt loam B2 - 18 to 36 inches: silt loam C3 - 36 to 52 inches: very fine sandy loam C4 - 52 to 65 inches: silt loam Properties and qualities Slope: 0 to 3 percent Depth to restrictive feature: More than 80 inches Drainage class: Moderately well drained Runoff class: Very low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: About 16 to 36 inches Frequency of flooding: Frequent Frequency of ponding: None Available water supply, 0 to 60 inches: High (about 11.4 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2w Hydrologic Soil Group: B/D Ecological site: F145XY002MA - Silty Low Floodplain Hydric soil rating: No Custom Soil Resource Report 24
Page 96
Minor Components Hadley Percent of map unit: 5 percent Landform: Flood plains Down-slope shape: Linear Across-slope shape: Linear Hydric soil rating: No Bash Percent of map unit: 3 percent Landform: Flood plains Down-slope shape: Concave Across-slope shape: Concave Hydric soil rating: Yes Lim Percent of map unit: 3 percent Landform: Flood plains Down-slope shape: Concave Across-slope shape: Concave Hydric soil rating: Yes Limerick Percent of map unit: 3 percent Landform: Flood plains Down-slope shape: Concave Across-slope shape: Concave Hydric soil rating: Yes Saco Percent of map unit: 2 percent Landform: Flood plains Down-slope shape: Concave Across-slope shape: Concave Hydric soil rating: Yes Unnamed, strongly acid ph Percent of map unit: 2 percent Hydric soil rating: No Unnamed, sand or gravel substratum Percent of map unit: 2 percent Hydric soil rating: No Custom Soil Resource Report 25
Page 97
References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/national/soils/?cid=nrcs142p2_054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/ home/?cid=nrcs142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nrcs.usda.gov/wps/portal/nrcs/ detail/national/landuse/rangepasture/?cid=stelprdb1043084 26
Page 98
United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/soils/scientists/?cid=nrcs142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/? cid=nrcs142p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf Custom Soil Resource Report 27
Page 99
PROJECT NARRATIVE: THE PROPOSED PROJECT CONSISTS OF THE CONSTRUCTION OF A PEDESTRIAN WALKING PATH IN THE TOWN PARK. THE PURPOSE OF THE WALK IS TO CONNECT THE EXISTING BITUMINOUS WALK WITH A NEW WALK THAT WILL PROVIDE AN ACCESSIBLE ROUTE TO THE ROVERS SOCCER FIELDS. THE EXISTING WOODS TRAIL FROM THE PARKING LOT TO THE NORTHERNMOST FIELD WILL BE REBUILT IN IT'S CURRENT LOCATION. A SERIES OF STAIRS WILL BE ADDED TO THE PATH TO EASE THE ASSENT OF THE STEEP SLOPE. THE PROJECT AREA IS APPROXIMATELY 25,580 S.F OF THE EXISTING 116 ACRE PARK. THE 5-FT WIDE NEW BITUMINOUS WALK WILL BE APPROXIMATELY 1514 FEET LONG COVERING 7680 SF AND WILL MOSTLY BE LOCATED IN EXISTING GRASSED AREAS. PROPOSED GRADES WILL MOSTLY MATCH THE EXISTING GRADES. THE WALK WILL BE CONSTRUCTED OF BITUMINOUS CONCRETE AS IS INTENDED FOR PEDESTRIAN WALKING USE. THE PROPOSED WOODS TRAIL WILL FOLLOW THE EXISTING ROUTE. THE PATH WILL BE REBUILT AS A 6-FT WIDE STONE DUST PATH WITH STAIRS. THE PATH IS 630-FT LONG AND COVERS APPROXIMATELY 3790 S.F. THE SITE CONTAINS APPROXIMATELY 2,693,000 SF (61.8 AC.) OF WETLAND SOILS AND WATERCOURSES. THE WETLAND SOILS ARE OCCUM FINE SANDY LOAM AND SUNCOOK LOAMY FINE SAND WHICH ARE ALLUVIAL AND FLOOD PLAIN SOILS. THEY ARE PRESENTLY COVERED BY 89,358 SF (2.1 AC.) OF IMPERVIOUS SURFACE. APPROXIMATELY 1,600 LF (8000 SF) OF BITUMINOUS WALK WILL BE LOCATED IN WETLAND (FLOODPLAIN) SOILS. THE RECONSTRUCTED WOODS PATH WILL COVER APPROXIMATELY 2722 S.F. OF WETLANDS/REGULATED AREA. IN ADDITION, A TOTAL OF 15,000 SF OF WETLAND (FLOODPLAIN) AREA WILL BE DISTURBED. ALL EXCEPT 9960 SF. WILL BE TEMPORARY. THE BALANCE OF THE SITE CONTAINS HINCKLEY GRAVELY SANDY LOAM SOILS OR IS HINCKLEY URBAN LAND COMPLEX. OTHER THAN THE FLOOD PLAIN SOILS, THERE ARE NO SIGNIFICANT AREAS OF WETLAND SOILS. EXCEPT FOR THE AREA ADJACENT TO THE WEST BRANCH OF SALMON BROOK WHICH IS LOCATED ALONG THE WESTERLY BORDER OF THE PROJECT. THERE ARE NO ACTIVITIES PROPOSED WITHIN THE BROOK AND EXISTING DRAINAGE PATTERNS WILL BE MAINTAINED. TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES WILL BE IMPLEMENTED DURING CONSTRUCTION. THE ANTICIPATED CONSTRUCTION WILL BEGIN IN THE SPRING OF 2027 AND END IN THE FALL OF 2027.
Page 100
Mitigation Narrative Impacts associated with the construction and maintenance of the proposed sidewalk and sitting areas are minimal, limited to the addition of impervious area within an alluvial wetland and the URA of the Salmon Brook. The area where the sidewalk will be installed is currently maintained lawn for recreation, and as part of the project the lawn area will be restored to native vegetation as designated by the following mitigation plan below and as depicted on the “Plan Town of Granby Salmon Brook Park Connector to Auxiliary Parking, 215 Salmon Brook Street, Granby, CT”, dated 9.3.26, cover sheet, C1-C4 and DE1-DE3, as amended. Potential impacts during construction are limited to sediment migration from the construction area into a regulated area. As seen during the first phase of the sidewalk, soil disturbance associated with this project is minimal and temporary. Barrier erosion controls will be temporarily placed as necessary to prevent sediment migration during precipitation events, and the area will be seeded and mulched as soon as possible. A quick germinating seed mix will provide for both rapid and long-term vegetative stabilization. This project could potentially fit the requirements of a nonregulated use, due to the goal of providing equitable outdoor recreation opportunities, however, it requires a good amount of disturbance and therefore a permit is requested. The town proposes to incorporate vegetation management and planting efforts at key areas along the project route. These areas were selected where areas could use deeply rooted vegetation for long-term soil stabilization measures adjacent to the Salmon Brook. Plantings in the chosen locations will provide additional vegetative buffers along Salmon Brook, aiding in long-term bank stability and park/project protection. Mitigation efforts shall be supervised daily during vegetation removal and planting operations by the Granby Wetlands Agent or the IWWC designee. These efforts shall include invasive species removal, soil stabilization plantings, and signage at a Salmon Brook access trail. The following describes the mitigation activities in detail for the project, including how each mitigation area shall be treated. Sitewide – Along the project route, all vines that are choking trees shall be cut at their base and an herbicide applied to the fresh cut stump. A cone sprayer or paint on method may be utilized and applied in accordance with all applicable laws. The extent of oriental bittersweet (Celastrus orbiculatus) in some locations is extensive, and complete eradication is highly unlikely due to the riverine location providing a constant seed source for potential species re-establishment. Therefore, a more realistic goal is to preserve mature trees that are being “strangled” by vines. Vines do not need to be removed from the tree or the site but allowed to degrade in place. As directed by the supervising IWWC designee, target invasive species shall be removed and properly disposed. The target species includes but is not limited to large autumn olive (Elaeagnum umbellata) and multiflora rose (Rosa multiflora) species. Area 1- This area is adjacent to a bend in the Salmon Brook and is currently maintained lawn. To aid in preserving the upland area adjacent to the banks, 3 trees and 10 shrubs are recommended to be installed in this area. Included in this area are 3 perennial islands, each perennial island shall include 6 herbaceous plantings. It is recommended that the area continue to be mowed between the tree and shrubs for 2 years, or longer if approved, to prevent invasive species overgrowth. Once strong establishment of plantings, the area may no longer be mowed. All plantings shall be clearly staked. Area 2 – This area is vegetated but does not contain any canopy trees. It is proposed to install 1 tree in this location that is greater than 6 feet tall. An area around the tree
Page 101
installation area shall be cleared of invasive species. Mowing around installed trees shall occur for 2 full growing seasons. Area 3 - This area is vegetated but does not contain any canopy trees. It is proposed to install 2 trees and 6 shrubs in this location that is greater than 6 feet tall. An area around the tree installation area shall be cleared of invasive species. Mowing around installed trees shall occur for 2 full growing seasons. Area 4 - This area is vegetated but does not contain any canopy trees. It is proposed to install 1 tree in this location that is greater than 6 feet tall. An area around the tree installation area shall be cleared of invasive species. Mowing around installed trees shall occur for 2 full growing seasons. Area 5 – Along the tree line, a line of herbaceous perennials are proposed to be installed. This will increase the root profile and reduce mowing in this critical location. Area 6 - This area is vegetated but does not contain any canopy trees. It is proposed to install 2 trees and 6 shrubs in this location that is greater than 6 feet tall. An area around the tree installation area shall be cleared of invasive species. Mowing around installed trees shall occur for 2 full growing seasons. Vegetation Planting Species Selection Trees: Red Maple (Acer rubrum), Shagbark Hickory (Carya ovata), American Elm (Ulmus americana), Cottonwood (Populus deltoides), and American Sycamore (Platanus occidentalis). Shrubs: Staghorn Sumac (Rhus typhina), Sweet Pepperbush (Clethra alnifolia), and Elderberry (Sambucus canadensis) Herbaceous Perennials: Common milkweed (Asclepias syriaca), Black-eyed Susan (Rudbeckia hirta), Brown-eyed Susan (Rudbeckia triloba)
Page 102
Location Map Scale: 1"=500' TOWN OF GRANBY SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING 215 Salmon Brook Street Granby, Connecticut Date: September 3, 2026 INLAND WETLANDS PERMIT SET Owner: Town of Granby 15 North Granby Road Granby, Connecticut 06035 Civil Engineer: Kevin Clark, PEL Town Engineer 15 North Granby Road Granby, Connecticut 06035 (860) 844-5318 townengineer@granby-ct.gov Surveyor: BSC Group 665 Winding Brook Drive Glastonbury, Connecticut 06033 (860) 652-8227 List of Drawings: - Sheet OA-1 Sheet C-1 to C-4 Sheet DE-1 to DE-3 Cover Overall Plan Plan Notes & Details Site
Page 103
N/F TOWN OF GRANBY 53 West Granby Road Vol. 94 Pg. 21 map G-42 /block 74 /lot 99 N/F TOWN OF GRANBY 53 West Granby Road Vol. 94 Pg. 21 map G-42 /block 74 /lot 99 Approximate Edge of Water Approximate Edge of Water Approximate Edge of Water Approximate Edge of Water West Branch Salmon Brook (PUBLIC VARIABLE WIDTH) WEST GRANBY ROAD (S.R. #20) West Branch Salmon Brook N/F Paul D. & Cathy A Biagini 51 West Granby Road Vol. 353 Pg. 1086 map G-42 /block 74 /lot 98 N/F Anthony Indino 47 West Granby Road Vol. 423 Pg. 809 Vol. 420 Pg. 175 map G-42 /block 74 /lot 96 N/F Thomas Randall Clay 45 West Granby Road Vol. 221 Pg. 951 Vol. 190 Pg. 789map G-42 /block 74 /lot 95 N/F William G. & Jonna L Hallam 49 West Granby Road Vol. 371 Pg. 1211 Vol. 349 Pg. 208 map G-42 /block 74 /lot 97 N/F TOWN OF GRANBY 215 Salmon Brook Street Vol. 74 Pg. 176 map H-42 /block 74 /lot 87 101 38E 29A 38C 29A 38E 38C 100 101 Approximate Edge of Water Approximate Edge of WaterWest Branch Salmon Brook EXIST. SOIL LINE EXIST. PROP. LINE INLAND WETLANDS REGULATED AREA MATCH MARK MATCH MARK MATCH MARK MATCH MARK MATCH MARK MATCH MARK AREA 1 AREA 1 AREA 2 AREA 3 AREA 5 AREA 4 GRANBY TOWN HALL 15 NORTH GRANBY ROAD GRANBY, CONNECTICUT 06035 PHONE: (860) 844-5318 FAX: (860) 844-5325 TOWN OF GRANBY ENGINEERING DEPARTMENT SCALE:DATE:JOB #:SHEET: 1"=100'SEPTEMBER 3, 2026 2025.G01OA-1 OVERALL PLAN TOWN OF GRANBY SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING 215 SALMON BROOK STREET GRANBY, CONNECTICUT NO.DATEDESCRIPTION REVISIONS SHEET C-1 SHEET C-2 SHEET C-3 SHEET C-4 UTILITY WARNING The locations of existing underground utilities are shown in an approximate way only and have not been independently verified by the Owner or its representative. Utilities not shown on this plan may exist. The Contractor shall determine the exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages which might be occasioned by the Contractor's failure to exactly locate and preserve any and all underground utilities. The Contractor shall use CALL BEFORE YOU DIG, 811, https://www.cbyd.com/, prior to any construction activity.
Page 104
100 101 PROP. 5-FT WIDE HMA WALK SIDEWALK BASE LINE 10 0+0184.96 2+00G.B. 185.41 3+00G.B. 186.08 4+00G.B. 187.17 EXIST. SIDEWALK PROP. PARK BENCHW/CONC. SLAB APPROX. GRADING LIMIT WALKCROSSSLOPE MATCH MARK MATCH MARK PROP. CONC.SIDEWALK RAMP5-FT LONG 0+05 END CONC. RAMPEL=185.06 0+50G.B. 184.95 C 9 L 30 L 31 C 10 L 32 C 11 L 33 SF SF SF SF SF SF SF PROP. SOIL STOCKPILE AREA SF SF SF SF SF SF SF C.E. SEDIMENT & EROSION CONTROL MEASURES MEASUREPLAN KEY CONSTRUCTION ENTRANCECE DUST CONTROLDC EROSION CONTROL MATTINGECM GEOTEXTILE SILT FENCEGSF HAY BALE BARRIERHB INLET PROTECTIONIP LAND GRADINGLG LANDSCAPE MULCHLM LANDSCAPE PLANTINGLP MULCH FOR SEEDMS OUTLET PROTECTIONOP PERMANENT LINED WATERWAYPW PERMANENT SEEDINGPS PERMANENT TURF REINFORCEMENT MAT TRM RIP RAPRR SEDIMENT CONTROL LOGSCL STONE CHECK DAMSCD STONE SLOPE PROTECTIONSSP SURFACE ROUGHENINGSR TOPSOILINGTO LIST OF ABBREVIATIONS: BIT. CONC. BITUMINOUS CONCRETE C.B.CATCH BASIN CONC.CONCRETE C.P.E.P.-SCORRUGATED POLYETHYLENE PIPE, W/SMOOTH INTERIOR EXIST.EXISTING G.BGRADE BREAK INV. INVERT L.F.LINEAR FEET M.H.MANHOLE PVMT.PAVEMENT P.V.P.POLYVINYL CHLORIDE PROP.PROPOSED TYP.TYPICAL LEGEND UTILITY POLE WETLANDS BUILDING SETBACK LINE PROPERTY LINE PROPOSED SPOT GRADE CATCH BASIN MANHOLE EASEMENT CONTOUR STORM SEWER CURB SFSFSFSILT FENCE PROPOSED TYPICAL EXISTING TYP.PROP. UPLAND REVIEW AREA SLSLSEDIMENT CONTROL LOG SOIL BOUNDARY & TYPE EXIST. TREE TO BE REMOVED 43B CONTRACT LIMIT LINE 4+80G.B. 229.4 GRANBY TOWN HALL 15 NORTH GRANBY ROAD GRANBY, CONNECTICUT 06035 PHONE: (860) 844-5318 FAX: (860) 844-5325 TOWN OF GRANBY ENGINEERING DEPARTMENT SCALE:DATE:JOB #:SHEET: 1"=20'SEPTEMBER 3, 2026 2025.G01C-1 PLAN TOWN OF GRANBY SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING 215 SALMON BROOK STREET GRANBY, CONNECTICUT NO.DATEDESCRIPTION REVISIONS UTILITY WARNING The locations of existing underground utilities are shown in an approximate way only and have not been independently verified by the Owner or its representative. Utilities not shown on this plan may exist. The Contractor shall determine the exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages which might be occasioned by the Contractor's failure to exactly locate and preserve any and all underground utilities. The Contractor shall use CALL BEFORE YOU DIG, 811, https://www.cbyd.com/, prior to any construction activity.
Page 105
Approximate Edge of Water Approximate Edge of Water West Branch Salmon Brook N/F TOWN OF GRANBY 215 Salmon Brook Street Vol. 74 Pg. 176 map H-42 /block 74 /lot 87 DEMO EXIST. TREE (TYP.) PROP. 5-FT WIDE HMA WALK SIDEWALK BASE LINE 10 DEMO EXIST. TREE (TYP.) 4+00G.B. 187.17 5+00G.B. 188.19 5+50G.B. 188.15 6+00G.B. 188.59 6+70G.B. 190.28 8+50G.B. 189.71 PROP. PARK BENCHW/CONC. SLAB INLAND WETLANDS REGULATED AREA APPROX. GRADING LIMIT WALKCROSSSLOPE MATCH MARK MATCH MARK MATCH MARK MATCH MARK C 11 L 33 C 12 L 34 L 35 C 13 L 36 AREA 1 AREA 2 AREA 3 AREA 5 AREA 4 PROP. WETLANDSMITIGATION AREA (TYP.) SEDIMENT & EROSION CONTROL MEASURES MEASUREPLAN KEY CONSTRUCTION ENTRANCECE DUST CONTROLDC EROSION CONTROL MATTINGECM GEOTEXTILE SILT FENCEGSF HAY BALE BARRIERHB INLET PROTECTIONIP LAND GRADINGLG LANDSCAPE MULCHLM LANDSCAPE PLANTINGLP MULCH FOR SEEDMS OUTLET PROTECTIONOP PERMANENT LINED WATERWAYPW PERMANENT SEEDINGPS PERMANENT TURF REINFORCEMENT MAT TRM RIP RAPRR SEDIMENT CONTROL LOGSCL STONE CHECK DAMSCD STONE SLOPE PROTECTIONSSP SURFACE ROUGHENINGSR TOPSOILINGTO LIST OF ABBREVIATIONS: BIT. CONC. BITUMINOUS CONCRETE C.B.CATCH BASIN CONC.CONCRETE C.P.E.P.-SCORRUGATED POLYETHYLENE PIPE, W/SMOOTH INTERIOR EXIST.EXISTING G.BGRADE BREAK INV. INVERT L.F.LINEAR FEET M.H.MANHOLE PVMT.PAVEMENT P.V.P.POLYVINYL CHLORIDE PROP.PROPOSED TYP.TYPICAL LEGEND UTILITY POLE WETLANDS BUILDING SETBACK LINE PROPERTY LINE PROPOSED SPOT GRADE CATCH BASIN MANHOLE EASEMENT CONTOUR STORM SEWER CURB SFSFSFSILT FENCE PROPOSED TYPICAL EXISTING TYP.PROP. UPLAND REVIEW AREA SLSLSEDIMENT CONTROL LOG SOIL BOUNDARY & TYPE EXIST. TREE TO BE REMOVED 43B CONTRACT LIMIT LINE 4+80G.B. 229.4 GRANBY TOWN HALL 15 NORTH GRANBY ROAD GRANBY, CONNECTICUT 06035 PHONE: (860) 844-5318 FAX: (860) 844-5325 TOWN OF GRANBY ENGINEERING DEPARTMENT SCALE:DATE:JOB #:SHEET: 1"=20'SEPTEMBER 3, 2026 2025.G01C-2 PLAN TOWN OF GRANBY SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING 215 SALMON BROOK STREET GRANBY, CONNECTICUT NO.DATEDESCRIPTION REVISIONS UTILITY WARNING The locations of existing underground utilities are shown in an approximate way only and have not been independently verified by the Owner or its representative. Utilities not shown on this plan may exist. The Contractor shall determine the exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages which might be occasioned by the Contractor's failure to exactly locate and preserve any and all underground utilities. The Contractor shall use CALL BEFORE YOU DIG, 811, https://www.cbyd.com/, prior to any construction activity.
Page 106
N/F TOWN OF GRANBY 53 West Granby Road Vol. 94 Pg. 21 map G-42 /block 74 /lot 99 101 Approximate Edge of Water Approximate Edge of WaterWest Branch Salmon Brook 0+00 1+00 PC: 0+69.48 PT: 0+82.32 PROP. 5-FT WIDE HMA WALK SIDEWALK BASE LINE 10 L 9 C 8 EXIST. PATH TO BE REBUILT TO 6-FT WIDE WOODS TRAIL SIDEWALK BASE LINE 11 9+50G.B. 190.30 10+50G.B. 190.30 11+50G.B. 189.67 12+20G.B. 190.41 13+00G.B. 190.57 14+00G.B. 190.33 END 15+14190.91 PROP. PARK BENCHW/CONC. SLAB APPROX. GRADING LIMIT WALKCROSSSLOPE MATCH MARK MATCH MARK APPROX. LOCATION OFPROP. HORSE PATHCLEAR 5-FT WIDE PATH MATCH MARK MATCH MARK C 14 L 37 C 15 L 38 PROP. SOIL STOCKPILE AREA SF SF SF SF SF SF SF SF SF SF AREA 1 SL PROP. WETLANDSMITIGATION AREA (TYP.) SEDIMENT & EROSION CONTROL MEASURES MEASUREPLAN KEY CONSTRUCTION ENTRANCECE DUST CONTROLDC EROSION CONTROL MATTINGECM GEOTEXTILE SILT FENCEGSF HAY BALE BARRIERHB INLET PROTECTIONIP LAND GRADINGLG LANDSCAPE MULCHLM LANDSCAPE PLANTINGLP MULCH FOR SEEDMS OUTLET PROTECTIONOP PERMANENT LINED WATERWAYPW PERMANENT SEEDINGPS PERMANENT TURF REINFORCEMENT MAT TRM RIP RAPRR SEDIMENT CONTROL LOGSCL STONE CHECK DAMSCD STONE SLOPE PROTECTIONSSP SURFACE ROUGHENINGSR TOPSOILINGTO LIST OF ABBREVIATIONS: BIT. CONC. BITUMINOUS CONCRETE C.B.CATCH BASIN CONC.CONCRETE C.P.E.P.-SCORRUGATED POLYETHYLENE PIPE, W/SMOOTH INTERIOR EXIST.EXISTING G.BGRADE BREAK INV. INVERT L.F.LINEAR FEET M.H.MANHOLE PVMT.PAVEMENT P.V.P.POLYVINYL CHLORIDE PROP.PROPOSED TYP.TYPICAL LEGEND UTILITY POLE WETLANDS BUILDING SETBACK LINE PROPERTY LINE PROPOSED SPOT GRADE CATCH BASIN MANHOLE EASEMENT CONTOUR STORM SEWER CURB SFSFSFSILT FENCE PROPOSED TYPICAL EXISTING TYP.PROP. UPLAND REVIEW AREA SLSLSEDIMENT CONTROL LOG SOIL BOUNDARY & TYPE EXIST. TREE TO BE REMOVED 43B CONTRACT LIMIT LINE 4+80G.B. 229.4 GRANBY TOWN HALL 15 NORTH GRANBY ROAD GRANBY, CONNECTICUT 06035 PHONE: (860) 844-5318 FAX: (860) 844-5325 TOWN OF GRANBY ENGINEERING DEPARTMENT SCALE:DATE:JOB #:SHEET: 1"=20'SEPTEMBER 3, 2026 2025.G01C-3 PLAN TOWN OF GRANBY SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING 215 SALMON BROOK STREET GRANBY, CONNECTICUT NO.DATEDESCRIPTION REVISIONS UTILITY WARNING The locations of existing underground utilities are shown in an approximate way only and have not been independently verified by the Owner or its representative. Utilities not shown on this plan may exist. The Contractor shall determine the exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages which might be occasioned by the Contractor's failure to exactly locate and preserve any and all underground utilities. The Contractor shall use CALL BEFORE YOU DIG, 811, https://www.cbyd.com/, prior to any construction activity.
Page 107
N/F TOWN OF GRANBY 53 West Granby Road Vol. 94 Pg. 21 map G-42 /block 74 /lot 99 Approximate Edge of Water Approximate Edge of Water EXISTINGRESIDENCE West Branch Salmon Brook (PUBLIC VARIABLE WIDTH) WEST GRANBY ROAD (S.R. #20) 38E 29A 38C 6+31 2+00 3+00 4+00 5+00 6+00 PI: 1+28.88 PI: 1+84.69 PI: 2+10.01 PI: 2+39.46 PI: 2+59.36 PI: 2+79.09 PI: 3+01.49 PI: 3+48.89 PI: 3+99.15 PI: 4+32.03 PI: 4+59.93 PI: 4+81.23 PI: 5+07.56 PI: 5+31.98 PI: 5+69.40 PI: 5+96.97 2+30B.S. 196.29 2+41.70T.S. 203.22 2+69.87B.S. 204.38 2+81.57T.S. 211.31 4+98.50G.B. 229.52 L 10 L 11 L 12 L 13 L 14 L 15 L 17 L 18 L 19 L 20 L 21 L 22 L 23 L 24 L 25 L 26 3+29.74B.S. 213.46 3+36.76T.S. 217.87 394.93B.S. 220.03 3+91.95T.S. 224.44 L 16 1+30G.B. 191.29 PROP. OVERLAPPING TIMBER STEPS7 RISERS, OVERALL LENGTH =12-FT APPROX. GRADING LIMIT PROP. OVERLAPPING TIMBER STEPS7 RISERS, OVERALL LENGTH = 12-FT PROP. OVERLAPPING TIMBER STEPS11 RISERS, OVERALL LENGTH = 16'-8" PROP. OVERLAPPING TIMBER STEPS11 RISERS, OVERALL LENGTH = 16'-8" APPROX. LOCATION OFEXIST. HORSE PATH APPROX. LOCATION OFPROP. HORSE PATHCLEAR 5-FT WIDE PATH MATCH MARK MATCH MARK SL SL SL SL SL SL ECM (TYP.) SL SEDIMENT & EROSION CONTROL MEASURES MEASUREPLAN KEY CONSTRUCTION ENTRANCECE DUST CONTROLDC EROSION CONTROL MATTINGECM GEOTEXTILE SILT FENCEGSF HAY BALE BARRIERHB INLET PROTECTIONIP LAND GRADINGLG LANDSCAPE MULCHLM LANDSCAPE PLANTINGLP MULCH FOR SEEDMS OUTLET PROTECTIONOP PERMANENT LINED WATERWAYPW PERMANENT SEEDINGPS PERMANENT TURF REINFORCEMENT MAT TRM RIP RAPRR SEDIMENT CONTROL LOGSCL STONE CHECK DAMSCD STONE SLOPE PROTECTIONSSP SURFACE ROUGHENINGSR TOPSOILINGTO LIST OF ABBREVIATIONS: BIT. CONC. BITUMINOUS CONCRETE C.B.CATCH BASIN CONC.CONCRETE C.P.E.P.-SCORRUGATED POLYETHYLENE PIPE, W/SMOOTH INTERIOR EXIST.EXISTING G.BGRADE BREAK INV. INVERT L.F.LINEAR FEET M.H.MANHOLE PVMT.PAVEMENT P.V.P.POLYVINYL CHLORIDE PROP.PROPOSED TYP.TYPICAL LEGEND UTILITY POLE WETLANDS BUILDING SETBACK LINE PROPERTY LINE PROPOSED SPOT GRADE CATCH BASIN MANHOLE EASEMENT CONTOUR STORM SEWER CURB SFSFSFSILT FENCE PROPOSED TYPICAL EXISTING TYP.PROP. UPLAND REVIEW AREA SLSLSEDIMENT CONTROL LOG SOIL BOUNDARY & TYPE EXIST. TREE TO BE REMOVED 43B CONTRACT LIMIT LINE 4+80G.B. 229.4 GRANBY TOWN HALL 15 NORTH GRANBY ROAD GRANBY, CONNECTICUT 06035 PHONE: (860) 844-5318 FAX: (860) 844-5325 TOWN OF GRANBY ENGINEERING DEPARTMENT SCALE:DATE:JOB #:SHEET: 1"=20'SEPTEMBER 3, 2026 2025.G01C-4 PLAN TOWN OF GRANBY SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING 215 SALMON BROOK STREET GRANBY, CONNECTICUT NO.DATEDESCRIPTION REVISIONS UTILITY WARNING The locations of existing underground utilities are shown in an approximate way only and have not been independently verified by the Owner or its representative. Utilities not shown on this plan may exist. The Contractor shall determine the exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages which might be occasioned by the Contractor's failure to exactly locate and preserve any and all underground utilities. The Contractor shall use CALL BEFORE YOU DIG, 811, https://www.cbyd.com/, prior to any construction activity.
Page 108
SIDEWALK BASELINE #10 & PORTION OF #11 @ EDGE OF WALK DIRECTION OF SLOPE AS NOTED, 1.5% TYP. 2.0% MAX. (NOT TO SCALE) BITUMINOUS CONCRETE SIDEWALK DETAIL 2" HMA S0.375(TRAFFIC LEVEL 1) 8" GRANULAR FILL COMPACTED IN TWO LIFTS WIDTH = 5'-0" 3" (TYP.) COMPACTED SUBGRADE (NOT TO SCALE) WOODS TRAIL/STONE DUST PATH DETAIL 3" COMPACTED AASHTO #10 STONE DUST 4" COMPACTED N0. 4 STONE AGGREGATE WIDTH = 6'-0" 3" (TYP.) COMPACTED SUBGRADE PLAN AA B B 2'-0" 8'-0" 3'-0" 6'-1/8" 5'-0" 11'-0" ATTACH BENCH TO SLAB W/ 4 - 3/8" x 3-1/2" CONCRETE EXPANSION ANCHOR BOLTS 1'-0" 2'-0" SECTION B-B BENCH NOTES: 1. BENCH TO BE A EVEREST SERIES 8-FT. PARK BENCH WITH BACK - SURFACE MOUNT MODEL 595-6002 AS MANUFACTURED BY HIGHLAND PRODUCTS GROUP/THE PARK CATALOG, 931 VILLAGE BLVD STE 905-354, WEST PALM BEACH, FL 33409, OR EQUIVALENT 2. SLAB TO BE CONSTRUCTED AS A CONC. WALK CONFORMING TO FORM 818. BENCH EDGE OF SIDEWALK MATCH GRADE BIT. SIDEWALK (NOT TO SCALE) PARK BENCH W/CONCRETE SLAB SECTION A-A SLOPE = 1.5% 1 2" EXPANSION JOINT WITH PRE-MOLDED EXPANSION JOINT MATERIAL 5 8" x 12" LONG SMOOTH, STEEL DOWEL 1' O/C - FREE AT ONE END CLASS "C" CONCRETE SURFACE FINISHED WITH A WOOD FLOAT OR BY OTHER APPROVED MEANS 1 2" EXPANSION JOINT WITH PRE-MOLDED EXPANSION JOINT MATERIAL CONC. SLAB 5" 8" AFTER COMPACTION GRANULAR FILL PLACED IN TWO COURSES. COMPACTED SUBGRADE 1 2" EXPANSION JOINT WITH PRE-MOLDED EXPANSION JOINT MATERIAL EXPANSION JOINT PLAN EDGE OF PAVEMENT SIDEWALK 4" 6" COMPACTED SUBGRADE GRANULAR FILL PLACED IN TWO COURSES. 6" x 6" #10 W.W.M. A A 2' DETECTABLE WARNING SIDEWALK WIDTH AS NOTED (5' MIN.) SLOPE ADJACENT LAWN/LANDSCAPED AREA AS NECESSARY TO MEET THE EDGE OF THE RAMP CONCRETE RAMP SLOPE DOWN TO PAVEMENT. RAMP SLOPE TO BE 2.0%. RAMP SURFACE TO BE BROOM FINISH PERPENDICULAR TO DIRECTION OF TRAVEL. 5'-0" EXIST. ROAD PAVEMENT CLASS 'F' CONCRETE SLOPE 1/4" PER FOOT ELEVATION AT GUTTER SHALL BE FLUSH WITH ROADWAY PAVEMENT 2' DETECTABLE WARNING SECTION A-A CONCRETE WALK RAMP DETAIL - W/NO EXIST. CURB AT PAVEMENT (NOT TO SCALE) OVERLAPPING TIMBER STEP DETAIL ADDITIONAL NOTES: 1. TIMBER TO BE 8" X 8", #2 GROUND CONTACT ROUGH SAWN PRESSURE TREATED LUMBER. 2. RISERS TO BE 7-1/2". TREADS TO BE 14" 3. TIMBERS TO BE SET ON A 4-INCH COMPACTED STONE (CTDOT NO. 4) BASE. 4. TREAD INFILL BETWEEN THE RISERS TO BE AASHTO #10 STONE DUST. NO.DATEDESCRIPTION REVISIONS 8/16/24 PER CTDOT COMMENTSGRANBY TOWN HALL 15 NORTH GRANBY ROAD GRANBY, CONNECTICUT 06035 PHONE: (860) 844-5318 FAX: (860) 844-5325 TOWN OF GRANBY ENGINEERING DEPARTMENT SCALE:DATE:JOB #:SHEET: 1"=20'SEPTEMBER 3, 2026 2025.G01DE-1 DETAILS & NOTES TOWN OF GRANBY SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING 215 SALMON BROOK STREET GRANBY, CONNECTICUT
Page 109
(NOT TO SCALE) SILT FENCE DETAIL (GSF) SLOPE 6"x6" TRENCH. REPLACE AND COMPACT WITH EXCAVATED MATERIAL 12" (MIN.) 30" (MIN.) PREFABRICATED SEDIMENT FENCE. U.S. SILT & SITE SUPPLY/GETSCO CT36112130 OR EQUIVALENT (NOT TO SCALE) SEDIMENT LOG DETAIL (ON BARE SOIL)DOWN SLOPE NOTES: 1. CURLEX SEDIMENT LOGS AS MANUFACTURED BY AMERICAN EXCELSIOR COMPANY. SEDIMENT LOG SIZE TO BE 9-INCHES UNLESS OTHERWISE NOTED ON THE PLANS. 2. TRENCH OPTION IS MOST APPLICABLE IN LOOSE, UNCONSOLIDATED SOILS. 3. STAKE SIZE: 1 1 8" X 1 1 8" X 30" WOODEN STAKES ARE RECOMMENDED FOR 6", 9", AND 12" SEDIMENT LOGS. 1 1 8" X 1 1 8" X 48" WOODEN STAKES ARE RECOMMENDED FOR 20" SEDIMENT LOGS. 4. INSTALLATION TO BE AS PER THE MANUFACTURERS INSTRUCTIONS. 16" (MIN.) CURLEX ®SEDIMENT LOGS WOOD STAKE WOOD STAKE TO ONLY PENETRATE NETTING, NOT CURLEX ®MATERIAL SLOPE SURFACE PLANTING DETAIL NOTE: PRUNE LOWER BRANCHES OF TREE BACK TO MAIN TRUNK SO THAT REMAINING HEAD IS APPROX. 1/2 OF TOTAL TREE HEIGHT 2xBALL RADIUS 1'± MULCH EDGE STAKING AND PLANTING TREE WRAP TRUNK OF TREE WITH STANDARD TREE WRAPPING PAPER (CRAPE) STARTING FROM BOTTOM WINDING UPWARDS UNTIE BALLING STRING FROM BASE OF TRUNK ALLOW THIN LAYER OF SOIL TO COVER BALL DEPRESSION FOR WATER ACCUMULATION BERM SIZE TO BE PROMINENT COMPACT OUTER EDGE WITH FOOTPRINT GROUND TREATED STAKES (3 STAKES SPACED EQUIDISTANT) PEEL BACK BURLAP BACKFILL WITH 4 PARTS TOPSOIL, 1 PART PEAT & 1 PART MANURE RUBBER HOSE AT CONTACT POINTS 6" (MIN.) (NOT TO SCALE) CONSTRUCTION ENTRANCE DETAIL (CE) LENGTH = AS SHOWN ON PLAN (MIN.=30') WIDTH = AS SHOWN ON PLAN (MIN. =12') REMOVE TOPSOIL & ORGANICS PRIOR TO PLACING GEOTEXTILE & STONE CONNDOT N0. 3 CRUSHED GRAVEL GEOTEXTILE PAVED ROAD OR DRIVE NO.DATEDESCRIPTION REVISIONS GRANBY TOWN HALL 15 NORTH GRANBY ROAD GRANBY, CONNECTICUT 06035 PHONE: (860) 844-5318 FAX: (860) 844-5325 TOWN OF GRANBY ENGINEERING DEPARTMENT SCALE:DATE:JOB #:SHEET: 1"=20'SEPTEMBER 3, 2026 2025.G01DE-2 DETAILS & NOTES TOWN OF GRANBY SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING 215 SALMON BROOK STREET GRANBY, CONNECTICUT
Page 110
GENERAL EROSION AND SEDIMENT CONTROL NOTES: 1. EROSION AND SEDIMENT CONTROL MEASURES SHALL CONFORM TO, "CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL, THE COUNCIL ON SOIL AND WATER CONSERVATION, ADOPTED MARCH 30, 2024," AS AMENDED. 2. THE SEDIMENT AND EROSION CONTROL NOTES AND DETAILS INCLUDED IN THE CONSTRUCTION DOCUMENTS MAY REFER TO INFORMATION LOCATED IN THE GUIDELINES. THE CONTRACTOR SHALL HAVE A COPY OF THE GUIDELINES AVAILABLE FOR REFERENCE DURING CONSTRUCTION. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION, MAINTENANCE, AND REMOVAL OF ALL SEDIMENTATION AND EROSION CONTROL MEASURES. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING THE NEARBY STREETS OF ANY SEDIMENT OR CONSTRUCTION DEBRIS ORIGINATING FROM THIS PROJECT. 5. IF EXCESS MATERIAL FROM THE PROPOSED CONSTRUCTION IS TO BE REMOVED FROM THE SITE, THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS FOR ITS DEPOSITION. 6. THE CONSTRUCTION ENTRANCE, IF NOTED, AND THE SEDIMENT CONTROLS LOCATED AT THE PERIMETER OF THE PROPOSED EDGE OF DISTURBANCE(S), SHALL BE INSTALLED PRIOR TO ANY CONSTRUCTION ACTIVITY. INSTALLATION SHALL BE AS PER THE MANUFACTURERS' INSTRUCTIONS AND AS DETAILED ON THESE PLANS. 7. ALL STORM DRAINAGE INLETS ARE TO BE PROTECTED FROM SEDIMENT INTRUSION. SEDIMENT SHALL BE REMOVED FROM ALL DRAINAGE STRUCTURES, PIPE SYSTEMS, OUTLET STRUCTURES, RIP RAP, AND CHANNELS. 8. ALL STOCKPILES OF SOIL ARE TO BE ENCIRCLED WITH SILT FENCE. 9. THE CONTRACTOR SHALL EMPLOY TEMPORARY EROSION CONTROL MEASURES SUCH AS, SILT FENCE, HAY BALES, STONE BARRIERS, EROSION CONTROL MATTING, SEDIMENT TRAPS, DEWATERING BASINS, AND TEMPORARY STORMWATER DIVERSIONS, AS NECESSARY DURING CONSTRUCTION, TO PROTECT THE SITE AND ADJACENT PROPERTIES FROM EROSION. 10. ALL LOCATIONS, INCLUDING SWALES, LAWN AREAS, AND STORM SEWER DISCHARGE POINTS, THAT ARE TO RECEIVE A CONCENTRATED FLOW OF STORMWATER, ORIGINATING FROM SURFACE FLOW OR STORM SEWER SYSTEMS, SHALL BE STABILIZED AND PROTECTED FROM EROSION PRIOR TO RECEIVING THE WATER. 11. DAMAGED SECTIONS OF SEDIMENT BARRIERS SHALL BE REPLACED BY THE CONTRACTOR. SEDIMENT DEPOSITS SHALL BE REMOVED BY THE CONTRACTOR WHEN THEY REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIER. SEDIMENT SHALL BE REMOVED IN A MANNER THAT DOES NOT CAUSE ADDITIONAL EROSION OR POLLUTION. 12. AT A MINIMUM, ALL SEDIMENT CONTROL MEASURES SHALL BE INSPECTED BY THE CONTRACTOR AT LEAST ONCE A WEEK AND WITHIN 24 HOURS OF THE END OF A STORM WITH A RAINFALL AMOUNT OF 0.5 INCHES OR GREATER. REPAIR SEDIMENT CONTROL MEASURE AS NECESSARY. 13. DISTURBED AREAS ARE TO BE STABILIZED AS SOON AS POSSIBLE AFTER DISTURBANCE. WHEN GRADING OF THE DISTURBED AREA WILL BE SUSPENDED FOR A PERIOD OF 30 OR MORE CONSECUTIVE DAYS, BUT LESS THAN 5 MONTHS, STABILIZE THE SITE WITHIN 7 DAYS OF THE SUSPENSION OF GRADING THROUGH THE USE OF MULCH OR OTHER MATERIALS APPROPRIATE FOR USE AS A TEMPORARY SOIL PROTECTOR. FOR SURFACES THAT ARE NOT TO BE REWORKED WITHIN 5 MONTHS BUT WILL BE REWORKED WITHIN 1 YEAR, USE TEMPORARY SEEDING, MULCH FOR SEED OR WHEN SLOPES ARE LESS THAN 3:1, WOOD CHIPS, BARK CHIPS OR SHREDDED BARK. FOR SURFACES THAT ARE TO BE REWORKED AFTER 1 YEAR, USE PERMANENT SEEDING AND MULCH FOR SEED. 14. EXCAVATED STUMPS AND CUT TREES ARE TO BE CHIPPED AND STOCKPILED FOR FUTURE USE, OR REMOVED TO AN OFF-SITE DISPOSAL AREA. BRUSH AND SLASH ARE TO BE CHIPPED AND STOCKPILE FOR FUTURE USE OR REMOVED FROM THE SITE. EXCAVATED STUMPS, CUT TREES, BRUSH, AND SLASH, ARE NOT TO BE BURIED ON-SITE. LAND GRADING (LG) DESIGN CRITERIA SLOPE DEFINED SLOPE IS THE RELATIONSHIP OF HORIZONTAL DISTANCE TO VERTICAL DISTANCE AND IS REFERENCED AS EITHER HORIZONTAL TO VERTICAL, A RATIO OF HORIZONTAL:VERTICAL OR A PERCENTAGE OF THE VERTICAL DIVIDED BY THE HORIZONTAL. SLOPE GRADIENT LIMITATIONS VEGETATED MOWED SLOPES: WHERE A SLOPE IS TO BE VEGETATED AND MOWED, THE SLOPE SHALL NOT BE STEEPER THAN 3:1; FLATTER SLOPES ARE PREFERRED BECAUSE OF SAFETY FACTORS RELATED TO THE OPERATION OF EQUIPMENT. VEGETATED UNMOWED SLOPES: WHERE A SLOPE IS TO BE VEGETATED BUT NOT MOWED, THE SLOPE SHALL NOT BE STEEPER THAN 2:1. STRUCTURALLY STABILIZED SLOPES: FOR SLOPES STEEPER THAN 2: 1OR WHEN SLOPES ARE STEEPER THAN 3: 1 AND THE CHANGE IN ELEVATION EXCEEDS 15 FEET WITHOUT A CROSS SLOPE BENCH, ENGINEERED STRUCTURAL DESIGN FEATURES SHALL BE INCORPORATED. APPLICABLE ENGINEERED MEASURES MAY INCLUDE THOSE FOUND IN THE STABILIZATION STRUCTURES FUNCTIONAL GROUP (SEE FIGURE 3-4, SELECTION MATRIX) OR OTHER STRUCTURAL MEASURES DESIGNED BY THE ENGINEER, EXCEPTIONS: SLOPE LIMITATIONS MAY BE INCREASED PROVIDING DETAILED SOIL MECHANICS ANALYSIS CALCULATIONS ARE PERFORMED WHICH CONFIRM AN ACCEPTABLE SAFETY FACTOR FOR THE FINISHED SLOPE. SLOPE LENGTH LIMITATIONS AND REVERSE SLOPE BENCHES REVERSE SLOPE BENCHES ARE REQUIRED WHENEVER THE VERTICAL HEIGHT OF ANY SLOPE STEEPER THAN 3:1 EXCEEDS 15 FEET, EXCEPT WHEN ENGINEERED SLOPE STABILIZATION STRUCTURES MEASURES ARE INCLUDED IN THE SLOPE AND/OR A DETAILED SOIL MECHANICS ANALYSIS CALCULATION HAS CONFIRMED AN ACCEPTABLE FACTOR OF SAFETY EXISTS FOR THE FINISHED SLOPE. CONTROLLING WATER MOVEMENT MAKE PROVISIONS TO SAFELY CONDUCT SURFACE RUNOFF TO STORM DRAINS, PROTECTED OUTLETS OR TO STABLE WATERCOURSES TO ENSURE THAT RUNOFF WILL NOT DAMAGE SLOPES OR OTHER GRADED AREAS. SURFACE WATER: MAXIMUM ALLOWABLE OVERLAND FLOW DISTANCE IN FEET TO THE TOP OF THE DESIGNED SLOPE WITH NO DIVERSION OF SURFACE WATER IS DETERMINED BY USE OF THE FORMULA: A=X (15-Y) A = MAXIMUM OVERLAND FLOW DISTANCE IN FEET ABOVE THE CREST OF THE DESIGNED SLOPE B = MAXIMUM HORIZONTAL DISTANCE IN FEET SHALL NOT EXCEED 15X. X = SIDE SLOPE; HORIZONTAL DISTANCE IN FEET TO ONE FOOT VERTICAL (E.G., = 2 FOR DESIGNED SLOPE 2:1) Y = HEIGHT OF DESIGNED SLOPE IN FEET MEASURED VERTICALLY FROM TOE ELEVATION OF THE DESIGNED SLOPE TO TOP OF CUT OR FILL FOR THE DESIGNED SLOPE. EITHER DIVERT SURFACE WATER FROM THE FACE OF ALL CUT AND FILL SLOPES BY THE USE OF DIVERSIONS, DITCHES AND DRAINAGE WAYS OR OTHERWISE CONVEY IT DOWN THE SLOPE BY THE USE OF OTHER APPROPRIATE MEASURES. SURFACE WATER MAY BE ALLOWED TO FLOW DOWN CUT AND FILL SLOPES WHEN ALL OF THE FOLLOWING CONDITIONS EXIST: ·THE LENGTH OF OVERLAND FLOW (IN FEET) TO THE CREST OF THE DESIGNED SLOPE DOES NOT EXCEED THE DISTANCE "A"; ·THE FACE OF THE SLOPE IS ALREADY STABLE OR THE FACE OF THE SLOPE IS PROTECTED FROM SURFACE RUNOFF UNTIL IT IS STABILIZED; ·THE FACE OF THE SLOPE IS NOT SUBJECTED TO ANY CONCENTRATED FLOWS OF SURFACE WATER FROM NATURAL DRAINAGE WAYS AND STRUCTURES SUCH AS GRADED DRAINAGE WAYS AND DOWNSPOUTS; AND ·THE MAXIMUM TOTAL HORIZONTAL OVERLAND FLOW (A) PLUS SLOPE DISTANCE (B) DOES NOT EXCEED 15 TIMES THE SIDE SLOPE (X) OF THE CUT OR FILL SLOPES. SUBSURFACE WATER: SUBSURFACE DRAINAGE SHALL BE PROVIDED WHERE NECESSARY TO INTERCEPT GROUNDWATER SEEPAGE THAT WOULD OTHERWISE ADVERSELY AFFECT SLOPE STABILITY OR CREATE EXCESSIVELY WET SITE CONDITIONS THAT WOULD HINDER OR PROHIBIT DESIRED VEGETATIVE GROWTH. OTHER DESIGN LIMITATIONS SLOPES SHALL NOT BE CREATED CLOSE TO PROPERTY LINES SO AS TO ENDANGER ADJOINING PROPERTIES WITHOUT ADEQUATELY PROTECTING SUCH PROPERTIES AGAINST EROSION, SEDIMENTATION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED DAMAGE. SOIL MATERIAL USED FOR EARTH FILL SHALL BE OBTAINED FROM AN APPROVED BORROW PIT OR OTHER DESIGNATED AREA. THE FILL MATERIAL SHALL BE FREE OF BRUSH, RUBBISH, LARGE ROCKS, LOGS, STUMPS, BUILDING DEBRIS, AND OTHER OBJECTIONABLE MATERIAL THAT WOULD INTERFERE WITH, OR PREVENT CONSTRUCTION OF, SATISFACTORY FILLS. IT SHOULD BE FREE OF STONES OVER 2 INCHES IN DIAMETER WHERE COMPACTED BY HAND OR MECHANICAL TAMPERS OR OVER 6 INCHES IN DIAMETER WHERE COMPACTED BY ROLLERS OR OTHER EQUIPMENT. FROZEN MATERIAL SHALL NOT BE PLACED IN THE FILL NOR SHALL THE FILL MATERIAL BE PLACED ON A FROZEN FOUNDATION. STOCKPILES, BORROW AREAS AND SPOIL AREAS SHALL BE LOCATED AWAY FROM STEEP SLOPES AND SURFACE WATERS AND SHALL BE SHOWN ON THE PLANS. SOIL STOCKPILES SHALL BE SUBJECT TO THE PROVISIONS OF THIS MEASURE. ALL DISTURBED AREAS SHALL BE STABILIZED IN ACCORDANCE WITH THE E&S MEASURES CONTAINED IN THESE GUIDELINES. INSTALLATION REQUIREMENTS 1. PROTECT ALL GRADED OR DISTURBED AREAS INCLUDING SLOPES DURING CLEARING AND CONSTRUCTION IN ACCORDANCE WITH THE APPROVED EROSION AND. SEDIMENT CONTROL PLAN UNTIL THEY ARE PERMANENTLY STABILIZED. 2. CONSTRUCT AND MAINTAIN ALL EROSION AND SEDIMENT CONTROLS IN ACCORDANCE WITH THE APPROVED EROSION AND SEDIMENT CONTROL PLAN. 3. CLEAR AND GRUB AREA TO BE GRADED. IN FILLED AREAS WHERE FILL EXCEEDS 5 FEET IN DEPTH, GRUBBING MAY NOT BE REQUIRED. 4. STRIP AND STOCKPILE TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION IN AMOUNTS NECESSARY TO COMPLETE FINISHED GRADING OF ALL EXPOSED AREAS. 5. USE ONLY FILL MATERIALS THAT ARE FREE OF BRUSH, RUBBISH, ROCKS, LOGS, STUMPS, BUILDING DEBRIS AND OTHER OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR PREVENT CONSTRUCTION OF SATISFACTORY FILLS. FROZEN MATERIAL OR SOFT, SATURATED OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE INCORPORATED INTO FILLS. ROCK FILL AND OTHER CLEAN FILL! MAY BE USED PROVIDING IT DOES NOT INTERFERE WITH THE CONSTRUCTION OF STRUCTURES. 6. PLACE AND COMPACT ALL FILL IN LAYERS NOT EXCEEDING 1 FOOT IN THICKNESS. NO EMBANKMENT LAYER SHALL BE DEPOSITED ON SURFACES OF SNOW OR ICE NOR SHALL IT BE PLACED ON FROZEN OR UNSTABLE SURFACES. WHERE EMBANKMENTS ARE TO BE CONSTRUCTED ON SLOPES STEEPER THAN 3:1, DEEPLY SCARIFY THE EXISTING SLOPE OR CUT INTO STEPS BEFORE FILLING IS BEGUN. IF FILL PLACEMENT IS NOT COMPLETED WITHIN 1 DAY, THEN INSTALL TEMPORARY EROSION AND SEDIMENT CONTROLS, SUCH AS TEMPORARY FILL BERM, AS NECESSARY TO REDIRECT RUNOFF WATER AWAY FROM THE UNSTABLE SLOPE UNTIL FILL PLACEMENT RESUMES. 7 COMPACT ALL FILLS AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. FILL THAT IS INTENDED TO SUPPORT BUILDINGS, STRUCTURES, CONDUITS AND OTHER FACILITIES SHALL BE COMPACTED IN ACCORDANCE WITH THE DESIGN SPECIFICATIONS. 8. PRIOR TO FINAL SEEDING, ROUGHEN SLOPES 2:1 THROUGH 5:1 TO REDUCE RUNOFF VELOCITIES UNLESS THE ENGINEER DIRECTS OTHERWISE. 9. IF AREAS ARE TO BE TOPSOILED, REFER TO THE TOPSOILING MEASURE (TO). 10. DURING ALL PHASES OF CONSTRUCTION KEEP REVERSE SLOPE BENCHES FREE OF SEDIMENT. 11. THE TREATMENT OF SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE REVIEWED AND ADDRESSED BY THE ENGINEER IN ACCORDANCE WITH GENERALLY ACCEPTED ENGINEERING STANDARDS. 12. APPLY PERMANENT SOIL STABILIZATION MEASURES TO ALL GRADED AREAS WITHIN 7 DAYS OF ESTABLISHING FINAL GRADE. IF FINAL GRADING IS TO BE DELAYED FOR MORE THAN 30 DAYS AFTER LAND DISTURBANCE ACTIVITIES CEASE, TEMPORARY SOIL STABILIZATION MEASURES (TSP) SHALL BE APPLIED IN ACCORDANCE WITH THE TEMPORARY SEEDING (TS) MEASURE. MAINTENANCE: INSPECT AND MAINTAIN ALL EROSION AND SEDIMENT MEASURES IMPLEMENTED DURING LAND GRADING OPERATIONS ACCORDING TO THEIR RESPECTIVE REQUIREMENTS. TOPSOILING (TO), TEMPORARY (TS) AND PERMANENT SEEDING (PS): 1. TOPSOILING, TEMPORARY AND PERMANENT SEEDING, AND MULCHING MEASURES SHALL CONFORM TO, "2002, CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL, THE CONNECTICUT COUNCIL ON SOIL AND WATER CONSERVATION," AS AMENDED. 2. PROVISIONS SHALL BE MADE FOR SURFACE AND SUBSURFACE DRAINAGE, AS NEEDED, AND FOR THE DISPOSAL OF RUNOFF WITHOUT CAUSING EROSION. 3. TOPSOIL SHALL INCLUSIVELY MEAN A SOIL: ·MEETING ONE OF THE FOLLOWING SOIL TEXTURAL CLASSES ESTABLISHED BY THE UNITED STATES DEPARTMENT OF AGRICULTURE CLASSIFICATION SYSTEM BASED UPON THE PROPORTION SAND, SILT, AND CLAY SIZE PARTICLES AFTER PASSING A 2 MILLIMETER (MM) SIEVE AND SUBJECTED TO A PARTICLE SIZE ANALYSIS: LOAMY SAND, INCLUDING COARSE, LOAMY FINE, AND LOAMY VERY FINE SAND, LOAMY SAND, INCLUDING COARSE, LOAMY FINE, AND LOAMY VERY FINE SAND, SANDY LOAM, INCLUDING COARSE, FINE AND VERY FINE SANDY LOAM, LOAM, OR SILT LOAM WITH NOT MORE THAN 60% SILT; ·CONTAINING NOT LESS THAN 6% AND NOT MORE THAN 20% ORGANIC MATTER AS DETERMINED BY LOSS-ON-IGNITION OF OVEN DRIED SAMPLES DRIED AT 105 DEGREES CENTIGRADE; ·POSSESSING A PH RANGE 6.0-7.5, EXCEPT IF THE VEGETATIVE PRACTICE BEING USED SPECIFICALLY REQUIRES A LOWER PH, THEN PH MAY BE ADJUSTED ACCORDING; ·HAVING SOLUBLE SALTS NOT EXCEEDING 500 PPM; AND ·THAT IS LOOSE AND FRIABLE AND FREE FROM REFUSE, STUMPS, ROOTS, BRUSH, WEEDS, FROZEN PARTICLES, ROCKS, AND STONES OVER 1.25 INCHES IN DIAMETER; AND ANY MATERIAL THAT WILL PREVENT THE FORMATION OF A SUITABLE SEEDBED OR PREVENT SEED GERMINATION AND PLANT GROWTH. TOPSOIL MAY BE OF NATURAL ORIGIN OR MANUFACTURED BY BLENDING COMPOSTED ORGANIC MATERIALS WITH ORGANIC DEFICIENT SOILS, MINERAL SOILS, SAND AND LIME SUCH THAT THE RESULTING SOIL MEETS THE MATERIAL SPECIFICATIONS LISTED ABOVE. ALL TOPSOIL SHALL BE ANALYZED BY A RECOGNIZED SOIL TESTING LABORATORY FOR ORGANIC CONTENT, PH AND SOLUBLE SALTS REQUIREMENTS GIVEN ABOVE. 4. PRIOR TO PLACING THE TOPSOIL, LOOSEN THE SUBGRADE BY DISCING OR SCARIFYING THE SURFACE TO A DEPTH OF TWO (2) INCHES. TOPSOIL SHALL BE APPLIED TO AT LEAST A MINIMUM COMPACTED DEPTH OF FOUR INCHES. COMPACTING IS TO INSURE A GOOD BOND WITH THE SUBGRADE AND TO OBTAIN A UNIFORM SEED BED. DO NOT OVER COMPACT. DO NOT APPLY TOPSOIL WHEN IN A FROZEN OR MUDDY CONDITION, OR WHEN THE SUBGRADE IS EXCESSIVELY WET. 5. SEEDBED PREPARATION: a. APPLY LIMESTONE AND FERTILIZER ACCORDING TO SOIL TESTS. IF SOIL TESTING IS NOT FEASIBLE, OR WHERE TIMING IS CRITICAL, FERTILIZER MAY BE APPLIED AT THE RATE OF 300 POUNDS PER ACRE USING 10-10-10 OR EQUIVALENT. IN ADDITION, 300 POUNDS OF 38-0-0 OR EQUIVALENT OF SLOW RELEASE NITROGEN MAY BE USED FOR TOP DRESSING. APPLY GROUND LIMESTONE AT THE RATE OF THREE (3) TONS PER ACRE. b. WORK LIME AND FERTILIZER INTO THE SOIL AS NEARLY AS PRACTICAL TO A DEPTH OF FOUR (4) INCHES WITH A DISK, SPRING TOOTH HARROW OR OTHER SUITABLE EQUIPMENT. THE FINAL HARROWING OR DISCING OPERATION SHOULD BE ON THE GENERAL CONTOUR. CONTINUE TILLAGE UNTIL A REASONABLY UNIFORM, FINE SEEDBED IS PREPARED. ALL BUT CLAY OR SILTY SOILS AND COARSE SANDS SHOULD BE ROLLED TO FIRM THE SEEDBED WHERE FEASIBLE. c. REMOVE FROM THE SURFACE ALL STONES TWO (2) INCHES OR LARGER IN ANY DIMENSION. REMOVE ALL OTHER DEBRIS SUCH AS WIRE, CABLE, TREE ROOTS, PIECES OF CONCRETE, CLODS, LUMPS, OR OTHER UNSUITABLE MATERIAL. 7. RECOMMENDED SEEDING DATES: PERMANENT: APRIL 15 THROUGH JUNE 15 AUGUST 15 THROUGH SEPTEMBER 15 TEMPORARY: MARCH 1 TO JUNE 15 AUGUST 1 TO OCTOBER 1 8. RECOMMENDED SEED MIXTURES: THE SEED MIXTURE SHALL BE ONE RECOMMENDED BY THE NATIONAL RESOURCES CONSERVATION SERVICE OR THE FOLLOWING: APPLICATIONSEED MIXTURELBS./1000 SQ. FT. LAWNSKENTUCKY BLUEGRASS1.8 CREEPING RED FESCUE1.8 PERENNIAL RYE GRASS0.4 ROADSIDES OR SLOPESCREEPING RED FESCUE1.9 REDTOP0.2 TALL FESCUE OR SMOOTH BROMEGRASS1.9 SLOPES (NO MOWING)CREEPING RED FESCUE2.1 REDTOP0.2 CROWN VETCH WITH INOCULANT1.7 OR FLAT PEA WITH INOCULANT(3.5) TEMPORARYWINTER RYE3.0 OR ANNUAL RYEGRASS3.0 9. SEEDING: a. APPLY SEED UNIFORMLY BY HAND, CYCLONE SEEDER, DRILL, CULTIPACKER TYPE SEEDER OR HYDROSEEDER (SLURRY INCLUDING SEED AND FERTILIZER). NORMAL SEEDING DEPTH IS FROM 1/4 TO 1/2 INCH. HYDROSEEDINGS WHICH ARE MULCHED MAY BE LEFT ON SOIL SURFACE. b. WHERE FEASIBLE, EXCEPT WHERE EITHER A CULTIPACKER TYPE SEEDER OR HYDROSEEDER IS USED, THE SEEDBED SHOULD BE FIRMED FOLLOWING SEEDING OPERATIONS WITH A ROLLER, OR LIGHT DRAG. SEEDING OPERATIONS SHOULD BE ON THE CONTOUR. c. IF SEEDING CANNOT BE DONE WITHIN THE SEEDING DATES, USE TEMPORARY MULCHING WITH AN APPLICATION RATE OF 2.5 TO 3 TONS/ACRE TO PROTECT THE SITE AND DELAY SEEDING UNTIL THE NEXT RECOMMENDED SEEDING PERIOD. 10. STABILIZING APPLIED TOPSOIL: IMMEDIATELY FOLLOWING TOPSOIL APPLICATIONS, PROTECT THE TOPSOIL FROM EROSION BY EITHER SODDING, SEEDING AND/OR MULCHING. ADDITIONAL STABILIZATION MEASURES MAY BE REQUIRED. GENERAL NOTES: 1. THE CONTRACTOR SHALL USE "CALL BEFORE YOU DIG, 1-800-922-4455" PRIOR TO ANY CONSTRUCTION ACTIVITY. 2. CONSTRUCTION METHODS AND MATERIALS, SHALL CONFORM TO THE REGULATIONS OF CONNDOT FORM 818.AS AMENDED. 3. THE CONTRACTOR SHALL VERIFY ALL LINES AND GRADES PRIOR TO ANY CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND INCURRING THE COST OF ALL REQUIRED PERMITS, INSPECTIONS, CERTIFICATES, ETC. 5. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR JOBSITE SAFETY AND SHALL COMPLY WITH ALL FEDERAL AND STATE OCCUPATIONAL SAFETY AND HEALTH AUTHORITY (O.S.H.A.) REGULATIONS. 6. THE CONTRACTOR SHALL PROVIDE, INSTALL, MAINTAIN AND REMOVE ALL SHORING, BRACING AND OTHER ITEMS NECESSARY TO RETAIN BANKS OR EXCAVATIONS AND PREVENT CAVE-INS AND DISPLACEMENT OF ADJOINING GROUND. SHORING AND BRACING SHALL BE ENTIRELY INDEPENDENT OF FOOTINGS. 7. THE CONTRACTOR SHALL KEEP TRENCHES FREE FROM STANDING WATER AT ALL TIMES UNTIL PERMANENT WORK IS IN PLACE. ALL NECESSARY WELL-POINTING AND/OR PUMPING SHALL BE PERFORMED AND MAINTAINED AT THE CONTRACTOR'S EXPENSE. 6. ALL EXPOSED CURB ENDS ARE TO BE TAPERED. 7. SAW CUT EXISTING CURBS AND PAVEMENT WHERE THEY MEET PROPOSED CURBS OR PAVEMENT. MULCH FOR SEED (MS) APPLICABILITY: USED WITH TEMPORARY SEEDING AND PERMANENT SEEDING MEASURES. MATERIALS MULCH FOR SEED, INCLUDING TACKIFIERS AND NETTINGS USED TO ANCHOR MUCH, SHALL BE: ·BIODEGRADABLE OR PHOTO-DEGRADABLE WITHIN 2 YEARS HUT WITHOUT SUBSTANTIAL DEGRADATION OVER A PERIOD OF 6 WEEKS, ·FREE OF CONTAMINANTS THAT POLLUTE THE AIR OR WATERS OF THE STATE WHEN PROPERLY APPLIED, ·FREE OF FOREIGN MATERIAL, COARSE STEMS AND ANY SUBSTANCE TOXIC TO PLANT GROWTH OR WHICH INTERFERES WITH SEED GERMINATION, AND ·CAPABLE OF BEING APPLIED EVENLY SUCH THAT IT PROVIDES 80%-95% SOIL COVERAGE AND STILL ADHERES TO THE SOIL SURFACE, DOES NOT SLIP ON SLOPES WHEN IT RAINS OR IS WATERED, DOES NOT BLOW OF SITE, DISSIPATES RAINDROP SPLASH, HOLDS SOIL MOISTURE, MODERATES SOIL TEMPERATURES AND DOES NOT INTERFERE WITH SEED GROWTH. TYPES OF MULCHES WITHIN THIS SPECIFICATION INCLUDE, BUT ARE NOT LIMITED TO: HAY: THE DRIED STEMS AND LEAFY PARTS OF PLANTS CUT AND HARVESTED, SUCH AS ALFALFA, CLOVERS, OTHER FORAGE LEGUMES AND THE FINER STEMMED, LEAFY GRASSES. STEM LENGTH SHOULD NOT AVERAGE LESS THAN 4 INCHES. HAY THAT CAN BE WINDBLOWN MUST BE ANCHORED. PREFERRED MULCH WHEN SEEDING OCCURS OUTSIDE OF THE RECOMMENDED SEEDING DATES. STRAW: CUT AND DRIED STEMS OF HERBACEOUS PLANTS, SUCH AS WHEAT BARLEY, CEREAL RYE, OR BROOM. THE AVERAGE STEM LENGTH SHOULD NOT BE LESS THAN 4 INCHES. STRAW THAT CAN BE WINDBLOWN SHOULD BE ANCHORED TO HOLD IT IN PLACE. CELLULOSE FIBER: FIBER ORIGIN IS EITHER VIRGIN WOOD, POST-INDUSTRIAL/PRE-CONSUMER WOOD OR POST CONSUMER WOOD COMPLYING WITH MATERIALS SPECIFICATION (COLLECTIVELY REFERRED TO AS "WOOD FIBER"), NEWSPAPER, KRAFT PAPER, CARDBOARD (COLLECTIVELY REFERRED TO AS "PAPER FIBER") OR A COMBINATION OF WOOD AND PAPER FIBER. PAPER FIBER, IN PARTICULAR, SHALL NOT CONTAIN BORON, WHICH INHIBITS SEED GERMINATION. THE CELLULOSE FIBER MUST BE MANUFACTURED IN SUCH A MANNER THAT AFTER THE ADDITION TO AND AGITATION IN SLURRY TANKS WITH WATER, THE FIBERS IN THE SLURRY BECOME UNIFORMLY SUSPENDED TO FORM A HOMOGENEOUS PRODUCT. SUBSEQUENT TO HYDRAULIC SPRAYING ON THE GROUND, THE MULCH SHALL ALLOW FOR THE ABSORPTION AND PERCOLATION OF MOISTURE AND SHALL NOT FORM A TOUGH CRUST SUCH THAT IT INTERFERES WITH SEED GERMINATION OR GROWTH. GENERALLY APPLIED WITH TACKIFIER AND FERTILIZER. REFER TO MANUFACTURER'S SPECIFICATIONS FOR APPLICATION RATES NEEDED TO ATTAIN 80%-95% COVERAGE WITHOUT INTERFERING WITH SEED GERMINATION OR PLANT GROWTH. NOT RECOMMENDED AS A MULCH FOR USE WHEN SEEDING OCCURS OUTSIDE OF THE RECOMMENDED SEEDING DATES. OTHER MULCHES ALSO INCLUDE CORN STALKS AND OTHER SIMILAR ORGANIC MATERIALS PROVIDED THEY MEET THE REQUIREMENTS LISTED IN THE FIRST PARAGRAPH OF THIS SECTION. DOES NOT INCLUDE MATERIALS SUCH AS WOOD CHIPS, BARK CHIPS OR COCOA HULLS. TACKIFIERS WITHIN THIS SPECIFICATION INCLUDE, BUT ARE NOT LIMITED TO: WATER SOLUBLE MATERIALS THAT CAUSE MULCH PARTICLES TO ADHERE TO ONE ANOTHER, GENERALLY CONSISTING OF EITHER A NATURAL VEGETABLE GUM BLENDED WITH GELLING AND HARDENING AGENTS OR A BLEND OF HYDROPHILIC POLYMERS, RESINS, VISCOSIFIERS, STICKING AIDS AND GUMS. GOOD FOR AREAS INTENDED TO BE MOWED. CELLULOSE FIBER MULCH MAY BE APPLIED AS A TACKIFIER TO OTHER MULCHES, PROVIDED THE APPLICATION IS SUFFICIENT TO CAUSE THE OTHER MULCHES TO ADHERE TO ONE ANOTHER. EMULSIFIED ASPHALT IS SPECIFICALLY PROHIBITED FOR USE AS TACKIFIER DUE TO ITS POTENTIAL FOR CAUSING WATER POLLUTION FOLLOWING ITS APPLICATION. NETTINGS WITHIN THIS SPECIFICATION INCLUDE, BUT ARE NOT LIMITED TO: PREFABRICATED OPENWORK FABRICS MADE OF CELLULOSE CORDS, ROPES, THREADS, OR BIODEGRADABLE SYNTHETIC MATERIAL THAT IS WOVEN, KNOTTED OR MOLDED IN SUCH A MANNER THAT IT HOLDS MULCH IN PLACE UNTIL VEGETATION GROWTH IS SUFFICIENT TO STABILIZE THE SOIL. GENERALLY USED IN AREAS WHERE NO MOWING IS PLANNED. EXAMPLES OF NETTING ARE TOBACCO NETTING (USED WHERE FLOWS ARE NOT CONCENTRATED) AND JUTE NETTING (TYPICALLY USED IN DRAINAGEWAYS). SUBSTITUTE MEASURES:WHERE MULCH ANCHORING IS REQUIRED A TEMPORARY EROSION CONTROL BLANKET MAYBE USED. SITE PREPARATION:FOLLOW REQUIREMENTS OF PERMANENT SEEDING OR TEMPORARY SEEDING. APPLICATION TIMING: APPLIED IMMEDIATELY FOLLOWING SEEDING. SOME CELLULOSE FIBER MAY BE APPLIED WITH SEED TO ASSIST IN MARKING WHERE SEED HAS BEEN SPRAYED, BUT EXPECT TO APPLY A SECOND APPLICATION OF CELLULOSE FIBER TO MEET THE REQUIREMENTS OF MULCH FOR SEED. SPREADING: MULCH MATERIAL SHALL BE SPREAD UNIFORMLY BY HAND OR MACHINE RESULTING IN 80%-95% COVERAGE OF THE DISTURBED SOIL WHEN SEEDING WITHIN THE RECOMMENDED SEEDING DATES. APPLICATIONS THAT ARE UNEVEN CAN RESULT IN EXCESSIVE MULCH SMOTHERING THE GERMINATING SEEDS. FOR HAY OR STRAW ANTICIPATE AN APPLICATION RATE OF 2 TONS PER ACRE. FOR CELLULOSE FIBER FOLLOW MANUFACTURER'S RECOMMENDED APPLICATION RATES TO PROVIDE 80%-95% COVERAGE. WHEN SEEDING OUTSIDE THE RECOMMENDED SEEDING DATES, INCREASE MULCH APPLICATION RATE TO PROVIDE BETWEEN 95%-100% COVERAGE OF THE DISTURBED SOIL. FOR HAY OR STRAW ANTICIPATE AN APPLICATION RATE OF 2.5 TO 3 TONS PER ACRE. WHEN SPREADING HAY MULCH BY HAND, DIVIDE THE AREA TO BE MULCHED INTO APPROXIMATELY 1,000 SQUARE FEET AND PLACE 1.5-2 BALES OF HAY IN EACH SECTION TO FACILITATE UNIFORM DISTRIBUTION. FOR CELLULOSE FIBER MULCH, EXPECT SEVERAL SPRAY PASSES TO ATTAIN ADEQUATE COVERAGE, TO ELIMINATE SHADOWING, AND TO AVOID SLIPPAGE (SIMILAR TO SPRAYING WITH PAINT). MACHINE CLOGGING CAN OCCUR IF PRODUCT IS IMPROPERLY LOADED OR IF LEFTOVER PRODUCT IS LEFT IN MACHINE WITHOUT CLEANING. COMPLY WITH THE MANUFACTURER'S RECOMMENDATIONS FOR APPLICATION REQUIREMENTS AND MULCH MATERIAL SPECIFICATIONS. ANCHORING: WHEN NEEDED, MULCH ANCHORING IS APPLIED EITHER WITH THE MULCH AS WITH CELLULOSE FIBER OR APPLIED IMMEDIATELY FOLLOWING MULCH APPLICATION. EXPECT THE NEED FOR MULCH ANCHORING ALONG THE SHOULDERS OF ACTIVELY TRAVELED ROADS, HILL TOPS AND LONG OPEN SLOPES NOT PROTECTED BY WIND BREAKS. WHEN USING NETTING, THE MOST CRITICAL ASPECT IS TO ENSURE THAT THE NETTING MAINTAINS SUBSTANTIAL CONTACT WITH THE UNDERLYING MULCH AND THE MULCH, IN TURN, MAINTAINS CONTINUOUS CONTACT WITH THE SOIL SURFACE. WITHOUT SUCH CONTACT, THE MATERIAL IS USELESS AND EROSION OCCURS. INSTALL IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. MAINTENANCE INSPECT MULCHED AREAS AT LEAST ONCE A WEEK AND WITHIN 24 HOURS OF THE END OF A STORM WITH A RAINFALL AMOUNT OF 0.5 INCH OR GREATER UNTIL THE GRASS HAS GERMINATED TO DETERMINE MAINTENANCE NEEDS. WHERE MULCH HAS BEEN MOVED OR WHERE SOIL EROSION HAS OCCURRED, DETERMINE THE CAUSE OF THE FAILURE. IF IT WAS THE RESULT OF WIND, THEN REPAIR EROSION DAMAGE (IF ANY), RE-APPLY MULCH (AND SEED AS NEEDED) AND CONSIDER APPLYING A NETTING OR TACKIFIER. IF MULCH FAILURE WAS CAUSED BY CONCENTRATING WATER, INSTALL ADDITIONAL MEASURES TO CONTROL WATER AND SEDIMENT MOVEMENT, REPAIR EROSION DAMAGE, RE-APPLY MULCH AND CONSIDER APPLYING A NETTING OR TACKIFIER OR USE THE TEMPORARY EROSION CONTROL BLANKET MEASURE. ONCE GRASS HAS GERMINATED, INSPECTIONS SHOULD CONTINUE AS REQUIRED BY TEMPORARY SEEDING AND PERMANENT SEEDING. PROJECT NARRATIVE: THE PROPOSED PROJECT CONSISTS OF THE CONSTRUCTION OF A PEDESTRIAN WALKING PATH IN THE TOWN PARK. THE PURPOSE OF THE WALK IS TO CONNECT THE EXISTING BITUMINOUS WALK WITH A NEW WALK THAT WILL PROVIDE AN ACCESSIBLE ROUTE TO THE ROVERS SOCCER FIELDS. THE EXISTING WOODS TRAIL FROM THE PARKING LOT TO THE NORTHERNMOST FIELD WILL BE REBUILT IN IT'S CURRENT LOCATION. A SERIES OF STAIRS WILL BE ADDED TO THE PATH TO EASE THE ASSENT OF THE STEEP SLOPE. THE PROJECT AREA IS APPROXIMATELY 25,580 S.F OF THE EXISTING 116 ACRE PARK. THE 5-FT WIDE NEW BITUMINOUS WALK WILL BE APPROXIMATELY 1514 FEET LONG COVERING 7680 SF AND WILL MOSTLY BE LOCATED IN EXISTING GRASSED AREAS. PROPOSED GRADES WILL MOSTLY MATCH THE EXISTING GRADES. THE WALK WILL BE CONSTRUCTED OF BITUMINOUS CONCRETE AS IS INTENDED FOR PEDESTRIAN WALKING USE. THE PROPOSED WOODS TRAIL WILL FOLLOW THE EXISTING ROUTE. THE PATH WILL BE REBUILT AS A 6-FT WIDE STONE DUST PATH WITH STAIRS. THE THE PATH IS 630-FT LONG AND COVERS APPROXIMATELY 3790 S.F. THE SITE CONTAINS APPROXIMATELY 2,693,000 SF (61.8 AC.) OF WETLAND SOILS AND WATERCOURSES. THE WETLAND SOILS ARE OCCUM FINE SANDY LOAM AND SUNCOOK LOAMY FINE SAND WHICH ARE ALLUVIAL AND FLOOD PLAIN SOILS. THEY ARE PRESENTLY COVERED BY 89,358 SF (2.1 AC.) OF IMPERVIOUS SURFACE. APPROXIMATELY 1,600 LF (8000 SF) OF BITUMINOUS WALK WILL BE LOCATED IN WETLAND (FLOODPLAIN) SOILS. THE RECONSTRUCTED WOODS PATH WILL COVER APPROXIMATELY 2722 S.F. OF WETLANDS/REGULATED AREA. IN ADDITION, A TOTAL OF 15,000 SF OF WETLAND (FLOODPLAIN) AREA WILL BE DISTURBED. ALL EXCEPT 9960 SF. WILL BE TEMPORARY. THE BALANCE OF THE SITE CONTAINS HINCKLEY GRAVELY SANDY LOAM SOILS OR IS HINCKLEY URBAN LAND COMPLEX. OTHER THAN THE FLOOD PLAIN SOILS, THERE ARE NO SIGNIFICANT AREAS OF WETLAND SOILS. EXCEPT FOR THE AREA ADJACENT TO THE WEST BRANCH OF SALMON BROOK WHICH IS LOCATED ALONG THE WESTERLY BORDER OF THE PROJECT. THERE ARE NO ACTIVITIES PROPOSED WITHIN THE BROOK AND EXISTING DRAINAGE PATTERNS WILL BE MAINTAINED. TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES WILL BE IMPLEMENTED DURING CONSTRUCTION. THE ANTICIPATED CONSTRUCTION WILL BEGIN IN THE SPRING OF 2027 AND END IN THE FALL OF 2027. THE RESPONSIBLE PARTY IS: SANDRA YOST DIRECTOR OF COMMUNITY SERVICES TOWN OF GRANBY 860-844-5351 MITIGATION ACTIVITIES NARRATIVE: IMPACTS ASSOCIATED WITH THE CONSTRUCTION AND MAINTENANCE OF THE PROPOSED SIDEWALK AND SITTING AREAS ARE MINIMAL, LIMITED TO THE ADDITION OF IMPERVIOUS AREA WITHIN AN ALLUVIAL WETLAND AND THE URA OF THE SALMON BROOK. THE AREA WHERE THE SIDEWALK WILL BE INSTALLED IS CURRENTLY MAINTAINED LAWN FOR RECREATION, AND AS PART OF THE PROJECT THE LAWN AREA WILL BE RESTORED TO NATIVE VEGETATION AS DESIGNATED BY THE FOLLOWING MITIGATION PLAN BELOW AND AS DEPICTED ON THE “PLAN TOWN OF GRANBY SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING, 215 SALMON BROOK STREET, GRANBY, CT”, DATED 9.3.26, COVER SHEET, C1-C4 AND DE1-DE3, AS AMENDED. POTENTIAL IMPACTS DURING CONSTRUCTION ARE LIMITED TO SEDIMENT MIGRATION FROM THE CONSTRUCTION AREA INTO A REGULATED AREA. AS SEEN DURING THE FIRST PHASE OF THE SIDEWALK, SOIL DISTURBANCE ASSOCIATED WITH THIS PROJECT IS MINIMAL AND TEMPORARY. BARRIER EROSION CONTROLS WILL BE TEMPORARILY PLACED AS NECESSARY TO PREVENT SEDIMENT MIGRATION DURING PRECIPITATION EVENTS, AND THE AREA WILL BE SEEDED AND MULCHED AS SOON AS POSSIBLE. A QUICK GERMINATING SEED MIX WILL PROVIDE FOR BOTH RAPID AND LONG-TERM VEGETATIVE STABILIZATION. THIS PROJECT COULD POTENTIALLY FIT THE REQUIREMENTS OF A NONREGULATED USE, DUE TO THE GOAL OF PROVIDING EQUITABLE OUTDOOR RECREATION OPPORTUNITIES, HOWEVER, IT REQUIRES A GOOD AMOUNT OF DISTURBANCE AND THEREFORE A PERMIT IS REQUESTED. THE TOWN PROPOSES TO INCORPORATE VEGETATION MANAGEMENT AND PLANTING EFFORTS AT KEY AREAS ALONG THE PROJECT ROUTE. THESE AREAS WERE SELECTED WHERE AREAS COULD USE DEEPLY ROOTED VEGETATION FOR LONG-TERM SOIL STABILIZATION MEASURES ADJACENT TO THE SALMON BROOK. PLANTINGS IN THE CHOSEN LOCATIONS WILL PROVIDE ADDITIONAL VEGETATIVE BUFFERS ALONG SALMON BROOK, AIDING IN LONG-TERM BANK STABILITY AND PARK/PROJECT PROTECTION. MITIGATION EFFORTS SHALL BE SUPERVISED DAILY DURING VEGETATION REMOVAL AND PLANTING OPERATIONS BY THE GRANBY WETLANDS AGENT OR THE IWWC DESIGNEE. THESE EFFORTS SHALL INCLUDE INVASIVE SPECIES REMOVAL, SOIL STABILIZATION PLANTINGS, AND SIGNAGE AT A SALMON BROOK ACCESS TRAIL. THE FOLLOWING DESCRIBES THE MITIGATION ACTIVITIES IN DETAIL FOR THE PROJECT, INCLUDING HOW EACH MITIGATION AREA SHALL BE TREATED. SITEWIDE: ALONG THE PROJECT ROUTE, ALL VINES THAT ARE CHOKING TREES SHALL BE CUT AT THEIR BASE AND AN HERBICIDE APPLIED TO THE FRESH CUT STUMP. A CONE SPRAYER OR PAINT ON METHOD MAY BE UTILIZED AND APPLIED IN ACCORDANCE WITH ALL APPLICABLE LAWS. THE EXTENT OF ORIENTAL BITTERSWEET (CELASTRUS ORBICULATUS) IN SOME LOCATIONS IS EXTENSIVE, AND COMPLETE ERADICATION IS HIGHLY UNLIKELY DUE TO THE RIVERINE LOCATION PROVIDING A CONSTANT SEED SOURCE FOR POTENTIAL SPECIES RE-ESTABLISHMENT. THEREFORE, A MORE REALISTIC GOAL IS TO PRESERVE MATURE TREES THAT ARE BEING “STRANGLED” BY VINES. VINES DO NOT NEED TO BE REMOVED FROM THE TREE OR THE SITE BUT ALLOWED TO DEGRADE IN PLACE. AS DIRECTED BY THE SUPERVISING IWWC DESIGNEE, TARGET INVASIVE SPECIES SHALL BE REMOVED AND PROPERLY DISPOSED. THE TARGET SPECIES INCLUDES BUT IS NOT LIMITED TO LARGE AUTUMN OLIVE (ELAEAGNUM UMBELLATA) AND MULTIFLORA ROSE (ROSA MULTIFLORA) SPECIES. AREA 1: THIS AREA IS ADJACENT TO A BEND IN THE SALMON BROOK AND IS CURRENTLY MAINTAINED LAWN. TO AID IN PRESERVING THE UPLAND AREA ADJACENT TO THE BANKS, 3 TREES AND 10 SHRUBS ARE RECOMMENDED TO BE INSTALLED IN THIS AREA. INCLUDED IN THIS AREA ARE 3 PERENNIAL ISLANDS, EACH PERENNIAL ISLAND SHALL INCLUDE 6 HERBACEOUS PLANTINGS. IT IS RECOMMENDED THAT THE AREA CONTINUE TO BE MOWED BETWEEN THE TREE AND SHRUBS FOR 2 YEARS, OR LONGER IF APPROVED, TO PREVENT INVASIVE SPECIES OVERGROWTH. ONCE STRONG ESTABLISHMENT OF PLANTINGS, THE AREA MAY NO LONGER BE MOWED. ALL PLANTINGS SHALL BE CLEARLY STAKED. AREA 2: THIS AREA IS VEGETATED BUT DOES NOT CONTAIN ANY CANOPY TREES. IT IS PROPOSED TO INSTALL 1 TREE IN THIS LOCATION THAT IS GREATER THAN 6 FEET TALL. AN AREA AROUND THE TREE INSTALLATION AREA SHALL BE CLEARED OF INVASIVE SPECIES. MOWING AROUND INSTALLED TREES SHALL OCCUR FOR 2 FULL GROWING SEASONS. AREA 3: THIS AREA IS VEGETATED BUT DOES NOT CONTAIN ANY CANOPY TREES. IT IS PROPOSED TO INSTALL 2 TREES AND 6 SHRUBS IN THIS LOCATION THAT IS GREATER THAN 6 FEET TALL. AN AREA AROUND THE TREE INSTALLATION AREA SHALL BE CLEARED OF INVASIVE SPECIES. MOWING AROUND INSTALLED TREES SHALL OCCUR FOR 2 FULL GROWING SEASONS. AREA 4: THIS AREA IS VEGETATED BUT DOES NOT CONTAIN ANY CANOPY TREES. IT IS PROPOSED TO INSTALL 1 TREE IN THIS LOCATION THAT IS GREATER THAN 6 FEET TALL. AN AREA AROUND THE TREE INSTALLATION AREA SHALL BE CLEARED OF INVASIVE SPECIES. MOWING AROUND INSTALLED TREES SHALL OCCUR FOR 2 FULL GROWING SEASONS. AREA 5: ALONG THE TREE LINE, A LINE OF HERBACEOUS PERENNIALS ARE PROPOSED TO BE INSTALLED. THIS WILL INCREASE THE ROOT PROFILE AND REDUCE MOWING IN THIS CRITICAL LOCATION. AREA 6: THIS AREA IS VEGETATED BUT DOES NOT CONTAIN ANY CANOPY TREES. IT IS PROPOSED TO INSTALL 2 TREES AND 6 SHRUBS IN THIS LOCATION THAT IS GREATER THAN 6 FEET TALL. AN AREA AROUND THE TREE INSTALLATION AREA SHALL BE CLEARED OF INVASIVE SPECIES. MOWING AROUND INSTALLED TREES SHALL OCCUR FOR 2 FULL GROWING SEASONS. VEGETATION PLANTING SPECIES SELECTION: TREES: RED MAPLE (ACER RUBRUM), SHAGBARK HICKORY (CARYA OVATA), AMERICAN ELM (ULMUS AMERICANA), COTTONWOOD (POPULUS DELTOIDES), AND AMERICAN SYCAMORE (PLATANUS OCCIDENTALIS). SHRUBS: STAGHORN SUMAC (RHUS TYPHINA), SWEET PEPPERBUSH (CLETHRA ALNIFOLIA), AND ELDERBERRY (SAMBUCUS ANADENSIS) HERBACEOUS PERENNIALS: COMMON MILKWEED (ASCLEPIAS SYRIACA), BLACK-EYED SUSAN (RUDBECKIA HIRTA), BROWN-EYED SUSAN (RUDBECKIA TRILOBA) NO.DATEDESCRIPTION REVISIONS GRANBY TOWN HALL 15 NORTH GRANBY ROAD GRANBY, CONNECTICUT 06035 PHONE: (860) 844-5318 FAX: (860) 844-5325 TOWN OF GRANBY ENGINEERING DEPARTMENT SCALE:DATE:JOB #:SHEET: 1"=20'SEPTEMBER 3, 2026 2025.G01DE-3 DETAILS & NOTES TOWN OF GRANBY SALMON BROOK PARK CONNECTOR TO AUXILIARY PARKING 215 SALMON BROOK STREET GRANBY, CONNECTICUT
Page 111
Page 112
TOWN OF GRANBY Incorporated 1786 15 North Granby Road Granby, Connecticut 06035-2102 September 4, 2026 Paige and Brandon Richard 54 Hartford Avenue Granby, CT 06035 RE: 54 Hartford Avenue – B. Richard – Permit request to place a 14’x24’ prefabricated shed on a 16’x26’ crushed stone base with future underground electrical conduit. Dear Mr. and Mrs. Richard: Please be advised that on September 4, 2026, the Inland Wetlands and Watercourses Commission (IWWC) Agent approved the subject application in accordance with the application and supporting documentation received to date. The following are the conditions of this approval. 1. The Office of Community Development shall be notified at least 48 hours prior to the start of any construction activities. 2. Town staff shall inspect installed erosion controls prior to the start of any work that results in earth disturbance activities, this includes, but is not limited to, grubbing and stump removal. 3. All work shall be in conformance with the approval and application materials as submitted for this Permit Approval. Any modifications to the approved plans must be reviewed and approved by the Granby Inland Wetlands and Watercourses Commission or their designated Agent. 4. Erosion controls shall be maintained to prevent sediment migration from the project area until the site has achieved permanent stabilization. Permanent stabilization is defined as 70% permanent vegetation covering over 90% of the area. A stockpile of erosion controls shall remain on site to prepare controls as necessary. The IWWC shall be notified in writing at least 48 hours in advance of erosion controls being removed. 5. Excavated soil shall not be brought off-property without the notification and approval of the Office of Community Development. The applicant shall supply the destination in writing for any excavated soil removed from the property. 6. This permit is valid for a period of 5 years from the date of issuance. 7. A Building Permit is required for the construction of the shed and future electrical work. 8. Upon completion of construction and site stabilization, the IWWC shall be notified in writing that work is complete, and a final inspection may be completed at that time. If you have any questions, please call me at your earliest convenience. Sincerely, Kate Bednaz Town of Granby IWWC Wetlands Agent
Page 113
Page 114
Page 115
Page 116
Page 117
Page 118
Page 119
Page 120
Minutes: archived copy, SHA-256 a600257c5901…. Agenda: archived copy, SHA-256 3387333789ef…. Packet: kept offline, SHA-256 745ebbdd3526….