CT Public Docs Tracker

Towns / Granby / Inland Wetlands & Watercourses Commission / Aug 12, 2026

Inland Wetlands & Watercourses Commission, Aug 12, 2026

Granby minutes posted

Documents

TypeDocumentPagesOpen
minutes IWWC Minutes 5 PDF download · town site
agenda IWWC Agenda 1 PDF download · town site
packet IWWC Meeting Packet
Not attached: this packet is 85 MB, too large to host here. Use the town site link.
115 town site

Summary of the minutes

AI-generated summary. Each line links to the PDF page it came from; check it before relying on it.

Read the official minutes (PDF, 5 pages) The PDF is the record; this summary is a guide to it.

The Commission approved the July 8, 2026 minutes, approved permits for 5 Godard Road and 215 Salmon Brook Street, and found the farming activity at 90 Salmon Brook Street and 35 Floydville as of right. It approved the revised permit for 199 Broad Hill Road with 14 conditions, continued the 37 Hartford Avenue hearing to September 9, 2026, and continued the 7 Laurel Drive enforcement order to the next regular meeting.

Decisions (8) · all reported votes

  1. Approval of July 8, 2026 Meeting Minutes
    Approved as presented
    Vote: Motion by D. Tolli, seconded by B. Scmitt, the Commission voted 4-0-1 to approve the July 8, 2026, minutes as presented. V. Dirienzo abstained. · p. 1
  2. 5 Godard Road – H. Werner and S. Werner – Permit request to construct a single-family home and detached garage with associated site improvements within a regulated area
    Application and approval letter approved as presented, with proposed conditions of approval stated (regulated area marked on site; pond maintenance and repair addressed during house construction; mylar of as-built to be filed; bond to be submitted)
    Vote: Motion by F. Jones, seconded by N. Dethlefsen, the Commission voted 5-0-0 to approve the application and approval letter as presented. · p. 1
  3. 215 Salmon Brook Street – Town of Granby – Permit request to construct a gazebo on a concrete pad within a regulated area
    Application and approval letter with standard conditions approved as presented
    Vote: Motion by F. Jones, seconded by B. Schmitt, the Commission voted 5-0-0 to approve the application and approval letter as presented. · p. 1
  4. 90 Salmon Brook Street and 35 Floydville – J. Gravel c/o Broadleaf Solar – Request for Review to address pre-existing soil/erosion concerns and establish a vegetative cover
    Determined the proposed activity is as of right under the farming provision in Section 4.1a
    Vote: Motion by B. Schmitt, seconded by D. Tolli, the Commission voted 5-0-0 that the proposed activity is as of right under the farming provision in Section 4.1a. · p. 1, p. 2
  5. 199 Broad Hill Road – T. Kurnicki – Public hearing on permit request to construct a single-family home with associated site improvements within a regulated area (opened and continued from 7/8/26) $2,000
    Public hearing closed; application and approval letter approved as revised with 14 conditions, including bond increased to $2,000 and added condition 14 on invasive species removal
    Vote: Motion by F. Jones, seconded by N. Dethlefsen, the Commission voted 5-0-0- to approve the application and approval letter as revised with the 14 conditions. · p. 2
  6. 37 Hartford Avenue – F. Devine – Public hearing on permit application for regulated activities for a 16-unit apartment building and associated site improvements
    Public hearing continued to the next regular meeting on September 9, 2026
    Vote: Motion by B. Schmitt, seconded by N. Dethlefsen, the Commission voted 5-0-0 to continue the public hearing to the next regular meeting. · p. 2, p. 3, p. 4
  7. Recess at 9:10 p.m.
    Five-minute recess taken
    Vote: Motion by B. Schmitt, seconded by N. Dethlefsen, the Commission voted 5-0-0 to take a 5-minute recess at 9:10 p.m. · p. 4
  8. Adjournment
    Meeting adjourned at 9:51 p.m.
    Vote: Motion by F. Jones seconded by N. Dethlefsen, the Commission voted 5-0-0 to adjourn the meeting at 9:51p.m. · p. 5

Also discussed (5)

  • 7 Laurel Drive – C. Fontaine and R. Weiner – Show cause hearing for conducting a regulated activity without a valid IWWC Permit: Enforcement Order upheld and continued to the next regular meeting · p. 4
  • 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Agent report on regulated activity without a valid IWWC Permit: Staff directed that an existing conditions plan be submitted within the next two weeks; mitigation plan required for area beyond the pond; legal counsel to be sought if no progress is made · p. 4, p. 5
  • 55 Northwoods Road – M. Fusick – Permit request to construct a 32' x 24' detached garage with underground electrical within a regulated area: Authorized Agent approval 07.16.26 (reported) · p. 5
  • 17 Farmview Lane – S. Bernabucci c/o Juliano's Pools – Permit request to install an 18' x 36' inground swimming pool with patio and associated site improvements within a regulated area: Authorized Agent approval 07.17.26 (reported) · p. 5
  • 13 & 14 Evangeline Place – Town of Granby – Permit request to install a storm drainage system as part of re-paving project: Authorized Agent approval 07.21.26 (reported) · p. 5
Summary of the agenda: IWWC Agenda

AI-generated summary.

This is the Granby Inland Wetlands and Watercourses Commission agenda for its regular meeting on August 12, 2026, listing permit requests, a request for review, public hearings, a show cause hearing, and agent reports.

On the agenda (12)

  1. Action on the July 8, 2026, Meeting Minutes · p. 1
  2. 5 Godard Road – H. Werner and S. Werner – Permit request to construct a single-family home and detached garage with associated site improvements within a regulated area (Continued from 7/8/26) · p. 1
  3. 215 Salmon Brook Street – Town of Granby – Permit request to construct a gazebo on a concrete pad within a regulated area (Continued from 7/8/26) · p. 1
  4. 90 Salmon Brook Street and 35 Floydville – J. Gravel c/o Broadleaf Solar – Request for Review to address pre-existing soil/erosion concerns and establish a vegetative cover (Received 7/8/26) · p. 1
  5. 199 Broad Hill Road – T. Kurnicki – Public hearing on permit request to construct a single-family home with associated site improvements within a regulated area (Hearing opened and continued from 7/8/26) · p. 1
  6. 37 Hartford Avenue – F. Devine – Public hearing on permit application for regulated activities in connection with development of a 16-unit apartment building and associated site improvements (Hearing opened and continued from 7/8/26) · p. 1
  7. 7 Laurel Drive – C. Fontaine and R. Weiner – Show cause hearing on conducting a regulated activity without a valid IWWC Permit (Continued from 7/8/26) · p. 1
  8. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Agent report on conducting a regulated activity without a valid IWWC Permit · p. 1
  9. 55 Northwoods Road – M. Fusick – Permit request to construct a 32' x 24' detached garage with underground electrical within a regulated area (Authorized Agent approval 07.16.26) · p. 1
  10. 17 Farmview Lane – S. Bernabucci c/o Juliano's Pools – Permit request to install an 18' x 36' inground swimming pool inclusive of patio and associated site improvements within a regulated area (Authorized Agent approval 07.17.26) · p. 1
  11. 13 & 14 Evangeline Place – Town of Granby – Permit request to install a storm drainage system as part of re-paving project (Authorized Agent approval 07.21.26) · p. 1
  12. Submission rules for display materials (passage 1): Notice only: materials received after the 10 AM deadline will not be accepted for display; no decision recorded · p. 1

Full text of the documents

View the minutes PDF on this page (IWWC Minutes) Open the PDF
Text of the minutes (IWWC Minutes, 5 pages)

Page 1 · open in PDF

 
1 
MEETING MINUTES 
Town of Granby 
Inland Wetlands and Watercourses Commission 
Wednesday, August 12, 2026, at 7:00 p.m. 
 
PRESENT: Nick Dethlefsen, Vickie Dirienzo, Fred Jones, Barbara Schmitt, and David Tolli 
ALSO PRESENT: IWWC Agent Kate Bednaz 
 
1. Call to Order 
Acting Chair V. Dirienzo called the meeting to order at 7:00 p.m. 
 
2. Action on the July 8, 2026, Meeting Minutes 
 
ON A MOTION by D. Tolli, seconded by B. Scmitt, the Commission voted 4-0-1 to 
approve the July 8, 2026, minutes as presented. V. Dirienzo abstained. 
 
3. Permit Requests 
a. 5 Godard Road – H. Werner and S. Werner – Permit request to construct a single-
family home and detached garage with associated site improvements within a 
regulated area. 
S. Werner, 5 Godard Road, reported she has been in touch with the Wetlands Agent, and 
all outstanding items have been addressed and are reflected in the revised plans. K. 
Bednaz provided an overview of the plans, explaining the changes. S. Werner noted that 
Farmington Valley Health District approved the septic system design. A draft approval 
letter was provided to the Commission for review. K. Bednaz stated for the record the 
proposed conditions of approval, which include the regulated area that will be marked on 
site; pond maintenance and repair will be addressed as part of the house construction; a 
mylar of the as-built will be filed; and a bond will be submitted. 
 
ON A MOTION by F. Jones, seconded by N. Dethlefsen, the Commission voted 5-0-0 to 
approve the application and approval letter as presented. 
 
b. 215 Salmon Brook Street – Town of Granby – Permit request to construct a gazebo 
on a concrete pad within a regulated area.  
K. Bednaz provided an overview of the application, noting this was received at the 
Commission’s July meeting. The project includes the installation of a concrete pad and 
construction of a gazebo. It was also noted the project includes the installation of eight 
concrete pads adjacent to the walking path to accommodate benches. The Commission 
reviewed the draft approval letter with the standard conditions of approval. 
 
ON A MOTION by F. Jones, seconded by B. Schmitt, the Commission voted 5-0-0 to 
approve the application and approval letter as presented. 
 
4. Request for Review 
a. 90 Salmon Brook Street and 35 Floydville – J. Gravel c/o Broadleaf Solar – RFR to 
address pre-existing soil/erosion concerns and establish a vegetative cover.  

Page 2 · open in PDF

 
2 
J. Gravel, representing Broadleaf Solar, presented to the Commission. He explained the 
site had some erosion issues so they thought it would be best to establish a cover crop to 
help stabilize the site. Working with Kevin Sullivan, sorghum was planted, which in 
addition to stabilizing the area, helps add nutrients. Silt fence and waddles were also 
installed to help control erosion. In response to a question, it was noted that the crop may 
be mowed down and left as a thatch or it may be mowed down then folded back into the 
soil to establish another crop. Both approaches would prevent erosion. K. Bednaz 
provided information about the site visit and further explained the request for review. It 
was also noted while on site, the breach of erosion controls was observed. The applicant 
will work on a plan to address and correct this. In response to a question, J. Gravel 
provided an overview of the siting council process to date. 
 
ON A MOTION by B. Schmitt, seconded by D. Tolli, the Commission voted 5-0-0 that 
the proposed activity is as of right under the farming provision in Section 4.1a. 
 
5. Public Hearings 
a. 199 Broad Hill Road – T. Kurnicki – Permit request to construct a single-family 
home with associated site improvements within a regulated area. (Hearing opened 
and continued from 7/8/26) 
T. Kurnicki presented to the Commission. He explained that there were changes to the 
plans in response to the comments, including the protection of the steep slope. The slope 
will remain as is and only those areas in proximity to the house and septic would be 
disturbed. A planting schedule with native plants and shrubs was included to limit 
potential erosion around the driveway and other disturbed areas. Removal of invasive 
species will be included as part of the project as well. In response to a question, it was 
explained that there is an existing driveway that will be regarded to access the property. 
The Commission noted that the proposed size of the trees may be problematic in terms of 
the root ball and disturbed area; it was suggested that smaller trees be planted. 
There were no comments from the public. 
 
The Commission reviewed the draft approval letter that was revised after the packet was 
posted. Changes include an increase in the bond amount to $2,000. It was also noted that 
there may be an eastern box turtle habitat on the property, which is reflected in the draft 
approval letter. The Commission discussed invasive species. It was agreed that condition 
14 should be added to the letter, which states, “Invasive species within the wetland 
resource area shall be removed without soil disturbance.” It was noted that on Sheet 9, 
the note about invasive species shall be changed to include removal of species within the 
wetland area. The public hearing was closed. 
 
ON A MOTION by F. Jones, seconded by N. Dethlefsen, the Commission voted 5-0-0- 
to approve the application and approval letter as revised with the 14 conditions. 
 
b. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in 
connection with the development of a 16-unit apartment building and associated site 
improvements. 

Page 3 · open in PDF

 
3 
Professional Engineer Rebecca Li was present to discuss the application. Since the last 
meeting in July, the plan set was revised to reflect staff comments. It was noted that Sean 
Merrigan with CT Department of Public Health was unable to review the revisions before 
leaving for vacation. However, the revised plans were submitted to town staff for review. 
R. Li went through the response memo, noting how all staff comments were addressed on 
the revised plan set, starting with the Town Engineer comments. It was noted the Town 
Engineer confirmed the plan set addresses his comments. R. Li the continued with the 
Wetlands Agent comments. 
 
The Commission questioned the requirement for nitrogen dilution calculations for the 
septic system. R. Li noted that this assessment is not required under the technical 
standards for a system this size but given the history of this site, the information was 
submitted and the calculations show the project is under the 10 milligrams per liter for 
the drinking water standard. She also stated that the septic system has been moved as 
close to the road as possible. The Commission questioned the proposed trees on the slope 
and at the bottom of the slope. Plantings along the parking lot were also discussed and 
pruning practices were questioned. The Commission also discussed invasive species 
management on the site and the proposed methods to address them. 
 
Public Comment 
Attorney George Schober, Enfield, spoke on behalf of his client Peter Voskowsky, who is 
an abutting property owner. He also introduced Steve Trinkaus, Professional Engineer.  
He explained his client is concerned with the potential for effluent to seep onto his 
property and submitted a petition for intervention, stating they are able to cross examine 
and rebut what is presented. A letter from S. Trinkaus was also provided. Attorney 
Schober raised concerns regarding feasible and prudent alternatives  
 
S. Trinkaus provided information about his background and expertise. He noted two 
major issues with the subject application, the septic system and the stormwater system. It 
was stated that with a site like this, there is fast moving water through the gravel, so it 
takes a large distance for bacteria and viruses in the effluent to die off. According to his 
calculations, it was stated it results in 35 milligrams per liter, over three times the 
recommended 10 milligrams per liter. He stated his calculations also show a distance of 
332 feet are needed but the system is 54 feet from the road, so it is his opinion there will 
be groundwater pollution. For the stormwater system, the proposed system will not 
remove nitrogen, and it will run downhill, entering the wetland boundary. He further 
explained the necessary process to remove nitrogen and then discussed concerns 
regarding surface treatment during the winter months and potential pollutants. There is 
not enough data to determine groundwater levels and direction of flow. 
 
Peter Voskowsky, 53 Windmill Drive, is an abutting property owner and discussed the 
site conditions of his property at 39R Hartford Avenue, including existing seeps, wetland 
characteristics, high groundwater levels, etc. 
 
K. Bednaz requested that the applicant consult with NDDB due to the proximity of the 
proposed development to existing habitats and provided clarification regarding the septic 

Page 4 · open in PDF

 
4 
design and difficulties/feasibility of connecting to public sewer. She noted that the 
adjacent properties are functioning properly off septic systems and surrounding wetlands 
are healthy.  
 
Reinhard Maier, 138 Day Street, questioned the design of the proposed septic and 
leaching system, stating comparisons between the prior Vessel application and what is 
currently proposed. 
 
Robert Flanigan, 24 Woodcliff Drive, expressed concerns regarding potential wetlands 
contamination on the abutting property and questioned the connection to public sewer.  
 
R. Li requested a continuance of the public hearing to the next regular meeting on 
September 9, 2026.  
 
ON A MOTION by B. Schmitt, seconded by N. Dethlefsen, the Commission voted 5-0-0 
to continue the public hearing to the next regular meeting.  
 
ON A MOTION by B. Schmitt, seconded by N. Dethlefsen, the Commission voted 5-0-0 to take a 
5-minute recess at 9:10 p.m. 
 
6. Show Cause Hearing 
a. 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a Regulated Activity 
without a valid IWWC Permit. 
Property owner Colleen Fontaine was present to provide updates and noted that a site 
walk with K. Bednaz was conducted on 8/7/26 to verify that the required plantings from 
the prior Enforcement Order were installed and surviving. At this time, the owners are 
working with TJ Barresi to develop a mitigation plan that will address drainage concerns 
while maintaining the wetlands resource area. The Enforcement Order was upheld and 
continued to the next regular meeting.  
 
7. Agent Report and Correspondence 
a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – 
Conducting a Regulated Activity without a valid IWWC Permit. 
Soil Scientist David Lord was present to discuss the wetlands delineation and noted that 
the limits of the wetland delineation relative to the proposed pond has been the focus of 
his efforts to this point. The wetland delineation of the corridor where the pond is 
proposed extends from the northern boundary to the southern boundary. He provided an 
overview of the delineation, soil types, flagged locations, etc. The property owner is 
looking to create a 2.5-acre pond with surrounding pasture areas for livestock. Two small 
wetlands along the northern property boundary off case street were identified; however 
not flagged, as there are no proposed activities within that area. K. Bednaz had concerns 
regarding pre-existing conditions, as no delineation or mapping has been provided to 
indicate site conditions prior to site disturbance by the property owner. At this point, the 
Commission has not received the necessary documentation as outlined within the 
Enforcement Order, and majority of focus has been placed on the pond/dam area.  

Page 5 · open in PDF

 
5 
A mitigation plan must be provided for the area beyond the pond, as the remainder of the 
site has not been addressed. It was also noted that legal council will be sought if no 
progress is made. K. Bednaz stated that an existing conditions plan shall be submitted 
within the next two weeks, detailing impact areas, what materials will be removed and/or 
deposited, corrective measures and timeline, handling of slash, etc. Property owner Matt 
Reale questioned the keeping of livestock within a wetland area, to which staff stated her 
opinion that cows should be located outside of any wetland resource area. K. Bednaz also 
stated that the proposed farming activities are a separate matter, and the Enforcement 
Order needs to be addressed first. M. Reale requested clarification on the items outlined 
within the Enforcement Order and indicated that working with NRCS has made his 
project more stringent.  
 
b. 55 Northwoods Road – M. Fusick – Permit request to construct a 32’ x 24’ detached 
garage with underground electrical within a regulated area. Authorized Agent 
approval 07.16.26 
 
c. 17 Farmview Lane – S. Bernabucci c/o Juliano’s Pools – Permit request to install an 
18’ x 36’ inground swimming pool inclusive of patio and associated site 
improvements within a regulated area. Authorized Agent approval 07.17.26 
 
d. 13 & 14 Evangeline Place – Town of Granby – Permit request to install a storm 
drainage system as part of re-paving project. Authorized Agent approval 07.21.26 
 
K. Bednaz stated that she conducted a site visit at the Station 280 Apartment Complex to 
confirm the location of the excess scheduled plantings to the area where trash debris has been 
an issue. 
 
8. Commissioner Reports and Correspondence 
None 
 
9. Other Correspondence 
None 
 
10. Adjourn 
 
ON A MOTION by F. Jones seconded by N. Dethlefsen, the Commission voted 5-0-0 to 
adjourn the meeting at 9:51p.m. 
 
Respectfully submitted, 
 
 
 
Renee Deltenre 
Land Use Coordinator 
 
View the agenda PDF on this page (IWWC Agenda) Open the PDF
Text of the agenda (IWWC Agenda, 1 page)

Page 1 · open in PDF

Town of Granby 
Inland Wetlands and Watercourses Commission 
Regular Meeting Agenda 
Wednesday, August 12, 2026, at 7:00 pm 
Town Hall Meeting Room 
 
Please note: Any person who wishes to provide materials for display on the video monitors at an IWWC meeting where such monitors are being used 
to video conference the meetings must email the materials no later than 10 AM on the day of the meeting. All materials must be contained in a single 
attachment to the email.  Materials received after the 10 AM deadline will not be accepted for display. Display of the materials is subject to all other 
rules and procedures of the IWWC. Zip drive, memory sticks and other data storage devices will not be accepted. 
Zoom: https://us02web.zoom.us/j/81245552872?pwd=UxQHF44PB4btTxzwa1zqYeF4is75Ua.1 
Call In: 929-205-6099 
Meeting ID: 818 5055 7757 
Passcode: 902208 
 
1. Call to Order 
2. Action on the July 8, 2026, Meeting Minutes 
3. Permit Requests 
a. 5 Godard Road – H. Werner and S. Werner – Permit request to construct a single-family home and detached 
garage with associated site improvements within a regulated area. (Continued from 7/8/26) 
b. 215 Salmon Brook Street – Town of Granby – Permit request to construct a gazebo on a concrete pad within a 
regulated area. (Continued from 7/8/26) 
4. Request for Review 
a. 90 Salmon Brook Street and 35 Floydville – J. Gravel c/o Broadleaf Solar – RFR to address pre-existing 
soil/erosion concerns and establish a vegetative cover. (Received 7/8/26) 
5. Public Hearings 
a. 199 Broad Hill Road – T. Kurnicki – Permit request to construct a single-family home with associated site 
improvements within a regulated area. (Hearing opened and continued from 7/8/26)  
b. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in connection with the development 
of a 16-unit apartment building and associated site improvements. (Hearing opened and continued from 7/8/26) 
6. Show Cause Hearing 
a. 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a Regulated Activity without a valid IWWC Permit. 
(Continued from 7/8/26) 
7. Agent Report and Correspondence 
a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated Activity 
without a valid IWWC Permit. 
b. 55 Northwoods Road – M. Fusick – Permit request to construct a 32’ x 24’ detached garage with underground 
electrical within a regulated area. Authorized Agent approval 07.16.26 
c. 17 Farmview Lane – S. Bernabucci c/o Juliano’s Pools – Permit request to install an 18’ x 36’ inground 
swimming pool inclusive of patio and associated site improvements within a regulated area. Authorized Agent 
approval 07.17.26 
d. 13 & 14 Evangeline Place – Town of Granby – Permit request to install a storm drainage system as part of re-
paving project. Authorized Agent approval 07.21.26 
8. Commissioner Reports and Correspondence 
9. Adjourn 
Text of the packet (IWWC Meeting Packet, 116 pages)

Page 1

Town of Granby 
Inland Wetlands and Watercourses Commission 
Regular Meeting Agenda 
Wednesday, August 12, 2026, at 7:00 pm 
Town Hall Meeting Room 
 
Please note: Any person who wishes to provide materials for display on the video monitors at an IWWC meeting where such monitors are being used 
to video conference the meetings must email the materials no later than 10 AM on the day of the meeting. All materials must be contained in a single 
attachment to the email.  Materials received after the 10 AM deadline will not be accepted for display. Display of the materials is subject to all other 
rules and procedures of the IWWC. Zip drive, memory sticks and other data storage devices will not be accepted. 
Zoom: https://us02web.zoom.us/j/81245552872?pwd=UxQHF44PB4btTxzwa1zqYeF4is75Ua.1 
Call In: 929-205-6099 
Meeting ID: 818 5055 7757 
Passcode: 902208 
 
1. Call to Order 
2. Action on the July 8, 2026, Meeting Minutes 
3. Permit Requests 
a. 5 Godard Road – H. Werner and S. Werner – Permit request to construct a single-family home and detached 
garage with associated site improvements within a regulated area. (Continued from 7/8/26) 
b. 215 Salmon Brook Street – Town of Granby – Permit request to construct a gazebo on a concrete pad within a 
regulated area. (Continued from 7/8/26) 
4. Request for Review 
a. 90 Salmon Brook Street and 35 Floydville – J. Gravel c/o Broadleaf Solar – RFR to address pre-existing 
soil/erosion concerns and establish a vegetative cover. (Received 7/8/26) 
5. Public Hearings 
a. 199 Broad Hill Road – T. Kurnicki – Permit request to construct a single-family home with associated site 
improvements within a regulated area. (Hearing opened and continued from 7/8/26)  
b. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in connection with the development 
of a 16-unit apartment building and associated site improvements. (Hearing opened and continued from 7/8/26) 
6. Show Cause Hearing 
a. 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a Regulated Activity without a valid IWWC Permit. 
(Continued from 7/8/26) 
7. Agent Report and Correspondence 
a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated Activity 
without a valid IWWC Permit. 
b. 55 Northwoods Road – M. Fusick – Permit request to construct a 32’ x 24’ detached garage with underground 
electrical within a regulated area. Authorized Agent approval 07.16.26 
c. 17 Farmview Lane – S. Bernabucci c/o Juliano’s Pools – Permit request to install an 18’ x 36’ inground 
swimming pool inclusive of patio and associated site improvements within a regulated area. Authorized Agent 
approval 07.17.26 
d. 13 & 14 Evangeline Place – Town of Granby – Permit request to install a storm drainage system as part of re-
paving project. Authorized Agent approval 07.21.26 
8. Commissioner Reports and Correspondence 
9. Adjourn 

Page 2

Page 3

 
1 
MEETING MINUTES 
Town of Granby 
Inland Wetlands and Watercourses Commission 
Wednesday, July 8, 2026, at 7:00 pm 
 
PRESENT: Nick Dethlefsen, Barbara Schmitt, David Tolli, Susan Okie, John Laudati, and Fred 
Jones 
ALSO PRESENT: IWWC Agent Kate Bednaz and Land Use Coordinator Renee Deltenre 
 
1. Call to Order 
Chair J. Laudati called the meeting to order at 7:01 p.m. 
 
2. Action on the June 10, 2026, Meeting Minutes 
 
ON A MOTION by F. Jones seconded by D. Tolli, the Commission voted 5-0-1 to approve 
the June 10, 2026, minutes as presented. J. Laudati abstained. 
 
3. Permit Requests 
a. 94 Quarry Road – J. Fort – Permit request to place a 12’ x 28’ prefabricated garage 
on crushed stone within a regulated area.  
This application was received and continued from last month’s meeting. The property 
owner is seeking permission to place a 12’x28’ prefabricated garage on a 14’x30’ 
crushed stone base with underground electrical within an existing lawn area. The permit 
request also includes the removal of an existing shed, and the application has been 
updated to accommodate staff comments. A draft approval letter was provided to the 
Commission for review and consideration. 
 
ON A MOTION by S. Okie seconded by B. Schmitt, the Commission voted 6-0-0 to 
approve the application and draft approval letter as presented.  
 
J. Laudati recused himself at 7:05 p.m. 
 
b. 86 Case Street – J. Vosburgh – Permit request to construct a single-family home 
with associated site improvements within a regulated area.  
This application was received and continued from last month’s meeting. Applicant 
Jonathan Vosburgh was present to discuss the application and revisions that were made 
based on a site inspection conducted by Soil Scientist Ian Cole and Granby’s Wetlands 
Agent Kate Bednaz. Due to staff concerns regarding hydrology and the wetland 
delineation due to the placement of fill overtime, both staff and the applicant’s Soil 
Scientist found common ground with a revised wetland delineation. The orientation of 
the home has shifted slightly to the west, and a front walkway was added. The 
Commission discussed whether or not a full wetlands delineation should be required, and 
if not, outlined additional conditions of approval. 
 

Page 4

 
2 
ON A MOTION by B. Schmitt seconded by F. Jones, the Commission voted 5-0-0 to 
approve the application and draft approval letter as amended to include the following 
conditions: 
1. A Mylar copy of the approved plans shall be filed on the Land Records in the 
Office of the Town Clerk, prior to the issuance of a building permit.  
2. A Mylar copy of the final As-Built Drawing shall be filed on the Land Records in 
the Office of the Town Clerk, prior to the issuance of a Certificate of Occupancy. 
3. The wetland’s delineation as shown are “General Limits”, and any additional 
proposed activities will require the submittal of a new wetland delineation.  
 
J. Laudati was reseated at 7:37 p.m. 
 
c. 5 Godard Road – H. Werner and S. Werner – Permit request to construct a single-
family home and detached garage with associated site improvements within a 
regulated area. 
Property owners Harry and Susan Werner, as well as Professional Engineer Guy Hesketh 
were present to discuss the application. The owners are seeking permission to construct a 
3-bedroom single-story home with a detached garage, gravel driveway, paver walkway, 
front porch, rear deck and rear patio within a regulated area. Soil Scientist William 
Jackson conducted a wetlands delineation, and his report has been submitted as part of 
the application. There is an existing farm pond on the property, along with a narrow 
watercourse that flows towards the north as part of the East Branch of the Salmon Brook. 
All proposed activities are located within the 200-foot upland review area of the pond and 
80% within the 100-foot upland review area of the wetlands. G. Hesketh provided a 
thorough overview of the plans, including erosion and sedimentation control measures, 
site grading and drainage, septic design, etc.  
 
Perk testing has been conducted, and the proposed septic system will be located within 
the northeast corner of the site. Questions were raised regarding tree clearing limits and 
whether or not the house could be shifted to the west, farther away from the wetland’s 
boundary. At this time, the closest area of disturbance is approximately ten feet from the 
closest wetlands boundary; Wetlands Flag #A-16. S. Werner informed the Commission 
of their intent to establish a Conservation Easement over a large portion of the property, 
similar to their abutting properties to preserve land in its natural state. K. Bednaz will 
conduct a site visit and requested that the limits of clearing be better defined on the Site 
Plan and consideration be given to shifting the location of the house.  
 
ON A MOTION by D. Tolli seconded by S. Okie, the Commission voted 6-0-0 to 
receive and continue the application to the next regular meeting. 
 
J. Laudati recused himself at 8:15 p.m. 
 
d. 63 Harmony Hill Road – Roswell Development, LLC. – Permit request for an 8-lot 
single family residential subdivision and associated site work within a regulated 
area.  

Page 5

 
3 
Applicant Jonathan Vosburgh of Roswell Development, LLC was present to discuss the 
application. He is seeking permission to create eight additional lots as part of a re-
subdivision of an existing 6.45-acre parcel known as 63 Harmony Hill Road. Plans have 
been submitted to the Farmington Valley Heath District for review, and the applicant 
presents to the Planning and Zoning Commission next week. Soil Scientist Ian Cole 
conducted a wetlands delineation, and his report has been submitted as part of the 
application. Based on his findings, there are no wetlands or watercourses on the subject 
site, and there are no alluvial soils within 100’ of the property line. The brook located on 
the adjacent parcel known as 290 North Granby Road has clearly defined alluvial soils 
and is located more than 200 feet from the proposed activities.   
 
ON A MOTION by B. Schmitt seconded by N. Dethlefsen, the Commission voted 5-0-0 
to delegate the application to the IWWC Agent for review and approval. 
 
J. Laudati was reseated at 8:29 p.m. 
 
e. 215 Salmon Brook Street – Town of Granby – Permit request to construct a gazebo 
on a concrete pad within a regulated area.  
The Town of Granby is seeking permission to construct a 24’ x 12’ gazebo on a concrete 
pad just southeast of the dog park, parking lot located within the existing lawn area. The 
application also includes the installation of eight benches throughout the park along the 
walking trail. The benches will be anchored to an 8’ x 12’ concrete pad, allowing 
additional space for a wheelchair. Six inches of soil will be excavated, crushed stone will 
be added and compacted, and then the concrete pad will be poured.  
 
ON A MOTION by S. Okie seconded by F. Jones, the Commission voted 6-0-0 to 
receive and continue the application to the next regular meeting. 
 
4. Public Hearings 
a. 199 Broad Hill Road – T. Kurnicki – Permit request to construct a single-family 
home with associated site improvements within a regulated area.  
Applicant and property owner Thomas Kurnicki was present to discuss the application, 
which was received and discussed on May 13, 2026, and scheduled for a public hearing 
this evening. He is seeking permission to construct a single-family home so that he and 
his family can relocate from California. The 3.04-acre site consists of a challenging 
terrain with an intermittent watercourse, wetlands soils, a storm drainage ROW in favor 
of the Town of Granby and is located within the Salmon Brook upland review area. After 
discussion by the Commission at the May meeting, it was determined that a wetland 
delineation was required and the applicant has provided revised drawings, as well as a 
wetland/watercourse delineation report.  
 
A memorandum from Professional Engineer TJ Barresi was provided to the Commission, 
outlining responses to staff comments and concerns. T. Kurnicki ran through the 
revisions and noted that he is still waiting on approval from the Farmington Valley 
Health District. Concerns were raised regarding the limits of clearing, proposed grading 
and lack of a Landscaping Plan. TJ Barresi joined via Zoom to explain the design of the 

Page 6

 
4 
driveway and the grading necessary to meet the standards required as part of the 
Subdivision Regulations. A stone swale is proposed along the driveway to collect water 
as it runs down the hill, and the final proposed grades will have less slope than existing 
conditions. K. Bednaz recommended that the hearing remain open and requested that the 
applicant provide a Landscaping Plan, modify the construction sequence, enhance E&S 
control measures, utilize seed mixes for steep slopes, and prepare an invasive species 
management plan. There was no public comment.  
 
ON A MOTION by B. Schmitt seconded by S. Okie, the Commission voted 6-0-0 to 
continue the public hearing to the next regular meeting. 
 
b. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in 
connection with the development of a 16-unit apartment building and associated site 
improvements.  
Professional Engineer Rebecca Li was present to discuss the application, which was 
received and discussed on June 10, 2026, and scheduled for a public hearing this evening. 
The applicant is seeking to construct a 16-unit apartment complex on the existing 
foundation, which will consist of five 1-bedroom units and twelve 2-bedroom units. The 
subject property is approximately 111,198 square feet and located within the 100-foot 
wetland upland review area and 200-foot watercourse upland review area (Salmon Brook 
tributary). Site improvements include, but are not limited to, parking, utilities, stormwater 
management, site grading, landscaping, lighting, pavilion and dumpster enclosure. 
Proposed disturbance within the 200-foot upland review area is 10,145 square feet and 
proposed disturbance within the 100-foot upland review area is 4,642 square feet.  
 
R. Li provided an overview of the plans, including erosion and sedimentation control 
measures, site grading and drainage, septic design, etc. Perk testing has been conducted, 
and the proposed GST septic system will be located in front of the building, parallel to 
Hartford Avenue. Plans have been submitted to the Farmington Valley Health District 
and State of CT Department of Health for review. In response to Commissioner 
comments, a nitrogen dilution evaluation and sewer extension feasibility analysis were 
provided. An invasive species management plan will be provided, and additional 
plantings will be added at the top of the slope. R. Li requested that the hearing remain 
open so that revised plans may be presented to address staff comments at the next 
meeting.  
 
Public Comment 
Reinhard Maier, 138 Day Street, expressed concern and referenced the prior application 
from Vessel RE Holdings, LLC.   
 
Robert Flanigan, 24 Woodcliff Drive, expressed concerns regarding the potential impact 
of the development on the adjacent wetlands and watercourse.  
 
Attorney George Schober, Enfield, CT, spoke on behalf of his client Peter Voskowsky, 
who is an abutting property owner. His client is concerned with the potential for effluent 
to seep onto his property and requests a third-party independent review of the application.  

Page 7

 
5 
ON A MOTION by N. Dethlefsen seconded by F. Jones, the Commission voted 6-0-0 to 
continue the public hearing to the next regular meeting. 
 
J. Laudati recused himself at 9:25 p.m. 
 
5. Show Cause Hearing 
a. 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a Regulated Activity 
without a valid IWWC Permit.  
K. Bednaz stated that an Enforcement Order was issued on 7/2/26 to the owners of 7 
Laurel Drive, for the placement of a prefabricated shed, split rail fencing and 
underground drainage piping within a regulated area without a permit. Owners Colleen 
Fontaine and Ross Weiner were present to discuss the situation and noted that they have 
retained Attorney Kari Olson to assist with this matter and are engaging with a Soil 
Scientist. K. Bednaz conducted a site visit on 6/5/26 and provided background 
information on the property, including the prior Enforcement Order. At this time, erosion 
and sedimentation control measures have been installed at the request of staff and the 
property owners plan to have an application submitted in advance of the August meeting. 
 
ON A MOTION by F. Jones seconded by D. Tolli, the Commission voted 5-0-0 to 
uphold the Enforcement Order and continue to the next regular meeting. 
 
6. Agent Report and Correspondence 
a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – 
Conducting a Regulated Activity without a valid IWWC Permit. 
Attorney Timothy Furey was present on behalf of the property owner to provide updates. 
At this time, mapping has been completed by Robert Green Associates, LLC and Soil 
Scientist David Lord has flagged the property. The property owner has been working 
with the USDA on his proposed farming activities, and Attorney Furey anticipates that 
documentation will be provided within the next month. At the last meeting, the 
Commission made a motion requiring the submittal of the existing conditions plan for the 
entire site by the next meeting; however, this was not provided.  
 
ON A MOTION by J. Laudati seconded by B. Schmitt, the Commission voted 5-0-0 to 
continue this agenda item to the next regular meeting. 
 
J. Laudati was reseated at 9:44 p.m. 
 
b. 138 Day Street – Reinhard Maier c/o The Reinhard W. Maier Living Trust – Permit 
request to construct a 11.5’ x 26’ single-story rear addition within a regulated area. 
Authorized Agent approval 6/15/26. 
 
c. 65 Cider Mill Heights – C. Jensen – Permit request to place a 12’x16’ prefabricated 
shed on a 14’x18’ crushed stone base with future underground electrical conduit 
within a regulated area. Authorized Agent approval 6/24/26. 
 

Page 8

 
6 
d. 65, 79 and 87 Barkhamsted Road – C. McGee – Conducting a Regulated Activity 
without a valid IWWC Permit.  
A Notice of Violation was issued on 5/28/26 to the owner of 65, 79 and 87 Barkhamsted 
Road for the stockpiling of vehicles and various materials within the upland review area 
of the West Branch of Salmon Brook. K. Bednaz spoke with the property owner this 
afternoon regarding his property and regulated activities. Mr. McGee will be working 
with staff to address the matter, and updates will be provided as necessary. 
 
K. Bednaz also informed the Commission that the owners of the Station 280 Apartment Complex 
will install the excess scheduled plantings to the area where trash debris has been an issue.  
 
7. Commissioner Reports and Correspondence 
None 
 
8. Other Correspondence 
The Commission received email correspondence from Maureen Eberly in their meeting 
packet regarding weather patterns in Connecticut.  
 
9. Adjourn 
 
ON A MOTION by N. Dethlefsen seconded by J. Laudati, the Commission voted 6-0-0 to 
adjourn the meeting at 9:55 p.m. 
 
Respectfully submitted, 
 
 
 
Renee Deltenre 
Land Use Coordinator 
 

Page 9

Page 10

TOWN OF GRANBY 
Incorporated 1786 
15 North Granby Road 
Granby, Connecticut 06035-2102 
 
1 
August 12, 2026 
 
 
 
Harry and Susan Werner 
20 Godard Road 
North Granby, CT 06060 
 
RE: 5 Godard Road – H. Werner and S. Werner – Permit request to construct a single-family home 
and detached garage with associated site improvements within a regulated area. 
 
Dear Mr. & Mrs. Werner: 
 
Please be advised that on August 12, 2026, the Inland Wetlands and Watercourses Commission (IWWC) 
Agent approved the subject application in accordance with the application and supporting documentation 
received to date.  
 
The following are the conditions of this approval.  
 
1. Notification Requirements 
a. The Office of Community Development shall be notified at least 48 hours prior to the start of any 
activities; 
b. When barrier erosion controls have been installed prior to earth disturbance activities; and 
c. Upon completion of project activities. 
 
2. Municipal Inspection 
a. Town staff shall inspect installed erosion controls prior to the start of work that results in earth 
disturbance activities, this includes, but is not limited to, grubbing and stump removal. 
b. Standard inspections of the approved improvements shall be made throughout active 
construction and upon final stabilization of exposed soils to ensure regulatory compliance and 
protection of wetland resource areas. 
 
3. Prior to the start of work, the applicant shall submit a bond in the amount of $500 to the Town of 
Granby for payments made to the Town Wetlands Officer for monitoring the development for 
compliance with this approval. Should the costs exceed this amount the applicant will be billed for the 
difference. Any funds not used for the project will be remitted to the applicant at the conclusion of the 
project. As used in this condition, the term Town Wetlands Officer includes any person or firm 
designated by the Director of Community Development for the purposes of monitoring the 
development activities to assure compliance with this approval and the IWWC Regulations. 
 
4. A Mylar copy of the approved plans signed by the IWWC Chair shall be filed on the Land Records in 
the Office of the Town Clerk, prior to the issuance of a building permit.  
 
5. All work shall be in conformance with the approval and application materials as submitted for this 
Permit Approval. Any modifications to the approved plans must be reviewed and approved by the 
Granby Inland Wetlands and Watercourses Commission or their designated Agent.  
 
6. Erosion controls shall be maintained until the site has achieved permanent stabilization. Permanent 
stabilization is defined as 70% permanent vegetation covering over 90% of the area. A stockpile of 
erosion controls shall remain on site to prepare controls as necessary. The IWWC shall be notified in 
writing at least 48 hours in advance of erosion controls being removed.  
 

Page 11

5 Godard Road – New Single-Family Home 
8/12/26 Approval Letter 
 2  
7. Excavated soil shall not be brought off-property without the notification and approval of the Office of 
Community Development. The applicant shall supply the destination in writing for any excavated soil 
removed from the property.  
 
8. Only clean fill, free of invasive species, shall be brought on-site. Utilizing on-site fill will reduce, if not 
eliminate the potential for the introduction and potential colonization of new invasive species into this 
area of the watershed.   
 
9. The edge of clearing along the south side of the structures shall be monumented with 3’x3’ stone 
boulders with a placard attached to each as approved by the IWWC or their designated agent in 
writing.   
 
10. A Mylar copy of the final As-Built Drawing, depicting the approved wetland boundary and limit of 
vegetative clearing; shall be filed on the Land Records in the Office of the Town Clerk, prior to the 
issuance of a Certificate of Occupancy. 
 
11. This permit is valid for a period of 5 years from the date of issuance. 
 
If you have any questions, please call the Office of Community Development at your earliest convenience. 
 
Sincerely, 
 
 
 
John Laudati 
Granby IWWC Chairman 
 

Page 12

338.5
343.0
340.0
337.5
339.0
345.7
345.8
342.5
343.0
337.5
342.5
341.8
342.4
338.0
339.0
345.8
345.8
344.1
345.7
344.1
343.0
343.6
341.5
338.0
341.5
342.5
338.5
338.5
343.1
342.5
341.8
SOIL PROFILE
PERC TEST RESULTS
TEST PIT I.D.
PT-1 = 7.4 MIN./IN.
PT-2 = 6.7 MI./IN.
100.00
194

Page 13

NATIVE SOIL
PER DESIGN
DISTRIBUTION
BOX
SPECIFIED SAND
6"
84"
ELJEN MANTIS
SPECIFIED SAND
TOPSOIL
CLEAN BACKFILL
VEGETATIVE COVER
ø 4" WITH
HOLES AT 4, 8 
& 12 O'CLOCK
6" MIN
72"
6"
1"
NOTE: VENTING REQUIRED WHEN MORE THAN 18" OF COVER AS
MEASURESED FROM THE TOP OF THE UNIT TO FINISHED GRADE
18" MINIMUM FROM
BOTTOM OF UNIT TO
SEASONAL HIGH WATER TABLE 
5" MIN
12"
6"

Page 14

CONSTRUCTION SEQUENCE
In general, the overall project will follow the sequence below:
1. Contact "call before you dig" at 1-800-922-4455 at least 48
hours prior to the start of construction to have existing utilities
marked.  Attend a pre-construction meeting with the Town of
Granby staff, including the Wetlands Agent and Utility
Companies.
2. Install construction exit at site driveway.
3. Stake clearing limits.  Contact Town of Granby Wetlands
Agent to review proposed clearing.  Complete site clearing.
4. Install sediment fence (SFEC) and sediment log (SL)
perimeter controls in down-gradient areas, as shown on
Sheet SP-1, prior to the start of any excavation or grubbing.
5. Set up temporary soil stockpile area (TSS).  Strip topsoil in
areas of proposed septic field, house, garage and drives (see
clearing limits). Remove excess from site. Store topsoil to be
re-used in soil stockpile area.
6. Consruct retaining wall adjacent to driveway and rough grade
site.
7. Install processed stone base on drive.
8. Construct house and garage foundation and install septic
system components, well and utility services.
9. Finish grade, topsoil and seed area of septic field leach field
and utility trenches and other disturbed areas not subject to
further work. Install erosion control fabric on all disturbed
slopes 4:1 and steeper.
10. Complete house and garage construction.
11. Construct brick paver walkways.
12. Install bituminous pavement for driveway apron.  Place and
compact processed stone for gravel driveway
13. Finish grade site and place topsoil, seed and mulch.  Install
landscape materials.
14. Remove erosion controls after disturbed areas are
landscaped and mulched or new lawn areas are stabilized.
Complete final cleaning of storm sewer system.
15. The approximate date for start of construction is fall of 2026.
The estimated completion date is summer of 2027.

Page 15

Page 16

TOWN OF GRANBY 
Incorporated 1786 
15 North Granby Road 
Granby, Connecticut 06035-2102 
 
August 12, 2026 
 
 
 
Town of Granby 
15 North Granby Road 
Granby, CT 06035 
 
RE: 215 Salmon Brook Street – Town of Granby – Permit request to construct a gazebo on a concrete pad 
within a regulated area. 
 
Dear Town of Granby: 
 
Please be advised that on August 12, 2026, the Inland Wetlands and Watercourses Commission (IWWC) approved 
the subject application in accordance with the application and supporting documentation received to date. 
 
The following are the conditions of this approval.  
 
1. Permit includes the installation of eight benches on concrete pads throughout the park along the walking trail.  
 
2. The Office of Community Development shall be notified at least 48 hours prior to the start of any 
construction activities. 
 
3. Town staff shall inspect installed erosion controls prior to the start of any work that results in earth 
disturbance activities, this includes, but is not limited to, grubbing and stump removal.  
 
4. All work shall be in conformance with this approval and application materials as submitted for this Permit 
Approval. Any modifications to the approved plans must be reviewed and approved by the Granby Inland 
Wetlands and Watercourses Commission or their designated Agent. 
 
5. No materials may be deposited outside of the work area on the project site, without written approval from 
the IWWC or their designated Agent. 
 
6. Erosion controls shall be maintained until the site has achieved permanent stabilization. Permanent 
stabilization is defined as 70% permanent vegetation covering over 90% of the area. A stockpile of erosion 
controls shall remain on site to be installed, as necessary. The IWWC shall be notified in writing at least 48 
hours in advance of erosion controls being removed. 
 
7. Excavated soils shall not be brought off-property without the notification and approval of the Office of 
Community Development. The applicant shall supply the destination in writing for any excavated soil to be 
removed from the property. 
 
8. This permit is valid for a period of 5-years from the date of issuance. 
 
9. Upon completion of construction and site stabilization, the IWWC shall be notified in writing that work is 
complete, and a final inspection may be completed at that time. 
 
If you have any questions, please call the Office of Community Development at your earliest convenience. 
 
Sincerely, 
 
 
 
John Laudati 
Granby IWWC Chairman 

Page 17

Page 18

TOWN OF GRANBY
  Office of Community Development, Inland Wetlands and Watercourses Commission
Telephone: (860) 844-5318, www.granby-ct.gov
Application for Inland Wetlands & Watercourses Activity
Application For: Permit  Extension  Modification (Existing Permit/Application #):  __________________________
Wetlands Map Amend. Request for Review Other: 
Property Location and Nearest Intersection: 
Size of Parcel:_________ Zone: ________ Map/Lot: ____________ Current Use: ___________________________
Applicant’s Name:  
Complete Address:
Daytime Phone:   Evening Phone:  Fax:
Email:
Owner’s Name:
If the owner is a corporation, or other non-individual entity, include the primary contact information
Complete Address:  
Phone Daytime Phone: Evening Phone: Fax:
Applicant’s Representative:
Complete Address:  
Daytime Phone: Evening Phone: Fax:
*******************************PLEASE ATTACH ADDITIONAL SHEET IF NECESSARY**************************************
Project Name and Brief Description (i.e. residential, agricultural, commercial, number of lots, etc.):  
Is any portion of the property located within 500 feet of an adjoining municipality?  
Wetlands Located on Property (in square feet (sq. ft.)):   Wetlands to be impacted (sq. ft.):
Watercourses Located on Property?  Name or Type of Watercourse:  
Are Proposed Activities Located within the 100-Year Floodplain?  Floodway?  
Are there slopes with grades in excess of 15% located on the property?  
Do Proposed Activities Require Review by the PZC?  
*********SEE APPLICATION CHECKLIST ON BACK for MINIMUM APPLICATION REQUIREMENTS**********
The applicant understands that this application is to be considered complete only when all information and documents required by  
the Commission have been submitted. The undersigned warrants the truth of all statements contained herein and in all supporting
documents according to the best of his/her knowledge and belief. Permission is granted to the Town of Granby, Inland Wetlands & 
Watercourses Commission, and its agent (s) to inspect the subject land, at reasonable times, during the pendency of an application 
and for the life of the permit. 
Applicant’s Signature: Date:
Owner’s Signature:  Date:
FOR OFFICE USE
Application #: Date Submitted: 
Fee amt./Check or Cash: Date of Receipt: 
Agent Ruling: Date Approved/Denied: 
See Reverse Side for Conditions of Approval or Reason for Denial
Property is located east and northeast of Salmon Brook Fall (Route 10) and Floyville Road Intersection.
53/78/28 Nursery I215.36
Broadleaf Solar, LLC
Broadleaf Solar, LLC
207-239-8782 207-239-8782
No
01Mil +/-
X
No No
\HVEXWQRWVXEMHFWWRWKHIDUPLQJDFWLYLWLHV
No
unnamed tributaries to Salmon Brook 
To address pre-existing
Jonathan Gravel
jon.gravel@GHVUL.com
575 Fifth Ave., 24th Fl. | New York, NY 10017 
575 Fifth Ave., 24th Fl. | New York, NY 10017 
575 Fifth Ave., 24th Fl. | New York, NY 10017 
(212) 478-0000
(212) 478-0000
erosion concernsDQGSRRUVRLOFRQGLWLRQV,Broadleaf SolarKDV EHJDQVHHGLQJDFRYHUFURSVRUJKXP

Page 19

RQDSSUR[LPDWHDFUHVRISUHYLRXVQXUVHU\VLWH
RQSURSHUWLHVORFDWHGLQ*UDQE\7KHVHIDUPLQJDFWLYLWLHVDUHSODQQHGIRUKDUYHVWLQJDIRUDJHFURSDVZHOODVHVWDEOLVKLQJGHHSURRWLQJYHJHWDWLRQWR
GHYHORSERWKEHORZDQGDERYHJURXQGELRPDVVWRLQWURGXFHPLFURELRORJLFDOOLIHDQGRUJDQLFPDWHULDOWKDWH[LVWLQJVRLOODFNV$VSDUWRIWKHIDUPLQJ
DFWLYLWLHVQRZHWODQGZLOOEHLPSDFWVDQGWHPSRUDU\HURVLRQFRQWURORIILOWVRFNDQGVLOWIHQFHZLOOEHLQVWDOOHGLQDSSURSUDLWHORFDWLRQVWRSUHYHQWRIIVLWH
HURVLRQ
/0/202
0/0/202
g() p
HM001348
0000007472

Page 20

Disturbed Wetland In Field - Avoided
Approximately Locations of
Sediment Barriers ( "-----" )
Granby and East Granby
Town line

Page 21

Page 22

Page 23

Page 24

Page 25

Page 26

Page 27

TOWN OF GRANBY 
Incorporated 1786 
15 North Granby Road 
Granby, Connecticut 06035-2102 
 
1 
August 12, 2026 
 
 
 
Thomas Kurnicki 
1300 22nd Street 
Apartment #111 
San Francisco, CA 94107 
 
RE: 199 Broad Hill Road – T. Kurnicki – Permit request to construct a single-family home with 
associated site improvements within a regulated area. 
 
Dear Mr. Kurnicki: 
 
Please be advised that on August 12, 2026, the Inland Wetlands and Watercourses Commission (IWWC) 
Agent approved the subject application in accordance with the application and supporting documentation 
received to date.  
 
The following are the conditions of this approval.  
 
1. Notification Requirements 
a. The Office of Community Development shall be notified at least 48 hours prior to the start of any 
activities; 
b. When barrier erosion controls have been installed prior to earth disturbance activities; and 
c. Upon completion of project activities. 
 
2. Municipal Inspection 
a. Town staff shall inspect installed erosion controls prior to the start of work that results in earth 
disturbance activities, this includes, but is not limited to, grubbing and stump removal. 
b. Standard inspections of the approved improvements shall be made throughout active 
construction and upon final stabilization of exposed soils to ensure regulatory compliance and 
protection of wetland resource areas. 
 
3. Prior to the start of work, the applicant shall submit a bond in the amount of $500 to the Town of 
Granby for payments made to the Town Wetlands Officer for monitoring the development for 
compliance with this approval. Should the costs exceed this amount the applicant will be billed for the 
difference. Any funds not used for the project will be remitted to the applicant at the conclusion of the 
project. As used in this condition, the term Town Wetlands Officer includes any person or firm 
designated by the Director of Community Development for the purposes of monitoring the 
development activities to assure compliance with this approval and the IWWC Regulations. 
 
4. A Mylar copy of the approved plans signed by the IWWC Chair shall be filed on the Land Records in 
the Office of the Town Clerk, prior to the issuance of a building permit.  
 
5. All work shall be in conformance with the approval and application materials as submitted for this 
Permit Approval. Any modifications to the approved plans must be reviewed and approved by the 
Granby Inland Wetlands and Watercourses Commission or their designated Agent.  
 
6. Erosion controls shall be maintained until the site has achieved permanent stabilization. Permanent 
stabilization is defined as 70% permanent vegetation covering over 90% of the area. A stockpile of 
erosion controls shall remain on site to prepare controls as necessary. The IWWC shall be notified in 
writing at least 48 hours in advance of erosion controls being removed.  

Page 28

 
2 
 
7. Excavated soil shall not be brought off-property without the notification and approval of the Office of 
Community Development. The applicant shall supply the destination in writing for any excavated soil 
removed from the property.  
 
8. Only clean fill, free of invasive species, shall be brought on-site. Utilizing on-site fill will reduce, if not 
eliminate the potential for the introduction and potential colonization of new invasive species into this 
area of the watershed.   
 
9. A Mylar copy of the final As-Built Drawing, depicting the approved wetland boundary and limit of 
vegetative clearing; shall be filed on the Land Records in the Office of the Town Clerk, prior to the 
issuance of a Certificate of Occupancy. 
 
10. This permit is valid for a period of 5 years from the date of issuance. 
 
If you have any questions, please contact the Office of Community Development at your earliest 
convenience. 
 
Sincerely, 
 
 
 
John Laudati 
Granby IWWC Chairman 
 

Page 29

WETLAND AND SOIL SCIENCES & ENVIRONMENTAL CONSULTING 
P.O. Box 233 | Granville, MA 01034 413.695.2195 
freshwaterwetland@gmail.com 
 
 
 
 
 
 
 
August 6, 2026 
 
 
Re: 199 Broad Hill Road – Inland Wetlands Agent Review (2), Kate Bednaz  
 
 
The following are any outstanding  comments from my memo dated May 18, 2026  (normal font) and July 
6, 2026 (bold font) and comments related to the recently submitted materials or information provided 
in a CAPITOL LETTERS.  
 
1. Kevin Clark, Granby Town Engineer, provided his comments in the May 13, 2026 memorandum and 
a second memo dated July 2, 2026 in response to application and site plan revisions. Please 
work with Kevin to adequately address all remaining comments. KEVIN CLARK SUBMITTED HIS 
REVIEW COMMENTS IN THE AUGUST 4, 2026 MEMO.  
 
2. It is noted that the stormwater design, driveway location, and limits of grading will likely change from 
the current design due to Town Engineering comments and applicant modifications. The driveway and 
grading of the site have changed to require the slope from Broad Hill Road to the southerly 
property boundary to be almost entirely cleared and graded, totaling 1.5 acres of disturbance. 
While the clearing area may have been reduced, the grading area has been expanded. This 
increases the risk for a significant impact without and sometimes even with the proper 
management of the site while soils are exposed.  
a. Please recalculate the filing fee to include the URA calculations. Submit any additional funds 
to the Office of Community Development to complete your application. Will confirm with 
Town Staff and get back to you via email if there is any outstanding application fee. 
PLEASE RECALCULATE THE FILING FEE TO INLCUDE ANY ADDITIONS IN AREA FOR 
IMPERVIOUS SURFACES, WOODY CLEAR CUT, OR STEEP SLOPE DISTURBANCE FOR THE 
INITIAL AND THE FINAL SITE PLANS.  
 
b. The extensive clearing on a steep slope adjacent to Mountain Brook requires can 
make maintaining soil stability challenging. The potential for heavy rainstorms to 
impact the site while vegetation is removed, and before the site is permanently 
stabilized, if not properly prepared, could result in a significant impact to the 
downgradient wetland resource areas.   
 
Therefore, it is recommended that additional best management practices be designed 
into the project to be utilized during construction. This may include but not be limited 
to interceptor trenches and swales, slope side check dams, retaining walls, maintaining  
existing vegetation, etc. THE APPLICANT HAS ADDRESSED THIS CONCERN BY REDUCING 
THE AREA OF MATURE VEGETATION TO BE REMOVED, LOCATED INTERCEPTOR SWALES 
AND TEMPORARY BASINS, INSTALLED RETAINING WALLS TO REDUCE DISTURBANCE 
AREA, AND HAS PROPOSED A REVEGETATION PLAN.  
 
PLEASE DEFINE WHERE GRASSES AND GROUND COVER WILL BE PLANTED ON THE SITE 
PLAN. BESIDES THIS DETAIL, THIS COMMENT HAS BEEN ADDRESSED.  
 
c.      Due to the extensive clearing and grading proposed on the steep slope upgradient of 
the Mountain Brook, the IWWC may want to consider determining if this activity meets 
the definition of significant impact. Due to site conditions and the proposed disturbance 
area, it may meet more than one criterion for a significant impact. If the IWWC deems it 
is a significant impact, feasible and prudent alternatives are recommended to be 
evaluated by the applicant and their project team.  
 

Page 30

WETLAND AND SOIL SCIENCES & ENVIRONMENTAL CONSULTING 
P.O. Box 233 | Granville, MA 01034 413.695.2195 
freshwaterwetland@gmail.com 
 
3. The slope between the base of the driveway and the leach field is strongly recommended to remain 
undisturbed to aid in protecting the shade to the direct watershed of the Salmon Brook and be a buffer to 
construction at the top of the slope.  This recommendation was not incorporated in the most recent 
revisions. Please address this comment by evaluating the use of other design techniques that 
would leave woody interceptor vegetation on the slope or other BMPs as discussed previously. 
THIS COMMENT HAS BEEN ADQUEATELY ADDRESSED.  
4. Areas where vegetation is proposed to be cleared to create the necessary grades, please detail how 
these areas will be revegetated with herbaceous and native woody species. Native woody species 
have not been and are recommended to be specified in a detailed planting table. It is 
recommended that the same species that are proposed to be removed be replanted. PLEASE 
DEFINE WHERE GRASSES AND GROUND COVER WILL BE PLANTED ON THE SITE PLAN. 
OTHERWISE, THIS COMMENT HAS BEEN ADDRESSED.  
 
5. Please consider including at least a one-time removal of invasive species on your property as 
mitigation. Please have your expert provide an impact analysis as it relates to the proposed work and 
maintaining the functions and values of the adjacent wetland resource areas. We request that the 
applicant determine if they are willing to include invasive species removal in their 
mitigation plans to balance the impacts from development. This should be included in the 
expert’s analysis of the project as requested in the original comment. SHEET 9 OF 9 OF THE 
PLAN SET INCLUDES AN INVASIVE SPECIES INSPECTION. IT IS RECOMMENDED THAT THE 
PLAN BE REVISED TO INLCUDE INVASIVE SPECIES WITHIN THE LIMITES OF WETLANDS. 
THIS COULD BE LIMITED TO CUTTING AND REMOVAL WHEN THE PLAN IS TO LARGE TO 
REMOVE THE ROOTS WITH MINIMAL EARTH DISTURBANCE. PLEASE SPECIFY WHERE THE 
INVASIVE SPECIES WILL BE DISPOSED. PENDING THESE MODIFICATIONS THIS ITEM IS 
ADDRESSED. 
 
6. As this site is located within a NDDB polygon, it is recommended that this application 
remain open until correspondence has been received back from consultation with DEEP 
regarding any site development restrictions. This is not a requirement. THIS ITEM REMAINS 
OUTSTANDING. 
 
7. All erosion control blankets shall be constructed from a photodegradable or 
biodegradable material to prevent the unintended entanglement of stream corridor wildlife 
movements. PLEASE INCLUDE THIS REQUIREMENT ON THE SITE PLANS, SPECIFICALLY 
WHERE THE TURF REINFORMENT MAT IS DETAILED.  
 
8. Please provide the project sequence on the site plans. THIS ITEM HAS BEEN 
ADEQUATELY ADDRESSED.  
 
9. Please provide a maintenance plan for any stormwater management features. THIS 
ITEM HAS BEEN ADEQUATELY ADDRESSED.  
  

Page 31

Outlook
Re: 199 Broad Hill Road - Town Engineer Comments
From TJ Barresi <tjb@barresillc.com>
Date Thu 8/6/2026 11:49 AM
To Renee Deltenre <RDeltenre@granby-ct.gov>; Tomasz Kurnicki <tomasz.kurnicki@gmail.com>
Cc Granby Wetlands Agent <wetlandsagent@granby-ct.gov>; Kevin Clark <townengineer@granby-ct.gov>; Abigail Kenyon <akenyon@granby-ct.gov>
4 attachments (1 MB)
199BroadHill_DrainageArea.pdf; 199BroadHill_Addnm_3.pdf; 199BroadHill_Addnm_2.pdf; 199BroadHill_Addnm_1.pdf;
 
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
 
Greetings all....attached are ADDENDUMS 1, 2 & 3 in response to the latest memo dated August 4th.  To save paper and
eliminate confusion, I am holding off on full sets of full-size plans. 
These addendums show the changes made in RED for clarity and to ease your reviews.  If the project is approved, the final
drawings will have these changes, and any additional modifications or additions resulting from the hearing & approval
process.
To summarize...
I changed the proposed manhole to a type 'cl' catch basin.
The catch basin labels have been revised;
The catch basin detail has been revised;
I have added a sediment log detail, as shown;
The driveway contours have been redrawn to better demonstrate a cross-slope;
Notes exist on the plan and detail sheets indicating the driveway shall have a cross-slope;
Sediment Log (SL) was previously added to sheet 3 & sheet 8;
I am also attaching the Drainage Watershed Area Map for your reference.
Denno Surveying shared their topographic CAD file of the abutting property to help with my delineation.  I am currently
calculating the areas and generating a report in HydroCAD; but not finished yet.  I will send a completed report directly
to the town engineer, but wanted to get these to you and Rene before noon today, while I continue on tyhe drainage report.
If you have any questions, comments or concerns, please do noy hesitate.
Sincerely,
T. J. Barresi, P.E., L.S.
Barresi Associates LLC
1695 Poquonock Avenue
Windsor, CT  06095
Office:  860-219-9260
Cell:  860-519-3747
From: Renee Deltenre <RDeltenre@granby-ct.gov>
Sent: Tuesday, August 4, 2026 3:17 PM
To: TJ Barresi <tjb@barresillc.com>; Tomasz Kurnicki <tomasz.kurnicki@gmail.com>
Subject: 199 Broad Hill Road - Town Engineer Comments
 
Good Afternoon, 
Please see the latest comments from the Town Engineer regarding the revised plans dated 7/29/26.
Thank you,
Renee
                                                                                       
Renee Deltenre
Land Use Coordinator
Community Development, Building, Fire Marshal and Emergency Management Offices
Town of Granby
15 North Granby Road
Granby, CT 06035
(860) 844-5318

Page 32

Page 33

Page 34

Page 35

Page 36

 
Kevin Clark, PEL  (860) 844-5318 
Town Engineer  townengineer@granby-ct.gov 
Town of Granby   
15 North Granby Road   
Granby, CT 06035   
 
 
MEMORANDUM 
 
Date: August 4, 2026 
 
RE: “Residential Home Concept Plan , prepared for Thomas Kurnicki, 199 Broad Hill Road, Granby, 
Connecticut, Scale:1”=20’, March 30, 2026, Revised 6/30/26, Revised 7/29/26, Barresi Associates, 
LLC.” 
 
Comments: 
 
Sheet 2 of 6 
: 
1. Label “Yard Drain ” as a “ Catch Basin ” to match the detail sheet. Provide drainage 
computations.  The drainage area is a little over 4 acres. 
2. Is it possible to use a catch basin instead of a manhole to intercept the flow in the shoulder 
before it drains on the pavement? 
3. The original plan showed the driveway pitche d toward the swale to direct stormwater off 
the driveway.  The current plan should be revised to this configuration otherwise water will 
flow directly into the road. 
4. Add SL to legend and provide a detail on sheet 5. 
 
 
by: Kevin Clark, PEL, Town Engineer 
 

Page 37

Page 38

Page 39

Page 40

Page 41

Page 42

Page 43

Page 44

Page 45

Page 46

Page 47

Page 48

Page 49

WETLAND AND SOIL SCIENCES & ENVIRONMENTAL CONSULTING 
P.O. Box 233 | Granville, MA 01034 413.695.2195 
freshwaterwetland@gmail.com 
 
 
 
 
 
 
 
July 16, 2026 
 
 
Re: 199 Broad Hill Road – Inland Wetlands Agent Review (2), Kate Bednaz  
 
 
The following are any outstanding  comments from my memo dated May 18, 2026  and any new 
comments related to the recently submitted materials or information provided .  New comments are in 
BOLD. 
 
1. Kevin Clark, Granby Town Engineer, provided his comments in the May 13, 2026 memorandum and 
a second memo dated July 2, 2026 in response to application and site plan revisions. Please 
work with Kevin to adequately address all remaining comments.  
 
2. It is noted that the stormwater design, driveway location, and limits of grading will likely change from 
the current design due to Town Engineering comments and applicant modifications. The driveway and 
grading of the site have changed to require the slope from Broad Hill Road to the southerly 
property boundary to be almost entirely cleared and graded, totaling 1.5 acres of disturbance. 
While the clearing area may have been reduced, the grading area has been expanded. This 
increases the risk for a significant impact without and sometimes even with the proper 
management of the site while soils are exposed.  
a. Please recalculate the filing fee to include the URA calculations. Submit any additional funds 
to the Office of Community Development to complete your application. Will confirm with 
Town Staff and get back to you via email if there is any outstanding application fee.  
 
b. The extensive clearing on a steep slope adjacent to Mountain Brook requires can 
make maintaining soil stability challenging. The potential for heavy rainstorms to 
impact the site while vegetation is removed, and before the site is permanently 
stabilized, if not properly prepared, could result in a significant impact to the 
downgradient wetland resource areas.   
 
Therefore, it is recommended that additional best management practices be designed 
into the project to be utilized during construction. This may include but not be limited 
to interceptor trenches and swales, slope side check dams, retaining walls, maintaining  
existing vegetation, etc.  
 
c.      Due to the extensive clearing and grading proposed on the steep slope upgradient of 
the Mountain Brook, the IWWC may want to consider determining if this activity meets 
the definition of significant impact. Due to site conditions and the proposed disturbance 
area, it may meet more than one criterion for a significant impact. If the IWWC deems it 
is a significant impact, feasible and prudent alternatives are recommended to be 
evaluated by the applicant and their project team.  
 
3. The slope between the base of the driveway and the leach field is strongly recommended to remain 
undisturbed to aid in protecting the shade to the direct watershed of the Salmon Brook and be a buffer to 
construction at the top of the slope.  This recommendation was not incorporated in the most recent 
revisions. Please address this comment by evaluating the use of other design techniques that 
would leave woody interceptor vegetation on the slope or other BMPs as discussed previously.  
4. Areas where vegetation is proposed to be cleared to create the necessary grades, please detail how 
these areas will be revegetated with herbaceous and native woody species. Native woody species 
have not been and are recommended to be specified in a detailed planting table. It is 
recommended that the same species that are proposed to be removed be replanted.  

Page 50

WETLAND AND SOIL SCIENCES & ENVIRONMENTAL CONSULTING 
P.O. Box 233 | Granville, MA 01034 413.695.2195 
freshwaterwetland@gmail.com 
 
 
5. Please consider including at least a one-time removal of invasive species on your property as 
mitigation. Please have your expert provide an impact analysis as it relates to the proposed work and 
maintaining the functions and values of the adjacent wetland resource areas. We request that the 
applicant determine if they are willing to include invasive species removal in their 
mitigation plans to balance the impacts from development. This should be included in the 
expert’s analysis of the project as requested in the original comment. 
 
6. As this site is located within a NDDB polygon, it is recommended that this application 
remain open until correspondence has been received back from consultation with DEEP 
regarding any site development restrictions. This is not a requirement.  
 
7. All erosion control blankets shall be constructed from a photodegradable or 
biodegradable material to prevent the unintended entanglement of stream corridor wildlife 
movements.  
 
8. Please provide the project sequence on the site plans.  
 
9. Please provide a maintenance plan for any stormwater management features.  
 

Page 51

Page 52

TOWN OF GRANBY 
Incorporated 1786 
15 North Granby Road 
Granby, Connecticut 06035-2102 
 
1 
August 12, 2026 
 
 
 
Forrest Devine 
129 Lovers Lane 
Granville, MA 01034 
 
RE: 37 Hartford Avenue – F. Devine – Permit application for regulated activities in connection with the 
development of a 16-unit apartment building and associated site improvements. 
 
Dear Mr. Devine: 
 
Please be advised that on August 12, 2026, the Inland Wetlands and Watercourses Commission (IWWC) 
Agent approved the subject application in accordance with the application and supporting documentation 
received to date.  
 
The following are the conditions of this approval.  
 
1. Notification Requirements 
a. The Office of Community Development shall be notified at least 48 hours prior to the start of any 
activities; 
b. When barrier erosion controls have been installed prior to earth disturbance activities; and 
c. Upon completion of project activities. 
 
2. Municipal Inspection 
a. Town staff shall inspect installed erosion controls prior to the start of work that results in earth 
disturbance activities, this includes, but is not limited to, grubbing and stump removal. 
b. Standard inspections of the approved improvements shall be made throughout active 
construction and upon final stabilization of exposed soils to ensure regulatory compliance and 
protection of wetland resource areas. 
 
3. Prior to the start of work, the applicant shall submit a bond in the amount of $1,000 to the Town of 
Granby for payments made to the Town Wetlands Officer for monitoring the development for 
compliance with this approval. Should the costs exceed this amount the applicant will be billed for the 
difference. Any funds not used for the project will be remitted to the applicant at the conclusion of the 
project. As used in this condition, the term Town Wetlands Officer includes any person or firm 
designated by the Director of Community Development for the purposes of monitoring the 
development activities to assure compliance with this approval and the IWWC Regulations. 
 
4. A Mylar copy of the approved plans signed by the IWWC Chair shall be filed on the Land Records in 
the Office of the Town Clerk, prior to the issuance of a building permit.  
 
5. All work shall be in conformance with the approval and application materials as submitted for this 
Permit Approval. Any modifications to the approved plans must be reviewed and approved by the 
Granby Inland Wetlands and Watercourses Commission or their designated Agent.  
 
6. Erosion controls shall be maintained until the site has achieved permanent stabilization. Permanent 
stabilization is defined as 70% permanent vegetation covering over 90% of the area. A stockpile of 
erosion controls shall remain on site to prepare controls as necessary. The IWWC shall be notified in 
writing at least 48 hours in advance of erosion controls being removed.  
 

Page 53

37 Hartford Avenue – Apartments  
8/12/26 Approval Letter 
 2  
7. Excavated soil shall not be brought off-property without the notification and approval of the Office of 
Community Development. The applicant shall supply the destination in writing for any excavated soil 
removed from the property.  
 
8. Only clean fill, free of invasive species, shall be brought on-site. Utilizing on-site fill will reduce, if not 
eliminate the potential for the introduction and potential colonization of new invasive species into this 
area of the watershed.   
 
9. A Mylar copy of the final As-Built Drawing, depicting the approved wetland boundary and limit of 
vegetative clearing; shall be filed on the Land Records in the Office of the Town Clerk, prior to the 
issuance of a Certificate of Occupancy. 
 
10. This permit is valid for a period of 5 years from the date of issuance. 
 
If you have any questions, please call the Office of Community Development at your earliest convenience. 
 
Sincerely, 
 
 
 
John Laudati 
Granby IWWC Chairman 
 

Page 54

From: Kevin Clark
To: Abigail Kenyon
Cc: Kate Bednaz
Subject: 37 Hartford Ave
Date: Thursday, August 6, 2026 2:41:19 PM
Abby,
 
The applicant’s response dated August 5, 2026, addresses my comments dated June 15,
2026.
 
Kevin Clark, PEL
Town of Granby
15 North Granby Road
Granby, CT 06035
(860)844-5318
 

Page 55

 
 
 
 

Page 56

 
 
 
 
 
 
 
 
 

Page 57

 
 
 
 
 
 
 
 

Page 58

 
 
 
 
 
 
 
 

Page 59

 
 
 
 
 
 
 
 

Page 60

 
 
 
 
 
 
 
 

Page 61

 
 
 
 
 
 
 
 

Page 62

 
 
 
 
 

Page 63

 
 

Page 64

Snow Removal Plan Narrative 
37 Hartford Avenue – Granby, Connecticut 
General 
Snow removal operations shall be conducted to maintain safe access to the residential 
building while protecting the proposed stormwater management facilities, landscaped 
areas, sidewalks, utilities, and adjacent resource areas. Snow shall be plowed as soon as 
practical following snowfall events to maintain emergency vehicle access and adequate 
parking. 
Snow Plowing Operations 
Snow shall generally be pushed toward the western and eastern ends of the parking lot and 
away from building entrances, accessible parking spaces and top of slope along the 
southern side of the parking lots. 
Recommended plowing sequence: 
1. Clear the entrance drive from Hartford Avenue.  
2. Open the primary drive aisle to provide emergency vehicle access.  
3. Clear accessible parking spaces and pedestrian crossings.  
4. Plow remaining parking stalls toward designated storage areas (Refer to Attachment 
A for designated snow storage areas).  
5. Remove snow from sidewalks and building entrances.  
Designated Snow Storage Areas 
The primary snow storage locations shall be at the ends of the drive aisles, to the eastern 
and western sides of the parking lots. The area to the east of the pavilion is reserved for 
secondary snow storage if additional storage capacity is required. Snow stockpiles shall be 
maintained clear of the dumpster access and fire access routes. Refer to Attachment A for 
illustration of snow storage areas. 
If seasonal snowfall exceeds the available on-site storage capacity, accumulated snow 
shall be removed from the site and disposed of at an approved oƯ-site location. 
Snow Storage Restrictions 
Snow shall not be stored in the following locations: 
 Accessible parking spaces or access aisles.  

Page 65

 Sidewalks or pedestrian routes.  
 Fire lanes or emergency access areas.  
 Building entrances and exits.  
 Catch basins or drainage structures.  
 Landscaped islands containing shrubs or trees.  
 Within any drainage swales or stormwater management facilities.  
 Against retaining walls or utility equipment, including EV charging stations and 
transformers.  
 Within required sight triangles at the Hartford Avenue entrance.  
Stormwater Protection 
Snow shall be placed so that meltwater drains toward stabilized landscaped areas without 
causing erosion or concentrated runoƯ. 
Sand, debris, and accumulated winter sediment shall be removed from parking areas and 
catch basins following the winter season. 
Salt application shall be minimized while maintaining safe driving conditions. Application 
rates shall follow manufacturer recommendations and shall be reduced during late winter 
thaw events whenever practical. 
Sidewalk and ADA Access 
All sidewalks, curb ramps, and accessible parking spaces shall be maintained free of snow 
and ice throughout the winter season. Snow removed from accessible routes shall not be 
deposited within access aisles or pedestrian walkways. 
OƯ-Site Snow Removal 
Should snow accumulation reduce available parking or impede circulation, excess snow 
shall be hauled from the site to an approved disposal location. 
 

Page 66

ATTACHMENT A

Page 67

p p p p p p p p p p
p
p
p p
Hartford   Avenue
(CT - Route 189)
p p p p p
p
p
p p p
p
p
p
p
p
p
p p p p p
p
p
p
p p p p p p p p p p p p p p
p
p p p
p p p p
3-STORY RESIDENTIAL
BUILDING
±5,447 S.F. PER STORY
STOP
SNOW STORAGE PLAN
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION SNOW -
August 4, 2026

Page 68

Generated by eNDDB on:
6/9/2026
Nina Fazio
Towns: Granby
Automated Site Assessment: 1411576093
Subject: 37 Hartford Avenue
This is an automated site assessment and not a Natural Diversity Data Base determination. The
information provided represents a snapshot that can be used for general planning purposes. This
letter cannot be used to fulfill Endangered Species Act compliance requirements. Please see
information below as well as our FAQs describing the appropriate use and limitations of the
automated Site Assessment tool.
Current data maintained by the Natural Diversity Data Base (NDDB) and housed in the DEEP ezFile
portal, indicates that populations of the following State Endangered, Threatened, or Special Concern
species (RCA Sec. 26-306) have been documented within or in close proximity to the area
delineated. Please see the attached table for detailed species information.
HOW SITE ASSESSMENT SPECIES LISTS ARE COMPILED
Site assessment species lists include all information regarding listed species available to us at the
time of the request. This information is a compilation of data collected over the years by the
Department of Energy and Environmental Protection’s Natural History Survey and cooperating units
of DEEP, landowners, private conservation groups and the scientific community. New and updated
information is incorporated into the Data Base and accessed through the ezFile portal as it becomes
available. The species list provided is not necessarily the result of comprehensive or site-specific field
investigations.
WHAT PURPOSE DOES THIS SITE ASSESSMENT SERVE?
A site assessment is intended to provide a snapshot of the species that may be in the vicinity of your
drawn area. It may be useful in project planning or to gain an understanding of the potential for listed
species to utilize the site. The list is computer generated; it was not prepared or reviewed by program
staff. Biologist review of your location may result in the addition of species not provided by the
automated site assessment.
I’VE REVIEWED MY SITE ASSESSMENT, WHAT DO I DO NEXT?
If you are undertaking an activity that requires a state permit, utilizes state funding, or involves state
agency action, you must demonstrate compliance with the CT Endangered Species Act. This is done
through the full Natural Diversity Data Base review process. Please return to the DEEP’s ezFile Portal
and select Natural Diversity Data Base Review to begin this review process. Keep in mind that these
detailed reviews may include additional species not identified in the automated site assessment.
Program staff consider factors such as habitat characteristics, species life history and other
79 Elm Street
Hartford, CT 06106-5127
860.424.3011
portal.ct.gov/DEEP An Affirmative Action/Equal Opportunity Employer

Page 69

information to determine appropriate species of concern.
SURVEY WORK MAY BE NECESSARY
Suitable and potentially occupied habitat may extend beyond mapped NDDB areas and unmapped
areas may represent potential habitat that has not been adequately surveyed for all taxa. If you are
undertaking activities that involve significant ground disturbance, converting natural lands to
development, or otherwise fragmenting or disturbing large areas, we recommend conducting
comprehensive biological surveys and a full site habitat characterization for areas that have not been
assessed through prior biological inventories. Survey work may be required as part of the NDDB
review process; completing some or all of this work up front will allow the process to proceed more
efficiently.
This survey and habitat characterization should be comprehensive and not strictly limited to species
included in the site assessment. Field surveys should be performed by a qualified taxonomic expert
with the appropriate scientific collecting permits. Surveys should be conducted at seasonally
appropriate times.
A report summarizing the results of such surveys should include:
1. Survey date(s) and duration.
2. Site descriptions and photographs.
3. List of component vascular plant and animal species within the survey area (including scientific
binomials).
4. Data regarding population numbers and/or area occupied by State-listed species.
5. Detailed maps of the area surveyed including the survey route and locations of State listed
species.
6. Recommendations for management and protection of State-listed species with reference to
project activities.
7. Statement/résumé indicating the taxonomic expert’s qualifications.
Site survey reports should be sent to the CT DEEP-NDDB Program (deep.nddbrequest@ct.gov) for
further review by program biologists.
SENSITIVE SPECIES
Please note that, for purposes of automated site assessments, certain sensitive species are not
identified beyond their taxa. Additional information will be provided for those projects that will be
conducting survey work in preparation for permitting ground disturbing activities or for other activities
that might necessitate survey work. For these projects, please submit a Natural Diversity Data Base
Review Request and we will provide information to your taxonomic expert.
ADDITIONAL RESOURCES
The following resources may be helpful when planning survey work
• State Listed plant species and Natural Communities documented within each CT town
• Thirteen of Connecticut’s Most Imperiled Ecosystems (1998) - Metzler and Wagner
• The Vegetation of Connecticut - Metzler and Barrett
• Nature's Network identifies opportunities for conserving and connecting intact habitats and
ecosystems and supporting imperiled species.
• Connecticut’s Critical Habitat map. The Critical Habitat map project contains a subset of
79 Elm Street
Hartford, CT 06106-5127
860.424.3011
portal.ct.gov/DEEP An Affirmative Action/Equal Opportunity Employer

Page 70

known important natural community types and sites in CT. Refer to Resource Guide for a
complete description and limitations of this product.
Additional sites of Critical Habitats and important natural communities exist, some of which are
documented by NDDB and some of which have not been identified, or fully mapped or field
verified. You may contact NDDB prior to conducting field reviews for more comprehensive
information.
This letter is computer generated from our existing records and carries no signature. If however, any
clarification/error is noted, or, if you have further questions, please contact the following:
CT DEEP Bureau of Natural Resources
Wildlife Division
Natural Diversity Data Base
79 Elm Street
Hartford, CT 06106-5127
(860) 424-3011
deep.nddbrequest@ct.gov
Please include a snapshot of the map, your last name, and the subject area town when you e-mail or
write. Thank you for consulting the Natural Diversity Data Base.
Common Name Northern long-eared bat
Scientific Name Myotis septentrionalis
Listing Status
1
FE
Taxa mammal
General Ecology The Northern long-eared bat is one of the species most impacted by White
Nose Syndrome. Populations in Connecticut have declined by over 90%, and
it has been Federally listed as Endangered. During the summer northern
long-eared bats roost singly or in maternal colonies underneath bark, in
cavities or in crevices of both live trees and snags (dead trees). Males and
non-reproductive females may also roost in cooler places, like caves and
mines. Northern long-eared bats seem to be flexible in selecting roosts,
choosing roost trees based on suitability to retain bark or provide cavities or
crevices. This bat has also been found rarely roosting in structures, like barns
and sheds. Northern long-eared bats spend winter hibernating in caves and
mines, called hibernacula. The presence of northern long-eared bat (Myotis
septentrionalis), a federally endangered and state endangered species, may
require consultation with the US Fish and Wildlife Service Ecological Field
Office in order to be in compliance with the Federal Endangered Species Act if
the proposed project requires federal permits or uses federal funds. For more
information on federal requirements as well as guidance on the latest
management recommendations including development projects, wind energy
development, sustainable forest management, and other tools and FAQs,
please visit:
79 Elm Street
Hartford, CT 06106-5127
860.424.3011
portal.ct.gov/DEEP An Affirmative Action/Equal Opportunity Employer

Page 71

https://www.fws.gov/species/northern-long-eared-bat-myotis-septentrionalis
Common Name Tri-colored bat
Scientific Name Perimyotis subflavus
Listing Status
1
E
Taxa mammal
General Ecology Populations of Tri-colored bats have declined over 90% as a result of White
Nose Syndrome. This bat is associated with forested edges and open forested
landscapes with water features. Maternity colonies will form in tree cavities of
mature trees in a variety of tree species, especially oaks (Quercus spp.). They
often select roosts in tall, large-diameter trees, but will roost in smaller
diameter trees when potential roost substrate (e.g., leaf clusters, Spanish
moss) is present. They will occasionally roost on man-made structures. They
are among the most sensitive bats to cold temperatures and in winter they
hibernate in caves and abandoned mines where temperatures and humidity
levels are stable. Tri-colored bats have been proposed to be listed as
Federally Endangered. For more information and any federal requirements or
guidance on the latest management recommendations for development
projects, wind energy development, sustainable forest management, as well
as other tools and FAQs, please visit:
https://www.fws.gov/species/tricolored-bat-perimyotis-subflavus
Common Name Eastern pearlshell
Scientific Name Margaritifera margaritifera
Listing Status
1
SC
Taxa invertebrate
General Ecology This freshwater mussel species lives buried in clean, stable, mixed substrate
in fast-flowing unpolluted streams and rivers. Its host fish include Atlantic
salmon (Salmo salar), brook trout (Salvelinus fontinalis), brown trout (Salmo
trutta), rainbow trout (Onchorhynchus mykiss). Best habitats are good trout
streams that are heavily shaded by a riparian canopy, possess clean cold
water with high dissolved oxygen, and have stable channels with substrates of
coarse sand, gravel, and cobble. Factors that limit the eastern pearlshell are
changes to water quality, including eutrophication, acidification, sedimentation,
and increases in water temperature.
1
E = State Endangered, T = State Threatened, SC = State Special Concern, FE = Federally
Endangered, FT = Federally Threatened, NA = Not applicable.
79 Elm Street
Hartford, CT 06106-5127
860.424.3011
portal.ct.gov/DEEP An Affirmative Action/Equal Opportunity Employer

Page 72

37 Hartford Avenue Map
Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri
Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c)
OpenStreetMap contributors, and the GIS User Community
June 9, 2026
 
0 0.15 0.30.075 mi
0 0.25 0.50.125 km
1:9,597
Filing #0 ezFile NDDB System

Page 73

HARTFORD AVE
WINDMILL DR.
SHATTUCK AVE
RUSHFORD MEADE
BANK ST
OAKRIDGE DR
SITE
BY
Site Plans
AS PREPARED FOR
Proposed Residential Development
May 28, 2026
RLA Project Number: 251219
129 Lovers Lane
Granville, MA 01034
Mr. Forrest Devine
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
40 School Street  ·  Westfield, MA  ·  01085
ph 413.568.0985  ·  fax 413.568.0986
www.rlaland.com
R LEVESQUE
ASSOCIATES
INC
A LAND PLANNING SERVICES COMPANYR L A
DRAWING INDEX
SHEET NO. SHEET NAME ISSUE DATE REV. REV. DATE
T-1 TITLE SHEET 5/28/26 REV. A 8/4/26
EX-1 EXISTING CONDITIONS PLAN 5/27/26 REV. A 7/24/26
C-1 NOTES, SYMBOL & LINE LEGEND, AND ABBREVIATIONS 5/28/26 REV. A 8/4/26
C-2 CONSTRUCTION NOTES 5/28/26 REV. A 8/4/26
C-3 DEMOLITION AND REMOVALS PLAN 5/28/26 REV. A 8/4/26
C-4 LAYOUT AND MATERIALS PLAN 5/28/26 REV. A 8/4/26
C-5 GRADING, EROSION & SEDIMENTATION CONTROL PLAN 5/28/26 REV. A 8/4/26
C-6 DRAINAGE AND UTILITIES PLAN 5/28/26 REV. A 8/4/26
C-7 LANDSCAPING PLAN 5/28/26 REV. A 8/4/26
C-8 SEPTIC DESIGN PLAN 6/11/26 REV. A 8/4/26
SL-1 PHOTOMETRIC PLAN 5/28/26 REV. A 8/4/26
SL-2 LIGHTING FIXTURE DETAILS 5/28/26 REV. A 8/4/26
D-1 DETAILS 5/28/26 REV. A 8/4/26
D-2 DETAILS 5/28/26 REV. A 8/4/26
D-3 DETAILS 5/28/26 REV. A 8/4/26
D-4 DETAILS 5/28/26
D-5 DETAILS 5/28/26 REV. A 8/4/26
D-6 DETAILS 8/4/26
PERMITTING
NOT FOR CONSTRUCTION
Rev.: August 4, 2026

Page 74

p p p p p p p p p p
p
p
p p
Hartford   Avenue
EXISTING
FOUNDATION
WALLS
#41
#35
(CT - Route 189)
p p p p p p
p
p p p
p
p
p
p
p
p
p p p p p
p
p
p
p p p p p p p p p p p p p p p p p p p p p p
Limited Property/Boundary Survey
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - EXIST.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
DRAFTED BY:
As Noted
A.Z./J.L.
TBM Elevation Added
251219 37 Hartford Avenue
MLBU G-53/78/13
Granby, CT 06035
Forrest Devine
129 Lovers Lane
Granville, MA 01034
06-11-26
05-27-26
Iron Pins To Be Set Added 07-22-26
EX-1 A
ZONING REVIEW - Granby Center Zone
Commerial Center (COCE)
TYPE (MINIMUM) REQUIRED PROPOSED
AREA 20,000 SQ FT -
FRONTAGE 100 FT -
DEPTH 150 FT -
FRONT YARD 25 FT --
SIDE YARD 10 FT -
REAR YARD 20 FT -
HEIGHT (MAX) 3 STORIES (45 FT) -
BUILDING COVERAGE (MAX) 30% -
pppppp
C.S.P.C.S.
LOCUS MAP SCALE 1"=1000'

Page 75

NOTES, SYMBOL & LINE
LEGEND AND ABBREVIATIONS
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE_recover.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION C-1 A
X
pppppp
·
·
·
·
·
·
·
·
·
·
·
·
·
·
A. Town comments 8/4/26
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·

Page 76

CONSTRUCTION NOTES
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE_recover.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION C-2 A
A. Town comments 8/4/26

Page 77

p p p p p p p p p p
p
p
p p
Hartford   Avenue
EXISTING
FOUNDATION
WALLS
#41
#35
(CT - Route 189)
p p p p p
p
p
p p p
p
p
p
p
p
p
p p p p p
p
p
p
p p p p p p p p p p p p p p
p
p p p
p p p p
DEMOLITION & REMOVALS PLAN
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE_recover.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION C-3 A
A. Town comments 8/4/26

Page 78

p p p p p p p p p p
p
p
p p
Hartford   Avenue
(CT - Route 189)
p p p p p
p
p
p p p
p
p
p
p
p
p
p p p p p
p
p
p
p p p p p p p p p p p p p p
p
p p p
p p p p
3-STORY RESIDENTIAL
BUILDING
±5,447 S.F. PER STORY
STOP
LAYOUT & MATERIALS PLAN
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE_recover.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION C-4 A
ZONING REVIEW - COMMERCIAL CENTER (COCE)
TYPE (MINIMUM) REQUIRED EXISTING/PROPOSED
LOT AREA 20,000 FT2 111,184± FT2
LOT FRONTAGE 100 FT 170± FT
LOT DEPTH 150 FT 310± FT
FRONT YARD 25 FT 88.6± FT
SIDE YARD 10 FT 24.2± FT
REAR YARD 20 FT 177.2± FT
HEIGHT (MAX) 45 FT (3 STORIES) 3 STORIES
LOT COVERAGE (MAX) 30% 22.3%
LANDSCAPED AREA (MIN.) 20% 77.7%
PARKING 31 32
*PARKING REQUIREMENTS:
Multi-Family (2 bedrooms or more) - 2 spaces per unit
Thirteen (13) 2-bedroom units x 2 spaces/unit = 26 spaces
Multi-Family (1 bedroom) - 1.5 spaces per unit
Three (3) 1-bedroom units x 2 spaces/unit = 5 spaces
Total Required Parking Spaces = 31 spaces
A. Town comments 8/4/26

Page 79

p p p p p p p p p p
p
p
p p
Hartford   Avenue
(CT - Route 189)
p p p p p
p
p
p p p
p
p
p
p
p
p
p p p p p
p
p
p
p p p p p p p p p p p p p p
p
p p p
p p p p
3-STORY RESIDENTIAL
BUILDING
±5,447 S.F. PER STORY
FIRST STORY
F.F.E.=202.00±
SECOND STORY
F.F.E=213.75±
F.F.E.=202.50±
GRADING, EROSION &
SEDIMENTATION CONTROL PLAN
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION C-5 A
A. Town comments 8/4/26

Page 80

p p p p p p p p p p
p
p
p p
Hartford   Avenue
(CT - Route 189)
p p p p p
p
p
p p p
p
p
p
p
p
p
p p p p p
p
p
p
p p p p p p p p p p p p p p
p
p p p
p p p p
3-STORY RESIDENTIAL
BUILDING
±5,447 S.F. PER STORY
E
DRAINAGE & UTILITIES PLAN
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION C-6 A
A. Town comments 8/4/26

Page 81

p p p p p p p p p p
p
p
p p
Hartford   Avenue
(CT - Route 189)
p p p p p
p
p
p p p
p
p
p
p
p
p
p p p p p
p
p
p
p p p p p p p p p p p p p p
p
p p p
p p p p
3-STORY RESIDENTIAL
BUILDING
±5,447 S.F. PER STORY
E
STOP
SITE LANDSCAPING PLAN
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION C-7 A
A. Town comments 8/4/26

Page 82

E
HARTFORD AVE
PROPOSED RESIDENTIAL
BUILDING
EXISTING DRIVEWAY
HARTFORD AVE
SEPTIC DESIGN PLAN
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION C-8 A
PERC TEST #2 DATA
SEPTIC SYSTEM PROFILE
NO SCALE
PERC TEST #1 DATA
DISTRIBUTION BOX DETAIL
NO SCALE
≥
≥
≥
≥
GEOMATRIX GST6236  LEACHING SYSTEM - SECTION A-A'
GEOMATRIX GST6236  LEACHING SYSTEM - PLAN VIEW
≥
≥
≥
GEOMATRIX GST6236  LEACHING SYSTEM - SECTION B-B'
GEOMATRIX GST  LEACHING SYSTEM - INSPECTION PORT
June 11, 2026
SUBSURFACE SEWAGE DISPOSAL SYSTEM PLAN
LOCUS MAP SCALE 1"=1000'
A. CT Public Health Dept. comments 8/4/26

Page 83

Luminaire ScheduleQtyLabel
DescriptionTagLLF
LuminaireLumens
Luminaire
Watts
Total
Watts
3S4W
PROV2-36L-325-3K7-4W16 FTAG0.900381337.82113.46
1S5Q
PROV2-36L-325-3K7-5Q16 FTAG0.900415837.8237.82
1S4
PROV2-36L-295-3K7-4W16 FTAG0.900350134.134.1
1WP4F
BEACON: RWL1-48L-10-3K7-4F-UNV9' FTAG0.900123210.110.1
7WP4
BEACON: RWL1-48L-10-3K7-4W-U9' FTAG0.900128510.170.7
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.2
0.3
0.3
0.5
0.5
0.4
0.4
0.3
0.2
0.2
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.5
0.7
0.3
0.9
1.0
1.5
1.4
1.3
1.7
1.1
0.9
0.4
0.6
0.5
0.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.6
1.3
0.3
1.5
1.9
2.6
2.5
2.4
2.9
2.1
1.7
0.4
1.6
0.8
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.7
1.5
1.8
0.8
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.7
1.3
1.5
0.8
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.2
0.3
0.4
0.3
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.4
0.4
0.4
0.4
0.2
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.3
1.2
0.8
1.2
1.1
1.3
1.1
0.4
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.4
1.0
1.3
1.6
2.3
2.0
1.6
1.4
1.6
1.6
1.6
1.2
1.6
1.2
0.6
0.2
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.3
0.5
0.5
1.2
1.6
1.7
1.1
0.7
1.1
1.4
1.3
0.6
1.6
1.4
0.6
0.5
0.4
0.3
0.2
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.2
0.4
0.5
0.5
0.5
0.2
0.6
1.5
1.8
1.9
2.6
2.6
1.4
1.6
1.2
0.7
0.3
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.2
0.2
0.2
0.2
0.2
0.3
0.4
0.3
0.3
0.6
1.3
1.5
1.8
2.3
2.1
1.2
1.1
1.2
0.9
0.4
0.2
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.2
0.4
0.5
0.4
0.4
0.5
0.7
0.7
0.6
0.5
0.6
0.7
1.0
1.2
1.4
1.2
1.1
1.0
1.2
0.9
0.6
0.4
0.3
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.4
0.8
1.0
0.8
0.7
0.9
1.2
1.2
1.2
0.9
0.8
0.8
1.1
1.0
0.8
0.8
1.1
1.2
1.1
0.9
0.9
0.9
0.5
0.2
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.4
0.9
1.3
1.1
1.0
1.3
1.4
1.5
1.4
1.2
1.0
1.2
1.3
1.0
0.6
0.7
1.1
1.4
1.1
1.0
1.3
1.1
0.6
0.2
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.4
0.7
1.4
1.5
1.0
1.6
1.3
1.3
1.4
1.6
1.0
1.6
1.2
0.8
0.4
0.6
0.9
1.6
1.6
1.3
1.6
1.0
0.6
0.2
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.2
0.4
0.4
0.4
0.3
0.5
0.3
0.4
0.3
0.4
0.3
0.3
0.2
0.3
0.4
0.5
0.5
0.4
0.6
0.5
0.4
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.2
0.2
0.2
0.1
0.1
0.1
0.2
0.3
0.2
0.1
0.1
0.1
0.1
0.1
0.2
0.3
0.3
0.2
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.2
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.0
0.0
0.1
0.2
0.1
0.1
0.2
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Sheet 1 of 2
333 Pleasant Valley Road
South Windsor, CT 06074
(860) 282-0597
263 Winn Street
Burlington, MA 01803
(781) 935-8500
Drawing Number:
Detail: Photometric Calculation
Date: 07/27/2026
Revision:A
Scale:  1"=20'
Drawn By: MGS
Project:
37 Hartford Ave
Grandby, CT
Sheet 1 of 2
SL-1

Page 84

333 Pleasant Valley Road
South Windsor, CT 06074
(860) 282-0597
263 Winn Street
Burlington, MA 01803
(781) 935-8500
Drawing Number:
WP4/W4F - BEACON RATIO WALL
S4W / S5Q - VIPER AREA
Sheet 2 of 2
SL-2
Detail: Photometric Calculation
Date: 07/27/2026
Revision:A
Scale:  1"=20'
Drawn By: MGS
Project:
37 Hartford Ave
Grandby, CT

Page 85

DETAILS
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE_recover.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION D-1 A
SHRUB PLANTING DETAIL
TREE PLANTING DETAIL
ANTI-TRACKING APRON (AS REQ'D)
A
A
REINFORCED CONCRETE SIDEWALK SECTION
INLET PROTECTION - SEDIMENT FILTER SACK
MONOLITHIC CONCRETE CURB & SIDEWALK
BITUMINOUS CONCRETE PAVING DETAIL
SLOPE PROTECTION MATERIAL INSTALLATION (AS REQ'D)
6" BITUMINOUS CONCRETE LIP CURBING
HANDICAP PARKING STALL
EROSION CONTROL LOG
A. Town comments 8/4/26
STRAW BALE BARRIER

Page 86

DETAILS
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION D-2 A
TYPICAL SECTION - SEGMENTAL PRECAST CONCRETE RETAINING WALL
LIGHT POLE INSTALLATION DETAIL
DUMPSTER ENCLOSURE
STEEL BOLLARD WITH SIGN DETAIL
6' STANDARD SINGLE SIDE WHEEL STOP
A. Town comments 8/4/26
FENCEPOST TO RETAINING WALL ATTACHMENT
•
WOOD GUARDRAIL

Page 87

3-STORY RESIDENTIAL
BUILDING
±5,447 S.F. PER STORY
DETAILS
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE_recover.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION D-3 A
OUTLET CONTROL STRUCTURE (POCS-1)
INLET CONTROL STRUCTURE (PICS-1)
SUBSURFACE INFILTRATION BASIN  
CATCH BASIN
OR MANHOLE
SC-800 END CAP
OPTIONAL INSPECTION PORT
SC-800 CHAMBER
ONE LAYER OF ADSPLUS625 WOVEN GEOTEXTILE BETWEEN
FOUNDATION STONE AND CHAMBERS
5' MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS
24" (600 mm) HDPE ACCESS PIPE REQUIRED
USE END CAP PART #: SC800ECEZ
STORMTECH HIGHLY RECOMMENDS
FLEXSTORM INSERTS IN ANY UPSTREAM
STRUCTURES WITH OPEN GRATES
SUMP DEPTH TBD BY
SITE DESIGN ENGINEER
(24" MIN RECOMMENDED)
INSTALL FLAMP ON 24" (600 mm) ACESS PIPE
PART #: SC80024RAMP
ELEVATED BYPASS MANIFOLD
12" (300 mm) MIN 12"  MIN51"3" MINSUBGRADE SOILS
(SEE MANUFACTURER'S RECOMMENDATION)
PAVEMENT LAYER (DESIGNED
BY SITE DESIGN ENGINEER)
8' MAX
ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL
AROUND CLEAN, CRUSHED, ANGULAR STONE
*TO BOTTOM OF FLEXIBLE PAVEMENT. FOR
UNPAVED INSTALLATIONS WHERE RUTTING
FROM VEHICLES MAY OCCUR, INCREASE
COVER TO 21". 15"
6" MIN
EXCAVATION WALL
(CAN BE SLOPED OR VERTICAL)
PERIMETER STONE
(SEE MANUFACTURER'S RECOMMENDATION)
SC-800 END CAP
33"
6" MIN
GRANULAR WELL GRADED SOIL/AGGREGATE MIXTURES, <35%
FINES. COMPACT IN 6" LIFTS TO 95% STANDARD PROCTOR
DENSITY. SEE THE TABLE OF ACCEPTABLE FILL MATERIALS.
STORMTECH SC-800 ISOLATOR ROW DETAIL
STORMTECH SC-800 CROSS-SECTION
NOTE:
INSPECTION PORTS MAY BE CONNECTED THROUGH ANY CHAMBER CORRUGATION CREST.
STORMTECH CHAMBER
8" NYLOPLAST UNIVERSAL INLINE DRAIN
BODY (PART# 2708AG4IPKIT) OR TRAFFIC
RATED BOX W/SOLID LOCKING COVER
CONCRETE COLLAR
ASPHALT OVERLAY FOR
TRAFFIC APPLICATIONS
12" MIN WIDTH
8" MIN THICKNESS OF ASPHALT
OVERLAY AND CONCRETE COLLAR
CONCRETE COLLAR / ASPHALT OVERLAY
NOT REQUIRED FOR GREENSPACE OR
NON-TRAFFIC APPLICATIONS
4" SDR 35 PIPE
4" INSERTA TEE
TO BE CENTERED ON CORRUGATION CREST
NYLOPLAST 8" LOCKING SOLID
COVER AND FRAME
INSERTA TEE DETAIL
NTS
INSERTA TEE
CONNECTION
CONVEYANCE PIPE
MATERIAL MAY VARY
(PVC, HDPE, ETC.)
PLACE ADSPLUS WOVEN GEOTEXTILE
(CENTERED ON INSERTA-TEE INLET) OVER
BEDDING STONE FOR SCOUR PROTECTION AT
SIDE INLET CONNECTIONS. GEOTEXTILE MUST
EXTEND 6" PAST CHAMBER FOOT
INSERTA TEE TO BE
INSTALLED, CENTERED
OVER CORRUGATION
SIDE VIEWSECTION A-A
A
A
DO NOT INSTALL
INSERTA-TEE AT
CHAMBER JOINTS
NOTES:
· PART NUMBERS WILL VARY BASED ON INLET PIPE
MATERIALS. CONTACT STORMTECH FOR MORE
INFORMATION.
· CONTACT ADS ENGINEERING SERVICES IF INSERTA TEE
INLET MUST BE RAISED AS NOT ALL INVERTS ARE
POSSIBLE.
CHAMBER MAX DIAMETER OF INSERTA TEE HEIGHT FROM BASE OF CHAMBER (X)
SC-310 6" (150 mm) 4" (100 mm)
SC-800 10" (250 mm) 4" (100 mm)
DC-780 10" (250 mm) 4" (100 mm)
MC-3500 12" (300 mm) 6" (150 mm)
MC-4500 12" (300 mm) 8" (200 mm)
MC-7200 12" (300 mm) 8" (200 mm)
INSERTA TEE FITTINGS AVAILABLE FOR SDR 26, SDR 35, SCH 40 IPS
GASKETED & SOLVENT WELD, N-12, HP STORM, C-900 OR DUCTILE IRON
(X)
STORMTECH SC-800 INSPECTION PORT DETAIL STORMTECH INSERTA-TEE SIDE INLET DETAIL
A. Town comments 8/4/26

Page 88

DETAILS
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION D-4 -
(36" MIN)
7.08'
12" (MIN)
7.00'(MIN.)
[84.0"]
WATER QUALITY UNIT - BARRACUDA S4 (PWQU-1)
VARIABLE OUTLET LOCATIONS
VARIABLE INLET LOCATIONS
DOWNSPOUT COLLECTOR DETAIL
PRECAST CONCRETE CATCH BASIN
ADS NYLOPLAST YARD DRAIN BASIN
STANDARD DRAINAGE MANHOLE DETAIL

Page 89

DETAILS
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE_recover.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION D-5 A
A. Town comments 8/4/26
SIGN SUMMARY

Page 90

COMPLIANCE NOTES
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE_recover.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION D-6 -
August 4, 2026
STORMWATER INSPECTION & MAINTENANCE PROCEDURE & CHECKLIST INVASIVE SPECIES MANAGEMENT PLAN
The following management measures shall be implemented for the proposed improvements at 37 Hartford Avenue. All invasive species management activities
shall be coordinated with a qualified professional experienced in the identification and treatment of invasive plant species.
a. Pre-Construction
Prior to the installation of mitigation plantings, the designated mitigation area shall be inspected by a qualified professional knowledgeable in the identification
of invasive plant species. Existing invasive vegetation shall be identified and clearly marked for the contractor or personnel responsible for removal.
Targeted invasive plants, including root systems to the maximum extent practicable, shall be removed from the site and disposed of at an approved off-site
disposal facility. Hand removal methods shall be utilized whenever feasible to minimize disturbance to existing soils and native vegetation. Where hand removal
is not practical, a small excavator may be used, provided that disturbance to surrounding soils and vegetation is minimized to the greatest extent practicable.
b. During Construction
Construction activities shall be conducted in a manner that minimizes soil disturbance and prevents the spread of invasive plant material and propagules. The
following practices shall be implemented throughout construction:
1. Limit all earth disturbance to within the approved limits of work and installed erosion and sediment controls.
2. Clean construction equipment, vehicles, and landscaping equipment as necessary to remove soil, seeds, root fragments, and other plant material prior to
entering or leaving the project site.
3. Utilize only certified weed-free plant material, mulch, topsoil, and seed mixes obtained from reputable suppliers.
4. Avoid unnecessary disturbance or damage to existing native vegetation during invasive species removal and construction activities.
5. Immediately collect all invasive plant cuttings and removed material and place them directly into bags or covered containers for off-site disposal. Removed
material shall not be stockpiled on-site.
6. Under no circumstances shall invasive plant material, cuttings, or other vegetative debris be placed within or allowed to enter wetlands, watercourses, or
other regulated resource areas, even on a temporary basis.
c. Post-Construction Monitoring
Invasive species management shall continue following completion of construction for a minimum period of three (3) years or as required by the municipal
Inland Wetlands and Watercourses Commission.
The mitigation area shall be inspected at least twice annually, once during the spring growing season and once during the early fall, to identify the presence or
re-establishment of invasive plant species. Additional inspections may be conducted as necessary based on site conditions.
Any invasive species identified during the monitoring period shall be removed or treated in accordance with the procedures outlined in Section 2(d). Monitoring
shall also evaluate the successful establishment of native mitigation plantings and identify any maintenance measures necessary to ensure their long-term
success.
d. Invasive Species Treatment
Due to the proximity of regulated wetland resource areas, invasive plant species should be controlled using methods that minimize impacts to adjacent native
vegetation and sensitive environmental resources.
Mechanical removal shall be the preferred treatment method where practical. During the active growing season, invasive plants should be cut by hand while in
full leaf to reduce their ability to photosynthesize and regenerate. Where appropriate, root systems shall be mechanically removed to the maximum extent
practicable.
Where mechanical removal alone is determined to be ineffective, targeted application of an NRCS-approved or otherwise appropriately registered herbicide
may be utilized on cut stems by a licensed applicator. Herbicide applications shall be performed in strict accordance with all applicable federal, state, and local
regulations, including those governing applications adjacent to wetlands and watercourses.
Because many invasive species readily regenerate from root systems or vegetative fragments, multiple treatment cycles may be required to achieve effective
control. Care shall be taken throughout removal operations to prevent the spread of cuttings or root fragments capable of re-establishment.
Prior to any herbicide application, the Project Proponent shall provide the Town of Granby Inland Wetlands Agent with the name, license information, and
contact information of the licensed herbicide applicator responsible for performing the work.
e. Reporting and Coordination
Upon completion of each invasive species management event, the Project Proponent or the Proponent's designated contractor shall notify the Town of Granby
Inland Wetlands and Watercourses Commission that the work has been completed.
Each notification shall include a brief summary describing:
· The date(s) the work was performed;
· The invasive species identified;
· The treatment methods implemented;
· Areas treated;
· Any herbicides applied, if applicable; and
· Recommendations for any follow-up monitoring or additional treatment.
The Project Proponent is encouraged to coordinate periodically with the Town of Granby Inland Wetlands Agent throughout the monitoring period to review the
effectiveness of management activities and identify any additional areas requiring treatment.

Page 91

Page 92

Outlook
RE: Granby NOV No. DS-2025-1061V
From Matt <Rec6671@comcast.net>
Date Tue 8/4/2026 8:46 AM
To Malinowski, Kathryn <Kathryn.Malinowski@ct.gov>
Cc Granby Wetlands Agent <wetlandsagent@granby-ct.gov>; Laskin, Anna <Anna.Laskin@ct.gov>; Renee
Deltenre <RDeltenre@granby-ct.gov>; Mirza, Akhila <Akhila.Mirza@ct.gov>; Robert Green Associates
<green@rga-ct.com>; tfurey@fureydonovan.com <tfurey@fureydonovan.com>; Yacavone, Chris
<Chris.Yacavone@ct.gov>
3 attachments (20 MB)
13948.jpg; 13947.jpg; 13946.jpg;
 
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender
and know the content is safe.
 
Good morning these pictures were taken August 4th 7:00 in the morning. The two pictures with the
wood structure we're at the property line downstream. Pictures were upstream from the property line.
Erosion controls are all working well.
On Jul 8, 2026 1:29 PM, "Malinowski, Kathryn" <Kathryn.Malinowski@ct.gov> wrote:
Good afternoon,
 
I was able to connect with Matt regarding the NOV yesterday. Topographic mapping has been
completed and sent to the engineer working on the pre-liminary plans. Once the Dam Safety
Program has received these plans our staff will review and request any additional information if
required. I will also follow up with you so that the Town of Granby is included in updates on the
progress.
 
Please feel free to reach out with any additional questions.
 

Page 93

Page 94

Page 95

Page 96

Page 97

Page 98

Outlook
Fw: Granby NOV No. DS-2025-1061V
From Granby Wetlands Agent <wetlandsagent@granby-ct.gov>
Date Mon 8/3/2026 12:46 PM
To Matt <rec6671@comcast.net>; Abigail Kenyon <akenyon@granby-ct.gov>; Renee Deltenre
<RDeltenre@granby-ct.gov>
Abby and Renee - forwarding it to you as well, somehow you fell off the email chain. 
SINCERELY, 
THE GRANBY INLAND WETLANDS AGENT
From: Granby Wetlands Agent <wetlandsagent@granby-ct.gov>
Sent: Monday, August 3, 2026 12:45 PM
To: Matt <Rec6671@comcast.net>
Subject: Re: Granby NOV No. DS-2025-1061V
 
Thank you, Matt, for the photographs. It looks like flow is free of sediment and we will be receiving more
photographs from you with all this rain. Please add the date and time the photos where taken. 
I have been asked to refer your violation to our Town Attorney as no items of documentation, resolution,
and mitigation have been supplied to the town as of yet. I am hoping you are able to submit as much
information that you have at this time to present to the Commission to demonstrate your due diligence
and efforts to comply with municipal law/requirements. As a reminder, the town has taken jurisdiction
of the area outside of the dam; this process is separate from the state process as it relates to the dam's
construction and jurisdiction. The IWWC retained the right to continue with mitigation requirements in
all areas outside of the dam footprint. There was no objection to the assertation from you or your
representatives. 
The IWWC has requested information be supplied many months ago, and it sounds like some of this
information is currently available. Please confirm if you will be submitting any existing conditions,
mitigation plans, and other required EO information prior to our meeting on August 12, 2026. It is our
opinion that a concurrent review with state programs will be beneficial in a speedy and cohesive
mitigation plan and resolution to the current violation on your properties. The IWWC continues to
operate under their designated authority, and submission of the required EO resolution/documentation
materials is becoming excessively overdue. 
If there is no movement forward with the IWWC EO requirements for the August 12th IWWC regular
meeting, the Town of Granby IWWC will be elevating this to our Town Attorney for potential civil action.

Page 99

Please respond as soon as possible with EO required resolution materials and current site photographs
of post/during the most recent rainfall. Thank you in advance. 
SINCERELY, 
THE GRANBY INLAND WETLANDS AGENT
From: Matt <Rec6671@comcast.net>
Sent: Thursday, July 30, 2026 8:56 PM
To: Granby Wetlands Agent <wetlandsagent@granby-ct.gov>
Cc: Abigail Kenyon <akenyon@granby-ct.gov>; Renee Deltenre <RDeltenre@granby-ct.gov>
Subject: Re: Granby NOV No. DS-2025-1061V
 
 
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender
and know the content is safe.
 
On Jul 30, 2026 8:53 PM, Matt <Rec6671@comcast.net> wrote:
On Apr 8, 2026 3:26 PM, Matt <Rec6671@comcast.net> wrote:
Good afternoon thought I would give you an update for your meeting tonight. I had to retain a
different engineer they were not able to give me a time frame as to when they were going to be
able to locate flagging and create topo. I sense then hired a different engineer Green associates
out of terryville. They will be out to the site in the next week and a half and should be able to
provide a plotted map by the 23rd of April. At that point Carl the structural engineer will be able
to provide a preliminary report to the state. NRCS contacted me with their soil scientist and they
are doing their own delineation of the property they are almost complete. So to sum this up I
believe you're following meeting we should have something on paper with delineation I am
hoping Carl can have something to me for the next meeting but that might be pushing it but I will
do my best.
             Matt 
If you have any questions please feel free to either email or call and I will do my best to get them
answered thank you
On Mar 15, 2026 6:06 PM, Granby Wetlands Agent <wetlandsagent@granby-ct.gov> wrote:
Hi Matt, 
Thank you for calling with an update. Sue and I will see you this Thursday at 9:30 am to check
out the property. 
SINCERELY, 
THE GRANBY INLAND WETLANDS AGENT

Page 100

Page 101

TOWN OF GRANBY 
Incorporated 1786 
15 North Granby Road 
Granby, Connecticut 06035-2102 
 
July 16, 2026 
 
 
Michael Fusick 
55 Northwoods Road 
North Granby, CT 06060 
 
RE: 55 Northwoods Road – M. Fusick – Permit request to construct a 32’ x 24’ detached garage with 
underground electrical within a regulated area.  
 
Dear Mr. Fusick: 
 
Please be advised that on July 16, 2026, the Inland Wetlands and Watercourses Commission (IWWC) 
Agent approved the subject application in accordance with the application and supporting documentation 
received to date.  
 
The following are the conditions of this approval.  
 
1. The Office of Community Development shall be notified at least 48 hours prior to the start of any 
construction activities. 
 
2. Town staff shall inspect installed erosion controls prior to the start of any work that results in earth 
disturbance activities, this includes, but is not limited to, grubbing and stump removal. 
 
3. All work shall be in conformance with the approval and application materials as submitted for this 
Permit Approval. Any modifications to the approved plans must be reviewed and approved by the 
Granby Inland Wetlands and Watercourses Commission or their designated Agent.  
 
4. Erosion controls shall be maintained to prevent sediment migration from the project area until the site 
has achieved permanent stabilization. Permanent stabilization is defined as 70% permanent 
vegetation covering over 90% of the area. A stockpile of erosion controls shall remain on site to 
prepare controls as necessary. The IWWC shall be notified in writing at least 48 hours in advance of 
erosion controls being removed.  
 
5. Excavated soil shall not be brought off-property without the notification and approval of the Office of 
Community Development. The applicant shall supply the destination in writing for any excavated soil 
removed from the property.  
 
6. This permit is valid for a period of 5 years from the date of issuance. 
 
7. Upon completion of construction and site stabilization, the IWWC shall be notified in writing that work 
is complete, and a final inspection may be completed at that time. 
 
If you have any questions, please call me at your earliest convenience.  
 
Sincerely, 
 
 
 
Kate Bednaz 
Town of Granby  
IWWC Wetlands Agent 

Page 102

Page 103

Page 104

Page 105

Page 106

Page 107

TOWN OF GRANBY 
Incorporated 1786 
15 North Granby Road 
Granby, Connecticut 06035-2102 
 
July 20, 2026 
 
 
Sara Bernabucci 
Juliano’s Pools and Spas 
321 Talcottville Road 
Vernon, CT 06066 
 
RE: 17 Farmview Lane – S. Bernabucci c/o Juliano’s Pools – Permit request to install an 18’ x 36’ 
inground swimming pool inclusive of patio and associated site improvements within a regulated area. 
 
Dear Ms. Bernabucci: 
 
Please be advised that on July 17, 2026, the Inland Wetlands and Watercourses Commission (IWWC) 
Agent approved the subject application in accordance with the application and supporting documentation 
received to date.  
 
The following are the conditions of this approval.  
 
1. The Office of Community Development shall be notified at least 48 hours prior to the start of any 
construction activities. 
 
2. Town staff shall inspect installed erosion controls prior to the start of any work that results in earth 
disturbance activities, this includes, but is not limited to, grubbing and stump removal. 
 
3. All work shall be in conformance with the approval and application materials as submitted for this 
Permit Approval. Any modifications to the approved plans must be reviewed and approved by the 
Granby Inland Wetlands and Watercourses Commission or their designated Agent.  
 
4. Erosion controls shall be maintained until the site has achieved permanent stabilization. Permanent 
stabilization is defined as 70% permanent vegetation covering over 90% of the area. A stockpile of 
erosion controls shall remain on site to prepare controls as necessary. The IWWC shall be notified in 
writing at least 48 hours in advance of erosion controls being removed.  
 
5. Excavated soil shall not be brought off-property without the notification and approval of the Office of 
Community Development. The applicant shall supply the destination in writing for any excavated soil 
removed from the property.  
 
6. This permit is valid for a period of 5 years from the date of issuance. 
 
7. Upon completion of construction and site stabilization, the IWWC shall be notified in writing that work 
is complete, and a final inspection may be completed at that time. 
 
If you have any questions, please call me at your earliest convenience.  
 
Sincerely, 
 
 
 
Kate Bednaz 
Town of Granby  
IWWC Wetlands Agent 

Page 108

Page 109

Page 110

Page 111

Page 112

Page 113

Page 114

Page 115

EVANGELINE   PLACE
TYPE 'C' C.B. #1
T.F. = 200.50
INV.196.25
11.25° BEND
INV.195.96
202
203
28'
201
58 L.F.-15" CPEP-S WT @ 0.50%
45'
F.E.S. INV.=195.70
52 L.F.-15" CPEP-S WT @ 0.50%
25'
(MIN.)
RIP RAP PAD
ECM CHANNEL
DEMO EXIST. PVMT.
FINE GRADE, LOAM & SEED
25'
(MIN.)
SED. LOGS (TYP.)
REGRADE EXISTING DRIVEWAY
200.90
TYPE 'C' C.B. #2
T.F. = 200.45
INV.196.75
46 L.F.-15" CPEP-S WT @ 1.09%
B.C.L.C.
LEGEND
UTILITY POLE
WETLANDS
BUILDING SETBACK LINE
PROPERTY LINE
PROPOSED
SPOT GRADE
CATCH BASIN
MANHOLE
EASEMENT
CONTOUR
STORM SEWER
CURB
SF SF SF SILT FENCE
PROPOSED
TYPICAL
EXISTING
TYP.
PROP.
UPLAND REVIEW AREA
SEDIMENT CONTROL LOG
SOIL BOUNDARY & TYPE43B
186.00
CONTRACT LIMIT LINE
GRANBY TOWN HALL
15 NORTH GRANBY ROAD
GRANBY, CONNECTICUT 06035
PHONE: (860) 844-5318     FAX:  (860) 844-5325
TOWN OF GRANBY
ENGINEERING DEPARTMENT
SCALE: DATE: JOB #: SHEET:
1"=20' JULY 16, 2026 2026.G03 1  OF 2
TOWN OF GRANBY
PLAN SHOWING PROPOSED STORM DRAINAGE
EVANGELINE PLACE
GRANBY, CONNECTICUT
NO. DATE DESCRIPTION
REVISIONS
UTILITY WARNING
The locations of existing underground utilities are shown in an approximate way only and have not been independently
verified by the Owner or its representative.  Utilities not shown on this plan may exist. The Contractor shall determine the
exact location of all existing utilities before commencing work, and agrees to be fully responsible for any and all damages
which might be occasioned by the Contractor's failure to exactly locate and preserve any and all underground utilities.
The Contractor shall use CALL BEFORE YOU DIG, 811, or contact CBYD.com prior to any construction activity.

Page 116

5'-4"
(DEPTH 10')
SECTION A-A SECTION B-B
TYPE "C" & "C-L" CATCH BASIN - PRECAST CONCRETE DETAIL
(NOT TO SCALE)
6'-0"
(WHERE DEPTH
 IS > 10' & < 20')
SUMP UNIT
RISER W/KNOCKOUTS
AS REQUIRED
4"
(MIN.)
RISER (12" TO 48")
REDUCER (6" TO 18")
SPACER 2" MIN. TO 6" MAX.
CMU OR PRECAST W/REINFORCING
2'-9"
(±1")
4'-4"
(DEPTH 10')
5'-0"
(WHERE DEPTH
 IS > 10' & < 20')
6"
(MIN.)
1'-8" ("C")
2'-2" ("CL")
4'-0"3'-0"
PLAN
A
B
A
B
5'-4"
4'-4"
CATCH BASIN MATERIALS AND CONSTRUCTION
TO COMPLY WITH CTDOT FORM 819
WALL THICKNESS
TO BE INCREASED
 TO 12" WHEN THIS
DIMENSION >10'
SUMP DEPTH
= 2'-0" MIN.
(OR AS NOTED)
SPECIAL NOTE:
WHERE A.D.A. GRATE IS SPECIFIED FOR A TYPE "C-L"
BASIN, USE  CATCH BASIN GRATE-TYPE ADA AS
MANUFACTURED BY UNITED CONCRETE PRODUCTS,
INC, OR EQUIVALENT.
(NOT TO SCALE)
RIP RAP PAD DETAIL
A
SECTION A-A
PLAN VIEW
A
0%
12"
WIDTH
LENGTH
H
THIS TRENCH SECTION TO BE USED
FOR SOLID PVC AND CPEP-S STORM
SEWER PIPING WHERE THE DIMENSION
D IS LESS THAN 48".
12" (MIN.)
PRESHAPE BEDDING
MATERIAL TO 0.10H
PRIOR TO INSTALLING
PIPE.
0.25H
(NOT TO SCALE)
STORM SEWER TRENCH DETAIL
4" IN EARTH AND
12" (MIN.) IN ROCK
D=DIA.
CIRCULAR PIPE   &
PIPE ARCH OF
EQUIVALENT
HORIZONTAL
(NOT TO SCALE)
CURLEX ® SEDIMENT LOG STAKE DETAIL (ON BARE SOIL)
DOWN SLOPE
NOTES:
1. CURLEX SEDIMENT LOGS AS MANUFACTURED BY AMERICAN
EXCELSIOR COMPANY.  SEDIMENT LOG SIZE TO BE 9-INCHES
UNLESS OTHERWISE NOTED ON THE PLANS.
2. TRENCH OPTION IS MOST APPLICABLE IN LOOSE,
UNCONSOLIDATED SOILS.
3. STAKE SIZE:
1 1 8" X 1 1 8" X 30" WOODEN STAKES ARE RECOMMENDED FOR
6", 9", AND 12" SEDIMENT LOGS.
1 1 8" X 1 1 8" X 48" WOODEN STAKES ARE RECOMMENDED FOR
20" SEDIMENT LOGS.
4. INSTALLATION TO BE AS PER THE MANUFACTURERS
INSTRUCTIONS.
16"
(MIN.)
2:1
2:1
(NOT TO SCALE)
GRASS LINED CHANNEL DETAIL - MOWING NOT REQUIRED
WIDTH AS NOTED
DEPTH AS NOTED
(6" MIN.)
NOTES:
1. PREPARATION OF CHANNEL AREA TO COMPLY WITH SECTION 9.50 OF CONNDOT FORM 819
AS AMENDED.
2. SEED MIXTURE TO BE:
CREEPING RED FESCUE (PENNLAWN, WINTERGREEN) 2.1 LBS/1,000 SQ.FT.
REDTOP (STREEKER, COMMON) 0.2 LBS/1,000 SQ.FT.
CROWN VETCH (CHEMUNG, PENNGIFT) WITH INNOCULANT 1.7 LBS/1,000 SQ.FT.
(OR FLATPEA (LATHCO) WITH INNOCULANT) (3.5 LBS/1,000 SQ.FT.)
3. CHANNEL TO BE LINED WITH AN EROSION CONTROL MATTING (ECM) CONFORMING TO FORM
819 AND APPROVED BY CONNDOT FOR CLASS 2 E or F: FLEXIBLE CHANNEL LINER
PROTECTION TEMPORARY - (AMERICAN EXCELSIOR COMPANY - CURLEX II OR EQUIVALENT)
4. INSTALL AS PER THE MANUFACTURERS INSTRUCTIONS.
GENERAL EROSION AND SEDIMENT CONTROL NOTES:
1. EROSION AND SEDIMENT CONTROL MEASURES SHALL CONFORM TO, " CONNECTICUT GUIDELINES FOR SOIL EROSION AND
SEDIMENT CONTROL, THE CONNECTICUT COUNCIL ON SOIL AND WATER CONSERVATION, MARCH 30, 2024" AS AMENDED.
2. THE SEDIMENT AND EROSION CONTROL NOTES AND DETAILS INCLUDED IN THE CONSTRUCTION DOCUMENTS MAY REFER TO
INFORMATION LOCATED IN THE GUIDELINES.  THE CONTRACTOR SHALL HAVE A COPY OF THE GUIDELINES AVAILABLE FOR
REFERENCE DURING CONSTRUCTION.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION, MAINTENANCE, AND REMOVAL OF ALL SEDIMENTATION AND
EROSION CONTROL MEASURES.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING THE NEARBY STREETS OF ANY SEDIMENT OR CONSTRUCTION
DEBRIS ORIGINATING FROM THIS PROJECT.
5. IF EXCESS MATERIAL FROM THE PROPOSED CONSTRUCTION IS TO BE REMOVED FROM THE SITE, THE CONTRACTOR SHALL
OBTAIN ALL NECESSARY PERMITS FOR  ITS DEPOSITION.
6. THE CONSTRUCTION ENTRANCE, IF NOTED,  AND THE SEDIMENT CONTROLS LOCATED AT THE PERIMETER OF THE PROPOSED
EDGE OF DISTURBANCE(S), SHALL BE INSTALLED PRIOR TO ANY CONSTRUCTION ACTIVITY.  INSTALLATION SHALL BE AS PER THE
MANUFACTURERS' INSTRUCTIONS AND AS DETAILED ON THESE PLANS.
7. ALL STORM DRAINAGE INLETS ARE TO BE PROTECTED FROM SEDIMENT INTRUSION.  SEDIMENT SHALL BE REMOVED FROM ALL
DRAINAGE  STRUCTURES, PIPE SYSTEMS, OUTLET STRUCTURES, RIP RAP, AND CHANNELS.
8. ALL STOCKPILES OF SOIL ARE TO BE ENCIRCLED WITH SILT FENCE.
9. THE CONTRACTOR SHALL EMPLOY TEMPORARY EROSION CONTROL MEASURES SUCH AS, SILT FENCE, SEDIMENT LOGS, STONE
BARRIERS, EROSION CONTROL MATTING, SEDIMENT TRAPS, DEWATERING BASINS, AND TEMPORARY STORMWATER DIVERSIONS,
AS NECESSARY DURING CONSTRUCTION, TO PROTECT THE SITE AND ADJACENT PROPERTIES FROM EROSION.
10. ALL LOCATIONS, INCLUDING SWALES, LAWN AREAS, AND STORM SEWER DISCHARGE POINTS, THAT ARE TO RECEIVE A
CONCENTRATED FLOW OF STORMWATER, ORIGINATING FROM SURFACE FLOW OR STORM SEWER SYSTEMS, SHALL BE
STABILIZED AND PROTECTED FROM EROSION PRIOR TO RECEIVING THE WATER.  ECM CHANNEL TO BE INSTALL PRIOR TO
CONNECTING THE PROPOSED PIPE TO THE NEW CATCH BASIN.
11. DAMAGED  SECTIONS OF SILT FENCE AND/OR HAY BALES SHALL BE REPLACED BY THE CONTRACTOR.  SEDIMENT DEPOSITS
SHALL BE REMOVED BY THE CONTRACTOR WHEN THEY REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIER.
SEDIMENT SHALL BE REMOVED IN A MANNER THAT DOES NOT CAUSE ADDITIONAL EROSION OR POLLUTION.
12. AT A MINIMUM, ALL SEDIMENT CONTROL MEASURES SHALL BE INSPECTED BY THE CONTRACTOR AT LEAST ONCE A WEEK AND
WITHIN 24 HOURS OF THE END OF A STORM WITH A RAINFALL AMOUNT OF 0.5 INCHES OR GREATER.   REPAIR SEDIMENT
CONTROL MEASURE AS NECESSARY.
13. DISTURBED AREAS ARE TO BE STABILIZED AS SOON AS POSSIBLE AFTER DISTURBANCE.  WHEN GRADING OF THE DISTURBED
AREA WILL BE SUSPENDED FOR A PERIOD OF 30 OR MORE CONSECUTIVE DAYS, BUT LESS THAN 5 MONTHS, STABILIZE THE SITE
WITHIN 7 DAYS OF THE SUSPENSION OF GRADING THROUGH THE USE OF MULCH OR OTHER MATERIALS APPROPRIATE FOR USE
AS A TEMPORARY SOIL PROTECTOR.  FOR SURFACES THAT ARE NOT TO BE REWORKED WITHIN 5 MONTHS BUT WILL BE
REWORKED WITHIN 1 YEAR, USE TEMPORARY SEEDING, MULCH FOR SEED OR WHEN SLOPES ARE LESS THAN 3:1, WOOD CHIPS,
BARK CHIPS OR SHREDDED BARK.  FOR SURFACES THAT ARE TO BE REWORKED AFTER 1 YEAR, USE PERMANENT SEEDING AND
MULCH FOR SEED.
14. EXCAVATED STUMPS AND CUT TREES ARE TO BE CHIPPED AND STOCKPILED FOR FUTURE USE, OR REMOVED TO AN OFF-SITE
DISPOSAL AREA.   BRUSH AND SLASH ARE TO BE CHIPPED AND STOCKPILE FOR FUTURE USE OR REMOVED FROM THE SITE.
EXCAVATED STUMPS, CUT TREES, BRUSH, AND SLASH, ARE NOT TO BE BURIED ON-SITE.
THE CONTRACTOR SHALL USE "CALL BEFORE YOU DIG, 1-800-922-4455" PRIOR TO ANY CONSTRUCTION ACTIVITY.
2. CONSTRUCTION METHODS AND MATERIALS, SHALL CONFORM TO THE REGULATIONS OF  CONNDOT FORM 819 AS AMENDED.
3. THE CONTRACTOR SHALL VERIFY ALL LINES AND GRADES PRIOR TO ANY CONSTRUCTION. ANY DISCREPANCIES SHALL BE
BROUGHT TO THE ATTENTION OF THE ENGINEER.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND INCURRING THE COST OF ALL REQUIRED PERMITS,
INSPECTIONS, CERTIFICATES, ETC.
5. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR JOBSITE SAFETY AND SHALL COMPLY WITH ALL FEDERAL AND STATE
OCCUPATIONAL SAFETY AND HEALTH AUTHORITY (O.S.H.A.) REGULATIONS.
6. THE CONTRACTOR SHALL PROVIDE, INSTALL, MAINTAIN AND REMOVE ALL SHORING, BRACING AND OTHER ITEMS NECESSARY
TO RETAIN BANKS OR EXCAVATIONS AND PREVENT CAVE-INS AND DISPLACEMENT OF ADJOINING GROUND.  SHORING AND
BRACING SHALL BE ENTIRELY INDEPENDENT OF FOOTINGS.
7. THE CONTRACTOR SHALL KEEP TRENCHES FREE FROM STANDING WATER AT ALL TIMES UNTIL PERMANENT WORK IS IN
PLACE.  ALL NECESSARY WELL-POINTING AND/OR PUMPING SHALL BE PERFORMED AND MAINTAINED AT THE CONTRACTOR'S
EXPENSE.
6. ALL EXPOSED CURB ENDS ARE TO BE TAPERED.
7. SAW CUT EXISTING CURBS AND PAVEMENT WHERE THEY MEET PROPOSED CURBS OR PAVEMENT.
PROJECT NARRATIVE:
THE PROPOSED PROJECT  CONSISTS OF THE REPAVING OF A TOWN ROAD BY THE DEPARTMENT OF PUBLIC WORKS. AS PART OF THE PROJECT,
A NEW CATCH BASIN AND OUTLET PIPE WILL BE INSTALLED.  THE DISCHARGE FROM THE PIPE WILL NE DIRECTED TO KENDELL BROOK.  THE
ACTIVITIES WILL TAKE PLACE IN THE UPLAND REVIEW AREA.  NO ACTIVITIES ARE PROPOSED WITHIN WETLANDS OR WATERCOURSES.  THE
TOTAL AREA WITHIN THE REGULATED AREA WILL BE APPROXIMATELY 3080 S.F.   INCLUDED IN THE WORK WITHIN THE REGULATED AREA ARE:
· 110 LF OF 15-INCH PIPE
· 1 FLARED PIPE END
· 25 SF OF RIP RAP
· 325 SF OF ECM (EROSION CONTROL MATTING)
· LAND GRADING OVER THE PIPE
· ASSOCIATED SEDIMENT AND EROSION CONTROL BMP'S
THE SITE IS AN EXISTING DEVELOPED RESIDENTIAL SUBDIVISION.  WETLAND SOILS ARE LOCATED ADJACENT TO KENDELL BROOK.   ALL
DISTURBANCES ARE TEMPORARY AND THE WORK WILL BE PERFORMED BY THE TOWN OF GRANBY DEPARTMENT OF PUBLIC WORKS.  THE
WORK WILL OCCUR THIS SUMMER.  TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES WILL BE IMPLEMENTED DURING
CONSTRUCTION. .
THE RESPONSIBLE PARTY IS:
KIRK SEVERANCE
DIRECTOR-DEPARTMENT OF PUBLIC WORKS.
52 NORTH GRANBY ROAD
GRANBY, CT 06035
PHONE: (860) 653-8960
EXISTING INFORMATION TAKEN FROM A PLAN ENTITLED, "TOPOGRAPHIC SURVEY PLAN, PREPARED FOR: TOWN OF GRANBY, #9-#14
EVANGELINE PLACE, GRANBY, CONNECTICUT, SCALE: 1"=20', JUNE 19, 2026, BSC GROUP."
OVERALL CONSTRUCTION  SEQUENCE:
1. FLAG THE LIMITS OF CONSTRUCTION AND TREE CLEARING.
2. INSTALL PERIMETER EROSION AND SEDIMENT CONTROLS.
3. SITE MEETING WITH TOWN STAFF.
4. CUT TREES AND BRUSH WITHIN THE CLEARING LIMITS AND REMOVE CUT WOOD.  REMOVE AND DISPOSE OF STUMPS.
5. STRIP AND STOCKPILE THE EXISTING TOPSOIL AND OTHER SURPLUS MATERIAL.  STABILIZE THE STOCKPILE(S).
COORDINATE WITH THE ADJACENT HOMEOWNERS REGARDING STOCKPILE PLACEMENT.
6. INSTALL DRAINAGE FROM DOWNSTREAM END BEGINNING WITH THE CHANNEL AND SEDIMENT LOGS.
7. INSTALL PIPE AND CB #1.   PROTECT CATCH BASINS WITH SEDIMENT LOGS.
8. STABILIZE DISTURBED AREA DRAINING TOWARD THE PIPE OUTLET.
9. INSTALL PIPE AND CB #2.
10. RECLAIM  AND RESHAPE ROAD AREA.
11. INSTALL NEW PAVEMENT AND CURBS.
12. GRADE SHOULDER AREAS.  SEED AND STABILIZE SHOULDERS AS NECESSARY.
13. INSTALL PAVEMENT SURFACE COURSE.
14. MAINTAIN EROSION AND SEDIMENT CONTROLS UNTIL SITE IS STABILIZED.
15. REMOVE ANY REMAINING EROSION CONTROLS UNLESS DIRECTED OTHERWISE.
(NOT TO SCALE)
BITUMINOUS CONCRETE LIP CURB (B.C.L.C.) DETAIL
1"
48° 21°
9"
12"
6"
GRANBY TOWN HALL
15 NORTH GRANBY ROAD
GRANBY, CONNECTICUT 06035
PHONE: (860) 844-5318     FAX:  (860) 844-5325
TOWN OF GRANBY
ENGINEERING DEPARTMENT
SCALE: DATE: JOB #: SHEET:
NONE JULY 16, 2026 2026.G03 2  OF 2
TOWN OF GRANBY
PLAN SHOWING PROPOSED STORM DRAINAGE
EVANGELINE PLACE
GRANBY, CONNECTICUT
NO. DATE DESCRIPTION
REVISIONS

Minutes: archived copy, SHA-256 9742f56b751a…. Agenda: archived copy, SHA-256 84d911f28d4b…. Packet: kept offline, SHA-256 44fa9c4a7769….