CT Public Docs Tracker

Towns / Granby / Inland Wetlands & Watercourses Commission / Jul 8, 2026

Inland Wetlands & Watercourses Commission, Jul 8, 2026

Granby minutes posted

Documents

TypeDocumentPagesOpen
minutes IWWC Minutes 6 PDF download · town site
agenda IWWC Agenda 2 PDF download · town site
packet IWWC Meeting Packet
Not attached: this packet is 86 MB, too large to host here. Use the town site link.
374 town site

Summary of the minutes

AI-generated summary. Each line links to the PDF page it came from; check it before relying on it.

Read the official minutes (PDF, 6 pages) The PDF is the record; this summary is a guide to it.

At its July 8, 2026 meeting, the Granby Inland Wetlands and Watercourses Commission approved the June 10, 2026 minutes and approved permits for 94 Quarry Road and 86 Case Street, with conditions for the latter. It continued several applications and hearings, delegated the 63 Harmony Hill Road subdivision to the Agent, and upheld the Enforcement Order for 7 Laurel Drive.

Decisions (11) · all reported votes

  1. Approval of June 10, 2026 Meeting Minutes
    Approved as presented
    Vote: Motion by F. Jones, second by D. Tolli, carried 5-0-1 (J. Laudati abstained) · p. 1
  2. 94 Quarry Road – J. Fort – Permit to place a 12' x 28' prefabricated garage on crushed stone within a regulated area
    Approved application and draft approval letter as presented
    Vote: Motion by S. Okie, second by B. Schmitt, carried 6-0-0 · p. 1
  3. 86 Case Street – J. Vosburgh – Permit to construct a single-family home with site improvements within a regulated area
    Approved application and draft approval letter as amended, with conditions: (1) Mylar copy of approved plans filed on Land Records prior to building permit; (2) Mylar copy of final As-Built Drawing filed prior to Certificate of Occupancy; (3) wetland delineation shown as 'General Limits', and any additional proposed activities require a new wetland delineation
    Vote: Motion by B. Schmitt, second by F. Jones, carried 5-0-0 · p. 1, p. 2
  4. 5 Godard Road – H. Werner and S. Werner – Permit to construct a single-family home and detached garage within a regulated area
    Received and continued to the next regular meeting; Agent K. Bednaz to conduct a site visit and requested better-defined limits of clearing and consideration of shifting the house location
    Vote: Motion by D. Tolli, second by S. Okie, carried 6-0-0 · p. 2
  5. 63 Harmony Hill Road – Roswell Development, LLC – Permit for 8-lot single-family residential subdivision within a regulated area
    Delegated to the IWWC Agent for review and approval
    Vote: Motion by B. Schmitt, second by N. Dethlefsen, carried 5-0-0 · p. 3
  6. 215 Salmon Brook Street – Town of Granby – Permit to construct a 24' x 12' gazebo on a concrete pad and install eight benches within a regulated area
    Received and continued to the next regular meeting
    Vote: Motion by S. Okie, second by F. Jones, carried 6-0-0 · p. 3
  7. 199 Broad Hill Road – T. Kurnicki – Public hearing on permit to construct a single-family home within a regulated area
    Public hearing continued to the next regular meeting; Agent recommended applicant provide a Landscaping Plan, modified construction sequence, enhanced E&S controls, seed mixes for steep slopes, and an invasive species management plan
    Vote: Motion by B. Schmitt, second by S. Okie, carried 6-0-0 · p. 3, p. 4
  8. 37 Hartford Avenue – F. Devine – Public hearing on permit for a 16-unit apartment building within regulated areas 10,145 square feet 4,642 square feet
    Public hearing continued to the next regular meeting at applicant's request so revised plans can address staff comments
    Vote: Motion by N. Dethlefsen, second by F. Jones, carried 6-0-0 · p. 4
  9. 7 Laurel Drive – C. Fontaine and R. Weiner – Show Cause Hearing on regulated activity without a valid IWWC Permit
    Enforcement Order upheld and item continued to the next regular meeting
    Vote: Motion by F. Jones, second by D. Tolli, carried 5-0-0 · p. 5
  10. 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Update on regulated activity without a valid IWWC Permit
    Agenda item continued to the next regular meeting
    Vote: Motion by J. Laudati, second by B. Schmitt, carried 5-0-0 · p. 5
  11. Adjournment
    Meeting adjourned at 9:55 p.m.
    Vote: Motion by N. Dethlefsen, second by J. Laudati, carried 6-0-0 · p. 6

Also discussed (3)

  • 138 Day Street – Reinhard Maier c/o The Reinhard W. Maier Living Trust – Rear addition within a regulated area: Reported as Authorized Agent approval on 6/15/26 (no Commission vote) · p. 5
  • 65 Cider Mill Heights – C. Jensen – 12' x 16' prefabricated shed on crushed stone base within a regulated area: Reported as Authorized Agent approval on 6/24/26 (no Commission vote) · p. 5
  • 65, 79 and 87 Barkhamsted Road – C. McGee – Regulated activity without a valid IWWC Permit: Notice of Violation issued 5/28/26; property owner to work with staff to address the matter; updates to be provided as necessary · p. 6
Summary of the agenda: IWWC Agenda

AI-generated summary.

This is the July 8, 2026 agenda for the Granby Inland Wetlands and Watercourses Commission, listing permit requests, public hearings, a show cause hearing, and agent reports.

On the agenda (13)

  1. Action on the June 10, 2026, Meeting Minutes · p. 1
  2. 94 Quarry Road – J. Fort – Permit request to place a 12' x 28' prefabricated garage on crushed stone within a regulated area (continued from 6/10/26) · p. 1
  3. 86 Case Street – J. Vosburgh – Permit request to construct a single-family home with associated site improvements within a regulated area (continued from 6/10/26) · p. 1
  4. 5 Godard Road – H. Werner and S. Werner – Permit request to construct a single-family home and detached garage with associated site improvements within a regulated area (to be received) · p. 1
  5. 63 Harmony Hill Road – Roswell Development, LLC. – Permit request for an 8-lot single family residential subdivision and associated site work within a regulated area (to be received) · p. 1
  6. 215 Salmon Brook Street – Town of Granby – Permit request to construct a gazebo on a concrete pad within a regulated area (to be received) · p. 1
  7. 199 Broad Hill Road – T. Kurnicki – Public hearing on permit request to construct a single-family home with associated site improvements within a regulated area (to open) · p. 1
  8. 37 Hartford Avenue – F. Devine – Public hearing on permit application for regulated activities for development of a 16-unit apartment building and associated site improvements (to open) · p. 1
  9. 7 Laurel Drive – C. Fontaine and R. Weiner – Show cause hearing for conducting a regulated activity without a valid IWWC Permit · p. 1
  10. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Agent report on conducting a regulated activity without a valid IWWC Permit · p. 1
  11. 138 Day Street – Reinhard Maier c/o The Reinhard W. Maier Living Trust – Permit request to construct an 11.5' x 26' single-story rear addition within a regulated area; Authorized Agent approval 6/15/26: (agent report) · p. 1
  12. 65 Cider Mill Heights – C. Jensen – Permit request to place a 12'x16' prefabricated shed on a 14'x18' crushed stone base with future underground electrical conduit within a regulated area; Authorized Agent approval 6/24/26: (agent report) · p. 1
  13. 65, 79 and 87 Barkhamsted Road – C. McGee – Conducting a regulated activity without a valid IWWC Permit · p. 2

This PDF is a scan; its text was read by OCR and may contain errors.

Full text of the documents

View the minutes PDF on this page (IWWC Minutes) Open the PDF
Text of the minutes (IWWC Minutes, 6 pages)

Page 1 · open in PDF

 
1 
MEETING MINUTES 
Town of Granby 
Inland Wetlands and Watercourses Commission 
Wednesday, July 8, 2026, at 7:00 pm 
 
PRESENT: Nick Dethlefsen, Barbara Schmitt, David Tolli, Susan Okie, John Laudati, and Fred 
Jones 
ALSO PRESENT: IWWC Agent Kate Bednaz and Land Use Coordinator Renee Deltenre 
 
1. Call to Order 
Chair J. Laudati called the meeting to order at 7:01 p.m. 
 
2. Action on the June 10, 2026, Meeting Minutes 
 
ON A MOTION by F. Jones seconded by D. Tolli, the Commission voted 5-0-1 to approve 
the June 10, 2026, minutes as presented. J. Laudati abstained. 
 
3. Permit Requests 
a. 94 Quarry Road – J. Fort – Permit request to place a 12’ x 28’ prefabricated garage 
on crushed stone within a regulated area.  
This application was received and continued from last month’s meeting. The property 
owner is seeking permission to place a 12’x28’ prefabricated garage on a 14’x30’ 
crushed stone base with underground electrical within an existing lawn area. The permit 
request also includes the removal of an existing shed, and the application has been 
updated to accommodate staff comments. A draft approval letter was provided to the 
Commission for review and consideration. 
 
ON A MOTION by S. Okie seconded by B. Schmitt, the Commission voted 6-0-0 to 
approve the application and draft approval letter as presented.  
 
J. Laudati recused himself at 7:05 p.m. 
 
b. 86 Case Street – J. Vosburgh – Permit request to construct a single-family home 
with associated site improvements within a regulated area.  
This application was received and continued from last month’s meeting. Applicant 
Jonathan Vosburgh was present to discuss the application and revisions that were made 
based on a site inspection conducted by Soil Scientist Ian Cole and Granby’s Wetlands 
Agent Kate Bednaz. Due to staff concerns regarding hydrology and the wetland 
delineation due to the placement of fill overtime, both staff and the applicant’s Soil 
Scientist found common ground with a revised wetland delineation. The orientation of 
the home has shifted slightly to the west, and a front walkway was added. The 
Commission discussed whether or not a full wetlands delineation should be required, and 
if not, outlined additional conditions of approval. 
 

Page 2 · open in PDF

 
2 
ON A MOTION by B. Schmitt seconded by F. Jones, the Commission voted 5-0-0 to 
approve the application and draft approval letter as amended to include the following 
conditions: 
1. A Mylar copy of the approved plans shall be filed on the Land Records in the 
Office of the Town Clerk, prior to the issuance of a building permit.  
2. A Mylar copy of the final As-Built Drawing shall be filed on the Land Records in 
the Office of the Town Clerk, prior to the issuance of a Certificate of Occupancy. 
3. The wetland’s delineation as shown are “General Limits”, and any additional 
proposed activities will require the submittal of a new wetland delineation.  
 
J. Laudati was reseated at 7:37 p.m. 
 
c. 5 Godard Road – H. Werner and S. Werner – Permit request to construct a single-
family home and detached garage with associated site improvements within a 
regulated area. 
Property owners Harry and Susan Werner, as well as Professional Engineer Guy Hesketh 
were present to discuss the application. The owners are seeking permission to construct a 
3-bedroom single-story home with a detached garage, gravel driveway, paver walkway, 
front porch, rear deck and rear patio within a regulated area. Soil Scientist William 
Jackson conducted a wetlands delineation, and his report has been submitted as part of 
the application. There is an existing farm pond on the property, along with a narrow 
watercourse that flows towards the north as part of the East Branch of the Salmon Brook. 
All proposed activities are located within the 200-foot upland review area of the pond and 
80% within the 100-foot upland review area of the wetlands. G. Hesketh provided a 
thorough overview of the plans, including erosion and sedimentation control measures, 
site grading and drainage, septic design, etc.  
 
Perk testing has been conducted, and the proposed septic system will be located within 
the northeast corner of the site. Questions were raised regarding tree clearing limits and 
whether or not the house could be shifted to the west, farther away from the wetland’s 
boundary. At this time, the closest area of disturbance is approximately ten feet from the 
closest wetlands boundary; Wetlands Flag #A-16. S. Werner informed the Commission 
of their intent to establish a Conservation Easement over a large portion of the property, 
similar to their abutting properties to preserve land in its natural state. K. Bednaz will 
conduct a site visit and requested that the limits of clearing be better defined on the Site 
Plan and consideration be given to shifting the location of the house.  
 
ON A MOTION by D. Tolli seconded by S. Okie, the Commission voted 6-0-0 to 
receive and continue the application to the next regular meeting. 
 
J. Laudati recused himself at 8:15 p.m. 
 
d. 63 Harmony Hill Road – Roswell Development, LLC. – Permit request for an 8-lot 
single family residential subdivision and associated site work within a regulated 
area.  

Page 3 · open in PDF

 
3 
Applicant Jonathan Vosburgh of Roswell Development, LLC was present to discuss the 
application. He is seeking permission to create eight additional lots as part of a re-
subdivision of an existing 6.45-acre parcel known as 63 Harmony Hill Road. Plans have 
been submitted to the Farmington Valley Heath District for review, and the applicant 
presents to the Planning and Zoning Commission next week. Soil Scientist Ian Cole 
conducted a wetlands delineation, and his report has been submitted as part of the 
application. Based on his findings, there are no wetlands or watercourses on the subject 
site, and there are no alluvial soils within 100’ of the property line. The brook located on 
the adjacent parcel known as 290 North Granby Road has clearly defined alluvial soils 
and is located more than 200 feet from the proposed activities.   
 
ON A MOTION by B. Schmitt seconded by N. Dethlefsen, the Commission voted 5-0-0 
to delegate the application to the IWWC Agent for review and approval. 
 
J. Laudati was reseated at 8:29 p.m. 
 
e. 215 Salmon Brook Street – Town of Granby – Permit request to construct a gazebo 
on a concrete pad within a regulated area.  
The Town of Granby is seeking permission to construct a 24’ x 12’ gazebo on a concrete 
pad just southeast of the dog park, parking lot located within the existing lawn area. The 
application also includes the installation of eight benches throughout the park along the 
walking trail. The benches will be anchored to an 8’ x 12’ concrete pad, allowing 
additional space for a wheelchair. Six inches of soil will be excavated, crushed stone will 
be added and compacted, and then the concrete pad will be poured.  
 
ON A MOTION by S. Okie seconded by F. Jones, the Commission voted 6-0-0 to 
receive and continue the application to the next regular meeting. 
 
4. Public Hearings 
a. 199 Broad Hill Road – T. Kurnicki – Permit request to construct a single-family 
home with associated site improvements within a regulated area.  
Applicant and property owner Thomas Kurnicki was present to discuss the application, 
which was received and discussed on May 13, 2026, and scheduled for a public hearing 
this evening. He is seeking permission to construct a single-family home so that he and 
his family can relocate from California. The 3.04-acre site consists of a challenging 
terrain with an intermittent watercourse, wetlands soils, a storm drainage ROW in favor 
of the Town of Granby and is located within the Salmon Brook upland review area. After 
discussion by the Commission at the May meeting, it was determined that a wetland 
delineation was required and the applicant has provided revised drawings, as well as a 
wetland/watercourse delineation report.  
 
A memorandum from Professional Engineer TJ Barresi was provided to the Commission, 
outlining responses to staff comments and concerns. T. Kurnicki ran through the 
revisions and noted that he is still waiting on approval from the Farmington Valley 
Health District. Concerns were raised regarding the limits of clearing, proposed grading 
and lack of a Landscaping Plan. TJ Barresi joined via Zoom to explain the design of the 

Page 4 · open in PDF

 
4 
driveway and the grading necessary to meet the standards required as part of the 
Subdivision Regulations. A stone swale is proposed along the driveway to collect water 
as it runs down the hill, and the final proposed grades will have less slope than existing 
conditions. K. Bednaz recommended that the hearing remain open and requested that the 
applicant provide a Landscaping Plan, modify the construction sequence, enhance E&S 
control measures, utilize seed mixes for steep slopes, and prepare an invasive species 
management plan. There was no public comment.  
 
ON A MOTION by B. Schmitt seconded by S. Okie, the Commission voted 6-0-0 to 
continue the public hearing to the next regular meeting. 
 
b. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in 
connection with the development of a 16-unit apartment building and associated site 
improvements.  
Professional Engineer Rebecca Li was present to discuss the application, which was 
received and discussed on June 10, 2026, and scheduled for a public hearing this evening. 
The applicant is seeking to construct a 16-unit apartment complex on the existing 
foundation, which will consist of five 1-bedroom units and twelve 2-bedroom units. The 
subject property is approximately 111,198 square feet and located within the 100-foot 
wetland upland review area and 200-foot watercourse upland review area (Salmon Brook 
tributary). Site improvements include, but are not limited to, parking, utilities, stormwater 
management, site grading, landscaping, lighting, pavilion and dumpster enclosure. 
Proposed disturbance within the 200-foot upland review area is 10,145 square feet and 
proposed disturbance within the 100-foot upland review area is 4,642 square feet.  
 
R. Li provided an overview of the plans, including erosion and sedimentation control 
measures, site grading and drainage, septic design, etc. Perk testing has been conducted, 
and the proposed GST septic system will be located in front of the building, parallel to 
Hartford Avenue. Plans have been submitted to the Farmington Valley Health District 
and State of CT Department of Health for review. In response to Commissioner 
comments, a nitrogen dilution evaluation and sewer extension feasibility analysis were 
provided. An invasive species management plan will be provided, and additional 
plantings will be added at the top of the slope. R. Li requested that the hearing remain 
open so that revised plans may be presented to address staff comments at the next 
meeting.  
 
Public Comment 
Reinhard Maier, 138 Day Street, expressed concern and referenced the prior application 
from Vessel RE Holdings, LLC.   
 
Robert Flanigan, 24 Woodcliff Drive, expressed concerns regarding the potential impact 
of the development on the adjacent wetlands and watercourse.  
 
Attorney George Schober, Enfield, CT, spoke on behalf of his client Peter Voskowsky, 
who is an abutting property owner. His client is concerned with the potential for effluent 
to seep onto his property and requests a third-party independent review of the application.  

Page 5 · open in PDF

 
5 
ON A MOTION by N. Dethlefsen seconded by F. Jones, the Commission voted 6-0-0 to 
continue the public hearing to the next regular meeting. 
 
J. Laudati recused himself at 9:25 p.m. 
 
5. Show Cause Hearing 
a. 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a Regulated Activity 
without a valid IWWC Permit.  
K. Bednaz stated that an Enforcement Order was issued on 7/2/26 to the owners of 7 
Laurel Drive, for the placement of a prefabricated shed, split rail fencing and 
underground drainage piping within a regulated area without a permit. Owners Colleen 
Fontaine and Ross Weiner were present to discuss the situation and noted that they have 
retained Attorney Kari Olson to assist with this matter and are engaging with a Soil 
Scientist. K. Bednaz conducted a site visit on 6/5/26 and provided background 
information on the property, including the prior Enforcement Order. At this time, erosion 
and sedimentation control measures have been installed at the request of staff and the 
property owners plan to have an application submitted in advance of the August meeting. 
 
ON A MOTION by F. Jones seconded by D. Tolli, the Commission voted 5-0-0 to 
uphold the Enforcement Order and continue to the next regular meeting. 
 
6. Agent Report and Correspondence 
a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – 
Conducting a Regulated Activity without a valid IWWC Permit. 
Attorney Timothy Furey was present on behalf of the property owner to provide updates. 
At this time, mapping has been completed by Robert Green Associates, LLC and Soil 
Scientist David Lord has flagged the property. The property owner has been working 
with the USDA on his proposed farming activities, and Attorney Furey anticipates that 
documentation will be provided within the next month. At the last meeting, the 
Commission made a motion requiring the submittal of the existing conditions plan for the 
entire site by the next meeting; however, this was not provided.  
 
ON A MOTION by J. Laudati seconded by B. Schmitt, the Commission voted 5-0-0 to 
continue this agenda item to the next regular meeting. 
 
J. Laudati was reseated at 9:44 p.m. 
 
b. 138 Day Street – Reinhard Maier c/o The Reinhard W. Maier Living Trust – Permit 
request to construct a 11.5’ x 26’ single-story rear addition within a regulated area. 
Authorized Agent approval 6/15/26. 
 
c. 65 Cider Mill Heights – C. Jensen – Permit request to place a 12’x16’ prefabricated 
shed on a 14’x18’ crushed stone base with future underground electrical conduit 
within a regulated area. Authorized Agent approval 6/24/26. 
 

Page 6 · open in PDF

 
6 
d. 65, 79 and 87 Barkhamsted Road – C. McGee – Conducting a Regulated Activity 
without a valid IWWC Permit.  
A Notice of Violation was issued on 5/28/26 to the owner of 65, 79 and 87 Barkhamsted 
Road for the stockpiling of vehicles and various materials within the upland review area 
of the West Branch of Salmon Brook. K. Bednaz spoke with the property owner this 
afternoon regarding his property and regulated activities. Mr. McGee will be working 
with staff to address the matter, and updates will be provided as necessary. 
 
K. Bednaz also informed the Commission that the owners of the Station 280 Apartment Complex 
will install the excess scheduled plantings to the area where trash debris has been an issue.  
 
7. Commissioner Reports and Correspondence 
None 
 
8. Other Correspondence 
The Commission received email correspondence from Maureen Eberly in their meeting 
packet regarding weather patterns in Connecticut.  
 
9. Adjourn 
 
ON A MOTION by N. Dethlefsen seconded by J. Laudati, the Commission voted 6-0-0 to 
adjourn the meeting at 9:55 p.m. 
 
Respectfully submitted, 
 
 
 
Renee Deltenre 
Land Use Coordinator 
 
View the agenda PDF on this page (IWWC Agenda) Open the PDF
Text read from the scanned agenda (OCR) (IWWC Agenda, 2 pages)

Page 1 · open in PDF

Town of Granby
Inland Wetlands and Watercourses Commission
Regular Meeting Agenda
Wednesday, July 8, 2026, at 7:00 pm
Town Hall Meeting Room

Zoom: https://us02web.zoom.us/j/81245552872?pwd=UxQHF44PB4btTxzwa1zqYeF4is75Ua.1

Call In: 929-205-6099

Meeting ID: 812 4555 2872

Passcode: 486172

1. Call to Order

2. Action on the June 10, 2026, Meeting Minutes

3. Permit Requests

a. 94 Quarry Road – J. Fort – Permit request to place a 12' x 28' prefabricated garage on crushed stone within a regulated area. (Continued from 6/10/26)
b. 86 Case Street – J. Vosburgh – Permit request to construct a single-family home with associated site improvements within a regulated area. (Continued from 6/10/26)
c. 5 Godard Road – H. Werner and S. Werner – Permit request to construct a single-family home and detached garage with associated site improvements within a regulated area. (To be received)
d. 63 Harmony Hill Road – Roswell Development, LLC. – Permit request for an 8-lot single family residential subdivision and associated site work within a regulated area. (To be received)
e. 215 Salmon Brook Street – Town of Granby – Permit request to construct a gazebo on a concrete pad within a regulated area. (To be received)

4. Public Hearings

a. 199 Broad Hill Road – T. Kurnicki – Permit request to construct a single-family home with associated site improvements within a regulated area. (To Open)
b. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in connection with the development of a 16-unit apartment building and associated site improvements. (To Open)

5. Show Cause Hearing

a. 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a Regulated Activity without a valid IWWC Permit.

6. Agent Report and Correspondence

a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated Activity without a valid IWWC Permit.
b. 138 Day Street – Reinhard Maier c/o The Reinhard W. Maier Living Trust – Permit request to construct a 11.5' x 26' single-story rear addition within a regulated area. Authorized Agent approval 6/15/26.
c. 65 Cider Mill Heights – C. Jensen – Permit request to place a 12'x16' prefabricated shed on a 14'x18' crushed stone base with future underground electrical conduit within a regulated area. Authorized Agent approval 6/24/26.

Please note: Any person who wishes to provide materials for display on the video monitors at an IWWC meeting where such monitors are being used to videoconference the meetings must email the materials no later than 10 AM on the day of the meeting. All materials must be contained in a single attachment to the email. Materials received after the 10 AM deadline will not be accepted for display. Display of the materials is subject to all other rules and procedures of the IWWC. Zip drive, memory sticks and other data storage devices will not be accepted.

Page 2 · open in PDF

Town of Granby
Inland Wetlands and Watercourses Commission
Regular Meeting Agenda
Wednesday, July 8, 2026, at 7:00 pm
Town Hall Meeting Room

d. 65, 79 and 87 Barkhamsted Road – C. McGee – Conducting a Regulated Activity without a valid IWWC Permit.

7. Commissioner Reports and Correspondence

8. Other Correspondence

9. Adjourn

Please note: Any person who wishes to provide materials for display on the video monitors at an IWWC meeting where such monitors are being used to videoconference the meetings must email the materials no later than 10 AM on the day of the meeting. All materials must be contained in a single attachment to the email. Materials received after the 10 AM deadline will not be accepted for display. Display of the materials is subject to all other rules and procedures of the IWWC. Zip drive, memory sticks and other data storage devices will not be accepted.
Text of the packet (IWWC Meeting Packet, 374 pages)

Page 1

Town of Granby 
Inland Wetlands and Watercourses Commission 
Regular Meeting Agenda 
Wednesday, July 8, 2026, at 7:00 pm 
Town Hall Meeting Room 
 
Please note: Any person who wishes to provide materials for display on the video monitors at an IWWC meeting where such 
monitors are being used to videoconference the meetings must email the materials no later than 10 AM on the day of the meeting. 
All materials must be contained in a single attachment to the email.  Materials received after the 10 AM deadline will not be 
accepted for display. Display of the materials is subject to all other rules and procedures of the IWWC. Zip drive, memory sticks 
and other data storage devices will not be accepted. 
Zoom: https://us02web.zoom.us/j/81245552872?pwd=UxQHF44PB4btTxzwa1zqYeF4is75Ua.1 
Call In: 929-205-6099 
Meeting ID: 812 4555 2872 
Passcode: 486172 
 
1. Call to Order 
 
2. Action on the June 10, 2026, Meeting Minutes 
 
3. Permit Requests 
a. 94 Quarry Road – J. Fort – Permit request to place a 12’ x 28’ prefabricated garage on crushed stone 
within a regulated area. (Continued from 6/10/26)  
 
b. 86 Case Street – J. Vosburgh – Permit request to construct a single-family home with associated site 
improvements within a regulated area. (Continued from 6/10/26)  
 
c. 5 Godard Road – H. Werner and S. Werner – Permit request to construct a single-family home and 
detached garage with associated site improvements within a regulated area. (To be received) 
 
d. 63 Harmony Hill Road – Roswell Development, LLC. – Permit request for an 8-lot single family 
residential subdivision and associated site work within a regulated area. (To be received) 
 
e. 215 Salmon Brook Street – Town of Granby – Permit request to construct a gazebo on a concrete pad 
within a regulated area. (To be received) 
 
4. Public Hearings 
a. 199 Broad Hill Road – T. Kurnicki – Permit request to construct a single-family home with associated 
site improvements within a regulated area. (To Open)  
 
b. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in connection with the 
development of a 16-unit apartment building and associated site improvements. (To Open) 
 
5. Show Cause Hearing 
a. 7 Laurel Drive – C. Fontaine and R. Weiner – Conducting a Regulated Activity without a valid 
IWWC Permit.  
 
6. Agent Report and Correspondence 
a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated 
Activity without a valid IWWC Permit. 
 
b. 138 Day Street – Reinhard Maier c/o The Reinhard W. Maier Living Trust – Permit request to 
construct a 11.5’ x 26’ single-story rear addition within a regulated area. Authorized Agent approval 
6/15/26. 
 
c. 65 Cider Mill Heights – C. Jensen – Permit request to place a 12’x16’ prefabricated shed on a 14’x18’ 
crushed stone base with future underground electrical conduit within a regulated area. Authorized 
Agent approval 6/24/26. 
 

Page 2

Town of Granby 
Inland Wetlands and Watercourses Commission 
Regular Meeting Agenda 
Wednesday, July 8, 2026, at 7:00 pm 
Town Hall Meeting Room 
 
Please note: Any person who wishes to provide materials for display on the video monitors at an IWWC meeting where such 
monitors are being used to videoconference the meetings must email the materials no later than 10 AM on the day of the meeting. 
All materials must be contained in a single attachment to the email.  Materials received after the 10 AM deadline will not be 
accepted for display. Display of the materials is subject to all other rules and procedures of the IWWC. Zip drive, memory sticks 
and other data storage devices will not be accepted. 
d. 65, 79 and 87 Barkhamsted Road – C. McGee – Conducting a Regulated Activity without a valid 
IWWC Permit.  
 
7. Commissioner Reports and Correspondence 
 
8. Other Correspondence 
 
9. Adjourn 

Page 3

 
1 
MEETING MINUTES 
Town of Granby 
Inland Wetlands and Watercourses Commission 
Wednesday, June 10, 2026, at 7:00 pm 
 
PRESENT: Nick Dethlefsen, Barbara Schmitt, David Tolli, Susan Okie, Fred Jones, and Vickie Dirienzo 
ALSO PRESENT: IWWC Agent Kate Bednaz (Zoom) and Land Use Coordinator Renee Deltenre 
 
1. Call to Order 
Acting Chair S. Okie called the meeting to order at 7:00 p.m. 
 
2. Action on the May 13, 2026, Meeting Minutes 
 
ON A MOTION by V. Dirienzo seconded by F. Jones, the Commission voted 5-0-1 to approve 
the May 13, 2026, minutes as presented. D. Tolli abstained. 
 
3. Public Hearings 
a. 199 Broad Hill Road – T. Kurnicki – Permit request to construct a single-family home 
with associated site improvements within a regulated area. 
The opening of this hearing has been postponed to the next regular meeting on 7/8/26. 
 
4. Permit Requests 
a. 94 Quarry Road – J. Fort – Permit request to place a 12’ x 28’ prefabricated garage on 
crushed stone within a regulated area.  
Applicant and property owner James Fort was present to discuss the application. He is 
seeking permission to place a 12’x28’ prefabricated garage on a 14’x30’ crushed stone base 
with underground electrical within an existing lawn area. The permit request also includes the 
removal of an existing shed, and K. Bednaz met with the applicant on-site to discuss the 
project. Since the entire property is a mapped wetland, revisions were made to the application 
to increase erosion and sedimentation control measures and address some minor 
changes/recommendations. The application was received and continued to the next regular 
meeting.   
 
b. 37 Hartford Avenue – F. Devine – Permit application for regulated activities in 
connection with the development of a 16-unit apartment building and associated site 
improvements.  
Applicant Forrest Devine and Professional Engineer Rebecca Li were present to discuss the 
application. The applicant is seeking to construct a 16-unit apartment complex on the existing 
foundation, which will consist of four 1-bedroom units and twelve 2-bedroom units. The 
subject property is approximately 111,198 square feet and located within the 100-foot 
wetland upland review area and 200-foot watercourse upland review area (Salmon Brook 
tributary). Site improvements include, but are not limited to, parking, utilities, stormwater 
management, site grading, landscaping, and lighting. Proposed disturbance within the 200-
foot upland review area is 10,145 square feet and proposed disturbance within the 100-foot 
upland review area is 4,642 square feet. R. Li provided an overview of the plans, including 
erosion and sedimentation control measures, site grading and drainage, septic design, etc.  
 
Perk testing has been conducted, and the proposed GST septic system servicing 
approximately 3,700 GPD will be located in front of the building, parallel to Hartford 

Page 4

 
2 
Avenue. F. Devine provided background pertaining to the availability and potential of 
installing a sewer lateral, which is not a feasible alternative. The Commission discussed the 
proposed septic system, requested documentation pertaining to feasible and prudent 
alternatives, had recommendations to the planting plan, etc. 
 
ON A MOTION by V. Dirienzo seconded by D. Tolli, the Commission voted 6-0-0 to 
receive the application and schedule a public hearing for the next regular meeting on 7/8/26 
at 7:00 p.m. due to public interest and impact. 
 
c. 86 Case Street – J. Vosburgh – Permit request to construct a single-family home with 
associated site improvements within a regulated area. 
Applicant Jonathan Vosburgh and Professional Engineer Guy Hesketh were present to 
discuss the application. The applicant is seeking to construct a new single-family home, 
approximately 2,500 square feet in size with an attached garage, pool and patio. There is an 
existing man-made pond that was constructed over 30 years ago, and majority of the site is 
located within the 200-foot upland review area. Soil Scientist Ian Cole was hired to conduct a 
wetland delineation, and his report has been provided. G. Hesketh provided a thorough 
overview of the plans, including erosion and sedimentation control measures, site grading 
and drainage, septic design, etc. Perk testing has been conducted, and the proposed septic 
system will be located within the northeast corner of the site utilizing a pre-cast concrete 
pump station. J. Vosburgh provided a brief history of the site, explaining how the wetlands 
have changed over time and where fill was deposited during the creation of the farm pond. K. 
Bednaz expressed concerns with hydrology and the wetland delineation due to the placement 
of fill overtime and will meet Soil Scientist Ian Cole on site tomorrow to learn how the 
delineation was conducted. 
 
ON A MOTION by V. Dirienzo seconded by B. Schmitt, the Commission voted 6-0-0 to 
delegate the application to the IWWC Agent for review and approval, as long as the wetland 
delineation is found to be the same during a site inspection on 6/11/26 by the IWWC Agent.  
 
5. Agent Report and Correspondence 
a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a 
Regulated Activity without a valid IWWC Permit.  
Property owner Matt Reale was in attendance to provide an update. Soil Scientist David Lord 
has finalized the wetland delineation around/within the dam area; however, the design of the 
dam is not complete. No documentation has been provided to the Commission to date and K. 
Bednaz noted that civil action will be brought against the property owner if no progress is 
made. 
 
ON A MOTION by F. Jones seconded by V. Dirienzo, the Commission voted 6-0-0 to 
require the submittal of the existing conditions plan for the entire site to be submitted in 
advance of the next meeting.  
 
b. 9 Laurel Drive – V. Rich – RFR to install a ground-mount solar array within a 
regulated area (retroactive request). Nonregulated Use Determination 5-21-26. 
 
K. Bednaz informed the Commission of a recent violation at 7 Laurel Drive, which includes the 
placement of a prefabricated shed, split rail fencing and underground drainage piping within a 
regulated area. An Enforcement Order will be issued in advance of the next regular meeting.  

Page 5

 
3 
A Notice of Violation was issued on 5/28/26 to the owner of 65, 79 and 87 Barkhamsted Road 
for the stockpiling of vehicles and various materials within the upland review area of the West 
Branch of Salmon Brook. K. Bednaz also informed the Commission of a request from Station 
280 to reduce the required understory plantings by twenty-five percent.      
 
6. Commissioner Reports and Correspondence 
None 
 
7. Adjourn 
 
ON A MOTION by V. Dirienzo seconded by F. Jones, the Commission voted 6-0-0 to adjourn 
the meeting at 8:16 p.m. 
 
Respectfully submitted, 
 
 
 
Renee Deltenre 
Land Use Coordinator 
 

Page 6

Page 7

TOWN OF GRANBY 
Incorporated 1786 
15 North Granby Road 
Granby, Connecticut 06035-2102 
 
July 8, 2026 
 
James Fort 
94 Quarry Road 
Granby, CT 06035 
 
RE: 94 Quarry Road – J. Fort – Permit request to place a 12’ x 28’ prefabricated garage on crushed stone 
within a regulated area. 
 
Dear Mr. Fort: 
 
Please be advised that on July 8, 2026, the Inland Wetlands and Watercourses Commission (IWWC) Agent 
approved the subject application in accordance with the application and supporting documentation received to 
date.  
 
The following are the conditions of this approval.  
 
1. Permit includes the installation of underground conduit for future electrical to the shed directly from the house 
and removal of the existing 96 sq. ft. shed, as indicated in email correspondence. 
 
2. The Office of Community Development shall be notified at least 48 hours prior to the start of any 
construction activities. 
 
3. Town staff shall inspect installed erosion controls prior to the start of any work that results in earth 
disturbance activities, this includes, but is not limited to, grubbing and stump removal. 
 
4. All work shall be in conformance with the approval and application materials as submitted for this Permit 
Approval. Any modifications to the approved plans must be reviewed and approved by the Granby Inland 
Wetlands and Watercourses Commission or their designated Agent.  
 
5. No materials may be deposited outside of the work area, on the project site, without written approval from 
the IWWC or their designated Agent. 
 
6. Erosion controls shall be maintained until the site has achieved permanent stabilization. Permanent 
stabilization is defined as 70% permanent vegetation covering over 90% of the area. A stockpile of erosion 
controls shall remain on site to prepare controls as necessary. The IWWC shall be notified in writing at 
least 48 hours in advance of erosion controls being removed.  
 
7. Excavated soil shall not be brought off-property without the notification and approval of the Office of 
Community Development. The applicant shall supply the destination in writing for any excavated soil 
removed from the property.  
 
8. This permit is valid for a period of 5 years from the date of issuance. 
 
9. Upon completion of construction and site stabilization, the IWWC shall be notified in writing that work is 
complete, and a final inspection may be completed at that time. 
 
If you have any questions, please call the Office of Community Development at your earliest convenience. 
 
Sincerely, 
 
 
 
John Laudati 
Granby IWWC Chairman 

Page 8

Outlook
Re: 94 Quarry - Detached Garage
From Granby Wetlands Agent <wetlandsagent@granby-ct.gov>
Date Mon 6/8/2026 3:58 PM
To jimhfort@gmail.com <jimhfort@gmail.com>
Cc Abigail Kenyon <akenyon@granby-ct.gov>; Renee Deltenre <RDeltenre@granby-ct.gov>
2 attachments (4 MB)
94QuarryShedAerial2026.pdf; 94 Quarry Road Garage Application.pdf;
Hi James, 
Thank you for taking the time to answer my questions and layout the location of the garage. Per our conversation and my site visit, I
have attached the modified figures for you to review and confirm if the work is properly depicted. The garage footprint was revised
to show the additional 1-foot of crushed stone that will surround the structure. I have also revised the barrier erosion control to go a
bit father due to the wetlands behind the garage and to include the stockpile, unless you can tarp the entire pile, only if it can be
removed within a short time, noted on the figure.  If so, we will include these figures in your application. 
When responding to this email, please include the information in narrative form to be included in your application. 
1. Where will extra soil be deposited? If within the existing lawn area, it will need to be immediately stabilized with seed and a
thick mulch. As discussed, these are small areas. 
2. Please provide a narrative regarding your existing sheds. I have marked one with a blue "x" and the other with a yellow "x".
Please describe which will stay, which will go, and what will you do with the space once the shed is removed. 
3. Will there be a ramp to connect the garage to the pavement?
4. What will the shed be placed onto? I believe you said 5" of stone. 
Due to your proximity to the wetlands and the fact that you are in mapped wetlands, your application needs to be reviewed and
approved by the IWWC. Your application will go to the IWWC meeting this Wednesday at Town Hall, it starts at 7pm feel free to
attend in person or via zoom. If not, I can review your application to the IWWC. Your application will be received this Wednesday and
can be acted upon/approved at their next regularly scheduled meeting on July 10th. 
Looking to tighten up the application and present the information to them this Wednesday evening. As always, please contact me
with any questions or comments. 
SINCERELY, 
THE GRANBY INLAND WETLANDS AGENT
From: Renee Deltenre <RDeltenre@granby-ct.gov>
Sent: Tuesday, May 26, 2026 11:25 AM
To: Granby Wetlands Agent <wetlandsagent@granby-ct.gov>
Subject: 94 Quarry - Detached Garage
 
Morning Kate,
We received the attached application on Friday. The property owner is looking to place a prefabricated garage on crushed stone within a wetland. 
Thank you,
Renee
                                                                                       
Renee Deltenre

Page 9

Page 10

94 Quarry Road - Shed Locations 
Ganby, CT - Inland Wetlands Application 2026 
Legend 
94 Quarry Rd
80 ft
N➤➤
N
X
X

Page 11

TOWN OF GRANBY 
  Office of Community Development, Inland Wetlands and Watercourses Commission 
Telephone: (860) 844-5318, www.granby-ct.gov 
App
lication for Inland Wetlands & Watercourses Activity 
Application For: Permit  Extension  Modification (Existing Permit/Application #):  __________________________ 
Wetlands Map Amend.  Request for Review Other: 
Property Location and Nearest Intersection: 
Size of Parcel:_________ Zone: ________ Map/Lot: ____________ Current Use: ___________________________ 
Applicant’s Name:  
Complete Address:  
Daytime Phone:   Evening Phone:     Fax: 
Email: 
Owner’s Name: 
If the owner is a corporation, or other non-individual entity, include the primary contact information 
Complete Address: 
Phone Daytime Phone:     Evening Phone:     Fax: 
Applicant’s Representative:  
Complete Address:  
Daytime Phone:  Evening Phone:  Fax: 
*****
**************************PLEASE ATTACH ADDITIONAL SHEET IF NECESSARY************************************** 
Project Name and Brief Description (i.e. residential, agricultural, commercial, number of lots, etc.):  
 
Is any portion of the property located within 500 feet of an adjoining municipality?  
Wetlands Located on Property (in square feet (sq. ft.)):   Wetlands to be impacted (sq. ft.):  
Watercourses Located on Property?  Name or Type of Watercourse:   
Are Proposed Activities Located within the 100-Year Floodplain?   Floodway?  
Are there slopes with grades in excess of 15% located on the property?  
Do Proposed Activities Require Review by the PZC?  
    *********SEE APPLICATION CHECKLIST ON BACK for MINIMUM APPLICATION REQUIREMENTS********** 
The applicant understands that this application is to be considered complete only when all information and documents required  by 
the Commission have been submitted. The undersigned warrants the truth of all statements contained herein and in all supporting  
documents according to the best of his/her knowledge and belief. Permission is granted to the Town of Granby, Inland Wetlands & 
Watercourses Commission, and its agent (s) to inspect the subject land, at reasonable times, during the pendency of an application 
and for the life of the permit. 
Applicant’s Signature: Date: 
       Owner’s Signature:  Date: 
FOR OFFICE USE 
   Application #: Date Submitted: 
   Fee amt./Check or Cash: Date of Receipt: 
   Agent Ruling: Date Approved/Denied: 
See Reverse Side for Conditions of Approval or Reason for Denial 
86 Case Street
Jonathan Vosburgh
86 Case Street
R4A
2.92 Ac.
H-10/66/25
Vacant
860-916-7495
860-916-7495
vosburghjon@gmail.com
Joseph A Bazyk
F. A. Hesketh & Assoc., Inc.
6 Creamery Brook, East Granby, CT  06026  
860-653-8000
Consruction of single-family home with attached garage, pool, patio, septic system and utilities.
No
0.0
No
No
No, site plan approval only
Yes
16,740
Pond and drainage ditch from pond outlet.
Only on banks of man-made pond.
85 Case Street, West Granby, CT 06090 

Page 12

1060.3
1061.0
1052.5
1052.5 1061.5
1061.0
1060.70
1061.0
1066.73
1066.73
1065.80
1065.80
1058.5
1061.0
1060.48
1060.00
1059.65
1059.41
1059.65
1059.41
1059.5
1061.0
1061.0
1061.5
1058.0
1061.0
1057.51056.5
SOIL PROFILE
PERC TEST RESULTS
TEST PIT I.D.
PT-1 = 267 MIN./18 IN. = 14.83 MIN./IN.
PT-2 = 259 MIN./22 IN. = 11.77 MIN./IN.
100.00
194

Page 13

From: Granby Wetlands Agent
To: Jon Vosburgh
Cc: Abigail Kenyon; Renee Deltenre; Cassidy Davidson; Guy Hesketh
Subject: Re: 86 Case Rd Wetlands resubmission
Date: Wednesday, July 1, 2026 5:44:17 PM
Thank you, Jon. To confirm there will be no machinery used to prepare the base for the pavers? If machinery is intended, please narrate the path of access. Ty Kate
Get Outlook for iOS
From: Jon Vosburgh <vosburghjon@gmail.com>
Sent: Tuesday, 30 June 2026 13:06:58
To: Granby Wetlands Agent <wetlandsagent@granby-ct.gov>
Cc: Abigail Kenyon <akenyon@granby-ct.gov>; Renee Deltenre <RDeltenre@granby-ct.gov>; Cassidy Davidson <CassidyRoswelldev@outlook.com>; Guy Hesketh
<ghesketh@fahesketh.com>
Subject: Re: 86 Case Rd Wetlands resubmission
 
 
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
 
Kate, thank you for the clarification. We will make the changes and have them back to the town sometime tomorrow. Below is the narrative that you asked me to outline
concerning the walks and patio by the pond.
As part of this application we are including walkways and a small patio on the edge of the pond as shown on the revised plan.  We are proposing approximately 36 inch wide
walks and approximately 8' x 10’ patio. The surface of the walks and patio will be hand laid concrete pavers. We acknowledge that any further disturbance will require the
appropriate erosion control.
  Please let me know if this is sufficient for the final submittal. Thank you very much
On Jun 30, 2026, at 2:47 PM, Granby Wetlands Agent <wetlandsagent@granby-ct.gov> wrote:
The incorrect boundary
Get Outlook for iOS
From: Jon Vosburgh <vosburghjon@gmail.com>
Sent: Tuesday, 30 June 2026 12:20:13
To: Granby Wetlands Agent <wetlandsagent@granby-ct.gov>
Cc: Abigail Kenyon <akenyon@granby-ct.gov>; Renee Deltenre <RDeltenre@granby-ct.gov>; Cassidy Davidson <CassidyRoswelldev@outlook.com>; Guy Hesketh
<ghesketh@fahesketh.com>
Subject: Re: 86 Case Rd Wetlands resubmission
 
 
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
 
Kate are you talking about the Wetlands flagging that is shown within our new boundary. We can take that off. is there anything else?
On Jun 30, 2026, at 12:11 PM, Granby Wetlands Agent <wetlandsagent@granby-ct.gov> wrote:
Thank you, Jon, 
The plan has wetland boundaries is a bit confusing and not correct. Please take those boundaries off and resubmit. We will need paper copies
for next Wednesday's meeting. The IWWC will need to make the approval as there is direct disturbance to the wetlands with this layout. I
anticipate they will vote for an approval at next Wednesday's meeting. 
SINCERELY, 
THE GRANBY INLAND WETLANDS AGENT
<image.png>
From: Jon Vosburgh <vosburghjon@gmail.com>
Sent: Monday, June 29, 2026 9:07 AM
To: Abigail Kenyon <akenyon@granby-ct.gov>; Granby Wetlands Agent <wetlandsagent@granby-ct.gov>; Renee Deltenre <RDeltenre@granby-ct.gov>; Cassidy
Davidson <CassidyRoswelldev@outlook.com>
Subject: 86 Case Rd Wetlands resubmission
 
 
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
 
Hi All, attached is the revised plans reflecting Kate's requirements as discussed in the field with myself and Ian Cole. Please review and let me know if there's
anything else that is needed. Do I need to deliver paper copies for the commission prior to the next public hearing on July 8th? If so please refresh my
memory on how many and what size copies you need. Thank you very much
Jonathan Vosburgh
Roswell Development LLC
125 Lasalle Rd
Suite 202
West Hartford CT 06107

Page 14

TOWN OF GRANBY 
Incorporated 1786 
15 North Granby Road 
Granby, Connecticut 06035-2102 
 
1 
July 8, 2026 
 
 
 
Jonathan Vosburgh 
6 Brighton Park Way 
Bloomfield, CT 06002 
 
RE: 86 Case Street – J. Vosburgh – Permit request to construct a single-family home with associated 
site improvements within a regulated area. 
 
Dear Mr. Vosburgh: 
 
Please be advised that on July 8, 2026, the Inland Wetlands and Watercourses Commission (IWWC) 
Agent approved the subject application in accordance with the application and supporting documentation 
received to date.  
 
The following are the conditions of this approval.  
 
1. Notification Requirements 
a. The Office of Community Development shall be notified at least 48 hours prior to the start of any 
activities; 
b. When barrier erosion controls have been installed prior to earth disturbance activities; and 
c. Upon completion of project activities. 
 
2. Municipal Inspection 
a. Town staff shall inspect installed erosion controls prior to the start of work that results in earth 
disturbance activities, this includes, but is not limited to, grubbing and stump removal. 
b. Standard inspections of the approved improvements shall be made throughout active 
construction and upon final stabilization of exposed soils to ensure regulatory compliance and 
protection of wetland resource areas. 
 
3. Prior to the start of work, the applicant shall submit a bond in the amount of $500 to the Town of 
Granby for payments made to the Town Wetlands Officer for monitoring the development for 
compliance with this approval. Should the costs exceed this amount the applicant will be billed for the 
difference. Any funds not used for the project will be remitted to the applicant at the conclusion of the 
project. As used in this condition, the term Town Wetlands Officer includes any person or firm 
designated by the Director of Community Development for the purposes of monitoring the 
development activities to assure compliance with this approval and the IWWC Regulations. 
 
4. All work shall be in conformance with the approval and application materials as submitted for this 
Permit Approval. Any modifications to the approved plans must be reviewed and approved by the 
Granby Inland Wetlands and Watercourses Commission or their designated Agent.  
 
5. Erosion controls shall be maintained until the site has achieved permanent stabilization. Permanent 
stabilization is defined as 70% permanent vegetation covering over 90% of the area. A stockpile of 
erosion controls shall remain on site to prepare controls as necessary. The IWWC shall be notified in 
writing at least 48 hours in advance of erosion controls being removed.  
 
6. Excavated soil shall not be brought off-property without the notification and approval of the Office of 
Community Development. The applicant shall supply the destination in writing for any excavated soil 
removed from the property.  

Page 15

 
2 
7. Only clean fill, free of invasive species, shall be brought on-site. Utilizing on-site fill will reduce, if not 
eliminate the potential for the introduction and potential colonization of new invasive species into this 
area of the watershed.   
 
8. This permit is valid for a period of 5 years from the date of issuance. 
 
Please provide a Mylar copy of the approved maps to the Office of Community Development for the 
signature of the Inland Wetlands and Watercourses Commission’s Chairman at your earliest 
convenience. Once the approved Mylar is signed by the Commission’s Chairman, you will need to file it in 
the office of the Town Clerk. 
 
If you have any questions, please contact the Office of Community Development at your earliest 
convenience. 
 
Sincerely, 
 
 
 
John Laudati 
Granby IWWC Chairman 
 

Page 16

Page 17

Page 18

Page 19

Page 20

Page 21

Page 22

Page 23

 
JACKSON  ENVIRONMENTAL, LLC 
- Environmental and Soil Consultants - 
 
289 High Road, Kensington, Connecticut  06037 
Telephone and Fax:  860-224-4063 
 
March 18, 2025 
 
 
Harry and Susan Werner 
20 Godard Road 
North Granby, CT 06060 
 
 
Re: Soils and Wetlands / Watercourse Delineation Report 
      #5 Godard Road, North Granby, CT 
      JE Project No. 25-06 
 
 
 Dear Mr. and Mrs. Werner: 
  
The wetlands and watercourses within the northern section of an approximate 7.4-acre parcel of 
land identified as 5 Godard Road, North Granby were delineated on March 15, 2025. The subject 
property is shown on the December 2007 Property Survey Showing Conservation Easements to 
be Granted to Granby Land Trust, Inc., Property Owned by Susan H. Werner, 5, 20 & 21 Godard 
Road, Granby Conn., prepared by Harry C. Cotton & Associates.   The wetland / watercourse 
boundary delineations were limited to the vicinity of a proposed residential development in the 
northern section of the parcel. 
 
Published Soil Map Units 
 
The Web Soil Survey1 identified the following map unit for the #5 Godard Road Property:  
 
Gloucester gravelly sandy loam, 8 to 15% slope (57C) 
 
The U.S. Department of Agriculture, Natural Resources Conservation Service describes the  
Gloucester soil series as “very deep, somewhat-excessively-drained-soils formed in sandy glacial 
till sediments.  They are on nearly level to very steep moraines, hills, and ridges. Slope ranges 
from 0 to 50 percent.”2   
 
Fluvaquents-Udifluvents (109) 
 
Fluvaquents are poorly-drained soils composed of sandy and/or loamy alluvium. This soil type is 
on flood plains and stream valleys. Udifluvents have a moderately-well-drained to well-drained 
drainage classification and are found on flood plains and stream valleys. The parent material for 
the soil is sandy and/or loamy alluvium.  Alluvial soils are regulated as wetlands in Connecticut. 
 
 
1 The Web Soil Survey.  USDA, Natural Resources Conservation Service. http://websoilsurvey.nrcs.usda.gov 
  
2 https://soilseries.sc.egov.usda.gov/OSD_Docs/G/GLOUCESTER.html 
 

Page 24

                                                                          
Harry & Susan Werner           JACKSON  
March 18, 2025               ENVIRONMENTAL, LLC 
 
 
Field Notes 
 
The uplands soils within the project area were consistent with the Gloucester gravelly sandy 
loam soil map unit. The soil is suitable for the location and design of subsurface sewage 
treatment and disposal systems. 
   
A narrow watercourse, tributary to the East Branch of the Salmon Brook, flows in a general 
northerly direction within the subject property. 
 
Wetland / watercourse boundary flags ‘A-1’ through ‘A-27 were placed along the along the 
western side of the watercourse channel. The flags extend from the vicinity of the northern 
property boundary to a concrete weir within the watercourse channel located adjacent to the Frog 
Pond. The A-series flags bordered alluvial terraces composed of Fluvaquents and poorly-drained 
soils exhibiting groundwater seeps or drainageways. 
 
Wetland boundary flags ‘B-1’ through ‘B-11’ were placed around the steep side-slopes bordering 
the Frog Pond. 
 
Wetland / watercourse boundary flags ‘1B-1’ through ‘1B-6’ were placed around poorly-drained 
soils within an elliptical depression located down-slope from the pond outlet.  The wetland 
drained to a an approx. 8 to 12-inch reinforced concrete pipe beneath Godard Road.  
 
 
Please contact me at (860) 213-3152 with any questions or comments regarding this report. 
 
Sincerely, 
 
JACKSON ENVIRONMENTAL, LLC 
 
William A. Jackson, R.S., L.E.P. 
Registered Soil Scientist 

Page 25

Page 26

Page 27

Page 28

Page 29

Page 30

KEY MAP
Harmony Hill Road
8 Lot Residential Subdivision
Granby, Connecticut
Map D-43 Block 21 Lot 56
Harmony Hill Farms
S:\Acad\2026 Civil 3D\2026-028  Roswell - Harmony Hill Rd., Granby\Russo Drawings\2026-028.dwg, 1:1

Page 31

KEY MAP
S:\Acad\2026 Civil 3D\2026-028  Roswell - Harmony Hill Rd., Granby\Russo Drawings\2026-028.dwg, 1:1

Page 32

KEY MAP
S:\Acad\2026 Civil 3D\2026-028  Roswell - Harmony Hill Rd., Granby\Russo Drawings\2026-028.dwg, 1:1

Page 33

SPECIFICATIONS
Time Of Year
Site Preparation
Seed Selection
Seedbed Preparation
Seed Application
Mulching
MAINTENANCE
(PS)
SPECIFICATIONS
Materials
Types of Mulches 
1. Hay:
2. Straw:
3. Cellulose Fiber:
Tackifiers
Emulsified asphalts are specifically prohibited for use as
tackifiers due to their potential for causing water pollution following its
application.
Nettings
Site Preparation
Application
Timing:
Mulch For Seed
Spreading:
Anchoring:
MAINTENANCE
(MS)
SPECIFICATIONS
Site Preparation
Seedbed Preparation
Seeding
Mulching
MAINTENANCE
(TS)
GEOTEXTILE SILT FENCE (GSF)
ANTI-TRACKING PAD DETAIL (CE)
SPECIFICATIONS
Mechanical Sweeping
Water
Non-Asphaltic Soil Tackifier
MAINTENANCE
(DC)
PAVED DRIVEWAY DETAIL
CB GRATE INLET PROTECTION (SILT SACK)
DRYWELL DETAIL
S:\Acad\2026 Civil 3D\2026-028  Roswell - Harmony Hill Rd., Granby\Russo Drawings\2026-028.dwg, 1:1

Page 34

Page 35

Page 36

Page 37

Page 38

Page 39

Page 40

TOWN OF GRANBY 
Public Hearing 
Inland Wetlands and Watercourses Commission (IWWC) 
  
There will be a public hearing conducted by the IWWC on Wednesday, June 10, 2026, at 7:00 
p.m. in the Granby Town Hall Meeting Room, 15 North Granby Road to hear and consider the 
following item: 199 Broad Hill Road – T. Kurnicki – Permit request to construct a single-family 
home with associated site improvements within a regulated area. 
 
At the hearing interested persons may appear and written communications will be received. 
Copies of the proposal are on file in the Community Development Office.    
  
 
To the Hartford Courant: 
 
Please publish on the following dates: 
May 29, 2026, and June 5, 2026, in the Connecticut Section Zone 5 
 
Please send billing to the Town of Granby 15 North Granby Road, Granby, CT 06035 
 
Approved as written - No affidavit of publication to be submitted. 
  
Account # 113533 
 
Renee Deltenre 
860-844-5319 
 
 

Page 41

Page 42

Page 43

Page 44

 
 
 
Wetland/Watercourse Delineation Memo 
Delineation of 199 Broad Hill Road 
Granby, CT 
June 2026    
 
 
1. INTRODUCTION 
At the request of  Thomas Kurnicki , EarthView Design’s  professional soil scientist  conducted a field 
investigation at 199 Broad Hill Road in the town of Granby, Connecticut (the site). The purpose of the field 
investigation was to document and delineate wetlands and watercourses, if present. The field investigation 
was conducted on June 6, 2026. 
2. RESULTS  
In the  area of investigation  (the site) , the Ordinary High Water ( OHW) elevation  associated with one 
presumed perennial watercourse was demarcated in the field. Additionally, three  State- and Federally-
regulated wetlands were demarcated in the field. The perennial watercourse may be intermittent, as the site 
assessment was not conducted in the driest time of the year. If the watercourse is intermittent, then the 
wetlands delineated at the site would be State-only regulated. 
Investigations north of Broad Hill Road did not reveal wetland soils or wetland vegetation. The soils in this 
area consisted of sandy, roadside fill with asphalt pieces and small rocks best classified as human-altered 
Udorthents. Soil samples along the roadway met refusal at about 2 inches deep. Vegetation observed in this 
area was deer tongue grass  (Dichanthelium clandestinum ), broad dock  (Rumex obtusifolius ), mugwort  
(Artemisia vulgaris), Virginia creeper (Parthenocissus quinquefolia), and Meadow hawkweed (Hieracium 
caespitosum). See the photographs in Appendix A. 

Page 45

3. DETAILED RESOURCE DESCRIPTIONS 
Unnamed perennial watercourse : An unnamed perennial watercourse  flows from the southwest to the 
northeast through the western portion of the site. Flows were consistent, but the depth was less than 1 inch, 
so this stream may be intermittent at the driest times of the year.  
At the time of the investigation the stream was less than 1-inch deep, flowing downhill into the wetlands 
described below. The stream channel was about 2-6 feet wide, mostly shaded, and had approximately 2-6 
inch high banks. Both banks were vegetated with marsh fern ( Thelypteris palustris ), poison ivy 
(Toxicodendron radicans ), interrupted fern (Osmunda claytoniana ), jewelweed ( Impatiens capensis ), 
Northern spicebush (Lindera benzoin), and Jack-in-the-pulpit (Arisaema triphyllum). The stream substrate 
was mostly sandy with small rocks. This stream was channelized flowing downhill, then becomes diffuse 
and loses its channel in the wetlands, then is channelized again as it exits the wetlands.  
Wetland A/B:  Wetland A/B is a Palustrine Emergent/Palustrine Scrub- shrub wetland (PEM/PSS) 
associated with the unnamed perennial watercourse. Vegetation in Wetland A/B includes red maple (Acer 
rubrum) trees (on the edge) ; silky dogwood (Cornus amomum), Northern spicebush (Lindera benzoin), 
multiflora rose (Rosa multiflora), and speckled alder (Alnus incana)  shrubs; sensitive fern (Onoclea 
sensibilis), marsh fern, jewelweed, cinnamon fern ( Osmundastrum cinnamomeum ), hop sedge (Carex 
lupuliformis), and blue flag iris (Iris versicolor) in the herbaceous layer; and  poison ivy and fox grape (vitis 
labrusca) in the liana layer.  The soil in this wetland is mapped as Natural Resource Conservation Service 
(NRCS) Hollis-Chatfield-rock outcrop complex, 15 to 45 percent slopes. However, the soil observed in the 
wetland is a very poorly drained Leicester fine sandy loam. 
Wetland C: Wetland C is a Palustrine Emergent wetland (PEM) located on the western side of the perennial 
watercourse on the southwestern portion of the property. This wetland is sparsely vegetated with jewelweed 
and has a hillside seep adding to its hydrology. The soil in this wetland is mapped as NRCS Gloucester 
gravely sandy loam, 15 to 35 percent slopes, extremely stony. However, the soil observed in the wetland is 
a very poorly drained Leicester fine sandy loam. 
Wetland D: Wetland D is a Palustrine Emergent wetland (PEM) located on the western side of the perennial 
watercourse, uphill from Wetland C, on the southwestern portion of the property. This wetland is sparsely 
vegetated with jewelweed, jack-in-the-pulpit, and marginal wood fern ( Dryopteris marginalis) and has a 
hillside seep adding to its hydrology. The soil in this wetland is mapped as NRCS Gloucester gravely sandy 
loam, 15 to 35 percent slopes, extremely stony. However, the soil observed in the wetland is a very poorly 
drained Leicester fine sandy loam. 
4. NRCS MAPPED SOILS 
Only those soils found on the project area are described below. See Appendix B for soil mapping. 
Hollis-Chatfield-rock outcrop complex, 15 to 45 percent  slopes: The Hollis component makes up 35 
percent of the map unit. Slopes are 15 to 45 percent. This component is on bedrock controlled hills, bedrock 
controlled ridges, and uplands. The parent material consists of loamy melt -out till derived from granite 
and/or schist and/or gneiss. The natural drainage class is somewhat excessively drained. This soil is not 
flooded. It is not ponded. This soil does not meet hydric criteria. 
The Chatfield component makes up 30 percent of the map unit. Slopes are 15 to 45 percent. This component 
is on bedrock controlled hills, bedrock controlled ridges, and uplands. The parent material consists of 
coarse-loamy melt-out till derived from granite and/or schist and/or gneiss. The natural drainage class is 
well drained. This soil does not meet hydric criteria. 
 

Page 46

Leicester fine sandy loam: The Leicester component makes up 80 percent of the map unit. Slopes are 0 to 
5 percent. This component is on depressions on uplands, drainageways on uplands. The parent material 
consists of coarse-loamy melt-out till derived from granite and/or schist and/or gneiss. The natural drainage 
class is poorly drained. This soil meets hydric criteria. 
Gloucester gravely sandy loam, 15 to 35 percent slopes, extremely stony: 
The Gloucester component makes up 80 percent of the map unit. Slopes are 15 to 35 percent. This 
component is on hills on uplands. The parent material consists of sandy and gravelly melt -out till derived 
from granite and/or schist and/or gneiss. The natural drainage class is somewhat excessively drained. This 
soil is not flooded. It is not ponded. This soil does not meet hydric criteria. 

Page 47

 
 
 
 
APPENDIX A: PHOTOGRAPHS 
 
Upland area north of the property across Broad Hill Road looking southwest 
 
Upland area north of the property across Broad Hill Road looking northeast 

Page 48

 
Watercourse looking southwest 
 
Watercourse looking southeast 

Page 49

 
 
Wetland A/B looking northeast 
 
Wetland A/B looking northeast 
  

Page 50

 
 
 
Wetland C looking northwest 
 
Wetland D looking south 
  

Page 51

 
 
 
APPENDIX B: WEB SOIL SURVEY 

Page 52

Soil Map—State of Connecticut, Western Part
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
6/5/2026
Page 1 of 3
4646920 4646980 4647040 4647100 4647160 4647220 4647280
4646920 4646980 4647040 4647100 4647160 4647220 4647280
676900 676960 677020 677080 677140 677200 677260 677320 677380 677440
676900 676960 677020 677080 677140 677200 677260 677320 677380 677440
41°  57' 28'' N
72°  51' 57'' W
41°  57' 28'' N
72°  51' 30'' W
41°  57' 15'' N
72°  51' 57'' W
41°  57' 15'' N
72°  51' 30'' WN
Map projection: Web Mercator   Corner coordinates: WGS84   Edge tics: UTM Zone 18N WGS84
0 100 200 400 600
Feet
0 40 80 160 240
Meters
Map Scale: 1:2,780 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.

Page 53

MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at 
1:12,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause 
misunderstanding of the detail of mapping and accuracy of soil 
line placement. The maps do not show the small areas of 
contrasting soils that could have been shown at a more detailed 
scale.
Please rely on the bar scale on each map sheet for map 
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL: 
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator 
projection, which preserves direction and shape but distorts 
distance and area. A projection that preserves area, such as the 
Albers equal-area conic projection, should be used if more 
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as 
of the version date(s) listed below.
Soil Survey Area: State of Connecticut, Western Part
Survey Area Data: Version 6, Sep 16, 2025
Soil map units are labeled (as space allows) for map scales 
1:50,000 or larger.
Date(s) aerial images were photographed: Jun 14, 2022—Oct 6, 
2022
The orthophoto or other base map on which the soil lines were 
compiled and digitized probably differs from the background 
imagery displayed on these maps. As a result, some minor 
shifting of map unit boundaries may be evident.
Soil Map—State of Connecticut, Western Part
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
6/5/2026
Page 2 of 3

Page 54

Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
38C Hinckley loamy sand, 3 to 15 
percent slopes
1.4 3.6%
51B Sutton fine sandy loam, 0 to 8 
percent slopes, very stony
1.1 2.8%
57B Gloucester gravelly sandy 
loam, 3 to 8 percent slopes
0.5 1.3%
59D Gloucester gravelly sandy 
loam, 15 to 35 percent 
slopes, extremely stony
6.0 15.2%
62D Canton and Charlton fine 
sandy loams, 15 to 35 
percent slopes, extremely 
stony
1.3 3.2%
73E Charlton-Chatfield complex, 15 
to 45 percent slopes, very 
rocky
9.2 23.0%
75C Hollis-Chatfield-Rock outcrop 
complex, 3 to 15 percent 
slopes
4.0 10.0%
75E Hollis-Chatfield-Rock outcrop 
complex, 15 to 45 percent 
slopes
8.8 22.1%
109 Fluvaquents-Udifluvents 
complex, frequently flooded
7.5 18.8%
Totals for Area of Interest 39.9 100.0%
Soil Map—State of Connecticut, Western Part
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
6/5/2026
Page 3 of 3

Page 55

Page 56

Page 57

Page 58

Page 59

Page 60

Page 61

 
Kevin Clark, PEL  (860) 844-5318 
Town Engineer  townengineer@granby-ct.gov 
Town of Granby   
15 North Granby Road   
Granby, CT 06035   
 
 
MEMORANDUM 
 
Date: July 2, 2026 
 
RE: “Residential Home Concept Plan , prepared for Thomas Kurnicki, 199 Broad Hill Road, Granby, 
Connecticut, Scale:1”=30’, March 30, 2026, Revised 6/30/26, Barresi Associates, LLC.” 
 
Comments: 
 
Sheet 2 of 6 
: 
1. Provide drainage computations.  May need a full- sized catch basin rather than a “ Yard 
Drain,” due to peak runoff.  The drainage area is a little over 4 acres. 
2. New manhole in the right-of-way to conform to town requirements.  Is it possible to use a 
catch basin and intercept the flow in the shoulder before it drains on the pavement? 
3. Do not fill in the right-of-way.  Consider using a rip rap slope to steepen the grade. 
4. Provide a shoulder for the driveway along the downhill side .  Not possible to grade up to 
the edge of the pavement. 
5. Add SL to legend and provide a detail on sheet 5. 
 
 
by: Kevin Clark, PEL, Town Engineer 
 

Page 62

TOWN OF GRANBY 
Incorporated 1786 
15 North Granby Road 
Granby, Connecticut 06035-2102 
 
1 
July 8, 2026 
 
 
 
Thomas Kurnicki 
1300 22nd Street 
Apartment #111 
San Francisco, CA 94107 
 
RE: 199 Broad Hill Road – T. Kurnicki – Permit request to construct a single-family home with 
associated site improvements within a regulated area. 
 
Dear Mr. Kurnicki: 
 
Please be advised that on July 8, 2026, the Inland Wetlands and Watercourses Commission (IWWC) 
Agent approved the subject application in accordance with the application and supporting documentation 
received to date.  
 
The following are the conditions of this approval.  
 
1. Notification Requirements 
a. The Office of Community Development shall be notified at least 48 hours prior to the start of any 
activities; 
b. When barrier erosion controls have been installed prior to earth disturbance activities; and 
c. Upon completion of project activities. 
 
2. Municipal Inspection 
a. Town staff shall inspect installed erosion controls prior to the start of work that results in earth 
disturbance activities, this includes, but is not limited to, grubbing and stump removal. 
b. Standard inspections of the approved improvements shall be made throughout active 
construction and upon final stabilization of exposed soils to ensure regulatory compliance and 
protection of wetland resource areas. 
 
3. The applicant shall reimburse the Town of Granby for all payments made to the Town Wetlands 
Officer for monitoring the development for compliance with this approval. The reimbursement rate is 
$90 per hour for the services of the Town Wetlands Officer. The applicant shall deposit with the Town 
of Granby the sum of $500 to be applied to the costs as described herein. Should the costs exceed 
this amount, the applicant will be billed for the difference. Any funds not used for the project will be 
remitted to the applicant at the conclusion of the project. As used herein, the term Town Wetlands 
Officer includes any person or firm designated by the Director of Community Development for the 
purposes of monitoring the development activities to assure compliance with this approval and the 
IWWC Regulations. 
 
4. All work shall be in conformance with the approval and application materials as submitted for this 
Permit Approval. Any modifications to the approved plans must be reviewed and approved by the 
Granby Inland Wetlands and Watercourses Commission or their designated Agent.  
 
5. Erosion controls shall be maintained until the site has achieved permanent stabilization. Permanent 
stabilization is defined as 70% permanent vegetation covering over 90% of the area. A stockpile of 
erosion controls shall remain on site to prepare controls as necessary. The IWWC shall be notified in 
writing at least 48 hours in advance of erosion controls being removed.  
 

Page 63

 
2 
6. Excavated soil shall not be brought off-property without the notification and approval of the Office of 
Community Development. The applicant shall supply the destination in writing for any excavated soil 
removed from the property.  
7. Only clean fill, free of invasive species, shall be brought on-site. Utilizing on-site fill will reduce, if not 
eliminate the potential for the introduction and potential colonization of new invasive species into this 
area of the watershed.   
 
8. This permit is valid for a period of 5 years from the date of issuance. 
 
Please provide a Mylar copy of the approved maps to the Office of Community Development for the 
signature of the Inland Wetlands and Watercourses Commission’s Chairman at your earliest 
convenience. Once the approved Mylar is signed by the Commission’s Chairman, you will need to file it in 
the office of the Town Clerk. 
 
If you have any questions, please contact the Office of Community Development at your earliest 
convenience. 
 
Sincerely, 
 
 
 
John Laudati 
Granby IWWC Chairman 
 

Page 64

TOWN OF GRANBY 
Public Hearing 
Inland Wetlands and Watercourses Commission (IWWC) 
  
There will be a public hearing conducted by the IWWC on Wednesday, July 8, 2026, at 7:00 
p.m. in the Granby Town Hall Meeting Room, 15 North Granby Road to hear and consider the 
following item: 37 Hartford Avenue – F. Devine – Permit application for regulated activities in 
connection with the development of a 16-unit apartment building and associated site 
improvements.  
 
At the hearing interested persons may appear and written communications will be received. 
Copies of the proposal are on file in the Community Development Office.    
  
 
To the Hartford Courant: 
 
Please publish on the following dates: 
June 26, 2026, and July 3, 2026, in the Connecticut Section Zone 5 
 
Please send billing to the Town of Granby 15 North Granby Road, Granby, CT 06035 
 
Approved as written - No affidavit of publication to be submitted. 
  
Account # 113533 
 
Renee Deltenre 
860-844-5319 
 
 

Page 65

 
 
R LEVESQUE ASSOCIATES, INC. 
A L AND PL ANNING SERVICES COMPANY 
40 School Street, Westfield, MA 01085 
p 413.568.0985  ·  f 413.568.0986  ·  www.rlaland.com 
 
Application for Inland Wetlands & 
Watercourses Activity 
Under the Inland Wetlands & Watercourses Act & the Town of Granby Inland Wetlands and 
Watercourse Regulations 
 
Proposed Residential Development 
 
Project Location: 
37 Hartford Avenue 
Granby, Connecticut 06035 
(Parcel ID: 4254) 
 
Submitted To: 
Town of Granby Inland Wetlands & Watercourses Commission 
15 North Granby Road 
Granby, Connecticut 06035 
 
Applicant: 
Forrest Devine 
129 Lovers Lane 
Granville, Massachusetts 01034 
 
Property Owner: 
Howland Partners, LLC 
39 Brown Road 
South Kent, Connecticut 06785 
 
 
RLA Project File No. 251219 
June 1, 2026 

Page 66

TABLE OF CONTENTS 
 
SECTION                            
      
1. COVER LETTER 
2. ADMINISTRATIVE FORMS 
         2.1     APPLICATION FOR INLAND WETLNDS & WATERCOURSES ACTIVITY 
        2.2     APPLICATION CHECKLIST 
         2.3     FEE SCHEDULE 
        2.4     STATEWIDE INLAND WETLANDS & WATERCOURSES ACTIVITY REPORT FORM  
3.    PROJECT NARRATIVE  
4.    WETLAND SCIENTIST / SOIL REPORT 
5.    FIGURES 
         5.1     FIGURE 1 – TOPOGRAPHIC MAP 
        5.2     FIGURE 2 – FEMA FLOODPLAIN MAP 
        5.3     FIGURE 3 – NRCS SOIL MAP 
        5.4     FIGURE 4 – NATURAL DIVERSITY DATA BASE 
6.    ABUTTER NOTIFICATION 
         6.1     ABUTTER LIST – 100’ 
        6.2   ABUTTER NOTIFICATION LETTER (TO BE PROVIDED UPON CONFIRMATION I F PUBLIC 
HEARING IS NECESSARY) 
 
 
 
 
LIST OF APPENDICES 
 
APPENDICES                            
 
APPENDIX A: SITE PLAN SET 
APPENDIX B: STORMWATER REPORT

Page 67

 
 
1.   COVER LETTER 
                                                                                                       

Page 68

R LEVESQUE ASSOCIATES, INC. 
40 School Street, P.O. BOX 640, Westfield, MA 01085 
p 413.568.0985  ·  f 413.568.0986  ·  www.rlaland.com 
 
A L AND PL ANNING SERVICES COMPANY 
 
June 1, 2026 
 
John L. Laudati, Chairman 
Town of Granby Inland Wetlands & Watercourses Commission  
15 North Granby Road  
Granby, Connecticut 06035 
 
RE:  Proposed Residential Development 
37 Hartford Avenue  
Granby, Connecticut 06035  
(Parcel ID: 4254) 
RLA Project File No. 251219 
 
Dear Chairman Laudati:  
 
On behalf of the applicant, Forrest Devine, please find the requisite number of copies of an Application 
for Inland Wetlands & Watercourses Activity and associated documentation. The applicant proposes the 
construction of a multifamily residential development with associated site improvements within the 100’ 
Upland Review Area to a Wetland and 200’ Upland Review Area to a Watercourse (tributary to “Salmon 
Brook”). 
 
Included within this submission package is the requisite filing fee. As required, a  copy of this submittal 
has been provided electronically via email to the Town of Granby’s staff. 
 
We are respectfully requesting to be placed on the Agency’s next available agenda for review . Should 
you have any questions or comments regarding this filing, please do not hesitate to contact our office at 
your earliest convenience.   
 
Sincerely, 
R LEVESQUE ASSOCIATES, INC.  
 
 
 
Ryan Nelson 
Wetland/Soil Scientist & Project Manager 

Page 69

 
 
 
2.    ADMINISTRATIVE FORMS  
2.1     APPLICATION FOR INLAND WETLNDS & WATERCOURSES ACTIVITY 
2.2     APPLICATION CHECKLIST 
2.3     FEE SCHEDULE 
2.4     STATEWIDE INLAND WETLANDS & WATERCOURSES ACTIVITY REPORT FORM  
 

Page 70

TOWN OF GRANBY 
 Office of Community Development, Inland Wetlands and Watercourses Commission 
Telephone: (860) 844-5318, www.granby-ct.gov 
Ap
plication for Inland Wetlands & Watercourses Activity 
Application For: Permit  Extension  Modification (Existing Permit/Application #):  __________________________ 
Wetlands Map Amend.  Request for Review Other: 
Pr
operty Location and Nearest Intersection: 
Size of Parcel:_________ Zone: ________ Map/Lot: ____________ Current Use: ___________________________ 
Applicant’s Name:  
Complete Address:  
Daytime Phone:      Evening Phone:          Fax: 
Email: 
Ow
ner’s Name: 
If the owner is a corporation, or other non-individual entity, include the primary contact information 
Complete Address:  
Phone Daytime Phone:     Evening Phone:     Fax: 
Ap
plicant’s Representative:  
Complete Address:  
Daytime Phone:  Evening Phone:      Fax: 
**
*****************************PLEASE ATTACH ADDITIONAL SHEET IF NECESSARY************************************** 
Project Name and Brief Description (i.e. residential, agricultural, commercial, number of lots, etc.):  
 
 
Is any portion of the property located within 500 feet of an adjoining municipality?  
Wetlands Located on Property (in square feet (sq. ft.)):   Wetlands to be impacted (sq. ft.):  
Watercourses Located on Property?  Name or Type of Watercourse:  
Are Proposed Activities Located within the 100-Year Floodplain?   Floodway?  
Are there slopes with grades in excess of 15% located on the property?  
Do Proposed Activities Require Review by the PZC?  
    *********SEE APPLICATION CHECKLIST ON BACK for MINIMUM APPLICATION REQUIREMENTS********** 
The applicant understands that this application is to be considered complete only when all information and documents required by 
the Commission have been submitted. The undersigned warrants the truth of all statements contained herein and in all supporting 
documents according to the best of his/her knowledge and belief. Permission is granted to the Town of Granby, Inland Wetlands & 
Watercourses Commission, and its agent (s) to inspect the subject land, at reasonable times, during the pendency of an application 
and for the life of the permit. 
Applicant’s Signature:  Date:  
       Owner’s Signature:  Date:  
FO
R OFFICE USE 
   Application #: Date Submitted: 
   Fee amt./Check or Cash: Date of Receipt: 
   Agent Ruling: Date Approved/Denied: 
Se
e Reverse Side for Conditions of Approval or Reason for Denial 
37 Hartford Avenue (Hartford Avenue - Shattuck Avenue)
111,198 SF COCE 4254 Vacant
129 Lovers Lane, Granville, MA 01034
(413) 478-9691 (413) 478-9691
forrestdevine7@gmail.com
Howland Partners, LLC c/o Arthur Howland, Manager
39 Brown Road, South Kent, CT 06785
R Levesque Associates, Inc.
40 School Street, Westfield, MA 01085
(413) 568-0985 (413) 568-0985
No
The applicant
proposes the construction of a multifamily residential development with associated site improvements, including
parking, utilities, landscaping, lighting, site grading, and stormwater management.
Yes
Forrest Devine
1,116
0
No
Salmon Brook (off-site)
No
No
No

Page 71

Granby Inland Wetlands and Watercourses Commission Application Checklist 
N/A  Appl.                                                                          Documents Required 
     Applications and revised materials must be submitted to the Office of Community Development no later than 5 pm eight (8)  
             days prior to the IWWC meeting to be fully reviewed by the IWWC, otherwise applications may only be received.  
     An original of the completed application form and site plan and two (2) full size copies of the set of site plans and any reports. 
     Seven (7) 11X17 (or full size) sets copies of site plans and complete application, including one (1) complete digital copy of  
             submission. 
     Application Fee (see following page for calculation) 
     Pre and post development stormwater drainage calculations, with drainage area map, except for single-family homes, etc.  
     Report on soil types and characteristics from Professional Soil Scientist who delineated wetlands. Report shall include a  
             minimum of one field soil profile for each wetland soil type within project area. Profile shall be presented in data sheet format. 
     The applicant must certify whether any portion of the property is within 500 feet of an adjoining municipality, whether streets  
             from an adjoining municipality will be used for entering or exiting the site, whether sewer or water drainage will flow through or  
             impact an adjoining municipality or whether water run-off will impact streets or adjoining municipal or private property within an  
             adjoining municipality. If the project falls within any of the above mentioned definitions, then a letter must be sent by certified   
             mail to the adjoining municipalities Inland Wetlands Agency along with a copy of the application and site plan being submitted to   
             this Commission. Evidence of submission shall be submitted to the Granby IWWC. 
     For proposed wetland impacts, a wetland assessment report from a soil scientist or other qualified individual. Mitigation  
              activities shall also be described.  
N/A  Appl.                                                                     Site Plan Requirements 
     Stamped by a Professional Engineer registered in the State of Connecticut.  
     Property boundaries, north arrow, name of project, date and type of drawing, subsequent dates of revision with description,  
             names and addresses of engineers and surveyors (when appropriate), location map, property owners(s) and adjacent property  
             owners. 
     Existing and proposed topography, structures, utilities, roadways and buildings. Plan/profile sheets shall be included for roads  
             and all off road pipelines. 
     Soil types as mapped by the National Resource Conservation Service. 
     Wetlands or watercourses located on adjacent properties when proposed activities may be located in the Upland Review Area. 
     Alternatives considered and rejected to be either shown on a site plan or explained in narrative form. 
     Soil and Erosion Control Measures including Narrative, per 2002 CT E&S Control Guidelines at a minimum. 
     Wetland boundaries delineated by a Professional Soil Scientist whose signatures is required on site plan.  
     Limits of Upland Review Areas. 
     Cuts and fill volumes indicating source and type of fill, destination of removed fill, except for single-family homes or similar. 
     Limits of woody vegetation clearing. 
     Well locations and setbacks from septic systems and drainage swales. 
     Septic system locations including reserve areas, existing and proposed grading, spot grades and setbacks from wetland areas. 
     Stormwater drainage systems. 
     All existing and proposed pipe sizes, lengths and inverts. 
     Test pit and soil profile locations. 
     Acreages of wetlands/watercourses on the site and the acreages presented separately of wetlands, watercourses or upland  
             review areas to be altered. 
     Boundaries of 100-year floodplain or floodways as determined by FEMA.  
     Erosion and sediment control details along with a sequence plan. 
     Test pit logs 
     Details of all proposed site improvements (i.e. drainage structures, pipes, footing drains, curtain drains, dewatering, cross section  
             of septic system or sewer connection, cross section of detention, retention, or sediment basins, etc.) 
     Construction sequence specifications. 
N/A  Appl.                                                                       Public Hearing (If Required) 
     The Town of Granby Office of Community Development is responsible for publishing the legal notice.  
THE GRANBY IWWC MAY REQUEST ADDITIONAL INFORMATION DURING THE PERMIT PROCESS AS NECESSARY. 
 
 
 
 
 
 
  

Page 72

 41
 SECTION 19 
FEES 
 
19.5 Fee Schedule.  Application fees shall be based on the following schedule. 
  
       ACTIVITY FEE/ AREA / # APPLIED 
 
  State of Connecticut Land Use Fee $60.00 $ 60.00           + 
  Permitted Uses As-of-Right & Non-Regulated Uses None     None  
 
  CATEGORY 1 - RESIDENTIAL/SINGLE-FAMILY RESIDENCES (INCLUDING 2-LOT SUBDIVISIONS) 
I. Base Fee 
a. General Application  $150.00 + II $ + 
b. Accessory to Existing Primary Structure   $80.00 + II $ + 
c. Modification to Existing Approval   $30.00 + II $ + 
II. Activity Fee 
a. $100.00 per Watercourse Crossing _________ (#) $ + 
b. $0.02 per sq. ft. of Wetland Disturbance  SF       $ + 
      Within Upland Review Area… 
c. $100.00 per Structure (greater than 200 sq. ft.) _________(#) $ +  
d. $0.01 per sq. ft. of Impervious Surface _________SF $ + 
e. $250.00 per Stormwater Management Basin  _________ (#) $ + 
f. $100.00 per Storm Drain Outfall _________ (#) $ + 
g. $0.01 per sq. ft. of Steep Slope Disturbance _________SF $ + 
       (Slopes Greater than 2:1 – Define Area on Plan) 
h. $0.005 per sq. ft. of Woody Vegetation Clear-Cut _________SF $ + 
 
 TOTAL FEE – CATEGORY 1  $  
 
  CATEGORY 2 - SUBDIVISIONS (GREATER THAN 2-LOTS)/CONDOMINIUMS, MULTI-FAMILY UNITS/COMMERCIAL 
I. Base Fee 
a. General Application Per Primary Structure (up to 5)   $300.00/(+II) $ + 
i. Fee Per Each Primary Structure Beyond 5   $20.00 (+II) $ + 
b. Accessory to Existing Primary Structure $150.00 (+II) $ + 
c. Modification to Existing Approval   $60.00 (+II) $ + 
II. Activity Fee* 
a. $200.00 per Watercourse Crossing  _________ (#) $ + 
b. $0.04 per sq. ft. of Wetland Disturbance  SF      $ + 
      Within Upland Review Area… 
c. $100.00 per Structure  _________(#) $ +  
d. $0.02 per sq. ft. of Impervious Surface _________SF $ + 
e. $250.00 per Stormwater Management Basin  _________ (#) $ + 
f. $100.00 per Storm Drain Outfall _________ (#) $ + 
g. $0.02 per sq. ft. of Steep Slope Disturbance _________SF $ + 
                (Slopes Greater than 2:1 – Defined Area on Plan) 
h. $0.01 per sq. ft. of Woody Vegetation Clear-Cut _________SF $ + 
 
 TOTAL FEE – CATEGORY 2  $  
0.00
300.00
N/A
N/A
1
6,760
135.20
0
0
0
0
435.20

Page 73

 42
 
  
       ACTIVITY FEE/ AREA / # APPLIED 
 
  CATEGORY 3 – ALL OTHER APPLICATIONS 
I. Base Fee 
a. General Application $200.00 (+II) $ + 
b. Modification to Existing Approval   $60.00 (+II) $ + 
II. Activity Fee* 
a. $200.00 per Watercourse Crossing _________(#) $ + 
b. $0.04 per sq. ft. of Wetland Disturbance  SF   $ + 
      Within Upland Review Area… 
c. $100.00 per Structure  _________(#) $ +  
d. $0.02 per sq. ft. of Impervious Surface _________SF $ + 
e. $250.00 per Stormwater Management Basin _________(#) $ + 
f. $100.00 per Storm Drain Outfall _________(#) $ + 
g. $0.02 per sq. ft. of Steep Slope Disturbance _________SF $ + 
                (Slopes Greater than 2:1 – Defined Area on Plan) 
h. $0.01 per sq. ft. of Woody Vegetation Clear-Cut _________SF $ + 
 
 TOTAL FEE – CATEGORY 3  $  
 
III. Significant Activity Fee $300.00      $ + 
IV. Permit Extension Fee 
a. Residential Uses   $40.00      $ + 
b. Commercial/Industrial/Other Uses   $80.00      $ + 
V. Map and Regulation Amendments $250.00       $ + 
 
 APPLICATION FEE SUBTOTAL  $                    + 
 
VI. Post Activity Application Fee               20% of Fee Subtotal $                    + 
 
 TOTAL APPLICATION FEE:     $  
 
Boards, Commissions, Agencies and Departments of the Town of Granby are exempt from all fee requirements. 
 
VII. Complex Application Fee – Section 22a-42a of the Connecticut General Statutes states that an 
applicant shall pay a fee equal to the Town’s expenditures in hiring outside consultants and 
experts to analyze, review and report on issues requiring such experts. Such fee may include, 
but not be limited to, the cost of retaining experts to analyze, review, and report on issues 
requiring such experts. The Commission or the duly authorized agent shall estimate the 
complex application fee which shall be paid pursuant to section 19.1 of these regulations 
within 10 days of the applicant’s receipt or notice of such estimate. Any portion of the complex 
application fee in excess of the actual cost shall be refunded to the applicant no later than 30 
days after publication of the Commission’s decision. 
0.00
495.20
N/A
495.20

Page 74

1       rev. 12/2016 pdf
79 Elm Street • Hartford, CT 06106-5127   www.ct.gov/deep          Affirmative Action/Equal Opportunity Employer 
 
STATEWIDE INLAND WETLANDS & WATERCOURSES 
ACTIVITY REPORTING FORM 
Pursuant to section 22a-39(m) of the General Statutes of Connecticut and section 22a-39-14 of the 
Regulations of Connecticut State Agencies, inland wetlands agencies must complete the Statewide 
Inland Wetlands & Watercourses Activity Reporting Form for each action taken by such agency.   
This form may be made part of a municipality's inland wetlands application package.  If the municipality 
chooses to do this, it is recommended that a copy of the Town and Quadrangle Index of Connecticut 
and a copy of the municipality's subregional drainage basin map be included in the package.   
Please remember, the inland wetlands agency is responsible for ensuring that the information provided 
is accurate and that it reflects the final action of the agency.  Incomplete or incomprehensible forms will 
be mailed back to the agency.  Instructions for completing the form are located on the following pages. 
The inland wetlands agency shall mail completed forms for actions taken during a calendar month no 
later than the 15th day of the following month to the Department of Energy and Environmental 
Protection (DE
EP).  Do not mail this cover page or the instruction pages.  Please mail only the 
completed reporting form to: 
DEEP Land & Water Resources Division 
Inland Wetlands Management Program 
79 Elm Street, 3rd Floor 
Hartford, CT  06106 
Questions may be directed to the DEEP's Inland Wetlands Management Program at (860) 424-3019.  

Page 75

2       rev. 12/2016 pdf
INSTRUCTIONS FOR COMPLETING  
THE STATEWIDE INLAND WETLANDS & WATERCOURSES ACTIVITY REPORTING FORM 
Use a separate form to report EACH action taken by the Agency.   Complete the form as described below.  
Do NOT submit a reporting form for withdrawn actions.  
PART I:  Must Be Completed By The Inland Wetlands Agency 
1. Choose the year and month the Inland 
Wetlands Agency took the action being reported. If multiple actions were taken
regarding the same project or activity then multiple forms need to be completed.
2.Choose ONE code letter to describe the final action or decision taken by the Inland Wetlands Agency.  Do NOT submit 
a reporting form for withdrawn actions.  Do NOT enter multiple code letters (for example: if an enforcement notice was 
given and subsequent permit issued - two forms for the two separate actions are to be completed).
A  =  A Permit Granted by the Inland W
etlands Agency (not including map amendments, see code D below) 
B =  Any Permit Denied by the Inland Wetlands Agency 
C  =  A Permit Renewed or Amended by the Inland Wetlands Agency 
D  =  A Map Amendment to the Official Town Wetlands Map    - or -   
 An Approved/Permitted Wetland or Watercourse Boundary Amendment to a Project Site Map  
E  = 
 An Enforcement Action:  Permit Revocation, Citation, Notice of Violation, Order, Court Injunction, or Court Fines 
F  =  A Jurisdictional Ruling by the Inland Wetlands Agency  (i.e.: activities "permitted as of right" or activities 
 consider
ed non-regulated) 
G  =  An Agent Approval pursuant to CGS 22a-42a(c)(2) 
H  =  An Appeal of Agent Approval Pursuant to 22a-42a(c)(2) 
3.Check "yes" if a public hearing was held in regards to the action taken; otherwise check "no".
4. Enter the name of the Inland Wetlands
 Agency official verifying that the information provided on this form is accurate
and that it reflects the FINAL action of the agency.
PART II: To Be Completed By The Inland Wetlands Agency Or The Applicant   -  If Part II is completed by the 
applicant, the applicant MUST return the form to the Inland Wetlands Agency. The Inland Wetlands Agency MUST ensure 
that the information provided is accurate and that it reflects the FINAL action of the Agency.  
5. Enter the name of the municipality for w
hich the Inland Wetlands Agency has jurisdiction and in which the
action/project/activity is occurring.
Check "yes" if the action/project/activity crosses municipal boundaries and enter the name(s) of the other
municipality(ies) where indicated.  Check "no" if it does
 not cross municipal boundaries.
6. Enter the USGS Quad Map name or number
 (1 through 115) as found on the Connecticut Town and Quadrangle Index
Map (the directory to all USGS Quad Maps) that contains the location of the action/project/activity. Click on the
following website for USGS Quad Map information:
http://ct.gov/deep/lib/deep/gis/resources/Index_NamedQuadTown.pdf
ALSO enter the four-digit identific
ation number of the corresponding Subregional Drainage Basin in which the
action/project/activity is located.  If the action/project/activity is located in more than one subregional drainage basin,
enter the number of the basin in which the majority of the action/project/activity is located.  Town subregional drainage
basin maps can be found at UConn – CLEAR’s website:  http://clear.uconn.edu/data/map_set/index.htm
7. Enter the name of the individual apply
ing for, petitioning, or receiving the action.
8.Enter the name and address or location of the action/project/activity.  Check if the action/project/activity is
TEMPORARY or PERMANENT in nature.  Also provide a brief DESCRIPTION of the action/project/activity.  It is
always best to provide as much information as possible (i.e., don't just 
state "forestry", provide  details such as "20
acre forestry 
harvest, permit required for stream crossing".)

Page 76

3       rev. 12/2016 pdf
9.Carefully review the list below and enter ONLY ONE code letter which best characterizes the action/project/activity.  All
state agency projects must code "N".
A = Residenti
al Improvement by Homeowner  I = Storm Water / Flood Control  
B = New Residential Development for Single Family Units J = Erosion / Sedimentation Control 
C = New Residential Development for Multi-Family / Condos K = Recreation / Boating / Navigation 
D = Commercial / Industrial Uses L = Routine Maintenance 
E = Municipal Project        M = Map Amendment 
F = Utility Company Project     N = State Agency Project   
G = Agriculture, Forestry or Conservation P = Other (this code includes the approval of 
H = Wetland Restoration, Enhancement, Creation        concept plans with no-on-the-ground work) 
10. Enter between
 one and four code numbers to best characterize the project or activity being reported. Enter "NA" if this
form is being completed for the action of map amendment.  You MUST provide code 12 if the activity is located in an
established upland review area. You MUST provide code 14 if the activity is located beyond the established upland
review area or no established upland review area exists.
1 = Filling 8 = Underground Utilities Only (no other activities) 
2 = Excav
ation 9 = Roadway / Driveway Construction 
3 = Land Clearing / Grubbing (no other activity) 10 = Drainage Improvements 
4 = Stream Channelization 11 = Pond, Lake Dredging / Dam Construction 
5 = Stream Stabilization (includes lakeshore stabilization) 12 = Activity in an Established Upland Review 
6 = Stream Clearance (removal of debris only)        Area  
7 = Culverting (not for roadways) 14 = Activity in Upland 
Examples:  Jur
isdictional ruling allowing construction of a parking lot in an upland where the municipality does not have an 
established upland review area must use code 14, other possible codes are 2 and 10.  Permitted construction of a free standing 
garage (residential improvement by homeowner) partially in an established upland review area with the remainder in the upland 
must use code 12 and 14, other possible codes are 1 and 2.   
11. Leave blank f
or TEMPORARY alterations but please indicate action/project/activity is temporary under question #8 on
the form.  For PERMANENT alterations, enter in acres the area of wetland soils or watercourses altered. Include areas
that are permanently altered, or are proposed to be, for all agency permits, denials, amendments, renewals,
jurisdictional rulings, and enforcement actions. For those activities that involve filling or dredging of lakes, ponds or
similar open water bodies enter the acres filled or dredged under "open water body". For those activities that involve
directly altering a linear reach of a brook, river, lakeshore or similar linear watercourse, enter the total linear feet altered
under "stream".  Remember that these figures represent only the acreage altered not the total acreage of wetlands or
watercourses on the site. You MUST provide all information in ACRES (or linear feet as indicated) including those
areas less than one acre. To convert from square feet to acres, divide square feet by the number 43,560.  If this report
is being completed for an agency jurisdictional ruling and detailed information is not available, provide an estimate.
Enter zero if there is no alteration.
12. Enter in ac
res the area of upland altered as a result of an ACTIVITY REGULATED BY the inland wetlands agency, or
as a result of an AGENT APPROVAL pursuant to CGS section 22a-42a(c)(2).  Leave blank for TEMPORARY
alterations but please indicate action/project/activity is temporary under question #8 on the form.  Include areas that are
permanently altered, or proposed to be permanently altered, for all agent approvals, agency permits, denials,
amendments, renewals, jurisdictional rulings, and enforcement actions.  You MUST provide all information in ACRES
including those areas less than one acre.  See directions above (#11) for conversion factor.  If this report is being
completed for an agent approval or an agency jurisdictional ruling and detailed information is not available, provide an
estimate.  Enter zero if there is no alteration.
13. Enter the ac
res that are, or are proposed to be, restored, enhanced or created for all agency permits, denials,
amendments, renewals, jurisdictional rulings and enforcement actions. NOTE restored or enhanced applies to
previously existing wetlands or watercourses.  Created applies to a non-wetland or non-watercourse area which is
converted into wetlands or watercourses (question #10 must provide 12 and/or 14 as an answer, and question #12
must also be answered).  You MUST provide all information in ACRES including those areas less than one acre.  See
directions above (#11) for conversion factor.  Enter zero if there is no restoration, enhancement or creation.
PART III:  To Be Completed By The DEEP  -  Please leave this area blank.  Incomplete or incomprehensible forms 
will be mailed back to the inland wetlands agency. 

Page 77

rev. 12/2016 pdf 
79 Elm Street • Hartford, CT 06106-5127   www.ct.gov/deep          Affirmative Action/Equal Opportunity Employer 
Statewide Inland Wetlands & Watercourses Activity Reporting Form 
Please complete and mail this form in accordance with the instructions on pages 2 and 3 to: 
DEEP Land & Water Resources Division, Inland Wetlands Management Program, 79 Elm Street, 3rd Floor, Hartford, CT 06106 
Incomplete or incomprehensible forms will be mailed back to the inland wetlands agency.  
PART I:   Must Be Completed By The Inland Wetlands Agency 
1.DATE ACTION WAS TAKEN:       year:  ______________ month:  ______________
2.ACTION TAKEN (see instructions, only use one code):   ______________
3.WAS A PUBLIC HEARING HELD (check one)?     yes  no  
4. NAME OF AGENCY OFFICIAL VERIFYING AND COMPLETING THIS FORM:
(print name) (signature)    ________________________________________________ 
PART II:  To Be Completed By The Inland Wetlands Agency Or The Applicant 
5. TOWN IN WHICH THE ACTION IS OCCURRING (print name):  ______________________________________________________
does this project cross municipal boundaries (check one)?     
  yes  no
if yes, list the other town(s) in which the action 
is occurring (print name(s)):   ____________________,  ______________________
6. LOCATION (see instructions for information):   USGS quad name:  _____________________________   or number:  __________
subregional drainage basin number:  _______________________
7. NAME OF APPLICANT, VIOLATOR OR PETITIONER (print name):  __________________________________________________
8.
9.ACTIVITY PURPOSE CODE (see instructions, only use one code):    ___________
10.ACTIVITY TYPE CODE(S) (see instructions for codes):    __________,    __________,    __________,    __________
11.WETLAND / WATERCOURSE AREA ALTERED (must provide acres or linear feet):
12.UPLAND AREA ALTERED (must provide acres):   ____________ acres
13.AREA OF WETLANDS / WATERCOURSES RESTORED, ENHANCED OR CREATED (must provide acres):    ____________ acres
 DATE RECEIVED:   PART III:  To Be Completed By The DEEP   DATE RETURNED TO DEEP: 
 FORM COMPLETED:   YES    NO    FORM CORRECTED / COMPLETED:   YES   NO 
GIS CODE #:  ____   ____   ____   ____   ____   ____   ____   ____   ____ 
For DEEP Use Only 
NAME & ADDRESS / LOCATION OF PROJECT SITE (print information):  _______________________________________________
briefly describe the action/project/activity (check and print information):  temporary         permanent          description: ____________
_______________________________________________________________________________________________________________________
wetlands:   ____________ acres     open water body:   ____________ acres                stream:   ____________ linear feet
Granby
37 Hartford Avenue, Granby, CT
Proposed Residential Development
C
12
0
0
0
0
Forrest Devine
0.33

Page 78

 
 
 
3.    PROJECT NARRATIVE 

Page 79

Page | 1 
 
PROJECT NARRATIVE 
 
For 
 
37 HARTFORD AVENUE 
GRANBY, CONNECTICUT 06035 
(PARCEL ID: 4254) 
 
INTRODUCTION 
 
On behalf of the applicant, Forrest Devine, R Levesque Associates, Inc. (RLA) is providing 
this project narrative as a supplement to the Application for Inland Wetlands & 
Watercourses Activity. The applicant proposes the construction of a multifamily residential 
development with associated site improvements within the 100’ Upland Review Area to a 
Wetland and 200’ Upland Review Area to a Watercourse (tributary to Salmon Brook). 
 
PROPERTY DESCRIPTION 
 
The subject property is located southwest of Hartford Avenue and consists of approximately 
111,198 ± SF as shown on the associated site plan as prepared by R Levesque Associates, 
Inc. The property is owned by Howland Partners, LLC and is recorded in the Granby Town 
Clerks Records under Volume 349, Page 667.  
 
EXISTING CONDITIONS & TOPOGRAPHY 
 
The subject property is partially developed with an existing building foundation, impervious 
parking area and associated paved driveway, and yard area . The topography of the site 
generally varies, sloping from the  north to the south  towards wetlands within the rear of 
the property. A Topographic Map is included within  this application packet under Section 
4, as Figure 1. 
 
ENVIRONMENTAL FACTORS 
 
The subject property is not located within a Special Flood Zone Area according to Flood 
Insurance Rate Map (FIRM) Number 09003C0183F effective dated September 26, 2008. 
 
A review of CT ECO mapping showed the subject property is not located within a Natural 
Diversity Area. 
 
 

Page 80

Page | 2 
 
PROPOSED PROJECT DESCRIPTION 
 
The applicant proposes the construction of a residential development with associated site 
improvements. Associated site improvements include, but are not limited to, parking, 
utilities, stormwater management, site grading, landscaping, and lighting. 
 
The proposed project work will proceed in the following general construction sequence:  
 
1. Install perimeter erosion and sedimentation controls in accordance with the 
approved plans; 
2. Clear and grub limits of disturbance; 
3. Establish construction entrance; 
4. Perform rough grading to establish subgrades for building and drainage system; 
5. Install and construct underground utilities, including septic system; 
6. Construct stormwater management system; 
7. Construct a three-story multifamily residential building; 
8. Install curbing, sidewalks, and pavement for entry way and parking area; 
9.  Complete final grading, place topsoil, and site stabilization; and 
10.  Remove temporary erosion and sedimentation controls after site stabilization is 
achieved and Town of Granby sign-off is received. 
 
SOILS & EROSION CONTROL MEASURES 
 
According to the NRCS Web Soil Survey, the soil types mapped within the subject property 
consist of: Agawam fine sandy loam, 0 to 3 percent slopes (29A), Hinckley loamy sand, 
15 to 45 percent slopes (38E), and Saco silt loam, 0 to 2 percent slopes (108). Please refer 
to the attached NRCS Web Soil Survey Map, which is included within this application 
packet, under Section 4, as Figure 3. 
 
A siltation fence is proposed downslope of the proposed residential addition to intercept 
and contain sediment generated during construction, providing protection for the  brook 
and its surrounding resource areas. The fence will follow the natural contours where 
feasible and will be keyed into the ground to prevent bypassing. All materials and 
installation methods will meet standard erosion control practices to ensure effective 
filtration during soil disturbance activities. The fence will be fully in place and available for 
inspection by the IWWA  before any construction work begins.  Said fencing will remain in 
place until removal is directed by the IWWA. 
 
 

Page 81

Page | 3 
 
WETLAND RESOURCE AREAS 
 
Wetland resource areas were delineated by Ryan Nelson, Registered Soil Scientist (SSSSNE) 
in March of 2026. Please refer to Section 4 of this application packet for a detailed wetland 
scientist report. 
 
Please note that resource area flags shown off-site are shown for reference purposes only 
and the determination of such is not the subject of this filing. 
 
Tributary to “Salmon Brook” 
 
The northern Bank of a stream tributary to Salmon Brook was delineated and is shown on 
the associated filing plans with flagging labeled “BNK -100” through “BNK -145”. No 
disturbance to Bank is proposed as part of this filing. 
 
200’ Upland Review Area from Watercourse 
 
The 200’ Upland Review Area is shown offset 200’ from the Bank flags . Proposed work 
within the 200’ Upland Review Area consists of portions of the proposed parking area, the 
pavilion, dumpster enclosure, and associated site grading activities. Certain components 
of the proposed drainage system, such as catch basins and associated pipe network,  are 
also located within the Upland Review Area. However, the proposed building, subsurface 
stormwater system, and associated utility connections are located outside of the Upland 
Review Area. 
 
200’ Upland Review Area 
(On-Site Total) 17,352 SF 
200’ Upland Review Area 
(Proposed Disturbance) 10,145 SF 
 
Wetland 
 
An inland wetland was delineated and is shown on the associated filing plans with flagging 
labeled “A-1” through “A-22”.  No disturbance to the wetland is proposed as part of this 
filing. 
 
 
 
 

Page 82

Page | 4 
 
100’ Upland Review Area from Wetland 
 
The 100’ Upland Review Area is shown offset 100’ from the boundary of the delineated 
wetland. Proposed work within the 100’ Upland Review Area is limited in scope and 
consists only of minor encroachment of portions of the proposed parking area and 
associated site grading. No structures are proposed within this buffer, and impacts are 
generally confined to grading transitions and surface improvements tied to the parking 
layout. All remaining site elements are located outside of the 100’ Upland Review Area. 
 
100’ Upland Review Area 
(On-Site Total) 54,291 SF 
100’ Upland Review Area 
(Proposed Disturbance) 4,642 SF 
 
ALTERNATIVE ANALYSIS 
 
Alternative #1 – Keeping all disturbance outside the Upland Review Area  
 
An alternative that maintains all disturbance outside the  Upland Review Area  was 
evaluated; however, this approach is not practicable given the existing site constraints and 
development history. The previously disturbed limits extend into the upland review area, 
and avoiding this area entirely would require shifting or reducing th e project beyond the 
already degraded footprint. Such reconfiguration would result in inefficient site layout, 
potential impacts to previously undisturbed upland areas, and challen ges in 
accommodating required access, utilities, and stormwater management infrastructure. The 
proposed design instead concentrates redevelopment within the same general existing 
disturbed footprint, minimizing expansion and avoiding encroachment into more sensitive, 
undisturbed areas. As a result, the project represents a balanced approach that limits 
environmental impact while allowing reasonable use of the property. 
 
Alternative #2 – No Build 
 
The no-build alternative would avoid any additional disturbance to the site; however, it 
would leave the property in its current degraded and unmanaged condition. The site has 
remained vacant following prior clearing, grading, and partial construction, resulting in an 
area that lacks stabilization, formal stormwater management, and ecological function. 
Under a no -build scenario, these conditions would persist, with no improvements to 
drainage, water quality, or site restoration. In contrast, the proposed multifamily 
development includes comprehensive site improvements such as stormwater management 

Page 83

Page | 5 
 
systems, controlled grading, and landscaping, which will enhance site stability and 
environmental performance. Accordingly, the proposed project provides a net benefit 
compared to the no -build alternative by improving existing degraded conditions while 
limiting disturbance to previously impacted areas. 
 
Based on the two alternatives , both are either impractical or fail to improve existing site 
conditions. The proposed addition represents the most feasible and environmentally 
responsible option, limiting disturbance while allowing for the introduction of  erosion 
controls and site restoration. 
 
CRITERIA FOR DECISION 
 
The following text is taken directly from the Town of Granby IWWA Regulations Section 
10.2 and is presented below in italic text, followed by an RLA Response presented below 
in boldface text. 
 
A. The environmental impact of the proposed regulated activity on wetlands or 
watercourses;  
 
RLA Response: The proposed project has been designed to avoid direct impacts to 
wetlands and watercourses, with all site improvements located outside of delineated 
resource areas. Work within the upland review area is limited and does not include 
permanent structures . Erosion and sedimentation controls will be implemented 
during construction to prevent off-site transport of sediments. 
 
B. The applicant’s purpose for, and any feasible and prudent alternatives to, the 
proposed regulated activity which alternatives would cause less or no environmental 
impact to wetlands or watercourses;  
 
RLA Response: The purpose of the project is to develop a multifamily residential 
building with associated site improvements on a previously disturbed and vacant 
property. Alternatives that would entirely avoid the upland review area or reduce 
the project footprint were considered but found to be impracticable due to the extent 
of existing disturbance and site constraints. 
 
C. The relationship between the short -term and long -term impacts of the proposed 
regulated activity on wetlands or watercourses and the maintenance and 
enhancement of long-term productivity of such wetlands or watercourses;  
 

Page 84

Page | 6 
 
RLA Response: Short-term impacts are limited to typical construction -related 
disturbances such as earthwork and utility installation within previously disturbed 
areas, which will be managed through erosion and sedimentation controls. Long -
term conditions are expected to  improve relative to existing site conditions, which 
currently lack formal stormwater management and stabilization. The project 
includes permanent stormwater treatment measures, controlled grading, and 
vegetative stabilization, which will red uce pollutant loading and improve runoff 
characteristics.  
 
D. Irreversible and irretrievable loss of wetland or watercourse resources which would 
be caused by the proposed regulated activity, including the extent to which such 
activity would foreclose a future ability to protect, enhance or restore such resources, 
and any mitigation measures which may be considered as a condition of issuing a 
permit for such activity including, but not limited to, measures to (1) prevent or 
minimize pollution or other environmental damage, (2) maintain or enhance 
existing environmenta l quality, or (3) in the following order of priority: restore, 
enhance and create productive wetland or watercourse resources;  
 
RLA Response: No irreversible or irretrievable loss of wetlands or watercourses is 
proposed, as no direct alteration or filling of these resources will occur. The project 
has been designed to avoid encroachment into delineated wetland boundaries and 
to confine activity. Mitigation measures include the installation and maintenance of 
erosion and sedimentation controls during construction, implementation of 
stormwater management systems to treat and attenuate runoff, and restoration of 
disturbed areas with topsoil and vegetation.  
 
E. The character and degree of injury to, or interference with safety, health or the 
reasonable use of property which is caused or threatened by the proposed 
regulated activity;  
 
RLA Response: The proposed regulated activity is not anticipated to result in injury 
to public safety, health, or the reasonable use of surrounding properties. The 
development includes an engineered stormwater management system designed to 
control runoff and prevent flooding or erosion impacts to adjacent properties. 
Improvements to site grading and drainage will enhance existing conditions, which 
are currently unmanaged due to the site’s vacant and disturbed state.  
 
F. Impacts of the proposed regulated activity on wetlands or watercourses outside the 
area for which the activity is proposed and future activities  associated with or 

Page 85

Page | 7 
 
reasonably related to, the proposed regulated activity which are made inevitable by 
the proposed regulated activity and which  may have an impact on wetlands and 
watercourses. 
 
RLA Response: The proposed activity is not expected to result in impacts to wetlands 
or watercourses beyond the project area. Construction controls and permanent 
stormwater management measures are designed to prevent sedimentation, erosion, 
and pollutant transport to of f-site resources. The project represents a standalone 
redevelopment of a previously disturbed property and does not induce or 
necessitate additional future activities that would impact wetlands or watercourses. 
Any future site modifications would be subject to separate review and permitting, as 
applicable.  
 
CONCLUSION 
 
The proposed multifamily residential development has been carefully designed to avoid 
direct impacts to wetlands and watercourses while minimizing work within the upland 
review area. The project is mostly confined to a previously degraded portion of the site. 
Implementation of erosion and sedimentation controls, along with permanent stormwater 
management measures, will ensure protection of adjacent resource areas during both 
construction and long-term operation. Compared to existing unmanaged conditions, th e 
project is expected to provide improved site stabilization and water quality treatment. T he 
proposed activity is consistent with applicable regulatory criteria and will not result in 
significant adverse environmental impacts.  Based on the foregoing, the applicant 
respectfully requests approval from the IWWA. 
 
[ END OF PROJECT NARRATIVE ] 

Page 86

 
 
 
4. WETLAND SCIENTIST / SOIL REPORT 
 

Page 87

R LEVESQUE ASSOCIATES, INC. 
40 School Street, P.O. BOX 640, Westfield, MA 01085 
p 413.568.0985  ·  f 413.568.0986  ·  www.rlaland.com 
 
1 
 
May 27, 2026 
 
John L. Laudati, Chairman 
Town of Granby Inland Wetlands & Watercourses Commission  
15 North Granby Road  
Granby, Connecticut 06035 
 
RE:  Wetland Scientist Report 
37 Hartford Avenue, Granby, Connecticut 06035  
(Parcel ID: 4254) 
RLA Project File No. 251219 
 
Dear Chairman Laudati,  
 
On March 26, 2026, I conducted an inspection of the above referenced property to delineate inland 
wetland soils and/or watercourses within a jurisdictional vicinity to the project site. Using a hand soil 
auger, I observed soil profiles to a depth of approximately 2 to 3 feet. The property contains an existing 
concrete building foundation with various drainage and utility site improvements resulting from a 
previous unfinished project. The applicant proposes the construction of a multifamily residential 
development with associated site improvements, portions of which are proposed within the 100’ Upland 
Review Area to a Wetland and 200’ Upland Review Area to a Watercourse (tributary to West Branch 
Salmon Brook). 
 
Findings 
 
Wetland Resource Areas 
Based on guidelines established by the National Cooperative Soil Survey and as defined by Connecticut 
Public Act 72-155, as amended by CT P.A. 73-571, CT P.A. 87-338, CT P.A. 87-533, I delineated a 
forested inland wetland located proximate to, and mostly south of, the southerly property line. Please 
note that offsite wetland resource areas have been delineated to accurately project upland review area 
jurisdiction onto the subject property, and the determination of off-site wetland resource areas owned by 
others is not the subject of this filing. The northerly boundary of the forested wetland has been delineated 
with pink flagging labeled “A1” through “A22”. The wetland border follows the edge of an existing 
gravel/dirt path that appears to have been constructed many decades ago. All of the wetland areas are 
classified as a forested wetland general classification. This wetland area has functions that include: 
groundwater recharge and discharge, sediment stabilization, nutrient removal and transformation, 
product export, and wildlife diversity and habitat. The vegetative over-story includes maples, ash, black 
cherry, and poplar. Shrub species include winterberry, spice bush, and dogwood. The herbaceous layer  

Page 88

R LEVESQUE ASSOCIATES, INC. 
40 School Street, P.O. BOX 640, Westfield, MA 01085 
p 413.568.0985  ·  f 413.568.0986  ·  www.rlaland.com 
 
2 
 
 
 
includes sensitive fern, poison ivy, fox grape, jack in the pulpit and skunk cabbage. The wetland area  
has a diverse native vegetation population at the herbaceous, shrub and tree layers. No evidence of 
invasive species was observed. It is anticipated that wildlife utilizes this wetland corridor as a source of 
food, water, and shelter. 
An unnamed stream was also observed within said forested wetland. Said stream appears to be a 
tributary to West Branch Salmon Brook. The northerly top of bank of the stream has been delineated with 
blue flags labeled “BNK-100” through “BNK-145”. The stream is located off-site but has been shown to 
accurately project a 200’ Watercourse Upland Review Area onto the subject property.  
 
Soils 
The upland area is comprised of a Hinckley loamy sand (38E), 15 to 45 percent slopes, that transitions 
to a Saco silt loam (108), frequently ponded, 0 to 2 percent slopes near the wetland. Saco silt loam is 
classified as a very poorly drained soil. These soils are formed in alluvial stratified sand and silt loams. 
These soils are on low flood plains along stream and rivers and are frequently flooded.  
 
Upland Area 
The upland review area consists of gravel and mixed vegetated surfaces with stormwater drainage 
structures installed from a prior project. The proposed project is not proposed to alter the wetland or 
stream, but is located within the upland review area. It is anticipated that the proposed project will occur 
generally within the limits of disturbance from previous projects, and the wetland resource areas will 
continue to function undisturbed.  
 
Recommendations 
With adequate erosion and sedimentation controls implemented during construction, and 
implementation of a stormwater management design, it is anticipated that the proposed development 
will not have a significant adverse impact on the adjacent inland wetlands and/or watercourses. If you 
have any questions regarding this matter, please contact me at ryann@rlaland.com  
 
Sincerely, 
R LEVESQUE ASSOCIATES, INC.  
 
 
Ryan Nelson 
Wetland Scientist 
Registered Soil Scientist (SSSSNE) 

Page 89

Page 90

Page 91

Page 92

Page 93

Page 94

Page 95

5-27-2026
37 Hartford Ave, Granby, CT
Wetland Delineation Photos
Figure 1 - "T1-WET" transect vegetation Figure 2 - "T1-WET" transect hydric soil

Page 96

Figure 3 - "T1-UP" transect non-hydric soil Figure 4 - "T1-UP" transect vegetation

Page 97

 
 
 
5. FIGURES 
5.1     FIGURE 1 – USGS LOCUS MAP 
5.2     FIGURE 2 – FEMA FLOODPLAIN MAP 
5.3     FIGURE 3 – NRCS SOIL MAP 
5.4     FIGURE 4 – NATURAL DIVERSITY DATA BASE 

Page 98

Granby
CT ECO Map
Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, ©
OpenStreetMap contributors, and the GIS User Community,
Sources: Esri, Vantor, Airbus DS, USGS, NGA, NASA,
CGIAR, N Robinson, NCEAS, NLS, OS, NMA,
Geodatastyrelsen, Rijkswaterstaat, GSA, Geoland, FEMA,
CT Municipalities
World_Hillshade
4/21/2026, 12:57:48 PM
0 0.01 0.030.01 mi
0 0.03 0.050.01 km
1:943
Map created with the CT ECO Advanced Viewer. Visit CT ECO at
This map is intended for general planning, management, education, and research purposes only. Data shown on this map may not be complete or current. The data shown may have  been compiled at different times and

Page 99

National Flood Hazard Layer FIRMette
0 500 1,000 1,500 2,000250
Feet
Ü
SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT
SPECIAL FLOOD
HAZARD AREAS
Without Base Flood Elevation (BFE)
Zone A, V, A99
With BFE or Depth Zone AE, AO, AH, VE, AR
Regulatory Floodway
0.2% Annual Chance Flood Hazard, Areas
of 1% annual chance flood with average
depth less than one foot or with drainage
areas of less than one square mile Zone X
Future Conditions 1% Annual
Chance Flood Hazard Zone X
Area with Reduced Flood Risk due to
Levee. See Notes. Zone X
Area with Flood Risk due to Levee Zone D
NO SCREEN Area of Minimal Flood Hazard Zone X
Area of Undetermined Flood Hazard Zone D
Channel, Culvert, or Storm Sewer
Levee, Dike, or Floodwall
Cross Sections with 1% Annual Chance
17.5 Water Surface Elevation
Coastal Transect
Coastal Transect Baseline
Profile Baseline
Hydrographic Feature
Base Flood Elevation Line (BFE)
Effective LOMRs
Limit of Study
Jurisdiction Boundary
Digital Data Available
No Digital Data Available
Unmapped
This map complies with FEMA's standards for the use of
digital flood maps if it is not void as described below.
The basemap shown complies with FEMA's basemap
accuracy standards
The flood hazard information is derived directly from the
authoritative NFHL web services provided by FEMA. This map
was exported on 4/21/2026 at 5:04 PM  and does not
reflect changes or amendments subsequent to this date and
time. The NFHL and effective information may change or
become superseded by new data over time.
This map image is void if the one or more of the following map
elements do not appear: basemap imagery, flood zone labels,
legend, scale bar, map creation date, community identifiers,
FIRM panel number, and FIRM effective date. Map images for
unmapped and unmodernized areas cannot be used for
regulatory purposes.
Legend
OTHER AREAS OF
FLOOD HAZARD
OTHER AREAS
GENERAL
STRUCTURES
OTHER
FEATURES
MAP PANELS
8
B 20.2
The pin displayed on the map is an approximate
point selected by the user and does not represent
an authoritative property location.
1:6,000
72°47'22"W 41°57'10"N
72°46'45"W 41°56'43"N
Basemap Imagery Source: USGS National Map 2023

Page 100

Soil Map—State of Connecticut, Western Part
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
4/21/2026
Page 1 of 3
4646290 4646320 4646350 4646380 4646410 4646440 4646470 4646500 4646530 4646560 4646590
4646290 4646320 4646350 4646380 4646410 4646440 4646470 4646500 4646530 4646560 4646590
683530 683560 683590 683620 683650 683680 683710 683740
683530 683560 683590 683620 683650 683680 683710 683740
41°  56' 59'' N
72°  47' 9'' W
41°  56' 59'' N
72°  46' 59'' W
41°  56' 49'' N
72°  47' 9'' W
41°  56' 49'' N
72°  46' 59'' WN
Map projection: Web Mercator   Corner coordinates: WGS84   Edge tics: UTM Zone 18N WGS84
0 50 100 200 300
Feet
0 20 40 80 120
Meters
Map Scale: 1:1,510 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.

Page 101

MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at 
1:12,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause 
misunderstanding of the detail of mapping and accuracy of soil 
line placement. The maps do not show the small areas of 
contrasting soils that could have been shown at a more detailed 
scale.
Please rely on the bar scale on each map sheet for map 
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL: 
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator 
projection, which preserves direction and shape but distorts 
distance and area. A projection that preserves area, such as the 
Albers equal-area conic projection, should be used if more 
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as 
of the version date(s) listed below.
Soil Survey Area: State of Connecticut, Western Part
Survey Area Data: Version 6, Sep 16, 2025
Soil map units are labeled (as space allows) for map scales 
1:50,000 or larger.
Date(s) aerial images were photographed: Jun 14, 2022—Jul 1, 
2024
The orthophoto or other base map on which the soil lines were 
compiled and digitized probably differs from the background 
imagery displayed on these maps. As a result, some minor 
shifting of map unit boundaries may be evident.
Soil Map—State of Connecticut, Western Part
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
4/21/2026
Page 2 of 3

Page 102

Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
29A Agawam fine sandy loam, 0 to 
3 percent slopes
1.0 21.9%
38E Hinckley loamy sand, 15 to 45 
percent slopes
3.0 63.2%
108 Saco silt loam, frequently 
ponded, 0 to 2 percent 
slopes, frequently flooded
0.7 14.9%
Totals for Area of Interest 4.8 100.0%
Soil Map—State of Connecticut, Western Part
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
4/21/2026
Page 3 of 3

Page 103

FF
FF
FF
Granby
CT ECO Map
Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, ©
OpenStreetMap contributors, and the GIS User Community,
Sources: Esri, Vantor, Airbus DS, USGS, NGA, NASA,
CGIAR, N Robinson, NCEAS, NLS, OS, NMA,
Geodatastyrelsen, Rijkswaterstaat, GSA, Geoland, FEMA,
CT Municipalities
Critical Habitats
Beachshore
Intertidal Marsh
Acidic Atlantic White Cedar Swamp
Acidic Red/Black Spruce Basin Swamp
Circumneutral Northern White Cedar Swamp
Floodplain Forest
Beachshore Riverine
Circumneutral Spring Fen
Alluvial Marsh
Freshwater Aquatic
Medium Fen
Poor Fen
Rich Fen
Sea Level Fen
Coastal Woodland/Shrubland
Dry Acidic Forest
Dry Circumneutral Forest
Dry Subacidic Forest
Old Growth Forest
Subacidic Cold Talus Forest/Woodland
Acidic Rocky Summit Outcrop
Alluvial Grassland/Outcrop
Circumneutral Rocky Summit Outcrop
Coastal Bluffs and Headlands
Coastal Grassland
Sand Barren
Subacidic Rocky Summit Outcrop
Natural Diversity Area
World_Hillshade
4/21/2026, 1:00:49 PM
0 0.04 0.090.02 mi
0 0.07 0.140.04 km
1:2,631
Map created with the CT ECO Advanced Viewer. Visit CT ECO at
This map is intended for general planning, management, education, and research purposes only. Data shown on this map may not be complete or current. The data shown may have  been compiled at different times and

Page 104

 
 
 
6. ABUTTER NOTIFICATION 
6.1     ABUTTER LIST – 100’ 
6.2   ABUTTER NOTIFICATION LETTER (TO BE PROVIDED UPON CONFIRMATION IF PUBLIC   
HEARING IS NECESSARY) 

Page 105

Abutting Property Owners - 100'
37 Hartford Avenue, Granby, CT 06035
(Parcel ID: 4254)
Source: Town of Granby GIS
Generated On: 05/27/2026
NAME ADDRESS TOWN STATE ZIP CODE
ERIK & JENNIFER CHRISTENSEN 36 HARTFORD AVENUE GRANBY CT 06035
JON FYFE 40 HARTFORD AVENUE GRAMNY CT 06035
EST. OF DEBORAH ALVESTAD 10 TOWER LANE, SUITE 325 AVON CT 06001
*INFORMATION SUPPRESSED BY TAXPAYER* 44 HARTFORD AVENUE GRANBY CT 06035
KEVIN & LAURA LAFLAMME 49 HARTFORD AVENUE GRANBY CT 06035
JAMES & AMANDA RAY 933 OX YOKE ROAD ORANGE CT 06477
NOAH & MEGHAN DAVINI 43 HARTFORD AVENUE GRAMBY CT 06035
MDU REALTY, LLC PO BOX 390 GRANBY CT 06035
FRANCIS REAL ESTATE HOLDINGS, LLC 488 NEWTON STREET SOUTH HADLEY MA 01075
RACHELLE CINQUE, TRUSTEE & MALCOM MCGREGOR 23 BEEHOLM ROAD REDDING CT 06896
KEVIN COUSIN 65 WINDMILL DRIVE GRANBY CT 06035
PETER VOSKOWSKY 53 WINDMILL DRIVE GRANBY CT 06035

Page 106

 
 
 
APPENDIX A: SITE PLAN SET 
SITE PLAN SET ENTITLED “PROPOSED RESIDENTIAL DEVELOPMENT” 
PREPARED FOR FORREST DEVINE 
PREPARED BY R LEVESQUE ASSOCIATES, INC. 
DATED MAY 28, 2026 
 
 
 
 
 

Page 107

 
 
 
APPENDIX B: STORMWATER REPORT 
STORMWATER DRAINAGE REPORT 
PREPARED FOR FORREST DEVINE 
PREPARED BY R LEVESQUE ASSOCIATES, INC. 
DATED MAY 28, 2026 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Page 108

E
HARTFORD AVE
PROPOSED RESIDENTIAL
BUILDING
EXISTING DRIVEWAY
SEPTIC DESIGN PLAN
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION SAN-1 -
PERC TEST #2 DATA
SEPTIC SYSTEM PROFILE
NO SCALE
PERC TEST #1 DATA
DISTRIBUTION BOX DETAIL
NO SCALE
≥
≥
≥
≥
GEOMATRIX GST6236  LEACHING SYSTEM - SECTION A-A'
GEOMATRIX GST6236  LEACHING SYSTEM - PLAN VIEW
≥
≥
≥
GEOMATRIX GST6236  LEACHING SYSTEM - SECTION B-B'
GEOMATRIX GST  LEACHING SYSTEM - INSPECTION PORT
June 10, 2026
SUBSURFACE SEWAGE DISPOSAL SYSTEM PLAN
DRAFT

Page 109

HARTFORD AVE
WINDMILL DR.
SHATTUCK AVE
RUSHFORD MEADE
BANK ST
OAKRIDGE DR
SITE
BY
Site Plans
AS PREPARED FOR
Proposed Residential Development
May 28, 2026
RLA Project Number: 251219
129 Lovers Lane
Granville, MA 01034
Mr. Forrest Devine
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
40 School Street  ·  Westfield, MA  ·  01085
ph 413.568.0985  ·  fax 413.568.0986
www.rlaland.com
R LEVESQUE
ASSOCIATES
INC
A LAND PLANNING SERVICES COMPANYR L A
DRAWING INDEX
SHEET NO. SHEET NAME ISSUE DATE
T-1 TITLE SHEET 5/28/26
EX-1 EXISTING CONDITIONS PLAN 5/27/26
C-1 NOTES, SYMBOL & LINE LEGEND, AND ABBREVIATIONS 5/28/26
C-2 CONSTRUCTION NOTES 5/28/26
C-3 DEMOLITION AND REMOVALS PLAN 5/28/26
C-4 LAYOUT AND MATERIALS PLAN 5/28/26
C-5 GRADING, EROSION & SEDIMENTATION CONTROL PLAN 5/28/26
C-6 DRAINAGE AND UTILITIES PLAN 5/28/26
C-7 LANDSCAPING PLAN 5/28/26
SL-1 PHOTOMETRIC PLAN 5/28/26
SL-2 LIGHTING FIXTURE DETAILS 5/28/26
D-1 DETAILS 5/28/26
D-2 DETAILS 5/28/26
D-3 DETAILS 5/28/26
D-4 DETAILS 5/28/26
D-5 DETAILS 5/28/26
PERMITTING
NOT FOR CONSTRUCTION

Page 110

p p p p p p p p p p
p
p
p p
Hartford   Avenue
EXISTING
FOUNDATION
WALLS
#41
#35
(CT - Route 189)
p p p p p p
p
p p p
p
p
p
p
p
p
p p p p p
p
p
p
p p p p p p p p p p p p p p p p p p p p p p
Limited Property/Boundary Survey
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - EXIST.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
DRAFTED BY:
As Noted
A.Z./J.L.
May 27, 2026
251219 37 Hartford Avenue
MLBU G-53/78/13
Granby, CT 06035
Forrest Devine
129 Lovers Lane
Granville, MA 01034
EX-1 -
ZONING REVIEW - Granby Center Zone
Commerial Center (COCE)
TYPE (MINIMUM) REQUIRED PROPOSED
AREA 20,000 SQ FT -
FRONTAGE 100 FT -
DEPTH 150 FT -
FRONT YARD 25 FT --
SIDE YARD 10 FT -
REAR YARD 20 FT -
HEIGHT (MAX) 3 STORIES (45 FT) -
BUILDING COVERAGE (MAX) 30% -
pppppp
C.S.P.C.S.
LOCUS MAP SCALE 1"=1000'

Page 111

NOTES, SYMBOL & LINE
LEGEND AND ABBREVIATIONS
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION C-1 -
X
pppppp
·
·
·
·
·
·
·
·
·
·
·
·
·
·

Page 112

CONSTRUCTION NOTES
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION C-2 -

Page 113

p p p p p p p p p p
p
p
p p
Hartford   Avenue
EXISTING
FOUNDATION
WALLS
#41
#35
(CT - Route 189)
p p p p p
p
p
p p p
p
p
p
p
p
p
p p p p p
p
p
p
p p p p p p p p p p p p p p
p
p p p
p p p p
DEMOLITION & REMOVALS PLAN
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION C-3 -

Page 114

p p p p p p p p p p
p
p
p p
Hartford   Avenue
(CT - Route 189)
p p p p p
p
p
p p p
p
p
p
p
p
p
p p p p p
p
p
p
p p p p p p p p p p p p p p
p
p p p
p p p p
3-STORY RESIDENTIAL
BUILDING
±5,447 S.F. PER STORY
STOP
LAYOUT & MATERIALS PLAN
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION C-4 -
ZONING REVIEW - COMMERCIAL CENTER (COCE)
TYPE (MINIMUM) REQUIRED EXISTING/PROPOSED
LOT AREA 20,000 FT2 111,184± FT2
LOT FRONTAGE 100 FT 170± FT
LOT DEPTH 150 FT 310± FT
FRONT YARD 25 FT 88.6± FT
SIDE YARD 10 FT 24.2± FT
REAR YARD 20 FT 177.2± FT
HEIGHT (MAX) 45 FT (3 STORIES) 3 STORIES
BUILDING COVERAGE (MAX) 8,000 FT2 5,447 FT2
LOT COVERAGE (MAX) 30% 22.3%
LANDSCAPED AREA (MIN.) 20% 77.7%
PARKING 31 33
*PARKING REQUIREMENTS:
Multi-Family (2 bedrooms or more) - 2 spaces per unit
Thirteen (13) 2-bedroom units x 2 spaces/unit = 26 spaces
Multi-Family (1 bedroom) - 1.5 spaces per unit
Three (3) 1-bedroom units x 2 spaces/unit = 5 spaces
Total Required Parking Spaces = 31 spaces

Page 115

p p p p p p p p p p
p
p
p p
Hartford   Avenue
(CT - Route 189)
p p p p p
p
p
p p p
p
p
p
p
p
p
p p p p p
p
p
p
p p p p p p p p p p p p p p
p
p p p
p p p p
3-STORY RESIDENTIAL
BUILDING
±5,447 S.F. PER STORY
FIRST STORY
F.F.E.=200.50±
SECOND STORY
F.F.E=213.75±
GRADING, EROSION &
SEDIMENTATION CONTROL PLAN
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION C-5 -

Page 116

p p p p p p p p p p
p
p
p p
Hartford   Avenue
(CT - Route 189)
p p p p p
p
p
p p p
p
p
p
p
p
p
p p p p p
p
p
p
p p p p p p p p p p p p p p
p
p p p
p p p p
3-STORY RESIDENTIAL
BUILDING
±5,447 S.F. PER STORY
E
DRAINAGE & UTILITIES PLAN
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION C-6 -

Page 117

p p p p p p p p p p
p
p
p p
Hartford   Avenue
(CT - Route 189)
p p p p p
p
p
p p p
p
p
p
p
p
p
p p p p p
p
p
p
p p p p p p p p p p p p p p
p
p p p
p p p p
3-STORY RESIDENTIAL
BUILDING
±5,447 S.F. PER STORY
E
STOP
SITE LANDSCAPING PLAN
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION C-7 -

Page 118

Luminaire Schedule
QtyLabel
Description
Tag
LLF
LuminaireLumens
LuminaireWatts
TotalWatts
3S4W
PROV2-36L-325-3K7-4W
16 FTAG0.900
3813
37.82
113.46
1S5Q
PROV2-36L-325-3K7-5Q
16 FTAG0.900
4158
37.82
37.82
1WP4F
BEACON: RWL1-48L-10-3K7-4F-UNV
9' FTAG0.900
1232
10.1
10.1
7WP4
BEACON: RWL1-48L-10-3K7-4W-U
9' FTAG0.900
1285
10.1
70.7
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.2
0.3
0.3
0.5
0.5
0.4
0.4
0.3
0.2
0.2
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.5
0.7
0.3
0.9
1.0
1.5
1.4
1.3
1.7
1.1
0.9
0.4
0.6
0.5
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.6
1.3
0.3
1.5
1.9
2.6
2.5
2.4
2.9
2.1
1.7
0.4
1.6
0.8
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.7
1.5
1.8
0.8
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.7
1.3
1.5
0.8
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.2
0.3
0.4
0.3
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.4
0.4
0.4
0.3
0.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.3
1.2
0.8
1.2
1.0
1.2
1.0
0.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.4
1.0
1.3
1.6
2.3
2.0
1.6
1.4
1.6
1.5
1.5
1.2
1.5
1.0
0.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.3
0.5
0.5
1.2
1.6
1.7
1.1
0.7
1.1
1.4
1.1
0.2
1.2
1.0
0.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.2
0.4
0.5
0.5
0.5
0.2
0.6
1.4
1.6
1.2
1.6
1.1
0.3
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.2
0.2
0.2
0.2
0.2
0.3
0.4
0.3
0.3
0.6
1.3
1.2
1.1
1.3
1.1
0.3
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.2
0.4
0.5
0.4
0.4
0.5
0.7
0.7
0.6
0.5
0.6
0.7
0.8
0.7
0.6
0.5
0.5
0.4
0.3
0.3
0.3
0.4
0.2
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.4
0.8
1.0
0.8
0.7
0.9
1.2
1.2
1.2
0.9
0.7
0.8
1.0
0.7
0.4
0.5
0.8
0.9
0.7
0.6
0.8
0.8
0.4
0.2
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.4
0.9
1.3
1.1
1.0
1.3
1.4
1.5
1.4
1.2
1.0
1.2
1.2
0.8
0.4
0.5
1.0
1.2
0.9
0.9
1.2
1.0
0.6
0.2
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.4
0.7
1.4
1.5
1.0
1.6
1.3
1.3
1.4
1.6
1.0
1.6
1.2
0.7
0.4
0.5
0.9
1.5
1.5
1.2
1.6
1.0
0.6
0.2
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.2
0.4
0.4
0.4
0.3
0.5
0.3
0.4
0.3
0.4
0.3
0.3
0.2
0.3
0.3
0.5
0.5
0.4
0.6
0.5
0.4
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.2
0.2
0.2
0.1
0.1
0.1
0.2
0.3
0.2
0.1
0.1
0.0
0.1
0.1
0.2
0.3
0.3
0.2
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.2
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.0
0.0
0.0
0.1
0.2
0.1
0.1
0.2
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
S4W
S4W
S4W
S5Q
WP4
WP4
WP4F
WP4
WP4
WP4
WP4
WP4
Sheet 1 of 2
333 Pleasant Valley Road
South Windsor, CT 06074
(860) 282-0597
263 Winn Street
Burlington, MA 01803
(781) 935-8500
Drawing Number:
Detail: Photometric Calculation
Date: 05/28/2026
Revision:--
Scale:  1"=20'
Drawn By: MGS
Project:
37 Hartford Ave
Grandby, CT
Sheet 1 of 2
SL-1

Page 119

333 Pleasant Valley Road
South Windsor, CT 06074
(860) 282-0597
263 Winn Street
Burlington, MA 01803
(781) 935-8500
Drawing Number:
WP4/W4F - BEACON RATIO WALL
S4W / S5Q - VIPER AREA
Sheet 2 of 2
SL-2
Detail: Photometric Calculation
Date: 05/28/2026
Revision:--
Scale:  1"=20'
Drawn By: MGS
Project:
37 Hartford Ave
Grandby, CT

Page 120

DETAILS
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION D-1 -
SILT FENCE DETAIL
SHRUB PLANTING DETAIL
TREE PLANTING DETAIL
ANTI-TRACKING APRON (AS REQ'D)
A
A
REINFORCED CONCRETE SIDEWALK SECTION
INLET PROTECTION - SEDIMENT FILTER SACK
MONOLITHIC CONCRETE CURB & SIDEWALK
BITUMINOUS CONCRETE PAVING DETAIL
INLET PROTECTION - HAY BALES SLOPE PROTECTION MATERIAL INSTALLATION (AS REQ'D)
6" BITUMINOUS CONCRETE LIP CURBING
HANDICAP PARKING STALL
EROSION CONTROL LOG

Page 121

DETAILS
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION D-2 -
TYPICAL SECTION - SEGMENTAL PRECAST CONCRETE RETAINING WALL
LIGHT POLE INSTALLATION DETAIL
DUMPSTER ENCLOSURE
STEEL BOLLARD WITH SIGN DETAIL
6' STANDARD SINGLE SIDE WHEEL STOP

Page 122

3-STORY RESIDENTIAL
BUILDING
±5,447 S.F. PER STORY
DETAILS
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION D-3 -
OUTLET CONTROL STRUCTURE (POCS-1)
INLET CONTROL STRUCTURE (PICS-1)
SUBSURFACE INFILTRATION BASIN  
CATCH BASIN
OR MANHOLE
SC-800 END CAP
OPTIONAL INSPECTION PORT
SC-800 CHAMBER
ONE LAYER OF ADSPLUS625 WOVEN GEOTEXTILE BETWEEN
FOUNDATION STONE AND CHAMBERS
5' MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS
24" (600 mm) HDPE ACCESS PIPE REQUIRED
USE END CAP PART #: SC800ECEZ
STORMTECH HIGHLY RECOMMENDS
FLEXSTORM INSERTS IN ANY UPSTREAM
STRUCTURES WITH OPEN GRATES
SUMP DEPTH TBD BY
SITE DESIGN ENGINEER
(24" MIN RECOMMENDED)
INSTALL FLAMP ON 24" (600 mm) ACESS PIPE
PART #: SC80024RAMP
ELEVATED BYPASS MANIFOLD
12" (300 mm) MIN 12"  MIN51"3" MINSUBGRADE SOILS
(SEE MANUFACTURER'S RECOMMENDATION)
PAVEMENT LAYER (DESIGNED
BY SITE DESIGN ENGINEER)
8' MAX
ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL
AROUND CLEAN, CRUSHED, ANGULAR STONE
*TO BOTTOM OF FLEXIBLE PAVEMENT. FOR
UNPAVED INSTALLATIONS WHERE RUTTING
FROM VEHICLES MAY OCCUR, INCREASE
COVER TO 21". 15"
6" MIN
EXCAVATION WALL
(CAN BE SLOPED OR VERTICAL)
PERIMETER STONE
(SEE MANUFACTURER'S RECOMMENDATION)
SC-800 END CAP
33"
6" MIN
GRANULAR WELL GRADED SOIL/AGGREGATE MIXTURES, <35%
FINES. COMPACT IN 6" LIFTS TO 95% STANDARD PROCTOR
DENSITY. SEE THE TABLE OF ACCEPTABLE FILL MATERIALS.
STORMTECH SC-800 ISOLATOR ROW DETAIL
STORMTECH SC-800 CROSS-SECTION
NOTE:
INSPECTION PORTS MAY BE CONNECTED THROUGH ANY CHAMBER CORRUGATION CREST.
STORMTECH CHAMBER
8" NYLOPLAST UNIVERSAL INLINE DRAIN
BODY (PART# 2708AG4IPKIT) OR TRAFFIC
RATED BOX W/SOLID LOCKING COVER
CONCRETE COLLAR
ASPHALT OVERLAY FOR
TRAFFIC APPLICATIONS
12" MIN WIDTH
8" MIN THICKNESS OF ASPHALT
OVERLAY AND CONCRETE COLLAR
CONCRETE COLLAR / ASPHALT OVERLAY
NOT REQUIRED FOR GREENSPACE OR
NON-TRAFFIC APPLICATIONS
4" SDR 35 PIPE
4" INSERTA TEE
TO BE CENTERED ON CORRUGATION CREST
NYLOPLAST 8" LOCKING SOLID
COVER AND FRAME
INSERTA TEE DETAIL
NTS
INSERTA TEE
CONNECTION
CONVEYANCE PIPE
MATERIAL MAY VARY
(PVC, HDPE, ETC.)
PLACE ADSPLUS WOVEN GEOTEXTILE
(CENTERED ON INSERTA-TEE INLET) OVER
BEDDING STONE FOR SCOUR PROTECTION AT
SIDE INLET CONNECTIONS. GEOTEXTILE MUST
EXTEND 6" PAST CHAMBER FOOT
INSERTA TEE TO BE
INSTALLED, CENTERED
OVER CORRUGATION
SIDE VIEWSECTION A-A
A
A
DO NOT INSTALL
INSERTA-TEE AT
CHAMBER JOINTS
NOTES:
· PART NUMBERS WILL VARY BASED ON INLET PIPE
MATERIALS. CONTACT STORMTECH FOR MORE
INFORMATION.
· CONTACT ADS ENGINEERING SERVICES IF INSERTA TEE
INLET MUST BE RAISED AS NOT ALL INVERTS ARE
POSSIBLE.
CHAMBER MAX DIAMETER OF INSERTA TEE HEIGHT FROM BASE OF CHAMBER (X)
SC-310 6" (150 mm) 4" (100 mm)
SC-800 10" (250 mm) 4" (100 mm)
DC-780 10" (250 mm) 4" (100 mm)
MC-3500 12" (300 mm) 6" (150 mm)
MC-4500 12" (300 mm) 8" (200 mm)
MC-7200 12" (300 mm) 8" (200 mm)
INSERTA TEE FITTINGS AVAILABLE FOR SDR 26, SDR 35, SCH 40 IPS
GASKETED & SOLVENT WELD, N-12, HP STORM, C-900 OR DUCTILE IRON
(X)
STORMTECH SC-800 INSPECTION PORT DETAIL STORMTECH INSERTA-TEE SIDE INLET DETAIL

Page 123

DETAILS
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION D-4 -
(36" MIN)
7.08'
12" (MIN)
7.00'(MIN.)
[84.0"]
WATER QUALITY UNIT - BARRACUDA S4 (PWQU-1)
VARIABLE OUTLET LOCATIONS
VARIABLE INLET LOCATIONS
DOWNSPOUT COLLECTOR DETAIL
PRECAST CONCRETE CATCH BASIN
ADS NYLOPLAST YARD DRAIN BASIN
STANDARD DRAINAGE MANHOLE DETAIL

Page 124

DETAILS
REV.
RLA PROJ. NUMBER:
DRAWING#
OF MASSACHUSETTS STATE LAW
THIS DOCUMENT IS A VIOLATION
UNAUTHORIZED ALTERATION OF
DATE:
ISSUANCE DATE:
REVISIONS:
PREPARED FOR:
ph: 413.568.0985  fax: 413.568.0986
rlaland.com
Westfield, MA 01085
R L A
40 School Street
SCALE:
S:\Projects\2025\251219 - Devine - 37 Hartford Ave., Granby, CT\05 Civil 3D\251219 - SITE.dwg
Landscape Architects
Civil Engineers · Land Surveyors
Environmental Consultants
R LEVESQUEASSOCIATES
INC
37 Hartford Avenue
Granby, CT 06035
Parcel ID: 4254
DRAFTED BY:
As Noted
R.E.L.
May 28, 2026
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
PERMITTING
NOT FOR CONSTRUCTION D-5 -

Page 125

Page 126

Page 127

 
 ............................................................................................................................ 1-3 
  .................................................................................................................... 2-4 
  ................................................................................................... 2-4 
  .......................................................................................................................... 2-4 
  ................................................................................................................................... 2-4 
  ....................................................................................... 2-5 
  ........................................................................................................ 2-5 
 ............................................................................................................................................... 2-5 
 ................................................................................................ 2-6 
  ........................................................................ 3-7 
  ............................................................................................................. 3-7 
  .............................................................................................................................. 3-8 
  .................................................................................................. 3-8 
  ................................................................................................ 3-8 
  ............................................................................................................... 3-9 
  ..................................................................................................................... 3-9 
  .................................................................. 3-9 
  ........................................................................... 3-11 
  ..................................................................................... 3-11 
  ..................................................................................... 3-11 
  ............................................................................................... 3-12 
  ........... 3-12 
  ............... 3-12 
  ............................................................................ 3-12 
  .......................................... 3-12 
  .............................................................................................................................. 4-13 
 ............................................................................................................. 2-5 
 ........................................................................................................................................... 3-7 
 ................................................................................... 3-9 

Page 128

 
  
  
  
  
  
  
  
  
 
 
  
  
  
  
  
  
 
 
 
 
 
 
 
 
 

Page 129

 
 
 
 
 
 
 

Page 130

 
 
 
 
 

Page 131

 
 
 
 

Page 132

 
 
 
 
 
 

Page 133

 
 
 

Page 134

 
 
 
 
 
 

Page 135

 
 
 
 
 

Page 136

 
 
 
 

Page 137

 
 
 
 
 
 

Page 138

 
 
 
 
 
 

Page 139

 
 
 

Page 140

Page 141

 
 

Page 142

Page 143

SITE
R L A
SCALE:
DATE:
JOB NO:
ph: 413.568.0985    fax: 413.568.0986     rlaland.com
40 School Street  ·  P.O. Box 640  ·  Westfield, MA 01086
R LEVESQUE ASSOCIATES, INC
A Land Planning Services Company
251219
5/28/2026
As noted
Mr. Forrest Devine
129 Lovers Lane
Granville, Massachusetts 01034
Proposed Residential Development
37 Hartford Avenue
Granby, Connecticut 06035R L A
SCALE:
DATE:
JOB NO:
ph: 413.568.0985    fax: 413.568.0986     rlaland.com
40 School Street  ·  P.O. Box 640  ·  Westfield, MA 01086
R LEVESQUE ASSOCIATES, INC
A Land Planning Services Company
251219
5/28/2026
As noted
Mr. Forrest Devine
129 Lovers Lane
Granville, Massachusetts 01034
Proposed Residential Development
37 Hartford Avenue
Granby, Connecticut 06035
FIG-1
SITE LOCUS
USGS MAP

Page 144

Page 145

 
 

Page 146

Page 147

SITE
R L A
SCALE:
DATE:
JOB NO:
ph: 413.568.0985    fax: 413.568.0986     rlaland.com
40 School Street  ·  P.O. Box 640  ·  Westfield, MA 01086
R LEVESQUE ASSOCIATES, INC
A Land Planning Services Company
251219
5/28/2026
As noted
Mr. Forrest Devine
129 Lovers Lane
Granville, Massachusetts 01034
Proposed Residential Development
37 Hartford Avenue
Granby, Connecticut 06035
FIG-2
FEMA
FLOOD MAP
Flood Zone
Boundary

Page 148

Page 149

 

Page 150

Page 151

SITE
CRITICAL HABITAT
R L A
SCALE:
DATE:
JOB NO:
ph: 413.568.0985    fax: 413.568.0986     rlaland.com
40 School Street  ·  P.O. Box 640  ·  Westfield, MA 01086
R LEVESQUE ASSOCIATES, INC
A Land Planning Services Company
251219
5/28/2026
As noted
Mr. Forrest Devine
129 Lovers Lane
Granville, Massachusetts 01034
Proposed Residential Development
37 Hartford Avenue
Granby, Connecticut 06035
FIG-3
NDDB Map
NDDB
Area

Page 152

Page 153

 
 

Page 154

Page 155

SITE
R L A
SCALE:
DATE:
JOB NO:
ph: 413.568.0985    fax: 413.568.0986     rlaland.com
40 School Street  ·  P.O. Box 640  ·  Westfield, MA 01086
R LEVESQUE ASSOCIATES, INC
A Land Planning Services Company
251219
5/28/2026
As noted
Mr. Forrest Devine
129 Lovers Lane
Granville, Massachusetts 01034
Proposed Residential Development
37 Hartford Avenue
Granby, Connecticut 06035
FIG-4
Aquifer Protection Area Map
Aquifer Protection
 Area

Page 156

Page 157

 
 

Page 158

Page 159

Hartford   Avenue
EXISTING
FOUNDATION
WALLS
#41
#35
(CT - Route 189)
p
p
p p
p
p p p p p p
p p
p p p
p
p p p p p
p
29A
Agawam Fine Sandy Loam
Hydrologic Group: B
38E
Hinckley Loamy Sand
Hydrologic Group: A
SCALE:
DATE:
JOB NO.:
ph: 413.568.0985    fax: 413.568.0986     rlaland.com
40 School Street  ·  P.O. Box 640  ·  Westfield, MA 01086
R LEVESQUE ASSOCIATES, INC
A Land Planning Services CompanyPre-Development Area Plan
Proposed Residential Development
37 Hartford Avenue
Granby, CT 06035
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
5/28/26
As Noted
FIG-5

Page 160

Page 161

 
 

Page 162

Page 163

Hartford   Avenue
EXISTING
FOUNDATION
WALLS
#41
#35
(CT - Route 189)
p
p
p p
p
p p p p p p
p p
p p p
p
p p p p p
p
3-STORY RESIDENTIAL
BUILDING
±5,447 S.F. PER STORY
29A
Agawam Fine Sandy Loam
Hydrologic Group: B
38E
Hinckley Loamy Sand
Hydrologic Group: A
SCALE:
DATE:
JOB NO.:
ph: 413.568.0985    fax: 413.568.0986     rlaland.com
40 School Street  ·  P.O. Box 640  ·  Westfield, MA 01086
R LEVESQUE ASSOCIATES, INC
A Land Planning Services CompanyPost-Development Area Plan
Proposed Residential Development
37 Hartford Avenue
Granby, CT 06035
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
5/28/26
As Noted
FIG-6

Page 164

Page 165

 

Page 166

Page 167

Hartford   Avenue
EXISTING
FOUNDATION
WALLS
#41
#35
(CT - Route 189)
p
p
p p
p
p p p p p p
p p
p p p
p
p p p p p
p
3-STORY RESIDENTIAL
BUILDING
±5,447 S.F. PER STORY
29A
Agawam Fine Sandy Loam
Hydrologic Group: B
38E
Hinckley Loamy Sand
Hydrologic Group: A
SCALE:
DATE:
JOB NO.:
ph: 413.568.0985    fax: 413.568.0986     rlaland.com
40 School Street  ·  P.O. Box 640  ·  Westfield, MA 01086
R LEVESQUE ASSOCIATES, INC
A Land Planning Services CompanyInlet Area Plan
Proposed Residential Development
37 Hartford Avenue
Granby, CT 06035
Mr. Forrest Devine
129 Lovers Lane
Granville, MA 01034
251219
5/28/26
As Noted
FIG-7

Page 168

Page 169

 

Page 170

Page 171

United States
Department of
Agriculture
A product of the National
Cooperative Soil Survey,
a joint effort of the United
States Department of
Agriculture and other
Federal agencies, State
agencies including the
Agricultural Experiment
Stations, and local
participants
Custom Soil Resource 
Report for
State of 
Connecticut, 
Western Part
Natural
Resources
Conservation
Service
May 11, 2026

Page 172

Preface
Soil surveys contain information that affects land use planning in survey areas. 
They highlight soil limitations that affect various land uses and provide information 
about the properties of the soils in the survey areas. Soil surveys are designed for 
many different users, including farmers, ranchers, foresters, agronomists, urban 
planners, community officials, engineers, developers, builders, and home buyers. 
Also, conservationists, teachers, students, and specialists in recreation, waste 
disposal, and pollution control can use the surveys to help them understand, 
protect, or enhance the environment.
Various land use regulations of Federal, State, and local governments may impose 
special restrictions on land use or land treatment. Soil surveys identify soil 
properties that are used in making various land use or land treatment decisions. 
The information is intended to help the land users identify and reduce the effects of 
soil limitations on various land uses. The landowner or user is responsible for 
identifying and complying with existing laws and regulations.
Although soil survey information can be used for general farm, local, and wider area 
planning, onsite investigation is needed to supplement this information in some 
cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/
portal/nrcs/main/soils/health/) and certain conservation and engineering 
applications. For more detailed information, contact your local USDA Service Center 
(https://offices.sc.egov.usda.gov/locator/app?agency=nrcs) or your NRCS State Soil 
Scientist (http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/contactus/?
cid=nrcs142p2_053951).
Great differences in soil properties can occur within short distances. Some soils are 
seasonally wet or subject to flooding. Some are too unstable to be used as a 
foundation for buildings or roads. Clayey or wet soils are poorly suited to use as 
septic tank absorption fields. A high water table makes a soil poorly suited to 
basements or underground installations.
The National Cooperative Soil Survey is a joint effort of the United States 
Department of Agriculture and other Federal agencies, State agencies including the 
Agricultural Experiment Stations, and local agencies. The Natural Resources 
Conservation Service (NRCS) has leadership for the Federal part of the National 
Cooperative Soil Survey.
Information about soils is updated periodically. Updated information is available 
through the NRCS Web Soil Survey, the site for official soil survey information.
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its 
programs and activities on the basis of race, color, national origin, age, disability, 
and where applicable, sex, marital status, familial status, parental status, religion, 
sexual orientation, genetic information, political beliefs, reprisal, or because all or a 
part of an individual's income is derived from any public assistance program. (Not 
all prohibited bases apply to all programs.) Persons with disabilities who require 
2

Page 173

alternative means for communication of program information (Braille, large print, 
audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice 
and TDD). To file a complaint of discrimination, write to USDA, Director, Office of 
Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or 
call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity 
provider and employer.
3

Page 174

Contents
Preface.................................................................................................................... 2
How Soil Surveys Are Made..................................................................................5
Soil Map.................................................................................................................. 8
Soil Map................................................................................................................9
Legend................................................................................................................10
Map Unit Legend................................................................................................ 11
Map Unit Descriptions.........................................................................................11
State of Connecticut, Western Part.................................................................13
29A—Agawam fine sandy loam, 0 to 3 percent slopes...............................13
38E—Hinckley loamy sand, 15 to 45 percent slopes..................................14
References............................................................................................................17
4

Page 175

How Soil Surveys Are Made
Soil surveys are made to provide information about the soils and miscellaneous 
areas in a specific area. They include a description of the soils and miscellaneous 
areas and their location on the landscape and tables that show soil properties and 
limitations affecting various uses. Soil scientists observed the steepness, length, 
and shape of the slopes; the general pattern of drainage; the kinds of crops and 
native plants; and the kinds of bedrock. They observed and described many soil 
profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The 
profile extends from the surface down into the unconsolidated material in which the 
soil formed or from the surface down to bedrock. The unconsolidated material is 
devoid of roots and other living organisms and has not been changed by other 
biological activity.
Currently, soils are mapped according to the boundaries of major land resource 
areas (MLRAs). MLRAs are geographically associated land resource units that 
share common characteristics related to physiography, geology, climate, water 
resources, soils, biological resources, and land uses (USDA, 2006). Soil survey 
areas typically consist of parts of one or more MLRA.
The soils and miscellaneous areas in a survey area occur in an orderly pattern that 
is related to the geology, landforms, relief, climate, and natural vegetation of the 
area. Each kind of soil and miscellaneous area is associated with a particular kind 
of landform or with a segment of the landform. By observing the soils and 
miscellaneous areas in the survey area and relating their position to specific 
segments of the landform, a soil scientist develops a concept, or model, of how they 
were formed. Thus, during mapping, this model enables the soil scientist to predict 
with a considerable degree of accuracy the kind of soil or miscellaneous area at a 
specific location on the landscape.
Commonly, individual soils on the landscape merge into one another as their 
characteristics gradually change. To construct an accurate soil map, however, soil 
scientists must determine the boundaries between the soils. They can observe only 
a limited number of soil profiles. Nevertheless, these observations, supplemented 
by an understanding of the soil-vegetation-landscape relationship, are sufficient to 
verify predictions of the kinds of soil in an area and to determine the boundaries.
Soil scientists recorded the characteristics of the soil profiles that they studied. They 
noted soil color, texture, size and shape of soil aggregates, kind and amount of rock 
fragments, distribution of plant roots, reaction, and other features that enable them 
to identify soils. After describing the soils in the survey area and determining their 
properties, the soil scientists assigned the soils to taxonomic classes (units). 
Taxonomic classes are concepts. Each taxonomic class has a set of soil 
characteristics with precisely defined limits. The classes are used as a basis for 
comparison to classify soils systematically. Soil taxonomy, the system of taxonomic 
classification used in the United States, is based mainly on the kind and character 
of soil properties and the arrangement of horizons within the profile. After the soil 
5

Page 176

scientists classified and named the soils in the survey area, they compared the 
individual soils with similar soils in the same taxonomic class in other areas so that 
they could confirm data and assemble additional data based on experience and 
research.
The objective of soil mapping is not to delineate pure map unit components; the 
objective is to separate the landscape into landforms or landform segments that 
have similar use and management requirements. Each map unit is defined by a 
unique combination of soil components and/or miscellaneous areas in predictable 
proportions. Some components may be highly contrasting to the other components 
of the map unit. The presence of minor components in a map unit in no way 
diminishes the usefulness or accuracy of the data. The delineation of such 
landforms and landform segments on the map provides sufficient information for the 
development of resource plans. If intensive use of small areas is planned, onsite 
investigation is needed to define and locate the soils and miscellaneous areas.
Soil scientists make many field observations in the process of producing a soil map. 
The frequency of observation is dependent upon several factors, including scale of 
mapping, intensity of mapping, design of map units, complexity of the landscape, 
and experience of the soil scientist. Observations are made to test and refine the 
soil-landscape model and predictions and to verify the classification of the soils at 
specific locations. Once the soil-landscape model is refined, a significantly smaller 
number of measurements of individual soil properties are made and recorded. 
These measurements may include field measurements, such as those for color, 
depth to bedrock, and texture, and laboratory measurements, such as those for 
content of sand, silt, clay, salt, and other components. Properties of each soil 
typically vary from one point to another across the landscape.
Observations for map unit components are aggregated to develop ranges of 
characteristics for the components. The aggregated values are presented. Direct 
measurements do not exist for every property presented for every map unit 
component. Values for some properties are estimated from combinations of other 
properties.
While a soil survey is in progress, samples of some of the soils in the area generally 
are collected for laboratory analyses and for engineering tests. Soil scientists 
interpret the data from these analyses and tests as well as the field-observed 
characteristics and the soil properties to determine the expected behavior of the 
soils under different uses. Interpretations for all of the soils are field tested through 
observation of the soils in different uses and under different levels of management. 
Some interpretations are modified to fit local conditions, and some new 
interpretations are developed to meet local needs. Data are assembled from other 
sources, such as research information, production records, and field experience of 
specialists. For example, data on crop yields under defined levels of management 
are assembled from farm records and from field or plot experiments on the same 
kinds of soil.
Predictions about soil behavior are based not only on soil properties but also on 
such variables as climate and biological activity. Soil conditions are predictable over 
long periods of time, but they are not predictable from year to year. For example, 
soil scientists can predict with a fairly high degree of accuracy that a given soil will 
have a high water table within certain depths in most years, but they cannot predict 
that a high water table will always be at a specific level in the soil on a specific date.
After soil scientists located and identified the significant natural bodies of soil in the 
survey area, they drew the boundaries of these bodies on aerial photographs and 
Custom Soil Resource Report
6

Page 177

identified each as a specific map unit. Aerial photographs show trees, buildings, 
fields, roads, and rivers, all of which help in locating boundaries accurately.
Custom Soil Resource Report
7

Page 178

Soil Map
The soil map section includes the soil map for the defined area of interest, a list of 
soil map units on the map and extent of each map unit, and cartographic symbols 
displayed on the map. Also presented are various metadata about data used to 
produce the map, and a description of each soil map unit.
8

Page 179

9
Custom Soil Resource Report
Soil Map
4646400 4646420 4646440 4646460 4646480 4646500 4646520 4646540 4646560 4646580
4646420 4646440 4646460 4646480 4646500 4646520 4646540 4646560 4646580
683580 683600 683620 683640 683660 683680 683700
683580 683600 683620 683640 683660 683680 683700
41°  56' 59'' N
72°  47' 6'' W
41°  56' 59'' N
72°  47' 0'' W
41°  56' 53'' N
72°  47' 6'' W
41°  56' 53'' N
72°  47' 0'' WN
Map projection: Web Mercator   Corner coordinates: WGS84   Edge tics: UTM Zone 18N WGS84
0 40 80 160 240
Feet
0 10 20 40 60
Meters
Map Scale: 1:910 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.

Page 180

MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at 
1:12,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause 
misunderstanding of the detail of mapping and accuracy of soil 
line placement. The maps do not show the small areas of 
contrasting soils that could have been shown at a more detailed 
scale.
Please rely on the bar scale on each map sheet for map 
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL: 
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator 
projection, which preserves direction and shape but distorts 
distance and area. A projection that preserves area, such as the 
Albers equal-area conic projection, should be used if more 
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as 
of the version date(s) listed below.
Soil Survey Area: State of Connecticut, Western Part
Survey Area Data: Version 6, Sep 16, 2025
Soil map units are labeled (as space allows) for map scales 
1:50,000 or larger.
Date(s) aerial images were photographed: Jun 14, 2022—Oct 6, 
2022
The orthophoto or other base map on which the soil lines were 
compiled and digitized probably differs from the background 
imagery displayed on these maps. As a result, some minor 
shifting of map unit boundaries may be evident.
Custom Soil Resource Report
10

Page 181

Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
29A Agawam fine sandy loam, 0 to 3 
percent slopes
1.0 47.2%
38E Hinckley loamy sand, 15 to 45 
percent slopes
1.1 52.8%
Totals for Area of Interest 2.1 100.0%
Map Unit Descriptions
The map units delineated on the detailed soil maps in a soil survey represent the 
soils or miscellaneous areas in the survey area. The map unit descriptions, along 
with the maps, can be used to determine the composition and properties of a unit.
A map unit delineation on a soil map represents an area dominated by one or more 
major kinds of soil or miscellaneous areas. A map unit is identified and named 
according to the taxonomic classification of the dominant soils. Within a taxonomic 
class there are precisely defined limits for the properties of the soils. On the 
landscape, however, the soils are natural phenomena, and they have the 
characteristic variability of all natural phenomena. Thus, the range of some 
observed properties may extend beyond the limits defined for a taxonomic class. 
Areas of soils of a single taxonomic class rarely, if ever, can be mapped without 
including areas of other taxonomic classes. Consequently, every map unit is made 
up of the soils or miscellaneous areas for which it is named and some minor 
components that belong to taxonomic classes other than those of the major soils.
Most minor soils have properties similar to those of the dominant soil or soils in the 
map unit, and thus they do not affect use and management. These are called 
noncontrasting, or similar, components. They may or may not be mentioned in a 
particular map unit description. Other minor components, however, have properties 
and behavioral characteristics divergent enough to affect use or to require different 
management. These are called contrasting, or dissimilar, components. They 
generally are in small areas and could not be mapped separately because of the 
scale used. Some small areas of strongly contrasting soils or miscellaneous areas 
are identified by a special symbol on the maps. If included in the database for a 
given area, the contrasting minor components are identified in the map unit 
descriptions along with some characteristics of each. A few areas of minor 
components may not have been observed, and consequently they are not 
mentioned in the descriptions, especially where the pattern was so complex that it 
was impractical to make enough observations to identify all the soils and 
miscellaneous areas on the landscape.
The presence of minor components in a map unit in no way diminishes the 
usefulness or accuracy of the data. The objective of mapping is not to delineate 
pure taxonomic classes but rather to separate the landscape into landforms or 
landform segments that have similar use and management requirements. The 
delineation of such segments on the map provides sufficient information for the 
development of resource plans. If intensive use of small areas is planned, however, 
Custom Soil Resource Report
11

Page 182

onsite investigation is needed to define and locate the soils and miscellaneous 
areas.
An identifying symbol precedes the map unit name in the map unit descriptions. 
Each description includes general facts about the unit and gives important soil 
properties and qualities.
Soils that have profiles that are almost alike make up a soil series. Except for 
differences in texture of the surface layer, all the soils of a series have major 
horizons that are similar in composition, thickness, and arrangement.
Soils of one series can differ in texture of the surface layer, slope, stoniness, 
salinity, degree of erosion, and other characteristics that affect their use. On the 
basis of such differences, a soil series is divided into soil phases. Most of the areas 
shown on the detailed soil maps are phases of soil series. The name of a soil phase 
commonly indicates a feature that affects use or management. For example, Alpha 
silt loam, 0 to 2 percent slopes, is a phase of the Alpha series.
Some map units are made up of two or more major soils or miscellaneous areas. 
These map units are complexes, associations, or undifferentiated groups.
A complex consists of two or more soils or miscellaneous areas in such an intricate 
pattern or in such small areas that they cannot be shown separately on the maps. 
The pattern and proportion of the soils or miscellaneous areas are somewhat similar 
in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example.
An association is made up of two or more geographically associated soils or 
miscellaneous areas that are shown as one unit on the maps. Because of present 
or anticipated uses of the map units in the survey area, it was not considered 
practical or necessary to map the soils or miscellaneous areas separately. The 
pattern and relative proportion of the soils or miscellaneous areas are somewhat 
similar. Alpha-Beta association, 0 to 2 percent slopes, is an example.
An undifferentiated group is made up of two or more soils or miscellaneous areas 
that could be mapped individually but are mapped as one unit because similar 
interpretations can be made for use and management. The pattern and proportion 
of the soils or miscellaneous areas in a mapped area are not uniform. An area can 
be made up of only one of the major soils or miscellaneous areas, or it can be made 
up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example.
Some surveys include miscellaneous areas. Such areas have little or no soil 
material and support little or no vegetation. Rock outcrop is an example.
Custom Soil Resource Report
12

Page 183

State of Connecticut, Western Part
29A—Agawam fine sandy loam, 0 to 3 percent slopes
Map Unit Setting
National map unit symbol: 2tyqw
Landscape: Valleys, outwash plains
Elevation: 0 to 1,040 feet
Mean annual precipitation: 36 to 71 inches
Mean annual air temperature: 39 to 55 degrees F
Frost-free period: 140 to 250 days
Farmland classification: All areas are prime farmland
Map Unit Composition
Agawam and similar soils: 85 percent
Minor components: 15 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Agawam
Setting
Landscape: Valleys, outwash plains
Landform: Moraines, Kames, Kame terraces, Outwash plains, Outwash terraces
Landform position (two-dimensional): Summit, shoulder, backslope, footslope
Landform position (three-dimensional): Side slope, crest, riser, tread, rise, dip
Down-slope shape: Convex
Across-slope shape: Convex
Parent material: Coarse-loamy eolian deposits over sandy and gravelly 
glaciofluvial deposits derived from gneiss, granite, schist, and/or phyllite
Typical profile
Ap - 0 to 11 inches: fine sandy loam
Bw1 - 11 to 16 inches: fine sandy loam
Bw2 - 16 to 26 inches: fine sandy loam
2C1 - 26 to 39 inches: loamy fine sand
2C2 - 39 to 55 inches: loamy fine sand
2C3 - 55 to 65 inches: loamy sand
Properties and qualities
Slope: 0 to 3 percent
Depth to restrictive feature: 15 to 35 inches to strongly contrasting textural 
stratification
Drainage class: Well drained
Runoff class: Very low
Capacity of the most limiting layer to transmit water (Ksat): Moderately low to high 
(0.14 to 14.17 in/hr)
Depth to water table: More than 80 inches
Frequency of flooding: None
Frequency of ponding: None
Maximum salinity: Nonsaline (0.0 to 1.9 mmhos/cm)
Available water supply, 0 to 60 inches: Low (about 3.4 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 2s
Custom Soil Resource Report
13

Page 184

Hydrologic Soil Group: B
Ecological site: F145XY008MA - Dry Outwash
Hydric soil rating: No
Minor Components
Ninigret
Percent of map unit: 5 percent
Landscape: Valleys
Landform: Terraces
Down-slope shape: Linear
Across-slope shape: Concave
Hydric soil rating: No
Windsor
Percent of map unit: 4 percent
Landscape: Valleys
Landform: Dunes, Deltas, Outwash terraces, Outwash plains
Landform position (three-dimensional): Tread, riser
Down-slope shape: Convex, linear
Across-slope shape: Convex, linear
Hydric soil rating: No
Walpole
Percent of map unit: 3 percent
Landscape: Outwash plains
Landform: Deltas, Depressions, Outwash terraces, Depressions, Outwash plains
Landform position (two-dimensional): Toeslope
Landform position (three-dimensional): Tread, talf, dip
Down-slope shape: Concave
Across-slope shape: Concave
Hydric soil rating: Yes
Hinckley
Percent of map unit: 3 percent
Landscape: Outwash plains, valleys
Landform: Deltas, Kames, Eskers, Outwash plains
Landform position (two-dimensional): Summit, shoulder, backslope
Landform position (three-dimensional): Head slope, nose slope, side slope, crest, 
rise
Down-slope shape: Convex
Across-slope shape: Convex, linear
Hydric soil rating: No
38E—Hinckley loamy sand, 15 to 45 percent slopes
Map Unit Setting
National map unit symbol: 2svmj
Landscape: Uplands, valleys
Elevation: 0 to 1,280 feet
Mean annual precipitation: 36 to 71 inches
Custom Soil Resource Report
14

Page 185

Mean annual air temperature: 39 to 55 degrees F
Frost-free period: 140 to 240 days
Farmland classification: Not prime farmland
Map Unit Composition
Hinckley and similar soils: 85 percent
Minor components: 15 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Hinckley
Setting
Landscape: Uplands, valleys
Landform: Eskers, Kames, Outwash deltas, Outwash terraces, Moraines, 
Outwash plains, Kame terraces
Landform position (two-dimensional): Backslope
Landform position (three-dimensional): Head slope, nose slope, side slope, crest, 
riser
Down-slope shape: Concave, convex, linear
Across-slope shape: Convex, linear, concave
Parent material: Sandy and gravelly glaciofluvial deposits derived from gneiss 
and/or granite and/or schist
Typical profile
Oe - 0 to 1 inches: moderately decomposed plant material
A - 1 to 8 inches: loamy sand
Bw1 - 8 to 11 inches: gravelly loamy sand
Bw2 - 11 to 16 inches: gravelly loamy sand
BC - 16 to 19 inches: very gravelly loamy sand
C - 19 to 65 inches: very gravelly sand
Properties and qualities
Slope: 15 to 45 percent
Depth to restrictive feature: More than 80 inches
Drainage class: Excessively drained
Runoff class: Low
Capacity of the most limiting layer to transmit water (Ksat): Moderately high to 
very high (1.42 to 99.90 in/hr)
Depth to water table: More than 80 inches
Frequency of flooding: None
Frequency of ponding: None
Maximum salinity: Nonsaline (0.0 to 1.9 mmhos/cm)
Available water supply, 0 to 60 inches: Low (about 3.1 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 7e
Hydrologic Soil Group: A
Ecological site: F144AY022MA - Dry Outwash
Hydric soil rating: No
Minor Components
Windsor
Percent of map unit: 5 percent
Landscape: Uplands, valleys
Custom Soil Resource Report
15

Page 186

Landform: Eskers, Kames, Moraines, Outwash deltas, Outwash terraces, 
Outwash plains, Kame terraces
Landform position (two-dimensional): Backslope
Landform position (three-dimensional): Head slope, nose slope, side slope, crest, 
riser
Down-slope shape: Concave, convex, linear
Across-slope shape: Convex, linear, concave
Hydric soil rating: No
Merrimac
Percent of map unit: 5 percent
Landscape: Valleys, outwash plains
Landform: Outwash plains, Outwash terraces, Moraines, Eskers, Kames
Landform position (two-dimensional): Backslope
Landform position (three-dimensional): Head slope, nose slope, side slope, crest, 
riser
Down-slope shape: Convex
Across-slope shape: Convex
Hydric soil rating: No
Agawam
Percent of map unit: 3 percent
Landscape: Uplands, valleys
Landform: Eskers, Kame terraces, Outwash deltas, Outwash terraces, Moraines, 
Kames, Outwash plains
Landform position (two-dimensional): Backslope
Landform position (three-dimensional): Head slope, nose slope, side slope, crest, 
riser
Down-slope shape: Concave, convex, linear
Across-slope shape: Convex, linear, concave
Hydric soil rating: No
Sudbury
Percent of map unit: 2 percent
Landscape: Valleys, uplands
Landform: Kames, Eskers, Outwash deltas, Outwash plains, Kame terraces, 
Outwash terraces, Moraines
Landform position (two-dimensional): Backslope, footslope
Landform position (three-dimensional): Base slope, tread
Down-slope shape: Concave, linear
Across-slope shape: Linear, concave
Hydric soil rating: No
Custom Soil Resource Report
16

Page 187

References
American Association of State Highway and Transportation Officials (AASHTO). 
2004. Standard specifications for transportation materials and methods of sampling 
and testing. 24th edition.
American Society for Testing and Materials (ASTM). 2005. Standard classification of 
soils for engineering purposes. ASTM Standard D2487-00.
Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of 
wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife 
Service FWS/OBS-79/31.
Federal Register. July 13, 1994. Changes in hydric soils of the United States.
Federal Register. September 18, 2002. Hydric soils of the United States.
Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric 
soils in the United States.
National Research Council. 1995. Wetlands: Characteristics and boundaries.
Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. 
U.S. Department of Agriculture Handbook 18. http://www.nrcs.usda.gov/wps/portal/
nrcs/detail/national/soils/?cid=nrcs142p2_054262 
Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for 
making and interpreting soil surveys. 2nd edition. Natural Resources Conservation 
Service, U.S. Department of Agriculture Handbook 436. http://
www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053577 
Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of 
Agriculture, Natural Resources Conservation Service. http://
www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053580 
Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and 
Delaware Department of Natural Resources and Environmental Control, Wetlands 
Section.
United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of 
Engineers wetlands delineation manual. Waterways Experiment Station Technical 
Report Y-87-1.
United States Department of Agriculture, Natural Resources Conservation Service. 
National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/
home/?cid=nrcs142p2_053374 
United States Department of Agriculture, Natural Resources Conservation Service. 
National range and pasture handbook. http://www.nrcs.usda.gov/wps/portal/nrcs/
detail/national/landuse/rangepasture/?cid=stelprdb1043084 
17

Page 188

United States Department of Agriculture, Natural Resources Conservation Service. 
National soil survey handbook, title 430-VI. http://www.nrcs.usda.gov/wps/portal/
nrcs/detail/soils/scientists/?cid=nrcs142p2_054242 
United States Department of Agriculture, Natural Resources Conservation Service. 
2006. Land resource regions and major land resource areas of the United States, 
the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 
296. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?
cid=nrcs142p2_053624 
United States Department of Agriculture, Soil Conservation Service. 1961. Land 
capability classification. U.S. Department of Agriculture Handbook 210. http://
www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf 
Custom Soil Resource Report
18

Page 189

Geotechnical Report 
Vessel Residential 
37 Hartford Avenue  
Granby, Connecticut 
Submitted to: 
Vessel Technologies, Inc. 
46 West 55 th  Street 
New York, NY 10019 
Submitted by: 
GEI Consultants, Inc. 
455 Winding Brook Drive, Suite 201 
Glastonbury, CT  06033 
860-368-5300 
February 16, 2023 
Project No. 2204905 
 
 
 
 
  
 
 
 Thomas Rezzani, E.I.T.  
 Geotechnical Professional 
  
 
 
Matthew Glunt, P.E.  
Senior Geotechnical Engineer 
Consulting 
Engineers and 
Scientists 

Page 190

G E O T E C H N I C A L  R E P O R T  
V E S S E L  R E S I D E N T I A L  
G R A N B Y ,  C O N N E C T I C U T  
F E B R U A R Y  1 6 ,  2 0 2 3  
GEI Consultants, Inc.   i 
Table of Contents 
1.  Introduction 1 
1.1  Project Summary 1 
1.2  Scope of Services 1 
1.3  Authorization 1 
2.  Site and Project Description 2 
2.1  Site Description and History 2 
2.2  Proposed Construction 2 
3.  Exploration Procedures 3 
3.1  Test Borings 3 
3.2  Monitoring Well Installation 3 
3.3  Laboratory Testing 3 
4.  Subsurface Conditions 4 
4.1  Geologic Setting 4 
4.2  Subsurface Conditions 4 
4.3  Groundwater Conditions 4 
5.  Design Recommendations 5 
5.1  Foundation Design 5 
5.2  Settlement 5 
5.3  Seismic Design 6 
5.4  Lateral Earth Pressures 6 
5.5  Pavement Design 7 
5.6  Subsurface Drainage Design 8 
6.  Construction Considerations 10  
6.1  Subgrade Preparation 10  
6.1.1  General 10  
6.1.2  Pavements 10  
6.1.3  Foundations 11  
6.2  Excavation and Dewatering 11  
6.3  Freezing Conditions 11  
6.4  Backfilling and Compaction 12  
7.  Closure 13  
7.1  Follow-on Services 13  
7.2  Limitations 13  
 
 
 
 
 
 

Page 191

G E O T E C H N I C A L  R E P O R T  
V E S S E L  R E S I D E N T I A L  
G R A N B Y ,  C O N N E C T I C U T  
F E B R U A R Y  1 6 ,  2 0 2 3  
 
 
GEI Consultants, Inc.   ii   
Figures 
1 Boring Location Plan 
 
Appendices 
A Boring and Monitoring Well Logs 
B Laboratory Test Results 
C Recommended Material Specifications 
D Infiltration/Permeability Testing Results  

Page 192

G E O T E C H N I C A L  R E P O R T  
V E S S E L  R E S I D E N T I A L  
G R A N B Y ,  C O N N E C T I C U T  
F E B R U A R Y  1 6 ,  2 0 2 3  
 
 
GEI Consultants, Inc.   1  
1.  Introduction 
1.1 Project Summary 
The approximately 2.55-acre site slated for development is located at 37 Hartford Avenue in 
Granby, Connecticut.   
We understand that the project will consist of forty-eight (48) prefabricated residential units 
stacked evenly over four floors, with a footprint of 8,591 square feet. The appurtenant site 
features include a parking area, access drive, and storm water management. 
This report was prepared to address foundation and site preparation recommendations for the 
proposed construction. 
1.2 Scope of Services 
Our scope of work included the following tasks:   
 
• Engaged a subcontractor to drill three (3) test borings on the property to depths of 
22 feet each. 
• Observed soil samples recovered from the test borings and prepared test boring 
logs. 
• Installation of two (2) temporary monitoring wells to depths of 8 feet each and 
conducted downhole infiltration testing within each. 
• Engaged a testing laboratory to perform three (3) grain-size analyses on soil 
samples to verify visual classification and evaluate subsurface conditions 
regarding infiltration capacity. 
• Developed recommendations for site preparation, pavement sections, excavation, 
backfill, seismic design, lateral wall pressures, foundation design, infiltration rate, 
and construction considerations. 
• Prepared this Geotechnical Report.  
1.3 Authorization 
Our work was performed in general accordance with our proposal dated December 15, 2022, 
and our Standard Professional Services agreement executed December 21, 2022.  

Page 193

G E O T E C H N I C A L  R E P O R T  
V E S S E L  R E S I D E N T I A L  
G R A N B Y ,  C O N N E C T I C U T  
F E B R U A R Y  1 6 ,  2 0 2 3  
 
 
GEI Consultants, Inc.   2  
2.  Site and Project Description 
2.1 Site Description and History 
The property slated for development is a semi-vacant 2.55-acre lot located at 37 Hartford 
Ave. in Granby, Connecticut.  The site is bounded by Hartford Ave (Route 189) to the north, 
undeveloped land to the south, and commercial properties to the east and west.   
 
The site currently includes a partially finished walkout lower level with concrete walls and 
slab-on-grade.  From a cursory review of aerial photographs, we understand this lot formerly 
housed a small residence within the approximate footprint of the current walls, which was 
demolished in or about 2006.  The lower level currently on the site was constructed in or 
about 2010, with the remainder of the structure never completed.  The site also includes soil 
stockpiles which, we assume, are remnant of the lower-level excavation.  
2.2 Proposed Construction 
Our current understanding of the project is based on the information provided to GEI as 
shown on the Sketch Plan print dated 10/28/2022, as detailed below.  
 
We understand that the project involves construction of a four-story residential building 
consisting of stacked prefabricated units with a footprint of 8,591-sf.  We also understand the 
structure will likely be founded on a series of grade beams supporting load-bearing walls and 
an elevated cold-formed metal panel floor.  Site grading is expected to largely follow existing 
contours, with most areas of improvement requiring cuts and fills less than 5 feet.   
 
Preliminary plans provided to GEI show construction of 62 parking spaces to the south of the 
building.  Stormwater management is expected to consist of a series of subsurface chambers 
installed below the southern portion of the parking area.    
 

Page 194

G E O T E C H N I C A L  R E P O R T  
V E S S E L  R E S I D E N T I A L  
G R A N B Y ,  C O N N E C T I C U T  
F E B R U A R Y  1 6 ,  2 0 2 3  
 
 
GEI Consultants, Inc.   3  
3.  Exploration Procedures 
3.1 Test Borings 
The boring locations were laid out on the site from the provided conceptual plan using 
handheld GPS.  Borings were located within the proposed building footprint. Approximate 
boring locations relative to the property boundary and conceptual site plan are shown on 
Figure 1.  
 
Three (3) soil test borings (B-1 through B-3) were performed at the site on January 12, 2023, 
by Seaboard Drilling Inc., under subcontract to GEI.  The appropriate one-call utility location 
service (Call Before You Dig) was contacted prior to our arrival.  All borings were advanced 
to depths of 22 feet using hollow-stem augering techniques and a track-mounted drilling rig.  
Boring logs are attached in Appendix A.  
 
Standard Penetration Testing (SPT) and split-spoon sampling were performed continuously 
through the upper 8 feet of the borings and at 5-foot intervals thereafter using a 140-pound 
automatic hammer.  Representative samples of the soils obtained by the sampler were 
classified by the on-site GEI engineer.  The samples were placed in appropriately identified 
sealed glass jars and transported to our office for laboratory assignment.  Borings were 
backfilled with drill cuttings upon completion. 
3.2 Monitoring Well Installation 
Two (2) temporary PVC wells (MW-1 and MW-2) were installed on the southern portion of 
the site.  The well installation logs are attached in Appendix A for reference.   
 
Falling-head measurements were conducted within the wells until stabilized readings were 
noted, the results of which are attached in Appendix D. 
3.3 Laboratory Testing 
Laboratory testing was conducted on representative soil samples to confirm field 
identification of the soils and establish engineering characteristics for design.  Tests 
performed by GeoTesting Express, under subcontract to GEI, included the following: 
 
• Three (3) grain-size analysis with standard sieve set (ASTM D6913) 
• Three (3) moisture content analyses (ASTM D2216) 
 
Results of the laboratory testing program are included in Appendix B. 

Page 195

G E O T E C H N I C A L  R E P O R T  
V E S S E L  R E S I D E N T I A L  
G R A N B Y ,  C O N N E C T I C U T  
F E B R U A R Y  1 6 ,  2 0 2 3  
 
 
GEI Consultants, Inc.   4  
4.  Subsurface Conditions 
4.1 Geologic Setting 
The Surficial Geology Map of Connecticut (Stone et al., 1992) indicates that this area of 
Granby lies on a broad plain of glacial outwash sands over fine-grained deposits. 
4.2 Subsurface Conditions 
The generalized subsurface conditions at the site are described below, in order of increasing 
depth.  The subsurface conditions between boring locations may differ.  The nature and 
extent of variations between the sampling points will not become evident until construction.   
 
Topsoil  – Topsoil thickness on the site was generally measured as 8 to 13 inches, with a 
thicker zone of approximately 30 inches noted at boring B-3.   
 
Native Sand  – Thick, stratified deposits of glacial outwash sand were encountered to 
termination depth of the borings.  Below the topsoil, these sands were generally sampled as 
fine to coarse-grained reddish-brown sand with up to 15 percent non-plastic fines.  Gravel 
content, up to 20 percent, was more apparent in the near-surface sampling. 
 
Standard Penetration Test (SPT) N-values typically ranged between 9 to 14 blows/foot, 
indicating loose to medium-dense conditions. 
4.3 Groundwater Conditions 
Groundwater was not encountered in the test borings or wells to a maximum investigation 
depth of 22 feet.  
 
Groundwater levels are subject to seasonal and weather-related variations.  Groundwater 
measurements made at different times and different locations may be significantly different 
than the measurements taken as part of this investigation.   

Page 196

G E O T E C H N I C A L  R E P O R T  
V E S S E L  R E S I D E N T I A L  
G R A N B Y ,  C O N N E C T I C U T  
F E B R U A R Y  1 6 ,  2 0 2 3  
 
 
GEI Consultants, Inc.   5  
5.  Design Recommendations 
5.1 Foundation Design 
The proposed structure may be supported on shallow foundations bearing on a subgrade 
consisting of native sands or compacted Structural Fill.  If existing remnant fills are 
encountered within the building pad during foundation installation, these soils must be 
removed and replaced with compacted Structural Fill or, alternatively, crushed stone.  We 
recommend that all footing subgrades be evaluated by a GEI representative prior to concrete 
placement. 
The maximum allowable bearing pressures for the design of footings are: 
 
Table 1:  Allowable Bearing Pressure 
Bearing Stratum Net Allowable  Bearing Pressure  
Crushed Stone over Native 
Sands or Structural Fill 3,000 lb/ft 2 
 
Minimum individual column footing and wall footing widths should be at least 36 and 18 
inches, respectively.  Exterior footings should bear at least 3½ feet below the adjacent 
exterior grade for frost protection. Interior footings should be founded at least 18 inches 
below the bottom of the floor slab.  The tops of all footings should be at least 6 inches below 
the bottom of the overlying floor slab.  
 
As shown on conceptual plans, we recommend that the grade beams bear on a minimum 6-
inch working pad of crushed stone wrapped on the sides by a geotextile fabric, placed over a 
soil subgrade prepared in accordance with Section 6.1.  This will serve to protect subgrades 
and improve expediency of foundation construction.  Crushed Stone meeting the 
specifications in Appendix C may be considered non-frost susceptible.   
5.2 Settlement 
We understand structure loads on the 18-inch-wide grade beams will be on the order of 3.5 
kips/ft.  Assuming the design and construction recommendations herein are followed, we 
estimate total settlement of the building will be less than 1 inch, and differential settlement 
will be less than ½ inch.  We expect nearly all expected settlements will occur during 
construction or soon after. 

Page 197

G E O T E C H N I C A L  R E P O R T  
V E S S E L  R E S I D E N T I A L  
G R A N B Y ,  C O N N E C T I C U T  
F E B R U A R Y  1 6 ,  2 0 2 3  
 
 
GEI Consultants, Inc.   6  
5.3 Seismic Design 
The 2018 edition of the Connecticut Building Code document mirrors the 2015 International 
Building Code, with exception of the revisions and supplemental information provided by 
state building officials.   
 
Based on the criteria of Building Code Section 1613.3.2 and the SPT N-values measured on 
site, we recommend the use of Site Class D for seismic design.  The Site Class was used in 
conjunction with the seismic hazard (SS, S 1) for this location to determine spectral design 
values, as follows:  
 
Table 2:  Seismic Design Values 
2018 Connecticut Building Code  
SS 0.171 g 
S1 0.054 g 
SDS  0.183 g 
SD1  0.087 g 
PGA M 0.144 g 
Seismic Design Category 
(Risk Category I, II, or III) 
B 
 
We calculated the spectral response parameters for the site using general procedures outlined 
in Building Code Section 1613.3.  Peak ground acceleration (PGA M) is adjusted for Site 
Class effects, per ASCE 7-10 Section 11.8.3. 
 
The soils below the foundation level at this site are not considered susceptible to liquefaction.  
5.4 Lateral Earth Pressures 
All earth retaining structures used on the project should be designed using the earth pressures 
shown in Table 3.  Note that no factor of safety has been applied to these values.  Below-
grade walls that are restrained from movement should be designed for at-rest earth pressures.  
Retaining walls free to rotate at the top should be designed for active earth pressures.  In 
addition to the lateral loads exerted by the soil against the walls, allowance should be 
included for lateral stresses imposed by any temporary or long-term surcharge loads, such as 
cars or trucks adjacent to the walls or adjacent footing loads. 
 
 
 

Page 198

G E O T E C H N I C A L  R E P O R T  
V E S S E L  R E S I D E N T I A L  
G R A N B Y ,  C O N N E C T I C U T  
F E B R U A R Y  1 6 ,  2 0 2 3  
 
 
GEI Consultants, Inc.   7  
Table 3:  Wall Design Parameters 
Material 
Total 
Unit 
Weight 
(γ, pcf) 
Friction  
Angle 
(Φ) 
Cohesion 
(c)  
At-Rest Earth 
Pressure 
Coeff 
(K o) 
Active 
Earth 
Pressure 
Coeff, 
(K a) 
Passive 
Earth 
Pressure 
Coeff, 
(K p) 
Native Sands 120 34º 0 0.44 0.28 3.00 
Structural Fill 125 34º 0 0.44 0.28 3.00 
 
We recommend limiting the passive pressure coefficient to 3.00 as shown above, due to the 
relatively high movement required to fully engage passive resistance.  The minimum factors 
of safety for sliding and overturning under static loads should be 1.5 and 2.0, respectively.  
An allowable coefficient of friction of 0.50 between the grade beam and crushed stone over 
granular bearing soil may be assumed. 
 
The recommended wall design parameters do not consider the development of hydrostatic 
pressure behind the walls.  As such, positive wall drainage must be provided for all earth 
retaining structures.  These drainage systems can be constructed of open-graded washed 
stone isolated from the soil backfill with a geosynthetic filter fabric and drained by perforated 
pipe, or several wall drainage products made specifically for this application.  Where backfill 
soils are not drained using an appropriately designed drainage system, the lateral soil pressure 
on proposed retaining walls must consider hydrostatic forces and submerged soil unit weight.   
 
The earth pressures given in Table 3 assume placement and compaction of the backfill in 
accordance with recommendations elsewhere in this report.  Compact backfill directly behind 
walls with light, hand-operated compactors.  Heavy compactors and grading equipment should 
not be allowed to operate within 10 feet of the walls during backfilling to avoid developing 
excessive temporary or long-term lateral soil pressures. 
5.5 Pavement Design 
Soils similar to the native sands at the site, as well as any new structural fill, are generally 
considered to be well-suited to support of pavements, assuming the subgrade is prepared as 
recommended in this report.   
 
The south tenant parking area may be designed with light-duty pavements, while those areas 
expected to receive repeated truck traffic, such as dumpster pads, should be designed as a 
rigid pavement section.  We recommend the following pavement sections for these areas:  
 
 
 
 

Page 199

G E O T E C H N I C A L  R E P O R T  
V E S S E L  R E S I D E N T I A L  
G R A N B Y ,  C O N N E C T I C U T  
F E B R U A R Y  1 6 ,  2 0 2 3  
 
 
GEI Consultants, Inc.   8  
Light-Duty Parking Area  
3.0 inches bituminous concrete  
• 1.5 inches wearing course (CTDOT M.04.03 Class 2 or Superpave HMA 
S0.5) 
• 1.5 inches binder course (CTDOT M.04.03 Class 1 or Superpave HMA S1.0) 
8.0 inches of processed aggregate base (CTDOT Form 818 M05.01) 
 
Heavy-Duty Rigid Concrete Section  
6.0 inches of 4,000-psi jointed concrete (CTDOT M.03.01 Portland Cement) 
8.0 inches of processed aggregate base (CTDOT Form 818 M05.01) 
 
Recommended pavement sections are based on AASHTO Guide for Design of Pavement 
Structures (1993) and ACI 330R.  Pavement materials should conform with and be placed in 
accordance with the Connecticut Department of Transportation (CTDOT) Standard 
Specifications for Road, Bridges, and Incidental Construction (Form 818), 2020.   CTDOT-
compliant reclaimed miscellaneous aggregate with a loss on abrasion of less than 50 percent 
may be used as base course for pavements. 
 
Rigid pavement sections should be designed and constructed in accordance with appropriate 
American Concrete Institute (ACI) recommendations and with the applicable specifications 
of the CTDOT Standard Specifications.  An adequate number of smooth steel dowels should 
be provided at all control and construction joints.  All dowels should be coated and lubricated 
and affixed with metal or plastic caps.  The size and spacing of dowels should conform to 
recommendations in ACI 330R.  All joints should also be sealed with a flexible fuel resistant 
sealer to minimize surface water infiltration into the prepared base.  
 
According to AASHTO design guidelines, the recommended pavement sections shown 
above are suitable for a 20-year design life.  However, pavement maintenance such as sealing 
of cracks and localized patching due to normal weathering should be expected within the first 
5 to 10 years of life. 
5.6 Subsurface Drainage Design 
We understand below-ground infiltration chambers will likely be constructed on the property 
for stormwater management purposes.  Based on the results of the investigation, these 
systems will likely be founded in highly permeable sand deposits.  Based on the investigation 
data, groundwater appears to be in excess of 20 feet below present grade.   
 
Hydraulic conductivities at the monitoring well locations (MW-1 and MW-2) were estimated 
using downhole falling-head field measurements and published equations for borehole 
permeability.  The calculations presented in Appendix D are consistent with highly 
permeable soil.  Though the field-measured data indicate infiltration rates of over 100 

Page 200

G E O T E C H N I C A L  R E P O R T  
V E S S E L  R E S I D E N T I A L  
G R A N B Y ,  C O N N E C T I C U T  
F E B R U A R Y  1 6 ,  2 0 2 3  
 
 
GEI Consultants, Inc.   9  
inches/hour, we recommend assuming an infiltration rate of  40.0 inches/hour  for stormwater 
system design.  Per CT DEEP regulations, a factor of safety of 2.0 must be applied to this 
value for design. 
 
  

Page 201

G E O T E C H N I C A L  R E P O R T  
V E S S E L  R E S I D E N T I A L  
G R A N B Y ,  C O N N E C T I C U T  
F E B R U A R Y  1 6 ,  2 0 2 3  
 
 
GEI Consultants, Inc.   10   
6.  Construction Considerations 
6.1 Subgrade Preparation 
6.1.1 General 
To prepare the site for grading operations, topsoil, organic matter, and other deleterious 
material should be stripped from the building and site improvement areas.  Soft, wet, loose, 
or otherwise un-suitable soils should be removed and replaced, or potentially re-compacted 
in-place. 
 
Site preparations should also include the removal of all soil stockpiles and other above-
ground features remnant of the partially-constructed building on site.  Subject to further 
evaluation, these soils can be potentially beneficially re-used on the project. 
6.1.2 Site Demolition 
Any foundation remnants within the proposed building pad should be removed and the entire 
footprint backfilled to grade with Structural Fill.  Below-grade elements such as foundation 
walls may be left in place within pavement and landscaped areas, cut to at least 2 feet below 
the bottom of subgrade elevation to reduce the potential for a hard spot forming. 
 
Existing utilities to remain in use should be rerouted around the proposed building footprint.  If 
not removed, any pipes over 3 inches in diameter should be filled with flowable fill or grout.  
Otherwise, these pipes may serve as conduits for subsurface erosion resulting in formation of 
voids below foundations or floor slabs.  Where existing utilities are left in place and plugged in 
the building footprint, it may be necessary to undercut poorly compacted backfill to provide 
adequate support for footings or slabs. 
 
6.1.3 Pavements 
Following the required stripping, excavation to rough grade, and before placing new fill to 
achieve design grades, the resulting subgrade should be firm, stable, and unyielding.  
Stabilization, where required, may consist of removing unsuitable material and replacement 
with compacted structural fill, or where unsuitable soils are relatively thin, drying and 
compacting in place.    
 
Soil subgrades should be proof-rolled with at least four (4) passes of a minimum 10-ton 
vibratory roller in open areas, or a 1-ton vibratory roller or large plate compactor, such as 
Wacker DPU4545 or equivalent, in trenches.  Proof-rolling in close proximity to 
groundwater, if encountered, may need to be accomplished without vibratory action to reduce 
the potential for disturbance to the subgrade. 

Page 202

G E O T E C H N I C A L  R E P O R T  
V E S S E L  R E S I D E N T I A L  
G R A N B Y ,  C O N N E C T I C U T  
F E B R U A R Y  1 6 ,  2 0 2 3  
 
 
GEI Consultants, Inc.   11   
 
6.1.4 Foundations 
Footings should bear on a subgrade consisting of native sands or compacted Structural Fill.  
Bearing surfaces should be free of standing water, frost, and loose soil before placement of 
reinforcing steel and concrete. 
 
Historic fills associated with demolition of the former residence on the site or construction of 
the current basement may be encountered within the building pad.  If encountered, historic 
fills must be removed within foundation excavations and replaced with Structural Fill or, 
alternatively, crushed stone.   
 
We recommend that a GEI representative observe the final preparation of all subgrades prior 
to footing construction.  Subgrade soils that require undercutting should be replaced with 
either compacted structural fill or crushed stone. 
 
As shown on conceptual plans, we recommend that the grade beams bear on a minimum 6-
inch working pad of crushed stone wrapped on the sides by a geotextile fabric, placed over 
an approved soil subgrade.  This will serve to protect subgrades and improve expediency of 
foundation construction.  Crushed Stone meeting the specifications in Appendix C may be 
considered non-frost susceptible.   
6.2 Excavation and Dewatering 
Excavations can be accomplished with conventional earthmoving equipment.  Excavations 
should be sloped or shored in accordance with the local, state, and federal regulations, 
including Occupational Safety and Health Agency (OSHA 29 CFR Part 1926) excavation 
trench safety standards.   
 
Groundwater was not encountered during this investigation and is not likely to impact 
grading operations.  That said, site relief is very low, and maintaining proper site drainage 
during initial grading may become very difficult unless measures to control surface water are 
put in place before grading starts and maintained throughout.   
6.3 Freezing Conditions 
The native sands that will form the subgrades for grade slabs, footings, and pavements can be 
expected to have a low to moderate susceptibility to frost.  Accordingly, we do not believe 
that special measures beyond the design and construction recommendations provided herein 
are required to guard against potential frost heave of subgrade soils. 
 
That said, we recommend certain precautions for cold-weather earthwork.  All subgrades 
should be free of frost before placement of concrete.  Frost-susceptible soils that have frozen 

Page 203

G E O T E C H N I C A L  R E P O R T  
V E S S E L  R E S I D E N T I A L  
G R A N B Y ,  C O N N E C T I C U T  
F E B R U A R Y  1 6 ,  2 0 2 3  
 
 
GEI Consultants, Inc.   12   
should be removed and replaced with compacted Structural Fill.  The footing and the soil 
adjacent to the footing should be insulated until they are backfilled.  Soil placed as fill should 
be free of frost, as should the ground on which it is placed. 
 
If slabs-on-grade or footings are built and left exposed during the winter, precautions should 
be taken to prevent freezing of the underlying soil. 
6.4 Backfilling and Compaction 
Recommended specifications for gradation and compaction of backfill soils are provided in 
the attached recommended Material Specifications (Appendix C).   
 
Native sands excavated as part of earthwork activities can likely be re-used on site as 
Structural Fill or Ordinary Fill, provided they do not contain oversize, organic, or otherwise 
deleterious material and can meet the appropriate compaction requirements.   
 
Fill imported from off site should meet the attached gradation requirements.  Fill placed 
within the building limits, within a 3-foot-wide zone outside foundation walls, under 
pavements, and behind retaining walls should meet the compaction requirements for 
Structural Fill.  Backfill placed in non-structural areas should meet the compaction 
requirements for Ordinary Fill.  Proposed borrow materials that fall slightly outside of these 
specifications may also be suitable for use, subject to review and approval by GEI.     
 
 

Page 204

G E O T E C H N I C A L  R E P O R T  
V E S S E L  R E S I D E N T I A L  
G R A N B Y ,  C O N N E C T I C U T  
F E B R U A R Y  1 6 ,  2 0 2 3  
 
 
GEI Consultants, Inc.   13   
7.  Closure 
7.1 Follow-on Services 
We recommend that GEI be kept on the project through the final design and construction 
phases for the following services:    
      
 Review geotechnical-related contractor submittals and assist in developing responses 
to questions from the contractor (i.e. RFI’s). 
 Provide periodic site visits during construction to view subgrades and consult on 
geotechnical-related issues that occur.   
7.2 Limitations 
This report was prepared for the use of the project team, exclusively.  Our recommendations 
are based on the project information provided to us at the time of this report and may require 
modification if there are any changes in the nature, design, or location of the proposed 
building.  We cannot accept responsibility for designs based on our recommendations unless 
we are engaged to review the final plans and specifications to determine whether any changes 
in the project affect the validity of our recommendations, and whether our recommendations 
have been properly implemented in the design. 
 
Our professional services for this project have been performed in accordance with generally 
accepted engineering practices.  No warranty, expressed or implied, is made. 
 

Page 205

G E O T E C H N I C A L  R E P O R T  
V E S S E L  R E S I D E N T I A L  
G R A N B Y ,  C O N N E C T I C U T  
F E B R U A R Y  1 6 ,  2 0 2 3  
 
 
GEI Consultants, Inc.    
Figures 
 
  

Page 206

FIGURE NO.
GEI PROJECT NO: 2204905
BORING LOCATION PLAN
37 HARTFORD AVE
GRANBY, CT 1
LEGEND
APPROXIMATE BORING/MON. WELL LOCATION
B-3
B-1
B-2
SOURCE:
CONCEPT PLAN (CSP-A), H+H ENGINEERING ASSOC., 
10/28/2022
MW-1 MW-2

Page 207

G E O T E C H N I C A L  R E P O R T  
V E S S E L  R E S I D E N T I A L  
G R A N B Y ,  C O N N E C T I C U T  
F E B R U A R Y  1 6 ,  2 0 2 3  
 
 
GEI Consultants, Inc.    
Appendix A 
Boring and Monitoring Well Logs 
 
  

Page 208

NATIVE SAND
0
to
2
2
to
4
4
to
6
6
to
8
10
to
12
15
to
17
20
to
22
S1: WIDELY GRADED SAND WITH SILT (SW-SM); ~80% F-C
sand, ~10% NP fines, ~10% F-C gravel, brown, moist. TOPSOIL
S2: WIDELY GRADED SAND WITH GRAVEL (SW); 75.2% F-C
sand, 20.2% F-C gravel, 4.6% NP fines, brown, moist.
S3: Similar to S2.
S4: Similar to S2.
S5: WIDELY GRADED SAND WITH SILT (SW-SM); ~90% F-C
sand, ~10% NP fines, light-brown, moist.
S6: NARROWLY GRADED SAND WITH SILT (SP-SM); ~90%
F-C sand, ~10% NP fines, reddish-brown, moist.
S7: Similar to S6.
Planned depth.
Backfilled with drill cuttings.
S1
S2
S3
S4
S5
S6
S7
24/13
24/9
24/14
24/14
24/8
24/14
24/15
2-2-4-4
4-5-5-5
2-4-5-6
5-7-5-6
4-5-5-7
3-6-10-
12
8-12-13-
18
Sv = Pocket Torvane Shear Strength
PI = Plasticity Index
NA, NM = Not Applicable, Not Measured
Blows per 6 in.: 140-lb hammer falling
30 inches to drive a 2-inch-O.D.
split spoon sampler.
CORE BARREL I.D./O.D. NA / NADRILL ROD O.D.: NM
CASING I.D./O.D.: NA / NA
WATER LEVEL DEPTHS (ft): Free groundwater not encountered.
DRILLER NAME: J. Nitsch
C = Core Sample
S = Split Spoon Sample
U = Undisturbed Sample
SC = Sonic Core
CORE BARREL TYPE:
WOR = Weight of Rods
WOH = Weight of Hammer
DRILLING METHOD: Hollow Stem Auger
LL = Liquid Limit
PID = Photoionization Detector
Pen. = Penetration Length
Rec. = Recovery Length
BORING INFORMATION
AUGER I.D./O.D.: 3.75 inch / NA
Qp = Pocket Penetrometer Strength
I.D./O.D. = Inside Diameter/Outside Diameter
PAGE 1 of 1
B-1
DP = Direct Push Sample
HSA = Hollow-Stem Auger
TOTAL DEPTH (ft): 22.0
RQD = Rock Quality Designation
        = Length of Sound Cores>4 in / Pen.,%
HAMMER TYPE: Safety Hammer - semi-automatic
ABBREVIATIONS:
DRILLING INFORMATION
LOGGED BY: T. Yurman RIG TYPE: Diedrich D-50 ATV
Layer Name
Depth
(ft)
Soil and Rock Description
Sample Information
Sample
   No.
Pen./
Rec.
(in)
Blows
per 6 in.
or RQD
Depth
(ft)
5
10
15
20
Elev.
(ft)
200
190
Drilling Remarks/
Field Test Data
NOTES:  
 PROJECT NAME:   Vessel-Granby
GEI PROJECT NUMBER: 2204905
CITY/STATE: Granby, Connecticut
_GEI WOBURN STD 1-LOCATION-LAYER NAME  2204905 - VESSEL GRANBY.GPJ  GEI DATA TEMPLATE 2013.GDT  2/14/23
VERTICAL DATUM:
DATE START/END: 1/12/2023 - 1/12/2023
DRILLING COMPANY: Seaboard Drilling, Inc.
GROUND SURFACE EL. (ft): 205
LOCATION: See plan. BORING

Page 209

NATIVE SAND
0
to
2
2
to
4
4
to
6
6
to
8
10
to
12
15
to
17
20
to
22
S1: WIDELY GRADED SAND WITH SILT (SW-SM); ~85% F-C
sand, ~10% NP fines, ~5% F-C gravel, organic fibers brown,
moist.  TOPSOIL
S2: WIDELY GRADED SAND WITH GRAVEL (SW); 81.7% F-C
sand, 14.5% F-C gravel, 3.8% NP fines, reddish brown, moist.
S3: Similar to S2.
S4: NARROWLY GRADED SAND WITH SILT (SP-SM); ~80%
M-C sand, ~10% NP fines, ~10% F-C gravel, brown, moist.
S5: Similar to S4.
S6: SILTY SAND (SM); ~85% F-M sand, ~15% NP fines,
light-brown, moist.
S7: SILTY SAND (SM); ~85% F-sand, ~15% NP fines,
light-brown, moist.
Planned depth.
Backfilled with drill cuttings.
S1
S2
S3
S4
S5
S6
S7
24/8
24/14
24/17
24/16
24/14
24/18
24/15
2-3-3-3
6-7-6-7
3-3-3-3
3-5-6-8
5-5-6-6
5-6-8-8
4-5-8-9
Sv = Pocket Torvane Shear Strength
PI = Plasticity Index
NA, NM = Not Applicable, Not Measured
Blows per 6 in.: 140-lb hammer falling
30 inches to drive a 2-inch-O.D.
split spoon sampler.
CORE BARREL I.D./O.D. NA / NADRILL ROD O.D.: NM
CASING I.D./O.D.: NA / NA
WATER LEVEL DEPTHS (ft): Free groundwater not encountered.
DRILLER NAME: J. Nitsch
C = Core Sample
S = Split Spoon Sample
U = Undisturbed Sample
SC = Sonic Core
CORE BARREL TYPE:
WOR = Weight of Rods
WOH = Weight of Hammer
DRILLING METHOD: Hollow Stem Auger
LL = Liquid Limit
PID = Photoionization Detector
Pen. = Penetration Length
Rec. = Recovery Length
BORING INFORMATION
AUGER I.D./O.D.: 3.75 inch / NA
Qp = Pocket Penetrometer Strength
I.D./O.D. = Inside Diameter/Outside Diameter
PAGE 1 of 1
B-2
DP = Direct Push Sample
HSA = Hollow-Stem Auger
TOTAL DEPTH (ft): 22.0
RQD = Rock Quality Designation
        = Length of Sound Cores>4 in / Pen.,%
HAMMER TYPE: Safety Hammer - semi-automatic
ABBREVIATIONS:
DRILLING INFORMATION
LOGGED BY: T. Yurman RIG TYPE: Diedrich D-50 ATV
Layer Name
Depth
(ft)
Soil and Rock Description
Sample Information
Sample
   No.
Pen./
Rec.
(in)
Blows
per 6 in.
or RQD
Depth
(ft)
5
10
15
20
Elev.
(ft)
200
190
Drilling Remarks/
Field Test Data
NOTES:  
 PROJECT NAME:   Vessel-Granby
GEI PROJECT NUMBER: 2204905
CITY/STATE: Granby, Connecticut
_GEI WOBURN STD 1-LOCATION-LAYER NAME  2204905 - VESSEL GRANBY.GPJ  GEI DATA TEMPLATE 2013.GDT  2/14/23
VERTICAL DATUM:
DATE START/END: 1/12/2023 - 1/12/2023
DRILLING COMPANY: Seaboard Drilling, Inc.
GROUND SURFACE EL. (ft): 208
LOCATION: See plan. BORING

Page 210

NATIVE SAND
0
to
2
2
to
4
4
to
6
6
to
8
10
to
12
15
to
17
20
to
22
S1: WIDELY GRADED SAND WITH SILT (SW-SM); ~80% F-C
sand, ~10% NP fines, ~10% F-C gravel, some organic fibers,
reddish-brown, damp to moist.  TOPSOIL
S2A (0-6"): Similar to S1.
S2B (6-13"): SILTY SAND (SM); ~75% F-sand, ~25% NP-LP
fines, damp to moist, reddish-brown.
S3: SILTY SAND (SM); ~85% F-M sand, ~15% NP fines, moist,
reddish-brown, some LP fines at top of recovery.
S4: SILTY SAND (SM); 97.6% F-C sand, 2.4% NP fines,
light-brown, moist.
S5: Similar to S4.
S6: Similar to S4.
S7: Similar to S4.
Planned depth.
Backfilled with drill cuttings.
S1
S2
S3
S4
S5
S6
S6
24/12
24/13
24/18
24/18
24/17
24/23
24/19
1-3-4-5
6-9-6-5
3-5-5-5
4-6-8-8
4-6-7-9
4-7-6-7
5-6-8-9
Sv = Pocket Torvane Shear Strength
PI = Plasticity Index
NA, NM = Not Applicable, Not Measured
Blows per 6 in.: 140-lb hammer falling
30 inches to drive a 2-inch-O.D.
split spoon sampler.
CORE BARREL I.D./O.D. NA / NADRILL ROD O.D.: NM
CASING I.D./O.D.: NA / NA
WATER LEVEL DEPTHS (ft): Free groundwater not encountered.
DRILLER NAME: J. Nitsch
C = Core Sample
S = Split Spoon Sample
U = Undisturbed Sample
SC = Sonic Core
CORE BARREL TYPE:
WOR = Weight of Rods
WOH = Weight of Hammer
DRILLING METHOD: Hollow Stem Auger
LL = Liquid Limit
PID = Photoionization Detector
Pen. = Penetration Length
Rec. = Recovery Length
BORING INFORMATION
AUGER I.D./O.D.: 3.75 inch / NA
Qp = Pocket Penetrometer Strength
I.D./O.D. = Inside Diameter/Outside Diameter
PAGE 1 of 1
B-3
DP = Direct Push Sample
HSA = Hollow-Stem Auger
TOTAL DEPTH (ft): 22.0
RQD = Rock Quality Designation
        = Length of Sound Cores>4 in / Pen.,%
HAMMER TYPE: Safety Hammer - semi-automatic
ABBREVIATIONS:
DRILLING INFORMATION
LOGGED BY: T. Yurman RIG TYPE: Diedrich D-50 ATV
Layer Name
Depth
(ft)
Soil and Rock Description
Sample Information
Sample
   No.
Pen./
Rec.
(in)
Blows
per 6 in.
or RQD
Depth
(ft)
5
10
15
20
Elev.
(ft)
190
180
Drilling Remarks/
Field Test Data
NOTES:  
 PROJECT NAME:   Vessel-Granby
GEI PROJECT NUMBER: 2204905
CITY/STATE: Granby, Connecticut
_GEI WOBURN STD 1-LOCATION-LAYER NAME  2204905 - VESSEL GRANBY.GPJ  GEI DATA TEMPLATE 2013.GDT  2/14/23
VERTICAL DATUM:
DATE START/END: 1/12/2023 - 1/12/2023
DRILLING COMPANY: Seaboard Drilling, Inc.
GROUND SURFACE EL. (ft): 198
LOCATION: See plan. BORING

Page 211

Project GEI Proj. No.
City / Town Location
Client
Contractor
Driller Install Date
Survey
Datum: Length of Riser Pipe above Ground
Ground
Elevation:
Type of Seal
around Surface Casing
Type of Surface Casing
Surface Casing ID
ID and OD of Riser Pipe
Type of Riser Pipe
Type of Backfill around Riser Pipe
Diameter of Borehole
Depth Top of Seal
Type of Seal
Depth Bottom of Seal
Depth Top of Screened Section
Type of Screen
Description of Screen Openings
ID and OD of Screened Section
Type of Filter Material
Depth Bottom of Screened Section
Depth Bottom of Silt Trap
Depth Bottom of Filter Material
Depth Top of Seal
Type of Seal
Depth Bottom of Seal
Type of Backfill below Filter Material
Bottom of Borehole
Notes:
N/A
No survey information available at time of well installation. Elevations should 
be considered approximate.
N/A
N/A
N/A
8.0 ft BGS
Time
Distance to GW below ground surface
8.0 ft BGS
N/A
N/A
N/A
1/12/2023
-
>22.0 ft #2 Sand
No Seal
Date
N/A
3.0 ft BGS
Sch. 40 PVC
0.010 in. slots
2-inch ID
Cuttings 
3.75 in.
N/A
N/A
No Casing
PVC
2-inch ID
2.0 ft
197
N/A
Seaboard Drilling
J. Nitsch GEI Rep. T. Yurman 1/12/2023
Monitoring Well Installation Log MW-1
Vessel Residential Granby 2204905
37 Hartford Ave, Granby Proposed Parking 
Area/ South SideVessel Technologies

Page 212

Project GEI Proj. No.
City / Town Location
Client
Contractor
Driller Install Date
Survey
Datum: Length of Riser Pipe above Ground
Ground
Elevation:
Type of Seal
around Surface Casing
Type of Surface Casing
Surface Casing ID
ID and OD of Riser Pipe
Type of Riser Pipe
Type of Backfill around Riser Pipe
Diameter of Borehole
Depth Top of Seal
Type of Seal
Depth Bottom of Seal
Depth Top of Screened Section
Type of Screen
Description of Screen Openings
ID and OD of Screened Section
Type of Filter Material
Depth Bottom of Screened Section
Depth Bottom of Silt Trap
Depth Bottom of Filter Material
Depth Top of Seal
Type of Seal
Depth Bottom of Seal
Type of Backfill below Filter Material
Bottom of Borehole
Notes: No survey information available at time of well installation. Elevations should 
be considered approximate.
N/A
N/A
N/A
8.0 ft BGS
Date
Time
Distance to GW below ground surface
8.0 ft BGS
N/A
N/A
N/A
1/12/2023
-
>22.0 ft #2 Sand
3.0 ft BGS
Sch. 40 PVC
0.010 in. slots
2-inch ID
3.75 in.
N/A
N/A
N/A
2-inch ID
PVC
Cuttings 
N/A
No Casing
N/A 2.0 ft
200
No Seal
Seaboard Drilling
J. Nitsch GEI Rep. T. Yurman 1/12/2023
Monitoring Well Installation Log MW-2
Vessel Residential Granby 2204905
37 Hartford Ave, Granby Proposed Parking 
Area/ South SideVessel Technologies

Page 213

G E O T E C H N I C A L  R E P O R T  
V E S S E L  R E S I D E N T I A L  
G R A N B Y ,  C O N N E C T I C U T  
F E B R U A R Y  1 6 ,  2 0 2 3  
 
 
GEI Consultants, Inc.    
Appendix B 
Laboratory Test Results 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Page 214

Client: GEI Consultants, Inc.
Project: Vessel Granby
Location: Granby, CT Project No: GTX-316664
Boring ID: ---
Sample ID: ---
Depth : ---
Sample Type: ---
Test Date: 01/26/23
Test Id: 703269
Tested By: ckg
Checked By: ank
Moisture Content of Soil and Rock - ASTM D2216
printed 1/26/2023 3:35:13 PM
 Boring ID  Sample ID  Depth  Description  Moisture
Content,% 
B-1
B-2
B-3
 S2
 S2
 S4
2-4'
2-4'
6-8'
Moist, reddish brown silty sand
Moist, reddish brown silty sand
Moist, brown silty sand
6.8
4.6
5.9
Notes: Temperature of Drying : 110º Celsius

Page 215

Client: GEI Consultants, Inc.
Project: Vessel Granby
Location: Granby, CT Project No: GTX-316664
Boring ID: B-1
Sample ID: S2
Depth : 2-4'
Sample Type: jar
Test Date: 01/26/23
Test Id: 703264
Tested By: ckg
Checked By: ank
Test Comment: ---
Visual Description: Moist, reddish brown sand with gravel
Sample Comment: ---
Particle Size Analysis - ASTM D6913
printed 1/27/2023 11:18:09 AM
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.11101001000
Percent Finer
Grain Size (mm)
1 in 
0.75 in 
0.5 in 
0.375 in 
#4 
#10 
#20 
#40 
#60 
#100 
#140 
#200 
% Co b b le
---
% Gravel
20.2
% Sand
75.2
% Silt & Clay Size
4.6
Sieve Name Sieve Size, mm Percent Finer Spec. Percent Complies
1 in 
0.75 in 
0.5 in 
0.375 in 
#4 
#10 
#20 
#40 
#60 
#100 
#140 
#200 
25.00
19.00
12.50
9.50
4.75
2.00
0.85
0.42
0.25
0.15
0.11
0.075
100
87
82
82
80
77
62
30
12
7
5
4.6
 Coefficients
D   =16.2318 mm85
D   =0.8086 mm60
D   =0.6537 mm50
D   =0.4273 mm30
D   =0.2745 mm15
D   =0.2066 mm10
C   =3.914u C   =1.093c
 Classification
 ASTM Poorly graded SAND with Gravel (SP)
 AASHTO Stone Fragments, Gravel and Sand 
(A-1-b (1))
 Sample/Test Description
Sand/Gravel Particle Shape : ANGULAR
Sand/Gravel Hardness : HARD

Page 216

Client: GEI Consultants, Inc.
Project: Vessel Granby
Location: Granby, CT Project No: GTX-316664
Boring ID: B-2
Sample ID: S2
Depth : 2-4'
Sample Type: jar
Test Date: 01/26/23
Test Id: 703265
Tested By: ckg
Checked By: ank
Test Comment: ---
Visual Description: Moist, reddish brown sand
Sample Comment: ---
Particle Size Analysis - ASTM D6913
printed 1/27/2023 11:18:10 AM
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.11101001000
Percent Finer
Grain Size (mm)
0.75 in 
0.5 in 
0.375 in 
#4 
#10 
#20 
#40 
#60 
#100 
#140 
#200 
% Co b b le
---
% Gravel
14.5
% Sand
81.7
% Silt & Clay Size
3.8
Sieve Name Sieve Size, mm Percent Finer Spec. Percent Complies
0.75 in 
0.5 in 
0.375 in 
#4 
#10 
#20 
#40 
#60 
#100 
#140 
#200 
19.00
12.50
9.50
4.75
2.00
0.85
0.42
0.25
0.15
0.11
0.075
100
92
91
85
79
61
26
10
6
4
3.8
 Coefficients
D   =4.4546 mm85
D   =0.8259 mm60
D   =0.6777 mm50
D   =0.4563 mm30
D   =0.2952 mm15
D   =0.2516 mm10
C   =3.283u C   =1.002c
 Classification
 ASTM Poorly graded SAND (SP)
 AASHTO Stone Fragments, Gravel and Sand 
(A-1-b (1))
 Sample/Test Description
Sand/Gravel Particle Shape : ANGULAR
Sand/Gravel Hardness : HARD

Page 217

Client: GEI Consultants, Inc.
Project: Vessel Granby
Location: Granby, CT Project No: GTX-316664
Boring ID: B-3
Sample ID: S4
Depth : 6-8'
Sample Type: jar
Test Date: 01/26/23
Test Id: 703266
Tested By: ckg
Checked By: ank
Test Comment: ---
Visual Description: Moist, brown sand
Sample Comment: ---
Particle Size Analysis - ASTM D6913
printed 1/27/2023 11:18:11 AM
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.11101001000
Percent Finer
Grain Size (mm)
#4 
#10 
#20 
#40 
#60 
#100 
#140 
#200 
% Co b b le
---
% Gravel
0.0
% Sand
97.6
% Silt & Clay Size
2.4
Sieve Name Sieve Size, mm Percent Finer Spec. Percent Complies
#4 
#10 
#20 
#40 
#60 
#100 
#140 
#200 
4.75
2.00
0.85
0.42
0.25
0.15
0.11
0.075
100
100
100
95
48
11
5
2.4
 Coefficients
D   =0.3814 mm85
D   =0.2871 mm60
D   =0.2563 mm50
D   =0.1958 mm30
D   =0.1594 mm15
D   =0.1450 mm10
C   =1.980u C   =0.921c
 Classification
 ASTM Poorly graded SAND (SP)
 AASHTO Fine Sand (A-3 (1))
 Sample/Test Description
Sand/Gravel Particle Shape : ---
Sand/Gravel Hardness : ---

Page 218

G E O T E C H N I C A L  R E P O R T  
V E S S E L  R E S I D E N T I A L  
G R A N B Y ,  C O N N E C T I C U T  
F E B R U A R Y  1 6 ,  2 0 2 3  
 
 
GEI Consultants, Inc.    
Appendix C 
Recommended Material Specifications 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Page 219

Recommended Material Specifications 
Vessel – 37 Hartford Avenue 
Granby, CT 
 
 
Per the Geotechnical Report, native sands excavated as part of earthwork activities can likely be re-used 
on site as Structural Fill or Ordinary Fill, provided they do not contain oversize, organic, or otherwise 
deleterious material and can meet the appropriate compaction requirements.   
 
Fill imported from off site should meet the attached gradation requirements.  Fill placed within the 
building limits, within a 3-foot-wide zone outside foundation walls, under pavements, and behind 
retaining walls should meet the compaction requirements for Structural Fill.  Backfill placed in non-
structural areas should meet the compaction requirements for Ordinary Fill.  Proposed borrow materials 
that fall slightly outside of these specifications may also be suitable for use, subject to review and 
approval by GEI.     
 
Structural Fill 
 
Imported Structural Fill should consist of hard, durable sand and gravel. It should be free of clay, organic 
matter, surface coatings, and other deleterious materials.  Soil finer than the No. 200 sieve (the “fines”) 
should be non-plastic.  Structural Fill shall meet the following gradation requirements: 
 
Sieve Size Percent Passing by Weight 
3 inches 100 
1 - ½ inch 55 – 100 
No. 4 35 – 85 
No. 16 20 – 65 
No. 50 5 – 40 
No. 200 (fines) 0 – 10 
 
 
Structural Fill should be compacted in maximum 12-inch-thick, loose lifts to at least 95 percent of the 
maximum dry density determined in accordance with ASTM D1557 (Modified AASHTO Compaction).  
The moisture content should be held to within +/- 3 percent of optimum moisture content (as determined 
by ASTM D1557). 
 
 
Ordinary Fill  
 
Ordinary fill should consist of hard, durable sand and gravel, free of clay, organic matter, surface 
coatings, and other deleterious materials. Soil finer than the No. 200 sieve (the “fines”) should be 
nonplastic. Ordinary Fill shall meet the following gradation requirements : 
 

Page 220

 
Sieve Size Percent Passing by Weight 
6 inches 100 
3 inches 80 – 100 
No. 4 20 – 100 
No. 200 (fines) 0 – 20 
 
 
Ordinary fill should be compacted in maximum 12-inch-thick, loose lifts to at least 92 percent of the 
maximum dry density determined in accordance with ASTM D1557 (Modified AASHTO Compaction).  
The moisture content should be held to within +/- 3 percent of optimum moisture content (as determined 
by ASTM D1557).  
 
Crushed Stone 
 
Crushed Stone should consist of a ¾-inch size durable crushed rock or durable crushed gravel stone and 
shall conform to the requirements of the ConnDOT Form 818, Section M.01.01, No. 6. Crushed stone 
should be compacted with at least four passes of a vibratory compactor.  
 
Geotextile Fabric 
 
Geotextile fabric should be a non-woven fabric, consisting of Mirafi 140N or an approved equal product.  

Page 221

G E O T E C H N I C A L  R E P O R T  
V E S S E L  R E S I D E N T I A L  
G R A N B Y ,  C O N N E C T I C U T  
F E B R U A R Y  1 6 ,  2 0 2 3  
 
 
GEI Consultants, Inc.    
Appendix D 
Infiltration/Permeability Testing Results 

Page 222

WELL CALCULATIONS (W-1)
("Soil in casing in uniform soil," Lambe and Whitman, 1969.)
Diameter, sand pack 9.53 D (cm)
Diam., PVC riser 5.08 d (cm)
Length, slotted PVC 152 L (cm)
k'v/kv 1 Assumed
162 0
168 15
174 30
177 45
183 60
189 75
198 90
207 105
Vertical Perm. 
k'v (in/hr)
153.87
196.29
187.43
9.61E-02
1.09E-01
Soil Permeability Calculations
Height
H (cm)
Time
t (seconds)
Vertical Perm. 
k'v (cm/sec)
146 Hartford Ave.
Granby, CT
1.05E-01
5.10E-02
9.94E-02
1.38E-01
1.32E-01
AVERAGE
148.37
72.25
140.83
136.21
138.5
′  =
(  11 



 + )
( − ) ln  

Page 223

WELL CALCULATIONS (W-2)
("Soil in casing in uniform soil," Lambe and Whitman, 1969.)
Diameter, sand pack 9.53 D (cm)
Diam., PVC riser 5.08 d (cm)
Length, slotted PVC 152 L (cm)
k'v/kv 1 Assumed
Height 
H (cm)
Time 
t (seconds)
131 0
146 15
152 30
165 45
180 60
189 75
198 90
201 105
1.38E-01 196.3
4.47E-02 63.4
AVERAGE 111.6
2.26E-01 319.7
2.60E-01 367.9
1.45E-01 206.0
3.22E-01 456.9
1.20E-01 169.6
Vertical Perm. 
k'v (cm/sec)
Vertical Perm. 
k'v (in/hr)
146 Hartford Ave.
Granby, CT
Soil Permeability Calculations
′  =
(  11 



 + )
( − ) ln  

Page 224

Page 225

Page 226

Page 227

Page 228

 

Page 229

Page 230

ES-1
ES-2
DP-1
Hartford Avenue
DP-2
Off-Site Wetlands
Routing Diagram for 251219 - PRE
Prepared by R Levesque Associates,  Printed 5/28/2026
HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Subcat Reach Pond Link

Page 231

251219 - PRE
  Printed  5/28/2026Prepared by R Levesque Associates
Page 2HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Rainfall Events Listing
Event# Event
Name
Storm Type Curve Mode Duration
(hours)
B/B Depth
(inches)
AMC
1 2-Year Type III 24-hr Default 24.00 1 3.26 2
2 10-Year Type III 24-hr Default 24.00 1 4.86 2
3 25-Year Type III 24-hr Default 24.00 1 6.11 2
4 100-Year Type III 24-hr Default 24.00 1 8.63 2

Page 232

Type III 24-hr  2-Year Rainfall=3.26"251219 - PRE
  Printed  5/28/2026Prepared by R Levesque Associates
Page 3HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Stor-Ind+Trans method  -  Pond routing by Stor-Ind method
Runoff Area=14,006 sf   11.51% Impervious   Runoff Depth=0.76"Subcatchment ES-1: 
   Flow Length=100'   Tc=10.0 min   CN=WQ   Runoff=0.2 cfs  891 cf
Runoff Area=97,185 sf   7.57% Impervious   Runoff Depth=0.33"Subcatchment ES-2: 
   Flow Length=172'   Tc=10.0 min   CN=WQ   Runoff=0.6 cfs  2,705 cf
   Inflow=0.2 cfs  891 cfLink DP-1: Hartford Avenue
   Primary=0.2 cfs  891 cf
   Inflow=0.6 cfs  2,705 cfLink DP-2: Off-Site Wetlands
   Primary=0.6 cfs  2,705 cf
Total Runoff Area = 111,192 sf   Runoff Volume = 3,595 cf   Average Runoff Depth = 0.39"
91.94% Pervious = 102,227 sf     8.06% Impervious = 8,965 sf

Page 233

Type III 24-hr  2-Year Rainfall=3.26"251219 - PRE
  Printed  5/28/2026Prepared by R Levesque Associates
Page 4HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment ES-1: 
Runoff = 0.2 cfs @ 12.16 hrs,  Volume= 891 cf,  Depth= 0.76"
     Routed to Link DP-1 : Hartford Avenue
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  2-Year Rainfall=3.26"
Area (sf) CN Description
12,395 61 >75% Grass cover, Good, HSG B
1,612 98 Paved parking, HSG B
14,006 Weighted Average
12,395 61 88.49% Pervious Area
1,612 98 11.51% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
5.9 75 0.0420 0.21 Sheet Flow, 
Grass: Short   n= 0.150   P2= 3.11"
0.5 25 0.0100 0.78 Sheet Flow, 
Smooth surfaces   n= 0.011   P2= 3.11"
6.4 100 Total,  Increased to minimum Tc = 10.0 min
Subcatchment ES-1: 
Runoff
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
0.2
0.19
0.18
0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
Type III 24-hr
2-Year Rainfall=3.26"
Runoff Area=14,006 sf
Runoff Volume=891 cf
Runoff Depth=0.76"
Flow Length=100'
Tc=10.0 min
CN=WQ
  0.2 cfs  

Page 234

Type III 24-hr  2-Year Rainfall=3.26"251219 - PRE
  Printed  5/28/2026Prepared by R Levesque Associates
Page 5HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment ES-2: 
Runoff = 0.6 cfs @ 12.15 hrs,  Volume= 2,705 cf,  Depth= 0.33"
     Routed to Link DP-2 : Off-Site Wetlands
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  2-Year Rainfall=3.26"
Area (sf) CN Description
38,711 39 >75% Grass cover, Good, HSG A
17,267 61 >75% Grass cover, Good, HSG B
7,353 98 Paved parking, HSG B
26,193 30 Woods, Good, HSG A
7,661 55 Woods, Good, HSG B
97,185 Weighted Average
89,832 42 92.43% Pervious Area
7,353 98 7.57% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.9 96 0.1870 0.41 Sheet Flow, 
Grass: Short   n= 0.150   P2= 3.11"
0.3 76 0.4800 4.85 Shallow Concentrated Flow, 
Short Grass Pasture   Kv= 7.0 fps
4.2 172 Total,  Increased to minimum Tc = 10.0 min
Subcatchment ES-2: 
Runoff
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Type III 24-hr
2-Year Rainfall=3.26"
Runoff Area=97,185 sf
Runoff Volume=2,705 cf
Runoff Depth=0.33"
Flow Length=172'
Tc=10.0 min
CN=WQ
  0.6 cfs  

Page 235

Type III 24-hr  2-Year Rainfall=3.26"251219 - PRE
  Printed  5/28/2026Prepared by R Levesque Associates
Page 6HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Link DP-1: Hartford Avenue
Inflow Area = 14,006 sf, 11.51% Impervious,  Inflow Depth = 0.76"    for  2-Year event
Inflow = 0.2 cfs @ 12.16 hrs,  Volume= 891 cf
Primary = 0.2 cfs @ 12.16 hrs,  Volume= 891 cf,  Atten= 0%,  Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Link DP-1: Hartford Avenue
Inflow
Primary
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
0.2
0.19
0.18
0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
Inflow Area=14,006 sf
  0.2 cfs  
  0.2 cfs  

Page 236

Type III 24-hr  2-Year Rainfall=3.26"251219 - PRE
  Printed  5/28/2026Prepared by R Levesque Associates
Page 7HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Link DP-2: Off-Site Wetlands
Inflow Area = 97,185 sf, 7.57% Impervious,  Inflow Depth = 0.33"    for  2-Year event
Inflow = 0.6 cfs @ 12.15 hrs,  Volume= 2,705 cf
Primary = 0.6 cfs @ 12.15 hrs,  Volume= 2,705 cf,  Atten= 0%,  Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Link DP-2: Off-Site Wetlands
Inflow
Primary
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Inflow Area=97,185 sf
  0.6 cfs  
  0.6 cfs  

Page 237

Type III 24-hr  10-Year Rainfall=4.86"251219 - PRE
  Printed  5/28/2026Prepared by R Levesque Associates
Page 8HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Stor-Ind+Trans method  -  Pond routing by Stor-Ind method
Runoff Area=14,006 sf   11.51% Impervious   Runoff Depth=1.67"Subcatchment ES-1: 
   Flow Length=100'   Tc=10.0 min   CN=WQ   Runoff=0.5 cfs  1,949 cf
Runoff Area=97,185 sf   7.57% Impervious   Runoff Depth=0.72"Subcatchment ES-2: 
   Flow Length=172'   Tc=10.0 min   CN=WQ   Runoff=1.3 cfs  5,825 cf
   Inflow=0.5 cfs  1,949 cfLink DP-1: Hartford Avenue
   Primary=0.5 cfs  1,949 cf
   Inflow=1.3 cfs  5,825 cfLink DP-2: Off-Site Wetlands
   Primary=1.3 cfs  5,825 cf
Total Runoff Area = 111,192 sf   Runoff Volume = 7,774 cf   Average Runoff Depth = 0.84"
91.94% Pervious = 102,227 sf     8.06% Impervious = 8,965 sf

Page 238

Type III 24-hr  10-Year Rainfall=4.86"251219 - PRE
  Printed  5/28/2026Prepared by R Levesque Associates
Page 9HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment ES-1: 
Runoff = 0.5 cfs @ 12.15 hrs,  Volume= 1,949 cf,  Depth= 1.67"
     Routed to Link DP-1 : Hartford Avenue
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  10-Year Rainfall=4.86"
Area (sf) CN Description
12,395 61 >75% Grass cover, Good, HSG B
1,612 98 Paved parking, HSG B
14,006 Weighted Average
12,395 61 88.49% Pervious Area
1,612 98 11.51% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
5.9 75 0.0420 0.21 Sheet Flow, 
Grass: Short   n= 0.150   P2= 3.11"
0.5 25 0.0100 0.78 Sheet Flow, 
Smooth surfaces   n= 0.011   P2= 3.11"
6.4 100 Total,  Increased to minimum Tc = 10.0 min
Subcatchment ES-1: 
Runoff
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Type III 24-hr
10-Year Rainfall=4.86"
Runoff Area=14,006 sf
Runoff Volume=1,949 cf
Runoff Depth=1.67"
Flow Length=100'
Tc=10.0 min
CN=WQ
  0.5 cfs  

Page 239

Type III 24-hr  10-Year Rainfall=4.86"251219 - PRE
  Printed  5/28/2026Prepared by R Levesque Associates
Page 10HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment ES-2: 
Runoff = 1.3 cfs @ 12.15 hrs,  Volume= 5,825 cf,  Depth= 0.72"
     Routed to Link DP-2 : Off-Site Wetlands
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  10-Year Rainfall=4.86"
Area (sf) CN Description
38,711 39 >75% Grass cover, Good, HSG A
17,267 61 >75% Grass cover, Good, HSG B
7,353 98 Paved parking, HSG B
26,193 30 Woods, Good, HSG A
7,661 55 Woods, Good, HSG B
97,185 Weighted Average
89,832 42 92.43% Pervious Area
7,353 98 7.57% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.9 96 0.1870 0.41 Sheet Flow, 
Grass: Short   n= 0.150   P2= 3.11"
0.3 76 0.4800 4.85 Shallow Concentrated Flow, 
Short Grass Pasture   Kv= 7.0 fps
4.2 172 Total,  Increased to minimum Tc = 10.0 min
Subcatchment ES-2: 
Runoff
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
1
0
Type III 24-hr
10-Year Rainfall=4.86"
Runoff Area=97,185 sf
Runoff Volume=5,825 cf
Runoff Depth=0.72"
Flow Length=172'
Tc=10.0 min
CN=WQ
  1.3 cfs  

Page 240

Type III 24-hr  10-Year Rainfall=4.86"251219 - PRE
  Printed  5/28/2026Prepared by R Levesque Associates
Page 11HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Link DP-1: Hartford Avenue
Inflow Area = 14,006 sf, 11.51% Impervious,  Inflow Depth = 1.67"    for  10-Year event
Inflow = 0.5 cfs @ 12.15 hrs,  Volume= 1,949 cf
Primary = 0.5 cfs @ 12.15 hrs,  Volume= 1,949 cf,  Atten= 0%,  Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Link DP-1: Hartford Avenue
Inflow
Primary
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Inflow Area=14,006 sf
  0.5 cfs  
  0.5 cfs  

Page 241

Type III 24-hr  10-Year Rainfall=4.86"251219 - PRE
  Printed  5/28/2026Prepared by R Levesque Associates
Page 12HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Link DP-2: Off-Site Wetlands
Inflow Area = 97,185 sf, 7.57% Impervious,  Inflow Depth = 0.72"    for  10-Year event
Inflow = 1.3 cfs @ 12.15 hrs,  Volume= 5,825 cf
Primary = 1.3 cfs @ 12.15 hrs,  Volume= 5,825 cf,  Atten= 0%,  Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Link DP-2: Off-Site Wetlands
Inflow
Primary
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
1
0
Inflow Area=97,185 sf
  1.3 cfs  
  1.3 cfs  

Page 242

Type III 24-hr  25-Year Rainfall=6.11"251219 - PRE
  Printed  5/28/2026Prepared by R Levesque Associates
Page 13HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Stor-Ind+Trans method  -  Pond routing by Stor-Ind method
Runoff Area=14,006 sf   11.51% Impervious   Runoff Depth=2.52"Subcatchment ES-1: 
   Flow Length=100'   Tc=10.0 min   CN=WQ   Runoff=0.8 cfs  2,937 cf
Runoff Area=97,185 sf   7.57% Impervious   Runoff Depth=1.15"Subcatchment ES-2: 
   Flow Length=172'   Tc=10.0 min   CN=WQ   Runoff=2.0 cfs  9,323 cf
   Inflow=0.8 cfs  2,937 cfLink DP-1: Hartford Avenue
   Primary=0.8 cfs  2,937 cf
   Inflow=2.0 cfs  9,323 cfLink DP-2: Off-Site Wetlands
   Primary=2.0 cfs  9,323 cf
Total Runoff Area = 111,192 sf   Runoff Volume = 12,260 cf   Average Runoff Depth = 1.32"
91.94% Pervious = 102,227 sf     8.06% Impervious = 8,965 sf

Page 243

Type III 24-hr  25-Year Rainfall=6.11"251219 - PRE
  Printed  5/28/2026Prepared by R Levesque Associates
Page 14HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment ES-1: 
Runoff = 0.8 cfs @ 12.15 hrs,  Volume= 2,937 cf,  Depth= 2.52"
     Routed to Link DP-1 : Hartford Avenue
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  25-Year Rainfall=6.11"
Area (sf) CN Description
12,395 61 >75% Grass cover, Good, HSG B
1,612 98 Paved parking, HSG B
14,006 Weighted Average
12,395 61 88.49% Pervious Area
1,612 98 11.51% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
5.9 75 0.0420 0.21 Sheet Flow, 
Grass: Short   n= 0.150   P2= 3.11"
0.5 25 0.0100 0.78 Sheet Flow, 
Smooth surfaces   n= 0.011   P2= 3.11"
6.4 100 Total,  Increased to minimum Tc = 10.0 min
Subcatchment ES-1: 
Runoff
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
0.85
0.8
0.75
0.7
0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Type III 24-hr
25-Year Rainfall=6.11"
Runoff Area=14,006 sf
Runoff Volume=2,937 cf
Runoff Depth=2.52"
Flow Length=100'
Tc=10.0 min
CN=WQ
  0.8 cfs  

Page 244

Type III 24-hr  25-Year Rainfall=6.11"251219 - PRE
  Printed  5/28/2026Prepared by R Levesque Associates
Page 15HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment ES-2: 
Runoff = 2.0 cfs @ 12.15 hrs,  Volume= 9,323 cf,  Depth= 1.15"
     Routed to Link DP-2 : Off-Site Wetlands
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  25-Year Rainfall=6.11"
Area (sf) CN Description
38,711 39 >75% Grass cover, Good, HSG A
17,267 61 >75% Grass cover, Good, HSG B
7,353 98 Paved parking, HSG B
26,193 30 Woods, Good, HSG A
7,661 55 Woods, Good, HSG B
97,185 Weighted Average
89,832 42 92.43% Pervious Area
7,353 98 7.57% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.9 96 0.1870 0.41 Sheet Flow, 
Grass: Short   n= 0.150   P2= 3.11"
0.3 76 0.4800 4.85 Shallow Concentrated Flow, 
Short Grass Pasture   Kv= 7.0 fps
4.2 172 Total,  Increased to minimum Tc = 10.0 min
Subcatchment ES-2: 
Runoff
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
2
1
0
Type III 24-hr
25-Year Rainfall=6.11"
Runoff Area=97,185 sf
Runoff Volume=9,323 cf
Runoff Depth=1.15"
Flow Length=172'
Tc=10.0 min
CN=WQ
  2.0 cfs  

Page 245

Type III 24-hr  25-Year Rainfall=6.11"251219 - PRE
  Printed  5/28/2026Prepared by R Levesque Associates
Page 16HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Link DP-1: Hartford Avenue
Inflow Area = 14,006 sf, 11.51% Impervious,  Inflow Depth = 2.52"    for  25-Year event
Inflow = 0.8 cfs @ 12.15 hrs,  Volume= 2,937 cf
Primary = 0.8 cfs @ 12.15 hrs,  Volume= 2,937 cf,  Atten= 0%,  Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Link DP-1: Hartford Avenue
Inflow
Primary
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
0.85
0.8
0.75
0.7
0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Inflow Area=14,006 sf
  0.8 cfs  
  0.8 cfs  

Page 246

Type III 24-hr  25-Year Rainfall=6.11"251219 - PRE
  Printed  5/28/2026Prepared by R Levesque Associates
Page 17HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Link DP-2: Off-Site Wetlands
Inflow Area = 97,185 sf, 7.57% Impervious,  Inflow Depth = 1.15"    for  25-Year event
Inflow = 2.0 cfs @ 12.15 hrs,  Volume= 9,323 cf
Primary = 2.0 cfs @ 12.15 hrs,  Volume= 9,323 cf,  Atten= 0%,  Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Link DP-2: Off-Site Wetlands
Inflow
Primary
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
2
1
0
Inflow Area=97,185 sf
  2.0 cfs  
  2.0 cfs  

Page 247

Type III 24-hr  100-Year Rainfall=8.63"251219 - PRE
  Printed  5/28/2026Prepared by R Levesque Associates
Page 18HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Stor-Ind+Trans method  -  Pond routing by Stor-Ind method
Runoff Area=14,006 sf   11.51% Impervious   Runoff Depth=4.44"Subcatchment ES-1: 
   Flow Length=100'   Tc=10.0 min   CN=WQ   Runoff=1.4 cfs  5,188 cf
Runoff Area=97,185 sf   7.57% Impervious   Runoff Depth=2.31"Subcatchment ES-2: 
   Flow Length=172'   Tc=10.0 min   CN=WQ   Runoff=4.3 cfs  18,731 cf
   Inflow=1.4 cfs  5,188 cfLink DP-1: Hartford Avenue
   Primary=1.4 cfs  5,188 cf
   Inflow=4.3 cfs  18,731 cfLink DP-2: Off-Site Wetlands
   Primary=4.3 cfs  18,731 cf
Total Runoff Area = 111,192 sf   Runoff Volume = 23,919 cf   Average Runoff Depth = 2.58"
91.94% Pervious = 102,227 sf     8.06% Impervious = 8,965 sf

Page 248

Type III 24-hr  100-Year Rainfall=8.63"251219 - PRE
  Printed  5/28/2026Prepared by R Levesque Associates
Page 19HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment ES-1: 
Runoff = 1.4 cfs @ 12.14 hrs,  Volume= 5,188 cf,  Depth= 4.44"
     Routed to Link DP-1 : Hartford Avenue
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  100-Year Rainfall=8.63"
Area (sf) CN Description
12,395 61 >75% Grass cover, Good, HSG B
1,612 98 Paved parking, HSG B
14,006 Weighted Average
12,395 61 88.49% Pervious Area
1,612 98 11.51% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
5.9 75 0.0420 0.21 Sheet Flow, 
Grass: Short   n= 0.150   P2= 3.11"
0.5 25 0.0100 0.78 Sheet Flow, 
Smooth surfaces   n= 0.011   P2= 3.11"
6.4 100 Total,  Increased to minimum Tc = 10.0 min
Subcatchment ES-1: 
Runoff
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
1
0
Type III 24-hr
100-Year Rainfall=8.63"
Runoff Area=14,006 sf
Runoff Volume=5,188 cf
Runoff Depth=4.44"
Flow Length=100'
Tc=10.0 min
CN=WQ
  1.4 cfs  

Page 249

Type III 24-hr  100-Year Rainfall=8.63"251219 - PRE
  Printed  5/28/2026Prepared by R Levesque Associates
Page 20HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment ES-2: 
Runoff = 4.3 cfs @ 12.15 hrs,  Volume= 18,731 cf,  Depth= 2.31"
     Routed to Link DP-2 : Off-Site Wetlands
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  100-Year Rainfall=8.63"
Area (sf) CN Description
38,711 39 >75% Grass cover, Good, HSG A
17,267 61 >75% Grass cover, Good, HSG B
7,353 98 Paved parking, HSG B
26,193 30 Woods, Good, HSG A
7,661 55 Woods, Good, HSG B
97,185 Weighted Average
89,832 42 92.43% Pervious Area
7,353 98 7.57% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.9 96 0.1870 0.41 Sheet Flow, 
Grass: Short   n= 0.150   P2= 3.11"
0.3 76 0.4800 4.85 Shallow Concentrated Flow, 
Short Grass Pasture   Kv= 7.0 fps
4.2 172 Total,  Increased to minimum Tc = 10.0 min
Subcatchment ES-2: 
Runoff
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
4
3
2
1
0
Type III 24-hr
100-Year Rainfall=8.63"
Runoff Area=97,185 sf
Runoff Volume=18,731 cf
Runoff Depth=2.31"
Flow Length=172'
Tc=10.0 min
CN=WQ
  4.3 cfs  

Page 250

Type III 24-hr  100-Year Rainfall=8.63"251219 - PRE
  Printed  5/28/2026Prepared by R Levesque Associates
Page 21HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Link DP-1: Hartford Avenue
Inflow Area = 14,006 sf, 11.51% Impervious,  Inflow Depth = 4.44"    for  100-Year event
Inflow = 1.4 cfs @ 12.14 hrs,  Volume= 5,188 cf
Primary = 1.4 cfs @ 12.14 hrs,  Volume= 5,188 cf,  Atten= 0%,  Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Link DP-1: Hartford Avenue
Inflow
Primary
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
1
0
Inflow Area=14,006 sf
  1.4 cfs  
  1.4 cfs  

Page 251

Type III 24-hr  100-Year Rainfall=8.63"251219 - PRE
  Printed  5/28/2026Prepared by R Levesque Associates
Page 22HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Link DP-2: Off-Site Wetlands
Inflow Area = 97,185 sf, 7.57% Impervious,  Inflow Depth = 2.31"    for  100-Year event
Inflow = 4.3 cfs @ 12.15 hrs,  Volume= 18,731 cf
Primary = 4.3 cfs @ 12.15 hrs,  Volume= 18,731 cf,  Atten= 0%,  Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Link DP-2: Off-Site Wetlands
Inflow
Primary
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
4
3
2
1
0
Inflow Area=97,185 sf
  4.3 cfs  
  4.3 cfs  

Page 252

Page 253

PS-1
PS-2a
PS-2b
1P
Subsurface Infiltration
 Basin
DP-1
Hartford Avenue
DP-2
Off-Site Wetlands
Routing Diagram for 251219 - POST
Prepared by R Levesque Associates,  Printed 6/1/2026
HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Subcat Reach Pond Link

Page 254

251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 2HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Rainfall Events Listing
Event# Event
Name
Storm Type Curve Mode Duration
(hours)
B/B Depth
(inches)
AMC
1 2-Year Type III 24-hr Default 24.00 1 3.26 2
2 10-Year Type III 24-hr Default 24.00 1 4.86 2
3 25-Year Type III 24-hr Default 24.00 1 6.11 2
4 100-Year Type III 24-hr Default 24.00 1 8.63 2

Page 255

Type III 24-hr  2-Year Rainfall=3.26"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 3HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Stor-Ind+Trans method  -  Pond routing by Stor-Ind method
Runoff Area=12,127 sf   20.66% Impervious   Runoff Depth=1.00"Subcatchment PS-1: 
   Flow Length=100'   Tc=10.0 min   CN=WQ   Runoff=0.2 cfs  1,008 cf
Runoff Area=30,117 sf   75.92% Impervious   Runoff Depth=2.40"Subcatchment PS-2a: 
   Tc=10.0 min   CN=WQ   Runoff=1.5 cfs  6,036 cf
Runoff Area=68,949 sf   0.57% Impervious   Runoff Depth=0.09"Subcatchment PS-2b: 
   Flow Length=172'   Tc=10.0 min   CN=WQ   Runoff=0.1 cfs  502 cf
Peak Elev=195.50'  Storage=1,234 cf   Inflow=1.5 cfs  6,036 cfPond 1P: Subsurface Infiltration Basin
   Discarded=0.4 cfs  6,036 cf   Primary=0.0 cfs  0 cf   Outflow=0.4 cfs  6,036 cf
   Inflow=0.2 cfs  1,008 cfLink DP-1: Hartford Avenue
   Primary=0.2 cfs  1,008 cf
   Inflow=0.1 cfs  502 cfLink DP-2: Off-Site Wetlands
   Primary=0.1 cfs  502 cf
Total Runoff Area = 111,193 sf   Runoff Volume = 7,546 cf   Average Runoff Depth = 0.81"
76.83% Pervious = 85,427 sf     23.17% Impervious = 25,767 sf

Page 256

Type III 24-hr  2-Year Rainfall=3.26"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 4HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment PS-1: 
Runoff = 0.2 cfs @ 12.15 hrs,  Volume= 1,008 cf,  Depth= 1.00"
     Routed to Link DP-1 : Hartford Avenue
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  2-Year Rainfall=3.26"
Area (sf) CN Description
9,622 61 >75% Grass cover, Good, HSG B
2,505 98 Paved parking, HSG B
12,127 Weighted Average
9,622 61 79.34% Pervious Area
2,505 98 20.66% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
5.9 75 0.0420 0.21 Sheet Flow, 
Grass: Short   n= 0.150   P2= 3.11"
0.5 25 0.0100 0.78 Sheet Flow, 
Smooth surfaces   n= 0.011   P2= 3.11"
6.4 100 Total,  Increased to minimum Tc = 10.0 min
Subcatchment PS-1: 
Runoff
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
0.24
0.23
0.22
0.21
0.2
0.19
0.18
0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
Type III 24-hr
2-Year Rainfall=3.26"
Runoff Area=12,127 sf
Runoff Volume=1,008 cf
Runoff Depth=1.00"
Flow Length=100'
Tc=10.0 min
CN=WQ
  0.2 cfs  

Page 257

Type III 24-hr  2-Year Rainfall=3.26"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 5HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment PS-2a: 
Runoff = 1.5 cfs @ 12.14 hrs,  Volume= 6,036 cf,  Depth= 2.40"
     Routed to Pond 1P : Subsurface Infiltration Basin
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  2-Year Rainfall=3.26"
Area (sf) CN Description
19 39 >75% Grass cover, Good, HSG A
6,322 61 >75% Grass cover, Good, HSG B
9,107 98 Paved parking, HSG A
8,312 98 Paved parking, HSG B
5,447 98 Roofs, HSG B
911 55 Woods, Good, HSG B
30,117 Weighted Average
7,252 60 24.08% Pervious Area
22,865 98 75.92% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
10.0 Direct Entry, 
Subcatchment PS-2a: 
Runoff
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
1
0
Type III 24-hr
2-Year Rainfall=3.26"
Runoff Area=30,117 sf
Runoff Volume=6,036 cf
Runoff Depth=2.40"
Tc=10.0 min
CN=WQ
  1.5 cfs  

Page 258

Type III 24-hr  2-Year Rainfall=3.26"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 6HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment PS-2b: 
Runoff = 0.1 cfs @ 12.19 hrs,  Volume= 502 cf,  Depth= 0.09"
     Routed to Link DP-2 : Off-Site Wetlands
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  2-Year Rainfall=3.26"
Area (sf) CN Description
29,350 39 >75% Grass cover, Good, HSG A
6,505 61 >75% Grass cover, Good, HSG B
235 98 Paved parking, HSG A
161 98 Paved parking, HSG B
26,193 30 Woods, Good, HSG A
6,504 55 Woods, Good, HSG B
68,949 Weighted Average
68,553 39 99.43% Pervious Area
396 98 0.57% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.9 96 0.1870 0.41 Sheet Flow, 
Grass: Short   n= 0.150   P2= 3.11"
0.3 76 0.4300 4.59 Shallow Concentrated Flow, 
Short Grass Pasture   Kv= 7.0 fps
4.2 172 Total,  Increased to minimum Tc = 10.0 min
Subcatchment PS-2b: 
Runoff
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
Type III 24-hr
2-Year Rainfall=3.26"
Runoff Area=68,949 sf
Runoff Volume=502 cf
Runoff Depth=0.09"
Flow Length=172'
Tc=10.0 min
CN=WQ
  0.1 cfs  

Page 259

Type III 24-hr  2-Year Rainfall=3.26"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 7HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Pond 1P: Subsurface Infiltration Basin
Inflow Area = 30,117 sf, 75.92% Impervious,  Inflow Depth = 2.40"    for  2-Year event
Inflow = 1.5 cfs @ 12.14 hrs,  Volume= 6,036 cf
Outflow = 0.4 cfs @ 11.82 hrs,  Volume= 6,036 cf,  Atten= 74%,  Lag= 0.0 min
Discarded = 0.4 cfs @ 11.82 hrs,  Volume= 6,036 cf
Primary = 0.0 cfs @ 0.00 hrs,  Volume= 0 cf
     Routed to Link DP-2 : Off-Site Wetlands
Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Peak Elev= 195.50' @ 12.55 hrs   Surf.Area= 2,011 sf   Storage= 1,234 cf
Plug-Flow detention time= 15.7 min calculated for 6,032 cf (100% of inflow)
Center-of-Mass det. time= 15.7 min ( 782.5 - 766.8 )
Volume Invert Avail.Storage Storage Description
#1A 194.50' 1,915 cf 15.25'W x 131.87'L x 3.75'H Field A
7,541 cf Overall - 2,753 cf Embedded = 4,789 cf  x 40.0% Voids
#2A 195.00' 2,753 cf ADS_StormTech SC-800 +Cap  x 54  Inside #1
Effective Size= 45.0"W x 33.0"H => 7.11 sf x 7.12'L = 50.6 cf
Overall Size= 51.0"W x 33.0"H x 7.55'L with 0.43' Overlap
54 Chambers in 3 Rows
Cap Storage= 3.4 cf x 2 x 3 rows = 20.5 cf
4,668 cf Total Available Storage
     Storage Group A created with Chamber Wizard
Device Routing     Invert Outlet Devices
#1 Primary 195.00' 12.0"  Round Culvert   
L= 45.0'   RCP, groove end projecting,  Ke= 0.200   
Inlet / Outlet Invert= 195.00' / 194.10'   S= 0.0200 '/'   Cc= 0.900   
n= 0.013,  Flow Area= 0.79 sf   
#2 Device 1 197.25' 4.0' long Sharp-Crested Rectangular Weir   2 End Contraction(s)   
#3 Device 1 196.75' 12.0" W x 3.0" H Vert. Orifice    C= 0.600   
Limited to weir flow at low heads   
#4 Discarded 194.50' 8.270 in/hr Exfiltration over Surface area     Phase-In= 0.01'   
Discarded OutFlow  Max=0.4 cfs @ 11.82 hrs  HW=194.54'   (Free Discharge)
4=Exfiltration  (Exfiltration Controls 0.4 cfs)
Primary OutFlow  Max=0.0 cfs @ 0.00 hrs  HW=194.50'   (Free Discharge)
1=Culvert  ( Controls 0.0 cfs)
2=Sharp-Crested Rectangular Weir  ( Controls 0.0 cfs)
3=Orifice  ( Controls 0.0 cfs)

Page 260

Type III 24-hr  2-Year Rainfall=3.26"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 8HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Pond 1P: Subsurface Infiltration Basin
Inflow
Outflow
Discarded
Primary
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
1
0
Inflow Area=30,117 sf
Peak Elev=195.50'
Storage=1,234 cf
  1.5 cfs  
  0.4 cfs  
  0.4 cfs  
  0.0 cfs  

Page 261

Type III 24-hr  2-Year Rainfall=3.26"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 9HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Link DP-1: Hartford Avenue
Inflow Area = 12,127 sf, 20.66% Impervious,  Inflow Depth = 1.00"    for  2-Year event
Inflow = 0.2 cfs @ 12.15 hrs,  Volume= 1,008 cf
Primary = 0.2 cfs @ 12.15 hrs,  Volume= 1,008 cf,  Atten= 0%,  Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Link DP-1: Hartford Avenue
Inflow
Primary
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
0.24
0.23
0.22
0.21
0.2
0.19
0.18
0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
Inflow Area=12,127 sf
  0.2 cfs  
  0.2 cfs  

Page 262

Type III 24-hr  2-Year Rainfall=3.26"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 10HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Link DP-2: Off-Site Wetlands
Inflow Area = 99,066 sf, 23.48% Impervious,  Inflow Depth = 0.06"    for  2-Year event
Inflow = 0.1 cfs @ 12.19 hrs,  Volume= 502 cf
Primary = 0.1 cfs @ 12.19 hrs,  Volume= 502 cf,  Atten= 0%,  Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Link DP-2: Off-Site Wetlands
Inflow
Primary
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
Inflow Area=99,066 sf
  0.1 cfs  
  0.1 cfs  

Page 263

Type III 24-hr  10-Year Rainfall=4.86"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 11HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Stor-Ind+Trans method  -  Pond routing by Stor-Ind method
Runoff Area=12,127 sf   20.66% Impervious   Runoff Depth=1.98"Subcatchment PS-1: 
   Flow Length=100'   Tc=10.0 min   CN=WQ   Runoff=0.5 cfs  1,996 cf
Runoff Area=30,117 sf   75.92% Impervious   Runoff Depth=3.81"Subcatchment PS-2a: 
   Tc=10.0 min   CN=WQ   Runoff=2.4 cfs  9,556 cf
Runoff Area=68,949 sf   0.57% Impervious   Runoff Depth=0.31"Subcatchment PS-2b: 
   Flow Length=172'   Tc=10.0 min   CN=WQ   Runoff=0.3 cfs  1,769 cf
Peak Elev=196.40'  Storage=2,634 cf   Inflow=2.4 cfs  9,556 cfPond 1P: Subsurface Infiltration Basin
   Discarded=0.4 cfs  9,556 cf   Primary=0.0 cfs  0 cf   Outflow=0.4 cfs  9,556 cf
   Inflow=0.5 cfs  1,996 cfLink DP-1: Hartford Avenue
   Primary=0.5 cfs  1,996 cf
   Inflow=0.3 cfs  1,769 cfLink DP-2: Off-Site Wetlands
   Primary=0.3 cfs  1,769 cf
Total Runoff Area = 111,193 sf   Runoff Volume = 13,322 cf   Average Runoff Depth = 1.44"
76.83% Pervious = 85,427 sf     23.17% Impervious = 25,767 sf

Page 264

Type III 24-hr  10-Year Rainfall=4.86"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 12HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment PS-1: 
Runoff = 0.5 cfs @ 12.15 hrs,  Volume= 1,996 cf,  Depth= 1.98"
     Routed to Link DP-1 : Hartford Avenue
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  10-Year Rainfall=4.86"
Area (sf) CN Description
9,622 61 >75% Grass cover, Good, HSG B
2,505 98 Paved parking, HSG B
12,127 Weighted Average
9,622 61 79.34% Pervious Area
2,505 98 20.66% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
5.9 75 0.0420 0.21 Sheet Flow, 
Grass: Short   n= 0.150   P2= 3.11"
0.5 25 0.0100 0.78 Sheet Flow, 
Smooth surfaces   n= 0.011   P2= 3.11"
6.4 100 Total,  Increased to minimum Tc = 10.0 min
Subcatchment PS-1: 
Runoff
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Type III 24-hr
10-Year Rainfall=4.86"
Runoff Area=12,127 sf
Runoff Volume=1,996 cf
Runoff Depth=1.98"
Flow Length=100'
Tc=10.0 min
CN=WQ
  0.5 cfs  

Page 265

Type III 24-hr  10-Year Rainfall=4.86"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 13HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment PS-2a: 
Runoff = 2.4 cfs @ 12.14 hrs,  Volume= 9,556 cf,  Depth= 3.81"
     Routed to Pond 1P : Subsurface Infiltration Basin
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  10-Year Rainfall=4.86"
Area (sf) CN Description
19 39 >75% Grass cover, Good, HSG A
6,322 61 >75% Grass cover, Good, HSG B
9,107 98 Paved parking, HSG A
8,312 98 Paved parking, HSG B
5,447 98 Roofs, HSG B
911 55 Woods, Good, HSG B
30,117 Weighted Average
7,252 60 24.08% Pervious Area
22,865 98 75.92% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
10.0 Direct Entry, 
Subcatchment PS-2a: 
Runoff
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
2
1
0
Type III 24-hr
10-Year Rainfall=4.86"
Runoff Area=30,117 sf
Runoff Volume=9,556 cf
Runoff Depth=3.81"
Tc=10.0 min
CN=WQ
  2.4 cfs  

Page 266

Type III 24-hr  10-Year Rainfall=4.86"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 14HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment PS-2b: 
Runoff = 0.3 cfs @ 12.16 hrs,  Volume= 1,769 cf,  Depth= 0.31"
     Routed to Link DP-2 : Off-Site Wetlands
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  10-Year Rainfall=4.86"
Area (sf) CN Description
29,350 39 >75% Grass cover, Good, HSG A
6,505 61 >75% Grass cover, Good, HSG B
235 98 Paved parking, HSG A
161 98 Paved parking, HSG B
26,193 30 Woods, Good, HSG A
6,504 55 Woods, Good, HSG B
68,949 Weighted Average
68,553 39 99.43% Pervious Area
396 98 0.57% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.9 96 0.1870 0.41 Sheet Flow, 
Grass: Short   n= 0.150   P2= 3.11"
0.3 76 0.4300 4.59 Shallow Concentrated Flow, 
Short Grass Pasture   Kv= 7.0 fps
4.2 172 Total,  Increased to minimum Tc = 10.0 min
Subcatchment PS-2b: 
Runoff
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
0.34
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
Type III 24-hr
10-Year Rainfall=4.86"
Runoff Area=68,949 sf
Runoff Volume=1,769 cf
Runoff Depth=0.31"
Flow Length=172'
Tc=10.0 min
CN=WQ
  0.3 cfs  

Page 267

Type III 24-hr  10-Year Rainfall=4.86"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 15HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Pond 1P: Subsurface Infiltration Basin
Inflow Area = 30,117 sf, 75.92% Impervious,  Inflow Depth = 3.81"    for  10-Year event
Inflow = 2.4 cfs @ 12.14 hrs,  Volume= 9,556 cf
Outflow = 0.4 cfs @ 11.70 hrs,  Volume= 9,556 cf,  Atten= 84%,  Lag= 0.0 min
Discarded = 0.4 cfs @ 11.70 hrs,  Volume= 9,556 cf
Primary = 0.0 cfs @ 0.00 hrs,  Volume= 0 cf
     Routed to Link DP-2 : Off-Site Wetlands
Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Peak Elev= 196.40' @ 12.68 hrs   Surf.Area= 2,011 sf   Storage= 2,634 cf
Plug-Flow detention time= 40.0 min calculated for 9,550 cf (100% of inflow)
Center-of-Mass det. time= 40.0 min ( 802.2 - 762.2 )
Volume Invert Avail.Storage Storage Description
#1A 194.50' 1,915 cf 15.25'W x 131.87'L x 3.75'H Field A
7,541 cf Overall - 2,753 cf Embedded = 4,789 cf  x 40.0% Voids
#2A 195.00' 2,753 cf ADS_StormTech SC-800 +Cap  x 54  Inside #1
Effective Size= 45.0"W x 33.0"H => 7.11 sf x 7.12'L = 50.6 cf
Overall Size= 51.0"W x 33.0"H x 7.55'L with 0.43' Overlap
54 Chambers in 3 Rows
Cap Storage= 3.4 cf x 2 x 3 rows = 20.5 cf
4,668 cf Total Available Storage
     Storage Group A created with Chamber Wizard
Device Routing     Invert Outlet Devices
#1 Primary 195.00' 12.0"  Round Culvert   
L= 45.0'   RCP, groove end projecting,  Ke= 0.200   
Inlet / Outlet Invert= 195.00' / 194.10'   S= 0.0200 '/'   Cc= 0.900   
n= 0.013,  Flow Area= 0.79 sf   
#2 Device 1 197.25' 4.0' long Sharp-Crested Rectangular Weir   2 End Contraction(s)   
#3 Device 1 196.75' 12.0" W x 3.0" H Vert. Orifice    C= 0.600   
Limited to weir flow at low heads   
#4 Discarded 194.50' 8.270 in/hr Exfiltration over Surface area     Phase-In= 0.01'   
Discarded OutFlow  Max=0.4 cfs @ 11.70 hrs  HW=194.54'   (Free Discharge)
4=Exfiltration  (Exfiltration Controls 0.4 cfs)
Primary OutFlow  Max=0.0 cfs @ 0.00 hrs  HW=194.50'   (Free Discharge)
1=Culvert  ( Controls 0.0 cfs)
2=Sharp-Crested Rectangular Weir  ( Controls 0.0 cfs)
3=Orifice  ( Controls 0.0 cfs)

Page 268

Type III 24-hr  10-Year Rainfall=4.86"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 16HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Pond 1P: Subsurface Infiltration Basin
Inflow
Outflow
Discarded
Primary
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
2
1
0
Inflow Area=30,117 sf
Peak Elev=196.40'
Storage=2,634 cf
  2.4 cfs  
  0.4 cfs  
  0.4 cfs  
  0.0 cfs  

Page 269

Type III 24-hr  10-Year Rainfall=4.86"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 17HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Link DP-1: Hartford Avenue
Inflow Area = 12,127 sf, 20.66% Impervious,  Inflow Depth = 1.98"    for  10-Year event
Inflow = 0.5 cfs @ 12.15 hrs,  Volume= 1,996 cf
Primary = 0.5 cfs @ 12.15 hrs,  Volume= 1,996 cf,  Atten= 0%,  Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Link DP-1: Hartford Avenue
Inflow
Primary
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Inflow Area=12,127 sf
  0.5 cfs  
  0.5 cfs  

Page 270

Type III 24-hr  10-Year Rainfall=4.86"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 18HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Link DP-2: Off-Site Wetlands
Inflow Area = 99,066 sf, 23.48% Impervious,  Inflow Depth = 0.21"    for  10-Year event
Inflow = 0.3 cfs @ 12.16 hrs,  Volume= 1,769 cf
Primary = 0.3 cfs @ 12.16 hrs,  Volume= 1,769 cf,  Atten= 0%,  Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Link DP-2: Off-Site Wetlands
Inflow
Primary
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
0.34
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
Inflow Area=99,066 sf
  0.3 cfs  
  0.3 cfs  

Page 271

Type III 24-hr  25-Year Rainfall=6.11"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 19HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Stor-Ind+Trans method  -  Pond routing by Stor-Ind method
Runoff Area=12,127 sf   20.66% Impervious   Runoff Depth=2.86"Subcatchment PS-1: 
   Flow Length=100'   Tc=10.0 min   CN=WQ   Runoff=0.7 cfs  2,893 cf
Runoff Area=30,117 sf   75.92% Impervious   Runoff Depth=4.94"Subcatchment PS-2a: 
   Tc=10.0 min   CN=WQ   Runoff=3.1 cfs  12,405 cf
Runoff Area=68,949 sf   0.57% Impervious   Runoff Depth=0.61"Subcatchment PS-2b: 
   Flow Length=172'   Tc=10.0 min   CN=WQ   Runoff=0.6 cfs  3,529 cf
Peak Elev=197.03'  Storage=3,503 cf   Inflow=3.1 cfs  12,405 cfPond 1P: Subsurface Infiltration Basin
   Discarded=0.4 cfs  11,757 cf   Primary=0.5 cfs  647 cf   Outflow=0.8 cfs  12,405 cf
   Inflow=0.7 cfs  2,893 cfLink DP-1: Hartford Avenue
   Primary=0.7 cfs  2,893 cf
   Inflow=0.8 cfs  4,177 cfLink DP-2: Off-Site Wetlands
   Primary=0.8 cfs  4,177 cf
Total Runoff Area = 111,193 sf   Runoff Volume = 18,827 cf   Average Runoff Depth = 2.03"
76.83% Pervious = 85,427 sf     23.17% Impervious = 25,767 sf

Page 272

Type III 24-hr  25-Year Rainfall=6.11"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 20HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment PS-1: 
Runoff = 0.7 cfs @ 12.14 hrs,  Volume= 2,893 cf,  Depth= 2.86"
     Routed to Link DP-1 : Hartford Avenue
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  25-Year Rainfall=6.11"
Area (sf) CN Description
9,622 61 >75% Grass cover, Good, HSG B
2,505 98 Paved parking, HSG B
12,127 Weighted Average
9,622 61 79.34% Pervious Area
2,505 98 20.66% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
5.9 75 0.0420 0.21 Sheet Flow, 
Grass: Short   n= 0.150   P2= 3.11"
0.5 25 0.0100 0.78 Sheet Flow, 
Smooth surfaces   n= 0.011   P2= 3.11"
6.4 100 Total,  Increased to minimum Tc = 10.0 min
Subcatchment PS-1: 
Runoff
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
0.8
0.75
0.7
0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Type III 24-hr
25-Year Rainfall=6.11"
Runoff Area=12,127 sf
Runoff Volume=2,893 cf
Runoff Depth=2.86"
Flow Length=100'
Tc=10.0 min
CN=WQ
  0.7 cfs  

Page 273

Type III 24-hr  25-Year Rainfall=6.11"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 21HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment PS-2a: 
Runoff = 3.1 cfs @ 12.14 hrs,  Volume= 12,405 cf,  Depth= 4.94"
     Routed to Pond 1P : Subsurface Infiltration Basin
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  25-Year Rainfall=6.11"
Area (sf) CN Description
19 39 >75% Grass cover, Good, HSG A
6,322 61 >75% Grass cover, Good, HSG B
9,107 98 Paved parking, HSG A
8,312 98 Paved parking, HSG B
5,447 98 Roofs, HSG B
911 55 Woods, Good, HSG B
30,117 Weighted Average
7,252 60 24.08% Pervious Area
22,865 98 75.92% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
10.0 Direct Entry, 
Subcatchment PS-2a: 
Runoff
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
3
2
1
0
Type III 24-hr
25-Year Rainfall=6.11"
Runoff Area=30,117 sf
Runoff Volume=12,405 cf
Runoff Depth=4.94"
Tc=10.0 min
CN=WQ
  3.1 cfs  

Page 274

Type III 24-hr  25-Year Rainfall=6.11"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 22HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment PS-2b: 
Runoff = 0.6 cfs @ 12.17 hrs,  Volume= 3,529 cf,  Depth= 0.61"
     Routed to Link DP-2 : Off-Site Wetlands
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  25-Year Rainfall=6.11"
Area (sf) CN Description
29,350 39 >75% Grass cover, Good, HSG A
6,505 61 >75% Grass cover, Good, HSG B
235 98 Paved parking, HSG A
161 98 Paved parking, HSG B
26,193 30 Woods, Good, HSG A
6,504 55 Woods, Good, HSG B
68,949 Weighted Average
68,553 39 99.43% Pervious Area
396 98 0.57% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.9 96 0.1870 0.41 Sheet Flow, 
Grass: Short   n= 0.150   P2= 3.11"
0.3 76 0.4300 4.59 Shallow Concentrated Flow, 
Short Grass Pasture   Kv= 7.0 fps
4.2 172 Total,  Increased to minimum Tc = 10.0 min
Subcatchment PS-2b: 
Runoff
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Type III 24-hr
25-Year Rainfall=6.11"
Runoff Area=68,949 sf
Runoff Volume=3,529 cf
Runoff Depth=0.61"
Flow Length=172'
Tc=10.0 min
CN=WQ
  0.6 cfs  

Page 275

Type III 24-hr  25-Year Rainfall=6.11"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 23HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Pond 1P: Subsurface Infiltration Basin
Inflow Area = 30,117 sf, 75.92% Impervious,  Inflow Depth = 4.94"    for  25-Year event
Inflow = 3.1 cfs @ 12.14 hrs,  Volume= 12,405 cf
Outflow = 0.8 cfs @ 12.54 hrs,  Volume= 12,405 cf,  Atten= 73%,  Lag= 24.1 min
Discarded = 0.4 cfs @ 11.61 hrs,  Volume= 11,757 cf
Primary = 0.5 cfs @ 12.54 hrs,  Volume= 647 cf
     Routed to Link DP-2 : Off-Site Wetlands
Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Peak Elev= 197.03' @ 12.54 hrs   Surf.Area= 2,011 sf   Storage= 3,503 cf
Plug-Flow detention time= 50.8 min calculated for 12,397 cf (100% of inflow)
Center-of-Mass det. time= 50.8 min ( 810.7 - 760.0 )
Volume Invert Avail.Storage Storage Description
#1A 194.50' 1,915 cf 15.25'W x 131.87'L x 3.75'H Field A
7,541 cf Overall - 2,753 cf Embedded = 4,789 cf  x 40.0% Voids
#2A 195.00' 2,753 cf ADS_StormTech SC-800 +Cap  x 54  Inside #1
Effective Size= 45.0"W x 33.0"H => 7.11 sf x 7.12'L = 50.6 cf
Overall Size= 51.0"W x 33.0"H x 7.55'L with 0.43' Overlap
54 Chambers in 3 Rows
Cap Storage= 3.4 cf x 2 x 3 rows = 20.5 cf
4,668 cf Total Available Storage
     Storage Group A created with Chamber Wizard
Device Routing     Invert Outlet Devices
#1 Primary 195.00' 12.0"  Round Culvert   
L= 45.0'   RCP, groove end projecting,  Ke= 0.200   
Inlet / Outlet Invert= 195.00' / 194.10'   S= 0.0200 '/'   Cc= 0.900   
n= 0.013,  Flow Area= 0.79 sf   
#2 Device 1 197.25' 4.0' long Sharp-Crested Rectangular Weir   2 End Contraction(s)   
#3 Device 1 196.75' 12.0" W x 3.0" H Vert. Orifice    C= 0.600   
Limited to weir flow at low heads   
#4 Discarded 194.50' 8.270 in/hr Exfiltration over Surface area     Phase-In= 0.01'   
Discarded OutFlow  Max=0.4 cfs @ 11.61 hrs  HW=194.54'   (Free Discharge)
4=Exfiltration  (Exfiltration Controls 0.4 cfs)
Primary OutFlow  Max=0.5 cfs @ 12.54 hrs  HW=197.03'   (Free Discharge)
1=Culvert  (Passes 0.5 cfs of 5.4 cfs potential flow)
2=Sharp-Crested Rectangular Weir  ( Controls 0.0 cfs)
3=Orifice  (Orifice Controls 0.5 cfs @ 1.83 fps)

Page 276

Type III 24-hr  25-Year Rainfall=6.11"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 24HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Pond 1P: Subsurface Infiltration Basin
Inflow
Outflow
Discarded
Primary
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
3
2
1
0
Inflow Area=30,117 sf
Peak Elev=197.03'
Storage=3,503 cf
  3.1 cfs  
  0.8 cfs  
  0.4 cfs    0.5 cfs  

Page 277

Type III 24-hr  25-Year Rainfall=6.11"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 25HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Link DP-1: Hartford Avenue
Inflow Area = 12,127 sf, 20.66% Impervious,  Inflow Depth = 2.86"    for  25-Year event
Inflow = 0.7 cfs @ 12.14 hrs,  Volume= 2,893 cf
Primary = 0.7 cfs @ 12.14 hrs,  Volume= 2,893 cf,  Atten= 0%,  Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Link DP-1: Hartford Avenue
Inflow
Primary
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
0.8
0.75
0.7
0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Inflow Area=12,127 sf
  0.7 cfs  
  0.7 cfs  

Page 278

Type III 24-hr  25-Year Rainfall=6.11"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 26HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Link DP-2: Off-Site Wetlands
Inflow Area = 99,066 sf, 23.48% Impervious,  Inflow Depth = 0.51"    for  25-Year event
Inflow = 0.8 cfs @ 12.49 hrs,  Volume= 4,177 cf
Primary = 0.8 cfs @ 12.49 hrs,  Volume= 4,177 cf,  Atten= 0%,  Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Link DP-2: Off-Site Wetlands
Inflow
Primary
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
0.85
0.8
0.75
0.7
0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Inflow Area=99,066 sf
  0.8 cfs  
  0.8 cfs  

Page 279

Type III 24-hr  100-Year Rainfall=8.63"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 27HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Stor-Ind+Trans method  -  Pond routing by Stor-Ind method
Runoff Area=12,127 sf   20.66% Impervious   Runoff Depth=4.85"Subcatchment PS-1: 
   Flow Length=100'   Tc=10.0 min   CN=WQ   Runoff=1.3 cfs  4,904 cf
Runoff Area=30,117 sf   75.92% Impervious   Runoff Depth=7.29"Subcatchment PS-2a: 
   Tc=10.0 min   CN=WQ   Runoff=4.5 cfs  18,305 cf
Runoff Area=68,949 sf   0.57% Impervious   Runoff Depth=1.55"Subcatchment PS-2b: 
   Flow Length=172'   Tc=10.0 min   CN=WQ   Runoff=1.8 cfs  8,913 cf
Peak Elev=197.51'  Storage=4,053 cf   Inflow=4.5 cfs  18,305 cfPond 1P: Subsurface Infiltration Basin
   Discarded=0.4 cfs  14,728 cf   Primary=2.6 cfs  3,577 cf   Outflow=3.0 cfs  18,305 cf
   Inflow=1.3 cfs  4,904 cfLink DP-1: Hartford Avenue
   Primary=1.3 cfs  4,904 cf
   Inflow=4.2 cfs  12,490 cfLink DP-2: Off-Site Wetlands
   Primary=4.2 cfs  12,490 cf
Total Runoff Area = 111,193 sf   Runoff Volume = 32,122 cf   Average Runoff Depth = 3.47"
76.83% Pervious = 85,427 sf     23.17% Impervious = 25,767 sf

Page 280

Type III 24-hr  100-Year Rainfall=8.63"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 28HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment PS-1: 
Runoff = 1.3 cfs @ 12.14 hrs,  Volume= 4,904 cf,  Depth= 4.85"
     Routed to Link DP-1 : Hartford Avenue
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  100-Year Rainfall=8.63"
Area (sf) CN Description
9,622 61 >75% Grass cover, Good, HSG B
2,505 98 Paved parking, HSG B
12,127 Weighted Average
9,622 61 79.34% Pervious Area
2,505 98 20.66% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
5.9 75 0.0420 0.21 Sheet Flow, 
Grass: Short   n= 0.150   P2= 3.11"
0.5 25 0.0100 0.78 Sheet Flow, 
Smooth surfaces   n= 0.011   P2= 3.11"
6.4 100 Total,  Increased to minimum Tc = 10.0 min
Subcatchment PS-1: 
Runoff
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
1
0
Type III 24-hr
100-Year Rainfall=8.63"
Runoff Area=12,127 sf
Runoff Volume=4,904 cf
Runoff Depth=4.85"
Flow Length=100'
Tc=10.0 min
CN=WQ
  1.3 cfs  

Page 281

Type III 24-hr  100-Year Rainfall=8.63"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 29HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment PS-2a: 
Runoff = 4.5 cfs @ 12.13 hrs,  Volume= 18,305 cf,  Depth= 7.29"
     Routed to Pond 1P : Subsurface Infiltration Basin
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  100-Year Rainfall=8.63"
Area (sf) CN Description
19 39 >75% Grass cover, Good, HSG A
6,322 61 >75% Grass cover, Good, HSG B
9,107 98 Paved parking, HSG A
8,312 98 Paved parking, HSG B
5,447 98 Roofs, HSG B
911 55 Woods, Good, HSG B
30,117 Weighted Average
7,252 60 24.08% Pervious Area
22,865 98 75.92% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
10.0 Direct Entry, 
Subcatchment PS-2a: 
Runoff
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
5
4
3
2
1
0
Type III 24-hr
100-Year Rainfall=8.63"
Runoff Area=30,117 sf
Runoff Volume=18,305 cf
Runoff Depth=7.29"
Tc=10.0 min
CN=WQ
  4.5 cfs  

Page 282

Type III 24-hr  100-Year Rainfall=8.63"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 30HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment PS-2b: 
Runoff = 1.8 cfs @ 12.16 hrs,  Volume= 8,913 cf,  Depth= 1.55"
     Routed to Link DP-2 : Off-Site Wetlands
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  100-Year Rainfall=8.63"
Area (sf) CN Description
29,350 39 >75% Grass cover, Good, HSG A
6,505 61 >75% Grass cover, Good, HSG B
235 98 Paved parking, HSG A
161 98 Paved parking, HSG B
26,193 30 Woods, Good, HSG A
6,504 55 Woods, Good, HSG B
68,949 Weighted Average
68,553 39 99.43% Pervious Area
396 98 0.57% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.9 96 0.1870 0.41 Sheet Flow, 
Grass: Short   n= 0.150   P2= 3.11"
0.3 76 0.4300 4.59 Shallow Concentrated Flow, 
Short Grass Pasture   Kv= 7.0 fps
4.2 172 Total,  Increased to minimum Tc = 10.0 min
Subcatchment PS-2b: 
Runoff
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
2
1
0
Type III 24-hr
100-Year Rainfall=8.63"
Runoff Area=68,949 sf
Runoff Volume=8,913 cf
Runoff Depth=1.55"
Flow Length=172'
Tc=10.0 min
CN=WQ
  1.8 cfs  

Page 283

Type III 24-hr  100-Year Rainfall=8.63"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 31HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Pond 1P: Subsurface Infiltration Basin
Inflow Area = 30,117 sf, 75.92% Impervious,  Inflow Depth = 7.29"    for  100-Year event
Inflow = 4.5 cfs @ 12.13 hrs,  Volume= 18,305 cf
Outflow = 3.0 cfs @ 12.27 hrs,  Volume= 18,305 cf,  Atten= 33%,  Lag= 7.9 min
Discarded = 0.4 cfs @ 11.25 hrs,  Volume= 14,728 cf
Primary = 2.6 cfs @ 12.27 hrs,  Volume= 3,577 cf
     Routed to Link DP-2 : Off-Site Wetlands
Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Peak Elev= 197.51' @ 12.27 hrs   Surf.Area= 2,011 sf   Storage= 4,053 cf
Plug-Flow detention time= 46.7 min calculated for 18,293 cf (100% of inflow)
Center-of-Mass det. time= 46.7 min ( 803.5 - 756.8 )
Volume Invert Avail.Storage Storage Description
#1A 194.50' 1,915 cf 15.25'W x 131.87'L x 3.75'H Field A
7,541 cf Overall - 2,753 cf Embedded = 4,789 cf  x 40.0% Voids
#2A 195.00' 2,753 cf ADS_StormTech SC-800 +Cap  x 54  Inside #1
Effective Size= 45.0"W x 33.0"H => 7.11 sf x 7.12'L = 50.6 cf
Overall Size= 51.0"W x 33.0"H x 7.55'L with 0.43' Overlap
54 Chambers in 3 Rows
Cap Storage= 3.4 cf x 2 x 3 rows = 20.5 cf
4,668 cf Total Available Storage
     Storage Group A created with Chamber Wizard
Device Routing     Invert Outlet Devices
#1 Primary 195.00' 12.0"  Round Culvert   
L= 45.0'   RCP, groove end projecting,  Ke= 0.200   
Inlet / Outlet Invert= 195.00' / 194.10'   S= 0.0200 '/'   Cc= 0.900   
n= 0.013,  Flow Area= 0.79 sf   
#2 Device 1 197.25' 4.0' long Sharp-Crested Rectangular Weir   2 End Contraction(s)   
#3 Device 1 196.75' 12.0" W x 3.0" H Vert. Orifice    C= 0.600   
Limited to weir flow at low heads   
#4 Discarded 194.50' 8.270 in/hr Exfiltration over Surface area     Phase-In= 0.01'   
Discarded OutFlow  Max=0.4 cfs @ 11.25 hrs  HW=194.54'   (Free Discharge)
4=Exfiltration  (Exfiltration Controls 0.4 cfs)
Primary OutFlow  Max=2.6 cfs @ 12.27 hrs  HW=197.51'   (Free Discharge)
1=Culvert  (Passes 2.6 cfs of 6.0 cfs potential flow)
2=Sharp-Crested Rectangular Weir  (Weir Controls 1.7 cfs @ 1.66 fps)
3=Orifice  (Orifice Controls 1.0 cfs @ 3.82 fps)

Page 284

Type III 24-hr  100-Year Rainfall=8.63"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 32HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Pond 1P: Subsurface Infiltration Basin
Inflow
Outflow
Discarded
Primary
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
5
4
3
2
1
0
Inflow Area=30,117 sf
Peak Elev=197.51'
Storage=4,053 cf
  4.5 cfs  
  3.0 cfs  
  0.4 cfs  
  2.6 cfs  

Page 285

Type III 24-hr  100-Year Rainfall=8.63"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 33HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Link DP-1: Hartford Avenue
Inflow Area = 12,127 sf, 20.66% Impervious,  Inflow Depth = 4.85"    for  100-Year event
Inflow = 1.3 cfs @ 12.14 hrs,  Volume= 4,904 cf
Primary = 1.3 cfs @ 12.14 hrs,  Volume= 4,904 cf,  Atten= 0%,  Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Link DP-1: Hartford Avenue
Inflow
Primary
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
1
0
Inflow Area=12,127 sf
  1.3 cfs  
  1.3 cfs  

Page 286

Type III 24-hr  100-Year Rainfall=8.63"251219 - POST
  Printed  6/1/2026Prepared by R Levesque Associates
Page 34HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Link DP-2: Off-Site Wetlands
Inflow Area = 99,066 sf, 23.48% Impervious,  Inflow Depth = 1.51"    for  100-Year event
Inflow = 4.2 cfs @ 12.26 hrs,  Volume= 12,490 cf
Primary = 4.2 cfs @ 12.26 hrs,  Volume= 12,490 cf,  Atten= 0%,  Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Link DP-2: Off-Site Wetlands
Inflow
Primary
Hydrograph
Time  (hours)
484644424038363432302826242220181614121086420
Flow  (cfs)
4
3
2
1
0
Inflow Area=99,066 sf
  4.2 cfs  
  4.2 cfs  

Page 287

 

Page 288

Page 289

PCB-1 PCB-2 PYD-1 PYD-2 PYD-3
RF-1 RF-2 RF-3
Routing Diagram for 251219 - INLET
Prepared by R Levesque Associates,  Printed 5/28/2026
HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Subcat Reach Pond Link

Page 290

Type III 24-hr  10-Year Rainfall=4.86"251219 - INLET
  Printed  5/28/2026Prepared by R Levesque Associates
Page 2HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment PCB-1: 
Runoff = 0.6 cfs @ 12.13 hrs,  Volume= 2,462 cf,  Depth= 4.48"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  10-Year Rainfall=4.86"
Area (sf) CN Description
292 61 >75% Grass cover, Good, HSG B
2,799 98 Paved parking, HSG A
3,510 98 Paved parking, HSG B
6,601 Weighted Average
292 61 4.42% Pervious Area
6,309 98 95.58% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
10.0 Direct Entry, 
Summary for Subcatchment PCB-2: 
Runoff = 1.1 cfs @ 12.13 hrs,  Volume= 4,457 cf,  Depth= 4.15"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  10-Year Rainfall=4.86"
Area (sf) CN Description
19 39 >75% Grass cover, Good, HSG A
1,613 61 >75% Grass cover, Good, HSG B
6,308 98 Paved parking, HSG A
4,694 98 Paved parking, HSG B
88 98 Roofs, HSG B
154 55 Woods, Good, HSG B
12,876 Weighted Average
1,786 60 13.87% Pervious Area
11,090 98 86.13% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
10.0 Direct Entry, 
Summary for Subcatchment PYD-1: 
Runoff = 0.0 cfs @ 12.16 hrs,  Volume= 101 cf,  Depth= 1.29"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  10-Year Rainfall=4.86"

Page 291

Type III 24-hr  10-Year Rainfall=4.86"251219 - INLET
  Printed  5/28/2026Prepared by R Levesque Associates
Page 3HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Area (sf) CN Description
938 61 >75% Grass cover, Good, HSG B
2 98 Roofs, HSG B
940 Weighted Average
938 61 99.84% Pervious Area
2 98 0.16% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
10.0 Direct Entry, 
Summary for Subcatchment PYD-2: 
Runoff = 0.1 cfs @ 12.16 hrs,  Volume= 210 cf,  Depth= 1.16"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  10-Year Rainfall=4.86"
Area (sf) CN Description
1,421 61 >75% Grass cover, Good, HSG B
0 98 Roofs, HSG B
757 55 Woods, Good, HSG B
2,178 Weighted Average
2,178 59 99.99% Pervious Area
0 98 0.01% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
10.0 Direct Entry, 
Summary for Subcatchment PYD-3: 
Runoff = 0.1 cfs @ 12.16 hrs,  Volume= 220 cf,  Depth= 1.29"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  10-Year Rainfall=4.86"
Area (sf) CN Description
2,056 61 >75% Grass cover, Good, HSG B
2,056 61 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
10.0 Direct Entry, 

Page 292

Type III 24-hr  10-Year Rainfall=4.86"251219 - INLET
  Printed  5/28/2026Prepared by R Levesque Associates
Page 4HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment RF-1: 
Runoff = 0.1 cfs @ 12.13 hrs,  Volume= 515 cf,  Depth= 4.62"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  10-Year Rainfall=4.86"
Area (sf) CN Description
1,336 98 Roofs, HSG B
1,336 98 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
10.0 Direct Entry, 
Summary for Subcatchment RF-2: 
Runoff = 0.1 cfs @ 12.13 hrs,  Volume= 515 cf,  Depth= 4.62"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  10-Year Rainfall=4.86"
Area (sf) CN Description
0 61 >75% Grass cover, Good, HSG B
1,337 98 Roofs, HSG B
1,337 Weighted Average
0 61 0.02% Pervious Area
1,337 98 99.98% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
10.0 Direct Entry, 
Summary for Subcatchment RF-3: 
Runoff = 0.3 cfs @ 12.13 hrs,  Volume= 1,034 cf,  Depth= 4.62"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs
Type III 24-hr  10-Year Rainfall=4.86"
Area (sf) CN Description
2 61 >75% Grass cover, Good, HSG B
2,684 98 Roofs, HSG B
2,685 Weighted Average
2 61 0.07% Pervious Area
2,684 98 99.93% Impervious Area

Page 293

Type III 24-hr  10-Year Rainfall=4.86"251219 - INLET
  Printed  5/28/2026Prepared by R Levesque Associates
Page 5HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
10.0 Direct Entry, 

Page 294

Page 295

Page 296

Page 297

 

Page 298

Page 299

 
 
7353 SF
25,767 SF
18,414 SF
22,866 SF
Total Existing Impervious Area
Total Proposed Impervious Area
Total New Impervious Area
Total Impervious Area Tributary 
to Recharge Facilities

Page 300

 
 
The volume retained in the subsurface infiltration basin below the lowest outlet invert exceeds 
the required water quality volume. Retaining 100% of the required water quality volume 
satisfies standard 1 and does not require further calculations for additional pollutan removal.

Page 301

Type III 24-hr  100-Year Rainfall=8.63"251219 - POST
  Printed  5/28/2026Prepared by R Levesque Associates
HydroCAD® 10.20-8a  s/n 02175  © 2025 HydroCAD Software Solutions LLC
Stage-Area-Storage for Pond 1P: Subsurface Infiltration Basin (continued)
Elevation
(feet)
Surface
(sq-ft)
Storage
(cubic-feet)
196.58 2,011 2,891
196.59 2,011 2,906
196.60 2,011 2,920
196.61 2,011 2,934
196.62 2,011 2,948
196.63 2,011 2,963
196.64 2,011 2,977
196.65 2,011 2,991
196.66 2,011 3,005
196.67 2,011 3,019
196.68 2,011 3,033
196.69 2,011 3,047
196.70 2,011 3,061
196.71 2,011 3,075
196.72 2,011 3,089
196.73 2,011 3,103
196.74 2,011 3,117
196.75 2,011 3,130
196.76 2,011 3,144
196.77 2,011 3,158
196.78 2,011 3,172
196.79 2,011 3,185
196.80 2,011 3,199
196.81 2,011 3,213
196.82 2,011 3,226
196.83 2,011 3,240
196.84 2,011 3,254
196.85 2,011 3,267
196.86 2,011 3,281
196.87 2,011 3,294
196.88 2,011 3,307
196.89 2,011 3,321
196.90 2,011 3,334
196.91 2,011 3,347
196.92 2,011 3,361
196.93 2,011 3,374
196.94 2,011 3,387
196.95 2,011 3,400
196.96 2,011 3,413
196.97 2,011 3,427
196.98 2,011 3,440
196.99 2,011 3,453
197.00 2,011 3,466
197.01 2,011 3,478
197.02 2,011 3,491
197.03 2,011 3,504
197.04 2,011 3,517
197.05 2,011 3,530
197.06 2,011 3,543
197.07 2,011 3,555
197.08 2,011 3,568
197.09 2,011 3,580
Elevation
(feet)
Surface
(sq-ft)
Storage
(cubic-feet)
197.10 2,011 3,593
197.11 2,011 3,606
197.12 2,011 3,618
197.13 2,011 3,630
197.14 2,011 3,643
197.15 2,011 3,655
197.16 2,011 3,667
197.17 2,011 3,680
197.18 2,011 3,692
197.19 2,011 3,704
197.20 2,011 3,716
197.21 2,011 3,728
197.22 2,011 3,740
197.23 2,011 3,752
197.24 2,011 3,764
197.25 2,011 3,776
197.26 2,011 3,787
197.27 2,011 3,799
197.28 2,011 3,811
197.29 2,011 3,822
197.30 2,011 3,834
197.31 2,011 3,845
197.32 2,011 3,856
197.33 2,011 3,868
197.34 2,011 3,879
197.35 2,011 3,890
197.36 2,011 3,901
197.37 2,011 3,912
197.38 2,011 3,923
197.39 2,011 3,934
197.40 2,011 3,944
197.41 2,011 3,955
197.42 2,011 3,966
197.43 2,011 3,976
197.44 2,011 3,986
197.45 2,011 3,996
197.46 2,011 4,006
197.47 2,011 4,016
197.48 2,011 4,026
197.49 2,011 4,036
197.50 2,011 4,046
197.51 2,011 4,055
197.52 2,011 4,065
197.53 2,011 4,074
197.54 2,011 4,083
197.55 2,011 4,093
197.56 2,011 4,102
197.57 2,011 4,111
197.58 2,011 4,120
197.59 2,011 4,129
197.60 2,011 4,138
197.61 2,011 4,147

Page 302

 
 

Page 303

Barracuda®  Max
The Barracuda Max is market-changing stormwater quality technology. This high-performance vortex 
hydrodynamic separator is designed to remove total suspended solids in order to protect our precious receiving 
waters. The Barracuda Max is also an outstanding value that offers multiple pipe configurations, and quick 
installation. The “Max” version of the Barracuda is built on the base platform of the original ADS Barracuda with 
improved removal efficiencies and installation components.  
Features
• Single manhole design
• No elevation loss between the inlet and outlet
• Variable inlet/outlet angle configurations (not just 
180 degree orientation)
• Internal bypass for inline installation (where 
applicable)
• Revolutionary, patent pending “teeth” mitigate 
turbulence in the sump area to prevent 
resuspension of captured contaminants
• Available with grated drop inlet configuration
• Available with trash and/or oil capture add-ons
Benefits 
• Internal components are in stock for quick delivery
• The S3, S4, S6, and S8 can be installed in a standard 
36” (900 mm), 48” (1200 m), 72” (1800 m), and 
96” (2400 m) precast manhole, respectively
• The S3 & S4 can be provided factory installed 
within a 36” (900 mm) and 48” (1200 mm) ADS 
HP manhole and delivered to the jobsite
• The Barracuda Max “teeth” and deflector 
plate apparatus are fabricated and designed 
for quick and easy field assembly
• Designed for easy maintenance using a 
vacuum truck or similar equipment.
• Inspection and maintenance are performed 
from the surface with no confined space entry

Page 304

Barrucuda Specification
Materials and Design
• Concrete Structures: Designed for H-20 traffic loading and applicable soil loads or 
as otherwise determined by a Licensed Professional Engineer. The materials and 
structural design of the devices shall be per ASTM C857 and ASTM C858. 
• 36” (900 mm) and 48” (1200 mm) HP Manhole Structures:  Made from an impact modified 
copolymer polypropylene meeting the material requirements of ASTM F2764.  The eccentric 
cone reducer shall be manufactured from polyethylene material meeting ASTM D3350 cell class 
213320C.  Gaskets shall be made of material meeting the requirements of ASTM F477. 
• Separator internals shall be substantially constructed of stainless steel, polyethylene 
or other thermoplastic material approved by the manufacturer.
Performance
• The stormwater treatment unit shall be an inline unit capable of conveying 100% of the design peak 
flow.  If peak flow rates exceed maximum hydraulic rate, the unit shall be installed offline.  
• The Barracuda Max unit shall be designed to remove at least 80% of the suspended solids on an annual 
aggregate removal basis. Said removal shall be based on full-scale third party testing using OK-110 
media gradation or equivalent and 300 mg/L influent concentration. Said full scale testing shall have 
included sediment capture based on actual total mass collected by the stormwater treatment unit.  
- OR -
The Barracuda Max unit shall be designed to remove at least 50% of TSS using a media mix with d50=75 micron  
and 200 mg/L influent concentration.
- OR -
The Barracuda Max unit shall be designed to remove at least 50% of TSS per current NJDEP/NJCAT  
HDS protocol.
• The stormwater treatment unit internals shall consist of (1) separator cone assembly, and (1) sump assembly,  
which includes the “teeth”.
Installation
Installation of the stormwater treatment unit(s) shall be performed per manufacturer’s 
installation instructions.  Such instructions can be obtained by calling Advanced 
Drainage Systems at 800-821-6710 or by logging on to www.adspipe.com.
Barracuda Max  
Model
Manhole 
Diameter
OK-110  
(80% removal)
Pretreatment for 
Infiltration1
S3 36” (900 mm) 0.86 CFS (24.1 L/s) 1.65 CFS (46.7 L/s)
S4 48” (1200 mm) 1.52 CFS (43.0 L/s) 2.94 CFS (83.3 L/s)
S6 72” (1800 mm) 3.42 CFS (96.8 L/s) 6.62 CFS (187.5 L/s)
S8 96” (2400 mm) 6.08 CFS (172.2 L/s) 11.76 CFS (333.0 L/s)
ADS “Terms and Conditions of Sale” are available on the website, www.ads-pipe.com .  The ADS logo, 
Barracuda logo, and the Green Stripe are registered trademarks of Advanced Drainage Systems, Inc. 
© 2022 Advanced Drainage Systems, Inc.  4/22 CS
adspipe.com
800-821-6710
ADS N-12® ST IB Pipe 
(per ASTM F2648)
* Peak bypass flows are dependent on final design
1   50% removal of OK-110.

Page 305

 
One of Barracuda’s advantages is the ease of maintenance. Like any system that collects pollutants, the 
Barracuda must be maintained for continued effectiveness. Maintenance is a simple procedure performed 
using a vacuum truck or similar equipment. The systems were designed to minimize the volume of water 
removed during routine maintenance, reducing disposal costs. 
Contractors can access the pollutants stored in the manhole through the manhole cover. This allows them 
to gain vacuum hose access to the bottom of the manhole to remove sediment and trash. There is no 
confined space entry necessary for inspection or maintenance. 
The entire maintenance procedure typically takes 2 to 4 hours, depending on the system’s size, the captured 
material, and the vacuum truck’s capacity. 
Local regulations may apply to the maintenance procedure. Safe and legal disposal of pollutants is the 
responsibility of the maintenance contractor. Maintenance should be performed only by a qualified 
contractor. 
 
Inspection and Cleaning Cycle   
Periodic inspection is needed to determine the need for and frequency of maintenance. You should begin 
inspecting as soon as construction is complete and then on an annual basis. Typically, the system needs to 
be cleaned every 1-3 years. 
Excessive oils, fuels or sediments may reduce the maintenance cycle. Periodic inspection is important. 
 
Determining When to Clean   
To determine the sediment depth, the maintenance contractor should lower a stadia rod into the  
manhole until it contacts the top of the captured sediment and mark that spot on the rod. Then push  
the probe through to the bottom of the sump and mark that spot to determine sediment depth. 
Maintenance should occur when the sediment has reached the levels indicated in the Storage 
Capacity Chart. 
 
 
 
adspipe.com 
1-800-821-6710 
 

Page 306

Barracuda Storage Capacities 
Model 
Manhole 
Diameter  
in. (mm) 
Total System 
Volume 
Gallons (Liters) 
Treatment 
Chamber Capacity 
Gallons (Liters) 
Standard Sediment 
Capacity (20” depth) 
Yards3 (meters3) 
NJDEP Sediment 
Capacity (50% of 
standard depth) 
Yards3 (meters3) 
S3 36 (900) 264 (999) 212 (803) 0.44 (0.34) 0.22 (0.17) 
S4 48 (1200) 665 (2517) 564 (2135) 0.78 (0.60) 0.39 (0.30) 
S6 72 (1800) 1497 (5667) 1269 (4804) 1.75 (1.34) 0.88 (0.67) 
S8 96 (2400) 4196 (15884) 3835 (14517) 3.10 (2.37) 1.55 (1.19) 
 
 
Maintenance Instructions  
1. Remove the manhole cover to provide access to the 
pollutant storage.  Pollutants are stored in the sump, below 
the bowl assembly visible from the surface.  Access this area 
through the 8” (200 mm), 10” (250 mm), 15” (375 mm) or 
20” (500 mm) diameter access cylinder.   
2. Use a vacuum truck or other similar equipment to remove 
all water, debris, oils and sediment. See figure 1. 
3. Use a high pressure hose to clean the manhole of all the 
remaining sediment and debris. Then, use the vacuum truck 
to remove the water. 
4. Fill the cleaned manhole with water until the level reaches 
the invert of the outlet pipe.  
5. Replace the manhole cover. 
6. Dispose of the polluted water, oils, sediment and trash at an 
approved facility. 
a. Local regulations prohibit the discharge of solid material into the sanitary system. Check with the  
local sewer authority for authority to discharge the liquid. 
b. Some localities treat the pollutants as leachate. Check with local regulators about disposal 
requirements. 
c. Additional local regulations may apply to the maintenance procedure. 
 
 
 
 
adspipe.com 
1-800-821-6710 
 
Figure 1 
ADS “Terms and Conditions of Sale” are available on the ADS website, www.ads-pipe.com 
The ADS logo, Barracuda® and the Green Stripe are registered trademarks of Advanced Drainage Systems, Inc.  
© 2022 Advanced Drainage Systems, Inc.   MG1.01  08/22 CS 

Page 307

 

Page 308

Page 309

 

Page 310

 
 
 
 
 
 
 
 

Page 311

 
 
 
 
 
 
 

Page 312

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Page 313

 

Page 314

Page 315

 
 

Page 316

 
 
 

Page 317

 
 
 
 
 
 
 
 
 
 
 
 
 

Page 318

 
 
 
 
 
 
 
 
 
 

Page 319

 
 
 
 
 
 
 
 
 
 

Page 320

 
 

Page 321

Page 322

Page 323

 

Page 324

Page 325

Page 326

Page 327

 

Page 328

Page 329

 
 

Page 330

 
 

Page 331

 
 
A. Provide low-maintenance, native vegetation that encourages water retention and minimizes the use of 
lawns, fertilizers, and pesticides.  
 
 
B. Minimize new impervious surfaces.  
 
 
C. Match as closely as possible the pre-development or natural site runoff characteristics in terms of 
volume and timing of runoff (mimic the natural water cycle).  
 
 
 
 
 
 
 
 
 
 
 

Page 332

 
 
A. Break up or disconnect the flow of runoff from impervious surfaces by directing it to adjacent pervious, 
vegetated surfaces (disconnect).  
 
 
B. Infiltrate precipitation as close as possible to the point it reaches the ground using multiple, small-scale 
structural stormwater BMPs distributed throughout a site (decentralize and distribute).  
 
 
C. Utilize less complex, non-structural methods for stormwater management that are lower cost and lower 
maintenance than conventional structural controls.  
 
 
D. Provide source controls to prevent or minimize the use or exposure of pollutants into stormwater runoff 
at the site in order to prevent or minimize the release of those pollutants into stormwater runoff.  
 
 

Page 333

Kevin Clark, PEL 
Town Engineer 
Town of Granby 
15 North Granby Road  
Granby, CT 06035                                                
 CT: (860) 844-5318 
E-MAIL: townengineer@granby-ct.gov 
 
 
Page 1 of 2 
 
 
 
Plan Review 
 
June 15, 2026 
 
“Site Plans, Residential Development, 37  Hartford Avenue – Granby, CT 06035, Mr. Forest Dvine, 129 
Lovers Lane, Granville, MA 01034, by R Levesque Associates, Inc., Francis Real Estate Holdings, Scale: 
1”=30’, Date: May 27, 2026.” 
 
Comments: 
 
EX-1:   
1. There is a monument uphill of the existing farm road, west of the 12” VC.  Please show on plan. 
2. The existing 12” VC pipe appears to be in good condition at the outlet.  There is evidence of 
water flow, but the area downstream of the outlet is stable with no evidence of erosion.   Outlet 
stabilization is not required. 
3. Per A-2 Standards, all property corners shall be noted as found or set. 
C-1: 
4. “Non-structural Control Practices.”   Note that silt fences shall not be used where there is an 
existing/ proposed direct flow of water. 
5. “Structural Control Practices”:   Is  rip-rap outlet protection proposed at all outlets?  See note 2. 
6. “Silt Fence Installation Notes:” Modify notes to reflect comment #1. 
7. “Hay Bale Installation & Maintenance:” Hay Bales are not specified or shown on the drawings. 
8. “Site Prep:” Note 6, include no burying of demolished materials. 
9. Add a project narrative as per page 44, Chapter 3 of Connecticut Guidelines for Soil Erosion and 
Sediment Control.  Add the responsible party. 
 
C-2:  
10. There are no sanitary sewers included in the project  as the property will be served by an on -site 
septic system..  All septic system specifications shall refer to CTDPH Technical Standards. 
11. There are no water mains proposed.  All water service specifications shall refer to Salmon Brook 
Water District Standards. 
12. Add “Stormwater Management System.” Include material specifications for all components of the 
system.  Note that stormwater pipe (HDPE) shall have a smooth interior (CPEP-S). 
 
C-4: 
13. Coordinate with CTDOT regarding the location of the proposed sidewalk along RT 189. 
14. Suggest removing all items noted as being demolished from the sheets showing proposed features 
to reduce confusion. 
 
C-5: 
15. At back entrance to building.  Contour 201 next to the door with FFE=200.5? 
16. Revise the grading in the parking lot so that the maximum surface grade is 5%. 

Page 334

Kevin Clark, PEL 
Town Engineer 
Town of Granby 
15 North Granby Road  
Granby, CT 06035                                                
 CT: (860) 844-5318 
E-MAIL: townengineer@granby-ct.gov 
 
 
Page 2 of 2 
 
17. Revise grading where the entrance drive meets the parking lot. The current grading shows the 
driveway at 7% then a 10% slope turning into the lot, then a parking surface at 5.5%.  This could 
be an awkward transition. 
18. Add some spot grades at the front entrance steps/ramp to the building. 
19. Show location of any septic system access ports and or manholes. 
 
C-6: 
 
20. Add a cleanout in roof collector system where the system tees into the detention/infiltration system. 
21. Show the location and profiles for the soil tests used to size the leaching system. 
 
Stormwater Drainage Report: 
22. Note in report that 8.27 in/hr. is a “Rawls Rate,” and is used for modeling the exfiltration rate from 
the infiltration system.  Include a Rawls Rate table in the report and how the measured infiltration 
rates justify its use. 
23. Add Long Term Stormwater Maintenance Program and the O & M Inspection Checklist table on 
page 197 to one of the site plan sheets.  This is what the contractor, owner, and the Town will refer 
to during and after construction. 
24. Make sure that the site plans are coordinated with the Construction Period Erosion Control Plan. 
25. Table 3.1 shows that the post-development peak discharge rates will be equal to or less than the 
pre-development rates. 
26. The proposed improvements appear to comply with the CTDEEP Stormwater Management 
Standards. 
 
 
 
by: Kevin Clark, PEL, Town Engineer 
 
 
 
 
 
 

Page 335

TOWN OF GRANBY  
15 North Granby Road  
Granby, Connecticut 06035-2102 860-844-5318  
 
  
TO:        Granby Inland Wetlands and Watercourses Commission  
  
FROM:   Kate Bednaz, Inland Wetlands and Watercourses Agent  
  
Date:       June 26, 2026  
  
Subject:  37 Hartford Avenue – Forrest Devine– Site Re-Development – Agent Review  
  
 
Documents have been submitted for review by the Granby Inland Wetlands and Watercourses 
Agency (Granby IWWC) to date by the applicant, Forest Devine and their representative R 
Levesque Associates, Inc. has submitted as part of the application the plan set entitled “Site Plans, 
Residential Development, 37 Hartford Avenue –  Granby, CT 06035, Mr. Forest Devine, 129 
Lovers Lane, Granville, MA 01034, by R Levesque Associates, Inc. Francis Real Estate Holdings, 
dated May 27, 2026”.  The following comments are a result of a field review on June 11, 2026,  
and the review of all application materials submitted to date. Additional review and comments will 
be required upon receipt of revised plans and additional information.  
 
A. Please address all comments issued by the Granby Town Engineer in his June 15, 2026, plan 
review memo.  
B. Please note that a groundwater seep was observed during a 2023 field review at wetland flag 
A20/21, approximately at elevation 169 -170. Conditions were not observable during this 
years site visit.  
C. The watercourse at the base of the slope is a perennial tributary to the Salmon Brook.  
D. Please note that the Natural Diversity Database was consulted regarding th e previous site 
application and found that critical species/habitat were identified for protection. It is strongly 
recommended that a similar consultation with NDDB be conducted for the proposed project. 
E. It is recommended that additional long standing mitigation be considered as part of the site 
development efforts. This may include but not be limited to the following considerations.  
a. Removal of all invasive species on the project site. The plan for removal shall be 
outlined in an invasive species treatment plan located within the project plan set. It 
is recommended that the treatment be conducted in conjunction with any mitigation 
plantings. The Granby IWWC shall be notified in writing when the invasive species 
removal activities are complete. No invasive species shall be present on the 
property at the time of project completion. This shall be a requirement of the bond 
release.  
b. Installation of woody plantings or like, on the top of the slope, adjacent to the rear 
of the parking area . The intent would be to aid in preventing windblown parking 
lot debris from migrating beyond the wood line, as an aid towards long-term diverse 

Page 336

37 Hartford Avenue – Agent Review     Page 2 of 2 
 
native species slope stabilization, enhancement of species diversity and wildlife 
habitat adjacent to the NDDB listed critical species and their associated habitat.  
c. Any mitigation plantings installed shall be required to remain viable through 2 full 
growing seasons, starting at the date of installation.  
d. The selective planting of native trees on the previously disturbed slope within 50 
feet from the wetland boundary. This will provide canopy cover adjacent to the 
wetland to reduce solar exposure, prevent the re-establishment of invasive species, 
and prevent human debris from the parking area from blowing into the wetland at 
the base of the slope. Plantings may be installed in a manner to preserve the existing 
farm road. It does not appear that many additional trees will be required considering 
the increased vegetative density. Canopy plantings are recommended in the “holes” 
where invasive large shrubs persisted or no canopy is currently established. 
e. Consider installing cover ed solar parking along the row of parking area long the 
slope to reduce solar radiation and offset operation costs. Utilizing light -colored 
concrete may also be a consideration.  
f. While pervious pavement is always a consideration, the sub surface infiltration 
units will essentially accomplish a like benefit.  
F. The clay pipe outfall location was observed in the field to be open to allow for stormwater 
flow. However, the end has been broken and has over time receded where there is some minor 
erosion. The applicant investigated the remainder of the pipe, downgradient of their 
connection point and found there to be no obstructions to flow within the existing pipe. If the 
project and town engineer agree that flow volumes and velocities will not change in this 
location, then I recommend the outfall stay in its current condition. The outfall shows no sign 
of active erosion; it appears to have reached a sustainable channel to accommodate the 
current flow.  
G. It is understood that the septic system design is currently under review by the FVHD. Please 
demonstrate to the IWWC that the system will meet the minimum design requirements as it 
relates to the potential for the leaching of nutrients, as it relates to their potential to discharge 
these nutrients to the downgradient resource areas and critical NDDB habitat.  
H. Snow storage. Please detail on the project plans and the O&M Plan for the facility how snow 
will be handled. Can extra storage area be designated? Will snow be hauled off site if the 
storage area overflows? How will salt and sanding be conducted as it rela tes to protecting 
the adjacent resources?  
a. It is recommended that “NO SNOW STORAGE” signs be installed along the entire 
top of slope, along the back of the parking area to prevent snow storage from 
expanding outside of the designated area. In addition, the “SNOW STORAGE 
AREA” should be clearly marked as well. It is recommended that the signs be 
different colors, for example red and green, to provide clear communication.  
I. IWWC application fees may need to be adjusted if the impervious area is modified to include 
more area with the URA or direct impacts to wetlands. If no, or less changes are to occur, the 
filing fee is correct.  
 
 

Page 337

Outlook
37 Hartford Ave, Granby, CT - Drainage Overflow Connection
From Rebecca Li <RebeccaL@rlaland.com>
Date Fri 6/12/2026 9:48 AM
To Abigail Kenyon <akenyon@granby-ct.gov>; Granby Wetlands Agent <wetlandsagent@granby-ct.gov>
Cc Renee Deltenre <RDeltenre@granby-ct.gov>; Nina Fazio <NinaF@rlaland.com>; Forrest Devine
<forrestdevine7@gmail.com>; Rob Levesque <RobL@rlaland.com>
1 attachment (1 MB)
Email from CTDOT on Drainage Connection (06-09-26).pdf;
 
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the
content is safe.
 
Good morning, Abby & Kate,
 
I briefly mentioned at the meeting on Wednesday night that we received correspondence from CTDOT that they
wouldn’t be opposed to us connecting our drainage overflow into the existing drain line that cuts through our property
as long as it doesn’t adversely impact their system. Attached is the email correspondence. Additionally, we also had
the pipelines scoped and I have included the CCTV footage in the onedrive link below:
 
CCTV Inspection on Existing CTDOT Drain Line
 
 
Kind regards,
 
Rebecca Li, P.E.
Project Engineer
RebeccaL@rlaland.com
R Levesque Associates, Inc.
40 School Street
P.O. Box 640
Westfield, MA 01085
 
Direct 413.729.6892
Office 413.568.0985 (x112)
Fax 413.568.0986
 
This email may contain confidential and/or privileged information. If you are not the intended recipient, you are
hereby notified that retention, dissemination, or copying of this communication is prohibited. If you have received this
email in error, please notify the sender by reply email and permanently delete this email and any attachments. Thank
you.

Page 338

1
Rebecca Li
From: Case, Kyle C <Kyle.Case@ct.gov>
Sent: Tuesday, June 9, 2026 7:18 AM
To: Rebecca Li
Cc: Mancini, Joseph; Forrest Devine; Steeves, Aron J; Nemecek, Judith A
Subject: RE: Preliminary Coordination Request – Overflow Connection to Existing CTDOT 
Drainage Infrastructure at 37 Hartford Avenue, Granby, CT
Hi Rebecca, 
 
The CTDOT would consider allowing a connection to our drainage if it is shown that our system would not be 
adversely impacted by the connection.  This would be determined during the encroachment permit application 
stage with supporting documentation.  
 
Please let me know if you need anything else or have any other questions. 
 
Thank you, 
Kyle 
 
KYLE CASE, P.E. 
Transportation Engineer III 
Connecticut Department of Transportation 
District 4 Special Services 
Phone: 203-591-3629 
kyle.case@ct.gov 
 
 
 
 
From: Nemecek, Judith A <Judith.Nemecek@ct.gov>  
Sent: Monday, June 8, 2026 7:13 PM 
To: Rebecca Li <RebeccaL@rlaland.com>; Case, Kyle C <Kyle.Case@ct.gov> 
Cc: Mancini, Joseph <Joseph.Mancini@ct.gov>; Forrest Devine <forrestdevine7@gmail.com>; Steeves, Aron J 
<Aron.Steeves@ct.gov> 
Subject: RE: Preliminary Coordination Request – Overflow Connection to Existing CTDOT Drainage Infrastructure at 37 
Hartford Avenue, Granby, CT 
 
Hi Kyle, would you be able to review this request?   
 
Judith A. Nemecek, P.E.  
District Engineer 
Connecticut Department of Transportation 
District 4 | 359 South Main Street | Thomaston, CT 06787 
203.591.3544 (O) | 203.851.2755 (C)  
judith.nemecek@ct.gov 
 

Page 339

2
 
 
From: Rebecca Li <RebeccaL@rlaland.com>  
Sent: Monday, June 8, 2026 4:18 PM 
To: Nemecek, Judith A <Judith.Nemecek@ct.gov> 
Cc: Mancini, Joseph <Joseph.Mancini@ct.gov>; Forrest Devine <forrestdevine7@gmail.com> 
Subject: Preliminary Coordination Request – Overflow Connection to Existing CTDOT Drainage Infrastructure at 37 
Hartford Avenue, Granby, CT 
 
EXTERNAL EMAIL: This email originated from outside of the organization. Do not click any links or open any attachments 
unless you trust the sender and know the content is safe. 
Hello Judith, 
 
I am one of the project engineers working on a development project at 37 Hartford Avenue in Granby, CT. I am 
reaching out regarding the feasibility of connecting an overflow discharge from our proposed stormwater 
management system to an existing drainage line on the subject property that is within CTDOT jurisdiction. 
 
The existing drainage line provides an outlet for the drainage system within Hartford Avenue to the wetlands 
located on the south side of the project site (see highlighted drain line on the attached plan). We would like to 
request CTDOT's consideration of a connection to this existing line to serve as an emergency overflow from a 
proposed subsurface infiltration basin. 
 
The proposed connection would have a minimal impact on the existing drainage system. No stormwater discharge 
would occur through the overflow structure until the 10-year, 24-hour storm event. The estimated peak overflow 
discharge rates are as follows: 
 10-year, 24-hour storm: 0.7 cfs  
 100-year, 24-hour storm: 2.7 cfs  
We understand that a formal CTDOT permit application cannot be submitted until local approvals have been 
obtained. However, the local permitting authorities have requested that we assess the likelihood of obtaining 
CTDOT approval for the proposed overflow connection as part of their review process. 
 
To further evaluate the feasibility of the connection, we intend to perform a CCTV inspection of the existing 
drainage line to assess its condition. We would also welcome the opportunity to meet with a CTDOT 
representative on site to discuss the proposal and review any concerns. Additionally, the developer is willing to 
consider reasonable improvements or modifications to the existing drainage infrastructure if deemed necessary to 
facilitate the connection and enhance the overall condition of the system. 
 
We appreciate your time and consideration and would welcome any preliminary feedback regarding the feasibility 
of this proposal. 
 
Kind regards, 
 
 
 
 
 
 
 
 
 

Page 340

3
 
 
 
 
 

Page 341

Outlook
FW: SUBMISSION - 37 Hartford Avenue (Devine) - Septic Design Plan
From Abigail Kenyon <akenyon@granby-ct.gov>
Date Fri 6/12/2026 10:06 AM
To Renee Deltenre <RDeltenre@granby-ct.gov>
FYI
 
From: Rebecca Li <RebeccaL@rlaland.com>
Sent: Friday, June 12, 2026 9:51 AM
To: Granby Wetlands Agent <wetlandsagent@granby-ct.gov>; Abigail Kenyon <akenyon@granby-ct.gov>
Cc: Nina Fazio <NinaF@rlaland.com>; Forrest Devine <forrestdevine7@gmail.com>; Rob Levesque <RobL@rlaland.com>; Kevin
Clark <townengineer@granby-ct.gov>
Subject: FW: SUBMISSION - 37 Hartford Avenue (Devine) - Septic Design Plan
 
 
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the
content is safe.
 
Hello,
 
Just wanted to share with you that we submitted the septic application to the Farmington Valley Health District. We
will keep you posted as new developments occur.
 
Kind regards,
 
Rebecca Li, P.E.
Project Engineer
RebeccaL@rlaland.com
R Levesque Associates, Inc.
40 School Street
P.O. Box 640
Westfield, MA 01085
 
Direct 413.729.6892
Office 413.568.0985 (x112)
Fax 413.568.0986
 
This email may contain confidential and/or privileged information. If you are not the intended recipient, you are hereby notified
that retention, dissemination, or copying of this communication is prohibited. If you have received this email in error, please
notify the sender by reply email and permanently delete this email and any attachments. Thank you.
From: Nina Fazio <NinaF@rlaland.com>
Sent: Friday, June 12, 2026 9:47 AM
To: kkula@fvhd.org
Cc: Rob Levesque <RobL@rlaland.com>; Rebecca Li <RebeccaL@rlaland.com>; Jeanne Cook <jeannec@rlaland.com>; Forrest
Devine <forrestdevine7@gmail.com>
Subject: SUBMISSION - 37 Hartford Avenue (Devine) - Septic Design Plan
 
Good morning, Kristin,
 

Page 342

Please accept this electronic submission of a septic design plan and supporting documentation. Jeanne from our
office will be dropping off some hard copies and the filing fee check. Is there a certain time that works best for you?
 
2026-06-12 - Septic 
 
If you have any comments or questions during your review, please do not hesitate to reach out to our office. Thank
you in advance for your time!
 
Enjoy your weekend,
 
Nina Fazio
Permitting Coordinator
R Levesque Associates, Inc.
rlaland.com
40 School Street
P.O. Box 640
Westfield, MA 01085
Direct 413.729.6894
Office 413.568.0985
This email may contain confidential and/or privileged information. If you are not the intended recipient, you are hereby notified
that retention, dissemination, or copying of this communication is prohibited. If you have received this email in error, please
notify the sender by reply email and permanently delete this email and any attachments. Thank you.
 
 

Page 343

Page 1 of 2  
TOWN OF GRANBY 
Incorporated 1786 
15 North Granby Road 
Granby, Connecticut 06035-2102 
860-844-5318 
 
July 2, 2026 
Certified Mailing #9489 0090 0027 6649 9928 18  
 
Mr. Ross Weiner & Ms. Colleen Fontaine 
7 Laurel Drive 
Granby, CT 06035 
Re: Enforcement Order: 7 Laurel Drive, Granby, CT (Mblu: G-51/48/23)  
Conducting a Regulated Activity without a valid IWWC Permit 
 
Dear Mr. Weiner & Ms. Fontaine, 
The Town of Granby noticed during an inspection of the adjacent property that activities had been 
completed without a valid Inland Wetlands and Watercourses Commission (IWWC) permit on your 
property. These activities are in violation of the most recently revised Inland Wetland and Watercourse 
Regulations. The property contains a single-family house and associated features. Thank you for 
accompanying me on a site visit of your property on June 5, 2026 where these activities and future 
intended activities were discussed.   
An Enforcement Order (EO) was issued to the previous owners on May 21, 2025 for direct disturbance of 
the wetland resource areas on the property, as delineated during the EO process. Mitigation measures 
were presented and approved as part of that process. It was understood that the requirement for 
maintaining the mitigation planting survivability during your ownership and the active EO status 
information was conveyed during the sale of the property. 
 
A show cause hearing for this EO will be held at the IWWC July 8, 2026 public meeting in the 
Granby Town Hall meeting room at 7pm, your presence is requested. At that time, you may show 
why there is not cause for the EO, and the IWWC will determine if the EO should be upheld, modified, or 
removed.  
The regulated activities that were conducted on the property without a valid permit/determination consist 
of the following: 
 
1. Wetland area has been filled within the stormwater flow path that consists of stone, shed building, 
and drainage pipe. The shed has been placed in the middle of a stormwater flow path/regulated 
wetland that was purposely preserved as part of the last EO/Permit review process. No erosion 
controls have been installed between the wetland resource area and the work area.   
2. A small catch basin and associated drainpipes have been installed within the wetland area, to drain 
the wetland between the roadway and channel behind the shed.  
 
In accordance with the Town of Granby Inland Wetland and Watercourses Regulations, the work that 
occurred is considered a regulated activity as defined in said regulations and requires a permit application 
be filed and an approval letter to be issued before commencing such activities in accordance with Section 
6 of the regulations. These regulations can be viewed at the Granby Town Hall in the Office of 
Community Development or online at: 
https://www.granby-ct.gov/sites/g/files/vyhlif3171/f/uploads/iwwc.regulationsfinal.07-11-18.pdf. 

Page 344

Page 2 of 2  
The following actions are required to be completed for this EO to be withdrawn. 
 
1. All work within the regulated area or URA on the property shall cease apart from the following: 
a. Install and maintain the erosion control barrier so that no sediment may leave the 
disturbance area. This shall include any discharge from any drainage pipes currently 
installed without a valid permit.  
b. A written mitigation plan for the restoration of the soil conditions shall be 
submitted for review and approval by the IWWC at their August 12, 2026 public 
meeting at 7pm in the Town Hall meeting room. Upon approval of a mitigation plan, 
all unpermitted impacts shall be removed, and the wetland area restored to its original 
condition or improved. This includes the removal of the shed, drainage, and any 
associated features.  
c. Exposed soil shall be stabilized and seeded with a quick germinating seed mixture, 
mulch and other soil stabilizing methods shall be implemented to prevent the migration 
of soil/sediment into the resource areas. Stabilization shall be considered successful 
when 70% of the area is established with 90% permanent vegetative cover. 
d. Ensure the adequate closure of the EO that was inherited from the previous owners. A 
final inspection of the number and survivability of the plantings can be completed at this 
time upon request to release the existing EO from the property.  
 
Please note that in general, any modifications or alterations that require soil disturbance or removal of 
native vegetation from your property will require review by the IWWC prior to the activity being 
completed; as your entire property contains wetland resource areas or their associated upland review 
area, which is 100-feet from a wetland and 200-feet from a watercourse. The record of your property’s 
wetland conditions were clearly established before your purchase of the property.  
 
If you intend to keep the shed and drainage on your property, the IWWC regulations require a permit 
application with the IWWC to be submitted for their review and approval. Mitigation measures for any 
impacts will be required. As discussed during my visit to your property, other soil or vegetation 
disturbance activities were brought up to be completed, please also include these in your application.  
 
As always, please contact the Granby Office of Community Development or me at wetlandsagent@granby-ct.gov 
with any questions or comments.  
 
 
Sincerely, 
 
 
 
Kate Bednaz 
Authorized Wetlands Agent 
Town of Granby, CT 
 
 
 
 
 
 
 
 

Page 345

Page 346

Page 347

Page 348

Page 349

Page 350

Page 351

Page 352

Page 353

Page 354

Page 355

± 22'-0"
APPROXIMATE
EXISTING
CLEAN-OUT
25'-0" MIN.  AREA
BUILDING WITH FOOTING DRAIN10'-0" MIN. AREA
BUILDING WITH
NO FOOTING DRAIN
± 12'-0
26'-0"
11'-6"
EXISTING 2 STORY HOUSE
WITH FULL FOUNDATION
PARTIAL SITE PLAN
SCALE: 1/16"=1'-0"
1
L1.1
EXISTING
GARAGE
UNEXCAVATED
EXISTING 1 STORY
HOUSE ON PIERS
EXISTING
DECK
PROPOSED
1 STORY
HOUSE
ON PIERS
50' FRONT YARD SET BACK
25' SIDE YARD SET BACK
25' SIDE YARD SET BACK20'-0" DRAINAGE
RIGHT OF WAY
10'-0" 10'-0"PROPERTY LINE
EXISTING
1 STORY
SHED
PROPERTY LINE
DAY STREET
138 DAY STREET
SITE PLAN
SCALE: NTS
2
L1.1
ALTERATION & ADDITION TO
ARCHITECTS LLC
41 C NEW LONDON TURNPIKE,  GLASTONBURY, CT 06033
DRAWINGS ARENOT TO BE SCALED
DATE: 6.5.26 RELEASE: FOR PERMIT
CONSTRUCTION DOCUMENTS
PROJECT #26109
DALECKI & MAIER RESIDENCE
138 DAY STREETGRANBY, CONNECTICUT
PROPOSED SITE PLAN
L1.1
PROJECT NORTH
NOTES:   #1 - DIMENSIONS THAT ARE (±) ARE DIMENSIONS THAT REQUIRE FIELD VERIFICATION,ADJUST AS REQUIRED.  DIMENSIONS WITHOUT A (±) ARE TO BE HELD.                #2 - TOP OF EXISTING FIRST FLOOR, SUB FLOOR ASSUMED ELEVATION 0'-0".    #3 - PLAN WAS DERIVED FROM DIGITAL SCANNING TECHNOLOGY. GENERAL  CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS AND REPORT ANY  FINDINGS/DISCREPANCIES TO ARCHITECT PRIOR TO CONSTRUCTION START.

Page 356

UP
W. D.
EXISTING
WATER HEATER
EXISTING BOILER
EXISTING OIL
TANK
EXISTING
WATER PURIFIER
EXISTING
CHIMNEY
UNFINISHED BASEMENT
(ALL AREAS NOT DOCUMENTED)
EXISTING SOIL
LINE CLEAN-OUT
EXISTING
HATCHWAY
(NOT
DOCUMENTED)
EXISTING
ELECTRICAL
PANEL
EXISTING
SUB-ELECTRICAL
PANEL
SINK
PROPOSED FOUNDATION PLAN
SCALE: 1/4"=1'-0"
1
A1.0
± 22'-0"
APPROXIMATE
EXISTING
CLEAN-OUT
3
A3.1
25'-0" MIN.  AREA
BUILDING WITH FOOTING DRAIN
10'-0" MIN. AREA
BUILIDNG WITH NO FOOTING DRAIN
EXISTING AREA WITH NEWER
FOUNDATION DRAIN & TRAP
ROCK BELOW GRADE.
± 12'-0"
EXISTING
STRUCTURE
ABOVE
EXISTING CONDENSER
UNIT TO BE RELOCATED
PER CODE AND
COORDINATE WITH
OWNER
EXTEND DRYER VENT TO
NEW EXTERIOR WALL
ABOVE
WITH
2X4 FLOOR JOISTS
@ 16" O.C.
W/ R-15 BATT INSULATION
(FOR ADDITIONAL INSULATION)
2X10 FLOOR JOISTS
@ 16" O.C.
W/ R-30 BATT INSULATION MIN.
(MAIN STRUCTURE)
11'-914" 12'-0"
11'-6"
234"
2'-0"
P.T. 6X6 POST WITH SIMPSON
STRONG-TIE CONNECTORS;
BC6 POST CAP WITH
(12) 0.162 X 3-1/2 FASTENERS TO
EACH BEAM AND POST FLANGES
ABU66Z ADJUSTABLE POST BASE WITH
58" DIA. ANCHOR AND (12) 0.162 X 3-1/2 FASTENERS TO POST FLANGE
DASHED LINE OF EXTENT OF
NEW STRUCTURE ABOVE
(3) 1 34" X 9 14" LVL BEAM (3) 1 34" X 9 14" LVL BEAM
10" DIA. CONCRETE PIER ON
3'-0"X3'-0"X1'-6" CONCRETE FOOTING
WITH (4) #5 REBAR EACH WAY OR
BIGFOOT MODEL BF28 AT 8560 LBS -
TYP. (3)
± 15'-1014"
CL CL
CL
26'-0"
234"
CL
SIT NEW JOISTS ON
EXISTING BALCONY JOISTS -
MODIFY AS REQUIRED
EXISTING APPLIANCES TO
REMAIN
(2) P.T. 6X6 HORIZ. POSTS
BELOW GRADE AND (2) ABOVE
GRADE (NOT SHOWN) AROUND
PERIMETER - SEE 3/A3.1
BUILT-UP 4X4
POSTS  EACH
SIDE UNDER
POSTS ABOVE  -
TYP OF (2)
4
A3.1
EXTEND EXISTING DRYER VENT -
PAINTED (SEE ELEVATION)
EXTEND EXISTING SPIGOT
(SEE ELEVATION)
ALTERATION & ADDITION TO
ARCHITECTS LLC
41 C NEW LONDON TURNPIKE,  GLASTONBURY, CT 06033
DRAWINGS ARENOT TO BE SCALED
DATE: 6.5.26 RELEASE: FOR PERMIT
CONSTRUCTION DOCUMENTS
PROJECT #26109
DALECKI & MAIER RESIDENCE
138 DAY STREETGRANBY, CONNECTICUT
PROPOSED FOUNDATION PLAN
A1.0
PROJECT NORTH
NOTES:   #1 - DIMENSIONS THAT ARE (±) ARE DIMENSIONS THAT REQUIRE FIELD VERIFICATION,ADJUST AS REQUIRED.  DIMENSIONS WITHOUT A (±) ARE TO BE HELD.                #2 - TOP OF EXISTING FIRST FLOOR, SUB FLOOR ASSUMED ELEVATION 0'-0".    #3 - PLAN WAS DERIVED FROM DIGITAL SCANNING TECHNOLOGY. GENERAL  CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS AND REPORT ANY  FINDINGS/DISCREPANCIES TO ARCHITECT PRIOR TO CONSTRUCTION START.

Page 357

DN
UP
GARAGE
(NOT DOCUMENTED)
ART STUDIO
LVP
VAULTED CEILING
FAMILY ROOM
CARPET TO LVP
VAULTED CEILING
DINING ROOM
CARPET TO LVP
HALL
WOOD
W.I.C.
WOOD BATH
(RENO.)
PRIME BEDROOM
CARPET
FOYER
WOOD
OFFICE
WOOD
COVERED PORCH
(NOT DOCUMENTED)
W.C.2'-6" VANITY
S & R
DBL.
OVENS
W.
D.
5'-0"X 1'-3" DEEP CAB.
DWFARMHOUSE SINK W/
BACKSPLASH
46" IN-LINE REFRIG
36" COOKTOP
W/ MAX. 400 CFM
VENTED HOOD
GARAGE
TRASH
COUNTER
MICRO
SHELVES
SHELVES
36"X36"
FOLDING
TABLE
BY OWNER
36" X 80" C.O.
26'-0"
11'-6"
KITCHEN
NEW LVP
VAULTED CEILING
P. RM.
NEW TILE
LAUNDRY
NEW LVP
NEW (2) 1 34" X 9 14" LVL FLUSH BEAM W/
BUILT-UP 4X4 POSTS
EACH SIDE
30" C.O.
PROPOSED FIRST FLOOR PLAN
SCALE: 1/4"=1'-0"
1
A1.1
FLAT CEILING
SHELVES
10'-0" X 1'-2" BOOK SHELVES
REPLACENEW
2'-6" VANITY
HANGING ROD
DEEP SOAKING
SINK IN
29" WIDE CAB.
MAKE-UP
DESK
BY OWNER
2X6 WALL
2X6 WALL
3
A3.1
VACUUM CAB.
W/ TOE-KICK
ATTACHED TO DOORS
(4) 6X6 FAUX BEAMS
DECK
(NOT DOCUMENTED)
A1.1
A
4'-11" 13'-034" 8'-014"
CL CL
EXISTING
EXISTING EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTINGEXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING EXISTING EXISTING EXISTING
EXISTING
EXISTING CASED
OPG.
EXISTING
EXISTING CASED
OPG.
512"
512"
512"
OPEN ON
BOTH SIDES
1'-0" 4'-0" 1'-0"
3'-0"1'-0"
COORDINATE WITH
OWNER LOCATIONS OF
DOUBLE HIGH HANGING
B A
ADJUST WINDOW
HEIGHT UPON FINAL
SINK W/ BACKSPLASH
SELECTION
ALIGN FINISH WALLS
PATCH ALL WALLS AND CEILINGS
TO MATCH AND ALIGN WITH
EXISTING
MODIFY EXISTING DOOR
FOR NEW C.O. TRIM
2'-6"
2'-4"
2'-4"
2'-6"
ALIGN FINISH WALLS
ART DISPLAY WALL
EQUAL EQUAL
INFILL WINDOW
INFILL WINDOW
INFILL WINDOW
S & R S & R
S & R
PROVIDE WASHER
DRIP PAN
INFILL PARTIAL
WINDOW EACH SIDE
MODIFY BASEBOARD
HEAT AS REQUIRED
2'-6" X 1"-6"
CABINET
2'-6" X 1"-6"
CABINET
2'-6" X 1"-6"
CABINET
3'-0" X 1"-6"
CABINET
5'-1"2'-412"312" 512"
312"5'-1"312"
NEW (3) 2X10 HEADER
BUILT-UP 6X6
POSTS
EACH SIDE
NEW (2) 2X8 HEADER
BUILT-UP 6X6
POSTS
EACH SIDE
INTERIOR DOORS - 6
PANEL PAINTED TO
MATCH EXISTING &
HARDWARE - TYP.
(4) FAUX BEAM LOCATIONS;
NORTH & SOUTH - FLUSH TO WALL
MID NORTH - ALIGN WITH EXISTING
BATH/HALL WALL
MID SOUTH - MIRROR ON CL ON
WINDOW
EXISTING EXISTING EXISTING EXISTING
TILE
4
A3.1
3'-0" 1'-812" 2'-6"
ANGLED CEILING
CUT BEAMS
(DUE TO SECTION)
OPTIONAL
FLOATING
SHELVES
INTERIOR KITCHEN ELEVATION 'A'
SCALE: 1/4"=1'-0"
2
A1.1
7'-914"
1X VERT. TRIM
BETWEEN FAUX
BEAMS
TILE BACKSPLASH
QUARTZ
COUNTERTOP
PAINTED CABINETS
ADJUST WINDOW
HEIGHT UPON FINAL
SINK W/ BACKSPLASH
SELECTION
PROPOSED FIRST FLOOR DEMOLITION PLAN
SCALE: 1/4"=1'-0"
0
A1.1
KITCHEN
REMOVE ENGINEERED WOOD
BATH
TILE
FAMILY ROOM
CARPET
VAULTED CEILING
DINING ROOM
CARPET
HALL
WOOD
W.I.C.
WOOD
FOYER
WOOD
OFFICE
WOOD
BALCONY
COVERED PORCH
(NOT DOCUMENTED)
REMOVE BAY
WINDOW
MODIFY BASEBOARD
RADIATOR
REMOVE
WINDOW
EXISTING
EXHAUST FAN
TO REMAIN -
EXTEND VENT
TO NEW
EXTERIOR WALL
REMOVE W.C.
REMOVE
PEDESTAL SINK
NO WORKNO WORK
NO WORK
NO WORK
CARPETENG. WOOD
REMOVE
BALCONY
RAILING
REMOVE
WINDOW
REMOVE DOOR
REMOVE CABINETS,
COUNTER, APPLIANCES,
PLUMBING FIXTURES,
FLOORING AND GWB
CEILING. COORDINATE
WITH OWNER TO
SALVAGE ANY ITEMS
PRIOR TO DEMO START
REMOVE WALLS &
CABINETS
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTINGDN
EXISTING CASED
OPG.
PROVIDE ALTERNATE ESTIMATE
REMOVE EXISTING FAMILY ROOM
& DINING ROOM CARPET AND
REPLACE WITH LVP
REMOVE PARTIAL
EXTERIOR WALL -
PROVIDE SHORING
AS REQUIRED UNTIL
NEW BEAM IS
INSTALLED
REMOVE
WINDOW
EXISTING EXISTING
EXISTING
= NEW WOOD WALLS
= EXISTING WOOD WALLS
= WALLS TO BE REMOVED
WALL SCHEDULE
WINDOW SCHEDULE
ROUGH OPENING
6'-0 3/8" X 3'-0 1/2" A
UNITWINDOW
NOTES:
· WINDOWS - ANDERSEN 400 SERIES, WHITE EXTERIOR, INTERIOR & HARDWARE.  FULL INSECT
SCREENS ON ALL OPERABLE UNITS.
· ALL NEW EXTERIOR WALLS ARE 2X6 WITH 12" CONTINUOUS PLYWOOD SHEATHING AND 1" CONTINUOUS R-INSULATION. PROVIDE/ORDER EXTENSION JAMBS AS REQUIRED - COORDINATE
WITH CONTRACTOR.
MODEL REMARKSDESCRIPTION
2'-8 1/8" X 4'-4 7/8" 
C33
TW2642B DOUBLE-HUNG
3-WIDE CASEMENT
3/4" SDL GRILLES 6/6 
NO GRILLS; TRADITIONAL FOLDING HANDLE; SHEETROCK RETURNS - NO EXTENSION JAMBS
ALTERATION & ADDITION TO
ARCHITECTS LLC
41 C NEW LONDON TURNPIKE,  GLASTONBURY, CT 06033
DRAWINGS ARENOT TO BE SCALED
DATE: 6.5.26 RELEASE: FOR PERMIT
CONSTRUCTION DOCUMENTS
PROJECT #26109
DALECKI & MAIER RESIDENCE
138 DAY STREETGRANBY, CONNECTICUT
PROPOSED FIRST FLOOR PLAN
A1.1
PROJECT NORTH
NOTES:   #1 - DIMENSIONS THAT ARE (±) ARE DIMENSIONS THAT REQUIRE FIELD VERIFICATION,ADJUST AS REQUIRED.  DIMENSIONS WITHOUT A (±) ARE TO BE HELD.                #2 - TOP OF EXISTING FIRST FLOOR, SUB FLOOR ASSUMED ELEVATION 0'-0".    #3 - PLAN WAS DERIVED FROM DIGITAL SCANNING TECHNOLOGY. GENERAL  CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS AND REPORT ANY  FINDINGS/DISCREPANCIES TO ARCHITECT PRIOR TO CONSTRUCTION START.

Page 358

Page 359

Page 360

Page 361

Page 362

Page 363

Page 364

Page 365

Page 366

TOWN OF GRANBY 
Incorporated 1786 
15 North Granby Road 
Granby, Connecticut 06035-2102 
 
1 
May 28, 2026 
Certified Mailing# 9489 0090 0027 6650 0481 77 
 
 
Charles Duffy McGee III  
Duffy McGee 
PO Box 87 
West Granby, CT 06090 
 
Re: Notice of Violation: 65, 79, &87 Barkhamsted Road, Granby, CT (Mblu: G-20/66/3,4,&6)  
Conducting a Regulated Activity without a valid IWWC Permit 
 
Dear Mr. McGee: 
 
During a site inspection of an abutting property, it was noted that a portion of your properties appear to 
contain similar wetland resource areas as mapped and observed on the abutting property. As you may 
know, your properties are unique as they abut a productive watercourse, an unnamed tributary to the 
West Branch of the Salmon Brook, a Federally designated Wild and Scenic River. I have attached the 
town wetlands mapping as it relates to your properties and the link to information on the Lower 
Farmington River and Salmon Brook Wild and Scenic  https://lowerfarmingtonriver.org/ and the National 
Parks link for the stretch of waterway https://home.nps.gov/articles/000/lower-farmington-salmon-brook-
wild-and-scenic-rivers.htm (article is enclosed). On the Wild and Scenic River pages you can find maps 
which show the extent of designated rivers, and information surrounding activities associated with the 
rivers.  
 
Upstream of your property, the watercourse traverses over 3 miles of untouched marshes, gorges, and 
forests before it reaches your property. Geographically, your property is the first human 
development/activities (beside transportation crossings) to positively or negatively influence the integrity 
of the watercourse, before it reaches the West Branch of the Salmon Brook. We are looking forward to 
discussing this wetland resource area and your experiences living next to it in more detail.  
 
The Inland Wetlands and Watercourses Commission (IWWC) is charged with protecting the Town of 
Granby Wetlands and Watercourses as detailed by the Granby Inland Wetlands and Watercourses 
Regulations and applicable state laws. The Regulations require all work within a wetland resource area or 
the associated Upland Review Area (URA) obtain an approval from the IWWC.  
 
Review of Google Earth imagery appears to show some development activities on 87 Barkhamsted Road 
in November of 1991, which currently contains a single-family residence. The remaining property along 
this stretch of the watercourse appears to be undeveloped at that time. In May of 2004, aerial 
photographs indicate that activities may be occurring on all 3 properties. In November of 2010, aerial 
photographs indicate that all properties were being utilized, clearing and possibly grading had occurred, 
and that materials are being stored within mapped wetland areas. Current site observations and imaging 
indicate that the area is utilized for storage, and any clearing activities have ceased.  
 
The distinct nature of the activities and detailed location of wetlands resource areas (watercourse and 
wetland) has only been seen from the roadway, the adjacent property, and aerial photography. Material 
(wood working materials, cars, structures, equipment, etc.) are being stored within the wetland resource 
areas or their associated URA (100-feet from a wetland and 200-feet from a watercourse). At this time, all 
available data indicates that materials are stored or activities are being conducted within a regulated area 
without valid IWWC approval.  
 
  

Page 367

2 
In accordance with the Town of Granby Inland Wetland and Watercourses Regulations (IWWR), the work 
that occurred is considered a regulated activity as defined in said regulations and requires a permit 
application to be filed and an approval letter to be issued before commencing such activities in 
accordance with Section 6 of the regulations. These regulations can be viewed at the Granby Town Hall 
in the Office of Community Development or online at: 
 
https://www.granby-ct.gov/sites/g/files/vyhlif3171/f/uploads/iwwc.regulationsfinal.07-11-18.pdf. 
 
To fully understand the site conditions as they relate to the IWWR, it would be kindly appreciated if you 
would reach out to the Granby Office of Community Development to schedule a site visit to review 
activities within the mapped wetland resource areas on your properties. The site visit will allow the Town 
to better understand any errors in the Town wetlands mapping, if any “after-the fact” approvals are 
required, and answer any questions and provide information regarding wetland resource area protection 
and regulatory requirements.  
 
The Town understands that these activities have been in place for a period of time and would like to work 
with you to obtain IWWC approval for any activities you would like to continue within these areas. The 
goal is to protect wetland resource areas by preserving the natural landscape with balanced human use 
when adjacent to such a critical environmental resource. At this time, the Town reserves the right to 
initiate formal enforcement activities to achieve compliance or as necessary, document mitigation 
activities to be completed. 
 
As always, please contact the Granby Office of Community Development at (860) 844-5318 with any 
questions or comments and to set up a time to visit your properties.  
 
Sincerely, 
 
 
 
Kate Bednaz 
Authorized Wetlands Agent  
Town of Granby, CT 

Page 368

From: Renee Deltenre
To: Abigail Kenyon
Subject: Fw: El Nino Weather forecase
Date: Tuesday, June 16, 2026 10:39:53 AM
From: Maureen Eberly <jeberly885@aol.com>
Sent: Tuesday, June 16, 2026 10:05 AM
To: Renee Deltenre <RDeltenre@granby-ct.gov>
Subject: Re: El Nino Weather forecase
 
 
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you
recognize the sender and know the content is safe.
 
So I can update my list can you please send Sue and Barbara's new email?
My original list came from Jen and once new members came on she hasn't
had time to send me the new addresses.
Thanks
Maureen
On Tuesday, June 16, 2026 at 08:30:20 AM EDT, Renee Deltenre <rdeltenre@granby-ct.gov> wrote:
Received and distributed to Sue and Barbara.
From: Maureen Eberly <jeberly885@aol.com>
Sent: Tuesday, June 16, 2026 6:08 AM
To: John Laudati <jlaudati@mlkbr.com>; David Tolli <dantolli@yahoo.com>; Nick
Dethlefsen <ndethlefsen@gmail.com>; Victoria Dirienzo <v.dirienzo@cox.net>;
fbjones1231@gmail.com <fbjones1231@gmail.com>; sueathorsesandhounds@gmail.com
<sueathorsesandhounds@gmail.com>; Kate Bednaz <freshwaterwetland@gmail.com>
Cc: Renee Deltenre <RDeltenre@granby-ct.gov>
Subject: El Nino Weather forecase
 
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you
recognize the sender and know the content is safe.
 
Hello everyone,
Below is an article describing the El Nino weather effects for the
upcoming season. 
Renee- 
I do not have an email address for the new IWWC member.  

Page 369

if you could please share with her, as I do not have an updated email
address.
Thank you
Maureen Eberly
El Niño Is Back. Here's How It Could Reshape Weather Patterns In
Connecticut
A rapidly strengthening El Niño could influence winter temperatures,
snowfall and hurricane activity.
Posted Thu, Jun 11, 2026 at 2:08 pm ET
A fast-strengthening El Niño could significantly reshape weather patterns
in Connecticut and across the Northeast later this year and into the winter
months.
The heightened risks vary widely by region, from heavy rain and flooding
in parts of the Southwest and Southeast to drought and wildfire concerns
in the Northwest, Northern Plains and Upper Midwest, according to a
news release from AccuWeather, a private weather company.
The update comes as federal forecasters declared El Niño conditions
present in the tropical Pacific Ocean on Thursday after months of
monitoring warming ocean temperatures.
AccuWeather meteorologists said the current El Niño is unusual because
it developed early and is expected to strengthen rapidly through the
remainder of 2026.
“El Niño is not a storm. It doesn’t affect you directly overnight. But the
stronger the signal, the more it can dominate other weather patterns and
amplify extremes,” AccuWeather meteorologist Paul Pastelok said. “This
El Niño is developing unusually fast. Most El Niños begin in the fall.”
El Niño is a natural climate pattern that occurs when sea surface
temperatures in parts of the equatorial Pacific Ocean warm significantly
above historical averages. That warming can trigger changes in global
atmospheric patterns, shifting storm tracks and influencing rainfall,

Page 370

drought, wildfire risk and hurricane activity.
What Could El Niño Mean For Connecticut?
For residents in Connecticut and across the Northeast, El Niño could
influence everything from winter temperatures and snowfall to the
frequency of coastal storms.
Historically, El Niño winters tend to favor warmer-than-average conditions
across the Northeast while increasing the chances of a more active
southern jet stream. That pattern can sometimes lead to wetter conditions
and stronger nor'easters along the East Coast.
Warmer overall temperatures can also complicate snowfall outcomes in
Connecticut. While major snowstorms can still occur during strong El Niño
years, overall snowfall totals often depend on storm tracks and the
availability of cold air.
Some of the strongest El Niño events on record have coincided with
unusual winter weather across the Northeast. The powerful 1997-98 El
Niño was associated with one of the warmest and wettest winters on
record in parts of the country, while the 2015-16 "Godzilla" El Niño
produced generally warmer-than-average conditions but still delivered a
historic blizzard to parts of the East Coast.
Meteorologists caution that no two El Niño events are exactly alike, and it
remains too early to predict specific winter outcomes for Connecticut.
Is ‘Super El Niño’ Still Possible?
AccuWeather indicates a potential “Super El Niño” if equatorial Pacific
temperatures reach 3.6 degrees Fahrenheit (2.0 degrees Celsius) above
average.
Pastelok estimates a 40 percent chance for this rare event, noting that
current conditions must persist through late 2026 to reach that threshold.
Only seven such events have occurred since 1957, according to the
Climate Prediction Center’s Relative Oceanic Niño Index. The last one
was in 2015-16.

Page 371

Hurricane Season Adjustments
El Niño typically increases wind shear in the Atlantic basin. Wind shear,
which is the change in wind speed and direction with height, can disrupt
tropical storms and hurricanes before they organize or intensify.
AccuWeather’s 2026 Atlantic hurricane season forecast projects 11 to 16
named storms. DaSilva said the early arrival of El Niño is causing
forecasters to lean closer to 11 named storms than 16.
“With El Niño’s arrival early in the hurricane season, we are now leaning
closer to 11 named storms rather than 16 in the Atlantic this year,”
DaSilva said.
Stronger El Niño patterns have often contributed to increased wind shear
across parts of the Atlantic, which can disrupt developing tropical systems
and sometimes suppress hurricane activity.
Even so, AccuWeather warned that a quieter Atlantic season does not
eliminate the danger, especially from storms that form close to the U.S.
coastline. Those “homegrown” systems can leave residents with less time
to prepare.
People along the coast and well inland should continue to monitor
forecasts for tropical rainstorms, tropical storms and hurricanes.
Outlook For The Rest Of U.S.
Here’s what could be in store for the rest of the country.
West Coast and California: California and parts of the Southwest could
see increased moisture from eastern Pacific tropical storms and
hurricanes, raising the risk of heavy rainfall, runoff, debris flows and flash
flooding.
AccuWeather said El Niño often has its greatest impact from late fall into
early spring. During that period, heavier rain and mountain snow events
can occur in California.
Residents in wildfire burn-scar areas may face a higher risk of debris
flows if heavy rain develops over vulnerable terrain.

Page 372

Southwest: The Southwest could see more moisture drawn northward
from a busier eastern Pacific hurricane season. That could increase the
risk of heavy rainfall and flash flooding in parts of the region, especially if
tropical moisture interacts with storm systems.
AccuWeather said this year’s eastern Pacific hurricane season is already
running ahead of schedule. The basin’s third tropical storm, Cristina,
formed almost a month earlier than the July 6 historical average for the
season’s third named storm.
“Warm water is one of the key ingredients in creating tropical storms,”
AccuWeather hurricane expert Alex DaSilva said. “The rapid pace of early
tropical storm development in the Eastern Pacific can be attributed to the
near-record water temperatures observed in the Eastern Pacific. This is a
very typical pattern in an El Niño set up.”
DaSilva said a marine heat wave is underway from Baja South along the
Central American coastline, where sea surface temperatures are 3 to 5
degrees Fahrenheit above historical averages in some areas.
AccuWeather is forecasting 17 to 22 named storms in the eastern Pacific
this year.
Northwest: The Northwest could face a drier and warmer summer,
AccuWeather said. That pattern could worsen drought in some areas and
increase wildfire risk.
The region may also miss out on consistent or intense precipitation during
the wet season, which could contribute to longer-term drought concerns
even after El Niño peaks.
Northern Plains and Upper Midwest: The Northern Plains and Upper
Midwest could also see a warmer, drier summer, which may prolong
drought conditions in some areas.
AccuWeather said drought concerns could linger for years in parts of the
Plains after El Niño conditions peak, especially from Texas northward into
the Dakotas.

Page 373

“Following the end of El Niño, the next two to three years could end up
being significantly drier, leading to drought conditions, especially in parts
of the plains from west Texas to the Dakotas,” Pastelok said. “El Niño
patterns tend to be persistent, meaning places that end up drier than
average can stay that way for an extended period of time, possibly for
months or even years.”
Central Plains: The Plains could see lingering drought impacts even after
the strongest El Niño conditions subside.
AccuWeather warned that pockets of severe to extreme drought could
extend well into 2027 and potentially beyond in parts of the Plains from
Texas to North Dakota.
That could affect agriculture, water supplies, wildfire risk and regional heat
patterns.
Texas and the Southern Plains: The southern U.S. can initially see wetter
conditions during El Niño, but AccuWeather said those conditions can
reverse after the peak of a strong event.
Parts of Texas and the southern Plains could face long-term drought
implications in the years after El Niño, particularly if the pattern turns
significantly drier.
Gulf Coast: The Gulf Coast could see a wetter pattern from late fall into
early spring, which may help ease ongoing drought in some areas.
However, heavier rainfall can also increase the risk of flooding, especially
in poor-drainage areas or places that receive repeated rounds of rain.
Southeast: The Southeast could also see wetter conditions, particularly
from late fall into early spring.
AccuWeather said the pattern may help ease drought in the region, but it
could also bring an elevated risk of excessive rainfall and severe weather.
Florida may face a heightened severe weather risk during the mid-to-late
winter season, which is typically the state’s drier time of year.

Page 374

A stronger southern storm track could increase the likelihood of severe
weather in Florida and nearby areas.

Minutes: archived copy, SHA-256 e24d089949ab…. Agenda: archived copy, SHA-256 5051b4251ecd…. Packet: kept offline, SHA-256 1648d7c15b66….