Towns / Granby / Inland Wetlands & Watercourses Commission / Mar 11, 2026
Inland Wetlands & Watercourses Commission, Mar 11, 2026
Granby Inland Wetlands & Watercourses Commission Hide agendas that already have minutesDocuments
| Type | Document | Pages | Open |
|---|---|---|---|
| minutesminutes | IWWC Minutes | 4 | PDF download · town site |
| agenda | IWWC Agenda | 1 | PDF download · town site |
| packetpacket | IWWC Meeting Packet Not attached: this packet is 29 MB, too large to host here. Use the town site link. |
49 | town site |
Summary of the minutes
AI-generated summary. Each line links to the PDF page it came from; check it before relying on it.
Read the official minutes (PDF, 4 pages) The PDF is the record; this summary is a guide to it.
The Commission approved the February 11, 2026 minutes as amended, delegated two Lakeside Drive and Fielding Woods permit requests to the IWWC Agent, and scheduled a public hearing for the 83 Barkhamsted Road application on April 8, 2026. It also held a public hearing on the Simsbury Road Bridge replacement, approved an as-of-right determination for the Granby Tennis Club planting, and continued the Case Street enforcement item to the April 8 meeting.
Decisions (8) · all reported votes
- Minutes of February 11, 2026
Approved as amended
Vote: Motion by D. Tolli, second by F. Jones, voted 5-0-0 · p. 1 - 54 Lakeside Drive – M. Courtney – permit request for 16'x32' addition within a regulated area
Delegated to the IWWC Agent for review and approval
Vote: Motion by S. Okie, second by V. Dirienzo, voted 5-0-0 · p. 2 - 7 Fielding Woods – S. Bizon – permit request for 24'x16' prefabricated accessory structure within a regulated area
Delegated to the IWWC Agent for review and approval
Vote: Motion by S. Okie, second by V. Dirienzo, voted 5-0-0 · p. 2 - 83 Barkhamsted Road – A. Licenji – permit request to demolish cabin and construct 24'x34' single-family home on piers within a regulated area
Application received and public hearing scheduled for the next regular meeting on April 8, 2026, at 7:00 p.m. due to significant impact
Vote: Motion by S. Okie, second by V. Dirienzo, voted 5-0-0 · p. 3 - 1 Broad Hill Road – Granby Tennis Club – request for review to plant along slope area within a regulated area
Approved as an As of Right Determination per Inland Wetlands and Watercourses Commission Regulations, Section 4.2b, subject to conditions: erosion and sedimentation measures installed prior to planting; only native species installed
Vote: Motion by S. Okie, second by V. Dirienzo, voted 5-0-0 · p. 3 - 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – regulated activity without valid IWWC permit (Enforcement Order documentation deadline)
Continued to the next regular meeting (April 8th); J. Laudati abstained and stated he will recuse himself from this matter moving forward
Vote: Motion by V. Dirienzo, second by F. Jones, voted 4-0-1 · p. 3, p. 4 - Amend agenda to add Item #8: Public Session
Agenda amended
Vote: Motion by F. Jones, second by S. Okie, voted 5-0-0 · p. 4 - Adjournment
Meeting adjourned at 9:10 p.m.
Vote: Motion by V. Dirienzo, second by F. Jones, voted 5-0-0 · p. 4
Also discussed (1)
- Public Hearing: Simsbury Road Bridge replacement over West Branch of Salmon Brook – Town of Granby: Public hearing held on permit request; public comment received; hearing closed at 8:02 p.m. Agent review comments requested additional information on invasive species management and possible expansion of temporary construction easement boundaries. No decision recorded. · p. 1, p. 2
Summary of the agenda: IWWC Agenda
AI-generated summary.
This is the agenda for the Granby Inland Wetlands and Watercourses Commission regular meeting on March 11, 2026. It lists public hearings, permit requests, a request for review, and an agent report, none of which have outcomes recorded yet.
On the agenda (8)
- Action on the minutes of February 11, 2026 · p. 1
- Public Hearing: Simsbury Road Bridge – Town of Granby – Permit request for proposed Simsbury Road Bridge replacement over the West Branch of Salmon Brook within a regulated area (received and continued from 2/11/26) · p. 1
- Permit Request: 54 Lakeside Drive – M. Courtney – construct a 16'x32' addition within a regulated area · p. 1
- Permit Request: 7 Fielding Woods – S. Bizon – install a 24'x16' prefabricated accessory structure on crushed stone within a regulated area · p. 1
- Permit Request: 83 Barkhamsted Road – A. Licenji – demolish existing cabin and construct a new 24'x36' single-family home on piers within a regulated area · p. 1
- Request for Review: 1 Broad Hill Road – Granby Tennis Club – RFR to plant along slope area within a regulated area · p. 1
- Agent Report: Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – conducting a regulated activity without a valid IWWC Permit; Dam Safety submission extended to 3/6/2026 · p. 1
- Passage 1: Materials received after the 10 AM deadline will not be accepted for display: Procedural rule on materials for display at videoconferenced meetings; no decision, vote, or appropriation recorded · p. 1
Full text of the documents
View the minutes PDF on this page (IWWC Minutes)
Text of the minutes (IWWC Minutes, 4 pages)
Page 1 · open in PDF
1 MEETING MINUTES Town of Granby Inland Wetlands and Watercourses Commission Wednesday, March 11, 2026, at 7:00 pm PRESENT: David Tolli, Susan Okie, John Laudati, Fred Jones, and Vickie Dirienzo ALSO PRESENT: IWWC Agent Kate Bednaz and Land Use Coordinator Renee Deltenre 1. Call to Order Chair Laudati called the meeting to order at 7:01 p.m. 2. Action on the minutes of February 11, 2026 ON A MOTION by D. Tolli seconded by F. Jones, the Commission voted 5-0-0 to approve the February 11, 2026, minutes as amended. 3. Public Hearings a. Simsbury Road Bridge – Town of Granby – Permit request for the proposed Simsbury Road Bridge replacement over the West Branch of Salmon Brook within a regulated area. Engineer John Wengell of CHA Solutions was present on behalf of the town to discuss the application. The Town of Granby is seeking to replace the existing two-span, 111-foot bridge, which was built in 1956. The current bridge has a curb-to-curb width of 22 feet, carries bi-directional traffic in a northerly/southerly direction, and the width of the existing bank is 56 feet. J. Wengell ran through existing conditions and the proposed replacement. The new structure will be comprised of 48.5-inch-deep steel beams with a concrete deck, two, 10-foot travel lanes, and two, 5-foot shoulders. Curb-to-curb width will be 30 feet and overall length will be 105 feet with a 43-degree skew. J. Wengell noted that the existing center abutment will be removed, riprap will be placed along the substructure and toe boulders will be placed at the embankments. A plan overview was presented for the proposed traffic detour, water handling and site restoration, including total temporary and permanent wetland and watercourse impacts. The anticipated start date is spring of 2027, and selected trees must be cut prior to April 14th due to ecological concerns. Approximately 10 trees will be removed, and 11 trees will be planted prior to project completion. Excavated soils will be hauled off-site to a stockpile location for testing, and the location has not been determined at this time. K. Bednaz ran through her review comments and requested additional information pertaining to invasive species management and possible expansion of the temporary construction easement boundaries. Public Comment Maureen Eberly of 37 Silkey Road questioned who would be in charge of monitoring the removal of invasive species and stated that a two-year maintenance period is not enough. Rick Orluk of 106 Higley Road and President of the Granby Land Trust expressed concerns regarding the proposed width and reconfiguration of the bridge, and how it may impact pedestrian safety.
Page 2 · open in PDF
2 Katherine Dunnington of 142 Simsbury Road had questions regarding the project timeline, which trees would be removed, and what management practices would be utilized to control invasives. Reinhard Maier of 138 Day Street expressed concerns regarding the detour route as it relates to the intersection of Barn Door Hills Road and Route 20. Due to line-of-sight issues, it was recommended that the CT Department of Transportation be involved with the project. Mike from Stonewall Drive had questions regarding the staging of equipment, penalties if project completion is delayed, herbicides used for invasives management, soil testing, notification to emergency services, and more. Philip Marshall of 45 Bushy Hill Road and member of the Salmon Brook Historical Society expressed interest in working with the Commission on invasive species management. The public hearing was closed at 8:02 p.m. 4. Permit Requests a. 54 Lakeside Drive – M. Courtney – Permit request to construct a 16’x32’ addition within a regulated area. Applicant and property owner Michael Courtney was present to discuss the application. He and his wife recently purchased both 54 Lakeside Drive, which has one single-family house on it and 56 Lakeside Drive, which is a vacant lot. The two properties have since been merged into one, known as 54 Lakeside Drive and consists of 0.36 acres in total within the R30 Zone. The applicant is seeking to construct a two-story, 512 square foot addition on the southern side of the existing home, inclusive of a full dormer to the rear of the house. Due to the location of the septic system, well, topography and waterbody located to the rear of the home, the proposed location of the addition is the most ideal. K. Bednaz provided feedback based on her review of the application, as well as a drive by inspection. She indicated that additional erosion and sedimentation control measures shall be installed, expressed concerns regarding the grade of the proposed driveway, and asked if the applicant would consider a planting plan. As the proposed activities are within the upland review area, it was recommended that the application be delegated to the agent for review and approval. ON A MOTION by S. Okie seconded by V. Dirienzo, the Commission voted 5-0-0 to delegate the application to the IWWC Agent for review and approval. b. 7 Fielding Woods – S. Bizon – Permit request to install a 24’x16’ prefabricated accessory structure on crushed stone within a regulated area. Applicant and property owner Steven Bizon was present to discuss the application and answer any questions the Commission had. He is seeking permission to place a 384 square foot, prefabricated shed on crushed stone in a grass area adjacent to the driveway with underground electrical. The structure will be used for personal use as a pottery studio and golf simulator. As the proposed activities are within the upland review area, it was recommended that the application be delegated to the agent for review and approval. ON A MOTION by S. Okie seconded by V. Dirienzo, the Commission voted 5-0-0 to delegate the application to the IWWC Agent for review and approval.
Page 3 · open in PDF
3 c. 83 Barkhamsted Road – A. Licenji – Permit request to demolish an existing cabin and construct a new 24’x34’ single-family home on piers within a regulated area. Applicant and property owner Albano Licenji was present to discuss the application, along with Professional Engineer Joseph Green of Robert Green Associates, LLC. The property owner is seeking to demolish the existing 656 square foot cabin to construct a new 816 square foot, year-round single-family home. The house will consist of two bedrooms and the site will be accessed via the existing gravel driveway. The home requires the installation of a new septic system and well and will be constructed on a pier foundation due to its close proximity to the brook and the presence of alluvial soils. K. Bednaz provided feedback based on her review of the application, as well as prior site visits. She recommended that additional erosion and sedimentation control measures be installed between the house and stream bank, and that bank stabilization efforts shall be made to enhance the bank where it bends toward the house. The submittal of a mitigation plan was requested, and town staff will conduct a site visit prior to the next meeting. The Commission discussed whether to hold a public hearing on the application. ON A MOTION by S. Okie seconded by V. Dirienzo, the Commission voted 5-0-0 to receive the application and schedule a public hearing for the next regular meeting on April 8, 2026, at 7:00 p.m. due to significant impact. 5. Request for Review a. 1 Broad Hill Road – Granby Tennis Club – RFR to plant along slope area within a regulated area. Christine Giannoni and Laura Fetridge of the Granby Tennis Club were present via Zoom to discuss the application. The club is seeking permission to install numerous plantings along a sloped area that once housed hemlock trees and has been layered with mulch for the past few years. In order to establish a more permanent solution to the erosion, the club has been working with a horticulturalist to develop a planting plan. K. Bednaz requested that only native plantings be used and stated that erosion and sedimentation measures shall be installed. Under the regulations, this project may be considered an as-of-right activity, and the Commission was asked to vote on this determination. ON A MOTION by S. Okie seconded by V. Dirienzo, the Commission voted 5-0-0 to approve the application as an As of Right Determination per the Inland Wetlands and Watercourses Commission Regulations, Section 4.2b; subject to the following conditions: 1. Erosion and sedimentation measures shall be installed prior to planting; and 2. Only native species shall be installed. 6. Agent Report and Correspondence a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated Activity without a valid IWWC Permit. Dam Safety submission extended to 3/6/2026. K. Bednaz indicated that the property owner has filed for an extension with DEEP and recommended that the deadline to submit documentation to the Commission per the Enforcement Order be extended to the April 8th regular meeting. J. Laudati stated for the record that he will recuse himself from this matter moving forward.
Page 4 · open in PDF
4 ON A MOTION by V. Dirienzo seconded by F. Jones, the Commission voted 4-0-1 to continue this agenda item to the next regular meeting. J. Laudati abstained. 7. Commissioner Reports and Correspondence None ON A MOTION by F. Jones seconded by S. Okie, the Commission voted 5-0-0 to amend the agenda to add Item#8: Public Session. 8. Public Session Maureen Eberly of 37 Silkey Road spoke on behalf of the Farmington River Watershed Association (FRWA) and provided insight regarding grant funding and supporting local projects, such as the one presented by the Granby Tennis Club. 9. Adjourn ON A MOTION by V. Dirienzo seconded by F. Jones, the Commission voted 5-0-0 to adjourn the meeting at 9:10 p.m. Respectfully submitted, Renee Deltenre Land Use Coordinator
View the agenda PDF on this page (IWWC Agenda)
Text of the agenda (IWWC Agenda, 1 page)
Page 1 · open in PDF
Please note: Any person who wishes to provide materials for display on the video monitors at an IWWC meeting where such monitors are being used to videoconference the meetings must email the materials no later than 10 AM on the day of the meeting. All materials must be contained in a single attachment to the email. Materials received after the 10 AM deadline will not be accepted for display. Display of the materials is subject to all other rules and procedures of the IWWC. Zip drive, memory sticks and other data storage devices will not be accepted. Town of Granby Inland Wetlands and Watercourses Commission Regular Meeting Agenda Wednesday, March 11, 2026, at 7:00 pm Town Hall Meeting Room Zoom: https://us02web.zoom.us/j/83876066033?pwd=tjtGNbSazO6dVgDb9HXA4wCie3bvJc.1 Call In: 929-205-6099 Meeting ID: 838 7606 6033 Passcode: 920270 1. Call to Order 2. Action on the minutes of February 11, 2026 3. Public Hearings a. Simsbury Road Bridge – Town of Granby – Permit request for the proposed Simsbury Road Bridge replacement over the West Branch of Salmon Brook within a regulated area. (Received and continued from 2/11/26) 4. Permit Requests a. 54 Lakeside Drive – M. Courtney – Permit request to construct a 16’x32’ addition within a regulated area. b. 7 Fielding Woods – S. Bizon – Permit request to install a 24’x16’ prefabricated accessory structure on crushed stone within a regulated area. c. 83 Barkhamsted Road – A. Licenji – Permit request to demolish an existing cabin and construct a new 24’x36’ single-family home on piers within a regulated area. 5. Request for Review a. 1 Broad Hill Road – Granby Tennis Club – RFR to plant along slope area within a regulated area. 6. Agent Report and Correspondence a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated Activity without a valid IWWC Permit. Dam Safety submission extended to 3/6/2026. 7. Commissioner Reports and Correspondence 8. Adjourn
Text of the packet (IWWC Meeting Packet, 49 pages)
Page 1
Please note: Any person who wishes to provide materials for display on the video monitors at an IWWC meeting where such monitors are being used to videoconference the meetings must email the materials no later than 10 AM on the day of the meeting. All materials must be contained in a single attachment to the email. Materials received after the 10 AM deadline will not be accepted for display. Display of the materials is subject to all other rules and procedures of the IWWC. Zip drive, memory sticks and other data storage devices will not be accepted. Town of Granby Inland Wetlands and Watercourses Commission Regular Meeting Agenda Wednesday, March 11, 2026, at 7:00 pm Town Hall Meeting Room Zoom: https://us02web.zoom.us/j/83876066033?pwd=tjtGNbSazO6dVgDb9HXA4wCie3bvJc.1 Call In: 929-205-6099 Meeting ID: 838 7606 6033 Passcode: 920270 1. Call to Order 2. Action on the minutes of February 11, 2026 3. Public Hearings a. Simsbury Road Bridge – Town of Granby – Permit request for the proposed Simsbury Road Bridge replacement over the West Branch of Salmon Brook within a regulated area. (Received and continued from 2/11/26) 4. Permit Requests a. 54 Lakeside Drive – M. Courtney – Permit request to construct a 16’x32’ addition within a regulated area. b. 7 Fielding Woods – S. Bizon – Permit request to install a 24’x16’ prefabricated accessory structure on crushed stone within a regulated area. c. 83 Barkhamsted Road – A. Licenji – Permit request to demolish an existing cabin and construct a new 24’x36’ single-family home on piers within a regulated area. 5. Request for Review a. 1 Broad Hill Road – Granby Tennis Club – RFR to plant along slope area within a regulated area. 6. Agent Report and Correspondence a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated Activity without a valid IWWC Permit. Dam Safety submission extended to 3/6/2026. 7. Commissioner Reports and Correspondence 8. Adjourn
Page 2
Page 3
1 MEETING MINUTES Town of Granby Inland Wetlands and Watercourses Commission Wednesday, February 11, 2026, at 7:00 pm PRESENT: Nick Dethlefsen, David Tolli, Susan Okie, John Laudati, Fred Jones, and Vickie Dirienzo ALSO PRESENT: IWWC Agent Kate Bednaz and Land Use Coordinator Renee Deltenre (Zoom) 1. Call to Order Chair Laudati called the meeting to order at 7:01 p.m. 2. Action on the minutes of January 14, 2026 ON A MOTION by F. Jones seconded by S. Okie, the Commission voted 6-0-0 to approve the January 14, 2026, minutes as presented. 3. Permit Requests a. Simsbury Road Bridge – Town of Granby – Permit request for the proposed Simsbury Road Bridge replacement over the West Branch of Salmon Brook within a regulated area. Engineer John Wengell of CHA Solutions was present on behalf of the town to discuss the application. The Town of Granby is seeking to replace the existing two-span, 111- foot bridge, which was built in 1956. The current bridge has a curb-to-curb width of 22 feet, carries bi-directional traffic in a northerly/southerly direction, and the width of the existing bank is 56 feet. J. Wengell ran through existing conditions and the proposed replacement. The new structure will be comprised of 48.5-inch-deep steel beams with a concrete deck, two, 10-foot travel lanes, and two, 5-foot shoulders. Curb-to-curb width will be 30 feet and overall length will be 105 feet with a 43-degree skew. J. Wengell noted that the existing center abutment will be removed, riprap will be placed along the substructure and toe boulders will be placed at the embankments. A plan overview was presented for the proposed traffic detour, water handling and site restoration, including total temporary and permanent wetland and watercourse impacts. The anticipated start date is spring of 2027, and selected trees must be cut prior to April 14th due to ecological concerns. K. Bednaz provided some feedback on the application, and requested additional information on the dewatering staging area and discharge, wetland resource areas, the mean high-water line and how that elevation relates to the shelf being created, etc. The Commission discussed whether to hold a public hearing on the application. ON A MOTION by V. Dirienzo seconded by F. Jones, the Commission voted 6-0-0 to receive the application and schedule a public hearing for the next regular meeting on March 11, 2026, at 7:00 p.m. due to public interest and significant impact.
Page 4
2 4. Agent Report and Correspondence a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated Activity without a valid IWWC Permit. Dam Safety submission extended to 3/6/2026. Attorney Timothy Furey was present on behalf of the property owner to provide updates. He stated that many of the items necessary to correct the violation and satisfy requirements of DEEP and the Town are on hold due to the weather. In addition to Soil Scientist David Lord, the property owner has retained Kratzert Jones & Associates, Inc. to complete mapping pertaining to the pond and impoundment, and Karl Acimovic, P.E. & L.S. to assist with the requirements outlined by DEEP. Attorney Furey will continue to work with Attorney Brooks and requested to continue this agenda item to the next meeting so that updates can be presented to the Commission. Other than maintaining erosion and sediment control measures, no work is occurring onsite. Attorney Furey stated for the record that the Law Firm of Murphy, Laudati, Kiel & Rattigan, LLC, represented the sale of this property and the potential for a conflict of interest for J. Laudati should be evaluated. ON A MOTION by D. Tolli seconded by F. Jones, the Commission voted 6-0-0 to continue this agenda item to the next regular meeting. 5. Commissioner Reports and Correspondence J. Laudati indicated that he recently installed a temporary structure on his property to provide shelter for his animals, as they are unable to use the existing run-shed shed due to weather conditions. K. Bednaz indicated that the approved RFR for the run-shed shed can be amended to reflect the addition of the temporary structure. 6. Adjourn ON A MOTION by V. Dirienzo seconded by N. Dethlefsen, the Commission voted 6-0-0 to adjourn the meeting at 7:45 p.m. Respectfully submitted, Renee Deltenre Land Use Coordinator
Page 5
Page 6
TOWN OF GRANBY MEMORANDUM TO: Inland Wetlands and Watercourses Commission FROM: Abby Kenyon, Director of Community Development DATE: March 5, 2026 RE: Overview and Status of IWWC Applications ______________________________________________________________________________ The following provides an overview and status of applications and other items pending before the IWWC. Public Hearings Simsbury Road Bridge – Town of Granby – Permit request for the proposed Simsbury Road Bridge replacement over the West Branch of Salmon Brook within a regulated area. (Received and continued from 2/11/26) At the Commission’s February 11th meeting, the Commission reviewed the plans for the replacement of the Simsbury Road bridge and voted to hold a public hearing at the March 11th meeting. Please note that the Wetlands Agent has reviewed the plan set and her review memo is included in the meeting packet. While there are several conditions of approval outlined in the memo, you will also see that the Wetlands Agent is recommending a decision be made in April. This will allow time to review the area once the snow melts before a decision is made. This will be discussed further at the meeting. Permit Requests 54 Lakeside Drive – M. Courtney – Permit request to construct a 16’x32’ addition within a regulated area. The applicant is seeking approval to construct an addition to the south side of the home. This area is within the upland review area as it is located within 200 feet of Manitook Lake. Please refer to the plan set. As the disturbed area is within the upland review area, the Commission is asked to consider delegating this application to the Wetlands Agent for further review and approval. 7 Fielding Woods – S. Bizon – Permit request to install a 24’x16’ prefabricated accessory structure on crushed stone within a regulated area. The applicant is seeking approval to install a prefabricated shed on their property. The shed will be located on crushed stone adjacent to the driveway—please see the attached plan set. This area
Page 7
is within the upland review area. The Commission is asked to consider delegating this application to the Wetlands Agent for further review and approval. 83 Barkhamsted Road – A. Licenji – Permit request to demolish an existing cabin and construct a new 24’x36’ single-family home on piers within a regulated area. There is an existing house at 83 Barkhamsted Road, which is located in close proximity to a brook. The applicant is applying to demolish the existing house and construct a new house. As shown on the plan set, this new house would be located slightly farther away from brook. A new septic system, well, and other associated site improvements are also proposed. This work is within alluvial soils and is therefore regulated by the IWWC. This application will be received at the Commission’s March 11th meeting and a presentation made. The Commission may act on this application at the April meeting. It should be noted that if the Commission approves the application, approval through the Zoning Board of Appeals will also be needed due to the rear yard setback. Request for Review 1 Broad Hill Road—Granby Tennis Club—RFR to plant along slope area within a regulated area. The Granby Tennis Club has submitted an application to install native plantings along a sloped area on the property. Please refer to the plans for more information. Under the regulations, this may be considered an as-of-right activity. If the Commission is in agreement, the Commission is asked to vote on this determination.
Page 8
Page 9
Preview - Content may appear in color online but may be printed in black and white.
This Insertion Order Form forms part of the Agreement by and between Customer and Tribune Publishing Company ("Company"), and is governed
by the terms and conditions set forth in Company's Business Terms of Service (available at https://www.tribpub.com/central-terms-of-service/ ) (the
"Business Terms") and the Data Processing Addendum (the "DPA") The Business Terms, DPA, and this Insertion Order are collectively referred to
as the "Agreement." The Business Terms and DPA constitute integral parts of this Insertion Order and are hereby incorporated into this Insertion
Order by this reference. Capitalized Terms not otherwise defined in this Insertion Order have the same meanings as that ascribed to them in
Business Terms. In the event of any ambiguity, conflict, or inconsistency between any of the Business Terms, this Insertion Order, and the DPA, the
following order of precedence shall govern for purposes of resolving any such ambiguity, conflict, or inconsistency: (1) this Insertion Order, (2) the
DPA, if applicable, and (3) the Business Terms.
Page 2 of 2Page 10
TOWN OF GRANBY Incorporated 1786 15 North Granby Road Granby, Connecticut 06035-2102 1 March 3, 2026 Re: Inland Wetlands Agent Review, Prepared by Kate Bednaz Bridge # 04525 Simsbury Road over the West Branch of the Salmon Brook – IWWC Permit Application Bridge Replacement The following are comments following my review of the application materials submitted to date and site conditions observed on February 10, 2026. It shall be noted that there is frozen ground conditions and significant snow cover that limit the on-site review of the existing site conditions. Therefore, a detailed review of the wetland resource area boundaries cannot be completed at this time. These conditions make it difficult to accurately see elevations, ground cover, soil conditions, bank conditions, etc. The photographs and data plots included in the project reports help to understand site conditions, however, it is not a substitute for an on-site unobstructed site inspection. 1. Therefore, it is recommended that the IWWC hold their final decision until the ground cover and soil conditions can be reasonably observed and a more detail site inspection can be completed by staff and Commissioners. 2. It is recommended that an effort/plan is prepared to remove invasive species and establish a native species population within the project limits. If possible, this area shall include the alluvial wetland on the northwest side of the structure. a. Please clarify the extent of mitigation plantings zones on the permitting plans. b. If extensive invasive species are to be removed in a specific location, it is recommended that native plantings be installed to prevent the re-establishment of invasive species. c. It is recommended that the initial treatment/removal of invasive species is proposed during the site clearing activities and 2-years full growing seasons post construction. The following condition is recommended to be included in the conditions of approval. The site shall remain free of invasive vegetative species throughout 2-full growing seasons to ensure re-establishment from invasive seed stock or plant parts does not occur. A final inspection shall be required by the IWWC or their designee upon completion of the monitoring period. At this time, no invasive species shall remain in the treatment area. 3. Wetland W1-1-15 is described as a watercourse in the report documents but is not labeled as a watercourse on the project plans. Please label the watercourse and modify the 200-foot URA accordingly. 4. It is recommended that the water handling notes detail that no water may be directly discharged to a wetland resource area, except for the 100-year floodplain. All floodplain elevations shall be maintained. This project when completed, in my professional opinion, will be an ecological and hydraulic improvement to the West Branch of the Salmon Brook and the surrounding resource areas. The increased structure span, removal of the existing center pier, and the re-establishment of existing resource area feature will overall be a benefit. The following are recommended conditions of approval for consideration by the IWWC. Additional conditions regarding invasive species removal and success and planting survival rate will likely be additional conditions to be added once a response to comments is supplied.
Page 11
2 1. The Office of Community Development shall be notified: a. At least 48 hours prior to the start of any activities and when barrier erosion controls have been installed prior to earth disturbance activities. b. Upon completion of any invasive species management efforts. c. Upon completion of construction and site stabilization, the IWWC shall be notified in writing that work is complete, and a final inspection may be completed at that time. 2. The applicant shall reimburse the Town of Granby for all payments made to the Town Wetlands Officer for monitoring the development for compliance with this approval. The applicant will reimburse the Town at a rate of $100 per hour for the services of the Town Wetlands Officer or other designated expert. The applicant shall deposit with the Town of Granby the sum of $5,000 to be applied for the costs as described herein. Should the costs exceed this amount, the applicant will be billed for the difference. Any funds not used for the project will be remitted to the applicant at the conclusion of the project. As used in this context, the term “Town Wetlands Officer” includes any person or firm so designated by the Director of Community Development for the purposes of monitoring the development activities to assure compliance with this approval and the IWWC Regulations. 3. All work shall be in conformance with the approval and application materials as submitted for this Permit Approval. Any modifications to the approved plans must be reviewed and approved by the Granby Inland Wetlands and Watercourses Commission or their designated Agent. 4. Prior to the start of work, a copy of the Stormwater Pollution Prevention Plan (SWPPP), or similar plan as may be required by the CT General Permit for Discharge of Stormwater and Dewatering Wastewaters from Construction Activities, shall be submitted to the Office of Community Development. 5. Erosion controls shall be maintained until the site has achieved permanent stabilization. Permanent stabilization is defined as 70% permanent vegetation covering over 90% of the area. A stockpile of erosion controls shall remain on site to prepare controls as necessary. The IWWC shall be notified in writing at least 48 hours in advance of erosion controls being removed. 6. Excavated soil shall not be brought off property without the notification and approval of the Office of Community Development. The applicant shall supply the destination in writing for any excavated soil removed from the property. 7. Only clean fill, free of invasive species, shall be brought on-site. Utilizing on-site fill will reduce, if not eliminate the potential for the introduction and potential colonization of new invasive species into this area of the watershed. 8. Excavated soil shall not be brought off property without the notification and approval of the Office of Community Development. The applicant shall supply the destination in writing for any excavated soil removed from the property. 9. The site shall remain free of invasive vegetative species throughout 2-full growing seasons to ensure re-establishment from invasive seed stock or plant parts does not occur. A final inspection shall be required by the IWWC or their designee upon completion of the monitoring period. At this time, no invasive species shall remain in the treatment area. 10. The site development contractor shall supply the Town of Granby Office of Community Development, via hard copy or electronic, copies of their weekly site inspection reports. 11. This permit is valid for a period of 5 years from the date of issuance.
Page 12
Page 13
Page 14
Page 15
Page 16
Book: 474 Page: 1151 Page: 1 of 1
Page 17
Page 18
Page 19
Page 20
Page 21
Page 22
Page 23
Page 24
MYRIADVISION DESIGNER: MYRIADVISION LLC 327 HIGH ST. BRISTOL RI. 02809 THIS DRAWING IS THE PROPERTY OF MYRIADVISION LLC. AND IS NOT TO BE REPRODUCES OR USED FOR ANY PURPOSE OTHER THAN ORIGINALLY INTENDED UNLESS AUTHORIZED BY MYRIADVISION LLC. DO NOT SCALE THIS DRAWING, USE FIGURED DIMENSIONS ONLY. THE CONTRACTOR SHALL FIELD VERIFY ALL MEASUREMENTS AND NOTIFY MYRIADVISION LLC. PRIOR TO COMMENCING ANY WORK. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, ORDINANCES, AND REGULATIONS OF ANY PUBLIC AUTHORITIES BEARING ON THE PERFORMANCE OF THE WORK. THE CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO MYRIADVISION LLC. FOR ADJUSTMENTS PRIOR TO PERFORMING SUCH WORK. DATE: 01-21-2026COURTNEY RESIDENCE 54 Lakeside Dr. Granby, CT 06035 EL 2.0 PROPOSED FRONT/RIGHT FACING EXTERIOR ELEVATIONS SCALE: 3 16" = 1'-0" T.O. ROOF 21'-6 1 2" T.O. SEC. FLOOR 18'-3" SECOND FLOOR 10'-3" T.O. GROUND FLOOR 9'-4" GROUND FLOOR 1'-6 1 2" T.O. BSMT. 0'-11 1 2" BSMT. -6'-0" GRADE 0'-0" FRONT FACING EXTERIOR ELEVATION1.0 RIGHT FACING EXTERIOR ELEVATION1.1 3 12 12 9
Page 25
MYRIADVISION DESIGNER: MYRIADVISION LLC 327 HIGH ST. BRISTOL RI. 02809 THIS DRAWING IS THE PROPERTY OF MYRIADVISION LLC. AND IS NOT TO BE REPRODUCES OR USED FOR ANY PURPOSE OTHER THAN ORIGINALLY INTENDED UNLESS AUTHORIZED BY MYRIADVISION LLC. DO NOT SCALE THIS DRAWING, USE FIGURED DIMENSIONS ONLY. THE CONTRACTOR SHALL FIELD VERIFY ALL MEASUREMENTS AND NOTIFY MYRIADVISION LLC. PRIOR TO COMMENCING ANY WORK. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, ORDINANCES, AND REGULATIONS OF ANY PUBLIC AUTHORITIES BEARING ON THE PERFORMANCE OF THE WORK. THE CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO MYRIADVISION LLC. FOR ADJUSTMENTS PRIOR TO PERFORMING SUCH WORK. DATE: 01-21-2026COURTNEY RESIDENCE 54 Lakeside Dr. Granby, CT 06035 EL 2.1 PROPOSED REAR/LEFT FACING EXTERIOR ELEVATIONS SCALE: 3 16" = 1'-0" T.O. ROOF 21'-6 1 2" T.O. SEC. FLOOR 18'-3" SECOND FLOOR 10'-3" T.O. GROUND FLOOR 9'-4" GROUND FLOOR 1'-6 1 2" T.O. BSMT. 0'-11 1 2" GRADE 0'-0" BSMT. -6'-0" REAR FACING EXTERIOR ELEVATION1.2 LEFT FACING EXTERIOR ELEVATION1.3
Page 26
Page 27
Page 28
Page 29
Page 30
Page 31
Page 32
Page 33
Page 34
Page 35
Page 36
Page 37
Page 38
Page 39
Page 40
Page 41
Page 42
neers
n Associates L.L.C.
Surveyors and Engineers
(860) 589-0135
TERRYVILLE, CONNECTICUT 06786
6 OLD WATERBURY ROAD
TO MY KNOWLEDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY
CORRECT AS NOTED HEREON.
TO MY KNOWLEDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY
REG. NO. 0026292
JOSEPH M. GREEN P.E.
H 0°00'00"
V 90°00'00"
H 0°00'00"
V 90°00'00"
Robert Gree
Robert Green Associates L.L.C.
Surveyors and Engi
SURVEYOR'S NOTES:
20 200
SCALE IN FEET
TOPOGRAPHIC ACCURACY CLASS - T-2
HORIZONTAL ACCURACY CLASS - A-2
BOUNDARY DETERMINATION CATEGORY - RESURVEY
SURVEYORS, INC. ON AUGUST 29, 2019.
OF CONNECTICUT" AS ADOPTED BY THE CONNECTICUT ASSOCIATION OF LAND
20-300b-20 AND THE "STANDARDS FOR SURVEYS AND MAPS IN THE STATE
REGULATIONS OF CONNECTICUT STATE AGENCIES SECTION 20-300b-1 THROUGH
THIS SURVEY AND MAP HAVE BEEN PREPARED IN ACCORDANCE WITH THE
CORRECT AS NOTED HEREON.
SCALE: 1"=20' MARCH 2, 2026
GRANBY, CONNECTICUT
83 BARKHAMSTED ROAD
JETMIRA LICENJI
ALBANO LICENJI &
PREPARED FOR
ASSESSORS LOT 5
SITE PLAN FOR HOUSE
ZONING LOCATION SURVEY
ENVIRONMENTAL SERVICES.
THE FIELD BY STANSFIELD
WATER MARK LIMIT IDENTIFIED IN
ALLUVIAL DEPOSITS LIMIT AND HIGH
PRIOR TO CONSTRUCTION.
CALL-BEFORE-YOU-DIG AT 811
THE CONTRACTOR MUST CONTACT
ASSESSORS LOT 5
ASSESSORS BLOCK 66
ASSESSORS MAP G-20
R2A RURAL RESIDENTIAL
NOTES:
AREAS ARE FULLY STABILIZED.
CONTROL MEASURES AFTER UP GRADIENT
15. REMOVE ALL EROSION AND SEDIMENTATION
DISTURBED AREAS.
14. GRADE, STABILIZE, SEED AND MULCH ALL
13. INSTALL ALL UTILITIES.
12. CONSTRUCT HOUSE.
11. BACKFILL FOUNDATION WALLS.
IF REQUIRED.
HOUSE AND POUR CONCRETE. ADD REBAR
10. ERECT FOUNDATION WALL FORMS FOR
POUR CONCRETE. ADD REBAR IF REQUIRED.
9. ERECT FOOTING FORMS FOR HOUSE AND
8. EXCAVATE FOR HOUSE.
7. ROUGH GRADE HOUSE AREA.
FROM THE HOUSE CONSTRUCTION AREA.
BOULDERS LARGER THAN ONE CUBIC FOOT
6. REMOVE UNACCEPTABLE SOIL AND
5. CONSTRUCT DRIVEWAY TO HOUSE.
MULCH OR COVER WITH NETTING.
FILLED. STOCKPILE TOPSOIL. SEED AND
4. STRIP TOPSOIL IN AREAS TO BE CUT OR
AREAS TO BE CLEARED.
3. REMOVE TREES, BRUSH AND STUMPS IN
TO REMAIN UNDISTURBED.
CLEARLY MARK THE EDGE OF VEGETATION
2. DEVELOPER'S SURVEYOR TO STAKE AND
STABILIZED.
UNTIL THE DISTURBED AREAS ARE FULLY
CONTROL MEASURES AND MAINTAIN THEM
1. INSTALL ALL EROSION AND SEDIMENTATION
ANTICIPATED FINISH DATE-FALL 2026
ANTICIPATED START DATE-SPRING 2026
HOUSE CONSTRUCTION SCHEDULE:
AT 1-860-990-4248.
LICENJI ALBANO AND HE CAN BE CONTACTED
EMERGENCY SITUATION DURING CONSTRUCTION IS
THE PERSON RESPONSIBLE FOR HANDLING ANY
HE CAN BE CONTACTED AT 1-860-990-4248.
DURING CONSTRUCTION IS LICENJI ALBANO AND
EROSION AND SEDIMENTATION CONTROL MEASURES
THE PERSON RESPONSIBLE FOR MAINTENANCE OF
CONTACT AND PERMIT INFORMATION:
LEGEND
000
HIGH WATER MARK LIMIT
HIGH WATER MARK IDENTIFICATION MARKER
ALLUVIAL DEPOSITS LIMIT
ALLUVIAL DEPOSITS IDENTIFICATION MARKER
WATER CONNECTION
UTILITY POLE
CENTERLINE OF INTERMITTENT WATERCOURSE
EDGE OF WATERCOURSE
BUILDING RESTRICTION LINE
PERCOLATION HOLE TEST
DEEP HOLE TEST
PROPOSED MINOR CONTOUR
PROPOSED INDEX CONTOUR
EXISTING MINOR CONTOUR
EXISTING INDEX CONTOUR000
WC
WC
34.0'
34.0'
2
4
.0
'
2
4
.0
'
ELEVATION=599.0
FINISH FLOOR
HOUSE
A
A
600
3
3
.0
'
42.3'
133.0'
33.78'
S76°50'38"W 9.75'
S86°53'09"W
47.02'
N84°06'29"W
33.77'N77°08'06"W
59.85'N70°34'41"W
65.82'N74°49'56"W
2
5.93
'
N
2
3
°43
'16"E
2
1.8
7'
S
0
2
°5
3
'2
4
"E
15
0
.6
8
'
S
0
3
°5
2
'4
8
"E
194.15'
N
2
3
°43
'16"E
35.00'
S80°58'54"E
126.00' S58°54'37"E
25'
25'
S.Y.
S.Y.
R
.Y.
F
.Y.50'
5
0
'
DH C
DH B
PH 1
PH 2
75'
PROTECTIVE CIRCLE
N/F CHARLES DUFFY McGEE III
N/F BROAD HILL HOMEOWNERS' ASSOCIATION, INC.
N/F DUFFY McGEE
SHEET 1 OF 3
BOTTOM OF TRENCH=601.35
FL=602.35
37.5' OF 12" HIGH BY 62" WIDE GST 6212
(5' ON ALL SIDES.)
SELECT FILL PAD AREA
DATUM-NAVD 1988
ELEVATION=600.97
CONTROL POINT 104-NAIL
BENCH MARK
CHIMNEY TO GRADE.
PROVIDE A CLEANOUT
FL=595.50 (OUT)
FL=595.50 (IN)
500 GALLON CONCRETE PUMP CHAMBER
79'-2" DIAMETER PVC PRESSURE PIPE ASTM D 2241, SDR 21 OR EQUAL
FL=602.35
DISTRIBUTION BOX
5'-4" DIAMETER PVC ASTM D 3034, SDR 35 OR EQUAL
FL=602.85
BAFFLE DISTRIBUTION BOX (HIGH POINT)
SETTLING PIT
FL=592.00
15" END SECTION
FL=595.50
15" END SECTION
Existing Shed
Existing Bituminous Concrete Driveway
Existing Gravel Driveway
Existing 15" Diameter RCP
2'-4" DIAMETER PVC ASTM D 3034, SDR 35 OR EQUAL
CHIMNEY TO GRADE.
PROVIDE A CLEANOUT
FL=596.00 (OUT)
FL=596.25 (IN)
1000 GALLON CONCRETE SEPTIC TANK
11-4" DIAMETER PVC ASTM F 1760, SCHEDULE 40 OR EQUAL
72'-1" DIAMETER COPPER
TOPSOIL STOCKPILE
GRAVEL DRIVEWAY
45'-15" DIAMETER RCP AT S=7.8%
Existing Gravel Driveway
WELL
CONSTRUCTION ENTRANCE
(CT ROUTE 219)
BARKHAMSTED ROAD
REMOVED.
THE EXISTING HOUSE MUST BE Existing House
ENDERS BROOK
PUMPED, CRUSHED AND FILLED.
THE EXISTING LEACHING AREA MUST BE
PUMPED, CRUSHED AND FILLED.
THE EXISTING SEPTIC TANK MUST BE
REMOVED.
THE EXISTING SHED MUST BE
MATHEMATICAL CLOSURE ONLY. TIE LINE FOR
CENTERLINE OF ENDERS BROOK. PROPERTY LINE IS THE
PORCH
F
L=5
9
6
.5
0
HM 101
HM 102
HM 103
HM 104
HM 105
HM 106
AD 205
AD 204
AD 203
AD 202
AD 201
AD #
HM #
NERIANI LAND SURVEYING, LLC.
PROVIDED BY
PROPERTY AND TOPOGRAPHIC INFORMATION
CL&P 903
Eversource 903
CL&P 902
Eversource 902
CL&P 901
CL&P 917
234.77'
N79°24'40"W
DH A
AD
AD
AD
AD
HM
HM
HM
HM
HM
AD
HM
590
5
90
590
590
600
600
610
610
620
62
0
630
63
0
640
640
650
650Page 43
DESIGN DATA
MLSS DETERMINATION
MLSS PROVIDED = 37.5
MLSS = HF x FF x PF = 18.0 x 1.0 x 1.0 = 18.0
PF = 1.0
FF = 1.0
HF = 18.0
RESTRICTIVE LAYER = 32"
HYDRAULIC GRADIENT = > 15.0%
CELLAR FLOOR = N/A
GARAGE FLOOR = N/A
FINISH FLOOR = 599.0
LEACHING PROVIDED = 375.0 SF
LEACHING REQUIRED = 375.0 SF
SEPTIC TANK = 1000 GALLON
NUMBER OF BEDROOMS = 2
ROOTS TO 32"
DEEP HOLE A
MOTTLING AT 32"
WATER AT 46"
NO LEDGE
14-32"
32-70"
0-14"
(3-26-24)
DEEP HOLE DATA
ROOTS TO 33"
DEEP HOLE B
MOTTLING AT 33"
WATER AT 36"
LEDGE AT 56"
15-33"
33-56"
0-15"
SANDY LOAM
ORANGE/BROWN FINE
GRAVEL
BROWN SAND AND
LITTER
TOPSOIL AND FOREST
SANDY LOAM
ORANGE/BROWN FINE
GRAVEL
BROWN SAND AND
LITTER
TOPSOIL AND FOREST
DEEP HOLE C
LEACHING TRENCH
PERCOLATION RATE-
0-10.0 MINUTES/INCH 0-10.0 MINUTES/INCH
3"
PERCOLATION HOLE 2
8¼"
11"
DEPTH=16"
DRY
2½"
PERCOLATION HOLE 1
7¾"
9½"
DEPTH=16"
(3-26-24)
PERCOLATION HOLE DATA
DRY
PERCOLATION RATE-
11:17
11:27
11:37
11:47
11:15
11:25
11:35
11:45
WORK DESCRIPTION
MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL CHECKLIST
DATE INSPECTED INITIALS
TOPSOIL, SEED AND MULCH ON DISTURBED AREAS
TOPSOIL STOCKPILE
CONSTRUCTION ENTRANCE
SEDIMENTATION CONTROL FENCE
SCALES: AS NOTED MARCH 2, 2026
GRANBY, CONNECTICUT
83 BARKHAMSTED ROAD
JETMIRA LICENJI
ALBANO LICENJI &
PREPARED FOR
ASSESSORS LOT 5
SITE PLAN FOR HOUSE
FOR
MISCELLANEOUS NOTES & DETAILS
SCALE: 1"=10'
SECTION A-A
OF PIT
BOTTOM
EXCEED A DEPTH OF 1½'.
AT NO TIME WILL WATER OR SLUDGE
OR EXPANDED.
AND PIT WILL BE CLEANED
DRILLING OPERATION SHALL CEASE
FILLED WITH SLUDGE,
IF SETTLING PIT BECOMES
WELL CAVITY AT 300'.
FLUSHING OF ENTIRE
VOLUME BASED ON SINGLE
STAKED HAYBALES
SIDE SLOPES = 1:1
DEPTH = 1½'
BOTTOM = 9' x 8'
SETTLING PIT
FILL SPECIFICATION GUIDELINES
PERCENT PASSING
LARGER THAN THREE INCHES.
THE FILL SHALL NOT CONTAIN ANY MATERIAL
een Associa
Gr
375.0 SF.
37.5 FT OF 12" HIGH BY 62" WIDE GST 6212 AT 10.0 SF/FT =
6212. SYSTEM TO BE INSTALLED LEVEL AT THE GRADES SHOWN.
12. INSTALL ONE ROW OF 37.5 FT OF 12" HIGH BY 62" WIDE GST
BEFORE INSTALLATION.
11. SYSTEM IS TO BE STAKED BY SURVEYOR OR ENGINEER
GRAVEL WITH LESS THAN 5% PASSING THE #200 SIEVE.
10. ALL SEPTIC FILL MATERIAL USED SHALL BE CLEAN COARSE
PROPERTY.
9. THERE ARE NO HOUSES OR STRUCTURES WITHIN 15' OF THE
APPROXIMATELY 12" BELOW GRADE.
8. PROVIDE A CLEANOUT CHIMNEY FOR SEPTIC TANK TO
FIELD SURVEYED.
7. CONTOURS IN THE AREA OF THE PROPOSED ACTIVITY WERE
OF THE PROPOSED WELL ON ADJACENT LOTS.
6. THERE ARE NO APPARENT SOURCES OF POLLUTION WITHIN 75'
SEPTIC SYSTEM.
5. THERE ARE NO EXISTING WELLS WITHIN 75' OF THE PROPOSED
OF THE TEST HOLES OBSERVED.
4. THE PROPOSED SEPTIC SYSTEM IS IN THE SAME GENERAL AREA
THE DRIVEWAY LOCATION. NO OTHER AREA WILL BE ACCEPTABLE.
3. THE CONSTRUCTION ENTRANCE PAD SHALL BE CONSTRUCTED AT
2. ALL MATERIAL NOT REQUIRED FOR GRADING WILL BE REMOVED.
1. MINIMUM SEPARATION FROM WELL TO SEPTIC SYSTEM - 75'.
(THIS IS THE GRAVEL PORTION OF THE SAMPLE.)
SAMPLE MAY BE RETAINED ON THE #4 SIEVE.
UP TO 45% OF THE DRY WEIGHT OF THE REPRESENTATIVE
CRITERIA:
THE REMAINING SAMPLE SHALL MEET THE FOLLOWING GRADATION
AND THE SIEVE ANALYSIS STARTED.
THE MATERIAL THAT PASSES THE #4 SIEVE IS THEN REWEIGHED
No. 200
No. 100
No. 40
No. 10
No. 4
SIEVE
0-2.5
0-5
10-75
70-100
100
DRY SIEVE
NOT EXCEED 5%.
DOES NOT EXCEED 10% AND THE No. 200 SIEVE DOES
GREATER THAN 75% IF THE PERCENT PASSING THE No. 100 SIEVE
* PERCENT PASSING THE No. 40 SIEVE CAN BE INCREASED TO NO
0-5
0-20
10-50 *
70-100
100
WET SIEVE
SEPTIC NOTES
H 0°00'00"
V 90°00'00"
Robert tes L.L.C.
Surveyors and Engineers
H 0°00'00"
V 90°00'00"
Robert Green Associates L.L.C.
Surveyors and Engineers
(860) 589-0135
TERRYVILLE, CONNECTICUT 06786
6 OLD WATERBURY ROAD
WORK DESCRIPTION
EROSION AND SEDIMENTATION CONTROL CHECKLIST
DATE INSTALLED INITIALS INITIALSDATE REMOVED
TOPSOIL, SEED AND MULCH ON DISTURBED AREAS
TOPSOIL STOCKPILE
CONSTRUCTION ENTRANCE
SEDIMENTATION CONTROL FENCE
No. 200
No. 100
No. 50
No. 30
No. 16
No. 8
No. 4
⅜"
SIEVE
0-5
0-10
5-30
25-60
50-85
80-100
95-100
100
PERCENT PASSING
ASTM C-33 SAND SPECIFICATIONS
CORRECT AS NOTED HEREON.
TO MY KNOWLEDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY
CORRECT AS NOTED HEREON.
TO MY KNOWLEDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY
SHEET 2 OF 3REG. NO. 0026292
JOSEPH M. GREEN P.E.
AS REQUIRED
CT DOT 2"
FILTER FABRIC
PUBLIC ROAD
6" MINIMUM
50' MINIMUM
CONSTRUCTION ENTRANCE
ORIGINAL GROUND
ORIGINAL GROUND
2.
3.
DEPTH
12" MIN.
SELF CLEANING.
STABILITY AND
UPSLOPE FOR
ANGLE 10°
DOWNSLOPE.
TRENCH, SET POSTS
EXCAVATE A 6"x6"
SET POSTS AND
THE TRENCH.
EXTEND IT TO
FABRIC AND
ATTACH FILTER
EXCAVATED SOIL.
COMPACT THE
TRENCH AND
BACKFILL THE
POSTS
BACKFILL
COMPACTED
SYNTHETIC FILTER BARRIER
PLACEMENT AND CONSTRUCTION OF A
4. COVER WITH TOPSOIL, MULCH AND SEED.
PRIOR TO COVERING TRENCHES.
3. INSTALL SEPTIC SYSTEM AND HAVE INSPECTED BY HEALTH DISTRICT
INSPECTION AND UPON APPROVAL, PLACE FILL AT 6" - 8" LIFTS TO GRADE.
2. SCARIFY SOIL IN SEPTIC AREA, CONTACT THE SANITARIAN FOR AN
BEING CAREFUL NOT TO COMPACT UNDERLYING SOIL.
1. REMOVE TREES, BRUSH, ROOTMAT AND TOPSOIL FROM AREA OF SYSTEM,
RECOMMENDED CONSTRUCTION SEQUENCE FOR SEPTIC SYSTEM
1.
100°
TRENCH=601.35
BOTTOM OF
FL=602.35
600
590
592
594
596
598
610
602
604
606
608
620
612
614
616
618
600
590
592
594
596
598
610
602
604
606
608
620
612
614
616
618
EXISTING GRADE
PROPOSED GRADE
MOTTLING (32")
LEDGE (56")
SELECT FILLPage 44
SCALES: AS NOTED MARCH 2, 2026
GRANBY, CONNECTICUT
83 BARKHAMSTED ROAD
JETMIRA LICENJI
ALBANO LICENJI &
PREPARED FOR
ASSESSORS LOT 5
SITE PLAN FOR HOUSE
FOR
MISCELLANEOUS NOTES & DETAILS
een Associa Gr
H 0°00'00"
V 90°00'00"
Robert tes L.L.C.
Surveyors and Engineers
H 0°00'00"
V 90°00'00"
Robert Green Associates L.L.C.
Surveyors and Engineers
(860) 589-0135
TERRYVILLE, CONNECTICUT 06786
6 OLD WATERBURY ROAD
CORRECT AS NOTED HEREON.
TO MY KNOWLEDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY
CORRECT AS NOTED HEREON.
TO MY KNOWLEDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY
SHEET 3 OF 3REG. NO. 0026292
JOSEPH M. GREEN P.E.
PUMP-OFF LEVEL (3" FROM BOTTOM)
SPECIFICATIONS:
PANEL, ALARM AND CIRCUIT BREAKER
UNDERGROUND CABLES TO PUMP CONTROL
WATERTIGHT ACCESS RISER TO GRADE
CHECK VALVE
GUIDE RAIL
WEEP HOLE
SINGLE PHASE, 208-230 VOLTS, 0.5 HP WITH 1½" DISCHARGE. PUMP# FL52A OR APPROVED EQUAL.
1. EFFLUENT PUMP TO BE LIBERTY FL50-SERIES, SUBMERSIBLE EFFLUENT PUMP,
PUMP INSTALLATION
JUNCTION BOX LOCATION (TYPE 6P)
36" OR LESS
FORCE MAIN WITH FREEZE PROTECTION
DISCONNECT COUPLING
WEEP HOLE
PUMP
JUNCTION BOX LOCATION (NEMA 3R OR 4X)
INLET (45" FROM BOTTOM)
EMERGENCY STORAGE VOLUME (332 GALLONS)
ALARM LEVEL (12" FROM BOTTOM)
PUMP-ON LEVEL (9" FROM BOTTOM)
DOSING VOLUME PER CYCLE (84 GALLONS)Page 45
Page 46
Page 47
Page 48
Page 49
Minutes: archived copy, SHA-256 2fd61071e915…. Agenda: archived copy, SHA-256 76b9ef05bbb3…. Packet: kept offline, SHA-256 f7958efa49b4….