Towns / Granby / Capital Program Priorities Advisory Committee / Jan 26, 2026

Capital Program Priorities Advisory Committee, Jan 26, 2026

Granby minutes posted

Documents

TypeDocumentPagesOpen
minutes Capital Program Priority Advisory Committee Regular Meeting Minutes 3 PDF download · town site
agenda Capital Program Priority Advisory Committee Regular Meeting 2 PDF download · town site
packet Capital Program Priority Advisory Committee Regular Meeting (packet) 34 PDF download · town site

Summary of the minutes

AI-generated summary. Each line links to the PDF page it came from; check it before relying on it.

Read the official minutes (PDF, 3 pages) The PDF is the record; this summary is a guide to it.

The committee approved the January 5, 2026 minutes 7-0-0 and heard presentations on proposed Stadium Field, track, and baseball/softball turf projects, with the Board of Education asking that a decision on the middle school project be postponed. It also heard a library fundraising update seeking $2 million in private support and $2-3 million in grants, and postponed the bonding capacity discussion to the next meeting.

Decisions (2) · all reported votes

  1. Approval of CPPAC Meeting Minutes – January 5, 2026
    Approved as presented
    Vote: Motion by J. Adams, seconded by D. Peling, carried 7-0-0 · p. 1
  2. Adjournment
    Meeting adjourned at 7:16 p.m.; next meeting set for Monday, February 2, 2026 at 5:00 p.m.
    Vote: Motion by J. Adams, seconded by M. Neumann, carried 7-0-0 · p. 2

Also discussed (6)

  • Board of Education – Stadium Field and High School Track proposal: Presentation by FieldTurf (Chris Hulk) on condition of existing site, post tension concrete design solution and proposed plan; no decision recorded · p. 1
  • Board of Education – Baseball and Softball Fields proposal: Presentation on proposal to convert existing high school baseball field to new all-weather turf facility; no decision recorded · p. 2
  • Board of Education – Middle School project: BOE requested CPPAC postpone a decision on this project pending a Full Facilities Condition Assessment (February) and an HVAC inspection (April) · p. 2
  • Library Fundraising and Grants (library expansion project) $2 million: Overview of fundraising campaign seeking $2 million in private support and Library Director pursuing $2-3 million in grants; no decision recorded · p. 2
  • Bonding Capacity Discussion: Postponed until the next CPPAC meeting in the interest of time · p. 2
  • Written public questions from Curt Johnson regarding CPPAC funding benchmarks and the $2,000,000.x estimate for three projects $2,000,000.x $13.5 million $15 million $1.8 million $2 million $6.5 million $7 million: Letter submitted to the chairman with four questions; attached to the minutes; no response or decision recorded · p. 3

This PDF is a scan; its text was read by OCR and may contain errors.

Summary of the agenda: Capital Program Priority Advisory Committee Regular Meeting

AI-generated summary.

This is the agenda for the Granby Capital Program Priority Advisory Committee's January 26, 2026 regular meeting. It lists items to be discussed, including approval of the January 5, 2026 minutes, presentations on capital priorities from the Board of Education and the Town, and a bonding capacity discussion.

On the agenda (4)

  1. Approval of CPPAC Regular Meeting Minutes - January 5, 2026 · p. 1
  2. Board of Education Presentation - Capital Priorities (Stadium Field and High School Track; Baseball and Softball Fields; Middle School) · p. 1
  3. Town Presentation - Capital Priorities: Library Fundraising and Grants · p. 1
  4. Bonding Capacity Discussion · p. 1

This PDF is a scan; its text was read by OCR and may contain errors.

Full text of the documents

View the minutes PDF on this page (Capital Program Priority Advisory Committee Regular Meeting Minutes) Open the PDF
Text read from the scanned minutes (OCR) (Capital Program Priority Advisory Committee Regular Meeting Minutes, 3 pages)

Page 1 · open in PDF

TOWN OF GRANBY 
CAPITAL PROGRAM PRIORITY ADVISORY COMMITTEE 
MEETING MINUTES 
JANUARY 26, 2026 
 
MEMBERS PRESENT: Kevin Hobson,  Chairman; John Adams, Margaret Chapple,  William 
Kennedy, Heather Lombardo, Mark Neumann, and David Peling 
 
EX OFFICIO MEMBERS PRESENT: Cheri Burke, Superintendent of Schools;  Mark Fiorentino, 
First Selectman; Michael Guarco, Chairman, Board of Finance; Monica Logan, Chairman, Board 
of Education, and Mike Walsh, Town Manager 
 
ABSENT: None 
 
Chairman Kevin Hobson called the meeting of the Capital Program Priorit y Advisory Committee 
to order at 5:00 p.m. 
 
1. PLEDGE OF ALLEGIANCE 
 
2. MINUTES 
2.I. Approval of CPPAC Meeting Minutes – January 5, 2026 
 
ON A MOTION by J. Adams, seconded by D. Peling, the Board voted (7-0-0) to approve 
the minutes of January 5, 2026, as presented. 
 
3. PUBLIC COMMENT 
The following residents spoke in support of the proposed projects to reconstruct Stadium Field 
and the track and to convert the existing baseball field at the high school to a new all-weather 
turf facility. 
David Peling, 15 Hampton Village Drive, Granby 
Joseph Lewie, 6 Candlewood Lane, Granby 
Mike Dombrowski, 7 Farmview Lane, North Granby 
Mark Migliaccio, 6 Black Oak Drive, West Granby 
 
Curt Johnson, 1 Fielding Woods, West Granby submitted a letter to the chairman with four 
questions pertaining to the funding of the capital projects and the CPPAC process. The letter 
is attached to the minutes.  
 
4. COMMUNICATIONS 
None. 
 
5. NEW BUSINESS 
5.I. Board of Education – Capital Priority Recommendations 
5.I.1. Stadium Field and High School Track 
Superintendent Cheri Burke introduced Chris Hulk, Vice President for New England 
from FieldTurf to present further information and details on the turf projects proposed 
for GMHS. The presentation included the condition of the existing site, the proposed 
post tension concrete design solution and the proposed plan.  

Page 2 · open in PDF

CPPAC Minutes 
1/26/26 
Page 2 
  
5.I.2. Baseball and Softball Fields 
The presentation also included an overview of the proposal to convert the existing 
baseball field at the high school to a new all-weather turf facility. 
 
The full presentation from FieldTurf is included as part of the CPPAC agenda packet 
on the Town website. 
 
5.I.3. Middle School 
A visual assessment of the current condition of the middle school was completed 
which identified several areas such as common areas and classroom spaces that 
are outdated, in poor condition and no longer serve the needs of the students and 
staff in a modern learning environment. However, the information from the visual 
assessment is not sufficient to form a project proposal at this time. The BOE is 
requesting CPPAC postpone a decision on this project until more information is 
gained through a Full Facilities Condition Assessment (February ), and an HVAC 
inspection (April).  Additional work has also been done on a ten-year certified 
enrollment projection and education specifications to meet the state requirements for 
reimbursement. 
 
5.II. Town – Capital Priority Recommendations 
5.II.1. Library Fundraising and Grants 
Amber Wyzik, Director of Library Services and Lauren Charamut, Chair of the 
Campaign Cabinet provided an overview of the fundraising efforts for the library 
expansion project. The campaign seeks to raise $2 million in private support –  an 
amount confirmed as achievable through a feasibility study to help fund the 
expansion and renovation of the Granby Public Library to better serve the 
community. Donations will support furnishings and shelving, quiet study rooms and 
other welcoming features. In addition, the Library Director is actively pursuing $2- 3 
million in grants which, along with the municipal bond, are expected to cover a 
significant portion of the cost of the project. A n umber of grant opportunities are in 
the pipeline and will be finalized over the next several months. 
 
The full library fundraising presentation is included as part of the CPPAC agenda 
packet on the Town website. 
 
6. BONDNG CAPACITY DISCUSSION 
This agenda item was postponed until the next CPPAC meeting in the interest of time. 
 
7. ADJOURNMENT 
ON A MOTION by J. Adams, seconded by M. Neumann, the Board voted ( 7-0-0) to adjourn 
the meeting at 7:16 p.m. 
 
The next meeting of the Capital Program Priority Advisory Committee will be held on Monday, 
February 2, 2026, at 5:00 p.m. in the Town Hall Meeting Room. 
 
Respectfully submitted,  
 
Betsy Mazzotta 
Recording Secretary 

Page 3 · open in PDF

To: Kevin Hobson, Chairman

Capital Program Priority Advisory Committee (CPPAC)

Cc: All Current and Ex Officio Members of CPPAC, and Betsy Mazzotta, Recording Secretary

From: Curt Johnson, West Granby CT

Date: January 26, 2026 (Hand Delivered at Public Session of CPPAC Meeting)

Dear Chairman Hobson:

I have listed below four questions as they pertain to large capital funding proposals submitted to CPPAC; your clarifications will be appreciated.

1) My understanding is that the capital projects identified as Sewer Pumps, Pickleball Courts and Bathroom at SBP are all considered large capital projects. The total sum of the preliminary estimates for the three projects is $2,000,000.x

Question: Is the $2,000,000.x total of the three projects to be included in the CPPAC capital funding benchmark for 2026/2027?

2) Based on December 31, 2025 “Bonding Timelines and Narrative” there is “a hypothetical example of the timelines and discussion of a $13.5 million referendum question(s) broken down into two projects:” “1. A $6.5 million capital project (CP 1) with immediate urgency and 2) A $7 million capital project (CP 2) with a longer planning cycle.”

Question: I have heard both a $13.5 million number and also a $15 million number for the potential maximum of CPPAC funding for 2026/2027 – what benchmark number is applicable?

3) During previous CPPAC meetings, I learned that if CPPAC bond funding exceeds a specific benchmark maximum (e.g. $13.5 million? or $15 million?) in all likelihood taxes will be increased based on the level of excess capital funding over the benchmark maximum of bonding.

Question: What is the maximum bonding benchmark for 2026/2027 and how will any excess bonding over the maximum bonding benchmark impact tax rates and debt service, a debt service that has been maintained at a historic $1.8 million?

4) Taking into account the above question #1, should the $2 million of the estimated total of the three proposed projects be included in the maximum bonding benchmark and debt service?

Question: If yes, would that decrease the balance of capital funding for other project proposals for CPPAC bonding e.g. $13.5 million minus $2 million = balance remaining of $11.5 million? Or e.g. $15 million minus $2 million = $13 million?

Thank you the courtesy of your clarifications.

Sincerely,

Curt Johnson

END

Curt Johnson
View the agenda PDF on this page (Capital Program Priority Advisory Committee Regular Meeting) Open the PDF
Text read from the scanned agenda (OCR) (Capital Program Priority Advisory Committee Regular Meeting, 2 pages)

Page 1 · open in PDF

Join Zoom Meeting

https://us02web.zoom.us/j/83309576581?

pwd=ipCe48UgtzuaNKnhWtmaWpOYLP1JKQ.1

Meeting ID: 833 0957 6581

Passcode: 215917

TOWN OF GRANBY

Capital Program Priority Advisory Committee (CPPAC)

Regular Meeting Agenda

Monday, January 26, 2026 – 5 p.m.

Town Hall Meeting Room

1. Pledge Of Allegiance
2. Approval Of CPPAC Regular Meeting Minutes - January 5, 2026

Documents:

CPPAC MINUTES 010526.PDF

3. Public Comment
4. Communications
5. New Business
5.I. Board Of Education Presentation - Capital Priorities

Documents:

BOE DISCUSSION FOR CPPAC 1.26.26.PDF

5.I.i. Stadium Field And High School Track
5.I.ii. Baseball And Softball Fields
5.I.iii. Middle School
5.II. Town Presentation - Capital Priorities
5.II.i. Library Fundraising And Grants

Documents:

CPPAC 1.26.26 QA GRANTS AND FUNDRAISING.PDF

6. Bonding Capacity Discussion

Documents:

BONDING CAPACITY.PDF

Page 2 · open in PDF

7. Adjournment

The next regular meeting of the Town of Granby CPPAC is scheduled for Monday, February 2, 2026, at 5 p.m. in the Town Hall Meeting Room.
View the packet PDF on this page (Capital Program Priority Advisory Committee Regular Meeting (packet)) Open the PDF
Text of the packet (Capital Program Priority Advisory Committee Regular Meeting (packet), 34 pages)

Page 1 · open in PDF

Join Zoom Meeting
https://us02web.zoom.us/j/83309576581?
pwd=ipCe48UgtzuaNKnhWtmaWpOYLP1JKQ.1
Meeting ID: 833 0957 6581
Passcode: 215917
TOWN OF GRANBY
Capital Program Priority Advisory Committee (CPPAC)
Regular Meeting Agenda
Monday, January 26, 2026 – 5 p.m.
 Town Hall Meeting Room
Pledge Of Allegiance
Approval Of CPPAC Regular Meeting Minutes - January 5, 2026
CPPAC MINUTES 010526.PDF
Public Comment
Communications
New Business
Board Of Education Presentation - Capital Priorities
BOE DISCUSSION FOR CPPAC 1.26.26.PDF
Stadium Field And High School Track
Baseball And Softball Fields
Middle School
Town Presentation - Capital Priorities
Library Fundraising And Grants
CPPAC 1.26.26 QA GRANTS AND FUNDRAISING.PDF
Bonding Capacity Discussion
BONDING CAPACITY.PDF
Adjournment
The next regular meeting of the Town of Granby CPPAC is scheduled for Monday, 
February 2, 2026, at 5 p.m. in the Town Hall Meeting Room.
1.
2.
Documents:
3.
4.
5.
5.I.
Documents:
5.I.i.
5.I.ii.
5.I.iii.
5.II.
5.II.i.
Documents:
6.
Documents:
7.

Page 2 · open in PDF

Join Zoom Meeting
https://us02web.zoom.us/j/83309576581?
pwd=ipCe48UgtzuaNKnhWtmaWpOYLP1JKQ.1
Meeting ID: 833 0957 6581
Passcode: 215917
TOWN OF GRANBY
Capital Program Priority Advisory Committee (CPPAC)
Regular Meeting Agenda
Monday, January 26, 2026 – 5 p.m.
 Town Hall Meeting Room
Pledge Of Allegiance
Approval Of CPPAC Regular Meeting Minutes - January 5, 2026
CPPAC MINUTES 010526.PDF
Public Comment
Communications
New Business
Board Of Education Presentation - Capital Priorities
BOE DISCUSSION FOR CPPAC 1.26.26.PDF
Stadium Field And High School Track
Baseball And Softball Fields
Middle School
Town Presentation - Capital Priorities
Library Fundraising And Grants
CPPAC 1.26.26 QA GRANTS AND FUNDRAISING.PDF
Bonding Capacity Discussion
BONDING CAPACITY.PDF
Adjournment
The next regular meeting of the Town of Granby CPPAC is scheduled for Monday, 
February 2, 2026, at 5 p.m. in the Town Hall Meeting Room.
1.
2.
Documents:
3.
4.
5.
5.I.
Documents:
5.I.i.
5.I.ii.
5.I.iii.
5.II.
5.II.i.
Documents:
6.
Documents:
7.

Page 3 · open in PDF

TOWN OF GRANBY 
CAPITAL PROGRAM PRIORITY ADVISORY COMMITTEE 
MEETING MINUTES 
JANUARY 5, 2026 
 
MEMBERS PRESENT: Kevin Hobson, Chairman;  John Adams, Margaret Chapple,  William 
Kennedy, Heather Lombardo, Mark Neumann, and David Peling 
 
EX OFFICIO MEMBERS PRESENT: Cheri Burke, Superintendent of Schools;  Mark Fiorentino, 
First Selectman; Michael Guarco, Chairman, Board of Finance; Monica Logan, Chairman, Board 
of Education, and Mike Walsh, Town Manager 
 
ABSENT: None 
 
Chairman Kevin Hobson called the meeting of the Capital Program Priorit y Advisory Committee 
to order at 5:02 p.m. 
 
1. PLEDGE OF ALLEGIANCE 
 
2. MINUTES 
2.I. Approval of CPPAC Meeting Minutes – November 24, 2025 
 
ON A MOTION by M. Neumann, seconded by H. Lombardo, the Board voted (6-0-1) to 
approve the minutes of November 24, 2025, as presented. W. Kennedy abstained. 
 
3. PUBLIC COMMENT 
The following residents spoke in favor of the proposed project to reconstruct the existing 
baseball field at the high school to a new all-weather turf facility. 
Chris Perry, 7 Brianwood Lane, Granby 
Greg Dion, 62 Silver Brook Lane, North Granby 
Mike Dombrowski, 7 Farmview Lane, North Granby 
 
4. COMMUNICATIONS 
Town Manager Mike Walsh reviewed several documents related to the Town’s capital 
project requests and addressed questions from the committee. 
4.I. December 31, 2025, Memo – Transmittal of Updated & New Capital Project Information 
4.I.1. Board of Selectmen December 10, 2025, Memo on CIP Amendments 
The memo outlines the refinements made  to the line items for the Pump Station 
Maintenance project ($1.5 million) and the Salmon Brook Park Pickleball Courts and 
Bathroom ($500,000) on the Capital Improvement Plan approved by the Board of 
Selectmen in December. 
4.I.2. Amended 10-Year Capital Improvement Plan 
The updated plan includ es the changes to the Pump Station Maintenance project 
and the Salmon Brook Park Pickleball Courts and Bathroom approved by the Board 
of Selectmen. 
4.I.3. “Short List” of Town Capital Items with Requested Bonding Highlighted 
The single page report highlights the three major project proposals by the T own 
including the pump station maintenance at $1.5 million, the library renovation at $7 
million and the pickleball courts and bathroom at Salmon Brook Park for $500,000. 

Page 4 · open in PDF

CPPAC Minutes 
1/5/26 
Page 2 
  
4.I.4. Board of Selectmen, Board of Finance, Board of Education, and CPPAC December 
31, 2025, Memo on Bonding Timeline and Narrative – Illustrative Outline 
The memo provides an illustrative outline of possible bonding timelines and the 
supporting narrative explaining the process . E mphasizing that significant pre -
planning is needed to execute the construction of a project, the underwriting and sale 
of the bonds and to budget debt service. 
4.I.5. 12 Pages of Individual and Combined Debt Service Modeling 
A variety of bond amortizations for each proposed project  and also in total were 
provided for review by the committee. 
4.I.6. A Two-Page “Crosswalk” Detailing Stabilized Debt Service (in lieu of volatile Debt 
Service) 
The Crosswalk re-amortizes the models to reflect how the Tow n issues bonds 
showing interest only payments for  the first two years and a reduction of principal 
and interest for the last 18 years. The document illustrates  that the Town can 
maintain level debt service through the middle of 2037 with a $13.5 million bond 
issuance. This also assumes the Town receives $1 million of bond premium to the 
debt service fund. 
4.I.7. A Six-Page CIP Policy Discussion Focusing on Town Bond Requests 
The document includes the background, description and estimates of the Pump 
Station Maintenance Project and the Pickleball Courts and Bathroom Project at 
Salmon Brook Park. The projects must be approved by the voters to become a lawful 
appropriation before further work can be done to scope the project and go out to bid. 
4.I.8. Pictures and Backup Materials (pages 1-11) for Town Requested Bonding Items 
 
ON A MOTION by J. Adams, seconded by M. Neumann, the Board voted ( 7-0-0) to reorder the 
agenda to move Town - Capital Priority Recommendations before Board of Education - Capital 
Priority Recommendations under New Business. 
 
5. NEW BUSINESS 
5.I. Town – Capital Priority Recommendations 
5.I.1. Sewer Pumps 
The Town operates three sewer pumps (Salmon Brook Park, Route 10, and Route 
189) that are approaching 50 years old. The pumps are functional, however in the 
last 12 months there have been two failures caused by the backup of nip bottles and 
grease from restaurants. 
 
The Town secured three estimates for the maintenance which includes updated 
mechanicals and electricals, replacement parts and additional monitoring  equipment 
which is  needed to improve reliability and sustainability to extend the life of the 
existing pumps by an estimated 50 years or more. The estimated cost of the project 
including bond issuance costs is $1.5 million. 
 
The Town is recommending a 20- year bond issuance with debt service paid out of 
the Sewer Utility Fund. The special revenue fund has a balance of $902K from sewer 
assessment fees paid by sewer users and is intended to pay for the needed 
maintenance work on the system or to support the debt service should bonds be 
issued. Given the size of the Sewer Utility Fund balance, debt service payments for 
the maintenance of the sewer pumps should not have any material impact on the 
future rates for sewer users. 
 

Page 5 · open in PDF

CPPAC Minutes 
1/5/26 
Page 3 
  
5.I.2. Pickleball Courts/ SBP Public Bathroom Facility 
The Town provides pickleball courts for use by residents on the existing tennis courts 
at Salmon Brook Park. Due to several noise complaints from the neighboring 
condominiums, noise abatement was considered. In the short term, noise reducing 
barriers have been purchased and will be installed at the tennis courts in the spring 
of 2026, however the permanent solution is to relocate the pickleball  courts to an 
area in the park away from residential housing. The addition of standalone pickleball 
courts at Salmon Brook Park is strongly supported by residents, recommended by 
the Parks and Recreation Board, and was also identified as part of the GZA Parks 
Master Plan. The estimated cost of the project to constr uct four pickleball courts is 
$250,000. 
 
The Town is recommending a 20- year bond issuance with debt service paid out of 
the Parks and Recreation Fund. The special revenue fund has a balance of $432K 
which is primarily funded by users of the parks system through program and rental 
fees and would pay for the courts or support the debt service if bonds are issued.  
 
Secondly, the addition of a year-round restroom at the northern end of Salmon Brook 
Park is also strongly supported by the residents, recommended by the Parks & 
Recreation Board, and was also identified as part of the GZA Parks Master Plan. The 
estimated cost of the facility would be $250,000 and the Town is recommending a 
20-year bond issuance which would also be supported by the Parks & Recreation 
Fund. 
 
The committee discussed the recommendations put forward by the Town, clarifying 
that these two projects will be paid for through the Sewer Utility Fund and the Parks 
and Recreation Fund and will not impact the General Fund. 
 
ON A MOTION by  M. Neumann, seconded by  W. Kennedy, the Board voted ( 7-0-0) to forward 
the Town Sewer Pump Project at $1.5 million and the Pickleball Courts and Bathroom Facility at 
Salmon Brook Park project at $500,000 as defined in the December 4, 2025, document from the 
Town Manager to the Board of Selectmen for consideration. 
 
5.II. Board of Education – Capital Priority Recommendations 
Chairman Monica Logan presented the capital project recommendations for the Board 
of Education emphasizing that the focus and direction of the BOE has changed based 
on information received during the CPPAC process. 
5.II.1. High School Track 
This project proposes the replacement of Stadium Field and Field Two at Granby 
Memorial High School to address structural failures, age, and safety concerns. The 
existing turf track and field system was origi nally installed in 2013 and  has been 
carefully maintain ed. However, the significant subsurface failures cannot  be 
resolved through surface repairs. These conditions have led to restrictions on use 
and pose ongoing risks to student-athletes, staff, and community members. Field 
Two does not have the same issues as Stadium Field, however it is the same age 
and resurfacing at this time is recommended. Completing both fields at the same 
time allows for a cost savings of $125,000. 
 
The Board of Education is recommending a $6.1 million project to reconstruct  
Stadium Field and the track surface  using a post -tension concrete system to 

Page 6 · open in PDF

CPPAC Minutes 
1/5/26 
Page 4 
  
provide long- term structural stability. Additionally, the p roject would include the 
installation of new synthetic turf and track surfacing, improve drainage, fencing and 
associated site work as well as the installation of new, energy efficient LED light 
fixtures at Stadium Field and Field Two. 
 
5.II.2. Middle School 
As presented in prior CPPAC meetings, the Middle School was constructed in 
1992 and most of the building’s major systems are now over 30 years old. A Visual 
Facilities Condition Assessment conducted in May 2025 found that while the 
building remains functional, many of the mechanical systems have exceeded their 
useful life and require upgrades to ensure continued safe and effective operation. 
However, acknowledging that these renovations will need to be completed in the 
future, the Board of Education does not feel they currently have enough 
information to evaluate the project in order to properly  maximize potential 
reimbursements through the state, minimize disruptions to students and staff  and 
to avoid building code issues. Therefore, at this time the BOE has scaled back the 
project and is requesting $1.75 million for a comprehensive facilities assessment  
and to address immediate repairs. 
 
The Board of Education is also recommending a project for approximately $3.4 
million (plus an 8%-10% contingency and $750,000 for LED light fixtures ) to 
reconstruct the baseball field at the high school into a new, all -weather synthetic 
turf facility. The field is in very poor condition due to over use and the lack of 
irrigation, and the natural grass has become  difficult for staff to main tain. The 
surrounding area including dugouts, bleachers, fencing and walkways also need 
to be improved or replaced. These additional elements may be added to the project 
depending on the final scope and funding. The goal of the project is to create a 
durable, multi-use athletic venue that increases field availability, improves safety 
and play ability, and reduces weather related disruptions and long- term 
maintenance costs. 
 
Discussion of the Board of Education capital priority recommendations will continue  at the next 
meeting of the Capital Program Priority Advisory Committee. 
 
Reports, photos, plans and backup materials for the projects dis cussed can be found as part of 
the CPPAC agenda packet on the Town website. 
 
6. ADJOURNMENT 
ON A MOTION by J. Adams, seconded by M. Neumann, the Board voted ( 7-0-0) to adjourn 
the meeting at 6:51 p.m. 
 
The next meeting of the Capital Program Priority Advisory Committee will be held on Monday, 
January 26, 2026, at 5:00 p.m. in the Town Hall Meeting Room. 
 
Respectfully submitted,  
 
Betsy Mazzotta 
Recording Secretary 

Page 7 · open in PDF

January
 
23,
 
2026
 
 
To
 
ensure
 
our
 
upcoming
 
CPPAC
 
meeting
 
is
 
as
 
productive
 
as
 
possible,
 
we
 
have
 
provided
 
answers
 
to
 
your
 
preliminary
 
list
 
of
 
questions
 
below
 
in
 
GREEN
.
 
 
 
Chris
 
Hulk,
 
Regional
 
Vice
 
President
 
for
 
New
 
England
 
from
 
Turf
 
Field,
 
will
 
be
 
joining
 
the
 
meeting
 
to
 
provide
 
further
 
information
 
and
 
details
 
for
 
the
 
turf
 
projects
 
proposed
 
for
 
GMHS.
 
General
 
/
 
All
 
Projects
 
Budgeting:
 
Do
 
the
 
most
 
recent
 
request
 
figures
 
include
 
contingencies
 
and/or
 
project
 
management
 
fees?
 
Please
 
see
 
this
 
pricing
 
summary
 
for
 
the
 
field
 
projects.
 
We
 
do
 
not
 
have
 
a
 
comprehensive
 
project
 
developed
 
for
 
GMHS,
 
so
 
this
 
is
 
not
 
available
 
at
 
this
 
time.
 
Recommended
 
Contingency
 
to
 
be
 
added:
 
8%–10%
 
for
 
design,
 
general
 
conditions,
 
and
 
construction
 
to
 
account
 
for
 
unknown
 
site
 
conditions.
 
This
 
does
 
not
 
include
 
project
 
management.
 
*Football&
 
Track
 
Field
  
 
 
*Stadium
 
Field
 
includes:
 
boys/girls
 
soccer,
 
boys/girls
 
lacrosse,
 
ultimate
 
frisbee,
 
football,
 
fieldhockey,
 
boys/girls
 
track&field,
 
cheerleading,
 
and
 
unified
 
sports)
 
Full
 
Site:
 
Visual
 
of
 
all
 
fields
 
proposed
.
 
 
LED
 
Lighting:
 
We’ve
 
discussed
 
potential
 
ROI
 
within
 
3–5
 
years.
 
Please
 
be
 
prepared
 
to
 
provide
 
2024–2025
 
high
 
school
 
energy
 
costs
 
(broken
 
down
 
by
 
quarter).
 
Are
 
the
 
lights
 
primarily
 
utilized
 
during
 
Q2
 
and
 
Q3?
 
With
 
regard
 
to
 
the
 
athletic
 
lights,
 
we
 
do
 
receive
 
a
 
separate
 
electric
 
bill
 
for
 
those
 
lights.
 
We
 
keep
 
track
 
of
 
the
 
electricity
 
data
 
usage,
 
and
 
in
 
reviewing
 
the
 
data,
 
the
 
most
 
expensive
 
months
 
are
 
September
 
through
 
December
 
and
 
then
 
April
 
to
 
June.
 
The
 
following
 
is
 
the
 
TOTAL
 
annual
 
usage
 
of
 
those
 
lights,
 
both
 
supply
 
and
 
delivery.
 
 
 
FY
 
2025
 
-
 
$17,940
 
FY
 
2024-
 
$15,540
 
FY
 
2023
 
-
 
$17,120
 
FY
 
2022
 
-
 
$16,020
 
 
 
The
 
four-year
 
average
 
is
 
$16,655.
 
Safety
 
Netting:
 
This
 
was
 
included
 
in
 
the
 
original
 
quote—what
 
were
 
the
 
considerations
 
for
 
its
 
removal
 
in
 
the
 
latest
 
request?
 
This
 
was
 
suggested
 
as
 
an
 
add-on,
 
it
 
is
 
not
 
there
 
because
 
we
 
are
 
keeping
 
costs
 
down.
 
The
 
only
 
"add-on"
 
requested
 
is
 
LED
 
lights.
 
We
 
put
 
this
 
as
 
a
 
separate
 
line
 
item
 
just
 
because
 
of
 
the
 
costs.
 
However,
 
it
 
is
 
strongly
 
recommended
 
by
 
the
 
Field
 
Turf
 
professional
 
that
 
by
 
adding
 
netting,
 
the
 
track
 
and
 
field
 
can
 
be
 
used
 
at
 
the
 
same
 
time.
 

Page 8 · open in PDF

 
Exclusions:
 
Please
 
be
 
prepared
 
to
 
review
 
the
 
FieldTurf
 
"project
 
exclusions"
 
list
 
with
 
the
 
committee
 
to
 
discuss
 
potential
 
impacts.
 
EXCLUSIONS:
 
➢
 
Any
 
costs
 
associated
 
with
 
necessary
 
charges
 
relating
 
to
 
the
 
delineation
 
of
 
the
 
field
 
➢
 
The
 
supply
 
of
 
manholes
 
or
 
clean-outs
 
or
 
grates,
 
or
 
the
 
supply
 
of
 
the
 
manhole
 
covers
 
outside
 
of
 
the
 
field
 
area
 
➢
 
Any
 
alteration
 
or
 
deviation
 
from
 
specifications
 
involving
 
extra
 
costs,
 
which
 
alteration
 
or
 
deviation
 
will
 
be
 
provided
 
only
 
upon
 
executed
 
change
 
orders,
 
and
 
will
 
become
 
an
 
extra
 
charge
 
over
 
and
 
above
 
the
 
offered
 
price
 
➢
 
Soil
 
stabilization
 
or
 
remediation
 
of
 
any
 
type
 
➢
 
Rock
 
excavation
 
or
 
ledge
 
removal
 
➢
 
Offsite
 
disposal
 
of
 
generated
 
spoils
 
other
 
than
 
topsoil
 
➢
 
Taxes
 
➢
 
Excavation
 
or
 
disposal
 
of
 
unsuitable
 
or
 
contaminated
 
soils
 
➢
 
Site
 
security,
 
including
 
security
 
fencing
 
➢
 
Once
 
subgrade
 
has
 
been
 
established,
 
a
 
proof
 
roll
 
will
 
be
 
performed
 
to
 
ensure
 
structural
 
stability
 
of
 
the
 
soils;
 
if
 
unsuitable
 
soils
 
are
 
encountered,
 
a
 
price
 
to
 
remedy
 
these
 
areas
 
can
 
be
 
negotiated
 
based
 
on
 
recommended
 
methods
 
per
 
the
 
project
 
Engineer
 
➢
 
Testing
 
or
 
Inspection
 
Fees
 
➢
 
Site
 
restoration,
 
sodding,
 
landscaping,
 
or
 
grow-
 
in
 
beyond
 
disturbed
 
areas
 
➢
 
Repair
 
or
 
resurfacing
 
existing
 
asphalt
 
parking
 
lot
 
if
 
damaged
 
by
 
truck
 
traffic
 
➢
 
Bond
 
fees
 
and
 
non-local
 
permits
 
Baseball
 
&
 
Softball
 
Fields
 
(and
 
multipurpose
 
outfield
 
for
 
soccer,
 
lacrosse,
 
and
 
field
 
hockey
 
as
 
needed)
 
Scope
 
&
 
Design:
 
Please
 
provide
 
site
 
plans,
 
location
 
for
 
the
 
multi-purpose
 
field,
 
and
 
details
 
on
 
expected
 
student
 
population
 
usage.
 
Please
 
see
 
the
 
project
 
proposal
 
linked
 
here
.
 
We
 
can
 
not
 
go
 
to
 
RFP
 
for
 
a
 
true
 
project
 
rendering
 
until
 
a
 
vote
 
is
 
passed.
 
 
Considering
 
field
 
use
 
for
 
Junior
 
Varsity
 
and
 
Varsity
 
teams
 
for
 
baseball
 
and
 
softball,
 
and
 
additional
 
use
 
for
 
soccer
 
and
 
other
 
sports
 
for
 
Freshman
 
games,
 
we
 
anticipate
 
234
 
student
 
athletes
 
to
 
use
 
the
 
stadium
 
field
 
and
 
the
 
baseball/multipurpose
 
field
 
each
 
year
 
over
 
the
 
life
 
of
 
the
 
field
 
.(including
 
boys/girls
 
soccer,
 

Page 9 · open in PDF

boys/girls
 
lacrosse,
 
ultimate
 
frisbee,
 
football,
 
fieldhockey,
 
boys/girls
 
track&field,
 
cheerleading
 
and
 
unified
 
sports)
 
In
 
addition,
 
there
 
is
 
interest
 
from
 
Rovers,
 
Little
 
League,
 
and
 
men/women's
 
recreational
 
leagues
 
to
 
use
 
the
 
fields.
 
 
We
 
have
 
an
 
overall
 
rendering
 
in
 
2D
 
for
 
the
 
site
 
included
 
in
 
the
 
project
 
proposal
 
linked
 
here
.
 
If
 
we
 
engage
 
in
 
an
 
initial
 
'pre-construction'
 
/
 
design
 
agreement
 
with
 
Field
 
Turf,
 
we
 
can
 
include
 
3D
 
renderings
 
of
 
the
 
fields.
 
That
 
cost
 
would
 
be
 
approximately
 
$29.5k
 
and
 
is
 
attached
 
as
 
a
 
CREC
 
Co
 
Op
 
Proposal.
 
An
 
example
 
of
 
a
 
3D
 
rendering
 
can
 
be
 
viewed
 
here
.
 
Field
 
Composition:
 
What
 
were
 
the
 
considerations
 
regarding
 
upgrading
 
current
 
fields
 
versus
 
new
 
construction?
 
Was
 
a
 
hybrid
 
option
 
(dirt
 
infield/turf
 
outfield)
 
evaluated?
 
Is
 
there
 
a
 
comparative
 
cost
 
to
 
revive
 
the
 
current
 
fields
 
with
 
new
 
infields
 
and
 
dugouts?
 
 
The
 
typical
 
cost
 
to
 
do
 
a
 
new
 
turf
 
field
 
versus
 
renovating
 
a
 
grass
 
field
 
properly
 
is
 
about
 
20%
 
more.
 
 
The
 
main
 
driving
 
factor
 
used
 
by
 
industry
 
professionals
 
is
 
the
 
cost
 
per
 
hour
 
of
 
use.
 
Grass
 
fields
 
are
 
intended
 
to
 
be
 
used
 
10-12
 
hours
 
per
 
week
 
so
 
that
 
they
 
can
 
be
 
maintained
 
and
 
preserved
 
at
 
a
 
maintainable
 
level.
 
As
 
indicated
 
in
 
the
 
2008
 
report
 
(
section
 
1
,
 
section
 
2
,
 
section
 
3
),
 
this
 
is
 
not
 
possible
 
with
 
the
 
needs
 
of
 
our
 
current
 
baseball
 
field.
 
A
 
turf
 
field,
 
especially
 
with
 
lights,
 
allows
 
40+
 
hours
 
of
 
use
 
a
 
week.
 
This
 
then
 
opens
 
it
 
up
 
to
 
use
 
by
 
Granby
 
town
 
teams,
 
club
 
teams,
 
adult
 
leagues,
 
etc,
 
that
 
are
 
not
 
provided
 
access
 
to
 
our
 
grass
 
fields
 
now.
 
So
 
the
 
cost
 
per
 
hour
 
of
 
use
 
goes
 
down
 
to
 
about
 
1/4
 
of
 
the
 
cost
 
of
 
a
 
grass
 
field
 
when
 
you
 
do
 
the
 
life
 
span
 
analysis.
 
 
Clay
 
fields
 
are
 
not
 
recommended.
 
Reports
 
from
 
districts
 
that
 
have
 
clay
 
are
 
dissatisfied
 
due
 
to
 
tracking
 
and
 
marks
 
in
 
the
 
field
 
that
 
look
 
terrible
 
and
 
are
 
very
 
hard
 
to
 
repair.
 
(Note:
 
Connecticut
 
Interscholastic
 
Athletic
 
Conference)
 
Data
 
and
 
regional
 
athletic
 
trends
 
suggest
 
that
 
approximately
 
10%
 
to
 
15%
 
of
 
Connecticut
 
high
 
school
 
baseball
 
fields
 
are
 
currently
 
synthetic
 
turf.)
 
We
 
can
 
not
 
find
 
this
 
data
 
point
 
confirmed
 
anywhere.
 
In
 
speaking
 
with
 
both
 
Harford
 
area
 
superintendents
 
and
 
turf
 
field
 
professionals,
 
they
 
report
 
a
 
significant
 
increase
 
in
 
the
 
number
 
of
 
baseball
 
fields
 
being
 
done
 
in
 
the
 
last
 
couple
 
of
 
years.
 
This
 
is
 
due
 
to
 
the
 
short
 
spring
 
season
 
for
 
spring
 
sports
 
and
 
the
 
negative
 
impact
 
of
 
New
 
England
 
weather.
 
The
 
turf
 
field
 
would
 
allow
 
year-long
 
use
 
with
 
no
 
rest.
 
 
We
 
are
 
currently
 
gathering
 
data
 
from
 
athletic
 
directors
 
across
 
the
 
state
 
for
 
accurate
 
information
 
on
 
the
 
number
 
of
 
turf
 
fields.
 
Glastonbury
 
public
 
schools
 
just
 
compiled
 
a
 
list
 
for
 
their
 
project
 
proposal
 
and
 
reported
 
to
 
the
 
Glastonbury
 
Board
 
of
 
Education
 
that
 
28
 
out
 
of
 
31
 
of
 
the
 
districts
 
in
 
their
 
conference
 
have
 
at
 
least
 
one
 
turf
 
playing
 
field.
 
Environmental
 
Impact:
 
Are
 
there
 
any
 
known
 
environmental
 
impacts
 
of
 
installing
 
a
 
new
 
turf
 
field?
 
There
 
is
 
no
 
impact.
 
CTDEEP
 
has
 
various
 
findings
 
right
 
on
 
their
 
website
.
 
Water
 
coming
 
from
 
the
 
field
 
is
 
filtered
 
through
 
the
 
stone
 
base
 
and
 
typically
 
comes
 
out
 
cleaner
 
from
 
the
 
site
 
than
 
what
 
is
 
found
 
prior
 
to
 
installing
 
turf.
 
All
 
FieldTurf
 
materials
 
will
 
be
 
PFAS-free
 
starting
 
in
 
'26.
 
We
 
are
 
preparing
 
a
 
more
 
comprehensive
 
package
 
on
 
turf
 
fields
 
for
 
public
 
consumption
 
in
 
the
 
near
 
future.
 

Page 10 · open in PDF

Add-Ons
 
&
 
Maintenance:
 
Are
 
there
 
"extras"
 
(scoreboards,
 
lights,
 
fencing)
 
required
 
that
 
aren't
 
in
 
the
 
base
 
quote?
 
Additionally,
 
what
 
are,
 
if
 
any,
 
the
 
recurring
 
maintenance
 
costs
 
for
 
these
 
fields?
 
Turf
 
Field
 
Co.
 
provides
 
the
 
equipment
 
and
 
training
 
for
 
Granby
 
Public
 
Schools
 
staff
 
to
 
complete
 
maintenance
 
independently.
 
There
 
are
 
also
 
options
 
to
 
have
 
a
 
service
 
plan
 
where
 
Field
 
Turf
 
would
 
provide
 
professional
 
services,
 
which
 
is
 
approximately$3,500
 
per
 
year
 
per
 
field.
 
For
 
multiple
 
fields,
 
we
 
would
 
receive
 
a
 
discount,
 
so
 
the
 
overall
 
cost
 
would
 
be
 
approximately
 
$8,500
 
per
 
year.
 
 
Existing
 
Equipment:
 
Does
 
the
 
quote
 
include
 
the
 
grandstand
 
seating
 
shown
 
in
 
the
 
overview?
 
Regarding
 
the
 
scoreboard,
 
was
 
a
 
new
 
one
 
considered,
 
or
 
is
 
the
 
current
 
one
 
reusable?
 
Nothing
 
new
 
is
 
included;
 
these
 
are
 
all
 
optional
 
add-ons.
 
The
 
base
 
price
 
is
 
generally
 
rebuilding
 
the
 
field...
 
fence
 
line
 
and
 
inside.
 
Everything
 
outside
 
of
 
that
 
would
 
be
 
an
 
add-on.
 
We
 
try
 
to
 
structure
 
the
 
pricing
 
as
 
"need
 
to
 
have"
 
versus
 
"nice
 
to
 
have".
 
Timeline
 
&
 
Exclusions:
 
 
Exclusions
 
are
 
answered
 
above.
 
The
 
full
 
report
 
can
 
be
 
viewed
 
here
.
 
 
What
 
is
 
the
 
estimated
 
completion
 
timeline?
 
 
From
 
Field
 
Turf
 
professionals:
 
“Generally,
 
each
 
field
 
would
 
be
 
3-4
 
months.
 
However,
 
with
 
various
 
fields
 
on
 
one
 
side,
 
we
 
can
 
move
 
crews
 
from
 
one
 
field
 
to
 
the
 
next
 
in
 
a
 
staggered
 
manner
 
to
 
get
 
that
 
timeframe
 
down.
 
We
 
would
 
suggest
 
starting
 
the
 
Stadium
 
Field
 
in
 
May,
 
so
 
it
 
is
 
complete
 
for
 
mid-August.
 
The
 
second
 
field
 
would
 
be
 
replaced
 
after
 
school
 
is
 
over,
 
so
 
you
 
have
 
facilities
 
available
 
during
 
the
 
full
 
year.
 
And
 
then
 
baseball
 
would
 
be
 
done
 
in
 
the
 
late
 
summer
 
/fall.
 
The
 
full
 
project
 
would
 
be
 
May
 
-
 
Early
 
December.
 
GMMS
 
Architectural
 
Fees:
 
Can
 
you
 
walk
 
the
 
committee
 
through
 
the
 
methodology
 
used
 
to
 
arrive
 
at
 
the
 
$1.75M
 
quote
 
for
 
architectural
 
design
?
 
If
 
this
 
includes
 
repairs,
 
please
 
outline.
 
 
In
 
our
 
previous
 
CPPAC
 
Discussion
 
Memo
 
(linked
 
here)
 
We
 
state:
 
“Specific
 
HVAC
 
assessment
 
will
 
be
 
complete
 
in
 
April
 
of
 
2026.
 
In
 
addition,
 
the
 
Board
 
of
 
Education
 
will
 
contract
 
for
 
a
 
comprehensive
 
Facilities
 
Conditions
 
Assessment
 
to
 
determine
 
priorities
 
and
 
engage
 
in
 
architectural
 
plans
 
for
 
future
 
consideration.”
 
This
 
is
 
now
 
scheduled
 
for
 
February
 
17th
 
and
 
18th.
 
“In
 
reliance
 
upon
 
previously
 
done
 
repairs
 
and
 
the
 
visual
 
assessment,
 
the
 
estimate
 
at
 
this
 
time
 
to
 
conduct
 
necessary
 
repairs
 
and
 
engage
 
with
 
an
 
architectural
 
design
 
firm
 
is
 
$1.75
 
Million.”
 
Terracon
 
Estimate:
 
The
 
report
 
identifies
 
$3.1M
 
in
 
total
 
replacement
 
costs
 
over
 
10
 
years,
 
with
 
$1.69M
 
labeled
 
as
 
"immediate."
 
Is
 
the
 
current
 
recommendation
 
to
 
defer
 
all
 
of
 
these
 
items?
 
If
 
so,
 
please
 
be
 
prepared
 
to
 
discuss
 
the
 
rationale.
 
As
 
we
 
have
 
shared
 
previously,
 
a
 
visual
 
inspection
 
of
 
GMMS
 
was
 
done
 
as
 
an
 
initial
 
look
 
at
 
the
 
building.
 
We
 
have
 
now
 
completed
 
the
 
necessary
 
ed
 
specifications
 
meetings,
 
and
 
that
 
report
 
is
 
being
 
compiled
 
now.
 
We
 
have
 
an
 
HVAC
 
inspection
 
being
 
conducted
 
over
 
the
 
April
 
school
 
break,
 
and
 
we
 
have
 
a
 
Full
 
Facilities
 
Conditions
  
Assessment
 
being
 
conducted
 
over
 
the
 
long
 
Presidents'
 
weekend
 
in
 
February.
 
There
 
is
 
a
 
comprehensive
 
enrollment
 
study
 
being
 
presented
 
at
 
the
 
February
 
18th
 
BOE
 
meeting.
 

Page 11 · open in PDF

These
 
final
 
reports
 
are
 
essential
 
to
 
provide
 
the
 
necessary
 
information
 
to
 
inform
 
any
 
projects-
 
repairs
 
or
 
renovations
 
to
 
GMMS.
 
 

Page 12 · open in PDF

Page 13 · open in PDF

Our Vision
We are pursuing a much needed 
expansion and renovation of the Granby 
Public Library to better serve our 
community for decades to come.
Our Approach
While we are pursuing grants and a 
municipal bond to fund the core construction, 
community donations will ensure the space 
is welcoming, well-equipped, and truly 
reflective of Granby.
Fundraising: Overview

Page 14 · open in PDF

Cabinet Members
Lauren Charamut: Chair/Project Manager
Lynn Guelzow: Vice Chair, GLB, Friends
Judy Guarco: GLB Chairman, Friends
Stacey Konopaske: Friends Treasurer
Brynne Geiselman: GLA
Advisors
Catherine Watso: GLB
Amber Wyzik: Director of Library Services
Campaign Cabinet & Advisors

Page 15 · open in PDF

The cabinet reviewed proposals from three agencies for this capital campaign:
We held meetings with top two agencies to further narrow down our selection. 
3DH Labs was selected after negotiations.
● Cervitude
● 3DH Labs
● Aperio
Fundraising: Agency Selection

Page 16 · open in PDF

On Boarding
Jan – March
3DH Project Onboarding, 
Stakeholder Engagement, 
Resident Interviews, 1-Pager & 
FAQs, Community Insights 
Report
Campaign Messaging
March – April
Market Research & Analysis, 
Campaign Framework, Build 
Full Campaign Message
Microsite
April – May
Design and launch of the digital 
campaign hub for donor 
information and engagement.
Major Donor Strategy
May
Build Out Major Donor Strategy, 
Donor Recognition.
Volunteer Training
June
Mobilizing and equipping campaign 
ambassadors with necessary tools and 
messaging.
Quiet Phase
June – October
Major Donors focus: Strategic cultivation 
and solicitation.
Public Phase
October – Goal Met
All Donors: Broad community outreach 
and final drive to achieve total 
fundraising objective.
Strategic Campaign Timeline & Movement

Page 17 · open in PDF

Fundraising - Phase One
This initial fundraising phase allows us to demonstrate strong 
community support—which strengthens our grant and 
bond applications.

Page 18 · open in PDF

Public funding builds the structure.
Community Support helps 
bring it to life.

Page 19 · open in PDF

$2M
Private Support Goal
The campaign seeks to raise $2 million in private 
support- an amount confirmed as achievable through a 
recently completed feasibility study- in addition to bond 
and grant funds, helping to fund an overall $12 million
library expansion and renovation. 
Fundraising Goal: Private Support
Community Donations will Help Support:
● Furnishing & Shelving
● Quiet Study Rooms
● Sustainability or Accessibility Features
● Special Children’s Room Features
● Art Design & Welcoming Features

Page 20 · open in PDF

$2-3M
Grant Support Goal
The Library Director is actively pursuing grants 
which, along with the municipal bond, are expected 
to cover a significant portion of the total. 
To attract grant funding, we must first define the 
project—funders need to see exactly what they are 
supporting.
Fundraising Goal: Grants
Community Enhancement 
Community donations will ensure the 
final project is fully realized and 
enhanced.

Page 21 · open in PDF

Fundraising Goal: Grants
PROJECT OPTION 1
Municipal Bond: $7 Million
Possible Grants: $2 - 3 Million
Fundraising Goal $2 Million
Comprehensive Goal $12 Million
PROJECT OPTION 2
Municipal Bond: $4 Million
Possible Grants: $2 - 3 Million
Fundraising Goal $2 Million
Comprehensive Goal $7 Million

Page 22 · open in PDF

$12 Million ($7 million bond & grants/fundraising)
Current Library 
Footprint

Page 23 · open in PDF

$7 Million ($4 million bond & grants/fundraising)
Current Library Footprint

Page 24 · open in PDF

THE NEXTCHAPTER

Page 25 · open in PDF

Granby Education 
Foundation
GEF Teen Room
Committed $100,000 
if project moves forward
● Supports the creation of a dedicated Teen Space 
at the Library to meet the educational, social and 
creative needs of students in grades 6-12
• Provides a welcoming, age appropriate space 
• Includes flexible study areas, collaborative 
workspaces and empowering technology
• Promotes positive youth development through 
community involvement and leadership 
opportunities 

Page 26 · open in PDF

American Library 
Association
Libraries Transforming Communities
Pending: $20,000
● To increase the accessibility of facilities, 
services, and programs to better serve people 
with disabilities
• Future furniture & technology
• Support these soft costs

Page 27 · open in PDF

James M. Cox 
Foundation
Children’s Room
In Process: $250,000 - $500,000
● Letter of Inquiry: COMPLETE
● Initial Interview:  COMPLETE
● May 2026:  Pre-Application Review with Board
● June 2026: Complete proposals due
● October 31: Awardees notified

Page 28 · open in PDF

CT State 
Library
Construction Grant
Planning Stages: $2 Million
● Funds ½ of total project costs up to $2 million 
● Timeline:
• June 30: Letter of Intent due
• September 1: Completed proposals due
• November: Awardees notified
• Jan/Feb: State bond commission approval if library 
has local funding in place
• By 3 years after approval- library must have local funding
• By 18 months following bond commission approval- project must be initiated- signed with contractor
• By 5 years after issuance of grant- project must be completed- all payment requests submitted

Page 29 · open in PDF

PURA -
PEGPETIA
Educational Technology Initiative
Planning Stages: $25,000
● Increase computer workstation to meet state standards
Addition of 5 workstations to meet enhanced standard of 13
Addition of 12 workstation to meet exemplary standard of 20
currently we have 8 public computer workstations
● November: Proposals due
● June 2027: Awards announced

Page 30 · open in PDF

Organization Grant Project Amount Status
Granby Education Foundation GEF Teen Room $100,000
American Library Association Transforming Communities $20,000
James M. Cox Foundation Children’s Room $250,000 - $500,000
CT State Library Construction Grant $2,000,000
PURA – PEGPETIA Educational Technology $25,000
Grant Pipeline

Page 31 · open in PDF

Letters of Inquiry
● Peter Alfond
● Andrew Family Foundation
● Gladys Brooks Foundation
● Cheryl Chase & Stuart Bear Family Foundation
● Sandra and Arnold Chase Family Foundation
● Ensign Bickford (EBI) Foundation
● SBM Charitable Foundation
● Robert and Margaret Patricelli Family Foundations - Adult Services
Letters of Inquiry

Page 32 · open in PDF

Coming Soon
● NEAG Foundation (June)
● The Stocker Foundation (September)
● Travelers Foundation and Corporate Giving Program
● Winslow Family Foundation
● ARSL Sustainable & Resilient New England Libraries (February)
○ Association for Rural and Small Libraries
● AARP Community Challenge (March)
Coming Soon…

Page 33 · open in PDF

Questions?
Thank you for your commitment to Granby's Future.

Page 34 · open in PDF

2026 2027 2028 2029 2030 2031 2032 2033 2034
Existing Debt 1,731 1,234 1,198 1,136 1,098 1,065 1,034 998 514
New Debt 0 0 0 321 993 1,329 1,300 1,271 1,242
Feed Into CNEF 105 602 638 379 0 0 0 0 0
Use of CNEF 0 0 0 0 (255) (558) (498) (433) 0
Net Debt Service 1,836         1,836         1,836         1,836         1,836         1,836         1,836         1,836         1,756         
BONDING CAPACITY
$15M at 3.5%

Minutes: archived copy, SHA-256 cbb02fc0f52c…. Agenda: archived copy, SHA-256 a4367d5ba4ef…. Packet: archived copy, SHA-256 c57ae2d67860….