Towns / Simsbury / Zoning Commission / Sep 9, 2026
Zoning Commission, Sep 9, 2026
Simsbury Zoning Commission Hide agendas that already have minutesDocuments
| Type | Document | Pages | Open |
|---|---|---|---|
| minutesminutes | Zoning Commission Regular Meeting Minutes | 4 | PDF download · town site |
| agenda | Zoning Commission Regular Meeting | 1 | PDF download · town site |
| packetpacket | Zoning Commission Regular Meeting (packet) Not attached: this packet is 29 MB, too large to host here. Use the town site link. |
88 | town site |
Summary
Only a meeting packet is posted. Packets (the supporting documents) are archived and searchable but not summarized; open the PDF to read it.
Full text of the documents
View the minutes PDF on this page (Zoning Commission Regular Meeting Minutes)
Text of the minutes (Zoning Commission Regular Meeting Minutes, 4 pages)
Page 1 · open in PDF
Page 1 of 4 Zoning Commission 1 Regular Meeting 2 September 9, 2026 – 7:00 P.M. 3 Simsbury Town Hall – Main Meeting Room 4 933 Hopmeadow Street, Simsbury, CT 06070 5 6 MINUTES 7 8 I. CALL TO ORDER– Vice-Chair Leary called the meeting to order at 7:00 9 P.M. 10 11 Present: Vice Chair, Shannon Leary; Commission Members: Jackie 12 Battos, Kate Beal, Dagny Griswold, and Tucker Salls; Alternate 13 Commission Members: Stacie Espeso, Allen Bradford and Doug McKown; 14 Planning Director, George McGregor; and Assistant Town Planner, 15 Brittany MacGilpin. 16 17 Absent: Chair, Tony Braz. 18 19 Seating of Alternates: Commissioner Bradford was appointed as a 20 regular member for tonight’s meeting. 21 22 II. APPROVAL OF MINUTES 23 24 July 20, 2026 25 26 MOTION: Commissioner Battos made a motion, seconded by 27 Commissioner Bradford, to approve the Minutes of July 20, 2026, Regular 28 Meeting as written. Commissioner Beal abstained. The motion carried (5-29 0-1). 30 31 July 27, 2026 32 33 MOTION: Commissioner Battos made a motion, seconded by 34 Commissioner Bradford, to approve the Minutes of July 27, 2026, Regular 35 Meeting as written. The motion carried (6-0). 36
Page 2 · open in PDF
Page 2 of 4 37 I. PUBLIC HEARINGS and ACTION ON APPLICATIONS 38 39 ZC #26-21, An application of Simsbury Fire District, owner, Matthew 40 Pearce, applicant, for a special exception pursuant to Section 3.4 of the 41 Simsbury Zoning Regulations to construct a ± 1400 sq.ft. fire training 42 building at 251 Hopmeadow Street (Assessor’s Map Block Lot F16 116 43 003C) Simsbury, CT 06070, Zone R-40. 44 Assistant Town Planner MacGilpin presented an overview of the project. 45 Staff of the Simsbury Fire District provided information and answered 46 commissioner questions. 47 48 MOTION: Commissioner Salls made a motion, seconded by Commissioner 49 Battos, to close the public hearing for ZC #26-21. The motion carried 50 unanimously (6-0-0). 51 52 MOTION: Commissioner Beal made a motion, seconded by Commissioner 53 Battos, that the Zoning Commission approves ZC #26-21, 251 Hopmeadow 54 Street, Simsbury Fire District, owner, Matthew Pearce, applicant, for a 55 special exception pursuant to Section 3.4 of the Simsbury Zoning 56 Regulations to construct a ± 1400 sq.ft. fire training building at 251 57 Hopmeadow Street (Assessor’s Map Block Lot F16 116 003C) Simsbury, CT 58 06070, Zone R-40 and subject to the following conditions: 59 60 1. The project shall be developed in substantial conformance with the 61 application information for 251 Hopmeadow Street, dated 07-14-2026. 62 2. Any building and zoning permits shall be obtained prior to the start of 63 the project. 64 65 The motion carried unanimously (6-0-0). 66 67 ZC #26-18, An application of Dorset Crossing LLC, Owner, Dwight 68 Merriam, Agent, pursuant to Section 8 of the Zoning Regulations for a zone 69 change and amendment to the Master Development Plan to allow a car 70 wash facility at 10 Dorset Crossing (Assessor’s Map Block Lot I04 403 13C-71 F), Planned Area Development (PAD) Zone. 72 ZC #26-19, An application of Dorset Crossing LLC, Owner, Dwight 73 Merriam, Agent, for a site plan approval to develop a 7,275 sq. ft. car wash 74 facility at 10 Dorset Crossing (Assessor’s Map Block Lot I04 403 13C-F), 75 Planned Area Development (PAD) Zone. 76 77
Page 3 · open in PDF
Page 3 of 4 Planning Director McGregor explained the Planning Office received an 78 Intervenor Petition, dated September 3, 2026. Mr. McGregor provided an 79 overview of the legal process associated with the petition, which is required 80 to first be verified by the Zoning Commission for Applications ZC #26-18 81 and ZC #26-19. 82 83 The Intervenor was then provided an opportunity to discuss the 84 environmental impacts as outlined in the petition. Attorney Jane Warren 85 of McCarter & English, representing the intervenor, provided a 86 presentation to the Zoning Commission. 87 88 The applicant, represented by Attorney Dwight Merriam, FAICP, Esq, 89 provided a rebuttal to the Zoning Commission. 90 91 MOTION (ZC #26-18): Commissioner Salls, seconded by Commissioner 92 Battos, moved to reject the Verified Petition and Notice of Intervention 93 under Section 22a-19 of the Connecticut General Statutes. Section 22a-19 94 does not allow an Intervention Petition for a Zone Change application as 95 there is no conduct, activity, or development associated with the 96 application. The Site Plan is an appropriate application for Intervention. 97 98 The motion carried (5-1-0). 99 MOTION (ZC #26-19): Commissioner Salls, seconded by Commissioner 100 Bradford, moved to accept the Petitioner, Thomas Sirman, upon a finding 101 that he has met the minimum threshold for a Verified Petition and Notice 102 of Intervention under Section 22a-19 of the Connecticut General Statutes 103 and admits said Intervenor. 104 105 The Commission finds further that the environmental issues raised in the 106 Petition are generally under the jurisdiction of the Zoning Commission. 107 108 The motion carried (6-0). 109 110 The Commission asked follow-up questions and deliberated on the zone 111 change application. 112 113 MOTION: Commissioner Griswold, seconded by Commissioner Beal moved 114 to APPROVE Application ZC 26-18 of Dorset Crossing LLC, owner, 115 Dwight Merriam Esq., applicant, for a Zone Change to amend the Master 116 Development Plan at Dorset Crossing to include a Car Wash Facility at 10 117 Dorset Crossing, based on a finding that: 118
Page 4 · open in PDF
Page 4 of 4 119 1. The Master Plan for the Dorset Crossing development identifies this 120 subject parcel for “Mixed-Use Retail/Office” uses. An amendment 121 allowing a car wash facility to be developed in lieu of retail or office is 122 generally consistent and appropriate for the development. 123 2. The car wash use is consistent with the Plan of Conservation and 124 Development (POCD) which supports mixed-use development in this 125 location. The economic development policies found in Chapter 9 of the 126 POCD support new business development in Simsbury and in this area 127 of the Hopmeadow St. corridor. 128 129 The Approval is subject to the following conditions: 130 131 a. Zone Change/Master Plan Amendment shall be developed in 132 substantial conformance to the Dorset Crossing PAD Master 133 Development Plan dated April 30, 2026, REVISED June 26, 2026 134 135 b. The Zone Change/Master Plan is effective upon proper and 136 adequate posting of the legal notice of action and its corresponding 137 appeal period. 138 139 The motion carried (4-2). 140 141 MOTION: Commissioner Salls made a motion, seconded by Commissioner 142 Beal, to forward the Application ZC #26-19 to the September 23, 2026, 143 regularly scheduled Zoning Commission Meeting. The motion carried 144 unanimously (6-0-0). 145 146 III. ADJOURNMENT 147 148 MOTION: Commissioner Salls made a motion, seconded by Commissioner 149 Bradford, for the meeting to be adjourned. The motion carried unanimously 150 (6-0-0). 151 152 Vice-Chair Leary adjourned the meeting at 8:15 P.M. 153 154 Respectfully submitted, 155 156 Brittany MacGilpin 157 Assistant Town Planner 158
View the agenda PDF on this page (Zoning Commission Regular Meeting)
Text of the agenda (Zoning Commission Regular Meeting, 1 page)
Page 1 · open in PDF
Zoning Commission Agenda ZC AGENDA 9-9-26.PDF ZC 26-21 251 Hopmeadow St Fire District Special Exception ZC 26-21 251 HOPMEADOW STAFF REPORT.PDF ZC 26-21 251 HOPMEADOW ST APPLICATION AND SUBMITTED MATERIALS.PDF ZC 26-19 10 Dorset Crossing Car Wash Site Plan For additional materials from previous meetings please see: HTTPS://WWW.SIMSBURY- CT.GOV/AGENDACENTER/VIEWFILE/AGENDA/_07202026-1390?HTML=TRUE HTTPS://WWW.SIMSBURY- CT.GOV/AGENDACENTER/VIEWFILE/AGENDA/_08042026-1399?HTML=TRUE ZC 26-19 DORSET CROSSING CAR WASH MASTER PLAN CHANGE AND SITE PLAN STAFF MEMO 9-9-26 W ATTACH.PDF ZC 26-19 10 DORSET SITE DEVELOPMENT PLAN SET 8-31-26.PDF ZC 26-19 10 DORSET SPILL PREVENTION PLAN.PDF ZC 26-19 10 DORSET WATER POLLUTION AND MONITORING MEMO.PDF ZC 26-19 10 DORSET BOND ESTIMATE.PDF ZC 26-19 DORSET CROSSING AQUARION LETTER 8-28-26.PDF 1. Documents: 2. Documents: 3. Documents:
Text of the packet (Zoning Commission Regular Meeting (packet), 88 pages)
Page 1
Zoning Commission Agenda ZC AGENDA 9-9-26.PDF ZC 26-21 251 Hopmeadow St Fire District Special Exception ZC 26-21 251 HOPMEADOW STAFF REPORT.PDF ZC 26-21 251 HOPMEADOW ST APPLICATION AND SUBMITTED MATERIALS.PDF ZC 26-19 10 Dorset Crossing Car Wash Site Plan For additional materials from previous meetings please see: HTTPS://WWW.SIMSBURY- CT.GOV/AGENDACENTER/VIEWFILE/AGENDA/_07202026-1390?HTML=TRUE HTTPS://WWW.SIMSBURY- CT.GOV/AGENDACENTER/VIEWFILE/AGENDA/_08042026-1399?HTML=TRUE ZC 26-19 DORSET CROSSING CAR WASH MASTER PLAN CHANGE AND SITE PLAN STAFF MEMO 9-9-26 W ATTACH.PDF ZC 26-19 10 DORSET SITE DEVELOPMENT PLAN SET 8-31-26.PDF ZC 26-19 10 DORSET SPILL PREVENTION PLAN.PDF ZC 26-19 10 DORSET WATER POLLUTION AND MONITORING MEMO.PDF ZC 26-19 10 DORSET BOND ESTIMATE.PDF ZC 26-19 DORSET CROSSING AQUARION LETTER 8-28-26.PDF 1. Documents: 2. Documents: 3. Documents:
Page 2
Page 1 of 1 Zoning Commission Regular Meeting September 9, 2026, at 7:00 PM Simsbury Town Hall – Main Meeting Room Hopmeadow St., Simsbury CT, 06070 AGENDA I. CALL TO ORDER Seating of Alternates II. APPROVAL OF MINUTES July 20, 2026 Meeting July 27, 2026 Special Meeting III. PUBLIC HEARINGS and ACTION ON APPLICATIONS ZC #26-21, An application of Simsbury Fire District, owner, Matthew Pearce, applicant, for a special exception pursuant to Section 3.4 of the Simsbury Zoning Regulations to construct a ± 1400 sq.ft. fire training building at 251 Hopmeadow Street (Assessor’s Map Block Lot F16 116 003C) Simsbury, CT 06070, Zone R-40. IV. SITE PLAN REVIEW and ACTION ON APPLICATIONS ZC #26-18, An application of Dorset Crossing LLC, Owner, Dwight Merriam, Agent, pursuant to Section 8 of the Zoning Regulations for a zone change and amendment to the Master Development Plan to allow a car wash facility at 10 Dorset Crossing (Assessor’s Map Block Lot I04 403 13C-F), Planned Area Development (PAD) Zone. Note: The Public Hearing is closed for application ZC 26-18. ZC #26-19, An application of Dorset Crossing LLC, Owner, Dwight Merriam, Agent, for a site plan approval to develop a 7,275 sq. ft. car wash facility at 10 Dorset Crossing (Assessor’s Map Block Lot I04 403 13C-F), Planned Area Development (PAD) Zone. V. OTHER BUSINESS VI. ADJOURNMENT
Page 3
Marc S. Nelson, MPA George K. McGregor, AICP Town Manager Director To: Simsbury Zoning Commission From: Brittany MacGilpin, Assistant Town Planner Date: September 9, 2026 RE: ZC #26-21, 251 Hopmeadow Street (Simsbury Fire District) Simsbury Fire District, owner, Matthew Pearce, applicant, for a special exception pursuant to Section 3.4 of the Simsbury Zoning Regulations to construct a ± 1400 sq.ft. fire training building at 251 Hopmeadow Street (Assessor’s Map Block Lot F16 116 003C) Simsbury, CT 06070, Zone R- 40. STAFF REPORT MEMORANDUM Background Simsbury Fire District, Applicant and owner, has submitted a special exception application for the demolition of the existing fire training building and construction of a new building in the same vicinity, approximately 70-feet x 20-feet. Please see the proposed location of the structure on the map to the right. The 6.21-acre parcel currently has multiple buildings to support the training for members of the Simsbury Fire District. According to the application, due to the age of the existing training facility building and the economically unfeasible costs associated with remediation, the Fire District is proposing to demolish the building and replace it with a more modern, state-of-the-art training facility in its place.
Page 4
Action by the Inland Wetland and Watercourses Agency The application was received by the IWWA on June 16, 2026. After hearing the applicant present the project, the IWWA voted that the proposed activities were not likely to impact or affect wetlands or watercourses and is therefore a non-significant activity. It was officially approved at the next regularly scheduled meeting on July 7, 2026. The IWWA, acting as the Conservation Commission, requests that any invasive species on the property be removed to the greatest extent possible and that new landscaping that may occur utilize native plantings. Staff Analysis According to the Simsbury Zoning Regulations, Section 3, because the parcel is in a residential zone, “Municipal, State and Federal government facilities” require a special exception application. As mentioned, the larger proposed building will replace the existing building on site. See the picture of the current building below. The new building will be a slab on-grade foundation and the current foundation for the basement will be eliminated. Once the structure is complete, the existing asphalt will be removed and repaved. The applicant explains that the paving will largely mirror the current footprint. An architectural rendering of the proposed building is to the right.
Page 5
Staff finds that the specific considerations for special exceptions, as found in Section 12 of the Town of Simsbury Zoning Regulations, have been substantially met or satisfied. Those considerations include: Orderly Development—The use is permitted in residential zones with a special exception permit. Property Values—There is no indication that the special exception request would affect property values in any negative manner. Public Safety—There are no extraordinary public safety considerations. Traffic Considerations—There are no traffic considerations. Landscaping and Buffers—Landscaping and buffers have not been proposed by the applicant. Relationship to Utility Systems, Drainage Systems, and Impact on Community Facilities—There are no anticipated impacts to these systems or facilities. Draft Motion Moved, the Zoning Commission APPROVES ZC #26-21, 251 Hopmeadow Street, Simsbury Fire District, owner, Matthew Pearce, applicant, for a special exception pursuant to Section 3.4 of the Simsbury Zoning Regulations to construct a ± 1400 sq.ft. fire training building at 251 Hopmeadow Street (Assessor’s Map Block Lot F16 116 003C) Simsbury, CT 06070, Zone R-40 and subject to the following conditions: 1. The project shall be developed in substantial conformance with the application information for 251 Hopmeadow Street, dated 07-14-2026. 2. Any building and zoning permits shall be obtained prior to the start of the project. Or moved, (An alternative motion)
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18
Page 19
Page 20
Page 21
Page 22
Page 23
Page 24
Page 25
Marc S. Nelson, MPA George K. McGregor, AICP Town Manager Director PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT 933 Hopmeadow St. Tel. (860) 658-3245 Simsbury, CT 06070 gmcgregor@simsbury-ct.gov STAFF REPORT MEMORANDUM To: Simsbury Zoning Commission From: George K. McGregor, AICP Date: September 9, 2026 Subject: ZC 26-18, Dorset Crossing Zone Change/Master Plan ZC 26-19, 10 Dorset Crossing Car Wash Site Plan This Staff Memorandum provides an update on ZC 26-19, 10 Dorset Crossing Car Wash Site Plan. As the public hearing for the Master Plan/Zone Change application ZC 26-18 was closed on July 20, 2026, no additional updates on this application are offered. ZC #26-18, An application of Dorset Crossing LLC, Owner, Dwight Merriam, Agent, pursuant to Section 8 of the Zoning Regulations for a zone change and amendment to the Master Development Plan to allow a car wash facility at 10 Dorset Crossing (Assessor’s Map Block Lot I04 403 13C-F), Planned Area Development (PAD) Zone. ZC 26-19, An application of Dorset Crossing LLC, Owner, Dwight Merriam, Esq. Applicant, for a site plan approval to develop a 7,275 sq. ft. car wash facility at 10 Dorset Crossing (Assessor’s Map Block Lot I04 403 13C-F), Planned Area Development (PAD) Zone. Agency and Staff Review Update Planning Commission-On July 14, 2026, the Planning Commission forwarded a neutral referral on the application. This was reported to the Commission at the July 20th meeting during the public hearing. A separate memo reporting the deliberations was also provided to the Commission prior to July 20, 2026.
Page 26
2 Design Review Board- On July 20, 2026, the DRB submitted a positive referral to the Zoning Commission1. This was reported during the public hearing. Fire Marshal-The Fire Marshal requested widening of internal drive aisles, along with other options, for fire safety and access reasons. The Applicant submitted a Fire Access Circulation Plan dated July 14, 2026. There are no fire marshall-related outstanding issues. Planning Staff-Planning Staff requested additional information related to water service capacity from Aquarion; engineering wastewater reporting; industry-related standards for water recycling; lighting standards; wall sign information; hours of operation; and standard sheet information for site plan applications. The Applicant has provided additional information and submittals addressing all the above items including the Aquarion capacity to serve letter. We expect that a full sign package will be reviewed as a separate application later. Proposed hours of operation have been revised: Attended car wash: 7 AM to 7 PM Self-service car wash and vacuums: 5 AM to 11 PM Town Engineer-A wastewater management report was provided by the Applicant on July 14, 2026. The Applicant submitted a revised site plan set, a spill prevention plan, and an E&S Bond estimate. There are no outstanding issues from the Town Engineer. Town Police Department-No outstanding issues identified. Conservation Commission. The Zoning Commission referred the application to the Conservation Commission. The Conservation Commission reviewed the application on August 4, 2026, and August 18, 2026, and forwarded a neutral recommendation to the Zoning Commission. Discussion centered on water usage and potential impacts of a car wash on the aquifer. The Commission also generated several questions which the Applicant has responded to as part of their September 1, 2026, submission. A detailed summary report from the Commission is attached to this memorandum. Summary of Issues 1. Location. Much of the public discussion centered on whether a car wash was appropriate in an Aquifer Protection Zone. The Town has adopted Aquifer Protection Regulations which sets forth uses that are regulated by these standards and uses which are deemed to NOT be regulated. A car wash is not regulated as determined by the Town Planning Director acting as Agent for 1 Memo from DRB is attached.
Page 27
3 the APA. It is not regulated since the wastewater generated is tied directly to the Town sewer system. The regulation explicitly states that car washes are regulated “unless all waste waters from such activity are lawfully disposed on through a connection to a publicly owned treatments works.” Wastewater will go directly to WPCA. Questions arose regarding the storage of cleaning products and other car wash related products. All materials will be stored inside the facility and will not be located outside anywhere on the site. On July 14, 2026, the Applicant has also submitted for the record a statement from Simoniz USA confirming that no chemicals contain PFAS (polyfluoroalkyl substances). The letter states, “Simoniz USA, Inc. confirms that the ingredients used in the car wash products…do not list any PFAS on their SDSs (Safety Data Sheets) and we do not use any PFAS as intentionally added ingredients.” These materials and the storage of chemicals are also not regulated in the APA, according to DEEP, as they are part and parcel of the car wash facility. In response to a request from the Conservation Commission, the Applicant has submitted a Spill Prevention Plan, dated September 2026. This plan is required by DEEP and sets forth best practices for chemical spill management. In addition, the Applicant has submitted a summary document addressing mitigation and monitoring standards in Connecticut’s aquifers. 2. Aquarion Capacity. On August 28, 2026, the Applicant submitted a “Will Serve” letter from the Aquarion water company. The letter states, in relevant part, “this letter confirms the Aquarion Water Authority (Aquarion) has sufficient water supply to meet the estimated commercial demand for the proposed development.”2 The letter notes that the approval is based on the Applicant’s request for service of the car wash and its inclusion of water reclamation and that a revised request may be necessary in the future. Staff note that neither the zoning regulations nor its site plan requirements regulate water use by any maximum standard. 3. Exit Drip. Concerns were expressed over the potential environmental consequences of cars exiting the facility with “carry-out” water or “exit drip.” Neither the Town nor DEEP consider the exit drip as wastewater and therefore it does not have to go directly into the Town treatment works. It may be handled and processed as typical parking lot run-off is treated. In this case, the run-off is directed to a stormwater management detention facility where it is treated. The exit drip is expected to be de minimus as high intensity blowers are employed to dry vehicles before exit. 2 Letter from Aquarion Attached
Page 28
4 Decision-Making Procedure The Zoning Commission must act on ZC 26-18, the Master Plan/Zone Change, before taking any action on ZC 26-19, the Site Plan application. Draft Conditions of Approval for ZC 26-19. 1. The project shall be developed in substantial conformance with the Site Development Plan Set dated 8/31/2026, prepared by Yantic River Consultants. 2. The project shall be developed in substantial conformance with the Architectural Plans dated June 29, 2026, prepared by Q&M Architecture. 3. The project shall be developed in substantial conformance with the Spill Prevention and Control Plan dated September 2026. 4. Hours of Operation shall be limited to: a. Attended Car Wash 7 AM to 7 PM Monday-Sunday b. Self-service Car Wash 5 AM to 11 PM Monday-Sunday 5. Prior to the issuance of any building permit on site, the Applicant shall submit to the Town an Erosion and Sediment Control Bond in the amount of $20,000, and in a form acceptable to the Town. 6. Prior to the issuance of any building permit on site, the applicant shall submit to the Town a full mylar set of the approved site plan for Commission signature. 7. Prior to the issuance of a certificate of occupancy for the car wash, the applicant shall submit to the Town a complete “As-built” site plan set. Draft Motions Draft Motions will be prepared and provided under separate covers.
Page 29
Marc S. Nelson, MPA George K. McGregor, AICP
Town Manager Director
Planning and Community Development
www.simsbury-ct.gov
933 Hopmeadow Street, Simsbury CT, 06070 Mon. 8:30 – 7:00 Tel. (860) 658-3245
Tue. Wed. Thu. 8:30 – 4:30
Fri. 8:30 – 1:00
MEMORANDUM
FROM: Design Review Board
TO: Subject File
DATE: July 21, 2026
RE: ZC 26-19, An application of Dorset Crossing LLC, Owner, Dwight Merriam,
Esq. Applicant, for a site plan approval to develop a 7,275 sq. ft. car wash
facility at 10 Dorset Crossing (Assessor’s Map Block Lot I04 403 13C-F),
Planned Area Development (PAD) Zone.
At the Design Review Board Regular Meeting on July 20, 2026, DRB passed the following
motion:
MOVED, The Design Review Board submits a positive referral to the Zoning
Commission for ZC 26-19, An application of Dorset Crossing LLC, Owner, Dwight
Merriam, Esq. Applicant, for a site plan approval to develop a 7,275 sq. ft. car wash
facility at 10 Dorset Crossing (Assessor’s Map Block Lot I04 403 13C-F), Planned Area
Development (PAD) Zone. The referral is subject to the following conditions:
1. The project shall be developed in substantial conformance to the following plans:
a. Dorset Crossing PAD Master Development Plan dated April 30, 2026,
REVISED June 26, 2026.
b. Architectural plans prepared by QA&M Architecture dated June 29, 2026.
c. Landscaping plans prepared by Robert Schechinger sheet L1 revised June
27, 2026, sheet L2 revised June 29, 2026, and the associated Site Plant
Schedule.
2. Staff may approve minor changes to the approved plans.
The Design Review Board gave several recommendations including:
1. Incorporating colonial style into the freestanding canopy design to match the
architecture of the main building.
Motion Count: 4-0-1 Page 30
Marc S. Nelson, MPA George K. McGregor, AICP Town Manager Director PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT Telephone (860) 658-3245 Facsimile (860) 658-3206 An Equal Opportunity Employer www.simsbury-ct.gov 8:30 – 7:00 Monday 8:30 – 4:30 Tuesday through Thursday 8:30 – 1:00 Friday Conservation Commission Referral Letter to the Zoning Commission for ZC # 26-19, 10 Dorset Crossing On August 4, 2026, the Conservation Commission received a referral application from the Zoning Commission for the following applications: •ZC #26-18, An application of Dorset Crossing LLC, Owner, Dwight Merriam, Agent, pursuant to Section 8 of the Zoning Regulations for a zone change and amendment to the Master Development Plan to allow a car wash facility at 10 Dorset Crossing (Assessor’s Map Block Lot I04 403 13C-F), Planned Area Development (PAD) Zone. •ZC 26-19, An application of Dorset Crossing LLC, Owner, Dwight Merriam, Agent, for a site plan approval to develop a 7,275 sq. ft. car wash facility at 10 Dorset Crossing (Assessor’s Map Block Lot I04 403 13C-F), Planned Area Development (PAD) Zone. The Conservation Commission reviewed the application material, public comment and correspondence received for the record and provides a neutral recommendation to the Zoning Commission. Summary The Commission would first like to point out that information from the Town’s water supplier, Aquarion Water Company, regarding water supply and usage, is lacking. This information is important for the Commission to provide a thorough review, especially for an application that is in an environmentally sensitive area where high water usage and continuous chemical use is occurring in proximity to residential well water. The site of the car wash is proposed to be within an Aquifer Protection Area (APA). While the Commission acknowledges that the use is considered unregulated activity in an APA if it is directly connected to a publicly owned water treatment works, commissioners continue to have concerns about what the short- and long-term impacts are to the water supply from this type of operation. The Commission understands that there is a pending “will-serve” letter from Aquarion, and it is recommended that this application not be approved until that letter is submitted. Beyond the requested “will-serve” letter, the Commission raised other global questions as it relates to water availability townwide and development impacts on surrounding areas. While it may be challenging for the applicant to respond, as the information comes from Aquarion’s operation, providing this information with these types of land-use applications will allow
Page 31
2 commissions and the public to be fully aware of water-related impacts. These additional concerns are below. 1. Explaining the water source to be supplied to a project and whether the rate of water usage would impact the supply to neighboring well water. 2. Understanding the technical analysis that goes into determining the short and long-term impacts that a commercial operation has on a water supply. 3. How the health of residential well water is protected from commercial operations. 4. Determine whether the car wash operations will be regulated by our Town’s drought ordinance. 5. If there becomes an issue with surface water pollution, who is responsible for mitigating the issue and providing a new water supply for households? Also, is there a routine monitoring plan in place to continually check the health of the aquifer? Additional August 4th Meeting Discussion Points Below are further discussion points that the Conservation Commission would like to emphasize from the August 4th meeting. 1. Storm Water Discharge – Water runoff containing possible contaminants from the car wash operation was discussed. The applicant explained that storm water drainage infrastructure currently exists at the site and will be utilized for the proposed project. An underground water retention system exists where storm water is collected and stored. There are also two catch basins and a hydrodynamic separator that exists to catch and “treat” the water prior to it traveling further to the water system. The proposed project meets the guidelines for the State of CT 2024 Storm Water Quality Manual. The Conservation Commission is satisfied that the proposed storm water design meets the current guidelines for the site but acknowledges that the public still has concerns for this environmentally sensitive area. It may be helpful to understand how storm water discharge from this site compares to that from other parking lots in this location. 2. “Carry-off” Water Treatment- In response to resident concerns regarding the “carry- out” or residual drip water that comes off vehicles when exiting the car wash site, the applicant contacted CT DEEP for any regulations or best practices that exist regarding treatment of this type of water. It was explained that this type of water runoff has not been studied by CT DEEP and is considered an “unregulated” activity under the Aquifer Protection Act. The water would be treated similarly as “parking lot runoff water” entering the storm water system. It was also explained by the applicant that the percentage of the “carry-off” water from cars exiting the site is a small percentage of the overall discharge and will be properly filtered through the proposed storm water treatment infrastructure that was designed for the site. The Conservation Commission understands that “carry-off” water is not a regulated activity under the Aquifer Protection Act and believes the storm water and wastewater system is adequately designed to handle this type of runoff per the current regulations which focuses on dilution of any potential storm water discharge.
Page 32
3 3. Aquifer Protection, Disposal of Wastewater and Chemical Usage - Car washes are not a regulated activity under the Simsbury Aquifer Protection Agency if the processed wastewater will be lawfully disposed of through a direct connection to a publicly owned water treatment works. The applicant has submitted material explaining that this would be the case and the Town Engineering staff reviewed the application and is satisfied the applicant meets this requirement. The type of chemicals and how they would be stored on site were also discussed. Chemical usage on cars will be restricted to the indoor portion of the structure where the runoff enters the sewer system. Cars will receive a final rinse of fresh water before exiting the structure so chemical runoff will be minimal. Chemical drums will be stored in an equipment room with 2-8 drums stored at the site at a time. The Conservation Commission suggests the applicant label on the site plan area where chemicals are expected to be stored and, because of the type of chemicals to be used and stored on site, a robust secondary containment system should be installed with details on the site plan. Information in the form of a letter discussing the amount and type of chemicals to be stored should also be included as well as mitigation plans in case of an unexpected leak. Furthermore, an outline describing the storage container disposal plan should be provided. 4. Water Usage Information- The applicant has a request pending with Aquarion Water Company for a “will-serve” letter (letter of availability). Water consumption estimates of 32,000 gallons per day were submitted for Aquarion’s review, however, the applicant explained that this number did not include the reclamation/recycled water which is estimated to be 55%. Aquarion asked the applicant to resubmit with this factor in mind, which will bring down the estimated water usage data. As mentioned previously, the Conservation Commission recommends that the Zoning Commission receive an official report from Aquarion Water Company regarding capacity prior to deciding on the application, and has a review of the hydrology of the area on the net effect this operation would have on the local aquifer and wells. Notwithstanding the above, the car wash application addressed other environmental items that the Conservation Commission would like to commend, such as: 1) Visible isolation of the facility from the road; 2) Use of dark sky compliant lighting; 3) Use of native plants in the landscaping and a more integrated landscape plan with one recommendation- to remove the use of Pacific Brilliance Pin Oak, which is a West Coast tree and substitute it with a native species. The Conservation Commission would like to thank the Zoning Commission for the opportunity to review the application and provide input.
Page 33
Aquarion Water Authority • 600 Lindley Street • Bridgeport, CT 06606 aquarionwater.com 203.445.7310 phone 800.732.9678 ( toll free ) August 2 8 , 2026 Rodney Goldberg Diamond Sparkle Car Wash LLC 359 Lebanon Avenue Colchester, CT 06415 Re: Request for Water Service – 10 Dorset Crossing Drive , Simsbury, Connecticut Diamond Sparkle Car Wash Dear Mr . Goldberg, This letter confirms that Aquarion Water Authority ( Aquarion ) has sufficient water supply to meet the following estimated commercial water demand for the proposed development at the above referenced property. Average Day Demand: 10,600 gallons per day Maximum Day Demand: 21,200 gallons per day Aquarion is currently approving the estimated average day demand while the water reclamation system is in service. We will be developing an operating agreeme nt in case of reclamation system failure, which will include notifying Aquarion of failure. This commitment does not include irrigation, fire hydrant, or fire sprinkler demand s because no demand projections for irrigation, fire hydrant s , or fire sprinkler s were included in the application submitted to Aquarion. If you wish to include irrigation , fire hydrant , or fire sprinkler demands in your project, you will need to update you r application and resubmit your Will Serve Letter request. This service commitment is valid for 12 months from the date of issuance. If your proposed project is not ready for water service (intended usage) within 12 months of this letter, then Aquarion’s ability to serve your project will have to be re - evaluated. While t his letter serves as a service commitme nt, it is not an approval of how or when you can connect (tap) to our water main. You must complete the New Services P rocess, including obtaining add itional approvals that are required , payment of required fees, etc. If you have any questions regarding this letter , please feel fre e to contact me at 203.362.3067. If you have questions regarding the new services process and next steps required to connect (tap) to our system, please contact our New Services Team at newservices@aquarionwater.com . Very truly yours, Aquarion Water Authority Hannah P. Swearsky Planning Engineer cc: New Services, File Attachment: Will Serve Letter Application dated 6/3/2026
Page 34
Page 35
Page 36
Page 37
S
S
S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
WG
WG
WG
WG
WG
S
WG
GG
WG
S
W
S
WG
S
S
GG
S
?
EE
WG
SEE NOTE #3
LINE
PROPERTY
FORMER
2622
CL&P
2623
CL&P
234
CL&P
3572
CL&P
4362
SNET
235
CL&P
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
C
C
C
FLAG POLE
D
G
A
TE
GRAVEL DRIVE
CONC. WALK
CONC. WALK
connection (typ.)
access/roadway
Possible future
connection (typ.)
access/roadway
Possible future
Total 24 Apartments 3 Story
BUILDING #4
Mixed Use Retail/Medical Office
Total 15,000 Square Feet 1 Story
BUILDING #2 30
40
13A
Total 24 Apartments
3 Story
BUILDING #5
50
Total 24 Apartments 3 StoryBUILDING #6
70
Signal
Traffic
VE
DR
IVE
W
A
Y
DRIVE
SAX
TO
N
B
R
OOK
DR.
ROAD
C
IRCLE
K
N
O
L
LW
O
O
D
C
E
N
T
E
R
-
W
O
O
D
R
D
.
WILLARD
GORDON
ST.
ST.
ELY
LANE
Saxton
Hoskins
ROAD
WESCOTT
ROAD
Brook
R
IVE
R
S
T
A
T
E
O
F
C
O
N
N
E
C
T
IC
U
T
315
W
E
S
T
WE
K
IL
BO
U
R
N
HO
W
A
R
D
S
T
.
R
D
.
(I
NA
C
T
IV
E
)
HOSKINS
SIMSBURY
AIRPORT
TULLER
DR.
WOLC
O
TT
SIMSBURY PINES
L
AU
R
IE
-
J
O
E
W
AY
47.02
47.45
47.54
47.93
48.04
48.21
0.85
0.92
1.04
1.3
EGDIRBRETSAC GNISSORC
TESROD CROSSING
S
T
R
E
E
T
47.61
47.71
DATE DESCRIPTION
8/31/26 SITE PLAN SUBMISSION
PROFESSIONAL SEAL
SHEET
DATE
REVISED
4/30/26
8/31/26
OFCONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
1 9
REVISION SUMMARY
PREPARED FOR
SCALE: 1" = 40'
PROJECT NUMBER:
00222 - 001
40 0 40 80 120
DIAMOND SPARKLE CAR WASH LLC
359 LEBANON AVENUE
COLCHESTER, CT 06415
DORSET CROSSING LLC
30 DORSET CROSSING
SIMSBURY, CT 06070
SIMSBURY, CT
DORSET CROSSING PAD
LOT F - SITE DEVELOPMENT PLANS
PREPARED FOR
DIAMOND SPARKLE CAR WASH LLC, APPLICANT
TITLE SHEET
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)
DORSET CROSSING DRIVE
HO
P
M
E
ADO
W
S
T
R
EET
(C
T
R
OU
TE
10
&
202
)
MAP REFERENCES:
BUILDING #1
CAR WASH
TOTAL 7,275 SF±
1 STORY
LOT A
67 SPACES
LOT F
LOT H
148 SPACES
INDEX OF SHEETS
TITLE SHEET 01
LOT F - SITE DEVELOPMENT PLANS
SCALE: 1" = 1000'
APPLICANT OWNER
SCALE: 1" = 1000'
ZONING LOCATION MAP
SITE LOCATION MAP
DESCRIPTION SHEET NUMBER
DEVELOPMENT LAYOUT PLAN - LOT F 02
GRADING & DRAINAGE PLAN 03
UTILITY PLAN 04
EROSION & SEDIMENTATION CONTROL PLAN 05
LIGHTING PLAN 06
DETAILS 07 - 09
LANDSCAPE PLAN L.1
LANDSCAPE DETAILS & GENERAL NOTES L.2
DORSET CROSSING PAD
10 DORSET CROSSING (M/B/L I04/403/13C-F)
SIMSBURY, CONNECTICUT
LOT F
SITE
(HATCHED)
NDDB AREA
APA LIMIT
PAD
SITE
10
TOWN ROAD MAP OBTAINED FROM THE CONNECTICUT DEPARTMENT OF TRANSPORTATION DATABASE.5.
ADMINISTRATION (NOAA) OF THE US DEPARTMENT OF COMMERCE DATABASE.
ELEVATION DATA OBTAINED FROM MAP REFERENCE 1 AND NATIONAL OCEANIC AND ATMOSPHERIC4.
ORTHOIMAGERY SPRING 2025 FROM NEARMAP.3.
HESKETH & ASSOCIATES, INC.
DATE: 09-16-2011 AS REVISED THROUGH 10/10/11, SCALE: 1" = 40', SHEET UT-1, PREPARED BY F.A.
"UTILITY PLAN PREPARED FOR DORSET CROSSING, HOPMEADOW STREET, SIMSBURY, CONNECTICUT"2.
09-22-2023, SCALE: 1" = 100', PREPARED BY F.A. HESKETH & ASSOCIATES, INC.
DORSET CROSSING DRIVE, SIMSBURY, CONNECTICUT", DATE: 12-03-2021 AS REVISED THROUGH
"DORSET CROSSING PAD, MASTER DEVELOPMENT PLAN PREPARED FOR DORSET CROSSING, LLC,1.
15 SPACES
Page 38
S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
WG
S
S
GG
S
?
2622
CL&P
2623
CL&P
234
CL&P
3572
CL&P
4362
SNET
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
E
E
C
C
T
FLAG POLE
D
CONC. WALK
SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE: 1" = 20'
PROJECT NUMBER:
00222 - 001
20 0 20 40 60
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION
SHEET
DATE
REVISED
4/30/26
8/31/26
OF 2 9
REVISION SUMMARY
8/31/26 SITE PLAN SUBMISSION
DORSET CROSSING PAD
LOT F - SITE DEVELOPMENT PLANS
PREPARED FOR
DIAMOND SPARKLE CAR WASH LLC, APPLICANT
DEVELOPMENT LAYOUT PLAN
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)
LP
LP
L
P
L
P
LP
LP
L
P
LP
LP
LP
LP
LP
LP
L
P
VAC
VAC
VAC
VAC
H
O
P
M
E
A
D
O
W
S
T
R
E
E
T
(C
T
R
O
U
T
E
10 &
202)
DORSET CROSSING DRIVE
V
A
C
V
A
C
V
A
C
V
A
C
V
A
C
V
A
C
V
A
C
OFFICE
AUTOMATIC TUNNEL
TOUCHLESS
SELF 1
SELF 2
PLANNED AREA DEVELOPMENT (PAD)ZONE:
CAR WASHUSE:
50.6' SY
MATCH APPROVED
PARKING/DRIVE SETBACK
5'
21.8' R
Y
AND ACCESS PLAN HAS BEEN APPROVED.
PARKING SIDE AND REAR YARD SETBACKS MAY BE REDUCED TO 0 FEET WHERE A UNIFIED PARKING2.
APPROVED INFORMATION OBTAINED FROM MAP REFERENCE 1, SHEET MA-1.1.
ZONING NOTES:
10'
10'
10'
45'-0"
25'-4"
25'-4"
38'-0"
11'-4"
24'-0"
70'-0"
6'-0"
"
21
21'-11
10'-0"
45'-0" 30'-0"
26'-0"
19'-0"
15'-0"
11'-4"
14'-8"
22'-0"
2'-0"
6'-0"
COMPLIES< 40 FTUNKNOWN40 FTBLDG. HEIGHT
REDUCTION36,161 SF40,000 SFN/AIMP. COVERAGE
INCREASE7,275 SF7,000 SFN/ABLDG. COVERAGE
REDUCTION7,275 SF12,000 SFN/ABLDG. AREA
NO CHANGE5 FT5 FT10 FTREAR YARD[2]
NO CHANGE5 FT5 FT10 FTSIDE YARD[2]
NO CHANGE10 FT10 FT10 FTFRONT YARD
PARKING SETBACKS
COMPLIES21.8 FT±21.1 FT±20 FTREAR YARD
N/AN/AN/A10 FTACCESSORY
COMPLIES50.6 FT±9.0 FT±20 FTPRINCIPAL
SIDE YARD
COMPLIES30.6 FT±20 FTCANOPY
COMPLIES60.8 FT±20.0 FT±20 FTBUILDING
FRONT YARD
NO CHANGE460.7 FT±460.7 FT±100 FTLOT FRONTAGE
NO CHANGE47,419 SF (1.08 AC)47,419 SF (1.08 AC)10,000 SFLOT AREA
NOTESPROPOSEDAPPROVED[1]REQUIREDITEM
PARKING/DRIVE SETBACK
10'
10'
10'
10'
10'
10'
10'
10'
16'
16'
62.4' SY
60.8' F
Y
M
A
IN
B
U
IL
D
IN
G
A
B
C
D
E
F
G
H
I
J
LEGEND
K
L
Mixed Use Retail/Medical Office
Total 15,000 Square Feet
1 Story
BUILDING #2
CONNECTION (TYP.)
ACCESS/ROADWAY
POSSIBLE FUTURE
A
18'
18'
12'
A
A
A
A
20' A
A
18'
B
B
B
C
D
E
E
E
E
F
F
F
F
F
F
F
F
F
F
E
E
F
F
G
G
H
I
J
TRASH ENCLOSURE
STOP SIGN
HANDICAP PARKING SIGN
HANDICAP RAMP (8.33% MAX.)
CONCRETE SIDEWALK
CONCRETE CURB & WALK MONO.
EXT. CONCRETE CURB (START/END)
BIT. CAPE COD CURB (START/END)
STOP BAR (12" WHITE)
LANE STRIPING (4" WHITE)
PARKING PAINT STRIPING (4" WHITE)
BITUMINOUS CONCRETE DRIVE
K
L
E
X
IS
T
IN
G
D
R
IV
E
W
A
Y
AREA = 552 SF±
CANOPY LIMITS
PAY STATION
LIGHT FIXTURE (TYP. OF 13)
15' HIGH POLE MOUNTED
EXISTING LIGHT FIXTURE (TYP.)
HANDICAP PARKING MARKING
WALL PACK (FULL CUTOFF)
POLE MOUNTED LIGHT FIXTURE
HAYBALE
SILT FENCE
TELECOMMUNICATIONS
ELECTRIC
GAS SERVICE
WATER
SANITARY SEWER
CURTAIN/SLOPE/WALL DRAIN
ROOF LEADER
DRAINAGE PIPE
CONCRETE WALK & CURB MONO.
CONCRETE WALK
SAWCUT PAVEMENT
EDGE OF PAVEMENT W/ CURB
"
21
14'-8
4'-0"
DETAIL
DRAINAGE EASEMENT
EASEMENT
EASEMENT
FAVOR OF CL&P
EASEMENT IN
OF AQUARION
EASEMENT IN FAVOR
TOWN OF SIMSBURY
EASEMENT IN FAVOR OF
8'
8'
9'
9'
9'
A
A
5 S
P
A
C
E
S
(V
A
C
.)
4 SPACES (VAC.)
18'
COMPLIES1 SP (1 VAN)1 SP (1 VAN)151 SP / 1-25 SPDEVELOPMENT TOTAL
ACCESSIBLE PARKING
COMPLIES15 SPACES5 SPACESTOTAL
11 SPACESN/AN/AN/APATRONS / VACUUM
2 SPACES3 SPACES31 SP / EMP.CAR WASH
2 SPACES2 SPACES2722.5 SP / 500 SFOFFICE
PARKING SPACES
NOTESPROPOSEDREQUIREDUNITSTANDARDITEM
GENERAL SITE NOTES
ACCESSIBLITY REQUIREMENTS.
CONTRACTOR TO CONFIRM WITH LOCAL CODES AND BUILDING INSPECTOR FOR SPECIFIC HANDICAPPED10.
COMPACTION.
GRANULAR BACKFILL. REFER TO GEOTECHNICAL REPORT FOR TYPE OF FILL TO ACHIEVE DESIRED
CONTRACTOR SHALL COMPLETELY FILL ALL TRENCHES WITHIN 5 FEET OF PAVEMENT EDGES WITH9.
TO THE OWNER.
CONSTRUCTION BY THE CONTRACTOR, HIS SUBCONTRACTORS OR SUPPLIERS AT NO ADDITIONAL COST
CONTRACTOR SHALL REPAIR, RESURFACE, RECONSTRUCT OR REFURBISH ANY AREAS DAMAGED DURING8.
ASPHALT.
WITH FORM 819, TOWN OF SIMSBURY OR DOT STANDARDS WHERE NEW ASPHALT JOINS EXISTING
CONTRACTOR SHALL SEAL EDGE OF EXISTING ASPHALT PAVEMENT WITH TACK COAT IN ACCORDANCE7.
PROJECT LANDSCAPE ARCHITECT.
SEED SHALL BE APPLIED AT THE MINIMUM RATE RECOMMENDED BY THE MANUFACTURER OR THE
CONTRACTOR SHALL SUPPLY AND PLACE STRAW MULCH WHEREVER GRASS SEED HAS BEEN PLACED.6.
1" BELOW TOPS OF CURBS, WALKS, OR PAVEMENT ELEVATIONS WHERE TOPSOIL ABUTS THOSE AREAS.
OR AS DIRECTED BY THE PROJECT LANDSCAPE ARCHITECT. TOP OF TOPSOIL LAYER SHALL BE PLACED
OTHERWISE NOTED. ALL NEW SEEDED OR SODDED AREAS SHALL HAVE A TOPSOIL LAYER OF 4" MINIMUM
ALL DISTURBED AREAS SHALL BE SEEDED OR SODDED AFTER FINISH GRADING IS COMPLETED UNLESS5.
FEATURES AS NECESSARY.
CONTRACTOR SHALL PROVIDE SMOOTH TRANSITIONS FROM PROPOSED FEATURES TO EXISTING4.
REPRESENTATIVE IMMEDIATELY.
DISCREPANCIES BETWEEN THE PLANS AND ACTUAL FIELD CONDITIONS TO THE OWNER OR OWNER'S
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS AND SHALL REPORT ANY
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO THE START OF CONSTRUCTION.3.
OR OTHER LIMITS AS DEPICTED ON THE PLAN.
ALL DIMENSIONS ARE TO THE EDGE OF PAVEMENT, FACE OF CURBS, OUTSIDE FACE OF THE BUILDING2.
CONSTRUCTION FORM 819 AS APPLICABLE AND THE TOWN OF SIMSBURY STANDARD SPECIFICATIONS.
TRANSPORTATION STANDARD SPECIFICATIONS FOR ROADS, BRIDGES, FACILITIES AND INCIDENTAL
ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE STATE OF CONNECTICUT DEPARTMENT OF1.
30.6' F
Y
C
A
N
O
P
Y
63.0' F
Y
M
A
IN
B
U
IL
D
IN
G
18'
24'
15.5'
H
5'
10'
FF = 201.50
AREA = 7,275 SF±
CAR WASH
1 STORY
BUILDING #1
DESIGN BY OTHERS
MONUMENT SIGN
DIAMOND SPARKLE
ZONING TABLE LOT F
PARKING TABLE LOT F
PARKING SPACE REQUIREMENTS PER SECTION 10.2.4USE:
6 S
P
A
C
E
S
(2 V
A
C
. / 1 H
A
V
A
N
)
(TYP. OF 6)
MOUNT VACUUM
DUAL HEAD POST
24'
13'
21.33'
13'
5'
G
4'
ROOM WITH SECONDARY CONTAINMENT EQUIPMENT & STORAGE
5'
13'
13' A
20'
R
4' R
15' R
15'
R
2'
R
2'
R
2'
R
20'
2'
R
2'
R
2'
R
15'
R
80'
R
15' R
15'
R
5'R
44'
R
50'
R
32' R
2'
R
75'
R
1'
R
5'
10'
R
5'
10.67'
10' MIN. ALONG FRONTAGE
PARKING/DRIVE SETBACK
23'
24'
20'
75'±
G
G
IPage 39
S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
WG
S
S
GG
S
?
2622
CL&P
2623
CL&P
234
CL&P
3572
CL&P
4362
SNET
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
E
E
C
C
T
FLAG POLE
D
CONC. WALK
201.50
201.50
201.50
201.50
201.50
201.50 201.50
201.50
201.50
201.50
201.50
201.50
SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE: 1" = 20'
PROJECT NUMBER:
00222 - 001
20 0 20 40 60
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION
SHEET
DATE
REVISED
5/18/26
8/31/26
OF 3 9
REVISION SUMMARY
8/31/26 SITE PLAN SUBMISSION
DORSET CROSSING PAD
LOT F - SITE DEVELOPMENT PLANS
PREPARED FOR
DIAMOND SPARKLE CAR WASH LLC, APPLICANT
GRADING & DRAINAGE PLAN
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)
+201.50
+
201.50
+201.25
+
201.25
+200.60
+201.10
+201.20
+
201.50
+
201.85
+200.50
+
201.05
+201.20
+199.80
+
199.00
+200.70
+
200.75
+
201.20
+
201.25
+200.35
+200.15
+
201.05
+
200.40
+
200.65
+
199.20
+
200.80
+
200.80
+
200.80
+200.85
+
201.60
+
202.00
+
202.00
198 200
198
200
202
201
201
201
202
201
200
+
200.55
+
200.95
+
200.55
200
200
198
196
194
192
190
202
200
202
202
202
202
200
192 194
196
196
198
LP
L
P
L
P
LP
LP
L
P
LP
LP
LP
LP
LP
LP
L
P
H
O
P
M
E
A
D
O
W
S
T
R
E
E
T
(C
T
R
O
U
T
E
10 &
202)
DORSET CROSSING DRIVE
Mixed Use Retail/Medical Office
Total 15,000 Square Feet
1 Story
BUILDING #2
CONNECTION (TYP.)
ACCESS/ROADWAY
POSSIBLE FUTURE
DRAINAGE EASEMENT
EASEMENT
FAVOR OF CL&P
EASEMENT IN
OF AQUARION
EASEMENT IN FAVOR
TOWN OF SIMSBURY
EASEMENT IN FAVOR OF
FL = 193.65 (8")
TF = 202.94
EX. SMH
FL = 187.40 (8")
TF = 198.49
EX. SMH
250' - 8" P
V
C
@
0.025
FF = 201.50
CAR WASH
1 STORY
BUILDING #1
UTILITY STATEMENT
4455, IN ACCORDANCE WITH CBYD NOTIFICATION PROCEDURES PRIOR TO COMMENCING WORK.
AUTHORITIES PRIOR TO CONSTRUCTION. CONTRACTOR TO NOTIFY "CALL BEFORE YOU DIG" AT 1-800-922-
EXISTENCE OF ALL SUCH FEATURES MUST BE FIELD DETERMINED AND VERIFIED BY THE APPROPRIATE
IN NATURE. ADDITIONALLY, OTHER SUCH FEATURES MAY EXIST ON THE SITE. THE SIZE, LOCATION AND
IN THE AREA, EITHER IN-SERVICE OR ABANDONED. THESE LOCATIONS MUST BE CONSIDERED APPROXIMATE
THIS PLAN SET MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES COMPRISE ALL SUCH UTILITIES
GOVERNMENT AGENCIES, PAROLE TESTIMONY, FIELD SURVEY AND OTHER SOURCES. THE SURVEYOR AND
COMPILED, IN PART, FROM RECORD MAPPING SUPPLIED BY THE RESPECTED UTILITY COMPANIES OR
UNDERGROUND UTILITY, STRUCTURE AND FACILITY LOCATIONS DEPICTED AND NOTED HEREON HAVE BEEN
STUBS PER MAP REF. 2 (VIF)
EXISTING 6" FIRE & 4" DOMESTIC
EXISTING GAS VALVE (VIF)
T
FL(E) = 187.65 (EX.)
TF = 200.70 (NEW)
TF = 201.37 (EX.)
EX. SMH #F-200
FL(W) = 196.32 (EX.)
TF = 200.50 (NEW)
TF = 200.91 (EX.)
EX. CB-C #F-204
FL(S) = 190.88 (EX.)
TF = 201.05 (NEW)
TF = 201.97 (EX.)
EX. SMH #F-201
FL(N) = 190.74 (EX.)
FL(SW) = 191.19 (EX.)
FL(SE) = 190.70 (EX.)
FL(NE) = 196.03 (EX.)
TF = 201.20 (NEW)
TF = 201.88 (EX.)
EX. SMH #F-203
FL(E) = 192.12 (EX.)
FL(S) = 192.09 (EX.)
TF = 198.80 (NEW)
TF = 200.67 (EX.)
EX. CB-C #F-206
FL(E) = 193.80 (24")
FL(W) = 196.55 (12")
TF = 199.90
PR. DMH #F-103
@ 0.8%
132 LF - 12" HDPE
FL(W) = 193.80 (24")
FL(N) = 196.55 (8")
TF = 199.75
PR. DMH #F-104
FL = 197.90 (8")
TF = 200.90
PR. YD #F-206
@ 2.9%
49 LF - 8" HDPE
FL = 197.25 (8")
TF = 200.25
PR. YD #F-105
@ 2.5%
28 LF - 8" HDPE
@ 0.5%
40 LF - 8" HDPE
FL(SE) = 197.80 (NEW)
FL(W) = 197.60 (EX.)
FL(NE) = 197.79 (EX.)
TF = 202.01 (EX.)
EX. CB-C #F-300
FL(N) = 190.73 (EX.)
FL(S) = 190.76 (EX.)
TF = 201.10 (NEW)
TF = 202.01 (EX.)
CONTECH STC 900
EX. STS #F-202
GRADING NOTES
FLOW LINE ELEVATIONS GIVEN AT END OF PIPE SECTIONS.10.
ON THE PLANS.
SEE APPROPRIATE DETAILS TO DETERMINE SUBGRADE ELEVATIONS BELOW FINISH GRADE INDICATED9.
ALL PROPOSED SPOT ELEVATIONS ARE THE FINAL PAVEMENT AND FINAL GRADE ELEVATIONS.8.
AND CORRECT IF ANY, "BIRD BATH" CONDITIONS.
PROVIDE POSITIVE DRAINAGE WITHOUT PONDING. AFTER INSTALLATION, CONTRACTOR TO TEST FOR,7.
PARKING AREAS WILL BE DETERMINED AT THE TIME OF CONSTRUCTION.
NECESSITY FOR SUBDRAINS AND/OR REMOVAL OF ANY UNSUITABLE MATERIAL WITHIN THE PROPOSED
WEIGHT ROLLER TO DETERMINE LOCATIONS OF ANY POCKETS OF UNSUITABLE MATERIAL. THE
AFTER REMOVING PAVEMENT AND/OR STRIPPING TOPSOIL MATERIAL, PROOFROLL WITH A MEDIUM6.
GRANULAR MATERIAL IF WITHIN 5 FEET OF PAVEMENT OR CONCRETE.
TRENCHES FOR ALL STORM DRAIN LINES SHALL BE BACKFILLED COMPLETELY WITH ENGINEERED5.
CONSTRUCTION.
NOTIFY THE UTILITY COMPANY SO A REPRESENTATIVE IS PRESENT TO INSTRUCT AND OBSERVE DURING
COMPANIES. WHEN EXCAVATING IS AROUND OR OVER EXISTING UTILITIES, THE CONTRACTOR MUST
ON SITE. ALL VERIFICATIONS (LOCATION, SIZE AND DEPTH) SHALL BE MADE BY THE APPROPRIATE UTILITY
START, OR AS REQUIRED BY GOVERNING UTILITY COMPANY, TO VERIFY IF ANY UTILITIES ARE PRESENT
THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES 72 HOURS BEFORE CONSTRUCTION IS TO4.
AND/OR COMPANIES SO AS NOT TO CAUSE DAMAGE.
EXISTING UTILITY LINES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTORS
THE EXCAVATING CONTRACTOR SHALL TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND3.
REPRESENTATIVE IMMEDIATELY.
DISCREPANCIES BETWEEN THE PLANS AND ACTUAL FIELD CONDITIONS TO THE OWNER OR OWNER'S
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS AND SHALL REPORT ANY
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO THE START OF CONSTRUCTION.2.
BE PERFORMED IN ACCORDANCE WITH THE TOWN OF SIMSBURY STANDARD SPECIFICATIONS.
CONSTRUCTION FORM 819 AS APPLICABLE. WORK WITHIN THE DORSET CROSSING RIGHT-OF-WAY SHALL
TRANSPORTATION STANDARD SPECIFICATIONS FOR ROADS, BRIDGES, FACILITIES AND INCIDENTAL
ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE STATE OF CONNECTICUT DEPARTMENT OF1.
DRAINAGE
STORMWATER O & M
BOTTOM STONE = 192.90±
BOTTOM CHAMBERS = 193.65±
16 CHAMBERS (2 ROWS X 8 UNITS)
SUBSURFACE INFILTRATION SYSTEM
PROPOSED STORMTECH MC-3500
TOP CHAMBERS = 192.29±
BOTTOM CHAMBERS = 187.02±
48 MODULES (4 ROWS X 12 UNITS)
SYSTEM WITH DURA-SKRIM LINER
EXISTING 'RETAIN IT' DETENTION
RL FL = 199.80
RL FL = 199.80
LEADER @ 1.0% (TYP.)
235 LF PVC ROOF
FL(E) = 197.06
FL(W) = 197.01
TF = 201.86
EX. CB-C
FL(SE & NW) = 197.54
FL(N) = 199.23
TF = 202.17
EX. CB-C
FL = 196.13
TF = 199.22
EX. CB-C
FL(W) = 195.74
FL(N) = 195.76
TF = 198.99
EX. CB-C
FL(N) = 192.29
TF = 196.09
EX. CB-C
FL(N) = 192.11
FL(S) = 192.22
TF = 196.01
EX. CB-C
FL = 198.28
TF = 201.04
EX. CB-C
EASEMENT
FL = 197.35
TF = 200.50
48" SUMP W/ HOOD
PR. CB-CL #F-101
FL = 198.00
TF = 200.85
48" SUMP W/ HOOD
PR. CB-CL #F-301
E
X
IS
T
IN
G
D
R
IV
E
W
A
Y
LEADER @ 1.0% (TYP.)
165 LF PVC ROOF
FL = 194.15
6" INSERTA TEE
FL(N) = 196.50 (NEW)
FL(NE) = 191.61 (EX.)
FL(W) = 191.60 (EX.)
TF = 199.80 (NEW)
TF = 200.70 (EX.)
EX. CB-C #F-205@ 0.5%
29 LF - 12" HDPE
@ 1.5%
10 LF - 12" HDPE
FL = 196.40
TF = 199.20
48" SUMP W/ HOOD
PR. CB-C #F-102
FL(N & NE) = 196.25 (NEW)
FL(W) = 196.25 (EX.)
TF = 199.50 (NEW)
TF = 198.37 (EX.)
WITH PR. DMH #F-100
EX. CB-C TO BE REPLACED
ACCORDANCE WITH THE 2024 STORMWATER QUALITY MANUAL.
TREATMENT HAS BEEN DESIGN AND IMPLEMENTED TO THE MAXIMUM EXTENT ACHIEVABLE INF.
BEEN INSTALLED, AND NO OTHER PRETREATMENT BMP'S ARE FEASIBLE.
CONNECTED TO A DOWNSTREAM SYSTEM WHERE OTHER TREATMENT PRACTICES HAVE ALREADY
A CONTRIBUTING DRAINAGE AREA OF 0.16 ACRES (<0.25), IS IN AN OFFLINE CONFIGURATION, IS
CATCH BASIN #F-301 WILL BE INSTALLED WITH A DEEP SUMP (48") AND A HOOD. THE BASIN HASE.
BEEN INSTALLED, AND NO OTHER PRETREATMENT BMP'S ARE FEASIBLE.
CONNECTED TO A DOWNSTREAM SYSTEM WHERE OTHER TREATMENT PRACTICES HAVE ALREADY
HAVE CONTRIBUTING DRAINAGE AREAS OF <0.25, ARE IN AN OFFLINE CONFIGURATION, ARE
CATCH BASINS #F-101 & #F-102 WILL BE INSTALLED WITH A DEEP SUMP (48") AND A HOOD. THE BASINSD.
CALCULATED WQF RATE OF 1.0 CFS.
MAXIMUM WATER QUALITY FLOW (WQF) TREATMENT RATE OF 1.4 CFS, WHICH EXCEEDS THE
CONTECH STC 900 HYDRODYNAMIC SEPARATOR. THE EXISTING TREATMENT STRUCTURE HAS A
EXISTING 200 SERIES COLLECTION STRUCTURES WILL DISCHARGE THROUGH AN EXISTINGC.
INFILTRATE THE CALCULATED WATER QUALITY VOLUME (WQV) EQUIVALENT TO 1.3" OF RAINFALL.
TO A STORMTECH MC-3500 SUBSURFACE INFILTRATION SYSTEM SIZED TO FULLY RETAIN AND
CLEAN RUNOFF FROM THE ROOF AND ADJACENT LANDSCAPED RAIN GARDENS WILL DISCHARGEB.
ALL CATCH BASINS SHALL HAVE 24" (MIN.) SUMPS EXCEPT AS NOTED.A.
STORMWATER RUNOFF FROM ALL NEW IMPERVIOUS SURFACES WILL BE TREATED AS FOLLOWS:3.
DISCHARGING OFF-SITE AS COMPARED TO THE APPROVED PAD DEVELOPMENT.
THERE WILL BE NO NET INCREASE IN PEAK FLOW RATES FOR THE 1-YEAR THROUGH 100-YEAR STORM2.
SITE VIA CONNECTION TO THE EXISTING COLLECTION SYSTEMS ON SITE.
A SERIES OF ROOF LEADERS, YARD DRAINS, CATCH BASINS & DRAINAGE PIPING AND DISCHARGED OFF
STORMWATER RUNOFF FROM THE PROPOSED DEVELOPMENT OF LOT F WILL BE COLLECTED THROUGH2.
FURNISHING MATERIALS.
THE CONTRACTOR SHALL CONFIRM ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO ORDERING AND/OR
OF THE ORIGINAL DORSET CROSSING PAD MASTER DEVELOPMENT PLAN. SEE MAP REFERENCES 1 & 2.
THE DRAINAGE SYSTEM SERVING LOT F HAS BEEN PARTIALLY INSTALLED AS PART OF THE CONSTRUCTION1.
MANUFACTURER'S RECOMMENDATIONS.
STORMTECH MC-3500 UNITS TO BE INSPECTED AND MAINTAINED IN ACCORDANCE WITH THED.
AS REQUIRED.
PAVED SURFACES IN THE SPRING FOR CRACKING OR DETERIORATION. REPAIR AND/OR SEAL
REMOVE SAND, SALT AND OTHER DEBRIS FROM THE WINTER MAINTENANCE SEASON. INSPECT
ACCESS DRIVES, PARKING AREAS AND SIDEWALKS SHALL BE SWEPT ANNUALLY EACH SPRING TOC.
DIVERTS FLOW SHALL BE REMOVED AND DISPOSED OF IN AN APPROVED MANNER.
FOLIAGE CLEANUP AND A SECOND TIME DURING SPRING CLEANUP. ALL DEBRIS THAT OBSTRUCTS OR
INSPECT EACH VEGETATED/LANDSCAPED AREA TWICE ANNUALLY, ONCE IN THE FALL AS PART OFB.
AREAS OF VISIBLE LEAKAGE BELOW WATER LEVELS. REPAIR OR SEAL STRUCTURE AS REQUIRED.
IN AN APPROVED MANNER. INSPECT SUMP, WALLS, RISERS, AND PIPE PENETRATIONS FOR HOLES OR
FOLLOWING THE WINTER SEASON. REMOVE ALL COLLECTED SEDIMENT AND DEBRIS AND DISPOSE OF
INSPECT EACH CATCH BASIN AND STORMWATER TREATMENT STRUCTURE ANNUALLY IN THE SPRINGA.
THE FOLLOWING MAINTENANCE SHALL BE PERFORMED AND A MAINTENANCE LOG COMPLETED.2.
OWNER & PARTY RESPONSIBLE FOR OPERATION AND MAINTENANCE: DIAMOND SPARKLE CAR WASH, LLC1.
MANAGEMENT SYSTEMS FUNCTION AS DESIGNED.
THE FOLLOWING OPERATION & MAINTENANCE PLAN SHALL BE IMPLEMENTED TO ENSURE THAT STORMWATER
ROOM WITH SECONDARY CONTAINMENT EQUIPMENT & STORAGEPage 40
S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
WG
S
S
GG
S
?
2622
CL&P
2623
CL&P
234
CL&P
3572
CL&P
4362
SNET
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
E
E
C
C
T
FLAG POLE
D
CONC. WALK
SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE: 1" = 20'
PROJECT NUMBER:
00222 - 001
20 0 20 40 60
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION
SHEET
DATE
REVISED
5/18/26
8/31/26
OF 4 9
REVISION SUMMARY
8/31/26 SITE PLAN SUBMISSION
DORSET CROSSING PAD
LOT F - SITE DEVELOPMENT PLANS
PREPARED FOR
DIAMOND SPARKLE CAR WASH LLC, APPLICANT
UTILITY PLAN
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)
+201.50
+
201.50
+201.25
+
201.25
+200.60
+201.10
+201.20
+
201.50
+
201.85
+200.50
+
201.05
+201.20
+199.80
+
199.00
+200.70
+
200.75
+
201.20
+
201.25
+200.35
+200.15
+
201.05
+
200.40
+
200.65
+
199.20
+
200.80
+
200.80
+
200.80
+200.85
+
201.60
+
202.00
+
202.00
198 200
198
200
202
201
201
201
202
201
200
+
200.55
+
200.95
+
200.55
200
200
198
196
194
192
190
192 194
196
196
198
200
202
202
202
202
200
LP
L
P
L
P
LP
LP
L
P
LP
LP
LP
LP
LP
LP
L
P
H
O
P
M
E
A
D
O
W
S
T
R
E
E
T
(C
T
R
O
U
T
E
10 &
202)
DORSET CROSSING DRIVE
Mixed Use Retail/Medical Office
Total 15,000 Square Feet
1 Story
BUILDING #2
CONNECTION (TYP.)
ACCESS/ROADWAY
POSSIBLE FUTURE
DRAINAGE EASEMENT
EASEMENT
EASEMENT
FAVOR OF CL&P
EASEMENT IN
OF AQUARION
EASEMENT IN FAVOR
TOWN OF SIMSBURY
EASEMENT IN FAVOR OF
FL = 193.65 (8")
TF = 202.94
EX. SMH
FL = 187.40 (8")
TF = 198.49
EX. SMH
FF = 201.50
CAR WASH
1 STORY
BUILDING #1
ROOM
UTILITY
METER
ELECTRIC
METER
GAS
EXISTING TRANSFORMER
E
X
IS
T
IN
G
D
R
IV
E
W
A
Y
UTILITY STATEMENT
4455, IN ACCORDANCE WITH CBYD NOTIFICATION PROCEDURES PRIOR TO COMMENCING WORK.
AUTHORITIES PRIOR TO CONSTRUCTION. CONTRACTOR TO NOTIFY "CALL BEFORE YOU DIG" AT 1-800-922-
EXISTENCE OF ALL SUCH FEATURES MUST BE FIELD DETERMINED AND VERIFIED BY THE APPROPRIATE
IN NATURE. ADDITIONALLY, OTHER SUCH FEATURES MAY EXIST ON THE SITE. THE SIZE, LOCATION AND
IN THE AREA, EITHER IN-SERVICE OR ABANDONED. THESE LOCATIONS MUST BE CONSIDERED APPROXIMATE
THIS PLAN SET MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES COMPRISE ALL SUCH UTILITIES
GOVERNMENT AGENCIES, PAROLE TESTIMONY, FIELD SURVEY AND OTHER SOURCES. THE SURVEYOR AND
COMPILED, IN PART, FROM RECORD MAPPING SUPPLIED BY THE RESPECTED UTILITY COMPANIES OR
UNDERGROUND UTILITY, STRUCTURE AND FACILITY LOCATIONS DEPICTED AND NOTED HEREON HAVE BEEN
UTILITY NOTES
WATER NOTES
SANITARY NOTES
ELECTRIC & TELECOMMUNICATIONS
GAS
FOR CLARITY PIPES MAY NOT BE DRAWN TO SCALE OR EXACTLY LOCATED.5.
THE INFORMATION ON THE DRAWINGS.
FIELD VERIFIED. NOTIFICATION SHALL BE GIVEN TO THE OWNER IF THE FIELD VERIFICATION DIFFERS FROM
IS IN THE VICINITY OF EXISTING PIPING, THE LOCATION AND ELEVATION OF THE EXISTING PIPING SHALL BE
WHEN CONNECTIONS ARE TO BE MADE TO EXISTING PIPING AND STRUCTURES OR WHERE CONSTRUCTION4.
BE CONTACTED BY THE CONTRACTOR.
BEFORE WORKING WITH OR AROUND EXISTING UTILITIES, THE APPROPRIATE UTILITY COMPANY SHALL3.
THE CONTRACTOR, AT HIS EXPENSE WITH THE PERMISSION OF THE OWNER.
CONSTRUCTION WITHOUT UNDUE INTERRUPTION OF SERVICE MAY BE REMOVED AND REPLACED BY
UNLESS OTHERWISE INDICATED ON THE DRAWINGS. ANY PIPING WHICH CAN BE REMOVED DURING
LOCATE AND MAINTAIN IN SERVICE ALL EXISTING UTILITIES ENCOUNTERED DURING CONSTRUCTION
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE AND ORDER ALL NEW SERVICES,2.
SPECIFICATIONS AND DETAILS OF THE APPROPRIATE PUBLIC UTILITY COMPANY.
ALL UNDERGROUND UTILITIES MUST BE INSTALLED IN ACCORDANCE WITH THE STANDARDS,1.
CONNECTICUT NATURAL GAS.
NORTHWEST CORNER OF THE SITE. CONNECTION LOCATION AND SIZE TO BE REVIEWED AND APPROVED
THE NEW BUILDING SHALL BE SERVED BY A NEW GAS CONNECTION TO AN EXISTING STUB AT THE2.
THE CONTRACTOR PRIOR TO INSTALLING GAS SERVICES.
THE LOCATION, SIZE, AND DEPTH OF ALL CONNECTION POINTS SHALL BE VERIFIED IN THE FIELD BY1.
STUBS PER MAP REF. 2 (VIF)
EXISTING 6" FIRE & 4" DOMESTIC
EXISTING GAS VALVE (VIF)
8" CLDIP WATER MAIN
12" CLDIP WATER MAIN
FL (CALC) = 190.7± (VIF)
LATERAL PER MAP REF. 2.
EXISTING 6" PVC SANITARY SERVICE
T
FL (CALC) = 191.2± (VIF)
STUB PER MAP REF. 2.
EXISTING 6" PVC SANITARY
6" FL = 198.0±
6" FL = 198.0±
6" FL = 198.0±
6" FL = 198.0±
ELECTRIC & TELECOMM SERVICE
GAS SERVICE
@ 0.070 FT/FT
43 LF - 8"Ø PVC (SDR35)
@ 0.083 FT/FT
26 LF - 8"Ø PVC (SDR35)
FL(OUT) = 194.20
FL(IN) = 194.30
TF = 201.20
SMH #1
FL(OUT) = 197.00
FL(IN) = 197.10
TF = 201.45
SMH #2
FL(OUT) = 197.65
FL(IN) = 197.85
TF = 201.45
SMH #3
DESIGN BY OTHERS
WATER RECOVERY SYSTEM
FL = 185.09 (8")
TF = 197.39
EX. SMH
FL = 184.11 (8")
TF = 196.63
EX. SMH
TF = 193.81
EX. SMH
REMOVED OR ABANDONED
WATER PIPE STUBS TO BE
EXISTING FIRE AND DOMESTIC
250' - 8" P
V
C
@
0.025
SIZE TO BE CONFIRMED BY MEP
1.5" - 2" DOMESTIC WATER SERVICE
PIT WITH 1.5" METER
AQUARION APPROVED METER
CUT & CAP EX. 6" FIRE STUB
WITH SECONDARY CONTAINMENT
EQUIPMENT & STORAGE ROOM
TOWN OF SIMSBURY.
COMPANY OF CONNECTICUT RULES AND REGULATIONS DATED JULY 31, 2024, AS AMENDED AND THE
ALL MATERIALS AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE AQUARION WATER7.
(SDR 26) PIPE WITH GASKETED, COMPRESSION-TYPE JOINTS WITHIN 10 FEET OF THE WATER LINE.
CONSTRUCTED OF WATER WORKS GRADE DUCTILE IRON PIPE WITH MECHANICAL JOINTS OR PVC
SANITARY SEWER LINES. IF 18 INCHES OF CLEARANCE IS NOT PROVIDED THEN THE SEWER MUST BE
A MINIMUM OF 18 INCHES OF VERTICAL CLEARANCE SHALL BE PROVIDED BETWEEN NEW WATER AND6.
ALL NEW WATER LINES SHALL HAVE A MINIMUM OF 54" OF COVER.5.
PIPE SHALL CONFORM TO ASTM STANDARD SPECIFICATIONS FOR LAKE COPPER B4-27.
METER PIT AT THE NORTHWEST CORNER OF THE SITE TO THE UTILITY ROOM IN THE NEW BUILDING.
A NEW 1.5" - 2"Ø COPPER TYPE "K" DOMESTIC WATER SERVICE SHALL BE INSTALLED FROM THE NEW4.
INSTALLED AS REQUIRED.
LINE AND CONNECTED TO THE EXISTING WATER SERVICE STUB. REDUCER FITTING SHALL BE
A NEW AQUARION APPROVED WATER METER PIT SHALL BE INSTALLED AT THE NORTHWEST PROPERTY3.
THE PROPERTY LINE.
CONFORMING TO AWWA C151. THE EXISTING FIRE SERVICE STUB SHALL BE CUT AND CAPPED AT
THE SITE TO THE SPRINKLER ROOM IN THE NEW BUILDING. PIPE SHALL CONFORM TO CLASS 52
SERVICE SHALL BE INSTALLED FROM THE EXISTING SERVICE STUB AT THE NORTHWEST CORNER OF
FIRE/SPRINKLER SERVICES FOR THE CAR WASH ARE NOT REQUIRED. IF REQUIRED THE NEW FIRE2.
THE CONTRACTOR PRIOR TO ORDERING, FURNISHING, OR INSTALLING WATER SERVICES.
THE LOCATION, SIZE, AND DEPTH OF ALL CONNECTION POINTS SHALL BE VERIFIED IN THE FIELD BY1.
BY THE PROJECT MEP OR ELECTRICAL CONTRACTOR.
CONDUIT LOCATIONS AND SIZES FOR EXTERIOR FIXTURES ARE NOT SHOWN AND ARE TO BE PROVIDED2.
FINAL CONNECTION LOCATION SUBJECT TO REVIEW AND APPROVAL BY EVERSOURCE.
NEW BUILDING BY A CONNECTION TO THE EXISTING TRANSFORMER ON THE WESTERLY PROPERTY LINE.
NEW ELECTRIC & TELECOMMUNICATIONS SERVICES SHALL BE PROVIDED TO THE UTILITY ROOM IN THE1.
AUGUST 28, 2026.
AVERAGE AND MAX. DAILY DEMANDS APPROVED BY AQUARION WATER IN A WILL SERVE LETTER DATEDD.
CALCULATED MAX. DAY DEMAND = 21,200 GPDC.
CALCULATED ADAWF = 10,600 GPDB.
WASH BAY, ONE INBAY AUTOMATIC, AND TWO SELF SERVE BAYS WITH RECYCLING RATE OF 58%.
AVERAGE DAILY FLOW CALCULATED BY TRIDENT WASH SYSTEMS BASED ON USE OF ONE CONVEYORIZEDA.
SANITARY SEWER FLOW CALCULATIONS:5.
POLLUTION CONTROL AUTHORITY RULES AND REGULATIONS.
ALL MATERIALS AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE TOWN OF SIMSBURY WATER4.
THE DOWNSTREAM DIRECTION OF THE MAIN SHALL BE MADE.
SEWER MAIN IS REQUIRED, A SADDLE OR OTHER APPROVED CONNECTION METHOD AT AN ANGLE OF 45° IN
DIRECT CONNECTION TO THE EXISTING SEWER STUB SHALL BE MADE. IF DIRECT CONNECTION TO THE3.
PIPE SLOPE SHALL BE 2% AND THE MAXIMUM PIPE SLOPE SHALL BE 10%
CONFORM TO ASTM D2241 AND SHALL MEET THE DEFLECTION STANDARDS OF ASTM D3303. THE MINIMUM
AN EXISTING 6" STUB IN THE 8" PVC SEWER MAIN IN THE DRIVEWAY TO THE WEST. THE PIPE SHALL
THE NEW BUILDING WILL BE SERVED BY A 6"Ø PVC (SDR 35) SANITARY SEWER LATERAL CONNECTING TO2.
THE CONTRACTOR PRIOR TO ORDERING, FURNISHING, OR INSTALLING SEWER SERVICES.
THE LOCATION, SIZE, TYPE, AND DEPTH OF ALL CONNECTION POINTS SHALL BE VERIFIED IN THE FIELD BY1.
DOMESTIC SANITARY FLOW ONLY
6" FL = 196.5±Page 41
NOTES:
1. INSTALL PER MANUFACTURER
SPECIFICATIONS.
2. INSPECT PER EROSION CONTROL
NOTES OR AS DIRECTED.
3. REMOVE SEDIMENT WHEN BAG
IS HALF FULL AND DEPOSIT PER
EROSION CONTROL NOTES.
4. REPAIR OR REPLACE WITHIN 24
HOURS OF OBSERVED FAILURE.
S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
E
E
C
T
FLAG POLE
CONC. WALK
ANTI-TRACKING PAD DETAIL
SOIL STOCKPILE DETAIL
SECTIONELEVATION
SILT FENCE
INLET SEDIMENT
CONTROL DEVICE
TEMPORARY SEDIMENT TRAP (TST) SIZING
PLAN
TEMPORARY SEDIMENT TRAP
OUTLET SECTION
SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE: 1" = 20'
PROJECT NUMBER:
00222 - 001
20 0 20 40 60
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION
SHEET
DATE
REVISED
5/18/26
8/31/26
OF 5 9
REVISION SUMMARY
8/31/26 SITE PLAN SUBMISSION
DORSET CROSSING PAD
LOT F - SITE DEVELOPMENT PLANS
PREPARED FOR
DIAMOND SPARKLE CAR WASH LLC, APPLICANT
EROSION & SEDIMENTATION CONTROL PLAN
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)
38C
NRCS
38C
NRCS
38C
NRCS 34A
NRCS
34A
NRCS
34B
NRCS
198 200
198
200
202
201
201
201
202
201
200
200
DORSET CROSSING DRIVE
SEE PLAN FOR WIDTH
NOT TO SCALE
COMPACTED SUBGRADE
50'-0" MIN. LENGTH
ROAD
6" CTDOT 2" STONE
FOR LOW SOIL BEARING CAPACITY
USE MIRAFLEX 600X OR EQUAL
2 MAX
3
NOT TO SCALE
MATERIAL STOCKPILE
FLOW
(TYP.)
STOCKPILE (TYP.)
OF MATERIAL
AROUND PERIMETER
SYSTEM PLACED
EROSION CONTROL
NOT TO SCALE
FLOW
3'-0" M IN.
NOTES:
1. INSTALL SILT FENCE & WOOD STAKES AS RECOMMENDED BY MANUFACTURER.
2. SILT FENCE SUBJECT TO HEAVY LOADS SHALL BE REINFORCED WITH FARM FENCING & STEEL
POSTS (0.5 # STEEL/L.F.). THE MINIMUM POST LENGTH SHALL BE 5'-0".
3. SILT FENCE FABRIC SHALL BE A PERVIOUS SHEET OF WOVEN PROPYLENE, NYLON, POLYESTER
OR POLYETHYLENE FILAMENTS AND SHALL BE CERTIFIED BY THE MANUFACTURER OR SUPPLIER.
2'-6" M
IN
.
12" M
IN
.
100°
10'-0" MAX.
6" M IN.
GRADE
FINISH
GRADE
FINISH
FENCE (SEE NOTE 2)
ATTACHED TO WIRE
SILT FENCE FABRIC
SELF-SUPPORTING
BACKFILL
RECOMPACTED
GROUND
FABRIC BELOW
EXTEND 6" OF
(MIN. LENGTH: 3' - 6')
1" x 2" WOOD STAKE
NOT TO SCALE
DUMPING STRAPS
STORM GRATE CURB OPENING
SILT SACK
LIFT STRAPS
CURB FILTER
PORTS
OUTFLOW
OPTIONAL
CT DOT #3 STONE
GEOTEXTILE FABRIC
MODIFIED RIPRAP
HAYBALES
DIVERTED RUNOFF
OUTLET
NOT TO SCALE
W
L
VARIES2'
1' M IN.
5' M AX.
1.5
1
1
2
1
2
2
1
WEIR
SOIL BERM
TST AREA (AC) REQUIRED WET VOL. DRY VOL.
(ACRE) VOL. (CY) (CY) (CY)
1 1 134 67 67
18" DRY VOLUM E
18" W ET VOLUM E
Mixed Use Retail/Medical Office
Total 15,000 Square Feet
1 Story
BUILDING #2
FF = 201.50
CAR WASH
1 STORY
BUILDING #1
8" CLDIP WATER MAIN
T
250' - 8" P
V
C
@
0.025
GENERAL CONSTRUCTION NOTES
SEQUENCE OF CONSTRUCTION
E & S CONTROL NARRATIVE
EROSION & SEDIMENT CONTROL PLAN
E & S CONTROL NOTES
INSPECTION AND MAINTENANCE
SIMSBURY AND THE STATE OF CONNECTICUT.
THE CONTRACTOR SHALL CONFORM TO ALL REQUIREMENTS OF ALL LOCAL AGENCIES OF THE TOWN OF2.
TO BE PERFORMED.
THE CONTRACTOR IS REQUIRED TO OBTAIN ALL NECESSARY LOCAL AND STATE PERMITS FOR THE WORK1.
REMOVE E&S CONTROLS WHEN PERMANENT VEGETATIVE COVER IS ESTABLISHED.11.
FINISH GRADE, SPREAD TOPSOIL, SEED, AND COMPLETE PLANTING.10.
INSTALL BITUMINOUS CONCRETE & CURBING.9.
CONSTRUCT ACCESS DRIVES, PARKING AREAS & WALKS.8.
INSTALL UTILITIES AND STORM DRAINAGE.7.
INSTALL FOUNDATION & ERECT BUILDING.6.
EXCAVATE, PLACE FILL AND ROUGH GRADE SITE.5.
STRIP & STOCKPILE TOPSOIL. EXPORT EXCESS TOPSOIL AS REQUIRED.4.
ABANDON AND/OR REMOVE UTILITIES AS REQUIRED.3.
FOR FIELD CONDITIONS.
INSTALL EROSION CONTROL MEASURES AT THE LOCATIONS SHOWN ON THE PLANS OR AS REQUIRED2.
COORDINATE A MEETING WITH TOWN AND OWNER. RESPONSIBLE PARTIES TO BE IDENTIFIED.1.
CONSTRUCTION UNTIL DISTURBED AREAS ARE STABILIZED.
FEATURES, MINIMIZE SOIL DISTURBANCE, AND MAINTAIN E&S CONTROLS FOR THE DURATION OF
WITHIN THE DEVELOPMENT AREA. THE CONTRACTOR SHALL TAKE CARE TO PRESERVE SURROUNDING
THE TOPOGRAPHY CONSISTS OF GENTLY SLOPING TERRAIN, WITH SLOPES RANGING FROM 2% TO 5%2.
MEASURES SHALL BE EMPLOYED AS REQUIRED, SUCH AS COVERING STOCKPILES OR APPLYING WATER.
TO WIND-BLOWN EROSION. LONG-TERM EXPOSURE OF THESE SOILS SHALL BE AVOIDED. DUST-CONTROL
MODERATE SUSCEPTIBILITY TO SHEET AND RILL EROSION AND A MODERATE TO HIGH SUSCEPTIBILITY
MERRIMAC FINE SANDY LOAM TO THE EAST. USDA IDENTIFIES THE SOILS AS HAVING A LOW TO
PER USDA NRCS SOIL MAPPING, THE SITE CONSISTS OF HINCKLEY LOAMY SAND TO THE WEST AND1.
CONCERNS & ISSUES SHALL BE NOTED:
DEPICTED ON THIS SHEET SHALL BE FOLLOWED. IN ADDITION THE FOLLOWING SITE SPECIFIC E&S CONTROL
THE EROSION & SEDIMENTATION CONTROL NOTES, INSPECTION REQUIREMENTS, PLANS, AND DETAILS
ARE COMPLETED.
STABILIZATION OF THE SITE WILL OCCUR IN SEQUENCE AS THE BUILDING AND SURROUNDING IMPROVEMENTS
SEDIMENTATION. PHASING OF MASS EARTH WORK IS NOT REASONABLE DUE TO THE LIMITED SIZE OF THE SITE.
MINIMIZES THE AREA, LIMIT AND TIME SOILS ARE EXPOSED TO RAIN AND WIND AND SUBJECT TO EROSION &
PART OF THE WORK, INCLUDING CONNECTION TO THE EXISTING PAVED DRIVEWAY TO THE WEST. THE PLAN
THE EXISTING PARCEL IS APPROXIMATELY 1.08 ACRE. APPROXIMATELY 1.1 ACRES WILL BE DISTURBED AS
IMPROVEMENTS. THE GENERAL SCOPE OF WORK IS DESCRIBED ABOVE IN THE CONSTRUCTION SEQUENCE.
THE PROPOSED PROJECT CONSISTS OF THE CONSTRUCTION OF A CAR WASH FACILITY AND ASSOCIATED SITE
AND SWALES SHALL BE MAINTAINED TO CONTROL RUNOFF AND PREVENT SEDIMENT DISCHARGE.
PUBLIC ROW AND INFILTRATION SHALL BE MAINTAINED. AT ALL TIMES DURING CONSTRUCTION, THE TST'S
DIRECTED TO THE TST'S. CONSTRUCTION WASTEWATERS SHALL NOT DISCHARGE DIRECTLY TO THE
DURING SITE CONSTRUCTION. ALL DEWATERING DISCHARGE AND CONSTRUCTION RUNOFF SHALL BE
TEMPORARY SILTATION TRAPS (TST) AND DIVERSION SWALES SHALL BE INSTALLED AS NECESSARY7.
DUST CONTROL MEASURES SHALL BE APPLIED THROUGHOUT THE CONSTRUCTION PERIOD. 6.
AN EROSION CONTROL SYSTEM SHALL BE INSTALLED AROUND ALL STOCKPILES OF SOIL.5.
BASINS ON SITE SHALL BE SURROUNDED WITH STRAW WADDLES OR BALES.
SACKS AS SHOWN ON THE PLAN THROUGHOUT THE CONSTRUCTION PERIOD. IF REQUIRED, NEW CATCH
ALL CATCH BASINS WITHIN THE PROJECT AREA SHALL BE PROTECTED WITH INLET CONTROL FILTER SILT4.
TRAFFIC. THE SURROUNDING ROAD SURFACES SHALL BE SWEPT DAILY OR AS REQUIRED.
TO PREVENT THE TRANSPORT OF SEDIMENTS OFF THE CONSTRUCTION SITE BY TRUCKS AND EQUIPMENT
AN ANTI-TRACKING APRON WILL BE INSTALLED AT ALL ENTRANCES TO THE CONSTRUCTION SITE IN ORDER3.
CONSTRUCTION WHEREVER POSSIBLE.
ALL EROSION AND CONTROL MEASURES SHALL BE INSTALLED AT THE PROJECT SITE PRIOR TO2.
EMERGENCY CONTACT: TO BE PROVIDED PRIOR TO ISSUANCE OF BUILDING PERMIT
PARTY RESPONSIBLE FOR E&S CONTROL PLAN: DIAMOND SPARKLE CAR WASH, LLC1.
100 LBS. PER ACRE.
TEMPORARY GRASS SEEDING, IF NECESSARY, SHALL BE PERENNIAL RYE GRASS APPLIED AT A RATE OF11.
ACRE OR AS RECOMMENDED BY THE SEED MANUFACTURER.
GRASS SEED MIXTURES SHALL BE TALL FESCUE BLEND APPLIED AT A RATE NO LESS THAN 100LBS PER10.
SPRING: APRIL 15 TO JUNE 15, FALL: AUGUST 15 TO SEPTEMBER 15
THE FOLLOWING DATES FOR SEEDING SHALL BE USED:9.
AREAS OUTSIDE OF IMPERVIOUS AREAS TO RECEIVE A MINIMUM 4" OF TOPSOIL.8.
IN CTDOT FORM 819 OR AS DIRECTED BY THE LANDSCAPE ARCHITECT.
ALL DISTURBED AREAS ARE TO BE RAKED, SEEDED AND FERTILIZED PER "TURF ESTABLISHMENT" SPEC.7.
THESE PLANS OR AS DIRECTED BY THE ENGINEER OR TOWN.
THE CONTRACTOR WILL BE RESPONSIBLE FOR IMPLEMENTING ALL E&S CONTROL DEVICES AS SHOWN ON6.
IS CONSISTENT WITH THE INTENT OF THE PLAN.
SEDIMENT REMOVED FROM ANY CONTROL STRUCTURES SHALL BE DISPOSED OF IN A MANNER WHICH5.
DURING THE CONSTRUCTION PERIOD AS NECESSARY OR REQUIRED BY THE ENGINEER OR THE TOWN.
EROSION CONTROL DEVICES SHALL BE MAINTAINED, REPLACED AND/OR ADDED BY THE CONTRACTOR4.
DATED 2023, AS AMENDED AND THE TOWN OF SIMSBURY REGULATIONS.
SPECIFICATIONS OF THE "CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL",
ALL E&S CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE STANDARDS AND3.
E&S CONTROL MEASURES SHALL BE INSTALLED PER THE PLANS, OR AS DIRECTED BY THE TOWN.2.
CONSTRUCTION IS ANTICIPATED TO START IN FALL 2026 AND BE COMPLETED IN 2027.1.
ALL STORMWATER STRUCTURES SHALL BE CLEANED AFTER REMOVAL OF E&S CONTROLS.6.
THE HEIGHT (MAX.)2 1STRAW BALES - REMOVE COLLECTED SEDIMENT @ iv.
SILT SACKS - CLEAN PER MANUFACTURER'S RECOMMENDATIONSiii.
THE HEIGHT (MAX.)2 1SILT FENCE - REMOVE COLLECTED SEDIMENT @ ii.
ANTI-TRACKING APRON - REPLENISH OR REPLACE STONE SA REQUIREDi.
TEMPORARY CONTROLS SHALL BE INSPECTED WEEKLY AND CLEANED:B.
INSPECT ROAD DAILY AND SWEEP/REMOVE TRACKED MATERIALS AS REQUIREDA.
ROUTINE INSPECTION AND MAINTENANCE SCHEDULE:5.
CAPACITY2 1DEWATERING BASINS - REMOVE COLLECTED SEDIMENT @ C.
DEPTH4 1SWALES - REMOVE COLLECTED SEDIMENT @ B.
DEPTH OF SUMP2 1CATCH BASINS - REMOVE COLLECTED SEDIMENT @ A.
GREATER THAN 0.1 INCHES AND CLEANED AS FOLLOWS:
ALL STORMWATER STRUCTURES SHALL BE INSPECTED WITHIN 24 HOURS AFTER RAINFALL EVENTS4.
AFTER RAINFALL EVENTS GREATER THAN 0.1 INCHES
ALL E&S CONTROLS SHALL BE INSPECTED, REPAIRED, AND CLEANED IF NECESSARY WITHIN 24 HOURS3.
CLEANED TO ENSURE THEY ARE IN PROPER WORKING ORDER.
CONDITIONS OR EFFECTS, ALL E&S CONTROLS SHALL BE INSPECTED, MAINTAINED, REPAIRED AND/OR
PRIOR TO A MAJOR STORM IN WHICH THE NOAA ISSUES WARNINGS OF FLOODING, SEVERE WEATHER2.
THE RESPONSIBLE PARTY SHALL PERFORM ROUTINE INSPECTIONS BASED ON THE FOLLOWING.1.
THE SITE IS STABILIZED.
RESPONSIBLE PARTY SHALL IMPLEMENT THE FOLLOWING THROUGHOUT THE CONSTRUCTION PERIOD UNTIL
REGULAR INSPECTION AND MAINTENANCE IS CRITICAL FOR THE EFFECTIVENESS OF E&S CONTROLS. THE
SWEPT AS REQUIRED
ROADWAY TO BE
APRON
ANTI-TRACKING
WET VOLUME = 67 CY
DRY VOLUME = 67 CY
TST #1
STOCKPILE
TOPSOIL
BOUNDARIES OR AS SHOWN (TYP.)
NORTH, EAST & SOUTH PROPERTY
SILT FENCE TO BE INSTALLED ALONG
DIVERSION SWALE TO WEST
WALL OF EX. CATCH BASIN
DISCHARGE INTO ORIFICE IN NORTH
STONE & RIPRAP WEIR FROM TST TO
ADJACENT TO SITE (TYP.)
IN EXISTING CATCH BASINS
DEVICE TO BE INSTALLED
INLET SEDIMENT CONTROL
PROTECTED DURING CONST.
DETENTION AREA TO BE
EXISTING UNDERGROUND
IN ALL PROP. BASINS (TYP.)
DEVICE TO BE INSTALLED
INLET SEDIMENT CONTROLPage 42
S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
WG
S
S
GG
S
?
2622
CL&P
2623
CL&P
2623S
CL&P
ELEV.=198.71
E 989669.19
N 891545.09
P.K. NAIL
CP#19068
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
E
E
C
C
T
FLAG POLE
ELEV.=204.26
E 989309.93
N 891321.88
REBAR
CP#173
D
CONC. WALK
SET
MON.'S
SET
MON.
SET
MON.
SET
MON.
SET
MON.
SET
MON.
connection (typ.)
access/roadway
Possible future
connection (typ.)
access/roadway
Possible future
Mixed Use Retail/Medical Office
Total 15,000 Square Feet 1 Story
BUILDING #2
13A
Signal
Traffic
NOTES:
LIGHT POLE & BASE
SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE: 1" = 20'
PROJECT NUMBER:
00222 - 001
20 0 20 40 60
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION
SHEET
DATE
REVISED
5/15/26
8/31/26
OF 6 9
REVISION SUMMARY
8/31/26 SITE PLAN SUBMISSION
DORSET CROSSING PAD
LOT F - SITE DEVELOPMENT PLANS
PREPARED FOR
DIAMOND SPARKLE CAR WASH LLC, APPLICANT
LIGHTING LAYOUT PLAN
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)
LP
L
P
L
P
LP
LP
L
P
LP
LP
LP
LP
LP
LP
L
P
DORSET CROSSING DRIVE
H
O
P
M
E
A
D
O
W
S
T
R
E
E
T
(C
T
R
O
U
T
E
10 &
202)
NOT TO SCALE
1. CLASS "F" CONCRETE CTDOT 816
2. REINFORCEMENT NOT SHOWN FOR
CLARITY. GRADE 60.
3. ANCHOR BOLTS HOT DIPPED GALVANIZED.
DIAMETER, PROJECTION EMBEDMENT,
LOCATION PER LIGHT POLE MANUAL.
4. EXTERIOR LAMP, BASE & POST SHALL BE
COORDINATED WITH TOWN, OWNER, &
ELECTRICAL CONTRACTOR
CONDUIT
2" DIA. PVC
GRADE
FINISH
1" CHAMFER
(TYP. OF 2)
2" DIA. PVC SWEEP
GROUND ROD
1" DIA. PVC FOR
(SEE NOTE 3)
ANCHOR BOLT
MANUFACTURER
PER LIGHT POLE
BOLT PATTERN AS
24" DIA.
24" Ø
6"42"
15' M
O
U
N
T
IN
G
H
E
IG
H
T
A
B
O
V
E
B
A
S
E
DISTRIBUTION AS SPECIFIED
LIGHT FIXTURE OR EQUAL
RAZAR 'RZRM-IV-24LED'
U.S. ARCHITECTURAL LIGHTING
LIGHTING STATEMENT
LIGHTING NOTES
LUMINAIRE SCHEDULE
T4HSS
T4HSS
T4HSS
T4HSS
T4HSS
T4HSS
T4HSS
0.1 fc
0.1 fc
0.1 fc
0.1 fc
0.1 fc
0.2 fc
0.2 fc
0.2 fc
0.2 fc
0.5 fc
0.5 fc
0.5 fc
0.5 fc
0.5 fc
1.0 fc
1.0 fc
1.0 fc
1.0 fc
1.0 fc
2.0 fc
2.0 fc
2.0 fc
2.0 fc
E
X
IS
T
IN
G
D
R
IV
E
W
A
Y
AREA = 7,275 SF±
CAR WASH
1 STORY
BUILDING #1
CANOPY
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
ISOLINE CONTOUR (TYP.)
ISOLINE VALUE (TYP.)
T4HSS
T4HSS
T4HSS
T4HSS
T4HSS
0.2 fc
T4HSS
INTERNAL SITE LIGHTING AT COMMON LOT LINES IS IN HARMONY WITH THE APPROVED PAD DEVELOPMENT.
A MAXIMUM ILLUMINATION VALUE OF 0.5 FC HAS BEEN MET AT THE DORSET CROSSING ROW (SOUTH).2.
PROPERTY LINES HAVE NOT BEEN CONSIDERED IN THE ANALYSIS.
BUILDING MOUNTED LIGHTING OR EXISTING POLE MOUNTED FIXTURES ALONG THE NORTH, WEST, AND SOUTH
OF 0.5 TO 5.0 FC FOR DRIVES, PARKING AREAS AND PEDESTRIAN WALKS SERVING THE BUILDING ENTRANCES.
SOCIETY. MINIMUM HORIZONTAL ILLUMINATION LEVELS OF 0.2 FC ARE PROPOSED WITH A TYPICAL RANGE
DEVELOPMENT AND GENERALLY MEETS THE RECOMMENDATIONS OF THE ILLUMINATING ENGINEERING
EXTERIOR LIGHTING HAS BEEN DESIGNED FOR A SUBURBAN COMMERCIAL USE WITHIN AN APPROVED PAD1.
5.0 fc
5.0 fc
5.0 fc
5.0 fc
5.0 fc
5.0 fc
5.0 fc
5.0 fc
5.0 fc
2.0 fc
1.0 fc
WP
WP
NOTESARRANGEMENTDESCRIPTIONLABELQUAN.SYMBOL
12' MOUNTING HEIGHT ABOVE FFSINGLEUSAL RZR-M-PLED-IV-24LED-700mA-30KT4HSS13
15' MOUNTING HEIGHT ABOVE BASESINGLESLIM17FA-FC-40W-3K-BZ-120WP0
WP
WP
S
E
E
N
O
T
E
4
S
E
E
N
O
T
E
4
S
E
E
N
O
T
E
4
S
E
E
N
O
T
E
4
PHOTOMETRIC PLAN.
CANOPY LIGHTS WILL BE DARKSKY APPROVED OR MOUNTED IN THE CEILING. NOT INCLUDED IN
SEE ARCHITECTURAL PLANS FOR BUILDING AND CANOPY MOUNTED LIGHTING. ALL BUILDING AND5.
OF DESIGN VALUES WHEN THE FACILITY IS CLOSED.
FOR SECURITY. LIGHTING SHALL HAVE REDUCED POWER OUTPUT AND ILLUMINATION LEVELS SET TO 25%
OR WITH TIMERS, PHOTOCELLS, OR MOTION SENSORS TO REDUCE LIGHTING TO THE MINIMUM NECESSARY
WHEN THE FACILITY IS CLOSED ALL NON-ESSENTIAL LIGHTING FIXTURES SHALL BE CONTROLLED MANUALLY4.
WALL PACK = 12' MOUNTING HEIGHTB.
POLE-MOUNTED = 15' FIXTURE HEIGHTA.
FIXTURE MOUNTING HEIGHTS:3.
REVISED PHOTOMETRIC PLAN.
ALTERNATE FIXTURES SHALL BE APPROVED BY THE OWNER AND TOWN WITH SUBMISSION OF A
ALL EXTERIOR FIXTURES SHALL BE SUPPLIED AS PROPOSED OR APPROVED EQUAL OR GREATER.2.
DARKSKY APPROVED FOR 3000K CCT AND WARMER.
OF LIGHT AND GLARE ON ADJACENT PROPERTIES AND ROADWAYS. THE SELECTED FIXTURES ARE
ALL SITE LIGHTING SHALL BE FULL CUT-OFF OF SHIELDED TYPE TO PREVENT UPWARD DISTRIBUTION1.Page 43
BITUMINOUS PAVEMENT
CURB (BCLC)
BITUMINOUS CONCRETE
SECTION
CONCRETE DUMPSTER & MAIL PAD
SECTION A-A
PLAN
CURB MONOLITHIC
CONCRETE SIDEWALK AND
NOT TO SCALE
CONCRETE SIDEWALK
PLAN
SECTION (TYPICAL) SECTION (@ DRIVEWAY)
SIDEWALK RAMP (TYPE 15) SIDEWALK RAMP (TYPE 16)
PARKING STALL DETAILS
STOP BAR
BE FINED MIN. $150
VIOLATORS WILL
REQUIRED
PERMIT
PARKING
HANDICAPPED
ACCESSIBLE
VAN
HANDICAPPED PARKING
STOP SIGN
STOP
NOT TO SCALE
2"
2"
CAPE COD CURB
EXTRUDED CONCRETE LIP CURB
& POST DETAIL
CHAINLINK FENCE
DUMPSTER PAD
CHAINLINK SWINGING GATE
DUMPSTER PAD
TRAFFIC ARROWS
5'-0"5'-0"5'-0"
SEE PAVEMENT
DETAIL
NOT TO SCALE
REQUIRED
TACK COAT AS
COMPACTED GRANULAR SUBGRADE
(COMPACTED)
8" PROCESSED GRAVEL
" LIFTS2 11
CONCRETE PLACED IN
3" CLASS 2 BITUMINOUS
NOT TO SCALE
1'-0"
9"3"
6"
1"TACK COAT
CURBING SHALL BE MACHINE EXTRUDED.1.
NOTES:
"/FT. MIN. SLOPE8 1
(TYP.)
6"
FABRIC
WELDED WIRE
6x6 - W1.4x W1.4
NOT TO SCALE
" RADIUS4 1
6" CONCRETE SLAB
GRAVEL BASE
6" PROCESSED
TRANSVERSE TO THE SLOPE OF THE PAD.
CONCRETE SURFACE SHALL BE BROOM FINISH2.
ALL CONCRETE TO BE 4,000 PSI MIN.1.
12" TYP.
NOT TO SCALE
A
A
" GROOVE4 1
1" RADIUS
6" CURB REVEAL
CURB SECTIONEVERY 15 FT
CONTROL JOINT
" GROOVE4 1
(TYP.)8 3DEPTH
TOOLED JOINT
JOINT MATERIAL EVERY 30'
" ASPHALTIC EXPANSION2 1
" STEEL DOWEL (TYP.)8 5
WIDTH AS SHOWN ON PLANS
8" M
IN.
6"
6"
" PER FT4 1
5" - 4000 PSI CONCRETE
MESH REINFORCEMENT
6 X 6 - W1.4X1.4 WIRE
AGGREGATE
5" PROCESSED
@ 15' MAX.
EXPANSION JOINT
1/4" PREFORMED
15' MAX.
PER PLAN
MATCH WIDTH
JOINT (TYP.)
TOOLED
WIDTH PER PLANS
1/4" RADIUS
3" MIN.
8"12"
4,000 PSI CONCRETE (CLASS 'F') MESH REINFORCEMENT
4 X 4 - W6.5 X W6.5 WIRE
PROCESSED AGGREGATE BASE
WIDTH PER PLANS
PROCESSED AGGREGATE BASE
1/4" RADIUS
MESH REINFORCEMENT
6 X 6 - W1.4 X W1.4 WIRE
5"8"
NOT TO SCALE
6" CURB
EDGE OF PAVEMENT
LANDING FLUSH W/
TRANS. CURB
1
4"/FT MAX
1"/FT MAX
1
4"/FT MAX CONCRETE
SIDEWALK
APPROACH
6" CURB
4'-0"
DETECTABLE WARNING TILE
TRANS. CURB
LANDSCAPED SHOULDER
NOT TO SCALE
CONCRETE CURB TRANSITION
6" CURB
AT BOTTOM OF RAMP GRADE BREAK
DETECTABLE WARNING TILE PLACED
1
4"/FT MAX
1"/FT MAXCONCRETE
SIDEWALK
APPROACH
6" CURB
4'
EDGE OF PAVEMENT
RAMP FLUSH W/
RAMP (6" MAX. CURB DROP)
NOT TO SCALE
STALL
STANDARD
EDGE OF PAVEMENT
PAINTED SUMBOL TO BE INTERNATIONAL SIGN OF ACCESSIBILITY2.
ALL STRIPING TO BE 4" WHITE1.
NOTES:
5'10'
15'
8'8'
16'
ACCESSIBLE STALL VAN ACCESSIBLE STALL
18'
9'
OR CURB (TYP.)
SIGN PLACED BEHIND WALK
HANDICAPPED ACCESSIBLE
18'
10'
STALL
VACUUM
NOT TO SCALE
WIDTH & LOCATION AS SHOWN
LENGTH AS SHOW N
12"
MARKING (TYP.)
4" DBL. YELLOW CENTERLINE
WHITE STOP BAR
NOT TO SCALE
60"
GRADE
ABOVE 24"
12"
PARKING STALL(S).
ACCESSIBLE DESIGNATED
ONLY INSTALLED AT VAN
"VAN ACCESSIBLE" SIGN1.
NOTES:
SILVER, REFLECTORIZED
LEGEND:
BLUE, REFLECTORIZED
BACKGROUND:
NOT TO SCALE
WITHIN DOT ROW.
METAL SIGN POST & MOUNTING
DRAWING TR-1208-02 FOR
SEE CONNDOT STANDARD3.
WITH BREAKAWAY
GALVANIZED STEEL POST
SECURE TO (1) TYPE A2.
SIGN #31-0552
PER CONNDOT STANDARDS
30" SIGN TO BE INSTALLED1.
NOTES:
"2 15
"CAPE COD" CURBING
BITUMINOUS CONCRETE
SURFACE TREATMENT
SEE PLANS FOR
"2 1123"
NOT TO SCALE
BARS(TYP.)
#3 REINFORCING
4,000 PSI
CONCRETE
FINISH COURSE
BINDER COURSE
SUBBASE
6"
1" R
6"
7"
4" TOPSOIL (MIN.)
6'-0"
10'-0" MAX SPACING
BLACK VINYL COATED
END & CORNER POST
VINYL COATED
LINE POST BLACK
VINYL COATED
TOP RAIL BLACK
NOT TO SCALE
PRIVACY SLATS
CHAIN LINK MESH WITH
BLACK VINYL COATED
10" DIA
1"-6"
3'-0"6"
LIGHT HALF HEAVY HALF
NOT TO SCALE
CONCRETE
TENSION WIRE END CLAMP
TENSION WIRE END CLAMP TOP HINGE
ORNAMENTAL TOPS
PLUNGER ROD
TRUSS RODS
CORNER ELBOW
TOP HINGE
BOTTOM HINGE
PLUG
STRAIGHT
ROD CATCH
PLUNGER
LOCK KEEPER GUIDE
FORK CATCH
STRETCHER BAR
HOOK BOLTS
LATCH FORK
LOCK KEEPER
6'-0"
NOT TO SCALE
NOTES:
1.LANE-USE ARROW MARKINGS SHALL BE WHITE
2.TURN ARROW DIRECTIONS SHALL BE PER THE PLAN
6'
5'
THROUGH LANE-USE ARROW
LANE-USE ARROW
TURN & THROUGH
ARROW
TURN LANE-USE
SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE: AS SHOWN
PROJECT NUMBER:
00222 - 001
1 0 1 2 3
DATE DESCRIPTION
8/31/26 SITE PLAN SUBMISSION
SHEET
DATE
REVISED
4/30/26
8/31/26
OF 7 9
REVISION SUMMARY
DORSET CROSSING PAD
LOT F - SITE DEVELOPMENT PLANS
PREPARED FOR
DIAMOND SPARKLE CAR WAS LLC, APPLICANT
DETAILS
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)
XPT ISLAND NOTE:
BY OWNER.
FINAL ISLAND DESIGN, EQUIPMENT LAYOUT, AND CONFIGURATION
DETAILS SHOWN FOR GENERAL CONFIGURATION PURPOSES ONLY.Page 44
STANDARD CATCH BASIN
TYPE "C", "CL" OR "CG"
TRENCHING & BACKFILLING YARD DRAIN
HOOD SECTIONCATCH BASIN SECTION
PRECAST STORM DRAIN MANHOLE
DRAIN
NOT TO SCALE
REDUCER
2'-0" M IN. SUM P
BASE RISER(VARIES) 1' M IN. 1'-6" 6
8"4'-0"
5'-4"
6" 8" M IN.
6"
FLOW LINE
KNOCKOUT
(TYPE "C-L" SHOWN)
PRECAST TOP
ABOVE THIS ELEV.
PERVIOUS BACKFILL
NOT TO SCALE
I.D. + 36" FOR PIPE 30" & OVER
I.D. + 24" FOR PIPE UNDER 30"
& BACKFILL
TRENCH EXCAVATION
SUBGRADE
ø (I.D.)
PIPE O.D. 24"
PLACED BY HAND
12" IN ROCK
6" IN EARTH
MATERIAL
BEDDING
0.25 O.D.
LIMITS OF
BANK RUN GRAVEL
ON PRIVATE SITE USE1.
COMPACTED IN 6" LIFTS3.
MATERIAL
FILL OR APPROVED NATIVE
OTHER AREAS GRANULAR2.
PROCESSED STONE
IF UNDER PAVEMENT1.
NOT TO SCALE
2'-6"
2'-0"
2'-0"
2'-6"VARIES (1)
1.CONTRACTOR TO FIELD CONFIRM
RISER HEIGHT. TYPICAL HEIGHTS
1' (BLANK), 2', 2.5' & 3'.
2.REINFORCING STEEL WELDED WIRE
ASTM SPEC. A185.
3.REINFORCING STEEL DEFORMED BARS
ASTM SPEC. A615.
4.CONCRETE COMPRESSIVE STRENGTH
4,000 PSI MIN. AT 28 DAYS
5.STRUCTURE SHALL BE DESIGNED FOR
H-20 LOADING.
NOTES:
ALL SIDES (TYP.)
16"Ø KNOCKOUT
PER PLAN
& GRATE - SET TF
CAST IRON FRAME
3" BASE SLAB
NOT TO SCALE
8"4'-0"
5'-4"
NOT TO SCALE
4'-0" SUM P
30.2"
11.8"
17.2"
BASE
LINE
FLOW
12" HDPE
& YD OUTLET PIPES
BE INSTALLED AT ALL CB
OR APPROVED EQUAL TO
NYLOPLAST ENVIROHOOD
FLAT PRECAST
MOUNTED TO
ENVIROHOOD
NOT TO SCALE
48" DIA.
5"
5"6"
SECTION
PRECAST CONE
SECTION(S)
PRECAST RISER
SECTION
PRECAST BASE
4"
6"
6"
AND COVER
CAST IRON FRAME
6" MIN. - 12" MAX.
OR BRICK
WITH CONC. BLOCKS
ADJUST FRAME ELEV.
BRICK INVERT
CONCRETE OR
BRICK & MORTAR
KNOCKOUT WITH
BETWEEN PIPE AND
SEAL ANNULAR SPACE
FILTER FABRIC
STONE BASE OVER
" CRUSHED4 312" OF
PIPES
KNOCKOUTS FOR
@ SPRING LINE
SHELF MIN. 1" PITCH
CONCRETE OR BRICK
& SECTION 10 OF ASTM SPEC. C497.
SECTION 16 OF ASTM SPEC. C478
LATEST OSHA REG. 29 CFR 1910.27,
MANHOLE STEPS SHALL MEET5.
STRENGTH 4,000 PSI MIN.
CONCRETE COMPRESSIVE4.
BARS ASTM SPEC. A615.
REINFORCING STEEL DEFORMED3.
WIRE ASTM SPEC. A185.
REINFORCING STEEL WELDED2.
AASHTO SPEC. M-198.
BUTYL RUBBER MASTIC TYPE
JOINT SEALANT SHALL BE1.
NOTES:
NOT TO SCALE
NOTE:
FRAME AND COVER E.L. LEBARON FOUNDRY
CATALOG NUMBER LA266 OR APPROVED EQUAL.
FRAME & COVER DETAIL
GAS HOLES (TYP. OF 4)
PICK HOLES (TYP.)
35"
6"
24"
PAVEMENT RESTORATION OVER TRENCH
TEMPORARY REPAIR PERMANENT REPAIR
NOTE:
d
d
HALF SECTION A-A
TYPE A (D 12")
TYPE B (D 12")
TYPICAL SUPPORT FOR UTILITIES
A
A
SUPPORTS TO BE LOCATED AS SHOWN ON DRAWINGS OR AS DIRECTED BY ENGINEER.2.
d=DISTANCE FROM TOP OF STORM LINE TO BOTTOM OF EXISTING UTILITY LINE.1.
NOTES:
SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE: AS SHOWN
PROJECT NUMBER:
00222 - 001
1 0 1 2 3
DATE DESCRIPTION
8/31/26 SITE PLAN SUBMISSION
SHEET
DATE
REVISED
4/30/26
8/31/26
OF 8 9
REVISION SUMMARY
DORSET CROSSING PAD
LOT F - SITE DEVELOPMENT PLANS
PREPARED FOR
DIAMOND SPARKLE CAR WAS LLC, APPLICANT
DETAILS
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)
NOT TO SCALE
PAVEMENT REPAIR
SAWCUT
PAVEMENT
EXISTING
UNDISTURBED
20" FOR ARTERIAL
14" FOR COLLECTOR
13" FOR LOCAL ROAD
GRANULAR FILL
AREA
REQUIRED WITHIN TRENCH
*COMPACTION OF BACKFILL
ELEVATION
SUBGRADE
CONCRETE SURFACE COURSE
2" CLASS 2 TEMP. BITUMINOUS
12" SUBBASE
RECOMPACTED
MILLED PAVEMENT EDGES
APPLIED TO ALL CUT OR
PAVEMENT JOINT SEALER
4" HMA S1.0
2" HMA S0.5
2" HMA S0.5
MILL AND OVERLAY FINISH COURSE
DETERMINED IN THE FIELD BY THE DOT INSPECTOR.
ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH CT DOT STANDARDS OR AS OTHERWISE1.
NOTES:
LIMIT OF TEMPORARY
TRENCH WIDTH
LIMIT OF TRENCH
SAWCUT 6" BEYOND
10' (TYP.)
LIMIT OF PERMANENT PAVEMENT REPAIR
PAVEMENT
EXISTING
STRUCTURE 3
&REPLACE WITH PAVEMENT
REMOVE TEMPORARY PAVEMENT
6" 6"
1
6"
MIN.
NOT TO SCALE
EXIST. UTILITY (OR STORM)
SIDES OF MAIN TRENCH
TO BE PLACED BETWEEN
COMPACTED CRUSHED STONE
BACKFILL
COMPACTED SAND
STONE FOR PIPE BEDDING
TOP OF COMPACTED CRUSHEDEXIST. UTILITY (OR STORM)
EXIST. UTILITY (OR STORM)
OR SHEETING
UNDISTURBED MATERIAL
EXIST. UTILITY (OR STORM)
COMPACTED PIPE BEDDING
TRENCH
FOR FULL WIDTH OF
CLASS "A" CONCRETE
2 11
THE ENGINEER.
ON THE DRAWINGS OR AS DIRECTED BY
SUPPORTS TO BE LOCATED AS SHOWN1.Page 45
LATERAL CONNECTION
SECTION
PLAN VIEW
3"
5"
3"
PRECAST SANITARY MANHOLE
FRAME & COVER DETAIL
APPROVED EQUAL.
FRAME TO BE CAMPBELL FOUNDRY PATTERN NO. 1007D OR2.
MANHOLE COVER TO BE AASHTO HS20-44 HIGHWAY LOADING.1.
NOTES:
SANITARY TRENCH SECTION
NOT TO SCALE
+/-
O.D.
REFER TO PAVEMENT REPAIR AND TRENCH DETAIL
CONDITIONS AS DIRECTED BY THE ENGINEER
*CRUSHED STONE SHALL ONLY BE USED IN HIGH GROUNDWATER
FINISH GRADE BLUE WARNING TAPE
COMPACTED IN 12" LAYERS
BACKFILL PLACED AND
THE ENGINEER
IN ROCK AS DIRECTED BY
FILTER FABRIC REQUIRED
AS BEDDING MATERIAL.
CRUSHED STONE IS USED
OVERLAP REQUIRED WHEN
FILTER FABRIC WITH 12"
COMPLETE ENVELOPE OF
12" ROCK
6" EARTH
IS ENCOUNTERED
WHEN UNSUITABLE MATERIAL
OR CRUSHED STONE AS DIRECTED
GRAVEL FILL SHALL BE GRAVEL
IN 6" LAYERS
STONE, PLACED & COMPACTED
" CRUSHED4 3" TO 8 3SAND OR
GRADING C) WELL GRADED
BE BANK GRAVEL (DOT
BEDDING MATERIAL SHALL
30° BEND
BRANCH
45° WYE
30° BEND
OVERLAP
LATERAL WITH 12"
AROUND STONE &
WRAP FILTER FABRIC
ABOVE LATERAL
MIN 12" - MAX. 24"
METALLIC WARNING TAPE
SEWER MAIN
TRENCH SECTION.
CONFORM TO TYPICAL SANITARY
SANITARY LATERALS SHALL1.
NOTE:
GRADE
FINISHED
" Ø STEEL ROD2 1
PLATE WELDED TO 18"
6" X 6" STEEL MARKER
STREET LINE
PLATE
MARKER
MIN. 6" DIA.
SEWER LATERAL
SEWER MAIN
FLOW
FLOW
(TYP.)
MIN. 2% SLOPE
NOT TO SCALE
18"
3"
45°
12"
BEDDING
PIPE
BLANKET
SAND
PIPE AND CAP
WITH BELL END OF
END LATERAL STUB
RISER 3'-0" OR 4'-0"2'-0"
12" TYP.
5'-0" DIA.
8" TYP.
7"
MIN. 8" CRUSHED STONE BASE
HEAVY DUTY FRAME AND COVER
FRAME WITH CLASS "A" CONC.
IN UNPAVED AREA ANCHOR
DURING MANUFACTURE
CAST IN PRECAST UNIT
MANHOLE STEPS TO BE
(1'-6" MAX)
TO FIST JOINT
(CLASS "A" CONCRETE)
CONCRETE SUPPORT
NOT TO SCALE
WALL (TYP.)
FLUSH W/ INSIDE
END OF PIPE CUT
BRICK & MORTAR
CLASS "A" CONCRETE OR
SANITARY MANHOLE
BE APPLIED TO EXTERIOR OF
BITUMINOUS SEALANT SHALL
OR BUTYL ROPE JOINT SEAL
"O" RING RUBBER GASKET
" MORTAR & MAX HEIGHT OF 12"2 1OF
WITH BRICK WITH A MIN. HEIGHT
ADJUST FRAME TO FINAL GRADE
5" 5"
5"
BASE SECTION
1'-0" M IN.
OPENING
ABOVE
RISER
1'-0"
TRANS.
TO 4' M AX
12" M IN. ECCENTRIC CONE
DIA.
2'-0"
NOT TO SCALE
'8 12
2'
2'
'8 1
'16 11
'16 131
2'
'16 132
NOTES:
DETERMINED BY A STANDARD PROCTOR TEST. UNDER UNPAVED AREAS COMPACT TO 90%.
UNDER PAVED AREAS COMPACT BACKFILL TO 95% OF THE MATERIAL'S MAXIMUM DRY DENSITY AS 4.
BY THE TOWN ENGINEER OR GRANULAR FILL M.02.01 PLACED AND COMPACTED IN 12" LOOSE LIFTS.
BACKFILL SHALL BE SUITABLE NATIVE MATERIAL UNLESS DETERMINED TO BE UNSUITABLE 3.
ALL MATERIALS ARE TO MEET CONN. DOT SPECIFICATIONS FORM 816 AS AMENDED.2.
INSTALLING PIPE UNDER UNPAVED AREAS.
PROVIDE SINGLE LAYER OF FILTER FABRIC BETWEEN STONE AND SAND BLANKET WHEN 1.
6" MIN.
NOT TO SCALE
OD + 2' (3' MIN.)
GRADE
24" BELOW FINISHED
POINT AND AT LEAST
CUT SHEETING AT THIS
TOWN ENGINEER
DIRECTED BY THE
UNLESS OTHERWISE
SHALL REMAIN IN PLACE
SHEETING IF REQUIRED
UNDISTURBED FIRM MATERIAL
EQUAL)
12" OVERLAP (MIRAFI 140N OR
FILTER FABRIC ENVELOPE WITH
WRAP STONE & PIPE WITH
ABOVE PIPE
MIN. 12" - MAX. 24"
METALLIC WARNING TAPE
AS REQUIRED
STONE
3/4" CRUSHED
6" SAND
SEE NOTE 3
BACKFILL
APPROVED
WHERE ORDERED BY ENGINEER
CRUSHED STONE (M.01.01-6)
"4 3AND REPLACE WITH
REMOVE UNSUITABLE MATERIAL
12" MIN.
OD
TYPICAL TRENCH DETAIL (WATER)
PIPE O.D.+ 24" OR 3' MIN.
12"PIPE VARIES
24"
5'-0" COVER
TO CUSTOMER
4'-6"
TO WATER MAIN
NOT TO SCALE
CONNECTION
WATER SERVICE
WATER MAIN
"CC" BY COMPRESSION
CORPORATION STOP
MASONRY UNIT
FLAT STONE OR
THREAD NO DRAIN
COPPER SERVICE
CURB STOP
(FOR 2" ONLY)
AFTER BEND
ADJACENT TO MAIN
SHALL BE IN STREET
CURB STOP LOCATION
SHUT-OFF VALVE/
ADDITIONAL 2"
FINISH GRADE
45°
(SIZE PER PLAN)
COPPER TUBING TYPE "K"
IN COVER
"WATER" CAST
TO 5'-0" MUELLER TYPE
TWO PIECES WHICH EXTEND
CURB BOX WITH COVER
MIN.
DEPTH OF BURY
NOT TO SCALE
OR DUCT BANK
TYPICAL U/G CONDUIT
GRADE
TAPE
WARNING
DETECTABLE
3"
30"
6"
18"
12"
3"
MIN.
13"
CONDUIT AS NEEDED.
WIDEN WITH 2" MIN SPACING BETWEEN
4", 5" OR 6" SCH-40 PVC STACK AND/OR
DIRECT-BURIED CONDUIT
MASON SAND FOR
CONCRETE FOR DUCT OR
GAS MAIN
NOT TO SCALE
MIN. MIN.
GAS MAIN TRENCH DETAIL
SEE PAVEMENT RESTORATIONE-ROAD REPAIR
30" (MIN.)D-COVER
AS REQUIREDC-APPROVED BACKFILL
8" OVER PIPEB-SAND BACKFILL
12"A-SAND BEDDING
D
A
B
C
E
12" 12"
3'-0"
NOT TO CONTACT W/ PIPE)
MAIN PIPE WITHIN 5". (WIRE
OR PARALLEL TO GAS
PLACE TRACER WIRE ABOVE
MARKING TAPE
FINISHED GRADE
SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE: AS SHOWN
PROJECT NUMBER:
00222 - 001
1 0 1 2 3
DATE DESCRIPTION
8/31/26 SITE PLAN SUBMISSION
SHEET
DATE
REVISED
4/30/26
8/31/26
OF 9 9
REVISION SUMMARY
DORSET CROSSING PAD
LOT F - SITE DEVELOPMENT PLANS
PREPARED FOR
DIAMOND SPARKLE CAR WAS LLC, APPLICANT
DETAILS
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F) Page 46
Page 47
Page 48
SPILL PREVENTION & CONTROL (SPC) PLAN DIAMOND SPARKLE CAR WASH 10 DORSET CROSSING DRIVE SIMSBURY, CONNECTICUT AUGUST 2026 Prepared by ATLAS ENVIRONMENTAL COMPANY 90 Starr Hill Road Groton, Connecticut 06340
Page 49
ATLAS ENVIRONMENTAL COMPANY Diamond Sparkle Car Wash – 10 Dorset Crossing Drive, Simsbury September 2026 SPC Plan Page i TABLE OF CONTENTS 1.0 INTRODUCTION 1 1.1 Purpose 1 1.2 Applicability 1 1.3 Overview of this SPC Plan 1 2.0 SPC PLAN ADMINISTRATION 2 2.1 Management Approval and Designated Person 2 2.2 Certification 3 2.3 Location of SPC Plan 4 2.4 Plan Amendment and Review 4 3.0 FACILITY DESCRIPTION 5 4.0 CHEMICAL INVENTORY 6 5.0 SPILL PREVENTION EQUIPMENT AND STRUCTURES 8 5.1 General Secondary Containment 8 5.2 Specific Secondary Containment 8 6.0 SPILL PREVENTION PROCEDURES 9 7.0 EMERGENCY RESPONSE EQUIPMENT 10 8.0 SPILL PREVENTION PROCEDURES 11 8.1 Response to a Minor Release 11 8.2 Response to a Major Release 12 8.3 Waste Disposal 13 9.0 FOLLOW-UP REPORTING AND DOCUMENTATION 14 10.0 EMPLOYEE TRAINING PROGRAM 15 11.0 IMPLEMENTATION PLAN 16 List of Appendices Appendix A Site Plan and Facility Diagram Appendix B Facility Inspection Checklists Appendix C Record of Annual Spill Prevention Training Appendix D Plan Review Log Appendix E Notification Forms
Page 50
ATLAS ENVIRONMENTAL COMPANY Diamond Sparkle Car Wash – 10 Dorset Crossing Drive, Simsbury September 2026 SPC Plan Page ii Emergency Contacts Facility Spill Response Coordinators _____________________, Spill Response Coordinator ....................... (XXX) XXX-XXXX _____________________, Alternate Spill Response Coordinator ........ (XXX) XXX-XXXX Emergency Agencies National Response Center ........................................................................ (800) 424-8802 Connecticut Department of Environmental Protection (CTDEEP) ............. (860) 424-3338 Fire Department .......................................................................................................... 911 Police Department ....................................................................................................... 911 Connecticut State Police ........................................................................... (860) 566-5990 State Emergency Response Commission (SERC) .................................... (860) 424-3373 UConn John Dempsey Hospital ................................................................ (844) 388-2666 United States Environmental Protection Agency, Region 1 ....................... (617) 918-1111 Spill Response and Cleanup Contractors The following businesses are capable of Various Environmental Services including soil and groundwater site remediation; immediate Contractor response to discharge, spillage, uncontrolled loss, seepage, or filtration of oil, petroleum, chemical liquids or solids, or hazardous waste upon land or into waters of the State; and other similar environmental work: • Environmental Services, Inc. .......................................................... (860) 528-9500 • Manafort Brothers Inc. .................................................................... (860) 229-4853 • Moran Environmental Recovery, LLC ............................................. (203) 270-0095 • ACV Environmental Services, Inc. .................................................. (203) 238-8153 • Cisco LLC ....................................................................................... (203)-752-2558 • NRC East Environmental Services Inc. .......................................... (508)-966-6000 • Laydon Industries, LLC ................................................................... (203)-562-7283
Page 51
ATLAS ENVIRONMENTAL COMPANY Diamond Sparkle Car Wash – 10 Dorset Crossing Drive, Simsbury September 2026 SPC Plan Page 1 1.0 INTRODUCTION 1.1 Purpose The purpose of this Spill Prevention & Control (“SPC”) Plan is to describe measures to be implemented by Diamond Sparkle Car Wash to prevent releases from occurring at their proposed Facility, and to prepare to respond in a safe, effective, and timely manner to mitigate the impacts of any spill that may occur. The proposed Facility will be located at 10 Dorset Crossing Drive in Simsbury, Connecticut as shown on the General Location Map (Figure 1 of Appendix A). 1.2 Applicability The Facility is required to prepare, maintain, and follow an SPC because it is registered for the General Pretreatment Permit for Non-Significant Industrial User Discharges to Publicly Owned Treatment Works (non-SIU GP). The non-SIU GP requires permittees to prepare an SPC Plan, and says at a minimum, the plan must include all of the elements described in this general permit and describe all measures taken to prevent and control unplanned releases during the storage, collection, transfer, transport, treatment, loading and unloading of all toxic or hazardous substances, oils, process wastewaters, and solvents. 1.3 Overview of this SPC Plan According to the SIU GP, an adequate SPC Plan must contain the following: • Site Plan and Topographic Map • Chemical Inventory • Spill Prevention Equipment and Structures • Storage Facilities and Spill Risk Evaluation • Spill Prevention Procedures • Emergency Response Equipment • Spill Response Procedures • Follow-up Reporting and Documentation • Employee Training Program • Spill History
Page 52
ATLAS ENVIRONMENTAL COMPANY Diamond Sparkle Car Wash – 10 Dorset Crossing Drive, Simsbury September 2026 SPC Plan Page 2 2.0 SPC PLAN ADMINISTRATION 2.1 Management Approval and Designated Person Diamond Sparkle Car Wash is committed to preventing releases of oil or chemicals to the environment, and to maintaining the highest standards for spill prevention and control through the implementation and regular review and amendment to this SPC Plan. This SPC Plan has the full approval of the Diamond Sparkle Car Wash management, and Diamond Sparkle Car Wash has committed the necessary resources to implement the measures described in this Plan. Authorized Facility Representative: Rodney Goldberg is the Designated Person Accountable for Oil Spill Prevention at the Facility and has the authority to commit the necessary resources to implement this SPC Plan. Rodney Goldberg Name Title ______________________________ ______________ Signature Date Diamond Sparkle Car Wash has designated the following individuals as the Spill Response Coordinators for this SPC Plan: Spill Response Coordinator: TBD Title Office: (860) ___-____ Cell: (860) ___-____ Email: Alternate Spill Response Coordinator: TBD Title Office: (860) ___-____ Cell: (860) ___-____ Email:
Page 53
ATLAS ENVIRONMENTAL COMPANY
Diamond Sparkle Car Wash – 10 Dorset Crossing Drive, Simsbury September 2026
SPC Plan Page 3
2.2 Certification
The undersigned Certified Hazardous Materials Manager attests that he is familiar with
the SPC requirements, has visited and examined the Facility, and this SPC Plan has
been prepared in accordance with accepted and sound industry practices and
standards and with the rule requirements including:
• The SPC Plan does not deviate from any rule requirements;
• Is being fully implemented;
• The facility meets the qualifying criteria;
• Procedures for required inspections and testing have been established;
• Management approves the Plan and has committed resources to implement it.
Plato Doundoulakis, CHMM
Atlas Environmental Company
___________________________
Signature
_______________
Date
Page 54
ATLAS ENVIRONMENTAL COMPANY Diamond Sparkle Car Wash – 10 Dorset Crossing Drive, Simsbury September 2026 SPC Plan Page 4 2.3 Location of SPC Plan A complete copy of this SPC Plan is maintained at the Facility. 2.4 Plan Amendment and Review 2.4.1 Changes in Facility Configuration Diamond Sparkle Car Wash periodically reviews and evaluates this SPC Plan for any change in the Facility design, construction, operation, or maintenance that materially affects the Facility’s potential for an oil release, including, but not limited to: • commissioning of hazardous materials containers; • reconstruction, replacement, or installation of piping systems; • construction or demolition that might alter secondary containment structures; • changes of product or service, • revisions to standard operation, • modification of testing/inspection procedures, and • use of new or modified industry standards or maintenance procedures. Amendments to the SPC Plan made to address changes of this nature are referred to as technical amendments. Non-technical amendments can be made by Diamond Sparkle Car Wash. Non-technical amendments include the following: • change in the name or contact information (i.e., telephone numbers) of individuals responsible for the implementation of this SPC Plan; or • change in the name or contact information of spill response or cleanup contractors. Diamond Sparkle Car Wash must make the needed revisions to the SPC Plan as soon as possible, but no later than six months after the change occurs. The SPC Plan must be implemented as soon as possible following any technical amendment, but no later than six months from the date of the amendment. Rodney Goldberg is responsible for initiating and coordinating revisions to the SPC Plan.
Page 55
ATLAS ENVIRONMENTAL COMPANY Diamond Sparkle Car Wash – 10 Dorset Crossing Drive, Simsbury September 2026 SPC Plan Page 5 3.0 FACILITY DESCRIPTION The Facility is planned to be located at 10 Doret Crossing Drive, Simsbury, Connecticut, as shown on the General Location Map (Figure 1). The General Building Plan (Figure 2) shows the layout of the Facility.
Page 56
ATLAS ENVIRONMENTAL COMPANY Diamond Sparkle Car Wash – 10 Dorset Crossing Drive, Simsbury September 2026 SPC Plan Page 6 4.0 Chemical Inventory Following is a complete list of all products that are currently planned to be used at the Facility, their ingredients, and the respective C.A.S. number: # Name Ingredient C.A.S Number 1 RX1 Presoak & Prep by Simoniz USA, Inc. Tetrasodium Ethylenediaminetetraacetate 64-02-8 Disodium Metasilicate 6834-92-0 Ethoxylated Amine Trade Secret Dodecyldimethylamine Oxide 1643-20-5 D-Glucopyranose, oligomers, Decyl Octyl Glycosides 68515-73-1 D-Glucopyranose, oligomeric, C10-16-alkyl Glycosides 110615-47-9 2 RX2 Wheel & Rim Cleaner by Simoniz USA, Inc. Tetrasodium EDTA 64-02-8 Laurylamine Oxide 1643-20-5 Potassium Hydroxide 1310-58-3 3 RX3 Lubricating Soap by Simoniz USA, Inc. Citric Acid 77-92-9 Lauryl Dimethyl Amine Oxide 1643-20-5 PEG-15 Cocomonium Chloride 61791-10-4 4 RX4 Blue Triple Foam by Simoniz USA, Inc. Citric Acid 77-92-9 Cocoamidopropyl Betaine 61789-40-0 Lauryl Dimethyl Amine Oxide 1643-20-5 5 RX4 Red Triple Foam by Simoniz USA, Inc. Citric Acid 77-92-9 Cocoamidopropyl Betaine 61789-40-0 Lauryl Dimethyl Amine Oxide 1643-20-5 6 RX4 White Triple Foam by Simoniz USA, Inc. Citric Acid 77-92-9 Cocoamidopropyl Betaine 61789-40-0 Lauryl Dimethyl Amine Oxide 1643-20-5 7 RX4 Yellow Triple Foam by Simoniz USA, Inc. Citric Acid 77-92-9 Cocoamidopropyl Betaine 61789-40-0 Lauryl Dimethyl Amine Oxide 1643-20-5 8 RX5 Sealer by Simoniz USA, Inc. Citric Acid 77-92-9 Detergent Range Alcohol Ethoxylate 68439-46-3 Quaternary ammonium compounds, coco alkylbis(hydroxyethyl)methyl, ethoxylated, chlorides 61791-10-4
Page 57
ATLAS ENVIRONMENTAL COMPANY Diamond Sparkle Car Wash – 10 Dorset Crossing Drive, Simsbury September 2026 SPC Plan Page 7 # Name Ingredient C.A.S Number 9 RX 6 Drying Agent by Simoniz USA, Inc. Citric Acid 77-92-9 Detergent Range Alcohol Ethoxylate 68439-46-3 10 RX7 Presoak & Prep by Simoniz USA, Inc. Detergent Range Alcohol Ethoxylate 68439-46-3 Lauryl Dimethyl Amine Oxide 1643-20-5 PEG-15 Cocomonium Chloride 61791-10-4 Percentages 11 Simoniz Hot Wax and Shine by Simoniz USA, Inc. Cocamidopropyl betaine 61789-40-0 Fatty Quaternary Ammonium Compound Proprietary Silicone Quaternary Compound Proprietary Nonionic Emulsifier Proprietary Isostearamidopropyl ethyldimonium ethosulfate 67633-63-0 Lauryldimethylamine oxide 1643-20-5 Carnauba wax 8015-86-9 12 RX10 Bug Out by Simoniz USA, Inc. Ethanolamine 141-43-5 Surfactant Blend Trade Secret Dipropylene glycol monomethyl ether 34590-94-8 Tripotassium EDT A 17572-97-3 13 RX HPH by Simoniz USA, Inc. Surfactant Blend Trade Secret Potassium hydroxide 1310-58-3 Tetrapotassium EDTA 5964-35-2 14 Simoniz Carbonite by Simoniz USA, Inc. Distillates, petroleum, hydrotreated middle 64742-46-7 Dialkyl Quaternary Ammonium Chloride 61789-77-3 2-Butoxy Ethanol 111-76-2 PEG-15 Cocomonium Chloride 61791-10-4 15 Ceramic Sealant by Simoniz USA, Inc. Trade Secret Trade Secret
Page 58
ATLAS ENVIRONMENTAL COMPANY Diamond Sparkle Car Wash – 10 Dorset Crossing Drive, Simsbury September 2026 SPC Plan Page 8 5.0 SPILL PREVENTION EQUIPMENT AND STRUCTURES The Facility will use robust spill prevention measures that will be structural, redundant, and passive. All car wash products will be stored in the Equipment Room, which is considered general secondary containment. Within the Equipment Room will be a constructed Bermed Area, which is considered specific secondary containment. The Facility plans on using 15 different products including soap, cleaners, waxes, and paint protectants. All products come in 30 or 55-gallon drums, but the final container sizes for each product that will be used at the facility have not been determined yet. This preliminary SPC Plan assumes all products will be kept in 55-gallon drums, and the final plan will take into consideration the size of the final containers. 5.1 General Secondary Containment The floor in the Equipment Room will be sloped to the center of the room, and the direction of flow for any release in this room would be toward the floor drain. The floor drain will first discharge to an oil/grit separator with a capacity of at least 1,000 gallons. After treatment in the oil/grit separator, the wastewater will discharge to the sanitary sewer, which flows to the publicly owned Treatment Works (POTW). In the worst-case scenario where the contents of a full drum are released at once, the maximum quantity would be 55 gallons, and the floor drain would be able to handle the release rate. 5.2 Specific Secondary Containment The current version of Figure 3 shows 15 full 55-gallon drums that are in-use and five empty drums that are waiting to be picked up with the next delivery. The current plan shows the Bermed Area to be 46 feet long by 2.5 wide, which would provide over 107 gallons of specific secondary containment. The final size of the Bermed Area will be based on the total volume of car wash products stored within it, and it will be able to contain at least 40% of all the aggregate storage.
Page 59
ATLAS ENVIRONMENTAL COMPANY Diamond Sparkle Car Wash – 10 Dorset Crossing Drive, Simsbury September 2026 SPC Plan Page 9 6.0 SPILL PREVENTION PROCEDURES The following best management practices will be implemented to prevent releases during the handling, use, or transfer of car wash products at the Facility: • All unloading and transfer of car wash products will occur inside the Equipment Room, and no empty or full containers will be kept outside. • All new, full, and empty containers will be kept within the Bermed Area in the Equipment Room. • All facility personnel will receive training in the proper handling of car wash chemicals and these best management practices. • Facility personnel will observe and monitor any outside people that enter the Equipment Room and ensure that the overhead door remains closed except when needed. • Facility personnel will conduct monthly inspections and maintain inspection records.
Page 60
ATLAS ENVIRONMENTAL COMPANY Diamond Sparkle Car Wash – 10 Dorset Crossing Drive, Simsbury September 2026 SPC Plan Page 10 7.0 EMERGENCY RESPONSE EQUIPMENT The Spill Response Equipment includes absorbent material, sorbent booms, and sorbent socks will be positioned inside the Equipment Room. Liquid spills should not be cleaned up by rinsing or hosing down the spill. Instead, use dry absorbent, then immediately sweep up the absorbent. The Spill Response Equipment should include a shovel, a broom, heavy duty bags for disposal, and gloves. The Spill Response Equipment inventory should be checked monthly to ensure that used material is replenished and all equipment is present.
Page 61
ATLAS ENVIRONMENTAL COMPANY Diamond Sparkle Car Wash – 10 Dorset Crossing Drive, Simsbury September 2026 SPC Plan Page 11 8.0 SPILL PREVENTION PROCEDURES This section describes the response and cleanup procedures in the event of an oil release or spill. The uncontrolled release or spill of oil to groundwater, surface water, or soil is prohibited by state and possibly federal laws. Immediate action must be taken to control, contain, and recover released product. In general, the following steps are taken: • Identify the type of oil being released; • If possible and safe to do so, identify and shut down the source of the release to stop the flow; • Contact the Spill Response Coordinator or his/her alternate; • Notify emergency and regulatory authorities as required; • Contain the release with spill response materials and equipment; • Clean up the spill and confirm remediation of the release; • Properly handle and dispose of cleanup waste and recovered product; and • Document response and cleanup and retain records. For the purpose of establishing appropriate response procedures, this SPC Plan classifies releases as either “minor” or “major,” depending on the volume and characteristics of the material released. 8.1 Response to a Minor Release A “minor” release is defined as one that poses no significant harm (or threat) to human health and safety or to the environment. Minor releases are generally those where: • The quantity is small (e.g., may involve less than five gallons); • Release is easily stopped and controlled at the time of the discovery; • Release is localized near the source; • Release is mitigated or remediated within two hours; • Release does not extend outside the building; • There is low risk to human health or safety; and • There is low risk of fire or explosion. Minor releases can usually be cleaned up by the Facility personnel. The following guidelines apply: • Identify the type of material released. • Locate the source of release and immediately stop the release. • Immediately notify the Spill Response Coordinator.
Page 62
ATLAS ENVIRONMENTAL COMPANY Diamond Sparkle Car Wash – 10 Dorset Crossing Drive, Simsbury September 2026 SPC Plan Page 12 • Spread absorbent materials near the source of the spill and along the drainage path of the flow toward the floor drain or especially any doorway. • Contain the car wash product with spill response materials and equipment. • Clean up absorbent materials and collect in properly labeled waste containers for appropriate disposal. • Ensure that there are no impacts left to the pavement that could impact stormwater runoff. • The Spill Response Coordinator must report the release to the CTDEEP Oil and Chemical Spills Division at (860-424-3338) if: o The spill is five gallons or more, o cannot be mitigated or remediated within two hours, or o It can reach a catch basin or any water body. 8.2 Response to a Major Release A “major” release is defined as one that cannot be safely controlled or cleaned up by personnel, such as when: • The release is large enough to spread beyond the immediate release area; • The released oil enters or threatens to enter the stormwater system; • The released oil poses a hazard to human health or safety; or • There is a danger of fire or explosion. In the event of a major release, the following guidelines apply: • Locate the source of release and immediately stop release if possible. • Restrict access to the area. • If safe to do so, spread absorbent materials near the source of the spill and along the drainage path of the flow toward drainage structures or open channel areas. In particular, place absorbent materials, as well as temporary berms or other barriers, around the nearest catch basins or cover catch basin with a catch basin blocker mat. • The Spill Response Coordinator (or senior on-site person) must call a spill response and cleanup contractor. A list of businesses that are licensed to provide spill response and cleanup services in Connecticut and are on the State’s bid list is provided on Page iii. • The Spill Response Coordinator (or senior on-site person) must immediately contact the CTDEEP Oil and Chemical Spills Division (OCSD) (860-424-3338). • If the spill can enter a catch basin, the Spill Response Coordinator (or senior on- site person) must immediately contact the U.S. Coast Guard National Response Center (888-424-8802).
Page 63
ATLAS ENVIRONMENTAL COMPANY Diamond Sparkle Car Wash – 10 Dorset Crossing Drive, Simsbury September 2026 SPC Plan Page 13 • The Spill Response Coordinator (or senior on-site person) coordinates cleanup and obtains assistance from a cleanup contractor or other response organization as necessary. • The Spill Response Coordinator (or senior on-site person) must record the incident on the Release or Spill Notification Form in 0 F and the form will be maintained in the SPC file. 8.3 Waste Disposal Waste resulting from a minor release response will be containerized in impervious bags, drums, or buckets. The Spill Response Coordinator will characterize the waste for proper disposal and ensure that it is removed from the Facility by a licensed waste hauler within two weeks. Wastes resulting from a major release response will be removed and disposed of by a cleanup contractor.
Page 64
ATLAS ENVIRONMENTAL COMPANY Diamond Sparkle Car Wash – 10 Dorset Crossing Drive, Simsbury September 2026 SPC Plan Page 14 9.0 FOLLOW-UP REPORTING AND DOCUMENTATION Notification of a release may be required depending on the severity of the release and whether it is contained on-site or threatens to affect navigable waters or the environment. Conditions requiring agency release notifications are described below. Contact information for reporting a release to the appropriate authorities is listed in Page iii and is posted inside the front entrance. 9.1.1 National Response Center Any size release (i.e., one that creates a sheen, emulsion, or sludge) that affects or threatens to affect navigable waters or adjoining shorelines must be reported immediately to the National Response Center (1-800-424-8802). The Center is staffed 24 hours a day. A Release or Spill Notification Form is included in Appendix E to facilitate reporting. The person reporting the release must provide the following information: • Name, location, organization, and telephone number • Name and address of the party responsible for the incident • Date and time of the incident • Location of the incident • Source and cause of the spill or release • Types of oil(s) spilled or released • Quantity of oils spilled or released • Danger or threat posed by the spill or release • Number and types of injuries (if any) • Media affected or threatened by the release (i.e., water, land, air) • Weather conditions at the incident location • Any other information that may help emergency personnel respond to the incident 9.1.2 CTDEEP Reporting of Releases (RCSA 22a-450) The Spill Response Coordinator must report any release of petroleum to the CTDEEP if: • The spill is five gallons or more, • cannot be mitigated or remediated within two hours, or • It can reach a catch basin or any water body. The contact number for the CTDEEP Oil and Chemical Spill Hotline is 860-424-3338. The CTDEEP does not require a written report unless they specifically request one.
Page 65
ATLAS ENVIRONMENTAL COMPANY Diamond Sparkle Car Wash – 10 Dorset Crossing Drive, Simsbury September 2026 SPC Plan Page 15 10.0 EMPLOYEE TRAINING PROGRAM The Spill Response Coordinator is responsible for oil release prevention, control, and response preparedness activities at the Facility. The facility personnel will be trained in the operation and maintenance of the pollution prevention equipment, release procedure protocols, applicable pollution control laws, rules and regulations, general facility operations, and the content of this SPC Plan. Any new facility personnel are provided with this same training. 10.1.1 Monthly Inspection The Inspection Checklist provided in Appendix B is used for monthly inspections by Facility personnel. The monthly inspections cover the following key elements: • Observing the condition of the drums and other equipment in the Equipment Room for signs of deterioration, leaks, or corrosion. • Checking piping and associated appurtenances (i.e. valves, flanges) for leaks and deterioration. • Observing the floor of the Equipment Room for signs of a release or staining. • Verifying the proper functioning of secondary containment berm. • Checking the inventory of spill response equipment and recommend restocking as needed. All problems regarding drums, piping, containment, or response equipment must immediately be reported to the Spill Response Coordinator. Visible leaks from a drum, piping, or other components must be repaired as soon as possible to prevent a larger spill. Pooled liquids are removed immediately upon discovery.
Page 66
ATLAS ENVIRONMENTAL COMPANY Diamond Sparkle Car Wash – 10 Dorset Crossing Drive, Simsbury September 2026 SPC Plan Page 16 11.0 IMPLEMENTATION PLAN The facility will fully implement this SPC Plan and be compliant with the SPC regulations by following the Implementation Plan presented below. The Facility will complete the far-right column at the time that each item is implemented. Item Description Implementation Date Date Addressed
Page 67
ATLAS ENVIRONMENTAL COMPANY Diamond Sparkle Car Wash – 10 Dorset Crossing Drive, Simsbury September 2026 SPC Plan Appendix Appendix A Figures
Page 68
N General Location Map FIGUREFIGURE N0 2,000' 4,000' Scale 2024 USGS Quadrangle Maps of Tariffville, CT Connecticut Site 10 Dorset Circle Simsbury, Connecticut 60722 Date:9/1/26 90 Starr Hill Road Groton, Connecticut 860-405-1463 Fax 405-8309 Geologic & Environmental Consultants Atlas Environmental Company 1 Proposed Car Wash Spill Prevention and Control Plan
Page 69
General Building Plan FIGURE 10 Dorset Circle Simsbury, Connecticut 60722 Date:9/1/26 N 90 Starr Hill Road Groton, Connecticut 860-405-1463 Fax 405-8309 Geologic & Environmental Consultants Atlas Environmental Company 2 20' 40'0 Scale Spill Prevention and Control Plan
Page 70
N FIGUREConceptual Equipment Room Layout Floor Drain Floor Slope Direction 1.5" Berm 10 Dorset Circle Simsbury, Connecticut 60722 Full 55-Gallon Drum Empty Drums 10' 20'0 Scale 90 Starr Hill Road Groton, Connecticut 860-405-1463 Fax 405-8309 Geologic & Environmental Consultants Atlas Environmental Company 3 Date: 9/1/26 Spill Prevention and Control Plan
Page 71
ATLAS ENVIRONMENTAL COMPANY Diamond Sparkle Car Wash – 10 Dorset Crossing Drive, Simsbury September 2026 SPC Plan Appendix Appendix B Facility Inspection Checklists The following checklists are to be used for monthly and semi-annual facility inspections and the annual compliance evaluation.
Page 72
ATLAS ENVIRONMENTAL COMPANY Diamond Sparkle Car Wash – 10 Dorset Crossing Drive, Simsbury September 2026 SPC Plan Appendix Monthly Inspection Checklist Item to be Inspected Potential Problems OK Not OK Observations Equipment Room Drums Signs of deterioration, cracks, or leaks Equipment Signs of deterioration, leaks, or corrosion Piping and associated appurtenances (i.e. valves, flanges) Signs of deterioration or leaks Floor Signs of a release inside the containment. Any staining outside the containment Monthly Spill Response Equipment Checklist Item to be Inspected Okay Not Okay If not Okay, describe Absorbent Pads Absorbent Socks Loose Granular Absorbent Shovel Broom Heavy Duty Disposal Bags Inspection Month/Year ___________ Signature: _______________________________ Date: _________ Name/Title: ______________________________
Page 73
ATLAS ENVIRONMENTAL COMPANY Diamond Sparkle Car Wash – 10 Dorset Crossing Drive, Simsbury September 2026 SPC Plan Appendix Annual SPC Plan Compliance Evaluation Checklist This Compliance Evaluation Checklist should be completed during the same month each year. SPC records are required to be maintained for three years. Training: Date of the last SPC training Event: Are the training records in the SPC file? Yes No Monthly Inspections: Are inspection records in the SPC file? Yes No Have all comments been addressed? Yes No Are there any recurring problems to address? Yes No Release Reporting Any reportable releases in last year? Yes No Plan Review Has the facility layout changed? Yes No Any changes in operation or maintenance? Yes No Semi-Annual Inspections: The Oil/Grit Separator, the car wash floor drains and the Spill Containment Berm will all inspected semi-annually by Facility personnel as described in the Operations and Maintenance plan for the facility Item Tested/Inspected Date Inspected OK Not OK Comments Oil/Grit Separator Spill Containment Berm Inspection Month/Year ___________ Signature: _______________________________ Date: _________ Name/Title: ______________________________
Page 74
ATLAS ENVIRONMENTAL COMPANY Diamond Sparkle Car Wash – 10 Dorset Crossing Drive, Simsbury September 2026 SPC Plan Appendix Appendix C Record of Annual Spill Prevention Training Training will be scheduled for personnel and conducted under the direction of the Facility at regular intervals to ensure adequate understanding of this SPC Plan. The training will also highlight and describe potential spill events or failures, malfunctioning components, and recently implemented precautionary measures and best practices. Personnel will also be instructed in operation and maintenance of equipment to prevent the release of car wash products and in applicable pollution laws, rules, and regulations. Facility operators and other personnel will have an opportunity during the briefings to share recommendations concerning health, safety, and environmental issues encountered during facility operations. Date Subjects Covered Instructor(s) Employees in Attendance Name Title Copy this sheet and complete a new sheet for each annual training event
Page 75
ATLAS ENVIRONMENTAL COMPANY
Diamond Sparkle Car Wash – 10 Dorset Crossing Drive, Simsbury September 2026
SPC Plan Appendix
Appendix D Plan Review Log
The Spill Response Coordinator periodically, and at least once every five years, reviews
and evaluates this SPC Plan for any change in the Facility design, construction,
operation, or maintenance of the Facility.
Spill Response Coordinator Signature Evaluation Date Amend Plan Y/N Amendment Date
Page 76
ATLAS ENVIRONMENTAL COMPANY Diamond Sparkle Car Wash – 10 Dorset Crossing Drive, Simsbury September 2026 SPC Plan Appendix Appendix E Notification Forms
Page 77
ATLAS ENVIRONMENTAL COMPANY Diamond Sparkle Car Wash – 10 Dorset Crossing Drive, Simsbury September 2026 SPC Plan Appendix Release or Spill Notification Form Part A: Release Information General information when reporting a spill to outside authorities: Name: Diamond Sparkle Car Wash – 10 Dorset Crossing Drive Address: 10 Dorset Crossing Drive Simsbury, CT Telephone: Primary Contact: Work: (860) Cell (24 hrs): (860) Type of oil: Release Date and Time: Quantity released: Discovery Date and Time: Quantity released to a waterbody: Release duration: Location/Source: Actions taken to stop, remove, and mitigate impacts of the Release: Affected media: Air Water Soil Stormwater sewer Oil/grit separator Notification person: Telephone contact: Cell: Nature of Release, environmental/health effects, and damages: Injuries, fatalities or evacuation required? Part B: Notification Checklist Date and time Name of person receiving call Release in any amount Work: (860) Cell (24 hrs): (860) Release in amount exceeding 5 gallons and not affecting a waterbody Local Fire Department 911 CTDEEP 860-424-3338 Release in any amount and affecting (or threatening to affect) a waterbody Local Fire Department 911 CTDEEP 860-424-3338 National Response Center (800) 424-8802
Page 78
1 September 1, 2026 Re: RESPONSIBILITY TO MITIGATE POLLUTION AND PROVIDE POTABLE HOUSEHOLD WATER; ROUTINE AQUIFER MONITORING The Conservation Commission, in its report to the Zoning Commission, has asked several questions, including these two: If there becomes an issue with surface water pollution, who is responsible for mitigating the issue and providing a new water supply for households? Also, is there a routine monitoring plan in place to continually check the health of the aquifer? This memorandum summarizes the principal Connecticut statutes and agency programs that address (1) who must abate pollution and replace household drinking water when a supply is contaminated, and (2) what routine monitoring exists for aquifers and related waters. It is an informational overview of publicly available law and agency guidance, not legal advice. Facts of a particular site, contaminant, and water source control the result. Surface water versus groundwater Households in Connecticut almost never drink untreated surface water. Private homes typically use wells that draw groundwater (an aquifer), or they are connected to a public water system that treats surface water, groundwater, or both. Surface-water pollution is therefore abated under the general Water Pollution Control Act. Replacement of household drinking water is governed by a more specific statute that applies when groundwater used for drinking becomes unusable. “Waters of the state” include surface waters and underground waters. See CGS § 22a-423 (definitions). (https://www.cga.ct.gov/current/pub/chap_446k.htm). Who must mitigate pollution and provide a new household water supply A. Contaminated drinking-water wells — CGS § 22a-471 The core statute is Connecticut General Statutes § 22a-471 (Pollution of groundwaters; orders to provide potable drinking water). (https://law.justia.com/codes/connecticut/title-22a/chapter- 446k/section-22a-471/ ). It is implemented by theDEEP Potable Water Program (https://portal.ct.gov/DEEP/Remediation--Site-Clean-Up/Potable-Water-Program/Potable-Water- Program). Two agency findings are required before an order issues: The Commissioner of Energy and Environmental Protection (DEEP) determines that pollution of the groundwaters has occurred or can reasonably be expected to occur; and he Commissioner of Public Health (DPH) determines that the pollution creates, or can reasonably be expected to create, an unacceptable risk of injury to the health or safety of persons using those groundwaters as a public or private source of drinking or other personal or domestic water.
Page 79
2 DPH makes the health-risk determination by balancing all relevant facts and inferences; it is not limited to statistical analysis. DPH also publishes an Action Level List used in practice to trigger further DEEP action. See DPH Action List for Drinking Water (https://portal.ct.gov/dph/environmental- health/environmental-and-occupational-health-assessment/action-list-for-drinking-water). Who can be ordered to supply water The person or municipality responsible for the pollution. DEEP may order short-term potable water and a long-term supply (public-system connection, treatment system, or another approved method). The order may require an engineering report approved by DEEP and DPH, a schedule, and ongoing maintenance and monitoring. Multiple responsible parties. DEEP shall attempt to apportion responsibility if it finds apportionment appropriate. If it does not apportion, all responsible persons and municipalities are jointly and severally responsible. The State. If a state agency or department is responsible in whole or in part, that agency must prepare or arrange an engineering report and provide or arrange a long-term potable supply. DEEP may seek reimbursement from other responsible parties. Unidentified or insolvent polluter. The municipality is the fallback. If DEEP cannot identify the responsible party, or the responsible persons have no assets other than land, buildings, business machinery, or livestock and cannot obtain a reasonable loan, DEEP may itself arrange a long-term supply, or may order the municipality where the unusable groundwater is located to provide short-term water to existing residential buildings and elementary and secondary schools, and long-term water to all persons affected. A municipality that is not itself the polluter and is ordered to provide water may apply for state grants. As funds allow, grants cover 100% of short-term provision, the engineering report, the most cost- effective long-term capital solution approved by DEEP and DPH, and the first five years of specified monitoring and maintenance of individual treatment systems and wells in an area where pollution is reasonably likely. State funds generally do not cover later operation and maintenance. See CGS § 22a- 471(b) and the implementing regulation RCSA § 22a-471-1 (https://eregulations.ct.gov/eRegsPortal/Browse/RCSA/Title_22aSubtitle_22a-471Section_22a-471-1/ ). The statute does not cut off private damage suits by people who relied on the groundwater before DEEP determined it was polluted. A municipality that spends money under an order may also sue responsible parties to recover costs. What DEEP’s Potable Water Program will and will not do The program assists people whose private or public drinking-water wells are contaminated, or at risk of contamination, as a result of human activity. If the source can be determined, the Commissioner may order the polluter to provide short-term and long-term potable water. The program does not address naturally occurring contaminants (arsenic, uranium, radon, etc.). Those cases go to DPH’s Private Well Program (https://portal.ct.gov/dph/environmental-health/private-wells ) and the local health department. DEEP is generally unable to itself deliver bottled water or install and maintain residential treatment systems except in limited program-specific settings (for example certain PFAS investigations). See DEEP Potable Water Program (https://portal.ct.gov/DEEP/Remediation--Site-Clean-Up/Potable-Water- Program/Potable-Water-Program ) and DEEP Remediation FAQs (https://portal.ct.gov/DEEP/Remediation--Site-Clean-Up/Frequently-Asked-Questions ).
Page 80
3 Surface-water pollution generally — Chapter 446k Abatement of surface-water pollution (streams, rivers, lakes, ponds, and discharges that reach them) is enforced under the Water Pollution Control Act, CGS Chapter 446k. Principal tools: Discharge permits and conditions — CGS § 22a-430. Chapter text: CGA Chapter 446k (https://www.cga.ct.gov/current/pub/chap_446k.htm ). Orders to correct a source of pollution — CGS § 22a-432. An order to a non-owner polluter may also run to the landowner; owner and polluter can be jointly and severally responsible. See CGS § 22a- 433. Cost recovery against the party that caused a spill, discharge, seepage, or similar event — CGS § 22a-451 (liability for investigation, containment, removal, monitoring, and mitigation). CGS § 22a-451 (related provisions compiled) (https://www.lawserver.com/law/state/connecticut/ct- laws/connecticut_statutes_22a-452 ). Innocent-landowner limits appear in CGS §§ 22a-452d and 22a- 452e. CGS § 22a-452e (https://law.justia.com/codes/connecticut/title-22a/chapter-446k/section-22a- 452e/ ). Water-quality standards and classifications for surface waters (Classes AA, A, B, SA, SB) — CGS § 22a-426 and implementing regulations. Class AA waters are existing or proposed drinking-water supplies and have the strictest discharge limits. RCSA § 22a-426-4 (surface-water classifications) (https://eregulations.ct.gov/eRegsPortal/Browse/RCSA/Title_22aSubtitle_22a-426Section_22a-426-4/ ). Public water systems and public-supply sources — DPH (Title 25) If households are served by a water company, that company remains responsible for delivering safe, adequate water. DPH has jurisdiction over purity and adequacy of sources used by municipalities, public institutions, and water companies. See CGS § 25-32. (https://law.justia.com/codes/connecticut/title-25/chapter-474/section-25-32/ ). DPH may order correction of conditions that immediately threaten public water supplies (CGS § 25-32g) and may act against pollution or threatened pollution of sources (CGS § 25-34). Watershed sanitation rules appear in RCSA § 19-13-B32 (https://eregulations.ct.gov/eRegsPortal/Browse/RCSA/Title_19Subtitle_19-13Section_19-13-b32/ ). A compiled overview of drinking-water protection statutes is on DPH’s site: CT Statutes and Regulations for Protection of Drinking Water Supplies (PDF) (https://portal.ct.gov/- /media/Departments-and- Agencies/DPH/dph/drinking_water/pdf/CTStatutesRegsforProtectionofDWSpdf.pdf ). Private wells — owner testing duties Owners of newly constructed private or semipublic wells must test for a specified list of parameters and submit results to DPH (CGS § 19a-37). Local directors of health may require additional testing when there are reasonable grounds to suspect naturally occurring contaminants. A certificate of occupancy generally may not be withheld solely because of private-well test results unless a public-
Page 81
4 supply maximum contaminant level is exceeded. CGS § 19a-37 (https://www.lawserver.com/law/state/connecticut/ct-laws/connecticut_statutes_19a-37 ). Is there a routine monitoring plan for aquifer health? The short answer is that it is Aquarion’s responsibility. Period. It must insure compliance with the law. There is no single statewide program that continuously samples every aquifer for chemical quality. Monitoring is layered and targeted by source type and risk. Public-supply aquifers — Aquifer Protection Area Program Connecticut’s Aquifer Protection Area Program protects major public water-supply wells in sand-and-gravel aquifers that serve more than 1,000 people. Water companies, including Aquarion, must map critical recharge areas (Level B then refined Level A mapping) and conduct well-field monitoring to warn of contamination. Municipalities appoint an aquifer-protection agency (Simsbury’s Zoning Commission), adopt land-use regulations that restrict new hazardous-material activities, and register existing regulated uses. DEEP administers the program, approves maps and local regulations, and directly regulates certain facilities. Program page: DEEP Aquifer Protection Program (https://portal.ct.gov/DEEP/Aquifer- Protection-and-Groundwater/Aquifer-Protection/Aquifer-Protection-Program ). Interactive map of designated areas is linked from that page. Strategic monitoring guidance: Strategic Monitoring Guidance Document (2001) (PDF) (https://portal.ct.gov/- /media/deep/aquifer_protection/strategicmonitoringguidancedocumentmarch2001pdf.pdf ). Public water systems — DPH monitoring schedules Community and other public water systems, i.e., Aquarion, must sample according to DPH schedules implementing the Safe Drinking Water Act (entry-point, distribution, source, and special contaminants such as PFAS). Example schedule format: DPH Drinking Water Section monitoring schedule (sample PDF) (https://portal.ct.gov/-/media/departments-and- agencies/dph/dph/drinking_water/pdf_schedules/schedules_hartford_c.pdf ). Certain water companies with wells in unconsolidated, unconfined aquifers also report groundwater levels to DPH under RCSA § 19-13-B102(n)(4). Ambient surface-water monitoring — DEEP DEEP’s Ambient Water Quality Monitoring Program Strategy (2015–2024) describes inland surface-water monitoring used for Clean Water Act § 305(b) assessments. See the strategy document: Ambient Water Quality Monitoring Program Strategy 2015–2024 (PDF) (https://portal.ct.gov/- /media/DEEP/water/water_quality_management/monitoringpubs/monstrategy20152024finalpdf.pdf ). Surface- and ground-water quality classification maps are published on Connecticut Open Data, e.g. Surface Water Quality Polygon (https://data.ct.gov/Environment-and-Natural-Resources/Surface-Water- Quality-Polygon/y87r-cmde ). Contaminated sites — required groundwater compliance monitoring
Page 82
5 Releases subject to the Remediation Standard Regulations must include groundwater monitoring designed to show that soil remedies prevent further groundwater pollution and that applicable groundwater criteria are met (typically multiple seasonal sampling rounds). See DEEP Groundwater Compliance Monitoring Fact Sheet (PDF) (https://portal.ct.gov/- /media/deep/site_clean_up/remediation_regulations/groundwatercompliancemonitoringfactsheetpdf.pdf ). Known and potentially contaminated sites are listed at List of Contaminated or Potentially Contaminated Sites (https://data.ct.gov/Environment-and-Natural-Resources/List-of-Contaminated-or- Potentially-Contaminated-S/xcxg-6jqp ). Statewide aquifer mapping and water-level networks The Connecticut Geological Survey produced a statewide Surficial Aquifer Potential (https://data.ct.gov/Environment-and-Natural-Resources/Surficial-Aquifer-Potential/rbea-jcqb ) map for planning and nonpoint-source protection. USGS maintains a cooperative groundwater-level network used for drought and resource assessment (see USGS Connecticut groundwater-network materials). These products describe resource potential and water-table behavior; they are not a substitute for chemical sampling of every aquifer. Private wells — no statewide chemical surveillance Ongoing chemical testing of existing private wells is the owner’s responsibility except where a local health director requires testing, a sale or new-well rule applies, or DEEP/DPH is investigating a known man-made release. Contacts: Farmington Valley Health District (860-352-2333; DEEP Remediation Division (860-424-3705) for man-made contamination; DPH Private Well Program (860- 509-8401) for naturally occurring contaminants. Summary of Responsibilities Situation Who acts Private well polluted by human activity DEEP orders the responsible person/municipality under § 22a-471; if none can pay, municipality (with possible state grant) or DEEP arranges supply. DPH confirms health risk. Naturally occurring well contaminant Owner, local health department, and DPH Private Well Program. DEEP Potable Water Program does not take these cases. Surface-water discharge or spill Discharger/responsible party abates under DEEP order (§§ 22a-430, 22a- 432) and is liable for cleanup costs (§ 22a-451). Public water system source Water company must deliver safe water; DPH regulates purity/adequacy and can order source-protection measures. Aquifer Protection Areas add land-use controls and well-field monitoring. Routine aquifer “health” checks Targeted, not universal: water-company well-field monitoring in Aquifer Protection Areas; DPH schedules for public systems; DEEP ambient surface-water program; site-specific RSR groundwater monitoring; USGS/DPH water-level networks. Private wells are owner-tested.
Page 83
6 Resources: 1. DEEP Potable Water Program (https://portal.ct.gov/DEEP/Remediation--Site-Clean-Up/Potable- Water-Program/Potable-Water-Program) 2. CGS § 22a-471 (https://law.justia.com/codes/connecticut/title-22a/chapter-446k/section-22a- 471/) 3. CGA Chapter 446k — Water Pollution Control (https://www.cga.ct.gov/current/pub/chap_446k.htm ) 4. DPH Action List for Drinking Water (https://portal.ct.gov/dph/environmental- health/environmental-and-occupational-health-assessment/action-list-for-drinking-water ) 5. DEEP Aquifer Protection Program (https://portal.ct.gov/DEEP/Aquifer-Protection-and- Groundwater/Aquifer-Protection/Aquifer-Protection-Program ) 6. CGS § 25-32 — DPH jurisdiction over water supplies (https://law.justia.com/codes/connecticut/title-25/chapter-474/section-25-32/ ) 7. CGS § 19a-37 — private-well testing (https://www.lawserver.com/law/state/connecticut/ct- laws/connecticut_statutes_19a-37 ) 8. DEEP Ambient Water Quality Monitoring Strategy (PDF) (https://portal.ct.gov/- /media/DEEP/water/water_quality_management/monitoringpubs/monstrategy20152024finalpdf. pdf ) 9. DEEP Groundwater Compliance Monitoring Fact Sheet (PDF) (https://portal.ct.gov/- /media/deep/site_clean_up/remediation_regulations/groundwatercompliancemonitoringfactsheet pdf.pdf) 10. 10. RCSA § 22a-471-1 — potable-water grants (https://eregulations.ct.gov/eRegsPortal/Browse/RCSA/Title_22aSubtitle_22a-471Section_22a-471- 1/ ) Submitted: Dwight Merriam on behalf of the Applicant
Page 84
DORSET CROSSING PAD LOT F - SITE DEVELOPMENT PLANS Date: 8/31/2026 Project Name: PROPOSED CAR WASH DEVELOPMENT Owner/Developer: DIAMOND SPARKLE CAR WASH Address: 10 DORSET CROSSING, SIMSBURY, CT Address: 359 LEBANON AVENUE Bond Amount: $19,700.00 SIMSBURY, CT 06415 Project No.: 00222-001 Phone # Bond Type: EROSION & SEDIMENTATION CONTROL PHASE 1 NO. ITEM DESCRIPTION QUAN. UNIT UNIT PRICE AMOUNT 1 Clearing and Grubbing 0.00 AC $3,000.00 $0 2 Anti-Tracking Pad 1.00 EA $1,500.00 $1,500 3 Sedimentation Control System 980.00 LF $6.00 $5,880 4 Sedimentation Control at Catch Basin 10.00 EA $250.00 $2,500 5 Temporary Siltation Trap 1.00 EA $2,000.00 $2,000 6 Erosion Control Blanket 0.00 SF $1.50 $0 7 Riprap / Crushed Stone Filter 8.00 CY $55.00 $440 8 Restoration of Vegetation 1,220.00 SY $6.00 $7,320 9 Mulch / Landscaping Not Included 0.00 SY $0.00 $0 TOTAL $19,640.00 BOND QUANTITIES FORM 1
Page 85
Aquarion Water Authority • 600 Lindley Street • Bridgeport, CT 06606 aquarionwater.com 203.445.7310 phone 800.732.9678 ( toll free ) August 2 8 , 2026 Rodney Goldberg Diamond Sparkle Car Wash LLC 359 Lebanon Avenue Colchester, CT 06415 Re: Request for Water Service – 10 Dorset Crossing Drive , Simsbury, Connecticut Diamond Sparkle Car Wash Dear Mr . Goldberg, This letter confirms that Aquarion Water Authority ( Aquarion ) has sufficient water supply to meet the following estimated commercial water demand for the proposed development at the above referenced property. Average Day Demand: 10,600 gallons per day Maximum Day Demand: 21,200 gallons per day Aquarion is currently approving the estimated average day demand while the water reclamation system is in service. We will be developing an operating agreeme nt in case of reclamation system failure, which will include notifying Aquarion of failure. This commitment does not include irrigation, fire hydrant, or fire sprinkler demand s because no demand projections for irrigation, fire hydrant s , or fire sprinkler s were included in the application submitted to Aquarion. If you wish to include irrigation , fire hydrant , or fire sprinkler demands in your project, you will need to update you r application and resubmit your Will Serve Letter request. This service commitment is valid for 12 months from the date of issuance. If your proposed project is not ready for water service (intended usage) within 12 months of this letter, then Aquarion’s ability to serve your project will have to be re - evaluated. While t his letter serves as a service commitme nt, it is not an approval of how or when you can connect (tap) to our water main. You must complete the New Services P rocess, including obtaining add itional approvals that are required , payment of required fees, etc. If you have any questions regarding this letter , please feel fre e to contact me at 203.362.3067. If you have questions regarding the new services process and next steps required to connect (tap) to our system, please contact our New Services Team at newservices@aquarionwater.com . Very truly yours, Aquarion Water Authority Hannah P. Swearsky Planning Engineer cc: New Services, File Attachment: Will Serve Letter Application dated 6/3/2026
Page 86
Page 87
Page 88
Minutes: archived copy, SHA-256 f9d2bc3e8dac…. Agenda: archived copy, SHA-256 9cf25b70c0d2…. Packet: kept offline, SHA-256 9769cfa8c33a….