CT Public Docs Tracker

Towns / Simsbury / Zoning Commission / Jul 20, 2026

Zoning Commission, Jul 20, 2026

Simsbury minutes posted

Documents

TypeDocumentPagesOpen
minutes Zoning Commission Regular Meeting Minutes 4 PDF download · town site
agenda Zoning Commission Regular Meeting 1 PDF download · town site
packet Zoning Commission Regular Meeting (packet)
Not attached: this packet is 78 MB, too large to host here. Use the town site link.
369 town site

Summary

Only a meeting packet is posted. Packets (the supporting documents) are archived and searchable but not summarized; open the PDF to read it.

Full text of the documents

View the minutes PDF on this page (Zoning Commission Regular Meeting Minutes) Open the PDF
Text of the minutes (Zoning Commission Regular Meeting Minutes, 4 pages)

Page 1 · open in PDF

 
 
 
 
   
   
 
 
 
Page 1 of 4 
 
Zoning Commission 1 
Regular Meeting 2 
July 20, 2026 – 7:00 P.M.  3 
Simsbury Public Library – FSPL Room 4 
725 Hopmeadow Street, Simsbury, CT 06070 5 
 6 
MINUTES 7 
 8 
I. CALL TO ORDER– Chair Braz called the meeting to order at 7:06 P.M. 9 
 10 
Present: Chair, Tony Braz Vice Chair, Shannon Leary; Commission Members: Jackie 11 
Battos, Dagny Griswold, and Tucker Salls; Alternate Commission Member s: Stacie 12 
Espeso, Allen Bradford and Doug McKown; Planning Director, George McGregor; and 13 
Assistant Town Planner, Brittany MacGilpin.  14 
 15 
Absent: Commission Member, Kate Beal. 16 
 17 
Seating of Alternates: Commissioner Espeso was appointed as a regular member for 18 
tonight’s meeting.  19 
 20 
MOTION: Commissioner Battos made a motion, seconded by Vice Chair Leary, to 21 
amend the Agenda to move Application ZC 26-20 to the first item. The motion carried 22 
unanimously (6-0-0). 23 
 24 
II. APPROVAL OF MINUTES 25 
 26 
July 6, 2026  27 
 28 
MOTION: Commissioner Salls made a motion, seconded by Commissioner Espeso, 29 
to approve the Minutes of the July 6, 2026, Regular Meeting as written. Commissioner 30 
Battos abstained. The motion carried (5-0-1). 31 
 32 
III. SITE PLAN REVIEW 33 
 34 
ZC 26 -20, An application of Craig Foreman, Owner; Darin Senna, Agent; for the 35 
installation of a 32 sq. ft. monument sign at 50 Hopmeadow Street (Assessor’s Map 36 
Block Lot E18 117 001-2) Zone PAD. 37 
 38 

Page 2 · open in PDF

Page 2 of 4 
 
Planning Director McGregor presented the proposed monument sign. Assistant Town 39 
Planner MacGilpin further discussed the recommendations  from the Design Review 40 
Board. 41 
 42 
MOTION: Vice Chair Leary made a motion, seconded by Commissioner  Salls, that 43 
the Zoning Commission approves ZC 26-20, An application of Craig Foreman, Owner; 44 
Darin Senna, Agent; for the installation of a 32 sq. ft. monument sign at 50 Hopmeadow 45 
Street (Assessor’s Map Block Lot E18 117 001-2) Zone PAD. The approval is subject 46 
to the following conditions:  47 
 48 
1. The project shall be developed in substantial conformance with the plans  received 49 
by the Planning Department 7/13/26 prepared by Hartford Sign & Design, with the 50 
conditions provided by the Design Review Board: 51 
 52 
a. Replace the red detailing with black. 53 
 54 
b. Use natural brownstone or an engineered stone veneer for the sign base. 55 
 56 
c. Replace the blue stone cap on the base with brownstone.  57 
 58 
2. Prior to building permit issuance, the applicant shall submit a landscaping plan to 59 
the satisfaction of the Planning Department. 60 
 61 
The motion carried unanimously (6-0-0). 62 
 63 
IV. PUBLIC HEARINGS and POTENTIAL ACTION ON APPLICATIONS 64 
 65 
ZC #26-18, An application of Dorset Crossing LLC, Owner, Dwight Merriam, Agent, 66 
pursuant to Section 8 of the Zoning Regulations for a zone change and amendment to 67 
the Master Development Plan to allow a car wash facility at 10 Dorset Crossing 68 
(Assessor’s Map Block Lot I04 403 13C-F), Planned Area Development (PAD) Zone. 69 
 70 
Planning Director McGregor presented  the proposed zone change and amendment to 71 
the Master Development Plan. The Planning Commission had a split vote on a negative 72 
referral based on environmental impacts. Assistant Town Planner MacGilpin further 73 
discussed the positive referral and recommendation from the Design Review Board. 74 
 75 
Attorney Dwight Merriam, FAICP, Esq.; Civil Engineer, Brandon Handfield, PE of 76 
Yantic River Consultants; Architect, Rocco Petitto, AIA, QA +M Architecture; and 93 77 
Landscape Architect, Biff Schechinger, ASLA presented the proposed including the 78 
changes recommended by the commission and public comment  given at previous 79 
meetings. The Commission asked several follow-up questions.  80 
 81 

Page 3 · open in PDF

Page 3 of 4 
 
Public Comments 82 
 83 
 Thomas Surman, 11 Charlotte Drive, Simsbury, spoke in opposition.  84 
 85 
 Nick Criscitelli (Planning Commissioner), 24 Centerwood Road, Simsbury, spoke in     86 
 opposition.  87 
 88 
Jamie Skiba, 21 Knollwood Road, Simsbury, spoke in opposition.  89 
 90 
Ashley Byros, 22 Gordon Street, Simsbury, spoke in opposition.  91 
 92 
William Otis, 22 Lucy Way, Simsbury, spoke in support.  93 
 94 
Rebecca Bellon, 55 Dorset Crossing, Simsbury, spoke in opposition.  95 
 96 
Michelle Ciccaglione, Owner of Simsbury Therapeutic Massage and Wellness, 97 
Simsbury, spoke in opposition.  98 
 99 
John Torres, 55 Dorset Crossing, Simsbury, spoke in opposition.  100 
 101 
Fred Medacordia, 7 Willard Street, Simsbury, spoke in opposition.  102 
 103 
Dr. Max Grezen, 24 Cobtail Way, Simsbury, spoke in support.  104 
 105 
Paul Chelsey, 55 Dorset Crossing, Simsbury, spoke in opposition.  106 
 107 
Robert Demeski, 20 Butternut Lane, Simsbury, spoke in opposition.  108 
 109 
Susan Vankleef, 6 Mallard Circle, Tariffville, spoke in opposition.  110 
 111 
Victoria North, 88 Hedgehog Lane, Simsbury, spoke in opposition.  112 
 113 
Lori Boyko, 15 Oakhurst Road, Simsbury, spoke in opposition.  114 
 115 
Richard Bidwell, 6 Knollwood Circle, Simsbury, spoke in opposition. 116 
 117 
Julian Weaver, 13 Willard Street, Simsbury, spoke in opposition.  118 
 119 
Sharon Byron, 17 Crestview Road, Tariffville, spoke in opposition.  120 
 121 
MOTION: Commissioner Salls made a motion, seconded by Commissioner Battos, to 122 
close the public hearing for  ZC #26-18. The motion carried unanimously (6-0-0). 123 
 124 

Page 4 · open in PDF

Page 4 of 4 
 
Chair Braz recommended referring this application to the Conservation Commission.  125 
 126 
MOTION: Commissioner Salls made a motion, seconded by Commissioner Espeso,  127 
to refer ZC #26-18, An application of Dorset Crossing LLC, Owner, Dwight Merriam, 128 
Agent, pursuant to Section 8 of the Zoning Regulations for a zone change and 129 
amendment to the Master Development Plan to allow a car wash facility at 10 Dorset 130 
Crossing (Assessor’s Map Block Lot I04 403 13C -F), Planned Area Development 131 
(PAD) Zone, to the Conservation Commission. The motion carried unanimously. (6-0-132 
0) 133 
 134 
MOTION: Commissioner Battos made a motion, seconded by Vice Chair Leary , to 135 
forward Application ZC # 26-18 and Application ZC # 26-9 to the September 9, 2026 136 
meeting. The motion carried unanimously (6-0-0). 137 
 138 
V. OTHER BUSINESS  139 
 140 
Preliminary, informal presentation for the potential redevelopment of a portion 141 
of 981-987 Hopmeadow St., Zone SC; Phil Doyle, LADA, P.C., representing the 142 
owner. 143 
 144 
Mr. Doyle presented the proposed redevelopment project for this site.  145 
 146 
VI. ADJOURNMENT 147 
 148 
MOTION: Vice Char Leary  made a motion, seconded by Commissioner B attos, for 149 
the meeting to be adjourned. The motion carried unanimously (6-0-0). 150 
 151 
Chair Braz adjourned the meeting at 9:36 P.M. 152 
 153 
Respectfully submitted,  154 
 155 
Amanda Blaze 156 
Commission Clerk 157 
View the agenda PDF on this page (Zoning Commission Regular Meeting) Open the PDF
Text of the agenda (Zoning Commission Regular Meeting, 1 page)

Page 1 · open in PDF

Zoning Commission Regular Meeting Agenda
ZC AGENDA 7-20-26.PDF
ZC 26-18 Dorset Crossing Zone Change And Master Plan Amendment
ZC 26-19 DORSET CROSSING CAR WASH MASTER PLAN CHANGE AND SITE 
PLAN STAFF MEMO W ATTACH.PDF
ZC 26-18 10 DORSET CROSSING APPLICATION AND PROJECT 
NARRATIVES.PDF
ZC 26-18 10 DORSET CROSSING ARCHITECTURAL PLANS.PDF
ZC 26-18 10 DORSET CROSSING MASTER DEVELOPMENT PLAN.PDF
ZC 26-18 10 DORSET CROSSING REVISED LANDSCAPE PLAN AND PLANT 
DETAILS.PDF
ZC 26-19 10 Dorset Crossing Car Wash Site Plan
ZC 26-19 DORSET CROSSING CAR WASH MASTER PLAN CHANGE AND SITE 
PLAN STAFF MEMO W ATTACH.PDF
ZC 26-18 10 DORSET CROSSING REVISED LANDSCAPE PLAN AND PLANT 
DETAILS.PDF
ZC 26-19 10 DORSET CROSSING ARCHITECTURAL PLANS.PDF
ZC 26-19 10 DORSET CROSSING STORMWATER MANAGEMENT 
REPORT.PDF
ZC 26-19 10 DORSET CROSSING TRAFFIC STUDY.PDF
ZC 26-19 10 DORSET CROSSING APPLICATION - REDACTED.PDF
ZC 26-18 10 DORSET CROSSING MASTER DEVELOPMENT PLAN.PDF
ZC 26-18 10 DORSET CROSSING APPLICATION AND PROJECT 
NARRATIVES.PDF
ZC 26-20 70 Hopmeadow St. Sign
ZCR 70 HOPMEADOW STREET APPLICATION.PDF
ZCR 70 HOPMEADOW STREET STAFF REPORT.PDF
981-987 Hopmeadow Street Preliminary Review
981-987 HOPMEADOW ST COMBINED PRELIMINARY PLAN SET.PDF
1.
Documents:
2.
Documents:
3.
Documents:
4.
Documents:
5.
Documents:
Text of the packet (Zoning Commission Regular Meeting (packet), 369 pages)

Page 1

Zoning Commission Regular Meeting Agenda
ZC AGENDA 7-20-26.PDF
ZC 26-18 Dorset Crossing Zone Change And Master Plan Amendment
ZC 26-19 DORSET CROSSING CAR WASH MASTER PLAN CHANGE AND SITE 
PLAN STAFF MEMO W ATTACH.PDF
ZC 26-18 10 DORSET CROSSING APPLICATION AND PROJECT 
NARRATIVES.PDF
ZC 26-18 10 DORSET CROSSING ARCHITECTURAL PLANS.PDF
ZC 26-18 10 DORSET CROSSING MASTER DEVELOPMENT PLAN.PDF
ZC 26-18 10 DORSET CROSSING REVISED LANDSCAPE PLAN AND PLANT 
DETAILS.PDF
ZC 26-19 10 Dorset Crossing Car Wash Site Plan
ZC 26-19 DORSET CROSSING CAR WASH MASTER PLAN CHANGE AND SITE 
PLAN STAFF MEMO W ATTACH.PDF
ZC 26-18 10 DORSET CROSSING REVISED LANDSCAPE PLAN AND PLANT 
DETAILS.PDF
ZC 26-19 10 DORSET CROSSING ARCHITECTURAL PLANS.PDF
ZC 26-19 10 DORSET CROSSING STORMWATER MANAGEMENT 
REPORT.PDF
ZC 26-19 10 DORSET CROSSING TRAFFIC STUDY.PDF
ZC 26-19 10 DORSET CROSSING APPLICATION - REDACTED.PDF
ZC 26-18 10 DORSET CROSSING MASTER DEVELOPMENT PLAN.PDF
ZC 26-18 10 DORSET CROSSING APPLICATION AND PROJECT 
NARRATIVES.PDF
ZC 26-20 70 Hopmeadow St. Sign
ZCR 70 HOPMEADOW STREET APPLICATION.PDF
ZCR 70 HOPMEADOW STREET STAFF REPORT.PDF
981-987 Hopmeadow Street Preliminary Review
981-987 HOPMEADOW ST COMBINED PRELIMINARY PLAN SET.PDF
1.
Documents:
2.
Documents:
3.
Documents:
4.
Documents:
5.
Documents:

Page 2

Page 1 of 2
Zoning Commission Regular Meeting 
July 20, 2026, at 7:00 PM 
Simsbury Public Library – FSPL Program Room 
725 Hopmeadow St., Simsbury CT, 06070 
AGENDA 
I. CALL TO ORDER
Seating of Alternates 
II. APPROVAL OF MINUTES 
July 6, 2026 Regular Meeting 
III. PUBLIC HEARINGS and ACTION ON APPLICATIONS
ZC #26-18, An application of Dorset Crossing LLC, Owner, Dwight Merriam, 
Agent, pursuant to Section 8 of the Zoning Regulations for a zone change and 
amendment to the Master Development Plan to allow a car wash facility at 
10 Dorset Crossing (Assessor’s Map Block Lot I04 403 13C-F), Planned Area 
Development (PAD) Zone. 
IV. SITE PLAN REVIEW
ZC 26-19, An application of Dorset Crossing LLC, Owner, Dwight Merriam, 
Agent, for a site plan approval to develop a 7,275 sq. ft. car wash facility at 10 
Dorset Crossing (Assessor’s Map Block Lot I04 403 13C-F), Planned Area 
Development (PAD) Zone. 
ZC 26-20, An application of Craig Foreman, Owner; Darin Senna, Agent; for 
the installation of a 32 sq. ft. monument sign at 50 Hopmeadow Street 
(Assessor’s Map Block Lot E18 117 001-2) Zone PAD. 

Page 3

Page 2 of 2
V. OTHER BUSINESS 
Preliminary, informal presentation for the potential redevelopment of a 
portion of 981-987 Hopmeadow St., Zone SC; Phil Doyle, LADA, P.C., 
representing the owner. 
Planning Director Report 
VI. EXECUTIVE SESSION 
The Commission may enter into Executive Session, Pursuant to General 
Statutes Section 1-200(6)(B): Discussion of Pending Litigation and/or Claim. 
VII. ADJOURNMENT 

Page 4

Marc S. Nelson, MPA George K. McGregor, AICP
Town Manager Director
PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT
933 Hopmeadow St. Tel. (860) 658-3245 
Simsbury, CT 06070 gmcgregor@simsbury-ct.gov 
STAFF REPORT MEMORANDUM 
To:  Simsbury Zoning Commission 
From: George K. McGregor, AICP 
Date:  July 20, 2026 
Subject: ZC 26-18, Dorset Crossing Zone Change/Master Plan  
ZC 26-19, 10 Dorset Crossing Site Car Wash Site Plan 
ZC #26-18, An application of Dorset Crossing LLC, Owner, Dwight Merriam, Agent, 
pursuant to Section 8 of the Zoning Regulations for a zone change and amendment 
to the Master Development Plan to allow a car wash facility at 10 Dorset Crossing 
(Assessor’s Map Block Lot I04 403 13C-F), Planned Area Development (PAD) Zone. 
ZC 26-19, An application of Dorset Crossing LLC, Owner, Dwight Merriam, Esq. 
Applicant, for a site plan approval to develop a 7,275 sq. ft. car wash facility at 10 
Dorset Crossing (Assessor’s Map Block Lot I04 403 13C-F), Planned Area 
Development (PAD) Zone. 

Page 5

2 
This staff report is a joint staff report for the zone change/master plan amendment 
and site plan.  
Master Plan Amendment/Zone Change 
Dorset Crossing is a Planned Area Development (PAD), established in 2013 with a 
mix of commercial and residential uses. The project was amended in 2022 and 2023 
and currently allows 27,000 sq.ft. of commercial and 360 multi-family residential 
homes. The development is partially constructed: 
Use Type LOT Density Constructed 
Mixed Use Retail/Medical Office A 15,000 sf Yes 
Residential Multi-Family B 168 units Yes 
Special Needs Multi-Family C 48 units Yes 
Residential Multi-Family D 30 units NO 
Mixed Use/Retail F 12,000 sf NO 
Residential Multi-Family G 42 units NO 
Residential Multi-Family H 72 units NO 
The Applicant proposes to amend the area described as “Lot F” by replacing two 
proposed buildings (12,000 sq.ft. of “retail/office”) with a 7,275 sq.ft. car wash 
facility. A “car wash” is defined separately in the zoning regulations and is not 
generally included along with other retail uses. Thus, the amendment to add the 
use constitutes a Master Development Plan change. 
Current conceptual plan alongside proposed: 
Having completed the first stage, a preliminary, non-binding review, the application 
is now a Master Plan/Zone Change application with a corresponding Site Plan. With 

Page 6

3 
this submission the Applicant requests formal review and action. The Application 
was accepted on July 6, 2026, and will be forwarded for referral to the Planning 
Commission (July 14, 2026) and the Design Review Board (July 20, 2026).  
The application is scheduled for a public hearing at the Zoning Commission on July 
20, 2026.  The master plan submission includes a site plan, traffic study, 
architectural elevations and other relevant materials. 
The property is zoned PAD and is in an Aquifer Protection District. A car wash is a 
permitted, unregulated activity in the aquifer district so long as “all waste waters 
from such activity are lawfully disposed of through a connection to a publicly owned 
treatment works.”1
Staff Review and Analysis-Master Plan Amendment 
Dorset Crossing is designated by the Plan of Conservation and Development 
(POCD) as a “Special Zone,” based on its mixed-use, Planned Area Development 
1 Aquifer Protection Area Regulation p.6 

Page 7

4 
Zoning. PADs are mixed use developments holding both residential and 
nonresidential components. The master plan for the Dorset Crossing development 
identifies this subject parcel for “retail/office” uses. An amendment allowing a car 
wash facility to be developed in lieu of retail or office is generally consistent and 
appropriate for the development. The car wash use is also consistent with the 
POCD which supports mixed-use development in this location. 
Site Plan Review 
The Applicant proposes to develop a 7,275 sq.ft. car wash facility at 10 Dorset 
Crossing. The project is subject to Section 8.1 (PAD regulations) and Section12 (Site 
Plan Regulations) of the Zoning Regulations. Accompanying and in support of the 
application the Applicant has submitted: 
 Site Plan (w/ drainage, stormwater, utilities, lighting, etc....) 
 Architectural Elevations 
 Traffic Study 
 Landscaping Plan 
 Narrative and ongoing responses to identified issues. 

Page 8

5 
The car wash proposed is a multi-faceted facility. Elements on site include an 
automated drive through car wash, separate self-service car wash bays, detailing 
options, and vacuum stations. Access to the site will be via an internal unnamed 
Dorset Crossing street; no direct access is planned to Dorset Crossing Drive or 
Hopmeadow St. 
The facility plans 24-hour operations, with the self-service bays open after the 
attended car wash tunnel closes. The Planning Commission questioned the 
necessity of being open 24 hours and the lighting impacts of such hours. The 
Applicant proposes to review these impacts after one year in operation2. 
The Applicant has submitted a traffic study detailing the impacts of the amendment 
and site plan on traffic generation and turning movements. The proposed scenario 
represents an overall reduction in trip generation from both the original approval 
and recent revisions due to the reduction in commercial and increase in residential 
units. Nonetheless, a car wash does present some challenges as the peaks traffic 
activity can vary from other commercial uses and on-site queuing must be 
considered (the queue as shown is +-18 cars). We note the Level of Service (LOS) C 
under certain turning movements. Staff asks the applicant to confirm whether 
the Level of Service C exists today or is decreased from B due to this 
application. 
The Application contains a comprehensive landscaping plan with the focus on 
supplementing screening along Hopmeadow St. Additionally, street trees and on-
site foundation plantings are offered. Native species are intended at 100%. 
Referral, Staff Review, and Analysis 
Specific review comments from individual referral agencies are attached to this 
report: 
Planning Commission-The Planning Commission will review the Application on 
July 14, 2026. During previous informal sessions the Commission requested 
information related to traffic impacts, hours of operation, water service availability, 
and drought implications over water usage  
Design Review Board-The DRB will review this application for a formal 
recommendation on July 20, 2026. During previous informal sessions, the DRB was 
broadly supportive of the architectural design and site plan. 
2 See Applicant “Car Wash Action List” #4, attached to Staff Memorandum 

Page 9

6 
Fire Marshal-The Fire Marshal has requested a widening of internal drive aisles, 
along with other options, for fire safety and access reasons. The Applicant is 
considering site revisions to meet this requested standard. 
Planning Staff-Planning Staff has requested additional information related to 
waster service capacity from Aquarion; engineering wastewater reporting; industry-
related standards for water recycling; lighting standards; wall sign information; 
hours of operation; and standard sheet information for site plan applications. Staff 
and the Applicant are working to address these issues. 
Town Engineer-The Town Engineer concurs with Planning that a wastewater 
engineering report, as required by the zoning regulations, be submitted. The Town 
Engineer, in a memo dated July 14, 2026, requested minor clarifications. No 
additional outstanding issues have been identified. 
Town Police Department-No outstanding issues identified. 
Staff and the Applicant are working to gather additional information requested and 
resolve outstanding issues. Staff and the Applicant agree on a recommendation to 
continue site plan review at the commission’s September 9, 2026, regular meeting. 

Page 10

7 
Draft Motions 
Zone Change/Master Plan Amendment 
MOVED, The Zoning Commission APPROVES Application ZC 26-18 of Dorset 
Crossing LLC, owner, Dwight Merriam Esq., applicant, for formal Application 
Review to amend the Master Development Plan at Dorset Crossing to include a Car 
Wash Facility at 10 Dorset Crossing, based on a finding that: 
The master plan for the Dorset Crossing development identifies this subject 
parcel for “retail/office” uses. An amendment allowing a car wash facility to be 
developed in lieu of retail or office is generally consistent and appropriate for 
the development. The car wash use is also consistent with the POCD which 
supports mixed-use development in this location. 
The Approval is subject to the following conditions: 
1. Zone Change/Master Plan Amendment shall be developed in substantial 
conformance to the Dorset Crossing PAD Master Development Plan dated 
April 30, 2026, REVISED June 26, 2026 
The Zone Change/Master Plan is effectively immediately, subject to the standard 
appeal period. 
OR 
Alternate Motion 
Site Plan 
MOVED, the Zoning Commission FORWARDS ZC 26-19, An application of Dorset 
Crossing LLC, Owner, Dwight Merriam, Agent, for a site plan approval to develop a 
7,275 sq. ft. car wash facility at 10 Dorset Crossing to the regular meeting on 
September 9, 2026. 
OR 
Alternate Motion 

Page 11

 
 
 
 
Marc S. Nelson, MPA  Thomas J. Roy, P.E. 
Town Manager  Director of Public Works 
  Town Engineer 
 
 
 
DEPARTMENT OF PUBLIC WORKS – ENGINEERING DIVISION 
 
 
https://ct-simsbury.civicplus.com  Mon. (8:30am-7:00pm) Tel. (860) 658-3260 
933 Hopmeadow Street Tue. Wed. Thu. (8:30am-4:30pm) Fax. (860) 658-3205 
Simsbury, CT 06070 Fri. (8:30am-1:00pm) akessler@simsbury-ct.gov 
 
MEMORANDUM 
 
To:  George K. McGregor, AICP, Dir. of Community Planning and Development 
From:  Adam D. Kessler, P.E., Deputy Town Engineer 
cc:   
Date:  July 14, 2026 
Subject: Engineering Comments - #10 Dorset Crossing 
  Proposed Diamond Sparkle Car Wash, LLC 
  ZC 26-18 & ZC 26-19 
   
 
 
The Engineering Department has reviewed the documents submitted as part of the Site Modification 
Application for the development of #10 Dorset Crossing as a Diamond Sparkle Car Wash. Documents 
were received by this department on June 30, 2026: 
1. Site plan set entitled “Dorset Crossing Pad Master Development Plan, Site Modification – Lot F”, 
prepared for Dorset Crossing LLC, prepared by YRC, dated March 20, 2025, revised through June 
26, 2026. 
2. Stormwater report entitled “Master Plan Development, Stormwater Management Report, Site 
Modification – Lot F, Proposed Diamond Sparkle Car Wash”, prepared for Diamond Sparkle Car 
Wash, LLC prepared by YRC, dated June 29, 2026. 
Applicant shall respond to all comments in writing and note any and all revisions made to the design 
plans and supporting reports. In consideration of the documents submitted as of the date of this review 
memorandum, we offer the following: 
1. Please copy this office with all permit applications submitted to state agencies related to this 
project. 
2. Please provide final construction plans for the record and reference during construction. 
3. Provide a turning movement study to demonstrate acceptable site access for fire apparatus.  
4. Provide details related to the proposed improvement including but not limited to pavement 
sections, drainage and utilities. 
5. Provide an inspection report of the existing drainage infrastructure that will receive runoff from 
this development. Pre‐construction inspection will provide a baseline condition of the existing 

Page 12

Engineering Comments 
May 5, 2026 
Page 2 of 2 
 
system to ensure all parties, including the Town, are aware of the condition. It is recommended 
to remove any accumulated sediment or debris from existing structures downstream of the 
improvements before construction and following construction. 
6. Please review Table 3 of the Traffic Impact Statement for accuracy. The SB Thru Queue during 
the Saturday Peak Hour is “#572”. Is this an error? Or does the “#” symbol refer to a note 
elsewhere in the report? 
7. While the level of service at the Dorsett Crossing intersection with Hopmeadow Street remains 
acceptable, the level of service degrades with each new development. Please note that 
additional development in the future may require further study of traffic impacts and 
mitigations to maintain LOS C or better. 
8. Facility connection charge and permit from the Simsbury WPCA are required to connect to the 
existing sanitary sewer lateral.  

Page 13

Archived: Tuesday, July 14, 2026 8:04:36 AM
From: Patrick T. Tourville, CFI I 
Sent: Thu, 2 Jul 2026 11:20:12
To: McGregor George 
Subject: Re: ZC 26-18 10 Dorset Crossing Master development plan
Importance: Normal
Sensitivity: None
External sender <ptourville@simsburyfd.org> 
Make sure you trust this sender before taking any actions.
Fire Department access roads need to be 20 feet wide. The roads around perimeter are only 13 feet, and the entry shows 18
feet per lane. If the main entry exit is not blocked with any islands or barriers this would be ok.  
Patrick Tourville CFI-I
Fire Marshal
Chief of Fire Prevention
Simsbury Fire District 
871 Hopmeadow Street
Simsbury, CT 06070
Office  860.658.1973
Cell 860.818.0479
From: McGregor George <gmcgregor@simsbury-ct.gov>
Sent: Wednesday, July 1, 2026 10:21 AM
To: Patrick T. Tourville, CFI I <PTourville@simsburyfd.org>; nboulter <nboulter@pd.simsbury-ct.gov>; Davis Chris
<cdavis@pd.simsbury-ct.gov>
Subject: ZC 26-18 10 Dorset Crossing Master development plan
 
Attached are relevant info for the FINAL Master Plan Site Plan for the Car Wash.
 
If you have comments please provide by Friday July 10.
 
I am waiting on a electronic traffic study and will forward when I get.
 
George
 
 
 
George K. McGregor, AICP
Planning & Community Development Director
Town of Simsbury
933 Hopmeadow Street
Simsbury, CT 06070
P(860) 658 3252
gmcgregor@simsbury-ct.gov

Page 14

         
The Planning and Community Development Department has been made aware of fraudulent emails containing false
invoices for land use applications.  If you receive a suspicious email, we urge you to contact us at 860-658-3252.
 

Page 15

Archived: Tuesday, July 14, 2026 8:04:47 AM
From: Davis Chris 
Sent: Mon, 13 Jul 2026 15:57:11
To: McGregor George Boulter Nicholas (SPD) 
Subject: RE: car was site plan and traffic study
Importance: Normal
Sensitivity: None
Warning: Unusual sender <cdavis@pd.simsbury-ct.gov> 
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.
I don’t have any concerns with it.
 
Thank you!
 
 
____________________
Christopher A. Davis
Deputy Chief of Police
Simsbury Police Department
(860) 658-3104
 
       
 
From: McGregor George <gmcgregor@simsbury-ct.gov> 
Sent: Monday, July 13, 2026 11:17 AM
To: Boulter, Nicholas <NBoulter@pd.simsbury-ct.gov>; Davis Chris <CDavis@pd.simsbury-ct.gov>
Subject: car was site plan and traffic study
 
Y o u  g u y s  h a v e  a n y  c o m m e n t s  o n  t h is  a p p lic a t io n ?  I  s e n t  in f o   t w o  w e e k s  b a c k  o r  s o    G e o r g e  K .  M c G r e g o r ,  A I C P  P la n n in g  &  C o m m u n it y  D e v e lo p m e n t  D ir e c t o r  T o w n  o f  S im s b u r y  9 3 3  H o p m e a d o w  S t r e e t  S im s b u r y ,  C T  0 6 0 7 0  P ( 8 6 0 )  6 5 8  3 2 5 2  g m c g r e g o r @ s im s b u r y - c t . g o v   
External sender <gmcgregor@simsbury-ct.gov> 
Make sure you trust this sender before taking any actions.
You guys have any comments on this application? I sent info  two weeks back or so
 
George K. McGregor, AICP
Planning & Community Development Director
Town of Simsbury
933 Hopmeadow Street
Simsbury, CT 06070
P(860) 658 3252
gmcgregor@simsbury-ct.gov
 
         

Page 16

The Planning and Community Development Department has been made aware of fraudulent emails containing false
invoices for land use applications.  If you receive a suspicious email, we urge you to contact us at 860-658-3252.
 

Page 17

Car Wash Action List 2026-07-09 
1. The zoning use list definition asks for a “report from a professional engineer on the 
disposal and impact of wastewater and cleaning products…” I find no such report in the 
submission. 
Client has engaged an expert consultant. 
2. The plan set labeled “PAD” Submission contains sheets generally used for a site plan 
submission. Is the plan to use this PAD submission for the site plan as well? I have asked 
Town Engineering for their input on this. It shall meet Section 11. 
Yes, we have assumed that the master plan amendment typically includes the site 
plan, but it may be better for the town and the applicant if there is a separate site plan 
application later after receipt of additional information requested from others.. 
Addressing Section 11 requirements may have to come later. 
3. There is a document labeled “PAD Master Plan Submission; Development Narrative” 
which starts with a “9. “ Entry related to landscaping. This item appears isolated and is 
perhaps part of a larger document? It is unclear. 
Resolved. 
4. Hours of operation. As discussed during preliminary review and raised by the Planning 
Commission, please confirm intended hours of operation for all services on site. Also, 
please address site lighting impacts as it relates to hours of operation. 
If the self-service car wash operation is to be open after the attended car wash tunnel is 
closed, some lighting will remain on. The reduction in lighting is indicated on the site plans. 

Page 18

As to hours of operation, many people are on shift work, particularly in health services 
where they are 24/7 and employees go in and out day and night. The experience in 
Colchester is that 15% of customers use the facility between 11 PM and 5 AM.  
The proposal is to be open 24/7 with a condition requiring the developer to return one year 
after commencing operations for a review of the lighting and the operation. 
The developer will pay the cost of an independent lighting consultant and planner or traffic 
engineer to review the lighting and the impact of the operation. 
If 24/7 operations are unsatisfactory to the Zoning Commission in its sole discretion, the 
approval would be amended to limit the hours of operation to 5 AM to 11 PM with the site 
fully shut down from 11:00 PM to 5:00 AM. 
With that year of experience, the developer can adjust the lighting to provide safe access 
while minimizing the light and have the operating experience to assess the extent to which 
the public need is being met with no adverse impacts.
5. As raised during the PC review, please address water usage and service availability from 
Aquarion High usage is a concern of commissioners. 
A request was made to Aquarion to confirm the availability to service the proposed 
use. They have not responded. They have said they will be providing a 1.5-inch service 
from the 4-inch line. 

Page 19

6. Please provide a broader description and narrative related to proposed water recycling 
efforts as they relate to industry standards and best practices. The stated commitment 
to 30-40 percent seems low. 
An expert consultant has been engaged to provide the requested information. The 
developer is awaiting information from the equipment provider.  
7. Traffic Study includes the Hotel. It is not part of the Dorset Crossing PAD, but I guess can 
be helpful vis a vis comparison for trip generation under different scenarios. 
The traffic engineer agrees it is useful information. 
8. Please specify the color temperature of the pole lights proposed and adjust the shielding of the 
fixtures at the northern property line. They are limited to 3,000 Kelvin and cannot measure 
more than 0.5 FC at the property line under the outdoor lighting regulations.
See Lighting Statement 2 and Note 1. The specified lights are 3000K.  As for the 0.5 fc at the 
property line, a question is raised as to its applicability in a  PAD with common lot lines where the 
abutter and driveway lights are physically on our property and illuminating other properties.
9. Please confirm no signs are proposed currently. If wall signs or freestanding signs are intended, 
please provide appropriate plans and specifications.
Wall signs are as shown on the site plan and architectural renderings. Details on 
materials and lighting are forthcoming.  There is a freestanding sign facing Dorset 
Crossing Drive; details forthcoming. 
Added items: 
1. Fire marshal’s drive lane widths. 
Redesign in process.  

Page 20

Page 21

1
Diamond Sparkle Car Wash at Dorset Crossing 
Master Plan Change, Text Amendment, and Site Plan
This is the final step of the three-part process for approving a new use in the Dorset Crossing 
Planned Area Development (PAD) zone.
The proposal is to amend the Master Development Plan at Dorset Crossing and approve a site 
plan to enable development of a car wash at 10 Dorset Crossing, (Assessor’s Map Block Lot I04 403 
13C-F), Planned Area Development (PAD) zone. The parcel is known as Lot F.
In 2013, Dorset Crossing was approved as a Planned Area Development (PAD) with a mix of 
commercial and residential uses. The project mix was amended in 2022 and 2023 and currently allows 
27,000 sq. ft. of commercial and 360 multi-family residential homes.
The application proposes to amend the PAD zoning for “Lot F” to replace the current two- 
building, 12,000 sq. ft. of “retail/office” concept (approved but never developed) with a substantially 
smaller 7,275 sq. ft. car wash facility. 
A car wash is a permitted use as required by Section 8.1C of the PAD regulations: 
A. Permitted Uses
Any use(s) permitted as of right or by Special Permit or Special Exception in the Simsbury Zoning 
Regulations are eligible for inclusion in a PAD and may be permitted in a Planned Area 
Development Zone. Such uses may be combined in a Mixed Use Development in accordance with 
the Development Plan Standards set forth in this Section.

Page 22

2
The car wash use is a marked improvement over the current approved use in nearly every  
respect:
1. The access plan will eliminate the curb cut on Dorset Crossing Drive, 
eliminating the conflict in turning movements with the existing driveway.
2. The impervious surface is reduced by nearly 12%.
3. The number of parking spaces required is greatly reduced. 
4. The landscaping will have 100% native vegetation. 
5. The side yard in the current use is 9 feet; the proposed use has over 50 feet.  
6. The front yard for the building in the current approved use is a scant 9 feet; 
the  car wash is 60 feet, nearly 7 times greater.
7. The building area is reduced by over 40%.
8. Even with the proposed hotel, on the adjacent parcel, the combined 
development traffic is still below the original approved peak hour volumes 
of the originally approved development
The proposed car wash is consistent with the Plan of Conservation and Development and 
meets the demand in market area of a car wash utilizing the latest technology and providing unequaled 
customer service.  It is an important and needed use for the many, and an increasing number of, 
residents in Simsbury living in multifamily developments. 
And, finally, and perhaps of overarching merit for this proposal, is the design, not only in the 
site engineering aspects noted above in terms of reducing the impact over the existing, approved use 
of Lot F, but the exceptionally attractive architectural design by a preeminent area firm, decidedly not 
the typical “out-of-the-box” design that comes with the car wash franchise operations with hundreds 
of the same car washes, all the same.  This unique, site-specific, sensitive to its neighbors, and 
technology supporting design is nonpareil.
June 30, 2026

Page 23

Page 24

A3.01
A3.1
2
A3.0 2
A3.1
1
30' - 0"15' - 0"22' - 0"14' - 8"11' - 4"
6' - 0"
4' - 0"
45' - 0" 38' - 0" 24' - 0"
2' - 0" 6' - 0"
10' - 0" 26' - 0" 19' - 0" 70' - 0"
30' - 0"15' - 0"EQEQ14' - 8 1/2"25' - 4"
125' - 0"
107' - 0"
4' - 8"
AUTOMATIC SOFT TOUCH
AUTOMATIC TOUCHLESS
OVERSIZE SELF-
SERVICE
SELF-SERVICE
DETAILING BAYS
EQUIPMENT ROOM
OFFICE
22' - 2"
29' - 2"
N
195 Scott Swamp Road
Farmington, CT 06032
qamarch.com
Issue Dates:
Project #:
NOT FOR CONSTRUCTION 
ISSUED FOR REVIEW ONLY
E:\REVIT LOCAL\DSCW Mdl2_rpetitto.rvt6/29/2026 4:32:20 PM
A1.1
FIRST FLOOR PLAN
MUNICIPAL REVIEW
05.04.2026
QAM25090
DIAMOND
SPARKLE CAR
WASH
PROJECT DESCRIPTION:
SIMSBURY, CT
Revisions

Page 25

8 1/2" / 1'-0" 8 1/2" / 1'-0"
1'-1" / 1'-0"
1'-1" / 1'-0"
8 1/2" / 1'-0"8 1/2" / 1'-0"
8 1/2" / 1'-0"
8 1/2" / 1'-0"8 1/2" / 1'-0"
8 1/2" / 1'-0" 8 1/2" / 1'-0"
1'-1" / 1'-0"
1'-1" / 1'-0"
1'-1" / 1'-0"
1'-0" / 1'-0"1'-0" / 1'-0"
1'-1" / 1'-0"
9" / 1'-0"
9" / 1'-0"
ARCHITECTURAL ASPHALT SHINGLES
ALUMINUM GUTTER TYP
ALUMINUM GUTTER TYP
ALUMINUM GUTTER TYPALUMINUM GUTTER TYP
ALUMINUM GUTTER TYP
ARCHITECTURAL ASPHALT SHINGLES
ARCHITECTURAL ASPHALT SHINGLES
STANDING SEAM METAL ROOFING
N
195 Scott Swamp Road
Farmington, CT 06032
qamarch.com
Issue Dates:
Project #:
NOT FOR CONSTRUCTION 
ISSUED FOR REVIEW ONLY
E:\REVIT LOCAL\DSCW Mdl2_rpetitto.rvt6/29/2026 4:32:23 PM
A1.4
ROOF PLAN
MUNICIPAL REVIEW
05.04.2026
QAM25090
DIAMOND
SPARKLE CAR
WASH
PROJECT DESCRIPTION:
SIMSBURY, CT
Revisions
1/8" = 1'-0"A1.4
1 ROOF PLAN

Page 26

ARCHITECTURAL ASPHALT SHINGLES
ALUMINUM GUTTER TYP
STANDING SEAM 
METAL ROOFING
WHITE PVC TRIM TYP
WHITE PVC TRIM TYP
SPLIT FACED CMU TYP
BOARD AND BATTEN 
VINYL SIDING AT 
GABLE INSETS TYP
HARDIE CLAPBOARD 
SIDING
BOARD AND BATTEN 
VINYL SIDING AT 
GABLE INSETS TYP
ALL SIGNAGE 
SHOWN AT 1'6" HIGH
TO MIDPOINT
26' - 7" FROM GRADE
ARCHITECTURAL ASPHALT SHINGLES
ALUMINUM GUTTER TYP
STANDING SEAM 
METAL ROOFING
WHITE PVC TRIM TYP
WHITE PVC TRIM TYPSPLIT FACED CMU TYP
BOARD AND BATTEN 
VINYL SIDING AT 
GABLE INSETS TYP
HARDIE CLAPBOARD 
SIDING
BOARD AND BATTEN 
VINYL SIDING AT 
GABLE INSETS TYP
ALL SIGNAGE 
SHOWN AT 1'6" HIGH
14' - 0" TYP
N
195 Scott Swamp Road
Farmington, CT 06032
qamarch.com
Issue Dates:
Project #:
NOT FOR CONSTRUCTION 
ISSUED FOR REVIEW ONLY
E:\REVIT LOCAL\DSCW Mdl2_rpetitto.rvt6/29/2026 4:32:25 PM
A3.0
ELEVATIONS
MUNICIPAL REVIEW
05.04.2026
QAM25090
DIAMOND
SPARKLE CAR
WASH
PROJECT DESCRIPTION:
SIMSBURY, CT
Revisions
1/8" = 1'-0"A3.0
1 ENTRY (EAST)
1/8" = 1'-0"A3.0
2 EXIT/DETAIL BAY (WEST)

Page 27

ENTER ENTER ENTER EXIT
ARCHITECTURAL ASPHALT SHINGLES
ALUMINUM GUTTER TYP
STANDING SEAM 
METAL ROOFING
WHITE PVC TRIM TYP
WHITE PVC TRIM TYPSPLIT FACED CMU TYP
BOARD AND BATTEN 
VINYL SIDING AT 
GABLE INSETS TYP
HARDIE CLAPBOARD 
SIDING
BOARD AND BATTEN 
VINYL SIDING AT 
GABLE INSETS TYP
ALUMINUM STOREFRONT TYP
ENTEREXIT
ARCHITECTURAL ASPHALT SHINGLES
ALUMINUM GUTTER TYP
STANDING SEAM 
METAL ROOFING
WHITE PVC TRIM TYP
WHITE PVC TRIM TYPSPLIT FACED CMU TYP
HARDIE CLAPBOARD 
SIDING
BOARD AND BATTEN 
VINYL SIDING AT 
GABLE INSETS TYP
ALUMINUM STOREFRONT TYP
WHITE PVC 
TRIM TYP
N
195 Scott Swamp Road
Farmington, CT 06032
qamarch.com
Issue Dates:
Project #:
NOT FOR CONSTRUCTION 
ISSUED FOR REVIEW ONLY
E:\REVIT LOCAL\DSCW Mdl2_rpetitto.rvt6/29/2026 4:32:27 PM
A3.1
ELEVATIONS
MUNICIPAL REVIEW
05.04.2026
QAM25090
DIAMOND
SPARKLE CAR
WASH
PROJECT DESCRIPTION:
SIMSBURY, CT
1/8" = 1'-0"A3.1
2 TOUCHLESS/SELF SERVICE BAY (NORTH)
1/8" = 1'-0"A3.1
1 OFFICE/MECH ROOM (SOUTH)
Revisions

Page 28

S
S
S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
WG
WG
WG
WG
WG
S
WG
GG
WG
S
W
S
WG
S
S
GG
S
?
EE
WG
SEE NOTE #3
LINE
PROPERTY
FORMER
2622
CL&P
2623
CL&P
234
CL&P
3572
CL&P
4362
SNET
235
CL&P
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
C
C
C
FLAG POLE
D
G
A
TE
GRAVEL DRIVE
CONC. WALK
CONC. WALK
connection (typ.)
access/roadway 
Possible future 
connection (typ.)
access/roadway 
Possible future  
Total 24 Apartments 3 Story
BUILDING #4
Mixed Use Retail/Medical Office
Total 15,000 Square Feet 1 Story
BUILDING #2 30
40
13A
Total 24 Apartments
3 Story
BUILDING #5
50
Total 24 Apartments 3 StoryBUILDING #6
70
Signal
Traffic
VE
DR
IVE
W
A
Y
DRIVE
SAX
TO
N
B
R
OOK
DR.
ROAD
C
IRCLE
K
N
O
L
LW
O
O
D
C
E
N
T
E
R
-
W
O
O
D
R
D
.
WILLARD
GORDON
ST.
ST.
ELY
LANE
Saxton
Hoskins
ROAD
WESCOTT
ROAD
Brook
R
IVE
R
S
T
A
T
E
O
F
C
O
N
N
E
C
T
IC
U
T
315
W
E
S
T
WE
K
IL
BO
U
R
N
HO
W
A
R
D
S
T
.
R
D
.
(I
NA
C
T
IV
E
)
HOSKINS
SIMSBURY
AIRPORT
TULLER
DR.
WOLC
O
TT
SIMSBURY PINES
L
AU
R
IE
-
J
O
E
W
AY
47.02
47.45
47.54
47.93
48.04
48.21
0.85
0.92
1.04
1.3
EGDIRBRETSAC GNISSORC
TESROD CROSSING
S
T
R
E
E
T
47.61
47.71
DATE DESCRIPTION
                                                     
PROFESSIONAL SEAL
SHEET
DATE
REVISED
 4/30/26
 6/26/26
OFCONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
   1 6   
REVISION SUMMARY
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
PREPARED FOR
SCALE:   1" =    40'
PROJECT NUMBER:
00222 - 001  
 40 0  40  80  120
           DIAMOND SPARKLE CAR WASH LLC           
                359 LEBANON AVENUE                
               COLCHESTER, CT 06415               
                                                  
                                                  
                                                  
                DORSET CROSSING LLC               
                30 DORSET CROSSING                
                SIMSBURY, CT 06070                
                            SIMSBURY, CT
             DORSET CROSSING PAD            
           MASTER DEVELOPMENT PLAN          
                     PREPARED FOR                     
        DIAMOND SPARKLE CAR WASH LLC, APPLICANT       
                 TITLE SHEET                
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)        
DORSET          CROSSING          DRIVEMAP REFERENCES:
HO
P
M
E
ADO
W
 S
T
R
EET
 (C
T
 R
OU
TE
 10
 &
 202
)
BUILDING #1
CAR WASH
TOTAL 7,275 SF±
1 STORY
LOT A
67 SPACES
LOT F
LOT H
148 SPACES
INDEX OF SHEETS
TITLE SHEET                                                                         01    
       MASTER DEVELOPMENT PLAN      
SCALE:   1" =  1000'
                     APPLICANT                                                                                             OWNER                      
SCALE:   1" =  1000'
      ZONING LOCATION MAP     
       SITE LOCATION MAP      
DESCRIPTION SHEET NUMBER
DEVELOPMENT LAYOUT PLAN - LOT F                                                     02    
GRADING & DRAINAGE PLAN                                                             03    
UTILITY PLAN                                                                        04    
LIGHTING PLAN                                                                       05    
EROSION & SEDIMENTATION CONTROL PLAN                                                06    
                                                                                          
                                                                                          
                                                                                          
                                                                                          
                                                                                          
                                                                                          
         DORSET CROSSING PAD        
                  SITE MODIFICATION - LOT F                 
     10 DORSET CROSSING (M/B/L I04/403/13C-F)     
               SIMSBURY, CONNECTICUT              
LOT F
SITE
(HATCHED)
NDDB AREA
APA LIMIT
PAD
SITE
10
TOWN ROAD MAP OBTAINED FROM THE CONNECTICUT DEPARTMENT OF TRANSPORTATION DATABASE.4.
ADMINISTRATION (NOAA) OF THE US DEPARTMENT OF COMMERCE DATABASE.
ELEVATION DATA OBTAINED FROM MAP REFERENCE 1 AND NATIONAL OCEANIC AND ATMOSPHERIC3.
ORTHOIMAGERY SPRING 2025 FROM NEARMAP.2.
HESKETH & ASSOCIATES, INC.
DATE: 09-16-2011 AS REVISED THROUGH 10/10/11, SCALE: 1" = 40', SHEET UT-1, PREPARED BY F.A.
"UTILITY PLAN PREPARED FOR DORSET CROSSING, HOWMEADOW STREET, SIMSBURY, CONNECTICUT"2.
09-22-2023, SCALE: 1" = 100', PREPARED BY F.A. HESKETH & ASSOCIATES, INC.
DORSET CROSSING DRIVE, SIMSBURY, CONNECTICUT", DATE: 12-03-2021 AS REVISED THROUGH
"DORSET CROSSING PAD, MASTER DEVELOPMENT PLAN PREPARED FOR DORSET CROSSING, LLC,1.
16 SPACES

Page 29

S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
WG
S
S
GG
S
?
2622
CL&P
2623
CL&P
234
CL&P
3572
CL&P
4362
SNET
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
E
E
C
C
T
FLAG POLE
D
CONC. WALK
                            SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE:   1" =    20'
PROJECT NUMBER:
00222 - 001  
 20 0  20  40  60 
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION                       
SHEET
DATE
REVISED
 4/30/26
 6/26/26
OF   2 6   
REVISION SUMMARY
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
             DORSET CROSSING PAD            
           MASTER DEVELOPMENT PLAN          
                     PREPARED FOR                     
        DIAMOND SPARKLE CAR WASH LLC, APPLICANT       
       DEVELOPMENT LAYOUT PLAN - LOT F      
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)        
LP
LP
L
P
L
P
LP
LP
L
P
L
P
LP
LP
LP
LP
LP
VAC
VAC
VAC
VAC
H
O
P
M
E
A
D
O
W
 S
T
R
E
E
T
 (C
T
 R
O
U
T
E
 10 &
 202)
DORSET          CROSSING          DRIVE
V
A
C
V
A
C
V
A
C
V
A
C
V
A
C
V
A
C
V
A
C
EQUIPMENT
OFFICE
AUTOMATIC TUNNEL
TOUCHLESS
SELF 1
SELF 2
PLANNED AREA DEVELOPMENT (PAD)ZONE:
CAR WASHUSE: 
50.6' SY
MATCH APPROVED
PARKING/DRIVE SETBACK
5'
10'
MATCH APPROVED
PARKING/DRIVE SETBACK
21.8' R
Y
AND ACCESS PLAN HAS BEEN APPROVED.
PARKING SIDE AND REAR YARD SETBACKS MAY BE REDUCED TO 0 FEET WHERE A UNIFIED PARKING2.
APPROVED INFORMATION OBTAINED FROM MAP REFERENCE 1, SHEET MA-1.1.
ZONING NOTES:
10'
10'
10'
45'-0"
25'-4"
25'-4"
38'-0"
11'-4"
24'-0"
70'-0"
6'-0"
22'-0"
10'-0"
45'-0" 30'-0"
26'-0"
19'-0"
15'-0"
11'-4"
14'-8"
22'-0"
2'-0"
6'-0"
COMPLIES< 40 FTUNKNOWN40 FTBLDG. HEIGHT
REDUCTION35,426 SF40,000 SFN/AIMP. COVERAGE
INCREASE7,275 SF7,000 SFN/ABLDG. COVERAGE
REDUCTION7,275 SF12,000 SFN/ABLDG. AREA
NO CHANGE5 FT5 FT10 FTREAR YARD[2]
NO CHANGE5 FT5 FT10 FTSIDE YARD[2]
NO CHANGE10 FT10 FT10 FTFRONT YARD
PARKING SETBACKS
COMPLIES21.8 FT±21.1 FT±20 FTREAR YARD
N/AN/AN/A10 FTACCESSORY
COMPLIES50.6 FT±9.0 FT±20 FTPRINCIPAL
SIDE YARD
COMPLIES23.7 FT±20 FTCANOPY
COMPLIES60.8 FT±20.0 FT±20 FTBUILDING
FRONT YARD
NO CHANGE460.7 FT±460.7 FT±100 FTLOT FRONTAGE
NO CHANGE47,419 SF (1.08 AC)47,419 SF (1.08 AC)10,000 SFLOT AREA
NOTESPROPOSEDAPPROVED[1]REQUIREDITEM
2'
PARKING/DRIVE SETBACK
5.67'
10'
10'
10'
10'
10'
10'
10'
10'
16'
16'
62.4' SY
60.8' F
Y
 M
A
IN
 B
U
IL
D
IN
G
A
B
C
D
E
F
G
H
I
J
LEGEND
K
L
Mixed Use Retail/Medical Office
Total 15,000 Square Feet
1 Story
BUILDING #2
CONNECTION (TYP.)
ACCESS/ROADWAY
POSSIBLE FUTURE
A
24'
18'
18'
13'
15'
13'
21.33'
13'
A
A
A
A
21.33' A
A
2'
18'
B
B
B
C
D
G
G
G
G
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
G
G
H
I
J
TRASH ENCLOSURE
STOP SIGN
HANDICAP PARKING SIGN
HANDICAP RAMP (8.33% MAX.)
CONCRETE SIDEWALK
CONCRETE CURB & WALK MONO.
EXT. CONCRETE CURB (START/END)
BIT. CONCRETE CURB (START/END)
STOP BAR (12" WHITE)
LANE STRIPING (4" WHITE)
PARKING PAINT STRIPING (4" WHITE)
BITUMINOUS CONCRETE DRIVE
K
L
E
X
IS
T
IN
G
 D
R
IV
E
W
A
Y
AREA = 750 SF±
CANOPY LIMITS
PAY STATION
LIGHT FIXTURE (TYP. OF 12)
15' HIGH POLE MOUNTED
EXISTING LIGHT FIXTURE (TYP.)
HANDICAP PARKING MARKING
WALL PACK (FULL CUTOFF)
POLE MOUNTED LIGHT FIXTURE
HAYBALE
SILT FENCE
TELECOMMUNICATIONS
ELECTRIC
GAS SERVICE
WATER
SANITARY SEWER
CURTAIN/SLOPE/WALL DRAIN
ROOF LEADER
DRAINAGE PIPE
CONCRETE WALK & CURB MONO.
CONCRETE WALK
SAWCUT PAVEMENT
EDGE OF PAVEMENT W/ CURB
14'-8"
4'-0"
DETAIL
DRAINAGE EASEMENT
EASEMENT
EASEMENT
FAVOR OF CL&P
EASEMENT IN
OF AQUARION
EASEMENT IN FAVOR
TOWN OF SIMSBURY
EASEMENT IN FAVOR OF
8'
8'
9'
9'
9'
13'
A
A
5 S
P
A
C
E
S
 (V
A
C
.)
4 SPACES (VAC.)
18'
COMPLIES1 SP (1 VAN)1 SP (1 VAN)161 SP / 1-25 SPDEVELOPMENT TOTAL
ACCESSIBLE PARKING
COMPLIES16 SPACES5 SPACESTOTAL
11 SPACESN/AN/AN/APATRONS / VACUUM
3 SPACES3 SPACES31 SP / EMP.CAR WASH
2 SPACES2 SPACES2722.5 SP / 500 SFOFFICE
PARKING SPACES
NOTESPROPOSEDREQUIREDUNITSTANDARDITEM
GENERAL SITE NOTES
ACCESSIBLITY REQUIREMENTS.
CONTRACTOR TO CONFIRM WITH LOCAL CODES AND BUILDING INSPECTOR FOR SPECIFIC HANDICAPPED10.
COMPACTION.
GRANULAR BACKFILL. REFER TO GEOTECHNICAL REPORT FOR TYPE OF FILL TO ACHIEVE DESIRED
CONTRACTOR SHALL COMPLETELY FILL ALL TRENCHES WITHIN 5 FEET OF PAVEMENT EDGES WITH9.
TO THE OWNER.
CONSTRUCTION BY THE CONTRACTOR, HIS SUBCONTRACTORS OR SUPPLIERS AT NO ADDITIONAL COST
CONTRACTOR SHALL REPAIR, RESURFACE, RECONSTRUCT OR REFURBISH ANY AREAS DAMAGED DURING8.
ASPHALT. 
WITH FORM 819, TOWN OF SIMSBURY OR DOT STANDARDS WHERE NEW ASPHALT JOINS EXISTING
CONTRACTOR SHALL SEAL EDGE OF EXISTING ASPHALT PAVEMENT WITH TACK COAT IN ACCORDANCE7.
PROJECT LANDSCAPE ARCHITECT.
SEED SHALL BE APPLIED AT THE MINIMUM RATE RECOMMENDED BY THE MANUFACTURER OR THE
CONTRACTOR SHALL SUPPLY AND PLACE STRAW MULCH WHEREVER GRASS SEED HAS BEEN PLACED.6.
1" BELOW TOPS OF CURBS, WALKS, OR PAVEMENT ELEVATIONS WHERE TOPSOIL ABUTS THOSE AREAS.
OR AS DIRECTED BY THE PROJECT LANDSCAPE ARCHITECT.  TOP OF TOPSOIL LAYER SHALL BE PLACED
OTHERWISE NOTED. ALL NEW SEEDED OR SODDED AREAS SHALL HAVE A TOPSOIL LAYER OF 4" MINIMUM
ALL DISTURBED AREAS SHALL BE SEEDED OR SODDED AFTER FINISH GRADING IS COMPLETED UNLESS5.
FEATURES AS NECESSARY.
CONTRACTOR SHALL PROVIDE SMOOTH TRANSITIONS FROM PROPOSED FEATURES TO EXISTING4.
REPRESENTATIVE IMMEDIATELY.
DISCREPANCIES BETWEEN THE PLANS AND ACTUAL FIELD CONDITIONS TO THE OWNER OR OWNER'S
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS AND SHALL REPORT ANY
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO THE START OF CONSTRUCTION.3.
OR OTHER LIMITS AS DEPICTED ON THE PLAN.
ALL DIMENSIONS ARE TO THE EDGE OF PAVEMENT, FACE OF CURBS, OUTSIDE FACE OF THE BUILDING2.
CONSTRUCTION FORM 819 AS APPLICABLE AND THE TOWN OF SIMSBURY STANDARD SPECIFICATIONS.
TRANSPORTATION STANDARD SPECIFICATIONS FOR ROADS, BRIDGES, FACILITIES AND INCIDENTAL
ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE STATE OF CONNECTICUT DEPARTMENT OF1.
23.7' F
Y
 C
A
N
O
P
Y
63.0' F
Y
 M
A
IN
 B
U
IL
D
IN
G
18'
24'
15.5'
F
H
5'
4'
10'
FF = 201.50
AREA = 7,275 SF±
CAR WASH
1 STORY
BUILDING #1
DESIGN BY OTHERS
MONUMENT SIGN
DIAMOND SPARKLE
ZONING TABLE LOT F
PARKING TABLE LOT F
PARKING SPACE REQUIREMENTS PER SECTION 10.2.4USE: 
6 S
P
A
C
E
S
 (2 V
A
C
. / 1 H
A
 V
A
N
)
(TYP. OF 6)
MOUNT VACUUM
DUAL HEAD POST

Page 30

S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
WG
S
S
GG
S
?
2622
CL&P
2623
CL&P
234
CL&P
3572
CL&P
4362
SNET
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
E
E
C
C
T
FLAG POLE
D
CONC. WALK
                            SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE:   1" =    20'
PROJECT NUMBER:
00222 - 001  
 20 0  20  40  60 
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION                       
SHEET
DATE
REVISED
 5/18/26
 6/26/26
OF   3 6   
REVISION SUMMARY
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
             DORSET CROSSING PAD            
           MASTER DEVELOPMENT PLAN          
                     PREPARED FOR                     
        DIAMOND SPARKLE CAR WASH LLC, APPLICANT       
           GRADING & DRAINAGE PLAN          
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)        
+201.50 
       
        
        
+       
201.50 
        
        
+201.25 
       
        
        
+       
201.25 
        
        
+200.60 
       
        
        
+201.10 
       
        
        
+201.20 
       
        
        
+       
       
        
 201.50 
+       
201.80 
        
        
+200.50 
       
        
        
+       
       
 201.05 
        
+201.20 
       
        
        
+200.10 
       
        
        +               199.20         
+200.70 
       
        
        
+       
200.75 
        
        
+       
201.20 
        
        
+       
       
        
 201.25 
+200.55 
       
        
        
+200.10 
       
        
        
+       
201.05 
        
        
+       
       
        
 200.50 
+       
       
        
 200.50 
+       
       
 199.20 
        
+       
       
        
 200.80 
+       
       
        
 200.80 
+       
200.80 
        
        
+200.85 
       
        
        
+       
       
 201.60 
        
+       
202.00 
        
        
+       
202.00 
        
        
198
200
200
198
200
200
200
202
201
201
201
202
201
LP
L
P
L
P
LP
LP
L
P
L
P
LP
LP
LP
LP
LP
H
O
P
M
E
A
D
O
W
 S
T
R
E
E
T
 (C
T
 R
O
U
T
E
 10 &
 202)
DORSET          CROSSING          DRIVE
Mixed Use Retail/Medical Office
Total 15,000 Square Feet
1 Story
BUILDING #2
CONNECTION (TYP.)
ACCESS/ROADWAY
POSSIBLE FUTURE
DRAINAGE EASEMENT
EASEMENT
FAVOR OF CL&P
EASEMENT IN
OF AQUARION
EASEMENT IN FAVOR
TOWN OF SIMSBURY
EASEMENT IN FAVOR OF
FL = 193.65 (8")
TF = 202.94
EX. SMH
FL = 187.40 (8")
TF = 198.49
EX. SMH
250' - 8" P
V
C
 @
 0.025
FF = 201.50
CAR WASH
1 STORY
BUILDING #1
UTILITY STATEMENT
4455, IN ACCORDANCE WITH CBYD NOTIFICATION PROCEDURES PRIOR TO COMMENCING WORK. 
AUTHORITIES PRIOR TO CONSTRUCTION.  CONTRACTOR TO NOTIFY "CALL BEFORE YOU DIG" AT 1-800-922-
EXISTENCE OF ALL SUCH FEATURES MUST BE FIELD DETERMINED AND VERIFIED BY THE APPROPRIATE
IN NATURE. ADDITIONALLY, OTHER SUCH FEATURES MAY EXIST ON THE SITE. THE SIZE, LOCATION AND
IN THE AREA, EITHER IN-SERVICE OR ABANDONED.  THESE LOCATIONS MUST BE CONSIDERED APPROXIMATE
THIS PLAN SET MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES COMPRISE ALL SUCH UTILITIES
GOVERNMENT AGENCIES, PAROLE TESTIMONY, FIELD SURVEY AND OTHER SOURCES. THE SURVEYOR AND
COMPILED, IN PART, FROM RECORD MAPPING SUPPLIED BY THE RESPECTED UTILITY COMPANIES OR
UNDERGROUND UTILITY, STRUCTURE AND FACILITY LOCATIONS DEPICTED AND NOTED HEREON HAVE BEEN
STUBS PER MAP REF. 2 (VIF)
EXISTING 6" FIRE & 4" DOMESTIC
EXISTING GAS VALVE (VIF)
T
FL(NE) = 196.25 (NEW)
FL(W) = 196.25 (EX.)
TF = 199.10 (NEW)
TF = 198.37 (EX.)
EX. CB-C #F-100
FL(E) = 187.65 (EX.)
TF = 200.70 (NEW)
TF = 201.37 (EX.)
EX. SMH #F-200
FL(W) = 196.32 (EX.)
TF = 200.50 (NEW)
TF = 200.91 (EX.)
EX. CB-C #F-204
FL(S) = 190.88 (EX.)
TF = 201.05 (NEW)
TF = 201.97 (EX.)
EX. SMH #F-201
FL(N) = 190.74 (EX.)
FL(SW) = 191.19 (EX.)
FL(SE) = 190.70 (EX.)
FL(NE) = 196.03 (EX.)
TF = 201.20 (NEW)
TF = 201.88 (EX.)
EX. SMH #F-203
FL(NE) = 191.61 (EX.)
FL(W) = 191.60 (EX.)
TF = 200.10 (NEW)
TF = 200.70 (EX.)
EX. CB-C #F-205
FL(E) = 192.12 (EX.)
FL(S) = 192.09 (EX.)
TF = 199.10 (NEW)
TF = 200.67 (EX.)
EX. CB-C #F-206
@ 0.6%
26 LF - 12" HDPE
FL = 196.40
TF = 199.65
PR. DMH #F-101
@ 0.7%
22 LF - 8" HDPE
FL(E) = 193.80 (24")
FL(W) = 196.55 (12")
TF = 200.05
PR. DMH #F-103
@ 0.9%
110 LF - 12" HDPE
FL(W) = 193.80 (24")
FL(N) = 196.55 (8")
TF = 199.75
PR. DMH #F-104
FL = 197.90 (8")
TF = 200.90
PR. YD #F-106
@ 1.0%
65 LF - 8" HDPE
FL = 197.25 (8")
TF = 200.25
PR. YD #F-105
@ 2.5%
28 LF - 8" HDPE
@ 0.5%
40 LF - 8" HDPE
FL(SE) = 197.80 (NEW)
FL(W) = 197.60 (EX.)
FL(NE) = 197.79 (EX.)
TF = 202.01 (EX.)
EX. CB-C #F-300
FL(N) = 190.73 (EX.)
FL(S) = 190.76 (EX.)
TF = 201.10 (NEW)
TF = 202.01 (EX.)
CONTECH STC 900
EX. STS #F-202
GRADING NOTES
FLOW LINE ELEVATIONS GIVEN AT END OF PIPE SECTIONS.10.
ON THE PLANS.
SEE APPROPRIATE DETAILS TO DETERMINE SUBGRADE ELEVATIONS BELOW FINISH GRADE INDICATED9.
ALL PROPOSED SPOT ELEVATIONS ARE THE FINAL PAVEMENT AND FINAL GRADE ELEVATIONS.8.
AND CORRECT IF ANY, "BIRD BATH" CONDITIONS.
PROVIDE POSITIVE DRAINAGE WITHOUT PONDING. AFTER INSTALLATION, CONTRACTOR TO TEST FOR,7.
PARKING AREAS WILL BE DETERMINED AT THE TIME OF CONSTRUCTION.
NECESSITY FOR SUBDRAINS AND/OR REMOVAL OF ANY UNSUITABLE MATERIAL WITHIN THE PROPOSED
WEIGHT ROLLER TO DETERMINE LOCATIONS OF ANY POCKETS OF UNSUITABLE MATERIAL. THE
AFTER REMOVING PAVEMENT AND/OR STRIPPING TOPSOIL MATERIAL, PROOFROLL WITH A MEDIUM6.
GRANULAR MATERIAL IF WITHIN 5 FEET OF PAVEMENT OR CONCRETE.
TRENCHES FOR ALL STORM DRAIN LINES SHALL BE BACKFILLED COMPLETELY WITH ENGINEERED5.
CONSTRUCTION.
NOTIFY THE UTILITY COMPANY SO A REPRESENTATIVE IS PRESENT TO INSTRUCT AND OBSERVE DURING
COMPANIES.  WHEN EXCAVATING IS AROUND OR OVER EXISTING UTILITIES, THE CONTRACTOR MUST
ON SITE.  ALL VERIFICATIONS (LOCATION, SIZE AND DEPTH) SHALL BE MADE BY THE APPROPRIATE UTILITY
START, OR AS REQUIRED BY GOVERNING UTILITY COMPANY, TO VERIFY IF ANY UTILITIES ARE PRESENT
THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES 72 HOURS BEFORE CONSTRUCTION IS TO4.
AND/OR COMPANIES SO AS NOT TO CAUSE DAMAGE.
EXISTING UTILITY LINES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTORS
THE EXCAVATING CONTRACTOR SHALL TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND3.
REPRESENTATIVE IMMEDIATELY.
DISCREPANCIES BETWEEN THE PLANS AND ACTUAL FIELD CONDITIONS TO THE OWNER OR OWNER'S
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS AND SHALL REPORT ANY
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO THE START OF CONSTRUCTION.2.
BE PERFORMED IN ACCORDANCE WITH THE TOWN OF SIMSBURY STANDARD SPECIFICATIONS.
CONSTRUCTION FORM 819 AS APPLICABLE. WORK WITHIN THE DORSET CROSSING RIGHT-OF-WAY SHALL
TRANSPORTATION STANDARD SPECIFICATIONS FOR ROADS, BRIDGES, FACILITIES AND INCIDENTAL
ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE STATE OF CONNECTICUT DEPARTMENT OF1.
DRAINAGE
STORMWATER O & M
BOTTOM STONE = 192.90±
BOTTOM CHAMBERS = 193.65±
16 CHAMBERS (2 ROWS X 8 UNITS)
SUBSURFACE INFILTRATION SYSTEM
PROPOSED STORMTECH MC-3500
TOP CHAMBERS = 192.29±
BOTTOM CHAMBERS = 187.02±
48 MODULES (4 ROWS X 12 UNITS)
SYSTEM WITH DURA-SKRIM LINER
EXISTING 'RETAIN IT' DETENTION
RL FL = 199.80
RL FL = 199.80
LEADER @ 1.0% (TYP.)
190 LF PVC ROOF
FL(E) = 197.06
FL(W) = 197.01
TF = 201.86
EX. CB-C
FL(SE & NW) = 197.54
FL(N) = 199.23
TF = 202.17
EX. CB-C
FL = 196.13
TF = 199.22
EX. CB-C
FL(W) = 195.74
FL(N) = 195.76
TF = 198.99
EX. CB-C
FL(N) = 192.29
TF = 196.09
EX. CB-C
FL(N) = 192.11
FL(S) = 192.22
TF = 196.01
EX. CB-C
FL = 198.28
TF = 201.04
EX. CB-C
EASEMENT
FL = 197.35
TF = 200.50
48" SUMP W/ HOOD
PR. CB-CL #F-102
FL = 198.00
TF = 200.85
48" SUMP W/ HOOD
PR. CB-CL #F-301
E
X
IS
T
IN
G
 D
R
IV
E
W
A
Y
MANUFACTURER'S RECOMMENDATIONS.
STORMTECH MC-3500 UNITS TO BE INSPECTED AND MAINTAINED IN ACCORDANCE WITH THED.
REMOVE SAND, SALT AND OTHER DEBRIS FROM THE WINTER MAINTENANCE SEASON.
ACCESS DRIVES, PARKING AREAS AND SIDEWALKS SHALL BE SWEPT ANNUALLY EACH SPRING TOC.
DIVERTS FLOW SHALL BE REMOVED AND DISPOSED OF IN AN APPROVED MANNER.
FOLIAGE CLEANUP AND A SECOND TIME DURING SPRING CLEANUP.  ALL DEBRIS THAT OBSTRUCTS OR
INSPECT EACH VEGETATED/LANDSCAPED AREA TWICE ANNUALLY, ONCE IN THE FALL AS PART OFB.
IN AN APPROVED MANNER.
FOLLOWING THE WINTER SEASON.  REMOVE ALL COLLECTED SEDIMENT AND DEBRIS AND DISPOSE OF
INSPECT EACH CATCH BASIN AND STORMWATER TREATMENT STRUCTURE ANNUALLY IN THE SPRINGA.
THE FOLLOWING MAINTENANCE SHALL BE PERFORMED AND A MAINTENANCE LOG COMPLETED.2.
OWNER & PARTY RESPONSIBLE FOR OPERATION AND MAINTENANCE: DIAMOND SPARKLE CAR WASH, LLC1.
MANAGEMENT SYSTEMS FUNCTION AS DESIGNED.
THE FOLLOWING OPERATION & MAINTENANCE PLAN SHALL BE IMPLEMENTED TO ENSURE THAT STORMWATER
LEADER @ 1.0% (TYP.)
165 LF PVC ROOF
FL = 194.15
6" INSERTA TEE
ACCORDANCE WITH THE 2024 STORMWATER QUALITY MANUAL.
TREATMENT HAS BEEN DESIGN AND IMPLEMENTED TO THE MAXIMUM EXTENT ACHIEVABLE INF.
BEEN INSTALLED, AND NO OTHER PRETREATMENT BMP'S ARE FEASIBLE.
CONNECTED TO A DOWNSTREAM SYSTEM WHERE OTHER TREATMENT PRACTICES HAVE ALREADY
A CONTRIBUTING DRAINAGE AREA OF 0.16 ACRES (<0.25), IS IN AN OFFLINE CONFIGURATION, IS
CATCH BASIN #F-301 WILL BE INSTALLED WITH A DEEP SUMP (48") AND A HOOD. THE BASIN HASE.
BEEN INSTALLED, AND NO OTHER PRETREATMENT BMP'S ARE FEASIBLE.
CONNECTED TO A DOWNSTREAM SYSTEM WHERE OTHER TREATMENT PRACTICES HAVE ALREADY
A CONTRIBUTING DRAINAGE AREA OF 0.13 ACRES (<0.25), IS IN AN OFFLINE CONFIGURATION, IS
CATCH BASIN #F-102 WILL BE INSTALLED WITH A DEEP SUMP (48") AND A HOOD. THE BASIN HASD.
CALCULATED WQF RATE OF 1.0 CFS.
MAXIMUM WATER QUALITY FLOW (WQF) TREATMENT RATE OF 1.4 CFS, WHICH EXCEEDS THE
CONTECH STC 900 HYDRODYNAMIC SEPARATOR. THE EXISTING TREATMENT STRUCTURE HAS A
EXISTING 200 SERIES COLLECTION STRUCTURES WILL DISCHARGE THROUGH AN EXISTINGC.
INFILTRATE THE CALCULATED WATER QUALITY VOLUME (WQV) EQUIVALENT TO 1.3" OF RAINFALL.
TO A STORMTECH MC-3500 SUBSURFACE INFILTRATION SYSTEM SIZED TO FULLY RETAIN AND
CLEAN RUNOFF FROM THE ROOF AND ADJACENT LANDSCAPED RAIN GARDENS WILL DISCHARGEB.
ALL CATCH BASINS SHALL HAVE 24" (MIN.) SUMPS EXCEPT AS NOTED.A.
STORMWATER RUNOFF FROM ALL NEW IMPERVIOUS SURFACES WILL BE TREATED AS FOLLOWS:3.
DISCHARGING OFF-SITE AS COMPARED TO THE APPROVED PAD DEVELOPMENT.
THERE WILL BE NO NET INCREASE IN PEAK FLOW RATES FOR THE 1-YEAR THROUGH 100-YEAR STORM2.
SITE VIA CONNECTION TO THE EXISTING COLLECTION SYSTEMS ON SITE.
A SERIES OF ROOF LEADERS, YARD DRAINS, CATCH BASINS & DRAINAGE PIPING AND DISCHARGED OFF
STORMWATER RUNOFF FROM THE PROPOSED DEVELOPMENT OF LOT F WILL BE COLLECTED THROUGH2.
FURNISHING MATERIALS.
THE CONTRACTOR SHALL CONFIRM ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO ORDERING AND/OR
OF THE ORIGINAL DORSET CROSSING PAD MASTER DEVELOPMENT PLAN. SEE MAP REFERENCES 1 & 2.
THE DRAINAGE SYSTEM SERVING LOT F HAS BEEN PARTIALLY INSTALLED AS PART OF THE CONSTRUCTION1.

Page 31

S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
WG
S
S
GG
S
?
2622
CL&P
2623
CL&P
234
CL&P
3572
CL&P
4362
SNET
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
E
E
C
C
T
FLAG POLE
D
CONC. WALK
                            SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE:   1" =    20'
PROJECT NUMBER:
00222 - 001  
 20 0  20  40  60 
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION                       
SHEET
DATE
REVISED
 5/18/26
 6/26/26
OF   4 6   
REVISION SUMMARY
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
             DORSET CROSSING PAD            
           MASTER DEVELOPMENT PLAN          
                     PREPARED FOR                     
        DIAMOND SPARKLE CAR WASH LLC, APPLICANT       
                UTILITY PLAN                
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)        
+201.50 
       
        
        
+       
201.50 
        
        
+201.25 
       
        
        
+       
201.25 
        
        
+200.60 
       
        
        
+201.10 
       
        
        
+201.20 
       
        
        
+       
       
        
 201.50 
+       
201.80 
        
        
+200.50 
       
        
        
+       
       
 201.05 
        
+201.20 
       
        
        
+200.10 
       
        
        +               199.20         
+200.70 
       
        
        
+       
200.75 
        
        
+       
201.20 
        
        
+       
       
        
 201.25 
+200.55 
       
        
        
+200.10 
       
        
        
+       
201.05 
        
        
+       
       
        
 200.50 
+       
       
        
 200.50 
+       
       
 199.20 
        
+       
       
        
 200.80 
+       
       
        
 200.80 
+       
200.80 
        
        
+200.85 
       
        
        
+       
       
 201.60 
        
+       
202.00 
        
        
+       
202.00 
        
        
198
200
200
198
200
200
200
202
201
201
201
202
201
LP
L
P
L
P
LP
LP
L
P
L
P
LP
LP
LP
LP
LP
H
O
P
M
E
A
D
O
W
 S
T
R
E
E
T
 (C
T
 R
O
U
T
E
 10 &
 202)
DORSET          CROSSING          DRIVE
Mixed Use Retail/Medical Office
Total 15,000 Square Feet
1 Story
BUILDING #2
CONNECTION (TYP.)
ACCESS/ROADWAY
POSSIBLE FUTURE
DRAINAGE EASEMENT
EASEMENT
EASEMENT
FAVOR OF CL&P
EASEMENT IN
OF AQUARION
EASEMENT IN FAVOR
TOWN OF SIMSBURY
EASEMENT IN FAVOR OF
FL = 193.65 (8")
TF = 202.94
EX. SMH
FL = 187.40 (8")
TF = 198.49
EX. SMH
FF = 201.50
CAR WASH
1 STORY
BUILDING #1
ROOM
UTILITY
METER
ELECTRIC
METER
GAS
EXISTING TRANSFORMER
E
X
IS
T
IN
G
 D
R
IV
E
W
A
Y
UTILITY STATEMENT
4455, IN ACCORDANCE WITH CBYD NOTIFICATION PROCEDURES PRIOR TO COMMENCING WORK. 
AUTHORITIES PRIOR TO CONSTRUCTION.  CONTRACTOR TO NOTIFY "CALL BEFORE YOU DIG" AT 1-800-922-
EXISTENCE OF ALL SUCH FEATURES MUST BE FIELD DETERMINED AND VERIFIED BY THE APPROPRIATE
IN NATURE. ADDITIONALLY, OTHER SUCH FEATURES MAY EXIST ON THE SITE. THE SIZE, LOCATION AND
IN THE AREA, EITHER IN-SERVICE OR ABANDONED.  THESE LOCATIONS MUST BE CONSIDERED APPROXIMATE
THIS PLAN SET MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES COMPRISE ALL SUCH UTILITIES
GOVERNMENT AGENCIES, PAROLE TESTIMONY, FIELD SURVEY AND OTHER SOURCES. THE SURVEYOR AND
COMPILED, IN PART, FROM RECORD MAPPING SUPPLIED BY THE RESPECTED UTILITY COMPANIES OR
UNDERGROUND UTILITY, STRUCTURE AND FACILITY LOCATIONS DEPICTED AND NOTED HEREON HAVE BEEN
UTILITY NOTES
WATER NOTES
SANITARY NOTES
ELECTRIC & TELECOMMUNICATIONS
GAS
FOR CLARITY PIPES MAY NOT BE DRAWN TO SCALE OR EXACTLY LOCATED.5.
THE INFORMATION ON THE DRAWINGS.
FIELD VERIFIED. NOTIFICATION SHALL BE GIVEN TO THE OWNER IF THE FIELD VERIFICATION DIFFERS FROM
IS IN THE VICINITY OF EXISTING PIPING, THE LOCATION AND ELEVATION OF THE EXISTING PIPING SHALL BE
WHEN CONNECTIONS ARE TO BE MADE TO EXISTING PIPING AND STRUCTURES OR WHERE CONSTRUCTION4.
BE CONTACTED BY THE CONTRACTOR.
BEFORE WORKING WITH OR AROUND EXISTING UTILITIES, THE APPROPRIATE UTILITY COMPANY SHALL3.
THE CONTRACTOR, AT HIS EXPENSE WITH THE PERMISSION OF THE OWNER.
CONSTRUCTION WITHOUT UNDUE INTERRUPTION OF SERVICE MAY BE REMOVED AND REPLACED BY
UNLESS OTHERWISE INDICATED ON THE DRAWINGS.  ANY PIPING WHICH CAN BE REMOVED DURING
LOCATE AND MAINTAIN IN SERVICE ALL EXISTING UTILITIES ENCOUNTERED DURING CONSTRUCTION
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE AND ORDER ALL NEW SERVICES,2.
SPECIFICATIONS AND DETAILS OF THE APPROPRIATE PUBLIC UTILITY COMPANY.
ALL UNDERGROUND UTILITIES MUST BE INSTALLED IN ACCORDANCE WITH THE STANDARDS,1.
FINAL CONNECTION LOCATION SUBJECT TO REVIEW AND APPROVAL BY EVERSOURCE.
NEW BUILDING BY A CONNECTION TO THE EXISTING TRANSFORMER ON THE WESTERLY PROPERTY LINE.
NEW ELECTRIC & TELECOMMUNICATIONS SERVICES SHALL BE PROVIDED TO THE UTILITY ROOM IN THE1.
CONNECTICUT NATURAL GAS.
NORTHWEST CORNER OF THE SITE. CONNECTION LOCATION AND SIZE TO BE REVIEWED AND APPROVED
THE NEW BUILDING SHALL BE SERVED BY A NEW GAS CONNECTION TO AN EXISTING STUB AT THE2.
THE CONTRACTOR PRIOR TO INSTALLING GAS SERVICES.
THE LOCATION, SIZE, AND DEPTH OF ALL CONNECTION POINTS SHALL BE VERIFIED IN THE FIELD BY1.
STUBS PER MAP REF. 2 (VIF)
EXISTING 6" FIRE & 4" DOMESTIC
EXISTING GAS VALVE (VIF)
8" CLDIP WATER MAIN
12" CLDIP WATER MAIN
TOWN OF SIMSBURY.
COMPANY OF CONNECTICUT RULES AND REGULATIONS DATED JULY 31, 2024, AS AMENDED AND THE
ALL MATERIALS AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE AQUARION WATER5.
(SDR 26) PIPE WITH GASKETED, COMPRESSION-TYPE JOINTS WITHIN 10 FEET OF THE  WATER LINE.
CONSTRUCTED OF WATER WORKS GRADE DUCTILE IRON PIPE WITH MECHANICAL JOINTS OR PVC
SANITARY SEWER LINES. IF 18 INCHES OF CLEARANCE IS NOT PROVIDED THEN THE SEWER MUST BE
A MINIMUM OF 18 INCHES OF VERTICAL CLEARANCE SHALL BE PROVIDED BETWEEN NEW WATER AND4.
ALL NEW WATER LINES SHALL HAVE A MINIMUM OF 54" OF COVER.3.
CONFORM TO CLASS 52 CONFORMING TO AWWA C151.
AT THE NORTHWEST CORNER OF THE SITE TO THE UTILITY ROOM IN THE NEW BUILDING. PIPE SHALL
A NEW 4"Ø CLDIP DOMESTIC WATER SERVICE SHALL BE INSTALLED FROM THE EXISTING SERVICES STUB3.
CONFORMING TO AWWA C151.
THE SITE TO THE SPRINKLER ROOM IN THE NEW BUILDING. PIPE SHALL CONFORM TO CLASS 52
SERVICE SHALL BE INSTALLED FROM THE EXISTING SERVICE STUB AT THE NORTHWEST CORNER OF
FIRE/SPRINKLER SERVICES FOR THE CAR WASH ARE NOT REQUIRED. IF REQUIRED THE NEW FIRE2.
THE CONTRACTOR PRIOR TO ORDERING, FURNISHING, OR INSTALLING WATER SERVICES.
THE LOCATION, SIZE, AND DEPTH OF ALL CONNECTION POINTS SHALL BE VERIFIED IN THE FIELD BY1.
FL (CALC) = 190.7± (VIF)
LATERAL PER MAP REF. 2.
EXISTING 6" PVC SANITARY SERVICE
SIZE TO BE CONFIRMED BY MEP
4" DOMESTIC WATER SERVICE
T
FL (CALC) = 191.2± (VIF)
STUB PER MAP REF. 2.
EXISTING 6" PVC SANITARY
6" FL = 196.5±
6" FL = 198.0±
6" FL = 198.0±
6" FL = 198.0±
6" FL = 198.0±
ELECTRIC & TELECOMM SERVICE
GAS SERVICE
@ 0.070 FT/FT
45 LF - 8"Ø PVC (SDR35)
@ 0.083 FT/FT
26 LF - 8"Ø PVC (SDR35)
FL(OUT) = 194.25
FL(IN) = 194.35
TF = 201.25
SMH #1
FL(OUT) = 197.00
FL(IN) = 197.10
TF = 201.45
SMH #2
FL(OUT) = 197.65
FL(IN) = 197.85
TF = 201.45
SMH #3
DESIGN BY OTHERS
WATER RECOVERY SYSTEM
ADAWF, MAX. DAILY, AND PEAK DEMAND TO BE CONFIRMED BY MEP.C.
CALCULATED ADAWF = 31,940 GPDB.
WASH FACILITY IN COLCHESTER, CT WITH GROWTH FACTOR = 1.36 AND FACTOR OF SAFETY = 1.50.
AVERAGE DAILY FLOW CALCULATED BASED ON METER FLOW READINGS FROM DIAMOND SPARKLE CARA.
SANITARY SEWER FLOW CALCULATIONS:5.
POLLUTION CONTROL AUTHORITY RULES AND REGULATIONS.
ALL MATERIALS AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE TOWN OF SIMSBURY WATER4.
THE DOWNSTREAM DIRECTION OF THE MAIN SHALL BE MADE.
SEWER MAIN IS REQUIRED, A SADDLE OR OTHER APPROVED CONNECTION METHOD AT AN ANGLE OF 45° IN
DIRECT CONNECTION TO THE EXISTING SEWER STUB SHALL BE MADE. IF DIRECT CONNECTION TO THE3.
PIPE SLOPE SHALL BE 2% AND THE MAXIMUM PIPE SLOPE SHALL BE 10%
CONFORM TO ASTM D2241 AND SHALL MEET THE DEFLECTION STANDARDS OF ASTM D3303. THE MINIMUM
AN EXISTING 6" STUB IN THE 8" PVC SEWER MAIN IN THE DRIVEWAY TO THE WEST. THE PIPE SHALL
THE NEW BUILDING WILL BE SERVED BY A 6"Ø PVC (SDR 35) SANITARY SEWER LATERAL CONNECTING TO2.
THE CONTRACTOR PRIOR TO ORDERING, FURNISHING, OR INSTALLING SEWER SERVICES.
THE LOCATION, SIZE, TYPE, AND DEPTH OF ALL CONNECTION POINTS SHALL BE VERIFIED IN THE FIELD BY1.
FL = 185.09 (8")
TF = 197.39
EX. SMH
FL = 184.11 (8")
TF = 196.63
EX. SMH
TF = 193.81
EX. SMH
REMOVED OR ABANDONED
WATER PIPE STUBS TO BE
EXISTING FIRE AND DOMESTIC
250' - 8" P
V
C
 @
 0.025

Page 32

 
 
NOTES:
1. INSTALL PER MANUFACTURER
SPECIFICATIONS.
2. INSPECT PER EROSION CONTROL
NOTES OR AS DIRECTED.
3. REMOVE SEDIMENT WHEN BAG
IS HALF FULL AND DEPOSIT PER
EROSION CONTROL NOTES.
4. REPAIR OR REPLACE WITHIN 24
HOURS OF OBSERVED FAILURE.
S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
E
E
C
T
FLAG POLE
CONC. WALK
ANTI-TRACKING PAD DETAIL
SOIL STOCKPILE DETAIL
SECTIONELEVATION
SILT FENCE
INLET SEDIMENT
CONTROL DEVICE
TEMPORARY SEDIMENT TRAP (TST) SIZING
PLAN
TEMPORARY SEDIMENT TRAP
OUTLET SECTION
                            SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE:   1" =    20'
PROJECT NUMBER:
00222 - 001  
 20 0  20  40  60 
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION                       
SHEET
DATE
REVISED
 5/18/26
 6/26/26
OF   5 6   
REVISION SUMMARY
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
             DORSET CROSSING PAD            
           MASTER DEVELOPMENT PLAN          
                     PREPARED FOR                     
        DIAMOND SPARKLE CAR WASH LLC, APPLICANT       
    EROSION & SEDIMENTATION CONTROL PLAN    
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)        
38C
NRCS
38C
NRCS
38C
NRCS 34A
NRCS
34A
NRCS
34B
NRCS
198
200
200
198
200
200
200
202
201
201
201
202
201
DORSET          CROSSING          DRIVE
SEE PLAN FOR WIDTH
NOT TO SCALE
COMPACTED SUBGRADE
50'-0" MIN. LENGTH
ROAD
6" CTDOT 2" STONE
FOR LOW SOIL BEARING CAPACITY
USE MIRAFLEX 600X OR EQUAL
2 MAX
3
NOT  TO  SCALE
MATERIAL STOCKPILE
FLOW
(TYP.)
STOCKPILE (TYP.)
OF MATERIAL 
AROUND PERIMETER
SYSTEM PLACED
EROSION CONTROL 
NOT TO SCALE
FLOW
3'-0" M IN.
NOTES:
1.  INSTALL SILT FENCE & WOOD STAKES AS RECOMMENDED BY MANUFACTURER.
2. SILT FENCE SUBJECT TO HEAVY LOADS SHALL BE REINFORCED WITH FARM FENCING & STEEL 
POSTS (0.5 # STEEL/L.F.).  THE MINIMUM POST LENGTH SHALL BE 5'-0".
3. SILT FENCE FABRIC SHALL BE A PERVIOUS SHEET OF WOVEN PROPYLENE, NYLON, POLYESTER
OR POLYETHYLENE FILAMENTS AND SHALL BE CERTIFIED BY THE MANUFACTURER OR SUPPLIER.
2'-6" M
IN
.
12" M
IN
.
100°
10'-0" MAX.
 
6" M IN.
GRADE
FINISH
GRADE
FINISH
FENCE (SEE NOTE 2)
ATTACHED TO WIRE
SILT FENCE FABRIC
SELF-SUPPORTING
BACKFILL
RECOMPACTED 
GROUND
FABRIC BELOW
EXTEND 6" OF
(MIN. LENGTH: 3' - 6')
1" x 2" WOOD STAKE
NOT TO SCALE
DUMPING STRAPS
STORM GRATE CURB OPENING
SILT SACK
LIFT STRAPS
CURB FILTER
PORTS
OUTFLOW
OPTIONAL
CT DOT #3 STONE
GEOTEXTILE FABRIC
MODIFIED RIPRAP
HAYBALES
DIVERTED RUNOFF
OUTLET
NOT TO SCALE
W
L
VARIES2'
1' M IN.
5' M AX.
1.5
1
1
2
1
2
2
1
WEIR
SOIL BERM
TST AREA (AC) REQUIRED WET VOL. DRY VOL.
(ACRE) VOL. (CY) (CY) (CY)
1 1 134 67 67
18" DRY VOLUM E
18" W ET VOLUM E
Mixed Use Retail/Medical Office
Total 15,000 Square Feet
1 Story
BUILDING #2
FF = 201.50
CAR WASH
1 STORY
BUILDING #1
8" CLDIP WATER MAIN
T
250' - 8" P
V
C
 @
 0.025
GENERAL CONSTRUCTION NOTES
SEQUENCE OF CONSTRUCTION
E & S CONTROL NARRATIVE
EROSION & SEDIMENT CONTROL PLAN
E & S CONTROL NOTES
INSPECTION AND MAINTENANCE
SIMSBURY AND THE STATE OF CONNECTICUT.
THE CONTRACTOR SHALL CONFORM TO ALL REQUIREMENTS OF ALL LOCAL AGENCIES OF THE TOWN OF2.
TO BE PERFORMED.
THE CONTRACTOR IS REQUIRED TO OBTAIN ALL NECESSARY LOCAL AND STATE PERMITS FOR THE WORK1.
REMOVE E&S CONTROLS WHEN PERMANENT VEGETATIVE COVER IS ESTABLISHED.11. 
FINISH GRADE, SPREAD TOPSOIL, SEED, AND COMPLETE PLANTING.10.
INSTALL BITUMINOUS CONCRETE & CURBING.9. 
CONSTRUCT ACCESS DRIVES, PARKING AREAS & WALKS.8.
INSTALL UTILITIES AND STORM DRAINAGE.7.
INSTALL FOUNDATION & ERECT BUILDING.6.
EXCAVATE, PLACE FILL AND ROUGH GRADE SITE.5.
STRIP & STOCKPILE TOPSOIL. EXPORT EXCESS TOPSOIL AS REQUIRED.4.
ABANDON AND/OR REMOVE UTILITIES AS REQUIRED.3.
FOR FIELD CONDITIONS.
INSTALL EROSION CONTROL MEASURES AT THE LOCATIONS SHOWN ON THE PLANS OR AS REQUIRED2.
COORDINATE A MEETING WITH TOWN AND OWNER. RESPONSIBLE PARTIES TO BE IDENTIFIED.1.
CONSTRUCTION UNTIL DISTURBED AREAS ARE STABILIZED.
FEATURES, MINIMIZE SOIL DISTURBANCE, AND MAINTAIN E&S CONTROLS FOR THE DURATION OF
WITHIN THE DEVELOPMENT AREA. THE CONTRACTOR SHALL TAKE CARE TO PRESERVE SURROUNDING
THE TOPOGRAPHY CONSISTS OF GENTLY SLOPING TERRAIN, WITH SLOPES RANGING FROM 2% TO 5%2.
MEASURES SHALL BE EMPLOYED AS REQUIRED, SUCH AS COVERING STOCKPILES OR APPLYING WATER.
TO WIND-BLOWN EROSION. LONG-TERM EXPOSURE OF THESE SOILS SHALL BE AVOIDED.  DUST-CONTROL
MODERATE SUSCEPTIBILITY TO SHEET AND RILL EROSION AND A MODERATE TO HIGH SUSCEPTIBILITY
MERRIMAC FINE SANDY LOAM TO THE EAST. USDA IDENTIFIES THE SOILS AS HAVING A LOW TO
PER USDA NRCS SOIL MAPPING, THE SITE CONSISTS OF HINCKLEY LOAMY SAND TO THE WEST AND1.
CONCERNS & ISSUES SHALL BE NOTED:
DEPICTED ON THIS SHEET SHALL BE FOLLOWED.  IN ADDITION THE FOLLOWING SITE SPECIFIC E&S CONTROL
THE EROSION & SEDIMENTATION CONTROL NOTES, INSPECTION REQUIREMENTS, PLANS, AND DETAILS
ARE COMPLETED. 
STABILIZATION OF THE SITE WILL OCCUR IN SEQUENCE AS THE BUILDING AND SURROUNDING IMPROVEMENTS
SEDIMENTATION. PHASING OF MASS EARTH WORK IS NOT REASONABLE DUE TO THE LIMITED SIZE OF THE SITE.
MINIMIZES THE AREA, LIMIT AND TIME SOILS ARE EXPOSED TO RAIN AND WIND AND SUBJECT TO EROSION &
PART OF THE WORK, INCLUDING CONNECTION TO THE EXISTING PAVED DRIVEWAY TO THE WEST. THE PLAN
THE EXISTING PARCEL IS APPROXIMATELY 1.08 ACRE.  APPROXIMATELY 1.1 ACRES WILL BE DISTURBED AS
IMPROVEMENTS. THE GENERAL SCOPE OF WORK IS DESCRIBED ABOVE IN THE CONSTRUCTION SEQUENCE. 
THE PROPOSED PROJECT CONSISTS OF THE CONSTRUCTION OF A CAR WASH FACILITY AND ASSOCIATED SITE
AND SWALES SHALL BE MAINTAINED TO CONTROL RUNOFF AND PREVENT SEDIMENT DISCHARGE.
PUBLIC ROW AND INFILTRATION SHALL BE MAINTAINED. AT ALL TIMES DURING CONSTRUCTION, THE TST'S
DIRECTED TO THE TST'S. CONSTRUCTION WASTEWATERS SHALL NOT DISCHARGE DIRECTLY TO THE
DURING SITE CONSTRUCTION. ALL DEWATERING DISCHARGE AND CONSTRUCTION RUNOFF SHALL BE
TEMPORARY SILTATION TRAPS (TST) AND DIVERSION SWALES SHALL BE INSTALLED AS NECESSARY7.
DUST CONTROL MEASURES SHALL BE APPLIED THROUGHOUT THE CONSTRUCTION PERIOD. 6.
AN EROSION CONTROL SYSTEM SHALL BE INSTALLED AROUND ALL STOCKPILES OF SOIL.5.
BASINS ON SITE SHALL BE SURROUNDED WITH STRAW WADDLES OR BALES.  
SACKS AS SHOWN ON THE PLAN THROUGHOUT THE CONSTRUCTION PERIOD. IF REQUIRED, NEW CATCH
ALL CATCH BASINS WITHIN THE PROJECT AREA SHALL BE PROTECTED WITH INLET CONTROL FILTER SILT4.
TRAFFIC. THE SURROUNDING ROAD SURFACES SHALL BE SWEPT DAILY OR AS REQUIRED.
TO PREVENT THE TRANSPORT OF SEDIMENTS OFF THE CONSTRUCTION SITE BY TRUCKS AND EQUIPMENT
AN ANTI-TRACKING APRON WILL BE INSTALLED AT ALL ENTRANCES TO THE CONSTRUCTION SITE IN ORDER3.
CONSTRUCTION WHEREVER POSSIBLE.
ALL EROSION AND CONTROL MEASURES SHALL BE INSTALLED AT THE PROJECT SITE PRIOR TO2.
EMERGENCY CONTACT: TO BE PROVIDED PRIOR TO ISSUANCE OF BUILDING PERMIT
PARTY RESPONSIBLE FOR E&S CONTROL PLAN: DIAMOND SPARKLE CAR WASH, LLC1.
100 LBS. PER ACRE.
TEMPORARY GRASS SEEDING, IF NECESSARY, SHALL BE PERENNIAL RYE GRASS APPLIED AT A RATE OF11.
ACRE OR AS RECOMMENDED BY THE SEED MANUFACTURER.
GRASS SEED MIXTURES SHALL BE TALL FESCUE BLEND APPLIED AT A RATE NO LESS THAN 100LBS PER10.
SPRING: APRIL 15 TO JUNE 15, FALL: AUGUST 15 TO SEPTEMBER 15
THE FOLLOWING DATES FOR SEEDING SHALL BE USED:9.
AREAS OUTSIDE OF IMPERVIOUS AREAS TO RECEIVE A MINIMUM 4" OF TOPSOIL.8.
IN CTDOT FORM 819 OR AS DIRECTED BY THE LANDSCAPE ARCHITECT.
ALL DISTURBED AREAS ARE TO BE RAKED, SEEDED AND FERTILIZED PER "TURF ESTABLISHMENT" SPEC.7.
THESE PLANS OR AS DIRECTED BY THE ENGINEER OR TOWN.
THE CONTRACTOR WILL BE RESPONSIBLE FOR IMPLEMENTING ALL E&S CONTROL DEVICES AS SHOWN ON6.
IS CONSISTENT WITH THE INTENT OF THE PLAN.
SEDIMENT REMOVED FROM ANY CONTROL STRUCTURES SHALL BE DISPOSED OF IN A MANNER WHICH5.
DURING THE CONSTRUCTION PERIOD AS NECESSARY OR REQUIRED BY THE ENGINEER OR THE TOWN.
EROSION CONTROL DEVICES SHALL BE MAINTAINED, REPLACED AND/OR ADDED BY THE CONTRACTOR4.
DATED 2023, AS AMENDED AND THE TOWN OF SIMSBURY REGULATIONS.
SPECIFICATIONS OF THE "CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL",
ALL E&S CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE STANDARDS AND3.
E&S CONTROL MEASURES SHALL BE INSTALLED PER THE PLANS, OR AS DIRECTED BY THE TOWN.2.
CONSTRUCTION IS ANTICIPATED TO START IN FALL 2026 AND BE COMPLETED IN 2027.1.
ALL STORMWATER STRUCTURES SHALL BE CLEANED AFTER REMOVAL OF E&S CONTROLS.6.
 THE HEIGHT (MAX.)2 1STRAW BALES - REMOVE COLLECTED SEDIMENT @ iv.
SILT SACKS - CLEAN PER MANUFACTURER'S RECOMMENDATIONSiii.
 THE HEIGHT (MAX.)2 1SILT FENCE - REMOVE COLLECTED SEDIMENT @ ii.
ANTI-TRACKING APRON - REPLENISH OR REPLACE STONE SA REQUIREDi.
TEMPORARY CONTROLS SHALL BE INSPECTED WEEKLY AND CLEANED:B.
INSPECT ROAD DAILY AND SWEEP/REMOVE TRACKED MATERIALS AS REQUIREDA.
ROUTINE INSPECTION AND MAINTENANCE SCHEDULE:5.
 CAPACITY2 1DEWATERING BASINS - REMOVE COLLECTED SEDIMENT @ C.
 DEPTH4 1SWALES - REMOVE COLLECTED SEDIMENT @ B.
 DEPTH OF SUMP2 1CATCH BASINS - REMOVE COLLECTED SEDIMENT @ A.
GREATER THAN 0.1 INCHES AND CLEANED AS FOLLOWS:
ALL STORMWATER STRUCTURES SHALL BE INSPECTED WITHIN 24 HOURS AFTER RAINFALL EVENTS4.
AFTER RAINFALL EVENTS GREATER THAN 0.1 INCHES
ALL E&S CONTROLS SHALL BE INSPECTED, REPAIRED, AND CLEANED IF NECESSARY WITHIN 24 HOURS3.
CLEANED TO ENSURE THEY ARE IN PROPER WORKING ORDER.
CONDITIONS OR EFFECTS, ALL E&S CONTROLS SHALL BE INSPECTED, MAINTAINED, REPAIRED AND/OR
PRIOR TO A MAJOR STORM IN WHICH THE NOAA ISSUES WARNINGS OF FLOODING, SEVERE WEATHER2.
THE RESPONSIBLE PARTY SHALL PERFORM ROUTINE INSPECTIONS BASED ON THE FOLLOWING.1.
THE SITE IS STABILIZED.
RESPONSIBLE PARTY SHALL IMPLEMENT THE FOLLOWING THROUGHOUT THE CONSTRUCTION PERIOD UNTIL
REGULAR INSPECTION AND MAINTENANCE IS CRITICAL FOR THE EFFECTIVENESS OF E&S CONTROLS. THE
SWEPT AS REQUIRED
ROADWAY TO BE
APRON
ANTI-TRACKING
WET VOLUME = 67 CY
DRY VOLUME = 67 CY
TST #1
STOCKPILE
TOPSOIL
AROUND ALL BASINS (TYP.)
DEVICE TO BE INSTALLED
INLET SEDIMENT CONTROL
BOUNDARIES OR AS SHOWN (TYP.)
NORTH, EAST & SOUTH PROPERTY
SILT FENCE TO BE INSTALLED ALONG
DIVERSION SWALE TO WEST
WALL OF EX. CATCH BASIN
DISCHARGE INTO ORIFICE IN NORTH
STONE & RIPRAP WEIR FROM TST TO

Page 33

S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
WG
S
S
GG
S
?
2622
CL&P
2623
CL&P
2623S
CL&P
ELEV.=198.71
E 989669.19
N 891545.09
P.K. NAIL
CP#19068
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
E
E
C
C
T
FLAG POLE
ELEV.=204.26
E 989309.93
N 891321.88
REBAR
CP#173
D
CONC. WALK
SET
MON.'S
SET
MON.
SET
MON.
SET
MON.
SET
MON.
SET
MON.
connection (typ.)
access/roadway 
Possible future 
connection (typ.)
access/roadway 
Possible future  
Mixed Use Retail/Medical Office
Total 15,000 Square Feet 1 Story
BUILDING #2
13A
Signal
Traffic
NOTES:
LIGHT POLE & BASE
                            SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE:   1" =    20'
PROJECT NUMBER:
00222 - 001  
 20 0  20  40  60 
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION                       
SHEET
DATE
REVISED
 5/15/26
 6/26/26
OF   6 6   
REVISION SUMMARY
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
             DORSET CROSSING PAD            
           MASTER DEVELOPMENT PLAN          
                     PREPARED FOR                     
        DIAMOND SPARKLE CAR WASH LLC, APPLICANT       
                LIGHTING PLAN               
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)        
LP
L
P
L
P
LP
LP
L
P
L
P
LP
LP
LP
LP
LP
DORSET          CROSSING          DRIVE
H
O
P
M
E
A
D
O
W
 S
T
R
E
E
T
 (C
T
 R
O
U
T
E
 10 &
 202)
NOT TO SCALE
1.  CLASS "F" CONCRETE CTDOT 816
2. REINFORCEMENT NOT SHOWN FOR
CLARITY. GRADE 60.
3. ANCHOR BOLTS HOT DIPPED GALVANIZED.
DIAMETER, PROJECTION EMBEDMENT, 
    LOCATION PER LIGHT POLE MANUAL.
4. EXTERIOR LAMP, BASE & POST SHALL BE
COORDINATED WITH TOWN, OWNER, &
ELECTRICAL CONTRACTOR
CONDUIT
2" DIA. PVC
GRADE
FINISH
1" CHAMFER
(TYP. OF 2)
2" DIA. PVC SWEEP
GROUND ROD
1" DIA. PVC FOR
(SEE NOTE 3)
ANCHOR BOLT
MANUFACTURER
PER LIGHT POLE
BOLT  PATTERN AS
24" DIA.
24" Ø
6"42"
DISTRIBUTION AS SPECIFIED
LIGHT FIXTURE OR EQUAL
LUMARK 'PRV-C15-D-UNV'
COOPER LIGHTING SOLUTIONS
15' M
O
U
N
T
IN
G
 H
E
IG
H
T
 A
B
O
V
E
 B
A
S
E
LIGHTING STATEMENT
LIGHTING NOTES
LUMINAIRE SCHEDULE
ARRANGEMENTDESCRIPTIONLABELQUANTITYSYMBOL
DOUBLEPRV-C15-730-D-UNV-T4-SA-BKT4A0
SINGLEPRV-C15-730-D-UNV-T4-SA-BK-HSST4HSS12
SINGLEPRV-C15-730-D-UNV-T4-SA-BKT40
T4HSS
T4HSS
T4HSS
T4HSS
T4HSS
T4HSS
T4HSS
0.1 fc
0.1 fc
0.1 fc
0.1 fc
0.1 fc
0.1 fc
0.2 fc
0.2 fc
0.2 fc
0.2 fc
0.2 fc
0.5 fc
0.5 fc
0.5 fc
0.5 fc
0.5 fc
1.0 fc
1.0 fc
1.0 fc
1.0 fc
1.0 fc
2.0 fc
2.0 fc
2.0 fc
2.0 fc
E
X
IS
T
IN
G
 D
R
IV
E
W
A
Y
AREA = 7,275 SF±
CAR WASH
1 STORY
BUILDING #1
CANOPY
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
ISOLINE CONTOUR (TYP.)
ISOLINE VALUE (TYP.)
T4HSS
T4HSS
T4HSS
T4HSS
T4HSS
0.2 fc
T4HSS
INTERNAL SITE LIGHTING AT COMMON LOT LINES IS IN HARMONY WITH THE APPROVED PAD DEVELOPMENT.
A MAXIMUM ILLUMINATION VALUE OF 0.5 FC HAS BEEN MET AT THE DORSET CROSSING ROW (SOUTH).2.
PROPERTY LINES HAVE NOT BEEN CONSIDERED IN THE ANALYSIS.
BUILDING MOUNTED LIGHTING OR EXISTING POLE MOUNTED FIXTURES ALONG THE NORTH, WEST, AND SOUTH
OF 0.5 TO 2.0 FC FOR DRIVES, PARKING AREAS AND PEDESTRIAN WALKS SERVING THE BUILDING ENTRANCES.
SOCIETY. MINIMUM HORIZONTAL ILLUMINATION LEVELS OF 0.2 FC ARE PROPOSED WITH A TYPICAL RANGE
DEVELOPMENT AND GENERALLY MEETS THE RECOMMENDATIONS OF THE ILLUMINATING ENGINEERING
EXTERIOR LIGHTING HAS BEEN DESIGNED FOR A SUBURBAN COMMERCIAL USE WITHIN AN APPROVED PAD1.
PHOTOMETRIC PLAN.
CANOPY LIGHTS WILL BE DARKSKY APPROVED OR MOUNTED IN THE CEILING. NOT INCLUDED IN
SEE ARCHITECTURAL PLANS FOR BUILDING AND CANOPY MOUNTED LIGHTING. ALL BUILDING AND4.
LEVELS SET TO 25% OF DESIGN VALUES.
LIGHTING WITHIN 15 MINUTES OF NO ACTIVITY SHALL HAVE REDUCED POWER OUTPUT AND ILLUMINATION
SECURITY AND SAFE VEHICULAR CIRCULATION THROUGH THE SITE FOR USE OF THE SELF-SERVE BAYS.
TIMERS, PHOTOCELLS, OR MOTION SENSORS TO REDUCE LIGHTING TO THE MINIMUM NECESSARY FOR
ARE CLOSED, ALL NON-ESSENTIAL LIGHTING FIXTURES SHALL BE CONTROLLED MANUALLY OR WITH
THE SELF-SERVE BAYS ARE OPEN 24 HOURS. WHEN THE AUTOMATIC TUNNEL AND TOUCHLESS BAYS3.
POLE-MOUNTED = 15' FIXTURE HEIGHTA.
FIXTURE MOUNTING HEIGHTS:2.
THAN 10° OF TILT.
PREVAIL LED IS DARKSKY APPROVED FOR 3000K CCT AND WARMER, WITH MOUNTING OPTIONS LESS
OF LIGHT AND GLARE ON ADJACENT PROPERTIES AND ROADWAYS. THE SELECTED FIXTURE LUMARK
ALL SITE LIGHTING SHALL BE FULL CUT-OFF OF SHIELDED TYPE TO PREVENT UPWARD DISTRIBUTION1.

Page 34

Page 35

Page 36

Site Plant Schedule; 100% Native By Variety: 100% Native By Amount: 
Key Quantity Botanical Name  Common Name  Size Installed Comments 
Street / Shade / Ornamental Trees: 
Aag # 1  Acer rubrum ‘Armstrong Gold’   Armstrong Gold Maple 2” – 2-1/2" Cal., 10’ O.C. B & B (N) 
Arr # 2  Acer rubrum ‘Redpointe’    Redpointe Maple 2” – 2-1/2" Cal., 30’ O.C. B & B (N) 
Axa # 1  Acer x freemani ‘Armstrong’  Armstrong Freeman Maple  2” – 2-1/2" Cal., 15’ O.C. B & B (N) 
Alu # 2  Amelanchier laevis ‘Lustre’  Lustre Alleg. Serviceberry  2” – 2-1/2" Cal., 15’ O.C. B & B (N) 
Coc # 2  Celtis occidentalis  Hackberry  2” – 2-1/2" Cal., 40’ O.C. B & B (N) 
Cbh # 1  Cercis canadensis ‘Burgundy Hearts’ Burgundy Hearts Eastern Redbud 2” – 2-1/2" Cal., 25’ O.C. B & B (N)
Lss # 2  Liquidamber sty.‘Slender Silhouette’ Slender Silhouette Sweetgum  2” – 2-1/2" Cal., 6’ O.C. B & B (N) 
Lha # 1  Liquidamber styraciflua ‘Hapdell’ Hapdell Sweetgum  2” – 2-1/2" Cal., 30’ O.C. B & B (N) 
Nwf # 1  Nyssa sylvatica ‘Wildfire’  Wildfire Black Tupelo 2” – 2-1/2" Cal., 25’ O.C. B & B (N) 
Qpb # 2  Quercus pal. ‘Pacific Brilliance’ Pacific Brilliance Pin Oak  2” – 2-1/2" Cal., 25’ O.C. B & B (N)  
Qco # 2    Quercus coccinea  Scarlet Oak  2” – 2-1/2" Cal., 45’ O.C. B & B (N) 
Uap # 1  Ulmus americana ‘Princeton’  American Elm  2” – 2-1/2” Cal., 40’ O.C. B & B (N) 
Evergreen Trees:
Ish # 1  Ilex opaca ‘Satyr Hill’  Satyr Hill Holly 6’ – 7’ Ht., 13’ O.C.  B & B (N-E) 
Shrubs / Ornamental Grasses:
Ape # 8  Azalea periclymenoides Pinxterbloom Azalea  3 Gal., 4.5' O.C. Container (N) 
Bba # 19  Bouteloua gra. ‘Blonde Ambition’ Blonde Ambition Gramma  1 Gal., 2.75’ O.C.  Container (N) 
Cla # 9  Chasmanthium latifolium  Northern Sea Oats  1 Gal., 2’ O.C.  Container (N) 
Cse # 2  Cornus sericea ‘Arctic Fire’   Arctic Fire Dogwood  3 Gal, 4' O.C.  Container (N) 
Gba # 13  Gaylussacia baccata  Black Huckleberry  2 Gal., 2.5’’ O.C.  Container (N) 
Igd # 4  Ilex glabra ‘Densa’   Dense Inkberry Holly  3 Gal., 6’ O.C.  Container (N-E) 
Jgc # 5  Juniperus communis ‘Gold Cone’  Gold Cone Juniper  3 Gal., 2.75' O.C Container (N-E) 
Jhg # 5  Juniperus horizon. ‘Golden Carpet‘ Golden Carpet Juniper 2 Gal., 3.5' O.C. Container (N-E) 
Jyt # 4  Juniperus hor. ‘P.C. Youngstown’ Youngstown Juniper  2 Gal., 5' O.C.  Container (N-E) 
Kau # 15  Kalmia augustfolia  Sheep Laurel  2 Gal., 4' O.C.  Container (N-E) 
Knh # 4  Kalmia latifolia ‘Nathan Hale’ Nathan Hale Mountain Laurel 5 Gal.., 7' O.C. Container (N-E) 
Knm # 6  Kalmia latifolia ‘Nipmuck’  Nipmuck Mountain Laurel  3 Gal.., 4' O.C. Container (N-E) 
Klk # 7  Kalmia latifolia ‘Keepsake’  Keepsake Mt. Laurel  3 Gal.., 5' O.C. Container (N-E) 
Las # 14  Leucothoe axillaris ‘Squirt’  Squirt Coast Leucothoe 2 Gal., 2.5' O.C. Container (N-E) 
Lfr # 9  Leucothoe fontanesiana ‘Rainbow’ Rainbow Leucothoe  3 Gal., 4' O.C.  Container (N-E) 
Mca # 12  Muhlenbergia capillaris Muhly Grass   1 Gal., 3’ O.C.  Container (N-E) 

Page 37

Marc S. Nelson, MPA George K. McGregor, AICP
Town Manager Director
PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT
933 Hopmeadow St. Tel. (860) 658-3245 
Simsbury, CT 06070 gmcgregor@simsbury-ct.gov 
STAFF REPORT MEMORANDUM 
To:  Simsbury Zoning Commission 
From: George K. McGregor, AICP 
Date:  July 20, 2026 
Subject: ZC 26-18, Dorset Crossing Zone Change/Master Plan  
ZC 26-19, 10 Dorset Crossing Site Car Wash Site Plan 
ZC #26-18, An application of Dorset Crossing LLC, Owner, Dwight Merriam, Agent, 
pursuant to Section 8 of the Zoning Regulations for a zone change and amendment 
to the Master Development Plan to allow a car wash facility at 10 Dorset Crossing 
(Assessor’s Map Block Lot I04 403 13C-F), Planned Area Development (PAD) Zone. 
ZC 26-19, An application of Dorset Crossing LLC, Owner, Dwight Merriam, Esq. 
Applicant, for a site plan approval to develop a 7,275 sq. ft. car wash facility at 10 
Dorset Crossing (Assessor’s Map Block Lot I04 403 13C-F), Planned Area 
Development (PAD) Zone. 

Page 38

2 
This staff report is a joint staff report for the zone change/master plan amendment 
and site plan.  
Master Plan Amendment/Zone Change 
Dorset Crossing is a Planned Area Development (PAD), established in 2013 with a 
mix of commercial and residential uses. The project was amended in 2022 and 2023 
and currently allows 27,000 sq.ft. of commercial and 360 multi-family residential 
homes. The development is partially constructed: 
Use Type LOT Density Constructed 
Mixed Use Retail/Medical Office A 15,000 sf Yes 
Residential Multi-Family B 168 units Yes 
Special Needs Multi-Family C 48 units Yes 
Residential Multi-Family D 30 units NO 
Mixed Use/Retail F 12,000 sf NO 
Residential Multi-Family G 42 units NO 
Residential Multi-Family H 72 units NO 
The Applicant proposes to amend the area described as “Lot F” by replacing two 
proposed buildings (12,000 sq.ft. of “retail/office”) with a 7,275 sq.ft. car wash 
facility. A “car wash” is defined separately in the zoning regulations and is not 
generally included along with other retail uses. Thus, the amendment to add the 
use constitutes a Master Development Plan change. 
Current conceptual plan alongside proposed: 
Having completed the first stage, a preliminary, non-binding review, the application 
is now a Master Plan/Zone Change application with a corresponding Site Plan. With 

Page 39

3 
this submission the Applicant requests formal review and action. The Application 
was accepted on July 6, 2026, and will be forwarded for referral to the Planning 
Commission (July 14, 2026) and the Design Review Board (July 20, 2026).  
The application is scheduled for a public hearing at the Zoning Commission on July 
20, 2026.  The master plan submission includes a site plan, traffic study, 
architectural elevations and other relevant materials. 
The property is zoned PAD and is in an Aquifer Protection District. A car wash is a 
permitted, unregulated activity in the aquifer district so long as “all waste waters 
from such activity are lawfully disposed of through a connection to a publicly owned 
treatment works.”1
Staff Review and Analysis-Master Plan Amendment 
Dorset Crossing is designated by the Plan of Conservation and Development 
(POCD) as a “Special Zone,” based on its mixed-use, Planned Area Development 
1 Aquifer Protection Area Regulation p.6 

Page 40

4 
Zoning. PADs are mixed use developments holding both residential and 
nonresidential components. The master plan for the Dorset Crossing development 
identifies this subject parcel for “retail/office” uses. An amendment allowing a car 
wash facility to be developed in lieu of retail or office is generally consistent and 
appropriate for the development. The car wash use is also consistent with the 
POCD which supports mixed-use development in this location. 
Site Plan Review 
The Applicant proposes to develop a 7,275 sq.ft. car wash facility at 10 Dorset 
Crossing. The project is subject to Section 8.1 (PAD regulations) and Section12 (Site 
Plan Regulations) of the Zoning Regulations. Accompanying and in support of the 
application the Applicant has submitted: 
 Site Plan (w/ drainage, stormwater, utilities, lighting, etc....) 
 Architectural Elevations 
 Traffic Study 
 Landscaping Plan 
 Narrative and ongoing responses to identified issues. 

Page 41

5 
The car wash proposed is a multi-faceted facility. Elements on site include an 
automated drive through car wash, separate self-service car wash bays, detailing 
options, and vacuum stations. Access to the site will be via an internal unnamed 
Dorset Crossing street; no direct access is planned to Dorset Crossing Drive or 
Hopmeadow St. 
The facility plans 24-hour operations, with the self-service bays open after the 
attended car wash tunnel closes. The Planning Commission questioned the 
necessity of being open 24 hours and the lighting impacts of such hours. The 
Applicant proposes to review these impacts after one year in operation2. 
The Applicant has submitted a traffic study detailing the impacts of the amendment 
and site plan on traffic generation and turning movements. The proposed scenario 
represents an overall reduction in trip generation from both the original approval 
and recent revisions due to the reduction in commercial and increase in residential 
units. Nonetheless, a car wash does present some challenges as the peaks traffic 
activity can vary from other commercial uses and on-site queuing must be 
considered (the queue as shown is +-18 cars). We note the Level of Service (LOS) C 
under certain turning movements. Staff asks the applicant to confirm whether 
the Level of Service C exists today or is decreased from B due to this 
application. 
The Application contains a comprehensive landscaping plan with the focus on 
supplementing screening along Hopmeadow St. Additionally, street trees and on-
site foundation plantings are offered. Native species are intended at 100%. 
Referral, Staff Review, and Analysis 
Specific review comments from individual referral agencies are attached to this 
report: 
Planning Commission-The Planning Commission will review the Application on 
July 14, 2026. During previous informal sessions the Commission requested 
information related to traffic impacts, hours of operation, water service availability, 
and drought implications over water usage  
Design Review Board-The DRB will review this application for a formal 
recommendation on July 20, 2026. During previous informal sessions, the DRB was 
broadly supportive of the architectural design and site plan. 
2 See Applicant “Car Wash Action List” #4, attached to Staff Memorandum 

Page 42

6 
Fire Marshal-The Fire Marshal has requested a widening of internal drive aisles, 
along with other options, for fire safety and access reasons. The Applicant is 
considering site revisions to meet this requested standard. 
Planning Staff-Planning Staff has requested additional information related to 
waster service capacity from Aquarion; engineering wastewater reporting; industry-
related standards for water recycling; lighting standards; wall sign information; 
hours of operation; and standard sheet information for site plan applications. Staff 
and the Applicant are working to address these issues. 
Town Engineer-The Town Engineer concurs with Planning that a wastewater 
engineering report, as required by the zoning regulations, be submitted. The Town 
Engineer, in a memo dated July 14, 2026, requested minor clarifications. No 
additional outstanding issues have been identified. 
Town Police Department-No outstanding issues identified. 
Staff and the Applicant are working to gather additional information requested and 
resolve outstanding issues. Staff and the Applicant agree on a recommendation to 
continue site plan review at the commission’s September 9, 2026, regular meeting. 

Page 43

7 
Draft Motions 
Zone Change/Master Plan Amendment 
MOVED, The Zoning Commission APPROVES Application ZC 26-18 of Dorset 
Crossing LLC, owner, Dwight Merriam Esq., applicant, for formal Application 
Review to amend the Master Development Plan at Dorset Crossing to include a Car 
Wash Facility at 10 Dorset Crossing, based on a finding that: 
The master plan for the Dorset Crossing development identifies this subject 
parcel for “retail/office” uses. An amendment allowing a car wash facility to be 
developed in lieu of retail or office is generally consistent and appropriate for 
the development. The car wash use is also consistent with the POCD which 
supports mixed-use development in this location. 
The Approval is subject to the following conditions: 
1. Zone Change/Master Plan Amendment shall be developed in substantial 
conformance to the Dorset Crossing PAD Master Development Plan dated 
April 30, 2026, REVISED June 26, 2026 
The Zone Change/Master Plan is effectively immediately, subject to the standard 
appeal period. 
OR 
Alternate Motion 
Site Plan 
MOVED, the Zoning Commission FORWARDS ZC 26-19, An application of Dorset 
Crossing LLC, Owner, Dwight Merriam, Agent, for a site plan approval to develop a 
7,275 sq. ft. car wash facility at 10 Dorset Crossing to the regular meeting on 
September 9, 2026. 
OR 
Alternate Motion 

Page 44

 
 
 
 
Marc S. Nelson, MPA  Thomas J. Roy, P.E. 
Town Manager  Director of Public Works 
  Town Engineer 
 
 
 
DEPARTMENT OF PUBLIC WORKS – ENGINEERING DIVISION 
 
 
https://ct-simsbury.civicplus.com  Mon. (8:30am-7:00pm) Tel. (860) 658-3260 
933 Hopmeadow Street Tue. Wed. Thu. (8:30am-4:30pm) Fax. (860) 658-3205 
Simsbury, CT 06070 Fri. (8:30am-1:00pm) akessler@simsbury-ct.gov 
 
MEMORANDUM 
 
To:  George K. McGregor, AICP, Dir. of Community Planning and Development 
From:  Adam D. Kessler, P.E., Deputy Town Engineer 
cc:   
Date:  July 14, 2026 
Subject: Engineering Comments - #10 Dorset Crossing 
  Proposed Diamond Sparkle Car Wash, LLC 
  ZC 26-18 & ZC 26-19 
   
 
 
The Engineering Department has reviewed the documents submitted as part of the Site Modification 
Application for the development of #10 Dorset Crossing as a Diamond Sparkle Car Wash. Documents 
were received by this department on June 30, 2026: 
1. Site plan set entitled “Dorset Crossing Pad Master Development Plan, Site Modification – Lot F”, 
prepared for Dorset Crossing LLC, prepared by YRC, dated March 20, 2025, revised through June 
26, 2026. 
2. Stormwater report entitled “Master Plan Development, Stormwater Management Report, Site 
Modification – Lot F, Proposed Diamond Sparkle Car Wash”, prepared for Diamond Sparkle Car 
Wash, LLC prepared by YRC, dated June 29, 2026. 
Applicant shall respond to all comments in writing and note any and all revisions made to the design 
plans and supporting reports. In consideration of the documents submitted as of the date of this review 
memorandum, we offer the following: 
1. Please copy this office with all permit applications submitted to state agencies related to this 
project. 
2. Please provide final construction plans for the record and reference during construction. 
3. Provide a turning movement study to demonstrate acceptable site access for fire apparatus.  
4. Provide details related to the proposed improvement including but not limited to pavement 
sections, drainage and utilities. 
5. Provide an inspection report of the existing drainage infrastructure that will receive runoff from 
this development. Pre‐construction inspection will provide a baseline condition of the existing 

Page 45

Engineering Comments 
May 5, 2026 
Page 2 of 2 
 
system to ensure all parties, including the Town, are aware of the condition. It is recommended 
to remove any accumulated sediment or debris from existing structures downstream of the 
improvements before construction and following construction. 
6. Please review Table 3 of the Traffic Impact Statement for accuracy. The SB Thru Queue during 
the Saturday Peak Hour is “#572”. Is this an error? Or does the “#” symbol refer to a note 
elsewhere in the report? 
7. While the level of service at the Dorsett Crossing intersection with Hopmeadow Street remains 
acceptable, the level of service degrades with each new development. Please note that 
additional development in the future may require further study of traffic impacts and 
mitigations to maintain LOS C or better. 
8. Facility connection charge and permit from the Simsbury WPCA are required to connect to the 
existing sanitary sewer lateral.  

Page 46

Archived: Tuesday, July 14, 2026 8:04:36 AM
From: Patrick T. Tourville, CFI I 
Sent: Thu, 2 Jul 2026 11:20:12
To: McGregor George 
Subject: Re: ZC 26-18 10 Dorset Crossing Master development plan
Importance: Normal
Sensitivity: None
External sender <ptourville@simsburyfd.org> 
Make sure you trust this sender before taking any actions.
Fire Department access roads need to be 20 feet wide. The roads around perimeter are only 13 feet, and the entry shows 18
feet per lane. If the main entry exit is not blocked with any islands or barriers this would be ok.  
Patrick Tourville CFI-I
Fire Marshal
Chief of Fire Prevention
Simsbury Fire District 
871 Hopmeadow Street
Simsbury, CT 06070
Office  860.658.1973
Cell 860.818.0479
From: McGregor George <gmcgregor@simsbury-ct.gov>
Sent: Wednesday, July 1, 2026 10:21 AM
To: Patrick T. Tourville, CFI I <PTourville@simsburyfd.org>; nboulter <nboulter@pd.simsbury-ct.gov>; Davis Chris
<cdavis@pd.simsbury-ct.gov>
Subject: ZC 26-18 10 Dorset Crossing Master development plan
 
Attached are relevant info for the FINAL Master Plan Site Plan for the Car Wash.
 
If you have comments please provide by Friday July 10.
 
I am waiting on a electronic traffic study and will forward when I get.
 
George
 
 
 
George K. McGregor, AICP
Planning & Community Development Director
Town of Simsbury
933 Hopmeadow Street
Simsbury, CT 06070
P(860) 658 3252
gmcgregor@simsbury-ct.gov

Page 47

         
The Planning and Community Development Department has been made aware of fraudulent emails containing false
invoices for land use applications.  If you receive a suspicious email, we urge you to contact us at 860-658-3252.
 

Page 48

Archived: Tuesday, July 14, 2026 8:04:47 AM
From: Davis Chris 
Sent: Mon, 13 Jul 2026 15:57:11
To: McGregor George Boulter Nicholas (SPD) 
Subject: RE: car was site plan and traffic study
Importance: Normal
Sensitivity: None
Warning: Unusual sender <cdavis@pd.simsbury-ct.gov> 
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.
I don’t have any concerns with it.
 
Thank you!
 
 
____________________
Christopher A. Davis
Deputy Chief of Police
Simsbury Police Department
(860) 658-3104
 
       
 
From: McGregor George <gmcgregor@simsbury-ct.gov> 
Sent: Monday, July 13, 2026 11:17 AM
To: Boulter, Nicholas <NBoulter@pd.simsbury-ct.gov>; Davis Chris <CDavis@pd.simsbury-ct.gov>
Subject: car was site plan and traffic study
 
Y o u  g u y s  h a v e  a n y  c o m m e n t s  o n  t h is  a p p lic a t io n ?  I  s e n t  in f o   t w o  w e e k s  b a c k  o r  s o    G e o r g e  K .  M c G r e g o r ,  A I C P  P la n n in g  &  C o m m u n it y  D e v e lo p m e n t  D ir e c t o r  T o w n  o f  S im s b u r y  9 3 3  H o p m e a d o w  S t r e e t  S im s b u r y ,  C T  0 6 0 7 0  P ( 8 6 0 )  6 5 8  3 2 5 2  g m c g r e g o r @ s im s b u r y - c t . g o v   
External sender <gmcgregor@simsbury-ct.gov> 
Make sure you trust this sender before taking any actions.
You guys have any comments on this application? I sent info  two weeks back or so
 
George K. McGregor, AICP
Planning & Community Development Director
Town of Simsbury
933 Hopmeadow Street
Simsbury, CT 06070
P(860) 658 3252
gmcgregor@simsbury-ct.gov
 
         

Page 49

The Planning and Community Development Department has been made aware of fraudulent emails containing false
invoices for land use applications.  If you receive a suspicious email, we urge you to contact us at 860-658-3252.
 

Page 50

Car Wash Action List 2026-07-09 
1. The zoning use list definition asks for a “report from a professional engineer on the 
disposal and impact of wastewater and cleaning products…” I find no such report in the 
submission. 
Client has engaged an expert consultant. 
2. The plan set labeled “PAD” Submission contains sheets generally used for a site plan 
submission. Is the plan to use this PAD submission for the site plan as well? I have asked 
Town Engineering for their input on this. It shall meet Section 11. 
Yes, we have assumed that the master plan amendment typically includes the site 
plan, but it may be better for the town and the applicant if there is a separate site plan 
application later after receipt of additional information requested from others.. 
Addressing Section 11 requirements may have to come later. 
3. There is a document labeled “PAD Master Plan Submission; Development Narrative” 
which starts with a “9. “ Entry related to landscaping. This item appears isolated and is 
perhaps part of a larger document? It is unclear. 
Resolved. 
4. Hours of operation. As discussed during preliminary review and raised by the Planning 
Commission, please confirm intended hours of operation for all services on site. Also, 
please address site lighting impacts as it relates to hours of operation. 
If the self-service car wash operation is to be open after the attended car wash tunnel is 
closed, some lighting will remain on. The reduction in lighting is indicated on the site plans. 

Page 51

As to hours of operation, many people are on shift work, particularly in health services 
where they are 24/7 and employees go in and out day and night. The experience in 
Colchester is that 15% of customers use the facility between 11 PM and 5 AM.  
The proposal is to be open 24/7 with a condition requiring the developer to return one year 
after commencing operations for a review of the lighting and the operation. 
The developer will pay the cost of an independent lighting consultant and planner or traffic 
engineer to review the lighting and the impact of the operation. 
If 24/7 operations are unsatisfactory to the Zoning Commission in its sole discretion, the 
approval would be amended to limit the hours of operation to 5 AM to 11 PM with the site 
fully shut down from 11:00 PM to 5:00 AM. 
With that year of experience, the developer can adjust the lighting to provide safe access 
while minimizing the light and have the operating experience to assess the extent to which 
the public need is being met with no adverse impacts.
5. As raised during the PC review, please address water usage and service availability from 
Aquarion High usage is a concern of commissioners. 
A request was made to Aquarion to confirm the availability to service the proposed 
use. They have not responded. They have said they will be providing a 1.5-inch service 
from the 4-inch line. 

Page 52

6. Please provide a broader description and narrative related to proposed water recycling 
efforts as they relate to industry standards and best practices. The stated commitment 
to 30-40 percent seems low. 
An expert consultant has been engaged to provide the requested information. The 
developer is awaiting information from the equipment provider.  
7. Traffic Study includes the Hotel. It is not part of the Dorset Crossing PAD, but I guess can 
be helpful vis a vis comparison for trip generation under different scenarios. 
The traffic engineer agrees it is useful information. 
8. Please specify the color temperature of the pole lights proposed and adjust the shielding of the 
fixtures at the northern property line. They are limited to 3,000 Kelvin and cannot measure 
more than 0.5 FC at the property line under the outdoor lighting regulations.
See Lighting Statement 2 and Note 1. The specified lights are 3000K.  As for the 0.5 fc at the 
property line, a question is raised as to its applicability in a  PAD with common lot lines where the 
abutter and driveway lights are physically on our property and illuminating other properties.
9. Please confirm no signs are proposed currently. If wall signs or freestanding signs are intended, 
please provide appropriate plans and specifications.
Wall signs are as shown on the site plan and architectural renderings. Details on 
materials and lighting are forthcoming.  There is a freestanding sign facing Dorset 
Crossing Drive; details forthcoming. 
Added items: 
1. Fire marshal’s drive lane widths. 
Redesign in process.  

Page 53

Page 54

Page 55

Site Plant Schedule; 100% Native By Variety: 100% Native By Amount: 
Key Quantity Botanical Name  Common Name  Size Installed Comments 
Street / Shade / Ornamental Trees: 
Aag # 1  Acer rubrum ‘Armstrong Gold’   Armstrong Gold Maple 2” – 2-1/2" Cal., 10’ O.C. B & B (N) 
Arr # 2  Acer rubrum ‘Redpointe’    Redpointe Maple 2” – 2-1/2" Cal., 30’ O.C. B & B (N) 
Axa # 1  Acer x freemani ‘Armstrong’  Armstrong Freeman Maple  2” – 2-1/2" Cal., 15’ O.C. B & B (N) 
Alu # 2  Amelanchier laevis ‘Lustre’  Lustre Alleg. Serviceberry  2” – 2-1/2" Cal., 15’ O.C. B & B (N) 
Coc # 2  Celtis occidentalis  Hackberry  2” – 2-1/2" Cal., 40’ O.C. B & B (N) 
Cbh # 1  Cercis canadensis ‘Burgundy Hearts’ Burgundy Hearts Eastern Redbud 2” – 2-1/2" Cal., 25’ O.C. B & B (N)
Lss # 2  Liquidamber sty.‘Slender Silhouette’ Slender Silhouette Sweetgum  2” – 2-1/2" Cal., 6’ O.C. B & B (N) 
Lha # 1  Liquidamber styraciflua ‘Hapdell’ Hapdell Sweetgum  2” – 2-1/2" Cal., 30’ O.C. B & B (N) 
Nwf # 1  Nyssa sylvatica ‘Wildfire’  Wildfire Black Tupelo 2” – 2-1/2" Cal., 25’ O.C. B & B (N) 
Qpb # 2  Quercus pal. ‘Pacific Brilliance’ Pacific Brilliance Pin Oak  2” – 2-1/2" Cal., 25’ O.C. B & B (N)  
Qco # 2    Quercus coccinea  Scarlet Oak  2” – 2-1/2" Cal., 45’ O.C. B & B (N) 
Uap # 1  Ulmus americana ‘Princeton’  American Elm  2” – 2-1/2” Cal., 40’ O.C. B & B (N) 
Evergreen Trees:
Ish # 1  Ilex opaca ‘Satyr Hill’  Satyr Hill Holly 6’ – 7’ Ht., 13’ O.C.  B & B (N-E) 
Shrubs / Ornamental Grasses:
Ape # 8  Azalea periclymenoides Pinxterbloom Azalea  3 Gal., 4.5' O.C. Container (N) 
Bba # 19  Bouteloua gra. ‘Blonde Ambition’ Blonde Ambition Gramma  1 Gal., 2.75’ O.C.  Container (N) 
Cla # 9  Chasmanthium latifolium  Northern Sea Oats  1 Gal., 2’ O.C.  Container (N) 
Cse # 2  Cornus sericea ‘Arctic Fire’   Arctic Fire Dogwood  3 Gal, 4' O.C.  Container (N) 
Gba # 13  Gaylussacia baccata  Black Huckleberry  2 Gal., 2.5’’ O.C.  Container (N) 
Igd # 4  Ilex glabra ‘Densa’   Dense Inkberry Holly  3 Gal., 6’ O.C.  Container (N-E) 
Jgc # 5  Juniperus communis ‘Gold Cone’  Gold Cone Juniper  3 Gal., 2.75' O.C Container (N-E) 
Jhg # 5  Juniperus horizon. ‘Golden Carpet‘ Golden Carpet Juniper 2 Gal., 3.5' O.C. Container (N-E) 
Jyt # 4  Juniperus hor. ‘P.C. Youngstown’ Youngstown Juniper  2 Gal., 5' O.C.  Container (N-E) 
Kau # 15  Kalmia augustfolia  Sheep Laurel  2 Gal., 4' O.C.  Container (N-E) 
Knh # 4  Kalmia latifolia ‘Nathan Hale’ Nathan Hale Mountain Laurel 5 Gal.., 7' O.C. Container (N-E) 
Knm # 6  Kalmia latifolia ‘Nipmuck’  Nipmuck Mountain Laurel  3 Gal.., 4' O.C. Container (N-E) 
Klk # 7  Kalmia latifolia ‘Keepsake’  Keepsake Mt. Laurel  3 Gal.., 5' O.C. Container (N-E) 
Las # 14  Leucothoe axillaris ‘Squirt’  Squirt Coast Leucothoe 2 Gal., 2.5' O.C. Container (N-E) 
Lfr # 9  Leucothoe fontanesiana ‘Rainbow’ Rainbow Leucothoe  3 Gal., 4' O.C.  Container (N-E) 
Mca # 12  Muhlenbergia capillaris Muhly Grass   1 Gal., 3’ O.C.  Container (N-E) 

Page 56

A3.01
A3.1
2
A3.0 2
A3.1
1
30' - 0"15' - 0"22' - 0"14' - 8"11' - 4"
6' - 0"
4' - 0"
45' - 0" 38' - 0" 24' - 0"
2' - 0" 6' - 0"
10' - 0" 26' - 0" 19' - 0" 70' - 0"
30' - 0"15' - 0"EQEQ14' - 8 1/2"25' - 4"
125' - 0"
107' - 0"
4' - 8"
AUTOMATIC SOFT TOUCH
AUTOMATIC TOUCHLESS
OVERSIZE SELF-
SERVICE
SELF-SERVICE
DETAILING BAYS
EQUIPMENT ROOM
OFFICE
22' - 2"
29' - 2"
N
195 Scott Swamp Road
Farmington, CT 06032
qamarch.com
Issue Dates:
Project #:
NOT FOR CONSTRUCTION 
ISSUED FOR REVIEW ONLY
E:\REVIT LOCAL\DSCW Mdl2_rpetitto.rvt6/29/2026 4:32:20 PM
A1.1
FIRST FLOOR PLAN
MUNICIPAL REVIEW
05.04.2026
QAM25090
DIAMOND
SPARKLE CAR
WASH
PROJECT DESCRIPTION:
SIMSBURY, CT
Revisions

Page 57

8 1/2" / 1'-0" 8 1/2" / 1'-0"
1'-1" / 1'-0"
1'-1" / 1'-0"
8 1/2" / 1'-0"8 1/2" / 1'-0"
8 1/2" / 1'-0"
8 1/2" / 1'-0"8 1/2" / 1'-0"
8 1/2" / 1'-0" 8 1/2" / 1'-0"
1'-1" / 1'-0"
1'-1" / 1'-0"
1'-1" / 1'-0"
1'-0" / 1'-0"1'-0" / 1'-0"
1'-1" / 1'-0"
9" / 1'-0"
9" / 1'-0"
ARCHITECTURAL ASPHALT SHINGLES
ALUMINUM GUTTER TYP
ALUMINUM GUTTER TYP
ALUMINUM GUTTER TYPALUMINUM GUTTER TYP
ALUMINUM GUTTER TYP
ARCHITECTURAL ASPHALT SHINGLES
ARCHITECTURAL ASPHALT SHINGLES
STANDING SEAM METAL ROOFING
N
195 Scott Swamp Road
Farmington, CT 06032
qamarch.com
Issue Dates:
Project #:
NOT FOR CONSTRUCTION 
ISSUED FOR REVIEW ONLY
E:\REVIT LOCAL\DSCW Mdl2_rpetitto.rvt6/29/2026 4:32:23 PM
A1.4
ROOF PLAN
MUNICIPAL REVIEW
05.04.2026
QAM25090
DIAMOND
SPARKLE CAR
WASH
PROJECT DESCRIPTION:
SIMSBURY, CT
Revisions
1/8" = 1'-0"A1.4
1 ROOF PLAN

Page 58

ARCHITECTURAL ASPHALT SHINGLES
ALUMINUM GUTTER TYP
STANDING SEAM 
METAL ROOFING
WHITE PVC TRIM TYP
WHITE PVC TRIM TYP
SPLIT FACED CMU TYP
BOARD AND BATTEN 
VINYL SIDING AT 
GABLE INSETS TYP
HARDIE CLAPBOARD 
SIDING
BOARD AND BATTEN 
VINYL SIDING AT 
GABLE INSETS TYP
ALL SIGNAGE 
SHOWN AT 1'6" HIGH
TO MIDPOINT
26' - 7" FROM GRADE
ARCHITECTURAL ASPHALT SHINGLES
ALUMINUM GUTTER TYP
STANDING SEAM 
METAL ROOFING
WHITE PVC TRIM TYP
WHITE PVC TRIM TYPSPLIT FACED CMU TYP
BOARD AND BATTEN 
VINYL SIDING AT 
GABLE INSETS TYP
HARDIE CLAPBOARD 
SIDING
BOARD AND BATTEN 
VINYL SIDING AT 
GABLE INSETS TYP
ALL SIGNAGE 
SHOWN AT 1'6" HIGH
14' - 0" TYP
N
195 Scott Swamp Road
Farmington, CT 06032
qamarch.com
Issue Dates:
Project #:
NOT FOR CONSTRUCTION 
ISSUED FOR REVIEW ONLY
E:\REVIT LOCAL\DSCW Mdl2_rpetitto.rvt6/29/2026 4:32:25 PM
A3.0
ELEVATIONS
MUNICIPAL REVIEW
05.04.2026
QAM25090
DIAMOND
SPARKLE CAR
WASH
PROJECT DESCRIPTION:
SIMSBURY, CT
Revisions
1/8" = 1'-0"A3.0
1 ENTRY (EAST)
1/8" = 1'-0"A3.0
2 EXIT/DETAIL BAY (WEST)

Page 59

ENTER ENTER ENTER EXIT
ARCHITECTURAL ASPHALT SHINGLES
ALUMINUM GUTTER TYP
STANDING SEAM 
METAL ROOFING
WHITE PVC TRIM TYP
WHITE PVC TRIM TYPSPLIT FACED CMU TYP
BOARD AND BATTEN 
VINYL SIDING AT 
GABLE INSETS TYP
HARDIE CLAPBOARD 
SIDING
BOARD AND BATTEN 
VINYL SIDING AT 
GABLE INSETS TYP
ALUMINUM STOREFRONT TYP
ENTEREXIT
ARCHITECTURAL ASPHALT SHINGLES
ALUMINUM GUTTER TYP
STANDING SEAM 
METAL ROOFING
WHITE PVC TRIM TYP
WHITE PVC TRIM TYPSPLIT FACED CMU TYP
HARDIE CLAPBOARD 
SIDING
BOARD AND BATTEN 
VINYL SIDING AT 
GABLE INSETS TYP
ALUMINUM STOREFRONT TYP
WHITE PVC 
TRIM TYP
N
195 Scott Swamp Road
Farmington, CT 06032
qamarch.com
Issue Dates:
Project #:
NOT FOR CONSTRUCTION 
ISSUED FOR REVIEW ONLY
E:\REVIT LOCAL\DSCW Mdl2_rpetitto.rvt6/29/2026 4:32:27 PM
A3.1
ELEVATIONS
MUNICIPAL REVIEW
05.04.2026
QAM25090
DIAMOND
SPARKLE CAR
WASH
PROJECT DESCRIPTION:
SIMSBURY, CT
1/8" = 1'-0"A3.1
2 TOUCHLESS/SELF SERVICE BAY (NORTH)
1/8" = 1'-0"A3.1
1 OFFICE/MECH ROOM (SOUTH)
Revisions

Page 60

MASTER DEVELOPMENT PLAN 
STORMWATER MANAGEMENT REPORT 
SITE MODIFICATION - LOT F 
PROPOSED DIAMOND SPARKLE CAR WASH 
10 DORSET CROSSING 
SIMSBURY, CT 
PREPARED FOR 
APPLICANT 
DIAMOND SPARKLE CAR WASH, LLC 
359 LEBANON AVENUE 
COLCHESTER, CT 06415 
DATE: JUNE 29, 2026 
REVISED: 

Page 61

Page 62

   DIAMOND SPARKLE CAR WASH 
 10 DORSET CROSSING 
 SIMSBURY, CONNECTICUT 
 
  
 
 
 TOC 
TABLE OF CONTENTS  
APPLICANT / SITE INFORMATION ...................................................................................................... 1 
PROJECT DESCRIPTION AND PURPOSE ............................................................................................ 1 
DESCRIPTION OF EXISTING SITE ....................................................................................................... 2 
STORMWATER MANAGEMENT .......................................................................................................... 2 
 SUMMARY OF APPLICABLE DESIGN CRITERIA .................................................................... 2 
 SUMMARY OF LID TO REDUCE STORMWATER RUNOFF AND POLLUTANTS ............... 3 
 STRUCTURAL STORMWATER BMP TREATMENT AND POLLUTANT REMOVAL .......... 3 
 PEAK FLOW CONTROL ................................................................................................................ 4 
 PEAK FLOW CALCULATIONS .................................................................................................... 5 
 CONCLUSION ................................................................................................................................. 5 
CONSTRUCTION EROSION AND SEDIMENT CONTROL ................................................................ 5 
OPERATION AND MAINTENANCE ...................................................................................................... 5 
TABLES 
TABLE 1: PROPOSED TREATMENT SUMMARY ............................................................................... 4 
TABLE 2: PEAK FLOW COMPARISON ................................................................................................ 5 
APPENDICES 
A. DRAINAGE MAPS 
B. HYDROLOGIC CALCULATIONS 
C. TREATMENT CALCULATIONS 
D. SUPPLEMENTAL DATA 
 
 

Page 63

Page 64

 DIAMOND SPARKLE CAR WASH 
 10 DORSET CROSSING 
 SIMSBURY, CONNECTICUT 
1 
APPLICANT / SITE INFORMATION 
OWNER APPLICANT 
Dorset Crossing LLC Diamond Sparkle Car Wash, LLC 
30 Dorset Crossing 359 Lebanon Avenue 
Simsbury, CT 06070 Colchester, CT 06415 
SITE 
Map I04, Block 403, Lot 13-C-F 
10 Dorset Crossing 
Simsbury, CT 
PROJECT DESCRIPTION AND PURPOSE  
Diamond Sparkle Car Wash, LLC proposes to construct a new car wash facility and as sociated site 
improvements on a vacant 1.08-acre parcel of land located at 10 Dorset Crossing to the northwest of 
the intersection of Dorset Crossing and Hopmeadow Street (Route 10 & 202)  in Simsbury, CT. The 
parcel is identified as Map I04, Block 403, Lot 13-C-F on Town of Simsbury Tax Assessor Mapping 
and is depicted as “Lot F” on a plan entitled “Master Development Plan Prepared for Dorset Crossing, 
LLC, Dorset Cr ossing Drive, Simsbury, Connecticut ”, Sheet MA -1, Date : 12-03-2021 as Revised 
Through 09- 22-2023, Scale: 1” = 100’, prepared by F.A. Hesketh & Associates, Inc. The above-
described parcel is hereinafter referred to as “Site”. 
Lot F was originally approved sometime prior to 2012 for a 14,000 square foot retail building as part 
of a Planned Area Development. In 2023 Lot F was approved for a 10,000 square foot mixed use retail/ 
office building and a 2,000 square foot mixed use retail /office building modification  to the original 
PAD.  
The proposed car wash facility will consist of the construction of a 7,275 square-foot single-story 
building with automatic, touchless, and self-serve wash bays, detail bays, equipment room, and office 
space. Main access will be provided from an existing driveway serving the PAD to the west via a new 
connection. 
The full development will include the following improvements: 
• 7,275 sf car wash building 
• Automatic tunnel pay canopy 
• 36’ wide primary access driveway with single ingress and egress lanes 
• 24’ internal driveways serving parking areas and queuing lanes 
• 13’ wide perimeter bypass lane 
• 16 parking spaces including ADA, standard, and vacuum 
• Internal pedestrian sidewalks 
• Pole-mounted area lighting of driveways and parking areas 
• Stormwater management systems connecting to the existing PAD drainage facilities 
• Sanitary sewer lateral connection to the existing main in the westerly PAD driveway 
• Domestic water service connections to the existing stubs at the northwest corner of the Site 
• Electric and telecommunication utility connections to the existing facilities on Site 

Page 65

 DIAMOND SPARKLE CAR WASH 
 10 DORSET CROSSING 
 SIMSBURY, CONNECTICUT 
2 
This stormwater management report has been prepared by Brandon Handfield, PE, a professional 
engineer licensed in the State of Connecticut with Yantic River Consultants, LLC (YRC) and provides 
a comprehensive evaluation of the developed car wash Site as compared to approved PAD conditions. 
This report concludes that; approved PAD drainage patterns will be generally maintained, there will 
be zero net increase in p eak flow rates connecting to the existing PAD drainage systems , and 
stormwater will be retained and treated to the maximum extent achievable in accordance with the 2023 
DEEP Stormwater Quality Manual and the original PAD design intent. 
DESCRIPTION OF EXISTING SITE  
The existing 1.08-acre Site is currently undeveloped.  
TOPOGRAPHY – Topography of the parcel consists of a high point along the northern boundary and 
gently sloping to the south towards Dorset Crossing. The existing slopes are flat to moderate ranging 
from 2% to 5%. 
SOILS – The USDA NRCS Web Soil Survey depicts the  Site within two soil types, Merrimac fine 
sandy load (34A) to the southeast and Hinckley loamy sand  to the north and west. Both soil  types 
have a Hydrologic Soil Group (HSG) rating of A and are well-drained. 
VEGETATION – Vegetation consists of maintained lawn area. There are no mature trees or shrubs. 
DRAINAGE – Stormwater collection, treatment, and attenuation systems were installed as part of the 
initial phases of the PAD development, including on and/or adjacent to the Site. These systems appear 
to be in general conformance with a plan obtained by YRC entitled “Utility Plan Prepared for Dorset 
Crossing, Hopmea dow Street, Simsbury, Connec ticut”, Sheet UT -1, Date : 09-16-2011 as R evised 
Through 10/10/11, Scale : 1 ” = 40 ’, Pre pared by F.A. Hesketh & Associates, Inc. YRC has also 
obtained construction submittals documenting proprietary stormwater treatment and subsurface 
detention measures installed on the Site. 
The Site generally drains to two separate Syste ms designed and installed for the PAD developme nt. 
See Map DA-3-1 within Appendix A. 
• System #1 collects  runoff from the western half of the Site , developed portions of Lot A, 
developed portions of Lot F, and Dorset Crossing. This System discharges into Water Quality 
Basin #3 to the southwest. 
• System #2 receives runoff from the eastern hal f of the Site  and eastern  portion of Dorset 
Crossing at the intersect ion with Hopmeadow Street. This system discharges through a 
Contech STC 900 hydrodynamic separator and into a subsurface R etain-It detention syste m 
lined with an impermeable Dura-Skrim membrane, both of which are located on the Site within 
a drainage easement in favor of the Town of Simsbury. 
STORMWATER MANAGEMENT  
The following Standards were considered in the analysis and design. 
SUMMARY OF APPLICABLE DESIGN CRITERIA 
Hydrologic Design Criteria: TR-55 
Hydraulic Design Criteria: CTDOT Drainage Manual 

Page 66

 DIAMOND SPARKLE CAR WASH 
 10 DORSET CROSSING 
 SIMSBURY, CONNECTICUT 
3 
Climate Change Considerations: CT DEEP Stormwater Quality Manual 
Flood Hazard Areas: N/A 
Aquifer Protection Areas: Located within APA 
Treatment and Pollutant Removal: CT DEEP Stormwater Quality Manual  
Peak Flow Control Goal: Zero Net Increase in Peak Flow from Site 
SUMMARY OF LID TO REDUCE STORMWATER RUNOFF AND POLLUTANTS 
Low Impact Development techniques were implemented to the maximum extent achievable prior to 
the consideration of structural stormwater best management practices (BMP) in accordance with the 
2023 SQM. A li st of LID techniques implemented into the design  are provided below . It should be 
noted that as a conservative measure the design of the structural stormwater BMP does not take into 
consideration the hydrologic benefit of these measures.  
• Minimize clearing: There are no mature trees on the Site. Not applicable. 
• Minimize building footprint: The proposed car wash building has a footprint area of 7,275 sf, 
which is less tha n the original approved development and slightly larger tha n the 2023 
modification. The building footprint has been reduced to the greatest extent possible while still 
achieving the purpose of the project. 
• Minimize roadways , parking, and impervious surfaces: Access drivew ay and p arking 
quantities meet the minimum needs of the proposed car wash use.  Proposed impervious 
surfaces are approximately 90% of the 2023 modification. 
• Use of low maintenance landscaping: Low maintenance and 100% native plantings have been 
proposed by the project landscape architect. 
• Disconnection of impervious surfaces: This technique has not been employed due to the 
presence of the aquifer protection area. 
STRUCTURAL STORMATER BMP TREATMENT AND POLLUTANT REMOVAL 
The design approach selected for the project  meets the original design inte nt for the  PAD while 
incorporating measures in conformance with the 2023 SQM. Treatment will consist of the following: 
measures: 
System #1 
• Clean runoff from the proposed roof and yard drains within  adjacent landscaped islands will 
discharge to a subsurface Stormtech MC -3500 infiltration system. The proposed system can 
fully retain and infiltrate all storm events up to the 100-year storm. 
• New catch basins will be installed with 48 ” deep sumps and hoods. In accordance with 2023 
SQM Siting Considerations, each of these catch basins will be used in conjunction with other 
BMP’s (Water Quality Basin #3),  are in an offline configuration, and have contributing 
watersheds less than 0.25 acres. 
• The existing catch basin located at the southwest corner of the Site will remain unchanged and 
continue to discharge to the System #1 collection system . A comparison of calculated water 
quality volumes and flows was performed for the southwest catch basin. The increases in WQV 
and WQF are negligible and do not warrant further modification. 

Page 67

 DIAMOND SPARKLE CAR WASH 
 10 DORSET CROSSING 
 SIMSBURY, CONNECTICUT 
4 
System #2 
• Stormwater will be collected within existing catch basins  along the south and southeastern 
limits of the development  installed as part of the original PAD devel opment. The existing 
basins discharge through an existing Contech STC 900 hydrodynamic separator. The existing 
STC 900 structure can accommodate the minor increase in calculated water quality flow from 
the contributing watershed associated with the 2023 SQM. The STC-900 can also handle the 
calculated 10-year bypass flow. Modification or replacement is not warranted. 
 
The existing Stormwater Management System installed on Site in combination with the proposed 
improvements provides adequate treatment in accordance with the 2023 Stormwater Quality Manual 
to the maximum extent achievable. 
PEAK FLOW CONTROL 
Peak flow rates were calculated using TR -55 methodology. Hydrology Studio 2026 v.3.0.0.44 was 
used to generate peak flows with the following parameters for existing and proposed conditions: 
• DRAINAGE AREA:  Existing and proposed drainage areas were delineated based on approved 
plans, current topography, an d the proposed grading and drainage design . The same general 
discharge points and drainage patterns were maintained as compared to th e original approved 
development. See Appendix A for maps. 
• RAINFALL: Precipitation frequency and depth estimates (rainfall data) were obtained from 
NOAA Atlas 14, Volume 10, Version 3 at the Site geographic location. See Appendix D. 
• SOILS: The Site lies entirely within soils clas sified as  HSG A based on NRCS Web Soil 
Survey. See Appendix D. 
• CURVE NUMBER: Composite curve numbers (CN) were calculated based on the land cover 
types with consideration of the hydrologic soil groups and slopes. 
• TIME OF CONCENTRATION:  Both the approved and proposed development consists of 
short flow paths over mostly impervious surfaces. The minimum time of concentration (Tc) of 
5 minutes was used for both existing and proposed conditions. 
• EXFILTRATION: For the purposes of calculating infiltration of clean runoff from the 
proposed roof and surrounding lands caped areas, an infiltration rate of 2.41 inches /hour was 
used in accordance with Table 10-2 for Loamy Sand within HSG A. 
SQM AREA DA IA WQV WQF
Standard Label acre acre acre-ft cfs Method Vol Flow Area Note
2023 PR-102 ROOF 0.213 0.171 0.018 0.22 MC-3500 0.055 N/A N/A 100% WQV
2023 PR-200 1.140 0.792 0.083 1.03 STC 900 N/A 1.4 N/A 100% WQF
2023 PR-F-102 0.129 0.105 0.011 0.14 DEEP SUMP N/A N/A N/A <0.25 AC OK
2023 PR-F-301 0.177 0.139 0.015 0.18 DEEP SUMP N/A N/A N/A <0.25 AC OK
2004 EX-101 0.191 0.144 0.012 0.14 WQ BASIN #3 N/A N/A N/A Approved PAD
2023 EX-F100 0.138 0.126 0.013 0.16 WQ BASIN #3 N/A N/A N/A Negligible Change
PROPOSED TREATMENT
SQM TREATMENT SUMMARY TABLE
COMPARISON OF SITE DRAINING TO SYSTEM #1 (WQ BASIN #3) WITHOUT ON-SITE TREATMENT
TABLE 1: PROPOSED TREATMENT SUMMARY

Page 68

 DIAMOND SPARKLE CAR WASH 
 10 DORSET CROSSING 
 SIMSBURY, CONNECTICUT 
5 
 
PEAK FLOW CALCULATIONS  
A summary of flows (CFS) for existing and proposed conditions is provided below. 
 
As shown in the table above, peak flows discharging off site to System s #1 and #2 are lower than 
approved conditions. 
CONCLUSION 
The proposed development and stormwater management system will reduce peak flow rates 
discharging to the existing collection Systems #1 and #2 for the 1-year to 100-storm events, thereby 
meeting the zero net increase in stormwater runoff requirement. There are no anticipated adverse 
impacts on Dorset Crossing, Hopmeadow Street, or downstream properties. 
CONSTRUCTION EROSION AND SEDIMENT CONTROL  
A plan to control construction related impacts, including erosion, sedimentation, and other pollutant 
sources has been prepared in accordance with the 2023 Connecticut Guidelines for Soil Erosion and 
Sediment Control. The Erosion and Sediment Control Plan is included in the submitted plan set. 
OPERATION AND MAINTENANCE  
A long-term operation and maintenance  plan shall be provided in advance of construction to ensure 
that stormwater management systems function as designed. 
 
EX EX EX EX
vs. vs. vs. vs.
PR PR PR PR
1 1.05 0.85 -0.20 0.25 0.28 0.03 1.30 1.13 -0.17 0.54 0.43 -0.11
2 1.38 1.19 -0.19 0.37 0.40 0.03 1.75 1.59 -0.16 0.80 0.67 -0.13
5 1.94 1.75 -0.19 0.56 0.60 0.04 2.50 2.35 -0.15 1.25 1.11 -0.14
10 2.39 2.21 -0.18 0.73 0.77 0.04 3.12 2.98 -0.14 1.63 1.48 -0.15
25 3.03 2.86 -0.17 0.96 1.00 0.04 3.99 3.85 -0.14 2.15 2.00 -0.15
50 3.49 3.32 -0.17 1.13 1.17 0.04 4.62 4.48 -0.14 2.53 2.39 -0.14
100 4.00 3.83 -0.17 1.32 1.35 0.03 5.32 5.18 -0.14 2.96 2.82 -0.14
Notes:
Post-Development Reduction in Peak Flow Rates
Post-Development Increase in Peak Flow Rates 0.1 cfs or less (Negligible)
TABLE 2: PEAK FLOW COMPARISON APPROVED VS POST-DEVELOPMENT
AREA 300 (NW)
EX PREX PR
AREA 100 (SW) AREA 200 (SE)
EX
STORM
SYSTEM #1
HYDROLOGY STUDIO PEAK FLOW SUMMARY TABLE
PR
COMBINED FLOW
EX PR
SYSTEM #2

Page 69

Page 70

   DIAMOND SPARKLE CAR WASH 
 10 DORSET CROSSING
 SIMSBURY, CONNECTICUT 
 
  
 
 
 
APPENDIX A 
DRAINAGE AREA MAPS 
DA-3-1: FAH DRAINAGE AREA PLAN – PIPE TO PIPE (09-16-2011) 
DA-01: DRAINAGE MAP - APPROVED SITE 
DA-02: DRAINAGE MAP - PROPOSED SITE 
DA-03: DRAINAGE MAP – PROPOSED TREATMENT 

Page 71

Page 72

Page 73

          PROPOSED CAR WASH         
    PREPARED FOR DIAMOND SPARKLE CAR WASH, LLC    
    DRAINAGE MAP - APPROVED SITE    
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
CONTACT INFORMATION
DATE
 6/29/26
                            SIMSBURY, CT10 DORSET CROSSING                  
SHEET
   DA-01   
SCALE: 1"=  60'
 60 0  60 
www.yrc-ne.comWeb:
(860) 367-7264Phone:
H
O
P
M
E
A
D
O
W
 S
T
R
E
E
T
 (C
T
 R
O
U
T
E
 10 &
 202)
DORSET          CROSSING          DRIVE
LEGEND
MAP REFERENCES
0.230WOODS
0.230NO-MOW/BRUSH
0.339LANDSCAPE
0.998IA - ROOF/ROAD/WALK
NRCS SOIL
TC - SHALLOW CONC.
TC - SHEET FLOW
D.A. LIMIT (MEASURED)
CCNITEM
LND = 0.000
IMP = 0.308
A = 0.308 AC
EX-102 ROOF
LND = 0.047
IMP = 0.144
A = 0.191 AC
EX-101
LND = 0.105
IMP = 0.296
A = 0.401 AC
EX-200
LND = 0.044
IMP = 0.133
A = 0.177 AC
EX-300
PR-102 ROOF INF
TO WQ BASIN #3
DORSET CROSSING
EX-100 DISCHARGES TO
SYSTEM #3
TO WQ BASIN #3
THROUGH PAD
EX-300 DISCHARGES
SYSTEM #3
SYSTEM #1
RETAIN-IT TO STREET
THROUGH STS &
EX-200 DISCHARGES
SYSTEM #2
SIMSBURY, CONNECTICUT", DATE: 09-16-2011, SCALE 1" = 60' BY F.A. HESKETH & ASSOCIATES, INC.
"DRAINAGE AREA PLAN - PIPE TO PIPE PREPARED FOR DORSET CROSSING, DORSET CROSSING DRIVE,3.
HESKETH & ASSOCIATES, INC.
DATE: 09-16-2011 AS REVISED THROUGH 10/10/11, SCALE: 1" = 40', SHEET UT-1, PREPARED BY F.A.
"UTILITY PLAN PREPARED FOR DORSET CROSSING, HOPMEADOW STREET, SIMSBURY, CONNECTICUT"2.
09-22-2023, SCALE: 1" = 100', PREPARED BY F.A. HESKETH & ASSOCIATES, INC.
DORSET CROSSING DRIVE, SIMSBURY, CONNECTICUT", DATE: 12-03-2021 AS REVISED THROUGH
"DORSET CROSSING PAD, MASTER DEVELOPMENT PLAN PREPARED FOR DORSET CROSSING, LLC,1.

Page 74

S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
W
S
WG
S
S
GG
EE
SET
CHD
FOUND
MON.'S
234
CL&P
3572
CL&P
235
CL&P
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
C
FLAG POLE
D
GA
TE
CONC. WALK
CONC. WALK
          PROPOSED CAR WASH         
    PREPARED FOR DIAMOND SPARKLE CAR WASH, LLC    
    DRAINAGE MAP - PROPOSED SITE    
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
CONTACT INFORMATION
DATE
 6/29/26
                            SIMSBURY, CT10 DORSET CROSSING                  
SHEET
   DA-02   
SCALE: 1"=  60'
 60 0  60 
www.yrc-ne.comWeb:
(860) 367-7264Phone:
198
200
200
198
200
200
200
202
201
201
201
202
201
HO
P
M
E
A
DO
W
 S
T
R
EET
 (C
T
 R
OU
TE
 10
 &
 202
)
DORSET          CROSSING          DRIVE
LEGEND
MAP REFERENCES
0.230WOODS
0.230NO-MOW/BRUSH
0.339LANDSCAPE
0.998IA - ROOF/ROAD/WALK
NRCS SOIL
TC - SHALLOW CONC.
TC - SHEET FLOW
D.A. LIMIT (MEASURED)
CCNITEM
SOIL MAP & DATA OBTAINED FROM NRCS.5.
ELEVATION DATA OBTAINED FROM MAP REFERENCE 1 AND NOAA DATABASE.4.
ORTHOIMAGERY SPRING 2025 FROM NEARMAP.3.
HESKETH & ASSOCIATES, INC.
DATE: 09-16-2011 AS REVISED THROUGH 10/10/11, SCALE: 1" = 40', SHEET UT-1, PREPARED BY F.A.
"UTILITY PLAN PREPARED FOR DORSET CROSSING, HOPMEADOW STREET, SIMSBURY, CONNECTICUT"2.
09-22-2023, SCALE: 1" = 100', PREPARED BY F.A. HESKETH & ASSOCIATES, INC.
DORSET CROSSING DRIVE, SIMSBURY, CONNECTICUT", DATE: 12-03-2021 AS REVISED THROUGH
"DORSET CROSSING PAD, MASTER DEVELOPMENT PLAN PREPARED FOR DORSET CROSSING, LLC,1.
LND = 0.042
IMP = 0.171
A = 0.213 AC
PR-102 ROOF
LND = 0.047
IMP = 0.231
A = 0.278 AC
PR-101
LND = 0.133
IMP = 0.272
A = 0.405 AC
PR-200
LND = 0.038
IMP = 0.139
A = 0.177 AC
PR-300
PR-102 ROOF INF
TO WQ BASIN #3
DORSET CROSSING
PR-100 DISCHARGES TO
SYSTEM #3
TO WQ BASIN #3
THROUGH PAD
PR-300 DISCHARGES
SYSTEM #3
SYSTEM #1
RETAIN-IT TO STREET
THROUGH STS &
PR-200 DISCHARGES
SYSTEM #2

Page 75

S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
W
S
WG
S
S
GG
EE
SET
CHD
FOUND
MON.'S
234
CL&P
3572
CL&P
235
CL&P
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
C
FLAG POLE
D
GA
TE
CONC. WALK
CONC. WALK
          PROPOSED CAR WASH         
    PREPARED FOR DIAMOND SPARKLE CAR WASH, LLC    
  DRAINAGE MAP - PROPOSED TREATMENT 
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
CONTACT INFORMATION
DATE
 6/29/26
                            SIMSBURY, CT10 DORSET CROSSING                  
SHEET
   DA-03   
SCALE: 1"=  60'
 60 0  60 
www.yrc-ne.comWeb:
(860) 367-7264Phone:
198
200
200
198
200
200
200
202
201
201
201
202
201
HO
P
M
E
A
DO
W
 S
T
R
EET
 (C
T
 R
OU
TE
 10
 &
 202
)
DORSET          CROSSING          DRIVE
LEGEND
MAP REFERENCES
0.230WOODS
0.230NO-MOW/BRUSH
0.339LANDSCAPE
0.998IA - ROOF/ROAD/WALK
NRCS SOIL
TC - SHALLOW CONC.
TC - SHEET FLOW
D.A. LIMIT (MEASURED)
CCNITEM
SOIL MAP & DATA OBTAINED FROM NRCS.5.
ELEVATION DATA OBTAINED FROM MAP REFERENCE 1 AND NOAA DATABASE.4.
ORTHOIMAGERY SPRING 2025 FROM NEARMAP.3.
HESKETH & ASSOCIATES, INC.
DATE: 09-16-2011 AS REVISED THROUGH 10/10/11, SCALE: 1" = 40', SHEET UT-1, PREPARED BY F.A.
"UTILITY PLAN PREPARED FOR DORSET CROSSING, HOPMEADOW STREET, SIMSBURY, CONNECTICUT"2.
09-22-2023, SCALE: 1" = 100', PREPARED BY F.A. HESKETH & ASSOCIATES, INC.
DORSET CROSSING DRIVE, SIMSBURY, CONNECTICUT", DATE: 12-03-2021 AS REVISED THROUGH
"DORSET CROSSING PAD, MASTER DEVELOPMENT PLAN PREPARED FOR DORSET CROSSING, LLC,1.
LND = 0.042
IMP = 0.171
A = 0.213 AC
PR-102 ROOF
TO WQ BASIN #3
DORSET CROSSING
PR-100 DISCHARGES TO
SYSTEM #3
TO WQ BASIN #3
THROUGH PAD
PR-300 DISCHARGES
SYSTEM #3
LND = 0.348
IMP = 0.792
A = 1.140 AC
CONTECH STC 900
PR-200
LND = 0.038
IMP = 0.139
A = 0.177 AC
48" SUMP W/ HOOD
PR-F-301
LND = 0.024
IMP = 0.105
A = 0.129 AC
48" SUMP W/ HOOD
PR-F-102
LND = 0.012
IMP = 0.126
A = 0.138 AC
EX-F-100
BMP'S (WQ BASIN #3)
VIA ORIGINAL INSTALLED
EX-F-100 TREATED
PROPOSED SITE
ADEQUATE FOR
CONTECH STC 900
& INFILTRATED
ALL STORMS RETAINED
PR-102 ROOF INF

Page 76

   DIAMOND SPARKLE CAR WASH 
 10 DORSET CROSSING
 SIMSBURY, CONNECTICUT 
 
  
 
 
 
APPENDIX B 
HYDROLOGIC COMPUTATIONS 
HYDROLOGY STUDIO PEAK FLOW SUMMARY TABLE 
HYDROLOGY STUDIO REPORT 

Page 77

Page 78

10 DORSET CROSSING
SIMSBURY, CT
EX EX EX EX
vs. vs. vs. vs.
PR PR PR PR
1 1.05 0.85 -0.20 0.25 0.28 0.03 1.30 1.13 -0.17 0.54 0.43 -0.11
2 1.38 1.19 -0.19 0.37 0.40 0.03 1.75 1.59 -0.16 0.80 0.67 -0.13
5 1.94 1.75 -0.19 0.56 0.60 0.04 2.50 2.35 -0.15 1.25 1.11 -0.14
10 2.39 2.21 -0.18 0.73 0.77 0.04 3.12 2.98 -0.14 1.63 1.48 -0.15
25 3.03 2.86 -0.17 0.96 1.00 0.04 3.99 3.85 -0.14 2.15 2.00 -0.15
50 3.49 3.32 -0.17 1.13 1.17 0.04 4.62 4.48 -0.14 2.53 2.39 -0.14
100 4.00 3.83 -0.17 1.32 1.35 0.03 5.32 5.18 -0.14 2.96 2.82 -0.14
Notes:
Post-Development Reduction in Peak Flow Rates
Post-Development Increase in Peak Flow Rates 0.1 cfs or less (Negligible)
HYDROLOGY STUDIO PEAK FLOW SUMMARY TABLE
PR
SYSTEM #3
EX PR
SYSTEM #2
TABLE 1: PEAK FLOW COMPARISON PRE- & POST-DEVELOPMENT
AREA 300 (NW)
EX PREX PR
AREA 100 (SW) AREA 200 (SE)
EX
STORM
SYSTEM #3

Page 79

Page 80

Table of Contents
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
Basin Model Schematic 1......................................................................................................................................
Hydrograph by Return Period 2............................................................................................................................
1 - Year
Hydrograph Summary 3..................................................................................................................................
Hydrograph Reports
Hydrograph No. 1, NRCS Runoff, EX-101 4..............................................................................................
Hydrograph No. 2, NRCS Runoff, EX-102 ROOF 5.....................................................................................
Hydrograph No. 3, Junction, EX-100 6.....................................................................................................
Hydrograph No. 4, NRCS Runoff, EX-200 (SYSTEM #1) 7...........................................................................
Hydrograph No. 5, NRCS Runoff, EX-300 8..............................................................................................
Hydrograph No. 6, Junction, EX-SYSTEM #3 9..........................................................................................
Hydrograph No. 7, NRCS Runoff, PR-101 10............................................................................................
Hydrograph No. 8, NRCS Runoff, PR-102 ROOF 11...................................................................................
Hydrograph No. 9, Junction, PR-100 12...................................................................................................
Hydrograph No. 10, Pond Route, PR-102 ROOF INF 13..............................................................................
Detention Pond Reports - F-ROOF INF-100 14..............................................................................
Hydrograph No. 11, NRCS Runoff, PR-200 (SYSTEM #1) 18........................................................................
Hydrograph No. 12, NRCS Runoff, PR-300 19...........................................................................................
Hydrograph No. 13, Junction, PR-SYSTEM #3 20......................................................................................
Hydrograph No. 14, Rational, PR-200 STC 900 21.....................................................................................
Design Storm Report - NOAA-D, 24-hr 22.....................................................................................
2 - Year
Hydrograph Summary 23................................................................................................................................
Hydrograph Reports
Hydrograph No. 1, NRCS Runoff, EX-101 24.............................................................................................
Hydrograph No. 2, NRCS Runoff, EX-102 ROOF 25...................................................................................
Hydrograph No. 3, Junction, EX-100 26...................................................................................................
Hydrograph No. 4, NRCS Runoff, EX-200 (SYSTEM #1) 27.........................................................................
Hydrograph No. 5, NRCS Runoff, EX-300 28.............................................................................................
Hydrograph No. 6, Junction, EX-SYSTEM #3 29........................................................................................
Hydrograph No. 7, NRCS Runoff, PR-101 30............................................................................................
Hydrograph No. 8, NRCS Runoff, PR-102 ROOF 31...................................................................................
Hydrograph No. 9, Junction, PR-100 32...................................................................................................
Hydrograph No. 10, Pond Route, PR-102 ROOF INF 33..............................................................................
Hydrograph No. 11, NRCS Runoff, PR-200 (SYSTEM #1) 34........................................................................
Hydrograph No. 12, NRCS Runoff, PR-300 35...........................................................................................

Page 81

Contents continued...
Hydrograph No. 13, Junction, PR-SYSTEM #3 36......................................................................................
Hydrograph No. 14, Rational, PR-200 STC 900 37.....................................................................................
Design Storm Report - NOAA-D, 24-hr 38.....................................................................................
5 - Year
Hydrograph Summary 39................................................................................................................................
Hydrograph Reports
Hydrograph No. 1, NRCS Runoff, EX-101 40.............................................................................................
Hydrograph No. 2, NRCS Runoff, EX-102 ROOF 41...................................................................................
Hydrograph No. 3, Junction, EX-100 42...................................................................................................
Hydrograph No. 4, NRCS Runoff, EX-200 (SYSTEM #1) 43.........................................................................
Hydrograph No. 5, NRCS Runoff, EX-300 44.............................................................................................
Hydrograph No. 6, Junction, EX-SYSTEM #3 45........................................................................................
Hydrograph No. 7, NRCS Runoff, PR-101 46............................................................................................
Hydrograph No. 8, NRCS Runoff, PR-102 ROOF 47...................................................................................
Hydrograph No. 9, Junction, PR-100 48...................................................................................................
Hydrograph No. 10, Pond Route, PR-102 ROOF INF 49..............................................................................
Hydrograph No. 11, NRCS Runoff, PR-200 (SYSTEM #1) 50........................................................................
Hydrograph No. 12, NRCS Runoff, PR-300 51...........................................................................................
Hydrograph No. 13, Junction, PR-SYSTEM #3 52......................................................................................
Hydrograph No. 14, Rational, PR-200 STC 900 53.....................................................................................
Design Storm Report - NOAA-D, 24-hr 54.....................................................................................
10 - Year
Hydrograph Summary 55................................................................................................................................
Hydrograph Reports
Hydrograph No. 1, NRCS Runoff, EX-101 56.............................................................................................
Hydrograph No. 2, NRCS Runoff, EX-102 ROOF 57...................................................................................
Hydrograph No. 3, Junction, EX-100 58...................................................................................................
Hydrograph No. 4, NRCS Runoff, EX-200 (SYSTEM #1) 59.........................................................................
Hydrograph No. 5, NRCS Runoff, EX-300 60.............................................................................................
Hydrograph No. 6, Junction, EX-SYSTEM #3 61........................................................................................
Hydrograph No. 7, NRCS Runoff, PR-101 62............................................................................................
Hydrograph No. 8, NRCS Runoff, PR-102 ROOF 63...................................................................................
Hydrograph No. 9, Junction, PR-100 64...................................................................................................
Hydrograph No. 10, Pond Route, PR-102 ROOF INF 65..............................................................................
Hydrograph No. 11, NRCS Runoff, PR-200 (SYSTEM #1) 66........................................................................
Hydrograph No. 12, NRCS Runoff, PR-300 67...........................................................................................

Page 82

Contents continued...
Hydrograph No. 13, Junction, PR-SYSTEM #3 68......................................................................................
Hydrograph No. 14, Rational, PR-200 STC 900 69.....................................................................................
Design Storm Report - NOAA-D, 24-hr 70.....................................................................................
25 - Year
Hydrograph Summary 71................................................................................................................................
Hydrograph Reports
Hydrograph No. 1, NRCS Runoff, EX-101 72.............................................................................................
Hydrograph No. 2, NRCS Runoff, EX-102 ROOF 73...................................................................................
Hydrograph No. 3, Junction, EX-100 74...................................................................................................
Hydrograph No. 4, NRCS Runoff, EX-200 (SYSTEM #1) 75.........................................................................
Hydrograph No. 5, NRCS Runoff, EX-300 76.............................................................................................
Hydrograph No. 6, Junction, EX-SYSTEM #3 77........................................................................................
Hydrograph No. 7, NRCS Runoff, PR-101 78............................................................................................
Hydrograph No. 8, NRCS Runoff, PR-102 ROOF 79...................................................................................
Hydrograph No. 9, Junction, PR-100 80...................................................................................................
Hydrograph No. 10, Pond Route, PR-102 ROOF INF 81..............................................................................
Hydrograph No. 11, NRCS Runoff, PR-200 (SYSTEM #1) 82........................................................................
Hydrograph No. 12, NRCS Runoff, PR-300 83...........................................................................................
Hydrograph No. 13, Junction, PR-SYSTEM #3 84......................................................................................
Hydrograph No. 14, Rational, PR-200 STC 900 85.....................................................................................
Design Storm Report - NOAA-D, 24-hr 86.....................................................................................
50 - Year
Hydrograph Summary 87................................................................................................................................
Hydrograph Reports
Hydrograph No. 1, NRCS Runoff, EX-101 88.............................................................................................
Hydrograph No. 2, NRCS Runoff, EX-102 ROOF 89...................................................................................
Hydrograph No. 3, Junction, EX-100 90...................................................................................................
Hydrograph No. 4, NRCS Runoff, EX-200 (SYSTEM #1) 91.........................................................................
Hydrograph No. 5, NRCS Runoff, EX-300 92.............................................................................................
Hydrograph No. 6, Junction, EX-SYSTEM #3 93........................................................................................
Hydrograph No. 7, NRCS Runoff, PR-101 94............................................................................................
Hydrograph No. 8, NRCS Runoff, PR-102 ROOF 95...................................................................................
Hydrograph No. 9, Junction, PR-100 96...................................................................................................
Hydrograph No. 10, Pond Route, PR-102 ROOF INF 97..............................................................................
Hydrograph No. 11, NRCS Runoff, PR-200 (SYSTEM #1) 98........................................................................
Hydrograph No. 12, NRCS Runoff, PR-300 99...........................................................................................

Page 83

Contents continued...
Hydrograph No. 13, Junction, PR-SYSTEM #3 100....................................................................................
Hydrograph No. 14, Rational, PR-200 STC 900 101...................................................................................
Design Storm Report - NOAA-D, 24-hr 102...................................................................................
100 - Year
Hydrograph Summary 103..............................................................................................................................
Hydrograph Reports
Hydrograph No. 1, NRCS Runoff, EX-101 104...........................................................................................
Hydrograph No. 2, NRCS Runoff, EX-102 ROOF 105.................................................................................
Hydrograph No. 3, Junction, EX-100 106..................................................................................................
Hydrograph No. 4, NRCS Runoff, EX-200 (SYSTEM #1) 107........................................................................
Hydrograph No. 5, NRCS Runoff, EX-300 108...........................................................................................
Hydrograph No. 6, Junction, EX-SYSTEM #3 109......................................................................................
Hydrograph No. 7, NRCS Runoff, PR-101 110...........................................................................................
Hydrograph No. 8, NRCS Runoff, PR-102 ROOF 111..................................................................................
Hydrograph No. 9, Junction, PR-100 112..................................................................................................
Hydrograph No. 10, Pond Route, PR-102 ROOF INF 113............................................................................
Hydrograph No. 11, NRCS Runoff, PR-200 (SYSTEM #1) 114......................................................................
Hydrograph No. 12, NRCS Runoff, PR-300 115.........................................................................................
Hydrograph No. 13, Junction, PR-SYSTEM #3 116.....................................................................................
Hydrograph No. 14, Rational, PR-200 STC 900 117....................................................................................
Design Storm Report - NOAA-D, 24-hr 118...................................................................................
IDF Report 119.......................................................................................................................................................
Precipitation Report 120........................................................................................................................................

Page 84

Basin Model
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
1

Page 85

Hydrograph by Return Period
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
Hyd.
No.
Hydrograph
Type
Hydrograph
Name
Peak Outflow (cfs)
1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr
1 NRCS Runoff EX-101 0.272 0.397 0.611 0.792 1.042 1.223 1.425
2 NRCS Runoff EX-102 ROOF 0.781 0.987 1.323 1.601 1.984 2.261 2.571
3 Junction EX-100 1.053 1.384 1.935 2.392 3.027 3.485 3.997
4 NRCS Runoff EX-200 (SYSTEM #1) 0.542 0.802 1.248 1.625 2.151 2.531 2.956
5 NRCS Runoff EX-300 0.250 0.366 0.564 0.731 0.963 1.131 1.318
6 Junction EX-SYSTEM #3 1.303 1.750 2.499 3.123 3.990 4.615 5.315
7 NRCS Runoff PR-101 0.498 0.690 1.008 1.272 1.634 1.894 2.185
8 NRCS Runoff PR-102 ROOF 0.353 0.498 0.740 0.942 1.221 1.422 1.645
9 Junction PR-100 0.851 1.188 1.749 2.214 2.855 3.316 3.830
10 Pond Route PR-102 ROOF INF 0.000 0.000 0.000 0.000 0.000 0.000 0.106
11 NRCS Runoff PR-200 (SYSTEM #1) 0.432 0.674 1.105 1.477 2.003 2.386 2.816
12 NRCS Runoff PR-300 0.278 0.397 0.598 0.766 0.998 1.165 1.351
13 Junction PR-SYSTEM #3 1.129 1.585 2.347 2.979 3.853 4.481 5.181
14 Rational PR-200 STC 900 3.431 4.096 5.204 6.107 8.108 9.948 11.59
2

Page 86

Hydrograph 1-yr Summary
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
Hyd.
No.
Hydrograph
Type
Hydrograph
Name
Peak
Flow
(cfs)
Time to
Peak
(hrs)
Hydrograph
Volume
(cuft)
Inflow
Hyd(s)
Maximum
Elevation
(ft)
Maximum
Storage
(cuft)
1 NRCS Runoff EX-101 0.272 12.12 842 ----
2 NRCS Runoff EX-102 ROOF 0.781 12.12 2,756 ----
3 Junction EX-100 1.053 12.12 3,597 1, 2
4 NRCS Runoff EX-200 (SYSTEM #1) 0.542 12.12 1,681 ----
5 NRCS Runoff EX-300 0.250 12.12 774 ----
6 Junction EX-SYSTEM #3 1.303 12.12 4,371 3, 5
7 NRCS Runoff PR-101 0.498 12.12 1,547 ----
8 NRCS Runoff PR-102 ROOF 0.353 12.12 1,091 ----
9 Junction PR-100 0.851 12.12 2,638 7, 8
10 Pond Route PR-102 ROOF INF 0.000 18.38 0.000 8 193.57 277
11 NRCS Runoff PR-200 (SYSTEM #1) 0.432 12.12 1,363 ----
12 NRCS Runoff PR-300 0.278 12.12 859 ----
13 Junction PR-SYSTEM #3 1.129 12.12 3,497 9, 12
14 Rational PR-200 STC 900 3.431 0.08 1,544 ----
3

Page 87

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-101 Hyd. No. 1
Hydrograph Type = NRCS Runoff Peak Flow = 0.272 cfs
Storm Frequency = 1-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 842 cuft
Drainage Area = 0.191 ac Curve Number = 83.48*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 2.62 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.144 98.00 Impervious
0.047 39.00 Landscape
0.191 83.48 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.02
0.04
0.06
0.08
0.1
0.12
0.14
0.16
0.18
0.2
0.22
0.24
0.26
0.28
Qp = 0.272 cfs
4

Page 88

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-102 ROOF Hyd. No. 2
Hydrograph Type = NRCS Runoff Peak Flow = 0.781 cfs
Storm Frequency = 1-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 2,756 cuft
Drainage Area = 0.308 ac Curve Number = 98.00*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 2.62 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.308 98.00 Impervious
0.308 98.00 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
0.55
0.6
0.65
0.7
0.75
0.8
0.85
0.9
0.95
1
Qp = 0.781 cfs
5

Page 89

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-100 Hyd. No. 3
Hydrograph Type = Junction Peak Flow = 1.053 cfs
Storm Frequency = 1-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 3,597 cuft
Inflow Hydrographs = 1, 2 Total Contrib. Area = 0.499 ac
EX-101 EX-102 ROOF EX-100
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.053 cfs
6

Page 90

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-200 (SYSTEM #1) Hyd. No. 4
Hydrograph Type = NRCS Runoff Peak Flow = 0.542 cfs
Storm Frequency = 1-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 1,681 cuft
Drainage Area = 0.401 ac Curve Number = 82.55*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 2.62 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.296 98.00 Impervious
0.105 39.00 Landscape
0.401 82.55 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
0.55
0.6
0.65
0.7
0.75
0.8
0.85
0.9
0.95
1
Qp = 0.542 cfs
7

Page 91

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-300 Hyd. No. 5
Hydrograph Type = NRCS Runoff Peak Flow = 0.250 cfs
Storm Frequency = 1-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 774 cuft
Drainage Area = 0.177 ac Curve Number = 83.33*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 2.62 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.133 98.00 Impervious
0.044 39.00 Landscape
0.177 83.33 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.02
0.04
0.06
0.08
0.1
0.12
0.14
0.16
0.18
0.2
0.22
0.24
0.26
Qp = 0.250 cfs
8

Page 92

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-SYSTEM #3 Hyd. No. 6
Hydrograph Type = Junction Peak Flow = 1.303 cfs
Storm Frequency = 1-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 4,371 cuft
Inflow Hydrographs = 5 Total Contrib. Area = 0.177 ac
EX-100 EX-300 EX-SYSTEM #3
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.303 cfs
9

Page 93

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-101 Hyd. No. 7
Hydrograph Type = NRCS Runoff Peak Flow = 0.498 cfs
Storm Frequency = 1-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 1,547 cuft
Drainage Area = 0.278 ac Curve Number = 88.03*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 2.62 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.231 98.00 Impervious
0.047 39.00 Landscape
0.278 88.03 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.04
0.08
0.12
0.16
0.2
0.24
0.28
0.32
0.36
0.4
0.44
0.48
Qp = 0.498 cfs
10

Page 94

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-102 ROOF Hyd. No. 8
Hydrograph Type = NRCS Runoff Peak Flow = 0.353 cfs
Storm Frequency = 1-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 1,091 cuft
Drainage Area = 0.213 ac Curve Number = 86.37*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 2.62 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.171 98.00 Impervious
0.042 39.00 Landscape
0.213 86.37 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.02
0.04
0.06
0.08
0.1
0.12
0.14
0.16
0.18
0.2
0.22
0.24
0.26
0.28
0.3
0.32
0.34
0.36
Qp = 0.353 cfs
11

Page 95

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-100 Hyd. No. 9
Hydrograph Type = Junction Peak Flow = 0.851 cfs
Storm Frequency = 1-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 2,638 cuft
Inflow Hydrographs = 7, 8 Total Contrib. Area = 0.491 ac
PR-101 PR-102 ROOF PR-100
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
0.55
0.6
0.65
0.7
0.75
0.8
0.85
0.9
0.95
1
Qp = 0.851 cfs
12

Page 96

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-102 ROOF INF Hyd. No. 10
Hydrograph Type = Pond Route Peak Flow = 0.000 cfs
Storm Frequency = 1-yr Time to Peak = 18.38 hrs
Time Interval = 1 min Hydrograph Volume = 0.000 cuft
Inflow Hydrograph = 8 - PR-102 ROOF Max. Elevation = 193.57 ft
Pond Name = F-ROOF INF-100 Max. Storage = 277 cuft
Pond Routing by Storage Indication Method
PR-102 ROOF PR-102 ROOF INF
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
0
0.02
0.04
0.06
0.08
0.1
0.12
0.14
0.16
0.18
0.2
0.22
0.24
0.26
0.28
0.3
0.32
0.34
0.36
Qp = 0.000 cfs
13

Page 97

Pond Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
F-ROOF INF-100 Stage-Storage
Description Input
Stage / Storage Table
Stage
(in)
Elevation
(ft)
Contour Area
(sqft)
Incr. Storage
(cuft)
Total Storage
(cuft)
StormTech® MC-3500™ Chamber
Chamber Height, in
Chamber Shape
Chamber Width, in
Installed Length, ft
No. Chambers
Bare Chamber Stor, cuft
No. Rows
Space Between Rows, in
Stone Above, in
Stone Below, in
Stone Sides, in
Stone Ends, in
Encasement Voids, %
Encasement Bottom Elevation, ft
45
Arch
77
7.17
16
1,758
2
9
12
9
12
12
40.00
192.90
0.0 192.90 994 0.000 0.000
3.3 193.18 994 109 109
6.6 193.45 994 109 219
9.9 193.73 994 136 354
13.2 194.00 994 211 565
16.5 194.28 994 210 775
19.8 194.55 994 209 984
23.1 194.83 994 207 1,192
26.4 195.10 994 205 1,396
29.7 195.38 994 202 1,598
33.0 195.65 994 198 1,796
36.3 195.93 994 193 1,989
39.6 196.20 994 187 2,176
42.9 196.48 994 180 2,356
46.2 196.75 994 172 2,528
49.5 197.03 994 161 2,688
52.8 197.30 994 144 2,833
56.1 197.58 994 118 2,951
59.4 197.85 994 109 3,060
62.7 198.13 994 109 3,170
66.0 198.40 994 109 3,279
1-yr  2-yr  5-yr  10-yr  25-yr  50-yr  100-yr  UG Chambers Top of Pond
Top of Chamber Invert of Chamber Top Stone Bottom Stone
Total Storage (cuft)
0 500 1000 1500 2000 2500 3000
192
193
194
195
196
197
198
199
0
1
2
3
4
5
6
Stage-Storage
14

Page 98

Pond Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
F-ROOF INF-100 Stage-Discharge
Culvert / Orifices
Rise, in
Span, in
No. Barrels
Invert Elevation, ft
Orifice Coefficient, Co
Length, ft
Barrel Slope, %
N-Value, n
Cir Culvert
Orifice
123
12
12
1
196.55
0.60
26
.6
0.013
Perforated Riser
Hole Diameter, in
No. holes
Invert Elevation, ft
Height, ft
Orifice Coefficient, Co
Weirs
Shape / Type
Crest Elevation, ft
Crest Length, ft
Angle, deg
Weir Coefficient, Cw
Riser
Weir
123
Ancillary
Exfiltration, in/hr 2.41**
**Exfiltration extracted from outflow hydrograph. Rate applied to contours.
Top of Pond 1-yr  2-yr  5-yr  10-yr  25-yr  50-yr  100-yr  Pond Outflow
Discharge (cfs)
0 1 2 3 4 5
193
194
195
196
197
198
0
1
2
3
4
5
Stage-Discharge
15

Page 99

Pond Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
F-ROOF INF-100 Stage-Storage-Discharge Summary
Stage
(ft)
Elev.
(ft)
Storage
(cuft)
Culvert
(cfs)
Orifices, cfs
123
Riser
(cfs)
Weirs, cfs
123
Pf Riser
(cfs)
Exfil
(cfs)
User
(cfs)
Total
(cfs)
0.00 192.90 0.000 0.000 0.000 0.000
0.28 193.18 109 0.000 0.056 0.056
0.55 193.45 219 0.000 0.057 0.057
0.83 193.73 354 0.000 0.058 0.058
1.10 194.00 565 0.000 0.059 0.059
1.38 194.28 775 0.000 0.060 0.060
1.65 194.55 984 0.000 0.061 0.061
1.93 194.83 1,192 0.000 0.062 0.062
2.20 195.10 1,396 0.000 0.063 0.063
2.48 195.38 1,598 0.000 0.064 0.064
2.75 195.65 1,796 0.000 0.065 0.065
3.03 195.93 1,989 0.000 0.066 0.066
3.30 196.20 2,176 0.000 0.067 0.067
3.58 196.48 2,356 0.000 0.068 0.068
3.85 196.75 2,528 0.171 ic 0.069 0.240
4.13 197.03 2,688 0.763 oc 0.070 0.834
4.40 197.30 2,833 1.374 oc 0.071 1.445
4.68 197.58 2,951 1.766 oc 0.072 1.838
4.95 197.85 3,060 2.803 oc 0.073 2.876
5.23 198.13 3,170 3.549 oc 0.074 3.623
5.50 198.40 3,279 4.163 oc 0.075 4.238
Suffix key: ic = inlet control, oc = outlet control, s = submerged weir 16

Page 100

Pond Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
F-ROOF INF-100 Pond Drawdown
Stage (ft)
17

Page 101

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-200 (SYSTEM #1) Hyd. No. 11
Hydrograph Type = NRCS Runoff Peak Flow = 0.432 cfs
Storm Frequency = 1-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 1,363 cuft
Drainage Area = 0.405 ac Curve Number = 78.62*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 2.62 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.272 98.00 Impervious
0.133 39.00 Landscape
0.405 78.62 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.02
0.04
0.06
0.08
0.1
0.12
0.14
0.16
0.18
0.2
0.22
0.24
0.26
0.28
0.3
0.32
0.34
0.36
0.38
0.4
0.42
0.44
Qp = 0.432 cfs
18

Page 102

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-300 Hyd. No. 12
Hydrograph Type = NRCS Runoff Peak Flow = 0.278 cfs
Storm Frequency = 1-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 859 cuft
Drainage Area = 0.177 ac Curve Number = 85.33*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 2.62 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.139 98.00 Impervious
0.038 39.00 Landscape
0.177 85.33 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.02
0.04
0.06
0.08
0.1
0.12
0.14
0.16
0.18
0.2
0.22
0.24
0.26
0.28
Qp = 0.278 cfs
19

Page 103

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-SYSTEM #3 Hyd. No. 13
Hydrograph Type = Junction Peak Flow = 1.129 cfs
Storm Frequency = 1-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 3,497 cuft
Inflow Hydrographs = 12 Total Contrib. Area = 0.177 ac
PR-100 PR-300 PR-SYSTEM #3
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.129 cfs
20

Page 104

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-200 STC 900 Hyd. No. 14
Hydrograph Type = Rational Peak Flow = 3.431 cfs
Storm Frequency = 1-yr Time to Peak = 0.08 hrs
Time Interval = 1 min Runoff Volume = 1,544 cuft
Drainage Area = 1.14 ac Runoff Coeff. = 0.72*
Tc Method = User Time of Conc. (Tc) = 5.0 min
IDF Curve = 20260625DORSET LOT F NOAA IDF.idf Intensity = 4.18 in/hr
Freq. Corr. Factor = 1.00 Asc/Rec Limb Factors = 1/2
* Composite C Worksheet
AREA (ac) C DESCRIPTION
0.792 0.90 Impervious
0.348 0.30 Landscape
1.14 0.72
Time (min)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
0
1
2
3
4
Qp = 3.431 cfs
21

Page 105

Design Storm Report
Custom Storm filename: 
Hydrology Studio v 3.0.0.44 06-29-2026
Storm Distribution: NOAA-D, 24-hr
Total Rainfall Volume (in)Storm
Duration ✔ 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr
24 hrs 2.62 3.29 0.00 4.39 5.30 6.56 7.47 8.49
Incremental Rainfall Distribution, 1-yr
Time Time Time Time TimePrecip Precip Precip Precip Precip
(hrs) (hrs) (hrs) (hrs) (hrs)(in) (in) (in) (in) (in)
11.60 0.007903
11.62 0.008319
11.63 0.008318
11.65 0.008319
11.67 0.008318
11.68 0.008319
11.70 0.008318
11.72 0.011410
11.73 0.011410
11.75 0.011410
11.77 0.011410
11.78 0.011410
11.80 0.011411
11.82 0.015833
11.83 0.015834
11.85 0.015833
11.87 0.015833
11.88 0.015834
11.90 0.015833
11.92 0.027314
11.93 0.027313
11.95 0.027314
11.97 0.027313
11.98 0.027314
12.00 0.027312
12.02 0.045574
12.03 0.045576
12.05 0.045574
12.07 0.045576
12.08 0.045574
12.10 0.045576
12.12 0.015833
12.13 0.015834
12.15 0.015833
12.17 0.015833
12.18 0.015834
12.20 0.015833
12.22 0.011410
12.23 0.011410
12.25 0.011410
12.27 0.011410
12.28 0.011410
12.30 0.011410
12.32 0.008318
12.33 0.008319
12.35 0.008318
12.37 0.008319
12.38 0.008318
12.40 0.008319
12.42 0.007903
12.43 0.007904
12.45 0.007903
12.47 0.007903
12.48 0.007904
12.50 0.007903
Time (hrs)
0 2 4 6 8 10 12 14 16 18 20 22 24
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
1.8
2
2.2
2.4
2.6
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
1.8
2
2.2
2.4
2.6
22

Page 106

Hydrograph 2-yr Summary
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
Hyd.
No.
Hydrograph
Type
Hydrograph
Name
Peak
Flow
(cfs)
Time to
Peak
(hrs)
Hydrograph
Volume
(cuft)
Inflow
Hyd(s)
Maximum
Elevation
(ft)
Maximum
Storage
(cuft)
1 NRCS Runoff EX-101 0.397 12.12 1,229 ----
2 NRCS Runoff EX-102 ROOF 0.987 12.12 3,525 ----
3 Junction EX-100 1.384 12.12 4,754 1, 2
4 NRCS Runoff EX-200 (SYSTEM #1) 0.802 12.12 2,478 ----
5 NRCS Runoff EX-300 0.366 12.12 1,132 ----
6 Junction EX-SYSTEM #3 1.750 12.12 5,885 3, 5
7 NRCS Runoff PR-101 0.690 12.12 2,165 ----
8 NRCS Runoff PR-102 ROOF 0.498 12.12 1,550 ----
9 Junction PR-100 1.188 12.12 3,715 7, 8
10 Pond Route PR-102 ROOF INF 0.000 17.57 0.000 8 193.89 484
11 NRCS Runoff PR-200 (SYSTEM #1) 0.674 12.12 2,092 ----
12 NRCS Runoff PR-300 0.397 12.12 1,233 ----
13 Junction PR-SYSTEM #3 1.585 12.12 4,948 9, 12
14 Rational PR-200 STC 900 4.096 0.08 1,843 ----
23

Page 107

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-101 Hyd. No. 1
Hydrograph Type = NRCS Runoff Peak Flow = 0.397 cfs
Storm Frequency = 2-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 1,229 cuft
Drainage Area = 0.191 ac Curve Number = 83.48*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 3.29 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.144 98.00 Impervious
0.047 39.00 Landscape
0.191 83.48 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.02
0.04
0.06
0.08
0.1
0.12
0.14
0.16
0.18
0.2
0.22
0.24
0.26
0.28
0.3
0.32
0.34
0.36
0.38
0.4
Qp = 0.397 cfs
24

Page 108

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-102 ROOF Hyd. No. 2
Hydrograph Type = NRCS Runoff Peak Flow = 0.987 cfs
Storm Frequency = 2-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 3,525 cuft
Drainage Area = 0.308 ac Curve Number = 98.00*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 3.29 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.308 98.00 Impervious
0.308 98.00 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
0.55
0.6
0.65
0.7
0.75
0.8
0.85
0.9
0.95
1
Qp = 0.987 cfs
25

Page 109

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-100 Hyd. No. 3
Hydrograph Type = Junction Peak Flow = 1.384 cfs
Storm Frequency = 2-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 4,754 cuft
Inflow Hydrographs = 1, 2 Total Contrib. Area = 0.499 ac
EX-101 EX-102 ROOF EX-100
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.384 cfs
26

Page 110

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-200 (SYSTEM #1) Hyd. No. 4
Hydrograph Type = NRCS Runoff Peak Flow = 0.802 cfs
Storm Frequency = 2-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 2,478 cuft
Drainage Area = 0.401 ac Curve Number = 82.55*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 3.29 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.296 98.00 Impervious
0.105 39.00 Landscape
0.401 82.55 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
0.55
0.6
0.65
0.7
0.75
0.8
0.85
0.9
0.95
1
Qp = 0.802 cfs
27

Page 111

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-300 Hyd. No. 5
Hydrograph Type = NRCS Runoff Peak Flow = 0.366 cfs
Storm Frequency = 2-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 1,132 cuft
Drainage Area = 0.177 ac Curve Number = 83.33*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 3.29 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.133 98.00 Impervious
0.044 39.00 Landscape
0.177 83.33 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.02
0.04
0.06
0.08
0.1
0.12
0.14
0.16
0.18
0.2
0.22
0.24
0.26
0.28
0.3
0.32
0.34
0.36
Qp = 0.366 cfs
28

Page 112

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-SYSTEM #3 Hyd. No. 6
Hydrograph Type = Junction Peak Flow = 1.750 cfs
Storm Frequency = 2-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 5,885 cuft
Inflow Hydrographs = 5 Total Contrib. Area = 0.177 ac
EX-100 EX-300 EX-SYSTEM #3
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.750 cfs
29

Page 113

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-101 Hyd. No. 7
Hydrograph Type = NRCS Runoff Peak Flow = 0.690 cfs
Storm Frequency = 2-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 2,165 cuft
Drainage Area = 0.278 ac Curve Number = 88.03*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 3.29 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.231 98.00 Impervious
0.047 39.00 Landscape
0.278 88.03 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
0.55
0.6
0.65
0.7
0.75
0.8
0.85
0.9
0.95
1
Qp = 0.690 cfs
30

Page 114

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-102 ROOF Hyd. No. 8
Hydrograph Type = NRCS Runoff Peak Flow = 0.498 cfs
Storm Frequency = 2-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 1,550 cuft
Drainage Area = 0.213 ac Curve Number = 86.37*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 3.29 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.171 98.00 Impervious
0.042 39.00 Landscape
0.213 86.37 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.04
0.08
0.12
0.16
0.2
0.24
0.28
0.32
0.36
0.4
0.44
0.48
Qp = 0.498 cfs
31

Page 115

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-100 Hyd. No. 9
Hydrograph Type = Junction Peak Flow = 1.188 cfs
Storm Frequency = 2-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 3,715 cuft
Inflow Hydrographs = 7, 8 Total Contrib. Area = 0.491 ac
PR-101 PR-102 ROOF PR-100
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.188 cfs
32

Page 116

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-102 ROOF INF Hyd. No. 10
Hydrograph Type = Pond Route Peak Flow = 0.000 cfs
Storm Frequency = 2-yr Time to Peak = 17.57 hrs
Time Interval = 1 min Hydrograph Volume = 0.000 cuft
Inflow Hydrograph = 8 - PR-102 ROOF Max. Elevation = 193.89 ft
Pond Name = F-ROOF INF-100 Max. Storage = 484 cuft
Pond Routing by Storage Indication Method
PR-102 ROOF PR-102 ROOF INF
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
0
0.02
0.04
0.06
0.08
0.1
0.12
0.14
0.16
0.18
0.2
0.22
0.24
0.26
0.28
0.3
0.32
0.34
0.36
0.38
0.4
0.42
0.44
0.46
0.48
0.5
Qp = 0.000 cfs
33

Page 117

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-200 (SYSTEM #1) Hyd. No. 11
Hydrograph Type = NRCS Runoff Peak Flow = 0.674 cfs
Storm Frequency = 2-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 2,092 cuft
Drainage Area = 0.405 ac Curve Number = 78.62*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 3.29 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.272 98.00 Impervious
0.133 39.00 Landscape
0.405 78.62 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
0.55
0.6
0.65
0.7
0.75
0.8
0.85
0.9
0.95
1
Qp = 0.674 cfs
34

Page 118

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-300 Hyd. No. 12
Hydrograph Type = NRCS Runoff Peak Flow = 0.397 cfs
Storm Frequency = 2-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 1,233 cuft
Drainage Area = 0.177 ac Curve Number = 85.33*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 3.29 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.139 98.00 Impervious
0.038 39.00 Landscape
0.177 85.33 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.02
0.04
0.06
0.08
0.1
0.12
0.14
0.16
0.18
0.2
0.22
0.24
0.26
0.28
0.3
0.32
0.34
0.36
0.38
0.4
Qp = 0.397 cfs
35

Page 119

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-SYSTEM #3 Hyd. No. 13
Hydrograph Type = Junction Peak Flow = 1.585 cfs
Storm Frequency = 2-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 4,948 cuft
Inflow Hydrographs = 12 Total Contrib. Area = 0.177 ac
PR-100 PR-300 PR-SYSTEM #3
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.585 cfs
36

Page 120

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-200 STC 900 Hyd. No. 14
Hydrograph Type = Rational Peak Flow = 4.096 cfs
Storm Frequency = 2-yr Time to Peak = 0.08 hrs
Time Interval = 1 min Runoff Volume = 1,843 cuft
Drainage Area = 1.14 ac Runoff Coeff. = 0.72*
Tc Method = User Time of Conc. (Tc) = 5.0 min
IDF Curve = 20260625DORSET LOT F NOAA IDF.idf Intensity = 4.99 in/hr
Freq. Corr. Factor = 1.00 Asc/Rec Limb Factors = 1/2
* Composite C Worksheet
AREA (ac) C DESCRIPTION
0.792 0.90 Impervious
0.348 0.30 Landscape
1.14 0.72
Time (min)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
0
1
2
3
4
5
Qp = 4.096 cfs
37

Page 121

Design Storm Report
Custom Storm filename: 
Hydrology Studio v 3.0.0.44 06-29-2026
Storm Distribution: NOAA-D, 24-hr
Total Rainfall Volume (in)Storm
Duration 1-yr ✔ 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr
24 hrs 2.62 3.29 0.00 4.39 5.30 6.56 7.47 8.49
Incremental Rainfall Distribution, 2-yr
Time Time Time Time TimePrecip Precip Precip Precip Precip
(hrs) (hrs) (hrs) (hrs) (hrs)(in) (in) (in) (in) (in)
11.60 0.009925
11.62 0.010446
11.63 0.010446
11.65 0.010446
11.67 0.010445
11.68 0.010446
11.70 0.010445
11.72 0.014328
11.73 0.014328
11.75 0.014328
11.77 0.014328
11.78 0.014328
11.80 0.014329
11.82 0.019882
11.83 0.019883
11.85 0.019882
11.87 0.019882
11.88 0.019883
11.90 0.019882
11.92 0.034299
11.93 0.034297
11.95 0.034299
11.97 0.034297
11.98 0.034299
12.00 0.034297
12.02 0.057228
12.03 0.057231
12.05 0.057228
12.07 0.057231
12.08 0.057228
12.10 0.057231
12.12 0.019882
12.13 0.019883
12.15 0.019882
12.17 0.019882
12.18 0.019883
12.20 0.019882
12.22 0.014328
12.23 0.014328
12.25 0.014328
12.27 0.014328
12.28 0.014328
12.30 0.014327
12.32 0.010445
12.33 0.010446
12.35 0.010445
12.37 0.010446
12.38 0.010445
12.40 0.010447
12.42 0.009924
12.43 0.009925
12.45 0.009925
12.47 0.009925
12.48 0.009925
12.50 0.009925
Time (hrs)
0 2 4 6 8 10 12 14 16 18 20 22 24
0
1
2
3
4
0
1
2
3
4
38

Page 122

Hydrograph 5-yr Summary
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
Hyd.
No.
Hydrograph
Type
Hydrograph
Name
Peak
Flow
(cfs)
Time to
Peak
(hrs)
Hydrograph
Volume
(cuft)
Inflow
Hyd(s)
Maximum
Elevation
(ft)
Maximum
Storage
(cuft)
1 NRCS Runoff EX-101 0.611 12.12 1,910 ----
2 NRCS Runoff EX-102 ROOF 1.323 12.12 4,790 ----
3 Junction EX-100 1.935 12.12 6,699 1, 2
4 NRCS Runoff EX-200 (SYSTEM #1) 1.248 12.12 3,885 ----
5 NRCS Runoff EX-300 0.564 12.12 1,761 ----
6 Junction EX-SYSTEM #3 2.499 12.12 8,460 3, 5
7 NRCS Runoff PR-101 1.008 12.12 3,222 ----
8 NRCS Runoff PR-102 ROOF 0.740 12.12 2,342 ----
9 Junction PR-100 1.749 12.12 5,563 7, 8
10 Pond Route PR-102 ROOF INF 0.000 20.78 0.000 8 194.43 892
11 NRCS Runoff PR-200 (SYSTEM #1) 1.105 12.12 3,416 ----
12 NRCS Runoff PR-300 0.598 12.12 1,881 ----
13 Junction PR-SYSTEM #3 2.347 12.12 7,445 9, 12
14 Rational PR-200 STC 900 5.204 0.08 2,342 ----
39

Page 123

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-101 Hyd. No. 1
Hydrograph Type = NRCS Runoff Peak Flow = 0.611 cfs
Storm Frequency = 5-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 1,910 cuft
Drainage Area = 0.191 ac Curve Number = 83.48*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 4.39 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.144 98.00 Impervious
0.047 39.00 Landscape
0.191 83.48 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
0.55
0.6
0.65
0.7
0.75
0.8
0.85
0.9
0.95
1
Qp = 0.611 cfs
40

Page 124

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-102 ROOF Hyd. No. 2
Hydrograph Type = NRCS Runoff Peak Flow = 1.323 cfs
Storm Frequency = 5-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 4,790 cuft
Drainage Area = 0.308 ac Curve Number = 98.00*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 4.39 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.308 98.00 Impervious
0.308 98.00 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.323 cfs
41

Page 125

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-100 Hyd. No. 3
Hydrograph Type = Junction Peak Flow = 1.935 cfs
Storm Frequency = 5-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 6,699 cuft
Inflow Hydrographs = 1, 2 Total Contrib. Area = 0.499 ac
EX-101 EX-102 ROOF EX-100
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.935 cfs
42

Page 126

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-200 (SYSTEM #1) Hyd. No. 4
Hydrograph Type = NRCS Runoff Peak Flow = 1.248 cfs
Storm Frequency = 5-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 3,885 cuft
Drainage Area = 0.401 ac Curve Number = 82.55*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 4.39 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.296 98.00 Impervious
0.105 39.00 Landscape
0.401 82.55 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.248 cfs
43

Page 127

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-300 Hyd. No. 5
Hydrograph Type = NRCS Runoff Peak Flow = 0.564 cfs
Storm Frequency = 5-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 1,761 cuft
Drainage Area = 0.177 ac Curve Number = 83.33*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 4.39 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.133 98.00 Impervious
0.044 39.00 Landscape
0.177 83.33 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
0.55
0.6
0.65
0.7
0.75
0.8
0.85
0.9
0.95
1
Qp = 0.564 cfs
44

Page 128

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-SYSTEM #3 Hyd. No. 6
Hydrograph Type = Junction Peak Flow = 2.499 cfs
Storm Frequency = 5-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 8,460 cuft
Inflow Hydrographs = 5 Total Contrib. Area = 0.177 ac
EX-100 EX-300 EX-SYSTEM #3
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
Qp = 2.499 cfs
45

Page 129

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-101 Hyd. No. 7
Hydrograph Type = NRCS Runoff Peak Flow = 1.008 cfs
Storm Frequency = 5-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 3,222 cuft
Drainage Area = 0.278 ac Curve Number = 88.03*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 4.39 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.231 98.00 Impervious
0.047 39.00 Landscape
0.278 88.03 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.008 cfs
46

Page 130

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-102 ROOF Hyd. No. 8
Hydrograph Type = NRCS Runoff Peak Flow = 0.740 cfs
Storm Frequency = 5-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 2,342 cuft
Drainage Area = 0.213 ac Curve Number = 86.37*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 4.39 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.171 98.00 Impervious
0.042 39.00 Landscape
0.213 86.37 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
0.55
0.6
0.65
0.7
0.75
0.8
0.85
0.9
0.95
1
Qp = 0.740 cfs
47

Page 131

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-100 Hyd. No. 9
Hydrograph Type = Junction Peak Flow = 1.749 cfs
Storm Frequency = 5-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 5,563 cuft
Inflow Hydrographs = 7, 8 Total Contrib. Area = 0.491 ac
PR-101 PR-102 ROOF PR-100
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.749 cfs
48

Page 132

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-102 ROOF INF Hyd. No. 10
Hydrograph Type = Pond Route Peak Flow = 0.000 cfs
Storm Frequency = 5-yr Time to Peak = 20.78 hrs
Time Interval = 1 min Hydrograph Volume = 0.000 cuft
Inflow Hydrograph = 8 - PR-102 ROOF Max. Elevation = 194.43 ft
Pond Name = F-ROOF INF-100 Max. Storage = 892 cuft
Pond Routing by Storage Indication Method
PR-102 ROOF PR-102 ROOF INF
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
0.55
0.6
0.65
0.7
0.75
0.8
0.85
0.9
0.95
1
Qp = 0.000 cfs
49

Page 133

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-200 (SYSTEM #1) Hyd. No. 11
Hydrograph Type = NRCS Runoff Peak Flow = 1.105 cfs
Storm Frequency = 5-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 3,416 cuft
Drainage Area = 0.405 ac Curve Number = 78.62*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 4.39 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.272 98.00 Impervious
0.133 39.00 Landscape
0.405 78.62 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.105 cfs
50

Page 134

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-300 Hyd. No. 12
Hydrograph Type = NRCS Runoff Peak Flow = 0.598 cfs
Storm Frequency = 5-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 1,881 cuft
Drainage Area = 0.177 ac Curve Number = 85.33*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 4.39 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.139 98.00 Impervious
0.038 39.00 Landscape
0.177 85.33 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
0.55
0.6
0.65
0.7
0.75
0.8
0.85
0.9
0.95
1
Qp = 0.598 cfs
51

Page 135

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-SYSTEM #3 Hyd. No. 13
Hydrograph Type = Junction Peak Flow = 2.347 cfs
Storm Frequency = 5-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 7,445 cuft
Inflow Hydrographs = 12 Total Contrib. Area = 0.177 ac
PR-100 PR-300 PR-SYSTEM #3
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
Qp = 2.347 cfs
52

Page 136

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-200 STC 900 Hyd. No. 14
Hydrograph Type = Rational Peak Flow = 5.204 cfs
Storm Frequency = 5-yr Time to Peak = 0.08 hrs
Time Interval = 1 min Runoff Volume = 2,342 cuft
Drainage Area = 1.14 ac Runoff Coeff. = 0.72*
Tc Method = User Time of Conc. (Tc) = 5.0 min
IDF Curve = 20260625DORSET LOT F NOAA IDF.idf Intensity = 6.34 in/hr
Freq. Corr. Factor = 1.00 Asc/Rec Limb Factors = 1/2
* Composite C Worksheet
AREA (ac) C DESCRIPTION
0.792 0.90 Impervious
0.348 0.30 Landscape
1.14 0.72
Time (min)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
0
1
2
3
4
5
6
Qp = 5.204 cfs
53

Page 137

Design Storm Report
Custom Storm filename: 
Hydrology Studio v 3.0.0.44 06-29-2026
Storm Distribution: NOAA-D, 24-hr
Total Rainfall Volume (in)Storm
Duration 1-yr 2-yr 3-yr ✔ 5-yr 10-yr 25-yr 50-yr 100-yr
24 hrs 2.62 3.29 0.00 4.39 5.30 6.56 7.47 8.49
Incremental Rainfall Distribution, 5-yr
Time Time Time Time TimePrecip Precip Precip Precip Precip
(hrs) (hrs) (hrs) (hrs) (hrs)(in) (in) (in) (in) (in)
11.60 0.013243
11.62 0.013939
11.63 0.013938
11.65 0.013939
11.67 0.013938
11.68 0.013939
11.70 0.013938
11.72 0.019118
11.73 0.019119
11.75 0.019118
11.77 0.019119
11.78 0.019118
11.80 0.019120
11.82 0.026530
11.83 0.026531
11.85 0.026530
11.87 0.026530
11.88 0.026531
11.90 0.026530
11.92 0.045767
11.93 0.045765
11.95 0.045767
11.97 0.045765
11.98 0.045767
12.00 0.045764
12.02 0.076362
12.03 0.076366
12.05 0.076362
12.07 0.076366
12.08 0.076362
12.10 0.076366
12.12 0.026530
12.13 0.026531
12.15 0.026530
12.17 0.026530
12.18 0.026531
12.20 0.026530
12.22 0.019119
12.23 0.019118
12.25 0.019119
12.27 0.019118
12.28 0.019119
12.30 0.019118
12.32 0.013938
12.33 0.013939
12.35 0.013938
12.37 0.013939
12.38 0.013938
12.40 0.013939
12.42 0.013243
12.43 0.013244
12.45 0.013243
12.47 0.013243
12.48 0.013244
12.50 0.013243
Time (hrs)
0 2 4 6 8 10 12 14 16 18 20 22 24
0
1
2
3
4
5
0
1
2
3
4
5
54

Page 138

Hydrograph 10-yr Summary
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
Hyd.
No.
Hydrograph
Type
Hydrograph
Name
Peak
Flow
(cfs)
Time to
Peak
(hrs)
Hydrograph
Volume
(cuft)
Inflow
Hyd(s)
Maximum
Elevation
(ft)
Maximum
Storage
(cuft)
1 NRCS Runoff EX-101 0.792 12.12 2,498 ----
2 NRCS Runoff EX-102 ROOF 1.601 12.12 5,837 ----
3 Junction EX-100 2.392 12.12 8,336 1, 2
4 NRCS Runoff EX-200 (SYSTEM #1) 1.625 12.12 5,108 ----
5 NRCS Runoff EX-300 0.731 12.12 2,305 ----
6 Junction EX-SYSTEM #3 3.123 12.12 10,641 3, 5
7 NRCS Runoff PR-101 1.272 12.12 4,119 ----
8 NRCS Runoff PR-102 ROOF 0.942 12.12 3,019 ----
9 Junction PR-100 2.214 12.12 7,137 7, 8
10 Pond Route PR-102 ROOF INF 0.000 5.25 0.000 8 194.93 1,272
11 NRCS Runoff PR-200 (SYSTEM #1) 1.477 12.12 4,588 ----
12 NRCS Runoff PR-300 0.766 12.12 2,438 ----
13 Junction PR-SYSTEM #3 2.979 12.12 9,575 9, 12
14 Rational PR-200 STC 900 6.107 0.08 2,748 ----
55

Page 139

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-101 Hyd. No. 1
Hydrograph Type = NRCS Runoff Peak Flow = 0.792 cfs
Storm Frequency = 10-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 2,498 cuft
Drainage Area = 0.191 ac Curve Number = 83.48*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 5.30 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.144 98.00 Impervious
0.047 39.00 Landscape
0.191 83.48 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
0.55
0.6
0.65
0.7
0.75
0.8
0.85
0.9
0.95
1
Qp = 0.792 cfs
56

Page 140

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-102 ROOF Hyd. No. 2
Hydrograph Type = NRCS Runoff Peak Flow = 1.601 cfs
Storm Frequency = 10-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 5,837 cuft
Drainage Area = 0.308 ac Curve Number = 98.00*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 5.30 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.308 98.00 Impervious
0.308 98.00 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.601 cfs
57

Page 141

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-100 Hyd. No. 3
Hydrograph Type = Junction Peak Flow = 2.392 cfs
Storm Frequency = 10-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 8,336 cuft
Inflow Hydrographs = 1, 2 Total Contrib. Area = 0.499 ac
EX-101 EX-102 ROOF EX-100
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
Qp = 2.392 cfs
58

Page 142

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-200 (SYSTEM #1) Hyd. No. 4
Hydrograph Type = NRCS Runoff Peak Flow = 1.625 cfs
Storm Frequency = 10-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 5,108 cuft
Drainage Area = 0.401 ac Curve Number = 82.55*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 5.30 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.296 98.00 Impervious
0.105 39.00 Landscape
0.401 82.55 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.625 cfs
59

Page 143

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-300 Hyd. No. 5
Hydrograph Type = NRCS Runoff Peak Flow = 0.731 cfs
Storm Frequency = 10-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 2,305 cuft
Drainage Area = 0.177 ac Curve Number = 83.33*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 5.30 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.133 98.00 Impervious
0.044 39.00 Landscape
0.177 83.33 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
0.55
0.6
0.65
0.7
0.75
0.8
0.85
0.9
0.95
1
Qp = 0.731 cfs
60

Page 144

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-SYSTEM #3 Hyd. No. 6
Hydrograph Type = Junction Peak Flow = 3.123 cfs
Storm Frequency = 10-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 10,641 cuft
Inflow Hydrographs = 5 Total Contrib. Area = 0.177 ac
EX-100 EX-300 EX-SYSTEM #3
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
4
Qp = 3.123 cfs
61

Page 145

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-101 Hyd. No. 7
Hydrograph Type = NRCS Runoff Peak Flow = 1.272 cfs
Storm Frequency = 10-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 4,119 cuft
Drainage Area = 0.278 ac Curve Number = 88.03*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 5.30 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.231 98.00 Impervious
0.047 39.00 Landscape
0.278 88.03 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.272 cfs
62

Page 146

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-102 ROOF Hyd. No. 8
Hydrograph Type = NRCS Runoff Peak Flow = 0.942 cfs
Storm Frequency = 10-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 3,019 cuft
Drainage Area = 0.213 ac Curve Number = 86.37*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 5.30 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.171 98.00 Impervious
0.042 39.00 Landscape
0.213 86.37 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
0.55
0.6
0.65
0.7
0.75
0.8
0.85
0.9
0.95
1
Qp = 0.942 cfs
63

Page 147

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-100 Hyd. No. 9
Hydrograph Type = Junction Peak Flow = 2.214 cfs
Storm Frequency = 10-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 7,137 cuft
Inflow Hydrographs = 7, 8 Total Contrib. Area = 0.491 ac
PR-101 PR-102 ROOF PR-100
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
Qp = 2.214 cfs
64

Page 148

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-102 ROOF INF Hyd. No. 10
Hydrograph Type = Pond Route Peak Flow = 0.000 cfs
Storm Frequency = 10-yr Time to Peak = 5.25 hrs
Time Interval = 1 min Hydrograph Volume = 0.000 cuft
Inflow Hydrograph = 8 - PR-102 ROOF Max. Elevation = 194.93 ft
Pond Name = F-ROOF INF-100 Max. Storage = 1,272 cuft
Pond Routing by Storage Indication Method
PR-102 ROOF PR-102 ROOF INF
Time (hrs)
0 1 2 3 4 5 6
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
0.55
0.6
0.65
0.7
0.75
0.8
0.85
0.9
0.95
1
Qp = 0.000 cfs
65

Page 149

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-200 (SYSTEM #1) Hyd. No. 11
Hydrograph Type = NRCS Runoff Peak Flow = 1.477 cfs
Storm Frequency = 10-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 4,588 cuft
Drainage Area = 0.405 ac Curve Number = 78.62*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 5.30 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.272 98.00 Impervious
0.133 39.00 Landscape
0.405 78.62 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.477 cfs
66

Page 150

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-300 Hyd. No. 12
Hydrograph Type = NRCS Runoff Peak Flow = 0.766 cfs
Storm Frequency = 10-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 2,438 cuft
Drainage Area = 0.177 ac Curve Number = 85.33*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 5.30 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.139 98.00 Impervious
0.038 39.00 Landscape
0.177 85.33 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
0.55
0.6
0.65
0.7
0.75
0.8
0.85
0.9
0.95
1
Qp = 0.766 cfs
67

Page 151

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-SYSTEM #3 Hyd. No. 13
Hydrograph Type = Junction Peak Flow = 2.979 cfs
Storm Frequency = 10-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 9,575 cuft
Inflow Hydrographs = 12 Total Contrib. Area = 0.177 ac
PR-100 PR-300 PR-SYSTEM #3
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
Qp = 2.979 cfs
68

Page 152

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-200 STC 900 Hyd. No. 14
Hydrograph Type = Rational Peak Flow = 6.107 cfs
Storm Frequency = 10-yr Time to Peak = 0.08 hrs
Time Interval = 1 min Runoff Volume = 2,748 cuft
Drainage Area = 1.14 ac Runoff Coeff. = 0.72*
Tc Method = User Time of Conc. (Tc) = 5.0 min
IDF Curve = 20260625DORSET LOT F NOAA IDF.idf Intensity = 7.44 in/hr
Freq. Corr. Factor = 1.00 Asc/Rec Limb Factors = 1/2
* Composite C Worksheet
AREA (ac) C DESCRIPTION
0.792 0.90 Impervious
0.348 0.30 Landscape
1.14 0.72
Time (min)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
0
1
2
3
4
5
6
7
Qp = 6.107 cfs
69

Page 153

Design Storm Report
Custom Storm filename: 
Hydrology Studio v 3.0.0.44 06-29-2026
Storm Distribution: NOAA-D, 24-hr
Total Rainfall Volume (in)Storm
Duration 1-yr 2-yr 3-yr 5-yr ✔ 10-yr 25-yr 50-yr 100-yr
24 hrs 2.62 3.29 0.00 4.39 5.30 6.56 7.47 8.49
Incremental Rainfall Distribution, 10-yr
Time Time Time Time TimePrecip Precip Precip Precip Precip
(hrs) (hrs) (hrs) (hrs) (hrs)(in) (in) (in) (in) (in)
11.60 0.015988
11.62 0.016828
11.63 0.016827
11.65 0.016828
11.67 0.016827
11.68 0.016828
11.70 0.016827
11.72 0.023081
11.73 0.023082
11.75 0.023081
11.77 0.023082
11.78 0.023081
11.80 0.023084
11.82 0.032029
11.83 0.032031
11.85 0.032029
11.87 0.032029
11.88 0.032031
11.90 0.032029
11.92 0.055254
11.93 0.055251
11.95 0.055254
11.97 0.055251
11.98 0.055254
12.00 0.055250
12.02 0.092191
12.03 0.092196
12.05 0.092191
12.07 0.092196
12.08 0.092191
12.10 0.092196
12.12 0.032029
12.13 0.032031
12.15 0.032029
12.17 0.032029
12.18 0.032031
12.20 0.032029
12.22 0.023082
12.23 0.023081
12.25 0.023082
12.27 0.023081
12.28 0.023082
12.30 0.023080
12.32 0.016827
12.33 0.016828
12.35 0.016827
12.37 0.016828
12.38 0.016827
12.40 0.016829
12.42 0.015988
12.43 0.015989
12.45 0.015988
12.47 0.015988
12.48 0.015989
12.50 0.015988
Time (hrs)
0 2 4 6 8 10 12 14 16 18 20 22 24
0
1
2
3
4
5
6
0
1
2
3
4
5
6
70

Page 154

Hydrograph 25-yr Summary
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
Hyd.
No.
Hydrograph
Type
Hydrograph
Name
Peak
Flow
(cfs)
Time to
Peak
(hrs)
Hydrograph
Volume
(cuft)
Inflow
Hyd(s)
Maximum
Elevation
(ft)
Maximum
Storage
(cuft)
1 NRCS Runoff EX-101 1.042 12.12 3,336 ----
2 NRCS Runoff EX-102 ROOF 1.984 12.12 7,288 ----
3 Junction EX-100 3.027 12.12 10,625 1, 2
4 NRCS Runoff EX-200 (SYSTEM #1) 2.151 12.12 6,852 ----
5 NRCS Runoff EX-300 0.963 12.12 3,081 ----
6 Junction EX-SYSTEM #3 3.990 12.12 13,706 3, 5
7 NRCS Runoff PR-101 1.634 12.12 5,380 ----
8 NRCS Runoff PR-102 ROOF 1.221 12.12 3,975 ----
9 Junction PR-100 2.855 12.12 9,355 7, 8
10 Pond Route PR-102 ROOF INF 0.000 9.10 0.000 8 195.71 1,837
11 NRCS Runoff PR-200 (SYSTEM #1) 2.003 12.12 6,282 ----
12 NRCS Runoff PR-300 0.998 12.12 3,226 ----
13 Junction PR-SYSTEM #3 3.853 12.12 12,581 9, 12
14 Rational PR-200 STC 900 8.108 0.08 3,649 ----
71

Page 155

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-101 Hyd. No. 1
Hydrograph Type = NRCS Runoff Peak Flow = 1.042 cfs
Storm Frequency = 25-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 3,336 cuft
Drainage Area = 0.191 ac Curve Number = 83.48*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 6.56 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.144 98.00 Impervious
0.047 39.00 Landscape
0.191 83.48 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.042 cfs
72

Page 156

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-102 ROOF Hyd. No. 2
Hydrograph Type = NRCS Runoff Peak Flow = 1.984 cfs
Storm Frequency = 25-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 7,288 cuft
Drainage Area = 0.308 ac Curve Number = 98.00*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 6.56 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.308 98.00 Impervious
0.308 98.00 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.984 cfs
73

Page 157

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-100 Hyd. No. 3
Hydrograph Type = Junction Peak Flow = 3.027 cfs
Storm Frequency = 25-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 10,625 cuft
Inflow Hydrographs = 1, 2 Total Contrib. Area = 0.499 ac
EX-101 EX-102 ROOF EX-100
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
4
Qp = 3.027 cfs
74

Page 158

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-200 (SYSTEM #1) Hyd. No. 4
Hydrograph Type = NRCS Runoff Peak Flow = 2.151 cfs
Storm Frequency = 25-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 6,852 cuft
Drainage Area = 0.401 ac Curve Number = 82.55*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 6.56 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.296 98.00 Impervious
0.105 39.00 Landscape
0.401 82.55 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
Qp = 2.151 cfs
75

Page 159

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-300 Hyd. No. 5
Hydrograph Type = NRCS Runoff Peak Flow = 0.963 cfs
Storm Frequency = 25-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 3,081 cuft
Drainage Area = 0.177 ac Curve Number = 83.33*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 6.56 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.133 98.00 Impervious
0.044 39.00 Landscape
0.177 83.33 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
0.55
0.6
0.65
0.7
0.75
0.8
0.85
0.9
0.95
1
Qp = 0.963 cfs
76

Page 160

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-SYSTEM #3 Hyd. No. 6
Hydrograph Type = Junction Peak Flow = 3.990 cfs
Storm Frequency = 25-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 13,706 cuft
Inflow Hydrographs = 5 Total Contrib. Area = 0.177 ac
EX-100 EX-300 EX-SYSTEM #3
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
4
Qp = 3.990 cfs
77

Page 161

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-101 Hyd. No. 7
Hydrograph Type = NRCS Runoff Peak Flow = 1.634 cfs
Storm Frequency = 25-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 5,380 cuft
Drainage Area = 0.278 ac Curve Number = 88.03*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 6.56 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.231 98.00 Impervious
0.047 39.00 Landscape
0.278 88.03 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.634 cfs
78

Page 162

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-102 ROOF Hyd. No. 8
Hydrograph Type = NRCS Runoff Peak Flow = 1.221 cfs
Storm Frequency = 25-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 3,975 cuft
Drainage Area = 0.213 ac Curve Number = 86.37*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 6.56 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.171 98.00 Impervious
0.042 39.00 Landscape
0.213 86.37 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.221 cfs
79

Page 163

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-100 Hyd. No. 9
Hydrograph Type = Junction Peak Flow = 2.855 cfs
Storm Frequency = 25-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 9,355 cuft
Inflow Hydrographs = 7, 8 Total Contrib. Area = 0.491 ac
PR-101 PR-102 ROOF PR-100
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
Qp = 2.855 cfs
80

Page 164

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-102 ROOF INF Hyd. No. 10
Hydrograph Type = Pond Route Peak Flow = 0.000 cfs
Storm Frequency = 25-yr Time to Peak = 9.10 hrs
Time Interval = 1 min Hydrograph Volume = 0.000 cuft
Inflow Hydrograph = 8 - PR-102 ROOF Max. Elevation = 195.71 ft
Pond Name = F-ROOF INF-100 Max. Storage = 1,837 cuft
Pond Routing by Storage Indication Method
PR-102 ROOF PR-102 ROOF INF
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 0.000 cfs
81

Page 165

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-200 (SYSTEM #1) Hyd. No. 11
Hydrograph Type = NRCS Runoff Peak Flow = 2.003 cfs
Storm Frequency = 25-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 6,282 cuft
Drainage Area = 0.405 ac Curve Number = 78.62*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 6.56 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.272 98.00 Impervious
0.133 39.00 Landscape
0.405 78.62 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
Qp = 2.003 cfs
82

Page 166

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-300 Hyd. No. 12
Hydrograph Type = NRCS Runoff Peak Flow = 0.998 cfs
Storm Frequency = 25-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 3,226 cuft
Drainage Area = 0.177 ac Curve Number = 85.33*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 6.56 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.139 98.00 Impervious
0.038 39.00 Landscape
0.177 85.33 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
0.55
0.6
0.65
0.7
0.75
0.8
0.85
0.9
0.95
1
Qp = 0.998 cfs
83

Page 167

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-SYSTEM #3 Hyd. No. 13
Hydrograph Type = Junction Peak Flow = 3.853 cfs
Storm Frequency = 25-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 12,581 cuft
Inflow Hydrographs = 12 Total Contrib. Area = 0.177 ac
PR-100 PR-300 PR-SYSTEM #3
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
4
Qp = 3.853 cfs
84

Page 168

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-200 STC 900 Hyd. No. 14
Hydrograph Type = Rational Peak Flow = 8.108 cfs
Storm Frequency = 25-yr Time to Peak = 0.08 hrs
Time Interval = 1 min Runoff Volume = 3,649 cuft
Drainage Area = 1.14 ac Runoff Coeff. = 0.72*
Tc Method = User Time of Conc. (Tc) = 5.0 min
IDF Curve = 20260625DORSET LOT F NOAA IDF.idf Intensity = 8.98 in/hr
Freq. Corr. Factor = 1.10 Asc/Rec Limb Factors = 1/2
* Composite C Worksheet
AREA (ac) C DESCRIPTION
0.792 0.90 Impervious
0.348 0.30 Landscape
1.14 0.72
Time (min)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
0
1
2
3
4
5
6
7
8
9
Qp = 8.108 cfs
85

Page 169

Design Storm Report
Custom Storm filename: 
Hydrology Studio v 3.0.0.44 06-29-2026
Storm Distribution: NOAA-D, 24-hr
Total Rainfall Volume (in)Storm
Duration 1-yr 2-yr 3-yr 5-yr 10-yr ✔ 25-yr 50-yr 100-yr
24 hrs 2.62 3.29 0.00 4.39 5.30 6.56 7.47 8.49
Incremental Rainfall Distribution, 25-yr
Time Time Time Time TimePrecip Precip Precip Precip Precip
(hrs) (hrs) (hrs) (hrs) (hrs)(in) (in) (in) (in) (in)
11.60 0.019789
11.62 0.020828
11.63 0.020828
11.65 0.020829
11.67 0.020827
11.68 0.020829
11.70 0.020827
11.72 0.028568
11.73 0.028570
11.75 0.028568
11.77 0.028570
11.78 0.028568
11.80 0.028571
11.82 0.039643
11.83 0.039645
11.85 0.039644
11.87 0.039643
11.88 0.039645
11.90 0.039644
11.92 0.068389
11.93 0.068386
11.95 0.068390
11.97 0.068386
11.98 0.068390
12.00 0.068385
12.02 0.114108
12.03 0.114115
12.05 0.114109
12.07 0.114115
12.08 0.114108
12.10 0.114115
12.12 0.039643
12.13 0.039646
12.15 0.039643
12.17 0.039644
12.18 0.039645
12.20 0.039643
12.22 0.028569
12.23 0.028568
12.25 0.028570
12.27 0.028568
12.28 0.028570
12.30 0.028567
12.32 0.020827
12.33 0.020829
12.35 0.020827
12.37 0.020829
12.38 0.020827
12.40 0.020829
12.42 0.019789
12.43 0.019790
12.45 0.019789
12.47 0.019789
12.48 0.019790
12.50 0.019789
Time (hrs)
0 2 4 6 8 10 12 14 16 18 20 22 24
0
1
2
3
4
5
6
7
0
1
2
3
4
5
6
7
86

Page 170

Hydrograph 50-yr Summary
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
Hyd.
No.
Hydrograph
Type
Hydrograph
Name
Peak
Flow
(cfs)
Time to
Peak
(hrs)
Hydrograph
Volume
(cuft)
Inflow
Hyd(s)
Maximum
Elevation
(ft)
Maximum
Storage
(cuft)
1 NRCS Runoff EX-101 1.223 12.12 3,952 ----
2 NRCS Runoff EX-102 ROOF 2.261 12.12 8,337 ----
3 Junction EX-100 3.485 12.12 12,289 1, 2
4 NRCS Runoff EX-200 (SYSTEM #1) 2.531 12.12 8,138 ----
5 NRCS Runoff EX-300 1.131 12.12 3,651 ----
6 Junction EX-SYSTEM #3 4.615 12.12 15,940 3, 5
7 NRCS Runoff PR-101 1.894 12.12 6,301 ----
8 NRCS Runoff PR-102 ROOF 1.422 12.12 4,674 ----
9 Junction PR-100 3.316 12.12 10,974 7, 8
10 Pond Route PR-102 ROOF INF 0.000 6.12 0.000 8 196.34 2,270
11 NRCS Runoff PR-200 (SYSTEM #1) 2.386 12.12 7,540 ----
12 NRCS Runoff PR-300 1.165 12.12 3,804 ----
13 Junction PR-SYSTEM #3 4.481 12.12 14,778 9, 12
14 Rational PR-200 STC 900 9.948 0.08 4,477 ----
87

Page 171

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-101 Hyd. No. 1
Hydrograph Type = NRCS Runoff Peak Flow = 1.223 cfs
Storm Frequency = 50-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 3,952 cuft
Drainage Area = 0.191 ac Curve Number = 83.48*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 7.47 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.144 98.00 Impervious
0.047 39.00 Landscape
0.191 83.48 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.223 cfs
88

Page 172

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-102 ROOF Hyd. No. 2
Hydrograph Type = NRCS Runoff Peak Flow = 2.261 cfs
Storm Frequency = 50-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 8,337 cuft
Drainage Area = 0.308 ac Curve Number = 98.00*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 7.47 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.308 98.00 Impervious
0.308 98.00 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
Qp = 2.261 cfs
89

Page 173

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-100 Hyd. No. 3
Hydrograph Type = Junction Peak Flow = 3.485 cfs
Storm Frequency = 50-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 12,289 cuft
Inflow Hydrographs = 1, 2 Total Contrib. Area = 0.499 ac
EX-101 EX-102 ROOF EX-100
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
4
Qp = 3.485 cfs
90

Page 174

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-200 (SYSTEM #1) Hyd. No. 4
Hydrograph Type = NRCS Runoff Peak Flow = 2.531 cfs
Storm Frequency = 50-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 8,138 cuft
Drainage Area = 0.401 ac Curve Number = 82.55*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 7.47 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.296 98.00 Impervious
0.105 39.00 Landscape
0.401 82.55 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
Qp = 2.531 cfs
91

Page 175

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-300 Hyd. No. 5
Hydrograph Type = NRCS Runoff Peak Flow = 1.131 cfs
Storm Frequency = 50-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 3,651 cuft
Drainage Area = 0.177 ac Curve Number = 83.33*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 7.47 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.133 98.00 Impervious
0.044 39.00 Landscape
0.177 83.33 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.131 cfs
92

Page 176

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-SYSTEM #3 Hyd. No. 6
Hydrograph Type = Junction Peak Flow = 4.615 cfs
Storm Frequency = 50-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 15,940 cuft
Inflow Hydrographs = 5 Total Contrib. Area = 0.177 ac
EX-100 EX-300 EX-SYSTEM #3
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
4
5
Qp = 4.615 cfs
93

Page 177

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-101 Hyd. No. 7
Hydrograph Type = NRCS Runoff Peak Flow = 1.894 cfs
Storm Frequency = 50-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 6,301 cuft
Drainage Area = 0.278 ac Curve Number = 88.03*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 7.47 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.231 98.00 Impervious
0.047 39.00 Landscape
0.278 88.03 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.894 cfs
94

Page 178

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-102 ROOF Hyd. No. 8
Hydrograph Type = NRCS Runoff Peak Flow = 1.422 cfs
Storm Frequency = 50-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 4,674 cuft
Drainage Area = 0.213 ac Curve Number = 86.37*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 7.47 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.171 98.00 Impervious
0.042 39.00 Landscape
0.213 86.37 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.422 cfs
95

Page 179

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-100 Hyd. No. 9
Hydrograph Type = Junction Peak Flow = 3.316 cfs
Storm Frequency = 50-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 10,974 cuft
Inflow Hydrographs = 7, 8 Total Contrib. Area = 0.491 ac
PR-101 PR-102 ROOF PR-100
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
4
Qp = 3.316 cfs
96

Page 180

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-102 ROOF INF Hyd. No. 10
Hydrograph Type = Pond Route Peak Flow = 0.000 cfs
Storm Frequency = 50-yr Time to Peak = 6.12 hrs
Time Interval = 1 min Hydrograph Volume = 0.000 cuft
Inflow Hydrograph = 8 - PR-102 ROOF Max. Elevation = 196.34 ft
Pond Name = F-ROOF INF-100 Max. Storage = 2,270 cuft
Pond Routing by Storage Indication Method
PR-102 ROOF PR-102 ROOF INF
Time (hrs)
0 1 2 3 4 5 6 7
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 0.000 cfs
97

Page 181

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-200 (SYSTEM #1) Hyd. No. 11
Hydrograph Type = NRCS Runoff Peak Flow = 2.386 cfs
Storm Frequency = 50-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 7,540 cuft
Drainage Area = 0.405 ac Curve Number = 78.62*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 7.47 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.272 98.00 Impervious
0.133 39.00 Landscape
0.405 78.62 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
Qp = 2.386 cfs
98

Page 182

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-300 Hyd. No. 12
Hydrograph Type = NRCS Runoff Peak Flow = 1.165 cfs
Storm Frequency = 50-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 3,804 cuft
Drainage Area = 0.177 ac Curve Number = 85.33*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 7.47 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.139 98.00 Impervious
0.038 39.00 Landscape
0.177 85.33 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.165 cfs
99

Page 183

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-SYSTEM #3 Hyd. No. 13
Hydrograph Type = Junction Peak Flow = 4.481 cfs
Storm Frequency = 50-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 14,778 cuft
Inflow Hydrographs = 12 Total Contrib. Area = 0.177 ac
PR-100 PR-300 PR-SYSTEM #3
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
4
5
Qp = 4.481 cfs
100

Page 184

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-200 STC 900 Hyd. No. 14
Hydrograph Type = Rational Peak Flow = 9.948 cfs
Storm Frequency = 50-yr Time to Peak = 0.08 hrs
Time Interval = 1 min Runoff Volume = 4,477 cuft
Drainage Area = 1.14 ac Runoff Coeff. = 0.72*
Tc Method = User Time of Conc. (Tc) = 5.0 min
IDF Curve = 20260625DORSET LOT F NOAA IDF.idf Intensity = 10.10 in/hr
Freq. Corr. Factor = 1.20 Asc/Rec Limb Factors = 1/2
* Composite C Worksheet
AREA (ac) C DESCRIPTION
0.792 0.90 Impervious
0.348 0.30 Landscape
1.14 0.72
Time (min)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
0
1
2
3
4
5
6
7
8
9
10
11
Qp = 9.948 cfs
101

Page 185

Design Storm Report
Custom Storm filename: 
Hydrology Studio v 3.0.0.44 06-29-2026
Storm Distribution: NOAA-D, 24-hr
Total Rainfall Volume (in)Storm
Duration 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr ✔ 50-yr 100-yr
24 hrs 2.62 3.29 0.00 4.39 5.30 6.56 7.47 8.49
Incremental Rainfall Distribution, 50-yr
Time Time Time Time TimePrecip Precip Precip Precip Precip
(hrs) (hrs) (hrs) (hrs) (hrs)(in) (in) (in) (in) (in)
11.60 0.022534
11.62 0.023717
11.63 0.023717
11.65 0.023718
11.67 0.023716
11.68 0.023718
11.70 0.023716
11.72 0.032531
11.73 0.032533
11.75 0.032531
11.77 0.032533
11.78 0.032531
11.80 0.032535
11.82 0.045142
11.83 0.045145
11.85 0.045143
11.87 0.045142
11.88 0.045145
11.90 0.045143
11.92 0.077876
11.93 0.077873
11.95 0.077877
11.97 0.077873
11.98 0.077877
12.00 0.077871
12.02 0.129937
12.03 0.129945
12.05 0.129938
12.07 0.129944
12.08 0.129938
12.10 0.129945
12.12 0.045142
12.13 0.045146
12.15 0.045143
12.17 0.045143
12.18 0.045145
12.20 0.045143
12.22 0.032532
12.23 0.032531
12.25 0.032533
12.27 0.032531
12.28 0.032533
12.30 0.032530
12.32 0.023716
12.33 0.023718
12.35 0.023716
12.37 0.023718
12.38 0.023716
12.40 0.023719
12.42 0.022534
12.43 0.022535
12.45 0.022534
12.47 0.022534
12.48 0.022536
12.50 0.022534
Time (hrs)
0 2 4 6 8 10 12 14 16 18 20 22 24
0
1
2
3
4
5
6
7
8
0
1
2
3
4
5
6
7
8
102

Page 186

Hydrograph 100-yr Summary
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
Hyd.
No.
Hydrograph
Type
Hydrograph
Name
Peak
Flow
(cfs)
Time to
Peak
(hrs)
Hydrograph
Volume
(cuft)
Inflow
Hyd(s)
Maximum
Elevation
(ft)
Maximum
Storage
(cuft)
1 NRCS Runoff EX-101 1.425 12.12 4,650 ----
2 NRCS Runoff EX-102 ROOF 2.571 12.12 9,512 ----
3 Junction EX-100 3.997 12.12 14,162 1, 2
4 NRCS Runoff EX-200 (SYSTEM #1) 2.956 12.12 9,596 ----
5 NRCS Runoff EX-300 1.318 12.12 4,298 ----
6 Junction EX-SYSTEM #3 5.315 12.12 18,460 3, 5
7 NRCS Runoff PR-101 2.185 12.12 7,338 ----
8 NRCS Runoff PR-102 ROOF 1.645 12.12 5,463 ----
9 Junction PR-100 3.830 12.12 12,801 7, 8
10 Pond Route PR-102 ROOF INF 0.106 12.98 363 8 196.71 2,500
11 NRCS Runoff PR-200 (SYSTEM #1) 2.816 12.12 8,975 ----
12 NRCS Runoff PR-300 1.351 12.12 4,457 ----
13 Junction PR-SYSTEM #3 5.181 12.12 17,258 9, 12
14 Rational PR-200 STC 900 11.59 0.08 5,217 ----
103

Page 187

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-101 Hyd. No. 1
Hydrograph Type = NRCS Runoff Peak Flow = 1.425 cfs
Storm Frequency = 100-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 4,650 cuft
Drainage Area = 0.191 ac Curve Number = 83.48*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 8.49 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.144 98.00 Impervious
0.047 39.00 Landscape
0.191 83.48 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.425 cfs
104

Page 188

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-102 ROOF Hyd. No. 2
Hydrograph Type = NRCS Runoff Peak Flow = 2.571 cfs
Storm Frequency = 100-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 9,512 cuft
Drainage Area = 0.308 ac Curve Number = 98.00*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 8.49 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.308 98.00 Impervious
0.308 98.00 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
Qp = 2.571 cfs
105

Page 189

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-100 Hyd. No. 3
Hydrograph Type = Junction Peak Flow = 3.997 cfs
Storm Frequency = 100-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 14,162 cuft
Inflow Hydrographs = 1, 2 Total Contrib. Area = 0.499 ac
EX-101 EX-102 ROOF EX-100
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
4
Qp = 3.997 cfs
106

Page 190

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-200 (SYSTEM #1) Hyd. No. 4
Hydrograph Type = NRCS Runoff Peak Flow = 2.956 cfs
Storm Frequency = 100-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 9,596 cuft
Drainage Area = 0.401 ac Curve Number = 82.55*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 8.49 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.296 98.00 Impervious
0.105 39.00 Landscape
0.401 82.55 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
Qp = 2.956 cfs
107

Page 191

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-300 Hyd. No. 5
Hydrograph Type = NRCS Runoff Peak Flow = 1.318 cfs
Storm Frequency = 100-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 4,298 cuft
Drainage Area = 0.177 ac Curve Number = 83.33*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 8.49 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.133 98.00 Impervious
0.044 39.00 Landscape
0.177 83.33 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.318 cfs
108

Page 192

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
EX-SYSTEM #3 Hyd. No. 6
Hydrograph Type = Junction Peak Flow = 5.315 cfs
Storm Frequency = 100-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 18,460 cuft
Inflow Hydrographs = 5 Total Contrib. Area = 0.177 ac
EX-100 EX-300 EX-SYSTEM #3
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
4
5
6
Qp = 5.315 cfs
109

Page 193

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-101 Hyd. No. 7
Hydrograph Type = NRCS Runoff Peak Flow = 2.185 cfs
Storm Frequency = 100-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 7,338 cuft
Drainage Area = 0.278 ac Curve Number = 88.03*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 8.49 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.231 98.00 Impervious
0.047 39.00 Landscape
0.278 88.03 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
Qp = 2.185 cfs
110

Page 194

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-102 ROOF Hyd. No. 8
Hydrograph Type = NRCS Runoff Peak Flow = 1.645 cfs
Storm Frequency = 100-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 5,463 cuft
Drainage Area = 0.213 ac Curve Number = 86.37*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 8.49 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.171 98.00 Impervious
0.042 39.00 Landscape
0.213 86.37 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.645 cfs
111

Page 195

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-100 Hyd. No. 9
Hydrograph Type = Junction Peak Flow = 3.830 cfs
Storm Frequency = 100-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 12,801 cuft
Inflow Hydrographs = 7, 8 Total Contrib. Area = 0.491 ac
PR-101 PR-102 ROOF PR-100
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
4
Qp = 3.830 cfs
112

Page 196

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-102 ROOF INF Hyd. No. 10
Hydrograph Type = Pond Route Peak Flow = 0.106 cfs
Storm Frequency = 100-yr Time to Peak = 12.98 hrs
Time Interval = 1 min Hydrograph Volume = 363 cuft
Inflow Hydrograph = 8 - PR-102 ROOF Max. Elevation = 196.71 ft
Pond Name = F-ROOF INF-100 Max. Storage = 2,500 cuft
Pond Routing by Storage Indication Method Center of mass detention time = 16 min
PR-102 ROOF PR-102 ROOF INF
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 0.106 cfs
113

Page 197

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-200 (SYSTEM #1) Hyd. No. 11
Hydrograph Type = NRCS Runoff Peak Flow = 2.816 cfs
Storm Frequency = 100-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 8,975 cuft
Drainage Area = 0.405 ac Curve Number = 78.62*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 8.49 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.272 98.00 Impervious
0.133 39.00 Landscape
0.405 78.62 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
Qp = 2.816 cfs
114

Page 198

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-300 Hyd. No. 12
Hydrograph Type = NRCS Runoff Peak Flow = 1.351 cfs
Storm Frequency = 100-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Runoff Volume = 4,457 cuft
Drainage Area = 0.177 ac Curve Number = 85.33*
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 8.49 in Design Storm = NOAA-D
Storm Duration = 24 hrs Shape Factor = 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
0.139 98.00 Impervious
0.038 39.00 Landscape
0.177 85.33 Weighted CN Method Employed
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
Qp = 1.351 cfs
115

Page 199

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-SYSTEM #3 Hyd. No. 13
Hydrograph Type = Junction Peak Flow = 5.181 cfs
Storm Frequency = 100-yr Time to Peak = 12.12 hrs
Time Interval = 1 min Hydrograph Volume = 17,258 cuft
Inflow Hydrographs = 12 Total Contrib. Area = 0.177 ac
PR-100 PR-300 PR-SYSTEM #3
Time (hrs)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0
1
2
3
4
5
6
Qp = 5.181 cfs
116

Page 200

Hydrograph Report
Project Name: DORSET LOT F
Hydrology Studio v 3.0.0.44
File: 20260629DORSET LOT F Hydrology.hys
06-29-2026
PR-200 STC 900 Hyd. No. 14
Hydrograph Type = Rational Peak Flow = 11.59 cfs
Storm Frequency = 100-yr Time to Peak = 0.08 hrs
Time Interval = 1 min Runoff Volume = 5,217 cuft
Drainage Area = 1.14 ac Runoff Coeff. = 0.72*
Tc Method = User Time of Conc. (Tc) = 5.0 min
IDF Curve = 20260625DORSET LOT F NOAA IDF.idf Intensity = 11.30 in/hr
Freq. Corr. Factor = 1.25 Asc/Rec Limb Factors = 1/2
* Composite C Worksheet
AREA (ac) C DESCRIPTION
0.792 0.90 Impervious
0.348 0.30 Landscape
1.14 0.72
Time (min)
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
0
1
2
3
4
5
6
7
8
9
10
11
12
13
Qp = 11.59 cfs
117

Page 201

Design Storm Report
Custom Storm filename: 
Hydrology Studio v 3.0.0.44 06-29-2026
Storm Distribution: NOAA-D, 24-hr
Total Rainfall Volume (in)Storm
Duration 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr ✔ 100-yr
24 hrs 2.62 3.29 0.00 4.39 5.30 6.56 7.47 8.49
Incremental Rainfall Distribution, 100-yr
Time Time Time Time TimePrecip Precip Precip Precip Precip
(hrs) (hrs) (hrs) (hrs) (hrs)(in) (in) (in) (in) (in)
11.60 0.025611
11.62 0.026956
11.63 0.026955
11.65 0.026957
11.67 0.026955
11.68 0.026957
11.70 0.026954
11.72 0.036973
11.73 0.036975
11.75 0.036973
11.77 0.036975
11.78 0.036973
11.80 0.036977
11.82 0.051306
11.83 0.051309
11.85 0.051307
11.87 0.051306
11.88 0.051309
11.90 0.051307
11.92 0.088510
11.93 0.088506
11.95 0.088511
11.97 0.088506
11.98 0.088511
12.00 0.088504
12.02 0.147680
12.03 0.147688
12.05 0.147680
12.07 0.147688
12.08 0.147680
12.10 0.147688
12.12 0.051306
12.13 0.051310
12.15 0.051306
12.17 0.051307
12.18 0.051310
12.20 0.051307
12.22 0.036974
12.23 0.036973
12.25 0.036975
12.27 0.036973
12.28 0.036975
12.30 0.036972
12.32 0.026955
12.33 0.026957
12.35 0.026955
12.37 0.026957
12.38 0.026955
12.40 0.026958
12.42 0.025611
12.43 0.025613
12.45 0.025611
12.47 0.025610
12.48 0.025613
12.50 0.025611
Time (hrs)
0 2 4 6 8 10 12 14 16 18 20 22 24
0
1
2
3
4
5
6
7
8
9
0
1
2
3
4
5
6
7
8
9
118

Page 202

IDF Report
IDF filename: 20260625DORSET LOT F NOAA IDF.idf
06-29-2026Hydrology Studio v 3.0.0.44
Intensity = B / (Tc + D)^E (in/hr)Equation
Coefficients 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr
B 10.0735 11.9924 0.0000 15.1719 17.7838 21.4293 24.0193 26.8587
D 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
E 0.5465 0.5448 0.0000 0.5422 0.5414 0.5404 0.5383 0.5379
Minimum Tc = 5 minutes
Intensity Values (in/hr)Tc
(min) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr
Cf 1.00 1.00 1.00 1.00 1.00 1.10 1.20 1.25
5 4.18 4.99 0 6.34 7.44 8.98 10.10 11.30
10 2.86 3.42 0 4.35 5.11 6.17 6.95 7.78
15 2.29 2.74 0 3.49 4.10 4.96 5.59 6.26
20 1.96 2.34 0 2.99 3.51 4.25 4.79 5.36
25 1.73 2.08 0 2.65 3.11 3.76 4.25 4.75
30 1.57 1.88 0 2.40 2.82 3.41 3.85 4.31
35 1.44 1.73 0 2.21 2.59 3.14 3.54 3.97
40 1.34 1.61 0 2.05 2.41 2.92 3.30 3.69
45 1.26 1.51 0 1.93 2.26 2.74 3.10 3.47
50 1.19 1.42 0 1.82 2.14 2.59 2.92 3.27
55 1.13 1.35 0 1.73 2.03 2.46 2.78 3.11
60 1.07 1.29 0 1.65 1.94 2.34 2.65 2.97
Cf = Correction Factor applied to Rational Method runoff coefficient.
100yr
50yr
25yr
10yr
5yr
2yr
1yr
Time (min)
0 5 10 15 20 25 30 35 40 45 50 55 60
1
2
3
4
5
6
7
8
9
10
11
12
DORSET LOT F
119

Page 203

Precipitation Report
Precipitation filename: 20260625DORSET LOT F NOAA Precipitation.pcp
Hydrology Studio v 3.0.0.44   (Rainfall totals in Inches) 06-29-2026
Active 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr
Active ✔✔ ✔✔✔✔✔
SCS Storms > SCS Dimensionless Storms
SCS 6hr 1.83 2.22 0 2.86 3.39 4.12 4.65 5.24
Type I, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
Type IA, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
Type II, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
Type II FL, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
Type III, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
Synthetic Storms > IDF-Based Synthetic Storms
1-hr 1.07 1.29 0 1.65 1.94 2.34 2.65 2.97
2-hr 1.47 1.77 0 2.26 2.66 3.22 3.65 4.09
3-hr 1.77 2.12 0 2.73 3.21 3.88 4.40 4.93
6-hr 2.42 2.91 0 3.74 4.41 5.34 6.06 6.79
12-hr 3.32 3.99 0 5.14 6.06 7.35 8.35 9.36
24-hr 4.54 5.48 0 7.06 8.32 10.10 11.50 12.89
Huff Distribution > 1st Quartile (0 to 6 hrs)
1-hr 0.99 1.19 0 1.52 1.79 2.16 2.44 2.74
2-hr 1.27 1.52 0 1.94 2.28 2.75 3.10 3.48
3-hr 1.46 1.76 0 2.24 2.63 3.18 3.59 4.02
6-hr 1.83 2.22 0 2.86 3.39 4.12 4.65 5.24
Huff Distribution > 2nd Quartile (>6 to 12 hrs)
8-hr 00000000
12-hr 2.25 2.77 0 3.63 4.34 5.31 6.03 6.82
Huff Distribution > 3rd Quartile (>12 to 24 hrs)
18-hr 00000000
24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
Custom Storms > Custom Storm Distributions
My Custom Storm  1 00000000
My Custom Storm  2 00000000
My Custom Storm  3 00000000
My Custom Storm  4 00000000
My Custom Storm  5 00000000
My Custom Storm  6 00000000
My Custom Storm  7 00000000
My Custom Storm  8 00000000
My Custom Storm  9 00000000
My Custom Storm  10 00000000
120

Page 204

Precipitation Report Cont'd
Precipitation filename: 20260625DORSET LOT F NOAA Precipitation.pcp
Rainfall totals in Inches 06-29-2026
Active 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr
Active ✔✔ ✔✔✔✔✔
Huff Indiana > Indianapolis
30-min 0.78 0.94 0 1.20 1.41 1.70 1.92 2.16
1-hr 0.99 1.19 0 1.52 1.79 2.16 2.44 2.74
2-hr 1.27 1.52 0 1.94 2.28 2.75 3.10 3.48
3-hr 1.46 1.76 0 2.24 2.63 3.18 3.59 4.02
6-hr 1.83 2.22 0 2.86 3.39 4.12 4.65 5.24
12-hr 2.25 2.77 0 3.63 4.34 5.31 6.03 6.82
24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
Huff Indiana > Evansville
30-min 0.78 0.94 0 1.20 1.41 1.70 1.92 2.16
1-hr 0.99 1.19 0 1.52 1.79 2.16 2.44 2.74
2-hr 1.27 1.52 0 1.94 2.28 2.75 3.10 3.48
3-hr 1.46 1.76 0 2.24 2.63 3.18 3.59 4.02
6-hr 1.83 2.22 0 2.86 3.39 4.12 4.65 5.24
12-hr 2.25 2.77 0 3.63 4.34 5.31 6.03 6.82
24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
Huff Indiana > Fort Wayne
30-min 0.78 0.94 0 1.20 1.41 1.70 1.92 2.16
1-hr 0.99 1.19 0 1.52 1.79 2.16 2.44 2.74
2-hr 1.27 1.52 0 1.94 2.28 2.75 3.10 3.48
3-hr 1.46 1.76 0 2.24 2.63 3.18 3.59 4.02
6-hr 1.83 2.22 0 2.86 3.39 4.12 4.65 5.24
12-hr 2.25 2.77 0 3.63 4.34 5.31 6.03 6.82
24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
Huff Indiana > South Bend
30-min 0.78 0.94 0 1.20 1.41 1.70 1.92 2.16
1-hr 0.99 1.19 0 1.52 1.79 2.16 2.44 2.74
2-hr 1.27 1.52 0 1.94 2.28 2.75 3.10 3.48
3-hr 1.46 1.76 0 2.24 2.63 3.18 3.59 4.02
6-hr 1.83 2.22 0 2.86 3.39 4.12 4.65 5.24
12-hr 2.25 2.77 0 3.63 4.34 5.31 6.03 6.82
24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
121

Page 205

Precipitation Report Cont'd
Precipitation filename: 20260625DORSET LOT F NOAA Precipitation.pcp
Rainfall totals in Inches 06-29-2026
Active 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr
Active ✔✔ ✔✔✔✔✔
NRCS Storms > NRCS Dimensionless Storms
NRCS MSE1, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
NRCS MSE2, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
NRCS MSE3, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
NRCS MSE4, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
NRCS MSE5, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
NRCS MSE6, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
NOAA-A, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
NOAA-B, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
NOAA-C, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
NOAA-D, 24-hr ✔ 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
NRCC-A, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
NRCC-B, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
NRCC-C, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
NRCC-D, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
CA-1, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
CA-2, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
CA-3, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
CA-4, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
CA-5, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
CA-6, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
FDOT Storms > Florida DOT Storms
FDOT, 1-hr 0.99 1.19 0 1.52 1.79 2.16 2.44 2.74
FDOT, 2-hr 1.27 1.52 0 1.94 2.28 2.75 3.10 3.48
FDOT, 4-hr 00000000
FDOT, 8-hr 00000000
FDOT, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49
FDOT, 72-hr 00000000
SFWMD, 72-hr 00000000
Austin Storms > Austin Frequency Storms
Austin Zone 1, 24-hr 00000000
Austin Zone 2, 24-hr 00000000
122

Page 206

   DIAMOND SPARKLE CAR WASH 
 10 DORSET CROSSING
 SIMSBURY, CONNECTICUT 
 
  
 
 
 
APPENDIX C 
TREATMENT CALCULATIONS 
SQM TREATMENT SUMMARY TABLE 
TREATMENT CALCULATIONS: PR-102 ROOF 
TREATMENT CALCULATIONS: PR-200 
TREATMENT CALCULATIONS: PR-F-102 
TREATMENT CALCULATIONS: PR-F-301 
TREATMENT CALCULATIONS: EX-101 (APPROVED PAD) 
TREATMENT CALCULATIONS: EX-F-100 (PROPOSED SITE) 

Page 207

Page 208

10 DORSET CROSSING
SIMSBURY, CT
SQM AREA DA IA WQV WQF
Standard Label acre acre acre-ft cfs Method Vol Flow Area Note
2023 PR-102 ROOF 0.213 0.171 0.018 0.22 MC-3500 0.055 N/A N/A 100% WQV
2023 PR-200 1.140 0.792 0.083 1.03 STC 900 N/A 1.4 N/A 100% WQF
2023 PR-F-102 0.129 0.105 0.011 0.14 DEEP SUMP N/A N/A N/A <0.25 AC OK
2023 PR-F-301 0.177 0.139 0.015 0.18 DEEP SUMP N/A N/A N/A <0.25 AC OK
2004 EX-101 0.191 0.144 0.012 0.14 WQ BASIN #3 N/A N/A N/A Approved PAD
2023 EX-F100 0.138 0.126 0.013 0.16 WQ BASIN #3 N/A N/A N/A Negligible Change
PROPOSED TREATMENT
TABLE 2: PROPOSED TREATMENT SUMMARY
SQM TREATMENT SUMMARY TABLE
COMPARISON OF SITE DRAINING TO SYSTEM #1 (WQ BASIN #3) WITHOUT ON-SITE TREATMENT

Page 209

Page 210

Yantic River Consultants, LLC Dorset Crossing Lot F
Simsbury, CT
WQV = Water Quality Volume (acre-feet)
P = 1.3" (90th percentile rainfall event)
(P)(R)(A) R = Volumetric Runoff Coefficient, 0.050 + 0.009(I)
12 I = Percent Impervious Cover, Impervious Area / Total Area DA = 0.213 acres
DA = Drainage Area (Acres) DCIA = 0.171 acres
DCIA = Directly Connected Impervious Area (Acres)
I = 80% R = 0.77
ac-ft V(req) cf V(prop) cf Required Percent
WQV = 0.018 = 777 2400 NO 0%
Q = Runoff Depth (in watershed inches)
WQV WQV = Water Quality Volume (acre-feet)
DA DA = Drainage Area (acres)
Q(in) = 1.00 watershed inches
Q(in) = 1.00 watershed inches P = 1.3 in
CN = 96
Ia = 0.083 inches
Tc = 0.10 hours
Ia/P = 0.06
qu = 660 csm/in
WQF = Water Quality Flow (cfs)
WQF = (qu)(DA)(Q) qu = unit peak discharge (cfs/mi2/inch)
DA = drainage area (mi2)
Q(in) = runoff depth (watershed inches)
WQF = 0.221 cfs
WQV =
Q =
Calculate WQV
Compute Runoff Depth
2023 STORMWATER TREATMENT CALCULATIONS [PR-102 ROOF]
Compute Water Quality Volume
Determine Percent Impervious Cover (I) Calculate Volumetric Runoff Coefficient (R)
V(req) cf
0
V(prop) cf
N/A
Calculate Sediment Forebay Volume
Determine NCRS Curve Number (CN)
TR-55 Figure 2-1
TR-55 Exhibit 4-III
Compute Water Quality Flow
Determine Initial Abstraction (Ia)
TR-55 Table 4-1
Determine Unit Peak Discharge (qu)
Time of Concentration (Tc), referenced from Pipe Flow Calculation Worksheet
 6/26/26

Page 211

Page 212

Page 213

Return to Outlet Treatment Summary

Page 214

Yantic River Consultants, LLC Dorset Crossing Lot F
Simsbury, CT
WQV = Water Quality Volume (acre-feet)
P = 1.3" (90th percentile rainfall event)
(P)(R)(A) R = Volumetric Runoff Coefficient, 0.050 + 0.009(I)
12 I = Percent Impervious Cover, Impervious Area / Total Area DA = 1.140 acres
DA = Drainage Area (Acres) DCIA = 0.792 acres
DCIA = Directly Connected Impervious Area (Acres)
I = 69% R = 0.68
ac-ft V(req) cf V(prop) cf Required Percent
WQV = 0.083 = 3633 N/A NO 0%
Q = Runoff Depth (in watershed inches)
WQV WQV = Water Quality Volume (acre-feet)
DA DA = Drainage Area (acres)
Q(in) = 0.88 watershed inches
Q(in) = 0.88 watershed inches P = 1.3 in
CN = 98
Ia = 0.105 inches
Tc = 0.10 hours
Ia/P = 0.08
qu = 660 csm/in
WQF = Water Quality Flow (cfs)
WQF = (qu)(DA)(Q) qu = unit peak discharge (cfs/mi2/inch)
DA = drainage area (mi2)
Q(in) = runoff depth (watershed inches)
WQF = 1.032 cfs CONTECH STC 900 APPROVED TREATMENT RATE = 1.4 CFS
WQV =
Q =
Calculate WQV
Compute Runoff Depth
STORMWATER TREATMENT CALCULATIONS [PR-200 CONTECH STC 900]
Compute Water Quality Volume
Determine Percent Impervious Cover (I) Calculate Volumetric Runoff Coefficient (R)
V(req) cf
0
V(prop) cf
N/A
Calculate Sediment Forebay Volume
Determine NCRS Curve Number (CN)
TR-55 Figure 2-1
TR-55 Exhibit 4-III
Compute Water Quality Flow
Determine Initial Abstraction (Ia)
TR-55 Table 4-1
Determine Unit Peak Discharge (qu)
Time of Concentration (Tc), referenced from Pipe Flow Calculation Worksheet
 6/26/26

Page 215

Page 216

Page 217

Return to Outlet Treatment Summary

Page 218

Yantic River Consultants, LLC Dorset Crossing Lot F
Simsbury, CT
WQV = Water Quality Volume (acre-feet)
P = 1.3" (90th percentile rainfall event)
(P)(R)(A) R = Volumetric Runoff Coefficient, 0.050 + 0.009(I)
12 I = Percent Impervious Cover, Impervious Area / Total Area DA = 0.129 acres
DA = Drainage Area (Acres) DCIA = 0.105 acres
DCIA = Directly Connected Impervious Area (Acres)
I = 81% R = 0.78
ac-ft V(req) cf V(prop) cf Required Percent
WQV = 0.011 = 476 N/A NO 0%
Q = Runoff Depth (in watershed inches)
WQV WQV = Water Quality Volume (acre-feet)
DA DA = Drainage Area (acres)
Q(in) = 1.02 watershed inches
Q(in) = 1.02 watershed inches P = 1.3 in
CN = 96
Ia = 0.083 inches
Tc = 0.10 hours
Ia/P = 0.06
qu = 660 csm/in
WQF = Water Quality Flow (cfs)
WQF = (qu)(DA)(Q) qu = unit peak discharge (cfs/mi2/inch)
DA = drainage area (mi2)
Q(in) = runoff depth (watershed inches)
WQF = 0.135 cfs
WQV =
Q =
Calculate WQV
Compute Runoff Depth
STORMWATER TREATMENT CALCULATIONS [PR-F-102]
Compute Water Quality Volume
Determine Percent Impervious Cover (I) Calculate Volumetric Runoff Coefficient (R)
V(req) cf
0
V(prop) cf
N/A
Calculate Sediment Forebay Volume
Determine NCRS Curve Number (CN)
TR-55 Figure 2-1
TR-55 Exhibit 4-III
Compute Water Quality Flow
Determine Initial Abstraction (Ia)
TR-55 Table 4-1
Determine Unit Peak Discharge (qu)
Time of Concentration (Tc), referenced from Pipe Flow Calculation Worksheet
 6/26/26

Page 219

Page 220

Page 221

Return to Outlet Treatment Summary

Page 222

Yantic River Consultants, LLC Dorset Crossing Lot F
Simsbury, CT
WQV = Water Quality Volume (acre-feet)
P = 1.3" (90th percentile rainfall event)
(P)(R)(A) R = Volumetric Runoff Coefficient, 0.050 + 0.009(I)
12 I = Percent Impervious Cover, Impervious Area / Total Area DA = 0.177 acres
DA = Drainage Area (Acres) DCIA = 0.139 acres
DCIA = Directly Connected Impervious Area (Acres)
I = 79% R = 0.76
ac-ft V(req) cf V(prop) cf Required Percent
WQV = 0.015 = 632 N/A NO 0%
Q = Runoff Depth (in watershed inches)
WQV WQV = Water Quality Volume (acre-feet)
DA DA = Drainage Area (acres)
Q(in) = 0.98 watershed inches
Q(in) = 0.98 watershed inches P = 1.3 in
CN = 96
Ia = 0.083 inches
Tc = 0.10 hours
Ia/P = 0.06
qu = 660 csm/in
WQF = Water Quality Flow (cfs)
WQF = (qu)(DA)(Q) qu = unit peak discharge (cfs/mi2/inch)
DA = drainage area (mi2)
Q(in) = runoff depth (watershed inches)
WQF = 0.180 cfs
WQV =
Q =
Calculate WQV
Compute Runoff Depth
STORMWATER TREATMENT CALCULATIONS [PR-F-301]
Compute Water Quality Volume
Determine Percent Impervious Cover (I) Calculate Volumetric Runoff Coefficient (R)
V(req) cf
0
V(prop) cf
N/A
Calculate Sediment Forebay Volume
Determine NCRS Curve Number (CN)
TR-55 Figure 2-1
TR-55 Exhibit 4-III
Compute Water Quality Flow
Determine Initial Abstraction (Ia)
TR-55 Table 4-1
Determine Unit Peak Discharge (qu)
Time of Concentration (Tc), referenced from Pipe Flow Calculation Worksheet
 6/26/26

Page 223

Page 224

Page 225

Return to Outlet Treatment Summary

Page 226

Yantic River Consultants, LLC Dorset Crossing Lot F
Simsbury, CT
WQV = Water Quality Volume (acre-feet)
R = Volumetric Runoff Coefficient, 0.050 + 0.009(I)
I = Percent Impervious Cover, Impervious Area / Total Area
DA = Drainage Area (Acres) DA = 0.191 acres
IA = Impervious Area (Acres) IA = 0.144 acres
I = 75% R = 0.73
Calculate Water Quality Volume
WQV = 0.012 acre-feet Vsed = WQV x 0.10 N/A Vsed = N/A cf
Q = Runoff Depth (in watershed inches)
WQV = Water Quality Volume (acre-feet)
DA = Drainage Area (acres)
Q(in) = 0.73 watershed inches
Q(in) = 0.73 watershed inches P = 1 in
CN = 96
Ia = 0.083 inches
Tc = 0.10 hours
Ia/P = 0.083
qu = 660 csm/in
WQF = Water Quality Flow (cfs)
qu = unit peak discharge (cfs/mi2/inch)
DA = drainage area (mi2)
Q(in) = runoff depth (watershed inches)
WQF = 0.143 cfs
Determine NCRS Curve Number (CN)
From Appendix B, Figure 2-1 of the 2004 Connecticut Stormwater Manual
From Appendix B, Exhibit 4-111 of the 2004 Connecticut Stormwater Manual
Compute Water Quality Flow
Determine Initial Abstraction (Ia)
From Appendix B, Table 4-1 of the 2004 Connecticut Stormwater Manual
Determine Unit Peak Discharge (qu)
Time of Concentration (Tc), referenced from Pipe Flow Calculation Worksheet
Calculate Minimum Sediment Forebay Volume Sediment Forebay Proposed
Compute Runoff Depth
2004 SQM STORMWATER TREATMENT CALCULATIONS [EX-101]
Compute Water Quality Volume
Determine Percent Impervious Cover (I) Calculate Volumetric Runoff Coefficient (R)
12
)"1( ARWQ V ××=
DA
WQVQ in )12( )( ×=
)(inu QDAqWQF ××=
 6/29/26

Page 227

Page 228

Page 229

Return to Outlet Treatment Summary

Page 230

Yantic River Consultants, LLC Dorset Crossing Lot F
Simsbury, CT
WQV = Water Quality Volume (acre-feet)
P = 1.3" (90th percentile rainfall event)
(P)(R)(A) R = Volumetric Runoff Coefficient, 0.050 + 0.009(I)
12 I = Percent Impervious Cover, Impervious Area / Total Area DA = 0.138 acres
DA = Drainage Area (Acres) DCIA = 0.126 acres
DCIA = Directly Connected Impervious Area (Acres)
I = 91% R = 0.87
ac-ft V(req) cf V(prop) cf Required Percent
WQV = 0.013 = 568 N/A NO 0%
Q = Runoff Depth (in watershed inches)
WQV WQV = Water Quality Volume (acre-feet)
DA DA = Drainage Area (acres)
Q(in) = 1.13 watershed inches
Q(in) = 1.13 watershed inches P = 1.3 in
CN = 97
Ia = 0.062 inches
Tc = 0.10 hours
Ia/P = 0.05
qu = 660 csm/in
WQF = Water Quality Flow (cfs)
WQF = (qu)(DA)(Q) qu = unit peak discharge (cfs/mi2/inch)
DA = drainage area (mi2)
Q(in) = runoff depth (watershed inches)
WQF = 0.161 cfs
Determine NCRS Curve Number (CN)
TR-55 Figure 2-1
TR-55 Exhibit 4-III
Compute Water Quality Flow
Determine Initial Abstraction (Ia)
TR-55 Table 4-1
Determine Unit Peak Discharge (qu)
Time of Concentration (Tc), referenced from Pipe Flow Calculation Worksheet
WQV =
Q =
Calculate WQV
Compute Runoff Depth
2023 STORMWATER TREATMENT CALCULATIONS [EX-F-100]
Compute Water Quality Volume
Determine Percent Impervious Cover (I) Calculate Volumetric Runoff Coefficient (R)
V(req) cf
0
V(prop) cf
N/A
Calculate Sediment Forebay Volume
 6/26/26

Page 231

Page 232

Page 233

Return to Outlet Treatment Summary

Page 234

   DIAMOND SPARKLE CAR WASH 
 10 DORSET CROSSING
 SIMSBURY, CONNECTICUT 
 
  
 
 
 
APPENDIX D 
NRCS SOIL DATA 
NOAA RAINFALL DATA 

Page 235

Page 236

United States
Department of
Agriculture
A product of the National
Cooperative Soil Survey,
a joint effort of the United
States Department of
Agriculture and other
Federal agencies, State
agencies including the
Agricultural Experiment
Stations, and local
participants
Custom Soil Resource 
Report for
State of 
Connecticut, 
Western Part
DORSET CROSSING LOT F
Natural
Resources
Conservation
Service
June 25, 2026

Page 237

Preface
Soil surveys contain information that affects land use planning in survey areas. 
They highlight soil limitations that affect various land uses and provide information 
about the properties of the soils in the survey areas. Soil surveys are designed for 
many different users, including farmers, ranchers, foresters, agronomists, urban 
planners, community officials, engineers, developers, builders, and home buyers. 
Also, conservationists, teachers, students, and specialists in recreation, waste 
disposal, and pollution control can use the surveys to help them understand, 
protect, or enhance the environment.
Various land use regulations of Federal, State, and local governments may impose 
special restrictions on land use or land treatment. Soil surveys identify soil 
properties that are used in making various land use or land treatment decisions. 
The information is intended to help the land users identify and reduce the effects of 
soil limitations on various land uses. The landowner or user is responsible for 
identifying and complying with existing laws and regulations.
Although soil survey information can be used for general farm, local, and wider area 
planning, onsite investigation is needed to supplement this information in some 
cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/
portal/nrcs/main/soils/health/) and certain conservation and engineering 
applications. For more detailed information, contact your local USDA Service Center 
(https://offices.sc.egov.usda.gov/locator/app?agency=nrcs) or your NRCS State Soil 
Scientist (http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/contactus/?
cid=nrcs142p2_053951).
Great differences in soil properties can occur within short distances. Some soils are 
seasonally wet or subject to flooding. Some are too unstable to be used as a 
foundation for buildings or roads. Clayey or wet soils are poorly suited to use as 
septic tank absorption fields. A high water table makes a soil poorly suited to 
basements or underground installations.
The National Cooperative Soil Survey is a joint effort of the United States 
Department of Agriculture and other Federal agencies, State agencies including the 
Agricultural Experiment Stations, and local agencies. The Natural Resources 
Conservation Service (NRCS) has leadership for the Federal part of the National 
Cooperative Soil Survey.
Information about soils is updated periodically. Updated information is available 
through the NRCS Web Soil Survey, the site for official soil survey information.
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its 
programs and activities on the basis of race, color, national origin, age, disability, 
and where applicable, sex, marital status, familial status, parental status, religion, 
sexual orientation, genetic information, political beliefs, reprisal, or because all or a 
part of an individual's income is derived from any public assistance program. (Not 
all prohibited bases apply to all programs.) Persons with disabilities who require 
2

Page 238

alternative means for communication of program information (Braille, large print, 
audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice 
and TDD). To file a complaint of discrimination, write to USDA, Director, Office of 
Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or 
call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity 
provider and employer.
3

Page 239

Contents
Preface.................................................................................................................... 2
How Soil Surveys Are Made..................................................................................5
Soil Map.................................................................................................................. 8
Soil Map................................................................................................................9
Legend................................................................................................................10
Map Unit Legend................................................................................................ 11
Map Unit Descriptions.........................................................................................11
State of Connecticut, Western Part.................................................................13
18—Catden and Freetown soils, 0 to 2 percent slopes...............................13
34A—Merrimac fine sandy loam, 0 to 3 percent slopes..............................15
34B—Merrimac fine sandy loam, 3 to 8 percent slopes..............................17
38C—Hinckley loamy sand, 3 to 15 percent slopes....................................19
38E—Hinckley loamy sand, 15 to 45 percent slopes..................................21
305—Udorthents-Pits complex, gravelly..................................................... 23
307—Urban land......................................................................................... 25
308—Udorthents, smoothed....................................................................... 26
Soil Information for All Uses...............................................................................28
Soil Properties and Qualities.............................................................................. 28
Soil Physical Properties.................................................................................. 28
Saturated Hydraulic Conductivity (Ksat), Standard Classes....................... 28
Soil Qualities and Features.............................................................................32
Hydrologic Soil Group................................................................................. 33
References............................................................................................................37
4

Page 240

How Soil Surveys Are Made
Soil surveys are made to provide information about the soils and miscellaneous 
areas in a specific area. They include a description of the soils and miscellaneous 
areas and their location on the landscape and tables that show soil properties and 
limitations affecting various uses. Soil scientists observed the steepness, length, 
and shape of the slopes; the general pattern of drainage; the kinds of crops and 
native plants; and the kinds of bedrock. They observed and described many soil 
profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The 
profile extends from the surface down into the unconsolidated material in which the 
soil formed or from the surface down to bedrock. The unconsolidated material is 
devoid of roots and other living organisms and has not been changed by other 
biological activity.
Currently, soils are mapped according to the boundaries of major land resource 
areas (MLRAs). MLRAs are geographically associated land resource units that 
share common characteristics related to physiography, geology, climate, water 
resources, soils, biological resources, and land uses (USDA, 2006). Soil survey 
areas typically consist of parts of one or more MLRA.
The soils and miscellaneous areas in a survey area occur in an orderly pattern that 
is related to the geology, landforms, relief, climate, and natural vegetation of the 
area. Each kind of soil and miscellaneous area is associated with a particular kind 
of landform or with a segment of the landform. By observing the soils and 
miscellaneous areas in the survey area and relating their position to specific 
segments of the landform, a soil scientist develops a concept, or model, of how they 
were formed. Thus, during mapping, this model enables the soil scientist to predict 
with a considerable degree of accuracy the kind of soil or miscellaneous area at a 
specific location on the landscape.
Commonly, individual soils on the landscape merge into one another as their 
characteristics gradually change. To construct an accurate soil map, however, soil 
scientists must determine the boundaries between the soils. They can observe only 
a limited number of soil profiles. Nevertheless, these observations, supplemented 
by an understanding of the soil-vegetation-landscape relationship, are sufficient to 
verify predictions of the kinds of soil in an area and to determine the boundaries.
Soil scientists recorded the characteristics of the soil profiles that they studied. They 
noted soil color, texture, size and shape of soil aggregates, kind and amount of rock 
fragments, distribution of plant roots, reaction, and other features that enable them 
to identify soils. After describing the soils in the survey area and determining their 
properties, the soil scientists assigned the soils to taxonomic classes (units). 
Taxonomic classes are concepts. Each taxonomic class has a set of soil 
characteristics with precisely defined limits. The classes are used as a basis for 
comparison to classify soils systematically. Soil taxonomy, the system of taxonomic 
classification used in the United States, is based mainly on the kind and character 
of soil properties and the arrangement of horizons within the profile. After the soil 
5

Page 241

scientists classified and named the soils in the survey area, they compared the 
individual soils with similar soils in the same taxonomic class in other areas so that 
they could confirm data and assemble additional data based on experience and 
research.
The objective of soil mapping is not to delineate pure map unit components; the 
objective is to separate the landscape into landforms or landform segments that 
have similar use and management requirements. Each map unit is defined by a 
unique combination of soil components and/or miscellaneous areas in predictable 
proportions. Some components may be highly contrasting to the other components 
of the map unit. The presence of minor components in a map unit in no way 
diminishes the usefulness or accuracy of the data. The delineation of such 
landforms and landform segments on the map provides sufficient information for the 
development of resource plans. If intensive use of small areas is planned, onsite 
investigation is needed to define and locate the soils and miscellaneous areas.
Soil scientists make many field observations in the process of producing a soil map. 
The frequency of observation is dependent upon several factors, including scale of 
mapping, intensity of mapping, design of map units, complexity of the landscape, 
and experience of the soil scientist. Observations are made to test and refine the 
soil-landscape model and predictions and to verify the classification of the soils at 
specific locations. Once the soil-landscape model is refined, a significantly smaller 
number of measurements of individual soil properties are made and recorded. 
These measurements may include field measurements, such as those for color, 
depth to bedrock, and texture, and laboratory measurements, such as those for 
content of sand, silt, clay, salt, and other components. Properties of each soil 
typically vary from one point to another across the landscape.
Observations for map unit components are aggregated to develop ranges of 
characteristics for the components. The aggregated values are presented. Direct 
measurements do not exist for every property presented for every map unit 
component. Values for some properties are estimated from combinations of other 
properties.
While a soil survey is in progress, samples of some of the soils in the area generally 
are collected for laboratory analyses and for engineering tests. Soil scientists 
interpret the data from these analyses and tests as well as the field-observed 
characteristics and the soil properties to determine the expected behavior of the 
soils under different uses. Interpretations for all of the soils are field tested through 
observation of the soils in different uses and under different levels of management. 
Some interpretations are modified to fit local conditions, and some new 
interpretations are developed to meet local needs. Data are assembled from other 
sources, such as research information, production records, and field experience of 
specialists. For example, data on crop yields under defined levels of management 
are assembled from farm records and from field or plot experiments on the same 
kinds of soil.
Predictions about soil behavior are based not only on soil properties but also on 
such variables as climate and biological activity. Soil conditions are predictable over 
long periods of time, but they are not predictable from year to year. For example, 
soil scientists can predict with a fairly high degree of accuracy that a given soil will 
have a high water table within certain depths in most years, but they cannot predict 
that a high water table will always be at a specific level in the soil on a specific date.
After soil scientists located and identified the significant natural bodies of soil in the 
survey area, they drew the boundaries of these bodies on aerial photographs and 
Custom Soil Resource Report
6

Page 242

identified each as a specific map unit. Aerial photographs show trees, buildings, 
fields, roads, and rivers, all of which help in locating boundaries accurately.
Custom Soil Resource Report
7

Page 243

Soil Map
The soil map section includes the soil map for the defined area of interest, a list of 
soil map units on the map and extent of each map unit, and cartographic symbols 
displayed on the map. Also presented are various metadata about data used to 
produce the map, and a description of each soil map unit.
8

Page 244

9
Custom Soil Resource Report
Soil Map
4641730 4641790 4641850 4641910 4641970 4642030 4642090
4641730 4641790 4641850 4641910 4641970 4642030 4642090
683070 683130 683190 683250 683310 683370 683430 683490 683550 683610 683670
683070 683130 683190 683250 683310 683370 683430 683490 683550 683610 683670
41°  54' 35'' N
72°  47' 34'' W
41°  54' 35'' N
72°  47' 6'' W
41°  54' 21'' N
72°  47' 34'' W
41°  54' 21'' N
72°  47' 6'' WN
Map projection: Web Mercator   Corner coordinates: WGS84   Edge tics: UTM Zone 18N WGS84
0 100 200 400 600
Feet
0 40 80 160 240
Meters
Map Scale: 1:2,940 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.

Page 245

MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at 
1:12,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause 
misunderstanding of the detail of mapping and accuracy of soil 
line placement. The maps do not show the small areas of 
contrasting soils that could have been shown at a more detailed 
scale.
Please rely on the bar scale on each map sheet for map 
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL: 
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator 
projection, which preserves direction and shape but distorts 
distance and area. A projection that preserves area, such as the 
Albers equal-area conic projection, should be used if more 
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as 
of the version date(s) listed below.
Soil Survey Area: State of Connecticut, Western Part
Survey Area Data: Version 6, Sep 16, 2025
Soil map units are labeled (as space allows) for map scales 
1:50,000 or larger.
Date(s) aerial images were photographed: Mar 1, 2024—Jul 1, 
2024
The orthophoto or other base map on which the soil lines were 
compiled and digitized probably differs from the background 
imagery displayed on these maps. As a result, some minor 
shifting of map unit boundaries may be evident.
Custom Soil Resource Report
10

Page 246

Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
18 Catden and Freetown soils, 0 to 
2 percent slopes
2.0 5.5%
34A Merrimac fine sandy loam, 0 to 
3 percent slopes
1.5 4.0%
34B Merrimac fine sandy loam, 3 to 
8 percent slopes
2.9 7.9%
38C Hinckley loamy sand, 3 to 15 
percent slopes
21.0 57.9%
38E Hinckley loamy sand, 15 to 45 
percent slopes
0.5 1.2%
305 Udorthents-Pits complex, 
gravelly
5.8 16.1%
307 Urban land 0.0 0.1%
308 Udorthents, smoothed 2.6 7.2%
Totals for Area of Interest 36.2 100.0%
Map Unit Descriptions
The map units delineated on the detailed soil maps in a soil survey represent the 
soils or miscellaneous areas in the survey area. The map unit descriptions, along 
with the maps, can be used to determine the composition and properties of a unit.
A map unit delineation on a soil map represents an area dominated by one or more 
major kinds of soil or miscellaneous areas. A map unit is identified and named 
according to the taxonomic classification of the dominant soils. Within a taxonomic 
class there are precisely defined limits for the properties of the soils. On the 
landscape, however, the soils are natural phenomena, and they have the 
characteristic variability of all natural phenomena. Thus, the range of some 
observed properties may extend beyond the limits defined for a taxonomic class. 
Areas of soils of a single taxonomic class rarely, if ever, can be mapped without 
including areas of other taxonomic classes. Consequently, every map unit is made 
up of the soils or miscellaneous areas for which it is named and some minor 
components that belong to taxonomic classes other than those of the major soils.
Most minor soils have properties similar to those of the dominant soil or soils in the 
map unit, and thus they do not affect use and management. These are called 
noncontrasting, or similar, components. They may or may not be mentioned in a 
particular map unit description. Other minor components, however, have properties 
and behavioral characteristics divergent enough to affect use or to require different 
management. These are called contrasting, or dissimilar, components. They 
generally are in small areas and could not be mapped separately because of the 
scale used. Some small areas of strongly contrasting soils or miscellaneous areas 
are identified by a special symbol on the maps. If included in the database for a 
given area, the contrasting minor components are identified in the map unit 
Custom Soil Resource Report
11

Page 247

descriptions along with some characteristics of each. A few areas of minor 
components may not have been observed, and consequently they are not 
mentioned in the descriptions, especially where the pattern was so complex that it 
was impractical to make enough observations to identify all the soils and 
miscellaneous areas on the landscape.
The presence of minor components in a map unit in no way diminishes the 
usefulness or accuracy of the data. The objective of mapping is not to delineate 
pure taxonomic classes but rather to separate the landscape into landforms or 
landform segments that have similar use and management requirements. The 
delineation of such segments on the map provides sufficient information for the 
development of resource plans. If intensive use of small areas is planned, however, 
onsite investigation is needed to define and locate the soils and miscellaneous 
areas.
An identifying symbol precedes the map unit name in the map unit descriptions. 
Each description includes general facts about the unit and gives important soil 
properties and qualities.
Soils that have profiles that are almost alike make up a soil series. Except for 
differences in texture of the surface layer, all the soils of a series have major 
horizons that are similar in composition, thickness, and arrangement.
Soils of one series can differ in texture of the surface layer, slope, stoniness, 
salinity, degree of erosion, and other characteristics that affect their use. On the 
basis of such differences, a soil series is divided into soil phases. Most of the areas 
shown on the detailed soil maps are phases of soil series. The name of a soil phase 
commonly indicates a feature that affects use or management. For example, Alpha 
silt loam, 0 to 2 percent slopes, is a phase of the Alpha series.
Some map units are made up of two or more major soils or miscellaneous areas. 
These map units are complexes, associations, or undifferentiated groups.
A complex consists of two or more soils or miscellaneous areas in such an intricate 
pattern or in such small areas that they cannot be shown separately on the maps. 
The pattern and proportion of the soils or miscellaneous areas are somewhat similar 
in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example.
An association is made up of two or more geographically associated soils or 
miscellaneous areas that are shown as one unit on the maps. Because of present 
or anticipated uses of the map units in the survey area, it was not considered 
practical or necessary to map the soils or miscellaneous areas separately. The 
pattern and relative proportion of the soils or miscellaneous areas are somewhat 
similar. Alpha-Beta association, 0 to 2 percent slopes, is an example.
An undifferentiated group is made up of two or more soils or miscellaneous areas 
that could be mapped individually but are mapped as one unit because similar 
interpretations can be made for use and management. The pattern and proportion 
of the soils or miscellaneous areas in a mapped area are not uniform. An area can 
be made up of only one of the major soils or miscellaneous areas, or it can be made 
up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example.
Some surveys include miscellaneous areas. Such areas have little or no soil 
material and support little or no vegetation. Rock outcrop is an example.
Custom Soil Resource Report
12

Page 248

State of Connecticut, Western Part
18—Catden and Freetown soils, 0 to 2 percent slopes
Map Unit Setting
National map unit symbol: 2t2r2
Landscape: Lake plains, outwash plains, till plains
Elevation: 0 to 1,390 feet
Mean annual precipitation: 36 to 71 inches
Mean annual air temperature: 39 to 55 degrees F
Frost-free period: 140 to 240 days
Farmland classification: Not prime farmland
Map Unit Composition
Catden and similar soils: 45 percent
Freetown and similar soils: 35 percent
Minor components: 20 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Catden
Setting
Landscape: Lake plains, outwash plains, till plains
Landform: Depressions, Bogs, Fens, Depressions, Depressions, Kettles, 
Marshes, Swamps
Landform position (three-dimensional): Base slope, tread
Down-slope shape: Concave
Across-slope shape: Concave
Parent material: Highly decomposed herbaceous organic material and/or highly 
decomposed woody organic material
Typical profile
Oa1 - 0 to 2 inches: muck
Oa2 - 2 to 79 inches: muck
Properties and qualities
Slope: 0 to 2 percent
Surface area covered with cobbles, stones or boulders: 0.0 percent
Depth to restrictive feature: More than 80 inches
Drainage class: Very poorly drained
Runoff class: Negligible
Capacity of the most limiting layer to transmit water (Ksat): Moderately low to high 
(0.14 to 14.17 in/hr)
Depth to water table: About 0 to 6 inches
Frequency of flooding: Rare
Frequency of ponding: Frequent
Maximum salinity: Nonsaline (0.0 to 1.9 mmhos/cm)
Available water supply, 0 to 60 inches: Very high (about 26.9 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 5w
Hydrologic Soil Group: B/D
Ecological site: F144AY042NY - Semi-Rich Organic Wetlands
Hydric soil rating: Yes
Custom Soil Resource Report
13

Page 249

Description of Freetown
Setting
Landscape: Alluvial plains, outwash plains, uplands
Landform: Depressions, Marshes, Depressions, Bogs, Swamps, Kettles
Landform position (three-dimensional): Tread, dip
Down-slope shape: Concave
Across-slope shape: Concave
Parent material: Highly decomposed organic material
Typical profile
Oe - 0 to 2 inches: mucky peat
Oa - 2 to 79 inches: muck
Properties and qualities
Slope: 0 to 2 percent
Surface area covered with cobbles, stones or boulders: 0.0 percent
Depth to restrictive feature: More than 80 inches
Drainage class: Very poorly drained
Runoff class: Negligible
Capacity of the most limiting layer to transmit water (Ksat): Moderately low to high 
(0.14 to 14.17 in/hr)
Depth to water table: About 0 to 6 inches
Frequency of flooding: Rare
Frequency of ponding: Frequent
Available water supply, 0 to 60 inches: Very high (about 26.9 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 5w
Hydrologic Soil Group: B/D
Ecological site: F144AY043MA - Acidic Organic Wetlands
Hydric soil rating: Yes
Minor Components
Natchaug
Percent of map unit: 7 percent
Landscape: Lake plains, till plains, outwash plains
Landform: Depressions, Depressions, Depressions
Landform position (three-dimensional): Base slope, tread
Down-slope shape: Concave
Across-slope shape: Concave
Hydric soil rating: Yes
Whitman
Percent of map unit: 6 percent
Landscape: Uplands
Landform: Drainageways, Depressions
Landform position (three-dimensional): Base slope
Down-slope shape: Concave
Across-slope shape: Concave
Hydric soil rating: Yes
Timakwa
Percent of map unit: 5 percent
Landscape: Outwash plains
Custom Soil Resource Report
14

Page 250

Landform: Depressions
Landform position (three-dimensional): Base slope
Down-slope shape: Concave
Across-slope shape: Concave
Hydric soil rating: Yes
Scarboro
Percent of map unit: 2 percent
Landscape: Valleys, outwash plains
Landform: Depressions, Drainageways, Outwash deltas, Outwash terraces
Landform position (three-dimensional): Base slope, tread, dip
Down-slope shape: Concave
Across-slope shape: Concave, linear
Hydric soil rating: Yes
34A—Merrimac fine sandy loam, 0 to 3 percent slopes
Map Unit Setting
National map unit symbol: 2tyqr
Landscape: Outwash plains, valleys
Elevation: 0 to 1,100 feet
Mean annual precipitation: 36 to 71 inches
Mean annual air temperature: 39 to 55 degrees F
Frost-free period: 140 to 240 days
Farmland classification: All areas are prime farmland
Map Unit Composition
Merrimac and similar soils: 86 percent
Minor components: 14 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Merrimac
Setting
Landscape: Outwash plains, valleys
Landform: Outwash plains, Outwash terraces, Moraines, Eskers, Kames
Landform position (two-dimensional): Summit, shoulder, backslope, footslope
Landform position (three-dimensional): Side slope, crest, riser, tread
Down-slope shape: Convex
Across-slope shape: Convex
Parent material: Loamy glaciofluvial deposits derived from granite, schist, and 
gneiss over sandy and gravelly glaciofluvial deposits derived from granite, 
schist, and gneiss
Typical profile
Ap - 0 to 10 inches: fine sandy loam
Bw1 - 10 to 22 inches: fine sandy loam
Bw2 - 22 to 26 inches: stratified gravel to gravelly loamy sand
2C - 26 to 65 inches: stratified gravel to very gravelly sand
Custom Soil Resource Report
15

Page 251

Properties and qualities
Slope: 0 to 3 percent
Depth to restrictive feature: More than 80 inches
Drainage class: Somewhat excessively drained
Runoff class: Very low
Capacity of the most limiting layer to transmit water (Ksat): Moderately high to 
very high (1.42 to 99.90 in/hr)
Depth to water table: More than 80 inches
Frequency of flooding: None
Frequency of ponding: None
Calcium carbonate, maximum content: 2 percent
Maximum salinity: Nonsaline (0.0 to 1.4 mmhos/cm)
Sodium adsorption ratio, maximum: 1.0
Available water supply, 0 to 60 inches: Low (about 4.6 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 1
Hydrologic Soil Group: A
Ecological site: F145XY008MA - Dry Outwash
Hydric soil rating: No
Minor Components
Sudbury
Percent of map unit: 5 percent
Landscape: Lake plains, valleys
Landform: Deltas, Terraces, Outwash plains
Landform position (two-dimensional): Footslope
Landform position (three-dimensional): Tread, dip
Down-slope shape: Concave
Across-slope shape: Linear
Hydric soil rating: No
Hinckley
Percent of map unit: 5 percent
Landscape: Outwash plains, valleys
Landform: Deltas, Kames, Eskers, Outwash plains
Landform position (two-dimensional): Summit, shoulder, backslope
Landform position (three-dimensional): Head slope, nose slope, side slope, crest, 
rise
Down-slope shape: Convex
Across-slope shape: Convex, linear
Hydric soil rating: No
Windsor
Percent of map unit: 3 percent
Landscape: Valleys
Landform: Dunes, Deltas, Outwash terraces, Outwash plains
Landform position (two-dimensional): Summit
Landform position (three-dimensional): Tread, riser
Down-slope shape: Convex, linear
Across-slope shape: Convex, linear
Hydric soil rating: No
Custom Soil Resource Report
16

Page 252

Walpole
Percent of map unit: 1 percent
Landscape: Outwash plains
Landform: Depressions
Landform position (three-dimensional): Tread
Down-slope shape: Concave
Across-slope shape: Concave
Ecological site: F144AY028MA - Wet Outwash
Hydric soil rating: Yes
34B—Merrimac fine sandy loam, 3 to 8 percent slopes
Map Unit Setting
National map unit symbol: 2tyqs
Landscape: Outwash plains, valleys
Elevation: 0 to 1,290 feet
Mean annual precipitation: 36 to 71 inches
Mean annual air temperature: 39 to 55 degrees F
Frost-free period: 140 to 240 days
Farmland classification: All areas are prime farmland
Map Unit Composition
Merrimac and similar soils: 86 percent
Minor components: 14 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Merrimac
Setting
Landscape: Outwash plains, valleys
Landform: Outwash plains, Outwash terraces, Moraines, Eskers, Kames
Landform position (two-dimensional): Summit, shoulder, backslope, footslope
Landform position (three-dimensional): Side slope, crest, riser, tread
Down-slope shape: Convex
Across-slope shape: Convex
Parent material: Loamy glaciofluvial deposits derived from granite, schist, and 
gneiss over sandy and gravelly glaciofluvial deposits derived from granite, 
schist, and gneiss
Typical profile
Ap - 0 to 10 inches: fine sandy loam
Bw1 - 10 to 22 inches: fine sandy loam
Bw2 - 22 to 26 inches: stratified gravel to gravelly loamy sand
2C - 26 to 65 inches: stratified gravel to very gravelly sand
Properties and qualities
Slope: 3 to 8 percent
Depth to restrictive feature: More than 80 inches
Drainage class: Somewhat excessively drained
Runoff class: Very low
Custom Soil Resource Report
17

Page 253

Capacity of the most limiting layer to transmit water (Ksat): Moderately high to 
very high (1.42 to 99.90 in/hr)
Depth to water table: More than 80 inches
Frequency of flooding: None
Frequency of ponding: None
Calcium carbonate, maximum content: 2 percent
Maximum salinity: Nonsaline (0.0 to 1.4 mmhos/cm)
Sodium adsorption ratio, maximum: 1.0
Available water supply, 0 to 60 inches: Low (about 4.6 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 2s
Hydrologic Soil Group: A
Ecological site: F145XY008MA - Dry Outwash
Hydric soil rating: No
Minor Components
Sudbury
Percent of map unit: 5 percent
Landscape: Lake plains, valleys
Landform: Deltas, Terraces, Outwash plains
Landform position (two-dimensional): Footslope
Landform position (three-dimensional): Tread, dip
Down-slope shape: Concave
Across-slope shape: Linear
Hydric soil rating: No
Hinckley
Percent of map unit: 5 percent
Landscape: Outwash plains, valleys
Landform: Deltas, Kames, Eskers, Outwash plains
Landform position (two-dimensional): Summit, shoulder, backslope
Landform position (three-dimensional): Head slope, nose slope, side slope, crest, 
rise
Down-slope shape: Convex
Across-slope shape: Convex, linear
Hydric soil rating: No
Windsor
Percent of map unit: 3 percent
Landscape: Valleys
Landform: Dunes, Deltas, Outwash terraces, Outwash plains
Landform position (two-dimensional): Summit
Landform position (three-dimensional): Tread, riser
Down-slope shape: Convex, linear
Across-slope shape: Convex, linear
Hydric soil rating: No
Walpole
Percent of map unit: 1 percent
Landscape: Outwash plains
Landform: Depressions
Landform position (three-dimensional): Tread
Down-slope shape: Concave
Across-slope shape: Concave
Custom Soil Resource Report
18

Page 254

Ecological site: F144AY028MA - Wet Outwash
Hydric soil rating: Yes
38C—Hinckley loamy sand, 3 to 15 percent slopes
Map Unit Setting
National map unit symbol: 2svmb
Landscape: Uplands, valleys
Elevation: 0 to 1,290 feet
Mean annual precipitation: 36 to 71 inches
Mean annual air temperature: 39 to 55 degrees F
Frost-free period: 140 to 240 days
Farmland classification: Farmland of statewide importance
Map Unit Composition
Hinckley and similar soils: 85 percent
Minor components: 15 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Hinckley
Setting
Landscape: Uplands, valleys
Landform: Outwash deltas, Outwash terraces, Moraines, Eskers, Kames, 
Outwash plains, Kame terraces
Landform position (two-dimensional): Summit, shoulder, backslope, footslope, 
toeslope
Landform position (three-dimensional): Head slope, nose slope, side slope, crest, 
riser, tread
Down-slope shape: Concave, convex, linear
Across-slope shape: Convex, linear, concave
Parent material: Sandy and gravelly glaciofluvial deposits derived from gneiss 
and/or granite and/or schist
Typical profile
Oe - 0 to 1 inches: moderately decomposed plant material
A - 1 to 8 inches: loamy sand
Bw1 - 8 to 11 inches: gravelly loamy sand
Bw2 - 11 to 16 inches: gravelly loamy sand
BC - 16 to 19 inches: very gravelly loamy sand
C - 19 to 65 inches: very gravelly sand
Properties and qualities
Slope: 3 to 15 percent
Depth to restrictive feature: More than 80 inches
Drainage class: Excessively drained
Runoff class: Very low
Capacity of the most limiting layer to transmit water (Ksat): Moderately high to 
very high (1.42 to 99.90 in/hr)
Depth to water table: More than 80 inches
Custom Soil Resource Report
19

Page 255

Frequency of flooding: None
Frequency of ponding: None
Maximum salinity: Nonsaline (0.0 to 1.9 mmhos/cm)
Available water supply, 0 to 60 inches: Low (about 3.1 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 4e
Hydrologic Soil Group: A
Ecological site: F144AY022MA - Dry Outwash
Hydric soil rating: No
Minor Components
Windsor
Percent of map unit: 5 percent
Landscape: Uplands, valleys
Landform: Moraines, Eskers, Kames, Outwash deltas, Outwash terraces, 
Outwash plains, Kame terraces
Landform position (two-dimensional): Summit, shoulder, backslope, footslope, 
toeslope
Landform position (three-dimensional): Head slope, nose slope, side slope, crest, 
riser, tread
Down-slope shape: Concave, convex, linear
Across-slope shape: Convex, linear, concave
Hydric soil rating: No
Merrimac
Percent of map unit: 5 percent
Landscape: Valleys, outwash plains
Landform: Kames, Outwash plains, Outwash terraces, Moraines, Eskers
Landform position (two-dimensional): Summit, shoulder, backslope, footslope, 
toeslope
Landform position (three-dimensional): Head slope, nose slope, side slope, crest, 
riser, tread
Down-slope shape: Convex
Across-slope shape: Convex
Hydric soil rating: No
Agawam
Percent of map unit: 3 percent
Landscape: Uplands, valleys
Landform: Eskers, Kames, Outwash plains, Kame terraces, Outwash deltas, 
Outwash terraces, Moraines
Landform position (two-dimensional): Summit, shoulder, backslope, toeslope, 
footslope
Landform position (three-dimensional): Head slope, nose slope, side slope, crest, 
riser, tread
Down-slope shape: Concave, convex, linear
Across-slope shape: Convex, linear, concave
Hydric soil rating: No
Sudbury
Percent of map unit: 2 percent
Landscape: Valleys, uplands
Landform: Outwash deltas, Moraines, Outwash plains, Kame terraces, Outwash 
terraces
Custom Soil Resource Report
20

Page 256

Landform position (two-dimensional): Backslope, footslope
Landform position (three-dimensional): Base slope, tread
Down-slope shape: Concave, linear
Across-slope shape: Concave, linear
Hydric soil rating: No
38E—Hinckley loamy sand, 15 to 45 percent slopes
Map Unit Setting
National map unit symbol: 2svmj
Landscape: Uplands, valleys
Elevation: 0 to 1,280 feet
Mean annual precipitation: 36 to 71 inches
Mean annual air temperature: 39 to 55 degrees F
Frost-free period: 140 to 240 days
Farmland classification: Not prime farmland
Map Unit Composition
Hinckley and similar soils: 85 percent
Minor components: 15 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Hinckley
Setting
Landscape: Uplands, valleys
Landform: Eskers, Kames, Outwash deltas, Outwash terraces, Moraines, 
Outwash plains, Kame terraces
Landform position (two-dimensional): Backslope
Landform position (three-dimensional): Head slope, nose slope, side slope, crest, 
riser
Down-slope shape: Concave, convex, linear
Across-slope shape: Convex, linear, concave
Parent material: Sandy and gravelly glaciofluvial deposits derived from gneiss 
and/or granite and/or schist
Typical profile
Oe - 0 to 1 inches: moderately decomposed plant material
A - 1 to 8 inches: loamy sand
Bw1 - 8 to 11 inches: gravelly loamy sand
Bw2 - 11 to 16 inches: gravelly loamy sand
BC - 16 to 19 inches: very gravelly loamy sand
C - 19 to 65 inches: very gravelly sand
Properties and qualities
Slope: 15 to 45 percent
Depth to restrictive feature: More than 80 inches
Drainage class: Excessively drained
Runoff class: Low
Custom Soil Resource Report
21

Page 257

Capacity of the most limiting layer to transmit water (Ksat): Moderately high to 
very high (1.42 to 99.90 in/hr)
Depth to water table: More than 80 inches
Frequency of flooding: None
Frequency of ponding: None
Maximum salinity: Nonsaline (0.0 to 1.9 mmhos/cm)
Available water supply, 0 to 60 inches: Low (about 3.1 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 7e
Hydrologic Soil Group: A
Ecological site: F144AY022MA - Dry Outwash
Hydric soil rating: No
Minor Components
Windsor
Percent of map unit: 5 percent
Landscape: Uplands, valleys
Landform: Eskers, Kames, Moraines, Outwash deltas, Outwash terraces, 
Outwash plains, Kame terraces
Landform position (two-dimensional): Backslope
Landform position (three-dimensional): Head slope, nose slope, side slope, crest, 
riser
Down-slope shape: Concave, convex, linear
Across-slope shape: Convex, linear, concave
Hydric soil rating: No
Merrimac
Percent of map unit: 5 percent
Landscape: Valleys, outwash plains
Landform: Outwash plains, Outwash terraces, Moraines, Eskers, Kames
Landform position (two-dimensional): Backslope
Landform position (three-dimensional): Head slope, nose slope, side slope, crest, 
riser
Down-slope shape: Convex
Across-slope shape: Convex
Hydric soil rating: No
Agawam
Percent of map unit: 3 percent
Landscape: Uplands, valleys
Landform: Eskers, Kame terraces, Outwash deltas, Outwash terraces, Moraines, 
Kames, Outwash plains
Landform position (two-dimensional): Backslope
Landform position (three-dimensional): Head slope, nose slope, side slope, crest, 
riser
Down-slope shape: Concave, convex, linear
Across-slope shape: Convex, linear, concave
Hydric soil rating: No
Sudbury
Percent of map unit: 2 percent
Landscape: Valleys, uplands
Landform: Kames, Eskers, Outwash deltas, Outwash plains, Kame terraces, 
Outwash terraces, Moraines
Custom Soil Resource Report
22

Page 258

Landform position (two-dimensional): Backslope, footslope
Landform position (three-dimensional): Base slope, tread
Down-slope shape: Concave, linear
Across-slope shape: Linear, concave
Hydric soil rating: No
305—Udorthents-Pits complex, gravelly
Map Unit Setting
National map unit symbol: 9lmf
Elevation: 0 to 2,000 feet
Mean annual precipitation: 43 to 54 inches
Mean annual air temperature: 45 to 55 degrees F
Frost-free period: 120 to 185 days
Farmland classification: Not prime farmland
Map Unit Composition
Udorthents and similar soils: 65 percent
Pits: 25 percent
Minor components: 10 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Udorthents
Setting
Anthropogenic Feature: Sand pits, gravel pits
Down-slope shape: Convex
Across-slope shape: Linear
Parent material: Gravelly outwash
Typical profile
A - 0 to 5 inches: loam
C1 - 5 to 21 inches: gravelly loam
C2 - 21 to 80 inches: very gravelly sandy loam
Properties and qualities
Slope: 0 to 35 percent
Depth to restrictive feature: More than 80 inches
Drainage class: Moderately well drained
Runoff class: Medium
Capacity of the most limiting layer to transmit water (Ksat): Very low to high (0.00 
to 1.98 in/hr)
Depth to water table: About 24 to 54 inches
Frequency of flooding: None
Frequency of ponding: None
Available water supply, 0 to 60 inches: Moderate (about 6.8 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 4e
Hydrologic Soil Group: C
Custom Soil Resource Report
23

Page 259

Hydric soil rating: No
Description of Pits
Typical profile
C - 0 to 65 inches: very gravelly sand
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 8
Hydric soil rating: Unranked
Minor Components
Hinckley
Percent of map unit: 2 percent
Landscape: Valleys
Landform: Terraces, Outwash plains, Kames, Eskers
Down-slope shape: Convex
Across-slope shape: Convex
Hydric soil rating: No
Windsor
Percent of map unit: 2 percent
Landscape: Valleys
Landform: Terraces, Outwash plains, Kames
Down-slope shape: Convex
Across-slope shape: Convex
Hydric soil rating: No
Merrimac
Percent of map unit: 2 percent
Landscape: Valleys
Landform: Terraces, Outwash plains, Kames
Down-slope shape: Linear
Across-slope shape: Linear
Hydric soil rating: No
Gloucester
Percent of map unit: 2 percent
Landscape: Uplands
Landform: Hills
Down-slope shape: Convex
Across-slope shape: Convex
Hydric soil rating: No
Ninigret
Percent of map unit: 1 percent
Landscape: Valleys
Landform: Terraces, Outwash plains
Down-slope shape: Linear
Across-slope shape: Concave
Hydric soil rating: No
Sudbury
Percent of map unit: 1 percent
Landscape: Valleys
Landform: Terraces, Outwash plains
Custom Soil Resource Report
24

Page 260

Down-slope shape: Concave
Across-slope shape: Linear
Hydric soil rating: No
307—Urban land
Map Unit Setting
National map unit symbol: 9lmh
Elevation: 0 to 2,000 feet
Mean annual precipitation: 43 to 56 inches
Mean annual air temperature: 45 to 55 degrees F
Frost-free period: 120 to 185 days
Farmland classification: Not prime farmland
Map Unit Composition
Urban land: 80 percent
Minor components: 20 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Urban Land
Typical profile
H - 0 to 6 inches: material
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 8
Hydrologic Soil Group: D
Hydric soil rating: Unranked
Minor Components
Udorthents, wet substratum
Percent of map unit: 10 percent
Anthropogenic features: Urban land
Down-slope shape: Convex
Across-slope shape: Linear
Hydric soil rating: No
Unnamed, undisturbed soils
Percent of map unit: 10 percent
Hydric soil rating: No
Custom Soil Resource Report
25

Page 261

308—Udorthents, smoothed
Map Unit Setting
National map unit symbol: 9lmj
Elevation: 0 to 2,000 feet
Mean annual precipitation: 43 to 56 inches
Mean annual air temperature: 45 to 55 degrees F
Frost-free period: 120 to 185 days
Farmland classification: Not prime farmland
Map Unit Composition
Udorthents and similar soils: 87 percent
Minor components: 13 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Udorthents
Setting
Anthropogenic Feature: Fills
Down-slope shape: Convex
Across-slope shape: Linear
Parent material: Human-transported material
Typical profile
^A - 0 to 5 inches: loam
^C1 - 5 to 21 inches: gravelly loam
^C2 - 21 to 79 inches: very gravelly sandy loam
Properties and qualities
Slope: 0 to 35 percent
Depth to restrictive feature: More than 80 inches
Drainage class: Well drained
Runoff class: Medium
Capacity of the most limiting layer to transmit water (Ksat): Very low to high (0.00 
to 1.98 in/hr)
Depth to water table: More than 80 inches
Frequency of flooding: None
Frequency of ponding: None
Available water supply, 0 to 60 inches: Moderate (about 6.8 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 4e
Hydrologic Soil Group: B
Hydric soil rating: No
Minor Components
Udorthents, wet substratum
Percent of map unit: 7 percent
Custom Soil Resource Report
26

Page 262

Anthropogenic features: Fills
Hydric soil rating: No
Urban land
Percent of map unit: 5 percent
Anthropogenic features: Urban land
Hydric soil rating: No
Rock outcrop
Percent of map unit: 1 percent
Landscape: Uplands
Landform: Hills
Down-slope shape: Convex
Across-slope shape: Convex
Hydric soil rating: No
Custom Soil Resource Report
27

Page 263

Soil Information for All Uses
Soil Properties and Qualities
The Soil Properties and Qualities section includes various soil properties and 
qualities displayed as thematic maps with a summary table for the soil map units in 
the selected area of interest. A single value or rating for each map unit is generated 
by aggregating the interpretive ratings of individual map unit components. This 
aggregation process is defined for each property or quality.
Soil Physical Properties
Soil Physical Properties are measured or inferred from direct observations in the 
field or laboratory. Examples of soil physical properties include percent clay, organic 
matter, saturated hydraulic conductivity, available water capacity, and bulk density.
Saturated Hydraulic Conductivity (Ksat), Standard 
Classes
Saturated hydraulic conductivity (Ksat) refers to the ease with which pores in a 
saturated soil transmit water. The estimates are expressed in terms of micrometers 
per second. They are based on soil characteristics observed in the field, particularly 
structure, porosity, and texture. Saturated hydraulic conductivity is considered in the 
design of soil drainage systems and septic tank absorption fields.
For each soil layer, this attribute is actually recorded as three separate values in the 
database. A low value and a high value indicate the range of this attribute for the 
soil component. A "representative" value indicates the expected value of this 
attribute for the component. For this soil property, only the representative value is 
used.
The numeric Ksat values have been grouped according to standard Ksat class 
limits. The classes are:
Very low: 0.00 to 0.01
Low: 0.01 to 0.1
28

Page 264

Moderately low: 0.1 to 1.0
Moderately high: 1 to 10
High: 10 to 100
Very high: 100 to 705
Custom Soil Resource Report
29

Page 265

30
Custom Soil Resource Report
Map—Saturated Hydraulic Conductivity (Ksat), Standard Classes
4641730 4641790 4641850 4641910 4641970 4642030 4642090
4641730 4641790 4641850 4641910 4641970 4642030 4642090
683070 683130 683190 683250 683310 683370 683430 683490 683550 683610 683670
683070 683130 683190 683250 683310 683370 683430 683490 683550 683610 683670
41°  54' 35'' N
72°  47' 34'' W
41°  54' 35'' N
72°  47' 6'' W
41°  54' 21'' N
72°  47' 34'' W
41°  54' 21'' N
72°  47' 6'' WN
Map projection: Web Mercator   Corner coordinates: WGS84   Edge tics: UTM Zone 18N WGS84
0 100 200 400 600
Feet
0 40 80 160 240
Meters
Map Scale: 1:2,940 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.

Page 266

MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
Very Low (0.0 - 0.01)
Low (0.01 - 0.1)
Moderately Low (0.1 - 1)
Moderately High (1 - 10)
High (10 - 100)
Very High (100 - 705)
Not rated or not available
Soil Rating Lines
Very Low (0.0 - 0.01)
Low (0.01 - 0.1)
Moderately Low (0.1 - 1)
Moderately High (1 - 10)
High (10 - 100)
Very High (100 - 705)
Not rated or not available
Soil Rating Points
Very Low (0.0 - 0.01)
Low (0.01 - 0.1)
Moderately Low (0.1 - 1)
Moderately High (1 - 10)
High (10 - 100)
Very High (100 - 705)
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at 
1:12,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause 
misunderstanding of the detail of mapping and accuracy of soil 
line placement. The maps do not show the small areas of 
contrasting soils that could have been shown at a more detailed 
scale.
Please rely on the bar scale on each map sheet for map 
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL: 
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator 
projection, which preserves direction and shape but distorts 
distance and area. A projection that preserves area, such as the 
Albers equal-area conic projection, should be used if more 
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as 
of the version date(s) listed below.
Soil Survey Area: State of Connecticut, Western Part
Survey Area Data: Version 6, Sep 16, 2025
Soil map units are labeled (as space allows) for map scales 
1:50,000 or larger.
Date(s) aerial images were photographed: Mar 1, 2024—Jul 1, 
2024
The orthophoto or other base map on which the soil lines were 
compiled and digitized probably differs from the background 
imagery displayed on these maps. As a result, some minor 
shifting of map unit boundaries may be evident.
Custom Soil Resource Report
31

Page 267

Table—Saturated Hydraulic Conductivity (Ksat), Standard 
Classes
Map unit symbol Map unit name Rating (micrometers 
per second)
Acres in AOI Percent of AOI
18 Catden and Freetown 
soils, 0 to 2 percent 
slopes
10.0000 2.0 5.5%
34A Merrimac fine sandy 
loam, 0 to 3 percent 
slopes
100.0000 1.5 4.0%
34B Merrimac fine sandy 
loam, 3 to 8 percent 
slopes
100.0000 2.9 7.9%
38C Hinckley loamy sand, 3 
to 15 percent slopes
100.0000 21.0 57.9%
38E Hinckley loamy sand, 15 
to 45 percent slopes
100.0000 0.5 1.2%
305 Udorthents-Pits complex, 
gravelly
23.0435 5.8 16.1%
307 Urban land 0.0 0.1%
308 Udorthents, smoothed 23.0435 2.6 7.2%
Totals for Area of Interest 36.2 100.0%
Rating Options—Saturated Hydraulic Conductivity (Ksat), 
Standard Classes
Units of Measure: micrometers per second
Aggregation Method: Dominant Component
Component Percent Cutoff: None Specified 
Tie-break Rule: Fastest
Interpret Nulls as Zero: No
Layer Options (Horizon Aggregation Method): Depth Range (Weighted Average)
Top Depth: 12
Bottom Depth: 48
Units of Measure: Inches
Soil Qualities and Features
Soil qualities are behavior and performance attributes that are not directly 
measured, but are inferred from observations of dynamic conditions and from soil 
properties. Example soil qualities include natural drainage, and frost action. Soil 
features are attributes that are not directly part of the soil. Example soil features 
Custom Soil Resource Report
32

Page 268

include slope and depth to restrictive layer. These features can greatly impact the 
use and management of the soil.
Hydrologic Soil Group
Hydrologic soil groups are based on estimates of runoff potential. Soils are 
assigned to one of four groups according to the rate of water infiltration when the 
soils are not protected by vegetation, are thoroughly wet, and receive precipitation 
from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and 
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly 
wet. These consist mainly of deep, well drained to excessively drained sands or 
gravelly sands. These soils have a high rate of water transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These 
consist chiefly of moderately deep or deep, moderately well drained or well drained 
soils that have moderately fine texture to moderately coarse texture. These soils 
have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist 
chiefly of soils having a layer that impedes the downward movement of water or 
soils of moderately fine texture or fine texture. These soils have a slow rate of water 
transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when 
thoroughly wet. These consist chiefly of clays that have a high shrink-swell 
potential, soils that have a high water table, soils that have a claypan or clay layer at 
or near the surface, and soils that are shallow over nearly impervious material. 
These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is 
for drained areas and the second is for undrained areas. Only the soils that in their 
natural condition are in group D are assigned to dual classes.
Custom Soil Resource Report
33

Page 269

34
Custom Soil Resource Report
Map—Hydrologic Soil Group
4641730 4641790 4641850 4641910 4641970 4642030 4642090
4641730 4641790 4641850 4641910 4641970 4642030 4642090
683070 683130 683190 683250 683310 683370 683430 683490 683550 683610 683670
683070 683130 683190 683250 683310 683370 683430 683490 683550 683610 683670
41°  54' 35'' N
72°  47' 34'' W
41°  54' 35'' N
72°  47' 6'' W
41°  54' 21'' N
72°  47' 34'' W
41°  54' 21'' N
72°  47' 6'' WN
Map projection: Web Mercator   Corner coordinates: WGS84   Edge tics: UTM Zone 18N WGS84
0 100 200 400 600
Feet
0 40 80 160 240
Meters
Map Scale: 1:2,940 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.

Page 270

MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at 
1:12,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause 
misunderstanding of the detail of mapping and accuracy of soil 
line placement. The maps do not show the small areas of 
contrasting soils that could have been shown at a more detailed 
scale.
Please rely on the bar scale on each map sheet for map 
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL: 
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator 
projection, which preserves direction and shape but distorts 
distance and area. A projection that preserves area, such as the 
Albers equal-area conic projection, should be used if more 
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as 
of the version date(s) listed below.
Soil Survey Area: State of Connecticut, Western Part
Survey Area Data: Version 6, Sep 16, 2025
Soil map units are labeled (as space allows) for map scales 
1:50,000 or larger.
Date(s) aerial images were photographed: Mar 1, 2024—Jul 1, 
2024
The orthophoto or other base map on which the soil lines were 
compiled and digitized probably differs from the background 
imagery displayed on these maps. As a result, some minor 
shifting of map unit boundaries may be evident.
Custom Soil Resource Report
35

Page 271

Table—Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
18 Catden and Freetown 
soils, 0 to 2 percent 
slopes
B/D 2.0 5.5%
34A Merrimac fine sandy 
loam, 0 to 3 percent 
slopes
A 1.5 4.0%
34B Merrimac fine sandy 
loam, 3 to 8 percent 
slopes
A 2.9 7.9%
38C Hinckley loamy sand, 3 
to 15 percent slopes
A 21.0 57.9%
38E Hinckley loamy sand, 15 
to 45 percent slopes
A 0.5 1.2%
305 Udorthents-Pits complex, 
gravelly
C 5.8 16.1%
307 Urban land D 0.0 0.1%
308 Udorthents, smoothed B 2.6 7.2%
Totals for Area of Interest 36.2 100.0%
Rating Options—Hydrologic Soil Group
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified 
Tie-break Rule: Higher
Custom Soil Resource Report
36

Page 272

References
American Association of State Highway and Transportation Officials (AASHTO). 
2004. Standard specifications for transportation materials and methods of sampling 
and testing. 24th edition.
American Society for Testing and Materials (ASTM). 2005. Standard classification of 
soils for engineering purposes. ASTM Standard D2487-00.
Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of 
wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife 
Service FWS/OBS-79/31.
Federal Register. July 13, 1994. Changes in hydric soils of the United States.
Federal Register. September 18, 2002. Hydric soils of the United States.
Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric 
soils in the United States.
National Research Council. 1995. Wetlands: Characteristics and boundaries.
Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. 
U.S. Department of Agriculture Handbook 18. http://www.nrcs.usda.gov/wps/portal/
nrcs/detail/national/soils/?cid=nrcs142p2_054262 
Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for 
making and interpreting soil surveys. 2nd edition. Natural Resources Conservation 
Service, U.S. Department of Agriculture Handbook 436. http://
www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053577 
Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of 
Agriculture, Natural Resources Conservation Service. http://
www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053580 
Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and 
Delaware Department of Natural Resources and Environmental Control, Wetlands 
Section.
United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of 
Engineers wetlands delineation manual. Waterways Experiment Station Technical 
Report Y-87-1.
United States Department of Agriculture, Natural Resources Conservation Service. 
National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/
home/?cid=nrcs142p2_053374 
United States Department of Agriculture, Natural Resources Conservation Service. 
National range and pasture handbook. http://www.nrcs.usda.gov/wps/portal/nrcs/
detail/national/landuse/rangepasture/?cid=stelprdb1043084 
37

Page 273

United States Department of Agriculture, Natural Resources Conservation Service. 
National soil survey handbook, title 430-VI. http://www.nrcs.usda.gov/wps/portal/
nrcs/detail/soils/scientists/?cid=nrcs142p2_054242 
United States Department of Agriculture, Natural Resources Conservation Service. 
2006. Land resource regions and major land resource areas of the United States, 
the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 
296. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?
cid=nrcs142p2_053624 
United States Department of Agriculture, Soil Conservation Service. 1961. Land 
capability classification. U.S. Department of Agriculture Handbook 210. http://
www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf 
Custom Soil Resource Report
38

Page 274

/0 /1/2 /2 /i255/2 /4/5/6/7/i255/8/9/10/i255/11/12 /5/13 /14/15 /i255/8/16/10/i255/11 /15/17/7/18/12 /19 /i255/20
/21 /12 /22/6/4/18/12 /19 /i255/19 /6/14/15 /23/i255/24 /18/14/7 /25 /13 /17/26/10/i255/27 /12 /19 /19 /15/22/4/18/22/13 /4/10/i255/28 /24 /2 /29
/21 /6/4/18/4/13 /30 /15/23/i255/9/8/31/32/16/33/33/34/10/i255/21 /12 /19 /35 /18/4/13 /30 /15/23/i255/36/33/37/31/33/38/38/39/34
/40 /5/15/41/6/4/18/12 /19 /23/i255/37/16/8/i255/42/4/29/29
/43/i255/45/46/47/48/49/50/51/i255/52 /53 /54 /55/i255/56/57 /58/45
/43/43/i255/45/46/47/48/49/50/51/i255/59 /53 /60/53
/61 /1/62 /0 /63 /i255/61 /64 /40 /27 /62/61 /62/63/2 /63 /62/1/0 /i255/65 /64 /40 /66/28 /40 /0 /27 /67 /i255/40 /24 /63 /62/68/2 /63 /40 /24
/53 /57/69/70/57/i255/71 /50/48/72/49/57/73/i255/53 /57/69/74/48/57/i255/71 /57/75/76/46/75/72/49/73/i255/56/72 /49/77/57/50/76/i255/53 /78/79/i255/80/57/47/48/50/69/78/73/i255/81 /57/48/76/i255/82/48/83/58/57/76/47/84/73/i255/85 /57/76/50/i255/59 /69/48/47/77/73/i255/86/48 /76/57/69/i255/87/72 /76/77/72/78/50
/88 /86/89 /89 /73/i255/88 /57/78/72/46/69/57/76/i255/87/50 /57/78/77/50/48/i255/53 /50/48/75/72/49/50/73/i255/53 /72/76/75/50/48/i255/53 /58/48/72/69/90/73/i255/56/57 /48/83/76/57/69/74
/71 /91 /92/78/57/93/47/76/57/48/i255/94/i255/71 /91 /92/90/48/57/58/77/72/49/57/76/i255/94/i255/56/57 /58/45/92/95 /92/57/50/48/72/57/76/45
/61 /65 /i255/4/6/25 /13 /5/6/17
/61 /96 /24 /36/25 /6/7/15/30 /i255/97 /12 /18/19 /4/i255/97 /17/15/22/18/97 /18/4/6/4/18/12 /19 /i255/42/17/15/98 /13 /15/19 /22/26/i255/15/7/4/18/14/6 /4/15/7/i255/99/18 /4/100 /i255/32/16/101/i255 /22/12 /19 /42/18/30 /15/19 /22/15/i255/18/19 /4/15/17/41/6/5/7/i255/102/18/19 /i255/18/19 /22/100 /15/7/103/8
/104 /105 /106/107/108/109/110 /111
/112 /113/114/106/107/115 /114/i255/106/114/117/105 /106/106/114/111 /117/114/i255/109/111 /108/114/106/113/107/118/i255/119/120/114/107/106/121/122
/123/124/125/123/126/124/125/125/126/123/126/126/124/126/126/125/126/126/123/126/126/126
/125/127/128 /109/111 /16/31/20/9/38 /129/130/79/131/132/133/134/130/79/135/136/130/137 /16/31/9/8/138 /129/130/79/139/131/130/134/130/79/136/139/133/137 /16/31/39/37/38 /129/130/79/135/130/135/134/130/79/132/133/136/137 /16/31/138/37/16 /129/130/79/135/140/131/134/130/79/133/141/141/137 /16/31/33/9/38 /129/130/79/136/136/139/134/141/79/130/131/137 /16/31/38/9/9 /129/130/79/132/141/131/134/141/79/141/133/137 /16/31/32/9/9 /129/130/79/132/132/132/134/141/79/139/140/137 /8/31/16/138 /129/130/79/140/130/133/134/141/79/136/140/137 /8/31/37/8 /129/130/79/140/133/136/134/141/79/133/133/137 /8/31/20/9 /129/130/79/133/135/142/134/131/79/141/131/137
/123/126/127/128 /109/111 /16/31/9/32/20 /129/130/79/139/140/142/134/130/79/132/139/140/137 /16/31/39/32/16 /129/130/79/135/136/139/134/130/79/140/132/139/137 /16/31/33/9/38 /129/130/79/136/140/131/134/130/79/142/140/130/137 /16/31/38/33/32 /129/130/79/132/132/142/134/141/79/141/136/137 /8/31/16/138 /129/130/79/140/133/139/134/141/79/135/136/137 /8/31/37/16 /129/130/79/133/132/140/134/141/79/132/140/137 /8/31/20/9 /129/130/79/142/135/139/134/141/79/142/135/137 /8/31/39/16 /129/141/79/130/130/134/131/79/131/139/137 /8/31/33/37 /129/141/79/141/141/134/131/79/132/132/137 /8/31/32/16 /129/141/79/131/130/134/139/79/130/130/137
/123/125/127/128 /109/111 /16/31/39/38/16 /129/130/79/135/135/132/134/130/79/140/135/142/137 /16/31/138/32/9 /129/130/79/136/139/139/134/130/79/133/142/140/137 /16/31/38/38/16 /129/130/79/132/140/135/134/141/79/141/135/137 /8/31/16/20 /129/130/79/140/133/140/134/141/79/139/136/137 /8/31/37/39 /129/130/79/142/131/141/134/141/79/140/130/137 /8/31/9/8 /129/141/79/130/131/134/141/79/142/132/137 /8/31/39/33 /129/141/79/141/141/134/131/79/131/133/137 /8/31/33/138 /129/141/79/141/133/134/131/79/132/131/137 /37/31/16/37 /129/141/79/139/141/134/139/79/141/139/137 /37/31/37/9 /129/141/79/135/131/134/139/79/136/139/137
/143/126/127/128 /109/111 /16/31/33/38/9 /129/130/79/132/130/131/134/141/79/130/141/137 /16/31/32/9/8 /129/130/79/140/131/131/134/141/79/131/131/137 /8/31/37/16 /129/130/79/142/141/140/134/141/79/136/136/137 /8/31/9/8 /129/141/79/130/140/134/141/79/133/135/137 /8/31/33/16 /129/141/79/131/132/134/131/79/139/139/137 /8/31/32/37 /129/141/79/135/130/134/131/79/132/142/137 /37/31/8/138 /129/141/79/136/131/134/139/79/141/139/137 /37/31/9/8 /129/141/79/132/131/134/139/79/136/142/137 /37/31/33/38 /129/141/79/133/130/134/135/79/131/142/137 /20/31/16/33 /129/141/79/142/135/134/135/79/133/136/137
/144/126/127/128 /109/111 /16/31/32/38/33 /129/130/79/140/136/142/134/141/79/131/133/137 /8/31/8/32 /129/130/79/142/141/131/134/141/79/136/135/137 /8/31/39/37 /129/141/79/141/132/134/141/79/142/140/137 /8/31/33/32 /129/141/79/139/132/134/131/79/139/139/137 /37/31/8/138 /129/141/79/132/130/134/131/79/142/136/137 /37/31/9/9 /129/141/79/140/140/134/139/79/135/131/137 /37/31/33/9 /129/141/79/142/139/134/139/79/142/133/137 /20/31/16/138 /129/131/79/130/132/134/135/79/136/140/137 /20/31/39/20 /129/131/79/131/133/134/136/79/135/136/137 /20/31/32/16 /129/131/79/135/140/134/132/79/141/132/137
/124/127/145 /106 /8/31/37/33 /129/130/79/142/133/139/134/141/79/132/139/137 /8/31/39/37 /129/141/79/141/133/134/141/79/142/132/137 /8/31/32/9 /129/141/79/135/142/134/131/79/136/130/137 /37/31/37/38 /129/141/79/140/136/134/131/79/142/132/137 /37/31/33/39 /129/131/79/130/136/134/139/79/140/136/137 /20/31/8/16 /129/131/79/131/140/134/135/79/139/139/137 /20/31/9/38 /129/131/79/135/133/134/136/79/130/132/137 /20/31/32/37 /129/131/79/132/135/134/136/79/133/141/137 /9/31/39/138 /129/131/79/142/132/134/140/79/130/139/137 /39/31/8/8 /129/139/79/131/135/134/133/79/130/139/137
/143/127/145 /106 /8/31/9/138 /129/141/79/141/135/134/141/79/133/140/137 /8/31/33/138 /129/141/79/139/132/134/131/79/131/136/137 /37/31/37/9 /129/141/79/140/139/134/131/79/133/140/137 /37/31/138/20 /129/131/79/130/131/134/139/79/135/130/137 /20/31/8/38 /129/131/79/139/133/134/135/79/139/131/137 /20/31/39/32 /129/131/79/132/135/134/136/79/130/130/137 /9/31/16/37 /129/131/79/133/142/134/136/79/133/132/137 /9/31/39/39 /129/139/79/130/140/134/132/79/140/139/137 /39/31/20/39 /129/139/79/135/133/134/133/79/131/141/137 /138/31/16/37 /129/139/79/133/139/134/142/79/135/135/137
/144/127/145 /106 /8/31/38/20 /129/141/79/135/139/134/131/79/139/139/137 /37/31/37/37 /129/141/79/140/135/134/131/79/133/139/137 /37/31/38/138 /129/131/79/131/139/134/139/79/132/136/137 /20/31/20/32 /129/131/79/132/131/134/135/79/139/136/137 /9/31/8/37 /129/139/79/141/130/134/136/79/136/133/137 /9/31/138/39 /129/139/79/135/135/134/132/79/135/140/137 /39/31/37/9 /129/139/79/140/142/134/140/79/132/139/137 /39/31/32/138 /129/135/79/130/135/134/133/79/140/133/137 /33/31/16/32 /129/135/79/132/131/134/141/130/79/133/137 /38/31/16/33 /129/136/79/141/136/134/141/131/79/132/137
/123/124/127/145 /106 /37/31/37/39 /129/141/79/140/140/134/131/79/133/139/137 /37/31/33/33 /129/131/79/141/133/134/139/79/136/130/137 /20/31/138/20 /129/131/79/133/135/134/135/79/132/130/137 /9/31/20/9 /129/139/79/139/133/134/136/79/136/139/137 /39/31/20/8 /129/135/79/130/139/134/140/79/141/140/137 /138/31/16/20 /129/135/79/136/130/134/133/79/139/132/137 /138/31/38/37 /129/135/79/142/133/134/142/79/142/131/137 /33/31/38/37 /129/136/79/139/141/134/141/141/79/136/137 /32/31/9/16 /129/132/79/141/136/134/141/135/79/139/137 /8/16/31/38 /129/132/79/142/130/134/141/132/79/140/137
/124/146/127/145 /106 /37/31/138/37 /129/131/79/130/140/134/139/79/131/133/137 /20/31/37/32 /129/131/79/132/130/134/135/79/141/139/137 /9/31/20/32 /129/139/79/135/132/134/136/79/136/131/137 /39/31/20/16 /129/135/79/141/132/134/132/79/140/141/137 /138/31/39/138 /129/136/79/130/141/134/133/79/133/131/137 /33/31/9/33 /129/136/79/132/131/134/141/130/79/139/137 /38/31/9/32 /129/132/79/131/132/134/141/131/79/135/137 /32/31/38/37 /129/132/79/132/142/134/141/135/79/139/137 /8/37/31/16 /129/140/79/133/136/134/141/133/79/141/137 /8/20/31/32 /129/133/79/142/130/134/131/141/79/135/137
/124/127/147 /107/120 /37/31/32/20 /129/131/79/139/135/134/139/79/132/136/137 /20/31/33/9 /129/131/79/142/133/134/135/79/132/132/137 /39/31/16/38 /129/135/79/130/139/134/132/79/139/136/137 /138/31/8/38 /129/135/79/133/133/134/140/79/140/133/137 /33/31/33/16 /129/136/79/142/139/134/141/130/79/139/137 /38/31/38/16 /129/132/79/132/133/134/141/131/79/131/137 /8/16/31/16 /129/140/79/135/142/134/141/135/79/140/137 /8/8/31/33 /129/133/79/130/141/134/141/140/79/130/137 /8/9/31/39 /129/142/79/136/135/134/131/141/79/142/137 /8/33/31/16 /129/141/141/79/130/134/131/132/79/141/137
/143/127/147 /107/120 /20/31/37/16 /129/131/79/136/132/134/139/79/142/132/137 /9/31/16/32 /129/139/79/131/140/134/136/79/130/133/137 /39/31/39/138 /129/135/79/135/139/134/132/79/142/131/137 /138/31/33/33 /129/136/79/139/132/134/133/79/135/142/137 /38/31/9/9 /129/132/79/136/139/134/141/141/79/139/137 /32/31/138/39 /129/140/79/139/132/134/141/139/79/139/137 /8/8/31/16 /129/133/79/131/132/134/141/132/79/141/137 /8/37/31/32 /129/133/79/133/139/134/141/133/79/140/137 /8/138/31/16 /129/141/130/79/132/134/131/135/79/141/137 /8/38/31/32 /129/141/131/79/131/134/131/133/79/142/137
/146/127/147 /107/120 /20/31/9/39 /129/131/79/140/140/134/135/79/131/132/137 /9/31/9/16 /129/139/79/136/139/134/136/79/135/136/137 /39/31/32/33 /129/135/79/140/140/134/140/79/135/141/137 /33/31/37/33 /129/136/79/140/133/134/142/79/130/142/137 /32/31/16/138 /129/140/79/130/139/134/141/131/79/141/137 /8/16/31/20 /129/140/79/142/130/134/141/135/79/131/137 /8/8/31/38 /129/133/79/133/133/134/141/140/79/131/137 /8/20/31/38 /129/142/79/135/133/134/131/130/79/130/137 /8/33/31/37 /129/141/141/79/139/134/131/136/79/140/137 /37/16/31/37 /129/141/139/79/141/134/139/130/79/142/137
/148/127/147 /107/120 /9/31/8/9 /129/139/79/139/135/134/136/79/130/133/137 /39/31/37/37 /129/135/79/131/141/134/132/79/135/131/137 /33/31/16/16 /129/136/79/132/131/134/133/79/132/135/137 /38/31/9/33 /129/132/79/140/132/134/141/130/79/136/137 /8/16/31/39 /129/133/79/141/140/134/141/139/79/142/137 /8/37/31/16 /129/142/79/141/132/134/141/132/79/139/137 /8/20/31/138 /129/141/130/79/131/134/141/142/79/140/137 /8/39/31/32 /129/141/130/79/142/134/131/131/79/133/137 /8/32/31/138 /129/141/139/79/130/134/131/142/79/131/137 /37/37/31/32 /129/141/135/79/133/134/139/135/79/142/137
/123/126/127/147 /107/120 /9/31/38/37 /129/139/79/142/130/134/136/79/142/130/137 /39/31/32/33 /129/135/79/133/139/134/140/79/139/131/137 /33/31/38/39 /129/132/79/139/139/134/142/79/132/132/137 /32/31/9/8 /129/140/79/136/135/134/141/141/79/140/137 /8/8/31/138 /129/142/79/130/141/134/141/136/79/131/137 /8/20/31/8 /129/141/130/79/141/134/141/140/79/133/137 /8/9/31/32 /129/141/141/79/131/134/131/141/79/139/137 /8/33/31/37 /129/141/141/79/142/134/131/135/79/132/137 /37/8/31/16 /129/141/139/79/142/134/139/141/79/139/137 /37/9/31/39 /129/141/136/79/142/134/139/140/79/141/137
/124/126/127/147 /107/120 /138/31/32/138 /129/136/79/132/140/134/133/79/135/132/137 /38/31/8/138 /129/132/79/132/135/134/142/79/142/139/137 /8/16/31/8 /129/133/79/131/141/134/141/131/79/135/137 /8/8/31/33 /129/142/79/135/140/134/141/135/79/135/137 /8/9/31/16 /129/141/130/79/142/134/141/133/79/131/137 /8/39/31/138 /129/141/131/79/130/134/131/130/79/142/137 /8/33/31/9 /129/141/139/79/130/134/131/135/79/136/137 /8/32/31/33 /129/141/139/79/140/134/131/133/79/141/137 /37/20/31/9 /129/141/136/79/132/134/139/135/79/132/137 /37/138/31/138 /129/141/140/79/139/134/135/130/79/131/137
/143/126/127/147 /107/120 /38/31/33/138 /129/140/79/141/140/134/141/130/79/132/137 /32/31/32/33 /129/133/79/141/132/134/141/131/79/141/137 /8/37/31/16 /129/142/79/140/136/134/141/135/79/132/137 /8/20/31/138 /129/141/141/79/130/134/141/132/79/140/137 /8/39/31/32 /129/141/131/79/135/134/131/130/79/136/137 /8/33/31/138 /129/141/139/79/136/134/131/139/79/131/137 /8/32/31/9 /129/141/135/79/135/134/131/132/79/133/137 /37/8/31/138 /129/141/136/79/130/134/139/130/79/136/137 /37/9/31/32 /129/141/132/79/132/134/139/132/79/132/137 /37/33/31/33 /129/141/133/79/141/134/135/141/79/140/137
/146/125/127/147 /107/120 /8/8/31/16 /129/142/79/130/136/134/141/139/79/139/137 /8/37/31/20 /129/141/130/79/141/134/141/135/79/133/137 /8/9/31/20 /129/141/141/79/140/134/141/140/79/139/137 /8/138/31/16 /129/141/139/79/130/134/141/142/79/136/137 /8/38/31/20 /129/141/135/79/135/134/131/139/79/135/137 /37/16/31/8 /129/141/136/79/135/134/131/132/79/139/137 /37/8/31/32 /129/141/132/79/131/134/131/142/79/142/137 /37/9/31/16 /129/141/132/79/133/134/139/139/79/140/137 /37/138/31/38 /129/141/133/79/130/134/139/142/79/131/137 /37/32/31/16 /129/141/133/79/142/134/135/139/79/132/137
/144/126/127/147 /107/120 /8/37/31/32 /129/141/130/79/132/134/141/136/79/136/137 /8/9/31/37 /129/141/141/79/140/134/141/140/79/141/137 /8/138/31/20 /129/141/139/79/135/134/141/142/79/140/137 /8/38/31/8 /129/141/135/79/140/134/131/131/79/130/137 /37/16/31/39 /129/141/132/79/141/134/131/132/79/130/137 /37/37/31/9 /129/141/140/79/141/134/131/142/79/130/137 /37/9/31/20 /129/141/140/79/133/134/139/131/79/132/137 /37/138/31/8 /129/141/133/79/135/134/139/132/79/132/137 /37/38/31/39 /129/141/142/79/131/134/135/141/79/132/137 /20/16/31/37 /129/141/142/79/140/134/135/136/79/131/137
/141/i255/71 /48/50/49/72/58/72/78/57/78/72/46/69/i255/149/48/50/150/47/50/69/49/83/i255/129/71 /91 /137/i255/50/45/78/72/151/57 /78/50/45/i255/72/69/i255/78/77/72/45/i255/78/57/93/76/50/i255/57/48/50/i255/93/57/45/50/74/i255/46/69/i255/149/48/50/150/47/50/69/49/83/i255/57/69/57/76/83/45/72/45/i255/46/149/i255/58/57/48/78/72/57/76/i255/74/47/48/57/78/72/46/69/i255/45/50/48/72/50/45/i255/129/71 /85 /53 /137/79
/88 /47/151/93 /50/48/45/i255/72/69/i255/58/57/48/50/69/78/77/50/45/72/45/i255/57/48/50/i255/71 /91 /i255/50/45/78/72/151/57 /78/50/45/i255/57/78/i255/76/46/152 /50/48/i255/57/69/74/i255/47/58/58/50/48/i255/93/46/47/69/74/45/i255/46/149/i255/78/77/50/i255/142/130/153/i255 /49/46/69/149/72/74/50/69/49/50/i255/72/69/78/50/48/75/57/76/79/i255/82 /77/50/i255/58/48/46/93/57/93/72/76/72/78/83/i255/78/77/57/78/i255/58/48/50/49/72/58/72/78/57/78/72/46/69/i255/149/48/50/150/47/50/69/49/83
/50/45/78/72/151/57 /78/50/45/i255/129/149/46/48/i255/57/i255/90/72/75/50/69/i255/74/47/48/57/78/72/46/69/i255/57/69/74/i255/57/75/50/48/57/90/50/i255/48/50/49/47/48/48/50/69/49/50/i255/72/69/78/50/48/75/57/76/137/i255/152 /72/76/76/i255/93/50/i255/90/48/50/57/78/50/48/i255/78/77/57/69/i255/78/77/50/i255/47/58/58/50/48/i255/93/46/47/69/74/i255/129/46/48/i255/76/50/45/45/i255/78/77/57/69/i255/78/77/50/i255/76/46/152 /50/48/i255/93/46/47/69/74/137/i255/72/45/i255/136/153/79 /i255/52 /45/78/72/151/57 /78/50/45/i255/57/78
/47/58/58/50/48/i255/93/46/47/69/74/45/i255/57/48/50/i255/69/46/78/i255/49/77/50/49/84/50/74/i255/57/90/57/72/69/45/78/i255/58/48/46/93/57/93/76/50/i255/151/57 /154/72/151/47 /151/i255 /58/48/50/49/72/58/72/78/57/78/72/46/69/i255/129/71 /56/71 /137/i255/50/45/78/72/151/57 /78/50/45/i255/57/69/74/i255/151/57 /83/i255/93/50/i255/77/72/90/77/50/48/i255/78/77/57/69/i255/49/47/48/48/50/69/78/76/83/i255/75/57/76/72/74/i255/71 /56/71 /i255/75/57/76/47/50/45/79
/71 /76/50/57/45/50/i255/48/50/149/50/48/i255/78/46/i255/88 /86/89 /89 /i255/89 /78/76/57/45/i255/141/135/i255/74/46/49/47/151/50 /69/78/i255/149/46/48/i255/151/46 /48/50/i255/72/69/149/46/48/151/57 /78/72/46/69/79
/155 /57/49/84/i255/78/46/i255/82/46/58
/61 /65 /i255/35 /17/6/97 /100 /18/22/6/5
/132/156/131/136/156/131/132/73/i255/131/51/130/131/i255/71 /56/71/48/50/49/72/58/72/78/57/78/72/46/69/i255/91 /48/50/150/47/50/69/49/83/i255/85 /57/78/57/i255/53 /50/48/75/50/48
/77/78/78/58/45/51/156/156/77/74/45/49/79/69/152 /45/79/69/46/57/57/79/90/46/75/156/58/149/74/45/156/58/149/74/45/92/58/48/72/69/78/58/57/90/50/79/77/78/151/76 /157/76/57/78/158/135/141/79/142/130/140/140/95 /76/46/69/158/159/140/131/79/140/133/133/136/95 /74/57/78/57/158/74/50/58/78/77/95 /47/69/72/78/45/158/50/69/90/76/72/45/77/95 /45/50/48/72/50/45/158/58/74/45/141/156/135

Page 275

/0 /1/2/3/i255/5/6/i255/7/6/8
/9/10 /11 /12/i255/14 /i255/10/15/16/17/10/18/12
/19 /20/10 /18/18/i255/12/21/10/18/15/i255/22/15/16/16/10/17/23
/24/25/26/27/25/26/24/28/i255/26/29/30/26/i255/31 /32/31/33/34/2/35/8/35/5/1/5/35/6/36/i255/37 /33/34/38/39/34/36/2/40/i255/41 /1/5/1/i255/42 /34/33/43/34/33
/44/5/5/8/45/29/25/25/44/46/45/2/47/36/48 /45/47/36/6/1/1/47/49/6/43/25/8/50/46/45/25/8/50/46/45/51/8/33/35/36/5/8/1/49/34/47/44/5/52/53 /54/53/1/5/55/56/57/47/58/30/59/59/60 /53/6/36/55/61/59/26/47/59/62/62/27/60 /46/1/5/1/55/46/34/8/5/44/60 /39/36/35/5/45/55/34/36/49/53/35/45/44/60 /45/34/33/35/34/45/55/8/46/45/26/25/56

Page 276

/0 /1/2/3 /4/i255/6/7/1/8/4/i255/9/4/2/2/1/10/11
/0 /1/2/3 /4/i255/6/7/1/8/4/i255/12/1 /13
/0 /1/2/3 /4/i255/6/7/1/8/4/i255/1/4/2/10/1/8
/14
/15
/16/17/12
/18/12/10
/14
/15
/19/20/20/17/12
/21/20/12/10
/14
/15
/19/20/20/17/12
/21/20/12/10
/22/23/24/25/23/24/22/26/i255/24/28/29/24/i255/30 /31/30/32 /33/34/35/36/35/37/38/37/35/39/40/i255/41 /32 /33/42/43/33/40/34/44/i255/45 /38/37/38/i255/46 /33/32 /47/33/32
/48/37/37/36/49/28/23/23/48/50/49/34/51/40/52 /49/51/40/39/38/38/51/53/39/47/23/36/54/50/49/23/36/54/50/49/55/36/32 /35/40/37/36/38/53/33/51/48/37/56/57 /58/57/38/37/59/60/61/51/62/29/63/63/64 /57/39/40/59/65/63/24/51/63/66/66/25/64 /50/38/37/38/59/50/33/36/37/48/64 /43/40/35/37/49/59/33/40/53/57/35/49/48/64 /49/33/32 /35/33/49/59/36/50/49/67/23/60

Page 277

/0 /1/2/3/i255/5/6/i255/7/6/8
/9 /10 /i255/11 /12/8/1/13/5/14/12 /15/5/i255/6/16/i255/17 /6/14/14/12 /13/2/12
/18 /1/5/19/6/15/1/20/i255/21/2 /12/1/15/19/2/i255/1/15/22/i255/23 /5/14/6 /24/8/25/12/13/19/2/i255/23 /22/14/19 /15/19/24/5/13/1/5/19/6/15
/18 /1/5/19/6/15/1/20/i255/26/12 /1/5/25/12/13/i255/10 /12/13/27/19/2/12
/18 /1/5/19/6/15/1/20/i255/26/1 /5/12/13/i255/17 /12/15/5/12/13
/28/29/30/31 /i255/32 /1/24/5/i255/26/12 /24/5/i255/33 /19/34/25/35 /1/36
/10 /19/20/27/12/13/i255/10 /8/13/19/15/34/37/i255/38/11 /i255/30/39/40/28/39
/41/42 /12/24/5/19/6/15/24/43/44/i255/33 /11 /10 /17 /45/41/42 /12/24/5/19/6/15/24/46/15 /6/1/1/45/34/6/27
/11 /19/24/2/20/1/19/14/12 /13
/47
/48
/49/50/50/51/52
/53/50/52/54
/55/56/30/31 /56/30/55/37/i255/30/44/39/30/i255/57 /38/57/13/12/2/19/8/19/5/1/5/19/6/15/i255/58 /13/12/59/42/12/15/2/36/i255/11 /1/5/1/i255/10 /12/13/27/12/13
/25/5/5/8/24/44/56/56/25/22/24/2/45/15/35 /24/45/15/6/1/1/45/34/6/27/56/8/16/22/24/56/8/16/22/24/60/8/13/19/15/5/8/1/34/12/45/25/5/14/20 /43/20/1/5/61/62/28/45/40/39/63/63/64 /20/6/15/61/65/63/30/45/63/66/66/31 /64 /22/1/5/1/61/22/12/8/5/25/64 /42/15/19/5/24/61/12/15/34/20/19/24/25/64 /24/12/13/19/12/24/61/8/22/24/62/56/62

Page 278

/0 /1/2 /2 /i255/2 /4/5/6/7/i255/8/9/10/i255/11/12 /5/13 /14/15 /i255/8/16/10/i255/11 /15/17/7/18/12 /19 /i255/20
/21 /12 /22/6/4/18/12 /19 /i255/19 /6/14/15 /23/i255/24 /18/14/7 /25 /13 /17/26/10/i255/27 /12 /19 /19 /15/22/4/18/22/13 /4/10/i255/28 /24 /2 /29
/21 /6/4/18/4/13 /30 /15/23/i255/9/8/31/32/16/33/33/34/10/i255/21 /12 /19 /35 /18/4/13 /30 /15/23/i255/36/33/37/31/33/38/38/39/34
/40 /5/15/41/6/4/18/12 /19 /23/i255/37/16/8/i255/42/4/29/29
/43/i255/45/46/47/48/49/50/51/i255/52 /53 /54 /55/i255/56/57 /58/45
/43/43/i255/45/46/47/48/49/50/51/i255/59 /53 /60/53
/61 /1/62 /0 /63 /i255/61 /64 /40 /27 /62/61 /62/63/2 /63 /62/1/0 /i255/65 /64 /40 /66/28 /40 /0 /27 /67 /i255/40 /24 /63 /62/68/2 /63 /40 /24
/53 /57/69/70/57/i255/71 /50/48/72/49/57/73/i255/53 /57/69/74/48/57/i255/71 /57/75/76/46/75/72/49/73/i255/56/72 /49/77/57/50/76/i255/53 /78/79/i255/80/57/47/48/50/69/78/73/i255/81 /57/48/76/i255/82/48/83/58/57/76/47/84/73/i255/85 /57/76/50/i255/59 /69/48/47/77/73/i255/86/48 /76/57/69/i255/87/72 /76/77/72/78/50
/88 /86/89 /89 /73/i255/88 /57/78/72/46/69/57/76/i255/87/50 /57/78/77/50/48/i255/53 /50/48/75/72/49/50/73/i255/53 /72/76/75/50/48/i255/53 /58/48/72/69/90/73/i255/56/57 /48/83/76/57/69/74
/71 /91 /92/78/57/93/47/76/57/48/i255/94/i255/71 /91 /92/90/48/57/58/77/72/49/57/76/i255/94/i255/56/57 /58/45/92/95 /92/57/50/48/72/57/76/45
/61 /65 /i255/4/6/25 /13 /5/6/17
/61 /96 /24 /36/25 /6/7/15/30 /i255/97 /12 /18/19 /4/i255/97 /17/15/22/18/97 /18/4/6/4/18/12 /19 /i255/42/17/15/98 /13 /15/19 /22/26/i255/15/7/4/18/14/6 /4/15/7/i255/99/18 /4/100 /i255/32/16/101/i255 /22/12 /19 /42/18/30 /15/19 /22/15/i255/18/19 /4/15/17/41/6/5/7/i255/102/18/19 /i255/18/19 /22/100 /15/7/103/100 /12 /13 /17/104/8
/105 /106 /107/108/109/110/111 /112
/113 /114/115/107/108/116 /115/i255/107/115/118/106 /107/107/115/112 /118/115/i255/110/112 /109/115/107/114/108/119/i255/120/121/115/108/107/122/123
/124/125/126/124/127/125/126/126/127/124/127/127/125/127/127/126/127/127/124/127/127/127
/126/128/129/110 /112 /9/31/8/38 /130/131/79/132/132/133/134/79/135/136/137 /9/31/32/32 /130/131/79/138/135/133/139/79/135/139/137 /140/31/20/9 /130/135/79/138/134/133/138/79/132/132/137 /33/31/9/9 /130/134/79/139/139/133/141/79/142/131/137 /38/31/32/38 /130/139/79/139/135/133/143/132/79/131/137 /8/16/31/8 /130/142/79/131/135/133/143/135/79/143/137 /8/8/31/20 /130/142/79/141/141/133/143/139/79/134/137 /8/37/31/33 /130/138/79/134/136/133/143/138/79/141/137 /8/9/31/140 /130/141/79/135/132/133/132/132/79/134/137 /8/140/31/8 /130/143/136/79/132/133/132/134/79/135/137
/124/127/128/129/110 /112 /37/31/32/140 /130/132/79/132/142/133/131/79/138/132/137 /20/31/39/9 /130/132/79/142/132/133/135/79/134/138/137 /9/31/9/32 /130/131/79/135/131/133/134/79/138/132/137 /39/31/37/33 /130/135/79/136/143/133/139/79/138/138/137 /140/31/20/39 /130/135/79/142/136/133/138/79/139/141/137 /33/31/8/33 /130/134/79/132/136/133/143/136/79/136/137 /38/31/16/37 /130/134/79/139/139/133/143/143/79/142/137 /38/31/32/33 /130/139/79/136/132/133/143/131/79/135/137 /8/16/31/20 /130/139/79/139/142/133/143/134/79/141/137 /8/8/31/9 /130/142/79/132/132/133/143/138/79/136/137
/124/126/128/129/110 /112 /37/31/20/37 /130/143/79/142/138/133/131/79/136/136/137 /37/31/33/38 /130/132/79/143/131/133/131/79/134/141/137 /20/31/39/37 /130/132/79/142/136/133/135/79/134/142/137 /9/31/8/9 /130/131/79/143/134/133/134/79/135/136/137 /9/31/32/38 /130/131/79/139/138/133/139/79/138/143/137 /39/31/140/20 /130/135/79/136/138/133/142/79/138/139/137 /140/31/20/16 /130/135/79/135/135/133/141/79/143/135/137 /33/31/16/9 /130/135/79/142/132/133/143/136/79/134/137 /38/31/16/32 /130/134/79/132/135/133/143/132/79/134/137 /38/31/32/39 /130/134/79/139/139/133/143/135/79/143/137
/144/127/128/129/110 /112 /8/31/39/33 /130/143/79/132/136/133/132/79/136/132/137 /8/31/38/38 /130/143/79/135/135/133/132/79/135/131/137 /37/31/9/16 /130/143/79/138/131/133/131/79/143/143/137 /37/31/38/37 /130/132/79/143/134/133/131/79/139/138/137 /20/31/9/8 /130/132/79/134/132/133/135/79/139/139/137 /20/31/38/39 /130/132/79/142/141/133/134/79/131/138/137 /9/31/20/8 /130/131/79/136/135/133/139/79/132/139/137 /9/31/38/37 /130/131/79/132/135/133/142/79/143/141/137 /39/31/39/39 /130/131/79/134/141/133/138/79/134/138/137 /140/31/8/9 /130/131/79/138/138/133/141/79/142/136/137
/145/127/128/129/110 /112 /16/31/32/38/33 /130/136/79/142/134/141/133/143/79/132/138/137 /8/31/8/32 /130/136/79/141/143/132/133/143/79/134/135/137 /8/31/39/37 /130/143/79/143/139/133/143/79/141/142/137 /8/31/33/32 /130/143/79/131/139/133/132/79/131/131/137 /37/31/8/140 /130/143/79/139/136/133/132/79/141/134/137 /37/31/9/9 /130/143/79/142/142/133/131/79/135/132/137 /37/31/33/9 /130/143/79/141/131/133/131/79/141/138/137 /20/31/16/140 /130/132/79/136/139/133/135/79/134/142/137 /20/31/39/20 /130/132/79/132/138/133/134/79/135/134/137 /20/31/32/16 /130/132/79/135/142/133/139/79/143/139/137
/125/128/146 /107 /16/31/140/20/39 /130/136/79/135/141/143/133/136/79/138/143/134/137 /16/31/33/140/8 /130/136/79/134/138/138/133/136/79/141/142/138/137 /16/31/32/140/38 /130/136/79/142/135/134/133/143/79/132/134/137 /8/31/8/9 /130/136/79/138/142/131/133/143/79/135/138/137 /8/31/20/38 /130/143/79/136/132/133/143/79/138/142/137 /8/31/39/39 /130/143/79/143/131/133/132/79/143/139/137 /8/31/33/9 /130/143/79/132/135/133/132/79/134/131/137 /8/31/32/140 /130/143/79/131/132/133/132/79/141/136/137 /37/31/37/38 /130/143/79/135/138/133/131/79/134/143/137 /37/31/39/39 /130/143/79/139/132/133/135/79/136/132/137
/144/128/146 /107 /16/31/9/38/140 /130/136/79/131/142/142/133/136/79/139/132/132/137 /16/31/39/38/9 /130/136/79/135/134/131/133/136/79/142/135/142/137 /16/31/33/9/9 /130/136/79/134/142/134/133/136/79/141/134/134/137 /16/31/38/33/140 /130/136/79/139/142/135/133/143/79/143/131/137 /8/31/16/140 /130/136/79/142/141/132/133/143/79/135/135/137 /8/31/8/32 /130/136/79/138/142/142/133/143/79/139/139/137 /8/31/20/9 /130/136/79/141/139/143/133/143/79/141/134/137 /8/31/39/37 /130/143/79/136/132/133/132/79/132/135/137 /8/31/33/38 /130/143/79/143/139/133/132/79/142/131/137 /37/31/16/16 /130/143/79/132/138/133/131/79/143/135/137
/145/128/146 /107 /16/31/20/16/140 /130/136/79/132/131/141/133/136/79/131/138/138/137 /16/31/20/33/8 /130/136/79/132/138/141/133/136/79/135/142/143/137 /16/31/9/33/33 /130/136/79/131/142/143/133/136/79/139/136/141/137 /16/31/39/140/39 /130/136/79/135/131/142/133/136/79/142/132/139/137 /16/31/140/38/33 /130/136/79/134/143/142/133/136/79/141/131/143/137 /16/31/33/33/140 /130/136/79/134/142/134/133/143/79/136/138/137 /16/31/38/33/9 /130/136/79/139/131/131/133/143/79/132/142/137 /16/31/32/32/39 /130/136/79/139/142/135/133/143/79/135/139/137 /8/31/8/38 /130/136/79/142/142/132/133/143/79/138/143/137 /8/31/20/39 /130/136/79/138/134/141/133/132/79/143/136/137
/124/125/128/146 /107 /16/31/8/38/140 /130/136/79/143/135/139/133/136/79/132/131/134/137 /16/31/37/37/32 /130/136/79/143/138/136/133/136/79/132/141/136/137 /16/31/20/16/16 /130/136/79/132/131/134/133/136/79/131/138/143/137 /16/31/20/39/32 /130/136/79/132/138/136/133/136/79/135/134/138/137 /16/31/9/9/16 /130/136/79/131/131/135/133/136/79/134/141/135/137 /16/31/39/16/16 /130/136/79/131/142/131/133/136/79/139/141/131/137 /16/31/39/140/39 /130/136/79/135/143/131/133/136/79/138/132/131/137 /16/31/140/9/38 /130/136/79/135/135/136/133/136/79/141/134/136/137 /16/31/33/33/32 /130/136/79/134/143/136/133/143/79/143/141/137 /16/31/38/32/9 /130/136/79/134/142/132/133/143/79/131/141/137
/125/147/128/146 /107 /16/31/8/16/32 /130/136/79/136/138/139/133/136/79/143/131/139/137 /16/31/8/20/33 /130/136/79/143/136/138/133/136/79/143/142/143/137 /16/31/8/38/37 /130/136/79/143/135/135/133/136/79/132/131/136/137 /16/31/37/37/16 /130/136/79/143/142/131/133/136/79/132/142/141/137 /16/31/37/33/20 /130/136/79/132/136/138/133/136/79/131/139/142/137 /16/31/20/8/8 /130/136/79/132/131/135/133/136/79/135/131/136/137 /16/31/20/39/20 /130/136/79/132/139/136/133/136/79/134/143/134/137 /16/31/9/16/32 /130/136/79/132/142/138/133/136/79/134/141/139/137 /16/31/9/32/38 /130/136/79/131/132/142/133/136/79/142/134/135/137 /16/31/39/33/33 /130/136/79/131/142/136/133/136/79/138/141/132/137
/125/128/148 /108/121 /16/31/16/140/8 /130/136/79/136/135/138/133/136/79/136/142/134/137 /16/31/16/33/38 /130/136/79/136/139/132/133/136/79/136/141/142/137 /16/31/8/16/39 /130/136/79/136/138/131/133/136/79/143/131/132/137 /16/31/8/37/38 /130/136/79/143/136/143/133/136/79/143/139/143/137 /16/31/8/140/16 /130/136/79/143/132/131/133/136/79/132/143/134/137 /16/31/8/38/20 /130/136/79/143/131/141/133/136/79/132/134/131/137 /16/31/37/16/32 /130/136/79/143/134/139/133/136/79/131/136/134/137 /16/31/37/9/9 /130/136/79/143/139/139/133/136/79/131/134/135/137 /16/31/20/16/37 /130/136/79/143/141/138/133/136/79/135/134/134/137 /16/31/20/39/9 /130/136/79/132/132/138/133/136/79/134/135/135/137
/144/128/148 /108/121 /16/31/16/9/9 /130/136/79/136/131/134/133/136/79/136/134/134/137 /16/31/16/39/140 /130/136/79/136/135/134/133/136/79/136/142/136/137 /16/31/16/33/33 /130/136/79/136/139/143/133/136/79/136/141/139/137 /16/31/16/32/9 /130/136/79/136/142/135/133/136/79/143/143/142/137 /16/31/8/8/33 /130/136/79/136/141/136/133/136/79/143/134/142/137 /16/31/8/20/9 /130/136/79/143/136/132/133/136/79/143/138/135/137 /16/31/8/39/20 /130/136/79/143/143/135/133/136/79/132/132/131/137 /16/31/8/33/32 /130/136/79/143/132/132/133/136/79/132/134/141/137 /16/31/37/37/37 /130/136/79/143/135/139/133/136/79/131/131/135/137 /16/31/37/140/8 /130/136/79/143/139/138/133/136/79/135/136/143/137
/147/128/148 /108/121 /16/31/16/20/39 /130/136/79/136/132/138/133/136/79/136/135/135/137 /16/31/16/9/39 /130/136/79/136/131/139/133/136/79/136/134/139/137 /16/31/16/140/37 /130/136/79/136/135/141/133/136/79/136/142/142/137 /16/31/16/33/39 /130/136/79/136/139/136/133/136/79/136/141/135/137 /16/31/16/32/9 /130/136/79/136/142/131/133/136/79/143/132/134/137 /16/31/8/16/33 /130/136/79/136/138/132/133/136/79/143/135/138/137 /16/31/8/37/20 /130/136/79/136/141/132/133/136/79/143/142/141/137 /16/31/8/9/20 /130/136/79/136/141/138/133/136/79/132/136/142/137 /16/31/8/33/38 /130/136/79/143/143/138/133/136/79/132/139/138/137 /16/31/37/8/16 /130/136/79/143/131/134/133/136/79/131/132/143/137
/149/128/148 /108/121 /16/31/16/37/9 /130/136/79/136/143/141/133/136/79/136/131/136/137 /16/31/16/20/8 /130/136/79/136/132/134/133/136/79/136/131/138/137 /16/31/16/9/8 /130/136/79/136/131/131/133/136/79/136/134/143/137 /16/31/16/39/16 /130/136/79/136/135/136/133/136/79/136/139/132/137 /16/31/16/140/37 /130/136/79/136/135/138/133/136/79/136/138/132/137 /16/31/16/33/8 /130/136/79/136/134/135/133/136/79/136/141/142/137 /16/31/16/38/8 /130/136/79/136/139/136/133/136/79/143/143/142/137 /16/31/16/32/9 /130/136/79/136/139/134/133/136/79/143/131/134/137 /16/31/8/8/140 /130/136/79/136/142/142/133/136/79/143/142/131/137 /16/31/8/20/140 /130/136/79/136/138/138/133/136/79/132/136/142/137
/124/127/128/148 /108/121 /16/31/16/37/16 /130/136/79/136/143/139/133/136/79/136/132/135/137 /16/31/16/37/9 /130/136/79/136/132/136/133/136/79/136/131/136/137 /16/31/16/20/37 /130/136/79/136/132/139/133/136/79/136/135/136/137 /16/31/16/20/32 /130/136/79/136/131/143/133/136/79/136/135/138/137 /16/31/16/9/38 /130/136/79/136/131/142/133/136/79/136/139/131/137 /16/31/16/39/9 /130/136/79/136/135/143/133/136/79/136/142/135/137 /16/31/16/140/8 /130/136/79/136/135/139/133/136/79/136/138/138/137 /16/31/16/33/8 /130/136/79/136/135/141/133/136/79/143/136/132/137 /16/31/16/38/33 /130/136/79/136/134/138/133/136/79/143/131/136/137 /16/31/8/16/8 /130/136/79/136/139/139/133/136/79/143/134/135/137
/125/127/128/148 /108/121 /16/31/16/8/9 /130/136/79/136/143/143/133/136/79/136/143/142/137 /16/31/16/8/140 /130/136/79/136/143/131/133/136/79/136/132/136/137 /16/31/16/37/8 /130/136/79/136/143/142/133/136/79/136/132/134/137 /16/31/16/37/9 /130/136/79/136/143/141/133/136/79/136/131/136/137 /16/31/16/37/32 /130/136/79/136/132/132/133/136/79/136/131/142/137 /16/31/16/20/37 /130/136/79/136/132/135/133/136/79/136/135/131/137 /16/31/16/20/140 /130/136/79/136/132/142/133/136/79/136/134/143/137 /16/31/16/9/8 /130/136/79/136/132/138/133/136/79/136/134/138/137 /16/31/16/9/38 /130/136/79/136/131/132/133/136/79/136/142/132/137 /16/31/16/39/39 /130/136/79/136/131/139/133/136/79/136/138/131/137
/144/127/128/148 /108/121 /16/31/16/8/37 /130/136/79/136/136/141/133/136/79/136/143/135/137 /16/31/16/8/20 /130/136/79/136/143/143/133/136/79/136/143/139/137 /16/31/16/8/140 /130/136/79/136/143/131/133/136/79/136/132/136/137 /16/31/16/8/38 /130/136/79/136/143/134/133/136/79/136/132/131/137 /16/31/16/37/37 /130/136/79/136/143/142/133/136/79/136/132/138/137 /16/31/16/37/9 /130/136/79/136/143/138/133/136/79/136/131/132/137 /16/31/16/37/140 /130/136/79/136/132/136/133/136/79/136/131/142/137 /16/31/16/37/32 /130/136/79/136/132/136/133/136/79/136/135/132/137 /16/31/16/20/9 /130/136/79/136/132/131/133/136/79/136/134/136/137 /16/31/16/20/38 /130/136/79/136/132/134/133/136/79/136/134/142/137
/147/126/128/148 /108/121 /16/31/16/8/16 /130/136/79/136/136/138/133/136/79/136/143/132/137 /16/31/16/8/8 /130/136/79/136/136/141/133/136/79/136/143/131/137 /16/31/16/8/20 /130/136/79/136/143/136/133/136/79/136/143/139/137 /16/31/16/8/9 /130/136/79/136/143/132/133/136/79/136/143/138/137 /16/31/16/8/140 /130/136/79/136/143/131/133/136/79/136/132/143/137 /16/31/16/8/38 /130/136/79/136/143/135/133/136/79/136/132/135/137 /16/31/16/37/16 /130/136/79/136/143/134/133/136/79/136/132/142/137 /16/31/16/37/37 /130/136/79/136/143/134/133/136/79/136/131/143/137 /16/31/16/37/9 /130/136/79/136/143/139/133/136/79/136/131/139/137 /16/31/16/37/140 /130/136/79/136/143/142/133/136/79/136/135/136/137
/145/127/128/148 /108/121 /16/31/16/16/38 /130/136/79/136/136/142/133/136/79/136/143/136/137 /16/31/16/16/32 /130/136/79/136/136/138/133/136/79/136/143/143/137 /16/31/16/8/8 /130/136/79/136/136/141/133/136/79/136/143/131/137 /16/31/16/8/37 /130/136/79/136/143/136/133/136/79/136/143/134/137 /16/31/16/8/9 /130/136/79/136/143/143/133/136/79/136/143/138/137 /16/31/16/8/39 /130/136/79/136/143/143/133/136/79/136/132/136/137 /16/31/16/8/140 /130/136/79/136/143/132/133/136/79/136/132/132/137 /16/31/16/8/38 /130/136/79/136/143/132/133/136/79/136/132/134/137 /16/31/16/8/32 /130/136/79/136/143/131/133/136/79/136/132/138/137 /16/31/16/37/16 /130/136/79/136/143/131/133/136/79/136/131/143/137
/143/i255/71 /48/50/49/72/58/72/78/57/78/72/46/69/i255/150/48/50/151/47/50/69/49/83/i255/130/71 /91 /137/i255/50/45/78/72/152/57 /78/50/45/i255/72/69/i255/78/77/72/45/i255/78/57/93/76/50/i255/57/48/50/i255/93/57/45/50/74/i255/46/69/i255/150/48/50/151/47/50/69/49/83/i255/57/69/57/76/83/45/72/45/i255/46/150/i255/58/57/48/78/72/57/76/i255/74/47/48/57/78/72/46/69/i255/45/50/48/72/50/45/i255/130/71 /85 /53 /137/79
/88 /47/152/93 /50/48/45/i255/72/69/i255/58/57/48/50/69/78/77/50/45/72/45/i255/57/48/50/i255/71 /91 /i255/50/45/78/72/152/57 /78/50/45/i255/57/78/i255/76/46/153 /50/48/i255/57/69/74/i255/47/58/58/50/48/i255/93/46/47/69/74/45/i255/46/150/i255/78/77/50/i255/141/136/154/i255 /49/46/69/150/72/74/50/69/49/50/i255/72/69/78/50/48/75/57/76/79/i255/82 /77/50/i255/58/48/46/93/57/93/72/76/72/78/83/i255/78/77/57/78/i255/58/48/50/49/72/58/72/78/57/78/72/46/69/i255/150/48/50/151/47/50/69/49/83/i255/50/45/78/72/152/57 /78/50/45/i255/130/150/46/48
/57/i255/90/72/75/50/69/i255/74/47/48/57/78/72/46/69/i255/57/69/74/i255/57/75/50/48/57/90/50/i255/48/50/49/47/48/48/50/69/49/50/i255/72/69/78/50/48/75/57/76/137/i255/153 /72/76/76/i255/93/50/i255/90/48/50/57/78/50/48/i255/78/77/57/69/i255/78/77/50/i255/47/58/58/50/48/i255/93/46/47/69/74/i255/130/46/48/i255/76/50/45/45/i255/78/77/57/69/i255/78/77/50/i255/76/46/153 /50/48/i255/93/46/47/69/74/137/i255/72/45/i255/134/154/79 /i255/52 /45/78/72/152/57 /78/50/45/i255/57/78/i255/47/58/58/50/48/i255/93/46/47/69/74/45/i255/57/48/50/i255/69/46/78
/49/77/50/49/84/50/74/i255/57/90/57/72/69/45/78/i255/58/48/46/93/57/93/76/50/i255/152/57 /155/72/152/47 /152/i255 /58/48/50/49/72/58/72/78/57/78/72/46/69/i255/130/71 /56/71 /137/i255/50/45/78/72/152/57 /78/50/45/i255/57/69/74/i255/152/57 /83/i255/93/50/i255/77/72/90/77/50/48/i255/78/77/57/69/i255/49/47/48/48/50/69/78/76/83/i255/75/57/76/72/74/i255/71 /56/71 /i255/75/57/76/47/50/45/79
/71 /76/50/57/45/50/i255/48/50/150/50/48/i255/78/46/i255/88 /86/89 /89 /i255/89 /78/76/57/45/i255/143/135/i255/74/46/49/47/152/50 /69/78/i255/150/46/48/i255/152/46 /48/50/i255/72/69/150/46/48/152/57 /78/72/46/69/79
/156 /57/49/84/i255/78/46/i255/82/46/58
/61 /65 /i255/35 /17/6/97 /100 /18/22/6/5
/139/157/132/134/157/132/139/73/i255/132/51/136/131/i255/71 /56/71/48/50/49/72/58/72/78/57/78/72/46/69/i255/91 /48/50/151/47/50/69/49/83/i255/85 /57/78/57/i255/53 /50/48/75/50/48
/77/78/78/58/45/51/157/157/77/74/45/49/79/69/153 /45/79/69/46/57/57/79/90/46/75/157/58/150/74/45/157/58/150/74/45/92/58/48/72/69/78/58/57/90/50/79/77/78/152/76 /158/76/57/78/159/135/143/79/141/136/142/142/95 /76/46/69/159/160/142/132/79/142/138/138/134/95 /74/57/78/57/159/72/69/78/50/69/45/72/78/83/95 /47/69/72/78/45/159/50/69/90/76/72/45/77/95 /45/50/48/72/50/45/159/58/74/45/143/157/135

Page 279

/0 /1/2/3/i255/5/6/i255/7/6/8
/9/10 /11 /12/i255/14 /i255/10/15/16/17/10/18/12
/19 /20/10 /18/18/i255/12/21/10/18/15/i255/22/15/16/16/10/17/23
/24/25/26/27/25/26/24/28/i255/26/29/30/31/i255/32 /33/32/34/35/2/36/8/36/5/1/5/36/6/37/i255/38 /34/35/39/40/35/37/2/41/i255/42 /1/5/1/i255/43 /35/34/44/35/34
/45/5/5/8/46/29/25/25/45/47/46/2/48/37/49 /46/48/37/6/1/1/48/50/6/44/25/8/51/47/46/25/8/51/47/46/52/8/34/36/37/5/8/1/50/35/48/45/5/53/54 /55/54/1/5/56/57/58/48/59/30/60/60/61 /54/6/37/56/62/60/26/48/60/63/63/27/61 /47/1/5/1/56/36/37/5/35/37/46/36/5/41/61 /40/37/36/5/46/56/35/37/50/54/36/46/45/61 /46/35/34/36/35/46/56/8/47/46/26/25/57

Page 280

/0 /1/2/3 /4/i255/6/7/1/8/4/i255/9/4/2/2/1/10/11
/0 /1/2/3 /4/i255/6/7/1/8/4/i255/12/1 /13
/0 /1/2/3 /4/i255/6/7/1/8/4/i255/1/4/2/10/1/8
/14
/15
/16/17/12
/18/12/10
/14
/15
/19/20/20/17/12
/21/20/12/10
/14
/15
/19/20/20/17/12
/21/20/12/10
/22/23/24/25/23/24/22/26/i255/24/28/29/30/i255/31 /32/31/33/34/35/36/37/36/38/39/38/36/40/41/i255/42 /33/34/43/44/34/41/35/45/i255/46 /39/38/39/i255/47 /34/33/48/34/33
/49/38/38/37/50/28/23/23/49/51/50/35/52/41/53 /50/52/41/40/39/39/52/54/40/48/23/37/55/51/50/23/37/55/51/50/56/37/33/36/41/38/37/39/54/34/52/49/38/57/58 /59/58/39/38/60/61/62/52/63/29/64/64/65 /58/40/41/60/66/64/24/52/64/67/67/25/65 /51/39/38/39/60/36/41/38/34/41/50/36/38/45/65 /44/41/36/38/50/60/34/41/54/58/36/50/49/65 /50/34/33/36/34/50/60/37/51/50/30/23/61

Page 281

/0 /1/2/3/i255/5/6/i255/7/6/8
/9 /10 /i255/11 /12/8/1/13/5/14/12 /15/5/i255/6/16/i255/17 /6/14/14/12 /13/2/12
/18 /1/5/19/6/15/1/20/i255/21/2 /12/1/15/19/2/i255/1/15/22/i255/23 /5/14/6 /24/8/25/12/13/19/2/i255/23 /22/14/19 /15/19/24/5/13/1/5/19/6/15
/18 /1/5/19/6/15/1/20/i255/26/12 /1/5/25/12/13/i255/10 /12/13/27/19/2/12
/18 /1/5/19/6/15/1/20/i255/26/1 /5/12/13/i255/17 /12/15/5/12/13
/28/29/30/31 /i255/32 /1/24/5/i255/26/12 /24/5/i255/33 /19/34/25/35 /1/36
/10 /19/20/27/12/13/i255/10 /8/13/19/15/34/37/i255/38/11 /i255/30/39/40/28/39
/41/42 /12/24/5/19/6/15/24/43/44/i255/33 /11 /10 /17 /45/41/42 /12/24/5/19/6/15/24/46/15 /6/1/1/45/34/6/27
/11 /19/24/2/20/1/19/14/12 /13
/47
/48
/49/50/50/51/52
/53/50/52/54
/55/56/30/31 /56/30/55/37/i255/30/44/39/29/i255/57 /38/57/13/12/2/19/8/19/5/1/5/19/6/15/i255/58 /13/12/59/42/12/15/2/36/i255/11 /1/5/1/i255/10 /12/13/27/12/13
/25/5/5/8/24/44/56/56/25/22/24/2/45/15/35 /24/45/15/6/1/1/45/34/6/27/56/8/16/22/24/56/8/16/22/24/60/8/13/19/15/5/8/1/34/12/45/25/5/14/20 /43/20/1/5/61/62/28/45/40/39/63/63/64 /20/6/15/61/65/63/30/45/63/66/66/31 /64 /22/1/5/1/61/19/15/5/12/15/24/19/5/36/64 /42/15/19/5/24/61/12/15/34/20/19/24/25/64 /24/12/13/19/12/24/61/8/22/24/62/56/62

Page 282

Page 283

 
 

Page 284

Page 285

Page 286

Page 287

Page 288

Page 289

Page 290

Page 291

Page 292

Page 293

Page 294

Page 295

Page 296

Page 297

Page 298

Page 299

Page 300

Page 301

Page 302

Page 303

Page 304

Page 305

Page 306

Page 307

Page 308

Page 309

Page 310

Page 311

Page 312

Page 313

Page 314

Page 315

Page 316

Page 317

Page 318

Page 319

Page 320

Page 321

Page 322

Page 323

Page 324

Page 325

Page 326

Page 327

Page 328

Page 329

Page 330

Page 331

Page 332

Page 333

Page 334

Page 335

Page 336

Page 337

Page 338

Page 339

Page 340

Page 341

S
S
S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
WG
WG
WG
WG
WG
S
WG
GG
WG
S
W
S
WG
S
S
GG
S
?
EE
WG
SEE NOTE #3
LINE
PROPERTY
FORMER
2622
CL&P
2623
CL&P
234
CL&P
3572
CL&P
4362
SNET
235
CL&P
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
C
C
C
FLAG POLE
D
G
A
TE
GRAVEL DRIVE
CONC. WALK
CONC. WALK
connection (typ.)
access/roadway 
Possible future 
connection (typ.)
access/roadway 
Possible future  
Total 24 Apartments 3 Story
BUILDING #4
Mixed Use Retail/Medical Office
Total 15,000 Square Feet 1 Story
BUILDING #2 30
40
13A
Total 24 Apartments
3 Story
BUILDING #5
50
Total 24 Apartments 3 StoryBUILDING #6
70
Signal
Traffic
VE
DR
IVE
W
A
Y
DRIVE
SAX
TO
N
B
R
OOK
DR.
ROAD
C
IRCLE
K
N
O
L
LW
O
O
D
C
E
N
T
E
R
-
W
O
O
D
R
D
.
WILLARD
GORDON
ST.
ST.
ELY
LANE
Saxton
Hoskins
ROAD
WESCOTT
ROAD
Brook
R
IVE
R
S
T
A
T
E
O
F
C
O
N
N
E
C
T
IC
U
T
315
W
E
S
T
WE
K
IL
BO
U
R
N
HO
W
A
R
D
S
T
.
R
D
.
(I
NA
C
T
IV
E
)
HOSKINS
SIMSBURY
AIRPORT
TULLER
DR.
WOLC
O
TT
SIMSBURY PINES
L
AU
R
IE
-
J
O
E
W
AY
47.02
47.45
47.54
47.93
48.04
48.21
0.85
0.92
1.04
1.3
EGDIRBRETSAC GNISSORC
TESROD CROSSING
S
T
R
E
E
T
47.61
47.71
DATE DESCRIPTION
                                                     
PROFESSIONAL SEAL
SHEET
DATE
REVISED
 4/30/26
 6/26/26
OFCONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
   1 6   
REVISION SUMMARY
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
PREPARED FOR
SCALE:   1" =    40'
PROJECT NUMBER:
00222 - 001  
 40 0  40  80  120
           DIAMOND SPARKLE CAR WASH LLC           
                359 LEBANON AVENUE                
               COLCHESTER, CT 06415               
                                                  
                                                  
                                                  
                DORSET CROSSING LLC               
                30 DORSET CROSSING                
                SIMSBURY, CT 06070                
                            SIMSBURY, CT
             DORSET CROSSING PAD            
           MASTER DEVELOPMENT PLAN          
                     PREPARED FOR                     
        DIAMOND SPARKLE CAR WASH LLC, APPLICANT       
                 TITLE SHEET                
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)        
DORSET          CROSSING          DRIVEMAP REFERENCES:
HO
P
M
E
ADO
W
 S
T
R
EET
 (C
T
 R
OU
TE
 10
 &
 202
)
BUILDING #1
CAR WASH
TOTAL 7,275 SF±
1 STORY
LOT A
67 SPACES
LOT F
LOT H
148 SPACES
INDEX OF SHEETS
TITLE SHEET                                                                         01    
       MASTER DEVELOPMENT PLAN      
SCALE:   1" =  1000'
                     APPLICANT                                                                                             OWNER                      
SCALE:   1" =  1000'
      ZONING LOCATION MAP     
       SITE LOCATION MAP      
DESCRIPTION SHEET NUMBER
DEVELOPMENT LAYOUT PLAN - LOT F                                                     02    
GRADING & DRAINAGE PLAN                                                             03    
UTILITY PLAN                                                                        04    
LIGHTING PLAN                                                                       05    
EROSION & SEDIMENTATION CONTROL PLAN                                                06    
                                                                                          
                                                                                          
                                                                                          
                                                                                          
                                                                                          
                                                                                          
         DORSET CROSSING PAD        
                  SITE MODIFICATION - LOT F                 
     10 DORSET CROSSING (M/B/L I04/403/13C-F)     
               SIMSBURY, CONNECTICUT              
LOT F
SITE
(HATCHED)
NDDB AREA
APA LIMIT
PAD
SITE
10
TOWN ROAD MAP OBTAINED FROM THE CONNECTICUT DEPARTMENT OF TRANSPORTATION DATABASE.4.
ADMINISTRATION (NOAA) OF THE US DEPARTMENT OF COMMERCE DATABASE.
ELEVATION DATA OBTAINED FROM MAP REFERENCE 1 AND NATIONAL OCEANIC AND ATMOSPHERIC3.
ORTHOIMAGERY SPRING 2025 FROM NEARMAP.2.
HESKETH & ASSOCIATES, INC.
DATE: 09-16-2011 AS REVISED THROUGH 10/10/11, SCALE: 1" = 40', SHEET UT-1, PREPARED BY F.A.
"UTILITY PLAN PREPARED FOR DORSET CROSSING, HOWMEADOW STREET, SIMSBURY, CONNECTICUT"2.
09-22-2023, SCALE: 1" = 100', PREPARED BY F.A. HESKETH & ASSOCIATES, INC.
DORSET CROSSING DRIVE, SIMSBURY, CONNECTICUT", DATE: 12-03-2021 AS REVISED THROUGH
"DORSET CROSSING PAD, MASTER DEVELOPMENT PLAN PREPARED FOR DORSET CROSSING, LLC,1.
16 SPACES

Page 342

S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
WG
S
S
GG
S
?
2622
CL&P
2623
CL&P
234
CL&P
3572
CL&P
4362
SNET
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
E
E
C
C
T
FLAG POLE
D
CONC. WALK
                            SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE:   1" =    20'
PROJECT NUMBER:
00222 - 001  
 20 0  20  40  60 
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION                       
SHEET
DATE
REVISED
 4/30/26
 6/26/26
OF   2 6   
REVISION SUMMARY
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
             DORSET CROSSING PAD            
           MASTER DEVELOPMENT PLAN          
                     PREPARED FOR                     
        DIAMOND SPARKLE CAR WASH LLC, APPLICANT       
       DEVELOPMENT LAYOUT PLAN - LOT F      
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)        
LP
LP
L
P
L
P
LP
LP
L
P
L
P
LP
LP
LP
LP
LP
VAC
VAC
VAC
VAC
H
O
P
M
E
A
D
O
W
 S
T
R
E
E
T
 (C
T
 R
O
U
T
E
 10 &
 202)
DORSET          CROSSING          DRIVE
V
A
C
V
A
C
V
A
C
V
A
C
V
A
C
V
A
C
V
A
C
EQUIPMENT
OFFICE
AUTOMATIC TUNNEL
TOUCHLESS
SELF 1
SELF 2
PLANNED AREA DEVELOPMENT (PAD)ZONE:
CAR WASHUSE: 
50.6' SY
MATCH APPROVED
PARKING/DRIVE SETBACK
5'
10'
MATCH APPROVED
PARKING/DRIVE SETBACK
21.8' R
Y
AND ACCESS PLAN HAS BEEN APPROVED.
PARKING SIDE AND REAR YARD SETBACKS MAY BE REDUCED TO 0 FEET WHERE A UNIFIED PARKING2.
APPROVED INFORMATION OBTAINED FROM MAP REFERENCE 1, SHEET MA-1.1.
ZONING NOTES:
10'
10'
10'
45'-0"
25'-4"
25'-4"
38'-0"
11'-4"
24'-0"
70'-0"
6'-0"
22'-0"
10'-0"
45'-0" 30'-0"
26'-0"
19'-0"
15'-0"
11'-4"
14'-8"
22'-0"
2'-0"
6'-0"
COMPLIES< 40 FTUNKNOWN40 FTBLDG. HEIGHT
REDUCTION35,426 SF40,000 SFN/AIMP. COVERAGE
INCREASE7,275 SF7,000 SFN/ABLDG. COVERAGE
REDUCTION7,275 SF12,000 SFN/ABLDG. AREA
NO CHANGE5 FT5 FT10 FTREAR YARD[2]
NO CHANGE5 FT5 FT10 FTSIDE YARD[2]
NO CHANGE10 FT10 FT10 FTFRONT YARD
PARKING SETBACKS
COMPLIES21.8 FT±21.1 FT±20 FTREAR YARD
N/AN/AN/A10 FTACCESSORY
COMPLIES50.6 FT±9.0 FT±20 FTPRINCIPAL
SIDE YARD
COMPLIES23.7 FT±20 FTCANOPY
COMPLIES60.8 FT±20.0 FT±20 FTBUILDING
FRONT YARD
NO CHANGE460.7 FT±460.7 FT±100 FTLOT FRONTAGE
NO CHANGE47,419 SF (1.08 AC)47,419 SF (1.08 AC)10,000 SFLOT AREA
NOTESPROPOSEDAPPROVED[1]REQUIREDITEM
2'
PARKING/DRIVE SETBACK
5.67'
10'
10'
10'
10'
10'
10'
10'
10'
16'
16'
62.4' SY
60.8' F
Y
 M
A
IN
 B
U
IL
D
IN
G
A
B
C
D
E
F
G
H
I
J
LEGEND
K
L
Mixed Use Retail/Medical Office
Total 15,000 Square Feet
1 Story
BUILDING #2
CONNECTION (TYP.)
ACCESS/ROADWAY
POSSIBLE FUTURE
A
24'
18'
18'
13'
15'
13'
21.33'
13'
A
A
A
A
21.33' A
A
2'
18'
B
B
B
C
D
G
G
G
G
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
G
G
H
I
J
TRASH ENCLOSURE
STOP SIGN
HANDICAP PARKING SIGN
HANDICAP RAMP (8.33% MAX.)
CONCRETE SIDEWALK
CONCRETE CURB & WALK MONO.
EXT. CONCRETE CURB (START/END)
BIT. CONCRETE CURB (START/END)
STOP BAR (12" WHITE)
LANE STRIPING (4" WHITE)
PARKING PAINT STRIPING (4" WHITE)
BITUMINOUS CONCRETE DRIVE
K
L
E
X
IS
T
IN
G
 D
R
IV
E
W
A
Y
AREA = 750 SF±
CANOPY LIMITS
PAY STATION
LIGHT FIXTURE (TYP. OF 12)
15' HIGH POLE MOUNTED
EXISTING LIGHT FIXTURE (TYP.)
HANDICAP PARKING MARKING
WALL PACK (FULL CUTOFF)
POLE MOUNTED LIGHT FIXTURE
HAYBALE
SILT FENCE
TELECOMMUNICATIONS
ELECTRIC
GAS SERVICE
WATER
SANITARY SEWER
CURTAIN/SLOPE/WALL DRAIN
ROOF LEADER
DRAINAGE PIPE
CONCRETE WALK & CURB MONO.
CONCRETE WALK
SAWCUT PAVEMENT
EDGE OF PAVEMENT W/ CURB
14'-8"
4'-0"
DETAIL
DRAINAGE EASEMENT
EASEMENT
EASEMENT
FAVOR OF CL&P
EASEMENT IN
OF AQUARION
EASEMENT IN FAVOR
TOWN OF SIMSBURY
EASEMENT IN FAVOR OF
8'
8'
9'
9'
9'
13'
A
A
5 S
P
A
C
E
S
 (V
A
C
.)
4 SPACES (VAC.)
18'
COMPLIES1 SP (1 VAN)1 SP (1 VAN)161 SP / 1-25 SPDEVELOPMENT TOTAL
ACCESSIBLE PARKING
COMPLIES16 SPACES5 SPACESTOTAL
11 SPACESN/AN/AN/APATRONS / VACUUM
3 SPACES3 SPACES31 SP / EMP.CAR WASH
2 SPACES2 SPACES2722.5 SP / 500 SFOFFICE
PARKING SPACES
NOTESPROPOSEDREQUIREDUNITSTANDARDITEM
GENERAL SITE NOTES
ACCESSIBLITY REQUIREMENTS.
CONTRACTOR TO CONFIRM WITH LOCAL CODES AND BUILDING INSPECTOR FOR SPECIFIC HANDICAPPED10.
COMPACTION.
GRANULAR BACKFILL. REFER TO GEOTECHNICAL REPORT FOR TYPE OF FILL TO ACHIEVE DESIRED
CONTRACTOR SHALL COMPLETELY FILL ALL TRENCHES WITHIN 5 FEET OF PAVEMENT EDGES WITH9.
TO THE OWNER.
CONSTRUCTION BY THE CONTRACTOR, HIS SUBCONTRACTORS OR SUPPLIERS AT NO ADDITIONAL COST
CONTRACTOR SHALL REPAIR, RESURFACE, RECONSTRUCT OR REFURBISH ANY AREAS DAMAGED DURING8.
ASPHALT. 
WITH FORM 819, TOWN OF SIMSBURY OR DOT STANDARDS WHERE NEW ASPHALT JOINS EXISTING
CONTRACTOR SHALL SEAL EDGE OF EXISTING ASPHALT PAVEMENT WITH TACK COAT IN ACCORDANCE7.
PROJECT LANDSCAPE ARCHITECT.
SEED SHALL BE APPLIED AT THE MINIMUM RATE RECOMMENDED BY THE MANUFACTURER OR THE
CONTRACTOR SHALL SUPPLY AND PLACE STRAW MULCH WHEREVER GRASS SEED HAS BEEN PLACED.6.
1" BELOW TOPS OF CURBS, WALKS, OR PAVEMENT ELEVATIONS WHERE TOPSOIL ABUTS THOSE AREAS.
OR AS DIRECTED BY THE PROJECT LANDSCAPE ARCHITECT.  TOP OF TOPSOIL LAYER SHALL BE PLACED
OTHERWISE NOTED. ALL NEW SEEDED OR SODDED AREAS SHALL HAVE A TOPSOIL LAYER OF 4" MINIMUM
ALL DISTURBED AREAS SHALL BE SEEDED OR SODDED AFTER FINISH GRADING IS COMPLETED UNLESS5.
FEATURES AS NECESSARY.
CONTRACTOR SHALL PROVIDE SMOOTH TRANSITIONS FROM PROPOSED FEATURES TO EXISTING4.
REPRESENTATIVE IMMEDIATELY.
DISCREPANCIES BETWEEN THE PLANS AND ACTUAL FIELD CONDITIONS TO THE OWNER OR OWNER'S
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS AND SHALL REPORT ANY
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO THE START OF CONSTRUCTION.3.
OR OTHER LIMITS AS DEPICTED ON THE PLAN.
ALL DIMENSIONS ARE TO THE EDGE OF PAVEMENT, FACE OF CURBS, OUTSIDE FACE OF THE BUILDING2.
CONSTRUCTION FORM 819 AS APPLICABLE AND THE TOWN OF SIMSBURY STANDARD SPECIFICATIONS.
TRANSPORTATION STANDARD SPECIFICATIONS FOR ROADS, BRIDGES, FACILITIES AND INCIDENTAL
ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE STATE OF CONNECTICUT DEPARTMENT OF1.
23.7' F
Y
 C
A
N
O
P
Y
63.0' F
Y
 M
A
IN
 B
U
IL
D
IN
G
18'
24'
15.5'
F
H
5'
4'
10'
FF = 201.50
AREA = 7,275 SF±
CAR WASH
1 STORY
BUILDING #1
DESIGN BY OTHERS
MONUMENT SIGN
DIAMOND SPARKLE
ZONING TABLE LOT F
PARKING TABLE LOT F
PARKING SPACE REQUIREMENTS PER SECTION 10.2.4USE: 
6 S
P
A
C
E
S
 (2 V
A
C
. / 1 H
A
 V
A
N
)
(TYP. OF 6)
MOUNT VACUUM
DUAL HEAD POST

Page 343

S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
WG
S
S
GG
S
?
2622
CL&P
2623
CL&P
234
CL&P
3572
CL&P
4362
SNET
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
E
E
C
C
T
FLAG POLE
D
CONC. WALK
                            SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE:   1" =    20'
PROJECT NUMBER:
00222 - 001  
 20 0  20  40  60 
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION                       
SHEET
DATE
REVISED
 5/18/26
 6/26/26
OF   3 6   
REVISION SUMMARY
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
             DORSET CROSSING PAD            
           MASTER DEVELOPMENT PLAN          
                     PREPARED FOR                     
        DIAMOND SPARKLE CAR WASH LLC, APPLICANT       
           GRADING & DRAINAGE PLAN          
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)        
+201.50 
       
        
        
+       
201.50 
        
        
+201.25 
       
        
        
+       
201.25 
        
        
+200.60 
       
        
        
+201.10 
       
        
        
+201.20 
       
        
        
+       
       
        
 201.50 
+       
201.80 
        
        
+200.50 
       
        
        
+       
       
 201.05 
        
+201.20 
       
        
        
+200.10 
       
        
        +               199.20         
+200.70 
       
        
        
+       
200.75 
        
        
+       
201.20 
        
        
+       
       
        
 201.25 
+200.55 
       
        
        
+200.10 
       
        
        
+       
201.05 
        
        
+       
       
        
 200.50 
+       
       
        
 200.50 
+       
       
 199.20 
        
+       
       
        
 200.80 
+       
       
        
 200.80 
+       
200.80 
        
        
+200.85 
       
        
        
+       
       
 201.60 
        
+       
202.00 
        
        
+       
202.00 
        
        
198
200
200
198
200
200
200
202
201
201
201
202
201
LP
L
P
L
P
LP
LP
L
P
L
P
LP
LP
LP
LP
LP
H
O
P
M
E
A
D
O
W
 S
T
R
E
E
T
 (C
T
 R
O
U
T
E
 10 &
 202)
DORSET          CROSSING          DRIVE
Mixed Use Retail/Medical Office
Total 15,000 Square Feet
1 Story
BUILDING #2
CONNECTION (TYP.)
ACCESS/ROADWAY
POSSIBLE FUTURE
DRAINAGE EASEMENT
EASEMENT
FAVOR OF CL&P
EASEMENT IN
OF AQUARION
EASEMENT IN FAVOR
TOWN OF SIMSBURY
EASEMENT IN FAVOR OF
FL = 193.65 (8")
TF = 202.94
EX. SMH
FL = 187.40 (8")
TF = 198.49
EX. SMH
250' - 8" P
V
C
 @
 0.025
FF = 201.50
CAR WASH
1 STORY
BUILDING #1
UTILITY STATEMENT
4455, IN ACCORDANCE WITH CBYD NOTIFICATION PROCEDURES PRIOR TO COMMENCING WORK. 
AUTHORITIES PRIOR TO CONSTRUCTION.  CONTRACTOR TO NOTIFY "CALL BEFORE YOU DIG" AT 1-800-922-
EXISTENCE OF ALL SUCH FEATURES MUST BE FIELD DETERMINED AND VERIFIED BY THE APPROPRIATE
IN NATURE. ADDITIONALLY, OTHER SUCH FEATURES MAY EXIST ON THE SITE. THE SIZE, LOCATION AND
IN THE AREA, EITHER IN-SERVICE OR ABANDONED.  THESE LOCATIONS MUST BE CONSIDERED APPROXIMATE
THIS PLAN SET MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES COMPRISE ALL SUCH UTILITIES
GOVERNMENT AGENCIES, PAROLE TESTIMONY, FIELD SURVEY AND OTHER SOURCES. THE SURVEYOR AND
COMPILED, IN PART, FROM RECORD MAPPING SUPPLIED BY THE RESPECTED UTILITY COMPANIES OR
UNDERGROUND UTILITY, STRUCTURE AND FACILITY LOCATIONS DEPICTED AND NOTED HEREON HAVE BEEN
STUBS PER MAP REF. 2 (VIF)
EXISTING 6" FIRE & 4" DOMESTIC
EXISTING GAS VALVE (VIF)
T
FL(NE) = 196.25 (NEW)
FL(W) = 196.25 (EX.)
TF = 199.10 (NEW)
TF = 198.37 (EX.)
EX. CB-C #F-100
FL(E) = 187.65 (EX.)
TF = 200.70 (NEW)
TF = 201.37 (EX.)
EX. SMH #F-200
FL(W) = 196.32 (EX.)
TF = 200.50 (NEW)
TF = 200.91 (EX.)
EX. CB-C #F-204
FL(S) = 190.88 (EX.)
TF = 201.05 (NEW)
TF = 201.97 (EX.)
EX. SMH #F-201
FL(N) = 190.74 (EX.)
FL(SW) = 191.19 (EX.)
FL(SE) = 190.70 (EX.)
FL(NE) = 196.03 (EX.)
TF = 201.20 (NEW)
TF = 201.88 (EX.)
EX. SMH #F-203
FL(NE) = 191.61 (EX.)
FL(W) = 191.60 (EX.)
TF = 200.10 (NEW)
TF = 200.70 (EX.)
EX. CB-C #F-205
FL(E) = 192.12 (EX.)
FL(S) = 192.09 (EX.)
TF = 199.10 (NEW)
TF = 200.67 (EX.)
EX. CB-C #F-206
@ 0.6%
26 LF - 12" HDPE
FL = 196.40
TF = 199.65
PR. DMH #F-101
@ 0.7%
22 LF - 8" HDPE
FL(E) = 193.80 (24")
FL(W) = 196.55 (12")
TF = 200.05
PR. DMH #F-103
@ 0.9%
110 LF - 12" HDPE
FL(W) = 193.80 (24")
FL(N) = 196.55 (8")
TF = 199.75
PR. DMH #F-104
FL = 197.90 (8")
TF = 200.90
PR. YD #F-106
@ 1.0%
65 LF - 8" HDPE
FL = 197.25 (8")
TF = 200.25
PR. YD #F-105
@ 2.5%
28 LF - 8" HDPE
@ 0.5%
40 LF - 8" HDPE
FL(SE) = 197.80 (NEW)
FL(W) = 197.60 (EX.)
FL(NE) = 197.79 (EX.)
TF = 202.01 (EX.)
EX. CB-C #F-300
FL(N) = 190.73 (EX.)
FL(S) = 190.76 (EX.)
TF = 201.10 (NEW)
TF = 202.01 (EX.)
CONTECH STC 900
EX. STS #F-202
GRADING NOTES
FLOW LINE ELEVATIONS GIVEN AT END OF PIPE SECTIONS.10.
ON THE PLANS.
SEE APPROPRIATE DETAILS TO DETERMINE SUBGRADE ELEVATIONS BELOW FINISH GRADE INDICATED9.
ALL PROPOSED SPOT ELEVATIONS ARE THE FINAL PAVEMENT AND FINAL GRADE ELEVATIONS.8.
AND CORRECT IF ANY, "BIRD BATH" CONDITIONS.
PROVIDE POSITIVE DRAINAGE WITHOUT PONDING. AFTER INSTALLATION, CONTRACTOR TO TEST FOR,7.
PARKING AREAS WILL BE DETERMINED AT THE TIME OF CONSTRUCTION.
NECESSITY FOR SUBDRAINS AND/OR REMOVAL OF ANY UNSUITABLE MATERIAL WITHIN THE PROPOSED
WEIGHT ROLLER TO DETERMINE LOCATIONS OF ANY POCKETS OF UNSUITABLE MATERIAL. THE
AFTER REMOVING PAVEMENT AND/OR STRIPPING TOPSOIL MATERIAL, PROOFROLL WITH A MEDIUM6.
GRANULAR MATERIAL IF WITHIN 5 FEET OF PAVEMENT OR CONCRETE.
TRENCHES FOR ALL STORM DRAIN LINES SHALL BE BACKFILLED COMPLETELY WITH ENGINEERED5.
CONSTRUCTION.
NOTIFY THE UTILITY COMPANY SO A REPRESENTATIVE IS PRESENT TO INSTRUCT AND OBSERVE DURING
COMPANIES.  WHEN EXCAVATING IS AROUND OR OVER EXISTING UTILITIES, THE CONTRACTOR MUST
ON SITE.  ALL VERIFICATIONS (LOCATION, SIZE AND DEPTH) SHALL BE MADE BY THE APPROPRIATE UTILITY
START, OR AS REQUIRED BY GOVERNING UTILITY COMPANY, TO VERIFY IF ANY UTILITIES ARE PRESENT
THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES 72 HOURS BEFORE CONSTRUCTION IS TO4.
AND/OR COMPANIES SO AS NOT TO CAUSE DAMAGE.
EXISTING UTILITY LINES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTORS
THE EXCAVATING CONTRACTOR SHALL TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND3.
REPRESENTATIVE IMMEDIATELY.
DISCREPANCIES BETWEEN THE PLANS AND ACTUAL FIELD CONDITIONS TO THE OWNER OR OWNER'S
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS AND SHALL REPORT ANY
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO THE START OF CONSTRUCTION.2.
BE PERFORMED IN ACCORDANCE WITH THE TOWN OF SIMSBURY STANDARD SPECIFICATIONS.
CONSTRUCTION FORM 819 AS APPLICABLE. WORK WITHIN THE DORSET CROSSING RIGHT-OF-WAY SHALL
TRANSPORTATION STANDARD SPECIFICATIONS FOR ROADS, BRIDGES, FACILITIES AND INCIDENTAL
ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE STATE OF CONNECTICUT DEPARTMENT OF1.
DRAINAGE
STORMWATER O & M
BOTTOM STONE = 192.90±
BOTTOM CHAMBERS = 193.65±
16 CHAMBERS (2 ROWS X 8 UNITS)
SUBSURFACE INFILTRATION SYSTEM
PROPOSED STORMTECH MC-3500
TOP CHAMBERS = 192.29±
BOTTOM CHAMBERS = 187.02±
48 MODULES (4 ROWS X 12 UNITS)
SYSTEM WITH DURA-SKRIM LINER
EXISTING 'RETAIN IT' DETENTION
RL FL = 199.80
RL FL = 199.80
LEADER @ 1.0% (TYP.)
190 LF PVC ROOF
FL(E) = 197.06
FL(W) = 197.01
TF = 201.86
EX. CB-C
FL(SE & NW) = 197.54
FL(N) = 199.23
TF = 202.17
EX. CB-C
FL = 196.13
TF = 199.22
EX. CB-C
FL(W) = 195.74
FL(N) = 195.76
TF = 198.99
EX. CB-C
FL(N) = 192.29
TF = 196.09
EX. CB-C
FL(N) = 192.11
FL(S) = 192.22
TF = 196.01
EX. CB-C
FL = 198.28
TF = 201.04
EX. CB-C
EASEMENT
FL = 197.35
TF = 200.50
48" SUMP W/ HOOD
PR. CB-CL #F-102
FL = 198.00
TF = 200.85
48" SUMP W/ HOOD
PR. CB-CL #F-301
E
X
IS
T
IN
G
 D
R
IV
E
W
A
Y
MANUFACTURER'S RECOMMENDATIONS.
STORMTECH MC-3500 UNITS TO BE INSPECTED AND MAINTAINED IN ACCORDANCE WITH THED.
REMOVE SAND, SALT AND OTHER DEBRIS FROM THE WINTER MAINTENANCE SEASON.
ACCESS DRIVES, PARKING AREAS AND SIDEWALKS SHALL BE SWEPT ANNUALLY EACH SPRING TOC.
DIVERTS FLOW SHALL BE REMOVED AND DISPOSED OF IN AN APPROVED MANNER.
FOLIAGE CLEANUP AND A SECOND TIME DURING SPRING CLEANUP.  ALL DEBRIS THAT OBSTRUCTS OR
INSPECT EACH VEGETATED/LANDSCAPED AREA TWICE ANNUALLY, ONCE IN THE FALL AS PART OFB.
IN AN APPROVED MANNER.
FOLLOWING THE WINTER SEASON.  REMOVE ALL COLLECTED SEDIMENT AND DEBRIS AND DISPOSE OF
INSPECT EACH CATCH BASIN AND STORMWATER TREATMENT STRUCTURE ANNUALLY IN THE SPRINGA.
THE FOLLOWING MAINTENANCE SHALL BE PERFORMED AND A MAINTENANCE LOG COMPLETED.2.
OWNER & PARTY RESPONSIBLE FOR OPERATION AND MAINTENANCE: DIAMOND SPARKLE CAR WASH, LLC1.
MANAGEMENT SYSTEMS FUNCTION AS DESIGNED.
THE FOLLOWING OPERATION & MAINTENANCE PLAN SHALL BE IMPLEMENTED TO ENSURE THAT STORMWATER
LEADER @ 1.0% (TYP.)
165 LF PVC ROOF
FL = 194.15
6" INSERTA TEE
ACCORDANCE WITH THE 2024 STORMWATER QUALITY MANUAL.
TREATMENT HAS BEEN DESIGN AND IMPLEMENTED TO THE MAXIMUM EXTENT ACHIEVABLE INF.
BEEN INSTALLED, AND NO OTHER PRETREATMENT BMP'S ARE FEASIBLE.
CONNECTED TO A DOWNSTREAM SYSTEM WHERE OTHER TREATMENT PRACTICES HAVE ALREADY
A CONTRIBUTING DRAINAGE AREA OF 0.16 ACRES (<0.25), IS IN AN OFFLINE CONFIGURATION, IS
CATCH BASIN #F-301 WILL BE INSTALLED WITH A DEEP SUMP (48") AND A HOOD. THE BASIN HASE.
BEEN INSTALLED, AND NO OTHER PRETREATMENT BMP'S ARE FEASIBLE.
CONNECTED TO A DOWNSTREAM SYSTEM WHERE OTHER TREATMENT PRACTICES HAVE ALREADY
A CONTRIBUTING DRAINAGE AREA OF 0.13 ACRES (<0.25), IS IN AN OFFLINE CONFIGURATION, IS
CATCH BASIN #F-102 WILL BE INSTALLED WITH A DEEP SUMP (48") AND A HOOD. THE BASIN HASD.
CALCULATED WQF RATE OF 1.0 CFS.
MAXIMUM WATER QUALITY FLOW (WQF) TREATMENT RATE OF 1.4 CFS, WHICH EXCEEDS THE
CONTECH STC 900 HYDRODYNAMIC SEPARATOR. THE EXISTING TREATMENT STRUCTURE HAS A
EXISTING 200 SERIES COLLECTION STRUCTURES WILL DISCHARGE THROUGH AN EXISTINGC.
INFILTRATE THE CALCULATED WATER QUALITY VOLUME (WQV) EQUIVALENT TO 1.3" OF RAINFALL.
TO A STORMTECH MC-3500 SUBSURFACE INFILTRATION SYSTEM SIZED TO FULLY RETAIN AND
CLEAN RUNOFF FROM THE ROOF AND ADJACENT LANDSCAPED RAIN GARDENS WILL DISCHARGEB.
ALL CATCH BASINS SHALL HAVE 24" (MIN.) SUMPS EXCEPT AS NOTED.A.
STORMWATER RUNOFF FROM ALL NEW IMPERVIOUS SURFACES WILL BE TREATED AS FOLLOWS:3.
DISCHARGING OFF-SITE AS COMPARED TO THE APPROVED PAD DEVELOPMENT.
THERE WILL BE NO NET INCREASE IN PEAK FLOW RATES FOR THE 1-YEAR THROUGH 100-YEAR STORM2.
SITE VIA CONNECTION TO THE EXISTING COLLECTION SYSTEMS ON SITE.
A SERIES OF ROOF LEADERS, YARD DRAINS, CATCH BASINS & DRAINAGE PIPING AND DISCHARGED OFF
STORMWATER RUNOFF FROM THE PROPOSED DEVELOPMENT OF LOT F WILL BE COLLECTED THROUGH2.
FURNISHING MATERIALS.
THE CONTRACTOR SHALL CONFIRM ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO ORDERING AND/OR
OF THE ORIGINAL DORSET CROSSING PAD MASTER DEVELOPMENT PLAN. SEE MAP REFERENCES 1 & 2.
THE DRAINAGE SYSTEM SERVING LOT F HAS BEEN PARTIALLY INSTALLED AS PART OF THE CONSTRUCTION1.

Page 344

S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
WG
S
S
GG
S
?
2622
CL&P
2623
CL&P
234
CL&P
3572
CL&P
4362
SNET
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
E
E
C
C
T
FLAG POLE
D
CONC. WALK
                            SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE:   1" =    20'
PROJECT NUMBER:
00222 - 001  
 20 0  20  40  60 
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION                       
SHEET
DATE
REVISED
 5/18/26
 6/26/26
OF   4 6   
REVISION SUMMARY
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
             DORSET CROSSING PAD            
           MASTER DEVELOPMENT PLAN          
                     PREPARED FOR                     
        DIAMOND SPARKLE CAR WASH LLC, APPLICANT       
                UTILITY PLAN                
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)        
+201.50 
       
        
        
+       
201.50 
        
        
+201.25 
       
        
        
+       
201.25 
        
        
+200.60 
       
        
        
+201.10 
       
        
        
+201.20 
       
        
        
+       
       
        
 201.50 
+       
201.80 
        
        
+200.50 
       
        
        
+       
       
 201.05 
        
+201.20 
       
        
        
+200.10 
       
        
        +               199.20         
+200.70 
       
        
        
+       
200.75 
        
        
+       
201.20 
        
        
+       
       
        
 201.25 
+200.55 
       
        
        
+200.10 
       
        
        
+       
201.05 
        
        
+       
       
        
 200.50 
+       
       
        
 200.50 
+       
       
 199.20 
        
+       
       
        
 200.80 
+       
       
        
 200.80 
+       
200.80 
        
        
+200.85 
       
        
        
+       
       
 201.60 
        
+       
202.00 
        
        
+       
202.00 
        
        
198
200
200
198
200
200
200
202
201
201
201
202
201
LP
L
P
L
P
LP
LP
L
P
L
P
LP
LP
LP
LP
LP
H
O
P
M
E
A
D
O
W
 S
T
R
E
E
T
 (C
T
 R
O
U
T
E
 10 &
 202)
DORSET          CROSSING          DRIVE
Mixed Use Retail/Medical Office
Total 15,000 Square Feet
1 Story
BUILDING #2
CONNECTION (TYP.)
ACCESS/ROADWAY
POSSIBLE FUTURE
DRAINAGE EASEMENT
EASEMENT
EASEMENT
FAVOR OF CL&P
EASEMENT IN
OF AQUARION
EASEMENT IN FAVOR
TOWN OF SIMSBURY
EASEMENT IN FAVOR OF
FL = 193.65 (8")
TF = 202.94
EX. SMH
FL = 187.40 (8")
TF = 198.49
EX. SMH
FF = 201.50
CAR WASH
1 STORY
BUILDING #1
ROOM
UTILITY
METER
ELECTRIC
METER
GAS
EXISTING TRANSFORMER
E
X
IS
T
IN
G
 D
R
IV
E
W
A
Y
UTILITY STATEMENT
4455, IN ACCORDANCE WITH CBYD NOTIFICATION PROCEDURES PRIOR TO COMMENCING WORK. 
AUTHORITIES PRIOR TO CONSTRUCTION.  CONTRACTOR TO NOTIFY "CALL BEFORE YOU DIG" AT 1-800-922-
EXISTENCE OF ALL SUCH FEATURES MUST BE FIELD DETERMINED AND VERIFIED BY THE APPROPRIATE
IN NATURE. ADDITIONALLY, OTHER SUCH FEATURES MAY EXIST ON THE SITE. THE SIZE, LOCATION AND
IN THE AREA, EITHER IN-SERVICE OR ABANDONED.  THESE LOCATIONS MUST BE CONSIDERED APPROXIMATE
THIS PLAN SET MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES COMPRISE ALL SUCH UTILITIES
GOVERNMENT AGENCIES, PAROLE TESTIMONY, FIELD SURVEY AND OTHER SOURCES. THE SURVEYOR AND
COMPILED, IN PART, FROM RECORD MAPPING SUPPLIED BY THE RESPECTED UTILITY COMPANIES OR
UNDERGROUND UTILITY, STRUCTURE AND FACILITY LOCATIONS DEPICTED AND NOTED HEREON HAVE BEEN
UTILITY NOTES
WATER NOTES
SANITARY NOTES
ELECTRIC & TELECOMMUNICATIONS
GAS
FOR CLARITY PIPES MAY NOT BE DRAWN TO SCALE OR EXACTLY LOCATED.5.
THE INFORMATION ON THE DRAWINGS.
FIELD VERIFIED. NOTIFICATION SHALL BE GIVEN TO THE OWNER IF THE FIELD VERIFICATION DIFFERS FROM
IS IN THE VICINITY OF EXISTING PIPING, THE LOCATION AND ELEVATION OF THE EXISTING PIPING SHALL BE
WHEN CONNECTIONS ARE TO BE MADE TO EXISTING PIPING AND STRUCTURES OR WHERE CONSTRUCTION4.
BE CONTACTED BY THE CONTRACTOR.
BEFORE WORKING WITH OR AROUND EXISTING UTILITIES, THE APPROPRIATE UTILITY COMPANY SHALL3.
THE CONTRACTOR, AT HIS EXPENSE WITH THE PERMISSION OF THE OWNER.
CONSTRUCTION WITHOUT UNDUE INTERRUPTION OF SERVICE MAY BE REMOVED AND REPLACED BY
UNLESS OTHERWISE INDICATED ON THE DRAWINGS.  ANY PIPING WHICH CAN BE REMOVED DURING
LOCATE AND MAINTAIN IN SERVICE ALL EXISTING UTILITIES ENCOUNTERED DURING CONSTRUCTION
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE AND ORDER ALL NEW SERVICES,2.
SPECIFICATIONS AND DETAILS OF THE APPROPRIATE PUBLIC UTILITY COMPANY.
ALL UNDERGROUND UTILITIES MUST BE INSTALLED IN ACCORDANCE WITH THE STANDARDS,1.
FINAL CONNECTION LOCATION SUBJECT TO REVIEW AND APPROVAL BY EVERSOURCE.
NEW BUILDING BY A CONNECTION TO THE EXISTING TRANSFORMER ON THE WESTERLY PROPERTY LINE.
NEW ELECTRIC & TELECOMMUNICATIONS SERVICES SHALL BE PROVIDED TO THE UTILITY ROOM IN THE1.
CONNECTICUT NATURAL GAS.
NORTHWEST CORNER OF THE SITE. CONNECTION LOCATION AND SIZE TO BE REVIEWED AND APPROVED
THE NEW BUILDING SHALL BE SERVED BY A NEW GAS CONNECTION TO AN EXISTING STUB AT THE2.
THE CONTRACTOR PRIOR TO INSTALLING GAS SERVICES.
THE LOCATION, SIZE, AND DEPTH OF ALL CONNECTION POINTS SHALL BE VERIFIED IN THE FIELD BY1.
STUBS PER MAP REF. 2 (VIF)
EXISTING 6" FIRE & 4" DOMESTIC
EXISTING GAS VALVE (VIF)
8" CLDIP WATER MAIN
12" CLDIP WATER MAIN
TOWN OF SIMSBURY.
COMPANY OF CONNECTICUT RULES AND REGULATIONS DATED JULY 31, 2024, AS AMENDED AND THE
ALL MATERIALS AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE AQUARION WATER5.
(SDR 26) PIPE WITH GASKETED, COMPRESSION-TYPE JOINTS WITHIN 10 FEET OF THE  WATER LINE.
CONSTRUCTED OF WATER WORKS GRADE DUCTILE IRON PIPE WITH MECHANICAL JOINTS OR PVC
SANITARY SEWER LINES. IF 18 INCHES OF CLEARANCE IS NOT PROVIDED THEN THE SEWER MUST BE
A MINIMUM OF 18 INCHES OF VERTICAL CLEARANCE SHALL BE PROVIDED BETWEEN NEW WATER AND4.
ALL NEW WATER LINES SHALL HAVE A MINIMUM OF 54" OF COVER.3.
CONFORM TO CLASS 52 CONFORMING TO AWWA C151.
AT THE NORTHWEST CORNER OF THE SITE TO THE UTILITY ROOM IN THE NEW BUILDING. PIPE SHALL
A NEW 4"Ø CLDIP DOMESTIC WATER SERVICE SHALL BE INSTALLED FROM THE EXISTING SERVICES STUB3.
CONFORMING TO AWWA C151.
THE SITE TO THE SPRINKLER ROOM IN THE NEW BUILDING. PIPE SHALL CONFORM TO CLASS 52
SERVICE SHALL BE INSTALLED FROM THE EXISTING SERVICE STUB AT THE NORTHWEST CORNER OF
FIRE/SPRINKLER SERVICES FOR THE CAR WASH ARE NOT REQUIRED. IF REQUIRED THE NEW FIRE2.
THE CONTRACTOR PRIOR TO ORDERING, FURNISHING, OR INSTALLING WATER SERVICES.
THE LOCATION, SIZE, AND DEPTH OF ALL CONNECTION POINTS SHALL BE VERIFIED IN THE FIELD BY1.
FL (CALC) = 190.7± (VIF)
LATERAL PER MAP REF. 2.
EXISTING 6" PVC SANITARY SERVICE
SIZE TO BE CONFIRMED BY MEP
4" DOMESTIC WATER SERVICE
T
FL (CALC) = 191.2± (VIF)
STUB PER MAP REF. 2.
EXISTING 6" PVC SANITARY
6" FL = 196.5±
6" FL = 198.0±
6" FL = 198.0±
6" FL = 198.0±
6" FL = 198.0±
ELECTRIC & TELECOMM SERVICE
GAS SERVICE
@ 0.070 FT/FT
45 LF - 8"Ø PVC (SDR35)
@ 0.083 FT/FT
26 LF - 8"Ø PVC (SDR35)
FL(OUT) = 194.25
FL(IN) = 194.35
TF = 201.25
SMH #1
FL(OUT) = 197.00
FL(IN) = 197.10
TF = 201.45
SMH #2
FL(OUT) = 197.65
FL(IN) = 197.85
TF = 201.45
SMH #3
DESIGN BY OTHERS
WATER RECOVERY SYSTEM
ADAWF, MAX. DAILY, AND PEAK DEMAND TO BE CONFIRMED BY MEP.C.
CALCULATED ADAWF = 31,940 GPDB.
WASH FACILITY IN COLCHESTER, CT WITH GROWTH FACTOR = 1.36 AND FACTOR OF SAFETY = 1.50.
AVERAGE DAILY FLOW CALCULATED BASED ON METER FLOW READINGS FROM DIAMOND SPARKLE CARA.
SANITARY SEWER FLOW CALCULATIONS:5.
POLLUTION CONTROL AUTHORITY RULES AND REGULATIONS.
ALL MATERIALS AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE TOWN OF SIMSBURY WATER4.
THE DOWNSTREAM DIRECTION OF THE MAIN SHALL BE MADE.
SEWER MAIN IS REQUIRED, A SADDLE OR OTHER APPROVED CONNECTION METHOD AT AN ANGLE OF 45° IN
DIRECT CONNECTION TO THE EXISTING SEWER STUB SHALL BE MADE. IF DIRECT CONNECTION TO THE3.
PIPE SLOPE SHALL BE 2% AND THE MAXIMUM PIPE SLOPE SHALL BE 10%
CONFORM TO ASTM D2241 AND SHALL MEET THE DEFLECTION STANDARDS OF ASTM D3303. THE MINIMUM
AN EXISTING 6" STUB IN THE 8" PVC SEWER MAIN IN THE DRIVEWAY TO THE WEST. THE PIPE SHALL
THE NEW BUILDING WILL BE SERVED BY A 6"Ø PVC (SDR 35) SANITARY SEWER LATERAL CONNECTING TO2.
THE CONTRACTOR PRIOR TO ORDERING, FURNISHING, OR INSTALLING SEWER SERVICES.
THE LOCATION, SIZE, TYPE, AND DEPTH OF ALL CONNECTION POINTS SHALL BE VERIFIED IN THE FIELD BY1.
FL = 185.09 (8")
TF = 197.39
EX. SMH
FL = 184.11 (8")
TF = 196.63
EX. SMH
TF = 193.81
EX. SMH
REMOVED OR ABANDONED
WATER PIPE STUBS TO BE
EXISTING FIRE AND DOMESTIC
250' - 8" P
V
C
 @
 0.025

Page 345

 
 
NOTES:
1. INSTALL PER MANUFACTURER
SPECIFICATIONS.
2. INSPECT PER EROSION CONTROL
NOTES OR AS DIRECTED.
3. REMOVE SEDIMENT WHEN BAG
IS HALF FULL AND DEPOSIT PER
EROSION CONTROL NOTES.
4. REPAIR OR REPLACE WITHIN 24
HOURS OF OBSERVED FAILURE.
S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
E
E
C
T
FLAG POLE
CONC. WALK
ANTI-TRACKING PAD DETAIL
SOIL STOCKPILE DETAIL
SECTIONELEVATION
SILT FENCE
INLET SEDIMENT
CONTROL DEVICE
TEMPORARY SEDIMENT TRAP (TST) SIZING
PLAN
TEMPORARY SEDIMENT TRAP
OUTLET SECTION
                            SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE:   1" =    20'
PROJECT NUMBER:
00222 - 001  
 20 0  20  40  60 
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION                       
SHEET
DATE
REVISED
 5/18/26
 6/26/26
OF   5 6   
REVISION SUMMARY
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
             DORSET CROSSING PAD            
           MASTER DEVELOPMENT PLAN          
                     PREPARED FOR                     
        DIAMOND SPARKLE CAR WASH LLC, APPLICANT       
    EROSION & SEDIMENTATION CONTROL PLAN    
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)        
38C
NRCS
38C
NRCS
38C
NRCS 34A
NRCS
34A
NRCS
34B
NRCS
198
200
200
198
200
200
200
202
201
201
201
202
201
DORSET          CROSSING          DRIVE
SEE PLAN FOR WIDTH
NOT TO SCALE
COMPACTED SUBGRADE
50'-0" MIN. LENGTH
ROAD
6" CTDOT 2" STONE
FOR LOW SOIL BEARING CAPACITY
USE MIRAFLEX 600X OR EQUAL
2 MAX
3
NOT  TO  SCALE
MATERIAL STOCKPILE
FLOW
(TYP.)
STOCKPILE (TYP.)
OF MATERIAL 
AROUND PERIMETER
SYSTEM PLACED
EROSION CONTROL 
NOT TO SCALE
FLOW
3'-0" M IN.
NOTES:
1.  INSTALL SILT FENCE & WOOD STAKES AS RECOMMENDED BY MANUFACTURER.
2. SILT FENCE SUBJECT TO HEAVY LOADS SHALL BE REINFORCED WITH FARM FENCING & STEEL 
POSTS (0.5 # STEEL/L.F.).  THE MINIMUM POST LENGTH SHALL BE 5'-0".
3. SILT FENCE FABRIC SHALL BE A PERVIOUS SHEET OF WOVEN PROPYLENE, NYLON, POLYESTER
OR POLYETHYLENE FILAMENTS AND SHALL BE CERTIFIED BY THE MANUFACTURER OR SUPPLIER.
2'-6" M
IN
.
12" M
IN
.
100°
10'-0" MAX.
 
6" M IN.
GRADE
FINISH
GRADE
FINISH
FENCE (SEE NOTE 2)
ATTACHED TO WIRE
SILT FENCE FABRIC
SELF-SUPPORTING
BACKFILL
RECOMPACTED 
GROUND
FABRIC BELOW
EXTEND 6" OF
(MIN. LENGTH: 3' - 6')
1" x 2" WOOD STAKE
NOT TO SCALE
DUMPING STRAPS
STORM GRATE CURB OPENING
SILT SACK
LIFT STRAPS
CURB FILTER
PORTS
OUTFLOW
OPTIONAL
CT DOT #3 STONE
GEOTEXTILE FABRIC
MODIFIED RIPRAP
HAYBALES
DIVERTED RUNOFF
OUTLET
NOT TO SCALE
W
L
VARIES2'
1' M IN.
5' M AX.
1.5
1
1
2
1
2
2
1
WEIR
SOIL BERM
TST AREA (AC) REQUIRED WET VOL. DRY VOL.
(ACRE) VOL. (CY) (CY) (CY)
1 1 134 67 67
18" DRY VOLUM E
18" W ET VOLUM E
Mixed Use Retail/Medical Office
Total 15,000 Square Feet
1 Story
BUILDING #2
FF = 201.50
CAR WASH
1 STORY
BUILDING #1
8" CLDIP WATER MAIN
T
250' - 8" P
V
C
 @
 0.025
GENERAL CONSTRUCTION NOTES
SEQUENCE OF CONSTRUCTION
E & S CONTROL NARRATIVE
EROSION & SEDIMENT CONTROL PLAN
E & S CONTROL NOTES
INSPECTION AND MAINTENANCE
SIMSBURY AND THE STATE OF CONNECTICUT.
THE CONTRACTOR SHALL CONFORM TO ALL REQUIREMENTS OF ALL LOCAL AGENCIES OF THE TOWN OF2.
TO BE PERFORMED.
THE CONTRACTOR IS REQUIRED TO OBTAIN ALL NECESSARY LOCAL AND STATE PERMITS FOR THE WORK1.
REMOVE E&S CONTROLS WHEN PERMANENT VEGETATIVE COVER IS ESTABLISHED.11. 
FINISH GRADE, SPREAD TOPSOIL, SEED, AND COMPLETE PLANTING.10.
INSTALL BITUMINOUS CONCRETE & CURBING.9. 
CONSTRUCT ACCESS DRIVES, PARKING AREAS & WALKS.8.
INSTALL UTILITIES AND STORM DRAINAGE.7.
INSTALL FOUNDATION & ERECT BUILDING.6.
EXCAVATE, PLACE FILL AND ROUGH GRADE SITE.5.
STRIP & STOCKPILE TOPSOIL. EXPORT EXCESS TOPSOIL AS REQUIRED.4.
ABANDON AND/OR REMOVE UTILITIES AS REQUIRED.3.
FOR FIELD CONDITIONS.
INSTALL EROSION CONTROL MEASURES AT THE LOCATIONS SHOWN ON THE PLANS OR AS REQUIRED2.
COORDINATE A MEETING WITH TOWN AND OWNER. RESPONSIBLE PARTIES TO BE IDENTIFIED.1.
CONSTRUCTION UNTIL DISTURBED AREAS ARE STABILIZED.
FEATURES, MINIMIZE SOIL DISTURBANCE, AND MAINTAIN E&S CONTROLS FOR THE DURATION OF
WITHIN THE DEVELOPMENT AREA. THE CONTRACTOR SHALL TAKE CARE TO PRESERVE SURROUNDING
THE TOPOGRAPHY CONSISTS OF GENTLY SLOPING TERRAIN, WITH SLOPES RANGING FROM 2% TO 5%2.
MEASURES SHALL BE EMPLOYED AS REQUIRED, SUCH AS COVERING STOCKPILES OR APPLYING WATER.
TO WIND-BLOWN EROSION. LONG-TERM EXPOSURE OF THESE SOILS SHALL BE AVOIDED.  DUST-CONTROL
MODERATE SUSCEPTIBILITY TO SHEET AND RILL EROSION AND A MODERATE TO HIGH SUSCEPTIBILITY
MERRIMAC FINE SANDY LOAM TO THE EAST. USDA IDENTIFIES THE SOILS AS HAVING A LOW TO
PER USDA NRCS SOIL MAPPING, THE SITE CONSISTS OF HINCKLEY LOAMY SAND TO THE WEST AND1.
CONCERNS & ISSUES SHALL BE NOTED:
DEPICTED ON THIS SHEET SHALL BE FOLLOWED.  IN ADDITION THE FOLLOWING SITE SPECIFIC E&S CONTROL
THE EROSION & SEDIMENTATION CONTROL NOTES, INSPECTION REQUIREMENTS, PLANS, AND DETAILS
ARE COMPLETED. 
STABILIZATION OF THE SITE WILL OCCUR IN SEQUENCE AS THE BUILDING AND SURROUNDING IMPROVEMENTS
SEDIMENTATION. PHASING OF MASS EARTH WORK IS NOT REASONABLE DUE TO THE LIMITED SIZE OF THE SITE.
MINIMIZES THE AREA, LIMIT AND TIME SOILS ARE EXPOSED TO RAIN AND WIND AND SUBJECT TO EROSION &
PART OF THE WORK, INCLUDING CONNECTION TO THE EXISTING PAVED DRIVEWAY TO THE WEST. THE PLAN
THE EXISTING PARCEL IS APPROXIMATELY 1.08 ACRE.  APPROXIMATELY 1.1 ACRES WILL BE DISTURBED AS
IMPROVEMENTS. THE GENERAL SCOPE OF WORK IS DESCRIBED ABOVE IN THE CONSTRUCTION SEQUENCE. 
THE PROPOSED PROJECT CONSISTS OF THE CONSTRUCTION OF A CAR WASH FACILITY AND ASSOCIATED SITE
AND SWALES SHALL BE MAINTAINED TO CONTROL RUNOFF AND PREVENT SEDIMENT DISCHARGE.
PUBLIC ROW AND INFILTRATION SHALL BE MAINTAINED. AT ALL TIMES DURING CONSTRUCTION, THE TST'S
DIRECTED TO THE TST'S. CONSTRUCTION WASTEWATERS SHALL NOT DISCHARGE DIRECTLY TO THE
DURING SITE CONSTRUCTION. ALL DEWATERING DISCHARGE AND CONSTRUCTION RUNOFF SHALL BE
TEMPORARY SILTATION TRAPS (TST) AND DIVERSION SWALES SHALL BE INSTALLED AS NECESSARY7.
DUST CONTROL MEASURES SHALL BE APPLIED THROUGHOUT THE CONSTRUCTION PERIOD. 6.
AN EROSION CONTROL SYSTEM SHALL BE INSTALLED AROUND ALL STOCKPILES OF SOIL.5.
BASINS ON SITE SHALL BE SURROUNDED WITH STRAW WADDLES OR BALES.  
SACKS AS SHOWN ON THE PLAN THROUGHOUT THE CONSTRUCTION PERIOD. IF REQUIRED, NEW CATCH
ALL CATCH BASINS WITHIN THE PROJECT AREA SHALL BE PROTECTED WITH INLET CONTROL FILTER SILT4.
TRAFFIC. THE SURROUNDING ROAD SURFACES SHALL BE SWEPT DAILY OR AS REQUIRED.
TO PREVENT THE TRANSPORT OF SEDIMENTS OFF THE CONSTRUCTION SITE BY TRUCKS AND EQUIPMENT
AN ANTI-TRACKING APRON WILL BE INSTALLED AT ALL ENTRANCES TO THE CONSTRUCTION SITE IN ORDER3.
CONSTRUCTION WHEREVER POSSIBLE.
ALL EROSION AND CONTROL MEASURES SHALL BE INSTALLED AT THE PROJECT SITE PRIOR TO2.
EMERGENCY CONTACT: TO BE PROVIDED PRIOR TO ISSUANCE OF BUILDING PERMIT
PARTY RESPONSIBLE FOR E&S CONTROL PLAN: DIAMOND SPARKLE CAR WASH, LLC1.
100 LBS. PER ACRE.
TEMPORARY GRASS SEEDING, IF NECESSARY, SHALL BE PERENNIAL RYE GRASS APPLIED AT A RATE OF11.
ACRE OR AS RECOMMENDED BY THE SEED MANUFACTURER.
GRASS SEED MIXTURES SHALL BE TALL FESCUE BLEND APPLIED AT A RATE NO LESS THAN 100LBS PER10.
SPRING: APRIL 15 TO JUNE 15, FALL: AUGUST 15 TO SEPTEMBER 15
THE FOLLOWING DATES FOR SEEDING SHALL BE USED:9.
AREAS OUTSIDE OF IMPERVIOUS AREAS TO RECEIVE A MINIMUM 4" OF TOPSOIL.8.
IN CTDOT FORM 819 OR AS DIRECTED BY THE LANDSCAPE ARCHITECT.
ALL DISTURBED AREAS ARE TO BE RAKED, SEEDED AND FERTILIZED PER "TURF ESTABLISHMENT" SPEC.7.
THESE PLANS OR AS DIRECTED BY THE ENGINEER OR TOWN.
THE CONTRACTOR WILL BE RESPONSIBLE FOR IMPLEMENTING ALL E&S CONTROL DEVICES AS SHOWN ON6.
IS CONSISTENT WITH THE INTENT OF THE PLAN.
SEDIMENT REMOVED FROM ANY CONTROL STRUCTURES SHALL BE DISPOSED OF IN A MANNER WHICH5.
DURING THE CONSTRUCTION PERIOD AS NECESSARY OR REQUIRED BY THE ENGINEER OR THE TOWN.
EROSION CONTROL DEVICES SHALL BE MAINTAINED, REPLACED AND/OR ADDED BY THE CONTRACTOR4.
DATED 2023, AS AMENDED AND THE TOWN OF SIMSBURY REGULATIONS.
SPECIFICATIONS OF THE "CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL",
ALL E&S CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE STANDARDS AND3.
E&S CONTROL MEASURES SHALL BE INSTALLED PER THE PLANS, OR AS DIRECTED BY THE TOWN.2.
CONSTRUCTION IS ANTICIPATED TO START IN FALL 2026 AND BE COMPLETED IN 2027.1.
ALL STORMWATER STRUCTURES SHALL BE CLEANED AFTER REMOVAL OF E&S CONTROLS.6.
 THE HEIGHT (MAX.)2 1STRAW BALES - REMOVE COLLECTED SEDIMENT @ iv.
SILT SACKS - CLEAN PER MANUFACTURER'S RECOMMENDATIONSiii.
 THE HEIGHT (MAX.)2 1SILT FENCE - REMOVE COLLECTED SEDIMENT @ ii.
ANTI-TRACKING APRON - REPLENISH OR REPLACE STONE SA REQUIREDi.
TEMPORARY CONTROLS SHALL BE INSPECTED WEEKLY AND CLEANED:B.
INSPECT ROAD DAILY AND SWEEP/REMOVE TRACKED MATERIALS AS REQUIREDA.
ROUTINE INSPECTION AND MAINTENANCE SCHEDULE:5.
 CAPACITY2 1DEWATERING BASINS - REMOVE COLLECTED SEDIMENT @ C.
 DEPTH4 1SWALES - REMOVE COLLECTED SEDIMENT @ B.
 DEPTH OF SUMP2 1CATCH BASINS - REMOVE COLLECTED SEDIMENT @ A.
GREATER THAN 0.1 INCHES AND CLEANED AS FOLLOWS:
ALL STORMWATER STRUCTURES SHALL BE INSPECTED WITHIN 24 HOURS AFTER RAINFALL EVENTS4.
AFTER RAINFALL EVENTS GREATER THAN 0.1 INCHES
ALL E&S CONTROLS SHALL BE INSPECTED, REPAIRED, AND CLEANED IF NECESSARY WITHIN 24 HOURS3.
CLEANED TO ENSURE THEY ARE IN PROPER WORKING ORDER.
CONDITIONS OR EFFECTS, ALL E&S CONTROLS SHALL BE INSPECTED, MAINTAINED, REPAIRED AND/OR
PRIOR TO A MAJOR STORM IN WHICH THE NOAA ISSUES WARNINGS OF FLOODING, SEVERE WEATHER2.
THE RESPONSIBLE PARTY SHALL PERFORM ROUTINE INSPECTIONS BASED ON THE FOLLOWING.1.
THE SITE IS STABILIZED.
RESPONSIBLE PARTY SHALL IMPLEMENT THE FOLLOWING THROUGHOUT THE CONSTRUCTION PERIOD UNTIL
REGULAR INSPECTION AND MAINTENANCE IS CRITICAL FOR THE EFFECTIVENESS OF E&S CONTROLS. THE
SWEPT AS REQUIRED
ROADWAY TO BE
APRON
ANTI-TRACKING
WET VOLUME = 67 CY
DRY VOLUME = 67 CY
TST #1
STOCKPILE
TOPSOIL
AROUND ALL BASINS (TYP.)
DEVICE TO BE INSTALLED
INLET SEDIMENT CONTROL
BOUNDARIES OR AS SHOWN (TYP.)
NORTH, EAST & SOUTH PROPERTY
SILT FENCE TO BE INSTALLED ALONG
DIVERSION SWALE TO WEST
WALL OF EX. CATCH BASIN
DISCHARGE INTO ORIFICE IN NORTH
STONE & RIPRAP WEIR FROM TST TO

Page 346

S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
WG
S
S
GG
S
?
2622
CL&P
2623
CL&P
2623S
CL&P
ELEV.=198.71
E 989669.19
N 891545.09
P.K. NAIL
CP#19068
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
E
E
C
C
T
FLAG POLE
ELEV.=204.26
E 989309.93
N 891321.88
REBAR
CP#173
D
CONC. WALK
SET
MON.'S
SET
MON.
SET
MON.
SET
MON.
SET
MON.
SET
MON.
connection (typ.)
access/roadway 
Possible future 
connection (typ.)
access/roadway 
Possible future  
Mixed Use Retail/Medical Office
Total 15,000 Square Feet 1 Story
BUILDING #2
13A
Signal
Traffic
NOTES:
LIGHT POLE & BASE
                            SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE:   1" =    20'
PROJECT NUMBER:
00222 - 001  
 20 0  20  40  60 
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION                       
SHEET
DATE
REVISED
 5/15/26
 6/26/26
OF   6 6   
REVISION SUMMARY
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
             DORSET CROSSING PAD            
           MASTER DEVELOPMENT PLAN          
                     PREPARED FOR                     
        DIAMOND SPARKLE CAR WASH LLC, APPLICANT       
                LIGHTING PLAN               
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)        
LP
L
P
L
P
LP
LP
L
P
L
P
LP
LP
LP
LP
LP
DORSET          CROSSING          DRIVE
H
O
P
M
E
A
D
O
W
 S
T
R
E
E
T
 (C
T
 R
O
U
T
E
 10 &
 202)
NOT TO SCALE
1.  CLASS "F" CONCRETE CTDOT 816
2. REINFORCEMENT NOT SHOWN FOR
CLARITY. GRADE 60.
3. ANCHOR BOLTS HOT DIPPED GALVANIZED.
DIAMETER, PROJECTION EMBEDMENT, 
    LOCATION PER LIGHT POLE MANUAL.
4. EXTERIOR LAMP, BASE & POST SHALL BE
COORDINATED WITH TOWN, OWNER, &
ELECTRICAL CONTRACTOR
CONDUIT
2" DIA. PVC
GRADE
FINISH
1" CHAMFER
(TYP. OF 2)
2" DIA. PVC SWEEP
GROUND ROD
1" DIA. PVC FOR
(SEE NOTE 3)
ANCHOR BOLT
MANUFACTURER
PER LIGHT POLE
BOLT  PATTERN AS
24" DIA.
24" Ø
6"42"
DISTRIBUTION AS SPECIFIED
LIGHT FIXTURE OR EQUAL
LUMARK 'PRV-C15-D-UNV'
COOPER LIGHTING SOLUTIONS
15' M
O
U
N
T
IN
G
 H
E
IG
H
T
 A
B
O
V
E
 B
A
S
E
LIGHTING STATEMENT
LIGHTING NOTES
LUMINAIRE SCHEDULE
ARRANGEMENTDESCRIPTIONLABELQUANTITYSYMBOL
DOUBLEPRV-C15-730-D-UNV-T4-SA-BKT4A0
SINGLEPRV-C15-730-D-UNV-T4-SA-BK-HSST4HSS12
SINGLEPRV-C15-730-D-UNV-T4-SA-BKT40
T4HSS
T4HSS
T4HSS
T4HSS
T4HSS
T4HSS
T4HSS
0.1 fc
0.1 fc
0.1 fc
0.1 fc
0.1 fc
0.1 fc
0.2 fc
0.2 fc
0.2 fc
0.2 fc
0.2 fc
0.5 fc
0.5 fc
0.5 fc
0.5 fc
0.5 fc
1.0 fc
1.0 fc
1.0 fc
1.0 fc
1.0 fc
2.0 fc
2.0 fc
2.0 fc
2.0 fc
E
X
IS
T
IN
G
 D
R
IV
E
W
A
Y
AREA = 7,275 SF±
CAR WASH
1 STORY
BUILDING #1
CANOPY
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
ISOLINE CONTOUR (TYP.)
ISOLINE VALUE (TYP.)
T4HSS
T4HSS
T4HSS
T4HSS
T4HSS
0.2 fc
T4HSS
INTERNAL SITE LIGHTING AT COMMON LOT LINES IS IN HARMONY WITH THE APPROVED PAD DEVELOPMENT.
A MAXIMUM ILLUMINATION VALUE OF 0.5 FC HAS BEEN MET AT THE DORSET CROSSING ROW (SOUTH).2.
PROPERTY LINES HAVE NOT BEEN CONSIDERED IN THE ANALYSIS.
BUILDING MOUNTED LIGHTING OR EXISTING POLE MOUNTED FIXTURES ALONG THE NORTH, WEST, AND SOUTH
OF 0.5 TO 2.0 FC FOR DRIVES, PARKING AREAS AND PEDESTRIAN WALKS SERVING THE BUILDING ENTRANCES.
SOCIETY. MINIMUM HORIZONTAL ILLUMINATION LEVELS OF 0.2 FC ARE PROPOSED WITH A TYPICAL RANGE
DEVELOPMENT AND GENERALLY MEETS THE RECOMMENDATIONS OF THE ILLUMINATING ENGINEERING
EXTERIOR LIGHTING HAS BEEN DESIGNED FOR A SUBURBAN COMMERCIAL USE WITHIN AN APPROVED PAD1.
PHOTOMETRIC PLAN.
CANOPY LIGHTS WILL BE DARKSKY APPROVED OR MOUNTED IN THE CEILING. NOT INCLUDED IN
SEE ARCHITECTURAL PLANS FOR BUILDING AND CANOPY MOUNTED LIGHTING. ALL BUILDING AND4.
LEVELS SET TO 25% OF DESIGN VALUES.
LIGHTING WITHIN 15 MINUTES OF NO ACTIVITY SHALL HAVE REDUCED POWER OUTPUT AND ILLUMINATION
SECURITY AND SAFE VEHICULAR CIRCULATION THROUGH THE SITE FOR USE OF THE SELF-SERVE BAYS.
TIMERS, PHOTOCELLS, OR MOTION SENSORS TO REDUCE LIGHTING TO THE MINIMUM NECESSARY FOR
ARE CLOSED, ALL NON-ESSENTIAL LIGHTING FIXTURES SHALL BE CONTROLLED MANUALLY OR WITH
THE SELF-SERVE BAYS ARE OPEN 24 HOURS. WHEN THE AUTOMATIC TUNNEL AND TOUCHLESS BAYS3.
POLE-MOUNTED = 15' FIXTURE HEIGHTA.
FIXTURE MOUNTING HEIGHTS:2.
THAN 10° OF TILT.
PREVAIL LED IS DARKSKY APPROVED FOR 3000K CCT AND WARMER, WITH MOUNTING OPTIONS LESS
OF LIGHT AND GLARE ON ADJACENT PROPERTIES AND ROADWAYS. THE SELECTED FIXTURE LUMARK
ALL SITE LIGHTING SHALL BE FULL CUT-OFF OF SHIELDED TYPE TO PREVENT UPWARD DISTRIBUTION1.

Page 347

Page 348

1
Diamond Sparkle Car Wash at Dorset Crossing 
Master Plan Change, Text Amendment, and Site Plan
This is the final step of the three-part process for approving a new use in the Dorset Crossing 
Planned Area Development (PAD) zone.
The proposal is to amend the Master Development Plan at Dorset Crossing and approve a site 
plan to enable development of a car wash at 10 Dorset Crossing, (Assessor’s Map Block Lot I04 403 
13C-F), Planned Area Development (PAD) zone. The parcel is known as Lot F.
In 2013, Dorset Crossing was approved as a Planned Area Development (PAD) with a mix of 
commercial and residential uses. The project mix was amended in 2022 and 2023 and currently allows 
27,000 sq. ft. of commercial and 360 multi-family residential homes.
The application proposes to amend the PAD zoning for “Lot F” to replace the current two- 
building, 12,000 sq. ft. of “retail/office” concept (approved but never developed) with a substantially 
smaller 7,275 sq. ft. car wash facility. 
A car wash is a permitted use as required by Section 8.1C of the PAD regulations: 
A. Permitted Uses
Any use(s) permitted as of right or by Special Permit or Special Exception in the Simsbury Zoning 
Regulations are eligible for inclusion in a PAD and may be permitted in a Planned Area 
Development Zone. Such uses may be combined in a Mixed Use Development in accordance with 
the Development Plan Standards set forth in this Section.

Page 349

2
The car wash use is a marked improvement over the current approved use in nearly every  
respect:
1. The access plan will eliminate the curb cut on Dorset Crossing Drive, 
eliminating the conflict in turning movements with the existing driveway.
2. The impervious surface is reduced by nearly 12%.
3. The number of parking spaces required is greatly reduced. 
4. The landscaping will have 100% native vegetation. 
5. The side yard in the current use is 9 feet; the proposed use has over 50 feet.  
6. The front yard for the building in the current approved use is a scant 9 feet; 
the  car wash is 60 feet, nearly 7 times greater.
7. The building area is reduced by over 40%.
8. Even with the proposed hotel, on the adjacent parcel, the combined 
development traffic is still below the original approved peak hour volumes 
of the originally approved development
The proposed car wash is consistent with the Plan of Conservation and Development and 
meets the demand in market area of a car wash utilizing the latest technology and providing unequaled 
customer service.  It is an important and needed use for the many, and an increasing number of, 
residents in Simsbury living in multifamily developments. 
And, finally, and perhaps of overarching merit for this proposal, is the design, not only in the 
site engineering aspects noted above in terms of reducing the impact over the existing, approved use 
of Lot F, but the exceptionally attractive architectural design by a preeminent area firm, decidedly not 
the typical “out-of-the-box” design that comes with the car wash franchise operations with hundreds 
of the same car washes, all the same.  This unique, site-specific, sensitive to its neighbors, and 
technology supporting design is nonpareil.
June 30, 2026

Page 350

Page 351

3 - 2 6 - 2 6
 3 - 2 6 - 2 6

Page 352

Hartford Sign&Design
Hartford Sign&Design
70 Hopmeadow, Weatogue CT
Extra Space
70 Hopmeadow St, Weatogue CT
Craig Foreman
922 Davis St, Ste 3N
Evanston, IL 60201
craig@newcoastre.com
773-308-5500

Page 353

 
 
 
 
 
 
 
 
 
 
 
To: DRB  MARCH 27 2026  
Re:EXTRA SPACE STORAGE    
 
 
 
 
A brownstone panel base monument sign is proposed for the location approved by the town on 
Hopmeadow Rd near Old Meadow Plain Rd. 
 
Also a non-illuminated, 45” x 99.5” ACM sign replaces a similarly sized sign from the previous occupant. 
It will be attached to the building with 3/8” x 3” tech screws. 
A vinyl label “OFFICE” will be applied to the glass window next to the entry door. 
 
 
Thank you, 
Gerian Williams  
Permitting Tech  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
`328 Governor Street, East Hartford, CT 06108 • 860.293.1824 

Page 354

SIGNAGE  |  BRANDED ENVIRONMENTS  |  MAINTENANCE
Project No. 65798
Extra Space Storage
70 Hopmeadow St
Weatogue, CT 06089
Location: 5041 

Page 355

W.O.
 
N
o
.
Address
City, ST
O
r
i
g
. 
D
r
a
f
t
Project Mg
r.
Designer
Rev. Art
R
e
v
. 
D
a
t
e
P
a
g
e 
R
e
v
.
THIS SIGN DESIGN IS EXCLUSIVE PROPERTY OF IDENTITI RESOURCES, LTD., AND IS THE RESULT OF THE ORIGINAL AND CREATIVE WORK OF IT’S
 EMPLOYEES. THIS DRAWING IS SUBMITTED TO THE CUSTOMER FOR THE SOLE PURPOSE OF PURCHASE OF THE DESIGN OR SIGNAGE MANUFACTURED TO
 THIS DESIGN, BY IDENTITI RESOURCES, LTD. DISTRIBUTION TO OR USE OF THIS SIGN DESIGN BY ANYONE OUTSIDE OF THE CUSTOMER’S ORGANI
ZATION, WITHOUT EXPRESSED, WRITTEN AUTHORIZATION BY IDENTITI RESOURCES, LTD. IS PROHIBITED.
Sign Type:
2000 Center Drive
Suite C411
Hoffman Estates, IL 60192
Office 847.301.0510
identiti.net
Plan View:
Exterior
Site Plan
North
YP
03.24.2026
005
65798
70 Hopmeadow St
Weatogue, CT 06089
11.27.2025
Schyler Chilton
NJL
Customer
LEGEND
P1
Post & Panel
S1
Front Elevation
S2
Front Elevation
SIGNAGE CRITERIA
Code:
Wall signs shall not exceed two-third (2/3) of the 
length of the building frontage, but in no case, shall 
exceed 32sq ft
Landlord restrictions:
N/A
NTE 32 SF (Allowed)
N/A
S1
NTE 32 SF (Allowed)
S2
P1
P1
S2
S1

Page 356

W.O. No.
Address
City, ST
Orig. Draft
Project Mgr.
Designer
Rev. Art
Rev. Date
Page Rev.
Color Palette
THIS SIGN DESIGN IS EXCLUSIVE PROPERTY OF IDENTITI RESOURCES, LTD., AND IS THE RESULT OF THE ORIGINAL AND CREATIVE WORK OF IT’S EMPLOYEES. THIS DRAWING IS SUBMITTED TO THE CUSTOMER FOR THE SOLE PURPOSE OF PURCHASE OF THE DESIGN OR SIGNAGE MANUFACTURED TO THIS DESIGN, BY IDENTITI RESOURCES, LTD. DISTRIBUTION TO OR USE OF THIS SIGN DESIGN BY ANYONE OUTSIDE OF THE CUSTOMER’S ORGANIZATION, WITHOUT EXPRESSED, WRITTEN AUTHORIZATION BY IDENTITI RESOURCES, LTD. IS PROHIBITED.
Sign Type:2000 Center Drive
Suite C411
Hoffman Estates, IL 60192
Office 847.301.0510
identiti.net
EG
12.18.2025
001
65798
70 Hopmeadow St
Weatogue, CT 06089
11.27.2025
Schyler Chilton
NJL
Signage:
ACM Panel w/ Applied Vinyl;
Flush mounted to wall 
N/A
N/A
SCALE: 1/2” = 12”
Front Elevation
S1-1
3M 3660M Matte Overlaminate
Trans. UV Protectant Film
3M 3630-106 Brilliant Green
Face: White ACM Panel 3M 3630-22 Black
EXISTING PROPOSED ALLOWED SF: 32
PROPOSED SF: 31.09
360.00"
(30'-0")
±70.375"
(5'-10 3/8")
±51.875"
(4'-3 7/8")
99.50"
(8'-3 1/2")
45.00"
(3'-9")
26.750"
(2'-2 3/4")
EQ
EQ
EQ EQ

Page 357

W.O. No.
Address
City, ST
Orig. Draft
Project Mgr.
Designer
Rev. Art
Rev. Date
Page Rev.
Color Palette
THIS SIGN DESIGN IS EXCLUSIVE PROPERTY OF IDENTITI RESOURCES, LTD., AND IS THE RESULT OF THE ORIGINAL AND CREATIVE WORK OF IT’S EMPLOYEES. THIS DRAWING IS SUBMITTED TO THE CUSTOMER FOR THE SOLE PURPOSE OF PURCHASE OF THE DESIGN OR SIGNAGE MANUFACTURED TO THIS DESIGN, BY IDENTITI RESOURCES, LTD. DISTRIBUTION TO OR USE OF THIS SIGN DESIGN BY ANYONE OUTSIDE OF THE CUSTOMER’S ORGANIZATION, WITHOUT EXPRESSED, WRITTEN AUTHORIZATION BY IDENTITI RESOURCES, LTD. IS PROHIBITED.
Sign Type:2000 Center Drive
Suite C411
Hoffman Estates, IL 60192
Office 847.301.0510
identiti.net
EG
12.18.2025
001
65798
70 Hopmeadow St
Weatogue, CT 06089
11.27.2025
Schyler Chilton
NJL
Scale: 3” = 12”
7.00 in
28.75 in
2'-4 3/4"
3/8”
ESS.FCO1.LIN.W.7
EXISTING PROPOSED ALLOWED SF: 32.00
PROPOSED SF: 1.40
360.00"
(30'-0")
±70.375"
(5'-10 3/8")
±51.875"
(4'-3 7/8")
Signage:
3/8” Acrylic FCOs 
VHB mounted to glass
FCO Acrylic Letters
S2N/A N/A
N/AN/A
N/ACopy: White Acrylic
C/L

Page 358

W.O.
 
N
o
.
Address
City, ST
O
r
i
g
. 
D
r
a
f
t
Project Mg
r.
Designer
Rev. Art
R
e
v
. 
D
a
t
e
P
a
g
e 
R
e
v
.
Color Palette
THIS SIGN DESIGN IS EXCLUSIVE PROPERTY OF IDENTITI RESOURCES, LTD., AND IS THE RESULT OF THE ORIGINAL AND CREATIVE WORK OF IT’S
 EMPLOYEES. THIS DRAWING IS SUBMITTED TO THE CUSTOMER FOR THE SOLE PURPOSE OF PURCHASE OF THE DESIGN OR SIGNAGE MANUFACTURED TO
 THIS DESIGN, BY IDENTITI RESOURCES, LTD. DISTRIBUTION TO OR USE OF THIS SIGN DESIGN BY ANYONE OUTSIDE OF THE CUSTOMER’S ORGANI
ZATION, WITHOUT EXPRESSED, WRITTEN AUTHORIZATION BY IDENTITI RESOURCES, LTD. IS PROHIBITED.
Sign Type:
2000 Center Drive
Suite C411
Hoffman Estates, IL 60192
Office 847.301.0510
identiti.net
EXISTING
PROPOSED
ALLOWED SF: N/A
PROPOSED SF: 32
70
4.00"
17.50"
(1'-5 
1
/
2
")
17.50"
(1'-5 
1
/
2
")
96.00"
(8'-0")
48.00"
(4'-0")
2"
3"
3"
3"
90.00"
(7'-6")
18.00"
(1'-6")
18.00"
(1'-6")
132.00"
(11'-0")
Signage:
Post & Panel
P1-3
(Qty. 2)
ACM 
P
anel with 
A
pplied
V
in
y
l
; 
Mounted Between Post
Posts set in Concrete/Stone Base
SCALE: 1/2” = 12”
65798
70 Hopmeadow St
Weatogue, CT 06089
11.27.2025
Schyler Chilton
NJL
Primary Panel: White Substrate TBD
Base: Brownstone Paneling
Posts: White
Keyline Border: Color TBD
NEIGHBORING TENANT
“ESS” ACM Panel: SW 6923 Festival Green
“ESS” Vinyl: 3M 7725-10 White
“ESS” Vinyl: 3M 7725-12 Black
70
96.00"
(8'-0")
YP
03.24.2026
005
REQUIRED FOR NEW BASE STRUCTURE
FOUNDATION, ENGINEERING, PERMITTING
 
finished with brownstone paneling to match local standard 
BASE CONSTRUCTION:  Fabricated sheet metal shroud around leg base,
 
Construction of new base/monument signage at approved site
Scope Of work:

Page 359

 
 
 
 
Marc S. Nelson, MPA George K. McGregor, AICP 
Town Manager  Director 
 
 
 
PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT 
 
1 
 
STAFF REPORT MEMORANDUM 
 
To:  Simsbury Design Review Board 
From: Joseph Hollis, CZEO 
Date:  April 6, 2026 
Subject: Zoning Compliance Review of NRE Simsbury TIC 1, LLC a.k.a. 
Craig Forman, Owner; Darin Senna, Applicant, for sign permit to 
install one ± 31s.f. wall sign and one ± 1 s.f. window sign for the tenant 
fit out of Extra Space Storage at 70 Hopmeadow Street (Map Block Lot 
E18 117 001-2A), Simsbury, Zone I-1/PAD. 
 
 
Background 
 
The Zoning 
Compliance Review 
has been submitted 
by Craig Forman on 
behalf of NRE 
Simsbury T1C, LLC 
for new tenant 
signage for Extra 
Space Storage at the 
former Talcott 
Mountain Self 
Storage Site on 
Hopmeadow Street.   
 
 
The parcel is 10.6899 acres and is situated near the Avon/Simsbury town line off of 
Tower Drive.  
 
The freestanding sign that was included in the application materials will be part of 
a future application and is not part of this zoning compliance application. 
 

Page 360

 
2 
 
Staff Analysis 
 
The 31s.f. wall sign replaces an existing wall sign for the former tenant. The sign 
construction is comprised of a polycarbonate substrate with multi layered vinyl 
graphics sealed with a matte overlaminate protectant film. There are no changes to 
location or lighting proposed. 
  
 
 
The 1s.f. window sign is a white vinyl graphic that will be applied to the window 
near the business office.  
 
 
 
Staff finds the proposal is consistent with the Simsbury Zoning Regulations and the 
Guidelines for Community Design. 
  
 
 
 

Page 361

 
3 
 
Draft Motion 
 
MOVED, the Design Review Board submits a positive referral for the Zoning 
Compliance Review of NRE Simsbury TIC 1, LLC a.k.a. Craig Forman, Owner; 
Darin Senna, Applicant, for sign permit to install one ± 31s.f. wall sign and one ± 1 
s.f. window sign for the tenant fit out of Extra Space Storage at 70 Hopmeadow 
Street (Map Block Lot E18 117 001-2A), Simsbury, Zone I-1/PAD. The referral is 
based on the following conditions: 
 
1. The project shall be developed in substantial conformance with the sign plan 
titled, “Extra Space Storage” prepared by Identiti Resources, LTD, stamped 
received by the Simsbury Planning Department on March 27, 2026. 
 
2. Staff can approve minor modifications to the approved plans prior to 
implementation in the field. 
 
 

Page 362

Page 363

Page 364

Page 365

Elec.
Light
Light
Light
Light
18" Sycamore
Bank
Directory
Sign
8' Shrub
8" Catalpa
14" Sycamore
Shrub
Bank
Directory
Sign
Business
Sign
18" Maple
CB
TF=174.20
Mailbox
RL
RL
RL
RL RL
Stop
Sign
CB
TF=171.44
CB
TF=170.97
Elec
Meter
RLRL Spigot
Business
Sign
Traffic
Sign
Elec.
20" Maple
RL
RL
Shrub
6" Pear
8" Pine
8" Pine
12" Pine
RL
6" Dogwood
Stop/Do Not
Enter Sign
18" Sycamore
18" Sycamore
24" Sycamore
16" Sycamore
22" Sycamore
Stop/Do Not
Enter Sign
San MH
TF=171.62
CB
TF=170.55
CB
TF=170.62
Shrub
Shrub
Shrub
Light
Light
Light
Irr. Box
Bank
Directory
Sign
HC
Sign HC
Sign
H/C
Bollard
H/C
Bollard
Light
Light Elec.
Elec.
Elec.
Gas
Meter
H/C
Button
8" W INV=162.17
8" N INV=161.46
8" S INV=161.36
12" S INV=167.40
12" N FL=167.33
12" S FL=167.05
CB
TF=169.96
Eversource
164
Eversource
163
24" W FL=162.58
24" E FL=162.81
12" N FL=163.48
24" W FL=162.93
24" W FL=160.91
24" E FL=160.73
24" E FL=161.40
24" W FL=160.96
INV=160.15
CB
TF=167.36
Storm MH
TF=168.30
Storm MH
TF=168.23
CB
TF=167.80
AT&T MH
San MH
TF=169.65
6" N INV=161.13
8" NW INV=160.67
8" SE INV=160.57
Speed
Sign
Tel.
Irr. Box
Elec.
6" Pine
6" Pine
8" Pine
8" Pine
Street
Sign
Traffic Light
Support
Elec.
Elec.
Traffic
Sign
Business
Sign
Light
Light
Light
Light Light
Flag
Pole
Bike
Rack
San MH
TF=168.57
WG
WGWG
WG
IR
MonN44°57'07"E
27.88'
N44°57'07"E
273.15'
S42°32'20"E
217.27'
S45°05'50"W
22.43'
S37°46'18"W
248.01'
S82°59'17"W35.22'
N51°47'44"W
112.58'
Δ=31°18'28" R =214.76 FT L=117.35 FT T=60.18 FT
Sidewalk
Step
A/C
Gravel
A/C
Gravel
Gravel
Sidewalk
Sidewalk
Sidewalk
Step
Step
Gen
Hedge
Hedge
Pad
Trees
Memorial
Stone
Drive-Thru
Structure
ATM
Woods
Bike
Rack
Building
FF=173.45
Building
FF=175.95
Grass
Grass
Grass
Grass
Sidewalk
Sidewalk
Sidewalk
Porch
Steps
Planting Bed
Planting Bed
Planting Bed
Planting Bed
Paved Parking
Paved Parking
HOPMEADOW STREET -  CT ROUTE 10 & US ROUTE 202
OWENS BROOK BOULEVARD
N/F
The Trustees of Westminster School Inc.
Zone R-15
N/F
Mark J. Neuhauser
Zone R-15
N/F
Valley Freemasons Building Association
Zone SC
N/F
Town of Simsbury
Zone R-15
N/F
Town of Simsbury
Zone SC
172
172
173
174
175
176
176
176
175
175
174
174 175
175
174
175
174
173
172
172
173
174
173
172
171
171
173
172
171
170
170
170
171
172
173
173
172
173
172
172
171
171
173
169
169
Wetland Soils as per
Town of Simsbury GIS
100' Upland Review Area
35' SanitarySewer Easement
±36.0'
±39.7'
±35.6'
±45.7'
±78.3'
±20.4'
20' Building Setback
10' Parking Setback
Notes:
1. Parcel is located in Zone SC-1.
2. The site is served by public water and sanitary sewer services.
3. Horizontal Datum - NAD83   ~  Vertical Datum - NAVD88
Map References:
1. "Resubdivision Plan for the Relocation of Masonic Lodge,
981-987 Hopmeadow Street, A.K.A. Route's 10 & 202,
Simsbury , Conn., Zone: PO, Scale: 1"=30', July 11, 2008,
Sht. 1/2", Sanderson & Washburn
NOT VALID WITHOUT RAISED SEAL
THIS SURVEY AND MAP HAS BEEN PREPARED IN ACCORDANCE
WITH SECTIONS 20-300b-1 THRU 20 OF THE REGULATIONS OF
CONNECTICUT STATE AGENCIES - "MINIMUM STANDARDS FOR
SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS
ENDORSED BY THE CONNECTICUT ASSOCIATION OF LAND
SURVEYORS, INC.
THIS IS A PROPERTY SURVEY BASED UPON A DEPENDENT
RESURVEY.
CLASS OF ACCURACY:                 CLASS A-2 / T-2
Graphic Scale:
0' 60'40'20'10'20'
Map Showing Land of
981 Hopmeadow, LLC
981-987 Hopmeadow Street
Simsbury Connecticut
Scale: 1"=20' March 30, 2026
Prepared By
 Neriani Land Surveying, LLC
  56 Hillcrest Drive  - Barkhamsted, Connecticut 06063
 (860) 677-7732
These drawings are the property of the Surveyor and have been
prepared specifically for the Owner of the Project at this site. They
are not to be used for any other purpose, location, or person
without the written consent of the Surveyor.
No declaration is expressed or implied unless these plans bear the
live signature and embossed seal of the Surveyor whose name
appears hereon.

Page 366

Page 367

Page 368

Page 369

  

Minutes: archived copy, SHA-256 85e05e1b8497…. Agenda: archived copy, SHA-256 b66e3c5ac7ea…. Packet: kept offline, SHA-256 1ac5c360c58a….