Towns / Simsbury / Zoning Commission / Jul 20, 2026
Zoning Commission, Jul 20, 2026
Simsbury Zoning Commission Hide agendas that already have minutesDocuments
| Type | Document | Pages | Open |
|---|---|---|---|
| minutesminutes | Zoning Commission Regular Meeting Minutes | 4 | PDF download · town site |
| agenda | Zoning Commission Regular Meeting | 1 | PDF download · town site |
| packetpacket | Zoning Commission Regular Meeting (packet) Not attached: this packet is 78 MB, too large to host here. Use the town site link. |
369 | town site |
Summary
Only a meeting packet is posted. Packets (the supporting documents) are archived and searchable but not summarized; open the PDF to read it.
Full text of the documents
View the minutes PDF on this page (Zoning Commission Regular Meeting Minutes)
Text of the minutes (Zoning Commission Regular Meeting Minutes, 4 pages)
Page 1 · open in PDF
Page 1 of 4 Zoning Commission 1 Regular Meeting 2 July 20, 2026 – 7:00 P.M. 3 Simsbury Public Library – FSPL Room 4 725 Hopmeadow Street, Simsbury, CT 06070 5 6 MINUTES 7 8 I. CALL TO ORDER– Chair Braz called the meeting to order at 7:06 P.M. 9 10 Present: Chair, Tony Braz Vice Chair, Shannon Leary; Commission Members: Jackie 11 Battos, Dagny Griswold, and Tucker Salls; Alternate Commission Member s: Stacie 12 Espeso, Allen Bradford and Doug McKown; Planning Director, George McGregor; and 13 Assistant Town Planner, Brittany MacGilpin. 14 15 Absent: Commission Member, Kate Beal. 16 17 Seating of Alternates: Commissioner Espeso was appointed as a regular member for 18 tonight’s meeting. 19 20 MOTION: Commissioner Battos made a motion, seconded by Vice Chair Leary, to 21 amend the Agenda to move Application ZC 26-20 to the first item. The motion carried 22 unanimously (6-0-0). 23 24 II. APPROVAL OF MINUTES 25 26 July 6, 2026 27 28 MOTION: Commissioner Salls made a motion, seconded by Commissioner Espeso, 29 to approve the Minutes of the July 6, 2026, Regular Meeting as written. Commissioner 30 Battos abstained. The motion carried (5-0-1). 31 32 III. SITE PLAN REVIEW 33 34 ZC 26 -20, An application of Craig Foreman, Owner; Darin Senna, Agent; for the 35 installation of a 32 sq. ft. monument sign at 50 Hopmeadow Street (Assessor’s Map 36 Block Lot E18 117 001-2) Zone PAD. 37 38
Page 2 · open in PDF
Page 2 of 4 Planning Director McGregor presented the proposed monument sign. Assistant Town 39 Planner MacGilpin further discussed the recommendations from the Design Review 40 Board. 41 42 MOTION: Vice Chair Leary made a motion, seconded by Commissioner Salls, that 43 the Zoning Commission approves ZC 26-20, An application of Craig Foreman, Owner; 44 Darin Senna, Agent; for the installation of a 32 sq. ft. monument sign at 50 Hopmeadow 45 Street (Assessor’s Map Block Lot E18 117 001-2) Zone PAD. The approval is subject 46 to the following conditions: 47 48 1. The project shall be developed in substantial conformance with the plans received 49 by the Planning Department 7/13/26 prepared by Hartford Sign & Design, with the 50 conditions provided by the Design Review Board: 51 52 a. Replace the red detailing with black. 53 54 b. Use natural brownstone or an engineered stone veneer for the sign base. 55 56 c. Replace the blue stone cap on the base with brownstone. 57 58 2. Prior to building permit issuance, the applicant shall submit a landscaping plan to 59 the satisfaction of the Planning Department. 60 61 The motion carried unanimously (6-0-0). 62 63 IV. PUBLIC HEARINGS and POTENTIAL ACTION ON APPLICATIONS 64 65 ZC #26-18, An application of Dorset Crossing LLC, Owner, Dwight Merriam, Agent, 66 pursuant to Section 8 of the Zoning Regulations for a zone change and amendment to 67 the Master Development Plan to allow a car wash facility at 10 Dorset Crossing 68 (Assessor’s Map Block Lot I04 403 13C-F), Planned Area Development (PAD) Zone. 69 70 Planning Director McGregor presented the proposed zone change and amendment to 71 the Master Development Plan. The Planning Commission had a split vote on a negative 72 referral based on environmental impacts. Assistant Town Planner MacGilpin further 73 discussed the positive referral and recommendation from the Design Review Board. 74 75 Attorney Dwight Merriam, FAICP, Esq.; Civil Engineer, Brandon Handfield, PE of 76 Yantic River Consultants; Architect, Rocco Petitto, AIA, QA +M Architecture; and 93 77 Landscape Architect, Biff Schechinger, ASLA presented the proposed including the 78 changes recommended by the commission and public comment given at previous 79 meetings. The Commission asked several follow-up questions. 80 81
Page 3 · open in PDF
Page 3 of 4 Public Comments 82 83 Thomas Surman, 11 Charlotte Drive, Simsbury, spoke in opposition. 84 85 Nick Criscitelli (Planning Commissioner), 24 Centerwood Road, Simsbury, spoke in 86 opposition. 87 88 Jamie Skiba, 21 Knollwood Road, Simsbury, spoke in opposition. 89 90 Ashley Byros, 22 Gordon Street, Simsbury, spoke in opposition. 91 92 William Otis, 22 Lucy Way, Simsbury, spoke in support. 93 94 Rebecca Bellon, 55 Dorset Crossing, Simsbury, spoke in opposition. 95 96 Michelle Ciccaglione, Owner of Simsbury Therapeutic Massage and Wellness, 97 Simsbury, spoke in opposition. 98 99 John Torres, 55 Dorset Crossing, Simsbury, spoke in opposition. 100 101 Fred Medacordia, 7 Willard Street, Simsbury, spoke in opposition. 102 103 Dr. Max Grezen, 24 Cobtail Way, Simsbury, spoke in support. 104 105 Paul Chelsey, 55 Dorset Crossing, Simsbury, spoke in opposition. 106 107 Robert Demeski, 20 Butternut Lane, Simsbury, spoke in opposition. 108 109 Susan Vankleef, 6 Mallard Circle, Tariffville, spoke in opposition. 110 111 Victoria North, 88 Hedgehog Lane, Simsbury, spoke in opposition. 112 113 Lori Boyko, 15 Oakhurst Road, Simsbury, spoke in opposition. 114 115 Richard Bidwell, 6 Knollwood Circle, Simsbury, spoke in opposition. 116 117 Julian Weaver, 13 Willard Street, Simsbury, spoke in opposition. 118 119 Sharon Byron, 17 Crestview Road, Tariffville, spoke in opposition. 120 121 MOTION: Commissioner Salls made a motion, seconded by Commissioner Battos, to 122 close the public hearing for ZC #26-18. The motion carried unanimously (6-0-0). 123 124
Page 4 · open in PDF
Page 4 of 4 Chair Braz recommended referring this application to the Conservation Commission. 125 126 MOTION: Commissioner Salls made a motion, seconded by Commissioner Espeso, 127 to refer ZC #26-18, An application of Dorset Crossing LLC, Owner, Dwight Merriam, 128 Agent, pursuant to Section 8 of the Zoning Regulations for a zone change and 129 amendment to the Master Development Plan to allow a car wash facility at 10 Dorset 130 Crossing (Assessor’s Map Block Lot I04 403 13C -F), Planned Area Development 131 (PAD) Zone, to the Conservation Commission. The motion carried unanimously. (6-0-132 0) 133 134 MOTION: Commissioner Battos made a motion, seconded by Vice Chair Leary , to 135 forward Application ZC # 26-18 and Application ZC # 26-9 to the September 9, 2026 136 meeting. The motion carried unanimously (6-0-0). 137 138 V. OTHER BUSINESS 139 140 Preliminary, informal presentation for the potential redevelopment of a portion 141 of 981-987 Hopmeadow St., Zone SC; Phil Doyle, LADA, P.C., representing the 142 owner. 143 144 Mr. Doyle presented the proposed redevelopment project for this site. 145 146 VI. ADJOURNMENT 147 148 MOTION: Vice Char Leary made a motion, seconded by Commissioner B attos, for 149 the meeting to be adjourned. The motion carried unanimously (6-0-0). 150 151 Chair Braz adjourned the meeting at 9:36 P.M. 152 153 Respectfully submitted, 154 155 Amanda Blaze 156 Commission Clerk 157
View the agenda PDF on this page (Zoning Commission Regular Meeting)
Text of the agenda (Zoning Commission Regular Meeting, 1 page)
Page 1 · open in PDF
Zoning Commission Regular Meeting Agenda ZC AGENDA 7-20-26.PDF ZC 26-18 Dorset Crossing Zone Change And Master Plan Amendment ZC 26-19 DORSET CROSSING CAR WASH MASTER PLAN CHANGE AND SITE PLAN STAFF MEMO W ATTACH.PDF ZC 26-18 10 DORSET CROSSING APPLICATION AND PROJECT NARRATIVES.PDF ZC 26-18 10 DORSET CROSSING ARCHITECTURAL PLANS.PDF ZC 26-18 10 DORSET CROSSING MASTER DEVELOPMENT PLAN.PDF ZC 26-18 10 DORSET CROSSING REVISED LANDSCAPE PLAN AND PLANT DETAILS.PDF ZC 26-19 10 Dorset Crossing Car Wash Site Plan ZC 26-19 DORSET CROSSING CAR WASH MASTER PLAN CHANGE AND SITE PLAN STAFF MEMO W ATTACH.PDF ZC 26-18 10 DORSET CROSSING REVISED LANDSCAPE PLAN AND PLANT DETAILS.PDF ZC 26-19 10 DORSET CROSSING ARCHITECTURAL PLANS.PDF ZC 26-19 10 DORSET CROSSING STORMWATER MANAGEMENT REPORT.PDF ZC 26-19 10 DORSET CROSSING TRAFFIC STUDY.PDF ZC 26-19 10 DORSET CROSSING APPLICATION - REDACTED.PDF ZC 26-18 10 DORSET CROSSING MASTER DEVELOPMENT PLAN.PDF ZC 26-18 10 DORSET CROSSING APPLICATION AND PROJECT NARRATIVES.PDF ZC 26-20 70 Hopmeadow St. Sign ZCR 70 HOPMEADOW STREET APPLICATION.PDF ZCR 70 HOPMEADOW STREET STAFF REPORT.PDF 981-987 Hopmeadow Street Preliminary Review 981-987 HOPMEADOW ST COMBINED PRELIMINARY PLAN SET.PDF 1. Documents: 2. Documents: 3. Documents: 4. Documents: 5. Documents:
Text of the packet (Zoning Commission Regular Meeting (packet), 369 pages)
Page 1
Zoning Commission Regular Meeting Agenda ZC AGENDA 7-20-26.PDF ZC 26-18 Dorset Crossing Zone Change And Master Plan Amendment ZC 26-19 DORSET CROSSING CAR WASH MASTER PLAN CHANGE AND SITE PLAN STAFF MEMO W ATTACH.PDF ZC 26-18 10 DORSET CROSSING APPLICATION AND PROJECT NARRATIVES.PDF ZC 26-18 10 DORSET CROSSING ARCHITECTURAL PLANS.PDF ZC 26-18 10 DORSET CROSSING MASTER DEVELOPMENT PLAN.PDF ZC 26-18 10 DORSET CROSSING REVISED LANDSCAPE PLAN AND PLANT DETAILS.PDF ZC 26-19 10 Dorset Crossing Car Wash Site Plan ZC 26-19 DORSET CROSSING CAR WASH MASTER PLAN CHANGE AND SITE PLAN STAFF MEMO W ATTACH.PDF ZC 26-18 10 DORSET CROSSING REVISED LANDSCAPE PLAN AND PLANT DETAILS.PDF ZC 26-19 10 DORSET CROSSING ARCHITECTURAL PLANS.PDF ZC 26-19 10 DORSET CROSSING STORMWATER MANAGEMENT REPORT.PDF ZC 26-19 10 DORSET CROSSING TRAFFIC STUDY.PDF ZC 26-19 10 DORSET CROSSING APPLICATION - REDACTED.PDF ZC 26-18 10 DORSET CROSSING MASTER DEVELOPMENT PLAN.PDF ZC 26-18 10 DORSET CROSSING APPLICATION AND PROJECT NARRATIVES.PDF ZC 26-20 70 Hopmeadow St. Sign ZCR 70 HOPMEADOW STREET APPLICATION.PDF ZCR 70 HOPMEADOW STREET STAFF REPORT.PDF 981-987 Hopmeadow Street Preliminary Review 981-987 HOPMEADOW ST COMBINED PRELIMINARY PLAN SET.PDF 1. Documents: 2. Documents: 3. Documents: 4. Documents: 5. Documents:
Page 2
Page 1 of 2 Zoning Commission Regular Meeting July 20, 2026, at 7:00 PM Simsbury Public Library – FSPL Program Room 725 Hopmeadow St., Simsbury CT, 06070 AGENDA I. CALL TO ORDER Seating of Alternates II. APPROVAL OF MINUTES July 6, 2026 Regular Meeting III. PUBLIC HEARINGS and ACTION ON APPLICATIONS ZC #26-18, An application of Dorset Crossing LLC, Owner, Dwight Merriam, Agent, pursuant to Section 8 of the Zoning Regulations for a zone change and amendment to the Master Development Plan to allow a car wash facility at 10 Dorset Crossing (Assessor’s Map Block Lot I04 403 13C-F), Planned Area Development (PAD) Zone. IV. SITE PLAN REVIEW ZC 26-19, An application of Dorset Crossing LLC, Owner, Dwight Merriam, Agent, for a site plan approval to develop a 7,275 sq. ft. car wash facility at 10 Dorset Crossing (Assessor’s Map Block Lot I04 403 13C-F), Planned Area Development (PAD) Zone. ZC 26-20, An application of Craig Foreman, Owner; Darin Senna, Agent; for the installation of a 32 sq. ft. monument sign at 50 Hopmeadow Street (Assessor’s Map Block Lot E18 117 001-2) Zone PAD.
Page 3
Page 2 of 2 V. OTHER BUSINESS Preliminary, informal presentation for the potential redevelopment of a portion of 981-987 Hopmeadow St., Zone SC; Phil Doyle, LADA, P.C., representing the owner. Planning Director Report VI. EXECUTIVE SESSION The Commission may enter into Executive Session, Pursuant to General Statutes Section 1-200(6)(B): Discussion of Pending Litigation and/or Claim. VII. ADJOURNMENT
Page 4
Marc S. Nelson, MPA George K. McGregor, AICP Town Manager Director PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT 933 Hopmeadow St. Tel. (860) 658-3245 Simsbury, CT 06070 gmcgregor@simsbury-ct.gov STAFF REPORT MEMORANDUM To: Simsbury Zoning Commission From: George K. McGregor, AICP Date: July 20, 2026 Subject: ZC 26-18, Dorset Crossing Zone Change/Master Plan ZC 26-19, 10 Dorset Crossing Site Car Wash Site Plan ZC #26-18, An application of Dorset Crossing LLC, Owner, Dwight Merriam, Agent, pursuant to Section 8 of the Zoning Regulations for a zone change and amendment to the Master Development Plan to allow a car wash facility at 10 Dorset Crossing (Assessor’s Map Block Lot I04 403 13C-F), Planned Area Development (PAD) Zone. ZC 26-19, An application of Dorset Crossing LLC, Owner, Dwight Merriam, Esq. Applicant, for a site plan approval to develop a 7,275 sq. ft. car wash facility at 10 Dorset Crossing (Assessor’s Map Block Lot I04 403 13C-F), Planned Area Development (PAD) Zone.
Page 5
2 This staff report is a joint staff report for the zone change/master plan amendment and site plan. Master Plan Amendment/Zone Change Dorset Crossing is a Planned Area Development (PAD), established in 2013 with a mix of commercial and residential uses. The project was amended in 2022 and 2023 and currently allows 27,000 sq.ft. of commercial and 360 multi-family residential homes. The development is partially constructed: Use Type LOT Density Constructed Mixed Use Retail/Medical Office A 15,000 sf Yes Residential Multi-Family B 168 units Yes Special Needs Multi-Family C 48 units Yes Residential Multi-Family D 30 units NO Mixed Use/Retail F 12,000 sf NO Residential Multi-Family G 42 units NO Residential Multi-Family H 72 units NO The Applicant proposes to amend the area described as “Lot F” by replacing two proposed buildings (12,000 sq.ft. of “retail/office”) with a 7,275 sq.ft. car wash facility. A “car wash” is defined separately in the zoning regulations and is not generally included along with other retail uses. Thus, the amendment to add the use constitutes a Master Development Plan change. Current conceptual plan alongside proposed: Having completed the first stage, a preliminary, non-binding review, the application is now a Master Plan/Zone Change application with a corresponding Site Plan. With
Page 6
3 this submission the Applicant requests formal review and action. The Application was accepted on July 6, 2026, and will be forwarded for referral to the Planning Commission (July 14, 2026) and the Design Review Board (July 20, 2026). The application is scheduled for a public hearing at the Zoning Commission on July 20, 2026. The master plan submission includes a site plan, traffic study, architectural elevations and other relevant materials. The property is zoned PAD and is in an Aquifer Protection District. A car wash is a permitted, unregulated activity in the aquifer district so long as “all waste waters from such activity are lawfully disposed of through a connection to a publicly owned treatment works.”1 Staff Review and Analysis-Master Plan Amendment Dorset Crossing is designated by the Plan of Conservation and Development (POCD) as a “Special Zone,” based on its mixed-use, Planned Area Development 1 Aquifer Protection Area Regulation p.6
Page 7
4 Zoning. PADs are mixed use developments holding both residential and nonresidential components. The master plan for the Dorset Crossing development identifies this subject parcel for “retail/office” uses. An amendment allowing a car wash facility to be developed in lieu of retail or office is generally consistent and appropriate for the development. The car wash use is also consistent with the POCD which supports mixed-use development in this location. Site Plan Review The Applicant proposes to develop a 7,275 sq.ft. car wash facility at 10 Dorset Crossing. The project is subject to Section 8.1 (PAD regulations) and Section12 (Site Plan Regulations) of the Zoning Regulations. Accompanying and in support of the application the Applicant has submitted: Site Plan (w/ drainage, stormwater, utilities, lighting, etc....) Architectural Elevations Traffic Study Landscaping Plan Narrative and ongoing responses to identified issues.
Page 8
5 The car wash proposed is a multi-faceted facility. Elements on site include an automated drive through car wash, separate self-service car wash bays, detailing options, and vacuum stations. Access to the site will be via an internal unnamed Dorset Crossing street; no direct access is planned to Dorset Crossing Drive or Hopmeadow St. The facility plans 24-hour operations, with the self-service bays open after the attended car wash tunnel closes. The Planning Commission questioned the necessity of being open 24 hours and the lighting impacts of such hours. The Applicant proposes to review these impacts after one year in operation2. The Applicant has submitted a traffic study detailing the impacts of the amendment and site plan on traffic generation and turning movements. The proposed scenario represents an overall reduction in trip generation from both the original approval and recent revisions due to the reduction in commercial and increase in residential units. Nonetheless, a car wash does present some challenges as the peaks traffic activity can vary from other commercial uses and on-site queuing must be considered (the queue as shown is +-18 cars). We note the Level of Service (LOS) C under certain turning movements. Staff asks the applicant to confirm whether the Level of Service C exists today or is decreased from B due to this application. The Application contains a comprehensive landscaping plan with the focus on supplementing screening along Hopmeadow St. Additionally, street trees and on- site foundation plantings are offered. Native species are intended at 100%. Referral, Staff Review, and Analysis Specific review comments from individual referral agencies are attached to this report: Planning Commission-The Planning Commission will review the Application on July 14, 2026. During previous informal sessions the Commission requested information related to traffic impacts, hours of operation, water service availability, and drought implications over water usage Design Review Board-The DRB will review this application for a formal recommendation on July 20, 2026. During previous informal sessions, the DRB was broadly supportive of the architectural design and site plan. 2 See Applicant “Car Wash Action List” #4, attached to Staff Memorandum
Page 9
6 Fire Marshal-The Fire Marshal has requested a widening of internal drive aisles, along with other options, for fire safety and access reasons. The Applicant is considering site revisions to meet this requested standard. Planning Staff-Planning Staff has requested additional information related to waster service capacity from Aquarion; engineering wastewater reporting; industry- related standards for water recycling; lighting standards; wall sign information; hours of operation; and standard sheet information for site plan applications. Staff and the Applicant are working to address these issues. Town Engineer-The Town Engineer concurs with Planning that a wastewater engineering report, as required by the zoning regulations, be submitted. The Town Engineer, in a memo dated July 14, 2026, requested minor clarifications. No additional outstanding issues have been identified. Town Police Department-No outstanding issues identified. Staff and the Applicant are working to gather additional information requested and resolve outstanding issues. Staff and the Applicant agree on a recommendation to continue site plan review at the commission’s September 9, 2026, regular meeting.
Page 10
7 Draft Motions Zone Change/Master Plan Amendment MOVED, The Zoning Commission APPROVES Application ZC 26-18 of Dorset Crossing LLC, owner, Dwight Merriam Esq., applicant, for formal Application Review to amend the Master Development Plan at Dorset Crossing to include a Car Wash Facility at 10 Dorset Crossing, based on a finding that: The master plan for the Dorset Crossing development identifies this subject parcel for “retail/office” uses. An amendment allowing a car wash facility to be developed in lieu of retail or office is generally consistent and appropriate for the development. The car wash use is also consistent with the POCD which supports mixed-use development in this location. The Approval is subject to the following conditions: 1. Zone Change/Master Plan Amendment shall be developed in substantial conformance to the Dorset Crossing PAD Master Development Plan dated April 30, 2026, REVISED June 26, 2026 The Zone Change/Master Plan is effectively immediately, subject to the standard appeal period. OR Alternate Motion Site Plan MOVED, the Zoning Commission FORWARDS ZC 26-19, An application of Dorset Crossing LLC, Owner, Dwight Merriam, Agent, for a site plan approval to develop a 7,275 sq. ft. car wash facility at 10 Dorset Crossing to the regular meeting on September 9, 2026. OR Alternate Motion
Page 11
Marc S. Nelson, MPA Thomas J. Roy, P.E. Town Manager Director of Public Works Town Engineer DEPARTMENT OF PUBLIC WORKS – ENGINEERING DIVISION https://ct-simsbury.civicplus.com Mon. (8:30am-7:00pm) Tel. (860) 658-3260 933 Hopmeadow Street Tue. Wed. Thu. (8:30am-4:30pm) Fax. (860) 658-3205 Simsbury, CT 06070 Fri. (8:30am-1:00pm) akessler@simsbury-ct.gov MEMORANDUM To: George K. McGregor, AICP, Dir. of Community Planning and Development From: Adam D. Kessler, P.E., Deputy Town Engineer cc: Date: July 14, 2026 Subject: Engineering Comments - #10 Dorset Crossing Proposed Diamond Sparkle Car Wash, LLC ZC 26-18 & ZC 26-19 The Engineering Department has reviewed the documents submitted as part of the Site Modification Application for the development of #10 Dorset Crossing as a Diamond Sparkle Car Wash. Documents were received by this department on June 30, 2026: 1. Site plan set entitled “Dorset Crossing Pad Master Development Plan, Site Modification – Lot F”, prepared for Dorset Crossing LLC, prepared by YRC, dated March 20, 2025, revised through June 26, 2026. 2. Stormwater report entitled “Master Plan Development, Stormwater Management Report, Site Modification – Lot F, Proposed Diamond Sparkle Car Wash”, prepared for Diamond Sparkle Car Wash, LLC prepared by YRC, dated June 29, 2026. Applicant shall respond to all comments in writing and note any and all revisions made to the design plans and supporting reports. In consideration of the documents submitted as of the date of this review memorandum, we offer the following: 1. Please copy this office with all permit applications submitted to state agencies related to this project. 2. Please provide final construction plans for the record and reference during construction. 3. Provide a turning movement study to demonstrate acceptable site access for fire apparatus. 4. Provide details related to the proposed improvement including but not limited to pavement sections, drainage and utilities. 5. Provide an inspection report of the existing drainage infrastructure that will receive runoff from this development. Pre‐construction inspection will provide a baseline condition of the existing
Page 12
Engineering Comments May 5, 2026 Page 2 of 2 system to ensure all parties, including the Town, are aware of the condition. It is recommended to remove any accumulated sediment or debris from existing structures downstream of the improvements before construction and following construction. 6. Please review Table 3 of the Traffic Impact Statement for accuracy. The SB Thru Queue during the Saturday Peak Hour is “#572”. Is this an error? Or does the “#” symbol refer to a note elsewhere in the report? 7. While the level of service at the Dorsett Crossing intersection with Hopmeadow Street remains acceptable, the level of service degrades with each new development. Please note that additional development in the future may require further study of traffic impacts and mitigations to maintain LOS C or better. 8. Facility connection charge and permit from the Simsbury WPCA are required to connect to the existing sanitary sewer lateral.
Page 13
Archived: Tuesday, July 14, 2026 8:04:36 AM From: Patrick T. Tourville, CFI I Sent: Thu, 2 Jul 2026 11:20:12 To: McGregor George Subject: Re: ZC 26-18 10 Dorset Crossing Master development plan Importance: Normal Sensitivity: None External sender <ptourville@simsburyfd.org> Make sure you trust this sender before taking any actions. Fire Department access roads need to be 20 feet wide. The roads around perimeter are only 13 feet, and the entry shows 18 feet per lane. If the main entry exit is not blocked with any islands or barriers this would be ok. Patrick Tourville CFI-I Fire Marshal Chief of Fire Prevention Simsbury Fire District 871 Hopmeadow Street Simsbury, CT 06070 Office 860.658.1973 Cell 860.818.0479 From: McGregor George <gmcgregor@simsbury-ct.gov> Sent: Wednesday, July 1, 2026 10:21 AM To: Patrick T. Tourville, CFI I <PTourville@simsburyfd.org>; nboulter <nboulter@pd.simsbury-ct.gov>; Davis Chris <cdavis@pd.simsbury-ct.gov> Subject: ZC 26-18 10 Dorset Crossing Master development plan Attached are relevant info for the FINAL Master Plan Site Plan for the Car Wash. If you have comments please provide by Friday July 10. I am waiting on a electronic traffic study and will forward when I get. George George K. McGregor, AICP Planning & Community Development Director Town of Simsbury 933 Hopmeadow Street Simsbury, CT 06070 P(860) 658 3252 gmcgregor@simsbury-ct.gov
Page 14
The Planning and Community Development Department has been made aware of fraudulent emails containing false invoices for land use applications. If you receive a suspicious email, we urge you to contact us at 860-658-3252.
Page 15
Archived: Tuesday, July 14, 2026 8:04:47 AM
From: Davis Chris
Sent: Mon, 13 Jul 2026 15:57:11
To: McGregor George Boulter Nicholas (SPD)
Subject: RE: car was site plan and traffic study
Importance: Normal
Sensitivity: None
Warning: Unusual sender <cdavis@pd.simsbury-ct.gov>
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.
I don’t have any concerns with it.
Thank you!
____________________
Christopher A. Davis
Deputy Chief of Police
Simsbury Police Department
(860) 658-3104
From: McGregor George <gmcgregor@simsbury-ct.gov>
Sent: Monday, July 13, 2026 11:17 AM
To: Boulter, Nicholas <NBoulter@pd.simsbury-ct.gov>; Davis Chris <CDavis@pd.simsbury-ct.gov>
Subject: car was site plan and traffic study
Y o u g u y s h a v e a n y c o m m e n t s o n t h is a p p lic a t io n ? I s e n t in f o t w o w e e k s b a c k o r s o G e o r g e K . M c G r e g o r , A I C P P la n n in g & C o m m u n it y D e v e lo p m e n t D ir e c t o r T o w n o f S im s b u r y 9 3 3 H o p m e a d o w S t r e e t S im s b u r y , C T 0 6 0 7 0 P ( 8 6 0 ) 6 5 8 3 2 5 2 g m c g r e g o r @ s im s b u r y - c t . g o v
External sender <gmcgregor@simsbury-ct.gov>
Make sure you trust this sender before taking any actions.
You guys have any comments on this application? I sent info two weeks back or so
George K. McGregor, AICP
Planning & Community Development Director
Town of Simsbury
933 Hopmeadow Street
Simsbury, CT 06070
P(860) 658 3252
gmcgregor@simsbury-ct.gov
Page 16
The Planning and Community Development Department has been made aware of fraudulent emails containing false invoices for land use applications. If you receive a suspicious email, we urge you to contact us at 860-658-3252.
Page 17
Car Wash Action List 2026-07-09 1. The zoning use list definition asks for a “report from a professional engineer on the disposal and impact of wastewater and cleaning products…” I find no such report in the submission. Client has engaged an expert consultant. 2. The plan set labeled “PAD” Submission contains sheets generally used for a site plan submission. Is the plan to use this PAD submission for the site plan as well? I have asked Town Engineering for their input on this. It shall meet Section 11. Yes, we have assumed that the master plan amendment typically includes the site plan, but it may be better for the town and the applicant if there is a separate site plan application later after receipt of additional information requested from others.. Addressing Section 11 requirements may have to come later. 3. There is a document labeled “PAD Master Plan Submission; Development Narrative” which starts with a “9. “ Entry related to landscaping. This item appears isolated and is perhaps part of a larger document? It is unclear. Resolved. 4. Hours of operation. As discussed during preliminary review and raised by the Planning Commission, please confirm intended hours of operation for all services on site. Also, please address site lighting impacts as it relates to hours of operation. If the self-service car wash operation is to be open after the attended car wash tunnel is closed, some lighting will remain on. The reduction in lighting is indicated on the site plans.
Page 18
As to hours of operation, many people are on shift work, particularly in health services where they are 24/7 and employees go in and out day and night. The experience in Colchester is that 15% of customers use the facility between 11 PM and 5 AM. The proposal is to be open 24/7 with a condition requiring the developer to return one year after commencing operations for a review of the lighting and the operation. The developer will pay the cost of an independent lighting consultant and planner or traffic engineer to review the lighting and the impact of the operation. If 24/7 operations are unsatisfactory to the Zoning Commission in its sole discretion, the approval would be amended to limit the hours of operation to 5 AM to 11 PM with the site fully shut down from 11:00 PM to 5:00 AM. With that year of experience, the developer can adjust the lighting to provide safe access while minimizing the light and have the operating experience to assess the extent to which the public need is being met with no adverse impacts. 5. As raised during the PC review, please address water usage and service availability from Aquarion High usage is a concern of commissioners. A request was made to Aquarion to confirm the availability to service the proposed use. They have not responded. They have said they will be providing a 1.5-inch service from the 4-inch line.
Page 19
6. Please provide a broader description and narrative related to proposed water recycling efforts as they relate to industry standards and best practices. The stated commitment to 30-40 percent seems low. An expert consultant has been engaged to provide the requested information. The developer is awaiting information from the equipment provider. 7. Traffic Study includes the Hotel. It is not part of the Dorset Crossing PAD, but I guess can be helpful vis a vis comparison for trip generation under different scenarios. The traffic engineer agrees it is useful information. 8. Please specify the color temperature of the pole lights proposed and adjust the shielding of the fixtures at the northern property line. They are limited to 3,000 Kelvin and cannot measure more than 0.5 FC at the property line under the outdoor lighting regulations. See Lighting Statement 2 and Note 1. The specified lights are 3000K. As for the 0.5 fc at the property line, a question is raised as to its applicability in a PAD with common lot lines where the abutter and driveway lights are physically on our property and illuminating other properties. 9. Please confirm no signs are proposed currently. If wall signs or freestanding signs are intended, please provide appropriate plans and specifications. Wall signs are as shown on the site plan and architectural renderings. Details on materials and lighting are forthcoming. There is a freestanding sign facing Dorset Crossing Drive; details forthcoming. Added items: 1. Fire marshal’s drive lane widths. Redesign in process.
Page 20
Page 21
1 Diamond Sparkle Car Wash at Dorset Crossing Master Plan Change, Text Amendment, and Site Plan This is the final step of the three-part process for approving a new use in the Dorset Crossing Planned Area Development (PAD) zone. The proposal is to amend the Master Development Plan at Dorset Crossing and approve a site plan to enable development of a car wash at 10 Dorset Crossing, (Assessor’s Map Block Lot I04 403 13C-F), Planned Area Development (PAD) zone. The parcel is known as Lot F. In 2013, Dorset Crossing was approved as a Planned Area Development (PAD) with a mix of commercial and residential uses. The project mix was amended in 2022 and 2023 and currently allows 27,000 sq. ft. of commercial and 360 multi-family residential homes. The application proposes to amend the PAD zoning for “Lot F” to replace the current two- building, 12,000 sq. ft. of “retail/office” concept (approved but never developed) with a substantially smaller 7,275 sq. ft. car wash facility. A car wash is a permitted use as required by Section 8.1C of the PAD regulations: A. Permitted Uses Any use(s) permitted as of right or by Special Permit or Special Exception in the Simsbury Zoning Regulations are eligible for inclusion in a PAD and may be permitted in a Planned Area Development Zone. Such uses may be combined in a Mixed Use Development in accordance with the Development Plan Standards set forth in this Section.
Page 22
2 The car wash use is a marked improvement over the current approved use in nearly every respect: 1. The access plan will eliminate the curb cut on Dorset Crossing Drive, eliminating the conflict in turning movements with the existing driveway. 2. The impervious surface is reduced by nearly 12%. 3. The number of parking spaces required is greatly reduced. 4. The landscaping will have 100% native vegetation. 5. The side yard in the current use is 9 feet; the proposed use has over 50 feet. 6. The front yard for the building in the current approved use is a scant 9 feet; the car wash is 60 feet, nearly 7 times greater. 7. The building area is reduced by over 40%. 8. Even with the proposed hotel, on the adjacent parcel, the combined development traffic is still below the original approved peak hour volumes of the originally approved development The proposed car wash is consistent with the Plan of Conservation and Development and meets the demand in market area of a car wash utilizing the latest technology and providing unequaled customer service. It is an important and needed use for the many, and an increasing number of, residents in Simsbury living in multifamily developments. And, finally, and perhaps of overarching merit for this proposal, is the design, not only in the site engineering aspects noted above in terms of reducing the impact over the existing, approved use of Lot F, but the exceptionally attractive architectural design by a preeminent area firm, decidedly not the typical “out-of-the-box” design that comes with the car wash franchise operations with hundreds of the same car washes, all the same. This unique, site-specific, sensitive to its neighbors, and technology supporting design is nonpareil. June 30, 2026
Page 23
Page 24
A3.01 A3.1 2 A3.0 2 A3.1 1 30' - 0"15' - 0"22' - 0"14' - 8"11' - 4" 6' - 0" 4' - 0" 45' - 0" 38' - 0" 24' - 0" 2' - 0" 6' - 0" 10' - 0" 26' - 0" 19' - 0" 70' - 0" 30' - 0"15' - 0"EQEQ14' - 8 1/2"25' - 4" 125' - 0" 107' - 0" 4' - 8" AUTOMATIC SOFT TOUCH AUTOMATIC TOUCHLESS OVERSIZE SELF- SERVICE SELF-SERVICE DETAILING BAYS EQUIPMENT ROOM OFFICE 22' - 2" 29' - 2" N 195 Scott Swamp Road Farmington, CT 06032 qamarch.com Issue Dates: Project #: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY E:\REVIT LOCAL\DSCW Mdl2_rpetitto.rvt6/29/2026 4:32:20 PM A1.1 FIRST FLOOR PLAN MUNICIPAL REVIEW 05.04.2026 QAM25090 DIAMOND SPARKLE CAR WASH PROJECT DESCRIPTION: SIMSBURY, CT Revisions
Page 25
8 1/2" / 1'-0" 8 1/2" / 1'-0" 1'-1" / 1'-0" 1'-1" / 1'-0" 8 1/2" / 1'-0"8 1/2" / 1'-0" 8 1/2" / 1'-0" 8 1/2" / 1'-0"8 1/2" / 1'-0" 8 1/2" / 1'-0" 8 1/2" / 1'-0" 1'-1" / 1'-0" 1'-1" / 1'-0" 1'-1" / 1'-0" 1'-0" / 1'-0"1'-0" / 1'-0" 1'-1" / 1'-0" 9" / 1'-0" 9" / 1'-0" ARCHITECTURAL ASPHALT SHINGLES ALUMINUM GUTTER TYP ALUMINUM GUTTER TYP ALUMINUM GUTTER TYPALUMINUM GUTTER TYP ALUMINUM GUTTER TYP ARCHITECTURAL ASPHALT SHINGLES ARCHITECTURAL ASPHALT SHINGLES STANDING SEAM METAL ROOFING N 195 Scott Swamp Road Farmington, CT 06032 qamarch.com Issue Dates: Project #: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY E:\REVIT LOCAL\DSCW Mdl2_rpetitto.rvt6/29/2026 4:32:23 PM A1.4 ROOF PLAN MUNICIPAL REVIEW 05.04.2026 QAM25090 DIAMOND SPARKLE CAR WASH PROJECT DESCRIPTION: SIMSBURY, CT Revisions 1/8" = 1'-0"A1.4 1 ROOF PLAN
Page 26
ARCHITECTURAL ASPHALT SHINGLES ALUMINUM GUTTER TYP STANDING SEAM METAL ROOFING WHITE PVC TRIM TYP WHITE PVC TRIM TYP SPLIT FACED CMU TYP BOARD AND BATTEN VINYL SIDING AT GABLE INSETS TYP HARDIE CLAPBOARD SIDING BOARD AND BATTEN VINYL SIDING AT GABLE INSETS TYP ALL SIGNAGE SHOWN AT 1'6" HIGH TO MIDPOINT 26' - 7" FROM GRADE ARCHITECTURAL ASPHALT SHINGLES ALUMINUM GUTTER TYP STANDING SEAM METAL ROOFING WHITE PVC TRIM TYP WHITE PVC TRIM TYPSPLIT FACED CMU TYP BOARD AND BATTEN VINYL SIDING AT GABLE INSETS TYP HARDIE CLAPBOARD SIDING BOARD AND BATTEN VINYL SIDING AT GABLE INSETS TYP ALL SIGNAGE SHOWN AT 1'6" HIGH 14' - 0" TYP N 195 Scott Swamp Road Farmington, CT 06032 qamarch.com Issue Dates: Project #: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY E:\REVIT LOCAL\DSCW Mdl2_rpetitto.rvt6/29/2026 4:32:25 PM A3.0 ELEVATIONS MUNICIPAL REVIEW 05.04.2026 QAM25090 DIAMOND SPARKLE CAR WASH PROJECT DESCRIPTION: SIMSBURY, CT Revisions 1/8" = 1'-0"A3.0 1 ENTRY (EAST) 1/8" = 1'-0"A3.0 2 EXIT/DETAIL BAY (WEST)
Page 27
ENTER ENTER ENTER EXIT ARCHITECTURAL ASPHALT SHINGLES ALUMINUM GUTTER TYP STANDING SEAM METAL ROOFING WHITE PVC TRIM TYP WHITE PVC TRIM TYPSPLIT FACED CMU TYP BOARD AND BATTEN VINYL SIDING AT GABLE INSETS TYP HARDIE CLAPBOARD SIDING BOARD AND BATTEN VINYL SIDING AT GABLE INSETS TYP ALUMINUM STOREFRONT TYP ENTEREXIT ARCHITECTURAL ASPHALT SHINGLES ALUMINUM GUTTER TYP STANDING SEAM METAL ROOFING WHITE PVC TRIM TYP WHITE PVC TRIM TYPSPLIT FACED CMU TYP HARDIE CLAPBOARD SIDING BOARD AND BATTEN VINYL SIDING AT GABLE INSETS TYP ALUMINUM STOREFRONT TYP WHITE PVC TRIM TYP N 195 Scott Swamp Road Farmington, CT 06032 qamarch.com Issue Dates: Project #: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY E:\REVIT LOCAL\DSCW Mdl2_rpetitto.rvt6/29/2026 4:32:27 PM A3.1 ELEVATIONS MUNICIPAL REVIEW 05.04.2026 QAM25090 DIAMOND SPARKLE CAR WASH PROJECT DESCRIPTION: SIMSBURY, CT 1/8" = 1'-0"A3.1 2 TOUCHLESS/SELF SERVICE BAY (NORTH) 1/8" = 1'-0"A3.1 1 OFFICE/MECH ROOM (SOUTH) Revisions
Page 28
S
S
S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
WG
WG
WG
WG
WG
S
WG
GG
WG
S
W
S
WG
S
S
GG
S
?
EE
WG
SEE NOTE #3
LINE
PROPERTY
FORMER
2622
CL&P
2623
CL&P
234
CL&P
3572
CL&P
4362
SNET
235
CL&P
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
C
C
C
FLAG POLE
D
G
A
TE
GRAVEL DRIVE
CONC. WALK
CONC. WALK
connection (typ.)
access/roadway
Possible future
connection (typ.)
access/roadway
Possible future
Total 24 Apartments 3 Story
BUILDING #4
Mixed Use Retail/Medical Office
Total 15,000 Square Feet 1 Story
BUILDING #2 30
40
13A
Total 24 Apartments
3 Story
BUILDING #5
50
Total 24 Apartments 3 StoryBUILDING #6
70
Signal
Traffic
VE
DR
IVE
W
A
Y
DRIVE
SAX
TO
N
B
R
OOK
DR.
ROAD
C
IRCLE
K
N
O
L
LW
O
O
D
C
E
N
T
E
R
-
W
O
O
D
R
D
.
WILLARD
GORDON
ST.
ST.
ELY
LANE
Saxton
Hoskins
ROAD
WESCOTT
ROAD
Brook
R
IVE
R
S
T
A
T
E
O
F
C
O
N
N
E
C
T
IC
U
T
315
W
E
S
T
WE
K
IL
BO
U
R
N
HO
W
A
R
D
S
T
.
R
D
.
(I
NA
C
T
IV
E
)
HOSKINS
SIMSBURY
AIRPORT
TULLER
DR.
WOLC
O
TT
SIMSBURY PINES
L
AU
R
IE
-
J
O
E
W
AY
47.02
47.45
47.54
47.93
48.04
48.21
0.85
0.92
1.04
1.3
EGDIRBRETSAC GNISSORC
TESROD CROSSING
S
T
R
E
E
T
47.61
47.71
DATE DESCRIPTION
PROFESSIONAL SEAL
SHEET
DATE
REVISED
4/30/26
6/26/26
OFCONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
1 6
REVISION SUMMARY
PREPARED FOR
SCALE: 1" = 40'
PROJECT NUMBER:
00222 - 001
40 0 40 80 120
DIAMOND SPARKLE CAR WASH LLC
359 LEBANON AVENUE
COLCHESTER, CT 06415
DORSET CROSSING LLC
30 DORSET CROSSING
SIMSBURY, CT 06070
SIMSBURY, CT
DORSET CROSSING PAD
MASTER DEVELOPMENT PLAN
PREPARED FOR
DIAMOND SPARKLE CAR WASH LLC, APPLICANT
TITLE SHEET
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)
DORSET CROSSING DRIVEMAP REFERENCES:
HO
P
M
E
ADO
W
S
T
R
EET
(C
T
R
OU
TE
10
&
202
)
BUILDING #1
CAR WASH
TOTAL 7,275 SF±
1 STORY
LOT A
67 SPACES
LOT F
LOT H
148 SPACES
INDEX OF SHEETS
TITLE SHEET 01
MASTER DEVELOPMENT PLAN
SCALE: 1" = 1000'
APPLICANT OWNER
SCALE: 1" = 1000'
ZONING LOCATION MAP
SITE LOCATION MAP
DESCRIPTION SHEET NUMBER
DEVELOPMENT LAYOUT PLAN - LOT F 02
GRADING & DRAINAGE PLAN 03
UTILITY PLAN 04
LIGHTING PLAN 05
EROSION & SEDIMENTATION CONTROL PLAN 06
DORSET CROSSING PAD
SITE MODIFICATION - LOT F
10 DORSET CROSSING (M/B/L I04/403/13C-F)
SIMSBURY, CONNECTICUT
LOT F
SITE
(HATCHED)
NDDB AREA
APA LIMIT
PAD
SITE
10
TOWN ROAD MAP OBTAINED FROM THE CONNECTICUT DEPARTMENT OF TRANSPORTATION DATABASE.4.
ADMINISTRATION (NOAA) OF THE US DEPARTMENT OF COMMERCE DATABASE.
ELEVATION DATA OBTAINED FROM MAP REFERENCE 1 AND NATIONAL OCEANIC AND ATMOSPHERIC3.
ORTHOIMAGERY SPRING 2025 FROM NEARMAP.2.
HESKETH & ASSOCIATES, INC.
DATE: 09-16-2011 AS REVISED THROUGH 10/10/11, SCALE: 1" = 40', SHEET UT-1, PREPARED BY F.A.
"UTILITY PLAN PREPARED FOR DORSET CROSSING, HOWMEADOW STREET, SIMSBURY, CONNECTICUT"2.
09-22-2023, SCALE: 1" = 100', PREPARED BY F.A. HESKETH & ASSOCIATES, INC.
DORSET CROSSING DRIVE, SIMSBURY, CONNECTICUT", DATE: 12-03-2021 AS REVISED THROUGH
"DORSET CROSSING PAD, MASTER DEVELOPMENT PLAN PREPARED FOR DORSET CROSSING, LLC,1.
16 SPACES
Page 29
S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
WG
S
S
GG
S
?
2622
CL&P
2623
CL&P
234
CL&P
3572
CL&P
4362
SNET
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
E
E
C
C
T
FLAG POLE
D
CONC. WALK
SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE: 1" = 20'
PROJECT NUMBER:
00222 - 001
20 0 20 40 60
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION
SHEET
DATE
REVISED
4/30/26
6/26/26
OF 2 6
REVISION SUMMARY
DORSET CROSSING PAD
MASTER DEVELOPMENT PLAN
PREPARED FOR
DIAMOND SPARKLE CAR WASH LLC, APPLICANT
DEVELOPMENT LAYOUT PLAN - LOT F
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)
LP
LP
L
P
L
P
LP
LP
L
P
L
P
LP
LP
LP
LP
LP
VAC
VAC
VAC
VAC
H
O
P
M
E
A
D
O
W
S
T
R
E
E
T
(C
T
R
O
U
T
E
10 &
202)
DORSET CROSSING DRIVE
V
A
C
V
A
C
V
A
C
V
A
C
V
A
C
V
A
C
V
A
C
EQUIPMENT
OFFICE
AUTOMATIC TUNNEL
TOUCHLESS
SELF 1
SELF 2
PLANNED AREA DEVELOPMENT (PAD)ZONE:
CAR WASHUSE:
50.6' SY
MATCH APPROVED
PARKING/DRIVE SETBACK
5'
10'
MATCH APPROVED
PARKING/DRIVE SETBACK
21.8' R
Y
AND ACCESS PLAN HAS BEEN APPROVED.
PARKING SIDE AND REAR YARD SETBACKS MAY BE REDUCED TO 0 FEET WHERE A UNIFIED PARKING2.
APPROVED INFORMATION OBTAINED FROM MAP REFERENCE 1, SHEET MA-1.1.
ZONING NOTES:
10'
10'
10'
45'-0"
25'-4"
25'-4"
38'-0"
11'-4"
24'-0"
70'-0"
6'-0"
22'-0"
10'-0"
45'-0" 30'-0"
26'-0"
19'-0"
15'-0"
11'-4"
14'-8"
22'-0"
2'-0"
6'-0"
COMPLIES< 40 FTUNKNOWN40 FTBLDG. HEIGHT
REDUCTION35,426 SF40,000 SFN/AIMP. COVERAGE
INCREASE7,275 SF7,000 SFN/ABLDG. COVERAGE
REDUCTION7,275 SF12,000 SFN/ABLDG. AREA
NO CHANGE5 FT5 FT10 FTREAR YARD[2]
NO CHANGE5 FT5 FT10 FTSIDE YARD[2]
NO CHANGE10 FT10 FT10 FTFRONT YARD
PARKING SETBACKS
COMPLIES21.8 FT±21.1 FT±20 FTREAR YARD
N/AN/AN/A10 FTACCESSORY
COMPLIES50.6 FT±9.0 FT±20 FTPRINCIPAL
SIDE YARD
COMPLIES23.7 FT±20 FTCANOPY
COMPLIES60.8 FT±20.0 FT±20 FTBUILDING
FRONT YARD
NO CHANGE460.7 FT±460.7 FT±100 FTLOT FRONTAGE
NO CHANGE47,419 SF (1.08 AC)47,419 SF (1.08 AC)10,000 SFLOT AREA
NOTESPROPOSEDAPPROVED[1]REQUIREDITEM
2'
PARKING/DRIVE SETBACK
5.67'
10'
10'
10'
10'
10'
10'
10'
10'
16'
16'
62.4' SY
60.8' F
Y
M
A
IN
B
U
IL
D
IN
G
A
B
C
D
E
F
G
H
I
J
LEGEND
K
L
Mixed Use Retail/Medical Office
Total 15,000 Square Feet
1 Story
BUILDING #2
CONNECTION (TYP.)
ACCESS/ROADWAY
POSSIBLE FUTURE
A
24'
18'
18'
13'
15'
13'
21.33'
13'
A
A
A
A
21.33' A
A
2'
18'
B
B
B
C
D
G
G
G
G
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
G
G
H
I
J
TRASH ENCLOSURE
STOP SIGN
HANDICAP PARKING SIGN
HANDICAP RAMP (8.33% MAX.)
CONCRETE SIDEWALK
CONCRETE CURB & WALK MONO.
EXT. CONCRETE CURB (START/END)
BIT. CONCRETE CURB (START/END)
STOP BAR (12" WHITE)
LANE STRIPING (4" WHITE)
PARKING PAINT STRIPING (4" WHITE)
BITUMINOUS CONCRETE DRIVE
K
L
E
X
IS
T
IN
G
D
R
IV
E
W
A
Y
AREA = 750 SF±
CANOPY LIMITS
PAY STATION
LIGHT FIXTURE (TYP. OF 12)
15' HIGH POLE MOUNTED
EXISTING LIGHT FIXTURE (TYP.)
HANDICAP PARKING MARKING
WALL PACK (FULL CUTOFF)
POLE MOUNTED LIGHT FIXTURE
HAYBALE
SILT FENCE
TELECOMMUNICATIONS
ELECTRIC
GAS SERVICE
WATER
SANITARY SEWER
CURTAIN/SLOPE/WALL DRAIN
ROOF LEADER
DRAINAGE PIPE
CONCRETE WALK & CURB MONO.
CONCRETE WALK
SAWCUT PAVEMENT
EDGE OF PAVEMENT W/ CURB
14'-8"
4'-0"
DETAIL
DRAINAGE EASEMENT
EASEMENT
EASEMENT
FAVOR OF CL&P
EASEMENT IN
OF AQUARION
EASEMENT IN FAVOR
TOWN OF SIMSBURY
EASEMENT IN FAVOR OF
8'
8'
9'
9'
9'
13'
A
A
5 S
P
A
C
E
S
(V
A
C
.)
4 SPACES (VAC.)
18'
COMPLIES1 SP (1 VAN)1 SP (1 VAN)161 SP / 1-25 SPDEVELOPMENT TOTAL
ACCESSIBLE PARKING
COMPLIES16 SPACES5 SPACESTOTAL
11 SPACESN/AN/AN/APATRONS / VACUUM
3 SPACES3 SPACES31 SP / EMP.CAR WASH
2 SPACES2 SPACES2722.5 SP / 500 SFOFFICE
PARKING SPACES
NOTESPROPOSEDREQUIREDUNITSTANDARDITEM
GENERAL SITE NOTES
ACCESSIBLITY REQUIREMENTS.
CONTRACTOR TO CONFIRM WITH LOCAL CODES AND BUILDING INSPECTOR FOR SPECIFIC HANDICAPPED10.
COMPACTION.
GRANULAR BACKFILL. REFER TO GEOTECHNICAL REPORT FOR TYPE OF FILL TO ACHIEVE DESIRED
CONTRACTOR SHALL COMPLETELY FILL ALL TRENCHES WITHIN 5 FEET OF PAVEMENT EDGES WITH9.
TO THE OWNER.
CONSTRUCTION BY THE CONTRACTOR, HIS SUBCONTRACTORS OR SUPPLIERS AT NO ADDITIONAL COST
CONTRACTOR SHALL REPAIR, RESURFACE, RECONSTRUCT OR REFURBISH ANY AREAS DAMAGED DURING8.
ASPHALT.
WITH FORM 819, TOWN OF SIMSBURY OR DOT STANDARDS WHERE NEW ASPHALT JOINS EXISTING
CONTRACTOR SHALL SEAL EDGE OF EXISTING ASPHALT PAVEMENT WITH TACK COAT IN ACCORDANCE7.
PROJECT LANDSCAPE ARCHITECT.
SEED SHALL BE APPLIED AT THE MINIMUM RATE RECOMMENDED BY THE MANUFACTURER OR THE
CONTRACTOR SHALL SUPPLY AND PLACE STRAW MULCH WHEREVER GRASS SEED HAS BEEN PLACED.6.
1" BELOW TOPS OF CURBS, WALKS, OR PAVEMENT ELEVATIONS WHERE TOPSOIL ABUTS THOSE AREAS.
OR AS DIRECTED BY THE PROJECT LANDSCAPE ARCHITECT. TOP OF TOPSOIL LAYER SHALL BE PLACED
OTHERWISE NOTED. ALL NEW SEEDED OR SODDED AREAS SHALL HAVE A TOPSOIL LAYER OF 4" MINIMUM
ALL DISTURBED AREAS SHALL BE SEEDED OR SODDED AFTER FINISH GRADING IS COMPLETED UNLESS5.
FEATURES AS NECESSARY.
CONTRACTOR SHALL PROVIDE SMOOTH TRANSITIONS FROM PROPOSED FEATURES TO EXISTING4.
REPRESENTATIVE IMMEDIATELY.
DISCREPANCIES BETWEEN THE PLANS AND ACTUAL FIELD CONDITIONS TO THE OWNER OR OWNER'S
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS AND SHALL REPORT ANY
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO THE START OF CONSTRUCTION.3.
OR OTHER LIMITS AS DEPICTED ON THE PLAN.
ALL DIMENSIONS ARE TO THE EDGE OF PAVEMENT, FACE OF CURBS, OUTSIDE FACE OF THE BUILDING2.
CONSTRUCTION FORM 819 AS APPLICABLE AND THE TOWN OF SIMSBURY STANDARD SPECIFICATIONS.
TRANSPORTATION STANDARD SPECIFICATIONS FOR ROADS, BRIDGES, FACILITIES AND INCIDENTAL
ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE STATE OF CONNECTICUT DEPARTMENT OF1.
23.7' F
Y
C
A
N
O
P
Y
63.0' F
Y
M
A
IN
B
U
IL
D
IN
G
18'
24'
15.5'
F
H
5'
4'
10'
FF = 201.50
AREA = 7,275 SF±
CAR WASH
1 STORY
BUILDING #1
DESIGN BY OTHERS
MONUMENT SIGN
DIAMOND SPARKLE
ZONING TABLE LOT F
PARKING TABLE LOT F
PARKING SPACE REQUIREMENTS PER SECTION 10.2.4USE:
6 S
P
A
C
E
S
(2 V
A
C
. / 1 H
A
V
A
N
)
(TYP. OF 6)
MOUNT VACUUM
DUAL HEAD POSTPage 30
S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
WG
S
S
GG
S
?
2622
CL&P
2623
CL&P
234
CL&P
3572
CL&P
4362
SNET
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
E
E
C
C
T
FLAG POLE
D
CONC. WALK
SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE: 1" = 20'
PROJECT NUMBER:
00222 - 001
20 0 20 40 60
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION
SHEET
DATE
REVISED
5/18/26
6/26/26
OF 3 6
REVISION SUMMARY
DORSET CROSSING PAD
MASTER DEVELOPMENT PLAN
PREPARED FOR
DIAMOND SPARKLE CAR WASH LLC, APPLICANT
GRADING & DRAINAGE PLAN
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)
+201.50
+
201.50
+201.25
+
201.25
+200.60
+201.10
+201.20
+
201.50
+
201.80
+200.50
+
201.05
+201.20
+200.10
+ 199.20
+200.70
+
200.75
+
201.20
+
201.25
+200.55
+200.10
+
201.05
+
200.50
+
200.50
+
199.20
+
200.80
+
200.80
+
200.80
+200.85
+
201.60
+
202.00
+
202.00
198
200
200
198
200
200
200
202
201
201
201
202
201
LP
L
P
L
P
LP
LP
L
P
L
P
LP
LP
LP
LP
LP
H
O
P
M
E
A
D
O
W
S
T
R
E
E
T
(C
T
R
O
U
T
E
10 &
202)
DORSET CROSSING DRIVE
Mixed Use Retail/Medical Office
Total 15,000 Square Feet
1 Story
BUILDING #2
CONNECTION (TYP.)
ACCESS/ROADWAY
POSSIBLE FUTURE
DRAINAGE EASEMENT
EASEMENT
FAVOR OF CL&P
EASEMENT IN
OF AQUARION
EASEMENT IN FAVOR
TOWN OF SIMSBURY
EASEMENT IN FAVOR OF
FL = 193.65 (8")
TF = 202.94
EX. SMH
FL = 187.40 (8")
TF = 198.49
EX. SMH
250' - 8" P
V
C
@
0.025
FF = 201.50
CAR WASH
1 STORY
BUILDING #1
UTILITY STATEMENT
4455, IN ACCORDANCE WITH CBYD NOTIFICATION PROCEDURES PRIOR TO COMMENCING WORK.
AUTHORITIES PRIOR TO CONSTRUCTION. CONTRACTOR TO NOTIFY "CALL BEFORE YOU DIG" AT 1-800-922-
EXISTENCE OF ALL SUCH FEATURES MUST BE FIELD DETERMINED AND VERIFIED BY THE APPROPRIATE
IN NATURE. ADDITIONALLY, OTHER SUCH FEATURES MAY EXIST ON THE SITE. THE SIZE, LOCATION AND
IN THE AREA, EITHER IN-SERVICE OR ABANDONED. THESE LOCATIONS MUST BE CONSIDERED APPROXIMATE
THIS PLAN SET MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES COMPRISE ALL SUCH UTILITIES
GOVERNMENT AGENCIES, PAROLE TESTIMONY, FIELD SURVEY AND OTHER SOURCES. THE SURVEYOR AND
COMPILED, IN PART, FROM RECORD MAPPING SUPPLIED BY THE RESPECTED UTILITY COMPANIES OR
UNDERGROUND UTILITY, STRUCTURE AND FACILITY LOCATIONS DEPICTED AND NOTED HEREON HAVE BEEN
STUBS PER MAP REF. 2 (VIF)
EXISTING 6" FIRE & 4" DOMESTIC
EXISTING GAS VALVE (VIF)
T
FL(NE) = 196.25 (NEW)
FL(W) = 196.25 (EX.)
TF = 199.10 (NEW)
TF = 198.37 (EX.)
EX. CB-C #F-100
FL(E) = 187.65 (EX.)
TF = 200.70 (NEW)
TF = 201.37 (EX.)
EX. SMH #F-200
FL(W) = 196.32 (EX.)
TF = 200.50 (NEW)
TF = 200.91 (EX.)
EX. CB-C #F-204
FL(S) = 190.88 (EX.)
TF = 201.05 (NEW)
TF = 201.97 (EX.)
EX. SMH #F-201
FL(N) = 190.74 (EX.)
FL(SW) = 191.19 (EX.)
FL(SE) = 190.70 (EX.)
FL(NE) = 196.03 (EX.)
TF = 201.20 (NEW)
TF = 201.88 (EX.)
EX. SMH #F-203
FL(NE) = 191.61 (EX.)
FL(W) = 191.60 (EX.)
TF = 200.10 (NEW)
TF = 200.70 (EX.)
EX. CB-C #F-205
FL(E) = 192.12 (EX.)
FL(S) = 192.09 (EX.)
TF = 199.10 (NEW)
TF = 200.67 (EX.)
EX. CB-C #F-206
@ 0.6%
26 LF - 12" HDPE
FL = 196.40
TF = 199.65
PR. DMH #F-101
@ 0.7%
22 LF - 8" HDPE
FL(E) = 193.80 (24")
FL(W) = 196.55 (12")
TF = 200.05
PR. DMH #F-103
@ 0.9%
110 LF - 12" HDPE
FL(W) = 193.80 (24")
FL(N) = 196.55 (8")
TF = 199.75
PR. DMH #F-104
FL = 197.90 (8")
TF = 200.90
PR. YD #F-106
@ 1.0%
65 LF - 8" HDPE
FL = 197.25 (8")
TF = 200.25
PR. YD #F-105
@ 2.5%
28 LF - 8" HDPE
@ 0.5%
40 LF - 8" HDPE
FL(SE) = 197.80 (NEW)
FL(W) = 197.60 (EX.)
FL(NE) = 197.79 (EX.)
TF = 202.01 (EX.)
EX. CB-C #F-300
FL(N) = 190.73 (EX.)
FL(S) = 190.76 (EX.)
TF = 201.10 (NEW)
TF = 202.01 (EX.)
CONTECH STC 900
EX. STS #F-202
GRADING NOTES
FLOW LINE ELEVATIONS GIVEN AT END OF PIPE SECTIONS.10.
ON THE PLANS.
SEE APPROPRIATE DETAILS TO DETERMINE SUBGRADE ELEVATIONS BELOW FINISH GRADE INDICATED9.
ALL PROPOSED SPOT ELEVATIONS ARE THE FINAL PAVEMENT AND FINAL GRADE ELEVATIONS.8.
AND CORRECT IF ANY, "BIRD BATH" CONDITIONS.
PROVIDE POSITIVE DRAINAGE WITHOUT PONDING. AFTER INSTALLATION, CONTRACTOR TO TEST FOR,7.
PARKING AREAS WILL BE DETERMINED AT THE TIME OF CONSTRUCTION.
NECESSITY FOR SUBDRAINS AND/OR REMOVAL OF ANY UNSUITABLE MATERIAL WITHIN THE PROPOSED
WEIGHT ROLLER TO DETERMINE LOCATIONS OF ANY POCKETS OF UNSUITABLE MATERIAL. THE
AFTER REMOVING PAVEMENT AND/OR STRIPPING TOPSOIL MATERIAL, PROOFROLL WITH A MEDIUM6.
GRANULAR MATERIAL IF WITHIN 5 FEET OF PAVEMENT OR CONCRETE.
TRENCHES FOR ALL STORM DRAIN LINES SHALL BE BACKFILLED COMPLETELY WITH ENGINEERED5.
CONSTRUCTION.
NOTIFY THE UTILITY COMPANY SO A REPRESENTATIVE IS PRESENT TO INSTRUCT AND OBSERVE DURING
COMPANIES. WHEN EXCAVATING IS AROUND OR OVER EXISTING UTILITIES, THE CONTRACTOR MUST
ON SITE. ALL VERIFICATIONS (LOCATION, SIZE AND DEPTH) SHALL BE MADE BY THE APPROPRIATE UTILITY
START, OR AS REQUIRED BY GOVERNING UTILITY COMPANY, TO VERIFY IF ANY UTILITIES ARE PRESENT
THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES 72 HOURS BEFORE CONSTRUCTION IS TO4.
AND/OR COMPANIES SO AS NOT TO CAUSE DAMAGE.
EXISTING UTILITY LINES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTORS
THE EXCAVATING CONTRACTOR SHALL TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND3.
REPRESENTATIVE IMMEDIATELY.
DISCREPANCIES BETWEEN THE PLANS AND ACTUAL FIELD CONDITIONS TO THE OWNER OR OWNER'S
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS AND SHALL REPORT ANY
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO THE START OF CONSTRUCTION.2.
BE PERFORMED IN ACCORDANCE WITH THE TOWN OF SIMSBURY STANDARD SPECIFICATIONS.
CONSTRUCTION FORM 819 AS APPLICABLE. WORK WITHIN THE DORSET CROSSING RIGHT-OF-WAY SHALL
TRANSPORTATION STANDARD SPECIFICATIONS FOR ROADS, BRIDGES, FACILITIES AND INCIDENTAL
ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE STATE OF CONNECTICUT DEPARTMENT OF1.
DRAINAGE
STORMWATER O & M
BOTTOM STONE = 192.90±
BOTTOM CHAMBERS = 193.65±
16 CHAMBERS (2 ROWS X 8 UNITS)
SUBSURFACE INFILTRATION SYSTEM
PROPOSED STORMTECH MC-3500
TOP CHAMBERS = 192.29±
BOTTOM CHAMBERS = 187.02±
48 MODULES (4 ROWS X 12 UNITS)
SYSTEM WITH DURA-SKRIM LINER
EXISTING 'RETAIN IT' DETENTION
RL FL = 199.80
RL FL = 199.80
LEADER @ 1.0% (TYP.)
190 LF PVC ROOF
FL(E) = 197.06
FL(W) = 197.01
TF = 201.86
EX. CB-C
FL(SE & NW) = 197.54
FL(N) = 199.23
TF = 202.17
EX. CB-C
FL = 196.13
TF = 199.22
EX. CB-C
FL(W) = 195.74
FL(N) = 195.76
TF = 198.99
EX. CB-C
FL(N) = 192.29
TF = 196.09
EX. CB-C
FL(N) = 192.11
FL(S) = 192.22
TF = 196.01
EX. CB-C
FL = 198.28
TF = 201.04
EX. CB-C
EASEMENT
FL = 197.35
TF = 200.50
48" SUMP W/ HOOD
PR. CB-CL #F-102
FL = 198.00
TF = 200.85
48" SUMP W/ HOOD
PR. CB-CL #F-301
E
X
IS
T
IN
G
D
R
IV
E
W
A
Y
MANUFACTURER'S RECOMMENDATIONS.
STORMTECH MC-3500 UNITS TO BE INSPECTED AND MAINTAINED IN ACCORDANCE WITH THED.
REMOVE SAND, SALT AND OTHER DEBRIS FROM THE WINTER MAINTENANCE SEASON.
ACCESS DRIVES, PARKING AREAS AND SIDEWALKS SHALL BE SWEPT ANNUALLY EACH SPRING TOC.
DIVERTS FLOW SHALL BE REMOVED AND DISPOSED OF IN AN APPROVED MANNER.
FOLIAGE CLEANUP AND A SECOND TIME DURING SPRING CLEANUP. ALL DEBRIS THAT OBSTRUCTS OR
INSPECT EACH VEGETATED/LANDSCAPED AREA TWICE ANNUALLY, ONCE IN THE FALL AS PART OFB.
IN AN APPROVED MANNER.
FOLLOWING THE WINTER SEASON. REMOVE ALL COLLECTED SEDIMENT AND DEBRIS AND DISPOSE OF
INSPECT EACH CATCH BASIN AND STORMWATER TREATMENT STRUCTURE ANNUALLY IN THE SPRINGA.
THE FOLLOWING MAINTENANCE SHALL BE PERFORMED AND A MAINTENANCE LOG COMPLETED.2.
OWNER & PARTY RESPONSIBLE FOR OPERATION AND MAINTENANCE: DIAMOND SPARKLE CAR WASH, LLC1.
MANAGEMENT SYSTEMS FUNCTION AS DESIGNED.
THE FOLLOWING OPERATION & MAINTENANCE PLAN SHALL BE IMPLEMENTED TO ENSURE THAT STORMWATER
LEADER @ 1.0% (TYP.)
165 LF PVC ROOF
FL = 194.15
6" INSERTA TEE
ACCORDANCE WITH THE 2024 STORMWATER QUALITY MANUAL.
TREATMENT HAS BEEN DESIGN AND IMPLEMENTED TO THE MAXIMUM EXTENT ACHIEVABLE INF.
BEEN INSTALLED, AND NO OTHER PRETREATMENT BMP'S ARE FEASIBLE.
CONNECTED TO A DOWNSTREAM SYSTEM WHERE OTHER TREATMENT PRACTICES HAVE ALREADY
A CONTRIBUTING DRAINAGE AREA OF 0.16 ACRES (<0.25), IS IN AN OFFLINE CONFIGURATION, IS
CATCH BASIN #F-301 WILL BE INSTALLED WITH A DEEP SUMP (48") AND A HOOD. THE BASIN HASE.
BEEN INSTALLED, AND NO OTHER PRETREATMENT BMP'S ARE FEASIBLE.
CONNECTED TO A DOWNSTREAM SYSTEM WHERE OTHER TREATMENT PRACTICES HAVE ALREADY
A CONTRIBUTING DRAINAGE AREA OF 0.13 ACRES (<0.25), IS IN AN OFFLINE CONFIGURATION, IS
CATCH BASIN #F-102 WILL BE INSTALLED WITH A DEEP SUMP (48") AND A HOOD. THE BASIN HASD.
CALCULATED WQF RATE OF 1.0 CFS.
MAXIMUM WATER QUALITY FLOW (WQF) TREATMENT RATE OF 1.4 CFS, WHICH EXCEEDS THE
CONTECH STC 900 HYDRODYNAMIC SEPARATOR. THE EXISTING TREATMENT STRUCTURE HAS A
EXISTING 200 SERIES COLLECTION STRUCTURES WILL DISCHARGE THROUGH AN EXISTINGC.
INFILTRATE THE CALCULATED WATER QUALITY VOLUME (WQV) EQUIVALENT TO 1.3" OF RAINFALL.
TO A STORMTECH MC-3500 SUBSURFACE INFILTRATION SYSTEM SIZED TO FULLY RETAIN AND
CLEAN RUNOFF FROM THE ROOF AND ADJACENT LANDSCAPED RAIN GARDENS WILL DISCHARGEB.
ALL CATCH BASINS SHALL HAVE 24" (MIN.) SUMPS EXCEPT AS NOTED.A.
STORMWATER RUNOFF FROM ALL NEW IMPERVIOUS SURFACES WILL BE TREATED AS FOLLOWS:3.
DISCHARGING OFF-SITE AS COMPARED TO THE APPROVED PAD DEVELOPMENT.
THERE WILL BE NO NET INCREASE IN PEAK FLOW RATES FOR THE 1-YEAR THROUGH 100-YEAR STORM2.
SITE VIA CONNECTION TO THE EXISTING COLLECTION SYSTEMS ON SITE.
A SERIES OF ROOF LEADERS, YARD DRAINS, CATCH BASINS & DRAINAGE PIPING AND DISCHARGED OFF
STORMWATER RUNOFF FROM THE PROPOSED DEVELOPMENT OF LOT F WILL BE COLLECTED THROUGH2.
FURNISHING MATERIALS.
THE CONTRACTOR SHALL CONFIRM ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO ORDERING AND/OR
OF THE ORIGINAL DORSET CROSSING PAD MASTER DEVELOPMENT PLAN. SEE MAP REFERENCES 1 & 2.
THE DRAINAGE SYSTEM SERVING LOT F HAS BEEN PARTIALLY INSTALLED AS PART OF THE CONSTRUCTION1.Page 31
S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
WG
S
S
GG
S
?
2622
CL&P
2623
CL&P
234
CL&P
3572
CL&P
4362
SNET
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
E
E
C
C
T
FLAG POLE
D
CONC. WALK
SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE: 1" = 20'
PROJECT NUMBER:
00222 - 001
20 0 20 40 60
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION
SHEET
DATE
REVISED
5/18/26
6/26/26
OF 4 6
REVISION SUMMARY
DORSET CROSSING PAD
MASTER DEVELOPMENT PLAN
PREPARED FOR
DIAMOND SPARKLE CAR WASH LLC, APPLICANT
UTILITY PLAN
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)
+201.50
+
201.50
+201.25
+
201.25
+200.60
+201.10
+201.20
+
201.50
+
201.80
+200.50
+
201.05
+201.20
+200.10
+ 199.20
+200.70
+
200.75
+
201.20
+
201.25
+200.55
+200.10
+
201.05
+
200.50
+
200.50
+
199.20
+
200.80
+
200.80
+
200.80
+200.85
+
201.60
+
202.00
+
202.00
198
200
200
198
200
200
200
202
201
201
201
202
201
LP
L
P
L
P
LP
LP
L
P
L
P
LP
LP
LP
LP
LP
H
O
P
M
E
A
D
O
W
S
T
R
E
E
T
(C
T
R
O
U
T
E
10 &
202)
DORSET CROSSING DRIVE
Mixed Use Retail/Medical Office
Total 15,000 Square Feet
1 Story
BUILDING #2
CONNECTION (TYP.)
ACCESS/ROADWAY
POSSIBLE FUTURE
DRAINAGE EASEMENT
EASEMENT
EASEMENT
FAVOR OF CL&P
EASEMENT IN
OF AQUARION
EASEMENT IN FAVOR
TOWN OF SIMSBURY
EASEMENT IN FAVOR OF
FL = 193.65 (8")
TF = 202.94
EX. SMH
FL = 187.40 (8")
TF = 198.49
EX. SMH
FF = 201.50
CAR WASH
1 STORY
BUILDING #1
ROOM
UTILITY
METER
ELECTRIC
METER
GAS
EXISTING TRANSFORMER
E
X
IS
T
IN
G
D
R
IV
E
W
A
Y
UTILITY STATEMENT
4455, IN ACCORDANCE WITH CBYD NOTIFICATION PROCEDURES PRIOR TO COMMENCING WORK.
AUTHORITIES PRIOR TO CONSTRUCTION. CONTRACTOR TO NOTIFY "CALL BEFORE YOU DIG" AT 1-800-922-
EXISTENCE OF ALL SUCH FEATURES MUST BE FIELD DETERMINED AND VERIFIED BY THE APPROPRIATE
IN NATURE. ADDITIONALLY, OTHER SUCH FEATURES MAY EXIST ON THE SITE. THE SIZE, LOCATION AND
IN THE AREA, EITHER IN-SERVICE OR ABANDONED. THESE LOCATIONS MUST BE CONSIDERED APPROXIMATE
THIS PLAN SET MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES COMPRISE ALL SUCH UTILITIES
GOVERNMENT AGENCIES, PAROLE TESTIMONY, FIELD SURVEY AND OTHER SOURCES. THE SURVEYOR AND
COMPILED, IN PART, FROM RECORD MAPPING SUPPLIED BY THE RESPECTED UTILITY COMPANIES OR
UNDERGROUND UTILITY, STRUCTURE AND FACILITY LOCATIONS DEPICTED AND NOTED HEREON HAVE BEEN
UTILITY NOTES
WATER NOTES
SANITARY NOTES
ELECTRIC & TELECOMMUNICATIONS
GAS
FOR CLARITY PIPES MAY NOT BE DRAWN TO SCALE OR EXACTLY LOCATED.5.
THE INFORMATION ON THE DRAWINGS.
FIELD VERIFIED. NOTIFICATION SHALL BE GIVEN TO THE OWNER IF THE FIELD VERIFICATION DIFFERS FROM
IS IN THE VICINITY OF EXISTING PIPING, THE LOCATION AND ELEVATION OF THE EXISTING PIPING SHALL BE
WHEN CONNECTIONS ARE TO BE MADE TO EXISTING PIPING AND STRUCTURES OR WHERE CONSTRUCTION4.
BE CONTACTED BY THE CONTRACTOR.
BEFORE WORKING WITH OR AROUND EXISTING UTILITIES, THE APPROPRIATE UTILITY COMPANY SHALL3.
THE CONTRACTOR, AT HIS EXPENSE WITH THE PERMISSION OF THE OWNER.
CONSTRUCTION WITHOUT UNDUE INTERRUPTION OF SERVICE MAY BE REMOVED AND REPLACED BY
UNLESS OTHERWISE INDICATED ON THE DRAWINGS. ANY PIPING WHICH CAN BE REMOVED DURING
LOCATE AND MAINTAIN IN SERVICE ALL EXISTING UTILITIES ENCOUNTERED DURING CONSTRUCTION
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE AND ORDER ALL NEW SERVICES,2.
SPECIFICATIONS AND DETAILS OF THE APPROPRIATE PUBLIC UTILITY COMPANY.
ALL UNDERGROUND UTILITIES MUST BE INSTALLED IN ACCORDANCE WITH THE STANDARDS,1.
FINAL CONNECTION LOCATION SUBJECT TO REVIEW AND APPROVAL BY EVERSOURCE.
NEW BUILDING BY A CONNECTION TO THE EXISTING TRANSFORMER ON THE WESTERLY PROPERTY LINE.
NEW ELECTRIC & TELECOMMUNICATIONS SERVICES SHALL BE PROVIDED TO THE UTILITY ROOM IN THE1.
CONNECTICUT NATURAL GAS.
NORTHWEST CORNER OF THE SITE. CONNECTION LOCATION AND SIZE TO BE REVIEWED AND APPROVED
THE NEW BUILDING SHALL BE SERVED BY A NEW GAS CONNECTION TO AN EXISTING STUB AT THE2.
THE CONTRACTOR PRIOR TO INSTALLING GAS SERVICES.
THE LOCATION, SIZE, AND DEPTH OF ALL CONNECTION POINTS SHALL BE VERIFIED IN THE FIELD BY1.
STUBS PER MAP REF. 2 (VIF)
EXISTING 6" FIRE & 4" DOMESTIC
EXISTING GAS VALVE (VIF)
8" CLDIP WATER MAIN
12" CLDIP WATER MAIN
TOWN OF SIMSBURY.
COMPANY OF CONNECTICUT RULES AND REGULATIONS DATED JULY 31, 2024, AS AMENDED AND THE
ALL MATERIALS AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE AQUARION WATER5.
(SDR 26) PIPE WITH GASKETED, COMPRESSION-TYPE JOINTS WITHIN 10 FEET OF THE WATER LINE.
CONSTRUCTED OF WATER WORKS GRADE DUCTILE IRON PIPE WITH MECHANICAL JOINTS OR PVC
SANITARY SEWER LINES. IF 18 INCHES OF CLEARANCE IS NOT PROVIDED THEN THE SEWER MUST BE
A MINIMUM OF 18 INCHES OF VERTICAL CLEARANCE SHALL BE PROVIDED BETWEEN NEW WATER AND4.
ALL NEW WATER LINES SHALL HAVE A MINIMUM OF 54" OF COVER.3.
CONFORM TO CLASS 52 CONFORMING TO AWWA C151.
AT THE NORTHWEST CORNER OF THE SITE TO THE UTILITY ROOM IN THE NEW BUILDING. PIPE SHALL
A NEW 4"Ø CLDIP DOMESTIC WATER SERVICE SHALL BE INSTALLED FROM THE EXISTING SERVICES STUB3.
CONFORMING TO AWWA C151.
THE SITE TO THE SPRINKLER ROOM IN THE NEW BUILDING. PIPE SHALL CONFORM TO CLASS 52
SERVICE SHALL BE INSTALLED FROM THE EXISTING SERVICE STUB AT THE NORTHWEST CORNER OF
FIRE/SPRINKLER SERVICES FOR THE CAR WASH ARE NOT REQUIRED. IF REQUIRED THE NEW FIRE2.
THE CONTRACTOR PRIOR TO ORDERING, FURNISHING, OR INSTALLING WATER SERVICES.
THE LOCATION, SIZE, AND DEPTH OF ALL CONNECTION POINTS SHALL BE VERIFIED IN THE FIELD BY1.
FL (CALC) = 190.7± (VIF)
LATERAL PER MAP REF. 2.
EXISTING 6" PVC SANITARY SERVICE
SIZE TO BE CONFIRMED BY MEP
4" DOMESTIC WATER SERVICE
T
FL (CALC) = 191.2± (VIF)
STUB PER MAP REF. 2.
EXISTING 6" PVC SANITARY
6" FL = 196.5±
6" FL = 198.0±
6" FL = 198.0±
6" FL = 198.0±
6" FL = 198.0±
ELECTRIC & TELECOMM SERVICE
GAS SERVICE
@ 0.070 FT/FT
45 LF - 8"Ø PVC (SDR35)
@ 0.083 FT/FT
26 LF - 8"Ø PVC (SDR35)
FL(OUT) = 194.25
FL(IN) = 194.35
TF = 201.25
SMH #1
FL(OUT) = 197.00
FL(IN) = 197.10
TF = 201.45
SMH #2
FL(OUT) = 197.65
FL(IN) = 197.85
TF = 201.45
SMH #3
DESIGN BY OTHERS
WATER RECOVERY SYSTEM
ADAWF, MAX. DAILY, AND PEAK DEMAND TO BE CONFIRMED BY MEP.C.
CALCULATED ADAWF = 31,940 GPDB.
WASH FACILITY IN COLCHESTER, CT WITH GROWTH FACTOR = 1.36 AND FACTOR OF SAFETY = 1.50.
AVERAGE DAILY FLOW CALCULATED BASED ON METER FLOW READINGS FROM DIAMOND SPARKLE CARA.
SANITARY SEWER FLOW CALCULATIONS:5.
POLLUTION CONTROL AUTHORITY RULES AND REGULATIONS.
ALL MATERIALS AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE TOWN OF SIMSBURY WATER4.
THE DOWNSTREAM DIRECTION OF THE MAIN SHALL BE MADE.
SEWER MAIN IS REQUIRED, A SADDLE OR OTHER APPROVED CONNECTION METHOD AT AN ANGLE OF 45° IN
DIRECT CONNECTION TO THE EXISTING SEWER STUB SHALL BE MADE. IF DIRECT CONNECTION TO THE3.
PIPE SLOPE SHALL BE 2% AND THE MAXIMUM PIPE SLOPE SHALL BE 10%
CONFORM TO ASTM D2241 AND SHALL MEET THE DEFLECTION STANDARDS OF ASTM D3303. THE MINIMUM
AN EXISTING 6" STUB IN THE 8" PVC SEWER MAIN IN THE DRIVEWAY TO THE WEST. THE PIPE SHALL
THE NEW BUILDING WILL BE SERVED BY A 6"Ø PVC (SDR 35) SANITARY SEWER LATERAL CONNECTING TO2.
THE CONTRACTOR PRIOR TO ORDERING, FURNISHING, OR INSTALLING SEWER SERVICES.
THE LOCATION, SIZE, TYPE, AND DEPTH OF ALL CONNECTION POINTS SHALL BE VERIFIED IN THE FIELD BY1.
FL = 185.09 (8")
TF = 197.39
EX. SMH
FL = 184.11 (8")
TF = 196.63
EX. SMH
TF = 193.81
EX. SMH
REMOVED OR ABANDONED
WATER PIPE STUBS TO BE
EXISTING FIRE AND DOMESTIC
250' - 8" P
V
C
@
0.025Page 32
NOTES:
1. INSTALL PER MANUFACTURER
SPECIFICATIONS.
2. INSPECT PER EROSION CONTROL
NOTES OR AS DIRECTED.
3. REMOVE SEDIMENT WHEN BAG
IS HALF FULL AND DEPOSIT PER
EROSION CONTROL NOTES.
4. REPAIR OR REPLACE WITHIN 24
HOURS OF OBSERVED FAILURE.
S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
E
E
C
T
FLAG POLE
CONC. WALK
ANTI-TRACKING PAD DETAIL
SOIL STOCKPILE DETAIL
SECTIONELEVATION
SILT FENCE
INLET SEDIMENT
CONTROL DEVICE
TEMPORARY SEDIMENT TRAP (TST) SIZING
PLAN
TEMPORARY SEDIMENT TRAP
OUTLET SECTION
SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE: 1" = 20'
PROJECT NUMBER:
00222 - 001
20 0 20 40 60
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION
SHEET
DATE
REVISED
5/18/26
6/26/26
OF 5 6
REVISION SUMMARY
DORSET CROSSING PAD
MASTER DEVELOPMENT PLAN
PREPARED FOR
DIAMOND SPARKLE CAR WASH LLC, APPLICANT
EROSION & SEDIMENTATION CONTROL PLAN
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)
38C
NRCS
38C
NRCS
38C
NRCS 34A
NRCS
34A
NRCS
34B
NRCS
198
200
200
198
200
200
200
202
201
201
201
202
201
DORSET CROSSING DRIVE
SEE PLAN FOR WIDTH
NOT TO SCALE
COMPACTED SUBGRADE
50'-0" MIN. LENGTH
ROAD
6" CTDOT 2" STONE
FOR LOW SOIL BEARING CAPACITY
USE MIRAFLEX 600X OR EQUAL
2 MAX
3
NOT TO SCALE
MATERIAL STOCKPILE
FLOW
(TYP.)
STOCKPILE (TYP.)
OF MATERIAL
AROUND PERIMETER
SYSTEM PLACED
EROSION CONTROL
NOT TO SCALE
FLOW
3'-0" M IN.
NOTES:
1. INSTALL SILT FENCE & WOOD STAKES AS RECOMMENDED BY MANUFACTURER.
2. SILT FENCE SUBJECT TO HEAVY LOADS SHALL BE REINFORCED WITH FARM FENCING & STEEL
POSTS (0.5 # STEEL/L.F.). THE MINIMUM POST LENGTH SHALL BE 5'-0".
3. SILT FENCE FABRIC SHALL BE A PERVIOUS SHEET OF WOVEN PROPYLENE, NYLON, POLYESTER
OR POLYETHYLENE FILAMENTS AND SHALL BE CERTIFIED BY THE MANUFACTURER OR SUPPLIER.
2'-6" M
IN
.
12" M
IN
.
100°
10'-0" MAX.
6" M IN.
GRADE
FINISH
GRADE
FINISH
FENCE (SEE NOTE 2)
ATTACHED TO WIRE
SILT FENCE FABRIC
SELF-SUPPORTING
BACKFILL
RECOMPACTED
GROUND
FABRIC BELOW
EXTEND 6" OF
(MIN. LENGTH: 3' - 6')
1" x 2" WOOD STAKE
NOT TO SCALE
DUMPING STRAPS
STORM GRATE CURB OPENING
SILT SACK
LIFT STRAPS
CURB FILTER
PORTS
OUTFLOW
OPTIONAL
CT DOT #3 STONE
GEOTEXTILE FABRIC
MODIFIED RIPRAP
HAYBALES
DIVERTED RUNOFF
OUTLET
NOT TO SCALE
W
L
VARIES2'
1' M IN.
5' M AX.
1.5
1
1
2
1
2
2
1
WEIR
SOIL BERM
TST AREA (AC) REQUIRED WET VOL. DRY VOL.
(ACRE) VOL. (CY) (CY) (CY)
1 1 134 67 67
18" DRY VOLUM E
18" W ET VOLUM E
Mixed Use Retail/Medical Office
Total 15,000 Square Feet
1 Story
BUILDING #2
FF = 201.50
CAR WASH
1 STORY
BUILDING #1
8" CLDIP WATER MAIN
T
250' - 8" P
V
C
@
0.025
GENERAL CONSTRUCTION NOTES
SEQUENCE OF CONSTRUCTION
E & S CONTROL NARRATIVE
EROSION & SEDIMENT CONTROL PLAN
E & S CONTROL NOTES
INSPECTION AND MAINTENANCE
SIMSBURY AND THE STATE OF CONNECTICUT.
THE CONTRACTOR SHALL CONFORM TO ALL REQUIREMENTS OF ALL LOCAL AGENCIES OF THE TOWN OF2.
TO BE PERFORMED.
THE CONTRACTOR IS REQUIRED TO OBTAIN ALL NECESSARY LOCAL AND STATE PERMITS FOR THE WORK1.
REMOVE E&S CONTROLS WHEN PERMANENT VEGETATIVE COVER IS ESTABLISHED.11.
FINISH GRADE, SPREAD TOPSOIL, SEED, AND COMPLETE PLANTING.10.
INSTALL BITUMINOUS CONCRETE & CURBING.9.
CONSTRUCT ACCESS DRIVES, PARKING AREAS & WALKS.8.
INSTALL UTILITIES AND STORM DRAINAGE.7.
INSTALL FOUNDATION & ERECT BUILDING.6.
EXCAVATE, PLACE FILL AND ROUGH GRADE SITE.5.
STRIP & STOCKPILE TOPSOIL. EXPORT EXCESS TOPSOIL AS REQUIRED.4.
ABANDON AND/OR REMOVE UTILITIES AS REQUIRED.3.
FOR FIELD CONDITIONS.
INSTALL EROSION CONTROL MEASURES AT THE LOCATIONS SHOWN ON THE PLANS OR AS REQUIRED2.
COORDINATE A MEETING WITH TOWN AND OWNER. RESPONSIBLE PARTIES TO BE IDENTIFIED.1.
CONSTRUCTION UNTIL DISTURBED AREAS ARE STABILIZED.
FEATURES, MINIMIZE SOIL DISTURBANCE, AND MAINTAIN E&S CONTROLS FOR THE DURATION OF
WITHIN THE DEVELOPMENT AREA. THE CONTRACTOR SHALL TAKE CARE TO PRESERVE SURROUNDING
THE TOPOGRAPHY CONSISTS OF GENTLY SLOPING TERRAIN, WITH SLOPES RANGING FROM 2% TO 5%2.
MEASURES SHALL BE EMPLOYED AS REQUIRED, SUCH AS COVERING STOCKPILES OR APPLYING WATER.
TO WIND-BLOWN EROSION. LONG-TERM EXPOSURE OF THESE SOILS SHALL BE AVOIDED. DUST-CONTROL
MODERATE SUSCEPTIBILITY TO SHEET AND RILL EROSION AND A MODERATE TO HIGH SUSCEPTIBILITY
MERRIMAC FINE SANDY LOAM TO THE EAST. USDA IDENTIFIES THE SOILS AS HAVING A LOW TO
PER USDA NRCS SOIL MAPPING, THE SITE CONSISTS OF HINCKLEY LOAMY SAND TO THE WEST AND1.
CONCERNS & ISSUES SHALL BE NOTED:
DEPICTED ON THIS SHEET SHALL BE FOLLOWED. IN ADDITION THE FOLLOWING SITE SPECIFIC E&S CONTROL
THE EROSION & SEDIMENTATION CONTROL NOTES, INSPECTION REQUIREMENTS, PLANS, AND DETAILS
ARE COMPLETED.
STABILIZATION OF THE SITE WILL OCCUR IN SEQUENCE AS THE BUILDING AND SURROUNDING IMPROVEMENTS
SEDIMENTATION. PHASING OF MASS EARTH WORK IS NOT REASONABLE DUE TO THE LIMITED SIZE OF THE SITE.
MINIMIZES THE AREA, LIMIT AND TIME SOILS ARE EXPOSED TO RAIN AND WIND AND SUBJECT TO EROSION &
PART OF THE WORK, INCLUDING CONNECTION TO THE EXISTING PAVED DRIVEWAY TO THE WEST. THE PLAN
THE EXISTING PARCEL IS APPROXIMATELY 1.08 ACRE. APPROXIMATELY 1.1 ACRES WILL BE DISTURBED AS
IMPROVEMENTS. THE GENERAL SCOPE OF WORK IS DESCRIBED ABOVE IN THE CONSTRUCTION SEQUENCE.
THE PROPOSED PROJECT CONSISTS OF THE CONSTRUCTION OF A CAR WASH FACILITY AND ASSOCIATED SITE
AND SWALES SHALL BE MAINTAINED TO CONTROL RUNOFF AND PREVENT SEDIMENT DISCHARGE.
PUBLIC ROW AND INFILTRATION SHALL BE MAINTAINED. AT ALL TIMES DURING CONSTRUCTION, THE TST'S
DIRECTED TO THE TST'S. CONSTRUCTION WASTEWATERS SHALL NOT DISCHARGE DIRECTLY TO THE
DURING SITE CONSTRUCTION. ALL DEWATERING DISCHARGE AND CONSTRUCTION RUNOFF SHALL BE
TEMPORARY SILTATION TRAPS (TST) AND DIVERSION SWALES SHALL BE INSTALLED AS NECESSARY7.
DUST CONTROL MEASURES SHALL BE APPLIED THROUGHOUT THE CONSTRUCTION PERIOD. 6.
AN EROSION CONTROL SYSTEM SHALL BE INSTALLED AROUND ALL STOCKPILES OF SOIL.5.
BASINS ON SITE SHALL BE SURROUNDED WITH STRAW WADDLES OR BALES.
SACKS AS SHOWN ON THE PLAN THROUGHOUT THE CONSTRUCTION PERIOD. IF REQUIRED, NEW CATCH
ALL CATCH BASINS WITHIN THE PROJECT AREA SHALL BE PROTECTED WITH INLET CONTROL FILTER SILT4.
TRAFFIC. THE SURROUNDING ROAD SURFACES SHALL BE SWEPT DAILY OR AS REQUIRED.
TO PREVENT THE TRANSPORT OF SEDIMENTS OFF THE CONSTRUCTION SITE BY TRUCKS AND EQUIPMENT
AN ANTI-TRACKING APRON WILL BE INSTALLED AT ALL ENTRANCES TO THE CONSTRUCTION SITE IN ORDER3.
CONSTRUCTION WHEREVER POSSIBLE.
ALL EROSION AND CONTROL MEASURES SHALL BE INSTALLED AT THE PROJECT SITE PRIOR TO2.
EMERGENCY CONTACT: TO BE PROVIDED PRIOR TO ISSUANCE OF BUILDING PERMIT
PARTY RESPONSIBLE FOR E&S CONTROL PLAN: DIAMOND SPARKLE CAR WASH, LLC1.
100 LBS. PER ACRE.
TEMPORARY GRASS SEEDING, IF NECESSARY, SHALL BE PERENNIAL RYE GRASS APPLIED AT A RATE OF11.
ACRE OR AS RECOMMENDED BY THE SEED MANUFACTURER.
GRASS SEED MIXTURES SHALL BE TALL FESCUE BLEND APPLIED AT A RATE NO LESS THAN 100LBS PER10.
SPRING: APRIL 15 TO JUNE 15, FALL: AUGUST 15 TO SEPTEMBER 15
THE FOLLOWING DATES FOR SEEDING SHALL BE USED:9.
AREAS OUTSIDE OF IMPERVIOUS AREAS TO RECEIVE A MINIMUM 4" OF TOPSOIL.8.
IN CTDOT FORM 819 OR AS DIRECTED BY THE LANDSCAPE ARCHITECT.
ALL DISTURBED AREAS ARE TO BE RAKED, SEEDED AND FERTILIZED PER "TURF ESTABLISHMENT" SPEC.7.
THESE PLANS OR AS DIRECTED BY THE ENGINEER OR TOWN.
THE CONTRACTOR WILL BE RESPONSIBLE FOR IMPLEMENTING ALL E&S CONTROL DEVICES AS SHOWN ON6.
IS CONSISTENT WITH THE INTENT OF THE PLAN.
SEDIMENT REMOVED FROM ANY CONTROL STRUCTURES SHALL BE DISPOSED OF IN A MANNER WHICH5.
DURING THE CONSTRUCTION PERIOD AS NECESSARY OR REQUIRED BY THE ENGINEER OR THE TOWN.
EROSION CONTROL DEVICES SHALL BE MAINTAINED, REPLACED AND/OR ADDED BY THE CONTRACTOR4.
DATED 2023, AS AMENDED AND THE TOWN OF SIMSBURY REGULATIONS.
SPECIFICATIONS OF THE "CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL",
ALL E&S CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE STANDARDS AND3.
E&S CONTROL MEASURES SHALL BE INSTALLED PER THE PLANS, OR AS DIRECTED BY THE TOWN.2.
CONSTRUCTION IS ANTICIPATED TO START IN FALL 2026 AND BE COMPLETED IN 2027.1.
ALL STORMWATER STRUCTURES SHALL BE CLEANED AFTER REMOVAL OF E&S CONTROLS.6.
THE HEIGHT (MAX.)2 1STRAW BALES - REMOVE COLLECTED SEDIMENT @ iv.
SILT SACKS - CLEAN PER MANUFACTURER'S RECOMMENDATIONSiii.
THE HEIGHT (MAX.)2 1SILT FENCE - REMOVE COLLECTED SEDIMENT @ ii.
ANTI-TRACKING APRON - REPLENISH OR REPLACE STONE SA REQUIREDi.
TEMPORARY CONTROLS SHALL BE INSPECTED WEEKLY AND CLEANED:B.
INSPECT ROAD DAILY AND SWEEP/REMOVE TRACKED MATERIALS AS REQUIREDA.
ROUTINE INSPECTION AND MAINTENANCE SCHEDULE:5.
CAPACITY2 1DEWATERING BASINS - REMOVE COLLECTED SEDIMENT @ C.
DEPTH4 1SWALES - REMOVE COLLECTED SEDIMENT @ B.
DEPTH OF SUMP2 1CATCH BASINS - REMOVE COLLECTED SEDIMENT @ A.
GREATER THAN 0.1 INCHES AND CLEANED AS FOLLOWS:
ALL STORMWATER STRUCTURES SHALL BE INSPECTED WITHIN 24 HOURS AFTER RAINFALL EVENTS4.
AFTER RAINFALL EVENTS GREATER THAN 0.1 INCHES
ALL E&S CONTROLS SHALL BE INSPECTED, REPAIRED, AND CLEANED IF NECESSARY WITHIN 24 HOURS3.
CLEANED TO ENSURE THEY ARE IN PROPER WORKING ORDER.
CONDITIONS OR EFFECTS, ALL E&S CONTROLS SHALL BE INSPECTED, MAINTAINED, REPAIRED AND/OR
PRIOR TO A MAJOR STORM IN WHICH THE NOAA ISSUES WARNINGS OF FLOODING, SEVERE WEATHER2.
THE RESPONSIBLE PARTY SHALL PERFORM ROUTINE INSPECTIONS BASED ON THE FOLLOWING.1.
THE SITE IS STABILIZED.
RESPONSIBLE PARTY SHALL IMPLEMENT THE FOLLOWING THROUGHOUT THE CONSTRUCTION PERIOD UNTIL
REGULAR INSPECTION AND MAINTENANCE IS CRITICAL FOR THE EFFECTIVENESS OF E&S CONTROLS. THE
SWEPT AS REQUIRED
ROADWAY TO BE
APRON
ANTI-TRACKING
WET VOLUME = 67 CY
DRY VOLUME = 67 CY
TST #1
STOCKPILE
TOPSOIL
AROUND ALL BASINS (TYP.)
DEVICE TO BE INSTALLED
INLET SEDIMENT CONTROL
BOUNDARIES OR AS SHOWN (TYP.)
NORTH, EAST & SOUTH PROPERTY
SILT FENCE TO BE INSTALLED ALONG
DIVERSION SWALE TO WEST
WALL OF EX. CATCH BASIN
DISCHARGE INTO ORIFICE IN NORTH
STONE & RIPRAP WEIR FROM TST TOPage 33
S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
WG
S
S
GG
S
?
2622
CL&P
2623
CL&P
2623S
CL&P
ELEV.=198.71
E 989669.19
N 891545.09
P.K. NAIL
CP#19068
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
E
E
C
C
T
FLAG POLE
ELEV.=204.26
E 989309.93
N 891321.88
REBAR
CP#173
D
CONC. WALK
SET
MON.'S
SET
MON.
SET
MON.
SET
MON.
SET
MON.
SET
MON.
connection (typ.)
access/roadway
Possible future
connection (typ.)
access/roadway
Possible future
Mixed Use Retail/Medical Office
Total 15,000 Square Feet 1 Story
BUILDING #2
13A
Signal
Traffic
NOTES:
LIGHT POLE & BASE
SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE: 1" = 20'
PROJECT NUMBER:
00222 - 001
20 0 20 40 60
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION
SHEET
DATE
REVISED
5/15/26
6/26/26
OF 6 6
REVISION SUMMARY
DORSET CROSSING PAD
MASTER DEVELOPMENT PLAN
PREPARED FOR
DIAMOND SPARKLE CAR WASH LLC, APPLICANT
LIGHTING PLAN
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)
LP
L
P
L
P
LP
LP
L
P
L
P
LP
LP
LP
LP
LP
DORSET CROSSING DRIVE
H
O
P
M
E
A
D
O
W
S
T
R
E
E
T
(C
T
R
O
U
T
E
10 &
202)
NOT TO SCALE
1. CLASS "F" CONCRETE CTDOT 816
2. REINFORCEMENT NOT SHOWN FOR
CLARITY. GRADE 60.
3. ANCHOR BOLTS HOT DIPPED GALVANIZED.
DIAMETER, PROJECTION EMBEDMENT,
LOCATION PER LIGHT POLE MANUAL.
4. EXTERIOR LAMP, BASE & POST SHALL BE
COORDINATED WITH TOWN, OWNER, &
ELECTRICAL CONTRACTOR
CONDUIT
2" DIA. PVC
GRADE
FINISH
1" CHAMFER
(TYP. OF 2)
2" DIA. PVC SWEEP
GROUND ROD
1" DIA. PVC FOR
(SEE NOTE 3)
ANCHOR BOLT
MANUFACTURER
PER LIGHT POLE
BOLT PATTERN AS
24" DIA.
24" Ø
6"42"
DISTRIBUTION AS SPECIFIED
LIGHT FIXTURE OR EQUAL
LUMARK 'PRV-C15-D-UNV'
COOPER LIGHTING SOLUTIONS
15' M
O
U
N
T
IN
G
H
E
IG
H
T
A
B
O
V
E
B
A
S
E
LIGHTING STATEMENT
LIGHTING NOTES
LUMINAIRE SCHEDULE
ARRANGEMENTDESCRIPTIONLABELQUANTITYSYMBOL
DOUBLEPRV-C15-730-D-UNV-T4-SA-BKT4A0
SINGLEPRV-C15-730-D-UNV-T4-SA-BK-HSST4HSS12
SINGLEPRV-C15-730-D-UNV-T4-SA-BKT40
T4HSS
T4HSS
T4HSS
T4HSS
T4HSS
T4HSS
T4HSS
0.1 fc
0.1 fc
0.1 fc
0.1 fc
0.1 fc
0.1 fc
0.2 fc
0.2 fc
0.2 fc
0.2 fc
0.2 fc
0.5 fc
0.5 fc
0.5 fc
0.5 fc
0.5 fc
1.0 fc
1.0 fc
1.0 fc
1.0 fc
1.0 fc
2.0 fc
2.0 fc
2.0 fc
2.0 fc
E
X
IS
T
IN
G
D
R
IV
E
W
A
Y
AREA = 7,275 SF±
CAR WASH
1 STORY
BUILDING #1
CANOPY
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
ISOLINE CONTOUR (TYP.)
ISOLINE VALUE (TYP.)
T4HSS
T4HSS
T4HSS
T4HSS
T4HSS
0.2 fc
T4HSS
INTERNAL SITE LIGHTING AT COMMON LOT LINES IS IN HARMONY WITH THE APPROVED PAD DEVELOPMENT.
A MAXIMUM ILLUMINATION VALUE OF 0.5 FC HAS BEEN MET AT THE DORSET CROSSING ROW (SOUTH).2.
PROPERTY LINES HAVE NOT BEEN CONSIDERED IN THE ANALYSIS.
BUILDING MOUNTED LIGHTING OR EXISTING POLE MOUNTED FIXTURES ALONG THE NORTH, WEST, AND SOUTH
OF 0.5 TO 2.0 FC FOR DRIVES, PARKING AREAS AND PEDESTRIAN WALKS SERVING THE BUILDING ENTRANCES.
SOCIETY. MINIMUM HORIZONTAL ILLUMINATION LEVELS OF 0.2 FC ARE PROPOSED WITH A TYPICAL RANGE
DEVELOPMENT AND GENERALLY MEETS THE RECOMMENDATIONS OF THE ILLUMINATING ENGINEERING
EXTERIOR LIGHTING HAS BEEN DESIGNED FOR A SUBURBAN COMMERCIAL USE WITHIN AN APPROVED PAD1.
PHOTOMETRIC PLAN.
CANOPY LIGHTS WILL BE DARKSKY APPROVED OR MOUNTED IN THE CEILING. NOT INCLUDED IN
SEE ARCHITECTURAL PLANS FOR BUILDING AND CANOPY MOUNTED LIGHTING. ALL BUILDING AND4.
LEVELS SET TO 25% OF DESIGN VALUES.
LIGHTING WITHIN 15 MINUTES OF NO ACTIVITY SHALL HAVE REDUCED POWER OUTPUT AND ILLUMINATION
SECURITY AND SAFE VEHICULAR CIRCULATION THROUGH THE SITE FOR USE OF THE SELF-SERVE BAYS.
TIMERS, PHOTOCELLS, OR MOTION SENSORS TO REDUCE LIGHTING TO THE MINIMUM NECESSARY FOR
ARE CLOSED, ALL NON-ESSENTIAL LIGHTING FIXTURES SHALL BE CONTROLLED MANUALLY OR WITH
THE SELF-SERVE BAYS ARE OPEN 24 HOURS. WHEN THE AUTOMATIC TUNNEL AND TOUCHLESS BAYS3.
POLE-MOUNTED = 15' FIXTURE HEIGHTA.
FIXTURE MOUNTING HEIGHTS:2.
THAN 10° OF TILT.
PREVAIL LED IS DARKSKY APPROVED FOR 3000K CCT AND WARMER, WITH MOUNTING OPTIONS LESS
OF LIGHT AND GLARE ON ADJACENT PROPERTIES AND ROADWAYS. THE SELECTED FIXTURE LUMARK
ALL SITE LIGHTING SHALL BE FULL CUT-OFF OF SHIELDED TYPE TO PREVENT UPWARD DISTRIBUTION1.Page 34
Page 35
Page 36
Site Plant Schedule; 100% Native By Variety: 100% Native By Amount: Key Quantity Botanical Name Common Name Size Installed Comments Street / Shade / Ornamental Trees: Aag # 1 Acer rubrum ‘Armstrong Gold’ Armstrong Gold Maple 2” – 2-1/2" Cal., 10’ O.C. B & B (N) Arr # 2 Acer rubrum ‘Redpointe’ Redpointe Maple 2” – 2-1/2" Cal., 30’ O.C. B & B (N) Axa # 1 Acer x freemani ‘Armstrong’ Armstrong Freeman Maple 2” – 2-1/2" Cal., 15’ O.C. B & B (N) Alu # 2 Amelanchier laevis ‘Lustre’ Lustre Alleg. Serviceberry 2” – 2-1/2" Cal., 15’ O.C. B & B (N) Coc # 2 Celtis occidentalis Hackberry 2” – 2-1/2" Cal., 40’ O.C. B & B (N) Cbh # 1 Cercis canadensis ‘Burgundy Hearts’ Burgundy Hearts Eastern Redbud 2” – 2-1/2" Cal., 25’ O.C. B & B (N) Lss # 2 Liquidamber sty.‘Slender Silhouette’ Slender Silhouette Sweetgum 2” – 2-1/2" Cal., 6’ O.C. B & B (N) Lha # 1 Liquidamber styraciflua ‘Hapdell’ Hapdell Sweetgum 2” – 2-1/2" Cal., 30’ O.C. B & B (N) Nwf # 1 Nyssa sylvatica ‘Wildfire’ Wildfire Black Tupelo 2” – 2-1/2" Cal., 25’ O.C. B & B (N) Qpb # 2 Quercus pal. ‘Pacific Brilliance’ Pacific Brilliance Pin Oak 2” – 2-1/2" Cal., 25’ O.C. B & B (N) Qco # 2 Quercus coccinea Scarlet Oak 2” – 2-1/2" Cal., 45’ O.C. B & B (N) Uap # 1 Ulmus americana ‘Princeton’ American Elm 2” – 2-1/2” Cal., 40’ O.C. B & B (N) Evergreen Trees: Ish # 1 Ilex opaca ‘Satyr Hill’ Satyr Hill Holly 6’ – 7’ Ht., 13’ O.C. B & B (N-E) Shrubs / Ornamental Grasses: Ape # 8 Azalea periclymenoides Pinxterbloom Azalea 3 Gal., 4.5' O.C. Container (N) Bba # 19 Bouteloua gra. ‘Blonde Ambition’ Blonde Ambition Gramma 1 Gal., 2.75’ O.C. Container (N) Cla # 9 Chasmanthium latifolium Northern Sea Oats 1 Gal., 2’ O.C. Container (N) Cse # 2 Cornus sericea ‘Arctic Fire’ Arctic Fire Dogwood 3 Gal, 4' O.C. Container (N) Gba # 13 Gaylussacia baccata Black Huckleberry 2 Gal., 2.5’’ O.C. Container (N) Igd # 4 Ilex glabra ‘Densa’ Dense Inkberry Holly 3 Gal., 6’ O.C. Container (N-E) Jgc # 5 Juniperus communis ‘Gold Cone’ Gold Cone Juniper 3 Gal., 2.75' O.C Container (N-E) Jhg # 5 Juniperus horizon. ‘Golden Carpet‘ Golden Carpet Juniper 2 Gal., 3.5' O.C. Container (N-E) Jyt # 4 Juniperus hor. ‘P.C. Youngstown’ Youngstown Juniper 2 Gal., 5' O.C. Container (N-E) Kau # 15 Kalmia augustfolia Sheep Laurel 2 Gal., 4' O.C. Container (N-E) Knh # 4 Kalmia latifolia ‘Nathan Hale’ Nathan Hale Mountain Laurel 5 Gal.., 7' O.C. Container (N-E) Knm # 6 Kalmia latifolia ‘Nipmuck’ Nipmuck Mountain Laurel 3 Gal.., 4' O.C. Container (N-E) Klk # 7 Kalmia latifolia ‘Keepsake’ Keepsake Mt. Laurel 3 Gal.., 5' O.C. Container (N-E) Las # 14 Leucothoe axillaris ‘Squirt’ Squirt Coast Leucothoe 2 Gal., 2.5' O.C. Container (N-E) Lfr # 9 Leucothoe fontanesiana ‘Rainbow’ Rainbow Leucothoe 3 Gal., 4' O.C. Container (N-E) Mca # 12 Muhlenbergia capillaris Muhly Grass 1 Gal., 3’ O.C. Container (N-E)
Page 37
Marc S. Nelson, MPA George K. McGregor, AICP Town Manager Director PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT 933 Hopmeadow St. Tel. (860) 658-3245 Simsbury, CT 06070 gmcgregor@simsbury-ct.gov STAFF REPORT MEMORANDUM To: Simsbury Zoning Commission From: George K. McGregor, AICP Date: July 20, 2026 Subject: ZC 26-18, Dorset Crossing Zone Change/Master Plan ZC 26-19, 10 Dorset Crossing Site Car Wash Site Plan ZC #26-18, An application of Dorset Crossing LLC, Owner, Dwight Merriam, Agent, pursuant to Section 8 of the Zoning Regulations for a zone change and amendment to the Master Development Plan to allow a car wash facility at 10 Dorset Crossing (Assessor’s Map Block Lot I04 403 13C-F), Planned Area Development (PAD) Zone. ZC 26-19, An application of Dorset Crossing LLC, Owner, Dwight Merriam, Esq. Applicant, for a site plan approval to develop a 7,275 sq. ft. car wash facility at 10 Dorset Crossing (Assessor’s Map Block Lot I04 403 13C-F), Planned Area Development (PAD) Zone.
Page 38
2 This staff report is a joint staff report for the zone change/master plan amendment and site plan. Master Plan Amendment/Zone Change Dorset Crossing is a Planned Area Development (PAD), established in 2013 with a mix of commercial and residential uses. The project was amended in 2022 and 2023 and currently allows 27,000 sq.ft. of commercial and 360 multi-family residential homes. The development is partially constructed: Use Type LOT Density Constructed Mixed Use Retail/Medical Office A 15,000 sf Yes Residential Multi-Family B 168 units Yes Special Needs Multi-Family C 48 units Yes Residential Multi-Family D 30 units NO Mixed Use/Retail F 12,000 sf NO Residential Multi-Family G 42 units NO Residential Multi-Family H 72 units NO The Applicant proposes to amend the area described as “Lot F” by replacing two proposed buildings (12,000 sq.ft. of “retail/office”) with a 7,275 sq.ft. car wash facility. A “car wash” is defined separately in the zoning regulations and is not generally included along with other retail uses. Thus, the amendment to add the use constitutes a Master Development Plan change. Current conceptual plan alongside proposed: Having completed the first stage, a preliminary, non-binding review, the application is now a Master Plan/Zone Change application with a corresponding Site Plan. With
Page 39
3 this submission the Applicant requests formal review and action. The Application was accepted on July 6, 2026, and will be forwarded for referral to the Planning Commission (July 14, 2026) and the Design Review Board (July 20, 2026). The application is scheduled for a public hearing at the Zoning Commission on July 20, 2026. The master plan submission includes a site plan, traffic study, architectural elevations and other relevant materials. The property is zoned PAD and is in an Aquifer Protection District. A car wash is a permitted, unregulated activity in the aquifer district so long as “all waste waters from such activity are lawfully disposed of through a connection to a publicly owned treatment works.”1 Staff Review and Analysis-Master Plan Amendment Dorset Crossing is designated by the Plan of Conservation and Development (POCD) as a “Special Zone,” based on its mixed-use, Planned Area Development 1 Aquifer Protection Area Regulation p.6
Page 40
4 Zoning. PADs are mixed use developments holding both residential and nonresidential components. The master plan for the Dorset Crossing development identifies this subject parcel for “retail/office” uses. An amendment allowing a car wash facility to be developed in lieu of retail or office is generally consistent and appropriate for the development. The car wash use is also consistent with the POCD which supports mixed-use development in this location. Site Plan Review The Applicant proposes to develop a 7,275 sq.ft. car wash facility at 10 Dorset Crossing. The project is subject to Section 8.1 (PAD regulations) and Section12 (Site Plan Regulations) of the Zoning Regulations. Accompanying and in support of the application the Applicant has submitted: Site Plan (w/ drainage, stormwater, utilities, lighting, etc....) Architectural Elevations Traffic Study Landscaping Plan Narrative and ongoing responses to identified issues.
Page 41
5 The car wash proposed is a multi-faceted facility. Elements on site include an automated drive through car wash, separate self-service car wash bays, detailing options, and vacuum stations. Access to the site will be via an internal unnamed Dorset Crossing street; no direct access is planned to Dorset Crossing Drive or Hopmeadow St. The facility plans 24-hour operations, with the self-service bays open after the attended car wash tunnel closes. The Planning Commission questioned the necessity of being open 24 hours and the lighting impacts of such hours. The Applicant proposes to review these impacts after one year in operation2. The Applicant has submitted a traffic study detailing the impacts of the amendment and site plan on traffic generation and turning movements. The proposed scenario represents an overall reduction in trip generation from both the original approval and recent revisions due to the reduction in commercial and increase in residential units. Nonetheless, a car wash does present some challenges as the peaks traffic activity can vary from other commercial uses and on-site queuing must be considered (the queue as shown is +-18 cars). We note the Level of Service (LOS) C under certain turning movements. Staff asks the applicant to confirm whether the Level of Service C exists today or is decreased from B due to this application. The Application contains a comprehensive landscaping plan with the focus on supplementing screening along Hopmeadow St. Additionally, street trees and on- site foundation plantings are offered. Native species are intended at 100%. Referral, Staff Review, and Analysis Specific review comments from individual referral agencies are attached to this report: Planning Commission-The Planning Commission will review the Application on July 14, 2026. During previous informal sessions the Commission requested information related to traffic impacts, hours of operation, water service availability, and drought implications over water usage Design Review Board-The DRB will review this application for a formal recommendation on July 20, 2026. During previous informal sessions, the DRB was broadly supportive of the architectural design and site plan. 2 See Applicant “Car Wash Action List” #4, attached to Staff Memorandum
Page 42
6 Fire Marshal-The Fire Marshal has requested a widening of internal drive aisles, along with other options, for fire safety and access reasons. The Applicant is considering site revisions to meet this requested standard. Planning Staff-Planning Staff has requested additional information related to waster service capacity from Aquarion; engineering wastewater reporting; industry- related standards for water recycling; lighting standards; wall sign information; hours of operation; and standard sheet information for site plan applications. Staff and the Applicant are working to address these issues. Town Engineer-The Town Engineer concurs with Planning that a wastewater engineering report, as required by the zoning regulations, be submitted. The Town Engineer, in a memo dated July 14, 2026, requested minor clarifications. No additional outstanding issues have been identified. Town Police Department-No outstanding issues identified. Staff and the Applicant are working to gather additional information requested and resolve outstanding issues. Staff and the Applicant agree on a recommendation to continue site plan review at the commission’s September 9, 2026, regular meeting.
Page 43
7 Draft Motions Zone Change/Master Plan Amendment MOVED, The Zoning Commission APPROVES Application ZC 26-18 of Dorset Crossing LLC, owner, Dwight Merriam Esq., applicant, for formal Application Review to amend the Master Development Plan at Dorset Crossing to include a Car Wash Facility at 10 Dorset Crossing, based on a finding that: The master plan for the Dorset Crossing development identifies this subject parcel for “retail/office” uses. An amendment allowing a car wash facility to be developed in lieu of retail or office is generally consistent and appropriate for the development. The car wash use is also consistent with the POCD which supports mixed-use development in this location. The Approval is subject to the following conditions: 1. Zone Change/Master Plan Amendment shall be developed in substantial conformance to the Dorset Crossing PAD Master Development Plan dated April 30, 2026, REVISED June 26, 2026 The Zone Change/Master Plan is effectively immediately, subject to the standard appeal period. OR Alternate Motion Site Plan MOVED, the Zoning Commission FORWARDS ZC 26-19, An application of Dorset Crossing LLC, Owner, Dwight Merriam, Agent, for a site plan approval to develop a 7,275 sq. ft. car wash facility at 10 Dorset Crossing to the regular meeting on September 9, 2026. OR Alternate Motion
Page 44
Marc S. Nelson, MPA Thomas J. Roy, P.E. Town Manager Director of Public Works Town Engineer DEPARTMENT OF PUBLIC WORKS – ENGINEERING DIVISION https://ct-simsbury.civicplus.com Mon. (8:30am-7:00pm) Tel. (860) 658-3260 933 Hopmeadow Street Tue. Wed. Thu. (8:30am-4:30pm) Fax. (860) 658-3205 Simsbury, CT 06070 Fri. (8:30am-1:00pm) akessler@simsbury-ct.gov MEMORANDUM To: George K. McGregor, AICP, Dir. of Community Planning and Development From: Adam D. Kessler, P.E., Deputy Town Engineer cc: Date: July 14, 2026 Subject: Engineering Comments - #10 Dorset Crossing Proposed Diamond Sparkle Car Wash, LLC ZC 26-18 & ZC 26-19 The Engineering Department has reviewed the documents submitted as part of the Site Modification Application for the development of #10 Dorset Crossing as a Diamond Sparkle Car Wash. Documents were received by this department on June 30, 2026: 1. Site plan set entitled “Dorset Crossing Pad Master Development Plan, Site Modification – Lot F”, prepared for Dorset Crossing LLC, prepared by YRC, dated March 20, 2025, revised through June 26, 2026. 2. Stormwater report entitled “Master Plan Development, Stormwater Management Report, Site Modification – Lot F, Proposed Diamond Sparkle Car Wash”, prepared for Diamond Sparkle Car Wash, LLC prepared by YRC, dated June 29, 2026. Applicant shall respond to all comments in writing and note any and all revisions made to the design plans and supporting reports. In consideration of the documents submitted as of the date of this review memorandum, we offer the following: 1. Please copy this office with all permit applications submitted to state agencies related to this project. 2. Please provide final construction plans for the record and reference during construction. 3. Provide a turning movement study to demonstrate acceptable site access for fire apparatus. 4. Provide details related to the proposed improvement including but not limited to pavement sections, drainage and utilities. 5. Provide an inspection report of the existing drainage infrastructure that will receive runoff from this development. Pre‐construction inspection will provide a baseline condition of the existing
Page 45
Engineering Comments May 5, 2026 Page 2 of 2 system to ensure all parties, including the Town, are aware of the condition. It is recommended to remove any accumulated sediment or debris from existing structures downstream of the improvements before construction and following construction. 6. Please review Table 3 of the Traffic Impact Statement for accuracy. The SB Thru Queue during the Saturday Peak Hour is “#572”. Is this an error? Or does the “#” symbol refer to a note elsewhere in the report? 7. While the level of service at the Dorsett Crossing intersection with Hopmeadow Street remains acceptable, the level of service degrades with each new development. Please note that additional development in the future may require further study of traffic impacts and mitigations to maintain LOS C or better. 8. Facility connection charge and permit from the Simsbury WPCA are required to connect to the existing sanitary sewer lateral.
Page 46
Archived: Tuesday, July 14, 2026 8:04:36 AM From: Patrick T. Tourville, CFI I Sent: Thu, 2 Jul 2026 11:20:12 To: McGregor George Subject: Re: ZC 26-18 10 Dorset Crossing Master development plan Importance: Normal Sensitivity: None External sender <ptourville@simsburyfd.org> Make sure you trust this sender before taking any actions. Fire Department access roads need to be 20 feet wide. The roads around perimeter are only 13 feet, and the entry shows 18 feet per lane. If the main entry exit is not blocked with any islands or barriers this would be ok. Patrick Tourville CFI-I Fire Marshal Chief of Fire Prevention Simsbury Fire District 871 Hopmeadow Street Simsbury, CT 06070 Office 860.658.1973 Cell 860.818.0479 From: McGregor George <gmcgregor@simsbury-ct.gov> Sent: Wednesday, July 1, 2026 10:21 AM To: Patrick T. Tourville, CFI I <PTourville@simsburyfd.org>; nboulter <nboulter@pd.simsbury-ct.gov>; Davis Chris <cdavis@pd.simsbury-ct.gov> Subject: ZC 26-18 10 Dorset Crossing Master development plan Attached are relevant info for the FINAL Master Plan Site Plan for the Car Wash. If you have comments please provide by Friday July 10. I am waiting on a electronic traffic study and will forward when I get. George George K. McGregor, AICP Planning & Community Development Director Town of Simsbury 933 Hopmeadow Street Simsbury, CT 06070 P(860) 658 3252 gmcgregor@simsbury-ct.gov
Page 47
The Planning and Community Development Department has been made aware of fraudulent emails containing false invoices for land use applications. If you receive a suspicious email, we urge you to contact us at 860-658-3252.
Page 48
Archived: Tuesday, July 14, 2026 8:04:47 AM
From: Davis Chris
Sent: Mon, 13 Jul 2026 15:57:11
To: McGregor George Boulter Nicholas (SPD)
Subject: RE: car was site plan and traffic study
Importance: Normal
Sensitivity: None
Warning: Unusual sender <cdavis@pd.simsbury-ct.gov>
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.
I don’t have any concerns with it.
Thank you!
____________________
Christopher A. Davis
Deputy Chief of Police
Simsbury Police Department
(860) 658-3104
From: McGregor George <gmcgregor@simsbury-ct.gov>
Sent: Monday, July 13, 2026 11:17 AM
To: Boulter, Nicholas <NBoulter@pd.simsbury-ct.gov>; Davis Chris <CDavis@pd.simsbury-ct.gov>
Subject: car was site plan and traffic study
Y o u g u y s h a v e a n y c o m m e n t s o n t h is a p p lic a t io n ? I s e n t in f o t w o w e e k s b a c k o r s o G e o r g e K . M c G r e g o r , A I C P P la n n in g & C o m m u n it y D e v e lo p m e n t D ir e c t o r T o w n o f S im s b u r y 9 3 3 H o p m e a d o w S t r e e t S im s b u r y , C T 0 6 0 7 0 P ( 8 6 0 ) 6 5 8 3 2 5 2 g m c g r e g o r @ s im s b u r y - c t . g o v
External sender <gmcgregor@simsbury-ct.gov>
Make sure you trust this sender before taking any actions.
You guys have any comments on this application? I sent info two weeks back or so
George K. McGregor, AICP
Planning & Community Development Director
Town of Simsbury
933 Hopmeadow Street
Simsbury, CT 06070
P(860) 658 3252
gmcgregor@simsbury-ct.gov
Page 49
The Planning and Community Development Department has been made aware of fraudulent emails containing false invoices for land use applications. If you receive a suspicious email, we urge you to contact us at 860-658-3252.
Page 50
Car Wash Action List 2026-07-09 1. The zoning use list definition asks for a “report from a professional engineer on the disposal and impact of wastewater and cleaning products…” I find no such report in the submission. Client has engaged an expert consultant. 2. The plan set labeled “PAD” Submission contains sheets generally used for a site plan submission. Is the plan to use this PAD submission for the site plan as well? I have asked Town Engineering for their input on this. It shall meet Section 11. Yes, we have assumed that the master plan amendment typically includes the site plan, but it may be better for the town and the applicant if there is a separate site plan application later after receipt of additional information requested from others.. Addressing Section 11 requirements may have to come later. 3. There is a document labeled “PAD Master Plan Submission; Development Narrative” which starts with a “9. “ Entry related to landscaping. This item appears isolated and is perhaps part of a larger document? It is unclear. Resolved. 4. Hours of operation. As discussed during preliminary review and raised by the Planning Commission, please confirm intended hours of operation for all services on site. Also, please address site lighting impacts as it relates to hours of operation. If the self-service car wash operation is to be open after the attended car wash tunnel is closed, some lighting will remain on. The reduction in lighting is indicated on the site plans.
Page 51
As to hours of operation, many people are on shift work, particularly in health services where they are 24/7 and employees go in and out day and night. The experience in Colchester is that 15% of customers use the facility between 11 PM and 5 AM. The proposal is to be open 24/7 with a condition requiring the developer to return one year after commencing operations for a review of the lighting and the operation. The developer will pay the cost of an independent lighting consultant and planner or traffic engineer to review the lighting and the impact of the operation. If 24/7 operations are unsatisfactory to the Zoning Commission in its sole discretion, the approval would be amended to limit the hours of operation to 5 AM to 11 PM with the site fully shut down from 11:00 PM to 5:00 AM. With that year of experience, the developer can adjust the lighting to provide safe access while minimizing the light and have the operating experience to assess the extent to which the public need is being met with no adverse impacts. 5. As raised during the PC review, please address water usage and service availability from Aquarion High usage is a concern of commissioners. A request was made to Aquarion to confirm the availability to service the proposed use. They have not responded. They have said they will be providing a 1.5-inch service from the 4-inch line.
Page 52
6. Please provide a broader description and narrative related to proposed water recycling efforts as they relate to industry standards and best practices. The stated commitment to 30-40 percent seems low. An expert consultant has been engaged to provide the requested information. The developer is awaiting information from the equipment provider. 7. Traffic Study includes the Hotel. It is not part of the Dorset Crossing PAD, but I guess can be helpful vis a vis comparison for trip generation under different scenarios. The traffic engineer agrees it is useful information. 8. Please specify the color temperature of the pole lights proposed and adjust the shielding of the fixtures at the northern property line. They are limited to 3,000 Kelvin and cannot measure more than 0.5 FC at the property line under the outdoor lighting regulations. See Lighting Statement 2 and Note 1. The specified lights are 3000K. As for the 0.5 fc at the property line, a question is raised as to its applicability in a PAD with common lot lines where the abutter and driveway lights are physically on our property and illuminating other properties. 9. Please confirm no signs are proposed currently. If wall signs or freestanding signs are intended, please provide appropriate plans and specifications. Wall signs are as shown on the site plan and architectural renderings. Details on materials and lighting are forthcoming. There is a freestanding sign facing Dorset Crossing Drive; details forthcoming. Added items: 1. Fire marshal’s drive lane widths. Redesign in process.
Page 53
Page 54
Page 55
Site Plant Schedule; 100% Native By Variety: 100% Native By Amount: Key Quantity Botanical Name Common Name Size Installed Comments Street / Shade / Ornamental Trees: Aag # 1 Acer rubrum ‘Armstrong Gold’ Armstrong Gold Maple 2” – 2-1/2" Cal., 10’ O.C. B & B (N) Arr # 2 Acer rubrum ‘Redpointe’ Redpointe Maple 2” – 2-1/2" Cal., 30’ O.C. B & B (N) Axa # 1 Acer x freemani ‘Armstrong’ Armstrong Freeman Maple 2” – 2-1/2" Cal., 15’ O.C. B & B (N) Alu # 2 Amelanchier laevis ‘Lustre’ Lustre Alleg. Serviceberry 2” – 2-1/2" Cal., 15’ O.C. B & B (N) Coc # 2 Celtis occidentalis Hackberry 2” – 2-1/2" Cal., 40’ O.C. B & B (N) Cbh # 1 Cercis canadensis ‘Burgundy Hearts’ Burgundy Hearts Eastern Redbud 2” – 2-1/2" Cal., 25’ O.C. B & B (N) Lss # 2 Liquidamber sty.‘Slender Silhouette’ Slender Silhouette Sweetgum 2” – 2-1/2" Cal., 6’ O.C. B & B (N) Lha # 1 Liquidamber styraciflua ‘Hapdell’ Hapdell Sweetgum 2” – 2-1/2" Cal., 30’ O.C. B & B (N) Nwf # 1 Nyssa sylvatica ‘Wildfire’ Wildfire Black Tupelo 2” – 2-1/2" Cal., 25’ O.C. B & B (N) Qpb # 2 Quercus pal. ‘Pacific Brilliance’ Pacific Brilliance Pin Oak 2” – 2-1/2" Cal., 25’ O.C. B & B (N) Qco # 2 Quercus coccinea Scarlet Oak 2” – 2-1/2" Cal., 45’ O.C. B & B (N) Uap # 1 Ulmus americana ‘Princeton’ American Elm 2” – 2-1/2” Cal., 40’ O.C. B & B (N) Evergreen Trees: Ish # 1 Ilex opaca ‘Satyr Hill’ Satyr Hill Holly 6’ – 7’ Ht., 13’ O.C. B & B (N-E) Shrubs / Ornamental Grasses: Ape # 8 Azalea periclymenoides Pinxterbloom Azalea 3 Gal., 4.5' O.C. Container (N) Bba # 19 Bouteloua gra. ‘Blonde Ambition’ Blonde Ambition Gramma 1 Gal., 2.75’ O.C. Container (N) Cla # 9 Chasmanthium latifolium Northern Sea Oats 1 Gal., 2’ O.C. Container (N) Cse # 2 Cornus sericea ‘Arctic Fire’ Arctic Fire Dogwood 3 Gal, 4' O.C. Container (N) Gba # 13 Gaylussacia baccata Black Huckleberry 2 Gal., 2.5’’ O.C. Container (N) Igd # 4 Ilex glabra ‘Densa’ Dense Inkberry Holly 3 Gal., 6’ O.C. Container (N-E) Jgc # 5 Juniperus communis ‘Gold Cone’ Gold Cone Juniper 3 Gal., 2.75' O.C Container (N-E) Jhg # 5 Juniperus horizon. ‘Golden Carpet‘ Golden Carpet Juniper 2 Gal., 3.5' O.C. Container (N-E) Jyt # 4 Juniperus hor. ‘P.C. Youngstown’ Youngstown Juniper 2 Gal., 5' O.C. Container (N-E) Kau # 15 Kalmia augustfolia Sheep Laurel 2 Gal., 4' O.C. Container (N-E) Knh # 4 Kalmia latifolia ‘Nathan Hale’ Nathan Hale Mountain Laurel 5 Gal.., 7' O.C. Container (N-E) Knm # 6 Kalmia latifolia ‘Nipmuck’ Nipmuck Mountain Laurel 3 Gal.., 4' O.C. Container (N-E) Klk # 7 Kalmia latifolia ‘Keepsake’ Keepsake Mt. Laurel 3 Gal.., 5' O.C. Container (N-E) Las # 14 Leucothoe axillaris ‘Squirt’ Squirt Coast Leucothoe 2 Gal., 2.5' O.C. Container (N-E) Lfr # 9 Leucothoe fontanesiana ‘Rainbow’ Rainbow Leucothoe 3 Gal., 4' O.C. Container (N-E) Mca # 12 Muhlenbergia capillaris Muhly Grass 1 Gal., 3’ O.C. Container (N-E)
Page 56
A3.01 A3.1 2 A3.0 2 A3.1 1 30' - 0"15' - 0"22' - 0"14' - 8"11' - 4" 6' - 0" 4' - 0" 45' - 0" 38' - 0" 24' - 0" 2' - 0" 6' - 0" 10' - 0" 26' - 0" 19' - 0" 70' - 0" 30' - 0"15' - 0"EQEQ14' - 8 1/2"25' - 4" 125' - 0" 107' - 0" 4' - 8" AUTOMATIC SOFT TOUCH AUTOMATIC TOUCHLESS OVERSIZE SELF- SERVICE SELF-SERVICE DETAILING BAYS EQUIPMENT ROOM OFFICE 22' - 2" 29' - 2" N 195 Scott Swamp Road Farmington, CT 06032 qamarch.com Issue Dates: Project #: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY E:\REVIT LOCAL\DSCW Mdl2_rpetitto.rvt6/29/2026 4:32:20 PM A1.1 FIRST FLOOR PLAN MUNICIPAL REVIEW 05.04.2026 QAM25090 DIAMOND SPARKLE CAR WASH PROJECT DESCRIPTION: SIMSBURY, CT Revisions
Page 57
8 1/2" / 1'-0" 8 1/2" / 1'-0" 1'-1" / 1'-0" 1'-1" / 1'-0" 8 1/2" / 1'-0"8 1/2" / 1'-0" 8 1/2" / 1'-0" 8 1/2" / 1'-0"8 1/2" / 1'-0" 8 1/2" / 1'-0" 8 1/2" / 1'-0" 1'-1" / 1'-0" 1'-1" / 1'-0" 1'-1" / 1'-0" 1'-0" / 1'-0"1'-0" / 1'-0" 1'-1" / 1'-0" 9" / 1'-0" 9" / 1'-0" ARCHITECTURAL ASPHALT SHINGLES ALUMINUM GUTTER TYP ALUMINUM GUTTER TYP ALUMINUM GUTTER TYPALUMINUM GUTTER TYP ALUMINUM GUTTER TYP ARCHITECTURAL ASPHALT SHINGLES ARCHITECTURAL ASPHALT SHINGLES STANDING SEAM METAL ROOFING N 195 Scott Swamp Road Farmington, CT 06032 qamarch.com Issue Dates: Project #: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY E:\REVIT LOCAL\DSCW Mdl2_rpetitto.rvt6/29/2026 4:32:23 PM A1.4 ROOF PLAN MUNICIPAL REVIEW 05.04.2026 QAM25090 DIAMOND SPARKLE CAR WASH PROJECT DESCRIPTION: SIMSBURY, CT Revisions 1/8" = 1'-0"A1.4 1 ROOF PLAN
Page 58
ARCHITECTURAL ASPHALT SHINGLES ALUMINUM GUTTER TYP STANDING SEAM METAL ROOFING WHITE PVC TRIM TYP WHITE PVC TRIM TYP SPLIT FACED CMU TYP BOARD AND BATTEN VINYL SIDING AT GABLE INSETS TYP HARDIE CLAPBOARD SIDING BOARD AND BATTEN VINYL SIDING AT GABLE INSETS TYP ALL SIGNAGE SHOWN AT 1'6" HIGH TO MIDPOINT 26' - 7" FROM GRADE ARCHITECTURAL ASPHALT SHINGLES ALUMINUM GUTTER TYP STANDING SEAM METAL ROOFING WHITE PVC TRIM TYP WHITE PVC TRIM TYPSPLIT FACED CMU TYP BOARD AND BATTEN VINYL SIDING AT GABLE INSETS TYP HARDIE CLAPBOARD SIDING BOARD AND BATTEN VINYL SIDING AT GABLE INSETS TYP ALL SIGNAGE SHOWN AT 1'6" HIGH 14' - 0" TYP N 195 Scott Swamp Road Farmington, CT 06032 qamarch.com Issue Dates: Project #: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY E:\REVIT LOCAL\DSCW Mdl2_rpetitto.rvt6/29/2026 4:32:25 PM A3.0 ELEVATIONS MUNICIPAL REVIEW 05.04.2026 QAM25090 DIAMOND SPARKLE CAR WASH PROJECT DESCRIPTION: SIMSBURY, CT Revisions 1/8" = 1'-0"A3.0 1 ENTRY (EAST) 1/8" = 1'-0"A3.0 2 EXIT/DETAIL BAY (WEST)
Page 59
ENTER ENTER ENTER EXIT ARCHITECTURAL ASPHALT SHINGLES ALUMINUM GUTTER TYP STANDING SEAM METAL ROOFING WHITE PVC TRIM TYP WHITE PVC TRIM TYPSPLIT FACED CMU TYP BOARD AND BATTEN VINYL SIDING AT GABLE INSETS TYP HARDIE CLAPBOARD SIDING BOARD AND BATTEN VINYL SIDING AT GABLE INSETS TYP ALUMINUM STOREFRONT TYP ENTEREXIT ARCHITECTURAL ASPHALT SHINGLES ALUMINUM GUTTER TYP STANDING SEAM METAL ROOFING WHITE PVC TRIM TYP WHITE PVC TRIM TYPSPLIT FACED CMU TYP HARDIE CLAPBOARD SIDING BOARD AND BATTEN VINYL SIDING AT GABLE INSETS TYP ALUMINUM STOREFRONT TYP WHITE PVC TRIM TYP N 195 Scott Swamp Road Farmington, CT 06032 qamarch.com Issue Dates: Project #: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY E:\REVIT LOCAL\DSCW Mdl2_rpetitto.rvt6/29/2026 4:32:27 PM A3.1 ELEVATIONS MUNICIPAL REVIEW 05.04.2026 QAM25090 DIAMOND SPARKLE CAR WASH PROJECT DESCRIPTION: SIMSBURY, CT 1/8" = 1'-0"A3.1 2 TOUCHLESS/SELF SERVICE BAY (NORTH) 1/8" = 1'-0"A3.1 1 OFFICE/MECH ROOM (SOUTH) Revisions
Page 60
MASTER DEVELOPMENT PLAN STORMWATER MANAGEMENT REPORT SITE MODIFICATION - LOT F PROPOSED DIAMOND SPARKLE CAR WASH 10 DORSET CROSSING SIMSBURY, CT PREPARED FOR APPLICANT DIAMOND SPARKLE CAR WASH, LLC 359 LEBANON AVENUE COLCHESTER, CT 06415 DATE: JUNE 29, 2026 REVISED:
Page 61
Page 62
DIAMOND SPARKLE CAR WASH 10 DORSET CROSSING SIMSBURY, CONNECTICUT TOC TABLE OF CONTENTS APPLICANT / SITE INFORMATION ...................................................................................................... 1 PROJECT DESCRIPTION AND PURPOSE ............................................................................................ 1 DESCRIPTION OF EXISTING SITE ....................................................................................................... 2 STORMWATER MANAGEMENT .......................................................................................................... 2 SUMMARY OF APPLICABLE DESIGN CRITERIA .................................................................... 2 SUMMARY OF LID TO REDUCE STORMWATER RUNOFF AND POLLUTANTS ............... 3 STRUCTURAL STORMWATER BMP TREATMENT AND POLLUTANT REMOVAL .......... 3 PEAK FLOW CONTROL ................................................................................................................ 4 PEAK FLOW CALCULATIONS .................................................................................................... 5 CONCLUSION ................................................................................................................................. 5 CONSTRUCTION EROSION AND SEDIMENT CONTROL ................................................................ 5 OPERATION AND MAINTENANCE ...................................................................................................... 5 TABLES TABLE 1: PROPOSED TREATMENT SUMMARY ............................................................................... 4 TABLE 2: PEAK FLOW COMPARISON ................................................................................................ 5 APPENDICES A. DRAINAGE MAPS B. HYDROLOGIC CALCULATIONS C. TREATMENT CALCULATIONS D. SUPPLEMENTAL DATA
Page 63
Page 64
DIAMOND SPARKLE CAR WASH 10 DORSET CROSSING SIMSBURY, CONNECTICUT 1 APPLICANT / SITE INFORMATION OWNER APPLICANT Dorset Crossing LLC Diamond Sparkle Car Wash, LLC 30 Dorset Crossing 359 Lebanon Avenue Simsbury, CT 06070 Colchester, CT 06415 SITE Map I04, Block 403, Lot 13-C-F 10 Dorset Crossing Simsbury, CT PROJECT DESCRIPTION AND PURPOSE Diamond Sparkle Car Wash, LLC proposes to construct a new car wash facility and as sociated site improvements on a vacant 1.08-acre parcel of land located at 10 Dorset Crossing to the northwest of the intersection of Dorset Crossing and Hopmeadow Street (Route 10 & 202) in Simsbury, CT. The parcel is identified as Map I04, Block 403, Lot 13-C-F on Town of Simsbury Tax Assessor Mapping and is depicted as “Lot F” on a plan entitled “Master Development Plan Prepared for Dorset Crossing, LLC, Dorset Cr ossing Drive, Simsbury, Connecticut ”, Sheet MA -1, Date : 12-03-2021 as Revised Through 09- 22-2023, Scale: 1” = 100’, prepared by F.A. Hesketh & Associates, Inc. The above- described parcel is hereinafter referred to as “Site”. Lot F was originally approved sometime prior to 2012 for a 14,000 square foot retail building as part of a Planned Area Development. In 2023 Lot F was approved for a 10,000 square foot mixed use retail/ office building and a 2,000 square foot mixed use retail /office building modification to the original PAD. The proposed car wash facility will consist of the construction of a 7,275 square-foot single-story building with automatic, touchless, and self-serve wash bays, detail bays, equipment room, and office space. Main access will be provided from an existing driveway serving the PAD to the west via a new connection. The full development will include the following improvements: • 7,275 sf car wash building • Automatic tunnel pay canopy • 36’ wide primary access driveway with single ingress and egress lanes • 24’ internal driveways serving parking areas and queuing lanes • 13’ wide perimeter bypass lane • 16 parking spaces including ADA, standard, and vacuum • Internal pedestrian sidewalks • Pole-mounted area lighting of driveways and parking areas • Stormwater management systems connecting to the existing PAD drainage facilities • Sanitary sewer lateral connection to the existing main in the westerly PAD driveway • Domestic water service connections to the existing stubs at the northwest corner of the Site • Electric and telecommunication utility connections to the existing facilities on Site
Page 65
DIAMOND SPARKLE CAR WASH 10 DORSET CROSSING SIMSBURY, CONNECTICUT 2 This stormwater management report has been prepared by Brandon Handfield, PE, a professional engineer licensed in the State of Connecticut with Yantic River Consultants, LLC (YRC) and provides a comprehensive evaluation of the developed car wash Site as compared to approved PAD conditions. This report concludes that; approved PAD drainage patterns will be generally maintained, there will be zero net increase in p eak flow rates connecting to the existing PAD drainage systems , and stormwater will be retained and treated to the maximum extent achievable in accordance with the 2023 DEEP Stormwater Quality Manual and the original PAD design intent. DESCRIPTION OF EXISTING SITE The existing 1.08-acre Site is currently undeveloped. TOPOGRAPHY – Topography of the parcel consists of a high point along the northern boundary and gently sloping to the south towards Dorset Crossing. The existing slopes are flat to moderate ranging from 2% to 5%. SOILS – The USDA NRCS Web Soil Survey depicts the Site within two soil types, Merrimac fine sandy load (34A) to the southeast and Hinckley loamy sand to the north and west. Both soil types have a Hydrologic Soil Group (HSG) rating of A and are well-drained. VEGETATION – Vegetation consists of maintained lawn area. There are no mature trees or shrubs. DRAINAGE – Stormwater collection, treatment, and attenuation systems were installed as part of the initial phases of the PAD development, including on and/or adjacent to the Site. These systems appear to be in general conformance with a plan obtained by YRC entitled “Utility Plan Prepared for Dorset Crossing, Hopmea dow Street, Simsbury, Connec ticut”, Sheet UT -1, Date : 09-16-2011 as R evised Through 10/10/11, Scale : 1 ” = 40 ’, Pre pared by F.A. Hesketh & Associates, Inc. YRC has also obtained construction submittals documenting proprietary stormwater treatment and subsurface detention measures installed on the Site. The Site generally drains to two separate Syste ms designed and installed for the PAD developme nt. See Map DA-3-1 within Appendix A. • System #1 collects runoff from the western half of the Site , developed portions of Lot A, developed portions of Lot F, and Dorset Crossing. This System discharges into Water Quality Basin #3 to the southwest. • System #2 receives runoff from the eastern hal f of the Site and eastern portion of Dorset Crossing at the intersect ion with Hopmeadow Street. This system discharges through a Contech STC 900 hydrodynamic separator and into a subsurface R etain-It detention syste m lined with an impermeable Dura-Skrim membrane, both of which are located on the Site within a drainage easement in favor of the Town of Simsbury. STORMWATER MANAGEMENT The following Standards were considered in the analysis and design. SUMMARY OF APPLICABLE DESIGN CRITERIA Hydrologic Design Criteria: TR-55 Hydraulic Design Criteria: CTDOT Drainage Manual
Page 66
DIAMOND SPARKLE CAR WASH 10 DORSET CROSSING SIMSBURY, CONNECTICUT 3 Climate Change Considerations: CT DEEP Stormwater Quality Manual Flood Hazard Areas: N/A Aquifer Protection Areas: Located within APA Treatment and Pollutant Removal: CT DEEP Stormwater Quality Manual Peak Flow Control Goal: Zero Net Increase in Peak Flow from Site SUMMARY OF LID TO REDUCE STORMWATER RUNOFF AND POLLUTANTS Low Impact Development techniques were implemented to the maximum extent achievable prior to the consideration of structural stormwater best management practices (BMP) in accordance with the 2023 SQM. A li st of LID techniques implemented into the design are provided below . It should be noted that as a conservative measure the design of the structural stormwater BMP does not take into consideration the hydrologic benefit of these measures. • Minimize clearing: There are no mature trees on the Site. Not applicable. • Minimize building footprint: The proposed car wash building has a footprint area of 7,275 sf, which is less tha n the original approved development and slightly larger tha n the 2023 modification. The building footprint has been reduced to the greatest extent possible while still achieving the purpose of the project. • Minimize roadways , parking, and impervious surfaces: Access drivew ay and p arking quantities meet the minimum needs of the proposed car wash use. Proposed impervious surfaces are approximately 90% of the 2023 modification. • Use of low maintenance landscaping: Low maintenance and 100% native plantings have been proposed by the project landscape architect. • Disconnection of impervious surfaces: This technique has not been employed due to the presence of the aquifer protection area. STRUCTURAL STORMATER BMP TREATMENT AND POLLUTANT REMOVAL The design approach selected for the project meets the original design inte nt for the PAD while incorporating measures in conformance with the 2023 SQM. Treatment will consist of the following: measures: System #1 • Clean runoff from the proposed roof and yard drains within adjacent landscaped islands will discharge to a subsurface Stormtech MC -3500 infiltration system. The proposed system can fully retain and infiltrate all storm events up to the 100-year storm. • New catch basins will be installed with 48 ” deep sumps and hoods. In accordance with 2023 SQM Siting Considerations, each of these catch basins will be used in conjunction with other BMP’s (Water Quality Basin #3), are in an offline configuration, and have contributing watersheds less than 0.25 acres. • The existing catch basin located at the southwest corner of the Site will remain unchanged and continue to discharge to the System #1 collection system . A comparison of calculated water quality volumes and flows was performed for the southwest catch basin. The increases in WQV and WQF are negligible and do not warrant further modification.
Page 67
DIAMOND SPARKLE CAR WASH 10 DORSET CROSSING SIMSBURY, CONNECTICUT 4 System #2 • Stormwater will be collected within existing catch basins along the south and southeastern limits of the development installed as part of the original PAD devel opment. The existing basins discharge through an existing Contech STC 900 hydrodynamic separator. The existing STC 900 structure can accommodate the minor increase in calculated water quality flow from the contributing watershed associated with the 2023 SQM. The STC-900 can also handle the calculated 10-year bypass flow. Modification or replacement is not warranted. The existing Stormwater Management System installed on Site in combination with the proposed improvements provides adequate treatment in accordance with the 2023 Stormwater Quality Manual to the maximum extent achievable. PEAK FLOW CONTROL Peak flow rates were calculated using TR -55 methodology. Hydrology Studio 2026 v.3.0.0.44 was used to generate peak flows with the following parameters for existing and proposed conditions: • DRAINAGE AREA: Existing and proposed drainage areas were delineated based on approved plans, current topography, an d the proposed grading and drainage design . The same general discharge points and drainage patterns were maintained as compared to th e original approved development. See Appendix A for maps. • RAINFALL: Precipitation frequency and depth estimates (rainfall data) were obtained from NOAA Atlas 14, Volume 10, Version 3 at the Site geographic location. See Appendix D. • SOILS: The Site lies entirely within soils clas sified as HSG A based on NRCS Web Soil Survey. See Appendix D. • CURVE NUMBER: Composite curve numbers (CN) were calculated based on the land cover types with consideration of the hydrologic soil groups and slopes. • TIME OF CONCENTRATION: Both the approved and proposed development consists of short flow paths over mostly impervious surfaces. The minimum time of concentration (Tc) of 5 minutes was used for both existing and proposed conditions. • EXFILTRATION: For the purposes of calculating infiltration of clean runoff from the proposed roof and surrounding lands caped areas, an infiltration rate of 2.41 inches /hour was used in accordance with Table 10-2 for Loamy Sand within HSG A. SQM AREA DA IA WQV WQF Standard Label acre acre acre-ft cfs Method Vol Flow Area Note 2023 PR-102 ROOF 0.213 0.171 0.018 0.22 MC-3500 0.055 N/A N/A 100% WQV 2023 PR-200 1.140 0.792 0.083 1.03 STC 900 N/A 1.4 N/A 100% WQF 2023 PR-F-102 0.129 0.105 0.011 0.14 DEEP SUMP N/A N/A N/A <0.25 AC OK 2023 PR-F-301 0.177 0.139 0.015 0.18 DEEP SUMP N/A N/A N/A <0.25 AC OK 2004 EX-101 0.191 0.144 0.012 0.14 WQ BASIN #3 N/A N/A N/A Approved PAD 2023 EX-F100 0.138 0.126 0.013 0.16 WQ BASIN #3 N/A N/A N/A Negligible Change PROPOSED TREATMENT SQM TREATMENT SUMMARY TABLE COMPARISON OF SITE DRAINING TO SYSTEM #1 (WQ BASIN #3) WITHOUT ON-SITE TREATMENT TABLE 1: PROPOSED TREATMENT SUMMARY
Page 68
DIAMOND SPARKLE CAR WASH 10 DORSET CROSSING SIMSBURY, CONNECTICUT 5 PEAK FLOW CALCULATIONS A summary of flows (CFS) for existing and proposed conditions is provided below. As shown in the table above, peak flows discharging off site to System s #1 and #2 are lower than approved conditions. CONCLUSION The proposed development and stormwater management system will reduce peak flow rates discharging to the existing collection Systems #1 and #2 for the 1-year to 100-storm events, thereby meeting the zero net increase in stormwater runoff requirement. There are no anticipated adverse impacts on Dorset Crossing, Hopmeadow Street, or downstream properties. CONSTRUCTION EROSION AND SEDIMENT CONTROL A plan to control construction related impacts, including erosion, sedimentation, and other pollutant sources has been prepared in accordance with the 2023 Connecticut Guidelines for Soil Erosion and Sediment Control. The Erosion and Sediment Control Plan is included in the submitted plan set. OPERATION AND MAINTENANCE A long-term operation and maintenance plan shall be provided in advance of construction to ensure that stormwater management systems function as designed. EX EX EX EX vs. vs. vs. vs. PR PR PR PR 1 1.05 0.85 -0.20 0.25 0.28 0.03 1.30 1.13 -0.17 0.54 0.43 -0.11 2 1.38 1.19 -0.19 0.37 0.40 0.03 1.75 1.59 -0.16 0.80 0.67 -0.13 5 1.94 1.75 -0.19 0.56 0.60 0.04 2.50 2.35 -0.15 1.25 1.11 -0.14 10 2.39 2.21 -0.18 0.73 0.77 0.04 3.12 2.98 -0.14 1.63 1.48 -0.15 25 3.03 2.86 -0.17 0.96 1.00 0.04 3.99 3.85 -0.14 2.15 2.00 -0.15 50 3.49 3.32 -0.17 1.13 1.17 0.04 4.62 4.48 -0.14 2.53 2.39 -0.14 100 4.00 3.83 -0.17 1.32 1.35 0.03 5.32 5.18 -0.14 2.96 2.82 -0.14 Notes: Post-Development Reduction in Peak Flow Rates Post-Development Increase in Peak Flow Rates 0.1 cfs or less (Negligible) TABLE 2: PEAK FLOW COMPARISON APPROVED VS POST-DEVELOPMENT AREA 300 (NW) EX PREX PR AREA 100 (SW) AREA 200 (SE) EX STORM SYSTEM #1 HYDROLOGY STUDIO PEAK FLOW SUMMARY TABLE PR COMBINED FLOW EX PR SYSTEM #2
Page 69
Page 70
DIAMOND SPARKLE CAR WASH 10 DORSET CROSSING SIMSBURY, CONNECTICUT APPENDIX A DRAINAGE AREA MAPS DA-3-1: FAH DRAINAGE AREA PLAN – PIPE TO PIPE (09-16-2011) DA-01: DRAINAGE MAP - APPROVED SITE DA-02: DRAINAGE MAP - PROPOSED SITE DA-03: DRAINAGE MAP – PROPOSED TREATMENT
Page 71
Page 72
Page 73
PROPOSED CAR WASH
PREPARED FOR DIAMOND SPARKLE CAR WASH, LLC
DRAINAGE MAP - APPROVED SITE
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
CONTACT INFORMATION
DATE
6/29/26
SIMSBURY, CT10 DORSET CROSSING
SHEET
DA-01
SCALE: 1"= 60'
60 0 60
www.yrc-ne.comWeb:
(860) 367-7264Phone:
H
O
P
M
E
A
D
O
W
S
T
R
E
E
T
(C
T
R
O
U
T
E
10 &
202)
DORSET CROSSING DRIVE
LEGEND
MAP REFERENCES
0.230WOODS
0.230NO-MOW/BRUSH
0.339LANDSCAPE
0.998IA - ROOF/ROAD/WALK
NRCS SOIL
TC - SHALLOW CONC.
TC - SHEET FLOW
D.A. LIMIT (MEASURED)
CCNITEM
LND = 0.000
IMP = 0.308
A = 0.308 AC
EX-102 ROOF
LND = 0.047
IMP = 0.144
A = 0.191 AC
EX-101
LND = 0.105
IMP = 0.296
A = 0.401 AC
EX-200
LND = 0.044
IMP = 0.133
A = 0.177 AC
EX-300
PR-102 ROOF INF
TO WQ BASIN #3
DORSET CROSSING
EX-100 DISCHARGES TO
SYSTEM #3
TO WQ BASIN #3
THROUGH PAD
EX-300 DISCHARGES
SYSTEM #3
SYSTEM #1
RETAIN-IT TO STREET
THROUGH STS &
EX-200 DISCHARGES
SYSTEM #2
SIMSBURY, CONNECTICUT", DATE: 09-16-2011, SCALE 1" = 60' BY F.A. HESKETH & ASSOCIATES, INC.
"DRAINAGE AREA PLAN - PIPE TO PIPE PREPARED FOR DORSET CROSSING, DORSET CROSSING DRIVE,3.
HESKETH & ASSOCIATES, INC.
DATE: 09-16-2011 AS REVISED THROUGH 10/10/11, SCALE: 1" = 40', SHEET UT-1, PREPARED BY F.A.
"UTILITY PLAN PREPARED FOR DORSET CROSSING, HOPMEADOW STREET, SIMSBURY, CONNECTICUT"2.
09-22-2023, SCALE: 1" = 100', PREPARED BY F.A. HESKETH & ASSOCIATES, INC.
DORSET CROSSING DRIVE, SIMSBURY, CONNECTICUT", DATE: 12-03-2021 AS REVISED THROUGH
"DORSET CROSSING PAD, MASTER DEVELOPMENT PLAN PREPARED FOR DORSET CROSSING, LLC,1.Page 74
S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
W
S
WG
S
S
GG
EE
SET
CHD
FOUND
MON.'S
234
CL&P
3572
CL&P
235
CL&P
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
C
FLAG POLE
D
GA
TE
CONC. WALK
CONC. WALK
PROPOSED CAR WASH
PREPARED FOR DIAMOND SPARKLE CAR WASH, LLC
DRAINAGE MAP - PROPOSED SITE
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
CONTACT INFORMATION
DATE
6/29/26
SIMSBURY, CT10 DORSET CROSSING
SHEET
DA-02
SCALE: 1"= 60'
60 0 60
www.yrc-ne.comWeb:
(860) 367-7264Phone:
198
200
200
198
200
200
200
202
201
201
201
202
201
HO
P
M
E
A
DO
W
S
T
R
EET
(C
T
R
OU
TE
10
&
202
)
DORSET CROSSING DRIVE
LEGEND
MAP REFERENCES
0.230WOODS
0.230NO-MOW/BRUSH
0.339LANDSCAPE
0.998IA - ROOF/ROAD/WALK
NRCS SOIL
TC - SHALLOW CONC.
TC - SHEET FLOW
D.A. LIMIT (MEASURED)
CCNITEM
SOIL MAP & DATA OBTAINED FROM NRCS.5.
ELEVATION DATA OBTAINED FROM MAP REFERENCE 1 AND NOAA DATABASE.4.
ORTHOIMAGERY SPRING 2025 FROM NEARMAP.3.
HESKETH & ASSOCIATES, INC.
DATE: 09-16-2011 AS REVISED THROUGH 10/10/11, SCALE: 1" = 40', SHEET UT-1, PREPARED BY F.A.
"UTILITY PLAN PREPARED FOR DORSET CROSSING, HOPMEADOW STREET, SIMSBURY, CONNECTICUT"2.
09-22-2023, SCALE: 1" = 100', PREPARED BY F.A. HESKETH & ASSOCIATES, INC.
DORSET CROSSING DRIVE, SIMSBURY, CONNECTICUT", DATE: 12-03-2021 AS REVISED THROUGH
"DORSET CROSSING PAD, MASTER DEVELOPMENT PLAN PREPARED FOR DORSET CROSSING, LLC,1.
LND = 0.042
IMP = 0.171
A = 0.213 AC
PR-102 ROOF
LND = 0.047
IMP = 0.231
A = 0.278 AC
PR-101
LND = 0.133
IMP = 0.272
A = 0.405 AC
PR-200
LND = 0.038
IMP = 0.139
A = 0.177 AC
PR-300
PR-102 ROOF INF
TO WQ BASIN #3
DORSET CROSSING
PR-100 DISCHARGES TO
SYSTEM #3
TO WQ BASIN #3
THROUGH PAD
PR-300 DISCHARGES
SYSTEM #3
SYSTEM #1
RETAIN-IT TO STREET
THROUGH STS &
PR-200 DISCHARGES
SYSTEM #2Page 75
S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
W
S
WG
S
S
GG
EE
SET
CHD
FOUND
MON.'S
234
CL&P
3572
CL&P
235
CL&P
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
C
FLAG POLE
D
GA
TE
CONC. WALK
CONC. WALK
PROPOSED CAR WASH
PREPARED FOR DIAMOND SPARKLE CAR WASH, LLC
DRAINAGE MAP - PROPOSED TREATMENT
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
CONTACT INFORMATION
DATE
6/29/26
SIMSBURY, CT10 DORSET CROSSING
SHEET
DA-03
SCALE: 1"= 60'
60 0 60
www.yrc-ne.comWeb:
(860) 367-7264Phone:
198
200
200
198
200
200
200
202
201
201
201
202
201
HO
P
M
E
A
DO
W
S
T
R
EET
(C
T
R
OU
TE
10
&
202
)
DORSET CROSSING DRIVE
LEGEND
MAP REFERENCES
0.230WOODS
0.230NO-MOW/BRUSH
0.339LANDSCAPE
0.998IA - ROOF/ROAD/WALK
NRCS SOIL
TC - SHALLOW CONC.
TC - SHEET FLOW
D.A. LIMIT (MEASURED)
CCNITEM
SOIL MAP & DATA OBTAINED FROM NRCS.5.
ELEVATION DATA OBTAINED FROM MAP REFERENCE 1 AND NOAA DATABASE.4.
ORTHOIMAGERY SPRING 2025 FROM NEARMAP.3.
HESKETH & ASSOCIATES, INC.
DATE: 09-16-2011 AS REVISED THROUGH 10/10/11, SCALE: 1" = 40', SHEET UT-1, PREPARED BY F.A.
"UTILITY PLAN PREPARED FOR DORSET CROSSING, HOPMEADOW STREET, SIMSBURY, CONNECTICUT"2.
09-22-2023, SCALE: 1" = 100', PREPARED BY F.A. HESKETH & ASSOCIATES, INC.
DORSET CROSSING DRIVE, SIMSBURY, CONNECTICUT", DATE: 12-03-2021 AS REVISED THROUGH
"DORSET CROSSING PAD, MASTER DEVELOPMENT PLAN PREPARED FOR DORSET CROSSING, LLC,1.
LND = 0.042
IMP = 0.171
A = 0.213 AC
PR-102 ROOF
TO WQ BASIN #3
DORSET CROSSING
PR-100 DISCHARGES TO
SYSTEM #3
TO WQ BASIN #3
THROUGH PAD
PR-300 DISCHARGES
SYSTEM #3
LND = 0.348
IMP = 0.792
A = 1.140 AC
CONTECH STC 900
PR-200
LND = 0.038
IMP = 0.139
A = 0.177 AC
48" SUMP W/ HOOD
PR-F-301
LND = 0.024
IMP = 0.105
A = 0.129 AC
48" SUMP W/ HOOD
PR-F-102
LND = 0.012
IMP = 0.126
A = 0.138 AC
EX-F-100
BMP'S (WQ BASIN #3)
VIA ORIGINAL INSTALLED
EX-F-100 TREATED
PROPOSED SITE
ADEQUATE FOR
CONTECH STC 900
& INFILTRATED
ALL STORMS RETAINED
PR-102 ROOF INFPage 76
DIAMOND SPARKLE CAR WASH 10 DORSET CROSSING SIMSBURY, CONNECTICUT APPENDIX B HYDROLOGIC COMPUTATIONS HYDROLOGY STUDIO PEAK FLOW SUMMARY TABLE HYDROLOGY STUDIO REPORT
Page 77
Page 78
10 DORSET CROSSING SIMSBURY, CT EX EX EX EX vs. vs. vs. vs. PR PR PR PR 1 1.05 0.85 -0.20 0.25 0.28 0.03 1.30 1.13 -0.17 0.54 0.43 -0.11 2 1.38 1.19 -0.19 0.37 0.40 0.03 1.75 1.59 -0.16 0.80 0.67 -0.13 5 1.94 1.75 -0.19 0.56 0.60 0.04 2.50 2.35 -0.15 1.25 1.11 -0.14 10 2.39 2.21 -0.18 0.73 0.77 0.04 3.12 2.98 -0.14 1.63 1.48 -0.15 25 3.03 2.86 -0.17 0.96 1.00 0.04 3.99 3.85 -0.14 2.15 2.00 -0.15 50 3.49 3.32 -0.17 1.13 1.17 0.04 4.62 4.48 -0.14 2.53 2.39 -0.14 100 4.00 3.83 -0.17 1.32 1.35 0.03 5.32 5.18 -0.14 2.96 2.82 -0.14 Notes: Post-Development Reduction in Peak Flow Rates Post-Development Increase in Peak Flow Rates 0.1 cfs or less (Negligible) HYDROLOGY STUDIO PEAK FLOW SUMMARY TABLE PR SYSTEM #3 EX PR SYSTEM #2 TABLE 1: PEAK FLOW COMPARISON PRE- & POST-DEVELOPMENT AREA 300 (NW) EX PREX PR AREA 100 (SW) AREA 200 (SE) EX STORM SYSTEM #3
Page 79
Page 80
Table of Contents Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 Basin Model Schematic 1...................................................................................................................................... Hydrograph by Return Period 2............................................................................................................................ 1 - Year Hydrograph Summary 3.................................................................................................................................. Hydrograph Reports Hydrograph No. 1, NRCS Runoff, EX-101 4.............................................................................................. Hydrograph No. 2, NRCS Runoff, EX-102 ROOF 5..................................................................................... Hydrograph No. 3, Junction, EX-100 6..................................................................................................... Hydrograph No. 4, NRCS Runoff, EX-200 (SYSTEM #1) 7........................................................................... Hydrograph No. 5, NRCS Runoff, EX-300 8.............................................................................................. Hydrograph No. 6, Junction, EX-SYSTEM #3 9.......................................................................................... Hydrograph No. 7, NRCS Runoff, PR-101 10............................................................................................ Hydrograph No. 8, NRCS Runoff, PR-102 ROOF 11................................................................................... Hydrograph No. 9, Junction, PR-100 12................................................................................................... Hydrograph No. 10, Pond Route, PR-102 ROOF INF 13.............................................................................. Detention Pond Reports - F-ROOF INF-100 14.............................................................................. Hydrograph No. 11, NRCS Runoff, PR-200 (SYSTEM #1) 18........................................................................ Hydrograph No. 12, NRCS Runoff, PR-300 19........................................................................................... Hydrograph No. 13, Junction, PR-SYSTEM #3 20...................................................................................... Hydrograph No. 14, Rational, PR-200 STC 900 21..................................................................................... Design Storm Report - NOAA-D, 24-hr 22..................................................................................... 2 - Year Hydrograph Summary 23................................................................................................................................ Hydrograph Reports Hydrograph No. 1, NRCS Runoff, EX-101 24............................................................................................. Hydrograph No. 2, NRCS Runoff, EX-102 ROOF 25................................................................................... Hydrograph No. 3, Junction, EX-100 26................................................................................................... Hydrograph No. 4, NRCS Runoff, EX-200 (SYSTEM #1) 27......................................................................... Hydrograph No. 5, NRCS Runoff, EX-300 28............................................................................................. Hydrograph No. 6, Junction, EX-SYSTEM #3 29........................................................................................ Hydrograph No. 7, NRCS Runoff, PR-101 30............................................................................................ Hydrograph No. 8, NRCS Runoff, PR-102 ROOF 31................................................................................... Hydrograph No. 9, Junction, PR-100 32................................................................................................... Hydrograph No. 10, Pond Route, PR-102 ROOF INF 33.............................................................................. Hydrograph No. 11, NRCS Runoff, PR-200 (SYSTEM #1) 34........................................................................ Hydrograph No. 12, NRCS Runoff, PR-300 35...........................................................................................
Page 81
Contents continued... Hydrograph No. 13, Junction, PR-SYSTEM #3 36...................................................................................... Hydrograph No. 14, Rational, PR-200 STC 900 37..................................................................................... Design Storm Report - NOAA-D, 24-hr 38..................................................................................... 5 - Year Hydrograph Summary 39................................................................................................................................ Hydrograph Reports Hydrograph No. 1, NRCS Runoff, EX-101 40............................................................................................. Hydrograph No. 2, NRCS Runoff, EX-102 ROOF 41................................................................................... Hydrograph No. 3, Junction, EX-100 42................................................................................................... Hydrograph No. 4, NRCS Runoff, EX-200 (SYSTEM #1) 43......................................................................... Hydrograph No. 5, NRCS Runoff, EX-300 44............................................................................................. Hydrograph No. 6, Junction, EX-SYSTEM #3 45........................................................................................ Hydrograph No. 7, NRCS Runoff, PR-101 46............................................................................................ Hydrograph No. 8, NRCS Runoff, PR-102 ROOF 47................................................................................... Hydrograph No. 9, Junction, PR-100 48................................................................................................... Hydrograph No. 10, Pond Route, PR-102 ROOF INF 49.............................................................................. Hydrograph No. 11, NRCS Runoff, PR-200 (SYSTEM #1) 50........................................................................ Hydrograph No. 12, NRCS Runoff, PR-300 51........................................................................................... Hydrograph No. 13, Junction, PR-SYSTEM #3 52...................................................................................... Hydrograph No. 14, Rational, PR-200 STC 900 53..................................................................................... Design Storm Report - NOAA-D, 24-hr 54..................................................................................... 10 - Year Hydrograph Summary 55................................................................................................................................ Hydrograph Reports Hydrograph No. 1, NRCS Runoff, EX-101 56............................................................................................. Hydrograph No. 2, NRCS Runoff, EX-102 ROOF 57................................................................................... Hydrograph No. 3, Junction, EX-100 58................................................................................................... Hydrograph No. 4, NRCS Runoff, EX-200 (SYSTEM #1) 59......................................................................... Hydrograph No. 5, NRCS Runoff, EX-300 60............................................................................................. Hydrograph No. 6, Junction, EX-SYSTEM #3 61........................................................................................ Hydrograph No. 7, NRCS Runoff, PR-101 62............................................................................................ Hydrograph No. 8, NRCS Runoff, PR-102 ROOF 63................................................................................... Hydrograph No. 9, Junction, PR-100 64................................................................................................... Hydrograph No. 10, Pond Route, PR-102 ROOF INF 65.............................................................................. Hydrograph No. 11, NRCS Runoff, PR-200 (SYSTEM #1) 66........................................................................ Hydrograph No. 12, NRCS Runoff, PR-300 67...........................................................................................
Page 82
Contents continued... Hydrograph No. 13, Junction, PR-SYSTEM #3 68...................................................................................... Hydrograph No. 14, Rational, PR-200 STC 900 69..................................................................................... Design Storm Report - NOAA-D, 24-hr 70..................................................................................... 25 - Year Hydrograph Summary 71................................................................................................................................ Hydrograph Reports Hydrograph No. 1, NRCS Runoff, EX-101 72............................................................................................. Hydrograph No. 2, NRCS Runoff, EX-102 ROOF 73................................................................................... Hydrograph No. 3, Junction, EX-100 74................................................................................................... Hydrograph No. 4, NRCS Runoff, EX-200 (SYSTEM #1) 75......................................................................... Hydrograph No. 5, NRCS Runoff, EX-300 76............................................................................................. Hydrograph No. 6, Junction, EX-SYSTEM #3 77........................................................................................ Hydrograph No. 7, NRCS Runoff, PR-101 78............................................................................................ Hydrograph No. 8, NRCS Runoff, PR-102 ROOF 79................................................................................... Hydrograph No. 9, Junction, PR-100 80................................................................................................... Hydrograph No. 10, Pond Route, PR-102 ROOF INF 81.............................................................................. Hydrograph No. 11, NRCS Runoff, PR-200 (SYSTEM #1) 82........................................................................ Hydrograph No. 12, NRCS Runoff, PR-300 83........................................................................................... Hydrograph No. 13, Junction, PR-SYSTEM #3 84...................................................................................... Hydrograph No. 14, Rational, PR-200 STC 900 85..................................................................................... Design Storm Report - NOAA-D, 24-hr 86..................................................................................... 50 - Year Hydrograph Summary 87................................................................................................................................ Hydrograph Reports Hydrograph No. 1, NRCS Runoff, EX-101 88............................................................................................. Hydrograph No. 2, NRCS Runoff, EX-102 ROOF 89................................................................................... Hydrograph No. 3, Junction, EX-100 90................................................................................................... Hydrograph No. 4, NRCS Runoff, EX-200 (SYSTEM #1) 91......................................................................... Hydrograph No. 5, NRCS Runoff, EX-300 92............................................................................................. Hydrograph No. 6, Junction, EX-SYSTEM #3 93........................................................................................ Hydrograph No. 7, NRCS Runoff, PR-101 94............................................................................................ Hydrograph No. 8, NRCS Runoff, PR-102 ROOF 95................................................................................... Hydrograph No. 9, Junction, PR-100 96................................................................................................... Hydrograph No. 10, Pond Route, PR-102 ROOF INF 97.............................................................................. Hydrograph No. 11, NRCS Runoff, PR-200 (SYSTEM #1) 98........................................................................ Hydrograph No. 12, NRCS Runoff, PR-300 99...........................................................................................
Page 83
Contents continued... Hydrograph No. 13, Junction, PR-SYSTEM #3 100.................................................................................... Hydrograph No. 14, Rational, PR-200 STC 900 101................................................................................... Design Storm Report - NOAA-D, 24-hr 102................................................................................... 100 - Year Hydrograph Summary 103.............................................................................................................................. Hydrograph Reports Hydrograph No. 1, NRCS Runoff, EX-101 104........................................................................................... Hydrograph No. 2, NRCS Runoff, EX-102 ROOF 105................................................................................. Hydrograph No. 3, Junction, EX-100 106.................................................................................................. Hydrograph No. 4, NRCS Runoff, EX-200 (SYSTEM #1) 107........................................................................ Hydrograph No. 5, NRCS Runoff, EX-300 108........................................................................................... Hydrograph No. 6, Junction, EX-SYSTEM #3 109...................................................................................... Hydrograph No. 7, NRCS Runoff, PR-101 110........................................................................................... Hydrograph No. 8, NRCS Runoff, PR-102 ROOF 111.................................................................................. Hydrograph No. 9, Junction, PR-100 112.................................................................................................. Hydrograph No. 10, Pond Route, PR-102 ROOF INF 113............................................................................ Hydrograph No. 11, NRCS Runoff, PR-200 (SYSTEM #1) 114...................................................................... Hydrograph No. 12, NRCS Runoff, PR-300 115......................................................................................... Hydrograph No. 13, Junction, PR-SYSTEM #3 116..................................................................................... Hydrograph No. 14, Rational, PR-200 STC 900 117.................................................................................... Design Storm Report - NOAA-D, 24-hr 118................................................................................... IDF Report 119....................................................................................................................................................... Precipitation Report 120........................................................................................................................................
Page 84
Basin Model Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 1
Page 85
Hydrograph by Return Period Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 Hyd. No. Hydrograph Type Hydrograph Name Peak Outflow (cfs) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 NRCS Runoff EX-101 0.272 0.397 0.611 0.792 1.042 1.223 1.425 2 NRCS Runoff EX-102 ROOF 0.781 0.987 1.323 1.601 1.984 2.261 2.571 3 Junction EX-100 1.053 1.384 1.935 2.392 3.027 3.485 3.997 4 NRCS Runoff EX-200 (SYSTEM #1) 0.542 0.802 1.248 1.625 2.151 2.531 2.956 5 NRCS Runoff EX-300 0.250 0.366 0.564 0.731 0.963 1.131 1.318 6 Junction EX-SYSTEM #3 1.303 1.750 2.499 3.123 3.990 4.615 5.315 7 NRCS Runoff PR-101 0.498 0.690 1.008 1.272 1.634 1.894 2.185 8 NRCS Runoff PR-102 ROOF 0.353 0.498 0.740 0.942 1.221 1.422 1.645 9 Junction PR-100 0.851 1.188 1.749 2.214 2.855 3.316 3.830 10 Pond Route PR-102 ROOF INF 0.000 0.000 0.000 0.000 0.000 0.000 0.106 11 NRCS Runoff PR-200 (SYSTEM #1) 0.432 0.674 1.105 1.477 2.003 2.386 2.816 12 NRCS Runoff PR-300 0.278 0.397 0.598 0.766 0.998 1.165 1.351 13 Junction PR-SYSTEM #3 1.129 1.585 2.347 2.979 3.853 4.481 5.181 14 Rational PR-200 STC 900 3.431 4.096 5.204 6.107 8.108 9.948 11.59 2
Page 86
Hydrograph 1-yr Summary Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 Hyd. No. Hydrograph Type Hydrograph Name Peak Flow (cfs) Time to Peak (hrs) Hydrograph Volume (cuft) Inflow Hyd(s) Maximum Elevation (ft) Maximum Storage (cuft) 1 NRCS Runoff EX-101 0.272 12.12 842 ---- 2 NRCS Runoff EX-102 ROOF 0.781 12.12 2,756 ---- 3 Junction EX-100 1.053 12.12 3,597 1, 2 4 NRCS Runoff EX-200 (SYSTEM #1) 0.542 12.12 1,681 ---- 5 NRCS Runoff EX-300 0.250 12.12 774 ---- 6 Junction EX-SYSTEM #3 1.303 12.12 4,371 3, 5 7 NRCS Runoff PR-101 0.498 12.12 1,547 ---- 8 NRCS Runoff PR-102 ROOF 0.353 12.12 1,091 ---- 9 Junction PR-100 0.851 12.12 2,638 7, 8 10 Pond Route PR-102 ROOF INF 0.000 18.38 0.000 8 193.57 277 11 NRCS Runoff PR-200 (SYSTEM #1) 0.432 12.12 1,363 ---- 12 NRCS Runoff PR-300 0.278 12.12 859 ---- 13 Junction PR-SYSTEM #3 1.129 12.12 3,497 9, 12 14 Rational PR-200 STC 900 3.431 0.08 1,544 ---- 3
Page 87
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-101 Hyd. No. 1 Hydrograph Type = NRCS Runoff Peak Flow = 0.272 cfs Storm Frequency = 1-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 842 cuft Drainage Area = 0.191 ac Curve Number = 83.48* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 2.62 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.144 98.00 Impervious 0.047 39.00 Landscape 0.191 83.48 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.02 0.04 0.06 0.08 0.1 0.12 0.14 0.16 0.18 0.2 0.22 0.24 0.26 0.28 Qp = 0.272 cfs 4
Page 88
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-102 ROOF Hyd. No. 2 Hydrograph Type = NRCS Runoff Peak Flow = 0.781 cfs Storm Frequency = 1-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 2,756 cuft Drainage Area = 0.308 ac Curve Number = 98.00* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 2.62 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.308 98.00 Impervious 0.308 98.00 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.55 0.6 0.65 0.7 0.75 0.8 0.85 0.9 0.95 1 Qp = 0.781 cfs 5
Page 89
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-100 Hyd. No. 3 Hydrograph Type = Junction Peak Flow = 1.053 cfs Storm Frequency = 1-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 3,597 cuft Inflow Hydrographs = 1, 2 Total Contrib. Area = 0.499 ac EX-101 EX-102 ROOF EX-100 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.053 cfs 6
Page 90
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-200 (SYSTEM #1) Hyd. No. 4 Hydrograph Type = NRCS Runoff Peak Flow = 0.542 cfs Storm Frequency = 1-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 1,681 cuft Drainage Area = 0.401 ac Curve Number = 82.55* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 2.62 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.296 98.00 Impervious 0.105 39.00 Landscape 0.401 82.55 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.55 0.6 0.65 0.7 0.75 0.8 0.85 0.9 0.95 1 Qp = 0.542 cfs 7
Page 91
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-300 Hyd. No. 5 Hydrograph Type = NRCS Runoff Peak Flow = 0.250 cfs Storm Frequency = 1-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 774 cuft Drainage Area = 0.177 ac Curve Number = 83.33* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 2.62 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.133 98.00 Impervious 0.044 39.00 Landscape 0.177 83.33 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.02 0.04 0.06 0.08 0.1 0.12 0.14 0.16 0.18 0.2 0.22 0.24 0.26 Qp = 0.250 cfs 8
Page 92
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-SYSTEM #3 Hyd. No. 6 Hydrograph Type = Junction Peak Flow = 1.303 cfs Storm Frequency = 1-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 4,371 cuft Inflow Hydrographs = 5 Total Contrib. Area = 0.177 ac EX-100 EX-300 EX-SYSTEM #3 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.303 cfs 9
Page 93
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-101 Hyd. No. 7 Hydrograph Type = NRCS Runoff Peak Flow = 0.498 cfs Storm Frequency = 1-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 1,547 cuft Drainage Area = 0.278 ac Curve Number = 88.03* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 2.62 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.231 98.00 Impervious 0.047 39.00 Landscape 0.278 88.03 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.04 0.08 0.12 0.16 0.2 0.24 0.28 0.32 0.36 0.4 0.44 0.48 Qp = 0.498 cfs 10
Page 94
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-102 ROOF Hyd. No. 8 Hydrograph Type = NRCS Runoff Peak Flow = 0.353 cfs Storm Frequency = 1-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 1,091 cuft Drainage Area = 0.213 ac Curve Number = 86.37* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 2.62 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.171 98.00 Impervious 0.042 39.00 Landscape 0.213 86.37 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.02 0.04 0.06 0.08 0.1 0.12 0.14 0.16 0.18 0.2 0.22 0.24 0.26 0.28 0.3 0.32 0.34 0.36 Qp = 0.353 cfs 11
Page 95
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-100 Hyd. No. 9 Hydrograph Type = Junction Peak Flow = 0.851 cfs Storm Frequency = 1-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 2,638 cuft Inflow Hydrographs = 7, 8 Total Contrib. Area = 0.491 ac PR-101 PR-102 ROOF PR-100 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.55 0.6 0.65 0.7 0.75 0.8 0.85 0.9 0.95 1 Qp = 0.851 cfs 12
Page 96
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-102 ROOF INF Hyd. No. 10 Hydrograph Type = Pond Route Peak Flow = 0.000 cfs Storm Frequency = 1-yr Time to Peak = 18.38 hrs Time Interval = 1 min Hydrograph Volume = 0.000 cuft Inflow Hydrograph = 8 - PR-102 ROOF Max. Elevation = 193.57 ft Pond Name = F-ROOF INF-100 Max. Storage = 277 cuft Pond Routing by Storage Indication Method PR-102 ROOF PR-102 ROOF INF Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 0 0.02 0.04 0.06 0.08 0.1 0.12 0.14 0.16 0.18 0.2 0.22 0.24 0.26 0.28 0.3 0.32 0.34 0.36 Qp = 0.000 cfs 13
Page 97
Pond Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 F-ROOF INF-100 Stage-Storage Description Input Stage / Storage Table Stage (in) Elevation (ft) Contour Area (sqft) Incr. Storage (cuft) Total Storage (cuft) StormTech® MC-3500™ Chamber Chamber Height, in Chamber Shape Chamber Width, in Installed Length, ft No. Chambers Bare Chamber Stor, cuft No. Rows Space Between Rows, in Stone Above, in Stone Below, in Stone Sides, in Stone Ends, in Encasement Voids, % Encasement Bottom Elevation, ft 45 Arch 77 7.17 16 1,758 2 9 12 9 12 12 40.00 192.90 0.0 192.90 994 0.000 0.000 3.3 193.18 994 109 109 6.6 193.45 994 109 219 9.9 193.73 994 136 354 13.2 194.00 994 211 565 16.5 194.28 994 210 775 19.8 194.55 994 209 984 23.1 194.83 994 207 1,192 26.4 195.10 994 205 1,396 29.7 195.38 994 202 1,598 33.0 195.65 994 198 1,796 36.3 195.93 994 193 1,989 39.6 196.20 994 187 2,176 42.9 196.48 994 180 2,356 46.2 196.75 994 172 2,528 49.5 197.03 994 161 2,688 52.8 197.30 994 144 2,833 56.1 197.58 994 118 2,951 59.4 197.85 994 109 3,060 62.7 198.13 994 109 3,170 66.0 198.40 994 109 3,279 1-yr 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr UG Chambers Top of Pond Top of Chamber Invert of Chamber Top Stone Bottom Stone Total Storage (cuft) 0 500 1000 1500 2000 2500 3000 192 193 194 195 196 197 198 199 0 1 2 3 4 5 6 Stage-Storage 14
Page 98
Pond Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 F-ROOF INF-100 Stage-Discharge Culvert / Orifices Rise, in Span, in No. Barrels Invert Elevation, ft Orifice Coefficient, Co Length, ft Barrel Slope, % N-Value, n Cir Culvert Orifice 123 12 12 1 196.55 0.60 26 .6 0.013 Perforated Riser Hole Diameter, in No. holes Invert Elevation, ft Height, ft Orifice Coefficient, Co Weirs Shape / Type Crest Elevation, ft Crest Length, ft Angle, deg Weir Coefficient, Cw Riser Weir 123 Ancillary Exfiltration, in/hr 2.41** **Exfiltration extracted from outflow hydrograph. Rate applied to contours. Top of Pond 1-yr 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr Pond Outflow Discharge (cfs) 0 1 2 3 4 5 193 194 195 196 197 198 0 1 2 3 4 5 Stage-Discharge 15
Page 99
Pond Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 F-ROOF INF-100 Stage-Storage-Discharge Summary Stage (ft) Elev. (ft) Storage (cuft) Culvert (cfs) Orifices, cfs 123 Riser (cfs) Weirs, cfs 123 Pf Riser (cfs) Exfil (cfs) User (cfs) Total (cfs) 0.00 192.90 0.000 0.000 0.000 0.000 0.28 193.18 109 0.000 0.056 0.056 0.55 193.45 219 0.000 0.057 0.057 0.83 193.73 354 0.000 0.058 0.058 1.10 194.00 565 0.000 0.059 0.059 1.38 194.28 775 0.000 0.060 0.060 1.65 194.55 984 0.000 0.061 0.061 1.93 194.83 1,192 0.000 0.062 0.062 2.20 195.10 1,396 0.000 0.063 0.063 2.48 195.38 1,598 0.000 0.064 0.064 2.75 195.65 1,796 0.000 0.065 0.065 3.03 195.93 1,989 0.000 0.066 0.066 3.30 196.20 2,176 0.000 0.067 0.067 3.58 196.48 2,356 0.000 0.068 0.068 3.85 196.75 2,528 0.171 ic 0.069 0.240 4.13 197.03 2,688 0.763 oc 0.070 0.834 4.40 197.30 2,833 1.374 oc 0.071 1.445 4.68 197.58 2,951 1.766 oc 0.072 1.838 4.95 197.85 3,060 2.803 oc 0.073 2.876 5.23 198.13 3,170 3.549 oc 0.074 3.623 5.50 198.40 3,279 4.163 oc 0.075 4.238 Suffix key: ic = inlet control, oc = outlet control, s = submerged weir 16
Page 100
Pond Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 F-ROOF INF-100 Pond Drawdown Stage (ft) 17
Page 101
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-200 (SYSTEM #1) Hyd. No. 11 Hydrograph Type = NRCS Runoff Peak Flow = 0.432 cfs Storm Frequency = 1-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 1,363 cuft Drainage Area = 0.405 ac Curve Number = 78.62* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 2.62 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.272 98.00 Impervious 0.133 39.00 Landscape 0.405 78.62 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.02 0.04 0.06 0.08 0.1 0.12 0.14 0.16 0.18 0.2 0.22 0.24 0.26 0.28 0.3 0.32 0.34 0.36 0.38 0.4 0.42 0.44 Qp = 0.432 cfs 18
Page 102
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-300 Hyd. No. 12 Hydrograph Type = NRCS Runoff Peak Flow = 0.278 cfs Storm Frequency = 1-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 859 cuft Drainage Area = 0.177 ac Curve Number = 85.33* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 2.62 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.139 98.00 Impervious 0.038 39.00 Landscape 0.177 85.33 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.02 0.04 0.06 0.08 0.1 0.12 0.14 0.16 0.18 0.2 0.22 0.24 0.26 0.28 Qp = 0.278 cfs 19
Page 103
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-SYSTEM #3 Hyd. No. 13 Hydrograph Type = Junction Peak Flow = 1.129 cfs Storm Frequency = 1-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 3,497 cuft Inflow Hydrographs = 12 Total Contrib. Area = 0.177 ac PR-100 PR-300 PR-SYSTEM #3 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.129 cfs 20
Page 104
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-200 STC 900 Hyd. No. 14 Hydrograph Type = Rational Peak Flow = 3.431 cfs Storm Frequency = 1-yr Time to Peak = 0.08 hrs Time Interval = 1 min Runoff Volume = 1,544 cuft Drainage Area = 1.14 ac Runoff Coeff. = 0.72* Tc Method = User Time of Conc. (Tc) = 5.0 min IDF Curve = 20260625DORSET LOT F NOAA IDF.idf Intensity = 4.18 in/hr Freq. Corr. Factor = 1.00 Asc/Rec Limb Factors = 1/2 * Composite C Worksheet AREA (ac) C DESCRIPTION 0.792 0.90 Impervious 0.348 0.30 Landscape 1.14 0.72 Time (min) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 0 1 2 3 4 Qp = 3.431 cfs 21
Page 105
Design Storm Report Custom Storm filename: Hydrology Studio v 3.0.0.44 06-29-2026 Storm Distribution: NOAA-D, 24-hr Total Rainfall Volume (in)Storm Duration ✔ 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 24 hrs 2.62 3.29 0.00 4.39 5.30 6.56 7.47 8.49 Incremental Rainfall Distribution, 1-yr Time Time Time Time TimePrecip Precip Precip Precip Precip (hrs) (hrs) (hrs) (hrs) (hrs)(in) (in) (in) (in) (in) 11.60 0.007903 11.62 0.008319 11.63 0.008318 11.65 0.008319 11.67 0.008318 11.68 0.008319 11.70 0.008318 11.72 0.011410 11.73 0.011410 11.75 0.011410 11.77 0.011410 11.78 0.011410 11.80 0.011411 11.82 0.015833 11.83 0.015834 11.85 0.015833 11.87 0.015833 11.88 0.015834 11.90 0.015833 11.92 0.027314 11.93 0.027313 11.95 0.027314 11.97 0.027313 11.98 0.027314 12.00 0.027312 12.02 0.045574 12.03 0.045576 12.05 0.045574 12.07 0.045576 12.08 0.045574 12.10 0.045576 12.12 0.015833 12.13 0.015834 12.15 0.015833 12.17 0.015833 12.18 0.015834 12.20 0.015833 12.22 0.011410 12.23 0.011410 12.25 0.011410 12.27 0.011410 12.28 0.011410 12.30 0.011410 12.32 0.008318 12.33 0.008319 12.35 0.008318 12.37 0.008319 12.38 0.008318 12.40 0.008319 12.42 0.007903 12.43 0.007904 12.45 0.007903 12.47 0.007903 12.48 0.007904 12.50 0.007903 Time (hrs) 0 2 4 6 8 10 12 14 16 18 20 22 24 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2 2.2 2.4 2.6 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2 2.2 2.4 2.6 22
Page 106
Hydrograph 2-yr Summary Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 Hyd. No. Hydrograph Type Hydrograph Name Peak Flow (cfs) Time to Peak (hrs) Hydrograph Volume (cuft) Inflow Hyd(s) Maximum Elevation (ft) Maximum Storage (cuft) 1 NRCS Runoff EX-101 0.397 12.12 1,229 ---- 2 NRCS Runoff EX-102 ROOF 0.987 12.12 3,525 ---- 3 Junction EX-100 1.384 12.12 4,754 1, 2 4 NRCS Runoff EX-200 (SYSTEM #1) 0.802 12.12 2,478 ---- 5 NRCS Runoff EX-300 0.366 12.12 1,132 ---- 6 Junction EX-SYSTEM #3 1.750 12.12 5,885 3, 5 7 NRCS Runoff PR-101 0.690 12.12 2,165 ---- 8 NRCS Runoff PR-102 ROOF 0.498 12.12 1,550 ---- 9 Junction PR-100 1.188 12.12 3,715 7, 8 10 Pond Route PR-102 ROOF INF 0.000 17.57 0.000 8 193.89 484 11 NRCS Runoff PR-200 (SYSTEM #1) 0.674 12.12 2,092 ---- 12 NRCS Runoff PR-300 0.397 12.12 1,233 ---- 13 Junction PR-SYSTEM #3 1.585 12.12 4,948 9, 12 14 Rational PR-200 STC 900 4.096 0.08 1,843 ---- 23
Page 107
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-101 Hyd. No. 1 Hydrograph Type = NRCS Runoff Peak Flow = 0.397 cfs Storm Frequency = 2-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 1,229 cuft Drainage Area = 0.191 ac Curve Number = 83.48* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 3.29 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.144 98.00 Impervious 0.047 39.00 Landscape 0.191 83.48 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.02 0.04 0.06 0.08 0.1 0.12 0.14 0.16 0.18 0.2 0.22 0.24 0.26 0.28 0.3 0.32 0.34 0.36 0.38 0.4 Qp = 0.397 cfs 24
Page 108
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-102 ROOF Hyd. No. 2 Hydrograph Type = NRCS Runoff Peak Flow = 0.987 cfs Storm Frequency = 2-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 3,525 cuft Drainage Area = 0.308 ac Curve Number = 98.00* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 3.29 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.308 98.00 Impervious 0.308 98.00 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.55 0.6 0.65 0.7 0.75 0.8 0.85 0.9 0.95 1 Qp = 0.987 cfs 25
Page 109
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-100 Hyd. No. 3 Hydrograph Type = Junction Peak Flow = 1.384 cfs Storm Frequency = 2-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 4,754 cuft Inflow Hydrographs = 1, 2 Total Contrib. Area = 0.499 ac EX-101 EX-102 ROOF EX-100 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.384 cfs 26
Page 110
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-200 (SYSTEM #1) Hyd. No. 4 Hydrograph Type = NRCS Runoff Peak Flow = 0.802 cfs Storm Frequency = 2-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 2,478 cuft Drainage Area = 0.401 ac Curve Number = 82.55* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 3.29 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.296 98.00 Impervious 0.105 39.00 Landscape 0.401 82.55 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.55 0.6 0.65 0.7 0.75 0.8 0.85 0.9 0.95 1 Qp = 0.802 cfs 27
Page 111
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-300 Hyd. No. 5 Hydrograph Type = NRCS Runoff Peak Flow = 0.366 cfs Storm Frequency = 2-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 1,132 cuft Drainage Area = 0.177 ac Curve Number = 83.33* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 3.29 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.133 98.00 Impervious 0.044 39.00 Landscape 0.177 83.33 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.02 0.04 0.06 0.08 0.1 0.12 0.14 0.16 0.18 0.2 0.22 0.24 0.26 0.28 0.3 0.32 0.34 0.36 Qp = 0.366 cfs 28
Page 112
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-SYSTEM #3 Hyd. No. 6 Hydrograph Type = Junction Peak Flow = 1.750 cfs Storm Frequency = 2-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 5,885 cuft Inflow Hydrographs = 5 Total Contrib. Area = 0.177 ac EX-100 EX-300 EX-SYSTEM #3 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.750 cfs 29
Page 113
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-101 Hyd. No. 7 Hydrograph Type = NRCS Runoff Peak Flow = 0.690 cfs Storm Frequency = 2-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 2,165 cuft Drainage Area = 0.278 ac Curve Number = 88.03* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 3.29 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.231 98.00 Impervious 0.047 39.00 Landscape 0.278 88.03 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.55 0.6 0.65 0.7 0.75 0.8 0.85 0.9 0.95 1 Qp = 0.690 cfs 30
Page 114
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-102 ROOF Hyd. No. 8 Hydrograph Type = NRCS Runoff Peak Flow = 0.498 cfs Storm Frequency = 2-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 1,550 cuft Drainage Area = 0.213 ac Curve Number = 86.37* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 3.29 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.171 98.00 Impervious 0.042 39.00 Landscape 0.213 86.37 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.04 0.08 0.12 0.16 0.2 0.24 0.28 0.32 0.36 0.4 0.44 0.48 Qp = 0.498 cfs 31
Page 115
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-100 Hyd. No. 9 Hydrograph Type = Junction Peak Flow = 1.188 cfs Storm Frequency = 2-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 3,715 cuft Inflow Hydrographs = 7, 8 Total Contrib. Area = 0.491 ac PR-101 PR-102 ROOF PR-100 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.188 cfs 32
Page 116
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-102 ROOF INF Hyd. No. 10 Hydrograph Type = Pond Route Peak Flow = 0.000 cfs Storm Frequency = 2-yr Time to Peak = 17.57 hrs Time Interval = 1 min Hydrograph Volume = 0.000 cuft Inflow Hydrograph = 8 - PR-102 ROOF Max. Elevation = 193.89 ft Pond Name = F-ROOF INF-100 Max. Storage = 484 cuft Pond Routing by Storage Indication Method PR-102 ROOF PR-102 ROOF INF Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 0 0.02 0.04 0.06 0.08 0.1 0.12 0.14 0.16 0.18 0.2 0.22 0.24 0.26 0.28 0.3 0.32 0.34 0.36 0.38 0.4 0.42 0.44 0.46 0.48 0.5 Qp = 0.000 cfs 33
Page 117
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-200 (SYSTEM #1) Hyd. No. 11 Hydrograph Type = NRCS Runoff Peak Flow = 0.674 cfs Storm Frequency = 2-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 2,092 cuft Drainage Area = 0.405 ac Curve Number = 78.62* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 3.29 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.272 98.00 Impervious 0.133 39.00 Landscape 0.405 78.62 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.55 0.6 0.65 0.7 0.75 0.8 0.85 0.9 0.95 1 Qp = 0.674 cfs 34
Page 118
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-300 Hyd. No. 12 Hydrograph Type = NRCS Runoff Peak Flow = 0.397 cfs Storm Frequency = 2-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 1,233 cuft Drainage Area = 0.177 ac Curve Number = 85.33* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 3.29 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.139 98.00 Impervious 0.038 39.00 Landscape 0.177 85.33 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.02 0.04 0.06 0.08 0.1 0.12 0.14 0.16 0.18 0.2 0.22 0.24 0.26 0.28 0.3 0.32 0.34 0.36 0.38 0.4 Qp = 0.397 cfs 35
Page 119
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-SYSTEM #3 Hyd. No. 13 Hydrograph Type = Junction Peak Flow = 1.585 cfs Storm Frequency = 2-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 4,948 cuft Inflow Hydrographs = 12 Total Contrib. Area = 0.177 ac PR-100 PR-300 PR-SYSTEM #3 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.585 cfs 36
Page 120
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-200 STC 900 Hyd. No. 14 Hydrograph Type = Rational Peak Flow = 4.096 cfs Storm Frequency = 2-yr Time to Peak = 0.08 hrs Time Interval = 1 min Runoff Volume = 1,843 cuft Drainage Area = 1.14 ac Runoff Coeff. = 0.72* Tc Method = User Time of Conc. (Tc) = 5.0 min IDF Curve = 20260625DORSET LOT F NOAA IDF.idf Intensity = 4.99 in/hr Freq. Corr. Factor = 1.00 Asc/Rec Limb Factors = 1/2 * Composite C Worksheet AREA (ac) C DESCRIPTION 0.792 0.90 Impervious 0.348 0.30 Landscape 1.14 0.72 Time (min) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 0 1 2 3 4 5 Qp = 4.096 cfs 37
Page 121
Design Storm Report Custom Storm filename: Hydrology Studio v 3.0.0.44 06-29-2026 Storm Distribution: NOAA-D, 24-hr Total Rainfall Volume (in)Storm Duration 1-yr ✔ 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 24 hrs 2.62 3.29 0.00 4.39 5.30 6.56 7.47 8.49 Incremental Rainfall Distribution, 2-yr Time Time Time Time TimePrecip Precip Precip Precip Precip (hrs) (hrs) (hrs) (hrs) (hrs)(in) (in) (in) (in) (in) 11.60 0.009925 11.62 0.010446 11.63 0.010446 11.65 0.010446 11.67 0.010445 11.68 0.010446 11.70 0.010445 11.72 0.014328 11.73 0.014328 11.75 0.014328 11.77 0.014328 11.78 0.014328 11.80 0.014329 11.82 0.019882 11.83 0.019883 11.85 0.019882 11.87 0.019882 11.88 0.019883 11.90 0.019882 11.92 0.034299 11.93 0.034297 11.95 0.034299 11.97 0.034297 11.98 0.034299 12.00 0.034297 12.02 0.057228 12.03 0.057231 12.05 0.057228 12.07 0.057231 12.08 0.057228 12.10 0.057231 12.12 0.019882 12.13 0.019883 12.15 0.019882 12.17 0.019882 12.18 0.019883 12.20 0.019882 12.22 0.014328 12.23 0.014328 12.25 0.014328 12.27 0.014328 12.28 0.014328 12.30 0.014327 12.32 0.010445 12.33 0.010446 12.35 0.010445 12.37 0.010446 12.38 0.010445 12.40 0.010447 12.42 0.009924 12.43 0.009925 12.45 0.009925 12.47 0.009925 12.48 0.009925 12.50 0.009925 Time (hrs) 0 2 4 6 8 10 12 14 16 18 20 22 24 0 1 2 3 4 0 1 2 3 4 38
Page 122
Hydrograph 5-yr Summary Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 Hyd. No. Hydrograph Type Hydrograph Name Peak Flow (cfs) Time to Peak (hrs) Hydrograph Volume (cuft) Inflow Hyd(s) Maximum Elevation (ft) Maximum Storage (cuft) 1 NRCS Runoff EX-101 0.611 12.12 1,910 ---- 2 NRCS Runoff EX-102 ROOF 1.323 12.12 4,790 ---- 3 Junction EX-100 1.935 12.12 6,699 1, 2 4 NRCS Runoff EX-200 (SYSTEM #1) 1.248 12.12 3,885 ---- 5 NRCS Runoff EX-300 0.564 12.12 1,761 ---- 6 Junction EX-SYSTEM #3 2.499 12.12 8,460 3, 5 7 NRCS Runoff PR-101 1.008 12.12 3,222 ---- 8 NRCS Runoff PR-102 ROOF 0.740 12.12 2,342 ---- 9 Junction PR-100 1.749 12.12 5,563 7, 8 10 Pond Route PR-102 ROOF INF 0.000 20.78 0.000 8 194.43 892 11 NRCS Runoff PR-200 (SYSTEM #1) 1.105 12.12 3,416 ---- 12 NRCS Runoff PR-300 0.598 12.12 1,881 ---- 13 Junction PR-SYSTEM #3 2.347 12.12 7,445 9, 12 14 Rational PR-200 STC 900 5.204 0.08 2,342 ---- 39
Page 123
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-101 Hyd. No. 1 Hydrograph Type = NRCS Runoff Peak Flow = 0.611 cfs Storm Frequency = 5-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 1,910 cuft Drainage Area = 0.191 ac Curve Number = 83.48* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 4.39 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.144 98.00 Impervious 0.047 39.00 Landscape 0.191 83.48 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.55 0.6 0.65 0.7 0.75 0.8 0.85 0.9 0.95 1 Qp = 0.611 cfs 40
Page 124
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-102 ROOF Hyd. No. 2 Hydrograph Type = NRCS Runoff Peak Flow = 1.323 cfs Storm Frequency = 5-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 4,790 cuft Drainage Area = 0.308 ac Curve Number = 98.00* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 4.39 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.308 98.00 Impervious 0.308 98.00 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.323 cfs 41
Page 125
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-100 Hyd. No. 3 Hydrograph Type = Junction Peak Flow = 1.935 cfs Storm Frequency = 5-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 6,699 cuft Inflow Hydrographs = 1, 2 Total Contrib. Area = 0.499 ac EX-101 EX-102 ROOF EX-100 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.935 cfs 42
Page 126
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-200 (SYSTEM #1) Hyd. No. 4 Hydrograph Type = NRCS Runoff Peak Flow = 1.248 cfs Storm Frequency = 5-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 3,885 cuft Drainage Area = 0.401 ac Curve Number = 82.55* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 4.39 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.296 98.00 Impervious 0.105 39.00 Landscape 0.401 82.55 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.248 cfs 43
Page 127
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-300 Hyd. No. 5 Hydrograph Type = NRCS Runoff Peak Flow = 0.564 cfs Storm Frequency = 5-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 1,761 cuft Drainage Area = 0.177 ac Curve Number = 83.33* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 4.39 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.133 98.00 Impervious 0.044 39.00 Landscape 0.177 83.33 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.55 0.6 0.65 0.7 0.75 0.8 0.85 0.9 0.95 1 Qp = 0.564 cfs 44
Page 128
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-SYSTEM #3 Hyd. No. 6 Hydrograph Type = Junction Peak Flow = 2.499 cfs Storm Frequency = 5-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 8,460 cuft Inflow Hydrographs = 5 Total Contrib. Area = 0.177 ac EX-100 EX-300 EX-SYSTEM #3 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 Qp = 2.499 cfs 45
Page 129
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-101 Hyd. No. 7 Hydrograph Type = NRCS Runoff Peak Flow = 1.008 cfs Storm Frequency = 5-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 3,222 cuft Drainage Area = 0.278 ac Curve Number = 88.03* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 4.39 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.231 98.00 Impervious 0.047 39.00 Landscape 0.278 88.03 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.008 cfs 46
Page 130
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-102 ROOF Hyd. No. 8 Hydrograph Type = NRCS Runoff Peak Flow = 0.740 cfs Storm Frequency = 5-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 2,342 cuft Drainage Area = 0.213 ac Curve Number = 86.37* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 4.39 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.171 98.00 Impervious 0.042 39.00 Landscape 0.213 86.37 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.55 0.6 0.65 0.7 0.75 0.8 0.85 0.9 0.95 1 Qp = 0.740 cfs 47
Page 131
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-100 Hyd. No. 9 Hydrograph Type = Junction Peak Flow = 1.749 cfs Storm Frequency = 5-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 5,563 cuft Inflow Hydrographs = 7, 8 Total Contrib. Area = 0.491 ac PR-101 PR-102 ROOF PR-100 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.749 cfs 48
Page 132
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-102 ROOF INF Hyd. No. 10 Hydrograph Type = Pond Route Peak Flow = 0.000 cfs Storm Frequency = 5-yr Time to Peak = 20.78 hrs Time Interval = 1 min Hydrograph Volume = 0.000 cuft Inflow Hydrograph = 8 - PR-102 ROOF Max. Elevation = 194.43 ft Pond Name = F-ROOF INF-100 Max. Storage = 892 cuft Pond Routing by Storage Indication Method PR-102 ROOF PR-102 ROOF INF Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.55 0.6 0.65 0.7 0.75 0.8 0.85 0.9 0.95 1 Qp = 0.000 cfs 49
Page 133
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-200 (SYSTEM #1) Hyd. No. 11 Hydrograph Type = NRCS Runoff Peak Flow = 1.105 cfs Storm Frequency = 5-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 3,416 cuft Drainage Area = 0.405 ac Curve Number = 78.62* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 4.39 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.272 98.00 Impervious 0.133 39.00 Landscape 0.405 78.62 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.105 cfs 50
Page 134
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-300 Hyd. No. 12 Hydrograph Type = NRCS Runoff Peak Flow = 0.598 cfs Storm Frequency = 5-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 1,881 cuft Drainage Area = 0.177 ac Curve Number = 85.33* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 4.39 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.139 98.00 Impervious 0.038 39.00 Landscape 0.177 85.33 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.55 0.6 0.65 0.7 0.75 0.8 0.85 0.9 0.95 1 Qp = 0.598 cfs 51
Page 135
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-SYSTEM #3 Hyd. No. 13 Hydrograph Type = Junction Peak Flow = 2.347 cfs Storm Frequency = 5-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 7,445 cuft Inflow Hydrographs = 12 Total Contrib. Area = 0.177 ac PR-100 PR-300 PR-SYSTEM #3 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 Qp = 2.347 cfs 52
Page 136
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-200 STC 900 Hyd. No. 14 Hydrograph Type = Rational Peak Flow = 5.204 cfs Storm Frequency = 5-yr Time to Peak = 0.08 hrs Time Interval = 1 min Runoff Volume = 2,342 cuft Drainage Area = 1.14 ac Runoff Coeff. = 0.72* Tc Method = User Time of Conc. (Tc) = 5.0 min IDF Curve = 20260625DORSET LOT F NOAA IDF.idf Intensity = 6.34 in/hr Freq. Corr. Factor = 1.00 Asc/Rec Limb Factors = 1/2 * Composite C Worksheet AREA (ac) C DESCRIPTION 0.792 0.90 Impervious 0.348 0.30 Landscape 1.14 0.72 Time (min) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 0 1 2 3 4 5 6 Qp = 5.204 cfs 53
Page 137
Design Storm Report Custom Storm filename: Hydrology Studio v 3.0.0.44 06-29-2026 Storm Distribution: NOAA-D, 24-hr Total Rainfall Volume (in)Storm Duration 1-yr 2-yr 3-yr ✔ 5-yr 10-yr 25-yr 50-yr 100-yr 24 hrs 2.62 3.29 0.00 4.39 5.30 6.56 7.47 8.49 Incremental Rainfall Distribution, 5-yr Time Time Time Time TimePrecip Precip Precip Precip Precip (hrs) (hrs) (hrs) (hrs) (hrs)(in) (in) (in) (in) (in) 11.60 0.013243 11.62 0.013939 11.63 0.013938 11.65 0.013939 11.67 0.013938 11.68 0.013939 11.70 0.013938 11.72 0.019118 11.73 0.019119 11.75 0.019118 11.77 0.019119 11.78 0.019118 11.80 0.019120 11.82 0.026530 11.83 0.026531 11.85 0.026530 11.87 0.026530 11.88 0.026531 11.90 0.026530 11.92 0.045767 11.93 0.045765 11.95 0.045767 11.97 0.045765 11.98 0.045767 12.00 0.045764 12.02 0.076362 12.03 0.076366 12.05 0.076362 12.07 0.076366 12.08 0.076362 12.10 0.076366 12.12 0.026530 12.13 0.026531 12.15 0.026530 12.17 0.026530 12.18 0.026531 12.20 0.026530 12.22 0.019119 12.23 0.019118 12.25 0.019119 12.27 0.019118 12.28 0.019119 12.30 0.019118 12.32 0.013938 12.33 0.013939 12.35 0.013938 12.37 0.013939 12.38 0.013938 12.40 0.013939 12.42 0.013243 12.43 0.013244 12.45 0.013243 12.47 0.013243 12.48 0.013244 12.50 0.013243 Time (hrs) 0 2 4 6 8 10 12 14 16 18 20 22 24 0 1 2 3 4 5 0 1 2 3 4 5 54
Page 138
Hydrograph 10-yr Summary Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 Hyd. No. Hydrograph Type Hydrograph Name Peak Flow (cfs) Time to Peak (hrs) Hydrograph Volume (cuft) Inflow Hyd(s) Maximum Elevation (ft) Maximum Storage (cuft) 1 NRCS Runoff EX-101 0.792 12.12 2,498 ---- 2 NRCS Runoff EX-102 ROOF 1.601 12.12 5,837 ---- 3 Junction EX-100 2.392 12.12 8,336 1, 2 4 NRCS Runoff EX-200 (SYSTEM #1) 1.625 12.12 5,108 ---- 5 NRCS Runoff EX-300 0.731 12.12 2,305 ---- 6 Junction EX-SYSTEM #3 3.123 12.12 10,641 3, 5 7 NRCS Runoff PR-101 1.272 12.12 4,119 ---- 8 NRCS Runoff PR-102 ROOF 0.942 12.12 3,019 ---- 9 Junction PR-100 2.214 12.12 7,137 7, 8 10 Pond Route PR-102 ROOF INF 0.000 5.25 0.000 8 194.93 1,272 11 NRCS Runoff PR-200 (SYSTEM #1) 1.477 12.12 4,588 ---- 12 NRCS Runoff PR-300 0.766 12.12 2,438 ---- 13 Junction PR-SYSTEM #3 2.979 12.12 9,575 9, 12 14 Rational PR-200 STC 900 6.107 0.08 2,748 ---- 55
Page 139
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-101 Hyd. No. 1 Hydrograph Type = NRCS Runoff Peak Flow = 0.792 cfs Storm Frequency = 10-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 2,498 cuft Drainage Area = 0.191 ac Curve Number = 83.48* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 5.30 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.144 98.00 Impervious 0.047 39.00 Landscape 0.191 83.48 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.55 0.6 0.65 0.7 0.75 0.8 0.85 0.9 0.95 1 Qp = 0.792 cfs 56
Page 140
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-102 ROOF Hyd. No. 2 Hydrograph Type = NRCS Runoff Peak Flow = 1.601 cfs Storm Frequency = 10-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 5,837 cuft Drainage Area = 0.308 ac Curve Number = 98.00* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 5.30 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.308 98.00 Impervious 0.308 98.00 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.601 cfs 57
Page 141
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-100 Hyd. No. 3 Hydrograph Type = Junction Peak Flow = 2.392 cfs Storm Frequency = 10-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 8,336 cuft Inflow Hydrographs = 1, 2 Total Contrib. Area = 0.499 ac EX-101 EX-102 ROOF EX-100 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 Qp = 2.392 cfs 58
Page 142
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-200 (SYSTEM #1) Hyd. No. 4 Hydrograph Type = NRCS Runoff Peak Flow = 1.625 cfs Storm Frequency = 10-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 5,108 cuft Drainage Area = 0.401 ac Curve Number = 82.55* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 5.30 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.296 98.00 Impervious 0.105 39.00 Landscape 0.401 82.55 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.625 cfs 59
Page 143
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-300 Hyd. No. 5 Hydrograph Type = NRCS Runoff Peak Flow = 0.731 cfs Storm Frequency = 10-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 2,305 cuft Drainage Area = 0.177 ac Curve Number = 83.33* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 5.30 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.133 98.00 Impervious 0.044 39.00 Landscape 0.177 83.33 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.55 0.6 0.65 0.7 0.75 0.8 0.85 0.9 0.95 1 Qp = 0.731 cfs 60
Page 144
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-SYSTEM #3 Hyd. No. 6 Hydrograph Type = Junction Peak Flow = 3.123 cfs Storm Frequency = 10-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 10,641 cuft Inflow Hydrographs = 5 Total Contrib. Area = 0.177 ac EX-100 EX-300 EX-SYSTEM #3 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 4 Qp = 3.123 cfs 61
Page 145
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-101 Hyd. No. 7 Hydrograph Type = NRCS Runoff Peak Flow = 1.272 cfs Storm Frequency = 10-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 4,119 cuft Drainage Area = 0.278 ac Curve Number = 88.03* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 5.30 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.231 98.00 Impervious 0.047 39.00 Landscape 0.278 88.03 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.272 cfs 62
Page 146
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-102 ROOF Hyd. No. 8 Hydrograph Type = NRCS Runoff Peak Flow = 0.942 cfs Storm Frequency = 10-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 3,019 cuft Drainage Area = 0.213 ac Curve Number = 86.37* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 5.30 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.171 98.00 Impervious 0.042 39.00 Landscape 0.213 86.37 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.55 0.6 0.65 0.7 0.75 0.8 0.85 0.9 0.95 1 Qp = 0.942 cfs 63
Page 147
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-100 Hyd. No. 9 Hydrograph Type = Junction Peak Flow = 2.214 cfs Storm Frequency = 10-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 7,137 cuft Inflow Hydrographs = 7, 8 Total Contrib. Area = 0.491 ac PR-101 PR-102 ROOF PR-100 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 Qp = 2.214 cfs 64
Page 148
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-102 ROOF INF Hyd. No. 10 Hydrograph Type = Pond Route Peak Flow = 0.000 cfs Storm Frequency = 10-yr Time to Peak = 5.25 hrs Time Interval = 1 min Hydrograph Volume = 0.000 cuft Inflow Hydrograph = 8 - PR-102 ROOF Max. Elevation = 194.93 ft Pond Name = F-ROOF INF-100 Max. Storage = 1,272 cuft Pond Routing by Storage Indication Method PR-102 ROOF PR-102 ROOF INF Time (hrs) 0 1 2 3 4 5 6 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.55 0.6 0.65 0.7 0.75 0.8 0.85 0.9 0.95 1 Qp = 0.000 cfs 65
Page 149
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-200 (SYSTEM #1) Hyd. No. 11 Hydrograph Type = NRCS Runoff Peak Flow = 1.477 cfs Storm Frequency = 10-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 4,588 cuft Drainage Area = 0.405 ac Curve Number = 78.62* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 5.30 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.272 98.00 Impervious 0.133 39.00 Landscape 0.405 78.62 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.477 cfs 66
Page 150
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-300 Hyd. No. 12 Hydrograph Type = NRCS Runoff Peak Flow = 0.766 cfs Storm Frequency = 10-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 2,438 cuft Drainage Area = 0.177 ac Curve Number = 85.33* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 5.30 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.139 98.00 Impervious 0.038 39.00 Landscape 0.177 85.33 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.55 0.6 0.65 0.7 0.75 0.8 0.85 0.9 0.95 1 Qp = 0.766 cfs 67
Page 151
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-SYSTEM #3 Hyd. No. 13 Hydrograph Type = Junction Peak Flow = 2.979 cfs Storm Frequency = 10-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 9,575 cuft Inflow Hydrographs = 12 Total Contrib. Area = 0.177 ac PR-100 PR-300 PR-SYSTEM #3 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 Qp = 2.979 cfs 68
Page 152
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-200 STC 900 Hyd. No. 14 Hydrograph Type = Rational Peak Flow = 6.107 cfs Storm Frequency = 10-yr Time to Peak = 0.08 hrs Time Interval = 1 min Runoff Volume = 2,748 cuft Drainage Area = 1.14 ac Runoff Coeff. = 0.72* Tc Method = User Time of Conc. (Tc) = 5.0 min IDF Curve = 20260625DORSET LOT F NOAA IDF.idf Intensity = 7.44 in/hr Freq. Corr. Factor = 1.00 Asc/Rec Limb Factors = 1/2 * Composite C Worksheet AREA (ac) C DESCRIPTION 0.792 0.90 Impervious 0.348 0.30 Landscape 1.14 0.72 Time (min) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 0 1 2 3 4 5 6 7 Qp = 6.107 cfs 69
Page 153
Design Storm Report Custom Storm filename: Hydrology Studio v 3.0.0.44 06-29-2026 Storm Distribution: NOAA-D, 24-hr Total Rainfall Volume (in)Storm Duration 1-yr 2-yr 3-yr 5-yr ✔ 10-yr 25-yr 50-yr 100-yr 24 hrs 2.62 3.29 0.00 4.39 5.30 6.56 7.47 8.49 Incremental Rainfall Distribution, 10-yr Time Time Time Time TimePrecip Precip Precip Precip Precip (hrs) (hrs) (hrs) (hrs) (hrs)(in) (in) (in) (in) (in) 11.60 0.015988 11.62 0.016828 11.63 0.016827 11.65 0.016828 11.67 0.016827 11.68 0.016828 11.70 0.016827 11.72 0.023081 11.73 0.023082 11.75 0.023081 11.77 0.023082 11.78 0.023081 11.80 0.023084 11.82 0.032029 11.83 0.032031 11.85 0.032029 11.87 0.032029 11.88 0.032031 11.90 0.032029 11.92 0.055254 11.93 0.055251 11.95 0.055254 11.97 0.055251 11.98 0.055254 12.00 0.055250 12.02 0.092191 12.03 0.092196 12.05 0.092191 12.07 0.092196 12.08 0.092191 12.10 0.092196 12.12 0.032029 12.13 0.032031 12.15 0.032029 12.17 0.032029 12.18 0.032031 12.20 0.032029 12.22 0.023082 12.23 0.023081 12.25 0.023082 12.27 0.023081 12.28 0.023082 12.30 0.023080 12.32 0.016827 12.33 0.016828 12.35 0.016827 12.37 0.016828 12.38 0.016827 12.40 0.016829 12.42 0.015988 12.43 0.015989 12.45 0.015988 12.47 0.015988 12.48 0.015989 12.50 0.015988 Time (hrs) 0 2 4 6 8 10 12 14 16 18 20 22 24 0 1 2 3 4 5 6 0 1 2 3 4 5 6 70
Page 154
Hydrograph 25-yr Summary Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 Hyd. No. Hydrograph Type Hydrograph Name Peak Flow (cfs) Time to Peak (hrs) Hydrograph Volume (cuft) Inflow Hyd(s) Maximum Elevation (ft) Maximum Storage (cuft) 1 NRCS Runoff EX-101 1.042 12.12 3,336 ---- 2 NRCS Runoff EX-102 ROOF 1.984 12.12 7,288 ---- 3 Junction EX-100 3.027 12.12 10,625 1, 2 4 NRCS Runoff EX-200 (SYSTEM #1) 2.151 12.12 6,852 ---- 5 NRCS Runoff EX-300 0.963 12.12 3,081 ---- 6 Junction EX-SYSTEM #3 3.990 12.12 13,706 3, 5 7 NRCS Runoff PR-101 1.634 12.12 5,380 ---- 8 NRCS Runoff PR-102 ROOF 1.221 12.12 3,975 ---- 9 Junction PR-100 2.855 12.12 9,355 7, 8 10 Pond Route PR-102 ROOF INF 0.000 9.10 0.000 8 195.71 1,837 11 NRCS Runoff PR-200 (SYSTEM #1) 2.003 12.12 6,282 ---- 12 NRCS Runoff PR-300 0.998 12.12 3,226 ---- 13 Junction PR-SYSTEM #3 3.853 12.12 12,581 9, 12 14 Rational PR-200 STC 900 8.108 0.08 3,649 ---- 71
Page 155
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-101 Hyd. No. 1 Hydrograph Type = NRCS Runoff Peak Flow = 1.042 cfs Storm Frequency = 25-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 3,336 cuft Drainage Area = 0.191 ac Curve Number = 83.48* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 6.56 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.144 98.00 Impervious 0.047 39.00 Landscape 0.191 83.48 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.042 cfs 72
Page 156
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-102 ROOF Hyd. No. 2 Hydrograph Type = NRCS Runoff Peak Flow = 1.984 cfs Storm Frequency = 25-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 7,288 cuft Drainage Area = 0.308 ac Curve Number = 98.00* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 6.56 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.308 98.00 Impervious 0.308 98.00 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.984 cfs 73
Page 157
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-100 Hyd. No. 3 Hydrograph Type = Junction Peak Flow = 3.027 cfs Storm Frequency = 25-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 10,625 cuft Inflow Hydrographs = 1, 2 Total Contrib. Area = 0.499 ac EX-101 EX-102 ROOF EX-100 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 4 Qp = 3.027 cfs 74
Page 158
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-200 (SYSTEM #1) Hyd. No. 4 Hydrograph Type = NRCS Runoff Peak Flow = 2.151 cfs Storm Frequency = 25-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 6,852 cuft Drainage Area = 0.401 ac Curve Number = 82.55* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 6.56 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.296 98.00 Impervious 0.105 39.00 Landscape 0.401 82.55 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 Qp = 2.151 cfs 75
Page 159
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-300 Hyd. No. 5 Hydrograph Type = NRCS Runoff Peak Flow = 0.963 cfs Storm Frequency = 25-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 3,081 cuft Drainage Area = 0.177 ac Curve Number = 83.33* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 6.56 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.133 98.00 Impervious 0.044 39.00 Landscape 0.177 83.33 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.55 0.6 0.65 0.7 0.75 0.8 0.85 0.9 0.95 1 Qp = 0.963 cfs 76
Page 160
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-SYSTEM #3 Hyd. No. 6 Hydrograph Type = Junction Peak Flow = 3.990 cfs Storm Frequency = 25-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 13,706 cuft Inflow Hydrographs = 5 Total Contrib. Area = 0.177 ac EX-100 EX-300 EX-SYSTEM #3 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 4 Qp = 3.990 cfs 77
Page 161
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-101 Hyd. No. 7 Hydrograph Type = NRCS Runoff Peak Flow = 1.634 cfs Storm Frequency = 25-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 5,380 cuft Drainage Area = 0.278 ac Curve Number = 88.03* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 6.56 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.231 98.00 Impervious 0.047 39.00 Landscape 0.278 88.03 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.634 cfs 78
Page 162
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-102 ROOF Hyd. No. 8 Hydrograph Type = NRCS Runoff Peak Flow = 1.221 cfs Storm Frequency = 25-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 3,975 cuft Drainage Area = 0.213 ac Curve Number = 86.37* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 6.56 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.171 98.00 Impervious 0.042 39.00 Landscape 0.213 86.37 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.221 cfs 79
Page 163
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-100 Hyd. No. 9 Hydrograph Type = Junction Peak Flow = 2.855 cfs Storm Frequency = 25-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 9,355 cuft Inflow Hydrographs = 7, 8 Total Contrib. Area = 0.491 ac PR-101 PR-102 ROOF PR-100 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 Qp = 2.855 cfs 80
Page 164
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-102 ROOF INF Hyd. No. 10 Hydrograph Type = Pond Route Peak Flow = 0.000 cfs Storm Frequency = 25-yr Time to Peak = 9.10 hrs Time Interval = 1 min Hydrograph Volume = 0.000 cuft Inflow Hydrograph = 8 - PR-102 ROOF Max. Elevation = 195.71 ft Pond Name = F-ROOF INF-100 Max. Storage = 1,837 cuft Pond Routing by Storage Indication Method PR-102 ROOF PR-102 ROOF INF Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 0.000 cfs 81
Page 165
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-200 (SYSTEM #1) Hyd. No. 11 Hydrograph Type = NRCS Runoff Peak Flow = 2.003 cfs Storm Frequency = 25-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 6,282 cuft Drainage Area = 0.405 ac Curve Number = 78.62* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 6.56 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.272 98.00 Impervious 0.133 39.00 Landscape 0.405 78.62 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 Qp = 2.003 cfs 82
Page 166
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-300 Hyd. No. 12 Hydrograph Type = NRCS Runoff Peak Flow = 0.998 cfs Storm Frequency = 25-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 3,226 cuft Drainage Area = 0.177 ac Curve Number = 85.33* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 6.56 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.139 98.00 Impervious 0.038 39.00 Landscape 0.177 85.33 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.55 0.6 0.65 0.7 0.75 0.8 0.85 0.9 0.95 1 Qp = 0.998 cfs 83
Page 167
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-SYSTEM #3 Hyd. No. 13 Hydrograph Type = Junction Peak Flow = 3.853 cfs Storm Frequency = 25-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 12,581 cuft Inflow Hydrographs = 12 Total Contrib. Area = 0.177 ac PR-100 PR-300 PR-SYSTEM #3 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 4 Qp = 3.853 cfs 84
Page 168
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-200 STC 900 Hyd. No. 14 Hydrograph Type = Rational Peak Flow = 8.108 cfs Storm Frequency = 25-yr Time to Peak = 0.08 hrs Time Interval = 1 min Runoff Volume = 3,649 cuft Drainage Area = 1.14 ac Runoff Coeff. = 0.72* Tc Method = User Time of Conc. (Tc) = 5.0 min IDF Curve = 20260625DORSET LOT F NOAA IDF.idf Intensity = 8.98 in/hr Freq. Corr. Factor = 1.10 Asc/Rec Limb Factors = 1/2 * Composite C Worksheet AREA (ac) C DESCRIPTION 0.792 0.90 Impervious 0.348 0.30 Landscape 1.14 0.72 Time (min) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 0 1 2 3 4 5 6 7 8 9 Qp = 8.108 cfs 85
Page 169
Design Storm Report Custom Storm filename: Hydrology Studio v 3.0.0.44 06-29-2026 Storm Distribution: NOAA-D, 24-hr Total Rainfall Volume (in)Storm Duration 1-yr 2-yr 3-yr 5-yr 10-yr ✔ 25-yr 50-yr 100-yr 24 hrs 2.62 3.29 0.00 4.39 5.30 6.56 7.47 8.49 Incremental Rainfall Distribution, 25-yr Time Time Time Time TimePrecip Precip Precip Precip Precip (hrs) (hrs) (hrs) (hrs) (hrs)(in) (in) (in) (in) (in) 11.60 0.019789 11.62 0.020828 11.63 0.020828 11.65 0.020829 11.67 0.020827 11.68 0.020829 11.70 0.020827 11.72 0.028568 11.73 0.028570 11.75 0.028568 11.77 0.028570 11.78 0.028568 11.80 0.028571 11.82 0.039643 11.83 0.039645 11.85 0.039644 11.87 0.039643 11.88 0.039645 11.90 0.039644 11.92 0.068389 11.93 0.068386 11.95 0.068390 11.97 0.068386 11.98 0.068390 12.00 0.068385 12.02 0.114108 12.03 0.114115 12.05 0.114109 12.07 0.114115 12.08 0.114108 12.10 0.114115 12.12 0.039643 12.13 0.039646 12.15 0.039643 12.17 0.039644 12.18 0.039645 12.20 0.039643 12.22 0.028569 12.23 0.028568 12.25 0.028570 12.27 0.028568 12.28 0.028570 12.30 0.028567 12.32 0.020827 12.33 0.020829 12.35 0.020827 12.37 0.020829 12.38 0.020827 12.40 0.020829 12.42 0.019789 12.43 0.019790 12.45 0.019789 12.47 0.019789 12.48 0.019790 12.50 0.019789 Time (hrs) 0 2 4 6 8 10 12 14 16 18 20 22 24 0 1 2 3 4 5 6 7 0 1 2 3 4 5 6 7 86
Page 170
Hydrograph 50-yr Summary Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 Hyd. No. Hydrograph Type Hydrograph Name Peak Flow (cfs) Time to Peak (hrs) Hydrograph Volume (cuft) Inflow Hyd(s) Maximum Elevation (ft) Maximum Storage (cuft) 1 NRCS Runoff EX-101 1.223 12.12 3,952 ---- 2 NRCS Runoff EX-102 ROOF 2.261 12.12 8,337 ---- 3 Junction EX-100 3.485 12.12 12,289 1, 2 4 NRCS Runoff EX-200 (SYSTEM #1) 2.531 12.12 8,138 ---- 5 NRCS Runoff EX-300 1.131 12.12 3,651 ---- 6 Junction EX-SYSTEM #3 4.615 12.12 15,940 3, 5 7 NRCS Runoff PR-101 1.894 12.12 6,301 ---- 8 NRCS Runoff PR-102 ROOF 1.422 12.12 4,674 ---- 9 Junction PR-100 3.316 12.12 10,974 7, 8 10 Pond Route PR-102 ROOF INF 0.000 6.12 0.000 8 196.34 2,270 11 NRCS Runoff PR-200 (SYSTEM #1) 2.386 12.12 7,540 ---- 12 NRCS Runoff PR-300 1.165 12.12 3,804 ---- 13 Junction PR-SYSTEM #3 4.481 12.12 14,778 9, 12 14 Rational PR-200 STC 900 9.948 0.08 4,477 ---- 87
Page 171
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-101 Hyd. No. 1 Hydrograph Type = NRCS Runoff Peak Flow = 1.223 cfs Storm Frequency = 50-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 3,952 cuft Drainage Area = 0.191 ac Curve Number = 83.48* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 7.47 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.144 98.00 Impervious 0.047 39.00 Landscape 0.191 83.48 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.223 cfs 88
Page 172
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-102 ROOF Hyd. No. 2 Hydrograph Type = NRCS Runoff Peak Flow = 2.261 cfs Storm Frequency = 50-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 8,337 cuft Drainage Area = 0.308 ac Curve Number = 98.00* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 7.47 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.308 98.00 Impervious 0.308 98.00 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 Qp = 2.261 cfs 89
Page 173
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-100 Hyd. No. 3 Hydrograph Type = Junction Peak Flow = 3.485 cfs Storm Frequency = 50-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 12,289 cuft Inflow Hydrographs = 1, 2 Total Contrib. Area = 0.499 ac EX-101 EX-102 ROOF EX-100 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 4 Qp = 3.485 cfs 90
Page 174
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-200 (SYSTEM #1) Hyd. No. 4 Hydrograph Type = NRCS Runoff Peak Flow = 2.531 cfs Storm Frequency = 50-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 8,138 cuft Drainage Area = 0.401 ac Curve Number = 82.55* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 7.47 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.296 98.00 Impervious 0.105 39.00 Landscape 0.401 82.55 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 Qp = 2.531 cfs 91
Page 175
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-300 Hyd. No. 5 Hydrograph Type = NRCS Runoff Peak Flow = 1.131 cfs Storm Frequency = 50-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 3,651 cuft Drainage Area = 0.177 ac Curve Number = 83.33* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 7.47 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.133 98.00 Impervious 0.044 39.00 Landscape 0.177 83.33 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.131 cfs 92
Page 176
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-SYSTEM #3 Hyd. No. 6 Hydrograph Type = Junction Peak Flow = 4.615 cfs Storm Frequency = 50-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 15,940 cuft Inflow Hydrographs = 5 Total Contrib. Area = 0.177 ac EX-100 EX-300 EX-SYSTEM #3 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 4 5 Qp = 4.615 cfs 93
Page 177
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-101 Hyd. No. 7 Hydrograph Type = NRCS Runoff Peak Flow = 1.894 cfs Storm Frequency = 50-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 6,301 cuft Drainage Area = 0.278 ac Curve Number = 88.03* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 7.47 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.231 98.00 Impervious 0.047 39.00 Landscape 0.278 88.03 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.894 cfs 94
Page 178
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-102 ROOF Hyd. No. 8 Hydrograph Type = NRCS Runoff Peak Flow = 1.422 cfs Storm Frequency = 50-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 4,674 cuft Drainage Area = 0.213 ac Curve Number = 86.37* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 7.47 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.171 98.00 Impervious 0.042 39.00 Landscape 0.213 86.37 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.422 cfs 95
Page 179
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-100 Hyd. No. 9 Hydrograph Type = Junction Peak Flow = 3.316 cfs Storm Frequency = 50-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 10,974 cuft Inflow Hydrographs = 7, 8 Total Contrib. Area = 0.491 ac PR-101 PR-102 ROOF PR-100 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 4 Qp = 3.316 cfs 96
Page 180
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-102 ROOF INF Hyd. No. 10 Hydrograph Type = Pond Route Peak Flow = 0.000 cfs Storm Frequency = 50-yr Time to Peak = 6.12 hrs Time Interval = 1 min Hydrograph Volume = 0.000 cuft Inflow Hydrograph = 8 - PR-102 ROOF Max. Elevation = 196.34 ft Pond Name = F-ROOF INF-100 Max. Storage = 2,270 cuft Pond Routing by Storage Indication Method PR-102 ROOF PR-102 ROOF INF Time (hrs) 0 1 2 3 4 5 6 7 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 0.000 cfs 97
Page 181
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-200 (SYSTEM #1) Hyd. No. 11 Hydrograph Type = NRCS Runoff Peak Flow = 2.386 cfs Storm Frequency = 50-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 7,540 cuft Drainage Area = 0.405 ac Curve Number = 78.62* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 7.47 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.272 98.00 Impervious 0.133 39.00 Landscape 0.405 78.62 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 Qp = 2.386 cfs 98
Page 182
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-300 Hyd. No. 12 Hydrograph Type = NRCS Runoff Peak Flow = 1.165 cfs Storm Frequency = 50-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 3,804 cuft Drainage Area = 0.177 ac Curve Number = 85.33* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 7.47 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.139 98.00 Impervious 0.038 39.00 Landscape 0.177 85.33 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.165 cfs 99
Page 183
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-SYSTEM #3 Hyd. No. 13 Hydrograph Type = Junction Peak Flow = 4.481 cfs Storm Frequency = 50-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 14,778 cuft Inflow Hydrographs = 12 Total Contrib. Area = 0.177 ac PR-100 PR-300 PR-SYSTEM #3 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 4 5 Qp = 4.481 cfs 100
Page 184
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-200 STC 900 Hyd. No. 14 Hydrograph Type = Rational Peak Flow = 9.948 cfs Storm Frequency = 50-yr Time to Peak = 0.08 hrs Time Interval = 1 min Runoff Volume = 4,477 cuft Drainage Area = 1.14 ac Runoff Coeff. = 0.72* Tc Method = User Time of Conc. (Tc) = 5.0 min IDF Curve = 20260625DORSET LOT F NOAA IDF.idf Intensity = 10.10 in/hr Freq. Corr. Factor = 1.20 Asc/Rec Limb Factors = 1/2 * Composite C Worksheet AREA (ac) C DESCRIPTION 0.792 0.90 Impervious 0.348 0.30 Landscape 1.14 0.72 Time (min) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 0 1 2 3 4 5 6 7 8 9 10 11 Qp = 9.948 cfs 101
Page 185
Design Storm Report Custom Storm filename: Hydrology Studio v 3.0.0.44 06-29-2026 Storm Distribution: NOAA-D, 24-hr Total Rainfall Volume (in)Storm Duration 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr ✔ 50-yr 100-yr 24 hrs 2.62 3.29 0.00 4.39 5.30 6.56 7.47 8.49 Incremental Rainfall Distribution, 50-yr Time Time Time Time TimePrecip Precip Precip Precip Precip (hrs) (hrs) (hrs) (hrs) (hrs)(in) (in) (in) (in) (in) 11.60 0.022534 11.62 0.023717 11.63 0.023717 11.65 0.023718 11.67 0.023716 11.68 0.023718 11.70 0.023716 11.72 0.032531 11.73 0.032533 11.75 0.032531 11.77 0.032533 11.78 0.032531 11.80 0.032535 11.82 0.045142 11.83 0.045145 11.85 0.045143 11.87 0.045142 11.88 0.045145 11.90 0.045143 11.92 0.077876 11.93 0.077873 11.95 0.077877 11.97 0.077873 11.98 0.077877 12.00 0.077871 12.02 0.129937 12.03 0.129945 12.05 0.129938 12.07 0.129944 12.08 0.129938 12.10 0.129945 12.12 0.045142 12.13 0.045146 12.15 0.045143 12.17 0.045143 12.18 0.045145 12.20 0.045143 12.22 0.032532 12.23 0.032531 12.25 0.032533 12.27 0.032531 12.28 0.032533 12.30 0.032530 12.32 0.023716 12.33 0.023718 12.35 0.023716 12.37 0.023718 12.38 0.023716 12.40 0.023719 12.42 0.022534 12.43 0.022535 12.45 0.022534 12.47 0.022534 12.48 0.022536 12.50 0.022534 Time (hrs) 0 2 4 6 8 10 12 14 16 18 20 22 24 0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8 102
Page 186
Hydrograph 100-yr Summary Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 Hyd. No. Hydrograph Type Hydrograph Name Peak Flow (cfs) Time to Peak (hrs) Hydrograph Volume (cuft) Inflow Hyd(s) Maximum Elevation (ft) Maximum Storage (cuft) 1 NRCS Runoff EX-101 1.425 12.12 4,650 ---- 2 NRCS Runoff EX-102 ROOF 2.571 12.12 9,512 ---- 3 Junction EX-100 3.997 12.12 14,162 1, 2 4 NRCS Runoff EX-200 (SYSTEM #1) 2.956 12.12 9,596 ---- 5 NRCS Runoff EX-300 1.318 12.12 4,298 ---- 6 Junction EX-SYSTEM #3 5.315 12.12 18,460 3, 5 7 NRCS Runoff PR-101 2.185 12.12 7,338 ---- 8 NRCS Runoff PR-102 ROOF 1.645 12.12 5,463 ---- 9 Junction PR-100 3.830 12.12 12,801 7, 8 10 Pond Route PR-102 ROOF INF 0.106 12.98 363 8 196.71 2,500 11 NRCS Runoff PR-200 (SYSTEM #1) 2.816 12.12 8,975 ---- 12 NRCS Runoff PR-300 1.351 12.12 4,457 ---- 13 Junction PR-SYSTEM #3 5.181 12.12 17,258 9, 12 14 Rational PR-200 STC 900 11.59 0.08 5,217 ---- 103
Page 187
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-101 Hyd. No. 1 Hydrograph Type = NRCS Runoff Peak Flow = 1.425 cfs Storm Frequency = 100-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 4,650 cuft Drainage Area = 0.191 ac Curve Number = 83.48* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 8.49 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.144 98.00 Impervious 0.047 39.00 Landscape 0.191 83.48 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.425 cfs 104
Page 188
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-102 ROOF Hyd. No. 2 Hydrograph Type = NRCS Runoff Peak Flow = 2.571 cfs Storm Frequency = 100-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 9,512 cuft Drainage Area = 0.308 ac Curve Number = 98.00* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 8.49 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.308 98.00 Impervious 0.308 98.00 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 Qp = 2.571 cfs 105
Page 189
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-100 Hyd. No. 3 Hydrograph Type = Junction Peak Flow = 3.997 cfs Storm Frequency = 100-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 14,162 cuft Inflow Hydrographs = 1, 2 Total Contrib. Area = 0.499 ac EX-101 EX-102 ROOF EX-100 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 4 Qp = 3.997 cfs 106
Page 190
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-200 (SYSTEM #1) Hyd. No. 4 Hydrograph Type = NRCS Runoff Peak Flow = 2.956 cfs Storm Frequency = 100-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 9,596 cuft Drainage Area = 0.401 ac Curve Number = 82.55* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 8.49 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.296 98.00 Impervious 0.105 39.00 Landscape 0.401 82.55 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 Qp = 2.956 cfs 107
Page 191
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-300 Hyd. No. 5 Hydrograph Type = NRCS Runoff Peak Flow = 1.318 cfs Storm Frequency = 100-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 4,298 cuft Drainage Area = 0.177 ac Curve Number = 83.33* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 8.49 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.133 98.00 Impervious 0.044 39.00 Landscape 0.177 83.33 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.318 cfs 108
Page 192
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 EX-SYSTEM #3 Hyd. No. 6 Hydrograph Type = Junction Peak Flow = 5.315 cfs Storm Frequency = 100-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 18,460 cuft Inflow Hydrographs = 5 Total Contrib. Area = 0.177 ac EX-100 EX-300 EX-SYSTEM #3 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 4 5 6 Qp = 5.315 cfs 109
Page 193
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-101 Hyd. No. 7 Hydrograph Type = NRCS Runoff Peak Flow = 2.185 cfs Storm Frequency = 100-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 7,338 cuft Drainage Area = 0.278 ac Curve Number = 88.03* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 8.49 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.231 98.00 Impervious 0.047 39.00 Landscape 0.278 88.03 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 Qp = 2.185 cfs 110
Page 194
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-102 ROOF Hyd. No. 8 Hydrograph Type = NRCS Runoff Peak Flow = 1.645 cfs Storm Frequency = 100-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 5,463 cuft Drainage Area = 0.213 ac Curve Number = 86.37* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 8.49 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.171 98.00 Impervious 0.042 39.00 Landscape 0.213 86.37 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.645 cfs 111
Page 195
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-100 Hyd. No. 9 Hydrograph Type = Junction Peak Flow = 3.830 cfs Storm Frequency = 100-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 12,801 cuft Inflow Hydrographs = 7, 8 Total Contrib. Area = 0.491 ac PR-101 PR-102 ROOF PR-100 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 4 Qp = 3.830 cfs 112
Page 196
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-102 ROOF INF Hyd. No. 10 Hydrograph Type = Pond Route Peak Flow = 0.106 cfs Storm Frequency = 100-yr Time to Peak = 12.98 hrs Time Interval = 1 min Hydrograph Volume = 363 cuft Inflow Hydrograph = 8 - PR-102 ROOF Max. Elevation = 196.71 ft Pond Name = F-ROOF INF-100 Max. Storage = 2,500 cuft Pond Routing by Storage Indication Method Center of mass detention time = 16 min PR-102 ROOF PR-102 ROOF INF Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 0.106 cfs 113
Page 197
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-200 (SYSTEM #1) Hyd. No. 11 Hydrograph Type = NRCS Runoff Peak Flow = 2.816 cfs Storm Frequency = 100-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 8,975 cuft Drainage Area = 0.405 ac Curve Number = 78.62* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 8.49 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.272 98.00 Impervious 0.133 39.00 Landscape 0.405 78.62 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 Qp = 2.816 cfs 114
Page 198
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-300 Hyd. No. 12 Hydrograph Type = NRCS Runoff Peak Flow = 1.351 cfs Storm Frequency = 100-yr Time to Peak = 12.12 hrs Time Interval = 1 min Runoff Volume = 4,457 cuft Drainage Area = 0.177 ac Curve Number = 85.33* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 8.49 in Design Storm = NOAA-D Storm Duration = 24 hrs Shape Factor = 484 * Composite CN Worksheet AREA (ac) CN DESCRIPTION 0.139 98.00 Impervious 0.038 39.00 Landscape 0.177 85.33 Weighted CN Method Employed Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 Qp = 1.351 cfs 115
Page 199
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-SYSTEM #3 Hyd. No. 13 Hydrograph Type = Junction Peak Flow = 5.181 cfs Storm Frequency = 100-yr Time to Peak = 12.12 hrs Time Interval = 1 min Hydrograph Volume = 17,258 cuft Inflow Hydrographs = 12 Total Contrib. Area = 0.177 ac PR-100 PR-300 PR-SYSTEM #3 Time (hrs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 0 1 2 3 4 5 6 Qp = 5.181 cfs 116
Page 200
Hydrograph Report Project Name: DORSET LOT F Hydrology Studio v 3.0.0.44 File: 20260629DORSET LOT F Hydrology.hys 06-29-2026 PR-200 STC 900 Hyd. No. 14 Hydrograph Type = Rational Peak Flow = 11.59 cfs Storm Frequency = 100-yr Time to Peak = 0.08 hrs Time Interval = 1 min Runoff Volume = 5,217 cuft Drainage Area = 1.14 ac Runoff Coeff. = 0.72* Tc Method = User Time of Conc. (Tc) = 5.0 min IDF Curve = 20260625DORSET LOT F NOAA IDF.idf Intensity = 11.30 in/hr Freq. Corr. Factor = 1.25 Asc/Rec Limb Factors = 1/2 * Composite C Worksheet AREA (ac) C DESCRIPTION 0.792 0.90 Impervious 0.348 0.30 Landscape 1.14 0.72 Time (min) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 0 1 2 3 4 5 6 7 8 9 10 11 12 13 Qp = 11.59 cfs 117
Page 201
Design Storm Report Custom Storm filename: Hydrology Studio v 3.0.0.44 06-29-2026 Storm Distribution: NOAA-D, 24-hr Total Rainfall Volume (in)Storm Duration 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr ✔ 100-yr 24 hrs 2.62 3.29 0.00 4.39 5.30 6.56 7.47 8.49 Incremental Rainfall Distribution, 100-yr Time Time Time Time TimePrecip Precip Precip Precip Precip (hrs) (hrs) (hrs) (hrs) (hrs)(in) (in) (in) (in) (in) 11.60 0.025611 11.62 0.026956 11.63 0.026955 11.65 0.026957 11.67 0.026955 11.68 0.026957 11.70 0.026954 11.72 0.036973 11.73 0.036975 11.75 0.036973 11.77 0.036975 11.78 0.036973 11.80 0.036977 11.82 0.051306 11.83 0.051309 11.85 0.051307 11.87 0.051306 11.88 0.051309 11.90 0.051307 11.92 0.088510 11.93 0.088506 11.95 0.088511 11.97 0.088506 11.98 0.088511 12.00 0.088504 12.02 0.147680 12.03 0.147688 12.05 0.147680 12.07 0.147688 12.08 0.147680 12.10 0.147688 12.12 0.051306 12.13 0.051310 12.15 0.051306 12.17 0.051307 12.18 0.051310 12.20 0.051307 12.22 0.036974 12.23 0.036973 12.25 0.036975 12.27 0.036973 12.28 0.036975 12.30 0.036972 12.32 0.026955 12.33 0.026957 12.35 0.026955 12.37 0.026957 12.38 0.026955 12.40 0.026958 12.42 0.025611 12.43 0.025613 12.45 0.025611 12.47 0.025610 12.48 0.025613 12.50 0.025611 Time (hrs) 0 2 4 6 8 10 12 14 16 18 20 22 24 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 118
Page 202
IDF Report IDF filename: 20260625DORSET LOT F NOAA IDF.idf 06-29-2026Hydrology Studio v 3.0.0.44 Intensity = B / (Tc + D)^E (in/hr)Equation Coefficients 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr B 10.0735 11.9924 0.0000 15.1719 17.7838 21.4293 24.0193 26.8587 D 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 E 0.5465 0.5448 0.0000 0.5422 0.5414 0.5404 0.5383 0.5379 Minimum Tc = 5 minutes Intensity Values (in/hr)Tc (min) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr Cf 1.00 1.00 1.00 1.00 1.00 1.10 1.20 1.25 5 4.18 4.99 0 6.34 7.44 8.98 10.10 11.30 10 2.86 3.42 0 4.35 5.11 6.17 6.95 7.78 15 2.29 2.74 0 3.49 4.10 4.96 5.59 6.26 20 1.96 2.34 0 2.99 3.51 4.25 4.79 5.36 25 1.73 2.08 0 2.65 3.11 3.76 4.25 4.75 30 1.57 1.88 0 2.40 2.82 3.41 3.85 4.31 35 1.44 1.73 0 2.21 2.59 3.14 3.54 3.97 40 1.34 1.61 0 2.05 2.41 2.92 3.30 3.69 45 1.26 1.51 0 1.93 2.26 2.74 3.10 3.47 50 1.19 1.42 0 1.82 2.14 2.59 2.92 3.27 55 1.13 1.35 0 1.73 2.03 2.46 2.78 3.11 60 1.07 1.29 0 1.65 1.94 2.34 2.65 2.97 Cf = Correction Factor applied to Rational Method runoff coefficient. 100yr 50yr 25yr 10yr 5yr 2yr 1yr Time (min) 0 5 10 15 20 25 30 35 40 45 50 55 60 1 2 3 4 5 6 7 8 9 10 11 12 DORSET LOT F 119
Page 203
Precipitation Report Precipitation filename: 20260625DORSET LOT F NOAA Precipitation.pcp Hydrology Studio v 3.0.0.44 (Rainfall totals in Inches) 06-29-2026 Active 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr Active ✔✔ ✔✔✔✔✔ SCS Storms > SCS Dimensionless Storms SCS 6hr 1.83 2.22 0 2.86 3.39 4.12 4.65 5.24 Type I, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 Type IA, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 Type II, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 Type II FL, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 Type III, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 Synthetic Storms > IDF-Based Synthetic Storms 1-hr 1.07 1.29 0 1.65 1.94 2.34 2.65 2.97 2-hr 1.47 1.77 0 2.26 2.66 3.22 3.65 4.09 3-hr 1.77 2.12 0 2.73 3.21 3.88 4.40 4.93 6-hr 2.42 2.91 0 3.74 4.41 5.34 6.06 6.79 12-hr 3.32 3.99 0 5.14 6.06 7.35 8.35 9.36 24-hr 4.54 5.48 0 7.06 8.32 10.10 11.50 12.89 Huff Distribution > 1st Quartile (0 to 6 hrs) 1-hr 0.99 1.19 0 1.52 1.79 2.16 2.44 2.74 2-hr 1.27 1.52 0 1.94 2.28 2.75 3.10 3.48 3-hr 1.46 1.76 0 2.24 2.63 3.18 3.59 4.02 6-hr 1.83 2.22 0 2.86 3.39 4.12 4.65 5.24 Huff Distribution > 2nd Quartile (>6 to 12 hrs) 8-hr 00000000 12-hr 2.25 2.77 0 3.63 4.34 5.31 6.03 6.82 Huff Distribution > 3rd Quartile (>12 to 24 hrs) 18-hr 00000000 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 Custom Storms > Custom Storm Distributions My Custom Storm 1 00000000 My Custom Storm 2 00000000 My Custom Storm 3 00000000 My Custom Storm 4 00000000 My Custom Storm 5 00000000 My Custom Storm 6 00000000 My Custom Storm 7 00000000 My Custom Storm 8 00000000 My Custom Storm 9 00000000 My Custom Storm 10 00000000 120
Page 204
Precipitation Report Cont'd Precipitation filename: 20260625DORSET LOT F NOAA Precipitation.pcp Rainfall totals in Inches 06-29-2026 Active 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr Active ✔✔ ✔✔✔✔✔ Huff Indiana > Indianapolis 30-min 0.78 0.94 0 1.20 1.41 1.70 1.92 2.16 1-hr 0.99 1.19 0 1.52 1.79 2.16 2.44 2.74 2-hr 1.27 1.52 0 1.94 2.28 2.75 3.10 3.48 3-hr 1.46 1.76 0 2.24 2.63 3.18 3.59 4.02 6-hr 1.83 2.22 0 2.86 3.39 4.12 4.65 5.24 12-hr 2.25 2.77 0 3.63 4.34 5.31 6.03 6.82 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 Huff Indiana > Evansville 30-min 0.78 0.94 0 1.20 1.41 1.70 1.92 2.16 1-hr 0.99 1.19 0 1.52 1.79 2.16 2.44 2.74 2-hr 1.27 1.52 0 1.94 2.28 2.75 3.10 3.48 3-hr 1.46 1.76 0 2.24 2.63 3.18 3.59 4.02 6-hr 1.83 2.22 0 2.86 3.39 4.12 4.65 5.24 12-hr 2.25 2.77 0 3.63 4.34 5.31 6.03 6.82 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 Huff Indiana > Fort Wayne 30-min 0.78 0.94 0 1.20 1.41 1.70 1.92 2.16 1-hr 0.99 1.19 0 1.52 1.79 2.16 2.44 2.74 2-hr 1.27 1.52 0 1.94 2.28 2.75 3.10 3.48 3-hr 1.46 1.76 0 2.24 2.63 3.18 3.59 4.02 6-hr 1.83 2.22 0 2.86 3.39 4.12 4.65 5.24 12-hr 2.25 2.77 0 3.63 4.34 5.31 6.03 6.82 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 Huff Indiana > South Bend 30-min 0.78 0.94 0 1.20 1.41 1.70 1.92 2.16 1-hr 0.99 1.19 0 1.52 1.79 2.16 2.44 2.74 2-hr 1.27 1.52 0 1.94 2.28 2.75 3.10 3.48 3-hr 1.46 1.76 0 2.24 2.63 3.18 3.59 4.02 6-hr 1.83 2.22 0 2.86 3.39 4.12 4.65 5.24 12-hr 2.25 2.77 0 3.63 4.34 5.31 6.03 6.82 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 121
Page 205
Precipitation Report Cont'd Precipitation filename: 20260625DORSET LOT F NOAA Precipitation.pcp Rainfall totals in Inches 06-29-2026 Active 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr Active ✔✔ ✔✔✔✔✔ NRCS Storms > NRCS Dimensionless Storms NRCS MSE1, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 NRCS MSE2, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 NRCS MSE3, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 NRCS MSE4, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 NRCS MSE5, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 NRCS MSE6, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 NOAA-A, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 NOAA-B, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 NOAA-C, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 NOAA-D, 24-hr ✔ 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 NRCC-A, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 NRCC-B, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 NRCC-C, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 NRCC-D, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 CA-1, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 CA-2, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 CA-3, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 CA-4, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 CA-5, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 CA-6, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 FDOT Storms > Florida DOT Storms FDOT, 1-hr 0.99 1.19 0 1.52 1.79 2.16 2.44 2.74 FDOT, 2-hr 1.27 1.52 0 1.94 2.28 2.75 3.10 3.48 FDOT, 4-hr 00000000 FDOT, 8-hr 00000000 FDOT, 24-hr 2.62 3.29 0 4.39 5.30 6.56 7.47 8.49 FDOT, 72-hr 00000000 SFWMD, 72-hr 00000000 Austin Storms > Austin Frequency Storms Austin Zone 1, 24-hr 00000000 Austin Zone 2, 24-hr 00000000 122
Page 206
DIAMOND SPARKLE CAR WASH 10 DORSET CROSSING SIMSBURY, CONNECTICUT APPENDIX C TREATMENT CALCULATIONS SQM TREATMENT SUMMARY TABLE TREATMENT CALCULATIONS: PR-102 ROOF TREATMENT CALCULATIONS: PR-200 TREATMENT CALCULATIONS: PR-F-102 TREATMENT CALCULATIONS: PR-F-301 TREATMENT CALCULATIONS: EX-101 (APPROVED PAD) TREATMENT CALCULATIONS: EX-F-100 (PROPOSED SITE)
Page 207
Page 208
10 DORSET CROSSING SIMSBURY, CT SQM AREA DA IA WQV WQF Standard Label acre acre acre-ft cfs Method Vol Flow Area Note 2023 PR-102 ROOF 0.213 0.171 0.018 0.22 MC-3500 0.055 N/A N/A 100% WQV 2023 PR-200 1.140 0.792 0.083 1.03 STC 900 N/A 1.4 N/A 100% WQF 2023 PR-F-102 0.129 0.105 0.011 0.14 DEEP SUMP N/A N/A N/A <0.25 AC OK 2023 PR-F-301 0.177 0.139 0.015 0.18 DEEP SUMP N/A N/A N/A <0.25 AC OK 2004 EX-101 0.191 0.144 0.012 0.14 WQ BASIN #3 N/A N/A N/A Approved PAD 2023 EX-F100 0.138 0.126 0.013 0.16 WQ BASIN #3 N/A N/A N/A Negligible Change PROPOSED TREATMENT TABLE 2: PROPOSED TREATMENT SUMMARY SQM TREATMENT SUMMARY TABLE COMPARISON OF SITE DRAINING TO SYSTEM #1 (WQ BASIN #3) WITHOUT ON-SITE TREATMENT
Page 209
Page 210
Yantic River Consultants, LLC Dorset Crossing Lot F Simsbury, CT WQV = Water Quality Volume (acre-feet) P = 1.3" (90th percentile rainfall event) (P)(R)(A) R = Volumetric Runoff Coefficient, 0.050 + 0.009(I) 12 I = Percent Impervious Cover, Impervious Area / Total Area DA = 0.213 acres DA = Drainage Area (Acres) DCIA = 0.171 acres DCIA = Directly Connected Impervious Area (Acres) I = 80% R = 0.77 ac-ft V(req) cf V(prop) cf Required Percent WQV = 0.018 = 777 2400 NO 0% Q = Runoff Depth (in watershed inches) WQV WQV = Water Quality Volume (acre-feet) DA DA = Drainage Area (acres) Q(in) = 1.00 watershed inches Q(in) = 1.00 watershed inches P = 1.3 in CN = 96 Ia = 0.083 inches Tc = 0.10 hours Ia/P = 0.06 qu = 660 csm/in WQF = Water Quality Flow (cfs) WQF = (qu)(DA)(Q) qu = unit peak discharge (cfs/mi2/inch) DA = drainage area (mi2) Q(in) = runoff depth (watershed inches) WQF = 0.221 cfs WQV = Q = Calculate WQV Compute Runoff Depth 2023 STORMWATER TREATMENT CALCULATIONS [PR-102 ROOF] Compute Water Quality Volume Determine Percent Impervious Cover (I) Calculate Volumetric Runoff Coefficient (R) V(req) cf 0 V(prop) cf N/A Calculate Sediment Forebay Volume Determine NCRS Curve Number (CN) TR-55 Figure 2-1 TR-55 Exhibit 4-III Compute Water Quality Flow Determine Initial Abstraction (Ia) TR-55 Table 4-1 Determine Unit Peak Discharge (qu) Time of Concentration (Tc), referenced from Pipe Flow Calculation Worksheet 6/26/26
Page 211
Page 212
Page 213
Return to Outlet Treatment Summary
Page 214
Yantic River Consultants, LLC Dorset Crossing Lot F Simsbury, CT WQV = Water Quality Volume (acre-feet) P = 1.3" (90th percentile rainfall event) (P)(R)(A) R = Volumetric Runoff Coefficient, 0.050 + 0.009(I) 12 I = Percent Impervious Cover, Impervious Area / Total Area DA = 1.140 acres DA = Drainage Area (Acres) DCIA = 0.792 acres DCIA = Directly Connected Impervious Area (Acres) I = 69% R = 0.68 ac-ft V(req) cf V(prop) cf Required Percent WQV = 0.083 = 3633 N/A NO 0% Q = Runoff Depth (in watershed inches) WQV WQV = Water Quality Volume (acre-feet) DA DA = Drainage Area (acres) Q(in) = 0.88 watershed inches Q(in) = 0.88 watershed inches P = 1.3 in CN = 98 Ia = 0.105 inches Tc = 0.10 hours Ia/P = 0.08 qu = 660 csm/in WQF = Water Quality Flow (cfs) WQF = (qu)(DA)(Q) qu = unit peak discharge (cfs/mi2/inch) DA = drainage area (mi2) Q(in) = runoff depth (watershed inches) WQF = 1.032 cfs CONTECH STC 900 APPROVED TREATMENT RATE = 1.4 CFS WQV = Q = Calculate WQV Compute Runoff Depth STORMWATER TREATMENT CALCULATIONS [PR-200 CONTECH STC 900] Compute Water Quality Volume Determine Percent Impervious Cover (I) Calculate Volumetric Runoff Coefficient (R) V(req) cf 0 V(prop) cf N/A Calculate Sediment Forebay Volume Determine NCRS Curve Number (CN) TR-55 Figure 2-1 TR-55 Exhibit 4-III Compute Water Quality Flow Determine Initial Abstraction (Ia) TR-55 Table 4-1 Determine Unit Peak Discharge (qu) Time of Concentration (Tc), referenced from Pipe Flow Calculation Worksheet 6/26/26
Page 215
Page 216
Page 217
Return to Outlet Treatment Summary
Page 218
Yantic River Consultants, LLC Dorset Crossing Lot F Simsbury, CT WQV = Water Quality Volume (acre-feet) P = 1.3" (90th percentile rainfall event) (P)(R)(A) R = Volumetric Runoff Coefficient, 0.050 + 0.009(I) 12 I = Percent Impervious Cover, Impervious Area / Total Area DA = 0.129 acres DA = Drainage Area (Acres) DCIA = 0.105 acres DCIA = Directly Connected Impervious Area (Acres) I = 81% R = 0.78 ac-ft V(req) cf V(prop) cf Required Percent WQV = 0.011 = 476 N/A NO 0% Q = Runoff Depth (in watershed inches) WQV WQV = Water Quality Volume (acre-feet) DA DA = Drainage Area (acres) Q(in) = 1.02 watershed inches Q(in) = 1.02 watershed inches P = 1.3 in CN = 96 Ia = 0.083 inches Tc = 0.10 hours Ia/P = 0.06 qu = 660 csm/in WQF = Water Quality Flow (cfs) WQF = (qu)(DA)(Q) qu = unit peak discharge (cfs/mi2/inch) DA = drainage area (mi2) Q(in) = runoff depth (watershed inches) WQF = 0.135 cfs WQV = Q = Calculate WQV Compute Runoff Depth STORMWATER TREATMENT CALCULATIONS [PR-F-102] Compute Water Quality Volume Determine Percent Impervious Cover (I) Calculate Volumetric Runoff Coefficient (R) V(req) cf 0 V(prop) cf N/A Calculate Sediment Forebay Volume Determine NCRS Curve Number (CN) TR-55 Figure 2-1 TR-55 Exhibit 4-III Compute Water Quality Flow Determine Initial Abstraction (Ia) TR-55 Table 4-1 Determine Unit Peak Discharge (qu) Time of Concentration (Tc), referenced from Pipe Flow Calculation Worksheet 6/26/26
Page 219
Page 220
Page 221
Return to Outlet Treatment Summary
Page 222
Yantic River Consultants, LLC Dorset Crossing Lot F Simsbury, CT WQV = Water Quality Volume (acre-feet) P = 1.3" (90th percentile rainfall event) (P)(R)(A) R = Volumetric Runoff Coefficient, 0.050 + 0.009(I) 12 I = Percent Impervious Cover, Impervious Area / Total Area DA = 0.177 acres DA = Drainage Area (Acres) DCIA = 0.139 acres DCIA = Directly Connected Impervious Area (Acres) I = 79% R = 0.76 ac-ft V(req) cf V(prop) cf Required Percent WQV = 0.015 = 632 N/A NO 0% Q = Runoff Depth (in watershed inches) WQV WQV = Water Quality Volume (acre-feet) DA DA = Drainage Area (acres) Q(in) = 0.98 watershed inches Q(in) = 0.98 watershed inches P = 1.3 in CN = 96 Ia = 0.083 inches Tc = 0.10 hours Ia/P = 0.06 qu = 660 csm/in WQF = Water Quality Flow (cfs) WQF = (qu)(DA)(Q) qu = unit peak discharge (cfs/mi2/inch) DA = drainage area (mi2) Q(in) = runoff depth (watershed inches) WQF = 0.180 cfs WQV = Q = Calculate WQV Compute Runoff Depth STORMWATER TREATMENT CALCULATIONS [PR-F-301] Compute Water Quality Volume Determine Percent Impervious Cover (I) Calculate Volumetric Runoff Coefficient (R) V(req) cf 0 V(prop) cf N/A Calculate Sediment Forebay Volume Determine NCRS Curve Number (CN) TR-55 Figure 2-1 TR-55 Exhibit 4-III Compute Water Quality Flow Determine Initial Abstraction (Ia) TR-55 Table 4-1 Determine Unit Peak Discharge (qu) Time of Concentration (Tc), referenced from Pipe Flow Calculation Worksheet 6/26/26
Page 223
Page 224
Page 225
Return to Outlet Treatment Summary
Page 226
Yantic River Consultants, LLC Dorset Crossing Lot F Simsbury, CT WQV = Water Quality Volume (acre-feet) R = Volumetric Runoff Coefficient, 0.050 + 0.009(I) I = Percent Impervious Cover, Impervious Area / Total Area DA = Drainage Area (Acres) DA = 0.191 acres IA = Impervious Area (Acres) IA = 0.144 acres I = 75% R = 0.73 Calculate Water Quality Volume WQV = 0.012 acre-feet Vsed = WQV x 0.10 N/A Vsed = N/A cf Q = Runoff Depth (in watershed inches) WQV = Water Quality Volume (acre-feet) DA = Drainage Area (acres) Q(in) = 0.73 watershed inches Q(in) = 0.73 watershed inches P = 1 in CN = 96 Ia = 0.083 inches Tc = 0.10 hours Ia/P = 0.083 qu = 660 csm/in WQF = Water Quality Flow (cfs) qu = unit peak discharge (cfs/mi2/inch) DA = drainage area (mi2) Q(in) = runoff depth (watershed inches) WQF = 0.143 cfs Determine NCRS Curve Number (CN) From Appendix B, Figure 2-1 of the 2004 Connecticut Stormwater Manual From Appendix B, Exhibit 4-111 of the 2004 Connecticut Stormwater Manual Compute Water Quality Flow Determine Initial Abstraction (Ia) From Appendix B, Table 4-1 of the 2004 Connecticut Stormwater Manual Determine Unit Peak Discharge (qu) Time of Concentration (Tc), referenced from Pipe Flow Calculation Worksheet Calculate Minimum Sediment Forebay Volume Sediment Forebay Proposed Compute Runoff Depth 2004 SQM STORMWATER TREATMENT CALCULATIONS [EX-101] Compute Water Quality Volume Determine Percent Impervious Cover (I) Calculate Volumetric Runoff Coefficient (R) 12 )"1( ARWQ V ××= DA WQVQ in )12( )( ×= )(inu QDAqWQF ××= 6/29/26
Page 227
Page 228
Page 229
Return to Outlet Treatment Summary
Page 230
Yantic River Consultants, LLC Dorset Crossing Lot F Simsbury, CT WQV = Water Quality Volume (acre-feet) P = 1.3" (90th percentile rainfall event) (P)(R)(A) R = Volumetric Runoff Coefficient, 0.050 + 0.009(I) 12 I = Percent Impervious Cover, Impervious Area / Total Area DA = 0.138 acres DA = Drainage Area (Acres) DCIA = 0.126 acres DCIA = Directly Connected Impervious Area (Acres) I = 91% R = 0.87 ac-ft V(req) cf V(prop) cf Required Percent WQV = 0.013 = 568 N/A NO 0% Q = Runoff Depth (in watershed inches) WQV WQV = Water Quality Volume (acre-feet) DA DA = Drainage Area (acres) Q(in) = 1.13 watershed inches Q(in) = 1.13 watershed inches P = 1.3 in CN = 97 Ia = 0.062 inches Tc = 0.10 hours Ia/P = 0.05 qu = 660 csm/in WQF = Water Quality Flow (cfs) WQF = (qu)(DA)(Q) qu = unit peak discharge (cfs/mi2/inch) DA = drainage area (mi2) Q(in) = runoff depth (watershed inches) WQF = 0.161 cfs Determine NCRS Curve Number (CN) TR-55 Figure 2-1 TR-55 Exhibit 4-III Compute Water Quality Flow Determine Initial Abstraction (Ia) TR-55 Table 4-1 Determine Unit Peak Discharge (qu) Time of Concentration (Tc), referenced from Pipe Flow Calculation Worksheet WQV = Q = Calculate WQV Compute Runoff Depth 2023 STORMWATER TREATMENT CALCULATIONS [EX-F-100] Compute Water Quality Volume Determine Percent Impervious Cover (I) Calculate Volumetric Runoff Coefficient (R) V(req) cf 0 V(prop) cf N/A Calculate Sediment Forebay Volume 6/26/26
Page 231
Page 232
Page 233
Return to Outlet Treatment Summary
Page 234
DIAMOND SPARKLE CAR WASH 10 DORSET CROSSING SIMSBURY, CONNECTICUT APPENDIX D NRCS SOIL DATA NOAA RAINFALL DATA
Page 235
Page 236
United States Department of Agriculture A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for State of Connecticut, Western Part DORSET CROSSING LOT F Natural Resources Conservation Service June 25, 2026
Page 237
Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/ portal/nrcs/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https://offices.sc.egov.usda.gov/locator/app?agency=nrcs) or your NRCS State Soil Scientist (http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/contactus/? cid=nrcs142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require 2
Page 238
alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. 3
Page 239
Contents Preface.................................................................................................................... 2 How Soil Surveys Are Made..................................................................................5 Soil Map.................................................................................................................. 8 Soil Map................................................................................................................9 Legend................................................................................................................10 Map Unit Legend................................................................................................ 11 Map Unit Descriptions.........................................................................................11 State of Connecticut, Western Part.................................................................13 18—Catden and Freetown soils, 0 to 2 percent slopes...............................13 34A—Merrimac fine sandy loam, 0 to 3 percent slopes..............................15 34B—Merrimac fine sandy loam, 3 to 8 percent slopes..............................17 38C—Hinckley loamy sand, 3 to 15 percent slopes....................................19 38E—Hinckley loamy sand, 15 to 45 percent slopes..................................21 305—Udorthents-Pits complex, gravelly..................................................... 23 307—Urban land......................................................................................... 25 308—Udorthents, smoothed....................................................................... 26 Soil Information for All Uses...............................................................................28 Soil Properties and Qualities.............................................................................. 28 Soil Physical Properties.................................................................................. 28 Saturated Hydraulic Conductivity (Ksat), Standard Classes....................... 28 Soil Qualities and Features.............................................................................32 Hydrologic Soil Group................................................................................. 33 References............................................................................................................37 4
Page 240
How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil-vegetation-landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil 5
Page 241
scientists classified and named the soils in the survey area, they compared the individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research. The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil-landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil-landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field-observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and Custom Soil Resource Report 6
Page 242
identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately. Custom Soil Resource Report 7
Page 243
Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 8
Page 244
9 Custom Soil Resource Report Soil Map 4641730 4641790 4641850 4641910 4641970 4642030 4642090 4641730 4641790 4641850 4641910 4641970 4642030 4642090 683070 683130 683190 683250 683310 683370 683430 683490 683550 683610 683670 683070 683130 683190 683250 683310 683370 683430 683490 683550 683610 683670 41° 54' 35'' N 72° 47' 34'' W 41° 54' 35'' N 72° 47' 6'' W 41° 54' 21'' N 72° 47' 34'' W 41° 54' 21'' N 72° 47' 6'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 18N WGS84 0 100 200 400 600 Feet 0 40 80 160 240 Meters Map Scale: 1:2,940 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale.
Page 245
MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:12,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: State of Connecticut, Western Part Survey Area Data: Version 6, Sep 16, 2025 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Mar 1, 2024—Jul 1, 2024 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 10
Page 246
Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 18 Catden and Freetown soils, 0 to 2 percent slopes 2.0 5.5% 34A Merrimac fine sandy loam, 0 to 3 percent slopes 1.5 4.0% 34B Merrimac fine sandy loam, 3 to 8 percent slopes 2.9 7.9% 38C Hinckley loamy sand, 3 to 15 percent slopes 21.0 57.9% 38E Hinckley loamy sand, 15 to 45 percent slopes 0.5 1.2% 305 Udorthents-Pits complex, gravelly 5.8 16.1% 307 Urban land 0.0 0.1% 308 Udorthents, smoothed 2.6 7.2% Totals for Area of Interest 36.2 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit Custom Soil Resource Report 11
Page 247
descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha-Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. Custom Soil Resource Report 12
Page 248
State of Connecticut, Western Part 18—Catden and Freetown soils, 0 to 2 percent slopes Map Unit Setting National map unit symbol: 2t2r2 Landscape: Lake plains, outwash plains, till plains Elevation: 0 to 1,390 feet Mean annual precipitation: 36 to 71 inches Mean annual air temperature: 39 to 55 degrees F Frost-free period: 140 to 240 days Farmland classification: Not prime farmland Map Unit Composition Catden and similar soils: 45 percent Freetown and similar soils: 35 percent Minor components: 20 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Catden Setting Landscape: Lake plains, outwash plains, till plains Landform: Depressions, Bogs, Fens, Depressions, Depressions, Kettles, Marshes, Swamps Landform position (three-dimensional): Base slope, tread Down-slope shape: Concave Across-slope shape: Concave Parent material: Highly decomposed herbaceous organic material and/or highly decomposed woody organic material Typical profile Oa1 - 0 to 2 inches: muck Oa2 - 2 to 79 inches: muck Properties and qualities Slope: 0 to 2 percent Surface area covered with cobbles, stones or boulders: 0.0 percent Depth to restrictive feature: More than 80 inches Drainage class: Very poorly drained Runoff class: Negligible Capacity of the most limiting layer to transmit water (Ksat): Moderately low to high (0.14 to 14.17 in/hr) Depth to water table: About 0 to 6 inches Frequency of flooding: Rare Frequency of ponding: Frequent Maximum salinity: Nonsaline (0.0 to 1.9 mmhos/cm) Available water supply, 0 to 60 inches: Very high (about 26.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 5w Hydrologic Soil Group: B/D Ecological site: F144AY042NY - Semi-Rich Organic Wetlands Hydric soil rating: Yes Custom Soil Resource Report 13
Page 249
Description of Freetown Setting Landscape: Alluvial plains, outwash plains, uplands Landform: Depressions, Marshes, Depressions, Bogs, Swamps, Kettles Landform position (three-dimensional): Tread, dip Down-slope shape: Concave Across-slope shape: Concave Parent material: Highly decomposed organic material Typical profile Oe - 0 to 2 inches: mucky peat Oa - 2 to 79 inches: muck Properties and qualities Slope: 0 to 2 percent Surface area covered with cobbles, stones or boulders: 0.0 percent Depth to restrictive feature: More than 80 inches Drainage class: Very poorly drained Runoff class: Negligible Capacity of the most limiting layer to transmit water (Ksat): Moderately low to high (0.14 to 14.17 in/hr) Depth to water table: About 0 to 6 inches Frequency of flooding: Rare Frequency of ponding: Frequent Available water supply, 0 to 60 inches: Very high (about 26.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 5w Hydrologic Soil Group: B/D Ecological site: F144AY043MA - Acidic Organic Wetlands Hydric soil rating: Yes Minor Components Natchaug Percent of map unit: 7 percent Landscape: Lake plains, till plains, outwash plains Landform: Depressions, Depressions, Depressions Landform position (three-dimensional): Base slope, tread Down-slope shape: Concave Across-slope shape: Concave Hydric soil rating: Yes Whitman Percent of map unit: 6 percent Landscape: Uplands Landform: Drainageways, Depressions Landform position (three-dimensional): Base slope Down-slope shape: Concave Across-slope shape: Concave Hydric soil rating: Yes Timakwa Percent of map unit: 5 percent Landscape: Outwash plains Custom Soil Resource Report 14
Page 250
Landform: Depressions Landform position (three-dimensional): Base slope Down-slope shape: Concave Across-slope shape: Concave Hydric soil rating: Yes Scarboro Percent of map unit: 2 percent Landscape: Valleys, outwash plains Landform: Depressions, Drainageways, Outwash deltas, Outwash terraces Landform position (three-dimensional): Base slope, tread, dip Down-slope shape: Concave Across-slope shape: Concave, linear Hydric soil rating: Yes 34A—Merrimac fine sandy loam, 0 to 3 percent slopes Map Unit Setting National map unit symbol: 2tyqr Landscape: Outwash plains, valleys Elevation: 0 to 1,100 feet Mean annual precipitation: 36 to 71 inches Mean annual air temperature: 39 to 55 degrees F Frost-free period: 140 to 240 days Farmland classification: All areas are prime farmland Map Unit Composition Merrimac and similar soils: 86 percent Minor components: 14 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Merrimac Setting Landscape: Outwash plains, valleys Landform: Outwash plains, Outwash terraces, Moraines, Eskers, Kames Landform position (two-dimensional): Summit, shoulder, backslope, footslope Landform position (three-dimensional): Side slope, crest, riser, tread Down-slope shape: Convex Across-slope shape: Convex Parent material: Loamy glaciofluvial deposits derived from granite, schist, and gneiss over sandy and gravelly glaciofluvial deposits derived from granite, schist, and gneiss Typical profile Ap - 0 to 10 inches: fine sandy loam Bw1 - 10 to 22 inches: fine sandy loam Bw2 - 22 to 26 inches: stratified gravel to gravelly loamy sand 2C - 26 to 65 inches: stratified gravel to very gravelly sand Custom Soil Resource Report 15
Page 251
Properties and qualities Slope: 0 to 3 percent Depth to restrictive feature: More than 80 inches Drainage class: Somewhat excessively drained Runoff class: Very low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to very high (1.42 to 99.90 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum content: 2 percent Maximum salinity: Nonsaline (0.0 to 1.4 mmhos/cm) Sodium adsorption ratio, maximum: 1.0 Available water supply, 0 to 60 inches: Low (about 4.6 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 1 Hydrologic Soil Group: A Ecological site: F145XY008MA - Dry Outwash Hydric soil rating: No Minor Components Sudbury Percent of map unit: 5 percent Landscape: Lake plains, valleys Landform: Deltas, Terraces, Outwash plains Landform position (two-dimensional): Footslope Landform position (three-dimensional): Tread, dip Down-slope shape: Concave Across-slope shape: Linear Hydric soil rating: No Hinckley Percent of map unit: 5 percent Landscape: Outwash plains, valleys Landform: Deltas, Kames, Eskers, Outwash plains Landform position (two-dimensional): Summit, shoulder, backslope Landform position (three-dimensional): Head slope, nose slope, side slope, crest, rise Down-slope shape: Convex Across-slope shape: Convex, linear Hydric soil rating: No Windsor Percent of map unit: 3 percent Landscape: Valleys Landform: Dunes, Deltas, Outwash terraces, Outwash plains Landform position (two-dimensional): Summit Landform position (three-dimensional): Tread, riser Down-slope shape: Convex, linear Across-slope shape: Convex, linear Hydric soil rating: No Custom Soil Resource Report 16
Page 252
Walpole Percent of map unit: 1 percent Landscape: Outwash plains Landform: Depressions Landform position (three-dimensional): Tread Down-slope shape: Concave Across-slope shape: Concave Ecological site: F144AY028MA - Wet Outwash Hydric soil rating: Yes 34B—Merrimac fine sandy loam, 3 to 8 percent slopes Map Unit Setting National map unit symbol: 2tyqs Landscape: Outwash plains, valleys Elevation: 0 to 1,290 feet Mean annual precipitation: 36 to 71 inches Mean annual air temperature: 39 to 55 degrees F Frost-free period: 140 to 240 days Farmland classification: All areas are prime farmland Map Unit Composition Merrimac and similar soils: 86 percent Minor components: 14 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Merrimac Setting Landscape: Outwash plains, valleys Landform: Outwash plains, Outwash terraces, Moraines, Eskers, Kames Landform position (two-dimensional): Summit, shoulder, backslope, footslope Landform position (three-dimensional): Side slope, crest, riser, tread Down-slope shape: Convex Across-slope shape: Convex Parent material: Loamy glaciofluvial deposits derived from granite, schist, and gneiss over sandy and gravelly glaciofluvial deposits derived from granite, schist, and gneiss Typical profile Ap - 0 to 10 inches: fine sandy loam Bw1 - 10 to 22 inches: fine sandy loam Bw2 - 22 to 26 inches: stratified gravel to gravelly loamy sand 2C - 26 to 65 inches: stratified gravel to very gravelly sand Properties and qualities Slope: 3 to 8 percent Depth to restrictive feature: More than 80 inches Drainage class: Somewhat excessively drained Runoff class: Very low Custom Soil Resource Report 17
Page 253
Capacity of the most limiting layer to transmit water (Ksat): Moderately high to very high (1.42 to 99.90 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum content: 2 percent Maximum salinity: Nonsaline (0.0 to 1.4 mmhos/cm) Sodium adsorption ratio, maximum: 1.0 Available water supply, 0 to 60 inches: Low (about 4.6 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2s Hydrologic Soil Group: A Ecological site: F145XY008MA - Dry Outwash Hydric soil rating: No Minor Components Sudbury Percent of map unit: 5 percent Landscape: Lake plains, valleys Landform: Deltas, Terraces, Outwash plains Landform position (two-dimensional): Footslope Landform position (three-dimensional): Tread, dip Down-slope shape: Concave Across-slope shape: Linear Hydric soil rating: No Hinckley Percent of map unit: 5 percent Landscape: Outwash plains, valleys Landform: Deltas, Kames, Eskers, Outwash plains Landform position (two-dimensional): Summit, shoulder, backslope Landform position (three-dimensional): Head slope, nose slope, side slope, crest, rise Down-slope shape: Convex Across-slope shape: Convex, linear Hydric soil rating: No Windsor Percent of map unit: 3 percent Landscape: Valleys Landform: Dunes, Deltas, Outwash terraces, Outwash plains Landform position (two-dimensional): Summit Landform position (three-dimensional): Tread, riser Down-slope shape: Convex, linear Across-slope shape: Convex, linear Hydric soil rating: No Walpole Percent of map unit: 1 percent Landscape: Outwash plains Landform: Depressions Landform position (three-dimensional): Tread Down-slope shape: Concave Across-slope shape: Concave Custom Soil Resource Report 18
Page 254
Ecological site: F144AY028MA - Wet Outwash Hydric soil rating: Yes 38C—Hinckley loamy sand, 3 to 15 percent slopes Map Unit Setting National map unit symbol: 2svmb Landscape: Uplands, valleys Elevation: 0 to 1,290 feet Mean annual precipitation: 36 to 71 inches Mean annual air temperature: 39 to 55 degrees F Frost-free period: 140 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Hinckley and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Hinckley Setting Landscape: Uplands, valleys Landform: Outwash deltas, Outwash terraces, Moraines, Eskers, Kames, Outwash plains, Kame terraces Landform position (two-dimensional): Summit, shoulder, backslope, footslope, toeslope Landform position (three-dimensional): Head slope, nose slope, side slope, crest, riser, tread Down-slope shape: Concave, convex, linear Across-slope shape: Convex, linear, concave Parent material: Sandy and gravelly glaciofluvial deposits derived from gneiss and/or granite and/or schist Typical profile Oe - 0 to 1 inches: moderately decomposed plant material A - 1 to 8 inches: loamy sand Bw1 - 8 to 11 inches: gravelly loamy sand Bw2 - 11 to 16 inches: gravelly loamy sand BC - 16 to 19 inches: very gravelly loamy sand C - 19 to 65 inches: very gravelly sand Properties and qualities Slope: 3 to 15 percent Depth to restrictive feature: More than 80 inches Drainage class: Excessively drained Runoff class: Very low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to very high (1.42 to 99.90 in/hr) Depth to water table: More than 80 inches Custom Soil Resource Report 19
Page 255
Frequency of flooding: None Frequency of ponding: None Maximum salinity: Nonsaline (0.0 to 1.9 mmhos/cm) Available water supply, 0 to 60 inches: Low (about 3.1 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4e Hydrologic Soil Group: A Ecological site: F144AY022MA - Dry Outwash Hydric soil rating: No Minor Components Windsor Percent of map unit: 5 percent Landscape: Uplands, valleys Landform: Moraines, Eskers, Kames, Outwash deltas, Outwash terraces, Outwash plains, Kame terraces Landform position (two-dimensional): Summit, shoulder, backslope, footslope, toeslope Landform position (three-dimensional): Head slope, nose slope, side slope, crest, riser, tread Down-slope shape: Concave, convex, linear Across-slope shape: Convex, linear, concave Hydric soil rating: No Merrimac Percent of map unit: 5 percent Landscape: Valleys, outwash plains Landform: Kames, Outwash plains, Outwash terraces, Moraines, Eskers Landform position (two-dimensional): Summit, shoulder, backslope, footslope, toeslope Landform position (three-dimensional): Head slope, nose slope, side slope, crest, riser, tread Down-slope shape: Convex Across-slope shape: Convex Hydric soil rating: No Agawam Percent of map unit: 3 percent Landscape: Uplands, valleys Landform: Eskers, Kames, Outwash plains, Kame terraces, Outwash deltas, Outwash terraces, Moraines Landform position (two-dimensional): Summit, shoulder, backslope, toeslope, footslope Landform position (three-dimensional): Head slope, nose slope, side slope, crest, riser, tread Down-slope shape: Concave, convex, linear Across-slope shape: Convex, linear, concave Hydric soil rating: No Sudbury Percent of map unit: 2 percent Landscape: Valleys, uplands Landform: Outwash deltas, Moraines, Outwash plains, Kame terraces, Outwash terraces Custom Soil Resource Report 20
Page 256
Landform position (two-dimensional): Backslope, footslope Landform position (three-dimensional): Base slope, tread Down-slope shape: Concave, linear Across-slope shape: Concave, linear Hydric soil rating: No 38E—Hinckley loamy sand, 15 to 45 percent slopes Map Unit Setting National map unit symbol: 2svmj Landscape: Uplands, valleys Elevation: 0 to 1,280 feet Mean annual precipitation: 36 to 71 inches Mean annual air temperature: 39 to 55 degrees F Frost-free period: 140 to 240 days Farmland classification: Not prime farmland Map Unit Composition Hinckley and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Hinckley Setting Landscape: Uplands, valleys Landform: Eskers, Kames, Outwash deltas, Outwash terraces, Moraines, Outwash plains, Kame terraces Landform position (two-dimensional): Backslope Landform position (three-dimensional): Head slope, nose slope, side slope, crest, riser Down-slope shape: Concave, convex, linear Across-slope shape: Convex, linear, concave Parent material: Sandy and gravelly glaciofluvial deposits derived from gneiss and/or granite and/or schist Typical profile Oe - 0 to 1 inches: moderately decomposed plant material A - 1 to 8 inches: loamy sand Bw1 - 8 to 11 inches: gravelly loamy sand Bw2 - 11 to 16 inches: gravelly loamy sand BC - 16 to 19 inches: very gravelly loamy sand C - 19 to 65 inches: very gravelly sand Properties and qualities Slope: 15 to 45 percent Depth to restrictive feature: More than 80 inches Drainage class: Excessively drained Runoff class: Low Custom Soil Resource Report 21
Page 257
Capacity of the most limiting layer to transmit water (Ksat): Moderately high to very high (1.42 to 99.90 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Maximum salinity: Nonsaline (0.0 to 1.9 mmhos/cm) Available water supply, 0 to 60 inches: Low (about 3.1 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 7e Hydrologic Soil Group: A Ecological site: F144AY022MA - Dry Outwash Hydric soil rating: No Minor Components Windsor Percent of map unit: 5 percent Landscape: Uplands, valleys Landform: Eskers, Kames, Moraines, Outwash deltas, Outwash terraces, Outwash plains, Kame terraces Landform position (two-dimensional): Backslope Landform position (three-dimensional): Head slope, nose slope, side slope, crest, riser Down-slope shape: Concave, convex, linear Across-slope shape: Convex, linear, concave Hydric soil rating: No Merrimac Percent of map unit: 5 percent Landscape: Valleys, outwash plains Landform: Outwash plains, Outwash terraces, Moraines, Eskers, Kames Landform position (two-dimensional): Backslope Landform position (three-dimensional): Head slope, nose slope, side slope, crest, riser Down-slope shape: Convex Across-slope shape: Convex Hydric soil rating: No Agawam Percent of map unit: 3 percent Landscape: Uplands, valleys Landform: Eskers, Kame terraces, Outwash deltas, Outwash terraces, Moraines, Kames, Outwash plains Landform position (two-dimensional): Backslope Landform position (three-dimensional): Head slope, nose slope, side slope, crest, riser Down-slope shape: Concave, convex, linear Across-slope shape: Convex, linear, concave Hydric soil rating: No Sudbury Percent of map unit: 2 percent Landscape: Valleys, uplands Landform: Kames, Eskers, Outwash deltas, Outwash plains, Kame terraces, Outwash terraces, Moraines Custom Soil Resource Report 22
Page 258
Landform position (two-dimensional): Backslope, footslope Landform position (three-dimensional): Base slope, tread Down-slope shape: Concave, linear Across-slope shape: Linear, concave Hydric soil rating: No 305—Udorthents-Pits complex, gravelly Map Unit Setting National map unit symbol: 9lmf Elevation: 0 to 2,000 feet Mean annual precipitation: 43 to 54 inches Mean annual air temperature: 45 to 55 degrees F Frost-free period: 120 to 185 days Farmland classification: Not prime farmland Map Unit Composition Udorthents and similar soils: 65 percent Pits: 25 percent Minor components: 10 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Udorthents Setting Anthropogenic Feature: Sand pits, gravel pits Down-slope shape: Convex Across-slope shape: Linear Parent material: Gravelly outwash Typical profile A - 0 to 5 inches: loam C1 - 5 to 21 inches: gravelly loam C2 - 21 to 80 inches: very gravelly sandy loam Properties and qualities Slope: 0 to 35 percent Depth to restrictive feature: More than 80 inches Drainage class: Moderately well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Very low to high (0.00 to 1.98 in/hr) Depth to water table: About 24 to 54 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 6.8 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4e Hydrologic Soil Group: C Custom Soil Resource Report 23
Page 259
Hydric soil rating: No Description of Pits Typical profile C - 0 to 65 inches: very gravelly sand Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 8 Hydric soil rating: Unranked Minor Components Hinckley Percent of map unit: 2 percent Landscape: Valleys Landform: Terraces, Outwash plains, Kames, Eskers Down-slope shape: Convex Across-slope shape: Convex Hydric soil rating: No Windsor Percent of map unit: 2 percent Landscape: Valleys Landform: Terraces, Outwash plains, Kames Down-slope shape: Convex Across-slope shape: Convex Hydric soil rating: No Merrimac Percent of map unit: 2 percent Landscape: Valleys Landform: Terraces, Outwash plains, Kames Down-slope shape: Linear Across-slope shape: Linear Hydric soil rating: No Gloucester Percent of map unit: 2 percent Landscape: Uplands Landform: Hills Down-slope shape: Convex Across-slope shape: Convex Hydric soil rating: No Ninigret Percent of map unit: 1 percent Landscape: Valleys Landform: Terraces, Outwash plains Down-slope shape: Linear Across-slope shape: Concave Hydric soil rating: No Sudbury Percent of map unit: 1 percent Landscape: Valleys Landform: Terraces, Outwash plains Custom Soil Resource Report 24
Page 260
Down-slope shape: Concave Across-slope shape: Linear Hydric soil rating: No 307—Urban land Map Unit Setting National map unit symbol: 9lmh Elevation: 0 to 2,000 feet Mean annual precipitation: 43 to 56 inches Mean annual air temperature: 45 to 55 degrees F Frost-free period: 120 to 185 days Farmland classification: Not prime farmland Map Unit Composition Urban land: 80 percent Minor components: 20 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Urban Land Typical profile H - 0 to 6 inches: material Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 8 Hydrologic Soil Group: D Hydric soil rating: Unranked Minor Components Udorthents, wet substratum Percent of map unit: 10 percent Anthropogenic features: Urban land Down-slope shape: Convex Across-slope shape: Linear Hydric soil rating: No Unnamed, undisturbed soils Percent of map unit: 10 percent Hydric soil rating: No Custom Soil Resource Report 25
Page 261
308—Udorthents, smoothed Map Unit Setting National map unit symbol: 9lmj Elevation: 0 to 2,000 feet Mean annual precipitation: 43 to 56 inches Mean annual air temperature: 45 to 55 degrees F Frost-free period: 120 to 185 days Farmland classification: Not prime farmland Map Unit Composition Udorthents and similar soils: 87 percent Minor components: 13 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Udorthents Setting Anthropogenic Feature: Fills Down-slope shape: Convex Across-slope shape: Linear Parent material: Human-transported material Typical profile ^A - 0 to 5 inches: loam ^C1 - 5 to 21 inches: gravelly loam ^C2 - 21 to 79 inches: very gravelly sandy loam Properties and qualities Slope: 0 to 35 percent Depth to restrictive feature: More than 80 inches Drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Very low to high (0.00 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 6.8 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4e Hydrologic Soil Group: B Hydric soil rating: No Minor Components Udorthents, wet substratum Percent of map unit: 7 percent Custom Soil Resource Report 26
Page 262
Anthropogenic features: Fills Hydric soil rating: No Urban land Percent of map unit: 5 percent Anthropogenic features: Urban land Hydric soil rating: No Rock outcrop Percent of map unit: 1 percent Landscape: Uplands Landform: Hills Down-slope shape: Convex Across-slope shape: Convex Hydric soil rating: No Custom Soil Resource Report 27
Page 263
Soil Information for All Uses Soil Properties and Qualities The Soil Properties and Qualities section includes various soil properties and qualities displayed as thematic maps with a summary table for the soil map units in the selected area of interest. A single value or rating for each map unit is generated by aggregating the interpretive ratings of individual map unit components. This aggregation process is defined for each property or quality. Soil Physical Properties Soil Physical Properties are measured or inferred from direct observations in the field or laboratory. Examples of soil physical properties include percent clay, organic matter, saturated hydraulic conductivity, available water capacity, and bulk density. Saturated Hydraulic Conductivity (Ksat), Standard Classes Saturated hydraulic conductivity (Ksat) refers to the ease with which pores in a saturated soil transmit water. The estimates are expressed in terms of micrometers per second. They are based on soil characteristics observed in the field, particularly structure, porosity, and texture. Saturated hydraulic conductivity is considered in the design of soil drainage systems and septic tank absorption fields. For each soil layer, this attribute is actually recorded as three separate values in the database. A low value and a high value indicate the range of this attribute for the soil component. A "representative" value indicates the expected value of this attribute for the component. For this soil property, only the representative value is used. The numeric Ksat values have been grouped according to standard Ksat class limits. The classes are: Very low: 0.00 to 0.01 Low: 0.01 to 0.1 28
Page 264
Moderately low: 0.1 to 1.0 Moderately high: 1 to 10 High: 10 to 100 Very high: 100 to 705 Custom Soil Resource Report 29
Page 265
30 Custom Soil Resource Report Map—Saturated Hydraulic Conductivity (Ksat), Standard Classes 4641730 4641790 4641850 4641910 4641970 4642030 4642090 4641730 4641790 4641850 4641910 4641970 4642030 4642090 683070 683130 683190 683250 683310 683370 683430 683490 683550 683610 683670 683070 683130 683190 683250 683310 683370 683430 683490 683550 683610 683670 41° 54' 35'' N 72° 47' 34'' W 41° 54' 35'' N 72° 47' 6'' W 41° 54' 21'' N 72° 47' 34'' W 41° 54' 21'' N 72° 47' 6'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 18N WGS84 0 100 200 400 600 Feet 0 40 80 160 240 Meters Map Scale: 1:2,940 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale.
Page 266
MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons Very Low (0.0 - 0.01) Low (0.01 - 0.1) Moderately Low (0.1 - 1) Moderately High (1 - 10) High (10 - 100) Very High (100 - 705) Not rated or not available Soil Rating Lines Very Low (0.0 - 0.01) Low (0.01 - 0.1) Moderately Low (0.1 - 1) Moderately High (1 - 10) High (10 - 100) Very High (100 - 705) Not rated or not available Soil Rating Points Very Low (0.0 - 0.01) Low (0.01 - 0.1) Moderately Low (0.1 - 1) Moderately High (1 - 10) High (10 - 100) Very High (100 - 705) Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:12,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: State of Connecticut, Western Part Survey Area Data: Version 6, Sep 16, 2025 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Mar 1, 2024—Jul 1, 2024 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 31
Page 267
Table—Saturated Hydraulic Conductivity (Ksat), Standard Classes Map unit symbol Map unit name Rating (micrometers per second) Acres in AOI Percent of AOI 18 Catden and Freetown soils, 0 to 2 percent slopes 10.0000 2.0 5.5% 34A Merrimac fine sandy loam, 0 to 3 percent slopes 100.0000 1.5 4.0% 34B Merrimac fine sandy loam, 3 to 8 percent slopes 100.0000 2.9 7.9% 38C Hinckley loamy sand, 3 to 15 percent slopes 100.0000 21.0 57.9% 38E Hinckley loamy sand, 15 to 45 percent slopes 100.0000 0.5 1.2% 305 Udorthents-Pits complex, gravelly 23.0435 5.8 16.1% 307 Urban land 0.0 0.1% 308 Udorthents, smoothed 23.0435 2.6 7.2% Totals for Area of Interest 36.2 100.0% Rating Options—Saturated Hydraulic Conductivity (Ksat), Standard Classes Units of Measure: micrometers per second Aggregation Method: Dominant Component Component Percent Cutoff: None Specified Tie-break Rule: Fastest Interpret Nulls as Zero: No Layer Options (Horizon Aggregation Method): Depth Range (Weighted Average) Top Depth: 12 Bottom Depth: 48 Units of Measure: Inches Soil Qualities and Features Soil qualities are behavior and performance attributes that are not directly measured, but are inferred from observations of dynamic conditions and from soil properties. Example soil qualities include natural drainage, and frost action. Soil features are attributes that are not directly part of the soil. Example soil features Custom Soil Resource Report 32
Page 268
include slope and depth to restrictive layer. These features can greatly impact the use and management of the soil. Hydrologic Soil Group Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Custom Soil Resource Report 33
Page 269
34 Custom Soil Resource Report Map—Hydrologic Soil Group 4641730 4641790 4641850 4641910 4641970 4642030 4642090 4641730 4641790 4641850 4641910 4641970 4642030 4642090 683070 683130 683190 683250 683310 683370 683430 683490 683550 683610 683670 683070 683130 683190 683250 683310 683370 683430 683490 683550 683610 683670 41° 54' 35'' N 72° 47' 34'' W 41° 54' 35'' N 72° 47' 6'' W 41° 54' 21'' N 72° 47' 34'' W 41° 54' 21'' N 72° 47' 6'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 18N WGS84 0 100 200 400 600 Feet 0 40 80 160 240 Meters Map Scale: 1:2,940 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale.
Page 270
MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:12,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: State of Connecticut, Western Part Survey Area Data: Version 6, Sep 16, 2025 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Mar 1, 2024—Jul 1, 2024 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 35
Page 271
Table—Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 18 Catden and Freetown soils, 0 to 2 percent slopes B/D 2.0 5.5% 34A Merrimac fine sandy loam, 0 to 3 percent slopes A 1.5 4.0% 34B Merrimac fine sandy loam, 3 to 8 percent slopes A 2.9 7.9% 38C Hinckley loamy sand, 3 to 15 percent slopes A 21.0 57.9% 38E Hinckley loamy sand, 15 to 45 percent slopes A 0.5 1.2% 305 Udorthents-Pits complex, gravelly C 5.8 16.1% 307 Urban land D 0.0 0.1% 308 Udorthents, smoothed B 2.6 7.2% Totals for Area of Interest 36.2 100.0% Rating Options—Hydrologic Soil Group Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Custom Soil Resource Report 36
Page 272
References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/national/soils/?cid=nrcs142p2_054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/ home/?cid=nrcs142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nrcs.usda.gov/wps/portal/nrcs/ detail/national/landuse/rangepasture/?cid=stelprdb1043084 37
Page 273
United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/soils/scientists/?cid=nrcs142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/? cid=nrcs142p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf Custom Soil Resource Report 38
Page 274
/0 /1/2 /2 /i255/2 /4/5/6/7/i255/8/9/10/i255/11/12 /5/13 /14/15 /i255/8/16/10/i255/11 /15/17/7/18/12 /19 /i255/20 /21 /12 /22/6/4/18/12 /19 /i255/19 /6/14/15 /23/i255/24 /18/14/7 /25 /13 /17/26/10/i255/27 /12 /19 /19 /15/22/4/18/22/13 /4/10/i255/28 /24 /2 /29 /21 /6/4/18/4/13 /30 /15/23/i255/9/8/31/32/16/33/33/34/10/i255/21 /12 /19 /35 /18/4/13 /30 /15/23/i255/36/33/37/31/33/38/38/39/34 /40 /5/15/41/6/4/18/12 /19 /23/i255/37/16/8/i255/42/4/29/29 /43/i255/45/46/47/48/49/50/51/i255/52 /53 /54 /55/i255/56/57 /58/45 /43/43/i255/45/46/47/48/49/50/51/i255/59 /53 /60/53 /61 /1/62 /0 /63 /i255/61 /64 /40 /27 /62/61 /62/63/2 /63 /62/1/0 /i255/65 /64 /40 /66/28 /40 /0 /27 /67 /i255/40 /24 /63 /62/68/2 /63 /40 /24 /53 /57/69/70/57/i255/71 /50/48/72/49/57/73/i255/53 /57/69/74/48/57/i255/71 /57/75/76/46/75/72/49/73/i255/56/72 /49/77/57/50/76/i255/53 /78/79/i255/80/57/47/48/50/69/78/73/i255/81 /57/48/76/i255/82/48/83/58/57/76/47/84/73/i255/85 /57/76/50/i255/59 /69/48/47/77/73/i255/86/48 /76/57/69/i255/87/72 /76/77/72/78/50 /88 /86/89 /89 /73/i255/88 /57/78/72/46/69/57/76/i255/87/50 /57/78/77/50/48/i255/53 /50/48/75/72/49/50/73/i255/53 /72/76/75/50/48/i255/53 /58/48/72/69/90/73/i255/56/57 /48/83/76/57/69/74 /71 /91 /92/78/57/93/47/76/57/48/i255/94/i255/71 /91 /92/90/48/57/58/77/72/49/57/76/i255/94/i255/56/57 /58/45/92/95 /92/57/50/48/72/57/76/45 /61 /65 /i255/4/6/25 /13 /5/6/17 /61 /96 /24 /36/25 /6/7/15/30 /i255/97 /12 /18/19 /4/i255/97 /17/15/22/18/97 /18/4/6/4/18/12 /19 /i255/42/17/15/98 /13 /15/19 /22/26/i255/15/7/4/18/14/6 /4/15/7/i255/99/18 /4/100 /i255/32/16/101/i255 /22/12 /19 /42/18/30 /15/19 /22/15/i255/18/19 /4/15/17/41/6/5/7/i255/102/18/19 /i255/18/19 /22/100 /15/7/103/8 /104 /105 /106/107/108/109/110 /111 /112 /113/114/106/107/115 /114/i255/106/114/117/105 /106/106/114/111 /117/114/i255/109/111 /108/114/106/113/107/118/i255/119/120/114/107/106/121/122 /123/124/125/123/126/124/125/125/126/123/126/126/124/126/126/125/126/126/123/126/126/126 /125/127/128 /109/111 /16/31/20/9/38 /129/130/79/131/132/133/134/130/79/135/136/130/137 /16/31/9/8/138 /129/130/79/139/131/130/134/130/79/136/139/133/137 /16/31/39/37/38 /129/130/79/135/130/135/134/130/79/132/133/136/137 /16/31/138/37/16 /129/130/79/135/140/131/134/130/79/133/141/141/137 /16/31/33/9/38 /129/130/79/136/136/139/134/141/79/130/131/137 /16/31/38/9/9 /129/130/79/132/141/131/134/141/79/141/133/137 /16/31/32/9/9 /129/130/79/132/132/132/134/141/79/139/140/137 /8/31/16/138 /129/130/79/140/130/133/134/141/79/136/140/137 /8/31/37/8 /129/130/79/140/133/136/134/141/79/133/133/137 /8/31/20/9 /129/130/79/133/135/142/134/131/79/141/131/137 /123/126/127/128 /109/111 /16/31/9/32/20 /129/130/79/139/140/142/134/130/79/132/139/140/137 /16/31/39/32/16 /129/130/79/135/136/139/134/130/79/140/132/139/137 /16/31/33/9/38 /129/130/79/136/140/131/134/130/79/142/140/130/137 /16/31/38/33/32 /129/130/79/132/132/142/134/141/79/141/136/137 /8/31/16/138 /129/130/79/140/133/139/134/141/79/135/136/137 /8/31/37/16 /129/130/79/133/132/140/134/141/79/132/140/137 /8/31/20/9 /129/130/79/142/135/139/134/141/79/142/135/137 /8/31/39/16 /129/141/79/130/130/134/131/79/131/139/137 /8/31/33/37 /129/141/79/141/141/134/131/79/132/132/137 /8/31/32/16 /129/141/79/131/130/134/139/79/130/130/137 /123/125/127/128 /109/111 /16/31/39/38/16 /129/130/79/135/135/132/134/130/79/140/135/142/137 /16/31/138/32/9 /129/130/79/136/139/139/134/130/79/133/142/140/137 /16/31/38/38/16 /129/130/79/132/140/135/134/141/79/141/135/137 /8/31/16/20 /129/130/79/140/133/140/134/141/79/139/136/137 /8/31/37/39 /129/130/79/142/131/141/134/141/79/140/130/137 /8/31/9/8 /129/141/79/130/131/134/141/79/142/132/137 /8/31/39/33 /129/141/79/141/141/134/131/79/131/133/137 /8/31/33/138 /129/141/79/141/133/134/131/79/132/131/137 /37/31/16/37 /129/141/79/139/141/134/139/79/141/139/137 /37/31/37/9 /129/141/79/135/131/134/139/79/136/139/137 /143/126/127/128 /109/111 /16/31/33/38/9 /129/130/79/132/130/131/134/141/79/130/141/137 /16/31/32/9/8 /129/130/79/140/131/131/134/141/79/131/131/137 /8/31/37/16 /129/130/79/142/141/140/134/141/79/136/136/137 /8/31/9/8 /129/141/79/130/140/134/141/79/133/135/137 /8/31/33/16 /129/141/79/131/132/134/131/79/139/139/137 /8/31/32/37 /129/141/79/135/130/134/131/79/132/142/137 /37/31/8/138 /129/141/79/136/131/134/139/79/141/139/137 /37/31/9/8 /129/141/79/132/131/134/139/79/136/142/137 /37/31/33/38 /129/141/79/133/130/134/135/79/131/142/137 /20/31/16/33 /129/141/79/142/135/134/135/79/133/136/137 /144/126/127/128 /109/111 /16/31/32/38/33 /129/130/79/140/136/142/134/141/79/131/133/137 /8/31/8/32 /129/130/79/142/141/131/134/141/79/136/135/137 /8/31/39/37 /129/141/79/141/132/134/141/79/142/140/137 /8/31/33/32 /129/141/79/139/132/134/131/79/139/139/137 /37/31/8/138 /129/141/79/132/130/134/131/79/142/136/137 /37/31/9/9 /129/141/79/140/140/134/139/79/135/131/137 /37/31/33/9 /129/141/79/142/139/134/139/79/142/133/137 /20/31/16/138 /129/131/79/130/132/134/135/79/136/140/137 /20/31/39/20 /129/131/79/131/133/134/136/79/135/136/137 /20/31/32/16 /129/131/79/135/140/134/132/79/141/132/137 /124/127/145 /106 /8/31/37/33 /129/130/79/142/133/139/134/141/79/132/139/137 /8/31/39/37 /129/141/79/141/133/134/141/79/142/132/137 /8/31/32/9 /129/141/79/135/142/134/131/79/136/130/137 /37/31/37/38 /129/141/79/140/136/134/131/79/142/132/137 /37/31/33/39 /129/131/79/130/136/134/139/79/140/136/137 /20/31/8/16 /129/131/79/131/140/134/135/79/139/139/137 /20/31/9/38 /129/131/79/135/133/134/136/79/130/132/137 /20/31/32/37 /129/131/79/132/135/134/136/79/133/141/137 /9/31/39/138 /129/131/79/142/132/134/140/79/130/139/137 /39/31/8/8 /129/139/79/131/135/134/133/79/130/139/137 /143/127/145 /106 /8/31/9/138 /129/141/79/141/135/134/141/79/133/140/137 /8/31/33/138 /129/141/79/139/132/134/131/79/131/136/137 /37/31/37/9 /129/141/79/140/139/134/131/79/133/140/137 /37/31/138/20 /129/131/79/130/131/134/139/79/135/130/137 /20/31/8/38 /129/131/79/139/133/134/135/79/139/131/137 /20/31/39/32 /129/131/79/132/135/134/136/79/130/130/137 /9/31/16/37 /129/131/79/133/142/134/136/79/133/132/137 /9/31/39/39 /129/139/79/130/140/134/132/79/140/139/137 /39/31/20/39 /129/139/79/135/133/134/133/79/131/141/137 /138/31/16/37 /129/139/79/133/139/134/142/79/135/135/137 /144/127/145 /106 /8/31/38/20 /129/141/79/135/139/134/131/79/139/139/137 /37/31/37/37 /129/141/79/140/135/134/131/79/133/139/137 /37/31/38/138 /129/131/79/131/139/134/139/79/132/136/137 /20/31/20/32 /129/131/79/132/131/134/135/79/139/136/137 /9/31/8/37 /129/139/79/141/130/134/136/79/136/133/137 /9/31/138/39 /129/139/79/135/135/134/132/79/135/140/137 /39/31/37/9 /129/139/79/140/142/134/140/79/132/139/137 /39/31/32/138 /129/135/79/130/135/134/133/79/140/133/137 /33/31/16/32 /129/135/79/132/131/134/141/130/79/133/137 /38/31/16/33 /129/136/79/141/136/134/141/131/79/132/137 /123/124/127/145 /106 /37/31/37/39 /129/141/79/140/140/134/131/79/133/139/137 /37/31/33/33 /129/131/79/141/133/134/139/79/136/130/137 /20/31/138/20 /129/131/79/133/135/134/135/79/132/130/137 /9/31/20/9 /129/139/79/139/133/134/136/79/136/139/137 /39/31/20/8 /129/135/79/130/139/134/140/79/141/140/137 /138/31/16/20 /129/135/79/136/130/134/133/79/139/132/137 /138/31/38/37 /129/135/79/142/133/134/142/79/142/131/137 /33/31/38/37 /129/136/79/139/141/134/141/141/79/136/137 /32/31/9/16 /129/132/79/141/136/134/141/135/79/139/137 /8/16/31/38 /129/132/79/142/130/134/141/132/79/140/137 /124/146/127/145 /106 /37/31/138/37 /129/131/79/130/140/134/139/79/131/133/137 /20/31/37/32 /129/131/79/132/130/134/135/79/141/139/137 /9/31/20/32 /129/139/79/135/132/134/136/79/136/131/137 /39/31/20/16 /129/135/79/141/132/134/132/79/140/141/137 /138/31/39/138 /129/136/79/130/141/134/133/79/133/131/137 /33/31/9/33 /129/136/79/132/131/134/141/130/79/139/137 /38/31/9/32 /129/132/79/131/132/134/141/131/79/135/137 /32/31/38/37 /129/132/79/132/142/134/141/135/79/139/137 /8/37/31/16 /129/140/79/133/136/134/141/133/79/141/137 /8/20/31/32 /129/133/79/142/130/134/131/141/79/135/137 /124/127/147 /107/120 /37/31/32/20 /129/131/79/139/135/134/139/79/132/136/137 /20/31/33/9 /129/131/79/142/133/134/135/79/132/132/137 /39/31/16/38 /129/135/79/130/139/134/132/79/139/136/137 /138/31/8/38 /129/135/79/133/133/134/140/79/140/133/137 /33/31/33/16 /129/136/79/142/139/134/141/130/79/139/137 /38/31/38/16 /129/132/79/132/133/134/141/131/79/131/137 /8/16/31/16 /129/140/79/135/142/134/141/135/79/140/137 /8/8/31/33 /129/133/79/130/141/134/141/140/79/130/137 /8/9/31/39 /129/142/79/136/135/134/131/141/79/142/137 /8/33/31/16 /129/141/141/79/130/134/131/132/79/141/137 /143/127/147 /107/120 /20/31/37/16 /129/131/79/136/132/134/139/79/142/132/137 /9/31/16/32 /129/139/79/131/140/134/136/79/130/133/137 /39/31/39/138 /129/135/79/135/139/134/132/79/142/131/137 /138/31/33/33 /129/136/79/139/132/134/133/79/135/142/137 /38/31/9/9 /129/132/79/136/139/134/141/141/79/139/137 /32/31/138/39 /129/140/79/139/132/134/141/139/79/139/137 /8/8/31/16 /129/133/79/131/132/134/141/132/79/141/137 /8/37/31/32 /129/133/79/133/139/134/141/133/79/140/137 /8/138/31/16 /129/141/130/79/132/134/131/135/79/141/137 /8/38/31/32 /129/141/131/79/131/134/131/133/79/142/137 /146/127/147 /107/120 /20/31/9/39 /129/131/79/140/140/134/135/79/131/132/137 /9/31/9/16 /129/139/79/136/139/134/136/79/135/136/137 /39/31/32/33 /129/135/79/140/140/134/140/79/135/141/137 /33/31/37/33 /129/136/79/140/133/134/142/79/130/142/137 /32/31/16/138 /129/140/79/130/139/134/141/131/79/141/137 /8/16/31/20 /129/140/79/142/130/134/141/135/79/131/137 /8/8/31/38 /129/133/79/133/133/134/141/140/79/131/137 /8/20/31/38 /129/142/79/135/133/134/131/130/79/130/137 /8/33/31/37 /129/141/141/79/139/134/131/136/79/140/137 /37/16/31/37 /129/141/139/79/141/134/139/130/79/142/137 /148/127/147 /107/120 /9/31/8/9 /129/139/79/139/135/134/136/79/130/133/137 /39/31/37/37 /129/135/79/131/141/134/132/79/135/131/137 /33/31/16/16 /129/136/79/132/131/134/133/79/132/135/137 /38/31/9/33 /129/132/79/140/132/134/141/130/79/136/137 /8/16/31/39 /129/133/79/141/140/134/141/139/79/142/137 /8/37/31/16 /129/142/79/141/132/134/141/132/79/139/137 /8/20/31/138 /129/141/130/79/131/134/141/142/79/140/137 /8/39/31/32 /129/141/130/79/142/134/131/131/79/133/137 /8/32/31/138 /129/141/139/79/130/134/131/142/79/131/137 /37/37/31/32 /129/141/135/79/133/134/139/135/79/142/137 /123/126/127/147 /107/120 /9/31/38/37 /129/139/79/142/130/134/136/79/142/130/137 /39/31/32/33 /129/135/79/133/139/134/140/79/139/131/137 /33/31/38/39 /129/132/79/139/139/134/142/79/132/132/137 /32/31/9/8 /129/140/79/136/135/134/141/141/79/140/137 /8/8/31/138 /129/142/79/130/141/134/141/136/79/131/137 /8/20/31/8 /129/141/130/79/141/134/141/140/79/133/137 /8/9/31/32 /129/141/141/79/131/134/131/141/79/139/137 /8/33/31/37 /129/141/141/79/142/134/131/135/79/132/137 /37/8/31/16 /129/141/139/79/142/134/139/141/79/139/137 /37/9/31/39 /129/141/136/79/142/134/139/140/79/141/137 /124/126/127/147 /107/120 /138/31/32/138 /129/136/79/132/140/134/133/79/135/132/137 /38/31/8/138 /129/132/79/132/135/134/142/79/142/139/137 /8/16/31/8 /129/133/79/131/141/134/141/131/79/135/137 /8/8/31/33 /129/142/79/135/140/134/141/135/79/135/137 /8/9/31/16 /129/141/130/79/142/134/141/133/79/131/137 /8/39/31/138 /129/141/131/79/130/134/131/130/79/142/137 /8/33/31/9 /129/141/139/79/130/134/131/135/79/136/137 /8/32/31/33 /129/141/139/79/140/134/131/133/79/141/137 /37/20/31/9 /129/141/136/79/132/134/139/135/79/132/137 /37/138/31/138 /129/141/140/79/139/134/135/130/79/131/137 /143/126/127/147 /107/120 /38/31/33/138 /129/140/79/141/140/134/141/130/79/132/137 /32/31/32/33 /129/133/79/141/132/134/141/131/79/141/137 /8/37/31/16 /129/142/79/140/136/134/141/135/79/132/137 /8/20/31/138 /129/141/141/79/130/134/141/132/79/140/137 /8/39/31/32 /129/141/131/79/135/134/131/130/79/136/137 /8/33/31/138 /129/141/139/79/136/134/131/139/79/131/137 /8/32/31/9 /129/141/135/79/135/134/131/132/79/133/137 /37/8/31/138 /129/141/136/79/130/134/139/130/79/136/137 /37/9/31/32 /129/141/132/79/132/134/139/132/79/132/137 /37/33/31/33 /129/141/133/79/141/134/135/141/79/140/137 /146/125/127/147 /107/120 /8/8/31/16 /129/142/79/130/136/134/141/139/79/139/137 /8/37/31/20 /129/141/130/79/141/134/141/135/79/133/137 /8/9/31/20 /129/141/141/79/140/134/141/140/79/139/137 /8/138/31/16 /129/141/139/79/130/134/141/142/79/136/137 /8/38/31/20 /129/141/135/79/135/134/131/139/79/135/137 /37/16/31/8 /129/141/136/79/135/134/131/132/79/139/137 /37/8/31/32 /129/141/132/79/131/134/131/142/79/142/137 /37/9/31/16 /129/141/132/79/133/134/139/139/79/140/137 /37/138/31/38 /129/141/133/79/130/134/139/142/79/131/137 /37/32/31/16 /129/141/133/79/142/134/135/139/79/132/137 /144/126/127/147 /107/120 /8/37/31/32 /129/141/130/79/132/134/141/136/79/136/137 /8/9/31/37 /129/141/141/79/140/134/141/140/79/141/137 /8/138/31/20 /129/141/139/79/135/134/141/142/79/140/137 /8/38/31/8 /129/141/135/79/140/134/131/131/79/130/137 /37/16/31/39 /129/141/132/79/141/134/131/132/79/130/137 /37/37/31/9 /129/141/140/79/141/134/131/142/79/130/137 /37/9/31/20 /129/141/140/79/133/134/139/131/79/132/137 /37/138/31/8 /129/141/133/79/135/134/139/132/79/132/137 /37/38/31/39 /129/141/142/79/131/134/135/141/79/132/137 /20/16/31/37 /129/141/142/79/140/134/135/136/79/131/137 /141/i255/71 /48/50/49/72/58/72/78/57/78/72/46/69/i255/149/48/50/150/47/50/69/49/83/i255/129/71 /91 /137/i255/50/45/78/72/151/57 /78/50/45/i255/72/69/i255/78/77/72/45/i255/78/57/93/76/50/i255/57/48/50/i255/93/57/45/50/74/i255/46/69/i255/149/48/50/150/47/50/69/49/83/i255/57/69/57/76/83/45/72/45/i255/46/149/i255/58/57/48/78/72/57/76/i255/74/47/48/57/78/72/46/69/i255/45/50/48/72/50/45/i255/129/71 /85 /53 /137/79 /88 /47/151/93 /50/48/45/i255/72/69/i255/58/57/48/50/69/78/77/50/45/72/45/i255/57/48/50/i255/71 /91 /i255/50/45/78/72/151/57 /78/50/45/i255/57/78/i255/76/46/152 /50/48/i255/57/69/74/i255/47/58/58/50/48/i255/93/46/47/69/74/45/i255/46/149/i255/78/77/50/i255/142/130/153/i255 /49/46/69/149/72/74/50/69/49/50/i255/72/69/78/50/48/75/57/76/79/i255/82 /77/50/i255/58/48/46/93/57/93/72/76/72/78/83/i255/78/77/57/78/i255/58/48/50/49/72/58/72/78/57/78/72/46/69/i255/149/48/50/150/47/50/69/49/83 /50/45/78/72/151/57 /78/50/45/i255/129/149/46/48/i255/57/i255/90/72/75/50/69/i255/74/47/48/57/78/72/46/69/i255/57/69/74/i255/57/75/50/48/57/90/50/i255/48/50/49/47/48/48/50/69/49/50/i255/72/69/78/50/48/75/57/76/137/i255/152 /72/76/76/i255/93/50/i255/90/48/50/57/78/50/48/i255/78/77/57/69/i255/78/77/50/i255/47/58/58/50/48/i255/93/46/47/69/74/i255/129/46/48/i255/76/50/45/45/i255/78/77/57/69/i255/78/77/50/i255/76/46/152 /50/48/i255/93/46/47/69/74/137/i255/72/45/i255/136/153/79 /i255/52 /45/78/72/151/57 /78/50/45/i255/57/78 /47/58/58/50/48/i255/93/46/47/69/74/45/i255/57/48/50/i255/69/46/78/i255/49/77/50/49/84/50/74/i255/57/90/57/72/69/45/78/i255/58/48/46/93/57/93/76/50/i255/151/57 /154/72/151/47 /151/i255 /58/48/50/49/72/58/72/78/57/78/72/46/69/i255/129/71 /56/71 /137/i255/50/45/78/72/151/57 /78/50/45/i255/57/69/74/i255/151/57 /83/i255/93/50/i255/77/72/90/77/50/48/i255/78/77/57/69/i255/49/47/48/48/50/69/78/76/83/i255/75/57/76/72/74/i255/71 /56/71 /i255/75/57/76/47/50/45/79 /71 /76/50/57/45/50/i255/48/50/149/50/48/i255/78/46/i255/88 /86/89 /89 /i255/89 /78/76/57/45/i255/141/135/i255/74/46/49/47/151/50 /69/78/i255/149/46/48/i255/151/46 /48/50/i255/72/69/149/46/48/151/57 /78/72/46/69/79 /155 /57/49/84/i255/78/46/i255/82/46/58 /61 /65 /i255/35 /17/6/97 /100 /18/22/6/5 /132/156/131/136/156/131/132/73/i255/131/51/130/131/i255/71 /56/71/48/50/49/72/58/72/78/57/78/72/46/69/i255/91 /48/50/150/47/50/69/49/83/i255/85 /57/78/57/i255/53 /50/48/75/50/48 /77/78/78/58/45/51/156/156/77/74/45/49/79/69/152 /45/79/69/46/57/57/79/90/46/75/156/58/149/74/45/156/58/149/74/45/92/58/48/72/69/78/58/57/90/50/79/77/78/151/76 /157/76/57/78/158/135/141/79/142/130/140/140/95 /76/46/69/158/159/140/131/79/140/133/133/136/95 /74/57/78/57/158/74/50/58/78/77/95 /47/69/72/78/45/158/50/69/90/76/72/45/77/95 /45/50/48/72/50/45/158/58/74/45/141/156/135
Page 275
/0 /1/2/3/i255/5/6/i255/7/6/8 /9/10 /11 /12/i255/14 /i255/10/15/16/17/10/18/12 /19 /20/10 /18/18/i255/12/21/10/18/15/i255/22/15/16/16/10/17/23 /24/25/26/27/25/26/24/28/i255/26/29/30/26/i255/31 /32/31/33/34/2/35/8/35/5/1/5/35/6/36/i255/37 /33/34/38/39/34/36/2/40/i255/41 /1/5/1/i255/42 /34/33/43/34/33 /44/5/5/8/45/29/25/25/44/46/45/2/47/36/48 /45/47/36/6/1/1/47/49/6/43/25/8/50/46/45/25/8/50/46/45/51/8/33/35/36/5/8/1/49/34/47/44/5/52/53 /54/53/1/5/55/56/57/47/58/30/59/59/60 /53/6/36/55/61/59/26/47/59/62/62/27/60 /46/1/5/1/55/46/34/8/5/44/60 /39/36/35/5/45/55/34/36/49/53/35/45/44/60 /45/34/33/35/34/45/55/8/46/45/26/25/56
Page 276
/0 /1/2/3 /4/i255/6/7/1/8/4/i255/9/4/2/2/1/10/11 /0 /1/2/3 /4/i255/6/7/1/8/4/i255/12/1 /13 /0 /1/2/3 /4/i255/6/7/1/8/4/i255/1/4/2/10/1/8 /14 /15 /16/17/12 /18/12/10 /14 /15 /19/20/20/17/12 /21/20/12/10 /14 /15 /19/20/20/17/12 /21/20/12/10 /22/23/24/25/23/24/22/26/i255/24/28/29/24/i255/30 /31/30/32 /33/34/35/36/35/37/38/37/35/39/40/i255/41 /32 /33/42/43/33/40/34/44/i255/45 /38/37/38/i255/46 /33/32 /47/33/32 /48/37/37/36/49/28/23/23/48/50/49/34/51/40/52 /49/51/40/39/38/38/51/53/39/47/23/36/54/50/49/23/36/54/50/49/55/36/32 /35/40/37/36/38/53/33/51/48/37/56/57 /58/57/38/37/59/60/61/51/62/29/63/63/64 /57/39/40/59/65/63/24/51/63/66/66/25/64 /50/38/37/38/59/50/33/36/37/48/64 /43/40/35/37/49/59/33/40/53/57/35/49/48/64 /49/33/32 /35/33/49/59/36/50/49/67/23/60
Page 277
/0 /1/2/3/i255/5/6/i255/7/6/8 /9 /10 /i255/11 /12/8/1/13/5/14/12 /15/5/i255/6/16/i255/17 /6/14/14/12 /13/2/12 /18 /1/5/19/6/15/1/20/i255/21/2 /12/1/15/19/2/i255/1/15/22/i255/23 /5/14/6 /24/8/25/12/13/19/2/i255/23 /22/14/19 /15/19/24/5/13/1/5/19/6/15 /18 /1/5/19/6/15/1/20/i255/26/12 /1/5/25/12/13/i255/10 /12/13/27/19/2/12 /18 /1/5/19/6/15/1/20/i255/26/1 /5/12/13/i255/17 /12/15/5/12/13 /28/29/30/31 /i255/32 /1/24/5/i255/26/12 /24/5/i255/33 /19/34/25/35 /1/36 /10 /19/20/27/12/13/i255/10 /8/13/19/15/34/37/i255/38/11 /i255/30/39/40/28/39 /41/42 /12/24/5/19/6/15/24/43/44/i255/33 /11 /10 /17 /45/41/42 /12/24/5/19/6/15/24/46/15 /6/1/1/45/34/6/27 /11 /19/24/2/20/1/19/14/12 /13 /47 /48 /49/50/50/51/52 /53/50/52/54 /55/56/30/31 /56/30/55/37/i255/30/44/39/30/i255/57 /38/57/13/12/2/19/8/19/5/1/5/19/6/15/i255/58 /13/12/59/42/12/15/2/36/i255/11 /1/5/1/i255/10 /12/13/27/12/13 /25/5/5/8/24/44/56/56/25/22/24/2/45/15/35 /24/45/15/6/1/1/45/34/6/27/56/8/16/22/24/56/8/16/22/24/60/8/13/19/15/5/8/1/34/12/45/25/5/14/20 /43/20/1/5/61/62/28/45/40/39/63/63/64 /20/6/15/61/65/63/30/45/63/66/66/31 /64 /22/1/5/1/61/22/12/8/5/25/64 /42/15/19/5/24/61/12/15/34/20/19/24/25/64 /24/12/13/19/12/24/61/8/22/24/62/56/62
Page 278
/0 /1/2 /2 /i255/2 /4/5/6/7/i255/8/9/10/i255/11/12 /5/13 /14/15 /i255/8/16/10/i255/11 /15/17/7/18/12 /19 /i255/20 /21 /12 /22/6/4/18/12 /19 /i255/19 /6/14/15 /23/i255/24 /18/14/7 /25 /13 /17/26/10/i255/27 /12 /19 /19 /15/22/4/18/22/13 /4/10/i255/28 /24 /2 /29 /21 /6/4/18/4/13 /30 /15/23/i255/9/8/31/32/16/33/33/34/10/i255/21 /12 /19 /35 /18/4/13 /30 /15/23/i255/36/33/37/31/33/38/38/39/34 /40 /5/15/41/6/4/18/12 /19 /23/i255/37/16/8/i255/42/4/29/29 /43/i255/45/46/47/48/49/50/51/i255/52 /53 /54 /55/i255/56/57 /58/45 /43/43/i255/45/46/47/48/49/50/51/i255/59 /53 /60/53 /61 /1/62 /0 /63 /i255/61 /64 /40 /27 /62/61 /62/63/2 /63 /62/1/0 /i255/65 /64 /40 /66/28 /40 /0 /27 /67 /i255/40 /24 /63 /62/68/2 /63 /40 /24 /53 /57/69/70/57/i255/71 /50/48/72/49/57/73/i255/53 /57/69/74/48/57/i255/71 /57/75/76/46/75/72/49/73/i255/56/72 /49/77/57/50/76/i255/53 /78/79/i255/80/57/47/48/50/69/78/73/i255/81 /57/48/76/i255/82/48/83/58/57/76/47/84/73/i255/85 /57/76/50/i255/59 /69/48/47/77/73/i255/86/48 /76/57/69/i255/87/72 /76/77/72/78/50 /88 /86/89 /89 /73/i255/88 /57/78/72/46/69/57/76/i255/87/50 /57/78/77/50/48/i255/53 /50/48/75/72/49/50/73/i255/53 /72/76/75/50/48/i255/53 /58/48/72/69/90/73/i255/56/57 /48/83/76/57/69/74 /71 /91 /92/78/57/93/47/76/57/48/i255/94/i255/71 /91 /92/90/48/57/58/77/72/49/57/76/i255/94/i255/56/57 /58/45/92/95 /92/57/50/48/72/57/76/45 /61 /65 /i255/4/6/25 /13 /5/6/17 /61 /96 /24 /36/25 /6/7/15/30 /i255/97 /12 /18/19 /4/i255/97 /17/15/22/18/97 /18/4/6/4/18/12 /19 /i255/42/17/15/98 /13 /15/19 /22/26/i255/15/7/4/18/14/6 /4/15/7/i255/99/18 /4/100 /i255/32/16/101/i255 /22/12 /19 /42/18/30 /15/19 /22/15/i255/18/19 /4/15/17/41/6/5/7/i255/102/18/19 /i255/18/19 /22/100 /15/7/103/100 /12 /13 /17/104/8 /105 /106 /107/108/109/110/111 /112 /113 /114/115/107/108/116 /115/i255/107/115/118/106 /107/107/115/112 /118/115/i255/110/112 /109/115/107/114/108/119/i255/120/121/115/108/107/122/123 /124/125/126/124/127/125/126/126/127/124/127/127/125/127/127/126/127/127/124/127/127/127 /126/128/129/110 /112 /9/31/8/38 /130/131/79/132/132/133/134/79/135/136/137 /9/31/32/32 /130/131/79/138/135/133/139/79/135/139/137 /140/31/20/9 /130/135/79/138/134/133/138/79/132/132/137 /33/31/9/9 /130/134/79/139/139/133/141/79/142/131/137 /38/31/32/38 /130/139/79/139/135/133/143/132/79/131/137 /8/16/31/8 /130/142/79/131/135/133/143/135/79/143/137 /8/8/31/20 /130/142/79/141/141/133/143/139/79/134/137 /8/37/31/33 /130/138/79/134/136/133/143/138/79/141/137 /8/9/31/140 /130/141/79/135/132/133/132/132/79/134/137 /8/140/31/8 /130/143/136/79/132/133/132/134/79/135/137 /124/127/128/129/110 /112 /37/31/32/140 /130/132/79/132/142/133/131/79/138/132/137 /20/31/39/9 /130/132/79/142/132/133/135/79/134/138/137 /9/31/9/32 /130/131/79/135/131/133/134/79/138/132/137 /39/31/37/33 /130/135/79/136/143/133/139/79/138/138/137 /140/31/20/39 /130/135/79/142/136/133/138/79/139/141/137 /33/31/8/33 /130/134/79/132/136/133/143/136/79/136/137 /38/31/16/37 /130/134/79/139/139/133/143/143/79/142/137 /38/31/32/33 /130/139/79/136/132/133/143/131/79/135/137 /8/16/31/20 /130/139/79/139/142/133/143/134/79/141/137 /8/8/31/9 /130/142/79/132/132/133/143/138/79/136/137 /124/126/128/129/110 /112 /37/31/20/37 /130/143/79/142/138/133/131/79/136/136/137 /37/31/33/38 /130/132/79/143/131/133/131/79/134/141/137 /20/31/39/37 /130/132/79/142/136/133/135/79/134/142/137 /9/31/8/9 /130/131/79/143/134/133/134/79/135/136/137 /9/31/32/38 /130/131/79/139/138/133/139/79/138/143/137 /39/31/140/20 /130/135/79/136/138/133/142/79/138/139/137 /140/31/20/16 /130/135/79/135/135/133/141/79/143/135/137 /33/31/16/9 /130/135/79/142/132/133/143/136/79/134/137 /38/31/16/32 /130/134/79/132/135/133/143/132/79/134/137 /38/31/32/39 /130/134/79/139/139/133/143/135/79/143/137 /144/127/128/129/110 /112 /8/31/39/33 /130/143/79/132/136/133/132/79/136/132/137 /8/31/38/38 /130/143/79/135/135/133/132/79/135/131/137 /37/31/9/16 /130/143/79/138/131/133/131/79/143/143/137 /37/31/38/37 /130/132/79/143/134/133/131/79/139/138/137 /20/31/9/8 /130/132/79/134/132/133/135/79/139/139/137 /20/31/38/39 /130/132/79/142/141/133/134/79/131/138/137 /9/31/20/8 /130/131/79/136/135/133/139/79/132/139/137 /9/31/38/37 /130/131/79/132/135/133/142/79/143/141/137 /39/31/39/39 /130/131/79/134/141/133/138/79/134/138/137 /140/31/8/9 /130/131/79/138/138/133/141/79/142/136/137 /145/127/128/129/110 /112 /16/31/32/38/33 /130/136/79/142/134/141/133/143/79/132/138/137 /8/31/8/32 /130/136/79/141/143/132/133/143/79/134/135/137 /8/31/39/37 /130/143/79/143/139/133/143/79/141/142/137 /8/31/33/32 /130/143/79/131/139/133/132/79/131/131/137 /37/31/8/140 /130/143/79/139/136/133/132/79/141/134/137 /37/31/9/9 /130/143/79/142/142/133/131/79/135/132/137 /37/31/33/9 /130/143/79/141/131/133/131/79/141/138/137 /20/31/16/140 /130/132/79/136/139/133/135/79/134/142/137 /20/31/39/20 /130/132/79/132/138/133/134/79/135/134/137 /20/31/32/16 /130/132/79/135/142/133/139/79/143/139/137 /125/128/146 /107 /16/31/140/20/39 /130/136/79/135/141/143/133/136/79/138/143/134/137 /16/31/33/140/8 /130/136/79/134/138/138/133/136/79/141/142/138/137 /16/31/32/140/38 /130/136/79/142/135/134/133/143/79/132/134/137 /8/31/8/9 /130/136/79/138/142/131/133/143/79/135/138/137 /8/31/20/38 /130/143/79/136/132/133/143/79/138/142/137 /8/31/39/39 /130/143/79/143/131/133/132/79/143/139/137 /8/31/33/9 /130/143/79/132/135/133/132/79/134/131/137 /8/31/32/140 /130/143/79/131/132/133/132/79/141/136/137 /37/31/37/38 /130/143/79/135/138/133/131/79/134/143/137 /37/31/39/39 /130/143/79/139/132/133/135/79/136/132/137 /144/128/146 /107 /16/31/9/38/140 /130/136/79/131/142/142/133/136/79/139/132/132/137 /16/31/39/38/9 /130/136/79/135/134/131/133/136/79/142/135/142/137 /16/31/33/9/9 /130/136/79/134/142/134/133/136/79/141/134/134/137 /16/31/38/33/140 /130/136/79/139/142/135/133/143/79/143/131/137 /8/31/16/140 /130/136/79/142/141/132/133/143/79/135/135/137 /8/31/8/32 /130/136/79/138/142/142/133/143/79/139/139/137 /8/31/20/9 /130/136/79/141/139/143/133/143/79/141/134/137 /8/31/39/37 /130/143/79/136/132/133/132/79/132/135/137 /8/31/33/38 /130/143/79/143/139/133/132/79/142/131/137 /37/31/16/16 /130/143/79/132/138/133/131/79/143/135/137 /145/128/146 /107 /16/31/20/16/140 /130/136/79/132/131/141/133/136/79/131/138/138/137 /16/31/20/33/8 /130/136/79/132/138/141/133/136/79/135/142/143/137 /16/31/9/33/33 /130/136/79/131/142/143/133/136/79/139/136/141/137 /16/31/39/140/39 /130/136/79/135/131/142/133/136/79/142/132/139/137 /16/31/140/38/33 /130/136/79/134/143/142/133/136/79/141/131/143/137 /16/31/33/33/140 /130/136/79/134/142/134/133/143/79/136/138/137 /16/31/38/33/9 /130/136/79/139/131/131/133/143/79/132/142/137 /16/31/32/32/39 /130/136/79/139/142/135/133/143/79/135/139/137 /8/31/8/38 /130/136/79/142/142/132/133/143/79/138/143/137 /8/31/20/39 /130/136/79/138/134/141/133/132/79/143/136/137 /124/125/128/146 /107 /16/31/8/38/140 /130/136/79/143/135/139/133/136/79/132/131/134/137 /16/31/37/37/32 /130/136/79/143/138/136/133/136/79/132/141/136/137 /16/31/20/16/16 /130/136/79/132/131/134/133/136/79/131/138/143/137 /16/31/20/39/32 /130/136/79/132/138/136/133/136/79/135/134/138/137 /16/31/9/9/16 /130/136/79/131/131/135/133/136/79/134/141/135/137 /16/31/39/16/16 /130/136/79/131/142/131/133/136/79/139/141/131/137 /16/31/39/140/39 /130/136/79/135/143/131/133/136/79/138/132/131/137 /16/31/140/9/38 /130/136/79/135/135/136/133/136/79/141/134/136/137 /16/31/33/33/32 /130/136/79/134/143/136/133/143/79/143/141/137 /16/31/38/32/9 /130/136/79/134/142/132/133/143/79/131/141/137 /125/147/128/146 /107 /16/31/8/16/32 /130/136/79/136/138/139/133/136/79/143/131/139/137 /16/31/8/20/33 /130/136/79/143/136/138/133/136/79/143/142/143/137 /16/31/8/38/37 /130/136/79/143/135/135/133/136/79/132/131/136/137 /16/31/37/37/16 /130/136/79/143/142/131/133/136/79/132/142/141/137 /16/31/37/33/20 /130/136/79/132/136/138/133/136/79/131/139/142/137 /16/31/20/8/8 /130/136/79/132/131/135/133/136/79/135/131/136/137 /16/31/20/39/20 /130/136/79/132/139/136/133/136/79/134/143/134/137 /16/31/9/16/32 /130/136/79/132/142/138/133/136/79/134/141/139/137 /16/31/9/32/38 /130/136/79/131/132/142/133/136/79/142/134/135/137 /16/31/39/33/33 /130/136/79/131/142/136/133/136/79/138/141/132/137 /125/128/148 /108/121 /16/31/16/140/8 /130/136/79/136/135/138/133/136/79/136/142/134/137 /16/31/16/33/38 /130/136/79/136/139/132/133/136/79/136/141/142/137 /16/31/8/16/39 /130/136/79/136/138/131/133/136/79/143/131/132/137 /16/31/8/37/38 /130/136/79/143/136/143/133/136/79/143/139/143/137 /16/31/8/140/16 /130/136/79/143/132/131/133/136/79/132/143/134/137 /16/31/8/38/20 /130/136/79/143/131/141/133/136/79/132/134/131/137 /16/31/37/16/32 /130/136/79/143/134/139/133/136/79/131/136/134/137 /16/31/37/9/9 /130/136/79/143/139/139/133/136/79/131/134/135/137 /16/31/20/16/37 /130/136/79/143/141/138/133/136/79/135/134/134/137 /16/31/20/39/9 /130/136/79/132/132/138/133/136/79/134/135/135/137 /144/128/148 /108/121 /16/31/16/9/9 /130/136/79/136/131/134/133/136/79/136/134/134/137 /16/31/16/39/140 /130/136/79/136/135/134/133/136/79/136/142/136/137 /16/31/16/33/33 /130/136/79/136/139/143/133/136/79/136/141/139/137 /16/31/16/32/9 /130/136/79/136/142/135/133/136/79/143/143/142/137 /16/31/8/8/33 /130/136/79/136/141/136/133/136/79/143/134/142/137 /16/31/8/20/9 /130/136/79/143/136/132/133/136/79/143/138/135/137 /16/31/8/39/20 /130/136/79/143/143/135/133/136/79/132/132/131/137 /16/31/8/33/32 /130/136/79/143/132/132/133/136/79/132/134/141/137 /16/31/37/37/37 /130/136/79/143/135/139/133/136/79/131/131/135/137 /16/31/37/140/8 /130/136/79/143/139/138/133/136/79/135/136/143/137 /147/128/148 /108/121 /16/31/16/20/39 /130/136/79/136/132/138/133/136/79/136/135/135/137 /16/31/16/9/39 /130/136/79/136/131/139/133/136/79/136/134/139/137 /16/31/16/140/37 /130/136/79/136/135/141/133/136/79/136/142/142/137 /16/31/16/33/39 /130/136/79/136/139/136/133/136/79/136/141/135/137 /16/31/16/32/9 /130/136/79/136/142/131/133/136/79/143/132/134/137 /16/31/8/16/33 /130/136/79/136/138/132/133/136/79/143/135/138/137 /16/31/8/37/20 /130/136/79/136/141/132/133/136/79/143/142/141/137 /16/31/8/9/20 /130/136/79/136/141/138/133/136/79/132/136/142/137 /16/31/8/33/38 /130/136/79/143/143/138/133/136/79/132/139/138/137 /16/31/37/8/16 /130/136/79/143/131/134/133/136/79/131/132/143/137 /149/128/148 /108/121 /16/31/16/37/9 /130/136/79/136/143/141/133/136/79/136/131/136/137 /16/31/16/20/8 /130/136/79/136/132/134/133/136/79/136/131/138/137 /16/31/16/9/8 /130/136/79/136/131/131/133/136/79/136/134/143/137 /16/31/16/39/16 /130/136/79/136/135/136/133/136/79/136/139/132/137 /16/31/16/140/37 /130/136/79/136/135/138/133/136/79/136/138/132/137 /16/31/16/33/8 /130/136/79/136/134/135/133/136/79/136/141/142/137 /16/31/16/38/8 /130/136/79/136/139/136/133/136/79/143/143/142/137 /16/31/16/32/9 /130/136/79/136/139/134/133/136/79/143/131/134/137 /16/31/8/8/140 /130/136/79/136/142/142/133/136/79/143/142/131/137 /16/31/8/20/140 /130/136/79/136/138/138/133/136/79/132/136/142/137 /124/127/128/148 /108/121 /16/31/16/37/16 /130/136/79/136/143/139/133/136/79/136/132/135/137 /16/31/16/37/9 /130/136/79/136/132/136/133/136/79/136/131/136/137 /16/31/16/20/37 /130/136/79/136/132/139/133/136/79/136/135/136/137 /16/31/16/20/32 /130/136/79/136/131/143/133/136/79/136/135/138/137 /16/31/16/9/38 /130/136/79/136/131/142/133/136/79/136/139/131/137 /16/31/16/39/9 /130/136/79/136/135/143/133/136/79/136/142/135/137 /16/31/16/140/8 /130/136/79/136/135/139/133/136/79/136/138/138/137 /16/31/16/33/8 /130/136/79/136/135/141/133/136/79/143/136/132/137 /16/31/16/38/33 /130/136/79/136/134/138/133/136/79/143/131/136/137 /16/31/8/16/8 /130/136/79/136/139/139/133/136/79/143/134/135/137 /125/127/128/148 /108/121 /16/31/16/8/9 /130/136/79/136/143/143/133/136/79/136/143/142/137 /16/31/16/8/140 /130/136/79/136/143/131/133/136/79/136/132/136/137 /16/31/16/37/8 /130/136/79/136/143/142/133/136/79/136/132/134/137 /16/31/16/37/9 /130/136/79/136/143/141/133/136/79/136/131/136/137 /16/31/16/37/32 /130/136/79/136/132/132/133/136/79/136/131/142/137 /16/31/16/20/37 /130/136/79/136/132/135/133/136/79/136/135/131/137 /16/31/16/20/140 /130/136/79/136/132/142/133/136/79/136/134/143/137 /16/31/16/9/8 /130/136/79/136/132/138/133/136/79/136/134/138/137 /16/31/16/9/38 /130/136/79/136/131/132/133/136/79/136/142/132/137 /16/31/16/39/39 /130/136/79/136/131/139/133/136/79/136/138/131/137 /144/127/128/148 /108/121 /16/31/16/8/37 /130/136/79/136/136/141/133/136/79/136/143/135/137 /16/31/16/8/20 /130/136/79/136/143/143/133/136/79/136/143/139/137 /16/31/16/8/140 /130/136/79/136/143/131/133/136/79/136/132/136/137 /16/31/16/8/38 /130/136/79/136/143/134/133/136/79/136/132/131/137 /16/31/16/37/37 /130/136/79/136/143/142/133/136/79/136/132/138/137 /16/31/16/37/9 /130/136/79/136/143/138/133/136/79/136/131/132/137 /16/31/16/37/140 /130/136/79/136/132/136/133/136/79/136/131/142/137 /16/31/16/37/32 /130/136/79/136/132/136/133/136/79/136/135/132/137 /16/31/16/20/9 /130/136/79/136/132/131/133/136/79/136/134/136/137 /16/31/16/20/38 /130/136/79/136/132/134/133/136/79/136/134/142/137 /147/126/128/148 /108/121 /16/31/16/8/16 /130/136/79/136/136/138/133/136/79/136/143/132/137 /16/31/16/8/8 /130/136/79/136/136/141/133/136/79/136/143/131/137 /16/31/16/8/20 /130/136/79/136/143/136/133/136/79/136/143/139/137 /16/31/16/8/9 /130/136/79/136/143/132/133/136/79/136/143/138/137 /16/31/16/8/140 /130/136/79/136/143/131/133/136/79/136/132/143/137 /16/31/16/8/38 /130/136/79/136/143/135/133/136/79/136/132/135/137 /16/31/16/37/16 /130/136/79/136/143/134/133/136/79/136/132/142/137 /16/31/16/37/37 /130/136/79/136/143/134/133/136/79/136/131/143/137 /16/31/16/37/9 /130/136/79/136/143/139/133/136/79/136/131/139/137 /16/31/16/37/140 /130/136/79/136/143/142/133/136/79/136/135/136/137 /145/127/128/148 /108/121 /16/31/16/16/38 /130/136/79/136/136/142/133/136/79/136/143/136/137 /16/31/16/16/32 /130/136/79/136/136/138/133/136/79/136/143/143/137 /16/31/16/8/8 /130/136/79/136/136/141/133/136/79/136/143/131/137 /16/31/16/8/37 /130/136/79/136/143/136/133/136/79/136/143/134/137 /16/31/16/8/9 /130/136/79/136/143/143/133/136/79/136/143/138/137 /16/31/16/8/39 /130/136/79/136/143/143/133/136/79/136/132/136/137 /16/31/16/8/140 /130/136/79/136/143/132/133/136/79/136/132/132/137 /16/31/16/8/38 /130/136/79/136/143/132/133/136/79/136/132/134/137 /16/31/16/8/32 /130/136/79/136/143/131/133/136/79/136/132/138/137 /16/31/16/37/16 /130/136/79/136/143/131/133/136/79/136/131/143/137 /143/i255/71 /48/50/49/72/58/72/78/57/78/72/46/69/i255/150/48/50/151/47/50/69/49/83/i255/130/71 /91 /137/i255/50/45/78/72/152/57 /78/50/45/i255/72/69/i255/78/77/72/45/i255/78/57/93/76/50/i255/57/48/50/i255/93/57/45/50/74/i255/46/69/i255/150/48/50/151/47/50/69/49/83/i255/57/69/57/76/83/45/72/45/i255/46/150/i255/58/57/48/78/72/57/76/i255/74/47/48/57/78/72/46/69/i255/45/50/48/72/50/45/i255/130/71 /85 /53 /137/79 /88 /47/152/93 /50/48/45/i255/72/69/i255/58/57/48/50/69/78/77/50/45/72/45/i255/57/48/50/i255/71 /91 /i255/50/45/78/72/152/57 /78/50/45/i255/57/78/i255/76/46/153 /50/48/i255/57/69/74/i255/47/58/58/50/48/i255/93/46/47/69/74/45/i255/46/150/i255/78/77/50/i255/141/136/154/i255 /49/46/69/150/72/74/50/69/49/50/i255/72/69/78/50/48/75/57/76/79/i255/82 /77/50/i255/58/48/46/93/57/93/72/76/72/78/83/i255/78/77/57/78/i255/58/48/50/49/72/58/72/78/57/78/72/46/69/i255/150/48/50/151/47/50/69/49/83/i255/50/45/78/72/152/57 /78/50/45/i255/130/150/46/48 /57/i255/90/72/75/50/69/i255/74/47/48/57/78/72/46/69/i255/57/69/74/i255/57/75/50/48/57/90/50/i255/48/50/49/47/48/48/50/69/49/50/i255/72/69/78/50/48/75/57/76/137/i255/153 /72/76/76/i255/93/50/i255/90/48/50/57/78/50/48/i255/78/77/57/69/i255/78/77/50/i255/47/58/58/50/48/i255/93/46/47/69/74/i255/130/46/48/i255/76/50/45/45/i255/78/77/57/69/i255/78/77/50/i255/76/46/153 /50/48/i255/93/46/47/69/74/137/i255/72/45/i255/134/154/79 /i255/52 /45/78/72/152/57 /78/50/45/i255/57/78/i255/47/58/58/50/48/i255/93/46/47/69/74/45/i255/57/48/50/i255/69/46/78 /49/77/50/49/84/50/74/i255/57/90/57/72/69/45/78/i255/58/48/46/93/57/93/76/50/i255/152/57 /155/72/152/47 /152/i255 /58/48/50/49/72/58/72/78/57/78/72/46/69/i255/130/71 /56/71 /137/i255/50/45/78/72/152/57 /78/50/45/i255/57/69/74/i255/152/57 /83/i255/93/50/i255/77/72/90/77/50/48/i255/78/77/57/69/i255/49/47/48/48/50/69/78/76/83/i255/75/57/76/72/74/i255/71 /56/71 /i255/75/57/76/47/50/45/79 /71 /76/50/57/45/50/i255/48/50/150/50/48/i255/78/46/i255/88 /86/89 /89 /i255/89 /78/76/57/45/i255/143/135/i255/74/46/49/47/152/50 /69/78/i255/150/46/48/i255/152/46 /48/50/i255/72/69/150/46/48/152/57 /78/72/46/69/79 /156 /57/49/84/i255/78/46/i255/82/46/58 /61 /65 /i255/35 /17/6/97 /100 /18/22/6/5 /139/157/132/134/157/132/139/73/i255/132/51/136/131/i255/71 /56/71/48/50/49/72/58/72/78/57/78/72/46/69/i255/91 /48/50/151/47/50/69/49/83/i255/85 /57/78/57/i255/53 /50/48/75/50/48 /77/78/78/58/45/51/157/157/77/74/45/49/79/69/153 /45/79/69/46/57/57/79/90/46/75/157/58/150/74/45/157/58/150/74/45/92/58/48/72/69/78/58/57/90/50/79/77/78/152/76 /158/76/57/78/159/135/143/79/141/136/142/142/95 /76/46/69/159/160/142/132/79/142/138/138/134/95 /74/57/78/57/159/72/69/78/50/69/45/72/78/83/95 /47/69/72/78/45/159/50/69/90/76/72/45/77/95 /45/50/48/72/50/45/159/58/74/45/143/157/135
Page 279
/0 /1/2/3/i255/5/6/i255/7/6/8 /9/10 /11 /12/i255/14 /i255/10/15/16/17/10/18/12 /19 /20/10 /18/18/i255/12/21/10/18/15/i255/22/15/16/16/10/17/23 /24/25/26/27/25/26/24/28/i255/26/29/30/31/i255/32 /33/32/34/35/2/36/8/36/5/1/5/36/6/37/i255/38 /34/35/39/40/35/37/2/41/i255/42 /1/5/1/i255/43 /35/34/44/35/34 /45/5/5/8/46/29/25/25/45/47/46/2/48/37/49 /46/48/37/6/1/1/48/50/6/44/25/8/51/47/46/25/8/51/47/46/52/8/34/36/37/5/8/1/50/35/48/45/5/53/54 /55/54/1/5/56/57/58/48/59/30/60/60/61 /54/6/37/56/62/60/26/48/60/63/63/27/61 /47/1/5/1/56/36/37/5/35/37/46/36/5/41/61 /40/37/36/5/46/56/35/37/50/54/36/46/45/61 /46/35/34/36/35/46/56/8/47/46/26/25/57
Page 280
/0 /1/2/3 /4/i255/6/7/1/8/4/i255/9/4/2/2/1/10/11 /0 /1/2/3 /4/i255/6/7/1/8/4/i255/12/1 /13 /0 /1/2/3 /4/i255/6/7/1/8/4/i255/1/4/2/10/1/8 /14 /15 /16/17/12 /18/12/10 /14 /15 /19/20/20/17/12 /21/20/12/10 /14 /15 /19/20/20/17/12 /21/20/12/10 /22/23/24/25/23/24/22/26/i255/24/28/29/30/i255/31 /32/31/33/34/35/36/37/36/38/39/38/36/40/41/i255/42 /33/34/43/44/34/41/35/45/i255/46 /39/38/39/i255/47 /34/33/48/34/33 /49/38/38/37/50/28/23/23/49/51/50/35/52/41/53 /50/52/41/40/39/39/52/54/40/48/23/37/55/51/50/23/37/55/51/50/56/37/33/36/41/38/37/39/54/34/52/49/38/57/58 /59/58/39/38/60/61/62/52/63/29/64/64/65 /58/40/41/60/66/64/24/52/64/67/67/25/65 /51/39/38/39/60/36/41/38/34/41/50/36/38/45/65 /44/41/36/38/50/60/34/41/54/58/36/50/49/65 /50/34/33/36/34/50/60/37/51/50/30/23/61
Page 281
/0 /1/2/3/i255/5/6/i255/7/6/8 /9 /10 /i255/11 /12/8/1/13/5/14/12 /15/5/i255/6/16/i255/17 /6/14/14/12 /13/2/12 /18 /1/5/19/6/15/1/20/i255/21/2 /12/1/15/19/2/i255/1/15/22/i255/23 /5/14/6 /24/8/25/12/13/19/2/i255/23 /22/14/19 /15/19/24/5/13/1/5/19/6/15 /18 /1/5/19/6/15/1/20/i255/26/12 /1/5/25/12/13/i255/10 /12/13/27/19/2/12 /18 /1/5/19/6/15/1/20/i255/26/1 /5/12/13/i255/17 /12/15/5/12/13 /28/29/30/31 /i255/32 /1/24/5/i255/26/12 /24/5/i255/33 /19/34/25/35 /1/36 /10 /19/20/27/12/13/i255/10 /8/13/19/15/34/37/i255/38/11 /i255/30/39/40/28/39 /41/42 /12/24/5/19/6/15/24/43/44/i255/33 /11 /10 /17 /45/41/42 /12/24/5/19/6/15/24/46/15 /6/1/1/45/34/6/27 /11 /19/24/2/20/1/19/14/12 /13 /47 /48 /49/50/50/51/52 /53/50/52/54 /55/56/30/31 /56/30/55/37/i255/30/44/39/29/i255/57 /38/57/13/12/2/19/8/19/5/1/5/19/6/15/i255/58 /13/12/59/42/12/15/2/36/i255/11 /1/5/1/i255/10 /12/13/27/12/13 /25/5/5/8/24/44/56/56/25/22/24/2/45/15/35 /24/45/15/6/1/1/45/34/6/27/56/8/16/22/24/56/8/16/22/24/60/8/13/19/15/5/8/1/34/12/45/25/5/14/20 /43/20/1/5/61/62/28/45/40/39/63/63/64 /20/6/15/61/65/63/30/45/63/66/66/31 /64 /22/1/5/1/61/19/15/5/12/15/24/19/5/36/64 /42/15/19/5/24/61/12/15/34/20/19/24/25/64 /24/12/13/19/12/24/61/8/22/24/62/56/62
Page 282
Page 283
Page 284
Page 285
Page 286
Page 287
Page 288
Page 289
Page 290
Page 291
Page 292
Page 293
Page 294
Page 295
Page 296
Page 297
Page 298
Page 299
Page 300
Page 301
Page 302
Page 303
Page 304
Page 305
Page 306
Page 307
Page 308
Page 309
Page 310
Page 311
Page 312
Page 313
Page 314
Page 315
Page 316
Page 317
Page 318
Page 319
Page 320
Page 321
Page 322
Page 323
Page 324
Page 325
Page 326
Page 327
Page 328
Page 329
Page 330
Page 331
Page 332
Page 333
Page 334
Page 335
Page 336
Page 337
Page 338
Page 339
Page 340
Page 341
S
S
S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
WG
WG
WG
WG
WG
S
WG
GG
WG
S
W
S
WG
S
S
GG
S
?
EE
WG
SEE NOTE #3
LINE
PROPERTY
FORMER
2622
CL&P
2623
CL&P
234
CL&P
3572
CL&P
4362
SNET
235
CL&P
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
C
C
C
FLAG POLE
D
G
A
TE
GRAVEL DRIVE
CONC. WALK
CONC. WALK
connection (typ.)
access/roadway
Possible future
connection (typ.)
access/roadway
Possible future
Total 24 Apartments 3 Story
BUILDING #4
Mixed Use Retail/Medical Office
Total 15,000 Square Feet 1 Story
BUILDING #2 30
40
13A
Total 24 Apartments
3 Story
BUILDING #5
50
Total 24 Apartments 3 StoryBUILDING #6
70
Signal
Traffic
VE
DR
IVE
W
A
Y
DRIVE
SAX
TO
N
B
R
OOK
DR.
ROAD
C
IRCLE
K
N
O
L
LW
O
O
D
C
E
N
T
E
R
-
W
O
O
D
R
D
.
WILLARD
GORDON
ST.
ST.
ELY
LANE
Saxton
Hoskins
ROAD
WESCOTT
ROAD
Brook
R
IVE
R
S
T
A
T
E
O
F
C
O
N
N
E
C
T
IC
U
T
315
W
E
S
T
WE
K
IL
BO
U
R
N
HO
W
A
R
D
S
T
.
R
D
.
(I
NA
C
T
IV
E
)
HOSKINS
SIMSBURY
AIRPORT
TULLER
DR.
WOLC
O
TT
SIMSBURY PINES
L
AU
R
IE
-
J
O
E
W
AY
47.02
47.45
47.54
47.93
48.04
48.21
0.85
0.92
1.04
1.3
EGDIRBRETSAC GNISSORC
TESROD CROSSING
S
T
R
E
E
T
47.61
47.71
DATE DESCRIPTION
PROFESSIONAL SEAL
SHEET
DATE
REVISED
4/30/26
6/26/26
OFCONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
1 6
REVISION SUMMARY
PREPARED FOR
SCALE: 1" = 40'
PROJECT NUMBER:
00222 - 001
40 0 40 80 120
DIAMOND SPARKLE CAR WASH LLC
359 LEBANON AVENUE
COLCHESTER, CT 06415
DORSET CROSSING LLC
30 DORSET CROSSING
SIMSBURY, CT 06070
SIMSBURY, CT
DORSET CROSSING PAD
MASTER DEVELOPMENT PLAN
PREPARED FOR
DIAMOND SPARKLE CAR WASH LLC, APPLICANT
TITLE SHEET
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)
DORSET CROSSING DRIVEMAP REFERENCES:
HO
P
M
E
ADO
W
S
T
R
EET
(C
T
R
OU
TE
10
&
202
)
BUILDING #1
CAR WASH
TOTAL 7,275 SF±
1 STORY
LOT A
67 SPACES
LOT F
LOT H
148 SPACES
INDEX OF SHEETS
TITLE SHEET 01
MASTER DEVELOPMENT PLAN
SCALE: 1" = 1000'
APPLICANT OWNER
SCALE: 1" = 1000'
ZONING LOCATION MAP
SITE LOCATION MAP
DESCRIPTION SHEET NUMBER
DEVELOPMENT LAYOUT PLAN - LOT F 02
GRADING & DRAINAGE PLAN 03
UTILITY PLAN 04
LIGHTING PLAN 05
EROSION & SEDIMENTATION CONTROL PLAN 06
DORSET CROSSING PAD
SITE MODIFICATION - LOT F
10 DORSET CROSSING (M/B/L I04/403/13C-F)
SIMSBURY, CONNECTICUT
LOT F
SITE
(HATCHED)
NDDB AREA
APA LIMIT
PAD
SITE
10
TOWN ROAD MAP OBTAINED FROM THE CONNECTICUT DEPARTMENT OF TRANSPORTATION DATABASE.4.
ADMINISTRATION (NOAA) OF THE US DEPARTMENT OF COMMERCE DATABASE.
ELEVATION DATA OBTAINED FROM MAP REFERENCE 1 AND NATIONAL OCEANIC AND ATMOSPHERIC3.
ORTHOIMAGERY SPRING 2025 FROM NEARMAP.2.
HESKETH & ASSOCIATES, INC.
DATE: 09-16-2011 AS REVISED THROUGH 10/10/11, SCALE: 1" = 40', SHEET UT-1, PREPARED BY F.A.
"UTILITY PLAN PREPARED FOR DORSET CROSSING, HOWMEADOW STREET, SIMSBURY, CONNECTICUT"2.
09-22-2023, SCALE: 1" = 100', PREPARED BY F.A. HESKETH & ASSOCIATES, INC.
DORSET CROSSING DRIVE, SIMSBURY, CONNECTICUT", DATE: 12-03-2021 AS REVISED THROUGH
"DORSET CROSSING PAD, MASTER DEVELOPMENT PLAN PREPARED FOR DORSET CROSSING, LLC,1.
16 SPACES
Page 342
S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
WG
S
S
GG
S
?
2622
CL&P
2623
CL&P
234
CL&P
3572
CL&P
4362
SNET
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
E
E
C
C
T
FLAG POLE
D
CONC. WALK
SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE: 1" = 20'
PROJECT NUMBER:
00222 - 001
20 0 20 40 60
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION
SHEET
DATE
REVISED
4/30/26
6/26/26
OF 2 6
REVISION SUMMARY
DORSET CROSSING PAD
MASTER DEVELOPMENT PLAN
PREPARED FOR
DIAMOND SPARKLE CAR WASH LLC, APPLICANT
DEVELOPMENT LAYOUT PLAN - LOT F
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)
LP
LP
L
P
L
P
LP
LP
L
P
L
P
LP
LP
LP
LP
LP
VAC
VAC
VAC
VAC
H
O
P
M
E
A
D
O
W
S
T
R
E
E
T
(C
T
R
O
U
T
E
10 &
202)
DORSET CROSSING DRIVE
V
A
C
V
A
C
V
A
C
V
A
C
V
A
C
V
A
C
V
A
C
EQUIPMENT
OFFICE
AUTOMATIC TUNNEL
TOUCHLESS
SELF 1
SELF 2
PLANNED AREA DEVELOPMENT (PAD)ZONE:
CAR WASHUSE:
50.6' SY
MATCH APPROVED
PARKING/DRIVE SETBACK
5'
10'
MATCH APPROVED
PARKING/DRIVE SETBACK
21.8' R
Y
AND ACCESS PLAN HAS BEEN APPROVED.
PARKING SIDE AND REAR YARD SETBACKS MAY BE REDUCED TO 0 FEET WHERE A UNIFIED PARKING2.
APPROVED INFORMATION OBTAINED FROM MAP REFERENCE 1, SHEET MA-1.1.
ZONING NOTES:
10'
10'
10'
45'-0"
25'-4"
25'-4"
38'-0"
11'-4"
24'-0"
70'-0"
6'-0"
22'-0"
10'-0"
45'-0" 30'-0"
26'-0"
19'-0"
15'-0"
11'-4"
14'-8"
22'-0"
2'-0"
6'-0"
COMPLIES< 40 FTUNKNOWN40 FTBLDG. HEIGHT
REDUCTION35,426 SF40,000 SFN/AIMP. COVERAGE
INCREASE7,275 SF7,000 SFN/ABLDG. COVERAGE
REDUCTION7,275 SF12,000 SFN/ABLDG. AREA
NO CHANGE5 FT5 FT10 FTREAR YARD[2]
NO CHANGE5 FT5 FT10 FTSIDE YARD[2]
NO CHANGE10 FT10 FT10 FTFRONT YARD
PARKING SETBACKS
COMPLIES21.8 FT±21.1 FT±20 FTREAR YARD
N/AN/AN/A10 FTACCESSORY
COMPLIES50.6 FT±9.0 FT±20 FTPRINCIPAL
SIDE YARD
COMPLIES23.7 FT±20 FTCANOPY
COMPLIES60.8 FT±20.0 FT±20 FTBUILDING
FRONT YARD
NO CHANGE460.7 FT±460.7 FT±100 FTLOT FRONTAGE
NO CHANGE47,419 SF (1.08 AC)47,419 SF (1.08 AC)10,000 SFLOT AREA
NOTESPROPOSEDAPPROVED[1]REQUIREDITEM
2'
PARKING/DRIVE SETBACK
5.67'
10'
10'
10'
10'
10'
10'
10'
10'
16'
16'
62.4' SY
60.8' F
Y
M
A
IN
B
U
IL
D
IN
G
A
B
C
D
E
F
G
H
I
J
LEGEND
K
L
Mixed Use Retail/Medical Office
Total 15,000 Square Feet
1 Story
BUILDING #2
CONNECTION (TYP.)
ACCESS/ROADWAY
POSSIBLE FUTURE
A
24'
18'
18'
13'
15'
13'
21.33'
13'
A
A
A
A
21.33' A
A
2'
18'
B
B
B
C
D
G
G
G
G
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
G
G
H
I
J
TRASH ENCLOSURE
STOP SIGN
HANDICAP PARKING SIGN
HANDICAP RAMP (8.33% MAX.)
CONCRETE SIDEWALK
CONCRETE CURB & WALK MONO.
EXT. CONCRETE CURB (START/END)
BIT. CONCRETE CURB (START/END)
STOP BAR (12" WHITE)
LANE STRIPING (4" WHITE)
PARKING PAINT STRIPING (4" WHITE)
BITUMINOUS CONCRETE DRIVE
K
L
E
X
IS
T
IN
G
D
R
IV
E
W
A
Y
AREA = 750 SF±
CANOPY LIMITS
PAY STATION
LIGHT FIXTURE (TYP. OF 12)
15' HIGH POLE MOUNTED
EXISTING LIGHT FIXTURE (TYP.)
HANDICAP PARKING MARKING
WALL PACK (FULL CUTOFF)
POLE MOUNTED LIGHT FIXTURE
HAYBALE
SILT FENCE
TELECOMMUNICATIONS
ELECTRIC
GAS SERVICE
WATER
SANITARY SEWER
CURTAIN/SLOPE/WALL DRAIN
ROOF LEADER
DRAINAGE PIPE
CONCRETE WALK & CURB MONO.
CONCRETE WALK
SAWCUT PAVEMENT
EDGE OF PAVEMENT W/ CURB
14'-8"
4'-0"
DETAIL
DRAINAGE EASEMENT
EASEMENT
EASEMENT
FAVOR OF CL&P
EASEMENT IN
OF AQUARION
EASEMENT IN FAVOR
TOWN OF SIMSBURY
EASEMENT IN FAVOR OF
8'
8'
9'
9'
9'
13'
A
A
5 S
P
A
C
E
S
(V
A
C
.)
4 SPACES (VAC.)
18'
COMPLIES1 SP (1 VAN)1 SP (1 VAN)161 SP / 1-25 SPDEVELOPMENT TOTAL
ACCESSIBLE PARKING
COMPLIES16 SPACES5 SPACESTOTAL
11 SPACESN/AN/AN/APATRONS / VACUUM
3 SPACES3 SPACES31 SP / EMP.CAR WASH
2 SPACES2 SPACES2722.5 SP / 500 SFOFFICE
PARKING SPACES
NOTESPROPOSEDREQUIREDUNITSTANDARDITEM
GENERAL SITE NOTES
ACCESSIBLITY REQUIREMENTS.
CONTRACTOR TO CONFIRM WITH LOCAL CODES AND BUILDING INSPECTOR FOR SPECIFIC HANDICAPPED10.
COMPACTION.
GRANULAR BACKFILL. REFER TO GEOTECHNICAL REPORT FOR TYPE OF FILL TO ACHIEVE DESIRED
CONTRACTOR SHALL COMPLETELY FILL ALL TRENCHES WITHIN 5 FEET OF PAVEMENT EDGES WITH9.
TO THE OWNER.
CONSTRUCTION BY THE CONTRACTOR, HIS SUBCONTRACTORS OR SUPPLIERS AT NO ADDITIONAL COST
CONTRACTOR SHALL REPAIR, RESURFACE, RECONSTRUCT OR REFURBISH ANY AREAS DAMAGED DURING8.
ASPHALT.
WITH FORM 819, TOWN OF SIMSBURY OR DOT STANDARDS WHERE NEW ASPHALT JOINS EXISTING
CONTRACTOR SHALL SEAL EDGE OF EXISTING ASPHALT PAVEMENT WITH TACK COAT IN ACCORDANCE7.
PROJECT LANDSCAPE ARCHITECT.
SEED SHALL BE APPLIED AT THE MINIMUM RATE RECOMMENDED BY THE MANUFACTURER OR THE
CONTRACTOR SHALL SUPPLY AND PLACE STRAW MULCH WHEREVER GRASS SEED HAS BEEN PLACED.6.
1" BELOW TOPS OF CURBS, WALKS, OR PAVEMENT ELEVATIONS WHERE TOPSOIL ABUTS THOSE AREAS.
OR AS DIRECTED BY THE PROJECT LANDSCAPE ARCHITECT. TOP OF TOPSOIL LAYER SHALL BE PLACED
OTHERWISE NOTED. ALL NEW SEEDED OR SODDED AREAS SHALL HAVE A TOPSOIL LAYER OF 4" MINIMUM
ALL DISTURBED AREAS SHALL BE SEEDED OR SODDED AFTER FINISH GRADING IS COMPLETED UNLESS5.
FEATURES AS NECESSARY.
CONTRACTOR SHALL PROVIDE SMOOTH TRANSITIONS FROM PROPOSED FEATURES TO EXISTING4.
REPRESENTATIVE IMMEDIATELY.
DISCREPANCIES BETWEEN THE PLANS AND ACTUAL FIELD CONDITIONS TO THE OWNER OR OWNER'S
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS AND SHALL REPORT ANY
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO THE START OF CONSTRUCTION.3.
OR OTHER LIMITS AS DEPICTED ON THE PLAN.
ALL DIMENSIONS ARE TO THE EDGE OF PAVEMENT, FACE OF CURBS, OUTSIDE FACE OF THE BUILDING2.
CONSTRUCTION FORM 819 AS APPLICABLE AND THE TOWN OF SIMSBURY STANDARD SPECIFICATIONS.
TRANSPORTATION STANDARD SPECIFICATIONS FOR ROADS, BRIDGES, FACILITIES AND INCIDENTAL
ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE STATE OF CONNECTICUT DEPARTMENT OF1.
23.7' F
Y
C
A
N
O
P
Y
63.0' F
Y
M
A
IN
B
U
IL
D
IN
G
18'
24'
15.5'
F
H
5'
4'
10'
FF = 201.50
AREA = 7,275 SF±
CAR WASH
1 STORY
BUILDING #1
DESIGN BY OTHERS
MONUMENT SIGN
DIAMOND SPARKLE
ZONING TABLE LOT F
PARKING TABLE LOT F
PARKING SPACE REQUIREMENTS PER SECTION 10.2.4USE:
6 S
P
A
C
E
S
(2 V
A
C
. / 1 H
A
V
A
N
)
(TYP. OF 6)
MOUNT VACUUM
DUAL HEAD POSTPage 343
S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
WG
S
S
GG
S
?
2622
CL&P
2623
CL&P
234
CL&P
3572
CL&P
4362
SNET
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
E
E
C
C
T
FLAG POLE
D
CONC. WALK
SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE: 1" = 20'
PROJECT NUMBER:
00222 - 001
20 0 20 40 60
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION
SHEET
DATE
REVISED
5/18/26
6/26/26
OF 3 6
REVISION SUMMARY
DORSET CROSSING PAD
MASTER DEVELOPMENT PLAN
PREPARED FOR
DIAMOND SPARKLE CAR WASH LLC, APPLICANT
GRADING & DRAINAGE PLAN
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)
+201.50
+
201.50
+201.25
+
201.25
+200.60
+201.10
+201.20
+
201.50
+
201.80
+200.50
+
201.05
+201.20
+200.10
+ 199.20
+200.70
+
200.75
+
201.20
+
201.25
+200.55
+200.10
+
201.05
+
200.50
+
200.50
+
199.20
+
200.80
+
200.80
+
200.80
+200.85
+
201.60
+
202.00
+
202.00
198
200
200
198
200
200
200
202
201
201
201
202
201
LP
L
P
L
P
LP
LP
L
P
L
P
LP
LP
LP
LP
LP
H
O
P
M
E
A
D
O
W
S
T
R
E
E
T
(C
T
R
O
U
T
E
10 &
202)
DORSET CROSSING DRIVE
Mixed Use Retail/Medical Office
Total 15,000 Square Feet
1 Story
BUILDING #2
CONNECTION (TYP.)
ACCESS/ROADWAY
POSSIBLE FUTURE
DRAINAGE EASEMENT
EASEMENT
FAVOR OF CL&P
EASEMENT IN
OF AQUARION
EASEMENT IN FAVOR
TOWN OF SIMSBURY
EASEMENT IN FAVOR OF
FL = 193.65 (8")
TF = 202.94
EX. SMH
FL = 187.40 (8")
TF = 198.49
EX. SMH
250' - 8" P
V
C
@
0.025
FF = 201.50
CAR WASH
1 STORY
BUILDING #1
UTILITY STATEMENT
4455, IN ACCORDANCE WITH CBYD NOTIFICATION PROCEDURES PRIOR TO COMMENCING WORK.
AUTHORITIES PRIOR TO CONSTRUCTION. CONTRACTOR TO NOTIFY "CALL BEFORE YOU DIG" AT 1-800-922-
EXISTENCE OF ALL SUCH FEATURES MUST BE FIELD DETERMINED AND VERIFIED BY THE APPROPRIATE
IN NATURE. ADDITIONALLY, OTHER SUCH FEATURES MAY EXIST ON THE SITE. THE SIZE, LOCATION AND
IN THE AREA, EITHER IN-SERVICE OR ABANDONED. THESE LOCATIONS MUST BE CONSIDERED APPROXIMATE
THIS PLAN SET MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES COMPRISE ALL SUCH UTILITIES
GOVERNMENT AGENCIES, PAROLE TESTIMONY, FIELD SURVEY AND OTHER SOURCES. THE SURVEYOR AND
COMPILED, IN PART, FROM RECORD MAPPING SUPPLIED BY THE RESPECTED UTILITY COMPANIES OR
UNDERGROUND UTILITY, STRUCTURE AND FACILITY LOCATIONS DEPICTED AND NOTED HEREON HAVE BEEN
STUBS PER MAP REF. 2 (VIF)
EXISTING 6" FIRE & 4" DOMESTIC
EXISTING GAS VALVE (VIF)
T
FL(NE) = 196.25 (NEW)
FL(W) = 196.25 (EX.)
TF = 199.10 (NEW)
TF = 198.37 (EX.)
EX. CB-C #F-100
FL(E) = 187.65 (EX.)
TF = 200.70 (NEW)
TF = 201.37 (EX.)
EX. SMH #F-200
FL(W) = 196.32 (EX.)
TF = 200.50 (NEW)
TF = 200.91 (EX.)
EX. CB-C #F-204
FL(S) = 190.88 (EX.)
TF = 201.05 (NEW)
TF = 201.97 (EX.)
EX. SMH #F-201
FL(N) = 190.74 (EX.)
FL(SW) = 191.19 (EX.)
FL(SE) = 190.70 (EX.)
FL(NE) = 196.03 (EX.)
TF = 201.20 (NEW)
TF = 201.88 (EX.)
EX. SMH #F-203
FL(NE) = 191.61 (EX.)
FL(W) = 191.60 (EX.)
TF = 200.10 (NEW)
TF = 200.70 (EX.)
EX. CB-C #F-205
FL(E) = 192.12 (EX.)
FL(S) = 192.09 (EX.)
TF = 199.10 (NEW)
TF = 200.67 (EX.)
EX. CB-C #F-206
@ 0.6%
26 LF - 12" HDPE
FL = 196.40
TF = 199.65
PR. DMH #F-101
@ 0.7%
22 LF - 8" HDPE
FL(E) = 193.80 (24")
FL(W) = 196.55 (12")
TF = 200.05
PR. DMH #F-103
@ 0.9%
110 LF - 12" HDPE
FL(W) = 193.80 (24")
FL(N) = 196.55 (8")
TF = 199.75
PR. DMH #F-104
FL = 197.90 (8")
TF = 200.90
PR. YD #F-106
@ 1.0%
65 LF - 8" HDPE
FL = 197.25 (8")
TF = 200.25
PR. YD #F-105
@ 2.5%
28 LF - 8" HDPE
@ 0.5%
40 LF - 8" HDPE
FL(SE) = 197.80 (NEW)
FL(W) = 197.60 (EX.)
FL(NE) = 197.79 (EX.)
TF = 202.01 (EX.)
EX. CB-C #F-300
FL(N) = 190.73 (EX.)
FL(S) = 190.76 (EX.)
TF = 201.10 (NEW)
TF = 202.01 (EX.)
CONTECH STC 900
EX. STS #F-202
GRADING NOTES
FLOW LINE ELEVATIONS GIVEN AT END OF PIPE SECTIONS.10.
ON THE PLANS.
SEE APPROPRIATE DETAILS TO DETERMINE SUBGRADE ELEVATIONS BELOW FINISH GRADE INDICATED9.
ALL PROPOSED SPOT ELEVATIONS ARE THE FINAL PAVEMENT AND FINAL GRADE ELEVATIONS.8.
AND CORRECT IF ANY, "BIRD BATH" CONDITIONS.
PROVIDE POSITIVE DRAINAGE WITHOUT PONDING. AFTER INSTALLATION, CONTRACTOR TO TEST FOR,7.
PARKING AREAS WILL BE DETERMINED AT THE TIME OF CONSTRUCTION.
NECESSITY FOR SUBDRAINS AND/OR REMOVAL OF ANY UNSUITABLE MATERIAL WITHIN THE PROPOSED
WEIGHT ROLLER TO DETERMINE LOCATIONS OF ANY POCKETS OF UNSUITABLE MATERIAL. THE
AFTER REMOVING PAVEMENT AND/OR STRIPPING TOPSOIL MATERIAL, PROOFROLL WITH A MEDIUM6.
GRANULAR MATERIAL IF WITHIN 5 FEET OF PAVEMENT OR CONCRETE.
TRENCHES FOR ALL STORM DRAIN LINES SHALL BE BACKFILLED COMPLETELY WITH ENGINEERED5.
CONSTRUCTION.
NOTIFY THE UTILITY COMPANY SO A REPRESENTATIVE IS PRESENT TO INSTRUCT AND OBSERVE DURING
COMPANIES. WHEN EXCAVATING IS AROUND OR OVER EXISTING UTILITIES, THE CONTRACTOR MUST
ON SITE. ALL VERIFICATIONS (LOCATION, SIZE AND DEPTH) SHALL BE MADE BY THE APPROPRIATE UTILITY
START, OR AS REQUIRED BY GOVERNING UTILITY COMPANY, TO VERIFY IF ANY UTILITIES ARE PRESENT
THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES 72 HOURS BEFORE CONSTRUCTION IS TO4.
AND/OR COMPANIES SO AS NOT TO CAUSE DAMAGE.
EXISTING UTILITY LINES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTORS
THE EXCAVATING CONTRACTOR SHALL TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND3.
REPRESENTATIVE IMMEDIATELY.
DISCREPANCIES BETWEEN THE PLANS AND ACTUAL FIELD CONDITIONS TO THE OWNER OR OWNER'S
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS AND SHALL REPORT ANY
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO THE START OF CONSTRUCTION.2.
BE PERFORMED IN ACCORDANCE WITH THE TOWN OF SIMSBURY STANDARD SPECIFICATIONS.
CONSTRUCTION FORM 819 AS APPLICABLE. WORK WITHIN THE DORSET CROSSING RIGHT-OF-WAY SHALL
TRANSPORTATION STANDARD SPECIFICATIONS FOR ROADS, BRIDGES, FACILITIES AND INCIDENTAL
ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE STATE OF CONNECTICUT DEPARTMENT OF1.
DRAINAGE
STORMWATER O & M
BOTTOM STONE = 192.90±
BOTTOM CHAMBERS = 193.65±
16 CHAMBERS (2 ROWS X 8 UNITS)
SUBSURFACE INFILTRATION SYSTEM
PROPOSED STORMTECH MC-3500
TOP CHAMBERS = 192.29±
BOTTOM CHAMBERS = 187.02±
48 MODULES (4 ROWS X 12 UNITS)
SYSTEM WITH DURA-SKRIM LINER
EXISTING 'RETAIN IT' DETENTION
RL FL = 199.80
RL FL = 199.80
LEADER @ 1.0% (TYP.)
190 LF PVC ROOF
FL(E) = 197.06
FL(W) = 197.01
TF = 201.86
EX. CB-C
FL(SE & NW) = 197.54
FL(N) = 199.23
TF = 202.17
EX. CB-C
FL = 196.13
TF = 199.22
EX. CB-C
FL(W) = 195.74
FL(N) = 195.76
TF = 198.99
EX. CB-C
FL(N) = 192.29
TF = 196.09
EX. CB-C
FL(N) = 192.11
FL(S) = 192.22
TF = 196.01
EX. CB-C
FL = 198.28
TF = 201.04
EX. CB-C
EASEMENT
FL = 197.35
TF = 200.50
48" SUMP W/ HOOD
PR. CB-CL #F-102
FL = 198.00
TF = 200.85
48" SUMP W/ HOOD
PR. CB-CL #F-301
E
X
IS
T
IN
G
D
R
IV
E
W
A
Y
MANUFACTURER'S RECOMMENDATIONS.
STORMTECH MC-3500 UNITS TO BE INSPECTED AND MAINTAINED IN ACCORDANCE WITH THED.
REMOVE SAND, SALT AND OTHER DEBRIS FROM THE WINTER MAINTENANCE SEASON.
ACCESS DRIVES, PARKING AREAS AND SIDEWALKS SHALL BE SWEPT ANNUALLY EACH SPRING TOC.
DIVERTS FLOW SHALL BE REMOVED AND DISPOSED OF IN AN APPROVED MANNER.
FOLIAGE CLEANUP AND A SECOND TIME DURING SPRING CLEANUP. ALL DEBRIS THAT OBSTRUCTS OR
INSPECT EACH VEGETATED/LANDSCAPED AREA TWICE ANNUALLY, ONCE IN THE FALL AS PART OFB.
IN AN APPROVED MANNER.
FOLLOWING THE WINTER SEASON. REMOVE ALL COLLECTED SEDIMENT AND DEBRIS AND DISPOSE OF
INSPECT EACH CATCH BASIN AND STORMWATER TREATMENT STRUCTURE ANNUALLY IN THE SPRINGA.
THE FOLLOWING MAINTENANCE SHALL BE PERFORMED AND A MAINTENANCE LOG COMPLETED.2.
OWNER & PARTY RESPONSIBLE FOR OPERATION AND MAINTENANCE: DIAMOND SPARKLE CAR WASH, LLC1.
MANAGEMENT SYSTEMS FUNCTION AS DESIGNED.
THE FOLLOWING OPERATION & MAINTENANCE PLAN SHALL BE IMPLEMENTED TO ENSURE THAT STORMWATER
LEADER @ 1.0% (TYP.)
165 LF PVC ROOF
FL = 194.15
6" INSERTA TEE
ACCORDANCE WITH THE 2024 STORMWATER QUALITY MANUAL.
TREATMENT HAS BEEN DESIGN AND IMPLEMENTED TO THE MAXIMUM EXTENT ACHIEVABLE INF.
BEEN INSTALLED, AND NO OTHER PRETREATMENT BMP'S ARE FEASIBLE.
CONNECTED TO A DOWNSTREAM SYSTEM WHERE OTHER TREATMENT PRACTICES HAVE ALREADY
A CONTRIBUTING DRAINAGE AREA OF 0.16 ACRES (<0.25), IS IN AN OFFLINE CONFIGURATION, IS
CATCH BASIN #F-301 WILL BE INSTALLED WITH A DEEP SUMP (48") AND A HOOD. THE BASIN HASE.
BEEN INSTALLED, AND NO OTHER PRETREATMENT BMP'S ARE FEASIBLE.
CONNECTED TO A DOWNSTREAM SYSTEM WHERE OTHER TREATMENT PRACTICES HAVE ALREADY
A CONTRIBUTING DRAINAGE AREA OF 0.13 ACRES (<0.25), IS IN AN OFFLINE CONFIGURATION, IS
CATCH BASIN #F-102 WILL BE INSTALLED WITH A DEEP SUMP (48") AND A HOOD. THE BASIN HASD.
CALCULATED WQF RATE OF 1.0 CFS.
MAXIMUM WATER QUALITY FLOW (WQF) TREATMENT RATE OF 1.4 CFS, WHICH EXCEEDS THE
CONTECH STC 900 HYDRODYNAMIC SEPARATOR. THE EXISTING TREATMENT STRUCTURE HAS A
EXISTING 200 SERIES COLLECTION STRUCTURES WILL DISCHARGE THROUGH AN EXISTINGC.
INFILTRATE THE CALCULATED WATER QUALITY VOLUME (WQV) EQUIVALENT TO 1.3" OF RAINFALL.
TO A STORMTECH MC-3500 SUBSURFACE INFILTRATION SYSTEM SIZED TO FULLY RETAIN AND
CLEAN RUNOFF FROM THE ROOF AND ADJACENT LANDSCAPED RAIN GARDENS WILL DISCHARGEB.
ALL CATCH BASINS SHALL HAVE 24" (MIN.) SUMPS EXCEPT AS NOTED.A.
STORMWATER RUNOFF FROM ALL NEW IMPERVIOUS SURFACES WILL BE TREATED AS FOLLOWS:3.
DISCHARGING OFF-SITE AS COMPARED TO THE APPROVED PAD DEVELOPMENT.
THERE WILL BE NO NET INCREASE IN PEAK FLOW RATES FOR THE 1-YEAR THROUGH 100-YEAR STORM2.
SITE VIA CONNECTION TO THE EXISTING COLLECTION SYSTEMS ON SITE.
A SERIES OF ROOF LEADERS, YARD DRAINS, CATCH BASINS & DRAINAGE PIPING AND DISCHARGED OFF
STORMWATER RUNOFF FROM THE PROPOSED DEVELOPMENT OF LOT F WILL BE COLLECTED THROUGH2.
FURNISHING MATERIALS.
THE CONTRACTOR SHALL CONFIRM ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO ORDERING AND/OR
OF THE ORIGINAL DORSET CROSSING PAD MASTER DEVELOPMENT PLAN. SEE MAP REFERENCES 1 & 2.
THE DRAINAGE SYSTEM SERVING LOT F HAS BEEN PARTIALLY INSTALLED AS PART OF THE CONSTRUCTION1.Page 344
S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
WG
S
S
GG
S
?
2622
CL&P
2623
CL&P
234
CL&P
3572
CL&P
4362
SNET
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
E
E
C
C
T
FLAG POLE
D
CONC. WALK
SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE: 1" = 20'
PROJECT NUMBER:
00222 - 001
20 0 20 40 60
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION
SHEET
DATE
REVISED
5/18/26
6/26/26
OF 4 6
REVISION SUMMARY
DORSET CROSSING PAD
MASTER DEVELOPMENT PLAN
PREPARED FOR
DIAMOND SPARKLE CAR WASH LLC, APPLICANT
UTILITY PLAN
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)
+201.50
+
201.50
+201.25
+
201.25
+200.60
+201.10
+201.20
+
201.50
+
201.80
+200.50
+
201.05
+201.20
+200.10
+ 199.20
+200.70
+
200.75
+
201.20
+
201.25
+200.55
+200.10
+
201.05
+
200.50
+
200.50
+
199.20
+
200.80
+
200.80
+
200.80
+200.85
+
201.60
+
202.00
+
202.00
198
200
200
198
200
200
200
202
201
201
201
202
201
LP
L
P
L
P
LP
LP
L
P
L
P
LP
LP
LP
LP
LP
H
O
P
M
E
A
D
O
W
S
T
R
E
E
T
(C
T
R
O
U
T
E
10 &
202)
DORSET CROSSING DRIVE
Mixed Use Retail/Medical Office
Total 15,000 Square Feet
1 Story
BUILDING #2
CONNECTION (TYP.)
ACCESS/ROADWAY
POSSIBLE FUTURE
DRAINAGE EASEMENT
EASEMENT
EASEMENT
FAVOR OF CL&P
EASEMENT IN
OF AQUARION
EASEMENT IN FAVOR
TOWN OF SIMSBURY
EASEMENT IN FAVOR OF
FL = 193.65 (8")
TF = 202.94
EX. SMH
FL = 187.40 (8")
TF = 198.49
EX. SMH
FF = 201.50
CAR WASH
1 STORY
BUILDING #1
ROOM
UTILITY
METER
ELECTRIC
METER
GAS
EXISTING TRANSFORMER
E
X
IS
T
IN
G
D
R
IV
E
W
A
Y
UTILITY STATEMENT
4455, IN ACCORDANCE WITH CBYD NOTIFICATION PROCEDURES PRIOR TO COMMENCING WORK.
AUTHORITIES PRIOR TO CONSTRUCTION. CONTRACTOR TO NOTIFY "CALL BEFORE YOU DIG" AT 1-800-922-
EXISTENCE OF ALL SUCH FEATURES MUST BE FIELD DETERMINED AND VERIFIED BY THE APPROPRIATE
IN NATURE. ADDITIONALLY, OTHER SUCH FEATURES MAY EXIST ON THE SITE. THE SIZE, LOCATION AND
IN THE AREA, EITHER IN-SERVICE OR ABANDONED. THESE LOCATIONS MUST BE CONSIDERED APPROXIMATE
THIS PLAN SET MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES COMPRISE ALL SUCH UTILITIES
GOVERNMENT AGENCIES, PAROLE TESTIMONY, FIELD SURVEY AND OTHER SOURCES. THE SURVEYOR AND
COMPILED, IN PART, FROM RECORD MAPPING SUPPLIED BY THE RESPECTED UTILITY COMPANIES OR
UNDERGROUND UTILITY, STRUCTURE AND FACILITY LOCATIONS DEPICTED AND NOTED HEREON HAVE BEEN
UTILITY NOTES
WATER NOTES
SANITARY NOTES
ELECTRIC & TELECOMMUNICATIONS
GAS
FOR CLARITY PIPES MAY NOT BE DRAWN TO SCALE OR EXACTLY LOCATED.5.
THE INFORMATION ON THE DRAWINGS.
FIELD VERIFIED. NOTIFICATION SHALL BE GIVEN TO THE OWNER IF THE FIELD VERIFICATION DIFFERS FROM
IS IN THE VICINITY OF EXISTING PIPING, THE LOCATION AND ELEVATION OF THE EXISTING PIPING SHALL BE
WHEN CONNECTIONS ARE TO BE MADE TO EXISTING PIPING AND STRUCTURES OR WHERE CONSTRUCTION4.
BE CONTACTED BY THE CONTRACTOR.
BEFORE WORKING WITH OR AROUND EXISTING UTILITIES, THE APPROPRIATE UTILITY COMPANY SHALL3.
THE CONTRACTOR, AT HIS EXPENSE WITH THE PERMISSION OF THE OWNER.
CONSTRUCTION WITHOUT UNDUE INTERRUPTION OF SERVICE MAY BE REMOVED AND REPLACED BY
UNLESS OTHERWISE INDICATED ON THE DRAWINGS. ANY PIPING WHICH CAN BE REMOVED DURING
LOCATE AND MAINTAIN IN SERVICE ALL EXISTING UTILITIES ENCOUNTERED DURING CONSTRUCTION
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE AND ORDER ALL NEW SERVICES,2.
SPECIFICATIONS AND DETAILS OF THE APPROPRIATE PUBLIC UTILITY COMPANY.
ALL UNDERGROUND UTILITIES MUST BE INSTALLED IN ACCORDANCE WITH THE STANDARDS,1.
FINAL CONNECTION LOCATION SUBJECT TO REVIEW AND APPROVAL BY EVERSOURCE.
NEW BUILDING BY A CONNECTION TO THE EXISTING TRANSFORMER ON THE WESTERLY PROPERTY LINE.
NEW ELECTRIC & TELECOMMUNICATIONS SERVICES SHALL BE PROVIDED TO THE UTILITY ROOM IN THE1.
CONNECTICUT NATURAL GAS.
NORTHWEST CORNER OF THE SITE. CONNECTION LOCATION AND SIZE TO BE REVIEWED AND APPROVED
THE NEW BUILDING SHALL BE SERVED BY A NEW GAS CONNECTION TO AN EXISTING STUB AT THE2.
THE CONTRACTOR PRIOR TO INSTALLING GAS SERVICES.
THE LOCATION, SIZE, AND DEPTH OF ALL CONNECTION POINTS SHALL BE VERIFIED IN THE FIELD BY1.
STUBS PER MAP REF. 2 (VIF)
EXISTING 6" FIRE & 4" DOMESTIC
EXISTING GAS VALVE (VIF)
8" CLDIP WATER MAIN
12" CLDIP WATER MAIN
TOWN OF SIMSBURY.
COMPANY OF CONNECTICUT RULES AND REGULATIONS DATED JULY 31, 2024, AS AMENDED AND THE
ALL MATERIALS AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE AQUARION WATER5.
(SDR 26) PIPE WITH GASKETED, COMPRESSION-TYPE JOINTS WITHIN 10 FEET OF THE WATER LINE.
CONSTRUCTED OF WATER WORKS GRADE DUCTILE IRON PIPE WITH MECHANICAL JOINTS OR PVC
SANITARY SEWER LINES. IF 18 INCHES OF CLEARANCE IS NOT PROVIDED THEN THE SEWER MUST BE
A MINIMUM OF 18 INCHES OF VERTICAL CLEARANCE SHALL BE PROVIDED BETWEEN NEW WATER AND4.
ALL NEW WATER LINES SHALL HAVE A MINIMUM OF 54" OF COVER.3.
CONFORM TO CLASS 52 CONFORMING TO AWWA C151.
AT THE NORTHWEST CORNER OF THE SITE TO THE UTILITY ROOM IN THE NEW BUILDING. PIPE SHALL
A NEW 4"Ø CLDIP DOMESTIC WATER SERVICE SHALL BE INSTALLED FROM THE EXISTING SERVICES STUB3.
CONFORMING TO AWWA C151.
THE SITE TO THE SPRINKLER ROOM IN THE NEW BUILDING. PIPE SHALL CONFORM TO CLASS 52
SERVICE SHALL BE INSTALLED FROM THE EXISTING SERVICE STUB AT THE NORTHWEST CORNER OF
FIRE/SPRINKLER SERVICES FOR THE CAR WASH ARE NOT REQUIRED. IF REQUIRED THE NEW FIRE2.
THE CONTRACTOR PRIOR TO ORDERING, FURNISHING, OR INSTALLING WATER SERVICES.
THE LOCATION, SIZE, AND DEPTH OF ALL CONNECTION POINTS SHALL BE VERIFIED IN THE FIELD BY1.
FL (CALC) = 190.7± (VIF)
LATERAL PER MAP REF. 2.
EXISTING 6" PVC SANITARY SERVICE
SIZE TO BE CONFIRMED BY MEP
4" DOMESTIC WATER SERVICE
T
FL (CALC) = 191.2± (VIF)
STUB PER MAP REF. 2.
EXISTING 6" PVC SANITARY
6" FL = 196.5±
6" FL = 198.0±
6" FL = 198.0±
6" FL = 198.0±
6" FL = 198.0±
ELECTRIC & TELECOMM SERVICE
GAS SERVICE
@ 0.070 FT/FT
45 LF - 8"Ø PVC (SDR35)
@ 0.083 FT/FT
26 LF - 8"Ø PVC (SDR35)
FL(OUT) = 194.25
FL(IN) = 194.35
TF = 201.25
SMH #1
FL(OUT) = 197.00
FL(IN) = 197.10
TF = 201.45
SMH #2
FL(OUT) = 197.65
FL(IN) = 197.85
TF = 201.45
SMH #3
DESIGN BY OTHERS
WATER RECOVERY SYSTEM
ADAWF, MAX. DAILY, AND PEAK DEMAND TO BE CONFIRMED BY MEP.C.
CALCULATED ADAWF = 31,940 GPDB.
WASH FACILITY IN COLCHESTER, CT WITH GROWTH FACTOR = 1.36 AND FACTOR OF SAFETY = 1.50.
AVERAGE DAILY FLOW CALCULATED BASED ON METER FLOW READINGS FROM DIAMOND SPARKLE CARA.
SANITARY SEWER FLOW CALCULATIONS:5.
POLLUTION CONTROL AUTHORITY RULES AND REGULATIONS.
ALL MATERIALS AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE TOWN OF SIMSBURY WATER4.
THE DOWNSTREAM DIRECTION OF THE MAIN SHALL BE MADE.
SEWER MAIN IS REQUIRED, A SADDLE OR OTHER APPROVED CONNECTION METHOD AT AN ANGLE OF 45° IN
DIRECT CONNECTION TO THE EXISTING SEWER STUB SHALL BE MADE. IF DIRECT CONNECTION TO THE3.
PIPE SLOPE SHALL BE 2% AND THE MAXIMUM PIPE SLOPE SHALL BE 10%
CONFORM TO ASTM D2241 AND SHALL MEET THE DEFLECTION STANDARDS OF ASTM D3303. THE MINIMUM
AN EXISTING 6" STUB IN THE 8" PVC SEWER MAIN IN THE DRIVEWAY TO THE WEST. THE PIPE SHALL
THE NEW BUILDING WILL BE SERVED BY A 6"Ø PVC (SDR 35) SANITARY SEWER LATERAL CONNECTING TO2.
THE CONTRACTOR PRIOR TO ORDERING, FURNISHING, OR INSTALLING SEWER SERVICES.
THE LOCATION, SIZE, TYPE, AND DEPTH OF ALL CONNECTION POINTS SHALL BE VERIFIED IN THE FIELD BY1.
FL = 185.09 (8")
TF = 197.39
EX. SMH
FL = 184.11 (8")
TF = 196.63
EX. SMH
TF = 193.81
EX. SMH
REMOVED OR ABANDONED
WATER PIPE STUBS TO BE
EXISTING FIRE AND DOMESTIC
250' - 8" P
V
C
@
0.025Page 345
NOTES:
1. INSTALL PER MANUFACTURER
SPECIFICATIONS.
2. INSPECT PER EROSION CONTROL
NOTES OR AS DIRECTED.
3. REMOVE SEDIMENT WHEN BAG
IS HALF FULL AND DEPOSIT PER
EROSION CONTROL NOTES.
4. REPAIR OR REPLACE WITHIN 24
HOURS OF OBSERVED FAILURE.
S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
E
E
C
T
FLAG POLE
CONC. WALK
ANTI-TRACKING PAD DETAIL
SOIL STOCKPILE DETAIL
SECTIONELEVATION
SILT FENCE
INLET SEDIMENT
CONTROL DEVICE
TEMPORARY SEDIMENT TRAP (TST) SIZING
PLAN
TEMPORARY SEDIMENT TRAP
OUTLET SECTION
SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE: 1" = 20'
PROJECT NUMBER:
00222 - 001
20 0 20 40 60
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION
SHEET
DATE
REVISED
5/18/26
6/26/26
OF 5 6
REVISION SUMMARY
DORSET CROSSING PAD
MASTER DEVELOPMENT PLAN
PREPARED FOR
DIAMOND SPARKLE CAR WASH LLC, APPLICANT
EROSION & SEDIMENTATION CONTROL PLAN
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)
38C
NRCS
38C
NRCS
38C
NRCS 34A
NRCS
34A
NRCS
34B
NRCS
198
200
200
198
200
200
200
202
201
201
201
202
201
DORSET CROSSING DRIVE
SEE PLAN FOR WIDTH
NOT TO SCALE
COMPACTED SUBGRADE
50'-0" MIN. LENGTH
ROAD
6" CTDOT 2" STONE
FOR LOW SOIL BEARING CAPACITY
USE MIRAFLEX 600X OR EQUAL
2 MAX
3
NOT TO SCALE
MATERIAL STOCKPILE
FLOW
(TYP.)
STOCKPILE (TYP.)
OF MATERIAL
AROUND PERIMETER
SYSTEM PLACED
EROSION CONTROL
NOT TO SCALE
FLOW
3'-0" M IN.
NOTES:
1. INSTALL SILT FENCE & WOOD STAKES AS RECOMMENDED BY MANUFACTURER.
2. SILT FENCE SUBJECT TO HEAVY LOADS SHALL BE REINFORCED WITH FARM FENCING & STEEL
POSTS (0.5 # STEEL/L.F.). THE MINIMUM POST LENGTH SHALL BE 5'-0".
3. SILT FENCE FABRIC SHALL BE A PERVIOUS SHEET OF WOVEN PROPYLENE, NYLON, POLYESTER
OR POLYETHYLENE FILAMENTS AND SHALL BE CERTIFIED BY THE MANUFACTURER OR SUPPLIER.
2'-6" M
IN
.
12" M
IN
.
100°
10'-0" MAX.
6" M IN.
GRADE
FINISH
GRADE
FINISH
FENCE (SEE NOTE 2)
ATTACHED TO WIRE
SILT FENCE FABRIC
SELF-SUPPORTING
BACKFILL
RECOMPACTED
GROUND
FABRIC BELOW
EXTEND 6" OF
(MIN. LENGTH: 3' - 6')
1" x 2" WOOD STAKE
NOT TO SCALE
DUMPING STRAPS
STORM GRATE CURB OPENING
SILT SACK
LIFT STRAPS
CURB FILTER
PORTS
OUTFLOW
OPTIONAL
CT DOT #3 STONE
GEOTEXTILE FABRIC
MODIFIED RIPRAP
HAYBALES
DIVERTED RUNOFF
OUTLET
NOT TO SCALE
W
L
VARIES2'
1' M IN.
5' M AX.
1.5
1
1
2
1
2
2
1
WEIR
SOIL BERM
TST AREA (AC) REQUIRED WET VOL. DRY VOL.
(ACRE) VOL. (CY) (CY) (CY)
1 1 134 67 67
18" DRY VOLUM E
18" W ET VOLUM E
Mixed Use Retail/Medical Office
Total 15,000 Square Feet
1 Story
BUILDING #2
FF = 201.50
CAR WASH
1 STORY
BUILDING #1
8" CLDIP WATER MAIN
T
250' - 8" P
V
C
@
0.025
GENERAL CONSTRUCTION NOTES
SEQUENCE OF CONSTRUCTION
E & S CONTROL NARRATIVE
EROSION & SEDIMENT CONTROL PLAN
E & S CONTROL NOTES
INSPECTION AND MAINTENANCE
SIMSBURY AND THE STATE OF CONNECTICUT.
THE CONTRACTOR SHALL CONFORM TO ALL REQUIREMENTS OF ALL LOCAL AGENCIES OF THE TOWN OF2.
TO BE PERFORMED.
THE CONTRACTOR IS REQUIRED TO OBTAIN ALL NECESSARY LOCAL AND STATE PERMITS FOR THE WORK1.
REMOVE E&S CONTROLS WHEN PERMANENT VEGETATIVE COVER IS ESTABLISHED.11.
FINISH GRADE, SPREAD TOPSOIL, SEED, AND COMPLETE PLANTING.10.
INSTALL BITUMINOUS CONCRETE & CURBING.9.
CONSTRUCT ACCESS DRIVES, PARKING AREAS & WALKS.8.
INSTALL UTILITIES AND STORM DRAINAGE.7.
INSTALL FOUNDATION & ERECT BUILDING.6.
EXCAVATE, PLACE FILL AND ROUGH GRADE SITE.5.
STRIP & STOCKPILE TOPSOIL. EXPORT EXCESS TOPSOIL AS REQUIRED.4.
ABANDON AND/OR REMOVE UTILITIES AS REQUIRED.3.
FOR FIELD CONDITIONS.
INSTALL EROSION CONTROL MEASURES AT THE LOCATIONS SHOWN ON THE PLANS OR AS REQUIRED2.
COORDINATE A MEETING WITH TOWN AND OWNER. RESPONSIBLE PARTIES TO BE IDENTIFIED.1.
CONSTRUCTION UNTIL DISTURBED AREAS ARE STABILIZED.
FEATURES, MINIMIZE SOIL DISTURBANCE, AND MAINTAIN E&S CONTROLS FOR THE DURATION OF
WITHIN THE DEVELOPMENT AREA. THE CONTRACTOR SHALL TAKE CARE TO PRESERVE SURROUNDING
THE TOPOGRAPHY CONSISTS OF GENTLY SLOPING TERRAIN, WITH SLOPES RANGING FROM 2% TO 5%2.
MEASURES SHALL BE EMPLOYED AS REQUIRED, SUCH AS COVERING STOCKPILES OR APPLYING WATER.
TO WIND-BLOWN EROSION. LONG-TERM EXPOSURE OF THESE SOILS SHALL BE AVOIDED. DUST-CONTROL
MODERATE SUSCEPTIBILITY TO SHEET AND RILL EROSION AND A MODERATE TO HIGH SUSCEPTIBILITY
MERRIMAC FINE SANDY LOAM TO THE EAST. USDA IDENTIFIES THE SOILS AS HAVING A LOW TO
PER USDA NRCS SOIL MAPPING, THE SITE CONSISTS OF HINCKLEY LOAMY SAND TO THE WEST AND1.
CONCERNS & ISSUES SHALL BE NOTED:
DEPICTED ON THIS SHEET SHALL BE FOLLOWED. IN ADDITION THE FOLLOWING SITE SPECIFIC E&S CONTROL
THE EROSION & SEDIMENTATION CONTROL NOTES, INSPECTION REQUIREMENTS, PLANS, AND DETAILS
ARE COMPLETED.
STABILIZATION OF THE SITE WILL OCCUR IN SEQUENCE AS THE BUILDING AND SURROUNDING IMPROVEMENTS
SEDIMENTATION. PHASING OF MASS EARTH WORK IS NOT REASONABLE DUE TO THE LIMITED SIZE OF THE SITE.
MINIMIZES THE AREA, LIMIT AND TIME SOILS ARE EXPOSED TO RAIN AND WIND AND SUBJECT TO EROSION &
PART OF THE WORK, INCLUDING CONNECTION TO THE EXISTING PAVED DRIVEWAY TO THE WEST. THE PLAN
THE EXISTING PARCEL IS APPROXIMATELY 1.08 ACRE. APPROXIMATELY 1.1 ACRES WILL BE DISTURBED AS
IMPROVEMENTS. THE GENERAL SCOPE OF WORK IS DESCRIBED ABOVE IN THE CONSTRUCTION SEQUENCE.
THE PROPOSED PROJECT CONSISTS OF THE CONSTRUCTION OF A CAR WASH FACILITY AND ASSOCIATED SITE
AND SWALES SHALL BE MAINTAINED TO CONTROL RUNOFF AND PREVENT SEDIMENT DISCHARGE.
PUBLIC ROW AND INFILTRATION SHALL BE MAINTAINED. AT ALL TIMES DURING CONSTRUCTION, THE TST'S
DIRECTED TO THE TST'S. CONSTRUCTION WASTEWATERS SHALL NOT DISCHARGE DIRECTLY TO THE
DURING SITE CONSTRUCTION. ALL DEWATERING DISCHARGE AND CONSTRUCTION RUNOFF SHALL BE
TEMPORARY SILTATION TRAPS (TST) AND DIVERSION SWALES SHALL BE INSTALLED AS NECESSARY7.
DUST CONTROL MEASURES SHALL BE APPLIED THROUGHOUT THE CONSTRUCTION PERIOD. 6.
AN EROSION CONTROL SYSTEM SHALL BE INSTALLED AROUND ALL STOCKPILES OF SOIL.5.
BASINS ON SITE SHALL BE SURROUNDED WITH STRAW WADDLES OR BALES.
SACKS AS SHOWN ON THE PLAN THROUGHOUT THE CONSTRUCTION PERIOD. IF REQUIRED, NEW CATCH
ALL CATCH BASINS WITHIN THE PROJECT AREA SHALL BE PROTECTED WITH INLET CONTROL FILTER SILT4.
TRAFFIC. THE SURROUNDING ROAD SURFACES SHALL BE SWEPT DAILY OR AS REQUIRED.
TO PREVENT THE TRANSPORT OF SEDIMENTS OFF THE CONSTRUCTION SITE BY TRUCKS AND EQUIPMENT
AN ANTI-TRACKING APRON WILL BE INSTALLED AT ALL ENTRANCES TO THE CONSTRUCTION SITE IN ORDER3.
CONSTRUCTION WHEREVER POSSIBLE.
ALL EROSION AND CONTROL MEASURES SHALL BE INSTALLED AT THE PROJECT SITE PRIOR TO2.
EMERGENCY CONTACT: TO BE PROVIDED PRIOR TO ISSUANCE OF BUILDING PERMIT
PARTY RESPONSIBLE FOR E&S CONTROL PLAN: DIAMOND SPARKLE CAR WASH, LLC1.
100 LBS. PER ACRE.
TEMPORARY GRASS SEEDING, IF NECESSARY, SHALL BE PERENNIAL RYE GRASS APPLIED AT A RATE OF11.
ACRE OR AS RECOMMENDED BY THE SEED MANUFACTURER.
GRASS SEED MIXTURES SHALL BE TALL FESCUE BLEND APPLIED AT A RATE NO LESS THAN 100LBS PER10.
SPRING: APRIL 15 TO JUNE 15, FALL: AUGUST 15 TO SEPTEMBER 15
THE FOLLOWING DATES FOR SEEDING SHALL BE USED:9.
AREAS OUTSIDE OF IMPERVIOUS AREAS TO RECEIVE A MINIMUM 4" OF TOPSOIL.8.
IN CTDOT FORM 819 OR AS DIRECTED BY THE LANDSCAPE ARCHITECT.
ALL DISTURBED AREAS ARE TO BE RAKED, SEEDED AND FERTILIZED PER "TURF ESTABLISHMENT" SPEC.7.
THESE PLANS OR AS DIRECTED BY THE ENGINEER OR TOWN.
THE CONTRACTOR WILL BE RESPONSIBLE FOR IMPLEMENTING ALL E&S CONTROL DEVICES AS SHOWN ON6.
IS CONSISTENT WITH THE INTENT OF THE PLAN.
SEDIMENT REMOVED FROM ANY CONTROL STRUCTURES SHALL BE DISPOSED OF IN A MANNER WHICH5.
DURING THE CONSTRUCTION PERIOD AS NECESSARY OR REQUIRED BY THE ENGINEER OR THE TOWN.
EROSION CONTROL DEVICES SHALL BE MAINTAINED, REPLACED AND/OR ADDED BY THE CONTRACTOR4.
DATED 2023, AS AMENDED AND THE TOWN OF SIMSBURY REGULATIONS.
SPECIFICATIONS OF THE "CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL",
ALL E&S CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE STANDARDS AND3.
E&S CONTROL MEASURES SHALL BE INSTALLED PER THE PLANS, OR AS DIRECTED BY THE TOWN.2.
CONSTRUCTION IS ANTICIPATED TO START IN FALL 2026 AND BE COMPLETED IN 2027.1.
ALL STORMWATER STRUCTURES SHALL BE CLEANED AFTER REMOVAL OF E&S CONTROLS.6.
THE HEIGHT (MAX.)2 1STRAW BALES - REMOVE COLLECTED SEDIMENT @ iv.
SILT SACKS - CLEAN PER MANUFACTURER'S RECOMMENDATIONSiii.
THE HEIGHT (MAX.)2 1SILT FENCE - REMOVE COLLECTED SEDIMENT @ ii.
ANTI-TRACKING APRON - REPLENISH OR REPLACE STONE SA REQUIREDi.
TEMPORARY CONTROLS SHALL BE INSPECTED WEEKLY AND CLEANED:B.
INSPECT ROAD DAILY AND SWEEP/REMOVE TRACKED MATERIALS AS REQUIREDA.
ROUTINE INSPECTION AND MAINTENANCE SCHEDULE:5.
CAPACITY2 1DEWATERING BASINS - REMOVE COLLECTED SEDIMENT @ C.
DEPTH4 1SWALES - REMOVE COLLECTED SEDIMENT @ B.
DEPTH OF SUMP2 1CATCH BASINS - REMOVE COLLECTED SEDIMENT @ A.
GREATER THAN 0.1 INCHES AND CLEANED AS FOLLOWS:
ALL STORMWATER STRUCTURES SHALL BE INSPECTED WITHIN 24 HOURS AFTER RAINFALL EVENTS4.
AFTER RAINFALL EVENTS GREATER THAN 0.1 INCHES
ALL E&S CONTROLS SHALL BE INSPECTED, REPAIRED, AND CLEANED IF NECESSARY WITHIN 24 HOURS3.
CLEANED TO ENSURE THEY ARE IN PROPER WORKING ORDER.
CONDITIONS OR EFFECTS, ALL E&S CONTROLS SHALL BE INSPECTED, MAINTAINED, REPAIRED AND/OR
PRIOR TO A MAJOR STORM IN WHICH THE NOAA ISSUES WARNINGS OF FLOODING, SEVERE WEATHER2.
THE RESPONSIBLE PARTY SHALL PERFORM ROUTINE INSPECTIONS BASED ON THE FOLLOWING.1.
THE SITE IS STABILIZED.
RESPONSIBLE PARTY SHALL IMPLEMENT THE FOLLOWING THROUGHOUT THE CONSTRUCTION PERIOD UNTIL
REGULAR INSPECTION AND MAINTENANCE IS CRITICAL FOR THE EFFECTIVENESS OF E&S CONTROLS. THE
SWEPT AS REQUIRED
ROADWAY TO BE
APRON
ANTI-TRACKING
WET VOLUME = 67 CY
DRY VOLUME = 67 CY
TST #1
STOCKPILE
TOPSOIL
AROUND ALL BASINS (TYP.)
DEVICE TO BE INSTALLED
INLET SEDIMENT CONTROL
BOUNDARIES OR AS SHOWN (TYP.)
NORTH, EAST & SOUTH PROPERTY
SILT FENCE TO BE INSTALLED ALONG
DIVERSION SWALE TO WEST
WALL OF EX. CATCH BASIN
DISCHARGE INTO ORIFICE IN NORTH
STONE & RIPRAP WEIR FROM TST TOPage 346
S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
WG
S
S
GG
S
?
2622
CL&P
2623
CL&P
2623S
CL&P
ELEV.=198.71
E 989669.19
N 891545.09
P.K. NAIL
CP#19068
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
E
E
C
C
T
FLAG POLE
ELEV.=204.26
E 989309.93
N 891321.88
REBAR
CP#173
D
CONC. WALK
SET
MON.'S
SET
MON.
SET
MON.
SET
MON.
SET
MON.
SET
MON.
connection (typ.)
access/roadway
Possible future
connection (typ.)
access/roadway
Possible future
Mixed Use Retail/Medical Office
Total 15,000 Square Feet 1 Story
BUILDING #2
13A
Signal
Traffic
NOTES:
LIGHT POLE & BASE
SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE: 1" = 20'
PROJECT NUMBER:
00222 - 001
20 0 20 40 60
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION
SHEET
DATE
REVISED
5/15/26
6/26/26
OF 6 6
REVISION SUMMARY
DORSET CROSSING PAD
MASTER DEVELOPMENT PLAN
PREPARED FOR
DIAMOND SPARKLE CAR WASH LLC, APPLICANT
LIGHTING PLAN
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)
LP
L
P
L
P
LP
LP
L
P
L
P
LP
LP
LP
LP
LP
DORSET CROSSING DRIVE
H
O
P
M
E
A
D
O
W
S
T
R
E
E
T
(C
T
R
O
U
T
E
10 &
202)
NOT TO SCALE
1. CLASS "F" CONCRETE CTDOT 816
2. REINFORCEMENT NOT SHOWN FOR
CLARITY. GRADE 60.
3. ANCHOR BOLTS HOT DIPPED GALVANIZED.
DIAMETER, PROJECTION EMBEDMENT,
LOCATION PER LIGHT POLE MANUAL.
4. EXTERIOR LAMP, BASE & POST SHALL BE
COORDINATED WITH TOWN, OWNER, &
ELECTRICAL CONTRACTOR
CONDUIT
2" DIA. PVC
GRADE
FINISH
1" CHAMFER
(TYP. OF 2)
2" DIA. PVC SWEEP
GROUND ROD
1" DIA. PVC FOR
(SEE NOTE 3)
ANCHOR BOLT
MANUFACTURER
PER LIGHT POLE
BOLT PATTERN AS
24" DIA.
24" Ø
6"42"
DISTRIBUTION AS SPECIFIED
LIGHT FIXTURE OR EQUAL
LUMARK 'PRV-C15-D-UNV'
COOPER LIGHTING SOLUTIONS
15' M
O
U
N
T
IN
G
H
E
IG
H
T
A
B
O
V
E
B
A
S
E
LIGHTING STATEMENT
LIGHTING NOTES
LUMINAIRE SCHEDULE
ARRANGEMENTDESCRIPTIONLABELQUANTITYSYMBOL
DOUBLEPRV-C15-730-D-UNV-T4-SA-BKT4A0
SINGLEPRV-C15-730-D-UNV-T4-SA-BK-HSST4HSS12
SINGLEPRV-C15-730-D-UNV-T4-SA-BKT40
T4HSS
T4HSS
T4HSS
T4HSS
T4HSS
T4HSS
T4HSS
0.1 fc
0.1 fc
0.1 fc
0.1 fc
0.1 fc
0.1 fc
0.2 fc
0.2 fc
0.2 fc
0.2 fc
0.2 fc
0.5 fc
0.5 fc
0.5 fc
0.5 fc
0.5 fc
1.0 fc
1.0 fc
1.0 fc
1.0 fc
1.0 fc
2.0 fc
2.0 fc
2.0 fc
2.0 fc
E
X
IS
T
IN
G
D
R
IV
E
W
A
Y
AREA = 7,275 SF±
CAR WASH
1 STORY
BUILDING #1
CANOPY
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
ISOLINE CONTOUR (TYP.)
ISOLINE VALUE (TYP.)
T4HSS
T4HSS
T4HSS
T4HSS
T4HSS
0.2 fc
T4HSS
INTERNAL SITE LIGHTING AT COMMON LOT LINES IS IN HARMONY WITH THE APPROVED PAD DEVELOPMENT.
A MAXIMUM ILLUMINATION VALUE OF 0.5 FC HAS BEEN MET AT THE DORSET CROSSING ROW (SOUTH).2.
PROPERTY LINES HAVE NOT BEEN CONSIDERED IN THE ANALYSIS.
BUILDING MOUNTED LIGHTING OR EXISTING POLE MOUNTED FIXTURES ALONG THE NORTH, WEST, AND SOUTH
OF 0.5 TO 2.0 FC FOR DRIVES, PARKING AREAS AND PEDESTRIAN WALKS SERVING THE BUILDING ENTRANCES.
SOCIETY. MINIMUM HORIZONTAL ILLUMINATION LEVELS OF 0.2 FC ARE PROPOSED WITH A TYPICAL RANGE
DEVELOPMENT AND GENERALLY MEETS THE RECOMMENDATIONS OF THE ILLUMINATING ENGINEERING
EXTERIOR LIGHTING HAS BEEN DESIGNED FOR A SUBURBAN COMMERCIAL USE WITHIN AN APPROVED PAD1.
PHOTOMETRIC PLAN.
CANOPY LIGHTS WILL BE DARKSKY APPROVED OR MOUNTED IN THE CEILING. NOT INCLUDED IN
SEE ARCHITECTURAL PLANS FOR BUILDING AND CANOPY MOUNTED LIGHTING. ALL BUILDING AND4.
LEVELS SET TO 25% OF DESIGN VALUES.
LIGHTING WITHIN 15 MINUTES OF NO ACTIVITY SHALL HAVE REDUCED POWER OUTPUT AND ILLUMINATION
SECURITY AND SAFE VEHICULAR CIRCULATION THROUGH THE SITE FOR USE OF THE SELF-SERVE BAYS.
TIMERS, PHOTOCELLS, OR MOTION SENSORS TO REDUCE LIGHTING TO THE MINIMUM NECESSARY FOR
ARE CLOSED, ALL NON-ESSENTIAL LIGHTING FIXTURES SHALL BE CONTROLLED MANUALLY OR WITH
THE SELF-SERVE BAYS ARE OPEN 24 HOURS. WHEN THE AUTOMATIC TUNNEL AND TOUCHLESS BAYS3.
POLE-MOUNTED = 15' FIXTURE HEIGHTA.
FIXTURE MOUNTING HEIGHTS:2.
THAN 10° OF TILT.
PREVAIL LED IS DARKSKY APPROVED FOR 3000K CCT AND WARMER, WITH MOUNTING OPTIONS LESS
OF LIGHT AND GLARE ON ADJACENT PROPERTIES AND ROADWAYS. THE SELECTED FIXTURE LUMARK
ALL SITE LIGHTING SHALL BE FULL CUT-OFF OF SHIELDED TYPE TO PREVENT UPWARD DISTRIBUTION1.Page 347
Page 348
1 Diamond Sparkle Car Wash at Dorset Crossing Master Plan Change, Text Amendment, and Site Plan This is the final step of the three-part process for approving a new use in the Dorset Crossing Planned Area Development (PAD) zone. The proposal is to amend the Master Development Plan at Dorset Crossing and approve a site plan to enable development of a car wash at 10 Dorset Crossing, (Assessor’s Map Block Lot I04 403 13C-F), Planned Area Development (PAD) zone. The parcel is known as Lot F. In 2013, Dorset Crossing was approved as a Planned Area Development (PAD) with a mix of commercial and residential uses. The project mix was amended in 2022 and 2023 and currently allows 27,000 sq. ft. of commercial and 360 multi-family residential homes. The application proposes to amend the PAD zoning for “Lot F” to replace the current two- building, 12,000 sq. ft. of “retail/office” concept (approved but never developed) with a substantially smaller 7,275 sq. ft. car wash facility. A car wash is a permitted use as required by Section 8.1C of the PAD regulations: A. Permitted Uses Any use(s) permitted as of right or by Special Permit or Special Exception in the Simsbury Zoning Regulations are eligible for inclusion in a PAD and may be permitted in a Planned Area Development Zone. Such uses may be combined in a Mixed Use Development in accordance with the Development Plan Standards set forth in this Section.
Page 349
2 The car wash use is a marked improvement over the current approved use in nearly every respect: 1. The access plan will eliminate the curb cut on Dorset Crossing Drive, eliminating the conflict in turning movements with the existing driveway. 2. The impervious surface is reduced by nearly 12%. 3. The number of parking spaces required is greatly reduced. 4. The landscaping will have 100% native vegetation. 5. The side yard in the current use is 9 feet; the proposed use has over 50 feet. 6. The front yard for the building in the current approved use is a scant 9 feet; the car wash is 60 feet, nearly 7 times greater. 7. The building area is reduced by over 40%. 8. Even with the proposed hotel, on the adjacent parcel, the combined development traffic is still below the original approved peak hour volumes of the originally approved development The proposed car wash is consistent with the Plan of Conservation and Development and meets the demand in market area of a car wash utilizing the latest technology and providing unequaled customer service. It is an important and needed use for the many, and an increasing number of, residents in Simsbury living in multifamily developments. And, finally, and perhaps of overarching merit for this proposal, is the design, not only in the site engineering aspects noted above in terms of reducing the impact over the existing, approved use of Lot F, but the exceptionally attractive architectural design by a preeminent area firm, decidedly not the typical “out-of-the-box” design that comes with the car wash franchise operations with hundreds of the same car washes, all the same. This unique, site-specific, sensitive to its neighbors, and technology supporting design is nonpareil. June 30, 2026
Page 350
Page 351
3 - 2 6 - 2 6 3 - 2 6 - 2 6
Page 352
Hartford Sign&Design Hartford Sign&Design 70 Hopmeadow, Weatogue CT Extra Space 70 Hopmeadow St, Weatogue CT Craig Foreman 922 Davis St, Ste 3N Evanston, IL 60201 craig@newcoastre.com 773-308-5500
Page 353
To: DRB MARCH 27 2026 Re:EXTRA SPACE STORAGE A brownstone panel base monument sign is proposed for the location approved by the town on Hopmeadow Rd near Old Meadow Plain Rd. Also a non-illuminated, 45” x 99.5” ACM sign replaces a similarly sized sign from the previous occupant. It will be attached to the building with 3/8” x 3” tech screws. A vinyl label “OFFICE” will be applied to the glass window next to the entry door. Thank you, Gerian Williams Permitting Tech `328 Governor Street, East Hartford, CT 06108 • 860.293.1824
Page 354
SIGNAGE | BRANDED ENVIRONMENTS | MAINTENANCE Project No. 65798 Extra Space Storage 70 Hopmeadow St Weatogue, CT 06089 Location: 5041
Page 355
W.O. N o . Address City, ST O r i g . D r a f t Project Mg r. Designer Rev. Art R e v . D a t e P a g e R e v . THIS SIGN DESIGN IS EXCLUSIVE PROPERTY OF IDENTITI RESOURCES, LTD., AND IS THE RESULT OF THE ORIGINAL AND CREATIVE WORK OF IT’S EMPLOYEES. THIS DRAWING IS SUBMITTED TO THE CUSTOMER FOR THE SOLE PURPOSE OF PURCHASE OF THE DESIGN OR SIGNAGE MANUFACTURED TO THIS DESIGN, BY IDENTITI RESOURCES, LTD. DISTRIBUTION TO OR USE OF THIS SIGN DESIGN BY ANYONE OUTSIDE OF THE CUSTOMER’S ORGANI ZATION, WITHOUT EXPRESSED, WRITTEN AUTHORIZATION BY IDENTITI RESOURCES, LTD. IS PROHIBITED. Sign Type: 2000 Center Drive Suite C411 Hoffman Estates, IL 60192 Office 847.301.0510 identiti.net Plan View: Exterior Site Plan North YP 03.24.2026 005 65798 70 Hopmeadow St Weatogue, CT 06089 11.27.2025 Schyler Chilton NJL Customer LEGEND P1 Post & Panel S1 Front Elevation S2 Front Elevation SIGNAGE CRITERIA Code: Wall signs shall not exceed two-third (2/3) of the length of the building frontage, but in no case, shall exceed 32sq ft Landlord restrictions: N/A NTE 32 SF (Allowed) N/A S1 NTE 32 SF (Allowed) S2 P1 P1 S2 S1
Page 356
W.O. No. Address City, ST Orig. Draft Project Mgr. Designer Rev. Art Rev. Date Page Rev. Color Palette THIS SIGN DESIGN IS EXCLUSIVE PROPERTY OF IDENTITI RESOURCES, LTD., AND IS THE RESULT OF THE ORIGINAL AND CREATIVE WORK OF IT’S EMPLOYEES. THIS DRAWING IS SUBMITTED TO THE CUSTOMER FOR THE SOLE PURPOSE OF PURCHASE OF THE DESIGN OR SIGNAGE MANUFACTURED TO THIS DESIGN, BY IDENTITI RESOURCES, LTD. DISTRIBUTION TO OR USE OF THIS SIGN DESIGN BY ANYONE OUTSIDE OF THE CUSTOMER’S ORGANIZATION, WITHOUT EXPRESSED, WRITTEN AUTHORIZATION BY IDENTITI RESOURCES, LTD. IS PROHIBITED. Sign Type:2000 Center Drive Suite C411 Hoffman Estates, IL 60192 Office 847.301.0510 identiti.net EG 12.18.2025 001 65798 70 Hopmeadow St Weatogue, CT 06089 11.27.2025 Schyler Chilton NJL Signage: ACM Panel w/ Applied Vinyl; Flush mounted to wall N/A N/A SCALE: 1/2” = 12” Front Elevation S1-1 3M 3660M Matte Overlaminate Trans. UV Protectant Film 3M 3630-106 Brilliant Green Face: White ACM Panel 3M 3630-22 Black EXISTING PROPOSED ALLOWED SF: 32 PROPOSED SF: 31.09 360.00" (30'-0") ±70.375" (5'-10 3/8") ±51.875" (4'-3 7/8") 99.50" (8'-3 1/2") 45.00" (3'-9") 26.750" (2'-2 3/4") EQ EQ EQ EQ
Page 357
W.O. No. Address City, ST Orig. Draft Project Mgr. Designer Rev. Art Rev. Date Page Rev. Color Palette THIS SIGN DESIGN IS EXCLUSIVE PROPERTY OF IDENTITI RESOURCES, LTD., AND IS THE RESULT OF THE ORIGINAL AND CREATIVE WORK OF IT’S EMPLOYEES. THIS DRAWING IS SUBMITTED TO THE CUSTOMER FOR THE SOLE PURPOSE OF PURCHASE OF THE DESIGN OR SIGNAGE MANUFACTURED TO THIS DESIGN, BY IDENTITI RESOURCES, LTD. DISTRIBUTION TO OR USE OF THIS SIGN DESIGN BY ANYONE OUTSIDE OF THE CUSTOMER’S ORGANIZATION, WITHOUT EXPRESSED, WRITTEN AUTHORIZATION BY IDENTITI RESOURCES, LTD. IS PROHIBITED. Sign Type:2000 Center Drive Suite C411 Hoffman Estates, IL 60192 Office 847.301.0510 identiti.net EG 12.18.2025 001 65798 70 Hopmeadow St Weatogue, CT 06089 11.27.2025 Schyler Chilton NJL Scale: 3” = 12” 7.00 in 28.75 in 2'-4 3/4" 3/8” ESS.FCO1.LIN.W.7 EXISTING PROPOSED ALLOWED SF: 32.00 PROPOSED SF: 1.40 360.00" (30'-0") ±70.375" (5'-10 3/8") ±51.875" (4'-3 7/8") Signage: 3/8” Acrylic FCOs VHB mounted to glass FCO Acrylic Letters S2N/A N/A N/AN/A N/ACopy: White Acrylic C/L
Page 358
W.O. N o . Address City, ST O r i g . D r a f t Project Mg r. Designer Rev. Art R e v . D a t e P a g e R e v . Color Palette THIS SIGN DESIGN IS EXCLUSIVE PROPERTY OF IDENTITI RESOURCES, LTD., AND IS THE RESULT OF THE ORIGINAL AND CREATIVE WORK OF IT’S EMPLOYEES. THIS DRAWING IS SUBMITTED TO THE CUSTOMER FOR THE SOLE PURPOSE OF PURCHASE OF THE DESIGN OR SIGNAGE MANUFACTURED TO THIS DESIGN, BY IDENTITI RESOURCES, LTD. DISTRIBUTION TO OR USE OF THIS SIGN DESIGN BY ANYONE OUTSIDE OF THE CUSTOMER’S ORGANI ZATION, WITHOUT EXPRESSED, WRITTEN AUTHORIZATION BY IDENTITI RESOURCES, LTD. IS PROHIBITED. Sign Type: 2000 Center Drive Suite C411 Hoffman Estates, IL 60192 Office 847.301.0510 identiti.net EXISTING PROPOSED ALLOWED SF: N/A PROPOSED SF: 32 70 4.00" 17.50" (1'-5 1 / 2 ") 17.50" (1'-5 1 / 2 ") 96.00" (8'-0") 48.00" (4'-0") 2" 3" 3" 3" 90.00" (7'-6") 18.00" (1'-6") 18.00" (1'-6") 132.00" (11'-0") Signage: Post & Panel P1-3 (Qty. 2) ACM P anel with A pplied V in y l ; Mounted Between Post Posts set in Concrete/Stone Base SCALE: 1/2” = 12” 65798 70 Hopmeadow St Weatogue, CT 06089 11.27.2025 Schyler Chilton NJL Primary Panel: White Substrate TBD Base: Brownstone Paneling Posts: White Keyline Border: Color TBD NEIGHBORING TENANT “ESS” ACM Panel: SW 6923 Festival Green “ESS” Vinyl: 3M 7725-10 White “ESS” Vinyl: 3M 7725-12 Black 70 96.00" (8'-0") YP 03.24.2026 005 REQUIRED FOR NEW BASE STRUCTURE FOUNDATION, ENGINEERING, PERMITTING finished with brownstone paneling to match local standard BASE CONSTRUCTION: Fabricated sheet metal shroud around leg base, Construction of new base/monument signage at approved site Scope Of work:
Page 359
Marc S. Nelson, MPA George K. McGregor, AICP Town Manager Director PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT 1 STAFF REPORT MEMORANDUM To: Simsbury Design Review Board From: Joseph Hollis, CZEO Date: April 6, 2026 Subject: Zoning Compliance Review of NRE Simsbury TIC 1, LLC a.k.a. Craig Forman, Owner; Darin Senna, Applicant, for sign permit to install one ± 31s.f. wall sign and one ± 1 s.f. window sign for the tenant fit out of Extra Space Storage at 70 Hopmeadow Street (Map Block Lot E18 117 001-2A), Simsbury, Zone I-1/PAD. Background The Zoning Compliance Review has been submitted by Craig Forman on behalf of NRE Simsbury T1C, LLC for new tenant signage for Extra Space Storage at the former Talcott Mountain Self Storage Site on Hopmeadow Street. The parcel is 10.6899 acres and is situated near the Avon/Simsbury town line off of Tower Drive. The freestanding sign that was included in the application materials will be part of a future application and is not part of this zoning compliance application.
Page 360
2 Staff Analysis The 31s.f. wall sign replaces an existing wall sign for the former tenant. The sign construction is comprised of a polycarbonate substrate with multi layered vinyl graphics sealed with a matte overlaminate protectant film. There are no changes to location or lighting proposed. The 1s.f. window sign is a white vinyl graphic that will be applied to the window near the business office. Staff finds the proposal is consistent with the Simsbury Zoning Regulations and the Guidelines for Community Design.
Page 361
3 Draft Motion MOVED, the Design Review Board submits a positive referral for the Zoning Compliance Review of NRE Simsbury TIC 1, LLC a.k.a. Craig Forman, Owner; Darin Senna, Applicant, for sign permit to install one ± 31s.f. wall sign and one ± 1 s.f. window sign for the tenant fit out of Extra Space Storage at 70 Hopmeadow Street (Map Block Lot E18 117 001-2A), Simsbury, Zone I-1/PAD. The referral is based on the following conditions: 1. The project shall be developed in substantial conformance with the sign plan titled, “Extra Space Storage” prepared by Identiti Resources, LTD, stamped received by the Simsbury Planning Department on March 27, 2026. 2. Staff can approve minor modifications to the approved plans prior to implementation in the field.
Page 362
Page 363
Page 364
Page 365
Elec. Light Light Light Light 18" Sycamore Bank Directory Sign 8' Shrub 8" Catalpa 14" Sycamore Shrub Bank Directory Sign Business Sign 18" Maple CB TF=174.20 Mailbox RL RL RL RL RL Stop Sign CB TF=171.44 CB TF=170.97 Elec Meter RLRL Spigot Business Sign Traffic Sign Elec. 20" Maple RL RL Shrub 6" Pear 8" Pine 8" Pine 12" Pine RL 6" Dogwood Stop/Do Not Enter Sign 18" Sycamore 18" Sycamore 24" Sycamore 16" Sycamore 22" Sycamore Stop/Do Not Enter Sign San MH TF=171.62 CB TF=170.55 CB TF=170.62 Shrub Shrub Shrub Light Light Light Irr. Box Bank Directory Sign HC Sign HC Sign H/C Bollard H/C Bollard Light Light Elec. Elec. Elec. Gas Meter H/C Button 8" W INV=162.17 8" N INV=161.46 8" S INV=161.36 12" S INV=167.40 12" N FL=167.33 12" S FL=167.05 CB TF=169.96 Eversource 164 Eversource 163 24" W FL=162.58 24" E FL=162.81 12" N FL=163.48 24" W FL=162.93 24" W FL=160.91 24" E FL=160.73 24" E FL=161.40 24" W FL=160.96 INV=160.15 CB TF=167.36 Storm MH TF=168.30 Storm MH TF=168.23 CB TF=167.80 AT&T MH San MH TF=169.65 6" N INV=161.13 8" NW INV=160.67 8" SE INV=160.57 Speed Sign Tel. Irr. Box Elec. 6" Pine 6" Pine 8" Pine 8" Pine Street Sign Traffic Light Support Elec. Elec. Traffic Sign Business Sign Light Light Light Light Light Flag Pole Bike Rack San MH TF=168.57 WG WGWG WG IR MonN44°57'07"E 27.88' N44°57'07"E 273.15' S42°32'20"E 217.27' S45°05'50"W 22.43' S37°46'18"W 248.01' S82°59'17"W35.22' N51°47'44"W 112.58' Δ=31°18'28" R =214.76 FT L=117.35 FT T=60.18 FT Sidewalk Step A/C Gravel A/C Gravel Gravel Sidewalk Sidewalk Sidewalk Step Step Gen Hedge Hedge Pad Trees Memorial Stone Drive-Thru Structure ATM Woods Bike Rack Building FF=173.45 Building FF=175.95 Grass Grass Grass Grass Sidewalk Sidewalk Sidewalk Porch Steps Planting Bed Planting Bed Planting Bed Planting Bed Paved Parking Paved Parking HOPMEADOW STREET - CT ROUTE 10 & US ROUTE 202 OWENS BROOK BOULEVARD N/F The Trustees of Westminster School Inc. Zone R-15 N/F Mark J. Neuhauser Zone R-15 N/F Valley Freemasons Building Association Zone SC N/F Town of Simsbury Zone R-15 N/F Town of Simsbury Zone SC 172 172 173 174 175 176 176 176 175 175 174 174 175 175 174 175 174 173 172 172 173 174 173 172 171 171 173 172 171 170 170 170 171 172 173 173 172 173 172 172 171 171 173 169 169 Wetland Soils as per Town of Simsbury GIS 100' Upland Review Area 35' SanitarySewer Easement ±36.0' ±39.7' ±35.6' ±45.7' ±78.3' ±20.4' 20' Building Setback 10' Parking Setback Notes: 1. Parcel is located in Zone SC-1. 2. The site is served by public water and sanitary sewer services. 3. Horizontal Datum - NAD83 ~ Vertical Datum - NAVD88 Map References: 1. "Resubdivision Plan for the Relocation of Masonic Lodge, 981-987 Hopmeadow Street, A.K.A. Route's 10 & 202, Simsbury , Conn., Zone: PO, Scale: 1"=30', July 11, 2008, Sht. 1/2", Sanderson & Washburn NOT VALID WITHOUT RAISED SEAL THIS SURVEY AND MAP HAS BEEN PREPARED IN ACCORDANCE WITH SECTIONS 20-300b-1 THRU 20 OF THE REGULATIONS OF CONNECTICUT STATE AGENCIES - "MINIMUM STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ENDORSED BY THE CONNECTICUT ASSOCIATION OF LAND SURVEYORS, INC. THIS IS A PROPERTY SURVEY BASED UPON A DEPENDENT RESURVEY. CLASS OF ACCURACY: CLASS A-2 / T-2 Graphic Scale: 0' 60'40'20'10'20' Map Showing Land of 981 Hopmeadow, LLC 981-987 Hopmeadow Street Simsbury Connecticut Scale: 1"=20' March 30, 2026 Prepared By Neriani Land Surveying, LLC 56 Hillcrest Drive - Barkhamsted, Connecticut 06063 (860) 677-7732 These drawings are the property of the Surveyor and have been prepared specifically for the Owner of the Project at this site. They are not to be used for any other purpose, location, or person without the written consent of the Surveyor. No declaration is expressed or implied unless these plans bear the live signature and embossed seal of the Surveyor whose name appears hereon.
Page 366
Page 367
Page 368
Page 369
Minutes: archived copy, SHA-256 85e05e1b8497…. Agenda: archived copy, SHA-256 b66e3c5ac7ea…. Packet: kept offline, SHA-256 1ac5c360c58a….