Towns / Simsbury / Planning Commission / Sep 8, 2026
Planning Commission, Sep 8, 2026
Simsbury Planning Commission Hide agendas that already have minutesDocuments
| Type | Document | Pages | Open |
|---|---|---|---|
| minutesminutes | Planning Commission Meeting Minutes | 2 | PDF download · town site |
| agenda | Planning Commission Meeting | 1 | PDF download · town site |
| packetpacket | Planning Commission Meeting (packet) | 7 | PDF download · town site |
Summary
Only a meeting packet is posted. Packets (the supporting documents) are archived and searchable but not summarized; open the PDF to read it.
Full text of the documents
View the minutes PDF on this page (Planning Commission Meeting Minutes)
Text of the minutes (Planning Commission Meeting Minutes, 2 pages)
Page 1 · open in PDF
Page 1 of 2 Planning Commission 1 Regular Meeting 2 September 8, 2026 – 7:00 P.M. 3 Simsbury Town Hall – Main Meeting Room 4 933 Hopmeadow Street, Simsbury, CT 06070 5 6 MINUTES7 8 I. CALL TO ORDER – Chair Leavitt-Smith called the meeting to order at 7:02 P.M.9 10 Present: Chair, Erin Leavitt-Smith; Vice Chair, William Rice; Commission Members: 11 Holly Beum, Nicholas Criscitelli, and Marcus Furze; Alternate Commission Members 12 Don Colantonio and Peter Harrison; Assistant Town Planner, Brittany MacGilpin and 13 Planning Director, George McGregor. 14 15 Absent: Commissioner Member Julie Eaton; Alternate Commission Member Paul S. 16 Sullivan.17 18 II. APPROVAL OF MINUTES 19 20 August 25, 2026, Regular Meeting 21 22 MOTION: Commissioner Beum made a motion, seconded by Vice Chair Rice, to 23 approve the Minutes of August 25, 2026, Regular Meeting as amended. The motion 24 carried unanimously (6-0-0).25 26 III. GENERAL COMMISSION BUSINESS 27 28 Referral from Zoning Commission 29 30 ZC #26-24, Town of Simsbury Zoning Commission, Applicant, Brittany MacGilpin, 31 Agent, for a text amendment to Simsbury Zoning Regulations pursuant to Section 6 32 (Floodplain Zone) and Section 17 (Definitions) related to the Federal Emergency 33 Management Agency (FEMA) Flood Map Update. 34 35 Assistant Town Planner MacGilpin provided a summary presentation on the proposed 36 changes to the Floodplain Zone regulations, pursuant to the FEMA directed Map 37 amendments anticipated in late 2026. 38
Page 2 · open in PDF
Page 2 of 2 MOTION: Commissioner Beum made a motion, seconded by Vice Chair Rice, for 39 the Planning Commission to forward a POSITIVE recommendation to the Zoning 40 Commission for ZC 26-24, a Text Amendment application to Simsbury Zoning 41 Regulations pursuant to Section 6 (Floodplain Zone) and Section 17 (Definitions) 42 related to the Federal Emergency Management Agency (FEMA) Flood Map Update 43 Study based upon a finding that the request is consistent with the environmental 44 policies found in the Plan of Conservation and Development (POCD), which seeks to 45 “Preserve and protect watercourses, wetlands, and floodplains and their functions.” 46 (POCD Chapter 4 pg. 38). The motion carried unanimously (6-0-0) 47 48 IV. OTHER BUSINESS 49 50 FY 27/28 Budget Discussion: Projects 51 52 Ms. MacGilpin and Mr. McGregor led a discussion of potential FY27/28 Budget 53 priorities based on the Tariffville Neighborhood Plan recommendations. 54 55 The Commission recommended the following items be consider by the Board of 56 Selectmen as part of the upcoming budget process: 57 58 Tariffville Traffic/Pedestrian Data Gathering 59 Village Wayfinding and Signage 60 Town Web Page Enhancement for Tariffville 61 62 63 V. ADJOURNMENT 64 65 MOTION: Chair Leavitt-Smith made a motion, without objection, to adjourn the 66 meeting (6-0-0). 67 68 Chair Leavitt-Smith adjourned the meeting at 8:04 P.M. 69 70 Respectfully submitted, 71 72 George K. McGregor, AICP 73 Planning & Community Development Director 74
View the agenda PDF on this page (Planning Commission Meeting)
Text of the agenda (Planning Commission Meeting, 1 page)
Page 1 · open in PDF
Planning Commission Agenda PC AGENDA 9-8-26.PDF ZC 26-24 FEMA Flood Zone Text Amendment ZC 26-24 FEMA FLOOD ZONE MAP UPDATES STAFF REPORT FOR PC.PDF ZC 26-24 FEMA FLOOD ZONE MAP DEEP LETTER TO TOWN 5-19-26.PDF 1. Documents: 2. Documents:
View the packet PDF on this page (Planning Commission Meeting (packet))
Text of the packet (Planning Commission Meeting (packet), 7 pages)
Page 1 · open in PDF
Planning Commission Agenda PC AGENDA 9-8-26.PDF ZC 26-24 FEMA Flood Zone Text Amendment ZC 26-24 FEMA FLOOD ZONE MAP UPDATES STAFF REPORT FOR PC.PDF ZC 26-24 FEMA FLOOD ZONE MAP DEEP LETTER TO TOWN 5-19-26.PDF 1. Documents: 2. Documents:
Page 2 · open in PDF
AGENDA PLANNING COMMISSION – REGULAR MEETING Tuesday, September 8, 2026, at 7:00 pm Simsbury Town Hall 933 Hopmeadow St., Simsbury, CT 06070 I. CALL TO ORDER Seating of Alternates II. APPROVAL OF MINUTES August 25, 2026 III. GENERAL COMMISSION BUSINESS Referral from Zoning Commission ZC #26-24, Town of Simsbury Zoning Commission, Applicant, Brittany MacGilpin, Agent, for a text amendment to Simsbury Zoning Regulations pursuant to Section 6 (Floodplain Zone) and Section 17 (Definitions) related to the Federal Emergency Management Agency (FEMA) Flood Map Update Study IV. OTHER BUSINESS FY 27/28 Budget Discussion: Projects V. ADJOURNMENT
Page 3 · open in PDF
Marc S. Nelson, MPA George K. McGregor, AICP Town Manager Director PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT MEMORANDUM TO: Simsbury Planning Commission FROM: Brittany MacGilpin, Assistant Town Planner DATE: September 8, 2026 SUBJECT: FEMA Flood Map Text Amendments REQUEST The Federal Emergency Management Agency (FEMA) commenced a Flood Risk Study in 2018 of the Farmington River Watershed, which includes the Town of Simsbury and 18 other Hartford County communities. The detailed study reviewed flood prone areas with improved hydrologic and hydraulic analyses; new topographic and aerial imagery, revised modeling, re-delineation, and other changes to the floodplain characteristics such as development. Simsbury has approximately 1019 parcels in the flood zone. From these studies FEMA presented the Town of Simsbury with new preliminary Flood Insurance Rate Maps (FIRM) based on the Farmington River watershed study and these maps are currently scheduled to become effective on November 13, 2026. To assist the community in this map revision process, the CTDEEP reviewed the Town’s existing floodplain management regulations for compliance with federal standards for development in designated FEMA floodplains to ensure the local regulations meet or exceed the minimum federal flood standards of 44 CFR 60.3. The review indicated that revisions to the Town’s existing floodplain regulations are needed to maintain this minimum compliance. Therefore, for the Town of Simsbury to remain eligible in the National Flood Insurance Program (NFIP), these zoning regulation revisions must be adopted prior to the effective date of the community’s new FIRM. The following section shows the Zoning Regulation section and text changes to be made for minimum compliance with FEMA regulations and recently adopted state floodplain management requirements.
Page 4 · open in PDF
SPECIFIC TEXT AMENDMENT DESCRIPTIONS Section 6.4 Identification of the Special Flood Hazard Area Updates to the FIRM dates are shown in the bold text below. The Special Flood Hazard Areas (SFHA) identified by the Federal Emergency Management Agency (FEMA) in its Flood Insurance Study (FIS) for Hartford County, Connecticut, dated November 13, 2026, and accompanying Flood Insurance Rate Maps (FIRM), dated November 13, 2026 (Panels 09003C0 167G, 169G, 188G, 189G, 190G, 191G, 192G, 193G, 194G, 307G, 326G, 327G, 328G, 329G, 331G, 332G, 333G), and other supporting data applicable to the Town of Simsbury, and any subsequent revisions thereto, are adopted by reference into this regulation. Since mapping is legally adopted by reference into this regulation it must take precedence when more restrictive until such time as a map amendment or map revision is obtained from FEMA. Section 17.4 Definitions – Flood Definitions The definitions below will be updated by adding or updating with the bold text provided or remove strikethrough text. The missing definition for “Variance” will also be added. Improvement, Substantial: Any combination of repairs, reconstruction, . . . that alteration affects the external dimensions of the structure. The term does not, however, include either: (1) Any project for improvement of a structure to correct existing violations of state or local health, sanitary, or safety code specifications which have been previously identified by the local code enforcement official and which are the minimum necessary to assume safe living conditions; or . . . Lowest Floor: The lowest floor of the lowest enclosed area (including basement). An unfinished or flood resistant enclosure . . . of this regulation. Variance: A grant of relief by a community from the terms of the floodplain management regulation that allows construction in a manner otherwise prohibited and where specific enforcement would result in unnecessary hardship. Once these revisions are made to the Town of Simsbury’s Floodplain Zone Regulations and the community formally adopts these revisions and the new effective FIRM and FIS, the municipality will be fully compliant with program standards. PLAN OF CONSERVATION AND DEVELOPMENT (POCD) CONSISTENCY When considering zoning text amendments, it is recommended that the amendments be reviewed for policy consistency with the Town of Simsbury’s POCD. Chapter 4 of the document, Protect Natural Resources & Enhance Ecological Health, includes Policy D., “Preserve and protect watercourses, wetlands, and floodplains and their functions.” Staff finds that the proposed text amendments to be consistent with this policy goal.
Page 5 · open in PDF
Staff would also like to note to the Planning Commission that further amendments to the Simsbury Floodplain Regulations are expected to be proposed as part of the full zoning regulation re-write project that is underway. Any revisions will be reviewed with CTDEEP to ensure it meets the federal flood standards.
Page 6 · open in PDF
79 Elm Street
Hartford, CT 06106-5127
860.424.3000
An Affirmative Action/Equal Opportunity Employer
portal.ct.gov/DEEP
May 19, 2026
George McGregor
Director of Planning & Community Development
Town of Simsbury
Town Hall
933 Hopmeadow Street
Simsbury, CT 06070
RE: Comprehensive Review of the Town of Simsbury Zoning Regulations, Section 6 Floodplain Zone
Dear Mr. McGregor:
On June 29, 2023, the Federal Emergency Management Agency (FEMA) presented your community with
new preliminary Flood Insurance Rate Maps (FIRM) as part of the Farmington River watershed study in
Hartford County. These maps are currently scheduled to become effective on November 13, 2026. In
order for your community to remain eligible to participate in the National Flood Insurance Program
(NFIP), the Town of Simsbury must adopt revised regulations for development in designated FEMA
floodplains that meet or exceed the minimum federal standards of 44 CFR 60.3 prior to the effective date
of the community’s new FIRM. FEMA issued its Letter of Final Determination (LFD) dated May 13,
2026 to the Town of Simsbury outlining these requirements and providing the new effective map date.
In order to assist the community in this map revision process, the CTDEEP has reviewed your
community’s existing floodplain management regulations for compliance with 44 CFR 60.3. The review
indicated that revisions to the community’s existing floodplain regulations are needed in order to maintain
minimum compliance with the NFIP minimum standards.
The following comments were generated as a result of the recent review and are presented in the order of
your current regulations. Comments or words written in bold or strike-through text indicate the
definition, section, or wording is required for minimum compliance with FEMA regulations and recently
adopted state floodplain management requirements. Text in italics is for explanation purposes.
Section 6.4 Identification of the Special Flood Hazard Area
Please update the dates as shown in the bold text below.
The Special Flood Hazard Areas (SFHA) identified by the Federal Emergency Management Agency
(FEMA) in its Flood Insurance Study (FIS) for Hartford County, Connecticut, dated November 13,
2026, and accompanying Flood Insurance Rate Maps (FIRM), dated November 13, 2026 (Panels
09003C0 167G, 169G, 188G, 189G, 190G, 191G, 192G, 193G, 194G, 307G, 326G, 327G, 328G,
329G, 331G, 332G, 333G), and other supporting data applicable to the Town of Simsbury, and any
subsequent revisions thereto, are adopted by reference into this regulation. Since mapping is legally
adopted by reference into this regulation it must take precedence when more restrictive until such time as
a map amendment or map revision is obtained from FEMA.
Page 7 · open in PDF
portal.ct.gov/DEEP
Section 17.4 Definitions – Flood Definitions
Please update the definitions below by adding or updating with the bold text provided, or remove
strikethrough text. Please add the missing definition for “Variance”.
Improvement, Substantial: Any combination of repairs, reconstruction, . . . that alteration affects the
external dimensions of the structure. The term does not, however, include either: (1) Any project for
improvement of a structure to correct existing violations of state or local health, sanitary, or safety code
specifications which have been previously identified by the local code enforcement official and which are
the minimum necessary to assume safe living conditions; or . . .
Lowest Floor: The lowest floor of the lowest enclosed area (including basement). An unfinished or flood-
resistant enclosure . . . of this regulation.
Variance: A grant of relief by a community from the terms of the floodplain management
regulation that allows construction in a manner otherwise prohibited and where specific
enforcement would result in unnecessary hardship.
Once these revisions are made to the Town of Simsbury’s Floodplain Zone Regulations and the
community formally adopts these revisions and the new effective FIRM and FIS, the municipality will be
fully compliant with program standards. Please provide this office with a draft copy of the revised
regulations at least one month prior to formal adoption by the Town in order to check that all
required revisions have been made. With those revisions, please provide a schedule for public hearing
and adoption. Once the revised regulations are adopted, this office will need a certified copy to forward
to FEMA Region I.
Thank you for your attention and cooperation in this matter. If you have any questions regarding this
review or the specific requirements discussed in this letter, or would like an electronic version of our
model floodplain regulations from where the language for the above stated comments had been cited or a
copy of our higher regulatory standards developed for use with the model floodplain regulations, please
contact me by telephone at (860) 424-3537, or by email at diane.ifkovic@ct.gov.
Sincerely,
Diane Ifkovic
Diane Ifkovic
State NFIP Coordinator
Land & Water Resources Division
cc: Wendy Mackstutis, First Selectman
Marc S. Nelson, Town Manager
Brittany MacGilpin, Assistant Town Planner
Joseph Hollis, Code Compliance Officer
Ryan Ziemnicki, Land Use Specialist
Christopher Markesich, FEMA Region I
File: Town of Simsbury Community File: Ordinance/Regulation Minutes: archived copy, SHA-256 e7af0f882040…. Agenda: archived copy, SHA-256 1f8a2641631b…. Packet: archived copy, SHA-256 1db8da609606….