CT Public Docs Tracker

Towns / Simsbury / Planning Commission / Jul 14, 2026

Planning Commission, Jul 14, 2026

Simsbury minutes posted

Documents

TypeDocumentPagesOpen
minutes Planning Commission Minutes 2 PDF download · town site
agenda Planning Commission Agenda 1 PDF download · town site
packet Planning Commission Agenda (packet) 78 PDF download · town site

Summary

Only a meeting packet is posted. Packets (the supporting documents) are archived and searchable but not summarized; open the PDF to read it.

Full text of the documents

View the minutes PDF on this page (Planning Commission Minutes) Open the PDF
Text of the minutes (Planning Commission Minutes, 2 pages)

Page 1 · open in PDF

 
 
 
 
   
   
 
 
 
Page 1 of 2 
 
Planning Commission 1 
Regular Meeting 2 
July 14, 2026 – 7:00 P.M. 3 
Simsbury Public Library – FSPL Program Room 4 
725 Hopmeadow Street, Simsbury, CT 06070 5 
 6 
MINUTES 7 
 8 
I. CALL TO ORDER – Secretary Rice called the meeting to order at 7:02 P.M. 9 
 10 
Present: Secretary, William Rice; Commission Members: Nicholas Criscitelli and 11 
Marcus Furze; Alternate Commission Member , Paul S. Sullivan, Sr.; and Planning 12 
Director, George McGregor.  13 
 14 
Absent: Chair, Erin Leavitt -Simth; Commission Members: Holly Beum  and Julie 15 
Eaton; Alternate Commission Members: Donald Colantonio and Peter Harrison.  16 
 17 
Seating of Alternates: Commissioner Sullivan was appointed as a regular member for 18 
tonight’s meeting.  19 
 20 
II. APPROVAL OF MINUTES 21 
 22 
May 26, 2026, Special Meeting and Joint Meeting 23 
 24 
MOTION: Commissioner Sullivan made a motion, seconded by Commissioner 25 
Criscitelli, to approve the Minutes of the May 26, 2026 Special Meeting and Joint 26 
Meeting as written. The motion carried unanimously (4-0-0). 27 
 28 
III. GENERAL COMMISSION BUSINESS 29 
 30 
Referrals from the Zoning Commission  31 
 32 
ZC #26-18, An application of Dorset Crossing LLC, Owner, Dwight Merriam, Agent, 33 
pursuant to Section 8 of the Zoning Regulations for a zone change and amendment to 34 
the Master Development Plan to allow a car wash facility at 10 Dorset Crossing 35 
(Assessor’s Map Block Lot I04 403 13C-F), Planned Area Development (PAD) Zone. 36 
 37 

Page 2 · open in PDF

  
Page 2 of 2 
 
Attorney Dwight Merriam, FACIP, Esq; Civil Engineer, Brandon Handfield, P.E. of 38 
Yantic River Consultants, LLC; Architect, Rocco Petitto, AIA of QA+M Architecture; 39 
and Landscape Architect, Biff Schechinger, ASLA presented  the proposed car wash 40 
facility. The Commission asked several follow-up questions and discussed  41 
 42 
MOTION: Commissioner Criscitelli made a motion, seconded by  Commissioner 43 
Furze, that the Planning Commission forward  a NEGATIVE referral to the Zoning 44 
Commission for ZC #26-18 as it has potential detrimental impacts to the aquifer, local 45 
water supply, environment, and traffic, none of which align with the POCD. Secretary 46 
Rice and Commissioner Sullivan opposed the motion. The motion failed (2-2-0). 47 
 48 
MOTION: Secretary Rice made a motion, seconded by Commissioner Furze, that the 49 
Planning Commission directs Town Staff to prepare a memo transmitting a split referral 50 
to the Zoning Commission. The motion carried unanimously (4-0-0). 51 
 52 
IV. ADJOURNMENT 53 
 54 
MOTION: Secretary Rice made a motion, without objection, to adjourn the meeting 55 
The motion carried unanimously (4-0-0). 56 
 57 
Secretary Rice adjourned the meeting at 8:49 P.M. 58 
 59 
Respectfully submitted,  60 
 61 
Amanda Blaze 62 
Commission Clerk 63 
View the agenda PDF on this page (Planning Commission Agenda) Open the PDF
Text of the agenda (Planning Commission Agenda, 1 page)

Page 1 · open in PDF

Planning Commission Agenda
PC AGENDA 7-14-26.PDF
ZC 26-18 Dorset Crossing Master Plan Amendment
ZC 26-11 DORSET CROSSING CAR WASH PRELIMINARY MASTER PLAN 
CHANGE PC STAFF MEMO.PDF
ZC 26-18 10 DORSET CROSSING APPLICATION AND PROJECT 
NARRATIVES.PDF
ZC 26-18 10 DORSET CROSSING ARCHITECTURAL PLANS.PDF
ZC 26-18 10 DORSET CROSSING MASTER DEVELOPMENT PLAN.PDF
ZC 26-18 10 DORSET CROSSING REVISED SITE PLAN AND SITE 
DETAILS.PDF
ZC 26-18 10 DORSET CROSSING TRAFFIC STUDY.PDF
1.
Documents:
2.
Documents:
View the packet PDF on this page (Planning Commission Agenda (packet)) Open the PDF
Text of the packet (Planning Commission Agenda (packet), 78 pages)

Page 1 · open in PDF

Planning Commission Agenda
PC AGENDA 7-14-26.PDF
ZC 26-18 Dorset Crossing Master Plan Amendment
ZC 26-11 DORSET CROSSING CAR WASH PRELIMINARY MASTER PLAN 
CHANGE PC STAFF MEMO.PDF
ZC 26-18 10 DORSET CROSSING APPLICATION AND PROJECT 
NARRATIVES.PDF
ZC 26-18 10 DORSET CROSSING ARCHITECTURAL PLANS.PDF
ZC 26-18 10 DORSET CROSSING MASTER DEVELOPMENT PLAN.PDF
ZC 26-18 10 DORSET CROSSING REVISED SITE PLAN AND SITE 
DETAILS.PDF
ZC 26-18 10 DORSET CROSSING TRAFFIC STUDY.PDF
1.
Documents:
2.
Documents:

Page 2 · open in PDF

AGENDA 
PLANNING COMMISSION – REGULAR MEETING 
Tuesday, July 14, 2026 at 7:00 pm 
Simsbury Public Library – FSPL Program Room 
725 Hopmeadow Street, Simsbury, CT 06070 
I. CALL TO ORDER  
Seating of Alternates 
II. APPROVAL OF MINUTES 
May 26, 2026 Special Meeting 
May 26, 2026 Joint Special Meeting  
III. GENERAL COMMISSION BUSINESS 
Referrals from the Zoning Commission 
ZC #26-18, An application of Dorset Crossing LLC, Owner, Dwight Merriam, 
Agent, pursuant to Section 8 of the Zoning Regulations for a zone change and 
amendment to the Master Development Plan to allow a car wash facility at 10 
Dorset Crossing (Assessor’s Map Block Lot I04 403 13C-F), Planned Area 
Development (PAD) Zone. 
IV. OTHER BUSINESS 
V. ADJOURNMENT

Page 3 · open in PDF

Marc S. Nelson, MPA George K. McGregor, AICP
Town Manager Director
PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT
933 Hopmeadow St. Tel. (860) 658-3245 
Simsbury, CT 06070 gmcgregor@simsbury-ct.gov 
MEMORANDUM 
To:  Simsbury Planning Commission 
From: George K. McGregor, AICP 
Date:  July 14, 2026 
Subject: ZC 26-18, Dorset Crossing Master Plan Change, Preliminary 
Review 
Application ZC 26-18 of Dorset Crossing LLC, owner, Dwight Merriam Esq., 
applicant, for formal Application Review to amend the Master Development Plan at 
Dorset Crossing to include a Car Wash Facility at 10 Dorset Crossing, (Assessor’s 
Map Block Lot I04 403 13C-F), Planned Area Development (PAD) zone. 

Page 4 · open in PDF

2 
Dorset Crossing is a Planned Area Development (PAD), established in 2013 with a 
mix of commercial and residential uses. The project was amended in 2022 and 2023 
and currently allows 27,000 sq.ft. of commercial and 360 multi-family residential 
homes. The development is partially constructed: 
Use Type LOT Density Constructed
Mixed Use Retail/Medical Office A 15,000 sf Yes 
Residential Multi-Family B 168 units Yes 
Special Needs Multi-Family C 48 units Yes 
Residential Multi-Family D 30 units NO 
Mixed Use/Retail F 12,000 sf NO 
Residential Multi-Family G 42 units NO 
Residential Multi-Family H 72 units NO 
The Applicant proposes to amend the area described as “Lot F” by replacing two 
proposed buildings (12,000 sq.ft. of “retail/office”) with a 7,275 sq.ft. car wash 
facility. A “car wash” is defined separately in the zoning regulations and is not 
generally included along with other retail uses. Thus, the amendment to add the 
use constitutes a Master Development Plan change. 
Current conceptual plan alongside proposed: 
Having completed the first stage, a preliminary, non-binding review, the application 
is now a Master Plan/Zone Change application with a corresponding Site Plan. With 
this submission the Applicant requests formal review and action. The Application 
was accepted on July 6, 2026, and will be forwarded for referral to the Planning 
Commission (July 14, 2026) and the Design Review Board (July 20, 2026).  

Page 5 · open in PDF

3 
The Application is scheduled for a public hearing at the Zoning Commission on July 
20, 2026.  The master plan submission includes a site plan, traffic study, 
architectural elevations and other relevant materials. 
The Planning Commission role under Connecticut State Statute is to review the 
Master Plan/Zone Change application in terms of consistency and conformance with 
the policies of the Plan of Conservation and Development. 
GKM 

Page 6 · open in PDF

Page 7 · open in PDF

1
Diamond Sparkle Car Wash at Dorset Crossing 
Master Plan Change, Text Amendment, and Site Plan
This is the final step of the three-part process for approving a new use in the Dorset Crossing 
Planned Area Development (PAD) zone.
The proposal is to amend the Master Development Plan at Dorset Crossing and approve a site 
plan to enable development of a car wash at 10 Dorset Crossing, (Assessor’s Map Block Lot I04 403 
13C-F), Planned Area Development (PAD) zone. The parcel is known as Lot F.
In 2013, Dorset Crossing was approved as a Planned Area Development (PAD) with a mix of 
commercial and residential uses. The project mix was amended in 2022 and 2023 and currently allows 
27,000 sq. ft. of commercial and 360 multi-family residential homes.
The application proposes to amend the PAD zoning for “Lot F” to replace the current two- 
building, 12,000 sq. ft. of “retail/office” concept (approved but never developed) with a substantially 
smaller 7,275 sq. ft. car wash facility. 
A car wash is a permitted use as required by Section 8.1C of the PAD regulations: 
A. Permitted Uses
Any use(s) permitted as of right or by Special Permit or Special Exception in the Simsbury Zoning 
Regulations are eligible for inclusion in a PAD and may be permitted in a Planned Area 
Development Zone. Such uses may be combined in a Mixed Use Development in accordance with 
the Development Plan Standards set forth in this Section.

Page 8 · open in PDF

2
The car wash use is a marked improvement over the current approved use in nearly every  
respect:
1. The access plan will eliminate the curb cut on Dorset Crossing Drive, 
eliminating the conflict in turning movements with the existing driveway.
2. The impervious surface is reduced by nearly 12%.
3. The number of parking spaces required is greatly reduced. 
4. The landscaping will have 100% native vegetation. 
5. The side yard in the current use is 9 feet; the proposed use has over 50 feet.  
6. The front yard for the building in the current approved use is a scant 9 feet; 
the  car wash is 60 feet, nearly 7 times greater.
7. The building area is reduced by over 40%.
8. Even with the proposed hotel, on the adjacent parcel, the combined 
development traffic is still below the original approved peak hour volumes 
of the originally approved development
The proposed car wash is consistent with the Plan of Conservation and Development and 
meets the demand in market area of a car wash utilizing the latest technology and providing unequaled 
customer service.  It is an important and needed use for the many, and an increasing number of, 
residents in Simsbury living in multifamily developments. 
And, finally, and perhaps of overarching merit for this proposal, is the design, not only in the 
site engineering aspects noted above in terms of reducing the impact over the existing, approved use 
of Lot F, but the exceptionally attractive architectural design by a preeminent area firm, decidedly not 
the typical “out-of-the-box” design that comes with the car wash franchise operations with hundreds 
of the same car washes, all the same.  This unique, site-specific, sensitive to its neighbors, and 
technology supporting design is nonpareil.
June 30, 2026

Page 9 · open in PDF

Page 10 · open in PDF

A3.01
A3.1
2
A3.0 2
A3.1
1
30' - 0"15' - 0"22' - 0"14' - 8"11' - 4"
6' - 0"
4' - 0"
45' - 0" 38' - 0" 24' - 0"
2' - 0" 6' - 0"
10' - 0" 26' - 0" 19' - 0" 70' - 0"
30' - 0"15' - 0"EQEQ14' - 8 1/2"25' - 4"
125' - 0"
107' - 0"
4' - 8"
AUTOMATIC SOFT TOUCH
AUTOMATIC TOUCHLESS
OVERSIZE SELF-
SERVICE
SELF-SERVICE
DETAILING BAYS
EQUIPMENT ROOM
OFFICE
22' - 2"
29' - 2"
N
195 Scott Swamp Road
Farmington, CT 06032
qamarch.com
Issue Dates:
Project #:
NOT FOR CONSTRUCTION 
ISSUED FOR REVIEW ONLY
E:\REVIT LOCAL\DSCW Mdl2_rpetitto.rvt6/29/2026 4:32:20 PM
A1.1
FIRST FLOOR PLAN
MUNICIPAL REVIEW
05.04.2026
QAM25090
DIAMOND
SPARKLE CAR
WASH
PROJECT DESCRIPTION:
SIMSBURY, CT
Revisions

Page 11 · open in PDF

8 1/2" / 1'-0" 8 1/2" / 1'-0"
1'-1" / 1'-0"
1'-1" / 1'-0"
8 1/2" / 1'-0"8 1/2" / 1'-0"
8 1/2" / 1'-0"
8 1/2" / 1'-0"8 1/2" / 1'-0"
8 1/2" / 1'-0" 8 1/2" / 1'-0"
1'-1" / 1'-0"
1'-1" / 1'-0"
1'-1" / 1'-0"
1'-0" / 1'-0"1'-0" / 1'-0"
1'-1" / 1'-0"
9" / 1'-0"
9" / 1'-0"
ARCHITECTURAL ASPHALT SHINGLES
ALUMINUM GUTTER TYP
ALUMINUM GUTTER TYP
ALUMINUM GUTTER TYPALUMINUM GUTTER TYP
ALUMINUM GUTTER TYP
ARCHITECTURAL ASPHALT SHINGLES
ARCHITECTURAL ASPHALT SHINGLES
STANDING SEAM METAL ROOFING
N
195 Scott Swamp Road
Farmington, CT 06032
qamarch.com
Issue Dates:
Project #:
NOT FOR CONSTRUCTION 
ISSUED FOR REVIEW ONLY
E:\REVIT LOCAL\DSCW Mdl2_rpetitto.rvt6/29/2026 4:32:23 PM
A1.4
ROOF PLAN
MUNICIPAL REVIEW
05.04.2026
QAM25090
DIAMOND
SPARKLE CAR
WASH
PROJECT DESCRIPTION:
SIMSBURY, CT
Revisions
1/8" = 1'-0"A1.4
1 ROOF PLAN

Page 12 · open in PDF

ARCHITECTURAL ASPHALT SHINGLES
ALUMINUM GUTTER TYP
STANDING SEAM 
METAL ROOFING
WHITE PVC TRIM TYP
WHITE PVC TRIM TYP
SPLIT FACED CMU TYP
BOARD AND BATTEN 
VINYL SIDING AT 
GABLE INSETS TYP
HARDIE CLAPBOARD 
SIDING
BOARD AND BATTEN 
VINYL SIDING AT 
GABLE INSETS TYP
ALL SIGNAGE 
SHOWN AT 1'6" HIGH
TO MIDPOINT
26' - 7" FROM GRADE
ARCHITECTURAL ASPHALT SHINGLES
ALUMINUM GUTTER TYP
STANDING SEAM 
METAL ROOFING
WHITE PVC TRIM TYP
WHITE PVC TRIM TYPSPLIT FACED CMU TYP
BOARD AND BATTEN 
VINYL SIDING AT 
GABLE INSETS TYP
HARDIE CLAPBOARD 
SIDING
BOARD AND BATTEN 
VINYL SIDING AT 
GABLE INSETS TYP
ALL SIGNAGE 
SHOWN AT 1'6" HIGH
14' - 0" TYP
N
195 Scott Swamp Road
Farmington, CT 06032
qamarch.com
Issue Dates:
Project #:
NOT FOR CONSTRUCTION 
ISSUED FOR REVIEW ONLY
E:\REVIT LOCAL\DSCW Mdl2_rpetitto.rvt6/29/2026 4:32:25 PM
A3.0
ELEVATIONS
MUNICIPAL REVIEW
05.04.2026
QAM25090
DIAMOND
SPARKLE CAR
WASH
PROJECT DESCRIPTION:
SIMSBURY, CT
Revisions
1/8" = 1'-0"A3.0
1 ENTRY (EAST)
1/8" = 1'-0"A3.0
2 EXIT/DETAIL BAY (WEST)

Page 13 · open in PDF

ENTER ENTER ENTER EXIT
ARCHITECTURAL ASPHALT SHINGLES
ALUMINUM GUTTER TYP
STANDING SEAM 
METAL ROOFING
WHITE PVC TRIM TYP
WHITE PVC TRIM TYPSPLIT FACED CMU TYP
BOARD AND BATTEN 
VINYL SIDING AT 
GABLE INSETS TYP
HARDIE CLAPBOARD 
SIDING
BOARD AND BATTEN 
VINYL SIDING AT 
GABLE INSETS TYP
ALUMINUM STOREFRONT TYP
ENTEREXIT
ARCHITECTURAL ASPHALT SHINGLES
ALUMINUM GUTTER TYP
STANDING SEAM 
METAL ROOFING
WHITE PVC TRIM TYP
WHITE PVC TRIM TYPSPLIT FACED CMU TYP
HARDIE CLAPBOARD 
SIDING
BOARD AND BATTEN 
VINYL SIDING AT 
GABLE INSETS TYP
ALUMINUM STOREFRONT TYP
WHITE PVC 
TRIM TYP
N
195 Scott Swamp Road
Farmington, CT 06032
qamarch.com
Issue Dates:
Project #:
NOT FOR CONSTRUCTION 
ISSUED FOR REVIEW ONLY
E:\REVIT LOCAL\DSCW Mdl2_rpetitto.rvt6/29/2026 4:32:27 PM
A3.1
ELEVATIONS
MUNICIPAL REVIEW
05.04.2026
QAM25090
DIAMOND
SPARKLE CAR
WASH
PROJECT DESCRIPTION:
SIMSBURY, CT
1/8" = 1'-0"A3.1
2 TOUCHLESS/SELF SERVICE BAY (NORTH)
1/8" = 1'-0"A3.1
1 OFFICE/MECH ROOM (SOUTH)
Revisions

Page 14 · open in PDF

S
S
S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
WG
WG
WG
WG
WG
S
WG
GG
WG
S
W
S
WG
S
S
GG
S
?
EE
WG
SEE NOTE #3
LINE
PROPERTY
FORMER
2622
CL&P
2623
CL&P
234
CL&P
3572
CL&P
4362
SNET
235
CL&P
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
C
C
C
FLAG POLE
D
G
A
TE
GRAVEL DRIVE
CONC. WALK
CONC. WALK
connection (typ.)
access/roadway 
Possible future 
connection (typ.)
access/roadway 
Possible future  
Total 24 Apartments 3 Story
BUILDING #4
Mixed Use Retail/Medical Office
Total 15,000 Square Feet 1 Story
BUILDING #2 30
40
13A
Total 24 Apartments
3 Story
BUILDING #5
50
Total 24 Apartments 3 StoryBUILDING #6
70
Signal
Traffic
VE
DR
IVE
W
A
Y
DRIVE
SAX
TO
N
B
R
OOK
DR.
ROAD
C
IRCLE
K
N
O
L
LW
O
O
D
C
E
N
T
E
R
-
W
O
O
D
R
D
.
WILLARD
GORDON
ST.
ST.
ELY
LANE
Saxton
Hoskins
ROAD
WESCOTT
ROAD
Brook
R
IVE
R
S
T
A
T
E
O
F
C
O
N
N
E
C
T
IC
U
T
315
W
E
S
T
WE
K
IL
BO
U
R
N
HO
W
A
R
D
S
T
.
R
D
.
(I
NA
C
T
IV
E
)
HOSKINS
SIMSBURY
AIRPORT
TULLER
DR.
WOLC
O
TT
SIMSBURY PINES
L
AU
R
IE
-
J
O
E
W
AY
47.02
47.45
47.54
47.93
48.04
48.21
0.85
0.92
1.04
1.3
EGDIRBRETSAC GNISSORC
TESROD CROSSING
S
T
R
E
E
T
47.61
47.71
DATE DESCRIPTION
                                                     
PROFESSIONAL SEAL
SHEET
DATE
REVISED
 4/30/26
 6/26/26
OFCONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
   1 6   
REVISION SUMMARY
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
PREPARED FOR
SCALE:   1" =    40'
PROJECT NUMBER:
00222 - 001  
 40 0  40  80  120
           DIAMOND SPARKLE CAR WASH LLC           
                359 LEBANON AVENUE                
               COLCHESTER, CT 06415               
                                                  
                                                  
                                                  
                DORSET CROSSING LLC               
                30 DORSET CROSSING                
                SIMSBURY, CT 06070                
                            SIMSBURY, CT
             DORSET CROSSING PAD            
           MASTER DEVELOPMENT PLAN          
                     PREPARED FOR                     
        DIAMOND SPARKLE CAR WASH LLC, APPLICANT       
                 TITLE SHEET                
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)        
DORSET          CROSSING          DRIVEMAP REFERENCES:
HO
P
M
E
ADO
W
 S
T
R
EET
 (C
T
 R
OU
TE
 10
 &
 202
)
BUILDING #1
CAR WASH
TOTAL 7,275 SF±
1 STORY
LOT A
67 SPACES
LOT F
LOT H
148 SPACES
INDEX OF SHEETS
TITLE SHEET                                                                         01    
       MASTER DEVELOPMENT PLAN      
SCALE:   1" =  1000'
                     APPLICANT                                                                                             OWNER                      
SCALE:   1" =  1000'
      ZONING LOCATION MAP     
       SITE LOCATION MAP      
DESCRIPTION SHEET NUMBER
DEVELOPMENT LAYOUT PLAN - LOT F                                                     02    
GRADING & DRAINAGE PLAN                                                             03    
UTILITY PLAN                                                                        04    
LIGHTING PLAN                                                                       05    
EROSION & SEDIMENTATION CONTROL PLAN                                                06    
                                                                                          
                                                                                          
                                                                                          
                                                                                          
                                                                                          
                                                                                          
         DORSET CROSSING PAD        
                  SITE MODIFICATION - LOT F                 
     10 DORSET CROSSING (M/B/L I04/403/13C-F)     
               SIMSBURY, CONNECTICUT              
LOT F
SITE
(HATCHED)
NDDB AREA
APA LIMIT
PAD
SITE
10
TOWN ROAD MAP OBTAINED FROM THE CONNECTICUT DEPARTMENT OF TRANSPORTATION DATABASE.4.
ADMINISTRATION (NOAA) OF THE US DEPARTMENT OF COMMERCE DATABASE.
ELEVATION DATA OBTAINED FROM MAP REFERENCE 1 AND NATIONAL OCEANIC AND ATMOSPHERIC3.
ORTHOIMAGERY SPRING 2025 FROM NEARMAP.2.
HESKETH & ASSOCIATES, INC.
DATE: 09-16-2011 AS REVISED THROUGH 10/10/11, SCALE: 1" = 40', SHEET UT-1, PREPARED BY F.A.
"UTILITY PLAN PREPARED FOR DORSET CROSSING, HOWMEADOW STREET, SIMSBURY, CONNECTICUT"2.
09-22-2023, SCALE: 1" = 100', PREPARED BY F.A. HESKETH & ASSOCIATES, INC.
DORSET CROSSING DRIVE, SIMSBURY, CONNECTICUT", DATE: 12-03-2021 AS REVISED THROUGH
"DORSET CROSSING PAD, MASTER DEVELOPMENT PLAN PREPARED FOR DORSET CROSSING, LLC,1.
16 SPACES

Page 15 · open in PDF

S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
WG
S
S
GG
S
?
2622
CL&P
2623
CL&P
234
CL&P
3572
CL&P
4362
SNET
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
E
E
C
C
T
FLAG POLE
D
CONC. WALK
                            SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE:   1" =    20'
PROJECT NUMBER:
00222 - 001  
 20 0  20  40  60 
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION                       
SHEET
DATE
REVISED
 4/30/26
 6/26/26
OF   2 6   
REVISION SUMMARY
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
             DORSET CROSSING PAD            
           MASTER DEVELOPMENT PLAN          
                     PREPARED FOR                     
        DIAMOND SPARKLE CAR WASH LLC, APPLICANT       
       DEVELOPMENT LAYOUT PLAN - LOT F      
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)        
LP
LP
L
P
L
P
LP
LP
L
P
L
P
LP
LP
LP
LP
LP
VAC
VAC
VAC
VAC
H
O
P
M
E
A
D
O
W
 S
T
R
E
E
T
 (C
T
 R
O
U
T
E
 10 &
 202)
DORSET          CROSSING          DRIVE
V
A
C
V
A
C
V
A
C
V
A
C
V
A
C
V
A
C
V
A
C
EQUIPMENT
OFFICE
AUTOMATIC TUNNEL
TOUCHLESS
SELF 1
SELF 2
PLANNED AREA DEVELOPMENT (PAD)ZONE:
CAR WASHUSE: 
50.6' SY
MATCH APPROVED
PARKING/DRIVE SETBACK
5'
10'
MATCH APPROVED
PARKING/DRIVE SETBACK
21.8' R
Y
AND ACCESS PLAN HAS BEEN APPROVED.
PARKING SIDE AND REAR YARD SETBACKS MAY BE REDUCED TO 0 FEET WHERE A UNIFIED PARKING2.
APPROVED INFORMATION OBTAINED FROM MAP REFERENCE 1, SHEET MA-1.1.
ZONING NOTES:
10'
10'
10'
45'-0"
25'-4"
25'-4"
38'-0"
11'-4"
24'-0"
70'-0"
6'-0"
22'-0"
10'-0"
45'-0" 30'-0"
26'-0"
19'-0"
15'-0"
11'-4"
14'-8"
22'-0"
2'-0"
6'-0"
COMPLIES< 40 FTUNKNOWN40 FTBLDG. HEIGHT
REDUCTION35,426 SF40,000 SFN/AIMP. COVERAGE
INCREASE7,275 SF7,000 SFN/ABLDG. COVERAGE
REDUCTION7,275 SF12,000 SFN/ABLDG. AREA
NO CHANGE5 FT5 FT10 FTREAR YARD[2]
NO CHANGE5 FT5 FT10 FTSIDE YARD[2]
NO CHANGE10 FT10 FT10 FTFRONT YARD
PARKING SETBACKS
COMPLIES21.8 FT±21.1 FT±20 FTREAR YARD
N/AN/AN/A10 FTACCESSORY
COMPLIES50.6 FT±9.0 FT±20 FTPRINCIPAL
SIDE YARD
COMPLIES23.7 FT±20 FTCANOPY
COMPLIES60.8 FT±20.0 FT±20 FTBUILDING
FRONT YARD
NO CHANGE460.7 FT±460.7 FT±100 FTLOT FRONTAGE
NO CHANGE47,419 SF (1.08 AC)47,419 SF (1.08 AC)10,000 SFLOT AREA
NOTESPROPOSEDAPPROVED[1]REQUIREDITEM
2'
PARKING/DRIVE SETBACK
5.67'
10'
10'
10'
10'
10'
10'
10'
10'
16'
16'
62.4' SY
60.8' F
Y
 M
A
IN
 B
U
IL
D
IN
G
A
B
C
D
E
F
G
H
I
J
LEGEND
K
L
Mixed Use Retail/Medical Office
Total 15,000 Square Feet
1 Story
BUILDING #2
CONNECTION (TYP.)
ACCESS/ROADWAY
POSSIBLE FUTURE
A
24'
18'
18'
13'
15'
13'
21.33'
13'
A
A
A
A
21.33' A
A
2'
18'
B
B
B
C
D
G
G
G
G
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
G
G
H
I
J
TRASH ENCLOSURE
STOP SIGN
HANDICAP PARKING SIGN
HANDICAP RAMP (8.33% MAX.)
CONCRETE SIDEWALK
CONCRETE CURB & WALK MONO.
EXT. CONCRETE CURB (START/END)
BIT. CONCRETE CURB (START/END)
STOP BAR (12" WHITE)
LANE STRIPING (4" WHITE)
PARKING PAINT STRIPING (4" WHITE)
BITUMINOUS CONCRETE DRIVE
K
L
E
X
IS
T
IN
G
 D
R
IV
E
W
A
Y
AREA = 750 SF±
CANOPY LIMITS
PAY STATION
LIGHT FIXTURE (TYP. OF 12)
15' HIGH POLE MOUNTED
EXISTING LIGHT FIXTURE (TYP.)
HANDICAP PARKING MARKING
WALL PACK (FULL CUTOFF)
POLE MOUNTED LIGHT FIXTURE
HAYBALE
SILT FENCE
TELECOMMUNICATIONS
ELECTRIC
GAS SERVICE
WATER
SANITARY SEWER
CURTAIN/SLOPE/WALL DRAIN
ROOF LEADER
DRAINAGE PIPE
CONCRETE WALK & CURB MONO.
CONCRETE WALK
SAWCUT PAVEMENT
EDGE OF PAVEMENT W/ CURB
14'-8"
4'-0"
DETAIL
DRAINAGE EASEMENT
EASEMENT
EASEMENT
FAVOR OF CL&P
EASEMENT IN
OF AQUARION
EASEMENT IN FAVOR
TOWN OF SIMSBURY
EASEMENT IN FAVOR OF
8'
8'
9'
9'
9'
13'
A
A
5 S
P
A
C
E
S
 (V
A
C
.)
4 SPACES (VAC.)
18'
COMPLIES1 SP (1 VAN)1 SP (1 VAN)161 SP / 1-25 SPDEVELOPMENT TOTAL
ACCESSIBLE PARKING
COMPLIES16 SPACES5 SPACESTOTAL
11 SPACESN/AN/AN/APATRONS / VACUUM
3 SPACES3 SPACES31 SP / EMP.CAR WASH
2 SPACES2 SPACES2722.5 SP / 500 SFOFFICE
PARKING SPACES
NOTESPROPOSEDREQUIREDUNITSTANDARDITEM
GENERAL SITE NOTES
ACCESSIBLITY REQUIREMENTS.
CONTRACTOR TO CONFIRM WITH LOCAL CODES AND BUILDING INSPECTOR FOR SPECIFIC HANDICAPPED10.
COMPACTION.
GRANULAR BACKFILL. REFER TO GEOTECHNICAL REPORT FOR TYPE OF FILL TO ACHIEVE DESIRED
CONTRACTOR SHALL COMPLETELY FILL ALL TRENCHES WITHIN 5 FEET OF PAVEMENT EDGES WITH9.
TO THE OWNER.
CONSTRUCTION BY THE CONTRACTOR, HIS SUBCONTRACTORS OR SUPPLIERS AT NO ADDITIONAL COST
CONTRACTOR SHALL REPAIR, RESURFACE, RECONSTRUCT OR REFURBISH ANY AREAS DAMAGED DURING8.
ASPHALT. 
WITH FORM 819, TOWN OF SIMSBURY OR DOT STANDARDS WHERE NEW ASPHALT JOINS EXISTING
CONTRACTOR SHALL SEAL EDGE OF EXISTING ASPHALT PAVEMENT WITH TACK COAT IN ACCORDANCE7.
PROJECT LANDSCAPE ARCHITECT.
SEED SHALL BE APPLIED AT THE MINIMUM RATE RECOMMENDED BY THE MANUFACTURER OR THE
CONTRACTOR SHALL SUPPLY AND PLACE STRAW MULCH WHEREVER GRASS SEED HAS BEEN PLACED.6.
1" BELOW TOPS OF CURBS, WALKS, OR PAVEMENT ELEVATIONS WHERE TOPSOIL ABUTS THOSE AREAS.
OR AS DIRECTED BY THE PROJECT LANDSCAPE ARCHITECT.  TOP OF TOPSOIL LAYER SHALL BE PLACED
OTHERWISE NOTED. ALL NEW SEEDED OR SODDED AREAS SHALL HAVE A TOPSOIL LAYER OF 4" MINIMUM
ALL DISTURBED AREAS SHALL BE SEEDED OR SODDED AFTER FINISH GRADING IS COMPLETED UNLESS5.
FEATURES AS NECESSARY.
CONTRACTOR SHALL PROVIDE SMOOTH TRANSITIONS FROM PROPOSED FEATURES TO EXISTING4.
REPRESENTATIVE IMMEDIATELY.
DISCREPANCIES BETWEEN THE PLANS AND ACTUAL FIELD CONDITIONS TO THE OWNER OR OWNER'S
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS AND SHALL REPORT ANY
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO THE START OF CONSTRUCTION.3.
OR OTHER LIMITS AS DEPICTED ON THE PLAN.
ALL DIMENSIONS ARE TO THE EDGE OF PAVEMENT, FACE OF CURBS, OUTSIDE FACE OF THE BUILDING2.
CONSTRUCTION FORM 819 AS APPLICABLE AND THE TOWN OF SIMSBURY STANDARD SPECIFICATIONS.
TRANSPORTATION STANDARD SPECIFICATIONS FOR ROADS, BRIDGES, FACILITIES AND INCIDENTAL
ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE STATE OF CONNECTICUT DEPARTMENT OF1.
23.7' F
Y
 C
A
N
O
P
Y
63.0' F
Y
 M
A
IN
 B
U
IL
D
IN
G
18'
24'
15.5'
F
H
5'
4'
10'
FF = 201.50
AREA = 7,275 SF±
CAR WASH
1 STORY
BUILDING #1
DESIGN BY OTHERS
MONUMENT SIGN
DIAMOND SPARKLE
ZONING TABLE LOT F
PARKING TABLE LOT F
PARKING SPACE REQUIREMENTS PER SECTION 10.2.4USE: 
6 S
P
A
C
E
S
 (2 V
A
C
. / 1 H
A
 V
A
N
)
(TYP. OF 6)
MOUNT VACUUM
DUAL HEAD POST

Page 16 · open in PDF

S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
WG
S
S
GG
S
?
2622
CL&P
2623
CL&P
234
CL&P
3572
CL&P
4362
SNET
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
E
E
C
C
T
FLAG POLE
D
CONC. WALK
                            SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE:   1" =    20'
PROJECT NUMBER:
00222 - 001  
 20 0  20  40  60 
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION                       
SHEET
DATE
REVISED
 5/18/26
 6/26/26
OF   3 6   
REVISION SUMMARY
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
             DORSET CROSSING PAD            
           MASTER DEVELOPMENT PLAN          
                     PREPARED FOR                     
        DIAMOND SPARKLE CAR WASH LLC, APPLICANT       
           GRADING & DRAINAGE PLAN          
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)        
+201.50 
       
        
        
+       
201.50 
        
        
+201.25 
       
        
        
+       
201.25 
        
        
+200.60 
       
        
        
+201.10 
       
        
        
+201.20 
       
        
        
+       
       
        
 201.50 
+       
201.80 
        
        
+200.50 
       
        
        
+       
       
 201.05 
        
+201.20 
       
        
        
+200.10 
       
        
        +               199.20         
+200.70 
       
        
        
+       
200.75 
        
        
+       
201.20 
        
        
+       
       
        
 201.25 
+200.55 
       
        
        
+200.10 
       
        
        
+       
201.05 
        
        
+       
       
        
 200.50 
+       
       
        
 200.50 
+       
       
 199.20 
        
+       
       
        
 200.80 
+       
       
        
 200.80 
+       
200.80 
        
        
+200.85 
       
        
        
+       
       
 201.60 
        
+       
202.00 
        
        
+       
202.00 
        
        
198
200
200
198
200
200
200
202
201
201
201
202
201
LP
L
P
L
P
LP
LP
L
P
L
P
LP
LP
LP
LP
LP
H
O
P
M
E
A
D
O
W
 S
T
R
E
E
T
 (C
T
 R
O
U
T
E
 10 &
 202)
DORSET          CROSSING          DRIVE
Mixed Use Retail/Medical Office
Total 15,000 Square Feet
1 Story
BUILDING #2
CONNECTION (TYP.)
ACCESS/ROADWAY
POSSIBLE FUTURE
DRAINAGE EASEMENT
EASEMENT
FAVOR OF CL&P
EASEMENT IN
OF AQUARION
EASEMENT IN FAVOR
TOWN OF SIMSBURY
EASEMENT IN FAVOR OF
FL = 193.65 (8")
TF = 202.94
EX. SMH
FL = 187.40 (8")
TF = 198.49
EX. SMH
250' - 8" P
V
C
 @
 0.025
FF = 201.50
CAR WASH
1 STORY
BUILDING #1
UTILITY STATEMENT
4455, IN ACCORDANCE WITH CBYD NOTIFICATION PROCEDURES PRIOR TO COMMENCING WORK. 
AUTHORITIES PRIOR TO CONSTRUCTION.  CONTRACTOR TO NOTIFY "CALL BEFORE YOU DIG" AT 1-800-922-
EXISTENCE OF ALL SUCH FEATURES MUST BE FIELD DETERMINED AND VERIFIED BY THE APPROPRIATE
IN NATURE. ADDITIONALLY, OTHER SUCH FEATURES MAY EXIST ON THE SITE. THE SIZE, LOCATION AND
IN THE AREA, EITHER IN-SERVICE OR ABANDONED.  THESE LOCATIONS MUST BE CONSIDERED APPROXIMATE
THIS PLAN SET MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES COMPRISE ALL SUCH UTILITIES
GOVERNMENT AGENCIES, PAROLE TESTIMONY, FIELD SURVEY AND OTHER SOURCES. THE SURVEYOR AND
COMPILED, IN PART, FROM RECORD MAPPING SUPPLIED BY THE RESPECTED UTILITY COMPANIES OR
UNDERGROUND UTILITY, STRUCTURE AND FACILITY LOCATIONS DEPICTED AND NOTED HEREON HAVE BEEN
STUBS PER MAP REF. 2 (VIF)
EXISTING 6" FIRE & 4" DOMESTIC
EXISTING GAS VALVE (VIF)
T
FL(NE) = 196.25 (NEW)
FL(W) = 196.25 (EX.)
TF = 199.10 (NEW)
TF = 198.37 (EX.)
EX. CB-C #F-100
FL(E) = 187.65 (EX.)
TF = 200.70 (NEW)
TF = 201.37 (EX.)
EX. SMH #F-200
FL(W) = 196.32 (EX.)
TF = 200.50 (NEW)
TF = 200.91 (EX.)
EX. CB-C #F-204
FL(S) = 190.88 (EX.)
TF = 201.05 (NEW)
TF = 201.97 (EX.)
EX. SMH #F-201
FL(N) = 190.74 (EX.)
FL(SW) = 191.19 (EX.)
FL(SE) = 190.70 (EX.)
FL(NE) = 196.03 (EX.)
TF = 201.20 (NEW)
TF = 201.88 (EX.)
EX. SMH #F-203
FL(NE) = 191.61 (EX.)
FL(W) = 191.60 (EX.)
TF = 200.10 (NEW)
TF = 200.70 (EX.)
EX. CB-C #F-205
FL(E) = 192.12 (EX.)
FL(S) = 192.09 (EX.)
TF = 199.10 (NEW)
TF = 200.67 (EX.)
EX. CB-C #F-206
@ 0.6%
26 LF - 12" HDPE
FL = 196.40
TF = 199.65
PR. DMH #F-101
@ 0.7%
22 LF - 8" HDPE
FL(E) = 193.80 (24")
FL(W) = 196.55 (12")
TF = 200.05
PR. DMH #F-103
@ 0.9%
110 LF - 12" HDPE
FL(W) = 193.80 (24")
FL(N) = 196.55 (8")
TF = 199.75
PR. DMH #F-104
FL = 197.90 (8")
TF = 200.90
PR. YD #F-106
@ 1.0%
65 LF - 8" HDPE
FL = 197.25 (8")
TF = 200.25
PR. YD #F-105
@ 2.5%
28 LF - 8" HDPE
@ 0.5%
40 LF - 8" HDPE
FL(SE) = 197.80 (NEW)
FL(W) = 197.60 (EX.)
FL(NE) = 197.79 (EX.)
TF = 202.01 (EX.)
EX. CB-C #F-300
FL(N) = 190.73 (EX.)
FL(S) = 190.76 (EX.)
TF = 201.10 (NEW)
TF = 202.01 (EX.)
CONTECH STC 900
EX. STS #F-202
GRADING NOTES
FLOW LINE ELEVATIONS GIVEN AT END OF PIPE SECTIONS.10.
ON THE PLANS.
SEE APPROPRIATE DETAILS TO DETERMINE SUBGRADE ELEVATIONS BELOW FINISH GRADE INDICATED9.
ALL PROPOSED SPOT ELEVATIONS ARE THE FINAL PAVEMENT AND FINAL GRADE ELEVATIONS.8.
AND CORRECT IF ANY, "BIRD BATH" CONDITIONS.
PROVIDE POSITIVE DRAINAGE WITHOUT PONDING. AFTER INSTALLATION, CONTRACTOR TO TEST FOR,7.
PARKING AREAS WILL BE DETERMINED AT THE TIME OF CONSTRUCTION.
NECESSITY FOR SUBDRAINS AND/OR REMOVAL OF ANY UNSUITABLE MATERIAL WITHIN THE PROPOSED
WEIGHT ROLLER TO DETERMINE LOCATIONS OF ANY POCKETS OF UNSUITABLE MATERIAL. THE
AFTER REMOVING PAVEMENT AND/OR STRIPPING TOPSOIL MATERIAL, PROOFROLL WITH A MEDIUM6.
GRANULAR MATERIAL IF WITHIN 5 FEET OF PAVEMENT OR CONCRETE.
TRENCHES FOR ALL STORM DRAIN LINES SHALL BE BACKFILLED COMPLETELY WITH ENGINEERED5.
CONSTRUCTION.
NOTIFY THE UTILITY COMPANY SO A REPRESENTATIVE IS PRESENT TO INSTRUCT AND OBSERVE DURING
COMPANIES.  WHEN EXCAVATING IS AROUND OR OVER EXISTING UTILITIES, THE CONTRACTOR MUST
ON SITE.  ALL VERIFICATIONS (LOCATION, SIZE AND DEPTH) SHALL BE MADE BY THE APPROPRIATE UTILITY
START, OR AS REQUIRED BY GOVERNING UTILITY COMPANY, TO VERIFY IF ANY UTILITIES ARE PRESENT
THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES 72 HOURS BEFORE CONSTRUCTION IS TO4.
AND/OR COMPANIES SO AS NOT TO CAUSE DAMAGE.
EXISTING UTILITY LINES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTORS
THE EXCAVATING CONTRACTOR SHALL TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND3.
REPRESENTATIVE IMMEDIATELY.
DISCREPANCIES BETWEEN THE PLANS AND ACTUAL FIELD CONDITIONS TO THE OWNER OR OWNER'S
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS AND SHALL REPORT ANY
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO THE START OF CONSTRUCTION.2.
BE PERFORMED IN ACCORDANCE WITH THE TOWN OF SIMSBURY STANDARD SPECIFICATIONS.
CONSTRUCTION FORM 819 AS APPLICABLE. WORK WITHIN THE DORSET CROSSING RIGHT-OF-WAY SHALL
TRANSPORTATION STANDARD SPECIFICATIONS FOR ROADS, BRIDGES, FACILITIES AND INCIDENTAL
ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE STATE OF CONNECTICUT DEPARTMENT OF1.
DRAINAGE
STORMWATER O & M
BOTTOM STONE = 192.90±
BOTTOM CHAMBERS = 193.65±
16 CHAMBERS (2 ROWS X 8 UNITS)
SUBSURFACE INFILTRATION SYSTEM
PROPOSED STORMTECH MC-3500
TOP CHAMBERS = 192.29±
BOTTOM CHAMBERS = 187.02±
48 MODULES (4 ROWS X 12 UNITS)
SYSTEM WITH DURA-SKRIM LINER
EXISTING 'RETAIN IT' DETENTION
RL FL = 199.80
RL FL = 199.80
LEADER @ 1.0% (TYP.)
190 LF PVC ROOF
FL(E) = 197.06
FL(W) = 197.01
TF = 201.86
EX. CB-C
FL(SE & NW) = 197.54
FL(N) = 199.23
TF = 202.17
EX. CB-C
FL = 196.13
TF = 199.22
EX. CB-C
FL(W) = 195.74
FL(N) = 195.76
TF = 198.99
EX. CB-C
FL(N) = 192.29
TF = 196.09
EX. CB-C
FL(N) = 192.11
FL(S) = 192.22
TF = 196.01
EX. CB-C
FL = 198.28
TF = 201.04
EX. CB-C
EASEMENT
FL = 197.35
TF = 200.50
48" SUMP W/ HOOD
PR. CB-CL #F-102
FL = 198.00
TF = 200.85
48" SUMP W/ HOOD
PR. CB-CL #F-301
E
X
IS
T
IN
G
 D
R
IV
E
W
A
Y
MANUFACTURER'S RECOMMENDATIONS.
STORMTECH MC-3500 UNITS TO BE INSPECTED AND MAINTAINED IN ACCORDANCE WITH THED.
REMOVE SAND, SALT AND OTHER DEBRIS FROM THE WINTER MAINTENANCE SEASON.
ACCESS DRIVES, PARKING AREAS AND SIDEWALKS SHALL BE SWEPT ANNUALLY EACH SPRING TOC.
DIVERTS FLOW SHALL BE REMOVED AND DISPOSED OF IN AN APPROVED MANNER.
FOLIAGE CLEANUP AND A SECOND TIME DURING SPRING CLEANUP.  ALL DEBRIS THAT OBSTRUCTS OR
INSPECT EACH VEGETATED/LANDSCAPED AREA TWICE ANNUALLY, ONCE IN THE FALL AS PART OFB.
IN AN APPROVED MANNER.
FOLLOWING THE WINTER SEASON.  REMOVE ALL COLLECTED SEDIMENT AND DEBRIS AND DISPOSE OF
INSPECT EACH CATCH BASIN AND STORMWATER TREATMENT STRUCTURE ANNUALLY IN THE SPRINGA.
THE FOLLOWING MAINTENANCE SHALL BE PERFORMED AND A MAINTENANCE LOG COMPLETED.2.
OWNER & PARTY RESPONSIBLE FOR OPERATION AND MAINTENANCE: DIAMOND SPARKLE CAR WASH, LLC1.
MANAGEMENT SYSTEMS FUNCTION AS DESIGNED.
THE FOLLOWING OPERATION & MAINTENANCE PLAN SHALL BE IMPLEMENTED TO ENSURE THAT STORMWATER
LEADER @ 1.0% (TYP.)
165 LF PVC ROOF
FL = 194.15
6" INSERTA TEE
ACCORDANCE WITH THE 2024 STORMWATER QUALITY MANUAL.
TREATMENT HAS BEEN DESIGN AND IMPLEMENTED TO THE MAXIMUM EXTENT ACHIEVABLE INF.
BEEN INSTALLED, AND NO OTHER PRETREATMENT BMP'S ARE FEASIBLE.
CONNECTED TO A DOWNSTREAM SYSTEM WHERE OTHER TREATMENT PRACTICES HAVE ALREADY
A CONTRIBUTING DRAINAGE AREA OF 0.16 ACRES (<0.25), IS IN AN OFFLINE CONFIGURATION, IS
CATCH BASIN #F-301 WILL BE INSTALLED WITH A DEEP SUMP (48") AND A HOOD. THE BASIN HASE.
BEEN INSTALLED, AND NO OTHER PRETREATMENT BMP'S ARE FEASIBLE.
CONNECTED TO A DOWNSTREAM SYSTEM WHERE OTHER TREATMENT PRACTICES HAVE ALREADY
A CONTRIBUTING DRAINAGE AREA OF 0.13 ACRES (<0.25), IS IN AN OFFLINE CONFIGURATION, IS
CATCH BASIN #F-102 WILL BE INSTALLED WITH A DEEP SUMP (48") AND A HOOD. THE BASIN HASD.
CALCULATED WQF RATE OF 1.0 CFS.
MAXIMUM WATER QUALITY FLOW (WQF) TREATMENT RATE OF 1.4 CFS, WHICH EXCEEDS THE
CONTECH STC 900 HYDRODYNAMIC SEPARATOR. THE EXISTING TREATMENT STRUCTURE HAS A
EXISTING 200 SERIES COLLECTION STRUCTURES WILL DISCHARGE THROUGH AN EXISTINGC.
INFILTRATE THE CALCULATED WATER QUALITY VOLUME (WQV) EQUIVALENT TO 1.3" OF RAINFALL.
TO A STORMTECH MC-3500 SUBSURFACE INFILTRATION SYSTEM SIZED TO FULLY RETAIN AND
CLEAN RUNOFF FROM THE ROOF AND ADJACENT LANDSCAPED RAIN GARDENS WILL DISCHARGEB.
ALL CATCH BASINS SHALL HAVE 24" (MIN.) SUMPS EXCEPT AS NOTED.A.
STORMWATER RUNOFF FROM ALL NEW IMPERVIOUS SURFACES WILL BE TREATED AS FOLLOWS:3.
DISCHARGING OFF-SITE AS COMPARED TO THE APPROVED PAD DEVELOPMENT.
THERE WILL BE NO NET INCREASE IN PEAK FLOW RATES FOR THE 1-YEAR THROUGH 100-YEAR STORM2.
SITE VIA CONNECTION TO THE EXISTING COLLECTION SYSTEMS ON SITE.
A SERIES OF ROOF LEADERS, YARD DRAINS, CATCH BASINS & DRAINAGE PIPING AND DISCHARGED OFF
STORMWATER RUNOFF FROM THE PROPOSED DEVELOPMENT OF LOT F WILL BE COLLECTED THROUGH2.
FURNISHING MATERIALS.
THE CONTRACTOR SHALL CONFIRM ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO ORDERING AND/OR
OF THE ORIGINAL DORSET CROSSING PAD MASTER DEVELOPMENT PLAN. SEE MAP REFERENCES 1 & 2.
THE DRAINAGE SYSTEM SERVING LOT F HAS BEEN PARTIALLY INSTALLED AS PART OF THE CONSTRUCTION1.

Page 17 · open in PDF

S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
WG
S
S
GG
S
?
2622
CL&P
2623
CL&P
234
CL&P
3572
CL&P
4362
SNET
2623S
CL&P
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
E
E
C
C
T
FLAG POLE
D
CONC. WALK
                            SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE:   1" =    20'
PROJECT NUMBER:
00222 - 001  
 20 0  20  40  60 
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION                       
SHEET
DATE
REVISED
 5/18/26
 6/26/26
OF   4 6   
REVISION SUMMARY
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
             DORSET CROSSING PAD            
           MASTER DEVELOPMENT PLAN          
                     PREPARED FOR                     
        DIAMOND SPARKLE CAR WASH LLC, APPLICANT       
                UTILITY PLAN                
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)        
+201.50 
       
        
        
+       
201.50 
        
        
+201.25 
       
        
        
+       
201.25 
        
        
+200.60 
       
        
        
+201.10 
       
        
        
+201.20 
       
        
        
+       
       
        
 201.50 
+       
201.80 
        
        
+200.50 
       
        
        
+       
       
 201.05 
        
+201.20 
       
        
        
+200.10 
       
        
        +               199.20         
+200.70 
       
        
        
+       
200.75 
        
        
+       
201.20 
        
        
+       
       
        
 201.25 
+200.55 
       
        
        
+200.10 
       
        
        
+       
201.05 
        
        
+       
       
        
 200.50 
+       
       
        
 200.50 
+       
       
 199.20 
        
+       
       
        
 200.80 
+       
       
        
 200.80 
+       
200.80 
        
        
+200.85 
       
        
        
+       
       
 201.60 
        
+       
202.00 
        
        
+       
202.00 
        
        
198
200
200
198
200
200
200
202
201
201
201
202
201
LP
L
P
L
P
LP
LP
L
P
L
P
LP
LP
LP
LP
LP
H
O
P
M
E
A
D
O
W
 S
T
R
E
E
T
 (C
T
 R
O
U
T
E
 10 &
 202)
DORSET          CROSSING          DRIVE
Mixed Use Retail/Medical Office
Total 15,000 Square Feet
1 Story
BUILDING #2
CONNECTION (TYP.)
ACCESS/ROADWAY
POSSIBLE FUTURE
DRAINAGE EASEMENT
EASEMENT
EASEMENT
FAVOR OF CL&P
EASEMENT IN
OF AQUARION
EASEMENT IN FAVOR
TOWN OF SIMSBURY
EASEMENT IN FAVOR OF
FL = 193.65 (8")
TF = 202.94
EX. SMH
FL = 187.40 (8")
TF = 198.49
EX. SMH
FF = 201.50
CAR WASH
1 STORY
BUILDING #1
ROOM
UTILITY
METER
ELECTRIC
METER
GAS
EXISTING TRANSFORMER
E
X
IS
T
IN
G
 D
R
IV
E
W
A
Y
UTILITY STATEMENT
4455, IN ACCORDANCE WITH CBYD NOTIFICATION PROCEDURES PRIOR TO COMMENCING WORK. 
AUTHORITIES PRIOR TO CONSTRUCTION.  CONTRACTOR TO NOTIFY "CALL BEFORE YOU DIG" AT 1-800-922-
EXISTENCE OF ALL SUCH FEATURES MUST BE FIELD DETERMINED AND VERIFIED BY THE APPROPRIATE
IN NATURE. ADDITIONALLY, OTHER SUCH FEATURES MAY EXIST ON THE SITE. THE SIZE, LOCATION AND
IN THE AREA, EITHER IN-SERVICE OR ABANDONED.  THESE LOCATIONS MUST BE CONSIDERED APPROXIMATE
THIS PLAN SET MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES COMPRISE ALL SUCH UTILITIES
GOVERNMENT AGENCIES, PAROLE TESTIMONY, FIELD SURVEY AND OTHER SOURCES. THE SURVEYOR AND
COMPILED, IN PART, FROM RECORD MAPPING SUPPLIED BY THE RESPECTED UTILITY COMPANIES OR
UNDERGROUND UTILITY, STRUCTURE AND FACILITY LOCATIONS DEPICTED AND NOTED HEREON HAVE BEEN
UTILITY NOTES
WATER NOTES
SANITARY NOTES
ELECTRIC & TELECOMMUNICATIONS
GAS
FOR CLARITY PIPES MAY NOT BE DRAWN TO SCALE OR EXACTLY LOCATED.5.
THE INFORMATION ON THE DRAWINGS.
FIELD VERIFIED. NOTIFICATION SHALL BE GIVEN TO THE OWNER IF THE FIELD VERIFICATION DIFFERS FROM
IS IN THE VICINITY OF EXISTING PIPING, THE LOCATION AND ELEVATION OF THE EXISTING PIPING SHALL BE
WHEN CONNECTIONS ARE TO BE MADE TO EXISTING PIPING AND STRUCTURES OR WHERE CONSTRUCTION4.
BE CONTACTED BY THE CONTRACTOR.
BEFORE WORKING WITH OR AROUND EXISTING UTILITIES, THE APPROPRIATE UTILITY COMPANY SHALL3.
THE CONTRACTOR, AT HIS EXPENSE WITH THE PERMISSION OF THE OWNER.
CONSTRUCTION WITHOUT UNDUE INTERRUPTION OF SERVICE MAY BE REMOVED AND REPLACED BY
UNLESS OTHERWISE INDICATED ON THE DRAWINGS.  ANY PIPING WHICH CAN BE REMOVED DURING
LOCATE AND MAINTAIN IN SERVICE ALL EXISTING UTILITIES ENCOUNTERED DURING CONSTRUCTION
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE AND ORDER ALL NEW SERVICES,2.
SPECIFICATIONS AND DETAILS OF THE APPROPRIATE PUBLIC UTILITY COMPANY.
ALL UNDERGROUND UTILITIES MUST BE INSTALLED IN ACCORDANCE WITH THE STANDARDS,1.
FINAL CONNECTION LOCATION SUBJECT TO REVIEW AND APPROVAL BY EVERSOURCE.
NEW BUILDING BY A CONNECTION TO THE EXISTING TRANSFORMER ON THE WESTERLY PROPERTY LINE.
NEW ELECTRIC & TELECOMMUNICATIONS SERVICES SHALL BE PROVIDED TO THE UTILITY ROOM IN THE1.
CONNECTICUT NATURAL GAS.
NORTHWEST CORNER OF THE SITE. CONNECTION LOCATION AND SIZE TO BE REVIEWED AND APPROVED
THE NEW BUILDING SHALL BE SERVED BY A NEW GAS CONNECTION TO AN EXISTING STUB AT THE2.
THE CONTRACTOR PRIOR TO INSTALLING GAS SERVICES.
THE LOCATION, SIZE, AND DEPTH OF ALL CONNECTION POINTS SHALL BE VERIFIED IN THE FIELD BY1.
STUBS PER MAP REF. 2 (VIF)
EXISTING 6" FIRE & 4" DOMESTIC
EXISTING GAS VALVE (VIF)
8" CLDIP WATER MAIN
12" CLDIP WATER MAIN
TOWN OF SIMSBURY.
COMPANY OF CONNECTICUT RULES AND REGULATIONS DATED JULY 31, 2024, AS AMENDED AND THE
ALL MATERIALS AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE AQUARION WATER5.
(SDR 26) PIPE WITH GASKETED, COMPRESSION-TYPE JOINTS WITHIN 10 FEET OF THE  WATER LINE.
CONSTRUCTED OF WATER WORKS GRADE DUCTILE IRON PIPE WITH MECHANICAL JOINTS OR PVC
SANITARY SEWER LINES. IF 18 INCHES OF CLEARANCE IS NOT PROVIDED THEN THE SEWER MUST BE
A MINIMUM OF 18 INCHES OF VERTICAL CLEARANCE SHALL BE PROVIDED BETWEEN NEW WATER AND4.
ALL NEW WATER LINES SHALL HAVE A MINIMUM OF 54" OF COVER.3.
CONFORM TO CLASS 52 CONFORMING TO AWWA C151.
AT THE NORTHWEST CORNER OF THE SITE TO THE UTILITY ROOM IN THE NEW BUILDING. PIPE SHALL
A NEW 4"Ø CLDIP DOMESTIC WATER SERVICE SHALL BE INSTALLED FROM THE EXISTING SERVICES STUB3.
CONFORMING TO AWWA C151.
THE SITE TO THE SPRINKLER ROOM IN THE NEW BUILDING. PIPE SHALL CONFORM TO CLASS 52
SERVICE SHALL BE INSTALLED FROM THE EXISTING SERVICE STUB AT THE NORTHWEST CORNER OF
FIRE/SPRINKLER SERVICES FOR THE CAR WASH ARE NOT REQUIRED. IF REQUIRED THE NEW FIRE2.
THE CONTRACTOR PRIOR TO ORDERING, FURNISHING, OR INSTALLING WATER SERVICES.
THE LOCATION, SIZE, AND DEPTH OF ALL CONNECTION POINTS SHALL BE VERIFIED IN THE FIELD BY1.
FL (CALC) = 190.7± (VIF)
LATERAL PER MAP REF. 2.
EXISTING 6" PVC SANITARY SERVICE
SIZE TO BE CONFIRMED BY MEP
4" DOMESTIC WATER SERVICE
T
FL (CALC) = 191.2± (VIF)
STUB PER MAP REF. 2.
EXISTING 6" PVC SANITARY
6" FL = 196.5±
6" FL = 198.0±
6" FL = 198.0±
6" FL = 198.0±
6" FL = 198.0±
ELECTRIC & TELECOMM SERVICE
GAS SERVICE
@ 0.070 FT/FT
45 LF - 8"Ø PVC (SDR35)
@ 0.083 FT/FT
26 LF - 8"Ø PVC (SDR35)
FL(OUT) = 194.25
FL(IN) = 194.35
TF = 201.25
SMH #1
FL(OUT) = 197.00
FL(IN) = 197.10
TF = 201.45
SMH #2
FL(OUT) = 197.65
FL(IN) = 197.85
TF = 201.45
SMH #3
DESIGN BY OTHERS
WATER RECOVERY SYSTEM
ADAWF, MAX. DAILY, AND PEAK DEMAND TO BE CONFIRMED BY MEP.C.
CALCULATED ADAWF = 31,940 GPDB.
WASH FACILITY IN COLCHESTER, CT WITH GROWTH FACTOR = 1.36 AND FACTOR OF SAFETY = 1.50.
AVERAGE DAILY FLOW CALCULATED BASED ON METER FLOW READINGS FROM DIAMOND SPARKLE CARA.
SANITARY SEWER FLOW CALCULATIONS:5.
POLLUTION CONTROL AUTHORITY RULES AND REGULATIONS.
ALL MATERIALS AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE TOWN OF SIMSBURY WATER4.
THE DOWNSTREAM DIRECTION OF THE MAIN SHALL BE MADE.
SEWER MAIN IS REQUIRED, A SADDLE OR OTHER APPROVED CONNECTION METHOD AT AN ANGLE OF 45° IN
DIRECT CONNECTION TO THE EXISTING SEWER STUB SHALL BE MADE. IF DIRECT CONNECTION TO THE3.
PIPE SLOPE SHALL BE 2% AND THE MAXIMUM PIPE SLOPE SHALL BE 10%
CONFORM TO ASTM D2241 AND SHALL MEET THE DEFLECTION STANDARDS OF ASTM D3303. THE MINIMUM
AN EXISTING 6" STUB IN THE 8" PVC SEWER MAIN IN THE DRIVEWAY TO THE WEST. THE PIPE SHALL
THE NEW BUILDING WILL BE SERVED BY A 6"Ø PVC (SDR 35) SANITARY SEWER LATERAL CONNECTING TO2.
THE CONTRACTOR PRIOR TO ORDERING, FURNISHING, OR INSTALLING SEWER SERVICES.
THE LOCATION, SIZE, TYPE, AND DEPTH OF ALL CONNECTION POINTS SHALL BE VERIFIED IN THE FIELD BY1.
FL = 185.09 (8")
TF = 197.39
EX. SMH
FL = 184.11 (8")
TF = 196.63
EX. SMH
TF = 193.81
EX. SMH
REMOVED OR ABANDONED
WATER PIPE STUBS TO BE
EXISTING FIRE AND DOMESTIC
250' - 8" P
V
C
 @
 0.025

Page 18 · open in PDF

 
 
NOTES:
1. INSTALL PER MANUFACTURER
SPECIFICATIONS.
2. INSPECT PER EROSION CONTROL
NOTES OR AS DIRECTED.
3. REMOVE SEDIMENT WHEN BAG
IS HALF FULL AND DEPOSIT PER
EROSION CONTROL NOTES.
4. REPAIR OR REPLACE WITHIN 24
HOURS OF OBSERVED FAILURE.
S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
E
E
C
T
FLAG POLE
CONC. WALK
ANTI-TRACKING PAD DETAIL
SOIL STOCKPILE DETAIL
SECTIONELEVATION
SILT FENCE
INLET SEDIMENT
CONTROL DEVICE
TEMPORARY SEDIMENT TRAP (TST) SIZING
PLAN
TEMPORARY SEDIMENT TRAP
OUTLET SECTION
                            SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE:   1" =    20'
PROJECT NUMBER:
00222 - 001  
 20 0  20  40  60 
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION                       
SHEET
DATE
REVISED
 5/18/26
 6/26/26
OF   5 6   
REVISION SUMMARY
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
             DORSET CROSSING PAD            
           MASTER DEVELOPMENT PLAN          
                     PREPARED FOR                     
        DIAMOND SPARKLE CAR WASH LLC, APPLICANT       
    EROSION & SEDIMENTATION CONTROL PLAN    
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)        
38C
NRCS
38C
NRCS
38C
NRCS 34A
NRCS
34A
NRCS
34B
NRCS
198
200
200
198
200
200
200
202
201
201
201
202
201
DORSET          CROSSING          DRIVE
SEE PLAN FOR WIDTH
NOT TO SCALE
COMPACTED SUBGRADE
50'-0" MIN. LENGTH
ROAD
6" CTDOT 2" STONE
FOR LOW SOIL BEARING CAPACITY
USE MIRAFLEX 600X OR EQUAL
2 MAX
3
NOT  TO  SCALE
MATERIAL STOCKPILE
FLOW
(TYP.)
STOCKPILE (TYP.)
OF MATERIAL 
AROUND PERIMETER
SYSTEM PLACED
EROSION CONTROL 
NOT TO SCALE
FLOW
3'-0" M IN.
NOTES:
1.  INSTALL SILT FENCE & WOOD STAKES AS RECOMMENDED BY MANUFACTURER.
2. SILT FENCE SUBJECT TO HEAVY LOADS SHALL BE REINFORCED WITH FARM FENCING & STEEL 
POSTS (0.5 # STEEL/L.F.).  THE MINIMUM POST LENGTH SHALL BE 5'-0".
3. SILT FENCE FABRIC SHALL BE A PERVIOUS SHEET OF WOVEN PROPYLENE, NYLON, POLYESTER
OR POLYETHYLENE FILAMENTS AND SHALL BE CERTIFIED BY THE MANUFACTURER OR SUPPLIER.
2'-6" M
IN
.
12" M
IN
.
100°
10'-0" MAX.
 
6" M IN.
GRADE
FINISH
GRADE
FINISH
FENCE (SEE NOTE 2)
ATTACHED TO WIRE
SILT FENCE FABRIC
SELF-SUPPORTING
BACKFILL
RECOMPACTED 
GROUND
FABRIC BELOW
EXTEND 6" OF
(MIN. LENGTH: 3' - 6')
1" x 2" WOOD STAKE
NOT TO SCALE
DUMPING STRAPS
STORM GRATE CURB OPENING
SILT SACK
LIFT STRAPS
CURB FILTER
PORTS
OUTFLOW
OPTIONAL
CT DOT #3 STONE
GEOTEXTILE FABRIC
MODIFIED RIPRAP
HAYBALES
DIVERTED RUNOFF
OUTLET
NOT TO SCALE
W
L
VARIES2'
1' M IN.
5' M AX.
1.5
1
1
2
1
2
2
1
WEIR
SOIL BERM
TST AREA (AC) REQUIRED WET VOL. DRY VOL.
(ACRE) VOL. (CY) (CY) (CY)
1 1 134 67 67
18" DRY VOLUM E
18" W ET VOLUM E
Mixed Use Retail/Medical Office
Total 15,000 Square Feet
1 Story
BUILDING #2
FF = 201.50
CAR WASH
1 STORY
BUILDING #1
8" CLDIP WATER MAIN
T
250' - 8" P
V
C
 @
 0.025
GENERAL CONSTRUCTION NOTES
SEQUENCE OF CONSTRUCTION
E & S CONTROL NARRATIVE
EROSION & SEDIMENT CONTROL PLAN
E & S CONTROL NOTES
INSPECTION AND MAINTENANCE
SIMSBURY AND THE STATE OF CONNECTICUT.
THE CONTRACTOR SHALL CONFORM TO ALL REQUIREMENTS OF ALL LOCAL AGENCIES OF THE TOWN OF2.
TO BE PERFORMED.
THE CONTRACTOR IS REQUIRED TO OBTAIN ALL NECESSARY LOCAL AND STATE PERMITS FOR THE WORK1.
REMOVE E&S CONTROLS WHEN PERMANENT VEGETATIVE COVER IS ESTABLISHED.11. 
FINISH GRADE, SPREAD TOPSOIL, SEED, AND COMPLETE PLANTING.10.
INSTALL BITUMINOUS CONCRETE & CURBING.9. 
CONSTRUCT ACCESS DRIVES, PARKING AREAS & WALKS.8.
INSTALL UTILITIES AND STORM DRAINAGE.7.
INSTALL FOUNDATION & ERECT BUILDING.6.
EXCAVATE, PLACE FILL AND ROUGH GRADE SITE.5.
STRIP & STOCKPILE TOPSOIL. EXPORT EXCESS TOPSOIL AS REQUIRED.4.
ABANDON AND/OR REMOVE UTILITIES AS REQUIRED.3.
FOR FIELD CONDITIONS.
INSTALL EROSION CONTROL MEASURES AT THE LOCATIONS SHOWN ON THE PLANS OR AS REQUIRED2.
COORDINATE A MEETING WITH TOWN AND OWNER. RESPONSIBLE PARTIES TO BE IDENTIFIED.1.
CONSTRUCTION UNTIL DISTURBED AREAS ARE STABILIZED.
FEATURES, MINIMIZE SOIL DISTURBANCE, AND MAINTAIN E&S CONTROLS FOR THE DURATION OF
WITHIN THE DEVELOPMENT AREA. THE CONTRACTOR SHALL TAKE CARE TO PRESERVE SURROUNDING
THE TOPOGRAPHY CONSISTS OF GENTLY SLOPING TERRAIN, WITH SLOPES RANGING FROM 2% TO 5%2.
MEASURES SHALL BE EMPLOYED AS REQUIRED, SUCH AS COVERING STOCKPILES OR APPLYING WATER.
TO WIND-BLOWN EROSION. LONG-TERM EXPOSURE OF THESE SOILS SHALL BE AVOIDED.  DUST-CONTROL
MODERATE SUSCEPTIBILITY TO SHEET AND RILL EROSION AND A MODERATE TO HIGH SUSCEPTIBILITY
MERRIMAC FINE SANDY LOAM TO THE EAST. USDA IDENTIFIES THE SOILS AS HAVING A LOW TO
PER USDA NRCS SOIL MAPPING, THE SITE CONSISTS OF HINCKLEY LOAMY SAND TO THE WEST AND1.
CONCERNS & ISSUES SHALL BE NOTED:
DEPICTED ON THIS SHEET SHALL BE FOLLOWED.  IN ADDITION THE FOLLOWING SITE SPECIFIC E&S CONTROL
THE EROSION & SEDIMENTATION CONTROL NOTES, INSPECTION REQUIREMENTS, PLANS, AND DETAILS
ARE COMPLETED. 
STABILIZATION OF THE SITE WILL OCCUR IN SEQUENCE AS THE BUILDING AND SURROUNDING IMPROVEMENTS
SEDIMENTATION. PHASING OF MASS EARTH WORK IS NOT REASONABLE DUE TO THE LIMITED SIZE OF THE SITE.
MINIMIZES THE AREA, LIMIT AND TIME SOILS ARE EXPOSED TO RAIN AND WIND AND SUBJECT TO EROSION &
PART OF THE WORK, INCLUDING CONNECTION TO THE EXISTING PAVED DRIVEWAY TO THE WEST. THE PLAN
THE EXISTING PARCEL IS APPROXIMATELY 1.08 ACRE.  APPROXIMATELY 1.1 ACRES WILL BE DISTURBED AS
IMPROVEMENTS. THE GENERAL SCOPE OF WORK IS DESCRIBED ABOVE IN THE CONSTRUCTION SEQUENCE. 
THE PROPOSED PROJECT CONSISTS OF THE CONSTRUCTION OF A CAR WASH FACILITY AND ASSOCIATED SITE
AND SWALES SHALL BE MAINTAINED TO CONTROL RUNOFF AND PREVENT SEDIMENT DISCHARGE.
PUBLIC ROW AND INFILTRATION SHALL BE MAINTAINED. AT ALL TIMES DURING CONSTRUCTION, THE TST'S
DIRECTED TO THE TST'S. CONSTRUCTION WASTEWATERS SHALL NOT DISCHARGE DIRECTLY TO THE
DURING SITE CONSTRUCTION. ALL DEWATERING DISCHARGE AND CONSTRUCTION RUNOFF SHALL BE
TEMPORARY SILTATION TRAPS (TST) AND DIVERSION SWALES SHALL BE INSTALLED AS NECESSARY7.
DUST CONTROL MEASURES SHALL BE APPLIED THROUGHOUT THE CONSTRUCTION PERIOD. 6.
AN EROSION CONTROL SYSTEM SHALL BE INSTALLED AROUND ALL STOCKPILES OF SOIL.5.
BASINS ON SITE SHALL BE SURROUNDED WITH STRAW WADDLES OR BALES.  
SACKS AS SHOWN ON THE PLAN THROUGHOUT THE CONSTRUCTION PERIOD. IF REQUIRED, NEW CATCH
ALL CATCH BASINS WITHIN THE PROJECT AREA SHALL BE PROTECTED WITH INLET CONTROL FILTER SILT4.
TRAFFIC. THE SURROUNDING ROAD SURFACES SHALL BE SWEPT DAILY OR AS REQUIRED.
TO PREVENT THE TRANSPORT OF SEDIMENTS OFF THE CONSTRUCTION SITE BY TRUCKS AND EQUIPMENT
AN ANTI-TRACKING APRON WILL BE INSTALLED AT ALL ENTRANCES TO THE CONSTRUCTION SITE IN ORDER3.
CONSTRUCTION WHEREVER POSSIBLE.
ALL EROSION AND CONTROL MEASURES SHALL BE INSTALLED AT THE PROJECT SITE PRIOR TO2.
EMERGENCY CONTACT: TO BE PROVIDED PRIOR TO ISSUANCE OF BUILDING PERMIT
PARTY RESPONSIBLE FOR E&S CONTROL PLAN: DIAMOND SPARKLE CAR WASH, LLC1.
100 LBS. PER ACRE.
TEMPORARY GRASS SEEDING, IF NECESSARY, SHALL BE PERENNIAL RYE GRASS APPLIED AT A RATE OF11.
ACRE OR AS RECOMMENDED BY THE SEED MANUFACTURER.
GRASS SEED MIXTURES SHALL BE TALL FESCUE BLEND APPLIED AT A RATE NO LESS THAN 100LBS PER10.
SPRING: APRIL 15 TO JUNE 15, FALL: AUGUST 15 TO SEPTEMBER 15
THE FOLLOWING DATES FOR SEEDING SHALL BE USED:9.
AREAS OUTSIDE OF IMPERVIOUS AREAS TO RECEIVE A MINIMUM 4" OF TOPSOIL.8.
IN CTDOT FORM 819 OR AS DIRECTED BY THE LANDSCAPE ARCHITECT.
ALL DISTURBED AREAS ARE TO BE RAKED, SEEDED AND FERTILIZED PER "TURF ESTABLISHMENT" SPEC.7.
THESE PLANS OR AS DIRECTED BY THE ENGINEER OR TOWN.
THE CONTRACTOR WILL BE RESPONSIBLE FOR IMPLEMENTING ALL E&S CONTROL DEVICES AS SHOWN ON6.
IS CONSISTENT WITH THE INTENT OF THE PLAN.
SEDIMENT REMOVED FROM ANY CONTROL STRUCTURES SHALL BE DISPOSED OF IN A MANNER WHICH5.
DURING THE CONSTRUCTION PERIOD AS NECESSARY OR REQUIRED BY THE ENGINEER OR THE TOWN.
EROSION CONTROL DEVICES SHALL BE MAINTAINED, REPLACED AND/OR ADDED BY THE CONTRACTOR4.
DATED 2023, AS AMENDED AND THE TOWN OF SIMSBURY REGULATIONS.
SPECIFICATIONS OF THE "CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL",
ALL E&S CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE STANDARDS AND3.
E&S CONTROL MEASURES SHALL BE INSTALLED PER THE PLANS, OR AS DIRECTED BY THE TOWN.2.
CONSTRUCTION IS ANTICIPATED TO START IN FALL 2026 AND BE COMPLETED IN 2027.1.
ALL STORMWATER STRUCTURES SHALL BE CLEANED AFTER REMOVAL OF E&S CONTROLS.6.
 THE HEIGHT (MAX.)2 1STRAW BALES - REMOVE COLLECTED SEDIMENT @ iv.
SILT SACKS - CLEAN PER MANUFACTURER'S RECOMMENDATIONSiii.
 THE HEIGHT (MAX.)2 1SILT FENCE - REMOVE COLLECTED SEDIMENT @ ii.
ANTI-TRACKING APRON - REPLENISH OR REPLACE STONE SA REQUIREDi.
TEMPORARY CONTROLS SHALL BE INSPECTED WEEKLY AND CLEANED:B.
INSPECT ROAD DAILY AND SWEEP/REMOVE TRACKED MATERIALS AS REQUIREDA.
ROUTINE INSPECTION AND MAINTENANCE SCHEDULE:5.
 CAPACITY2 1DEWATERING BASINS - REMOVE COLLECTED SEDIMENT @ C.
 DEPTH4 1SWALES - REMOVE COLLECTED SEDIMENT @ B.
 DEPTH OF SUMP2 1CATCH BASINS - REMOVE COLLECTED SEDIMENT @ A.
GREATER THAN 0.1 INCHES AND CLEANED AS FOLLOWS:
ALL STORMWATER STRUCTURES SHALL BE INSPECTED WITHIN 24 HOURS AFTER RAINFALL EVENTS4.
AFTER RAINFALL EVENTS GREATER THAN 0.1 INCHES
ALL E&S CONTROLS SHALL BE INSPECTED, REPAIRED, AND CLEANED IF NECESSARY WITHIN 24 HOURS3.
CLEANED TO ENSURE THEY ARE IN PROPER WORKING ORDER.
CONDITIONS OR EFFECTS, ALL E&S CONTROLS SHALL BE INSPECTED, MAINTAINED, REPAIRED AND/OR
PRIOR TO A MAJOR STORM IN WHICH THE NOAA ISSUES WARNINGS OF FLOODING, SEVERE WEATHER2.
THE RESPONSIBLE PARTY SHALL PERFORM ROUTINE INSPECTIONS BASED ON THE FOLLOWING.1.
THE SITE IS STABILIZED.
RESPONSIBLE PARTY SHALL IMPLEMENT THE FOLLOWING THROUGHOUT THE CONSTRUCTION PERIOD UNTIL
REGULAR INSPECTION AND MAINTENANCE IS CRITICAL FOR THE EFFECTIVENESS OF E&S CONTROLS. THE
SWEPT AS REQUIRED
ROADWAY TO BE
APRON
ANTI-TRACKING
WET VOLUME = 67 CY
DRY VOLUME = 67 CY
TST #1
STOCKPILE
TOPSOIL
AROUND ALL BASINS (TYP.)
DEVICE TO BE INSTALLED
INLET SEDIMENT CONTROL
BOUNDARIES OR AS SHOWN (TYP.)
NORTH, EAST & SOUTH PROPERTY
SILT FENCE TO BE INSTALLED ALONG
DIVERSION SWALE TO WEST
WALL OF EX. CATCH BASIN
DISCHARGE INTO ORIFICE IN NORTH
STONE & RIPRAP WEIR FROM TST TO

Page 19 · open in PDF

S
WG
WG
WG
GG
GG
GG
WG
WG
S
WG
WG
WG
M
S
WG
S
S
GG
S
?
2622
CL&P
2623
CL&P
2623S
CL&P
ELEV.=198.71
E 989669.19
N 891545.09
P.K. NAIL
CP#19068
D
D
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
D
D
E
E
C
C
T
FLAG POLE
ELEV.=204.26
E 989309.93
N 891321.88
REBAR
CP#173
D
CONC. WALK
SET
MON.'S
SET
MON.
SET
MON.
SET
MON.
SET
MON.
SET
MON.
connection (typ.)
access/roadway 
Possible future 
connection (typ.)
access/roadway 
Possible future  
Mixed Use Retail/Medical Office
Total 15,000 Square Feet 1 Story
BUILDING #2
13A
Signal
Traffic
NOTES:
LIGHT POLE & BASE
                            SIMSBURY, CT
PROFESSIONAL SEAL
CONTACT INFORMATION
LEBANON, CONN 06249
191 NORWICH AVENUE
YANTIC RIVER CONSULTANTS, LLC
www.yanticriverconsultants.comWeb:
yanticriver@gmail.comEmail:
(860) 367-7264Phone:
SCALE:   1" =    20'
PROJECT NUMBER:
00222 - 001  
 20 0  20  40  60 
DATE DESCRIPTION
6/26/26 MASTER PLAN SUBMISSION                       
SHEET
DATE
REVISED
 5/15/26
 6/26/26
OF   6 6   
REVISION SUMMARY
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
             DORSET CROSSING PAD            
           MASTER DEVELOPMENT PLAN          
                     PREPARED FOR                     
        DIAMOND SPARKLE CAR WASH LLC, APPLICANT       
                LIGHTING PLAN               
10 DORSET CROSSING DRIVE (M/B/L I04/403/13C-F)        
LP
L
P
L
P
LP
LP
L
P
L
P
LP
LP
LP
LP
LP
DORSET          CROSSING          DRIVE
H
O
P
M
E
A
D
O
W
 S
T
R
E
E
T
 (C
T
 R
O
U
T
E
 10 &
 202)
NOT TO SCALE
1.  CLASS "F" CONCRETE CTDOT 816
2. REINFORCEMENT NOT SHOWN FOR
CLARITY. GRADE 60.
3. ANCHOR BOLTS HOT DIPPED GALVANIZED.
DIAMETER, PROJECTION EMBEDMENT, 
    LOCATION PER LIGHT POLE MANUAL.
4. EXTERIOR LAMP, BASE & POST SHALL BE
COORDINATED WITH TOWN, OWNER, &
ELECTRICAL CONTRACTOR
CONDUIT
2" DIA. PVC
GRADE
FINISH
1" CHAMFER
(TYP. OF 2)
2" DIA. PVC SWEEP
GROUND ROD
1" DIA. PVC FOR
(SEE NOTE 3)
ANCHOR BOLT
MANUFACTURER
PER LIGHT POLE
BOLT  PATTERN AS
24" DIA.
24" Ø
6"42"
DISTRIBUTION AS SPECIFIED
LIGHT FIXTURE OR EQUAL
LUMARK 'PRV-C15-D-UNV'
COOPER LIGHTING SOLUTIONS
15' M
O
U
N
T
IN
G
 H
E
IG
H
T
 A
B
O
V
E
 B
A
S
E
LIGHTING STATEMENT
LIGHTING NOTES
LUMINAIRE SCHEDULE
ARRANGEMENTDESCRIPTIONLABELQUANTITYSYMBOL
DOUBLEPRV-C15-730-D-UNV-T4-SA-BKT4A0
SINGLEPRV-C15-730-D-UNV-T4-SA-BK-HSST4HSS12
SINGLEPRV-C15-730-D-UNV-T4-SA-BKT40
T4HSS
T4HSS
T4HSS
T4HSS
T4HSS
T4HSS
T4HSS
0.1 fc
0.1 fc
0.1 fc
0.1 fc
0.1 fc
0.1 fc
0.2 fc
0.2 fc
0.2 fc
0.2 fc
0.2 fc
0.5 fc
0.5 fc
0.5 fc
0.5 fc
0.5 fc
1.0 fc
1.0 fc
1.0 fc
1.0 fc
1.0 fc
2.0 fc
2.0 fc
2.0 fc
2.0 fc
E
X
IS
T
IN
G
 D
R
IV
E
W
A
Y
AREA = 7,275 SF±
CAR WASH
1 STORY
BUILDING #1
CANOPY
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT INCLUDED IN PHOTOMETRIC PLAN
EXISTING LIGHT FIXTURE NOT
ISOLINE CONTOUR (TYP.)
ISOLINE VALUE (TYP.)
T4HSS
T4HSS
T4HSS
T4HSS
T4HSS
0.2 fc
T4HSS
INTERNAL SITE LIGHTING AT COMMON LOT LINES IS IN HARMONY WITH THE APPROVED PAD DEVELOPMENT.
A MAXIMUM ILLUMINATION VALUE OF 0.5 FC HAS BEEN MET AT THE DORSET CROSSING ROW (SOUTH).2.
PROPERTY LINES HAVE NOT BEEN CONSIDERED IN THE ANALYSIS.
BUILDING MOUNTED LIGHTING OR EXISTING POLE MOUNTED FIXTURES ALONG THE NORTH, WEST, AND SOUTH
OF 0.5 TO 2.0 FC FOR DRIVES, PARKING AREAS AND PEDESTRIAN WALKS SERVING THE BUILDING ENTRANCES.
SOCIETY. MINIMUM HORIZONTAL ILLUMINATION LEVELS OF 0.2 FC ARE PROPOSED WITH A TYPICAL RANGE
DEVELOPMENT AND GENERALLY MEETS THE RECOMMENDATIONS OF THE ILLUMINATING ENGINEERING
EXTERIOR LIGHTING HAS BEEN DESIGNED FOR A SUBURBAN COMMERCIAL USE WITHIN AN APPROVED PAD1.
PHOTOMETRIC PLAN.
CANOPY LIGHTS WILL BE DARKSKY APPROVED OR MOUNTED IN THE CEILING. NOT INCLUDED IN
SEE ARCHITECTURAL PLANS FOR BUILDING AND CANOPY MOUNTED LIGHTING. ALL BUILDING AND4.
LEVELS SET TO 25% OF DESIGN VALUES.
LIGHTING WITHIN 15 MINUTES OF NO ACTIVITY SHALL HAVE REDUCED POWER OUTPUT AND ILLUMINATION
SECURITY AND SAFE VEHICULAR CIRCULATION THROUGH THE SITE FOR USE OF THE SELF-SERVE BAYS.
TIMERS, PHOTOCELLS, OR MOTION SENSORS TO REDUCE LIGHTING TO THE MINIMUM NECESSARY FOR
ARE CLOSED, ALL NON-ESSENTIAL LIGHTING FIXTURES SHALL BE CONTROLLED MANUALLY OR WITH
THE SELF-SERVE BAYS ARE OPEN 24 HOURS. WHEN THE AUTOMATIC TUNNEL AND TOUCHLESS BAYS3.
POLE-MOUNTED = 15' FIXTURE HEIGHTA.
FIXTURE MOUNTING HEIGHTS:2.
THAN 10° OF TILT.
PREVAIL LED IS DARKSKY APPROVED FOR 3000K CCT AND WARMER, WITH MOUNTING OPTIONS LESS
OF LIGHT AND GLARE ON ADJACENT PROPERTIES AND ROADWAYS. THE SELECTED FIXTURE LUMARK
ALL SITE LIGHTING SHALL BE FULL CUT-OFF OF SHIELDED TYPE TO PREVENT UPWARD DISTRIBUTION1.

Page 20 · open in PDF

Page 21 · open in PDF

Page 22 · open in PDF

Site Plant Schedule; 100% Native By Variety: 100% Native By Amount: 
Key Quantity Botanical Name  Common Name  Size Installed Comments 
Street / Shade / Ornamental Trees: 
Aag # 1  Acer rubrum ‘Armstrong Gold’   Armstrong Gold Maple 2” – 2-1/2" Cal., 10’ O.C. B & B (N) 
Arr # 2  Acer rubrum ‘Redpointe’    Redpointe Maple 2” – 2-1/2" Cal., 30’ O.C. B & B (N) 
Axa # 1  Acer x freemani ‘Armstrong’  Armstrong Freeman Maple  2” – 2-1/2" Cal., 15’ O.C. B & B (N) 
Alu # 2  Amelanchier laevis ‘Lustre’  Lustre Alleg. Serviceberry  2” – 2-1/2" Cal., 15’ O.C. B & B (N) 
Coc # 2  Celtis occidentalis  Hackberry  2” – 2-1/2" Cal., 40’ O.C. B & B (N) 
Cbh # 1  Cercis canadensis ‘Burgundy Hearts’ Burgundy Hearts Eastern Redbud 2” – 2-1/2" Cal., 25’ O.C. B & B (N)
Lss # 2  Liquidamber sty.‘Slender Silhouette’ Slender Silhouette Sweetgum  2” – 2-1/2" Cal., 6’ O.C. B & B (N) 
Lha # 1  Liquidamber styraciflua ‘Hapdell’ Hapdell Sweetgum  2” – 2-1/2" Cal., 30’ O.C. B & B (N) 
Nwf # 1  Nyssa sylvatica ‘Wildfire’  Wildfire Black Tupelo 2” – 2-1/2" Cal., 25’ O.C. B & B (N) 
Qpb # 2  Quercus pal. ‘Pacific Brilliance’ Pacific Brilliance Pin Oak  2” – 2-1/2" Cal., 25’ O.C. B & B (N)  
Qco # 2    Quercus coccinea  Scarlet Oak  2” – 2-1/2" Cal., 45’ O.C. B & B (N) 
Uap # 1  Ulmus americana ‘Princeton’  American Elm  2” – 2-1/2” Cal., 40’ O.C. B & B (N) 
Evergreen Trees:
Ish # 1  Ilex opaca ‘Satyr Hill’  Satyr Hill Holly 6’ – 7’ Ht., 13’ O.C.  B & B (N-E) 
Shrubs / Ornamental Grasses:
Ape # 8  Azalea periclymenoides Pinxterbloom Azalea  3 Gal., 4.5' O.C. Container (N) 
Bba # 19  Bouteloua gra. ‘Blonde Ambition’ Blonde Ambition Gramma  1 Gal., 2.75’ O.C.  Container (N) 
Cla # 9  Chasmanthium latifolium  Northern Sea Oats  1 Gal., 2’ O.C.  Container (N) 
Cse # 2  Cornus sericea ‘Arctic Fire’   Arctic Fire Dogwood  3 Gal, 4' O.C.  Container (N) 
Gba # 13  Gaylussacia baccata  Black Huckleberry  2 Gal., 2.5’’ O.C.  Container (N) 
Igd # 4  Ilex glabra ‘Densa’   Dense Inkberry Holly  3 Gal., 6’ O.C.  Container (N-E) 
Jgc # 5  Juniperus communis ‘Gold Cone’  Gold Cone Juniper  3 Gal., 2.75' O.C Container (N-E) 
Jhg # 5  Juniperus horizon. ‘Golden Carpet‘ Golden Carpet Juniper 2 Gal., 3.5' O.C. Container (N-E) 
Jyt # 4  Juniperus hor. ‘P.C. Youngstown’ Youngstown Juniper  2 Gal., 5' O.C.  Container (N-E) 
Kau # 15  Kalmia augustfolia  Sheep Laurel  2 Gal., 4' O.C.  Container (N-E) 
Knh # 4  Kalmia latifolia ‘Nathan Hale’ Nathan Hale Mountain Laurel 5 Gal.., 7' O.C. Container (N-E) 
Knm # 6  Kalmia latifolia ‘Nipmuck’  Nipmuck Mountain Laurel  3 Gal.., 4' O.C. Container (N-E) 
Klk # 7  Kalmia latifolia ‘Keepsake’  Keepsake Mt. Laurel  3 Gal.., 5' O.C. Container (N-E) 
Las # 14  Leucothoe axillaris ‘Squirt’  Squirt Coast Leucothoe 2 Gal., 2.5' O.C. Container (N-E) 
Lfr # 9  Leucothoe fontanesiana ‘Rainbow’ Rainbow Leucothoe  3 Gal., 4' O.C.  Container (N-E) 
Mca # 12  Muhlenbergia capillaris Muhly Grass   1 Gal., 3’ O.C.  Container (N-E) 

Page 23 · open in PDF

Page 24 · open in PDF

Page 25 · open in PDF

Page 26 · open in PDF

Page 27 · open in PDF

Page 28 · open in PDF

Page 29 · open in PDF

Page 30 · open in PDF

Page 31 · open in PDF

Page 32 · open in PDF

Page 33 · open in PDF

Page 34 · open in PDF

Page 35 · open in PDF

Page 36 · open in PDF

Page 37 · open in PDF

Page 38 · open in PDF

Page 39 · open in PDF

Page 40 · open in PDF

Page 41 · open in PDF

Page 42 · open in PDF

Page 43 · open in PDF

Page 44 · open in PDF

Page 45 · open in PDF

Page 46 · open in PDF

Page 47 · open in PDF

Page 48 · open in PDF

Page 49 · open in PDF

Page 50 · open in PDF

Page 51 · open in PDF

Page 52 · open in PDF

Page 53 · open in PDF

Page 54 · open in PDF

Page 55 · open in PDF

Page 56 · open in PDF

Page 57 · open in PDF

Page 58 · open in PDF

Page 59 · open in PDF

Page 60 · open in PDF

Page 61 · open in PDF

Page 62 · open in PDF

Page 63 · open in PDF

Page 64 · open in PDF

Page 65 · open in PDF

Page 66 · open in PDF

Page 67 · open in PDF

Page 68 · open in PDF

Page 69 · open in PDF

Page 70 · open in PDF

Page 71 · open in PDF

Page 72 · open in PDF

Page 73 · open in PDF

Page 74 · open in PDF

Page 75 · open in PDF

Page 76 · open in PDF

Page 77 · open in PDF

Page 78 · open in PDF

  

Minutes: archived copy, SHA-256 67b7cf724dc0…. Agenda: archived copy, SHA-256 e1340b8d3150…. Packet: archived copy, SHA-256 a08286c1b55f….