Towns / Simsbury / Conservation Commission/Inland Wetlands and Watercourses Agency / Nov 17, 2026
Conservation Commission/Inland Wetlands and Watercourses Agency, Nov 17, 2026
Simsbury Conservation Commission/Inland Wetlands and Watercourses Agency Hide agendas that already have minutesDocuments
| Type | Document | Pages | Open |
|---|---|---|---|
| agendaagenda | Conservation Commission/Inland Wetlands and Watercourses Agency Meeting | 1 | PDF download · town site |
| packetpacket | Conservation Commission/Inland Wetlands and Watercourses Agency Meeting (packet) | 31 | PDF download · town site |
Summary of the agenda
AI-generated summary. Each line links to the PDF page it came from; check it before relying on it. An agenda lists what the board planned to take up; it does not record decisions.
Read the official agenda (PDF, 1 page) The PDF is the record; this summary is a guide to it.
This is the agenda for the November 17, 2026 meeting of the Conservation Commission/Inland Wetlands and Watercourses Agency. It lists applications for 0 Lark Rd, 3 Clover Lane, and three designated agent administrative approvals, but.
On the agenda (5)
- CC 26-06 - 0 Lark Rd (Vacant Parcel), application and plans · p. 1
- CC 26-25 - 3 Clover Lane, revised application dated 10-23-26 · p. 1
- Designated Agent Administrative Approval - CC 26-23, 7 Orchard Lane (agent approval letter) · p. 1
- Designated Agent Administrative Approval - CC 26-24, 111 West Street (agent approval letter) · p. 1
- Designated Agent Administrative Approval - CC 26-26, 4 Washburn Dr (agent approval letter) · p. 1
Full text of the documents
View the agenda PDF on this page (Conservation Commission/Inland Wetlands and Watercourses Agency Meeting)
Text of the agenda (Conservation Commission/Inland Wetlands and Watercourses Agency Meeting, 1 page)
Page 1 · open in PDF
Conservation Commission/Inland Wetlands And Watercourses Agency Agenda 11-17-26 AGENDA.PDF CC 26-06 0 Lark Rd (Vacant Parcel) CC 26-06 LARK ROAD APPLICATION AND NARRATIVE - REDACTED VERSION.PDF CC 26-06 LARK ROAD PLANS.PDF CC 26-25 3 Clover Lane CC 26-25 3 CLOVER LANE REVISED APPLICATION 10-23-26 - REDACTED.PDF Designated Agent Administrative Approvals CC 26-23 7 ORCHARD LANE AGENT APPROVAL LETTER.PDF CC 26-24 111 WEST STREET AGENT APPROVAL LETTER.PDF CC 26-26 4 WASHBURN DR AGENT APPROVAL LETTER.PDF 1. 7:00 P.M. Documents: 2. 7:00 P.M. Documents: 3. 7:00 P.M. Documents: 4. Documents:
View the packet PDF on this page (Conservation Commission/Inland Wetlands and Watercourses Agency Meeting (packet))
Text of the packet (Conservation Commission/Inland Wetlands and Watercourses Agency Meeting (packet), 31 pages)
Page 1 · open in PDF
Conservation Commission/Inland Wetlands And Watercourses Agency Agenda 11-17-26 AGENDA.PDF CC 26-06 0 Lark Rd (Vacant Parcel) CC 26-06 LARK ROAD APPLICATION AND NARRATIVE - REDACTED VERSION.PDF CC 26-06 LARK ROAD PLANS.PDF CC 26-25 3 Clover Lane CC 26-25 3 CLOVER LANE REVISED APPLICATION 10-23-26 - REDACTED.PDF Designated Agent Administrative Approvals CC 26-23 7 ORCHARD LANE AGENT APPROVAL LETTER.PDF CC 26-24 111 WEST STREET AGENT APPROVAL LETTER.PDF CC 26-26 4 WASHBURN DR AGENT APPROVAL LETTER.PDF 1. 7:00 P.M. Documents: 2. 7:00 P.M. Documents: 3. 7:00 P.M. Documents: 4. Documents:
Page 2 · open in PDF
Page 1 of 2 Conservation Commission/Inland Wetlands and Watercourses Agency Regular Meeting November 17, 2026, at 7:00 PM Town Hall-BOE Conference Room 933 Hopmeadow Street, Simsbury, CT, 06070 AGENDA I. CALL TO ORDER & SEATING OF ALTERNATES II. APPROVAL OF MINUTES October 20, 2026 III. IWWA APPLICATION(S) FOR RECEIPT AND DETERMINATION OF SIGNIFICANCE • Application CC #26-06 of Timothy Martin, Applicant and Owner, for a wetlands permit to construct 24 multi-family units in two structures within the upland review area on the undeveloped 2.86 acre lot at the end of Lark Road, sometimes referred to as 0 Lark Road (Assessor’s Map D03, Block 208, Lot 003A) Simsbury, CT 06070, R-40. The project is proposed under Section 8-30g of the State Statutes, the Affordable Housing Appeals Act. • Application CC #26-25 of James Allen, Applicant, for a wetlands permit to construct a ± 1250 sq.ft. patio within the upland review area at 3 Clover Lane (Assessor’s Map E15, Block 120, Lot 013) Weatogue, CT 06089, R-40. IV. IWWA APPLICATION(S) FOR PUBLIC HEARING OR ACTION • None V. CONSERVATION COMMISSION AND OTHER IWWA BUSINESS • Election of Officers
Page 3 · open in PDF
Page 2 of 2 • Discussion regarding amending Conservation Commission/Inland Wetlands and Watercourses Agency By-laws/Rules of Procedure to add “Public Audience” to Agendas for regular and special meetings, pursuant to the adopted Town Charter Review amendments. VI. DESIGNATED AGENT ACTIONS AND OTHER REPORTS • Application CC #26-23 of Alexander and Shannon Stangle, Applicant, for a wetlands permit to remove trees and stumps within the upland review area at 7 Orchard Lane (Assessor’s Map D16, Block 419, Lot 046) Simsbury, CT 06070, R-40. • Application CC #26-24 of Dung Q. Tran, Applicant, for a wetlands permit to replace an existing concrete 1576 sq.ft. patio with stone and pavers and associated access walk in the upland review area at 111 West Street (Assessor’s Map F11, Block 103, Lot 013) Simsbury, CT 06070, B-2. • Application CC #26-26 of Tim Glover, Applicant, for a wetlands permit to construct a 20’ x 25’, two story addition in the upland review area, approximately 65’ from the wetland soils at 4 Washburn Drive (Assessor’s Map F09, Block 147, Lot 004) Simsbury, CT 06070, R-40. VII. ADJOURNMENT
Page 4 · open in PDF
Page 5 · open in PDF
Page 6 · open in PDF
Page 7 · open in PDF
Page 8 · open in PDF
Page 9 · open in PDF
Page 10 · open in PDF
Page 11 · open in PDF
LARK ROAD
SITE CIVIL PLANS FOR
NOVEMBER 2025
LARK ROAD, SIMSBURY, HARTFORD COUNTY,
CONNECTICUT
NO CERTIFICATE OF OCCUPANCY WILL BE ISSUED UNTIL ALL SITE IMPROVEMENTS
HAVE BEEN MADE.
ALL CONCRETE TO HAVE POLYPROPYLENE FIBER MESH UNLESS SPECIFIED
OTHERWISE BY SITE ENGINEER. 1 1/2 LB. FIBER MESH PER CUBIC
YARD OF CONCRETE.
ADD BACK FLOW PREVENTIVE TO WATER METER. BACK FLOW PREVENTIVE TO BE
WATTS 007 SERIES DOUBLE CHECK OR EQUAL.
CONTRACTOR TO CONTACT LOCAL UTILITY AUTHORITIES PRIOR TO ANY
EXCAVATION.
EXACT LOCATION OF ALL UTILITY TIE-INS TO BE CHOSEN BY APPROPRIATE
AUTHORITIES.
GENERAL NOTES:
1. NOTIFY CITY OF SIMSBURY INSPECTOR 24 HOURS BEFORE BEGINNING
EACH PHASE OF CONSTRUCTION.
2. EROSION CONTROL MEASURE TO BE INSTALLED & MAINTAINED PRIOR TO ANY
CONSTRUCTION ON SITE AND MAINTAIN UNTIL PERMANENT GROUND
COVER IS ESTABLISHED.
3. ALL DISTURBED AREAS WITHOUT PAVEMENT THAT ARE DISTURBED ARE TO BE
COVERED WITH MULCH OR SEED WITHIN 14 DAYS OF LAST DISTURBANCE.
4. ALL WORK SHALL COMPLY WITH APPLICABLE STATE, FEDERAL &
LOCAL CODES AND ALL NECESSARY LICENSES AND PERMITS SHALL
BE OBTAINED BY THE CONTRACTOR AT HIS EXPENSE UNLESS
PREVIOUSLY OBTAINED BY THE OWNER.
5. ALL WORK SHALL BE PERFORMED IN A FINISHED AND WORKMANLIKE
MANNER TO THE ENTIRE SATISFACTION OF THE OWNER, AND IN
ACCORDANCE WITH THE BEST RECOGNIZED TRADE PRACTICES.
6. DEVIATIONS FROM THESE PLANS AND SPECIFICATIONS WITHOUT THE
PRIOR CONSENT OF THE ENGINEER OR OWNER MAYBE CAUSE FOR THE
WORK TO BE UNACCEPTABLE TO THE OWNER.
7. THE UTILITIES SHOWN ARE SHOWN FOR THE CONTRACTOR'S
CONVENIENCE ONLY. THERE MAY BE OTHER UTILITIES NOT
SHOWN ON THESE PLANS. THE ENGINEER ASSUMES NO
RESPONSIBILITY FOR THE LOCATIONS SHOWN AND IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATIONS OF ALL
UTILITIES WITHIN THE LIMITS OF THE WORK. ALL DAMAGE MADE TO
EXISTING UTILITIES BY THE CONTRACTOR'S SHALL BE THE SOLE
RESPONSIBILITY OF THE CONTRACTOR.
8. ALL MATERIALS SHALL BE NEW.
9. ALL WORK PERFORMED ON CITY, COUNTY AND/OR STATE HIGHWAYS
SHALL BE IN STRICT CONFORMANCE WITH APPLICABLE DEPT OF
TRANSPORTATION STANDARDS AND SPECIFICATIONS.
10. UNLESS INDICATED OTHERWISE ON THE PLAN THE CONTRACTOR SHALL
REMOVE AND DISPOSE OF ALL EXISTING IMPROVEMENTS AND TREES,
WITHIN THE LIMITS OF THE WORK, FROM THE SITE. ON SITE.
BURIAL OF TREES AND OTHER DEBRIS WILL NOT BE TOLERATED.
11. THE CONTRACTOR SHALL PROVIDE CLEAN, SUITABLE EARTH FOR
REQUIRED FILL.
12. ALL FILL SHALL BE FREE OF ORGANIC OR OTHER DELETERIOUS
MATERIAL AND PLACED TO 95% OF THE MAXIMUM STANDARD PROCTOR
DENSITY (ASTM-698-70) UNLESS OTHERWISE INDICATED ON THE
PLANS. THE FILL SHALL BE PLACED IN LIFTS NOT TO EXCEED SIX
(6) INCHES OF COMPACTED FILL THICKNESS.
13. THE CONTRACTOR SHALL FURNISH AND MAINTAIN ALL NECESSARY
BARRICADES AROUND THE WORK AND SHALL PROVIDE PROTECTION
AGAINST WATER DAMAGE AND SOIL EROSION.
14. ACREAGE OF THE UNIT OR SITE: 1.148 ACRES.
15. ALL CONSTRUCTION MUST CONFORM THE GOVERNING AGENCY
STANDARDS AND SPECIFICATIONS.
16. ALL SILT BARRIERS MUST BE PLACED AS ACCESS IS OBTAINED
DURING CLEARING. NO GRADING SHALL BE DONE UNTIL SILT
BARRIER INSTALLATION ARE CONSTRUCTED.
17. SILT BARRIERS TO BE PLACED AS SHOWN AND/OR AS DIRECTED BY
PROJECT ENGINEER AND/OR GOVERNING AGENCY INSPECTOR. NOTIFY
INSPECTOR 24 HOURS PRIOR TO CONSTRUCTION.
18. "AS BUILT" OF ROADWAYS, STORM DRAINS, SEWERS AND WATER
REQUIRED PRIOR TO ACCEPTANCE. IF REQUIRED BY COUNTY OR
DEVELOPER.
19. THIS PROJECT TO BE SERVED BY PUBLIC GRAVITY SEWER.
ALL SEWERS MUST BE GRAVITY FED UNLESS SPECIFICALLY
APPROVED BY CITY OF SIMSBURY AND SO NOTED ON THE PLANS.
20. WATER SERVICE TO BE PROVIDED BY CITY OF SIMSBURY WATER AND
SEWER DEPARTMENT.
21. ADDITIONAL EROSION CONTROL DEVICES TO BE USED AS REQUIRED
BY GOVERNING AGENCY.
22. BERMUDA SOD TO BE ROLLED AND APPLY SAND AS REQUIRED TO LEVEL.
23. ALL UNPAVED AREAS MUST BE TEMPORARILY SEEDED WITH RYE, WHEAT AND
WEEPING LOVE GRASS AND MULCHED WITH PINE STRAW AT I BALE
SQUARE FEET AS SOON AS CONSTRUCTION PHASES PERMIT.
24. TEMPORARY SEEDLINGS DO NOT RELIEVE THE CONTRACTOR'S
RESPONSIBILITY OF PLANTING BERMUDA SOD.
25. IF REQUIRED, NO CERTIFICATE OF OCCUPANCY WILL BE ISSUED PRIOR TO THE
SUBMITTAL, REVIEW, AND APPROVAL OF A FINAL PLANT TO SUBDIVIDED THE PROPERTY.
26. CONCRETE CURB & GUTTER TO BE 2,500 PSI AT 28 DAYS.
27. CONTRACTOR SHALL PROVIDE & MAINTAIN OF STREET PARKING ON
THE PROPERTY DURING THE ENTIRE CONSTRUCTION PERIOD.
28. CONTRACTOR SHALL PROVIDE & MAINTAIN OFF STREET PARKING ON
THE PROPERTY DURING THE ENTIRE CONSTRUCTION PERIOD.
29. BASED ON THE INFORMATION SHOWN ON THE NATIONAL FLOOD INSURANCE
PROGRAM
30. ALL EROSION AND SEDIMENTATION CONTROLS, AND TREE PROTECTION MEASURES SHALL
BE INSTALLED PRIOR TO GRADING.
31. SIGNING AND STRIPING TO BE PROVIDED BY THE DEVELOPER ACCORDING TO
CITY OF SIMSBURY SPECIFICATIONS.
32. BORING OF ROAD MAY BE REQUIRED FOR WATER AND/OR SEWER CONNECTIONS.
DEVELOPMENT SERVICES PERMITTING DISCLAIMER:
THE APPROVAL OF THE THESE PLANS AND THE ISSUANCE OF THIS LAND DISTURBANCE
PERMIT DOES NOT IN ANY WAY SUGGEST THAT ALL OTHER REQUIREMENTS FOR
THE LEGAL OR APPROPRIATE OPERATIONS FOR THIS ACTIVITY, WHICH MAY REQUIRE
ADDITIONAL PERMITTING, HAVE BEEN MET. THE ONUS IS ON THE OWNER/DEVELOPER/BUILDER
TO DISCOVER WHAT ADDITIONAL PERMITTING OR APPROVALS NAY BE NECESSARY TO
OPERATE FROM THIS POINT IN AN APPROPRIATE AND LEGAL MANNER. PLAN APPROVAL
OR PERMIT ISSUANCE DOES NOT ABSOLVE THE APPLICANT FROM COMPLYING WITH ALL
APPLICABLE LAWS, POLICIES, STANDARDS OR OTHER PERMITS WHICH MAY BE REQUIRED
FOR THIS PROJECT.
1. Maximum side slopes are 2:1 All finished grading
shall be done as to provide position drainage
and eliminate trapped water in low areas.
2. Contractor shall verify all existing topographic
feature and conditions prior to the start of
construction, and shall notify the engineer
immediately of any discrepancies.
3. Any relocation and/or removal of existing water
& sewer utilities shall be approved by and coordinated with
CITY OF SIMSBURY.
4. All connections to existing utilities and all utility
installations shall be in compliance with
CITY OF SIMSBURY requirements.
5. If any conflicts or discrepancies are found on the
construction documents or in the field, the Contractor
must notify the Engineer immediately, and not commence
operations until the conflicts or discrepancies have
been resolved
GENERAL NOTES:
GENERAL NOTES:
NECESSARY BARRICADES, SUFFICIENT LIGHTS AND OTHER TRAFFIC CONTROL
METHODS AS MAY BE NECESSARY FOR THE PROTECTION AND SAFETY OF THE
PUBLIC SHALL BE PROVIDED AND MAINTAINED THROUGHOUT THE WIDENING AND
CONSTRUCTION OF COUNTY AND STATE ROADWAYS.
SIGNS, LOCATION, NUMBER & ARE NOT APPROVED UNDER THIS DEVELOPMENT
PERMIT. A SEPARATE PERMIT IS REQUIRED FOR EACH SIGN.
ENGINEER & SURVEYOR ASSUMES NO RESPONSIBILITY FOR THE LOCATION
OF UNDERGROUND UTILITIES. CONTRACTOR MUST CONTACT LOCAL GOVERNING
AUTHORITIES PRIOR TO ANY EXCAVATION ON THIS SITE.
CITY OF SIMSBURY DEPT. OF PUBLIC WORKS
SIGNATURE / DATE
SHEET INDEX
D-10181/01 COVER SHEET
DRAWING NO. DESCRIPTION
EROSION CONTROL PLAN
SITE PLAN
FRONT = 50 ft
SIDE = 40 ft
REAR = 50ft
SETBACK DETAIL
UTILITY SIGNATURES
POWER
GAS
CABLE
IRRIGATION
TELEPHONE
VICINITY MAP
N.T.S
D-10181/02
D-10181/03
D-10181/04
D-10181/05
D-10181/06
D-10181/07
Parcel ID 09003128-31022401
Owners MARTIN TIMOTHY
Zoning type Single Family Residential
Parcel Address LARK ROAD
Parcel Address City SIMSBURY
Parcel Address Zip Code 06070
Estimated Size 2.86 Acres
Zoning Code R40
PROPERTY DESCRIPTION
Centroid Coordinates
41.908712, -72.840340
Latitude 41.908712
Longitude -72.840340
GEOGRAPHIC INFORMATION
EROSION CONTROL MISC. DETAILS
Old Farms Rd
Old Farms Rd
Old Farms Rd
Firetown Rd
Firetown Rd
Firetown Rd
Holcomb St
Holcomb St
Holcomb St
Lark Rd
Lark Rd
Surry Cir Fleetwood Dr
Sanctuary DrTollgate Ln
Meadow Crossing Briarwood Dr
Ann Mar LnSmokey Ridge Rd
Wyngate
Wyngate
Barndoor Hills Rd
Barndoor Hills Rd
Bissell Brook
Bissell Brook
SITE
Dogwood Ln
Cardinal Rd
Great Pond
UTILITY PLAN
DRAINAGE PLAN
MISCELLANEOUS DETAILS
GENERAL NOTES:
CONNECTICUT'S AFFORDABLE HOUSING LAW INCLUDES THE STATE'S
REQUIREMENTS FOR MUNICIPALITIES TO HAVE 10% OF THEIR HOUSING STOCK BE
AFFORDABLE, WITH AN OVERRIDE FOR ZONING LAWS UNDER STATUTE 8-30G FOR
TOWNS WITH LESS THAN THE 10% THRESHOLD WHICH SIMSBURY DOES NOT MEET
AND THERE FORE NO ZONING REGULATION WOULD APPLY TO THIS DEVELOPMENT.
WE ARE NOT OBLIGATED TO ADHERE TO ANY ZONING REGULATIONS IN THAT 33%
OF THE PROPOSED RENTAL UNITS WILL QUALIFY AS AFFORDABLE HOUSING UNITS.NOTE:
T*IS PROPOSED DE8ELOP/ENT IS /ADE UNDER CONNECTICUTS AFFORDA$LE
*OUSING LA9 9*IC* INCLUDES T*E STATES RE3UIRE/ENT FOR
/UNICIPALITIES TO *A8E OF T*EIR *OUSING STOCK $E AFFORDA$LE 9IT*
AN O8ERRIDE FOR <ONING LA9S UNDER STATUTE ÄG FOR TO9NS 9IT* LESS
T*AN T*E T*RES*OLD 9*IC* SI/S$UR; DOES NOT /EET AND T*ERE FORE
NO <ONING REGULATIONS 9OULD APPL; TO T*IS DE8ELOP/ENT ADDITIONALL;
T*IS PROPERT; IS IN T*E TO9N OF SI/S$UR; SE9ER DISTRICT AND T*EREFORE
*AS A RIG*T TO CONNECT TO T*E TO9NS SE9ER S;STE/
SURVEY PLAN
D-10181/08
* THIS SITE PLAN IS BASED ON A SURVEY DONE BY JERRY MAHER DATED JAN. 5 2023
*
COVER SHEET
A-01
Date 11 / 23 / 2025
N.T.S
Description
D-10181/01
ScaOe
SKeet
DraZinJ NXPEer
DraZn %\
SH
ENVIRO SOLUTIONS
CIVIL & ENVIRONMENTAL ENGINEERING
SERVICES
00
Revision # Date
LARK ROAD , SIMSBURY, HARTFORD
COUNTY, CONNECTICUT
Page 12 · open in PDF
S76°12'06"E 241.58' S78°19'06"E 38.19' N/F Janet G. Brzezinski DOGWOOD LANE S13°34'30"W 1.58' N/F William D. and Elizabeth A. Sheriffs 40' Side Yard N/F Marcie McDowell 124,643 Sq. Ft. or 2.861 Acres S13°34'30"W 15.00' 20' Easement S76°02'55"E 315.02' N76°02'55"W 312.20' S13°34'30"W 20.00' LARK ROAD S13°34'30"W 15.00' N/F Matthew F. and Michelle Lyons N/F Precourt and Sukprasert-Precourt Living Trust 40' Side Yard N75°07'17"W 206.70' N/F Kevin and Laura Iapichino-Dorr N/F Kevin T. and Kimberly J. Quinn 50' Front Yard S13°34'30"W 215.05' S13°34'30"W 199.66' N5°54'52"E 60.21' N5°54'52"E 20.20' N5°54'52"E192.55' 50' Rear Yard N14°52'39"E 144.55' N63°28'16"W 103.57' N82°51'54"E 65.14' PROPOSED BUILDING-1 (ONE BEDROOM UNITS 12 NOS) PROPOSED BUILDING-2 (ONE BEDROOM UNITS 12 NOS) PARKING PARKING 80.00' 60.00' 60.00' 80.00' DRIVEWAY 20' DRIVEWAY 20' WETLAND WETLAND EXISTING BUILDING 61.18' 44.27' 58.15' 50.00' LEGEND: 1. PROPOSED BUILDING 2. WETLAND 3. PROPOSED DRIVEWAY 4. LOT BOUNDARY 5. SETBACK LINE W N S E SITE PLAN Date 15 0 GRAPHIC SCALE (IN FEET) 15 30 SCALE: 1" = 30' 60 11 / 23 / 2025 Drawing Number D-10181/02 Scale Sheet A1 1"=30' Drawn by MA Revision # 00 Description Date ENVIRO SOLUTIONS CIVIL & ENVIRONMENTAL ENGINEERING SERVICES CAUTION UNDER GROUND UTILITIES: EXISTING UTILITIES AND UNDERGROUND FACILITIES INDICATED ON THESE PLANS HAVE BEEN LOCATED APPROXIMATELY BY SIGHT OR FROM INFORMATION SUPPLIED BY THE VARIOUS OWNERS OF THE FACILITIES. THE ENGINEER AND OWNER DO NOT ACCEPT ANY RESPONSIBILITY FOR THE LOCATIONS SHOWN. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY BOTH HORIZONTALLY AND VERTICALLY THE LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION; TO TAKE NECESSARY PRECAUTIONS TO PROTECT ALL FACILITIES ENCOUNTERED; AND TO NOTIFY THE ENGINEER PROMPTLY OF ALL CONFLICTS WITH THE PROPOSED WORK THE CONTRACTOR SHALL PRESERVE AND PROTECT ALL EXISTING UTILITIES AND FACILITIES FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGE TO THESE FACILITIES BY THE CONTRACTOR SHALL BE REPAIRED BY THE CONTRACTOR AT HIS/HER SOLE EXPENSE. VICINITY MAP N.T.S R CALL NM ONE-CALL SYSTEM SEVEN (7) DAYS PRIOR TO ANY EXCAVATION Old Farms Rd Old Farms Rd Old Farms Rd Firetown Rd Firetown Rd Firetown Rd Holcomb St Holcomb St Holcomb St Lark Rd Lark Rd Surry Cir Fleetwood Dr Sanctuary DrTollgate Ln Meadow Crossing Briarwood Dr Ann Mar LnSmokey Ridge Rd Wyngate Wyngate Barndoor Hills Rd Barndoor Hills Rd Bissell Brook Bissell Brook SITE Dogwood Ln Cardinal Rd Great Pond LARK ROAD , SIMSBURY, HARTFORD COUNTY, CONNECTICUT GENERAL NOTES 1. All work must be in accordance with local building codes and zoning regulations. 2. The contractor is responsible for obtaining all necessary permits before starting construction. 3. The final driveway design must be approved by the local governing body or authority. 4. All construction activities should comply with environmental and stormwater runoff management guidelines. 5. Driveway materials must meet the specifications outlined in the project plans. All materials should be of the highest quality and free from defects. 6. The contractor must ensure proper compaction of subgrade and base materials to ensure a stable and long-lasting surface. 7. Adequate drainage must be provided to prevent water accumulation on the driveway surface. The driveway should slope toward the street or an approved drainage structure. 8. The driveway must have proper access to the street or public road, and any necessary curb cuts or apron installations must be performed as per local standards. 9. Curb cuts must be smooth and have a proper transition to avoid water drainage issues or accidents. 10. The contractor must avoid damaging any underground utilities during excavation or construction activities. Utility lines (water, gas, electricity, etc.) must be located and marked before construction starts. 11. Clear visibility and sight lines must be maintained at the driveway's entrance and exit. 12. The edge of the driveway must be properly constructed to prevent erosion or damage to adjacent landscapes. 13. Any curbing, edging, or fencing should be installed as per the design specifications. 14. Pavement should be properly cured. 15. All surfaces must be smooth, even, and free from cracks, bumps, or depressions. 16. The contractor must implement appropriate traffic control measures during construction (e.g., cones, signs, barriers). 17. Construction hours must follow local noise ordinances, and safety measures should be followed to protect workers and the public. 18. After construction, all debris and construction materials must be removed from the site. 19. The contractor is responsible for restoring the surrounding landscape, which may include re-seeding grass or repairing any damaged landscaping.
Page 13 · open in PDF
S76°12'06"E 241.58' S78°19'06"E 38.19' N/F Janet G. Brzezinski DOGWOOD LANE S13°34'30"W 1.58' N/F William D. and Elizabeth A. Sheriffs 40' Side Yard N/F Marcie McDowell S13°34'30"W 15.00' 20' Easement S76°02'55"E 315.02' N76°02'55"W 312.20' S13°34'30"W 20.00' LARK ROAD S13°34'30"W 15.00' N/F Matthew F. and Michelle Lyons N/F Precourt and Sukprasert-Precourt Living Trust 40' Side Yard N75°07'17"W 206.70' N/F Kevin and Laura Iapichino-Dorr N/F Kevin T. and Kimberly J. Quinn 50' Front Yard S13°34'30"W 215.05' S13°34'30"W 199.66' N5°54'52"E 60.21' N5°54'52"E 20.20' N5°54'52"E192.55' 50' Rear Yard N14°52'39"E 144.55' N63°28'16"W 103.57' N82°51'54"E 65.14' PROPOSED BUILDING-1 (ONE BEDROOM UNITS 12 NOS) PROPOSED BUILDING-2 (ONE BEDROOM UNITS 12 NOS) PARKING PARKING 80.00' 60.00' 60.00' 80.00' DRIVEWAY 20' DRIVEWAY 20' WETLAND WETLAND EXISTING BUILDING 61.18' 44.27' 58.15' 50.00' LEGEND: 1. PROPOSED BUILDING 2. WETLAND 3. PROPOSED SEWER LINE 4. PROPOSED FORCEMAIN 5. PROPOSED WATER LINE 6. PROPOSED ELECTRIC LINE SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SEPTIC TANK SEPTIC TANK PUMP PIT DI FORCEMAIN 2" DIA2" WATER SUPPLY LINE 3" WATER SUPPLY LINE 2" WATER SUPPLY LINE SEWER LINE SEWER LINE SS SS SS SS E E E E E E E E E E E E E E E E E E E E E E E E E E E E OH ELECTRIC LINE OH ELECTRIC LINE E E E E FROM COMMUNITYWATER SUPPLY TO FIRETOWN ROAD EXISTING SEWER SYSTEM1500' AWAY FROM SITE W N S E UTILITY PLAN Date 15 0 GRAPHIC SCALE (IN FEET) 15 30 SCALE: 1" = 30' 60 11 / 23 / 2025 Drawing Number D-10181/03 Scale Sheet A1 1"=30' Drawn by MA Revision # 00 Description Date ENVIRO SOLUTIONS CIVIL & ENVIRONMENTAL ENGINEERING SERVICES CAUTION UNDER GROUND UTILITIES: EXISTING UTILITIES AND UNDERGROUND FACILITIES INDICATED ON THESE PLANS HAVE BEEN LOCATED APPROXIMATELY BY SIGHT OR FROM INFORMATION SUPPLIED BY THE VARIOUS OWNERS OF THE FACILITIES. THE ENGINEER AND OWNER DO NOT ACCEPT ANY RESPONSIBILITY FOR THE LOCATIONS SHOWN. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY BOTH HORIZONTALLY AND VERTICALLY THE LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION; TO TAKE NECESSARY PRECAUTIONS TO PROTECT ALL FACILITIES ENCOUNTERED; AND TO NOTIFY THE ENGINEER PROMPTLY OF ALL CONFLICTS WITH THE PROPOSED WORK THE CONTRACTOR SHALL PRESERVE AND PROTECT ALL EXISTING UTILITIES AND FACILITIES FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGE TO THESE FACILITIES BY THE CONTRACTOR SHALL BE REPAIRED BY THE CONTRACTOR AT HIS/HER SOLE EXPENSE. VICINITY MAP N.T.S R CALL NM ONE-CALL SYSTEM SEVEN (7) DAYS PRIOR TO ANY EXCAVATION Old Farms Rd Old Farms Rd Old Farms Rd Firetown Rd Firetown Rd Firetown Rd Holcomb St Holcomb St Holcomb St Lark Rd Lark Rd Surry Cir Fleetwood Dr Sanctuary DrTollgate Ln Meadow Crossing Briarwood Dr Ann Mar LnSmokey Ridge Rd Wyngate Wyngate Barndoor Hills Rd Barndoor Hills Rd Bissell Brook Bissell Brook SITE Dogwood Ln Cardinal Rd Great Pond LARK ROAD , SIMSBURY, HARTFORD COUNTY, CONNECTICUT GENERAL NOTES 1. This plan is intended to show the general layout of proposed underground and aboveground utility systems, including but not limited to: water, sanitary sewer, storm sewer, gas, electric, telecommunications, and other relevant services. 2. Contractor shall coordinate with all applicable utility companies and governing agencies for final design, approvals, permits, and construction requirements. 3. Existing utility locations shown on this plan are based feasible location. Contractor shall verify all utility locations and depths in the field prior to the start of work. 4. Contractor shall report any discrepancies or conflicts with existing utilities or other proposed improvements to the Engineer and Owner prior to construction. 5. Contractor shall notify the local utility locating service (e.g., 811 or "Call Before You Dig") a minimum of 48–72 hours before commencing excavation work. 6. All trench backfill and compaction shall be in accordance with project specifications and local jurisdiction requirements. 7. Minimum horizontal and vertical separation between utilities shall conform to local codes and standards. Water and sewer lines must maintain a minimum of 10 feet horizontal and 18 inches vertical separation unless otherwise approved. 8. All utilities shall be installed at minimum cover depths as specified by the local authority or utility provider. Coordinate with each provider for required cover. 9. All utilities shall be marked, labeled, and color-coded in accordance with industry standards and local codes. 10. Maintain access to existing utilities and infrastructure during and after construction. All utilities must be located within designated easements or public rights-of-way unless otherwise approved. 11. Contractor shall provide accurate as-built drawings of all installed utilities upon project completion. As-builts must include horizontal locations, depths, materials, and sizes. 12. Contractor shall obtain all necessary permits prior to beginning work and shall schedule required inspections with appropriate agencies. 13. Contractor shall follow best management practices (BMPs) for erosion and sediment control to prevent environmental contamination during utility installation.
Page 14 · open in PDF
S76°12'06"E 241.58' S78°19'06"E 38.19' N/F Janet G. Brzezinski DOGWOOD LANE S13°34'30"W 1.58' N/F William D. and Elizabeth A. Sheriffs 40' Side Yard N/F Marcie McDowell S13°34'30"W 15.00' 20' Easement S76°02'55"E 315.02' N76°02'55"W 312.20' S13°34'30"W 20.00' LARK ROAD S13°34'30"W 15.00' N/F Matthew F. and Michelle Lyons N/F Precourt and Sukprasert-Precourt Living Trust 40' Side Yard N75°07'17"W 206.70' N/F Kevin and Laura Iapichino-Dorr N/F Kevin T. and Kimberly J. Quinn 50' Front Yard S13°34'30"W 215.05' S13°34'30"W 199.66' N5°54'52"E 60.21' N5°54'52"E 20.20' N5°54'52"E192.55' 50' Rear Yard N14°52'39"E 144.55' N63°28'16"W 103.57' N82°51'54"E 65.14' PROPOSED BUILDING-1 (ONE BEDROOM UNITS 12 NOS) PROPOSED BUILDING-2 (ONE BEDROOM UNITS 12 NOS) PARKING PARKING 80.00' 60.00' 60.00' 80.00' DRIVEWAY 20' DRIVEWAY 20' WETLAND WETLAND EXISTING BUILDING 61.18' 44.27' 58.15' 50.00' LEGEND: 1. PROPOSED BUILDING 2. WETLAND 3. PROPOSED DRAINAGE PIPE 4. PROPOSED CATCH BASIN 5. EXISTING CONTOUR MAJOR 6. EXISTING CONTOUR MINOR 7. PROPOSED CONTOUR SS SEPTIC TANK SEPTIC TANK PUMP PIT FROM COMMUNITYWATER SUPPLY TO COMMUNITY SEWER SYSTEM F.F.L 201.50 F.F.L 200.50 200.00 201.00 6" DIA DRAINAGE PIPE 6" DIA DRAINAGE PIPE FROM ROOF FROM ROOF FROM ROOF FROM ROOF CB-2 CB-1 201.00 202.00 199.00 198.00 W N S E GRADING & DRAINAGE PLAN Date 15 0 GRAPHIC SCALE (IN FEET) 15 30 SCALE: 1" = 30' 60 11 / 23 / 2025 Drawing Number D-10181/04 Scale Sheet A1 1"=30' Drawn by MA Revision # 00 Description Date ENVIRO SOLUTIONS CIVIL & ENVIRONMENTAL ENGINEERING SERVICES CAUTION UNDER GROUND UTILITIES: EXISTING UTILITIES AND UNDERGROUND FACILITIES INDICATED ON THESE PLANS HAVE BEEN LOCATED APPROXIMATELY BY SIGHT OR FROM INFORMATION SUPPLIED BY THE VARIOUS OWNERS OF THE FACILITIES. THE ENGINEER AND OWNER DO NOT ACCEPT ANY RESPONSIBILITY FOR THE LOCATIONS SHOWN. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY BOTH HORIZONTALLY AND VERTICALLY THE LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION; TO TAKE NECESSARY PRECAUTIONS TO PROTECT ALL FACILITIES ENCOUNTERED; AND TO NOTIFY THE ENGINEER PROMPTLY OF ALL CONFLICTS WITH THE PROPOSED WORK THE CONTRACTOR SHALL PRESERVE AND PROTECT ALL EXISTING UTILITIES AND FACILITIES FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGE TO THESE FACILITIES BY THE CONTRACTOR SHALL BE REPAIRED BY THE CONTRACTOR AT HIS/HER SOLE EXPENSE. VICINITY MAP N.T.S R CALL NM ONE-CALL SYSTEM SEVEN (7) DAYS PRIOR TO ANY EXCAVATION Old Farms Rd Old Farms Rd Old Farms Rd Firetown Rd Firetown Rd Firetown Rd Holcomb St Holcomb St Holcomb St Lark Rd Lark Rd Surry Cir Fleetwood Dr Sanctuary DrTollgate Ln Meadow Crossing Briarwood Dr Ann Mar LnSmokey Ridge Rd Wyngate Wyngate Barndoor Hills Rd Barndoor Hills Rd Bissell Brook Bissell Brook SITE Dogwood Ln Cardinal Rd Great Pond LARK ROAD , SIMSBURY, HARTFORD COUNTY, CONNECTICUT GENERAL NOTES 1. The contractor shall furnish all labor, materials, tools, and equipment necessary to construct swales, storm pipes, and catch basins as shown on the approved construction drawings and in accordance with these general notes and specifications. 2. All work shall conform to local jurisdictional standards. 3. The contractor shall obtain and comply with all required permits prior to beginning any construction activities, including grading, dewatering, or excavation. 4. All storm pipes shall be installed at the alignments and grades shown on the plans. 5. Minimum pipe slope shall ensure positive drainage (typically not less than 0.5%). 6. Pipe bedding and backfill shall be compacted per project specifications. 7. Catch basins shall be installed at low points and per plan locations. 8. Structures shall be precast or cast-in-place reinforced concrete as per details. 9. Grates shall meet traffic loading requirements and be secured. 10. All inverts, outlet elevations, and pipe connections shall be verified before installation. 11. Swales shall be constructed to the dimensions and slopes shown on the plan. 12. Side slopes shall not exceed 3:1 (horizontal:vertical), unless approved otherwise. 13. Swale flow lines shall maintain continuous positive drainage toward the nearest outfall or catch basin. 14. Erosion control measures (e.g., turf reinforcement mats, sod, or hydroseeding) shall be installed immediately after grading. 15. Install temporary erosion and sediment control measures ( silt fences, inlet protection) prior to start of work. 16. Contractor shall be responsible for all sediment control inspections and maintenance during construction. 17. Any utility conflicts discovered during construction shall be reported to the engineer immediately. 18. All work shall be subject to inspection by the engineer or local authority. 19. Storm pipes shall be tested for proper alignment, grade, and joint integrity. 20. As-built elevations of inverts and top of structures must be submitted for review. 21. All disturbed areas shall be restored to original or better condition. 22. Contractor shall submit red-lined as-builts indicating any deviations from approved plans.
Page 15 · open in PDF
S 76°12'06"E 241.58' S 78°19'06"E 38.19' N/F Janet G. Brzezinski DOGWOOD LANE S 13°34'30"W 1.58' N/F William D. and Elizabeth A. Sheriffs N/F Marcie McDowell S 13°34'30"W 15.00' 20' Easement S 76°02'55"E 315.02' N76°02'55"W 312.20' S 13°34'30"W 20.00' LARK ROAD N/F Matthew F. and Michelle Lyons N/F Precourt and Sukprasert-Precourt Living Trust N75°07'17"W 206.70' N/F Kevin and Laura Iapichino-Dorr N/F Kevin T. and Kimberly J. Quinn S 13°34'30"W 215.05' S 13°34'30"W 199.66' N5°54'52"E 60.21' N5°54'52"E 20.20' N5°54'52"E 192.55' N14°52'39"E 144.55' N63°28'16"W 103.57' N82°51'54"E 65.14' WETLAND WETLAND EXISTING BUILDING LEGEND: 1. CONSTRUCTION ENTRANCE 2. WETLAND 3. SILT FENCE 4. EXISTING CONTOUR MAJOR 5. EXISTING CONTOUR MINOR SEPTIC TANK FROM COMMUNITYWATER SUPPLY TO COMMUNITY SEWER SYSTEM 199.00 198.00 Stock Pile SILT FENCE CONSTRUCTION ENTRANCE / EXIT CONCRETE WASH AREA WASTE DISPOSAL AREA SILT FENCE SILT FENCE W N S E EROSION CONTROL PLAN Date 15 0 GRAPHIC SCALE (IN FEET) 15 30 SCALE: 1" = 30' 60 11 / 23 / 2025 Drawing Number D-10181/05 Scale Sheet A1 1"=30' Drawn by MA Revision # 00 Description Date ENVIRO SOLUTIONS CIVIL & ENVIRONMENTAL ENGINEERING SERVICES VICINITY MAP N.T.S R CALL NM ONE-CALL SYSTEM SEVEN (7) DAYS PRIOR TO ANY EXCAVATION Old Farms Rd Old Farms Rd Old Farms Rd Firetown Rd Firetown Rd Firetown Rd Holcomb St Holcomb St Holcomb St Lark Rd Lark Rd Surry Cir Fleetwood Dr Sanctuary DrTollgate Ln Meadow Crossing Briarwood Dr Ann Mar LnSmokey Ridge Rd Wyngate Wyngate Barndoor Hills Rd Barndoor Hills Rd Bissell Brook Bissell Brook SITE Dogwood Ln Cardinal Rd Great Pond LARK ROAD , SIMSBURY, HARTFORD COUNTY, CONNECTICUT GENERAL NOTES 1. This plan addresses the grading, drainage, and erosion control requirements for the project site to ensure proper surface water management and minimize adverse impacts on adjacent properties and downstream drainage systems. 2. All grading and drainage improvements shall comply with local municipal codes, ordinances, and the latest edition of applicable engineering standards, including stormwater management regulations. 3. The site shall be graded to promote positive drainage away from all structures and paved surfaces. 4. Finished grades shall be sloped at a minimum of 2% away from buildings for at least 5 feet to prevent water infiltration. 5. Cut and fill slopes shall be stabilized and shall not exceed the maximum allowable slope as per local codes (typically 3:1 or 2:1, unless otherwise approved). 6. Existing natural drainage patterns should be preserved where possible. Where changes occur, new drainage systems shall safely convey runoff without causing erosion or flooding to adjacent properties. 7. Temporary erosion control measures such as silt fences, sediment basins, and straw wattles shall be installed before grading begins and maintained until vegetation is established. Permanent stabilization measures shall be implemented immediately after grading. 8. The project shall incorporate stormwater management best practices to control runoff quantity and improve runoff quality as required by regulatory agencies. 9. All drainage structures including swales, inlets, and storm pipe shall be designed to accommodate the required design storm events as specified by the local authority. 10. Regular inspection and maintenance of drainage facilities and erosion control measures shall be performed throughout construction and post-construction phases to ensure proper functioning. 11. All grading activities shall coordinate with existing utilities. Conflicts shall be resolved prior to grading work. 12. Measures shall be taken to protect sensitive environmental areas, including wetlands, waterways, and tree preservation zones. 13. All disturbed areas shall be stabilized with seed, mulch, or other acceptable ground cover immediately upon completion of grading. 14. Soil compaction shall be conducted as required to prevent future settlement. 15. Dewatering during grading must be managed to prevent sediment discharge off-site. 16. The contractor is responsible for implementing and maintaining all erosion and sediment control measures and for ensuring compliance with the grading and drainage plan. CURB INLET STORM PROTECTION B.M.P. 1.08 N.T.S. GRAVEL FILLED SANDBAGS STACKED TIGHTLY GRAVEL CONSTRUCTION ENTRANCE B.M.P. 1.01 CATCH BASIN/ CURB INLET BACK OF SIDEWALK BACK OF CURB FLOW SILT FENCE DETAIL N.T.S SIDE VIEW FRONT VIEW INLET PROTECTION N.T.S $/P /AINTENANCE SC*EDULE STABILIZED CONSTRUCTION ENTRANCE RECOMMENDED MAINTENANCE FREQUENCY BYBMP WEEKLY AND AFTER RAIN STORM EVENTS CONTRACTOR SILT FENCE WEEKLY AND AFTER RAIN STORM EVENTS CONTRACTOR
Page 16 · open in PDF
IR IR Mon Mon IP Mon IP Mon Mon IR IR WF 10 WF 9 WF 8 WF 7 WF 6 WF 5 WF 4 WF 3 WF 2 WF 1 WF 50 WF 49 WF 48 WF 47 WF 46 WF 45WF 44WF 43WF 42 WF 41WF 40WF 39 WF 38 WF 37 WF 36 WF 35 WF 34 WF 33 WF 32 WF 31 WF 30 WF 29 WF 27 WF 26 WF 25 WF 24 WF 23 WF 22 WF 21 WF 20 WF 19 WF 18 WF 17 WF 16 WF 15 WF 14 WF 13 WF 12 WF 11 15" FL=196.85 Storm MH TF=199.71 INV=195.51 WG CB TF=199.64 UP 2683 Helco 22 Mailbox CB TF=199.72 21" Oak Helco 2210 18" Maple Concrete Pad Building Woods Wetlands Wetlands Spring Pond Wire Fence DOGWOOD LANE LARK ROAD Woods 40’ Side Yard 50’ Front Yard 40’ Side Yard Stone Wall Remnants Stone Wall Remnants 50’ Rear Yard N/F William D. and Elizabeth A. Sheriffs N/F Janet G. Brzezinski N/F Marcie McDowell N/F Matthew F. and Michelle Lyons N/F Kevin T. and Kimberly J. Quinn N/F Kevin and Laura Iapichino-Dorr N/F Precourt and Sukprasert-Precourt Living Trust 199 198 198 197 196 197 198 198 199 199 199 199 200 200 200 201 201199 200 200 200 201 201 201 201 202 S76°02'55"E 315.02’ N76°02'55"W 312.20’ S13°34'30"W 15.00’ S13°34'30"W 20.00’ S13°34'30"W 15.00’ S13°34'30"W 215.05’ N75°07'17"W 206.70’ N14°52'39"E 144.55’ N63°28'16"W 103.57’ N5°54'52"E 60.21’ N5°54'52"E 20.20’ N5°54'52"E 192.55’ S76°12'06"E 241.58’ N82°51'54"E 65.14’ S78°19'06"E 38.19’ S13°34'30"W 1.58’ S13°34'30"W 199.66’ 20’ Easement 124,643 Sq. Ft. or 2.861 Acres Notes: 1. Parcel is located in Zone R-40 Residential 2. Horizontal Datum - Map Reference #2 , Vertical Datum - Assumed Map References: 1. Ann-Mar Estates, Section II, Property of Annie K and Ralph E. Holcombe, Holcomb Street and Firetown Road, Simsbury, Connecticut, Office of Harold R. Sanderson, C.E & L.S., Bloomfield, Connecticut, Scale 1"=100’, January 26, 1965, Design by Yarwood and Block, Simsbury, Conn. 2. Division Plan, Prepared for Tim Martin, 9 Dogwood Lane, Simsbury, Conn. Datd January 18, 2012, scale 1"=40’, Prepared by Henry C. Cotton & Associates. NOT VALID WITHOUT RAISED SEAL THIS SURVEY AND MAP HAS BEEN PREPARED IN ACCORDANCE WITH SECTIONS 20-300b-1 THRU 20 OF THE REGULATIONS OF CONNECTICUT STATE AGENCIES - "MINIMUM STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ENDORSED BY THE CONNECTICUT ASSOCIATION OF LAND SURVEYORS, INC. THIS IS A PROPERTY SURVEY BASED UPON A DEPENDENT RESURVEY. CLASS OF ACCURACY: CLASS A-2 Graphic Scale: 0’ 90’60’30’15’30’ Map Showing Land Owned by: Timothy Martin Lark Road Simsbury Connecticut Scale: 1"=30’ January 5, 2023 Prepared By Neriani Land Surveying, LLC 56 Hillcrest Drive - Barkhamsted, Connecticut 06063 (860) 677-7732 D-10181-06
Page 17 · open in PDF
ROUND FRAME & FILTER ASSEMBLY MODEL # R-100A ELEVATION VIEW PLAN VIEW ISOMETRIC VIEW GRASSING SCHEDULE Ds1 DISTURBED AREA STABILIZATION (WITH MULCHING ONLY) DEFINITION A temporary cover of plant residues or other suitable materials, produced on site if possible, applied to the soil surface. PURPOSE • Reduce runoff and erosion • Modify soil temperature • Conserve moisture • Prevent surface compaction and crusting • Control undesirable vegetation • Increase biological activity in the soil INSTALLATION • Apply mulch or temporary grassing to all exposed areas within 14 days of disturbance. • Applicable to graded or cleared areas where seedings may not have a suitable growing season to produce an erosion retardant cover. • Mulch can be used as a singular erosion control device for up to 6 months. • Apply at the appropriate depth. Refer to Table 1 for specific materials. Ds2 DISTURBED AREA STABILIZATION (WITH TEMPORARY SEEDING) DEFINITION The establishment of temporary vegetative cover with fast growing seedings for seasonal protection on disturbed or denuded areas. PURPOSE • Reduce runoff and sediment damage of down stream resources • Protect the soil surface from erosion • Improve wildlife habitat • Improve aesthetics • Improve tilth, infiltration, and aeration as well as organic matter for permanent plantings INSTALLATION • Apply mulch or temporary grassing to all exposed areas within 14 days of disturbance. • Applicable to rough graded areas that will be exposed for less than 6 months. • Coordinate with permanent measures to ensure economical and effective stabilization. • Take note of which species are not appropriate for companion crop plantings. • When the soil has been sealed by rainfall or consists of smooth cut slopes, scarify the soil in order to provide a place for the seed to lodge and germinate. GREEN HIGH-FLOW MATERIAL POCKET FILLED w/ ROCK FOR WEIGHT. ROCK PROVIDED BY PURCHASER GRAY HIGH-EFFICIENCY MATERIAL 5.5" CENTER DRAINAGE HOLE 12 DRAINAGE SLOTS IN TOP 48 DRAINAGE SLOTS AROUND PERIMETER 8.5" SLOT LENGTH 3.5" SLOT WIDTH @ WIDE END 1.5" SLOT WIDTH @ NARROW END FILTER OPTIONS FILTER HAT IS AVAILABLE IN THREE OPTIONS: 1) ALL HIGH-FLOW MATERIAL 2) ALL HIGH-EFFICIENCY MATERIAL 3) HIGH-FLOW MATERIAL ON TOP HALF OF HAT, HIGH-EFFICIENCY MATERIAL ON BOTTOM HALF (THIS FILTER COVER IS RECOMMENDED FOR ALL ROADWAY PROJECTS.) IT IS THE PURCHASERS RESPONSIBILITY TO PURCHASE APPROPRIATE FILTER HAT. PURCHASER SHALL PROVIDE ROCK FOR FILTER POCKETS. FILTER HAT INSTALLATION FILTER HAT SLIDES DIRECTLY OVER FILTER FRAME. TO KEEP FILTER FRAME IN PLACE OVER STORM STRUCTURE, ROCK POCKETS ARE SEWN DIRECTLY IN TO FILTER HAT MATERIAL EVERY FILTER HAT COMES IN ONE PIECE FOR EASY INTALLATION. MAINTENANCE ALL TEMPORARY EROSION, SEDIMENTATION, & POLLUTION CONTROL PRACTICES SHOULD BE INSPECTED DAILY. CONTRACTOR SHALL REMOVE SEDIMENT AND DISPOSE OF IN A PROPER MANNER. INSPECT R-100A DAILY FOR CUTS, ABRASIONS, AND PROPER INSTALLATION. REPLACE OR REPOSITION AS NECESSARY. SPECIFICATION FILTER FABRIC SILT-SAVER HAT SHALL BE BASED ON DESIGN PROFESSIONAL'S SPECIFICATION. DUE TO NARROW SLOT, A TRANSITION WILL OCCUR BETWEEN WEIR AND ORIFICE CONDITION. ORIFICE FLOW WILL PROVIDE A MORE CONSERVATIVE ESTIMATE OF FLOW, THEREFOR THE LESSER OF THE ORIFICE AND WEIR FLOWS WILL BE USED FOR EACH STAGE CALCULATION. FILTER MATERIAL ALLOWS 129 gpm/SF OR 0.29cfs/SF ORIFICE EQUATION (O) = Q = 0.6A(2gh)^0.5 P = FEET PERIMETER h = HEAD IN FEET Q = CAPACITY IN cfs A = FREE OPEN AREA OF FRAME g = 32.2 FEET-PER-SECOND/SECOND 3.25" SLOT WIDTH @ WIDE END 2.0" SLOT WIDTH @ NARROW END 61.5" DIA. 51.0" DIA. 43.0" DIA. 1.625"8.625" 5.5" 31.5" 19" 61.5" DIA. HEAD - 3.0' 1.0' 2.5' 2.0' 1.5' 0.5' 0.0' 0 0 0 0 0 0 0.5 1.0 1.5 2.0 2.5 3.0 2.1 3.9 7.0 8.0 9.2 9.2 7 19 41 54 70 77 6 12 18 24 30 - 2 3 5 7 9 77 FRAME & FILTER DISCHARGE ANALYSIS HEAD (FT) EQUATION USED OPENING AREA (SF) FRAME FLOW (CFS) FILTER AREA (SF) FILTERED FLOW (CFS) CURB INLET STORM PROTECTION B.M.P. 1.08 N.T.S. GRAVEL FILLED SANDBAGS STACKED TIGHTLY GRAVEL CONSTRUCTION ENTRANCE B.M.P. 1.01 CATCH BASIN/ CURB INLET BACK OF SIDEWALK BACK OF CURB FLOW STORM INLET PROTECTION BMP 1.08 HAY BALES ANCHOR BALES W/ 2" X 4" (2) STAKES PER BALE ALL AROUND CATCH BASIN FILTER FABRIC TO BE PLACE UNDER CATCH BASIN GRATE N.T.S. EROSION CONTROL DETAILS Date 11 / 23 / 2025 Drawing Number D-10181/07 Scale Sheet A1 Drawn by MA Revision # 00 Description Date ENVIRO SOLUTIONS CIVIL & ENVIRONMENTAL ENGINEERING SERVICES LARK ROAD , SIMSBURY, HARTFORD COUNTY, CONNECTICUT
Page 18 · open in PDF
NOTES 1. PLACE MARKER IN A PROTECTED LOCATION AT EDGE OF RIGHT-OF-WAY 2. MAKER REQUIRED FOR ALL VALVES EXCEPT AT FIRE HYDRANTS. LETTER "V" CAST INTO TOP RIGHT-OF-WAY 1'-0 (TYPICAL) 4" SQUARE CONCRETE POST WITH 1-#4 REBAR FINISH GRADE ELEVATION 2'-6"2'-6" (MINIMUM) METER BOX 3 4" TEE LOT LINE METER BOX 3 4" MIN. SERVICE LINE 3 4" MIN. SERVICE LINE 2" PVC CASING SERVICE LINE (1" MIN.) CUTOFF VALVE TURN UP (APPROX. LOCATION) METER BOX 3 4" MIN. SERVICE LINE 3 4" TEE SERVICE LINE (1" MIN.) CUTOFF VALVE METER BOX 3 4" MIN. SERVICE LINE CORPORATION STOP LOT LINE CORPORATION STOP WATER MAIN BACK OF CURB PAVEMENT PARKWAY SIDEWALK (IF APPLICABLE) 18'X18' METER BOX & LID 24" MIN WATER METER FLARED X I.P BALL VALVE OR PLUG TYPE SERVICE - PLUG OR CONNECT TO PLUMBER LINE WATER MAIN BEHIND CURB FLARED WATER MAIN IN STREET NO COUPLING ALLOWED UNLESS SERVICE PIPE EXCEED 20' TYPE K COOPER SERVICE LINE WATER SERVICE INSTALLATION " 1"OR 3" LINE NOTE: LOCATION OF METER BOX WITHIN PARKWAY SHALL BE SPECIFIED BY THE CITY. NOTE: METER BOX AND LID INFORMATION SHALL BE SUPPLIED BY THE CITY. SERVICE PIPE INSTALLED LEVEL THROUGH METER BOX. METER WILL BE SUPPLIED BY CITY. FLARED X A.W.W.A. TAPERED CORP. STOP WSIVEL NUT X M.I.P. METER COUPLINGS CONNECTION DETAIL PLAN STREET LATERAL ON-SITE LATERAL FLOW 6" SERVICE RIGH OF WAY FLOW WYE WYE ANGULAR RISER SECTION MIN. GRADE 1/8" PER FT WYE CRUSHED STONE BEDDING. FULL WIDTH OF TRENCH 45° MIN. 6'-0" MIN. DETECTION TAPE 18" TO 24" BELOW GRADE WITH WORDS "CAUTION SEWR PIPE" 6" MIN. CLR. TEMPORARY PLUG 5'-0" MIN. R/W DETENTION WIRE FINISHED GRADE PVC MARKER CLASS "B" CONCRETE 3000 PSI CLEANOUT CASTING 3'X2'X14" DEEP FOUNDATION INSTALL WATER TIGHT REMOVABLE PLUG 6" CLEANOUT STACK CLASS "B" CONCRETE 3000 PSI 22.5° BEND 4" MIN. 4" MIN. CLASS "B" CONCRETE 3000 PSI FOR GREATER THAN 10' DEPTH, USE STANDARD MANHOLE. SECTION A-A GRANULAR MATERIAL - SEC. 504.2.2.2 OR FINE CRUSHED ROCK- SEC. 504.2.2.2.(a) FIRST JOINT FROM 22.5° BEND TO BE A REDUCER TO 6" IF MAIN IS LARGER THAN 6" CLEANOUT CASTING OPENING TO BE INSTALLED CENTERED OVER THE CENTERLINE OF THE CLEANOUT STACK EXTENDED TO GROUND LEVEL MISCELLANEOUS DETAIL Date 11 / 23 / 2025 Drawing Number D-10181/08 Scale Sheet A1 Drawn by MA Revision # 00 Description Date ENVIRO SOLUTIONS CIVIL & ENVIRONMENTAL ENGINEERING SERVICES LARK ROAD , SIMSBURY, HARTFORD COUNTY, CONNECTICUT
Page 19 · open in PDF
Page 20 · open in PDF
Page 21 · open in PDF
Page 22 · open in PDF
Page 23 · open in PDF
Page 24 · open in PDF
Page 25 · open in PDF
Page 26 · open in PDF
Page 27 · open in PDF
Page 28 · open in PDF
Page 29 · open in PDF
Page 30 · open in PDF
Page 31 · open in PDF
Agenda: archived copy, SHA-256 07d3e137d6c6…. Packet: archived copy, SHA-256 0e68e10cd292….