CT Public Docs Tracker

Towns / Simsbury / Conservation Commission/Inland Wetlands and Watercourses Agency / Nov 17, 2026

Conservation Commission/Inland Wetlands and Watercourses Agency, Nov 17, 2026

Simsbury no minutes yet

Documents

TypeDocumentPagesOpen
agenda Conservation Commission/Inland Wetlands and Watercourses Agency Meeting 1 PDF download · town site
packet Conservation Commission/Inland Wetlands and Watercourses Agency Meeting (packet) 31 PDF download · town site

Summary of the agenda

AI-generated summary. Each line links to the PDF page it came from; check it before relying on it. An agenda lists what the board planned to take up; it does not record decisions.

Read the official agenda (PDF, 1 page) The PDF is the record; this summary is a guide to it.

This is the agenda for the November 17, 2026 meeting of the Conservation Commission/Inland Wetlands and Watercourses Agency. It lists applications for 0 Lark Rd, 3 Clover Lane, and three designated agent administrative approvals, but.

On the agenda (5)

  1. CC 26-06 - 0 Lark Rd (Vacant Parcel), application and plans · p. 1
  2. CC 26-25 - 3 Clover Lane, revised application dated 10-23-26 · p. 1
  3. Designated Agent Administrative Approval - CC 26-23, 7 Orchard Lane (agent approval letter) · p. 1
  4. Designated Agent Administrative Approval - CC 26-24, 111 West Street (agent approval letter) · p. 1
  5. Designated Agent Administrative Approval - CC 26-26, 4 Washburn Dr (agent approval letter) · p. 1

Full text of the documents

View the agenda PDF on this page (Conservation Commission/Inland Wetlands and Watercourses Agency Meeting) Open the PDF
Text of the agenda (Conservation Commission/Inland Wetlands and Watercourses Agency Meeting, 1 page)

Page 1 · open in PDF

Conservation Commission/Inland Wetlands And Watercourses Agency Agenda
11-17-26 AGENDA.PDF
CC 26-06 0 Lark Rd (Vacant Parcel)
CC 26-06 LARK ROAD APPLICATION AND NARRATIVE - REDACTED 
VERSION.PDF
CC 26-06 LARK ROAD PLANS.PDF
CC 26-25 3 Clover Lane
CC 26-25 3 CLOVER LANE REVISED APPLICATION 10-23-26 - REDACTED.PDF
Designated Agent Administrative Approvals
CC 26-23 7 ORCHARD LANE AGENT APPROVAL LETTER.PDF
CC 26-24 111 WEST STREET AGENT APPROVAL LETTER.PDF
CC 26-26 4 WASHBURN DR AGENT APPROVAL LETTER.PDF
1. 7:00 P.M.
Documents:
2. 7:00 P.M.
Documents:
3. 7:00 P.M.
Documents:
4.
Documents:
View the packet PDF on this page (Conservation Commission/Inland Wetlands and Watercourses Agency Meeting (packet)) Open the PDF
Text of the packet (Conservation Commission/Inland Wetlands and Watercourses Agency Meeting (packet), 31 pages)

Page 1 · open in PDF

Conservation Commission/Inland Wetlands And Watercourses Agency Agenda
11-17-26 AGENDA.PDF
CC 26-06 0 Lark Rd (Vacant Parcel)
CC 26-06 LARK ROAD APPLICATION AND NARRATIVE - REDACTED 
VERSION.PDF
CC 26-06 LARK ROAD PLANS.PDF
CC 26-25 3 Clover Lane
CC 26-25 3 CLOVER LANE REVISED APPLICATION 10-23-26 - REDACTED.PDF
Designated Agent Administrative Approvals
CC 26-23 7 ORCHARD LANE AGENT APPROVAL LETTER.PDF
CC 26-24 111 WEST STREET AGENT APPROVAL LETTER.PDF
CC 26-26 4 WASHBURN DR AGENT APPROVAL LETTER.PDF
1. 7:00 P.M.
Documents:
2. 7:00 P.M.
Documents:
3. 7:00 P.M.
Documents:
4.
Documents:

Page 2 · open in PDF

 
 
 
 
   
   
 
 
 
Page 1 of 2 
 
Conservation Commission/Inland Wetlands and Watercourses Agency 
Regular Meeting  
November 17, 2026, at 7:00 PM 
Town Hall-BOE Conference Room 
933 Hopmeadow Street, Simsbury, CT, 06070 
AGENDA 
 
I.  CALL TO ORDER & SEATING OF ALTERNATES 
 
II.  APPROVAL OF MINUTES 
 
October 20, 2026 
 
III. IWWA APPLICATION(S) FOR RECEIPT AND DETERMINATION 
OF SIGNIFICANCE 
 
• Application CC #26-06 of Timothy Martin, Applicant and Owner, 
for a wetlands permit to construct 24 multi-family units in two 
structures within the upland review area on the undeveloped 2.86 
acre lot at the end of Lark Road, sometimes referred to as 0 Lark 
Road (Assessor’s Map D03, Block 208, Lot 003A) Simsbury, CT 
06070, R-40. The project is proposed under Section 8-30g of the State 
Statutes, the Affordable Housing Appeals Act. 
 
• Application CC #26-25 of James Allen, Applicant, for a wetlands 
permit to construct a ± 1250 sq.ft. patio within the upland review 
area at 3 Clover Lane (Assessor’s Map E15, Block 120, Lot 013) 
Weatogue, CT 06089, R-40. 
 
IV. IWWA APPLICATION(S) FOR PUBLIC HEARING OR ACTION 
 
• None 
 
V. CONSERVATION COMMISSION AND OTHER IWWA BUSINESS 
 
• Election of Officers 
 

Page 3 · open in PDF

Page 2 of 2 
 
• Discussion regarding amending Conservation Commission/Inland 
Wetlands and Watercourses Agency By-laws/Rules of Procedure to 
add “Public Audience” to Agendas for regular and special meetings, 
pursuant to the adopted Town Charter Review amendments. 
 
 
VI. DESIGNATED AGENT ACTIONS AND OTHER REPORTS 
 
• Application CC #26-23 of Alexander and Shannon Stangle, 
Applicant, for a wetlands permit to remove trees and stumps within 
the upland review area at 7 Orchard Lane (Assessor’s Map D16, 
Block 419, Lot 046) Simsbury, CT 06070, R-40. 
 
• Application CC #26-24 of Dung Q. Tran, Applicant, for a wetlands 
permit to replace an existing concrete 1576 sq.ft. patio with stone and 
pavers and associated access walk in the upland review area at 111 
West Street (Assessor’s Map F11, Block 103, Lot 013) Simsbury, CT 
06070, B-2. 
 
• Application CC #26-26 of Tim Glover, Applicant, for a wetlands 
permit to construct a 20’ x 25’, two story addition in the upland 
review area, approximately 65’ from the wetland soils at 4 Washburn 
Drive (Assessor’s Map F09, Block 147, Lot 004) Simsbury, CT 06070, 
R-40. 
 
 
VII. ADJOURNMENT 
 

Page 4 · open in PDF

Page 5 · open in PDF

Page 6 · open in PDF

Page 7 · open in PDF

Page 8 · open in PDF

Page 9 · open in PDF

Page 10 · open in PDF

Page 11 · open in PDF

LARK ROAD
SITE CIVIL PLANS FOR
NOVEMBER 2025
LARK ROAD, SIMSBURY, HARTFORD COUNTY,
CONNECTICUT
NO CERTIFICATE OF OCCUPANCY WILL BE ISSUED UNTIL ALL SITE IMPROVEMENTS
HAVE BEEN MADE.
ALL CONCRETE TO HAVE POLYPROPYLENE FIBER MESH UNLESS SPECIFIED
OTHERWISE BY SITE ENGINEER.  1 1/2 LB. FIBER MESH PER CUBIC
YARD OF CONCRETE.
ADD BACK FLOW PREVENTIVE TO WATER METER. BACK FLOW PREVENTIVE TO BE
WATTS 007 SERIES DOUBLE CHECK OR EQUAL.
CONTRACTOR TO CONTACT LOCAL UTILITY AUTHORITIES PRIOR TO ANY
EXCAVATION.
EXACT LOCATION OF ALL UTILITY TIE-INS TO BE CHOSEN BY APPROPRIATE
AUTHORITIES.
GENERAL NOTES:
1. NOTIFY CITY OF SIMSBURY INSPECTOR 24 HOURS BEFORE BEGINNING
           EACH PHASE OF CONSTRUCTION.
2. EROSION CONTROL MEASURE TO BE INSTALLED & MAINTAINED PRIOR TO ANY
           CONSTRUCTION ON SITE AND MAINTAIN UNTIL PERMANENT GROUND
           COVER IS ESTABLISHED.
3. ALL DISTURBED AREAS WITHOUT PAVEMENT THAT ARE DISTURBED ARE TO BE
           COVERED WITH MULCH OR SEED WITHIN 14 DAYS OF LAST DISTURBANCE.
4. ALL WORK SHALL COMPLY WITH APPLICABLE STATE, FEDERAL &
           LOCAL CODES AND ALL NECESSARY LICENSES AND PERMITS SHALL
           BE OBTAINED BY THE CONTRACTOR AT HIS EXPENSE UNLESS
           PREVIOUSLY OBTAINED BY THE OWNER.
5. ALL WORK SHALL BE PERFORMED IN A FINISHED AND WORKMANLIKE
           MANNER TO THE ENTIRE SATISFACTION OF THE OWNER, AND IN
           ACCORDANCE WITH THE BEST RECOGNIZED TRADE PRACTICES.
6. DEVIATIONS FROM THESE PLANS AND SPECIFICATIONS WITHOUT THE
           PRIOR CONSENT OF THE ENGINEER OR OWNER MAYBE CAUSE FOR THE
           WORK TO BE UNACCEPTABLE TO THE OWNER.
7. THE UTILITIES SHOWN ARE SHOWN FOR THE CONTRACTOR'S
           CONVENIENCE ONLY. THERE MAY BE OTHER UTILITIES NOT
           SHOWN ON THESE PLANS. THE ENGINEER ASSUMES NO
           RESPONSIBILITY FOR THE LOCATIONS SHOWN AND IT SHALL BE THE
           CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATIONS OF ALL
           UTILITIES WITHIN THE LIMITS OF THE WORK. ALL DAMAGE MADE TO
           EXISTING UTILITIES BY THE CONTRACTOR'S SHALL BE THE SOLE
           RESPONSIBILITY OF THE CONTRACTOR.
8. ALL MATERIALS SHALL BE NEW.
9. ALL WORK PERFORMED ON CITY, COUNTY AND/OR STATE HIGHWAYS
           SHALL BE IN STRICT CONFORMANCE WITH APPLICABLE DEPT OF
           TRANSPORTATION STANDARDS AND SPECIFICATIONS.
10. UNLESS INDICATED OTHERWISE ON THE PLAN THE CONTRACTOR SHALL
           REMOVE AND DISPOSE OF ALL EXISTING IMPROVEMENTS AND TREES,
           WITHIN THE LIMITS OF THE WORK, FROM THE SITE. ON SITE.
           BURIAL OF TREES AND OTHER DEBRIS  WILL NOT BE TOLERATED.
11. THE CONTRACTOR SHALL PROVIDE CLEAN, SUITABLE EARTH FOR
           REQUIRED FILL.
12. ALL FILL SHALL BE FREE OF ORGANIC OR OTHER DELETERIOUS
          MATERIAL AND PLACED TO 95% OF THE MAXIMUM STANDARD PROCTOR
          DENSITY (ASTM-698-70) UNLESS OTHERWISE INDICATED ON THE
          PLANS. THE FILL SHALL BE PLACED IN LIFTS NOT TO EXCEED SIX
         (6) INCHES OF COMPACTED FILL THICKNESS.
13. THE CONTRACTOR SHALL FURNISH AND MAINTAIN ALL NECESSARY
           BARRICADES AROUND THE WORK AND SHALL PROVIDE PROTECTION
           AGAINST WATER DAMAGE AND SOIL EROSION.
14. ACREAGE OF THE UNIT OR SITE: 1.148 ACRES.
15. ALL CONSTRUCTION MUST CONFORM THE GOVERNING AGENCY
           STANDARDS AND SPECIFICATIONS.
16. ALL SILT BARRIERS MUST BE PLACED AS ACCESS IS OBTAINED
           DURING CLEARING. NO GRADING SHALL BE DONE UNTIL SILT
           BARRIER INSTALLATION ARE CONSTRUCTED.
17. SILT BARRIERS TO BE PLACED AS SHOWN AND/OR AS DIRECTED BY
           PROJECT ENGINEER AND/OR GOVERNING AGENCY INSPECTOR. NOTIFY
           INSPECTOR 24 HOURS PRIOR TO CONSTRUCTION.
18. "AS BUILT" OF ROADWAYS, STORM DRAINS, SEWERS AND WATER
           REQUIRED PRIOR TO ACCEPTANCE. IF REQUIRED BY COUNTY OR
           DEVELOPER.
19. THIS PROJECT TO BE SERVED BY PUBLIC GRAVITY SEWER.
           ALL SEWERS MUST BE GRAVITY FED UNLESS SPECIFICALLY
           APPROVED BY CITY OF SIMSBURY AND SO NOTED ON THE PLANS.
20. WATER SERVICE TO BE PROVIDED BY CITY OF SIMSBURY WATER AND
           SEWER DEPARTMENT.
21. ADDITIONAL EROSION CONTROL DEVICES TO BE USED AS REQUIRED
           BY GOVERNING AGENCY.
22. BERMUDA SOD TO BE ROLLED AND APPLY SAND AS REQUIRED TO LEVEL.
23. ALL UNPAVED AREAS MUST BE TEMPORARILY SEEDED WITH RYE, WHEAT AND
           WEEPING LOVE GRASS AND MULCHED WITH PINE STRAW AT I BALE
           SQUARE FEET AS SOON AS CONSTRUCTION PHASES PERMIT.
24. TEMPORARY SEEDLINGS DO NOT RELIEVE THE CONTRACTOR'S
           RESPONSIBILITY OF PLANTING BERMUDA SOD.
25. IF REQUIRED, NO CERTIFICATE OF OCCUPANCY WILL BE ISSUED PRIOR TO THE
           SUBMITTAL, REVIEW, AND APPROVAL OF A FINAL PLANT TO SUBDIVIDED THE PROPERTY.
26. CONCRETE CURB & GUTTER TO BE 2,500 PSI AT 28 DAYS.
27. CONTRACTOR SHALL PROVIDE & MAINTAIN OF STREET PARKING ON
           THE PROPERTY DURING THE ENTIRE CONSTRUCTION PERIOD.
28. CONTRACTOR SHALL PROVIDE & MAINTAIN OFF STREET PARKING ON
           THE PROPERTY DURING THE ENTIRE CONSTRUCTION PERIOD.
29. BASED ON THE INFORMATION SHOWN ON THE NATIONAL FLOOD INSURANCE
           PROGRAM
30. ALL EROSION AND SEDIMENTATION CONTROLS, AND TREE PROTECTION MEASURES SHALL
           BE INSTALLED PRIOR TO GRADING.
31. SIGNING AND STRIPING TO BE PROVIDED BY THE DEVELOPER ACCORDING TO
           CITY OF SIMSBURY SPECIFICATIONS.
32. BORING OF ROAD MAY BE REQUIRED FOR WATER AND/OR SEWER CONNECTIONS.
DEVELOPMENT SERVICES PERMITTING DISCLAIMER:
THE APPROVAL OF THE THESE PLANS AND THE ISSUANCE OF THIS LAND DISTURBANCE
PERMIT DOES NOT IN ANY WAY SUGGEST THAT ALL OTHER REQUIREMENTS FOR
THE LEGAL OR APPROPRIATE OPERATIONS FOR THIS ACTIVITY, WHICH MAY REQUIRE
ADDITIONAL PERMITTING, HAVE BEEN MET. THE ONUS IS ON THE OWNER/DEVELOPER/BUILDER
TO DISCOVER WHAT ADDITIONAL PERMITTING OR APPROVALS NAY BE NECESSARY TO
OPERATE FROM THIS POINT IN AN APPROPRIATE AND LEGAL MANNER. PLAN APPROVAL
OR PERMIT ISSUANCE DOES NOT ABSOLVE THE APPLICANT FROM COMPLYING WITH ALL
APPLICABLE LAWS, POLICIES, STANDARDS OR OTHER PERMITS WHICH MAY BE REQUIRED
FOR THIS PROJECT.
1. Maximum side slopes are 2:1 All finished grading
          shall be done as to provide position drainage
          and eliminate trapped water in low areas.
2. Contractor shall verify all existing topographic
          feature and conditions prior to the start of
          construction, and shall notify the engineer
          immediately of any discrepancies.
3. Any relocation and/or removal of existing water
          & sewer utilities shall be approved by and coordinated with
          CITY OF SIMSBURY.
4. All connections to existing utilities and all utility
           installations shall be in compliance with
          CITY OF SIMSBURY requirements.
5. If any conflicts or discrepancies are found on the
          construction documents or in the field, the Contractor
          must notify the Engineer immediately, and not commence
          operations until the conflicts or discrepancies have
          been resolved
GENERAL NOTES:
GENERAL NOTES:
NECESSARY BARRICADES, SUFFICIENT LIGHTS AND OTHER TRAFFIC CONTROL
METHODS AS MAY BE NECESSARY FOR THE PROTECTION AND SAFETY OF THE
PUBLIC SHALL BE PROVIDED AND MAINTAINED THROUGHOUT THE WIDENING AND
CONSTRUCTION OF COUNTY AND STATE ROADWAYS.
SIGNS, LOCATION, NUMBER & ARE NOT APPROVED UNDER THIS DEVELOPMENT
PERMIT. A SEPARATE PERMIT IS REQUIRED FOR EACH SIGN.
ENGINEER & SURVEYOR ASSUMES NO RESPONSIBILITY FOR THE LOCATION
OF UNDERGROUND UTILITIES. CONTRACTOR MUST CONTACT LOCAL GOVERNING
AUTHORITIES PRIOR TO ANY EXCAVATION ON THIS SITE.
CITY OF SIMSBURY DEPT. OF PUBLIC WORKS
SIGNATURE / DATE
SHEET INDEX
D-10181/01 COVER SHEET
DRAWING NO. DESCRIPTION
EROSION CONTROL PLAN
SITE PLAN
FRONT  = 50 ft
SIDE = 40 ft
REAR = 50ft
SETBACK DETAIL
UTILITY SIGNATURES
POWER 
GAS 
CABLE 
IRRIGATION 
TELEPHONE 
VICINITY MAP
N.T.S
D-10181/02
D-10181/03
D-10181/04
D-10181/05
D-10181/06
D-10181/07
Parcel ID 09003128-31022401
Owners MARTIN TIMOTHY
Zoning type Single Family Residential
Parcel Address LARK ROAD
Parcel Address City SIMSBURY
Parcel Address Zip Code 06070
Estimated Size 2.86 Acres
Zoning Code R40
PROPERTY DESCRIPTION
Centroid Coordinates
41.908712, -72.840340
Latitude 41.908712
Longitude -72.840340
GEOGRAPHIC INFORMATION
EROSION CONTROL MISC. DETAILS
Old Farms Rd
Old Farms Rd
Old Farms Rd
Firetown Rd
Firetown Rd
Firetown Rd
Holcomb St
Holcomb St
Holcomb St
Lark Rd
Lark Rd
Surry Cir Fleetwood Dr
Sanctuary DrTollgate Ln
Meadow Crossing Briarwood Dr
Ann Mar LnSmokey Ridge Rd
Wyngate
Wyngate
Barndoor Hills Rd
Barndoor Hills Rd
Bissell Brook
Bissell Brook
SITE
Dogwood Ln
Cardinal Rd
Great Pond
UTILITY PLAN
DRAINAGE PLAN
MISCELLANEOUS DETAILS
GENERAL NOTES:
CONNECTICUT'S AFFORDABLE HOUSING LAW INCLUDES THE STATE'S
REQUIREMENTS FOR MUNICIPALITIES TO HAVE 10% OF THEIR HOUSING STOCK BE
AFFORDABLE, WITH AN OVERRIDE FOR ZONING LAWS UNDER STATUTE 8-30G FOR
TOWNS WITH LESS THAN THE 10% THRESHOLD WHICH SIMSBURY DOES NOT MEET
AND THERE FORE NO ZONING REGULATION WOULD APPLY TO THIS DEVELOPMENT.
WE ARE NOT OBLIGATED TO ADHERE TO ANY ZONING REGULATIONS IN THAT 33%
OF THE PROPOSED RENTAL UNITS WILL QUALIFY AS AFFORDABLE HOUSING UNITS.NOTE:
T*IS PROPOSED DE8ELOP/ENT IS /ADE UNDER CONNECTICUTžS AFFORDA$LE
*OUSING LA9 9*IC*  INCLUDES T*E STATEžS RE3UIRE/ENT FOR
/UNICIPALITIES TO *A8E  OF T*EIR *OUSING STOCK $E AFFORDA$LE 9IT*
AN O8ERRIDE FOR <ONING LA9S UNDER STATUTE ÄG FOR TO9NS 9IT* LESS
T*AN T*E  T*RES*OLD 9*IC* SI/S$UR; DOES NOT /EET AND T*ERE FORE
NO <ONING REGULATIONS 9OULD APPL; TO T*IS DE8ELOP/ENT ADDITIONALL;
T*IS PROPERT; IS IN T*E TO9N OF SI/S$UR; SE9ER DISTRICT AND T*EREFORE
*AS A RIG*T TO CONNECT TO T*E TO9NžS SE9ER S;STE/
SURVEY PLAN
D-10181/08
* THIS SITE PLAN IS BASED ON A SURVEY DONE BY JERRY MAHER DATED JAN. 5 2023
*
COVER SHEET
A-01
Date 11  / 23 / 2025
N.T.S
Description
D-10181/01
ScaOe
SKeet
DraZinJ NXPEer
DraZn %\
SH
ENVIRO SOLUTIONS
CIVIL & ENVIRONMENTAL ENGINEERING
SERVICES
00
Revision # Date
LARK ROAD , SIMSBURY, HARTFORD
COUNTY, CONNECTICUT

Page 12 · open in PDF

S76°12'06"E
241.58'
S78°19'06"E
38.19'
N/F
Janet G. Brzezinski
DOGWOOD
LANE
S13°34'30"W
1.58'
N/F
William D. and Elizabeth A. Sheriffs
40' Side Yard
N/F
Marcie McDowell
124,643 Sq. Ft.
or 2.861 Acres
S13°34'30"W
15.00'
20' Easement
S76°02'55"E
315.02'
N76°02'55"W
312.20'
S13°34'30"W
20.00'
LARK ROAD
S13°34'30"W
15.00'
N/F
Matthew F. and Michelle Lyons
N/F
Precourt and Sukprasert-Precourt Living Trust
40' Side Yard
N75°07'17"W
206.70'
N/F
Kevin and Laura Iapichino-Dorr
N/F
Kevin T. and Kimberly J. Quinn
50' Front Yard
S13°34'30"W
215.05'
S13°34'30"W
199.66'
N5°54'52"E
60.21'
N5°54'52"E
20.20'
N5°54'52"E192.55'
50' Rear Yard
N14°52'39"E
144.55'
N63°28'16"W
103.57'
N82°51'54"E
65.14'
PROPOSED BUILDING-1
(ONE BEDROOM UNITS
12 NOS)
PROPOSED BUILDING-2
(ONE BEDROOM UNITS
12 NOS)
PARKING
PARKING
80.00'
60.00'
60.00'
80.00'
DRIVEWAY 20'
DRIVEWAY 20'
WETLAND
WETLAND
EXISTING
BUILDING
61.18'
44.27'
58.15'
50.00'
LEGEND:
1. PROPOSED BUILDING
2. WETLAND
3. PROPOSED DRIVEWAY
4. LOT BOUNDARY
5. SETBACK LINE
W
N
S
E
SITE PLAN
Date
15 0
GRAPHIC SCALE
(IN FEET)
15 30
SCALE: 1" = 30'
60
11 / 23 / 2025
Drawing Number
D-10181/02
Scale
Sheet
A1
1"=30'
Drawn by
MA
Revision #
00
Description Date
ENVIRO SOLUTIONS
CIVIL & ENVIRONMENTAL ENGINEERING
SERVICES
CAUTION  UNDER GROUND UTILITIES:
EXISTING UTILITIES AND UNDERGROUND FACILITIES INDICATED ON THESE PLANS HAVE BEEN
LOCATED APPROXIMATELY BY SIGHT OR FROM INFORMATION SUPPLIED BY THE VARIOUS OWNERS
OF THE FACILITIES. THE ENGINEER AND OWNER DO NOT ACCEPT ANY RESPONSIBILITY FOR THE
LOCATIONS SHOWN.  IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY BOTH
HORIZONTALLY AND VERTICALLY THE LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION; TO
TAKE NECESSARY PRECAUTIONS TO PROTECT ALL FACILITIES ENCOUNTERED; AND TO NOTIFY THE
ENGINEER PROMPTLY OF ALL CONFLICTS WITH THE PROPOSED WORK THE CONTRACTOR SHALL
PRESERVE AND PROTECT ALL EXISTING UTILITIES AND FACILITIES FROM DAMAGE DURING
CONSTRUCTION. ANY DAMAGE TO THESE FACILITIES BY THE CONTRACTOR SHALL BE REPAIRED BY
THE CONTRACTOR AT HIS/HER SOLE EXPENSE.
VICINITY MAP
N.T.S
R
CALL NM ONE-CALL
SYSTEM SEVEN (7) DAYS
PRIOR TO ANY EXCAVATION
Old Farms Rd
Old Farms Rd
Old Farms Rd
Firetown Rd
Firetown Rd
Firetown Rd
Holcomb St
Holcomb St
Holcomb St
Lark Rd
Lark Rd
Surry Cir Fleetwood Dr
Sanctuary DrTollgate Ln
Meadow Crossing Briarwood Dr
Ann Mar LnSmokey Ridge Rd
Wyngate
Wyngate
Barndoor Hills Rd
Barndoor Hills Rd
Bissell Brook
Bissell Brook
SITE
Dogwood Ln
Cardinal Rd
Great Pond
LARK ROAD , SIMSBURY, HARTFORD
COUNTY, CONNECTICUT
 GENERAL NOTES
1. All work must be in accordance with local building codes and zoning regulations.
2. The contractor is responsible for obtaining all necessary permits before starting
construction.
3. The final driveway design must be approved by the local governing body or
authority.
4. All construction activities should comply with environmental and stormwater runoff
management guidelines.
5. Driveway materials must meet the specifications outlined in the project plans. All
materials should be of the highest quality and free from defects.
6. The contractor must ensure proper compaction of subgrade and base materials to
ensure a stable and long-lasting surface.
7. Adequate drainage must be provided to prevent water accumulation on the
driveway surface.
The driveway should slope toward the street or an approved drainage structure.
8. The driveway must have proper access to the street or public road, and any
necessary curb cuts or apron installations must be performed as per local
standards.
9. Curb cuts must be smooth and have a proper transition to avoid water drainage
issues or accidents.
10. The contractor must avoid damaging any underground utilities during excavation
or construction activities.
Utility lines (water, gas, electricity, etc.) must be located and marked before
construction starts.
11. Clear visibility and sight lines must be maintained at the driveway's entrance and
exit.
12. The edge of the driveway must be properly constructed to prevent erosion or
damage to adjacent landscapes.
13. Any curbing, edging, or fencing should be installed as per the design
specifications.
14. Pavement should be properly cured.
15. All surfaces must be smooth, even, and free from cracks, bumps, or depressions.
16. The contractor must implement appropriate traffic control measures during
construction (e.g., cones, signs, barriers).
17. Construction hours must follow local noise ordinances, and safety measures
should be followed to protect workers and the public.
18. After construction, all debris and construction materials must be removed from the
site.
19. The contractor is responsible for restoring the surrounding landscape, which may
include re-seeding grass or repairing any damaged landscaping.

Page 13 · open in PDF

S76°12'06"E
241.58'
S78°19'06"E
38.19'
N/F
Janet G. Brzezinski
DOGWOOD
LANE
S13°34'30"W
1.58'
N/F
William D. and Elizabeth A. Sheriffs
40' Side Yard
N/F
Marcie McDowell
S13°34'30"W
15.00'
20' Easement
S76°02'55"E
315.02'
N76°02'55"W
312.20'
S13°34'30"W
20.00'
LARK ROAD
S13°34'30"W
15.00'
N/F
Matthew F. and Michelle Lyons
N/F
Precourt and Sukprasert-Precourt Living Trust
40' Side Yard
N75°07'17"W
206.70'
N/F
Kevin and Laura Iapichino-Dorr
N/F
Kevin T. and Kimberly J. Quinn
50' Front Yard
S13°34'30"W
215.05'
S13°34'30"W
199.66'
N5°54'52"E
60.21'
N5°54'52"E
20.20'
N5°54'52"E192.55'
50' Rear Yard
N14°52'39"E
144.55'
N63°28'16"W
103.57'
N82°51'54"E
65.14'
PROPOSED BUILDING-1
(ONE BEDROOM UNITS
12 NOS)
PROPOSED BUILDING-2
(ONE BEDROOM UNITS
12 NOS)
PARKING
PARKING
80.00'
60.00'
60.00'
80.00'
DRIVEWAY 20'
DRIVEWAY 20'
WETLAND
WETLAND
EXISTING
BUILDING
61.18'
44.27'
58.15'
50.00'
LEGEND:
1. PROPOSED BUILDING
2. WETLAND
3. PROPOSED SEWER LINE
4. PROPOSED FORCEMAIN
5. PROPOSED WATER LINE
6. PROPOSED ELECTRIC LINE
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS SS SS SS SS
SS
SEPTIC TANK
SEPTIC TANK
PUMP PIT
DI FORCEMAIN 2" DIA2" WATER SUPPLY LINE
3" WATER SUPPLY LINE
2" WATER SUPPLY LINE
SEWER LINE
SEWER LINE
SS SS SS SS
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
OH ELECTRIC LINE
OH ELECTRIC LINE
E
E
E E
FROM COMMUNITYWATER SUPPLY
TO FIRETOWN ROAD
EXISTING SEWER
SYSTEM1500' AWAY
FROM SITE
W
N
S
E
UTILITY PLAN
Date
15 0
GRAPHIC SCALE
(IN FEET)
15 30
SCALE: 1" = 30'
60
11 / 23 / 2025
Drawing Number
D-10181/03
Scale
Sheet
A1
1"=30'
Drawn by
MA
Revision #
00
Description Date
ENVIRO SOLUTIONS
CIVIL & ENVIRONMENTAL ENGINEERING
SERVICES
CAUTION  UNDER GROUND UTILITIES:
EXISTING UTILITIES AND UNDERGROUND FACILITIES INDICATED ON THESE PLANS HAVE BEEN
LOCATED APPROXIMATELY BY SIGHT OR FROM INFORMATION SUPPLIED BY THE VARIOUS OWNERS
OF THE FACILITIES. THE ENGINEER AND OWNER DO NOT ACCEPT ANY RESPONSIBILITY FOR THE
LOCATIONS SHOWN.  IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY BOTH
HORIZONTALLY AND VERTICALLY THE LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION; TO
TAKE NECESSARY PRECAUTIONS TO PROTECT ALL FACILITIES ENCOUNTERED; AND TO NOTIFY THE
ENGINEER PROMPTLY OF ALL CONFLICTS WITH THE PROPOSED WORK THE CONTRACTOR SHALL
PRESERVE AND PROTECT ALL EXISTING UTILITIES AND FACILITIES FROM DAMAGE DURING
CONSTRUCTION. ANY DAMAGE TO THESE FACILITIES BY THE CONTRACTOR SHALL BE REPAIRED BY
THE CONTRACTOR AT HIS/HER SOLE EXPENSE.
VICINITY MAP
N.T.S
R
CALL NM ONE-CALL
SYSTEM SEVEN (7) DAYS
PRIOR TO ANY EXCAVATION
Old Farms Rd
Old Farms Rd
Old Farms Rd
Firetown Rd
Firetown Rd
Firetown Rd
Holcomb St
Holcomb St
Holcomb St
Lark Rd
Lark Rd
Surry Cir Fleetwood Dr
Sanctuary DrTollgate Ln
Meadow Crossing Briarwood Dr
Ann Mar LnSmokey Ridge Rd
Wyngate
Wyngate
Barndoor Hills Rd
Barndoor Hills Rd
Bissell Brook
Bissell Brook
SITE
Dogwood Ln
Cardinal Rd
Great Pond
LARK ROAD , SIMSBURY, HARTFORD
COUNTY, CONNECTICUT
 GENERAL NOTES
1. This plan is intended to show the general layout of proposed
underground and aboveground utility systems, including but not limited
to: water, sanitary sewer, storm sewer, gas, electric,
telecommunications, and other relevant services.
2. Contractor shall coordinate with all applicable utility companies and
governing agencies for final design, approvals, permits, and
construction requirements.
3. Existing utility locations shown on this plan are based feasible location.
Contractor shall verify all utility locations and depths in the field prior to
the start of work.
4. Contractor shall report any discrepancies or conflicts with existing
utilities or other proposed improvements to the Engineer and Owner
prior to construction.
5. Contractor shall notify the local utility locating service (e.g., 811 or "Call
Before You Dig") a minimum of 48–72 hours before commencing
excavation work.
6. All trench backfill and compaction shall be in accordance with project
specifications and local jurisdiction requirements.
7. Minimum horizontal and vertical separation between utilities shall
conform to local codes and standards. Water and sewer lines must
maintain a minimum of 10 feet horizontal and 18 inches vertical
separation unless otherwise approved.
8. All utilities shall be installed at minimum cover depths as specified by
the local authority or utility provider. Coordinate with each provider for
required cover.
9. All utilities shall be marked, labeled, and color-coded in accordance
with industry standards and local codes.
10. Maintain access to existing utilities and infrastructure during and after
construction. All utilities must be located within designated easements
or public rights-of-way unless otherwise approved.
11. Contractor shall provide accurate as-built drawings of all installed
utilities upon project completion. As-builts must include horizontal
locations, depths, materials, and sizes.
12. Contractor shall obtain all necessary permits prior to beginning work
and shall schedule required inspections with appropriate agencies.
13. Contractor shall follow best management practices (BMPs) for erosion
and sediment control to prevent environmental contamination during
utility installation.

Page 14 · open in PDF

S76°12'06"E
241.58'
S78°19'06"E
38.19'
N/F
Janet G. Brzezinski
DOGWOOD
LANE
S13°34'30"W
1.58'
N/F
William D. and Elizabeth A. Sheriffs
40' Side Yard
N/F
Marcie McDowell
S13°34'30"W
15.00'
20' Easement
S76°02'55"E
315.02'
N76°02'55"W
312.20'
S13°34'30"W
20.00'
LARK ROAD
S13°34'30"W
15.00'
N/F
Matthew F. and Michelle Lyons
N/F
Precourt and Sukprasert-Precourt Living Trust
40' Side Yard
N75°07'17"W
206.70'
N/F
Kevin and Laura Iapichino-Dorr
N/F
Kevin T. and Kimberly J. Quinn
50' Front Yard
S13°34'30"W
215.05'
S13°34'30"W
199.66'
N5°54'52"E
60.21'
N5°54'52"E
20.20'
N5°54'52"E192.55'
50' Rear Yard
N14°52'39"E
144.55'
N63°28'16"W
103.57'
N82°51'54"E
65.14'
PROPOSED BUILDING-1
(ONE BEDROOM UNITS
12 NOS)
PROPOSED BUILDING-2
(ONE BEDROOM UNITS
12 NOS)
PARKING
PARKING
80.00'
60.00'
60.00'
80.00'
DRIVEWAY 20'
DRIVEWAY 20'
WETLAND
WETLAND
EXISTING
BUILDING
61.18'
44.27'
58.15'
50.00'
LEGEND:
1. PROPOSED BUILDING
2. WETLAND
3. PROPOSED DRAINAGE PIPE
4. PROPOSED CATCH BASIN
5. EXISTING CONTOUR MAJOR
6. EXISTING CONTOUR MINOR
7. PROPOSED CONTOUR 
SS
SEPTIC TANK
SEPTIC TANK
PUMP PIT
FROM COMMUNITYWATER SUPPLY
TO COMMUNITY
SEWER SYSTEM
F.F.L 201.50
F.F.L 200.50
200.00
201.00
6" DIA DRAINAGE PIPE
6" DIA DRAINAGE PIPE
FROM
ROOF
FROM
ROOF
FROM
ROOF
FROM
ROOF
CB-2
CB-1
201.00
202.00
199.00
198.00
W
N
S
E
GRADING &
DRAINAGE PLAN
Date
15 0
GRAPHIC SCALE
(IN FEET)
15 30
SCALE: 1" = 30'
60
11 / 23 / 2025
Drawing Number
D-10181/04
Scale
Sheet
A1
1"=30'
Drawn by
MA
Revision #
00
Description Date
ENVIRO SOLUTIONS
CIVIL & ENVIRONMENTAL ENGINEERING
SERVICES
CAUTION  UNDER GROUND UTILITIES:
EXISTING UTILITIES AND UNDERGROUND FACILITIES INDICATED ON THESE PLANS HAVE BEEN
LOCATED APPROXIMATELY BY SIGHT OR FROM INFORMATION SUPPLIED BY THE VARIOUS OWNERS
OF THE FACILITIES. THE ENGINEER AND OWNER DO NOT ACCEPT ANY RESPONSIBILITY FOR THE
LOCATIONS SHOWN.  IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY BOTH
HORIZONTALLY AND VERTICALLY THE LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION; TO
TAKE NECESSARY PRECAUTIONS TO PROTECT ALL FACILITIES ENCOUNTERED; AND TO NOTIFY THE
ENGINEER PROMPTLY OF ALL CONFLICTS WITH THE PROPOSED WORK THE CONTRACTOR SHALL
PRESERVE AND PROTECT ALL EXISTING UTILITIES AND FACILITIES FROM DAMAGE DURING
CONSTRUCTION. ANY DAMAGE TO THESE FACILITIES BY THE CONTRACTOR SHALL BE REPAIRED BY
THE CONTRACTOR AT HIS/HER SOLE EXPENSE.
VICINITY MAP
N.T.S
R
CALL NM ONE-CALL
SYSTEM SEVEN (7) DAYS
PRIOR TO ANY EXCAVATION
Old Farms Rd
Old Farms Rd
Old Farms Rd
Firetown Rd
Firetown Rd
Firetown Rd
Holcomb St
Holcomb St
Holcomb St
Lark Rd
Lark Rd
Surry Cir Fleetwood Dr
Sanctuary DrTollgate Ln
Meadow Crossing Briarwood Dr
Ann Mar LnSmokey Ridge Rd
Wyngate
Wyngate
Barndoor Hills Rd
Barndoor Hills Rd
Bissell Brook
Bissell Brook
SITE
Dogwood Ln
Cardinal Rd
Great Pond
LARK ROAD , SIMSBURY, HARTFORD
COUNTY, CONNECTICUT
 GENERAL NOTES
1. The contractor shall furnish all labor, materials, tools, and equipment
necessary to construct swales, storm pipes, and catch basins as shown on
the approved construction drawings and in accordance with these general
notes and specifications.
2. All work shall conform to local jurisdictional standards.
3. The contractor shall obtain and comply with all required permits prior to
beginning any construction activities, including grading, dewatering, or
excavation.
4. All storm pipes shall be installed at the alignments and grades shown on
the plans.
5. Minimum pipe slope shall ensure positive drainage (typically not less than
0.5%).
6. Pipe bedding and backfill shall be compacted per project specifications.
7. Catch basins shall be installed at low points and per plan locations.
8. Structures shall be precast or cast-in-place reinforced concrete as per
details.
9. Grates shall meet traffic loading requirements and be secured.
10. All inverts, outlet elevations, and pipe connections shall be verified before
installation.
11. Swales shall be constructed to the dimensions and slopes shown on the
plan.
12. Side slopes shall not exceed 3:1 (horizontal:vertical), unless approved
otherwise.
13. Swale flow lines shall maintain continuous positive drainage toward the
nearest outfall or catch basin.
14. Erosion control measures (e.g., turf reinforcement mats, sod, or
hydroseeding) shall be installed immediately after grading.
15. Install temporary erosion and sediment control measures ( silt fences, inlet
protection) prior to start of work.
16. Contractor shall be responsible for all sediment control inspections and
maintenance during construction.
17. Any utility conflicts discovered during construction shall be reported to the
engineer immediately.
18. All work shall be subject to inspection by the engineer or local authority.
19. Storm pipes shall be tested for proper alignment, grade, and joint integrity.
20. As-built elevations of inverts and top of structures must be submitted for
review.
21. All disturbed areas shall be restored to original or better condition.
22. Contractor shall submit red-lined as-builts indicating any deviations from
approved plans.

Page 15 · open in PDF

S 76°12'06"E 
241.58'
S 78°19'06"E 
38.19'
N/F
Janet G. Brzezinski
DOGWOOD
LANE
S 13°34'30"W
1.58'
N/F
William D. and Elizabeth A. Sheriffs
N/F
Marcie McDowell
S 13°34'30"W
15.00'
20' Easement
S 76°02'55"E 
315.02'
N76°02'55"W
312.20'
S 13°34'30"W
20.00'
LARK ROAD
N/F
Matthew F. and Michelle Lyons
N/F
Precourt and Sukprasert-Precourt Living Trust
N75°07'17"W
206.70'
N/F
Kevin and Laura Iapichino-Dorr
N/F
Kevin T. and Kimberly J. Quinn
S 13°34'30"W
215.05'
S 13°34'30"W
199.66'
N5°54'52"E 
60.21'
N5°54'52"E 
20.20'
N5°54'52"E 192.55'
N14°52'39"E 
144.55'
N63°28'16"W
103.57'
N82°51'54"E 
65.14'
WETLAND
WETLAND
EXISTING
BUILDING
LEGEND:
1. CONSTRUCTION ENTRANCE
2. WETLAND
3. SILT FENCE
4. EXISTING CONTOUR MAJOR
5. EXISTING CONTOUR MINOR
SEPTIC TANK
FROM COMMUNITYWATER SUPPLY
TO COMMUNITY
SEWER SYSTEM
199.00
198.00
Stock Pile
SILT FENCE
CONSTRUCTION
ENTRANCE / EXIT
CONCRETE
WASH AREA
WASTE DISPOSAL
AREA
SILT FENCE
SILT FENCE
W
N
S
E
EROSION
CONTROL PLAN
Date
15 0
GRAPHIC SCALE
(IN FEET)
15 30
SCALE: 1" = 30'
60
11 / 23 / 2025
Drawing Number
D-10181/05
Scale
Sheet
A1
1"=30'
Drawn by
MA
Revision #
00
Description Date
ENVIRO SOLUTIONS
CIVIL & ENVIRONMENTAL ENGINEERING
SERVICES
VICINITY MAP
N.T.S
R
CALL NM ONE-CALL
SYSTEM SEVEN (7) DAYS
PRIOR TO ANY EXCAVATION
Old Farms Rd
Old Farms Rd
Old Farms Rd
Firetown Rd
Firetown Rd
Firetown Rd
Holcomb St
Holcomb St
Holcomb St
Lark Rd
Lark Rd
Surry Cir Fleetwood Dr
Sanctuary DrTollgate Ln
Meadow Crossing Briarwood Dr
Ann Mar LnSmokey Ridge Rd
Wyngate
Wyngate
Barndoor Hills Rd
Barndoor Hills Rd
Bissell Brook
Bissell Brook
SITE
Dogwood Ln
Cardinal Rd
Great Pond
LARK ROAD , SIMSBURY, HARTFORD
COUNTY, CONNECTICUT
 GENERAL NOTES
1. This plan addresses the grading, drainage, and erosion control requirements for the
project site to ensure proper surface water management and minimize adverse
impacts on adjacent properties and downstream drainage systems.
2. All grading and drainage improvements shall comply with local municipal codes,
ordinances, and the latest edition of applicable engineering standards, including
stormwater management regulations.
3. The site shall be graded to promote positive drainage away from all structures and
paved surfaces.
4. Finished grades shall be sloped at a minimum of 2% away from buildings for at
least 5 feet to prevent water infiltration.
5. Cut and fill slopes shall be stabilized and shall not exceed the maximum allowable
slope as per local codes (typically 3:1 or 2:1, unless otherwise approved).
6. Existing natural drainage patterns should be preserved where possible. Where
changes occur, new drainage systems shall safely convey runoff without causing
erosion or flooding to adjacent properties.
7. Temporary erosion control measures such as silt fences, sediment basins, and
straw wattles shall be installed before grading begins and maintained until
vegetation is established. Permanent stabilization measures shall be implemented
immediately after grading.
8. The project shall incorporate stormwater management best practices to control
runoff quantity and improve runoff quality as required by regulatory agencies.
9. All drainage structures including swales, inlets, and storm pipe shall be designed to
accommodate the required design storm events as specified by the local authority.
10. Regular inspection and maintenance of drainage facilities and erosion control
measures shall be performed throughout construction and post-construction phases
to ensure proper functioning.
11. All grading activities shall coordinate with existing utilities. Conflicts shall be
resolved prior to grading work.
12. Measures shall be taken to protect sensitive environmental areas, including
wetlands, waterways, and tree preservation zones.
13. All disturbed areas shall be stabilized with seed, mulch, or other acceptable ground
cover immediately upon completion of grading.
14. Soil compaction shall be conducted as required to prevent future settlement.
15. Dewatering during grading must be managed to prevent sediment discharge
off-site.
16. The contractor is responsible for implementing and maintaining all erosion and
sediment control measures and for ensuring compliance with the grading and
drainage plan.
CURB INLET STORM PROTECTION B.M.P. 1.08
N.T.S.
GRAVEL
FILLED
SANDBAGS
STACKED
TIGHTLY
GRAVEL CONSTRUCTION ENTRANCE B.M.P. 1.01
CATCH BASIN/
CURB INLET
BACK OF
SIDEWALK BACK OF
CURB
FLOW
SILT FENCE DETAIL
N.T.S
SIDE VIEW
FRONT VIEW
INLET PROTECTION
N.T.S
$/P /AINTENANCE SC*EDULE
STABILIZED
CONSTRUCTION
ENTRANCE
RECOMMENDED
MAINTENANCE
FREQUENCY
BYBMP
WEEKLY AND AFTER
RAIN  STORM
EVENTS
CONTRACTOR
SILT FENCE
WEEKLY AND
AFTER RAIN
STORM EVENTS
CONTRACTOR

Page 16 · open in PDF

IR
IR
Mon
Mon
IP Mon
IP
Mon
Mon
IR
IR
WF 10
WF 9
WF 8
WF 7
WF 6
WF 5
WF 4
WF 3
WF 2
WF 1
WF 50
WF 49
WF 48
WF 47
WF 46
WF 45WF 44WF 43WF 42 WF 41WF 40WF 39
WF 38
WF 37
WF 36
WF 35
WF 34
WF 33
WF 32
WF 31
WF 30
WF 29
WF 27
WF 26
WF 25
WF 24 WF 23
WF 22
WF 21
WF 20
WF 19
WF 18
WF 17
WF 16
WF 15
WF 14
WF 13
WF 12
WF 11
15" FL=196.85
Storm MH
TF=199.71
INV=195.51
WG
CB
TF=199.64
UP 2683
Helco
22
Mailbox
CB
TF=199.72
21" Oak
Helco
2210
18" Maple
Concrete
Pad
Building
Woods
Wetlands
Wetlands
Spring
Pond
Wire Fence
DOGWOOD
LANE
LARK ROAD
Woods
40’ Side Yard
50’ Front Yard
40’ Side Yard
Stone Wall Remnants
Stone Wall Remnants
50’ Rear Yard
N/F
William D. and Elizabeth A. Sheriffs
N/F
Janet G. Brzezinski
N/F
Marcie McDowell
N/F
Matthew F. and Michelle Lyons
N/F
Kevin T. and Kimberly J. Quinn
N/F
Kevin and Laura Iapichino-Dorr
N/F
Precourt and Sukprasert-Precourt Living Trust
199
198
198
197
196
197
198
198
199
199
199
199
200
200
200
201
201199
200
200
200
201
201
201
201
202
S76°02'55"E
315.02’
N76°02'55"W
312.20’
S13°34'30"W
15.00’
S13°34'30"W
20.00’
S13°34'30"W
15.00’
S13°34'30"W
215.05’
N75°07'17"W
206.70’
N14°52'39"E
144.55’
N63°28'16"W
103.57’
N5°54'52"E
60.21’
N5°54'52"E
20.20’
N5°54'52"E
192.55’
S76°12'06"E
241.58’
N82°51'54"E
65.14’
S78°19'06"E
38.19’
S13°34'30"W
1.58’
S13°34'30"W
199.66’
20’ Easement
124,643 Sq. Ft.
or 2.861 Acres
Notes:
1. Parcel is located in Zone  R-40 Residential
2. Horizontal Datum - Map Reference #2 , Vertical
Datum - Assumed
Map References:
1. Ann-Mar Estates, Section II, Property of Annie K
and Ralph E. Holcombe, Holcomb Street and
Firetown Road, Simsbury, Connecticut, Office of
Harold R. Sanderson, C.E & L.S., Bloomfield,
Connecticut, Scale 1"=100’, January 26, 1965,
Design by Yarwood and Block, Simsbury, Conn.
2. Division Plan, Prepared for Tim Martin, 9 Dogwood
Lane, Simsbury, Conn. Datd January 18, 2012,
scale 1"=40’, Prepared by Henry C. Cotton &
Associates.
NOT VALID WITHOUT RAISED SEAL
THIS SURVEY AND MAP HAS BEEN PREPARED IN ACCORDANCE
WITH SECTIONS 20-300b-1 THRU 20 OF THE REGULATIONS OF
CONNECTICUT STATE AGENCIES - "MINIMUM STANDARDS FOR
SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS
ENDORSED BY THE CONNECTICUT ASSOCIATION OF LAND
SURVEYORS, INC.
THIS IS A PROPERTY SURVEY BASED UPON A DEPENDENT
RESURVEY.
CLASS OF ACCURACY:                 CLASS A-2
Graphic Scale:
0’ 90’60’30’15’30’
Map Showing
Land Owned by:
Timothy Martin
Lark Road
Simsbury Connecticut
Scale: 1"=30’  January 5, 2023
Prepared By
 Neriani Land Surveying, LLC
  56 Hillcrest Drive  - Barkhamsted, Connecticut 06063
 (860) 677-7732
D-10181-06

Page 17 · open in PDF

ROUND FRAME & FILTER
ASSEMBLY MODEL # R-100A
ELEVATION VIEW
PLAN VIEW
ISOMETRIC VIEW
GRASSING SCHEDULE
Ds1 DISTURBED AREA
STABILIZATION
(WITH MULCHING ONLY)
DEFINITION
A temporary cover of plant residues or other
suitable materials, produced on site if possible,
applied to the soil surface.
PURPOSE
• Reduce runoff and erosion
• Modify soil temperature
• Conserve moisture
• Prevent surface compaction and crusting
• Control undesirable vegetation
• Increase biological activity in the soil
INSTALLATION
• Apply mulch or temporary grassing to all
exposed areas within 14 days of disturbance.
• Applicable to graded or cleared areas where
seedings may not have a suitable growing
season to produce an erosion retardant cover.
• Mulch can be used as a singular erosion control
device for up to 6 months.
• Apply at the appropriate depth. Refer to Table
1 for specific materials.
Ds2 DISTURBED AREA
STABILIZATION
(WITH TEMPORARY SEEDING)
DEFINITION
The establishment of temporary vegetative cover
with fast growing seedings for seasonal protection
on disturbed or denuded areas.
PURPOSE
• Reduce runoff and sediment damage of down
stream resources
• Protect the soil surface from erosion
• Improve wildlife habitat
• Improve aesthetics
• Improve tilth, infiltration, and aeration as well as
organic matter for permanent plantings
INSTALLATION
• Apply mulch or temporary grassing to all
exposed areas within 14 days of disturbance.
• Applicable to rough graded areas that will be
exposed for less than 6 months.
• Coordinate with permanent measures to ensure
economical and effective stabilization.
• Take note of which species are not appropriate
for companion crop plantings.
• When the soil has been sealed by rainfall or
consists of smooth cut slopes, scarify the soil
in order to provide a place for the seed to lodge
and germinate.
GREEN HIGH-FLOW
MATERIAL
POCKET FILLED w/
ROCK FOR WEIGHT.
ROCK PROVIDED BY
PURCHASER
GRAY HIGH-EFFICIENCY
MATERIAL
5.5" CENTER
DRAINAGE HOLE
12 DRAINAGE
SLOTS IN TOP
48 DRAINAGE
SLOTS AROUND
PERIMETER
8.5" SLOT LENGTH
3.5" SLOT WIDTH
@ WIDE END
1.5" SLOT WIDTH
@ NARROW END
FILTER OPTIONS
FILTER HAT IS AVAILABLE IN THREE OPTIONS:
1) ALL HIGH-FLOW MATERIAL
2) ALL HIGH-EFFICIENCY MATERIAL
3) HIGH-FLOW MATERIAL ON TOP HALF OF HAT,
HIGH-EFFICIENCY MATERIAL ON BOTTOM HALF
(THIS FILTER COVER IS RECOMMENDED FOR
ALL ROADWAY PROJECTS.)
IT IS THE PURCHASERS RESPONSIBILITY TO
PURCHASE APPROPRIATE FILTER HAT. PURCHASER
SHALL PROVIDE ROCK FOR FILTER POCKETS.
FILTER HAT INSTALLATION
FILTER HAT SLIDES DIRECTLY OVER FILTER FRAME. TO KEEP
FILTER FRAME IN PLACE OVER STORM STRUCTURE, ROCK
POCKETS ARE SEWN DIRECTLY IN TO FILTER HAT MATERIAL
EVERY FILTER HAT COMES IN ONE PIECE FOR EASY INTALLATION.
MAINTENANCE
ALL TEMPORARY EROSION, SEDIMENTATION, & POLLUTION CONTROL
PRACTICES SHOULD BE INSPECTED DAILY. CONTRACTOR SHALL
REMOVE SEDIMENT AND DISPOSE OF IN A PROPER MANNER. INSPECT
R-100A DAILY FOR CUTS, ABRASIONS, AND PROPER INSTALLATION.
REPLACE OR REPOSITION AS NECESSARY.
SPECIFICATION
FILTER FABRIC SILT-SAVER HAT SHALL BE BASED ON DESIGN
PROFESSIONAL'S SPECIFICATION.
DUE TO NARROW SLOT, A TRANSITION WILL OCCUR BETWEEN WEIR
AND ORIFICE CONDITION. ORIFICE FLOW WILL PROVIDE A MORE
CONSERVATIVE ESTIMATE OF FLOW, THEREFOR THE LESSER OF THE
ORIFICE AND WEIR FLOWS WILL BE USED FOR EACH STAGE
CALCULATION.
FILTER MATERIAL ALLOWS 129 gpm/SF OR 0.29cfs/SF
ORIFICE EQUATION (O) = Q = 0.6A(2gh)^0.5
P = FEET PERIMETER
h = HEAD IN FEET
Q = CAPACITY IN cfs
A = FREE OPEN AREA OF FRAME
g = 32.2 FEET-PER-SECOND/SECOND
3.25" SLOT WIDTH
@ WIDE END
2.0" SLOT WIDTH
@ NARROW END
61.5" DIA.
51.0" DIA.
43.0" DIA.
1.625"8.625"
5.5"
31.5" 19"
61.5" DIA.
HEAD - 3.0'
1.0'
2.5'
2.0'
1.5'
0.5'
0.0'
0
0
0
0
0
0
0.5
1.0
1.5
2.0
2.5
3.0
2.1
3.9
7.0
8.0
9.2
9.2
7
19
41
54
70
77
6
12
18
24
30
-
2
3
5
7
9
77
FRAME & FILTER DISCHARGE ANALYSIS
HEAD (FT) EQUATION
USED
OPENING
AREA (SF)
FRAME
FLOW (CFS)
FILTER
AREA (SF)
FILTERED
FLOW (CFS)
CURB INLET STORM PROTECTION B.M.P. 1.08
N.T.S.
GRAVEL
FILLED
SANDBAGS
STACKED
TIGHTLY
GRAVEL CONSTRUCTION ENTRANCE B.M.P. 1.01
CATCH BASIN/
CURB INLET
BACK OF
SIDEWALK BACK OF
CURB
FLOW
STORM INLET PROTECTION BMP 1.08
HAY BALES
ANCHOR BALES
W/ 2" X 4" (2) STAKES
PER BALE ALL AROUND
CATCH BASIN
FILTER FABRIC TO BE PLACE
UNDER CATCH BASIN GRATE
N.T.S.
EROSION
CONTROL DETAILS
Date 11 / 23 / 2025
Drawing Number
D-10181/07
Scale
Sheet
A1
Drawn by
MA
Revision #
00
Description Date
ENVIRO SOLUTIONS
CIVIL & ENVIRONMENTAL ENGINEERING
SERVICES
LARK ROAD , SIMSBURY, HARTFORD
COUNTY, CONNECTICUT

Page 18 · open in PDF

NOTES
1.  PLACE MARKER IN A PROTECTED LOCATION AT EDGE OF RIGHT-OF-WAY
2.  MAKER REQUIRED FOR ALL VALVES EXCEPT AT FIRE HYDRANTS.
LETTER "V" CAST INTO  TOP
RIGHT-OF-WAY
1'-0 (TYPICAL)
4" SQUARE CONCRETE
POST WITH 1-#4 REBAR
FINISH GRADE
ELEVATION
2'-6"2'-6"
(MINIMUM)
METER BOX
3 4" TEE
LOT
LINE
METER BOX
3 4" MIN.
SERVICE LINE
3 4" MIN.
SERVICE LINE
2" PVC CASING
SERVICE LINE
(1" MIN.)
CUTOFF
VALVE
TURN UP (APPROX.
LOCATION)
METER BOX
3 4" MIN.
SERVICE LINE
3 4" TEE
SERVICE LINE
(1" MIN.)
CUTOFF
VALVE
METER BOX
3 4" MIN.
SERVICE LINE
CORPORATION
STOP
LOT
LINE
CORPORATION
STOP
WATER MAIN
BACK OF CURB
PAVEMENT
PARKWAY
SIDEWALK
(IF APPLICABLE)
18'X18' METER
BOX & LID
24"
MIN
WATER
METER
FLARED X I.P BALL
VALVE OR PLUG TYPE
SERVICE - PLUG
OR CONNECT TO
PLUMBER LINE
WATER  MAIN
BEHIND CURB
FLARED
WATER  MAIN
IN STREET
NO COUPLING
ALLOWED UNLESS
SERVICE PIPE
EXCEED 20'
TYPE K COOPER
SERVICE LINE
WATER SERVICE INSTALLATION
" 1"OR 3" LINE
NOTE:
LOCATION OF METER BOX WITHIN PARKWAY
SHALL BE SPECIFIED BY THE CITY.
NOTE:
METER BOX AND LID INFORMATION SHALL BE
SUPPLIED BY THE CITY. SERVICE PIPE
INSTALLED LEVEL THROUGH METER BOX.
METER WILL BE SUPPLIED BY CITY.
FLARED X A.W.W.A.
TAPERED CORP. STOP
WSIVEL NUT X M.I.P.
METER COUPLINGS
CONNECTION DETAIL
PLAN
STREET
LATERAL
ON-SITE
LATERAL
FLOW
6"  SERVICE
RIGH OF WAY
FLOW
WYE
WYE
ANGULAR RISER SECTION
MIN. GRADE 1/8" PER FT
WYE
CRUSHED STONE BEDDING.
FULL WIDTH OF TRENCH
45°
MIN.
6'-0"
MIN.
DETECTION TAPE 18" TO 24"
BELOW GRADE WITH  WORDS
"CAUTION SEWR PIPE"
6" MIN. CLR. TEMPORARY
PLUG
5'-0"
MIN. R/W
DETENTION
WIRE
FINISHED
GRADE
PVC MARKER
CLASS "B" CONCRETE
3000 PSI
CLEANOUT CASTING
3'X2'X14" DEEP
FOUNDATION
INSTALL WATER
TIGHT REMOVABLE
PLUG
6" CLEANOUT STACK
CLASS "B"
CONCRETE 3000 PSI
22.5° BEND
4" MIN.
4" MIN.
CLASS "B" CONCRETE 3000 PSI
FOR GREATER THAN 10' DEPTH, USE STANDARD MANHOLE.
SECTION A-A
GRANULAR MATERIAL - SEC. 504.2.2.2
OR
FINE CRUSHED  ROCK- SEC. 504.2.2.2.(a)
FIRST JOINT FROM 22.5° BEND TO BE A
REDUCER TO 6" IF MAIN IS LARGER THAN 6"
CLEANOUT CASTING OPENING TO BE INSTALLED
CENTERED OVER THE CENTERLINE OF THE
CLEANOUT STACK EXTENDED TO GROUND LEVEL
MISCELLANEOUS
DETAIL
Date 11 / 23 / 2025
Drawing Number
D-10181/08
Scale
Sheet
A1
Drawn by
MA
Revision #
00
Description Date
ENVIRO SOLUTIONS
CIVIL & ENVIRONMENTAL ENGINEERING
SERVICES
LARK ROAD , SIMSBURY, HARTFORD
COUNTY, CONNECTICUT

Page 19 · open in PDF

Page 20 · open in PDF

Page 21 · open in PDF

Page 22 · open in PDF

Page 23 · open in PDF

Page 24 · open in PDF

Page 25 · open in PDF

Page 26 · open in PDF

Page 27 · open in PDF

Page 28 · open in PDF

Page 29 · open in PDF

Page 30 · open in PDF

Page 31 · open in PDF

  

Agenda: archived copy, SHA-256 07d3e137d6c6…. Packet: archived copy, SHA-256 0e68e10cd292….