CT Public Docs Tracker

Towns / Simsbury / Conservation Commission/Inland Wetlands and Watercourses Agency / Jul 7, 2026

Conservation Commission/Inland Wetlands and Watercourses Agency, Jul 7, 2026

Simsbury minutes posted

Documents

TypeDocumentPagesOpen
minutes Conservation Commission/Inland Wetlands and Watercourses Agency Minutes 3 PDF download · town site
agenda Conservation Commission/Inland Wetlands and Watercourses Agency Agenda 1 PDF download · town site
packet Conservation Commission/Inland Wetlands and Watercourses Agency Agenda (packet) 128 PDF download · town site

Summary

Only a meeting packet is posted. Packets (the supporting documents) are archived and searchable but not summarized; open the PDF to read it.

Full text of the documents

View the minutes PDF on this page (Conservation Commission/Inland Wetlands and Watercourses Agency Minutes) Open the PDF
Text of the minutes (Conservation Commission/Inland Wetlands and Watercourses Agency Minutes, 3 pages)

Page 1 · open in PDF

 
 
 
 
   
   
 
 
 
Page 1 of 3 
 
Conservation Commission / Inland Wetlands and Watercourses Agency 1 
Regular Meeting 2 
Ju1y 7, 2026 – 7:00 P.M. 3 
Simsbury Public Library – FSPL Room 4 
725 Hopmeadow Street, Simsbury, CT 06070 5 
 6 
MINUTES 7 
 8 
I. CALL TO ORDER – Chair Winters called the meeting 7:00 P.M.  9 
 10 
Present: Chair, Margery Winters; Vice Chair, Jason Levy; Secretary, Joseph Campolieta; 11 
Commission Members: Jason Berman and Donald Eaton. Alternate Commission Member, 12 
Sue Brittell; Planning Director, George McGregor; and Assistant  Town Planner, Brittany 13 
MacGilpin.  14 
 15 
Absent: Commission Members: Charles Haldeman and Michael Luzietti; and Alternate 16 
Commission Member, Alison Wilcox.  17 
 18 
Seating of Alternate: Commissioner Brittell was appointed as a regular for tonight’s 19 
meeting.  20 
 21 
II. APPROVAL OF MINUTES 22 
 23 
June 9, 2026, Regular Meeting and June 16, 2026, Regular Meeting 24 
 25 
MOTION: Secretary Campolieta  made a motion, seconded by Vice Chair Levy, to 26 
approve the Minutes of the June 9, 2026, Regular Meeting and June 16, 2026, Regular 27 
Meeting as written. The motion carried unanimously (6-0-0). 28 
 29 
III. NEW IWWA APPLICATIONS FOR RECEIPT AND DETERMINATION OF 30 
SIGNIFICANCE 31 
 32 
None.  33 
 34 
IV. IWWA APPLICATIONS 35 
 36 
Application CC #26-09 of the Simsbury Fire District, owner, Matthew Pearce, applicant, 37 
for the demolition of the existing fire training building and the construction of a new 70’ x 38 

Page 2 · open in PDF

Page 2 of 3 
 
20’ building in approximately the same location with associated improvement of existing 39 
paved area at 251 Hopmeadow Street (Assessor’s Map F16, Block 116, Lot 003C) 40 
Simsbury, CT 06070, Zone R-40. (Item determined non-significant on June 16, 2026).  41 
 42 
Assistant Town Planner MacGilpin, and Mr. Pearce presented the proposed demolition and 43 
construction. The Commission asked several follow-up questions and gave 44 
recommendations.  45 
 46 
MOTION: Secretary Campolieta made a motion, seconded by Vice Chair Levy, that 47 
Moved, the Inland Wetlands and Watercourses Commission APPROVES Application CC 48 
#26-09 of the Simsbury Fire District, owner, Matthew Pearce, applicant, for the demolition 49 
of the existing fire training building and the construction of a new 70’ x 20’ building in 50 
approximately the same location with associated improvement of existing paved area at 51 
251 Hopmeadow Street (Assessor’s Map F16, Block 116, Lot 003C) Simsbury, CT 06070, 52 
Zone R-40., based upon the following findings: 53 
 54 
a. The project as proposed will not have a significant impact to the wetland soils or 55 
watercourse.  56 
 57 
b. Soil and Erosion Control Measures will be installed to reduce the impact to the  58 
wetlands or watercourse during construction.  59 
 60 
And subject to the following conditions:  61 
 62 
1. The project shall be developed in substantial conformance with the application  63 
information for 251 Hopmeadow Street, dated 05-29-2026.  64 
 65 
2. At all times during site work and until soil areas are stabilized, the applicant shall install 66 
and maintain erosion and sediment control measures depicted in the application or 67 
other measures deemed necessary by the Commission’s agent to prevent erosion and 68 
sedimentation impacts to the watercourse. 69 
 70 
3. All erosion control and soil stabilization measures shall comply with the approved 71 
plans and the guidelines as established in the Connecticut Guidelines for Soil Erosion 72 
and Sediment Control, 2002, CTDEP Bulletin 34.  73 
 74 
4. Upon direction of the Commission’s agent, erosion and sediment control measures  75 
shall be removed by the applicant following stabilization of the site.  76 
 77 
5. The Inland Wetlands Agent shall be notified at least 48 hours prior to commencement 78 
of activities. 79 
 80 
The motion carried unanimously (6-0-0). 81 
 82 

Page 3 · open in PDF

Page 3 of 3 
 
Application CC #26-02 of SL Simsbury, LLC applicant and owner, for a wetland permit 83 
to construct +/ -689 residential units with associated improvements that includes 84 
disturbance in the upland review area at 200 Hopmeadow Street (Hartford South) 85 
(Assessor’s Map F17, Block 154, Lot 009-2) Simsbury, CT 06089, Zone HS-FBC. (Public 86 
hearing for this item was closed at the June 9, 2026 meeting.) 87 
 88 
The Commission discussed concerns about vernal pools, wildlife, spill lighting, and offsite 89 
impacts. 90 
 91 
Assistant Town Planner MacGilpin will write a letter of denial with the conditions 92 
discussed, have the Town Attorney review it, and bring it back to the Commission to vote 93 
on. The Commission will have a Special Meeting before July 14th.  94 
 95 
MOTION: Vice Chair Levy made a motion, seconded by Secretary Campolieta, to direct 96 
staff to draft a letter of  denial to be voted on at a Special Meeting, date to be determined. 97 
The motion carried unanimously (6-0-0). 98 
 99 
V. CONSERVATION COMMISSION BUSINESS 100 
 101 
Vice Chair Levy recommended having a discussion concerning the Town continuing to 102 
implement rodenticide regulation.  103 
 104 
VI. DESIGNATED AGENT ACTIONS AND OTHER REPORTS 105 
 106 
Chair Winters reminded the Commission to complete their training by December 31st.  107 
 108 
VII. ADJOURNMENT  109 
 110 
MOTION: Vice Chair Levy made a motion, seconded by Secretary Campolieta, to adjourn 111 
the meeting. The motion carried unanimously (6-0-0). 112 
 113 
Chair Winters adjourned the meeting at 7:45 P.M. 114 
 115 
Respectfully submitted,  116 
 117 
Amanda Blaze 118 
Commission Clerk 119 
View the agenda PDF on this page (Conservation Commission/Inland Wetlands and Watercourses Agency Agenda) Open the PDF
Text of the agenda (Conservation Commission/Inland Wetlands and Watercourses Agency Agenda, 1 page)

Page 1 · open in PDF

CC/IWWA 7/7/2026 Agenda
7-7-26 AGENDA.PDF
CC 26-09 251 Hopmeadow Street
CC 26-09 251 HOPMEADOW ST - REDACTED APPLICATION PACKET.PDF
CC 26-09 251 HOPMEADOW STAFF REPORT.PDF
CC 26-02 200 Hopmeadow Street
To view the rest of the materials for this application, please visit the June 9th Meeting 
agenda:
HTTPS://WWW.SIMSBURY-
CT.GOV/AGENDACENTER/VIEWFILE/AGENDA/_06092026-1347?HTML=TRUE
CC 26-02 200 HOPMEADOW COMBINED PUBLIC COMMENTS THRU 6-9-
26.PDF
1.
Documents:
2.
Documents:
3.
Documents:
View the packet PDF on this page (Conservation Commission/Inland Wetlands and Watercourses Agency Agenda (packet)) Open the PDF
Text of the packet (Conservation Commission/Inland Wetlands and Watercourses Agency Agenda (packet), 128 pages)

Page 1 · open in PDF

CC/IWWA 7/7/2026 Agenda
7-7-26 AGENDA.PDF
CC 26-09 251 Hopmeadow Street
CC 26-09 251 HOPMEADOW ST - REDACTED APPLICATION PACKET.PDF
CC 26-09 251 HOPMEADOW STAFF REPORT.PDF
CC 26-02 200 Hopmeadow Street
To view the rest of the materials for this application, please visit the June 9th Meeting 
agenda:
HTTPS://WWW.SIMSBURY-
CT.GOV/AGENDACENTER/VIEWFILE/AGENDA/_06092026-1347?HTML=TRUE
CC 26-02 200 HOPMEADOW COMBINED PUBLIC COMMENTS THRU 6-9-
26.PDF
1.
Documents:
2.
Documents:
3.
Documents:

Page 2 · open in PDF

 
 
 
 
   
   
 
 
 
Page 1 of 2 
 
Conservation Commission/Inland Wetlands and Watercourses Agency 
Regular Meeting  
Tuesday, July 7, 2026, at 7:00 PM 
FSPL Room, Simsbury Public Library 
725 Hopmeadow Street, Simsbury, CT, 06070 
 
AGENDA 
 
I.  CALL TO ORDER & ROLL CALL 
 
II.  SEATING OF ALTERNATES 
 
III.  APPROVAL OF MINUTES 
 June 9, 2026 
 June 16, 2026 
 
IV. NEW IWWA APPLICATIONS FOR RECEIPT AND 
DETERMINATION OF SIGNIFICANCE  
 None 
 
V.  IWWA APPLICATION(S) 
 Application CC #26-09 of the Simsbury Fire District, owner, 
Matthew Pearce, applicant, for the demolition of the existing fire 
training building and the construction of a new 70’ x 20’ building in 
approximately the same location with associated improvement of 
existing paved area at 251 Hopmeadow Street (Assessor’s Map F16, 
Block 116, Lot 003C) Simsbury, CT 06070, Zone R-40. (Item 
determined non-significant on June 16, 2026). 
 
 Application CC #26-02 of SL Simsbury, LLC applicant and owner, 
for a wetland permit to construct +/-689 residential units with 
associated improvements that includes disturbance in the upland 
review area at 200 Hopmeadow Street (Hartford South) (Assessor’s 
Map F17, Block 154, Lot 009-2) Simsbury, CT 06089, Zone HS-FBC.   
(Public hearing for this item was closed at the June 9, 2026 
meeting.) 
 
 

Page 3 · open in PDF

Page 2 of 2 
 
 
 
VI. CONSERVATION COMMISSION BUSINESS 
 
VII.  DESIGNATED AGENT ACTIONS AND OTHER REPORTS 
 
VIII.  ADJOURNMENT 
 
To view application materials: https://www.simsbury-ct.gov/conservation-
commission-inland-wetlands-agency  

Page 4 · open in PDF

Page 5 · open in PDF

Page 6 · open in PDF

Page 7 · open in PDF

Page 8 · open in PDF

Page 9 · open in PDF

Page 10 · open in PDF

Page 11 · open in PDF

Page 12 · open in PDF

Page 13 · open in PDF

Page 14 · open in PDF

Page 15 · open in PDF

Page 16 · open in PDF

Page 17 · open in PDF

Page 18 · open in PDF

Page 19 · open in PDF

Page 20 · open in PDF

Page 21 · open in PDF

Previous Proposal

Page 22 · open in PDF

rev. 1/2022 pdf 
79 Elm Street • Hartford, CT 06106-5127   www.ct.gov/deep          Affirmative Action/Equal Opportunity Employer 
Statewide Inland Wetlands & Watercourses Activity Reporting Form 
Please complete this form in accordance with the instructions on pages 2 and 3 and mail to: 
DEEP Land & Water Resources Division, Inland Wetlands Management Program, 79 Elm Street, 3rd Floor, Hartford, CT 06106
Incomplete or incomprehensible forms will be mailed back to the inland wetlands agency. 
PART I:   Must Be Completed By The Inland Wetlands Agency 
1.DATE ACTION WAS TAKEN:     year:  ______________ month:  ______________
2. ACTION TAKEN (see instructions - one code only):   ______________
3.WAS A PUBLIC HEARING HELD (check one)?     yes  no  
4. NAME OF AGENCY OFFICIAL VERIFYING AND COMPLETING THIS FORM:
(print name) (signature)    ________________________________________________ 
PART II:  To Be Completed By The Inland Wetlands Agency Or The Applicant 
5. TOWN IN WHICH THE ACTIVITY IS OCCURRING (print name):  _____________________________________________________
does this pr
oject cross municipal boundaries (check one)?       yes  no
if 
yes, list the other town(s) in which the activity is occurring (print name(s)):   ____________________,  ______________________
6. LOCATION (see instructions for information):   USGS q
uad name:  _______________________________  or number:  __________
subregional drainage basin number:  _______________________
7.
8.
9. ACTIVITY PURPOSE CODE (see instructions - one code only):    ___________
10. ACTIVITY TYPE 
CODE(S) (see instructions for codes):    __________,    __________,    __________,    __________
11. WETLAND / WATERCOURSE AREA ALTERED (see instructions for explanation, must provide acres or linear feet):
12.UPLAND AREA ALTERED (must provide acres):   ____________ acres
13.AREA OF WETLANDS / WATERCOURSES RESTORED, ENHANCED OR CREATED (must provide acres):    ____________ acres
 DATE RECEIVED:   PART III:  To Be Completed By The DEEP   DATE RETURNED TO DEEP: 
 FORM COMPLETED:   YES    NO    FORM CORRECTED / COMPLETED:   YES   NO 
GIS CODE #:  ____   ____   ____   ____   ____   ____   ____   ____   ____ 
For DEEP Use Only 
NAME OF APPLICANT, VIOLATOR OR PETITIONER (print name):  __________________________________________________
NAME & ADDRESS OF ACTIVITY / PROJECT SITE (print information):  ________________________________________________
briefly describe the ac
tion/project/activity (check and print information):  temporary         permanent            description: ____________
_____________________________________________________________________________________________
__________________________
wetlands:   ____________ acres     open water body:   ____________ acres                stream:   ____________ linear feet

Page 23 · open in PDF

Town of Simsbury 
 
933 HOPMEADOW STREET  SIMSBURY, CONNECTICUT 06070 
 
                      Department of Community Planning and Development 
 
Telephone  (860) 658-3245 
Facsimile (860) 658-3206 
An Equal Opportunity Employer  
www.simsbury-ct.gov 
 
8:30 – 7:00 Monday  
8:30 – 4:30  Tuesday through Thursday 
8:30 – 1:00 Friday  
 
To:  Conservation Commission/Inland Wetlands and Watercourses Commission 
 
From: Brittany MacGilpin, Assistant Town Planner 
 
Date:  July 7, 2026 
 
RE: CC #26-09, 251 Hopmeadow Street (Simsbury Fire District)   
 
Summary of Request: Simsbury Fire 
District, Applicant and owner, has 
submitted a wetland permit application for 
the demolition of the existing fire training 
building and construction of a new 
building in the same vicinity, 
approximately 70-feet x 20-feet.  Please 
see the location of the structures on the 
map to the right, which also shows the 
Town’s mapped inland wetlands and 
watercourses.    
 
Action by the Agency: The application 
was received by the Inland Wetlands and 
Watercourses Agency (IWWA) on June 
16, 2026.  After hearing the applicant 
present the project, the IWWA voted that 
the proposed activities were not likely to 
impact or affect wetlands or watercourses and is therefore a non-significant activity.  Because of 
this, the application does not require a public hearing but instead is expected to be voted on at the 
next regularly scheduled meeting, which is July 7, 2026. 
 
Regulated Activities: The Town of Simsbury’s Inland Wetland and Watercourses Regulations, 
Section 6.2, lists specific activities that when occurring within wetland soils or a watercourse or 
within 100 feet of these areas (AKA upland review area) are considered regulated activities and 
requires a wetland permit.  The regulated activities specific to this application include: 
 Excavating 
 Depositing or removing material 
 Earth moving 
 Construction 
 
Hopmeadow Street 

Page 24 · open in PDF

 
 
The structure is proposed in the upland review area.  The proposed building is approximately 85 
feet from the watercourse.  The existing asphalt is also proposed to be repaved in the same 
footprint. 
 
The new building will 
be a slab on-grade 
foundation.  The current 
basement foundation 
will be eliminated, 
reducing the depth of 
excavation and lowering 
risk of disrupting the 
local water table during 
construction.   
 
Once the structure is 
complete, the existing 
asphalt will be removed 
and repaved.  The 
applicant explains that 
the paving will largely 
mirror the current footprint. 
 
Existing Conditions: The larger proposed building will replace an existing building on site.  See 
the picture of the current building below.  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Previous approval for an alternative plan was granted by the IWWA in 2020, which was included 
in the application material.  That application proposed additional buildings with associated 
pavement closer to the on-site wetlands on the northern side of the property.  That 2020 plan was 
abandoned. 
 
 
 
 
 

Page 25 · open in PDF

 
 
 
 
 
At the June 16 meeting, there were questions about the vegetative buffer for the watercourse on 
site.  The pictures above show the existing conditions of this area. 
 
Soil and Erosion Measures: 
As part of the application, a 
description of what erosion 
and sedimentation control 
measures will be used to 
further protect the wetland 
soils and watercourses 
during construction was 
provided.  The applicant 
proposes to use silt fencing 
around the perimeter of the 
areas of disturbance.  Please 
see the map on the right to 
see the location of the silt 
fencing. 
 
 
 
 
 
 
 
 

Page 26 · open in PDF

 
 
 
For discussion purposes, staff offer the following findings and standard conditions of approval.  
 
Draft Motion:  Moved, the Inland Wetlands and Watercourses Commission APPROVES 
Application CC #26-09 of the Simsbury Fire District, owner, Matthew Pearce, applicant, 
for the demolition of the existing fire training building and the construction of a new 70’ x 
20’ building in approximately the same location with associated improvement of existing 
paved area at 251 Hopmeadow Street (Assessor’s Map F16, Block 116, Lot 003C) Simsbury, 
CT 06070, Zone R-40., based upon the following findings: 
 
a. The project as proposed will not have a significant impact to the wetland soils or 
watercourse. 
 
b. Soil and Erosion Control Measures will be installed to reduce the impact to the wetlands or 
watercourse during construction. 
 
And subject to the following conditions: 
1. The project shall be developed in substantial conformance with the application information 
for 251 Hopmeadow Street, dated 05-29-2026.   
  
2. At all times during site work and until soil areas are stabilized, the applicant shall install 
and maintain erosion and sediment control measures depicted in the application or other 
measures deemed necessary by the Commission’s agent to prevent erosion and 
sedimentation impacts to the watercourse. 
 
3.  All erosion control and soil stabilization measures shall comply with the approved plans 
and the guidelines as established in the Connecticut Guidelines for Soil Erosion and 
Sediment Control, 2002, CTDEP Bulletin 34.  
 
4.  Upon direction of the Commission’s agent, erosion and sediment control measures shall 
be removed by the applicant following stabilization of the site. 
 
5. The Inland Wetlands Agent shall be notified at least 48 hours prior to commencement of 
activities.  
 
Or moved, (An alternative motion) 
 

Page 27 · open in PDF

1
Macgilpin Brittany
From: noreply@civicplus.com
Sent: Wednesday, May 13, 2026 6:25 AM
To: Planning & Community Development
Subject: Online Form Submittal: Planning Department Contact Form
External sender <noreply@civicplus.com>  
Make sure you trust this sender before taking any actions.  
Planning Department Contact Form
Name Amy Zemel 
Email Address amy.e.fernald@gmail.com 
City Simsbury 
Phone Number Field not completed.
Question/Comment/Concern Please oppose The Silverman Group of NJ building 600+ units 
on wetlands. Simsbury has grown exponentially and I am in 
support of affordable housing, but this is the wrong approach. 
PLEASE oppose this. 
Email not displaying correctly? View it in your browser.
To help 
protect your 
privacy, 
Micro so ft 
Office 
prevented 
auto matic  
download of 
this picture  
from the  
Internet.

Page 28 · open in PDF

1
Macgilpin Brittany
From: Ellen Gilbert <esgbsrn@gmail.com>
Sent: Monday, April 6, 2026 4:07 PM
To: Macgilpin Brittany
Subject: Conservation Commission/ Inland Wetland Watercourses Agency
Dear Brittany and the Conservation Commission/ Wetland Watercourses Agency,
I am relieved to hear the Public Hearing for Application CC#26-02 is postponed until May 5th. My 
letter is concerning this application and though I will be away April 8-22, I will do my due 
diligence to keep up to date. SL Simsbury LLC- as applicant and owner (Silverman developer) has 
now applied for permission to build 669 residential rental units on 124.6 acres, using 8-30g to 
limit town interference. The newest site plan was described as less intrusive to the wetlands area 
and the result of water quality would improve with less impervious ground cover modified to 
become lawns. 
This letter is in preparation for the CC/IWWA Public Hearing and to encourage the board to 
consider these issues I raise. My concerns about infrastructure will wait for the Zoning Board. As a 
resident and homeowner in Talcott Acres Condo Association at 126 Hopmeadow Street, my 
conservation issues have to do with our property line shared with the property in question. 
The Hartford Insurance Company was a quiet, invisible neighbor. They limited their traffic by 
staggering work hours. Talcott Acres and Kings Ridge Apartments are existing residential 
properties that will be affected by this 669 rental development. During previous proposed plans, 
Silverman representatives described removing the modest berm we have and taking out the 
woodlands. There are beautiful old trees- not even disturbed by The Hartford. This part of 
the property was not addressed during the current proposal 
presentation. The boundary line shows no recognizable markers except a 
piece of barbed wire deeply embedded in one old tree near building #3. 
Talcott Acres needs to have a landscape barrier to provide privacy and 
preserve the rural character. Building #3 has woodlands out behind the 
building. Buildings #4 through #9 have wooded space with underbrush. 
Owners of the Building #1 and #2 have sliders and decks facing the 
property line in jeopardy. Without the woods the owners will have dense 
dwelling back yards to view.
I am told the Riverwalk Condominium complex met with the Silverman 
Group and developed an agreement concerning their property line. There 

Page 29 · open in PDF

2
are high berms, some trees were maintained and bushes planted. I will 
be receiving a Site Plan from Brittany MacGilpin to review the results of 
their agreement.
 Though the duplex homes are part of Phase 5, the agreement should be 
made during the approval process. Conservation of this strip of land is 
imperative. I ask  that the CC/IWWA place conditions on this proposal to 
meet our concerns and maintain the value of our homes and ultimately 
our investment in our owned homes.
Thank you for your commitment to Simsbury and your time dealing with 
this proposal.
Ellen S Gilbert
esgbsrn@gmail.com

Page 30 · open in PDF

Page 31 · open in PDF

Page 32 · open in PDF

1
Macgilpin Brittany
From: McGregor George
Sent: Wednesday, May 13, 2026 9:33 AM
To: Macgilpin Brittany
Subject: FW: Concerns on Silverman proposal for 200 Hopmeadow 
George K. McGregor, AICP 
Planning & Community Development Director 
Town of Simsbury 
933 Hopmeadow Street 
Simsbury, CT 06070 
P(860) 658 3252 
gmcgregor@simsbury-ct.gov
The Planning and Community Development Department has been made aware of fraudulent emails 
containing false invoices for land use applications.  If you receive a suspicious email, we urge you to contact 
us at 860-658-3252.
From: Jackie Presutti <jackie.presutti@gmail.com>  
Sent: Tuesday, May 12, 2026 8:21 PM 
To: Mackstutis Wendy <wmackstutis@simsbury-ct.gov>; Antonio Steven <santonio@simsbury-ct.gov>; Looney Curtis 
<clooney@simsbury-ct.gov>; Yeisley Diana <dyeisley@simsbury-ct.gov>; Paine Mike <mpaine@simsbury-ct.gov>; Beal 
Kevin <kbeal@simsbury-ct.gov>; McGregor George <gmcgregor@simsbury-ct.gov>; Nelson Marc 
<marcnelson@simsbury-ct.gov> 
Subject: Concerns on Silverman proposal for 200 Hopmeadow  
Dear Simsbury Board of Sele ctmen, Town Pla nner, Zoning Commissi on, an d Conservatio n Co mmissio n,   I’m writing to state my con cern s on the propose d 669 resi dential rental units by the Silverman Group at 200 H op meadow Street. I was unable t o a  
Warning: Unusual sender <jackie.presutti@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions. 
Dear Simsbury Board of Selectmen, Town Planner, Zoning Commission, and Conservation Commission,   
I’m writing to state my concerns on the proposed 669 residential rental units by the Silverman Group at 200 
Hopmeadow Street. I was unable to attend the public hearing last week for environmental concerns due to a sick child 
(and also these public hearings always happen right at bedtime making it extremely difficult for families raising the next 
generation of Simsbury’s best to attend and voice support or concern), but want to ensure the Zoning Commission sees 
my comments before the next session.  
As a Simsbury resident for 6 years, an active member of the Simsbury Land Trust during that time, an active parent to 
small kids in this community, a Sierra Club member, a wildlife conservationist, a member of the Simsbury Pollinator 

Page 33 · open in PDF

2
Pathway, and a proponent of fair, affordable and equitable housing, I have several concerns and urge you to reject this 
proposal.  
1. Why would the town knowingly award any building contract to a contractor who does not know our town or our 
people? What alternative proposals from local builders, specifically female or black owned business have been 
solicited for alternative uses or plans for this space? As tax payers, we should be supporting local business and 
local jobs with any new proposal, despite what new  
2. This land has been vacant for many years, and due to its importance along the Farmington River and adjacent 
location to Nod Brook wildlife management area, many species have now rehomed to this acreage that would 
be displaced, harmed or killed with such a massive development. The original use of this land was limited to 
office park without constant human presence, and the noise and light and garage pollution that comes with it. 
What wildlife studies have done specifically in native species that have repopulated this area since the closure of 
the commercial building years ago? What surveys have been done the negative impact on the native plants and 
pollinators species that now call this area home? Further, putting nearly 700 units directly on our waterway can 
have catastrophic impacts for our ecosystem. We should be protecting our scenic waterways in a time of climate 
crisis. Any new development plans in our town must consider first how we support the existing population- we 
are directly supported by fragile ecosystems that require deliberate stewardship. The current design appears 
thoughtless in this regard.  
3. This council rejected a similar proposal for fewer units by this same group recently. Why would it entertain 
another larger proposal by the same group that could cause such harm? 
4. Lastly, my concern is on the true fair affordability of these units. These rental units do not address the need to 
help low and middle income families build wealth and do not provide economic opportunity for advancement as 
homeownership. Nor do they serve our seniors in a time of uncertainty. They serve primarily to generate profit 
for the builder and property manager. If we are interested in truly providing affordable housing, full ownership 
or co-op style communities would be significantly more impactful. 
I must ask that the town planner George McGregor pass my comments onto the Zoning Commission for consideration.  
Thank you, 
Jackie Presutti  

Page 34 · open in PDF

1
Macgilpin Brittany
From: Beth B <bethsballentine@gmail.com>
Sent: Tuesday, May 19, 2026 11:26 AM
To: Macgilpin Brittany; mwinters@simsbury-ct.gov
Subject: COMMENT FOR TONIGHT'S MEETING: Proposed development by the Silverman Group
Warning: Unusual sender <bethsballentine@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions. 
This is Beth Ballentine of 31 Metacom Drive. I won't be in town this evening to attend the Wetlands meeting, 
but I do want to voice my biggest concern.
At the last meeting, someone asked about runoff of salt and chemicals used on roads in winter. The 
developer’s representative said they will come up with a salt management plan the Conservation Commission 
can review. My personal concern: they can say what they like in order to get Conservation Commission 
approval, but are they going to inform potential renters that they may be walking and driving on icy roads and 
sidewalks so they can stay within stated treatment limits? Or, as is more likely, are they just going to treat as 
needed, and chalk up future fines as business expenses? When I spoke with Brittany MacGilpin in the town 
planner's office, she said the only thing that could be done in that situation would be requesting DEEP to issue 
a fine. In other words, the developer could permanently damage the wetlands with little repercussion. 
Instead of the developer submitting a salt management plan, which they may or may not end 
up adhereing to in the future, I think that a much more accurate way to determine potential effects of 
salt and chemicals on the wetlands is to assume that the development will use the average amount of 
products used in the past by the town and current residents on their properties. 
Please pass my comment along to all the Wetland and Conservation committee members.
Thank you,
Beth Ballentine
860-930-3529

Page 35 · open in PDF

1
Macgilpin Brittany
From: Sara Viggiano Gildea <sara.gildea@gmail.com>
Sent: Tuesday, May 19, 2026 11:51 AM
To: Macgilpin Brittany
Subject: Concerns re proposed apartment complex
Warning: Unusual sender <sara.gildea@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions. 
Hi Ms. MacGilpin, 
I hope you can pass on my concerns below to the Wetlands/Conservation committee members.  Thank you! 
Dear Wetlands/Conservation Committee, 
As a resident of Simsbury (4 Kilbourn Farms), I am writing to express my concern about the proposed 
apartment complex for the parcel of land formerly owned by The Hartford. I am very concerned about the impact on the 
nearby wetlands and the disturbance of natural habitats. I am hoping that you will not allow this proposal to proceed as 
the potential negative impacts greatly outweigh the positives.  
Best, 
Sara Gildea 
201-788-7069 

Page 36 · open in PDF

1
Macgilpin Brittany
From: Lori Hartz <lhartz1003@aol.com>
Sent: Tuesday, May 19, 2026 12:32 PM
To: Macgilpin Brittany
Subject: Silverman project
Warning: Unusual sender <lhartz1003@aol.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions. 
Attention: Assistant Town 
Planner BrittanyMacGilpiny: 
Tyler Meeks really did the work.  669 
units is ridiculous- too many cars which 
will impact not only Simsbury, but Avon 
too.  Are they going to build another 
school for the children in this 
development?  The sewers needed, the 
impact on the wetlands, on our roads, our 
Fire Department, Police Department, 
volunteer Ambulance service, …  How 
could this company come back to our 
town with a development with over 200 
more units than the one rejected 2 years 
prior?!!!  Simsbury needs to fight this 

Page 37 · open in PDF

2
development!  We should not allow more 
than 50 residential units for any project in 
our town (and we don’t need that either)!
Thank you for your hard work in our 
town, please do the right thing. 
Sincerely, 
Lori Hartz  
31 Beldenwood Road  
Please pass this on to the 
Wetlands/Conservation committee 
members as well. 
Thank you. 

Page 38 · open in PDF

1
Macgilpin Brittany
From: Tamara Queen <queenoftheforest11@gmail.com>
Sent: Tuesday, May 19, 2026 12:26 PM
To: Macgilpin Brittany
Cc: Jerry Queen
Subject: Opposition to Proposed 670 unit Apartment Development on Hopmeadow Impacting 
Wetlands and the Environment
Warning: Unusual sender <queenoftheforest11@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions. 
May 19, 2026
Simsbury Inland Wetlands and Watercourses Commission 
Town of Simsbury 
933 Hopmeadow Street 
Simsbury, CT 06070
Subject: Opposition to Proposed 670 Unit Apartment Development on Hopmeadow St. 
Impacting Wetlands and the Environment
Dear Members of the Simsbury Inland Wetlands and Watercourses Commission, we are 
writing to express our strong opposition to the proposed apartment complex 
development at the old Hartford site that would significantly impact and destroy 
wetlands within our community.
The wetlands in Simsbury are not vacant or expendable land. They are critical natural 
resources that provide flood control, groundwater filtration, wildlife habitat, erosion 
prevention, and environmental balance for our town. Once these wetlands are 
disturbed or eliminated, the damage is permanent and cannot ever truly be restored.
Over the past decade, Simsbury has already experienced substantial development 
pressure. This proposal represents at least the fourth large apartment complex built in 
roughly ten years, and each project has contributed to the gradual loss of open space 
and sensitive environmental areas. At some point, our town must decide whether 
continued large-scale development is worth the irreversible environmental costs.
The cumulative impact of repeatedly removing wetlands cannot be ignored. Increased 
stormwater runoff, flooding risks, traffic congestion, strain on infrastructure, and loss 
of wildlife habitat all directly affect the quality of life for current residents. Wetlands 

Page 39 · open in PDF

2
serve as natural protection systems for the entire community, especially during 
increasingly severe weather events. Destroying a large portion of these wetlands for 
yet another dense development project places short-term construction interests ahead 
of the long-term environmental health and safety of Simsbury.
We respectfully urge the Commission to carefully consider not only this individual 
proposal, but also the cumulative environmental consequences of continued 
overdevelopment in our town. The Inland Wetlands and Watercourses Commission 
exists to protect these irreplaceable natural resources, particularly when they are 
under significant threat.
Simsbury’s character, environmental integrity, and resilience depend on preserving the 
natural systems that make our town unique. Once wetlands are gone, they are gone 
forever.
For these reasons, we respectfully ask the Commission to deny this application or 
require substantial revisions that fully protect the wetlands and surrounding 
ecosystem.
Thank you for your time, consideration, and service to the Town of Simsbury.
Sincerely,
Jerry and Tamara Queen 
30 Blue Ridge Dr 
Weatogue, CT 06089 
Jerry.p.queen@gmail.com

Page 40 · open in PDF

1
Macgilpin Brittany
From: Janet Hawkins <hawkinsmtn@sbcglobal.net>
Sent: Tuesday, May 19, 2026 1:10 PM
To: Macgilpin Brittany
Subject: Against proposed 670 unit development on Hopmeadow
Warning: Unusual sender <hawkinsmtn@sbcglobal.net>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions. 
Dear Brittney, 
Please state for the record we are vehemently opposed to the latest proposed development on 
Hopmeadow Street. Not only does it infringe on significant wetlands, but such a sizeable 
development would be just another burden on our town's systems. 
Stuart & Janet Hawkins 
3 Roswell Rd. 
W. Simsbury  

Page 41 · open in PDF

1
Macgilpin Brittany
From: Steve Wright <thewrightsrule@gmail.com>
Sent: Tuesday, May 19, 2026 1:41 PM
To: Macgilpin Brittany
Subject: New apartment complex on Hopmeadow
Warning: Unusual sender <thewrightsrule@gmail.com> 
You don't usually receive emails from this address. 
Make sure you trust this sender before taking any actions. 
Hello Brittany, 
As someone who has grown up and been in Simsbury for 40 + years I strongly oppose the proposal for the 670 unit 
apartment complex going in on Hopmeadow Street.  
This town has grown so much. In some ways good, some ways bad, but the loss of land makes me very sad. We have had 
so many apartment complexes go up so quickly I fear the school systems are going to be very overwhelmed as well as 
the streets. Please keep our town small, quaint & charming like I remember. 
Thank you, 
Heather Wright 
78 Seminary Road 
Sent from my iPhone 

Page 42 · open in PDF

1
Macgilpin Brittany
From: Jenifer Smolnik <smolnikj@gmail.com>
Sent: Tuesday, May 19, 2026 1:48 PM
To: Macgilpin Brittany
Subject: further development of 669 residential units in Weatogue/Simsbury
Attachments: 05-14-26_Coorespondence_to_Simsbury_defending_open_ spaces.docx
Warning: Unusual sender <smolnikj@gmail.com> 
You don't usually receive emails from this address. 
Make sure you trust this sender before taking any actions. 
Good afternoon Ms. MacGilpin - I am writing because I would like to relay to you my deep concerns about further 
development in Simsbury, especially of this size and scope.  Please let me know if you have any further questions. 
Sincerely, Jenifer Smolnik, Resident of Weatogue  

Page 43 · open in PDF

1
Macgilpin Brittany
From: ERIC BLEIMEISTER <ebleimeister@comcast.net>
Sent: Tuesday, May 19, 2026 3:41 PM
To: Macgilpin Brittany
Subject: Hopmeadow Apartment/housing complex at Old Hartford Insurance grounds
Warning: Unusual sender <ebleimeister@comcast.net>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions. 
Hello Brittany  
I have serious concerns about the size of this complex and the future  constraints and 
potential negative effect on the town's infrastructure concerning utilities, public services 
and schooling.  Also the amount of  run off this size of the community (the largest 
single development in CT?) can generate is a concern to wetlands.  
The previous submission from the Silverman group was struck down for good reason 
and now they come back with a larger development --that's nonsensical. I do not trust 
that an out of state developer has the best interest of this community in mind.       
Please list my concerns for tonight's meeting. Thank you.   
Sincerely,  
Eric Bleimeister  
11 Pheasant lane  
Weatogue   
cell: 860-466-0181  
ebleimeister@comcast.net  

Page 44 · open in PDF

Jami Lewchik
4 Flintlock Ridge
Simsbury, CT 06070
jlewchik@gmail.com
May 19, 2026
Aft: Briftany MacGilpin, Assistant Town Planner
Town of Simsbury
933 Hopmeadow Street
Simsbury, CT 06070
bmacgilpin@simsbury-ct.gov
RE: Wriften Public Comment — Applicafion CC #26-02, SL Simsbury LLC, 200 Hopmeadow Street 
("Harfford South") — Confinued Public Hearing, May 19, 2026
Dear Chair Winters and Members of the Conservafion Commission / Inland Wetlands and 
Watercourses Agency:
I am a resident of Simsbury submifting these wriften comments for the record on Applicafion CC 
#26-02. I offer these comments not in any official capacity, only as an individual with a strong 
interest in the long-term protecfion of Simsbury's wetlands, watercourses, and natural 
resources. I have reviewed the applicafion materials posted to the Town's agenda center, 
including the May 4, 2026 Third-Party Review prepared by CHA and EcoMaps, LLC, the Staff 
Report dated May 5, 2026, the applicant's site plans, the Stormwater Management Report, the 
Biological Assessment, the Wetland Delineafion and Impact Reports, the Invasive Species 
Management Plan, the alternafive site plans, and the applicant's May 15, 2026 VHB response 
comments.
My comments are organized around the areas the Commission has both the authority and the 
obligafion to evaluate under CGS §§ 22a-36 through 22a-45, the Town of Simsbury Inland 
Wetlands and Watercourses Regulafions, and the elevated standard of CGS §22a-41(b)(1) — 
which applies here because the Commission unanimously classified this applicafion as a 
"significant acfivity" triggering a mandatory public hearing. Under that standard, a permit shall 
not be issued unless the Commission finds on the record that no feasible and prudent 

Page 45 · open in PDF

alternafive exists. The burden of making that showing rests with the applicant. Based on my 
review of the record, I respecffully submit that that burden has not yet been met.
I. THE ALTERNATIVES ANALYSIS IS LEGALLY INSUFFICIENT
The Third-Party Reviewers (CHA/EcoMaps, Comment No. 33) found that the applicant's 
alternafives analysis — while improved from its original single "no-build" scenario — sfill fails to 
safisfy the statutory requirement. The three alternafives evaluated are: (1) no-
build/abandonment; (2) maintaining the exisfing impervious footprint without any URA 
disturbance; and (3) the CP-2 configurafion, which would actually increase URA impacts. 
Crifically, the analysis does not evaluate:
  - Alternafive roadway alignments or configurafions for the two secfions of road proposed 
within the URA adjacent to Wetland 1 (the Minister Brook corridor) and Wetland 6 — the 
primary direct disturbance areas;
  - Alternafive stormwater outlet configurafions that could eliminate the need for the proposed 
new outlet pipe within the URA to Wetland 1; or
  - Reducfions in building footprint, unit count, or parking layout that could contract the limit of 
disturbance near regulated resource areas, parficularly proximal to the vernal pool complex.
The Town's own Third-Party Reviewers concluded: "The Applicant should provide a more 
complete alternafives analysis demonstrafing that no feasible and prudent alternafive exists for 
each proposed acfivity within the upland review area, consistent with the requirements of CGS 
§22a-42a." I urge the Commission to adopt this finding and require a complete, element-by-
element alternafives analysis before closing the hearing or rendering any decision.
II. STORMWATER MANAGEMENT: MULTIPLE UNRESOLVED DEFICIENCIES
The Third-Party Review idenfified no fewer than seventeen mandatory correcfions ("must 
revise," "must provide," "must review and revise") to the stormwater design. These are not 
minor comments. They include:
1. Impervious area classificafion (Comment No. 2): The Stormwater Report claims the site 
qualifies as "redevelopment" under the CT Stormwater Quality Manual because it exceeds 40% 
impervious area, which reduces the required water quality retenfion volume from 100% to 50%. 
CHA found that the exisfing impervious area may be below 40%, which would double the 
required retenfion volume. The applicant must provide documentafion to support this threshold 

Page 46 · open in PDF

classificafion. Unfil it does, the stormwater calculafions may be based on an incorrect, less 
protecfive standard.
2. Missing water quality units (Comment No. 4): Infiltrafion systems 2G and 6C are missing the 
water quality treatment units that the report itself says are required for all stormwater entering 
a closed drainage system. A considerable porfion of the access road network also lacks pre-
discharge water quality treatment.
3. Outlet control structure details missing (Comment No. 5): Site plans lack details and complete 
inverts for the outlet control structures that will meter stormwater from the infiltrafion basins. 
CHA stated this informafion is required to allow a "complete review" of the stormwater 
calculafions — meaning the stormwater system as submifted cannot be fully evaluated.
4. Mismatched elevafions throughout the plan set (Comments Nos. 6, 10, 15): Outlet invert 
elevafions for infiltrafion basins 1C, 2A, 2F, 2G, 2J, 6C, and 7B on the site plan do not match the 
drainage calculafions. Boftom-of-stone elevafions for basins 1C, 2D, 2F, 2G, 3A, 5C, 6C, and 7B 
are likewise inconsistent. These internal inconsistencies make independent verificafion of the 
stormwater calculafions impossible.
5. Freeboard deficiency (Comment No. 7): Above-ground infiltrafion basin 4P has only 0.2 feet 
of freeboard during the 100-year storm. The CT Stormwater Quality Manual requires 0.5 feet. 
As designed, this basin would be overtopped in a 100-year event, discharging uncontrolled 
stormwater toward wetlands.
6. Missing soil test pits (Comment No. 16): Required soil test pits have not been provided for 
infiltrafion basins 3A, 4A, and 6C. Without confirmed soil infiltrafion capacity at these specific 
locafions, there is no basis for concluding the infiltrafion systems will perform as designed.
7. Wetland hydrology impact unaddressed (Comment No. 24): This is the most consequenfial 
finding in the Third-Party Review. CHA found that the Stormwater Report does not evaluate: (a) 
how the proposed reducfion in discharge at Design Points DP2-5 and DP2-7 — which currently 
discharge directly to on-site wetlands — will affect the hydrology of those receiving wetlands; 
(b) how the shift from surface runoff to subsurface infiltrafion will affect groundwater recharge 
and hydroperiod in depressional wetlands currently sustained, at least in part, by stormwater; 
or (c) what proporfion of exisfing hydrologic inputs to each wetland system is aftributable to 
stormwater versus natural sources. CHA's conclusion: "the conclusion that no adverse impacts 
to wetland hydrology are anficipated is not substanfiated."

Page 47 · open in PDF

This last finding goes to the heart of the Commission's mandate. Wetlands 2, 4, 5, 6, and 7 are 
depressional systems that the applicant's own delineafion report idenfifies as shaped largely by 
exisfing stormwater discharge. The Commission cannot make a finding of no adverse wetland 
impact if the applicant has not demonstrated what will happen to those wetlands' water supply 
when the current stormwater regime is fundamentally altered. I urge the Commission to require 
a complete hydrologic analysis of each individual wetland system before this hearing closes.
III. VERNAL POOL HABITAT: INADEQUATE BIOLOGICAL ASSESSMENT AND PROTECTION 
MEASURES
The site contains confirmed vernal pool habitats in Wetlands 2, 4, 5, and 6, associated with 
wetland-obligate amphibians. The Third-Party Review (Comment No. 25) found that:
  - The applicafion materials do not provide a quanfitafive assessment of proposed disturbance 
relafive to the Crifical Terrestrial Habitat (CTH — 750-foot buffer) and the Vernal Pool Envelope 
(VPE — 100-foot buffer);
  - VHB's response to the Town Planner's specific March 10 request for informafion on reduced 
construcfion within the 750-foot buffer was non-responsive, stafing only that "vernal pool 
protecfion measures were agreed upon with NDDB" — which the Third-Party Reviewer correctly 
noted does not subsfitute for the Commission's independent evaluafion under the Simsbury 
Inland Wetlands and Watercourses Regulafions;
  - The biological assessment recommends further surveys during opfimal condifions (March 
through June) to rule out the presence of certain vernal pool species — those surveys have not 
been completed, meaning the Commission is being asked to decide on an applicafion whose 
biological baseline is acknowledged to be incomplete; and
  - Construcfion-phase impacts — including direct mortality of amphibians during seasonal 
migrafion, fragmentafion of movement corridors, and sedimentafion of egg masses — are not 
addressed by specific, enforceable construcfion-phase protecfion measures.
I ask the Commission to require complefion of opfimal-season vernal pool surveys before the 
hearing closes, and to require the eight specific protecfive measures idenfified by CHA/EcoMaps 
in Comment No. 25 as mandatory permit condifions.
IV. CONSTRUCTION PHASING: CUMULATIVE IMPACT UNCONFIRMED

Page 48 · open in PDF

The Third-Party Review (Comment No. 36) idenfifies a crifical gap: the submifted materials do 
not provide sufficient informafion to confirm that cumulafive disturbance within the URA, CTH, 
and VPE has been fully accounted for across all six construcfion phases combined. The Review 
requests confirmafion that the 3.76-acre URA disturbance figure cited in the Wetland Impact 
Assessment represents the total for all phases, not just Phase 1. Mulfi-phase construcfion in 
sensifive habitat areas poses parficular risks to vernal pool species during each successive 
phase, including during periods of inacfivity between phases when sediment and erosion 
controls may be inadequately maintained.
V. POST-CONSTRUCTION MONITORING: NO ENFORCEABLE MECHANISM
The applicafion proposes extensive nafive planfings within the URA, VPE, and CTH as the 
primary mifigafion measure. Yet no post-construcfion monitoring plan and no planfing success 
criteria have been submifted (Third-Party Review, Comment No. 35). Without defined 
performance thresholds and a structured monitoring program, there is no legal mechanism by 
which the Commission can evaluate whether the proposed habitat enhancements are actually 
achieved, or compel correcfive acfion if planfings fail. Any permit should require a monitoring 
plan with: percent survival and cover thresholds at years 1, 3, and 5; semi-annual inspecfions by 
a qualified wetland scienfist for at least three years; correcfive acfion protocols; invasive species 
monitoring; and a final compliance cerfificafion prior to release of any performance bond.
VI. ADDITIONAL CONCERNS
Dewatering: No informafion has been provided regarding the management of dewatering 
discharge during ufility installafion or excavafion, parficularly in areas proximal to wetlands 
(Third-Party Review, Comment No. 34).
Arfificial Lighfing: The photometric plan does not clearly demonstrate that light spill at wetland 
boundaries, parficularly adjacent to the vernal pool complex (Wetlands 2, 4, 5, 6), approaches 
0.0–0.1 footcandles. Arfificial lighfing is a documented disruptor of amphibian migrafion and 
breeding behavior (Third-Party Review, Comment No. 31).
Synthefic Erosion Control Materials: The use of welded plasfic or "photodegradable" erosion 
control mafting within the URA and CTH poses documented wildlife entrapment risks. Only 
natural biodegradable materials (jute, coir, cofton) should be permifted proximal to wetlands 
(Third-Party Review, Comment No. 26).

Page 49 · open in PDF

Invasive Species Management Plan: The submifted ISMP lacks defined limits of management, 
treatment schedule, measurable success criteria, and an adapfive management component 
(Third-Party Review, Comment No. 30). An inadequately monitored ISMP within the VPE and 
CTH can cause repeated disturbance that undermines the habitat the applicafion claims to 
protect.
VII. REQUEST FOR RELIEF
Based on the foregoing, I respecffully request that the Commission:
1. Not close the public hearing unfil the applicant has provided complete responses to all 
mandatory items idenfified in the Third-Party Review, and the Third-Party Reviewer has 
confirmed in wrifing that those responses are safisfactory;
2. Require the complefion of opfimal-season vernal pool surveys (spring, March–June) and 
submission of results before the hearing is closed;
3. Require a complete, element-by-element feasible and prudent alternafives analysis as 
specified in Third-Party Review Comment No. 33 and CGS §22a-42a, specifically addressing 
roadway alignment alternafives, stormwater outlet alternafives, and reduced-footprint design 
opfions for each area of proposed URA disturbance; and
4. Make express findings under CGS §22a-42a regarding the absence of feasible and prudent 
alternafives for each specific regulated acfivity proposed within the upland review area, prior to 
rendering any decision.
Thank you for your considerafion of these comments and for your confinued dedicafion to 
protecfing Simsbury's wetlands and natural resources.
Respecffully submifted,
Jami Lewchik
4 Flintlock Ridge
Simsbury, CT 06070
jlewchik@gmail.com
617-872-9219

Page 50 · open in PDF

1
Macgilpin Brittany
From: Diane G. Nash <dianegnash@gmail.com>
Sent: Tuesday, May 19, 2026 3:37 PM
To: Macgilpin Brittany
Subject: Public hearing statement
Warning: Unusual sender <dianegnash@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions. 
Diane Nash 
5 Merrywood 
Simsbury, CT 06070 
When 8-30G was enacted with the lofty purpose of creating more opportunity for housing to the less affluent, it 
was not meant to be used as a weapon to provide wealth to developers, while destroying resources that are 
needed and beneficial to all. 
This application is a blatant example of just that. 
While FEMA is expanding the 100 year flood plain and adding more information to update risks due to climate 
science research, and just now, homeowners flood insurance premiums have increased due to that increased 
risk, many now are suddenly aware of how fragile is our environment and our need for it’s protection. 
That in itself would be substantial reason for this application to be denied. 
Floodplain and wetlands, …with storm sewers and catch basins to mitigate harm , should not be tested, 
considered or negotiated. 
First  
Do no harm 
Reject this application 

Page 51 · open in PDF

1
Macgilpin Brittany
From: vmarecki@comcast.net
Sent: Tuesday, May 19, 2026 1:53 PM
To: Macgilpin Brittany
Cc: Gina Marecki
Subject: Proposed 670 Unit Complex
Warning: Unusual sender <vmarecki@comcast.net>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions. 
Good afternoon Brittany, 
I apologize, but I am unable to make the meeting about the proposed complex on the old Hartford 
property. I am a 62-year resident of Simsbury (my family has been here for over 100 years), owned 
several commercial properties and own a recruiting business in Simsbury. We raised three children 
and put them all through the Simsbury school system. My eldest daughter Alexandra is a Special 
Needs Teacher at Squadron Line School. Needless to say, we love this town and all that it provides. 
Our family’s sentiment is that we all love the town because of its quaintness, the landscaping, the 
school system, the services, the lack of chain stores and drive thru’ s and the ability to walk and 
drive around town without the bustle of the big town. Look at Glastonbury’s rapid growth. They 
now have major traffic problems and roundabouts everywhere. We do not want that in Simsbury! I 
question the impact on traffic. It is already nearly impossible to get onto Hopmeadow Street 
because there is so much more traffic. 
I was on the Zoning Commission for many years and oversaw many mixed-use proposals. The one 
thing I stressed at these meetings is that these developments are great for the residential portion, 
but non-compliant or fall short on the commercial and retail components. I do not think flooding 
the town with condominiums is in our best interest. We really have a lot as it stands and through 
all this development, not much retail development for the residents to utilize, at least at the other 
multi use sites. From a homeownership standpoint, society keeps telling our kids that the new 
generation will never be homeowners. If we keep letting developers construct massive condo 
rentals, especially of this magnitude, this will probably be true. (My daughter, on a teacher’s 
salary, pays over $2000/mo., not building any equity!) Aside from that, I worry about the strain on 
our public school system. Whatever the developers’ experts say about the number increase of 
school age children, it’s typically a lie. They ALWAYS underestimate the impact on our school 
infrastructure. My daughter who is a teacher, sees the strain, especially, because people move 
here to get access to our special needs programs as they bare best in state. If this is approved and 
does put a strain on our school system, what will redistricting look like? Will kids spend more time 
on buses than they should? Get up even earlier to catch buses? 
Brittany, thank you for your time and consideration. I think you know how I feel about any further 
condo growth  in our town. I ask this question: “Why do we need 670 more condo units?” What is 
the benefit? Who benefits? How will this help homeownership for our young residents? What will the 
impact be on our infrastructure and especially our school system? And who is going to pay the 
price? Us, the taxpayer and we can’t keep putting the burden on the taxpayer over and over again.
Best, 

Page 52 · open in PDF

2
Vaughan 
Vaughan A. Marecki 
26 Lucy Way | Simsbury, CT 06070 
c: 860.280.4195 

Page 53 · open in PDF

1
Macgilpin Brittany
From: ALDONA <aldonat@comcast.net>
Sent: Tuesday, May 19, 2026 1:57 PM
To: Macgilpin Brittany
Subject: Opposition to proposed 670 unit apartment complex on Hopmeadow St.
Warning: Unusual sender <aldonat@comcast.net>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions. 
From:  
Aldona Tarlowski  
38 Ichabod Rd.  
Simsbury, CT  06070  
AldonaT@comcast.net
860-559-4843  
To:  
Brittany MacGilpin  
Office of the Town Planner  
Town of Simsbury  
933 Hopmeadow Street  
Simsbury, CT 06070  
Re: Formal Objection to Proposed Development Affecting Wetlands
Dear Ms. MacGilpin,  
Since I am not able to attend tonight's meeting, I am writing to express my strong concern and formal 
objection to the proposed development project planned for the area adjacent to our local wetlands. As 
a resident of Simsbury who values responsible growth, environmental stewardship, and the long-term 
health of our community, I believe this project poses significant risks that must be carefully 
reconsidered.  
Wetlands are among the most sensitive and ecologically valuable resources in our town. They 
provide essential flood mitigation, groundwater recharge, wildlife habitat, and natural filtration that 
protects water quality. Any large-scale development in or near these areas threatens to disrupt these 
functions—often irreversibly.  
My concerns include, but are not limited to:  
 Hydrological Impact: Increased impervious surfaces will alter natural drainage patterns, 
potentially increasing flooding downstream and degrading water quality.  
 Habitat Loss: The wetlands and surrounding buffer zones support diverse plant and animal 
species. Disturbance or encroachment could fragment or eliminate critical habitat.  

Page 54 · open in PDF

2
 Stormwater Management Risks: Even with engineered systems, stormwater controls 
frequently fail or underperform over time, especially during extreme weather events that are 
becoming more common.  
 Long-Term Community Costs: Once wetlands are compromised, the town often bears the 
financial burden of remediation, infrastructure strain, and flood-related damage.  
 Inconsistency with Conservation Goals: Simsbury has a long history of valuing open space 
and environmental protection. Approving a project of this scale in such a sensitive area would 
run counter to those commitments.  
I have been alarmed by the number of multi-complex developments in our town being built along the 
Farmington River.  I'm even more concerned by the number of accompanied self-storage facilities 
that are being erected, usually as sad eyesores in close proximity to these new developments.  My 
hope is that the town of Simsbury remains a picturesque suburb town known for protected wetlands, 
green spaces and a peaceful way of life.  This development and the repercussions that would follow it 
are NOT the way for the town of Simsbury and NOT in the best interest of its residents.  
I respectfully request that the Town Planning Office require a comprehensive environmental impact 
assessment, including an independent wetlands delineation and hydrological study. I also urge the 
Planning Commission to consider alternative locations or scaled-down designs that do not jeopardize 
protected natural resources.  
Our wetlands are not replaceable. Once they are filled, drained, or degraded, the damage cannot be 
undone. I ask that the town uphold its responsibility to safeguard these critical ecosystems for current 
residents and future generations.  
Thank you for your attention to this matter. I would appreciate being kept informed of all hearings, 
meetings, and opportunities for public comment related to this project.  
Sincerely,  
Aldona Tarlowski  

Page 55 · open in PDF

1
Macgilpin Brittany
From: Elizabeth Angus <eangus48@icloud.com>
Sent: Tuesday, May 19, 2026 3:06 PM
To: Macgilpin Brittany
Subject: Proposed 670 unit complex on Hopmeadow St
Warning: Unusual sender <eangus48@icloud.com> 
You don't usually receive emails from this address. 
Make sure you trust this sender before taking any actions. 
Ms. MacGilpin, 
As a resident of Simsbury (20 Red Stone Drive), I am writing to express my strong opposition to the proposed 
development on Hopmeadow.  This project is oversized and seems to benefit only the construction company proposing 
it.  The proposed site contains wetlands and its preserving vital to support protected species that reside there.  I implore 
you and your committee to reject this proposal and to work with theSimsbury  community to develop more appropriate 
options for this site.  Thank you, 
Elizabeth Angus 
Sent from my iPad 

Page 56 · open in PDF

1
Macgilpin Brittany
From: Victor <vsuski@gmail.com>
Sent: Tuesday, May 19, 2026 3:03 PM
To: Macgilpin Brittany
Subject: Public Comment for the Record, Application CC #26-02, May 19, 2026 Hearing
Warning: Unusual sender <vsuski@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions. 
Assistant Town Planner MacGilpin, 
Please enter this comment into the record of Application CC #26-02 and forward it to the Commission in advance of 
tonight's hearing. 
I write to flag two points within §22a-41 jurisdiction that may not have been squarely addressed in the application or 
independent review. 
1. NDDB screening for listed species and critical habitat. DEEP's Natural Diversity Data Base map places the parcel 
within a hatched State and Federal Listed Species area, with Critical Habitat designations on both Minister Brook and the 
adjacent Farmington River corridor. The map's own instructions direct projects within hatched areas to submit a Request 
for Natural Diversity Data Base State Listed Species Review via DEEP ezFile. The record should reflect whether such a 
Review was submitted, what DEEP determined, and how that determination informs the §22a-41(a)(6) analysis of 
impacts on watercourses outside the immediate site.
The pollutant and hydraulic loading profile of 669 residential units differs materially from the prior office use, regardless 
of footprint overlap.   
2. Stormwater design against historical precipitation data. The applicant's stormwater design is presumably calibrated 
to the DEEP Stormwater Manual and NOAA Atlas 14 precipitation data. DEEP and the Northeast Regional Climate Center 
have both acknowledged that Atlas 14 reflects historical precipitation (the most recent update uses 2012 data) and does 
not account for documented increases in heavy-storm frequency and intensity. Section 22a-41(a)(3) requires the 
Commission to evaluate long-term wetland productivity, not short-term design-manual compliance. The record should 
reflect how the proposed stormwater system performs under forward-looking precipitation projections over the 
project's 40-year affordability-restriction horizon. 
Respectfully, 
Victor Suski 
18 Birch Rd, West Simsbury, CT 

Page 57 · open in PDF

1
Macgilpin Brittany
From: Mona Lou Kelly <monaloukelly@gmail.com>
Sent: Tuesday, May 19, 2026 3:27 PM
To: Macgilpin Brittany
Subject: Proposed 670 unit apartment complex proposal
Warning: Unusual sender <monaloukelly@gmail.com> 
You don't usually receive emails from this address. 
Make sure you trust this sender before taking any actions. 
Hello-I am writing with regards to the above mentioned proposal to the attention of the Wetlands/Conservation 
committee members. Thank you to Beth Bally for the post. 
I do not have a problem with the concept of adding housing, just not such a huge add by investors from out of state 
looking for a money grab. I understand this is an initial hearing to determine the risk to the neighboring area. 
It is obvious to anyone who actually lives here that Simsbury’s wetlands are a key component to this town’s identity. It 
affects our wildlife, already a challenge to live with side by side, our overall quality of life, how we manage the town and 
how we raise our children. 
If we believe that the people who live here, not investors from outside, are the best champions for making our town the 
best it can be, then the Wetlands commission has the opportunity to stop this right now. I assume that committee 
members joined the committee to serve the town they love and were appointed because of a belief they would protect 
the town. I am fairly sure that the number of residents in favor of this type of development, if any, are minuscule 
compared to the numbers who are appalled by the concept. 
I have lived in Simsbury for 30 years. I am in my second home and would like to downsize and remain in Simsbury. I am 
not interested in an apartment. I feel there is an opportunity for the Wetlands committee to influence the exploration of 
what type of housing development best serves the town by saying no to such a large proposal that doesn’t add to the 
town’s needs but rather lines the pockets of outsiders who will grab the money and leave us to manage the schools, 
roads, bears, ambulance response time, traffic, garbage, crime, etc etc. 
Please reject this proposal. 
Mona Kelly 
3 Drumlin Rd 
West Simsbury, CT 06092 

Page 58 · open in PDF

To the Simsbury Inland Wetlands and Conservation Commission, 
I am writing to express my opposition to the proposed 669-unit development at the former 
Hartford site due to the significant and potentially irreversible impact it may have on nearby 
wetlands, water quality, wildlife habitat, and the surrounding upland review area. 
As acknowledged in the application materials, this proposal would disturb approximately 3.1 
acres within the upland review area adjacent to protected wetlands. The scale and intensity of 
this development raise serious concerns regarding whether the surrounding wetland systems 
can realistically be protected long term. 
While developers may propose mitigation plans on paper, the Commission must evaluate not 
only theoretical compliance, but the practical realities of maintaining environmental 
protections over decades of operation. A project of this magnitude inevitably introduces 
substantial long-term pressures on sensitive wetland ecosystems, including: 
• Increased stormwater runoff from roads, rooftops, parking areas, and other impervious 
surfaces   
• Greater risk of sedimentation and erosion during construction and after occupancy   
• Salt, de-icing chemicals, fertilizers, fuel residues, and other pollutants entering nearby 
wetlands and groundwater   
• Disturbance and fragmentation of wildlife habitat and natural ecological buffers   
• Increased invasive species pressure and disruption of native vegetation   
• Long-term maintenance and enforcement concerns once construction is complete 
Particularly concerning the issue of winter road and sidewalk treatment. Although the 
developer has referenced a future “salt management plan,” such plans are only effective if 
strictly followed and enforced indefinitely. Given the size of this proposed residential complex 
and the understandable expectations of tenants for safe driving and walking conditions during 
Connecticut winters, there is legitimate concern that salt and chemical usage could eventually 
exceed proposed limits, causing cumulative damage to nearby wetlands over time. 
Once wetlands are degraded through chloride contamination, runoff, or hydrologic disruption, 
restoration is often difficult or impossible. Future enforcement actions or fines after 
environmental damage occurs cannot fully reverse permanent ecological impacts. 
I respectfully ask the Commission to carefully consider whether the environmental risks 
associated with this proposal can truly be mitigated given the extraordinary scale and density of 
the development directly adjacent to protected wetland areas. 
The Inland Wetlands and Watercourses Act exists specifically to protect Connecticut’s fragile 
wetland resources from precisely this type of cumulative environmental pressure. I urge the 
Commission to prioritize long-term environmental stewardship and deny the application unless 

Page 59 · open in PDF

it can be conclusively demonstrated that the wetlands and upland review areas will not be 
adversely affected. 
Thank you for your time and consideration. 
Sincerely, 
Maureen Woronecki 
Simsbury Resident 

Page 60 · open in PDF

1
Macgilpin Brittany
From: eskaret@snet.net
Sent: Tuesday, May 19, 2026 6:49 PM
To: Macgilpin Brittany
Subject: Regarding the proposed 670 unit apartment complex on Hopmeadow Street
Warning: Unusual sender <eskaret@snet.net>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
Hello Brittany: 
I am unable to attend tonight and just got your email, so wanted to let you know of my concerns with the huge 
expansion of apartments in our beloved “small” town of Simsbury. I have lived in Simsbury all of my life and love 
the natural beauty and stunning historical buildings. If we keep adding apartments that are built by uncaring 
developers trying to make a quick buck, we lose the uniqueness of our town – which will decrease the value of 
property and impact the quality of life. Please help by putting an end to these types of “additions”. Money isn’t the 
end all. 
Thank you, 
Ellen McGrath Skaret 
Ellen 

Page 61 · open in PDF

1
Macgilpin Brittany
From: Julia Perrotta <juliacperrotta@gmail.com>
Sent: Tuesday, May 19, 2026 7:04 PM
To: Macgilpin Brittany
Subject: Concern over proposed 670 unit complex
Warning: Unusual sender <juliacperrotta@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
Good evening, 
I am a Simsbury resident. I was born here, moved back, and started my own family here. One of the 
things that makes our town special is the nature. It is our responsibility to be good stewards of the land. 
We have seen many developments go up in Simsbury. This one is far larger and more consequential to 
our wetlands, the water supply, and wildlife. I do not understand how the developer believes a larger 
complex is a better proposal than the previous one that was rejected. This new proposal should be 
rejected at all costs to protect our wetlands, our wildlife, our water, and the character of our town. I am 
writing to voice my deep concern and opposition to building such a complex in our town.  
Thank you, 
Julia Perrotta 
860-392-8014 

Page 62 · open in PDF

Jami Lewchik
4 Flintlock Ridge
Simsbury, CT 06070
jlewchik@gmail.com
May 19, 2026
Aft: Briftany MacGilpin, Assistant Town Planner
Town of Simsbury
933 Hopmeadow Street
Simsbury, CT 06070
bmacgilpin@simsbury-ct.gov
RE: Wriften Public Comment — Applicafion CC #26-02, SL Simsbury LLC, 200 Hopmeadow Street 
("Harfford South") — Confinued Public Hearing, May 19, 2026
Dear Chair Winters and Members of the Conservafion Commission / Inland Wetlands and 
Watercourses Agency:
I am a resident of Simsbury submifting these wriften comments for the record on Applicafion CC 
#26-02. I offer these comments not in any official capacity, only as an individual with a strong 
interest in the long-term protecfion of Simsbury's wetlands, watercourses, and natural 
resources. I have reviewed the applicafion materials posted to the Town's agenda center, 
including the May 4, 2026 Third-Party Review prepared by CHA and EcoMaps, LLC, the Staff 
Report dated May 5, 2026, the applicant's site plans, the Stormwater Management Report, the 
Biological Assessment, the Wetland Delineafion and Impact Reports, the Invasive Species 
Management Plan, the alternafive site plans, and the applicant's May 15, 2026 VHB response 
comments.
My comments are organized around the areas the Commission has both the authority and the 
obligafion to evaluate under CGS §§ 22a-36 through 22a-45, the Town of Simsbury Inland 
Wetlands and Watercourses Regulafions, and the elevated standard of CGS §22a-41(b)(1) — 
which applies here because the Commission unanimously classified this applicafion as a 
"significant acfivity" triggering a mandatory public hearing. Under that standard, a permit shall 
not be issued unless the Commission finds on the record that no feasible and prudent 

Page 63 · open in PDF

alternafive exists. The burden of making that showing rests with the applicant. Based on my 
review of the record, I respecffully submit that that burden has not yet been met.
I. THE ALTERNATIVES ANALYSIS IS LEGALLY INSUFFICIENT
The Third-Party Reviewers (CHA/EcoMaps, Comment No. 33) found that the applicant's 
alternafives analysis — while improved from its original single "no-build" scenario — sfill fails to 
safisfy the statutory requirement. The three alternafives evaluated are: (1) no-
build/abandonment; (2) maintaining the exisfing impervious footprint without any URA 
disturbance; and (3) the CP-2 configurafion, which would actually increase URA impacts. 
Crifically, the analysis does not evaluate:
  - Alternafive roadway alignments or configurafions for the two secfions of road proposed 
within the URA adjacent to Wetland 1 (the Minister Brook corridor) and Wetland 6 — the 
primary direct disturbance areas;
  - Alternafive stormwater outlet configurafions that could eliminate the need for the proposed 
new outlet pipe within the URA to Wetland 1; or
  - Reducfions in building footprint, unit count, or parking layout that could contract the limit of 
disturbance near regulated resource areas, parficularly proximal to the vernal pool complex.
The Town's own Third-Party Reviewers concluded: "The Applicant should provide a more 
complete alternafives analysis demonstrafing that no feasible and prudent alternafive exists for 
each proposed acfivity within the upland review area, consistent with the requirements of CGS 
§22a-42a." I urge the Commission to adopt this finding and require a complete, element-by-
element alternafives analysis before closing the hearing or rendering any decision.
II. STORMWATER MANAGEMENT: MULTIPLE UNRESOLVED DEFICIENCIES
The Third-Party Review idenfified no fewer than seventeen mandatory correcfions ("must 
revise," "must provide," "must review and revise") to the stormwater design. These are not 
minor comments. They include:
1. Impervious area classificafion (Comment No. 2): The Stormwater Report claims the site 
qualifies as "redevelopment" under the CT Stormwater Quality Manual because it exceeds 40% 
impervious area, which reduces the required water quality retenfion volume from 100% to 50%. 
CHA found that the exisfing impervious area may be below 40%, which would double the 
required retenfion volume. The applicant must provide documentafion to support this threshold 

Page 64 · open in PDF

classificafion. Unfil it does, the stormwater calculafions may be based on an incorrect, less 
protecfive standard.
2. Missing water quality units (Comment No. 4): Infiltrafion systems 2G and 6C are missing the 
water quality treatment units that the report itself says are required for all stormwater entering 
a closed drainage system. A considerable porfion of the access road network also lacks pre-
discharge water quality treatment.
3. Outlet control structure details missing (Comment No. 5): Site plans lack details and complete 
inverts for the outlet control structures that will meter stormwater from the infiltrafion basins. 
CHA stated this informafion is required to allow a "complete review" of the stormwater 
calculafions — meaning the stormwater system as submifted cannot be fully evaluated.
4. Mismatched elevafions throughout the plan set (Comments Nos. 6, 10, 15): Outlet invert 
elevafions for infiltrafion basins 1C, 2A, 2F, 2G, 2J, 6C, and 7B on the site plan do not match the 
drainage calculafions. Boftom-of-stone elevafions for basins 1C, 2D, 2F, 2G, 3A, 5C, 6C, and 7B 
are likewise inconsistent. These internal inconsistencies make independent verificafion of the 
stormwater calculafions impossible.
5. Freeboard deficiency (Comment No. 7): Above-ground infiltrafion basin 4P has only 0.2 feet 
of freeboard during the 100-year storm. The CT Stormwater Quality Manual requires 0.5 feet. 
As designed, this basin would be overtopped in a 100-year event, discharging uncontrolled 
stormwater toward wetlands.
6. Missing soil test pits (Comment No. 16): Required soil test pits have not been provided for 
infiltrafion basins 3A, 4A, and 6C. Without confirmed soil infiltrafion capacity at these specific 
locafions, there is no basis for concluding the infiltrafion systems will perform as designed.
7. Wetland hydrology impact unaddressed (Comment No. 24): This is the most consequenfial 
finding in the Third-Party Review. CHA found that the Stormwater Report does not evaluate: (a) 
how the proposed reducfion in discharge at Design Points DP2-5 and DP2-7 — which currently 
discharge directly to on-site wetlands — will affect the hydrology of those receiving wetlands; 
(b) how the shift from surface runoff to subsurface infiltrafion will affect groundwater recharge 
and hydroperiod in depressional wetlands currently sustained, at least in part, by stormwater; 
or (c) what proporfion of exisfing hydrologic inputs to each wetland system is aftributable to 
stormwater versus natural sources. CHA's conclusion: "the conclusion that no adverse impacts 
to wetland hydrology are anficipated is not substanfiated."

Page 65 · open in PDF

This last finding goes to the heart of the Commission's mandate. Wetlands 2, 4, 5, 6, and 7 are 
depressional systems that the applicant's own delineafion report idenfifies as shaped largely by 
exisfing stormwater discharge. The Commission cannot make a finding of no adverse wetland 
impact if the applicant has not demonstrated what will happen to those wetlands' water supply 
when the current stormwater regime is fundamentally altered. I urge the Commission to require 
a complete hydrologic analysis of each individual wetland system before this hearing closes.
III. VERNAL POOL HABITAT: INADEQUATE BIOLOGICAL ASSESSMENT AND PROTECTION 
MEASURES
The site contains confirmed vernal pool habitats in Wetlands 2, 4, 5, and 6, associated with 
wetland-obligate amphibians. The Third-Party Review (Comment No. 25) found that:
  - The applicafion materials do not provide a quanfitafive assessment of proposed disturbance 
relafive to the Crifical Terrestrial Habitat (CTH — 750-foot buffer) and the Vernal Pool Envelope 
(VPE — 100-foot buffer);
  - VHB's response to the Town Planner's specific March 10 request for informafion on reduced 
construcfion within the 750-foot buffer was non-responsive, stafing only that "vernal pool 
protecfion measures were agreed upon with NDDB" — which the Third-Party Reviewer correctly 
noted does not subsfitute for the Commission's independent evaluafion under the Simsbury 
Inland Wetlands and Watercourses Regulafions;
  - The biological assessment recommends further surveys during opfimal condifions (March 
through June) to rule out the presence of certain vernal pool species — those surveys have not 
been completed, meaning the Commission is being asked to decide on an applicafion whose 
biological baseline is acknowledged to be incomplete; and
  - Construcfion-phase impacts — including direct mortality of amphibians during seasonal 
migrafion, fragmentafion of movement corridors, and sedimentafion of egg masses — are not 
addressed by specific, enforceable construcfion-phase protecfion measures.
I ask the Commission to require complefion of opfimal-season vernal pool surveys before the 
hearing closes, and to require the eight specific protecfive measures idenfified by CHA/EcoMaps 
in Comment No. 25 as mandatory permit condifions.
IV. CONSTRUCTION PHASING: CUMULATIVE IMPACT UNCONFIRMED

Page 66 · open in PDF

The Third-Party Review (Comment No. 36) idenfifies a crifical gap: the submifted materials do 
not provide sufficient informafion to confirm that cumulafive disturbance within the URA, CTH, 
and VPE has been fully accounted for across all six construcfion phases combined. The Review 
requests confirmafion that the 3.76-acre URA disturbance figure cited in the Wetland Impact 
Assessment represents the total for all phases, not just Phase 1. Mulfi-phase construcfion in 
sensifive habitat areas poses parficular risks to vernal pool species during each successive 
phase, including during periods of inacfivity between phases when sediment and erosion 
controls may be inadequately maintained.
V. POST-CONSTRUCTION MONITORING: NO ENFORCEABLE MECHANISM
The applicafion proposes extensive nafive planfings within the URA, VPE, and CTH as the 
primary mifigafion measure. Yet no post-construcfion monitoring plan and no planfing success 
criteria have been submifted (Third-Party Review, Comment No. 35). Without defined 
performance thresholds and a structured monitoring program, there is no legal mechanism by 
which the Commission can evaluate whether the proposed habitat enhancements are actually 
achieved, or compel correcfive acfion if planfings fail. Any permit should require a monitoring 
plan with: percent survival and cover thresholds at years 1, 3, and 5; semi-annual inspecfions by 
a qualified wetland scienfist for at least three years; correcfive acfion protocols; invasive species 
monitoring; and a final compliance cerfificafion prior to release of any performance bond.
VI. ADDITIONAL CONCERNS
Dewatering: No informafion has been provided regarding the management of dewatering 
discharge during ufility installafion or excavafion, parficularly in areas proximal to wetlands 
(Third-Party Review, Comment No. 34).
Arfificial Lighfing: The photometric plan does not clearly demonstrate that light spill at wetland 
boundaries, parficularly adjacent to the vernal pool complex (Wetlands 2, 4, 5, 6), approaches 
0.0–0.1 footcandles. Arfificial lighfing is a documented disruptor of amphibian migrafion and 
breeding behavior (Third-Party Review, Comment No. 31).
Synthefic Erosion Control Materials: The use of welded plasfic or "photodegradable" erosion 
control mafting within the URA and CTH poses documented wildlife entrapment risks. Only 
natural biodegradable materials (jute, coir, cofton) should be permifted proximal to wetlands 
(Third-Party Review, Comment No. 26).

Page 67 · open in PDF

Invasive Species Management Plan: The submifted ISMP lacks defined limits of management, 
treatment schedule, measurable success criteria, and an adapfive management component 
(Third-Party Review, Comment No. 30). An inadequately monitored ISMP within the VPE and 
CTH can cause repeated disturbance that undermines the habitat the applicafion claims to 
protect.
VII. REQUEST FOR RELIEF
Based on the foregoing, I respecffully request that the Commission:
1. Not close the public hearing unfil the applicant has provided complete responses to all 
mandatory items idenfified in the Third-Party Review, and the Third-Party Reviewer has 
confirmed in wrifing that those responses are safisfactory;
2. Require the complefion of opfimal-season vernal pool surveys (spring, March–June) and 
submission of results before the hearing is closed;
3. Require a complete, element-by-element feasible and prudent alternafives analysis as 
specified in Third-Party Review Comment No. 33 and CGS §22a-42a, specifically addressing 
roadway alignment alternafives, stormwater outlet alternafives, and reduced-footprint design 
opfions for each area of proposed URA disturbance; and
4. Make express findings under CGS §22a-42a regarding the absence of feasible and prudent 
alternafives for each specific regulated acfivity proposed within the upland review area, prior to 
rendering any decision.
Thank you for your considerafion of these comments and for your confinued dedicafion to 
protecfing Simsbury's wetlands and natural resources.
Respecffully submifted,
Jami Lewchik
4 Flintlock Ridge
Simsbury, CT 06070
jlewchik@gmail.com
617-872-9219

Page 68 · open in PDF

1
Macgilpin Brittany
From: Diane G. Nash <dianegnash@gmail.com>
Sent: Tuesday, May 19, 2026 3:37 PM
To: Macgilpin Brittany
Subject: Public hearing statement
Warning: Unusual sender <dianegnash@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions. 
Diane Nash 
5 Merrywood 
Simsbury, CT 06070 
When 8-30G was enacted with the lofty purpose of creating more opportunity for housing to the less affluent, it 
was not meant to be used as a weapon to provide wealth to developers, while destroying resources that are 
needed and beneficial to all. 
This application is a blatant example of just that. 
While FEMA is expanding the 100 year flood plain and adding more information to update risks due to climate 
science research, and just now, homeowners flood insurance premiums have increased due to that increased 
risk, many now are suddenly aware of how fragile is our environment and our need for it’s protection. 
That in itself would be substantial reason for this application to be denied. 
Floodplain and wetlands, …with storm sewers and catch basins to mitigate harm , should not be tested, 
considered or negotiated. 
First  
Do no harm 
Reject this application 

Page 69 · open in PDF

1
Macgilpin Brittany
From: ERIC BLEIMEISTER <ebleimeister@comcast.net>
Sent: Tuesday, May 19, 2026 3:41 PM
To: Macgilpin Brittany
Subject: Hopmeadow Apartment/housing complex at Old Hartford Insurance grounds
Warning: Unusual sender <ebleimeister@comcast.net>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions. 
Hello Brittany  
I have serious concerns about the size of this complex and the future  constraints and 
potential negative effect on the town's infrastructure concerning utilities, public services 
and schooling.  Also the amount of  run off this size of the community (the largest 
single development in CT?) can generate is a concern to wetlands.  
The previous submission from the Silverman group was struck down for good reason 
and now they come back with a larger development --that's nonsensical. I do not trust 
that an out of state developer has the best interest of this community in mind.       
Please list my concerns for tonight's meeting. Thank you.   
Sincerely,  
Eric Bleimeister  
11 Pheasant lane  
Weatogue   
cell: 860-466-0181  
ebleimeister@comcast.net  

Page 70 · open in PDF

1
Macgilpin Brittany
From: Emily Stanley <emilywnichols@gmail.com>
Sent: Tuesday, May 19, 2026 5:02 PM
To: Macgilpin Brittany
Subject: Message for the wetlands/conservation committee
Warning: Unusual sender <emilywnichols@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
Hello,  
As a resident of Simsbury, I am writing to the Wetlands/Conservation committee members to voice my 
strong concern and opposition to the proposed development by the Silverman Group.  
Thank you, 
Emily Stanley  

Page 71 · open in PDF

1
Macgilpin Brittany
From: Kristin Ciaramella <kciaramella@astarinc.com>
Sent: Tuesday, May 19, 2026 6:11 PM
To: Macgilpin Brittany
Subject: Wetlands Hearing 5/19
Warning: Unusual sender <kciaramella@astarinc.com> 
You don't usually receive emails from this address. 
Make sure you trust this sender before taking any acfions.
Good Evening, 
In the event that I do not make it back into town tonight on fime to get to the Wetlands hearing - per direcfion, I wanted 
to send over my concerns in hopes that they (along with others) get passed along to the commiftee members.
I, like many other Simsbury residents (my husband and I own the home at 23 Banbury Dr, West Simsbury) of Simsbury 
have serious concerns about the large development potenfially being approved and going in at The (former) Harfford 
site. 
I realize that the commiftee will have nothing to do with what potenfially comes after and in regards to the zoning and IF 
it becomes an 8-30g project - that’s why I am hoping that the commiftee take the concerns of current residents seriously.
Concerns being adequate storm systems, management of the area - they may present the commiftee with “a plan” for 
everything but what happens when it doesn’t actually happen, after they’ve begun building and inevitably don’t follow 
through or maintain follow through when it comes to adhering to an agreed upon policy with the conservafion 
commiftee? What real recourse is there? A fine? For permanent damage to the wetlands - they aren’t concerned about 
evasive pest management, about disturbing natural habitats of the wetlands. They are concerned about gefting their 
large development and raking in $ for it - as it will NOT end up falling under “affordable housing”. They do not care about 
Simsbury. 
They were denied once and came back to sue and present a LARGER plan.  
Please, please - do not approve this to move on to the next phase.  
They will have their team draw up a slew of plans, promises, confingencies and answers - what is there to promise any of 
it will be adhered to? It’s not worth the risk to the wetlands. 
Krisfin Ciaramella
Operafions Coordinator (Northeast)
860-735-6045 

Page 72 · open in PDF

1
Macgilpin Brittany
From: The Toccos <thehomeplace138@gmail.com>
Sent: Thursday, June 4, 2026 4:42 PM
To: Macgilpin Brittany
Subject: Fwd: Written comment re: Application CC #26-02
Warning: Unusual sender <thehomeplace138@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
Requesting this to be read at hearing and/or added to administrative record.  
If there is a better contact I can’t email this to please advise. Thanks so much! 
Lauren Tocco 
---------- Forwarded message ---------- 
From: The Toccos <thehomeplace138@gmail.com> 
Date: Thursday, June 4, 2026 
Subject: Written comment re: Application CC #26-02 
To: "bmacgilpin@simsbury-ct.gov" <bmacgilpin@simsbury-ct.gov> 
Dear Conservation Commission/Inland Wetlands and Watercourses 
Agency and Town Leadership,
I am writing as a deeply concerned resident and supporter of Simsbury to 
express my strong opposition to the proposed 689-unit development that 
threatens some of our community's most valuable and irreplaceable wetlands.
Simsbury is not just a collection of houses and roads—it is a community 
defined by its natural beauty, environmental stewardship, and thoughtful 
balance between growth and conservation. Our wetlands are an essential part 
of that identity. They provide critical wildlife habitat, help prevent flooding, 
filter pollutants from our waterways, recharge groundwater supplies, and 
contribute to the scenic character that makes Simsbury such a special place to 
live.
Once these wetlands are disturbed or destroyed, they cannot truly be replaced. 
No amount of mitigation can recreate the complex ecosystems that have 
developed over generations. The loss of these natural resources would have 
lasting consequences not only for the environment but also for neighboring 
properties, public infrastructure, and future generations of Simsbury residents.

Page 73 · open in PDF

2
The scale of this proposed 689-unit development raises serious concerns about 
increased stormwater runoff, traffic congestion, strain on municipal services, 
and the cumulative impact on our town's infrastructure and quality of life. 
Growth should be carefully planned and aligned with the values and long-term 
vision of the community—not pursued at the expense of the natural resources 
that make Simsbury unique.
Residents have consistently demonstrated that they value open space, 
environmental preservation, and responsible development. We ask that these 
voices be heard. Protecting our wetlands is not simply an environmental issue; 
it is an investment in the future health, safety, and character of our town.
I respectfully urge you to deny approval of this proposal in its current form 
and to prioritize alternatives that protect Simsbury's wetlands and preserve 
the qualities that residents cherish. We have a responsibility to leave future 
generations a town that is as beautiful, resilient, and environmentally rich as 
the one we enjoy today.
Please help preserve our beloved town and the irreplaceable natural resources 
that define it.
Sincerely,
Lauren Tocco 
Simsbury, Connecticut

Page 74 · open in PDF

1
Macgilpin Brittany
From: Peter Church <ptchurch33@gmail.com>
Sent: Saturday, June 6, 2026 4:17 PM
To: Macgilpin Brittany
Subject: Just One Voice | Opposition to App No: CC 26-02
Warning: Unusual sender <ptchurch33@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
Ms. MacGilpin and Members of the Simsbury Conservation Commission, Inland Wetlands Agency, and 
Town Leadership: 
I’ve been here a bit.  I have lived in Simsbury for 54 years. 
I played hockey “back in the day: at Simsbury Farms when an open air rink and chain-link fence stood 
where plexiglass stands today. I was in the last 3rd grade class at Belden School before it was converted 
to Town Offices. I remember when the single lane bridges across the Farmington River were converted to 
what they are today. 
I have supported growth with the build of the International Skating Center at the north end of town. I 
supported preserving the Tulmeadow property. I supported the solar project at the north end of town. I 
supported thoughtful economic development when I believed it strengthened Simsbury's future through 
the “future development” conversations were coordinated years ago under then First Selectman, Mary 
Glassman. I also worked at Hartford Life, years ago … I know the property. 
None of this gives me any privilege. I recognize it all doesn’t afford me anything materially different.  A 
vote is a vote and … one voice is a voice. However, all of this gives me some perspective that I believe 
matters. 
Please accept my opposition to Application No: CC 26-02, the proposed 669-unit development at 
200 Hopmeadow Street and request this be added to the official record of opposition.  Please also 
know that this is not opposition to change. It is opposition to uncertainty at a scale that cannot be 
undone. 
You and other technical experts will debate wetlands, groundwater, stormwater, wildlife habitat, traffic, 
schools, and infrastructure. Those discussions matter. They matter a lot.  And, the fact that so many 
questions remain unresolved matters even more. Because this project is different. I do not see this 
development proposal as simply another application before a commission. It is the kind of decision that 
becomes a dividing line in a town's history. There will be a Simsbury before it, and a Simsbury after it.  
The question before you is not whether it can be built. The broader question is whether, decades from 
now, we will be grateful that was decided. Are we prepared for what this will do the environment, the 
resources and overall impact - in every way in which impact can be assessed?  After 54 years in this 
town, I am not convinced we will. More discussion is needed and a thoughtful conversation - a 
collaborative discussion - with the property owner and developer and the Town about what is mutually 
beneficial would be ideal and, arguably, necessary.  
For that reason, I respectfully urge you to reject this proposal in its current form. 

Page 75 · open in PDF

2
Some decisions can be revisited. This is not one of them. 
Respectfully, 
Peter T. Church 
Simsbury Resident 

Page 76 · open in PDF

1
Macgilpin Brittany
From: ABE HARTZ <ahartz0906@aol.com>
Sent: Saturday, June 6, 2026 1:56 PM
To: Macgilpin Brittany; Ziemnicki Ryan
Subject: Hopmeadow Silverman project 
Warning: Unusual sender <ahartz0906@aol.com> 
You don't usually receive emails from this address. 
Make sure you trust this sender before taking any acfions.
My wife and I have aftended the meefings and have been very concerned about this proposed development. I am 
wrifing to express our deep concern and opposifion to the approval of this applicafion.
Its sheer size, complexity and impact to the environment and the nature of our community will be impacted negafively. 
No mafter the best efforts, its magnitude cannot have anything but a downside. And the temerity to increase the scope 
of a previously denied applicafion shows, at least to us, a lack of honesty. How can they succeed when a lesser project 
could not? 
While affordable housing is and should be a mindful concern, it needs to thoughfful and never at the expense of our 
natural habitat and wildlife. 
Simsbury has already approved the Vessel development and Iron Horse development. Too soon, too many, too impacfful.
We urge you to deny the applicafion.
Thank you. 
Sincerely,  
Abe and Lori Hartz 
>  
Sent from my iPhone 

Page 77 · open in PDF

June 5, 2026 
Simsbury Conservation Commission 
Inland Wetlands and Watercourse Agency 
Town of Simsbury 
933 Hopmeadow Street 
Simsbury, CT 06070 
Subject:  Opposition to Wetlands Permit Application – The Ridge At Talcott Mountian 
South 200 Hopmeadow Street (Application CC#26-02) 
Dear Commission Members,  
As a long-time resident of Simsbury,  I am writing in firm opposition to the wetlands permit 
application submitted by SL Simsbury, LLC for the proposed 689 unit residential 
development at 200 Hopmeadow Street, known as The Ridge At Talcott Mountain South.  
Having reviewed the application materials, the CHA third -party review and the town 
Engineering Department’s memorandum filed with this Commission on May 5, 2026, I urge 
you as a Simsbury resident to deny this permit.   
This site is uniquely and critically sensitive.  The 124.6 acre parcel is bounded by the 
Farmington River (a federally designated Wild and Scenic River), Hopmeadow Street, and 
Minister Brook.  The applicant’s own Wetland Delineation Report acknowledges that 
wetlands comprise nearly 48 acres (or 38%) of the site, including riparian corridors of both 
Minister Brook and the Farmington River, which confluence on the property.   Vernal pools 
supporting state-listed wood frogs, as well as floodplain forest critical habitat, are present 
throughout the site. Development of this scale – 689 units, 17 apartment buildings, 27 
duplexes and 19 single-family homes and parking for over 1200 vehicles – poses a direct 
and serious long-term threat to these resources.  
After reviewing the application materials and the independent findings now before the 
Commission, I have identified several significant deficiencies that I respectfully ask you to 
examine closely: 
1. The application has material unresolved deficiencies confirmed by the town’s own 
reviewers.   The CHA third party review letter (May 4, 2026) and the town engineering 
memorandum (May 5, 2026) both identify outstanding problems the applicant has 
not resolved.  The town engineer confirmed CHA’s stormwater and erosion control 
concerns without exception, and independently found that: the erosion and 
sediment control phasing plan is “not sufficient”; some sediment trap drainage 

Page 78 · open in PDF

areas exceed five acres, requiring engineered sediment ponds that were not 
provided; additional protective measures are needed specifically upslope of the 
vernal pools; vernal pool locations are not identified on all plan sheets; and utility 
connections to Hopmeadow are inadequately depicted.     Therefore the application 
before this Commission remains materially incomplete.  
2.  The alternative analysis is wholly inadequate.   The applicant’s Wetland Impact 
Assessment offers only a single alternative: leaving the site abandoned.  
Connecticut’s Inland Wetlands and Watercourses Act requires a genuine analysis of 
alternatives that would reduce wetlands impacts.  A reduced density development, 
a different site layout,  clustering of structures further from the river and Minister 
brook are not considered anywhere.  This was flagged by the commission directly in 
its March 17th meeting minutes – the application still does not answer that question.  
3. The CT DEEP NDDB determination reveals significant unresolved federal risks.   The 
February 20, 2026 NDDB letter (determination 202503798) identifies an 
extraordinary concentration of state and federally listed species on or adjacent to 
this site,  including the Federally and State endangered Dwarf Wedgemussel in the 
Farmington River, the State Endangered Atlantic coast leopard frog, six state-listed 
plant species included the State Endangered Purple giant hyssop, and multiple 
state Special Concern turtle, bat and mussel species,   DEEP’s sign-off explicitly 
permits reductions to the 300 – foot Farmington River riparian buffer where the 
development footprint requires it – meaning the buffer protecting a federally 
designated river is already being compromised by the project design.  Furthermore, 
the presence of a Federally Endangered species may require Section 7 Consultation 
with the US Fish and Wildlife Service under the Endangered Species Act.  The 
application does not address whether this federal review has been initiated or 
completed.   
4. There is no cumulative impact analysis.  The stormwater modeling assesses this site 
in isolation, with no accounting for the combined downstream effects of this 
development alongside the existing Ridge at Talcott Mountian (phase 1) directly to 
the north, or other large-scale developments approved or under consideration in the 
Farmington River watershed.  No single regulatory body has been asked to evaluate 
what these projects mean collectively for water quality, flood capacity, wetland 
function and river health.   This commission has both the authority and the 
responsibility to demand that analysis before issuing any permit.   

Page 79 · open in PDF

5. The conservation conditions attached to the NDDB determination are extensive and 
unenforceable at this scale.   The DEEP letter imposes numerous species-specific 
construction protocols – seasonal tree-cutting restrictions for bat species, daily 
herpetologist monitoring during turtle active season, exclusionary fencing 
maintenance, and reporting requirements for listed species encounters – across 
what will be a multi-phase, multi-year construction project. The commission should 
carefully consider whether adequate enforcement mechanisms exist to ensure 
these conditions are honored.  
6. In addition,  this application does not take into account the broader and longer 
terms natural environment impacts of this development.  First,  more cars means 
more road salt, motor oil, brake dust and tire particle run-off – all of which drain to 
Minister Brook and the Farmington river.  The storm water plan addresses peak flow 
attenuation but says nothing about the long-term chronic pollutant loading from 
1200+ vehicles using a network of roads daily.  In addition, it is foreseeable, that 
dropping 689 units (with people and cars) into this area creates service demand – 
retail, amenities and traffic infrastructure – the drives secondary development on 
currently undeveloped land nearby. The broader impact on the human movement in 
and around  Simsbury and Farmington Valley will substantially and negatively 
impact the natural environment, the wildlife and the river in and around this valley 
for decades to come.  
Thank you for the opportunity to provide these comments.     
Sincerely,  
Lisa Harris 
436 Firetown Road 
Simsbury Connecticut 06070 
860-882-9302 

Page 80 · open in PDF

1 | P a g e  
 
June 6, 2026 
Conservation Commission / Inland Wetland and Watercourses Agency 
Brittany MacGilpin, Assistant Town Planner 
Ryan Ziemnicki, Land Use Specialist 
Town of Simsbury 
933 Hopmeadow Street 
Simsbury, CT 06070 
Re: Opposition to Application — CC 26-02, The Ridge at Talcott Mountain South, SL 
Simsbury LLC, 200 Hopmeadow Street, Simsbury, CT 
Dear Commission Members: 
I am writing as a nearby resident and Simsbury taxpayer to formally oppose the 
approval of CC 26-02, The Ridge at Talcott Mountain South. I am unable to attend the 
public meeting in person and respectfully request that this letter be entered into the 
official record. 
I have read the complete record available to the public: the original CHA/EcoMaps 
independent review (May 4, 2026), VHB’s responses to CHA comments (May 15, 
2026), VHB’s responses to Town Engineering comments (May 27, 2026), VHB’s 
updated DCIA response (June 2, 2026), and the final CHA second review (June 4, 
2026). I want to be precise about what this record shows, because I think precision 
serves the Commission better than overstatement. 
The June 4 CHA review closes the majority of the original 36 comments. That is a 
meaningful improvement from where this application stood in May. However, three 
issues remain that I believe are either unresolved, conditionally resolved in a way the 
Commission should scrutinize, or resolved in CHA’s view but inadequately in mine. I 
address each directly. 
I. What the June 4 CHA Review Confirms Is Resolved 
In the interest of accuracy, the following major items from the original CHA review have 
now been closed to CHA’s satisfaction, and I accept them as such: 
• Stormwater redevelopment classification and DCIA documentation — confirmed 
by CT DEEP (Comments 2, resolved). 
• Missing water quality units at infiltration systems 2G and 6C, and on the access 
roads (Comment 4, resolved). 
• Outlet control structure details and invert elevations (Comments 5, 6, resolved). 
• Freeboard at basin 4P corrected to 0.5 feet (Comment 7, resolved). 
• Water quality unit sizing provided (Comment 8, resolved). 

Page 81 · open in PDF

2 | P a g e  
 
• Soil test pits for basins 3A, 4P, and 6C — CHA states “Provided. This comment 
is addressed” (Comment 16, resolved). 
• Wetland hydrology analysis — CHA states “This comment has been addressed, 
no further action needed” (Comment 24, resolved). 
• Vernal pool habitat and construction protections — CHA states “This comment 
has been addressed, no further action needed” (Comment 25, resolved). 
• Erosion control materials, phasing plan, sediment traps, construction entrances, 
dewatering, lighting, alternatives analysis, post-construction monitoring, and 
construction phasing — all resolved per CHA (Comments 18–23, 26–29, 31–36). 
I acknowledge this is a substantially improved application compared to what was before 
the Commission in May. CHA has done its job rigorously, and VHB has responded to 
most of its findings. The Commission should take seriously that its independent 
reviewer has signed off on the majority of the technical concerns. 
II. What Remains Genuinely Unresolved: Two Open CHA Items 
Comment 7 — Basin 4P Freeboard Elevation Discrepancy (still open) 
CHA’s June 4 Reviewer Response 7 states: “The Designer revised the basin to provide 
the required freeboard; however, the drainage calculations indicate a grated outlet 
elevation of 167.50 and the plans indicate an elevation of 167.40. The Designer must 
revise the plans to match the calculations.” 
This is not resolved. There is a 0.10-foot discrepancy between the site plan and the 
stormwater calculations for the outlet elevation of basin 4P. While this may seem minor 
in isolation, basin 4P is the above-ground infiltration basin for which CHA previously 
found insufficient freeboard during a 100-year storm. The freeboard correction was the 
entire purpose of revising this basin. If the plan and calculations still disagree on the 
outlet elevation, the Commission cannot confirm the correction was actually 
implemented correctly. This must be reconciled before approval. 
Comment 22 — Straw Wattle Installation Detail and Natural Materials 
Specification (still open) 
CHA’s June 4 Reviewer Response 22 states: “A detail should be added to Sheet C-6.6 
for straw wattle installation and should note that all wattles must be constructed of 100% 
natural material... Additionally, we recommend sediment barrier be added up gradient of 
the stone infiltration trench in Phase 5 to prevent silting of the stone trench during 
stabilization.” 
This is also not resolved. CHA’s Reviewer Response 26 cross-references this, noting 
that the 100% natural materials requirement currently applies only to erosion control 
blankets, not to the straw wattles being used at the infiltration basin slopes. Given that 
these wattles will be installed adjacent to wetlands and vernal pool resources, the 
specification of natural materials matters for wildlife protection — precisely the concern 

Page 82 · open in PDF

3 | P a g e  
 
that drove CHA’s original comment. The detail sheet and the natural materials note 
must be added before the Commission approves the plan. 
III. What CHA Has Accepted But the Commission Should Scrutinize 
Comment 30 — Invasive Species Management Plan Treatment Threshold 
CHA’s June 4 Reviewer Response 30 is the most substantive remaining concern in the 
record, and notably CHA does not close it — it recommends the Commission take 
further action. CHA finds that the ISMP’s 10% invasive cover treatment threshold is 
problematic because it is unclear whether the threshold applies site-wide or locally. As 
CHA states directly: a localized infestation of 50% cover adjacent to a vernal pool may 
not trigger treatment if the 10% threshold is averaged across the broader management 
area. CHA explicitly recommends that the Commission require the applicant to abandon 
the 10% threshold and instead prescribe treatment of all invasive vegetation within 25 
feet of the project area for a two-year period. 
This is not a minor procedural point. The vernal pool-adjacent wetlands on this site — 
Wetlands 2, 4, 5, 6, and 7 — are precisely the areas most vulnerable to invasive 
encroachment during and after construction disturbance. Japanese knotweed, Asiatic 
bittersweet, and multiflora rose are aggressive colonizers of disturbed soil and wetland 
edges, and once established they are extremely difficult to eradicate. A treatment 
threshold that is too coarse to catch localized infestations at wetland boundaries is a 
threshold that may fail at the moment it matters most. I urge the Commission to require 
the applicant to revise the ISMP consistent with CHA’s updated recommendation before 
any approval is issued. 
Comment 18 — Phase 1 to Phase 7 Drainage Gap 
CHA’s June 4 Reviewer Response 18 closes the phasing comment overall but raises a 
specific new concern it flags for discussion: “It appears runoff from the Phase 1 
southern access road drains to and is treated by the water quality basin in Phase 7. The 
Commission and the Designer should discuss how this drainage will function if Phase 7 
is not constructed or if significant time passes between the construction of Phase 1 and 
Phase 7.” 
This is not a resolved item — CHA is explicitly directing the Commission to ask the 
applicant about it in the hearing. Phase 1 is the first construction phase. Phase 7 is the 
last. If the project stalls, is modified, or is built out over many years — all realistic 
possibilities for a 689-unit development — Phase 1 access road drainage may 
discharge untreated for an extended period. The Commission should require the 
applicant to provide a specific answer: what stormwater treatment will serve the Phase 
1 southern access road between Phase 1 construction and Phase 7 completion, and 
what enforceable mechanism guarantees Phase 7 is built? 
Comment 35 — Post-Construction Monitoring Duration 
CHA closed Comment 35 with the exception of the invasive species threshold (tied to 
Comment 30). However, I note that CHA’s original recommendation called for 

Page 83 · open in PDF

4 | P a g e  
 
monitoring for a minimum of three years, while VHB committed to only two years. CHA 
accepted the two-year commitment without further objection in the June 4 review. I 
would ask the Commission to consider whether two years is sufficient for a 689-unit 
development adjacent to vernal pool resources — particularly given that invasive 
species re-colonization and planting establishment failure may not manifest within the 
first two growing seasons. This is a judgment call for the Commission, but one worth 
making explicitly rather than by default. We should all be aware that managing invasive 
species is challenging well beyond even 3 years. 
IV. The Time-of-Year Restriction Start Date 
One issue is not addressed anywhere in the CHA reviews because it falls within CHA’s 
accepted resolution of Comment 25, but I believe it deserves the Commission’s 
independent attention. VHB’s committed time-of-year restriction within the Vernal Pool 
Envelope begins March 1. CHA’s original recommendation specified “generally late 
February through April” as the peak migration period. The scientific literature is 
consistent that the first mass amphibian migration events — triggered by the first warm 
rainy nights above approximately 40°F — begin in late February in Connecticut, 
sometimes as early as February 20 in mild years. 
A restriction that begins March 1 may miss the single most concentrated migration 
event of the entire year. The cost of beginning the restriction on February 15 instead of 
March 1 is two weeks of construction flexibility in one zone of the site. The cost of 
getting it wrong is direct mortality to spotted salamanders and wood frogs during the 
breeding event that determines the entire year’s reproductive success for those pools. I 
ask the Commission to condition any approval on a February 15 restriction start date 
within the VPE. 
V. Summary and Requests 
The record before this Commission reflects a genuinely improved application. CHA’s 
independent review process has worked as it is supposed to: it identified serious 
deficiencies, the applicant responded, and most responses were accepted. I respect 
that process and I am not asking the Commission to ignore it. 
What I am asking is that the Commission not approve the application with two CHA 
comments still open, and that it address three additional issues that the record itself 
flags as needing Commission attention. Specifically, I respectfully request that the 
Commission: 
• Require resolution of Comment 7 (basin 4P outlet elevation discrepancy between 
plans and calculations) before any approval, as this directly affects the freeboard 
adequacy of a stormwater basin adjacent to regulated resources; 
• Require resolution of Comment 22 (straw wattle natural materials detail and 
Phase 5 sediment barrier) before any approval, as these materials will be used 
adjacent to wetlands and vernal pool habitat; 

Page 84 · open in PDF

5 | P a g e  
 
• Require the applicant to revise the Invasive Species Management Plan 
consistent with CHA’s June 4 Updated Recommendation on Comment 30 — 
abandoning the 10% averaged threshold and prescribing treatment of all invasive 
vegetation within 25 feet of the project area for two years — before any approval; 
• Direct the applicant at the hearing to provide a specific, enforceable answer to 
CHA’s Comment 18 question: what stormwater treatment will serve the Phase 1 
southern access road if Phase 7 is significantly delayed or not built, and what 
mechanism ensures Phase 7 is constructed?; and 
• Condition any approval on a time-of-year restriction within the Vernal Pool 
Envelope beginning February 15, not March 1, to capture the full peak amphibian 
migration window identified in the scientific literature. 
These are targeted, record-based requests. If the Commission addresses them — 
either as conditions of approval or by requiring further response before voting — the 
remaining environmental concerns in this record will have been handled through exactly 
the process of independent review and responsive correction that the IWWA is 
designed to provide.  
However, the wetlands and vernal pools adjacent to this site are not abstract concerns 
— they are functioning ecosystems that filter water, support wildlife, and contribute to 
the environmental character of Simsbury that makes it a desirable community. Once 
destroyed or degraded, they cannot be restored.  
Therefore, I urge the Commission to apply the precautionary principle and decline to 
approve a development that poses this level of foreseeable and irreversible harm. 
 
Thank you for your consideration of this letter and your service to Simsbury. I 
respectfully request that it be entered into the official record for CC 26-02. 
Sincerely, 
 
Judith Ebbets 
17 Notch Road 
West Simsbury, CT 
jebbets553@gmail.com 

Page 85 · open in PDF

1
Macgilpin Brittany
From: Sonny Mehta <sonnynmehta@hotmail.com>
Sent: Sunday, June 7, 2026 1:28 PM
To: Ziemnicki Ryan; Macgilpin Brittany
Cc: awanimehta@yahoo.com
Subject: Public Comment – Opposition to Hopmeadow Street Development Application (SL 
Simsbury LLC / 200 Hopmeadow Street)
Warning: Unusual sender <sonnynmehta@hotmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
June 7, 2026
Subject: Public Comment – Opposition to Hopmeadow Street Development Application (SL 
Simsbury LLC / 200 Hopmeadow Street)
Dear Members of the Town of Simsbury, Conservation Commission / Inland Wetlands & 
Watercourses Agency,
We respectfully oppose this proposal and urge the Commission to deny the application.
While your review is focused on wetlands and environmental impacts, those impacts cannot be 
separated from the broader, long-term consequences for our community. As stewards, the 
Commission must recognize how the health of the Farmington River and its associated wetlands 
and watercourses is directly tied to the character, sustainability, and capacity of Simsbury, 
including stormwater and water quality impacts and habitat loss and fragmentation.
This is about much more than a turtle, an owl, or a fox. How many remaining places of this 
ecological scale and quality do we have left in Simsbury? The Commission must not enable a 
project that would damage any one of our remaining wetlands, and should instead act to protect 
these irreplaceable resources by rejecting the application.
Thank you for your time and consideration.
Sincerely,
Sandeep and Awani Mehta 
Town of Simsbury residents

Page 86 · open in PDF

June 5, 2026
Ms. Margery Winters - Chair
Conservation Commission/Inland Wetlands & Watercourse Agency
Simsbury Town Office
933 Hopmeadow Street
Simsbury, CT 06070
Subject: Application No: CC26-02  (Hartford South)
Dear Margery,
This letter is intended to provide concern regarding this application for +689 new apartments. 
The Inland Wetlands & Watercourse Agency (IWWA) plays very important role as a regulatory 
agency and a permitting body.  You and the Commissioners on IWWA are the first line of 
defense to protect against development that has a negative impact on Simsbury’s wetlands and 
watercourses.
The members of the IWWA heard many arguments regarding this planned development at its 
public hearing.  I am not able to attend the June 9th public hearing and wanted to at least provide 
my thoughts.  
The criteria for decision is outlined in Section 10.2 in the Wetland Regulations.  So let me focus 
on some of 10.2’s subsections. Most of this letter will focus on water and the environmental 
impact of this proposed application.
10.2 a. states: “the environmental impact of the proposed regulated activity on wetlands or 
watercourses which may include:”
10.2 a..1. states: “the amount and nature of material to be removed or deposited and the projected 
effect on the water table, drainage patterns, flood control, water supply and quality, and aquatic 
or benthic organisms.” 
Regardless of how it is stated by the development the simple facts are that Simsbury is supplied 
by Aquarion Water thru 3 main wells.  The fourth being closed due to environmental concerns. It 
is impossible not to recognize the impact not only on the water table, as well as the water supply.  
Especially since the new and massive apartment complex on Iron Horse will be coming online 
soon. 
10.2 a.3 states: “likelihood of siltation and leaching, and any resulting adverse effects on water 
quality and aquatic life.”
The Farmington River is a federally designated Wild and Scenic Waterway and is not only one of 
Simsbury’s greatest natural resources but of the entire Connecticut region that it flows into and 
along.  It is hard to imagine that a project of this size, despite any best efforts, would not have on 
this valuable waterway and ecosystem.

Page 87 · open in PDF

2
10.2 a.7 states: “importance of the area to the region with respects to water supply, water 
purification, flood control, natural habitat, recreation, open space and size:”
The is a lot just in this section of the regulation.  Again, water supply, water purification, are 
states, along with many other important items.  Many have been mentions by Simsbury residents 
in a past survey which became part of the most recent Plan of Development.  Again, it is nearly 
impossible, despite best efforts, to minimize the impact such a large development would have 
because of motor oil, antifreeze, heavy metals from construction, pet waste and fertilizer among 
other pollutants. 
10.2.a.9 states: “the effects on inland wetland’s or watercourse’s natural capacity to support 
desirable biological life, prevent flooding, supply water, control sediment, facilitate drainage, and 
promote public health and safety.”
Again, this relates to the supply of water.  It also touches on the negative impact that such a large 
development has on the rest of the residents and businesses when a water supply issue occurs, 
and it will.  This has a direct effect on public health and safety as well. 
10.2.c is important as well.  It states: “the relationship between the short- and long-term impacts 
of the proposed regulated activity on wetlands and watercourses and the maintenance and 
enhancement of long-term productivity of such wetlands or watercourses including the potential 
for preservation and/or management of local ecosystems;”
Short term gains vs long term damage.  In the short-term Simsbury officials may look at grand 
list growth as a positive, however the long-term damage is much greater.  (police, fire, EMT, 
schools, traffic, etc.)  But that is not the reason for my concerns not the role of IWWA.  It is 
again the negative long-term impact on the ecosystem, including Minster Brook and the 
Farmington River.
10.2.d states: “irreversible and irretrievable loss of wetland and watercourse resources which 
would be caused by the proposed regulated activity, including but not limited to the extent to 
which such activity would foreclose a future ability to protect, enhance or restore such 
resources,…..”
Once such a massive project is completed it would be virtually impossible to protect or restore 
the natural resources of this property.  Hartford Life once occupied this property.  It was a 
building where workers came in the morning and left in the afternoon.  Its impact, while not 
insignificant, would pale in comparison to what is proposed.  It is also important to note that 
environmental regulations from the 1980’s are much different than they are today. 
In conclusion, let me first thank the Commissioners for serving on this very important 
commission.  I also hope you will consider all the points made in this letter and use them, in 
addition to the many points brought up by others, to reject this application in any form.  It is 
important not only for Simsbury today, and those communities downstream, but for the future.

Page 88 · open in PDF

3
Respectfully,
Paul W. Henault
Paul W. Henault
12 Wyngate
Simsbury, CT 06070
pwhenault@gmail.com
Note: The use of italic is strictly mine and not part of the regulation.  It is meant for emphasis.

Page 89 · open in PDF

To:    Ms. Margery Winters – Chair 
Conservation Commission/Inland Wetlands & Watercourse Agency 
Conservation Commission Members 
 
CC:  George McGregor, Director of Planning and Community Development 
  Britan MacGilpin, Assistant Town Planner  
 
Subject:   Application No: CC26-02 (Hartford South) 
Date:  June 8, 2026 
Just Vote No! 
The Farmington River, a federally designated Wild and Scenic waterway, is being 
assaulted from both sides by development proposals that will permanently alter the 
character of our town. 
This is not a debate about whether Simsbury needs housing. As a local Realtor, I 
understand all too well the challenges many families face in finding suitable housing. 
What our community desperately needs are middle-market, owner-occupied homes and 
additional senior living options—not more large-scale rental developments. 
The story of conservation in Simsbury began more than a century ago with visionaries 
such as Gifford Pinchot, the Eno family, and George P. McLean, who recognized the 
importance of protecting our natural resources for future generations. Their efforts laid 
the foundation for conservation in our community, including the creation of the 
remarkable McLean Game Refuge, which remains one of Connecticut's most important 
ecological treasures. In addition, since its founding in 1970, the Simsbury Land Trust has 
protected thousands of acres of open space, preserving wildlife corridors, wetlands, 
forests, and scenic landscapes that define our community and enhance our quality of life 
much of it done with private funding.  
As development pressures continue throughout our region and new proposals come 
before our local boards and commissions, the work of conservation has never been more 
important. We all have a responsibility to protect the character, beauty, and natural 
resources that make Simsbury such a special place to live. 
It is time for residents to take back control of our town and send a clear message that we 
will not allow developers to exploit loopholes in flawed state laws to advance projects 
that the public overwhelmingly does not support. Despite repeated concerns raised by 
residents, state leaders have failed to address these loopholes, leaving communities like 
ours vulnerable to developments that can dramatically reshape our landscape. 

Page 90 · open in PDF

Please do not be swayed by promises that cannot be guaranteed over the long term. 
While developers may offer assurances today, there is no practical way to ensure that 
future owners will maintain the same standards of environmental stewardship, property 
management, or operational oversight. Nor does the town have the resources or authority 
to effectively monitor and mitigate environmental impacts decades into the future. 
The decisions we make today will have lasting consequences. Once wetlands are 
disturbed, wildlife habitats fragmented, traffic increased, and open space lost, those 
impacts cannot simply be reversed. We owe it to future generations to be thoughtful 
stewards of the natural resources that previous generations worked so hard to protect. 
For the sake of our river, our environment, our community character, and future 
generations, I urge you to vote no. 
Respectfully submitted, 
 
Kris Barnett 
15 Ox Yoke Drive, Simsbury 
 

Page 91 · open in PDF

1
Macgilpin Brittany
From: O. Liggio <oliggio@gmail.com>
Sent: Monday, June 8, 2026 3:10 PM
To: Ziemnicki Ryan; Macgilpin Brittany
Subject: Public Comment – Application CC 26-02
Warning: Unusual sender <oliggio@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
Dear Land Use Specialist Ryan Ziemnicki and Assistant Town Planner Brittany MacGilpin, 
Please accept this email as a public comment regarding Application CC 26-02 for the proposed 
development at 200 Hopmeadow Street. 
I am concerned about the scale of this proposal and its potential impacts on wetlands, stormwater 
management, and surrounding natural resources. My understanding is that the independent third-party 
review identified a number of outstanding questions relating to hydrology, stormwater management, 
habitat disturbance, and erosion and sedimentation controls. 
Given the magnitude of this project, I respectfully request that the Commission ensure that all 
outstanding comments and issues identified during the review process are fully addressed and made 
part of the public record before any decision is made on the application. 
I am not asking the Commission to predetermine the outcome. Rather, I am asking that any decision be 
based on a complete and thoroughly vetted record so that residents can have confidence that potential 
impacts to wetlands, waterways, and neighboring properties have been adequately evaluated. 
Thank you for your time and consideration. Please include this correspondence in the official 
administrative record for Application CC 26-02. 
Sincerely, 
Olivia Liggio 
Homeowner, Simsbury, CT 
___________________
OLIVIA LIGGIO
To help protect your privacy, Microsoft Office prevented automatic download of this picture from the  
Internet.

Page 92 · open in PDF

1
Macgilpin Brittany
From: Stephanie Riefe <steph.riefe@gmail.com>
Sent: Monday, June 8, 2026 3:10 PM
To: Ziemnicki Ryan; Macgilpin Brittany
Subject: Public Comment — Application No.: CC 26-02
Warning: Unusual sender <steph.riefe@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
To:
Town of Simsbury, Conservation Commission/Inland Wetlands & Watercourses Agency c/o Land Use 
Specialist Ryan Ziemnicki 
and 
Assistant Town Planner Brittany MacGilpin
My name is Stephanie Riefe. I live at 5 Trainor Drive in Weatogue. I respectfully request this be 
added to the OFFICIAL ADMINISTRATIVE RECORD.
The proposed application No.: CC 26-02 involves construction of a 689-unit residential development 
on approximately 125 acres at 200 Hopmeadow Street in Simsbury, Connecticut.
This is what I know. I am not an expert in land use or water courses and cannot converse 
knowledgeably on development. I can say that if wetlands are going to be impacted, it would be a 
loss that would damage our environment in ways that will have long-lasting negative effects. Water 
courses and wetlands are part of the living ecosystem that sustains us. 
The language below is something that I read from a knowledgeable person about this and if these 
are accurate, I agree with them. 
[The proposed project being] immediately adjacent to and hydrologically connected with 
approximately 47 acres of wetlands and watercourses, multiple vernal pool systems, Minister Brook, 
and the Farmington River floodplain corridor.
The project includes extensive grading, roadway construction, utility installation, underground 
stormwater infrastructure, infiltration systems, repeated disturbance within upland review areas, and 
substantial construction activity within mapped vernal pool habitat and Critical Terrestrial Habitat 
(“CTH”).
Based upon the application materials and the independent technical review prepared by CHA and 
EcoMaps, LLC, (“the review”), the current record does not yet contain substantial evidence 
demonstrating that the proposed activities will avoid unreasonable impairment of wetlands, 
watercourses, groundwater resources, vernal pool systems, wildlife habitat, and associated ecological 
functions protected under Connecticut law.

Page 93 · open in PDF

2
Thank you, Stephanie Riefe

Page 94 · open in PDF

1
Macgilpin Brittany
From: Rotondo, Michelle <Michelle.Rotondo@talcottresolution.com>
Sent: Monday, June 8, 2026 2:38 PM
To: Ziemnicki Ryan; Macgilpin Brittany
Subject: Request to Deny Wetlands Application CC 26-02
Warning: Unusual sender <michelle.rotondo@talcottresolution.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
Aftenfion: Land Use Specialist, Ryan Ziemnicki, and Assistant Town Planner, Briftany MacGilpin,
Dear Members of the Simsbury Conservafion Commission/Inland Wetlands & Watercourses Agency,
I am wrifing to respecffully request that the Commission deny Applicafion CC 26-02 for the proposed large-
scale residenfial development at 200 Hopmeadow Street.
Based upon the third-party technical review and the informafion currently before the Commission, significant 
concerns remain regarding the project's potenfial impacts on wetlands, watercourses, and adjacent natural 
resources. These concerns appear substanfial enough that the Commission cannot reasonably determine that 
the proposed acfivity complies with the requirements of Connecficut's Inland Wetlands and Watercourses Act 
or the Town's wetlands regulafions.
In parficular, I urge the Commission to carefully consider the unresolved issues idenfified in the third-party 
review regarding: 
• Hydrology (Comment 24): The applicafion does not appear to provide sufficient informafion regarding 
exisfing and post-development hydrologic condifions. Without a complete understanding of groundwater and 
surface-water interacfions, the Commission cannot adequately assess the project's impacts on wetland 
funcfions and values.
• Stormwater Management (Comment 32): Quesfions remain regarding the adequacy of the stormwater 
management system and whether post-development runoff will be properly controlled. Given the scale of the 
proposed development, uncertainfies regarding runoff quanfity, water quality treatment, and downstream 
impacts warrant denial unfil these issues are fully resolved.
• Upland Habitat Disturbance (Comment 32): The extensive disturbance proposed within the upland review 
area raises concerns regarding habitat fragmentafion, loss of wildlife corridors, and degradafion of ecological 
funcfions that support adjacent wetlands. These impacts should be thoroughly evaluated before any permit is 
considered. 
• Erosion and Sediment Control (Comments 20-23 and 36): The project involves substanfial earth disturbance 
and construcfion acfivity. The third-party review idenfifies concerns regarding erosion and sedimentafion risks 
during construcfion. Failure of these controls could result in direct and irreversible impacts to wetlands and 
watercourses. 

Page 95 · open in PDF

2
The Commission previously determined that this applicafion may have a significant impact on surrounding 
wetlands and watercourses and therefore required independent third-party review. In light of the unresolved 
technical concerns idenfified by that review, I respecffully submit that the applicant has not met its burden of 
demonstrafing that wetland impacts have been adequately avoided, minimized, or mifigated.
Unfil the deficiencies idenfified by the third-party reviewer are fully addressed and supported by credible 
technical evidence, approval would be premature and inconsistent with the Commission's responsibility to 
protect Simsbury's wetlands and watercourses. 
For these reasons, I respecffully request that the Commission deny Applicafion CC 26-02. 
Thank you for your considerafion and for your service to the Town of Simsbury.
Sincerely, 
Michelle Rotondo, 
4 Adams Road 
This message, including any attachment(s), is intended only for the person(s) to which it is addressed 
and may contain privileged, confidential and/or insider information. If you have received this 
communication in error or are not be the intended recipient, please notify us immediately by replying to 
the message, delete the message and any attachments from your computer, and be aware that any use, 
reproduction, or distribution of this message or its attachment(s) is strictly prohibited. Any disclosure, 
copying, distribution, or the taking of any action concerning the contents of this message and any 
attachment(s) by anyone other than the named and intended recipient(s) is strictly prohibited. This 
message, including any attachment(s), is intended only for the person(s) to which it is addressed and 
may contain privileged, confidential and/or insider information. If you have received this communication 
in error or are not be the intended recipient, please notify us immediately by replying to the message, 
delete the message and any attachments from your computer, and be aware that any use, reproduction, 
or distribution of this message or its attachment(s) is strictly prohibited. Any disclosure, copying, 
distribution, or the taking of any action concerning the contents of this message and any attachment(s) 
by anyone other than the named and intended recipient(s) is strictly prohibited.  

Page 96 · open in PDF

1
Macgilpin Brittany
From: Sara Westhaver <sara.westhaver@gmail.com>
Sent: Monday, June 8, 2026 8:46 PM
To: Macgilpin Brittany; Ziemnicki Ryan
Subject: Request to Deny Wetlands Application CC 26-02
Warning: Unusual sender <sara.westhaver@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
Attention: Land Use Specialist, Ryan Ziemnicki, and Assistant Town Planner, Brittany MacGilpin, 
Dear Members of the Simsbury Conservation Commission/Inland Wetlands & Watercourses Agency, 
I am writing to respectfully request that the Commission deny Application CC 26-02 for the proposed 
large-scale residential development at 200 Hopmeadow Street. 
Based upon the third-party technical review and the information currently before the Commission, 
significant concerns remain regarding the project's potential impacts on wetlands, watercourses, and 
adjacent natural resources. These concerns appear substantial enough that the Commission cannot 
reasonably determine that the proposed activity complies with the requirements of Connecticut's Inland 
Wetlands and Watercourses Act or the Town's wetlands regulations. 
In particular, I urge the Commission to carefully consider the unresolved issues identified in the third-
party review regarding: 
• Hydrology (Comment 24): The application does not appear to provide sufficient information regarding 
existing and post-development hydrologic conditions. Without a complete understanding of groundwater 
and surface-water interactions, the Commission cannot adequately assess the project's impacts on 
wetland functions and values. 
• Stormwater Management (Comment 32): Questions remain regarding the adequacy of the stormwater 
management system and whether post-development runoff will be properly controlled. Given the scale 
of the proposed development, uncertainties regarding runoff quantity, water quality treatment, and 
downstream impacts warrant denial until these issues are fully resolved. 
• Upland Habitat Disturbance (Comment 32): The extensive disturbance proposed within the upland 
review area raises concerns regarding habitat fragmentation, loss of wildlife corridors, and degradation 
of ecological functions that support adjacent wetlands. These impacts should be thoroughly evaluated 
before any permit is considered. 
• Erosion and Sediment Control (Comments 20-23 and 36): The project involves substantial earth 
disturbance and construction activity. The third-party review identifies concerns regarding erosion and 
sedimentation risks during construction. Failure of these controls could result in direct and irreversible 
impacts to wetlands and watercourses. 

Page 97 · open in PDF

2
The Commission previously determined that this application may have a significant impact on 
surrounding wetlands and watercourses and therefore required independent third-party review. In light 
of the unresolved technical concerns identified by that review, I respectfully submit that the applicant 
has not met its burden of demonstrating that wetland impacts have been adequately avoided, 
minimized, or mitigated. 
Until the deficiencies identified by the third-party reviewer are fully addressed and supported by credible 
technical evidence, approval would be premature and inconsistent with the Commission's responsibility 
to protect Simsbury's wetlands and watercourses. 
For these reasons, I respectfully request that the Commission deny Application CC 26-02. 
Thank you for your consideration and for your service to the Town of Simsbury. 
Sincerely, 
Sara Westhaver 
6 Adams Road, Weatogue  

Page 98 · open in PDF

1
Macgilpin Brittany
From: Taylor Lyden <taylorlyden1@gmail.com>
Sent: Monday, June 8, 2026 9:28 PM
To: Ziemnicki Ryan; Macgilpin Brittany
Subject: Public comment for the official administrative record
Warning: Unusual sender <taylorlyden1@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
Mr. Ziemnicki, Ms. MacGilpin, and the Town of Simsbury, Conservation Commission/Inland Wetlands & 
Watercourses Agency: 
I am writing in hopes of submitting a written public comment about the proposed Silverman Group 
project - The Ridge at Talcott Mountain (South), as I am unable to attend the meeting in person tomorrow 
night.   
              I am a frequent visitor to Nod Brook Wildlife Management Area and spend a great deal of time 
down near the river.  I am deeply concerned about the proposed project and the developer’s follow-
through. I understand that they have hired experts who say the right things (and are paying Simsbury’s 
third-party reviewer), but I have little faith that they have any intention of standing behind their promises. 
I have many concerns, but the one that I will highlight for the purposes of this email is that their plans are 
generally geared towards the construction and building plans, not the ongoing presence of the complex.
              The size of the development is akin to several hotels all banded together and though I’m not a 
wildlife scientist, I don’t think it takes an advanced degree to know that adding what amounts to 10-12 
hotels or so next to a sensitive environment can only harm it.  To suggest otherwise is – as my 
grandmother would have put it – “hog’s wash.” Once the complex is completed and the developers 
manage it from afar (or sell it), there is no meaningful way to hold them to their promises. Any fines that 
may be levied for polluting or violating terms would amount to a minor business expense for them; a drop 
in the bucket compared to what they stand to make on the project.  Beyond that, they are unable to 
control the actions of the thousands of people suddenly inhabiting the land next to one of our most 
precious town resources and the inevitable light, noise, and environmental pollution that they will create 
for the flora and fauna.   
              I respectfully urge that the commission preserve the wetlands and deny this project.   
Most sincerely,  
Taylor Lyden 
9 Oakhurst Rd., Simsbury, CT 

Page 99 · open in PDF

1
Macgilpin Brittany
From: christineds1213@yahoo.com
Sent: Monday, June 8, 2026 10:04 PM
To: Macgilpin Brittany; Ziemnicki Ryan
Subject: Conservation Commission/Inland Wetlands & Watercourses Agency File No.:  CC 26-02, 
200 Hopmeadow St.
External sender <christineds1213@yahoo.com>  
Make sure you trust this sender before taking any actions.  
Dear Town of Simsbury, Connecficut, Conservafion Commission/Inland Wetlands & Watercourses Agency:
Thank you for allowing the Nofice of Intervenfion, submifted on May 19, 2026, to be entered into the record 
for review by the Commission and Town Aftorney.
I respecffully wish to clarify that the purpose of the filing in not to accuse the Commission or predetermine the 
outcome of the applicafion, but rather to assist in ensuring that the administrafive record is complete, that all 
the necessary data is obtained, and that all environmental issues within the Commission’s jurisdicfion are fully 
evaluated before a final decision is made. 
As a cifizen parficipant, I necessarily relied upon the applicafion materials, consultant reports, and third-party 
technical review already contained within the public record in aftempfing to idenfify unresolved 
environmental concerns relafing to wetlands, hydrology, stormwater, habitat impacts, and related ecological 
resources. 
The filing was submifted in good faith pursuant to Connecficut General Statutes 22a-19 and was intended to 
help preserve and clarify environmental issues for considerafion within the administrafive process.
Thank you for your fime, aftenfion, and public service.
Respecffully,
Chrisfine Sinopoli

Page 100 · open in PDF

1
Macgilpin Brittany
From: Bradley Schuster <bradleylschuster@gmail.com>
Sent: Monday, June 8, 2026 5:03 PM
To: Ziemnicki Ryan; Macgilpin Brittany
Subject: Request to Deny Wetlands Application CC 26-02
Warning: Unusual sender <bradleylschuster@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
Attention: Land Use Specialist, Ryan Ziemnicki, and Assistant Town Planner, Brittany MacGilpin 
Dear Members of the Simsbury Conservation Commission/Inland Wetlands & Watercourses Agency, 
I am writing to respectfully request that the Commission deny Application CC 26-02 for the proposed 
large-scale residential development at 200 Hopmeadow Street. The specific wording below has been 
shared with me by other concerned neighbors but I share these concerns and am firmly against this 
massive development further impacting the character and ecology of Simsbury. 
Based upon the third-party technical review and the information currently before the Commission, 
significant concerns remain regarding the project's potential impacts on wetlands, watercourses, and 
adjacent natural resources. These concerns appear substantial enough that the Commission cannot 
reasonably determine that the proposed activity complies with the requirements of Connecticut's Inland 
Wetlands and Watercourses Act or the Town's wetlands regulations. 
In particular, I urge the Commission to carefully consider the unresolved issues identified in the third-
party review regarding: 
• Hydrology (Comment 24): The application does not appear to provide sufficient information regarding 
existing and post-development hydrologic conditions. Without a complete understanding of groundwater 
and surface-water interactions, the Commission cannot adequately assess the project's impacts on 
wetland functions and values. 
• Stormwater Management (Comment 32): Questions remain regarding the adequacy of the stormwater 
management system and whether post-development runoff will be properly controlled. Given the scale 
of the proposed development, uncertainties regarding runoff quantity, water quality treatment, and 
downstream impacts warrant denial until these issues are fully resolved. 
• Upland Habitat Disturbance (Comment 32): The extensive disturbance proposed within the upland 
review area raises concerns regarding habitat fragmentation, loss of wildlife corridors, and degradation 
of ecological functions that support adjacent wetlands. These impacts should be thoroughly evaluated 
before any permit is considered. 
• Erosion and Sediment Control (Comments 20-23 and 36): The project involves substantial earth 
disturbance and construction activity. The third-party review identifies concerns regarding erosion and 

Page 101 · open in PDF

2
sedimentation risks during construction. Failure of these controls could result in direct and irreversible 
impacts to wetlands and watercourses. 
The Commission previously determined that this application may have a significant impact on 
surrounding wetlands and watercourses and therefore required independent third-party review. In light 
of the unresolved technical concerns identified by that review, I respectfully submit that the applicant 
has not met its burden of demonstrating that wetland impacts have been adequately avoided, 
minimized, or mitigated. 
Until the deficiencies identified by the third-party reviewer are fully addressed and supported by credible 
technical evidence, approval would be premature and inconsistent with the Commission's responsibility 
to protect Simsbury's wetlands and watercourses. 
For these reasons, I respectfully request that the Commission deny Application CC 26-02. 
Thank you for your consideration and for your service to the Town of Simsbury. 
Sincerely, 
Bradley Schuster 
11 Harding Drive 

Page 102 · open in PDF

1
Macgilpin Brittany
From: Jenny Euting <jeneuting@gmail.com>
Sent: Tuesday, June 9, 2026 8:12 AM
To: Ziemnicki Ryan; Macgilpin Brittany
Subject: Please protect our wetlands
Warning: Unusual sender <jeneuting@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
I cannot attend tonight's meeting in person. 
Please know that while I support affordable housing in Simsbury, I believe it can and must be created 
responsibly.  
I prefer our housing...any housing... doesn't impact our wetlands, and the plants and animals that 
already live there. 
Most plans are just that....plans. Things go wrong, even when unintentional, even when someone cares. 
The margins, contingency, and safeguards must be such that when they are breached (which inevitably 
happens, as history tells us), we do not put the wetlands at risk. 
Thank you for representing the residents of Simsbury. 
Jenny Euting  
28 Pine Glen Rd 
Simsbury, CT 06070 
jenny euting
pronouns: she/her
m: 860-324-0745
h: 860-651-7111 

Page 103 · open in PDF

1
Macgilpin Brittany
From: Rotondo, Michelle <Michelle.Rotondo@talcottresolution.com>
Sent: Monday, June 8, 2026 11:01 PM
To: Ziemnicki Ryan; Macgilpin Brittany
Subject: RE: Request to Deny Wetlands Application CC 26-02
Warning: Unusual sender <michelle.rotondo@talcottresolution.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
Ryan and Briftany,
I also respecffully ask that my below comment be added to the official administrafive record.
Thank you again, 
Michelle Rotondo 
From: Rotondo, Michelle  
Sent: Monday, June 8, 2026 2:38 PM 
To: 'rziemnicki@simsbury-ct.gov' <rziemnicki@simsbury-ct.gov>; 'bmacgilpin@simsbury-ct.gov' <bmacgilpin@simsbury-
ct.gov> 
Subject: Request to Deny Wetlands Application CC 26-02 
Aftenfion: Land Use Specialist, Ryan Ziemnicki, and Assistant Town Planner, Briftany MacGilpin,
Dear Members of the Simsbury Conservafion Commission/Inland Wetlands & Watercourses Agency,
I am wrifing to respecffully request that the Commission deny Applicafion CC 26-02 for the proposed large-
scale residenfial development at 200 Hopmeadow Street.
Based upon the third-party technical review and the informafion currently before the Commission, significant 
concerns remain regarding the project's potenfial impacts on wetlands, watercourses, and adjacent natural 
resources. These concerns appear substanfial enough that the Commission cannot reasonably determine that 
the proposed acfivity complies with the requirements of Connecficut's Inland Wetlands and Watercourses Act 
or the Town's wetlands regulafions.
In parficular, I urge the Commission to carefully consider the unresolved issues idenfified in the third-party 
review regarding: 
• Hydrology (Comment 24): The applicafion does not appear to provide sufficient informafion regarding 
exisfing and post-development hydrologic condifions. Without a complete understanding of groundwater and 
surface-water interacfions, the Commission cannot adequately assess the project's impacts on wetland 
funcfions and values.
• Stormwater Management (Comment 32): Quesfions remain regarding the adequacy of the stormwater 
management system and whether post-development runoff will be properly controlled. Given the scale of the 
proposed development, uncertainfies regarding runoff quanfity, water quality treatment, and downstream 
impacts warrant denial unfil these issues are fully resolved.

Page 104 · open in PDF

2
• Upland Habitat Disturbance (Comment 32): The extensive disturbance proposed within the upland review 
area raises concerns regarding habitat fragmentafion, loss of wildlife corridors, and degradafion of ecological 
funcfions that support adjacent wetlands. These impacts should be thoroughly evaluated before any permit is 
considered. 
• Erosion and Sediment Control (Comments 20-23 and 36): The project involves substanfial earth disturbance 
and construcfion acfivity. The third-party review idenfifies concerns regarding erosion and sedimentafion risks 
during construcfion. Failure of these controls could result in direct and irreversible impacts to wetlands and 
watercourses. 
The Commission previously determined that this applicafion may have a significant impact on surrounding 
wetlands and watercourses and therefore required independent third-party review. In light of the unresolved 
technical concerns idenfified by that review, I respecffully submit that the applicant has not met its burden of 
demonstrafing that wetland impacts have been adequately avoided, minimized, or mifigated.
Unfil the deficiencies idenfified by the third-party reviewer are fully addressed and supported by credible 
technical evidence, approval would be premature and inconsistent with the Commission's responsibility to 
protect Simsbury's wetlands and watercourses. 
For these reasons, I respecffully request that the Commission deny Applicafion CC 26-02. 
Thank you for your considerafion and for your service to the Town of Simsbury.
Sincerely, 
Michelle Rotondo, 
4 Adams Road 
This message, including any attachment(s), is intended only for the person(s) to which it is addressed 
and may contain privileged, confidential and/or insider information. If you have received this 
communication in error or are not be the intended recipient, please notify us immediately by replying to 
the message, delete the message and any attachments from your computer, and be aware that any use, 
reproduction, or distribution of this message or its attachment(s) is strictly prohibited. Any disclosure, 
copying, distribution, or the taking of any action concerning the contents of this message and any 
attachment(s) by anyone other than the named and intended recipient(s) is strictly prohibited. This 
message, including any attachment(s), is intended only for the person(s) to which it is addressed and 
may contain privileged, confidential and/or insider information. If you have received this communication 
in error or are not be the intended recipient, please notify us immediately by replying to the message, 
delete the message and any attachments from your computer, and be aware that any use, reproduction, 
or distribution of this message or its attachment(s) is strictly prohibited. Any disclosure, copying, 
distribution, or the taking of any action concerning the contents of this message and any attachment(s) 
by anyone other than the named and intended recipient(s) is strictly prohibited.  

Page 105 · open in PDF

1
Macgilpin Brittany
From: Rotondo, Michelle <Michelle.Rotondo@talcottresolution.com>
Sent: Tuesday, June 9, 2026 11:41 AM
To: Macgilpin Brittany; Ziemnicki Ryan
Subject: Written comment regarding Application # CC 26-02
Warning: Unusual sender <michelle.rotondo@talcottresolution.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
(please add to official administrafive record)
Dear Members of the Simsbury Conservafion Commission/Inland Wetlands & Watercourses Agency,
I am wrifing to respecffully request that the Commission deny Applicafion CC 26-02 for the proposed large-
scale residenfial development at 200 Hopmeadow Street.
I’d like to focus on the 765-page stormwater report that was submifted on May 27th, urge you to render the 
findings of this report inconclusive based on ineffecfive tesfing methods, and request a re-test. 
The developer hired GEI Consultants to dig a total of 22 test pits, 16 of which were dug in January, and 6 
addifional pits in May. One would think a soil tesfing expert would know that groundwater tesfing during 
frozen-ground condifions in the middle of winter is not effecfive and does not accurately represent typical 
groundwater condifions. Frozen soil restricts infiltrafion and groundwater levels are typically lowest in the 
winter. By no surprise, all 16 test pits in January did not reveal groundwater intrusion.  
Fast forward to May, in a normal spring fime season to test for groundwater, and results were as such: 3 out 
of the 6 test pits observed groundwater intrusion while two test pits were abandoned due to either a sidewall 
cave-in because of unstable soil or ufility pipes encountered (these two pits should have automafically been 
deemed inconclusive and re-tested). A quesfion I’d pose of the “expert”: if GEI was there digging again in May, 
why didn’t they re-dig the original 16 frozen test pits for a more effecfive test result? Could it be because they 
knew groundwater would now be present? 
To understand the true hydrology of soil and how an area funcfions as a wetland, the Commission should 
request groundwater monitoring over mulfiple seasons or during periods when groundwater is expected to be 
high (spring-fime, not winter). I therefore urge the Commission to deem this report inconclusive and demand 
the applicant to conduct another observafion of all 22 test pits, especially the 16 frozen ones, where normal 
site hydrology was not originally present.  
Thank you, 
Michelle Rotondo 
4 Adams Rd 
This message, including any attachment(s), is intended only for the person(s) to which it is addressed 
and may contain privileged, confidential and/or insider information. If you have received this 

Page 106 · open in PDF

2
communication in error or are not be the intended recipient, please notify us immediately by replying to 
the message, delete the message and any attachments from your computer, and be aware that any use, 
reproduction, or distribution of this message or its attachment(s) is strictly prohibited. Any disclosure, 
copying, distribution, or the taking of any action concerning the contents of this message and any 
attachment(s) by anyone other than the named and intended recipient(s) is strictly prohibited. This 
message, including any attachment(s), is intended only for the person(s) to which it is addressed and 
may contain privileged, confidential and/or insider information. If you have received this communication 
in error or are not be the intended recipient, please notify us immediately by replying to the message, 
delete the message and any attachments from your computer, and be aware that any use, reproduction, 
or distribution of this message or its attachment(s) is strictly prohibited. Any disclosure, copying, 
distribution, or the taking of any action concerning the contents of this message and any attachment(s) 
by anyone other than the named and intended recipient(s) is strictly prohibited.  

Page 107 · open in PDF

1
Macgilpin Brittany
From: Ziemnicki Ryan
Sent: Tuesday, June 9, 2026 9:43 AM
To: Macgilpin Brittany
Subject: FW: Conservation wetlands
From: Emily Mullen <ebs0010@gmail.com>  
Sent: Tuesday, June 9, 2026 9:41 AM 
To: Ziemnicki Ryan <rziemnicki@simsbury-ct.gov> 
Subject: Conservation wetlands 
Town of Simsbury CT, Conservation Commi ssion/Inland Wetlands & Watercourses, c/ o Ryan Zi emni cki Pleas e consider this emai l  written public comment and put it into the public record by Tuesday, June 9th.  I am agai nst the  proposal for 68 9 units at 200  
Warning: Unusual sender <ebs0010@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
Town of Simsbury CT, Conservation Commission/Inland Wetlands & Watercourses, c/o Ryan Ziemnicki 
Please consider this email written public comment and put it into the public record by Tuesday, June 
9th. 
I am against the proposal for 689 units at 200 Hopmeadow St. on a parcel with 47 acres of wetlands.
5 years ago when we were relocating to Connecticut,  
we found that the lack of development and nature conservation ideology is part of what made 
Simsbury so appealing to us.  
Wetlands are an irreplaceable, fragile natural resource. The wetlands and watercourses are essential 
to an adequate supply of surface and underground water; to hydrological stability and control of 
flooding and erosion; to the recharging and purification of groundwater; and to the existence of many 
forms of animal, aquatic and plant life. Many inland wetlands and watercourses have already been 
destroyed or are in danger of destruction. 
For these reasons I implore the town not move forward with the development proposal for the sake of 
all Simsbury residents. Let’s keep Simsbury a beautiful healthy thriving ecosystem for my children 
and everyone else’s.  
Thank you! 
Emily Mullen 

Page 108 · open in PDF

1
Macgilpin Brittany
From: Ziemnicki Ryan
Sent: Tuesday, June 9, 2026 11:56 AM
To: Macgilpin Brittany
Subject: FW: Public Comment- Propsed Housing Development
From: Emily D <emily.s.debiase@gmail.com>  
Sent: Tuesday, June 9, 2026 11:53 AM 
To: Ziemnicki Ryan <rziemnicki@simsbury-ct.gov> 
Subject: Public Comment- Propsed Housing Development 
Hello, I am writing as a deeply conc erned Simsbury resident regarding the proposed 669-unit developme nt on H opmead ow Street and the broader impact on the ope n space s and natural resources withi n our commu nity.   I am alarmed that a developm ent of this mag  
Warning: Unusual sender <emily.s.debiase@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
Hello, 
I am writing as a deeply concerned Simsbury resident regarding the proposed 669-unit development 
on Hopmeadow Street and the broader impact on the open spaces and natural resources within our 
community.
I am alarmed that a development of this magnitude is even being contemplated in Simsbury. While I 
support reasonable and thoughtfully planned housing opportunities, this proposal is completely out of 
scale with our town and threatens to have a significant negative impact upon  Simsbury's natural 
resources. 
Rather than allowing growth to occur gradually and responsibly over time, this proposal would force 
an enormous population increase in a single location and within a compressed time frame, creating 
immediate problems related to our loss of open spaces/wildlife habitats, current and future 
opportunities for conservation, and issues with groundwater resources that will not only impact 
wildlife, but also the residents of this community. 
A project of this magnitude requires careful and deliberate review. At this time, there are several 
critical areas where it is not yet clear that the Town has the capacity or infrastructure to support 
additional growth. It is essential that this be fully evaluated and clearly communicated before moving 
forward.
I, and many other residents are rightly concerned about:
 The impact of increased traffic congestion along Hopmeadow Street and surrounding 
roadways. This not only adds to the levels of auto pollution within the environment  
 The significant loss of open space, wildlife habitat, and opportunities for conservation. 
 Impacts to wetlands, watercourses, stormwater management, and groundwater resources 
identified during the project's technical review process. 

Page 109 · open in PDF

2
 The condition and capacity of the sewer system, especially in relation to the water treatment 
facility 
 Aquarion Water’s ability to provide sufficient potable water, particularly with an existing well 
offline due to contamination 
Once development of this size is approved, the impacts cannot easily be reversed. For these 
reasons, I strongly oppose moving forward with this proposed development. 
Please add my comment to the official administrative record. It is my understanding that the 
commission can’t render a decision without thorough evaluation/analysis for all 36 third party 
comments and until full testing is completed. 
Sincerely,  
Emiy DeBiase  
12 Lincoln Lane 
Weatogue, CT 06089 

Page 110 · open in PDF

1
Macgilpin Brittany
From: S Goldman <silvia.goldman@yahoo.com>
Sent: Tuesday, June 9, 2026 12:54 PM
To: McGregor George; Macgilpin Brittany
Subject: Silverman’s group proposed development for 689 units
Warning: Unusual sender <silvia.goldman@yahoo.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
Dear Members of the Conservation Commission/Inland Wetlands and Watercourses Agency, 
I am writing as a concerned resident to express my strong concerns regarding the proposed large-
scale development. 
I am not an expert on wetlands but the environmental impacts of this project clearly appear to be 
significant and deserve careful consideration. A development of this size will inevitably bring a 
substantial increase in traffic, with an estimated 1,000 additional vehicles traveling through and in the 
area on a regular basis and multiple times during the day. The resulting air pollution, noise pollution, 
and increased human activity will negatively affect the sensitive wetland ecosystem and the wildlife 
that depend upon it. 
I would expect that the wetlands and surrounding habitats currently provide refuge, feeding grounds, 
breeding areas, and migration corridors for numerous species. Increased traffic, construction activity, 
noise, and artificial lighting can disrupt these natural behaviors, forcing animals to abandon 
established habitats and migrate elsewhere. Such displacement can have long-term consequences 
for local biodiversity and ecological balance. 
In addition, constant vehicle traffic and nighttime lighting can alter wildlife movement patterns, 
increase stress on animal populations, and degrade the natural character of the area. The cumulative 
impacts of pollution, habitat fragmentation, and human disturbance should not be underestimated. 
I respectfully urge the Conservation Commission/Inland Wetlands and Watercourses Agency to 
carefully evaluate the full environmental consequences of this development, including its effects on 
wetland functions, wildlife habitats, migration patterns, water quality, and the overall ecological 
dynamics of the surrounding area. Protecting these wetlands is essential not only for wildlife but also 
for preserving the environmental health and character of our community for future generations. 
Thank you for your time and consideration of these concerns.  
Please confirm this will be included in your public hearing records. 
Sincerely, 
Silvia Goldman 

Page 111 · open in PDF

1
Macgilpin Brittany
From: Ziemnicki Ryan
Sent: Tuesday, June 9, 2026 1:27 PM
To: Macgilpin Brittany
Subject: FW: Written Public Comment to the Conservation Commission/Inland Wetlands & 
Watercourses Agency
From: Mary Anderson <maryanderson21200@gmail.com>  
Sent: Tuesday, June 9, 2026 1:17 PM 
To: Ziemnicki Ryan <rziemnicki@simsbury-ct.gov> 
Subject: Written Public Comment to the Conservation Commission/Inland Wetlands & Watercourses Agency 
Ryan, I am writing to provide my written public comment and ask that you put it in the public record today, June 9, 202 6. I agr ee with and have the same c oncer ns as the one s stated in the Notice of I nterventi on submitted by Christine Sinopoli. Pleas e cons  
Warning: Unusual sender <maryanderson21200@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
Ryan, I am writing to provide my written public comment and ask that you put it in the public record 
today, June 9, 2026. 
I agree with and have the same concerns as the ones stated in the Notice of Intervention submitted by 
Christine Sinopoli. 
Please consider fully evaluating the impact of the proposed development before the commission makes 
a decision on this project. 
It is the responsibility of the applicant to prove the stormwater mapping will not harm the wetlands.  Their 
review, thus far, does not provide evidence demonstrating the proposed activities will avoid 
unreasonable impairment of wetlands, water courses, groundwater resources, vernal pool systems, 
wildlife habitat, and associated ecological functions protected under Connecticut law.  
I am particularly concerned with the third-party review where there is a lack of information regarding 
hydrology (comment 24) which is fundamental to the commission’s decision.  
Thank you for your consideration. 
Mary Anderson 
57 Musket Trail Simsbury, CT 

Page 112 · open in PDF

1 
To:  Town of Simsbury, Connecticut, Conservation Commission/Inland Wetlands & 
Watercourses Agency 
From:  Christine Sinopoli, Intervenor 
Date:  June 9, 2026 
Members of the Town of Simsbury, Connecticut, Conservation Commission/Inland Wetlands & 
Watercourses Agency: 
Regarding Application No.:  CC 26-02, for The Ridge at Talcott Mountain South and the 
proposed 689-unit development at 200 Hopmeadow Street, my question is whether the applicant 
has met the burden required under Connecticut General Statutes §22a-41 and the Simsbury 
Inland Wetlands and Watercourses Regulations to demonstrate that the proposed regulated 
activities will not adversely affect wetlands, watercourses, and their associated ecological 
functions over the long term. 
Based upon the Town's third-party reviews prepared by CHA/EcoMaps dated May 4, 2026 and 
June 4, 2026, I respectfully submit that the current record may not yet contain sufficient evidence 
to support all findings required under §22a-41. 
First, and most significantly, Comment 24 raises concerns regarding wetland hydrology and 
function. While the application provides peak discharge calculations and compares flows at 
design points, the review notes the absence of a quantitative evaluation of how changes in 
stormwater routing, reduced direct discharge, and increased infiltration may affect individual 
wetland systems. Though the Wetland Impact Assessment states that careful consideration was 
given to wetland hydrology and that no impacts are expected, it does not appear that a 
quantitative analysis was performed regarding hydroperiod, seasonal groundwater interaction, or 
long-term wetland productivity for Wetlands 2, 4, 5, 6, and 7. 
While the reviewer ultimately marked Comment 24 as addressed, the response appears to rely 
primarily upon qualitative explanations rather than a quantitative evaluation of wetland 
hydroperiod, groundwater interaction, or long-term wetland function. The response explains why 
impacts are not expected, but it does not appear to include a quantitative hydroperiod analysis, 
groundwater interaction study, water-budget evaluation, or long-term monitoring data that would 
allow the Commission to independently verify that long-term wetland functions will be 
maintained. 
This distinction is important because wetlands are defined by hydrology. If hydrology changes, 
wetland function may change. Once hydrology is altered, restoration may be difficult, expensive, 
and in some cases impossible. Under §22a-41(a)(3), the Commission must consider the 
relationship between short-term impacts and the maintenance and enhancement of long-term 
wetland productivity. In my view, the current record does not clearly demonstrate that this 
standard has been satisfied with respect to these wetland systems. 

Page 113 · open in PDF

2 
Second, Comment 24 identifies Wetland 6 as a system that currently receives direct stormwater 
discharge and exhibits evidence of hydrologic influence from that discharge, including scour and 
flashy hydroperiod conditions. The application proposes to alter those inputs, yet I do not see a 
quantitative comparison of baseline and post-development hydrologic dependence on 
stormwater, groundwater, and precipitation. Without such a baseline functional assessment, the 
long-term effect of those changes remains uncertain. 
Third, Comments 30 and 35 identify concerns regarding the Invasive Species Management Plan, 
including reliance upon a 10 percent cover threshold and limited specificity regarding treatment 
frequency and spatial extent. The review notes the possibility that localized infestations could 
persist or expand into sensitive resource areas while still technically meeting the proposed 
performance standard. 
Fourth, Comment 18 identifies dependencies between early phases of development and 
stormwater infrastructure planned for later phases. The review notes that runoff from Phase 1 
drainage areas may ultimately rely upon treatment systems associated with Phase 7, creating 
uncertainty regarding interim stormwater management if future phases are delayed, modified, or 
not completed as anticipated. 
Fifth, Comments 11 and 12 note that certain elements of the stormwater system, including 
internal controls, maintenance features, and constructability details, are deferred to future 
construction-level design. As a result, the Commission's ability to evaluate long-term 
functionality, inspection access, and maintenance reliability is necessarily limited at this stage. 
My concern is not that the applicant has failed to propose improvements. The applicant has 
proposed restoration measures, buffer enhancements, and stormwater treatment improvements. 
My concern is that the Commission is being asked to conclude that long-term wetland functions 
will be preserved without quantitative evidence sufficient to support that finding. 
The Commission's responsibility is not merely to determine whether a project complies with 
current engineering standards. Under §22a-41, the Commission must determine whether the 
record supports findings that this multi-phase, 689-unit project, hydrologically connected to 
approximately 47 acres of wetlands and the Farmington River corridor, will not adversely affect 
wetlands and watercourses and that long-term wetland productivity has been adequately 
evaluated. Those findings should be supported by substantial evidence contained within the 
administrative record.
When uncertainty exists within the record, that uncertainty is a relevant consideration. 
Stormwater systems may not always perform as modeled. Maintenance practices may change 
over time. Invasive species management programs may not be fully implemented. Plantings may 
fail. Hydrologic assumptions may ultimately prove inaccurate. 
The consequences of an incorrect assumption regarding wetland hydrology may not be readily 
reversible and may become apparent only after project construction has occurred. Requiring 
additional quantitative analysis is a reasonable step toward reducing uncertainty and 
strengthening the evidentiary basis for any final decision. 

Page 114 · open in PDF

3 
The applicant's experts believe the project will function as intended. The Commission's 
reviewers have identified information supporting the applicant's position. However, several of 
the most significant conclusions regarding wetland hydrology, wetland function, invasive species 
management, and long-term system performance continue to appear to rely primarily upon 
qualitative assessments rather than measurable quantitative evaluation. 
Because this project is of extraordinary scale, because it is located adjacent to sensitive wetland 
resources and vernal pool systems, and because important conclusions regarding long-term 
wetland function continue to rest primarily upon qualitative assessments rather than quantitative 
evaluation, I respectfully submit that the current record may not yet contain sufficient evidence 
to support all findings required under CGS §22a-41. 
LONG-TERM PERFORMANCE, MONITORING AND CORRECTIVE ACTION 
In addition to the issues identified above, I respectfully submit that the Commission should 
consider whether the record contains sufficient information regarding the long-term performance 
and reliability of the proposed stormwater and environmental protection measures. 
Many of the conclusions presented in support of the application are necessarily predictive in 
nature and depend upon assumptions regarding hydrology, stormwater performance, ecological 
restoration, invasive species management, and long-term maintenance. 
Accordingly, I respectfully ask the Commission to consider whether the record contains 
sufficient information regarding post-construction monitoring, performance verification, and 
corrective-action mechanisms should actual site conditions differ materially from those predicted 
during the permitting process. 
Specifically, if post-construction monitoring reveals that wetland function, hydrology, 
stormwater performance, or ecological conditions differ materially from those predicted during 
permitting, what enforceable mechanism exists to identify, correct, and fund remediation of 
those impacts? 
Because some environmental impacts may not become apparent until years after construction is 
completed, the existence of effective monitoring, enforcement, and corrective-action procedures 
may be relevant to the Commission's evaluation of long-term wetland productivity and 
protection under CGS §22a-41. 
Long-Term Maintenance and Enforcement 
The proposed stormwater infrastructure and environmental mitigation measures will require 
inspection, maintenance, and periodic repair throughout the life of the development. The record 
should clearly identify: 
• Who will be responsible for long-term maintenance and inspection; 
• The inspection frequency and performance standards that will apply; 
• The enforcement mechanisms available if maintenance obligations are not met; and 

Page 115 · open in PDF

4 
• Whether adequate financial and institutional safeguards exist to ensure these responsibilities are 
fulfilled over time. 
Adaptive Monitoring and Corrective Action 
Again, many of the conclusions regarding wetland protection are predictive in nature. If actual 
site conditions differ from those anticipated by the design, it is important to understand: 
• What post-construction monitoring will occur; 
• What parameters will be monitored; 
• The duration of such monitoring; 
• What measurable thresholds would trigger corrective action; and 
• Who will be responsible for implementing and funding any necessary remediation. 
Wetland Function Versus Wetland Presence 
The continued existence of a mapped wetland does not necessarily demonstrate the continued 
preservation of wetland function. The record should provide sufficient evidence regarding the 
long-term maintenance of ecological functions, including: 
• Groundwater recharge; 
• Seasonal hydrologic patterns; 
• Wildlife habitat and connectivity; 
• Vernal pool function; 
• Nutrient processing; and 
• Other wetland-dependent ecological functions. 
Climate Resilience and Design Assumptions 
The Commission may also wish to consider whether the proposed stormwater infrastructure has 
been evaluated for resilience under rainfall and runoff conditions that exceed modeled 
assumptions and whether the record adequately addresses the sensitivity of the proposed systems 
to changing hydrologic conditions over time. 
These considerations are offered not as conclusions regarding project impacts, but as factors 
relevant to the Commission's evaluation of long-term wetland productivity and protection under 
CGS §22a-41. 
For all the aforementioned reasons, I respectfully request that the Commission either: 
(1) require the additional analyses and information necessary to resolve the outstanding issues 
identified in the record; or 
(2) if such information is not provided, deny the application based upon the absence of 
substantial evidence necessary to support the findings required under CGS §22a-41. 

Page 116 · open in PDF

5 
Please include this letter in the official administrative record. 
Thank you for your time and consideration. 
Respectfully, 
Christine Sinopoli 
christineds1213@yahoo.com

Page 117 · open in PDF

1
Macgilpin Brittany
From: Ziemnicki Ryan
Sent: Tuesday, June 9, 2026 3:58 PM
To: Macgilpin Brittany
Subject: FW: Opposition to Proposed Development at 200 Hopmeadow Street
From: E. Furey <evelynfurey@gmail.com>  
Sent: Tuesday, June 9, 2026 3:52 PM 
To: Ziemnicki Ryan <rziemnicki@simsbury-ct.gov> 
Subject: Opposition to Proposed Development at 200 Hopmeadow Street 
Town of Simsbury Conservation Commission / Inl and Wetl ands & W atercourses Com mission c/o Rya n Ziem nicki De ar Members of the Commi ssion, I am writing as a l ongtim e resident of Simsbury to express my opposition to the proposed devel opment at 2 00 Hopme adow  
Warning: Unusual sender <evelynfurey@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
Town of Simsbury Conservation Commission / Inland Wetlands & Watercourses Commission 
c/o Ryan Ziemnicki 
Dear Members of the Commission, 
I am writing as a longtime resident of Simsbury to express my opposition to the proposed development at 
200 Hopmeadow Street and to request that this letter be entered into the public record. 
My family has lived in Simsbury for decades, and we care deeply about the natural resources that make 
our town such a special place to live. The wetlands and surrounding natural areas at this site are 
valuable environmental resources that cannot be replaced once they are damaged or destroyed. 
Wetlands play a critical role in protecting water quality, supporting wildlife habitat, reducing flooding, 
replenishing groundwater, and maintaining the health of the broader ecosystem. These functions benefit 
not only the plants and animals that depend on them, but also the residents of Simsbury who rely on 
clean water and a healthy environment. The potential impacts associated with more than 680 proposed 
housing units raise serious concerns about the long-term effects on these resources. 
I urge the Commission to carefully consider its responsibility to protect Simsbury's wetlands and 
watercourses and to fully evaluate the environmental impacts of this proposal. Development pressures 
should not outweigh the importance of preserving natural resources that provide lasting benefits to 
current and future generations. 
Connecticut's Inland Wetlands and Watercourses Act recognizes that wetlands and watercourses are an 
indispensable and fragile natural resource with significant environmental, ecological, and public health 
value. The Act charges local Inland Wetlands Commissions with protecting these resources from 
unnecessary degradation and with carefully evaluating the environmental impacts of proposed activities. 
I respectfully ask the Commission to fully exercise its authority and obligations under state law by 

Page 118 · open in PDF

2
thoroughly examining the direct, indirect, and cumulative impacts of this proposal, considering feasible 
and prudent alternatives, and ensuring that the long-term functions and benefits of these wetlands are 
protected for future generations. 
As residents, I believe our voices should be heard in decisions that will permanently affect the character 
and environmental health of our community. I respectfully ask the Commission to prioritize the 
protection of wetlands and other sensitive environmental resources when reviewing this application. 
Thank you for your time and consideration of these concerns. Please include this letter in the public 
record for this matter. 
~Evelyn Furey 
Simsbury Resident 

Page 119 · open in PDF

1
Macgilpin Brittany
From: Ziemnicki Ryan
Sent: Wednesday, June 10, 2026 8:39 AM
To: Macgilpin Brittany
Subject: FW: 200 Hopmeadow proposed development
From: Robert Sanders <boblynk@gmail.com>  
Sent: Tuesday, June 9, 2026 5:10 PM 
To: Ziemnicki Ryan <rziemnicki@simsbury-ct.gov> 
Subject: 200 Hopmeadow proposed development 
Dear CCIW&W Commisi on, No doubt all on the com mision have read Aldo Le opolds, 'Sand County Almanac' .  It's not easy for a tow n to stop developers fr om developi ng whe n they have met certai n criteria and own the la nd even if a tow n, it  
Warning: Unusual sender <boblynk@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
Dear CCIW&W Commision, 
No doubt all on the commision have read Aldo Leopolds, 'Sand County Almanac'.  It's not easy for a town 
to stop developers from developing when they have met certain criteria and own the land even if a town, 
it's land, habitant and wildlife and quality of life would suffer dramatically  from a developement this 
size    
Please use what power you have to restrict or stop the proposed developement.  Maybe reread Sand 
County Amanac? 
Respectfully,  
Robert Sanders 
203 Bushy Hill Rd 
Simsbury, Ct 06070 
boblynk@gmail.com

Page 120 · open in PDF

1
Macgilpin Brittany
From: Ziemnicki Ryan
Sent: Tuesday, June 9, 2026 4:17 PM
To: Macgilpin Brittany
Subject: FW: APPLICATION NO. CC 26-02
From: Matthew Grande <bugglesski@gmail.com>  
Sent: Tuesday, June 9, 2026 4:10 PM 
To: Ziemnicki Ryan <rziemnicki@simsbury-ct.gov> 
Subject: APPLICATION NO. CC 26-02 
BEFOR E THE TOWN OF SIMSB URY CONSERVATION COMMISSION/INLAND WETLANDS AND WATERCOURSES AGENCY APPLICATION NO. CC 26-02 2 00 H opmeadow Street (Hartford South) SL Simsbury LLC For submission into the public record: Simsbury Conservation Committee, His tory is our most va  
Warning: Unusual sender <bugglesski@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
BEFORE THE TOWN OF SIMSBURY 
CONSERVATION COMMISSION/INLAND WETLANDS AND WATERCOURSES AGENCY 
APPLICATION NO. CC 26-02 
200 Hopmeadow Street (Hartford South) 
SL Simsbury LLC 
For submission into the public record: 
Simsbury Conservation Committee, 
History is our most valuable instructor. The history of 8-30g in Simsbury is a muddy pit on Hopmeadow St. 
owned by Vessel Technologies, who may or may not, ever complete their project. It offers nothing for 
Simsbury other than additional runoff into the Farmington. It offers nothing for the bear I had to wait for to 
cross into the property from the low area near the entrance to The Powder Forest before the fence went up. 
Was he looking for some skunk cabbage to munch or a turtle's nest to raid? He won't find them there now. For 
the any housing at all cost advocates, I would ask about the 23000 of us sitting in our cars longer to get 
anywhere, burning more gas than we used to and helping burn down the planet faster as a result, what is 
more important, some ill advised housing now or, our sustainability as a species long-term? Anything we 
spend on legal fees now is worth mitigating the long-term damage this project will do to Simsbury. Use Vessel 
as an example of an insufficient vetting and bonding process in 8-30g itself and send the whole mess back to 
the state suggesting home rule unless and until 8-30g can prevent a repeat of the mud pit it has already left us 
with. I'll close by paraphrasing Lincoln's first inaugural address, (This town, with its institutions, belongs to the 
people who inhabit it.) Well, I live here, have for 21 years, and almost never miss a vote. You, as a body, are 
among the town's institutions. I am encouraging you in the strongest possible terms to prevent the damage to 
this parcel and this town that will be brought with this project.  
Respectfully, 
Matthew Grande  
89 Stratton Forest Way 

Page 121 · open in PDF

1
Macgilpin Brittany
From: Ellen Gilbert <esgbsrn@gmail.com>
Sent: Tuesday, June 9, 2026 4:37 PM
To: Macgilpin Brittany
Subject: Conservation/ Inland Wetlands and Watercourses Public Comment June 9,2026
Warning: Unusual sender <esgbsrn@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
Good afternoon Brittany, 
Please share this statement with the Conservation/ Inland Wetlands 
and Watercourses Agency and Zoning Board,
Good evening commissioners and Simsbury staff, petitioners and public. The Ridge at 
Talcott Mountain South is a deeply complex and controversial 
proposal. I am pleased to see the project footprint is actually smaller 
than The Hartford had and the berm and plant life between Talcott 
Acres Condominium Association and The Ridge will remain 
undisturbed. The overall impact of this project on the environment is 
still a loose-loose situation.The scientists and engineers have 
evaluated the wetlands, vernal pools, stormwater management, 
amphibians, and flora. If all the plans went exactly as written on 
paper, perhaps the environmental impact would be limited. A combat 
copter pilot once told me to "always prepare for it to not go as 
planned." We need to look at the big picture. The Silverman group 
is using Statute 8-30g to get their way of development regardless of 
the overall effect on the 124 acres of our town. The application 
CC#26-02 plans for 689 rentals but in my estimation there are 
nowhere near that many interested renters. The town already has 
many vacant rentals. The town will loose precious woodlands 
adjacent to Hopmeadow Street. There will be pollution risk so close to 
Minister Brook, the Farmington River and the Vernal Pools. There is no 
guarantee of protection. The ability of Aquarion and The Water 
Pollution Control Authority to manage the demand are unknown. I 

Page 122 · open in PDF

2
made calls to both offices. I could not get a figure on the water 
consumption by The Hartford Insurance Company but the facility had 
1500 employees working days and evenings on weekdays. The 689 
households will create a demand far greater. Consider cooking, 
dishwashing, laundry, bathing, hygiene needs and toilet use, with an 
occupation of 1-2 people or 3-5 people in those units. The aquifer is 
directly across the river from the proposed development. Our climate 
is unpredictable.
The Multi-use Hartford Form-Based Plan could result in a reduction in 
that water demand. Commercial aspects could replace the income of 
too many rental residences. Rather than a restaurant and hidden strip 
mall, I propose the following:
 Please include housing tailored for Seniors and units designated 
for Accessible Housing. Section 8-11-Supportive Housing for 
People with Disabilities.
 Sprouts Grocery Store. This is the latest concept in grocery 
stores and is in many states. They plan to bring 8 to Connecticut 
and one is already approved for Fairfield.
 Chick-fil-a
 Breakfast/Lunch dining for residents, sports teams, bicyclists, 
walkers.
We need to preserve our natural beauty. Keep as many trees as possible on the property. 
Plan for greater protection of our wetlands and watercourses. 
I ask that the plan needs to be scaled back and adjusted to better preserve what is good for 
the future users of the land and for us.
Thank you to all the many professionals who have worked on this plan, for the people who 
have reviewed it, volunteers who have taken their time to consider this and to the public who 
have expressed their caring. Let's make this a WIN-WIN.
Sincerely,
Ellen S Gilbert
esgbsrn@gmail.com

Page 123 · open in PDF

1
Macgilpin Brittany
From: Aanya Mehta <aanyasmehta@gmail.com>
Sent: Tuesday, June 9, 2026 5:33 PM
To: Ziemnicki Ryan; Macgilpin Brittany
Subject: Fwd: Public Comment regarding Opposition to Application CC #26-02
Warning: Unusual sender <aanyasmehta@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
---------- Forwarded message --------- 
From: Aanya Mehta <aanyasmehta@gmail.com> 
Date: Tue, Jun 9, 2026 at 5:30 PM 
Subject: Public Comment regarding Opposition to Application CC #26-02 
To: <rziemnicki@simsbury-ct.gov> 
Cc: Dad <sonnynmehta@hotmail.com>, Mom <awanimehta@yahoo.com>, Uma Mehta 
<usmehta00@gmail.com> 
Dear Members of the Town of Simsbury, Conservation Commission / Inland Wetlands & Watercourses 
Agency, 
I am writing to express my strong opposition to the Hopmeadow Street Development Application and to 
implore the Commission to vote against this proposal. As a lifelong resident of Simsbury, I have been 
able to enjoy the natural beauty of our town’s ecology for nearly twenty-four years. In fact, to me, growing 
up in Simsbury is characterized by our connection to nature and deep appreciation for our environment. 
The Farmington River is an active part of our community, a pristine site that supports not just our natural 
environment, but our culture— the places we hang out in the summer, the views we see, and the smells 
we enjoy walking alongside it. Our healthy wetlands support our wildlife and the greenery we love to take 
pictures of and associate with our town’s charm. 
As a young professional, I chose to stay in the greater Hartford area post-graduation because I love our 
town and for so long, we have done a great job of preserving and maintaining our natural culture. I cannot 
enjoy these things in Boston or New York or, frankly, Fairfield County, where overdevelopment and 
overcrowding have neglected conservation priorities. If our town were to accept this project, we would 
meet the same fate. With developments arising in the City of Hartford and rising costs of living, there 
would not be so much of a draw for young people to come to or stay in our town. And, once lost, our 
natural beauty and serenity cannot easily be restored; our community would be irrevocably damaged. I 
hope to enjoy many more years as a resident of Simsbury, hopefully building my own life here. As such, I 
strongly urge the Commission to prioritize the stewardship of our town’s wetlands and watercourses and 
to reject the current proposal. Thank you for your consideration.  
Sincerely, 

Page 124 · open in PDF

2
Aanya Mehta, Lifelong Simsbury Resident 
42 Banks Rd, Simsbury CT 06070 

Page 125 · open in PDF

1
Macgilpin Brittany
From: Leslie Kosswig <leslie_kosswig@hotmail.com>
Sent: Tuesday, June 9, 2026 8:08 PM
To: Macgilpin Brittany
Subject: Simsbury CT Wetlands Committee Meeting 6/9
Warning: Unusual sender <leslie_kosswig@hotmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
Hi Brittany, 
Would it be possible to add this to the public comment record for tonight’s meeting? I was signed up to 
speak but I had to leave before i had an opportunity. I appreciate all you do.  
While the developer emphasizes that the physical footprint is smaller by 2 acres, the increase from 449 to 
689 units represents a substantial increase in residential density. More residents mean more vehicles, 
more traffic, greater water consumption, increased wastewater generation, and significantly more 
garbage and solid waste. A larger population also produces more litter, pet waste, fertilizers, and 
household pollutants that can enter stormwater systems and ultimately affect nearby wetlands. 
Increased waste generation requires more frequent trash collection and service vehicle traffic, creating 
additional noise, emissions, and opportunities for litter to be dispersed by wind, wildlife, or stormwater 
runoff. Even when properly managed, a development of this size places greater long-term pressure on the 
surrounding environment than a smaller development. 
Wetlands are affected not only by the direct loss of acreage but also by cumulative impacts from 
increased human activity. More residents can result in greater disturbance to wildlife, more recreational 
use of buffer areas and higher volumes of runoff carrying pollutants into sensitive wetland ecosystems. 
The intensity of use should be considered alongside the project’s footprint when evaluating the overall 
environmental impact. 
Thank you so much, 
Leslie Kosswig
8607519461
14 Lincoln Lane
Weatogue, CT 06089

Page 126 · open in PDF

1
Macgilpin Brittany
From: Ziemnicki Ryan
Sent: Wednesday, June 10, 2026 8:47 AM
To: Macgilpin Brittany
Subject: FW: 200 Hopmeadow Street Proposal
From: Diana Bittern <deltabird@gmail.com>  
Sent: Tuesday, June 9, 2026 7:48 PM 
To: Ziemnicki Ryan <rziemnicki@simsbury-ct.gov> 
Subject: 200 Hopmeadow Street Proposal 
Town of Simsbury, CT Conservation Commi ssion/Inland Wetlands and Water courses c/ o Ryan Ziemni cki Dear Members : I oppose the developme nt of 689 housi ng units at 200 Hopm eadow Street.  The parcel includes approximately 47 a cres of wetla nds, whi ch are an import  
Warning: Unusual sender <deltabird@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
Town of Simsbury, CT 
Conservation Commission/Inland Wetlands and Watercourses 
c/o Ryan Ziemnicki 
Dear Members: 
I oppose the development of 689 housing units at 200 Hopmeadow Street.  The parcel includes 
approximately 47 acres of wetlands, which are an important and irreplaceable natural resource. As has 
been noted, our wetlands play a critical role in flood control, groundwater recharge, water purification, 
erosion prevention, and especially, the preservation of wildlife habitat. Once disturbed or lost, these 
functions are often difficult or impossible to fully restore. 
Given the scale of the proposed 689-unit development and the environmental significance of the site, I 
respectfully request that the Commission conduct a thorough review of all potential impacts to the 
wetlands and watercourses and carefully consider whether adequate protections can be assured. 
Thank you for your service and for your careful consideration of this matter. I respectfully request that 
this letter be included in the public record 
Sincerely, 
--  
Diana Bittern 
5 Mountain View Drive 
Weatogue, CT 06089 
551-482-6161 

Page 127 · open in PDF

1
Macgilpin Brittany
From: Jordan Brady <jordan.brady3@gmail.com>
Sent: Tuesday, June 9, 2026 4:22 PM
To: Ziemnicki Ryan; Macgilpin Brittany
Subject: Public Comment for June 9 Meeting - Opposition to 200 Hopmeadow St. Proposal
Warning: Unusual sender <jordan.brady3@gmail.com>  
You don't usually receive emails from this address. Make sure you trust this sender before taking any actions.  
Dear Members of the Simsbury Conservation Commission / Inland Wetlands & Watercourses Agency, 
Please accept this email as my official written public comment regarding the proposal for 689 units at 
200 Hopmeadow Street. I request that this statement be formally read into the public record for tonight’s 
meeting, Tuesday, June 9th. 
Because I am unable to attend the meeting in person tonight, I am submitting my concerns regarding the 
scale of this development and its potential impact on our town's natural resources. The parcel in 
question contains 47 acres of wetlands, an irreplaceable, fragile ecosystem that Simsbury cannot afford 
to compromise. 
I urge the Commission to consider the critical functions these specific wetlands provide to our 
community: 
 Water Supply & Quality: These wetlands are essential to maintaining an adequate supply of both 
surface and underground water, as well as recharging and purifying our groundwater. 
 Flood & Erosion Control: This land provides vital hydrological stability, serving as a natural 
defense against flooding and erosion for the surrounding areas. 
 Biodiversity: This habitat is crucial to the existence of diverse animal, aquatic, and plant life 
unique to our region. 
Too many inland wetlands and watercourses across Connecticut have already been irreversibly 
destroyed or face imminent danger. As stewards of Simsbury’s environment, it is the Commission's duty 
to ensure this does not happen to our town. 
An oversized development of 689 units on a delicate 47-acre wetland parcel poses an unacceptable risk 
to our ecological infrastructure and hydrological safety. I strongly urge the Commission to reject the 
proposal in its current form and prioritize the long-term protection of Simsbury’s natural resources. 
I will finish with this. I am a young parent, with kids ages 2 and 5 (unable to attend the meeting because I 
am currently at home with them and my wife is working). We moved to Simsbury in August of last year, 
and a major reason we decided on this town is because of the natural beauty and the access to nature. 
My wife and I are looking forward to decades more time enjoying this town and raising our kids with such 
amazing access to the outdoors.  
Thank you for your time, your service, and your serious consideration of this matter! 

Page 128 · open in PDF

2
Cheers, 
Jordan and Kendra Brady 
21 Wyngate 
401-225-7126  

Minutes: archived copy, SHA-256 bc0711281398…. Agenda: archived copy, SHA-256 9c1d58b88879…. Packet: archived copy, SHA-256 70e7e484024d….