CT Public Docs Tracker

Towns / Granby / Public Building and Capital Project Committee / Jul 8, 2026

Public Building and Capital Project Committee, Jul 8, 2026

Granby minutes posted

Documents

TypeDocumentPagesOpen
minutes Public Building & Capital Project Committee Regular Meeting Minutes 2 PDF download · town site
agenda Public Building & Capital Project Committee Regular Meeting 2 PDF download · town site
packet Public Building & Capital Project Committee Regular Meeting (packet)
Not attached: this packet is 38 MB, too large to host here. Use the town site link.
195 town site

Summary of the minutes

AI-generated summary. Each line links to the PDF page it came from; check it before relying on it.

Read the official minutes (PDF, 2 pages) The PDF is the record; this summary is a guide to it.

At its first regular meeting, the committee elected Mark Neumann as chairman and Anne Adamson as vice-chairman, and voted to follow Robert's Rules of Order and adopt a meeting schedule. The committee deferred discussion of the library, Salmon Brook Park and sewer pump projects, and it will review engineering firm RFP responses at its next meeting.

Decisions (5) · all reported votes

  1. Election of Chair
    Mark Neumann elected chairman by unanimous vote after nomination
    p. 1
  2. Election of Vice Chair
    Anne Adamson elected vice-chairman by unanimous vote after nomination
    p. 1
  3. Adopt Robert's Rules of Order
    Committee voted to conduct its meetings in accordance with Robert's Rules of Order
    Vote: Motion by M. Gottlieb, seconded by M. Lengvarsky, carried 8-0-0 · p. 1
  4. Adopt meeting schedule
    Committee adopted the meeting schedule submitted to the Town clerk and will meet regularly on the second Wednesday of each month
    Vote: Motion by A. Adamson, seconded by W. Pascucci, carried 8-0-0 · p. 1
  5. Adjournment
    Committee voted to adjourn the meeting at 7:56 p.m.
    Vote: Motion by K. McCord, seconded by A. Adamson, carried 8-0-0 · p. 2

Also discussed (5)

  • Secretary position: No nominations were made for secretary; no action recorded · p. 1
  • Granby Public Library Renovation and Expansion Project: Discussion deferred to a future meeting · p. 1
  • Salmon Brook Park Pickleball Courts and Year-Round Bathroom Project: Discussion deferred to a future meeting · p. 2
  • Sewer Pump Maintenance Project: Discussion deferred to a future meeting · p. 2
  • Engineering RFP responses: Responses to the Request for Proposal for an engineering firm will be shared and discussed at the next meeting · p. 2
Summary of the agenda: Public Building & Capital Project Committee Regular Meeting

AI-generated summary.

This is the agenda for the Granby Public Building & Capital Project Committee's July 8, 2026 regular meeting at the Senior Center. It lists organizational items, a discussion of bond referendum questions, and overviews of several capital projects.

On the agenda (11)

  1. Elect Chair, Vice Chair And Secretary · p. 1
  2. Adopt Roberts Rules · p. 1
  3. Adopt Meeting Schedule · p. 1
  4. Discussion On Bond Referendum Questions, Proceedings & Process · p. 1
  5. Overview of Granby Public Library Renovation And Expansion Project · p. 1
  6. Overview of Granby Memorial Middle School Repairs And Design/Scoping Work Project · p. 1
  7. Overview of High School Baseball/Softball Fields · p. 1
  8. Overview of High School Stadium Field, Track And Field Two · p. 2
  9. Overview of Salmon Brook Park Pickleball Courts And Year-Round Bathroom Project · p. 2
  10. Overview of Sewer Pump Maintenance Project · p. 2
  11. Discussion Of Action Items For The Next Meeting, including Engineering RFP Issued And Responses Will Be Shared · p. 2

This PDF is a scan; its text was read by OCR and may contain errors.

Full text of the documents

View the minutes PDF on this page (Public Building & Capital Project Committee Regular Meeting Minutes) Open the PDF
Text of the minutes (Public Building & Capital Project Committee Regular Meeting Minutes, 2 pages)

Page 1 · open in PDF

TOWN OF GRANBY 
PUBLIC BUILDING & CAPITAL PROJECT COMMITTEE 
REGULAR MEETING MINUTES 
JULY 8, 2026 
 
PRESENT: Anne Adamson, Peter Anderson, Mark Gottlieb, Christopher Lavigne, Michael 
Lengvarsky, Kent McCord, Mark Neumann, and William Pascucci 
 
ALSO PRESENT: Cheri Burke, Superintendent of Schools and Mike Walsh, Town Manager  
 
ABSENT: David Peling 
 
1. PLEDGE OF ALLEGIANCE 
 
2. INTRODUCTION OF MEMBERS AND OPENING REMARKS 
The members of the committee were introduced, and First Selectman Mark Fiorentino 
welcomed the group and thanked them for their willingness to serve on the committee. 
 
3. ELECT CHAIR, VICE CHAIR AND SECRETARY 
Mark Neumann was nominated to serve as chairman. There being no further nominations, 
nominations were closed. By unanimous vote, Mark Neumann was elected chairman. 
 
Anne Adamson was nominated to serve as vice- chairman. There being no further 
nominations, nominations were closed. By unanimous vote, Anne Adamson was elected vice-
chairman. 
 
There were no nominations for the position of secretary. 
 
4. ADOPT ROBERTS RULES 
ON A MOTION by M. Gottlieb, seconded by  M. Lengvarsky, the committee voted (8-0-0) to 
conduct its meetings in accordance with Robert’s Rules of Order. 
 
5. ADOPT MEETING SCHEDULE 
ON A MOTION by A. Adamson, seconded by  W. Pascucci, the committee voted (8-0-0) to 
adopt the meeting schedule submitted to the Town clerk and meet regularly on the second 
Wednesday of each month. 
 
6. DISCUSSION ON BOND REFERENDUM QUESTIONS, PROCEEDINGS & PROCESS 
Town Manager Walsh provided an overview of the charge of the committee and the bonding 
process. 
 
7. OVERVIEW OF INDVIDUAL PROJECTS 
7.I. Granby Public Library Renovation and Expansion Project 
Discussion of the library project was deferred to a future meeting. 
 
7.II. Granby Memorial Middle School Repairs and Design/Scoping Work Project 
Superintendent Burke and Christopher Degray, BOE Director of Facilities presented an 
overview of the middle school project and the high school athletic fields project. 
 

Page 2 · open in PDF

PBCPC Minutes 
7/8/26 
Page 2 
  
7.III. High School Baseball/Softball Fields 
This agenda item was incorporated into the discussion of agenda item 7.II. 
 
7.IV. High School Stadium Field, Track, and Field Two 
This agenda item was incorporated into the discussion of agenda item 7.II. 
 
7.V. Salmon Brook Park Pickleball Courts and Year-Round Bathroom Project 
Discussion of the Salmon Brook Park projects was deferred to a future meeting. 
 
7.VI. Sewer Pump Maintenance Project 
Discussion of the sewer pump project was deferred to a future meeting. 
 
8. DISCUSSION OF ACTION ITEMS FOR NEXT MEETING 
8.I. Engineering RFP Issued and Responses Shared 
Responses to the Request for Proposal for an engineering firm will be shared and 
discussed at the next meeting. 
  
9. ADJOURNMENT: 
ON A MOTION by  K. McCord, seconded by  A. Adamson, the committee voted (8-0-0) to 
adjourn the meeting at 7:56 p.m. 
 
 
 
 
Respectfully submitted,  
 
Betsy Mazzotta 
Recording Secretary 
View the agenda PDF on this page (Public Building & Capital Project Committee Regular Meeting) Open the PDF
Text read from the scanned agenda (OCR) (Public Building & Capital Project Committee Regular Meeting, 2 pages)

Page 1 · open in PDF

Join Zoom Meeting

https://us06web.zoom.us/j/89187529615?pwd=Q6phqjlQtm8glsbn9asLmaavcSMqjP.1

Meeting ID: 891 8752 9615

Passcode: 244287

TOWN OF GRANBY
Public Building & Capital Project Committee
Regular Meeting Agenda
Wednesday, July 8, 2026 – 6 p.m.

Senior Center

1. Pledge Of Allegiance
2. Introduction Of Members And Opening Remarks - First Selectman Mark Fiorentino

Documents:

2 PUBLIC BUILDING AND CAPITAL PROJECT COMMITTEE.PDF

3. Elect Chair, Vice Chair And Secretary
4. Adopt Roberts Rules
5. Adopt Meeting Schedule
6. Discussion On Bond Referendum Questions, Proceedings & Process

Documents:

6 DRUMMER MAY 2026.PDF

7. Overview Of Individual Projects

7.I. Granby Public Library Renovation And Expansion Project

7.II. Granby Memorial Middle School Repairs And Design/Scoping Work Project

Documents:

7.2 GRANBY MEMORIAL MIDDLE SCHOOL REPAIRS AND DESIGN
SCOPING WORK PROJECT.PDF

7.III. High School Baseball/Softball Fields

Documents:

7.3 GRANBY-PROPOSAL---BASEBALL-MULTIPURPOSE-FIELD.PDF

7.IV. High School Stadium Field, Track And Field Two

Documents:

Page 2 · open in PDF

7.4 HIGH SCHOOL STADIUM FIELD, TRACK, AND FIELD TWO.PDF

7.V. Salmon Brook Park Pickleball Courts And Year-Round Bathroom Project
7.VI. Sewer Pump Maintenance Project
8. Discussion Of Action Items For The Next Meeting
8.I. Engineering RFP Issued And Responses Will Be Shared
9. Adjournment

The next regular meeting of the Public Building & Capital Project Committee is scheduled for Wednesday, August 12, 2026, at 6 p.m. at the Senior Center.
Text of the packet (Public Building & Capital Project Committee Regular Meeting (packet), 195 pages)

Page 1

Join Zoom Meeting
https://us06web.zoom.us/j/89187529615?pwd=Q6phqjIQtm8glsbn9asLmaavcSMqjP.1
Meeting ID: 891 8752 9615
Passcode: 244287
TOWN OF GRANBY
Public Building & Capital Project Committee
Regular Meeting Agenda
Wednesday, July 8, 2026 – 6 p.m.
 Senior Center
Pledge Of Allegiance
Introduction Of Members And Opening Remarks - First Selectman Mark Fiorentino
2 PUBLIC BUILDING AND CAPITAL PROJECT COMMITTEE.PDF
Elect Chair, Vice Chair And Secretary
Adopt Roberts Rules
Adopt Meeting Schedule
Discussion On Bond Referendum Questions, Proceedings & Process
6 DRUMMER MAY 2026.PDF
Overview Of Individual Projects
Granby Public Library Renovation And Expansion Project
Granby Memorial Middle School Repairs And Design/Scoping Work Project
7.2 GRANBY MEMORIAL MIDDLE SCHOOL REPAIRS AND DESIGN 
SCOPING WORK PROJECT.PDF
High School Baseball/Softball Fields
7.3 GRANBY-PROPOSAL---BASEBALL-MULTIPURPOSE-FIELD.PDF
High School Stadium Field, Track And Field Two
7.4 HIGH SCHOOL STADIUM FIELD, TRACK, AND FIELD TWO.PDF
Salmon Brook Park Pickleball Courts And Year-Round Bathroom Project
Sewer Pump Maintenance Project
Discussion Of Action Items For The Next Meeting
Engineering RFP Issued And Responses Will Be Shared
Adjournment
The next regular meeting of the Public Building & Capital Project Committee is 
scheduled for Wednesday, August 12, 2026, at 6 p.m. at the Senior Center.
1.
2.
Documents:
3.
4.
5.
6.
Documents:
7.
7.I.
7.II.
Documents:
7.III.
Documents:
7.IV.
Documents:
7.V.
7.VI.
8.
8.I.
9.

Page 2

Join Zoom Meeting
https://us06web.zoom.us/j/89187529615?pwd=Q6phqjIQtm8glsbn9asLmaavcSMqjP.1
Meeting ID: 891 8752 9615
Passcode: 244287
TOWN OF GRANBY
Public Building & Capital Project Committee
Regular Meeting Agenda
Wednesday, July 8, 2026 – 6 p.m.
 Senior Center
Pledge Of Allegiance
Introduction Of Members And Opening Remarks - First Selectman Mark Fiorentino
2 PUBLIC BUILDING AND CAPITAL PROJECT COMMITTEE.PDF
Elect Chair, Vice Chair And Secretary
Adopt Roberts Rules
Adopt Meeting Schedule
Discussion On Bond Referendum Questions, Proceedings & Process
6 DRUMMER MAY 2026.PDF
Overview Of Individual Projects
Granby Public Library Renovation And Expansion Project
Granby Memorial Middle School Repairs And Design/Scoping Work Project
7.2 GRANBY MEMORIAL MIDDLE SCHOOL REPAIRS AND DESIGN 
SCOPING WORK PROJECT.PDF
High School Baseball/Softball Fields
7.3 GRANBY-PROPOSAL---BASEBALL-MULTIPURPOSE-FIELD.PDF
High School Stadium Field, Track And Field Two
7.4 HIGH SCHOOL STADIUM FIELD, TRACK, AND FIELD TWO.PDF
Salmon Brook Park Pickleball Courts And Year-Round Bathroom Project
Sewer Pump Maintenance Project
Discussion Of Action Items For The Next Meeting
Engineering RFP Issued And Responses Will Be Shared
Adjournment
The next regular meeting of the Public Building & Capital Project Committee is 
scheduled for Wednesday, August 12, 2026, at 6 p.m. at the Senior Center.
1.
2.
Documents:
3.
4.
5.
6.
Documents:
7.
7.I.
7.II.
Documents:
7.III.
Documents:
7.IV.
Documents:
7.V.
7.VI.
8.
8.I.
9.

Page 3

PUBLIC BUILDING AND CAPITAL PROJECT COMMITTEE 
 
The PBCPC shall: 
1. Review architectural drawings, contracts, bids, specifications, and other related 
documents of any construction or renovation of any town-owned building or 
reconstruction project (excluding the annual Road Improvement Project) exceeding 
$250,000. 
2. Monitor the progress of any such construction or renovation and make recommendations 
to the Board of Selectmen  as appropriate; and 
3. Determine when such construction or renovation is complete. 
 
The PBCPC shall consist of seven members as follows: 
• Six members of the public with at least one member with construction industry 
experience and at least one member having financial experience 
• One member from the Board of Selectmen (BOS) 
• One member from the Board of Education (BOE) 
• One member from the Board of Finance (BOF) 
• Superintendent of Schools (ex-officio) 
• Town Manager (ex-officio) 
 
Members (all terms expire 1/13/32) 
Anne Adamson 
Peter Anderson 
Mark Gottlieb 
Christopher Lavigne 
Michael Lengvarsky 
Kent McCord (Board of Finance) 
Mark Newman (Board of Selectmen) 
William Pascucci 
David Peling (Board of Education) 
 
 
Ex-officio Members 
Cheri Burke (Superintendent of Schools) 
Mike Walsh (Town Manager) 

Page 4

 
How Granby Bonds Capital Projects 
 
Back in October of 2025, I wrote a story for the Drummer explaining how Granby is a town that 
practices “direct democracy”.  Direct democracy means you, the voters, through the ballot box, 
choose your elected officials , approve the Town’s annual budget, and periodically, are asked to 
go to the polls to approve spending and funding for large capital  projects.  The process where 
voters approve spending and funding for large capital projects is called “bonding”.   
 
Simply put, bonding is borrowing for a municipal capital project  costing over $250,000, similar to 
what a resident would do when buying a home, they would take out a mortgage.   
 
Granby bonds (issues debt) for 20 years on a tax -exempt basis and in such a way as any  new 
debt replaces older, paid off/retired debt.  To say it another way , taxes that property owners pay 
annually to the town pay for debt service on the bonds and that borrowing is done in such a way 
so that taxes are not increased by the new debt, through at least 2032.   
 
This financial technique is called “debt replacement stabilization” and is practiced by the Town 
of Granby and is an example of just one of the many fiscally prudent fiscal practices that other 
towns would do well to emulate.   
 
The Granby Charter prescribed bonding p rocess that will unfold in the coming months starts 
with Board of Selectmen approval, then Board of Finance approval, then an Open House for Q 
and A, then a Town Meeting, and then the voters will make the final decision on each question 
at a bonding referendum vote on September 22, 2026 at Town Hall from 8 a.m. to 8 p.m.   
 
The draft questions were presented to the Board of Selectmen on May 4 th.  They will edit the 
questions in the coming weeks for eventually voter consideration.  The questions are as follows: 
 
1. Appropriation and Bond Authorization not to exceed $3,520,000 for the Baseball/Softball 
Fields at the High School Complex Project 
 
2. Appropriation and Bond Authorization not to exceed $6,930,000 for Stadium Field, Track, 
and Field Two at the High School Complex Project 
 
3. Appropriation and Bond Authorization not to exceed $3,000,000 for the Granby Memorial 
Middle School Repairs and Design/Scoping Work Project 
 
4. Appropriation and Bond Authorization not to exceed $500,000 for Salmon Brook Park 
Pickleball Courts and Year-Round Bathroom Project 
 
5. Appropriation in an Amount not to exceed $12,000,000 for the Granby Public Library 
Renovation and Expansion Project and Bond Authorization in an Amount Not to Exceed 
$6,000,000 to Fund a Portion of the Appropriation with the Balance of the Appropriation 
to be Funded by Private Contributions and Grants 
 
6. Appropriation and Bond Authorization not to exceed $1,500,000 for Sewer Pumps 
Maintenance Project 
 
Hopefully, the narrative I’ve produced above gives you an understanding of the capital 
prioritization and funding process that is now underway  for which you have direct input and 
approval over.   
 
If you have any questions on the information presented here, please reach out to me at 860-
844-5302 or Mwalsh@Granby-CT.Gov as I always welcome the opportunity to discuss Town 
issues. 

Page 5

2026 Granby MS Facility Condition Assessment (FCA) 
SUMMARY OF FINDINGS 
Granby Memorial Middle School 
Abbrev Building Name: 
Est. Gross Area (SF): 
Year Constructed: 
Major Renovation: 
Date Assessed: 
Granby MS 
73,406 
1992 
None 
Week of 02/16/2025 
Report Date: 6/19/2026 REV 
Address 321 Salmon Brook Road  
Granby, CT 06035 
83% 
Priority  Estimated Assmt Cost % of Need
Priority 1 - Within 1 Year 4,513,115$             16.4%
Priority 2 - Within 3 Years 12,622,784$           46.0%
Priority 3 - Within 5 Years 5,507,012$             20.1%
Priority 4 - Within 10 Years 4,805,201$             17.5%
27,448,112$           100%
10 YEAR FORECAST BY PRIORITY
System Category  Subtotal % of Need % of Need (Graphic)
Bldg Envelope & Structure 1,318,992$             4.8%
Arch Interiors & Finishes 5,226,733$             19.0%
Elevators & Lifts 175,149$                0.6%
Mechanical & Plumbing 7,603,247$             27.7%
Fire Alarm & Protection 1,256,349$             4.6%
Electrical, Tech & Security 6,805,852$             24.8%
Site Improvements 5,061,790$             18.4%
27,448,112$           100%
10 YEAR FORECAST BY SYSTEM

Page 6

Architectural Systems 
Granby Middle School is a 1 and 2-story structure with no 
basement and no mechanical penthouse that is 
approximately 73,406 square feet. The building was 
constructed in 1992 with minor renovations to interior 
finishes and no additions. 
The building is constructed with steel framing and concrete 
floors. The roof assembly includes flat roof areas with a 
membrane on metal deck as well as pitched, standing seam metal roof areas. The exterior wall 
finish is brick veneer. There is no visible evidence of significant settlement or structural failure, 
however, snow concealed the visual inspection of the foundation in many areas. 
Interior floor finishes include resilient tile, ceramic tile, carpet, concrete, and painted concrete 
slab.  Interior wall finishes include painted drywall and painted concrete masonry unit.  Interior 
ceiling finishes include suspended acoustic tiles and painted drywall.  
The building is generally compliant in terms of the required provision of an ADA compliant common 
area restroom. 
 
Electrical Systems 
Granby Middle School is served by a utility owned outdoor pad mounted transformer located on 
the back side of the building. A service feeder from this transformer terminates in a 1600-amp 
switchgear with main fusible bolt lock switch and distribution sections containing fused disconnects 
for feeders to panels and equipment. Electric service is rated for 1600- amp, 480 y /277 v, 3ph 4 
wire. Feeders to power panels in the building originate from this switchboard. Branch circuits from 
these panels provide power to lighting, outlets, HVAC equipment and kitchen appliances in the 
school.  Lighting is a mix of fluorescent and recessed fixtures with LED lamps. Classroom lights 
are suspended with fluorescent lamps controlled by a motion sensor and wall switch. An outdoor 
diesel fired 500 kw generator set powers the entire school as it is an emergency shelter. 
 
Fire Alarm / Protection Systems 
The fire alarm system is comprised of a main control panel (MFG -FireLite MS-9600UDLS), power 
boosters, devices and wiring. An Ansul system provides fire protection for the kitchen hood.  
 
Mechanical / Plumbing Systems 
Granby Middle School is heated with three hot water (HW) boilers.  HW is circulated to eight roof 
top units (RTUs) on the roof and five air handling units (AHUs) in the mechanical penthouse. HW is 
also circulated to cabinet unit heaters (CUHs), unit heaters (UHs), fin tube radiation (FTR) as well 
as HW reheat coils in variable air volume (VAV) terminal units throughout the building. Three of the 
above mentioned RTUs have direct expansion (DX) cooling coils with associated condensing units 
Report Date: 5/20/2026 
2026 Granby MS Facility Condition Assessment (FCA) 
SUMMARY OF FINDINGS 
Granby Memorial Middle School 

Page 7

to provide for cooling of the Choral, Instrument, and Cafeteria areas. The rest of the RTUs are heat 
only.  Also, one of the above mentioned air handling units has DX cooling with an associated 
condensing unit as well to provide cooling of the administration area. The rest of the AHUs in the 
building are heat only.  Additionally, there are two heat pump split systems that heat and cool the 
Audio Visual room and the Technology Lab spaces.  All equipment appears to be operable. Roof 
mounted exhaust fans provide exhaust for bathrooms and other exhaust needs.  
The plumbing system provides domestic hot water to the building from three electric domestic hot 
water heaters (DHWHs) in the boiler room as well as two instantaneous gas-fired DHWHs in the 
rear domestic water service entrance room. The instantaneous DHWHs provide domestic hot 
water for the kitchen. Lavatories, water closets, urinals, and kitchen sink fixtures appear to be in 
good condition. Plumbing supply and sanitary piping were advised to be in a functional overall 
state. 
Report Date: 5/20/2026 
2026 Granby MS Facility Condition Assessment (FCA) 
SUMMARY OF FINDINGS 
Granby Memorial Middle School 

Page 8

2026 Granby MS Facility Condition Assessment 
ASSET TYPES PRESENT & CONDITION - GRANBY MIDDLE SCHOOL
Subsystem Name Component Name EUL COND NOTES
BUILDING ENVELOPE - ASSETS / COMPONENTS
B20  Exterior Enclosure
B2010  Exterior Wall SELECT TYPE(S)
B2010-01  Cast in Place Concrete Wall 75
B2010-02  Precast Concrete Wall 45
B2010-03  Brick Masonry Wall 75 E
All elevations. No evidence 
of failed grout or control 
joints 
B2010-03  Brick Masonry Wall 75
B2010-04  Concrete Block Wall (Common) 60
B2010-05  Concrete Block Wall (Decorative) 60
B2010-06  Cut Stone Wall 75
B2010-07  Cast Stone Wall 60
B2010-11  EIFS Wall 20
B2010-12  Stucco Wall 50
B2010-13  Translucent Panel Wall 15
B2010-14  Aggregate Faced Composite Panel Wall 45
B2010-15  Concrete Faced Insulated Panel Wall 45
B2010-16  Wood Shake Siding Wall 45
B2010-17  Wood Siding Wall 25
B2010-18  Fiber Cement Siding Exterior Wall 45
B2010-19  Preformed Metal Siding Wall 35
B2010-20  Vinyl Siding Wall 25
B2010-21  Clay Tile Shingle Wall 45
B2010-22  Slate Shingle Wall 75
B2010-23  High Pressure Laminate Panel 50
B2010-24  Pressure Treated Wood Panel 35
B2010-25  Decorative Wood Panel 20
B2010-26  Aluminum Siding Wall 35
B2010-27  Porcelain Tile Wall 60
B2010-28  Copper Panel Wall 50
B2010-29  Metal Panel Wall 15
B2010-30  Quarry Tile Wall 35
B2010-31  Composite Wall Panel 50
B2010-32  Plywood Sheathing 30
B2010-33  Plywood Sheathing Salt Structure 15
B2010-34  Fabric Cover & Metal Frame Wall/Roof Assm 20
B2010-35  Insulated Metal Panel Wall 15
B2010-37  Board & Batten Siding 20
B2010-38  Galvanized Steel Lattice Structure 60
3/31/2026
StudioJAED UNIFORMAT Master Asset List - Copyright 2026
Legend:  E = Excellent, G = Good, F = Fair, P = Poor, FD = Failed / Failing, NA = No Access Page 1 of 5

Page 9

2026 Granby MS Facility Condition Assessment 
ASSET TYPES PRESENT & CONDITION - GRANBY MIDDLE SCHOOL
Subsystem Name Component Name EUL COND NOTES
B2020  Exterior Window SELECT TYPE(S)
B2020-01  Steel Frame Window 45 P
Significant draft felt at 
majority of windows on all 
floors and elevations.  Staff 
complains of drafty 
conditions.
B2020-02  Aluminum Frame Window 50
B2020-03  Wood Frame Window 40
B2020-04  Vinyl Frame Window 30
B2020-05  Aluminum Storefront System 50
B2020-06  Metal Framed Curtain Wall 50
B2020-07  Detention Window 45
B2020-08  Storm Window 15
B2020-09  Composite Window 40
B2020-10  Wood Storefront System 40
B2020-11  Glass Block Window 40
B2020-12  Clad Frame Window 40
B2030  Exterior Door SELECT TYPE(S)
B2030-01  Aluminum Frame Storefront Door 50
B2030-02  Frameless Glass Storefront Door 50
B2030-03  Automatic Sliding Storefront Door 50
B2030-04  Hollow Metal Door 20
B2030-05  Wood Door 40
B2030-06  Plastic Laminate Door 30
B2030-07  Fiberglass Door 45
B2030-08  Overhead Door 25
B2030-09  Storm Door 15
B2030-10  Steel Detention Door 45
B2030-11  Hinged Emergency Egress Grate 40
B2030-12  Composite Door 40
B2030-13  Residential Sliding Glass Door 15
B2030-14  Fabric / Mesh Door 10
B2030-15  Oversized Metal Hangar Door 30
B2030-16  Sliding Barn Door 50
B2030-17  Basement Access Door 30
B2030-18  Single-Panel Lift Door 30
B2030-19  Steel Frame Storefront Door 30 P Signs of corrosion at base of frame
B2030-20  FRP Door 30
B2030-21  Drop-In Kennel Door Closing Panel 20
B2030-22  Steel Door 45
3/31/2026
StudioJAED UNIFORMAT Master Asset List - Copyright 2026
Legend:  E = Excellent, G = Good, F = Fair, P = Poor, FD = Failed / Failing, NA = No Access Page 2 of 5

Page 10

2026 Granby MS Facility Condition Assessment 
ASSET TYPES PRESENT & CONDITION - GRANBY MIDDLE SCHOOL
Subsystem Name Component Name EUL COND NOTES
B30  Roofing
B3010  Roof Covering SELECT TYPE(S)
B3010-01  Asphalt / Fiberglass Shingles 20
B3010-02  Slate Shingles 70
B3010-03  Wood Shingles & Shakes 30
B3010-04  Clay Roof Tiles 30
B3010-05  Metal Roof Tiles 40
B3010-06  Metal Roof Panels 40 E
Reviewed with drone and 
photos of areas visible from 
flat roof
B3010-07  Built Up Bituminous Roof 20
B3010-08  Modified Bituminous Roof 20
B3010-09  Elastomeric Roof 15
B3010-10  Coal Tar Roof 28
B3010-11  EPDM Roof 25 E Replaced in 2019
B3010-12  PVC Roof 25
B3010-13  Hypalon Roof 25
B3010-14  Natural Green Roof 25
B3010-15  Inverted Roof Membrane Assembly 40
B3010-16  PMMA Roof Membrane Assembly 20
B3010-17  Unknown Roof Type 0
B3010-18  Concrete Roof 50
B3010-19  Copper Roof 50
B3010-20  Tin Roof 50
B3010-21  Synthetic Slate Roof 90
B3010-22  Asphalt / Fiberglass Shingles Extended Life 30
B3010-23  Fabric Covered Roof 20
B3010-24  Waterproof Roof Membrane Assembly 20
B3020  Roof Opening SELECT TYPE(S)
B3020-03  Skylight 30
Special Component Prefabricated Galvanized Cupola 50 G Some peeling paint.  No leaks
VERTICAL TRANSPORTATION - ASSETS / COMPONENTS
D10  Conveying
D1010  Elevator & Lift D1010-01  Hydraulic Elevator 25 P
Installed in 1992. Nearing 
end of useful life. Located in 
A Wing near Nurse and 
Media Center
D1010-02  Electric Traction Elevator 25
D1010-03  Wheelchair Lift 20
3/31/2026
StudioJAED UNIFORMAT Master Asset List - Copyright 2026
Legend:  E = Excellent, G = Good, F = Fair, P = Poor, FD = Failed / Failing, NA = No Access Page 3 of 5

Page 11

2026 Granby MS Facility Condition Assessment 
ASSET TYPES PRESENT & CONDITION - GRANBY MIDDLE SCHOOL
Subsystem Name Component Name EUL COND NOTES
ELECTRICAL - ASSETS / COMPONENTS
D50  Electrical
D5010  Electrical Service & 
Distribution D5010-01  Primary Electrical Service 30 P Outdoor- Owned by Utility Co
D5010-02  Primary Transformer 30 P Outdoor- Owned by Utiliyt Co 
D5010-04  Secondary Transformer 30 P Located Building Wide
D5010-05  Main Distribution Panel 30 P Main Elect Rm,  1660 amp 480/277v 
D5010-06  Main Disconnect Switch 30 P Main Elect Rm , 1600 amp ,FSW 
D5010-07  Main Switch Gear 30
D5010-08  Motor Control Center 30
D5010-16  Bldg Wide Electrical Service & Distr 40 F
D5020  Lighting & Branch 
Wiring D5020-10  Building Wide General Lighting 20 F
D5021  Branch Wiring D5021-03  Building Wide Branch Wiring 40 F
D5090  Other Electrical 
Systems D5090-01  Emergency Generator 25 G
FIRE LIFE SAFETY SYSTEM - ASSETS / COMPONENTS
D40  Fire Protection
D4010  Sprinklers D4010-01  Wet Pipe Sprinkler System 30
D4010-02  Dry Pipe Sprinkler System 30
D4010-03  Fire Pump 15
D4090  Other Fire 
Protection Systems D4090-01  Kitchen Exhaust Fire Suppression System 15 G Quantity (3)
D4090-02  Clean Agent Fire Suppression System 15
D4090-03  Halon Fire Suppression System 15
D50  Electrical
D5030  Fire Alarm System D5030-03  Building Wide Fire Alarm System 20 G
D5030-04  Head End Central Monitoring Station Sytem 20
D5030-05  Residential Smoke & Heat Detectors 5
MECHANICAL / PLUMBING - ASSETS / COMPONENTS
D20  Plumbing
D2010  Plumbing Fixtures D2010-01  Building Wide Plumbing Fixtures & Trim 20 G
D2020  Domestic Water 
Distribution D2020-01  Domestic Water Piping & Valves & Insulation 30 G
D2020-08  Domestic Water Heater 15 E
Total of (5). (3) are tank 
type electric & (2) are gas 
fired instantaneous
D2020-10  Domestic Hot Water Generator 15
D2030  Sanitary Waste D2030-01  Sanitary Pipe & Fittings 40 G
3/31/2026
StudioJAED UNIFORMAT Master Asset List - Copyright 2026
Legend:  E = Excellent, G = Good, F = Fair, P = Poor, FD = Failed / Failing, NA = No Access Page 4 of 5

Page 12

2026 Granby MS Facility Condition Assessment 
ASSET TYPES PRESENT & CONDITION - GRANBY MIDDLE SCHOOL
Subsystem Name Component Name EUL COND NOTES
D30  HVAC
D3020  Heat Generation D3020-01  Steam Boiler 30
D3020-02  Hot Water Boiler 30 E Quantity (3). B-1, B-2, & B-3
D3020-02  Hot Water Boiler 30
D3020-14  Gas Fired Hot Air Furnace 15
D3020-15  Oil Fired Hot Air Furnace 15
D3030  Refrigeration D3030-01  Chiller 30
D3030-02  Cooling Tower 15
D3040  HVAC Distribution D3040-02  Air Handling Unit 20 F Heat only RTUs. RTU-1, 2, 3, 4, & 8
D3040-02  Air Handling Unit 20 F Quantity (5). AH-1 thru AH-5
D3040-18  Hydronic Distribution Pumps 15 E Quantity (4). P-1, P-2, P-3, & P-4
D3040-20  Heat Exchanger 30
D3040-28  Variable Refrigerant Flow System (VRF) 20
D3040-31  Dedicated Outdoor Air System (DOAS) 15
D3050  Terminal & 
Packaged Units D3050-01  Packaged Rooftop Air Cond & Heating Unit 15 F
Quantity (3). RTU-5, 6, & 7.  
All have remote condensing 
units
D3050-02  Packaged Rooftop Air Conditioning Unit 15
D3050-03  Packaged Air Conditioning & Heating Unit 15
D3050-04  Packaged Air Conditioning Unit 15
D3050-06  Computer Room Air Conditioning System 15
D3050-07  Computer Room Split System 20
D3050-08  Split System Air Conditioning 10
D3050-10  Heating Only Unit Ventilator 20
D3050-11  Cooling Only Unit Ventilator 20
D3050-12  Heating & Cooling Unit Ventilator 20
D3050-16  Heating Only Fan Coil Unit 20
D3050-17  Cooling Only Fan Coil Unit 20
D3050-18  Heating & Cooling Fan Coil Unit 20
D3050-21  Air to Air Split System Heat Pump 20 F Quantity (2). Ductless
D3050-23  Water Source Heat Pump 20
D3060  HVAC Instrum & 
Controls D3060-01  Pneumatic Control System 15
D3060-02  Electronic Control System 15 F
D3060-03  Local Control System 10 F
D3090  Other Special 
HVAC Sys/Equip D3090-02  Laboratory Fume Hood 15 G
3/31/2026
StudioJAED UNIFORMAT Master Asset List - Copyright 2026
Legend:  E = Excellent, G = Good, F = Fair, P = Poor, FD = Failed / Failing, NA = No Access Page 5 of 5

Page 13

2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 1 of 19
System Name /                
Corrective Action
Correction Notes Primary 
Justification
 Priority 
(Years)
Quantity / 
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated 
Total Cost 
Jun 19, 2026Date Printed:
Area    
Name
Granby Middle School
B20  Exterior Enclosure
B2010-03-07C  Correct Brick 
Masonry Wall Stained Finish 
by Cleaning
50Damaged / 
Inoperable
     P1    
Within 1 Yr
East Elevation B Wing
SQFT
$615Building 
Exterior
B2010-03-07C  Correct Brick 
Masonry Wall Stained Finish 
by Cleaning
40Damaged / 
Inoperable
     P1    
Within 1 Yr
East Elevation B Wing 
(outside Rm 66) SQFT
$492Building 
Exterior
B2010-03-07C  Correct Brick 
Masonry Wall Stained Finish 
by Cleaning
50Damaged / 
Inoperable
     P1    
Within 1 Yr
North Elevation B Wing
SQFT
$615Building 
Exterior
B2010-03-07C  Correct Brick 
Masonry Wall Stained Finish 
by Cleaning
2,000Damaged / 
Inoperable
     P1    
Within 1 Yr
Northeast interior corner 
elevation B wing SQFT
$24,595Building 
Exterior
B2010-03-07C  Correct Brick 
Masonry Wall Stained Finish 
by Cleaning
900Damaged / 
Inoperable
     P1    
Within 1 Yr
East Elevation A Wing.
SQFT
$11,068Building 
Exterior
B2020-02-01C  Correct 
Aluminum Frame Window 
Deterioration by Demolition & 
Replacement
3,500Useful Life      P2    
Within 3 Yrs
All exterior windows in the 
entire building. (Poor 
thermal performance, 
drafts, and finish has 
deteriorated).
SQFT
$929,318Building 
Exterior
B2020-05-01C  Correct 
Aluminum Storefront System 
Deterioration by Demolition & 
Replacement
440Useful Life      P4  
Within 10 
A & C wings - south 
elevation vestibule. SQFT
$248,121Building 
Exterior
B2020-05-03C  Correct 
Aluminum Storefront System 
Finish Deterioration by Prep & 
Refinish
440Damaged / 
Inoperable
     P1    
Within 1 Yr
A & C wings - south 
elevation vestibules. SQFT
$19,178Building 
Exterior
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.  
 CT2000©

Page 14

2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 2 of 19
System Name /                
Corrective Action
Correction Notes Primary 
Justification
 Priority 
(Years)
Quantity / 
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated 
Total Cost 
Jun 19, 2026Date Printed:
Area    
Name
B2020-05-03C  Correct 
Aluminum Storefront System 
Finish Deterioration by Prep & 
Refinish
440Damaged / 
Inoperable
      P2    
Within 3 Yrs
Prime and Paint. A & C 
wings - South Elevation 
vestibules. SQFT
$19,178Building 
Wide
B2021-01-07C  Correct 
Window General Moisture or 
Air Infiltration by Recaulking
60Damaged / 
Inoperable
     P1    
Within 1 Yr
A & C Wings - south 
elevation vestibules. LNFT
$1,248Building 
Exterior
B2021-01-10C  Correct 
Window General Lintel Finish 
Deterioration by Prep & 
Refinish
620Damaged / 
Inoperable
      P2    
Within 3 Yrs
All exterior doors and 
windows. LNFT
$6,169Building 
Exterior
B2021-01-10C  Correct 
Window General Lintel Finish 
Deterioration by Prep & 
Refinish
170Damaged / 
Inoperable
      P2    
Within 3 Yrs
At brick on the North and 
East exterior elevations of 
the Auxiliary Gym and the 
West exterior elevations.
LNFT
$1,692Building 
Exterior
B2030-04-02C  Correct Hollow 
Metal Door & Frame 
Deterioration by Demolition & 
Replacement
1Useful Life     P1    
Within 1 Yr
Gym Vestibule North 
Elevation - (significant 
corrosion at base of 
frame).
EACH
$9,896Building 
Exterior
B2030-04-03C  Correct Hollow 
Metal Door & Frame Finish 
Deterioration by Prep & 
Refinish
12Damaged / 
Inoperable
      P2    
Within 3 Yrs
All exterior doors
EACH
$6,857Building 
Exterior
B2030-08-02C  Correct 
Overhead Door & Frame 
Deterioration by Demolition & 
Replacement
160Useful Life      P2    
Within 3 Yrs
(1) Maintenance and (1) 
Industrial Technology SQFT
$34,854Building 
Exterior
Subtotal Estimated Cost: B20  Exterior Enclosure $1,313,895
B30  Roofing
B3060-03-03C  Correct 
Historic Cupola Deterioration 
by Restoration & Refinish
75Damaged / 
Inoperable
     P1    
Within 1 Yr SQFT
$5,097Roof
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.  
 CT2000©

Page 15

2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 3 of 19
System Name /                
Corrective Action
Correction Notes Primary 
Justification
 Priority 
(Years)
Quantity / 
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated 
Total Cost 
Jun 19, 2026Date Printed:
Area    
Name
Subtotal Estimated Cost: B30  Roofing $5,097
C10  Interior Construction
C1011-01-03C  Correct 
Accordion Folding Partition Not 
Required by Infill
800Damaged / 
Inoperable
      P3    
Within 5 Yrs
Inoperable and not 
desired by staff. Remove 
and replace with Acoustic 
Metal stud and gypsum 
board wall. Classrooms 
62, 63, 72, 73, 82, and 83.
SQFT
$60,236Classroom
C1011-01-04C  Correct 
Accordion Folding Partition 
Deterioration by Demolition & 
Replacement with Operable 
Partition
1,800Useful Life      P2    
Within 3 Yrs
Replace w/ roll down 
divider curtain. SQFT
$300,436Gymnasium
C1020-01-01C  Correct Hollow 
Metal Door Deterioration by 
Demolition & Replacement
1Useful Life      P2    
Within 3 Yrs
A Wing - Choral room to 
corridor EACH
$4,523Building 
Wide
C1020-01-03C  Correct Hollow 
Metal Door Finish 
Deterioration by Prep & 
Refinish
4Damaged / 
Inoperable
      P2    
Within 3 Yrs
B Wing - 6th grade stair 
and Northwest Stair - First 
and Second Floors. EACH
$2,849Building 
Wide
C1020-01-03C  Correct Hollow 
Metal Door Finish 
Deterioration by Prep & 
Refinish
145Damaged / 
Inoperable
      P2    
Within 3 Yrs
FRAME ONLY - All 
interior door frames in 
entire building (does not 
include main office). Metal 
frames. (47) A wing first 
floor, (24) A wing second 
floor, (25) B wing first 
floor, (23) B wing second 
floor, (26) C Wing.
EACH
$103,258Building 
Wide
C1020-02-01C  Correct Wood 
Door Deterioration by 
Demolition & Replacement
19Useful Life      P4  
Within 10 
B Wing Second Floor - 
Wood veneer door w/ 
metal frame. EACH
$61,360Building 
Wide
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.  
 CT2000©

Page 16

2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 4 of 19
System Name /                
Corrective Action
Correction Notes Primary 
Justification
 Priority 
(Years)
Quantity / 
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated 
Total Cost 
Jun 19, 2026Date Printed:
Area    
Name
C1020-02-01C  Correct Wood 
Door Deterioration by 
Demolition & Replacement
23Useful Life      P4  
Within 10 
C Wing
EACH
$74,277Building 
Wide
C1020-02-01C  Correct Wood 
Door Deterioration by 
Demolition & Replacement
18Useful Life      P4  
Within 10 
A Wing Second Floor - 
Wood veneer door w/ 
metal frame. EACH
$58,130Building 
Wide
C1020-02-01C  Correct Wood 
Door Deterioration by 
Demolition & Replacement
18Useful Life      P4  
Within 10 
B Wing Second Floor - 
Wood veneer door w/ 
metal frame. EACH
$58,130Building 
Wide
C1020-02-01C  Correct Wood 
Door Deterioration by 
Demolition & Replacement
18Useful Life      P2    
Within 3 Yrs
All toilet rooms and Nurse 
Supervisor Office - 
Veneer has been worn or 
damaaged. Wood veneer 
door w/ metal frame. (10) 
A wing first floor and (8) 
second floor.
EACH
$58,130Building 
Wide
C1020-02-01C  Correct Wood 
Door Deterioration by 
Demolition & Replacement
24Useful Life      P4  
Within 10 
A Wing First Floor. Wood 
veneer door w/ metal 
frame. EACH
$77,507Building 
Wide
C1030-02-01C  Correct Toilet 
Compartment Deterioration by 
Demolition & Replacement
31Useful Life      P4  
Within 10 
All multiple fixture toilet 
rooms. EACH
$76,231Restroom
C1030-07-03C  Correct 
Athletic Locker Deterioration 
by Demolition & Replacement
333Useful Life      P4  
Within 10 
Girls Locker Room.
EACH
$436,113Locker 
Room
C1030-07-03C  Correct 
Athletic Locker Deterioration 
by Demolition & Replacement
336Useful Life      P4  
Within 10 
Boys Locker Room.
EACH
$440,042Locker 
Room
Subtotal Estimated Cost: C10  Interior Construction $1,811,222
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.  
 CT2000©

Page 17

2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 5 of 19
System Name /                
Corrective Action
Correction Notes Primary 
Justification
 Priority 
(Years)
Quantity / 
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated 
Total Cost 
Jun 19, 2026Date Printed:
Area    
Name
C20  Stairs & Ramps
C2050-01-03C  Correct 
Handrail Finish Deterioration 
by Prep & Refinish
260Damaged / 
Inoperable
      P2    
Within 3 Yrs
(50 lf) A Wing Open Stair, 
(50 lf) A Wing Media 
Center, (80 lf) B wing - 
Northwest Stair, and (80 
lf) 6th grade Stair
LNFT
$8,986Stair Tower
Subtotal Estimated Cost: C20  Stairs & Ramps $8,986
C30  Interior Finishes
C3020-02-01C  Correct 
Resilient Tile Floor Finish 
Deterioration by Demolition & 
Replacement
2,400Useful Life      P2    
Within 3 Yrs
A wing
SQFT
$37,630Cafeteria
C3020-02-01C  Correct 
Resilient Tile Floor Finish 
Deterioration by Demolition & 
Replacement
23,600Useful Life      P3    
Within 5 Yrs
A Wing - First Floor 
Nurse, Rms S7 & S8. A 
Wing - Second Floor 
Room M1-M5. B Wing - 
First Floor Rms A1, A3, 
A4, 61-68.  B Wing - 
Second Floor Rms 71-77 
and 81-87.
SQFT
$370,029Classroom
C3020-02-01C  Correct 
Resilient Tile Floor Finish 
Deterioration by Demolition & 
Replacement
125Useful Life      P2    
Within 3 Yrs
B Wing - 2nd floor, 6th 
grade stair. SQFT
$1,960Stair Tower
C3020-02-01C  Correct 
Resilient Tile Floor Finish 
Deterioration by Demolition & 
Replacement
125Useful Life      P2    
Within 3 Yrs
B wing northwest stair - 
2nd floor. SQFT
$1,960Stair Tower
C3020-11-02C  Correct Hard 
Wood Floor Finish 
Deterioration Prep & Refinish
1,500Damaged / 
Inoperable
      P3    
Within 5 Yrs
Auxiliary Gym.
SQFT
$17,750Gymnasium
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.  
 CT2000©

Page 18

2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 6 of 19
System Name /                
Corrective Action
Correction Notes Primary 
Justification
 Priority 
(Years)
Quantity / 
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated 
Total Cost 
Jun 19, 2026Date Printed:
Area    
Name
C3020-11-02C  Correct Hard 
Wood Floor Finish 
Deterioration Prep & Refinish
6,300Damaged / 
Inoperable
      P4  
Within 10 
Main Gym.
SQFT
$74,548Gymnasium
C3020-12-01C  Correct Carpet 
Floor Finish Deterioration by 
Demolition & Replacement
19Useful Life      P2    
Within 3 Yrs
6th grade stair walk off 
carpet - First Floor. SQYD
$3,399Building 
Wide
C3020-12-01C  Correct Carpet 
Floor Finish Deterioration by 
Demolition & Replacement
27Useful Life      P2    
Within 3 Yrs
First floor - (75 sqft) 
Office S4, (75 sqft) Office 
S3, (75 sqft) Office S5. SQYD
$4,830Building 
Wide
C3020-12-01C  Correct Carpet 
Floor Finish Deterioration by 
Demolition & Replacement
29Useful Life      P2    
Within 3 Yrs
First Floor - Arts Faculty
SQYD
$5,188Building 
Wide
C3020-12-01C  Correct Carpet 
Floor Finish Deterioration by 
Demolition & Replacement
29Useful Life      P3    
Within 5 Yrs
Second Floor - 8th gtrade 
counselor office SQYD
$5,188Building 
Wide
Subtotal Estimated Cost: C30  Interior Finishes $522,480
D10  Conveying
D1010-01-03C  Correct 
Hydraulic Passenger Elevator 
(2500 Capacity) Deterioration 
by Demolition & Replacement
2Useful Life      P2    
Within 3 Yrs FLR
$175,149Building 
Wide
Subtotal Estimated Cost: D10  Conveying $175,149
D20  Plumbing
D2010-01-01C  Correct 
Building Wide Plumbing 
Fixtures & Trim Deterioration 
by Demolition & Replacement 
(Bldg SF)
73,406Useful Life      P4  
Within 10 BLDG SF
$382,537Building 
Wide
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.  
 CT2000©

Page 19

2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 7 of 19
System Name /                
Corrective Action
Correction Notes Primary 
Justification
 Priority 
(Years)
Quantity / 
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated 
Total Cost 
Jun 19, 2026Date Printed:
Area    
Name
D2020-01-01C  Correct 
Domestic Water Piping & 
Valves & Insulation 
Deterioration by Demolition & 
Replacement (Bldg SF)
73,406Useful Life      P4  
Within 10 BLDG SF
$1,878,279Building 
Wide
D2020-06-01C  Correct 
Plumbing Pump Deterioration 
by Demolition & Replacement
1Useful Life      P4  
Within 10 
Taco
EACH
$9,598Boiler Room
D2020-08-14C  Correct 
Domestic Water Heater (120 
Gal Electric) Deterioration by 
Demolition & Replacement
3Useful Life      P4  
Within 10 
AO Smith M/N DRE-120 
100 DOM 2018 EACH
$90,584Boiler Room
Subtotal Estimated Cost: D20  Plumbing $2,360,997
D30  HVAC
D3010-05-02C  Correct 
Natural Gas Distribution Piping 
Pipe Surface Deterioration by 
Prep & Refinish
150Useful Life      P3    
Within 5 Yrs LNFT
$5,851Roof
D3030-04-04C  Correct 
Condensing Unit (20 Tons) 
Deterioration by Demolition & 
Replacement
1Useful Life     P1    
Within 1 Yr
CU-3 13 Tons connected 
to RTU-6 McQuay M/N 
ALP019DS27-ER10 S/N 
STNU990200141 size 
taken from original dwgs
EACH
$73,598Roof
D3030-04-04C  Correct 
Condensing Unit (20 Tons) 
Deterioration by Demolition & 
Replacement
1Useful Life     P1    
Within 1 Yr
CU-2 18 Tons connected 
to RTU-5 McQuay M/N 
unknown S/N unknown 
size taken from original 
dwgs
EACH
$73,598Roof
D3030-04-05C  Correct 
Condensing Unit (30 Tons) 
Deterioration by Demolition & 
Replacement
1Useful Life     P1    
Within 1 Yr
CU-4 25 Tons connected 
to RTU-7 McQuay M/N 
ALP027C-X S/N 
5XB0500300 size taken 
from original dwgs
EACH
$100,311Roof
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.  
 CT2000©

Page 20

2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 8 of 19
System Name /                
Corrective Action
Correction Notes Primary 
Justification
 Priority 
(Years)
Quantity / 
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated 
Total Cost 
Jun 19, 2026Date Printed:
Area    
Name
D3030-04-10C  Correct 
Condensing Unit (80 Tons) 
Deterioration by Demolition & 
Replacement
1Useful Life     P1    
Within 1 Yr
CU-1 71 Tons connected 
to AH-1 McQuay M/N 
ALP080C S/N 
5XA0181800 size taken 
from original dwgs
EACH
$196,632Roof
D3040-01-01C  Correct Supply 
Fan (.5 HP) Deterioration by 
Demolition & Replacement
1Useful Life      P4  
Within 10 
Cook Supply for KEF-1 
labeled KEF-1 EACH
$10,820Roof
D3040-01-03C  Correct Supply 
Fan (2 HP) Deterioration by 
Demolition & Replacement
1Useful Life      P2    
Within 3 Yrs
SF-2  1.5 HP size taken 
from original dwgs EACH
$15,743Roof
D3040-02-15C  Correct Air 
Handling Unit (75 Tons) 
Deterioration by Demolition & 
Replacement
1Useful Life      P2    
Within 3 Yrs
AH-1 71 Tons McQuay 
M/N LSL141DH size 
taken from original dwgs 
connected to CU-1
EACH
$348,366Penthouse
D3040-02-20C  Correct Air 
Handling Unit Heating Only 
(2000 CFM) Deterioration by 
Demolition & Replacement
1Useful Life     P1    
Within 1 Yr
RTU-1 McQuay 2200 
CFM M/N RDS708BY S/N 
3XB0041503 EACH
$53,922Roof
D3040-02-22C  Correct Air 
Handling Unit Heating Only 
(4000 CFM) Deterioration by 
Demolition & Replacement
1Useful Life     P1    
Within 1 Yr
RTU-8 3500 CFM 
McQuay M/N RDS708BY 
S/N 3XB0042103 EACH
$69,850Roof
D3040-02-23C  Correct Air 
Handling Unit Heating Only 
(5000 CFM) Deterioration by 
Demolition & Replacement
1Useful Life     P1    
Within 1 Yr
RTU-4 McQuay M/N 
RDS708BY S/N 
3XB0041803 EACH
$82,413Roof
D3040-02-24C  Correct Air 
Handling Unit Heating Only 
(6000 CFM) Deterioration by 
Demolition & Replacement
1Useful Life      P2    
Within 3 Yrs
AH-3 5400 CFM McQuay 
M/N LHD111CH size 
taken from original dwgs EACH
$95,838Penthouse
D3040-02-24C  Correct Air 
Handling Unit Heating Only 
(6000 CFM) Deterioration by 
Demolition & Replacement
1Useful Life      P2    
Within 3 Yrs
AH-2 McQuay M/N 
LHD111CH size taken 
from original dwgs EACH
$95,838Penthouse
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.  
 CT2000©

Page 21

2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 9 of 19
System Name /                
Corrective Action
Correction Notes Primary 
Justification
 Priority 
(Years)
Quantity / 
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated 
Total Cost 
Jun 19, 2026Date Printed:
Area    
Name
D3040-02-25C  Correct Air 
Handling Unit Heating Only 
(7000 CFM) Deterioration by 
Demolition & Replacement
1Useful Life      P2    
Within 3 Yrs
AH-4 6150 CFM McQuay 
M/N LHD111CH size 
taken from original dwgs EACH
$134,900Penthouse
D3040-02-25C  Correct Air 
Handling Unit Heating Only 
(7000 CFM) Deterioration by 
Demolition & Replacement
1Useful Life      P2    
Within 3 Yrs
AH-5 6400 CFM McQuay 
M/N LHD111CH size 
taken from original dwgs EACH
$134,900Penthouse
D3040-02-25C  Correct Air 
Handling Unit Heating Only 
(7000 CFM) Deterioration by 
Demolition & Replacement
1Useful Life     P1    
Within 1 Yr
RTU-3 McQuay 6500 
CFM M/N RDS708BY S/N 
3XB0041703 EACH
$134,900Roof
D3040-02-25C  Correct Air 
Handling Unit Heating Only 
(7000 CFM) Deterioration by 
Demolition & Replacement
1Useful Life     P1    
Within 1 Yr
RTU-2 McQuay 6500 
CFM M/N RDS708BY S/N 
3XB0041603 EACH
$134,900Roof
D3040-04-01C  Correct VAV 
Terminal Unit Deterioration by 
Demolition & Replacement
8Useful Life      P2    
Within 3 Yrs EACH
$62,861Building 
Wide
D3040-04-03C  Correct VAV 
Terminal Unit with HW Reheat 
Deterioration by Demolition & 
Replacement
20Useful Life      P2    
Within 3 Yrs EACH
$208,056Building 
Wide
D3040-07-03C  Correct Return 
Air or Inline Fan (3 HP) 
Deterioration by Demolition & 
Replacement
4Useful Life      P2    
Within 3 Yrs
McQuay RAF-2, RAF-3, 
RAF-4, & RAF-5 EACH
$83,730Penthouse
D3040-07-07C  Correct Return 
Air or Inline Fan (15 HP) 
Deterioration by Demolition & 
Replacement
1Useful Life      P2    
Within 3 Yrs
RAF-1 McQuay
EACH
$44,351Penthouse
D3040-09-03C  Correct 
Exhaust or Induction Fan (1/5 
HP) Deterioration by 
Demolition & Replacement
5Useful Life      P2    
Within 3 Yrs
1/6 HP EF-2, 3, 9, 13, & 
15 size taken from 
original dwgs EACH
$43,732Roof
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.  
 CT2000©

Page 22

2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 10 of 19
System Name /                
Corrective Action
Correction Notes Primary 
Justification
 Priority 
(Years)
Quantity / 
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated 
Total Cost 
Jun 19, 2026Date Printed:
Area    
Name
D3040-09-05C  Correct 
Exhaust or Induction Fan (1/2 
HP) Deterioration by 
Demolition & Replacement
2Useful Life      P2    
Within 3 Yrs
EF-6 & 10 size taken from 
original dwgs EACH
$18,669Roof
D3040-09-05C  Correct 
Exhaust or Induction Fan (1/2 
HP) Deterioration by 
Demolition & Replacement
1Useful Life      P2    
Within 3 Yrs
1/3 HP EF-4 size taken 
from original dwgs EACH
$9,335Roof
D3040-09-05C  Correct 
Exhaust or Induction Fan (1/2 
HP) Deterioration by 
Demolition & Replacement
2Useful Life      P2    
Within 3 Yrs
1/4 HP EF-9 & 12 size 
taken from original dwgs EACH
$18,669Roof
D3040-09-07C  Correct 
Exhaust or Induction Fan (3/4 
HP) Deterioration by 
Demolition & Replacement
3Useful Life      P2    
Within 3 Yrs
EF-5, 8, & 11 size taken 
from original dwgs EACH
$33,219Roof
D3040-09-09C  Correct 
Exhaust or Induction Fan (1 
HP) Deterioration by 
Demolition & Replacement
1Useful Life      P2    
Within 3 Yrs
EF-1 size taken from 
original dwgs EACH
$9,293Roof
D3040-09-11C  Correct 
Exhaust or Induction Fan (3 
HP) Deterioration by 
Demolition & Replacement
1Useful Life      P4  
Within 10 
KEF-1  Cook
EACH
$12,765Roof
D3040-10-01C  Correct Roof 
Mounted Gravity Vent 
Deterioration by Demolition & 
Replacement
5Useful Life      P3    
Within 5 Yrs EACH
$38,430Roof
D3040-13-04C  Correct 
Ductwork & Insulation 
Deterioration by Duct Cleaning 
Building Wide (Bldg SF)
73,406Environ 
Imprv
      P2    
Within 3 Yrs BLDG SF
$273,125Building 
Wide
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.  
 CT2000©

Page 23

2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 11 of 19
System Name /                
Corrective Action
Correction Notes Primary 
Justification
 Priority 
(Years)
Quantity / 
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated 
Total Cost 
Jun 19, 2026Date Printed:
Area    
Name
D3040-13-08C  Correct 
Ductwork & Insulation 
(Exterior) Deterioration by 
Demolition & Replacement
100Useful Life     P1    
Within 1 Yr
Connected to RTU-7
SQFT
$10,637Roof
D3050-01-06C  Correct 
Packaged Rooftop Air 
Conditioning & Heating Unit 
(15 Ton) Deterioration by 
Demolition & Replacement
1Useful Life     P1    
Within 1 Yr
RTU-6 13 Tons McQuay 
M/N RDS708BY S/N 
3XB0042003 uses CU-3 EACH
$89,563Roof
D3050-01-07C  Correct 
Packaged Rooftop Air 
Conditioning & Heating Unit 
(20 Ton) Deterioration by 
Demolition & Replacement
1Useful Life      P2    
Within 3 Yrs
RTU-5 McQuay 18 Tons 
M/N RDS708BY S/N 
3XB0041903 uses CU-2 EACH
$130,039Roof
D3050-01-08C  Correct 
Packaged Rooftop Air 
Conditioning & Heating Unit 
(30 Ton) Deterioration by 
Demolition & Replacement
1Useful Life      P3    
Within 5 Yrs
RTU-7 McQuay 25 Tons 
M/N RDS802BY S/N 
3XB0043106 uses CU-4 EACH
$233,667Roof
D3050-19-01C  Correct 
Cabinet Heater Deterioration 
by Demolition & Replacement
10Useful Life     P1    
Within 1 Yr
Quantity taken from 
original dwgs EACH
$135,552Building 
Wide
D3050-20-04C  Correct Steam 
& Hot Water Unit Heater (200 
MBH) Deterioration by 
Demolition & Replacement
6Useful Life      P2    
Within 3 Yrs EACH
$53,560Gymnasium
s
D3050-21-11C  Correct 
Ductless Air to Air Split System 
Heat Pump (1.5 Ton) 
Deterioration by Demolition & 
Replacement
1Useful Life      P2    
Within 3 Yrs
Mitsubishi M/N PKA-
A18GAL S/N 72A00675B EACH
$7,895Audio Visual
D3050-21-12C  Correct 
Ductless Air to Air Split System 
Heat Pump (3 Ton) 
Deterioration by Demolition & 
Replacement
1Useful Life      P2    
Within 3 Yrs
Mitsubishi M/N 
PUG36BKB S/N 01184442 EACH
$17,986Technology 
Lab
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.  
 CT2000©

Page 24

2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 12 of 19
System Name /                
Corrective Action
Correction Notes Primary 
Justification
 Priority 
(Years)
Quantity / 
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated 
Total Cost 
Jun 19, 2026Date Printed:
Area    
Name
D3050-26-01C  Correct Steam 
or Hot Water Fin-Tube 
Radiation Deterioration by 
Demolition & Replacement
922Useful Life      P2    
Within 3 Yrs LNFT
$410,567Building 
Wide
D3060-02-03C  Correct 
Electronic Control (DDC) 
System Deterioration by 
Demolition & Replacement 
(Bldg SF)
55,055Useful Life     P1    
Within 1 Yr
Honeywell Niagra system
BLDG SF
$1,155,900Building 
Wide
D3060-03-02C  Correct Local 
Control System Deterioration 
by Demolition & Replacement 
with DDC System
18,352Useful Life     P1    
Within 1 Yr BLDG SF
$360,172Building 
Wide
D3090-01-01C  Correct Dust 
Collection System 
Deterioration by Demolition & 
Replacement
1Useful Life      P3    
Within 5 Yrs
Donldson
EACH
$5,487Exterior
D3090-06-01C  Correct 
Industrial Air Cleaner 
Deterioration by Demolition & 
Replacement
2Useful Life      P2    
Within 3 Yrs
Airomax
EACH
$12,611A2 
Technology
Subtotal Estimated Cost: D30  HVAC $5,242,249
D40  Fire Protection
D4010-01-02C  Correct Wet 
Pipe Sprinkler System 
Required by Install New (Bldg 
SF)
67,306Best 
Practice / 
Standard
      P2    
Within 3 Yrs
Item 1 of 4 required to 
provide sprinkler system 
in non-sprinklered areas 
of building.
BLDG SF
$906,763Building 
Wide
D4010-03-09C  Correct Diesel 
Drive Fire Pump, 60 HP, 
Required by Install New
1Best 
Practice / 
Standard
      P2    
Within 3 Yrs
Item 3 of 4 required to 
provide sprinkler system. 
Size is estimated. EACH
$252,530Building 
Property
Subtotal Estimated Cost: D40  Fire Protection $1,159,294
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.  
 CT2000©

Page 25

2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 13 of 19
System Name /                
Corrective Action
Correction Notes Primary 
Justification
 Priority 
(Years)
Quantity / 
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated 
Total Cost 
Jun 19, 2026Date Printed:
Area    
Name
D50  Electrical
D5010-04-07C  Correct 
Secondary Transformer (45 
kVA) Deterioration by 
Demolition & Replacement
1Useful Life     P1    
Within 1 Yr
Elect Closet Wing A
EACH
$19,1241st Floor
D5010-04-07C  Correct 
Secondary Transformer (45 
kVA) Deterioration by 
Demolition & Replacement
1Useful Life     P1    
Within 1 Yr EACH
$19,124Electrical 
Room
D5010-04-09C  Correct 
Secondary Transformer (112.5 
kVA) Deterioration by 
Demolition & Replacement
1Useful Life      P2    
Within 3 Yrs EACH
$41,068Penthouse
D5010-04-10C  Correct 
Secondary Transformer (150 
kVA) Deterioration by 
Demolition & Replacement
1Useful Life     P1    
Within 1 Yr EACH
$43,190Electrical 
Room
D5010-05-05C  Correct Main 
Distribution Panel (1600 AMP) 
Deterioration by Demolition & 
Replacement
1Useful Life     P1    
Within 1 Yr EACH
$119,464Electrical 
Room
D5010-06-05C  Correct Main 
Disconnect Switch (1600 
AMP) Deterioration by 
Demolition & Replacement
1Useful Life     P1    
Within 1 Yr EACH
$77,837Electrical 
Room
D5010-08-21C  Correct Motor 
Control Center Variable 
Frequency Drive (20 HP) 
Deterioration by Demolition & 
Replacement
2Useful Life      P2    
Within 3 Yrs EACH
$38,748Penthouse
D5010-09-12C  Correct 
Automatic Transfer Switch 
(1600 AMP) Deterioration by 
Demolition & Replacement
1Useful Life      P4  
Within 10 EACH
$86,743Electrical 
Room
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.  
 CT2000©

Page 26

2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 14 of 19
System Name /                
Corrective Action
Correction Notes Primary 
Justification
 Priority 
(Years)
Quantity / 
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated 
Total Cost 
Jun 19, 2026Date Printed:
Area    
Name
D5010-10-04C  Correct 
Distribution Wiring 
Deterioration by Demolition & 
Replacement (Bldg SF)
73,406Useful Life      P3    
Within 5 Yrs BLDG SF
$1,801,449Building 
Wide
D5010-12-05C  Correct 
Panelboard (225 AMP) 
Deterioration by Demolition & 
Replacement
4Useful Life     P1    
Within 1 Yr
Wing B
EACH
$74,1181st Floor
D5010-12-05C  Correct 
Panelboard (225 AMP) 
Deterioration by Demolition & 
Replacement
2Useful Life     P1    
Within 1 Yr
Elect Closet Wing A
EACH
$37,0591st Floor
D5010-12-05C  Correct 
Panelboard (225 AMP) 
Deterioration by Demolition & 
Replacement
2Useful Life     P1    
Within 1 Yr
Wing B
EACH
$37,0592nd Floor
D5010-12-05C  Correct 
Panelboard (225 AMP) 
Deterioration by Demolition & 
Replacement
2Useful Life     P1    
Within 1 Yr
Wing A
EACH
$37,0592nd Floor
D5010-12-05C  Correct 
Panelboard (225 AMP) 
Deterioration by Demolition & 
Replacement
4Useful Life     P1    
Within 1 Yr EACH
$74,118Electrical 
Room
D5010-12-05C  Correct 
Panelboard (225 AMP) 
Deterioration by Demolition & 
Replacement
2Useful Life     P1    
Within 1 Yr EACH
$37,059Kitchen
D5010-12-05C  Correct 
Panelboard (225 AMP) 
Deterioration by Demolition & 
Replacement
3Useful Life      P2    
Within 3 Yrs EACH
$55,589Penthouse
D5010-14-01C  Correct Motor 
Starter Deterioration by 
Demolition & Replacement
2Useful Life     P1    
Within 1 Yr
Elect Closet Wing A
EACH
$31,8231st Floor
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.  
 CT2000©

Page 27

2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 15 of 19
System Name /                
Corrective Action
Correction Notes Primary 
Justification
 Priority 
(Years)
Quantity / 
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated 
Total Cost 
Jun 19, 2026Date Printed:
Area    
Name
D5010-14-01C  Correct Motor 
Starter Deterioration by 
Demolition & Replacement
3Useful Life     P1    
Within 1 Yr EACH
$47,734Electrical 
Room
D5010-14-01C  Correct Motor 
Starter Deterioration by 
Demolition & Replacement
2Useful Life     P1    
Within 1 Yr EACH
$31,823Kitchen
D5010-14-01C  Correct Motor 
Starter Deterioration by 
Demolition & Replacement
8Useful Life      P2    
Within 3 Yrs EACH
$127,291Penthouse
D5010-14-01C  Correct Motor 
Starter Deterioration by 
Demolition & Replacement
6Useful Life      P2    
Within 3 Yrs EACH
$95,468Penthouse
D5010-14-01C  Correct Motor 
Starter Deterioration by 
Demolition & Replacement
2Useful Life      P2    
Within 3 Yrs
First Floor Wing C
EACH
$31,823Storage 
Room
D5010-15-01C  Correct 
Disconnect Switch 
Deterioration by Demolition & 
Replacement
1Useful Life     P1    
Within 1 Yr EACH
$2,774Electrical 
Room
D5020-10-01C  Correct 
Building Wide General Lighting 
Inefficient by Demolition & 
Replacement with Alternative 
Product (Bldg SF)
73,406Useful Life      P3    
Within 5 Yrs BLDG SF
$1,801,198Building 
Wide
D5020-16-01C  Correct 
Exterior Building Recessed 
Lighting Deterioration by 
Demolition & Replacement
7Useful Life      P2    
Within 3 Yrs EACH
$12,460Building 
Exterior
D5020-16-02C  Correct 
Exterior Building Wall Mounted 
Lighting Deterioration by 
Demolition & Replacement
26Useful Life      P2    
Within 3 Yrs EACH
$42,647Building 
Exterior
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.  
 CT2000©

Page 28

2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 16 of 19
System Name /                
Corrective Action
Correction Notes Primary 
Justification
 Priority 
(Years)
Quantity / 
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated 
Total Cost 
Jun 19, 2026Date Printed:
Area    
Name
D5020-20-02C  Correct 
Commercial Dimming System 
(1K - 5K SF) Deterioration by 
Demolition & Replacement
3,000Useful Life     P1    
Within 1 Yr
Chair Storage rm next to 
kitchen-  Lutorn DP-2 
dimming control  panel 
QTY-2
SQFT
$35,029Storage 
Room
D5021-01-06C  Correct 
Receptacles (GFCI) Required 
by Install New
32Useful Life     P1    
Within 1 Yr
Counter top outlets near 
sink  in Science labs. EACH
$44,1132nd Floor
D5021-03-03C  Correct 
Branch Wiring Deterioration by 
Demolition & Replacement 
(BLDG SF)
73,406Useful Life      P3    
Within 5 Yrs BLDG SF
$566,841Building 
Wide
D5031-05-01C  Correct 
Building Wide Security System 
Deterioration by Demolition & 
Replacement (Bldg SF)
73,406Useful Life      P2    
Within 3 Yrs BLDG SF
$201,624Building 
Wide
D5031-08-01C  Correct 
Building Wide Video 
Surveillance System 
Deterioration by Demolition & 
Replacement  (BLDG SF)
73,406Useful Life      P2    
Within 3 Yrs BLDG SF
$350,392Building 
Wide
D5032-01-02C  Correct Master 
Clock System Deterioration by 
Demolition & Replacement 
(Bldg SF)
73,406Useful Life      P4  
Within 10 BLDG SF
$274,934Building 
Wide
D5035-04-01C  Correct 
Building-Wide Telephone 
System Deterioration by 
Demolition & Replacement 
(Bldg SF)
73,406Useful Life      P4  
Within 10 BLDG SF
$454,482Building 
Wide
D5090-04-05C  Correct 
Uninterruptable Power Supply 
System (10 KVA) Deterioration 
by Demolition & Replacement
1Useful Life     P1    
Within 1 Yr
Exit/ Em Light battery 
back -inverter system 
Dual Lite CD2A-/20-10-S- 
277v
EACH
$51,997Penthouse
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.  
 CT2000©

Page 29

2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 17 of 19
System Name /                
Corrective Action
Correction Notes Primary 
Justification
 Priority 
(Years)
Quantity / 
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated 
Total Cost 
Jun 19, 2026Date Printed:
Area    
Name
D5090-05-01C  Correct 
Lighting Timeclock 
Deterioration by Demolish & 
Replacement
1Useful Life     P1    
Within 1 Yr
Elect Closet Wing A
EACH
$2,5941st Floor
Subtotal Estimated Cost: D50  Electrical $6,805,852
E20  Furnishings
E2010-01-01C  Correct 
Wardrobe Deterioration by 
Demolition & Replacement
17Useful Life      P2    
Within 3 Yrs
A Wing First Floor - Rms 
S7 & S8, A Wing Second 
Floor - Rms M2 & M5, B 
Wing - First Floor Rms 61-
65, A1-A4 and B Wing 
Second Floor Rms 71-75 
and 81-85.
EACH
$32,628Building 
Wide
E2010-04-01C  Correct Wall 
Cabinet Deterioration by 
Demolition & Replacement
156Useful Life      P2    
Within 3 Yrs
(40 lf) A Wing - First 
Floor - Office Break room, 
Nurse, (16 lf) A Wing - 
Second Floor - Work 
Room, and (100 lf) B 
Wing - First Floor - Rms 
A1-A4.
LNFT
$115,457Building 
Wide
E2010-04-04C  Correct Base 
Cabinet with Laminate Counter 
Deterioration by Demolition & 
Replacement with Alternate 
Material (Solid Surface)
1,273Useful Life      P2    
Within 3 Yrs
(60 lf) A Wing - First 
Floor - Office Break 
Room, Nurse, Rms S7 & 
S8, (23 lf) A Wing - 
Second Floor - Work Rm, 
M2 and M5, (550 lf) B 
Wing - First Floor - Rms 
61-65, A1-A4, and (640 lf) 
B Wing - Second Floor - 
Rms 71-75, 81-85.
LNFT
$1,606,025Building 
Wide
E2010-04-11C  Correct 
Laminate Countertop Only 
Deterioration by Demolition & 
Replacement
65Useful Life      P2    
Within 3 Yrs
A wing second floor.
SQFT
$5,245Building 
Wide
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.  
 CT2000©

Page 30

2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 18 of 19
System Name /                
Corrective Action
Correction Notes Primary 
Justification
 Priority 
(Years)
Quantity / 
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated 
Total Cost 
Jun 19, 2026Date Printed:
Area    
Name
E2010-05-01C  Correct 
Laboratory Casework 
Deterioration by Demolition & 
Replacement
222Useful Life      P3    
Within 5 Yrs
Lower cabinet with epoxy 
counter - (72 lf) B wing 
first floor and (150 lf) B 
wing second floor - Rms 
76 & 86.
LNFT
$600,888Building 
Wide
E2013-03-07C  Correct Indoor 
Motorized Telescopic Bleacher 
Deterioration by Demolition & 
Replacement
450Useful Life      P2    
Within 3 Yrs SEAT
$419,851Building 
Wide
Subtotal Estimated Cost: E20  Furnishings $2,780,095
G20  Site Improvements
G2020-01-02C  Correct 
Bituminous Parking Lot 
Deterioration by Patch & Apply 
Sealcoat
600Damaged / 
Inoperable
     P1    
Within 1 Yr
Drive lane @ south 
elevation SQYD
$841,320Parking Lot
G2020-01-02C  Correct 
Bituminous Parking Lot 
Deterioration by Patch & Apply 
Sealcoat
2,778Damaged / 
Inoperable
      P2    
Within 3 Yrs
North parking lot
SQYD
$3,895,311Parking Lot
G2020-01-02C  Correct 
Bituminous Parking Lot 
Deterioration by Patch & Apply 
Sealcoat
223Damaged / 
Inoperable
      P2    
Within 3 Yrs
Drive lane @ loading dock
SQYD
$312,691Parking Lot
G2030-01-03C  Correct 
Bituminous Sidewalk 
Deterioration by Patch & Install 
Sealcoat
889Damaged / 
Inoperable
      P2    
Within 3 Yrs
Walkway around building 
perimeter. SQYD
$12,469Parking Lot
Subtotal Estimated Cost: G20  Site Improvements $5,061,790
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.  
 CT2000©

Page 31

2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 19 of 19
System Name /                
Corrective Action
Correction Notes Primary 
Justification
 Priority 
(Years)
Quantity / 
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated 
Total Cost 
Jun 19, 2026Date Printed:
Area    
Name
G30  Site Civil Mech Utilities
G3010-03-03C  Correct Site 
Fire Protection Water Service 
Piping (6" Pipe) Required by 
Install New
365Best 
Practice / 
Standard
      P2    
Within 3 Yrs
Item 4 of 4 required to 
provide sprinkler system. 
Quantity is estimated with 
125 LNFT from bldg to 
new pump house and 240 
LNFT to main line.
LNFT
$74,112Building 
Property
Subtotal Estimated Cost: G30  Site Civil Mech Utilities $74,112
H10  Space Requirements
H1010-35-01C  Correct Pump 
House Required by Add New
180Best 
Practice / 
Standard
      P2    
Within 3 Yrs
Item 2 of 4 required to 
provide sprinkler system. SQFT
$22,943Building 
Property
Subtotal Estimated Cost: H10  Space Requirements $22,943
Z10  General Requirements
Z1040-01-01C  Correct 
Investigation Consultant 
Services Required by 
Contracting Appropriate AE 
Professionals
6Useful Life     P1    
Within 1 Yr
Allowance to replace (2) 
existing food service / 
kitchen serving lines.  
Existing units are 
inoperable. Quantity is 
estimated.
LPSM
$103,950Kitchen
Subtotal Estimated Cost: Z10  General Requirements $103,950
Granby Middle School Total Estimated Cost: $27,448,112
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.  
 CT2000©

Page 32

BuildingFullNam BAreaName Ar SystemType SysteSubsyst ComponenCorrectionName Quantity UnitOfMReason Reason1 Priorit Prio CorrectionNotes CorrectionCatego Ye Pr St PrEst Constr Cost Lowst Constr Cost High
Granby Middle S M Building Exterior Building Envelope & Structure B20   B2010  E  B2010-03    B2010-03-07C  Correct Brick Masonry Wall Stained Finish by Cleaning 2,000 SQFT Damaged / Ino 1 P1      Northeast interior corner e   Cap Renewal UnNoUn 22,358.80$         24,594.68$        
Granby Middle S M Building Exterior Building Envelope & Structure B20   B2010  E  B2010-03    B2010-03-07C  Correct Brick Masonry Wall Stained Finish by Cleaning 900 SQFT Damaged / Ino 1 P1      East Elevation A Wing. Cap Renewal UnNoUn 10,061.46$         11,067.61$        
Granby Middle S M Building Exterior Building Envelope & Structure B20   B2010  E  B2010-03    B2010-03-07C  Correct Brick Masonry Wall Stained Finish by Cleaning 50 SQFT Damaged / Ino 1 P1      East Elevation B Wing Cap Renewal UnNoUn 558.97$              614.87$              
Granby Middle S M Building Exterior Building Envelope & Structure B20   B2010  E  B2010-03    B2010-03-07C  Correct Brick Masonry Wall Stained Finish by Cleaning 50 SQFT Damaged / Ino 1 P1      North Elevation B Wing Cap Renewal UnNoUn 558.97$              614.87$              
Granby Middle S M Building Exterior Building Envelope & Structure B20   B2010  E  B2010-03    B2010-03-07C  Correct Brick Masonry Wall Stained Finish by Cleaning 40 SQFT Damaged / Ino 1 P1      East Elevation B Wing (outs   Cap Renewal UnNoUn 447.18$              491.89$              
Granby Middle S M Building Exterior Building Envelope & Structure B20   B2020  E  B2020-02  A   B2020-02-01C  Correct Aluminum Frame Window Deterioration by Demolition & Replac 3,500 SQFT Useful Life 2 P2      All exterior windows in the          Cap Renewal UnNoUn 844,834.90$      929,318.39$      
Granby Middle S M Building Exterior Building Envelope & Structure B20   B2020  E  B2020-05  A   B2020-05-01C  Correct Aluminum Storefront System Deterioration by Demolition & Rep 440 SQFT Useful Life 4 P4    A & C wings - south elevatio  Cap Renewal UnNoUn 225,564.24$      248,120.66$      
Granby Middle S M Building Wide Building Envelope & Structure B20   B2020  E  B2020-05  A   B2020-05-03C  Correct Aluminum Storefront System Finish Deterioration by Prep & Ref 440 SQFT Damaged / Ino 2 P2      Prime and Paint. A & C wing     Cap Renewal UnNoUn 17,434.52$         19,177.97$        
Granby Middle S M Building Exterior Building Envelope & Structure B20   B2020  E  B2020-05  A   B2020-05-03C  Correct Aluminum Storefront System Finish Deterioration by Prep & Ref 440 SQFT Damaged / Ino 1 P1      A & C wings - south elevatio  Cap Renewal UnNoUn 17,434.52$         19,177.97$        
Granby Middle S M Building Exterior Building Envelope & Structure B20   B2021  E   B2021-01   B2021-01-07C  Correct Window General Moisture or Air Infiltration by Recaulking 60 LNFT Damaged / Ino 1 P1      A & C Wings - south elevati  Cap Renewal UnNoUn 1,134.14$           1,247.56$           
Granby Middle S M Building Exterior Building Envelope & Structure B20   B2021  E   B2021-01   B2021-01-10C  Correct Window General Lintel Finish Deterioration by Prep & Refinish 620 LNFT Damaged / Ino 2 P2      All exterior doors and wind Cap Renewal UnNoUn 5,608.52$           6,169.37$           
Granby Middle S M Building Exterior Building Envelope & Structure B20   B2021  E   B2021-01   B2021-01-10C  Correct Window General Lintel Finish Deterioration by Prep & Refinish 170 LNFT Damaged / Ino 2 P2      At brick on the North and E            Cap Renewal UnNoUn 1,537.82$           1,691.60$           
Granby Middle S M Building Exterior Building Envelope & Structure B20   B2030  E  B2030-04    B2030-04-02C  Correct Hollow Metal Door & Frame Deterioration by Demolition & Repl 1 EACH Useful Life 1 P1      Gym Vestibule North Elevat        Cap Renewal UnNoUn 8,996.52$           9,896.17$           
Granby Middle S M Building Exterior Building Envelope & Structure B20   B2030  E  B2030-04    B2030-04-03C  Correct Hollow Metal Door & Frame Finish Deterioration by Prep & Refin 12 EACH Damaged / Ino 2 P2      All exterior doors Cap Renewal UnNoUn 6,233.51$           6,856.86$           
Granby Middle S M Building Exterior Building Envelope & Structure B20   B2030  E  B2030-08   B2030-08-02C  Correct Overhead Door & Frame Deterioration by Demolition & Replace 160 SQFT Useful Life 2 P2      (1) Maintenance and (1) Ind  Cap Renewal UnNoUn 31,685.84$         34,854.42$        
Granby Middle S M Roof Building Envelope & Structure B30  B3060  R  B3060-03  B3060-03-03C  Correct Historic Cupola Deterioration by Restoration & Refinish 75 SQFT Damaged / Ino 1 P1      Cap Renewal UnNoUn 4,633.58$           5,096.93$           
Granby Middle S M Classroom Architectural Interiors & Finishes C10   C1011  I   C1011-01  A   C1011-01-03C  Correct Accordion Folding Partition Not Required by Infill 800 SQFT Damaged / Ino 3 P3      Inoperable and not desired                     Cap Renewal UnNoUn 54,759.60$         60,235.56$        
Granby Middle S M Gymnasium Architectural Interiors & Finishes C10   C1011  I   C1011-01  A   C1011-01-04C  Correct Accordion Folding Partition Deterioration by Demolition & Repla    1,800 SQFT Useful Life 2 P2      Replace w/ roll down divide  Cap Renewal UnNoUn 273,123.90$      300,436.29$      
Granby Middle S M Building Wide Architectural Interiors & Finishes C10   C1020  I  C1020-01    C1020-01-01C  Correct Hollow Metal Door Deterioration by Demolition & Replacement 1 EACH Useful Life 2 P2      A Wing - Choral room to co Cap Renewal UnNoUn 4,111.92$           4,523.11$           
Granby Middle S M Building Wide Architectural Interiors & Finishes C10   C1020  I  C1020-01    C1020-01-03C  Correct Hollow Metal Door Finish Deterioration by Prep & Refinish 145 EACH Damaged / Ino 2 P2      FRAME ONLY - All interior d                                   Cap Renewal UnNoUn 93,871.26$         103,258.39$      
Granby Middle S M Building Wide Architectural Interiors & Finishes C10   C1020  I  C1020-01    C1020-01-03C  Correct Hollow Metal Door Finish Deterioration by Prep & Refinish 4 EACH Damaged / Ino 2 P2      B Wing - 6th grade stair and       Cap Renewal UnNoUn 2,589.55$           2,848.51$           
Granby Middle S M Building Wide Architectural Interiors & Finishes C10   C1020  I  C1020-02  W  C1020-02-01C  Correct Wood Door Deterioration by Demolition & Replacement 24 EACH Useful Life 4 P4    A Wing First Floor. Wood ve     Cap Renewal UnNoUn 70,460.71$         77,506.78$        
Granby Middle S M Building Wide Architectural Interiors & Finishes C10   C1020  I  C1020-02  W  C1020-02-01C  Correct Wood Door Deterioration by Demolition & Replacement 23 EACH Useful Life 4 P4    C Wing Cap Renewal UnNoUn 67,524.85$         74,277.33$        
Granby Middle S M Building Wide Architectural Interiors & Finishes C10   C1020  I  C1020-02  W  C1020-02-01C  Correct Wood Door Deterioration by Demolition & Replacement 19 EACH Useful Life 4 P4    B Wing Second Floor - Woo      Cap Renewal UnNoUn 55,781.40$         61,359.54$        
Granby Middle S M Building Wide Architectural Interiors & Finishes C10   C1020  I  C1020-02  W  C1020-02-01C  Correct Wood Door Deterioration by Demolition & Replacement 18 EACH Useful Life 2 P2      All toilet rooms and Nurse S                        Cap Renewal UnNoUn 52,845.53$         58,130.09$        
Granby Middle S M Building Wide Architectural Interiors & Finishes C10   C1020  I  C1020-02  W  C1020-02-01C  Correct Wood Door Deterioration by Demolition & Replacement 18 EACH Useful Life 4 P4    A Wing Second Floor - Woo      Cap Renewal UnNoUn 52,845.53$         58,130.09$        
Granby Middle S M Building Wide Architectural Interiors & Finishes C10   C1020  I  C1020-02  W  C1020-02-01C  Correct Wood Door Deterioration by Demolition & Replacement 18 EACH Useful Life 4 P4    B Wing Second Floor - Woo      Cap Renewal UnNoUn 52,845.53$         58,130.09$        
Granby Middle S M Restroom Architectural Interiors & Finishes C10   C1030  F   C1030-02  T  C1030-02-01C  Correct Toilet Compartment Deterioration by Demolition & Replacemen 31 EACH Useful Life 4 P4    All multiple fixture toilet rooCap Renewal UnNoUn 69,301.23$         76,231.35$        
Granby Middle S M Locker Room Architectural Interiors & Finishes C10   C1030  F   C1030-07  C1030-07-03C  Correct Athletic Locker Deterioration by Demolition & Replacement 336 EACH Useful Life 4 P4    Boys Locker Room. Cap Renewal UnNoUn 400,038.17$      440,041.99$      
Granby Middle S M Locker Room Architectural Interiors & Finishes C10   C1030  F   C1030-07  C1030-07-03C  Correct Athletic Locker Deterioration by Demolition & Replacement 333 EACH Useful Life 4 P4    Girls Locker Room. Cap Renewal UnNoUn 396,466.40$      436,113.04$      
Granby Middle S M Stair Tower Architectural Interiors & Finishes C20    C2050  I    C2050-01    C2050-01-03C  Correct Handrail Finish Deterioration by Prep & Refinish 260 LNFT Damaged / Ino 2 P2      (50 lf) A Wing Open Stair, (5                   Cap Renewal UnNoUn 8,169.54$           8,986.49$           
Granby Middle S M Classroom Architectural Interiors & Finishes C30   C3020  F  C3020-02     C3020-02-01C  Correct Resilient Tile Floor Finish Deterioration by Demolition & Replace 23,600 SQFT Useful Life 3 P3      A Wing - First Floor Nurse, R                               Cap Renewal UnNoUn 336,389.68$      370,028.65$      
Granby Middle S M Cafeteria Architectural Interiors & Finishes C30   C3020  F  C3020-02     C3020-02-01C  Correct Resilient Tile Floor Finish Deterioration by Demolition & Replace 2,400 SQFT Useful Life 2 P2      A wing Cap Renewal UnNoUn 34,209.12$         37,630.03$        
Granby Middle S M Stair Tower Architectural Interiors & Finishes C30   C3020  F  C3020-02     C3020-02-01C  Correct Resilient Tile Floor Finish Deterioration by Demolition & Replace 125 SQFT Useful Life 2 P2      B Wing - 2nd floor, 6th grad  Cap Renewal UnNoUn 1,781.73$           1,959.90$           
Granby Middle S M Stair Tower Architectural Interiors & Finishes C30   C3020  F  C3020-02     C3020-02-01C  Correct Resilient Tile Floor Finish Deterioration by Demolition & Replace 125 SQFT Useful Life 2 P2      B wing northwest stair - 2nd Cap Renewal UnNoUn 1,781.73$           1,959.90$           
Granby Middle S M Gymnasium Architectural Interiors & Finishes C30   C3020  F  C3020-11     C3020-11-02C  Correct Hard Wood Floor Finish Deterioration Prep & Refinish 6,300 SQFT Damaged / Ino 4 P4    Main Gym. Cap Renewal UnNoUn 67,770.99$         74,548.09$        
Granby Middle S M Gymnasium Architectural Interiors & Finishes C30   C3020  F  C3020-11     C3020-11-02C  Correct Hard Wood Floor Finish Deterioration Prep & Refinish 1,500 SQFT Damaged / Ino 3 P3      Auxiliary Gym. Cap Renewal UnNoUn 16,135.95$         17,749.55$        
Granby Middle S M Building Wide Architectural Interiors & Finishes C30   C3020  F  C3020-12  C   C3020-12-01C  Correct Carpet Floor Finish Deterioration by Demolition & Replacement 29 SQYD Useful Life 3 P3      Second Floor - 8th gtrade co  Cap Renewal UnNoUn 4,715.94$           5,187.54$           
Granby Middle S M Building Wide Architectural Interiors & Finishes C30   C3020  F  C3020-12  C   C3020-12-01C  Correct Carpet Floor Finish Deterioration by Demolition & Replacement 29 SQYD Useful Life 2 P2      First Floor - Arts Faculty Cap Renewal UnNoUn 4,715.94$           5,187.54$           
Granby Middle S M Building Wide Architectural Interiors & Finishes C30   C3020  F  C3020-12  C   C3020-12-01C  Correct Carpet Floor Finish Deterioration by Demolition & Replacement 27 SQYD Useful Life 2 P2      First floor - (75 sqft) Office S         Cap Renewal UnNoUn 4,390.70$           4,829.78$           
Granby Middle S M Building Wide Architectural Interiors & Finishes C30   C3020  F  C3020-12  C   C3020-12-01C  Correct Carpet Floor Finish Deterioration by Demolition & Replacement 19 SQYD Useful Life 2 P2      6th grade stair walk off carp    Cap Renewal UnNoUn 3,089.76$           3,398.73$           
Granby Middle S M Building Wide Elevators & Lifts D10  D1010    D1010-01   D1010-01-03C  Correct Hydraulic Passenger Elevator (2500 Capacity) Deterioration by D   2 FLR Useful Life 2 P2      Cap Renewal UnNoUn 159,226.80$      175,149.48$      
Granby Middle S M Building Wide Mechanical & Plumbing D20  D2010   D2010-01       D2010-01-01C  Correct Building Wide Plumbing Fixtures & Trim Deterioration by Demol     73,406 BLDG SF Useful Life 4 P4    Cap Renewal UnNoUn 347,760.93$      382,537.02$      
Granby Middle S M Building Wide Mechanical & Plumbing D20  D2020    D2020-01        D2020-01-01C  Correct Domestic Water Piping & Valves & Insulation Deterioration by D     73,406 BLDG SF Useful Life 4 P4    Cap Renewal UnNoUn 1,707,526.33$   1,878,278.96$   
Granby Middle S M Boiler Room Mechanical & Plumbing D20  D2020    D2020-06   D2020-06-01C  Correct Plumbing Pump Deterioration by Demolition & Replacement 1 EACH Useful Life 4 P4    Taco Cap Renewal UnNoUn 8,725.07$           9,597.58$           
Granby Middle S M Boiler Room Mechanical & Plumbing D20  D2020    D2020-08    D2020-08-14C  Correct Domestic Water Heater (120 Gal Electric) Deterioration by Demo   3 EACH Useful Life 4 P4    AO Smith M/N DRE-120 100  Cap Renewal UnNoUn 82,348.89$         90,583.78$        
Granby Middle S M Roof Mechanical & Plumbing D30  D3010   D3010-05     D3010-05-02C  Correct Natural Gas Distribution Piping Pipe Surface Deterioration by Pr   150 LNFT Useful Life 3 P3      Cap Renewal UnNoUn 5,319.02$           5,850.92$           
Granby Middle S M Roof Mechanical & Plumbing D30  D3030  D3030-04   D3030-04-04C  Correct Condensing Unit (20 Tons) Deterioration by Demolition & Replac 1 EACH Useful Life 1 P1      CU-3 13 Tons connected to           Cap Renewal UnNoUn 66,906.93$         73,597.62$        
Granby Middle S M Roof Mechanical & Plumbing D30  D3030  D3030-04   D3030-04-04C  Correct Condensing Unit (20 Tons) Deterioration by Demolition & Replac 1 EACH Useful Life 1 P1      CU-2 18 Tons connected to           Cap Renewal UnNoUn 66,906.93$         73,597.62$        
Granby Middle S M Roof Mechanical & Plumbing D30  D3030  D3030-04   D3030-04-05C  Correct Condensing Unit (30 Tons) Deterioration by Demolition & Replac 1 EACH Useful Life 1 P1      CU-4 25 Tons connected to           Cap Renewal UnNoUn 91,191.54$         100,310.69$      
Granby Middle S M Roof Mechanical & Plumbing D30  D3030  D3030-04   D3030-04-10C  Correct Condensing Unit (80 Tons) Deterioration by Demolition & Replac 1 EACH Useful Life 1 P1      CU-1 71 Tons connected to           Cap Renewal UnNoUn 178,756.03$      196,631.63$      
Granby Middle S M Roof Mechanical & Plumbing D30  D3040   D3040-01   D3040-01-01C  Correct Supply Fan (.5 HP) Deterioration by Demolition & Replacement 1 EACH Useful Life 4 P4    Cook Supply for KEF-1 label  Cap Renewal UnNoUn 9,836.45$           10,820.09$        
Granby Middle S M Roof Mechanical & Plumbing D30  D3040   D3040-01   D3040-01-03C  Correct Supply Fan (2 HP) Deterioration by Demolition & Replacement 1 EACH Useful Life 2 P2      SF-2  1.5 HP size taken from  Cap Renewal UnNoUn 14,311.47$         15,742.62$        
Granby Middle S M Penthouse Mechanical & Plumbing D30  D3040   D3040-02    D3040-02-15C  Correct Air Handling Unit (75 Tons) Deterioration by Demolition & Repla 1 EACH Useful Life 2 P2      AH-1 71 Tons McQuay M/N         Cap Renewal UnNoUn 316,696.74$      348,366.42$      
Granby Middle S M Roof Mechanical & Plumbing D30  D3040   D3040-02    D3040-02-20C  Correct Air Handling Unit Heating Only (2000 CFM) Deterioration by Dem   1 EACH Useful Life 1 P1      RTU-1 McQuay 2200 CFM M    Cap Renewal UnNoUn 49,019.76$         53,921.73$        
Granby Middle S M Roof Mechanical & Plumbing D30  D3040   D3040-02    D3040-02-22C  Correct Air Handling Unit Heating Only (4000 CFM) Deterioration by Dem   1 EACH Useful Life 1 P1      RTU-8 3500 CFM McQuay M    Cap Renewal UnNoUn 63,499.61$         69,849.57$        
Granby Middle S M Roof Mechanical & Plumbing D30  D3040   D3040-02    D3040-02-23C  Correct Air Handling Unit Heating Only (5000 CFM) Deterioration by Dem   1 EACH Useful Life 1 P1      RTU-4 McQuay M/N RDS70   Cap Renewal UnNoUn 74,921.26$         82,413.39$        
Granby Middle S M Penthouse Mechanical & Plumbing D30  D3040   D3040-02    D3040-02-24C  Correct Air Handling Unit Heating Only (6000 CFM) Deterioration by Dem   1 EACH Useful Life 2 P2      AH-3 5400 CFM McQuay M       Cap Renewal UnNoUn 87,125.40$         95,837.94$        
Granby Middle S M Penthouse Mechanical & Plumbing D30  D3040   D3040-02    D3040-02-24C  Correct Air Handling Unit Heating Only (6000 CFM) Deterioration by Dem   1 EACH Useful Life 2 P2      AH-2 McQuay M/N LHD111      Cap Renewal UnNoUn 87,125.40$         95,837.94$        
Granby Middle S M Roof Mechanical & Plumbing D30  D3040   D3040-02    D3040-02-25C  Correct Air Handling Unit Heating Only (7000 CFM) Deterioration by Dem   1 EACH Useful Life 1 P1      RTU-3 McQuay 6500 CFM M    Cap Renewal UnNoUn 122,636.19$      134,899.81$      
Granby Middle S M Penthouse Mechanical & Plumbing D30  D3040   D3040-02    D3040-02-25C  Correct Air Handling Unit Heating Only (7000 CFM) Deterioration by Dem   1 EACH Useful Life 2 P2      AH-4 6150 CFM McQuay M       Cap Renewal UnNoUn 122,636.19$      134,899.81$      
Granby Middle S M Penthouse Mechanical & Plumbing D30  D3040   D3040-02    D3040-02-25C  Correct Air Handling Unit Heating Only (7000 CFM) Deterioration by Dem   1 EACH Useful Life 2 P2      AH-5 6400 CFM McQuay M       Cap Renewal UnNoUn 122,636.19$      134,899.81$      
Granby Middle S M Roof Mechanical & Plumbing D30  D3040   D3040-02    D3040-02-25C  Correct Air Handling Unit Heating Only (7000 CFM) Deterioration by Dem   1 EACH Useful Life 1 P1      RTU-2 McQuay 6500 CFM M    Cap Renewal UnNoUn 122,636.19$      134,899.81$      
Granby Middle S M Building Wide Mechanical & Plumbing D30  D3040   D3040-04    D3040-04-01C  Correct VAV Terminal Unit Deterioration by Demolition & Replacement 8 EACH Useful Life 2 P2      Cap Renewal UnNoUn 57,146.79$         62,861.47$        
Granby Middle S M Building Wide Mechanical & Plumbing D30  D3040   D3040-04    D3040-04-03C  Correct VAV Terminal Unit with HW Reheat Deterioration by Demolition  20 EACH Useful Life 2 P2      Cap Renewal UnNoUn 189,141.40$      208,055.54$      
Granby Middle S M Penthouse Mechanical & Plumbing D30  D3040   D3040-07    D3040-07-03C  Correct Return Air or Inline Fan (3 HP) Deterioration by Demolition & Re 4 EACH Useful Life 2 P2      McQuay RAF-2, RAF-3, RAF-   Cap Renewal UnNoUn 76,118.58$         83,730.44$        
Granby Middle S M Penthouse Mechanical & Plumbing D30  D3040   D3040-07    D3040-07-07C  Correct Return Air or Inline Fan (15 HP) Deterioration by Demolition & R 1 EACH Useful Life 2 P2      RAF-1 McQuay Cap Renewal UnNoUn 40,318.86$         44,350.74$        
Granby Middle S M Roof Mechanical & Plumbing D30  D3040   D3040-09     D3040-09-03C  Correct Exhaust or Induction Fan (1/5 HP) Deterioration by Demolition & 5 EACH Useful Life 2 P2      1/6 HP EF-2, 3, 9, 13, & 15 s     Cap Renewal UnNoUn 39,756.38$         43,732.02$        
Granby Middle S M Roof Mechanical & Plumbing D30  D3040   D3040-09     D3040-09-05C  Correct Exhaust or Induction Fan (1/2 HP) Deterioration by Demolition & 2 EACH Useful Life 2 P2      EF-6 & 10 size taken from o  Cap Renewal UnNoUn 16,972.19$         18,669.41$        
Granby Middle S M Roof Mechanical & Plumbing D30  D3040   D3040-09     D3040-09-05C  Correct Exhaust or Induction Fan (1/2 HP) Deterioration by Demolition & 2 EACH Useful Life 2 P2      1/4 HP EF-9 & 12 size taken   Cap Renewal UnNoUn 16,972.19$         18,669.41$        
Granby Middle S M Roof Mechanical & Plumbing D30  D3040   D3040-09     D3040-09-05C  Correct Exhaust or Induction Fan (1/2 HP) Deterioration by Demolition & 1 EACH Useful Life 2 P2      1/3 HP EF-4 size taken from  Cap Renewal UnNoUn 8,486.10$           9,334.71$           
Granby Middle S M Roof Mechanical & Plumbing D30  D3040   D3040-09     D3040-09-07C  Correct Exhaust or Induction Fan (3/4 HP) Deterioration by Demolition & 3 EACH Useful Life 2 P2      EF-5, 8, & 11 size taken from  Cap Renewal UnNoUn 30,198.92$         33,218.81$        
Granby Middle S M Roof Mechanical & Plumbing D30  D3040   D3040-09     D3040-09-09C  Correct Exhaust or Induction Fan (1 HP) Deterioration by Demolition & R 1 EACH Useful Life 2 P2      EF-1 size taken from origina  Cap Renewal UnNoUn 8,447.94$           9,292.74$           
Granby Middle S M Roof Mechanical & Plumbing D30  D3040   D3040-09     D3040-09-11C  Correct Exhaust or Induction Fan (3 HP) Deterioration by Demolition & R 1 EACH Useful Life 4 P4    KEF-1  Cook Cap Renewal UnNoUn 11,604.64$         12,765.11$        
Granby Middle S M Roof Mechanical & Plumbing D30  D3040   D3040-10     D3040-10-01C  Correct Roof Mounted Gravity Vent Deterioration by Demolition & Repla 5 EACH Useful Life 3 P3      Cap Renewal UnNoUn 34,936.36$         38,430.00$        
Granby Middle S M Building Wide Mechanical & Plumbing D30  D3040   D3040-13    D3040-13-04C  Correct Ductwork & Insulation Deterioration by Duct Cleaning Building W   73,406 BLDG SF Environ Imprv 2 P2      Cap Renewal UnNoUn 248,295.80$      273,125.37$      
Granby Middle S M Roof Mechanical & Plumbing D30  D3040   D3040-13    D3040-13-08C  Correct Ductwork & Insulation (Exterior) Deterioration by Demolition & 100 SQFT Useful Life 1 P1      Connected to RTU-7 Cap Renewal UnNoUn 9,669.77$           10,636.75$        
Granby Middle S M Roof Mechanical & Plumbing D30  D3050  T    D3050-01        D3050-01-06C  Correct Packaged Rooftop Air Conditioning & Heating Unit (15 Ton) Dete     1 EACH Useful Life 1 P1      RTU-6 13 Tons McQuay M/      Cap Renewal UnNoUn 81,421.02$         89,563.12$        

Page 33

Granby Middle S M Roof Mechanical & Plumbing D30  D3050  T    D3050-01        D3050-01-07C  Correct Packaged Rooftop Air Conditioning & Heating Unit (20 Ton) Dete     1 EACH Useful Life 2 P2      RTU-5 McQuay 18 Tons M/      Cap Renewal UnNoUn 118,217.46$      130,039.20$      
Granby Middle S M Roof Mechanical & Plumbing D30  D3050  T    D3050-01        D3050-01-08C  Correct Packaged Rooftop Air Conditioning & Heating Unit (30 Ton) Dete     1 EACH Useful Life 3 P3      RTU-7 McQuay 25 Tons M/      Cap Renewal UnNoUn 212,424.93$      233,667.43$      
Granby Middle S M Building Wide Mechanical & Plumbing D30  D3050  T    D3050-19   D3050-19-01C  Correct Cabinet Heater Deterioration by Demolition & Replacement 10 EACH Useful Life 1 P1      Quantity taken from origina  Cap Renewal UnNoUn 123,229.33$      135,552.26$      
Granby Middle S M Gymnasiums Mechanical & Plumbing D30  D3050  T    D3050-20       D3050-20-04C  Correct Steam & Hot Water Unit Heater (200 MBH) Deterioration by Dem   6 EACH Useful Life 2 P2      Cap Renewal UnNoUn 48,691.06$         53,560.17$        
Granby Middle S M Audio Visual Mechanical & Plumbing D30  D3050  T    D3050-21        D3050-21-11C  Correct Ductless Air to Air Split System Heat Pump (1.5 Ton) Deterioratio     1 EACH Useful Life 2 P2      Mitsubishi M/N PKA-A18GA   Cap Renewal UnNoUn 7,177.21$           7,894.93$           
Granby Middle S M Technology Lab Mechanical & Plumbing D30  D3050  T    D3050-21        D3050-21-12C  Correct Ductless Air to Air Split System Heat Pump (3 Ton) Deterioration    1 EACH Useful Life 2 P2      Mitsubishi M/N PUG36BKB  Cap Renewal UnNoUn 16,350.71$         17,985.78$        
Granby Middle S M Building Wide Mechanical & Plumbing D30  D3050  T    D3050-26       D3050-26-01C  Correct Steam or Hot Water Fin-Tube Radiation Deterioration by Demol   922 LNFT Useful Life 2 P2      Cap Renewal UnNoUn 373,242.66$      410,566.92$      
Granby Middle S M Building Wide Mechanical & Plumbing D30  D3060     D3060-02    D3060-02-03C  Correct Electronic Control (DDC) System Deterioration by Demolition &   55,055 BLDG SF Useful Life 1 P1      Honeywell Niagra system Cap Renewal UnNoUn 1,050,818.27$   1,155,900.10$   
Granby Middle S M Building Wide Mechanical & Plumbing D30  D3060     D3060-03    D3060-03-02C  Correct Local Control System Deterioration by Demolition & Replacemen    18,352 BLDG SF Useful Life 1 P1      Cap Renewal UnNoUn 327,429.04$      360,171.95$      
Granby Middle S M Exterior Mechanical & Plumbing D30  D3090  O      D3090-01    D3090-01-01C  Correct Dust Collection System Deterioration by Demolition & Replacem 1 EACH Useful Life 3 P3      Donldson Cap Renewal UnNoUn 4,987.75$           5,486.52$           
Granby Middle S M A2 Technology Mechanical & Plumbing D30  D3090  O      D3090-06    D3090-06-01C  Correct Industrial Air Cleaner Deterioration by Demolition & Replaceme 2 EACH Useful Life 2 P2      Airomax Cap Renewal UnNoUn 11,464.68$         12,611.15$        
Granby Middle S M Building Wide Fire Alarm & Protection D40   D4010  SD4010-01     D4010-01-02C  Correct Wet Pipe Sprinkler System Required by Install New (Bldg SF) 67,306 BLDG SF Best Practice / Life Safety 2 P2      Item 1 of 4 required to prov        Cap Imprv UnNoUn 824,330.24$      906,763.26$      
Granby Middle S M Building Property Fire Alarm & Protection D40   D4010  SD4010-03   D4010-03-09C  Correct Diesel Drive Fire Pump, 60 HP, Required by Install New 1 EACH Best Practice / Life Safety 2 P2      Item 3 of 4 required to prov      Cap Imprv UnNoUn 229,573.06$      252,530.36$      
Granby Middle S M 1st Floor Electrical, Technology, & Security D50  D5010     D5010-04   D5010-04-07C  Correct Secondary Transformer (45 kVA) Deterioration by Demolition & 1 EACH Useful Life 1 P1      Elect Closet Wing A Cap Renewal UnNoUn 17,385.11$         19,123.62$        
Granby Middle S M Electrical Room Electrical, Technology, & Security D50  D5010     D5010-04   D5010-04-07C  Correct Secondary Transformer (45 kVA) Deterioration by Demolition & 1 EACH Useful Life 1 P1      Cap Renewal UnNoUn 17,385.11$         19,123.62$        
Granby Middle S M Penthouse Electrical, Technology, & Security D50  D5010     D5010-04   D5010-04-09C  Correct Secondary Transformer (112.5 kVA) Deterioration by Demolition  1 EACH Useful Life 2 P2      Cap Renewal UnNoUn 37,334.22$         41,067.64$        
Granby Middle S M Electrical Room Electrical, Technology, & Security D50  D5010     D5010-04   D5010-04-10C  Correct Secondary Transformer (150 kVA) Deterioration by Demolition & 1 EACH Useful Life 1 P1      Cap Renewal UnNoUn 39,263.29$         43,189.62$        
Granby Middle S M Electrical Room Electrical, Technology, & Security D50  D5010     D5010-05    D5010-05-05C  Correct Main Distribution Panel (1600 AMP) Deterioration by Demolition  1 EACH Useful Life 1 P1      Cap Renewal UnNoUn 108,603.68$      119,464.04$      
Granby Middle S M Electrical Room Electrical, Technology, & Security D50  D5010     D5010-06    D5010-06-05C  Correct Main Disconnect Switch (1600 AMP) Deterioration by Demolitio   1 EACH Useful Life 1 P1      Cap Renewal UnNoUn 70,760.77$         77,836.85$        
Granby Middle S M Penthouse Electrical, Technology, & Security D50  D5010     D5010-08    D5010-08-21C  Correct Motor Control Center Variable Frequency Drive (20 HP) Deterior     2 EACH Useful Life 2 P2      Cap Renewal UnNoUn 35,225.33$         38,747.86$        
Granby Middle S M Electrical Room Electrical, Technology, & Security D50  D5010     D5010-09    D5010-09-12C  Correct Automatic Transfer Switch (1600 AMP) Deterioration by Demolit   1 EACH Useful Life 4 P4    Cap Renewal UnNoUn 78,857.45$         86,743.19$        
Granby Middle S M Building Wide Electrical, Technology, & Security D50  D5010     D5010-10   D5010-10-04C  Correct Distribution Wiring Deterioration by Demolition & Replacement  73,406 BLDG SF Useful Life 3 P3      Cap Renewal UnNoUn 1,637,680.52$   1,801,448.57$   
Granby Middle S M 1st Floor Electrical, Technology, & Security D50  D5010     D5010-12  D5010-12-05C  Correct Panelboard (225 AMP) Deterioration by Demolition & Replacem 4 EACH Useful Life 1 P1      Wing B Cap Renewal UnNoUn 67,380.13$         74,118.14$        
Granby Middle S M Electrical Room Electrical, Technology, & Security D50  D5010     D5010-12  D5010-12-05C  Correct Panelboard (225 AMP) Deterioration by Demolition & Replacem 4 EACH Useful Life 1 P1      Cap Renewal UnNoUn 67,380.13$         74,118.14$        
Granby Middle S M Penthouse Electrical, Technology, & Security D50  D5010     D5010-12  D5010-12-05C  Correct Panelboard (225 AMP) Deterioration by Demolition & Replacem 3 EACH Useful Life 2 P2      Cap Renewal UnNoUn 50,535.09$         55,588.60$        
Granby Middle S M 1st Floor Electrical, Technology, & Security D50  D5010     D5010-12  D5010-12-05C  Correct Panelboard (225 AMP) Deterioration by Demolition & Replacem 2 EACH Useful Life 1 P1      Elect Closet Wing A Cap Renewal UnNoUn 33,690.06$         37,059.07$        
Granby Middle S M 2nd Floor Electrical, Technology, & Security D50  D5010     D5010-12  D5010-12-05C  Correct Panelboard (225 AMP) Deterioration by Demolition & Replacem 2 EACH Useful Life 1 P1      Wing B Cap Renewal UnNoUn 33,690.06$         37,059.07$        
Granby Middle S M 2nd Floor Electrical, Technology, & Security D50  D5010     D5010-12  D5010-12-05C  Correct Panelboard (225 AMP) Deterioration by Demolition & Replacem 2 EACH Useful Life 1 P1      Wing A Cap Renewal UnNoUn 33,690.06$         37,059.07$        
Granby Middle S M Kitchen Electrical, Technology, & Security D50  D5010     D5010-12  D5010-12-05C  Correct Panelboard (225 AMP) Deterioration by Demolition & Replacem 2 EACH Useful Life 1 P1      Cap Renewal UnNoUn 33,690.06$         37,059.07$        
Granby Middle S M Penthouse Electrical, Technology, & Security D50  D5010     D5010-14   D5010-14-01C  Correct Motor Starter Deterioration by Demolition & Replacement 8 EACH Useful Life 2 P2      Cap Renewal UnNoUn 115,718.82$      127,290.70$      
Granby Middle S M Penthouse Electrical, Technology, & Security D50  D5010     D5010-14   D5010-14-01C  Correct Motor Starter Deterioration by Demolition & Replacement 6 EACH Useful Life 2 P2      Cap Renewal UnNoUn 86,789.11$         95,468.02$        
Granby Middle S M Electrical Room Electrical, Technology, & Security D50  D5010     D5010-14   D5010-14-01C  Correct Motor Starter Deterioration by Demolition & Replacement 3 EACH Useful Life 1 P1      Cap Renewal UnNoUn 43,394.56$         47,734.01$        
Granby Middle S M Kitchen Electrical, Technology, & Security D50  D5010     D5010-14   D5010-14-01C  Correct Motor Starter Deterioration by Demolition & Replacement 2 EACH Useful Life 1 P1      Cap Renewal UnNoUn 28,929.70$         31,822.67$        
Granby Middle S M 1st Floor Electrical, Technology, & Security D50  D5010     D5010-14   D5010-14-01C  Correct Motor Starter Deterioration by Demolition & Replacement 2 EACH Useful Life 1 P1      Elect Closet Wing A Cap Renewal UnNoUn 28,929.70$         31,822.67$        
Granby Middle S M Storage Room Electrical, Technology, & Security D50  D5010     D5010-14   D5010-14-01C  Correct Motor Starter Deterioration by Demolition & Replacement 2 EACH Useful Life 2 P2      First Floor Wing C Cap Renewal UnNoUn 28,929.70$         31,822.67$        
Granby Middle S M Electrical Room Electrical, Technology, & Security D50  D5010     D5010-15   D5010-15-01C  Correct Disconnect Switch Deterioration by Demolition & Replacement 1 EACH Useful Life 1 P1      Cap Renewal UnNoUn 2,521.44$           2,773.59$           
Granby Middle S M Building Wide Electrical, Technology, & Security D50  D5020     D5020-10     D5020-10-01C  Correct Building Wide General Lighting Inefficient by Demolition & Repla      73,406 BLDG SF Useful Life 3 P3      Cap Renewal UnNoUn 1,637,452.96$   1,801,198.26$   
Granby Middle S M Building Exterior Electrical, Technology, & Security D50  D5020     D5020-16    D5020-16-01C  Correct Exterior Building Recessed Lighting Deterioration by Demolition  7 EACH Useful Life 2 P2      Cap Renewal UnNoUn 11,327.09$         12,459.80$        
Granby Middle S M Building Exterior Electrical, Technology, & Security D50  D5020     D5020-16    D5020-16-02C  Correct Exterior Building Wall Mounted Lighting Deterioration by Demo   26 EACH Useful Life 2 P2      Cap Renewal UnNoUn 38,769.71$         42,646.68$        
Granby Middle S M Storage Room Electrical, Technology, & Security D50  D5020     D5020-20   D5020-20-02C  Correct Commercial Dimming System (1K - 5K SF) Deterioration by Demo   3,000 SQFT Useful Life 1 P1      Chair Storage rm next to kit         Cap Renewal UnNoUn 31,844.70$         35,029.17$        
Granby Middle S M 2nd Floor Electrical, Technology, & Security D50  D5021   D5021-01  D5021-01-06C  Correct Receptacles (GFCI) Required by Install New 32 EACH Useful Life 1 P1      Counter top outlets near sin     Cap Renewal UnNoUn 40,102.80$         44,113.08$        
Granby Middle S M Building Wide Electrical, Technology, & Security D50  D5021   D5021-03     D5021-03-03C  Correct Branch Wiring Deterioration by Demolition & Replacement (BLD  73,406 BLDG SF Useful Life 3 P3      Cap Renewal UnNoUn 515,310.12$      566,841.13$      
Granby Middle S M Building Wide Electrical, Technology, & Security D50  D5031  S    D5031-05     D5031-05-01C  Correct Building Wide Security System Deterioration by Demolition & Re   73,406 BLDG SF Useful Life Life Safety 2 P2      Cap Renewal UnNoUn 183,294.78$      201,624.26$      
Granby Middle S M Building Wide Electrical, Technology, & Security D50  D5031  S    D5031-08      D5031-08-01C  Correct Building Wide Video Surveillance System Deterioration by Demo      73,406 BLDG SF Useful Life Life Safety 2 P2      Cap Renewal UnNoUn 318,538.00$      350,391.80$      
Granby Middle S M Building Wide Electrical, Technology, & Security D50  D5032  C    D5032-01    D5032-01-02C  Correct Master Clock System Deterioration by Demolition & Replacemen   73,406 BLDG SF Useful Life 4 P4    Cap Renewal UnNoUn 249,940.09$      274,934.10$      
Granby Middle S M Building Wide Electrical, Technology, & Security D50  D5035  T  D5035-04     D5035-04-01C  Correct Building-Wide Telephone System Deterioration by Demolition &   73,406 BLDG SF Useful Life 4 P4    Cap Renewal UnNoUn 413,165.67$      454,482.24$      
Granby Middle S M Penthouse Electrical, Technology, & Security D50  D5090  O   D5090-04     D5090-04-05C  Correct Uninterruptable Power Supply System (10 KVA) Deterioration by   1 EACH Useful Life Life Safety 1 P1      Exit/ Em Light battery back      Cap Renewal UnNoUn 47,269.66$         51,996.63$        
Granby Middle S M 1st Floor Electrical, Technology, & Security D50  D5090  O   D5090-05   D5090-05-01C  Correct Lighting Timeclock Deterioration by Demolish & Replacement 1 EACH Useful Life 1 P1      Elect Closet Wing A Cap Renewal UnNoUn 2,358.40$           2,594.24$           
Granby Middle S M Building Wide Architectural Interiors & Finishes E20  E2010  F  E2010-01  WE2010-01-01C  Correct Wardrobe Deterioration by Demolition & Replacement 17 EACH Useful Life 2 P2      A Wing First Floor - Rms S7                            Cap Renewal UnNoUn 29,662.15$         32,628.36$        
Granby Middle S M Building Wide Architectural Interiors & Finishes E20  E2010  F  E2010-04  C   E2010-04-01C  Correct Wall Cabinet Deterioration by Demolition & Replacement 156 LNFT Useful Life 2 P2      (40 lf) A Wing - First Floor -                         Cap Renewal UnNoUn 104,960.59$      115,456.65$      
Granby Middle S M Building Wide Architectural Interiors & Finishes E20  E2010  F  E2010-04  C   E2010-04-04C  Correct Base Cabinet with Laminate Counter Deterioration by Demolitio        1,273 LNFT Useful Life 2 P2      (60 lf) A Wing - First Floor -                                            Cap Renewal UnNoUn 1,460,022.80$   1,606,025.07$   
Granby Middle S M Building Wide Architectural Interiors & Finishes E20  E2010  F  E2010-04  C   E2010-04-11C  Correct Laminate Countertop Only Deterioration by Demolition & Replac 65 SQFT Useful Life 2 P2      A wing second floor. Cap Renewal UnNoUn 4,768.63$           5,245.49$           
Granby Middle S M Building Wide Architectural Interiors & Finishes E20  E2010  F  E2010-05     E2010-05-01C  Correct Laboratory Casework Deterioration by Demolition & Replaceme 222 LNFT Useful Life 3 P3      Lower cabinet with epoxy c                    Cap Renewal UnNoUn 546,261.70$      600,887.87$      
Granby Middle S M Building Wide Architectural Interiors & Finishes E20  E2013  F  E2013-03   E2013-03-07C  Correct Indoor Motorized Telescopic Bleacher Deterioration by Demoliti   450 SEAT Useful Life 2 P2      Cap Renewal UnNoUn 381,683.16$      419,851.48$      
Granby Middle S M Parking Lot Site Improvements G20   G2020   G2020-01    G2020-01-02C  Correct Bituminous Parking Lot Deterioration by Patch & Apply Sealcoat 2,778 SQYD Damaged / Ino 2 P2      North parking lot Cap Renewal UnNoUn 3,541,191.61$   3,895,310.77$   
Granby Middle S M Parking Lot Site Improvements G20   G2020   G2020-01    G2020-01-02C  Correct Bituminous Parking Lot Deterioration by Patch & Apply Sealcoat 600 SQYD Damaged / Ino 1 P1      Drive lane @ south elevatio Cap Renewal UnNoUn 764,836.20$      841,319.82$      
Granby Middle S M Parking Lot Site Improvements G20   G2020   G2020-01    G2020-01-02C  Correct Bituminous Parking Lot Deterioration by Patch & Apply Sealcoat 223 SQYD Damaged / Ino 2 P2      Drive lane @ loading dock Cap Renewal UnNoUn 284,264.12$      312,690.53$      
Granby Middle S M Parking Lot Site Improvements G20   G2030   G2030-01   G2030-01-03C  Correct Bituminous Sidewalk Deterioration by Patch & Install Sealcoat 889 SQYD Damaged / Ino 2 P2      Walkway around building p Cap Renewal UnNoUn 11,335.11$         12,468.62$        
Granby Middle S M Building Property Fire Alarm & Protection G30     G3010  W  G3010-03      G3010-03-03C  Correct Site Fire Protection Water Service Piping (6" Pipe) Required by In  365 LNFT Best Practice / Life Safety 2 P2      Item 4 of 4 required to prov                     Cap Imprv UnNoUn 67,374.44$         74,111.88$        
Granby Middle S M Building Property Fire Alarm & Protection H10   H1010   H1010-35   H1010-35-01C  Correct Pump House Required by Add New 180 SQFT Best Practice / Life Safety 2 P2      Item 2 of 4 required to prov   Cap Imprv UnNoUn 20,857.50$         22,943.25$        
Granby Middle S M Kitchen Architectural Interiors & Finishes Z10   Z1040  D    Z1040-01  A    Z1040-01-01C  Correct Investigation Consultant Services Required by Contracting Appro   6 LPSM Useful Life 1 P1      Allowance to replace (2) ex               Cap Renewal UnNoUn 94,500.00$         103,950.00$      

Page 34

2026 Granby MS Facility Condition Assessment 
ASSESSEMENT STANDARDS & DEFINITIONS 
March 31, 2026 
  
1 | P a g e  
 
Project Scope of Work Summary 
The team will evaluate equipment and assess major building and site-related systems for the 
purpose of identifying capital renewal and capital improvement needs.  The scope of work 
includes the identification of stewardship-focused corrective actions that address significant 
repairs, restoration, or replacement over the next 10 years for the following items: 
 
 Building Envelope / Substructure 
 Roofing Systems 
 Exterior Walls, Windows, Doors 
 Interior Construction & Finishes 
 Fixed Furnishings & Casework 
 HVAC Systems & Equipment 
 Electrical Power / Distribution 
 Lighting Systems 
 Information / Communication Tech 
 Plumbing Systems 
 Fire Protection / Life Safety 
 Security Systems  
 Elevators / Lifts / Ramps 
 Hazardous Abatement 
 Exterior Building / Site Lighting 
 Pedestrian Access / Sidewalks 
 Vehicular Access / Parking Lots 
 Genl Mech / Elec / Plumb Utilities 
 
Our inspection is characterized as non-intrusive, non-destructive based on the team members’ 
reasonable access to observe visible building components and equipment. 
 
Building Classification System 
The UNIFORMAT classification system is one of the primary tools for insuring consistency of 
assessment information between buildings and projects.  Listed below is the categorization by 
which “corrective actions” are applied to each facility by building system and sub-system per the 
UNIFORMAT.  
  
 A10 – Foundations 
 A20 – Basement Construction 
 B10 – Superstructure 
 B20 – Exterior Enclosure 
 B30 – Roofing 
 C10 – Interior Construction 
 C20 – Stairs & Ramps 
 C30 – Interior Finishes 
 D10 – Conveying 
 D20 – Plumbing 
 D30 – HVAC  
 D40 – Fire Protection 
 D50 – Electrical  
 E10 – Equipment  
 E20 – Furnishings 
 F10 – Special Construction 
 F20 – Selective Demolition 
 G10 – Site Preparation 
 G20 – Site Improvements  
 G30 – Site Civil Mech Utilities 
 G40 – Site Electrical Utilities 
 G90 – Other Site Construction 
 H10 – Space Requirements 
 Z10 – General Requirements
 
 

Page 35

2026 Granby MS Facility Condition Assessment 
ASSESSEMENT STANDARDS & DEFINITIONS 
March 31, 2026 
  
2 | P a g e  
 
 
Prioritization Classifications 
Recommended corrective actions will be assigned a priority which, in the opinion of the 
assessor, classifies the urgency of the required replacement or repair over a 10-year period.  
Note that corrective actions are applied based on our knowledge of complex building systems, 
industry standards, owner insight, available documentation, and a visual inspection to determine 
the perceived condition of building systems or equipment, not simply installation dates. 
Corrective actions with a Priority 2 – 4 applied are subjective in nature based on the existing 
condition, current environment, standard usage, and maintenance performed by the owner. 
 
 Priority 1  
 Work should be performed immediately. (CY’2027) 
 Priority 2 
Work should be performed within 3 years. (CY’2028 – 2030) 
 Priority 3 
 Work should be performed within 5 years. (CY’2031 – 2032) 
 Priority 4 
Work should be performed within 10 years. (CY’2033-2037) 
 
 
Correction Type Category 
Recommended corrective actions will be assigned a “correction category” criterion which 
identifies the “type” of expenditure required to address the recorded issue.  This rating will 
provide another option to analyze data and assist the decision-making process in the 
development of capital improvement plans. 
 
 Capital Renewal 
o Corrective actions that address maintenance repairs, restoration, or replacement of 
an existing building system or component that have not yet been expended. 
o Work that potentially should have been performed but was delayed due to funding 
issues, changing priorities, access limitations, or the capacity to perform the work. 
 Capital Improvement 
o Corrective actions that address a non-existent or non-compliant building system or 
component for general code compliance or consistent with current technology. 
 
 
 
 
 

Page 36

2026 Granby MS Facility Condition Assessment 
ASSESSEMENT STANDARDS & DEFINITIONS 
March 31, 2026 
  
3 | P a g e  
 
Justifications for Corrective Actions 
Recommended corrective actions will be assigned a “justification” criterion that helps identify the 
“why” or perceived driver of the improvement.  A minimum of (1) one justification is required to 
be assigned with the most serious / significant justification issued first, with the potential 
application of (2) two justifications when appropriate.  Proposed justifications include:  
 
 Best Practice / Standard 
 Damaged / Inoperable 
 Environmental Improvement* 
 Functionality 
 Life Safety** 
 Useful Life 
 
 
*Environmental Improvement is applicable to hazardous materials or select new mechanical. 
**Life Safety initiates a phone call only when reporting a situation of potential imminent danger. 
  
  
Unit of Measures (UOM) 
Each corrective action in the Capital Renewal & Improvement Report have an assigned unit of 
measure.  Listed below are typical and/or potential UOM’s applied in this project: 
 
 ACRE – Acre 
 BLDG SF – Building Square Feet 
 CUFT – Cubic Feet 
 CUYD – Cubic Yards 
 EACH – Each 
 FLR – Floor 
 HGHT – Height (Escalators) 
 LNFT – Linear Feet 
 LPSM – Lump sum 
 RISR – Riser  
 SEAT – Seat  
 SQFT – Square Feet 
 SQYD – Square Yards 
 TONS – Tons
 
 
Campus / Property 
This project will include the following Campus / Property: 
 
 Granby Public Schools 
 
 
Building Types  
For report and analysis purposes, this project will include the following building type: 
 
 Middle School 
 

Page 37

2026 Granby MS Facility Condition Assessment 
ASSESSEMENT STANDARDS & DEFINITIONS 
March 31, 2026 
  
4 | P a g e  
 
Project Team Disciplines 
Assessment data will be collected by the following discipline specialists: 
 
 ARCH Architectural (Interior Construction, Building Envelope, Site) 
 ELEC Electrical / Security / Communications 
 MEPL Mechanical / Plumbing 
 
 
Cost Estimate Development & Approach 
StudioJAED’s CT2000© data collection and reporting tool contains a master database of 
recommended corrective actions and associated unit cost estimates based on a pre-assigned 
unit of measure.  In accordance with our quality assurance practices, each estimate is 
developed by our Certified Professional Estimators utilizing the RSMeans “CostWorks” 
application.  Base trade costs are typically adjusted to incorporate several other construction 
and soft cost factors (i.e., contractor costs, owner contingency, permits, fees, etc.) as per client 
preferences.   
 
Note that estimates are developed from a conservative perspective and are intended to support 
the planning process for capital improvement needs.  The approved cost model defined for this 
project will be applied to each recommended corrective action.  This provides the owner the 
greatest degree of flexibility to implement a single item or a grouping of items based on current 
circumstances.  If the owner chooses to implement multiple projects at the same building and/or 
similar work across multiple buildings, efficiencies are likely that will result in an overall savings. 
 
Provided below is the proposed BASIC cost model approach including preferred construction 
delivery method and allowance percentages.   
 
 
 
 
 
 
 
 
 
 
 
 
 

Page 38

2026 Granby MS Facility Condition Assessment 
ASSESSEMENT STANDARDS & DEFINITIONS 
March 31, 2026 
  
P a g e  5 | 8 
 
 
Base Trade Cost 
RSMeans is the leading source of current construction cost estimating data used in the industry.  
StudioJAED utilizes the RSMeans database to generate a “Base Trade Cost” estimate per 
unique corrective action which includes allowances for materials, labor, transportation, and 
storage by task.  All unit costs are adjusted to the appropriate city cost index to account for 
regional factors.   
 
Estimated Construction “Hard” Cost 
The Construction Cost includes construction delivery overhead, profit, general conditions, 
insurance, bonds, material, and labor to perform the scope of work.  Allowances for ancillary 
trade work required to complete the scope of work are included for a complete project.  Listed 
below are the conditions and/or assumptions used to develop the construction “Hard” cost 
estimates which by definition exclude owner soft costs such as project management, design 
fees, owner contingency, permit fees, etc.: 
 
 Prevailing wage labor rates on straight time. 
 No consideration of factors related to implementation (i.e., occupied, phased, etc.) 
 No escalation 
 
As a reminder, escalation is not included in any cost model as it should be calculated  
/ added to the “Total Cost” based on an anticipated date of construction. 
Base Trade Cost $1,000.00
General Construction Delivery Method Markup 26.00% $260.00
Field General Conditions (10%)
Insurance (2%)
P&P Bond (1.5%)
Permits & Fee Allowance (2.5%)
Overhead & Profit (10%)
Estimated Construction Cost $1,260.00
Soft Cost Allowance
A/E Design thru Construction Administration Fee Allowance 10.0% $126.00
Unforseen Construction Contingency Allowance 10.0% $126.00
Owner Costs 0.0% $0.00
Project Management 5.0% $63.00
Estimated Total Cost $1,575.00
Based on current 2026 RSMeans Trade Cost
(Adjusted based on project location appropriate City Cost Index)

Page 39

2026 Granby MS Facility Condition Assessment 
ASSESSEMENT STANDARDS & DEFINITIONS 
March 31, 2026 
  
P a g e  6 | 8 
 
Soft Cost Allowance 
The cost model approach provides the ability to uniformly adjust the estimated construction cost 
to account for typical owner fees and allowances, as shown, as well as unique cost factors.   
 
Estimated Total Cost 
The Estimated Total Cost is the cumulative cost anticipated to complete each unique corrective 
action based on current regionalized trade costs, typical contractor costs, averaged owner cost 
allowances, and the potential consideration of unique factors that impact the cost of construction. 
 
 
System Cost Analysis & Adjustment 
StudioJAED has conducted several work sessions to evaluate current market conditions, recent 
owner bid results, and other factors that appear to have a long-term impact on typical material, 
equipment, and labor construction costs.  The team mutually determined that the best overall 
approach to forecasting construction costs is to apply a percentage factor by select building 
systems.   
 
Based on recent project data across multiple sources, the recommended percent increase to be 
applied for all corrective actions applied is as follows: 
 
 Foundations (5%) 
 Basement Construction (5%) 
 Superstructure (12%) 
 Exterior Enclosure (5%) 
 Roofing (10%) 
 Plumbing (9%) 
 HVAC (18%) 
 Fire Protection (18%) 
 Electrical (16%) 
 Site Preparation (5%) 
 Site Improvements (5%) 
 
For planning purposes, all estimated assessment costs are expressed within a “range” with a 
proposed low range value (0%) and a high range value (10%).  This provides an adjustment to 
account for project complexity factors, anticipated and/or unforeseen, that may impact the 
implementation and/or execution of improvements.   
 
Provided below is the proposed ENHANCED cost model approach which includes the mutually 
agreed upon system specific adjustments and range factors outlined above as well as a sample 
calculation table. 
 
 
 
 

Page 40

2026 Granby MS Facility Condition Assessment 
ASSESSEMENT STANDARDS & DEFINITIONS 
March 31, 2026 
  
P a g e  7 | 8 
Enhanced Cost Model Approach 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Base Trade Cost $1,000.00
General Construction Delivery Method Markup 26.0% $260.00
Field General Conditions (10%)
Insurance (2%)
P&P Bond (1.5%)
Permits & Fee Allowance (2.5%)
Overhead & Profit (10%)
Estimated Construction Cost $1,260.00
% Factor by Select Building Systems (Example: Roofing) 10.0% $126.00
Foundations 5% HVAC 18%
Basement Construction 5% Fire Protection 18%
Superstructure 12% Electrical 16%
Exterior Enclosure 5% Site Preparation 5%
Roofing 10% Site Improvements 5%
Plumbing 9%
Adjusted System Cost $1,386.00
Soft Cost Allowance
A/E Design thru Construction Administration Fee Allowance 10.0% $138.60
Unforseen Construction Contingency Allowance 10.0% $138.60
Owner Costs 0.0% $0.00
Project Management 5.0% $69.30
Estimated Assessment Cost (Low Range) $1,732.50
Complexity Factor Allowance, Anticipated or Unforseen 10.0% $173.25
Estimated Assessment Cost (High Range) $1,905.75
Based on current 2026 RS Means Trade Cost
(Adjusted based on project location appropriate City Cost Index)

Page 41

2026 Granby MS Facility Condition Assessment 
ASSESSEMENT STANDARDS & DEFINITIONS 
March 31, 2026 
  
P a g e  8 | 8 
Construction Cost Analysis & Adjustments by Building System 
Sample Calculation Table 
 
25% 0% 10%
System Name Estimated Const Cost System % Factor Adjusted System Cost Adjusted System w/ Soft Cost Estimated Assmt Cost Low Range Estimated Assmt Cost High Range
A10  Foundations 1,260.00$   5% 1,323.00$   1,653.75$   1,653.75$   1,819.13$   
A20  Basement Construction 1,260.00$   5% 1,323.00$   1,653.75$   1,653.75$   1,819.13$   
B10  Superstructure 1,260.00$   12% 1,411.20$   1,764.00$   1,764.00$   1,940.40$   
B20  Exterior Enclosure 1,260.00$   5% 1,323.00$   1,653.75$   1,653.75$   1,819.13$   
B30  Roofing 1,260.00$   10% 1,386.00$   1,732.50$   1,732.50$   1,905.75$   
C10  Interior Construction 1,260.00$   0% 1,260.00$   1,575.00$   1,575.00$   1,732.50$   
C20  Stairs & Ramps 1,260.00$   0% 1,260.00$   1,575.00$   1,575.00$   1,732.50$   
C30  Interior Finishes 1,260.00$   0% 1,260.00$   1,575.00$   1,575.00$   1,732.50$   
D10  Conveying 1,260.00$   0% 1,260.00$   1,575.00$   1,575.00$   1,732.50$   
D20  Plumbing 1,260.00$   9% 1,373.40$   1,716.75$   1,716.75$   1,888.43$   
D30  HVAC 1,260.00$   18% 1,486.80$   1,858.50$   1,858.50$   2,044.35$   
D40  Fire Protection 1,260.00$   18% 1,486.80$   1,858.50$   1,858.50$   2,044.35$   
D50  Electrical 1,260.00$   16% 1,461.60$   1,827.00$   1,827.00$   2,009.70$   
E10  Equipment 1,260.00$   0% 1,260.00$   1,575.00$   1,575.00$   1,732.50$   
E20  Furnishings 1,260.00$   0% 1,260.00$   1,575.00$   1,575.00$   1,732.50$   
F10  Special Construction 1,260.00$   0% 1,260.00$   1,575.00$   1,575.00$   1,732.50$   
F20  Selective Demolition 1,260.00$   0% 1,260.00$   1,575.00$   1,575.00$   1,732.50$   
G10  Site Preparation 1,260.00$   5% 1,323.00$   1,653.75$   1,653.75$   1,819.13$   
G20  Site Improvements 1,260.00$   5% 1,323.00$   1,653.75$   1,653.75$   1,819.13$   
G30  Site Civil Mech Utilities 1,260.00$   0% 1,260.00$   1,575.00$   1,575.00$   1,732.50$   
G40  Site Electrical Utilities 1,260.00$   0% 1,260.00$   1,575.00$   1,575.00$   1,732.50$   
G90  Other Site Construction 1,260.00$   0% 1,260.00$   1,575.00$   1,575.00$   1,732.50$   
H10  Space Requirements 1,260.00$   0% 1,260.00$   1,575.00$   1,575.00$   1,732.50$   
Z10  General Requirements 1,260.00$   0% 1,260.00$   1,575.00$   1,575.00$   1,732.50$   

Page 42

 
Granby, Connecticut 
 
 
 
 
 
 
 
 
 
 
 
  
BOARD OF EDUCATION 
  Monica Logan, Chair  
Heather Lombardo, Vice Chair 
Liz Barlow, Secretary 
Andrew Billig 
Donna Nolan  
David Peling, Ed.D. 
Ann Woods 
 
ADMINISTRATION 
Cheri P. Burke, Superintendent of Schools 
Jennifer M. Parsons, Assistant Superintendent 
Jennifer Brown, Director of Human Resources 
Kathryn Weingartner, Director of Pupil Services 
Nicole Stevenson, Director of Finance & Operations 
Christopher DeGray, Director of Facilities 
Heather Tanis, Principal, Granby Memorial Middle School  
EDUCATIONAL SPECIFICATIONS 
for 
Granby Memorial Middle School 
DRAFT – April 2026 
 
Approved by the Granby Board of Education on _________ 
 

Page 43

TABLE OF CONTENTS 
 
 I.  INTRODUCTION ......................................................................................3 
 II. GRANBY CORE DOCUMENTS ..............................................................3 
 III. PROJECT RATIONALE ............................................................................4 
 IV. THE PROJECT ...........................................................................................4 
 V. ENROLLMENT AND CAPACITY DATA ...............................................4 
 VI. OVERVIEW OF PROGRAMS ..................................................................4 
 VII. PROGRAM SPECIFICATIONS (Detailed Description) ...........................7 
  On-Team Programs ............................................................................................................7 
  Unified Arts Programs........................................................................................................11 
  Elective Programs...............................................................................................................15 
  General Education Support Programs ................................................................................18 
  Special Education Programs ...............................................................................................20 
  Administration & Support Programs ..................................................................................24 
 VIII. COMMUNITY USE ...................................................................................30 
 IX. ENVIRONMENT - SYSTEMS - EQUIPMENT .......................................30 
 X. SITE DEVELOPMENT..............................................................................34 
  SPACE SUMMARY ..................................................................................35 
 
 
 
 
 
 
  

Page 44

April 2026 
Granby Memorial Middle School, Granby, CT  Page 3 
I.  INTRODUCTION 
The Granby Public Schools is committed to consistently maintaining our facilities and planning for the future of our 
buildings as 21st century learning environments. 
To initiate planning for a “renovated as new” Granby Memorial Middle School, Granby Board of Education engaged 
the services of Colliers Project Leaders and Daniel Hansen, educational consultant, to assist with the development of 
Educational Specifications. The following individuals participated in the initial program meetings to provide input for 
these educational specifications: 
 
Elizabeth Asal, School Psychologist 
Jeannie Bryanton, Teacher - Art 
Tim Cunningham, Director of School Counseling 
Yuri Dominguez, Technology Support Specialist 
Laila Falkenberg, Teacher – Math Intervention 
Jess Foskitt, Teacher - Music 
Dean Godin, Teacher – Physical Education/Wellness 
James Janski, Teacher – Technology Education 
John Lambert, Director of Technology 
Frank Melanson, Technology Operations Manager 
Caryn Neff, School Counselor 
Jodi Okenquist, Teacher – Social Studies 
Jennifer Parsons, Assistant Superintendent 
Megan Rheiner, School Counselor  
Ruth Rivera, Teacher – Music 
Leigh Ann Ryan, Library Media Specialist 
Alex Schwartz, Assistant Principal 
Tracy Smith, Department Chair – Special Education 
Heather Tanis, Principal 
Michelle Tardif, Teacher – Literacy Specialist 
Kate Wardle, Teacher – Family & Consumer Science 
Kate Weingartner, Director of Pupil Services 
Peter Wik, Teacher – Science  
 
 
 
II. GRANBY CORE DOCUMENTS 
GRANBY PUBLIC SCHOOLS 
 
Vision of a Graduate 
Resourceful Learners 
• Ask questions and identify problems or challenges 
• Identify strategies and methods for personal success 
• Explore and connect areas of interest 
• Set goals and persist in achieving these goals 
• Gather and evaluate a variety of sources and perspectives 
• Synthesize information and create solutions 
• Solve complex problems by applying approaches from multiple disciplines  
 
Effective Communicators 
• Listen closely and respectfully participate in discourse 
• Value diverse voices and viewpoints 
• Prepare a message for an identified purpose and audience 
• Express ideas clearly in a variety of ways 
• Support arguments with evidence  
• Adapt and adjust thinking based on feedback and new learning 
• Use tools and technology flexibly and strategically 
 
Positive Contributors 
• Develop meaningful connections with others 
• Collaborate for a common goal 
• Exhibit compassion and empathy 
• Make healthy and responsible decisions 
• Use personal talents and knowledge to contribute to society 
• Demonstrate civic responsibility 
• Understand that actions have impact on the local community, the country and our global society 
 
Adopted by the Granby Board of Education September 1, 2021 

Page 45

April 2026 
Granby Memorial Middle School, Granby, CT Page 4 
III. PROJECT RATIONALE 
This section needs to be completed once the project moves forward. This section should capture the districts long-
range facility goals; feasibility studies completed; projects already completed, etc. 
This project seeks to provide a school building that: 
• Creates learning environments designed for current instructional strategies as captured in Granby’s Core 
Documents; 
• Benefits from needed technology upgrades; 
• Complies with current building and fire codes; 
• Incorporates contemporary design for school safety; 
• Utilizes modern, efficient heating and cooling systems; and 
• Provides accessibility to all by meeting the requirements of the Americans  
with Disabilities Act. 
    IV. THE PROJECT 
Objective: To ensure all Granby children are able to attend a school that is safe, modern, compliant with current 
building codes and able to support their educational program. 
The following project specifications for the “renovated as new” Granby Memorial Middle School were developed 
using data from the updated population study conducted in January 2025. Granby Public Schools 10-Year Enrollment 
Projections Update, MP Planning Group, December 2025. 
• School: Granby Memorial Middle School (6-8) 
• Project Type: Renovate as New 
o Total Program Area: 58,825 square feet for Grade 6-8 programs 
• Design Enrollment: 401 students (8-year max projection) 
V. ENROLLMENT AND CAPACITY DATA 
The Granby Memorial Middle School enrollment as of October 1, 2025 was 398 students in grades 6-8. The eight-
year maximum enrollment projection for the middle school is 401.  
Source: Granby Public Schools 10-Year Enrollment Projections, December 2025, MP Planning Group 
VI. OVERVIEW OF PROGRAMS 
MIDDLE SCHOOL COURSE OF STUDIES 
Sixth Grade  
On Team Courses  Unified Arts Courses  Electives  
English Language Arts (Full 
Year) 
 
Mathematics 6/Accelerated   
(Full Year) 
 
Visual Arts 6 (Quarterly) 
 
Explorations in Technology (Quarterly) 
 
Family Consumer Sciences (FCS):    Eat Smart, 
Live Smart (Quarterly) 
 
Band (Full Year) 
 
Chorus (Full 
Year) 
 
Orchestra (Full 
Year) 

Page 46

April 2026 
Granby Memorial Middle School, Granby, CT Page 5 
Integrated Science 6 (Full 
Year) 
  
Global Studies 6 (Full Year) 
 
World Language (Every Other 
Day) 
• French 6  
• Spanish 6 
 
GMMS SUCCESS (Every 
Other Day) 
 
Study Skills (Full Year)  
Digital Media (Quarterly) 
 
Music Appreciation (Full Year) 
 
Wellness 6  (Full Year) 
 
  
 
Seventh Grade  
On Team Courses  Unified Arts Courses  Electives  
English Language Arts (Full Year)  
 
Mathematics (Full Year) 
• Math 7  
• Advanced Math  
 
Integrated Science 7 (Full Year) 
 
Global Studies 7 (Full Year) 
 
World Language (Full Year) 
• French I   
• Spanish I 
 
Study Skills (Full Year)  
Visual Arts 7(Quarterly) 
 
Production Systems &  
     Enterprise (Quarterly) 
 
FCS - Building Your Life  Skills (Quarterly) 
 
Innovative Technologies (Quarterly) 
 
Music Appreciation 7 (Full Year) 
 
Wellness 7 (Full Year) 
Band (Full Year) 
 
Chorus (Full Year) 
 
Orchestra (Full Year) 
 
  
 
Eighth Grade  
On Team Courses  Unified Arts Courses  Electives  
English Language Arts (Full Year) 
 
Mathematics (Full Year) 
• Pre-Algebra 
• Algebra 
 
Integrated Science 8 (Full Year) 
 
US History 8 (Full Year) 
 
World Language (Full Year) 
• French II  
• Spanish II 
• Mandarin Chinese II 
Visual Arts 8 (Quarterly) 
 
Engineering and Research &     
Development  (Quarterly) 
 
FCS - Planning Your Future (Quarterly) 
 
Computer Science (Quarterly) 
 
Music Appreciation 8 (Full Year) 
 
Wellness 8 (Full Year)  
Band (Full Year) 
 
Chorus (Full Year) 
 
  

Page 47

April 2026 
Granby Memorial Middle School, Granby, CT Page 6 
 
Study Skills (Full Year) 
The classroom needs of all Middle School children will require flexibility of space, portability of furniture and 
acoustical treatment of environment. Consistent with Granby’s Educational Goals, these collaborative learning 
environments will allow for students to become Resourceful Learners, Effective Communicators, and Positive 
Contributors. This will be accommodated by providing space for group instruction and movement that will range from 
total class involvement to three or four separate groups doing different activities at the same time. Space should also 
be provided for students to read, write, research, and study for either individual or small group projects. The learning 
environment must also accommodate space for multiple adults (specialists and paraeducators) who work with students 
within the general classroom environment. All instructional classrooms require storage space for items such as 
classroom libraries, textbooks, reference materials, supplemental books, supplies and manipulatives, science 
equipment, and computers. Equally important is wall space (vertical space/white boards) for collaborative groups to 
show their work and for posting anchor charts and other instructional reference materials for students to access on a 
daily basis. Furthermore, the teaming structure at the Middle School consists of four interdisciplinary teams. 
A platform within the cafeteria or gymnasium will serve as a stage area for school assemblies, performances and other 
events and will be accessible from the main corridor. The platform will be code compliant with ramp access. Included 
in the design will be a high-quality built-in sound system, stage draperies and main curtains, as well as adjustable 
stage and general lighting.  
Additional instructional space is necessary to provide support for general education students, as prescribed in the 
Scientific Researched Based Intervention (SRBI) requirements of the Connecticut State Department of Education. 
General Education Intervention/Support Services is comprised of Reading and Mathematics intervention and Multi-
Language Learner (MLL) support. Each of these rooms will be located within the academic area of the building. These 
rooms will be utilized for individual and small group instruction. Significant space is also required for the Guidance 
Department including office space, instructional space and file storage. 
The Middle School students will have access to a multi-purpose field with artificial turf, a track and a baseball field. 
The athletic fields and playground areas shall include: controlled perimeter fencing; lockable gates for supervised 
access; and the fence design shall maintain visibility while supporting security. 
SPECIAL EDUCATION  
Granby Public Schools invests significantly in its special education programming to provide inclusive, high quality 
learning opportunities and ensure students are served within their school community whenever possible. Special 
Education programs at Granby Memorial Middle School include: Special Education Resource program; the Life Skills 
program; Occupational/Physical Therapy (OT/PT) Services; and Related Services (Psychologist, 
Speech/Language/Hearing, Social Worker). 
Program spaces for special education/related service teachers should be able to meet the needs for small group 
instruction.  They will need to be of sufficient size to accommodate children who require specialized equipment.  
Rooms will be used for individual and small group instruction, individual testing, confidential meetings with parents 
and/or students, counseling, and staff conferences.    
SUPPORT SERVICES  
MEDIA CENTER 
The Library Media Center of the Middle school is a multi-purpose room preferably located as a central “hub” of the 
school.  These spaces should be bright, colorful, attractive, warm and inviting. It is important that the media center be 
designed with the student’s safety and access in mind.  There should be freestanding low, double-faced shelving 
allowing a staff member to see the entire area.  The area must be spacious enough to house an appropriate print and 
media collection. The media center should include a mix of large group instructional space, small group collaboration 
areas, independent work zones, and flexible project-based learning areas. Furniture should be mobile and easily 
reconfigurable to support whole-class instruction, team teaching, small-group collaboration, and individual learning. 
The space should support research, media creation, design thinking, and student presentation. Dedicated areas may 
include a project or maker space, informal seating for collaboration, and spaces for inquiry-based learning, and 
interdisciplinary work. 
 

Page 48

April 2026 
Granby Memorial Middle School, Granby, CT Page 7 
TECHNOLOGY  
A contemporary Middle school must be able to support varied uses of technology.  In particular, the school’s 
infrastructure should reflect the latest in wiring and cabling, which would support current technology applications as 
well as the capacity to support future requirements. Computers should support the full range of educational and 
operational functions in the school.   
Wiring for all classrooms will include multiple network drops and multiple electrical outlets. The entire facility will 
have wireless connectivity to support the implementation of one-to-one mobile devices such as laptops, netbooks, and 
other Internet-ready devices.  
VII. MIDDLE SCHOOL PROGRAM SPECIFICATIONS (Detailed Description) 
Unless otherwise noted, the standard furnishings for every classroom noted below are expected to include the 
following: 
• Room darkening shades 
• Privacy film or internal window coverings for classroom door vision panels 
• Acoustical insulation for soundproofing 
• Air conditioning 
• ADA compliant building standards 
• Wireless/internet access to support at least 30 mobile devices 
• Multiple electrical outlets and distributed charging access 
• Sound Field System 
• Telephone 
• Intercom for communication with office 
GENERAL EDUCATION PROGRAMS 
 
ON-TEAM PROGRAMS 
 
ACADEMIC CORE CLASSROOM - ELA 
SPACE: 900 square feet  
NUMBER: Four (4) classrooms  
Sinks • Stainless steel sink with solid surface counter 
• In-room water bottle filling station 
• Soap and towel dispenser 
Classroom Storage • Built-in bookcases 
• Storage areas for anchor charts, large bins/kits 
• Classroom library storage 
• Counters under windows where appropriate 
Teacher Storage • Lockable teacher storage wardrobe for three (3) adults 
• One (1) lockable four-drawer filing cabinet  
Student Storage • Individual coat and personal storage for up to twenty-five students per 
classroom in lockers in hallway 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP TILE and area rugs 
Display • Magnetic whiteboards in addition to interactive projective system 
• Bulletin Boards 

Page 49

April 2026 
Granby Memorial Middle School, Granby, CT Page 8 
ACADEMIC CORE CLASSROOM - ELA 
Student Furniture • Flexible tables/desks/standing desks and appropriate student seating for twenty-
five (25) 
• Kidney shaped or U-shaped small group instruction table with chairs 
• Student chairs/stools along countertops for task work 
Teacher Furniture • Teacher desk/chair 
Other Furniture • Corner with soft seating 
Special Requests  • Common small group space outside classroom desirable 
Classroom Technology • Classroom technology per Granby District Standards 
Computers  • Teacher technology per Granby District Standards 
 
ACADEMIC CORE CLASSROOM - MATH 
SPACE: 900 square feet  
NUMBER: Four (4) classrooms  
Sinks • Stainless steel sink with solid surface counter 
• In-room water bottle filling station 
• Soap and towel dispenser 
Classroom Storage • Built-in bookcases 
• Storage areas for anchor charts, large bins/kits 
• Counters under windows where appropriate 
Teacher Storage • Lockable teacher storage wardrobe for three (3) adults 
• One (1) lockable four-drawer filing cabinet  
Student Storage • Individual coat and personal storage for up to twenty-five  students per 
classroom in lockers in hallway 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP TILE and area rugs 
Display • Multiple magnetic whiteboards in addition to interactive projective system 
• Bulletin Boards 
Student Furniture • Flexible tables/desks/standing desks and appropriate student seating for twenty-
five (25) 
• Kidney shaped or U-shaped small group instruction table with chairs 
• Student chairs/stools along countertops for task work 
Teacher Furniture • Teacher desk/chair 
Other Furniture • Corner  with soft seating 
Special Requests  • Common small group space outside classroom desirable 
Classroom Technology • Classroom technology per Granby District Standards 
Computers  • Teacher technology per Granby District Standards 
 
ACADEMIC CORE CLASSROOM – INTEGRATED SCIENCE 
SPACE: 900 square feet  
NUMBER: Four (4) classrooms  
Sinks • Two (2) large/deep stainless-steel sinks with high spigots 
• In-room water bottle filling station 
• Soap and towel dispenser 
Classroom Storage • Built-in bookcases 
• Storage areas for anchor charts, large bins/kits 
• Classroom library storage 
• Work counters under windows and around room where possible 

Page 50

April 2026 
Granby Memorial Middle School, Granby, CT Page 9 
ACADEMIC CORE CLASSROOM – INTEGRATED SCIENCE 
Teacher Storage • Lockable teacher storage wardrobe for three (3) adults 
• One (1) lockable four-drawer filing cabinet  
• Locked chemical closet 
Student Storage • Individual coat and personal storage for up to twenty-five  students per 
classroom in lockers in hallway 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP TILE and area rugs 
Display • Magnetic whiteboards in addition to interactive projective system 
• Bulletin Boards 
Student Furniture • Lab tables and appropriate student seating for twenty-five (25) 
• Demonstration table with overhead projection 
• Student chairs/stools along countertops for task work 
Teacher Furniture • Teacher desk/chair 
Other Furniture •  Corner with soft seating 
Special Requests  • Greenhouse window for plants 
Classroom Technology • Classroom technology per Granby District Standards 
Computers  • Teacher technology per Granby District Standards 
 
ACADEMIC CORE CLASSROOM – GLOBAL STUDIES/U.S. HISTORY 
SPACE: 900 square feet  
NUMBER: Four (4) classrooms  
Sinks • Stainless steel sink with solid surface counter 
• In-room water bottle filling station 
• Soap and towel dispenser 
Classroom Storage • Built-in bookcases 
• Storage areas for anchor charts, large bins/kits 
• Classroom library storage 
• Counters under windows where appropriate 
Teacher Storage • Lockable teacher storage wardrobe for three (3) adults 
• One (1) lockable four-drawer filing cabinet  
Student Storage • Individual coat and personal storage for up to twenty-five  students per 
classroom in lockers in hallway 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP TILE and area rugs 
Display • Magnetic whiteboards accessible for student use 
• Bulletin Boards 
Student Furniture • Flexible tables/desks/standing desks and appropriate student seating for twenty-
five (25) 
• Kidney shaped or U-shaped small group instruction table with chairs 
• Student chairs/stools along countertops for task work 
Teacher Furniture • Teacher desk/chair 
Other Furniture •  Corner with soft seating 
Special Requests  • Common small group space outside classroom desirable 
Classroom Technology • Classroom technology per Granby District Standards 
Computers  • Teacher technology per Granby District Standards 
 

Page 51

April 2026 
Granby Memorial Middle School, Granby, CT Page 10 
ACADEMIC CORE CLASSROOM – WORLD LANGUAGES 
SPACE: 900 square feet  
NUMBER: Three (3) classrooms  
Sinks • Stainless steel sink with solid surface counter 
• In-room water bottle filling station 
• Soap and towel dispenser 
Classroom Storage • Built-in bookcases 
• Storage areas for anchor charts, large bins/kits 
• Classroom library storage 
• Counters under windows where appropriate 
Teacher Storage • Lockable teacher storage wardrobe for one (1) adult 
• One (1) lockable four-drawer filing cabinet  
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP TILE and area rugs 
Display • Magnetic whiteboards in addition to interactive projective system 
• Multiple Bulletin Boards 
Student Furniture • Flexible tables/desks/standing desks and appropriate student seating for twenty-
five (25) 
• Kidney shaped or U-shaped small group instruction table with chairs 
• Student chairs/stools along countertops for task work 
Teacher Furniture • Teacher desk/chair 
Other Furniture • Corner with soft seating 
Classroom Technology • Classroom technology per Granby District Standards 
Computers  • Teacher technology per Granby District Standards 
 
SUCCESS PROGRAM CLASSROOM (GRADE 6) 
SPACE: 900 square feet 
NUMBER: One (1) classroom  
Sinks • Stainless steel sink with solid surface counter 
• In-room water bottle filling station 
• Soap and towel dispenser 
Classroom Storage • Built-in bookcases 
• Storage areas for anchor charts, large bins/kits 
• Classroom library storage 
• Counters under windows where appropriate 
Teacher Storage • Lockable teacher storage wardrobe for one (1) adult 
• One (1) lockable four-drawer filing cabinet  
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP TILE and area rugs 
Display • Magnetic whiteboards in addition to interactive projective system 
• Multiple Bulletin Boards 
Student Furniture • Flexible tables/desks/standing desks and appropriate student seating for twenty-
five (25) 
• Kidney shaped or U-shaped small group instruction table with chairs 
• Student chairs/stools along countertops for task work 
Teacher Furniture • Teacher desk/chair 
Other Furniture •  Corner with soft seating 
Classroom Technology • Classroom technology per Granby District Standards 
Computers  • Teacher technology per Granby District Standards 
 

Page 52

April 2026 
Granby Memorial Middle School, Granby, CT Page 11 
UNIFIED ARTS PROGRAMS 
 
VISUAL ARTS CLASSROOM 
SPACE: 1,100 square feet for classroom 
                             350 square feet for Kiln Room and Storage 
NUMBER:          One (1) classroom 
Sinks 
 
• Minimum two (2) deep sinks with clay traps in addition to one (1) student 
accessible sink all in same location 
• Paint-resistant countertops 
Classroom Storage • Lockable closets 
• Easily accessible cabinets and shelves 
• Vertical file tub-storage cabinets with locks 
• Two (2) kitchen-type mobile carts with shelves 
• Draftsman cabinet file for large paper/poster storage 
Teacher Storage • Lockable teacher storage wardrobe 
• One (1) lockable four-drawer filing cabinet  
Student Storage • Space to store student work in progress; one area per classroom  
Lighting • North facing classroom, preferable 
Flooring • VCT/VCP tile 
Display • Locked showcase on room’s corridor wall (and others throughout building) 
• Magnetic whiteboard 
• Bulletin Board 
Student Furniture • Twenty-five (25) adjustable chairs/stools  
• Six (6) adjustable worktables (rectangular) to seat four (4) 
Teacher Furniture • Teacher desk/chair 
• Demonstration table 
Special Needs/Equipment • One (1) kiln (to be appropriately located and sized) with ventilation system 
• Drying racks 
• Book racks and magazine shelves (fine arts area) 
• Four (4) sturdy wooden adjustable painting easels 
• Two (2) large rolling waste barrels 
• Eyewash station 
• Paper cutter 
Classroom Technology • Classroom technology per Granby District Standards 
Computers • Teacher technology per Granby District Standards 
 
FAMILY CONSUMER SCIENCE CLASSROOM 
SPACE: 1,600 square feet  
NUMBER:          One (1) classroom 
Home Kitchen Stations (6) 
 
• Electric stove/oven 
• Double sink 
• Microwave 
• Heat-proof countertops 
• Kitchen cabinetry; keep view of area open for supervision/observation 
• At least one station ADA compliant 
• OSHA standards 
• Ventilation  

Page 53

April 2026 
Granby Memorial Middle School, Granby, CT Page 12 
FAMILY CONSUMER SCIENCE CLASSROOM 
Home Kitchen Area (to be 
shared among stations) 
• One (1) large refrigerator 
• One (1) large freezer 
• Two (2) dishwashers 
• One (1) washer/dryer 
• Dry storage cabinet 
Community Storage 
Pantry 
• Open wire racks 
Classroom Area • Six (6) high-top tables (counter-top height) 
• Appropriate seating for 25 
• Demonstration table with projection 
• Access to outdoor kitchen garden 
Teacher Storage • Lockable teacher storage wardrobe 
• One (1) lockable four-drawer filing cabinet  
Classroom Storage • Large built-in storage cabinet (closed storage for student materials) 
Lighting • Soft, dimmable lighting 
Flooring • VCT/VCP tile 
Display • Magnetic whiteboards 
• Bulletin Boards 
Teacher Furniture • Teacher desk/chair 
Classroom Technology • Classroom technology per Granby District Standards 
Computers • Teacher technology per Granby District Standards 
 
MUSIC APPRECIATION CLASSROOM 
SPACE: 1,000 square feet  
NUMBER: One (1) classroom 
Sinks • Small sink/fountain area in General Music room  
Classroom Storage • Music cabinets for sheet music storage 
• Built-in bookcase  
• Storage for Orff (or the like) instruments for general music classroom 
Teacher Storage • Lockable teacher storage wardrobe 
• One (1) lockable four-drawer filing cabinet 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile 
Display • Two 8 ft. whiteboards, one with permanent musical staff lines 
Student Furniture • Twenty-five (25) stackable stools in general music room  
Teacher Furniture • Teacher desk/chair 
Other Furniture • Piano in general music room 
Special Accommodations • General music room needs open space for movement and varied activities 
• Sound deadening/soundproof walls 
Classroom Technology • Sound system 
• Classroom technology per Granby District Standards 
Computers  • Teacher technology per Granby District Standards 
• Computer with access to high quality sound system control 
 
MUSIC PROGRAM STORAGE 
SPACE: 250 square feet 
NUMBER: One (1) room 
Access • In proximity to general music classroom  

Page 54

April 2026 
Granby Memorial Middle School, Granby, CT Page 13 
MUSIC PROGRAM STORAGE 
Storage • Built-in lockable storage for instruments (keyboards, guitars, drums, etc.) 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile 
 
PHYSICAL EDUCATION 
SPACE: Gymnasium:  6,660 square feet   
 PE Office:  300 square feet (Two offices @ 150 s.f.) 
                     PE Storage:              600 square feet 
                     Chair Storage:          200 square feet 
Toilets • Toilets within close proximity to gymnasium for student use 
Water Fountain • Recessed drinking fountains/ bottle fill stations located outside the gymnasium 
Access • Access to outdoor fields 
Storage • Storage area will have access from both the interior of the gymnasium, as well 
as the exterior of the building (for outdoor sports and instructional activities); a 
roll-up exterior access door is desired 
• Six (6) shelving units (48”x18”x72”) inside storage facility 
• Folding seating/carts/storage for entire student body, staff and faculty (separate 
storage from PE equipment) 
Lighting • Lighting with safety cages or equivalent 
Flooring • Wooden floor system with essential markings 
• Protective matting 
Special Accommodations • Sound deadening/soundproof walls 
• Retractable bleacher seating on one side of the gymnasium 
• Clerestory windows with remote room darkening shade system 
• High ceiling, the lowest features should be a minimum of 22 ft. from the floor 
• Wall matting around entire perimeter, from height of wall base to 6’-0” 
minimum above finish floor 
• Two (2) main and four (4) side baskets for basketball (all adjustable for height 
and electrically operated) 
• Volleyball post recessed floor sleeves 
• Chinning bars 
• Horizontal bar 
• Divider curtain 
• Ceiling mounts for cargo nets and rope climbing 
• One wall to be designated for future climbing, wall mounted equipment, and the 
masonry cores filled with concrete 
• Movable cart for storage/equipment 
• Two (2) AED with audible alarm box will be installed; one (1) in the public 
access hallway outside nurse’s office, and one (1) outside the gymnasium 
Classroom Technology • One (1) teacher computer 
• Portable Interactive Board system, or similar device for classroom instruction 
• Built-in sound system for assemblies and programs 
 
WELLNESS EDUCATION CLASSROOM 
SPACE: 900 square feet 
NUMBER: One (1) classroom  
Toilet • Toilet facilities located in close proximity to classroom 

Page 55

April 2026 
Granby Memorial Middle School, Granby, CT Page 14 
WELLNESS EDUCATION CLASSROOM 
Sinks • Stainless steel sink with laminate countertops  
• Soap and towel dispenser 
Classroom Storage • Built-in bookcases 
• Storage areas for anchor charts, large bins/kits 
• Classroom library storage 
• Counters under windows where possible 
Teacher Storage • Lockable teacher storage wardrobe for 1 adult 
• One (1) lockable four-drawer filing cabinet  
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile 
Display • Magnetic whiteboards 
• Bulletin Boards 
Student Furniture • Two (2) tables 
• Flexible seating/tables to accommodate up to twenty-five (25) students 
Teacher Furniture • One (1) Teacher desk/chair 
Classroom Technology • Classroom technology per Granby District Standards 
Computers  • Teacher technology per Granby District Standards 
 
TECHNOLOGY LAB - WOODWORKING 
SPACE: 1,200 square feet  
NUMBER:          One (1) classroom 
Sinks 
 
• Utility sink 
• Sink/handwashing station 
• Eye and body wash 
Classroom Storage • Secured tool storage and materials storage 
• Lumber storage 
• Personal protective equipment storage 
• One wall with upper closed storage and open storage under counter 
Teacher Storage • Lockable teacher storage wardrobe 
• One (1) lockable four-drawer filing cabinet  
Student Storage • Space to store student work in progress; one area per classroom  
Lighting • Soft color, dimmable lighting 
Flooring • Flooring material to allow for ease of cleaning and durability 
Display • Multiple magnetic whiteboards 
• Bulletin boards 
Student Furniture • Twenty-five (25) adjustable stools  
• Seven (7) adjustable worktables (counter-top height) to seat four (4) 
Teacher Furniture • Teacher desk/chair 
Special Needs/Equipment • Permanent placement of equipment such as table saw, band saw, jointer, radial 
arm saw, sanders, and drill press with required clearances for safe operation 
• Dust collection 
• Compressed air with hose reels distributed throughout 
• Fire extinguisher/fire blanket 
• Emergency shut offs 
• Overhead door 
• All safety requirements per OSHA standards 
Classroom Technology • Classroom technology per Granby District Standards 
Computers • Teacher technology per Granby District Standards 
 

Page 56

April 2026 
Granby Memorial Middle School, Granby, CT Page 15 
TECHNOLOGY LAB - CAD 
SPACE:  1,000 square feet (each) 
NUMBER: One (1) room 
Access • Adjacent to Woodworking Lab with windows between the two labs and 
connecting door 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile 
Display • Whiteboards 
• Bulletin Boards 
Student Furniture • Computer furniture/workstations and seating for twenty-five (25) students 
Teacher Furniture • Teacher Desk/Chair 
Classroom Technology • Classroom technology per Granby District Standards 
• 3-D printer 
Teacher Technology  • Teacher technology per Granby District Standards 
 
ELECTIVE PROGRAMS 
 
BAND CLASSROOM 
SPACE: 1,500 square feet 
NUMBER: One (1) classroom  
Sinks • Small sink/water bottle refill area 
• Large sink in Instrumental Music Room to submerge brass instruments for 
cleaning (3’ wide by 8’ deep) 
Access • In proximity to platform/stage 
• Music rooms adjacent to each other 
• Instrumental room ideally located near bus entrance for easy drop off/pick up of 
instruments 
Lighting • Soft color, dimmable lighting 
Flooring • LVT/VCP tile 
Display • Two 8 ft. whiteboards, one with permanent musical staff lines  
Student Furniture • Eighty (80) posture/stackable chairs 
• Eighty (80) music stands 
• Instrumental lessons and large group ensembles require 48” of space per 
student 
Other Furniture • One (1) conductor stand 
• Large Move and Store cart for music stands 
• Electronic keyboard  
Special Accommodations • Acoustical treatment for each room 
Classroom Technology • Sound system 
• Classroom technology per Granby District Standards 
Computers  • Teacher technology per Granby District Standards 
• Computer with access to high quality sound system control 
 
CHORUS CLASSROOM 
SPACE: 1,500 square feet 
NUMBER: One (1) classroom  

Page 57

April 2026 
Granby Memorial Middle School, Granby, CT Page 16 
CHORUS CLASSROOM 
Sinks • Small sink/water bottle refill area 
Access • In proximity to platform/stage 
• Music rooms adjacent to each other 
Lighting • Soft color, dimmable lighting 
Flooring • LVT/VCP tile 
Display • Two 8 ft. whiteboards, one with permanent musical staff lines  
Student Furniture • Eighty (80) posture/stackable chairs 
Other Furniture • One (1) conductor stand 
• Performance risers for concerts (to be used on stage) 
• Electronic keyboard  
Special Accommodations • Acoustical treatment for each room 
• ADA compliant raised floor levels to simulate risers in choral room 
• Storage for performance risers 
Classroom Technology • High-quality sound system 
• Classroom technology per Granby District Standards 
Computers  • Teacher technology per Granby District Standards 
• Computer with access to high quality sound system control 
 
ORCHESTRA CLASSROOM 
SPACE: 1,200 square feet 
NUMBER: One (1) classroom  
Sinks • Small sink/water bottle refill area 
Access • In proximity to platform/stage 
• Music rooms adjacent to each other 
• Instrumental room ideally located near bus entrance for easy drop off/pick up of 
instruments 
Lighting • Soft color, dimmable lighting 
Flooring • LVT/VCP tile 
Display • Two 8 ft. whiteboards, one with permanent musical staff lines  
Student Furniture • Eighty (80) posture/stackable chairs 
• Eighty (80) music stands 
• Instrumental lessons and large group ensembles require 48” of space per 
student 
Other Furniture • One (1) conductor stand 
• Large Move and Store cart for music stands 
• Electronic keyboard  
Special Accommodations • Acoustical treatment for each room 
Classroom Technology • Sound system 
• Classroom technology per Granby District Standards 
Computers  • Teacher technology per Granby District Standards 
• Computer with access to high quality sound system control 
 
PRACTICE ROOMS 
SPACE: 80 square feet 
NUMBER: Four (4) rooms  
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile 
Student Furniture • Four (4) student chairs and music stands 

Page 58

April 2026 
Granby Memorial Middle School, Granby, CT Page 17 
PRACTICE ROOMS 
Accommodations  • Door with large window for supervision 
• Sound-proofing treatment 
 
MUSIC LIBRARY/STORAGE 
SPACE: 200 square feet 
NUMBER: One (1) room  
Access • Adjacent to Music Classrooms 
Storage • Built-in file system to accommodate music libraries 
Lighting • Soft color, dimmable lighting 
Flooring • LVT/VCP tile 
 
INSTRUMENT STORAGE 
SPACE: 350 square feet 
NUMBER: One (1) room  
Student Storage • Built-in lockable storage for instruments  
Lighting • Soft color, dimmable lighting 
Flooring • LVT/VCP tile 
 
SHARED MUSIC OFFICE 
SPACE: 200 square feet 
NUMBER: One (1) room (shared by three staff) 
Teacher Storage • Lockable teacher storage wardrobe for three (3) adults 
• Three (3) lockable four-drawer filing cabinet  
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile 
Display • Magnetic whiteboard 
• Bulletin Boards 
Teacher Furniture • Three (3) Teacher desks/chairs 
Computers  • Teacher technology per Granby District Standards 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Page 59

April 2026 
Granby Memorial Middle School, Granby, CT Page 18 
GENERAL EDUCATION SUPPORT SERVICES 
 
LIBRARY MEDIA CENTER 
SPACE:  3,305 square feet Total: 
                      Library – 1,405 square feet 
                      Innovative Tech Classroom – 1.000 square feet  
                      Media Center Office – 150 square feet 
                      Media Center Workroom/Storage – 250 square feet 
                      Media Center Collaboration Space – 200 square feet 
                      Technology Prep Room – 300 square feet 
Access • Centrally located in the school 
• Access to outdoor garden area, desirable  
• Adjacent to Innovative Tech Lab  
Storage • Audio-visual storage cabinets 
• Over-size vertical filing cabinet 
• Storage/display for teacher resources and professional development materials 
Teacher Storage • Two (2) lockable four-drawer filing cabinets 
Lighting • Remote control room darkening blinds 
Flooring • Carpet tiles 
Display • Magnetic whiteboards 
• Bulletin Boards 
• Well-placed and secure space for displays and promotional materials 
Student Furniture • Tables and chairs; easy to reconfigure 
• Computer furniture/workstations for six (6) student computers for accessing 
online catalogue  
Teacher Furniture • Two (2) teacher desks/chairs; Two (2) adult chairs 
Other Furniture • 48-inch free standing, double-faced shelving for student print materials; on 
wheels for adjusting space layout 
• Comfortable lounge style seating – adult and student 
Space Considerations • Area for independent study; separate area for whole class instruction  
• Maker Space area 
• Space should be able to accommodate staff professional development activities 
Classroom Technology • Sufficient outlets to support all technology; some floor outlets 
• Sound system for large group events 
• Online circulation system 
• Large screen interactive system 
• Classroom technology per Granby District Standards 
• Large printer 
Computers • Teacher technology per Granby District Standards  
 
GUIDANCE COUNSELING CENTER 
SPACE:  450 square feet  
Access • In close proximity to? 
Lighting • Soft color, dimmable lighting 
Storage  • Closed cabinetry 
Flooring • VCT/VCP tile 
Display • Multiple Whiteboards 
• Bulletin Boards 

Page 60

April 2026 
Granby Memorial Middle School, Granby, CT Page 19 
GUIDANCE COUNSELING CENTER 
Furniture • Four (5) student tables and chairs to accommodate 16 
Classroom Technology • Classroom technology per Granby District Standards 
Computers • Teacher technology per Granby District Standards  
 
GUIDANCE COUNSELOR OFFICE 
SPACE: 150 square feet 
NUMBER: Two (2) rooms  
Storage • One (1) lockable four-drawer filing cabinet 
• Bookcase and closed shelving 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile 
Display • Magnetic whiteboard 
• Bulletin Board 
Teacher Furniture • Teacher desk/chair 
Other Furniture • One (1) adult visitor chair  
• One (1) table, with 4 student chairs  
Computers  • Teacher technology per Granby District Standards 
 
GUIDANCE SUPERVISOR OFFICE (6-12) 
SPACE: 150 square feet 
NUMBER: One (1) office 
Storage • One (1) lockable four-drawer filing cabinet 
• Bookcase and closed shelving 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile 
Display • Magnetic whiteboard 
• Bulletin Board 
Teacher Furniture • Teacher desk/chair 
Other Furniture • One (1) adult visitor chair  
• One (1) table, with 4 student chairs  
Computers  • Teacher technology per Granby District Standards 
 
GUIDANCE CONFERENCE ROOM/CLASSROOM 
SPACE: 450 square feet 
NUMBER: One (1) room 
Access/Location • Within the Guidance Suite  
Storage • Built-in closed storage 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile 
Office Furniture • Conference Table 
• Seating for ten (10) 
Other Accommodations • Magnetic whiteboard 
• Bulletin board 
Technology • Polycom telephone 
• Large screen interactive system 

Page 61

April 2026 
Granby Memorial Middle School, Granby, CT Page 20 
GUIDANCE CONFERENCE ROOM/CLASSROOM 
Computers • One (1) computer 
 
GUIDANCE FILE ROOM 
SPACE: 200 square feet 
NUMBER: One (1) room 
Access/Location • Adjacent to Guidance offices  
Storage • Four (4) three-drawer lateral filing cabinets; lockable 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile 
Furniture • One (1) Table 
• Two (2) adult chairs 
 
GENERAL EDUCATION INTERVENTION SERVICES – READING AND MATH 
SPACE:  450 square feet  for Reading and Math 
NUMBER: Two (2) rooms 
Access • In close proximity to general education classrooms  
Classroom Storage • Built-in bookcases 
• Supply closets with shelving installed in each room 
• Counters under windows where possible 
• Separate literacy book closet in centralized location to classrooms 
Teacher Storage • Lockable teacher storage wardrobe for three (3) adults 
• Two (2) lockable four-drawer filing cabinets (each office) 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile 
Display • Magnetic whiteboards 
• Bulletin Boards 
Student Furniture • Moveable work tables to allow for open space for movement within Math 
Intervention space 
Teacher Furniture • One (1) Teacher desk/chair 
• Two (2) horseshoe/kidney-shaped tables with chairs to accommodate 6 students 
Other Furniture • Visitor’s chairs 
Classroom Technology • Classroom technology per Granby District Standards 
Computers  • Teacher technology per Granby District Standards 
 
SPECIAL EDUCATION PROGRAMS 
 
SPECIAL EDUCATION RESOURCE 
SPACE  450 square feet  
NUMBER: Four (4) classrooms (1 per team) 
Access • Close proximity to general education classrooms and to each other 
• Close proximity to related services (SW/Psych/SLH), preferred 
Classroom Storage • Built-in bookcases 
• Storage areas 
• Counters under windows where possible 

Page 62

April 2026 
Granby Memorial Middle School, Granby, CT Page 21 
SPECIAL EDUCATION RESOURCE 
Teacher Storage • Lockable teacher storage wardrobe for three (3) adults 
• One (1) lockable four-drawer filing cabinet 
• Access to shared testing materials 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile 
Display • Magnetic whiteboards 
• Bulletin Boards 
Student Furniture • Student tables/chairs (adjustable/movable) 
Teacher Furniture • Teacher desks/chairs 
Other Furniture • Adult visitor chair 
• Activity Groups: Two (2) tables with six (6) chairs  
• Portable dividers 
• Sensory area 
Classroom Technology • Classroom technology per Granby District Standards 
Computers  • Teacher technology per Granby District Standards 
 
LIFE SKILLS CLASSROOM 
SPACE: 600 square feet  
NUMBER: One (1) classroom 
Toilet • Toilet facility with changing table and storage 
• Epoxy flooring 
Sinks • Stainless steel sink with laminate counter 
• Soap and towel dispenser 
Classroom Storage and 
Arrangement 
• Built-in bookcases, storage areas, large-drawer storage 
• Kitchen (refrigerator, microwave, washer/dryer, cabinets for dishware, utensils) 
• Counters under windows where possible 
Teacher Storage • Lockable teacher storage wardrobe for three (3) adults 
• One (1) lockable four-drawer filing cabinet  
Student Storage • 10 coat hooks/storage 
• Cubby storage for 10 students 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile 
Display • Magnetic whiteboards 
• Bulletin Boards 
Student Furniture • Tables and appropriate student furniture for program activities 
• Soft furniture 
Teacher Furniture • Teacher Desk/Chair; adult chair 
Special Needs/Equipment • Separate area for calming, de-stress (Sensory Room: soft furniture; soft 
dimmable lighting) 
• Individual learning stations 
• Common meeting area 
Classroom Technology • Classroom technology per Granby District Standards 
Computers  • Teacher technology per Granby District Standards 
 
 SPEECH/LANGUAGE/HEARING SERVICES  
SPACE: 175 square feet 
NUMBER: One (1) office 
Storage • One (1) lockable four-drawer filing cabinet 

Page 63

April 2026 
Granby Memorial Middle School, Granby, CT Page 22 
 SPEECH/LANGUAGE/HEARING SERVICES  
• Bookcases and shelving (open and closed shelving) 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile 
Display • Magnetic whiteboard 
• Bulletin Board 
Teacher Furniture • Teacher desk/chair 
Other Furniture • Two (2) adult chairs 
• One (1) table, with 4 student chairs 
Special Needs/Equipment • Built-in mirror 
Computers  • Teacher technology per Granby District Standards 
 
PSYCHOLOGIST OFFICE 
SPACE: 150 square feet 
NUMBER: One (1) office 
Storage • One (1) lockable four-drawer filing cabinet 
• Bookcase and closed shelving 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile 
Display • Magnetic whiteboard 
• Bulletin Board 
Teacher Furniture • Teacher desk/chair 
Other Furniture • Two (2) adult chairs  
• One (1) table, with 4 student chairs  
Computers  • Teacher technology per Granby District Standards 
 
OT / PT RESOURCE ROOM  
SPACE: 450 square feet 
NUMBER: One (1) room with large walk-in closet for storage 
Sinks • One (1) stainless steel sink with laminate countertops 
• Soap and towel dispenser 
Access • In the vicinity of general education classrooms 
Classroom Storage • Built-in bookcases, cabinets (variety of open and closed) 
• Walk-in storage for large equipment  
• Counters under windows where appropriate 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile  
• Four (4) panel mats (6’x12’) 
Display • Whiteboard 
• Bulletin Boards 
Special Needs/Equipment • Capability to suspend therapeutic swing from ceiling 
• Three (3) fine motor centers 
Teacher Storage • Lockable teacher storage wardrobe for two (2) adults 
• Two (2) lockable four-drawer filing cabinets 
Teacher Furniture • Two (2) Teacher Desk/Chairs  
Computers  • Teacher technology per Granby District Standards 
 

Page 64

April 2026 
Granby Memorial Middle School, Granby, CT Page 23 
SOCIAL WORKER OFFICE 
SPACE: 150 square feet 
NUMBER: One (1) office 
Storage • One (1) lockable four-drawer filing cabinet 
• Bookcase and closed shelving 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile 
Display • Magnetic whiteboard 
• Bulletin Board 
Teacher Furniture • Teacher desk/chair 
Other Furniture • Two (2) adult chairs 
• One (1) table, with 4 student chairs 
Computers  • Teacher technology per Granby District Standards 
 
STUDY SKILLS PROGRAM 
SPACE  450 square feet  
NUMBER: One (1) classroom 
Access • Close proximity to general education classrooms and to each other 
• Close proximity to related services (SW/Psych/SLH), preferred 
Classroom Storage • Built-in bookcases 
• Storage areas 
• Counters under windows where possible 
Teacher Storage • Lockable teacher storage wardrobe for three (3) adults 
• One (1) lockable four-drawer filing cabinet 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile 
Display • Magnetic whiteboards 
• Bulletin Boards 
Student Furniture • Student tables/chairs (adjustable/movable) for fifteen (15) students 
Teacher Furniture • Teacher desks/chairs 
Other Furniture • Adult visitor chair 
• Activity Groups: Two (2) tables with six (6) chairs  
• Portable dividers 
• Sensory area 
Classroom Technology • Classroom technology per Granby District Standards 
Computers  • Teacher technology per Granby District Standards 
 
SUPERVISOR’S OFFICE 
SPACE: 150 square feet 
NUMBER: One (1) office 
Storage • One (1) lockable four-drawer filing cabinet 
• Bookcase and closed shelving 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile 
Display • Magnetic whiteboard 
• Bulletin Board 
Teacher Furniture • Teacher desk/chair 

Page 65

April 2026 
Granby Memorial Middle School, Granby, CT Page 24 
SUPERVISOR’S OFFICE 
Other Furniture • Two (2) adult chairs 
Computers  • Teacher technology per Granby District Standards 
 
ADMINISTRATION & SUPPORT SERVICES 
Unless otherwise noted, the standard furnishings for every area noted below are expected to include the following: 
• Room darkening shades 
• Acoustical insulation for soundproofing 
• Year-round air conditioning 
• ADA compliant building standards 
• Wireless/internet access 
• Multiple electric outlets 
• Telephone 
 
PRINCIPAL’S OFFICE 
SPACE: 200 square feet 
Access/Location • Close proximity to secretary’s workstation and conference room 
Storage • One (1) large wall unit bookcase 
• Lockable lateral files 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile 
Office Furniture • Desk/Chair/Credenza 
• Visitor seating for four (4) 
Other Accommodations • Bulletin board 
• White board 
• Private lavatory 
Technology • Polycom telephone 
• Building security system monitor 
• Security “panic” button with dedicated phone line 
• Large screen interactive board 
Computers • Administrator technology per Granby District Standards 
 
ASSISTANT PRINCIPAL’S OFFICE 
SPACE: 175 square feet 
Access/Location • Close proximity to secretary’s workstation and conference room 
Storage • One (1) large wall unit bookcase 
• Lockable lateral files 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile 
Office Furniture • Desk/Chair/Credenza 
• Visitor seating for four (4) 
Other Accommodations • Bulletin board 
Technology • Polycom telephone 
• Building security system monitor 
• Security “panic” button with dedicated phone line 
• Large screen interactive board 
Computers • Administrator technology per Granby District Standards 
 

Page 66

April 2026 
Granby Memorial Middle School, Granby, CT Page 25 
MAIN OFFICE (SECRETARIAL AREA) 
SPACE: 800 square feet 
Access/Location • Adjacent to principal’s office  
• Main hallway wall should have multiple windows, and the Main Office should 
be able to view main entranceway of school and bus and/or visitor traffic  
• Connecting door between office and health suite 
• Staff lavatory within main office area 
Storage • Staff mailboxes within main office area 
• Base and wall cabinets with counter space 
• Lockable files for student confidential records, table and chairs (separate room) 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile 
Office Furniture • Two (2)Secretarial workstations (situated to face office entry) 
• Secretarial chairs 
• Security Officer station within main office/entry area (if required) 
• Additional worktable/counter area to separate secretarial space from waiting 
area 
• Visitor waiting area; seating  for four (4) 
Other Accommodations • Bulletin boards 
• Closet for coats 
• Copy/Supply Room 
• Kitchenette counter, small refrigerator, sink, microwave 
Technology • Network copier/fax machine 
• Building security system monitor (secretary/clerk) 
• Security “panic button with dedicated phone line (secretary/clerk) 
• Radio charging station 
• Parent access Kiosk computer 
Computers  • Office technology per Granby District Standards 
 
INSTRUCTIONAL SPECIALIST OFFICE 
SPACE: 150 square feet 
Storage • One (1) large wall unit bookcase 
• Lockable lateral files 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile 
Office Furniture • Desk/Chair/Credenza 
• Visitor seating for four (4) 
Other Accommodations • Bulletin board 
Technology • Large screen interactive board 
Computers • Administrator technology per Granby District Standards 
 
LIERACY SPECIALIST OFFICE 
SPACE: 150 square feet 
Storage • One (1) large wall unit bookcase 
• Lockable lateral files 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile 
Office Furniture • Desk/Chair/Credenza 
• Visitor seating for four (4) 

Page 67

April 2026 
Granby Memorial Middle School, Granby, CT Page 26 
LIERACY SPECIALIST OFFICE 
Other Accommodations • Bulletin board 
Technology • Large screen interactive board 
Computers • Administrator technology per Granby District Standards 
 
MATH COACH OFFICE 
SPACE: 150 square feet 
Storage • One (1) large wall unit bookcase 
• Lockable lateral files 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile 
Office Furniture • Desk/Chair/Credenza 
• Visitor seating for four (4) 
Other Accommodations • Bulletin board 
Technology • Large screen interactive board 
Computers • Administrator technology per Granby District Standards 
 
CONFERENCE ROOM 
SPACE: 300 square feet 
NUMBER: One (1) room 
Access/Location • One adjacent to Main Office/Principal’s Office and one near related services  
Storage • One (1) credenza 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile 
Office Furniture • Conference Table 
• Seating for ten (10) 
Other Accommodations • Magnetic whiteboard 
• Bulletin board 
Technology • Polycom telephone 
• Large screen interactive system 
Computers • One (1) computer 
 
HEALTH SERVICES  
SPACE: 800 square feet 
Toilet • Oversized accessible toilet room with sink and changing table 
• Epoxy flooring 
Sink • Sink with foot pedal controls (outside Toilet room) 
• Sink with eye wash 
Access/Location • Access to main office for assistance during times of emergency 
• Access through main corridor 
• Access to natural light; windows 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile  
Storage • Lockable cabinets for medication and medical supplies 
• Four (4) four-drawer lockable filing cabinets 
• Closet and extra storage for materials  
Office Furniture • Desk/chair facing room entry  

Page 68

April 2026 
Granby Memorial Middle School, Granby, CT Page 27 
HEALTH SERVICES  
• Bookcase 
• Table for testing/conferences (private) 
• Four (4) student chairs for waiting area 
Space Considerations • Recovery area with 3 cots with privacy curtains 
• Private space/office where nurse can speak privately with students/parents 
• Examination room 
• 25-ft space to conduct vision screenings 
Medical Equipment • Wheelchair/evac chair 
• Magnifying lamp 
• Rolling cart (portable emergency cart) 
• Examination table (separate room) 
Other Accommodations • AED with audible alarm box will be installed in the public access hallway.  
• Refrigerator with separate frost-free freezer compartment 
Technology • One (1) telephone with direct access to an outside line and ability to access 
classrooms; separate phone for student use 
• Portable phone for nurse 
• Fax machine 
• Printer  
Computers  • Health Room technology per Granby District Standards 
 
TEACHER WORKROOM 
SPACE: 450 square feet  
Access/Location • Close proximity to classroom area 
Lighting • Soft color, dimmable lighting 
Flooring • VCT/VCP tile 
Storage • Shelving and cabinets 
Furniture • Table and six (6) chairs 
Other Accommodations • Laminating machine 
• General office supplies 
Technology • Network copier/fax machine/scanner 
Computers  • One (1) teacher computer 
 
FOOD SERVICES – CAFETERIA 
SPACE: 2,340 square feet (enrollment [401] /3 lunch waves x 17.5 sf) 
                        +900 square feet (platform/stage) 
Sink • Bay sink with foot pedal for hand washing and Purell stations for students 
• Water bottle filler 
Access/Location • Adjacent to full kitchen and serving area 
• Exits to outdoors 
Lighting • Soft color, dimmable lighting 
Flooring • Resilient textured rubber flooring 
Storage • Storage room to accommodate tables/benches and chairs 
Furniture • Folding roll-away tables/benches with built-in seating, to accommodate 
approximately 130 students 
• Chair and desk for paraprofessional/cafeteria supervisor 

Page 69

April 2026 
Granby Memorial Middle School, Granby, CT Page 28 
FOOD SERVICES – CAFETERIA 
Other Accommodations • Recessed drinking fountains 
• Sound reducing measures 
• Sound proof divider between kitchen and cafeteria 
• Multiple display monitors 
Platform (Stage) • Two (2) sections of portable risers for use with the platform (one on the floor, 
and one on the platform) 
• Stage curtains and stage lighting 
• Drop down screen with projection system 
• High quality sound system 
• Drop-down acoustical wall at stage proscenium  
Technology • Localized public address system 
 
FOOD SERVICES – KITCHEN 
SPACE: 1,150 square feet – Kitchen 
 150 square feet – Food Manager’s Office  
Toilet • Locker room for five (5) with adjacent unisex toilet room 
Sink • One (1) three bay sink with drain board and garbage disposal 
• One (1) double well stainless-steel produce sink 
• One (1) triple well stainless-steel pot wash sink 
• Three (3) hand sinks with soap and towel dispensers 
Access/Location • In close proximity to Gymnasium 
Lighting • Task lighting over preparation areas 
Flooring • Epoxy flooring 
Storage • Safe 
• Four (4) stainless steel utility carts, three shelves, #300/400 capacity 
• One (1) stainless steel cart for tray storage, ADA accessible 
• Adequate space for annual supplies 
Furniture • Teacher desk/chair 
• Visitor’s chair 
Space Considerations • Large walk-in storeroom with heavy-duty wire mesh chrome-mate shelving on 
casters 
• Dishwasher room with necessary utilities (racks and tray carts) 
• Separate area for the cashier to count money with a safe 
• Two (2) serving lines with built-in hot and cold units  
• Can washing area (outside, near dock – custodial) 

Page 70

April 2026 
Granby Memorial Middle School, Granby, CT Page 29 
FOOD SERVICES – KITCHEN 
Food Services Equipment • One (1) slicer on stand 
• One (1) double steamer, pressure-less 
• Table top mixer 
• Two (2) double convection ovens with stand: single one-over-one unit 
• Two-burner stove top 
• Char broiler Grill 
• Sandwich Slide 
• Self-serve pizza counter 
• Deli Unit 
• Sono 
• Two (2) small double kettles 
• One (1) food processor (Robo Coupe) 
• Walk-in freezer, minimum 100 square ft. with shelving 
• Walk-in refrigerator, minimum 100 square ft. with shelving 
• One (1) pass-through refrigerator near serving line 
• Pass-through warmer 
• Free-standing warmer on wheels 
• Steam table with five (5) wells 
• Cold well in serving line for fruits, vegetables and salads 
• Option to change drop-in units to go hot or cold 
• Two (2) preparation tables (stainless steel) 
• One (1) baking center with table, baking rack with refrigerator underneath 
• Milk cooler  
• Ice cream freezer 
• Open-air cooler in front of registers 
• Exhaust fans (ventilation) for ovens, skillet, stove, etc. 
• Exhaust fans (ventilation) in washroom and pantry areas 
Technology • Two (2) cash registers and stand (point of sale system) 
• One (1) computer (Food Services Office) 
  
FACULTY LOUNGE 
SPACE: 600 square feet  
Access • Centrally located  
Toilet • Faculty toilets adjacent to faculty lounge 
Sink • Stainless steel sink with laminate counter 
• Soap and towel dispenser 
Lighting • Provide windows and maximize natural light 
Flooring • VCT/VCP tile 
Storage • Built-in upper and lower cabinets 
Furniture • Soft seating 
• Tables and seating for twenty (20) people 
Other Accommodations • Private room for phone calls, etc. 
Equipment • Microwave oven 
• Refrigerator 
• Coffee maker 
 
CUSTODIAL OFFICE AND CUSTODIAL STORAGE 
SPACE: 800 square feet  
Toilet • Locker room for four (4) with adjacent unisex toilet room 

Page 71

April 2026 
Granby Memorial Middle School, Granby, CT Page 30 
CUSTODIAL OFFICE AND CUSTODIAL STORAGE 
Access/Location • In close proximity to Cafeteria; loading/receiving dock/mechanical room 
Flooring • VCT/VCP tile 
Storage • Locked cabinet 
• Storage for outdoor equipment with access to exterior door 
• Storage for chemical/cleaning supplies 
• Storage for interior cleaning machines with charging stations 
Furniture • Desk/Chair 
• Three (3) adult chairs 
Computers  • Custodial technology per Granby District Standards 
 
STORAGE 
SPACE: 800 square feet – Instructional Storage (Literacy Book Room; Grade 6 storage; Grade 7 storage; Grade           
8 storage) 
 800 square feet – General Storage 
(These storage spaces are separate from custodial storage spaces for supplies and equipment; accounted for above.) 
VIII. COMMUNITY USE 
Granby Public Schools facilities serve as a vital resource for the community, providing space for a variety of 
programs and events that benefit students, families, and local organizations. The use of school buildings extends 
beyond the academic day, supporting activities that enrich the community and provide essential services: 
  
• Granby Parks and Rec uses the gym, cafeteria and library for basketball and other after school and 
town activities; 
• Granby Education Foundation uses the gym and library for fundraising events such as the annual 
"Puzzle Slam;" 
• GMMS is the town shelter location for town emergencies including power outages/storms; 
• The Parent Advisory Council meets in the library; 
• All district committee meetings for professional development, leadership and advisories meet in the 
GMMS library; 
• After School clubs are held in classrooms, the cafeteria, and library; 
• Unified sports teams use the GMMS gym. 
 
 By making school buildings available for community use, Granby Public Schools enhances access to essential 
programs, strengthens school-community partnerships, and maximizes the value of public facility.
IX. ENVIRONMENT – SYSTEMS – EQUIPMENT  
SYSTEM SPECIFICATIONS 
Building Systems • The building systems incorporated into the new construction will be designed in accordance with Connecticut High Performance Building standards, equivalent 
in performance to a LEED Silver rating. 
Heating/Cooling (HVAC) 
System 
• Heating & cooling should be produced with natural gas with a boiler for heating 
and roof top DX cooling.  
• All spaces are to receive air conditioning, but only those areas with summertime 
use will have the systems running year-round; all other areas will have systems 
set to dehumidification only during summer months. 
Needs to be 
reviewed by 
Facilities and 
IT 

Page 72

April 2026 
Granby Memorial Middle School, Granby, CT Page 31 
SYSTEM SPECIFICATIONS 
• Energy recovery units, VFD fan systems and pumps to be utilized in the design. 
• Perimeter heating will be provided by ceiling mounted radiant panels, cooled by 
a VAV system with each room served by a dedicated VAV box and hydronic 
reheat coil.   
• The use of “chill beams” will be considered for general heating and cooling.  
Designer to provide additional information on chill beam systems to Owner. 
• The gymnasium/auditorium and cafeteria will be served by separate variable 
speed air handlers.  Air handlers shall include a hot water heating coil and DX 
cooling coils. 
Climate Controls/ 
Ventilation System 
• The building will be designed with Direct Digital Control (DDC) systems 
(Distech or Automate logic) centrally tied into the School Facilities Department 
via Graphical User Interface. 
• Spaces should have independent, on demand heating, cooling and ventilation 
control for operational efficiency.   
• Each classroom will be provided with a temperature sensor and carbon dioxide 
sensor.  The carbon dioxide sensor is an energy saving device.  By sensing the 
carbon dioxide within the room, the outside air intake is adjusted, reducing the 
amount of outside air being heated or cooled, resulting in less energy used. 
• Climate controls/ventilation systems need to meet current codes and standards. 
• MDF and IDFs must be climate controlled (A/C) 
Lighting System • Efficient and appropriate natural lighting will be maximized within the facility as appropriate for the programmatic use of the spaces.   
• Motion sensors and dual switching will be installed in classrooms. 
• The use of LEDs throughout, with exceptions in specialty areas. 
• Attention should be given to security lighting for both interior and exterior of 
the building. 
• Emergency back-up will be via local battery ballasts. 
• The use of light shelves and light sensors for natural light to reduce electrical 
load shall be considered in locations where possible. 
Electrical (Power) System • Power to be provided by local utility company. • Consider solar roof mounted. 
• Distribution will include customer metering. 
• Emergency (whole building) generator to accommodate Life Safety needs. 
• Generator must be sufficient to support critical IT equipment in MDF and all 
IDFs as well as administrative offices and Nurse’s office. 
• Generator must support critical kitchen equipment with the intention being to 
cook, serve, and store food. (Hoods, ovens, serving line, freezer, refrigeration, 
etc.) 

Page 73

April 2026 
Granby Memorial Middle School, Granby, CT Page 32 
SYSTEM SPECIFICATIONS 
Technology  • There shall be a combined voice/data system with “VOIP” (Voice Over Internet Protocol) design. An AVAYA on premise system should be installed in 
alignment with other schools and municipal buildings. 
• Interactive classroom displays with webcam and adequate sound output in every 
classroom and meeting space. In the current building there are 75-inch 
Viewsonic ViewBoards installed.  
• Desktop computers and monitors for all office staff 
• Laptop computers and docking stations for all staff members 
• Chrome Book charging stations in every room. 
• Chrome Books for each student  
• Kiosk displays/devices should be installed at main entrance, café, and main 
rotunda areas. 
• Security camera displays are needed for main office staff 
• Multiple data drops with sufficient power in every classroom and meeting space. 
• Latest generation full WIFI coverage throughout the entire building. Current 
system is Ubiquity  
• Shared printing stations to support multiple classrooms in convenient locations 
throughout the building. 
• Head end equipment to be housed in an MDF with 24-hour environmental 
control. Network switches to serve data and POE+ and/or current standard to all 
data port in the building. 
• Windows Domain and File Server. All IDF closets require 24-hour 
environmental control. 
• Horizontal cabling shall be Category 6e plenum rated or contemporary 
equivalent. 
• Cable shall be run in corridors to support horizontal cable structure. 
• Fiber backbone between the MDF and IDF rooms shall be capable of at least 
10GB minimum anticipating future growth. 
• Fiber optical cable should be run from the high school MDF to the middle 
school to MDF and must support 10 GB as well as anticipate future growth. 
• Office space and workspace for Technology Personnel with sufficient data drops 
and power to support technology in the building. 
• Auditorium, lighting, sound, and projection systems should be installed 
• Café PA, sound, and projection systems should be installed 
• Storage for Technology Department is critical. 
Security • Digital video surveillance of exterior/interior areas of the building integrated with District system. 
• Electronic security system with keypad access control installed into the school. 
• Design the plan to prevent access to instructional areas of the school when 
community events take place in assembly areas during non-school hours. 
• Motion sensors shall be mounted in corridors. 
• Respond to future state and/or federal mandates related to security requirements 
for elementary facilities (i.e., panic button systems) 
• Door locks shall be Corbin Russwin and integrated with existing MPS system.  
Phone System  • A comprehensive, district-integrated phone system (dial-out) will be integrated into technology scope of the project, including hands-free and handle options. 
• Must be capable of reporting originating room identification as part of E911 
call. 
• Install phones in every room of the facility occupied by teachers or students at 
any given time, including all meeting, support and instructional spaces. 
• Provide Voice Over “IP” options. 

Page 74

April 2026 
Granby Memorial Middle School, Granby, CT Page 33 
SYSTEM SPECIFICATIONS 
Public Address • The building’s public address system is comprehensive and will be addressed as part of the technology component of the project to incorporate internal building 
communications as well as external communications.   
• The PA system should be developed in conjunction with the phone, clock, data 
• PA system should be connected with “Panic Button” system for lockdown 
alerts, as well as Bell system, and phone system for paging. 
• Secondary access to security and public address systems will be located in the 
MDF/Head End Room. 
Clocks • Clocks, similar to the phone system will be integrated into the technology component of the project. 
• All support and instructional spaces will be included. 
• System to have manual override capability in the event that Daylight Saving 
Times are adjusted by the Federal Government. 
Plumbing System • Plumbing fixtures/system will be designed per current and applicable codes. • Fixtures will be self-operating 
• Plastic piping to be considered for domestic water and heating where possible. 
• Floor drains with trap primers in gang toilet areas 
• Plumbed for full whole building sprinkler system 
Fire Protection • Building will be fully protected by a sprinkler system installed per NFPA 13. • Waterless fire suppression systems required in MDF and IDFs with appropriate 
redundant detection. 
Fire Alarm • The building will be protected by a fully addressable analog, manual and automatic fire alarm system. This system should be open source as to not vendor 
lock. The current Notifier system is vendor locked. 
Acoustics • The building will comply with ANSI S12.60-2002: Acoustical Performance Criteria, Design Requirements and Guidelines for Schools. 
• Suspended acoustical ceilings and/or acoustical decks will be installed 
throughout the building. 
• Corridor walls should be constructed of glazed concrete masonry units, or 
materials with a comparable NRC rating, and provide an adequate separation for 
sound control. 
• In specialized areas, such as media centers, appropriate acoustical treatments 
will be installed. 
• Sound field system will be provided in each classroom. 
Windows/Doors • Windows should be high efficiency, non-operational type with low e-glazing. • Emergency egress windows and rated doors will be installed in accordance with 
applicable codes. 
• Consider key fobs, thumb latches, vision panels – review with District and 
integrate with security section. 
• Door locks and FOB system shall integrate with GPS system.  
 
 
 
 
 
 

Page 75

April 2026 
Granby Memorial Middle School, Granby, CT Page 34 
X. SITE DEVELOPMENT 
There will be two primary entrance areas to the Middle School building: (1) the Main Entrance for visitors and parent 
drop off/pick up; (2) Student entrance for bus drop-off/pick up. Passive security measures, such as visual control of 
the entrances from the adjacent office areas, must be planned for. Active security measures and systems will be 
developed within the building design. Adequate lighting for monitoring activities and ensuring safety are of paramount 
importance at the building entrances. The entrance design should accommodate a separate bus loading and parent 
drop-off area. Entry overhangs or covered walkways will be provided for inclement weather to the extent practicable.  
Bus loading areas should be configured as a one-way drive in a direction to assure that loading and unloading of 
students occurs from the right-hand side of the vehicle adjacent to the building. The bus loading driveway should be 
located such that buses exit upstream of automobiles, thereby reducing delays. 
Parent drop-off areas will also be configured as a one-way drive in a direction to ensure that loading and unloading of 
students occurs from the right-hand side of the vehicle adjacent to the building. Student drop-off and pick-up areas 
are to be separated from the bus loading area, and preferably should be separate from other parking lots. 
A receiving/loading dock should accommodate 18-wheeler vehicles and should be located in such a way as not to 
interfere with primary entrance areas yet be close to kitchen/custodial areas. 
Sufficient parking for staff and visitors will be developed to take the multiple uses of the building into account. In 
determining the size and location of the parking lots, consideration will be given to the use of the building for 
community access as well as student safety. ADA and other code requirements will be addressed in the design of 
parking. 
Sidewalks will be featured around the perimeter of the school and shall be concrete with monolithic concrete curbing. 
Access to the parking lots, playfields, bus and parent pickup/drop-off areas, and access for student walkers will be 
addressed. The number of driveways that are crossed by sidewalks should be eliminated/minimized as much as 
practicable. 
The Middle School shall have an artificial turf multi-purpose field with a track as well as a baseball/softball field, both 
of which should have lighting. Athletic fields and playground areas shall include: controlled perimeter fencing; 
lockable gates for supervised access; and a fencing design that will maintain visibility while supporting security. 
Playfields, parking, service drives, drop-off zones and bus zones should be located in order to reduce the need for 
pedestrians to cross vehicular traffic lanes. The location of driveways, walkways and landscaping must permit 
adequate sight distances for both vehicles and pedestrians. 
Site utilities and physical plant components, including drives and access roads, will be located to avoid conflict with 
student and vehicular traffic, as well as the planned future growth of building components. 
Landscaping will be designed to allow the school to blend with the environment as well as to provide passive cooling 
and windbreaks when possible.  Trees and other greenery will be of a hearty variety with a preference for native 
species and require little maintenance and which complement the building and site.  Trees will be planted a sufficient 
distance from the building to avoid future maintenance problems.  Consideration will be given to safety and security 
when placing foliage around walkways and areas of building access. 
 
  

Page 76

April 2026 
Granby Memorial Middle School, Granby, CT Page 35 
GRANBY MEMORIAL MIDDLE SCHOOL 
 EDUCATIONAL SPECIFICATIONS SPACE SUMMARY  
Room Description Required # of Rooms Square Feet Per Room Total Area (Sq. Feet) 
ON-TEAM PROGRAMS 
Academic Core Classroom – ELA 4 900 3,600 
Academic Core Classroom – Math 4 900 3,600 
Academic Core Classroom – Integrated Science 4 900 3,600 
Academic Core Classroom – Global Studies/US History 4 900 3,600 
Academic Core Classroom – World Languages 3 900 2,700 
SUCCESS Program Classroom 1 900 900 
Total       18,000 
UNIFIED ARTS PROGRAMS 
Visual Arts Classroom 1 1,450 1,450 
Family Consumer Science Classroom 1 1,600 1,600 
Music Appreciation Classroom 1 1,000 1,000 
Music Storage (Guitars/drums/xylophones, etc.) 1 250 250 
Physical Education Program – Gymnasium 1 6,660 6,660 
Physical Education Program – Office 2 150 300 
Physical Education Program - Storage 1 600 600 
Gymnasium – Chair Storage 1 200 200 
Wellness Education Classroom 1 900 900 
Technology Lab – Woodworking 1 1,200 1,200 
Technology Lab – CAD 1 1,000 1,000 
Total   15,160 
ELECTIVE PROGRAMS 
Band 1 1,500 1,500 
Chorus 1 1,500 1,500 
Orchestra 1 1,200 1,200 
Practice Rooms 4 80 320 
Music Library/Storage 1 200 200 
Instrumental Storage 1 350 350 
Shared Office (for 3) 1 200 200 

Page 77

April 2026 
Granby Memorial Middle School, Granby, CT Page 36 
Total      5,270 
GENERAL EDUCATION SUPPORT SERVICES 
Library Media Center 1 1,405 1,405 
Innovative Technology Classroom 1 1,000 1,000 
Media Center Office 1 150 150 
Media Center Workroom/Storage 1 250 250 
Media Center Collaboration Space 1 200 200 
Technology Prep Room 1 300 300 
Guidance Counseling Center  1 450 450 
Guidance Counselor Office 2 150 300 
Guidance Supervisor Office (6-12) 1 150 150 
Conference/Classroom 1 450 450 
Guidance File Room 1 200 200 
Reading Intervention Support 1 450 450 
Math Intervention Support 1 450 450 
Total   5,755 
SPECIAL EDUCATION PROGRAMS 
Special Education Resource Room (1 per team) 4 450 1,800 
Life Skills Classroom 1 600 600 
Speech/Language/Hearing Office 1 175 175 
Psychologist Office 1 150 150 
OT/PT Resource Room/Storage 1 450 450 
Social Worker Office 1 150 150 
Study Skills Program 1 450 450 
Supervisor’s Office 1 150 150 
Total   3,925 
ADMINISTRATION & SUPPORT SERVICES 
Principal’s Office 1 200 200 
Assistant Principal’s Office 1 175 175 
Main Office Secretarial Area 1 800 800 
Instructional Specialist Office 1 150 150 
Literacy Specialist Office 1 150 150 

Page 78

April 2026 
Granby Memorial Middle School, Granby, CT Page 37 
Math Coach Office 1 150 150 
Conference Room 1 300 300 
Health Services 1 800 800 
Teacher Workroom 1 450 450 
Food Services – Cafeteria/Auditorium 1 2,340 2,340 
Platform/Stage 1 900 900 
Food Services – Kitchen and Manager’s Office 1 1,300 1,300 
Faculty Lounge 1 600 600 
Custodial Office Area and Storage 1 800 800 
Instructional Storage throughout building 4 200 800 
General Supply Storage 1 800 800 
Total   10,715 
Total Program Area    58,825 
 
*The programmable spaces do not include circulation, mechanical spaces, bathrooms, or any spaces required but not 
determined at this time. It is recommended to add 30% for these additional space requirements. 
 
 
 
 
 
 
 

Page 79

  
 
PROJECT PROPOSAL 
 
GRANBY MEMORIAL HIGH SCHOOL   
BASEBALL & SOFTBALL IMPROVEMENTS 
 
                
                     
 
 
 
 
 
 
 
 
                    Existing Conditions Aerial 
 
 
 
 
Conceptual Layout  
 
Date:  January 19, 2026 
Prepared For:  Christopher DeGray, Director of Facilities – Granby Public Schools              
Prepared By:  Andrew Dyjak – Regional Vice President, New England 
  Chris Hulk, PE – Regional Vice President, New England 
  Jonathan Luster, PE – Regional Construction Manager, New England 
Address: Granby Memorial High School| 54 N Granby Rd, Granby, CT 06035 
 
This project proposal encompasses all facets of the project, with FieldTurf offering a comprehensive, turnkey solution 
that includes design, project oversight, and construction. The project is based on current site conditions, review meeting 
with the school, and the planned construction period in summer/fall 2026.  
FieldTurf pricing is based on the Capital Region Education Council (CREC) program. CREC is a member of The Association 
of Educational Purchasing Agencies (AEPA) program. The AEPA is a purchasing co-op that provides member schools with 
pre-determined preferential pricing by approved vendors. Since the product has already been bid at the national level, 
individual schools do not have to duplicate the formal bid process. AEPA IFB #024-A.  
 
 
      Click on the following AEPA hyperlink for more information:  AEPA IFB #24-A. 
 
All pricing includes prevailing wage. 
Below is a detailed cost breakdown for site construction, turf installation and overall implementation of the project. 
 

Page 80

  
 
PROJECT PROPOSAL 
 
BASE BID  
FIELD NAME Granby High School Baseball/Multipurpose Field 
SQUARE FOOTAGE +/- 138,000 s.f. 
PRODUCT  FieldTurf Double Play Natural – FTVT-50 
FIELD MARKINGS Baseball, Softball, Soccer, Lacrosse and Field Hockey  
TOTAL PRICE $ 3,147,505.00 
 
Project Description: 
This project proposes to reconstruct the existing baseball to a new all-weather synthetic turf field with baseball, softball 
and overlay fields. FieldTurf will provide a turnkey project with all necessary engineering, design, construction and 
project oversite.  
 
The existing field will have all fencing, topsoil, irrigation, and clay removed. Earthmoving activities will be conducted to 
achieve proposed grades. The field will then have the concrete turf anchor curbing, stone base, and drainage system 
installed. Fencing of various heights and sizes will be installed and be integral to the concrete turf anchor curb. 
Additionally, new shade structure dugouts with a tension netting backstop system extending from one dugout to the 
other is proposed. Lastly, empty conduits will be installed for future/alternative lighting system to be installed at a later 
date. Additional scope items such new LED light fixtures, bleachers, and walkways have been added as alternates to the 
base bid. 
 
Depending on final scope, the project is anticipated to be constructed in a ± 4-month timeframe. It is also anticipated 
that access and staging areas will be available nearby.  
➢ Note: All plans will be developed by FieldTurf in house licensed professionally engineering staff 
 
➢ Site Civil Construction    
o Install sediment and erosion controls including construction entrance pad 
o Remove existing topsoil, irrigation, fencing and dugouts  
• Topsoil to be removed from site 
o Import / export general fill to meet proposed field grades 
o Cut and cap existing irrigation system 
• Install turf box with quick coupler connection 
o Furnish and install concrete turf anchor curbing 
o Furnish and install 6’ ht. Black vinyl chain link fencing 
o Furnish and install (2) 30’ ht. Tension netting backstop 
o Furnish and install (4)10’x40’ shade structure dugouts on concrete slab with fence surround for 
each field  
o Furnish and install storm drainage piping and flat panel drains as necessary 
o Furnish and install (2)2” empty conduits for future lighting needs and stub conduits to each 
dugout and batting cage 
o Installation of dynamic stone base layers and storm drainage overflow 

Page 81

  
 
PROJECT PROPOSAL 
 
o Furnish and install concrete pads and walkways as shown 
o Furnish and install (2) batting cages with synthetic turf  
o Furnish and install bullpen areas per plan 
o Fine grade field in preparation of synthetic turf 
o Install finish materials and restore site to pre-construction conditions 
 
➢ Synthetic Turf   
o Furnish and install synthetic turf for field 
o Synthetic turf with rubber and sand infill  
o Furnish and install FieldTurf ‘easy change’ home plate, batters boxes, and pitching rubbers for 
each field 
o Colors and field markings as shown on rendering 
o No logos or specialize lettering 
o Post installation gmax field testing  
 
➢ Close Out        
o Supply maintenance training 
o Supply as-builts and close out package 
 
 
ALTERNATES: 
 
➢ Alternate: New Scoreboard                                 $96,500.00 
o Furnish and install multi-use scoreboard 
o Assumed programmable boards with display/naming panel above board 
o Scoreboard (8’h x 25’w) 
 
➢ Alternate: Portable Fencing                                 $47,500.00 
o Furnish And Assemble 350 l.f. Of 6’ ht. Portable fencing for synthetic turf 
o ‘Sporta-Fence’ with fence topper and wheel assembly for use in separating fields 
 
➢ Alternate: LED Lighting System Infrastructure                               $143,750.00 
o Furnish and install new led lighting system foundations  
• Assumed 8 pole lighting system 
o Furnish and install electrical boxes and stub conduits into boxes 
o (2) 2” electrical conduits to be provided within base scope of work 
 
➢ Alternate: New LED Lighting Fixtures                                 $578,065.00 
o Assumes new power supply withing 100’ of field 
o Furnish And Install New Led Light System  
• Poles, Fixtures, Wiring, And Controls  
o Assumed 8 Pole System with standard soils and no rock drilling 
o Furnish And Supply Power To Each Dugout And Batting Cage Area 
 
 
 

Page 82

  
 
PROJECT PROPOSAL 
 
➢ Contingency        
o A typical project of this type and scope we would suggest a contingency for design, general 
conditions, and construction of 5% - 8%. This contingency would provide the School / Town level 
of safety for unknown site conditions such as rock removal, unsuitable soils, etc. 
EXCLUSIONS 
➢ Any costs associated with necessary charges 
relating to the delineation of the field 
➢ The supply of manholes or clean-outs or grates, 
or supply of the manhole covers outside of field 
area 
➢ Any alteration or deviation from specifications 
involving extra costs, which alteration or 
deviation will be provided only upon executed 
change orders, and will become an extra charge 
over and above the offered price 
➢ Soil stabilization or remediation of any type 
➢ Rock excavation or ledge removal 
➢ Offsite disposal of generated spoils other than 
topsoil 
➢ Taxes 
➢ Excavation or disposal of unsuitable or 
contaminated soils 
➢ Site security including security fencing  
➢ Once subgrade has been established, a proof 
roll will be performed to ensure structural 
stability of the soils; in the event that unsuitable 
soils are encountered, a price to remedy these 
areas can be negotiated based on 
recommended methods per project Engineer 
➢ Testing or Inspection Fees 
➢ Site restoration, sodding, landscaping or grow-
in beyond disturbed areas 
➢ Repair or resurfacing existing asphalt parking 
lot if damaged by truck traffic 
➢ Bond fees and non-local permits 
 
 
Please feel free to reach out to any member of our project team with questions about our offer: 
 
Andrew Dyjak 
Regional Vice President 
(860) 333-7839 
Andrew.Dyjak@Fieldturf.com
 
  
Chris Hulk 
Regional Vice President 
203-676-4445 
christopher.hulk@fieldturf.com  
 
 
 
Jonathan Luster, PE 
Regional Construction Manager 
(860) 227-4915 
Jonathan.Luster@FieldTurf.com 
Thank you again for your interest in FieldTurf, we look forward to working with you. 
                         
Per:     
Marie-Christine Raymond, Director of Operations 
FieldTurf USA, Inc. / Tarkett Sports Canada, Inc. 
 
FieldTurf USA, Inc. holds the Cooperative Purchase contract, any PO for Contract must be made out to 
FieldTurf USA, Inc. 175 N Industrial Blvd NE. Calhoun, GA 30701 
If you have questions regarding the FieldTurf and Beynon SmartBuy Cooperative Purchasing Program, 
please contact Eric Fisher at:  Eric.Fisher@smartbuycooperative.com. 
 

Page 83

  
 
PROJECT PROPOSAL 
 
a) This bid proposal and its acceptance is subject to 
strikes, accidents, delays beyond our control and 
force majeure. 
b) FieldTurf’s preferred payment terms are as 
follows: (i) 50% of the Price upon Customer’s 
execution of contract; (ii) 40% of the Price upon 
shipment of materials from FieldTurf’s 
manufacturing facility; and (iii) Remaining balance 
of ten percent (10%) upon substantial completion 
of the field, which shall be achieved when 
Customer is able to use the field for its intended 
purpose, even if punchlist items remain and the 
Certificate of Completion has not been executed 
by Customer.  
c) Accounts overdue beyond 30 days of invoice  
date will be charged at an interest rate of 10%  
per annum. 
d) FieldTurf requires a minimum of 21 days after 
receiving a fully executed contract or purchase 
order and final approvals on shop drawings to 
manufacture, coordinate delivery and schedule 
arrival of installation crew. Under typical field size 
and scenario, FieldTurf further requires a minimum 
of 28 days per field to install the Product subject to 
weather and force majeure 
 
e) FieldTurf requires a suitable staging area. Staging is 
anticipated in the last row of parking in the adjacent 
parking lot.  minimum access of 15 feet wide by 15 
feet high, and, no more than 100 ft from the site. A 
25 foot wide by 25 foot long hard or paved clean 
surface area located within 50 feet of the playing 
surface shall be provided for purposes of proper 
CONDITIONS 
Notwithstanding any other document or agreement entered into by FieldTurf in connection with the 
supply and installation only of its product pursuant to the present bid proposal, the following shall 
apply:
 
 
 
 
mixing of infill material. Access to any field will include 
suitable bridging over curbs from the staging area to 
permit suitable access to the field by low clearance 
vehicles. Staging area surface shall be suitable for 
passage with motor vehicles used to transport 
materials to the site and/or staging area. FieldTurf 
shall not be liable for any damages to the staging 
area or its surface unless such damages are caused 
by FieldTurf’s intentional misconduct or negligence. 
f) This proposal is based on a single mobilization. If 
the site is not ready and additional mobilizations 
are necessary, additional charges will apply. 
g) Upon substantial completion of FieldTurf’s 
obligations, the Customer shall sign FieldTurf’s 
Certificate of Completion in the form currently in 
force; to accomplish this purpose, the Customer will 
ensure that an authorized representative is present 
at the walk-through to determine substantial 
completion and acceptance of the field, which may 
include a list of punch list items. 
h) FieldTurf shall not be a party to any penalty clauses 
and/or liquidated damages provisions. 
i) FieldTurf shall be entitled to recover all costs and 
expenses, including attorney fees, associated with 
collection procedures in the event that FieldTurf 
pursues collection of payment of any past  
due invoice. 
j) All colors are to be chosen from FieldTurf’s 
standard colors. 
 
THE TARKETT SPORTS FAMILY - LEADERS IN SPORTS SURFACING 
6/6 

Page 84

3
1
2
5
4
c
50 SEATS c
3
1
2
5
4
c
50 SEATS c
3
1
2
5
4
c
50 SEATS
c
GRANBY MEMORIAL HIGH SCHOOL
BASEBALL FACILITY IMPROVEMENTS
PLEASANT STREET
GRANBY, CONNECTICUTJANUARY 15, 2026
BASEBALL
AND
SOFTBALL
Drawing: C:\USERS\T017224\ONEDRIVE - TARKETT\US09 - TEAM - ESTIMATING - DOCUMENTS\2024 BID ACTIVITY\CONNECTICUT\GRANBY\GRANBY HS CONCEPTS FINAL 2.DWG Layout Tab:BASEBALL (2)Plotted by: T017224    On this date: Thu, 2026 January 15 - 2:47pm
0'15'30'
SCALE: 1"=30'
60'
NOTES:
1)ALL DESIGN AND EXISTING CONDITIONS MAPPING BASED
ON AVAILABLE MAPPING AND SHOULD BE CONSIDERED
APPROXIMATE.
2)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA
AND REQUIRES A CERTIFIED FIELDTURF INSTALLER AND
BUILDER TO IMPLEMENT THE PROPOSED CONDITIONS.
3)FINAL LOCATIONS AND SIZES OF PROPOSED CONDITIONS
ARE SUBJECT TO CHANGE.
DUAL BULLPEN
SYNTHETIC TURF FIELD
±140,000 S.F.
BASEBALL 310' L, 330'R, 490' C
 SOCCER 330'x195'
SOFTBALL: 210' RADIUS
FOUL POLE INTEGRAL TO FENCE
LINE
DUAL BATTING CAGES FOR BOTH
SOFTBALL AND BASEBALL
GAME SHADE STRUCTURE DUGOUT WITH
FENCE SURROUND ON CONCRETE PAD
(TYPICAL)
CONCRETE PAD AND
ACCESS FOR PORTABLE
BLEACHERS
VISITING BULLPEN
POTENTIAL BLEACHER PAD
BACKSTOP WITH TENSION NETTING
AND WALL SYSTEM
ATHLETIC FIELD LIGHTING
(TYPICAL)
IMPROVED FIELD ACCESS
30' HT. TENSION NETTING
BACKSTOP
PORTABLE FENCING
FULLY PROGRAMMABLE
SCOREBOARD
BACKSTOP AND HOME PLATE LOGO
PITCHING MOUNDEASY CHANGE MOUND
HOME PLATEDUGOUT SHADE STRUCTURE
FIELD EDGE AND BASESUBGRADE WITH COLLECTOR PIPE
BATTING TUNNEL
MEGA TUNNEL BATTING CAGE WITH POWER
SUPPLY FOR PITCHING MACHINES
CONCRETE TURF ANCHOR CURB WITH
INTEGRAL FENCE POSTS. 8" STONE BASE WITH
2" TOPPING STONE AND 6" DYNAMIC STONE
BASE. SIEVE AND LA ABRASION TESTING TO
MEET FIELDTURF STANDARDS
LASER GRADE AND PROOF ROLL SUBGRADE.
PITCH TO COLLECTOR PIPE AT LOW POINT.
INSTALL 8"-12" COLLECTOR PIPE AND OUTLET.
ADJUSTABLE HOME PLATE SET IN CONCRETE PAN.
REMOVABLE VELCRO BATTING AND CATCHERS
BOXES. 3 REPLACEMENT KITS INCLUDED
SHADE STRUCTURE DUGOUT ON CONCRETE
BASE WITH FENCE SURROUND
CONCRETE MOUND FOR STABILITY AND
LONGEVITY FOR GAME MOUND
FIELDTURF EASY CHANGE MOUND SYSTEM FOR
GAME FIELD. REPLACEABLE SECTIONS OF MOUND
SET IN CONCRETE PAN FOR EASE OF
REPLACEMENT. 3 REPLACEMENT SETS INCLUDED
ALL BACKSTOPS TO BE 30' HT. TENSION
NETTING ABOVE 6' HT. HEAVY DUTY FENCING.
24' TALL NETTING ABOVE FENCE. AS
MANUFACTURED BY SPORTSFIELD SPECIALTIES
OR JAYPRO SPORTS
EXAMPLE PROJECT
EXAMPLE PROJECT
EXAMPLE PROJECT
EXAMPLE PROJECT
FALL START FOR CONSTRUCTION FOR
SYNTHETIC TURF BASEBALL FIELD WITH
COMPLETION DURING WINTER MONTHS
HIGH PROFILE SYNTHETIC TURF BASEBALL
FIELD WITH ALTERNATING PANELS
DOUBLE FIELD WITH OVERLAYS
HIGH PROFILE SYNTHETIC TURF BASEBALL
FIELD

Page 85

 
Granby Memorial High School Turf Track and Field 
 
Priority Funding for Turf Track and Field Replacement at Granby Memorial High School 
A top priority for funding is the replacement of the turf track and field at Granby Memorial High School. 
Originally installed in 2013, the track has been meticulously maintained and serves as a source of pride and 
enjoyment for both the school district and the greater Granby community. 
The track is a vital community asset, used daily by residents for walking, running, and athletic training. Granby 
students rely on the track and field for physical education, wellness, and recreation across three seasons each year. 
Additionally, Stadium Field is an essential facility that supports not only football but also boys’ and girls’ soccer, 
lacrosse, field hockey, and cheerleading. Beyond athletics, the field hosts major events such as the annual GMHS 
graduation ceremony, Bearcats football games, and community fundraisers, including the Alzheimer’s Walk. 
Urgent Need for Repairs 
In recent years, the track and field have faced significant structural challenges, including the formation of 
sinkholes. These issues have progressed to the point where track and field meets can no longer be hosted, and 
safety concerns have led to restrictions on community access. 
Turf fields generally have a lifespan of 8–10 years, which can be extended to 10–15 years under optimal 
conditions. However, as the GMHS field enters its 12th year, it has exceeded its expected lifespan, and due to 
unique environmental factors, a full replacement is both warranted and necessary. 
Cost and Remediation Efforts 
The estimated cost to replace the track and field, including the necessary remediation to address existing structural 
challenges, exceeds $2 million. 
In 2022, the geotechnical firm Haley Aldrich conducted subsurface testing, including seven 15-foot deep geoprobe 
test holes, to investigate the cause of recurring sinkholes and surface depressions. Their analysis revealed the 

Page 86

presence of air pockets and poorly graded soil beneath the track area. In 2024, GZA Geotechnical Services 
reviewed the initial findings, conducted a site visit, and confirmed the assessment. 
Both firms concluded that organic materials, such as tree stumps left unexcavated during the original construction, 
are decomposing over time, creating air pockets that cause the sand layers to sink and surface layers to depress. 
Additionally, concerns were raised about significant levels of poorly graded sand and air pockets at depths ranging 
from 1 to 10 feet in various locations. 
To ensure long-term stability, experts recommend a comprehensive remediation process, including soil removal, 
excavation, screening for organic materials, and multiple layers of soil compaction before reinstatement. Without 
these corrective measures, the risk of additional sinkhole formations in the coming years remains high. 
The following samples illustrate the existing subsurface conditions at GMHS, with each container representing 
depths of up to 15 feet. 
 
                          
                                   
 Unaffected Turf Field                                             Granby Turf Field 
                       Properly compacted soil (yellow)                                      Uncompacted soil w/ pockets of debris and air  
                                                                                                                                 (yellow) 
                       Properly compacted / installed base (yellow)               Sinking levels of subsurface (blue) 
                       Level base surface (blue)                                                      Sinking base level (white) 
                       Level turf surface (green)                                                     Uneven, depressed, and sinking turf surface (red) 
 

Page 87

  
 
PROJECT BUDGET 
 
GRANBY MEMORIAL HIGH SCHOOL   
TRACK & FIELD IMPROVEMENTS  
                
                     
 
 
 
 
 
 
 
 
                          Existing Conditions Aerial 
 
 
 
 
Conceptual Layout  
 
Date:  October 2, 2025 
Prepared For:  Karl Gates - Athletic Director & Student Activities Coordinator              
Prepared By:  Andrew Dyjak – Regional Vice President, New England 
  Chris Hulk, PE – Regional Vice President, New England 
  Jonathan Luster, PE – Regional Construction Manager, New England 
Address: Granby Memorial High School| 54 N Granby Rd, Granby, CT 06035 
 
This budget proposal encompasses all facets of the project, with FieldTurf offering a comprehensive, turnkey solution 
that includes design, project oversight, and construction. The budget is based on current site conditions, review meeting 
with the school, and the planned construction period in spring/summer 2026.  
FieldTurf USA, Inc. is pleased to present the following proposal.  FieldTurf pricing is based on the Capital Region Education 
Council (CREC) program. CREC is a member of The Association of Educational Purchasing Agencies (AEPA) program. The 
AEPA is a purchasing co-op that provides member schools with pre-determined preferential pricing by approved vendors. 
Since the product has already been bid at the national level, individual schools do not have to duplicate the formal bid 
process. AEPA IFB #024-A. 
 
Click on the following AEPA hyperlink for more information:  AEPA IFB #24-A. 
 
Below is a detailed cost breakdown for site construction, turf installation and overall implementation of the project. 
 
 

Page 88

  
 
PROJECT BUDGET 
 
Project Description: 
The existing track and field at Granby Memorial High School is in need of significant remediation efforts from sinks holes 
that have developed along the track / field. Based on the original geotechnical information provided by the Town, it 
appears that organic material has decayed below the eastern side of the track / field. The depths of this material are 
present up to 10’ below existing grade. The Town then expanded the geotechnical investigation, to which the report 
indicated the entirety of the track and field area should be fully removed down to a depth of 5’ and the compacted back 
in lifts. With this understanding, FieldTurf has developed two options for reconstruction.  
Option 1: 
The first option would be to complete the work as outlined in the geotechnical report. This would include removal of all 
track surfacing, removal of all synthetic turf, removal of all curbing, removal of all utilities, removal of all foundations, 
removal of all fencing and all existing subbase materials down to a depth of 5’. It is assumed that a large portion of this 
material will need to be removed from the site and supplemented with clean fill or gravel. Once the site has been 
excavated to a depth of 5’ and in some indicated areas down to 10’, the reconstruction would start to occur. Materials 
would be installed in lifts and a third party geotechnical engineer would be hired by the Town to oversee and test the 
work. The existing electrical, audio, storm and any other utilities would be replaced. The concrete turf anchor curb and 
football goal posts would be reinstalled. All new fencing and paved access paths around the site would be reconstructed. 
Finally, a new synthetic track and field would be installed on the newly reconstructed site. Several unknowns remain, 
such as if shoring is required around the existing bleachers, buildings, scoreboard and light poles given the depths of 
excavation. It is also unclear to what extent the 10’ depth of excavation will be required. Field conditions may render the 
needed area to expand. Lastly, it is unknown is rock and ledge removal will be encountered to the depths that are 
shown. Rock removal and ledge removal is always an exclusion of any contract due to its unforeseen nature. The 
warranty for construction on this option would be a 1 year workmanship warranty, 8 year warranty on synthetic turf and 
5 year warranty on track materials. With all of these considerations in mind, FieldTurf felt it was in the best interest of 
the Town to  review a second option based on its ability to self-perform post-tension concrete tracks, fields, and courts.  
Option 2: 
This preferred option of FieldTurf would reconstruct the existing track and field area with post tension concrete. 
FieldTurf has completed both post tension tracks and post tension fields throughout the New England region and 
through out the country. This technology allows the majority of materials to stay in place and be spanned by the nature 
of how post tension concrete operates. Slabs of post tension concrete are designed to span areas of unsuitable soils, 
provide high strength and long lasting base for whatever the application may be. Many other types of construction use 
this technique for bridges, parking garage slabs, balconies, overhangs and other types of applications. The last major 
benefit is that FieldTurf, as part of Tarkett Sports, is able to provide a 25+ year warranty on the structural components of 
the installation. This means that the Town would be ensured to not be left in this type of situation again. The 
reconstruction efforts of this type of system would remove the track and field areas. Remove the top 4”-5” of materials, 
compact the existing subgrade, perform 20 augured holes in areas of known settlement, install flowable fill in those 
areas and then construct a new post tension concrete track and field. Improved drainage, ball netting and football goal 
posts would be installed. Fencing would be replaced and walkway areas around the track would be renovated to meet 
new grades. All surrounding site features including lights, bleachers, buildings, scoreboards can all remain in place 
without the need for additional shoring or replacement. 

Page 89

  
 
PROJECT BUDGET 
 
 
Lastly, alternates have been included for site improvements such as LED lighting, press box, ball netting, etc…  
 
Depending on final Option and scope selected, the project is anticipated to be constructed in a ±4-12 month timeframe. 
It is also anticipated that access and staging areas will be available nearby. This budget is intended to assist the school in 
preparing for this project. Additional discussions, review and programming will be required to refine the scope and 
budget prior to construction.  
 
FIELD REMEDIATION OPTIONS: 
➢ Option 1 – FULL RECONSTRUCTION TO A DEPTH OF 5’ OR MORE $9,370,000 - $11,080,000 
• General Scope: Reconstruction of entire track and field area up to limit of existing pavement beyond 
the existing fence line 
o Remove and dispose of existing track surfacing  
o Remove and dispose of existing synthetic turf surfacing 
o Remove and dispose all existing utilities, including storm drainage, electrical, audio and any 
other encountered utilities 
o Mill and remove all existing pavement and base materials. Salvage processed aggregate base 
for reuse. 
o Excavate, remove and salvage existing field stone base  
o Remove and dispose of existing turf anchor curb and track drain within limits shown 
o Remove and salvage existing storm drainage piping and supplement as needed 
o Excavate and remove existing soils to a depth of approximately 5’ along the entirety of the 
facility and up 10’ in various areas to remove unsuitable soils 
o Provided shoring and safety measures around existing structures, such as light poles, bleachers, 
sheds, etc… 
o Town provided 3rd party field testing agency for full time inspection of installed materials 
o Furnish and install new subgrade materials, compact in lifts to geotechnical recommendations 
o Furnish and install geogrid support mesh in 2 layers 
o Install drainage piping  
o Furnish and install electrical conduits and electrical system 
o Furnish and install new ACO drain and concrete turf anchor curb 
o Reinstall construct track base with appropriate base materials 
o Pave new track system to a depth of 3.5” of pavement with virgin asphalt 
o Furnish and install new dynamic stone base for field system 
o Furnish and install new track surfacing and striping within limits shown 
o Furnish and install new synthetic turf within limits shown 
o Furnish and install new 4’ ht. chain link fencing 
o Furnish and install new paved access around field 
 
➢ Synthetic Turf Installation   
• Remove and recycle existing synthetic turf carpet and infill 
• Furnish and install post tension concrete field base 
• Furnish and install synthetic turf for field 
• Synthetic turf with SBR rubber and sand infill  
 
 

Page 90

  
 
PROJECT BUDGET 
 
• Colored end zone 
• Alternating turf panels 
• Post installation GMAX field testing 
 
➢ End Zone Letters  
• “GRANBY” end zone lettering 
 
 
➢ Midfield Logo  
• Midfield Grizzly Style Logo 
 
 
➢ Track Base Reconstruction  
• Remove and dispose of existing rubberized track surface 
• Furnish and install post tension concrete track base 
o Match grades to existing perimeter trench drain which is to remain 
 
 
➢ Track Surfacing BSS-300  
• Supply and install Beynon BSS-300 polyurethane track surfacing 
o Base color: Beynon red 
• Perform track striping 
 
 
➢ Colored Exchange Zones  
• (3) colored exchange zones  
 
 
ADDITIONAL SITE IMPROVEMENTS 
 
➢ 20’ Height Ball Safety Netting  $80,000 - $95,000 
• Supply and install 20-foot-high ball safety netting in D-Zones, including 
foundations, sleeves, poles, netting, and hardware along the field end lines 
 
 
➢ 10’ Height Ball Safety Netting $55,000 - $75,000 
• Supply and install 10-foot-high ball safety netting in corners of field up to 20 yard 
line, including foundations, sleeves, poles, netting, and hardware along the field 
end lines 
 
 
➢ Press Box                                                    $175,000 - $225,000 
• Furnish and install new press box behind existing bleachers 
• Includes new foundation and support structure 
• ADA access lift listed as separate item if needed 
 
 
➢ ADA Lift $95,000 - $125,000 
• Furnish and install new ADA accessible lift to press box 
• Includes foundation and installation 
 
 
➢ Retrofit of Existing Athletic Lighting     $200,000 - $250,000 

Page 91

  
 
PROJECT BUDGET 
 
• Remove and dispose of existing light fixtures and replace with LED fixtures 
• Poles to remain 
 
 
➢ New Bleachers with Press Box  $650,000 - $750,000 
• Furnish and install new double sided bleachers to service both fields (+/- 400 
seats) 
• Furnish and install press box between fields for use for both fields 
• Furnish and install concrete slab for bleachers 
• Provide power supply 
 
 
POTENTIAL TOTAL OF OPTION 1 w/ ALL ALTERANTES                                                            $ 10,625,000 - $ 12,600,000 
 
EXCLUSIONS 
➢ Any costs associated with necessary charges relating to the delineation of the field 
➢ The supply of manholes or clean-outs or grates, or supply of the manhole covers 
➢ Any alteration or deviation from specifications involving extra costs, which alteration or deviation will be 
provided only upon executed change orders, and will become an extra charge over and above the offered 
price 
➢ Soil stabilization or remediation of any type beyond 5’ depth 
➢ Rock excavation and/or ledge removal 
➢ Offsite disposal of generated spoils Excavation or disposal of unsuitable or contaminated soils 
➢ Site security  
➢ Once subgrade has been established, a proof roll will be performed to ensure structural stability of the soils; 
in the event that unsuitable soils are encountered, a price to remedy these areas can be negotiated based 
on recommended methods per project Engineer 
➢ 3rd party testing or Inspection Fees 
➢ Site restoration, sodding, landscaping or grow-in beyond disturbed areas 
➢ Repair or resurfacing existing asphalt parking lot if damaged by truck traffic 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Page 92

  
 
PROJECT BUDGET 
 
➢ Option 2 (FieldTurf Preferred Option) $5,150,000 - $5,500,000 
• General Scope: Extensive Exploration and Solidify 
o GPS located major sink hole areas and record for future exploration use 
o Remove and dispose of existing track surfacing  
o Remove and dispose of existing synthetic turf surfacing 
o Full depth mill of existing track pavement and remove 
o Excavate, remove and salvage existing field stone base and processed aggregate track base as 
necessary 
o Remove and dispose of existing turf anchor curb around track and field 
o Remove and replace football goal posts  
o Remove and replace damaged sections of drainage piping 
o Remove and dispose of existing electrical conduit and wiring if encountered during exploration 
o Replace and/or reset electrical boxes and drainage structures within field 
o Conduct a series of 10’ deep x 2’ diameter augur holes along eastern side of track / field 
o Remove and dispose of excavated material 
o Install flowable fill in all excavated holes to a depth of approximately 1’ below finished grade 
o Furnish and install geogrid support mesh prior to backfill 
o Furnish and install new subgrade materials to achieve new grades 
o Reinstall drainage piping and electrical conduits as necessary 
o Furnish and install new ACO drain and concrete turf anchor curb as required 
o Furnish and install new post tension concrete track and field 
o Furnish and install new 4’ ht. chain link fencing and gates 
o Furnish and install new access path around field 
o Furnish and install new track surfacing and striping within limits shown 
o Furnish and install new synthetic turf and shock/drainage pad within limits shown 
o Provide 25+ year structural warranty on all post tension concrete 
 
 
➢ Synthetic Turf Installation   
• Remove and recycle existing synthetic turf carpet and infill 
• Furnish and install post tension concrete field base 
• Furnish and install shock / drainage pad 
• Furnish and install synthetic turf for field 
• Synthetic turf with SBR rubber and sand infill  
• Colored end zone 
• Alternating turf panels 
• Post installation GMAX field testing 
• Annual field maintenance. 1 visit per year for 8 years 
 
 
➢ End Zone Letters  
• “GRANBY” end zone lettering 
 
 
➢ Midfield Logo  
• Midfield Grizzly Style Logo 
 
 
 
 
 

Page 93

  
 
PROJECT BUDGET 
 
➢ Track Base Reconstruction  
• Remove and dispose of existing rubberized track surface 
• Furnish and install post tension concrete track base 
o Match grades to existing perimeter trench drain which is to remain 
 
 
➢ Track Surfacing BSS-300  
• Supply and install Beynon BSS-300 polyurethane track surfacing 
o Base color: Beynon red 
• Perform track striping 
 
 
➢ Colored Exchange Zones  
• (3) colored exchange zones  
 
ADDITIONAL SITE IMPROVEMENTS 
➢ 20’ Height Ball Safety Netting  $80,000 - $95,000 
• Supply and install 20-foot-high ball safety netting in D-Zones, including foundations, 
sleeves, poles, netting, and hardware along the field end lines 
 
 
➢ 10’ Height Ball Safety Netting $55,000 - $75,000 
• Supply and install 10-foot-high ball safety netting in corners of field up to 20 yard line, 
including foundations, sleeves, poles, netting, and hardware along the field end lines 
 
 
➢ Press Box                                                         $175,000 - $225,000 
• Furnish and install new press box behind existing bleachers 
• Includes new foundation and support structure 
• ADA access lift listed as separate item if needed 
 
 
➢ ADA Lift       $95,000 - $125,000 
• Furnish and install new ADA accessible lift to press box 
• Includes foundation and installation 
 
 
➢ Retrofit of Existing Athletic Lighting     $200,000 - $250,000 
• Remove and dispose of existing light fixtures and replace with LED fixtures 
• Poles to remain 
 
 
➢ New Bleachers with Press Box  $650,000 - $750,000 
• Furnish and install new double sided bleachers to service both fields (+/- 400 seats) 
• Furnish and install press box between fields for use for both fields 
• Furnish and install concrete slab for  bleachers 
• Provide power supply 
 
 
          POTENTIAL TOTAL OF OPTION 1 w/ ALL ALTERANTES                                                            $ 6,475,000 - $ 7,100,000 
 

Page 94

  
 
PROJECT BUDGET 
 
EXCLUSIONS 
➢ Any costs associated with necessary charges 
relating to the delineation of the field 
➢ The supply of manholes or clean-outs or grates, 
or supply of the manhole covers 
➢ Any alteration or deviation from specifications 
involving extra costs, which alteration or 
deviation will be provided only upon executed 
change orders, and will become an extra charge 
over and above the offered price 
➢ Soil stabilization or remediation of any type 
➢ Mass Excavation as required to achieve 
subgrade  
➢ Rock excavation 
➢ Offsite disposal of generated spoils  
➢ Excavation or disposal of unsuitable or 
contaminated soils 
➢ Site security  
➢ Once subgrade has been established, a proof 
roll will be performed to ensure structural 
stability of the soils; in the event that unsuitable 
soils are encountered, a price to remedy these 
areas can be negotiated based on 
recommended methods per project Engineer 
➢ Testing or Inspection Fees 
➢ Site restoration, sodding, landscaping or grow-
in beyond disturbed areas 
➢ Repair or resurfacing existing asphalt parking 
lot if damaged by truck traffic 
➢ Bond fees and non-local permits 
 
 
Please feel free to reach out to any member of our project team with questions about our offer: 
 
Andrew Dyjak 
Regional Vice President 
(860) 333-7839 
Andrew.Dyjak@Fieldturf.com
 
  
Chris Hulk 
Regional Vice President 
203-676-4445 
christopher.hulk@fieldturf.com  
 
 
 
Jonathan Luster, PE 
Regional Construction Manager 
(860) 227-4915 
Jonathan.Luster@FieldTurf.com 
 

Page 95

  
 
PROJECT PROPOSAL 
 
    GRANBY FIELD RENOVATIONS   Nov. 24, 2025 
 
   
 
Prepared For:  Christopher DeGray, Director of Facilities – Granby Public Schools             
Prepared By:  Andrew Dyjak – Regional Vice President, New England 
  Chris Hulk, PE – Regional Vice President, New England 
Address: Granby Memorial High School| 54 N Granby Rd, Granby, CT 06035 
PRICING SUMMARY 
 
Pricing has been provided as a summary of the full proposals. Pricing listed excludes alternates. Please see 
full proposals for additional pricing items.  
 
     BASE BID 
FIELD NAME Granby High School Track and Field 
SQUARE FOOTAGE +/- 93,500 s.f. 
PRODUCT  FieldTurf Vertex Prime 
FIELD MARKINGS Football, Soccer, Lacrosse and Field Hockey  
TOTAL PRICE $ 5,348,500.00 
 
     BASE BID 
FIELD NAME Granby High School Field 2 
SQUARE FOOTAGE +/- 83,000 s.f. 
PRODUCT  FieldTurf Vertex Prime 
FIELD MARKINGS Soccer, Lacrosse and Field Hockey  
TOTAL PRICE $ 665,750.00 
 
   MULTI-FIELD DISCOUNT 
FIELD NAME Granby High School 
Credit is both fields completed concurrently ($ 125,000.00) 
 
   COMBINED PROJECTS BASE BID (Excludes Alternates) 
FIELD NAME Granby High School Track, Field and Field 2 Combined 
SQUARE FOOTAGE +/- 176,500 SF 
TOTAL PRICE $ 5,889,250.00 

Page 96

  
 
PROJECT PROPOSAL 
 
GRANBY MEMORIAL HIGH SCHOOL   
TRACK & FIELD IMPROVEMENTS  
                
                     
 
 
 
 
 
 
 
 
                          Existing Conditions Aerial 
 
 
 
 
Conceptual Layout  
 
Date:  November 26, 2025 
Prepared For:  Christopher DeGray, Director of Facilities – Granby Public Schools              
Prepared By:  Andrew Dyjak – Regional Vice President, New England 
  Chris Hulk, PE – Regional Vice President, New England 
  Jonathan Luster, PE – Regional Construction Manager, New England 
Address: Granby Memorial High School| 54 N Granby Rd, Granby, CT 06035 
 
This proposal encompasses all facets of the project, with FieldTurf offering a comprehensive, turnkey solution that 
includes design, project oversight, and construction. The proposal is based on current site conditions, review meeting 
with the school, and the planned construction period in spring/summer 2026.  
FieldTurf USA, Inc. is pleased to present the following proposal.  FieldTurf pricing is based on the Capital Region Education 
Council (CREC) program. CREC is a member of The Association of Educational Purchasing Agencies (AEPA) program. The 
AEPA is a purchasing co-op that provides member schools with pre-determined preferential pricing by approved vendors. 
Since the product has already been bid at the national level, individual schools do not have to duplicate the formal bid 
process. AEPA IFB #024-A. 
 
Click on the following AEPA hyperlink for more information:  AEPA IFB #24-A. 
 
Below is a detailed cost breakdown for site construction, turf installation and overall implementation of the project. 
 
 

Page 97

  
 
PROJECT PROPOSAL 
 
     BASE BID  
FIELD NAME Granby High School Track and Field 
SQUARE FOOTAGE +/- 93,500 s.f. 
PRODUCT  FieldTurf Vertex Prime 
FIELD MARKINGS Football, Soccer, Lacrosse and Field Hockey  
TOTAL PRICE $ 5,348,500.00 
 
Project Description: 
The existing track and field at Granby Memorial High School is in need of significant remediation due to sinks holes that 
have developed along the track / field. Based on the original geotechnical information provided by the Town, it appears 
that organic material has decayed below the eastern side of the track / field. The depths of this material are present up 
to 10’ below existing grade. The Town then expanded the geotechnical investigation. The new report indicated the 
entirety of the track and field area should be fully removed down to a depth of 5’ and the compacted back in lifts. The 
cost for reconstruction in the manner indicated by the geotechnical report was well beyond the available funds. This led 
to the option of post tension concrete track and field that FieldTurf is proposing.  
 
FieldTurf proposes to reconstruct the existing track and field areas with post tension concrete. FieldTurf has completed 
both post tension tracks and post tension fields throughout the New England region and through out the country. This 
technology allows the majority of materials to stay in place and be bridged by the nature of how post tension concrete 
operates. Slabs of post tension concrete are designed to span areas of unsuitable soils, provide high strength and long 
lasting base for the application. Many other types of construction use this technique for bridges, parking garage slabs, 
balconies, overhangs and other types of applications. Another major benefit is that FieldTurf, as part of Tarkett Sports, is 
able to provide a 25+ year warranty on the structural components of the installation. This means that the Town would 
be assured of the performance and stability of the track and field. The reconstruction efforts of this type of system 
would remove the track and field areas. Remove the top 4”-5” of materials, compact the existing subgrade, perform 20-
30 augured holes in areas of known settlement, install flowable fill in those areas and then construct a new post tension 
concrete track and field. Improved drainage, ball netting sleeves and football goal posts would be installed. Fencing 
would be replaced and walkway areas around the track would be renovated to meet new grades. All surrounding site 
features including lights, bleachers, buildings, scoreboards can all remain in place without the need for additional 
shoring or replacement. 
 
Alternates have been included for site improvements such as LED lighting renovation, press box, ball netting, etc. 
 
Depending on final scope options, the project is anticipated to be constructed in a ±4-5 month timeframe. It is also 
anticipated that access and staging areas will be available in the adjacent parking lot. Additional discussions, review and 
programming will be required to finalize the scope, timing and alternates prior to construction.   
 

Page 98

  
 
PROJECT PROPOSAL 
 
TRACK AND FIELD RENVOATION IMPROVEMENTS 
• General Scope: Post Tension concrete track and field 
o GPS located major sink hole areas and record for future exploration use 
o Remove and dispose of existing track surfacing  
o Remove and dispose of existing synthetic turf surfacing 
o Full depth mill of existing track pavement and remove 
o Excavate, remove and salvage existing field stone base and processed aggregate track base as 
necessary 
o Remove and dispose of existing turf anchor curb around track and field 
o Remove and replace football goal posts  
o Remove and replace damaged sections of drainage piping 
o Remove and dispose of existing electrical conduit and wiring if encountered during exploration 
o Replace and/or reset electrical boxes and drainage structures within field 
o Conduct a series of 10’ deep x 18” diameter augur holes along eastern side of track / field 
o Remove and dispose of excavated material 
o Install flowable fill in all excavated holes to a depth of approximately 1’ below finished grade 
o Furnish and install geogrid support mesh prior to backfill 
o Furnish and install new subgrade materials to achieve new grades 
o Reinstall drainage piping and electrical conduits as necessary 
o Furnish and install new ACO drain and concrete turf anchor curb as required 
o Furnish and install new post tension concrete track and field 
o Furnish and install new 4’ ht. chain link fencing and gates 
o Furnish and install new access path around field 
o Furnish and install new track surfacing and striping within limits shown 
o Furnish and install new synthetic turf and shock/drainage pad within limits shown 
o Provide 25+ year structural warranty on all post tension concrete 
 
 
➢ Synthetic Turf Installation   
• Remove and recycle existing synthetic turf carpet and infill 
• Furnish and install post tension concrete field base 
• Furnish and install shock / drainage pad 
• Furnish and install synthetic turf for field 
• Synthetic turf with SBR rubber and sand infill  
• Colored end zone 
• Alternating turf panels 
• Post installation GMAX field testing 
• Annual field maintenance. 1 visit per year for 8 years 
 
 
➢ End Zone Letters  
• “GRANBY” end zone lettering 
 
 
➢ Midfield Logo  
• Midfield Grizzly Style Logo 
 
 
 
 
 

Page 99

  
 
PROJECT PROPOSAL 
 
➢ Track Base Reconstruction  
• Remove and dispose of existing rubberized track surface 
• Furnish and install post tension concrete track base 
o Match grades to existing perimeter trench drain which is to remain 
 
 
➢ Track Surfacing BSS-300  
• Supply and install Beynon BSS-300 polyurethane track surfacing 
o Base color: Beynon red 
o (3) Colored exchange zones. Color: Gray 
• Perform track striping 
 
 
ALTERNATES: 
➢ Performance and Payment Bonds  $67,000.00 
• Supply performance and payment bonds 
 
 
➢ 20’ Height Ball Safety Netting  $81,000.00 
• Supply and install 20-foot-high ball safety netting in D-Zones, including foundations, 
sleeves, poles, netting, and hardware along the field end lines 
 
 
➢ 10’ Height Ball Safety Netting $65,000.00 
• Supply and install 10-foot-high ball safety netting in corners of field up to 20 yard line, 
including foundations, sleeves, poles, netting, and hardware along the field end lines 
 
 
➢ Press Box                                                                         $215,000.00 
• Furnish and install new press box behind existing bleachers 
• Includes new foundation and support structure 
• ADA access lift listed as separate item if needed 
 
 
➢ ADA Lift                        $85,000.00 
• Furnish and install new ADA accessible lift to press box 
• Includes foundation and installation 
• Required if press box is more than 500 s.f. or has two points of entry 
 
 
➢ Retrofit of Existing Athletic Lighting     $255,000.00 
• Remove and dispose of existing light fixtures and replace with LED fixtures 
• Assumed 40 fc system 
• Poles to remain 
 
 
➢ New Bleachers with Press Box  $715,000.00 
• Furnish and install new double sided bleachers to service both fields (+/- 400 seats) 
• Furnish and install press box between fields for use for both fields 
• Furnish and install concrete slab for  bleachers 
• Provide power supply 
 
 

Page 100

  
 
PROJECT PROPOSAL 
 
EXCLUSIONS 
➢ Any costs associated with necessary charges 
relating to the delineation of the field 
➢ The supply of manholes or clean-outs or grates, 
or supply of the manhole covers 
➢ Any alteration or deviation from specifications 
involving extra costs, which alteration or 
deviation will be provided only upon executed 
change orders, and will become an extra charge 
over and above the offered price 
➢ Soil stabilization or remediation of any type 
➢ Mass Excavation as required to achieve 
subgrade  
➢ Rock excavation 
➢ Offsite disposal of generated spoils  
➢ Excavation or disposal of unsuitable or 
contaminated soils 
➢ Site security  
➢ Once subgrade has been established, a proof 
roll will be performed to ensure structural 
stability of the soils; in the event that unsuitable 
soils are encountered, a price to remedy these 
areas can be negotiated based on 
recommended methods per project Engineer 
➢ Testing or Inspection Fees 
➢ Site restoration, sodding, landscaping or grow-
in beyond disturbed areas 
➢ Repair or resurfacing existing asphalt parking 
lot if damaged by truck traffic 
➢ Bond fees and non-local permits 
 
 
Please feel free to reach out to any member of our project team with questions about our offer: 
 
Andrew Dyjak 
Regional Vice President 
(860) 333-7839 
Andrew.Dyjak@Fieldturf.com
 
  
Chris Hulk 
Regional Vice President 
203-676-4445 
christopher.hulk@fieldturf.com  
 
 
 
Jonathan Luster, PE 
Regional Construction Manager 
(860) 227-4915 
Jonathan.Luster@FieldTurf.com 
Thank you again for your interest in FieldTurf, we look forward to working with you. 
                         
Per:     
Marie-Christine Raymond, Director of Operations 
FieldTurf USA, Inc. / Tarkett Sports Canada, Inc. 
 
FieldTurf USA, Inc. holds the Cooperative Purchase contract, any PO for Contract must be made out to 
FieldTurf USA, Inc. 175 N Industrial Blvd NE. Calhoun, GA 30701 
If you have questions regarding the FieldTurf and Beynon SmartBuy Cooperative Purchasing Program, 
please contact Eric Fisher at:  Eric.Fisher@smartbuycooperative.com. 
 

Page 101

  
 
PROJECT PROPOSAL 
 
a) This bid proposal and its acceptance is subject to 
strikes, accidents, delays beyond our control and 
force majeure. 
b) FieldTurf’s preferred payment terms are as 
follows: (i) 50% of the Price upon Customer’s 
execution of contract; (ii) 40% of the Price upon 
shipment of materials from FieldTurf’s 
manufacturing facility; and (iii) Remaining balance 
of ten percent (10%) upon substantial completion 
of the field, which shall be achieved when 
Customer is able to use the field for its intended 
purpose, even if punchlist items remain and the 
Certificate of Completion has not been executed 
by Customer.  
c) Accounts overdue beyond 30 days of invoice  
date will be charged at an interest rate of 10%  
per annum. 
d) FieldTurf requires a minimum of 21 days after 
receiving a fully executed contract or purchase 
order and final approvals on shop drawings to 
manufacture, coordinate delivery and schedule 
arrival of installation crew. Under typical field size 
and scenario, FieldTurf further requires a minimum 
of 28 days per field to install the Product subject to 
weather and force majeure 
 
e) FieldTurf requires a suitable staging area. Staging is 
anticipated in the last row of parking in the adjacent 
parking lot.  minimum access of 15 feet wide by 15 
feet high, and, no more than 100 ft from the site. A 
25 foot wide by 25 foot long hard or paved clean 
surface area located within 50 feet of the playing 
surface shall be provided for purposes of proper 
CONDITIONS 
Notwithstanding any other document or agreement entered into by FieldTurf in connection with the 
supply and installation only of its product pursuant to the present bid proposal, the following shall 
apply:
 
 
 
 
mixing of infill material. Access to any field will include 
suitable bridging over curbs from the staging area to 
permit suitable access to the field by low clearance 
vehicles. Staging area surface shall be suitable for 
passage with motor vehicles used to transport 
materials to the site and/or staging area. FieldTurf 
shall not be liable for any damages to the staging 
area or its surface unless such damages are caused 
by FieldTurf’s intentional misconduct or negligence. 
f) This proposal is based on a single mobilization. If 
the site is not ready and additional mobilizations 
are necessary, additional charges will apply. 
g) Upon substantial completion of FieldTurf’s 
obligations, the Customer shall sign FieldTurf’s 
Certificate of Completion in the form currently in 
force; to accomplish this purpose, the Customer will 
ensure that an authorized representative is present 
at the walk-through to determine substantial 
completion and acceptance of the field, which may 
include a list of punch list items. 
h) FieldTurf shall not be a party to any penalty clauses 
and/or liquidated damages provisions. 
i) FieldTurf shall be entitled to recover all costs and 
expenses, including attorney fees, associated with 
collection procedures in the event that FieldTurf 
pursues collection of payment of any past  
due invoice. 
j) All colors are to be chosen from FieldTurf’s 
standard colors. 
 
THE TARKETT SPORTS FAMILY - LEADERS IN SPORTS SURFACING 
6/6 

Page 102

G R A N B Y
G R A N B Y
0'15'60'
SCALE: 1"=30''
30'
GRANBY MEMORIAL HIGH SCHOOL
TRACK & FIELD
39 SCHOOL STREET
GRANBY, CONNECTICUTACHUSETTSAPRIL 15, 2025
TRACK & FIELD
Drawing: C:\USERS\T017224\ONEDRIVE - TARKETT\US09 - TEAM - ESTIMATING - DOCUMENTS\2024 BID ACTIVITY\CONNECTICUT\GRANBY\GRANBY HS CONCEPTS FINAL.DWG Layout Tab:TRACKPlotted by: T017224    On this date: Wed, 2025 November 26 - 2:12pm
ALTERNATE: FURNISH AND INSTALL NEW
PRESS BOX AND LIFT
POST TENSION CONCRETE TRACK AND FIELD
NOTES:
1)ALL DESIGN AND EXISTING CONDITIONS MAPPING BASED
ON AVAILABLE MAPPING AND SHOULD BE CONSIDERED
APPROXIMATE.
2)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA
AND REQUIRES A CERTIFIED FIELDTURF INSTALLER AND
BUILDER TO IMPLEMENT THE PROPOSED CONDITIONS.
3)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA
AND NO ATTEMPTS SHALL BE MADE TO DUPLICATE OR
REPLICATE WITHOUT THE PREMISSION OF FIELDTURF.
ALTERNATE:
FULLY PROGRAMMABLE
SCOREBOARD
NEW GATES AT KEY LOCATIONS
REMOVE AND REPLACE TRACK
SURFACING WITH BSS-300 WITH
GRAY EXCHANGE ZONES
REMOVE AND REPLACE
SYNTHETIC TURF
ALTERNATE:
DUAL SIDED BLEACHERS WITH PRESS BOX
ALTERNATE:
RETROFIT EXISTING LIGHTING SYSTEM TO
BE LED
ALTERNATE: 20' BALL SAFETY NETTING
SYSTEM
ALTERNATE: 10' BALL SAFETY NETTING
SYSTEM ALONG CORNERS

Page 103

  
 
PROJECT PROPOSAL 
 
GRANBY MEMORIAL HIGH SCHOOL   
FIELD 2 IMPROVEMENTS  
                
                     
 
 
 
 
 
 
 
 
                          Existing Conditions Aerial 
 
 
 
 
Conceptual Layout  
 
Date:  November 25, 2025 
Prepared For:  Christopher DeGray, Director of Facilities – Granby Public Schools              
Prepared By:  Andrew Dyjak – Regional Vice President, New England 
  Chris Hulk, PE – Regional Vice President, New England 
  Jonathan Luster, PE – Regional Construction Manager, New England 
Address: Granby Memorial High School| 54 N Granby Rd, Granby, CT 06035 
 
This project proposal encompasses all facets of the project, with FieldTurf offering a comprehensive, turnkey solution 
that includes design, project oversight, and construction. The project is based on current site conditions, review meeting 
with the school, and the planned construction period in spring/summer 2026.  
FieldTurf pricing is based on the Capital Region Education Council (CREC) program. CREC is a member of The Association 
of Educational Purchasing Agencies (AEPA) program. The AEPA is a purchasing co-op that provides member schools with 
pre-determined preferential pricing by approved vendors. Since the product has already been bid at the national level, 
individual schools do not have to duplicate the formal bid process. AEPA IFB #024-A.  
 
 
      Click on the following AEPA hyperlink for more information:  AEPA IFB #24-A. 
 
Below is a detailed cost breakdown for site construction, turf installation and overall implementation of the project. 
 
 

Page 104

  
 
PROJECT PROPOSAL 
 
BASE BID  
FIELD NAME Granby High School Field 2 
SQUARE FOOTAGE +/- 83,000 s.f. 
PRODUCT  FieldTurf Vertex Prime 
FIELD MARKINGS Soccer, Lacrosse and Field Hockey  
TOTAL PRICE $ 665,750.00 
 
Project Description: 
The project proposes to replace the existing synthetic turf carpet with new synthetic turf. The existing turf will be cut 
into sections, rolled up, and removed from the field. The existing infill will BE removed from the field and brought to a 
recycling facility. The field will then be laser graded to achieve planarity before the new turf is laid down and installed on 
the field. If additional topping stone is needed to achieve planarity, more stone will be brought in. Various alternates 
have been included for considerations such as center logo, new LED lighting pole and fixtures, ball safety netting, and 
walkways have been added to the project below as well.  
Depending on final scope, the project is anticipated to be constructed in a ±2-3 month timeframe. It is also anticipated 
that access and staging areas will be available nearby. This project is intended to assist the school in preparing for this 
project. Additional discussions, review and programming will be required to refine the scope and project prior to 
construction.  
SYNTHETIC TURF IMPROVEMENTS 
➢ Synthetic Turf Installation   
• Remove And Recycle Existing Synthetic Turf Carpet And Infill 
• Laser Grade Base Stone And Supplement Base Stone As Needed In Order To Achieve 
Planarity Prior To Turf Installation 
• Furnish And Install Synthetic Turf For Field 
• Synthetic Turf With SBR Rubber And Sand Infill  
• Colors And Logos Per Rendering 
• Post Installation GMAX Field Testing 
 
 
 
 
 

Page 105

  
 
PROJECT PROPOSAL 
 
ALTERNATES: 
➢ Alternate: Performance and Payment Bonds                                       $8,300.00 
o Supply performance and payment bonds 
 
➢ Alternate: Midfield Logo                                                   $15,000.00 
o Midfield “Grizzly” style Bear logo  
 
➢ Alternate: Improved Ball Netting                                         $78,000.00 
o Remove Existing Ball Netting 
o Furnish And Install New Ball Netting 
o Final Size And Location T.B.D. 
 
➢ Alternate: New Scoreboard                                         $85,000.00 
o Furnish And Install Multi-Use Scoreboard 
o Assumed Programmable Boards with Display/Naming Panel Above Board 
o Scoreboard (8’h X 25’w) 
 
➢ Alternate 5: New Led Lighting Fixtures                                     $525,500.00 
o Furnish And Install New Led Light Fixtures On Existing Poles 
o Assumed 4 Pole System 
o New Power Supply Within 100’ Of Field 
EXCLUSIONS 
➢ Any costs associated with necessary charges 
relating to the delineation of the field 
➢ The supply of manholes or clean-outs or grates, 
or supply of the manhole covers 
➢ Any alteration or deviation from specifications 
involving extra costs, which alteration or 
deviation will be provided only upon executed 
change orders, and will become an extra charge 
over and above the offered price 
➢ Soil stabilization or remediation of any type 
➢ Mass Excavation as required to achieve 
subgrade  
➢ Rock excavation 
➢ Offsite disposal of generated spoils  
➢ Excavation or disposal of unsuitable or 
contaminated soils 
➢ Site security  
➢ Once subgrade has been established, a proof 
roll will be performed to ensure structural 
stability of the soils; in the event that unsuitable 
soils are encountered, a price to remedy these 
areas can be negotiated based on 
recommended methods per project Engineer 
➢ Testing or Inspection Fees 
➢ Site restoration, sodding, landscaping or grow-
in beyond disturbed areas 
➢ Repair or resurfacing existing asphalt parking 
lot if damaged by truck traffic 
➢ Bond fees and non-local permits 
 
Please feel free to reach out to any member of our project team with questions about our offer: 
 
Andrew Dyjak 
Regional Vice President 
(860) 333-7839 
Andrew.Dyjak@Fieldturf.com
 
  
Chris Hulk 
Regional Vice President 
203-676-4445 
christopher.hulk@fieldturf.com  
 
 
Jonathan Luster, PE 
Regional Construction Manager 
(860) 227-4915 
Jonathan.Luster@FieldTurf.com 

Page 106

  
 
PROJECT PROPOSAL 
 
Thank you again for your interest in FieldTurf, we look forward to working with you. 
                         
Per:     
Marie-Christine Raymond, Director of Operations 
FieldTurf USA, Inc. / Tarkett Sports Canada, Inc. 
 
FieldTurf USA, Inc. holds the Cooperative Purchase contract, any PO for Contract must be made out to 
FieldTurf USA, Inc. 175 N Industrial Blvd NE. Calhoun, GA 30701 
If you have questions regarding the FieldTurf and Beynon SmartBuy Cooperative Purchasing Program, 
please contact Eric Fisher at:  Eric.Fisher@smartbuycooperative.com. 
 

Page 107

  
 
PROJECT PROPOSAL 
 
a) This bid proposal and its acceptance is subject to 
strikes, accidents, delays beyond our control and 
force majeure. 
b) FieldTurf’s preferred payment terms are as 
follows: (i) 50% of the Price upon Customer’s 
execution of contract; (ii) 40% of the Price upon 
shipment of materials from FieldTurf’s 
manufacturing facility; and (iii) Remaining balance 
of ten percent (10%) upon substantial completion 
of the field, which shall be achieved when 
Customer is able to use the field for its intended 
purpose, even if punchlist items remain and the 
Certificate of Completion has not been executed 
by Customer.  
c) Accounts overdue beyond 30 days of invoice  
date will be charged at an interest rate of 10%  
per annum. 
d) FieldTurf requires a minimum of 21 days after 
receiving a fully executed contract or purchase 
order and final approvals on shop drawings to 
manufacture, coordinate delivery and schedule 
arrival of installation crew. Under typical field size 
and scenario, FieldTurf further requires a minimum 
of 28 days per field to install the Product subject to 
weather and force majeure 
 
e) FieldTurf requires a suitable staging area. Staging is 
anticipated in the last row of parking in the adjacent 
parking lot.  minimum access of 15 feet wide by 15 
feet high, and, no more than 100 ft from the site. A 
25 foot wide by 25 foot long hard or paved clean 
surface area located within 50 feet of the playing 
surface shall be provided for purposes of proper 
CONDITIONS 
Notwithstanding any other document or agreement entered into by FieldTurf in connection with the 
supply and installation only of its product pursuant to the present bid proposal, the following shall 
apply:
 
 
 
mixing of infill material. Access to any field will include 
suitable bridging over curbs from the staging area to 
permit suitable access to the field by low clearance 
vehicles. Staging area surface shall be suitable for 
passage with motor vehicles used to transport 
materials to the site and/or staging area. FieldTurf 
shall not be liable for any damages to the staging 
area or its surface unless such damages are caused 
by FieldTurf’s intentional misconduct or negligence. 
f) This proposal is based on a single mobilization. If 
the site is not ready and additional mobilizations 
are necessary, additional charges will apply. 
g) Upon substantial completion of FieldTurf’s 
obligations, the Customer shall sign FieldTurf’s 
Certificate of Completion in the form currently in 
force; to accomplish this purpose, the Customer will 
ensure that an authorized representative is present 
at the walk-through to determine substantial 
completion and acceptance of the field, which may 
include a list of punch list items. 
h) FieldTurf shall not be a party to any penalty clauses 
and/or liquidated damages provisions. 
i) FieldTurf shall be entitled to recover all costs and 
expenses, including attorney fees, associated with 
collection procedures in the event that FieldTurf 
pursues collection of payment of any past  
due invoice. 
j) All colors are to be chosen from FieldTurf’s 
standard colors. 
 
THE TARKETT SPORTS FAMILY - LEADERS IN SPORTS SURFACING 
6/6 

Page 108

0'10'20'
SCALE: 1"=20'
40'
GRANBY MEMORIAL HIGH SCHOOL
FIELD 2
39 SCHOOL STREET
GRANBY, CONNECTICUTACHUSETTSAPRIL 15, 2025
FIELD 2
Drawing: C:\USERS\T017224\ONEDRIVE - TARKETT\US09 - TEAM - ESTIMATING - DOCUMENTS\2024 BID ACTIVITY\CONNECTICUT\GRANBY\GRANBY HS CONCEPTS FINAL.DWG Layout Tab:FIELD 2Plotted by: T017224    On this date: Wed, 2025 November 26 - 2:08pm
NOTES:
1)ALL DESIGN AND EXISTING CONDITIONS MAPPING BASED
ON AVAILABLE MAPPING AND SHOULD BE CONSIDERED
APPROXIMATE.
2)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA
AND REQUIRES A CERTIFIED FIELDTURF INSTALLER AND
BUILDER TO IMPLEMENT THE PROPOSED CONDITIONS.
3)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA
AND NO ATTEMPTS SHALL BE MADE TO DUPLICATE OR
REPLICATE WITHOUT THE PREMISSION OF FIELDTURF.
ALTERNATE:
FULLY PROGRAMMABLE
SCOREBOARD
REMOVE AND REPLACE
SYNTHETIC TURF
ALTERNATE:
DUAL SIDED BLEACHERS WITH
PRESS BOX
ALTERNATE:
NEW LED FIELD LIGHTING SYSTEM
ALTERNATE:
BALL SAFETY NETTING SYSTEM
ALTERNATE:
IMPROVED FIELD ACCESS

Page 109

  
 
PROJECT BUDGET 
 
GRANBY MEMORIAL HIGH SCHOOL   
ATHLETIC FACILITY IMPROVEMENTS 
 
                
                     
Date:  April 21, 2025 
Prepared For:  Karl Gates - Athletic Director & Student Activities Coordinator              
Prepared By:  Andrew Dyjak – Regional Vice President, New England 
  Chris Hulk, PE – Regional Vice President, New England 
  Jonathan Luster, PE – Regional Construction Manager, New England 
Address: Granby Memorial High School| 54 N Granby Rd, Granby, CT 06035 
 
FieldTurf pricing is based on the Capital Region Education Council (CREC) program. CREC is a member of The Association 
of Educational Purchasing Agencies (AEPA) program. The AEPA is a purchasing co-op that provides member schools with 
pre-determined preferential pricing by approved vendors. Since the product has already been bid at the national level, 
individual schools do not have to duplicate the formal bid process. AEPA IFB #024.  
 
 
      Click on the following AEPA hyperlink for more information:  AEPA IFB #24 
 
Master Review Approach: 
FieldTurf has reviewed each site on the campus with School and Town staff to review both existing conditions and future 
development desires. Through this process FieldTurf has become familiar with the needs and wants of the School to best 
serve the School and Town moving forward. The recommendations that are proposed below are based on hundreds of 
Connecticut installations, the design build approach that has become the preferred procurement method of many 
municipalities in the New England area and by in house professional engineering staff design. 
 
A conceptual layout plan has been developed for each site with associated budgets. These budgets are subject to change 
and be altered upon further refinement of scope between FieldTurf and the School/Town. FieldTurf will help develop 
the final scope of the project, then develop professionally engineered plans tailored to each site and finally assist the 
School/Town with obtaining permits.  
 
FieldTurf is part of Tarkett Sports and has become the industry leader in synthetic turf, design build and athletic facility 
development. Through Tarkett Sports we have in house post tension concrete court division, synthetic track divisions, 
synthetic turf divisions, long term care divisions and partnerships with various lighting companies. All of these have 
helped to develop the attached scopes and budgets.  
 
 
 
 

Page 110

  
 
PROJECT BUDGET 
 
 
Overview Pricing: 
Below are suggested project scope items for each site. Full break down has been included in individual budgets 
and may contain additional options for consideration. 
 
- Track and Field  
o Option 2 Reconstruction      $ 600,000 - $750,000 
o Synthetic Turf Replacement      $ 675,000 - $750,000 
o Synthetic Track Renovation      $ 755,000 - $940,000 
o Ball Netting        $ 135,000 - $170,000 
o New Bleachers with Press Box      $ 650,000 - $ 750,000 
➢ Suggested Budget $2,815,000 - $3,360,000 
   
 
- Baseball / Softball Field 
o Field Reconstruction       $ 2,850,000 - $3,450,000 
o New Scoreboard       $ 90,000 - $ 125,000 
o Athletic Field Lighting        $ 675,000 - $ 750,000 
➢ Suggested Budget $3,615,000 - $4,325,000  
 
- Tennis Courts 
o Post Tension Concrete Courts      $ 1,200,000 - $ 1,300,000 
o Walkways and Plantings       $115,000 - $150,000 
➢ Suggested Budget $1,315,000 - $1,450,000  
 
- Field 2 
o Turf Replacement       $ 650,000 - $ 700,000 
o Improved Ball Netting       $ 45,000 - $ 85,000 
o New Scoreboard       $65,000 - $ 95,000 
➢ Suggested Budget $ 760,000 - $ 880,000  
 
 
 
- Suggested Referendum Proposal:      $8,505,000 - $10,015,000 
o The suggested referendum proposal is provided as an overall budget for the Town to procure funds for 
the overall project to be completed. FieldTurf will work with the Town to develop the final scope of the 
project to allow a firm price and project prior to development of a referendum. It is likely that the 
provided budget numbers will be revised after additional scope refinement. 

Page 111

G R A N B Y
G R A N B Y
3
1
2
5
4 c
50 SEATS
c
3
1
2
5 4
c
50 SEATS
c 3
12
5
4
c
50 SEATS
c
0'40'160'
SCALE: 1"=80'
80'
GRANBY MEMORIAL HIGH SCHOOL
ATHLETIC FACILITIES
39 SCHOOL STREET
GRANBY, CONNECTICUTACHUSETTSAPRIL 15, 2025
FULL SITE
Drawing: P:\ESTIMATING\2024 BID ACTIVITY\CONNECTICUT\GRANBY\GRANBY HS CONCEPTS FINAL.DWG Layout Tab:FULL SITEPlotted by: T017224    On this date: Fri, 2025 April 18 - 10:40am
NOTES:
1)ALL DESIGN AND EXISTING CONDITIONS MAPPING BASED
ON AVAILABLE MAPPING AND SHOULD BE CONSIDERED
APPROXIMATE.
2)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA
AND REQUIRES A CERTIFIED FIELDTURF INSTALLER AND
BUILDER TO IMPLEMENT THE PROPOSED CONDITIONS.
3)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA
AND NO ATTEMPTS SHALL BE MADE TO DUPLICATE OR
REPLICATE WITHOUT THE PREMISSION OF FIELDTURF.
TRACK AND
FIELD
BASEBALL AND
SOFTBALL
FIELD 2
TENNIS

Page 112

  
 
PROJECT BUDGET 
 
GRANBY MEMORIAL HIGH SCHOOL   
TRACK & FIELD IMPROVEMENTS  
                
                     
 
 
 
 
 
 
 
 
                          Existing Conditions Aerial 
 
 
 
 
Conceptual Layout  
 
Date:  April 18, 2025 
Prepared For:  Karl Gates - Athletic Director & Student Activities Coordinator              
Prepared By:  Andrew Dyjak – Regional Vice President, New England 
  Chris Hulk, PE – Regional Vice President, New England 
  Jonathan Luster, PE – Regional Construction Manager, New England 
Address: Granby Memorial High School| 54 N Granby Rd, Granby, CT 06035 
 
This budget proposal encompasses all facets of the project, with FieldTurf offering a comprehensive, turnkey solution 
that includes design, project oversight, and construction. The budget is based on current site conditions, review meeting 
with the school, and the planned construction period in spring/summer 2026.  
FieldTurf pricing is based on the Capital Region Education Council (CREC) program. CREC is a member of The Association 
of Educational Purchasing Agencies (AEPA) program. The AEPA is a purchasing co-op that provides member schools with 
pre-determined preferential pricing by approved vendors. Since the product has already been bid at the national level, 
individual schools do not have to duplicate the formal bid process. AEPA IFB #024.  
 
 
      Click on the following AEPA hyperlink for more information:  AEPA IFB #24 
 
Below is a detailed cost breakdown for site construction, turf installation and overall implementation of the project. 
 
 

Page 113

  
 
PROJECT BUDGET 
 
Project Description: 
The existing track and field at Granby Memorial High School is in need of remediation efforts from sinks holes that have 
developed along the eastern side of the track / field. Based on geotechnical information provided by the Town, it 
appears that organic material has decayed below the eastern side of the track / field. The depths of this material are 
present up to 10’ below existing grade.  
Several options for remediation efforts have been developed with associated budgets. Final scope will require additional 
discussion and planning with the School and Town. FieldTurf has developed each option as a stand-alone project and 
also included several alternatives for consideration. For example, as part of Option 2, various areas of the track and field 
will need to be removed and based on the age and amount of removal it would be prudent to replace the full extent of 
the track surfacing and turf surfacing to begin new warranty period. Lastly, alternates have been included for site 
improvements such as LED lighting, press box, ball netting, etc…  
Depending on final scope, the project is anticipated to be constructed in a ±3-4-month timeframe. It is also anticipated 
that access and staging areas will be available nearby. This budget is intended to assist the school in preparing for this 
project. Additional discussions, review and programming will be required to refine the scope and budget prior to 
construction.  
FIELD REMEDIATION OPTIONS: 
➢ Option 1 $1,150,000 - $1,300,000 
• General Scope: Reconstruction of +/- 1/3 of Track/Field 
o Remove and dispose of existing track surfacing within limits shown 
o Cut and remove existing synthetic turf up to soccer field limits 
o Full depth mill of existing track pavement within limits shown 
o Excavate, remove and salvage existing field stone base and processed 
aggregate track base 
o Remove and dispose of existing turf anchor curb and track drain within limits 
shown 
o Remove and salvage existing storm drainage piping 
o Remove and dispose of existing electrical conduit and wiring within field area 
o Excavate and remove existing soils to a depth of approximately 10’ to remove 
unsuitable soils 
o Provided adequate shoring and safety measures 
o Town provided 3rd party field testing agency 
o Furnish and install new subgrade materials, compact in lifts to geotechnical 
recommendations 
o Furnish and install geogrid support mesh in 2 layers 
o Reinstall drainage piping and electrical conduits 
o Furnish and install new ACO drain and concrete turf anchor curb 
o Reinstall appropriate base materials for track and field areas 
o Install new pavement from limits of removal 
o Furnish and install new track surfacing and striping within limits shown 
o Furnish and install new synthetic turf within limits shown 
 
 
 
 

Page 114

  
 
PROJECT BUDGET 
 
➢ Option 2 $600,000 - $750,000 
• General Scope: Extensive Exploration and Solidify 
o GPS located major sink hole areas and record for future exploration use 
o Remove and dispose of existing track surfacing within limits shown 
o Remove existing infill and roll back existing synthetic turf to soccer limits 
o Full depth mill of existing track pavement within limits shown 
o Excavate, remove and salvage existing field stone base and processed 
aggregate track base as necessary 
o Remove and dispose of existing turf anchor curb and track drain in various 
areas and install new 
o Remove and replace damaged sections of drainage piping 
o Remove and dispose of existing electrical conduit and wiring if encountered 
during exploration 
o Conduct a series of 10’ deep x 2’ diameter augur holes along eastern side of 
track / field 
o Remove and dispose of excavated material 
o Install flowable fill in all excavated holes to a depth of approximately 1’ below 
finished grade 
o Furnish and install geogrid support mesh prior to backfill 
o Town provided 3rd party field testing agency 
o Furnish and install new subgrade materials, compact in lifts to geotechnical 
recommendations 
o Reinstall drainage piping and electrical conduits as necessary 
o Furnish and install new ACO drain and concrete turf anchor curb 
o Reinstall appropriate base materials for track and field areas 
o Install new pavement from limits of removal 
o Furnish and install new track surfacing and striping within limits shown 
o Furnish and install new synthetic turf within limits shown 
 
 
SYNTHETIC TURF IMPROVEMENTS 
➢ Synthetic Turf Installation  $675,000 - $750,000 
• Remove and recycle existing synthetic turf carpet and infill 
• Laser grade base stone and supplement base stone as needed in order to achieve 
planarity prior to turf installation 
• Furnish and install synthetic turf for field 
• Synthetic turf with SBR rubber and sand infill  
• Colored end zone 
• Alternating turf panels 
• Post installation GMAX field testing 
 
 
➢ End Zone Letters $15,000 - $28,000 
• “GRANBY” end zone lettering  
➢ Midfield Logo $15,000 - $20,000 
• Midfield Grizzly Style Logo  
 

Page 115

  
 
PROJECT BUDGET 
 
TRACK IMPROVEMENTS 
➢ Track Base Reconstruction $375,000 - $450,000 
• Remove and dispose of existing rubberized track surface 
• Mill and dispose of existing asphalt base (Top 1.5”) 
• Pave 1.5” asphalt base  
o Match grades to existing perimeter trench drain which is to remain 
 
 
➢ Track Surfacing BSS-100 $350,000 - $450,000 
• Supply and install Beynon BSS-100 polyurethane track surfacing 
o Base color: Beynon red 
• Perform track striping 
                                                                               OR 
 
➢ Track Surfacing BSS-300 $580,000 - $650,000 
• Supply and install Beynon BSS-300 polyurethane track surfacing 
o Base color: Beynon red 
• Perform track striping 
 
 
➢ Colored Exchange Zones $30,000 - $40,000 
• (3) colored exchange zones  
 
SITE IMPROVEMENTS 
➢ New Perimeter Chain Link Fencing (1500 L.F.) $70,000 - $80,000 
• Existing foundations and poles to remain and be painted 
• Supply and install new 4’ height chain link mesh, top and bottom rails, and hardware 
 
 
➢ 20’ Height Ball Safety Netting  $80,000 - $95,000 
• Supply and install 20-foot-high ball safety netting in D-Zones, including foundations, 
sleeves, poles, netting, and hardware along the field end lines 
 
 
➢ 10’ Height Ball Safety Netting $55,000 - $75,000 
• Supply and install 10-foot-high ball safety netting in corners of field up to 20 yard line, 
including foundations, sleeves, poles, netting, and hardware along the field end lines 
 
 
➢ Press Box     $175,000 - $225,000 
• Furnish and install new press box behind existing bleachers 
• Includes new foundation and support structure 
• ADA access lift listed as separate item if needed 
 
 
➢ ADA Lift $95,000 - $125,000 
• Furnish and install new ADA accessible lift to press box 
• Includes foundation and installation 
 

Page 116

  
 
PROJECT BUDGET 
 
 
➢ Retrofit of Existing Athletic Lighting  $200,000 - $250,000 
• Remove and dispose of existing light fixtures and replace with LED fixtures 
• Poles to remain 
 
 
➢ New Bleachers with Press Box  $650,000 - $750,000 
• Furnish and install new double sided bleachers to service both fields (+/- 400 seats) 
• Furnish and install press box between fields for use for both fields 
• Furnish and install concrete slab for  bleachers 
• Provide power supply 
 
 
 
 
 
EXCLUSIONS 
➢ Any costs associated with necessary charges 
relating to the delineation of the field 
➢ The supply of manholes or clean-outs or grates, 
or supply of the manhole covers 
➢ Any alteration or deviation from specifications 
involving extra costs, which alteration or 
deviation will be provided only upon executed 
change orders, and will become an extra charge 
over and above the offered price 
➢ Soil stabilization or remediation of any type 
➢ Mass Excavation as required to achieve 
subgrade  
➢ Rock excavation 
➢ Offsite disposal of generated spoils  
➢ Excavation or disposal of unsuitable or 
contaminated soils 
➢ Site security  
➢ Once subgrade has been established, a proof 
roll will be performed to ensure structural 
stability of the soils; in the event that unsuitable 
soils are encountered, a price to remedy these 
areas can be negotiated based on 
recommended methods per project Engineer 
➢ Testing or Inspection Fees 
➢ Site restoration, sodding, landscaping or grow-
in beyond disturbed areas 
➢ Repair or resurfacing existing asphalt parking 
lot if damaged by truck traffic 
➢ Bond fees and non-local permits 
 
 
Please feel free to reach out to any member of our project team with questions about our offer: 
 
Andrew Dyjak 
Regional Vice President 
(860) 333-7839 
Andrew.Dyjak@Fieldturf.com
 
  
Chris Hulk 
Regional Vice President 
203-676-4445 
christopher.hulk@fieldturf.com  
 
 
 
Jonathan Luster, PE 
Regional Construction Manager 
(860) 227-4915 
Jonathan.Luster@FieldTurf.com 
 

Page 117

G R A N B Y
G R A N B Y
0'15'60'
SCALE: 1"=30''
30'
GRANBY MEMORIAL HIGH SCHOOL
TRACK & FIELD
39 SCHOOL STREET
GRANBY, CONNECTICUTACHUSETTSAPRIL 15, 2025
TRACK & FIELD
Drawing: C:\USERS\T017224\DESKTOP\FIELDTURF\GRANBY\GRANBY HS CONCEPTS.DWG Layout Tab:TRACKPlotted by: T017224    On this date: Tue, 2025 April 15 - 7:32am
FURNISH AND INSTALL NEW PRESS BOX
REMEDIATION AREA OPTIONS:
1)OPTION 1: LIMITED WORK
-CUT AND REMOVE TRACK SURFACING WITHIN
LIMITS
-REMOVE TURF INFILL AND PULL BACK CARPET
-REMOVE EXISTING CONCRETE CURBING,
PAVEMENT, STORM PIPING AND ELECTRICAL
PIPING
-EXCAVATE TO A DEPTH OF APPROXIMATELY 10' TO
REMOVE UNSUITABLE SOILS
-BACKFILL IN LIFTS TO PROPERLY COMPACT
-RE-INSTALL DRAINAGE PIPING, ELECTRICAL AND
CONCRETE TURF ANCHOR CURB
-RE-PAVE TRACK WITHIN DISTURBED LIMITS
-INSTALL NEW TRACK SURFACING AND REINSTALL
TURF
2) OPTION 2: FULL UPDATE
-REMOVE AND DISPOSE OF TRACK SURFACING
-REMOVE AND RECYCLE EXISTING SYNTHETIC TURF
-CONDUCT A SERIES OF APPROXIMATELY (30)
12"-16" DIAMETER AUGURED HOLES TO DEPTHS
ASSUMED TO BE 8'-10' TO IDENTIFY OVERALL
EXTENT OF UNSUITABLE SOILS
--REMOVE AND DISPOSE OF EXCAVATED
MATERIALS
--BACKFILL WITH FLOWABLE FILL TO A DEPTH
OF 1' BELOW FINISHED GRADE
--INSTALL APPROPRIATE BASE MATERIALS
-REMOVE AND REPLACE PORTIONS OF EXISTING
CONCRETE CURBING, PAVEMENT, STORM PIPING
AND ELECTRICAL PIPING
-BACKFILL IN LIFTS TO PROPERLY COMPACT
-FULL DEPTH MILL AND REPAVE TRACK IN LIMITS
SHOWN
-RESURFACE NEW BSS-100 OR BSS-300 TRACK
SURFACING ON FULL TRACK
-FINE GRADE EXISTING STONE BASE AND
SUPPLEMENT AS NEEDED
-INSTALL NEW SYNTHETIC TURF ON FULL FIELD
NOTES:
1)ALL DESIGN AND EXISTING CONDITIONS MAPPING BASED
ON AVAILABLE MAPPING AND SHOULD BE CONSIDERED
APPROXIMATE.
2)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA
AND REQUIRES A CERTIFIED FIELDTURF INSTALLER AND
BUILDER TO IMPLEMENT THE PROPOSED CONDITIONS.
3)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA
AND NO ATTEMPTS SHALL BE MADE TO DUPLICATE OR
REPLICATE WITHOUT THE PREMISSION OF FIELDTURF.
FULLY PROGRAMMABLE
SCOREBOARD
NEW GATES AT KEY LOCATIONS
REMOVE AND REPLACE TRACK
SURFACING
REMOVE AND REPLACE
SYNTHETIC TURF
DUAL SIDED BLEACHERS WITH
PRESS BOX
RETROFIT EXISTING LIGHTING SYSTEM TO
BE LED
BALL SAFETY NETTING SYSTEM

Page 118

  
 
PROJECT BUDGET 
 
GRANBY MEMORIAL HIGH SCHOOL   
BASEBALL & SOFTBALL IMPROVEMENTS 
 
                
                     
 
 
 
 
 
 
 
 
                    Existing Conditions Aerial 
 
 
 
 
Conceptual Layout  
 
Date:  April 21, 2025 
Prepared For:  Karl Gates - Athletic Director & Student Activities Coordinator              
Prepared By:  Andrew Dyjak – Regional Vice President, New England 
  Chris Hulk, PE – Regional Vice President, New England 
  Jonathan Luster, PE – Regional Construction Manager, New England 
Address: Granby Memorial High School| 54 N Granby Rd, Granby, CT 06035 
 
This budget proposal encompasses all facets of the project, with FieldTurf offering a comprehensive, turnkey solution 
that includes design, project oversight, and construction. The budget is based on current site conditions, review meeting 
with the school, and the planned construction period in spring/summer 2026.  
FieldTurf pricing is based on the Capital Region Education Council (CREC) program. CREC is a member of The Association 
of Educational Purchasing Agencies (AEPA) program. The AEPA is a purchasing co-op that provides member schools with 
pre-determined preferential pricing by approved vendors. Since the product has already been bid at the national level, 
individual schools do not have to duplicate the formal bid process. AEPA IFB #024.  
 
 
      Click on the following AEPA hyperlink for more information:  AEPA IFB #24 
 
Below is a detailed cost breakdown for site construction, turf installation and overall implementation of the project. 
 
 

Page 119

  
 
PROJECT BUDGET 
 
Project Description: 
This project proposes to reconstruct the existing baseball to a new all-weather synthetic turf field with baseball, softball 
and overlay fields.  
 
The existing field will have all fencing, topsoil, irrigation, and clay removed. Earthmoving activities will be conducted to 
achieve proposed grades. The field will then have the concrete turf anchor curbing, stone base, and drainage system 
installed. Fencing of various heights and sizes will be installed and be integral to the concrete turf anchor curb. 
Additionally, a tension netting backstop system extending from one dugout to the other is proposed. Additional scope 
items such as new dugouts, new LED light fixtures, bleachers, and walkways have been added as alternates to the base 
bid. 
 
Depending on final scope, the project is anticipated to be constructed in a ± 4-month timeframe. It is also anticipated 
that access and staging areas will be available nearby. This budget is intended to assist the town in preparing for this 
project. Additional discussions, review, and programming will be required to refine the scope and budget prior to 
construction. 
➢ Note: All plans will be developed by FieldTurf in house licensed professionally engineering staff 
 
➢ Site Civil Construction    
o Install Sediment and Erosion Controls Including Construction Entrance Pad 
o Remove Existing Topsoil, Irrigation, And Fencing 
• Topsoil To Be Removed from Site 
o Import / Export General Fill to Meet Proposed Field Grades 
o Cut And Cap Existing Irrigation System 
• Install Turf Box with Quick Coupler Connection 
o Furnish And Install All Concrete Turf Anchor Curbing 
o Furnish And Install Fencing and Netting as Applicable  
o Furnish And Install Storm Drainage Piping and Flat Panel Drains 
o Installation Of Dynamic Stone Base Layers and Storm Drainage Overflow 
o Furnish And Install Concrete Pads and Walkways 
o Furnish And Install Tension Netting Backstop  
o Furnish And Install Batting Cage/ Bullpen Area 
o Fine Grade Field in Preparation of Synthetic Turf 
o Furnish And Install Concrete Slab for Dugouts and Portable Bleachers  
o Improve Paved Access to Field 
o Install Finish Materials and Restore Site to Pre-Construction Conditions 
 
➢ Synthetic Turf   
o Furnish And Install Synthetic Turf for Field 
o Synthetic Turf with SBR Rubber and Sand Infill  
o Colors And Field Markings as Shown on Rendering 
o No logos or specialize lettering 
o Post Installation GMAX Field Testing  
 
 
SUGGESTED PROJECT BUDGET  $ 2,900,000– $ 350,000 

Page 120

  
 
PROJECT BUDGET 
 
 
➢ Contingency        
o A typical project of this type and scope we would suggest a contingency for design, general 
conditions, and construction of 8% - 10%. This contingency would provide the School / Town level 
of safety for unknown site conditions such as rock removal, unsuitable soils, etc. 
 
➢ Alternate: New Scoreboard                                 $90,000 - $125,000 
o Furnish And Install Multi-Use Scoreboard 
o Assumed Programmable Boards with Display/Naming Panel Above Board 
o Scoreboard (8’H X 25’W) 
 
➢ Alternate: New LED Lighting Fixtures                            $675,000 - $750,000 
o Furnish And Install New LED Light Fixtures on Existing Poles 
o Assumed 8 Pole System 
o New Power Supply within 100’ of Field 
 
 
EXCLUSIONS 
➢ Any costs associated with necessary charges 
relating to the delineation of the field 
➢ The supply of manholes or clean-outs or grates, 
or supply of the manhole covers 
➢ Any alteration or deviation from specifications 
involving extra costs, which alteration or 
deviation will be provided only upon executed 
change orders, and will become an extra charge 
over and above the offered price 
➢ Soil stabilization or remediation of any type 
➢ Mass Excavation as required to achieve 
subgrade  
➢ Rock excavation or ledge removal 
➢ Offsite disposal of generated spoils  
➢ Excavation or disposal of unsuitable or 
contaminated soils 
➢ Site security  
➢ Once subgrade has been established, a proof 
roll will be performed to ensure structural 
stability of the soils; in the event that unsuitable 
soils are encountered, a price to remedy these 
areas can be negotiated based on 
recommended methods per project Engineer 
➢ Testing or Inspection Fees 
➢ Site restoration, sodding, landscaping or grow-
in beyond disturbed areas 
➢ Repair or resurfacing existing asphalt parking 
lot if damaged by truck traffic 
➢ Bond fees and non-local permits 
 
 
Please feel free to reach out to any member of our project team with questions about our offer: 
 
Andrew Dyjak 
Regional Vice President 
(860) 333-7839 
Andrew.Dyjak@Fieldturf.com
 
  
Chris Hulk 
Regional Vice President 
203-676-4445 
christopher.hulk@fieldturf.com  
 
 
 
Jonathan Luster, PE 
Regional Construction Manager 
(860) 227-4915 
Jonathan.Luster@FieldTurf.com 
 

Page 121

3
1
2
5
4
c
50 SEATS
c
3
1
2
5
4
c
50 SEATS c
3
1
2
5
4
c
50 SEATS c
GRANBY MEMORIAL HIGH SCHOOL
BASEBALL FACILITY IMPROVEMENTS
PLEASANT STREET
GRANBY, CONNECTICUTAPRIL 14, 2025
BASEBALL
Drawing: C:\USERS\T017224\DESKTOP\FIELDTURF\GRANBY\GRANBY HS CONCEPTS.DWG Layout Tab:BASEBALLPlotted by: T017224    On this date: Tue, 2025 April 15 - 6:57am
0'15'30'
SCALE: 1"=30'
60'
NOTES:
1)ALL DESIGN AND EXISTING CONDITIONS MAPPING BASED
ON AVAILABLE MAPPING AND SHOULD BE CONSIDERED
APPROXIMATE.
2)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA
AND REQUIRES A CERTIFIED FIELDTURF INSTALLER AND
BUILDER TO IMPLEMENT THE PROPOSED CONDITIONS.
3)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA
AND NO ATTEMPTS SHALL BE MADE TO DUPLICATE OR
REPLICATE WITHOUT THE PREMISSION OF FIELDTURF.
DUAL BULLPEN
SYNTHETIC TURF FIELD
±140,000 S.F.
BASEBALL 310' L, 330'R, 490' C
 SOCCER 330'x195'
SOFTBALL: 210' RADIUS
FOUL POLE INTEGRAL TO FENCE
LINE
DUAL BATTING CAGES FOR BOTH
SOFTBALL AND BASEBALL
GAME SHADE STRUCTURE DUGOUT WITH
FENCE SURROUND ON CONCRETE PAD
(TYPICAL)
CONCRETE PAD AND ACCESS FOR
PORTABLE BLEACHERS
VISITING BULLPEN
POTENTIAL BLEACHER PAD
BACKSTOP WITH TENSION NETTING
AND WALL SYSTEM
ATHLETIC FIELD LIGHTING
(TYPICAL)
IMPROVED FIELD ACCESS
30' HT. TENSION NETTING
BACKSTOP
PORTABLE FENCING
FULLY PROGRAMMABLE
SCOREBOARD

Page 122

  
 
PROJECT BUDGET 
 
GRANBY MEMORIAL HIGH SCHOOL   
TENNIS COURT IMPROVEMENTS  
                
                     
  
 
 
 
 
Existing Conditions Aerial 
 
 
 
 
                                     Conceptual Layout  
 
Date:  April 18, 2025 
Prepared For:  Karl Gates - Athletic Director & Student Activities Coordinator              
Prepared By:  Andrew Dyjak – Regional Vice President, New England 
  Chris Hulk, PE – Regional Vice President, New England 
  Jonathan Luster, PE – Regional Construction Manager, New England 
Address: Granby Memorial High School| 54 N Granby Rd, Granby, CT 06035 
 
This budget proposal encompasses all facets of the project, with FieldTurf offering a comprehensive, turnkey solution 
that includes design, project oversight, and construction. The budget is based on current site conditions, review meeting 
with the school, and the planned construction period in spring/summer 2026.  
FieldTurf pricing is based on the Capital Region Education Council (CREC) program. CREC is a member of The Association 
of Educational Purchasing Agencies (AEPA) program. The AEPA is a purchasing co-op that provides member schools with 
pre-determined preferential pricing by approved vendors. Since the product has already been bid at the national level, 
individual schools do not have to duplicate the formal bid process. AEPA IFB #024.  
 
 
      Click on the following AEPA hyperlink for more information:  AEPA IFB #24 
 
Below is a detailed cost breakdown for site construction, court installation and overall implementation of the project. 
 
 

Page 123

  
 
PROJECT BUDGET 
 
Project Description: 
This project proposes to reconstruct the existing tennis courts to new post tension concrete courts. The existing tennis 
courts will be reclaimed in place and regrade to meet current standards. All existing vegetation, fencing, pavement and 
netting will be removed and disposed of. The reconstruction will also include all new post tension concrete courts, 
fencing, netting and court surfacing. Additionally, alternates have been added to the areas outside of the courts for new 
plantings, walkways, lighting, etc… 
 
The project is expected to be completed in  +/- 3 months. The courts will be constructed in two separate slabs to 
accommodate the grade changes and court layout. It is anticipated that access and staging areas will be available 
nearby. This budget is intended to assist the school in preparing for this project. Additional discussions, review and 
programming will be required to refine the scope and budget prior to construction.  
 
➢ Note: All plans will be developed by FieldTurf in house licensed professionally engineering staff 
 
➢ TENNIS COURT RECONSTRUCTION  $1,200,000 - $1,300,000 
• Tennis Court Reconstruction                    
o Install Sediment & Erosion Controls 
o Remove Existing Site Features  
o Reclaim Existing Pavement In Place 
o Perform Mass Earthwork Operations 
o Cuts And Fills to Meet Proposed Subgrade 
o Laser Grade Subgrade and Compact 
o Furnish And Install Gravel Base and Processed Aggregate Base Materials 
o Furnish And Install New Net Footings, Posts, Nets and Center Straps 
o Furnish And Install 5-1/2” Post Tensioned Concrete Court Slab 
• Structural Warranty of 50 years is included 
o Furnish And Install Black Vinyl Coated Chain Link Fence and Gates 
o Surface Courts With Up To 2 Colors 
o Furnish And Install All Court Striping 
 
  
 
➢ Alternate 1: Walkways and Planting                                             $115,000 - $150,000 
o Furnish and install new concrete walkways 
o Furnish and install area for gazebo style covered area 
o Furnish and install plantings 
 
 
➢ Alternate 2: Court Lighting                                             $250,000 - $350,000 
o Furnish and install new LED court lighting on 6 courts 
o Supply power from nearby source within 100’ of site 
o Supply digital control system for access via phone or internet for light 
controls 
 
 
 
 

Page 124

  
 
PROJECT BUDGET 
 
EXCLUSIONS 
➢ Any costs associated with necessary charges 
relating to the delineation of the field 
➢ The supply of manholes or clean-outs or grates, 
or supply of the manhole covers 
➢ Any alteration or deviation from specifications 
involving extra costs, which alteration or 
deviation will be provided only upon executed 
change orders, and will become an extra charge 
over and above the offered price 
➢ Soil stabilization or remediation of any type 
➢ Mass Excavation as required to achieve 
subgrade  
➢ Rock excavation 
➢ Offsite disposal of generated spoils  
➢ Excavation or disposal of unsuitable or 
contaminated soils 
➢ Site security  
➢ Once subgrade has been established, a proof 
roll will be performed to ensure structural 
stability of the soils; in the event that unsuitable 
soils are encountered, a price to remedy these 
areas can be negotiated based on 
recommended methods per project Engineer 
➢ Testing or Inspection Fees 
➢ Site restoration, sodding, landscaping or grow-
in beyond disturbed areas 
➢ Repair or resurfacing existing asphalt parking 
lot if damaged by truck traffic 
➢ Bond fees and non-local permits 
 
 
Please feel free to reach out to any member of our project team with questions about our offer: 
 
Andrew Dyjak 
Regional Vice President 
(860) 333-7839 
Andrew.Dyjak@Fieldturf.com
 
  
Chris Hulk 
Regional Vice President 
203-676-4445 
christopher.hulk@fieldturf.com  
 
 
 
Jonathan Luster, PE 
Regional Construction Manager 
(860) 227-4915 
Jonathan.Luster@FieldTurf.com 
 

Page 125

GRANBY MEMORIAL HIGH SCHOOL
TENNIS FACILITY IMPROVEMENTS
PLEASANT STREET
GRANBY, CONNECTICUTAPRIL 14, 2025
TENNIS
Drawing: C:\USERS\T017224\DESKTOP\FIELDTURF\GRANBY\GRANBY HS CONCEPTS.DWG Layout Tab:TENNISPlotted by: T017224    On this date: Tue, 2025 April 15 - 7:05am
0'15'30'
SCALE: 1"=30'
60'
NOTES:
1)ALL DESIGN AND EXISTING CONDITIONS MAPPING BASED
ON AVAILABLE MAPPING AND SHOULD BE CONSIDERED
APPROXIMATE.
2)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA
AND REQUIRES A CERTIFIED FIELDTURF INSTALLER AND
BUILDER TO IMPLEMENT THE PROPOSED CONDITIONS.
3)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA
AND NO ATTEMPTS SHALL BE MADE TO DUPLICATE OR
REPLICATE WITHOUT THE PREMISSION OF FIELDTURF.
POST TENSION CONCRETE
TENNIS COURTS
ATHLETIC LIGHTING
POTENTIAL COVERED PAVILION
CONCRETE WALKWAY AND
ACCESS PATH
POTENTIAL BENCH SEATING
PLANTINGS

Page 126

  
 
PROJECT BUDGET 
 
GRANBY MEMORIAL HIGH SCHOOL   
FIELD 2 IMPROVEMENTS  
                
                     
 
 
 
 
 
 
 
 
                          Existing Conditions Aerial 
 
 
 
 
Conceptual Layout  
 
Date:  April 21, 2025 
Prepared For:  Karl Gates - Athletic Director & Student Activities Coordinator              
Prepared By:  Andrew Dyjak – Regional Vice President, New England 
  Chris Hulk, PE – Regional Vice President, New England 
  Jonathan Luster, PE – Regional Construction Manager, New England 
Address: Granby Memorial High School| 54 N Granby Rd, Granby, CT 06035 
 
This budget proposal encompasses all facets of the project, with FieldTurf offering a comprehensive, turnkey solution 
that includes design, project oversight, and construction. The budget is based on current site conditions, review meeting 
with the school, and the planned construction period in spring/summer 2026.  
FieldTurf pricing is based on the Capital Region Education Council (CREC) program. CREC is a member of The Association 
of Educational Purchasing Agencies (AEPA) program. The AEPA is a purchasing co-op that provides member schools with 
pre-determined preferential pricing by approved vendors. Since the product has already been bid at the national level, 
individual schools do not have to duplicate the formal bid process. AEPA IFB #024.  
 
 
      Click on the following AEPA hyperlink for more information:  AEPA IFB #24 
 
Below is a detailed cost breakdown for site construction, turf installation and overall implementation of the project. 
 
 

Page 127

  
 
PROJECT BUDGET 
 
Project Description: 
The project proposes to replace the existing synthetic turf carpet with new synthetic turf. The existing turf will be cut 
into sections, rolled up, and removed from the field. The existing infill will either be placed in sacks for reuse or removed 
from the field and brought to a recycling facility. The field will then be laser graded to achieve planarity before the new 
turf is laid down and installed on the field. If additional topping stone is needed to achieve planarity, more stone will be 
brought in. Additional scope items such as new LED lighting pole and fixtures, ball safety netting, and walkways have 
been added to the budget below as well.  
Depending on final scope, the project is anticipated to be constructed in a ±2-3 month timeframe. It is also anticipated 
that access and staging areas will be available nearby. This budget is intended to assist the school in preparing for this 
project. Additional discussions, review and programming will be required to refine the scope and budget prior to 
construction.  
SYNTHETIC TURF IMPROVEMENTS 
➢ Synthetic Turf Installation  $650,000 - $700,000 
• Remove And Recycle Existing Synthetic Turf Carpet And Infill 
• Laser Grade Base Stone And Supplement Base Stone As Needed In Order To Achieve 
Planarity Prior To Turf Installation 
• Furnish And Install Synthetic Turf For Field 
• Synthetic Turf With SBR Rubber And Sand Infill  
• Colors And Logos Per Rendering 
• Post Installation GMAX Field Testing 
 
 
➢ Alternate: Midfield Logo                                $15,000 - $20,000 
• Midfield Grizzly Style Bear 
 
 
➢ Alternate: Improved Ball Netting                                 $45,000 - $85,000 
o Remove Existing Ball Netting 
o Furnish And Install New Ball Netting 
o Final Size And Location T.B.D. 
 
➢ Alternate: New Scoreboard                                 $65,000 - $95,000 
o Furnish And Install Multi-Use Scoreboard 
o Assumed Programmable Boards With Display/Naming Panel Above Board 
o Scoreboard (8’h X 25’w) 
 
➢ Alternate 5: New Led Lighting Fixtures                            $475,000 - $550,000 
o Furnish And Install New Led Light Fixtures On Existing Poles 
o Assumed 4 Pole System 
o New Power Supply Within 100’ Of Field 
 
 
 

Page 128

  
 
PROJECT BUDGET 
 
EXCLUSIONS 
➢ Any costs associated with necessary charges 
relating to the delineation of the field 
➢ The supply of manholes or clean-outs or grates, 
or supply of the manhole covers 
➢ Any alteration or deviation from specifications 
involving extra costs, which alteration or 
deviation will be provided only upon executed 
change orders, and will become an extra charge 
over and above the offered price 
➢ Soil stabilization or remediation of any type 
➢ Mass Excavation as required to achieve 
subgrade  
➢ Rock excavation 
➢ Offsite disposal of generated spoils  
➢ Excavation or disposal of unsuitable or 
contaminated soils 
➢ Site security  
➢ Once subgrade has been established, a proof 
roll will be performed to ensure structural 
stability of the soils; in the event that unsuitable 
soils are encountered, a price to remedy these 
areas can be negotiated based on 
recommended methods per project Engineer 
➢ Testing or Inspection Fees 
➢ Site restoration, sodding, landscaping or grow-
in beyond disturbed areas 
➢ Repair or resurfacing existing asphalt parking 
lot if damaged by truck traffic 
➢ Bond fees and non-local permits 
 
 
Please feel free to reach out to any member of our project team with questions about our offer: 
 
Andrew Dyjak 
Regional Vice President 
(860) 333-7839 
Andrew.Dyjak@Fieldturf.com
 
  
Chris Hulk 
Regional Vice President 
203-676-4445 
christopher.hulk@fieldturf.com  
 
 
 
Jonathan Luster, PE 
Regional Construction Manager 
(860) 227-4915 
Jonathan.Luster@FieldTurf.com 
 

Page 129

0'10'20'
SCALE: 1"=20'
40'
GRANBY MEMORIAL HIGH SCHOOL
FIELD 2
39 SCHOOL STREET
GRANBY, CONNECTICUTACHUSETTSAPRIL 15, 2025
FIELD 2
Drawing: C:\USERS\T017224\DESKTOP\FIELDTURF\GRANBY\GRANBY HS CONCEPTS.DWG Layout Tab:FIELD 2Plotted by: T017224    On this date: Tue, 2025 April 15 - 7:48am
NOTES:
1)ALL DESIGN AND EXISTING CONDITIONS MAPPING BASED
ON AVAILABLE MAPPING AND SHOULD BE CONSIDERED
APPROXIMATE.
2)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA
AND REQUIRES A CERTIFIED FIELDTURF INSTALLER AND
BUILDER TO IMPLEMENT THE PROPOSED CONDITIONS.
3)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA
AND NO ATTEMPTS SHALL BE MADE TO DUPLICATE OR
REPLICATE WITHOUT THE PREMISSION OF FIELDTURF.
FULLY PROGRAMMABLE
SCOREBOARD
REMOVE AND REPLACE
SYNTHETIC TURF
DUAL SIDED BLEACHERS WITH
PRESS BOX
NEW LED FIELD LIGHTING SYSTEM
BALL SAFETY NETTING SYSTEM
IMPROVED FIELD ACCESS

Page 130

 
 
HALEY & ALDRICH, INC. 
465 Medford St. 
Suite 2200 
Boston, MA  02129 
617.886.7400 
 
 www.haleyaldrich.com 
28 July 2025  
File No. 0206711-100 
 
 
Granby Public Schools 
15-B North Granby Road 
Granby, CT 06035 
 
Attention: Christopher DeGray, Director of Facilities 
 
Subject: Subsurface Conditions and Geotechnical Data Report 
  Granby Public Schools – Turf Field and Track 
  Granby, CT 
 
Ladies and Gentlemen:  
 
This Report provides a summary of the subsurface explorations conducted within the limits of the 
existing synthetic turf field and track for Granby Public Schools (the School) located at 50 North Granby 
Road in Granby, Connecticut (subject site).  The approximate location of the site is shown on Figure 1.  
 
The purpose of the subsurface investigation program conducted within the limits of the existing turf 
field and track was to obtain information on subsurface conditions encountered at the site, evaluate site 
fill thickness, and identify presence of potential void spaces within near surface soils.  The work reported 
herein was undertaken by Haley & Aldrich, Inc. (Haley & Aldrich) in accordance with our proposal dated 
30 April 2025 and your subsequent written authorization 
 
Existing Site Conditions 
 
Based on historic aerial photographs, the subject site has been used as an athletic field and track since 
at least 1992.  We understand that the current synthetic turf field and track surface was constructed 
between 2012 and 2013 and that the proposed site grade changes required for construction in the area 
of observed track settlement were not significantly greater than the existing site grades.  Existing site 
grades are approximately Elevation (El.) 220 to 225 (NAVD88)1  in the area of the track and athletic field 
surface. 
 
Settlement has been observed in various areas on the existing track surface and causes puddling after 
rain events, creating unsatisfactory performance conditions for athletics.   
 
 
 
 
1 Elevations in this report are in feet and reference the North American Vertical Datum of 1988 (NAVD88). 

Page 131

Granby Public Schools 
28 July 2025  
Page 2 
 
 
 
Proposed Development 
 
The School intends to replace the existing synthetic field and track surface within the next 5 years to 
bring them to performance-level standards for Granby Athletics.  Athletic lighting structures are also 
proposed to support athletic events after sunset.   
 
Subsurface Investigation Programs 
 
PREVIOUS HALEY & ALDRICH SUBSURFACE EXPLORATION PROGRAM  
 
Haley & Aldrich previously performed a subsurface investigation program in October 2022 on the site.  
The purpose was to observe the subsurface conditions specifically underlying the inside lane track in the 
northeast corner and evaluate the presence of possible void spaces beneath the track surface resulting 
in observed surficial settlement.  On 20 October 2022, Seaboard Drilling, LLC of Chicopee, Massachusetts 
conducted a total of seven geoprobes designated HA-1 through HA-7.  The drilling of geoprobes were 
observed by Haley & Aldrich.   
 
The designation and approximate locations of the geoprobes are shown on Figure 2 and geoprobe logs 
are included in Appendix A. 
 
RECENT SUBSURFACE EXPLORATION PROGRAM  
 
The purpose of the recent subsurface investigation program was to collect data beneath the existing turf 
field and track that may indicate future areas of settlement.  Explorations were not performed to 
support the athletic lighting structures at this time. 
 
The designation and approximate location of subsurface explorations are indicated on Figure 2.  The 
recent subsurface explorations were located in the field by Haley & Aldrich personnel by measuring 
from existing site features and therefore are considered approximate.  
 
Between 23 and 25 June 2025, G&M Subsurface of North Dighton, Massachusetts conducted a total of 
twenty-seven (27) geoprobe explorations within the limits of the existing synthetic turf field and track, 
designated GP-01 through GP-27.  GeoSurfaces of Woburn, Massachusetts performed the opening and 
repair of the synthetic turf surfaces at each of the geoprobe locations on the existing field.  The 
geoprobes were drilled to depths ranging from 10 to 20 (feet) ft below ground surface (bgs) with the use 
of a track-mounted geoprobe rig and were observed by Haley & Aldrich.  Refer to the Geoprobe Logs 
included in Appendix B for additional information.  
 
 
 
 
 

Page 132

Granby Public Schools 
28 July 2025  
Page 3 
 
 
 
Subsurface Conditions 
 
SOIL CONDITIONS 
 
Subsurface soil conditions encountered in the recent subsurface exploration program consisted of the 
following generalized sequence of subsurface units, listed in descending order of occurrence below 
ground surface.  Refer to Table I – Summary of Subsurface Conditions for a summary of the explorations 
performed in 2022 and 2025.   
 
Table I: Summary of Subsurface Conditions 
Generalized Subsurface 
Stratum 
Depth Top of Stratum 
(ft) 
Stratum Thickness 
(ft) 
Fill 0.3 to 1 0.4 to 15 
Glaciofluvial Deposits 0.5 to 13 Not Determined 
 
Note: one or more of the units may be absent at any specific location and may vary in thickness across 
the subject site.  A detailed description of the units encountered is provided below.  
 
Fill - The Fill encountered generally consisted of dark to light brown, red-brown, or gray-brown poorly-
graded Sand or silty Sand with varying amounts of silt, gravel, topsoil, wood, and organic soil. At the 
recent geoprobe locations GP-03, GP-05, GP-13, GP-22, the fill noted buried wood and pockets of dark 
brown organic soil (topsoil) between 0.5 and 5 ft bgs. 
 
The Fill layer was encountered in each of the geoprobes, except for GP-01, GP-06, and GP-08, and 
ranged from 0.4 to 15 ft in thickness.  A 0.5-ft-thick layer of crushed stone was encountered at ground 
surface at the locations of geoprobes conducted within the existing synthetic turf field.  An approximate 
0.1-ft-thick layer of track rubber followed by about 0.4 to 0.5-ft-thick layer of crushed stone was 
encountered at ground surface at the locations of geoprobes conducted within the limits of the existing 
track.  
 
The Fill layer was not fully penetrated at geoprobe GP-22 and HA-5 to a depth of 10 ft and at HA-6 to a 
depth of 15 ft. 
 
Glaciofluvial Deposits - Glaciofluvial Deposits were encountered beneath the Fill at each geoprobe 
location except for geoprobes GP-01, GP-06, and GP-08 where the Glaciofluvial Deposits were 
encountered underlying the crushed stone.  Glaciofluvial Deposits generally consisted of tan to light 
brown or red-brown poorly-graded Sand.  Glaciofluvial Deposits were not fully penetrated at any of the 
geoprobe locations.  
 
  

Page 133

Granby Public Schools 
28 July 2025  
Page 4 
 
 
 
GROUNDWATER LEVELS 
 
Groundwater was not encountered within the geoprobes at the time of drilling. 
 
Groundwater levels are influenced by precipitation, the presence of below-grade structures and utilities 
in the area, leakage into or out of utility pipes, the infiltration of surface water runoff, building 
underdrain systems, localized water recharging, and other factors.  Groundwater conditions 
encountered during subsequent site visits and/or during construction may differ from those reported 
herein, and as additional groundwater measurements are obtained during subsequent design phases, 
this report will be updated.  
 
Geotechnical Mitigation Considerations 
 
Since areas of settlement have been observed within the turf field, the School has been performing 
routine maintenance consisting of a subcontractor removing the turf surface and filling in localized low 
spots.  Additionally, the northeast corner of the track that was previously observed to experience 
settlement was patched and resurfaced between 2022 and 2023.  
 
Of the recent geoprobe explorations, locations GP-03, GP-05, GP-13, GP-22 encountered buried wood 
and pockets of dark brown organic soil (topsoil) between 0.5 and 5 ft bgs within the Fill layer.  These 
locations are spread out across the track and field and are not located in one central area, suggesting 
that other locations or areas between explorations may encounter similar conditions subject to future 
settlement. 
 
Full-Depth Restoration (recommended) 
 
To mitigate the risk of future settlement, we recommend that a full depth restoration of the field and 
track surface be performed prior to replacement of the surfaces.  Full depth restoration shall include: 
 
Site Preparation 
 
 Strip, remove, and dispose of existing rubber track surface and synthetic turf field and crushed 
stone subbase.   
 Excavate and remove the full depth of Fill up to a 5 ft depth beneath the track and field and 5 ft 
laterally outside the limits of the track.  Within the limits shown on Figure 2, the northeast 
corner of the track is recommended to be excavated and removed up to 10 ft due to presence of 
deeper Fill materials that are unsuitable for subbase of the track. 
 Segregate/screen/stockpile excavated Fill materials that are suitable for re-use as compacted 
granular fill beneath the track and field surface.  Remove and dispose of unsuitable Fill material 
(buried topsoil, organic materials, wood, etc).  
Reuse of any excavated soils will be dependent upon visual characterization of the materials and 
results of grain size analyses and laboratory compaction tests.  Accordingly, we recommend to 

Page 134

Granby Public Schools 
28 July 2025  
Page 5 
 
 
 
the extent possible that an on-site location be established for segregating, processing, and 
stockpiling excavated soils. 
 
Subgrade Preparation  
 
 After the Fill has been excavated, the subgrade shall be compacted to 95% of the material’s 
maximum dry unit weight (determined in accordance with ASTM D1557) using appropriate 
compactive efforts.  As a minimum, the subgrade should receive four complete coverages with 
suitable compaction equipment.  The excavated material may be reused after the wood or 
degradable materials are removed from the Fill material.   
 Place a woven geotextile fabric (Mirafi 600X or similar) on top of the prepared and approved 
subgrade as well as on the sides of the excavation. 
 The excavation shall be backfilled with previously excavated Fill material suitable for re-use or 
Granular Fill placed in loose lift thicknesses not exceeding 12 inches (in.), and the material shall 
be compacted to 95% of the material’s maximum dry unit weight (determined in accordance 
with ASTM D1557) using appropriate compactive efforts.  As a minimum, each layer of fill should 
receive four complete coverages with suitable compaction equipment. 
 
Following backfill and compaction to design subgrade elevation, re-construct the track and field. 
Refer to recommendations in following sections. 
 
Synthetic Turf Field  
 
 Following completion of subgrade preparation to design subgrade elevation for the new turf 
system, prepare the subgrade using a large compaction roller to prepare a firm, dry and stable 
subgrade.  If during static rolling of the subgrades pumping or weaving conditions are observed, 
alternative compaction techniques may be required and/or additional subgrade preparation 
may be recommended (e.g., removal and replacement of soft, compressible soils). 
 At all times prior to placement of the turf system, we recommend maintaining a dry and 
undisturbed design subgrade to ensure a stable working surface to receive the turf system.  
Temporary re-grading outside the limits of the new field will be required to divert surface runoff 
away from the work areas.  Construction dewatering is not anticipated; however, if it becomes 
necessary, efforts should be taken by the contractor to discharge dewatering effluent to an on-
site recharge system at distances away from the work areas so as not to disturb subgrade 
preparation. 
 For the permanent condition, the maintenance, protection and long-term performance of the 
synthetic turf field will require an effective stormwater runoff collection and management 
system.  Anticipated subsurface soils at and/or within shallow depths of the anticipated design 
subgrade level for the new synthetic turf fields are likely to consist of fine-grained sandy 
silts/silty sands that have poor drainage characteristics – vertically and laterally.  Design of any 
sub-turf drainage systems must consider the effect these impermeable subgrade soils can have 
on the field’s drainage capacity.  At a minimum, the sub-turf drainage systems must be designed 

Page 135

Granby Public Schools 
28 July 2025  
Page 6 
 
 
 
such that the system is entirely and at all times above groundwater level.  Design of the 
drainage system for the synthetic turf should be completed by a Civil Engineer.  For this report, 
we recommend the subgrade be pitched to direct drainage towards the sub-turf drainage 
system that would be comprised of a minimum 10 to 12-in. thick layer of double-washed, 3/4-in. 
crushed stone with perforated HDPE pipes that are sized by the Civil Engineer and embedded 
within the crushed stone so as to effectively collect and transport by gravity any accumulated 
runoff water that filters from the turf layer above to an appropriately sized on-site 
collection/groundwater recharge tank or, alternatively, direct the discharge into a permitted 
storm drain.  Prior to placing the crushed stone and perforated piping, a woven geotextile fabric 
(Mirafi 600X or similar) should be placed on top of the prepared and approved subgrade.  
Additionally, a backflow preventer at the outlet structure should be incorporated into the design 
of the drainage system. 
 3/4-in Crushed Stone shall consist of inert angular material derived from a stone quarry that is 
hard, durable, washed stone or crushed gravel, free from clay, loam, or other deleterious 
material, with a maximum size of 3/4 in, and conforming to the following: 
  
Sieve Size Percent Passing By Weight 
1 in. 100 
3/4 in. 90 – 100 
1/2 in. 10 – 50 
3/8 in. 0 – 20 
No. 4 0 – 5 
 
Synthetic Track  
 
 Following preparation to subgrade elevation, provide a minimum 12-in. layer of Granular Fill for 
the subbase of the asphalt.  Asphalt and rubberized track surface thickness should match 
original design drawings. 
 Granular Fill shall be obtained from off-site sources and shall consist of naturally occurring or 
processed, inert material that is hard, durable natural stone and coarse sand, free from loam, 
clay, surface coatings, and deleterious materials.   
 
Sieve Size Percent Passing By Weight 
3 in. 100 
No. 4 30 – 90 
No. 40 10 – 50 
No. 200 0 – 8 
 
  

Page 136

Granby Public Schools 
28 July 2025  
Page 7 
 
 
 
 If portions of the proposed track extend beyond the existing plan limits of the existing track, we 
recommend complete removal of the existing topsoil prior to compacting the subgrade and 
placement and compaction of a minimum 12-in. thick lift of granular fill to design subgrade 
elevation.   
 
Track and Field Surface Restoration (alternate consideration with routine maintenance) 
 
If project construction costs associated with the recommended over-excavation and backfilling are 
determined to not be acceptable to the School, the reduced scope of track and field surface restorations 
could be considered by the School as an alternate consideration that would not require the subgrade 
preparation in the full-depth restoration recommendation.  This option would not mitigate the risk of 
potential long term field performance issues due to the presence of the remaining unsuitable soils 
below the over-excavation limits but could allow the track and field to be utilized in the short term and 
would require periodic maintenance of both the synthetic turf field and track.   
 
For this consideration, the track and field surface restoration would consist of: 
 
 Remove/mill track surface down to asphalt base layer, patch observed cracks and shim 
depressions in the asphalt, and replace with new synthetic track surface/system.   
 Remove synthetic turf surface/carpet, raise grade with additional crushed stone where needed, 
and replace with new synthetic turf surface.  Prior to installing the new synthetic turf, the 
existing drainage stone should be tested to confirm design infiltration rate of the drainage layer 
is consistent with the synthetic turf field provider’s requirements.  Additionally, an inspection of 
the existing drainage piping (lateral field and perimeter drain lines) should be completed to 
confirm the drainage system is functioning as originally designed and meets stormwater 
management requirements for the new turf field system. 
 Surface track and synthetic turf surface restoration should be conducted by a specialty 
contractor familiar with the construction and repair of synthetic turf and track systems. 
 
Limitations 
 
This letter was prepared in accordance with our proposal dated 30 April 2025 and your subsequent 
written authorization. This letter has been prepared for the specific application to the Granby Public 
Schools synthetic turf field and track.  
 
The nature and extent of variations in the subsurface conditions between explorations may not become 
evident until construction, and the project design may change from our current understanding.  Any 
additional information pertaining to the project that becomes available should be provided to Haley & 
Aldrich, so that our conclusions and recommendations can be reviewed and modified, as necessary. 
 
  

Page 137

Granby Public Schools 
28 July 2025  
Page 8 
We appreciate the opportunity to provide engineering services on this project.  Please do not hesitate to 
call if you have any questions or comments. 
Sinc
erely yours, 
HALEY & ALDRICH, INC. 
M
egan H. Carlson, PE (NY)  R. S
cott Goldkamp, PE (MA/NH)
Project Manager         Principal
Attachments: 
Figure 1 – Site Locus 
Figure 2 – Site and Subsurface Exploration Location Plan 
Appendix A – Previous Geoprobe Logs 
Appendix B – Recent Geoprobe Logs 
\\haleyaldrich.com\share\CF\Projects\0206711\Granby Public Schools\Report\2025-0728-HAI-Granby Public Schools-Geotechnical Data Report-F.docx 

Page 138

APPROXIMATE SCALE: 1 INCH = 2,000 FEET 
41°57'39"N, 72°47'43"W
FIGURE 1MAP SOURCE: USGS
0206711_100_LOCUS  HALEYALDRICH\ACORTINA
JULY 2025
SITE COORDINATES:
PROJECT LOCUS
GRANBY PUBLIC SCHOOLS - TURF FIELD AND TRACK
50 NORTH GRANBY ROAD
GRANBY, CT

Page 139

FIGURE 2
SITE AND SUBSURFACE
EXPLORATION LOCATION PLAN
   SCALE: 
DESIGNATION AND APPROXIMATE LOCATION OF
GEOPROBE PERFORMED BY G&M SUBSURFACE
FROM 23 TO 25 JUNE 2025 AND OBERSVED BY
HALEY & ALDRICH, INC.
BASE PLAN OBTAINED FROM DRAWING NO. L.2.A
TITLED "SITE GRADING PLAN" PREPARED BY
CR3 LLP AND DATED 16 JANUARY 2013.
ELEVATIONS REFERENCE THE NORTH
AMERICAN VERTICAL DATUM OF 1988 (NAVD 88).
GRANBY PUBLIC SCHOOLS - TURF FIELD AND TRACK
GRANBY, CONNECTICUT
1" = 40'
JULY 2025
NOTES
1.
LEGEND
GP-01
GP-01
GP-02
GP-03
GP-04
GP-05
GP-06
GP-07
GP-08
GP-09
GP-10
GP-11
GP-12
GP-13
GP-14
GP-15
GP-16
GP-17
GP-18
GP-19
GP-20
GP-21
GP-22
GP-23
GP-24
GP-25
GP-26
GP-27
DESIGNATION AND APPROXIMATE LOCATION OF
GEOPROBE PERFORMED BY SEABOARD DRILLING
ON 20 OCTOBER 2022 AND OBSERVED BY HALEY &
ALDRICH, INC.
HA-1
HA-5
HA-1
HA-6
HA-3
HA-2
HA-4
HA-7
2.
N
AREA OF ADDITIONAL
EXCAVATION
REQUIRED UP TO 10
FT DEPTH

Page 140

APPENDIX A 
Previous Geoprobe Logs 

Page 141

IDENTIFICATION AND DESCRIPTION OF SUBSURFACE MATERIALS 
I 
SOIL 
Soil description on logs of subsurface explorations are based on 
Standard Penetration Test results, visual-manual examination of exposed 
soil and soil samples, and the results of laboratory tests on selected 
samples. The criteria, descriptive terms and definitions are as follows: 
DENSITY OR CONSISTENCY 
Penetration Penetration 
Density of Resistance Consistency of Resistance 
Cohesionless Soils (Blows �er ft.) Cohesive Soils (Blows �er ft.) 
Very Loose 0-4 Very Soft 0-2 
Loose 5-10 Soft 3-4 
Medium 11-30 Medium 5-8 
Dense 31-50 Stiff 9-15 
Very Dense over 50 Very Stiff 16-30 
Hard over 30 
PENETRATION RESISTANCE 
Standard Penetration Test (ASTM D-1586) - Number of blows required to 
drive a standard 2 in. O.D. split spoon sampler 1 ft. with a 140 lb. weight 
falling freely through 30 in. 
COLOR: Basic colors and combinations: black, brown, gray, 
yellow-brown, etc. 
U.S. Standard Series Seive 
12" 3" 3/4" 
I
I Gravel Boulders Cobbles 
I I Coarse Fine 
4 
I 
I 
SUPPLEMENTAL SOIL TERMINOLOGY: 
Laminae 
Parting 
Seam 
Layer 
Stratum 
Pocket 
Lens 
Occasional 
Frequent 
I nterbedded 
Varved 
Mottled 
- 0 to 1/16 in. thick (cohesive) 
- 0 to 1/16 in. thick (granular) 
- 1/16101/2 in. thick 
- 1/2 to 12 in. thick 
- > 12 in. thick 
- Small, erratic deposit less than 12 in. size 
- Lenticular deposit larger than a pocket 
- One or less per 12 in. of thickness 
- More than one per 12 in. of thickness 
- Alternating soil layers of differing composition 
- Alternating thin seams of silt and clay 
- Variation of color 
GEOLOGIC INTERPRETATION 
Deposit type - GLACIAL TILL, ALLUVIUM, FILL ..... 
The natural soils are identified by criteria of Unified Soil Classification 
System (USCS), with appropriate group symbol in parenthesis for each 
soil description. Fill materials may not be classified by USCS criteria. 
Clear Square Sieve Openings 
10 40 200 
Sand I I I Silts and Clays Coarse Medium Fine I I 
l 305 mm 76 mm 19 mm 4.75 mm 2.00 mm 0.43 mm 0.074 mm r-:t---------------------------------------------------------------1 N 0 UNIFIED SOIL CLASSIFICATION SYSTEM "' 2 1--------------------------------"Ti----,----,1--------------------------I N MAJOR DIVISIONS Group Graphic TYPICAL NAMES 
� Symbol Symbol z l---------,-------------r-------------..L-,--!,.-.,....,..---'--------------------------1 
0 
'3 
0:: ::::, CJ)m ::::, 
z 
0 
Coarse grained 
soils: 
more than half 
is larger 
than number 
200 sieve 
Gravels 
More than half 
of coarse 
fraction is larger 
than number 4 
sieve 
Sands 
Gravels with 
little or no fines 
Gravels with 
over 12% fines 
Sands with little 
or no fines 
Sands with over 
I 
Well graded gravels, gravel-sand mixtures 
Poorly graded gravels, gravel-sand mixtures 
Silty gravels, poorly graded gravel-sand-silt mixtures 
GC 7; Clayey gravels, poorly graded gravel-sand-clay mixtures 
SW � � Well graded sands, gravelly sands 
SP Poorly graded sands, gravelly sands 
SM I 11 I I 11 I Silty sands, poorly graded sand-silt mixtures -
o:: Clayey sands, poorly graded sand-clay mixtures '31---------+-----------'-----------------li--+...,,....,!---------------------------I 
More than half 
of coarse 
fraction is 
smaller than 
number 4 siev 12% fines SC �� '-- -
� ML I I Inorganic silts and very fine sands, rock flour, silly or clayey fine w Silts and Clays sands or clayey silts with slight plasticity 
� CL I// J Inorganic clays of low to medium plasticity, gravelly clays, sandy 
o::::::, 
Fined-grained ·II, clays, silty clays, lean clays 
soils: Liquid limit 50% or less 
� OL a Organic clays and organic silty clays of low plasticity CJ) more than half ui smaller than MH Inorganic silty, micaceous or diatomaceous fine sandy or silty soils, t'.j number 200 Silts and Clays elaStic silts � W, 
� 
sieve 
Liquid limit greater than 50% 
CH � Inorganic clays of high plasticity, fat clays 
...J �x w OH �X Organic clays of medium to high plasticity, organic sills 
u::1-----------'---------------------------ll--+"-,.,...,.---------------------------I 
� Highly organic soils PT � Peat and other highly organic soils ifil--------------------------------....ii....-.i.... ..... ---------------------------1 
...J w (.) 
::;; w 
S2 ., 
GENERAL NOTES 
1. Logs of subsurface explorations depict soil, rock and groundwater 
conditions only at the locations specified on the dates indicated. 
Subsurface conditions may vary at other locations and at other times. 
2. Water levels noted on the logs were measured at the times and under the 
conditions indicated. During test borings, these water levels could have been 
affected by the introduction of water into the borehole, extraction of tools on other 
procedures and thus may not reflect actual groundwater level at the test boring 
location. Groundwater level fluctuations may also occur as a result of variations in 
precipitation, temperature, season, tides, adjacent construction activities and 
pumping of water supply wells and construction dewatering systems. 
ROCK 
Rock descriptions noted on logs of subsurface explorations are based on 
visual-manual examination of exposed rock outcrops and core samples. 
The criteria, descriptive terms and definitions used are as follows: 
FIELD HARDNESS: A measure of resistance to scratching. 
Very Hard Cannot be scratched with a knife point 
or sharp pick. 
Hard Can be scratched with a knife point or 
sharp pick, only with difficulty. 
Moderately Hard Can be readily scratched with a knife 
point or pick. 
Medium Hard Can be grooved or gouged 1/16 in. deep 
with firm pressure on a knife point or 
sharp pick. 
Soft Can be grooved or gouged easily with a 
knife point or pick. 
Very Soft Can be carved with a knife and excavated 
with a pick point. 
WEATHERING: The action of organic and inorganic and chemical 
and physical processes resulting in alteration of 
color, texture and composition. 
Fresh-FR 
Slight-SL 
Moderate-MOD 
High-HIGH 
No visible sign of alteration, except 
perhaps slight discoloration on major 
discontinuity surfaces. 
Discoloration of rock material and 
discontinuity surfaces. All rock may be 
discolored and/or somewhat weaker 
than in its fresh condition. 
Less than half the rock material is decomposed 
and/or disintegrated to a soil. Some fresh or 
discolored rock is present as either a continuous 
framework or as corestones. 
More than half the rock material is 
decomposed and/or disintegrated to a soil. 
Fresh or discolored rock is present as either 
a discontinuous framework or as corestones. 
Complete-COMP All rock material is decomposed and/or 
disintegrated to soil. The original mass 
structure is largely intact. 
Residual Soil All rock material is converted to soil. The mass 
structure and material fabric are destroyed. 
There has been a large change of volume, but 
the material has not been significantly 
transported. 
COLOR: Basic colors and combinations: gray, light gray, brown, 
red-brown. 
TEXTURE: Size, shape and arrangements of constituents. 
Term Size 
Igneous 
>5 mm 
1 -5 mm 
< 1 mm 
Sedimentary 
>2 mm 
0.625 -2 mm 
< 0.625 mm 
Coarse-grained 
Medium-grained 
Fine-grained 
Aphanitic Individual grains invisible to the unaided eye. 
LITHOLOGY: Rock classification and modifiers; 
accepted formation names. 
DISCONTINUITIES: 
� 
Joint 
Definition 
Shear 
Fault 
Shear or Fault 
Zone 
A natural fracture along which no 
displacement has occurred. May occur 
in parallel groups called sets. 
A natural fracture along which 
displacement has occurred. Surface 
may be slickensided or striated. 
A natural fracture along which 
displacement has occurred. Usually 
lined with gouge and slickensides. 
Zone of fractured rock and gouge 
bordering the displacement plane. 
ORIENTATION/ATTITUDE: 
Term 
Horizontal 
Angle (degrees) 
0-5 
Low Angle 
Moderately Dipping 
High Angle 
6-35 
36-55 
56-85 
Vertical 
SPACING: 
Discontinuity Term 
Extremely Close 
Very Close 
Close 
Moderate 
Wide 
Very Wide 
Extremely Wide 
Bedding Term 
Extremely Thin 
Very Thin 
Thin 
Medium 
Thick 
Very Thick 
Extremely Thick 
86-100 
Inches 
< 3/4 
3/4 - 2.5 
2.5 -8 
8-24 
24 - 80 
80 - 240 
> 240
PERSISTENCE/CONTINUITY: APERTURE/GAP: 
Term 
Very Low 
Low 
Medium 
High 
Very High 
POROSITY: 
� 
Primary: 
Feet 
0-3 
3-10
10-35 
35-65 
> 65 
Term 
Very Tight 
Tight 
Partly Open 
Open 
Moderately Wide 
Wide 
Very Wide 
Extremely Wide 
Cavernous 
Distance 
<0.1mm 
0.1 mm-0.25mm 
0.25mm-0.5mm 
0.5mm-2.5mm 
2.5mm-1cm 
>1cm 
1cm-10cm 
10cm-1m 
> 1m 
Pre-depositional and depositional inter- and intra- granular, particle, or 
crystalline pores. 
Secondary: 
Solution features including pits, vugs, caverns, molds, and channels. 
Fracture features including joints, shears, faults, shrinkage and breccia fabrics. 
Term 
Micro 
Meso 
Mega 
Size 
< 0.0625 mm 
0.0625-4.0 mm 
4.0-256 mm 
SUBSURFACE EXPLORATION KEY 

Page 142

 0.0
5.0
 5.0
10.0
 10.0
15.0
G1
42
G2
36
G3
36
221.9
0.1
221.4
0.6
211.0
11.0
207.0
15.0
SW
SP
SM
SM
SP
-TRACK RUBBER-
-ASPHALT-
Gray to gray-brown well-graded SAND with gravel (SW), no structure, no
odor, dry
 - FILL -
Light red-brown to tan poorly-graded SAND (SP), no structure, no odor,
moist, trace organics
Light brown to tan SAND (SM), no structure, no odor, wet, wood fragments,
trace organics
Gray to gray-brown silty SAND (SM), no structure, no odor, moist, trace
wood fragments, trace organics
Light brown to tan poorly-graded SAND with gravel (SP), no structure, no
odor, wet
 - GLACIOFLUVIAL DEPOSITS -
BOTTOM OF EXPLORATION 15.0 FT
5
5
10
15
10
10
10
10
10
10
15
10
20
15
20
20
20
55
60
45
30
55
15
25
Elevation
Location
Time (hr.)
HA-1
Inside Diameter  (in.)
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
J. Shaw
G3
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 6620G
S - Splitspoon Sample
Finish
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Date
Push
Bottom
Filter Sand
1
H&A Rep.
0.0
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples
Datum
Type
Barrel
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
Drilling Equipment and Procedures
Start
15.0
Boring No.
-
G - Geoprobe
of Hole
None
Summary
Field Tests:
Drill Mud:
Hammer Weight  (lb) -Auto
1of
M. Kern
HA-1
Bit Type:
Bottom
-   Automatic Hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
Elapsed
222.0  (est.)
File No.
Sheet No.
0206711-000
Driller
Riser Pipe
See Plan
NAVD88
October 20, 2022
October 20, 2022
Client
Contractor Sea Board Drilling
Project
R.A.D. SPORTS
GRANBY HIGH SCHOOL TRACK, 54 N GRANBY RD, GRANBY CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY - COPY.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\0206711-GP.GPJ        Nov 7, 22
Depth (ft)
0
5
10
15
Sample No.
& Rec. (in.)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Density/consistency, color, GROUP NAME & SYMBOL,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 143

 0.0
5.0
 5.0
10.0
 10.0
15.0
G1
42
G2
24
G3
42
221.9
0.1
221.4
0.6
212.0
10.0
207.0
15.0
SW
SP
CL
SP
SP
SP
-TRACK RUBBER-
-ASPHALT-
Gray to gray-brown well-graded SAND with gravel (SW), no structure, no
odor, dry
Light brown to tan poorly-graded SAND with gravel (SP), no structure, no
odor, dry
Gray-brown sandy lean CLAY (CL), no structure, no odor, moist, trace
organics, trace wood, appears disturbed
Red-brown to light brown poorly-graded SAND (SP), no structure, no odor,
dry
Note: Upon advancing geoprobe sleeve, observed little to no resistance
between 5.4 to 5.8 ft.
 - FILL -
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
Light brown to tan poorly-graded SAND (SP), no structure, no odor, moist
-GLACIOFLUVIAL DEPOSITS-
BOTTOM OF EXPLORATION 15.0 FT
5 10
15
10
10
10
10
10
15
15
15
20
15
10
20
20
30
55
60
20
55
55
45
70
Elevation
Location
Time (hr.)
HA-2
Inside Diameter  (in.)
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
J. Shaw
G3
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 6620G
S - Splitspoon Sample
Finish
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Date
Push
Bottom
Filter Sand
1
H&A Rep.
0.0
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples
Datum
Type
Barrel
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
Drilling Equipment and Procedures
Start
15.0
Boring No.
-
G - Geoprobe
of Hole
None
Summary
Field Tests:
Drill Mud:
Hammer Weight  (lb) -Auto
1of
M. Kern
HA-2
Bit Type:
Bottom
-   Automatic Hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
Elapsed
222.0  (est.)
File No.
Sheet No.
0206711-000
Driller
Riser Pipe
See Plan
NAVD88
October 20, 2022
October 20, 2022
Client
Contractor Sea Board Drilling
Project
R.A.D. SPORTS
GRANBY HIGH SCHOOL TRACK, 54 N GRANBY RD, GRANBY CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY - COPY.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\0206711-GP.GPJ        Nov 7, 22
Depth (ft)
0
5
10
15
Sample No.
& Rec. (in.)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Density/consistency, color, GROUP NAME & SYMBOL,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 144

 0.0
5.0
 5.0
10.0
 10.0
15.0
G1
36
G2
36
G3
36
221.9
0.1
221.4
0.6
212.5
9.5
212.0
10.0
207.0
15.0
SW
SP
SP
SP
SM
SP
-TRACK RUBBER-
-ASPHALT-
Gray to gray-brown well-graded SAND with gravel (SW), no structure, no
odor, dry
Light brown to tan poorly-graded SAND (SP), no structure, no odor, dry
Light brown to brown poorly-graded SAND (SP), no structure, no odor, dry
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
-FILL-
Light brown silty SAND (SM), no structure, no odor, dry
Light brown to tan poorly-graded SAND (SP), no structure, no odor, moist
 - GLACIOFLUVIAL DEPOSITS -
BOTTOM OF EXPLORATION 15.0 FT
5 10
10
10
10
10
15
15
15
15
20
20
20
20
20
30
55
55
55
55
40
55
40
Elevation
Location
Time (hr.)
HA-3
Inside Diameter  (in.)
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
J. Shaw
G3
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 6620G
S - Splitspoon Sample
Finish
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Date
Push
Bottom
Filter Sand
1
H&A Rep.
0.0
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples
Datum
Type
Barrel
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
Drilling Equipment and Procedures
Start
15.0
Boring No.
-
G - Geoprobe
of Hole
None
Summary
Field Tests:
Drill Mud:
Hammer Weight  (lb) -Auto
1of
M. Kern
HA-3
Bit Type:
Bottom
-   Automatic Hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
Elapsed
222.0  (est.)
File No.
Sheet No.
0206711-000
Driller
Riser Pipe
See Plan
NAVD88
October 20, 2022
October 20, 2022
Client
Contractor Sea Board Drilling
Project
R.A.D. SPORTS
GRANBY HIGH SCHOOL TRACK, 54 N GRANBY RD, GRANBY CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY - COPY.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\0206711-GP.GPJ        Nov 7, 22
Depth (ft)
0
5
10
15
Sample No.
& Rec. (in.)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Density/consistency, color, GROUP NAME & SYMBOL,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 145

 0.0
5.0
 5.0
10.0
 10.0
15.0
G1
30
G2
12
G3
42
221.9
0.1
221.4
0.6
209.0
13.0
207.0
15.0
SW
SP
SP
SP
SP
SM
-TRACK RUBBER-
-ASPHALT-
Gray to gray-brown well-graded SAND with gravel (SW), no structure, no
odor, dry
Light brown poorly-graded SAND (SP), no structure, no odor, dry
Light brown to red-brown poorly-graded SAND (SP), no structure, no odor,
dry
Note: Upon advancing geoprobe sleeve, observed little to no resistance
between 5.4 to 5.8 ft.
 - FILL -
Light red-brown poorly graded SAND (SP), no structure, no odor, dry,
pockets of dark brown organics, occasional brick specks, appears
disturbed
Light brown poorly-graded SAND with gravel (SP), no structure, no odor,
dry
Light brown silty SAND (SM), no structure, no odor, dry
 - GLACIOFLUVIAL DEPOSITS -
BOTTOM OF EXPLORATION 15.0 FT
5
5
10
10
10
10
10
15
15
10
15
20
20
20
20
20
20
55
55
55
70
50
40 40
Elevation
Location
Time (hr.)
HA-4
Inside Diameter  (in.)
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
J. Shaw
G3
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 6620G
S - Splitspoon Sample
Finish
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Date
Push
Bottom
Filter Sand
1
H&A Rep.
0.0
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples
Datum
Type
Barrel
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
Drilling Equipment and Procedures
Start
15.0
Boring No.
-
G - Geoprobe
of Hole
None
Summary
Field Tests:
Drill Mud:
Hammer Weight  (lb) -Auto
1of
M. Kern
HA-4
Bit Type:
Bottom
-   Automatic Hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
Elapsed
222.0  (est.)
File No.
Sheet No.
0206711-000
Driller
Riser Pipe
See Plan
NAVD88
October 20, 2022
October 20, 2022
Client
Contractor Sea Board Drilling
Project
R.A.D. SPORTS
GRANBY HIGH SCHOOL TRACK, 54 N GRANBY RD, GRANBY CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY - COPY.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\0206711-GP.GPJ        Nov 7, 22
Depth (ft)
0
5
10
15
Sample No.
& Rec. (in.)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Density/consistency, color, GROUP NAME & SYMBOL,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 146

 0.0
5.0
 5.0
10.0
G1
36
G2
24
221.9
0.1
221.4
0.6
212.0
10.0
SW
SP
SP
SM
-TRACK RUBBER-
-ASPHALT-
Gray to gray-brown well-graded SAND with gravel (SW), no structure, no
odor, dry
Light brown poorly-graded SAND with gravel (SP), no structure, no odor,
moist
Note: Upon advancing geoprobe sleeve, observed little to no resistance
between 2.4 to 2.6 ft.
-FILL-
Light brown to red-brown poorly-graded SAND (SP), no structure, no odor,
moist
Brown poorly-graded SAND (SM), no structure, no odor, moist, bottom 2 in.
wood, dark lenses of organics, possible former Topsoil/Loess horizon,
disturbed
BOTTOM OF EXPLORATION 10.0 FT
5
5
10
10
10
10
15
15
10
20
20
20
10
55
50
55
50 30
Elevation
Location
Time (hr.)
HA-5
Inside Diameter  (in.)
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
J. Shaw
G2
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 6620G
S - Splitspoon Sample
Finish
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Date
Push
Bottom
Filter Sand
1
H&A Rep.
0.0
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples
Datum
Type
Barrel
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
Drilling Equipment and Procedures
Start
15.0
Boring No.
-
G - Geoprobe
of Hole
None
Summary
Field Tests:
Drill Mud:
Hammer Weight  (lb) -Auto
1of
M. Kern
HA-5
Bit Type:
Bottom
-   Automatic Hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
Elapsed
222.0  (est.)
File No.
Sheet No.
0206711-000
Driller
Riser Pipe
See Plan
NAVD88
October 20, 2022
October 20, 2022
Client
Contractor Sea Board Drilling
Project
R.A.D. SPORTS
GRANBY HIGH SCHOOL TRACK, 54 N GRANBY RD, GRANBY CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY - COPY.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\0206711-GP.GPJ        Nov 7, 22
Depth (ft)
0
5
10
Sample No.
& Rec. (in.)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Density/consistency, color, GROUP NAME & SYMBOL,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 147

 0.0
5.0
 5.0
10.0
 10.0
15.0
G1
42
G2
36
G3
30
221.9
0.1
221.4
0.6
207.0
15.0
SW
SP
SM
SP
SP
-TRACK RUBBER-
-ASPHALT-
Gray to gray-brown well-graded SAND with gravel (SW), no structure, no
odor, dry
Light brown poorly-graded SAND with gravel (SP), no structure, no odor,
dry
Light brown to tan silty SAND (SM), no structure, no odor, moist,
occasional dark brown organic lenses
Brown to tan poorly-graded SAND (SP), no structure, no odor, moist,
bottom 5 in. wood
 - FILL-
Light brown to tan poorly-graded SAND (SP), no structure, no odor, moist,
trace organic lenses, trace brick particles, block of wood (3 in. length) in
middle of sample
BOTTOM OF EXPLORATION 15.0 FT
5
5
10
10
10
10
10
10
15
15
15
15
20
20
20
20
20
55
50
25
50
55
30
5
Elevation
Location
Time (hr.)
HA-6
Inside Diameter  (in.)
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
J. Shaw
G3
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 6620G
S - Splitspoon Sample
Finish
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Date
Push
Bottom
Filter Sand
1
H&A Rep.
0.0
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples
Datum
Type
Barrel
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
Drilling Equipment and Procedures
Start
10.0
Boring No.
-
G - Geoprobe
of Hole
None
Summary
Field Tests:
Drill Mud:
Hammer Weight  (lb) -Auto
1of
M. Kern
HA-6
Bit Type:
Bottom
-   Automatic Hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
Elapsed
222.0  (est.)
File No.
Sheet No.
0206711-000
Driller
Riser Pipe
See Plan
NAVD88
October 20, 2022
October 20, 2022
Client
Contractor Sea Board Drilling
Project
R.A.D. SPORTS
GRANBY HIGH SCHOOL TRACK, 54 N GRANBY RD, GRANBY CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY - COPY.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\0206711-GP.GPJ        Nov 7, 22
Depth (ft)
0
5
10
15
Sample No.
& Rec. (in.)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Density/consistency, color, GROUP NAME & SYMBOL,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 148

 0.0
5.0
 5.0
10.0
 10.0
15.0
G1
42
G2
36
G3
42
221.9
0.1
221.4
0.6
221.0
1.0
215.0
7.0
207.0
15.0
SW
SP
SP
SP
-TRACK RUBBER-
-ASPHALT-
Gray to gray-brown well-graded SAND with gravel (SW), no structure, no
odor, dry
 - FILL -
Light brown to brown poorly-graded SAND (SP), no structure, no odor, dry,
trace brick
 - FILL -
Tan to light red-brown poorly-graded SAND with gravel (SP), no structure,
no odor, dry
 - GLACIOFLUVIAL DEPOSITS -
Light red-brown poorly-graded SAND (SP), no structure, no odor, dry
BOTTOM OF EXPLORATION 15.0 FT
5
5
10
10
10
10
15
20
20
20
55
55
65
100
Elevation
Location
Time (hr.)
HA-7
Inside Diameter  (in.)
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
J. Shaw
G3
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 6620G
S - Splitspoon Sample
Finish
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Date
Push
Bottom
Filter Sand
1
H&A Rep.
0.0
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples
Datum
Type
Barrel
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
Drilling Equipment and Procedures
Start
15.0
Boring No.
-
G - Geoprobe
of Hole
None
Summary
Field Tests:
Drill Mud:
Hammer Weight  (lb) -Auto
1of
M. Kern
HA-7
Bit Type:
Bottom
-   Automatic Hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
Elapsed
222.0  (est.)
File No.
Sheet No.
0206711-000
Driller
Riser Pipe
See Plan
NAVD88
October 20, 2022
October 20, 2022
Client
Contractor Sea Board Drilling
Project
R.A.D. SPORTS
GRANBY HIGH SCHOOL TRACK, 54 N GRANBY RD, GRANBY CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY - COPY.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\0206711-GP.GPJ        Nov 7, 22
Depth (ft)
0
5
10
15
Sample No.
& Rec. (in.)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Density/consistency, color, GROUP NAME & SYMBOL,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 149

APPENDIX B 
Recent Geoprobe Logs 

Page 150

 0.0
5.0
 5.0
10.0
G-1
44
G-2
30
-CRUSHED STONE-
Light brown poorly-graded SAND (SP), no structure, no odor, dry
- GLACIOFLUVIAL DEPOSITS -
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
BOTTOM OF EXPLORATION 10.0 FT
Note: Exploration backfilled upon completion.
222.5
0.5
213.0
10.0
SP
SP
5
5
20
5
50
30
20
55
5
5
C. Cravinho
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
10.0
Elevation
Location
GP-01
Time (hr.)
GP-01
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G2
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
23 June 2025
- - -
-
G - Geoprobe
23 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
223.0  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ      18 Jul 25
Depth (ft)
0
5
10
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 151

 0.0
5.0
 5.0
10.0
G-1
38
G-2
33
-CRUSHED STONE-
Dark brown silty SAND (SM), no structure, no odor, dry
 - FILL -
Light brown poorly-graded SAND (SP), no structure, no odor, dry
 - GLACIOFLUVIAL DEPOSITS -
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
BOTTOM OF EXPLORATION 10.0 FT
Note: Exploration backfilled upon completion.
222.0
0.5
221.0
1.5
212.5
10.0
SM
SP
SP
10
5
5
10
20
5
30
50
40
30
20
45
20
5
5
C. Cravinho
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
10.0
Elevation
Location
GP-02
Time (hr.)
GP-02
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G2
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
23 June 2025
- - -
-
G - Geoprobe
23 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
222.5  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ        18 Jul 25
Depth (ft)
0
5
10
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 152

 0.0
5.0
 5.0
10.0
G-1
40
G-2
60
-CRUSHED STONE-
Tan to light brown poorly-graded SAND with silt (SP-SM), no structure, no
odor, dry
-FILL-
Light brown sandy SILT (ML), no structure, no odor, dry, occasional dark
soil lense, appears to be fill or former topsoil/loess soil horizon
-GLACIOFLUVIAL DEPOSITS-
BOTTOM OF EXPLORATION 10.0 FT
Note: Exploration backfilled upon completion.
222.5
0.5
218.0
5.0
215.5
7.5
213.0
10.0
SP-
SM
ML
5 20 45
10
20
30
10
60
C. Cravinho
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
10.0
Elevation
Location
GP-03
Time (hr.)
GP-03
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G2
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
23 June 2025
- - -
-
G - Geoprobe
23 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
223.0  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ        18 Jul 25
Depth (ft)
0
5
10
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 153

 0.0
5.0
 5.0
10.0
G-1
38
G-2
40
-CRUSHED STONE-
Dark brown silty SAND with gravel (SM), no structure, no odor, dry
 - FILL -
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
 - GLACIOFLUVIAL DEPOSITS -
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
BOTTOM OF EXPLORATION 10.0 FT
Note: Exploration backfilled upon completion.
221.5
0.5
219.0
3.0
212.0
10.0
SM
SP
SP
5 10
5
5
10
20
20
25
50
50
30
20
20
20
5
5
C. Cravinho
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
10.0
Elevation
Location
GP-04
Time (hr.)
GP-04
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G2
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
23 June 2025
- - -
-
G - Geoprobe
23 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
222.0  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ        18 Jul 25
Depth (ft)
0
5
10
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 154

 0.0
5.0
 5.0
10.0
G-1
39
G2
40
-CRUSHED STONE-
Dark brown silty SAND with gravel (SM), no structure, no odor, dry, trace
organic wood material
 - FILL -
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
 - GLACIOFLUVIAL DEPOSITS -
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
BOTTOM OF EXPLORATION 10.0 FT
Note: Exploration backfilled upon completion.
222.5
0.5
221.5
1.5
213.0
10.0
SM
SP
SP
5
5
10
5
5
10
20
20
25
50
45
30
20
20
20
5
5
C. Cravinho
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
10.0
Elevation
Location
GP-05
Time (hr.)
GP-05
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G2
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
23 June 2025
- - -
-
G - Geoprobe
23 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
223.0  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ        18 Jul 25
Depth (ft)
0
5
10
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 155

 0.0
5.0
 5.0
10.0
G-1
39
G-2
35
-CRUSHED STONE-
Light brown poorly-graded SAND with silt (SP-SM), no structure, no odor,
dry
 - GLACIOFLUVIAL DEPOSITS -
Light brown poorly-graded SAND (SP), no structure, no odor, dry
BOTTOM OF EXPLORATION 10.0 FT
Note: Exploration backfilled upon completion.
222.5
0.5
213.0
10.0
SP-
SM
SP
5
5
20
20
45
40
20
35
10
C. Cravinho
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
10.0
Elevation
Location
GP-06
Time (hr.)
GP-06
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G2
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
23 June 2025
- - -
-
G - Geoprobe
24 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
223.0  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ        18 Jul 25
Depth (ft)
0
5
10
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 156

 0.0
5.0
 5.0
10.0
G-1
34
G-2
60
-CRUSHED STONE-
Dark brown silty SAND with gravel (SM), no structure, no odor, dry
 - FILL -
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
 - GLACIOFLUVIAL DEPOSITS -
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
BOTTOM OF EXPLORATION 10.0 FT
Note: Exploration backfilled upon completion.
222.5
0.5
222.0
1.0
213.0
10.0
SM
SP
SP
5 10
5
5
10
5
5
25
55
45
30
30
45
20
5
C. Cravinho
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
10.0
Elevation
Location
GP-07
Time (hr.)
GP-07
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G2
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
23 June 2025
- - -
-
G - Geoprobe
23 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
223.0  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ        18 Jul 25
Depth (ft)
0
5
10
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 157

 0.0
5.0
 5.0
10.0
G-1
36
G-2
30
-CRUSHED STONE-
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
 - GLACIOFLUVIAL DEPOSITS -
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
BOTTOM OF EXPLORATION 10.0 FT
Note: Exploration backfilled upon completion.
222.5
0.5
213.0
10.0
SP
SP
5 5
5
55
45
30
50
5
C. Cravinho
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
10.0
Elevation
Location
GP-08
Time (hr.)
GP-08
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G2
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
23 June 2025
- - -
-
G - Geoprobe
23 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
223.0  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ        18 Jul 25
Depth (ft)
0
5
10
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 158

 0.0
5.0
 5.0
10.0
G-1
41
G-2
33
-CRUSHED STONE-
Dark brown silty SAND with gravel (SM), no structure, no odor, dry
 - FILL -
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
 - GLACIOFLUVIAL DEPOSITS -
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
BOTTOM OF EXPLORATION 10.0 FT
Note: Exploration backfilled upon completion.
222.0
0.5
220.0
2.5
212.5
10.0
SM
SP
SP
5 10
5
5
10
5
5
25
55
55
30
30
30
20
5
5
C. Cravinho
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
10.0
Elevation
Location
GP-09
Time (hr.)
GP-09
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G2
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
23 June 2025
- - -
-
G - Geoprobe
23 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
222.5  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ        18 Jul 25
Depth (ft)
0
5
10
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 159

 0.0
5.0
 5.0
10.0
G-1
41
G-2
55
- TRACK RUBBER AND ASPHALT -
-CRUSHED STONE-
Gray to gray-brown silty SAND with gravel (SM), no structure, no odor, dry
 - FILL -
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
 - GLACIOFLUVIAL DEPOSITS -
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
BOTTOM OF EXPLORATION 10.0 FT
Note: Exploration backfilled upon completion.
222.9
0.1
222.5
0.5
222.0
1.0
213.0
10.0
SM
SP
SP
15 10
5
5
15
5
5
20
55
55
25
30
30
15
5
5
C. Cravinho
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
10.0
Elevation
Location
GP-10
Time (hr.)
GP-10
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G2
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
24 June 2025
- - -
-
G - Geoprobe
24 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
223.0  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ        18 Jul 25
Depth (ft)
0
5
10
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 160

 0.0
5.0
 5.0
10.0
G-1
40
G-2
50
- TRACK RUBBER AND ASPHALT -
-CRUSHED STONE-
Gray to gray-brown poorly-graded SAND with silt and gravel (SP-SM), no
structure, no odor, dry
 - FILL -
Red to red-brown poorly-graded SAND (SP), no structure, no odor, dry
 - GLACIOFLUVIAL DEPOSITS -
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
BOTTOM OF EXPLORATION 10.0 FT
Note: Exploration backfilled upon completion.
221.9
0.1
221.5
0.5
221.0
1.0
212.0
10.0
SP-
SM
SP
SP
10
5
15
10
5
15
5
5
20
45
55
30
30
30
10
5
5
C. Cravinho
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
10.0
Elevation
Location
GP-11
Time (hr.)
GP-11
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G2
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
24 June 2025
- - -
-
G - Geoprobe
24 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
222.0  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ        18 Jul 25
Depth (ft)
0
5
10
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 161

 0.0
5.0
 5.0
10.0
G-1
45
G-2
41
- TRACK RUBBER AND ASPHALT -
-CRUSHED STONE-
Gray to gray-brown poorly-graded SAND with silt and gravel (SP-SM), no
structure, no odor, dry
 - FILL -
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
 - GLACIOFLUVIAL DEPOSITS -
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
BOTTOM OF EXPLORATION 10.0 FT
Note: Exploration backfilled upon completion.
221.9
0.1
221.5
0.5
220.0
2.0
212.0
10.0
SP-
SM
SP
SP
15 20
5
5
15
5
5
25
55
45
15
30
40
10
5
5
C. Cravinho
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
10.0
Elevation
Location
GP-12
Time (hr.)
GP-12
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G2
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
24 June 2025
- - -
-
G - Geoprobe
24 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
222.0  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ        18 Jul 25
Depth (ft)
0
5
10
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 162

 0.0
5.0
 5.0
10.0
 10.0
15.0
G-1
46
G-2
38
G-3
42
- TRACK RUBBER AND ASPHALT -
-CRUSHED STONE-
Gray to gray-brown poorly-graded SAND with silt and gravel (SP-SM), no
structure, no odor, dry
Tan to light-brown silty SAND (SM), no structure, no odor, dry, frequent
pockets of dark brown organic soil
-FILL-
Brown silty SAND (SM), no structure, no odor, moist
Tan to light brown poorly-graded SAND (SP), no structure, no odor, moist
-GLACIOFLUVIAL DEPOSITS-
Brown silty SAND (SM), no structure, no odor, moist
Tan to light brown poorly-graded SAND (SP), no structure, no odor, moist
BOTTOM OF EXPLORATION 15.0 FT
Note: Exploration backfilled upon completion.
222.5
0.5
222.0
1.0
218.0
5.0
213.0
10.0
210.0
13.0
209.0
14.0
208.0
15.0
SP-
SM
SP
SM
SM
SP
SM
SP
15
5
20
5
5
5
5
15
5
5
5
40
25
55
50
20
40
20
30
15
30
20
40
30
40
20
10
5
20
40
20
40
C. Cravinho
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
15.0
Elevation
Location
GP-13
Time (hr.)
GP-13
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G3
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
24 June 2025
- - -
-
G - Geoprobe
24 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
223.0  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ        18 Jul 25
Depth (ft)
0
5
10
15
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test
 - FILL -
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
-FILL-

Page 163

 0.0
5.0
 5.0
10.0
G-1
43
G-2
40
- TRACK RUBBER AND ASPHALT -
-CRUSHED STONE-
Brown to red-brown poorly-graded SAND with gravel (SP), no structure, no
odor, dry
 - FILL -
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
Tan to light brown poorly-graded SAND (SP), no structure, no odor, moist
 - GLACIOFLUVIAL DEPOSITS -
Brown silty SAND (SM), no structure, no odor, moist
Tan to light brown poorly-graded SAND (SP), no structure, no odor, moist
BOTTOM OF EXPLORATION 10.0 FT
Note: Exploration backfilled upon completion.
223.9
0.1
223.5
0.5
220.0
4.0
216.0
8.0
215.5
8.5
214.0
10.0
SP
SP
SP
SM
SP
15 20
5
5
5
15
5
5
5
25
55
50
20
50
15
30
35
40
35
10
5
5
40
5
C. Cravinho
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
10.0
Elevation
Location
GP-14
Time (hr.)
GP-14
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G2
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
24 June 2025
- - -
-
G - Geoprobe
24 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
224.0  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ        18 Jul 25
Depth (ft)
0
5
10
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 164

 0.0
5.0
 5.0
10.0
G-1
44
G-2
39
- TRACK RUBBER AND ASPHALT -
-CRUSHED STONE-
Gray-brown to red-brown poorly-graded SAND with silt and gravel (SP-SM),
no structure, no odor, dry
 - FILL -
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
 - GLACIOFLUVIAL DEPOSITS -
BOTTOM OF EXPLORATION 10.0 FT
Note: Exploration backfilled upon completion.
223.9
0.1
223.5
0.5
220.0
4.0
214.0
10.0
SP-
SM
SP
SP
15 20
5
15
5
5
25
55
10
15
30
80
10
5
5
C. Cravinho
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
10.0
Elevation
Location
GP-15
Time (hr.)
GP-15
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G2
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
24 June 2025
- - -
-
G - Geoprobe
24 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
224.0  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ        18 Jul 25
Depth (ft)
0
5
10
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 165

 0.0
5.0
 5.0
10.0
 10.0
15.0
G-1
43
G-2
42
G-3
45
- TRACK RUBBER AND ASPHALT -
-CRUSHED STONE-
Gray-brown to red-brown poorly-graded SAND with silt and gravel (SP-SM),
no structure, no odor, dry
 - FILL -
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
 - GLACIOFLUVIAL DEPOSITS -
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
BOTTOM OF EXPLORATION 15.0 FT
Note: Exploration backfilled upon completion.
223.4
0.1
223.0
0.5
219.5
4.0
208.5
15.0
SP-
SM
SP
SP
SP
15 20
5
15
5
5
5
25
55
50
25
15
30
40
65
10
5
5
5
C. Cravinho
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
15.0
Elevation
Location
GP-16
Time (hr.)
GP-16
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G3
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
24 June 2025
- - -
-
G - Geoprobe
24 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
223.5  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ        18 Jul 25
Depth (ft)
0
5
10
15
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 166

 0.0
5.0
 5.0
10.0
G-1
40
G-2
35
- TRACK RUBBER AND ASPHALT -
-CRUSHED STONE-
Gray-brown to red-brown poorly-graded SAND with silt and gravel (SP-SM),
no structure, no odor, dry
 - FILL -
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
 - GLACIOFLUVIAL DEPOSITS -
BOTTOM OF EXPLORATION 10.0 FT
Note: Exploration backfilled upon completion.
223.4
0.1
223.0
0.5
219.5
4.0
213.5
10.0
SP-
SM
SP
SP
15 20
5
15
5
5
25
55
50
15
30
40
10
5
5
C. Cravinho
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
10.0
Elevation
Location
GP-17
Time (hr.)
GP-17
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G2
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
24 June 2025
- - -
-
G - Geoprobe
24 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
223.5  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ        18 Jul 25
Depth (ft)
0
5
10
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 167

 0.0
5.0
 5.0
10.0
G-1
40
G-2
42
- TRACK RUBBER AND ASPHALT -
-CRUSHED STONE-
Gray-brown to red-brown poorly-graded SAND with silt and gravel (SP-SM),
no structure, no odor, dry
 - FILL -
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
 - GLACIOFLUVIAL DEPOSITS -
BOTTOM OF EXPLORATION 10.0 FT
Note: Exploration backfilled upon completion.
221.9
0.1
221.5
0.5
218.0
4.0
212.0
10.0
SP-
SM
SP
SP
15 20
5
15
5
5
25
55
30
15
30
60
10
5
5
C. Cravinho
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
10.0
Elevation
Location
GP-18
Time (hr.)
GP-18
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G2
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
24 June 2025
- - -
-
G - Geoprobe
24 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
222.0  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ        18 Jul 25
Depth (ft)
0
5
10
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 168

 0.0
5.0
 5.0
10.0
G-1
46
G-2
40
- TRACK RUBBER AND ASPHALT -
-CRUSHED STONE-
Gray-brown to red-brown poorly-graded SAND with silt and gravel (SP-SM),
no structure, no odor, dry
 - FILL -
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry
 - GLACIOFLUVIAL DEPOSITS -
BOTTOM OF EXPLORATION 10.0 FT
Note: Exploration backfilled upon completion.
222.9
0.1
222.5
0.5
219.0
4.0
213.0
10.0
SP-
SM
SP
SP
15 20
5
15
5
5
25
55
50
15
30
40
10
5
5
C. Cravinho
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
10.0
Elevation
Location
GP-19
Time (hr.)
GP-19
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G2
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
24 June 2025
- - -
-
G - Geoprobe
24 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
223.0  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ        18 Jul 25
Depth (ft)
0
5
10
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 169

P
U
S
H
P
U
S
H
P
U
S
H
P
U
S
H
 0.0
5.0
 5.0
10.0
 10.0
15.0
 15.0
20.0
G1
G2
G3
G4
-TRACK RUBBER AND ASPHALT-
Dark gray to gray-brown poorly-graded SAND with silt and gravel (SP-SM),
no structure, no odor
Red-brown to tan poorly-graded SAND (SP), bedded, no odor, dry
 - FILL -
Dark brown silty SAND with gravel (SM), no structure, no odor, dry,
occasional irregular dark brown sandy SILT pocket (fill)
Red-brown to tan poorly-graded SAND (SP), bedded, no odor, dry, trace
clayey sand
 - GLACIOFLUVIAL DEPOSITS -
Tan silty SAND (SM), no structure, no odor, moist
BOTTOM OF EXPLORATION 20.0 FT
Note: Exploration backfilled upon completion.
221.7
0.3
210.0
12.0
209.0
13.0
205.0
17.0
202.0
20.0
SP-
SM
SP
SM
SP
SM
10
10
0
20
15
0
20
25
10
20
20
25
40
20
30
60
50
70
10
15
30
E. Robinson
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
20.0
Elevation
Location
GP-20
Time (hr.)
GP-20
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G4
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
25 June 2025
- - -
-
G - Geoprobe
25 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
222.0  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ        18 Jul 25
Depth (ft)
0
5
10
15
20
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 170

P
U
S
H
P
U
S
H
 0.0
5.0
 5.0
10.0
G1
G2
-TRACK RUBBER AND ASPHALT-
Dark gray to gray-brown poorly-graded SAND with silt and gravel (SP-SM),
no structure, no odor
 - FILL -
Red-brown to tan poorly-graded SAND (SP), bedded, no odor, dry
 - GLACIOFLUVIAL DEPOSITS -
BOTTOM OF EXPLORATION 10.0 FT
Note: Exploration backfilled upon completion.
221.6
0.4
221.2
0.8
212.0
10.0
SP-
SM
SP
10
5
20 20
20
20
25
20
50
10
E. Robinson
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
10.0
Elevation
Location
GP-21
Time (hr.)
GP-21
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G2
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
25 June 2025
- - -
-
G - Geoprobe
25 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
222.0  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ        18 Jul 25
Depth (ft)
0
5
10
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 171

P
U
S
H
P
U
S
H
 0.0
5.0
 5.0
10.0
G1
G2
-TRACK RUBBER AND ASPHALT-
Dark gray to gray-brown poorly-graded SAND with silt and gravel (SP-SM),
no structure, no odor
Red-brown to tan poorly-graded SAND (SP), bedded, no odor, dry
 - FILL -
Dark brown sandy SILT (ML) with dark brown organic soil pockets,
occasional wood pieces (from tree?)
-FILL-
BOTTOM OF EXPLORATION 10.0 FT
Note: Exploration backfilled upon completion.
221.6
0.4
217.0
5.0
212.0
10.0
SP-
SM
SP
ML
10 20
5
20
25
20
20
5
20
55
30
10
60
E. Robinson
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
10.0
Elevation
Location
GP-22
Time (hr.)
GP-22
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G2
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
25 June 2025
- - -
-
G - Geoprobe
25 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
222.0  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ        18 Jul 25
Depth (ft)
0
5
10
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 172

P
U
S
H
P
U
S
H
 0.0
5.0
 5.0
10.0
G1
G2
-TRACK RUBBER AND ASPHALT-
Dark gray and gray-brown poorly-graded SAND with silt and gravel (GW-
GC), no structure, no odor
 - FILL -
Red-brown to tan poorly-graded SAND with gravel (SP), bedded, no odor,
dry
 - GLACIOFLUVIAL DEPOSITS -
BOTTOM OF EXPLORATION 10.0 FT
Note: Exploration backfilled upon completion.
221.7
0.3
221.0
1.0
212.0
10.0
GW-
GC
SP
10
5
20
10
20
25
20
20
20
40
10
E. Robinson
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
10.0
Elevation
Location
GP-23
Time (hr.)
GP-23
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G2
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
25 June 2025
- - -
-
G - Geoprobe
25 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
222.0  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ        18 Jul 25
Depth (ft)
0
5
10
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 173

P
U
S
H
P
U
S
H
P
U
S
H
 0.0
5.0
 5.0
10.0
 10.0
15.0
G1
G2
G3
-TRACK RUBBER AND ASPHALT-
Dark gray to gray-brown poorly-graded SAND with silt and gravel (SP-SM),
no structure, no odor
 - FILL -
Red-brown to tan poorly-graded SAND with gravel (SP), bedded, no odor,
dry
 - GLACIOFLUVIAL DEPOSITS -
Red to red-brown poorly-graded SAND with gravel (SP), no structure, no
odor, dry
BOTTOM OF EXPLORATION 15.0 FT
Note: Exploration backfilled upon completion.
222.1
0.4
221.5
1.0
207.5
15.0
SP-
SM
SP
SP
10
5
20
10
20
20
20
25
20
40
100
10
E. Robinson
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
15.0
Elevation
Location
GP-24
Time (hr.)
GP-24
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G3
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
25 June 2025
- - -
-
G - Geoprobe
25 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
222.5  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ        18 Jul 25
Depth (ft)
0
5
10
15
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 174

P
U
S
H
P
U
S
H
P
U
S
H
 0.0
5.0
 5.0
10.0
 10.0
15.0
G1
G2
G3
-TRACK RUBBER AND ASPHALT-
Dark gray to gray-brown poorly-graded SAND with silt and gravel (SP-SM),
no structure, no odor
 - FILL -
Red-brown to tan poorly-graded SAND (SP), bedded, no odor, dry, trace
clayey sand, graded bedding coarse to fine sand
 - GLACIOFLUVIAL DEPOSITS -
BOTTOM OF EXPLORATION 15.0 FT
Note: Exploration backfilled upon completion.
222.2
0.3
221.5
1.0
207.5
15.0
SP-
SM
SP
10
0
20
0
20
10
20
40
20
50
10
E. Robinson
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
15.0
Elevation
Location
GP-25
Time (hr.)
GP-25
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G3
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
25 June 2025
- - -
-
G - Geoprobe
25 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
222.5  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ        18 Jul 25
Depth (ft)
0
5
10
15
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 175

P
U
S
H
P
U
S
H
 0.0
5.0
 5.0
10.0
G1
G2
Dark gray to gray-brown poorly-graded SAND with silt and gravel (SP-SM),
no structure, no odor
 - FILL -
Red-brown to tan poorly-graded SAND (SP), bedded, no odor, dry, trace
clayey sand, graded beds, coarse grain on top of fine grain
 - GLACIOFLUVIAL DEPOSITS -
BOTTOM OF EXPLORATION 10.0 FT
Note: Exploration backfilled upon completion.
221.5
1.0
212.5
10.0
SP-
SM
SP
10
0
20
0
20
10
20
40
20
50
10
E. Robinson
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
10.0
Elevation
Location
GP-26
Time (hr.)
GP-26
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G2
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
25 June 2025
- - -
-
G - Geoprobe
25 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
222.5  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ        18 Jul 25
Depth (ft)
0
5
10
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 176

P
U
S
H
P
U
S
H
 0.0
5.0
 5.0
10.0
G1
G2
Dark gray to gray-brown poorly-graded SAND with silt and gravel (SP-SM),
no structure, no odor
 - FILL -
Red-brown to tan poorly-graded SAND with gravel (SP), bedded, no odor,
dry
 - GLACIOFLUVIAL DEPOSITS -
Red-brown to tan poorly-graded SAND (SP), bedded, no odor, dry, trace
clayey sand
BOTTOM OF EXPLORATION 10.0 FT
Note: Exploration backfilled upon completion.
221.0
1.0
212.0
10.0
SP-
SM
SP
SP
10
5
0
20
10
0
20
20
10
20
25
40
20
40
50
10
E. Robinson
Casing
Casing:
PID Make & Model:
Hoist/Hammer:
Depth  (ft) to:
Sampler
Overburden  (ft)
Rock Cored  (ft)
of
Rig Make & Model:
Grout
Screen
Well Diagram
Geoprobe 7822DTG
Sheet No.
S - Splitspoon Sample
O - Open End Rod
T - Thin Wall Tube
U - Undisturbed Sample
File No.
10.0
Elevation
Location
GP-27
Time (hr.)
GP-27
Inside Diameter  (in.)
H&A Rep.
Plasticity:   N - Nonplastic   L - Low   M - Medium   H - High
Dry Strength:  N - None   L - Low   M - Medium   H - High   V - Very High
NAVD88
-
Date
Push
Bottom
Filter Sand
Dilatancy:  R - Rapid   S - Slow   N - None
Toughness:  L - Low   M - Medium   H - High
Cuttings
Not used
Samples G2
Datum
Type
Barrel
-
Water
Concrete
Hammer Fall  (in.)
Bentonite Seal
0.0
Finish
Drilling Equipment and Procedures
25 June 2025
- - -
-
G - Geoprobe
25 June 2025
of Hole
None
Boring No.
Driller
Summary
Field Tests:
1
Drill Mud:
Hammer Weight  (lb) -AUTO- See Plan
B. Wilson
Start
1
Bit Type:
Bottom
Winch   Automatic hammer
Time
Water Level Data
Note:   Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc.
Sample ID
1.5
of Casing
Boring No.
Geoprobe Spoon
-
Elapsed
0206711-001
Riser Pipe
†
 Note:  Maximum particle size is determined by direct observation within the limitations of sampler size.
222.0  (est.)
Client
Contractor G&M SUBSURFACE
Project
GRANBY PUBLIC SCHOOLS
GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT
GEOPROBE REPORT
Sampler Blows
per 6 in.
Sample
Depth (ft)
H&A-GEOPROBE-09    PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB    HA-TB+CORE+WELL-07-1.GDT     \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ        18 Jul 25
Depth (ft)
0
5
10
Sample No.
& Rec. (in.)
VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION
(Color, GROUP NAME, max. particle size
†
,
structure, odor, moisture, optional descriptions
GEOLOGIC INTERPRETATION)
Stratum
Change
Elev/Depth (ft)
USCS Symbol
Gravel Sand Field Test
% Fine
% Coarse
% Medium
% Fine
% Fines
Dilatancy
% Coarse
Toughness
Plasticity
Strength
Field Test

Page 177

GRANBY HIGH SCHOOL 
TRACK AND FIELD
January 26, 2026

Page 178

EXISTING SITE
GEOTECH REPORT
- Recommends full depth removal and 
replacement down to 5’ and up to 10’ in 
some areas. 
- Reconstruction of this manner is very 
difficult and would require full removal 
the entire facility, including turf, track, 
pavement, drainage, all utilities, shoring 
of light poles, shoring for bleachers, site 
security, and only would come with a 1 
year workmanship warranty

Page 179

PROPOSED SOLUTION 
POST TENSION CONCRETE 
TRACK AND FIELD
STRUCTURALLY SOUND
USED ON TRACKS, FIELDS, AND COURTS
CAN BE COMPLETED IN ONE SEASON
FULLY WARRANTED
50 YEAR STRUCTURAL WARRANTY

Page 180

CONSTRUCTION METHOD

Page 181

PROPOSED PLAN

Page 182

BASEBALL / MULTIPURPOSE FIELD

Page 183

BASEBALL / MULTIPURPOSE FIELD

Page 184

January
 
23,
 
2026
 
 
To
 
ensure
 
our
 
upcoming
 
CPPAC
 
meeting
 
is
 
as
 
productive
 
as
 
possible,
 
we
 
have
 
provided
 
answers
 
to
 
your
 
preliminary
 
list
 
of
 
questions
 
below
 
in
 
GREEN
.
 
 
 
Chris
 
Hulk,
 
Regional
 
Vice
 
President
 
for
 
New
 
England
 
from
 
Turf
 
Field,
 
will
 
be
 
joining
 
the
 
meeting
 
to
 
provide
 
further
 
information
 
and
 
details
 
for
 
the
 
turf
 
projects
 
proposed
 
for
 
GMHS.
 
General
 
/
 
All
 
Projects
 
Budgeting:
 
Do
 
the
 
most
 
recent
 
request
 
figures
 
include
 
contingencies
 
and/or
 
project
 
management
 
fees?
 
Please
 
see
 
this
 
pricing
 
summary
 
for
 
the
 
field
 
projects.
 
We
 
do
 
not
 
have
 
a
 
comprehensive
 
project
 
developed
 
for
 
GMHS,
 
so
 
this
 
is
 
not
 
available
 
at
 
this
 
time.
 
Recommended
 
Contingency
 
to
 
be
 
added:
 
8%–10%
 
for
 
design,
 
general
 
conditions,
 
and
 
construction
 
to
 
account
 
for
 
unknown
 
site
 
conditions.
 
This
 
does
 
not
 
include
 
project
 
management.
 
*Football&
 
Track
 
Field
  
 
 
*Stadium
 
Field
 
includes:
 
boys/girls
 
soccer,
 
boys/girls
 
lacrosse,
 
ultimate
 
frisbee,
 
football,
 
fieldhockey,
 
boys/girls
 
track&field,
 
cheerleading,
 
and
 
unified
 
sports)
 
Full
 
Site:
 
Visual
 
of
 
all
 
fields
 
proposed
.
 
 
LED
 
Lighting:
 
We’ve
 
discussed
 
potential
 
ROI
 
within
 
3–5
 
years.
 
Please
 
be
 
prepared
 
to
 
provide
 
2024–2025
 
high
 
school
 
energy
 
costs
 
(broken
 
down
 
by
 
quarter).
 
Are
 
the
 
lights
 
primarily
 
utilized
 
during
 
Q2
 
and
 
Q3?
 
With
 
regard
 
to
 
the
 
athletic
 
lights,
 
we
 
do
 
receive
 
a
 
separate
 
electric
 
bill
 
for
 
those
 
lights.
 
We
 
keep
 
track
 
of
 
the
 
electricity
 
data
 
usage,
 
and
 
in
 
reviewing
 
the
 
data,
 
the
 
most
 
expensive
 
months
 
are
 
September
 
through
 
December
 
and
 
then
 
April
 
to
 
June.
 
The
 
following
 
is
 
the
 
TOTAL
 
annual
 
usage
 
of
 
those
 
lights,
 
both
 
supply
 
and
 
delivery.
 
 
 
FY
 
2025
 
-
 
$17,940
 
FY
 
2024-
 
$15,540
 
FY
 
2023
 
-
 
$17,120
 
FY
 
2022
 
-
 
$16,020
 
 
 
The
 
four-year
 
average
 
is
 
$16,655.
 
Safety
 
Netting:
 
This
 
was
 
included
 
in
 
the
 
original
 
quote—what
 
were
 
the
 
considerations
 
for
 
its
 
removal
 
in
 
the
 
latest
 
request?
 
This
 
was
 
suggested
 
as
 
an
 
add-on,
 
it
 
is
 
not
 
there
 
because
 
we
 
are
 
keeping
 
costs
 
down.
 
The
 
only
 
"add-on"
 
requested
 
is
 
LED
 
lights.
 
We
 
put
 
this
 
as
 
a
 
separate
 
line
 
item
 
just
 
because
 
of
 
the
 
costs.
 
However,
 
it
 
is
 
strongly
 
recommended
 
by
 
the
 
Field
 
Turf
 
professional
 
that
 
by
 
adding
 
netting,
 
the
 
track
 
and
 
field
 
can
 
be
 
used
 
at
 
the
 
same
 
time.
 

Page 185

 
Exclusions:
 
Please
 
be
 
prepared
 
to
 
review
 
the
 
FieldTurf
 
"project
 
exclusions"
 
list
 
with
 
the
 
committee
 
to
 
discuss
 
potential
 
impacts.
 
EXCLUSIONS:
 
➢
 
Any
 
costs
 
associated
 
with
 
necessary
 
charges
 
relating
 
to
 
the
 
delineation
 
of
 
the
 
field
 
➢
 
The
 
supply
 
of
 
manholes
 
or
 
clean-outs
 
or
 
grates,
 
or
 
the
 
supply
 
of
 
the
 
manhole
 
covers
 
outside
 
of
 
the
 
field
 
area
 
➢
 
Any
 
alteration
 
or
 
deviation
 
from
 
specifications
 
involving
 
extra
 
costs,
 
which
 
alteration
 
or
 
deviation
 
will
 
be
 
provided
 
only
 
upon
 
executed
 
change
 
orders,
 
and
 
will
 
become
 
an
 
extra
 
charge
 
over
 
and
 
above
 
the
 
offered
 
price
 
➢
 
Soil
 
stabilization
 
or
 
remediation
 
of
 
any
 
type
 
➢
 
Rock
 
excavation
 
or
 
ledge
 
removal
 
➢
 
Offsite
 
disposal
 
of
 
generated
 
spoils
 
other
 
than
 
topsoil
 
➢
 
Taxes
 
➢
 
Excavation
 
or
 
disposal
 
of
 
unsuitable
 
or
 
contaminated
 
soils
 
➢
 
Site
 
security,
 
including
 
security
 
fencing
 
➢
 
Once
 
subgrade
 
has
 
been
 
established,
 
a
 
proof
 
roll
 
will
 
be
 
performed
 
to
 
ensure
 
structural
 
stability
 
of
 
the
 
soils;
 
if
 
unsuitable
 
soils
 
are
 
encountered,
 
a
 
price
 
to
 
remedy
 
these
 
areas
 
can
 
be
 
negotiated
 
based
 
on
 
recommended
 
methods
 
per
 
the
 
project
 
Engineer
 
➢
 
Testing
 
or
 
Inspection
 
Fees
 
➢
 
Site
 
restoration,
 
sodding,
 
landscaping,
 
or
 
grow-
 
in
 
beyond
 
disturbed
 
areas
 
➢
 
Repair
 
or
 
resurfacing
 
existing
 
asphalt
 
parking
 
lot
 
if
 
damaged
 
by
 
truck
 
traffic
 
➢
 
Bond
 
fees
 
and
 
non-local
 
permits
 
Baseball
 
&
 
Softball
 
Fields
 
(and
 
multipurpose
 
outfield
 
for
 
soccer,
 
lacrosse,
 
and
 
field
 
hockey
 
as
 
needed)
 
Scope
 
&
 
Design:
 
Please
 
provide
 
site
 
plans,
 
location
 
for
 
the
 
multi-purpose
 
field,
 
and
 
details
 
on
 
expected
 
student
 
population
 
usage.
 
Please
 
see
 
the
 
project
 
proposal
 
linked
 
here
.
 
We
 
can
 
not
 
go
 
to
 
RFP
 
for
 
a
 
true
 
project
 
rendering
 
until
 
a
 
vote
 
is
 
passed.
 
 
Considering
 
field
 
use
 
for
 
Junior
 
Varsity
 
and
 
Varsity
 
teams
 
for
 
baseball
 
and
 
softball,
 
and
 
additional
 
use
 
for
 
soccer
 
and
 
other
 
sports
 
for
 
Freshman
 
games,
 
we
 
anticipate
 
234
 
student
 
athletes
 
to
 
use
 
the
 
stadium
 
field
 
and
 
the
 
baseball/multipurpose
 
field
 
each
 
year
 
over
 
the
 
life
 
of
 
the
 
field
 
.(including
 
boys/girls
 
soccer,
 
boys/girls
 
lacrosse,
 
ultimate
 
frisbee,
 
football,
 
fieldhockey,
 
boys/girls
 
track&field,
 
cheerleading
 
and
 
unified
 
sports)
 
In
 
addition,
 
there
 
is
 
interest
 
from
 
Rovers,
 
Little
 
League,
 
and
 
men/women's
 
recreational
 
leagues
 
to
 
use
 
the
 
fields.
 
 

Page 186

We
 
have
 
an
 
overall
 
rendering
 
in
 
2D
 
for
 
the
 
site
 
included
 
in
 
the
 
project
 
proposal
 
linked
 
here
.
 
If
 
we
 
engage
 
in
 
an
 
initial
 
'pre-construction'
 
/
 
design
 
agreement
 
with
 
Field
 
Turf,
 
we
 
can
 
include
 
3D
 
renderings
 
of
 
the
 
fields.
 
That
 
cost
 
would
 
be
 
approximately
 
$29.5k
 
and
 
is
 
attached
 
as
 
a
 
CREC
 
Co
 
Op
 
Proposal.
 
An
 
example
 
of
 
a
 
3D
 
rendering
 
can
 
be
 
viewed
 
here
.
 
Field
 
Composition:
 
What
 
were
 
the
 
considerations
 
regarding
 
upgrading
 
current
 
fields
 
versus
 
new
 
construction?
 
Was
 
a
 
hybrid
 
option
 
(dirt
 
infield/turf
 
outfield)
 
evaluated?
 
Is
 
there
 
a
 
comparative
 
cost
 
to
 
revive
 
the
 
current
 
fields
 
with
 
new
 
infields
 
and
 
dugouts?
 
 
The
 
typical
 
cost
 
to
 
do
 
a
 
new
 
turf
 
field
 
versus
 
renovating
 
a
 
grass
 
field
 
properly
 
is
 
about
 
20%
 
more.
 
 
The
 
main
 
driving
 
factor
 
used
 
by
 
industry
 
professionals
 
is
 
the
 
cost
 
per
 
hour
 
of
 
use.
 
Grass
 
fields
 
are
 
intended
 
to
 
be
 
used
 
10-12
 
hours
 
per
 
week
 
so
 
that
 
they
 
can
 
be
 
maintained
 
and
 
preserved
 
at
 
a
 
maintainable
 
level.
 
As
 
indicated
 
in
 
the
 
2008
 
report
 
(
section
 
1
,
 
section
 
2
,
 
section
 
3
),
 
this
 
is
 
not
 
possible
 
with
 
the
 
needs
 
of
 
our
 
current
 
baseball
 
field.
 
A
 
turf
 
field,
 
especially
 
with
 
lights,
 
allows
 
40+
 
hours
 
of
 
use
 
a
 
week.
 
This
 
then
 
opens
 
it
 
up
 
to
 
use
 
by
 
Granby
 
town
 
teams,
 
club
 
teams,
 
adult
 
leagues,
 
etc,
 
that
 
are
 
not
 
provided
 
access
 
to
 
our
 
grass
 
fields
 
now.
 
So
 
the
 
cost
 
per
 
hour
 
of
 
use
 
goes
 
down
 
to
 
about
 
1/4
 
of
 
the
 
cost
 
of
 
a
 
grass
 
field
 
when
 
you
 
do
 
the
 
life
 
span
 
analysis.
 
 
Clay
 
fields
 
are
 
not
 
recommended.
 
Reports
 
from
 
districts
 
that
 
have
 
clay
 
are
 
dissatisfied
 
due
 
to
 
tracking
 
and
 
marks
 
in
 
the
 
field
 
that
 
look
 
terrible
 
and
 
are
 
very
 
hard
 
to
 
repair.
 
(Note:
 
Connecticut
 
Interscholastic
 
Athletic
 
Conference)
 
Data
 
and
 
regional
 
athletic
 
trends
 
suggest
 
that
 
approximately
 
10%
 
to
 
15%
 
of
 
Connecticut
 
high
 
school
 
baseball
 
fields
 
are
 
currently
 
synthetic
 
turf.)
 
We
 
can
 
not
 
find
 
this
 
data
 
point
 
confirmed
 
anywhere.
 
In
 
speaking
 
with
 
both
 
Harford
 
area
 
superintendents
 
and
 
turf
 
field
 
professionals,
 
they
 
report
 
a
 
significant
 
increase
 
in
 
the
 
number
 
of
 
baseball
 
fields
 
being
 
done
 
in
 
the
 
last
 
couple
 
of
 
years.
 
This
 
is
 
due
 
to
 
the
 
short
 
spring
 
season
 
for
 
spring
 
sports
 
and
 
the
 
negative
 
impact
 
of
 
New
 
England
 
weather.
 
The
 
turf
 
field
 
would
 
allow
 
year-long
 
use
 
with
 
no
 
rest.
 
 
We
 
are
 
currently
 
gathering
 
data
 
from
 
athletic
 
directors
 
across
 
the
 
state
 
for
 
accurate
 
information
 
on
 
the
 
number
 
of
 
turf
 
fields.
 
Glastonbury
 
public
 
schools
 
just
 
compiled
 
a
 
list
 
for
 
their
 
project
 
proposal
 
and
 
reported
 
to
 
the
 
Glastonbury
 
Board
 
of
 
Education
 
that
 
28
 
out
 
of
 
31
 
of
 
the
 
districts
 
in
 
their
 
conference
 
have
 
at
 
least
 
one
 
turf
 
playing
 
field.
 
Environmental
 
Impact:
 
Are
 
there
 
any
 
known
 
environmental
 
impacts
 
of
 
installing
 
a
 
new
 
turf
 
field?
 
There
 
is
 
no
 
impact.
 
CTDEEP
 
has
 
various
 
findings
 
right
 
on
 
their
 
website
.
 
Water
 
coming
 
from
 
the
 
field
 
is
 
filtered
 
through
 
the
 
stone
 
base
 
and
 
typically
 
comes
 
out
 
cleaner
 
from
 
the
 
site
 
than
 
what
 
is
 
found
 
prior
 
to
 
installing
 
turf.
 
All
 
FieldTurf
 
materials
 
will
 
be
 
PFAS-free
 
starting
 
in
 
'26.
 
We
 
are
 
preparing
 
a
 
more
 
comprehensive
 
package
 
on
 
turf
 
fields
 
for
 
public
 
consumption
 
in
 
the
 
near
 
future.
 
Add-Ons
 
&
 
Maintenance:
 
Are
 
there
 
"extras"
 
(scoreboards,
 
lights,
 
fencing)
 
required
 
that
 
aren't
 
in
 
the
 
base
 
quote?
 
Additionally,
 
what
 
are,
 
if
 
any,
 
the
 
recurring
 
maintenance
 
costs
 
for
 
these
 
fields?
 
Turf
 
Field
 
Co.
 
provides
 
the
 
equipment
 
and
 
training
 
for
 
Granby
 
Public
 
Schools
 
staff
 
to
 
complete
 
maintenance
 
independently.
 
There
 
are
 
also
 
options
 
to
 
have
 
a
 
service
 
plan
 
where
 
Field
 
Turf
 
would
 
provide
 

Page 187

professional
 
services,
 
which
 
is
 
approximately$3,500
 
per
 
year
 
per
 
field.
 
For
 
multiple
 
fields,
 
we
 
would
 
receive
 
a
 
discount,
 
so
 
the
 
overall
 
cost
 
would
 
be
 
approximately
 
$8,500
 
per
 
year.
 
 
Existing
 
Equipment:
 
Does
 
the
 
quote
 
include
 
the
 
grandstand
 
seating
 
shown
 
in
 
the
 
overview?
 
Regarding
 
the
 
scoreboard,
 
was
 
a
 
new
 
one
 
considered,
 
or
 
is
 
the
 
current
 
one
 
reusable?
 
Nothing
 
new
 
is
 
included;
 
these
 
are
 
all
 
optional
 
add-ons.
 
The
 
base
 
price
 
is
 
generally
 
rebuilding
 
the
 
field...
 
fence
 
line
 
and
 
inside.
 
Everything
 
outside
 
of
 
that
 
would
 
be
 
an
 
add-on.
 
We
 
try
 
to
 
structure
 
the
 
pricing
 
as
 
"need
 
to
 
have"
 
versus
 
"nice
 
to
 
have".
 
Timeline
 
&
 
Exclusions:
 
 
Exclusions
 
are
 
answered
 
above.
 
The
 
full
 
report
 
can
 
be
 
viewed
 
here
.
 
 
What
 
is
 
the
 
estimated
 
completion
 
timeline?
 
 
From
 
Field
 
Turf
 
professionals:
 
“Generally,
 
each
 
field
 
would
 
be
 
3-4
 
months.
 
However,
 
with
 
various
 
fields
 
on
 
one
 
side,
 
we
 
can
 
move
 
crews
 
from
 
one
 
field
 
to
 
the
 
next
 
in
 
a
 
staggered
 
manner
 
to
 
get
 
that
 
timeframe
 
down.
 
We
 
would
 
suggest
 
starting
 
the
 
Stadium
 
Field
 
in
 
May,
 
so
 
it
 
is
 
complete
 
for
 
mid-August.
 
The
 
second
 
field
 
would
 
be
 
replaced
 
after
 
school
 
is
 
over,
 
so
 
you
 
have
 
facilities
 
available
 
during
 
the
 
full
 
year.
 
And
 
then
 
baseball
 
would
 
be
 
done
 
in
 
the
 
late
 
summer
 
/fall.
 
The
 
full
 
project
 
would
 
be
 
May
 
-
 
Early
 
December.
 
GMMS
 
Architectural
 
Fees:
 
Can
 
you
 
walk
 
the
 
committee
 
through
 
the
 
methodology
 
used
 
to
 
arrive
 
at
 
the
 
$1.75M
 
quote
 
for
 
architectural
 
design
?
 
If
 
this
 
includes
 
repairs,
 
please
 
outline.
 
 
In
 
our
 
previous
 
CPPAC
 
Discussion
 
Memo
 
(linked
 
here)
 
We
 
state:
 
“Specific
 
HVAC
 
assessment
 
will
 
be
 
complete
 
in
 
April
 
of
 
2026.
 
In
 
addition,
 
the
 
Board
 
of
 
Education
 
will
 
contract
 
for
 
a
 
comprehensive
 
Facilities
 
Conditions
 
Assessment
 
to
 
determine
 
priorities
 
and
 
engage
 
in
 
architectural
 
plans
 
for
 
future
 
consideration.”
 
This
 
is
 
now
 
scheduled
 
for
 
February
 
17th
 
and
 
18th.
 
“In
 
reliance
 
upon
 
previously
 
done
 
repairs
 
and
 
the
 
visual
 
assessment,
 
the
 
estimate
 
at
 
this
 
time
 
to
 
conduct
 
necessary
 
repairs
 
and
 
engage
 
with
 
an
 
architectural
 
design
 
firm
 
is
 
$1.75
 
Million.”
 
Terracon
 
Estimate:
 
The
 
report
 
identifies
 
$3.1M
 
in
 
total
 
replacement
 
costs
 
over
 
10
 
years,
 
with
 
$1.69M
 
labeled
 
as
 
"immediate."
 
Is
 
the
 
current
 
recommendation
 
to
 
defer
 
all
 
of
 
these
 
items?
 
If
 
so,
 
please
 
be
 
prepared
 
to
 
discuss
 
the
 
rationale.
 
As
 
we
 
have
 
shared
 
previously,
 
a
 
visual
 
inspection
 
of
 
GMMS
 
was
 
done
 
as
 
an
 
initial
 
look
 
at
 
the
 
building.
 
We
 
have
 
now
 
completed
 
the
 
necessary
 
ed
 
specifications
 
meetings,
 
and
 
that
 
report
 
is
 
being
 
compiled
 
now.
 
We
 
have
 
an
 
HVAC
 
inspection
 
being
 
conducted
 
over
 
the
 
April
 
school
 
break,
 
and
 
we
 
have
 
a
 
Full
 
Facilities
 
Conditions
  
Assessment
 
being
 
conducted
 
over
 
the
 
long
 
Presidents'
 
weekend
 
in
 
February.
 
There
 
is
 
a
 
comprehensive
 
enrollment
 
study
 
being
 
presented
 
at
 
the
 
February
 
18th
 
BOE
 
meeting.
 
These
 
final
 
reports
 
are
 
essential
 
to
 
provide
 
the
 
necessary
 
information
 
to
 
inform
 
any
 
projects-
 
repairs
 
or
 
renovations
 
to
 
GMMS.
 
 

Page 188

G R A N B Y
G R A N B Y
3
1
2
5
4 c
50 SEATS
c
3
1
2
5 4
c
50 SEATS
c 3
12
5
4
c
50 SEATS
c
0'40'160'
SCALE: 1"=80'
80'
GRANBY MEMORIAL HIGH SCHOOL
ATHLETIC FACILITIES
39 SCHOOL STREET
GRANBY, CONNECTICUTACHUSETTSAPRIL 15, 2025
FULL SITE
Drawing: P:\ESTIMATING\2024 BID ACTIVITY\CONNECTICUT\GRANBY\GRANBY HS CONCEPTS FINAL.DWG Layout Tab:FULL SITEPlotted by: T017224    On this date: Fri, 2025 April 18 - 10:40am
NOTES:
1)ALL DESIGN AND EXISTING CONDITIONS MAPPING BASED
ON AVAILABLE MAPPING AND SHOULD BE CONSIDERED
APPROXIMATE.
2)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA
AND REQUIRES A CERTIFIED FIELDTURF INSTALLER AND
BUILDER TO IMPLEMENT THE PROPOSED CONDITIONS.
3)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA
AND NO ATTEMPTS SHALL BE MADE TO DUPLICATE OR
REPLICATE WITHOUT THE PREMISSION OF FIELDTURF.
TRACK AND
FIELD
BASEBALL AND
SOFTBALL
FIELD 2
TENNIS

Page 189

  
 
DESIGN PROPOSAL 
 
GRANBY MEMORIAL HIGH SCHOOL                
ATHLETIC FACILITIES IMPROVEMENTS 
 
  
 
Date:    January 16, 2026 
Prepared For:   Christopher DeGray – Director of Facilities, Granby Public Schools            
Prepared By:  Andrew Dyjak – Regional Vice President, New England 
  Chris Hulk, PE – Director of Design and Construction, New England 
  Jonathan Luster, PE – Regional Construction Manager, New England 
Address: Granby Memorial High School, 39 School Street, Granby, CT 
Dear Mr. DeGray, 
FieldTurf is pleased to present a comprehensive proposal for the enhancement of athletic facilities at the Granby 
Memorial High School campus. This project aims to make significant improvements to various areas, including the 
stadium field, baseball field, secondary rectangular field, and tennis courts. The overarching goal is to create state-of-
the-art facilities that maximize playability while minimizing impact on the surrounding areas. 
FieldTurf pricing is based on the Capital Region Education Council (CREC) program. CREC is a member of The Association 
of Educational Purchasing Agencies (AEPA) program. The AEPA is a purchasing co-op that provides member schools with 
pre-determined preferential pricing by approved vendors. Since the product has already been bid at the national level, 
individual schools do not have to duplicate the formal bid process. AEPA IFB #024-A.  
 
 
      Click on the following AEPA hyperlink for more information:  AEPA IFB #24-A. 
 
Scope of the Project: 
The design proposal encompasses a comprehensive approach, delivering site plans tailored for each project. These 
include a range of key sheets such as existing conditions and removals plans, layout and materials plans, grading and 
utility plans, sediment and erosion control plans, and details and cross-sections as needed. Additionally, the proposal 
involves assisting the school in the submission process to local regulatory agencies, with electronic copies of plans 
provided by FieldTurf for regulatory applications. 
Timeline and Deliverables: 
FieldTurf commits to delivering site development plans for review with the school within 4 weeks of a signed contract. 
Additionally, FieldTurf will work with the school to develop a timeline for submission to local regulatory agencies as 
required.  
 

Page 190

  
 
DESIGN PROPOSAL 
 
Commitment to Excellence: 
FieldTurf is dedicated to providing the highest level of service throughout the project, ensuring the creation of a new, 
state-of-the-art athletic facility for Granby. 
We look forward to the opportunity to collaborate on this exciting project. Should you have any questions or require 
further information, please do not hesitate to contact us. 
DESIGN PROPOSAL PRICING 
FieldTurf is committed to delivering a comprehensive design proposal that not only meets regulatory requirements but 
also aligns with the vision and needs of the school. Our goal is to ensure a smooth and efficient process, from design 
development to permit acquisition, ultimately providing the school with a detailed pricing proposal for their 
consideration. 
A) Athletic Fields Design, Permit Assistance, and Pricing 
a. Review of Existing Mapping 
i. Contact local regulatory agencies and utility providers to obtain available mapping. 
ii. Evaluation of existing mapping related to site development, utilities, and wetlands. 
 
b.  Topographic and Planimetric Site Features Survey and Wetland Delineation 
i. Acquisition of partial site survey for key topographic and planimetric site features that are essential 
for the design-build and permit process.  
ii. Identification and mapping of the boundaries of wetland areas within the vicinity of the project sites 
and provide written report.  
 
c. Site Investigation 
i. Conduct a test pit program consisting of 4-5 test pits, per field, to determine existing soil 
characteristics as they pertain to the renovations to the facility. 
ii. Arrange for and procure a third-party TV inspection of key storm drainage lines. Assumed one-day 
evaluation of the existing system. 
iii. Evaluate the electrical capacity of the different fields to accommodate supplementary athletic field 
lighting. 
 
d. Site Evaluation and Budgeting 
i. Review findings of each site with the Board of Education, Field Committee, and key stake holders 
ii. Develop a priority list of site development improvements and determine which sites will be 
prioritized to require in depth site development plans and which site are suitable development 
descriptions. For example, a grass field may only require description of soil amendment rather than 
a set of site plans.  
 
e. Provide Permitting Plan Set 
i. Preparation of site development plans suitable for use in local regulatory approvals and CREC Co-Op 
pricing, including: 
1. Title Sheet 
2. Existing Conditions and Removals Plan 

Page 191

  
 
DESIGN PROPOSAL 
 
a. Depicting limits of clearing, materials to be moved or removed, and locations of 
existing onsite fencing, utilities, etc. 
3. Site Development Plan 
a. Depicting athletic field limits, field access, schematic bleacher sizing, and walkways 
as applicable. 
b. Depicting stormwater requirements, field grades, site lighting, typical site cross 
sections, underground field drainage system, and schematic electrical locations. 
4. Sediment and Erosion Control Plan 
 
5. Site Details 
a. Depicting typical sections and details for curbs, piping systems, base sections, and 
additional details as required for field installation. 
 
f. Assist School in Acquiring Regulatory Permits 
i. Provide electronic plans to the school for permit submissions. 
ii. Attend up to (3) regulatory meetings with local authorities. 
 
Total:             $29,500.00  
 
Please feel free to reach out to any member of our project team with questions about our offer: 
Andrew Dyjak 
Regional Vice President 
(860) 333-7839 
Andrew.Dyjak@Fieldturf.com 
Christopher Hulk, PE 
Director of Design and Construction  
(203) 676-4445 
Christopher.Hulk@Fieldturf.com 
 
Jonathan Luster, PE 
Regional Construction Manager 
(860)227-4915 
Jonathan.Luster@Fieldturf.com 
 
 
Thank you again for your interest in FieldTurf, we look forward to working with you. 
                         
Per:     
Marie-Christine Raymond, Director of Operations 
FieldTurf USA, Inc. / Tarkett Sports Canada, Inc. 
 
FieldTurf USA, Inc. holds the Cooperative Purchase contract, any PO for Contract must be made out to 
FieldTurf USA, Inc. 175 N Industrial Blvd NE. Calhoun, GA 30701 
If you have questions regarding the FieldTurf and Beynon SmartBuy Cooperative Purchasing Program, please contact Eric 
Fisher at:  Eric.Fisher@smartbuycooperative.com. 
 
 
 

Page 192

  
 
DESIGN PROPOSAL 
 
Conditions            
Notwithstanding any other document or agreement entered into by FieldTurf in connection with the supply and 
installation only of its product pursuant to the present bid proposal, the following shall apply: 
a) The limits of the design provided by FieldTurf shall be for schematic design defined by the limits of turf installed, 
and areas immediately adjacent to the limits of turf in order to provide smooth transitions.   
 
b) This Design Services proposal and its acceptance is subject to strikes, accidents, delays beyond our control and 
force majeure; 
 
c) Final payment shall be upon the substantial completion of FieldTurf’s obligations; 
 
d) Accounts overdue beyond 30 days of invoice date will be charged at an interest rate of 1.5% per month (19.56% 
per annum); 
 
e) This proposal is based on a single mobilization.  If the site is not ready and additional mobilizations are 
necessary, additional charges will apply. 
 
f) FieldTurf shall be entitled to recover all costs and expenses, including attorney fees, associated with collection 
procedures in the event that FieldTurf pursues collection of payment of any past due invoice. 
 
g) Survey, stormwater reports, geotechnical services, design of special structures and Special studies such as 
Environmental Assessments, tree surveys, etc. (if required) shall be provided by others.  
 
h) Important Note Regarding Lump Sum Agreements:  This paragraph is only applicable to the portion of this 
agreement captioned as a “Lump Sum.”  Fees indicated in any lump sum/fixed-fee agreement reflect one (1) 
initial meeting with the client prior to submittal, one (1) drawing revision based on comments generated before 
or during that initial meeting, and one (1) informal meeting with the Local Permitting Authority.  Additional 
meetings and revisions beyond those indicated above (including client meetings, consultant meetings and site 
visits) are considered additional services that will be billed in accordance with the hourly rate provisions set 
forth above.  These services and fees shall be considered above and beyond the stated lump sum amount 
indicated in the contract. 
 
i) Important Note Regarding Construction Administration: Once permits and approvals (i.e. clearing, grading, 
surveying, staking, demolition, or construction) are granted for development related activity, FieldTurf reserves 
the right to conduct the necessary construction administration for the site. Plans, reviews, site visits, testing, as-
built coordination, details, and plan revisions associated with this work will be conducted without need for 
authorization.   
 
In the event that the Client elects to contract with a Builder/Installer who is not either a) FieldTurf, or b) a 
FieldTurf certified builder, prior to permits being applied for, the following actions will be taken: 
1) FieldTurf will deliver all final design document to the Client for their use; 
2) The Engineer of Record will remove their stamp and be fully relieved of any liability with regard to the 
design; 
3) The Client will fully relieve FieldTurf of any liability with regard to the design. 
 
 

Page 193

  
 
DESIGN PROPOSAL 
 
 
 
 
4) If permits have been applied for:  FieldTurf and its sub-consultants will remove FieldTurf name and notify  
the Local Permitting Jurisdictions that it (they) will no longer be a party to the permit application, and it will  
be the responsibility of the Client to file the necessary change of status paperwork along with their selected 
Engineer of Record. 
 
j) Important Note Regarding Extra Work:  During the course of the construction phase of the project, should work 
additional to that defined above be required, the client will be provided a written scope of work addressing the 
anticipated services required.  Written approval of that work will be required prior to commencement of the 
work.  That work will then proceed on an hourly basis in accordance with the attached rate sheet or on a 
negotiated, lump sum fee basis. 
 
k) Reimbursable Expenses:   In addition to the above fees for engineering services, FieldTurf will invoice for 
reimbursable services, such as plotting, postage, survey, express delivery charges, travel related expense over 
and above that specifically stated above, etc.  Reimbursable will appear as Additional Services on the monthly 
invoices and shall be in accordance with the attached fee schedule and based on actual usage.  We suggest 
budgeting $1,500 for this item.  
 
EXCLUSIONS: 
 
 
 
 
 
➢ Full electrical design and plans 
➢ Design of renovations to existing septic or sanitary systems 
➢ Traffic study or evaluations of traffic controls 
➢ Design of special features, such as but not limited to, press box, buildings, bridges, culverts, etc… 
➢ Non-local regulatory permits 
➢ Geotechnical investigation and design 
➢ A-2 and/or full T-2 Surveys for full site. Partial T-2 survey included for key areas.  
➢ Design of features outside items shown or listed on concept plan 

Page 194

  
 
DESIGN PROPOSAL 
 
PROPOSAL ACCEPTANCE SHEET 
The outlined Proposal has been reviewed and accepted to all portions hereinbefore listed, and is authorized to form as a 
binding Contractual Agreement between FieldTurf USA, Inc. (“FieldTurf”) and the client identified below (“Client”).  
Identifying information for the parties is as follows: 
 
Client:   Granby Public Schools  
Project Name:   Athletic Facilities Improvements – Granby Memorial High School 
Project Location: Granby Memorial High School, Granby, CT 
 
FIELDTURF USA, INC. 
 
By:  _____________________________                   ________________________________ 
       Name            Title 
 
Date:  ___________________________    
 
Granby Public Schools 
 
By:  _____________________________                   ________________________________ 
         Name             Title 
 
Date:  ___________________________    
 
Please sign and return this executed original letter to our office.  This proposal is valid for a period of 30 days from the 
date of issue.   
  

Page 195

  
 
DESIGN PROPOSAL 
 
 
RATE SCHEDULE 
 
Design Consultant, Principal Design Consultant ......................................................... $ 185.00/Hr.   
Principal Engineer .......................................................................................................... 185.00/Hr.  
Project Engineer ...........................................................................................................   145.00/Hr.   
Designer (E.I.T.) ...............................................................................................................  90.00/Hr.  
Draftsman/Designer (AutoCAD)……. ................................................................................ 80.00/Hr.   
Clerical  ............................................................................................................................  35.00/Hr.  
Landscape Architecture Principal .................................................................................. 150.00/Hr.  
Landscape Architecture Senior ...................................................................................... 135.00/Hr.  
Landscape Architecture Project ..................................................................................... 110.00/Hr.  
Landscape Architecture Apprentice ................................................................................ 75.00/Hr.   
Travel ........................................................................................................................ 65 cents/mile   
Office Staff ....................................................................................................................... 50.00/Hr.   
Postage, Shipping, Telephone, Fax, etc. .................................................................... cost plus 15%   
Printing/Plotting .......................................................................................................... 50 cents/SF   
Reproductions and Reprographics .............................................................................cost plus 15%   
Subconsultants ...........................................................................................................cost plus 15%   
Rates shown are effective as of January 1, 2023 and through the remainder of the calendar  
year. They also apply for the full term of all contracts signed during 2023, unless stated  
otherwise in specific contract documents.   
  
  
 
 
 

Minutes: archived copy, SHA-256 36b936f6b174…. Agenda: archived copy, SHA-256 be070cfcde37…. Packet: kept offline, SHA-256 7364b7902ae1….