Towns / Granby / Public Building and Capital Project Committee / Jul 8, 2026
Public Building and Capital Project Committee, Jul 8, 2026
Granby Public Building and Capital Project Committee Hide agendas that already have minutesDocuments
| Type | Document | Pages | Open |
|---|---|---|---|
| minutesminutes | Public Building & Capital Project Committee Regular Meeting Minutes | 2 | PDF download · town site |
| agenda | Public Building & Capital Project Committee Regular Meeting | 2 | PDF download · town site |
| packetpacket | Public Building & Capital Project Committee Regular Meeting (packet) Not attached: this packet is 38 MB, too large to host here. Use the town site link. |
195 | town site |
Summary of the minutes
AI-generated summary. Each line links to the PDF page it came from; check it before relying on it.
Read the official minutes (PDF, 2 pages) The PDF is the record; this summary is a guide to it.
At its first regular meeting, the committee elected Mark Neumann as chairman and Anne Adamson as vice-chairman, and voted to follow Robert's Rules of Order and adopt a meeting schedule. The committee deferred discussion of the library, Salmon Brook Park and sewer pump projects, and it will review engineering firm RFP responses at its next meeting.
Decisions (5) · all reported votes
- Election of Chair
Mark Neumann elected chairman by unanimous vote after nomination
p. 1 - Election of Vice Chair
Anne Adamson elected vice-chairman by unanimous vote after nomination
p. 1 - Adopt Robert's Rules of Order
Committee voted to conduct its meetings in accordance with Robert's Rules of Order
Vote: Motion by M. Gottlieb, seconded by M. Lengvarsky, carried 8-0-0 · p. 1 - Adopt meeting schedule
Committee adopted the meeting schedule submitted to the Town clerk and will meet regularly on the second Wednesday of each month
Vote: Motion by A. Adamson, seconded by W. Pascucci, carried 8-0-0 · p. 1 - Adjournment
Committee voted to adjourn the meeting at 7:56 p.m.
Vote: Motion by K. McCord, seconded by A. Adamson, carried 8-0-0 · p. 2
Also discussed (5)
- Secretary position: No nominations were made for secretary; no action recorded · p. 1
- Granby Public Library Renovation and Expansion Project: Discussion deferred to a future meeting · p. 1
- Salmon Brook Park Pickleball Courts and Year-Round Bathroom Project: Discussion deferred to a future meeting · p. 2
- Sewer Pump Maintenance Project: Discussion deferred to a future meeting · p. 2
- Engineering RFP responses: Responses to the Request for Proposal for an engineering firm will be shared and discussed at the next meeting · p. 2
Summary of the agenda: Public Building & Capital Project Committee Regular Meeting
AI-generated summary.
This is the agenda for the Granby Public Building & Capital Project Committee's July 8, 2026 regular meeting at the Senior Center. It lists organizational items, a discussion of bond referendum questions, and overviews of several capital projects.
On the agenda (11)
- Elect Chair, Vice Chair And Secretary · p. 1
- Adopt Roberts Rules · p. 1
- Adopt Meeting Schedule · p. 1
- Discussion On Bond Referendum Questions, Proceedings & Process · p. 1
- Overview of Granby Public Library Renovation And Expansion Project · p. 1
- Overview of Granby Memorial Middle School Repairs And Design/Scoping Work Project · p. 1
- Overview of High School Baseball/Softball Fields · p. 1
- Overview of High School Stadium Field, Track And Field Two · p. 2
- Overview of Salmon Brook Park Pickleball Courts And Year-Round Bathroom Project · p. 2
- Overview of Sewer Pump Maintenance Project · p. 2
- Discussion Of Action Items For The Next Meeting, including Engineering RFP Issued And Responses Will Be Shared · p. 2
This PDF is a scan; its text was read by OCR and may contain errors.
Full text of the documents
View the minutes PDF on this page (Public Building & Capital Project Committee Regular Meeting Minutes)
Text of the minutes (Public Building & Capital Project Committee Regular Meeting Minutes, 2 pages)
Page 1 · open in PDF
TOWN OF GRANBY PUBLIC BUILDING & CAPITAL PROJECT COMMITTEE REGULAR MEETING MINUTES JULY 8, 2026 PRESENT: Anne Adamson, Peter Anderson, Mark Gottlieb, Christopher Lavigne, Michael Lengvarsky, Kent McCord, Mark Neumann, and William Pascucci ALSO PRESENT: Cheri Burke, Superintendent of Schools and Mike Walsh, Town Manager ABSENT: David Peling 1. PLEDGE OF ALLEGIANCE 2. INTRODUCTION OF MEMBERS AND OPENING REMARKS The members of the committee were introduced, and First Selectman Mark Fiorentino welcomed the group and thanked them for their willingness to serve on the committee. 3. ELECT CHAIR, VICE CHAIR AND SECRETARY Mark Neumann was nominated to serve as chairman. There being no further nominations, nominations were closed. By unanimous vote, Mark Neumann was elected chairman. Anne Adamson was nominated to serve as vice- chairman. There being no further nominations, nominations were closed. By unanimous vote, Anne Adamson was elected vice- chairman. There were no nominations for the position of secretary. 4. ADOPT ROBERTS RULES ON A MOTION by M. Gottlieb, seconded by M. Lengvarsky, the committee voted (8-0-0) to conduct its meetings in accordance with Robert’s Rules of Order. 5. ADOPT MEETING SCHEDULE ON A MOTION by A. Adamson, seconded by W. Pascucci, the committee voted (8-0-0) to adopt the meeting schedule submitted to the Town clerk and meet regularly on the second Wednesday of each month. 6. DISCUSSION ON BOND REFERENDUM QUESTIONS, PROCEEDINGS & PROCESS Town Manager Walsh provided an overview of the charge of the committee and the bonding process. 7. OVERVIEW OF INDVIDUAL PROJECTS 7.I. Granby Public Library Renovation and Expansion Project Discussion of the library project was deferred to a future meeting. 7.II. Granby Memorial Middle School Repairs and Design/Scoping Work Project Superintendent Burke and Christopher Degray, BOE Director of Facilities presented an overview of the middle school project and the high school athletic fields project.
Page 2 · open in PDF
PBCPC Minutes 7/8/26 Page 2 7.III. High School Baseball/Softball Fields This agenda item was incorporated into the discussion of agenda item 7.II. 7.IV. High School Stadium Field, Track, and Field Two This agenda item was incorporated into the discussion of agenda item 7.II. 7.V. Salmon Brook Park Pickleball Courts and Year-Round Bathroom Project Discussion of the Salmon Brook Park projects was deferred to a future meeting. 7.VI. Sewer Pump Maintenance Project Discussion of the sewer pump project was deferred to a future meeting. 8. DISCUSSION OF ACTION ITEMS FOR NEXT MEETING 8.I. Engineering RFP Issued and Responses Shared Responses to the Request for Proposal for an engineering firm will be shared and discussed at the next meeting. 9. ADJOURNMENT: ON A MOTION by K. McCord, seconded by A. Adamson, the committee voted (8-0-0) to adjourn the meeting at 7:56 p.m. Respectfully submitted, Betsy Mazzotta Recording Secretary
View the agenda PDF on this page (Public Building & Capital Project Committee Regular Meeting)
Text read from the scanned agenda (OCR) (Public Building & Capital Project Committee Regular Meeting, 2 pages)
Page 1 · open in PDF
Join Zoom Meeting https://us06web.zoom.us/j/89187529615?pwd=Q6phqjlQtm8glsbn9asLmaavcSMqjP.1 Meeting ID: 891 8752 9615 Passcode: 244287 TOWN OF GRANBY Public Building & Capital Project Committee Regular Meeting Agenda Wednesday, July 8, 2026 – 6 p.m. Senior Center 1. Pledge Of Allegiance 2. Introduction Of Members And Opening Remarks - First Selectman Mark Fiorentino Documents: 2 PUBLIC BUILDING AND CAPITAL PROJECT COMMITTEE.PDF 3. Elect Chair, Vice Chair And Secretary 4. Adopt Roberts Rules 5. Adopt Meeting Schedule 6. Discussion On Bond Referendum Questions, Proceedings & Process Documents: 6 DRUMMER MAY 2026.PDF 7. Overview Of Individual Projects 7.I. Granby Public Library Renovation And Expansion Project 7.II. Granby Memorial Middle School Repairs And Design/Scoping Work Project Documents: 7.2 GRANBY MEMORIAL MIDDLE SCHOOL REPAIRS AND DESIGN SCOPING WORK PROJECT.PDF 7.III. High School Baseball/Softball Fields Documents: 7.3 GRANBY-PROPOSAL---BASEBALL-MULTIPURPOSE-FIELD.PDF 7.IV. High School Stadium Field, Track And Field Two Documents:
Page 2 · open in PDF
7.4 HIGH SCHOOL STADIUM FIELD, TRACK, AND FIELD TWO.PDF 7.V. Salmon Brook Park Pickleball Courts And Year-Round Bathroom Project 7.VI. Sewer Pump Maintenance Project 8. Discussion Of Action Items For The Next Meeting 8.I. Engineering RFP Issued And Responses Will Be Shared 9. Adjournment The next regular meeting of the Public Building & Capital Project Committee is scheduled for Wednesday, August 12, 2026, at 6 p.m. at the Senior Center.
Text of the packet (Public Building & Capital Project Committee Regular Meeting (packet), 195 pages)
Page 1
Join Zoom Meeting https://us06web.zoom.us/j/89187529615?pwd=Q6phqjIQtm8glsbn9asLmaavcSMqjP.1 Meeting ID: 891 8752 9615 Passcode: 244287 TOWN OF GRANBY Public Building & Capital Project Committee Regular Meeting Agenda Wednesday, July 8, 2026 – 6 p.m. Senior Center Pledge Of Allegiance Introduction Of Members And Opening Remarks - First Selectman Mark Fiorentino 2 PUBLIC BUILDING AND CAPITAL PROJECT COMMITTEE.PDF Elect Chair, Vice Chair And Secretary Adopt Roberts Rules Adopt Meeting Schedule Discussion On Bond Referendum Questions, Proceedings & Process 6 DRUMMER MAY 2026.PDF Overview Of Individual Projects Granby Public Library Renovation And Expansion Project Granby Memorial Middle School Repairs And Design/Scoping Work Project 7.2 GRANBY MEMORIAL MIDDLE SCHOOL REPAIRS AND DESIGN SCOPING WORK PROJECT.PDF High School Baseball/Softball Fields 7.3 GRANBY-PROPOSAL---BASEBALL-MULTIPURPOSE-FIELD.PDF High School Stadium Field, Track And Field Two 7.4 HIGH SCHOOL STADIUM FIELD, TRACK, AND FIELD TWO.PDF Salmon Brook Park Pickleball Courts And Year-Round Bathroom Project Sewer Pump Maintenance Project Discussion Of Action Items For The Next Meeting Engineering RFP Issued And Responses Will Be Shared Adjournment The next regular meeting of the Public Building & Capital Project Committee is scheduled for Wednesday, August 12, 2026, at 6 p.m. at the Senior Center. 1. 2. Documents: 3. 4. 5. 6. Documents: 7. 7.I. 7.II. Documents: 7.III. Documents: 7.IV. Documents: 7.V. 7.VI. 8. 8.I. 9.
Page 2
Join Zoom Meeting https://us06web.zoom.us/j/89187529615?pwd=Q6phqjIQtm8glsbn9asLmaavcSMqjP.1 Meeting ID: 891 8752 9615 Passcode: 244287 TOWN OF GRANBY Public Building & Capital Project Committee Regular Meeting Agenda Wednesday, July 8, 2026 – 6 p.m. Senior Center Pledge Of Allegiance Introduction Of Members And Opening Remarks - First Selectman Mark Fiorentino 2 PUBLIC BUILDING AND CAPITAL PROJECT COMMITTEE.PDF Elect Chair, Vice Chair And Secretary Adopt Roberts Rules Adopt Meeting Schedule Discussion On Bond Referendum Questions, Proceedings & Process 6 DRUMMER MAY 2026.PDF Overview Of Individual Projects Granby Public Library Renovation And Expansion Project Granby Memorial Middle School Repairs And Design/Scoping Work Project 7.2 GRANBY MEMORIAL MIDDLE SCHOOL REPAIRS AND DESIGN SCOPING WORK PROJECT.PDF High School Baseball/Softball Fields 7.3 GRANBY-PROPOSAL---BASEBALL-MULTIPURPOSE-FIELD.PDF High School Stadium Field, Track And Field Two 7.4 HIGH SCHOOL STADIUM FIELD, TRACK, AND FIELD TWO.PDF Salmon Brook Park Pickleball Courts And Year-Round Bathroom Project Sewer Pump Maintenance Project Discussion Of Action Items For The Next Meeting Engineering RFP Issued And Responses Will Be Shared Adjournment The next regular meeting of the Public Building & Capital Project Committee is scheduled for Wednesday, August 12, 2026, at 6 p.m. at the Senior Center. 1. 2. Documents: 3. 4. 5. 6. Documents: 7. 7.I. 7.II. Documents: 7.III. Documents: 7.IV. Documents: 7.V. 7.VI. 8. 8.I. 9.
Page 3
PUBLIC BUILDING AND CAPITAL PROJECT COMMITTEE The PBCPC shall: 1. Review architectural drawings, contracts, bids, specifications, and other related documents of any construction or renovation of any town-owned building or reconstruction project (excluding the annual Road Improvement Project) exceeding $250,000. 2. Monitor the progress of any such construction or renovation and make recommendations to the Board of Selectmen as appropriate; and 3. Determine when such construction or renovation is complete. The PBCPC shall consist of seven members as follows: • Six members of the public with at least one member with construction industry experience and at least one member having financial experience • One member from the Board of Selectmen (BOS) • One member from the Board of Education (BOE) • One member from the Board of Finance (BOF) • Superintendent of Schools (ex-officio) • Town Manager (ex-officio) Members (all terms expire 1/13/32) Anne Adamson Peter Anderson Mark Gottlieb Christopher Lavigne Michael Lengvarsky Kent McCord (Board of Finance) Mark Newman (Board of Selectmen) William Pascucci David Peling (Board of Education) Ex-officio Members Cheri Burke (Superintendent of Schools) Mike Walsh (Town Manager)
Page 4
How Granby Bonds Capital Projects Back in October of 2025, I wrote a story for the Drummer explaining how Granby is a town that practices “direct democracy”. Direct democracy means you, the voters, through the ballot box, choose your elected officials , approve the Town’s annual budget, and periodically, are asked to go to the polls to approve spending and funding for large capital projects. The process where voters approve spending and funding for large capital projects is called “bonding”. Simply put, bonding is borrowing for a municipal capital project costing over $250,000, similar to what a resident would do when buying a home, they would take out a mortgage. Granby bonds (issues debt) for 20 years on a tax -exempt basis and in such a way as any new debt replaces older, paid off/retired debt. To say it another way , taxes that property owners pay annually to the town pay for debt service on the bonds and that borrowing is done in such a way so that taxes are not increased by the new debt, through at least 2032. This financial technique is called “debt replacement stabilization” and is practiced by the Town of Granby and is an example of just one of the many fiscally prudent fiscal practices that other towns would do well to emulate. The Granby Charter prescribed bonding p rocess that will unfold in the coming months starts with Board of Selectmen approval, then Board of Finance approval, then an Open House for Q and A, then a Town Meeting, and then the voters will make the final decision on each question at a bonding referendum vote on September 22, 2026 at Town Hall from 8 a.m. to 8 p.m. The draft questions were presented to the Board of Selectmen on May 4 th. They will edit the questions in the coming weeks for eventually voter consideration. The questions are as follows: 1. Appropriation and Bond Authorization not to exceed $3,520,000 for the Baseball/Softball Fields at the High School Complex Project 2. Appropriation and Bond Authorization not to exceed $6,930,000 for Stadium Field, Track, and Field Two at the High School Complex Project 3. Appropriation and Bond Authorization not to exceed $3,000,000 for the Granby Memorial Middle School Repairs and Design/Scoping Work Project 4. Appropriation and Bond Authorization not to exceed $500,000 for Salmon Brook Park Pickleball Courts and Year-Round Bathroom Project 5. Appropriation in an Amount not to exceed $12,000,000 for the Granby Public Library Renovation and Expansion Project and Bond Authorization in an Amount Not to Exceed $6,000,000 to Fund a Portion of the Appropriation with the Balance of the Appropriation to be Funded by Private Contributions and Grants 6. Appropriation and Bond Authorization not to exceed $1,500,000 for Sewer Pumps Maintenance Project Hopefully, the narrative I’ve produced above gives you an understanding of the capital prioritization and funding process that is now underway for which you have direct input and approval over. If you have any questions on the information presented here, please reach out to me at 860- 844-5302 or Mwalsh@Granby-CT.Gov as I always welcome the opportunity to discuss Town issues.
Page 5
2026 Granby MS Facility Condition Assessment (FCA) SUMMARY OF FINDINGS Granby Memorial Middle School Abbrev Building Name: Est. Gross Area (SF): Year Constructed: Major Renovation: Date Assessed: Granby MS 73,406 1992 None Week of 02/16/2025 Report Date: 6/19/2026 REV Address 321 Salmon Brook Road Granby, CT 06035 83% Priority Estimated Assmt Cost % of Need Priority 1 - Within 1 Year 4,513,115$ 16.4% Priority 2 - Within 3 Years 12,622,784$ 46.0% Priority 3 - Within 5 Years 5,507,012$ 20.1% Priority 4 - Within 10 Years 4,805,201$ 17.5% 27,448,112$ 100% 10 YEAR FORECAST BY PRIORITY System Category Subtotal % of Need % of Need (Graphic) Bldg Envelope & Structure 1,318,992$ 4.8% Arch Interiors & Finishes 5,226,733$ 19.0% Elevators & Lifts 175,149$ 0.6% Mechanical & Plumbing 7,603,247$ 27.7% Fire Alarm & Protection 1,256,349$ 4.6% Electrical, Tech & Security 6,805,852$ 24.8% Site Improvements 5,061,790$ 18.4% 27,448,112$ 100% 10 YEAR FORECAST BY SYSTEM
Page 6
Architectural Systems Granby Middle School is a 1 and 2-story structure with no basement and no mechanical penthouse that is approximately 73,406 square feet. The building was constructed in 1992 with minor renovations to interior finishes and no additions. The building is constructed with steel framing and concrete floors. The roof assembly includes flat roof areas with a membrane on metal deck as well as pitched, standing seam metal roof areas. The exterior wall finish is brick veneer. There is no visible evidence of significant settlement or structural failure, however, snow concealed the visual inspection of the foundation in many areas. Interior floor finishes include resilient tile, ceramic tile, carpet, concrete, and painted concrete slab. Interior wall finishes include painted drywall and painted concrete masonry unit. Interior ceiling finishes include suspended acoustic tiles and painted drywall. The building is generally compliant in terms of the required provision of an ADA compliant common area restroom. Electrical Systems Granby Middle School is served by a utility owned outdoor pad mounted transformer located on the back side of the building. A service feeder from this transformer terminates in a 1600-amp switchgear with main fusible bolt lock switch and distribution sections containing fused disconnects for feeders to panels and equipment. Electric service is rated for 1600- amp, 480 y /277 v, 3ph 4 wire. Feeders to power panels in the building originate from this switchboard. Branch circuits from these panels provide power to lighting, outlets, HVAC equipment and kitchen appliances in the school. Lighting is a mix of fluorescent and recessed fixtures with LED lamps. Classroom lights are suspended with fluorescent lamps controlled by a motion sensor and wall switch. An outdoor diesel fired 500 kw generator set powers the entire school as it is an emergency shelter. Fire Alarm / Protection Systems The fire alarm system is comprised of a main control panel (MFG -FireLite MS-9600UDLS), power boosters, devices and wiring. An Ansul system provides fire protection for the kitchen hood. Mechanical / Plumbing Systems Granby Middle School is heated with three hot water (HW) boilers. HW is circulated to eight roof top units (RTUs) on the roof and five air handling units (AHUs) in the mechanical penthouse. HW is also circulated to cabinet unit heaters (CUHs), unit heaters (UHs), fin tube radiation (FTR) as well as HW reheat coils in variable air volume (VAV) terminal units throughout the building. Three of the above mentioned RTUs have direct expansion (DX) cooling coils with associated condensing units Report Date: 5/20/2026 2026 Granby MS Facility Condition Assessment (FCA) SUMMARY OF FINDINGS Granby Memorial Middle School
Page 7
to provide for cooling of the Choral, Instrument, and Cafeteria areas. The rest of the RTUs are heat only. Also, one of the above mentioned air handling units has DX cooling with an associated condensing unit as well to provide cooling of the administration area. The rest of the AHUs in the building are heat only. Additionally, there are two heat pump split systems that heat and cool the Audio Visual room and the Technology Lab spaces. All equipment appears to be operable. Roof mounted exhaust fans provide exhaust for bathrooms and other exhaust needs. The plumbing system provides domestic hot water to the building from three electric domestic hot water heaters (DHWHs) in the boiler room as well as two instantaneous gas-fired DHWHs in the rear domestic water service entrance room. The instantaneous DHWHs provide domestic hot water for the kitchen. Lavatories, water closets, urinals, and kitchen sink fixtures appear to be in good condition. Plumbing supply and sanitary piping were advised to be in a functional overall state. Report Date: 5/20/2026 2026 Granby MS Facility Condition Assessment (FCA) SUMMARY OF FINDINGS Granby Memorial Middle School
Page 8
2026 Granby MS Facility Condition Assessment ASSET TYPES PRESENT & CONDITION - GRANBY MIDDLE SCHOOL Subsystem Name Component Name EUL COND NOTES BUILDING ENVELOPE - ASSETS / COMPONENTS B20 Exterior Enclosure B2010 Exterior Wall SELECT TYPE(S) B2010-01 Cast in Place Concrete Wall 75 B2010-02 Precast Concrete Wall 45 B2010-03 Brick Masonry Wall 75 E All elevations. No evidence of failed grout or control joints B2010-03 Brick Masonry Wall 75 B2010-04 Concrete Block Wall (Common) 60 B2010-05 Concrete Block Wall (Decorative) 60 B2010-06 Cut Stone Wall 75 B2010-07 Cast Stone Wall 60 B2010-11 EIFS Wall 20 B2010-12 Stucco Wall 50 B2010-13 Translucent Panel Wall 15 B2010-14 Aggregate Faced Composite Panel Wall 45 B2010-15 Concrete Faced Insulated Panel Wall 45 B2010-16 Wood Shake Siding Wall 45 B2010-17 Wood Siding Wall 25 B2010-18 Fiber Cement Siding Exterior Wall 45 B2010-19 Preformed Metal Siding Wall 35 B2010-20 Vinyl Siding Wall 25 B2010-21 Clay Tile Shingle Wall 45 B2010-22 Slate Shingle Wall 75 B2010-23 High Pressure Laminate Panel 50 B2010-24 Pressure Treated Wood Panel 35 B2010-25 Decorative Wood Panel 20 B2010-26 Aluminum Siding Wall 35 B2010-27 Porcelain Tile Wall 60 B2010-28 Copper Panel Wall 50 B2010-29 Metal Panel Wall 15 B2010-30 Quarry Tile Wall 35 B2010-31 Composite Wall Panel 50 B2010-32 Plywood Sheathing 30 B2010-33 Plywood Sheathing Salt Structure 15 B2010-34 Fabric Cover & Metal Frame Wall/Roof Assm 20 B2010-35 Insulated Metal Panel Wall 15 B2010-37 Board & Batten Siding 20 B2010-38 Galvanized Steel Lattice Structure 60 3/31/2026 StudioJAED UNIFORMAT Master Asset List - Copyright 2026 Legend: E = Excellent, G = Good, F = Fair, P = Poor, FD = Failed / Failing, NA = No Access Page 1 of 5
Page 9
2026 Granby MS Facility Condition Assessment ASSET TYPES PRESENT & CONDITION - GRANBY MIDDLE SCHOOL Subsystem Name Component Name EUL COND NOTES B2020 Exterior Window SELECT TYPE(S) B2020-01 Steel Frame Window 45 P Significant draft felt at majority of windows on all floors and elevations. Staff complains of drafty conditions. B2020-02 Aluminum Frame Window 50 B2020-03 Wood Frame Window 40 B2020-04 Vinyl Frame Window 30 B2020-05 Aluminum Storefront System 50 B2020-06 Metal Framed Curtain Wall 50 B2020-07 Detention Window 45 B2020-08 Storm Window 15 B2020-09 Composite Window 40 B2020-10 Wood Storefront System 40 B2020-11 Glass Block Window 40 B2020-12 Clad Frame Window 40 B2030 Exterior Door SELECT TYPE(S) B2030-01 Aluminum Frame Storefront Door 50 B2030-02 Frameless Glass Storefront Door 50 B2030-03 Automatic Sliding Storefront Door 50 B2030-04 Hollow Metal Door 20 B2030-05 Wood Door 40 B2030-06 Plastic Laminate Door 30 B2030-07 Fiberglass Door 45 B2030-08 Overhead Door 25 B2030-09 Storm Door 15 B2030-10 Steel Detention Door 45 B2030-11 Hinged Emergency Egress Grate 40 B2030-12 Composite Door 40 B2030-13 Residential Sliding Glass Door 15 B2030-14 Fabric / Mesh Door 10 B2030-15 Oversized Metal Hangar Door 30 B2030-16 Sliding Barn Door 50 B2030-17 Basement Access Door 30 B2030-18 Single-Panel Lift Door 30 B2030-19 Steel Frame Storefront Door 30 P Signs of corrosion at base of frame B2030-20 FRP Door 30 B2030-21 Drop-In Kennel Door Closing Panel 20 B2030-22 Steel Door 45 3/31/2026 StudioJAED UNIFORMAT Master Asset List - Copyright 2026 Legend: E = Excellent, G = Good, F = Fair, P = Poor, FD = Failed / Failing, NA = No Access Page 2 of 5
Page 10
2026 Granby MS Facility Condition Assessment ASSET TYPES PRESENT & CONDITION - GRANBY MIDDLE SCHOOL Subsystem Name Component Name EUL COND NOTES B30 Roofing B3010 Roof Covering SELECT TYPE(S) B3010-01 Asphalt / Fiberglass Shingles 20 B3010-02 Slate Shingles 70 B3010-03 Wood Shingles & Shakes 30 B3010-04 Clay Roof Tiles 30 B3010-05 Metal Roof Tiles 40 B3010-06 Metal Roof Panels 40 E Reviewed with drone and photos of areas visible from flat roof B3010-07 Built Up Bituminous Roof 20 B3010-08 Modified Bituminous Roof 20 B3010-09 Elastomeric Roof 15 B3010-10 Coal Tar Roof 28 B3010-11 EPDM Roof 25 E Replaced in 2019 B3010-12 PVC Roof 25 B3010-13 Hypalon Roof 25 B3010-14 Natural Green Roof 25 B3010-15 Inverted Roof Membrane Assembly 40 B3010-16 PMMA Roof Membrane Assembly 20 B3010-17 Unknown Roof Type 0 B3010-18 Concrete Roof 50 B3010-19 Copper Roof 50 B3010-20 Tin Roof 50 B3010-21 Synthetic Slate Roof 90 B3010-22 Asphalt / Fiberglass Shingles Extended Life 30 B3010-23 Fabric Covered Roof 20 B3010-24 Waterproof Roof Membrane Assembly 20 B3020 Roof Opening SELECT TYPE(S) B3020-03 Skylight 30 Special Component Prefabricated Galvanized Cupola 50 G Some peeling paint. No leaks VERTICAL TRANSPORTATION - ASSETS / COMPONENTS D10 Conveying D1010 Elevator & Lift D1010-01 Hydraulic Elevator 25 P Installed in 1992. Nearing end of useful life. Located in A Wing near Nurse and Media Center D1010-02 Electric Traction Elevator 25 D1010-03 Wheelchair Lift 20 3/31/2026 StudioJAED UNIFORMAT Master Asset List - Copyright 2026 Legend: E = Excellent, G = Good, F = Fair, P = Poor, FD = Failed / Failing, NA = No Access Page 3 of 5
Page 11
2026 Granby MS Facility Condition Assessment ASSET TYPES PRESENT & CONDITION - GRANBY MIDDLE SCHOOL Subsystem Name Component Name EUL COND NOTES ELECTRICAL - ASSETS / COMPONENTS D50 Electrical D5010 Electrical Service & Distribution D5010-01 Primary Electrical Service 30 P Outdoor- Owned by Utility Co D5010-02 Primary Transformer 30 P Outdoor- Owned by Utiliyt Co D5010-04 Secondary Transformer 30 P Located Building Wide D5010-05 Main Distribution Panel 30 P Main Elect Rm, 1660 amp 480/277v D5010-06 Main Disconnect Switch 30 P Main Elect Rm , 1600 amp ,FSW D5010-07 Main Switch Gear 30 D5010-08 Motor Control Center 30 D5010-16 Bldg Wide Electrical Service & Distr 40 F D5020 Lighting & Branch Wiring D5020-10 Building Wide General Lighting 20 F D5021 Branch Wiring D5021-03 Building Wide Branch Wiring 40 F D5090 Other Electrical Systems D5090-01 Emergency Generator 25 G FIRE LIFE SAFETY SYSTEM - ASSETS / COMPONENTS D40 Fire Protection D4010 Sprinklers D4010-01 Wet Pipe Sprinkler System 30 D4010-02 Dry Pipe Sprinkler System 30 D4010-03 Fire Pump 15 D4090 Other Fire Protection Systems D4090-01 Kitchen Exhaust Fire Suppression System 15 G Quantity (3) D4090-02 Clean Agent Fire Suppression System 15 D4090-03 Halon Fire Suppression System 15 D50 Electrical D5030 Fire Alarm System D5030-03 Building Wide Fire Alarm System 20 G D5030-04 Head End Central Monitoring Station Sytem 20 D5030-05 Residential Smoke & Heat Detectors 5 MECHANICAL / PLUMBING - ASSETS / COMPONENTS D20 Plumbing D2010 Plumbing Fixtures D2010-01 Building Wide Plumbing Fixtures & Trim 20 G D2020 Domestic Water Distribution D2020-01 Domestic Water Piping & Valves & Insulation 30 G D2020-08 Domestic Water Heater 15 E Total of (5). (3) are tank type electric & (2) are gas fired instantaneous D2020-10 Domestic Hot Water Generator 15 D2030 Sanitary Waste D2030-01 Sanitary Pipe & Fittings 40 G 3/31/2026 StudioJAED UNIFORMAT Master Asset List - Copyright 2026 Legend: E = Excellent, G = Good, F = Fair, P = Poor, FD = Failed / Failing, NA = No Access Page 4 of 5
Page 12
2026 Granby MS Facility Condition Assessment ASSET TYPES PRESENT & CONDITION - GRANBY MIDDLE SCHOOL Subsystem Name Component Name EUL COND NOTES D30 HVAC D3020 Heat Generation D3020-01 Steam Boiler 30 D3020-02 Hot Water Boiler 30 E Quantity (3). B-1, B-2, & B-3 D3020-02 Hot Water Boiler 30 D3020-14 Gas Fired Hot Air Furnace 15 D3020-15 Oil Fired Hot Air Furnace 15 D3030 Refrigeration D3030-01 Chiller 30 D3030-02 Cooling Tower 15 D3040 HVAC Distribution D3040-02 Air Handling Unit 20 F Heat only RTUs. RTU-1, 2, 3, 4, & 8 D3040-02 Air Handling Unit 20 F Quantity (5). AH-1 thru AH-5 D3040-18 Hydronic Distribution Pumps 15 E Quantity (4). P-1, P-2, P-3, & P-4 D3040-20 Heat Exchanger 30 D3040-28 Variable Refrigerant Flow System (VRF) 20 D3040-31 Dedicated Outdoor Air System (DOAS) 15 D3050 Terminal & Packaged Units D3050-01 Packaged Rooftop Air Cond & Heating Unit 15 F Quantity (3). RTU-5, 6, & 7. All have remote condensing units D3050-02 Packaged Rooftop Air Conditioning Unit 15 D3050-03 Packaged Air Conditioning & Heating Unit 15 D3050-04 Packaged Air Conditioning Unit 15 D3050-06 Computer Room Air Conditioning System 15 D3050-07 Computer Room Split System 20 D3050-08 Split System Air Conditioning 10 D3050-10 Heating Only Unit Ventilator 20 D3050-11 Cooling Only Unit Ventilator 20 D3050-12 Heating & Cooling Unit Ventilator 20 D3050-16 Heating Only Fan Coil Unit 20 D3050-17 Cooling Only Fan Coil Unit 20 D3050-18 Heating & Cooling Fan Coil Unit 20 D3050-21 Air to Air Split System Heat Pump 20 F Quantity (2). Ductless D3050-23 Water Source Heat Pump 20 D3060 HVAC Instrum & Controls D3060-01 Pneumatic Control System 15 D3060-02 Electronic Control System 15 F D3060-03 Local Control System 10 F D3090 Other Special HVAC Sys/Equip D3090-02 Laboratory Fume Hood 15 G 3/31/2026 StudioJAED UNIFORMAT Master Asset List - Copyright 2026 Legend: E = Excellent, G = Good, F = Fair, P = Poor, FD = Failed / Failing, NA = No Access Page 5 of 5
Page 13
2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 1 of 19
System Name /
Corrective Action
Correction Notes Primary
Justification
Priority
(Years)
Quantity /
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated
Total Cost
Jun 19, 2026Date Printed:
Area
Name
Granby Middle School
B20 Exterior Enclosure
B2010-03-07C Correct Brick
Masonry Wall Stained Finish
by Cleaning
50Damaged /
Inoperable
P1
Within 1 Yr
East Elevation B Wing
SQFT
$615Building
Exterior
B2010-03-07C Correct Brick
Masonry Wall Stained Finish
by Cleaning
40Damaged /
Inoperable
P1
Within 1 Yr
East Elevation B Wing
(outside Rm 66) SQFT
$492Building
Exterior
B2010-03-07C Correct Brick
Masonry Wall Stained Finish
by Cleaning
50Damaged /
Inoperable
P1
Within 1 Yr
North Elevation B Wing
SQFT
$615Building
Exterior
B2010-03-07C Correct Brick
Masonry Wall Stained Finish
by Cleaning
2,000Damaged /
Inoperable
P1
Within 1 Yr
Northeast interior corner
elevation B wing SQFT
$24,595Building
Exterior
B2010-03-07C Correct Brick
Masonry Wall Stained Finish
by Cleaning
900Damaged /
Inoperable
P1
Within 1 Yr
East Elevation A Wing.
SQFT
$11,068Building
Exterior
B2020-02-01C Correct
Aluminum Frame Window
Deterioration by Demolition &
Replacement
3,500Useful Life P2
Within 3 Yrs
All exterior windows in the
entire building. (Poor
thermal performance,
drafts, and finish has
deteriorated).
SQFT
$929,318Building
Exterior
B2020-05-01C Correct
Aluminum Storefront System
Deterioration by Demolition &
Replacement
440Useful Life P4
Within 10
A & C wings - south
elevation vestibule. SQFT
$248,121Building
Exterior
B2020-05-03C Correct
Aluminum Storefront System
Finish Deterioration by Prep &
Refinish
440Damaged /
Inoperable
P1
Within 1 Yr
A & C wings - south
elevation vestibules. SQFT
$19,178Building
Exterior
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.
CT2000©Page 14
2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 2 of 19
System Name /
Corrective Action
Correction Notes Primary
Justification
Priority
(Years)
Quantity /
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated
Total Cost
Jun 19, 2026Date Printed:
Area
Name
B2020-05-03C Correct
Aluminum Storefront System
Finish Deterioration by Prep &
Refinish
440Damaged /
Inoperable
P2
Within 3 Yrs
Prime and Paint. A & C
wings - South Elevation
vestibules. SQFT
$19,178Building
Wide
B2021-01-07C Correct
Window General Moisture or
Air Infiltration by Recaulking
60Damaged /
Inoperable
P1
Within 1 Yr
A & C Wings - south
elevation vestibules. LNFT
$1,248Building
Exterior
B2021-01-10C Correct
Window General Lintel Finish
Deterioration by Prep &
Refinish
620Damaged /
Inoperable
P2
Within 3 Yrs
All exterior doors and
windows. LNFT
$6,169Building
Exterior
B2021-01-10C Correct
Window General Lintel Finish
Deterioration by Prep &
Refinish
170Damaged /
Inoperable
P2
Within 3 Yrs
At brick on the North and
East exterior elevations of
the Auxiliary Gym and the
West exterior elevations.
LNFT
$1,692Building
Exterior
B2030-04-02C Correct Hollow
Metal Door & Frame
Deterioration by Demolition &
Replacement
1Useful Life P1
Within 1 Yr
Gym Vestibule North
Elevation - (significant
corrosion at base of
frame).
EACH
$9,896Building
Exterior
B2030-04-03C Correct Hollow
Metal Door & Frame Finish
Deterioration by Prep &
Refinish
12Damaged /
Inoperable
P2
Within 3 Yrs
All exterior doors
EACH
$6,857Building
Exterior
B2030-08-02C Correct
Overhead Door & Frame
Deterioration by Demolition &
Replacement
160Useful Life P2
Within 3 Yrs
(1) Maintenance and (1)
Industrial Technology SQFT
$34,854Building
Exterior
Subtotal Estimated Cost: B20 Exterior Enclosure $1,313,895
B30 Roofing
B3060-03-03C Correct
Historic Cupola Deterioration
by Restoration & Refinish
75Damaged /
Inoperable
P1
Within 1 Yr SQFT
$5,097Roof
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.
CT2000©Page 15
2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 3 of 19
System Name /
Corrective Action
Correction Notes Primary
Justification
Priority
(Years)
Quantity /
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated
Total Cost
Jun 19, 2026Date Printed:
Area
Name
Subtotal Estimated Cost: B30 Roofing $5,097
C10 Interior Construction
C1011-01-03C Correct
Accordion Folding Partition Not
Required by Infill
800Damaged /
Inoperable
P3
Within 5 Yrs
Inoperable and not
desired by staff. Remove
and replace with Acoustic
Metal stud and gypsum
board wall. Classrooms
62, 63, 72, 73, 82, and 83.
SQFT
$60,236Classroom
C1011-01-04C Correct
Accordion Folding Partition
Deterioration by Demolition &
Replacement with Operable
Partition
1,800Useful Life P2
Within 3 Yrs
Replace w/ roll down
divider curtain. SQFT
$300,436Gymnasium
C1020-01-01C Correct Hollow
Metal Door Deterioration by
Demolition & Replacement
1Useful Life P2
Within 3 Yrs
A Wing - Choral room to
corridor EACH
$4,523Building
Wide
C1020-01-03C Correct Hollow
Metal Door Finish
Deterioration by Prep &
Refinish
4Damaged /
Inoperable
P2
Within 3 Yrs
B Wing - 6th grade stair
and Northwest Stair - First
and Second Floors. EACH
$2,849Building
Wide
C1020-01-03C Correct Hollow
Metal Door Finish
Deterioration by Prep &
Refinish
145Damaged /
Inoperable
P2
Within 3 Yrs
FRAME ONLY - All
interior door frames in
entire building (does not
include main office). Metal
frames. (47) A wing first
floor, (24) A wing second
floor, (25) B wing first
floor, (23) B wing second
floor, (26) C Wing.
EACH
$103,258Building
Wide
C1020-02-01C Correct Wood
Door Deterioration by
Demolition & Replacement
19Useful Life P4
Within 10
B Wing Second Floor -
Wood veneer door w/
metal frame. EACH
$61,360Building
Wide
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.
CT2000©Page 16
2026 Granby MS Facility Cond AssmtProject Name: Granby Public SchoolsCampus Name: Page 4 of 19 System Name / Corrective Action Correction Notes Primary Justification Priority (Years) Quantity / UOM Capital Renewal & Improvement Report Granby Middle School Estimated Total Cost Jun 19, 2026Date Printed: Area Name C1020-02-01C Correct Wood Door Deterioration by Demolition & Replacement 23Useful Life P4 Within 10 C Wing EACH $74,277Building Wide C1020-02-01C Correct Wood Door Deterioration by Demolition & Replacement 18Useful Life P4 Within 10 A Wing Second Floor - Wood veneer door w/ metal frame. EACH $58,130Building Wide C1020-02-01C Correct Wood Door Deterioration by Demolition & Replacement 18Useful Life P4 Within 10 B Wing Second Floor - Wood veneer door w/ metal frame. EACH $58,130Building Wide C1020-02-01C Correct Wood Door Deterioration by Demolition & Replacement 18Useful Life P2 Within 3 Yrs All toilet rooms and Nurse Supervisor Office - Veneer has been worn or damaaged. Wood veneer door w/ metal frame. (10) A wing first floor and (8) second floor. EACH $58,130Building Wide C1020-02-01C Correct Wood Door Deterioration by Demolition & Replacement 24Useful Life P4 Within 10 A Wing First Floor. Wood veneer door w/ metal frame. EACH $77,507Building Wide C1030-02-01C Correct Toilet Compartment Deterioration by Demolition & Replacement 31Useful Life P4 Within 10 All multiple fixture toilet rooms. EACH $76,231Restroom C1030-07-03C Correct Athletic Locker Deterioration by Demolition & Replacement 333Useful Life P4 Within 10 Girls Locker Room. EACH $436,113Locker Room C1030-07-03C Correct Athletic Locker Deterioration by Demolition & Replacement 336Useful Life P4 Within 10 Boys Locker Room. EACH $440,042Locker Room Subtotal Estimated Cost: C10 Interior Construction $1,811,222 Priority 1 - Work should be performed immediately. (CY' 2027) Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030) Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032) Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037) Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied. CT2000©
Page 17
2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 5 of 19
System Name /
Corrective Action
Correction Notes Primary
Justification
Priority
(Years)
Quantity /
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated
Total Cost
Jun 19, 2026Date Printed:
Area
Name
C20 Stairs & Ramps
C2050-01-03C Correct
Handrail Finish Deterioration
by Prep & Refinish
260Damaged /
Inoperable
P2
Within 3 Yrs
(50 lf) A Wing Open Stair,
(50 lf) A Wing Media
Center, (80 lf) B wing -
Northwest Stair, and (80
lf) 6th grade Stair
LNFT
$8,986Stair Tower
Subtotal Estimated Cost: C20 Stairs & Ramps $8,986
C30 Interior Finishes
C3020-02-01C Correct
Resilient Tile Floor Finish
Deterioration by Demolition &
Replacement
2,400Useful Life P2
Within 3 Yrs
A wing
SQFT
$37,630Cafeteria
C3020-02-01C Correct
Resilient Tile Floor Finish
Deterioration by Demolition &
Replacement
23,600Useful Life P3
Within 5 Yrs
A Wing - First Floor
Nurse, Rms S7 & S8. A
Wing - Second Floor
Room M1-M5. B Wing -
First Floor Rms A1, A3,
A4, 61-68. B Wing -
Second Floor Rms 71-77
and 81-87.
SQFT
$370,029Classroom
C3020-02-01C Correct
Resilient Tile Floor Finish
Deterioration by Demolition &
Replacement
125Useful Life P2
Within 3 Yrs
B Wing - 2nd floor, 6th
grade stair. SQFT
$1,960Stair Tower
C3020-02-01C Correct
Resilient Tile Floor Finish
Deterioration by Demolition &
Replacement
125Useful Life P2
Within 3 Yrs
B wing northwest stair -
2nd floor. SQFT
$1,960Stair Tower
C3020-11-02C Correct Hard
Wood Floor Finish
Deterioration Prep & Refinish
1,500Damaged /
Inoperable
P3
Within 5 Yrs
Auxiliary Gym.
SQFT
$17,750Gymnasium
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.
CT2000©Page 18
2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 6 of 19
System Name /
Corrective Action
Correction Notes Primary
Justification
Priority
(Years)
Quantity /
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated
Total Cost
Jun 19, 2026Date Printed:
Area
Name
C3020-11-02C Correct Hard
Wood Floor Finish
Deterioration Prep & Refinish
6,300Damaged /
Inoperable
P4
Within 10
Main Gym.
SQFT
$74,548Gymnasium
C3020-12-01C Correct Carpet
Floor Finish Deterioration by
Demolition & Replacement
19Useful Life P2
Within 3 Yrs
6th grade stair walk off
carpet - First Floor. SQYD
$3,399Building
Wide
C3020-12-01C Correct Carpet
Floor Finish Deterioration by
Demolition & Replacement
27Useful Life P2
Within 3 Yrs
First floor - (75 sqft)
Office S4, (75 sqft) Office
S3, (75 sqft) Office S5. SQYD
$4,830Building
Wide
C3020-12-01C Correct Carpet
Floor Finish Deterioration by
Demolition & Replacement
29Useful Life P2
Within 3 Yrs
First Floor - Arts Faculty
SQYD
$5,188Building
Wide
C3020-12-01C Correct Carpet
Floor Finish Deterioration by
Demolition & Replacement
29Useful Life P3
Within 5 Yrs
Second Floor - 8th gtrade
counselor office SQYD
$5,188Building
Wide
Subtotal Estimated Cost: C30 Interior Finishes $522,480
D10 Conveying
D1010-01-03C Correct
Hydraulic Passenger Elevator
(2500 Capacity) Deterioration
by Demolition & Replacement
2Useful Life P2
Within 3 Yrs FLR
$175,149Building
Wide
Subtotal Estimated Cost: D10 Conveying $175,149
D20 Plumbing
D2010-01-01C Correct
Building Wide Plumbing
Fixtures & Trim Deterioration
by Demolition & Replacement
(Bldg SF)
73,406Useful Life P4
Within 10 BLDG SF
$382,537Building
Wide
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.
CT2000©Page 19
2026 Granby MS Facility Cond AssmtProject Name: Granby Public SchoolsCampus Name: Page 7 of 19 System Name / Corrective Action Correction Notes Primary Justification Priority (Years) Quantity / UOM Capital Renewal & Improvement Report Granby Middle School Estimated Total Cost Jun 19, 2026Date Printed: Area Name D2020-01-01C Correct Domestic Water Piping & Valves & Insulation Deterioration by Demolition & Replacement (Bldg SF) 73,406Useful Life P4 Within 10 BLDG SF $1,878,279Building Wide D2020-06-01C Correct Plumbing Pump Deterioration by Demolition & Replacement 1Useful Life P4 Within 10 Taco EACH $9,598Boiler Room D2020-08-14C Correct Domestic Water Heater (120 Gal Electric) Deterioration by Demolition & Replacement 3Useful Life P4 Within 10 AO Smith M/N DRE-120 100 DOM 2018 EACH $90,584Boiler Room Subtotal Estimated Cost: D20 Plumbing $2,360,997 D30 HVAC D3010-05-02C Correct Natural Gas Distribution Piping Pipe Surface Deterioration by Prep & Refinish 150Useful Life P3 Within 5 Yrs LNFT $5,851Roof D3030-04-04C Correct Condensing Unit (20 Tons) Deterioration by Demolition & Replacement 1Useful Life P1 Within 1 Yr CU-3 13 Tons connected to RTU-6 McQuay M/N ALP019DS27-ER10 S/N STNU990200141 size taken from original dwgs EACH $73,598Roof D3030-04-04C Correct Condensing Unit (20 Tons) Deterioration by Demolition & Replacement 1Useful Life P1 Within 1 Yr CU-2 18 Tons connected to RTU-5 McQuay M/N unknown S/N unknown size taken from original dwgs EACH $73,598Roof D3030-04-05C Correct Condensing Unit (30 Tons) Deterioration by Demolition & Replacement 1Useful Life P1 Within 1 Yr CU-4 25 Tons connected to RTU-7 McQuay M/N ALP027C-X S/N 5XB0500300 size taken from original dwgs EACH $100,311Roof Priority 1 - Work should be performed immediately. (CY' 2027) Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030) Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032) Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037) Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied. CT2000©
Page 20
2026 Granby MS Facility Cond AssmtProject Name: Granby Public SchoolsCampus Name: Page 8 of 19 System Name / Corrective Action Correction Notes Primary Justification Priority (Years) Quantity / UOM Capital Renewal & Improvement Report Granby Middle School Estimated Total Cost Jun 19, 2026Date Printed: Area Name D3030-04-10C Correct Condensing Unit (80 Tons) Deterioration by Demolition & Replacement 1Useful Life P1 Within 1 Yr CU-1 71 Tons connected to AH-1 McQuay M/N ALP080C S/N 5XA0181800 size taken from original dwgs EACH $196,632Roof D3040-01-01C Correct Supply Fan (.5 HP) Deterioration by Demolition & Replacement 1Useful Life P4 Within 10 Cook Supply for KEF-1 labeled KEF-1 EACH $10,820Roof D3040-01-03C Correct Supply Fan (2 HP) Deterioration by Demolition & Replacement 1Useful Life P2 Within 3 Yrs SF-2 1.5 HP size taken from original dwgs EACH $15,743Roof D3040-02-15C Correct Air Handling Unit (75 Tons) Deterioration by Demolition & Replacement 1Useful Life P2 Within 3 Yrs AH-1 71 Tons McQuay M/N LSL141DH size taken from original dwgs connected to CU-1 EACH $348,366Penthouse D3040-02-20C Correct Air Handling Unit Heating Only (2000 CFM) Deterioration by Demolition & Replacement 1Useful Life P1 Within 1 Yr RTU-1 McQuay 2200 CFM M/N RDS708BY S/N 3XB0041503 EACH $53,922Roof D3040-02-22C Correct Air Handling Unit Heating Only (4000 CFM) Deterioration by Demolition & Replacement 1Useful Life P1 Within 1 Yr RTU-8 3500 CFM McQuay M/N RDS708BY S/N 3XB0042103 EACH $69,850Roof D3040-02-23C Correct Air Handling Unit Heating Only (5000 CFM) Deterioration by Demolition & Replacement 1Useful Life P1 Within 1 Yr RTU-4 McQuay M/N RDS708BY S/N 3XB0041803 EACH $82,413Roof D3040-02-24C Correct Air Handling Unit Heating Only (6000 CFM) Deterioration by Demolition & Replacement 1Useful Life P2 Within 3 Yrs AH-3 5400 CFM McQuay M/N LHD111CH size taken from original dwgs EACH $95,838Penthouse D3040-02-24C Correct Air Handling Unit Heating Only (6000 CFM) Deterioration by Demolition & Replacement 1Useful Life P2 Within 3 Yrs AH-2 McQuay M/N LHD111CH size taken from original dwgs EACH $95,838Penthouse Priority 1 - Work should be performed immediately. (CY' 2027) Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030) Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032) Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037) Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied. CT2000©
Page 21
2026 Granby MS Facility Cond AssmtProject Name: Granby Public SchoolsCampus Name: Page 9 of 19 System Name / Corrective Action Correction Notes Primary Justification Priority (Years) Quantity / UOM Capital Renewal & Improvement Report Granby Middle School Estimated Total Cost Jun 19, 2026Date Printed: Area Name D3040-02-25C Correct Air Handling Unit Heating Only (7000 CFM) Deterioration by Demolition & Replacement 1Useful Life P2 Within 3 Yrs AH-4 6150 CFM McQuay M/N LHD111CH size taken from original dwgs EACH $134,900Penthouse D3040-02-25C Correct Air Handling Unit Heating Only (7000 CFM) Deterioration by Demolition & Replacement 1Useful Life P2 Within 3 Yrs AH-5 6400 CFM McQuay M/N LHD111CH size taken from original dwgs EACH $134,900Penthouse D3040-02-25C Correct Air Handling Unit Heating Only (7000 CFM) Deterioration by Demolition & Replacement 1Useful Life P1 Within 1 Yr RTU-3 McQuay 6500 CFM M/N RDS708BY S/N 3XB0041703 EACH $134,900Roof D3040-02-25C Correct Air Handling Unit Heating Only (7000 CFM) Deterioration by Demolition & Replacement 1Useful Life P1 Within 1 Yr RTU-2 McQuay 6500 CFM M/N RDS708BY S/N 3XB0041603 EACH $134,900Roof D3040-04-01C Correct VAV Terminal Unit Deterioration by Demolition & Replacement 8Useful Life P2 Within 3 Yrs EACH $62,861Building Wide D3040-04-03C Correct VAV Terminal Unit with HW Reheat Deterioration by Demolition & Replacement 20Useful Life P2 Within 3 Yrs EACH $208,056Building Wide D3040-07-03C Correct Return Air or Inline Fan (3 HP) Deterioration by Demolition & Replacement 4Useful Life P2 Within 3 Yrs McQuay RAF-2, RAF-3, RAF-4, & RAF-5 EACH $83,730Penthouse D3040-07-07C Correct Return Air or Inline Fan (15 HP) Deterioration by Demolition & Replacement 1Useful Life P2 Within 3 Yrs RAF-1 McQuay EACH $44,351Penthouse D3040-09-03C Correct Exhaust or Induction Fan (1/5 HP) Deterioration by Demolition & Replacement 5Useful Life P2 Within 3 Yrs 1/6 HP EF-2, 3, 9, 13, & 15 size taken from original dwgs EACH $43,732Roof Priority 1 - Work should be performed immediately. (CY' 2027) Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030) Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032) Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037) Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied. CT2000©
Page 22
2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 10 of 19
System Name /
Corrective Action
Correction Notes Primary
Justification
Priority
(Years)
Quantity /
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated
Total Cost
Jun 19, 2026Date Printed:
Area
Name
D3040-09-05C Correct
Exhaust or Induction Fan (1/2
HP) Deterioration by
Demolition & Replacement
2Useful Life P2
Within 3 Yrs
EF-6 & 10 size taken from
original dwgs EACH
$18,669Roof
D3040-09-05C Correct
Exhaust or Induction Fan (1/2
HP) Deterioration by
Demolition & Replacement
1Useful Life P2
Within 3 Yrs
1/3 HP EF-4 size taken
from original dwgs EACH
$9,335Roof
D3040-09-05C Correct
Exhaust or Induction Fan (1/2
HP) Deterioration by
Demolition & Replacement
2Useful Life P2
Within 3 Yrs
1/4 HP EF-9 & 12 size
taken from original dwgs EACH
$18,669Roof
D3040-09-07C Correct
Exhaust or Induction Fan (3/4
HP) Deterioration by
Demolition & Replacement
3Useful Life P2
Within 3 Yrs
EF-5, 8, & 11 size taken
from original dwgs EACH
$33,219Roof
D3040-09-09C Correct
Exhaust or Induction Fan (1
HP) Deterioration by
Demolition & Replacement
1Useful Life P2
Within 3 Yrs
EF-1 size taken from
original dwgs EACH
$9,293Roof
D3040-09-11C Correct
Exhaust or Induction Fan (3
HP) Deterioration by
Demolition & Replacement
1Useful Life P4
Within 10
KEF-1 Cook
EACH
$12,765Roof
D3040-10-01C Correct Roof
Mounted Gravity Vent
Deterioration by Demolition &
Replacement
5Useful Life P3
Within 5 Yrs EACH
$38,430Roof
D3040-13-04C Correct
Ductwork & Insulation
Deterioration by Duct Cleaning
Building Wide (Bldg SF)
73,406Environ
Imprv
P2
Within 3 Yrs BLDG SF
$273,125Building
Wide
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.
CT2000©Page 23
2026 Granby MS Facility Cond AssmtProject Name: Granby Public SchoolsCampus Name: Page 11 of 19 System Name / Corrective Action Correction Notes Primary Justification Priority (Years) Quantity / UOM Capital Renewal & Improvement Report Granby Middle School Estimated Total Cost Jun 19, 2026Date Printed: Area Name D3040-13-08C Correct Ductwork & Insulation (Exterior) Deterioration by Demolition & Replacement 100Useful Life P1 Within 1 Yr Connected to RTU-7 SQFT $10,637Roof D3050-01-06C Correct Packaged Rooftop Air Conditioning & Heating Unit (15 Ton) Deterioration by Demolition & Replacement 1Useful Life P1 Within 1 Yr RTU-6 13 Tons McQuay M/N RDS708BY S/N 3XB0042003 uses CU-3 EACH $89,563Roof D3050-01-07C Correct Packaged Rooftop Air Conditioning & Heating Unit (20 Ton) Deterioration by Demolition & Replacement 1Useful Life P2 Within 3 Yrs RTU-5 McQuay 18 Tons M/N RDS708BY S/N 3XB0041903 uses CU-2 EACH $130,039Roof D3050-01-08C Correct Packaged Rooftop Air Conditioning & Heating Unit (30 Ton) Deterioration by Demolition & Replacement 1Useful Life P3 Within 5 Yrs RTU-7 McQuay 25 Tons M/N RDS802BY S/N 3XB0043106 uses CU-4 EACH $233,667Roof D3050-19-01C Correct Cabinet Heater Deterioration by Demolition & Replacement 10Useful Life P1 Within 1 Yr Quantity taken from original dwgs EACH $135,552Building Wide D3050-20-04C Correct Steam & Hot Water Unit Heater (200 MBH) Deterioration by Demolition & Replacement 6Useful Life P2 Within 3 Yrs EACH $53,560Gymnasium s D3050-21-11C Correct Ductless Air to Air Split System Heat Pump (1.5 Ton) Deterioration by Demolition & Replacement 1Useful Life P2 Within 3 Yrs Mitsubishi M/N PKA- A18GAL S/N 72A00675B EACH $7,895Audio Visual D3050-21-12C Correct Ductless Air to Air Split System Heat Pump (3 Ton) Deterioration by Demolition & Replacement 1Useful Life P2 Within 3 Yrs Mitsubishi M/N PUG36BKB S/N 01184442 EACH $17,986Technology Lab Priority 1 - Work should be performed immediately. (CY' 2027) Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030) Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032) Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037) Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied. CT2000©
Page 24
2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 12 of 19
System Name /
Corrective Action
Correction Notes Primary
Justification
Priority
(Years)
Quantity /
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated
Total Cost
Jun 19, 2026Date Printed:
Area
Name
D3050-26-01C Correct Steam
or Hot Water Fin-Tube
Radiation Deterioration by
Demolition & Replacement
922Useful Life P2
Within 3 Yrs LNFT
$410,567Building
Wide
D3060-02-03C Correct
Electronic Control (DDC)
System Deterioration by
Demolition & Replacement
(Bldg SF)
55,055Useful Life P1
Within 1 Yr
Honeywell Niagra system
BLDG SF
$1,155,900Building
Wide
D3060-03-02C Correct Local
Control System Deterioration
by Demolition & Replacement
with DDC System
18,352Useful Life P1
Within 1 Yr BLDG SF
$360,172Building
Wide
D3090-01-01C Correct Dust
Collection System
Deterioration by Demolition &
Replacement
1Useful Life P3
Within 5 Yrs
Donldson
EACH
$5,487Exterior
D3090-06-01C Correct
Industrial Air Cleaner
Deterioration by Demolition &
Replacement
2Useful Life P2
Within 3 Yrs
Airomax
EACH
$12,611A2
Technology
Subtotal Estimated Cost: D30 HVAC $5,242,249
D40 Fire Protection
D4010-01-02C Correct Wet
Pipe Sprinkler System
Required by Install New (Bldg
SF)
67,306Best
Practice /
Standard
P2
Within 3 Yrs
Item 1 of 4 required to
provide sprinkler system
in non-sprinklered areas
of building.
BLDG SF
$906,763Building
Wide
D4010-03-09C Correct Diesel
Drive Fire Pump, 60 HP,
Required by Install New
1Best
Practice /
Standard
P2
Within 3 Yrs
Item 3 of 4 required to
provide sprinkler system.
Size is estimated. EACH
$252,530Building
Property
Subtotal Estimated Cost: D40 Fire Protection $1,159,294
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.
CT2000©Page 25
2026 Granby MS Facility Cond AssmtProject Name: Granby Public SchoolsCampus Name: Page 13 of 19 System Name / Corrective Action Correction Notes Primary Justification Priority (Years) Quantity / UOM Capital Renewal & Improvement Report Granby Middle School Estimated Total Cost Jun 19, 2026Date Printed: Area Name D50 Electrical D5010-04-07C Correct Secondary Transformer (45 kVA) Deterioration by Demolition & Replacement 1Useful Life P1 Within 1 Yr Elect Closet Wing A EACH $19,1241st Floor D5010-04-07C Correct Secondary Transformer (45 kVA) Deterioration by Demolition & Replacement 1Useful Life P1 Within 1 Yr EACH $19,124Electrical Room D5010-04-09C Correct Secondary Transformer (112.5 kVA) Deterioration by Demolition & Replacement 1Useful Life P2 Within 3 Yrs EACH $41,068Penthouse D5010-04-10C Correct Secondary Transformer (150 kVA) Deterioration by Demolition & Replacement 1Useful Life P1 Within 1 Yr EACH $43,190Electrical Room D5010-05-05C Correct Main Distribution Panel (1600 AMP) Deterioration by Demolition & Replacement 1Useful Life P1 Within 1 Yr EACH $119,464Electrical Room D5010-06-05C Correct Main Disconnect Switch (1600 AMP) Deterioration by Demolition & Replacement 1Useful Life P1 Within 1 Yr EACH $77,837Electrical Room D5010-08-21C Correct Motor Control Center Variable Frequency Drive (20 HP) Deterioration by Demolition & Replacement 2Useful Life P2 Within 3 Yrs EACH $38,748Penthouse D5010-09-12C Correct Automatic Transfer Switch (1600 AMP) Deterioration by Demolition & Replacement 1Useful Life P4 Within 10 EACH $86,743Electrical Room Priority 1 - Work should be performed immediately. (CY' 2027) Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030) Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032) Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037) Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied. CT2000©
Page 26
2026 Granby MS Facility Cond AssmtProject Name: Granby Public SchoolsCampus Name: Page 14 of 19 System Name / Corrective Action Correction Notes Primary Justification Priority (Years) Quantity / UOM Capital Renewal & Improvement Report Granby Middle School Estimated Total Cost Jun 19, 2026Date Printed: Area Name D5010-10-04C Correct Distribution Wiring Deterioration by Demolition & Replacement (Bldg SF) 73,406Useful Life P3 Within 5 Yrs BLDG SF $1,801,449Building Wide D5010-12-05C Correct Panelboard (225 AMP) Deterioration by Demolition & Replacement 4Useful Life P1 Within 1 Yr Wing B EACH $74,1181st Floor D5010-12-05C Correct Panelboard (225 AMP) Deterioration by Demolition & Replacement 2Useful Life P1 Within 1 Yr Elect Closet Wing A EACH $37,0591st Floor D5010-12-05C Correct Panelboard (225 AMP) Deterioration by Demolition & Replacement 2Useful Life P1 Within 1 Yr Wing B EACH $37,0592nd Floor D5010-12-05C Correct Panelboard (225 AMP) Deterioration by Demolition & Replacement 2Useful Life P1 Within 1 Yr Wing A EACH $37,0592nd Floor D5010-12-05C Correct Panelboard (225 AMP) Deterioration by Demolition & Replacement 4Useful Life P1 Within 1 Yr EACH $74,118Electrical Room D5010-12-05C Correct Panelboard (225 AMP) Deterioration by Demolition & Replacement 2Useful Life P1 Within 1 Yr EACH $37,059Kitchen D5010-12-05C Correct Panelboard (225 AMP) Deterioration by Demolition & Replacement 3Useful Life P2 Within 3 Yrs EACH $55,589Penthouse D5010-14-01C Correct Motor Starter Deterioration by Demolition & Replacement 2Useful Life P1 Within 1 Yr Elect Closet Wing A EACH $31,8231st Floor Priority 1 - Work should be performed immediately. (CY' 2027) Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030) Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032) Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037) Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied. CT2000©
Page 27
2026 Granby MS Facility Cond AssmtProject Name: Granby Public SchoolsCampus Name: Page 15 of 19 System Name / Corrective Action Correction Notes Primary Justification Priority (Years) Quantity / UOM Capital Renewal & Improvement Report Granby Middle School Estimated Total Cost Jun 19, 2026Date Printed: Area Name D5010-14-01C Correct Motor Starter Deterioration by Demolition & Replacement 3Useful Life P1 Within 1 Yr EACH $47,734Electrical Room D5010-14-01C Correct Motor Starter Deterioration by Demolition & Replacement 2Useful Life P1 Within 1 Yr EACH $31,823Kitchen D5010-14-01C Correct Motor Starter Deterioration by Demolition & Replacement 8Useful Life P2 Within 3 Yrs EACH $127,291Penthouse D5010-14-01C Correct Motor Starter Deterioration by Demolition & Replacement 6Useful Life P2 Within 3 Yrs EACH $95,468Penthouse D5010-14-01C Correct Motor Starter Deterioration by Demolition & Replacement 2Useful Life P2 Within 3 Yrs First Floor Wing C EACH $31,823Storage Room D5010-15-01C Correct Disconnect Switch Deterioration by Demolition & Replacement 1Useful Life P1 Within 1 Yr EACH $2,774Electrical Room D5020-10-01C Correct Building Wide General Lighting Inefficient by Demolition & Replacement with Alternative Product (Bldg SF) 73,406Useful Life P3 Within 5 Yrs BLDG SF $1,801,198Building Wide D5020-16-01C Correct Exterior Building Recessed Lighting Deterioration by Demolition & Replacement 7Useful Life P2 Within 3 Yrs EACH $12,460Building Exterior D5020-16-02C Correct Exterior Building Wall Mounted Lighting Deterioration by Demolition & Replacement 26Useful Life P2 Within 3 Yrs EACH $42,647Building Exterior Priority 1 - Work should be performed immediately. (CY' 2027) Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030) Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032) Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037) Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied. CT2000©
Page 28
2026 Granby MS Facility Cond AssmtProject Name: Granby Public SchoolsCampus Name: Page 16 of 19 System Name / Corrective Action Correction Notes Primary Justification Priority (Years) Quantity / UOM Capital Renewal & Improvement Report Granby Middle School Estimated Total Cost Jun 19, 2026Date Printed: Area Name D5020-20-02C Correct Commercial Dimming System (1K - 5K SF) Deterioration by Demolition & Replacement 3,000Useful Life P1 Within 1 Yr Chair Storage rm next to kitchen- Lutorn DP-2 dimming control panel QTY-2 SQFT $35,029Storage Room D5021-01-06C Correct Receptacles (GFCI) Required by Install New 32Useful Life P1 Within 1 Yr Counter top outlets near sink in Science labs. EACH $44,1132nd Floor D5021-03-03C Correct Branch Wiring Deterioration by Demolition & Replacement (BLDG SF) 73,406Useful Life P3 Within 5 Yrs BLDG SF $566,841Building Wide D5031-05-01C Correct Building Wide Security System Deterioration by Demolition & Replacement (Bldg SF) 73,406Useful Life P2 Within 3 Yrs BLDG SF $201,624Building Wide D5031-08-01C Correct Building Wide Video Surveillance System Deterioration by Demolition & Replacement (BLDG SF) 73,406Useful Life P2 Within 3 Yrs BLDG SF $350,392Building Wide D5032-01-02C Correct Master Clock System Deterioration by Demolition & Replacement (Bldg SF) 73,406Useful Life P4 Within 10 BLDG SF $274,934Building Wide D5035-04-01C Correct Building-Wide Telephone System Deterioration by Demolition & Replacement (Bldg SF) 73,406Useful Life P4 Within 10 BLDG SF $454,482Building Wide D5090-04-05C Correct Uninterruptable Power Supply System (10 KVA) Deterioration by Demolition & Replacement 1Useful Life P1 Within 1 Yr Exit/ Em Light battery back -inverter system Dual Lite CD2A-/20-10-S- 277v EACH $51,997Penthouse Priority 1 - Work should be performed immediately. (CY' 2027) Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030) Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032) Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037) Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied. CT2000©
Page 29
2026 Granby MS Facility Cond AssmtProject Name: Granby Public SchoolsCampus Name: Page 17 of 19 System Name / Corrective Action Correction Notes Primary Justification Priority (Years) Quantity / UOM Capital Renewal & Improvement Report Granby Middle School Estimated Total Cost Jun 19, 2026Date Printed: Area Name D5090-05-01C Correct Lighting Timeclock Deterioration by Demolish & Replacement 1Useful Life P1 Within 1 Yr Elect Closet Wing A EACH $2,5941st Floor Subtotal Estimated Cost: D50 Electrical $6,805,852 E20 Furnishings E2010-01-01C Correct Wardrobe Deterioration by Demolition & Replacement 17Useful Life P2 Within 3 Yrs A Wing First Floor - Rms S7 & S8, A Wing Second Floor - Rms M2 & M5, B Wing - First Floor Rms 61- 65, A1-A4 and B Wing Second Floor Rms 71-75 and 81-85. EACH $32,628Building Wide E2010-04-01C Correct Wall Cabinet Deterioration by Demolition & Replacement 156Useful Life P2 Within 3 Yrs (40 lf) A Wing - First Floor - Office Break room, Nurse, (16 lf) A Wing - Second Floor - Work Room, and (100 lf) B Wing - First Floor - Rms A1-A4. LNFT $115,457Building Wide E2010-04-04C Correct Base Cabinet with Laminate Counter Deterioration by Demolition & Replacement with Alternate Material (Solid Surface) 1,273Useful Life P2 Within 3 Yrs (60 lf) A Wing - First Floor - Office Break Room, Nurse, Rms S7 & S8, (23 lf) A Wing - Second Floor - Work Rm, M2 and M5, (550 lf) B Wing - First Floor - Rms 61-65, A1-A4, and (640 lf) B Wing - Second Floor - Rms 71-75, 81-85. LNFT $1,606,025Building Wide E2010-04-11C Correct Laminate Countertop Only Deterioration by Demolition & Replacement 65Useful Life P2 Within 3 Yrs A wing second floor. SQFT $5,245Building Wide Priority 1 - Work should be performed immediately. (CY' 2027) Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030) Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032) Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037) Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied. CT2000©
Page 30
2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 18 of 19
System Name /
Corrective Action
Correction Notes Primary
Justification
Priority
(Years)
Quantity /
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated
Total Cost
Jun 19, 2026Date Printed:
Area
Name
E2010-05-01C Correct
Laboratory Casework
Deterioration by Demolition &
Replacement
222Useful Life P3
Within 5 Yrs
Lower cabinet with epoxy
counter - (72 lf) B wing
first floor and (150 lf) B
wing second floor - Rms
76 & 86.
LNFT
$600,888Building
Wide
E2013-03-07C Correct Indoor
Motorized Telescopic Bleacher
Deterioration by Demolition &
Replacement
450Useful Life P2
Within 3 Yrs SEAT
$419,851Building
Wide
Subtotal Estimated Cost: E20 Furnishings $2,780,095
G20 Site Improvements
G2020-01-02C Correct
Bituminous Parking Lot
Deterioration by Patch & Apply
Sealcoat
600Damaged /
Inoperable
P1
Within 1 Yr
Drive lane @ south
elevation SQYD
$841,320Parking Lot
G2020-01-02C Correct
Bituminous Parking Lot
Deterioration by Patch & Apply
Sealcoat
2,778Damaged /
Inoperable
P2
Within 3 Yrs
North parking lot
SQYD
$3,895,311Parking Lot
G2020-01-02C Correct
Bituminous Parking Lot
Deterioration by Patch & Apply
Sealcoat
223Damaged /
Inoperable
P2
Within 3 Yrs
Drive lane @ loading dock
SQYD
$312,691Parking Lot
G2030-01-03C Correct
Bituminous Sidewalk
Deterioration by Patch & Install
Sealcoat
889Damaged /
Inoperable
P2
Within 3 Yrs
Walkway around building
perimeter. SQYD
$12,469Parking Lot
Subtotal Estimated Cost: G20 Site Improvements $5,061,790
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.
CT2000©Page 31
2026 Granby MS Facility Cond AssmtProject Name:
Granby Public SchoolsCampus Name:
Page 19 of 19
System Name /
Corrective Action
Correction Notes Primary
Justification
Priority
(Years)
Quantity /
UOM
Capital Renewal & Improvement Report
Granby Middle School
Estimated
Total Cost
Jun 19, 2026Date Printed:
Area
Name
G30 Site Civil Mech Utilities
G3010-03-03C Correct Site
Fire Protection Water Service
Piping (6" Pipe) Required by
Install New
365Best
Practice /
Standard
P2
Within 3 Yrs
Item 4 of 4 required to
provide sprinkler system.
Quantity is estimated with
125 LNFT from bldg to
new pump house and 240
LNFT to main line.
LNFT
$74,112Building
Property
Subtotal Estimated Cost: G30 Site Civil Mech Utilities $74,112
H10 Space Requirements
H1010-35-01C Correct Pump
House Required by Add New
180Best
Practice /
Standard
P2
Within 3 Yrs
Item 2 of 4 required to
provide sprinkler system. SQFT
$22,943Building
Property
Subtotal Estimated Cost: H10 Space Requirements $22,943
Z10 General Requirements
Z1040-01-01C Correct
Investigation Consultant
Services Required by
Contracting Appropriate AE
Professionals
6Useful Life P1
Within 1 Yr
Allowance to replace (2)
existing food service /
kitchen serving lines.
Existing units are
inoperable. Quantity is
estimated.
LPSM
$103,950Kitchen
Subtotal Estimated Cost: Z10 General Requirements $103,950
Granby Middle School Total Estimated Cost: $27,448,112
Priority 1 - Work should be performed immediately. (CY' 2027)
Priority 2 - Work should be performed within 1 - 3 years. (CY' 2028 - 2030)
Priority 3 - Work should be performed within 4 - 5 years. (CY' 2031 - 2032)
Priority 4 - Work should be performed within 6 - 10 years. (CY' 2033 - 2037)
Estimated Total Cost is based on unescalated 2026 1st quarter, regionalized data with client approved cost model applied.
CT2000©Page 32
BuildingFullNam BAreaName Ar SystemType SysteSubsyst ComponenCorrectionName Quantity UnitOfMReason Reason1 Priorit Prio CorrectionNotes CorrectionCatego Ye Pr St PrEst Constr Cost Lowst Constr Cost High Granby Middle S M Building Exterior Building Envelope & Structure B20 B2010 E B2010-03 B2010-03-07C Correct Brick Masonry Wall Stained Finish by Cleaning 2,000 SQFT Damaged / Ino 1 P1 Northeast interior corner e Cap Renewal UnNoUn 22,358.80$ 24,594.68$ Granby Middle S M Building Exterior Building Envelope & Structure B20 B2010 E B2010-03 B2010-03-07C Correct Brick Masonry Wall Stained Finish by Cleaning 900 SQFT Damaged / Ino 1 P1 East Elevation A Wing. Cap Renewal UnNoUn 10,061.46$ 11,067.61$ Granby Middle S M Building Exterior Building Envelope & Structure B20 B2010 E B2010-03 B2010-03-07C Correct Brick Masonry Wall Stained Finish by Cleaning 50 SQFT Damaged / Ino 1 P1 East Elevation B Wing Cap Renewal UnNoUn 558.97$ 614.87$ Granby Middle S M Building Exterior Building Envelope & Structure B20 B2010 E B2010-03 B2010-03-07C Correct Brick Masonry Wall Stained Finish by Cleaning 50 SQFT Damaged / Ino 1 P1 North Elevation B Wing Cap Renewal UnNoUn 558.97$ 614.87$ Granby Middle S M Building Exterior Building Envelope & Structure B20 B2010 E B2010-03 B2010-03-07C Correct Brick Masonry Wall Stained Finish by Cleaning 40 SQFT Damaged / Ino 1 P1 East Elevation B Wing (outs Cap Renewal UnNoUn 447.18$ 491.89$ Granby Middle S M Building Exterior Building Envelope & Structure B20 B2020 E B2020-02 A B2020-02-01C Correct Aluminum Frame Window Deterioration by Demolition & Replac 3,500 SQFT Useful Life 2 P2 All exterior windows in the Cap Renewal UnNoUn 844,834.90$ 929,318.39$ Granby Middle S M Building Exterior Building Envelope & Structure B20 B2020 E B2020-05 A B2020-05-01C Correct Aluminum Storefront System Deterioration by Demolition & Rep 440 SQFT Useful Life 4 P4 A & C wings - south elevatio Cap Renewal UnNoUn 225,564.24$ 248,120.66$ Granby Middle S M Building Wide Building Envelope & Structure B20 B2020 E B2020-05 A B2020-05-03C Correct Aluminum Storefront System Finish Deterioration by Prep & Ref 440 SQFT Damaged / Ino 2 P2 Prime and Paint. A & C wing Cap Renewal UnNoUn 17,434.52$ 19,177.97$ Granby Middle S M Building Exterior Building Envelope & Structure B20 B2020 E B2020-05 A B2020-05-03C Correct Aluminum Storefront System Finish Deterioration by Prep & Ref 440 SQFT Damaged / Ino 1 P1 A & C wings - south elevatio Cap Renewal UnNoUn 17,434.52$ 19,177.97$ Granby Middle S M Building Exterior Building Envelope & Structure B20 B2021 E B2021-01 B2021-01-07C Correct Window General Moisture or Air Infiltration by Recaulking 60 LNFT Damaged / Ino 1 P1 A & C Wings - south elevati Cap Renewal UnNoUn 1,134.14$ 1,247.56$ Granby Middle S M Building Exterior Building Envelope & Structure B20 B2021 E B2021-01 B2021-01-10C Correct Window General Lintel Finish Deterioration by Prep & Refinish 620 LNFT Damaged / Ino 2 P2 All exterior doors and wind Cap Renewal UnNoUn 5,608.52$ 6,169.37$ Granby Middle S M Building Exterior Building Envelope & Structure B20 B2021 E B2021-01 B2021-01-10C Correct Window General Lintel Finish Deterioration by Prep & Refinish 170 LNFT Damaged / Ino 2 P2 At brick on the North and E Cap Renewal UnNoUn 1,537.82$ 1,691.60$ Granby Middle S M Building Exterior Building Envelope & Structure B20 B2030 E B2030-04 B2030-04-02C Correct Hollow Metal Door & Frame Deterioration by Demolition & Repl 1 EACH Useful Life 1 P1 Gym Vestibule North Elevat Cap Renewal UnNoUn 8,996.52$ 9,896.17$ Granby Middle S M Building Exterior Building Envelope & Structure B20 B2030 E B2030-04 B2030-04-03C Correct Hollow Metal Door & Frame Finish Deterioration by Prep & Refin 12 EACH Damaged / Ino 2 P2 All exterior doors Cap Renewal UnNoUn 6,233.51$ 6,856.86$ Granby Middle S M Building Exterior Building Envelope & Structure B20 B2030 E B2030-08 B2030-08-02C Correct Overhead Door & Frame Deterioration by Demolition & Replace 160 SQFT Useful Life 2 P2 (1) Maintenance and (1) Ind Cap Renewal UnNoUn 31,685.84$ 34,854.42$ Granby Middle S M Roof Building Envelope & Structure B30 B3060 R B3060-03 B3060-03-03C Correct Historic Cupola Deterioration by Restoration & Refinish 75 SQFT Damaged / Ino 1 P1 Cap Renewal UnNoUn 4,633.58$ 5,096.93$ Granby Middle S M Classroom Architectural Interiors & Finishes C10 C1011 I C1011-01 A C1011-01-03C Correct Accordion Folding Partition Not Required by Infill 800 SQFT Damaged / Ino 3 P3 Inoperable and not desired Cap Renewal UnNoUn 54,759.60$ 60,235.56$ Granby Middle S M Gymnasium Architectural Interiors & Finishes C10 C1011 I C1011-01 A C1011-01-04C Correct Accordion Folding Partition Deterioration by Demolition & Repla 1,800 SQFT Useful Life 2 P2 Replace w/ roll down divide Cap Renewal UnNoUn 273,123.90$ 300,436.29$ Granby Middle S M Building Wide Architectural Interiors & Finishes C10 C1020 I C1020-01 C1020-01-01C Correct Hollow Metal Door Deterioration by Demolition & Replacement 1 EACH Useful Life 2 P2 A Wing - Choral room to co Cap Renewal UnNoUn 4,111.92$ 4,523.11$ Granby Middle S M Building Wide Architectural Interiors & Finishes C10 C1020 I C1020-01 C1020-01-03C Correct Hollow Metal Door Finish Deterioration by Prep & Refinish 145 EACH Damaged / Ino 2 P2 FRAME ONLY - All interior d Cap Renewal UnNoUn 93,871.26$ 103,258.39$ Granby Middle S M Building Wide Architectural Interiors & Finishes C10 C1020 I C1020-01 C1020-01-03C Correct Hollow Metal Door Finish Deterioration by Prep & Refinish 4 EACH Damaged / Ino 2 P2 B Wing - 6th grade stair and Cap Renewal UnNoUn 2,589.55$ 2,848.51$ Granby Middle S M Building Wide Architectural Interiors & Finishes C10 C1020 I C1020-02 W C1020-02-01C Correct Wood Door Deterioration by Demolition & Replacement 24 EACH Useful Life 4 P4 A Wing First Floor. Wood ve Cap Renewal UnNoUn 70,460.71$ 77,506.78$ Granby Middle S M Building Wide Architectural Interiors & Finishes C10 C1020 I C1020-02 W C1020-02-01C Correct Wood Door Deterioration by Demolition & Replacement 23 EACH Useful Life 4 P4 C Wing Cap Renewal UnNoUn 67,524.85$ 74,277.33$ Granby Middle S M Building Wide Architectural Interiors & Finishes C10 C1020 I C1020-02 W C1020-02-01C Correct Wood Door Deterioration by Demolition & Replacement 19 EACH Useful Life 4 P4 B Wing Second Floor - Woo Cap Renewal UnNoUn 55,781.40$ 61,359.54$ Granby Middle S M Building Wide Architectural Interiors & Finishes C10 C1020 I C1020-02 W C1020-02-01C Correct Wood Door Deterioration by Demolition & Replacement 18 EACH Useful Life 2 P2 All toilet rooms and Nurse S Cap Renewal UnNoUn 52,845.53$ 58,130.09$ Granby Middle S M Building Wide Architectural Interiors & Finishes C10 C1020 I C1020-02 W C1020-02-01C Correct Wood Door Deterioration by Demolition & Replacement 18 EACH Useful Life 4 P4 A Wing Second Floor - Woo Cap Renewal UnNoUn 52,845.53$ 58,130.09$ Granby Middle S M Building Wide Architectural Interiors & Finishes C10 C1020 I C1020-02 W C1020-02-01C Correct Wood Door Deterioration by Demolition & Replacement 18 EACH Useful Life 4 P4 B Wing Second Floor - Woo Cap Renewal UnNoUn 52,845.53$ 58,130.09$ Granby Middle S M Restroom Architectural Interiors & Finishes C10 C1030 F C1030-02 T C1030-02-01C Correct Toilet Compartment Deterioration by Demolition & Replacemen 31 EACH Useful Life 4 P4 All multiple fixture toilet rooCap Renewal UnNoUn 69,301.23$ 76,231.35$ Granby Middle S M Locker Room Architectural Interiors & Finishes C10 C1030 F C1030-07 C1030-07-03C Correct Athletic Locker Deterioration by Demolition & Replacement 336 EACH Useful Life 4 P4 Boys Locker Room. Cap Renewal UnNoUn 400,038.17$ 440,041.99$ Granby Middle S M Locker Room Architectural Interiors & Finishes C10 C1030 F C1030-07 C1030-07-03C Correct Athletic Locker Deterioration by Demolition & Replacement 333 EACH Useful Life 4 P4 Girls Locker Room. Cap Renewal UnNoUn 396,466.40$ 436,113.04$ Granby Middle S M Stair Tower Architectural Interiors & Finishes C20 C2050 I C2050-01 C2050-01-03C Correct Handrail Finish Deterioration by Prep & Refinish 260 LNFT Damaged / Ino 2 P2 (50 lf) A Wing Open Stair, (5 Cap Renewal UnNoUn 8,169.54$ 8,986.49$ Granby Middle S M Classroom Architectural Interiors & Finishes C30 C3020 F C3020-02 C3020-02-01C Correct Resilient Tile Floor Finish Deterioration by Demolition & Replace 23,600 SQFT Useful Life 3 P3 A Wing - First Floor Nurse, R Cap Renewal UnNoUn 336,389.68$ 370,028.65$ Granby Middle S M Cafeteria Architectural Interiors & Finishes C30 C3020 F C3020-02 C3020-02-01C Correct Resilient Tile Floor Finish Deterioration by Demolition & Replace 2,400 SQFT Useful Life 2 P2 A wing Cap Renewal UnNoUn 34,209.12$ 37,630.03$ Granby Middle S M Stair Tower Architectural Interiors & Finishes C30 C3020 F C3020-02 C3020-02-01C Correct Resilient Tile Floor Finish Deterioration by Demolition & Replace 125 SQFT Useful Life 2 P2 B Wing - 2nd floor, 6th grad Cap Renewal UnNoUn 1,781.73$ 1,959.90$ Granby Middle S M Stair Tower Architectural Interiors & Finishes C30 C3020 F C3020-02 C3020-02-01C Correct Resilient Tile Floor Finish Deterioration by Demolition & Replace 125 SQFT Useful Life 2 P2 B wing northwest stair - 2nd Cap Renewal UnNoUn 1,781.73$ 1,959.90$ Granby Middle S M Gymnasium Architectural Interiors & Finishes C30 C3020 F C3020-11 C3020-11-02C Correct Hard Wood Floor Finish Deterioration Prep & Refinish 6,300 SQFT Damaged / Ino 4 P4 Main Gym. Cap Renewal UnNoUn 67,770.99$ 74,548.09$ Granby Middle S M Gymnasium Architectural Interiors & Finishes C30 C3020 F C3020-11 C3020-11-02C Correct Hard Wood Floor Finish Deterioration Prep & Refinish 1,500 SQFT Damaged / Ino 3 P3 Auxiliary Gym. Cap Renewal UnNoUn 16,135.95$ 17,749.55$ Granby Middle S M Building Wide Architectural Interiors & Finishes C30 C3020 F C3020-12 C C3020-12-01C Correct Carpet Floor Finish Deterioration by Demolition & Replacement 29 SQYD Useful Life 3 P3 Second Floor - 8th gtrade co Cap Renewal UnNoUn 4,715.94$ 5,187.54$ Granby Middle S M Building Wide Architectural Interiors & Finishes C30 C3020 F C3020-12 C C3020-12-01C Correct Carpet Floor Finish Deterioration by Demolition & Replacement 29 SQYD Useful Life 2 P2 First Floor - Arts Faculty Cap Renewal UnNoUn 4,715.94$ 5,187.54$ Granby Middle S M Building Wide Architectural Interiors & Finishes C30 C3020 F C3020-12 C C3020-12-01C Correct Carpet Floor Finish Deterioration by Demolition & Replacement 27 SQYD Useful Life 2 P2 First floor - (75 sqft) Office S Cap Renewal UnNoUn 4,390.70$ 4,829.78$ Granby Middle S M Building Wide Architectural Interiors & Finishes C30 C3020 F C3020-12 C C3020-12-01C Correct Carpet Floor Finish Deterioration by Demolition & Replacement 19 SQYD Useful Life 2 P2 6th grade stair walk off carp Cap Renewal UnNoUn 3,089.76$ 3,398.73$ Granby Middle S M Building Wide Elevators & Lifts D10 D1010 D1010-01 D1010-01-03C Correct Hydraulic Passenger Elevator (2500 Capacity) Deterioration by D 2 FLR Useful Life 2 P2 Cap Renewal UnNoUn 159,226.80$ 175,149.48$ Granby Middle S M Building Wide Mechanical & Plumbing D20 D2010 D2010-01 D2010-01-01C Correct Building Wide Plumbing Fixtures & Trim Deterioration by Demol 73,406 BLDG SF Useful Life 4 P4 Cap Renewal UnNoUn 347,760.93$ 382,537.02$ Granby Middle S M Building Wide Mechanical & Plumbing D20 D2020 D2020-01 D2020-01-01C Correct Domestic Water Piping & Valves & Insulation Deterioration by D 73,406 BLDG SF Useful Life 4 P4 Cap Renewal UnNoUn 1,707,526.33$ 1,878,278.96$ Granby Middle S M Boiler Room Mechanical & Plumbing D20 D2020 D2020-06 D2020-06-01C Correct Plumbing Pump Deterioration by Demolition & Replacement 1 EACH Useful Life 4 P4 Taco Cap Renewal UnNoUn 8,725.07$ 9,597.58$ Granby Middle S M Boiler Room Mechanical & Plumbing D20 D2020 D2020-08 D2020-08-14C Correct Domestic Water Heater (120 Gal Electric) Deterioration by Demo 3 EACH Useful Life 4 P4 AO Smith M/N DRE-120 100 Cap Renewal UnNoUn 82,348.89$ 90,583.78$ Granby Middle S M Roof Mechanical & Plumbing D30 D3010 D3010-05 D3010-05-02C Correct Natural Gas Distribution Piping Pipe Surface Deterioration by Pr 150 LNFT Useful Life 3 P3 Cap Renewal UnNoUn 5,319.02$ 5,850.92$ Granby Middle S M Roof Mechanical & Plumbing D30 D3030 D3030-04 D3030-04-04C Correct Condensing Unit (20 Tons) Deterioration by Demolition & Replac 1 EACH Useful Life 1 P1 CU-3 13 Tons connected to Cap Renewal UnNoUn 66,906.93$ 73,597.62$ Granby Middle S M Roof Mechanical & Plumbing D30 D3030 D3030-04 D3030-04-04C Correct Condensing Unit (20 Tons) Deterioration by Demolition & Replac 1 EACH Useful Life 1 P1 CU-2 18 Tons connected to Cap Renewal UnNoUn 66,906.93$ 73,597.62$ Granby Middle S M Roof Mechanical & Plumbing D30 D3030 D3030-04 D3030-04-05C Correct Condensing Unit (30 Tons) Deterioration by Demolition & Replac 1 EACH Useful Life 1 P1 CU-4 25 Tons connected to Cap Renewal UnNoUn 91,191.54$ 100,310.69$ Granby Middle S M Roof Mechanical & Plumbing D30 D3030 D3030-04 D3030-04-10C Correct Condensing Unit (80 Tons) Deterioration by Demolition & Replac 1 EACH Useful Life 1 P1 CU-1 71 Tons connected to Cap Renewal UnNoUn 178,756.03$ 196,631.63$ Granby Middle S M Roof Mechanical & Plumbing D30 D3040 D3040-01 D3040-01-01C Correct Supply Fan (.5 HP) Deterioration by Demolition & Replacement 1 EACH Useful Life 4 P4 Cook Supply for KEF-1 label Cap Renewal UnNoUn 9,836.45$ 10,820.09$ Granby Middle S M Roof Mechanical & Plumbing D30 D3040 D3040-01 D3040-01-03C Correct Supply Fan (2 HP) Deterioration by Demolition & Replacement 1 EACH Useful Life 2 P2 SF-2 1.5 HP size taken from Cap Renewal UnNoUn 14,311.47$ 15,742.62$ Granby Middle S M Penthouse Mechanical & Plumbing D30 D3040 D3040-02 D3040-02-15C Correct Air Handling Unit (75 Tons) Deterioration by Demolition & Repla 1 EACH Useful Life 2 P2 AH-1 71 Tons McQuay M/N Cap Renewal UnNoUn 316,696.74$ 348,366.42$ Granby Middle S M Roof Mechanical & Plumbing D30 D3040 D3040-02 D3040-02-20C Correct Air Handling Unit Heating Only (2000 CFM) Deterioration by Dem 1 EACH Useful Life 1 P1 RTU-1 McQuay 2200 CFM M Cap Renewal UnNoUn 49,019.76$ 53,921.73$ Granby Middle S M Roof Mechanical & Plumbing D30 D3040 D3040-02 D3040-02-22C Correct Air Handling Unit Heating Only (4000 CFM) Deterioration by Dem 1 EACH Useful Life 1 P1 RTU-8 3500 CFM McQuay M Cap Renewal UnNoUn 63,499.61$ 69,849.57$ Granby Middle S M Roof Mechanical & Plumbing D30 D3040 D3040-02 D3040-02-23C Correct Air Handling Unit Heating Only (5000 CFM) Deterioration by Dem 1 EACH Useful Life 1 P1 RTU-4 McQuay M/N RDS70 Cap Renewal UnNoUn 74,921.26$ 82,413.39$ Granby Middle S M Penthouse Mechanical & Plumbing D30 D3040 D3040-02 D3040-02-24C Correct Air Handling Unit Heating Only (6000 CFM) Deterioration by Dem 1 EACH Useful Life 2 P2 AH-3 5400 CFM McQuay M Cap Renewal UnNoUn 87,125.40$ 95,837.94$ Granby Middle S M Penthouse Mechanical & Plumbing D30 D3040 D3040-02 D3040-02-24C Correct Air Handling Unit Heating Only (6000 CFM) Deterioration by Dem 1 EACH Useful Life 2 P2 AH-2 McQuay M/N LHD111 Cap Renewal UnNoUn 87,125.40$ 95,837.94$ Granby Middle S M Roof Mechanical & Plumbing D30 D3040 D3040-02 D3040-02-25C Correct Air Handling Unit Heating Only (7000 CFM) Deterioration by Dem 1 EACH Useful Life 1 P1 RTU-3 McQuay 6500 CFM M Cap Renewal UnNoUn 122,636.19$ 134,899.81$ Granby Middle S M Penthouse Mechanical & Plumbing D30 D3040 D3040-02 D3040-02-25C Correct Air Handling Unit Heating Only (7000 CFM) Deterioration by Dem 1 EACH Useful Life 2 P2 AH-4 6150 CFM McQuay M Cap Renewal UnNoUn 122,636.19$ 134,899.81$ Granby Middle S M Penthouse Mechanical & Plumbing D30 D3040 D3040-02 D3040-02-25C Correct Air Handling Unit Heating Only (7000 CFM) Deterioration by Dem 1 EACH Useful Life 2 P2 AH-5 6400 CFM McQuay M Cap Renewal UnNoUn 122,636.19$ 134,899.81$ Granby Middle S M Roof Mechanical & Plumbing D30 D3040 D3040-02 D3040-02-25C Correct Air Handling Unit Heating Only (7000 CFM) Deterioration by Dem 1 EACH Useful Life 1 P1 RTU-2 McQuay 6500 CFM M Cap Renewal UnNoUn 122,636.19$ 134,899.81$ Granby Middle S M Building Wide Mechanical & Plumbing D30 D3040 D3040-04 D3040-04-01C Correct VAV Terminal Unit Deterioration by Demolition & Replacement 8 EACH Useful Life 2 P2 Cap Renewal UnNoUn 57,146.79$ 62,861.47$ Granby Middle S M Building Wide Mechanical & Plumbing D30 D3040 D3040-04 D3040-04-03C Correct VAV Terminal Unit with HW Reheat Deterioration by Demolition 20 EACH Useful Life 2 P2 Cap Renewal UnNoUn 189,141.40$ 208,055.54$ Granby Middle S M Penthouse Mechanical & Plumbing D30 D3040 D3040-07 D3040-07-03C Correct Return Air or Inline Fan (3 HP) Deterioration by Demolition & Re 4 EACH Useful Life 2 P2 McQuay RAF-2, RAF-3, RAF- Cap Renewal UnNoUn 76,118.58$ 83,730.44$ Granby Middle S M Penthouse Mechanical & Plumbing D30 D3040 D3040-07 D3040-07-07C Correct Return Air or Inline Fan (15 HP) Deterioration by Demolition & R 1 EACH Useful Life 2 P2 RAF-1 McQuay Cap Renewal UnNoUn 40,318.86$ 44,350.74$ Granby Middle S M Roof Mechanical & Plumbing D30 D3040 D3040-09 D3040-09-03C Correct Exhaust or Induction Fan (1/5 HP) Deterioration by Demolition & 5 EACH Useful Life 2 P2 1/6 HP EF-2, 3, 9, 13, & 15 s Cap Renewal UnNoUn 39,756.38$ 43,732.02$ Granby Middle S M Roof Mechanical & Plumbing D30 D3040 D3040-09 D3040-09-05C Correct Exhaust or Induction Fan (1/2 HP) Deterioration by Demolition & 2 EACH Useful Life 2 P2 EF-6 & 10 size taken from o Cap Renewal UnNoUn 16,972.19$ 18,669.41$ Granby Middle S M Roof Mechanical & Plumbing D30 D3040 D3040-09 D3040-09-05C Correct Exhaust or Induction Fan (1/2 HP) Deterioration by Demolition & 2 EACH Useful Life 2 P2 1/4 HP EF-9 & 12 size taken Cap Renewal UnNoUn 16,972.19$ 18,669.41$ Granby Middle S M Roof Mechanical & Plumbing D30 D3040 D3040-09 D3040-09-05C Correct Exhaust or Induction Fan (1/2 HP) Deterioration by Demolition & 1 EACH Useful Life 2 P2 1/3 HP EF-4 size taken from Cap Renewal UnNoUn 8,486.10$ 9,334.71$ Granby Middle S M Roof Mechanical & Plumbing D30 D3040 D3040-09 D3040-09-07C Correct Exhaust or Induction Fan (3/4 HP) Deterioration by Demolition & 3 EACH Useful Life 2 P2 EF-5, 8, & 11 size taken from Cap Renewal UnNoUn 30,198.92$ 33,218.81$ Granby Middle S M Roof Mechanical & Plumbing D30 D3040 D3040-09 D3040-09-09C Correct Exhaust or Induction Fan (1 HP) Deterioration by Demolition & R 1 EACH Useful Life 2 P2 EF-1 size taken from origina Cap Renewal UnNoUn 8,447.94$ 9,292.74$ Granby Middle S M Roof Mechanical & Plumbing D30 D3040 D3040-09 D3040-09-11C Correct Exhaust or Induction Fan (3 HP) Deterioration by Demolition & R 1 EACH Useful Life 4 P4 KEF-1 Cook Cap Renewal UnNoUn 11,604.64$ 12,765.11$ Granby Middle S M Roof Mechanical & Plumbing D30 D3040 D3040-10 D3040-10-01C Correct Roof Mounted Gravity Vent Deterioration by Demolition & Repla 5 EACH Useful Life 3 P3 Cap Renewal UnNoUn 34,936.36$ 38,430.00$ Granby Middle S M Building Wide Mechanical & Plumbing D30 D3040 D3040-13 D3040-13-04C Correct Ductwork & Insulation Deterioration by Duct Cleaning Building W 73,406 BLDG SF Environ Imprv 2 P2 Cap Renewal UnNoUn 248,295.80$ 273,125.37$ Granby Middle S M Roof Mechanical & Plumbing D30 D3040 D3040-13 D3040-13-08C Correct Ductwork & Insulation (Exterior) Deterioration by Demolition & 100 SQFT Useful Life 1 P1 Connected to RTU-7 Cap Renewal UnNoUn 9,669.77$ 10,636.75$ Granby Middle S M Roof Mechanical & Plumbing D30 D3050 T D3050-01 D3050-01-06C Correct Packaged Rooftop Air Conditioning & Heating Unit (15 Ton) Dete 1 EACH Useful Life 1 P1 RTU-6 13 Tons McQuay M/ Cap Renewal UnNoUn 81,421.02$ 89,563.12$
Page 33
Granby Middle S M Roof Mechanical & Plumbing D30 D3050 T D3050-01 D3050-01-07C Correct Packaged Rooftop Air Conditioning & Heating Unit (20 Ton) Dete 1 EACH Useful Life 2 P2 RTU-5 McQuay 18 Tons M/ Cap Renewal UnNoUn 118,217.46$ 130,039.20$ Granby Middle S M Roof Mechanical & Plumbing D30 D3050 T D3050-01 D3050-01-08C Correct Packaged Rooftop Air Conditioning & Heating Unit (30 Ton) Dete 1 EACH Useful Life 3 P3 RTU-7 McQuay 25 Tons M/ Cap Renewal UnNoUn 212,424.93$ 233,667.43$ Granby Middle S M Building Wide Mechanical & Plumbing D30 D3050 T D3050-19 D3050-19-01C Correct Cabinet Heater Deterioration by Demolition & Replacement 10 EACH Useful Life 1 P1 Quantity taken from origina Cap Renewal UnNoUn 123,229.33$ 135,552.26$ Granby Middle S M Gymnasiums Mechanical & Plumbing D30 D3050 T D3050-20 D3050-20-04C Correct Steam & Hot Water Unit Heater (200 MBH) Deterioration by Dem 6 EACH Useful Life 2 P2 Cap Renewal UnNoUn 48,691.06$ 53,560.17$ Granby Middle S M Audio Visual Mechanical & Plumbing D30 D3050 T D3050-21 D3050-21-11C Correct Ductless Air to Air Split System Heat Pump (1.5 Ton) Deterioratio 1 EACH Useful Life 2 P2 Mitsubishi M/N PKA-A18GA Cap Renewal UnNoUn 7,177.21$ 7,894.93$ Granby Middle S M Technology Lab Mechanical & Plumbing D30 D3050 T D3050-21 D3050-21-12C Correct Ductless Air to Air Split System Heat Pump (3 Ton) Deterioration 1 EACH Useful Life 2 P2 Mitsubishi M/N PUG36BKB Cap Renewal UnNoUn 16,350.71$ 17,985.78$ Granby Middle S M Building Wide Mechanical & Plumbing D30 D3050 T D3050-26 D3050-26-01C Correct Steam or Hot Water Fin-Tube Radiation Deterioration by Demol 922 LNFT Useful Life 2 P2 Cap Renewal UnNoUn 373,242.66$ 410,566.92$ Granby Middle S M Building Wide Mechanical & Plumbing D30 D3060 D3060-02 D3060-02-03C Correct Electronic Control (DDC) System Deterioration by Demolition & 55,055 BLDG SF Useful Life 1 P1 Honeywell Niagra system Cap Renewal UnNoUn 1,050,818.27$ 1,155,900.10$ Granby Middle S M Building Wide Mechanical & Plumbing D30 D3060 D3060-03 D3060-03-02C Correct Local Control System Deterioration by Demolition & Replacemen 18,352 BLDG SF Useful Life 1 P1 Cap Renewal UnNoUn 327,429.04$ 360,171.95$ Granby Middle S M Exterior Mechanical & Plumbing D30 D3090 O D3090-01 D3090-01-01C Correct Dust Collection System Deterioration by Demolition & Replacem 1 EACH Useful Life 3 P3 Donldson Cap Renewal UnNoUn 4,987.75$ 5,486.52$ Granby Middle S M A2 Technology Mechanical & Plumbing D30 D3090 O D3090-06 D3090-06-01C Correct Industrial Air Cleaner Deterioration by Demolition & Replaceme 2 EACH Useful Life 2 P2 Airomax Cap Renewal UnNoUn 11,464.68$ 12,611.15$ Granby Middle S M Building Wide Fire Alarm & Protection D40 D4010 SD4010-01 D4010-01-02C Correct Wet Pipe Sprinkler System Required by Install New (Bldg SF) 67,306 BLDG SF Best Practice / Life Safety 2 P2 Item 1 of 4 required to prov Cap Imprv UnNoUn 824,330.24$ 906,763.26$ Granby Middle S M Building Property Fire Alarm & Protection D40 D4010 SD4010-03 D4010-03-09C Correct Diesel Drive Fire Pump, 60 HP, Required by Install New 1 EACH Best Practice / Life Safety 2 P2 Item 3 of 4 required to prov Cap Imprv UnNoUn 229,573.06$ 252,530.36$ Granby Middle S M 1st Floor Electrical, Technology, & Security D50 D5010 D5010-04 D5010-04-07C Correct Secondary Transformer (45 kVA) Deterioration by Demolition & 1 EACH Useful Life 1 P1 Elect Closet Wing A Cap Renewal UnNoUn 17,385.11$ 19,123.62$ Granby Middle S M Electrical Room Electrical, Technology, & Security D50 D5010 D5010-04 D5010-04-07C Correct Secondary Transformer (45 kVA) Deterioration by Demolition & 1 EACH Useful Life 1 P1 Cap Renewal UnNoUn 17,385.11$ 19,123.62$ Granby Middle S M Penthouse Electrical, Technology, & Security D50 D5010 D5010-04 D5010-04-09C Correct Secondary Transformer (112.5 kVA) Deterioration by Demolition 1 EACH Useful Life 2 P2 Cap Renewal UnNoUn 37,334.22$ 41,067.64$ Granby Middle S M Electrical Room Electrical, Technology, & Security D50 D5010 D5010-04 D5010-04-10C Correct Secondary Transformer (150 kVA) Deterioration by Demolition & 1 EACH Useful Life 1 P1 Cap Renewal UnNoUn 39,263.29$ 43,189.62$ Granby Middle S M Electrical Room Electrical, Technology, & Security D50 D5010 D5010-05 D5010-05-05C Correct Main Distribution Panel (1600 AMP) Deterioration by Demolition 1 EACH Useful Life 1 P1 Cap Renewal UnNoUn 108,603.68$ 119,464.04$ Granby Middle S M Electrical Room Electrical, Technology, & Security D50 D5010 D5010-06 D5010-06-05C Correct Main Disconnect Switch (1600 AMP) Deterioration by Demolitio 1 EACH Useful Life 1 P1 Cap Renewal UnNoUn 70,760.77$ 77,836.85$ Granby Middle S M Penthouse Electrical, Technology, & Security D50 D5010 D5010-08 D5010-08-21C Correct Motor Control Center Variable Frequency Drive (20 HP) Deterior 2 EACH Useful Life 2 P2 Cap Renewal UnNoUn 35,225.33$ 38,747.86$ Granby Middle S M Electrical Room Electrical, Technology, & Security D50 D5010 D5010-09 D5010-09-12C Correct Automatic Transfer Switch (1600 AMP) Deterioration by Demolit 1 EACH Useful Life 4 P4 Cap Renewal UnNoUn 78,857.45$ 86,743.19$ Granby Middle S M Building Wide Electrical, Technology, & Security D50 D5010 D5010-10 D5010-10-04C Correct Distribution Wiring Deterioration by Demolition & Replacement 73,406 BLDG SF Useful Life 3 P3 Cap Renewal UnNoUn 1,637,680.52$ 1,801,448.57$ Granby Middle S M 1st Floor Electrical, Technology, & Security D50 D5010 D5010-12 D5010-12-05C Correct Panelboard (225 AMP) Deterioration by Demolition & Replacem 4 EACH Useful Life 1 P1 Wing B Cap Renewal UnNoUn 67,380.13$ 74,118.14$ Granby Middle S M Electrical Room Electrical, Technology, & Security D50 D5010 D5010-12 D5010-12-05C Correct Panelboard (225 AMP) Deterioration by Demolition & Replacem 4 EACH Useful Life 1 P1 Cap Renewal UnNoUn 67,380.13$ 74,118.14$ Granby Middle S M Penthouse Electrical, Technology, & Security D50 D5010 D5010-12 D5010-12-05C Correct Panelboard (225 AMP) Deterioration by Demolition & Replacem 3 EACH Useful Life 2 P2 Cap Renewal UnNoUn 50,535.09$ 55,588.60$ Granby Middle S M 1st Floor Electrical, Technology, & Security D50 D5010 D5010-12 D5010-12-05C Correct Panelboard (225 AMP) Deterioration by Demolition & Replacem 2 EACH Useful Life 1 P1 Elect Closet Wing A Cap Renewal UnNoUn 33,690.06$ 37,059.07$ Granby Middle S M 2nd Floor Electrical, Technology, & Security D50 D5010 D5010-12 D5010-12-05C Correct Panelboard (225 AMP) Deterioration by Demolition & Replacem 2 EACH Useful Life 1 P1 Wing B Cap Renewal UnNoUn 33,690.06$ 37,059.07$ Granby Middle S M 2nd Floor Electrical, Technology, & Security D50 D5010 D5010-12 D5010-12-05C Correct Panelboard (225 AMP) Deterioration by Demolition & Replacem 2 EACH Useful Life 1 P1 Wing A Cap Renewal UnNoUn 33,690.06$ 37,059.07$ Granby Middle S M Kitchen Electrical, Technology, & Security D50 D5010 D5010-12 D5010-12-05C Correct Panelboard (225 AMP) Deterioration by Demolition & Replacem 2 EACH Useful Life 1 P1 Cap Renewal UnNoUn 33,690.06$ 37,059.07$ Granby Middle S M Penthouse Electrical, Technology, & Security D50 D5010 D5010-14 D5010-14-01C Correct Motor Starter Deterioration by Demolition & Replacement 8 EACH Useful Life 2 P2 Cap Renewal UnNoUn 115,718.82$ 127,290.70$ Granby Middle S M Penthouse Electrical, Technology, & Security D50 D5010 D5010-14 D5010-14-01C Correct Motor Starter Deterioration by Demolition & Replacement 6 EACH Useful Life 2 P2 Cap Renewal UnNoUn 86,789.11$ 95,468.02$ Granby Middle S M Electrical Room Electrical, Technology, & Security D50 D5010 D5010-14 D5010-14-01C Correct Motor Starter Deterioration by Demolition & Replacement 3 EACH Useful Life 1 P1 Cap Renewal UnNoUn 43,394.56$ 47,734.01$ Granby Middle S M Kitchen Electrical, Technology, & Security D50 D5010 D5010-14 D5010-14-01C Correct Motor Starter Deterioration by Demolition & Replacement 2 EACH Useful Life 1 P1 Cap Renewal UnNoUn 28,929.70$ 31,822.67$ Granby Middle S M 1st Floor Electrical, Technology, & Security D50 D5010 D5010-14 D5010-14-01C Correct Motor Starter Deterioration by Demolition & Replacement 2 EACH Useful Life 1 P1 Elect Closet Wing A Cap Renewal UnNoUn 28,929.70$ 31,822.67$ Granby Middle S M Storage Room Electrical, Technology, & Security D50 D5010 D5010-14 D5010-14-01C Correct Motor Starter Deterioration by Demolition & Replacement 2 EACH Useful Life 2 P2 First Floor Wing C Cap Renewal UnNoUn 28,929.70$ 31,822.67$ Granby Middle S M Electrical Room Electrical, Technology, & Security D50 D5010 D5010-15 D5010-15-01C Correct Disconnect Switch Deterioration by Demolition & Replacement 1 EACH Useful Life 1 P1 Cap Renewal UnNoUn 2,521.44$ 2,773.59$ Granby Middle S M Building Wide Electrical, Technology, & Security D50 D5020 D5020-10 D5020-10-01C Correct Building Wide General Lighting Inefficient by Demolition & Repla 73,406 BLDG SF Useful Life 3 P3 Cap Renewal UnNoUn 1,637,452.96$ 1,801,198.26$ Granby Middle S M Building Exterior Electrical, Technology, & Security D50 D5020 D5020-16 D5020-16-01C Correct Exterior Building Recessed Lighting Deterioration by Demolition 7 EACH Useful Life 2 P2 Cap Renewal UnNoUn 11,327.09$ 12,459.80$ Granby Middle S M Building Exterior Electrical, Technology, & Security D50 D5020 D5020-16 D5020-16-02C Correct Exterior Building Wall Mounted Lighting Deterioration by Demo 26 EACH Useful Life 2 P2 Cap Renewal UnNoUn 38,769.71$ 42,646.68$ Granby Middle S M Storage Room Electrical, Technology, & Security D50 D5020 D5020-20 D5020-20-02C Correct Commercial Dimming System (1K - 5K SF) Deterioration by Demo 3,000 SQFT Useful Life 1 P1 Chair Storage rm next to kit Cap Renewal UnNoUn 31,844.70$ 35,029.17$ Granby Middle S M 2nd Floor Electrical, Technology, & Security D50 D5021 D5021-01 D5021-01-06C Correct Receptacles (GFCI) Required by Install New 32 EACH Useful Life 1 P1 Counter top outlets near sin Cap Renewal UnNoUn 40,102.80$ 44,113.08$ Granby Middle S M Building Wide Electrical, Technology, & Security D50 D5021 D5021-03 D5021-03-03C Correct Branch Wiring Deterioration by Demolition & Replacement (BLD 73,406 BLDG SF Useful Life 3 P3 Cap Renewal UnNoUn 515,310.12$ 566,841.13$ Granby Middle S M Building Wide Electrical, Technology, & Security D50 D5031 S D5031-05 D5031-05-01C Correct Building Wide Security System Deterioration by Demolition & Re 73,406 BLDG SF Useful Life Life Safety 2 P2 Cap Renewal UnNoUn 183,294.78$ 201,624.26$ Granby Middle S M Building Wide Electrical, Technology, & Security D50 D5031 S D5031-08 D5031-08-01C Correct Building Wide Video Surveillance System Deterioration by Demo 73,406 BLDG SF Useful Life Life Safety 2 P2 Cap Renewal UnNoUn 318,538.00$ 350,391.80$ Granby Middle S M Building Wide Electrical, Technology, & Security D50 D5032 C D5032-01 D5032-01-02C Correct Master Clock System Deterioration by Demolition & Replacemen 73,406 BLDG SF Useful Life 4 P4 Cap Renewal UnNoUn 249,940.09$ 274,934.10$ Granby Middle S M Building Wide Electrical, Technology, & Security D50 D5035 T D5035-04 D5035-04-01C Correct Building-Wide Telephone System Deterioration by Demolition & 73,406 BLDG SF Useful Life 4 P4 Cap Renewal UnNoUn 413,165.67$ 454,482.24$ Granby Middle S M Penthouse Electrical, Technology, & Security D50 D5090 O D5090-04 D5090-04-05C Correct Uninterruptable Power Supply System (10 KVA) Deterioration by 1 EACH Useful Life Life Safety 1 P1 Exit/ Em Light battery back Cap Renewal UnNoUn 47,269.66$ 51,996.63$ Granby Middle S M 1st Floor Electrical, Technology, & Security D50 D5090 O D5090-05 D5090-05-01C Correct Lighting Timeclock Deterioration by Demolish & Replacement 1 EACH Useful Life 1 P1 Elect Closet Wing A Cap Renewal UnNoUn 2,358.40$ 2,594.24$ Granby Middle S M Building Wide Architectural Interiors & Finishes E20 E2010 F E2010-01 WE2010-01-01C Correct Wardrobe Deterioration by Demolition & Replacement 17 EACH Useful Life 2 P2 A Wing First Floor - Rms S7 Cap Renewal UnNoUn 29,662.15$ 32,628.36$ Granby Middle S M Building Wide Architectural Interiors & Finishes E20 E2010 F E2010-04 C E2010-04-01C Correct Wall Cabinet Deterioration by Demolition & Replacement 156 LNFT Useful Life 2 P2 (40 lf) A Wing - First Floor - Cap Renewal UnNoUn 104,960.59$ 115,456.65$ Granby Middle S M Building Wide Architectural Interiors & Finishes E20 E2010 F E2010-04 C E2010-04-04C Correct Base Cabinet with Laminate Counter Deterioration by Demolitio 1,273 LNFT Useful Life 2 P2 (60 lf) A Wing - First Floor - Cap Renewal UnNoUn 1,460,022.80$ 1,606,025.07$ Granby Middle S M Building Wide Architectural Interiors & Finishes E20 E2010 F E2010-04 C E2010-04-11C Correct Laminate Countertop Only Deterioration by Demolition & Replac 65 SQFT Useful Life 2 P2 A wing second floor. Cap Renewal UnNoUn 4,768.63$ 5,245.49$ Granby Middle S M Building Wide Architectural Interiors & Finishes E20 E2010 F E2010-05 E2010-05-01C Correct Laboratory Casework Deterioration by Demolition & Replaceme 222 LNFT Useful Life 3 P3 Lower cabinet with epoxy c Cap Renewal UnNoUn 546,261.70$ 600,887.87$ Granby Middle S M Building Wide Architectural Interiors & Finishes E20 E2013 F E2013-03 E2013-03-07C Correct Indoor Motorized Telescopic Bleacher Deterioration by Demoliti 450 SEAT Useful Life 2 P2 Cap Renewal UnNoUn 381,683.16$ 419,851.48$ Granby Middle S M Parking Lot Site Improvements G20 G2020 G2020-01 G2020-01-02C Correct Bituminous Parking Lot Deterioration by Patch & Apply Sealcoat 2,778 SQYD Damaged / Ino 2 P2 North parking lot Cap Renewal UnNoUn 3,541,191.61$ 3,895,310.77$ Granby Middle S M Parking Lot Site Improvements G20 G2020 G2020-01 G2020-01-02C Correct Bituminous Parking Lot Deterioration by Patch & Apply Sealcoat 600 SQYD Damaged / Ino 1 P1 Drive lane @ south elevatio Cap Renewal UnNoUn 764,836.20$ 841,319.82$ Granby Middle S M Parking Lot Site Improvements G20 G2020 G2020-01 G2020-01-02C Correct Bituminous Parking Lot Deterioration by Patch & Apply Sealcoat 223 SQYD Damaged / Ino 2 P2 Drive lane @ loading dock Cap Renewal UnNoUn 284,264.12$ 312,690.53$ Granby Middle S M Parking Lot Site Improvements G20 G2030 G2030-01 G2030-01-03C Correct Bituminous Sidewalk Deterioration by Patch & Install Sealcoat 889 SQYD Damaged / Ino 2 P2 Walkway around building p Cap Renewal UnNoUn 11,335.11$ 12,468.62$ Granby Middle S M Building Property Fire Alarm & Protection G30 G3010 W G3010-03 G3010-03-03C Correct Site Fire Protection Water Service Piping (6" Pipe) Required by In 365 LNFT Best Practice / Life Safety 2 P2 Item 4 of 4 required to prov Cap Imprv UnNoUn 67,374.44$ 74,111.88$ Granby Middle S M Building Property Fire Alarm & Protection H10 H1010 H1010-35 H1010-35-01C Correct Pump House Required by Add New 180 SQFT Best Practice / Life Safety 2 P2 Item 2 of 4 required to prov Cap Imprv UnNoUn 20,857.50$ 22,943.25$ Granby Middle S M Kitchen Architectural Interiors & Finishes Z10 Z1040 D Z1040-01 A Z1040-01-01C Correct Investigation Consultant Services Required by Contracting Appro 6 LPSM Useful Life 1 P1 Allowance to replace (2) ex Cap Renewal UnNoUn 94,500.00$ 103,950.00$
Page 34
2026 Granby MS Facility Condition Assessment ASSESSEMENT STANDARDS & DEFINITIONS March 31, 2026 1 | P a g e Project Scope of Work Summary The team will evaluate equipment and assess major building and site-related systems for the purpose of identifying capital renewal and capital improvement needs. The scope of work includes the identification of stewardship-focused corrective actions that address significant repairs, restoration, or replacement over the next 10 years for the following items: Building Envelope / Substructure Roofing Systems Exterior Walls, Windows, Doors Interior Construction & Finishes Fixed Furnishings & Casework HVAC Systems & Equipment Electrical Power / Distribution Lighting Systems Information / Communication Tech Plumbing Systems Fire Protection / Life Safety Security Systems Elevators / Lifts / Ramps Hazardous Abatement Exterior Building / Site Lighting Pedestrian Access / Sidewalks Vehicular Access / Parking Lots Genl Mech / Elec / Plumb Utilities Our inspection is characterized as non-intrusive, non-destructive based on the team members’ reasonable access to observe visible building components and equipment. Building Classification System The UNIFORMAT classification system is one of the primary tools for insuring consistency of assessment information between buildings and projects. Listed below is the categorization by which “corrective actions” are applied to each facility by building system and sub-system per the UNIFORMAT. A10 – Foundations A20 – Basement Construction B10 – Superstructure B20 – Exterior Enclosure B30 – Roofing C10 – Interior Construction C20 – Stairs & Ramps C30 – Interior Finishes D10 – Conveying D20 – Plumbing D30 – HVAC D40 – Fire Protection D50 – Electrical E10 – Equipment E20 – Furnishings F10 – Special Construction F20 – Selective Demolition G10 – Site Preparation G20 – Site Improvements G30 – Site Civil Mech Utilities G40 – Site Electrical Utilities G90 – Other Site Construction H10 – Space Requirements Z10 – General Requirements
Page 35
2026 Granby MS Facility Condition Assessment ASSESSEMENT STANDARDS & DEFINITIONS March 31, 2026 2 | P a g e Prioritization Classifications Recommended corrective actions will be assigned a priority which, in the opinion of the assessor, classifies the urgency of the required replacement or repair over a 10-year period. Note that corrective actions are applied based on our knowledge of complex building systems, industry standards, owner insight, available documentation, and a visual inspection to determine the perceived condition of building systems or equipment, not simply installation dates. Corrective actions with a Priority 2 – 4 applied are subjective in nature based on the existing condition, current environment, standard usage, and maintenance performed by the owner. Priority 1 Work should be performed immediately. (CY’2027) Priority 2 Work should be performed within 3 years. (CY’2028 – 2030) Priority 3 Work should be performed within 5 years. (CY’2031 – 2032) Priority 4 Work should be performed within 10 years. (CY’2033-2037) Correction Type Category Recommended corrective actions will be assigned a “correction category” criterion which identifies the “type” of expenditure required to address the recorded issue. This rating will provide another option to analyze data and assist the decision-making process in the development of capital improvement plans. Capital Renewal o Corrective actions that address maintenance repairs, restoration, or replacement of an existing building system or component that have not yet been expended. o Work that potentially should have been performed but was delayed due to funding issues, changing priorities, access limitations, or the capacity to perform the work. Capital Improvement o Corrective actions that address a non-existent or non-compliant building system or component for general code compliance or consistent with current technology.
Page 36
2026 Granby MS Facility Condition Assessment ASSESSEMENT STANDARDS & DEFINITIONS March 31, 2026 3 | P a g e Justifications for Corrective Actions Recommended corrective actions will be assigned a “justification” criterion that helps identify the “why” or perceived driver of the improvement. A minimum of (1) one justification is required to be assigned with the most serious / significant justification issued first, with the potential application of (2) two justifications when appropriate. Proposed justifications include: Best Practice / Standard Damaged / Inoperable Environmental Improvement* Functionality Life Safety** Useful Life *Environmental Improvement is applicable to hazardous materials or select new mechanical. **Life Safety initiates a phone call only when reporting a situation of potential imminent danger. Unit of Measures (UOM) Each corrective action in the Capital Renewal & Improvement Report have an assigned unit of measure. Listed below are typical and/or potential UOM’s applied in this project: ACRE – Acre BLDG SF – Building Square Feet CUFT – Cubic Feet CUYD – Cubic Yards EACH – Each FLR – Floor HGHT – Height (Escalators) LNFT – Linear Feet LPSM – Lump sum RISR – Riser SEAT – Seat SQFT – Square Feet SQYD – Square Yards TONS – Tons Campus / Property This project will include the following Campus / Property: Granby Public Schools Building Types For report and analysis purposes, this project will include the following building type: Middle School
Page 37
2026 Granby MS Facility Condition Assessment ASSESSEMENT STANDARDS & DEFINITIONS March 31, 2026 4 | P a g e Project Team Disciplines Assessment data will be collected by the following discipline specialists: ARCH Architectural (Interior Construction, Building Envelope, Site) ELEC Electrical / Security / Communications MEPL Mechanical / Plumbing Cost Estimate Development & Approach StudioJAED’s CT2000© data collection and reporting tool contains a master database of recommended corrective actions and associated unit cost estimates based on a pre-assigned unit of measure. In accordance with our quality assurance practices, each estimate is developed by our Certified Professional Estimators utilizing the RSMeans “CostWorks” application. Base trade costs are typically adjusted to incorporate several other construction and soft cost factors (i.e., contractor costs, owner contingency, permits, fees, etc.) as per client preferences. Note that estimates are developed from a conservative perspective and are intended to support the planning process for capital improvement needs. The approved cost model defined for this project will be applied to each recommended corrective action. This provides the owner the greatest degree of flexibility to implement a single item or a grouping of items based on current circumstances. If the owner chooses to implement multiple projects at the same building and/or similar work across multiple buildings, efficiencies are likely that will result in an overall savings. Provided below is the proposed BASIC cost model approach including preferred construction delivery method and allowance percentages.
Page 38
2026 Granby MS Facility Condition Assessment ASSESSEMENT STANDARDS & DEFINITIONS March 31, 2026 P a g e 5 | 8 Base Trade Cost RSMeans is the leading source of current construction cost estimating data used in the industry. StudioJAED utilizes the RSMeans database to generate a “Base Trade Cost” estimate per unique corrective action which includes allowances for materials, labor, transportation, and storage by task. All unit costs are adjusted to the appropriate city cost index to account for regional factors. Estimated Construction “Hard” Cost The Construction Cost includes construction delivery overhead, profit, general conditions, insurance, bonds, material, and labor to perform the scope of work. Allowances for ancillary trade work required to complete the scope of work are included for a complete project. Listed below are the conditions and/or assumptions used to develop the construction “Hard” cost estimates which by definition exclude owner soft costs such as project management, design fees, owner contingency, permit fees, etc.: Prevailing wage labor rates on straight time. No consideration of factors related to implementation (i.e., occupied, phased, etc.) No escalation As a reminder, escalation is not included in any cost model as it should be calculated / added to the “Total Cost” based on an anticipated date of construction. Base Trade Cost $1,000.00 General Construction Delivery Method Markup 26.00% $260.00 Field General Conditions (10%) Insurance (2%) P&P Bond (1.5%) Permits & Fee Allowance (2.5%) Overhead & Profit (10%) Estimated Construction Cost $1,260.00 Soft Cost Allowance A/E Design thru Construction Administration Fee Allowance 10.0% $126.00 Unforseen Construction Contingency Allowance 10.0% $126.00 Owner Costs 0.0% $0.00 Project Management 5.0% $63.00 Estimated Total Cost $1,575.00 Based on current 2026 RSMeans Trade Cost (Adjusted based on project location appropriate City Cost Index)
Page 39
2026 Granby MS Facility Condition Assessment ASSESSEMENT STANDARDS & DEFINITIONS March 31, 2026 P a g e 6 | 8 Soft Cost Allowance The cost model approach provides the ability to uniformly adjust the estimated construction cost to account for typical owner fees and allowances, as shown, as well as unique cost factors. Estimated Total Cost The Estimated Total Cost is the cumulative cost anticipated to complete each unique corrective action based on current regionalized trade costs, typical contractor costs, averaged owner cost allowances, and the potential consideration of unique factors that impact the cost of construction. System Cost Analysis & Adjustment StudioJAED has conducted several work sessions to evaluate current market conditions, recent owner bid results, and other factors that appear to have a long-term impact on typical material, equipment, and labor construction costs. The team mutually determined that the best overall approach to forecasting construction costs is to apply a percentage factor by select building systems. Based on recent project data across multiple sources, the recommended percent increase to be applied for all corrective actions applied is as follows: Foundations (5%) Basement Construction (5%) Superstructure (12%) Exterior Enclosure (5%) Roofing (10%) Plumbing (9%) HVAC (18%) Fire Protection (18%) Electrical (16%) Site Preparation (5%) Site Improvements (5%) For planning purposes, all estimated assessment costs are expressed within a “range” with a proposed low range value (0%) and a high range value (10%). This provides an adjustment to account for project complexity factors, anticipated and/or unforeseen, that may impact the implementation and/or execution of improvements. Provided below is the proposed ENHANCED cost model approach which includes the mutually agreed upon system specific adjustments and range factors outlined above as well as a sample calculation table.
Page 40
2026 Granby MS Facility Condition Assessment ASSESSEMENT STANDARDS & DEFINITIONS March 31, 2026 P a g e 7 | 8 Enhanced Cost Model Approach Base Trade Cost $1,000.00 General Construction Delivery Method Markup 26.0% $260.00 Field General Conditions (10%) Insurance (2%) P&P Bond (1.5%) Permits & Fee Allowance (2.5%) Overhead & Profit (10%) Estimated Construction Cost $1,260.00 % Factor by Select Building Systems (Example: Roofing) 10.0% $126.00 Foundations 5% HVAC 18% Basement Construction 5% Fire Protection 18% Superstructure 12% Electrical 16% Exterior Enclosure 5% Site Preparation 5% Roofing 10% Site Improvements 5% Plumbing 9% Adjusted System Cost $1,386.00 Soft Cost Allowance A/E Design thru Construction Administration Fee Allowance 10.0% $138.60 Unforseen Construction Contingency Allowance 10.0% $138.60 Owner Costs 0.0% $0.00 Project Management 5.0% $69.30 Estimated Assessment Cost (Low Range) $1,732.50 Complexity Factor Allowance, Anticipated or Unforseen 10.0% $173.25 Estimated Assessment Cost (High Range) $1,905.75 Based on current 2026 RS Means Trade Cost (Adjusted based on project location appropriate City Cost Index)
Page 41
2026 Granby MS Facility Condition Assessment ASSESSEMENT STANDARDS & DEFINITIONS March 31, 2026 P a g e 8 | 8 Construction Cost Analysis & Adjustments by Building System Sample Calculation Table 25% 0% 10% System Name Estimated Const Cost System % Factor Adjusted System Cost Adjusted System w/ Soft Cost Estimated Assmt Cost Low Range Estimated Assmt Cost High Range A10 Foundations 1,260.00$ 5% 1,323.00$ 1,653.75$ 1,653.75$ 1,819.13$ A20 Basement Construction 1,260.00$ 5% 1,323.00$ 1,653.75$ 1,653.75$ 1,819.13$ B10 Superstructure 1,260.00$ 12% 1,411.20$ 1,764.00$ 1,764.00$ 1,940.40$ B20 Exterior Enclosure 1,260.00$ 5% 1,323.00$ 1,653.75$ 1,653.75$ 1,819.13$ B30 Roofing 1,260.00$ 10% 1,386.00$ 1,732.50$ 1,732.50$ 1,905.75$ C10 Interior Construction 1,260.00$ 0% 1,260.00$ 1,575.00$ 1,575.00$ 1,732.50$ C20 Stairs & Ramps 1,260.00$ 0% 1,260.00$ 1,575.00$ 1,575.00$ 1,732.50$ C30 Interior Finishes 1,260.00$ 0% 1,260.00$ 1,575.00$ 1,575.00$ 1,732.50$ D10 Conveying 1,260.00$ 0% 1,260.00$ 1,575.00$ 1,575.00$ 1,732.50$ D20 Plumbing 1,260.00$ 9% 1,373.40$ 1,716.75$ 1,716.75$ 1,888.43$ D30 HVAC 1,260.00$ 18% 1,486.80$ 1,858.50$ 1,858.50$ 2,044.35$ D40 Fire Protection 1,260.00$ 18% 1,486.80$ 1,858.50$ 1,858.50$ 2,044.35$ D50 Electrical 1,260.00$ 16% 1,461.60$ 1,827.00$ 1,827.00$ 2,009.70$ E10 Equipment 1,260.00$ 0% 1,260.00$ 1,575.00$ 1,575.00$ 1,732.50$ E20 Furnishings 1,260.00$ 0% 1,260.00$ 1,575.00$ 1,575.00$ 1,732.50$ F10 Special Construction 1,260.00$ 0% 1,260.00$ 1,575.00$ 1,575.00$ 1,732.50$ F20 Selective Demolition 1,260.00$ 0% 1,260.00$ 1,575.00$ 1,575.00$ 1,732.50$ G10 Site Preparation 1,260.00$ 5% 1,323.00$ 1,653.75$ 1,653.75$ 1,819.13$ G20 Site Improvements 1,260.00$ 5% 1,323.00$ 1,653.75$ 1,653.75$ 1,819.13$ G30 Site Civil Mech Utilities 1,260.00$ 0% 1,260.00$ 1,575.00$ 1,575.00$ 1,732.50$ G40 Site Electrical Utilities 1,260.00$ 0% 1,260.00$ 1,575.00$ 1,575.00$ 1,732.50$ G90 Other Site Construction 1,260.00$ 0% 1,260.00$ 1,575.00$ 1,575.00$ 1,732.50$ H10 Space Requirements 1,260.00$ 0% 1,260.00$ 1,575.00$ 1,575.00$ 1,732.50$ Z10 General Requirements 1,260.00$ 0% 1,260.00$ 1,575.00$ 1,575.00$ 1,732.50$
Page 42
Granby, Connecticut BOARD OF EDUCATION Monica Logan, Chair Heather Lombardo, Vice Chair Liz Barlow, Secretary Andrew Billig Donna Nolan David Peling, Ed.D. Ann Woods ADMINISTRATION Cheri P. Burke, Superintendent of Schools Jennifer M. Parsons, Assistant Superintendent Jennifer Brown, Director of Human Resources Kathryn Weingartner, Director of Pupil Services Nicole Stevenson, Director of Finance & Operations Christopher DeGray, Director of Facilities Heather Tanis, Principal, Granby Memorial Middle School EDUCATIONAL SPECIFICATIONS for Granby Memorial Middle School DRAFT – April 2026 Approved by the Granby Board of Education on _________
Page 43
TABLE OF CONTENTS I. INTRODUCTION ......................................................................................3 II. GRANBY CORE DOCUMENTS ..............................................................3 III. PROJECT RATIONALE ............................................................................4 IV. THE PROJECT ...........................................................................................4 V. ENROLLMENT AND CAPACITY DATA ...............................................4 VI. OVERVIEW OF PROGRAMS ..................................................................4 VII. PROGRAM SPECIFICATIONS (Detailed Description) ...........................7 On-Team Programs ............................................................................................................7 Unified Arts Programs........................................................................................................11 Elective Programs...............................................................................................................15 General Education Support Programs ................................................................................18 Special Education Programs ...............................................................................................20 Administration & Support Programs ..................................................................................24 VIII. COMMUNITY USE ...................................................................................30 IX. ENVIRONMENT - SYSTEMS - EQUIPMENT .......................................30 X. SITE DEVELOPMENT..............................................................................34 SPACE SUMMARY ..................................................................................35
Page 44
April 2026 Granby Memorial Middle School, Granby, CT Page 3 I. INTRODUCTION The Granby Public Schools is committed to consistently maintaining our facilities and planning for the future of our buildings as 21st century learning environments. To initiate planning for a “renovated as new” Granby Memorial Middle School, Granby Board of Education engaged the services of Colliers Project Leaders and Daniel Hansen, educational consultant, to assist with the development of Educational Specifications. The following individuals participated in the initial program meetings to provide input for these educational specifications: Elizabeth Asal, School Psychologist Jeannie Bryanton, Teacher - Art Tim Cunningham, Director of School Counseling Yuri Dominguez, Technology Support Specialist Laila Falkenberg, Teacher – Math Intervention Jess Foskitt, Teacher - Music Dean Godin, Teacher – Physical Education/Wellness James Janski, Teacher – Technology Education John Lambert, Director of Technology Frank Melanson, Technology Operations Manager Caryn Neff, School Counselor Jodi Okenquist, Teacher – Social Studies Jennifer Parsons, Assistant Superintendent Megan Rheiner, School Counselor Ruth Rivera, Teacher – Music Leigh Ann Ryan, Library Media Specialist Alex Schwartz, Assistant Principal Tracy Smith, Department Chair – Special Education Heather Tanis, Principal Michelle Tardif, Teacher – Literacy Specialist Kate Wardle, Teacher – Family & Consumer Science Kate Weingartner, Director of Pupil Services Peter Wik, Teacher – Science II. GRANBY CORE DOCUMENTS GRANBY PUBLIC SCHOOLS Vision of a Graduate Resourceful Learners • Ask questions and identify problems or challenges • Identify strategies and methods for personal success • Explore and connect areas of interest • Set goals and persist in achieving these goals • Gather and evaluate a variety of sources and perspectives • Synthesize information and create solutions • Solve complex problems by applying approaches from multiple disciplines Effective Communicators • Listen closely and respectfully participate in discourse • Value diverse voices and viewpoints • Prepare a message for an identified purpose and audience • Express ideas clearly in a variety of ways • Support arguments with evidence • Adapt and adjust thinking based on feedback and new learning • Use tools and technology flexibly and strategically Positive Contributors • Develop meaningful connections with others • Collaborate for a common goal • Exhibit compassion and empathy • Make healthy and responsible decisions • Use personal talents and knowledge to contribute to society • Demonstrate civic responsibility • Understand that actions have impact on the local community, the country and our global society Adopted by the Granby Board of Education September 1, 2021
Page 45
April 2026
Granby Memorial Middle School, Granby, CT Page 4
III. PROJECT RATIONALE
This section needs to be completed once the project moves forward. This section should capture the districts long-
range facility goals; feasibility studies completed; projects already completed, etc.
This project seeks to provide a school building that:
• Creates learning environments designed for current instructional strategies as captured in Granby’s Core
Documents;
• Benefits from needed technology upgrades;
• Complies with current building and fire codes;
• Incorporates contemporary design for school safety;
• Utilizes modern, efficient heating and cooling systems; and
• Provides accessibility to all by meeting the requirements of the Americans
with Disabilities Act.
IV. THE PROJECT
Objective: To ensure all Granby children are able to attend a school that is safe, modern, compliant with current
building codes and able to support their educational program.
The following project specifications for the “renovated as new” Granby Memorial Middle School were developed
using data from the updated population study conducted in January 2025. Granby Public Schools 10-Year Enrollment
Projections Update, MP Planning Group, December 2025.
• School: Granby Memorial Middle School (6-8)
• Project Type: Renovate as New
o Total Program Area: 58,825 square feet for Grade 6-8 programs
• Design Enrollment: 401 students (8-year max projection)
V. ENROLLMENT AND CAPACITY DATA
The Granby Memorial Middle School enrollment as of October 1, 2025 was 398 students in grades 6-8. The eight-
year maximum enrollment projection for the middle school is 401.
Source: Granby Public Schools 10-Year Enrollment Projections, December 2025, MP Planning Group
VI. OVERVIEW OF PROGRAMS
MIDDLE SCHOOL COURSE OF STUDIES
Sixth Grade
On Team Courses Unified Arts Courses Electives
English Language Arts (Full
Year)
Mathematics 6/Accelerated
(Full Year)
Visual Arts 6 (Quarterly)
Explorations in Technology (Quarterly)
Family Consumer Sciences (FCS): Eat Smart,
Live Smart (Quarterly)
Band (Full Year)
Chorus (Full
Year)
Orchestra (Full
Year) Page 46
April 2026
Granby Memorial Middle School, Granby, CT Page 5
Integrated Science 6 (Full
Year)
Global Studies 6 (Full Year)
World Language (Every Other
Day)
• French 6
• Spanish 6
GMMS SUCCESS (Every
Other Day)
Study Skills (Full Year)
Digital Media (Quarterly)
Music Appreciation (Full Year)
Wellness 6 (Full Year)
Seventh Grade
On Team Courses Unified Arts Courses Electives
English Language Arts (Full Year)
Mathematics (Full Year)
• Math 7
• Advanced Math
Integrated Science 7 (Full Year)
Global Studies 7 (Full Year)
World Language (Full Year)
• French I
• Spanish I
Study Skills (Full Year)
Visual Arts 7(Quarterly)
Production Systems &
Enterprise (Quarterly)
FCS - Building Your Life Skills (Quarterly)
Innovative Technologies (Quarterly)
Music Appreciation 7 (Full Year)
Wellness 7 (Full Year)
Band (Full Year)
Chorus (Full Year)
Orchestra (Full Year)
Eighth Grade
On Team Courses Unified Arts Courses Electives
English Language Arts (Full Year)
Mathematics (Full Year)
• Pre-Algebra
• Algebra
Integrated Science 8 (Full Year)
US History 8 (Full Year)
World Language (Full Year)
• French II
• Spanish II
• Mandarin Chinese II
Visual Arts 8 (Quarterly)
Engineering and Research &
Development (Quarterly)
FCS - Planning Your Future (Quarterly)
Computer Science (Quarterly)
Music Appreciation 8 (Full Year)
Wellness 8 (Full Year)
Band (Full Year)
Chorus (Full Year)
Page 47
April 2026 Granby Memorial Middle School, Granby, CT Page 6 Study Skills (Full Year) The classroom needs of all Middle School children will require flexibility of space, portability of furniture and acoustical treatment of environment. Consistent with Granby’s Educational Goals, these collaborative learning environments will allow for students to become Resourceful Learners, Effective Communicators, and Positive Contributors. This will be accommodated by providing space for group instruction and movement that will range from total class involvement to three or four separate groups doing different activities at the same time. Space should also be provided for students to read, write, research, and study for either individual or small group projects. The learning environment must also accommodate space for multiple adults (specialists and paraeducators) who work with students within the general classroom environment. All instructional classrooms require storage space for items such as classroom libraries, textbooks, reference materials, supplemental books, supplies and manipulatives, science equipment, and computers. Equally important is wall space (vertical space/white boards) for collaborative groups to show their work and for posting anchor charts and other instructional reference materials for students to access on a daily basis. Furthermore, the teaming structure at the Middle School consists of four interdisciplinary teams. A platform within the cafeteria or gymnasium will serve as a stage area for school assemblies, performances and other events and will be accessible from the main corridor. The platform will be code compliant with ramp access. Included in the design will be a high-quality built-in sound system, stage draperies and main curtains, as well as adjustable stage and general lighting. Additional instructional space is necessary to provide support for general education students, as prescribed in the Scientific Researched Based Intervention (SRBI) requirements of the Connecticut State Department of Education. General Education Intervention/Support Services is comprised of Reading and Mathematics intervention and Multi- Language Learner (MLL) support. Each of these rooms will be located within the academic area of the building. These rooms will be utilized for individual and small group instruction. Significant space is also required for the Guidance Department including office space, instructional space and file storage. The Middle School students will have access to a multi-purpose field with artificial turf, a track and a baseball field. The athletic fields and playground areas shall include: controlled perimeter fencing; lockable gates for supervised access; and the fence design shall maintain visibility while supporting security. SPECIAL EDUCATION Granby Public Schools invests significantly in its special education programming to provide inclusive, high quality learning opportunities and ensure students are served within their school community whenever possible. Special Education programs at Granby Memorial Middle School include: Special Education Resource program; the Life Skills program; Occupational/Physical Therapy (OT/PT) Services; and Related Services (Psychologist, Speech/Language/Hearing, Social Worker). Program spaces for special education/related service teachers should be able to meet the needs for small group instruction. They will need to be of sufficient size to accommodate children who require specialized equipment. Rooms will be used for individual and small group instruction, individual testing, confidential meetings with parents and/or students, counseling, and staff conferences. SUPPORT SERVICES MEDIA CENTER The Library Media Center of the Middle school is a multi-purpose room preferably located as a central “hub” of the school. These spaces should be bright, colorful, attractive, warm and inviting. It is important that the media center be designed with the student’s safety and access in mind. There should be freestanding low, double-faced shelving allowing a staff member to see the entire area. The area must be spacious enough to house an appropriate print and media collection. The media center should include a mix of large group instructional space, small group collaboration areas, independent work zones, and flexible project-based learning areas. Furniture should be mobile and easily reconfigurable to support whole-class instruction, team teaching, small-group collaboration, and individual learning. The space should support research, media creation, design thinking, and student presentation. Dedicated areas may include a project or maker space, informal seating for collaboration, and spaces for inquiry-based learning, and interdisciplinary work.
Page 48
April 2026 Granby Memorial Middle School, Granby, CT Page 7 TECHNOLOGY A contemporary Middle school must be able to support varied uses of technology. In particular, the school’s infrastructure should reflect the latest in wiring and cabling, which would support current technology applications as well as the capacity to support future requirements. Computers should support the full range of educational and operational functions in the school. Wiring for all classrooms will include multiple network drops and multiple electrical outlets. The entire facility will have wireless connectivity to support the implementation of one-to-one mobile devices such as laptops, netbooks, and other Internet-ready devices. VII. MIDDLE SCHOOL PROGRAM SPECIFICATIONS (Detailed Description) Unless otherwise noted, the standard furnishings for every classroom noted below are expected to include the following: • Room darkening shades • Privacy film or internal window coverings for classroom door vision panels • Acoustical insulation for soundproofing • Air conditioning • ADA compliant building standards • Wireless/internet access to support at least 30 mobile devices • Multiple electrical outlets and distributed charging access • Sound Field System • Telephone • Intercom for communication with office GENERAL EDUCATION PROGRAMS ON-TEAM PROGRAMS ACADEMIC CORE CLASSROOM - ELA SPACE: 900 square feet NUMBER: Four (4) classrooms Sinks • Stainless steel sink with solid surface counter • In-room water bottle filling station • Soap and towel dispenser Classroom Storage • Built-in bookcases • Storage areas for anchor charts, large bins/kits • Classroom library storage • Counters under windows where appropriate Teacher Storage • Lockable teacher storage wardrobe for three (3) adults • One (1) lockable four-drawer filing cabinet Student Storage • Individual coat and personal storage for up to twenty-five students per classroom in lockers in hallway Lighting • Soft color, dimmable lighting Flooring • VCT/VCP TILE and area rugs Display • Magnetic whiteboards in addition to interactive projective system • Bulletin Boards
Page 49
April 2026 Granby Memorial Middle School, Granby, CT Page 8 ACADEMIC CORE CLASSROOM - ELA Student Furniture • Flexible tables/desks/standing desks and appropriate student seating for twenty- five (25) • Kidney shaped or U-shaped small group instruction table with chairs • Student chairs/stools along countertops for task work Teacher Furniture • Teacher desk/chair Other Furniture • Corner with soft seating Special Requests • Common small group space outside classroom desirable Classroom Technology • Classroom technology per Granby District Standards Computers • Teacher technology per Granby District Standards ACADEMIC CORE CLASSROOM - MATH SPACE: 900 square feet NUMBER: Four (4) classrooms Sinks • Stainless steel sink with solid surface counter • In-room water bottle filling station • Soap and towel dispenser Classroom Storage • Built-in bookcases • Storage areas for anchor charts, large bins/kits • Counters under windows where appropriate Teacher Storage • Lockable teacher storage wardrobe for three (3) adults • One (1) lockable four-drawer filing cabinet Student Storage • Individual coat and personal storage for up to twenty-five students per classroom in lockers in hallway Lighting • Soft color, dimmable lighting Flooring • VCT/VCP TILE and area rugs Display • Multiple magnetic whiteboards in addition to interactive projective system • Bulletin Boards Student Furniture • Flexible tables/desks/standing desks and appropriate student seating for twenty- five (25) • Kidney shaped or U-shaped small group instruction table with chairs • Student chairs/stools along countertops for task work Teacher Furniture • Teacher desk/chair Other Furniture • Corner with soft seating Special Requests • Common small group space outside classroom desirable Classroom Technology • Classroom technology per Granby District Standards Computers • Teacher technology per Granby District Standards ACADEMIC CORE CLASSROOM – INTEGRATED SCIENCE SPACE: 900 square feet NUMBER: Four (4) classrooms Sinks • Two (2) large/deep stainless-steel sinks with high spigots • In-room water bottle filling station • Soap and towel dispenser Classroom Storage • Built-in bookcases • Storage areas for anchor charts, large bins/kits • Classroom library storage • Work counters under windows and around room where possible
Page 50
April 2026 Granby Memorial Middle School, Granby, CT Page 9 ACADEMIC CORE CLASSROOM – INTEGRATED SCIENCE Teacher Storage • Lockable teacher storage wardrobe for three (3) adults • One (1) lockable four-drawer filing cabinet • Locked chemical closet Student Storage • Individual coat and personal storage for up to twenty-five students per classroom in lockers in hallway Lighting • Soft color, dimmable lighting Flooring • VCT/VCP TILE and area rugs Display • Magnetic whiteboards in addition to interactive projective system • Bulletin Boards Student Furniture • Lab tables and appropriate student seating for twenty-five (25) • Demonstration table with overhead projection • Student chairs/stools along countertops for task work Teacher Furniture • Teacher desk/chair Other Furniture • Corner with soft seating Special Requests • Greenhouse window for plants Classroom Technology • Classroom technology per Granby District Standards Computers • Teacher technology per Granby District Standards ACADEMIC CORE CLASSROOM – GLOBAL STUDIES/U.S. HISTORY SPACE: 900 square feet NUMBER: Four (4) classrooms Sinks • Stainless steel sink with solid surface counter • In-room water bottle filling station • Soap and towel dispenser Classroom Storage • Built-in bookcases • Storage areas for anchor charts, large bins/kits • Classroom library storage • Counters under windows where appropriate Teacher Storage • Lockable teacher storage wardrobe for three (3) adults • One (1) lockable four-drawer filing cabinet Student Storage • Individual coat and personal storage for up to twenty-five students per classroom in lockers in hallway Lighting • Soft color, dimmable lighting Flooring • VCT/VCP TILE and area rugs Display • Magnetic whiteboards accessible for student use • Bulletin Boards Student Furniture • Flexible tables/desks/standing desks and appropriate student seating for twenty- five (25) • Kidney shaped or U-shaped small group instruction table with chairs • Student chairs/stools along countertops for task work Teacher Furniture • Teacher desk/chair Other Furniture • Corner with soft seating Special Requests • Common small group space outside classroom desirable Classroom Technology • Classroom technology per Granby District Standards Computers • Teacher technology per Granby District Standards
Page 51
April 2026 Granby Memorial Middle School, Granby, CT Page 10 ACADEMIC CORE CLASSROOM – WORLD LANGUAGES SPACE: 900 square feet NUMBER: Three (3) classrooms Sinks • Stainless steel sink with solid surface counter • In-room water bottle filling station • Soap and towel dispenser Classroom Storage • Built-in bookcases • Storage areas for anchor charts, large bins/kits • Classroom library storage • Counters under windows where appropriate Teacher Storage • Lockable teacher storage wardrobe for one (1) adult • One (1) lockable four-drawer filing cabinet Lighting • Soft color, dimmable lighting Flooring • VCT/VCP TILE and area rugs Display • Magnetic whiteboards in addition to interactive projective system • Multiple Bulletin Boards Student Furniture • Flexible tables/desks/standing desks and appropriate student seating for twenty- five (25) • Kidney shaped or U-shaped small group instruction table with chairs • Student chairs/stools along countertops for task work Teacher Furniture • Teacher desk/chair Other Furniture • Corner with soft seating Classroom Technology • Classroom technology per Granby District Standards Computers • Teacher technology per Granby District Standards SUCCESS PROGRAM CLASSROOM (GRADE 6) SPACE: 900 square feet NUMBER: One (1) classroom Sinks • Stainless steel sink with solid surface counter • In-room water bottle filling station • Soap and towel dispenser Classroom Storage • Built-in bookcases • Storage areas for anchor charts, large bins/kits • Classroom library storage • Counters under windows where appropriate Teacher Storage • Lockable teacher storage wardrobe for one (1) adult • One (1) lockable four-drawer filing cabinet Lighting • Soft color, dimmable lighting Flooring • VCT/VCP TILE and area rugs Display • Magnetic whiteboards in addition to interactive projective system • Multiple Bulletin Boards Student Furniture • Flexible tables/desks/standing desks and appropriate student seating for twenty- five (25) • Kidney shaped or U-shaped small group instruction table with chairs • Student chairs/stools along countertops for task work Teacher Furniture • Teacher desk/chair Other Furniture • Corner with soft seating Classroom Technology • Classroom technology per Granby District Standards Computers • Teacher technology per Granby District Standards
Page 52
April 2026
Granby Memorial Middle School, Granby, CT Page 11
UNIFIED ARTS PROGRAMS
VISUAL ARTS CLASSROOM
SPACE: 1,100 square feet for classroom
350 square feet for Kiln Room and Storage
NUMBER: One (1) classroom
Sinks
• Minimum two (2) deep sinks with clay traps in addition to one (1) student
accessible sink all in same location
• Paint-resistant countertops
Classroom Storage • Lockable closets
• Easily accessible cabinets and shelves
• Vertical file tub-storage cabinets with locks
• Two (2) kitchen-type mobile carts with shelves
• Draftsman cabinet file for large paper/poster storage
Teacher Storage • Lockable teacher storage wardrobe
• One (1) lockable four-drawer filing cabinet
Student Storage • Space to store student work in progress; one area per classroom
Lighting • North facing classroom, preferable
Flooring • VCT/VCP tile
Display • Locked showcase on room’s corridor wall (and others throughout building)
• Magnetic whiteboard
• Bulletin Board
Student Furniture • Twenty-five (25) adjustable chairs/stools
• Six (6) adjustable worktables (rectangular) to seat four (4)
Teacher Furniture • Teacher desk/chair
• Demonstration table
Special Needs/Equipment • One (1) kiln (to be appropriately located and sized) with ventilation system
• Drying racks
• Book racks and magazine shelves (fine arts area)
• Four (4) sturdy wooden adjustable painting easels
• Two (2) large rolling waste barrels
• Eyewash station
• Paper cutter
Classroom Technology • Classroom technology per Granby District Standards
Computers • Teacher technology per Granby District Standards
FAMILY CONSUMER SCIENCE CLASSROOM
SPACE: 1,600 square feet
NUMBER: One (1) classroom
Home Kitchen Stations (6)
• Electric stove/oven
• Double sink
• Microwave
• Heat-proof countertops
• Kitchen cabinetry; keep view of area open for supervision/observation
• At least one station ADA compliant
• OSHA standards
• Ventilation Page 53
April 2026 Granby Memorial Middle School, Granby, CT Page 12 FAMILY CONSUMER SCIENCE CLASSROOM Home Kitchen Area (to be shared among stations) • One (1) large refrigerator • One (1) large freezer • Two (2) dishwashers • One (1) washer/dryer • Dry storage cabinet Community Storage Pantry • Open wire racks Classroom Area • Six (6) high-top tables (counter-top height) • Appropriate seating for 25 • Demonstration table with projection • Access to outdoor kitchen garden Teacher Storage • Lockable teacher storage wardrobe • One (1) lockable four-drawer filing cabinet Classroom Storage • Large built-in storage cabinet (closed storage for student materials) Lighting • Soft, dimmable lighting Flooring • VCT/VCP tile Display • Magnetic whiteboards • Bulletin Boards Teacher Furniture • Teacher desk/chair Classroom Technology • Classroom technology per Granby District Standards Computers • Teacher technology per Granby District Standards MUSIC APPRECIATION CLASSROOM SPACE: 1,000 square feet NUMBER: One (1) classroom Sinks • Small sink/fountain area in General Music room Classroom Storage • Music cabinets for sheet music storage • Built-in bookcase • Storage for Orff (or the like) instruments for general music classroom Teacher Storage • Lockable teacher storage wardrobe • One (1) lockable four-drawer filing cabinet Lighting • Soft color, dimmable lighting Flooring • VCT/VCP tile Display • Two 8 ft. whiteboards, one with permanent musical staff lines Student Furniture • Twenty-five (25) stackable stools in general music room Teacher Furniture • Teacher desk/chair Other Furniture • Piano in general music room Special Accommodations • General music room needs open space for movement and varied activities • Sound deadening/soundproof walls Classroom Technology • Sound system • Classroom technology per Granby District Standards Computers • Teacher technology per Granby District Standards • Computer with access to high quality sound system control MUSIC PROGRAM STORAGE SPACE: 250 square feet NUMBER: One (1) room Access • In proximity to general music classroom
Page 54
April 2026
Granby Memorial Middle School, Granby, CT Page 13
MUSIC PROGRAM STORAGE
Storage • Built-in lockable storage for instruments (keyboards, guitars, drums, etc.)
Lighting • Soft color, dimmable lighting
Flooring • VCT/VCP tile
PHYSICAL EDUCATION
SPACE: Gymnasium: 6,660 square feet
PE Office: 300 square feet (Two offices @ 150 s.f.)
PE Storage: 600 square feet
Chair Storage: 200 square feet
Toilets • Toilets within close proximity to gymnasium for student use
Water Fountain • Recessed drinking fountains/ bottle fill stations located outside the gymnasium
Access • Access to outdoor fields
Storage • Storage area will have access from both the interior of the gymnasium, as well
as the exterior of the building (for outdoor sports and instructional activities); a
roll-up exterior access door is desired
• Six (6) shelving units (48”x18”x72”) inside storage facility
• Folding seating/carts/storage for entire student body, staff and faculty (separate
storage from PE equipment)
Lighting • Lighting with safety cages or equivalent
Flooring • Wooden floor system with essential markings
• Protective matting
Special Accommodations • Sound deadening/soundproof walls
• Retractable bleacher seating on one side of the gymnasium
• Clerestory windows with remote room darkening shade system
• High ceiling, the lowest features should be a minimum of 22 ft. from the floor
• Wall matting around entire perimeter, from height of wall base to 6’-0”
minimum above finish floor
• Two (2) main and four (4) side baskets for basketball (all adjustable for height
and electrically operated)
• Volleyball post recessed floor sleeves
• Chinning bars
• Horizontal bar
• Divider curtain
• Ceiling mounts for cargo nets and rope climbing
• One wall to be designated for future climbing, wall mounted equipment, and the
masonry cores filled with concrete
• Movable cart for storage/equipment
• Two (2) AED with audible alarm box will be installed; one (1) in the public
access hallway outside nurse’s office, and one (1) outside the gymnasium
Classroom Technology • One (1) teacher computer
• Portable Interactive Board system, or similar device for classroom instruction
• Built-in sound system for assemblies and programs
WELLNESS EDUCATION CLASSROOM
SPACE: 900 square feet
NUMBER: One (1) classroom
Toilet • Toilet facilities located in close proximity to classroom Page 55
April 2026 Granby Memorial Middle School, Granby, CT Page 14 WELLNESS EDUCATION CLASSROOM Sinks • Stainless steel sink with laminate countertops • Soap and towel dispenser Classroom Storage • Built-in bookcases • Storage areas for anchor charts, large bins/kits • Classroom library storage • Counters under windows where possible Teacher Storage • Lockable teacher storage wardrobe for 1 adult • One (1) lockable four-drawer filing cabinet Lighting • Soft color, dimmable lighting Flooring • VCT/VCP tile Display • Magnetic whiteboards • Bulletin Boards Student Furniture • Two (2) tables • Flexible seating/tables to accommodate up to twenty-five (25) students Teacher Furniture • One (1) Teacher desk/chair Classroom Technology • Classroom technology per Granby District Standards Computers • Teacher technology per Granby District Standards TECHNOLOGY LAB - WOODWORKING SPACE: 1,200 square feet NUMBER: One (1) classroom Sinks • Utility sink • Sink/handwashing station • Eye and body wash Classroom Storage • Secured tool storage and materials storage • Lumber storage • Personal protective equipment storage • One wall with upper closed storage and open storage under counter Teacher Storage • Lockable teacher storage wardrobe • One (1) lockable four-drawer filing cabinet Student Storage • Space to store student work in progress; one area per classroom Lighting • Soft color, dimmable lighting Flooring • Flooring material to allow for ease of cleaning and durability Display • Multiple magnetic whiteboards • Bulletin boards Student Furniture • Twenty-five (25) adjustable stools • Seven (7) adjustable worktables (counter-top height) to seat four (4) Teacher Furniture • Teacher desk/chair Special Needs/Equipment • Permanent placement of equipment such as table saw, band saw, jointer, radial arm saw, sanders, and drill press with required clearances for safe operation • Dust collection • Compressed air with hose reels distributed throughout • Fire extinguisher/fire blanket • Emergency shut offs • Overhead door • All safety requirements per OSHA standards Classroom Technology • Classroom technology per Granby District Standards Computers • Teacher technology per Granby District Standards
Page 56
April 2026 Granby Memorial Middle School, Granby, CT Page 15 TECHNOLOGY LAB - CAD SPACE: 1,000 square feet (each) NUMBER: One (1) room Access • Adjacent to Woodworking Lab with windows between the two labs and connecting door Lighting • Soft color, dimmable lighting Flooring • VCT/VCP tile Display • Whiteboards • Bulletin Boards Student Furniture • Computer furniture/workstations and seating for twenty-five (25) students Teacher Furniture • Teacher Desk/Chair Classroom Technology • Classroom technology per Granby District Standards • 3-D printer Teacher Technology • Teacher technology per Granby District Standards ELECTIVE PROGRAMS BAND CLASSROOM SPACE: 1,500 square feet NUMBER: One (1) classroom Sinks • Small sink/water bottle refill area • Large sink in Instrumental Music Room to submerge brass instruments for cleaning (3’ wide by 8’ deep) Access • In proximity to platform/stage • Music rooms adjacent to each other • Instrumental room ideally located near bus entrance for easy drop off/pick up of instruments Lighting • Soft color, dimmable lighting Flooring • LVT/VCP tile Display • Two 8 ft. whiteboards, one with permanent musical staff lines Student Furniture • Eighty (80) posture/stackable chairs • Eighty (80) music stands • Instrumental lessons and large group ensembles require 48” of space per student Other Furniture • One (1) conductor stand • Large Move and Store cart for music stands • Electronic keyboard Special Accommodations • Acoustical treatment for each room Classroom Technology • Sound system • Classroom technology per Granby District Standards Computers • Teacher technology per Granby District Standards • Computer with access to high quality sound system control CHORUS CLASSROOM SPACE: 1,500 square feet NUMBER: One (1) classroom
Page 57
April 2026 Granby Memorial Middle School, Granby, CT Page 16 CHORUS CLASSROOM Sinks • Small sink/water bottle refill area Access • In proximity to platform/stage • Music rooms adjacent to each other Lighting • Soft color, dimmable lighting Flooring • LVT/VCP tile Display • Two 8 ft. whiteboards, one with permanent musical staff lines Student Furniture • Eighty (80) posture/stackable chairs Other Furniture • One (1) conductor stand • Performance risers for concerts (to be used on stage) • Electronic keyboard Special Accommodations • Acoustical treatment for each room • ADA compliant raised floor levels to simulate risers in choral room • Storage for performance risers Classroom Technology • High-quality sound system • Classroom technology per Granby District Standards Computers • Teacher technology per Granby District Standards • Computer with access to high quality sound system control ORCHESTRA CLASSROOM SPACE: 1,200 square feet NUMBER: One (1) classroom Sinks • Small sink/water bottle refill area Access • In proximity to platform/stage • Music rooms adjacent to each other • Instrumental room ideally located near bus entrance for easy drop off/pick up of instruments Lighting • Soft color, dimmable lighting Flooring • LVT/VCP tile Display • Two 8 ft. whiteboards, one with permanent musical staff lines Student Furniture • Eighty (80) posture/stackable chairs • Eighty (80) music stands • Instrumental lessons and large group ensembles require 48” of space per student Other Furniture • One (1) conductor stand • Large Move and Store cart for music stands • Electronic keyboard Special Accommodations • Acoustical treatment for each room Classroom Technology • Sound system • Classroom technology per Granby District Standards Computers • Teacher technology per Granby District Standards • Computer with access to high quality sound system control PRACTICE ROOMS SPACE: 80 square feet NUMBER: Four (4) rooms Lighting • Soft color, dimmable lighting Flooring • VCT/VCP tile Student Furniture • Four (4) student chairs and music stands
Page 58
April 2026 Granby Memorial Middle School, Granby, CT Page 17 PRACTICE ROOMS Accommodations • Door with large window for supervision • Sound-proofing treatment MUSIC LIBRARY/STORAGE SPACE: 200 square feet NUMBER: One (1) room Access • Adjacent to Music Classrooms Storage • Built-in file system to accommodate music libraries Lighting • Soft color, dimmable lighting Flooring • LVT/VCP tile INSTRUMENT STORAGE SPACE: 350 square feet NUMBER: One (1) room Student Storage • Built-in lockable storage for instruments Lighting • Soft color, dimmable lighting Flooring • LVT/VCP tile SHARED MUSIC OFFICE SPACE: 200 square feet NUMBER: One (1) room (shared by three staff) Teacher Storage • Lockable teacher storage wardrobe for three (3) adults • Three (3) lockable four-drawer filing cabinet Lighting • Soft color, dimmable lighting Flooring • VCT/VCP tile Display • Magnetic whiteboard • Bulletin Boards Teacher Furniture • Three (3) Teacher desks/chairs Computers • Teacher technology per Granby District Standards
Page 59
April 2026
Granby Memorial Middle School, Granby, CT Page 18
GENERAL EDUCATION SUPPORT SERVICES
LIBRARY MEDIA CENTER
SPACE: 3,305 square feet Total:
Library – 1,405 square feet
Innovative Tech Classroom – 1.000 square feet
Media Center Office – 150 square feet
Media Center Workroom/Storage – 250 square feet
Media Center Collaboration Space – 200 square feet
Technology Prep Room – 300 square feet
Access • Centrally located in the school
• Access to outdoor garden area, desirable
• Adjacent to Innovative Tech Lab
Storage • Audio-visual storage cabinets
• Over-size vertical filing cabinet
• Storage/display for teacher resources and professional development materials
Teacher Storage • Two (2) lockable four-drawer filing cabinets
Lighting • Remote control room darkening blinds
Flooring • Carpet tiles
Display • Magnetic whiteboards
• Bulletin Boards
• Well-placed and secure space for displays and promotional materials
Student Furniture • Tables and chairs; easy to reconfigure
• Computer furniture/workstations for six (6) student computers for accessing
online catalogue
Teacher Furniture • Two (2) teacher desks/chairs; Two (2) adult chairs
Other Furniture • 48-inch free standing, double-faced shelving for student print materials; on
wheels for adjusting space layout
• Comfortable lounge style seating – adult and student
Space Considerations • Area for independent study; separate area for whole class instruction
• Maker Space area
• Space should be able to accommodate staff professional development activities
Classroom Technology • Sufficient outlets to support all technology; some floor outlets
• Sound system for large group events
• Online circulation system
• Large screen interactive system
• Classroom technology per Granby District Standards
• Large printer
Computers • Teacher technology per Granby District Standards
GUIDANCE COUNSELING CENTER
SPACE: 450 square feet
Access • In close proximity to?
Lighting • Soft color, dimmable lighting
Storage • Closed cabinetry
Flooring • VCT/VCP tile
Display • Multiple Whiteboards
• Bulletin Boards Page 60
April 2026 Granby Memorial Middle School, Granby, CT Page 19 GUIDANCE COUNSELING CENTER Furniture • Four (5) student tables and chairs to accommodate 16 Classroom Technology • Classroom technology per Granby District Standards Computers • Teacher technology per Granby District Standards GUIDANCE COUNSELOR OFFICE SPACE: 150 square feet NUMBER: Two (2) rooms Storage • One (1) lockable four-drawer filing cabinet • Bookcase and closed shelving Lighting • Soft color, dimmable lighting Flooring • VCT/VCP tile Display • Magnetic whiteboard • Bulletin Board Teacher Furniture • Teacher desk/chair Other Furniture • One (1) adult visitor chair • One (1) table, with 4 student chairs Computers • Teacher technology per Granby District Standards GUIDANCE SUPERVISOR OFFICE (6-12) SPACE: 150 square feet NUMBER: One (1) office Storage • One (1) lockable four-drawer filing cabinet • Bookcase and closed shelving Lighting • Soft color, dimmable lighting Flooring • VCT/VCP tile Display • Magnetic whiteboard • Bulletin Board Teacher Furniture • Teacher desk/chair Other Furniture • One (1) adult visitor chair • One (1) table, with 4 student chairs Computers • Teacher technology per Granby District Standards GUIDANCE CONFERENCE ROOM/CLASSROOM SPACE: 450 square feet NUMBER: One (1) room Access/Location • Within the Guidance Suite Storage • Built-in closed storage Lighting • Soft color, dimmable lighting Flooring • VCT/VCP tile Office Furniture • Conference Table • Seating for ten (10) Other Accommodations • Magnetic whiteboard • Bulletin board Technology • Polycom telephone • Large screen interactive system
Page 61
April 2026 Granby Memorial Middle School, Granby, CT Page 20 GUIDANCE CONFERENCE ROOM/CLASSROOM Computers • One (1) computer GUIDANCE FILE ROOM SPACE: 200 square feet NUMBER: One (1) room Access/Location • Adjacent to Guidance offices Storage • Four (4) three-drawer lateral filing cabinets; lockable Lighting • Soft color, dimmable lighting Flooring • VCT/VCP tile Furniture • One (1) Table • Two (2) adult chairs GENERAL EDUCATION INTERVENTION SERVICES – READING AND MATH SPACE: 450 square feet for Reading and Math NUMBER: Two (2) rooms Access • In close proximity to general education classrooms Classroom Storage • Built-in bookcases • Supply closets with shelving installed in each room • Counters under windows where possible • Separate literacy book closet in centralized location to classrooms Teacher Storage • Lockable teacher storage wardrobe for three (3) adults • Two (2) lockable four-drawer filing cabinets (each office) Lighting • Soft color, dimmable lighting Flooring • VCT/VCP tile Display • Magnetic whiteboards • Bulletin Boards Student Furniture • Moveable work tables to allow for open space for movement within Math Intervention space Teacher Furniture • One (1) Teacher desk/chair • Two (2) horseshoe/kidney-shaped tables with chairs to accommodate 6 students Other Furniture • Visitor’s chairs Classroom Technology • Classroom technology per Granby District Standards Computers • Teacher technology per Granby District Standards SPECIAL EDUCATION PROGRAMS SPECIAL EDUCATION RESOURCE SPACE 450 square feet NUMBER: Four (4) classrooms (1 per team) Access • Close proximity to general education classrooms and to each other • Close proximity to related services (SW/Psych/SLH), preferred Classroom Storage • Built-in bookcases • Storage areas • Counters under windows where possible
Page 62
April 2026 Granby Memorial Middle School, Granby, CT Page 21 SPECIAL EDUCATION RESOURCE Teacher Storage • Lockable teacher storage wardrobe for three (3) adults • One (1) lockable four-drawer filing cabinet • Access to shared testing materials Lighting • Soft color, dimmable lighting Flooring • VCT/VCP tile Display • Magnetic whiteboards • Bulletin Boards Student Furniture • Student tables/chairs (adjustable/movable) Teacher Furniture • Teacher desks/chairs Other Furniture • Adult visitor chair • Activity Groups: Two (2) tables with six (6) chairs • Portable dividers • Sensory area Classroom Technology • Classroom technology per Granby District Standards Computers • Teacher technology per Granby District Standards LIFE SKILLS CLASSROOM SPACE: 600 square feet NUMBER: One (1) classroom Toilet • Toilet facility with changing table and storage • Epoxy flooring Sinks • Stainless steel sink with laminate counter • Soap and towel dispenser Classroom Storage and Arrangement • Built-in bookcases, storage areas, large-drawer storage • Kitchen (refrigerator, microwave, washer/dryer, cabinets for dishware, utensils) • Counters under windows where possible Teacher Storage • Lockable teacher storage wardrobe for three (3) adults • One (1) lockable four-drawer filing cabinet Student Storage • 10 coat hooks/storage • Cubby storage for 10 students Lighting • Soft color, dimmable lighting Flooring • VCT/VCP tile Display • Magnetic whiteboards • Bulletin Boards Student Furniture • Tables and appropriate student furniture for program activities • Soft furniture Teacher Furniture • Teacher Desk/Chair; adult chair Special Needs/Equipment • Separate area for calming, de-stress (Sensory Room: soft furniture; soft dimmable lighting) • Individual learning stations • Common meeting area Classroom Technology • Classroom technology per Granby District Standards Computers • Teacher technology per Granby District Standards SPEECH/LANGUAGE/HEARING SERVICES SPACE: 175 square feet NUMBER: One (1) office Storage • One (1) lockable four-drawer filing cabinet
Page 63
April 2026 Granby Memorial Middle School, Granby, CT Page 22 SPEECH/LANGUAGE/HEARING SERVICES • Bookcases and shelving (open and closed shelving) Lighting • Soft color, dimmable lighting Flooring • VCT/VCP tile Display • Magnetic whiteboard • Bulletin Board Teacher Furniture • Teacher desk/chair Other Furniture • Two (2) adult chairs • One (1) table, with 4 student chairs Special Needs/Equipment • Built-in mirror Computers • Teacher technology per Granby District Standards PSYCHOLOGIST OFFICE SPACE: 150 square feet NUMBER: One (1) office Storage • One (1) lockable four-drawer filing cabinet • Bookcase and closed shelving Lighting • Soft color, dimmable lighting Flooring • VCT/VCP tile Display • Magnetic whiteboard • Bulletin Board Teacher Furniture • Teacher desk/chair Other Furniture • Two (2) adult chairs • One (1) table, with 4 student chairs Computers • Teacher technology per Granby District Standards OT / PT RESOURCE ROOM SPACE: 450 square feet NUMBER: One (1) room with large walk-in closet for storage Sinks • One (1) stainless steel sink with laminate countertops • Soap and towel dispenser Access • In the vicinity of general education classrooms Classroom Storage • Built-in bookcases, cabinets (variety of open and closed) • Walk-in storage for large equipment • Counters under windows where appropriate Lighting • Soft color, dimmable lighting Flooring • VCT/VCP tile • Four (4) panel mats (6’x12’) Display • Whiteboard • Bulletin Boards Special Needs/Equipment • Capability to suspend therapeutic swing from ceiling • Three (3) fine motor centers Teacher Storage • Lockable teacher storage wardrobe for two (2) adults • Two (2) lockable four-drawer filing cabinets Teacher Furniture • Two (2) Teacher Desk/Chairs Computers • Teacher technology per Granby District Standards
Page 64
April 2026 Granby Memorial Middle School, Granby, CT Page 23 SOCIAL WORKER OFFICE SPACE: 150 square feet NUMBER: One (1) office Storage • One (1) lockable four-drawer filing cabinet • Bookcase and closed shelving Lighting • Soft color, dimmable lighting Flooring • VCT/VCP tile Display • Magnetic whiteboard • Bulletin Board Teacher Furniture • Teacher desk/chair Other Furniture • Two (2) adult chairs • One (1) table, with 4 student chairs Computers • Teacher technology per Granby District Standards STUDY SKILLS PROGRAM SPACE 450 square feet NUMBER: One (1) classroom Access • Close proximity to general education classrooms and to each other • Close proximity to related services (SW/Psych/SLH), preferred Classroom Storage • Built-in bookcases • Storage areas • Counters under windows where possible Teacher Storage • Lockable teacher storage wardrobe for three (3) adults • One (1) lockable four-drawer filing cabinet Lighting • Soft color, dimmable lighting Flooring • VCT/VCP tile Display • Magnetic whiteboards • Bulletin Boards Student Furniture • Student tables/chairs (adjustable/movable) for fifteen (15) students Teacher Furniture • Teacher desks/chairs Other Furniture • Adult visitor chair • Activity Groups: Two (2) tables with six (6) chairs • Portable dividers • Sensory area Classroom Technology • Classroom technology per Granby District Standards Computers • Teacher technology per Granby District Standards SUPERVISOR’S OFFICE SPACE: 150 square feet NUMBER: One (1) office Storage • One (1) lockable four-drawer filing cabinet • Bookcase and closed shelving Lighting • Soft color, dimmable lighting Flooring • VCT/VCP tile Display • Magnetic whiteboard • Bulletin Board Teacher Furniture • Teacher desk/chair
Page 65
April 2026 Granby Memorial Middle School, Granby, CT Page 24 SUPERVISOR’S OFFICE Other Furniture • Two (2) adult chairs Computers • Teacher technology per Granby District Standards ADMINISTRATION & SUPPORT SERVICES Unless otherwise noted, the standard furnishings for every area noted below are expected to include the following: • Room darkening shades • Acoustical insulation for soundproofing • Year-round air conditioning • ADA compliant building standards • Wireless/internet access • Multiple electric outlets • Telephone PRINCIPAL’S OFFICE SPACE: 200 square feet Access/Location • Close proximity to secretary’s workstation and conference room Storage • One (1) large wall unit bookcase • Lockable lateral files Lighting • Soft color, dimmable lighting Flooring • VCT/VCP tile Office Furniture • Desk/Chair/Credenza • Visitor seating for four (4) Other Accommodations • Bulletin board • White board • Private lavatory Technology • Polycom telephone • Building security system monitor • Security “panic” button with dedicated phone line • Large screen interactive board Computers • Administrator technology per Granby District Standards ASSISTANT PRINCIPAL’S OFFICE SPACE: 175 square feet Access/Location • Close proximity to secretary’s workstation and conference room Storage • One (1) large wall unit bookcase • Lockable lateral files Lighting • Soft color, dimmable lighting Flooring • VCT/VCP tile Office Furniture • Desk/Chair/Credenza • Visitor seating for four (4) Other Accommodations • Bulletin board Technology • Polycom telephone • Building security system monitor • Security “panic” button with dedicated phone line • Large screen interactive board Computers • Administrator technology per Granby District Standards
Page 66
April 2026 Granby Memorial Middle School, Granby, CT Page 25 MAIN OFFICE (SECRETARIAL AREA) SPACE: 800 square feet Access/Location • Adjacent to principal’s office • Main hallway wall should have multiple windows, and the Main Office should be able to view main entranceway of school and bus and/or visitor traffic • Connecting door between office and health suite • Staff lavatory within main office area Storage • Staff mailboxes within main office area • Base and wall cabinets with counter space • Lockable files for student confidential records, table and chairs (separate room) Lighting • Soft color, dimmable lighting Flooring • VCT/VCP tile Office Furniture • Two (2)Secretarial workstations (situated to face office entry) • Secretarial chairs • Security Officer station within main office/entry area (if required) • Additional worktable/counter area to separate secretarial space from waiting area • Visitor waiting area; seating for four (4) Other Accommodations • Bulletin boards • Closet for coats • Copy/Supply Room • Kitchenette counter, small refrigerator, sink, microwave Technology • Network copier/fax machine • Building security system monitor (secretary/clerk) • Security “panic button with dedicated phone line (secretary/clerk) • Radio charging station • Parent access Kiosk computer Computers • Office technology per Granby District Standards INSTRUCTIONAL SPECIALIST OFFICE SPACE: 150 square feet Storage • One (1) large wall unit bookcase • Lockable lateral files Lighting • Soft color, dimmable lighting Flooring • VCT/VCP tile Office Furniture • Desk/Chair/Credenza • Visitor seating for four (4) Other Accommodations • Bulletin board Technology • Large screen interactive board Computers • Administrator technology per Granby District Standards LIERACY SPECIALIST OFFICE SPACE: 150 square feet Storage • One (1) large wall unit bookcase • Lockable lateral files Lighting • Soft color, dimmable lighting Flooring • VCT/VCP tile Office Furniture • Desk/Chair/Credenza • Visitor seating for four (4)
Page 67
April 2026 Granby Memorial Middle School, Granby, CT Page 26 LIERACY SPECIALIST OFFICE Other Accommodations • Bulletin board Technology • Large screen interactive board Computers • Administrator technology per Granby District Standards MATH COACH OFFICE SPACE: 150 square feet Storage • One (1) large wall unit bookcase • Lockable lateral files Lighting • Soft color, dimmable lighting Flooring • VCT/VCP tile Office Furniture • Desk/Chair/Credenza • Visitor seating for four (4) Other Accommodations • Bulletin board Technology • Large screen interactive board Computers • Administrator technology per Granby District Standards CONFERENCE ROOM SPACE: 300 square feet NUMBER: One (1) room Access/Location • One adjacent to Main Office/Principal’s Office and one near related services Storage • One (1) credenza Lighting • Soft color, dimmable lighting Flooring • VCT/VCP tile Office Furniture • Conference Table • Seating for ten (10) Other Accommodations • Magnetic whiteboard • Bulletin board Technology • Polycom telephone • Large screen interactive system Computers • One (1) computer HEALTH SERVICES SPACE: 800 square feet Toilet • Oversized accessible toilet room with sink and changing table • Epoxy flooring Sink • Sink with foot pedal controls (outside Toilet room) • Sink with eye wash Access/Location • Access to main office for assistance during times of emergency • Access through main corridor • Access to natural light; windows Lighting • Soft color, dimmable lighting Flooring • VCT/VCP tile Storage • Lockable cabinets for medication and medical supplies • Four (4) four-drawer lockable filing cabinets • Closet and extra storage for materials Office Furniture • Desk/chair facing room entry
Page 68
April 2026
Granby Memorial Middle School, Granby, CT Page 27
HEALTH SERVICES
• Bookcase
• Table for testing/conferences (private)
• Four (4) student chairs for waiting area
Space Considerations • Recovery area with 3 cots with privacy curtains
• Private space/office where nurse can speak privately with students/parents
• Examination room
• 25-ft space to conduct vision screenings
Medical Equipment • Wheelchair/evac chair
• Magnifying lamp
• Rolling cart (portable emergency cart)
• Examination table (separate room)
Other Accommodations • AED with audible alarm box will be installed in the public access hallway.
• Refrigerator with separate frost-free freezer compartment
Technology • One (1) telephone with direct access to an outside line and ability to access
classrooms; separate phone for student use
• Portable phone for nurse
• Fax machine
• Printer
Computers • Health Room technology per Granby District Standards
TEACHER WORKROOM
SPACE: 450 square feet
Access/Location • Close proximity to classroom area
Lighting • Soft color, dimmable lighting
Flooring • VCT/VCP tile
Storage • Shelving and cabinets
Furniture • Table and six (6) chairs
Other Accommodations • Laminating machine
• General office supplies
Technology • Network copier/fax machine/scanner
Computers • One (1) teacher computer
FOOD SERVICES – CAFETERIA
SPACE: 2,340 square feet (enrollment [401] /3 lunch waves x 17.5 sf)
+900 square feet (platform/stage)
Sink • Bay sink with foot pedal for hand washing and Purell stations for students
• Water bottle filler
Access/Location • Adjacent to full kitchen and serving area
• Exits to outdoors
Lighting • Soft color, dimmable lighting
Flooring • Resilient textured rubber flooring
Storage • Storage room to accommodate tables/benches and chairs
Furniture • Folding roll-away tables/benches with built-in seating, to accommodate
approximately 130 students
• Chair and desk for paraprofessional/cafeteria supervisor Page 69
April 2026 Granby Memorial Middle School, Granby, CT Page 28 FOOD SERVICES – CAFETERIA Other Accommodations • Recessed drinking fountains • Sound reducing measures • Sound proof divider between kitchen and cafeteria • Multiple display monitors Platform (Stage) • Two (2) sections of portable risers for use with the platform (one on the floor, and one on the platform) • Stage curtains and stage lighting • Drop down screen with projection system • High quality sound system • Drop-down acoustical wall at stage proscenium Technology • Localized public address system FOOD SERVICES – KITCHEN SPACE: 1,150 square feet – Kitchen 150 square feet – Food Manager’s Office Toilet • Locker room for five (5) with adjacent unisex toilet room Sink • One (1) three bay sink with drain board and garbage disposal • One (1) double well stainless-steel produce sink • One (1) triple well stainless-steel pot wash sink • Three (3) hand sinks with soap and towel dispensers Access/Location • In close proximity to Gymnasium Lighting • Task lighting over preparation areas Flooring • Epoxy flooring Storage • Safe • Four (4) stainless steel utility carts, three shelves, #300/400 capacity • One (1) stainless steel cart for tray storage, ADA accessible • Adequate space for annual supplies Furniture • Teacher desk/chair • Visitor’s chair Space Considerations • Large walk-in storeroom with heavy-duty wire mesh chrome-mate shelving on casters • Dishwasher room with necessary utilities (racks and tray carts) • Separate area for the cashier to count money with a safe • Two (2) serving lines with built-in hot and cold units • Can washing area (outside, near dock – custodial)
Page 70
April 2026 Granby Memorial Middle School, Granby, CT Page 29 FOOD SERVICES – KITCHEN Food Services Equipment • One (1) slicer on stand • One (1) double steamer, pressure-less • Table top mixer • Two (2) double convection ovens with stand: single one-over-one unit • Two-burner stove top • Char broiler Grill • Sandwich Slide • Self-serve pizza counter • Deli Unit • Sono • Two (2) small double kettles • One (1) food processor (Robo Coupe) • Walk-in freezer, minimum 100 square ft. with shelving • Walk-in refrigerator, minimum 100 square ft. with shelving • One (1) pass-through refrigerator near serving line • Pass-through warmer • Free-standing warmer on wheels • Steam table with five (5) wells • Cold well in serving line for fruits, vegetables and salads • Option to change drop-in units to go hot or cold • Two (2) preparation tables (stainless steel) • One (1) baking center with table, baking rack with refrigerator underneath • Milk cooler • Ice cream freezer • Open-air cooler in front of registers • Exhaust fans (ventilation) for ovens, skillet, stove, etc. • Exhaust fans (ventilation) in washroom and pantry areas Technology • Two (2) cash registers and stand (point of sale system) • One (1) computer (Food Services Office) FACULTY LOUNGE SPACE: 600 square feet Access • Centrally located Toilet • Faculty toilets adjacent to faculty lounge Sink • Stainless steel sink with laminate counter • Soap and towel dispenser Lighting • Provide windows and maximize natural light Flooring • VCT/VCP tile Storage • Built-in upper and lower cabinets Furniture • Soft seating • Tables and seating for twenty (20) people Other Accommodations • Private room for phone calls, etc. Equipment • Microwave oven • Refrigerator • Coffee maker CUSTODIAL OFFICE AND CUSTODIAL STORAGE SPACE: 800 square feet Toilet • Locker room for four (4) with adjacent unisex toilet room
Page 71
April 2026 Granby Memorial Middle School, Granby, CT Page 30 CUSTODIAL OFFICE AND CUSTODIAL STORAGE Access/Location • In close proximity to Cafeteria; loading/receiving dock/mechanical room Flooring • VCT/VCP tile Storage • Locked cabinet • Storage for outdoor equipment with access to exterior door • Storage for chemical/cleaning supplies • Storage for interior cleaning machines with charging stations Furniture • Desk/Chair • Three (3) adult chairs Computers • Custodial technology per Granby District Standards STORAGE SPACE: 800 square feet – Instructional Storage (Literacy Book Room; Grade 6 storage; Grade 7 storage; Grade 8 storage) 800 square feet – General Storage (These storage spaces are separate from custodial storage spaces for supplies and equipment; accounted for above.) VIII. COMMUNITY USE Granby Public Schools facilities serve as a vital resource for the community, providing space for a variety of programs and events that benefit students, families, and local organizations. The use of school buildings extends beyond the academic day, supporting activities that enrich the community and provide essential services: • Granby Parks and Rec uses the gym, cafeteria and library for basketball and other after school and town activities; • Granby Education Foundation uses the gym and library for fundraising events such as the annual "Puzzle Slam;" • GMMS is the town shelter location for town emergencies including power outages/storms; • The Parent Advisory Council meets in the library; • All district committee meetings for professional development, leadership and advisories meet in the GMMS library; • After School clubs are held in classrooms, the cafeteria, and library; • Unified sports teams use the GMMS gym. By making school buildings available for community use, Granby Public Schools enhances access to essential programs, strengthens school-community partnerships, and maximizes the value of public facility. IX. ENVIRONMENT – SYSTEMS – EQUIPMENT SYSTEM SPECIFICATIONS Building Systems • The building systems incorporated into the new construction will be designed in accordance with Connecticut High Performance Building standards, equivalent in performance to a LEED Silver rating. Heating/Cooling (HVAC) System • Heating & cooling should be produced with natural gas with a boiler for heating and roof top DX cooling. • All spaces are to receive air conditioning, but only those areas with summertime use will have the systems running year-round; all other areas will have systems set to dehumidification only during summer months. Needs to be reviewed by Facilities and IT
Page 72
April 2026 Granby Memorial Middle School, Granby, CT Page 31 SYSTEM SPECIFICATIONS • Energy recovery units, VFD fan systems and pumps to be utilized in the design. • Perimeter heating will be provided by ceiling mounted radiant panels, cooled by a VAV system with each room served by a dedicated VAV box and hydronic reheat coil. • The use of “chill beams” will be considered for general heating and cooling. Designer to provide additional information on chill beam systems to Owner. • The gymnasium/auditorium and cafeteria will be served by separate variable speed air handlers. Air handlers shall include a hot water heating coil and DX cooling coils. Climate Controls/ Ventilation System • The building will be designed with Direct Digital Control (DDC) systems (Distech or Automate logic) centrally tied into the School Facilities Department via Graphical User Interface. • Spaces should have independent, on demand heating, cooling and ventilation control for operational efficiency. • Each classroom will be provided with a temperature sensor and carbon dioxide sensor. The carbon dioxide sensor is an energy saving device. By sensing the carbon dioxide within the room, the outside air intake is adjusted, reducing the amount of outside air being heated or cooled, resulting in less energy used. • Climate controls/ventilation systems need to meet current codes and standards. • MDF and IDFs must be climate controlled (A/C) Lighting System • Efficient and appropriate natural lighting will be maximized within the facility as appropriate for the programmatic use of the spaces. • Motion sensors and dual switching will be installed in classrooms. • The use of LEDs throughout, with exceptions in specialty areas. • Attention should be given to security lighting for both interior and exterior of the building. • Emergency back-up will be via local battery ballasts. • The use of light shelves and light sensors for natural light to reduce electrical load shall be considered in locations where possible. Electrical (Power) System • Power to be provided by local utility company. • Consider solar roof mounted. • Distribution will include customer metering. • Emergency (whole building) generator to accommodate Life Safety needs. • Generator must be sufficient to support critical IT equipment in MDF and all IDFs as well as administrative offices and Nurse’s office. • Generator must support critical kitchen equipment with the intention being to cook, serve, and store food. (Hoods, ovens, serving line, freezer, refrigeration, etc.)
Page 73
April 2026 Granby Memorial Middle School, Granby, CT Page 32 SYSTEM SPECIFICATIONS Technology • There shall be a combined voice/data system with “VOIP” (Voice Over Internet Protocol) design. An AVAYA on premise system should be installed in alignment with other schools and municipal buildings. • Interactive classroom displays with webcam and adequate sound output in every classroom and meeting space. In the current building there are 75-inch Viewsonic ViewBoards installed. • Desktop computers and monitors for all office staff • Laptop computers and docking stations for all staff members • Chrome Book charging stations in every room. • Chrome Books for each student • Kiosk displays/devices should be installed at main entrance, café, and main rotunda areas. • Security camera displays are needed for main office staff • Multiple data drops with sufficient power in every classroom and meeting space. • Latest generation full WIFI coverage throughout the entire building. Current system is Ubiquity • Shared printing stations to support multiple classrooms in convenient locations throughout the building. • Head end equipment to be housed in an MDF with 24-hour environmental control. Network switches to serve data and POE+ and/or current standard to all data port in the building. • Windows Domain and File Server. All IDF closets require 24-hour environmental control. • Horizontal cabling shall be Category 6e plenum rated or contemporary equivalent. • Cable shall be run in corridors to support horizontal cable structure. • Fiber backbone between the MDF and IDF rooms shall be capable of at least 10GB minimum anticipating future growth. • Fiber optical cable should be run from the high school MDF to the middle school to MDF and must support 10 GB as well as anticipate future growth. • Office space and workspace for Technology Personnel with sufficient data drops and power to support technology in the building. • Auditorium, lighting, sound, and projection systems should be installed • Café PA, sound, and projection systems should be installed • Storage for Technology Department is critical. Security • Digital video surveillance of exterior/interior areas of the building integrated with District system. • Electronic security system with keypad access control installed into the school. • Design the plan to prevent access to instructional areas of the school when community events take place in assembly areas during non-school hours. • Motion sensors shall be mounted in corridors. • Respond to future state and/or federal mandates related to security requirements for elementary facilities (i.e., panic button systems) • Door locks shall be Corbin Russwin and integrated with existing MPS system. Phone System • A comprehensive, district-integrated phone system (dial-out) will be integrated into technology scope of the project, including hands-free and handle options. • Must be capable of reporting originating room identification as part of E911 call. • Install phones in every room of the facility occupied by teachers or students at any given time, including all meeting, support and instructional spaces. • Provide Voice Over “IP” options.
Page 74
April 2026 Granby Memorial Middle School, Granby, CT Page 33 SYSTEM SPECIFICATIONS Public Address • The building’s public address system is comprehensive and will be addressed as part of the technology component of the project to incorporate internal building communications as well as external communications. • The PA system should be developed in conjunction with the phone, clock, data • PA system should be connected with “Panic Button” system for lockdown alerts, as well as Bell system, and phone system for paging. • Secondary access to security and public address systems will be located in the MDF/Head End Room. Clocks • Clocks, similar to the phone system will be integrated into the technology component of the project. • All support and instructional spaces will be included. • System to have manual override capability in the event that Daylight Saving Times are adjusted by the Federal Government. Plumbing System • Plumbing fixtures/system will be designed per current and applicable codes. • Fixtures will be self-operating • Plastic piping to be considered for domestic water and heating where possible. • Floor drains with trap primers in gang toilet areas • Plumbed for full whole building sprinkler system Fire Protection • Building will be fully protected by a sprinkler system installed per NFPA 13. • Waterless fire suppression systems required in MDF and IDFs with appropriate redundant detection. Fire Alarm • The building will be protected by a fully addressable analog, manual and automatic fire alarm system. This system should be open source as to not vendor lock. The current Notifier system is vendor locked. Acoustics • The building will comply with ANSI S12.60-2002: Acoustical Performance Criteria, Design Requirements and Guidelines for Schools. • Suspended acoustical ceilings and/or acoustical decks will be installed throughout the building. • Corridor walls should be constructed of glazed concrete masonry units, or materials with a comparable NRC rating, and provide an adequate separation for sound control. • In specialized areas, such as media centers, appropriate acoustical treatments will be installed. • Sound field system will be provided in each classroom. Windows/Doors • Windows should be high efficiency, non-operational type with low e-glazing. • Emergency egress windows and rated doors will be installed in accordance with applicable codes. • Consider key fobs, thumb latches, vision panels – review with District and integrate with security section. • Door locks and FOB system shall integrate with GPS system.
Page 75
April 2026 Granby Memorial Middle School, Granby, CT Page 34 X. SITE DEVELOPMENT There will be two primary entrance areas to the Middle School building: (1) the Main Entrance for visitors and parent drop off/pick up; (2) Student entrance for bus drop-off/pick up. Passive security measures, such as visual control of the entrances from the adjacent office areas, must be planned for. Active security measures and systems will be developed within the building design. Adequate lighting for monitoring activities and ensuring safety are of paramount importance at the building entrances. The entrance design should accommodate a separate bus loading and parent drop-off area. Entry overhangs or covered walkways will be provided for inclement weather to the extent practicable. Bus loading areas should be configured as a one-way drive in a direction to assure that loading and unloading of students occurs from the right-hand side of the vehicle adjacent to the building. The bus loading driveway should be located such that buses exit upstream of automobiles, thereby reducing delays. Parent drop-off areas will also be configured as a one-way drive in a direction to ensure that loading and unloading of students occurs from the right-hand side of the vehicle adjacent to the building. Student drop-off and pick-up areas are to be separated from the bus loading area, and preferably should be separate from other parking lots. A receiving/loading dock should accommodate 18-wheeler vehicles and should be located in such a way as not to interfere with primary entrance areas yet be close to kitchen/custodial areas. Sufficient parking for staff and visitors will be developed to take the multiple uses of the building into account. In determining the size and location of the parking lots, consideration will be given to the use of the building for community access as well as student safety. ADA and other code requirements will be addressed in the design of parking. Sidewalks will be featured around the perimeter of the school and shall be concrete with monolithic concrete curbing. Access to the parking lots, playfields, bus and parent pickup/drop-off areas, and access for student walkers will be addressed. The number of driveways that are crossed by sidewalks should be eliminated/minimized as much as practicable. The Middle School shall have an artificial turf multi-purpose field with a track as well as a baseball/softball field, both of which should have lighting. Athletic fields and playground areas shall include: controlled perimeter fencing; lockable gates for supervised access; and a fencing design that will maintain visibility while supporting security. Playfields, parking, service drives, drop-off zones and bus zones should be located in order to reduce the need for pedestrians to cross vehicular traffic lanes. The location of driveways, walkways and landscaping must permit adequate sight distances for both vehicles and pedestrians. Site utilities and physical plant components, including drives and access roads, will be located to avoid conflict with student and vehicular traffic, as well as the planned future growth of building components. Landscaping will be designed to allow the school to blend with the environment as well as to provide passive cooling and windbreaks when possible. Trees and other greenery will be of a hearty variety with a preference for native species and require little maintenance and which complement the building and site. Trees will be planted a sufficient distance from the building to avoid future maintenance problems. Consideration will be given to safety and security when placing foliage around walkways and areas of building access.
Page 76
April 2026 Granby Memorial Middle School, Granby, CT Page 35 GRANBY MEMORIAL MIDDLE SCHOOL EDUCATIONAL SPECIFICATIONS SPACE SUMMARY Room Description Required # of Rooms Square Feet Per Room Total Area (Sq. Feet) ON-TEAM PROGRAMS Academic Core Classroom – ELA 4 900 3,600 Academic Core Classroom – Math 4 900 3,600 Academic Core Classroom – Integrated Science 4 900 3,600 Academic Core Classroom – Global Studies/US History 4 900 3,600 Academic Core Classroom – World Languages 3 900 2,700 SUCCESS Program Classroom 1 900 900 Total 18,000 UNIFIED ARTS PROGRAMS Visual Arts Classroom 1 1,450 1,450 Family Consumer Science Classroom 1 1,600 1,600 Music Appreciation Classroom 1 1,000 1,000 Music Storage (Guitars/drums/xylophones, etc.) 1 250 250 Physical Education Program – Gymnasium 1 6,660 6,660 Physical Education Program – Office 2 150 300 Physical Education Program - Storage 1 600 600 Gymnasium – Chair Storage 1 200 200 Wellness Education Classroom 1 900 900 Technology Lab – Woodworking 1 1,200 1,200 Technology Lab – CAD 1 1,000 1,000 Total 15,160 ELECTIVE PROGRAMS Band 1 1,500 1,500 Chorus 1 1,500 1,500 Orchestra 1 1,200 1,200 Practice Rooms 4 80 320 Music Library/Storage 1 200 200 Instrumental Storage 1 350 350 Shared Office (for 3) 1 200 200
Page 77
April 2026 Granby Memorial Middle School, Granby, CT Page 36 Total 5,270 GENERAL EDUCATION SUPPORT SERVICES Library Media Center 1 1,405 1,405 Innovative Technology Classroom 1 1,000 1,000 Media Center Office 1 150 150 Media Center Workroom/Storage 1 250 250 Media Center Collaboration Space 1 200 200 Technology Prep Room 1 300 300 Guidance Counseling Center 1 450 450 Guidance Counselor Office 2 150 300 Guidance Supervisor Office (6-12) 1 150 150 Conference/Classroom 1 450 450 Guidance File Room 1 200 200 Reading Intervention Support 1 450 450 Math Intervention Support 1 450 450 Total 5,755 SPECIAL EDUCATION PROGRAMS Special Education Resource Room (1 per team) 4 450 1,800 Life Skills Classroom 1 600 600 Speech/Language/Hearing Office 1 175 175 Psychologist Office 1 150 150 OT/PT Resource Room/Storage 1 450 450 Social Worker Office 1 150 150 Study Skills Program 1 450 450 Supervisor’s Office 1 150 150 Total 3,925 ADMINISTRATION & SUPPORT SERVICES Principal’s Office 1 200 200 Assistant Principal’s Office 1 175 175 Main Office Secretarial Area 1 800 800 Instructional Specialist Office 1 150 150 Literacy Specialist Office 1 150 150
Page 78
April 2026 Granby Memorial Middle School, Granby, CT Page 37 Math Coach Office 1 150 150 Conference Room 1 300 300 Health Services 1 800 800 Teacher Workroom 1 450 450 Food Services – Cafeteria/Auditorium 1 2,340 2,340 Platform/Stage 1 900 900 Food Services – Kitchen and Manager’s Office 1 1,300 1,300 Faculty Lounge 1 600 600 Custodial Office Area and Storage 1 800 800 Instructional Storage throughout building 4 200 800 General Supply Storage 1 800 800 Total 10,715 Total Program Area 58,825 *The programmable spaces do not include circulation, mechanical spaces, bathrooms, or any spaces required but not determined at this time. It is recommended to add 30% for these additional space requirements.
Page 79
PROJECT PROPOSAL
GRANBY MEMORIAL HIGH SCHOOL
BASEBALL & SOFTBALL IMPROVEMENTS
Existing Conditions Aerial
Conceptual Layout
Date: January 19, 2026
Prepared For: Christopher DeGray, Director of Facilities – Granby Public Schools
Prepared By: Andrew Dyjak – Regional Vice President, New England
Chris Hulk, PE – Regional Vice President, New England
Jonathan Luster, PE – Regional Construction Manager, New England
Address: Granby Memorial High School| 54 N Granby Rd, Granby, CT 06035
This project proposal encompasses all facets of the project, with FieldTurf offering a comprehensive, turnkey solution
that includes design, project oversight, and construction. The project is based on current site conditions, review meeting
with the school, and the planned construction period in summer/fall 2026.
FieldTurf pricing is based on the Capital Region Education Council (CREC) program. CREC is a member of The Association
of Educational Purchasing Agencies (AEPA) program. The AEPA is a purchasing co-op that provides member schools with
pre-determined preferential pricing by approved vendors. Since the product has already been bid at the national level,
individual schools do not have to duplicate the formal bid process. AEPA IFB #024-A.
Click on the following AEPA hyperlink for more information: AEPA IFB #24-A.
All pricing includes prevailing wage.
Below is a detailed cost breakdown for site construction, turf installation and overall implementation of the project.
Page 80
PROJECT PROPOSAL BASE BID FIELD NAME Granby High School Baseball/Multipurpose Field SQUARE FOOTAGE +/- 138,000 s.f. PRODUCT FieldTurf Double Play Natural – FTVT-50 FIELD MARKINGS Baseball, Softball, Soccer, Lacrosse and Field Hockey TOTAL PRICE $ 3,147,505.00 Project Description: This project proposes to reconstruct the existing baseball to a new all-weather synthetic turf field with baseball, softball and overlay fields. FieldTurf will provide a turnkey project with all necessary engineering, design, construction and project oversite. The existing field will have all fencing, topsoil, irrigation, and clay removed. Earthmoving activities will be conducted to achieve proposed grades. The field will then have the concrete turf anchor curbing, stone base, and drainage system installed. Fencing of various heights and sizes will be installed and be integral to the concrete turf anchor curb. Additionally, new shade structure dugouts with a tension netting backstop system extending from one dugout to the other is proposed. Lastly, empty conduits will be installed for future/alternative lighting system to be installed at a later date. Additional scope items such new LED light fixtures, bleachers, and walkways have been added as alternates to the base bid. Depending on final scope, the project is anticipated to be constructed in a ± 4-month timeframe. It is also anticipated that access and staging areas will be available nearby. ➢ Note: All plans will be developed by FieldTurf in house licensed professionally engineering staff ➢ Site Civil Construction o Install sediment and erosion controls including construction entrance pad o Remove existing topsoil, irrigation, fencing and dugouts • Topsoil to be removed from site o Import / export general fill to meet proposed field grades o Cut and cap existing irrigation system • Install turf box with quick coupler connection o Furnish and install concrete turf anchor curbing o Furnish and install 6’ ht. Black vinyl chain link fencing o Furnish and install (2) 30’ ht. Tension netting backstop o Furnish and install (4)10’x40’ shade structure dugouts on concrete slab with fence surround for each field o Furnish and install storm drainage piping and flat panel drains as necessary o Furnish and install (2)2” empty conduits for future lighting needs and stub conduits to each dugout and batting cage o Installation of dynamic stone base layers and storm drainage overflow
Page 81
PROJECT PROPOSAL o Furnish and install concrete pads and walkways as shown o Furnish and install (2) batting cages with synthetic turf o Furnish and install bullpen areas per plan o Fine grade field in preparation of synthetic turf o Install finish materials and restore site to pre-construction conditions ➢ Synthetic Turf o Furnish and install synthetic turf for field o Synthetic turf with rubber and sand infill o Furnish and install FieldTurf ‘easy change’ home plate, batters boxes, and pitching rubbers for each field o Colors and field markings as shown on rendering o No logos or specialize lettering o Post installation gmax field testing ➢ Close Out o Supply maintenance training o Supply as-builts and close out package ALTERNATES: ➢ Alternate: New Scoreboard $96,500.00 o Furnish and install multi-use scoreboard o Assumed programmable boards with display/naming panel above board o Scoreboard (8’h x 25’w) ➢ Alternate: Portable Fencing $47,500.00 o Furnish And Assemble 350 l.f. Of 6’ ht. Portable fencing for synthetic turf o ‘Sporta-Fence’ with fence topper and wheel assembly for use in separating fields ➢ Alternate: LED Lighting System Infrastructure $143,750.00 o Furnish and install new led lighting system foundations • Assumed 8 pole lighting system o Furnish and install electrical boxes and stub conduits into boxes o (2) 2” electrical conduits to be provided within base scope of work ➢ Alternate: New LED Lighting Fixtures $578,065.00 o Assumes new power supply withing 100’ of field o Furnish And Install New Led Light System • Poles, Fixtures, Wiring, And Controls o Assumed 8 Pole System with standard soils and no rock drilling o Furnish And Supply Power To Each Dugout And Batting Cage Area
Page 82
PROJECT PROPOSAL
➢ Contingency
o A typical project of this type and scope we would suggest a contingency for design, general
conditions, and construction of 5% - 8%. This contingency would provide the School / Town level
of safety for unknown site conditions such as rock removal, unsuitable soils, etc.
EXCLUSIONS
➢ Any costs associated with necessary charges
relating to the delineation of the field
➢ The supply of manholes or clean-outs or grates,
or supply of the manhole covers outside of field
area
➢ Any alteration or deviation from specifications
involving extra costs, which alteration or
deviation will be provided only upon executed
change orders, and will become an extra charge
over and above the offered price
➢ Soil stabilization or remediation of any type
➢ Rock excavation or ledge removal
➢ Offsite disposal of generated spoils other than
topsoil
➢ Taxes
➢ Excavation or disposal of unsuitable or
contaminated soils
➢ Site security including security fencing
➢ Once subgrade has been established, a proof
roll will be performed to ensure structural
stability of the soils; in the event that unsuitable
soils are encountered, a price to remedy these
areas can be negotiated based on
recommended methods per project Engineer
➢ Testing or Inspection Fees
➢ Site restoration, sodding, landscaping or grow-
in beyond disturbed areas
➢ Repair or resurfacing existing asphalt parking
lot if damaged by truck traffic
➢ Bond fees and non-local permits
Please feel free to reach out to any member of our project team with questions about our offer:
Andrew Dyjak
Regional Vice President
(860) 333-7839
Andrew.Dyjak@Fieldturf.com
Chris Hulk
Regional Vice President
203-676-4445
christopher.hulk@fieldturf.com
Jonathan Luster, PE
Regional Construction Manager
(860) 227-4915
Jonathan.Luster@FieldTurf.com
Thank you again for your interest in FieldTurf, we look forward to working with you.
Per:
Marie-Christine Raymond, Director of Operations
FieldTurf USA, Inc. / Tarkett Sports Canada, Inc.
FieldTurf USA, Inc. holds the Cooperative Purchase contract, any PO for Contract must be made out to
FieldTurf USA, Inc. 175 N Industrial Blvd NE. Calhoun, GA 30701
If you have questions regarding the FieldTurf and Beynon SmartBuy Cooperative Purchasing Program,
please contact Eric Fisher at: Eric.Fisher@smartbuycooperative.com.
Page 83
PROJECT PROPOSAL a) This bid proposal and its acceptance is subject to strikes, accidents, delays beyond our control and force majeure. b) FieldTurf’s preferred payment terms are as follows: (i) 50% of the Price upon Customer’s execution of contract; (ii) 40% of the Price upon shipment of materials from FieldTurf’s manufacturing facility; and (iii) Remaining balance of ten percent (10%) upon substantial completion of the field, which shall be achieved when Customer is able to use the field for its intended purpose, even if punchlist items remain and the Certificate of Completion has not been executed by Customer. c) Accounts overdue beyond 30 days of invoice date will be charged at an interest rate of 10% per annum. d) FieldTurf requires a minimum of 21 days after receiving a fully executed contract or purchase order and final approvals on shop drawings to manufacture, coordinate delivery and schedule arrival of installation crew. Under typical field size and scenario, FieldTurf further requires a minimum of 28 days per field to install the Product subject to weather and force majeure e) FieldTurf requires a suitable staging area. Staging is anticipated in the last row of parking in the adjacent parking lot. minimum access of 15 feet wide by 15 feet high, and, no more than 100 ft from the site. A 25 foot wide by 25 foot long hard or paved clean surface area located within 50 feet of the playing surface shall be provided for purposes of proper CONDITIONS Notwithstanding any other document or agreement entered into by FieldTurf in connection with the supply and installation only of its product pursuant to the present bid proposal, the following shall apply: mixing of infill material. Access to any field will include suitable bridging over curbs from the staging area to permit suitable access to the field by low clearance vehicles. Staging area surface shall be suitable for passage with motor vehicles used to transport materials to the site and/or staging area. FieldTurf shall not be liable for any damages to the staging area or its surface unless such damages are caused by FieldTurf’s intentional misconduct or negligence. f) This proposal is based on a single mobilization. If the site is not ready and additional mobilizations are necessary, additional charges will apply. g) Upon substantial completion of FieldTurf’s obligations, the Customer shall sign FieldTurf’s Certificate of Completion in the form currently in force; to accomplish this purpose, the Customer will ensure that an authorized representative is present at the walk-through to determine substantial completion and acceptance of the field, which may include a list of punch list items. h) FieldTurf shall not be a party to any penalty clauses and/or liquidated damages provisions. i) FieldTurf shall be entitled to recover all costs and expenses, including attorney fees, associated with collection procedures in the event that FieldTurf pursues collection of payment of any past due invoice. j) All colors are to be chosen from FieldTurf’s standard colors. THE TARKETT SPORTS FAMILY - LEADERS IN SPORTS SURFACING 6/6
Page 84
3 1 2 5 4 c 50 SEATS c 3 1 2 5 4 c 50 SEATS c 3 1 2 5 4 c 50 SEATS c GRANBY MEMORIAL HIGH SCHOOL BASEBALL FACILITY IMPROVEMENTS PLEASANT STREET GRANBY, CONNECTICUTJANUARY 15, 2026 BASEBALL AND SOFTBALL Drawing: C:\USERS\T017224\ONEDRIVE - TARKETT\US09 - TEAM - ESTIMATING - DOCUMENTS\2024 BID ACTIVITY\CONNECTICUT\GRANBY\GRANBY HS CONCEPTS FINAL 2.DWG Layout Tab:BASEBALL (2)Plotted by: T017224 On this date: Thu, 2026 January 15 - 2:47pm 0'15'30' SCALE: 1"=30' 60' NOTES: 1)ALL DESIGN AND EXISTING CONDITIONS MAPPING BASED ON AVAILABLE MAPPING AND SHOULD BE CONSIDERED APPROXIMATE. 2)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA AND REQUIRES A CERTIFIED FIELDTURF INSTALLER AND BUILDER TO IMPLEMENT THE PROPOSED CONDITIONS. 3)FINAL LOCATIONS AND SIZES OF PROPOSED CONDITIONS ARE SUBJECT TO CHANGE. DUAL BULLPEN SYNTHETIC TURF FIELD ±140,000 S.F. BASEBALL 310' L, 330'R, 490' C SOCCER 330'x195' SOFTBALL: 210' RADIUS FOUL POLE INTEGRAL TO FENCE LINE DUAL BATTING CAGES FOR BOTH SOFTBALL AND BASEBALL GAME SHADE STRUCTURE DUGOUT WITH FENCE SURROUND ON CONCRETE PAD (TYPICAL) CONCRETE PAD AND ACCESS FOR PORTABLE BLEACHERS VISITING BULLPEN POTENTIAL BLEACHER PAD BACKSTOP WITH TENSION NETTING AND WALL SYSTEM ATHLETIC FIELD LIGHTING (TYPICAL) IMPROVED FIELD ACCESS 30' HT. TENSION NETTING BACKSTOP PORTABLE FENCING FULLY PROGRAMMABLE SCOREBOARD BACKSTOP AND HOME PLATE LOGO PITCHING MOUNDEASY CHANGE MOUND HOME PLATEDUGOUT SHADE STRUCTURE FIELD EDGE AND BASESUBGRADE WITH COLLECTOR PIPE BATTING TUNNEL MEGA TUNNEL BATTING CAGE WITH POWER SUPPLY FOR PITCHING MACHINES CONCRETE TURF ANCHOR CURB WITH INTEGRAL FENCE POSTS. 8" STONE BASE WITH 2" TOPPING STONE AND 6" DYNAMIC STONE BASE. SIEVE AND LA ABRASION TESTING TO MEET FIELDTURF STANDARDS LASER GRADE AND PROOF ROLL SUBGRADE. PITCH TO COLLECTOR PIPE AT LOW POINT. INSTALL 8"-12" COLLECTOR PIPE AND OUTLET. ADJUSTABLE HOME PLATE SET IN CONCRETE PAN. REMOVABLE VELCRO BATTING AND CATCHERS BOXES. 3 REPLACEMENT KITS INCLUDED SHADE STRUCTURE DUGOUT ON CONCRETE BASE WITH FENCE SURROUND CONCRETE MOUND FOR STABILITY AND LONGEVITY FOR GAME MOUND FIELDTURF EASY CHANGE MOUND SYSTEM FOR GAME FIELD. REPLACEABLE SECTIONS OF MOUND SET IN CONCRETE PAN FOR EASE OF REPLACEMENT. 3 REPLACEMENT SETS INCLUDED ALL BACKSTOPS TO BE 30' HT. TENSION NETTING ABOVE 6' HT. HEAVY DUTY FENCING. 24' TALL NETTING ABOVE FENCE. AS MANUFACTURED BY SPORTSFIELD SPECIALTIES OR JAYPRO SPORTS EXAMPLE PROJECT EXAMPLE PROJECT EXAMPLE PROJECT EXAMPLE PROJECT FALL START FOR CONSTRUCTION FOR SYNTHETIC TURF BASEBALL FIELD WITH COMPLETION DURING WINTER MONTHS HIGH PROFILE SYNTHETIC TURF BASEBALL FIELD WITH ALTERNATING PANELS DOUBLE FIELD WITH OVERLAYS HIGH PROFILE SYNTHETIC TURF BASEBALL FIELD
Page 85
Granby Memorial High School Turf Track and Field Priority Funding for Turf Track and Field Replacement at Granby Memorial High School A top priority for funding is the replacement of the turf track and field at Granby Memorial High School. Originally installed in 2013, the track has been meticulously maintained and serves as a source of pride and enjoyment for both the school district and the greater Granby community. The track is a vital community asset, used daily by residents for walking, running, and athletic training. Granby students rely on the track and field for physical education, wellness, and recreation across three seasons each year. Additionally, Stadium Field is an essential facility that supports not only football but also boys’ and girls’ soccer, lacrosse, field hockey, and cheerleading. Beyond athletics, the field hosts major events such as the annual GMHS graduation ceremony, Bearcats football games, and community fundraisers, including the Alzheimer’s Walk. Urgent Need for Repairs In recent years, the track and field have faced significant structural challenges, including the formation of sinkholes. These issues have progressed to the point where track and field meets can no longer be hosted, and safety concerns have led to restrictions on community access. Turf fields generally have a lifespan of 8–10 years, which can be extended to 10–15 years under optimal conditions. However, as the GMHS field enters its 12th year, it has exceeded its expected lifespan, and due to unique environmental factors, a full replacement is both warranted and necessary. Cost and Remediation Efforts The estimated cost to replace the track and field, including the necessary remediation to address existing structural challenges, exceeds $2 million. In 2022, the geotechnical firm Haley Aldrich conducted subsurface testing, including seven 15-foot deep geoprobe test holes, to investigate the cause of recurring sinkholes and surface depressions. Their analysis revealed the
Page 86
presence of air pockets and poorly graded soil beneath the track area. In 2024, GZA Geotechnical Services
reviewed the initial findings, conducted a site visit, and confirmed the assessment.
Both firms concluded that organic materials, such as tree stumps left unexcavated during the original construction,
are decomposing over time, creating air pockets that cause the sand layers to sink and surface layers to depress.
Additionally, concerns were raised about significant levels of poorly graded sand and air pockets at depths ranging
from 1 to 10 feet in various locations.
To ensure long-term stability, experts recommend a comprehensive remediation process, including soil removal,
excavation, screening for organic materials, and multiple layers of soil compaction before reinstatement. Without
these corrective measures, the risk of additional sinkhole formations in the coming years remains high.
The following samples illustrate the existing subsurface conditions at GMHS, with each container representing
depths of up to 15 feet.
Unaffected Turf Field Granby Turf Field
Properly compacted soil (yellow) Uncompacted soil w/ pockets of debris and air
(yellow)
Properly compacted / installed base (yellow) Sinking levels of subsurface (blue)
Level base surface (blue) Sinking base level (white)
Level turf surface (green) Uneven, depressed, and sinking turf surface (red)
Page 87
PROJECT BUDGET
GRANBY MEMORIAL HIGH SCHOOL
TRACK & FIELD IMPROVEMENTS
Existing Conditions Aerial
Conceptual Layout
Date: October 2, 2025
Prepared For: Karl Gates - Athletic Director & Student Activities Coordinator
Prepared By: Andrew Dyjak – Regional Vice President, New England
Chris Hulk, PE – Regional Vice President, New England
Jonathan Luster, PE – Regional Construction Manager, New England
Address: Granby Memorial High School| 54 N Granby Rd, Granby, CT 06035
This budget proposal encompasses all facets of the project, with FieldTurf offering a comprehensive, turnkey solution
that includes design, project oversight, and construction. The budget is based on current site conditions, review meeting
with the school, and the planned construction period in spring/summer 2026.
FieldTurf USA, Inc. is pleased to present the following proposal. FieldTurf pricing is based on the Capital Region Education
Council (CREC) program. CREC is a member of The Association of Educational Purchasing Agencies (AEPA) program. The
AEPA is a purchasing co-op that provides member schools with pre-determined preferential pricing by approved vendors.
Since the product has already been bid at the national level, individual schools do not have to duplicate the formal bid
process. AEPA IFB #024-A.
Click on the following AEPA hyperlink for more information: AEPA IFB #24-A.
Below is a detailed cost breakdown for site construction, turf installation and overall implementation of the project.
Page 88
PROJECT BUDGET Project Description: The existing track and field at Granby Memorial High School is in need of significant remediation efforts from sinks holes that have developed along the track / field. Based on the original geotechnical information provided by the Town, it appears that organic material has decayed below the eastern side of the track / field. The depths of this material are present up to 10’ below existing grade. The Town then expanded the geotechnical investigation, to which the report indicated the entirety of the track and field area should be fully removed down to a depth of 5’ and the compacted back in lifts. With this understanding, FieldTurf has developed two options for reconstruction. Option 1: The first option would be to complete the work as outlined in the geotechnical report. This would include removal of all track surfacing, removal of all synthetic turf, removal of all curbing, removal of all utilities, removal of all foundations, removal of all fencing and all existing subbase materials down to a depth of 5’. It is assumed that a large portion of this material will need to be removed from the site and supplemented with clean fill or gravel. Once the site has been excavated to a depth of 5’ and in some indicated areas down to 10’, the reconstruction would start to occur. Materials would be installed in lifts and a third party geotechnical engineer would be hired by the Town to oversee and test the work. The existing electrical, audio, storm and any other utilities would be replaced. The concrete turf anchor curb and football goal posts would be reinstalled. All new fencing and paved access paths around the site would be reconstructed. Finally, a new synthetic track and field would be installed on the newly reconstructed site. Several unknowns remain, such as if shoring is required around the existing bleachers, buildings, scoreboard and light poles given the depths of excavation. It is also unclear to what extent the 10’ depth of excavation will be required. Field conditions may render the needed area to expand. Lastly, it is unknown is rock and ledge removal will be encountered to the depths that are shown. Rock removal and ledge removal is always an exclusion of any contract due to its unforeseen nature. The warranty for construction on this option would be a 1 year workmanship warranty, 8 year warranty on synthetic turf and 5 year warranty on track materials. With all of these considerations in mind, FieldTurf felt it was in the best interest of the Town to review a second option based on its ability to self-perform post-tension concrete tracks, fields, and courts. Option 2: This preferred option of FieldTurf would reconstruct the existing track and field area with post tension concrete. FieldTurf has completed both post tension tracks and post tension fields throughout the New England region and through out the country. This technology allows the majority of materials to stay in place and be spanned by the nature of how post tension concrete operates. Slabs of post tension concrete are designed to span areas of unsuitable soils, provide high strength and long lasting base for whatever the application may be. Many other types of construction use this technique for bridges, parking garage slabs, balconies, overhangs and other types of applications. The last major benefit is that FieldTurf, as part of Tarkett Sports, is able to provide a 25+ year warranty on the structural components of the installation. This means that the Town would be ensured to not be left in this type of situation again. The reconstruction efforts of this type of system would remove the track and field areas. Remove the top 4”-5” of materials, compact the existing subgrade, perform 20 augured holes in areas of known settlement, install flowable fill in those areas and then construct a new post tension concrete track and field. Improved drainage, ball netting and football goal posts would be installed. Fencing would be replaced and walkway areas around the track would be renovated to meet new grades. All surrounding site features including lights, bleachers, buildings, scoreboards can all remain in place without the need for additional shoring or replacement.
Page 89
PROJECT BUDGET Lastly, alternates have been included for site improvements such as LED lighting, press box, ball netting, etc… Depending on final Option and scope selected, the project is anticipated to be constructed in a ±4-12 month timeframe. It is also anticipated that access and staging areas will be available nearby. This budget is intended to assist the school in preparing for this project. Additional discussions, review and programming will be required to refine the scope and budget prior to construction. FIELD REMEDIATION OPTIONS: ➢ Option 1 – FULL RECONSTRUCTION TO A DEPTH OF 5’ OR MORE $9,370,000 - $11,080,000 • General Scope: Reconstruction of entire track and field area up to limit of existing pavement beyond the existing fence line o Remove and dispose of existing track surfacing o Remove and dispose of existing synthetic turf surfacing o Remove and dispose all existing utilities, including storm drainage, electrical, audio and any other encountered utilities o Mill and remove all existing pavement and base materials. Salvage processed aggregate base for reuse. o Excavate, remove and salvage existing field stone base o Remove and dispose of existing turf anchor curb and track drain within limits shown o Remove and salvage existing storm drainage piping and supplement as needed o Excavate and remove existing soils to a depth of approximately 5’ along the entirety of the facility and up 10’ in various areas to remove unsuitable soils o Provided shoring and safety measures around existing structures, such as light poles, bleachers, sheds, etc… o Town provided 3rd party field testing agency for full time inspection of installed materials o Furnish and install new subgrade materials, compact in lifts to geotechnical recommendations o Furnish and install geogrid support mesh in 2 layers o Install drainage piping o Furnish and install electrical conduits and electrical system o Furnish and install new ACO drain and concrete turf anchor curb o Reinstall construct track base with appropriate base materials o Pave new track system to a depth of 3.5” of pavement with virgin asphalt o Furnish and install new dynamic stone base for field system o Furnish and install new track surfacing and striping within limits shown o Furnish and install new synthetic turf within limits shown o Furnish and install new 4’ ht. chain link fencing o Furnish and install new paved access around field ➢ Synthetic Turf Installation • Remove and recycle existing synthetic turf carpet and infill • Furnish and install post tension concrete field base • Furnish and install synthetic turf for field • Synthetic turf with SBR rubber and sand infill
Page 90
PROJECT BUDGET • Colored end zone • Alternating turf panels • Post installation GMAX field testing ➢ End Zone Letters • “GRANBY” end zone lettering ➢ Midfield Logo • Midfield Grizzly Style Logo ➢ Track Base Reconstruction • Remove and dispose of existing rubberized track surface • Furnish and install post tension concrete track base o Match grades to existing perimeter trench drain which is to remain ➢ Track Surfacing BSS-300 • Supply and install Beynon BSS-300 polyurethane track surfacing o Base color: Beynon red • Perform track striping ➢ Colored Exchange Zones • (3) colored exchange zones ADDITIONAL SITE IMPROVEMENTS ➢ 20’ Height Ball Safety Netting $80,000 - $95,000 • Supply and install 20-foot-high ball safety netting in D-Zones, including foundations, sleeves, poles, netting, and hardware along the field end lines ➢ 10’ Height Ball Safety Netting $55,000 - $75,000 • Supply and install 10-foot-high ball safety netting in corners of field up to 20 yard line, including foundations, sleeves, poles, netting, and hardware along the field end lines ➢ Press Box $175,000 - $225,000 • Furnish and install new press box behind existing bleachers • Includes new foundation and support structure • ADA access lift listed as separate item if needed ➢ ADA Lift $95,000 - $125,000 • Furnish and install new ADA accessible lift to press box • Includes foundation and installation ➢ Retrofit of Existing Athletic Lighting $200,000 - $250,000
Page 91
PROJECT BUDGET • Remove and dispose of existing light fixtures and replace with LED fixtures • Poles to remain ➢ New Bleachers with Press Box $650,000 - $750,000 • Furnish and install new double sided bleachers to service both fields (+/- 400 seats) • Furnish and install press box between fields for use for both fields • Furnish and install concrete slab for bleachers • Provide power supply POTENTIAL TOTAL OF OPTION 1 w/ ALL ALTERANTES $ 10,625,000 - $ 12,600,000 EXCLUSIONS ➢ Any costs associated with necessary charges relating to the delineation of the field ➢ The supply of manholes or clean-outs or grates, or supply of the manhole covers ➢ Any alteration or deviation from specifications involving extra costs, which alteration or deviation will be provided only upon executed change orders, and will become an extra charge over and above the offered price ➢ Soil stabilization or remediation of any type beyond 5’ depth ➢ Rock excavation and/or ledge removal ➢ Offsite disposal of generated spoils Excavation or disposal of unsuitable or contaminated soils ➢ Site security ➢ Once subgrade has been established, a proof roll will be performed to ensure structural stability of the soils; in the event that unsuitable soils are encountered, a price to remedy these areas can be negotiated based on recommended methods per project Engineer ➢ 3rd party testing or Inspection Fees ➢ Site restoration, sodding, landscaping or grow-in beyond disturbed areas ➢ Repair or resurfacing existing asphalt parking lot if damaged by truck traffic
Page 92
PROJECT BUDGET ➢ Option 2 (FieldTurf Preferred Option) $5,150,000 - $5,500,000 • General Scope: Extensive Exploration and Solidify o GPS located major sink hole areas and record for future exploration use o Remove and dispose of existing track surfacing o Remove and dispose of existing synthetic turf surfacing o Full depth mill of existing track pavement and remove o Excavate, remove and salvage existing field stone base and processed aggregate track base as necessary o Remove and dispose of existing turf anchor curb around track and field o Remove and replace football goal posts o Remove and replace damaged sections of drainage piping o Remove and dispose of existing electrical conduit and wiring if encountered during exploration o Replace and/or reset electrical boxes and drainage structures within field o Conduct a series of 10’ deep x 2’ diameter augur holes along eastern side of track / field o Remove and dispose of excavated material o Install flowable fill in all excavated holes to a depth of approximately 1’ below finished grade o Furnish and install geogrid support mesh prior to backfill o Furnish and install new subgrade materials to achieve new grades o Reinstall drainage piping and electrical conduits as necessary o Furnish and install new ACO drain and concrete turf anchor curb as required o Furnish and install new post tension concrete track and field o Furnish and install new 4’ ht. chain link fencing and gates o Furnish and install new access path around field o Furnish and install new track surfacing and striping within limits shown o Furnish and install new synthetic turf and shock/drainage pad within limits shown o Provide 25+ year structural warranty on all post tension concrete ➢ Synthetic Turf Installation • Remove and recycle existing synthetic turf carpet and infill • Furnish and install post tension concrete field base • Furnish and install shock / drainage pad • Furnish and install synthetic turf for field • Synthetic turf with SBR rubber and sand infill • Colored end zone • Alternating turf panels • Post installation GMAX field testing • Annual field maintenance. 1 visit per year for 8 years ➢ End Zone Letters • “GRANBY” end zone lettering ➢ Midfield Logo • Midfield Grizzly Style Logo
Page 93
PROJECT BUDGET
➢ Track Base Reconstruction
• Remove and dispose of existing rubberized track surface
• Furnish and install post tension concrete track base
o Match grades to existing perimeter trench drain which is to remain
➢ Track Surfacing BSS-300
• Supply and install Beynon BSS-300 polyurethane track surfacing
o Base color: Beynon red
• Perform track striping
➢ Colored Exchange Zones
• (3) colored exchange zones
ADDITIONAL SITE IMPROVEMENTS
➢ 20’ Height Ball Safety Netting $80,000 - $95,000
• Supply and install 20-foot-high ball safety netting in D-Zones, including foundations,
sleeves, poles, netting, and hardware along the field end lines
➢ 10’ Height Ball Safety Netting $55,000 - $75,000
• Supply and install 10-foot-high ball safety netting in corners of field up to 20 yard line,
including foundations, sleeves, poles, netting, and hardware along the field end lines
➢ Press Box $175,000 - $225,000
• Furnish and install new press box behind existing bleachers
• Includes new foundation and support structure
• ADA access lift listed as separate item if needed
➢ ADA Lift $95,000 - $125,000
• Furnish and install new ADA accessible lift to press box
• Includes foundation and installation
➢ Retrofit of Existing Athletic Lighting $200,000 - $250,000
• Remove and dispose of existing light fixtures and replace with LED fixtures
• Poles to remain
➢ New Bleachers with Press Box $650,000 - $750,000
• Furnish and install new double sided bleachers to service both fields (+/- 400 seats)
• Furnish and install press box between fields for use for both fields
• Furnish and install concrete slab for bleachers
• Provide power supply
POTENTIAL TOTAL OF OPTION 1 w/ ALL ALTERANTES $ 6,475,000 - $ 7,100,000
Page 94
PROJECT BUDGET EXCLUSIONS ➢ Any costs associated with necessary charges relating to the delineation of the field ➢ The supply of manholes or clean-outs or grates, or supply of the manhole covers ➢ Any alteration or deviation from specifications involving extra costs, which alteration or deviation will be provided only upon executed change orders, and will become an extra charge over and above the offered price ➢ Soil stabilization or remediation of any type ➢ Mass Excavation as required to achieve subgrade ➢ Rock excavation ➢ Offsite disposal of generated spoils ➢ Excavation or disposal of unsuitable or contaminated soils ➢ Site security ➢ Once subgrade has been established, a proof roll will be performed to ensure structural stability of the soils; in the event that unsuitable soils are encountered, a price to remedy these areas can be negotiated based on recommended methods per project Engineer ➢ Testing or Inspection Fees ➢ Site restoration, sodding, landscaping or grow- in beyond disturbed areas ➢ Repair or resurfacing existing asphalt parking lot if damaged by truck traffic ➢ Bond fees and non-local permits Please feel free to reach out to any member of our project team with questions about our offer: Andrew Dyjak Regional Vice President (860) 333-7839 Andrew.Dyjak@Fieldturf.com Chris Hulk Regional Vice President 203-676-4445 christopher.hulk@fieldturf.com Jonathan Luster, PE Regional Construction Manager (860) 227-4915 Jonathan.Luster@FieldTurf.com
Page 95
PROJECT PROPOSAL
GRANBY FIELD RENOVATIONS Nov. 24, 2025
Prepared For: Christopher DeGray, Director of Facilities – Granby Public Schools
Prepared By: Andrew Dyjak – Regional Vice President, New England
Chris Hulk, PE – Regional Vice President, New England
Address: Granby Memorial High School| 54 N Granby Rd, Granby, CT 06035
PRICING SUMMARY
Pricing has been provided as a summary of the full proposals. Pricing listed excludes alternates. Please see
full proposals for additional pricing items.
BASE BID
FIELD NAME Granby High School Track and Field
SQUARE FOOTAGE +/- 93,500 s.f.
PRODUCT FieldTurf Vertex Prime
FIELD MARKINGS Football, Soccer, Lacrosse and Field Hockey
TOTAL PRICE $ 5,348,500.00
BASE BID
FIELD NAME Granby High School Field 2
SQUARE FOOTAGE +/- 83,000 s.f.
PRODUCT FieldTurf Vertex Prime
FIELD MARKINGS Soccer, Lacrosse and Field Hockey
TOTAL PRICE $ 665,750.00
MULTI-FIELD DISCOUNT
FIELD NAME Granby High School
Credit is both fields completed concurrently ($ 125,000.00)
COMBINED PROJECTS BASE BID (Excludes Alternates)
FIELD NAME Granby High School Track, Field and Field 2 Combined
SQUARE FOOTAGE +/- 176,500 SF
TOTAL PRICE $ 5,889,250.00 Page 96
PROJECT PROPOSAL
GRANBY MEMORIAL HIGH SCHOOL
TRACK & FIELD IMPROVEMENTS
Existing Conditions Aerial
Conceptual Layout
Date: November 26, 2025
Prepared For: Christopher DeGray, Director of Facilities – Granby Public Schools
Prepared By: Andrew Dyjak – Regional Vice President, New England
Chris Hulk, PE – Regional Vice President, New England
Jonathan Luster, PE – Regional Construction Manager, New England
Address: Granby Memorial High School| 54 N Granby Rd, Granby, CT 06035
This proposal encompasses all facets of the project, with FieldTurf offering a comprehensive, turnkey solution that
includes design, project oversight, and construction. The proposal is based on current site conditions, review meeting
with the school, and the planned construction period in spring/summer 2026.
FieldTurf USA, Inc. is pleased to present the following proposal. FieldTurf pricing is based on the Capital Region Education
Council (CREC) program. CREC is a member of The Association of Educational Purchasing Agencies (AEPA) program. The
AEPA is a purchasing co-op that provides member schools with pre-determined preferential pricing by approved vendors.
Since the product has already been bid at the national level, individual schools do not have to duplicate the formal bid
process. AEPA IFB #024-A.
Click on the following AEPA hyperlink for more information: AEPA IFB #24-A.
Below is a detailed cost breakdown for site construction, turf installation and overall implementation of the project.
Page 97
PROJECT PROPOSAL
BASE BID
FIELD NAME Granby High School Track and Field
SQUARE FOOTAGE +/- 93,500 s.f.
PRODUCT FieldTurf Vertex Prime
FIELD MARKINGS Football, Soccer, Lacrosse and Field Hockey
TOTAL PRICE $ 5,348,500.00
Project Description:
The existing track and field at Granby Memorial High School is in need of significant remediation due to sinks holes that
have developed along the track / field. Based on the original geotechnical information provided by the Town, it appears
that organic material has decayed below the eastern side of the track / field. The depths of this material are present up
to 10’ below existing grade. The Town then expanded the geotechnical investigation. The new report indicated the
entirety of the track and field area should be fully removed down to a depth of 5’ and the compacted back in lifts. The
cost for reconstruction in the manner indicated by the geotechnical report was well beyond the available funds. This led
to the option of post tension concrete track and field that FieldTurf is proposing.
FieldTurf proposes to reconstruct the existing track and field areas with post tension concrete. FieldTurf has completed
both post tension tracks and post tension fields throughout the New England region and through out the country. This
technology allows the majority of materials to stay in place and be bridged by the nature of how post tension concrete
operates. Slabs of post tension concrete are designed to span areas of unsuitable soils, provide high strength and long
lasting base for the application. Many other types of construction use this technique for bridges, parking garage slabs,
balconies, overhangs and other types of applications. Another major benefit is that FieldTurf, as part of Tarkett Sports, is
able to provide a 25+ year warranty on the structural components of the installation. This means that the Town would
be assured of the performance and stability of the track and field. The reconstruction efforts of this type of system
would remove the track and field areas. Remove the top 4”-5” of materials, compact the existing subgrade, perform 20-
30 augured holes in areas of known settlement, install flowable fill in those areas and then construct a new post tension
concrete track and field. Improved drainage, ball netting sleeves and football goal posts would be installed. Fencing
would be replaced and walkway areas around the track would be renovated to meet new grades. All surrounding site
features including lights, bleachers, buildings, scoreboards can all remain in place without the need for additional
shoring or replacement.
Alternates have been included for site improvements such as LED lighting renovation, press box, ball netting, etc.
Depending on final scope options, the project is anticipated to be constructed in a ±4-5 month timeframe. It is also
anticipated that access and staging areas will be available in the adjacent parking lot. Additional discussions, review and
programming will be required to finalize the scope, timing and alternates prior to construction.
Page 98
PROJECT PROPOSAL TRACK AND FIELD RENVOATION IMPROVEMENTS • General Scope: Post Tension concrete track and field o GPS located major sink hole areas and record for future exploration use o Remove and dispose of existing track surfacing o Remove and dispose of existing synthetic turf surfacing o Full depth mill of existing track pavement and remove o Excavate, remove and salvage existing field stone base and processed aggregate track base as necessary o Remove and dispose of existing turf anchor curb around track and field o Remove and replace football goal posts o Remove and replace damaged sections of drainage piping o Remove and dispose of existing electrical conduit and wiring if encountered during exploration o Replace and/or reset electrical boxes and drainage structures within field o Conduct a series of 10’ deep x 18” diameter augur holes along eastern side of track / field o Remove and dispose of excavated material o Install flowable fill in all excavated holes to a depth of approximately 1’ below finished grade o Furnish and install geogrid support mesh prior to backfill o Furnish and install new subgrade materials to achieve new grades o Reinstall drainage piping and electrical conduits as necessary o Furnish and install new ACO drain and concrete turf anchor curb as required o Furnish and install new post tension concrete track and field o Furnish and install new 4’ ht. chain link fencing and gates o Furnish and install new access path around field o Furnish and install new track surfacing and striping within limits shown o Furnish and install new synthetic turf and shock/drainage pad within limits shown o Provide 25+ year structural warranty on all post tension concrete ➢ Synthetic Turf Installation • Remove and recycle existing synthetic turf carpet and infill • Furnish and install post tension concrete field base • Furnish and install shock / drainage pad • Furnish and install synthetic turf for field • Synthetic turf with SBR rubber and sand infill • Colored end zone • Alternating turf panels • Post installation GMAX field testing • Annual field maintenance. 1 visit per year for 8 years ➢ End Zone Letters • “GRANBY” end zone lettering ➢ Midfield Logo • Midfield Grizzly Style Logo
Page 99
PROJECT PROPOSAL ➢ Track Base Reconstruction • Remove and dispose of existing rubberized track surface • Furnish and install post tension concrete track base o Match grades to existing perimeter trench drain which is to remain ➢ Track Surfacing BSS-300 • Supply and install Beynon BSS-300 polyurethane track surfacing o Base color: Beynon red o (3) Colored exchange zones. Color: Gray • Perform track striping ALTERNATES: ➢ Performance and Payment Bonds $67,000.00 • Supply performance and payment bonds ➢ 20’ Height Ball Safety Netting $81,000.00 • Supply and install 20-foot-high ball safety netting in D-Zones, including foundations, sleeves, poles, netting, and hardware along the field end lines ➢ 10’ Height Ball Safety Netting $65,000.00 • Supply and install 10-foot-high ball safety netting in corners of field up to 20 yard line, including foundations, sleeves, poles, netting, and hardware along the field end lines ➢ Press Box $215,000.00 • Furnish and install new press box behind existing bleachers • Includes new foundation and support structure • ADA access lift listed as separate item if needed ➢ ADA Lift $85,000.00 • Furnish and install new ADA accessible lift to press box • Includes foundation and installation • Required if press box is more than 500 s.f. or has two points of entry ➢ Retrofit of Existing Athletic Lighting $255,000.00 • Remove and dispose of existing light fixtures and replace with LED fixtures • Assumed 40 fc system • Poles to remain ➢ New Bleachers with Press Box $715,000.00 • Furnish and install new double sided bleachers to service both fields (+/- 400 seats) • Furnish and install press box between fields for use for both fields • Furnish and install concrete slab for bleachers • Provide power supply
Page 100
PROJECT PROPOSAL
EXCLUSIONS
➢ Any costs associated with necessary charges
relating to the delineation of the field
➢ The supply of manholes or clean-outs or grates,
or supply of the manhole covers
➢ Any alteration or deviation from specifications
involving extra costs, which alteration or
deviation will be provided only upon executed
change orders, and will become an extra charge
over and above the offered price
➢ Soil stabilization or remediation of any type
➢ Mass Excavation as required to achieve
subgrade
➢ Rock excavation
➢ Offsite disposal of generated spoils
➢ Excavation or disposal of unsuitable or
contaminated soils
➢ Site security
➢ Once subgrade has been established, a proof
roll will be performed to ensure structural
stability of the soils; in the event that unsuitable
soils are encountered, a price to remedy these
areas can be negotiated based on
recommended methods per project Engineer
➢ Testing or Inspection Fees
➢ Site restoration, sodding, landscaping or grow-
in beyond disturbed areas
➢ Repair or resurfacing existing asphalt parking
lot if damaged by truck traffic
➢ Bond fees and non-local permits
Please feel free to reach out to any member of our project team with questions about our offer:
Andrew Dyjak
Regional Vice President
(860) 333-7839
Andrew.Dyjak@Fieldturf.com
Chris Hulk
Regional Vice President
203-676-4445
christopher.hulk@fieldturf.com
Jonathan Luster, PE
Regional Construction Manager
(860) 227-4915
Jonathan.Luster@FieldTurf.com
Thank you again for your interest in FieldTurf, we look forward to working with you.
Per:
Marie-Christine Raymond, Director of Operations
FieldTurf USA, Inc. / Tarkett Sports Canada, Inc.
FieldTurf USA, Inc. holds the Cooperative Purchase contract, any PO for Contract must be made out to
FieldTurf USA, Inc. 175 N Industrial Blvd NE. Calhoun, GA 30701
If you have questions regarding the FieldTurf and Beynon SmartBuy Cooperative Purchasing Program,
please contact Eric Fisher at: Eric.Fisher@smartbuycooperative.com.
Page 101
PROJECT PROPOSAL a) This bid proposal and its acceptance is subject to strikes, accidents, delays beyond our control and force majeure. b) FieldTurf’s preferred payment terms are as follows: (i) 50% of the Price upon Customer’s execution of contract; (ii) 40% of the Price upon shipment of materials from FieldTurf’s manufacturing facility; and (iii) Remaining balance of ten percent (10%) upon substantial completion of the field, which shall be achieved when Customer is able to use the field for its intended purpose, even if punchlist items remain and the Certificate of Completion has not been executed by Customer. c) Accounts overdue beyond 30 days of invoice date will be charged at an interest rate of 10% per annum. d) FieldTurf requires a minimum of 21 days after receiving a fully executed contract or purchase order and final approvals on shop drawings to manufacture, coordinate delivery and schedule arrival of installation crew. Under typical field size and scenario, FieldTurf further requires a minimum of 28 days per field to install the Product subject to weather and force majeure e) FieldTurf requires a suitable staging area. Staging is anticipated in the last row of parking in the adjacent parking lot. minimum access of 15 feet wide by 15 feet high, and, no more than 100 ft from the site. A 25 foot wide by 25 foot long hard or paved clean surface area located within 50 feet of the playing surface shall be provided for purposes of proper CONDITIONS Notwithstanding any other document or agreement entered into by FieldTurf in connection with the supply and installation only of its product pursuant to the present bid proposal, the following shall apply: mixing of infill material. Access to any field will include suitable bridging over curbs from the staging area to permit suitable access to the field by low clearance vehicles. Staging area surface shall be suitable for passage with motor vehicles used to transport materials to the site and/or staging area. FieldTurf shall not be liable for any damages to the staging area or its surface unless such damages are caused by FieldTurf’s intentional misconduct or negligence. f) This proposal is based on a single mobilization. If the site is not ready and additional mobilizations are necessary, additional charges will apply. g) Upon substantial completion of FieldTurf’s obligations, the Customer shall sign FieldTurf’s Certificate of Completion in the form currently in force; to accomplish this purpose, the Customer will ensure that an authorized representative is present at the walk-through to determine substantial completion and acceptance of the field, which may include a list of punch list items. h) FieldTurf shall not be a party to any penalty clauses and/or liquidated damages provisions. i) FieldTurf shall be entitled to recover all costs and expenses, including attorney fees, associated with collection procedures in the event that FieldTurf pursues collection of payment of any past due invoice. j) All colors are to be chosen from FieldTurf’s standard colors. THE TARKETT SPORTS FAMILY - LEADERS IN SPORTS SURFACING 6/6
Page 102
G R A N B Y G R A N B Y 0'15'60' SCALE: 1"=30'' 30' GRANBY MEMORIAL HIGH SCHOOL TRACK & FIELD 39 SCHOOL STREET GRANBY, CONNECTICUTACHUSETTSAPRIL 15, 2025 TRACK & FIELD Drawing: C:\USERS\T017224\ONEDRIVE - TARKETT\US09 - TEAM - ESTIMATING - DOCUMENTS\2024 BID ACTIVITY\CONNECTICUT\GRANBY\GRANBY HS CONCEPTS FINAL.DWG Layout Tab:TRACKPlotted by: T017224 On this date: Wed, 2025 November 26 - 2:12pm ALTERNATE: FURNISH AND INSTALL NEW PRESS BOX AND LIFT POST TENSION CONCRETE TRACK AND FIELD NOTES: 1)ALL DESIGN AND EXISTING CONDITIONS MAPPING BASED ON AVAILABLE MAPPING AND SHOULD BE CONSIDERED APPROXIMATE. 2)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA AND REQUIRES A CERTIFIED FIELDTURF INSTALLER AND BUILDER TO IMPLEMENT THE PROPOSED CONDITIONS. 3)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA AND NO ATTEMPTS SHALL BE MADE TO DUPLICATE OR REPLICATE WITHOUT THE PREMISSION OF FIELDTURF. ALTERNATE: FULLY PROGRAMMABLE SCOREBOARD NEW GATES AT KEY LOCATIONS REMOVE AND REPLACE TRACK SURFACING WITH BSS-300 WITH GRAY EXCHANGE ZONES REMOVE AND REPLACE SYNTHETIC TURF ALTERNATE: DUAL SIDED BLEACHERS WITH PRESS BOX ALTERNATE: RETROFIT EXISTING LIGHTING SYSTEM TO BE LED ALTERNATE: 20' BALL SAFETY NETTING SYSTEM ALTERNATE: 10' BALL SAFETY NETTING SYSTEM ALONG CORNERS
Page 103
PROJECT PROPOSAL
GRANBY MEMORIAL HIGH SCHOOL
FIELD 2 IMPROVEMENTS
Existing Conditions Aerial
Conceptual Layout
Date: November 25, 2025
Prepared For: Christopher DeGray, Director of Facilities – Granby Public Schools
Prepared By: Andrew Dyjak – Regional Vice President, New England
Chris Hulk, PE – Regional Vice President, New England
Jonathan Luster, PE – Regional Construction Manager, New England
Address: Granby Memorial High School| 54 N Granby Rd, Granby, CT 06035
This project proposal encompasses all facets of the project, with FieldTurf offering a comprehensive, turnkey solution
that includes design, project oversight, and construction. The project is based on current site conditions, review meeting
with the school, and the planned construction period in spring/summer 2026.
FieldTurf pricing is based on the Capital Region Education Council (CREC) program. CREC is a member of The Association
of Educational Purchasing Agencies (AEPA) program. The AEPA is a purchasing co-op that provides member schools with
pre-determined preferential pricing by approved vendors. Since the product has already been bid at the national level,
individual schools do not have to duplicate the formal bid process. AEPA IFB #024-A.
Click on the following AEPA hyperlink for more information: AEPA IFB #24-A.
Below is a detailed cost breakdown for site construction, turf installation and overall implementation of the project.
Page 104
PROJECT PROPOSAL BASE BID FIELD NAME Granby High School Field 2 SQUARE FOOTAGE +/- 83,000 s.f. PRODUCT FieldTurf Vertex Prime FIELD MARKINGS Soccer, Lacrosse and Field Hockey TOTAL PRICE $ 665,750.00 Project Description: The project proposes to replace the existing synthetic turf carpet with new synthetic turf. The existing turf will be cut into sections, rolled up, and removed from the field. The existing infill will BE removed from the field and brought to a recycling facility. The field will then be laser graded to achieve planarity before the new turf is laid down and installed on the field. If additional topping stone is needed to achieve planarity, more stone will be brought in. Various alternates have been included for considerations such as center logo, new LED lighting pole and fixtures, ball safety netting, and walkways have been added to the project below as well. Depending on final scope, the project is anticipated to be constructed in a ±2-3 month timeframe. It is also anticipated that access and staging areas will be available nearby. This project is intended to assist the school in preparing for this project. Additional discussions, review and programming will be required to refine the scope and project prior to construction. SYNTHETIC TURF IMPROVEMENTS ➢ Synthetic Turf Installation • Remove And Recycle Existing Synthetic Turf Carpet And Infill • Laser Grade Base Stone And Supplement Base Stone As Needed In Order To Achieve Planarity Prior To Turf Installation • Furnish And Install Synthetic Turf For Field • Synthetic Turf With SBR Rubber And Sand Infill • Colors And Logos Per Rendering • Post Installation GMAX Field Testing
Page 105
PROJECT PROPOSAL ALTERNATES: ➢ Alternate: Performance and Payment Bonds $8,300.00 o Supply performance and payment bonds ➢ Alternate: Midfield Logo $15,000.00 o Midfield “Grizzly” style Bear logo ➢ Alternate: Improved Ball Netting $78,000.00 o Remove Existing Ball Netting o Furnish And Install New Ball Netting o Final Size And Location T.B.D. ➢ Alternate: New Scoreboard $85,000.00 o Furnish And Install Multi-Use Scoreboard o Assumed Programmable Boards with Display/Naming Panel Above Board o Scoreboard (8’h X 25’w) ➢ Alternate 5: New Led Lighting Fixtures $525,500.00 o Furnish And Install New Led Light Fixtures On Existing Poles o Assumed 4 Pole System o New Power Supply Within 100’ Of Field EXCLUSIONS ➢ Any costs associated with necessary charges relating to the delineation of the field ➢ The supply of manholes or clean-outs or grates, or supply of the manhole covers ➢ Any alteration or deviation from specifications involving extra costs, which alteration or deviation will be provided only upon executed change orders, and will become an extra charge over and above the offered price ➢ Soil stabilization or remediation of any type ➢ Mass Excavation as required to achieve subgrade ➢ Rock excavation ➢ Offsite disposal of generated spoils ➢ Excavation or disposal of unsuitable or contaminated soils ➢ Site security ➢ Once subgrade has been established, a proof roll will be performed to ensure structural stability of the soils; in the event that unsuitable soils are encountered, a price to remedy these areas can be negotiated based on recommended methods per project Engineer ➢ Testing or Inspection Fees ➢ Site restoration, sodding, landscaping or grow- in beyond disturbed areas ➢ Repair or resurfacing existing asphalt parking lot if damaged by truck traffic ➢ Bond fees and non-local permits Please feel free to reach out to any member of our project team with questions about our offer: Andrew Dyjak Regional Vice President (860) 333-7839 Andrew.Dyjak@Fieldturf.com Chris Hulk Regional Vice President 203-676-4445 christopher.hulk@fieldturf.com Jonathan Luster, PE Regional Construction Manager (860) 227-4915 Jonathan.Luster@FieldTurf.com
Page 106
PROJECT PROPOSAL
Thank you again for your interest in FieldTurf, we look forward to working with you.
Per:
Marie-Christine Raymond, Director of Operations
FieldTurf USA, Inc. / Tarkett Sports Canada, Inc.
FieldTurf USA, Inc. holds the Cooperative Purchase contract, any PO for Contract must be made out to
FieldTurf USA, Inc. 175 N Industrial Blvd NE. Calhoun, GA 30701
If you have questions regarding the FieldTurf and Beynon SmartBuy Cooperative Purchasing Program,
please contact Eric Fisher at: Eric.Fisher@smartbuycooperative.com.
Page 107
PROJECT PROPOSAL a) This bid proposal and its acceptance is subject to strikes, accidents, delays beyond our control and force majeure. b) FieldTurf’s preferred payment terms are as follows: (i) 50% of the Price upon Customer’s execution of contract; (ii) 40% of the Price upon shipment of materials from FieldTurf’s manufacturing facility; and (iii) Remaining balance of ten percent (10%) upon substantial completion of the field, which shall be achieved when Customer is able to use the field for its intended purpose, even if punchlist items remain and the Certificate of Completion has not been executed by Customer. c) Accounts overdue beyond 30 days of invoice date will be charged at an interest rate of 10% per annum. d) FieldTurf requires a minimum of 21 days after receiving a fully executed contract or purchase order and final approvals on shop drawings to manufacture, coordinate delivery and schedule arrival of installation crew. Under typical field size and scenario, FieldTurf further requires a minimum of 28 days per field to install the Product subject to weather and force majeure e) FieldTurf requires a suitable staging area. Staging is anticipated in the last row of parking in the adjacent parking lot. minimum access of 15 feet wide by 15 feet high, and, no more than 100 ft from the site. A 25 foot wide by 25 foot long hard or paved clean surface area located within 50 feet of the playing surface shall be provided for purposes of proper CONDITIONS Notwithstanding any other document or agreement entered into by FieldTurf in connection with the supply and installation only of its product pursuant to the present bid proposal, the following shall apply: mixing of infill material. Access to any field will include suitable bridging over curbs from the staging area to permit suitable access to the field by low clearance vehicles. Staging area surface shall be suitable for passage with motor vehicles used to transport materials to the site and/or staging area. FieldTurf shall not be liable for any damages to the staging area or its surface unless such damages are caused by FieldTurf’s intentional misconduct or negligence. f) This proposal is based on a single mobilization. If the site is not ready and additional mobilizations are necessary, additional charges will apply. g) Upon substantial completion of FieldTurf’s obligations, the Customer shall sign FieldTurf’s Certificate of Completion in the form currently in force; to accomplish this purpose, the Customer will ensure that an authorized representative is present at the walk-through to determine substantial completion and acceptance of the field, which may include a list of punch list items. h) FieldTurf shall not be a party to any penalty clauses and/or liquidated damages provisions. i) FieldTurf shall be entitled to recover all costs and expenses, including attorney fees, associated with collection procedures in the event that FieldTurf pursues collection of payment of any past due invoice. j) All colors are to be chosen from FieldTurf’s standard colors. THE TARKETT SPORTS FAMILY - LEADERS IN SPORTS SURFACING 6/6
Page 108
0'10'20' SCALE: 1"=20' 40' GRANBY MEMORIAL HIGH SCHOOL FIELD 2 39 SCHOOL STREET GRANBY, CONNECTICUTACHUSETTSAPRIL 15, 2025 FIELD 2 Drawing: C:\USERS\T017224\ONEDRIVE - TARKETT\US09 - TEAM - ESTIMATING - DOCUMENTS\2024 BID ACTIVITY\CONNECTICUT\GRANBY\GRANBY HS CONCEPTS FINAL.DWG Layout Tab:FIELD 2Plotted by: T017224 On this date: Wed, 2025 November 26 - 2:08pm NOTES: 1)ALL DESIGN AND EXISTING CONDITIONS MAPPING BASED ON AVAILABLE MAPPING AND SHOULD BE CONSIDERED APPROXIMATE. 2)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA AND REQUIRES A CERTIFIED FIELDTURF INSTALLER AND BUILDER TO IMPLEMENT THE PROPOSED CONDITIONS. 3)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA AND NO ATTEMPTS SHALL BE MADE TO DUPLICATE OR REPLICATE WITHOUT THE PREMISSION OF FIELDTURF. ALTERNATE: FULLY PROGRAMMABLE SCOREBOARD REMOVE AND REPLACE SYNTHETIC TURF ALTERNATE: DUAL SIDED BLEACHERS WITH PRESS BOX ALTERNATE: NEW LED FIELD LIGHTING SYSTEM ALTERNATE: BALL SAFETY NETTING SYSTEM ALTERNATE: IMPROVED FIELD ACCESS
Page 109
PROJECT BUDGET
GRANBY MEMORIAL HIGH SCHOOL
ATHLETIC FACILITY IMPROVEMENTS
Date: April 21, 2025
Prepared For: Karl Gates - Athletic Director & Student Activities Coordinator
Prepared By: Andrew Dyjak – Regional Vice President, New England
Chris Hulk, PE – Regional Vice President, New England
Jonathan Luster, PE – Regional Construction Manager, New England
Address: Granby Memorial High School| 54 N Granby Rd, Granby, CT 06035
FieldTurf pricing is based on the Capital Region Education Council (CREC) program. CREC is a member of The Association
of Educational Purchasing Agencies (AEPA) program. The AEPA is a purchasing co-op that provides member schools with
pre-determined preferential pricing by approved vendors. Since the product has already been bid at the national level,
individual schools do not have to duplicate the formal bid process. AEPA IFB #024.
Click on the following AEPA hyperlink for more information: AEPA IFB #24
Master Review Approach:
FieldTurf has reviewed each site on the campus with School and Town staff to review both existing conditions and future
development desires. Through this process FieldTurf has become familiar with the needs and wants of the School to best
serve the School and Town moving forward. The recommendations that are proposed below are based on hundreds of
Connecticut installations, the design build approach that has become the preferred procurement method of many
municipalities in the New England area and by in house professional engineering staff design.
A conceptual layout plan has been developed for each site with associated budgets. These budgets are subject to change
and be altered upon further refinement of scope between FieldTurf and the School/Town. FieldTurf will help develop
the final scope of the project, then develop professionally engineered plans tailored to each site and finally assist the
School/Town with obtaining permits.
FieldTurf is part of Tarkett Sports and has become the industry leader in synthetic turf, design build and athletic facility
development. Through Tarkett Sports we have in house post tension concrete court division, synthetic track divisions,
synthetic turf divisions, long term care divisions and partnerships with various lighting companies. All of these have
helped to develop the attached scopes and budgets.
Page 110
PROJECT BUDGET Overview Pricing: Below are suggested project scope items for each site. Full break down has been included in individual budgets and may contain additional options for consideration. - Track and Field o Option 2 Reconstruction $ 600,000 - $750,000 o Synthetic Turf Replacement $ 675,000 - $750,000 o Synthetic Track Renovation $ 755,000 - $940,000 o Ball Netting $ 135,000 - $170,000 o New Bleachers with Press Box $ 650,000 - $ 750,000 ➢ Suggested Budget $2,815,000 - $3,360,000 - Baseball / Softball Field o Field Reconstruction $ 2,850,000 - $3,450,000 o New Scoreboard $ 90,000 - $ 125,000 o Athletic Field Lighting $ 675,000 - $ 750,000 ➢ Suggested Budget $3,615,000 - $4,325,000 - Tennis Courts o Post Tension Concrete Courts $ 1,200,000 - $ 1,300,000 o Walkways and Plantings $115,000 - $150,000 ➢ Suggested Budget $1,315,000 - $1,450,000 - Field 2 o Turf Replacement $ 650,000 - $ 700,000 o Improved Ball Netting $ 45,000 - $ 85,000 o New Scoreboard $65,000 - $ 95,000 ➢ Suggested Budget $ 760,000 - $ 880,000 - Suggested Referendum Proposal: $8,505,000 - $10,015,000 o The suggested referendum proposal is provided as an overall budget for the Town to procure funds for the overall project to be completed. FieldTurf will work with the Town to develop the final scope of the project to allow a firm price and project prior to development of a referendum. It is likely that the provided budget numbers will be revised after additional scope refinement.
Page 111
G R A N B Y G R A N B Y 3 1 2 5 4 c 50 SEATS c 3 1 2 5 4 c 50 SEATS c 3 12 5 4 c 50 SEATS c 0'40'160' SCALE: 1"=80' 80' GRANBY MEMORIAL HIGH SCHOOL ATHLETIC FACILITIES 39 SCHOOL STREET GRANBY, CONNECTICUTACHUSETTSAPRIL 15, 2025 FULL SITE Drawing: P:\ESTIMATING\2024 BID ACTIVITY\CONNECTICUT\GRANBY\GRANBY HS CONCEPTS FINAL.DWG Layout Tab:FULL SITEPlotted by: T017224 On this date: Fri, 2025 April 18 - 10:40am NOTES: 1)ALL DESIGN AND EXISTING CONDITIONS MAPPING BASED ON AVAILABLE MAPPING AND SHOULD BE CONSIDERED APPROXIMATE. 2)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA AND REQUIRES A CERTIFIED FIELDTURF INSTALLER AND BUILDER TO IMPLEMENT THE PROPOSED CONDITIONS. 3)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA AND NO ATTEMPTS SHALL BE MADE TO DUPLICATE OR REPLICATE WITHOUT THE PREMISSION OF FIELDTURF. TRACK AND FIELD BASEBALL AND SOFTBALL FIELD 2 TENNIS
Page 112
PROJECT BUDGET
GRANBY MEMORIAL HIGH SCHOOL
TRACK & FIELD IMPROVEMENTS
Existing Conditions Aerial
Conceptual Layout
Date: April 18, 2025
Prepared For: Karl Gates - Athletic Director & Student Activities Coordinator
Prepared By: Andrew Dyjak – Regional Vice President, New England
Chris Hulk, PE – Regional Vice President, New England
Jonathan Luster, PE – Regional Construction Manager, New England
Address: Granby Memorial High School| 54 N Granby Rd, Granby, CT 06035
This budget proposal encompasses all facets of the project, with FieldTurf offering a comprehensive, turnkey solution
that includes design, project oversight, and construction. The budget is based on current site conditions, review meeting
with the school, and the planned construction period in spring/summer 2026.
FieldTurf pricing is based on the Capital Region Education Council (CREC) program. CREC is a member of The Association
of Educational Purchasing Agencies (AEPA) program. The AEPA is a purchasing co-op that provides member schools with
pre-determined preferential pricing by approved vendors. Since the product has already been bid at the national level,
individual schools do not have to duplicate the formal bid process. AEPA IFB #024.
Click on the following AEPA hyperlink for more information: AEPA IFB #24
Below is a detailed cost breakdown for site construction, turf installation and overall implementation of the project.
Page 113
PROJECT BUDGET Project Description: The existing track and field at Granby Memorial High School is in need of remediation efforts from sinks holes that have developed along the eastern side of the track / field. Based on geotechnical information provided by the Town, it appears that organic material has decayed below the eastern side of the track / field. The depths of this material are present up to 10’ below existing grade. Several options for remediation efforts have been developed with associated budgets. Final scope will require additional discussion and planning with the School and Town. FieldTurf has developed each option as a stand-alone project and also included several alternatives for consideration. For example, as part of Option 2, various areas of the track and field will need to be removed and based on the age and amount of removal it would be prudent to replace the full extent of the track surfacing and turf surfacing to begin new warranty period. Lastly, alternates have been included for site improvements such as LED lighting, press box, ball netting, etc… Depending on final scope, the project is anticipated to be constructed in a ±3-4-month timeframe. It is also anticipated that access and staging areas will be available nearby. This budget is intended to assist the school in preparing for this project. Additional discussions, review and programming will be required to refine the scope and budget prior to construction. FIELD REMEDIATION OPTIONS: ➢ Option 1 $1,150,000 - $1,300,000 • General Scope: Reconstruction of +/- 1/3 of Track/Field o Remove and dispose of existing track surfacing within limits shown o Cut and remove existing synthetic turf up to soccer field limits o Full depth mill of existing track pavement within limits shown o Excavate, remove and salvage existing field stone base and processed aggregate track base o Remove and dispose of existing turf anchor curb and track drain within limits shown o Remove and salvage existing storm drainage piping o Remove and dispose of existing electrical conduit and wiring within field area o Excavate and remove existing soils to a depth of approximately 10’ to remove unsuitable soils o Provided adequate shoring and safety measures o Town provided 3rd party field testing agency o Furnish and install new subgrade materials, compact in lifts to geotechnical recommendations o Furnish and install geogrid support mesh in 2 layers o Reinstall drainage piping and electrical conduits o Furnish and install new ACO drain and concrete turf anchor curb o Reinstall appropriate base materials for track and field areas o Install new pavement from limits of removal o Furnish and install new track surfacing and striping within limits shown o Furnish and install new synthetic turf within limits shown
Page 114
PROJECT BUDGET ➢ Option 2 $600,000 - $750,000 • General Scope: Extensive Exploration and Solidify o GPS located major sink hole areas and record for future exploration use o Remove and dispose of existing track surfacing within limits shown o Remove existing infill and roll back existing synthetic turf to soccer limits o Full depth mill of existing track pavement within limits shown o Excavate, remove and salvage existing field stone base and processed aggregate track base as necessary o Remove and dispose of existing turf anchor curb and track drain in various areas and install new o Remove and replace damaged sections of drainage piping o Remove and dispose of existing electrical conduit and wiring if encountered during exploration o Conduct a series of 10’ deep x 2’ diameter augur holes along eastern side of track / field o Remove and dispose of excavated material o Install flowable fill in all excavated holes to a depth of approximately 1’ below finished grade o Furnish and install geogrid support mesh prior to backfill o Town provided 3rd party field testing agency o Furnish and install new subgrade materials, compact in lifts to geotechnical recommendations o Reinstall drainage piping and electrical conduits as necessary o Furnish and install new ACO drain and concrete turf anchor curb o Reinstall appropriate base materials for track and field areas o Install new pavement from limits of removal o Furnish and install new track surfacing and striping within limits shown o Furnish and install new synthetic turf within limits shown SYNTHETIC TURF IMPROVEMENTS ➢ Synthetic Turf Installation $675,000 - $750,000 • Remove and recycle existing synthetic turf carpet and infill • Laser grade base stone and supplement base stone as needed in order to achieve planarity prior to turf installation • Furnish and install synthetic turf for field • Synthetic turf with SBR rubber and sand infill • Colored end zone • Alternating turf panels • Post installation GMAX field testing ➢ End Zone Letters $15,000 - $28,000 • “GRANBY” end zone lettering ➢ Midfield Logo $15,000 - $20,000 • Midfield Grizzly Style Logo
Page 115
PROJECT BUDGET
TRACK IMPROVEMENTS
➢ Track Base Reconstruction $375,000 - $450,000
• Remove and dispose of existing rubberized track surface
• Mill and dispose of existing asphalt base (Top 1.5”)
• Pave 1.5” asphalt base
o Match grades to existing perimeter trench drain which is to remain
➢ Track Surfacing BSS-100 $350,000 - $450,000
• Supply and install Beynon BSS-100 polyurethane track surfacing
o Base color: Beynon red
• Perform track striping
OR
➢ Track Surfacing BSS-300 $580,000 - $650,000
• Supply and install Beynon BSS-300 polyurethane track surfacing
o Base color: Beynon red
• Perform track striping
➢ Colored Exchange Zones $30,000 - $40,000
• (3) colored exchange zones
SITE IMPROVEMENTS
➢ New Perimeter Chain Link Fencing (1500 L.F.) $70,000 - $80,000
• Existing foundations and poles to remain and be painted
• Supply and install new 4’ height chain link mesh, top and bottom rails, and hardware
➢ 20’ Height Ball Safety Netting $80,000 - $95,000
• Supply and install 20-foot-high ball safety netting in D-Zones, including foundations,
sleeves, poles, netting, and hardware along the field end lines
➢ 10’ Height Ball Safety Netting $55,000 - $75,000
• Supply and install 10-foot-high ball safety netting in corners of field up to 20 yard line,
including foundations, sleeves, poles, netting, and hardware along the field end lines
➢ Press Box $175,000 - $225,000
• Furnish and install new press box behind existing bleachers
• Includes new foundation and support structure
• ADA access lift listed as separate item if needed
➢ ADA Lift $95,000 - $125,000
• Furnish and install new ADA accessible lift to press box
• Includes foundation and installation
Page 116
PROJECT BUDGET ➢ Retrofit of Existing Athletic Lighting $200,000 - $250,000 • Remove and dispose of existing light fixtures and replace with LED fixtures • Poles to remain ➢ New Bleachers with Press Box $650,000 - $750,000 • Furnish and install new double sided bleachers to service both fields (+/- 400 seats) • Furnish and install press box between fields for use for both fields • Furnish and install concrete slab for bleachers • Provide power supply EXCLUSIONS ➢ Any costs associated with necessary charges relating to the delineation of the field ➢ The supply of manholes or clean-outs or grates, or supply of the manhole covers ➢ Any alteration or deviation from specifications involving extra costs, which alteration or deviation will be provided only upon executed change orders, and will become an extra charge over and above the offered price ➢ Soil stabilization or remediation of any type ➢ Mass Excavation as required to achieve subgrade ➢ Rock excavation ➢ Offsite disposal of generated spoils ➢ Excavation or disposal of unsuitable or contaminated soils ➢ Site security ➢ Once subgrade has been established, a proof roll will be performed to ensure structural stability of the soils; in the event that unsuitable soils are encountered, a price to remedy these areas can be negotiated based on recommended methods per project Engineer ➢ Testing or Inspection Fees ➢ Site restoration, sodding, landscaping or grow- in beyond disturbed areas ➢ Repair or resurfacing existing asphalt parking lot if damaged by truck traffic ➢ Bond fees and non-local permits Please feel free to reach out to any member of our project team with questions about our offer: Andrew Dyjak Regional Vice President (860) 333-7839 Andrew.Dyjak@Fieldturf.com Chris Hulk Regional Vice President 203-676-4445 christopher.hulk@fieldturf.com Jonathan Luster, PE Regional Construction Manager (860) 227-4915 Jonathan.Luster@FieldTurf.com
Page 117
G R A N B Y G R A N B Y 0'15'60' SCALE: 1"=30'' 30' GRANBY MEMORIAL HIGH SCHOOL TRACK & FIELD 39 SCHOOL STREET GRANBY, CONNECTICUTACHUSETTSAPRIL 15, 2025 TRACK & FIELD Drawing: C:\USERS\T017224\DESKTOP\FIELDTURF\GRANBY\GRANBY HS CONCEPTS.DWG Layout Tab:TRACKPlotted by: T017224 On this date: Tue, 2025 April 15 - 7:32am FURNISH AND INSTALL NEW PRESS BOX REMEDIATION AREA OPTIONS: 1)OPTION 1: LIMITED WORK -CUT AND REMOVE TRACK SURFACING WITHIN LIMITS -REMOVE TURF INFILL AND PULL BACK CARPET -REMOVE EXISTING CONCRETE CURBING, PAVEMENT, STORM PIPING AND ELECTRICAL PIPING -EXCAVATE TO A DEPTH OF APPROXIMATELY 10' TO REMOVE UNSUITABLE SOILS -BACKFILL IN LIFTS TO PROPERLY COMPACT -RE-INSTALL DRAINAGE PIPING, ELECTRICAL AND CONCRETE TURF ANCHOR CURB -RE-PAVE TRACK WITHIN DISTURBED LIMITS -INSTALL NEW TRACK SURFACING AND REINSTALL TURF 2) OPTION 2: FULL UPDATE -REMOVE AND DISPOSE OF TRACK SURFACING -REMOVE AND RECYCLE EXISTING SYNTHETIC TURF -CONDUCT A SERIES OF APPROXIMATELY (30) 12"-16" DIAMETER AUGURED HOLES TO DEPTHS ASSUMED TO BE 8'-10' TO IDENTIFY OVERALL EXTENT OF UNSUITABLE SOILS --REMOVE AND DISPOSE OF EXCAVATED MATERIALS --BACKFILL WITH FLOWABLE FILL TO A DEPTH OF 1' BELOW FINISHED GRADE --INSTALL APPROPRIATE BASE MATERIALS -REMOVE AND REPLACE PORTIONS OF EXISTING CONCRETE CURBING, PAVEMENT, STORM PIPING AND ELECTRICAL PIPING -BACKFILL IN LIFTS TO PROPERLY COMPACT -FULL DEPTH MILL AND REPAVE TRACK IN LIMITS SHOWN -RESURFACE NEW BSS-100 OR BSS-300 TRACK SURFACING ON FULL TRACK -FINE GRADE EXISTING STONE BASE AND SUPPLEMENT AS NEEDED -INSTALL NEW SYNTHETIC TURF ON FULL FIELD NOTES: 1)ALL DESIGN AND EXISTING CONDITIONS MAPPING BASED ON AVAILABLE MAPPING AND SHOULD BE CONSIDERED APPROXIMATE. 2)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA AND REQUIRES A CERTIFIED FIELDTURF INSTALLER AND BUILDER TO IMPLEMENT THE PROPOSED CONDITIONS. 3)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA AND NO ATTEMPTS SHALL BE MADE TO DUPLICATE OR REPLICATE WITHOUT THE PREMISSION OF FIELDTURF. FULLY PROGRAMMABLE SCOREBOARD NEW GATES AT KEY LOCATIONS REMOVE AND REPLACE TRACK SURFACING REMOVE AND REPLACE SYNTHETIC TURF DUAL SIDED BLEACHERS WITH PRESS BOX RETROFIT EXISTING LIGHTING SYSTEM TO BE LED BALL SAFETY NETTING SYSTEM
Page 118
PROJECT BUDGET
GRANBY MEMORIAL HIGH SCHOOL
BASEBALL & SOFTBALL IMPROVEMENTS
Existing Conditions Aerial
Conceptual Layout
Date: April 21, 2025
Prepared For: Karl Gates - Athletic Director & Student Activities Coordinator
Prepared By: Andrew Dyjak – Regional Vice President, New England
Chris Hulk, PE – Regional Vice President, New England
Jonathan Luster, PE – Regional Construction Manager, New England
Address: Granby Memorial High School| 54 N Granby Rd, Granby, CT 06035
This budget proposal encompasses all facets of the project, with FieldTurf offering a comprehensive, turnkey solution
that includes design, project oversight, and construction. The budget is based on current site conditions, review meeting
with the school, and the planned construction period in spring/summer 2026.
FieldTurf pricing is based on the Capital Region Education Council (CREC) program. CREC is a member of The Association
of Educational Purchasing Agencies (AEPA) program. The AEPA is a purchasing co-op that provides member schools with
pre-determined preferential pricing by approved vendors. Since the product has already been bid at the national level,
individual schools do not have to duplicate the formal bid process. AEPA IFB #024.
Click on the following AEPA hyperlink for more information: AEPA IFB #24
Below is a detailed cost breakdown for site construction, turf installation and overall implementation of the project.
Page 119
PROJECT BUDGET Project Description: This project proposes to reconstruct the existing baseball to a new all-weather synthetic turf field with baseball, softball and overlay fields. The existing field will have all fencing, topsoil, irrigation, and clay removed. Earthmoving activities will be conducted to achieve proposed grades. The field will then have the concrete turf anchor curbing, stone base, and drainage system installed. Fencing of various heights and sizes will be installed and be integral to the concrete turf anchor curb. Additionally, a tension netting backstop system extending from one dugout to the other is proposed. Additional scope items such as new dugouts, new LED light fixtures, bleachers, and walkways have been added as alternates to the base bid. Depending on final scope, the project is anticipated to be constructed in a ± 4-month timeframe. It is also anticipated that access and staging areas will be available nearby. This budget is intended to assist the town in preparing for this project. Additional discussions, review, and programming will be required to refine the scope and budget prior to construction. ➢ Note: All plans will be developed by FieldTurf in house licensed professionally engineering staff ➢ Site Civil Construction o Install Sediment and Erosion Controls Including Construction Entrance Pad o Remove Existing Topsoil, Irrigation, And Fencing • Topsoil To Be Removed from Site o Import / Export General Fill to Meet Proposed Field Grades o Cut And Cap Existing Irrigation System • Install Turf Box with Quick Coupler Connection o Furnish And Install All Concrete Turf Anchor Curbing o Furnish And Install Fencing and Netting as Applicable o Furnish And Install Storm Drainage Piping and Flat Panel Drains o Installation Of Dynamic Stone Base Layers and Storm Drainage Overflow o Furnish And Install Concrete Pads and Walkways o Furnish And Install Tension Netting Backstop o Furnish And Install Batting Cage/ Bullpen Area o Fine Grade Field in Preparation of Synthetic Turf o Furnish And Install Concrete Slab for Dugouts and Portable Bleachers o Improve Paved Access to Field o Install Finish Materials and Restore Site to Pre-Construction Conditions ➢ Synthetic Turf o Furnish And Install Synthetic Turf for Field o Synthetic Turf with SBR Rubber and Sand Infill o Colors And Field Markings as Shown on Rendering o No logos or specialize lettering o Post Installation GMAX Field Testing SUGGESTED PROJECT BUDGET $ 2,900,000– $ 350,000
Page 120
PROJECT BUDGET ➢ Contingency o A typical project of this type and scope we would suggest a contingency for design, general conditions, and construction of 8% - 10%. This contingency would provide the School / Town level of safety for unknown site conditions such as rock removal, unsuitable soils, etc. ➢ Alternate: New Scoreboard $90,000 - $125,000 o Furnish And Install Multi-Use Scoreboard o Assumed Programmable Boards with Display/Naming Panel Above Board o Scoreboard (8’H X 25’W) ➢ Alternate: New LED Lighting Fixtures $675,000 - $750,000 o Furnish And Install New LED Light Fixtures on Existing Poles o Assumed 8 Pole System o New Power Supply within 100’ of Field EXCLUSIONS ➢ Any costs associated with necessary charges relating to the delineation of the field ➢ The supply of manholes or clean-outs or grates, or supply of the manhole covers ➢ Any alteration or deviation from specifications involving extra costs, which alteration or deviation will be provided only upon executed change orders, and will become an extra charge over and above the offered price ➢ Soil stabilization or remediation of any type ➢ Mass Excavation as required to achieve subgrade ➢ Rock excavation or ledge removal ➢ Offsite disposal of generated spoils ➢ Excavation or disposal of unsuitable or contaminated soils ➢ Site security ➢ Once subgrade has been established, a proof roll will be performed to ensure structural stability of the soils; in the event that unsuitable soils are encountered, a price to remedy these areas can be negotiated based on recommended methods per project Engineer ➢ Testing or Inspection Fees ➢ Site restoration, sodding, landscaping or grow- in beyond disturbed areas ➢ Repair or resurfacing existing asphalt parking lot if damaged by truck traffic ➢ Bond fees and non-local permits Please feel free to reach out to any member of our project team with questions about our offer: Andrew Dyjak Regional Vice President (860) 333-7839 Andrew.Dyjak@Fieldturf.com Chris Hulk Regional Vice President 203-676-4445 christopher.hulk@fieldturf.com Jonathan Luster, PE Regional Construction Manager (860) 227-4915 Jonathan.Luster@FieldTurf.com
Page 121
3 1 2 5 4 c 50 SEATS c 3 1 2 5 4 c 50 SEATS c 3 1 2 5 4 c 50 SEATS c GRANBY MEMORIAL HIGH SCHOOL BASEBALL FACILITY IMPROVEMENTS PLEASANT STREET GRANBY, CONNECTICUTAPRIL 14, 2025 BASEBALL Drawing: C:\USERS\T017224\DESKTOP\FIELDTURF\GRANBY\GRANBY HS CONCEPTS.DWG Layout Tab:BASEBALLPlotted by: T017224 On this date: Tue, 2025 April 15 - 6:57am 0'15'30' SCALE: 1"=30' 60' NOTES: 1)ALL DESIGN AND EXISTING CONDITIONS MAPPING BASED ON AVAILABLE MAPPING AND SHOULD BE CONSIDERED APPROXIMATE. 2)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA AND REQUIRES A CERTIFIED FIELDTURF INSTALLER AND BUILDER TO IMPLEMENT THE PROPOSED CONDITIONS. 3)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA AND NO ATTEMPTS SHALL BE MADE TO DUPLICATE OR REPLICATE WITHOUT THE PREMISSION OF FIELDTURF. DUAL BULLPEN SYNTHETIC TURF FIELD ±140,000 S.F. BASEBALL 310' L, 330'R, 490' C SOCCER 330'x195' SOFTBALL: 210' RADIUS FOUL POLE INTEGRAL TO FENCE LINE DUAL BATTING CAGES FOR BOTH SOFTBALL AND BASEBALL GAME SHADE STRUCTURE DUGOUT WITH FENCE SURROUND ON CONCRETE PAD (TYPICAL) CONCRETE PAD AND ACCESS FOR PORTABLE BLEACHERS VISITING BULLPEN POTENTIAL BLEACHER PAD BACKSTOP WITH TENSION NETTING AND WALL SYSTEM ATHLETIC FIELD LIGHTING (TYPICAL) IMPROVED FIELD ACCESS 30' HT. TENSION NETTING BACKSTOP PORTABLE FENCING FULLY PROGRAMMABLE SCOREBOARD
Page 122
PROJECT BUDGET
GRANBY MEMORIAL HIGH SCHOOL
TENNIS COURT IMPROVEMENTS
Existing Conditions Aerial
Conceptual Layout
Date: April 18, 2025
Prepared For: Karl Gates - Athletic Director & Student Activities Coordinator
Prepared By: Andrew Dyjak – Regional Vice President, New England
Chris Hulk, PE – Regional Vice President, New England
Jonathan Luster, PE – Regional Construction Manager, New England
Address: Granby Memorial High School| 54 N Granby Rd, Granby, CT 06035
This budget proposal encompasses all facets of the project, with FieldTurf offering a comprehensive, turnkey solution
that includes design, project oversight, and construction. The budget is based on current site conditions, review meeting
with the school, and the planned construction period in spring/summer 2026.
FieldTurf pricing is based on the Capital Region Education Council (CREC) program. CREC is a member of The Association
of Educational Purchasing Agencies (AEPA) program. The AEPA is a purchasing co-op that provides member schools with
pre-determined preferential pricing by approved vendors. Since the product has already been bid at the national level,
individual schools do not have to duplicate the formal bid process. AEPA IFB #024.
Click on the following AEPA hyperlink for more information: AEPA IFB #24
Below is a detailed cost breakdown for site construction, court installation and overall implementation of the project.
Page 123
PROJECT BUDGET Project Description: This project proposes to reconstruct the existing tennis courts to new post tension concrete courts. The existing tennis courts will be reclaimed in place and regrade to meet current standards. All existing vegetation, fencing, pavement and netting will be removed and disposed of. The reconstruction will also include all new post tension concrete courts, fencing, netting and court surfacing. Additionally, alternates have been added to the areas outside of the courts for new plantings, walkways, lighting, etc… The project is expected to be completed in +/- 3 months. The courts will be constructed in two separate slabs to accommodate the grade changes and court layout. It is anticipated that access and staging areas will be available nearby. This budget is intended to assist the school in preparing for this project. Additional discussions, review and programming will be required to refine the scope and budget prior to construction. ➢ Note: All plans will be developed by FieldTurf in house licensed professionally engineering staff ➢ TENNIS COURT RECONSTRUCTION $1,200,000 - $1,300,000 • Tennis Court Reconstruction o Install Sediment & Erosion Controls o Remove Existing Site Features o Reclaim Existing Pavement In Place o Perform Mass Earthwork Operations o Cuts And Fills to Meet Proposed Subgrade o Laser Grade Subgrade and Compact o Furnish And Install Gravel Base and Processed Aggregate Base Materials o Furnish And Install New Net Footings, Posts, Nets and Center Straps o Furnish And Install 5-1/2” Post Tensioned Concrete Court Slab • Structural Warranty of 50 years is included o Furnish And Install Black Vinyl Coated Chain Link Fence and Gates o Surface Courts With Up To 2 Colors o Furnish And Install All Court Striping ➢ Alternate 1: Walkways and Planting $115,000 - $150,000 o Furnish and install new concrete walkways o Furnish and install area for gazebo style covered area o Furnish and install plantings ➢ Alternate 2: Court Lighting $250,000 - $350,000 o Furnish and install new LED court lighting on 6 courts o Supply power from nearby source within 100’ of site o Supply digital control system for access via phone or internet for light controls
Page 124
PROJECT BUDGET EXCLUSIONS ➢ Any costs associated with necessary charges relating to the delineation of the field ➢ The supply of manholes or clean-outs or grates, or supply of the manhole covers ➢ Any alteration or deviation from specifications involving extra costs, which alteration or deviation will be provided only upon executed change orders, and will become an extra charge over and above the offered price ➢ Soil stabilization or remediation of any type ➢ Mass Excavation as required to achieve subgrade ➢ Rock excavation ➢ Offsite disposal of generated spoils ➢ Excavation or disposal of unsuitable or contaminated soils ➢ Site security ➢ Once subgrade has been established, a proof roll will be performed to ensure structural stability of the soils; in the event that unsuitable soils are encountered, a price to remedy these areas can be negotiated based on recommended methods per project Engineer ➢ Testing or Inspection Fees ➢ Site restoration, sodding, landscaping or grow- in beyond disturbed areas ➢ Repair or resurfacing existing asphalt parking lot if damaged by truck traffic ➢ Bond fees and non-local permits Please feel free to reach out to any member of our project team with questions about our offer: Andrew Dyjak Regional Vice President (860) 333-7839 Andrew.Dyjak@Fieldturf.com Chris Hulk Regional Vice President 203-676-4445 christopher.hulk@fieldturf.com Jonathan Luster, PE Regional Construction Manager (860) 227-4915 Jonathan.Luster@FieldTurf.com
Page 125
GRANBY MEMORIAL HIGH SCHOOL TENNIS FACILITY IMPROVEMENTS PLEASANT STREET GRANBY, CONNECTICUTAPRIL 14, 2025 TENNIS Drawing: C:\USERS\T017224\DESKTOP\FIELDTURF\GRANBY\GRANBY HS CONCEPTS.DWG Layout Tab:TENNISPlotted by: T017224 On this date: Tue, 2025 April 15 - 7:05am 0'15'30' SCALE: 1"=30' 60' NOTES: 1)ALL DESIGN AND EXISTING CONDITIONS MAPPING BASED ON AVAILABLE MAPPING AND SHOULD BE CONSIDERED APPROXIMATE. 2)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA AND REQUIRES A CERTIFIED FIELDTURF INSTALLER AND BUILDER TO IMPLEMENT THE PROPOSED CONDITIONS. 3)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA AND NO ATTEMPTS SHALL BE MADE TO DUPLICATE OR REPLICATE WITHOUT THE PREMISSION OF FIELDTURF. POST TENSION CONCRETE TENNIS COURTS ATHLETIC LIGHTING POTENTIAL COVERED PAVILION CONCRETE WALKWAY AND ACCESS PATH POTENTIAL BENCH SEATING PLANTINGS
Page 126
PROJECT BUDGET
GRANBY MEMORIAL HIGH SCHOOL
FIELD 2 IMPROVEMENTS
Existing Conditions Aerial
Conceptual Layout
Date: April 21, 2025
Prepared For: Karl Gates - Athletic Director & Student Activities Coordinator
Prepared By: Andrew Dyjak – Regional Vice President, New England
Chris Hulk, PE – Regional Vice President, New England
Jonathan Luster, PE – Regional Construction Manager, New England
Address: Granby Memorial High School| 54 N Granby Rd, Granby, CT 06035
This budget proposal encompasses all facets of the project, with FieldTurf offering a comprehensive, turnkey solution
that includes design, project oversight, and construction. The budget is based on current site conditions, review meeting
with the school, and the planned construction period in spring/summer 2026.
FieldTurf pricing is based on the Capital Region Education Council (CREC) program. CREC is a member of The Association
of Educational Purchasing Agencies (AEPA) program. The AEPA is a purchasing co-op that provides member schools with
pre-determined preferential pricing by approved vendors. Since the product has already been bid at the national level,
individual schools do not have to duplicate the formal bid process. AEPA IFB #024.
Click on the following AEPA hyperlink for more information: AEPA IFB #24
Below is a detailed cost breakdown for site construction, turf installation and overall implementation of the project.
Page 127
PROJECT BUDGET Project Description: The project proposes to replace the existing synthetic turf carpet with new synthetic turf. The existing turf will be cut into sections, rolled up, and removed from the field. The existing infill will either be placed in sacks for reuse or removed from the field and brought to a recycling facility. The field will then be laser graded to achieve planarity before the new turf is laid down and installed on the field. If additional topping stone is needed to achieve planarity, more stone will be brought in. Additional scope items such as new LED lighting pole and fixtures, ball safety netting, and walkways have been added to the budget below as well. Depending on final scope, the project is anticipated to be constructed in a ±2-3 month timeframe. It is also anticipated that access and staging areas will be available nearby. This budget is intended to assist the school in preparing for this project. Additional discussions, review and programming will be required to refine the scope and budget prior to construction. SYNTHETIC TURF IMPROVEMENTS ➢ Synthetic Turf Installation $650,000 - $700,000 • Remove And Recycle Existing Synthetic Turf Carpet And Infill • Laser Grade Base Stone And Supplement Base Stone As Needed In Order To Achieve Planarity Prior To Turf Installation • Furnish And Install Synthetic Turf For Field • Synthetic Turf With SBR Rubber And Sand Infill • Colors And Logos Per Rendering • Post Installation GMAX Field Testing ➢ Alternate: Midfield Logo $15,000 - $20,000 • Midfield Grizzly Style Bear ➢ Alternate: Improved Ball Netting $45,000 - $85,000 o Remove Existing Ball Netting o Furnish And Install New Ball Netting o Final Size And Location T.B.D. ➢ Alternate: New Scoreboard $65,000 - $95,000 o Furnish And Install Multi-Use Scoreboard o Assumed Programmable Boards With Display/Naming Panel Above Board o Scoreboard (8’h X 25’w) ➢ Alternate 5: New Led Lighting Fixtures $475,000 - $550,000 o Furnish And Install New Led Light Fixtures On Existing Poles o Assumed 4 Pole System o New Power Supply Within 100’ Of Field
Page 128
PROJECT BUDGET EXCLUSIONS ➢ Any costs associated with necessary charges relating to the delineation of the field ➢ The supply of manholes or clean-outs or grates, or supply of the manhole covers ➢ Any alteration or deviation from specifications involving extra costs, which alteration or deviation will be provided only upon executed change orders, and will become an extra charge over and above the offered price ➢ Soil stabilization or remediation of any type ➢ Mass Excavation as required to achieve subgrade ➢ Rock excavation ➢ Offsite disposal of generated spoils ➢ Excavation or disposal of unsuitable or contaminated soils ➢ Site security ➢ Once subgrade has been established, a proof roll will be performed to ensure structural stability of the soils; in the event that unsuitable soils are encountered, a price to remedy these areas can be negotiated based on recommended methods per project Engineer ➢ Testing or Inspection Fees ➢ Site restoration, sodding, landscaping or grow- in beyond disturbed areas ➢ Repair or resurfacing existing asphalt parking lot if damaged by truck traffic ➢ Bond fees and non-local permits Please feel free to reach out to any member of our project team with questions about our offer: Andrew Dyjak Regional Vice President (860) 333-7839 Andrew.Dyjak@Fieldturf.com Chris Hulk Regional Vice President 203-676-4445 christopher.hulk@fieldturf.com Jonathan Luster, PE Regional Construction Manager (860) 227-4915 Jonathan.Luster@FieldTurf.com
Page 129
0'10'20' SCALE: 1"=20' 40' GRANBY MEMORIAL HIGH SCHOOL FIELD 2 39 SCHOOL STREET GRANBY, CONNECTICUTACHUSETTSAPRIL 15, 2025 FIELD 2 Drawing: C:\USERS\T017224\DESKTOP\FIELDTURF\GRANBY\GRANBY HS CONCEPTS.DWG Layout Tab:FIELD 2Plotted by: T017224 On this date: Tue, 2025 April 15 - 7:48am NOTES: 1)ALL DESIGN AND EXISTING CONDITIONS MAPPING BASED ON AVAILABLE MAPPING AND SHOULD BE CONSIDERED APPROXIMATE. 2)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA AND REQUIRES A CERTIFIED FIELDTURF INSTALLER AND BUILDER TO IMPLEMENT THE PROPOSED CONDITIONS. 3)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA AND NO ATTEMPTS SHALL BE MADE TO DUPLICATE OR REPLICATE WITHOUT THE PREMISSION OF FIELDTURF. FULLY PROGRAMMABLE SCOREBOARD REMOVE AND REPLACE SYNTHETIC TURF DUAL SIDED BLEACHERS WITH PRESS BOX NEW LED FIELD LIGHTING SYSTEM BALL SAFETY NETTING SYSTEM IMPROVED FIELD ACCESS
Page 130
HALEY & ALDRICH, INC. 465 Medford St. Suite 2200 Boston, MA 02129 617.886.7400 www.haleyaldrich.com 28 July 2025 File No. 0206711-100 Granby Public Schools 15-B North Granby Road Granby, CT 06035 Attention: Christopher DeGray, Director of Facilities Subject: Subsurface Conditions and Geotechnical Data Report Granby Public Schools – Turf Field and Track Granby, CT Ladies and Gentlemen: This Report provides a summary of the subsurface explorations conducted within the limits of the existing synthetic turf field and track for Granby Public Schools (the School) located at 50 North Granby Road in Granby, Connecticut (subject site). The approximate location of the site is shown on Figure 1. The purpose of the subsurface investigation program conducted within the limits of the existing turf field and track was to obtain information on subsurface conditions encountered at the site, evaluate site fill thickness, and identify presence of potential void spaces within near surface soils. The work reported herein was undertaken by Haley & Aldrich, Inc. (Haley & Aldrich) in accordance with our proposal dated 30 April 2025 and your subsequent written authorization Existing Site Conditions Based on historic aerial photographs, the subject site has been used as an athletic field and track since at least 1992. We understand that the current synthetic turf field and track surface was constructed between 2012 and 2013 and that the proposed site grade changes required for construction in the area of observed track settlement were not significantly greater than the existing site grades. Existing site grades are approximately Elevation (El.) 220 to 225 (NAVD88)1 in the area of the track and athletic field surface. Settlement has been observed in various areas on the existing track surface and causes puddling after rain events, creating unsatisfactory performance conditions for athletics. 1 Elevations in this report are in feet and reference the North American Vertical Datum of 1988 (NAVD88).
Page 131
Granby Public Schools 28 July 2025 Page 2 Proposed Development The School intends to replace the existing synthetic field and track surface within the next 5 years to bring them to performance-level standards for Granby Athletics. Athletic lighting structures are also proposed to support athletic events after sunset. Subsurface Investigation Programs PREVIOUS HALEY & ALDRICH SUBSURFACE EXPLORATION PROGRAM Haley & Aldrich previously performed a subsurface investigation program in October 2022 on the site. The purpose was to observe the subsurface conditions specifically underlying the inside lane track in the northeast corner and evaluate the presence of possible void spaces beneath the track surface resulting in observed surficial settlement. On 20 October 2022, Seaboard Drilling, LLC of Chicopee, Massachusetts conducted a total of seven geoprobes designated HA-1 through HA-7. The drilling of geoprobes were observed by Haley & Aldrich. The designation and approximate locations of the geoprobes are shown on Figure 2 and geoprobe logs are included in Appendix A. RECENT SUBSURFACE EXPLORATION PROGRAM The purpose of the recent subsurface investigation program was to collect data beneath the existing turf field and track that may indicate future areas of settlement. Explorations were not performed to support the athletic lighting structures at this time. The designation and approximate location of subsurface explorations are indicated on Figure 2. The recent subsurface explorations were located in the field by Haley & Aldrich personnel by measuring from existing site features and therefore are considered approximate. Between 23 and 25 June 2025, G&M Subsurface of North Dighton, Massachusetts conducted a total of twenty-seven (27) geoprobe explorations within the limits of the existing synthetic turf field and track, designated GP-01 through GP-27. GeoSurfaces of Woburn, Massachusetts performed the opening and repair of the synthetic turf surfaces at each of the geoprobe locations on the existing field. The geoprobes were drilled to depths ranging from 10 to 20 (feet) ft below ground surface (bgs) with the use of a track-mounted geoprobe rig and were observed by Haley & Aldrich. Refer to the Geoprobe Logs included in Appendix B for additional information.
Page 132
Granby Public Schools 28 July 2025 Page 3 Subsurface Conditions SOIL CONDITIONS Subsurface soil conditions encountered in the recent subsurface exploration program consisted of the following generalized sequence of subsurface units, listed in descending order of occurrence below ground surface. Refer to Table I – Summary of Subsurface Conditions for a summary of the explorations performed in 2022 and 2025. Table I: Summary of Subsurface Conditions Generalized Subsurface Stratum Depth Top of Stratum (ft) Stratum Thickness (ft) Fill 0.3 to 1 0.4 to 15 Glaciofluvial Deposits 0.5 to 13 Not Determined Note: one or more of the units may be absent at any specific location and may vary in thickness across the subject site. A detailed description of the units encountered is provided below. Fill - The Fill encountered generally consisted of dark to light brown, red-brown, or gray-brown poorly- graded Sand or silty Sand with varying amounts of silt, gravel, topsoil, wood, and organic soil. At the recent geoprobe locations GP-03, GP-05, GP-13, GP-22, the fill noted buried wood and pockets of dark brown organic soil (topsoil) between 0.5 and 5 ft bgs. The Fill layer was encountered in each of the geoprobes, except for GP-01, GP-06, and GP-08, and ranged from 0.4 to 15 ft in thickness. A 0.5-ft-thick layer of crushed stone was encountered at ground surface at the locations of geoprobes conducted within the existing synthetic turf field. An approximate 0.1-ft-thick layer of track rubber followed by about 0.4 to 0.5-ft-thick layer of crushed stone was encountered at ground surface at the locations of geoprobes conducted within the limits of the existing track. The Fill layer was not fully penetrated at geoprobe GP-22 and HA-5 to a depth of 10 ft and at HA-6 to a depth of 15 ft. Glaciofluvial Deposits - Glaciofluvial Deposits were encountered beneath the Fill at each geoprobe location except for geoprobes GP-01, GP-06, and GP-08 where the Glaciofluvial Deposits were encountered underlying the crushed stone. Glaciofluvial Deposits generally consisted of tan to light brown or red-brown poorly-graded Sand. Glaciofluvial Deposits were not fully penetrated at any of the geoprobe locations.
Page 133
Granby Public Schools 28 July 2025 Page 4 GROUNDWATER LEVELS Groundwater was not encountered within the geoprobes at the time of drilling. Groundwater levels are influenced by precipitation, the presence of below-grade structures and utilities in the area, leakage into or out of utility pipes, the infiltration of surface water runoff, building underdrain systems, localized water recharging, and other factors. Groundwater conditions encountered during subsequent site visits and/or during construction may differ from those reported herein, and as additional groundwater measurements are obtained during subsequent design phases, this report will be updated. Geotechnical Mitigation Considerations Since areas of settlement have been observed within the turf field, the School has been performing routine maintenance consisting of a subcontractor removing the turf surface and filling in localized low spots. Additionally, the northeast corner of the track that was previously observed to experience settlement was patched and resurfaced between 2022 and 2023. Of the recent geoprobe explorations, locations GP-03, GP-05, GP-13, GP-22 encountered buried wood and pockets of dark brown organic soil (topsoil) between 0.5 and 5 ft bgs within the Fill layer. These locations are spread out across the track and field and are not located in one central area, suggesting that other locations or areas between explorations may encounter similar conditions subject to future settlement. Full-Depth Restoration (recommended) To mitigate the risk of future settlement, we recommend that a full depth restoration of the field and track surface be performed prior to replacement of the surfaces. Full depth restoration shall include: Site Preparation Strip, remove, and dispose of existing rubber track surface and synthetic turf field and crushed stone subbase. Excavate and remove the full depth of Fill up to a 5 ft depth beneath the track and field and 5 ft laterally outside the limits of the track. Within the limits shown on Figure 2, the northeast corner of the track is recommended to be excavated and removed up to 10 ft due to presence of deeper Fill materials that are unsuitable for subbase of the track. Segregate/screen/stockpile excavated Fill materials that are suitable for re-use as compacted granular fill beneath the track and field surface. Remove and dispose of unsuitable Fill material (buried topsoil, organic materials, wood, etc). Reuse of any excavated soils will be dependent upon visual characterization of the materials and results of grain size analyses and laboratory compaction tests. Accordingly, we recommend to
Page 134
Granby Public Schools 28 July 2025 Page 5 the extent possible that an on-site location be established for segregating, processing, and stockpiling excavated soils. Subgrade Preparation After the Fill has been excavated, the subgrade shall be compacted to 95% of the material’s maximum dry unit weight (determined in accordance with ASTM D1557) using appropriate compactive efforts. As a minimum, the subgrade should receive four complete coverages with suitable compaction equipment. The excavated material may be reused after the wood or degradable materials are removed from the Fill material. Place a woven geotextile fabric (Mirafi 600X or similar) on top of the prepared and approved subgrade as well as on the sides of the excavation. The excavation shall be backfilled with previously excavated Fill material suitable for re-use or Granular Fill placed in loose lift thicknesses not exceeding 12 inches (in.), and the material shall be compacted to 95% of the material’s maximum dry unit weight (determined in accordance with ASTM D1557) using appropriate compactive efforts. As a minimum, each layer of fill should receive four complete coverages with suitable compaction equipment. Following backfill and compaction to design subgrade elevation, re-construct the track and field. Refer to recommendations in following sections. Synthetic Turf Field Following completion of subgrade preparation to design subgrade elevation for the new turf system, prepare the subgrade using a large compaction roller to prepare a firm, dry and stable subgrade. If during static rolling of the subgrades pumping or weaving conditions are observed, alternative compaction techniques may be required and/or additional subgrade preparation may be recommended (e.g., removal and replacement of soft, compressible soils). At all times prior to placement of the turf system, we recommend maintaining a dry and undisturbed design subgrade to ensure a stable working surface to receive the turf system. Temporary re-grading outside the limits of the new field will be required to divert surface runoff away from the work areas. Construction dewatering is not anticipated; however, if it becomes necessary, efforts should be taken by the contractor to discharge dewatering effluent to an on- site recharge system at distances away from the work areas so as not to disturb subgrade preparation. For the permanent condition, the maintenance, protection and long-term performance of the synthetic turf field will require an effective stormwater runoff collection and management system. Anticipated subsurface soils at and/or within shallow depths of the anticipated design subgrade level for the new synthetic turf fields are likely to consist of fine-grained sandy silts/silty sands that have poor drainage characteristics – vertically and laterally. Design of any sub-turf drainage systems must consider the effect these impermeable subgrade soils can have on the field’s drainage capacity. At a minimum, the sub-turf drainage systems must be designed
Page 135
Granby Public Schools 28 July 2025 Page 6 such that the system is entirely and at all times above groundwater level. Design of the drainage system for the synthetic turf should be completed by a Civil Engineer. For this report, we recommend the subgrade be pitched to direct drainage towards the sub-turf drainage system that would be comprised of a minimum 10 to 12-in. thick layer of double-washed, 3/4-in. crushed stone with perforated HDPE pipes that are sized by the Civil Engineer and embedded within the crushed stone so as to effectively collect and transport by gravity any accumulated runoff water that filters from the turf layer above to an appropriately sized on-site collection/groundwater recharge tank or, alternatively, direct the discharge into a permitted storm drain. Prior to placing the crushed stone and perforated piping, a woven geotextile fabric (Mirafi 600X or similar) should be placed on top of the prepared and approved subgrade. Additionally, a backflow preventer at the outlet structure should be incorporated into the design of the drainage system. 3/4-in Crushed Stone shall consist of inert angular material derived from a stone quarry that is hard, durable, washed stone or crushed gravel, free from clay, loam, or other deleterious material, with a maximum size of 3/4 in, and conforming to the following: Sieve Size Percent Passing By Weight 1 in. 100 3/4 in. 90 – 100 1/2 in. 10 – 50 3/8 in. 0 – 20 No. 4 0 – 5 Synthetic Track Following preparation to subgrade elevation, provide a minimum 12-in. layer of Granular Fill for the subbase of the asphalt. Asphalt and rubberized track surface thickness should match original design drawings. Granular Fill shall be obtained from off-site sources and shall consist of naturally occurring or processed, inert material that is hard, durable natural stone and coarse sand, free from loam, clay, surface coatings, and deleterious materials. Sieve Size Percent Passing By Weight 3 in. 100 No. 4 30 – 90 No. 40 10 – 50 No. 200 0 – 8
Page 136
Granby Public Schools 28 July 2025 Page 7 If portions of the proposed track extend beyond the existing plan limits of the existing track, we recommend complete removal of the existing topsoil prior to compacting the subgrade and placement and compaction of a minimum 12-in. thick lift of granular fill to design subgrade elevation. Track and Field Surface Restoration (alternate consideration with routine maintenance) If project construction costs associated with the recommended over-excavation and backfilling are determined to not be acceptable to the School, the reduced scope of track and field surface restorations could be considered by the School as an alternate consideration that would not require the subgrade preparation in the full-depth restoration recommendation. This option would not mitigate the risk of potential long term field performance issues due to the presence of the remaining unsuitable soils below the over-excavation limits but could allow the track and field to be utilized in the short term and would require periodic maintenance of both the synthetic turf field and track. For this consideration, the track and field surface restoration would consist of: Remove/mill track surface down to asphalt base layer, patch observed cracks and shim depressions in the asphalt, and replace with new synthetic track surface/system. Remove synthetic turf surface/carpet, raise grade with additional crushed stone where needed, and replace with new synthetic turf surface. Prior to installing the new synthetic turf, the existing drainage stone should be tested to confirm design infiltration rate of the drainage layer is consistent with the synthetic turf field provider’s requirements. Additionally, an inspection of the existing drainage piping (lateral field and perimeter drain lines) should be completed to confirm the drainage system is functioning as originally designed and meets stormwater management requirements for the new turf field system. Surface track and synthetic turf surface restoration should be conducted by a specialty contractor familiar with the construction and repair of synthetic turf and track systems. Limitations This letter was prepared in accordance with our proposal dated 30 April 2025 and your subsequent written authorization. This letter has been prepared for the specific application to the Granby Public Schools synthetic turf field and track. The nature and extent of variations in the subsurface conditions between explorations may not become evident until construction, and the project design may change from our current understanding. Any additional information pertaining to the project that becomes available should be provided to Haley & Aldrich, so that our conclusions and recommendations can be reviewed and modified, as necessary.
Page 137
Granby Public Schools 28 July 2025 Page 8 We appreciate the opportunity to provide engineering services on this project. Please do not hesitate to call if you have any questions or comments. Sinc erely yours, HALEY & ALDRICH, INC. M egan H. Carlson, PE (NY) R. S cott Goldkamp, PE (MA/NH) Project Manager Principal Attachments: Figure 1 – Site Locus Figure 2 – Site and Subsurface Exploration Location Plan Appendix A – Previous Geoprobe Logs Appendix B – Recent Geoprobe Logs \\haleyaldrich.com\share\CF\Projects\0206711\Granby Public Schools\Report\2025-0728-HAI-Granby Public Schools-Geotechnical Data Report-F.docx
Page 138
APPROXIMATE SCALE: 1 INCH = 2,000 FEET 41°57'39"N, 72°47'43"W FIGURE 1MAP SOURCE: USGS 0206711_100_LOCUS HALEYALDRICH\ACORTINA JULY 2025 SITE COORDINATES: PROJECT LOCUS GRANBY PUBLIC SCHOOLS - TURF FIELD AND TRACK 50 NORTH GRANBY ROAD GRANBY, CT
Page 139
FIGURE 2 SITE AND SUBSURFACE EXPLORATION LOCATION PLAN SCALE: DESIGNATION AND APPROXIMATE LOCATION OF GEOPROBE PERFORMED BY G&M SUBSURFACE FROM 23 TO 25 JUNE 2025 AND OBERSVED BY HALEY & ALDRICH, INC. BASE PLAN OBTAINED FROM DRAWING NO. L.2.A TITLED "SITE GRADING PLAN" PREPARED BY CR3 LLP AND DATED 16 JANUARY 2013. ELEVATIONS REFERENCE THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD 88). GRANBY PUBLIC SCHOOLS - TURF FIELD AND TRACK GRANBY, CONNECTICUT 1" = 40' JULY 2025 NOTES 1. LEGEND GP-01 GP-01 GP-02 GP-03 GP-04 GP-05 GP-06 GP-07 GP-08 GP-09 GP-10 GP-11 GP-12 GP-13 GP-14 GP-15 GP-16 GP-17 GP-18 GP-19 GP-20 GP-21 GP-22 GP-23 GP-24 GP-25 GP-26 GP-27 DESIGNATION AND APPROXIMATE LOCATION OF GEOPROBE PERFORMED BY SEABOARD DRILLING ON 20 OCTOBER 2022 AND OBSERVED BY HALEY & ALDRICH, INC. HA-1 HA-5 HA-1 HA-6 HA-3 HA-2 HA-4 HA-7 2. N AREA OF ADDITIONAL EXCAVATION REQUIRED UP TO 10 FT DEPTH
Page 140
APPENDIX A Previous Geoprobe Logs
Page 141
IDENTIFICATION AND DESCRIPTION OF SUBSURFACE MATERIALS I SOIL Soil description on logs of subsurface explorations are based on Standard Penetration Test results, visual-manual examination of exposed soil and soil samples, and the results of laboratory tests on selected samples. The criteria, descriptive terms and definitions are as follows: DENSITY OR CONSISTENCY Penetration Penetration Density of Resistance Consistency of Resistance Cohesionless Soils (Blows �er ft.) Cohesive Soils (Blows �er ft.) Very Loose 0-4 Very Soft 0-2 Loose 5-10 Soft 3-4 Medium 11-30 Medium 5-8 Dense 31-50 Stiff 9-15 Very Dense over 50 Very Stiff 16-30 Hard over 30 PENETRATION RESISTANCE Standard Penetration Test (ASTM D-1586) - Number of blows required to drive a standard 2 in. O.D. split spoon sampler 1 ft. with a 140 lb. weight falling freely through 30 in. COLOR: Basic colors and combinations: black, brown, gray, yellow-brown, etc. U.S. Standard Series Seive 12" 3" 3/4" I I Gravel Boulders Cobbles I I Coarse Fine 4 I I SUPPLEMENTAL SOIL TERMINOLOGY: Laminae Parting Seam Layer Stratum Pocket Lens Occasional Frequent I nterbedded Varved Mottled - 0 to 1/16 in. thick (cohesive) - 0 to 1/16 in. thick (granular) - 1/16101/2 in. thick - 1/2 to 12 in. thick - > 12 in. thick - Small, erratic deposit less than 12 in. size - Lenticular deposit larger than a pocket - One or less per 12 in. of thickness - More than one per 12 in. of thickness - Alternating soil layers of differing composition - Alternating thin seams of silt and clay - Variation of color GEOLOGIC INTERPRETATION Deposit type - GLACIAL TILL, ALLUVIUM, FILL ..... The natural soils are identified by criteria of Unified Soil Classification System (USCS), with appropriate group symbol in parenthesis for each soil description. Fill materials may not be classified by USCS criteria. Clear Square Sieve Openings 10 40 200 Sand I I I Silts and Clays Coarse Medium Fine I I l 305 mm 76 mm 19 mm 4.75 mm 2.00 mm 0.43 mm 0.074 mm r-:t---------------------------------------------------------------1 N 0 UNIFIED SOIL CLASSIFICATION SYSTEM "' 2 1--------------------------------"Ti----,----,1--------------------------I N MAJOR DIVISIONS Group Graphic TYPICAL NAMES � Symbol Symbol z l---------,-------------r-------------..L-,--!,.-.,....,..---'--------------------------1 0 '3 0:: ::::, CJ)m ::::, z 0 Coarse grained soils: more than half is larger than number 200 sieve Gravels More than half of coarse fraction is larger than number 4 sieve Sands Gravels with little or no fines Gravels with over 12% fines Sands with little or no fines Sands with over I Well graded gravels, gravel-sand mixtures Poorly graded gravels, gravel-sand mixtures Silty gravels, poorly graded gravel-sand-silt mixtures GC 7; Clayey gravels, poorly graded gravel-sand-clay mixtures SW � � Well graded sands, gravelly sands SP Poorly graded sands, gravelly sands SM I 11 I I 11 I Silty sands, poorly graded sand-silt mixtures - o:: Clayey sands, poorly graded sand-clay mixtures '31---------+-----------'-----------------li--+...,,....,!---------------------------I More than half of coarse fraction is smaller than number 4 siev 12% fines SC �� '-- - � ML I I Inorganic silts and very fine sands, rock flour, silly or clayey fine w Silts and Clays sands or clayey silts with slight plasticity � CL I// J Inorganic clays of low to medium plasticity, gravelly clays, sandy o::::::, Fined-grained ·II, clays, silty clays, lean clays soils: Liquid limit 50% or less � OL a Organic clays and organic silty clays of low plasticity CJ) more than half ui smaller than MH Inorganic silty, micaceous or diatomaceous fine sandy or silty soils, t'.j number 200 Silts and Clays elaStic silts � W, � sieve Liquid limit greater than 50% CH � Inorganic clays of high plasticity, fat clays ...J �x w OH �X Organic clays of medium to high plasticity, organic sills u::1-----------'---------------------------ll--+"-,.,...,.---------------------------I � Highly organic soils PT � Peat and other highly organic soils ifil--------------------------------....ii....-.i.... ..... ---------------------------1 ...J w (.) ::;; w S2 ., GENERAL NOTES 1. Logs of subsurface explorations depict soil, rock and groundwater conditions only at the locations specified on the dates indicated. Subsurface conditions may vary at other locations and at other times. 2. Water levels noted on the logs were measured at the times and under the conditions indicated. During test borings, these water levels could have been affected by the introduction of water into the borehole, extraction of tools on other procedures and thus may not reflect actual groundwater level at the test boring location. Groundwater level fluctuations may also occur as a result of variations in precipitation, temperature, season, tides, adjacent construction activities and pumping of water supply wells and construction dewatering systems. ROCK Rock descriptions noted on logs of subsurface explorations are based on visual-manual examination of exposed rock outcrops and core samples. The criteria, descriptive terms and definitions used are as follows: FIELD HARDNESS: A measure of resistance to scratching. Very Hard Cannot be scratched with a knife point or sharp pick. Hard Can be scratched with a knife point or sharp pick, only with difficulty. Moderately Hard Can be readily scratched with a knife point or pick. Medium Hard Can be grooved or gouged 1/16 in. deep with firm pressure on a knife point or sharp pick. Soft Can be grooved or gouged easily with a knife point or pick. Very Soft Can be carved with a knife and excavated with a pick point. WEATHERING: The action of organic and inorganic and chemical and physical processes resulting in alteration of color, texture and composition. Fresh-FR Slight-SL Moderate-MOD High-HIGH No visible sign of alteration, except perhaps slight discoloration on major discontinuity surfaces. Discoloration of rock material and discontinuity surfaces. All rock may be discolored and/or somewhat weaker than in its fresh condition. Less than half the rock material is decomposed and/or disintegrated to a soil. Some fresh or discolored rock is present as either a continuous framework or as corestones. More than half the rock material is decomposed and/or disintegrated to a soil. Fresh or discolored rock is present as either a discontinuous framework or as corestones. Complete-COMP All rock material is decomposed and/or disintegrated to soil. The original mass structure is largely intact. Residual Soil All rock material is converted to soil. The mass structure and material fabric are destroyed. There has been a large change of volume, but the material has not been significantly transported. COLOR: Basic colors and combinations: gray, light gray, brown, red-brown. TEXTURE: Size, shape and arrangements of constituents. Term Size Igneous >5 mm 1 -5 mm < 1 mm Sedimentary >2 mm 0.625 -2 mm < 0.625 mm Coarse-grained Medium-grained Fine-grained Aphanitic Individual grains invisible to the unaided eye. LITHOLOGY: Rock classification and modifiers; accepted formation names. DISCONTINUITIES: � Joint Definition Shear Fault Shear or Fault Zone A natural fracture along which no displacement has occurred. May occur in parallel groups called sets. A natural fracture along which displacement has occurred. Surface may be slickensided or striated. A natural fracture along which displacement has occurred. Usually lined with gouge and slickensides. Zone of fractured rock and gouge bordering the displacement plane. ORIENTATION/ATTITUDE: Term Horizontal Angle (degrees) 0-5 Low Angle Moderately Dipping High Angle 6-35 36-55 56-85 Vertical SPACING: Discontinuity Term Extremely Close Very Close Close Moderate Wide Very Wide Extremely Wide Bedding Term Extremely Thin Very Thin Thin Medium Thick Very Thick Extremely Thick 86-100 Inches < 3/4 3/4 - 2.5 2.5 -8 8-24 24 - 80 80 - 240 > 240 PERSISTENCE/CONTINUITY: APERTURE/GAP: Term Very Low Low Medium High Very High POROSITY: � Primary: Feet 0-3 3-10 10-35 35-65 > 65 Term Very Tight Tight Partly Open Open Moderately Wide Wide Very Wide Extremely Wide Cavernous Distance <0.1mm 0.1 mm-0.25mm 0.25mm-0.5mm 0.5mm-2.5mm 2.5mm-1cm >1cm 1cm-10cm 10cm-1m > 1m Pre-depositional and depositional inter- and intra- granular, particle, or crystalline pores. Secondary: Solution features including pits, vugs, caverns, molds, and channels. Fracture features including joints, shears, faults, shrinkage and breccia fabrics. Term Micro Meso Mega Size < 0.0625 mm 0.0625-4.0 mm 4.0-256 mm SUBSURFACE EXPLORATION KEY
Page 142
0.0 5.0 5.0 10.0 10.0 15.0 G1 42 G2 36 G3 36 221.9 0.1 221.4 0.6 211.0 11.0 207.0 15.0 SW SP SM SM SP -TRACK RUBBER- -ASPHALT- Gray to gray-brown well-graded SAND with gravel (SW), no structure, no odor, dry - FILL - Light red-brown to tan poorly-graded SAND (SP), no structure, no odor, moist, trace organics Light brown to tan SAND (SM), no structure, no odor, wet, wood fragments, trace organics Gray to gray-brown silty SAND (SM), no structure, no odor, moist, trace wood fragments, trace organics Light brown to tan poorly-graded SAND with gravel (SP), no structure, no odor, wet - GLACIOFLUVIAL DEPOSITS - BOTTOM OF EXPLORATION 15.0 FT 5 5 10 15 10 10 10 10 10 10 15 10 20 15 20 20 20 55 60 45 30 55 15 25 Elevation Location Time (hr.) HA-1 Inside Diameter (in.) Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High J. Shaw G3 Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) Rig Make & Model: Grout Screen Well Diagram Geoprobe 6620G S - Splitspoon Sample Finish O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample Casing Casing: PID Make & Model: Hoist/Hammer: Date Push Bottom Filter Sand 1 H&A Rep. 0.0 Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples Datum Type Barrel Water Concrete Hammer Fall (in.) Bentonite Seal Drilling Equipment and Procedures Start 15.0 Boring No. - G - Geoprobe of Hole None Summary Field Tests: Drill Mud: Hammer Weight (lb) -Auto 1of M. Kern HA-1 Bit Type: Bottom - Automatic Hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon Elapsed 222.0 (est.) File No. Sheet No. 0206711-000 Driller Riser Pipe See Plan NAVD88 October 20, 2022 October 20, 2022 Client Contractor Sea Board Drilling Project R.A.D. SPORTS GRANBY HIGH SCHOOL TRACK, 54 N GRANBY RD, GRANBY CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY - COPY.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\0206711-GP.GPJ Nov 7, 22 Depth (ft) 0 5 10 15 Sample No. & Rec. (in.) Stratum Change Elev/Depth (ft) USCS Symbol VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Density/consistency, color, GROUP NAME & SYMBOL, structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 143
0.0 5.0 5.0 10.0 10.0 15.0 G1 42 G2 24 G3 42 221.9 0.1 221.4 0.6 212.0 10.0 207.0 15.0 SW SP CL SP SP SP -TRACK RUBBER- -ASPHALT- Gray to gray-brown well-graded SAND with gravel (SW), no structure, no odor, dry Light brown to tan poorly-graded SAND with gravel (SP), no structure, no odor, dry Gray-brown sandy lean CLAY (CL), no structure, no odor, moist, trace organics, trace wood, appears disturbed Red-brown to light brown poorly-graded SAND (SP), no structure, no odor, dry Note: Upon advancing geoprobe sleeve, observed little to no resistance between 5.4 to 5.8 ft. - FILL - Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry Light brown to tan poorly-graded SAND (SP), no structure, no odor, moist -GLACIOFLUVIAL DEPOSITS- BOTTOM OF EXPLORATION 15.0 FT 5 10 15 10 10 10 10 10 15 15 15 20 15 10 20 20 30 55 60 20 55 55 45 70 Elevation Location Time (hr.) HA-2 Inside Diameter (in.) Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High J. Shaw G3 Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) Rig Make & Model: Grout Screen Well Diagram Geoprobe 6620G S - Splitspoon Sample Finish O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample Casing Casing: PID Make & Model: Hoist/Hammer: Date Push Bottom Filter Sand 1 H&A Rep. 0.0 Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples Datum Type Barrel Water Concrete Hammer Fall (in.) Bentonite Seal Drilling Equipment and Procedures Start 15.0 Boring No. - G - Geoprobe of Hole None Summary Field Tests: Drill Mud: Hammer Weight (lb) -Auto 1of M. Kern HA-2 Bit Type: Bottom - Automatic Hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon Elapsed 222.0 (est.) File No. Sheet No. 0206711-000 Driller Riser Pipe See Plan NAVD88 October 20, 2022 October 20, 2022 Client Contractor Sea Board Drilling Project R.A.D. SPORTS GRANBY HIGH SCHOOL TRACK, 54 N GRANBY RD, GRANBY CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY - COPY.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\0206711-GP.GPJ Nov 7, 22 Depth (ft) 0 5 10 15 Sample No. & Rec. (in.) Stratum Change Elev/Depth (ft) USCS Symbol VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Density/consistency, color, GROUP NAME & SYMBOL, structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 144
0.0 5.0 5.0 10.0 10.0 15.0 G1 36 G2 36 G3 36 221.9 0.1 221.4 0.6 212.5 9.5 212.0 10.0 207.0 15.0 SW SP SP SP SM SP -TRACK RUBBER- -ASPHALT- Gray to gray-brown well-graded SAND with gravel (SW), no structure, no odor, dry Light brown to tan poorly-graded SAND (SP), no structure, no odor, dry Light brown to brown poorly-graded SAND (SP), no structure, no odor, dry Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry -FILL- Light brown silty SAND (SM), no structure, no odor, dry Light brown to tan poorly-graded SAND (SP), no structure, no odor, moist - GLACIOFLUVIAL DEPOSITS - BOTTOM OF EXPLORATION 15.0 FT 5 10 10 10 10 10 15 15 15 15 20 20 20 20 20 30 55 55 55 55 40 55 40 Elevation Location Time (hr.) HA-3 Inside Diameter (in.) Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High J. Shaw G3 Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) Rig Make & Model: Grout Screen Well Diagram Geoprobe 6620G S - Splitspoon Sample Finish O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample Casing Casing: PID Make & Model: Hoist/Hammer: Date Push Bottom Filter Sand 1 H&A Rep. 0.0 Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples Datum Type Barrel Water Concrete Hammer Fall (in.) Bentonite Seal Drilling Equipment and Procedures Start 15.0 Boring No. - G - Geoprobe of Hole None Summary Field Tests: Drill Mud: Hammer Weight (lb) -Auto 1of M. Kern HA-3 Bit Type: Bottom - Automatic Hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon Elapsed 222.0 (est.) File No. Sheet No. 0206711-000 Driller Riser Pipe See Plan NAVD88 October 20, 2022 October 20, 2022 Client Contractor Sea Board Drilling Project R.A.D. SPORTS GRANBY HIGH SCHOOL TRACK, 54 N GRANBY RD, GRANBY CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY - COPY.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\0206711-GP.GPJ Nov 7, 22 Depth (ft) 0 5 10 15 Sample No. & Rec. (in.) Stratum Change Elev/Depth (ft) USCS Symbol VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Density/consistency, color, GROUP NAME & SYMBOL, structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 145
0.0 5.0 5.0 10.0 10.0 15.0 G1 30 G2 12 G3 42 221.9 0.1 221.4 0.6 209.0 13.0 207.0 15.0 SW SP SP SP SP SM -TRACK RUBBER- -ASPHALT- Gray to gray-brown well-graded SAND with gravel (SW), no structure, no odor, dry Light brown poorly-graded SAND (SP), no structure, no odor, dry Light brown to red-brown poorly-graded SAND (SP), no structure, no odor, dry Note: Upon advancing geoprobe sleeve, observed little to no resistance between 5.4 to 5.8 ft. - FILL - Light red-brown poorly graded SAND (SP), no structure, no odor, dry, pockets of dark brown organics, occasional brick specks, appears disturbed Light brown poorly-graded SAND with gravel (SP), no structure, no odor, dry Light brown silty SAND (SM), no structure, no odor, dry - GLACIOFLUVIAL DEPOSITS - BOTTOM OF EXPLORATION 15.0 FT 5 5 10 10 10 10 10 15 15 10 15 20 20 20 20 20 20 55 55 55 70 50 40 40 Elevation Location Time (hr.) HA-4 Inside Diameter (in.) Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High J. Shaw G3 Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) Rig Make & Model: Grout Screen Well Diagram Geoprobe 6620G S - Splitspoon Sample Finish O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample Casing Casing: PID Make & Model: Hoist/Hammer: Date Push Bottom Filter Sand 1 H&A Rep. 0.0 Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples Datum Type Barrel Water Concrete Hammer Fall (in.) Bentonite Seal Drilling Equipment and Procedures Start 15.0 Boring No. - G - Geoprobe of Hole None Summary Field Tests: Drill Mud: Hammer Weight (lb) -Auto 1of M. Kern HA-4 Bit Type: Bottom - Automatic Hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon Elapsed 222.0 (est.) File No. Sheet No. 0206711-000 Driller Riser Pipe See Plan NAVD88 October 20, 2022 October 20, 2022 Client Contractor Sea Board Drilling Project R.A.D. SPORTS GRANBY HIGH SCHOOL TRACK, 54 N GRANBY RD, GRANBY CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY - COPY.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\0206711-GP.GPJ Nov 7, 22 Depth (ft) 0 5 10 15 Sample No. & Rec. (in.) Stratum Change Elev/Depth (ft) USCS Symbol VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Density/consistency, color, GROUP NAME & SYMBOL, structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 146
0.0 5.0 5.0 10.0 G1 36 G2 24 221.9 0.1 221.4 0.6 212.0 10.0 SW SP SP SM -TRACK RUBBER- -ASPHALT- Gray to gray-brown well-graded SAND with gravel (SW), no structure, no odor, dry Light brown poorly-graded SAND with gravel (SP), no structure, no odor, moist Note: Upon advancing geoprobe sleeve, observed little to no resistance between 2.4 to 2.6 ft. -FILL- Light brown to red-brown poorly-graded SAND (SP), no structure, no odor, moist Brown poorly-graded SAND (SM), no structure, no odor, moist, bottom 2 in. wood, dark lenses of organics, possible former Topsoil/Loess horizon, disturbed BOTTOM OF EXPLORATION 10.0 FT 5 5 10 10 10 10 15 15 10 20 20 20 10 55 50 55 50 30 Elevation Location Time (hr.) HA-5 Inside Diameter (in.) Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High J. Shaw G2 Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) Rig Make & Model: Grout Screen Well Diagram Geoprobe 6620G S - Splitspoon Sample Finish O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample Casing Casing: PID Make & Model: Hoist/Hammer: Date Push Bottom Filter Sand 1 H&A Rep. 0.0 Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples Datum Type Barrel Water Concrete Hammer Fall (in.) Bentonite Seal Drilling Equipment and Procedures Start 15.0 Boring No. - G - Geoprobe of Hole None Summary Field Tests: Drill Mud: Hammer Weight (lb) -Auto 1of M. Kern HA-5 Bit Type: Bottom - Automatic Hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon Elapsed 222.0 (est.) File No. Sheet No. 0206711-000 Driller Riser Pipe See Plan NAVD88 October 20, 2022 October 20, 2022 Client Contractor Sea Board Drilling Project R.A.D. SPORTS GRANBY HIGH SCHOOL TRACK, 54 N GRANBY RD, GRANBY CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY - COPY.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\0206711-GP.GPJ Nov 7, 22 Depth (ft) 0 5 10 Sample No. & Rec. (in.) Stratum Change Elev/Depth (ft) USCS Symbol VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Density/consistency, color, GROUP NAME & SYMBOL, structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 147
0.0 5.0 5.0 10.0 10.0 15.0 G1 42 G2 36 G3 30 221.9 0.1 221.4 0.6 207.0 15.0 SW SP SM SP SP -TRACK RUBBER- -ASPHALT- Gray to gray-brown well-graded SAND with gravel (SW), no structure, no odor, dry Light brown poorly-graded SAND with gravel (SP), no structure, no odor, dry Light brown to tan silty SAND (SM), no structure, no odor, moist, occasional dark brown organic lenses Brown to tan poorly-graded SAND (SP), no structure, no odor, moist, bottom 5 in. wood - FILL- Light brown to tan poorly-graded SAND (SP), no structure, no odor, moist, trace organic lenses, trace brick particles, block of wood (3 in. length) in middle of sample BOTTOM OF EXPLORATION 15.0 FT 5 5 10 10 10 10 10 10 15 15 15 15 20 20 20 20 20 55 50 25 50 55 30 5 Elevation Location Time (hr.) HA-6 Inside Diameter (in.) Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High J. Shaw G3 Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) Rig Make & Model: Grout Screen Well Diagram Geoprobe 6620G S - Splitspoon Sample Finish O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample Casing Casing: PID Make & Model: Hoist/Hammer: Date Push Bottom Filter Sand 1 H&A Rep. 0.0 Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples Datum Type Barrel Water Concrete Hammer Fall (in.) Bentonite Seal Drilling Equipment and Procedures Start 10.0 Boring No. - G - Geoprobe of Hole None Summary Field Tests: Drill Mud: Hammer Weight (lb) -Auto 1of M. Kern HA-6 Bit Type: Bottom - Automatic Hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon Elapsed 222.0 (est.) File No. Sheet No. 0206711-000 Driller Riser Pipe See Plan NAVD88 October 20, 2022 October 20, 2022 Client Contractor Sea Board Drilling Project R.A.D. SPORTS GRANBY HIGH SCHOOL TRACK, 54 N GRANBY RD, GRANBY CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY - COPY.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\0206711-GP.GPJ Nov 7, 22 Depth (ft) 0 5 10 15 Sample No. & Rec. (in.) Stratum Change Elev/Depth (ft) USCS Symbol VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Density/consistency, color, GROUP NAME & SYMBOL, structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 148
0.0 5.0 5.0 10.0 10.0 15.0 G1 42 G2 36 G3 42 221.9 0.1 221.4 0.6 221.0 1.0 215.0 7.0 207.0 15.0 SW SP SP SP -TRACK RUBBER- -ASPHALT- Gray to gray-brown well-graded SAND with gravel (SW), no structure, no odor, dry - FILL - Light brown to brown poorly-graded SAND (SP), no structure, no odor, dry, trace brick - FILL - Tan to light red-brown poorly-graded SAND with gravel (SP), no structure, no odor, dry - GLACIOFLUVIAL DEPOSITS - Light red-brown poorly-graded SAND (SP), no structure, no odor, dry BOTTOM OF EXPLORATION 15.0 FT 5 5 10 10 10 10 15 20 20 20 55 55 65 100 Elevation Location Time (hr.) HA-7 Inside Diameter (in.) Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High J. Shaw G3 Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) Rig Make & Model: Grout Screen Well Diagram Geoprobe 6620G S - Splitspoon Sample Finish O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample Casing Casing: PID Make & Model: Hoist/Hammer: Date Push Bottom Filter Sand 1 H&A Rep. 0.0 Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples Datum Type Barrel Water Concrete Hammer Fall (in.) Bentonite Seal Drilling Equipment and Procedures Start 15.0 Boring No. - G - Geoprobe of Hole None Summary Field Tests: Drill Mud: Hammer Weight (lb) -Auto 1of M. Kern HA-7 Bit Type: Bottom - Automatic Hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon Elapsed 222.0 (est.) File No. Sheet No. 0206711-000 Driller Riser Pipe See Plan NAVD88 October 20, 2022 October 20, 2022 Client Contractor Sea Board Drilling Project R.A.D. SPORTS GRANBY HIGH SCHOOL TRACK, 54 N GRANBY RD, GRANBY CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY - COPY.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\0206711-GP.GPJ Nov 7, 22 Depth (ft) 0 5 10 15 Sample No. & Rec. (in.) Stratum Change Elev/Depth (ft) USCS Symbol VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Density/consistency, color, GROUP NAME & SYMBOL, structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 149
APPENDIX B Recent Geoprobe Logs
Page 150
0.0 5.0 5.0 10.0 G-1 44 G-2 30 -CRUSHED STONE- Light brown poorly-graded SAND (SP), no structure, no odor, dry - GLACIOFLUVIAL DEPOSITS - Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry BOTTOM OF EXPLORATION 10.0 FT Note: Exploration backfilled upon completion. 222.5 0.5 213.0 10.0 SP SP 5 5 20 5 50 30 20 55 5 5 C. Cravinho Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 10.0 Elevation Location GP-01 Time (hr.) GP-01 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G2 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 23 June 2025 - - - - G - Geoprobe 23 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 223.0 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 151
0.0 5.0 5.0 10.0 G-1 38 G-2 33 -CRUSHED STONE- Dark brown silty SAND (SM), no structure, no odor, dry - FILL - Light brown poorly-graded SAND (SP), no structure, no odor, dry - GLACIOFLUVIAL DEPOSITS - Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry BOTTOM OF EXPLORATION 10.0 FT Note: Exploration backfilled upon completion. 222.0 0.5 221.0 1.5 212.5 10.0 SM SP SP 10 5 5 10 20 5 30 50 40 30 20 45 20 5 5 C. Cravinho Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 10.0 Elevation Location GP-02 Time (hr.) GP-02 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G2 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 23 June 2025 - - - - G - Geoprobe 23 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 222.5 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 152
0.0 5.0 5.0 10.0 G-1 40 G-2 60 -CRUSHED STONE- Tan to light brown poorly-graded SAND with silt (SP-SM), no structure, no odor, dry -FILL- Light brown sandy SILT (ML), no structure, no odor, dry, occasional dark soil lense, appears to be fill or former topsoil/loess soil horizon -GLACIOFLUVIAL DEPOSITS- BOTTOM OF EXPLORATION 10.0 FT Note: Exploration backfilled upon completion. 222.5 0.5 218.0 5.0 215.5 7.5 213.0 10.0 SP- SM ML 5 20 45 10 20 30 10 60 C. Cravinho Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 10.0 Elevation Location GP-03 Time (hr.) GP-03 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G2 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 23 June 2025 - - - - G - Geoprobe 23 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 223.0 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 153
0.0 5.0 5.0 10.0 G-1 38 G-2 40 -CRUSHED STONE- Dark brown silty SAND with gravel (SM), no structure, no odor, dry - FILL - Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry - GLACIOFLUVIAL DEPOSITS - Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry BOTTOM OF EXPLORATION 10.0 FT Note: Exploration backfilled upon completion. 221.5 0.5 219.0 3.0 212.0 10.0 SM SP SP 5 10 5 5 10 20 20 25 50 50 30 20 20 20 5 5 C. Cravinho Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 10.0 Elevation Location GP-04 Time (hr.) GP-04 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G2 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 23 June 2025 - - - - G - Geoprobe 23 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 222.0 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 154
0.0 5.0 5.0 10.0 G-1 39 G2 40 -CRUSHED STONE- Dark brown silty SAND with gravel (SM), no structure, no odor, dry, trace organic wood material - FILL - Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry - GLACIOFLUVIAL DEPOSITS - Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry BOTTOM OF EXPLORATION 10.0 FT Note: Exploration backfilled upon completion. 222.5 0.5 221.5 1.5 213.0 10.0 SM SP SP 5 5 10 5 5 10 20 20 25 50 45 30 20 20 20 5 5 C. Cravinho Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 10.0 Elevation Location GP-05 Time (hr.) GP-05 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G2 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 23 June 2025 - - - - G - Geoprobe 23 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 223.0 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 155
0.0 5.0 5.0 10.0 G-1 39 G-2 35 -CRUSHED STONE- Light brown poorly-graded SAND with silt (SP-SM), no structure, no odor, dry - GLACIOFLUVIAL DEPOSITS - Light brown poorly-graded SAND (SP), no structure, no odor, dry BOTTOM OF EXPLORATION 10.0 FT Note: Exploration backfilled upon completion. 222.5 0.5 213.0 10.0 SP- SM SP 5 5 20 20 45 40 20 35 10 C. Cravinho Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 10.0 Elevation Location GP-06 Time (hr.) GP-06 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G2 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 23 June 2025 - - - - G - Geoprobe 24 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 223.0 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 156
0.0 5.0 5.0 10.0 G-1 34 G-2 60 -CRUSHED STONE- Dark brown silty SAND with gravel (SM), no structure, no odor, dry - FILL - Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry - GLACIOFLUVIAL DEPOSITS - Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry BOTTOM OF EXPLORATION 10.0 FT Note: Exploration backfilled upon completion. 222.5 0.5 222.0 1.0 213.0 10.0 SM SP SP 5 10 5 5 10 5 5 25 55 45 30 30 45 20 5 C. Cravinho Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 10.0 Elevation Location GP-07 Time (hr.) GP-07 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G2 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 23 June 2025 - - - - G - Geoprobe 23 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 223.0 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 157
0.0 5.0 5.0 10.0 G-1 36 G-2 30 -CRUSHED STONE- Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry - GLACIOFLUVIAL DEPOSITS - Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry BOTTOM OF EXPLORATION 10.0 FT Note: Exploration backfilled upon completion. 222.5 0.5 213.0 10.0 SP SP 5 5 5 55 45 30 50 5 C. Cravinho Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 10.0 Elevation Location GP-08 Time (hr.) GP-08 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G2 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 23 June 2025 - - - - G - Geoprobe 23 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 223.0 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 158
0.0 5.0 5.0 10.0 G-1 41 G-2 33 -CRUSHED STONE- Dark brown silty SAND with gravel (SM), no structure, no odor, dry - FILL - Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry - GLACIOFLUVIAL DEPOSITS - Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry BOTTOM OF EXPLORATION 10.0 FT Note: Exploration backfilled upon completion. 222.0 0.5 220.0 2.5 212.5 10.0 SM SP SP 5 10 5 5 10 5 5 25 55 55 30 30 30 20 5 5 C. Cravinho Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 10.0 Elevation Location GP-09 Time (hr.) GP-09 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G2 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 23 June 2025 - - - - G - Geoprobe 23 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 222.5 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 159
0.0 5.0 5.0 10.0 G-1 41 G-2 55 - TRACK RUBBER AND ASPHALT - -CRUSHED STONE- Gray to gray-brown silty SAND with gravel (SM), no structure, no odor, dry - FILL - Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry - GLACIOFLUVIAL DEPOSITS - Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry BOTTOM OF EXPLORATION 10.0 FT Note: Exploration backfilled upon completion. 222.9 0.1 222.5 0.5 222.0 1.0 213.0 10.0 SM SP SP 15 10 5 5 15 5 5 20 55 55 25 30 30 15 5 5 C. Cravinho Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 10.0 Elevation Location GP-10 Time (hr.) GP-10 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G2 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 24 June 2025 - - - - G - Geoprobe 24 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 223.0 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 160
0.0 5.0 5.0 10.0 G-1 40 G-2 50 - TRACK RUBBER AND ASPHALT - -CRUSHED STONE- Gray to gray-brown poorly-graded SAND with silt and gravel (SP-SM), no structure, no odor, dry - FILL - Red to red-brown poorly-graded SAND (SP), no structure, no odor, dry - GLACIOFLUVIAL DEPOSITS - Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry BOTTOM OF EXPLORATION 10.0 FT Note: Exploration backfilled upon completion. 221.9 0.1 221.5 0.5 221.0 1.0 212.0 10.0 SP- SM SP SP 10 5 15 10 5 15 5 5 20 45 55 30 30 30 10 5 5 C. Cravinho Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 10.0 Elevation Location GP-11 Time (hr.) GP-11 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G2 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 24 June 2025 - - - - G - Geoprobe 24 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 222.0 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 161
0.0 5.0 5.0 10.0 G-1 45 G-2 41 - TRACK RUBBER AND ASPHALT - -CRUSHED STONE- Gray to gray-brown poorly-graded SAND with silt and gravel (SP-SM), no structure, no odor, dry - FILL - Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry - GLACIOFLUVIAL DEPOSITS - Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry BOTTOM OF EXPLORATION 10.0 FT Note: Exploration backfilled upon completion. 221.9 0.1 221.5 0.5 220.0 2.0 212.0 10.0 SP- SM SP SP 15 20 5 5 15 5 5 25 55 45 15 30 40 10 5 5 C. Cravinho Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 10.0 Elevation Location GP-12 Time (hr.) GP-12 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G2 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 24 June 2025 - - - - G - Geoprobe 24 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 222.0 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 162
0.0 5.0 5.0 10.0 10.0 15.0 G-1 46 G-2 38 G-3 42 - TRACK RUBBER AND ASPHALT - -CRUSHED STONE- Gray to gray-brown poorly-graded SAND with silt and gravel (SP-SM), no structure, no odor, dry Tan to light-brown silty SAND (SM), no structure, no odor, dry, frequent pockets of dark brown organic soil -FILL- Brown silty SAND (SM), no structure, no odor, moist Tan to light brown poorly-graded SAND (SP), no structure, no odor, moist -GLACIOFLUVIAL DEPOSITS- Brown silty SAND (SM), no structure, no odor, moist Tan to light brown poorly-graded SAND (SP), no structure, no odor, moist BOTTOM OF EXPLORATION 15.0 FT Note: Exploration backfilled upon completion. 222.5 0.5 222.0 1.0 218.0 5.0 213.0 10.0 210.0 13.0 209.0 14.0 208.0 15.0 SP- SM SP SM SM SP SM SP 15 5 20 5 5 5 5 15 5 5 5 40 25 55 50 20 40 20 30 15 30 20 40 30 40 20 10 5 20 40 20 40 C. Cravinho Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 15.0 Elevation Location GP-13 Time (hr.) GP-13 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G3 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 24 June 2025 - - - - G - Geoprobe 24 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 223.0 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 15 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test - FILL - Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry -FILL-
Page 163
0.0 5.0 5.0 10.0 G-1 43 G-2 40 - TRACK RUBBER AND ASPHALT - -CRUSHED STONE- Brown to red-brown poorly-graded SAND with gravel (SP), no structure, no odor, dry - FILL - Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry Tan to light brown poorly-graded SAND (SP), no structure, no odor, moist - GLACIOFLUVIAL DEPOSITS - Brown silty SAND (SM), no structure, no odor, moist Tan to light brown poorly-graded SAND (SP), no structure, no odor, moist BOTTOM OF EXPLORATION 10.0 FT Note: Exploration backfilled upon completion. 223.9 0.1 223.5 0.5 220.0 4.0 216.0 8.0 215.5 8.5 214.0 10.0 SP SP SP SM SP 15 20 5 5 5 15 5 5 5 25 55 50 20 50 15 30 35 40 35 10 5 5 40 5 C. Cravinho Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 10.0 Elevation Location GP-14 Time (hr.) GP-14 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G2 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 24 June 2025 - - - - G - Geoprobe 24 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 224.0 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 164
0.0 5.0 5.0 10.0 G-1 44 G-2 39 - TRACK RUBBER AND ASPHALT - -CRUSHED STONE- Gray-brown to red-brown poorly-graded SAND with silt and gravel (SP-SM), no structure, no odor, dry - FILL - Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry - GLACIOFLUVIAL DEPOSITS - BOTTOM OF EXPLORATION 10.0 FT Note: Exploration backfilled upon completion. 223.9 0.1 223.5 0.5 220.0 4.0 214.0 10.0 SP- SM SP SP 15 20 5 15 5 5 25 55 10 15 30 80 10 5 5 C. Cravinho Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 10.0 Elevation Location GP-15 Time (hr.) GP-15 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G2 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 24 June 2025 - - - - G - Geoprobe 24 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 224.0 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 165
0.0 5.0 5.0 10.0 10.0 15.0 G-1 43 G-2 42 G-3 45 - TRACK RUBBER AND ASPHALT - -CRUSHED STONE- Gray-brown to red-brown poorly-graded SAND with silt and gravel (SP-SM), no structure, no odor, dry - FILL - Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry - GLACIOFLUVIAL DEPOSITS - Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry BOTTOM OF EXPLORATION 15.0 FT Note: Exploration backfilled upon completion. 223.4 0.1 223.0 0.5 219.5 4.0 208.5 15.0 SP- SM SP SP SP 15 20 5 15 5 5 5 25 55 50 25 15 30 40 65 10 5 5 5 C. Cravinho Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 15.0 Elevation Location GP-16 Time (hr.) GP-16 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G3 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 24 June 2025 - - - - G - Geoprobe 24 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 223.5 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 15 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 166
0.0 5.0 5.0 10.0 G-1 40 G-2 35 - TRACK RUBBER AND ASPHALT - -CRUSHED STONE- Gray-brown to red-brown poorly-graded SAND with silt and gravel (SP-SM), no structure, no odor, dry - FILL - Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry - GLACIOFLUVIAL DEPOSITS - BOTTOM OF EXPLORATION 10.0 FT Note: Exploration backfilled upon completion. 223.4 0.1 223.0 0.5 219.5 4.0 213.5 10.0 SP- SM SP SP 15 20 5 15 5 5 25 55 50 15 30 40 10 5 5 C. Cravinho Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 10.0 Elevation Location GP-17 Time (hr.) GP-17 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G2 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 24 June 2025 - - - - G - Geoprobe 24 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 223.5 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 167
0.0 5.0 5.0 10.0 G-1 40 G-2 42 - TRACK RUBBER AND ASPHALT - -CRUSHED STONE- Gray-brown to red-brown poorly-graded SAND with silt and gravel (SP-SM), no structure, no odor, dry - FILL - Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry - GLACIOFLUVIAL DEPOSITS - BOTTOM OF EXPLORATION 10.0 FT Note: Exploration backfilled upon completion. 221.9 0.1 221.5 0.5 218.0 4.0 212.0 10.0 SP- SM SP SP 15 20 5 15 5 5 25 55 30 15 30 60 10 5 5 C. Cravinho Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 10.0 Elevation Location GP-18 Time (hr.) GP-18 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G2 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 24 June 2025 - - - - G - Geoprobe 24 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 222.0 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 168
0.0 5.0 5.0 10.0 G-1 46 G-2 40 - TRACK RUBBER AND ASPHALT - -CRUSHED STONE- Gray-brown to red-brown poorly-graded SAND with silt and gravel (SP-SM), no structure, no odor, dry - FILL - Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry Tan to light brown poorly-graded SAND (SP), no structure, no odor, dry - GLACIOFLUVIAL DEPOSITS - BOTTOM OF EXPLORATION 10.0 FT Note: Exploration backfilled upon completion. 222.9 0.1 222.5 0.5 219.0 4.0 213.0 10.0 SP- SM SP SP 15 20 5 15 5 5 25 55 50 15 30 40 10 5 5 C. Cravinho Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 10.0 Elevation Location GP-19 Time (hr.) GP-19 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G2 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 24 June 2025 - - - - G - Geoprobe 24 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 223.0 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 169
P U S H P U S H P U S H P U S H 0.0 5.0 5.0 10.0 10.0 15.0 15.0 20.0 G1 G2 G3 G4 -TRACK RUBBER AND ASPHALT- Dark gray to gray-brown poorly-graded SAND with silt and gravel (SP-SM), no structure, no odor Red-brown to tan poorly-graded SAND (SP), bedded, no odor, dry - FILL - Dark brown silty SAND with gravel (SM), no structure, no odor, dry, occasional irregular dark brown sandy SILT pocket (fill) Red-brown to tan poorly-graded SAND (SP), bedded, no odor, dry, trace clayey sand - GLACIOFLUVIAL DEPOSITS - Tan silty SAND (SM), no structure, no odor, moist BOTTOM OF EXPLORATION 20.0 FT Note: Exploration backfilled upon completion. 221.7 0.3 210.0 12.0 209.0 13.0 205.0 17.0 202.0 20.0 SP- SM SP SM SP SM 10 10 0 20 15 0 20 25 10 20 20 25 40 20 30 60 50 70 10 15 30 E. Robinson Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 20.0 Elevation Location GP-20 Time (hr.) GP-20 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G4 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 25 June 2025 - - - - G - Geoprobe 25 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 222.0 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 15 20 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 170
P U S H P U S H 0.0 5.0 5.0 10.0 G1 G2 -TRACK RUBBER AND ASPHALT- Dark gray to gray-brown poorly-graded SAND with silt and gravel (SP-SM), no structure, no odor - FILL - Red-brown to tan poorly-graded SAND (SP), bedded, no odor, dry - GLACIOFLUVIAL DEPOSITS - BOTTOM OF EXPLORATION 10.0 FT Note: Exploration backfilled upon completion. 221.6 0.4 221.2 0.8 212.0 10.0 SP- SM SP 10 5 20 20 20 20 25 20 50 10 E. Robinson Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 10.0 Elevation Location GP-21 Time (hr.) GP-21 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G2 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 25 June 2025 - - - - G - Geoprobe 25 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 222.0 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 171
P U S H P U S H 0.0 5.0 5.0 10.0 G1 G2 -TRACK RUBBER AND ASPHALT- Dark gray to gray-brown poorly-graded SAND with silt and gravel (SP-SM), no structure, no odor Red-brown to tan poorly-graded SAND (SP), bedded, no odor, dry - FILL - Dark brown sandy SILT (ML) with dark brown organic soil pockets, occasional wood pieces (from tree?) -FILL- BOTTOM OF EXPLORATION 10.0 FT Note: Exploration backfilled upon completion. 221.6 0.4 217.0 5.0 212.0 10.0 SP- SM SP ML 10 20 5 20 25 20 20 5 20 55 30 10 60 E. Robinson Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 10.0 Elevation Location GP-22 Time (hr.) GP-22 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G2 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 25 June 2025 - - - - G - Geoprobe 25 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 222.0 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 172
P U S H P U S H 0.0 5.0 5.0 10.0 G1 G2 -TRACK RUBBER AND ASPHALT- Dark gray and gray-brown poorly-graded SAND with silt and gravel (GW- GC), no structure, no odor - FILL - Red-brown to tan poorly-graded SAND with gravel (SP), bedded, no odor, dry - GLACIOFLUVIAL DEPOSITS - BOTTOM OF EXPLORATION 10.0 FT Note: Exploration backfilled upon completion. 221.7 0.3 221.0 1.0 212.0 10.0 GW- GC SP 10 5 20 10 20 25 20 20 20 40 10 E. Robinson Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 10.0 Elevation Location GP-23 Time (hr.) GP-23 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G2 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 25 June 2025 - - - - G - Geoprobe 25 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 222.0 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 173
P U S H P U S H P U S H 0.0 5.0 5.0 10.0 10.0 15.0 G1 G2 G3 -TRACK RUBBER AND ASPHALT- Dark gray to gray-brown poorly-graded SAND with silt and gravel (SP-SM), no structure, no odor - FILL - Red-brown to tan poorly-graded SAND with gravel (SP), bedded, no odor, dry - GLACIOFLUVIAL DEPOSITS - Red to red-brown poorly-graded SAND with gravel (SP), no structure, no odor, dry BOTTOM OF EXPLORATION 15.0 FT Note: Exploration backfilled upon completion. 222.1 0.4 221.5 1.0 207.5 15.0 SP- SM SP SP 10 5 20 10 20 20 20 25 20 40 100 10 E. Robinson Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 15.0 Elevation Location GP-24 Time (hr.) GP-24 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G3 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 25 June 2025 - - - - G - Geoprobe 25 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 222.5 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 15 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 174
P U S H P U S H P U S H 0.0 5.0 5.0 10.0 10.0 15.0 G1 G2 G3 -TRACK RUBBER AND ASPHALT- Dark gray to gray-brown poorly-graded SAND with silt and gravel (SP-SM), no structure, no odor - FILL - Red-brown to tan poorly-graded SAND (SP), bedded, no odor, dry, trace clayey sand, graded bedding coarse to fine sand - GLACIOFLUVIAL DEPOSITS - BOTTOM OF EXPLORATION 15.0 FT Note: Exploration backfilled upon completion. 222.2 0.3 221.5 1.0 207.5 15.0 SP- SM SP 10 0 20 0 20 10 20 40 20 50 10 E. Robinson Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 15.0 Elevation Location GP-25 Time (hr.) GP-25 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G3 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 25 June 2025 - - - - G - Geoprobe 25 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 222.5 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 15 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 175
P U S H P U S H 0.0 5.0 5.0 10.0 G1 G2 Dark gray to gray-brown poorly-graded SAND with silt and gravel (SP-SM), no structure, no odor - FILL - Red-brown to tan poorly-graded SAND (SP), bedded, no odor, dry, trace clayey sand, graded beds, coarse grain on top of fine grain - GLACIOFLUVIAL DEPOSITS - BOTTOM OF EXPLORATION 10.0 FT Note: Exploration backfilled upon completion. 221.5 1.0 212.5 10.0 SP- SM SP 10 0 20 0 20 10 20 40 20 50 10 E. Robinson Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 10.0 Elevation Location GP-26 Time (hr.) GP-26 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G2 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 25 June 2025 - - - - G - Geoprobe 25 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 222.5 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 176
P U S H P U S H 0.0 5.0 5.0 10.0 G1 G2 Dark gray to gray-brown poorly-graded SAND with silt and gravel (SP-SM), no structure, no odor - FILL - Red-brown to tan poorly-graded SAND with gravel (SP), bedded, no odor, dry - GLACIOFLUVIAL DEPOSITS - Red-brown to tan poorly-graded SAND (SP), bedded, no odor, dry, trace clayey sand BOTTOM OF EXPLORATION 10.0 FT Note: Exploration backfilled upon completion. 221.0 1.0 212.0 10.0 SP- SM SP SP 10 5 0 20 10 0 20 20 10 20 25 40 20 40 50 10 E. Robinson Casing Casing: PID Make & Model: Hoist/Hammer: Depth (ft) to: Sampler Overburden (ft) Rock Cored (ft) of Rig Make & Model: Grout Screen Well Diagram Geoprobe 7822DTG Sheet No. S - Splitspoon Sample O - Open End Rod T - Thin Wall Tube U - Undisturbed Sample File No. 10.0 Elevation Location GP-27 Time (hr.) GP-27 Inside Diameter (in.) H&A Rep. Plasticity: N - Nonplastic L - Low M - Medium H - High Dry Strength: N - None L - Low M - Medium H - High V - Very High NAVD88 - Date Push Bottom Filter Sand Dilatancy: R - Rapid S - Slow N - None Toughness: L - Low M - Medium H - High Cuttings Not used Samples G2 Datum Type Barrel - Water Concrete Hammer Fall (in.) Bentonite Seal 0.0 Finish Drilling Equipment and Procedures 25 June 2025 - - - - G - Geoprobe 25 June 2025 of Hole None Boring No. Driller Summary Field Tests: 1 Drill Mud: Hammer Weight (lb) -AUTO- See Plan B. Wilson Start 1 Bit Type: Bottom Winch Automatic hammer Time Water Level Data Note: Soil identification based on visual-manual methods of the USCS as practiced by Haley & Aldrich, Inc. Sample ID 1.5 of Casing Boring No. Geoprobe Spoon - Elapsed 0206711-001 Riser Pipe † Note: Maximum particle size is determined by direct observation within the limitations of sampler size. 222.0 (est.) Client Contractor G&M SUBSURFACE Project GRANBY PUBLIC SCHOOLS GRANBY PUBLIC SCHOOLS- TURF FIELD AND TRACK, GRANBY, CT GEOPROBE REPORT Sampler Blows per 6 in. Sample Depth (ft) H&A-GEOPROBE-09 PLOG-HA-LIB09-BOS STANDARD ONLY-MARCH 2024.GLB HA-TB+CORE+WELL-07-1.GDT \\HALEYALDRICH.COM\SHARE\CF\PROJECTS\0206711\GINT\2025\0206711-GP.GPJ 18 Jul 25 Depth (ft) 0 5 10 Sample No. & Rec. (in.) VISUAL-MANUAL IDENTIFICATION AND DESCRIPTION (Color, GROUP NAME, max. particle size † , structure, odor, moisture, optional descriptions GEOLOGIC INTERPRETATION) Stratum Change Elev/Depth (ft) USCS Symbol Gravel Sand Field Test % Fine % Coarse % Medium % Fine % Fines Dilatancy % Coarse Toughness Plasticity Strength Field Test
Page 177
GRANBY HIGH SCHOOL TRACK AND FIELD January 26, 2026
Page 178
EXISTING SITE GEOTECH REPORT - Recommends full depth removal and replacement down to 5’ and up to 10’ in some areas. - Reconstruction of this manner is very difficult and would require full removal the entire facility, including turf, track, pavement, drainage, all utilities, shoring of light poles, shoring for bleachers, site security, and only would come with a 1 year workmanship warranty
Page 179
PROPOSED SOLUTION POST TENSION CONCRETE TRACK AND FIELD STRUCTURALLY SOUND USED ON TRACKS, FIELDS, AND COURTS CAN BE COMPLETED IN ONE SEASON FULLY WARRANTED 50 YEAR STRUCTURAL WARRANTY
Page 180
CONSTRUCTION METHOD
Page 181
PROPOSED PLAN
Page 182
BASEBALL / MULTIPURPOSE FIELD
Page 183
BASEBALL / MULTIPURPOSE FIELD
Page 184
January 23, 2026 To ensure our upcoming CPPAC meeting is as productive as possible, we have provided answers to your preliminary list of questions below in GREEN . Chris Hulk, Regional Vice President for New England from Turf Field, will be joining the meeting to provide further information and details for the turf projects proposed for GMHS. General / All Projects Budgeting: Do the most recent request figures include contingencies and/or project management fees? Please see this pricing summary for the field projects. We do not have a comprehensive project developed for GMHS, so this is not available at this time. Recommended Contingency to be added: 8%–10% for design, general conditions, and construction to account for unknown site conditions. This does not include project management. *Football& Track Field *Stadium Field includes: boys/girls soccer, boys/girls lacrosse, ultimate frisbee, football, fieldhockey, boys/girls track&field, cheerleading, and unified sports) Full Site: Visual of all fields proposed . LED Lighting: We’ve discussed potential ROI within 3–5 years. Please be prepared to provide 2024–2025 high school energy costs (broken down by quarter). Are the lights primarily utilized during Q2 and Q3? With regard to the athletic lights, we do receive a separate electric bill for those lights. We keep track of the electricity data usage, and in reviewing the data, the most expensive months are September through December and then April to June. The following is the TOTAL annual usage of those lights, both supply and delivery. FY 2025 - $17,940 FY 2024- $15,540 FY 2023 - $17,120 FY 2022 - $16,020 The four-year average is $16,655. Safety Netting: This was included in the original quote—what were the considerations for its removal in the latest request? This was suggested as an add-on, it is not there because we are keeping costs down. The only "add-on" requested is LED lights. We put this as a separate line item just because of the costs. However, it is strongly recommended by the Field Turf professional that by adding netting, the track and field can be used at the same time.
Page 185
Exclusions: Please be prepared to review the FieldTurf "project exclusions" list with the committee to discuss potential impacts. EXCLUSIONS: ➢ Any costs associated with necessary charges relating to the delineation of the field ➢ The supply of manholes or clean-outs or grates, or the supply of the manhole covers outside of the field area ➢ Any alteration or deviation from specifications involving extra costs, which alteration or deviation will be provided only upon executed change orders, and will become an extra charge over and above the offered price ➢ Soil stabilization or remediation of any type ➢ Rock excavation or ledge removal ➢ Offsite disposal of generated spoils other than topsoil ➢ Taxes ➢ Excavation or disposal of unsuitable or contaminated soils ➢ Site security, including security fencing ➢ Once subgrade has been established, a proof roll will be performed to ensure structural stability of the soils; if unsuitable soils are encountered, a price to remedy these areas can be negotiated based on recommended methods per the project Engineer ➢ Testing or Inspection Fees ➢ Site restoration, sodding, landscaping, or grow- in beyond disturbed areas ➢ Repair or resurfacing existing asphalt parking lot if damaged by truck traffic ➢ Bond fees and non-local permits Baseball & Softball Fields (and multipurpose outfield for soccer, lacrosse, and field hockey as needed) Scope & Design: Please provide site plans, location for the multi-purpose field, and details on expected student population usage. Please see the project proposal linked here . We can not go to RFP for a true project rendering until a vote is passed. Considering field use for Junior Varsity and Varsity teams for baseball and softball, and additional use for soccer and other sports for Freshman games, we anticipate 234 student athletes to use the stadium field and the baseball/multipurpose field each year over the life of the field .(including boys/girls soccer, boys/girls lacrosse, ultimate frisbee, football, fieldhockey, boys/girls track&field, cheerleading and unified sports) In addition, there is interest from Rovers, Little League, and men/women's recreational leagues to use the fields.
Page 186
We have an overall rendering in 2D for the site included in the project proposal linked here . If we engage in an initial 'pre-construction' / design agreement with Field Turf, we can include 3D renderings of the fields. That cost would be approximately $29.5k and is attached as a CREC Co Op Proposal. An example of a 3D rendering can be viewed here . Field Composition: What were the considerations regarding upgrading current fields versus new construction? Was a hybrid option (dirt infield/turf outfield) evaluated? Is there a comparative cost to revive the current fields with new infields and dugouts? The typical cost to do a new turf field versus renovating a grass field properly is about 20% more. The main driving factor used by industry professionals is the cost per hour of use. Grass fields are intended to be used 10-12 hours per week so that they can be maintained and preserved at a maintainable level. As indicated in the 2008 report ( section 1 , section 2 , section 3 ), this is not possible with the needs of our current baseball field. A turf field, especially with lights, allows 40+ hours of use a week. This then opens it up to use by Granby town teams, club teams, adult leagues, etc, that are not provided access to our grass fields now. So the cost per hour of use goes down to about 1/4 of the cost of a grass field when you do the life span analysis. Clay fields are not recommended. Reports from districts that have clay are dissatisfied due to tracking and marks in the field that look terrible and are very hard to repair. (Note: Connecticut Interscholastic Athletic Conference) Data and regional athletic trends suggest that approximately 10% to 15% of Connecticut high school baseball fields are currently synthetic turf.) We can not find this data point confirmed anywhere. In speaking with both Harford area superintendents and turf field professionals, they report a significant increase in the number of baseball fields being done in the last couple of years. This is due to the short spring season for spring sports and the negative impact of New England weather. The turf field would allow year-long use with no rest. We are currently gathering data from athletic directors across the state for accurate information on the number of turf fields. Glastonbury public schools just compiled a list for their project proposal and reported to the Glastonbury Board of Education that 28 out of 31 of the districts in their conference have at least one turf playing field. Environmental Impact: Are there any known environmental impacts of installing a new turf field? There is no impact. CTDEEP has various findings right on their website . Water coming from the field is filtered through the stone base and typically comes out cleaner from the site than what is found prior to installing turf. All FieldTurf materials will be PFAS-free starting in '26. We are preparing a more comprehensive package on turf fields for public consumption in the near future. Add-Ons & Maintenance: Are there "extras" (scoreboards, lights, fencing) required that aren't in the base quote? Additionally, what are, if any, the recurring maintenance costs for these fields? Turf Field Co. provides the equipment and training for Granby Public Schools staff to complete maintenance independently. There are also options to have a service plan where Field Turf would provide
Page 187
professional services, which is approximately$3,500 per year per field. For multiple fields, we would receive a discount, so the overall cost would be approximately $8,500 per year. Existing Equipment: Does the quote include the grandstand seating shown in the overview? Regarding the scoreboard, was a new one considered, or is the current one reusable? Nothing new is included; these are all optional add-ons. The base price is generally rebuilding the field... fence line and inside. Everything outside of that would be an add-on. We try to structure the pricing as "need to have" versus "nice to have". Timeline & Exclusions: Exclusions are answered above. The full report can be viewed here . What is the estimated completion timeline? From Field Turf professionals: “Generally, each field would be 3-4 months. However, with various fields on one side, we can move crews from one field to the next in a staggered manner to get that timeframe down. We would suggest starting the Stadium Field in May, so it is complete for mid-August. The second field would be replaced after school is over, so you have facilities available during the full year. And then baseball would be done in the late summer /fall. The full project would be May - Early December. GMMS Architectural Fees: Can you walk the committee through the methodology used to arrive at the $1.75M quote for architectural design ? If this includes repairs, please outline. In our previous CPPAC Discussion Memo (linked here) We state: “Specific HVAC assessment will be complete in April of 2026. In addition, the Board of Education will contract for a comprehensive Facilities Conditions Assessment to determine priorities and engage in architectural plans for future consideration.” This is now scheduled for February 17th and 18th. “In reliance upon previously done repairs and the visual assessment, the estimate at this time to conduct necessary repairs and engage with an architectural design firm is $1.75 Million.” Terracon Estimate: The report identifies $3.1M in total replacement costs over 10 years, with $1.69M labeled as "immediate." Is the current recommendation to defer all of these items? If so, please be prepared to discuss the rationale. As we have shared previously, a visual inspection of GMMS was done as an initial look at the building. We have now completed the necessary ed specifications meetings, and that report is being compiled now. We have an HVAC inspection being conducted over the April school break, and we have a Full Facilities Conditions Assessment being conducted over the long Presidents' weekend in February. There is a comprehensive enrollment study being presented at the February 18th BOE meeting. These final reports are essential to provide the necessary information to inform any projects- repairs or renovations to GMMS.
Page 188
G R A N B Y G R A N B Y 3 1 2 5 4 c 50 SEATS c 3 1 2 5 4 c 50 SEATS c 3 12 5 4 c 50 SEATS c 0'40'160' SCALE: 1"=80' 80' GRANBY MEMORIAL HIGH SCHOOL ATHLETIC FACILITIES 39 SCHOOL STREET GRANBY, CONNECTICUTACHUSETTSAPRIL 15, 2025 FULL SITE Drawing: P:\ESTIMATING\2024 BID ACTIVITY\CONNECTICUT\GRANBY\GRANBY HS CONCEPTS FINAL.DWG Layout Tab:FULL SITEPlotted by: T017224 On this date: Fri, 2025 April 18 - 10:40am NOTES: 1)ALL DESIGN AND EXISTING CONDITIONS MAPPING BASED ON AVAILABLE MAPPING AND SHOULD BE CONSIDERED APPROXIMATE. 2)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA AND REQUIRES A CERTIFIED FIELDTURF INSTALLER AND BUILDER TO IMPLEMENT THE PROPOSED CONDITIONS. 3)THIS DESIGN IS THE SOLE PROPERTY OF FIELDTURF, USA AND NO ATTEMPTS SHALL BE MADE TO DUPLICATE OR REPLICATE WITHOUT THE PREMISSION OF FIELDTURF. TRACK AND FIELD BASEBALL AND SOFTBALL FIELD 2 TENNIS
Page 189
DESIGN PROPOSAL
GRANBY MEMORIAL HIGH SCHOOL
ATHLETIC FACILITIES IMPROVEMENTS
Date: January 16, 2026
Prepared For: Christopher DeGray – Director of Facilities, Granby Public Schools
Prepared By: Andrew Dyjak – Regional Vice President, New England
Chris Hulk, PE – Director of Design and Construction, New England
Jonathan Luster, PE – Regional Construction Manager, New England
Address: Granby Memorial High School, 39 School Street, Granby, CT
Dear Mr. DeGray,
FieldTurf is pleased to present a comprehensive proposal for the enhancement of athletic facilities at the Granby
Memorial High School campus. This project aims to make significant improvements to various areas, including the
stadium field, baseball field, secondary rectangular field, and tennis courts. The overarching goal is to create state-of-
the-art facilities that maximize playability while minimizing impact on the surrounding areas.
FieldTurf pricing is based on the Capital Region Education Council (CREC) program. CREC is a member of The Association
of Educational Purchasing Agencies (AEPA) program. The AEPA is a purchasing co-op that provides member schools with
pre-determined preferential pricing by approved vendors. Since the product has already been bid at the national level,
individual schools do not have to duplicate the formal bid process. AEPA IFB #024-A.
Click on the following AEPA hyperlink for more information: AEPA IFB #24-A.
Scope of the Project:
The design proposal encompasses a comprehensive approach, delivering site plans tailored for each project. These
include a range of key sheets such as existing conditions and removals plans, layout and materials plans, grading and
utility plans, sediment and erosion control plans, and details and cross-sections as needed. Additionally, the proposal
involves assisting the school in the submission process to local regulatory agencies, with electronic copies of plans
provided by FieldTurf for regulatory applications.
Timeline and Deliverables:
FieldTurf commits to delivering site development plans for review with the school within 4 weeks of a signed contract.
Additionally, FieldTurf will work with the school to develop a timeline for submission to local regulatory agencies as
required.
Page 190
DESIGN PROPOSAL Commitment to Excellence: FieldTurf is dedicated to providing the highest level of service throughout the project, ensuring the creation of a new, state-of-the-art athletic facility for Granby. We look forward to the opportunity to collaborate on this exciting project. Should you have any questions or require further information, please do not hesitate to contact us. DESIGN PROPOSAL PRICING FieldTurf is committed to delivering a comprehensive design proposal that not only meets regulatory requirements but also aligns with the vision and needs of the school. Our goal is to ensure a smooth and efficient process, from design development to permit acquisition, ultimately providing the school with a detailed pricing proposal for their consideration. A) Athletic Fields Design, Permit Assistance, and Pricing a. Review of Existing Mapping i. Contact local regulatory agencies and utility providers to obtain available mapping. ii. Evaluation of existing mapping related to site development, utilities, and wetlands. b. Topographic and Planimetric Site Features Survey and Wetland Delineation i. Acquisition of partial site survey for key topographic and planimetric site features that are essential for the design-build and permit process. ii. Identification and mapping of the boundaries of wetland areas within the vicinity of the project sites and provide written report. c. Site Investigation i. Conduct a test pit program consisting of 4-5 test pits, per field, to determine existing soil characteristics as they pertain to the renovations to the facility. ii. Arrange for and procure a third-party TV inspection of key storm drainage lines. Assumed one-day evaluation of the existing system. iii. Evaluate the electrical capacity of the different fields to accommodate supplementary athletic field lighting. d. Site Evaluation and Budgeting i. Review findings of each site with the Board of Education, Field Committee, and key stake holders ii. Develop a priority list of site development improvements and determine which sites will be prioritized to require in depth site development plans and which site are suitable development descriptions. For example, a grass field may only require description of soil amendment rather than a set of site plans. e. Provide Permitting Plan Set i. Preparation of site development plans suitable for use in local regulatory approvals and CREC Co-Op pricing, including: 1. Title Sheet 2. Existing Conditions and Removals Plan
Page 191
DESIGN PROPOSAL
a. Depicting limits of clearing, materials to be moved or removed, and locations of
existing onsite fencing, utilities, etc.
3. Site Development Plan
a. Depicting athletic field limits, field access, schematic bleacher sizing, and walkways
as applicable.
b. Depicting stormwater requirements, field grades, site lighting, typical site cross
sections, underground field drainage system, and schematic electrical locations.
4. Sediment and Erosion Control Plan
5. Site Details
a. Depicting typical sections and details for curbs, piping systems, base sections, and
additional details as required for field installation.
f. Assist School in Acquiring Regulatory Permits
i. Provide electronic plans to the school for permit submissions.
ii. Attend up to (3) regulatory meetings with local authorities.
Total: $29,500.00
Please feel free to reach out to any member of our project team with questions about our offer:
Andrew Dyjak
Regional Vice President
(860) 333-7839
Andrew.Dyjak@Fieldturf.com
Christopher Hulk, PE
Director of Design and Construction
(203) 676-4445
Christopher.Hulk@Fieldturf.com
Jonathan Luster, PE
Regional Construction Manager
(860)227-4915
Jonathan.Luster@Fieldturf.com
Thank you again for your interest in FieldTurf, we look forward to working with you.
Per:
Marie-Christine Raymond, Director of Operations
FieldTurf USA, Inc. / Tarkett Sports Canada, Inc.
FieldTurf USA, Inc. holds the Cooperative Purchase contract, any PO for Contract must be made out to
FieldTurf USA, Inc. 175 N Industrial Blvd NE. Calhoun, GA 30701
If you have questions regarding the FieldTurf and Beynon SmartBuy Cooperative Purchasing Program, please contact Eric
Fisher at: Eric.Fisher@smartbuycooperative.com.
Page 192
DESIGN PROPOSAL Conditions Notwithstanding any other document or agreement entered into by FieldTurf in connection with the supply and installation only of its product pursuant to the present bid proposal, the following shall apply: a) The limits of the design provided by FieldTurf shall be for schematic design defined by the limits of turf installed, and areas immediately adjacent to the limits of turf in order to provide smooth transitions. b) This Design Services proposal and its acceptance is subject to strikes, accidents, delays beyond our control and force majeure; c) Final payment shall be upon the substantial completion of FieldTurf’s obligations; d) Accounts overdue beyond 30 days of invoice date will be charged at an interest rate of 1.5% per month (19.56% per annum); e) This proposal is based on a single mobilization. If the site is not ready and additional mobilizations are necessary, additional charges will apply. f) FieldTurf shall be entitled to recover all costs and expenses, including attorney fees, associated with collection procedures in the event that FieldTurf pursues collection of payment of any past due invoice. g) Survey, stormwater reports, geotechnical services, design of special structures and Special studies such as Environmental Assessments, tree surveys, etc. (if required) shall be provided by others. h) Important Note Regarding Lump Sum Agreements: This paragraph is only applicable to the portion of this agreement captioned as a “Lump Sum.” Fees indicated in any lump sum/fixed-fee agreement reflect one (1) initial meeting with the client prior to submittal, one (1) drawing revision based on comments generated before or during that initial meeting, and one (1) informal meeting with the Local Permitting Authority. Additional meetings and revisions beyond those indicated above (including client meetings, consultant meetings and site visits) are considered additional services that will be billed in accordance with the hourly rate provisions set forth above. These services and fees shall be considered above and beyond the stated lump sum amount indicated in the contract. i) Important Note Regarding Construction Administration: Once permits and approvals (i.e. clearing, grading, surveying, staking, demolition, or construction) are granted for development related activity, FieldTurf reserves the right to conduct the necessary construction administration for the site. Plans, reviews, site visits, testing, as- built coordination, details, and plan revisions associated with this work will be conducted without need for authorization. In the event that the Client elects to contract with a Builder/Installer who is not either a) FieldTurf, or b) a FieldTurf certified builder, prior to permits being applied for, the following actions will be taken: 1) FieldTurf will deliver all final design document to the Client for their use; 2) The Engineer of Record will remove their stamp and be fully relieved of any liability with regard to the design; 3) The Client will fully relieve FieldTurf of any liability with regard to the design.
Page 193
DESIGN PROPOSAL 4) If permits have been applied for: FieldTurf and its sub-consultants will remove FieldTurf name and notify the Local Permitting Jurisdictions that it (they) will no longer be a party to the permit application, and it will be the responsibility of the Client to file the necessary change of status paperwork along with their selected Engineer of Record. j) Important Note Regarding Extra Work: During the course of the construction phase of the project, should work additional to that defined above be required, the client will be provided a written scope of work addressing the anticipated services required. Written approval of that work will be required prior to commencement of the work. That work will then proceed on an hourly basis in accordance with the attached rate sheet or on a negotiated, lump sum fee basis. k) Reimbursable Expenses: In addition to the above fees for engineering services, FieldTurf will invoice for reimbursable services, such as plotting, postage, survey, express delivery charges, travel related expense over and above that specifically stated above, etc. Reimbursable will appear as Additional Services on the monthly invoices and shall be in accordance with the attached fee schedule and based on actual usage. We suggest budgeting $1,500 for this item. EXCLUSIONS: ➢ Full electrical design and plans ➢ Design of renovations to existing septic or sanitary systems ➢ Traffic study or evaluations of traffic controls ➢ Design of special features, such as but not limited to, press box, buildings, bridges, culverts, etc… ➢ Non-local regulatory permits ➢ Geotechnical investigation and design ➢ A-2 and/or full T-2 Surveys for full site. Partial T-2 survey included for key areas. ➢ Design of features outside items shown or listed on concept plan
Page 194
DESIGN PROPOSAL
PROPOSAL ACCEPTANCE SHEET
The outlined Proposal has been reviewed and accepted to all portions hereinbefore listed, and is authorized to form as a
binding Contractual Agreement between FieldTurf USA, Inc. (“FieldTurf”) and the client identified below (“Client”).
Identifying information for the parties is as follows:
Client: Granby Public Schools
Project Name: Athletic Facilities Improvements – Granby Memorial High School
Project Location: Granby Memorial High School, Granby, CT
FIELDTURF USA, INC.
By: _____________________________ ________________________________
Name Title
Date: ___________________________
Granby Public Schools
By: _____________________________ ________________________________
Name Title
Date: ___________________________
Please sign and return this executed original letter to our office. This proposal is valid for a period of 30 days from the
date of issue.
Page 195
DESIGN PROPOSAL RATE SCHEDULE Design Consultant, Principal Design Consultant ......................................................... $ 185.00/Hr. Principal Engineer .......................................................................................................... 185.00/Hr. Project Engineer ........................................................................................................... 145.00/Hr. Designer (E.I.T.) ............................................................................................................... 90.00/Hr. Draftsman/Designer (AutoCAD)……. ................................................................................ 80.00/Hr. Clerical ............................................................................................................................ 35.00/Hr. Landscape Architecture Principal .................................................................................. 150.00/Hr. Landscape Architecture Senior ...................................................................................... 135.00/Hr. Landscape Architecture Project ..................................................................................... 110.00/Hr. Landscape Architecture Apprentice ................................................................................ 75.00/Hr. Travel ........................................................................................................................ 65 cents/mile Office Staff ....................................................................................................................... 50.00/Hr. Postage, Shipping, Telephone, Fax, etc. .................................................................... cost plus 15% Printing/Plotting .......................................................................................................... 50 cents/SF Reproductions and Reprographics .............................................................................cost plus 15% Subconsultants ...........................................................................................................cost plus 15% Rates shown are effective as of January 1, 2023 and through the remainder of the calendar year. They also apply for the full term of all contracts signed during 2023, unless stated otherwise in specific contract documents.
Minutes: archived copy, SHA-256 36b936f6b174…. Agenda: archived copy, SHA-256 be070cfcde37…. Packet: kept offline, SHA-256 7364b7902ae1….