CT Public Docs Tracker

Towns / Granby / Inland Wetlands & Watercourses Commission / Feb 11, 2026

Inland Wetlands & Watercourses Commission, Feb 11, 2026

Granby minutes posted

Documents

TypeDocumentPagesOpen
minutes IWWC Minutes 2 PDF download · town site
agenda IWWC Agenda 1 PDF download · town site
packet IWWC Meeting Packet
Sanitized copy: scripts and attachments were removed and the result checked. The original is kept offline.
Not attached: this packet is 48 MB, too large to host here. Use the town site link.
254 town site

Summary of the minutes

AI-generated summary. Each line links to the PDF page it came from; check it before relying on it.

Read the official minutes (PDF, 2 pages) The PDF is the record; this summary is a guide to it.

The Commission approved the January 14, 2026 minutes and voted to receive the Simsbury Road Bridge permit application and schedule a public hearing for March 11, 2026. It also continued the 142R and 186 Case Street agenda item to the next regular meeting at the applicant's request.

Decisions (4) · all reported votes

  1. Approval of January 14, 2026 minutes
    Approved as presented
    Vote: Motion by F. Jones, second by S. Okie, voted 6-0-0 · p. 1
  2. Simsbury Road Bridge replacement over West Branch of Salmon Brook - Town of Granby permit request
    Application received and public hearing scheduled for the next regular meeting on March 11, 2026, at 7:00 p.m. due to public interest and significant impact
    Vote: Motion by V. Dirienzo, second by F. Jones, voted 6-0-0 · p. 1
  3. 142R and 186 Case Street - M. Reale c/o Scottinaleece, LLC (regulated activity without valid IWWC permit)
    Agenda item continued to the next regular meeting at the request of the attorney for the property owner; Dam Safety submission extended to 3/6/2026
    Vote: Motion by D. Tolli, second by F. Jones, voted 6-0-0 · p. 2
  4. Adjournment
    Meeting adjourned at 7:45 p.m.
    Vote: Motion by V. Dirienzo, second by N. Dethlefsen, voted 6-0-0 · p. 2

Also discussed (1)

  • Commissioner Reports: J. Laudati temporary structure and approved RFR amendment: K. Bednaz indicated that the approved RFR for the run-shed shed can be amended to reflect the addition of the temporary structure; no vote recorded · p. 2
Summary of the agenda: IWWC Agenda

AI-generated summary.

This is the agenda for the Granby Inland Wetlands and Watercourses Commission's February 11, 2026 hybrid meeting. It lists the minutes of January 14, 2026 for action, a permit request for the Simsbury Road Bridge replacement (to be received), and an agent update on 142R and 186 Case Street.

On the agenda (3)

  1. Action on the minutes of January 14, 2026 · p. 1
  2. Permit request: Simsbury Road Bridge replacement over the West Branch of Salmon Brook (Town of Granby): (to be received) · p. 1
  3. Agent Report: 142R and 186 Case Street (M. Reale c/o Scottinaleece, LLC), conducting a regulated activity without a valid IWWC permit; Dam Safety submission extended to 3/6/2026: (update) · p. 1

Full text of the documents

View the minutes PDF on this page (IWWC Minutes) Open the PDF
Text of the minutes (IWWC Minutes, 2 pages)

Page 1 · open in PDF

 
1 
MEETING MINUTES 
Town of Granby 
Inland Wetlands and Watercourses Commission 
Wednesday, February 11, 2026, at 7:00 pm 
 
PRESENT: Nick Dethlefsen, David Tolli, Susan Okie, John Laudati, Fred Jones, and Vickie 
Dirienzo 
ALSO PRESENT: IWWC Agent Kate Bednaz and Land Use Coordinator Renee Deltenre (Zoom) 
 
1. Call to Order 
Chair Laudati called the meeting to order at 7:01 p.m. 
 
2. Action on the minutes of January 14, 2026 
 
ON A MOTION by F. Jones seconded by S. Okie, the Commission voted 6-0-0 to approve 
the January 14, 2026, minutes as presented.  
 
3. Permit Requests 
a. Simsbury Road Bridge – Town of Granby – Permit request for the proposed 
Simsbury Road Bridge replacement over the West Branch of Salmon Brook within 
a regulated area.  
Engineer John Wengell of CHA Solutions was present on behalf of the town to discuss 
the application. The Town of Granby is seeking to replace the existing two-span, 111-
foot bridge, which was built in 1956. The current bridge has a curb-to-curb width of 22 
feet, carries bi-directional traffic in a northerly/southerly direction, and the width of the 
existing bank is 56 feet. J. Wengell ran through existing conditions and the proposed 
replacement. The new structure will be comprised of 48.5-inch-deep steel beams with a 
concrete deck, two, 10-foot travel lanes, and two, 5-foot shoulders. Curb-to-curb width 
will be 30 feet and overall length will be 105 feet with a 43-degree skew. J. Wengell 
noted that the existing center abutment will be removed, riprap will be placed along the 
substructure and toe boulders will be placed at the embankments.  
 
A plan overview was presented for the proposed traffic detour, water handling and site 
restoration, including total temporary and permanent wetland and watercourse impacts. 
The anticipated start date is spring of 2027, and selected trees must be cut prior to April 
14th due to ecological concerns. K. Bednaz provided some feedback on the application, 
and requested additional information on the dewatering staging area and discharge, 
wetland resource areas, the mean high-water line and how that elevation relates to the 
shelf being created, etc.  The Commission discussed whether to hold a public hearing on 
the application. 
 
ON A MOTION by V. Dirienzo seconded by F. Jones, the Commission voted 6-0-0 to 
receive the application and schedule a public hearing for the next regular meeting on 
March 11, 2026, at 7:00 p.m. due to public interest and significant impact. 
 
  

Page 2 · open in PDF

 
2 
4. Agent Report and Correspondence 
a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – 
Conducting a Regulated Activity without a valid IWWC Permit. Dam Safety 
submission extended to 3/6/2026.   
Attorney Timothy Furey was present on behalf of the property owner to provide updates. 
He stated that many of the items necessary to correct the violation and satisfy 
requirements of DEEP and the Town are on hold due to the weather. In addition to Soil 
Scientist David Lord, the property owner has retained Kratzert Jones & Associates, Inc. 
to complete mapping pertaining to the pond and impoundment, and Karl Acimovic, P.E. 
& L.S. to assist with the requirements outlined by DEEP. Attorney Furey will continue to 
work with Attorney Brooks and requested to continue this agenda item to the next 
meeting so that updates can be presented to the Commission. Other than maintaining 
erosion and sediment control measures, no work is occurring onsite. Attorney Furey 
stated for the record that the Law Firm of Murphy, Laudati, Kiel & Rattigan, LLC, 
represented the sale of this property and the potential for a conflict of interest for J. 
Laudati should be evaluated.  
 
ON A MOTION by D. Tolli seconded by F. Jones, the Commission voted 6-0-0 to 
continue this agenda item to the next regular meeting.  
 
5. Commissioner Reports and Correspondence 
J. Laudati indicated that he recently installed a temporary structure on his property to provide 
shelter for his animals, as they are unable to use the existing run-shed shed due to weather 
conditions. K. Bednaz indicated that the approved RFR for the run-shed shed can be 
amended to reflect the addition of the temporary structure.   
 
6. Adjourn 
 
ON A MOTION by V. Dirienzo seconded by N. Dethlefsen, the Commission voted 6-0-0 to 
adjourn the meeting at 7:45 p.m. 
 
Respectfully submitted, 
 
 
 
Renee Deltenre 
Land Use Coordinator 
 
View the agenda PDF on this page (IWWC Agenda) Open the PDF
Text of the agenda (IWWC Agenda, 1 page)

Page 1 · open in PDF

 
Please note: Any person who wishes to provide materials for display on the video monitors at an IWWC meeting where such 
monitors are being used to videoconference the meetings must email the materials no later than 10 AM on the day of the meeting. 
All materials must be contained in a single attachment to the email.  Materials received after the 10 AM deadline will not be 
accepted for display. Display of the materials is subject to all other rules and procedures of the IWWC. Zip drive, memory sticks 
and other data storage devices will not be accepted. 
AGENDA 
Regular Hybrid Meeting 
Town of Granby 
Inland Wetlands and Watercourses Commission 
Wednesday, February 11, 2026, at 7:00 pm 
Town Hall Meeting Room 
 
Live Stream Under “Shows and Spotlight”: www.gctv16.org 
Zoom: https://us02web.zoom.us/j/89675080345?pwd=XpZISGMbRaEVkC0gxggagOOCI3cUqh.1 
Call In: 929-205-6099 
Meeting ID: 896 7508 0345 
Passcode: 717619 
 
1. Call to Order 
 
2. Action on the minutes of January 14, 2026 
 
3. Permit Requests 
a. Simsbury Road Bridge – Town of Granby – Permit request for the proposed Simsbury 
Road Bridge replacement over the West Branch of Salmon Brook within a regulated area. 
(To be received)  
 
4. Agent Report and Correspondence 
a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a 
Regulated Activity without a valid IWWC Permit. Dam Safety submission extended to 
3/6/2026.   
 
5. Commissioner Reports and Correspondence 
 
6. Adjourn 
Text of the packet (IWWC Meeting Packet, 254 pages)

Page 1

 
Please note: Any person who wishes to provide materials for display on the video monitors at an IWWC meeting where such 
monitors are being used to videoconference the meetings must email the materials no later than 10 AM on the day of the meeting. 
All materials must be contained in a single attachment to the email.  Materials received after the 10 AM deadline will not be 
accepted for display. Display of the materials is subject to all other rules and procedures of the IWWC. Zip drive, memory sticks 
and other data storage devices will not be accepted. 
AGENDA 
Regular Hybrid Meeting 
Town of Granby 
Inland Wetlands and Watercourses Commission 
Wednesday, February 11, 2026, at 7:00 pm 
Town Hall Meeting Room 
 
Live Stream Under “Shows and Spotlight”: www.gctv16.org 
Zoom: https://us02web.zoom.us/j/89675080345?pwd=XpZISGMbRaEVkC0gxggagOOCI3cUqh.1 
Call In: 929-205-6099 
Meeting ID: 896 7508 0345 
Passcode: 717619 
 
1. Call to Order 
 
2. Action on the minutes of January 14, 2026 
 
3. Permit Requests 
a. Simsbury Road Bridge – Town of Granby – Permit request for the proposed Simsbury 
Road Bridge replacement over the West Branch of Salmon Brook within a regulated area. 
(To be received)  
 
4. Agent Report and Correspondence 
a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a 
Regulated Activity without a valid IWWC Permit. Dam Safety submission extended to 
3/6/2026.   
 
5. Commissioner Reports and Correspondence 
 
6. Adjourn 

Page 2

Page 3

 
1 
MEETING MINUTES 
Town of Granby 
Inland Wetlands and Watercourses Commission 
Wednesday, January 14, 2026, at 7:00 pm 
 
PRESENT: Nick Dethlefsen, Dave Tolli, Sue Okie, John Laudati, Fred Jones, and Aurelle Locke 
PRESENT VIA ZOOM: Vickie Dirienzo 
ALSO PRESENT: IWWC Agent Kate Bednaz, Director of Community Development Abby Kenyon 
 
1. Call to Order 
Chair Laudati called the meeting to order at 7:01 p.m. 
 
2. Action on the minutes of December 10, 2025 
 
ON A MOTION by A. Locke, seconded by F. Jones, the Commission voted 6-0-0 to approve the December 
10, 2025, minutes as presented.  
 
3. Town Attorney Presentation re: Land Use Commission Training 
Attorneys Rich Roberts and Ken Slater presented to the Commission. The presentation included an overview 
of the Inland Wetlands and Watercourses Act, Commission jurisdiction, and enforcement procedures. An 
overview of meeting and hearing procedures was also provided, including when a public hearing is required, 
procedures for site visits, and information about ex-parte communication. The presentation included 
information about feasible and prudent alternatives and the basis for Commission decisions. The presentation 
was followed by Commissioner questions and answers. 
 
4. Enforcement Order 
a. 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated Activity 
without a valid IWWC Permit.  
K. Bednaz reported that at the last meeting, the property owner’s attorney cited the Wray case, noting that the 
IWWC enforcement is put on hold while DEEP determines their jurisdiction over the dam. The Town 
Attorney was consulted, and a memo included in the meeting packet. Per the Town Attorney’s memo, the 
IWWC can maintain jurisdiction over the activities conducted on the property, with the exception of the dam, 
while DEEP considers that. It was staff’s recommendation that the Enforcement Order be modified to remove 
reference to the dam, so the IWWC can continue enforcement activities on the other site activities that have 
occurred. 
 
The Commission reviewed the November 5, 2025 Enforcement Order and discussed items #1 and #2 in detail. 
It was decided to modify item #1 to exclude items related to the dam construction that may be under DEEP’s 
jurisdiction and to put item #2 on hold pending DEEP’s determination of jurisdiction. For item #1, the 
following language was suggested to be added, “Evaluations associated with the earthen dam and associated 
water control structure, including any directly adjacent resource areas may be addressed upon DEEP’s 
pending review of the dam structure and its jurisdiction. If the dam is deemed by DEEP to be subject to 
municipal review, all information as outlined in item #1 of this enforcement order must be submitted within 
30 days of the notification of DEEP’s decision.” 
 
ON A MOTION by S. Okie, seconded by A. Locke, the Commission voted 5-0-1 to modify item #1 in the 
Enforcement Order issued November 5, 2025 to add the revised language as discussed. D. Tolli abstained. 
 
ON A MOTION by S. Okie, seconded by F. Jones, the Commission voted 6-0-0 to put a stay on item #2 in 
the Enforcement Order issued November 5, 2025 pending DEEP’s review of jurisdiction.  

Page 4

 
2 
 
5. Agent Report and Correspondence 
a.  65 Cider Mill Heights – N. Goggin c/o Pool Boy Pools – Permit request to install a 28’ x 44’ inground 
swimming pool inclusive of patio and associated site improvements within a regulated area. Authorized 
Agent approval 1/7/26. 
K. Bednaz reported that an application to construct an inground pool was approved for 65 Cider Mill Heights. 
The approval includes a patio around the pool, fence, and other associated pool equipment. She reported that 
the proposed pool is located to the rear of the house in an area that is currently lawn. The location is in the 
upland review area. K. Bednaz reported that there will be E&S measures in place. In response to questions, 
K. Bednaz explained that a concern with pools in the upland review area can be the discharge/emptying of 
the pool and impact of chlorine and pool chemicals on the resource area. It was noted in this case this could 
be done to the front of the house and the pool water could infiltrate the soil. In response to a question about 
chemical storage, it was noted that the property owner will most likely store these inside a structure and they 
won’t be exposed to the elements. 
 
K. Bednaz reported that she visited Station 280, 280 Salmon Brook Street, site in December. Debris and 
garbage had been removed. Another site walk will be schedule for the spring to close out the project. 
 
K. Bednaz reported that a potential applicant met informally with the Planning and Zoning Commission to 
discuss potential development plans for 37 Hartford Avenue. K. Bednaz has been in contact with the potential 
applicant and referred them to the application file to review previous submissions. K. Bednaz reported that 
the potential applicant asked about an informal discuss with the Commission. It was noted that an informal 
discussion may be held once more concrete plans are developed and the effluent information from the septic 
system is determined. 
 
6. Commissioner Reports and Correspondence 
N. Defthlefsen noted that he read an article about the solar project on the Monrovia property and plans for 
horizontal drilling. In response to a question, A. Kenyon noted that project will be submitted to the Siting 
Council and the Town will have an opportunity to review the plans. No plans have been submitted at this 
time. 
 
7. Adjourn 
 
ON A MOTION by S. Okie seconded by F. Jones, the Commission voted 6-0-0 to adjourn the meeting at 
8:32 p.m. 
 
Respectfully submitted, 
 
 
 
Abby Kenyon 
Director of Community Development 

Page 5

Page 6

Page 7

Page 8

Page 9

Page 10

Federal Local Bridge Program: Bridge No. 04525  
Town of Granby IWWC Permit 
February 2026 
CT DEEP Reporting Form

Page 11

Page 12

Federal Local Bridge Program: Bridge No. 04525  
Town of Granby IWWC Permit 
February 2026 
Project Description 

Page 13

Federal Local Bridge Program: Bridge No. 04525  
Town of Granby IWWC Permit 
February 2026 
1 
 
PROJECT DESCRIPTION  
State P.E. Project Number:    0055-0145  
State Construction Project Number:    0055-0145  
Town/City:  Granby  
Bridge Number:  04525 Simsbury Road over the West Branch of Salmon Brook  
 
Project Need and Description:    
Bridge No. 04525 was originally constructed in 1956. The existing bridge is a two-span structure comprised of five 
prestressed concrete I-beams with concrete deck supported on full height concrete abutments with spread footings 
founded on bedrock. The bridge is located approximately 1,000’ north of Firetown Road in the Town of Granby. 
The structure features a 43-degree skew with each span measuring 50’-10” between center line of bearings and an 
overall length of 111-0”. The out-to-out width of the bridge is 25’-6” and the bridge’s roadway curb-to-curb width 
is 22’-0”. The two-lane roadway is classified as a Rural Minor Collector, and the average daily traffic is 1,300 
vehicles (2022) with 3.6% truck traffic as reported on the CTDOT “Traffic Monitoring Count Data” web page. 
The replacement of Bridge No. 04525 is necessary based on its substandard roadway width. The deck geometry 
rating of 3 indicates that the structure is not wide enough to accommodate the recorded ADT.  With approximately 
70 years since construction, the bridge has reached the end of its 50-75 service life. Additionally, prestressing strands 
at the ends of the concrete I-beams are exposed and rusted, the abutment and pier concrete bearing pads have large 
spalls and hollow areas, and the bridge rail does not meet current safety standards.  
Bridge No. 04525 is currently in the semi-final engineering phase under the Connecticut Department of 
Transportation (CTDOT) Federal Local Bridge Design Managed by State Program for structures requiring 
rehabilitation.  
 
Mapping:   
Site maps are attached.  
 
Photos:    
Site photos are attached.  
 
Proposed Project:    
The proposed project will include the full replacement of the existing bridge with a new superstructure, providing 
two 10-foot travel lanes and two 5-foot shoulders (to accommodate bike lanes at the Town’s request) for a curb-to-
curb width of 30 feet. The new 105’-0” single span superstructure will be comprised of metallized steel girders with 
a reinforced concrete deck and supported by reinforced concrete abutments and wingwalls. The proposed single span 
meets the 1.2 bankfull width requirement and proposes removing the pier from the watercourse. The southerly 
abutment will be supported by micropiles rock socketed into bedrock, while the northerly abutment will be founded 
directly on bedrock. New open bridge rail and approach guiderails that meet current safety standards will be installed. 
Approximately 100 feet of mill & overlay and 925 feet of full depth pavement reconstruction at the approaches is 
also proposed, most notably to remedy substandard highway deficiencies at the curve just north of the bridge. 
The existing pier, abutments and wingwalls will be removed in their entirety. A double row of toe boulders is 
proposed to line the streambank where the pier is removed and will tie into existing grade both upstream and 
downstream of the new bridge. Riprap scour protection will be proposed for the abutments and embankments and 
will consist of a 36” deep layer of standard riprap. This riprap will be buried with one foot of natural streambed 
material below the ordinary-high-water line along the southerly abutment. The proposed riprap along the 
embankments will be top dressed with natural material as requested by the National Park Service (NPS) and CT 

Page 14

Federal Local Bridge Program: Bridge No. 04525  
Town of Granby IWWC Permit 
February 2026 
2 
 
DEEP Fisheries. Deposited material underneath the bridge and streambed material will be stockpiled and re-used 
after grading. Disturbed areas will be topsoiled seeded and for slopes 3:1 or steeper erosion control matting will be 
installed for erosion protection. Native tree and shrub species will be  planted in the disturbed areas as well as wetland 
and conservation seed mixes. The wetland seed mix is proposed for areas disturbed within the wetlands and the 
conservation seed mix will be proposed for areas above the wetland limits along the embankments and roadway. For 
areas directly adjacent to maintained residential lawns, a lawn mixed will be proposed. 
 
Environmental Resources:    
A certified soil scientist has delineated wetlands to map the limits of state and federally regulated wetlands at the 
project site (Please refer to the attached Soils Report). The project site is located within a Natural Diversity Database 
screening area per December 2025 mapping and CT DEEP Best Management Practices (BMPs) will be incorporated 
into the contract documents. The West Branch of the Salmon Brook at Bridge No. 04525 is part of the West Branch 
Salmon River Sub-Regional Basin No. 4319 which has a drainage area of approximately 16 square miles. This river 
is also a part of the National Wild and Scenic River system. The ground water supply surrounding the structure is 
classified GA whose designated uses are existing private and potential public or private supplies suitable for drinking 
without treatment. The surface water in the structure’s vicinity is designated as Class A, is suitable for fish, and other 
aquatic life and wildlife; potential drinking water supplies; recreation; navigation; and water supply for industry and 
agriculture.  
 
Floodplain: 
A FEMA Floodplain Zone AE is present upstream of the structure however limit of detailed study ends just before 
the bridge.  The floodplain exhibited in the permit plans is the Existing 100-Year Flood Elevation (Calculated). 
 
Stormwater (ground disturbance): 
Ground disturbance is anticipated to be greater than one acre due to planned roadway reconstruction, temporary 
utility relocation, and planned water handling. A debris shield will be installed for the removal of the superstructure. 
Temporary cofferdams and water-handling-cofferdams will be installed around the pier and abutments to allow for 
removal and construction of  the substructure elements in the dry. Tree removal will be required for construction 
and the temporary utility relocation; however, disturbed areas will be restored after construction completion. 
 
Sediment and Erosion Control: 
All construction activities will be conducted in accordance with the Department’s Standard Specifications for 
Roads, Bridges, and Incidental Construction, Form 819 Section 1.10 and will also follow required Best 
Management Practices ( BMPs) and sediment and erosion control measures in accordance with the DEEP 
Connecticut Guidelines for Erosion and Sedimentation Control and the DEEP Connecticut Storm Water Quality 
Manual. 
 
Additional Information: 
Bridge No. 04525 is located within aa agricultural and residential area. The proposed maintenance and protection 
of traffic will involve a full closure of Simsbury Road at the bridge and a detour of traffic for approximately 8 
months. The proposed detour route is approximately 7 miles long and will utilize Day Street, Route 20 (West 
Granby Road), and Barndoor Hill Road. Construction is anticipated to begin in the Spring of 2027. 
 
 
Other Alternatives Considered, But Not Recommended: 
 
1. Leave bridge as is: 

Page 15

Federal Local Bridge Program: Bridge No. 04525  
Town of Granby IWWC Permit 
February 2026 
3 
 
- Existing superstructure is nearing end of its service life (70 years) 
- The structure is in fair condition however continued deterioration will result in a poor rating. 
- Continued deterioration could result in downgrading of condition rating and closure of the bridge. 
- Continued deterioration could result in load rating capacity not meeting current standards resulting 
in posted weight restrictions. 
- Substandard bridge and approach rail system not meeting current safety standards. 
- The deck geometry rating of 3 indicates that the structure is not wide enough to accommodate the 
recorded ADT. 
 
2. Rehabilitation of the Superstructure: 
- The existing abutments are in fair condition, however the existing wingwalls have inadequate 
structural capacity to support the superstructure replacement. Rehabilitation was not feasible 
without excavating, removing, and replacing the entire backfill, with a lightweight fill, behind the 
abutments and up to the bottom of footing. 
- Maintaining the existing substructure has minimal temporary and no permanent wetland and 
watercourse impacts. 
- Lower costs than a full replacement, however, the rehabilitation has a higher life cycle cost and a 
shorter expected lifespan than a full replacement, requiring a full replacement in the future. 

Page 16

Federal Local Bridge Program: Bridge No. 04525  
Town of Granby IWWC Permit 
February 2026 
1 
 
Photographs  

Page 17

Federal Local Bridge Program: Bridge No. 04525  
Town of Granby IWWC Permit 
February 2026 
2 
 
 
 
 
Simsbury Road over West Branch of Salmon River – Structure No. 04525 
 
N 

Page 18

Federal Local Bridge Program: Bridge No. 04525  
Town of Granby IWWC Permit 
February 2026 
3 
 
 
Bridge No. 04525 looking North 
 
 
Bridge No. 04525 looking South 

Page 19

Federal Local Bridge Program: Bridge No. 04525  
Town of Granby IWWC Permit 
February 2026 
4 
 
 
 
Upstream Channel 
 
 
Downstream Channel 
 

Page 20

Federal Local Bridge Program: Bridge No. 04525  
Town of Granby IWWC Permit 
February 2026 
5 
 
 
East Elevation (Outlet) 
 
 
West Elevation (Inlet) 
 

Page 21

Federal Local Bridge Program: Bridge No. 04525  
Town of Granby IWWC Permit 
February 2026 
6 
 
 
Pier (North Face) 
 
 
Northerly Span (Note: No Flow) 
 

Page 22

Federal Local Bridge Program: Bridge No. 04525  
Town of Granby IWWC Permit 
February 2026 
7 
 
 
Typical bearing at Abutment No. 1 
 
 
Bearing No. 2 at pier with rust and laminar rust 
 

Page 23

Federal Local Bridge Program: Bridge No. 04525  
Town of Granby IWWC Permit 
February 2026 
8 
 
 
Spall in Pedestal No. 1 at Abutment No. 1 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Exposed prestressing strands with rust noted at ends of beams (typical at pier) 

Page 24

Federal Local Bridge Program: Bridge No. 04525  
Town of Granby IWWC Permit 
February 2026 
List Of Abutters 
 
 
• Granby Land Trust (155 Simsbury Road) 
P.O. Box 23 
Granby, CT 06035 
 
• Granby Land Trust (40 Holcomb Ridge Road) 
P.O. Box 23 
Granby, CT 06035 
 
• Salmon Brook Historical Society, Inc. (143 Simsbury Road) 
P.O. Box 840 
Granby, CT 06035 
 
• Katherine C. Dunnington 
142 Simsbury Road 
West Granby, CT 06090 
 
 
 
 

Page 25

Federal Local Bridge Program: Bridge No. 04525  
Town of Granby IWWC Permit 
February 2026 
 
Property Owner Correspondence 
  

Page 26

Federal Local Bridge Program: Bridge No. 04525  
Town of Granby IWWC Permit 
February 2026 
 
 
Submitted Under Separate Cover 

Page 27

Federal Local Bridge Program: Bridge No. 04525  
Town of Granby IWWC Permit 
February 2026 
 
Site Maps 
  

Page 28

0 2,000 4,000 6,0001,000
Feet
1 INCH = 2,000 FEET
Ü
 
 
▄▄OP
F
300
6 
500
500
750
350
400
650
350750
700
450
450
350
750
650
400
650
300
500
600
350
500
250
650 550 300
300
400
450
500
350
600
450
450
750
400
250
450
250
600
500
550
250
300
30
400
550
450
450
500
300
400
350
200
350
550
450
650
500
400
550
3005
350
450
200
850
500
550
300
550
250
450
700
¬«20
¬«20
FOX RD
BARNDOOR 
HILLS 
RD
HALE
VIEW 
DR
OLD FIELD RD
REED HILL RD
F 
 M CLARK CIR
SIMSBURY RD
HOLCOMB HILL 
DR
THRONEBROOK RD
GRANBY FARMS RD BUSHY HILL 
RD
STRAWBERRY FIELDS RD
STRONG 
RD
W
EED 
HILL 
RD
 N
MUNNISUNK DR
BROAD HILL 
RD
SIMSBURY 
RD
FIRETOWN RD
SIMSBURY RD
DAY 
ST 
S
 
W GRANBY RD
Kendall Brook
 
W 
Br Salmon Brook
W 
Br Salm
on 
Brook
Bissell Brook
Bissell Brook
W Br Salmon Br 
Kendell Brook
Kettle
Pond
Spring
Pond
West Granby
Huggins Gorge
Broad
Hill
Stony
Hill
Weed
Hill
Barndoor Hills
Metacomet
Ridge
The
Knolls
USGS QUADRANGLE MAP
BRIDGE NO. 04525 IN GRANBY, CT
SIMSBURY ROAD OVER WEST BRANCH SALMON BROOK
USGS QUAD
MAP
#21
BRIDGE NO. 04525

Page 29

Page 30

Federal Local Bridge Program: Bridge No. 04525  
Town of Granby IWWC Permit 
February 2026 
 
Soil Scientist Report 
  

Page 31

 
 
 
 
 
www.ecomapsllc.com | 42 Bar Gate Trail, Killingworth CT 06419 | (248) 885-5477 | michelle@ecomapsllc.com 
 
May 3, 2025 
 
 
CHA Consulting, Inc.  
Attn:  Stephany Dubina (SDubina@chasolutions.com) 
 John Wengell (JWengell@chasolutions.com) 
 
 
RE:  Wetland Delineation Report, CT DOT State Project No. 0055-0145 
Rehabilitation of Bridge No. 04525 carrying Simsbury Road over the South Branch of Salmon Brook 
Granby, CT 
 
 
Ms. Dubina and Mr. Wengell, 
 
At the request of CHA, I conducted an inspection of the area demarcated on the mapping provided in the 
Request for Proposals for the above-referenced project. A sketch map of flagged locations is included in 
Attachment A: Wetland Sketch Map. The purpose of the inspection was to delineate federal and State of 
Connecticut jurisdictional wetlands and watercourses and was conducted by myself, a soil scientist as 
defined in the Connecticut General Statutes, Title 22a, Chapter 440, Inland Wetlands  and Watercourses 
Act, Section 22a-38, on April 21, 2025. 
Regulated Wetlands and Watercourses 
In Connecticut wetlands are defined as “land, including submerged land, not regulated pursuant to 
sections 22a-28 to 22a-35, inclusive, which consists of any of the soil types designated as poorly drained, 
very poorly drained, alluvial, and floodplain by the National Cooperative Soils Survey, as may be amended 
from time to time, of the Natural Resources Conservation Service of the United States Department of 
Agriculture.”  
Watercourses are defined as being “rivers, streams, brooks, waterways, lakes, ponds, marshes, swamps, 
bogs and all other bodies of water, natural or artificial, vernal or intermittent, public or private, which are 
contained within, flow through or border upon this state or any portion thereof, not regulated pursuant 
to sections 22a -28 to 22a -35, inclusive. Intermittent watercourses shall be delineated by a defined 
permanent channel and bank and the occurrence of two or more of the following characteristics: (A) 
Evidence of scour or deposits of recent alluvium or detritus, (B) the presence of standing or flowing water 
for a duration longer than a particular storm incident, and (C) the presence of hydrophytic vegetation.” 
Federal Wetlands are defined as “Those areas that are inundated or saturated by surface or ground water 
at a frequency and duration sufficient to support, and that under normal circumstances do support, a 
prevalence of vegetation typically adapted for life in saturated soil conditions.” Federal wetlands are 
delineated based on three-parameters looking at soils, vegetation and hydrology. 

Page 32

Wetland Delineation Report 
CT DOT 0055-0145 
2 
State and federal wetland resource areas were delineated by examining the upper 24 ” of the soil profile 
and those areas that met the criteria noted above were demarcated in the field with sequentially 
numbered pink and black flagging. The limit of the Ordinary High Water (OHW) both up and downstream 
of the Bridge was staked in the field with blue flagging atop wooden stakes with the elevation of the OHW 
demarcated in black writing. The location of the OHW stakes is presented in both Attachment A: Wetland 
Sketch Maps and Attachment F: OHW Data Form. 
Site Description and Wetlands 
The delineation focused on  areas along Simsbury Road north and south of Bridge 04525 (herein the 
Bridge) that spans the South Branch of  Salmon Brook (herein the Brook ) in the Town of Granby, 
Connecticut. The Brook flows from north to southeast beneath the Bridge and the delineation area is 
abutted by agricultural fields to the southwest and northeast and forested areas to the northwest and 
southeast. The Granby Land Trust Wilcox Family Preserve maintains an active hiking trail along the Brook 
to the west of the Bridge. Wetland resources were flagged as follows: 
Wetland W1 (Flags W1-1 through W1-5) 
This palustrine emergent wetland is located within a man-made topographical depression southeast 
of the intersection of Holcomb Hill Road and Simsbury Road north of the Bridge. A stone-l ined berm 
is located at the southern margin that functions as an overflow/outlet into the 
intermittent watercourse to the east. The wetland is fringed by managed grassland and 
landscaping to the north, a narrow band of woodland to the south, Simsbury Road to the west and 
the intermittent watercourse to the east. The wetland appears to be hydrologically supported by a 
restrictive layer beneath the evaluated soils and by surficial runoff from the adjacent 
roadways. Vegetation within the wetland was sparse but consisted predominantly of invasive 
phragmites. The fact that the basin is isolated from other wetlands and exists as a man-m ade 
feature likely make it regulated only at the State-level. 
Co
nnecticut Floodplain Wetlands CT1 , CT2, CT3  (Flags CT1-1 through CT1 -10, CT 2-1 through CT2 -4 and 
CT3-1 through CT3-3) 
Wetlands CT1, CT2, and CT3 are situated along the banks of the Brook, with CT 2 and CT3 located 
along the western bank and CT 1 located along the eastern bank  of the Bridge. These wetlands 
delineate the extent of active floodplain soils adjacent to the Brook, regulated solely under State 
jurisdiction. The delineated areas lack the three requisite characteristics —hydric soils, hydrophytic 
vegetation, and wetland  hydrology—necessary for classification as federally regulated wetlands. 
However, the soils are classified as poorly drained, very poorly drained, alluvial, and/or floodplain 
by the National Cooperative Soil Survey (NRCS). 
Hydrological indicators within the Brook and floodplain include observable signs of fluctuating 
water levels, such as erosion/scour, litter removal, exposed roots, undercut banks, and alluvial 
deposits located upgradient of the ordinary high-water (OHW) mark. Topographically, the wetlands 
are generally aligned with a distinct “step” separating the Brook from adjacent upland areas. 
Wetland CT1 is contiguous beneath the Bridge and extends between the central and eastern Bridge 
abutments as characterized by a sandy outwash area  (See Attachment D: Photos 3 and 4). Due to 
its location under the Bridge, vegetation in this area is sparse. Immediately north of the Bridge, 
within the floodplain, is a large stand of Japanese knotweed and an ex panse of exposed stone and 
cobble. 

Page 33

Wetland Delineation Report 
CT DOT 0055-0145 
3 
 
West Branch of Salmon Brook 
The Brook flows  from north to southeast beneath the Bridge and has a substrate co mprised 
predominantly of cobbles and sand. The Brook is characterized by shallow depths (less than 3 feet) 
and exhibits a flow regime consisting of riffles and runs, with infrequent pools. The channel width 
varies between approximately 30 and 50 feet. Near the Bridge, the banks are heavil y reinforced 
with boulder armoring, while upstream and downstream  banks are dominated by herbaceous and 
woody vegetation. 
About 150–200 feet upstream of the Bridge, a steep slope next to the Brook is experiencing heavy 
erosion. The erosion starts at the slope’s top, away from the Brook’s flow, undercutting roots of 
mature trees near Simsbury Road (see Attachment D: Photos 6 and 7). The Connecticut Department 
of Energy and Environmental Protection (CT DEEP) classifies the Brook’s stream flow as Class 3, 
indicating that it has a moderately altered stream flow. 
Within the delineation area, observed invasive vegetation include s multiflora rose ( Rosa multiflora ), 
Japanese barberry ( Berberis thunbergii ), mugwort (Artemisia vulgaris ), Asiatic bittersweet ( Celastrus 
orbiculatus), Morrow’s honeysuckle ( Lonicera morrowii), Japanese knotweed ( Polygonum cuspidatum), 
narrowleaf bittercress (Cardamine impatiens) and burning bush (Euonymus alata).  
Wetland Soil Types 
To aid in the evaluation of wetland soils which may occur in the project area, digitally available soil survey 
information was obtained from the Natural Resources Conservation Service (Attachment B: Soils Map).  
Although the NRCS soil data is not representative of exact, on -site conditions, it provides a general 
representation of soil characteristics and the soil catena present in the region.  
The NRCS Soil Survey Geographic Database (SSURGO) maps the soils within the project area as  Sudbury 
sandy loam, Hinckley loamy sand, Suncook loamy fine sand, and Occum fine sandy loam, all of which are 
described below: 
• Sudbury sandy loam:  This series consists of very deep, moderately well and somewhat poorly 
drained soils  located on outwash plains.  They are nearly level to strongly sloping soils in 
slight depressions and on terraces and foot slopes in areas of outwash or glaciofluvial 
deposits with slopes ranging from 0 to 15 percent.  
• Hinckley loamy sand:  This series consists of very deep, excessively drained soils formed in 
glaciofluvial materials. They are nearly level through very steep soils on outwash terraces, 
outwash plains, outwash deltas, kames, kame terraces, and eskers with slopes ranging from 0 
to 60 percent. 
• Suncook loamy, fine sand:  This series consists of very deep, excessively drained sandy soils 
formed in alluvial sediments that are nearly level soils on floodplains, subject to frequent 
or occasional flooding with slopes ranging from 0 to 3 percent.  
• Occum fine, sandy loam:  This series consists of very deep, well drained loamy soils formed 
in alluvial sediments. They are nearly level soils on floodplains, subject to common 
flooding. Slope ranges from 0 to 3 percent. 
Mapping of inland wetland soils by the Soil Survey Geographic Database made available through CT 
Department of Energy and Environmental Protection (CT DEEP) was generally consistent in that it depicts 
wetland soils along the Brook margins. 

Page 34

Wetland Delineation Report 
CT DOT 0055-0145 
4 
If you have any questions regarding the concerns, please don’t hesitate to contact me by email at 
michelle@ecomapsllc.com or by phone at 248-885-5477.  
Re
gards, 
Michelle Ford, PWS, CWB®, CESSWI 
Registered Professional Soil 
Scientist EcoMaps, LLC. 
Attachments: 
Attachment A:  Wetland Sketch Map 
Attachment B:  Soils Map 
Attachment C:  Site Photographs 
Attachment D:  Wetland Functions and Values Evaluation Form 
Attachment E:  OHW Data Form 

Page 35

 
 
 
 
Attachment A 
Wetland Sketch Map 
  

Page 36

#
##
# #
#
# #
# #
#
#
#
#
# #
#
##
#
#
#
#!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(
!(!(
")
")
")
")
")
")
")
")
")
")
")
")
")
!(
CT1-1
CT1-2
CT1-3
CT1-4
CT1-5
CT1-6
CT1-7
CT1-8
CT1-9
CT1-10
CT2-1
CT2-2
CT2-3
CT2-4
CT3-1
CT3-2
CT3-3
IWC1-1
IWC1-2
IWC1-3
IWC1-4
IWC1-5
IWC1-6
IWC1-7
W1-1
W1-2 W1-3
W1-4
W1-5
OHW-1
OHW-2
OHW-3
OHW-4
OHW-5
OHW-6
OHW-1A
OHW-2A
OHW-3A
OHW-4A
OHW-5A
OHW-6A
OHW-7A
www.ecomapsllc.com
/
1. Locations as shown are estimated
and for field location of flags only
.
2. Wetlands delineated by M. Ford
on April 21, 2025.
3. Centerline of narrow intermittent
watercourse (IWC 1) series flagged.
NotesWetland Sketch Map Legend
1 in. = 140 ft.
CT DOT 0055-0145
Simsbury Road
Gr
anby, CT
!( Wetland Flag
!( OHW Flag (no elevation)
") OHW Stake
# Federal Wetland Boundary
# CT-Only Wetland Boundary
Active Channel (OHW)
Intermittent Watercourse
CT Wetland
Delineation Limits (approx.)
Floodplain wetland
continues beneath
Bridge.
OHW indicators diffuse
on rocky
, floodplain island
between OHW-6A and 7A.
Very steep, eroding
slope.
Simsbury Rd.
Holcomb Hill Rd.
Centerline of narrow
(2-3 ft wide) intermit
tent
watercourse (IWC1).

Page 37

 
 
 
Attachment B 
Soils Map 
  

Page 38

Soil Map—State of Connecticut, Western Part
(Att. B: Soils Map)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
4/20/2025
Page 1 of 3
4645410 4645450 4645490 4645530 4645570 4645610 4645650 4645690 4645730
4645410 4645450 4645490 4645530 4645570 4645610 4645650 4645690 4645730
679400 679440 679480 679520 679560 679600 679640
679440 679480 679520 679560 679600 679640
41°  56' 35'' N
72°  50' 9'' W
41°  56' 35'' N
72°  49' 57'' W
41°  56' 24'' N
72°  50' 9'' W
41°  56' 24'' N
72°  49' 57'' WN
Map projection: Web Mercator   Corner coordinates: WGS84   Edge tics: UTM Zone 18N WGS84
0 50 100 200 300
Feet
0 20 40 80 120
Meters
Map Scale: 1:1,650 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.

Page 39

MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at 
1:12,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause 
misunderstanding of the detail of mapping and accuracy of soil 
line placement. The maps do not show the small areas of 
contrasting soils that could have been shown at a more detailed 
scale.
Please rely on the bar scale on each map sheet for map 
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL: 
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator 
projection, which preserves direction and shape but distorts 
distance and area. A projection that preserves area, such as the 
Albers equal-area conic projection, should be used if more 
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as 
of the version date(s) listed below
.
Soil Survey Area: State of Connecticut, Western Part
Survey Area Data: Version 2, Aug 30, 2024
Soil map units are labeled (as space allows) for map scales 
1:50,000 or larger
.
Date(s) aerial images were photographed: Jun 14, 2022—Oct 6, 
2022
The orthophoto or other base map on which the soil lines were 
compiled and digitized probably dif
fers from the background 
imagery displayed on these maps. As a result, some minor 
shifting of map unit boundaries may be evident.
Soil Map—State of Connecticut, Western Part
(Att. B: Soils Map)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
4/20/2025
Page 2 of 3

Page 40

Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
23A Sudbury sandy loam, 0 to 5 
percent slopes
0.0 0.2%
38C Hinckley loamy sand, 3 to 15 
percent slopes
1.4 46.2%
38E Hinckley loamy sand, 15 to 45 
percent slopes
0.0 1.3%
100 Suncook loamy fine sand 0.3 8.3%
101 Occum fine sandy loam 1.4 44.0%
Totals for Area of Interest 3.1 100.0%
Soil Map—State of Connecticut, Western Part Att. B: Soils Map
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
4/20/2025
Page 3 of 3

Page 41

 
 
 
Attachment C:  
ACOE Wetland 
Determination Data Forms 
  

Page 42

Project/Site:
Applicant/Owner: State:
Investigator(s):
Lat:
Soil Map Unit Name: NWI classification:
X
Are Vegetation , Soil , or Hydrology Yes X
Are Vegetation , Soil , or Hydrology
SUMMARY OF FINDINGS – Attach site map showing sampling point locations, transects, important features, etc.
X No
No X X
No X
X
X
X Yes X
U.S.  Army Corps of Engineers
WETLAND DETERMINATION DATA SHEET – Northcentral and Northeast Region
See ERDC/EL TR-12-1; the proponent agency is CECW-CO-R
OMB Control #: 0710-0024, Exp: 11/30/2024
Requirement Control Symbol EXEMPT:
(Authority: AR 335-15, paragraph 5-2a)
No evidence of hydrology observed.
CT DOT 0055-0145 City/County: Granby/Hartford Sampling Date: 4/21/2025
Landform (hillside, terrace, etc.): Embankment Local relief (concave, convex, none): Convex Slope %: 5
CT DOT/CHA CT Sampling Point: OHW-5up
M.Ford Section, Township, Range:
NAD83
Occum fine sandy loam
Are climatic / hydrologic conditions on the site typical for this time of year? Yes No (If no, explain in Remarks.) 
Subregion (LRR or MLRA): LRR R, MLRA 145 41.9412 Long: -72.8345 Datum:
significantly disturbed? Are “Normal Circumstances” present? No
naturally problematic? (If needed, explain any answers in Remarks.)
Hydrophytic Vegetation Present? Yes
Wetland Hydrology Present? Yes If yes, optional Wetland Site ID:
Is the Sampled Area
Hydric Soil Present? Yes within a Wetland? Yes No
Remarks:  (Explain alternative procedures here or in a separate report.)
Plot
 is located upgradient of the southern embankment to the West Branch of the Salmon Brook east of Bridge 04525. The embankment was created 
using stone fill
 likely for bank stablization as evidenced by the large boulders along the riverbank. 
HYDROLOGY
Wetland Hydrology Indicators: Secondary Indicators (minimum of two required)
Primary Indicators (minimum of one is required; check all that apply)  Surface Soil Cracks (B6)
Surface Water (A1)
Water Marks (B1) Hydrogen Sulfide Odor (C1) Crayfish Burrows (C8)
Sediment Deposits (B2) Oxidized Rhizospheres on Living Roots (C3) Saturation Visible on Aerial Imagery (C9)
Water-Stained Leaves (B9) Drainage Patterns (B10)
High Water Table (A2) Aquatic Fauna (B13) Moss Trim Lines (B16)
Saturation (A3) Marl Deposits (B15) Dry-Season Water Table (C2)
Iron Deposits (B5) Thin Muck Surface (C7) Shallow Aquitard (D3)
Inundation Visible on Aerial Imagery (B7) Other (Explain in Remarks) Microtopographic Relief (D4)
Drift Deposits (B3) Presence of Reduced Iron (C4) Stunted or Stressed Plants (D1)
Algal Mat or Crust (B4) Recent Iron Reduction in Tilled Soils (C6) Geomorphic Position (D2)
Water Table Present? Yes No Depth (inches):
Sparsely Vegetated Concave Surface (B8) FAC-Neutral Test (D5)
Field Observations:
Surface Water Present? Yes No Depth (inches):
Remarks: 
No
(includes capillary fringe)
Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available:
Saturation Present? Yes No Depth (inches): Wetland Hydrology Present?
ENG FORM 6116-8, JUL 2018 Northcentral and Northeast – Version 2.0

Page 43

Sampling Point:
(Plot size:
1.
2.
3.
4.
5.
6. (A/B)
7.
Sapling/Shrub Stratum (Plot size: x 1 =
1. x 2 =
2. x 3 =
3. x 4 =
4. x 5 =
5. Column Totals: (B)
6.
7.
Herb Stratum (Plot size: X
1.
2. 4 - Morphological Adaptations1 (Provide supporting
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
(Plot size:
1.
2.
3.
4. X
VEGETATION – Use scientific names of plants. OHW-5up
Tree Stratum 30 )
Absolute 
% Cover
Dominant 
Species?
Indicator 
Status Dominance Test worksheet:
Acer saccharinum 50 Yes FACW Number of Dominant Species 
That Are OBL, FACW, or FAC:Platanus occidentalis 10 No FACW 4 (A)
Betula nigra 20 Yes FACW Total Number of Dominant 
Species Across All Strata: 7 (B)
Percent of Dominant Species 
That Are OBL, FACW, or FAC: 57.1%
Lindera benzoin 15 Yes FACW
Prevalence Index worksheet:
10 Yes UPL FAC species 3 9
0 0
Total % Cover of:
190
Euonymus alatus
Rosa multiflora 5 No FACU UPL species 10 50
Berberis thunbergii 10 Yes FACU FACU species 25
80 =Total Cover
349
Prevalence Index  = B/A = 2.62
Pinus strobus 5 No FACU 133 (A)
15 ) OBL species
Multiply by:
FACW species 95
100
45 =Total Cover 1 - Rapid Test for Hydrophytic Vegetation
5 ) 2 - Dominance Test is >50%
Hydrophytic Vegetation Indicators:
Alliaria petiolata 5 Yes FACU 3 - Prevalence Index is ≤3.01
Solidago rugosa 3 Yes FAC
Problematic Hydrophytic Vegetation1 (Explain)
1Indicators of hydric soil and wetland hydrology must 
be present, unless disturbed or problematic.
data in Remarks or on a separate sheet)
Sapling/shrub – Woody plants less than 3 in. DBH 
and greater than or equal to 3.28 ft (1 m) tall.
Definitions of Vegetation Strata:
Tree – Woody plants 3 in. (7.6 cm) or more in 
diameter at breast height (DBH), regardless of height.
Woody Vine Stratum 30 ) Woody vines – All woody vines greater than 3.28 ft in 
height.
Herb – All herbaceous (non-woody) plants, regardless 
of size, and woody plants less than 3.28 ft tall.8 =Total Cover
Hydrophytic 
Vegetation 
Present? Yes No
Remarks:  (Include photo numbers here or on a separate sheet.)
Tree species with deep roots into water table near river elevation contribute to dominant hydric vegetation but shallower rooted shrubs and 
herbaceous layer does not lean hydric. 
=Total Cover
ENG FORM 6116-8, JUL 2018 Northcentral and Northeast – Version 2.0

Page 44

Sampling Point
X
SOIL OHW-5up
Profile Description:  (Describe to the depth needed to document the indicator or confirm the absence of indicators.)
Depth Matrix Redox Features
Sandy loam
(inches) Color (moist) % Color (moist) % Type1
2-14 10YR 4/6
Loamy/Clayey Sandy loam
Loc2 Texture Remarks
Loamy/Clayey100
Hydric Soil Indicators: Indicators for Problematic Hydric Soils3:
Histosol (A1)
Polyvalue Below Surface (S8) (LRR R,
2 cm Muck (A10) (LRR K, L, MLRA 149B)
Coast Prairie Redox (A16) (LRR K, L, R)
5 cm Mucky Peat or Peat (S3) (LRR K, L, R)
Hydrogen Sulfide (A4) Thin Dark Surface (S9) (LRR R, MLRA 149B)
unless disturbed or problematic.
Polyvalue Below Surface (S8) (LRR K, L)
1Type:  C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. 2Location:  PL=Pore Lining, M=Matrix.
Thick Dark Surface (A12) Loamy Gleyed Matrix (F2) Piedmont Floodplain Soils (F19) (MLRA 149B)
Depleted Matrix (F3) Red Parent Material (F21) (outside MLRA 145)
Stratified Layers (A5) High Chroma Sands (S11) (LRR K, L) Thin Dark Surface (S9) (LRR K, L)
Depleted Below Dark Surface (A11) Loamy Mucky Mineral (F1) (LRR K, L) Iron-Manganese Masses (F12) (LRR K, L, R)
0-2 10YR 3/2 100
Histic Epipedon (A2)
Yes No
Remarks:
Dense fill at 12-14 inches associated with created berm. No evidence of hydric soils within 14" and unlikely to be encountered within 24" given the 
topographic position, lack of hydrology and position atop the berm.
Restrictive Layer (if observed):
Type: Stone/rock fill
Depth (inches):                   14 Hydric Soil Present?
Black Histic (A3)
Mesic Spodic (A17)
 (MLRA 144A, 145, 149B)
Stripped Matrix (S6)
Dark Surface (S7)
MLRA 149B)
Redox Depressions (F8)
Marl (F10) (LRR K, L)
Red Parent Material (F21) (MLRA 145)
3Indicators of hydrophytic vegetation and
wetland hydrology must be present, 
Sandy Gleyed Matrix (S4)
Other (Explain in Remarks)
Redox Dark Surface (F6)
Sandy Mucky Mineral (S1) Depleted Dark Surface (F7)
Very Shallow Dark Surface (F22)
Sandy Redox (S5)
ENG FORM 6116-8, JUL 2018 Northcentral and Northeast – Version 2.0

Page 45

Project/Site:
Applicant/Owner: State:
Investigator(s):
Lat:
Soil Map Unit Name: NWI classification:
X
Are Vegetation , Soil , or Hydrology Yes X
Are Vegetation , Soil , or Hydrology
SUMMARY OF FINDINGS – Attach site map showing sampling point locations, transects, important features, etc.
No X
No X X
No X
X
X
X Yes X
Remarks: 
No
(includes capillary fringe)
Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available:
Saturation Present? Yes No Depth (inches): Wetland Hydrology Present?
Water Table Present? Yes No Depth (inches):
Sparsely Vegetated Concave Surface (B8) FAC-Neutral Test (D5)
Field Observations:
Surface Water Present? Yes No Depth (inches):
Iron Deposits (B5) Thin Muck Surface (C7) Shallow Aquitard (D3)
Inundation Visible on Aerial Imagery (B7) Other (Explain in Remarks) Microtopographic Relief (D4)
Drift Deposits (B3) Presence of Reduced Iron (C4) Stunted or Stressed Plants (D1)
Algal Mat or Crust (B4) Recent Iron Reduction in Tilled Soils (C6) Geomorphic Position (D2)
Remarks:  (Explain alternative procedures here or in a separate report.)
Plot is located upgradient of a small, manmade basin just southeast of the intersection of Holcomb Hill Rd. and Simsbury Rd. north of Bridge 04525. 
HYDROLOGY
Wetland Hydrology Indicators: Secondary Indicators (minimum of two required)
Primary Indicators (minimum of one is required; check all that apply)                                       Surface Soil Cracks (B6)
Surface Water (A1)
Water Marks (B1) Hydrogen Sulfide Odor (C1) Crayfish Burrows (C8)
Sediment Deposits (B2) Oxidized Rhizospheres on Living Roots (C3) Saturation Visible on Aerial Imagery (C9)
Water-Stained Leaves (B9) Drainage Patterns (B10)
High Water Table (A2) Aquatic Fauna (B13) Moss Trim Lines (B16)
Saturation (A3) Marl Deposits (B15) Dry-Season Water Table (C2)
Is the Sampled Area
Hydric Soil Present? Yes within a Wetland? Yes No
significantly disturbed? Are “Normal Circumstances” present? No
naturally problematic? (If needed, explain any answers in Remarks.)
Hydrophytic Vegetation Present? Yes
Wetland Hydrology Present? Yes If yes, optional Wetland Site ID:
Are climatic / hydrologic conditions on the site typical for this time of year? Yes No (If no, explain in Remarks.) 
Subregion (LRR or MLRA): LRR R, MLRA 145 41.9412 Long: -72.8345 Datum:
U.S.  Army Corps of Engineers
WETLAND DETERMINATION DATA SHEET – Northcentral and Northeast Region
See ERDC/EL TR-12-1; the proponent agency is CECW-CO-R
OMB Control #: 0710-0024, Exp: 11/30/2024
Requirement Control Symbol EXEMPT:
(Authority: AR 335-15, paragraph 5-2a)
No evidence of hydrology observed.
CT DOT 0055-0145 City/County: Granby/Hartford Sampling Date: 4/21/2025
Landform (hillside, terrace, etc.): Terrace/Field Local relief (concave, convex, none): Convex Slope %: 5
CT DOT/CHA CT Sampling Point: W1-1up
M.Ford Section, Township, Range:
NAD83
Occum fine sandy loam
ENG FORM 6116-8, JUL 2018 Northcentral and Northeast – Version 2.0

Page 46

Sampling Point:
(Plot size:
1.
2.
3.
4.
5.
6. (A/B)
7.
Sapling/Shrub Stratum (Plot size: x 1 =
1. x 2 =
2. x 3 =
3. x 4 =
4. x 5 =
5. Column Totals: (B)
6.
7.
Herb Stratum (Plot size:
1.
2. 4 - Morphological Adaptations1 (Provide supporting
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
(Plot size:
1.
2.
3.
4. X
Remarks:  (Include photo numbers here or on a separate sheet.)
=Total Cover
Hydrophytic 
Vegetation 
Present? Yes No
Herb – All herbaceous (non-woody) plants, regardless 
of size, and woody plants less than 3.28 ft tall.85 =Total Cover
Sapling/shrub – Woody plants less than 3 in. DBH 
and greater than or equal to 3.28 ft (1 m) tall.
Definitions of Vegetation Strata:
Tree – Woody plants 3 in. (7.6 cm) or more in 
diameter at breast height (DBH), regardless of height.
Woody Vine Stratum 30 ) Woody vines – All woody vines greater than 3.28 ft in 
height.
Potentilla simplex 5 No FACU
FACU
Problematic Hydrophytic Vegetation1 (Explain)
Alliaria petiolata 10 No FACU 1Indicators of hydric soil and wetland hydrology must 
be present, unless disturbed or problematic.
Eurybia divaricata 30 Yes UPL data in Remarks or on a separate sheet)
35 =Total Cover 1 - Rapid Test for Hydrophytic Vegetation
5 ) 2 - Dominance Test is >50%
Hydrophytic Vegetation Indicators:
Lolium perenne 20 Yes FACU 3 - Prevalence Index is ≤3.01
Festuca arundinacea 20 Yes
90 =Total Cover
855
Prevalence Index  = B/A = 4.07
210 (A)
15 ) OBL species
Multiply by:
FACW species 0
620
Juniperus horizontalis
UPL species 35 175
Buxus sempervirens 5 No UPL FACU species 155
FACU
Prevalence Index worksheet:
10 Yes FACU FAC species 20 60
0 0
Total % Cover of:
0
8 (B)
Percent of Dominant Species 
That Are OBL, FACW, or FAC: 12.5%
Rosa multiflora 20 Yes
30 Yes FACU 1 (A)
Betula alleghaniensis 20 Yes FAC Total Number of Dominant 
Species Across All Strata:
VEGETATION – Use scientific names of plants. W1-1up
Tree Stratum 30 )
Absolute 
% Cover
Dominant 
Species?
Indicator 
Status Dominance Test worksheet:
Carya ovata 40 Yes FACU Number of Dominant Species 
That Are OBL, FACW, or FAC:Pinus strobus
ENG FORM 6116-8, JUL 2018 Northcentral and Northeast – Version 2.0

Page 47

Sampling Point
X
Black Histic (A3)
Mesic Spodic (A17)
 (MLRA 144A, 145, 149B)
Stripped Matrix (S6)
Dark Surface (S7)
MLRA 149B)
Redox Depressions (F8)
Marl (F10) (LRR K, L)
Red Parent Material (F21) (MLRA 145)
3Indicators of hydrophytic vegetation and
wetland hydrology must be present, 
Sandy Gleyed Matrix (S4)
Other (Explain in Remarks)
Redox Dark Surface (F6)
Sandy Mucky Mineral (S1) Depleted Dark Surface (F7)
Very Shallow Dark Surface (F22)
Sandy Redox (S5)
Yes No
Remarks:
Fill encountered at 14 inches likely assiciated with the roadside embankment.
Restrictive Layer (if observed):
Type: Stone/rock fill
Depth (inches):                   14 Hydric Soil Present?
Polyvalue Below Surface (S8) (LRR K, L)
1Type:  C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. 2Location:  PL=Pore Lining, M=Matrix.
Thick Dark Surface (A12) Loamy Gleyed Matrix (F2) Piedmont Floodplain Soils (F19) (MLRA 149B)
Depleted Matrix (F3) Red Parent Material (F21) (outside MLRA 145)
Stratified Layers (A5) High Chroma Sands (S11) (LRR K, L) Thin Dark Surface (S9) (LRR K, L)
Depleted Below Dark Surface (A11) Loamy Mucky Mineral (F1) (LRR K, L) Iron-Manganese Masses (F12) (LRR K, L, R)
0-1 10YR 4/2 100
Histic Epipedon (A2)
Hydric Soil Indicators: Indicators for Problematic Hydric Soils3:
Histosol (A1)
Polyvalue Below Surface (S8) (LRR R,
2 cm Muck (A10) (LRR K, L, MLRA 149B)
Coast Prairie Redox (A16) (LRR K, L, R)
5 cm Mucky Peat or Peat (S3) (LRR K, L, R)
Hydrogen Sulfide (A4) Thin Dark Surface (S9) (LRR R, MLRA 149B)
unless disturbed or problematic.
5-14 10YR 4/6 100
100
Sandy Loamy sand
Loc2 Texture Remarks
Loamy/Clayey
Loamy/Clayey Sandy loam
SOIL W1-1up
Profile Description:  (Describe to the depth needed to document the indicator or confirm the absence of indicators.)
Depth Matrix Redox Features
Sandy loam
(inches) Color (moist) % Color (moist) % Type1
1-5 10YR 4/4
ENG FORM 6116-8, JUL 2018 Northcentral and Northeast – Version 2.0

Page 48

Project/Site:
Applicant/Owner: State:
Investigator(s):
Lat:
Soil Map Unit Name: NWI classification:
X
Are Vegetation , Soil , or Hydrology Yes X
Are Vegetation , Soil , or Hydrology
SUMMARY OF FINDINGS – Attach site map showing sampling point locations, transects, important features, etc.
X No
X No X
X No
X X
X
X
X
X
X
X
X Yes X
U.S.  Army Corps of Engineers
WETLAND DETERMINATION DATA SHEET – Northcentral and Northeast Region
See ERDC/EL TR-12-1; the proponent agency is CECW-CO-R
OMB Control #: 0710-0024, Exp: 11/30/2024
Requirement Control Symbol EXEMPT:
(Authority: AR 335-15, paragraph 5-2a)
Wetland is a small, man-made depression designed to accommodate drainage from the adjacent roadways.
CT DOT 0055-0145 City/County: Granby/Hartford Sampling Date: 4/21/2025
Landform (hillside, terrace, etc.): Roadside embankment Local relief (concave, convex, none): Convex Slope %: 3
CT DOT/CHA CT Sampling Point: W1-1wet
M.Ford Section, Township, Range:
NAD83
Occum fine sandy loam PEM
Are climatic / hydrologic conditions on the site typical for this time of year? Yes No (If no, explain in Remarks.) 
Subregion (LRR or MLRA): LRR R, MLRA 145 41.9418 Long: -72.8342 Datum:
significantly disturbed? Are “Normal Circumstances” present? No
naturally problematic? (If needed, explain any answers in Remarks.)
Hydrophytic Vegetation Present? Yes
Wetland Hydrology Present? Yes If yes, optional Wetland Site ID:
Is the Sampled Area
Hydric Soil Present? Yes within a Wetland? Yes No
Remarks:  (Explain alternative procedures here or in a separate report.)
Plot is located pgradient of a small, manmade basin just southeast of the intersection of Holcomb Hill Rd. and Simsbury Rd. north of Bridge 04525. 
HYDROLOGY
Wetland Hydrology Indicators: Secondary Indicators (minimum of two required)
Primary Indicators (minimum of one is required; check all that apply)                                       Surface Soil Cracks (B6)
Surface Water (A1)
Water Marks (B1) Hydrogen Sulfide Odor (C1) Crayfish Burrows (C8)
Sediment Deposits (B2) Oxidized Rhizospheres on Living Roots (C3) Saturation Visible on Aerial Imagery (C9)
Water-Stained Leaves (B9) Drainage Patterns (B10)
High Water Table (A2) Aquatic Fauna (B13) Moss Trim Lines (B16)
Saturation (A3) Marl Deposits (B15) Dry-Season Water Table (C2)
Iron Deposits (B5) Thin Muck Surface (C7) Shallow Aquitard (D3)
Inundation Visible on Aerial Imagery (B7) Other (Explain in Remarks) Microtopographic Relief (D4)
Drift Deposits (B3) Presence of Reduced Iron (C4) Stunted or Stressed Plants (D1)
Algal Mat or Crust (B4) Recent Iron Reduction in Tilled Soils (C6) Geomorphic Position (D2)
1
Water Table Present? Yes No Depth (inches): 1
Sparsely Vegetated Concave Surface (B8) FAC-Neutral Test (D5)
Field Observations:
Surface Water Present? Yes No Depth (inches):
Remarks: 
No
(includes capillary fringe)
Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available:
Saturation Present? Yes No Depth (inches): 0 Wetland Hydrology Present?
ENG FORM 6116-8, JUL 2018 Northcentral and Northeast – Version 2.0

Page 49

Sampling Point:
(Plot size:
1.
2.
3.
4.
5.
6. (A/B)
7.
Sapling/Shrub Stratum (Plot size: x 1 =
1. x 2 =
2. x 3 =
3. x 4 =
4. x 5 =
5. Column Totals: (B)
6.
7.
Herb Stratum (Plot size: X
1. X
2. 4 - Morphological Adaptations1 (Provide supporting
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
(Plot size:
1.
2.
3.
4. X
VEGETATION – Use scientific names of plants. W1-1wet
Tree Stratum 30 )
Absolute 
% Cover
Dominant 
Species?
Indicator 
Status Dominance Test worksheet:
Number of Dominant Species 
That Are OBL, FACW, or FAC: 2 (A)
Total Number of Dominant 
Species Across All Strata: 2 (B)
Percent of Dominant Species 
That Are OBL, FACW, or FAC: 100.0%
Prevalence Index worksheet:
FAC species 0 0
0 0
Total % Cover of:
190
UPL species 0 0
FACU species 0
=Total Cover
190
Prevalence Index  = B/A = 2.00
95 (A)
15 ) OBL species
Multiply by:
FACW species 95
0
=Total Cover 1 - Rapid Test for Hydrophytic Vegetation
5 ) 2 - Dominance Test is >50%
Hydrophytic Vegetation Indicators:
Phragmites australis 70 Yes FACW 3 - Prevalence Index is ≤3.01
Phalaris arundinacea 20 Yes FACW
Problematic Hydrophytic Vegetation1 (Explain)
1Indicators of hydric soil and wetland hydrology must 
be present, unless disturbed or problematic.
Osmundastrum cinnamomeum 5 No FACW data in Remarks or on a separate sheet)
Sapling/shrub – Woody plants less than 3 in. DBH 
and greater than or equal to 3.28 ft (1 m) tall.
Definitions of Vegetation Strata:
Tree – Woody plants 3 in. (7.6 cm) or more in 
diameter at breast height (DBH), regardless of height.
Woody Vine Stratum 30 ) Woody vines – All woody vines greater than 3.28 ft in 
height.
Herb – All herbaceous (non-woody) plants, regardless 
of size, and woody plants less than 3.28 ft tall.95 =Total Cover
Hydrophytic 
Vegetation 
Present? Yes No
Remarks:  (Include photo numbers here or on a separate sheet.)
=Total Cover
ENG FORM 6116-8, JUL 2018 Northcentral and Northeast – Version 2.0

Page 50

Sampling Point
X
X
X
SOIL W1-1wet
Profile Description:  (Describe to the depth needed to document the indicator or confirm the absence of indicators.)
Depth Matrix Redox Features
M
(inches) Color (moist) % Color (moist) % Type1
6-14 10YR 4/2
Loamy/Clayey
Loc2 Texture Remarks
M Sandy
Sandy14-24 10YR 5/2 95 10YR 5/8 5 C
95 10YR 5/8 5 C
Hydric Soil Indicators: Indicators for Problematic Hydric Soils3:
Histosol (A1)
Polyvalue Below Surface (S8) (LRR R,
2 cm Muck (A10) (LRR K, L, MLRA 149B)
Coast Prairie Redox (A16) (LRR K, L, R)
5 cm Mucky Peat or Peat (S3) (LRR K, L, R)
Hydrogen Sulfide (A4) Thin Dark Surface (S9) (LRR R, MLRA 149B)
unless disturbed or problematic.
Polyvalue Below Surface (S8) (LRR K, L)
1Type:  C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. 2Location:  PL=Pore Lining, M=Matrix.
Thick Dark Surface (A12) Loamy Gleyed Matrix (F2) Piedmont Floodplain Soils (F19) (MLRA 149B)
Depleted Matrix (F3) Red Parent Material (F21) (outside MLRA 145)
Stratified Layers (A5) High Chroma Sands (S11) (LRR K, L) Thin Dark Surface (S9) (LRR K, L)
Depleted Below Dark Surface (A11) Loamy Mucky Mineral (F1) (LRR K, L) Iron-Manganese Masses (F12) (LRR K, L, R)
0-6 7.5YR 2.5/1 100
Histic Epipedon (A2)
Yes No
Remarks:
Plot located within the margins of naturalized, manmade stormwater basin.
Restrictive Layer (if observed):
Type: Stone/rock fill
Depth (inches):                   14 Hydric Soil Present?
Black Histic (A3)
Mesic Spodic (A17)
 (MLRA 144A, 145, 149B)
Stripped Matrix (S6)
Dark Surface (S7)
MLRA 149B)
Redox Depressions (F8)
Marl (F10) (LRR K, L)
Red Parent Material (F21) (MLRA 145)
3Indicators of hydrophytic vegetation and
wetland hydrology must be present, 
Sandy Gleyed Matrix (S4)
Other (Explain in Remarks)
Redox Dark Surface (F6)
Sandy Mucky Mineral (S1) Depleted Dark Surface (F7)
Very Shallow Dark Surface (F22)
Sandy Redox (S5)
ENG FORM 6116-8, JUL 2018 Northcentral and Northeast – Version 2.0

Page 51

 
 
 
Attachment D:  
Site Photographs 
  

Page 52

Att. D: Site Photographs
CT DOT 0055-0145
Photo 1. View of Bridge 04525 along Simsbury Road facing north.
Photo 2. Heavy stone armoring along the banks of the West Branch of Salmon 
Brook facing southeast toward Bridge 04525.

Page 53

Photo 3. The northern underside area between abutments of Bridge 04525 where 
floodplain (alluvial) soils were observed. Photo facing north.
Photo 4. View of the northern abutment along the bank of the West Branch of  
Salmon
 Brook facing east.
Att
. D: Site Photographs
CT DOT 0055-0145

Page 54

Photo 5. Section of unarmored shoreline along the West Branch of Salmon Brook 
upstream
 from Bridge 04525. Photo facing southeast.
Photo 6
. Floodplain and steep eroding slope along the West Branch of Salmon 
Brook u
pstream of Bridge 04525. Photo facing north.
Att
. D: Site Photographs
CT DOT 0055-0145

Page 55

Photo 7. Notable undercutting a the top the slope upstream of Bridge 04525. 
Photo 8. Intermittent watercourse located east of the intersection of Holcomb Hill 
Rd. and Simsbury Rd. Photo facing north toward flag IWC1-1.
Att. D: Site Photographs
CT DOT 0055-0145

Page 56

Photo 9. Small wetlands W1 adjacent to the intermittent watercourse IWC1. The 
wetland is separated from the watercourse by a manmade, stone overflow berm. 
Photo facing southeast.
Photo 10. Intermittent watercourse downstream of a small concrete culvert near flag 
IWC1-4.
Att. D: Site Photographs
CT DOT 0055-0145

Page 57

Photo 11. Intermittent watercourse running alongside a dirt path north of Bridge 
04525. Photo facing north.
Att. D
: Site Photographs
CT DOT 0055-0145

Page 58

 
 
 
Attachment E:  
Wetland Functions and 
Values Evaluation Forms 
  

Page 59

Wetland Function-Value Evaluation Form
Wetland I.D.
Wetland Impact:
Type Area
Evaluation based on:
Field
Function(s)/Value(s) Comments
X
ES
Notes: *Refer to backup list of numbered considerations.
Small, manmade stormwater basin
Very limited due to small size but present 
Very limited due to small size but present 
Mapped NDDB habitat as of Nov. 2024 mapping.
3,5,7,8,9,16
1,2,3,4
3,4,7,9,10
 Distance to nearest roadway or other development
1
Y
N
Y
Y
N
N
N
N
N
N
N
Y
Floodflow Alteration
Other
Endangered Species Habitat
Fish and Shellfish Habitat
Sediment/Toxicant Retention
Nutrient Removal
Production Export
Sediment/Shoreline Stabilization
Wildlife Habitat
Recreation
Educational/Scientific Value
Uniqueness/Heritage
Visual Quality/Aesthetics
Function/Value
Suitability Rationale       
completed? Y NX
N
Principal
or a "habitat island"?
Contiguous undeveloped buffer zone present
Wildlife & vegetation diversity/abundance (see attached list)
W1
41.9418
(Reference#)*Y/N
Office
Longitude
Prepared by:
PEM
Yes
Groundwater Recharge/Discharge
0
X X
Dominant wetland systems present
How many tributaries contribute to the wetland? Corps manual wetland delineation
DateAdjacent land use Agriculture and roadways
Latitude
20ft
-72.8342
No
No
Is the wetland a separate hydraulic system? If not, where does the wetland lie in the drainage basin?
TBDTBD
M.Ford 4/21/2025
Total area of wetland 0.01ac Human made? Yes Is wetland part of a wildlife corridor? No

Page 60

Wetland Function-Value Evaluation Form
Wetland I.D.
Wetland Impact:
Type Area
Evaluation based on:
Field
Function(s)/Value(s) Comments
X
ES
Notes: *Refer to backup list of numbered considerations.
No (Agriculture)
Is the wetland a separate hydraulic system? If not, where does the wetland lie in the drainage basin?
TBDTBD
M.Ford 4/21/2025
Middle
Total area of wetland 2+acres Human made? No Is wetland part of a wildlife corridor? Yes
X X
Dominant wetland systems present
How many tributaries contribute to the wetland? Corps manual wetland delineation
DateAdjacent land use Agriculture and forested
Latitude
0
-72.8343
Function/Value
Suitability Rationale       
completed? Y NX
Y
Principal
or a "habitat island"?
Contiguous undeveloped buffer zone present
Present due to persistent watercourse
Wildlife & vegetation diversity/abundance (see attached list)
W.Branch Salmon Brook
41.941
(Reference#)*Y/N
Office
Longitude
Prepared by:
R3UB1
No
Groundwater Recharge/Discharge
6+
Y
Y
Y
Y
Y
Y
Floodflow Alteration
Other
Endangered Species Habitat
Fish and Shellfish Habitat
Sediment/Toxicant Retention
Nutrient Removal
Production Export
Sediment/Shoreline Stabilization
Wildlife Habitat
Recreation
Educational/Scientific Value
Uniqueness/Heritage
Visual Quality/Aesthetics
1,2,4,7,12,15
2,6,13
7,8,10,12,14,15,16,17
1,2,6,8,9,10
4
1,2,3,4,6,8,9,15
 Distance to nearest roadway or other development
1
Y
Y
Y
Y
Y
Y
1,4,6,10,13
Limited but present mostely due to adjacent floodplain
Shallow stream but fish and benthic invertebrates observed. Habitat suitable 
but limited.
Retention limited but present during low-flow conditions
Limited due to sparse vegetation in channel
Limited but present, mostly along the banks.
Riverbank armored with stone in many places near the Bridge. Other areas 
upstream subject to erosion.
Limited but present mainly for aquatic species and foraging opportunities
Small parking area available for trail that runs near the river.
2,3,5,6,7,8,17
2,5,6,7,8,10
1,11,13
7,16,19,22,27
Limited but access available.
Limited but likely local significance
View from bridge and trail aestically pleasing
Mapped NDDB habitat (Nov. 2024)
5,7,8,10

Page 61

 
 
 
Attachment F: 
OHW Data Form 
 

Page 62

December 13, 2021 
Appendix A: OHW Data Form 
ORDINARY HIGH WATER MARK DELINEATION 
DATA FORM  (Part 1 – Field Work) 
Project #: Date: 
Town/Route: 
Watercourse/Waterbody (if available): 
Investigator(s): 
Mapping referenced: 
Weather Conditions at Investigation: 
Measurable precipitation in the past 72 hours?   Yes   No 
Other preceding events (i.e, hurricane, dam failure upstream, etc.) that would make physical indicators 
unreliable? (circle one)  Yes  No 
Observed Water Level: (circle one)     High   Typical    Low 
Notes: (Specify locations (generally) where physical indicators were located):(Example: Upstream of bridge had
the presence of litter and debris, shelving, and vegetation matted down.  Downstream of the bridge had the 
presence of scour, shelving and exposed roots.  Within the bridge/culvert water staining was present.) 
OHW marked at structure inlet       outlet  N/A
Photo Documentation Attached  
     (Depict on photos – any estimated OHW marks, flagging and physical indicators) 
Sketch Attached  (ensure sketch is sent to central surveys)
     (Depict on sketch – any estimated OHW marks, flagging and physical indicators) 
CT DOT 0055-0145 4/21/2025
Granby/Simsbury Rd.
West Branch of the Salmon Brook
M. Ford
2023 Aerial Imagery, USGS Topographic mapping
~50F and partly cloudy
Physical indicators of OHW up and downstream of Bridge 04525 include erosion/scour, bank
undercutting, root exposure, water staining, litter removal, and shelving.
Much of the riverbanks immediately up and downstream of the Bridge are armored and definitive 
water staining was sparse, however staining was evident on the Bridge abutments. OHW staked 
both up and downstream of the Bridge.
X X
X
X

Page 63

December 13, 2021 
Supporting Feature Identification Table 
Feature Description Interpretations Insert Check if 
Present 
Drift/wrack Debris deposited as streamflow 
recedes (typically during/following 
flood events); commonly forms linear 
features or piles and often collects on 
the upstream side of inundated 
vegetation or other flow barriers 
May indicate the spatial extent of a recent flow 
event; a concentration of drift features may suggest 
relatively frequent inundation. 
Erosion/scour The removal of sediment or rock due 
to mechanical forces (e.g., water or 
wind) 
Typically occurs within the active channel (i.e., below 
the OHWM) but can also result from extreme flood 
events or non-fluvial processes. 
Bank 
undercutting 
Erosion of channel banks beneath 
the ground surface such that a “roof” 
of sediment, roots, etc., remains 
Typically occurs within the active channel (i.e., below 
the OHWM); more commonly in entrenched streams. 
Root exposure Exposure of previously buried roots 
due to erosion; common along active 
channel banks, particularly on the 
outside of bends (meanders) 
Suggests the presence of active erosional 
processes; can also result from infrequent flood 
events. 
Point bars Depositional features found on the 
inside of stream bends (meanders). 
Suggests relatively frequent inundation; the tops of 
point bars typically occur below the OHWM. 
Water staining Staining or discoloring of natural 
(e.g., bedrock) or man-made (e.g., 
bridges) objects due to the frequent 
presence of water. 
In bedrock or colluvial channels or confined reaches 
where primary indicators cannot develop, water 
stains are sometimes the best or only indicator of 
ordinary flow conditions. However, they may indicate 
the most frequently experienced flow level (e.g., 
mean flow) rather than the ordinary extent of high 
flows, or they may indicate the spatial extent of a 
recent flood. 
Litter removal The removal of leaves, needles, and 
other organic ground cover due to 
flowing water 
May indicate the extent of recent flows (depending 
on the time of year) or may be useful for verifying 
streamflow in small or hard-to-detect streams. 
Silt deposits Deposition of fine sediments Generally depositional features rather than erosional 
ones. Silt deposits found on a floodplain often stand 
in contrast to the relatively course substrate of the 
active channel. 
Shelving The presence multiple “benches” and 
breaks in slope along the margins of 
the active channel. 
Suggests downcutting of the active channel. The 
lowest bench may represent an emerging floodplain. 
Headcut/ 
knickpoint 
An abrupt vertical drop in the stream 
bed that typically migrates upstream 
Sometimes indicates the upper, longitudinal extent 
of a headwater stream and the OHWM (i.e., the point 
of stream initiation). 
Macro- 
invertebrates 
Invertebrates (animals lacking 
vertebral columns) that are visible to 
the naked eye (e.g., aquatic insect 
larvae, clams, crayfish, aquatic 
worms, etc.) 
Certain aquatic species and aquatic life stages of 
macroinvertebrates have been found to be strongly 
tied to streamflow permanence (i.e., ephemeral vs. 
intermittent vs. perennial) in the Pacific Northwest 
(Mazzacano and Black 2008, Nadeau 2011, 
Blackburn and Mazzacano 2012). 
Note: Some potential supporting features and generalized interpretations of their utility for OHWM delineation purposes. 
These features do not generally indicate the precise location of the OHWM but may be useful as supplementary 
information (i.e., in addition to interpretation of primary indicators) for interpreting recent or long-term hydrologic 
and geomorphic conditions within a given stream system. This list is not exhaustive and other supporting features 
may occur 
X
X
X
X
X
X

Page 64

Att. E: OHW Photographs
CT DOT 0055-0145
Photo 1. OHW painted on the southern abutmentbeneath Bridge 04525 facing 
south.
Photo 2. OHW painted on the center abutment beneath Bridge 04525 facing north.

Page 65

Photo 3. OHW Stake placed at the shelf and transition from herbaceous to woody 
stems at OHW-5A.
Photo 4. Exposed roots along eroding bank near OHW-4 stake south of Bridge 04525.
Att. E: OHW Photographs
CT DOT 0055-0145

Page 66

Photo 5. OHW stake set amidst dense, boulder armoring along the riverbank.
Photo 6. View of the floodplain that extends beneath Bridge 04525 facing southeast.
Att. E: OHW Photographs
CT DOT 0055-0145

Page 67

#
##
# #
#
# #
# #
#
#
#
#
# #
#
##
#
#
#
#!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(
!(!(
")
")
")
")
")
")
")
")
")
")
")
")
")
!(
CT1-1
CT1-2
CT1-3
CT1-4
CT1-5
CT1-6
CT1-7
CT1-8
CT1-9
CT1-10
CT2-1
CT2-2
CT2-3
CT2-4
CT3-1
CT3-2
CT3-3
IWC1-1
IWC1-2
IWC1-3
IWC1-4
IWC1-5
IWC1-6
IWC1-7
W1-1
W1-2 W1-3
W1-4
W1-5
OHW-1
OHW-2
OHW-3
OHW-4
OHW-5
OHW-6
OHW-1A
OHW-2A
OHW-3A
OHW-4A
OHW-5A
OHW-6A
OHW-7A
www.ecomapsllc.com
/
1. Locations as shown are estimated
and for field location of flags only
.
2. Wetlands delineated by M. Ford
on April 21, 2025.
3. Centerline of narrow intermittent
watercourse (IWC 1) series flagged.
NotesWetland Sketch Map Legend
1 in. = 140 ft.
CT DOT 0055-0145
Simsbury Road
Gr
anby, CT
!( Wetland Flag
!( OHW Flag (no elevation)
") OHW Stake
# Federal Wetland Boundary
# CT-Only Wetland Boundary
Active Channel (OHW)
Intermittent Watercourse
CT Wetland
Delineation Limits (approx.)
Floodplain wetland
continues beneath
Bridge.
OHW indicators diffuse
on rocky
, floodplain island
between OHW-6A and 7A.
Very steep, eroding
slope.
Simsbury Rd.
Holcomb Hill Rd.
Centerline of narrow
(2-3 ft wide) intermit
tent
watercourse (IWC1).

Page 68

Federal Local Bridge Program: Bridge No. 04525  
Town of Granby IWWC Permit 
February 2026 
 
Permit Plans 
  

Page 69

Page 70

Page 71

Page 72

Page 73

Page 74

Page 75

Page 76

Federal Local Bridge Program: Bridge No. 04525  
Town of Granby IWWC Permit 
February 2026 
 
Drainage Report 

Page 77

 
 
 
REPLACEMENT OF BRIDGE NO. 04525  
SIMSBURY ROAD OVER WEST BRANCH OF 
SALMON BROOK 
GRANBY, CONNECTICUT 
 
 
 
DRAFT DRAINAGE REPORT 
 
Prepared For:  
State of Connecticut 
Department of Transportation 
Newington, Connecticut   
   
PREPARED BY: 
 
 
 EMILY A. RICE , P.E.  
CHECKED BY:  
 
 
 STEVEN D. GEORGE , P.E.  
 
DATE: OCTOBER 2025 
  
500 WINDING BROOK DRIVE 
GLASTONBURY, CT 06033 
  
WSP.COM

Page 78

 
 
 
Replacement of Bridge No. 04525 Simsbury Road Over West Branch Salmon Brook  WSP 
Drainage Report  Page i 
State Project No. 0055-0145 
Granby, Connecticut 
1 INTRODUCTION ................................................................................................................. 1 
1.1  Project Description ............................................................. 1 
1.2  Design Criteria Drainage Analysis ...............................2 
1.3  Design Criteria.......................................................................2 
2 PROJECT INFORMATION ............................................................................................. 3 
2.1  Existing Stormwater Drainage System 
Conditions ...............................................................................3 
3 STORMWATER DRAINAGE SYSTEM COMPUTATIONS ................................. 3 
3.1  Drainage Analysis and Design Methodology ..........3 
3.2  Storm Drainage System Computer Program ......... 4 
3.3  Proposed Drainage Improvements ............................ 4 
3.3.1  System 1 –Simsbury Road STA 18+16.00, 20.00’ RT +/- to STA 
17+89.00, 20.00’ LT +/- .............................................................................................. 4 
3.3.2  System 2 – Simsbury Road STA 16+36.00, 15.00’ RT +/- TO STA 
15+53.00, 43.00’ RT +/- .............................................................................................. 5 
3.3.3  Bridge 04525 Gutterflow ....................................................................................... 5 
4 ATTACHED SUPPORTING INFORMATION ........................................................... 6 
FIGURES 
FIGURE 1 – LOCATION PLAN ..................................................... 2 
APPENDICES 
A  CTDOT DRAINAGE SUBMISSION CHECKLIST  
B  HIGHWAY PLANS  
C  DRAINAGE AREA PLANS  
D  STORMWATER DRAINAGE HYDROLOGIC  
INFORMATION  
E  GUTTER FLOW ANALYSIS  
F  OPENROADS HYDRUALIC GRADE LINE ANALYSIS  
G  CTDOT MS4   FORM  
H  SLOPE PROTECTION AND SWALE CALCULATIONS  
I  OUTLET PROTECTION CALCULATIONS  

Page 79

 
 
 
Replacement of Bridge No. 04525 Simsbury Road Over West Branch Salmon Brook  WSP 
Drainage Report  Page 1 
State Project No. 0055-0145 
Granby, Connecticut 
1 INTRODUCTION 
WSP USA Inc. (WSP) has been engaged by the Connecticut Department of Transportation (CTDOT) through the Bridge On-
Call Task Order Program to provide engineering services for the replacement of Simsbury Road over West Branch of the 
Salmon Brook (Bridge No. 04525). in the Town of Granby, Connecticut in Hartford County.  
This report presents the stormwater and drainage analysis for Project No. 0055-0145; it provides design information, design 
criteria, and calculations documenting conformance of the proposed condition with the latest design standards as required 
by the CTDOTDM (Connecticut Department of Transportation Drainage Manual).  The drainage checklist is included in 
Appendix A. The most recent Highway Plans sheets have been included in Appendix B. See the 70% Design Submission 
Package submitted under separate cover for the profiles, cross sections, and drainage details. 
1.1  PROJECT DESCRIPTION 
The existing Bridge No. 04525 is a two-span structure that carries Simsbury Road over the West Branch of the Salmon Brook. 
The bridge is located approximately 0.2 miles north of the intersection of Simsbury Road with Firetown Road and carries 
one lane of traffic in the northbound and southbound directions northeast of the bridge. The existing bridge was constructed 
in 1956 and includes two 50’-10” long simple spans. The overall structure length is 111’-0” and the bridge has a 43-degree 
skew. The West Branch of Salmon Brook flows under the bridge from the west to the east mainly under the southerly Span 
1. 
The project limits start approximately 325 feet south of Bridge No. 04252 and extends approximately 600 feet north of the 
bridge. The project is located primarily within farmland. Within the project limits, adjacent properties include the Granby 
Land Trust, Inc on both the southwest and southeast side of the bridge; Salmon Brook Historical Society, Inc northwest of 
the bridge and; Katherine C. Dunnington northeast of the bridge. 
 
Project 0055-0145 includes the following work: 
• Replacement of existing Bridge No. 04525 with a new bridge structure including the demolition of the 
existing bridge including both substructures and superstructure. 
• Realignment and widening of Simsbury Road to include two 10-ft. travel lanes and two 5-ft shoulders for 
pedestrians and bicyclists and providing for a 30-ft. curb-to-curb roadway width on the bridge.    
• Modification of the horizontal alignment of the roadway to meet current standards. 
 
A location map of the project site is presented in Figure 1.  

Page 80

 
 
 
Replacement of Bridge No. 04525 Simsbury Road Over West Branch Salmon Brook  WSP 
Drainage Report  Page 2 
State Project No. 0055-0145 
Granby, Connecticut 
 
Figure 1 – Location Plan 
1.2  DESIGN CRITERIA DRAINAGE ANALYSIS 
The project’s drainage scope includes analysis of the drainage systems within the project limits and bridge gutter flow in 
the proposed condition with the final roadway and bridge geometry.  
1.3  DESIGN CRITERIA 
The design criteria used in the drainage evaluations was obtained from the Connecticut Department of Transportation 
Drainage Manual, January, 2000, as revised, unless otherwise noted. The Federal Highway Administration Hydraulics Design 
Series and Highway Engineering Circulars were used as directed by the Drainage Manual.  
The CTDOT Drainage Manual Table 11-2 provides Pavement Drainage Design Criteria for the design frequencies and 
allowable design gutter spread based on Roadway Classification, ADT, and Speed. 
Roadway drainage was designed and analyzed for a 10-year storm event and checked for the 25-year storm event. 
Simsbury Road is a rural town road with ADT <3000 vpd. Per Table 11-2 of the Drainage Manual, the allowable spread for this 
roadway type is the shoulder and half of a travel lane. 
There is a low-point at STA 10+38.00 +/-. 
SIMSBURY ROAD
HOLCOMB
HILL
BARNDOOR
HILL
ROAD
RD

Page 81

 
 
 
Replacement of Bridge No. 04525 Simsbury Road Over West Branch Salmon Brook  WSP 
Drainage Report  Page 3 
State Project No. 0055-0145 
Granby, Connecticut 
2 PROJECT INFORMATION 
2.1  EXISTING STORMWATER DRAINAGE SYSTEM CONDITIONS 
The existing information, including pipe size, inverts and pipe material was taken from a field survey conducted by CTDOT 
(Connecticut Department of Transportation). Elevation/contour information for drainage areas outside the surveyed 
boundaries was obtained from the State of Connecticut, “Connecticut Environmental Conditions Online” 2016 LiDAR-based 
Contours.  
Hydrologic Soil Groups were determined utilizing the United States Department of Agriculture (USDA) Natural Resources 
Conservation Service (NRCS) Web Soil Survey.  The NRCS Soil Survey Report is provided in Appendix D. 
There are two drainage systems and two points of interest for gutterflow within the roadwork project limits.  The drainage 
systems are labeled on Drainage Area Plans provided in Appendix C. 
The condition of the existing system outlets were not observed.  A field investigation and conditions assessment was not 
performed on the existing drainage structures and inlet and outlet facilities within the roadwork project limits.  At the time 
of this report, there are no known existing drainage issues with the existing systems or points of interest within the project 
limits. A field investigation and conditions assessment will be performed as the project design progresses, and this 
information will be included in a subsequent submission.  
System 1 is located on Simsbury Road and runs approximately from STA 18+16.00, 13.00 RT +/- to STA 17+89.00, 19.00' LT +/-
.  System 1 is a Type “L” endwall on the east side of the roadway that is connected by an 18” CMP to  a straight endwall 
structure on the west side of the roadway. The land draining to the existing endwall is rural area and mostly grasses with 
some residential houses and Simsbury Road.  The outlet discharges into a vegetated depression with no riprap outlet 
protection.  
System 2 is located on Simsbury Road and Holcomb Hill Road and runs approximately from STA 16+47.00, 5.00' RT+/- to STA 
15+85.00, 37.00' RT +/-. System 2 is a three catch basin system with 15” RCP connecting the first two catch basins and an 18” 
RCP connecting to an existing endwall.  The land draining to this system is rural area and mostly grasses with some 
residential houses and portions of Simsbury Road and Holcomb Hill Road.  The outlet discharges to the east into a subsequent 
system that then ultimately makes its way to the downstream side of West Branch Salmon Brook .  
Gutterflow along the curbed gutter line of  bridge no. 04525 discharges on the south side of the bridge at STA 12+62.00, 6.00' 
LT +/- and 12+41.00, 14.00' RT +/- respectively.   Flow at STA 12+62.00, 6.00 LT+/-  discharges to the west and ultimately makes 
its way to the upstream side of West Branch Salmon Brook. Flow at 12+41.00, 14.00' RT +/- discharges to the east and 
ultimately makes its way to the downstream side of West Branch Salmon Brook. There is no slope protection in place at the 
discharge locations.  
 
3 STORMWATER DRAINAGE SYSTEM 
COMPUTATIONS 
3.1  DRAINAGE ANALYSIS AND DESIGN METHODOLOGY 
The drainage design for State Project No. 0055-0145 has been developed to meet the requirements in the CTDOTDM and was 
modeled in OpenRoads Designer Subsurface Utility Design and Analysis (SUDA). The existing drainage information and flow 
patterns were obtained from the project survey annotations and contours. 

Page 82

 
 
 
Replacement of Bridge No. 04525 Simsbury Road Over West Branch Salmon Brook  WSP 
Drainage Report  Page 4 
State Project No. 0055-0145 
Granby, Connecticut 
The runoff coefficients used for the development of the flow were 0.95 for pavement, 0.17 for average sloped pervious areas 
in Hydrologic Soil Groups A and B. These numbers are consistent with Tables 6-3 and 6-4 of the CTDOT Drainage Manual. 
For most of the inlets and gutter points of interest on the road it was assumed that the Time of Concentration is the minimum 
of 5 minutes for pavement drainage areas as specified in the Drainage Manual. For the remaining areas, Time of 
Concentration paths were delineated and the time was calculated utilizing TR-55 methodologies. 
The Simsbury Road proposed gutters on the bridge were analyzed to determine the spread and depth during a 10-year 
frequency event checked for a 25-year frequency event.  
Alternative types of drainage pipe material were considered. 
Rainfall intensities were determined using the frequency/intensity/duration curves for the project site from the NOAA 
Precipitation Frequency Data Server website (https://hdsc.nws.noaa.gov/hdsc/pfds/index.html) for the project site. 
3.2  STORM DRAINAGE SYSTEM COMPUTER PROGRAM 
WSP utilized the Bentley computer program titled “Open Roads Designer CE – 2023”. This program performs pipe system 
and hydraulic grade line calculations using the HEC-22 methodology.  
Gutter and low point analysis was completed using HEC-22 methodology as required by the Drainage Manual.  
Slope protection calculations were completed using the Rational method and the Soil Erosion & Sediment Control Manual, 
September 2023. 
Swale and outlet protection analysis was completed using FlowMaster CONNECT Edition Update 3.    
3.3  PROPOSED DRAINAGE IMPROVEMENTS 
The model was analyzed for the 10-year and checked for the 25-year events.  The hydraulic grade line analysis tables and 
profiles are included in Appendix F.  
Minor drainage improvements are proposed for this project.  
3.3.1  SYSTEM 1 –SIMSBURY ROAD STA 18+16.00, 20.00’ RT +/- TO STA 17+89.00, 
20.00’ LT +/- 
System 1 will be fully replaced due to the widening of the roadway. The existing drainage infrastructure for this system will 
be removed. A new Type “L” endwall will be placed on the east side of the roadway at 18+16.00, 20.00’ RT +/- with an 18” RCP 
connecting to a straight endwall on the west side of the roadway at STA 17+89.00, 20.00’ LT +/-will be installed. 
The proposed pipe material is RCP. It has been CTDOT practice to replace existing CMP with RCP under the roadway. 
Drainage Rights of Way will be acquired for the proposed location of the new Type “L” endwall on the west side of the 
roadway outside the widened roadway limits at STA 18+16.00, 20.00’ RT +/-.  
A Type C riprap apron with modified riprap is proposed for outlet protection at the proposed straight endwall outlet at STA 
17+89.00, 20.00’ LT +/- since there is an existing defined channel at the existing outlet. The riprap apron and outlet pipe are 
sized for the 10-year design storm. Outlet protection calculations are provided in Appendix I. 

Page 83

 
 
 
Replacement of Bridge No. 04525 Simsbury Road Over West Branch Salmon Brook  WSP 
Drainage Report  Page 5 
State Project No. 0055-0145 
Granby, Connecticut 
3.3.2  SYSTEM 2 – SIMSBURY ROAD STA 16+36.00, 15.00’ RT +/- TO STA 15+53.00, 
43.00’ RT +/-  
The existing Type “C” catch basin on the east side of Simsbury Road located at STA 16+47.00, 5.00' RT +/- requires 
replacement due to the realignment and widening of the roadway at this location.  The existing Type “C” catch basin will 
be removed and replaced with a Type “C” catch basin at the new proposed edge of road, STA 16+36.00, 15.00’ RT +/-,  
A new vegetated swale is proposed to help direct the flow within the catchment area, reduce DCIA, and enhance storm 
water quality. A “V” shaped swale will be constructed starting just south of the proposed Type “L” endwall in System 1 and 
continuing to the proposed Type “C-L” catch basin location.   
A Type “C-L” catch basin will be added in the grass ditch southeast of the replaced Type “C” catch basin at STA 16+31.00, 
21.00' RT +/- to catch the flow in the proposed vegetated swale.  The “C-L” catch basin will be placed on the existing 
pipeline from Simsbury Road to the existing catch basin on the east side of Holcomb Hill Road at STA 16+10.00, 44.00' RT 
+/-. A new 15” RCP will be placed between the new Type “C” and Type “C-L” catch basins because of their proximity to 
each other.  
Replaced and new pipe is RCP to match the existing pipe material in this system. 
All catch basins in this system have more than 1 foot of freeboard from the hydraulic grade line to the top of grate during 
the 10-year and 25-year design storms.  
Type G erosion control matting will be used in the swale for the temporary condition until turf is established. Swale 
calculations are included in Appendix H.  
3.3.3  BRIDGE 04525 GUTTERFLOW 
The gutterflow spread along the west and east curbed gutter lines of the proposed bridge was analyzed for the 10-year storm 
and checked for the 25-year storm. The gutterflow along the curbed gutter line of the discharges on the south side of the 
bridge at the west side of the roadway at STA 12+71.00, 15.00’ LT +/- and on the east side of the roadway at STA 12+14.00, 
15.00’ RT +/-.  Flow at STA 12+71.00, 15.00’ LT +/- discharges to the west and ultimately makes its way to the upstream side 
of West Branch Salmon Brook.  Flow at STA 12+14.00, 15.00’ RT +/- discharges to the east and ultimately makes its way to the 
downstream side of West Branch Salmon Brook. 
 The 10-year flow is approximately 0.770 CFS at the southwest and 0.200 CFS at the southeast parapet ends of the bridge, 
respectively. Gutterflow analysis for the 10-year storm event indicates gutterflow spread of approximately 4.3 feet on the 
west curbline and 2.8 feet on the east curbline.  Allowable gutter spread calculations accounted for the shoulder and half of 
a travel lane, therefore the gutterflow spread will be contained within the shoulders. Therefore, inlets are not proposed 
within the bridge structure. The gutterflow calculations are included in Appendix E. 
To mitigate any potential for erosion where the curbed gutter lines on the bridge discharge, crushed stone for slope 
protection is proposed along the slope immediately downstream of the west side of the roadway and along the end of the 
bridge parapets at STA 12+71.00, 15.00’ LT +/- and the slope immediately downstream of the east side of the roadway at STA 
12+14.00, 15.00’ RT +/-.   Calculations for allowable velocities for various soil textures are included in Appendix H.  
 
 
 
 

Page 84

 
 
 
Replacement of Bridge No. 04525 Simsbury Road Over West Branch Salmon Brook  WSP 
Drainage Report  Page 6 
State Project No. 0055-0145 
Granby, Connecticut 
4 ATTACHED SUPPORTING 
INFORMATION 
The CTDOT Drainage Submission Checklist is provided in Appendix A. 
The Highway Plans are provided in Appendix B. 
The Drainage Area Plans for the stormwater drainage analysis is provided in Appendix C.  
The Stormwater Drainage Hydrologic Information including the NOAA Atlas 14 Data, NRCS Soil Survey Report, Runoff 
Coefficient Calculations, and Time of Concentration Calculations are provided in Appendix D.  
The Gutter Flow Analysis is provided in Appendix E. 
The OpenRoads Hydraulic Grade Line Analysis is provided in Appendix F. 
The CTDOT MS4 Form is provided in Appendix G.  
The Slope Protection and Swale Calculations are provided in Appendix H.  
The Outlet Protection Calculations are provided in Appendix I.

Page 85

APPENDIX 
 
 
A CTDOT 
DRAINAGE 
SUBMISSION 
CHECKLIST  

Page 86

Design Development  3.B-5 
January 2001  ConnDOT Drainage Manual 
 
Project No.        
Roadway        
Town         
Date         
Designed By        
Signature of Engineer       
 
Drainage Design Checklist (Plans 50% Complete) 
 
Allow a 6-8 week review time 
 
See Note below. 
 
Semi-Final Design Checklist (Plans 60% to 70% Complete) 
 
Allow a 5-6 week review time 
 
Note:  A separate, earlier drainage submission (at approximately 50% completion) may be 
required if the drainage design is particularly  complicated, requires si gnificant right of way 
and/or otherwise might jeopardize the schedule of the project.  This checklist MUST 
accompany both of these submissions. 
 
Indicate which submission this checklist is for and include the following information: 
 
 Drainage Design Submission   Semi-Final Design Submission 
 
a. Draft Drainage Report  
 
1. Disposition of Preliminary Design/Drainag e Design Submission co mments with written 
responses justifying comments not incorporated. 
 Included   Not Included   Not Applicable 
2. A condition survey of the existing drainage pipes and structures that are to remain in use 
should be investigated for structural adequacy and documented. (See Section 3.6.3.) 
 Included   Not Included   Not Applicable 
3. The condition of existing ditc hes that are to remain in us e should be field inspected, 
analyzed and results documented to verify their stability and the need for cleaning and 
reshaping. 
 Included   Not Included   Not Applicable 
4. The condition of the outlet at the existing di scharge points should be investigated and 
documented to ensure no erosion or sediment  problems exist.  If  outlet protection is 
required, it should be incorporated into the project and computations submitted. 
 Included   Not Included   Not Applicable 
0055-0145
Simsbury Road
Granby
10/15/2025
Emily Rice
**
X
X
X
** Response to comments included with the 70% Design Submission Package.
X

Page 87

3.B-6  Design Development  
ConnDOT Drainage Manual  March 2008 
 
5. A condition survey report including items 2, 3, and 4 above. (See Appendix A and B, 
Chapter 4) 
 Included   Not Included   Not Applicable 
6. Drainage design computations should includ e gutter flow analysis , storm sewer design, 
and hydraulic gradeline (HGL).  The hydraulic gradeline should be analyzed to ensure 
0.3m (1 ft) freeboard is maintained at drainage  structures.  This analysis should consider 
all friction, entrance, junction, exit and bend losses.  Designer to verify that the proposed 
drainage will not adversely impact the exis ting downstream storm system or property 
owners. (See Chapter 11, Storm Drainage Systems.) 
 Included   Not Included   Not Applicable 
7. Drainage computations should identify struct ures by station and offset rather than by a 
numerical identifier.  If sta tion and offset is not feasible  for the computations then 
include an index with the location of the structure co rresponding to its numerical 
identifier.  The watershed map should be prepared accordingly. 
 Included   Not Included   Not Applicable 
8. Existing drainage systems shall be analyz ed for hydraulic adequacy to meet the 
proposed conditions and, if found inadequate, an  upgrade will be  designed in 
conformance with the criteria established in the Drainage Manual. 
 Included   Not Included   Not Applicable 
9. All roadway drainage systems should be brought to a suitable outlet. 
 Included   Not Included   Not Applicable 
10. If upgrading of pipes downstream of the proj ect is necessary, then additional rights may 
need to be acquired.  
 Included   Not Included   Not Applicable 
11. The need for temporary drainage should be addressed.  Temporary drainage 
computations should be prepared in accord ance with criteria in the Drainage Manual. 
(See Section 3.6.11.) 
 Included   Not Included   Not Applicable 
12. Proposed swales, ditches and channels should be designed in accordance with HEC-15 
for discharges 1.42 m 3/s (50 ft 3/s) and less or HEC-11 for discharges in excess of 1.42 
m3/s (50 ft3/s). (See Chapter 7, Channels.) 
 Included   Not Included   Not Applicable 
13. Minor and small cross culvert design comput ations with culvert data sheet. (See 
Chapter 8, Culverts.) 
 Included   Not Included   Not Applicable 
14. Topographic mapping with watershed area delineated for each inlet and/or cross culverts 
as required to perform the drainage calculatio ns.  The flow path us ed in the time of 
concentration calculation and coefficient of  imperviousness should be shown for each 
area. (See Chapter 6, Hydrology.) 
 Included   Not Included   Not Applicable 
15. Diversion identified. 
 Included   Not Included   Not Applicable 
16. All plans, computations and reports identify the responsible engineers who prepared and 
checked the work. 
 Included   Not Included   Not Applicable 
17. Alternate types of drainage pipe material have been considered and documented. 
 Included   Not Included   Not Applicable  
X
X
X
X
X
X
X
X
X
X
X
X
X

Page 88

Design Development  3.B-7 
October 2000  ConnDOT Drainage Manual 
 
b. Plans, Profiles and Cross Sections 
 
1. The existing and proposed storm drainage shown to their outlets. 
 Included   Not Included   Not Applicable 
2. Size and type of existing drainage pipes/structures and disposition of pipes/structures to 
be abandoned. 
 Included   Not Included   Not Applicable 
3. Properties affected by diversions should be shown on the plans so that proper rights can 
be acquired. 
 Included   Not Included   Not Applicable 
4. Drainage Rights and Easements. 
 Included   Not Included   Not Applicable 
5. Outlet Protection shown on plans and details provided. 
 Included   Not Included   Not Applicable 
6. Intersection grading plans to ensure inlets are located at  the low points to alleviate 
ponding/icing conditions.  Top of frame elevation should be shown. 
 Included   Not Included   Not Applicable 
7. In areas where cross culverts are being extend ed, replaced, or where outlet protection is 
proposed a profile or cross section of the natural ground should be provided to show 
how the inverts will tie into the existing topography. 
 Included   Not Included   Not Applicable 
8. The top of frame and invert elevations fo r each storm drainage structure shown.  
Proposed drainage structures shall be identified by station and offset on cross sections. 
 Included   Not Included   Not Applicable 
9. Existing and proposed drainage patterns (flo w arrows) of pipes, ditches, channel and 
swales. 
 Included   Not Included   Not Applicable 
10. Details for any special drainage structures not found in the Standard Drawings. 
 Included   Not Included   Not Applicable 
11. The direction of flow should be shown by a rrows to 61m (200 ft.)  beyond any drainage 
outlet, or shown to terminate by dissipation or entrance into a watercourse or body of 
water. 
 Included   Not Included   Not Applicable 
 
c. Structures with drainage areas > 2.59 km2 (1 mi2)  
 
1. Draft hydraulic design report. 
 Included   Not Included   Not Applicable 
2. Draft scour report when the proposed structure spans the waterway. 
 Included   Not Included   Not Applicable 
3. Draft floodway report. 
 Included   Not Included   Not Applicable 
4. Draft SCEL report. 
 Included   Not Included   Not Applicable 
5. Draft scour report if required. 
 Included   Not Included   Not Applicable 
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

Page 89

3.B-8  Design Development  
ConnDOT Drainage Manual  October 2000 
 
Provide justification for items Not Included.  Justification should correspond to letter and number. 
 
_______________________________________________________________________________
_______________________________________________________________________________
_______________________________________________________________________________
_______________________________________________________________________________
_______________________________________________________________________________
_______________________________________________________________________________ 
a.2, 4 & 5 Existing survey condition investigation of the drainage systems will be performed
subsequent to this submission and incorporated for the next submission.
C.1. Not included, done by consultant liaison and submitted under separate cover.

Page 90

 APPENDIX 
 
B HIGHWAY 
PLANS 
  

Page 91

CROSS SECTIONSXSC-01 TO XSC-04
GRADING AND LANDSCAPING PLANGLP-01
PROFILEPRO-01
HIGHWAY PLANHWY-01
EROSION CONTROL MEASURES AT CATCH BASINS - FIBER ROLL AND SILT SACKMDS-03
CONCRETE WASHOUT AREA AND TYPE C RIPRAP APRONMDS-02
SEDIMENTATION CONTROL SYSTEMSMDS-01
BASELINE LAYOUT PLAN, BASELINE TIES AND BENCH MARKSALN-01
SUPERELEVATION DIAGRAMSED-01
GENERAL NOTES AND LEGENDGEN-01
TYPICAL SECTIONSTYP-01
INDEX OF DRAWINGSINX-01
DRAWING TITLEDRAWING NUMBERDRAWING TITLEDRAWING NUMBER
INDEX OF DRAWINGS
03 - HIGHWAY
GLASTONBURY, CT  06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
 DRAWING TITLE:
INX-01
TOWN(S):
 
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD 
PLOTTED DATE:
c:\bms\2\lbususer\d0161588\HW_CP_0055-0145_INX-01.dgn   FILE NAME: USJH683007  LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
      
      
      
      
      
      
        
        
        
        
        
        
                                        
                                        
                                        
                                        
                                        
                                        
0055-0145
DESIGNER/DRAFTER: JLD CHECKED BY: JAH
INDEX OF DRAWINGS
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
 
03.01

Page 92

 
    
 
2:1 MAX
GROUND
APPROX EXISTING
A
B
2% 2%
LANE
10'
SHLDR
5'*
LANE
10'
SHLDR
5'*
(SEE NOTE 3)
2:1 MAX
F
G
B SIMSBURY ROADL
SIMSBURY ROAD - NORMAL CROWN SECTION
** SLOPE VARIES FROM 2% TO 4% - SEE CROSS SECTIONS
*SHOULDER WIDTHS VARIES EXISTING TO 5' FROM STA 9+75 TO 11+00
STA 9+75 TO STA 12+48
12:1
    
LANE
10'
SHLDR
5'
B SIMSBURY ROADL
LANE
10'
SHLDR
5'
12:1
e%**
e%**
GROUND
APPROX EXISTING
MAX
2:1 12:1 MAX 2:1
SIMSBURY ROAD - BANKED LEFT
** SLOPE VARIES (SEE NOTE 2)
STA 12+48 TO STA 16+05
 
    
GROUND
APPROX EXISTING
EXIST
MATCH
EXIST
MATCH
  
LANE
VARIES
B SIMSBURY ROADL
LANE
VARIES
 
SIMSBURY ROAD - MILL AND OVERLAY
STA 19+00 TO STA 19+50
STA 9+25 TO STA 9+75
LEGEND:
B
A
C
D
COST OF GRANULAR FILL AND GRAVEL FILL  INCLUDED IN GRAVEL DRIVEWAY ITEM. SEE SPECIAL PROVISION.5.
SEE DRAWING NO. GLP-01 FOR SEEDING TYPE.4.
SEE CROSS SECTIONS FOR SIDE SLOPES.3.
SLOPE VAERIES, SEE SUPERELEVATION DIAGRAM ON DRAWING NO. SED-01.2.
FOR LIMITS, SEE DWG. NO. HWY-01.1.
NOTES:
E
F
A
B
2" 4"
PAVEMENT STEP DETAIL
6" GRAVEL ON 4" GANULAR FILL (SEE NOTE 5)
CUT BITUMINOUS CONCRETE PAVEMENT
2" HMA S0.5 TRAFFIC LEVEL 2 
FINE MILLING OF BITUMINOUS CONCRETE (0" TO 4")
POINT OF APPLIED GRADE
4" TOPSOIL AND SEEDING (SEE NOTE 4)
METAL BEAM RAIL (R-B MASH) (SEE NOTE 1)
6" PROCESSED AGGREGATE
BITUMINOUS CONCRETE LIP CURBING
12" SUBBASE AND FORMATION OF SUBGRADE
4" HMA S1 TRAFFIC LEVEL 2 (PLACED IN ONE LIFT)
4" HMA S0.5 TRAFFIC LEVEL 2 (PLACED IN TWO EQUAL LIFTS)
G
H
I
 
SHELF
4'
12:1
SHELF
4'
C
H
G E E
2"
A
LIFT 1
C
LIFT 2
A
G
E
C
B
E
H F
SHELF
4'
SHELF
4'
G
F
4% MAX
7%-e
    
LANE
10'
B SIMSBURY ROADL
LANE
10'
12:1
e%**
e%**
GROUND
APPROX EXISTING
MAX2:1
SIMSBURY ROAD - BANKED RIGHT
 
A
G
C
B
SHELF
4'
SHELF
4'
4% MAX
7%-e
12:1(SEE NOTE 3)
VARIES
** SLOPE VARIES (SEE NOTE 2)
FROM STA 17+00 TO 19+00
*SHOULDER WIDTHS VARIES 5' TO EXISTING
STA 16+05 to STA 19+50
I
J
G
J
GLASTONBURY, CT  06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
DRAWING TITLE:
TYP-01
TOWN(S):
 
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD 
PLOTTED DATE:
c:\bms\2\lbususer\d0161588\HW_CP_0055-0145_TYP-01.dgn   FILE NAME: USJH683007  LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
      
      
      
      
      
      
        
        
        
        
        
        
                                        
                                        
                                        
                                        
                                        
                                        
0055-0145
DESIGNER/DRAFTER:DG/JLD CHECKED BY:JAH
TYPICAL SECTIONS
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
 
 
0
1" = 8'
HORIZONTAL SCALE
8' 16'
**4% **4%
H
F
 H
5'*
SHLDR
5'*
SHLDR
 
    
GROUND
APPROX EXISTING
EXIST
MATCH
EXIST
MATCH
  
LANE
VARIES
B HOLCOMB HILL ROADL
LANE
VARIES
 
HOLCOMB HILL ROAD
STA 50+30 TO STA 50+44
H
1
1.5
J
I
K K
K
MILL AND OVERLAY CONSTRUCTION LIMIT
ROADWAY PAVEMNT TRANSITION DETAIL
STA 50+30 TO STA 50+44
STA 19+00 TO STA 19+50
STA 9+25 TO STA 9+75
A
C
B
FULL DEPTH PAVEMENT
RECONSTRUCTION
MILL AND OVERLAY
(SEE PLANS FOR LIMIT)
EXIST. PAVEMENT
TO REMAIN
N.T.S.
D D
 
    
GROUND
APPROX EXISTING
EXIST
MATCH
EXIST
MATCH
  
LANE
VARIES
B HOLCOMB HILL ROADL
LANE
VARIES
 
HOLCOMB HILL ROAD - MILL AND OVERLAY
STA 50+30 TO STA 50+44
I
J
H
D D
A
C
B
SLOPE PROTECTION
6" CRUSHED STONE FOR
6" GRANULAR FILL
VARIES
2 MAX,
1
SLOPE PROTECTION DETAIL
N.T.S.
L
L
GRAVEL DRIVEWAY
SEE PLANS
VARIES
03.02

Page 93

ENGINEER AND THE TOWN MUST BE NOTIFIED WHEN THIS IS DONE.)
THE CONTRACTOR SHALL RESET ANY DISTURBED MONUMENTS IDENTIFIED ON THE PLANS TO THE PROPER ELEVATION AND LOCATION AT HIS OWN EXPENSE. (THE 7.
WATER FOR DUST CONTROL SHALL BE USED, OTHER MEANS WILL REQUIRE TOWN APPROVAL PRIOR TO USE.6.
FROM POSSIBLE LEAKS. CONTRACTOR SHALL HAVE A SPILL KIT ON SITE AT ALL TIMES.
CHEMICALS NEEDED AT THE SITE SHALL BE STORED IN A SECONDARY CONTAINER AT LEAST 50' FROM WETLANDS OR WATERCOURSES TO PREVENT CONTAMINATION 
ANY MAINTENANCE OR REFUELING OF EQUIPMENT AND VEHICLES SHALL BE PERFORMED AT LEAST 50' FROM WETLANDS OR WATERCOURSES. OIL, GASOLINE, AND 5.
OF SUCH WORK.
THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH THE APPROPRIATE UTILITY COMPANIES REGARDING RESETTING OF THEIR FACILITIES AND SCHEDULING 4.
SOIL AND EROSION AND SEDIMENT CONTROL" AND IN ALL CASES, BEST MANAGEMENT PRACTICES SHALL PREVAIL.
COVER STABILIZATION IS ESTABLISHED. ALL SEDIMENT AND EROSION CONTROL MEASURES SHALL CONFORM TO THE MARCH 30, 2024 CONNECTICUT GUIDELINES FOR 
SEDIMENT AND EROSION CONTROL MEASURES AS DEPICTED ON THE PLANS SHALL BE IMPLEMENTED PRIOR TO CONSTRUCTION AND MAINTAINED UNTIL PERMANENT 3.
THE ATTENTION OF THE ENGINEER IMMEDIATELY FOR DETERMINATION.
ALL DIMENSIONS AND ELEVATIONS SHOULD BE VERIFIED IN THE FIELD BY THE CONTRACTOR PRIOR TO CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO 2.
4455.
APPROXIMATE. THE LOCATION OF ALL EXISTING UTILITIES SHOULD BE CONFIRMED PRIOR TO BEGINNING CONSTRUCTION. CALL "CALL BEFORE YOU DIG: 1-800-922-
THE LOCATIONS OF EXISTING UTILITIES HAS BEEN BASED UPON AVAILABLE INFORMATION AND MAY BE INCOMPLETE AND WHERE SHOWN, SHOULD BE CONSIDERED 1.
GENERAL NOTES
THE TOWN SHALL MAINTAIN ALL PAVEMENT MARKINGS.3.
CONSTRUCTION OR AS DIRECTED BY THE ENGINEER.
PAVEMENT MARKINGS SHALL BE INSTALLED THROUGHOUT THE PROJECT LIMITS OF CONSTRUCTION. MATCH EXISTING PAVEMENT MARKINGS AT THE LIMITS OF 2.
MARKINGS FOR NON FREEWAYS".
PAVEMENT MARKINGS SHALL BE INSTALLED IN ACCORDANCE STANDARD SHEET NO. TR-1210_04 "PAVEMENT MARKING LINES AND SYMBOLS" AND TR-1210_08 "PAVEMENT 2.
STOP BAR: ITEM - 12010106 - 12" WHITE EPOXY RESIN PAVEMENT MARKINGS
4" DOUBLE YELLOW CENTER LINE: ITEM 1210102 - 4" YELLOW EPOXY RESIN PAVEMENT MARKINGS
4" WHITE EDGE LINE: ITEM 1210101 -4" WHITE EPOXY RESIN PAVEMENT MARKINGS
FINAL PAVEMENT MARKINGS SHALL BE EPOXY RESIN. PAID FOR UNDER THE FOLLOWING ITEMS.1.
PAVEMENT MARKING NOTES
EXISTING CATCH BASIN" AND CLEAN EXISTING CULVERT - 12" TO 42" DIAMETER.
"NOT IN CONTRACT" SHALL BE CLEANED UNLESS OTHERWISE NOTED. THIS WORK TO BE PAID FOR UNDER THE RESPECTIVE CONTRACT ITEMS "CLEAN 
ALL EXISTING DRAINAGE STRUCTURES AND PIPES/CULVERTS WITHIN THE PROJECT LIMITS THAT ARE PROPOSED TO REMAIN ARE ARE LABELED NOT 3.
586_01.
DEPRESSION. THE CONTRACTOR SHALL DEPRESS THE CATCH BASIN AS SHOWN ON THE APPLICABLE DETAIL ON HIGHWAY STANDARD SHEET NO. HW-
THE TOP OF FRAME ELEVATIONS SHOWN FOR STRUCTURES AT GUTTER LINE REPRESENTS THE GUTTERLINE ELEVATION WITHOUT ANY REQUIRED 2.
DRAWING NO. MDS-03 FOR DETAILS.
SEDIMENT CONTROL SYSTEM AT CATCH BASINS TO BE INSTALLED IN EXISTING AND PROPOSED CATCH BASINS WITHIN THE PROJECT LIMITS. SEE 1.
DRAINAGE NOTES
WHERE NEW ONES ARE INSTALLED. PAID UNDER ITEM NO. 0930003.
STANDARD SHEET HW-930_01 "OBJECT MARKER (MAINTENANCE)". EXISTING OBJECT MARKER TO BE REMOVED IN AREAS
THE CONTRACTOR SHALL INSTALL OBJECT MARKER (MAINTENANCE) WITHIN THE PROJECT LIMITS IN ACCORDANCE WITH3.
INCLUDED UNDER SING FACE-SHEET ALUMINUM (TYPE XI RETROREFLECTIVE SHEETING). 
INSTALL RED RETROREFLECTIVE STRIP (SIGN NO. 31-5004) ON RELOCATED POST. COST 
RELOCATED SIGN TO BE PAID FOR UNDER REMOVAL AND RELOCATION OF EXISTING SIGNS2.
AND RETROREFLECTIVE STRIP DETAILS" AND SHEET NO. TR-1208_02 "METAL SIGN POSTS AND SIGN MOUNTING DETAILS".
RELOCATED STOP SIGN SHALL BE INSTALLED ON A NEW POST IN ACCORDANCE WITH CTDOT STANDARD SHEET NO. TR-1208_01 "SIGN PLACEMENT 1.
SIGNING NOTES
LIMIT OF MILL AND OVERLAY
CRUSHED STONE FOR SLOPE PROTECTION
PROCESSED AGGREGATE
GRAVEL DRIVEWAY
TURF ESTABLISHMENT - LAWN
4" TOPSOIL AND CONSERVATION SEEDING FOR SLOPES
CONTROL MATTING TYPE G AT DITCHES.
4" TOPSOIL AND CONSERVATION SEEDING WITH EROSION
CONTROL MATTING TYPE D ON SLOPES 3H:1V AND STEEPER
4" TOPSOIL AND CONSERVATION SEEDING WITH EROSION
APPROXIMATE FILL LINE
APPROXIMATE CUT LINE
TAKING LINE
SINGLE POST-MOUNTED SIGN
SEDIMENTATION CONTROL SYSTEM AT CATCH BASIN
STATED/FEDERAL WETLANDS
ORDINARY HIGH WATER
SEDIMENTATION CONTROL SYSTEM
LEGEND
GLASTONBURY, CT  06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
DRAWING TITLE:
GEN-01
TOWN(S):
 
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD 
PLOTTED DATE:
c:\bms\2\lbususer\d0161588\HW_CP_0055-0145_GEN-01.dgn   FILE NAME: USJH683007  LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
      
      
      
      
      
      
        
        
        
        
        
        
                                        
                                        
                                        
                                        
                                        
                                        
0055-0145
DESIGNER/DRAFTER: JLD CHECKED BY: JAH
LEGEND
GENERAL NOTES AND 
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
 
COMPROMISED BY GRADING ACTIVITIES.
VEGETATION AT EDGE OF CLEARING LIMITS TO BE EVALUATED, DEAD OR DYING TREES WITHIN ROW TO BE REMOVED, AS WELL AS ANY WHICH WOULD BECOME 4.
MATTING TYPE D.
EMBANKMENT SLOPES 3H:1V AND STEEPER TO RECEIVE 4" TOPSOIL AND CONSERVATION SEEDING FOR SLOPES INCLUDING EROSION CONTROL 3.
AND MAKE ANY ADJUSTMENTS PRIOR TO CLEARING AND GRUBBING.
THE CONTRACTOR SHALL NOT PERFORM TRIMMING OR CLEARING WITHOUT CONTACTING THE TOWN OF GRANBY A MINIMUM OF TWO WEEKS IN ADVANCE TO REVIEW 2.
PLANS.
ALL AREAS DISTURBED BY CONSTRUCTION SHALL RECEIVE 4" OF TOPSOIL AND CONSERVATION SEEDING FOR SLOPES UNLESS OTHERWISE NOTED OR IDENTIFIED ON THE 1.
LANDSCAPING NOTES
FOR LEGEND OF EXISTING FEATURES, SEE TITLE SHEET
03.03

Page 94

0
HORIZONTAL SCALE IN FEET
40 80
0
VERTICAL SCALE IN FEET
0.4 0.8GLASTONBURY, CT  06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
 DRAWING TITLE:
SED-01
TOWN(S):
 
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD 
PLOTTED DATE:
c:\bms\2\lbususer\d0161588\HW_CP_0055-0145_SED-01.dgn   FILE NAME: USJH683007  LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
      
      
      
      
      
      
        
        
        
        
        
        
                                        
                                        
                                        
                                        
                                        
                                        
0055-0145
DESIGNER/DRAFTER: DG CHECKED BY: JAH
SUPERELEVATION DIAGRAM
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
 
11+00 12+00 13+00 14+00 15+00 16+00
PT 15+41.82
PC 16+62.52
PC 13+72.15
PT 11+80.80
PC 9+93.09
17+00
-0.6 10' LT
0.54 10' LT
-0.2 10' LT & RT
0.6 10' RT
-0.54 10' RT
12+48
13+31
15+00
14+13
18+00
17+00
-0.4 15' LT & RT
0.55 15' RT
-0.9 15' LT
10+009+00
S=0.48% S=0.57%
13+51
0.10' 15' LT
13+72
-0.6 15' LT
15+35
-0.6' 15' LT
15+52
0.1 15' RT
16+76
-0.6 15' RT
16+58
0.10' 15' LT
19+00
13+64.70
BRIDGE ENDS
12+54.57
BRIDGE BEGINS
9+75
-0.25 12' LT&RT
9+25
-0.44± 12' LT&RT
LT & RT LANE WIDTH
TRANSITION  12' TO 10 '
MATCH EXIST.
TRANS. TO 
-0.78 14.6' RT
-0.72 13.25' RT
-0.81 15' RT
-0.61 11.3' RT
-0.59 10.8' RT
0.47 14.3' LT
0.54 13.4' LT
0.58 12' LT 0.27 11.2' LT
0.46 15' LT
0.31± 11.6'± LT
-0.31± 11.6'± RT
 
TRANSITION 0'TO 5'
LT AND RT SHOULDER
RT AND LT SHOULDER TRANS. 5' TO 0' 
 
10' TO 11.6'±
LT AND RT LANE TRANS. 
03.04

Page 95

BRIDGE #4525
ABUT #2 ABUT #1 PIER
PARAPET
PARAPET
DBL YELLOW
DBL YELLOW
         
 
 
 
 
 
 
 
 
 
         
 
 
 
 
 
 
  
 
N
 
9
0
3
6
0
0
N
 
9
0
3
6
0
0
         
 
 
 
 
 
 
 
 
 
         
 
 
 
 
 
  
 
 
N
 
9
0
4
0
0
0
N
 
9
0
4
0
0
0
E 976800
E 976800
E 977200
E 977200
Y
E
LLO
W
D
B
L
CP-2
CP-5
CP-6
BOXES
SPLICE
ELEC
 B.M. 2
MAG NAIL IN DRILL HOLE IN THE
SOUTHWEST CORNER OF
BRIDGE #04525 PARAPET
Elev. 295.345 
 NAVD 1988  
 B.M. 1
BRASS DISK IN TOP OF
CONCRETE MONUMENT
                                          
Elev. 311.790 
 NAVD 1988  
(FND)
IP
(FND)
MON
 
A
P
P
R
O
X
. LO
C
. C
A
B
LE
 
T
V
 
D
U
C
T
 
A
P
P
R
O
X
. LO
C
. 3
" E
LE
C
. D
U
C
T
 
A
P
P
R
O
X
. LO
C
. TE
L D
U
C
T
(FND)
MON
BARN
FRAME
STORY
1 1/2
CP-2
CP-5
CP-6
 B.M. 2
MAG NAIL IN DRILL HOLE IN THE
SOUTHWEST CORNER OF
BRIDGE #04525 PARAPET
Elev. 295.345 
 NAVD 1988  
 B.M. 1
BRASS DISK IN TOP OF
CONCRETE MONUMENT
                                          
Elev. 311.790 
 NAVD 1988  
N=903067.880
E=976920.331
CP-1 (IP)
N=903602.882
E=977017.837
CP-2 (IP)
N=904433.648
E=977073.425
CP-3 (IP)
N=904961.574
E=977044.262
CP-4 (IP)
SIMSBURY RD
 
 
 
 
 
 
EDGE OF BIT
MAG IN
R
IV
E
R
SIMSBURY RD
POST
WOOD
MAG IN
DH
MAG IN
 
 
 
 
 
 
BARN
RED
SIMSBURY RD
 
 
 
 
 
 
EDGE OF BIT
MAG IN
OF BARN
CORNER
TACK IN
SIMSBURY RD
 
 
 
 
 
 
FLAG POLE
FACE OF
HEADWALL
CORNER OF
DH IN
OF BIT
EDGE
MAG IN
#3216
CL&P
MAG IN
#786
CL&P
MAG IN
9.22'
61.88' 87.12' #784
CL&P
MAG IN
41.96'
6.22'
30.35'
1.47'
37.94'
3
5
.7
2
'
#778
CL&P
MAG IN
2.58'
4.85'49.11'
N=903885.019
E=977083.074
CP-5 (IP)
N=904132.323
E=977026.373
CP-6 (IP)
 
 
 
 
 
 
2
9
.3
2
'
13
.65
'
4
0
.9
3
'
SIMSBURY RD
HILL RD
HOLCOMB
ROCK
DH IN
18" MAPLE
MAG IN
 
 
 
 
 
 
SIMSBURY RD
HILL RD
HOLCOMB
7
.6
2
' 23.92'
4
4
.12
'
15" MAPLE
MAG IN
IN HEADWALL
DH W/MAG
#781
CL&P
MAG IN
#783
CL&P
NAIL IN
SALMON  BROOK
SIMSBURY ROAD
H
ILL R
O
A
D
H
O
LC
O
M
B
W
EST   BR
AN
C
H
8
3
COORDINATE GRID
A
D
           
CONNECTICUT
               
E 977060.614
N 904309.296
STA. 19+50
MATCH EXISTING PAVEMENT MARKINGS
END MILL AND OVERLAY - MEET EXITING PAVEMENT
CUT BITUMINOUS CONCRETE PAVEMENT
END PROJECT NO. 0055-0145
GLASTONBURY, CT  06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
 DRAWING TITLE:
ALN-01
TOWN(S):
 
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD 
PLOTTED DATE:
c:\bms\2\lbususer\d0161588\HW_CP_0055-0145_ALN-01.dgn   FILE NAME: Deegan  LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
      
      
      
      
      
      
        
        
        
        
        
        
                                        
                                        
                                        
                                        
                                        
                                        
0055-0145
DESIGNER/DRAFTER: DG CHECKED BY: JAH
AND BENCH MARKS
BASELINE LAYOUT PLAN, BASELINE TIES 
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
 
 
 
0
1" = 40'
HORIZONTAL SCALE
40' 80'
CURVE #3
PC
PI
PT
T
L
R
STA 16+62.52
STA 18+08.23
STA 19+50.85
N 904023.55
E 977049.37
N 904167.86
E 977029.31
N 904310.12
E 977060.80
288.32'
810.00'
145.70'
20° 23'40.2"
PC
PI
T
L
R
STA 10+86.95
STA 11+80.80
N 903455.34
E 977006.08
N 903547.44
E 977024.23
187.72'
6000'
93.87'
01° 47' 33.2"
PI
PT
T
L
R
STA 14+57.78
STA 15+41.82
N 903819.18
E 977077.78
N 903904.00
E 977065.99
169.68'
510.00'
85.63'
19°03'43.8"
CURVE #1 CURVE #2
PT
PC
STA 9+93.09
N 903362.72
E 976990.82
STA 13+72.15
N 903735.17
E 977061.23
CURVE #1
CURVE #2
CURVE #3
E 976979.756
N 903295.541
STA. 9+25.00
MATCH EXISTING PAVEMENT MARKINGS
MEET EXISTING PAVEMENT
BEGIN MILL AND OVERLAY
CUT BITUMINOUS CONCRETE PAVEMENT
BEGIN PROJECT NO. 0055-0145
NO. 04525
BRIDGE PROPOSED 
N09°21'19.3"E
81.887ft
N11°08'52.5"E
191.343ft
N07°54'51.3"W
120.703ft 75.000ft N 75°43'36.5"E
P
C
 9+
93.09
N
 903362.723' E 976990.824' P T 11+ 80.80 N  903547.436' E 977024.231'
P
C
 13+
72.15
N
 903735.168'
E 977061.225'
PT 15+41.82 N  903903.995' E 977065.991'
PC
 16+62.52
N
 904023.548' E 977049.371'
END STA50+75.00
N 903972.464'
E 977131.727'
HOLCOMB HILL ROAD STA. 
= SIMSBURY ROAD STA 15+92.28
50+00.00
N 903953.973'
E 977059.043'
17+00
16+00
18+00
19+00
15+00
14+00
13+00
12+00
11+00
10+00
BEG
IN
 STA
9+
11.20
N
 903281.925' E 976977.512'
EN
D
 STA
19+
50.85
N
 904310.121'
E 977060.796'
E 977101.532
N 903964.782
STA. 50+44
MATCH EXISTING PAVEMENT MARKINGS
MEET EXISTING PAVEMENT
BEGIN MILL AND OVERLAY
CUT BITUMINOUS CONCRETE PAVEMENT
LIMIT OF CONSTRUCTION
03.05

Page 96

ELEVATION
FLOW
SECTION  A SECTION  B
A
ELEVATION
B
*
*
SEDIMENTATION CONTROL SYSTEM
SEDIMENTATION CONTROL SYSTEM
PROPOSED GRADE
EXISTING OR 
ON BACKSIDE OF THE BALE
DO NOT DISTURB GROUND
BINDING WIRE OR TWINE
HAY BALE1.5" x 1.5" x 36" MIN.
WOOD STAKE MIN DIMENSIONS
THE HAYBALE
EXCAVATED FILL ALONG
BACKFILL AND COMPACT 
DIRECTION OF FLOW
TO A DEPTH OF 4"
ENTRENCH HAY BALES 
1.5" x 1.5" x 42"
WOOD STAKE MIN DIMENSIONS
OVERLAP, SECURELY SEALED
AT SUPPORT POSTS WITH MIN. 6"
TO THE WOOD STAKE JOINTS ONLY
FASTEN GEOTEXTILE FABRIC FENCE
EXCAVATE TRENCH 6" MIN. X 6" MIN.
DIRECTION OF FLOW
SUITABLE SOIL
GEOTEXTILE FABRIC FENCE WITH
BACKFILL AND COMPACT OVER THE
WITH SUITABLE SOIL
AND BACKFILL COMPACT
6" MIN. X 6" MIN.
EXCAVATE TRENCH
DIRECTED BY THE ENGINEER
USE A 5' POST SPACING OR AS
FOR SLOPES STEEPER THAN 2:1
12" MIN.
6"
30" MIN.
GRADIENT IS 5% OR MORE
4' FROM THE TOE OF SLOPE AND THE FENCE LINE  
INSTALL THE WING WHEN THE FENCE IS MORE THAN
GRADE
EXISTING OR PROPOSED
THE GROUND
DO NOT TOUCH 
BINDINGS ON BALES 
PLACE HAY BALES SO 
PER HAY BALE
TWO WOODEN STAKES 
TO A DEPTH OF 4"
ENTRENCH BALES 18" MIN.
FLOW
FILL VOIDS WITH LOOSE HAY
ADD A WING AS DIRECTED
1.5" x 1.5" x 42"
MIN. DIMENSIONS
WOOD STAKE 
10' MAX.
GEOTEXTILE FABRIC FENCE
6" BELOW FINISHED GRADE
BURY BOTTOM OF GEOTEXTLE FENCE
GLASTONBURY, CT  06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
 DRAWING TITLE:
MDS-01
TOWN(S):
 
GRANBYOVER WEST BRANCH SALMON BROOK REHABILITATION OF BRIDGE NO. 04525 - SIMSBURY ROAD 
PLOTTED DATE:
c:\bms\2\lbususer\d0161588\HW_CP_0055-0145_MDS-01.dgn   FILE NAME: USJH683007  LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
      
      
      
      
      
      
        
        
        
        
        
        
                                        
                                        
                                        
                                        
                                        
                                        
0055-0145
DESIGNER/DRAFTER: DG CHECKED BY: JAH
SEDIMENTATION CONTROL SYSTEMS
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
 
NOT TO SCALE
03.06

Page 97

GLASTONBURY, CT  06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
 DRAWING TITLE:
MDS-02
TOWN(S):
 
GRANBYOVER WEST BRANCH SALMON BROOK REHABILITATION OF BRIDGE NO. 04525 - SIMSBURY ROAD 
PLOTTED DATE:
c:\bms\2\lbususer\d0161588\HW_CP_0055-0145_MDS-02.dgn   FILE NAME: USJH683007  LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
      
      
      
      
      
      
        
        
        
        
        
        
                                        
                                        
                                        
                                        
                                        
                                        
0055-0145
DESIGNER/DRAFTER: DG CHECKED BY: JAH
AND TYPE C RIPRAP APRON
CONCRETE WASHOUT AREA
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
 
NOT TO SCALE
VARIES
(SEE BELOW)
SIDE SLOPES
NOT TO SCALE
(SEE NOTE 2)
CONCRETE WASHOUT GENERAL NOTES:
SEE NOTE 2
SEE NOTE 2
DEPTH VARIES
EARTH BERM (SEE NOTE 3)
HAY BALES OR COMPACTED 
    OF THE WORK FOR THE PROJECT, INCLUDING SITE RESTORATION.
7. PAYMENT FOR THIS ITEM IS TO BE INCLUDED UNDER THE GENERAL COST 
    GUIDELINES.
    IN A MANNER CONSISTENT WITH ALL APPLICABLE LAWS, REGULATIONS, AND
    APPROVED BY THE ENGINEER.  ALL CONCRETE WASTE SHALL BE DISPOSED OF
    DEPTH.  THE WASTE CAN BE STORED AT AN UPLAND LOCATION, AS 
    WHEN THE WASTE HAS ACCUMULATED TO HALF OF THE CONCRETE WASHOUT'S 
6. HARDENED CONCRETE WASTE SHOULD BE REMOVED AND DISPOSED OF 
    CHECKED AFTER HEAVY RAINS.
    ENVIRONMENTAL INSPECTION REPORT)  WASHOUT AREA(S) SHOULD BE 
    LEAKS, TEARS, OR OVERFLOWS.  (AS REQUIRED BY THE CONSTRUCTION SITE 
    STRUCTURAL INTEGRITY, ADEQUATE HOLDING CAPACITY AND CHECKED FOR 
5. WASHOUT AREA(S) ARE TO BE INSPECTED AT LEAST ONCE A WEEK FOR 
    SAFETY FENCING OR OTHER APPROVED METHOD.
    TRUCKS AND PUMP RIGS.  WASHOUT AREA(S) SHOULD BE FLAGGED WITH 
    THE LOCATION OF THE CONCRETE WASHOUT TO OPERATORS OF CONCRETE
    CONCRETE AREA(S) AND ELSEWHERE AS NECESSARY TO CLEARLY INDICATE 
4. SIGNS SHOULD BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE 
    AROUND THE PERIMETER OF THE CONCRETE WASHOUT AREA FOR CONTAINMENT.
    CONTROL MEASURES, AS APPROVED BY THE ENGINEER, SHOULD BE USED 
3. SURFACE DISCHARGE IS UNACCEPTABLE.  THEREFORE, HAY BALES OR OTHER
    NOT LIMITED TO, OPERATIONS ASSOCIATED WITH GROUT AND MORTAR.
    AND CONCRETE WASTE GENERATED BY WASHOUT OPERATIONS INCLUDING, BUT
    SIZE: THE WASHOUT MUST HAVE SUFFICIENT VOLUME TO CONTAIN ALL LIQUID 
    THE WASHOUT IS TO BE LOCATED WITHIN THE FLOODPLAIN.
    THE FLOOD CONTINGENCY PLAN MUST ADDRESS THE CONCRETE WASHOUT IF 
    ANY STREAM, WETLAND, STORM DRAINS, OR OTHER SENSITIVE RESOURCE.  
    LOCATION: WASHOUT AREA(S) ARE TO BE LOCATED AT LEAST 50 FEET FROM 
    SEDIMENTATION CONTROL PLAN AND SHALL BE APPROVED BY THE ENGINEER. 
    THE CONCRETE WASHOUT AREA(S) WITH THE PROJECT'S EROSION AND 
2. THE CONTRACTOR SHALL SUBMIT THE DESIGN, LOCATION AND SIZING OF 
    SELF-CONTAINED.
    PLACEMENT ON SITE.  THE CONCRETE WASHOUT AREA SHALL BE ENTIRELY
1. CONCRETE WASHOUT AREA(S) SHALL BE INSTALLED PRIOR TO CONCRETE
(SEE NOTE 3)
COMPACTED EARTH BERM
HAY BALES OR 
AS DIRECTED BY ENGINEER)
SHEETING (OR METHOD
SAND BAGS TO SECURE
2H:1V OR 3H:1V (NOMINAL)
SIDE SLOPES TO BE
10 MIL POLYETHYLENE SHEETING
EXISTING GROUND
NOT TO SCALE
TYPE C OUTLET APRONS
ENDWALL
12'
0%
CONDITION WARRANT
SURVIVABILITY) SHOULD FIELD 
GEOTEXTILE (SEPARATION - MEDIUM 
 RIPRAP OR 12" FOR STANDARD RIPRAP
6" GRANULAR FILL FOR MODIFIED/ INTERMEDIATE
d
ENDWALL
SECTION A-A
ENDWALL
SECTION B-B
18"
18"
W 3
TWE
MAX.
2H : 1V
Rp MAX. 2H : 1V
1.5' 3' 1.5'
TYPE C RIPRAP APRON
18"
ENDWALL PLAN VIEW
12'
CHANNEL
DEFINED 
WELL 
3'
ENDWALL
B
B
W3
AA
PLAN
CONCRETE WASHOUT AREA
03.07

Page 98

GLASTONBURY, CT  06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
 DRAWING TITLE:
MDS-03
TOWN(S):
 
GRANBYOVER WEST BRANCH SALMON BROOK REHABILITATION OF BRIDGE NO. 04525 - SIMSBURY ROAD 
PLOTTED DATE:
c:\bms\2\lbususer\d0161588\HW_CP_0055-0145_MDS-03.dgn   FILE NAME: USJH683007  LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
      
      
      
      
      
      
        
        
        
        
        
        
                                        
                                        
                                        
                                        
                                        
                                        
0055-0145
DESIGNER/DRAFTER: DG CHECKED BY: JAH
BASINS - FIBER ROLL AND SILT SACK
EROSION CONTROL MEASURES AT CATCH 
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
 
NOT TO SCALE
CATCH BASIN
PLAN
AT TYPE "C" OR "C-L" CATCH BASIN
INLET SEDIMENT CONTROL DEVICE
SECTION
LIFT STRAPS
DUMPING STRAPS
SILT SACK
CATCH BASIN GRATE
9" FIBER ROLL
TYPE "C" OR "C-L" CATCH BASIN TOP
FIBER ROLL AROUND
CURB DEFLECTOR
SAND BAG
SAND BAG
     CONTROL SYSTEM AT CATCH BASIN
NOTE: THIS ITEM WILL BE MEASURED BY EACH SEDIMENT 
     CONTROL SYSTEM AT CATCH BASIN
NOTE: THIS ITEM WILL BE MEASURED BY EACH SEDIMENT 
03.08

Page 99

DBL YELLOW
BCLC
FL=315.28
FL=314.02
#780
CL&P
#781
CL&P
18'' CMP
CP-6
APPROX. STREET LINE
APPROX. STREET LINE
 ENDWALL
 ENDWALL
(FND)
IP
(FND)
MON
E.BIT
E.BIT
143 SIMSBURY RD
SOCIETY, INC
SALMON BROOK HISTORICAL
N/F
#779
CL&P
MAPLE
24"
MAPLE
24"
MAPLE
24"
MAPLE
15"
MAPLE
36"
CATALPA
36"
BARN
FRAME
STORY
1 1/2
D
R
IV
E
G
R
A
V
E
LE.BIT
295
300
305
310
+
+
3
15
315
320
320
325
330
BRIDGE #4525
ABUT #2 ABUT #1 PIER
PARAPET
PARAPET
DBL YELLOW
FL=290.99
FL=290.73
FL=294.70
FL=296.92
FL=306.41
FL=309.86
W
INGW
ALL
WINGWALL
WINGWALL
WINGWALL
#782
CL&P
#783
HELCO
#784
CL&P
         
 
 
 
 
 
  
 
 
N
 
9
0
4
0
0
0
E 977200
BT=305.98
FL=308.28
TF=311.88
BT=305.03
FL=307.13(S)
FL=307.33(NW)
TF=310.83
BT=305.29
FL=306.89(S)
FL=307.04(N)
TF=310.44
15
'' R
C
P
Y
E
LLO
W
D
B
L
15'' RCP
18'' RCP
CP-2
CP-5BOXES
SPLICE
ELEC
WIRE ROPE
WIRE ROPE WIRE ROPE
WIRE ROPE
 B.M. 2
MAG NAIL IN DRILL HOLE IN THE
SOUTHWEST CORNER OF
BRIDGE #04525 PARAPET
Elev. 295.345 
 NAVD 1988  
A
P
P
R
O
X
. S
T
R
E
E
T
 
LIN
E
A
P
P
R
O
X
. S
T
R
E
E
T
 
LIN
E
APPROX. STREET LINE
APPROX. STREET LINE
(FND)
MON
 ENDWALL
 ENDWALL
WIRE ROPE
WOOD POSTS
RCP
24''
24'' RCP
 
A
PP
R
O
X
. LO
C
. C
A
B
LE
 
T
V
 
D
U
C
T
 
A
P
P
R
O
X
. LO
C
. 3
" E
LE
C
. D
U
C
T
 
A
PP
R
O
X
. LO
C
. T
E
L D
U
C
T
(FND)
MON
#785
CL&P
155 SIMSBURY RD
GRANBY LAND TRUST, INC.
N/F
285
285
285
285
2
85
285
285
285
285
290
290 290
290 290
290
290
290
290
2
9
0
290
2
9
0
290
290
290
290
295
295
295
295
295
295
295
2
95
300
300
300
30
0
305
305
305
305
305
24'' RCP
3
10
310
310
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
50+00
17+00
18+00
19+00
E  976979.756
N 903295.541
STA. 9+25.00
MATCH EXISTING PAVEMENT MARKINGS
MEET EXISTING PAVEMENT
BEGIN MILL AND OVERLAY
CUT BITUMINOUS CONCRETE PAVEMENT
BEGIN PROJECT NO. 0055-0145
8
3
COORDINATE GRID
A
D
           
CONNECTICUT
               
UNIT TYPE II
R-B END ANCHORAGE 
R-B END ANCHORAGE UNIT TYPE II
THRIE-BEAM ATTACHMENT
THRIE-BEAM ATTACHMENT
100' METAL BEAM RAIL (R-B MASH)
83' METAL BEAM RAIL (R-B MASH)
R=160'
INV 308.00 15" OUT 
TOP EL 311.10
STA 16+36.05, 15.0' RT
0' - 10' DEEP
TYPE "C" CB
PORTION OF EXIST. PIPE
REMOVE  EXIST. CB AND 
15'
BCLC
BRIDGE NO. 04525PROPOSED 
BROOK
REFERENCE ONLY)
(LAYOUT SHOWN IS FOR
RELOCATION (BY OTHERS)
PERMANENT OVERHEAD UTILITY 
THRIE-BEAM ATTACHMENT
R-B END ANCHORAGE UNIT TYPE II
R-B END ANCHORAGE UNIT TYPE II
BCLC
AND STOP SIGN (SEE NOTE 6)
RELOCATE STOP BAR
SIMSBURY ROAD
H
O
LC
O
M
B
 H
ILL R
O
A
D
BR
AN
C
H
BE RELOCATED (BY OTHERS)
EXISTING UTILITY POLE TO 
BE RELOCATED (BY OTHERS)
EXISTING UTILITY POLE TO 
INV 315.30 18" OUT 
TOP EL 317.80
STA 18+15.50, 20.00' RT
'L' ENDWALL
ROAD B
SIMSBURY 
L
REST CATCH BASIN 
M
A
TC
H
 LIN
E 17+
00
M
A
TC
H
 LIN
E 17+
00
STA. 9+75
MATCH EXISTING PAVEMENT WIDTH
BEGIN FULL DEPTH RECONSTRUCTION
CUT BITUMINOUS CONCRETE
END MILL AND OVERLAY
15'
15'
STA. 19+00
BEGIN MILL AND OVERLAY
MATCH EXISTING PAVEMENT WIDTH
CUT BITUMINOUS CONCRETE
END FULL DEPTH RECONSTRUCTION
15'
+00
15'
15'
SWALE
REGRADE EXISTING
BITUMINOUS CONCRETE DRIVEWAY
CENTER LINE
4" DOUBLE YELLOW 4" WHITE EDGE  LINE
8
3
COORDINATE GRID
A
D
           
CONNECTICUT
               
24.15'±
GRAVEL DRIVEWAY (SEE NOTE 5)
REGRADE PARKING AREA
44'
SIMSBURY ROAD
0
1" = 30'
HORIZONTAL SCALE
30' 60'
R-B END ANCHORAGE UNIT TYPE II
20' ACCESS WIDTH TO FIELD
GRAVEL DRIVEWAY
22.0'
GLASTONBURY, CT  06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
 DRAWING TITLE:
HWY-01
TOWN(S):
 
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD 
PLOTTED DATE:
c:\bms\2\lbususer\d0161588\HW_CP_0055-0145_HWY-01.dgn   FILE NAME: USJH683007  LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
      
      
      
      
      
      
        
        
        
        
        
        
                                        
                                        
                                        
                                        
                                        
                                        
0055-0145
DESIGNER/DRAFTER: DG CHECKED BY: JAH
HIGHWAY PLAN
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
 
+00
+27.8
+39.4
24.41'
10'
10'
22.0'±
W
EST
REMOVE EXISTING "L" ENDWALL
 GUIDERAIL
REMOVE TWO-CABLE
THRIE-BEAM ATTACHMENT
 GUIDERAIL
REMOVE TWO-CABLE
0'-10' DEEP
45 LF - 18" R.C. PIPE 
143 SIMSBURY RD
SOCIETY, INC
SALMON BROOK HISTORICAL
N/F
143 SIMSBURY RD
SOCIETY, INC
SALMON BROOK HISTORICAL
N/F
0'-10' DEEP
7 LF 15" RCP
290.00
40 HOLCOMB RIDGE
GRANBY LAND TRUST
N/F
40 HOLCOMB RIDGE
GRANBY LAND TRUST
N/F
B C D
B D
A B C
A
185'±
3
7
'
122'±
+78.5
F
CUT BITUMINOUS CONCRETE PAVEMENT
END MILL AND OVERLAY - MEET EXITING PAVEMENT
MATCH EXISTING PAVEMENT MARKINGS
STA. 19+50
N 904309.296
E 977060.614
END PROJECT NO. 0055-0145
E
SALMON R  =  160' 182.14^
R-B END ANCHORAGE UNIT TYPE II
RIGHT TO REMOVE TREES REQUIREDH
HIGHWAY REQUIRED
EASEMENT TO SLOPE FOR SUPPORT OF G
HIGHWAY REQUIRED
EASEMENT TO SLOPE FOR THE SAFETY OF THE F
GUIDERAIL EASEMENTE
SYSTEM REQUIRED
RIGHT TO INSTALL SEDIMENTATION CONTROL D
DRIVEWAY AND/OR PARKING AREA REQUIRED
RIGHT TO CONSTRUCT (OR RECONSTRUCT) C
RIGHT TO GRADE REQUIREDB
PARTIAL ACQUISITION REQUIREDA
SCHEDULE OF RIGHTS AND EASEMENTS
G
H
REMOVE TWO-CABLE GUIDERAIL
 GUIDERAIL
REMOVE TWO-CABLE
REFERENCE ONLY)
(LAYOUT SHOWN IS FOR
RELOCATION (BY OTHERS)
PERMANENT OVERHEAD UTILITY 
TAKING LINE
TAKING LINE
H
A
(SEE NOTE 9)
SLOPE PROTECTION
CRUSHED STONE FOR
 PROTECTION (SEE NOTE 9)
CRUSHED STONE FOR SLOPE SEE NOTE 2
SEE DRAWING NO. MDS-02 FOR RIPRAP APRON DETAIL.9.
FOR CRUSHED STONE FOR SLOPE PROTECTION, SEE DRAWING TYP-01.8.
CATCH BASIN CURB. PAID FOR UNDER BITUMINOUS LIP CURBING.
TRANSITION BITUMINOUS CONCRETE LIP CURB (BCLC) SHAPE AND HEIGHT TO MATCH EXISTING 7.
SEE DRAWING NO. GEN-01 FOR SIGNING AND PAVEMENT MARKING NOTES.6.
REMOVE EXISTING MATERIAL AND INSTALL GRAVEL DRIVEWAY MATERIAL TO EXISTING LIMITS.5.
FIELD REVIEW THE MARKINGS AND MAKE ANY ADJUSTMENTS PRIOR TO CLEARING AND GRUBBING.
CLEARING AND GRUBBING. THE CONTRACTOR SHALL PROVIDE THE TOWN OF GRANBY TWO WEEKS TO 
THE CONTRACTOR SHALL MARK ALL TREES, SHRUBS AND PLANTS TO BE REMOVED IN ADVANCE OF 4.
FOR CURVE DATA, SEE DRAWING NO. ALN-013.
FOR STREAM CHANNEL AND EMBANKMENT RESTORATION SEE SUBSET 04-STRUCTURES.2.
FOR NOTES AND LEGEND, SEE DRAWING NO. GEN-011.
NOTES:
SEE NOTE 4
90^
25.5'±
3
2
'
+05.3
90^
 GUIDERAIL
REMOVE TWO-CABLE
TAKING LINE
54' *RT16+4716+08.8±
36' *RT15+85±15+58.5
LENGTHSIDETOFROM
BITUMINOUS CONCRETE LIP CURB (BCLC)
R = 160'
O
H
W
O
HW
OHW
12'-6" METAL BEAM RAIL (R-B MASH)
12'-6" METAL BEAM RAIL (R-B MASH)
ACCESS WIDTH TO FIELD
 20' GRAVEL DRIVEWAY
12'-6" METAL BEAM RAIL (R-B MASH)
CLEAN EXISTING CATCH BASIN
INV 314.00
TOP EL 317.50
STA 17+88.80, 20.00' LT
STRAIGHT ENDWALL
- 12" TO 42" DIAMETER
CLEAN EXISTING CULVERT 
- 12" TO 42" DIAMETER
CLEAN EXISTING CULVERT 
CLEAN EXISTING CATCH BASIN
- 12" TO 42" DIAMETER
CLEAN EXISTING CULVERT 
SEE NOTE 8
* SEE NOTE 8
0'-10' DEEP
4 LF 15" RCP
INV 307.83 15" OUT 
INV 307.90 15" IN
TOP EL 310.20
STA 16+30.79, 21.26' RT
TYPE "CL" CB
0' - 10' DEEP
W/PAVED APRON
TYPE "C-L" CB
ENDWALL
REMOVE EXISTING
SEE NOTE 8
HOLCOMB HILL RD. 44' RT
LIMIT OF OVERLAY
(SEE NOTE 9)
MODIFIED RIPRAP
03.09

Page 100

9+00
9+00
10+00
10+00
10+00
10+00
11+00
11+00
12+00
12+00
13+00
13+00
14+00
14+00
15+00
15+00
16+00
16+00
17+00
17+00
18+00
18+00
19+00
19+00
20+00
20+00
270 270 
280 280 
290 290 
300 300 
310 310 
320 320 
330 330 
340 340 
1499.774'SSD = 
198.031'K = 
150.000'L = 
307.919'SSD = 
64.140'K = 
320.000'L = 
230.359'SSD = 
34.415'K = 
123.000'L = 
312.74'EL. 
16+68.00PVT STA. 
306.19'EL. 
15+18.00PVC STA. 
297.84'EL. 
13+42.00PVT STA. 
323.65'EL. 
18+86.50PVT STA. 
290.64'EL. 
10+22.00PVC STA. 
316.55'EL. 
17+63.50PVC STA. 
290.62'EL. 
10+37.69L.P. STA. 
-0.24%S=
+4.74% S=
+3.99% S=
+7.56%
S=
290.88'EL. 
9+25.00PVI STA. 
309.75'EL. 
15+93.00PVI STA. 
290.25'EL. 
11+82.00PVI STA. 
319.00'EL. 
18+25.00PVI STA. 
325.19'EL. 
19+06.88PVI STA. 
 
 
0
HORIZONTAL SCALE IN FEET
40 80
 0
VERTICAL SCALE IN FEET
4 8
290.71
290.70
290.73
290.92
292.85
292.68
296.06
295.99
297.46
300.59
305.27
305.34
310.44
309.91
314.02
314.02
318.27
318.20
324.68
324.67
290.56
290.63
291.46
291.61
294.38
294.14
286.66
298.22
301.26
302.97
308.13
307.68
312.22
312.01
315.93
316.01
320.84
321.08
290.84
290.82
STA. 9+25
BEGIN MILL AND OVERLAY
BEGIN STATE PROJECT NO. 0055-0145
STA. 9+75
BEGIN FULL DEPTH RECONSTRUCTION
END MILL AND OVERLAY
STA. 12+54.57
BRIDGE BEGINS
STA. 13+64.70
BRIDGE ENDS
STA. 19+00
BEGIN MILL AND OVERLAY
END FULL DEPTH RECONSTRUCTION
STA. 19+50
END MILL AND OVERLAY
END STATE PROJECT NO. 0055-0145
GLASTONBURY, CT  06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
  DRAWING TITLE:
PRO-01
TOWN(S):
 
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD 
PLOTTED DATE:
c:\bms\2\lbususer\d0186709\HW_CB_0055-0145_GEO.dgn   FILE NAME: USJH683007  LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
      
      
      
      
      
      
        
        
        
        
        
        
                                        
                                        
                                        
                                        
                                        
                                        
0055-0145
DESIGNER/DRAFTER: DG CHECKED BY: JAH
PROFILE
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
 
(CALCULATED) EL. 290.5
100-YEAR FLOOD ELEVATION 
PROPOSED GRADE
EXISTING GRADE 0'-10' DEEP
18" R.C. PIPE
S=0.24±%
S=8.27±%
0'-10' DEEP
15" R.C. PIPE
0'-10' DEEP
TYPE "C-L"
HOLCOMB HILL ROAD INTERSECTION
0'-10' DEEP
TYPE "C"
0'-10' DEEP
15" R.C. PIPE
EL. 288.37
LOW CHORD 
BRIDGE 04525
18" RCP 15" RCP RCP
15" 
03.10

Page 101

DBL YELLOW
BCLC
FL=315.28
FL=314.02
#780
CL&P
#781
CL&P
18'' CMP
CP-6
APPROX. STREET LINE
APPROX. STREET LINE
 ENDWALL
 ENDWALL
(FND)
IP
(FND)
MON
DITCH
EARTH
E.BIT
E.BIT
143 SIMSBURY RD
SOCIETY, INC
SALMON BROOK HISTORICAL
N/F
#779
CL&P
MAPLE
24"
MAPLE
24"
MAPLE
24"
MAPLE
15"
MAPLE
36"
CATALPA
36"
BARN
FRAME
STORY
1 1/2
D
R
IV
E
G
R
A
V
E
LE.BIT
295
300
305
310
+
+
3
15
315
320
320
325
330
OHW-1
OHW-2
OHW-3
OHW-4
OHW-5
OHW-6
CT3-1
CT3-2
CT3-3
OHW-6A
OHW-7A
OHW-8A
OHW-5A
OHW-4A
OHW-3A
OHW-2A
OHW-1A
CT1-10
CT1-9
CT1-8
CT1-7
CT1-6
CT1-5
CT1-4
CT1-3
CT1-2
CT1-1
W1-1
W1-2
W1-3
W1-4
W1-5
IWC1-1
IWC1-2
IWC1-3
IWC1-4
IWC1-5
IWC1-6
IWC1-7
BRIDGE #4525
ABUT #2 ABUT #1 PIER
PARAPET
PARAPET
DBL YELLOW
FL=290.99
FL=290.73
FL=294.70
FL=296.92
FL=306.41
FL=309.86
W
INGW
ALL
WINGWALL
WINGWALL
WINGWALL
#782
CL&P
#783
HELCO
#784
CL&P
         
 
 
 
 
 
  
 
 
N
 
9
0
4
0
0
0
E 977200
BT=305.98
FL=308.28
TF=311.88
BT=305.03
FL=307.13(S)
FL=307.33(NW)
TF=310.83
BT=305.29
FL=306.89(S)
FL=307.04(N)
TF=310.44
15
'' R
C
P
Y
E
LLO
W
D
B
L
15'' RCP
18'' RCP
CP-2
CP-5BOXES
SPLICE
ELEC
WIRE ROPE
WIRE ROPE WIRE ROPE
WIRE ROPE
 B.M. 2
MAG NAIL IN DRILL HOLE IN THE
SOUTHWEST CORNER OF
BRIDGE #04525 PARAPET
Elev. 295.345 
 NAVD 1988  
A
P
P
R
O
X
. S
T
R
E
E
T
 
LIN
E
A
P
P
R
O
X
. S
T
R
E
E
T
 
LIN
E
APPROX. STREET LINE
APPROX. STREET LINE
(FND)
MON
 ENDWALL
 ENDWALL
WIRE ROPE
WOOD POSTS
RCP
24''
24'' RCP
 
A
PP
R
O
X
. LO
C
. C
A
B
LE
 
T
V
 
D
U
C
T
 
A
P
P
R
O
X
. LO
C
. 3
" E
LE
C
. D
U
C
T
 
A
PP
R
O
X
. LO
C
. T
E
L D
U
C
T
(FND)
MON
#785
CL&P
155 SIMSBURY RD
GRANBY LAND TRUST, INC.
N/F
OHW-1
OHW-2
OHW-3
OHW-4
OHW-5
OHW-6
CT3-1
CT3-2
CT3-3
OHW-6A
OHW-7A
OHW-8A
OHW-5A
OHW-4A
OHW-3A
OHW-2A
CT1-10
CT1-9
CT1-8
CT1-7
CT1-6
CT1-5
CT1-4
CT1-3
CT1-2
CT1-1
W1-1
W1-2
W1-3
W1-4
W1-5
IWC1-1
IWC1-2
IWC1-3
IWC1-4
IWC1-5
IWC1-6
IWC1-7
285
285
285
285
2
85
285
285
285
285
290
290 290
290 290
290
290
290
290
2
9
0
290
2
9
0
290
290
290
290
295
295
295
295
295
295
295
2
95
300
300
300
30
0
305
305
305
305
305
24'' RCP
3
10
310
310
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
50+00
17+00
18+00
19+00
E  976979.756
N 903295.541
STA. 9+25.00
MATCH EXISTING PAVEMENT MARKINGS
MEET EXISTING PAVEMENT
BEGIN MILL AND OVERLAY
CUT BITUMINOUS CONCRETE PAVEMENT
BEGIN PROJECT NO. 0055-0145
8
3
COORDINATE GRID
A
D
           
CONNECTICUT
               
SLOPE LIMIT (TYP)
APPROXIMATE 
(SEE STRUCTURE PLANS)
BRIDGE NO. 04525
BROOK
SIMSBURY ROAD
H
O
LC
O
M
B
 H
ILL R
O
A
D
BR
AN
C
H
M
A
TC
H
 LIN
E 17+
00
M
A
TC
H
 LIN
E 17+
00
STA. 9+75
MATCH EXISTING PAVEMENT WIDTH
BEGIN FULL DEPTH RECONSTRUCTION
CUT BITUMINOUS CONCRETE
END MILL AND OVERLAY
STA. 19+00
BEGIN MILL AND OVERLAY
MATCH EXISTING PAVEMENT WIDTH
CUT BITUMINOUS CONCRETE
END FULL DEPTH RECONSTRUCTION
15'
+00
15'
8
3
COORDINATE GRID
A
D
           
CONNECTICUT
               
24.15'
SIMSBURY ROAD
0
1" = 30'
HORIZONTAL SCALE
30' 60'
22.0'
GLASTONBURY, CT  06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
 DRAWING TITLE:
GLP-01
TOWN(S):
 
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD 
PLOTTED DATE:
c:\bms\2\lbususer\d0161588\HW_CP_0055-0145_GLP-01.dgn   FILE NAME: Deegan  LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
      
      
      
      
      
      
        
        
        
        
        
        
                                        
                                        
                                        
                                        
                                        
                                        
0055-0145
DESIGNER/DRAFTER:DG CHECKED BY:JAH
LANDSCAPING PLAN
GRADING AND 
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
 
324.00
320.00
315.00
310.00
305.00
300.00 295.00
291.00
+39.4
24.41'
10'
22.0'
W
EST
143 SIMSBURY RD
SOCIETY, INC
SALMON BROOK HISTORICAL
N/F
143 SIMSBURY RD
SOCIETY, INC
SALMON BROOK HISTORICAL
N/F
290.00
290.00
40 HOLCOMB RIDGE
GRANBY LAND TRUST
N/F 40 HOLCOMB RIDGE
GRANBY LAND TRUST
N/F
CUT BITUMINOUS CONCRETE PAVEMENT
END MILL AND OVERLAY - MEET EXITING PAVEMENT
MATCH EXISTING PAVEMENT MARKINGS
STA. 19+50
N 904309.296
E 977060.614
END PROJECT NO. 0055-0145
SALMON
TAKING LINE
SLOPE LIMIT (TYP)
APPROXIMATE 
SWALE SHALL BE COMPRISED OF 4" TOPSOIL WITH EROSION CONTROL MATTING TYPE G.2.
FOR NOTES AND LEGEND, SEE DRAWING NO. GEN-011.
NOTES:
TAKING LINE
SIMSBURY ROAD BL
SLOPE LIMIT (TYP)
APPROXIMATE 
290.00 285.00
300.00
TAKING LINE
(SEE NOTE 2)
VEGETATED DITCH 
(SEE NOTE 2)
VEGETATED DITCH 
03.11

Page 102

STA.9+25.00
 -50
 -50
 -40
 -40
 -30
 -30
 -20
 -20
 -10
 -10
 0
 0
 10
 10
 20
 20
 30
 30
 40
 40
 50
 50
 270  270
 280  280
 290  290
 300  300
MATCH EXIST.MATCH EXIST.
STA.9+50.00
 -50
 -50
 -40
 -40
 -30
 -30
 -20
 -20
 -10
 -10
 0
 0
 10
 10
 20
 20
 30
 30
 40
 40
 50
 50
 270  270
 280  280
 290  290
 300  300
12:1-2.0% -2.0% -2.0% -2.0% 12:1
4:1
STA.10+00.00
 -50
 -50
 -40
 -40
 -30
 -30
 -20
 -20
 -10
 -10
 0
 0
 10
 10
 20
 20
 30
 30
 40
 40
 50
 50
 270  270
 280  280
 290  290
 300  300
EL = 290.70 EL = 290.70 
 SHDR
 SHDR
 EOR 
 EOR 
6:1
18:1 -3.0% -2.0% -2.0% -3.0% 12:1
6:1
STA.10+50.00
 -50
 -50
 -40
 -40
 -30
 -30
 -20
 -20
 -10
 -10
 0
 0
 10
 10
 20
 20
 30
 30
 40
 40
 50
 50
 270  270
 280  280
 290  290
 300  300
EL = 290.63 EL = 290.63 
 SHDR
 SHDR
 EOR 
 EOR 
1:20 -4.0% -2.0% -2.0% -4.0% 12:1
STA.11+00.00
 -50
 -50
 -40
 -40
 -30
 -30
 -20
 -20
 -10
 -10
 0
 0
 10
 10
 20
 20
 30
 30
 40
 40
 50
 50
 270  270
 280  280
 290  290
 300  300
EL = 290.93 
 SHDR
 SHDR
 EOR 
 EOR 
20:1 -4.0% -2.0% -2.0% -4.0% 12:1
STA.11+50.00
 -50
 -50
 -40
 -40
 -30
 -30
 -20
 -20
 -10
 -10
 0
 0
 10
 10
 20
 20
 30
 30
 40
 40
 50
 50
 270  270
 280  280
 290  290
 300  300
EL = 291.61 EL = 291.61 
 SHDR
 SHDR
 EOR 
 EOR 
0
1" = 10'
HORIZONTAL SCALE
10' 20'
GLASTONBURY, CT  06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
 DRAWING TITLE:
XSC-01
TOWN(S):
 
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD 
PLOTTED DATE:
c:\bms\2\lbususer\d0153873\0055-0145 - Corridor.dgn   FILE NAME: USJH683007  LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
      
      
      
      
      
      
        
        
        
        
        
        
                                        
                                        
                                        
                                        
                                        
                                        
0055-0145
DESIGNER/DRAFTER:DG CHECKED BY:JAH
CROSS SECTIONS
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
 
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
GRAVEL DRIVEWAY
GRAVEL DRIVEWAY
PARKING AREA
PARKING AREA
03.12

Page 103

12:1 -4.0% -2.0% -2.0% -4.0% 12:1 2:1
STA.12+00.00
 -50
 -50
 -40
 -40
 -30
 -30
 -20
 -20
 -10
 -10
 0
 0
 10
 10
 20
 20
 30
 30
 40
 40
 50
 50
 280  280
 290  290
 300  300
EL = 292.68 EL = 292.68 
 SHDR
 SHDR
 EOR 
 EOR 
2:1
12:1 -4.0% -2.0% -1.9% -4.0%
STA.12+50.00
 -50
 -50
 -40
 -40
 -30
 -30
 -20
 -20
 -10
 -10
 0
 0
 10
 10
 20
 20
 30
 30
 40
 40
 50
 50
 280  280
 290  290
 300  300
EL = 294.14 EL = 294.14 
 SHDR
 SHDR
 EOR 
 EOR 
-4.0% -2.0% 0.5% -4.0%
STA.13+00.00
 -50
 -50
 -40
 -40
 -30
 -30
 -20
 -20
 -10
 -10
 0
 0
 10
 10
 20
 20
 30
 30
 40
 40
 50
 50
 280  280
 290  290
 300  300
 310  310
EL = 295.99 EL = 295.99 
 SHDR
 SHDR
 EOR 
 EOR 
-4.0% -3.0% 2.9% -4.0%
STA.13+50.00
 -50
 -50
 -40
 -40
 -30
 -30
 -20
 -20
 -10
 -10
 0
 0
 10
 10
 20
 20
 30
 30
 40
 40
 50
 50
 280  280
 290  290
 300  300
 310  310
EL = 298.22 EL = 298.22 
 SHDR
 SHDR
 EOR 
 EOR 
-5.4% -5.4% 5.4% -1.6% 12:1
STA.14+00.00
 -50
 -50
 -40
 -40
 -30
 -30
 -20
 -20
 -10
 -10
 0
 0
 10
 10
 20
 20
 30
 30
 40
 40
 50
 50
 280  280
 290  290
 300  300
 310  310
EL = 300.59 EL = 300.59 
 SHDR
 SHDR
 EOR 
 EOR 
-6.0% -6.0% 6.0% -1.0% 12:1
STA.14+50.00
 -50
 -50
 -40
 -40
 -30
 -30
 -20
 -20
 -10
 -10
 0
 0
 10
 10
 20
 20
 30
 30
 40
 40
 50
 50
 290  290
 300  300
 310  310
EL = 302.97 EL = 302.97 
 SHDR
 SHDR
 EOR 
 EOR 
-6.0% -6.0% 6.0% -1.0% 12:1
STA.14+25.00
 -50
 -50
 -40
 -40
 -30
 -30
 -20
 -20
 -10
 -10
 0
 0
 10
 10
 20
 20
 30
 30
 40
 40
 50
 50
 280  280
 290  290
 300  300
 310  310
EL = 301.78 EL = 301.78 
 SHDR
 SHDR
 EOR 
 EOR 
0
1" = 10'
HORIZONTAL SCALE
10' 20'
GLASTONBURY, CT  06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
 DRAWING TITLE:
XSC-02
TOWN(S):
 
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD 
PLOTTED DATE:
c:\bms\2\lbususer\d0153873\0055-0145 - Corridor.dgn   FILE NAME: USJH683007  LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
      
      
      
      
      
      
        
        
        
        
        
        
                                        
                                        
                                        
                                        
                                        
                                        
0055-0145
DESIGNER/DRAFTER:DG CHECKED BY:JAH
CROSS SECTIONS
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
 
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
BRIDGE RAIL (TYP.)
3 TUBE CURB MOUNTED
BRIDEGE 04525
BRIDGE RAIL (TYP.)
3 TUBE CURB MOUNTED
BRIDEGE 04525
ATTACHMENT
THRIE BEAM BRIDGE
BRIDGE RAIL
3 TUBE CURB MOUNTED 
BRIDGE RAIL
3 TUBE CURB MOUNTED 
BRIDGE RAIL
3 TUBE CURB MOUNTED 
NW WINGWALL 2A
NW WINGWALL 2A
NW WINGWALL 2A
GRAVEL DRIVEWWAY
SLOPE PROTECTION
CRUSHED STONE FOR
03.13

Page 104

12:1
-6.0% -6.0% 6.0% -1.0% 12:1
STA.15+00.00
 -50
 -50
 -40
 -40
 -30
 -30
 -20
 -20
 -10
 -10
 0
 0
 10
 10
 20
 20
 30
 30
 40
 40
 50
 50
 290  290
 300  300
 310  310
 320  320
EL = 305.34 EL = 305.34 
 SHDR
 SHDR
 EOR 
 EOR 
7:1
12:1 -4.0% -3.1% 3.2% -3.5% 12:1 3:1
STA.15+50.00
 -50
 -50
 -40
 -40
 -30
 -30
 -20
 -20
 -10
 -10
 0
 0
 10
 10
 20
 20
 30
 30
 40
 40
 50
 50
 290  290
 300  300
 310  310
 320  320
EL = 307.68 EL = 307.68 
 SHDR
 SHDR
 EOR 
 EOR 
12:1
-4.0% -0.3% 0.3%
STA.16+00.00
 -50
 -50
 -40
 -40
 -30
 -30
 -20
 -20
 -10
 -10
 0
 0
 10
 10
 20
 20
 30
 30
 40
 40
 50
 50
 290  290
 300  300
 310  310
 320  320
EL = 309.91 EL = 309.91 
 SHDR
 EOR 
HOLCOMB HILL ROAD
SECTION ON DRAWING NO. XSC-04
SEE HOLCOMB HILL ROAD CROSS 
12:1
-4.0% 2.5% -2.5% -4.0% 6:1 4:1
STA.16+50.00
 -50
 -50
 -40
 -40
 -30
 -30
 -20
 -20
 -10
 -10
 0
 0
 10
 10
 20
 20
 30
 30
 40
 40
 50
 50
 300  300
 310  310
 320  320
EL = 312.01 EL = 312.01 
 SHDR
 SHDR
 EOR 
 EOR 
INV = 308.00 OUT
TF = 311.10
15.0' RT
STA. 16+36.05
0'-10' DEEP
TYPE "C" CB 
0'-10' DEEP
7 LF 15" R.C. PIPE 
TYPE "C" CB 
REMOVE
OF EXIST. PIPE
REMOVE PORTION
INV = 307.83 OUT
INV = 307.90 IN
TF = 310.20
21.26' RT
STA. 16+30.79
0'-10' DEEP
TYPE "CL" CB 
0'-10' DEEP
4 LF 15" R.C. PIPE 
6:1
12:1 -1.6% 5.4% -5.4% -5.4% 6:1 6:1
STA.17+00.00
 -50
 -50
 -40
 -40
 -30
 -30
 -20
 -20
 -10
 -10
 0
 0
 10
 10
 20
 20
 30
 30
 40
 40
 50
 50
 300  300
 310  310
 320  320
EL = 314.02 EL = 314.02 
 SHDR
 SHDR
 EOR 
 EOR 
3:1
12:1 -1.6% 5.4% -5.4% -5.4% 6:1 6:1
STA.17+50.00
 -50
 -50
 -40
 -40
 -30
 -30
 -20
 -20
 -10
 -10
 0
 0
 10
 10
 20
 20
 30
 30
 40
 40
 50
 50
 300  300
 310  310
 320  320
 330  330
EL = 316.01 EL = 316.01 
 SHDR
 SHDR
 EOR 
 EOR 
0
1" = 10'
HORIZONTAL SCALE
10' 20'
GLASTONBURY, CT  06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
 DRAWING TITLE:
XSC-03
TOWN(S):
 
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD 
PLOTTED DATE:
c:\bms\2\lbususer\d0153873\0055-0145 - Corridor.dgn   FILE NAME: USJH683007  LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
      
      
      
      
      
      
        
        
        
        
        
        
                                        
                                        
                                        
                                        
                                        
                                        
0055-0145
DESIGNER/DRAFTER: DG CHECKED BY:JAH
CROSS SECTIONS
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
 
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
15" R.C. PIPE
03.14

Page 105

3:1
12:1 0.0% 5.4% -5.4% -5.4% 12:1
STA.18+00.00
 -50
 -50
 -40
 -40
 -30
 -30
 -20
 -20
 -10
 -10
 0
 0
 10
 10
 20
 20
 30
 30
 40
 40
 50
 50
 300  300
 310  310
 320  320
 330  330
EL = 318.20 EL = 318.20 
 SHDR
 SHDR
 EOR 
 EOR 
5:1
12:12.0% 5.4%
-5.4% 12:1 3:1
STA.18+50.00
 -50
 -50
 -40
 -40
 -30
 -30
 -20
 -20
 -10
 -10
 0
 0
 10
 10
 20
 20
 30
 30
 40
 40
 50
 50
 300  300
 310  310
 320  320
 330  330
EL = 321.08 
 SHDR
 SHDR
 EOR 
 EOR 
3:1
2.4% -5.4% 12:1 6:1
STA.19+00.00
 -50
 -50
 -40
 -40
 -30
 -30
 -20
 -20
 -10
 -10
 0
 0
 10
 10
 20
 20
 30
 30
 40
 40
 50
 50
 310  310
 320  320
 330  330
 340  340
EL = 324.67 EL = 324.67 
 SHDR
 SHDR
 EOR 
 EOR 
2.4%
STA.19+50.00
 -50
 -50
 -40
 -40
 -30
 -30
 -20
 -20
 -10
 -10
 0
 0
 10
 10
 20
 20
 30
 30
 40
 40
 50
 50
 310  310
 320  320
 330  330
 340  340
MATCH EXIST.
STA.50+44.00
 -50
 -50
 -40
 -40
 -30
 -30
 -20
 -20
 -10
 -10
 0
 0
 10
 10
 20
 20
 30
 30
 40
 40
 50
 50
 300  300
 310  310
MATCH EXIST. MATCH EXIST.
TYPE "C" CB TYPE "C" CB
18" R.C. PIPE15" R.C. PIPE
15" R.C. PIPE
0
1" = 10'
HORIZONTAL SCALE
10' 20'
GLASTONBURY, CT  06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
 DRAWING TITLE:
XSC-04
TOWN(S):
 
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD 
PLOTTED DATE:
c:\bms\2\lbususer\d0153873\0055-0145 - Corridor.dgn   FILE NAME: USJH683007  LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
      
      
      
      
      
      
        
        
        
        
        
        
                                        
                                        
                                        
                                        
                                        
                                        
0055-0145
DESIGNER/DRAFTER:DG CHECKED BY:JAH
CROSS SECTIONS
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
 
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE EX. HIGHWAY LINE
 EX. HIGHWAY LINE EX. HIGHWAY LINE EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
 EX. HIGHWAY LINE
HOLCOMB HILL ROAD
STA 18+15.50, 20' RT
L ENDWALL
INV = 315.30
- 0' -10' DEEP
18" R.C. PIPE 
STA 17+88.80, 20' LT
STRAIGHT ENDWALL
TYPE C RIPRAP APRON
03.15

Page 106

APPENDIX
C DRAINAGE
AREA PLANS

Page 107

PARAPET
PARAPET
FL=290.99
FL=290.73
FL=294.70
FL=296.92
FL=306.41
FL=309.86
FL=315.28
FL=314.02
W
INGW
ALL
WINGWALL
WINGWALL
WINGWALL
#780
CL&P
#781
CL&P
#782
CL&P
#783
HELCO
#784
CL&P
BT=305.98
FL=308.28
TF=311.88
BT=305.03
FL=307.13(S)
FL=307.33(NW)
TF=310.83
BT=305.29
FL=306.89(S)
FL=307.04(N)
TF=310.44
15
'' R
C
P
15'' RCP
18'' RCP
18'' CMP
BOXES
SPLICE
ELEC
A
P
P
R
O
X
. S
T
R
E
E
T
 
LIN
E
A
P
P
R
O
X
. S
T
R
E
E
T
 
LIN
E
APPROX. STREET LINE
APPROX. STREET LINE
APPROX. STREET LINE
APPROX. STREET LINE
142 SIMSBURY RD
KATHERINE C. DUNNINGTON
N/F
143 SIMSBURY RD
STEPHEN W HASTINGS
N/F
40 HOLCOMB RIDGE
GRANBY LAND TRUST
N/F
 ENDWALL
 ENDWALL
 ENDWALL
 ENDWALL
RCP
24''
24'' RCP
24'' RCP
OHW-1
OHW-2
OHW-3
OHW-4
OHW-5
OHW-6
CT3-1
CT3-2
CT3-3
OHW-6A
OHW-7A
OHW-8A
OHW-5A
OHW-4A
OHW-3A
OHW-2A
OHW-1A
CT1-10
CT1-9
CT1-8
CT1-7
CT1-6
CT1-5
CT1-4
CT1-3
CT1-2
CT1-1
W1-1
W1-2
W1-3
W1-4
W1-5
IWC1-1
IWC1-2
IWC1-3
IWC1-4
IWC1-5
IWC1-6
IWC1-7
H
O
LC
O
M
B
 H
ILL R
O
A
D
SIMSBURY ROAD
W
EST   BR
AN
C
H
SALMON  BROOK
TO SIMSBURY
TO ROUTE 20
7
%
1
%
8
3
COORDINATE GRID
A
D
           
CONNECTICUT
               
TC = 5 MIN
C = 0.950
A = 0.051 AC
C - FE - STA 12+62.00, 6.00' LT
TC = 5 MIN
C = 0.950
A =0.016 AC
C - FE - STA 12+41.00, 14.00' RT
TC = 13 MIN
C = 0.310
A = 0.272 AC
STA 16+00.00 44.00' RT
eCB
TC = 29 MIN
C = 0.440
A 0.625 AC
STA 16+47.00, 5.00' RT
C - e CB
TC = 5 MIN
C = 0.654
A = 0.070 AC
STA 15+85.00, 37.00' RT
C - eCB
TC = 28 MIN
C = 0.360
A = 1.73 AC
STA 18+16.00, 13.00' RT
C - CL-EW
GLASTONBURY, CT  06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
 DRAWING TITLE:
EXS
TOWN(S):
 
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD 
PLOTTED DATE:
c:\bms\2\lbususer\d0153873\HW_CP_0055-0145_EX-DRAINAGE.dgn   FILE NAME: Deegan  LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
      
      
      
      
      
      
        
        
        
        
        
        
                                        
                                        
                                        
                                        
                                        
                                        
0055-0145
DESIGNER/DRAFTER: CHECKED BY:
DRAINAGE MAP - EXISTING
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
 
 
 
0
1" = 40'
HORIZONTAL SCALE
40' 80'

Page 108

10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
19+00
50+00
291'
292'
2
9
3
'
2
9
4
'
2
9
5
'
2
9
6
'
2
9
7
'
2
9
8
' 2
9
9
'
300' 301' 302' 303' 304' 3 0
5
' 3
0
6
'
3
0
7
'
3
0
8
'
3
0
9
'
3
1
0
'
311'
312'
313'
314'
315'
316'
317'
318'
319'
320'
321'
322'
323'
324'
OHW-1
OHW-2
OHW-3
OHW-4
OHW-5
OHW-6
CT3-1
CT3-2
CT3-3
OHW-6A
OHW-7A
OHW-8A
OHW-5A
OHW-4A
OHW-3A
OHW-2A
OHW-1A
CT1-10
CT1-9
CT1-8
CT1-7
CT1-6
CT1-5
CT1-4
CT1-3
CT1-2
CT1-1
W1-1
W1-2
W1-3
W1-4
W1-5
IWC1-1
IWC1-2
IWC1-3
IWC1-4
IWC1-5
IWC1-6
IWC1-7
H
O
LC
O
M
B
 H
ILL R
O
A
D
SIMSBURY ROAD
W
EST   BR
AN
C
H
SALMON  BROOK
TO SIMSBURY
TO ROUTE 20
TC = 13 MIN
C = 0.303
A = 0.272 AC
44.00' RT
C - eCB-STA 16+10.00, 
TC = 28 MIN
C = 0.334
A = 1.705 AC
18+16.00, 20.00' RT
C - L - EW- STA 
TC = 5 MIN
C = 0.654
A = 0.070 AC
 37.00' RT
C - eCB-STA 15+85.00,
TC = 5 MIN
C = 0.95
A = 0.108 AC
15.00' LT
C - FE-STA 12+71.00, 
TC = 5 MIN
C = 0.95
A = 0.028 AC
15.00' RT
C - FE-STA 12+14.00, 
TC = 5 MIN
C = 0.950
A = 0.011 AC
15.00' RT
C-CB-STA 16+36.00, 
8
3
COORDINATE GRID
A
D
           
CONNECTICUT
               
 
 
0
1" = 40'
HORIZONTAL SCALE
40' 80'
GLASTONBURY, CT  06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/16/2025
  DRAWING TITLE:
PRO
TOWN(S):
 
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD 
PLOTTED DATE:
c:\bms\2\lbususer\d0153873\HW_CP_0055-0145_PRO-DRAINAGE.dgn   FILE NAME: USJH683007  LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
      
      
      
      
      
      
        
        
        
        
        
        
                                        
                                        
                                        
                                        
                                        
                                        
0055-0145
DESIGNER/DRAFTER: CHECKED BY:
DRAINAGE MAP - PROPOSED
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
 
TC = 27 MIN
C = 0.396
A = 0.919 AC
16+31.00, 21.00' RT
C - CB-C-L-STA 

Page 109

APPENDIX
D STORMWATER
DRAINAGE
HYDROLOGIC
INFORMATION

Page 110

/0/1/2/2□/2/4/5/6/7□/8/9/10□/11/12/5/13/14/15□/8/16/10□/11/15/17/7/18/12/19□/20
/21/12/22/6/4/18/12/19□/19/6/14/15/23□/24/15/7/4□/25/17/6/19/26/27/10□/28/12/19/19/15/22/4/18/22/13/4/10□/29/30/2/31
/21/6/4/18/4/13/32/15/23□/9/8/33/34/9/8/35/36/10□/21/12/19/37/18/4/13/32/15/23□/38/39/40/33/41/20/9/20/36
/42/5/15/43/6/4/18/12/19/23□/20/16/16□/44/4/31/31
/45□/47/48/49/50/51/52/53□/54/55/56/57□/58/59/60/47
/45/45□/47/48/49/50/51/52/53□/61/55/62/55
/63/1/64/0/65□/63/66/42/28/64/63/64/65/2/65/64/1/0□/67/66/42/68/29/42/0/28/69□/42/30/65/64/70/2/65/42/30
/55/59/71/72/59□/73/52/50/74/51/59/75□/55/59/71/76/50/59□/73/59/77/78/48/77/74/51/75□/58/74/51/79/59/52/78□/55/80/81□/82/59/49/50/52/71/80/75 □/83/59/50/78□/84/50/85/60/59/78/49/86/75□/87/59/78/52□/61/71/50/49/79/75□/88/50/78/59/71□/89/74/78/79/74/80/52
/90/88/91/91/75□/90/59/80/74/48/71/59/78□/89/52/59/80/79/52/50□/55/52/50/77/74/51/52/75□/55/74/78/77/52/50□/55/60/50/74/71/92/75□/58/59/50/85 /78/59/71/76
/93/94/95/96/97/98/99/100/97/101 □/102□ /93/94/95/103/101/97/104/105/106/107/97/100 □/102□ /108/97/104/109/95/110/95/97/111/101/106/97/100/109
/63/67□/4/6/26/13/5/6/17
/63/112/30 /38/26/6/7/15/32□/113/12/18/19/4□/113/17/15/22/18/113/18/4/6/4/18/12/19□/44/17/15/114/13/15/19/22/27□/15/7/4/18/14/6/4/15/7□/115/18/4/116 □/34/16/117□/22/12/19/44/18/32/15/19/22/15□/18/19/4/15/17/43/6/5/7□/118/18/19□ /18/19/22/116/15/7/119/116/12/13/17 /120/8
/112/13/17/6/4/18/12/19
/2/43/15/17/6/37/15□/17/15/22/13/17/17/15/19/22/15□/18/19/4/15/17/43/6/5□/118/27/15/6/17/7/120
/8 /40 /35 /8/16 /40/35 /35/16 /8/16/16 /40/16/16 /35/16/16 /8/16/16/16
/35/38/14/18/19 /9/33/40/16 /121/122/81/123/122/124/125/81/126/127/128 /35/33/16/16 /121/122/81/129/125/124/130/81/126/130/128 /131/33/20/40 /121/126/81/129/125/124/129/81/132/129/128 /39/33/9/20 /121/125/81/130/130/124/133/81/130/134/128 /41/33/34/9 /121/130/81/130/132/124/132/123/81/123/128 /8/16/33/8 /121/134/81/122/123/124/132/126/81/132/128 /8/8/33/20 /121/134/81/133/126/124/132/130/81/122/128 /8/40/33/131 /121/129/81/126/125/124/132/129/81/134/128 /8/9/33/9 /121/133/81/122/125/124/123/123/81/122/128 /8/35/33/34 /121/132/127/81/132/124/123/125/81/132/128
/8/16/38/14/18/19 /40/33/34/41 /121/123/81/123/133/124/122/81/129/122/128 /20/33/35/35 /121/123/81/134/122/124/126/81/125/134/128 /9/33/9/41 /121/122/81/126/122/124/125/81/129/127/128 /35/33/40/131 /121/126/81/127/132/124/130/81/129/125/128 /131/33/20/9 /121/126/81/130/133/124/129/81/130/122/128 /39/33/8/35 /121/125/81/132/129/124/133/81/133/125/128 /39/33/34/34 /121/125/81/130/122/124/132/132/81/130/128 /41/33/34/8 /121/125/81/133/129/124/132/122/81/122/128 /8/16/33/40 /121/130/81/130/132/124/132/125/81/129/128 /8/8/33/20 /121/134/81/132/122/124/132/134/81/129/128
/8/35/38/14/18/19 /40/33/20/20 /121/132/81/129/127/124/122/81/127/127/128 /40/33/39/41 /121/123/81/132/126/124/122/81/125/133/128 /20/33/35/40 /121/123/81/134/127/124/126/81/125/125/128 /9/33/8/20 /121/122/81/132/125/124/125/81/122/134/128 /9/33/34/39 /121/122/81/130/129/124/130/81/134/134/128 /35/33/131/16 /121/126/81/127/130/124/134/81/129/132/128 /131/33/40/131 /121/126/81/126/123/124/133/81/127/134/128 /131/33/34/34 /121/126/81/134/127/124/132/127/81/126/128 /41/33/16/8 /121/125/81/132/133/124/132/123/81/126/128 /41/33/41/9 /121/125/81/125/133/124/132/126/81/127/128
/20/16/38/14/18/19 /8/33/35/41 /121/132/81/123/123/124/123/81/127/126/128 /8/33/41/34 /121/132/81/126/130/124/123/81/126/126/128 /40/33/9/16 /121/132/81/129/126/124/122/81/132/132/128 /40/33/41/40 /121/123/81/132/125/124/122/81/130/129/128 /20/33/9/8 /121/123/81/125/123/124/126/81/130/126/128 /20/33/41/9 /121/123/81/134/133/124/125/81/122/130/128 /9/33/20/16 /121/122/81/127/122/124/130/81/123/123/128 /9/33/41/16 /121/122/81/123/123/124/134/81/132/125/128 /35/33/35/8 /121/122/81/125/134/124/129/81/125/132/128 /131/33/16/41 /121/122/81/129/125/124/133/81/130/127/128
/131/16/38/14/18/19 /8/33/16/16 /121/127/81/134/134/127/124/132/81/123/133/128 /8/33/40/16 /121/127/81/133/123/123/124/132/81/125/126/128 /8/33/35/40 /121/132/81/132/134/124/132/81/133/134/128 /8/33/39/34 /121/132/81/122/134/124/123/81/122/122/128 /40/33/8/131 /121/132/81/130/127/124/123/81/133/125/128 /40/33/9/9 /121/132/81/134/134/124/122/81/126/127/128 /40/33/39/20 /121/132/81/133/122/124/122/81/133/130/128 /20/33/16/35 /121/123/81/127/125/124/126/81/125/126/128 /20/33/35/16 /121/123/81/123/134/124/125/81/126/123/128 /20/33/41/39 /121/123/81/126/125/124/130/81/132/132/128
/40/38/116/17 /16/33/131/9/20 /121/127/81/126/133/129/124/127/81/129/123/123/128 /16/33/39/131/41 /121/127/81/125/133/125/124/127/81/133/129/126/128 /16/33/34/39/9 /121/127/81/134/125/132/124/132/81/123/125/128 /8/33/8/9 /121/127/81/129/134/129/124/132/81/126/129/128 /8/33/20/41 /121/132/81/127/122/124/132/81/129/134/128 /8/33/35/35 /121/132/81/132/126/124/123/81/132/130/128 /8/33/39/9 /121/132/81/123/126/124/123/81/125/123/128 /8/33/34/131 /121/132/81/122/123/124/123/81/133/127/128 /40/33/40/41 /121/132/81/126/129/124/122/81/125/127/128 /40/33/35/9 /121/132/81/130/132/124/126/81/127/127/128
/20/38/116/17 /16/33/9/34/40 /121/127/81/122/129/123/124/127/81/130/123/134/128 /16/33/35/34/16 /121/127/81/126/125/129/124/127/81/134/125/123/128 /16/33/39/9/34 /121/127/81/125/129/127/124/127/81/133/130/127/128 /16/33/41/41/40 /121/127/81/130/134/133/124/132/81/132/126/128 /8/33/16/131 /121/127/81/134/133/134/124/132/81/126/126/128 /8/33/40/16 /121/127/81/129/129/123/124/132/81/130/134/128 /8/33/20/9 /121/127/81/133/130/125/124/132/81/133/130/128 /8/33/35/40 /121/132/81/127/122/124/123/81/123/125/128 /8/33/39/41 /121/132/81/132/130/124/123/81/134/126/128 /40/33/16/8 /121/132/81/123/129/124/122/81/132/125/128
/131/38/116/17 /16/33/20/16/34 /121/127/81/123/126/123/124/127/81/122/133/132/128 /16/33/20/39/35 /121/127/81/123/133/122/124/127/81/126/134/125/128 /16/33/9/41/20 /121/127/81/122/134/130/124/127/81/130/132/126/128 /16/33/35/39/40 /121/127/81/126/126/122/124/127/81/134/122/123/128 /16/33/131/34/35 /121/127/81/125/123/126/124/127/81/133/122/133/128 /16/33/39/41/35 /121/127/81/125/129/123/124/132/81/127/133/128 /16/33/41/41/9 /121/127/81/130/126/132/124/132/81/123/133/128 /8/33/16/8 /121/127/81/130/129/123/124/132/81/126/129/128 /8/33/40/16 /121/127/81/134/129/123/124/132/81/129/122/128 /8/33/20/39 /121/127/81/129/134/123/124/123/81/132/122/128
/8/40/38/116/17 /16/33/8/41/41 /121/127/81/132/126/129/124/127/81/123/122/130/128 /16/33/40/20/20 /121/127/81/132/129/122/124/127/81/123/133/122/128 /16/33/20/16/35 /121/127/81/123/122/133/124/127/81/122/129/130/128 /16/33/20/131/131 /121/127/81/123/129/125/124/127/81/126/130/125/128 /16/33/9/9/34 /121/127/81/122/126/132/124/127/81/130/127/125/128 /16/33/35/8/16 /121/127/81/122/129/132/124/127/81/134/127/134/128 /16/33/35/39/39 /121/127/81/126/123/123/124/127/81/129/126/132/128 /16/33/131/131/20 /121/127/81/126/125/127/124/127/81/133/134/123/128 /16/33/41/16/16 /121/127/81/125/123/122/124/132/81/123/123/128 /16/33/34/40/16 /121/127/81/125/129/129/124/132/81/126/122/128
/40/9/38/116/17 /16/33/8/8/16 /121/127/81/127/129/134/124/127/81/132/122/129/128 /16/33/8/20/34 /121/127/81/132/132/127/124/127/81/132/134/126/128 /16/33/8/41/131 /121/127/81/132/126/134/124/127/81/123/122/126/128 /16/33/40/40/131 /121/127/81/132/134/134/124/127/81/123/129/125/128 /16/33/40/41/16 /121/127/81/123/132/126/124/127/81/122/134/130/128 /16/33/20/8/34 /121/127/81/123/126/127/124/127/81/126/126/132/128 /16/33/20/131/20 /121/127/81/123/130/129/124/127/81/125/123/133/128 /16/33/9/40/16 /121/127/81/123/129/130/124/127/81/130/132/122/128 /16/33/35/8/9 /121/127/81/122/122/134/124/127/81/134/134/133/128 /16/33/35/34/39 /121/127/81/122/129/122/124/127/81/133/123/126/128
/40/38/32/6/27 /16/33/16/131/40 /121/127/81/127/126/133/124/127/81/127/134/134/128 /16/33/16/39/34 /121/127/81/127/130/122/124/127/81/127/133/133/128 /16/33/8/16/41 /121/127/81/127/129/130/124/127/81/132/122/125/128 /16/33/8/20/40 /121/127/81/132/127/126/124/127/81/132/130/125/128 /16/33/8/131/9 /121/127/81/132/123/134/124/127/81/123/123/127/128 /16/33/8/41/41 /121/127/81/132/126/122/124/127/81/123/130/127/128 /16/33/40/8/35 /121/127/81/132/130/127/124/127/81/122/132/126/128 /16/33/40/35/8 /121/127/81/132/134/132/124/127/81/122/130/125/128 /16/33/20/8/8 /121/127/81/123/127/125/124/127/81/126/134/127/128 /16/33/20/131/131 /121/127/81/123/122/125/124/127/81/125/130/122/128
/20/38/32/6/27 /16/33/16/9/35 /121/127/81/127/122/130/124/127/81/127/125/130/128 /16/33/16/35/41 /121/127/81/127/126/130/124/127/81/127/134/123/128 /16/33/16/39/34 /121/127/81/127/130/122/124/127/81/127/133/129/128 /16/33/16/34/131 /121/127/81/127/134/130/124/127/81/132/123/127/128 /16/33/8/40/16 /121/127/81/127/133/122/124/127/81/132/130/132/128 /16/33/8/20/39 /121/127/81/132/127/125/124/127/81/132/133/127/128 /16/33/8/35/39 /121/127/81/132/132/129/124/127/81/123/123/133/128 /16/33/8/41/9 /121/127/81/132/123/130/124/127/81/123/130/134/128 /16/33/40/40/34 /121/127/81/132/125/132/124/127/81/122/126/125/128 /16/33/40/39/16 /121/127/81/132/134/126/124/127/81/126/132/126/128
/9/38/32/6/27 /16/33/16/20/131 /121/127/81/127/123/133/124/127/81/127/126/125/128 /16/33/16/9/39 /121/127/81/127/122/134/124/127/81/127/125/134/128 /16/33/16/131/20 /121/127/81/127/125/132/124/127/81/127/134/133/128 /16/33/16/39/39 /121/127/81/127/130/132/124/127/81/127/133/130/128 /16/33/16/34/131 /121/127/81/127/134/125/124/127/81/132/123/133/128 /16/33/8/8/16 /121/127/81/127/129/126/124/127/81/132/125/123/128 /16/33/8/40/131 /121/127/81/127/133/125/124/127/81/132/129/126/128 /16/33/8/9/41 /121/127/81/132/127/132/124/127/81/123/132/122/128 /16/33/8/41/9 /121/127/81/132/123/132/124/127/81/123/134/130/128 /16/33/40/8/39 /121/127/81/132/126/127/124/127/81/122/122/123/128
/39/38/32/6/27 /16/33/16/40/35 /121/127/81/127/123/127/124/127/81/127/122/127/128 /16/33/16/20/8 /121/127/81/127/123/125/124/127/81/127/122/129/128 /16/33/16/9/40 /121/127/81/127/122/126/124/127/81/127/125/123/128 /16/33/16/35/8 /121/127/81/127/126/132/124/127/81/127/130/126/128 /16/33/16/131/9 /121/127/81/127/126/133/124/127/81/127/129/126/128 /16/33/16/39/20 /121/127/81/127/125/130/124/127/81/127/133/133/128 /16/33/16/41/20 /121/127/81/127/130/123/124/127/81/132/123/127/128 /16/33/16/34/131 /121/127/81/127/130/130/124/127/81/132/122/133/128 /16/33/8/8/34 /121/127/81/127/134/133/124/127/81/132/134/129/128 /16/33/8/9/16 /121/127/81/127/133/127/124/127/81/123/132/122/128
/8/16/38/32/6/27 /16/33/16/40/16 /121/127/81/127/132/130/124/127/81/127/123/125/128 /16/33/16/40/35 /121/127/81/127/123/127/124/127/81/127/122/132/128 /16/33/16/20/20 /121/127/81/127/123/134/124/127/81/127/126/132/128 /16/33/16/9/16 /121/127/81/127/122/123/124/127/81/127/126/133/128 /16/33/16/9/34 /121/127/81/127/122/129/124/127/81/127/130/126/128 /16/33/16/35/35 /121/127/81/127/126/123/124/127/81/127/134/125/128 /16/33/16/131/20 /121/127/81/127/126/134/124/127/81/127/133/127/128 /16/33/16/39/20 /121/127/81/127/125/127/124/127/81/132/127/125/128 /16/33/16/41/34 /121/127/81/127/125/133/124/127/81/132/122/122/128 /16/33/8/16/9 /121/127/81/127/130/134/124/127/81/132/125/133/128
/40/16/38/32/6/27 /16/33/16/8/9 /121/127/81/127/132/123/124/127/81/127/132/134/128 /16/33/16/8/39 /121/127/81/127/132/126/124/127/81/127/123/132/128 /16/33/16/40/8 /121/127/81/127/132/134/124/127/81/127/123/130/128 /16/33/16/40/9 /121/127/81/127/123/127/124/127/81/127/122/127/128 /16/33/16/40/34 /121/127/81/127/123/122/124/127/81/127/122/129/128 /16/33/16/20/20 /121/127/81/127/123/125/124/127/81/127/126/126/128 /16/33/16/20/39 /121/127/81/127/123/134/124/127/81/127/125/123/128 /16/33/16/9/8 /121/127/81/127/123/133/124/127/81/127/125/133/128 /16/33/16/9/34 /121/127/81/127/122/122/124/127/81/127/134/122/128 /16/33/16/35/131 /121/127/81/127/122/130/124/127/81/127/129/130/128
/20/16/38/32/6/27 /16/33/16/8/40 /121/127/81/127/132/127/124/127/81/127/132/126/128 /16/33/16/8/9 /121/127/81/127/132/132/124/127/81/127/132/134/128 /16/33/16/8/131 /121/127/81/127/132/122/124/127/81/127/123/127/128 /16/33/16/8/34 /121/127/81/127/132/125/124/127/81/127/123/122/128 /16/33/16/40/40 /121/127/81/127/132/134/124/127/81/127/123/129/128 /16/33/16/40/9 /121/127/81/127/132/133/124/127/81/127/122/123/128 /16/33/16/40/39 /121/127/81/127/123/127/124/127/81/127/122/134/128 /16/33/16/20/16 /121/127/81/127/123/132/124/127/81/127/126/122/128 /16/33/16/20/35 /121/127/81/127/123/122/124/127/81/127/125/123/128 /16/33/16/20/34 /121/127/81/127/123/125/124/127/81/127/125/133/128
/9/35/38/32/6/27 /16/33/16/8/16 /121/127/81/127/127/129/124/127/81/127/132/123/128 /16/33/16/8/8 /121/127/81/127/127/133/124/127/81/127/132/122/128 /16/33/16/8/20 /121/127/81/127/132/132/124/127/81/127/132/130/128 /16/33/16/8/35 /121/127/81/127/132/123/124/127/81/127/132/129/128 /16/33/16/8/39 /121/127/81/127/132/122/124/127/81/127/123/132/128 /16/33/16/8/41 /121/127/81/127/132/126/124/127/81/127/123/126/128 /16/33/16/40/16 /121/127/81/127/132/125/124/127/81/127/123/129/128 /16/33/16/40/40 /121/127/81/127/132/125/124/127/81/127/122/132/128 /16/33/16/40/35 /121/127/81/127/132/130/124/127/81/127/122/134/128 /16/33/16/40/39 /121/127/81/127/132/134/124/127/81/127/126/132/128
/131/16/38/32/6/27 /16/33/16/16/34 /121/127/81/127/127/134/124/127/81/127/132/127/128 /16/33/16/16/34 /121/127/81/127/127/129/124/127/81/127/132/132/128 /16/33/16/8/8 /121/127/81/127/127/133/124/127/81/127/132/122/128 /16/33/16/8/40 /121/127/81/127/132/127/124/127/81/127/132/125/128 /16/33/16/8/9 /121/127/81/127/132/132/124/127/81/127/132/129/128 /16/33/16/8/35 /121/127/81/127/132/123/124/127/81/127/123/127/128 /16/33/16/8/39 /121/127/81/127/132/123/124/127/81/127/123/123/128 /16/33/16/8/41 /121/127/81/127/132/123/124/127/81/127/123/125/128 /16/33/16/40/16 /121/127/81/127/132/122/124/127/81/127/123/133/128 /16/33/16/40/8 /121/127/81/127/132/126/124/127/81/127/122/123/128
/132□/73/50/52/51/74/60/74/80/59/80/74/48/71□/135/50/52/136/49/52/71/51/85□/121/73/137/128□/52/47/80/74/138/59/80/52/47□/74/71□/80/79/74/47□/80/59/139 /78/52□/59/50/52□/139/59/47/52/76□/48/71□/135/50/52/136/49/52/71/51/85□/59/71/59/78/85/47/74/47□/48/135□ /60/59/50/80/74/59/78□/76/49/50/59/80/74/48/71□/47/52/50/74/52/47□/121/73/87/55/128 /81
/90/49/138/139/52/50/47□/74/71□/60/59/50/52/71/80/79/52/47/74/47□/59/50/52□/73/137□/52/47/80/74/138/59/80/52/47□/59/80□/78/48/140/52/50□/59/71 /76□/49/60/60/52/50□/139/48/49/71/76/47□/48/135□/80/79/52□/133/127/141□/51/48/71/135/74/76/52/71/51/52□/74/71/80/52/50/77/59/78/81□/84/79/52□ /60/50/48/139/59/139/74/78/74/80/85□/80/79/59/80□/60/50/52/51/74/60/74/80/59/80/74/48/71□/135/50/52/136/49/52/71/51/85□/52/47/80/74/138/59/80/52/47□ /121/135/48/50
/59□/92/74/77/52/71□/76/49/50/59/80/74/48/71□/59/71/76□/59/77/52/50/59/92/52□/50/52/51/49/50/50/52/71/51/52□/74/71/80/52/50/77/59/78/128□/140 /74/78/78□/139/52□/92/50/52/59/80/52/50□/80/79/59/71□/80/79/52□/49/60/60/52/50□/139/48/49/71/76□/121/48/50□/78/52/47/47□/80/79/59/71□/80 /79/52□/78/48/140/52/50□/139/48/49/71/76/128□/74/47□/125/141/81□/54/47/80/74/138/59/80/52/47□/59/80□/49/60/60/52/50□/139/48/49/71/76/47□/59/50 /52□/71/48/80
/51/79/52/51/86/52/76□/59/92/59/74/71/47/80□/60/50/48/139/59/139/78/52□/138/59/142/74/138/49/138□/60/50/52/51/74/60/74/80/59/80/74/48/71□/121/73/58/73 /128□/52/47/80/74/138/59/80/52/47□/59/71/76□/138/59/85□/139/52□/79/74/92/79/52/50□/80/79/59/71□/51/49/50/50/52/71/80/78/85□/77/59/78/74/76□ /73/58/73□/77/59/78/49/52/47/81
/73/78/52/59/47/52□/50/52/135/52/50□/80/48□/90/88/91/91□/91/80/78/59/47□/132/126□/76/48/51/49/138/52/71/80□/135/48/50□/138/48/50/52□/74/71/135 /48/50/138/59/80/74/48/71/81
/143/97/107/144□/96/146□/147/146/104
/63/67□/37/17/6/113/116/18/22/6/5
/132/127/148/122/148/123/125/75□/123/53/126/129□/73/58 /73/50/52/51/74 /60/74/80/59/80/74/48/71□/137/50/52 /136/49/52/71/51 /85□/87/59/80/59□/55/52/50/77/52/50
/79/80/80 /60/47/53/148/148/79/76/47/51/81/71/140/47/81/71/48/59/59/81 /92/48/77/148 /60/135/76/47/148 /60/135/76/47 /149/60 /50/74/71/80 /60/59/92/52/81/79/80/138/78/150/78/59/80/151/126/132/81/133/126/132/125/152/78/48/71/151/153/134/123/81/129/122/126/122/152/76/59/80/59/151/74/71/80/52/71/47/74/80 /85/152/49/71/74/80/47/151/52/71 /92/78/74/47/79/152/47/52/50/74/52/47/151 /60/76/47 /132/148/126

Page 111

/0/1/2/3□/5/6□/7/6/8
/9/10/11/12□/14□/10/15/16/17/10/18/12
/19/20/10/18/18□/12/21/10/18/15□/22/15/16/16/10/17/23
/24/25/26/27/26/28/29/30□/28/32/33/34□/35/36 /35/37/38/39/40 /41/40/42/43/42/40/44/45□/46/37/38 /47/48/38/45/39 /49□/50/43/42/43□/51/38/37/52/38/37
/53/42/42 /41/54/32/26/26/53/55/54/39/56/45/57/54/56/45/44/43/43/56 /58/44/52/26 /41/59/55/54/26 /41/59/55/54 /60/41 /37/40/45/42 /41/43/58/38/56/53/42/61/62/63/62/43/42/64/33/24/56/65/33/24/29/66/62/44/45/64/67/68/28/56/34/27/33/27/66/55/43/42/43/64/40/45/42/38/45/54/40/42 /49/66/48/45/40/42/54/64/38/45 /58/62/40/54/53/66/54/38/37/40/38/54/64 /41/55/54 /28/26/33

Page 112

/0/1/2/3/4□/6/7/1/8/4□/9/4/2/2/1/10/11
/0/1/2/3/4□/6/7/1/8/4□/12/1/13
/0/1/2/3/4□/6/7/1/8/4□/1/4/2/10/1/8
/14
/15
/16/17/18
/19/18/20
/14
/15
/21/22/22/17/18
/23/22/18/20
/14
/15
/21/22/22/17/18
/23/22/18/20
/24/25/26/27/26/28/29/30□/28/32/33/34□/35/36 /35/37/38/39/40 /41/40/42/43/42/40/44/45□/46/37/38 /47/48/38/45/39 /49□/50/43/42/43□/51/38/37/52/38/37
/53/42/42 /41/54/32/26/26/53/55/54/39/56/45/57/54/56/45/44/43/43/56 /58/44/52/26 /41/59/55/54/26 /41/59/55/54 /60/41 /37/40/45/42 /41/43/58/38/56/53/42/61/62/63/62/43/42/64/33/24/56/65/33/24/29/66/62/44/45/64/67/68/28/56/34/27/33/27/66/55/43/42/43/64/40/45/42/38/45/54/40/42 /49/66/48/45/40/42/54/64/38/45 /58/62/40/54/53/66/54/38/37/40/38/54/64 /41/55/54 /27/26/33

Page 113

/0/1/2/3□/5/6□/7/6/8
/9/10□/11/12/8/1/13/5/14/12/15/5□/6/16□/17/6/14/14/12/13/2/12
/18/1/5/19/6/15/1/20□/21/2/12/1/15/19/2□/1/15/22□/23/5/14/6/24/8/25/12/13/19/2□/23/22/14/19/15/19/24/5/13/1/5/19/6/15
/18/1/5/19/6/15/1/20□/26/12/1/5/25/12/13□/10/12/13/27/19/2/12
/18/1/5/19/6/15/1/20□/26/1/5/12/13□/17/12/15/5/12/13
/28/29/30/31□/33/34/35/36□/37/38/35/36□/39/40/41/42/43/34/44
/45/40/46/47/38/48□/45/49/48/40/50/41/51□/52/53□/30/54/55/28/54
/56/57/38/35/36/40/58/50/35/59/60□ /61/11/10/17/62/63/64/12/24/5/19/6/15/24/65/15/6/1/1/62/66/6/27
/11/19/24/2/20/1/19/14/12/13
/67
/68
/69/70/70/71/72
/73/70/72/74
/75/76/77/78/77/79/80/81□/79/83/84/85□/86/87 /86/88/89/90/91 /92/91/93/94/93/91/95/96□/97/88/89 /98/99/89/96/90 /100□/101/94/93/94□/102/89/88/103/89/88
/104/93/93 /92/105/83/77/77/104/106/105/90/107/96/108/105/107/96/95/94/94/107 /109/95/103/77 /92/110/106/105/77 /92/110/106/105 /111/92 /88/91/96/93 /92/94/109/89/107/104/93/112/113/114/113/94/93/115/84/75/107/116/84/75/80/117/113/95/96/115/118/119/79/107/85/78/84/78/117/106/94/93/94/115/91/96/93/89/96/105/91/93 /100/117/99/96/91/93/105/115/89/96 /109/113/91/105/104/117/105/89/88/91/89/105/115 /92/106/105 /84/77/84

Page 114

Hydrologic Soil Group—State of Connecticut, Western Part
(Simsbury Road, Granby, CT)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
10/2/2025
Page 1 of 5
4644700 4644900 4645100 4645300 4645500 4645700 4645900 4646100 4646300 4646500 4646700 4646900 4647100
4644700 4644900 4645100 4645300 4645500 4645700 4645900 4646100 4646300 4646500 4646700 4646900 4647100
678800 679000 679200 679400 679600 679800 680000 680200
678800 679000 679200 679400 679600 679800 680000 680200
41°  57' 21'' N
72°  50' 39'' W
41°  57' 21'' N
72°  49' 31'' W
41°  55' 58'' N
72°  50' 39'' W
41°  55' 58'' N
72°  49' 31'' WN
Map projection: Web Mercator   Corner coordinates: WGS84   Edge tics: UTM Zone 18N WGS84
0 300 600 1200 1800
Feet
0 100 200 400 600
Meters
Map Scale: 1:7,160 if printed on B portrait (11" x 17") sheet.

Page 115

MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at 
1:12,000.
Please rely on the bar scale on each map sheet for map 
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL: 
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator 
projection, which preserves direction and shape but distorts 
distance and area. A projection that preserves area, such as the 
Albers equal-area conic projection, should be used if more 
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as 
of the version date(s) listed below.
Soil Survey Area: State of Connecticut, Western Part
Survey Area Data: Version 6, Sep 16, 2025
Soil map units are labeled (as space allows) for map scales 
1:50,000 or larger.
Date(s) aerial images were photographed: Jun 14, 2022—Jul 1, 
2024
The orthophoto or other base map on which the soil lines were 
compiled and digitized probably differs from the background 
imagery displayed on these maps. As a result, some minor 
shifting of map unit boundaries may be evident.
Hydrologic Soil Group—State of Connecticut, Western Part
(Simsbury Road, Granby, CT)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
10/2/2025
Page 2 of 5

Page 116

Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
2 Ridgebury fine sandy 
loam, 0 to 3 percent 
slopes
D 3.4 0.7%
3 Ridgebury, Leicester, 
and Whitman soils, 0 
to 8 percent slopes, 
extremely stony
D 19.1 4.1%
12 Raypol silt loam, 0 to 3 
percent slopes
B/D 6.3 1.3%
23A Sudbury sandy loam, 0 
to 5 percent slopes
A/D 32.6 6.9%
29A Agawam fine sandy 
loam, 0 to 3 percent 
slopes
B 7.4 1.6%
29B Agawam fine sandy 
loam, 3 to 8 percent 
slopes
B 5.2 1.1%
34A Merrimac fine sandy 
loam, 0 to 3 percent 
slopes
A 12.9 2.7%
37C Manchester gravelly 
sandy loam, 3 to 15 
percent slopes
A 29.0 6.2%
37E Manchester gravelly 
sandy loam, 15 to 45 
percent slopes
A 7.2 1.5%
38A Hinckley loamy sand, 0 
to 3 percent slopes
A 2.8 0.6%
38C Hinckley loamy sand, 3 
to 15 percent slopes
A 75.3 16.0%
38E Hinckley loamy sand, 15 
to 45 percent slopes
A 10.6 2.3%
45B Woodbridge fine sandy 
loam, 3 to 8 percent 
slopes
C/D 17.7 3.8%
46B Woodbridge fine sandy 
loam, 0 to 8 percent 
slopes, very stony
C/D 48.8 10.4%
47C Woodbridge fine sandy 
loam, 3 to 15 percent 
slopes, extremely 
stony
C/D 15.4 3.3%
52C Sutton fine sandy loam, 
2 to 15 percent 
slopes, extremely 
stony
B/D 1.5 0.3%
Hydrologic Soil Group—State of Connecticut, Western Part Simsbury Road, Granby, CT
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
10/2/2025
Page 3 of 5

Page 117

Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
75E Hollis-Chatfield-Rock 
outcrop complex, 15 
to 45 percent slopes
D 1.4 0.3%
84B Paxton and Montauk 
fine sandy loams, 3 to 
8 percent slopes
C 33.5 7.1%
84C Paxton and Montauk 
fine sandy loams, 8 to 
15 percent slopes
C 16.5 3.5%
85B Paxton and Montauk 
fine sandy loams, 3 to 
8 percent slopes, very 
stony
C 20.3 4.3%
85C Paxton and Montauk 
fine sandy loams, 8 to 
15 percent slopes, 
very stony
C 20.2 4.3%
86C Paxton and Montauk 
fine sandy loams, 3 to 
15 percent slopes, 
extremely stony
C 8.4 1.8%
86D Paxton and Montauk 
fine sandy loams, 15 
to 35 percent slopes, 
extremely stony
C 1.6 0.3%
100 Suncook loamy fine 
sand
A 21.5 4.6%
101 Occum fine sandy loam B 44.9 9.6%
103 Rippowam fine sandy 
loam
B/D 3.2 0.7%
308 Udorthents, smoothed B 2.7 0.6%
Totals for Area of Interest 469.4 100.0%
Hydrologic Soil Group—State of Connecticut, Western Part Simsbury Road, Granby, CT
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
10/2/2025
Page 4 of 5

Page 118

Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are 
assigned to one of four groups according to the rate of water infiltration when the 
soils are not protected by vegetation, are thoroughly wet, and receive 
precipitation from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and 
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when 
thoroughly wet. These consist mainly of deep, well drained to excessively 
drained sands or gravelly sands. These soils have a high rate of water 
transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These 
consist chiefly of moderately deep or deep, moderately well drained or well 
drained soils that have moderately fine texture to moderately coarse texture. 
These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist 
chiefly of soils having a layer that impedes the downward movement of water or 
soils of moderately fine texture or fine texture. These soils have a slow rate of 
water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when 
thoroughly wet. These consist chiefly of clays that have a high shrink-swell 
potential, soils that have a high water table, soils that have a claypan or clay 
layer at or near the surface, and soils that are shallow over nearly impervious 
material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is 
for drained areas and the second is for undrained areas. Only the soils that in 
their natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified 
Tie-break Rule: Higher
Hydrologic Soil Group—State of Connecticut, Western Part Simsbury Road, Granby, CT
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
10/2/2025
Page 5 of 5

Page 119

Comp By: EAR 10/9/2025
Chkd By: SG 10/13/2025
Southwest (LEFT) Bridge curbline: FE-STA 12+62.00, 6.00' LT
Description Area (SF) C CA (SF) CA (ac)
Time of 
Concentration 
(min)
Impervious 2214 0.95 2103
Avg Slope (Hyd Grp A & B) 0 0.17 0
Total 2214 0.950 2103 0.049 5
0.051 ac
Southeast (RIGHT) Bridge curbline: FE-STA 12+41.00, 14.00' RT
Description Area (SF) C CA (SF) CA (ac)
Time of 
Concentration 
(min)
Impervious 683 0.95 649
Avg Slope (Hyd Grp A & B) 0 0.17 0
Total 683 0.950 649 0.015 5
0.016 ac
NORTH OF SIMSBURY RD AT HOLCOMB HILL ROAD INTERSECTION: eCB STA 16+47.00, 5.00' RT
Description Area (SF) C CA (SF) CA (ac)
Time of 
Concentration 
(min)
Impervious 9166 0.95 8708
Avg Slope (Hyd Grp A & B) 18038 0.17 3066
Total 27204 0.440 11774 0.271 29
0.625 ac
Existing L ENDWALL: cL-EW-STA 18+16.00, 13.00' RT
Description Area (SF) C CA (SF) CA (ac)
Time of 
Concentration 
(min)
Impervious 17509.5 0.95 16634
Avg Slope (Hyd Grp A & B) 57623.5 0.17 9796
Total 75133 0.360 26430 0.607 28
1.725 ac
HOLCOMB HILL ROAD EAST: eCB-STA 16+10.00, 44.00' RT
Description Area (SF) C CA (SF) CA (ac)
Time of 
Concentration 
(min)
Impervious 2,012 0.95 1911
Avg Slope (Hyd Grp A & B) 9815 0.17 1669
Total 11827 0.310 3580 0.083 13
0.272 ac
HOLCOMB HILL ROAD WEST  Curbline: eCB-STA 15+85.00, 37.00' RT
Description Area (SF) C CA (SF) CA (ac)
Time of 
Concentration 
(min)
Impervious 1893.75 0.95 1799
Avg Slope (Hyd Grp A & B) 1155.45 0.17 196.43
Total 3049.2 0.654 1995 0.046 5
.070 ac
BRIDGE NO. 04525
RATIONAL METHOD
Existing Condition
SIMSBURY RD OVER WEST BRANCH SALMON BROOK
STATE PROJECT NO. 0055-0145

Page 120

Comp By: EAR 10/9/2025
Chkd By: SG 10/13/2025
Southwest (LEFT) Bridge curbline: FE-STA 12+71.00, 15.00 LT
Description Area (SF) C CA (SF) CA (ac)
Time of 
Concentration 
(min)
Impervious 4704.48 0.95 4469
Avg Slope (Hyd Grp A & B) 0 0.17 0
Total 4704.48 0.950 4469 0.102 5
0.108 ac
Southeast (RIGHT) Bridge curbline: FE-STA 12+14.00, 15.00 RT
Description Area (SF) C CA (SF) CA (ac)
Time of 
Concentration 
(min)
Impervious 1219.68 0.95 1159
Avg Slope (Hyd Grp A & B) 0 0.17 0
Total 1219.68 0.950 1159 0.026 5
0.028 ac
PROPOSED - NORTH OF SIMSBURY RD AT HOLCOMB HILL ROAD INTERSECTION: CB-STA 16+36.00, 15.00' RT
Description Area (SF) C CA (SF) CA (ac)
Time of 
Concentration 
(min)
Impervious 479.16 0.95 455
Avg Slope (Hyd Grp A & B) 0 0.17 0
Total 479.16 0.950 455 0.010 5
0.011 ac
PROPOSED - IN GRASS NORTHEAST OF SIMSBURY RD AT HOLCOMB ROAD INTERSECTION: CB-C-L-STA 16+31.00, 21.00' RT
Description Area (SF) C CA (SF) CA (ac)
Time of 
Concentration 
(min)
Impervious 11773.341 0.95 11185
Avg Slope (Hyd Grp A & B) 28258.299 0.17 4804
Total 40031.64 0.396 15989 0.364 27
0.919 ac
PROPOSED L ENDWALL: L-EW-STA 18+16.00, 20.00' RT
Description Area (SF) C CA (SF) CA (ac)
Time of 
Concentration 
(min)
Impervious 15807.59 0.95 15017
Avg Slope (Hyd Grp A & B) 58462.21 0.17 9938.6
Total 74269.8 0.334 24956 0.569 28
1.705
HOLCOMB HILL ROAD EAST: eCB-STA 16+10.00, 44.00' RT
Description Area (SF) C CA (SF) CA (ac)
Time of 
Concentration 
(min)
Impervious 2,047 0.95 1944
Avg Slope (Hyd Grp A & B) 9801.5 0.17 1666
Total 11848.32 0.303 3611 0.082 13
0.272 ac
HOLCOMB HILL ROAD WEST  Curbline: eCB-STA 15+85.00, 37.00' RT
BRIDGE NO. 04525
RATIONAL METHOD
Proposed Condition
SIMSBURY RD OVER WEST BRANCH SALMON BROOK
STATE PROJECT NO. 0055-0145

Page 121

Comp By: EAR 10/9/2025
Chkd By: SG 10/13/2025
BRIDGE NO. 04525
RATIONAL METHOD
SIMSBURY RD OVER WEST BRANCH SALMON BROOK
STATE PROJECT NO. 0055-0145
Description Area (SF) C CA (SF) CA (ac)
Time of 
Concentration 
(min)
Impervious 1893.75 0.95 1799
Avg Slope (Hyd Grp A & B) 1155.45 0.17 196.43
Total 3049.2 0.654 1995 0.046 5
.070 ac

Page 122

PROJECT: SIMSBURY RD OVER WEST BRANCH SALMON BROOK DATE: 10/09/25 EAR
PROJECT NO.: 0055-0145
TOWN: Granby, CT DATE: 10/13/25 SG
ROUTE: Simsbury Road
LOCATION: PROPOSED IN GRASS NORTHEAST OF SIMSBURY RD AT HOLCOMB HILL ROAD INTERSECTION
Time of Concentration - CB-C-L-STA 16+31.00, 20.00' RT
TOTALS (min)
+ 10.8
+ 8.6
+ 5.4
+ 0.3
+ 0.7
+ 0.5
+ 0
26.3 SAY: 27
0.07
2-yr, 24-hr Rainfall Depth, P2 (in): 3.36 3.36
Sheet Flow Travel Time (min): 5.1 0.3
Surface Description: Unpaved Unpaved
Slope of Hydraulic Grade Line, S (ft/ft): 0.17 0.12
Average Velocity, V (ft/s): 6.73 5.57
Surface Description: Unpaved Unpaved
Flow Length, L (ft): 46 63
Flow Length, L (ft): 112
DESIGNED BY:
CHECKED BY:
Sheet Flow
Surface Description: Dense grasses Smooth asphalt
Slope of Hydraulic Grade Line, S (ft/ft): 0.02 0.05
2-yr, 24-hr Rainfall Depth, P2 (in): 3.36 3.36
Manning's Roughness Coefficient, n: 0.24 0.011
Flow Length, L (ft): 63 37.7
Manning's Roughness Coefficient, n: 0.011 0.24
Flow Length, L (ft): 34 59.7
Sheet Flow Travel Time (min): 10.4 0.4
Surface Description: Smooth asphalt Dense grasses
Sheet Flow Travel Time (min): 0.7 7.9
Shallow Concentrated
Slope of Hydraulic Grade Line, S (ft/ft): 0.01 0.03
2-yr, 24-hr Rainfall Depth, P2 (in): 3.36 3.36
Surface Description: Dense grasses Smooth asphalt
Manning's Roughness Coefficient, n: 0.24 0.011
Flow Length, L (ft): 36 29
Slope of Hydraulic Grade Line, S (ft/ft): 0.03
33.8
Slope of Hydraulic Grade Line, S (ft/ft): 0.06 0.03
Sheet Flow Travel Time (min): 0.1 0.2
Surface Description: Unpaved Unpaved
Open Channel Flow
Manning's Roughness Coefficient, n:
Average Velocity, V (ft/s): 3.89 2.98
Sheet Flow Travel Time (min): 0.5 0.2
Flow Length, L (ft): 112 4
Slope of Hydraulic Grade Line, S (ft/ft): 0.06 0.42
Average Velocity, V (ft/s): 3.89 10.52
Sheet Flow Travel Time (min): 0.5 0
Cross Sectional Flow Area, a (ft*ft):
Wetted Perimeter, pw (ft):
Flow Length, L (ft):
Slope of Hydraulic Grade Line, S (ft/ft):
Sheet Flow Travel Time (min): 0 0
Total Time of Concentration Path, Tt (min): 
Hydraulic Radius, r = a/pw (ft):
Average Velocity, V (ft/s):

Page 123

PROJECT: SIMSBURY RD OVER WEST BRANCH SALMON BROOK DATE: 10/09/25 EAR
PROJECT NO.: 55-145
TOWN: Granby, CT DATE: 10/10/25 SG
ROUTE: Simsbury Road
LOCATION: STA 18+16.00, 13.00' RT
Time of Concentration - Existing L Endwall
TOTALS (min)
+ 12.4
+ 14.6
+ 0.6
+ 0.1
+ 0
27.7 SAY: 28
Sheet Flow Travel Time (min): 0 0
Total Time of Concentration Path, Tt (min): 
Hydraulic Radius, r = a/pw (ft):
Average Velocity, V (ft/s):
Cross Sectional Flow Area, a (ft*ft):
Wetted Perimeter, pw (ft):
Flow Length, L (ft):
Slope of Hydraulic Grade Line, S (ft/ft):
Open Channel Flow
Manning's Roughness Coefficient, n:
Average Velocity, V (ft/s): 6 290.48
Sheet Flow Travel Time (min): 0.1 0
Flow Length, L (ft): 50.59 59.11
Slope of Hydraulic Grade Line, S (ft/ft): 0.14 324.13
Sheet Flow Travel Time (min): 0.5 0.1
Surface Description: Unpaved Unpaved
Slope of Hydraulic Grade Line, S (ft/ft): 0.04 0.16
Average Velocity, V (ft/s): 3.06 6.42
Surface Description: Unpaved Unpaved
Flow Length, L (ft): 83.4 28.4
Sheet Flow Travel Time (min): 5.1 9.5
Shallow Concentrated
Slope of Hydraulic Grade Line, S (ft/ft): 0.04 0.03
2-yr, 24-hr Rainfall Depth, P2 (in): 3.36 3.36
Manning's Roughness Coefficient, n: 0.24 0.24
Flow Length, L (ft): 39.4 78.12
Sheet Flow Travel Time (min): 6.9 5.5
Surface Description: Dense grasses Dense grasses
2-yr, 24-hr Rainfall Depth, P2 (in): 3.36 3.36
Manning's Roughness Coefficient, n: 0.24 0.24
Flow Length, L (ft): 53.23 46.6
DESIGNED BY:
CHECKED BY:
Sheet Flow
Surface Description: Dense grasses Dense grasses
Slope of Hydraulic Grade Line, S (ft/ft): 0.03 0.04

Page 124

PROJECT: SIMSBURY RD OVER WEST BRANCH SALMON BROOK DATE: 10/09/25 EAR
PROJECT NO.: 55-145
TOWN: Granby, CT DATE: 10/13/25 SG
ROUTE: Simsbury Road
LOCATION: STA 18+17.00, 22.00' RT
Time of Concentration - L-EW-STA 18+16.00, 20.00' RT
TOTALS (min)
+ 12.4
+ 14.6
+ 0.6
+ 0.2
+ 0
27.8 SAY: 28
DESIGNED BY:
CHECKED BY:
Sheet Flow
Surface Description: Dense grasses Dense grasses
Slope of Hydraulic Grade Line, S (ft/ft): 0.03 0.04
2-yr, 24-hr Rainfall Depth, P2 (in): 3.36 3.36
Manning's Roughness Coefficient, n: 0.24 0.24
Flow Length, L (ft): 53.23 46.6
Manning's Roughness Coefficient, n: 0.24 0.24
Flow Length, L (ft): 39.4 78.12
Sheet Flow Travel Time (min): 6.9 5.5
Surface Description: Dense grasses Dense grasses
Sheet Flow Travel Time (min): 5.1 9.5
Shallow Concentrated
Slope of Hydraulic Grade Line, S (ft/ft): 0.04 0.03
2-yr, 24-hr Rainfall Depth, P2 (in): 3.36 3.36
Slope of Hydraulic Grade Line, S (ft/ft): 0.04 0.18
Average Velocity, V (ft/s): 3.06 6.9
Surface Description: Unpaved Unpaved
Flow Length, L (ft): 83.4 52
Flow Length, L (ft): 38 40.77
Slope of Hydraulic Grade Line, S (ft/ft): 0.09 0.12
Sheet Flow Travel Time (min): 0.5 0.1
Surface Description: Unpaved Unpaved
Open Channel Flow
Manning's Roughness Coefficient, n:
Average Velocity, V (ft/s): 4.9 5.65
Sheet Flow Travel Time (min): 0.1 0.1
Cross Sectional Flow Area, a (ft*ft):
Wetted Perimeter, pw (ft):
Flow Length, L (ft):
Slope of Hydraulic Grade Line, S (ft/ft):
Sheet Flow Travel Time (min): 0 0
Total Time of Concentration Path, Tt (min): 
Hydraulic Radius, r = a/pw (ft):
Average Velocity, V (ft/s):

Page 125

PROJECT: SIMSBURY RD OVER WEST BRANCH SALMON BROOK DATE: 10/09/25 EAR
PROJECT NO.: 55-145
TOWN: Granby, CT DATE: 10/10/25 SG
ROUTE: Simsbury Road
LOCATION: EXISTING - NORTH OF SIMSBURY ROAD AT HOLCOMBB HILL ROAD INTERSECTION
Time of Concentration - Existing CB STA 16+47.00, 5.00' RT
TOTALS (min)
+ 12.8
+ 8.4
+ 6.1
+ 0.4
+ 0.6
+ 0
28.3 SAY: 29
Sheet Flow Travel Time (min): 0 0
Total Time of Concentration Path, Tt (min): 
Hydraulic Radius, r = a/pw (ft):
Average Velocity, V (ft/s):
Cross Sectional Flow Area, a (ft*ft):
Wetted Perimeter, pw (ft):
Flow Length, L (ft):
Slope of Hydraulic Grade Line, S (ft/ft):
Open Channel Flow
Manning's Roughness Coefficient, n:
Average Velocity, V (ft/s): 4.33 2.71
Sheet Flow Travel Time (min): 0.4 0.2
Flow Length, L (ft): 115 30.22
Slope of Hydraulic Grade Line, S (ft/ft): 0.07 0.03
Sheet Flow Travel Time (min): 0.1 0.3
Surface Description: Unpaved Unpaved
Slope of Hydraulic Grade Line, S (ft/ft): 0.05 0.15
Average Velocity, V (ft/s): 3.68 6.2
Surface Description: Unpaved Unpaved
Flow Length, L (ft): 11.72 109
Sheet Flow Travel Time (min): 0.5 7.9
Shallow Concentrated
Slope of Hydraulic Grade Line, S (ft/ft): 0.05 0.03
2-yr, 24-hr Rainfall Depth, P2 (in): 3.36 3.36
Surface Description: Dense grasses
Manning's Roughness Coefficient, n: 0.24
Flow Length, L (ft): 52.72
Slope of Hydraulic Grade Line, S (ft/ft): 0.04
52 37.7
Manning's Roughness Coefficient, n: 0.011 0.24
Flow Length, L (ft): 55.6 59
Sheet Flow Travel Time (min): 7.1 5.7
Surface Description: Smooth asphalt Dense grasses
2-yr, 24-hr Rainfall Depth, P2 (in): 3.36
Sheet Flow Travel Time (min): 6.1 0
DESIGNED BY:
CHECKED BY:
Sheet Flow
Surface Description: Dense grasses Dense grasses
Slope of Hydraulic Grade Line, S (ft/ft): 0.03 0.03
2-yr, 24-hr Rainfall Depth, P2 (in): 3.36 3.36
Manning's Roughness Coefficient, n: 0.24 0.24
Flow Length, L (ft):

Page 126

PROJECT: SIMSBURY RD OVER WEST BRANCH SALMON BROOK DATE: 10/09/25 EAR
PROJECT NO.: 55-145
TOWN: Granby, CT DATE: 10/13/25 SG
ROUTE: Simsbury Road
LOCATION: HOLCOMB HILL ROAD EAST
Time of Concentration - eCB- eCB-STA 16+10.00, 44.00' RT
TOTALS (min)
+ 8.6
+ 3.9
+ 0.5
+ 0
+ 0
13.0 SAY: 13
Sheet Flow Travel Time (min): 0 0
Total Time of Concentration Path, Tt (min): 
Hydraulic Radius, r = a/pw (ft):
Average Velocity, V (ft/s):
Cross Sectional Flow Area, a (ft*ft):
Wetted Perimeter, pw (ft):
Flow Length, L (ft):
Slope of Hydraulic Grade Line, S (ft/ft):
Open Channel Flow
Manning's Roughness Coefficient, n:
Average Velocity, V (ft/s):
Sheet Flow Travel Time (min): 0 0
Flow Length, L (ft):
Slope of Hydraulic Grade Line, S (ft/ft):
Sheet Flow Travel Time (min): 0.1 0.4
Surface Description:
Slope of Hydraulic Grade Line, S (ft/ft): 0.04 0.034367816
Average Velocity, V (ft/s): 3.23 3.77
Surface Description: Unpaved Paved
Flow Length, L (ft): 25 87
Sheet Flow Travel Time (min): 3.9 0
Shallow Concentrated
Slope of Hydraulic Grade Line, S (ft/ft): 0.036724201
2-yr, 24-hr Rainfall Depth, P2 (in): 3.36
Manning's Roughness Coefficient, n: 0.24
Flow Length, L (ft): 27.23
Sheet Flow Travel Time (min): 2.8 5.8
Surface Description: Dense grasses
2-yr, 24-hr Rainfall Depth, P2 (in): 3.36 3.36
Manning's Roughness Coefficient, n: 0.24 0.24
Flow Length, L (ft): 18.66 38.14
DESIGNED BY:
CHECKED BY:
Sheet Flow
Surface Description: Dense grasses Dense grasses
Slope of Hydraulic Grade Line, S (ft/ft): 0.04 0.026219192

Page 127

FlexTable: CTDOT Catchment Table
Catchment 
Rational Flow
(cfs)
Time of 
Concentration
(hours)
Catchment 
CA
(acres)
Area (Unified)
(acres)
Runoff 
Coefficient 
(Rational)
Outflow ElementLabelID
0.200.0830.0260.0280.950FE-STA 12+14.00, 15.00' RTC - FE-STA 12+14.00, 15.00' RT475
0.770.0830.1020.1080.950FE-STA 12+71.00, 15.00' LTC - FE-STA 12+71.00, 15.00' LT476
0.340.0830.0460.0700.654eCB-STA 15+85.00, 37.00' RTC - eCB-STA 15+85.00, 37.00' RT480
1.130.4500.3640.9190.396CB-C-L-STA 16+31.00, 21.00 RTC - C-L-CB-STA 16+31.00, 21.00' RT491
1.720.4670.5691.7050.334L - EW- STA 18+16.00, 20.00' RTC - L - EW- STA 18+16.00, 20.00' RT492
0.380.2170.0820.2720.303eCB-STA 16+10.00, 44.00' RTC - eCB-STA 16+10.00, 44.00' RT495
0.080.0830.0100.0110.950CB-STA 16+36.00, 15.00' RTC-CB-STA 16+36.00, 15.00' RT496
Page 1 of 110/16/2025
C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw
10 yr

Page 128

FlexTable: CTDOT Catchment Table
Catchment 
Rational Flow
(cfs)
Time of 
Concentration
(hours)
Catchment 
CA
(acres)
Area (Unified)
(acres)
Runoff 
Coefficient 
(Rational)
Outflow ElementLabelID
0.240.0830.0260.0280.950FE-STA 12+14.00, 15.00' RTC - FE-STA 12+14.00, 15.00' RT475
0.920.0830.1020.1080.950FE-STA 12+71.00, 15.00' LTC - FE-STA 12+71.00, 15.00' LT476
0.410.0830.0460.0700.654eCB-STA 15+85.00, 37.00' RTC - eCB-STA 15+85.00, 37.00' RT480
1.370.4500.3640.9190.396CB-C-L-STA 16+31.00, 21.00 RTC - C-L-CB-STA 16+31.00, 21.00' RT491
2.070.4670.5691.7050.334L - EW- STA 18+16.00, 20.00' RTC - L - EW- STA 18+16.00, 20.00' RT492
0.460.2170.0820.2720.303eCB-STA 16+10.00, 44.00' RTC - eCB-STA 16+10.00, 44.00' RT495
0.090.0830.0100.0110.950CB-STA 16+36.00, 15.00' RTC-CB-STA 16+36.00, 15.00' RT496
Page 1 of 110/16/2025
C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw
25 yr

Page 129

APPENDIX
EGUTTER FLOW
ANALYSIS

Page 130

PROJECT: SIMSBURY RD OVER WEST BRANCH SALMON BROOK DESIGNED BY: EAR DATE: 10/09/25
PROJECT NO.: 0055-0145
TOWN: Granby, CT CHECKED BY: SDG DATE: 10/13/25
ROUTE: Simsbury Road
LOCATION: See Below
Inlet ID Inlet Station and Offset Area in Acres (A) Runoff Coeff.     (C) Time to Inlet                (min.) Rainfall Intensity    (in/hr) CA Total CA Catchment Rational Flow    (cfs) Grade of Gutter ft/ft (SL) Cross Slope Of Shoulde r ft/ft (Sx) Depth of Flow of Gutter     (ft) Gutter Flow Width       (ft) Allowable Spread     (ft)
West Bridge Curbline
STA 12+71.00, 
15.00 LT 0.108 0.95 5 7.421 0.102 0.102 0.770 0.031 0.028 0.120 4.343 10.00
East Bridge Curbline
STA 12+14.00, 
15.00 RT 0.028 0.95 5 7.421 0.026 0.026 0.200 0.023 0.026 0.075 2.843 10.00
Inlet ID Inlet Station and Offset Area in Acres (A) Runoff Coeff.     (C) Time to Inlet                (min.) Rainfall Intensity    (in/hr) CA Total CA Catchment Rational Flow    (cfs) Grade of Gutter ft/ft (SL) Cross Slope Of Shoulde r ft/ft (Sx) Depth of Flow of Gutter     (ft) Gutter Flow Width       (ft) Allowable Spread     (ft)
West Bridge Curbline
STA 12+71.00, 
15.00 LT 0.108 0.95 5 8.93 0.102 0.102 0.920 0.031 0.028 0.128 4.643 10.00
East Bridge Curbline
STA 12+14.00, 
15.00 RT 0.028 0.95 5 8.93 0.026 0.026 0.240 0.023 0.026 0.080 3.044 10.00
East side of Simsbury Road
GUTTER FLOW ANALYSIS - 10 YR STORM
West side of Simsbury Road
East side of Simsbury Road
GUTTER FLOW ANALYSIS - 25 YR STORM
West side of Simsbury Road

Page 131

APPENDIX
F OPENROADS
HYDRUALIC
GRADE LINE
ANALYSIS

Page 132

FlexTable: CTDOT Catch Basin Table
Elevation 
(Invert Out)
(ft)
Elevation 
(Invert in 1)
(ft)
Hydraulic 
Grade Line 
(In)
(ft)
Energy Grade 
Line (In)
(ft)
Bypassed 
Rational Flow
(cfs)
Spread / 
Top Width
(ft)
Flow 
(Captured)
(cfs)
Total Rational 
Flow to Inlet
(cfs)
Elevation 
(Invert)
(ft)
Longitudinal 
Slope (Inlet)
(%)
Road Cross 
Slope
(%)
Elevation 
(Rim)
(ft)
Elevation 
(Ground)
(ft)
Clogging 
Factor
(%)
Inlet LocationInletLabel
308.00(N/A)308.44308.440.001.4440.080.08306.003.503.36311.10311.100.0On Grade"C" CB - Round - 6in Conc or Stone CurbCB-STA 16+36.00, 15.00' RT
307.83307.90308.29308.440.001.2771.131.13305.834.0020.00310.20310.200.0On Grade"C-L" CBCB-C-L-STA 16+31.00, 21.00 RT
307.13307.33307.71307.850.114.0310.270.38305.033.121.78310.83310.830.0On Grade"C" CB - Round - 6in Conc or Stone CurbeCB-STA 16+10.00, 44.00' RT
306.89307.04307.40307.560.135.0500.210.34305.292.941.19310.44310.440.0On Grade"C" CB - Round - 6in Conc or Stone CurbeCB-STA 15+85.00, 37.00' RT
Page 1 of 110/16/2025
C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw
10 yr

Page 133

FlexTable: CTDOT Catch Basin Table
Elevation 
(Invert Out)
(ft)
Elevation 
(Invert in 1)
(ft)
Hydraulic 
Grade Line 
(In)
(ft)
Energy Grade 
Line (In)
(ft)
Bypassed 
Rational Flow
(cfs)
Spread / 
Top Width
(ft)
Flow 
(Captured)
(cfs)
Total Rational 
Flow to Inlet
(cfs)
Elevation 
(Invert)
(ft)
Longitudinal 
Slope (Inlet)
(%)
Road Cross 
Slope
(%)
Elevation 
(Rim)
(ft)
Elevation 
(Ground)
(ft)
Clogging 
Factor
(%)
Inlet LocationInletLabel
308.00(N/A)308.51308.510.001.5480.090.09306.003.503.36311.10311.100.0On Grade"C" CB - Round - 6in Conc or Stone CurbCB-STA 16+36.00, 15.00' RT
307.83307.90308.33308.510.001.3711.371.37305.834.0020.00310.20310.200.0On Grade"C-L" CBCB-C-L-STA 16+31.00, 21.00 RT
307.13307.33307.77307.920.154.3220.310.46305.033.121.78310.83310.830.0On Grade"C" CB - Round - 6in Conc or Stone CurbeCB-STA 16+10.00, 44.00' RT
306.89307.04307.45307.630.175.4130.240.41305.292.941.19310.44310.440.0On Grade"C" CB - Round - 6in Conc or Stone CurbeCB-STA 15+85.00, 37.00' RT
Page 1 of 110/16/2025
C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw
25 yr

Page 134

FlexTable: CTDOT Conduit Table
Elevation 
Ground (Stop)
(ft)
Elevation 
Ground (Start)
(ft)
Hydraulic Grade 
Line (Out)
(ft)
Hydraulic Grade 
Line (In)
(ft)
Energy Grade 
Line (Out)
(ft)
Energy Grade 
Line (In)
(ft)
Velocity 
(Out)
(ft/s)
Velocity (In)
(ft/s)
Slope
(%)
Length 
(Unified)
(ft)
Flow
(cfs)
Diameter
(in)
Stop Invert
(ft)
Stop NodeStart Invert
(ft)
Start NodeLabel
316.50317.80314.32315.79314.92315.976.203.392.6549.0001.7218.0314.00EW-STA 17+89.00, 20.00' LT315.30L - EW- STA 18+16.00, 20.00' RTSW
310.20311.10308.44308.44308.44308.440.150.191.119.0000.0815.0307.90CB-C-L-STA 16+31.00, 21.00 RT308.00CB-STA 16+36.00, 15.00' RTSW1
310.83310.20307.79308.25307.88308.412.833.161.5233.0001.1615.0307.33eCB-STA 16+10.00, 44.00' RT307.83CB-C-L-STA 16+31.00, 21.00 RTSW4
310.44310.83307.50307.63307.61307.763.302.960.3923.0001.3415.0307.04eCB-STA 15+85.00, 37.00' RT307.13eCB-STA 16+10.00, 44.00' RTSW2
306.41310.44306.75307.34307.09307.504.693.221.4134.0001.4218.0306.41eRCCE-STA 15+53.00 43.00' RT306.89eCB-STA 15+85.00, 37.00' RTSW3
Page 1 of 110/16/2025
C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw
10 yr

Page 135

FlexTable: CTDOT Conduit Table
Elevation 
Ground (Stop)
(ft)
Elevation 
Ground (Start)
(ft)
Hydraulic Grade 
Line (Out)
(ft)
Hydraulic Grade 
Line (In)
(ft)
Energy Grade 
Line (Out)
(ft)
Energy Grade 
Line (In)
(ft)
Velocity 
(Out)
(ft/s)
Velocity (In)
(ft/s)
Slope
(%)
Length 
(Unified)
(ft)
Flow
(cfs)
Diameter
(in)
Stop Invert
(ft)
Stop NodeStart Invert
(ft)
Start NodeLabel
316.50317.80314.35315.84315.02316.046.553.592.6549.0002.0718.0314.00EW-STA 17+89.00, 20.00' LT315.30L - EW- STA 18+16.00, 20.00' RTSW
310.20311.10308.51308.51308.51308.510.150.191.119.0000.0915.0307.90CB-C-L-STA 16+31.00, 21.00 RT308.00CB-STA 16+36.00, 15.00' RTSW1
310.83310.20307.87308.30307.96308.472.793.341.5233.0001.4015.0307.33eCB-STA 16+10.00, 44.00' RT307.83CB-C-L-STA 16+31.00, 21.00 RTSW4
310.44310.83307.56307.68307.68307.833.343.120.3923.0001.6115.0307.04eCB-STA 15+85.00, 37.00' RT307.13eCB-STA 16+10.00, 44.00' RTSW2
306.41310.44306.78307.38307.16307.564.943.391.4134.0001.7018.0306.41eRCCE-STA 15+53.00 43.00' RT306.89eCB-STA 15+85.00, 37.00' RTSW3
Page 1 of 110/16/2025
C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw
25 yr

Page 136

Conduit FlexTable: CTDOT Storm Drain Computation Sheet
Elevation 
Ground 
(Stop)
(ft)
Elevation 
Ground 
(Start)
(ft)
Depth 
(Critical)
(ft)
Depth 
(Normal)
(ft)
Velocity
(ft/s)
Capacity 
(Full 
Flow)
(cfs)
Flow / 
Capacity 
(Design)
(%)
Slope 
(Constructi
on)
(%)
Slope 
(Calculate
d)
(%)
Invert 
(Stop)
(ft)
Invert 
(Start)
(ft)
Length 
(Unified)
(ft)
Manning's 
n
MaterialDiam
eter
(in)
Flow
(cfs)
System 
Rational 
Flow
(cfs)
Upstream 
Structure 
Flow (Total 
Surface)
(cfs)
System 
Intensity
(in/h)
System 
CA
(acres)
System 
Flow 
Time
(min)
Time 
(Pipe 
Flow)
(hours)
Upstre
am 
Inlet Tc
(hours)
Upstream 
Inlet Area
(acres)
Stop 
Node
Start 
Node
Label
316.50317.800.490.326.2017.1110.02.652.65314.00315.3049.0000.013Concrete18.01.721.721.722.9930.56928.0200.0020.4671.705
EW-
STA 
17+89.
00, 
20.00' 
LT
L - EW- 
STA 
18+16.0
0, 20.00' 
RT
SW
310.20311.100.110.091.846.811.11.881.11307.90308.009.0000.013Concrete15.00.080.080.087.4210.0104.9800.0010.0830.011
CB-C-L-
STA 
16+31.
00, 
21.00 
RT
CB-STA 
16+36.0
0, 15.00' 
RT
SW1
310.83310.200.420.324.637.9514.61.731.52307.33307.8333.0000.013Concrete15.01.161.161.133.0820.37427.0000.0020.4500.919
eCB-
STA 
16+10.
00, 
44.00' 
RT
CB-C-L-
STA 
16+31.0
0, 21.00 
RT
SW4
310.44310.830.460.502.964.0433.10.450.39307.04307.1323.0000.013Concrete15.01.341.340.383.0720.43227.1190.0020.2170.272
eCB-
STA 
15+85.
00, 
37.00' 
RT
eCB-STA 
16+10.0
0, 44.00' 
RT
SW2
306.41310.440.450.344.6912.4811.41.481.41306.41306.8934.0000.013Concrete18.01.421.420.343.0600.46127.2490.0020.0830.070
eRCCE-
STA 
15+53.
00 
43.00' 
RT
eCB-STA 
15+85.0
0, 37.00' 
RT
SW3
Page 1 of 110/16/2025
C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw
10 yr

Page 137

Conduit FlexTable: CTDOT Storm Drain Computation Sheet
Elevation 
Ground 
(Stop)
(ft)
Elevation 
Ground 
(Start)
(ft)
Depth 
(Critical)
(ft)
Depth 
(Normal)
(ft)
Velocity
(ft/s)
Capacity 
(Full 
Flow)
(cfs)
Flow / 
Capacity 
(Design)
(%)
Slope 
(Constructi
on)
(%)
Slope 
(Calculate
d)
(%)
Invert 
(Stop)
(ft)
Invert 
(Start)
(ft)
Length 
(Unified)
(ft)
Manning's 
n
MaterialDiam
eter
(in)
Flow
(cfs)
System 
Rational 
Flow
(cfs)
Upstream 
Structure 
Flow (Total 
Surface)
(cfs)
System 
Intensity
(in/h)
System 
CA
(acres)
System 
Flow 
Time
(min)
Time 
(Pipe 
Flow)
(hours)
Upstre
am 
Inlet Tc
(hours)
Upstream 
Inlet Area
(acres)
Stop 
Node
Start 
Node
Label
316.50317.800.540.356.5517.1112.12.652.65314.00315.3049.0000.013Concrete18.02.072.072.073.6160.56928.0200.0020.4671.705
EW-
STA 
17+89.
00, 
20.00' 
LT
L - EW- 
STA 
18+16.0
0, 20.00' 
RT
SW
310.20311.100.120.101.946.811.31.881.11307.90308.009.0000.013Concrete15.00.090.090.098.9300.0104.9800.0010.0830.011
CB-C-L-
STA 
16+31.
00, 
21.00 
RT
CB-STA 
16+36.0
0, 15.00' 
RT
SW1
310.83310.200.470.364.897.9517.71.731.52307.33307.8333.0000.013Concrete15.01.401.401.373.7220.37427.0000.0020.4500.919
eCB-
STA 
16+10.
00, 
44.00' 
RT
CB-C-L-
STA 
16+31.0
0, 21.00 
RT
SW4
310.44310.830.500.553.104.0439.80.450.39307.04307.1323.0000.013Concrete15.01.611.610.463.7100.43027.1130.0020.2170.272
eCB-
STA 
15+85.
00, 
37.00' 
RT
eCB-STA 
16+10.0
0, 44.00' 
RT
SW2
306.41310.440.490.374.9412.4813.61.481.41306.41306.8934.0000.013Concrete18.01.701.700.413.6970.45727.2360.0020.0830.070
eRCCE-
STA 
15+53.
00 
43.00' 
RT
eCB-STA 
15+85.0
0, 37.00' 
RT
SW3
Page 1 of 110/16/2025
C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw
25 yr

Page 138

FlexTable: CTDOT Headwall Table
Depth (Out)
(ft)
Depth (In)
(ft)
Energy Grade 
Line (Out)
(ft)
Hydraulic Grade 
Line (Out)
(ft)
Elevation 
(Invert)
(ft)
System Rational 
Flow
(cfs)
Flow (Total Out)
(cfs)
Boundary 
Condition Type
Y
(ft)
X
(ft)
MaterialSizeInlet DescriptionLabelID
0.490.49315.97315.79315.301.721.72Free Outfall904,176.31977,066.95<None><None>Concrete - Square edge w/headwall L - EW- STA 18+16.00, 20.00' RT459
0.320.32314.32314.32314.001.711.71Free Outfall904,151.52977,024.53<None><None>0° wingwall flaresEW-STA 17+89.00, 20.00' LT461
2.842.84306.75306.75303.911.421.42Free Outfall903,922.59977,108.50<None><None>0° wingwall flareseRCCE-STA 15+53.00 43.00' RT466
Page 1 of 110/16/2025
C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw
10 yr

Page 139

FlexTable: CTDOT Headwall Table
Depth (Out)
(ft)
Depth (In)
(ft)
Energy Grade 
Line (Out)
(ft)
Hydraulic Grade 
Line (Out)
(ft)
Elevation 
(Invert)
(ft)
System Rational 
Flow
(cfs)
Flow (Total Out)
(cfs)
Boundary 
Condition Type
Y
(ft)
X
(ft)
MaterialSizeInlet DescriptionLabelID
0.540.54316.04315.84315.302.072.07Free Outfall904,176.31977,066.95<None><None>Concrete - Square edge w/headwall L - EW- STA 18+16.00, 20.00' RT459
0.350.35314.35314.35314.002.072.07Free Outfall904,151.52977,024.53<None><None>0° wingwall flaresEW-STA 17+89.00, 20.00' LT461
2.872.87306.78306.78303.911.701.70Free Outfall903,922.59977,108.50<None><None>0° wingwall flareseRCCE-STA 15+53.00 43.00' RT466
Page 1 of 110/16/2025
C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw
25 yr

Page 140

Transition FlexTable: Bridge Curbline Flow Table
Transition 
Length
(ft)
Hydraulic Grade 
Line (Out)
(ft)
Depth (Out)
(ft)
Flow (Total Out)
(cfs)
Flow (Total In)
(cfs)
System CA
(acres)
System Drainage 
Area
(ft²)
Elevation 
(Invert)
(ft)
Elevation (Top)
(ft)
Elevation 
(Ground)
(ft)
LabelID
1.000(N/A)(N/A)0.200.200.0261,205.8289.52292.80292.80FE-STA 12+14.00, 15.00' RT488
1.000(N/A)(N/A)0.770.770.1024,690.8291.42294.70294.70FE-STA 12+71.00, 15.00' LT489
Page 1 of 110/16/2025
C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw
10 yr

Page 141

Transition FlexTable: Bridge Curbline Flow Table
Transition 
Length
(ft)
Hydraulic Grade 
Line (Out)
(ft)
Depth (Out)
(ft)
Flow (Total Out)
(cfs)
Flow (Total In)
(cfs)
System CA
(acres)
System Drainage 
Area
(ft²)
Elevation 
(Invert)
(ft)
Elevation (Top)
(ft)
Elevation 
(Ground)
(ft)
LabelID
1.000(N/A)(N/A)0.240.240.0261,205.8289.52292.80292.80FE-STA 12+14.00, 15.00' RT488
1.000(N/A)(N/A)0.920.920.1024,690.8291.42294.70294.70FE-STA 12+71.00, 15.00' LT489
Page 1 of 110/16/2025
C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw
25 yr

Page 142

Profile Report
Engineering Profile - L-EW-STA 18+16.00, 20.00 RT to EW-STA 17+89.00, 20.00 LT (HW_CB_0055-0145_Drainage Model_Rev -- Default.stsw)
310.00
315.00
320.00
-0+50 0+00 0+50
Station (ft)
Elevation (ft)
Element ID\Label
Length (Unified) (ft)
Rise (Unified) (ft)
Flow (cfs)
Slope (Calculated) (%)
Element ID\Label
Elevation (Ground) (ft)
Elevation (Invert) (ft)
Station (ft)
462\SW
49.000
1.50
1.72
2.65
462\SW
317.80 316.50
315.30 314.00
0+00 0+49
EW-STA 17+89.00, 20.00' LT
Ground: 316.50 ft
Invert: 314.00 ft
L - EW- STA 18+16.00, 20.00' RT
Ground: 317.80 ft
Invert: 315.30 ft
SW
49.000 ft @
 2.65 %
18"  Circle - Concrete Up Inv:315.30 ft Down Inv:314.00 ft
Page 1 of 110/16/2025
C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw
10 yr

Page 143

Profile Report
Engineering Profile - L-EW-STA 18+16.00, 20.00 RT to EW-STA 17+89.00, 20.00 LT (HW_CB_0055-0145_Drainage Model_Rev -- Default.stsw)
310.00
315.00
320.00
-0+50 0+00 0+50
Station (ft)
Elevation (ft)
Element ID\Label
Length (Unified) (ft)
Rise (Unified) (ft)
Flow (cfs)
Slope (Calculated) (%)
Element ID\Label
Elevation (Ground) (ft)
Elevation (Invert) (ft)
Station (ft)
462\SW
49.000
1.50
2.07
2.65
462\SW
317.80 316.50
315.30 314.00
0+00 0+49
EW-STA 17+89.00, 20.00' LT
Ground: 316.50 ft
Invert: 314.00 ft
L - EW- STA 18+16.00, 20.00' RT
Ground: 317.80 ft
Invert: 315.30 ft
SW
49.000 ft @
 2.65 %
18"  Circle - C
oncrete
Up Inv:315.30 ft 
Down Inv:314.00 ft
Page 1 of 110/16/2025
C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw
25 yr

Page 144

Profile Report
Engineering Profile - CB-STA 16+36.00, 15.00 RT to eRCCE-STA 15+53.00, 43.00 RT (HW_CB_0055-0145_Drainage Model_Rev -- Default.stsw)
300.00
305.00
310.00
315.00
-0+50 0+00 0+50 1+00
Station (ft)
Elevation (ft)
Element ID\Label
Length (Unified) (ft)
Rise (Unified) (ft)
Flow (cfs)
Slope (Calculated) (%)
Element ID\Label
Elevation (Ground) (ft)
Elevation (Invert) (ft)
Station (ft)
517\SW1518\SW4 468\SW2 469\SW3
9.000 33.000 23.000 34.000
1.25 1.25 1.25 1.50
0.08 1.16 1.34 1.42
1.11 1.52 0.39 1.41
517\SW1518\SW4 468\SW2 469\SW3
311.10310.20 310.83 310.44 306.41
306.00305.83 305.03 305.29 303.91
0+000+09 0+42 0+65 0+99
SW
3
34.000 ft @
 1.41 %
18"  Circle - Concrete U p Inv:306.89 ft Dow n Inv:306.41 ft
SW
2
23.000 ft @
 0.39 %
15"  Circle - Concrete Up Inv:307.13 ft D ow n Inv:307.04 ft
SW
4
33.000 ft @
 1.52 %
15"  Circle - Concrete Up Inv:307.83 ft Dow n Inv:307.33 ft
SW
1
9.000 ft @
 1.11 %
15"  Circle - Concrete Up Inv:308.00 ft Down Inv:307.90 ft
CB-C-L-STA 16+31.00, 21.00 RT
Rim: 310.20 ft
Invert: 305.83 ft
eCB-STA 15+85.00, 37.00' RT
Rim: 310.44 ft
Invert: 305.29 ft
eCB-STA 16+10.00, 44.00' RT
Rim: 310.83 ft
Invert: 305.03 ft
CB-STA 16+36.00, 15.00' RT
Rim: 311.10 ft
Invert: 306.00 ft
eRCCE-STA 15+53.00 43.00' RT
Invert: 303.91 ft
Page 1 of 110/16/2025
C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw
10 yr

Page 145

Profile Report
Engineering Profile - CB-STA 16+36.00, 15.00 RT to eRCCE-STA 15+53.00, 43.00 RT (HW_CB_0055-0145_Drainage Model_Rev -- Default.stsw)
300.00
305.00
310.00
315.00
-0+50 0+00 0+50 1+00
Station (ft)
Elevation (ft)
Element ID\Label
Length (Unified) (ft)
Rise (Unified) (ft)
Flow (cfs)
Slope (Calculated) (%)
Element ID\Label
Elevation (Ground) (ft)
Elevation (Invert) (ft)
Station (ft)
517\SW1518\SW4 468\SW2 469\SW3
9.000 33.000 23.000 34.000
1.25 1.25 1.25 1.50
0.09 1.40 1.61 1.70
1.11 1.52 0.39 1.41
517\SW1518\SW4 468\SW2 469\SW3
311.10310.20 310.83 310.44 306.41
306.00305.83 305.03 305.29 303.91
0+000+09 0+42 0+65 0+99
SW
3
34.000 ft @
 1.41 %
18"  Circle - Concrete U p Inv:306.89 ft Down Inv:306.41 ft
SW
2
23.000 ft @
 0.39 %
15"  Circle - Concrete Up Inv:307.13 ft Dow n Inv:307.04 ft
SW
4
33.000 ft @
 1.52 %
15"  Circle - Concrete Up Inv:307.83 ft Dow n Inv:307.33 ft
SW
1
9.000 ft @
 1.11 %
15"  Circle - C
oncrete
Up Inv:308.00 ft 
Down Inv:307.90 ft
CB-C-L-STA 16+31.00, 21.00 RT
Rim: 310.20 ft
Invert: 305.83 ft
eCB-STA 15+85.00, 37.00' RT
Rim: 310.44 ft
Invert: 305.29 ft
eCB-STA 16+10.00, 44.00' RT
Rim: 310.83 ft
Invert: 305.03 ft
CB-STA 16+36.00, 15.00' RT
Rim: 311.10 ft
Invert: 306.00 ft
eRCCE-STA 15+53.00 43.00' RT
Invert: 303.91 ft
Page 1 of 110/16/2025
C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw
25 yr

Page 146

APPENDIX
G CTDOT MS4
FORM

Page 147

Worksheet users should refer to the current CT DOT MS4 Project Design MEP Worksheet V4 Instructions  
Reference the CT DEEP Stormwater Quality Manual (SWQM) for design and the New England Stormwater Retrofit Manual for Crediting
CTDOT MS4 Design MEP Worksheet Version 4 Revised 2/15/2024 Page 1 of 3
CTDOT MS4 Project Design
Maximum Extent Practicable (MEP) Worksheet
Section 1: Project Information 
Project Number:
Title/Description:
Location:
Section 2: Existing Conditions
EC1 Total Project Area _________ acres
EC2 Pre-construction Total Impervious Area _________ acres
EC3 Pre-Construction Disconnected Impervious Area     _________ acres
EC4 Pre-construction DCIA for the Project (EC2 minus EC3)          acres ______% (EC4/EC1)
EC5 Soil Infiltration Potential Data Source: Existing Report / Soils Map Field Verified Good/Fair Poor Mixed
EC6 Depth to Maximum Groundwater TBD  to  ft below grade
EC7 Depth to Bedrock TBD  to  ft below grade
EC8 Aquifer Protection Area? (from PNDF) Yes No
EC9 MS4 Priority Area? (from PNDF) Yes (See Below) No
Check All That Apply         Urbanized Area             DCIA >11%           Impaired Waterbody (See Below) 
              Select All Impairments That Apply                                   
EC10 Contamination known or suspected to be present?  (From Environmental Compliance) Yes No
EC11 Adjoining DOT ROW beyond project limits available for stormwater quality management _____________ acres
NOTES: 
Town of Granby 2024 report documenting Granby’s efforts to comply with the conditions of the MS4
General Permit to the maximum extent practicable (MEP) is attached to this form.

Page 148

Worksheet users should refer to the current CT DOT MS4 Project Design MEP Worksheet V4 Instructions  
Reference the CT DEEP Stormwater Quality Manual (SWQM) for design and the New England Stormwater Retrofit Manual for Crediting
CTDOT MS4 Design MEP Worksheet Version 4 Revised 2/15/2024 Page 2 of 3
CTDOT MS4 Project Design 
Maximum Extent Practicable (MEP) Worksheet
Section 3: Designed Conditions
 Section 3A: Document Water Quality Volume (WQV) Retained and/or Treated (ac-ft)
Water Quality Volume Documentation 30% Design 60% Design 90% Design FDP
DC1 WQV design goal Full ½-WQV (Full = EC4 % < 40%) ac-ft  TBD ac-ft ac-ft ac-ft
DC2 WQV goal retained (refer to page 3) ac-ft ac-ft ac-ft ac-ft
DC3 WQV goal treated (refer to page 3) ac-ft ac-ft ac-ft ac-ft
Did the Project Retain and/or Treat the Entire WQV Goal?                Yes                      No
Section 3B:  Document Changes in Directly Connected Impervious Area (DCIA) Pre to Post Construction (acres)
DCIA Documentation 30% Design 60% Design 90% Design FDP
DC4 Post-construction Total Impervious Area ac. TBD ac. ac. ac.
DC5 Post-construction DCIA before new BMPs ac. TBD ac. ac. ac.
DC6 DCIA Disconnected by new BMPs (from Pg 3) ac. TBD ac. ac. ac.
DC7 Final Post-construction DCIA  (DC5 minus DC6) ac. TBD ac. ac. ac.
DC8 Pre-construction DCIA (refer to EC4 from Pg 1) ac. ac. ac. ac.
DC9
Change in DCIA from pre- to post-construction
(DC7 minus DC8) Can be positive (DCIA gained) or negative 
(DCIA lost)
ac.
TBD
ac. ac. ac.
Date completed
Completed by (initials)
Reviewed by (initials)
NOTES:

Page 149

* List the amount of the WQV the BMP is designed to retain or treat. 
** Refer to the CT DEEP Stormwater Quality Manual (SWQM) Stormwater Manual (ct.gov) and New England Stormwater Retrofit Manual Stormwater Retrofit Manual (snepnetwork.org) to determine 
disconnection and pollutant removal percentages. BMPs should be designed to meet specific TP, TN and TSS pollutant reductions to the maximum extent practicable when the entire WQV cannot be retained. 
Pollutant Reduction Targets are:  New Development TP 60%, TN 40%, TSS 90%. Redevelopment TP 50%, TN, 30% TSS 80%. (Page 48 of the SWQM)  
CTDOT MS4 Design MEP Worksheet Version 4 Revised 2/15/2024 Page 3 of 3
Section 4: Stormwater BMP Selection Summary
Design Phase
30% 60%     
90% FDP
BMP Type
WQV 
Retained*
(ac-ft)
WQV 
Treated* 
(ac-ft)
DCIA 
Captured 
by BMP 
(ac)
Runoff 
Depth from 
DCIA 
Captured by 
BMP (in)
HSG 
Soil 
Type 
DCIA 
Disconnection 
Credit (%)**
DCIA 
Disconnection 
Credit (ac)
 (TP) 
reduction 
%**
 (TSS) 
reduction 
%**
 (TN) 
reduction 
%*
BMP Category
TOTAL
To Row 
DC2
To Row 
DC3
To Row DC6
Describe Site Constraints Limiting BMP Implementation if applicable: 
Other Notes: 

Page 150

/0/1/2/3/4□/6/4/4/7/8/9/9□/10/7□/11/12/6/13/8
/14/15/16/17/15/18/19□/21/22/17/23/24/18□/25/26/27/28/26/26/29
/30
/31
□ /33/34/35/36□/38/39□/36/40/41□/42/43/44/45□/44/46/47□/48/35/38/49/35/34/50□/39/51/52/53/41/53□/54/55□/56/57□/58/43/43/33
/59/60/60□/28/61/27/62/63/29□/28/26/29/26/28/64/26/65
/66/67/68/69/70/71/72 /73/74/75/76/77/78□/80/81□/82/83/84□/77/85/76/77/86/76 /87/88/88/89□/91/88 /92/93/94/95/96□/97/94/93/94/98/91/99/88/100 /101/102/103/104/102/72/105
/106/68/70/104/107/108/109/68/102/104□/111/70/112/112/113/68/109/71/68
/70/103□/114/70/71/115/102/104/71
/116/107/67/109/69/104/107/102/71/68□/117/118/67/102 /114/109/113/72/102 /116/107/67/109/69/104/102/119□/120/102/72/69/121/71/109/68/102/119
/122/72/102
/123/111/124□/114/109/68/102/121/70/104/118 /117/125/120/126 /117/125/120/126/127/126/69/71/128 /129/109/68/102/104/130/70/119/118□/106/102/121/107/102/71/68
/116/120
/120/102/72/115/104/69/67/68/69/70/71 /129/109/68/102/104/130/70/119/118□/131/109/107/102 /125/69/112/102/72 /132/122/114□/133
/134/109/115/68/102/104/69/109 /117/125/120/126□/116/107/67/109/69/104/102/119 /123/72/115/105/102/104/69/115/105/69/109□/115/70/112/69 /101/102/115/104/102/109/68/69/70/71 /135/109 /114/117 □/106/68/109/68/102/108/69/119/102□/134/109/115/68/102/104/69/109
/117/125/120/126
/136/137/137/138/139/140/141/141/138/142/143/137/144/145/146/147/137/146/148/142/149/141/150/141 /151 /114/117/135/152/153/154/155/156/156/127/156/153/130 /114/70/71/103/112/113/102/71/115/102□/134/69/72/72/102/112/112
/134/104/70/70/128□/122/106□/70/103□/101/70/113/68/102
/153/156/157/158/156/158□/115/104/70/72/72/69/71/121/159□/122/106□/68/70
/132/129□/160/113/72/68□/122/106□/101/70/113/68/102□/153/161/154
/162/106/70/113/68/105□/101/70/109/119/163□/115/104/70/72/72/69/71/121/159
/132/109/104/68/112/109/71/119/164
/129/102/72/68□/134/104/109/71/115/105□/106/109/112/107/70/71
/134/104/70/70/128/127/156/153/130
/153/153/164/158/154 /156/153/156/133/156/158/156/161
/153□/103/102/109/68/113/104/102/72□/156□/72/102/112/102/115/68/102/119□
/158/156/158/156□/114/117□/106/68/70/104/107/108/109/68/102/104□/116/107/67/109/69/104/102/119□/101/69/166/102/104/72
 /167/168/167/168□/170/171□/172/173/174/175/176/177/178/173/179/175□/180/176/181/178/182/175/179/183□/184/178/185/179/186
 /167/168/167/168□/170/171□/172/173/174/175/176/177/178/173/179/175□/180/176/181/178/182/175/179/183□/187/186/173/188/178/175/182/179/186
 /170/171□/189/172/190□/171/174/177/191/186
/192/22□/193/194□/16/195
/196/197/196/197□/199/200/201/202/203/204/205/200/206/202□/207/203/208/205/209/202/206/210□/211/209/212/206/202/213□/214/206/215/200
/216/202/205/217/218/219□/199/205/220/203/201/217□/216/202/201/201/221/222/197/223/224
/225/91/88/96/89/226/95/91/94/96
/227/88/93/93/228/91/95/100/91□/88/229
/92/88/100/98/94/96/100
/230/95/98/91/94/96/99/95
/231/89/232/95/99/96/89/94/100/91
/233/234/232/94
/233/235/236/237□/231/89/232/95/99/96/94/238
/92/95/228/97/94 /239/97/98/240/94/96/99/98/240/99/95□/98/88/93/99
/231/89/232/95/99/96/94/238
/236/94/97/99/241/100/95/91/94/238
/242/97/94
/243/94/98/96/94/95/91/99/88/100
/239/227/244□/92/95/91/94/241/88/96/234 /245/95
/233/235/236/237 /92/233□/225/91/95/91/94/226/99/238/94□/230/95/98/91/94/96/99/95□/233/235/236/237
/233/235/236/237/246/237/99/100/247 /248/142/143/249□/251/252/253/142
/254/95/91/94/96/255/88/238/234□/231/236 /92/233/245 /0/1/2/3/4/4 /246/4/1 /255
/236/94/97/98/96/99/232/91/99/88/100 /92/88/100/229/93/228/94/100/98/94□/230/99/97/97/94/93/93□/230/96/88/88/247□/242/225
/88 /229□/243 /88/228/91/94 □/1/4/5 /6/4/6□/98/96/88/97/97/99/100/241 /7
/8/142/142/151□/137/142
/9/10/11/9/12/11/13/14/15□/9/13/17/14/18□/19/20 □/21/22/23/23/24/25/26/27/25/28/26□/20/29/12□/30/22/31/23/32□/33/23/34□/35/33/26/33
/36/26/26 /37/32/17/11/11/31/31/31/38/33/39/25 /40/27/32/38/25/22/41/11/33 /37/37 /32/11/31/24/42/33 /37/37 /43/27/24/31/24/39/11/27/23/34/24/44/38/36/26/41/45/46/27/34/47/34/25/42/25/14/42/48/48/10/24/18/49/12/25/33/42/42/33/18/10/50/33/34/24/25/13/13/49/18/18 /51/42/52□/35/33/26/33□/53 /37/37 /47 /9/11/9

Page 151

Impaired Segment Facts 
Impaired Segments:  
1. West Branch Salmon Brook 
(Segment 1a) (CT4319-00_01a) 
2. West Branch Salmon Brook 
(Segment 1b) (CT4319-00_01b) 
Municipalities: Hartland, Granby  
Impaired Segment Length (miles): 
4319-00_01a (1.4),  
4319-00_01b (11.29) 
Water Quality Classification:  
Class A 
Designated Use Impairment: 
Recreation 
Sub-regional Basin Name and 
Code: West Branch Salmon Brook, 
4319 
Regional Basin: Farmington 
Major Basin: Connecticut 
Watershed Area (acres): 17,019 
MS4 Applicable? Yes 
Applicable Season: Recreation 
Season (May 1 to September 30) 
Figure 1: Watershed location in 
Connecticut 
 
 
 
 
WATERSHED DESCRIPTION AND MAPS 
The West Branch Salmon Brook watershed covers an 
area of approximately 17,019 acres in the mid-northern 
half of Connecticut, west of the Connecticut River 
(Figure 1).  The watershed is located in Hartland, 
Simsbury, Barkhamsted, and Granby, CT. 
The West Branch Salmon Brook watershed includes two 
segments impaired for recreation due to elevated bacteria 
levels.  These segments were assessed by Connecticut 
Department of Energy and Environmental Protection (CT 
DEEP) and included in the CT 2010 303(d) List of 
Impaired Waters.  An excerpt of the Integrated Water 
Quality Report is included in Table 1 to show the status 
of other waterbodies in the watershed (CTDEEP, 2010).  
West Branch Salmon Brook begins upstream of the 
Route 179 crossing in Hartland, heads east following 
Route 20 (Hartland Road), turns south following 
Simsbury Road, crosses Barndoor Hills Road, turns north 
following Barndoor Hills Road, turns east to cross Route 
202 (10), and ends at the confluence with East Branch 
Salmon Brook in Granby.   
The bacteria impaired segment, West Branch Salmon 
Brook (Segment 1a) (CT4319-00_01a), consists of 1.4 
miles of river in Granby (Figure 2).  West Branch 
Salmon Brook (Segment 1a) begins at the confluence 
with Bissell Brook just upstream of the Route 202 (10) 
crossing, and ends at the confluence with East Branch 
Salmon Brook to the west of Route 189 in Granby.   
The bacteria impaired segment, West Branch Salmon 
Brook (Segment 1b) (CT4319-00_01b), consists of 11.29 
miles of the river in Hartland, and Granby (Figure 2).  
West Branch Salmon Brook (Segment 1b) begins 
upstream of the Route 179 crossing in Hartland, heads 
east following Route 20, turns south following Simsbury 
Road, crosses Barndoor Hills Roads, turns north 
following Barndoor Hills Road, and ends at the 
confluence with Bissell Brook just upstream of the Route 
202 (10) crossing in Granby. 
The two impaired segments of West Branch Salmon 
Brook have a water quality classification of A.  
West Branch Salmon Brook  
 
Watershed Summary 
 

Page 152

FINAL West Branch Salmon Brook Watershed Summary September 2012 
 
West Branch Salmon Brook Watershed TMDL 
Page 2 of 26 
 
Designated uses include potential drinking water supplies, habitat for fish and other aquatic life and 
wildlife, recreation, navigation, and industrial and agricultural water supply.  As there are no designated 
beaches in these segments of West Branch Salmon Brook, the specific recreation impairment is for non-
designated swimming and other water contact related activities.      
Table 1: Impaired segments and nearby waterbodies from the Connecticut 2010 Integrated Water 
Quality Report 
 Waterbody ID Waterbody Name Location Miles 
Aquatic Life 
Recreation 
Fish Consumption 
CT4319-
00_01a 
Salmon Brook, 
West Branch 
(Granby)-01a 
From mouth at confluence with East 
Branch Salmon Brook (part of Salmon 
Brook mainstem), DS of Route 10/202 
crossing, just to West of Route 189, 
Granby, US to Bissell Brook (just US of 
Route 10/202 crossing), Granby. 
1.4 FULL NOT FULL 
CT4319-
00_01b 
Salmon Brook, 
West Branch 
(Granby)-01b 
From confluence with Bissell Brook (US 
of Route 10/202 crossing), US to 
headwaters (just US of Route 179 (South 
Road) crossing), Hartland. 
11.29 FULL NOT FULL 
Shaded cells indicate impaired segment addressed in this TMDL 
FULL = Designated Use Fully Supported 
NOT = Designated Use Not Supported 
U = Unassessed 
 

Page 153

FINAL West Branch Salmon Brook Watershed Summary September 2012 
 
West Branch Salmon Brook Watershed TMDL 
Page 3 of 26 
 
Figure 2: GIS map featuring general information of the West Branch Salmon Brook watershed at 
the sub-regional level 
 

Page 154

FINAL West Branch Salmon Brook Watershed Summary September 2012 
 
West Branch Salmon Brook Watershed TMDL 
Page 4 of 26 
 
Land Use 
Existing land use can affect the water quality of waterbodies within a watershed (USEPA, 2011c). Natural 
processes, such as soil infiltration of stormwater and plant uptake of water and nutrients, can occur in 
undeveloped portions of the watershed.  As impervious surfaces (such as rooftops, roads, and sidewalks) 
increase within the watershed landscape from commercial, residential, and industrial development, the 
amount of stormwater runoff to waterbodies also increases.  These waterbodies are negatively affected as 
increased pollutants from nutrients and bacteria from failing and insufficient septic systems, oil and 
grease from automobiles, and sediment from construction activities become entrained in this runoff.  
Agricultural land use activities, such as fertilizer application and manure from livestock, can also increase 
pollutants in nearby waterbodies (USEPA, 2011c).     
As shown in Figures 3 and 4, the West Branch Salmon Brook watershed consists of 78% forest, 11% 
urban, 7% agriculture, and 4% water land uses.  The headwaters begin in a forested area with sporadic 
hayfields and rural residential development.  The stream skirts closely to Route 20 (Hartland Road) where 
residential development is more prominent.  Greater commercial and residential development intermixed 
with row crops and hayfields can be found along Simsbury Road and Barndoor Hills Road.  The stream 
flows near several identified livestock pens, a game refuge, and Salmon Brook Park, which consists of 7 
soccer fields, 5 baseball fields, tennis courts, parking lots, and a recreational swimming area.  
Downstream of the Route 202 (10) crossing, West Branch Salmon Brook flows between major row crop 
fields in suburban residential and commercial development.  
Figure 3: Land use within the West Branch Salmon Brook watershed 
 
7%
78%
4%
11%
Land Use (%) within the West Branch Salmon Brook 
Watershed
Agriculture
Forest
Urban
Water

Page 155

FINAL West Branch Salmon Brook Watershed Summary September 2012 
 
West Branch Salmon Brook Watershed TMDL 
Page 5 of 26 
 
Figure 4: GIS map featuring land use for the West Branch Salmon Brook watershed at the sub-
regional level
 

Page 156

FINAL West Branch Salmon Brook Watershed Summary September 2012 
 
West Branch Salmon Brook Watershed TMDL 
Page 6 of 26 
 
WHY IS A TMDL NEEDED? 
E. coli is the indicator bacteria used for comparison with the CT State criteria in the CT Water Quality 
Standards (WQS) (CTDEEP, 2011).  All data results are from CT DEEP, USGS, Bureau of Aquaculture, 
or volunteer monitoring efforts at stations located on the impaired segments. 
Table 2: Sampling station location description for impaired segments in the West Branch Salmon 
Brook watershed 
Waterbody ID Waterbody Name Station Station Description Municipality Latitude Longitude 
CT4319-00_01a West Branch Salmon Brook  2455 Rte.10 Bridge, McLean Game Refuge Granby 41.941107 -72.792581 
CT4319-00_01b West Branch Salmon Brook 1082 Salmon Brook Park Granby 41.943781 -72.795675 
CT4319-00_01b West Branch Salmon Brook  2456 footbridge McLean Game Refuge, Barn Door Hills Road   Granby 41.939272 -72.816897 
The two impaired segments of West Branch Salmon Brook (Segments 1a and 1b) are Class A freshwater 
rivers (Figure 5).  Their applicable designated uses are potential drinking water supplies, habitat for fish 
and other aquatic life and wildlife, recreation, navigation, and industrial and agricultural water supply.  
Water quality analyses were conducted using data from one sampling location on West Branch Salmon 
Brook (Segment 1a) (Station 2455) from 2007-2008, and from two sampling locations on West Branch 
Salmon Brook (Segment 1b) (Stations 1082 and 2456) from 2007-2009 (Table 2).  
For West Branch Salmon Brook (Segment 1a), the water quality criteria for E. coli, along with bacteria 
sampling results for Station 2455 from 2007-2008, are presented in Table 7.  The annual geometric mean 
was calculated for Station 2455 and exceeded the WQS for E. coli in both sampling years.  Single sample 
values at this station also exceeded the WQS for E. coli in 2007 and 2008 on at least one sampling date.   
For West Branch Salmon Brook (Segment 1b), the water quality criteria for E. coli, along with bacteria 
sampling results for Stations 1082 and 2456 from 2007-2009 are presented in Table 8.  The annual 
geometric mean was calculated and exceeded the WQS for E. coli in 2008.  Single sample values at 
Station 1082 also exceeded the WQS for E. coli in 2008 and 2009 on at least one sampling date.   
To aid in identifying possible bacteria sources, the geometric mean was also calculated for each station 
for wet-weather and dry-weather sampling days, where possible (Tables 7-8). For West Branch Salmon 
Brook (Segment 1a), geometric mean values during both wet and dry-weather at Station 2455 exceeded 
the WQS for E  coli, and wet weather values were higher than dry weather. For West Branch Salmon 
Brook (Segment 1b), at Station 1082 only the geometric mean during wet-weather exceeded the WQS for 
E. coli and was four times higher than in dry weather; while at station 2456 there was no wet weather 
data, so comparison was not possible.  
Due to the elevated bacteria measurements presented in Tables 7-8, these segments of West Branch 
Salmon Brook did not meet CT’s bacteria WQS, were identified as impaired, and were placed on the CT 
List of Waterbodies Not Meeting Water Quality Standards, also known as the CT 303(d) Impaired Waters 
List.  The Clean Water Act requires that all 303(d) listed waters undergo a TMDL assessment that 

Page 157

FINAL West Branch Salmon Brook Watershed Summary September 2012 
 
West Branch Salmon Brook Watershed TMDL 
Page 7 of 26 
 
describes the impairments and identifies the measures needed to restore water quality.  The goal is for all 
waterbodies to comply with State WQS.   
Figure 5: Aerial map of West Branch Salmon Brook 
 
 
 
 
 
 
 
 
 

Page 158

FINAL West Branch Salmon Brook Watershed Summary September 2012 
 
West Branch Salmon Brook Watershed TMDL 
Page 8 of 26 
 
POTENTIAL BACTERIA SOURCES 
Potential sources of indicator bacteria in a watershed include point and non-point sources, such as 
stormwater runoff, agriculture, sanitary sewer overflows (collection system failures), illicit discharges, 
and inappropriate discharges to the waterbody.  Potential sources that have been tentatively identified in 
the watershed based on land use (Figures 3 and 4) and a collection of local information for the impaired 
waterbody is presented in Table 3 and Figure 6.  However, the list of potential sources is general in nature 
and should not be considered comprehensive.  There may be other sources not listed here that contribute 
to the observed water quality impairment in the study segments.  Further monitoring and investigation 
will confirm listed sources and discover additional ones.  Some segments in this watershed may be listed 
as unassessed by CT DEEP procedures.  This does not suggest that there are no potential issues on this 
segment, but indicates a lack of current data to evaluate the segment as part of the assessment process.  
For some segments, there are data from permitted sources, and CT DEEP recommends that any elevated 
concentrations found from those permitted sources be addressed through voluntary reduction measures. 
More detailed evaluation of potential sources is expected to become available as activities are conducted 
to implement these TMDLs.  
Table 3: Potential bacteria sources in the West Branch Salmon Brook watershed 
Impaired 
Segment 
Permit 
Source 
Illicit 
Discharge 
CSO/SSO 
Issue 
Failing 
Septic 
System 
Agricultural 
Activity 
Stormwater 
Runoff 
Nuisance 
Wildlife/Pets Other 
West 
Branch 
Salmon 
Brook 
CT4319-
00_01a 
   x x x x  
West 
Branch 
Salmon 
Brook 
CT4319-
00_01b 
   x x x x  
 
 

Page 159

FINAL West Branch Salmon Brook Watershed Summary September 2012 
 
West Branch Salmon Brook Watershed TMDL 
Page 9 of 26 
 
Figure 6: Potential sources in the West Branch Salmon Brook watershed at the sub-regional level 
 

Page 160

FINAL West Branch Salmon Brook Watershed Summary September 2012 
 
West Branch Salmon Brook Watershed TMDL 
Page 10 of 26 
 
Point Sources 
Permitted sources within the watershed that could potentially contribute to the bacteria loading are 
identified in Table 4.  This table includes permit types that may or may not be present in the impaired 
watershed.  Future investigation and monitoring may reveal the presence of discharges in the watershed.  
Available effluent data from each of these permitted categories found within the watershed are compared 
to the CT State WQS for the appropriate receiving waterbody use and type.   
Table 4: General categories list of other permitted discharges 
Permit Code Permit Description Type Number in watershed 
CT Surface Water Discharges 0 
GPL Discharge of Swimming Pool Wastewater 0 
GSC Stormwater Discharge Associated with Commercial Activity 0 
GSI Stormwater Associated with Industrial Activity 0 
GSM Part B Municipal Stormwater MS4 0 
GSN Stormwater Registration – Construction 0 
LF Groundwater Permit (Landfill) 0 
UI Underground Injection 0 
Permitted Sources 
There is currently no permitted discharge information available for the West Branch Salmon Brook 
watershed.  Since the MS4 permits are not targeted to a specific location, but the geographic area of the 
regulated municipality, there is no one accurate location on the map to display the location of these 
permits.  One dot will be displayed at the geographic center of the municipality as a reference point.  
Sometimes this location falls outside of the targeted watershed and therefore the MS4 permit will not be 
displayed in the Potential Sources Map. Using the municipal border as a guideline will show which areas 
of an affected watershed are covered by an MS4 permit. 
Municipal Stormwater Permitted Sources 
Per the EPA Phase II Stormwater rule all municipal storm sewer systems (MS4s) operators located within 
US Census Bureau Urbanized Areas (UAs) must be covered under MS4 permits regulated by the 
appropriate State agency.  There is an EPA waiver process that municipalities can apply for to not 
participate in the MS4 program.  In Connecticut, EPA has granted such waivers to 19 municipalities.  All 
The potential sources map for the impaired basin was developed after thorough analysis of 
available data sets.  If information is not displayed in the map, then no sources were discovered 
during the analysis. The following is the list of potential sources that were evaluated: problems with 
migratory waterfowl, golf course locations, reservoirs, proposed and existing sewer service, cattle 
farms, poultry farms, permitted sources of bacteria loading (surface water discharge, MS4 permit, 
industrial stormwater, commercial stormwater, groundwater permits, and construction related 
stormwater), and leachate and discharge sources (agricultural waste, CSOs, failing septic systems, 
landfills, large septic tank leach fields, septage lagoons, sewage treatment plants, and water 
treatment or filter backwash).   

Page 161

FINAL West Branch Salmon Brook Watershed Summary September 2012 
 
West Branch Salmon Brook Watershed TMDL 
Page 11 of 26 
 
participating municipalities within UAs in Connecticut are currently regulated under MS4 permits by CT 
DEEP staff in the MS4 program. 
The US Census Bureau defines a UA as a densely settled area that has a census population of at least 
50,000. A UA generally consists of a geographic core of block groups or blocks that exceeds the 50,000 
people threshold and has a population density of at least 1,000 people per square mile. The UA will also 
include adjacent block groups and blocks with at least 500 people per square mile. A UA consists of all or 
part of one or more incorporated places and/or census designated places, and may include additional 
territory outside of any place.  (67 FR 11663)  
For the 2000 Census a new geographic entity was created to supplement the UA blocks of land.  This 
created a block known as an Urban Cluster (UC) and is slightly different than the UA.  The definition of a 
UC is a densely settled area that has a census population of 2,500 to 49,999. A UC generally consists of a 
geographic core of block groups or blocks that have a population density of at least 1,000 people per 
square mile, and adjacent block groups and blocks with at least 500 people per square mile. A UC 
consists of all or part of one or more incorporated places and/or census designated places;  such a place(s) 
together with adjacent territory;  or territory outside of any place.  The major difference is the total 
population cap of 49,999 people for a UC compared to >50,000 people for a UA.  (67 FR 11663) 
While it is possible that CT DEEP will be expanding the reach of the MS4 program to include UC 
municipalities in the near future they are not currently under the permit.  However, the GIS layers used to 
create the MS4 maps in this Statewide TMDL did include both UA and UC blocks. This factor creates 
some municipalities that appear to be within an MS4 program that are not currently regulated through an 
MS4 permit.  This oversight can explain a municipality that is at least partially shaded grey in the maps 
and there are no active MS4 reporting materials or information included in the appropriate appendix.  
While these areas are not technically in the MS4 permit program, they are still considered urban by the 
cluster definition above and are likely to contribute similar stormwater discharges to affected waterbodies 
covered in this TMDL. 
As previously noted, EPA can grant a waiver to a municipality to preclude their inclusion in the MS4 
permit program.  One reason a waiver could be granted is a municipality with a total population less than 
1000 people, even if the municipality was located in a UA.  There are 19 municipalities in Connecticut 
that have received waivers, this list is: Andover, Bozrah, Canterbury, Coventry, East Hampton, Franklin, 
Haddam, Killingworth, Litchfield, Lyme, New Hartford, Plainfield, Preston, Salem, Sherman, Sprague, 
Stafford, Washington, and Woodstock.  There will be no MS4 reporting documents from these towns 
even if they are displayed in an MS4 area in the maps of this document.  
The list of US Census UCs is defined by geographic regions and is named for those regions, not 
necessarily by following municipal borders. In Connecticut the list of UCs includes blocks in the 
following Census Bureau regions: Colchester, Danielson, Lake Pocotopaug, Plainfield, Stafford, Storrs, 
Torrington, Willimantic, Winsted, and the border area with Westerly, RI (67 FR 11663).  Any MS4 maps 
showing these municipalities may show grey areas that are not currently regulated by the CT DEEP MS4 
permit program. 
Segment 1a of West Branch Salmon Brook is located within the Town of Granby, CT.   Portions of the 
town particularly around Segment 1a are urbanized, as defined by the U.S. Census Bureau, and Granby is 
required to comply with the MS4 General Permit CT DEEP (Figure 7).  This general permit is only 
applicable to municipalities that are identified in Appendix A of the MS4 permit that contain designated 
urban areas and discharge stormwater via a separate storm sewer system to surface waters of the State.  

Page 162

FINAL West Branch Salmon Brook Watershed Summary September 2012 
 
West Branch Salmon Brook Watershed TMDL 
Page 12 of 26 
 
The permit requires municipalities to develop a Stormwater Management Plan (SMP) to reduce the 
discharge of pollutants and protect water quality.  The MS4 permit is discussed further in the “TMDL 
Implementation Guidance” section of the core TMDL document.  Additional information regarding 
stormwater management and the MS4 permit can be obtained on CTDEEP’s website  
(http://www.ct.gov/dep/cwp/view.asp?a=2721&q=325702&depNav_GID=1654). 
One MS4 outfall has been sampled for E. coli bacteria in the watershed (Table 5).  This outfall, located in 
Granby, was sampled from 2007-2009, and exceeded the single sample water quality standard of 410 
colonies/100 mL in 2008.   
Table 5: List of MS4 sample locations and E. coli (colonies/100 mL) results in the West Branch 
Salmon Brook watershed 
Town Location MS4 Type Receiving Waters Sample Date Result 
Granby Mill Pond C-2 Commercial Salmon Brook 10/19/07 50 
Granby Mill Pond C-2 Commercial Salmon Brook 09/26/08 5,080 
Granby Mill Pond C-2 Commercial Salmon Brook 11/14/09 50 
Shaded cells indicate an exceedance of single-sample based water quality criteria (410 colonies/100 mL) 
 

Page 163

FINAL West Branch Salmon Brook Watershed Summary September 2012 
 
West Branch Salmon Brook Watershed TMDL 
Page 13 of 26 
 
Figure 7: MS4 areas of the West Branch Salmon Brook watershed 
 

Page 164

FINAL West Branch Salmon Brook Watershed Summary September 2012 
 
West Branch Salmon Brook Watershed TMDL 
Page 14 of 26 
 
Non-point Sources 
Non-point source pollution (NPS) comes from many diffuse sources and is more difficult to identify and 
control. NPS pollution is often associated with land-use practices.  Examples of NPS that can contribute 
bacteria to surface waters include insufficient septic systems, pet and wildlife waste, agriculture, and 
contact recreation (swimming or wading).  Potential sources of NPS within the West Branch Salmon 
Brook watershed are described below.   
Agricultural Activities 
Agricultural operations are an important economic activity and landscape feature in many areas of the 
State.  Runoff from agricultural fields may contain pollutants such as bacteria and nutrients (USEPA, 
2011a).  This runoff can include pollutants from farm practices such as storing manure, allowing livestock 
to wade in nearby waterbodies, applying fertilizer, and reducing the width of vegetated buffer along the 
shoreline.  Agricultural land use makes up 7% of the West Branch Salmon Brook watershed, and the 
impaired segments of the West Branch Salmon Brook watershed flow through several agricultural 
corridors consisting of hayfields, row crops, and potential livestock pens, particularly along Simsbury 
Road, Barndoor Hills Road, and downstream of the Route 202 (10) crossing.   
Wildlife and Domestic Animal Waste 
Wildlife and domestic animals within the West Branch Salmon Brook watershed represent another 
potential source of bacteria.  Wildlife, including waterfowl, may be a significant bacteria source to surface 
waters.  With the construction of roads and drainage systems, these wastes may no longer be retained on 
the landscape, but instead may be conveyed via stormwater to the nearest surface water.  These physical 
land alterations can exacerbate the impact of these natural sources on water quality (USEPA, 2001).  The 
majority of the West Branch Salmon Brook watershed is undeveloped and wildlife waste may be a 
potential source of bacteria.  The impaired segments of West Branch Salmon Brook run through 
residential development along Route 20 and near the Route 202 (10) crossing, so pet waste may also be a 
potential source of bacteria.  
The impaired segments of West Branch Salmon Brook flow adjacent to agricultural fields, McLean Game 
Refuge, and Salmon Brook Park, which consists of 7 soccer fields, 5 baseball fields, tennis courts, parking 
lots, and a recreational swimming area.  Geese and other waterfowl are known to congregate in open areas 
including recreational fields, agricultural crop fields, and golf courses. In addition to creating a nuisance, 
large numbers of geese can create unsanitary conditions on the grassed areas and cause water quality 
problems due to bacterial contamination associated with their droppings. Large populations of geese can 
also lead to habitat destruction as a result of overgrazing on wetland and riparian plants.  
Stormwater Runoff from Developed Areas 
While the majority of the West Branch Salmon Brook watershed is forested (78%), approximately 11% of 
the land use in the watershed is urban, and the impaired segments of West Branch Salmon Brook flow 
near Route 20 and Route 202 (10), which are characterized by suburban residential and agricultural 
development (Figures 4 and 9).  Urban areas are often characterized by impervious cover, or surface areas 
such as roofs and roads that force water to run off land surfaces rather than infiltrate into the soil.  Studies 
have shown a link between increasing impervious cover and degrading water quality conditions in a 
watershed (CWP, 2003).  In one study, researchers correlated the amount of fecal coliform to the percent 
of impervious cover in a watershed (Mallin et al., 2000).   

Page 165

FINAL West Branch Salmon Brook Watershed Summary September 2012 
 
West Branch Salmon Brook Watershed TMDL 
Page 15 of 26 
 
As shown in Figures 8 and 9, 98% of the West Branch Salmon Brook watershed contains less than 6% 
impervious cover, particularly along Segment 1b, and Segment 1a flows through an area characterized by 
7-11% impervious cover.  As indicated above, Segment 1b and Segment 1a flow through several urban-
agriculture corridors with commercial and residential development along Route 20 and Route 202 (10); 
therefore, stormwater runoff pollution from adjacent urban development may be a higher contributor of 
bacterial contamination than the summarized statistics for land use and impervious cover reveal.  Water 
quality data taken at Stations 2455 and 1082 along West Branch Salmon Brook exceeded wet-weather 
geometric mean limits, which suggests that stormwater runoff may be a source of bacteria to West Branch 
Salmon Brook (Tables 7-8).  
Figure 8: Range of impervious cover (%) in the West Branch Salmon Brook watershed 
 
 
 
98%
2%
Impervious Cover in the West Branch Salmon Brook 
Watershed 
0 - 6%
7 - 11%
12 - 15%
> 16%

Page 166

FINAL West Branch Salmon Brook Watershed Summary September 2012 
 
West Branch Salmon Brook Watershed TMDL 
Page 16 of 26 
 
Figure 9: Impervious cover (%) for the West Branch Salmon Brook sub-regional watershed
 

Page 167

FINAL West Branch Salmon Brook Watershed Summary September 2012 
 
West Branch Salmon Brook Watershed TMDL 
Page 17 of 26 
 
Insufficient Septic Systems and Illicit Discharges 
As shown in Figure 6, the entire West Branch Salmon Brook watershed relies on onsite wastewater 
treatment systems, such as septic systems.  Insufficient or failing septic systems can be significant sources 
of bacteria by allowing raw waste to reach surface waters.  West Branch Salmon Brook (Segment 1a) at 
Station 2455 exceeded the dry-weather geometric mean limit for E. coli, which may indicate nearby 
failing septic systems.  In Connecticut, local health directors or health districts are responsible for keeping 
track of any reported insufficient or failing septic systems in a specific municipality.  The Towns of 
Hartland and Granby are part of the Farmington Valley Health District (http://www.fvhd.org/).  
There is only a very small area near the southern border of the West Branch Salmon Brook watershed that 
is serviced by the municipal sewer system (Figure 6).  Given the very small size of this area, and the large 
distance from the impaired stream segments, sewer system leaks and other illicit discharges are not 
considered a potential source of bacteria in the watershed.   
Additional Sources 
As identified in Figure 6, a landfill is located along a tributary to Segment 1b, but is not considered a 
significant source of bacterial contamination to West Branch Salmon Brook given the distance from the 
impaired stream. There may be other sources not listed here or identified in Figure 6 that contribute to the 
observed water quality impairment in West Branch Salmon Brook.  Further monitoring and investigation 
will confirm the listed sources and discover additional ones.  More detailed evaluation of potential sources 
is expected to become available as activities are conducted to implement this TMDL. 
Land Use/Landscape 
Riparian Buffer Zones 
The riparian buffer zone is the area of land located immediately adjacent to streams, lakes, or other 
surface waters.  The boundary of the riparian zone and the adjoining uplands is gradual and not always 
well-defined.  However, riparian zones differ from uplands because of high levels of soil moisture, 
frequent flooding, and the unique assemblage of plant and animal communities found there.  Through the 
interaction of their soils, hydrology, and vegetation, natural riparian areas influence water quality as 
contaminants are taken up into plant tissues, adsorbed onto soil particles, or modified by soil organisms.  
Any change to the natural riparian buffer zone can reduce the effectiveness of the natural buffer and has 
the potential to contribute to water quality impairment (USEPA, 2011b). 
The CLEAR program at UCONN has created streamside buffer layers for the entire State of Connecticut 
(http://clear.uconn.edu/), which have been used in this TMDL.  Analyzing this information can reveal 
potential sources and implementation opportunities at a localized level.  The land use directly adjacent to 
a waterbody can have direct impacts on water quality from surface runoff sources. 
The riparian zone for West Branch Salmon Brook (Segment 1a) is characterized by mixed forest with 
agricultural and developed land uses (Figure 10).  Riparian areas along West Branch Salmon Brook 
(Segment 1b) are characterized by mixed forest with agricultural, turf-grass, and developed land uses.  As 
previously noted, if not properly treated, runoff from agricultural and developed areas may contain 
pollutants such as bacteria and nutrients.    

Page 168

FINAL West Branch Salmon Brook Watershed Summary September 2012 
 
West Branch Salmon Brook Watershed TMDL 
Page 18 of 26 
 
Figure 10: Riparian buffer zone information for the West Branch Salmon Brook watershed 
 
UCONN CLEAR:  http://clear.uconn.edu/  

Page 169

FINAL West Branch Salmon Brook Watershed Summary September 2012 
 
West Branch Salmon Brook Watershed TMDL 
Page 19 of 26 
 
CURRENT MANAGEMENT ACTIVITIES 
As indicated previously, Granby is regulated under the MS4 program.  The MS4 General Permit is 
required for any municipality with urbanized areas that initiates, creates, originates or maintains any 
discharge of stormwater from a storm sewer system to waters of the State.  The MS4 permit requires 
towns to design a Stormwater Management Plan (SMP) to reduce the discharge of pollutants in 
stormwater to improve water quality.  The plan must address the following 6 minimum measures: 
 
1. Public Education and Outreach. 
2. Public Involvement/Participation. 
3. Illicit discharge detection and elimination. 
4. Construction site stormwater runoff control. 
5. Post-construction stormwater management in new development and redevelopment. 
6. Pollution prevention/good housekeeping for municipal operations. 
Each town is also required to submit an annual update outlining the steps they are taking to meet the six 
minimum measures.  All updates that address bacterial contamination in the watershed are summarized in 
Table 6.   
Table 6: Summary of MS4 requirement updates related to the reduction of bacterial contamination 
from Granby, CT (Permit # GSM000029) 
Minimum Measure Town of Granby Annual Report (2008) 
Public Outreach and Education 1) Modified stormwater pollution section on website. 
Public Involvement and Participation No updates. 
Illicit Discharge Detection and 
Elimination 
1) Completed mapping of all storm sewer outfalls. 
2) Will adopt illicit discharge detection and elimination ordinance. 
Construction Site Stormwater Runoff 
Control 
1) Continuing to review existing regulations regarding runoff and 
erosion control. 
Post Construction Stormwater 
Management No updates. 
Pollution Prevention and Good 
Housekeeping 
1) Developing a program to evaluate and clean stormwater structures 
for upgrades and necessary repairs. 
 

Page 170

FINAL West Branch Salmon Brook Watershed Summary September 2012 
 
West Branch Salmon Brook Watershed TMDL 
Page 20 of 26 
 
RECOMMENDED NEXT STEPS 
The Towns of Hartland and Granby have developed and implemented programs to protect water quality 
from bacterial contamination.  Several municipalities have worked with the Farmington River Watershed 
Association (FRWA) www.frwa.org  to develop and implement programs to protect water quality from 
bacterial contamination. Any municipalities not already working with this watershed association are 
encouraged to contact them for assistance with future efforts dealing with bacteria impairment in the West 
Branch Brook Watershed, a tributary of the Farmington River. Future mitigative activities are necessary 
to ensure the long-term protection of West Branch Salmon Brook and have been prioritized below.  
1) Ensure there are sufficient buffers on agricultural lands along West Branch Salmon Brook. 
Agricultural land use represents 7% of the West Branch Salmon Brook watershed, and is particularly 
concentrated around the impaired segments of West Branch Salmon Brook along Simsbury Road, 
Barndoor Hills Road, and downstream of the Route 202 (10) crossing.  Potential livestock pens along 
West Branch Salmon Brook may be a concern for water quality.  If not already in place, agricultural 
producers should work with the CT Department of Agriculture and the U.S. Department of Agriculture 
Natural Resources Conservation Service to develop conservation plans for their farming activities within 
the watershed.  These plans should focus on ensuring that there are sufficient stream buffers, that fencing 
exists to restrict livestock and horse access from streams and wetlands, and that animal waste handling, 
disposal, and other appropriate BMPs are in place.  
2) Evaluate municipal education and outreach programs regarding animal waste. 
As most of the West Branch Salmon Brook watershed is forested with developed residential and 
agricultural areas along Route 20, Simsbury Road, Barndoor Hills Road, and Route 202 (10) adjacent to 
the impaired segments, any education and outreach program should highlight the importance of managing 
waste from horses, dogs, and other pets and not feeding waterfowl and wildlife.  The municipalities and 
residents can take measures to minimize waterfowl-related impacts such as allowing tall, coarse 
vegetation to grow in the riparian areas of West Branch Salmon Brook that are frequented by waterfowl.  
Waterfowl, especially grazers like geese, prefer easy access to water.  Maintaining an uncut vegetated 
buffer along the shore will make the habitat less desirable to geese and encourage migration.  In addition, 
any educational program should emphasize that feeding waterfowl, such as ducks, geese, and swans, may 
contribute to water quality impairments in West Branch Salmon Brook and can harm human health and 
the environment.  Animal wastes should be disposed of away from any waterbody or storm drain system.  
BMPs effective at reducing the impact of animal waste on water quality include installing signage, 
providing pet waste receptacles in high-use areas, enacting ordinances requiring the clean-up of pet waste, 
and targeting educational and outreach programs in problem areas. 
3) Identify areas along the West Branch Salmon Brook to implement Best Management Practices 
(BMPs) to control stormwater runoff. 
As noted previously, 11% of the West Branch Salmon Brook watershed is considered urban, particularly 
near the impaired segments of West Branch Salmon Brook along Route 20 and Route 202 (10), and 
Stations 2455 and 1082 along both impaired segments exceeded wet-weather geometric mean limits.  As 
such, stormwater runoff is likely contributing bacteria to the waterbodies.  It may be beneficial to 
investigate the impact that Salmon Brook Park has on the adjacent West Branch Salmon Brook (Segment 
1b).  To identify other areas that are contributing bacteria to the impaired segments, the municipalities 
should conduct wet-weather sampling at any stormwater outfalls that discharge directly to the impaired 

Page 171

FINAL West Branch Salmon Brook Watershed Summary September 2012 
 
West Branch Salmon Brook Watershed TMDL 
Page 21 of 26 
 
segments in the West Branch Salmon Brook watershed.  To treat stormwater runoff, the municipalities 
should identify areas along the impaired segment to install BMPs designed to encourage stormwater to 
infiltrate into the ground before entering the waterbodies.  These BMPs would disconnect impervious 
areas and reduce pollutant loads to the river.  More detailed information and BMP recommendations can 
be found in the core TMDL document.  
4) Develop a system to monitor septic systems. 
The entire West Branch Salmon Brook watershed relies on septic systems, and a geometric mean 
exceedance during dry-weather at Station 2455 along West Branch Salmon Brook (Segment 1a) may 
indicate nearby failing septic systems.  If not already in place, Hartland and Granby should establish 
programs to ensure that existing septic systems are properly operated and maintained, and create an 
inventory of existing septic systems through mandatory inspections.  Inspections help encourage proper 
maintenance and identify failed and sub-standard systems.  Policies that govern the eventual replacement 
of sub-standard systems within a reasonable timeframe can be adopted.  The municipalities should also 
develop a program to assist citizens with the replacement and repair of older and failing systems.  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Page 172

FINAL West Branch Salmon Brook Watershed Summary September 2012 
 
West Branch Salmon Brook Watershed TMDL 
Page 22 of 26 
 
BACTERIA DATA AND PERCENT REDUCTIONS TO MEET THE TMDL 
Table 7: West Branch Salmon Brook Bacteria Data        
Waterbody ID: CT4319-00_01a 
Characteristics:  Freshwater, Class A, Potential Drinking Water Supplies, Habitat for Fish and other 
Aquatic Life and Wildlife, Recreation, Navigation, and Industrial and Agricultural Water Supply 
Impairment: Recreation (E. coli bacteria) 
Water Quality Criteria for E. coli: 
 Geometric Mean: 126 colonies/100 mL 
 Single Sample: 410 colonies/100 mL 
Percent Reduction to meet TMDL: 
 Geometric Mean:  65% 
 Single Sample: 79% 
Data: 2007-2008 from CT DEEP targeted sampling efforts, 2012 TMDL Cycle  
Single sample E. coli (colonies/100 mL) data from Station 2455 on West Branch Salmon Brook 
(Segment 1a) with annual geometric mean calculated 
Station 
Name Station Location Date Results Wet/Dry Geomean 
2455 DS of Route 10 bridge at McLean Game Refuge 6/4/2007 1986* (79%) wet 
364* 
(65%) 
2455 DS of Route 10 bridge at McLean Game Refuge 6/18/2007 133 dry 
2455 DS of Route 10 bridge at McLean Game Refuge 7/2/2007 187 dry 
2455 DS of Route 10 bridge at McLean Game Refuge 7/16/2007 383 dry 
2455 DS of Route 10 bridge at McLean Game Refuge 8/13/2007 135 dry 
2455 DS of Route 10 bridge at McLean Game Refuge 8/27/2007 1664 dry 
2455 DS of Route 10 bridge at McLean Game Refuge 9/10/2007 771 dry 
2455 DS of Route 10 bridge at McLean Game Refuge 9/17/2007 146 dry 
2455 DS of Route 10 bridge at McLean Game Refuge 9/24/2007 169 dry 
2455 DS of Route 10 bridge at McLean Game Refuge 10/1/2007 512 dry 
 
 
 

Page 173

FINAL West Branch Salmon Brook Watershed Summary September 2012 
 
West Branch Salmon Brook Watershed TMDL 
Page 23 of 26 
 
Single sample E. coli (colonies/100 mL) data from Station 2455 on West Branch Salmon Brook 
(Segment 1a) with annual geometric mean calculated (continued) 
Station 
Name Station Location Date Results Wet/Dry Geomean 
2455 DS of Route 10 bridge at McLean Game Refuge 6/9/2008 199 wet 
259 
2455 DS of Route 10 bridge at McLean Game Refuge 6/23/2008 563 wet 
2455 DS of Route 10 bridge at McLean Game Refuge 7/7/2008 318 dry 
2455 DS of Route 10 bridge at McLean Game Refuge 7/21/2008 241 wet 
2455 DS of Route 10 bridge at McLean Game Refuge 8/4/2008 262 dry 
2455 DS of Route 10 bridge at McLean Game Refuge 8/18/2008 135 dry 
Shaded cells indicate an exceedance of water quality criteria 
*Indicates single sample and geometric mean  values used to calculate the percent reduction 
Wet and dry weather geometric mean values for Station 2455 on West Branch Salmon Brook 
(Segment 1a) 
Station 
Name Station Location Years Sampled Number of Samples Geometric Mean Wet Dry All Wet Dry 
2455 DS of Route 10 bridge at McLean Game Refuge 2007-2008 4 12 321 481 280 
Shaded cells indicate an exceedance of water quality criteria 
Weather condition determined from rain gage at the Hartford Bradley International Airport 
 
 
 
 
 
 
 
 
 
 
 
 

Page 174

FINAL West Branch Salmon Brook Watershed Summary September 2012 
 
West Branch Salmon Brook Watershed TMDL 
Page 24 of 26 
 
Table 8: West Branch Salmon Brook Bacteria Data        
Waterbody ID: CT4319-00_01b 
Characteristics:  Freshwater, Class A, Potential Drinking Water Supplies, Habitat for Fish and other 
Aquatic Life and Wildlife, Recreation, Navigation, and Industrial and Agricultural Water Supply 
Impairment: Recreation (E. coli bacteria) 
Water Quality Criteria for E. coli: 
 Geometric Mean: 126 colonies/100 mL 
 Single Sample: 410 colonies/100 mL 
Percent Reduction to meet TMDL: 
 Geometric Mean:  28% 
 Single Sample: 60% 
Data: 2007-2009 from CT DEEP targeted sampling efforts, 2012 TMDL Cycle  
Single sample E. coli (colonies/100 mL) data from Stations 1082 and 2456 on West Branch Salmon 
Brook (Segment 1b) with annual geometric mean calculated  
Station 
Name Station Location Date Results Wet/ Dry Geomean 
1082 Adjacent to Salmon Brook Park 6/9/2008 908 wet 
174* 
(28%) 
1082 Adjacent to Salmon Brook Park 6/23/2008 134 wet 
1082 Adjacent to Salmon Brook Park 7/7/2008 63 dry 
1082 Adjacent to Salmon Brook Park 7/21/2008 295 wet 
1082 Adjacent to Salmon Brook Park 8/4/2008 144 dry 
1082 Adjacent to Salmon Brook Park 8/18/2008 86 dry 
1082 Adjacent to Salmon Brook Park 6/1/2009 30 dry 
99 
1082 Adjacent to Salmon Brook Park 6/15/2009 218 wet 
1082 Adjacent to Salmon Brook Park 6/29/2009 31 dry 
1082 Adjacent to Salmon Brook Park 7/13/2009 62 dry 
1082 Adjacent to Salmon Brook Park 7/27/2009 74 wet 
1082 Adjacent to Salmon Brook Park 8/10/2009 97 dry 
1082 Adjacent to Salmon Brook Park 8/24/2009 1025* (60%) wet 
 
 

Page 175

FINAL West Branch Salmon Brook Watershed Summary September 2012 
 
West Branch Salmon Brook Watershed TMDL 
Page 25 of 26 
 
Single sample E. coli (colonies/100 mL) data from Stations 1082 and 2456 on West Branch Salmon 
Brook (Segment 1b) with annual geometric mean calculated (continued) 
Station 
Name Station Location Date Results Wet/ Dry Geomean 
2456 Upstream of Barn Door Hills Road footbridge at McLean Game Refuge 9/10/2007 98 dry 
65 
2456 Upstream of Barn Door Hills Road footbridge at McLean Game Refuge 9/17/2007 86 dry 
2456 Upstream of Barn Door Hills Road footbridge at McLean Game Refuge 9/24/2007 41 dry 
2456 Upstream of Barn Door Hills Road footbridge at McLean Game Refuge 10/1/2007 52 dry 
Shaded cells indicate an exceedance of water quality criteria 
*Indicates single sample and geometric mean  values used to calculate the percent reduction 
Wet and dry weather geometric mean values for Stations 1082 and 2456 on West Branch Salmon 
Brook (Segment 1b) 
Station 
Name Station Location Years Sampled Number of Samples Geometric Mean Wet Dry All Wet Dry 
1082 Adjacent to Salmon Brook Park 2008-2009 6 7 128 290 64 
2456 Upstream of Barn Door Hills Road footbridge at McLean Game Refuge 2007 0 4 65 NA 65 
Shaded cells indicate an exceedance of water quality criteria 
Weather condition determined from rain gage at the Hartford Bradley International Airport 
 
 
 
 
 
 
 
 
 
 
 
 

Page 176

FINAL West Branch Salmon Brook Watershed Summary September 2012 
 
West Branch Salmon Brook Watershed TMDL 
Page 26 of 26 
 
REFERENCES 
Costa, Joe (2011). Calculating Geometric Means. Buzzards Bay National Estuary Program. Online: 
 http://www.buzzardsbay.org/geomean.htm 
CTDEEP (2010). State of Connecticut Integrated Water Quality Report. Online: 
http://www.ct.gov/dep/lib/dep/water/water_quality_management/305b/ctiwqr10final.pdf 
CTDEEP (2011). State of Connecticut Water Quality Standards. Online: 
 http://www.ct.gov/dep/lib/dep/water/water_quality_standards/wqs_final_adopted_2_25_1 1.pdf 
CWP (2003). Impacts of Impervious Cover on Aquatic Systems. Center for Watershed  Protection. 
 Online: http://clear.uconn.edu/projects/tmdl/library/papers/Schueler_2003.pdf 
Federal Register 67 (March 15, 2002) 11663-11670. Urban Area Criteria for Census 2000.  
Mallin, M.A., K.E. Williams, E.C. Escham, R.P. Lowe (2000). Effect of Human Development on  
            Bacteriological Water Quality in Coastal Wetlands.  Ecological Applications 10: 1047-        
            1056. 
USEPA (2001). Managing Pet and Wildlife Waste to Prevent Contamination of Drinking  Water.  Online: 
 http://www.epa.gov/safewater/sourcewater/pubs/fs_swpp_petwaste.pdf. 
USEPA (2011a). Managing Nonpoint Source Pollution from Agriculture. Online: 
 http://water.epa.gov/polwaste/nps/outreach/point6.cfm 
USEPA (2011b). Riparian Zone and Stream Restoration. Online:  http://epa.gov/ada/eco/riparian.html 
USEPA (2011c). Land Use Impacts on Water. Online: http://epa.gov/greenkit/toolwq.htm 
 

Page 177

 
MS4
 ANNU
AL REPORT 
TOWN
 OF GRANBY 
JANUARY – DECEMBER 2024 
P
REPARED BY: 
A
tlas 
290 R
oberts Street-S
uite 301 
E
ast Hartford, Connecticut 06108 March 25, 2025

Page 178

 
 
Page
 | 
i 
TABLE OF 
CONTENTS
 
TOWN OF GRANBY 202
4 ANNUAL REPORT………………………………………….1 
FIGURES 
 
Figure 1 – 
MS4 System Map
 
Figure 2 – 
Priority Outfalls Map
 
Figure 3 – 
Impaired Waters by Catchment Map
 
Figure 4 – 
Urbanized Areas by Catchment Map
 
Figure 5 – Prioritized Retrofitting by Catchment Map  
Figure 6 – 
Catchment Priority Rankings
 
Map
 
APPENDICES
 
 
Septic Repair and Replacment 
 
 
Wet Weather Sampling 
Oufalls to Impaired Waterbodies 
 
 
Dry Weather Inspections 
 
 
Dry Weather Inspections 
Illicit Discharge Sampling Results 
  
 
Catchment Assessment and Prioirty Ranking Matrix
  
 
 
 
 

Page 179

1
 
MS4 
Gen
eral Permit
 
Town of 
Granby
 
202
4 
Annual Report
 
Permit Number GSM 
000029
 
January 1, 
2024 
– 
December 31, 
2024
 
Primary MS4 Contact:
 
Kirk Severance
, 
Director of Public Works, 
kseverance@granby
-ct.gov
 
This report documents 
Granby’s
 efforts to comply with the conditions of the MS4 General Permit to the maximum extent practicable (MEP) from January 1, 
2024 
to December 31, 
2024. 
Par
t I: Sum
mary of Minimum Control Measure Acti
vities 
1. Public Education and Outreach
 
(
Section 6 
(a
)(1)
 
/ page 
19
)
1.1
 
BMP Summary
 
BMP 
Activities in current 
reporting period
 
Sources Used 
(if applicable)
 
Method of 
Distribution
 
Audience (and 
number of 
people reached)
 
Measurable Goal
 
Department / 
Person 
Responsible
 
Additional details
 
1
-
1
Implement
public
education
and
outreach
The Town has linked 
educational materials to its
 
Stormwater Management 
page, 
including
 
fact sheets 
pertaining to animal waste 
and water quality, lawn 
care, septic system care, 
pest management and 
biological controls, and 
managing household 
chemicals.
 
 
Town 
Website and 
NEMO 
website. 
Electronically
 
~1
1
,
2
00 Town 
Residents
 
Raise awareness that 
polluted stormwater 
runoff is the most 
significant source of 
water quality 
problems. 
 
Department of 
Public Works/ 
Kirk A. 
Severance, 
Director of 
Public Works
 
Stormwater Management
 
CT NEMO 
1
-
2
Address
education/
outreach
for
pollutants
of concern
I
n 2020, t
he 
West Salmon 
Brook was identified 
as an 
impaired waterbody
 
by 
bacteria (E. coli). 
Educational materials 
tailored and targeted to 
educate the sources of 
bacteria were provided 
online. These included 
Town 
Website
 
Electronically 
and brochures
 
~1
1
,
2
00 Town 
Residents
 
Educate 
the public 
about the possible 
sources, impacts, and 
pollution reduction 
practices of bacteria. 
 
Department of 
Public Works/ 
Kirk A. 
Severance, 
Director of 
Public Works
 
FVHD
 
Pet Waste and Water Quality
 

Page 180

 
2
 
 
1.2 
Describe any Public Education and Outreach activities planned for the next year, if applicable.
 
1. The Town of Granby will continue to raise awareness and 
motivate resident to use Best Management Practices to reduce Storwmater runoff. This will include publishing 
tailored and targeted information regarding the 2024 Impaired Water Quality Report 303(d) when it is published.
 
2. The fact sheets are reviewed every year for their relevance to the Town of Granby and updated if new best management practices have been identified
. 
 
2. 
Public Involvement/
Participation
 
(Section 6(a)(2) 
/ page 21
)
 
 
2.1 BMP Summary
 
BMP 
Status 
(Complete, Ongoing, In 
Progress, or Not 
started)
 
Activities in 
current 
reporting 
period
 
Measurable 
Goal
 
Department / 
Person 
Responsible
 
Date completed or 
projected 
completion date
 
(
Include
 
the start date 
for anything that is 
‘in progress’)
 
Location 
Posted
 
Additional details
 
2
-
1 Final 
Stormwater 
Management 
Plan publicly 
available 
 
Completed
 
Town 
Website
 
Provide access 
to 
Stormwater 
Management 
Plan and
 
a 
contact for
 
public 
questions or 
comments. 
 
Department of 
Public Works
, 
Kirk A. 
Severance
.  
Completed
 
on
 
April 
29
th
, 2017
 
Stormwater 
Management 
Plan
  
The Town has a Stormwater 
Management Plan that was 
developed for the MS4 
Permit that was issued for 
the period 2017
-
2022. The 
CTDEEP reauthorized the 
MS4 Permit effective 
October 2023. 
 
BMP 
Activities in current 
reporting period
 
Sources Used 
(if applicable)
 
 
Method of 
Distribution
 
Audience (and 
number of 
people reached)
 
Measurable Goal
 
Department / 
Person 
Responsible
 
Additional details
 
factsheets
 
pertaining to 
managing
 
animal 
(pet and 
waterfowl) 
waste, septic 
system care, and livestock 
manure management. 
 
 
The Farmington Valley 
Health District 
(FVHD) 
provides additional 
education materials to the 
Town. 
 
 
 

Page 181

 
3
 
BMP 
Status 
(Complete, Ongoing, In 
Progress, or Not 
started)
 
Activities in 
current 
reporting 
period
 
Measurable 
Goal
 
Department / 
Person 
Responsible
 
Date completed or 
projected 
completion date
 
(
Include
 
the start date 
for anything that is 
‘in progress’)
 
Location 
Posted
 
Additional details
 
2
-
2 Comply 
with public 
notice 
requirements 
for Annual 
Reports 
(annually by 
2/15)
 
Completed
 
P
osted 2023 
Annual 
Report 
via 
Town 
website.
 
P
rovide access 
to 
2023 Annual 
Report 
and a 
contact for 
public 
questions or 
comments. 
 
Department of 
Public Works
, 
Kirk A. 
Severance
. 
Ongoing
-
 
Annual
ly 
 
Annual 
Report
s
  
Public comment and 
outreach were encouraged on 
the Town of Granby’s 
website during the comment 
period for the 2023 MS4 
Annual Report. 
 
2
-
3 
A
dditional 
BMP:
 
Hazardous 
Waste 
Collection
 
Completed 
 
In 
partnership 
with 
Farmington, 
Canton, 
Simsbury, and 
Avon for 
hazardous 
waste 
collection 
days.
 
Provide 
a safe 
way for the 
residents of 
Granby to 
dispose of 
hazardous 
materials that 
can accumulate 
in homes, 
preventing 
improper 
disposal that 
can pollute 
environmental 
resources.
 
Department of 
Public Works
, 
Kirk
 
A. 
Severance
. 
April 20
th
, June 8
th
, 
October 19th
 
2024
 
Hazardous 
Waste Day 
Collections
 
Collections are held three (3) 
times a year. 
 
 
2.2 
Describe any Public Involvement/Participation activities planned for the next year, if applicable. 
 
1. 
The 
Town of Granby will continue to encourage public comment and review for the 2024 Annual Report in 2025. 
 
2. The Town of Granby continues to receive public input on development projects through various avenues, including public hea
rings, online permitting processes, citizen 
comment periods, planning and zoning (P&Z) recorded meetings, posted agendas and minutes, notifications of all public hearings, decisions, and agendas, or phone 
communications.
 
3. 
The annual Hazardous Waste Collection, which is provided ann
ually, will be completed in 
202
5
. Specific dates are available on the Town website
.
 
 
 
 

Page 182

 
4
 
 
3. 
Illicit Discharge Detection and Elimination
 
(Section 6(
a
)(3) and Appendix B 
/ page 22
) 
 
3.1 BMP Summary 
 
BMP 
Status 
(Complete, 
Ongoing, In 
Progress, or 
Not started)
 
Activities 
in current 
reporting period
 
Measurable 
Goal
 
Department / Person 
Responsible
 
Date completed 
or
 
projected 
completion date
 
(
Include
 
the start date 
for anything that is 
‘in progress’)
 
Additional details
 
3
-
1 Develop 
written IDDE 
program 
(Due 
7/1/19)
 
Completed
 
The Town has 
completed a written 
IDDE program.
 
Develop 
written plan 
of IDDE 
program 
Department of Public Works
,
 
Kirk A. Severance
. 
 
Completed in 
November 201
7. 
The 
 
Town Ordinance
 
146
-
 
Stormwater 
Management, provided the legal 
authority to prohibit and eliminate illicit 
discharges. 
The IDDE Program was 
described in the Stormwater 
Management Plan. 
The 
Department of 
Public Works is the central reporting 
agency for citizen illicit discharge 
complaint filings. 
Illicit discharges are 
filed and updated periodically with 
abatement activities, sampling, or other 
pertinent information.
 
3
-
2 Develop list 
and maps of all 
MS4 
stormwater 
outfalls in 
priority areas
 
(Due 7/1/20)
 
Completed
 
The Town
 
has 
reviewed the list of 
all MS4 stormwater 
outfalls in priority 
areas based on 
updated information. 
 
All outfalls 
mapped
 
Department of Public Works
,
 
Kirk A. Severance
. 
Completed prior to 
July 2019
 
Mapping and data will be continually 
maintained as outfalls are tested, 
repaired, etc.
 
 
3
-
3 Implement 
citizen 
reporting 
program
 
(Ongoing)
 
Completed
 
The general public 
may report suspected 
illicit
 
discharges 
through the 
Department of Public 
Works or online.
 
Provide a 
reporting 
mechanism 
and log
 
Board of Selectmen/
 
Town 
Manager
 
Completed 
November 2018
 
The citizen reporting form for illicit 
discharges can be found here:
 
Citizen Reporting Program
 
3
-
4 Establish 
legal authority 
to prohibit 
illicit 
discharges
 
(Due 7/1/19)
 
Completed
 
An Illicit Discharge 
Detection and 
Elimination 
Ordinance was 
enacted in 2016. 
 
Adopt 
ordinance
 
Board of Selectmen/Town 
Manager
 
Completed 
November 2016
 
The Illicit Discharge Ordinance can be 
found here:
 
Illicit Discharge Ordinance
  
 

Page 183

 
5
 
BMP 
Status 
(Complete, 
Ongoing, In 
Progress, or 
Not started)
 
Activities 
in current 
reporting period
 
Measurable 
Goal
 
Department / Person 
Responsible
 
Date completed 
or
 
projected 
completion date
 
(
Include
 
the start date 
for anything that is 
‘in progress’)
 
Additional details
 
3
-
5 Develop 
record keeping 
system for 
IDDE tracking
 
(Due 7/1/17)
 
Ongoing
 
The Department of 
Public Works has 
developed a record 
keeping system. 
Utilizing Excel, illicit 
discharges are 
tracked.
 
Maintain 
IDDE list.
 
Department of Public 
Works/ Kirk A. Severance, 
Director of Public Works
 
Completed in 
November 2017
-
ongoing for 
throughout permit 
life.
 
 
3
-
6 
Address 
IDDE in areas 
with pollutants 
of concern
 
Ongoing
 
Wet weather 
screening was 
conducted at 
priority 
outfalls.
 
 
Dry weather 
inspections were 
conducted at outfalls 
throughout the Town.
 
 
Catchment Rankings 
have been completed. 
SSOs are under 
investigations.
 
Wet weather 
testing and 
additional 
investigation 
as necessary.
 
Department of Public 
Works/ Kirk A. Severance, 
Director of Public 
Works/Atlas
 
Ongoing Started
 
in 
2020
 
 
 
3.2 Describe any IDDE activities planned for the next year, if 
applicable.
 
1. Continue wet weather sampling 
and dry weather screening as a part of follow up and catchment investigations
. 
 
3. Respond to any illicit discharge complaints
. 
4. Conduct 
Follow
-
up and 
Catchment Investigations
. 
5. Continue to provide 
annual training to Town staff.
 
 
3.3 
Provide a record of all citizen reports of suspected illicit discharges and other illicit discharges occurring during the reporting period and 
SSOs occurring July 2017 
through end of reporting period using the following table. 
Illicit discharges are any
 
unpermitted discharge to waters of the 
state that do not consist entirely of stormwater or uncontaminated groundwater except those discharges identified in Section 
3(a)(2) of the MS4 general 
permit when such non-
stormwater discharges are not significant 
contributors of pollution to a discharge from an identified MS4.
 

Page 184

 
6
 
Location
 
(Lat long/ street 
crossing /address 
and receiving 
water)
 
Date and 
duration of 
occurrence
 
Discharge to MS4 
or surface water 
 
Estimated 
volume 
discharged
 
Known or suspected 
cause / Responsible 
party
 
Corrective measures planned and completed 
(include dates)
 
Sampling 
data 
(if 
applicable)
 
286 West Granby 
Road
 
4/9/2021
 
Approximately
 
195 
ft. from OF
-
152
 
Unknown
 
Underground spring
 
Atlas was called to investigate a potential illicit 
discharge in the Town. Upon arrival, water was 
found to be discharging from a driveway at a 
steady, bubbling rate, with heavy algae growth. 
Discharge lead down the driveway into an 
adjacent ditch. This 
runoff 
disch
arge
 
is in the 
vicinity of OF
-
152, which in turn discharges to 
the West Branch Salmon Brook. A sample of 
the discharge was submitted for the analysis of 
E. coli
, T. coli, nitrite, nitrate, and phosphorus 
to assess potential 
illicit
 
discharge sour
ces. A 
review of sampling data from the nearby MS4 
outfall (OF
-
152) did not indicate illicit 
discharges were entering this catchment. 
Laboratory analytical results were indicative of 
groundwater, and it is suspected 
an 
underground
 
spring had worked its way to the 
surface. 
 
E. coli
-
<10 
MPN/100mL
 
T. Coli
- 
10 
MPN/100mL
 
Nitrite
 - 
<0.010 mg/L
 
Nitrate
- 
0.55 
mg/L
 
Phosphorus
- 
0.304 mg/L
 
Canal Street
 
Unknown
 
None.
 
Unknown
 
Property Owner
 
A property owner diverted discharge from a 
sump pump. The discharge was directed down 
the driveway and into the road. The Town 
Engineer and 
Director of Public Works met 
with the property owner, and discussed 
redirecting the discharge, as well as icing 
concerns on the road. The property owner was 
responsive and
 
redirected the discharge onto a 
grassy area on the property. 
 
None. 
 
23 Glen Road 
 
12/15/2021
 
None.
 
Unknown
 
80
-
year
-
old
 
septic 
system
- 
end of life 
 
An evaluation by FVHD led to the 
replacement 
of the s
eptic system due to old age and being at 
the
 
end of 
its 
life.
 
Installation of a new 
1250
-
gallon
 
septic tank and leaching field was 
completed and a permit to discharge was 
granted, recommending the daily discharge 
should not exceed 2/3 of the permitted flow. 
 
None.
 
2022
 
21 Oakwood Drive 
 
3/21/2022
 
None.
 
Unknown
 
Unknown cause for 
replacement of septic 
system 
 
Following site evaluation by FVHD, 
installation of a new septic system was 
recommended for unknown reasons. Approval 
and a permit 
were
 
provided by FVHD for 
replacement with a new 
1000
-
gallon
 
septic 
tank and 495 s
eptic
 
leach field
. 
 
None.
 

Page 185

 
7
 
Location
 
(Lat long/ street 
crossing /address 
and receiving 
water)
 
Date and 
duration of 
occurrence
 
Discharge to MS4 
or surface water 
 
Estimated 
volume 
discharged
 
Known or suspected 
cause / Responsible 
party
 
Corrective measures planned and completed 
(include dates)
 
Sampling 
data 
(if 
applicable)
 
31 Harmony Hill 
Road
 
4/11/2022
 
East Branch 
Salmon Brook 
 
Unknown
 
Failed 
septic
 
system 
inspection
 
Site evaluation by FVHD resulted in 
a 
failed 
inspection 
of the 
septic system. Ins
t
allation of a 
new 
1000
-
gallon
 
septic tank and 495 
septic
 
leaching area was recommended. 
A proposal 
for septic system repair was submitted by a 
licensed installer.
 
None. 
 
73 Silkey Road 
 
6/
15
/2022
 
Mountain Brook/ 
Moosehorn Brook
 
Unknown
 
Unknown reason for 
septic system 
replacement
 
FVHD evaluated
 
the
 
site for installation of a 
new septic system for unknown reasons. 
A 
r
eplacement plan 
was provided by
 
the
 
installer
, 
which 
includes a two compartment 
1000
-
gallon
 
septic tank and
 
a 495 
septic
 
leaching field. 
FHVD approved the plan and provided a 
permit for replacement. 
 
None. 
 
6 Glen Road
 
9/21/
20
22
 
None. 
 
Unknown
 
Leaking tank due to 
invasive roots 
 
FVHD evaluated
 
the
 
septic system where 
the 
tank was leaking due to invasive roots. 
Recommendations for repair included 
installation of a new 
1000
-
gallon
 
septic tank 
and 495 
septic
 
leaching area. 
Awaiting 
installation and permit to repair. 
 
None. 
 
80 Canal Road
 
2022
 
MS4 System
 
Unknown
 
A sump 
pump was 
reported as discharging 
to the road and into a 
nearby catch basin. 
Icing on the road was 
also prevalent following 
this discharge.
 
The Town investigated this report. Following 
investigation, the resident rerouted the sump 
pump. 
 
None.
 
2023
 
Moose
h
orn Road 
cul
-
de
-
sac
 
7/18/2023
 
MS4 System, 
Adjacent Stream
 
Unknown
 
It appears that silt, 
sediment, and gravel 
from the driveway 
entered the Town’s 
MS4 system and an 
adjacent 
stream and
 
can 
therefore be considered 
an illicit discharge.
 
Site evaluation by Atlas resulted in a 
determination that the discharge was illicit. 
Washout from the shared driveway at 30, 31, 
33, and 54 Moose
h
orn Road was determined to 
have been the cause of the discharge. 
No 
corrective action has been done at this time.
 
None
 
The Town coordinated with the Farmington Valley Health District (FVHD) in October 2023 regarding addresses in the Town where 
septic system repairs were completed. 
According to the FVHD, approximately 27 septic repairs/replacements were conducted in 2023. Evaluation of these repairs are being conducted in coordination with Atlas to 
determine if certain sections of the Town have patterns of septic repairs and/or failures
. 
 
 
 
 
 

Page 186

 
8
 
Location
 
(Lat long/ street 
crossing /address 
and receiving 
water)
 
Date and 
duration of 
occurrence
 
Discharge to MS4 
or surface water 
 
Estimated 
volume 
discharged
 
Known or suspected 
cause / Responsible 
party
 
Corrective measures planned and completed 
(include dates)
 
Sampling 
data 
(if 
applicable)
 
2024
 
166 Salmon Brook 
Street 
 
9/15/2024
 
 
None. 
 
~50 gallons 
 
Pump failure at sanitary 
sewer pump station 
along Salmon Brook 
Road 
 
A small release of partially treated sewage 
occurred at a wastewater pumping station at 
166 Salmon Brook Street and Route 10. The 
pump station identified a pump failure, causing 
effluent to leak from the holding tank into a 
nearby swale running parallel to
 
Route 10. The 
tank cover remained intact, so the release 
consisted mostly of gray water rather than raw 
sewage. Fill material was placed in the swale to 
prevent discharge into the local brook, and the 
spill was contained within the swale without 
affecting
 
nearby water bodies. 
 
None. 
 
 
 
3.4 
Provide a summary of actions taken to address septic failures using the table below. 
 
Method used to track 
illicit discharge reports
 
Location and nature of structure 
with failing septic systems
 
Actions taken to respond to and address the 
failures
 
Impacted waterbody or 
watershed, if known
 
Dept. / Person 
responsible
 
T
he Farmington Valley Health District (FVHD) received and maintains records of septic failures along with actions taken. All s
anitary sewer connections and system 
extensions are
 
managed by the Building Department.
 
The Town will begin to formally coordinate with Building Department regarding records of septic failures. 
T
he Town is 
currently investigating any septic repairs and/or failures through the FVHD as well.
 
See 
Attachment 
I
 for 
a list of
 
septic 
repairs and replacements
.
 
 
 
 
3.5 Briefly describe the method and
 
effectiveness
 
of said method used to track illicit discharge reports.
 
Residents of the Town can report illicit discharges directly to the Department of Public Works, or via 
https://www.granby
-
ct.gov/DocumentCenter/View/217/Illicit
-
Discharge
-
Reporting
-
Form
-
PDF?bidId=
 
. The Department of Public Works staff then performs investigations. Digital recor
d
s 
on the Town server are used for tracking illicit discharges in 
excel format.
 
 
3.6 
IDDE reporting metrics
 
      
Metric
s 
 
Estimated or actual number of MS4 outfalls
 
185
 
Estimated or 
actual number of interconnections
 
Under 
I
nvestigation
 

Page 187

 
9
 
Metric
s 
 
Interconnection mapping complete
 
In progress
 
System
-
wide mapping complete (detailed MS4 
infrastructure) 
 
100%
 
Outfall assessment and priority ranking
 
100
% 
 
Eight (8
) outfalls 
were
 
chosen as priority outfalls
 
in 2022
. 
All eight (8) outfalls were sampled in 202
4
. 
Priority 
rankings may change throughout the permit
 
term
 
as new 
data are collected and evaluated
.
 
Dry weather screening of all High and Low priority 
outfalls complete
 
9
0
% 
 
All dry weather screening at outfalls in high priority 
outfalls and discharging to impaired waterbodies have 
been 
completed
. 
 
Catchment investigations complete
 
5 Follow
-
up investigations conducted in 2023
 
3 Follow
-
up investigations conducted in 2024
 
Estimated percentage of MS4 catchment area 
investigated
 
TBD
 
  
3.7 
Briefly describe the IDDE training for employees involved in carrying out IDDE tasks including what type of training is provided and how 
often 
it is
 given 
(minimum once per year).
 
In 
September 
2024, key staff in the Town of Granby received training to comply with the provisions of the Municipal Separate Storm Sewer S
ystem (MS4) General Permit. 
Annual training 
is
 
conducted to reinforce best practices for identifying and reporting illicit discharges and improper disposal, as well as spil
l response protocols. These sessions 
will also reiterate the Town’s general goals and objectives outlined in the Stormwater Manage
ment Plan (SMP).
 
 
4. C
onstruction Site Runoff Control
 
(Section 6(a)(4)
 
/ page 25
) 
 
4.1 BMP Summary 
 
BMP 
Status
 
(Complete, 
Ongoing, 
In 
Progress, 
or Not 
started)
 
A
ctivities in current reporting 
period
 
Measurable Goal
 
Department / 
Person 
Responsible
 
Date completed 
or
 
projected 
completion date
 
(
Include
 
the start 
date for anything 
that is ‘in progress’)
 
Additional details
 
4
-
1 Implement, 
upgrade, and enforce 
land use regulations or 
other legal authority to 
meet requirements of 
MS4 general permit 
(Due 7/1/20)
 
Ongoing 
throughout 
permit 
lifetime.
 
There have been no updates in 
land
-
use regulations or other 
legal authority as it pertains to 
the MS4 permit in the Town of 
Granby in 
202
4. 
Revise land
-
use 
regulations.
 
Department of 
Public Works/ Kirk 
A. Severance, 
Director of Public 
Works
 
Completed
 
in 2018
-
continues annually
 
These regulations 
include maintenance of 
detention basins, 
separators, and/or 
embankments used to 
manage stormwater
 
quality.
 

Page 188

 
10
 
BMP 
Status
 
(Complete, 
Ongoing, 
In 
Progress, 
or Not 
started)
 
A
ctivities in current reporting 
period
 
Measurable Goal
 
Department / 
Person 
Responsible
 
Date completed 
or
 
projected 
completion date
 
(
Include
 
the start 
date for anything 
that is ‘in progress’)
 
Additional details
 
4
-
2 Develop/Implement 
plan for 
interdepartmental 
coordination in site plan 
review and approval
 
(Ongoing)
 
Completed
 
Kevin W. Clark, P.E., L.S., 
Town Engineer prepares land 
use review letters for most 
applications to the Inland 
Wetlands Commission, 
Planning Commission and 
Zoning Commission.
 
Utilize 
interdepartmental 
coordination in site 
plan review and 
approval as it pertains 
to the MS4 permit.
 
Land Use 
Commission 
Members
 
Completed in 2017
-
continues annually
 
 
4-
3 Review site plans 
for stormwater quality 
concerns
 
(Ongoing)
 
Completed
 
Kevin W. Clark, P.E., L.S., 
Town Engineer encourages the 
use of LID and Stormwater 
BMPs practices as contained in 
the 2004 Connecticut 
Stormwater 
Quality Manual.
 
Issue review 
comments 
and
 
review revised 
plans for MS4 
compliance.
 
Town 
Engineer/Kevin W. 
Clark, P.E., L.S.
 
Completed in 20
1
7
-
continues annually
 
Projects that fall under 
the Planning and 
Zoning Department are 
reviewed for 
compliance with the 
CTDOT drainage 
manual.
 
4-
4 Conduct site 
inspections
 
(Ongoing)
 
Ongoing
 
The Town conducts 
construction site inspections for 
the proper implementation and 
maintenance of soil erosion and 
sediment control measures.
 
Document inspections 
and actions.
 
Community 
Development 
Department 
Director/Abigail 
Kenyon, 
AICP/Town 
Engineer/Kevin. W. 
Clark, P.E., L.S.
 
Completed in 2017
-
continues annually
 
 
4-
5 Implement 
procedure to allow 
public comment on site 
development
 
(Ongoing)
 
Ongoing
 
The land use 
application process 
allows for public comment on 
land use applications. 
Applications are submitted to 
the Inland Wetlands Agency, 
Planning Commission, Zoning 
Commission during the Public 
Hearing Process, when 
applicable.
 
Provide an opportunity 
for public comment/
 
involvement.
 
Community 
Development 
Department 
Director/ Abigail 
Kenyon, AICP
 
and Land Use 
Commission 
Members
 
Completed in 2017
-
 
continues annually
 
 
4-
6 Implement 
procedure to notify 
developers about DEEP 
construction 
stormwater permit
 
(Ongoing)
 
Ongoing
 
During engineering revi
ews, 
letters are typically prepared as 
part of the land use application 
process. These letters are used 
to make developers aware of the 
need to register for the 
Construction Stormwate
r 
General Permit.
 
Include comments to 
applications.
 
Community 
Development 
Department 
Director/Abigail 
Kenyon, AICP
 
and Town 
Engineer/Kevin W. 
Clark, P.E., L.S.
 
Completed in 2017
-
continues annually.
 
 
 
 

Page 189

 
11
 
4.2 Describe any Construction Site Runoff Control activities 
planned for the next year, if applicable.  
1. 
The Town will continue to utilize zoning regulations and inspections as a means to ensure BMPs are utilizing be site develope
rs.
 
 
5. 
Post
-
construction 
S
tormwater 
M
anagement
 
(Section 6(
a
)(5)
 
/ page 27
) 
 
5.1 
BMP Summary
 
BMP 
Status 
(Complete, 
Ongoing, In 
Progress, or 
Not started)
 
Ac
tivities in current reporting period
 
Measurable 
Goal
 
Department / 
Person 
Responsible
 
Date completed 
or projected 
completion date
 
(
Include
 
the start 
date for anything 
that is ‘in 
progress’)
 
Additional details
 
5-
1 Establish and/or 
update legal authority 
and guidelines 
regarding LID and 
runoff reduction in site 
development planning 
(Due 7/1/22)
 
In Progress
 
Current Town Building and Planning & 
Zoning regulations generally meet 
LID/runoff reduction requirements for 
development and redevelopment projects. 
 
Adopt BMPs 
for any 
activity, 
operation, or 
facility which 
may cause or 
contribute to 
the pollut
ant 
loading
 of 
stormwater, 
the storm 
drain system, 
or waters of 
the U.S.
 
Community 
Development 
Department 
Director/ 
Abigail Kenyon, 
AICP and Land 
Use 
Commission 
Members
 
Started in 2019
 
Zoning regulations were 
updated with Section 4.2
.4
 
Stormwater Management. 
The Town of Granby 
Zoning Regulations can be 
found here: 
 
ZONING 
REGULATIONS (granby
-
ct.gov)
 
5-
2 Enforce 
LID/runoff 
reduction requirements 
for development and 
redevelopment projects 
(Due 7/1/22)
 
In Progress
 
Current Town Building and Planning & 
Zoning regulations generally meet 
LID/runoff reduction requirements for 
development and redevelopment projects. 
As such, enforcement for such activities 
would be followed as any other Town 
coding violation would be.
 
Enforce 
regulations 
and guidelines 
of LID and 
runoff 
reductions.
 
Community 
Development 
Department 
Director/Abigail 
Kenyon, AICP, 
Town 
Engineer/Kevin 
W. Clark, P.E., 
L.S. and Land 
Use 
Commission 
Members
 
In progress
-
 
Started in July 
2019
 
The Town of Granby’s 
Planning and Zoning page 
can be found here:
 
Planning & Zoning 
Commission | Granby, CT 
(granby-
ct.gov)
 

Page 190

 
12
 
5-
3 Identify retention 
and detention ponds in 
priority areas (Due 
7/1/20)
 
Completed
 
A retention pond
 
layer
 
was added to 
in
 
ArcGIS for the Town.
 
Compile a list 
and complete 
mapping of 
Town
-
owned 
detention 
basins.
 
Department of 
Public Works/ 
Atlas,
 
Town 
Engineer/Kevin 
W. Clark, P.E., 
L.S.
 
Completed
 
 
5-
4 Implement long
-
term maintenance plan 
for stormwater basins 
and treatment 
structures (Ongoing)
 
Completed
 
A Long
-
Term Operation and 
Maintenance 
Plan was developed for the Town. This plan 
includes regular inspections and the 
documentation of all Town
-
owned retention 
basins on an as
-
needed
 
basis, with a 
minimum full inspection once every five (5) 
years.
 
Annually 
inspect and 
maintain
 
facilities.
 
Department of 
Public Works/ 
Kirk A. 
Severance, 
Director
 
and
 
Town 
Engineer/Kevin 
W. Clark, P.E., 
L.S.
 
Completed
 
 
5-
5 DCIA mapping 
(Due 7/1/20)
 
Completed
 
The DCIA was calculated for the Town 
with assistance from Nathan L. Jacobson & 
Associates. Atlas has mapped the DCIA 
areas through ArcGIS.
 
Provide an 
understandin
g 
of the Town’s 
overall DCIA 
to the MS4 
infrastructure.
 
Nathan L. 
Jacobson & 
Associates/Atlas
 
 
Completed
 
 
5-
6 Address post
-
construction issues in 
areas with pollutants of 
concern
 
In 
Progress
 
In post
-
construction areas, if erosion or high 
accumulation of sedimentation are found 
during the annual inspections conducted 
under the long
-
term maintenance plan, the 
Town of Granby will prioritize these areas 
for DCIA retrofit projects.
 
Address post
-
construction 
areas where 
erosion or 
high 
accumulation 
of 
sedimentation 
are found 
during annual 
inspections.
 
Community 
Development 
Department 
Director/Abigail 
Kenyon, AICP 
and Town 
Engineer, Kevin 
W. Clark, P.E., 
L.S.
 
In Progress
-
Started in 2021
 
 
 
5.2 Describe any Post
-
Construction Stormwater Management activities planned for the next year, if applicable.
 
 
The Town will continue to monitor, clean, and repair settling/silting basins, catch basins, outfalls, swales, etc
. in 2025.
 
 
5.3 Post-
Construction
 
Stormwater Management
 
reporting metrics
 
For details on this requirement, visit 
https://nemo.uconn.edu/ms4/tasks/post-construction/
.  Scroll down to the DCIA section.  
Metrics
 
B
aseline 
(
2012
) 
Directly Connected Impervious Area (DCIA)
 
21.19 
acres
 

Page 191

 
13
 
DCIA disconnected (redevelopment plus retrofits)
 
acres this year
 (TBD) 
/ acres total
 (TBD) 
Retrofit
 
projects
 
completed
 
Under Development
 
DCIA disconnected
 
0 
% 
This
 
yea
r  
Estimated cost of retrofits
 
$TBD 
Detention or retention ponds identified
 
4
 
detention ponds and 
4
 
retention
 
ponds. 
 
 
5.4 Briefly describe the method to be used to determine baseline DCIA.
    
The DCIA Mapping was conducted in substantial 
accordance with the methodologies presented in the October 25, 2017 UConn CLEAR Webinar entitled CT MS4 Mapping 
Details, Clarifications and Tools, the October 19, 2018 UConn CLEAR Workshop entitled CT MS4 Mapping Workshop as well as information contained i
n the EPA reference 
entitled Estimating Change in Impervious Area (IA) and Directly Connected Impervious Area (DCIA) for Massachusetts Small MS4 
Permit utilizing Sutherland equations.
 
 
The DCIA computations were prepared utilizing Connecticut Environmental Conditions Online MS4 base mapping prepared by 
UConn.
 
CLEAR. 
 
Impaired waters were determined from the report entitled 2018 Integrated Water Quality Report, dated August 01, 2019, prepared by the State of Connecticut Department of 
Energy and Environmental protection.
 
 
The method to determine the 2012 baseline DCIA was to first compile the CT DEEP drainage basin characteristics in a Microsoft
 
Excel spreadsheet. Information on the 
Connecticut Environmental Conditions Online MS4 Mapping was used to determine the impervious
 
area breakdown as Buildings, Roads and Other. For CT DEEP drainage 
basins that fell in two or more municipalities the advanced mapping tab of Connecticut Environmental Conditions Online was us
ed to delineate and determine the applicable town 
CT DEEP basin
 
area. It was assumed that the entire drainage basin characteristics were directly proportional to the applicable town CT DEEP
 
drainage basin area.
 
 
In that ConnDOT has a MS4 Stormwater Program which applies to state owned roads and facilities which the town has no control 
over, it was decided that the impervious state 
road area would be determined and deducted from the total impervious road area for e
ach CT DEEP drainage basin as the impervious road areas associated with state highways 
and facilities constitutes a considerable portion of the total town impervious road area.
 
 
The ConnDOT state highway, parking lot and facility impervious road areas were then determined for each CT DEEP drainage basi
n. The ConnDOT state highway, parking lot 
and facility impervious road areas were then deducted from the total town impervious road
 
area to determine a town owned impervious road area for each CT DEEP drainage 
basin. Subsequent to the above deduction, the total impervious area in acres and percentage was then recomputed for each CT D
EEP drainage basin.
 
 
The DCIA formula for each of four development types was then utilized to compute the DCIA. The impervious area in acres was a
ssigned to each of the four Sutherland 
equations which were modified for the northeastern United State. The Sutherland equation to be utilized was determined using the following methodology:
 
 
For impervious percentage less than 6%:
 
100% of the impervious area was assigned to the slight connectivity Sutherland Equation where DCIA% = 0.01*(IA%)2.0
 
 
For an impervious area between 6% and 12 %:
 
50% of the area was assigned to the partial connectivity Sutherland Equation where DCIA% = 0.04*(IA%)1.7
 
and
 
50% was assigned to the average connectivity Sutherland Equation where DCIA% = 
0.10*(IA%)1.5
 
 
For an impervious area between 12% and 18 %:
 
50% of the area was assigned to the average connectivity Sutherland Equation where DCIA% = 0.10*(IA%)1.5
 
and
 

Page 192

 
14
 
50% was assigned to the high connectivity Sutherland Equation where DCIA% = 0.40*(IA%)1.2
 
 
For an impervious area of greater than 18 %:
 
100% of the area was assigned to the high connectivity Sutherland Equation where DCIA% = 0.40*(IA%)1.2
 
 
The DCIA for each CT DEEP drainage basin was then summed to determine the entire town DCIA. Subsequent to completion of 2012 
Baseline DCIA computations, UConn 
CLEAR Mapping available on Connecticut Environmental Conditions Online (CT ECO) was revised to se
parate road impervious area into State Road Impervious Area (Acres) 
and Town Road Impervious Area (Acres).
 
 
The original 2012 Baseline DCIA computations were revised utilizing the UConn CLEAR State Road Impervious Area (Acres) and To
wn Road Impervious Area (Acres).
 
 
6. 
Pollution Prevention/Good Housekeeping
 
(Section 6(
a
)(6)
 
/ page 31
)
 
 
6.1 BMP Summary 
 
BMP 
Status
 
(Complete, 
Ongoing, 
In 
Progress, 
or Not 
started)
 
A
ctivities in current reporting 
period
 
Measurable Goal
 
Dep
artment / 
Person 
Responsible
 
Date completed 
or
 
projected 
completion date
 
(
Include
 
the start 
date for anything 
that is ‘in 
progress’)
 
Additional details
 
6-
1 Develop/implement 
formal employee 
training program 
(Ongoing)
 
Ongoing
 
Annual training related to the MS4 
permit was conducted
 
in 
September of 2024
 
by Atlas to the 
Town’s Department of Public 
Works and other applicable staff.
 
Eliminate non
-
stormwater 
discharges into the 
storm sewers
 
Department of 
Public 
Works/Atlas
 
 
Ongoing 
Completed
 
Annually
 
Annual training was 
completed in 
September of
 
2024.
 
6-
2 Implement MS4 
property and 
operations maintenance 
(Ongoing)
 
Ongoing
 
The Public Works maintains 
outdoor maintenance at the Town’s 
parks, school grounds, and all 
other Town
-
owned land. 
Additionally, the Public Works 
manages roads, including 
maintenance, resurfacing, drainage 
repairs, signage, winter plowing, 
street sweeping, etc.
 
Eliminates/minimizes 
spills and/or pollutant 
releases to the 
environment and 
navigable waterways.
 
Department of 
Public Works/ 
Kirk A. 
Severance, 
Director
 
Ongoing 
throughout permit 
term
. 
 
6-
3 Implement 
coordination with 
interconnected MS4s
 
Ongoing
 
Coordination of the M
S4 
interconnection mapping bega
n in 
2019. CTDOT interconnections are 
currently under investigation by 
the 
CTDOT and
 
will be added to 
the Town’s GIS system once this 
information is available. 
Inter
connections of surrounding 
Town
s are pending investigation.
 
Update the GI
S 
system with 
interconnected 
locations.
 
Department of 
Public Works/ 
Kirk A. 
Severance, 
Director/Atlas
 
Ongoing Started
 
in 2019
 
 

Page 193

15
 
BMP 
Status
 
(Complete, 
Ongoing, 
In 
Progress, 
or Not 
started)
 
A
ctivities in current reporting 
period
 
Measurable Goal
 
Dep
artment / 
Person 
Responsible
 
Date completed 
or
 
projected 
completion date
 
(
Include
 
the start 
date for anything 
that is ‘in 
progress’)
 
Additional details
 
6-
4 Develop/implement
program to control
other sources of
pollutants to the MS4
Completed
 
Department of 
Public Works/ 
Kirk A. 
Severance, 
Director/Atlas
 
Completed
 
The 
 
Town Ordinance
 
146
-
 
Stormwater Management, 
provided the legal authority 
to regulate activities that 
contribute pollutants to the 
MS4 system.
 
6-
5 Evaluate additional
measures for discharges
to impaired waters*
Ongoing
 
Wet weather sampling events have 
been conducted, and priority 
outfalls were identified throughout 
the Town. Dry weather inspections 
are continuing for the entirety of 
the Town. As catchments are 
investigated, the Town will 
take
 
measures to reduc
e pollutants of 
concern
. 
Follow
-
up and 
Catchment 
Investigation and 
corrective actions
 
Department of 
Public Works/ 
Kirk A. 
Severance, 
Director/Atlas
 
Ongoing
-
Started 
in 2018
 
Based on wet and 
dry 
weather testing, the Town 
will implement additional 
measures including but not 
limited to a retrofit program 
or source management to 
correct the problem at 
municipally owned
 or 
operated facilities, as well as 
IDDEs, where applicable.
 
6-
6 Track projects that
disconnect DCIA
(Ongoing)
Ongoing
 
A Stormwater Retrofit Program 
has been 
drafted and
 
will be 
utilized as a method of tracking 
future DCIA disconnects.
 
Track DCIA 
disconnects.
 
Department of 
Public Works/ 
Kirk A. 
Severance, 
Director/Atlas
 
Ongoing Started
 
in 2021
 
The Town will utilize the 
Impervious Cover Tracking 
Sheet created by NEMO. 
This will allow the Town to 
track Project information, 
new developments, 
redevelopment, retrofits, 
changes in impervious 
cover, and cumulative totals.
 
6-
7 Implement
infrastructure
repair/rehab program
(Due 7/1/21)
Ongoing
 
Inspections and maintenance are 
continually implemented 
throughout the Town’s MS4 
infrastructure. 
Reduce/ eliminate 
causes or 
contributions of 
pollution or 
contamination of 
stormwater, the 
storm drain system, 
or waters of the U.S.
 
Department of 
Public Works/ 
Kirk A. 
Severance, 
Director
 
Ongoing
-
Started 
in 2021
 
6-
8 Develop/implement
plan to
identify/prioritize
retrofit projects (Due
7/1/20)
Ongoing
 
A Stormwater Retrofit Program 
has been drafted. Prioritized areas 
and/or sites were 
identified based 
off of DCIA calculations, impaired 
waterbodies, current stormwater 
infrastructure, and the MEP of the 
Town.
 
Develop retrofit 
projects
 
Department of 
Public Works/ 
Kirk A. 
Severance, 
Director
 
Ongoing
-
Started 
in 2021
 

Page 194

 
16
 
BMP 
Status
 
(Complete, 
Ongoing, 
In 
Progress, 
or Not 
started)
 
A
ctivities in current reporting 
period
 
Measurable Goal
 
Dep
artment / 
Person 
Responsible
 
Date completed 
or
 
projected 
completion date
 
(
Include
 
the start 
date for anything 
that is ‘in 
progress’)
 
Additional details
 
6-
9 Implement retrofit 
projects to disconnect 
2% of DCIA (Due 
7/1/22)
 
Ongoing
 
As Retrofit Projects are identified, 
the Town will utilize the 
Impervious Cover Tracking Sheet 
to track and work towards 
disconnecting 2% of DCIA, or the 
MEP of the Town.
 
Track and reduce 
DCIA impacts.
 
Department of 
Public Works/ 
Kirk A. 
Severance, 
Director
 
Ongoing
-
Started 
in 2021
 
 
6-
10 
Develop/implement 
street sweeping 
program (Ongoing)
 
Ongoing
 
The Town currently implements a 
road sweeping program to address 
known areas of high sediment 
accumulation.
 
Track swept lane 
miles.
 
 
Department of 
Public Works/ 
Kirk A. 
Severance, 
Director
 
Ongoing 
throughout permit 
term
 
 
6-
11 
Develop/implement 
catch basin cleaning 
program (Ongoing)
 
Ongoing
 
The Town currently cleans catch
-
basins in areas where known 
conditions warrant sediment 
removal.
 
Track material usage, 
and update plan as 
needed.
 
Department of 
Public Works/ 
Kirk A. 
Severance, 
Director
 
Ongoing 
throughout permit 
term
 
 
6-
12 
Develop/implement 
snow management 
practices (Due 7/1/18)
 
Ongoing
 
The Town 
utilizes alternative road 
de
-
icing mixtures. These mixtures 
are modified on a yearly basis 
based on costs and emerging 
technologies.
 
Track material usage, 
and update plan as 
needed.
 
Department of 
Public Works/ 
Kirk A. 
Severance, 
Director
 
Ongoing 
throughout permit 
term
 
 
 
6.2 Describe any Pollution Prevention/Good Housekeeping activities planned for the next year, if applicable. 
1. Continue snow management and road sweeping activities
 
2. 
I
mplementation of the Stormwater Retrofit Program
 
3.Update Catch 
Basin Cleaning Program and schedule basin cleanings for 202
5.
 
 
6.3 Pollution Prevention
/ Good Housekeeping
 
reporting metrics
 
Metrics
 
Employee training provided for key staff 
 
September 2024
 
Street sweeping
 
Curb miles swept
 
miles
 
Volume (or mass) of 
material collected
 
tons
 
 
Catch basin cleaning
 

Page 195

 
17
 
 
 
 
 
 
 
 
6.4
 
Catch basin cleaning program 
 
Provide any updates or modifications to your catch basin cleaning program.
 
There are 1,
538
 
catch basins in the Town of Granby.
 
 
2017 
- 
Approximately 480 catch basins were cleaned in 2017 by a subcontracted catch basin cleaning company. The catch basin cleanings are screened and recycled at the 
former town landfill site in conformance with CT DEEP regulatory guidance.
 
 
2018 
- 
No catch basins were 
vacuumed
. The sump depth (sump bottom to lowest pipe invert out) and accumulated sediment/debris depth was measured for more than 700
 
catch 
basins.
  
 
2019 
- 
No catch basins were 
vacuumed
. The sump depth (sump bottom to lowest pipe invert out) and accumulated sediment/debris depth was measured for more than 500
 
catch 
basins. Catch basins to be cleaned in early 2020 where applicable.
 
 
2020 
- 
Approximately 844 catch basins were cleaned in spring of 2020 by a subcontracted catch basin cleaning company (including some
 
dry wells). The catch basin cleanings 
are screened and recycled at the former 
Town
 
landfill site
, 
in conformance with CT DEEP regulatory guidance.
  
 
2021:
 
Approximately
 
555 catch basins were cleaned in the spring of 2021 by a subcontracted catch basin cleaning company. The catch basin cleanings are screened and 
recycled at the former Town landfill site, in conformance with CTDEEP regulatory guidance.
 
 
2022: 
No catch basins were 
vacuumed
. The sump depth (sump bottom to lowest pipe invert out) and accumulated sediment/debris depth was measured for 91 catch basi
ns. 
Catch basins will be cleaned in early 2023 where applicable.
 
 
Metrics
 
Total catch basins in priority 
areas (
value will be less than or equal to total catch 
basins town or institution
-
wide)
 
1,227
 
Total catch basins 
town
-
 
(or institution
-
) wide
 
1,
538
 
Catch basins 
inspected
 
725
 
Catch basins cleaned
 
671
 
Volume (or mass) of material removed from all catch basins
 
425
 
tons
 
Volume removed from catch basins to impaired waters (if known)
 
120 tons
 
Snow management
 
Type(s) of deicing material used
 
Treated Salt
 
(
Clearlane) 
 
Total amount of each deicing material applied
 
892.83 
tons
 
Type(s) of deicing equipment used
 
1.
 
One (1) 10
-
Wheeler Plow/Spreader
 
2.
 
Seven (7) 6
-
Wheeler Plows/Spreaders
 
3.
 
One (1) Mason Plow/Spreader
 
*Application rate is 2
00 
lbs.
 
per lane mile
 
Lane
-
miles treated
 
(A lane
-
mile is a mile of roadway in a single driving lane)
 
188 lane
-
miles
 
Snow disposal location
 
Site specific
-
no Town snow yard
 
Staff training provided on application methods & equipment
 
 
Municipal turf 
management program actions (for permittee properties in basins with N/P impairments)
 
Reduction in application of fertilizers (since start of permit)
 
No
 
Reduction in turf area (since start of permit)
 
No 
 
Lands with high potential to contribute 
bacteria (dog parks, parks with open water, & sites with failing septic systems)
 
Cost of mitigation actions/retrofits
 
$
235,818.00 in upgrading the sewer pump station at the 
Salmon Brook Park. 
 

Page 196

 
18
 
2023: Approximately 483 catch basins were cleaned in the spring of 2023 with an approximate material volume of 140 tons remov
ed. 
 
 
2024: 
Approximately 725 catch basins were cleaned in 2024 with an approximate material volume of 425 tons removed. 
 
 
 
 
6
.5
 
Retrofit 
Program
 
 
B
riefly describe the 
Retrofit Program
 
identification and prioritization process, the
 
projects 
selected for implementation, 
the rationale for the selection of
 
those 
projects and the total DCIA to be disconnected upon 
completion of each
 
project. 
(Due 7/1/20)
 
 
The Stormwater Retrofit Program 
was
 
drafted by the Town and Atlas
 
in 2021
. The Program was designed to provide guidance on implementing LID, runoff reduction 
measures, or other means to disconnect or improve stormwater quality. To meet the 2% MEP disconnection goal, DCIA calculations, Urbanized areas, Impaired Waterbodies, 
and 
Catchment Rankings were utilized in identifying and prioritizing areas and/or projects to be selected for retrofits.
 
 
DCIA by Catchment was identified utilizing the following formulas: 
 
 
High Connectivity
 
DCIA%=0.4*(IA 
%) ^
1.2
 
Directly Connected Area= (DCIA
) (IC Acres)
 
 
Average Connectivity
 
DCIA%=0.1*(IA
%) ^
1.5
 
Directly Connected Area= (DCIA
) (IC Acres)
 
 
Partial Connectivity
 
DCIA%=0.04*(IA
%) ^
1.7
 
Directly Connected Area= (DCIA
) (
IC 
Acres)
 
 
Slight Connectivity
 
DCIA%=0.01*(IA
%) ^
2.0
 
Directly Connected Area= (DCIA
) (IC Acres)
 
  
 
The Average Connectivity calculation was utilized in assessing the Town’s DCIA connectivity, based on the majority of land ut
ilizing defined as agricultural and/or rural, minor 
residential communities, and minor
-
to
-
moderate commercial or 
industrialized
 
areas. 
Based on the Average Connectivity calculations for each 
catchment
, no catchments were 
identified with a connectivity of 11% or greater.
 
 
Catchments were then prioritized utilizing the total urbanized area per catchment. Atlas was provided with a shapefile of the
 
2010 Urbanized Areas for the Town from the 2010 
Census or Urban 
Classification
, which was 
imported
 
into ArcGIS for calculation purposes. Utilizing the Overlay
-
Intersect Tool, Atlas was able to extract the total Urbanized 
Area acreage per catchment, and then calculate the Urbanized area percentage per catchment utilizing the following formula: Based on these calculations, 28 catchments were 
identified with Urbanized Areas
 
 
Urbanized Area (Ac.)/Basin Total Acreage*100
 
 
28 catchments containing impaired waterbodies were identified for the Town.
 
 

Page 197

 
19
 
Catchment Priority Rankings were conducted for all Sub
-
Basins in the Town. Multiple factors were taken into consideration when scoring each catchment, including but not 
limited to DCIA calculations, previous screening results, age of development/structures, density of generating sites, nearby sewer repairs, urbanized areas, and impaired 
waterbodies. 52 catchments were identified as Problem or High Priority. 
 
 
Specific criteria 
were
 
utilizing in defining priority areas for the implementation of non
-
municipal retrofit projects. The criteria utilized in defining priority areas of non
-
municipal retrofit projects included High or Problem catchment priority rankings, catchments containing
 
an impaired waterbody, and catchments identified with an urbanized 
area. Utilizing ArcGIS, Atlas extracted catchments where two (2) or more of the aforementioned criteria were found. Community
 
outreach or project redevelopment is 
enc
ouraged in these defined catchments. 
 
 
Describe plans for continuing the Retrofit program and how to achieve a goal of 1% DCIA disconnection 
annually 
in future years.  
(Due 7/1/22)
 
 
The Stormwater Retrofit Program
 
is designed to comply with 
Section (6) (B) (ii)
 
of the CTDEEP 2017
-
2022 MS4 Permit. The Town of 
Granby
 
will work towards disconnecting 
existing DCIA. The initial focus of the Stormwater Retrofit Program will first be applied to Town
-
owned properties, parks, and other facilities, followed by a focus of non
-
municipal facilities, parks, communities, or other 
redevelopments. Progress towards the DCIA disconnects will be tracked and continuously updated, with a goal to disconnect 
one percent (1%) of DCIA or to the MEP each year following the fifth year of th
e MS4 permit.
 
 

Page 198

 
20
 
Part 
II
: 
Impaired waters investigation and monitoring  
 
1.
 
 I
mpaired waters investigation and monitoring program
 
For details on this requirement, visit
 
https://nemo.uconn.edu/2020/02/26/monitoring-
req
uirement
-
for
-
bacteria
-
impaired
-
waters/
.  Refer to the yellow column of the Monitoring comparison chart and the Impaired waters 
monitoring flowchart.  
 
1.1
 
Indicate which stormwater pollutant(s) of concern occur(s) in your municipality or institution.
 
This data is available 
on the MS4 map viewer:  
http://s.uconn.edu/ctms4map
. 
 
Nitrogen/ Phosphorus 
 
 
 
Bacteria  
 
    
Mercury 
 
 
       
Other Pollutant of Concern   
 
 
1.2 
Describe 
program status
 
 
 
2. 
S
creening 
data for 
outfalls to impaired waterbodies
 
(Section 6(i
)
(1)
 
/ page 4
1)
 
 
2.1 Screening data 
 
 
Complete the table below to report data for any wet weather sampling completed for MS4 outfalls that discharge  
www.nemo.uconn.edu/ms4/tasks/monitoring.htm
.  Refer to the yellow column of the Monitoring comparison chart 
and the Impaired waters monitoring flowchart.  
 
Each Annual Report will add on to the previous year’s data showing a cumulative list of sampling data. 
You may 
also attach 
an excel spreadsheet
 
with the same data rather than copying it into this table
. If you do attach a 
spreadsheet, please write “See Attachment” below.
  
 
See Attachment 
II
 
 
 
Follow
-up investigation required (last column) if the following pollutant thresholds are exceeded: 
 
Pollutant of concern
 
Pollutant threshold
 
Nitrogen 
 
Total N > 2.5 mg/l
 
Phosphorus
 
Total P > 0.3 mg/l
 
Bacteria (fresh 
waterbody)
 
•
 
E. coli > 235 col/100ml for swimming areas or 410 col/100ml for all others
 
•
 
Total Coliform > 500 col/100ml
 
Bacteria (salt waterbody)
 
•
 
Fecal Coliform > 31 col/100ml for Class SA and > 260 col/100ml for Class SB
 
Discuss 1) the status of 
monitoring work completed, 2) a summary of the results and any notable findings, and 3) any changes to 
the Stormwater Management Plan based on monitoring results.
 
W
et weather sampling at outfalls that discharge to impaired waterbodies
 
was completed in 2018 and in 2020. These results were 
evaluated, and eight priority outfalls were selected. These priority outfalls have been sampled each year between 2020 and 20
24
. Wet 
weather 
samples were 
analyzed for E. coli
 
and total coliform
. 
Refer to 
Attachment 
II
 
for the documented wet weather screening and 
priority outfall results. See 
Figures
 1-
6 
for associated GIS maps related to monitoring.
 
 
Dry weather screening 
has been completed for 166 of 185 outfalls. Dry weather inspections were completed for 
59 
outfalls
 
in 2024. 
These screenings documented the condition of the outfalls, erosion control. Material subtype, and diameter of the outfalls. The condition 
and erosion control of these outfalls and/or surrounding areas were ranked with the following descriptors: ex
cellent, good, fair, and poor. 
Outfalls found with poor to fair conditions and/or erosion controls were recommended for repair or implementation of addition
a
l erosion 
controls. Refer to 
Attachment
s III and IV
 
for
 
the documented dry weather screenings.
 

Page 199

 
21
 
 
•
 
Enterococci > 104 
col/100ml for swimming areas or 500 col/100 for all others
 
Other pollutants of concern
 
Sample turbidity is 5 NTU > in
-
stream 
sample.
 
 
 
 
3. 
Follow
-
up investigations
 
(Section 6(i)(1)(D) / page 43
)
 
 
Provide the following information for outfalls exceeding the pollutant threshold.  
 
Outfall 
ID
 
Status of drainage area investigation
 
Control measure to address impairment
 
OF
-
13
 
Initial investigation
 
Investigation ongoing, possible agricultural sources of 
pollutants
 
OF
-
14
 
Initial 
investigation
 
Investigation ongoing, possible agricultural sources of 
pollutants
 
OF
-
15
 
Initial investigation
 
Investigation ongoing
 
OF
-
74
 
Initial investigation
 
Investigation ongoing, possible agricultural sources of 
pollutants
 
OF
-
73
 
Initial investigation
 
Investigation ongoing, possible agricultural sources of 
pollutants
 
OF
-
155
 
Initial investigation
 
Investigation ongoing, possible agricultural sources of 
pollutants
 
OF
-
177
 
Initial investigation
 
Investigation ongoing
 
 
4. 
Prioritized outfall monitoring 
(Section 6(i)(1)(D) / page 43)
 
 
Once outfall 
sampling 
has been completed for at least 50% of outfalls to impaired waters, identify 6 of the highest 
contributors of any pollutants of concern.  Begin monitoring these outfalls on an annual basis by July 1, 2021. 
You 
may also attach an excel spreadsheet with the same data rather than copying it to this table. 
If you do attach a 
spreadsheet, please write “See Attachment” below.
 
See
 
Attachment II
 
for prioritized outfall 
monitoring results.
 
 

Page 200

 
22
 
Part 
I
II
: 
Additional IDDE 
Program 
Data
 
 
 
1.
 
Assessment and Priority Ranking of Catchments data
 
(Appendix B (A)(7)(c) / page 5)
 
 
Provide a list of all catchments with ranking results (DEEP basins may be used instead of manual catchment delineations). 
See 
Attachment V
 
for 
methodologies used for rank catchments. 
1. Catchment ID 
(DEEP Basin ID)
 
2. Category
 
3. Rank
 
4001
-
00
-
1*
 
Low 
Priority
 
4
 
4300
-
44
-
1
-
L1
 
Problem
 
8
 
4309
-
00
-
1
 
Low Priority
 
3
 
4309
-
01
-
1
 
High Priority
 
10
 
4309
-
02
-
1
 
Low Priority
 
3
 
4319
-
00
-
2
-
R1
 
High Priority
 
16
 
4319
-
00
-
2
-
R2
 
High Priority
 
14
 
4319
-
00
-
3
-
R1
 
Problem
 
7
 
4319
-
00
-
3
-
R2
 
Problem
 
8
 
4319
-
00
-
3
-
R3
 
Low 
Priority
 
5
 
4319
-
00
-
3
-
R4
 
Problem
 
8
 
4319
-
00
-
3
-
R5
 
High Priority
 
19
 
4319
-
00
-
3
-
R6
 
High Priority
 
12
 
4319
-
02
-
1
 
Problem
 
8
 
4319
-
03
-
2
-
R1
 
Low Priority
 
2
 
4319
-
03
-
2
-
R2
 
Problem
 
9
 
4319
-
04
-
1
 
Problem
 
9
 
4319
-
05
-
1
 
Problem
 
8
 
4319
-
06
-
1
 
Low Priority
 
4
 
4319
-
07
-
1
 
Problem
 
8
 
4319
-
08
-
1
 
Problem
 
8
 
4319
-
09
-
1
 
Problem
 
7
 
4319
-
10
-
2
-
L1
 
Problem
 
9
 
4319
-
10
-
2
-
L2
 
Low Priority
 
2
 
4319
-
10
-
2
-
R1
 
Low Priority
 
2
 
4319
-
11
-
1
 
Low Priority
 
3
 
4320
-
00
-
1
 
Low Priority
 
3
 
4320
-
00
-
2
-
R1
 
Low Priority
 
5
 
4320
-
00
-
2
-
R2
 
Problem
 
6
 
4320
-
00
-
2
-
R3
 
Problem
 
5
 
4320
-
00
-
2
-
R4
 
Problem
 
4
 
4320
-
00
-
3
-
L1
 
Problem
 
8
 
4320
-
00
-
3
-
R1
 
Problem
 
7
 
4320
-
00
-
3
-
R2
 
Problem
 
9
 
4320
-
00
-
3
-
R3
 
High Priority
 
8
 
4320
-
00
-
3
-
R4
 
Problem
 
8
 
4320
-
00
-
3
-
R5
 
High Priority
 
16
 

Page 201

 
23
 
4320
-
00
-
3
-
R6
 
Problem
 
9
 
4320
-
00
-
4
-
R1
 
High 
Priority
 
16
 
4320
-
00
-
4
-
R2
 
Problem
 
8
 
4320
-
00
-
4
-
R3
 
Problem
 
6
 
4320
-
00
-
4
-
R4
 
Low Priority
 
3
 
4320
-
01
-
1
 
Problem
 
7
 
4320
-
02
-
1
 
Problem
 
8
 
4320
-
03
-
1
 
High Priority
 
11
 
4320
-
04
-
1
 
Problem
 
7
 
4320
-
05
-
2
-
R1
 
Low Priority
 
3
 
4320
-
05
-
2
-
R2
 
High Priority
 
10
 
4320
-
07
-
1
 
Low Priority
 
3
 
4320
-
08
-
1
 
Problem
 
6
 
4320
-
09
-
1
 
High Priority
 
11
 
4320
-
10
-
1
 
High Priority
 
12
 
4320
-
10
-
2
-
R1
 
Low Priority
 
5
 
4320
-
11
-
1
 
Problem
 
7
 
4320
-
12
-
1
 
High Priority
 
12
 
4320
-
12
-
2
-
R1
 
Low Priority
 
2
 
4320
-
13
-
1
 
Problem
 
9
 
4320
-
13
-
1
-
L1
 
High 
Priority
 
13
 
4320
-
14
-
1
 
High Priority
 
13
 
4320
-
15
-
2
-
R1
 
High Priority
 
10
 
4320
-
15
-
3
-
R1
 
High Priority
 
12
 
4320
-
16
-
1
 
Problem
 
10
 
4320
-
17
-
1
 
High Priority
 
12
 
4320
-
17
-
2
-
R1
 
Problem
 
6
 
4320
-
17
-
3
-
R1
 
Low Priority
 
3
 
4320
-
21
-
1
 
Problem
 
4
 
4320
-
21
-
1
-
L1
 
Problem
 
8
 
4320
-
22
-
1
 
Problem
 
9
 
4320
-
26
-
1
-
L1
 
Problem
 
9
 
 
2.
 
Outfall and Interconnection Screening and Sampling data
 
(Appendix B (A)(7)(d) / page 7)
 
 
2.1 Dry weather screening and sampling data from outfalls and interconnections
 
For details on this requirement, visit 
https://nemo.uconn.edu/2020/02/26/monitoring-
requirement
-
for
-
bacteria
-
impaired
-
waters/
.  Refer to the blue column 
of the Monitoring comparison chart and the IDDE baseline monitoring flowchart.  
Provide sample data for outfalls where flow is observed. Only include Pollutant of concern data for outfalls that discharge i
n
to
 stormwater impaired 
waterbodies.  
You may also attach 
an excel spreadsheet
 
with the same data rather than copying it to this table.
 
If you do attach a spreadsheet, 
please write “See Attachment” below.
 
 
2.2 
Wet weather sample and inspection data
 

Page 202

 
24
 
For details on 
this requirement, visit
 
https://nemo.uconn.edu/2020/02/26/monitoring-
requirement
-
for
-
bacteria
-
impaired
-
waters/
.  
Refer to the green 
column of the Monitoring comparison chart and the IDDE catchment investigation flowchart.  
 
Provide sample data for outfalls and key junction manholes of any catchment area with at least one System Vulnerability Facto
r.  
You may also attach 
an excel spreadsheet
 
with the same data rather than copying it to this table.
 
If you do attach a spreadsheet, please write “See Attachment” below.
 
 
1.
 
Catchment Investigation data
 
(Appendix B (A)(7)(e) / page 9)
 
For details on this requirement, visit 
www.nemo.uconn.edu/ms4/tasks/monitoring.htm
.  Refer to the green column of the Monitoring comparison chart 
and the IDDE catchment investigation flowchart. 
90% All catchments (utilizing basins for assessment purposes), have been ranked and prioritized. 
 
 
3.1 System Vulnerability Factor Summary 
 
For those catchments being investigated for illicit discharges (i.e., categorized as high priority, low priority, or problem) document the presence or 
absence of System Vulnerability Factors (SVF).  If present, report which SVF’s were identified.   An example is provided below.  
 
 
Where SVFs are:
 
 
1.
 
History of SSOs, 
including, but not limited to, those resulting from wet weather, high water table, or fat/oil/grease blockages
. 
2.
 
Sewer pump/lift stations, siphons, or known sanitary sewer restrictions where power/equipment failures or blockages could rea
dily result in SSOs.
 
3.
 
Inadequate sanitary sewer level of service (LOS) resulting in regular surcharging, customer back
-
ups, or frequent customer complaints.
 
4.
 
Common or twin
-
invert manholes serving storm and sanitary sewer alignments.
 
5.
 
Common trench construction serving both storm and sanitary sewer alignments.
 
6.
 
Crossings of storm and sanitary sewer alignments.
 
7.
 
Sanitary sewer alignments known or suspected to have been constructed with an underdrain system;
 
8.
 
Sanitary sewer infrastructure defects such as leaking service laterals, cracked, broken, or offset sanitary infrastructure, d
irectly piped connections between storm drain and 
sanitary sewer infrastructure, or other vulnerability factors identified through Inflow/Infiltration Analyses, Sanitary Sewer Evaluation Surveys, or other infrastructure 
investigations.
 
9.
 
Areas formerly served by combined sewer systems.
 
10.
 
Any sanitary sewer and storm drain infrastructure greater than 40 years old in medium and densely developed areas.
 
11.
 
Widespread code
-
required septic system upgrades required at property transfers (indicative of inadequate soils, water table separation, or ot
her physical constraints of the area 
rather that poor owner maintenance)
. 
12.
 
History of multiple 
local health department or sanitarian
 
actions addressing widespread septic system failures (indicative of inadequate soils, water table separation, or other 
physical constraints of the area rather that poor owner maintenance)
. 
 
3.2 Key junction manhole dry weather screening and sampling data
  
You may also attach a
n excel spreadsheet 
with the same data rather than copying it to this table
. 
If you do attach a spreadsheet, please write “See 
Attachment” below.
 
Key Junction 
Manhole
 
ID
 
Latitude / 
Longitude
 
Screening / 
Sample date
 
Visual/ olfactory 
evidence of illicit 
discharge
 
Ammonia 
 
Chlorine
 
Surfactants 
 
 
 
 
 
 
 

Page 203

 
25
 
The identification of key junction manholes that may narrow the location of suspected 
illicit
 
discharges or SSOs to an isolated pipe 
segment between two manholes, or key junction manholes that may be located or show evidence of illicit discharges or SSOs tha
t may not 
be evident at the outfall 
under all
 
circumstances, or to confirm or identify potential system vulnerability factors is underway. Once 
identified, these key junction manholes will be inspected during dry weather events for evidence of 
illicit
 
discharges or SSOs.
 
 
 
3.3 Wet weather inve
stigation outfall sampling data
  
You may also attach 
an excel spreadsheet
 
with the same data rather than copying it to this table.
 
If you do attach a spreadsheet, please write “See 
Attachment” below.
 
Outfall
 
ID
 
Latitude / 
Longitude
 
Sample date
 
Ammonia 
 
Chlorine
 
Surfactants 
 
 
 
 
 
 
Following the identification of key junction manholes 
during 
dry weather inspections, follow
-
up wet weather 
sampling will be completed where inspections indicate the presence of one or mor
e SVF, SSO, or 
illicit
 
discharge
.
 
 
3.4 Data for each illicit 
discharge source confirmed through the ca
tchment investigation 
procedure.
 
Discharge 
location
 
Source 
location
 
Discharge description
 
Method of 
discovery
 
Date of 
discovery
 
Date of 
eliminatio
n
 
Mitigation or 
enforcement 
action
 
Estimated 
volume of flow 
removed
 
286 W. 
Granby 
Rd (OF
-
152)
 
Undergroud 
spring
 
Atlas was called to investigate a potential illicit discharge 
in the Town. Upon arrival, water was found to be 
discharging from a driveway at a steady, bubbling rate, 
with heavy algae growth. Discharge lead down the 
driveway into an adjacent ditch. This 
runoff 
disch
arge
 
is 
in the vicinity of OF
-
152, which in turn discharges to the 
West Branch Salmon Brook. A sample of the discharge 
was submitted for the analysis of 
E. coli
, T. coli, nitrite, 
nitrate, and phosphorus to assess potential 
illicit
 
discharge 
sour
ces. A review of sampling data from the nearby MS4 
outfall (OF
-
152) did not indicate illicit discharges were 
entering this catchment. Laboratory analytical results 
were indicative of groundwater, and it is suspected an 
underground spring had worked its way
 
to the surface.
 
Citizen 
report 
4/7/
20
21
 
N/A
 
None.
 
N/A
 
80 Canal 
Road
 
Residential 
sump pump
 
A sump pump discharging to the road and running into a 
nearby 
catch basin
, which in turn lead to icy road 
conditions,
 
was reported.
 
Citizen 
report 
2022
 
2022
 
Following 
investigation, 
the Town 
required the 
resident to 
relocate the 
sump pump 
discharge, 
which was 
complied
 
with.
 
Unknown.
 

Page 204

 
26
 
Discharge 
location
 
Source 
location
 
Discharge description
 
Method of 
discovery
 
Date of 
discovery
 
Date of 
eliminatio
n
 
Mitigation or 
enforcement 
action
 
Estimated 
volume of flow 
removed
 
Moose
h
or
n Road
 
Washout 
from shared 
gravel 
driveway
 
It appears that silt, sediment, and gravel from the 
driveway entered the Town’s MS4 system and an 
adjacent stream and can therefore be considered an illicit 
discharge. Washout from the shared driveway at 30, 31, 
33, and 54 Moose
h
orn Road was determined to have been 
the cause of the discharge. No corrective action has been 
done at this time.
 
 
Citizen 
report 
7/18/2023
 
7/21/2023
 
None.
 
Unknown.
 
 
   

Page 205

Page 206

 
 
 
FIGURES 
 
 

Page 207

0 
3,000 
6,000 
9,000 12,000 
--====----=======----
■ 
Feet
East 
artland 
•
•
0 
<9. 
¾ 
Legend 
� 
CJ 
CJ 
Outfall 
Catch 
Basin 
Stormwater 
Manhole 
Impaired 
Waterbody 
Surface 
Water 
� 
.-
%
!
" 
.. 
�
�
'r: 
• 
l 
/-
--
�
;I 
lb.
"/'___,. 
I 
•
---.. 
-
cl 
' 
-
\:r 
_,_ 
, 
..
. 
,
,: 
ii
-:::,..;
<
..._J,
I 
s, 
.J,, 
,,,
}:-¼3 
• 
� 
'7 
� 
� 
-
J .
� 
,.
<f-
� 
�
" 
1 
Main 
Road 
Town-Owned 
Land 
Parcel 
Town 
Line 
I" 
C 
C. 
-, 
Ber 
.:r -, 
-:
j 
Gillett 
h;
-
� 
Corner 
Congamond 
Gran 
brook 
Park 
Simsbury 
Tri-Town 
Airport 
Esri, 
HERE, 
Garmin, 
SafeGraph, 
Geo 
Technologies, 
Inc, 
A'!f-lkj��
SA, 
USGS, 
EPA 
NPS, 
USDA 
. f 
Tan 
Fire 
town 
Town 
of 
Granby
 
2024 
Annual 
Report 
MS4 
System 

Page 208

0 
3,000 
6,000 
9,000 12,000 
--====----=======----
■ 
Feet
East 
artland 
• 
• 
■ 
0 
<9. 
¾ 
Legend 
� 
CJ 
Priority 
Outfalls 
Outfall 
Catch 
Basin 
Stormwater 
Manhole 
Impaired 
Waterbody 
c:::J 
� 
.-
%
!
" 
.. 
�
�
'r: 
• 
l 
/-
--
�
;I 
lb.
"/'___,. 
I 
•
---.. 
-
cl 
' 
-
\:r 
_,_ 
, 
..
. 
,
,: 
ii
-:::,..;
<
..._J,
I 
s, 
.J,, 
,,,
}:-¼3 
• 
� 
'7 
� 
� 
-
J .
� 
,.
<f-
� 
�
" 
1 
Su
r
face 
Water 
Main 
Road 
Town-Owned 
Land 
Parcel 
Town 
Line 
I" 
C. 
-, 
-:
j 
.:r -, 
h;
-
� 
Gillett 
Corner 
Congamond 
Gran 
brook 
Park 
Simsbury 
Tri-Town 
Airport 
C 
Ber 
Esri, 
HERE, 
Garmin, 
SafeGraph, 
Geo 
Technologies, 
Inc, 
A'!f-lkj��
SA, 
USGS, 
EPA 
NPS, 
USDA 
. f 
Tan 
Fire 
town 
Town 
of 
Granby 
2024 
Annual 
Report 
Priority 
Outfalls 

Page 209

0 
12,000 
--====----=======----
■ 
Feet 
3,000 
6,000 
9,000 
East 
artland 
Legend 
1111 
Catchment
 
Impaired 
Waterbody 
Surface 
Water 
Main 
Road 
� 
Town-Owned 
Land
 
CJ 
Parcel 
CJ 
Town 
Line 
Gillett 
Corner 
Congamond 
Gran 
brook 
Park 
Simsbury 
Tri-Town 
Airport 
C 
Ber 
Esri, 
HERE, 
Garmin, 
SafeGraph, 
Geo 
Technologies, 
Inc, 
A'!f-lkj��
SA, 
USGS, 
EPA 
NPS, 
USDA 
. f 
Tan 
Fire 
town 
Town 
of 
Granby 
2024 
Annual 
Report 
Impaired 
Waters 
by 
Catchment 

Page 210

0 
3,000 
6,000 
9,000 12,000 
--====----=======----
■ 
Feet
East 
artland 
1111 
... 
■ 
0 
<9. 
¾ 
Legend 
� 
CJ 
Ur
b
anized 
Area 
Outfall 
Catch 
Basin 
Stormwater 
Manhole 
Impaired 
Waterbody 
c:::J 
� 
.-
%
!
" 
.. 
�
� 
'r: 
• 
l 
/-
--
� 
;I 
lb.
"/'___,. 
I 
•
---.. 
-
cl 
' 
-
\:r 
_,_ 
, 
..
. 
,
,: 
ii
-:::,..; 
<
..._J,
I 
s,
.J,, 
,,,
}:-¼3 
• 
� 
'7 
� 
� 
-
J .
� 
,.
<f-
� 
�
" 
1 
Su
rface 
Water 
Main 
Road 
Town-Owned 
Land 
Parcel 
Town 
Line 
I" 
C. 
-, 
-:
j 
.:r -, 
h;
-
� 
Gillett 
Corner 
Congamond 
Gran 
brook 
Park 
Simsbury 
Tri-Town 
Airport 
C 
Ber 
Esri, 
HERE, 
Garmin, 
SafeGraph, 
Geo 
Technologies, 
Inc, 
A'!f-lkj��
SA, 
USGS, 
EPA 
NPS, 
USDA 
. f 
Tan 
Fire 
town 
Town 
of 
Granby 
2024 
Annual 
Report 
Urbanized 
Areas 
by 
Catchment
 

Page 211

0 
12,000 
--===::::::.---=======----
■ 
Feet 
3,000 
6,000 
9,000 
East 
artland 
Legend 
1111 
Catchment
 
Impaired 
Waterbody 
Surface 
Water 
Main 
Road 
� 
Town-Owned 
Land
 
CJ 
Parcel 
CJ 
Town 
Line 
Gillett 
Corner 
Congamond 
Gran 
brook 
Park 
Simsbury 
Tri-Town 
Airport 
C 
Ber 
Esri, 
HERE, 
Garmin, 
SafeGraph, 
Geo 
Technologies, 
Inc, 
A'!f-lkj��
SA, 
USGS, 
EPA 
NPS, 
USDA 
. f 
Tan 
Fire 
town 
Town 
of 
Granby 
2024 
Annual 
Report 
Prioritized 
Retrofitting 
by 
Catchment 

Page 212

0 
12,000 
--===::::::.---=======----
■ 
Feet 
3,000 
6,000 
9,000 
East 
artland 
� 
CJ 
4319-03-2-R2 
431'}-11-1 
4320-03-1 
4320-05-2-R2 
4320-08-1 
4319-09-1 
\\, 
Legend
 
c::::J 
Town
 
Line 
Priority
 
Ranking 
CJ 
CJ 
Impaired 
Waterbody 
Surface 
Water 
Main 
Road 
Town-Owned 
Land 
Parcel 
CJ 
High 
Priority 
Low 
Priority 
Problem 
/
432 
4001 
0-1* 
4320-17-1 
Five 
Poin 
s 
320-1f-1 
\ � 
4320-00-3-RS 
Breok 
Gillett 
Corner 
Congamond 
4320-00-4-Rl 
� 
319-00-
3-R6
Gran 
brook 
Park 
Simsbury 
Tri-Town 
Airport 
C 
Ber 
Esri, 
HERE, 
Garmin, 
SafeGraph, 
Geo 
Technologies, 
Inc, 
A'!f-lkj��
SA, 
USGS, 
EPA 
NPS, 
USDA 
. f Tan 
Fire 
town 
Town 
of 
Granby 
2024 
Annual 
Report 
Catchment 
Priority 
Rankings 

Page 213

 
 
 
 
SEPTIC REPAIR AND REPLACMENT 
 
 

Page 214

E. Coli 
(MPN/100mL)
Total Coliform  
(MPN/100mL)
OF-13 9/10/2018 Bacteria 20
>24,200
Phoenix 
Environmental
Yes -72.784375 41.9578399
OF-14 9/10/2018 Bacteria
>24,200 >24,200
Phoenix 
Environmental
Yes -72.780682 41.9570748
OF-15 9/10/2018 Bacteria
269 >24,200
Phoenix 
Environmental
Yes -72.77988 41.955557
OF-73 9/10/2018 Bacteria
6,870 >24,200
Phoenix 
Environmental
Yes -72.821732 41.9901248
OF-74 9/10/2018 Bacteria
13,000 >24,200
Phoenix 
Environmental
Yes -72.820082 41.9842248
OF-102 9/10/2018 Bacteria
9,210 >24,200
Phoenix 
Environmental
Yes -72.806849 41.9815081
OF-103 9/10/2018 Bacteria
12,000 >24,200
Phoenix 
Environmental
Yes -72.805525 41.9702553
OF-104 9/10/2018 Bacteria
4,880 >24,200
Phoenix 
Environmental
Yes -72.804936 41.9703202
OF-105 9/10/2018 Bacteria
9,210 >24,200
Phoenix 
Environmental
Yes -72.80428 41.9703214
OF-13 12/28/2018 Bacteria
4,110 7,270
Phoenix 
Environmental
Yes -72.784375 41.9578399
OF-14 12/28/2018 Bacteria
>24,200 >24,200
Phoenix 
Environmental
Yes -72.780682 41.9570748
OF-15 12/28/2018 Bacteria 10
8,660
Phoenix 
Environmental
Yes -72.77988 41.955557
OF-44 12/28/2018 Bacteria 10
2,910
Phoenix 
Environmental
Yes -72.835466 41.9501248
OF-73 12/28/2018 Bacteria
256 9,210
Phoenix 
Environmental
Yes -72.821732 41.9901248
OF-74 12/28/2018 Bacteria 10
17,300
Phoenix 
Environmental
Yes -72.820082 41.9842248
OF-86 12/28/2018 Bacteria 10
1,620
Phoenix 
Environmental
Yes -72.834279 41.9418247
OF-102 12/28/2018 Bacteria 41
1,790
Phoenix 
Environmental
Yes -72.806849 41.9815081
OF-103 12/28/2018 Bacteria 120
5,480
Phoenix 
Environmental
Yes -72.805525 41.9702553
OF-104 12/28/2018 Bacteria 10
14,100
Phoenix 
Environmental
Yes -72.804936 41.9703202
OF-105 12/28/2018 Bacteria 10
>2,610
Phoenix 
E
nvir
onmental
Yes -72.80428 41.9703214
OF-109 12/28/2018 Bacteria
433
17,300
Phoenix 
Environmental
Yes -72.871866 41.9738414
OF-152 12/28/2018 Bacteria
10
1,840
Phoenix 
Environmental
Yes -72.843599 41.9558581
OF-153 12/28/2018 Bacteria
10
8,160
Phoenix 
Environmental
Yes -72.843416 41.9551414
OF-154 12/28/2018 Bacteria
20
305
Phoenix 
Environmental
Yes -72.841149 41.9533081
OF-155 12/28/2018 Bacteria
20
11,200
Phoenix 
Environmental
Yes -72.837582 41.9490248
OF-103/104 12/28/2018 Bacteria
216
4,350
Phoenix 
Environmental
Yes -72.805525 41.9702553
Stream 3/19/2020 Bacteria
201
2,490
Phoenix 
Environmental
Yes -- --
OF-103/104 3/19/2020 Bacteria
31
1,920
Phoenix 
Environmental
Yes -72.805525 41.9702553
Stream 3/19/2020 Bacteria
563
17,300
Phoenix 
Environmental
Yes -- --
OF-102 3/19/2020 Bacteria
<10
8,660
Phoenix 
Environmental
Yes -72.806849 41.9815081
2020
Town of Granby
2018-2024
Results
Outfall ID
Inspection 
Date
Pollutant Parameter 
(Nitrogen, Phosphorous, 
Bacteria, Other)
 Laboratory 
Follow-Up 
Required?
Longitude Latitude
Wet Weather Sampling
2018
Outfalls to Impaired Waterbodies

Page 215

E. Coli 
(MPN/100mL)
Total Coliform  
(MPN/100mL)
Town of Granby
2018-2024
Results
Outfall ID
Inspection 
Date
Pollutant Parameter 
(Nitrogen, Phosphorous, 
Bacteria, Other)
 Laboratory 
Follow-Up 
Required?
Longitude Latitude
Wet Weather Sampling
Outfalls to Impaired Waterbodies
OF-103 3/19/2020 Bacteria
798 19,900
Phoenix 
Environmental
Yes -72.805525 41.9702553
OF-104 3/19/2020 Bacteria 20
12,000
Phoenix 
Environmental
Yes -72.804936 41.9703202
OF-14 3/19/2020 Bacteria 10
3,650
Phoenix Yes -72.780682 41.9570748
OF-153 3/19/2020 Bacteria 10
13,000
-72.84341555 41.95514142
OF-15 3/19/2020 Bacteria 233
14,100
-72.77987999 41.95555698
OF-13 3/19/2020 Bacteria 20
3,650
-72.78437469 41.95783989
OF-86 3/19/2020 Bacteria
<10 6,490
-72.83427937 41.94182471
OF-74 3/19/2020 Bacteria 20
8,660
-72.82008222 41.98422475
OF-73 3/19/2020 Bacteria 20
4,880
-72.82173222 41.99012475
OF-109 3/19/2020 Bacteria
2,480 4,110
-72.87186554 41.97384142
OF-155 3/19/2020 Bacteria
249 2,600
-72.83758222 41.94902476
OF-152 9/10/2020 Bacteria
5,790 >24,200
-72.84359888 41.95585809
OF-44 9/10/2020 Bacteria 110
7,270
-72.83546555 41.95012476
OF-14 9/10/2020 Bacteria 173
>24,200
-72.78068224 41.95707475
OF-15 9/10/2020 Bacteria
389 >24,200
-72.77987999 41.95555698
OF-73 9/10/2020 Bacteria
860 >24,200
-72.82173222 41.99012475
OF-74 9/10/2020 Bacteria 122
>24,200
-72.82008222 41.98422475
OF-102 9/10/2020 Bacteria 30
>24,200
-72.80684889 41.98150808
OF-103 9/10/2020 Bacteria 74
>24,200
-72.80552466 41.97025533
OF-104 9/10/2020 Bacteria 20
>24,200
-72.80493613 41.9703202
OF-153 3/19/2020 Bacteria 10
13,000
Phoenix 
Environmental
Yes -72.77988 41.955557
OF-15 3/19/2020 Bacteria 233
14,100
Phoenix 
Environmental
Yes -72.784375 41.9578399
OF-13 3/19/2020 Bacteria 20
3,650
Phoenix 
Environmental
Yes -72.834279 41.9418247
OF-86 3/19/2020 Bacteria
<10 6,490
Phoenix 
Environmental
Yes -72.820082 41.9842248
OF-74 3/19/2020 Bacteria 20
8,660
Phoenix 
Environmental
Yes -72.821732 41.9901248
OF-73 3/19/2020 Bacteria 20
4,880
Phoenix 
Environmental
Yes -72.871866 41.9738414
OF-109 3/19/2020 Bacteria
2,480 4,110
Phoenix 
Environmental
Yes -72.837582 41.9490248
OF-155 3/19/2020 Bacteria
249 2,600
Phoenix 
E
nvir
onmental
Yes -72.843599 41.9558581
OF-152 9/10/2020 Bacteria
5,790
>24,200
Phoenix 
Environmental
Yes -72.835466 41.9501248
OF-44 9/10/2020 Bacteria
110
7,270
Phoenix 
Environmental
Yes -72.780682 41.9570748
OF-14 9/10/2020 Bacteria
173
>24,200
Phoenix 
Environmental
Yes -72.77988 41.955557
2020

Page 216

E. Coli 
(MPN/100mL)
Total Coliform  
(MPN/100mL)
Town of Granby
2018-2024
Results
Outfall ID
Inspection 
Date
Pollutant Parameter 
(Nitrogen, Phosphorous, 
Bacteria, Other)
 Laboratory 
Follow-Up 
Required?
Longitude Latitude
Wet Weather Sampling
Outfalls to Impaired Waterbodies
OF-15 9/10/2020 Bacteria
389 >24,200
Phoenix 
Environmental
Yes -72.821732 41.9901248
OF-73 9/10/2020 Bacteria
860 >24,200
Phoenix Yes -72.820082 41.9842248
OF-74 9/10/2020 Bacteria 122
>24,200
Phoenix 
Environmental
Yes -72.806849 41.9815081
OF-102 9/10/2020 Bacteria 30
>24,200
Phoenix 
Environmental
Yes -72.805525 41.9702553
OF-103 9/10/2020 Bacteria 74
>24,200
Phoenix 
Environmental
Yes -72.804936 41.9703202
OF-104 9/10/2020 Bacteria 20
>24,200
Phoenix 
Environmental
Yes -72.804936 41.9703202
OF-14 9/1/2021 Bacteria
813 >24,200
Phoenix 
Environmental
Yes -72.780682 41.9570748
OF-15 9/1/2021 Bacteria
1,430 >24,200
Phoenix 
Environmental
Yes -72.77988 41.955557
OF-73 9/1/2021 Bacteria
24,200 >24,200
Phoenix 
Environmental
Yes -72.821732 41.9901248
OF-74 9/1/2021 Bacteria
1,400 >24,200
Phoenix 
Environmental
Yes -72.820082 41.9842248
OF-102 9/1/2021 Bacteria
1,790 >24,200
Phoenix 
Environmental
Yes -72.806849 41.9815081
OF-103 9/1/2021 Bacteria
3,450 >24,200
Phoenix 
Environmental
Yes -72.805525 41.9702553
OF-104 9/1/2021 Bacteria
2,380 >24,200
Phoenix 
Environmental
Yes -72.804936 41.9703202
OF-105 9/1/2021 Bacteria
7,700 >24,200
Phoenix 
Environmental
Yes -72.80428 41.9703214
OF-14 9/22/2022 Bacteria
>24,200 >24,200
Phoenix 
Environmental
Yes -72.780682 41.9570748
OF-15 8/22/2022 Bacteria
17,300 >24,200
Phoenix 
Environmental
Yes -72.77988 41.955557
OF-73 9/22/2022 Bacteria
>24,200 >24,200
Phoenix 
Environmental
Yes -72.821732 41.9901248
OF-74 8/22/2022 Bacteria
712 >24,200
Phoenix 
Environmental
Yes -72.820082 41.9842248
OF-102 8/22/2022 Bacteria
>24,200 >24,200
Phoenix 
Environmental
Yes -72.806849 41.9815081
OF-103 9/22/2022 Bacteria
6,130 >24,200
Phoenix 
Environmental
Yes -72.805525 41.9702553
OF-104 8/22/2022 Bacteria
>24,200 >24,200
Phoenix 
Environmental
Yes
-
72.804936 41.9703202
OF-105 8/22/2022 Bacteria
9,210
>24,200
Phoenix 
Environmental
Yes -72.80428 41.9703214
OF-14 8/25/2023 Bacteria
4,880
>24,000
Phoenix 
Environmental 
Laboratories, Inc.
Yes -72.780682 41.9570748
OF-15 8/25/2023 Bacteria
1,290
>24,000
Phoenix 
Environmental 
Laboratories, Inc.
Yes -72.77988 41.955557
OF-102 8/25/2023 Bacteria
2,010
>24,000
Phoenix 
Environmental 
Laboratories, Inc.
Yes -72.806849 41.9815081
OF-103 8/25/2023 Bacteria
2,610
>24,000
Phoenix 
Environmental 
Laboratories, Inc.
Yes -72.805525 41.9702553
2023
2021
2020
2022

Page 217

E. Coli 
(MPN/100mL)
Total Coliform  
(MPN/100mL)
Town of Granby
2018-2024
Results
Outfall ID
Inspection 
Date
Pollutant Parameter 
(Nitrogen, Phosphorous, 
Bacteria, Other)
 Laboratory 
Follow-Up 
Required?
Longitude Latitude
Wet Weather Sampling
Outfalls to Impaired Waterbodies
OF-104 8/25/2023 Bacteria
19,900 >24,000
Phoenix 
Environmental 
Laboratories, Inc.
Yes -72.804936 41.9703202
OF-150 8/25/2023 Bacteria
11,200 >24,000
Phoenix 
Environmental 
Laboratories, Inc.
Yes -72.80428 41.9703214
OF-14 9/18/2023 Bacteria
19,900 >24,200
Phoenix 
Environmental 
Laboratories, Inc.
Yes -72.780682 41.9570748
OF-15 9/18/2023 Bacteria
2,920 >24,200
Phoenix 
Environmental 
Laboratories, Inc.
Yes -72.77988 41.955557
OF-73 9/18/2023 Bacteria
520 >24,200
Phoenix 
Environmental 
Laboratories, Inc.
Yes -72.821726 41.990151
OF-74 9/18/2023 Bacteria
1,970 >24,200
Phoenix 
Environmental 
Laboratories, Inc.
Yes -72.820065 41.984247
OF-102 9/18/2023 Bacteria
1,990 >24,200
Phoenix 
Environmental 
Laboratories, Inc.
Yes -72.806849 41.9815081
OF-103 9/18/2023 Bacteria
24,200 >24,200
Phoenix 
Environmental 
Laboratories, Inc.
Yes -72.805525 41.9702553
OF-104 9/18/2023 Bacteria
842 >24,200
Phoenix 
Environmental 
Laboratories, Inc.
Yes -72.804936 41.9703202
OF-105 9/18/2023 Bacteria
6,490 >24,200
Phoenix 
Environmental 
Laboratories, Inc.
Yes -72.80428 41.9703214
OF-14 11/21/2024 Bacteria 155
>24,200
Phoenix 
Environmental 
Laboratories, Inc.
Yes -72.780682 41.9570748
OF-15 11/21/2024 Bacteria
3,650 >24,200
Phoenix 
Environmental 
Laboratories, Inc.
Yes -72.77988 41.955557
OF-73 11/21/2024 Bacteria 144
5,790
Phoenix 
Environmental 
Laboratories, Inc.
Yes -72.821726 41.990151
OF-74 11/21/2024 Bacteria 109
>24,200
Phoenix 
Environmental 
Laboratories, Inc.
Yes -72.820065 41.984247
OF-102 11/21/2024 Bacteria
>24,200 >24,200
Phoenix 
Environmental 
Laboratories, Inc.
Yes -72.806849 41.9815081
OF-103 11/21/2024 Bacteria 213
>24,200
Phoenix 
Environmental 
Laboratories, Inc.
Yes -72.805525 41.9702553
OF-104 11/21/2024 Bacteria 231
>24,200
Phoenix 
Environmental 
Laboratories, Inc.
Yes -72.804936 41.9703202
OF
-
109 11/21/2024 Bacteria
>17,300
>24,200
Phoenix 
Environmental 
Laboratories, Inc.
Yes -72.871866 41.973841
2023
2024
*Highlighting is based on the following criteria;
* All highlighted bacterial concentrations are required for follow-up investigations. 
Notes:
2. Total Coliform > 500 col/100mL
1. E. Coli  >235/100mL for Swimming Areas, and >410 col/100mL for all others.

Page 218

 
 
 
 
WET WEATHER SAMPLING OUFALLS TO IMPAIRED WATERBODIES 
 
 

Page 219

Method used to Track 
Septic 
Repairs/Replacements
Address 
Reason for 
Evaluation/Replacement
Actions Taken
Impacted Waterbody or 
Watershed
Department Responsible 
Farmington Valley Health 
District (FVHD)
3 Hampton Village Drive
Unknown
Septic tank replacement 
only.
None
FVHD
Farmington Valley Health 
District (FVHD)
15 Woodland Drive
Unknown
Full system replacement.
None
FVHD
Farmington Valley Health 
District (FVHD)
176 Lost Acres Road
Unknown
Full system replacement.
None
FVHD
Farmington Valley Health 
District (FVHD)
18 Kearns Circle
Unknown
Full system replacement.
None
FVHD
Farmington Valley Health 
District (FVHD)
32 Zimmer Road
Unknown
Full system replacement.
None
FVHD
Farmington Valley Health 
District (FVHD)
210 Barn Door Hills Road
U
nknown
Soil testing done.
None
FVHD
Farmington Valley Health 
District (FVHD)
250 Barkhamstead Road
Overflow
Soil testing done.
None
FVHD
Farmington Valley Health 
District (FVHD)
109 Bushy Hill Road
Unknown
Full 
system replacement.
None
FVHD
Farmington Valley Health 
District (FVHD)
17 Stardust Drive
Unknown
Soil testing done.
None
FVHD
Farmington Valley Health 
District (FVHD)
22R Intervale
Unknown
Septic tank replacement 
only.
None
FVHD
Farmington Valley Health 
District (FVHD)
330 North Granby Road
Unknown
Full system replacement.
None
FVHD
Farmington Valley Health 
District (FVHD)
24 Heather Lane
Unknown
Septic tank replacement 
only.
None
FVHD
Farmington Valley Health 
District (FVHD)
6 Pine Hill Road
Unknown
Septic tank replacement 
only.
None
FVHD
Farmington Valley Health 
District (FVHD)
189 Day Street
Unknown
Soil testing done.
None
FVHD
Farmington Valley Health 
District (FVHD)
58 Barn Door Hills Road
Unknown
Septic tank replacement 
only.
None
FVHD
Farmington Valley Health 
District (FVHD)
473 Salmon Brook Street
Unknown
Full system replacement.
None
FVHD
Farmington Valley Health 
District (FVHD)
4 Pond Lane
Unknown
Septic tank replacement 
only.
None
FVHD
Farmington Valley Health 
District (FVHD)
63 Higley Road
Unknown
Septic tank replacement 
only.
None
FVHD
Farmington Valley Health 
District (FVHD)
39 Strong Road
Unknown
Full system replacement.
None
FVHD
Farmington Valley Health 
District (FVHD)
96 West Granby Road
Unknown
Septic tank replacement 
only.
None
FVHD
Farmington Valley Health 
District (FVHD)
68 Canal Road
Unknown
Septic tank replacement 
only.
None
FVHD
Farm
ington Valley Health 
Di
strict (FVHD)
11 Rondure Road
Unknown
Septic tank replacement 
only.
None
FVHD
Farmington Valley Health 
District (FVHD)
146 North Granby Road
Unknown
Soil testing done.
None
FVHD
Farmington Valley Health 
District (FVHD)
22 Pendleton Road
Unknown
Septic tank replacement 
only.
None
FVHD
Farmington Valley Health 
District (FVHD)
20 Peterson Road
Unknown
Full system replacement.
None
FVHD
Farmington Valley Health 
District (FVHD)
35 Shelley Drive
Unknown
Full system replacement.
None
FVHD
Farmington Valley Health 
District (FVHD)
5 Nestor Way
Unknown
Full system replacement.
None
FVHD
Town of Granby
Septic Repair and Replacement 
2023-2024
2023

Page 220

Method used to Track 
Septic 
Repairs/Replacements
Address 
Reason for 
Evaluation/Replacement
Actions Taken
Impacted Waterbody or 
Watershed
Department Responsible 
Town of Granby
Septic Repair and Replacement 
2023-2024
Farmington Valley Health 
District (FVHD)
45 East Granby Road
Leach field failing, system 
50+ years old. 
Full system replacement.
None
FVHD
Farmington Valley Health 
District (FVHD)
68 Kelly Lane
 Strong odor when it rained, 
leaching field failing. 
Full system replacement.
None
FVHD
Farmington Valley Health 
District (FVHD)
24 Simmer Road Age of septic system (tank).
Septic tank replacement 
only.
None
FVHD
Farmington Valley Health 
District (FVHD)
3 Douglas Drive 
Flooded system. Full system replacement.
None
FVHD
Farmington Valley Health 
District (FVHD)
14 Harvey Drive 
Increase capacity of drainage 
field.
Full system replacement.
None
FVHD
Farmington Valley Health 
District (FVHD)
154 Canton Road
Following a septif insepction 
(2023) that recommended 
tank replacement.
Full system replacement.
None
FVHD
Farmington Valley Health 
District (FVHD)
18 Old Simsbury Road . 
Corrosion and cracks on tank 
.
Septic tank replacement 
only.
None
FVHD
Farmington Valley Health 
District (FVHD)
35 Cooley Road
Leaching field failing, 
ponding observed with 
effluent. 
Full system replacement.
None
FVHD
Farmington Valley Health 
District (FVHD)
220 Broad Hill Road Age of septic system. Full system replacement.
None
FVHD
Farmington Valley Health 
District (FVHD)
1 East View Drive 
Unknown
Full system replacement.
None
FVHD
Farmington Valley Health 
District (FVHD)
511 Salmon Brook Street Real-estate Inspection Full system replacement.
None
FVHD
Farmington Valley Health 
District (FVHD)
9 Morningside Drive Age of septic system. Full system replacement.
None
FVHD
Farmington Valley Health 
District (FVHD)
10 Wells Road 
New house addition. Septic pipe replacement. 
None
FVHD
Farmington Valley Health 
District (FVHD)
31 East Street
Tank cracked.
Septic tank replacement 
only.
None
FVHD
Farmington Valley Health 
District (FVHD)
22 High ridge 
Connect addition to existing 
tank
Septic pipe replacement.
None
FVHD
Farmington Valley Health 
District (FVHD)
85 Higley Road Age of septic system. Full system replacement.
None
FVHD
Farmington Valley Health 
District (FVHD)
15 Basile Road 
Tank cracked.
Septic tank replacement 
only.
None
FVHD
Farmington Valley Health 
District (FVHD)
19 Intervale Road Age of septic system. 
Septic tank replacement 
only.
None
FVHD
Farmington Valley Health 
District (FVHD)
18 Candlewood Lane Failed inspection
Septic tank replacement 
only.
None
FVHD
Farmington Valley Health 
District (FVHD)
52 Spring Glen Road 
Existing plastic tank 
damaged.
S
e
ptic tank replacement 
only.
None
FVHD
Farmington Valley Health 
District (FVHD)
14 Old Simsbury Road Failed inspection.
Septic tank replacement 
only.
None
FVHD
Farmington Valley Health 
District (FVHD)
122 East Street 
Septic system repair 
evaluation
Septic repair evaluation – 
replace tank.
None
FVHD
Farmington Valley Health 
District (FVHD)
24 Pendelton Road Old metal tank collapsed. 
Septic tank replacement 
only.
None
FVHD
Farmington Valley Health 
District (FVHD)
45 Barkhamsted Road Failed inspection
Septic repair evaluation – 
replace tank.
None
FVHD
Farmington Valley Health 
District (FVHD)
57 Silkey Road
Age of septic system. 
Evaluated for septic system 
repair 
None
FVHD
Farmington Valley Health 
District (FVHD)
11 Brianwood Drive Failed inspection. 
Evaluated for septic system 
repair
None
FVHD
2024

Page 221

 
 
 
 
DRY WEATHER INSPECTIONS 
 
 

Page 222

Number Outfall ID
Inspection 
Date
Material Subtype
Diameter 
(Inches)
Condition
Erosion 
Control
Notes Illicit Discharge
Illicit 
Discharge 
Flow Type
Illicit 
Discharge 
Description
Sample 
Collection
Longitude Latitude
1
OF-104 
(1103)
8/23/2018 HDPE Pipe 24 Good Good 
Riprap on enbankment. 
Observed low flow with clear 
discahrge. Good erosion 
control.
No -- -- -- -72.804936 41.97032
2
OF-105 
(1107)
8/23/2018 Concrete Flared End 15 Poor Poor
Observed low flow with clear 
discahrge. Road near outfall is 
eroding 
No -- -- -- -72.80428 41.970321
3
OF-103 
(1102)
8/23/2018 HDPE Flared End 24 Good Good 
Riprap on enbankment. 
Observed low flow with clear 
discahrge. Good erosion 
control.
No -- -- -- -72.805525 41.970255
4
OF-172 
(1748)
8/23/2018 Concrete Pipe 15 Good Good 
Concrete pipe to rip rap, good 
erosion control. Dry observed 
receiving stream to be dry as 
well. 
No -- -- -- -72.802716 41.983125
5
OF- 171 
(1744)
8/23/2018 -- -- -- -- --
Outfall loacted on residential 
property. Did not access 
outfall. 
No --
--
-- -72.803066 41.983975
6
OF-102 
(1099)
8/23/2018 HDPE Pipe 24 Good Good 
Two 4' pipes inserted into wall 
on bridge over Salmon Brook. 
Dry with adeqyate erosion 
control. 
No --
--
-- -72.806849 41.981508
7 OF-74 (781) 8/23/2018 -- -- -- -- --
Unable to locate outfall. 
Located on a farm that likely 
uses manure as fertilizer. 
No --
--
-- -72.820082 41.984225
8 OF-73 (776) 8/23/2018 Concrete 
Flared End 15 Fair Fair 
No discharge observed during 
inspection. Outfall partially 
clogged. Some erosion 
controll (stones) present. 
Direct discharge to Dismal 
Brook. 
No --
--
-- -72.821732 41.990125
9 OF-13 (190) 8/23/2018 Concrete Pipe -- Good Good 
No discharge observed during 
inspection. Outfall imbedded 
in mason wall. 
No --
--
-- -72.784375 41.95784
10 OF-14 (195) 8/23/2018
Corrugated 
Metal 
Pipe -- Fair Fair 
Some erosion control present, 
no rip-rap. Heavily covered in 
vegetation. 
No --
--
-- -72.780682 41.957075
11 OF-15 (198) 8/23/2018 Concrete Pipe 15 Fair Fair 
Directly discharges into 
Salmon Brook. 
No --
--
-- -72.77988 41.955557
12
OF-152
3/27/2020 -- -- -- Poor Poor Outfall clogged with leaves. No 
--
--
-- -72.843478 41.954902
13
OF-103 
(1102)
3/27/2020 HDPE Pipe 24 Good Good 
Overall good condition, 
discharges directly into 
surface water body
No --
--
-- -72.805525 41.970255
14
OF-104 
(1103)
3/27/2020 HDPE Pipe 24 Good Good 
Overall good condition, 
discharges directly into 
surface water body
No --
--
-- -72.804936 41.97032
15 OF-13 (190) 3/27/2020 Concrete Pipe 24 Good Fair 
Down steep embankment, 
underneath road, moderately 
vegetated. Murky biological 
sheen present. 
No --
--
-- -72.784524 41.958427
16 OF-14 (195) 3/27/2020
Corrugated 
Metal 
Pipe 48 Good Fair 
48” corrugated metal pipe, 
minor damage – still suitable 
for sampling, leaf litter in 
outfall
No --
--
-- -72.780895 41.9573744
17 OF-15 (198) 3/27/2020 Concre
te Pipe 24 Good Fair 
24” concrete channel 
discharging directly into 
Salmon Brook, overall good 
condition, mild erosion 
observed.
No --
--
-- -72.779869 41.955479
18 OF-44 3/27/2020
Corrugated 
Metal 
Pipe 24 Good Good 
24” pipe diameter, overall 
good condition, discharging 
directly into surface water
No --
--
-- -72.835542 41.9500315
19 OF-86 3/27/2020 Concrete Flared End -- Good Fair 
Discharges to retention pond, 
leaf litter in outfall 
No --
--
-- -72.834055 41.9418036
2018
2020
Town of Granby
Dry Weather Inspections 
2018  -2024

Page 223

Number Outfall ID
Inspection 
Date
Material Subtype
Diameter 
(Inches)
Condition
Erosion 
Control
Notes Illicit Discharge
Illicit 
Discharge 
Flow Type
Illicit 
Discharge 
Description
Sample 
Collection
Longitude Latitude
Town of Granby
Dry Weather Inspections 
2018  -2024
21 OF-109 3/27/2020 Concrete Pipe 16 Good Good 
Discharges into rip-rap, 
overall good condition 
No -- -- -- -72.871956 41.9738534
22 OF-153 3/27/2020 Concrete Flared End 16 Good Good 
Discharges into rip-rap, 
overall good condition 
No -- -- -- -72.843478 41.954902
23 OF-155 3/27/2020 HDPE Pipe 16 Poor Poor
Silt in outfall, adjacent to 
bridge. 
No -- -- -- -72.837496 41.9489254
24 OF-74 (781) 3/27/2020 Manhole -- -- Good N/A
Storwmater manhole, no 
discharge, overall good 
condition 
No -- -- -- -72.819988 41.9839482
25 OF-73 (776) 3/27/2020 Concrete
 Flared End 15 Poor Poor
Behind landscaped residential 
homes, significant erosion 
observed, outfall silted in
No -- -- -- -72.821936 41.9900326
26
OF-102 
(1099)
3/27/2020 HDPE Pipe 24 Good Good 
24" diameter pipe, overall 
good condition 
No -- -- -- -72.806861 41.9839482
27 OF-105 3/27/2020 -- -- -- Poor Poor
Outfall silted in, significant 
leaf litter in outfall, pipe 
potentially damaged. 
No -- -- -- -72.804338 41.9702263
28 OF-62 11/15/22 Concrete Other 24 Excellent Good
Concrete culvert in riprap 
swale going through 
residential yards. Adjacent to 
farm. Recieves sheetflow, 
which in turn channelizes off 
of roadway. Gravel driveway 
adjacent to culvert. 
No No -- -- -72.81805 41.9678674
29 OF-106 11/15/22 Concrete End Wall 18 Good Poor
Concrete discharge pipe 
leading to wooded swale, 
culverted by asphalt paved 
road. Adjacent to HDPE 
Flared End pipe buried in leaf 
litter. Minimal riprap, mostly 
covered in leaf litter.
Maintenance-
leaf litter 
removal.
No -- -- -72.814277 41.9725434
30 OF-164 11/15/22 HDPE Flared End 12 Fair Fair
HDPE Flared End within 
riprap swale. In residential 
wooded area, discharges to 
pond.
No No -- -- -72.815631 41.9613
31 OF-165 11/15/22 HDPE Flared End 12 Fair Poor
HDPE Flared End. Minimum 
riprap at head of outfall-
discharges to pond. 
Significant erosion of riprap 
going towards pond in 
residential area. 
Erosion Control No -- -- -72.816198 41.961225
32 OF-105 11/15/22 Concrete Other 12 Poor Poor
Discharges to gravel filled 
swale. No riprap and buried in 
leaf litter.
Erosion Control 
and maintenance
-
leaf litter 
removal.
No -- -- -72.804313 41.970324
33 OF-3 11/15/22 Concrete Flared End 12 Good Excellent
Concrete Flared End , 
discharges immediately into 
man-made pond in residential 
area. Well mulched-may see 
erosion of mulch during a 
significant storm event.
Erosion Control No -- -- -72.800991 41.9661245
34 OF-4 11/15/22 Concrete Flared End 18 Good Excellent
Concrete pipe discharging 
water from man-made pond to 
wooded swale/stream. Riprap 
at exit point of pipe to 
approximately 15 feet away. 
Residential driveway culverts 
outfall. 
No
No
--
-- -72.80022 41.9661725
2022
2020

Page 224

Number Outfall ID
Inspection 
Date
Material Subtype
Diameter 
(Inches)
Condition
Erosion 
Control
Notes Illicit Discharge
Illicit 
Discharge 
Flow Type
Illicit 
Discharge 
Description
Sample 
Collection
Longitude Latitude
Town of Granby
Dry Weather Inspections 
2018  -2024
36 OF-133 11/15/22 Concrete Flared End 18 Good Good
Concrete pipe discharging to 
stream in woods behind 
residential neighborhood. 
Riprap from discharge point to 
approximately 20 feet 
downstream. Potential leaf 
litter and debris blockage 
downstream.
Maintenance-
leaf litter 
removal.
No -- -- -72.823886 41.9447367
37 OF-13 11/15/22 Concrete End Wall 36 Good Excellent
Discharge infiltrates into 
ground. Concrete retaining 
wall on right side of outfall. 
No riprap. 
No No -- -- -72.784358 41.9578259
38 OF-14 11/15/22
Corrugated 
Metal
Other 36 Poor Poor
Discharges to intermittent 
stream with heavy sediment. 
Large hole in piping end due 
to rust. Poor erosion control. 
Residential area. 
Erosion Control 
and maintenance
-
check integrity 
of piping
No -- -- -72.779662 41.9559251
39 OF-15 11/15/22 Concrete End Wall 18 Good Good
Culvert by road receiving 
channelized sheetflow in 
residential area. Riprap on 
both sides of pipe. 
No No -- -- -72.779548 41.9553519
40 OF-95 11/15/22 Concrete End Wall 24 Good Poor
Discharge to intermittent 
stream. Located in residential 
area. No erosion control 
Erosion Control No -- -- -72.776936 41.9551268
41 OF-136 11/15/22 Concrete Flared End 18 Fair Fair
Discharges to wooded area-
significant gully from 
discharge. Riprap from outfall 
to 10ft out. Residential area. 
Erosion Control No -- -- -72.77736 41.963283
42 OF-47 11/15/22 Concrete Flared End 18 Good Fair
Discharge into wooded area. 
Some riprap at head of 
culvert, none on sides. 
Significant sediment loading. 
Residential area.
Erosion Control 
and maintenance
-
sediment loading 
from connected 
infrastructure.
No -- -- -72.780723 41.9631451
43 OF-46 11/15/22 -- -- -- Poor Poor
Outfall covered by organic 
debris. Discharges to wooded 
area with significant ponding. 
No erosion control.
Erosion control 
and maintenance
-
organic debris 
removal.
No -- -- -72.780766 41.9649047
44 OF-123 11/15/22
Corrugated 
Metal
Flared End 30 Poor Good
Riprap at head of outfall, 
discharges to a ravine in 
wooded residential area. 
Minor hole inside piping 
caused by rust.
Maintenance-
inspect full 
integrity of 
piping.
No -- -- -72.785678 41.9644835
45 OF-90 11/15/22 HDPE Flared End 36 Good Good
HDPE pipe discharges to 
detention pond in wooded 
area. Riprap around detention 
basin- overflow appears to 
exit into adjacent area.
No No -- -- -72.77933 41.9763496
46 OF-9 11/15/22 Concrete Flared End 12 Fair Poor
Filled with leaves and debris. 
Discharges into residential 
yard. Located at end of road. 
No erosion control. 
Erosion Control 
and Maintenance
-
removal of 
leaves and 
debris.
No -- -- -72.78385 41.9730833
47 OF-182 11/15/22 Concrete Flared End 36 Good Excellent
Concrete pipe with metal 
Flared End discharging to 
riprap swale and into river 
nearby. Located in wooded 
area to the rear of a residential 
property.
No No -- -- -72.7849 41.9723333
48 OF-10 11/15/22 Concrete Other 144 Excellent Good
Outfall flows through 
footbridge in residential area, 
leads to stream with moderate 
flow. 
No No -- -- -72.784515 41.9731495
49 OF-181 11/15/22 Concrete Flared End 12 Fair Poor
Filled with leaves and debris. 
No erosion control. 
Discharges into woods in 
residential area.
No No -- -- -72.783183 41.97195
2022

Page 225

Number Outfall ID
Inspection 
Date
Material Subtype
Diameter 
(Inches)
Condition
Erosion 
Control
Notes Illicit Discharge
Illicit 
Discharge 
Flow Type
Illicit 
Discharge 
Description
Sample 
Collection
Longitude Latitude
Town of Granby
Dry Weather Inspections 
2018  -2024
51 OF-111 11/21/22 -- -- -- -- --
Outfall located in residential 
property
Will need access 
granted.
No -- -- -72.873967 41.9747667
52 OF-110 11/21/22 -- -- -- -- --
Outfall located in residential 
yard
Will need access 
granted.
No -- -- -72.87335 41.9741167
53 OF-112 11/21/22 -- -- -- -- --
Outfall located in residential 
yard
Will need access 
granted.
No -- -- -72.8756 41.97565
54 OF-27 11/21/22 Other Other 60 Excellent Excellent
Drainage swale in wooded 
area parallel to road. 
Residential neighborhood. 
Excellent riprap on both sides 
of swale. Water is clear and 
iced over at time of 
inspection. 
No No -- -- -72.859233 41.9914167
55 OF-28 11/21/22 HDPE Flared End 12 Excellent Excellent
HDPE outfall in wooded area 
of residential home; riprap on 
either side of drainage 
location and on top of outfall; 
drainage location shows signs 
of sediment loading.
Maintenance-
potential 
sediment loading 
from connecting 
infrastrurcture. 
Further 
investigation 
needed.
No -- -- -72.854983 41.99
56 OF-29 11/21/22 -- -- -- -- --
Out all located in residential 
yard
Will need access 
granted.
No -- -- -72.853867 41.9895167
57 OF-30 11/21/22 -- -- -- Poor Good
Outfall covered in leaves and 
debris; '-- outfall type; appears 
to flow into area with 
adequate riprap on either side 
and above; located between 
two residential homes in 
wooded area.
Maintenance-
leaf and debris 
removal.
No -- -- -72.85265 41.9888
58 OF-38 11/21/22 HDPE Flared End 12 Good Fair
HDPE outfall in wooded area 
at end of road; no riprap; 
discharge flows over moss and 
wooded features; boulders at 
base of discharge area; 
discharge area indicates 
sediment loading. 
Maintenance-
potential 
sediment loading 
from connecting 
infrastrurcture. 
Further 
investigation 
needed.
No -- -- -72.857717 41.9871667
59 OF-37 11/21/22 HDPE Flared End 12 Excellent Excellent
HDPE outfall in wooded area 
between two residential 
homes; stones at base of 
outfall and surrounded 
drainage area
No No -- -- -72.860433 41.9893667
60 OF-2 11/21/22 -- -- -- -- --
Outfall located in residential 
yard.
Will need access 
granted.
No -- -- -72.860133 42.0091667
61 OF-99 11/21/22 HDPE Flared End 12 Poor Poor
Outfall located parallel to road 
and discharges into drainage 
swale; outfall and swale 
indicate sediment loading; 
residential area with apple 
orchard adjacent property
Maintenance-
potential 
sediment loading 
from connecting 
infr
astr
urcture. 
Further 
investigation 
needed.
No
--
-- -72.863217 42.0083667
62 OF-69 11/21/22
Corrugated 
Metal
Other 12 Fair Good
Outfall located in wooded area 
of residential neighborhood; 
riprap visible on either side of 
outfall, top of outfall, and at 
base of drainage channel; 
outfall filled with sandy 
material
Maintenance-
sediment 
removal
No
--
-- -72.852667 42.0150167
63 OF-68 11/21/22 Concrete Flared End 18 Poor Fair
Outfall located in wooded area 
of residential neighborhood; 
riprap visible at mouth of 
outfall pipe and in discharge 
area; heavy leaf litter filling 
outfall . 
Maintenance-
leaf litter 
removal.
No
--
-- -72.853285 42.0158677
2022

Page 226

Number Outfall ID
Inspection 
Date
Material Subtype
Diameter 
(Inches)
Condition
Erosion 
Control
Notes Illicit Discharge
Illicit 
Discharge 
Flow Type
Illicit 
Discharge 
Description
Sample 
Collection
Longitude Latitude
Town of Granby
Dry Weather Inspections 
2018  -2024
64 OF-67 11/21/22 Concrete Flared End 18 Fair Fair
Outfall on Other side of road 
and connected to outfall 68; 
discharges into wooded swale: 
riprap on either side of swale 
and above outfall; heavy leaf 
litter  
Maintenance-
leaf litter 
removal.
No -- -- -72.853467 42.01585
65 OF-100 11/21/22 Concrete Other 18 Poor Poor
Outfall pipe discharging to an 
intermittent stream in wooded 
area adjacent to road; 
residential area; brick sized 
riprap on either side of stream; 
wood debris covering outfall 
Maintenance-
debris removal
No -- -- -72.84835 42.0157833
66 OF-119 11/21/22 Concrete Flared End 12 Fair Fair
Outfall pipe discharges to 
small drainage swale with 
riprap on all sides; located in 
wooded area of residential 
neighborhood; heavy leaf litter 
in outfall pipe
Maintenance-
leaf litter 
removal.
No -- -- -72.859 42.0314833
67 OF-120 11/21/22 -- -- -- -- --
Outfall located in residential 
yard 
Will need access 
granted.
No -- -- -72.857017 42.0305
68 OF-121 11/21/22 -- -- -- -- --
Outfall located in residential 
yard 
Will need access 
granted.
No -- -- -72.85495 42.0299167
69 OF-129 11/21/22 -- -- -- -- --
Outfall located in residential 
yard 
Will need access 
granted.
No -- -- -72.8541 42.028
70 OF-122 11/21/22 Concrete Flared End 12 Poor Poor
Outfall located in residential 
area and discharges to a 
wooded swale; no visible 
riprap; outfall pipe and swale 
covered with leaf and wood 
litter
Erosion Control 
and maintenance
-
leaf litter and 
wood removal
No
--
-- -72.853183 42.0293
71 OF-132 11/21/22 Concrete Flared End 18 Excellent Good
Outfall pipe located in 
wooded area of residential 
neighborhood; discharges to 
drainage swale leading into 
woods; brick sized riprap 
located on all sides and 
bottom of swale. 
No
No
--
-- -72.847967 42.0267667
72 OF-131 11/21/22 -- -- -- -- --
Outfall located in residential 
yard 
Will need access 
granted.
No
--
-- -72.846783 42.0287333
73 OF-41 11/21/22 Concrete Flared End 12 Good Fair
Outfall pipe adjacent to road 
and discharged into small 
swale; located in residential 
area; no riprap, medium sized 
b
oulders naturally around base 
of swale; signfiicant leaf litter
Maintenance-
leaf litter 
removal.
No -- -- -72.845433 42.03185
74 OF-151 11/21/22 Concrete headwall 36 Good Good
Intermittent stream and small 
pond adjacent to road and at 
b
ase of ravine; medium stones 
and small boulders along 
edges of stream; headwall at 
entrance of culverted stream
No No -72.843467 42.0358667
75 OF-53 11/21/22 -- -- -- -- --
Outfall located in residential 
yard
Will need access 
granted.
No -- -- -72.849427 42.0348069
76 OF-147 11/21/22 -- -- -- -- --
Outfall located in residential 
yard
Will need access 
granted.
No -- -- -72.840183 42.0279667
77 OF-145 11/21/22
Corrugated 
Metal
Flared End 60 Good Good
Outfall pipe in residential area 
adjacent to road; discharges 
into perennial pond; medium 
sized boulders at mouth of 
outfall and entrance to pond.
No No -- -- -72.843767 42.0279333
2022

Page 227

Number Outfall ID
Inspection 
Date
Material Subtype
Diameter 
(Inches)
Condition
Erosion 
Control
Notes Illicit Discharge
Illicit 
Discharge 
Flow Type
Illicit 
Discharge 
Description
Sample 
Collection
Longitude Latitude
Town of Granby
Dry Weather Inspections 
2018  -2024
78 OF-159 11/21/22 -- -- -- -- -- Outfall in residential yard
Will need access 
granted.
No -- -- -72.841083 42.0237167
79 OF-158 11/21/22 Concrete Flared End 36 Excellent Fair
Outfall located in woods of 
residential neighborhood; 
discharges to flat wooded area 
with organic material
No No -- -- -72.839533 42.0226833
80 OF-157 11/21/22 Concrete Flar
ed End 60 Excellent Excellent
Outfall located in wooded area 
of residential neighborhood; 
outfall pipe discharges to 
swale with brick sized riprap 
on all sides.
No No -- -- -72.83905 42.0215
81 OF-156 11/21/22 Concrete Flared End 18 Good Good
Outfall in wooded area of 
residential neighborhood; 
p
arallel to OF-157; discharges 
to swale with riprap on all 
sides; brick sized riprap on top 
of outfall pipe. 
No No -- -- -72.839633 42.0208667
82 OF-144 11/21/22 -- -- -- Poor Poor
Outfall located in overgrown 
wooded swale at corner of 
Stonehenge Way and Silver 
Street; outfall pipe  covered in 
brush and leaf litter and not 
visible; no visible erosion 
control.
Erosion Control 
and Maintenance
-
removal of 
leaves and brush.
No -- -- -72.840733 42.0199667
83 OF-176 11/21/22 -- -- -- -- --
Outfall located in wooded area 
behind home.
Will need access 
granted.
No
--
-- -72.847533 42.02225
84 OF-98 11/21/22 HDPE Other 12 Good Good
Outfall pipe in wooded area 
adjacent to road in residential 
neighborhood; discharges to 
swale with brick sized riprap 
along swale and on top of 
pipe; ephemeral stream 
beyond rip rap. 
No
No
--
-- -72.8437 42.0043667
85 OF-141 11/21/22 Concrete Other 12 Fair Fair
Outfall pipe from under road 
to empty field; surrounded by 
brush; discharges to small 
gravel swale. 
Erosion control 
and maintenance
-
brush clearing
No -- -- -72.863883 41.9718167
86 OF-72 11/21/22 -- -- -- -- --
Outfall located in residential 
yard 
Will need access 
granted.
No -- -- -72.780011 41.9591265
87 OF-65 07/20/23 Concrete End Wall 3 Good --
No riprap erosion control, no 
organic debris covering the 
mouth of the outfall. 3 inch 
HDPE pipe likely from 12 
Byron Drive discharging 
significant amount of water 
into catch basin linked to OF 
65. Sample taken from 
discharge pipe.
Yes Heavy
Foamy, organic 
smell
Sample 
collected 
from 
discharge 
pipe
-72.799925 41.9287993
88 OF-113 07/20/23 Concrete End Wall 12 Excellent Poor di
scharges into wooded swale No -- -- -- -72.843083 41.9602333
89 OF-114 07/20/23 Concrete End Wall 12 Excellent Poor di
scharges into wooded swale No -- -- -- -72.842833 41.9621833
90 OF-115 07/20/23 Concrete End Wall 12 Fair N/A
End Wall with no riprap and 
no organic debris blocking it
No -- -- -- -72.842067 41.9631
91 OF-169 04/10/23 HDPE Other 12 Good Good
Observed clean and free of 
debris, riprap observed 
nearby, upgradient catch basin 
observed with some organic 
debris on grate 
No -- -- -- -72.799518 41.9630849
92 OF-188 07/20/23 Concrete End Wall 12 Fair Poor
No riprap erosion control, 
outfall located deep in the 
woods along a walking path
No -- -- -- -72.789517 41.99995
93 OF-189 07/20/23 Concrete Flared End 12 Poor N/A
OF-189, outfall was almost 
completely submerged in the 
pond , no riprap
No -- -- -- -72.802067 41.9264667
94 OF-19 07/20/23 Concrete End Wall 12 Good Poor disc
harges into wooded swale No -- -- -- -72.885667 41.9490333
2022
2023

Page 228

Number Outfall ID
Inspection 
Date
Material Subtype
Diameter 
(Inches)
Condition
Erosion 
Control
Notes Illicit Discharge
Illicit 
Discharge 
Flow Type
Illicit 
Discharge 
Description
Sample 
Collection
Longitude Latitude
Town of Granby
Dry Weather Inspections 
2018  -2024
96 OF-22 07/20/23 Concrete End Wall 12 Excellent Poor
discharges into grassy swale 
that leads to pond
No -- -- -- -72.88855 41.9412833
97 OF-32 07/20/23 HDPE Flared End 12 Excellent Excellent
discharges into wooded swale No -- -- -- -72.864833 41.95065
98 OF-57 07/20/23 Concrete Flared End 12 Fair Fair
No organic debris covering 
outfall, riprap could be better 
No -- -- -- -72.893817 41.9396833
99 OF-60 07/20/23 Concrete End Wall 12 Excellent Good
discharges into stream No
--
--
-- -72.883604 41.9535825
100 OF-84 04/10/23 Concrete Flared End 14 Poor Fair
Lots of leaf litter, fallen 
b
ranches and organic debris at 
mouth of outfall, little 
sediment accumulation 
observed in pipe, erosion 
control (asphalt Flared End) 
deterioration, 
No -- -- -- -72.799533 41.9649667
101 OF-89 04/10/23 Concrete Flared End 16 Fair Good
Little sediment, leaf litter and 
algae observed in pipe, little 
deterioration to Flared End, 
riprap under wire outlining dry 
basin, adjacent to metal 
culvert 
-- -- -- -- -72.830991 41.9405359
102 OF-42 07/20/23
Corrugated 
Metal
End Wall 18 Good Poor discharges into wooded swale No -- -- -- -72.826474 41.9634246
103 OF-6 04/10/23
Corrugated 
Metal
Other 18 Good Poor
Rill erosion observed at mouth 
of outfall, little refuse 
observed, connected to catch 
b
asin - well maintained trail to 
outfall location, leaf litter and 
organic debris restricting flow 
to stream 
No -- -- -- -72.804783 41.9192667
104 OF-70 04/10/23
Corrugated 
Metal
Flared End 18 Good Poor
Little sediment inside pipe, 
some sediment and organic 
debris accumulation at mouth 
restricting flow path
-- -- -- -- -72.798432 41.9196044
105 OF-88 04/10/23 Concrete Flared End 20 Good Fair
Lots of rip rap under metal 
wire observed around nearby 
basin (dry), lots of algae in 
water inside outfall, organic 
debris and overgrowth 
restricting flow
-- -- -- -- -72.832164 41.9416166
106 OF-101 07/20/23 Concrete Flared End 24 Good Fair disc
harges into wooded swale No -- -- -- -72.794711 41.9978051
107 OF-140 07/20/23 Concrete Flared End 24 Excellent Good
discharges into wooded swale No -- -- -- -72.801445 41.9270434
108 OF-167 07/20/23
Corrugated 
Metal
Flared End 24 Fair Poor
Organic debris covering the 
area, riprap in poor condition
No -- -- -- -72.83905 41.96065
109 OF-17 07/20/23 HDPE Flared End 24 Good Fair
discharges into wooded swale. 
Likely a stream
No -- -- -- -72.782256 41.9929713
110 OF-173 04/10/23 Concrete Flared End 24 Fair Poor
Disconnected from Flared 
End, rill erosion observed, 
algae on water, some sediment 
and organic debris 
accumulation restricting flow 
path, connected to upgradient 
catch basin
No -- -- -- -72.805754 41.919734
111 OF-174 07/20/23 Concrete End Wall 24 E
xcellent Excellent discharges into
 wooded stream No -- -- -- -72.853083 41.9617333
112 OF-175 07/20/23 Concrete Flared End 24 Fair Fair
Water is slowly flowing from 
the pond into the outfall
No -- -- -- -72.850617 41.9621667
113 OF-184 07/20/23 HDPE Flared End 24 -- N/A
No riprap erosion control, a 
small amount of organic 
debris at the bottom of the 
outfall
No -- -- -- -72.786576 41.9951394
114 OF-31 07/20/23 HDPE Flared End 24 Fair Good
Outfall located a little ways 
into the woods, plenty of 
riprap, no organic debris 
covering it
No -- -- -- -72.863533 41.9541833
115 OF-43 07/20/23
Corrugated 
Metal
Flared End 24 Poor Poor
Organic debris covering most 
of the mouth of the outfall but 
not blocking it, little-to-no 
riprap
No -- -- -- -72.834683 41.9564833
2023

Page 229

Number Outfall ID
Inspection 
Date
Material Subtype
Diameter 
(Inches)
Condition
Erosion 
Control
Notes Illicit Discharge
Illicit 
Discharge 
Flow Type
Illicit 
Discharge 
Description
Sample 
Collection
Longitude Latitude
Town of Granby
Dry Weather Inspections 
2018  -2024
117 OF-63 07/20/23 Concrete Flared End 24 Good Fair
discharges into pond in 
wooded area
No -- -- -- -72.88795 41.9247333
118 OF-75 07/20/23 Concrete End Wall 24 Good Good
discharges into stream. Outfall 
has good erosion control, but 
stream is causing considerable 
erosion.
No -- -- -- -72.811846 41.9963389
119 OF-94 07/20/23 Concrete Flared End 24 Fair N/A
N
o organic debris covering the 
outfall, no riprap erosion 
control
No -- -- -- -72.817967 41.9800833
120 OF-16 07/20/23 HDPE Flared End 30 Fair Fair
No organic debris covering 
outfall, no riprap erosion 
control
No -- -- -- -72.7844 41.9912167
121 OF-21 07/20/23 Concrete Flared End 32 Fair N/A
No riprap erosion control, 
outfall located about 5-8 feet 
from pond 
No -- -- -- -72.888233 41.9416667
122 OF-116 07/20/23 Concrete End Wall 36 Good Good di
scharges into stream No
--
--
-- -72.804051 41.9564097
123 OF-180 07/20/23
Corrugated 
Metal
End Wall 36 Good Good
discharges into wooded area. 
stream connected across the 
street
No
--
--
-- -72.807267 41.9954352
124 OF-55 07/20/23 Concrete Flared End 40 Fair N/A
No riprap erosion control, no 
organic debris covering 
outfall, the neighbor told me 
the area tends to flood 
whenever it rains 
No
--
--
-- -72.811883 41.9976667
125 OF-137 07/20/23 -- -- -- -- --
located behind private 
property. could not locate
--
--
--
-- -72.77886 41.9649746
126 OF-177 07/20/23 -- -- -- -- --
private property could not 
locate
--
--
--
-- -72.777633 41.9461
127 OF-18 07/20/23 -- -- -- -- --
Outfall located on 50 mph 
road, deemed not safe to 
investigate 
--
--
--
-- -72.884233 41.9531833
128 OF-183 07/20/23 -- -- -- -- --
on private property. could not 
locate
--
--
--
-- -72.804852 41.9252782
129 OF-187 07/20/23 -- -- -- -- --
Outfall was behind a fenced in 
area, could not go to 
investigate 
--
--
--
-- -72.795517 41.9289833
130 OF-23 07/20/23 -- -- -- -- --
heavily vegetated area. could 
not locate. no catch basin to 
reference.
--
--
--
-- -72.890983 41.9364833
131 OF-24 07/20/23 -- -- -- -- --
private property could not 
locate
--
--
--
-- -72.889899 41.9313678
132 OF-25 07/20/23 -- -- -- -- -- behind fence. could not locate --
--
--
-- -72.88795 41.9280667
133 OF-51 07/20/23 -- -- -- -- -- could not locate
--
--
--
-- -72.823095 41.9977778
134 OF-52 07/20/23 -- -- -- -- -- Could not locate outfall --
--
--
-- -72.82165 41.99785
135 OF-54 07/20/23 -- -- -- -- --
Could not locate outfall but 
found some riprap going into 
the stream
--
--
--
-- -72.811705 41.9965691
136 OF-59 07/20/23 -- -- -- -- --
private property could not 
locate
--
--
--
-- -72.886667 41.94215
137 OF-61 04/10/23 -- -- -- -- Poor
OF-61 could not locate, 
possibly covered by leaf litter 
and organic debris, significant 
rill erosion along abutting 
property’s driveway and back 
yard, ponding observed in 
backyard, upgradient catch 
basin with lots of sediment 
--
--
--
-- -72.798129 41.9624553
138 OF-7 07/20/23 -- -- -- -- --
located down a very steep 
embankment. could not 
Iocate. discharges into 
wooded area likely containing 
a stream
--
--
--
-- -72.8631 41.9553167
139 OF-80 04/10/23 Precast Flared End -- Poor Poor
Completely buried, lots of 
sediment accumulation and 
organic debris at mouth of 
outfall, connected to 2 
upgradient catch basins
No
--
--
-- -72.788783 41.9206805
140 OF-81 04/10/23 Concrete Flared End -- Poor Poor
Completely buried/silted in, 
leaf litter and sediment 
accumulation at mouth of 
outfall 
No
--
--
--
-72.801673 41.9643991
2023

Page 230

Number Outfall ID
Inspection 
Date
Material Subtype
Diameter 
(Inches)
Condition
Erosion 
Control
Notes Illicit Discharge
Illicit 
Discharge 
Flow Type
Illicit 
Discharge 
Description
Sample 
Collection
Longitude Latitude
Town of Granby
Dry Weather Inspections 
2018  -2024
142 OF-85 04/10/23 Concrete Flared End -- Poor Poor
Completely buried/silted in, 
lots of leaf litter , sediment 
and organic debris, evidence 
of rill erosion covered by 
debris
-- -- -- -- -72.799646 41.9633826
143 OF-86 04/10/23 Concrete Flared End -- Poor Poor
Completely buried, lots of 
sediment inside pipe, lots of 
leaf litter and organic debris 
blocking flow path, pooling 
observed with lots of algae, 
nearby culvert with medium to 
large riprap nearby 
-- -- -- -- -72.83428 41.9418333
144 OF-87 04/10/23 -- -- -- Poor Poor
Completely 
covered/obstructed by vines 
and fallen trees, nearby culvert 
culvert, little medium riprap 
around mouth of outfall, 
riprap under metal wire 
around dry basin, lots of leaf 
litter and organic debris 
obstructing flow 
-- -- -- -- -72.832964 41.9419666
145 OF-91 07/20/23 -- -- -- -- -- Could not locate -- -- -- -- -72.809459 41.9572965
146
OF-190 
(Unmapped)
04/10/23 Concrete End Wall -- Poor Poor
Unmapped location, end wall 
and buried pipe observed on 
private property connected to 
catch basin at street, actual 
outfall mapped on property 
was not found 
-- -- -- -- -72.801612 41.9639316
147
OF-191  
(Unmapped)
04/10/23 Concrete Flared End -- Poor Poor
Unmapped outfall observed 
completely buried in 
sediment. Outfall potentially 
connected to catch basin at 
street and flow into stream 
behind private property 
-- -- -- -- -72.800965 41.9646858
148 OF-5 12/13/24 -- -- -- -- --
Outfall located on private 
property
-- -- -- -- -72.830732 41.9295177
149 OF-161 12/13/24 HDPE Flared End -- Excellent Good
Outfall in good condition, 
Flared End clear of sediment 
and debris.
No -- -- No -72.832167 41.9334
150 OF-162 12/13/24 -- -- -- -- --
Outfall located on private 
property
-- -- -- -- -72.837367 41.9333
151 OF-45 12/13/24 -- -- -- -- --
Followed a path in the woods 
that seemed to be leading to 
outfall, there was a gate 
almost halfway to the outfall, 
did not proceed past the gate.
-- -- -- No -72.835767 41.9351667
152 OF-108 12/13/24 HDPE Flared End -- Good Good
A pond that discharges to a 
stream, the pond was frozen 
so it was not discharging.
No -- -- No -72.839367 41.9374667
153 OF-89 12/13/24 Concrete Flared End -- Good Good
No sediment or debris 
blocking outfall, good erosion 
control under leaves
No -- -- No -72.830997 41.9405333
154 OF-77 12/13/24 Concrete Flared End -- Good Good
Very large Flared End, outfall 
appears to be on the opposite 
side of the road where it’s 
marked on the map.
No -- -- No -72.824233 41.9246167
155 OF-76 12/13/24 Concrete Flared End -- Good Good
Outfall located about 20 feet 
into the woods, no sediment or 
debris blocking outfall, very 
large Flared End.
No -- -- No -72.824333 41.9243667
156 OF-139 12/13/24 -- -- -- -- -- Located on private property -- -- -- No -72.8029 41.9276167
157 OF-189 12/13/24 Concrete Flared End -- -- None
Outfall feeds into the large 
pond, a crack in the pipe was 
observed.
No -- -- -- -72.802067 41.9264667
158 OF-64 12/13/24 -- -- -- -- --
Unable to locate outfall, 
appears to be behind 
someone’s house and deep in 
the woods.
--
--
--
No
-72.899183 41.9262333
2024
2023

Page 231

Number Outfall ID
Inspection 
Date
Material Subtype
Diameter 
(Inches)
Condition
Erosion 
Control
Notes Illicit Discharge
Illicit 
Discharge 
Flow Type
Illicit 
Discharge 
Description
Sample 
Collection
Longitude Latitude
Town of Granby
Dry Weather Inspections 
2018  -2024
160 OF-97 12/13/24 Concrete End Wall -- Good Good
Very slight discharge, seemed 
to be groundwater.
Yes Trickle -- No -72.8778 41.95735
161 OF-26 12/13/24 Concrete End Wall -- Good Good
Outfall marked in the middle 
of intersection, there is also a 
swale that runs along the 
street.
No -- -- No -72.822817 41.9706833
162 OF-93 12/13/24 -- -- -- -- --
Outfall located on private 
property, running water was 
heard inside the catch basin. 
Too deep to grab a sample.
-- -- -- -- -72.819465 41.9724323
163 OF-92 12/13/24 -- -- -- -- --
Outfall located on private 
property 
-- -- -- No -72.818817 41.9722167
164 OF-12 12/13/24 -- -- -- -- --
Outfall located behind private 
property.
-- -- -- No -72.817417 41.9725833
165 OF-107 12/13/24 -- -- -- -- --
Outfall located on private 
property.
-- -- -- No -72.812167 41.9711
166 OF-118 12/13/24 Concrete Flared End -- Poor Poor
Sediment and organic debris 
build up in outfall.
No -- -- No -72.81505 41.9694667
167 OF-78 12/13/24 Concrete Flared End --
In Need of 
Repair
None
Outfall 75% buried in 
sediment and organic debris, 
also the map says that it’s on 
the left side of the street but 
it’s actually straight ahead.
No -- -- No -72.813583 41.9685
168 OF-166 12/13/24 Concrete -- -- Good --
Only able to view outfall from 
street, located on private 
property.
Yes -- -- No -72.818783 41.9618667
169 OF-66 12/13/24 Concrete Flared End -- Good Good
Appeared to be a culvert for a 
stream.
Yes -- -- No -72.805867 41.9556667
170 OF-186 12/13/24 -- -- -- -- --
Outfall located on private 
property, catch basin grate 
appeared to be deteriorating
-- -- -- -- -72.797673 41.9525267
171 OF-61 12/13/24 -- -- -- -- --
Outfall located on private 
property.
-- -- -- -- -72.798129 41.9624543
172 OF-39 12/18/24 Concrete Flared End -- Good None
24"" concrete Flared End 
discharges to wooded swlae 
that leads to a surface 
waterbody. Leaf litter and 
detritus present within the 
pipe. No erosion controls 
observed.
No -- -- No -72.79415 41.9715667
173 OF-40 12/18/24 Concrete Flared End -- Good Poor
Outfall in good condition but 
erosion observed on sides of 
swale. rip rap present 
underneath outfall mouth
No -- -- -- -72.794533 41.9728167
174 OF-36 12/18/24 -- -- -- -- --
Could not confirm location of 
outfall, located on residential 
property. No pipes visible in 
associated catch
 basin. There 
appears to be a drainage area 
across the street, but no visible 
pipe.
No -- -- No -72.776117 41.9751833
175 OF-128 12/18/24 -- -- -- -- --
No outfall or catch basins 
observed in immediate area of 
mapped outfall. Road was 
recently repaved and brand 
new catch basins were 
observed. 
-- -- -- No -72.766367 41.9742167
176 OF-127 12/18/24 Concrete -- -- -- --
Unable to find exact location 
of outfall. likely behind 
residential property. 
connecting catch basin has a 
small hope pipe discharging 
into it. farm land observed in 
general area outfall. 
--
--
--
No -72.76845 41.9718833
177
OF-126
12/18/24
Corrugated 
Metal
End Wall -- Good Poor
Two 18" corrugated metal 
pipes discharge to a wooded 
swale. One pipe is connected 
to a catch basin up the street, 
the Other acts as overflow for 
the pond across the street. 
Pipes are partially blocked by 
leaf litter and sediment. 
No
--
--
No -72.774108 41.9649043
178 OF-163 12/18/24 Concrete -- -- Good --
Unable to locate outfall 
located on residential property 
discharges to a small pond 
period catch basin.Not 
flowing.
--
--
--
No -72.813817 41.9603667
2024

Page 232

Number Outfall ID
Inspection 
Date
Material Subtype
Diameter 
(Inches)
Condition
Erosion 
Control
Notes Illicit Discharge
Illicit 
Discharge 
Flow Type
Illicit 
Discharge 
Description
Sample 
Collection
Longitude Latitude
Town of Granby
Dry Weather Inspections 
2018  -2024
180 OF-185 12/18/24 HDPE End Wall -- Good None
18"" hdpe pipe discharges to 
grassy swale. No erosion 
controls present and rill 
erosion along swale observed. 
Some minor leaf litter 
accumulated in the pipe.
No -- -- No -72.814783 41.9796
181 OF-178 12/18/24
Corrugated 
Metal
-- -- Good Poor
18"" corrugated metal pipe 
discharges to wooded stream.
No -- -- No -72.811817 41.9865333
182 OF-135 12/18/24 Concrete -- -- -- --
18"" pipe in catch basin 
discharges to outfall located 
on residential property. 
No -- -- No -72.812733 41.9861167
183 OF-171 12/18/24 Concrete -- -- -- --
18"" concrete pipe discharges 
from catch basin to an outfall 
on residential property. It is 
assumed the outfall discharges 
to the pond/wetland area 
behind the home.
No -- -- No -72.803067 41.9839833
184 OF-172 12/18/24 Concrete Pipe -- Good Good
Outfall observed to be in good 
condition. Rip rap at mouth of 
pipe minimizing erosion. 
Discharges to a wetland area 
that is wooded.
No -- -- No -72.802717 41.9831333
185 OF-179 12/18/24 -- -- -- -- --
Unable to locate outfall in 
residential back yard. New 
catch basin grated and road 
was recently paved. 
Connecting catch basin was 
recently cleaned. 
-- -- -- No -72.808983 41.9921333
186 OF-134 12/18/24
Corrugated 
Metal
End Wall -- Good None
18"" corrugated metal pipe 
discharges to wooded swale. 
No erosion controls observed. 
Rill erosion observed.
No -- -- No -72.80545 41.9916667
187 OF-138 12/18/24 -- -- -- -- --
Unable to locate outfall, 
observed to be in residential 
back yard. catch basin has 
some sediment in basin. 
-- -- -- No -72.80135 41.9927
188 OF-50 12/18/24 Concrete -- -- -- --
18"" concrete pipe discharges 
from catch basin to woods 
behind home.
No -- -- No -72.8044 41.9946333
189 OF-48 12/18/24 Concrete Flared End -- Good Good
Culvert outfall directing water 
under the road. steady flow 
fromm stream in a wooded 
area. good rip rap present
Yes Steady -- No -72.80575 41.9953667
190 OF-8 12/18/24 HDPE -- -- Good Good
18"" hdpe Flared End 
discharges to stream in 
wooded area. some small to 
medium riprap observed. 
-- -- -- No -72.805717 41.9956
191 OF-54 12/18/24 Concrete Flared End -- Poor Good
outfall pipe found semi buried 
near a goat farm. discharges to 
Bradley brook via rip rap 
No -- -- No -72.8117 41.9965667
192 OF-33 12/18/24 HDPE End Wall -- Good Poor
18"" hdpe pipe discharges to 
roadside wooded swale. some 
large pieces of riprap 
observed. Some rill erosion 
observed. 
No -- -- No -72.816867 42.00245
193 OF-34 12/18/24 -- -- -- -- --
Closest cb does not have 
piping going to small stream. 
-- -- -- -- -72.8189 42.0045333
194 OF-35 12/18/24 Concrete Pipe -- Good Good
outfall observed to be in good 
condition with rip rap for 
erosion control. discharges 
tona stream that travels 
through neighborhood back 
yards. 
No -- -- No -72.8223 42.0059167
195 OF-117 12/18/24
Corrugated 
Metal
--
--
-- --
18"" corrugated metal pipe 
discharges from catch basin to 
wooded area behind home. 
No
--
--
No -72.82045 42.0217167
196 OF-143 12/18/24 Concrete Pipe -- Poor None
Outfall discharges to a stream 
behind residential properties. 
outfall blocked by tree with no 
erosion control present. 
connecting catch basin also 
receives runoff from opposite 
side of road where a sheep 
farm is located. a pond/swale 
was observed on farm side 
No
--
--
No -72.840398 42.0134286
2024

Page 233

Number Outfall ID
Inspection 
Date
Material Subtype
Diameter 
(Inches)
Condition
Erosion 
Control
Notes Illicit Discharge
Illicit 
Discharge 
Flow Type
Illicit 
Discharge 
Description
Sample 
Collection
Longitude Latitude
Town of Granby
Dry Weather Inspections 
2018  -2024
198 OF-146 12/18/24 -- -- -- -- --
Unable to locate outfall. 
Could not locate associated 
catch basin.
-- -- -- No -72.8433 42.0262667
199 OF-149 12/18/24 Concrete End Wall -- Good Good
18"" concrete pipe discharges 
to a wooded stream.
No -- -- No -72.8343 42.02895
200 OF-150 12/18/24 Concrete Pipe -- Good Good
Small pipe next to culvert. two 
small outfalls next to large 
culverted pipe discharges into 
stream. both are connected to 
catch basin
No -- -- No -72.834163 42.0290724
201 OF-96 12/18/24 Concrete -- -- Good --
Unable to locate outfall. on 
residential property by a lake. 
Inspected connecting catch 
basin, in good condition 
No -- -- No -72.850383 42.0317333
202 OF-130 12/18/24 Concrete -- -- Poor Poor
Outfall pipe appears to be 
buried in leaf litter. Pipe 
observation in catch basin 
shows an 18"" concrete pipe.
No -- -- No -72.8503 42.0228167
203 OF-124 12/18/24 HDPE Pipe -- Good Good
Discharges to fox brook. some 
sediment accumulation 
observed downstream of 
brook. rip rap in place to 
minimize erosion. pipe was 
dry during inspection. 
connecting cb was covered in 
leaf litter 
No -- -- No -72.862033 42.0267833
204 OF-125 12/18/24 Concrete -- --
In Need of 
Repair
None
Outfall discharges to wooded 
area. Sediment accumulation 
observed in drainage area. 
Pipe appears to be completely 
buried. 
No
--
--
No -72.863667 42.0281833
1. Outfalls were sampled for potential Illicit Discharges
2. Outfalls inspected multiple
 times throughout permit (15)
2024
Notes

Page 234

 
 
 
 
DRY WEATHER INSPECTIONS ILLICIT DISCHARGE SAMPLING 
RESULTS
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Page 235

Chlorine 
Residual
Ammonia as 
Nitrogen
MBAS Conductivitiy Salinity
Escherichia 
Coli
Total Coliforms
umhos/cm ppt
OF-104 11/15/22 Good Discharge Observed. <0.02 0.17 0.13 373 <0.50
243 >24200
OF-65 7/20/23 Good
Discharge is foamy and has an organic odor. 
3 inch plastic pipe likely from 12 Byron 
Drive discharging heavy flow of water into 
catch basin linked to OF 65. Sample taken 
from discharge pipe in CB-180.
<0.02 <0.05 <0.10 80 <0.5 41
2,360
3. Fecal Coliform >31 col/100 mL for Cl
ass SA and >260 col/100mL for Class SB
4. Enterococci  >104 col/100mL for Swimming Areas and >500 col/100mL for all others.
5. Ammonia >0.5 mg/L
6. Surfactants (MBAS) > 0.25 mg/L
Atlas did not observe any Illicit Discharges 
while dry weather inspecting outfalls in 2024. 
2022
2023
Discharge Description
 Screening Indicators
2024
mg/L
MPN/100mL
8. Conductivity >1,500 uS
9. Salinity 
≥
 0.5 ppt
Town of Granby 
Dry Weather Inspections 
Illicit Discharge Sampling Results
Notes:
* All highlighted bacterial concentrations are required for follow-up investigations. 
*Highlighting is based on the following criteria;
1. E. Coli  >235/100mL for Swimming Ar
eas, and >410 col/100mL for all others.
2. Total Coliform > 500 col/100mL
7. Chlorine: detectable level
Outfall ID
Inspection 
Date
Condition

Page 236

 
 
 
 
CATCHMENT ASSESSMENT AND PRIOIRTY RANKING MATRIX
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Page 237

Town of Granb
y
Catchment Assessment 
and
Priority Ranking Matrix
Catc
hment ID Receiving Water
Previous Screening 
Results Indicate 
Likely Sewer Input? 
1
Discharging to 
Area of Concern
 
to Public Health? 
2
Frequ
ency of 
Past Discharge 
Complaints
Receiving 
Water 
Quality 
3
Density of 
G
enerating Sites 
4
Age of Develo
pment/ 
Infrastructure 
5
Historic 
Combin
ed 
Sewers or 
Septic?
 
6
Aging 
Sep
tic? 
7
Culverted 
Streams?
 
8
Additional Chara
cteristics
Sewer Repair 
Nearby?
Urbanized Area DCIA >11% Impaired Waterbody
Additional 
Characteristics 
Score
Catchment 
inspections and 
sample results
GIS Maps Municipal Staff
Impaired 
Waters List
Land Use/GIS 
Maps, Aerial 
Photography
Land Use Information, 
Visual Observation
Municipal Staff, 
GIS Maps
Land Use, 
Municipal 
Staff
GIS and Storm 
System Maps
Other
Municipal Staff, GIS 
Maps
CLEAR
Nathan L. Jacobson & 
Associates
CLEAR
Other
Yes = 3 (Pr
oblem 
Catchm
ent)
Yes = 3 Freque
nt = 3 Poor = 3 High = 3
High = 3
Yes = 3 Yes = 3 Yes = 3
Yes=2
Yes =1
Yes =1
Yes =1
High = 3
No = 0
No = 0 Occasional = 2 Fair = 2 Medium = 2 Medium = 2 No = 0 No = 0 No = 0
No=0
No = 0
No = 0
No = 0 Medium =1-2
None = 0 Good = 0 Low = 1
Low = 1
Low = 0
4001-00-1* Great Brook
0
0
1
2
0
0 Wooded; goes into MA 
0
0
0
1
4 Low Priority
4300-44-1-L1 Farmington River
0
0
3
1
0
0
Mostly residential with some 
agricultrual
2
1
0
0
1
8 Problem
4309-00-1 Cherry Brook
0
0
1
1
0
0
Wooded with some 
agricultural land
0
0
0
1
3 Low Priority
4309-01-1 Cherry Brook
0
0
2
2
0
3
Wooded with residential 
along highway
1
0
0
2
10 High Priority
4309-02-1 Cherry Brook
0
0
1
1
0
0
Mostly wooded with some 
residential
1
0
0
0
3 Low Priority
4319-00-2-R1 West Branch Salmon Brook
3
2
2
2
0
3
Mostly wooded with 
recreational areas along 
stream and some residential
1
0
1
2
16 High Priority
4319-00-2-R2 West Branch Salmon Brook
0
2
2
2
0
3
Woode
d W of stream; 
Residen
tial E of stream
2
1
0
1
1
14 High Prior
ity
4319-00-3-R1 West Branch Salmon Brook
0
2
1
2
0
0
Woode
d with State Hwy 20 
bisecting catchm
ent 
0
0
1
1
7 Problem
43
19-00-3-R2 West Branch Salmon Brook
0
2
1
2
0
0
Mostly wooded with light 
agricultural land East of the 
stream
1
0
1
1
8 Problem
4319-00-3-R3 West Branch Salmon Brook
0
2
1
1
0
0
Wooded
0
0
1
0
5 Low Priority
4319-00-3-R4 West Branch Salmon Brook
0
2
2
2
0
0 Agricultural and Wooded
0
0
1
1
8 Problem
4319-00-3-R5 West Branch Salmon Brook
3
2
1
2
0
3
Wooded with some 
residential/commercial; park
2
1
0
1
1
16 High Priority
4319-00-3-R6 West Branch Salmon Brook
0
2
2
2
0
3
Wooded/residential with 
some agricultural land
1
0
1
1
12 High Priority
4319-02-1 Moosehorn Brook
0
0
1
1
0
3
Mostly wooded with minimal 
residential
0
0
0
1
6 Problem
4319-03-2-R1 West Branch Salmon Brook
0
0
1
1
0
0
Woode
d; Stream meanders 
Westward; flo
odplain
0
0
0
0
2 Low Priority
Sco
re
Priority Ranking
                   
Low Priority:
 0-5                             
Problem
: 6-9                                     
High Prior
ity
: ≥10
Information Source
Scoring Criteria
Description
Page 1 of 6

Page 238

Town of Granb
y
Catchment Assessment 
and
Priority Ranking Matrix
Catc
hment ID Receiving Water
Previous Screening 
Results Indicate 
Likely Sewer Input? 
1
Discharging to 
Area of Concern
 
to Public Health? 
2
Frequ
ency of 
Past Discharge 
Complaints
Receiving 
Water 
Quality 
3
Density of 
G
enerating Sites 
4
Age of Develo
pment/ 
Infrastructure 
5
Historic 
Combin
ed 
Sewers or 
Septic?
 
6
Aging 
Sep
tic? 
7
Culverted 
Streams?
 
8
Additional Chara
cteristics
Sewer Repair 
Nearby?
Urbanized Area DCIA >11% Impaired Waterbody
Additional 
Characteristics 
Score
Catchment 
inspections and 
sample results
GIS Maps Municipal Staff
Impaired 
Waters List
Land Use/GIS 
Maps, Aerial 
Photography
Land Use Information, 
Visual Observation
Municipal Staff, 
GIS Maps
Land Use, 
Municipal 
Staff
GIS and Storm 
System Maps
Other
Municipal Staff, GIS 
Maps
CLEAR
Nathan L. Jacobson & 
Associates
CLEAR
Other
Yes = 3 (Pr
oblem 
Catchm
ent)
Yes = 3 Freque
nt = 3 Poor = 3 High = 3
High = 3
Yes = 3 Yes = 3 Yes = 3
Yes=2
Yes =1
Yes =1
Yes =1
High = 3
No = 0
No = 0 Occasional = 2 Fair = 2 Medium = 2 Medium = 2 No = 0 No = 0 No = 0
No=0
No = 0
No = 0
No = 0 Medium =1-2
None = 0 Good = 0 Low = 1
Low = 1
Low = 0
Score
Priority Ranking
                   
Low Priority:
 0-5                             
Problem
: 6-9                                     
High Prior
ity
: ≥10
Information Source
Scoring Criteria
Description
4319
-03-2-R2 West Branch Salmon Brook
0
0
1
2
0
3
Mostly wooded with minimal 
residential areas
2
0
0
0
1
9 Problem
4319-04-1 West Branch Salmon Brook
0
0
2
2
0
3
Mostly wooded with minimal 
residential/agricultural areas
1
0
0
1
9 Problem
4319-05-1 West Branch Salmon Brook
0
0
1
1
0
3
Wooded with dense 
residential area E of stream
1
0
0
2
8 Problem
4319-06-1 Higley Brook
0
0
1
1
0
0
Woode
d with minimal cleared 
land f
or residential
2
0
0
0
0
4 Low Priority
4319-07-1 Beach Brook
0
0
1
2
0
3
Mostly wooded with minor 
residential areas towards 
lower end of stream
1
0
0
1
8 Problem
4319-08-1 Kendall Brook
0
0
1
1
0
3
A mixture of wooded, 
agricultural, and residential 
parcels
2
0
0
0
1
8 Problem
4319-09-1 West Branch Salmon Brook
0
0
1
2
0
3
Mostly wooded; little 
residential
0
0
0
1
7 Problem
4319-10-2-L1 West Branch Salmon Brook
0
0
1
2
0
3
Mostly wooded; little 
agricultural/residential
2
0
0
0
1
9 Problem
4319-10-2-L2
West Branch Salmon 
Brook; Trout Pond
0
0
1
1
0
0
Wooded
0
0
0
0
2 Low Priority
4319-10-2-R1 West Branch Salmon Brook
0
0
1
1
0
0
Wooded
0
0
0
0
2 Low Priority
4319-11-1 West Branch Salmon Brook
0
0
1
2
0
0
Wooded
0
0
0
0
3 Low Priority
4320-00-1 Unnamed Stream
0
0
1
1
0
0
Wooded with minimal 
residential; large mansion 
with cleared
 land in Southeast 
catchme
nt
0
0
0
1
3 Low Priority
Page 2 of 6

Page 239

Town of Granb
y
Catchment Assessment 
and
Priority Ranking Matrix
Catc
hment ID Receiving Water
Previous Screening 
Results Indicate 
Likely Sewer Input? 
1
Discharging to 
Area of Concern
 
to Public Health? 
2
Frequ
ency of 
Past Discharge 
Complaints
Receiving 
Water 
Quality 
3
Density of 
G
enerating Sites 
4
Age of Develo
pment/ 
Infrastructure 
5
Historic 
Combin
ed 
Sewers or 
Septic?
 
6
Aging 
Sep
tic? 
7
Culverted 
Streams?
 
8
Additional Chara
cteristics
Sewer Repair 
Nearby?
Urbanized Area DCIA >11% Impaired Waterbody
Additional 
Characteristics 
Score
Catchment 
inspections and 
sample results
GIS Maps Municipal Staff
Impaired 
Waters List
Land Use/GIS 
Maps, Aerial 
Photography
Land Use Information, 
Visual Observation
Municipal Staff, 
GIS Maps
Land Use, 
Municipal 
Staff
GIS and Storm 
System Maps
Other
Municipal Staff, GIS 
Maps
CLEAR
Nathan L. Jacobson & 
Associates
CLEAR
Other
Yes = 3 (Pr
oblem 
Catchm
ent)
Yes = 3 Freque
nt = 3 Poor = 3 High = 3
High = 3
Yes = 3 Yes = 3 Yes = 3
Yes=2
Yes =1
Yes =1
Yes =1
High = 3
No = 0
No = 0 Occasional = 2 Fair = 2 Medium = 2 Medium = 2 No = 0 No = 0 No = 0
No=0
No = 0
No = 0
No = 0 Medium =1-2
None = 0 Good = 0 Low = 1
Low = 1
Low = 0
Score
Priority Ranking
                   
Low Priority:
 0-5                             
Problem
: 6-9                                     
High Prior
ity
: ≥10
Information Source
Scoring Criteria
Description
4320
-00-2-R1 Unnamed Stream
0
0
1
1
0
0
Woode
d with small residential 
develop
ment
2
0
0
0
1
5 Low Priority
4320-00-2-R2 Fox Brook
0
0
1
1
0
3
Mostly wooded with some 
agricultural land along Hwy 89
0
0
0
1
6 Problem
4320-00-2-R3 East Branch Salmon Brook
0
0
1
2
0
0
Mostly agricultural with some 
wooded
0
0
0
2
5 Problem
4320-00-2-R4 East Branch Salmon Brook
0
0
1
2
0
0
Mostly wooded with minimal 
residential
0
0
0
1
4 Problem
4320-00-3-L1 Dismal Brook 
0
0
1
2
0
0 Commercial/Agricultural
2
1
0
0
2
8 Problem
4320-00-3-R1 East Branch Salmon Brook
0
0
1
2
0
3
Wooded with residential sites 
in the SE catchment and one 
plot of agricutural land
0
0
0
1
7 Problem
4320-00-3-R2 West Branch Salmon Brook
0
2
1
2
0
0
Wooded with agricultural and 
residential land East of stream
1
0
1
2
9 Problem
4320-00-3-R3 Mountain Brook
0
0
1
2
0
0
Agricultural
2
1
0
0
2
8 Problem
4320-00-3-R4 West Branch Salmon Brook
0
2
1
2
0
0 Mostly residential/agricultural
0
0
1
2
8 Problem
4320-00-3-R5 West Branch Salmon Brook
0
2
2
2
0
3 Mostly residential/commercial 2
1
0
1
3
16 High Priority
4320-00-3-R6 West Branch Salmon Brook
0
2
1
2
0
0
Residential with some 
agricultural land
1
0
1
2
9 Problem
4320-00-4-R1 East Branch Salmon Brook
0
0
2
2
0
3
Tariffvill
e Park, residential and 
mode
rate commercial areas
2
1
0
0
3
13 High Priority
4320-00-4-R2 Salmon Brook
0
0
1
2
0
3
Mostly Agricultural with some 
residential and wooded
1
0
0
1
8 Problem
Page 3 of 6

Page 240

Town of Granb
y
Catchment Assessment 
and
Priority Ranking Matrix
Catc
hment ID Receiving Water
Previous Screening 
Results Indicate 
Likely Sewer Input? 
1
Discharging to 
Area of Concern
 
to Public Health? 
2
Frequ
ency of 
Past Discharge 
Complaints
Receiving 
Water 
Quality 
3
Density of 
G
enerating Sites 
4
Age of Develo
pment/ 
Infrastructure 
5
Historic 
Combin
ed 
Sewers or 
Septic?
 
6
Aging 
Sep
tic? 
7
Culverted 
Streams?
 
8
Additional Chara
cteristics
Sewer Repair 
Nearby?
Urbanized Area DCIA >11% Impaired Waterbody
Additional 
Characteristics 
Score
Catchment 
inspections and 
sample results
GIS Maps Municipal Staff
Impaired 
Waters List
Land Use/GIS 
Maps, Aerial 
Photography
Land Use Information, 
Visual Observation
Municipal Staff, 
GIS Maps
Land Use, 
Municipal 
Staff
GIS and Storm 
System Maps
Other
Municipal Staff, GIS 
Maps
CLEAR
Nathan L. Jacobson & 
Associates
CLEAR
Other
Yes = 3 (Pr
oblem 
Catchm
ent)
Yes = 3 Freque
nt = 3 Poor = 3 High = 3
High = 3
Yes = 3 Yes = 3 Yes = 3
Yes=2
Yes =1
Yes =1
Yes =1
High = 3
No = 0
No = 0 Occasional = 2 Fair = 2 Medium = 2 Medium = 2 No = 0 No = 0 No = 0
No=0
No = 0
No = 0
No = 0 Medium =1-2
None = 0 Good = 0 Low = 1
Low = 1
Low = 0
Score
Priority Ranking
                   
Low Priority:
 0-5                             
Problem
: 6-9                                     
High Prior
ity
: ≥10
Information Source
Scoring Criteria
Description
4320
-00-4-R3 Salmon Brook
0
0
2
2
0
0
Mostly Agricultural
1
0
0
1
6 Problem
4320-00-4-R4 Salmon Brook
0
0
1
1
0
0
Largely Agricultural
0
0
0
1
3 Low Priority
4320-01-1 Belden Brook
0
0
1
1
0
3
Mostly wooded; Peck Orchard 
in Northwest of catchment
1
0
0
1
7 Problem
4320-02-1
Fox Brook
0
0
1
2
0
3
Moslty Wooded with some 
residential/commercial
1
0
0
1
8 Problem
4320-03-1
Salmon Brook, unnamed 
stream
0
0
1
2
0
3
Mostly residential/wooded 
with intermittnet cleared land
2
1
0
0
2
11 High Priority
4320-04-1 East Branch Salmon Brook
0
0
1
2
0
3
Mostly wooded with some 
agricultural and residential 
land
0
0
0
1
7 Problem
4320-05-2-R1 Belden Brook
0
0
1
1
0
0
Mostly wooded with a small 
orchard in Northeastern 
region of catchment
0
0
0
1
3 Low Priority
4320-05-2-R2 Belden Brook
0
0
1
2
0
3
Wooded with some 
residential
2
1
0
0
1
10 High Priority
4320-07-1
Ring Brook
0
0
1
1
0
0
Mostly wooded with one road 
of residential 
0
0
0
1
3 Low Priority
Page 4 of 6

Page 241

Town of Granb
y
Catchment Assessment 
and
Priority Ranking Matrix
Catc
hment ID Receiving Water
Previous Screening 
Results Indicate 
Likely Sewer Input? 
1
Discharging to 
Area of Concern
 
to Public Health? 
2
Frequ
ency of 
Past Discharge 
Complaints
Receiving 
Water 
Quality 
3
Density of 
G
enerating Sites 
4
Age of Develo
pment/ 
Infrastructure 
5
Historic 
Combin
ed 
Sewers or 
Septic?
 
6
Aging 
Sep
tic? 
7
Culverted 
Streams?
 
8
Additional Chara
cteristics
Sewer Repair 
Nearby?
Urbanized Area DCIA >11% Impaired Waterbody
Additional 
Characteristics 
Score
Catchment 
inspections and 
sample results
GIS Maps Municipal Staff
Impaired 
Waters List
Land Use/GIS 
Maps, Aerial 
Photography
Land Use Information, 
Visual Observation
Municipal Staff, 
GIS Maps
Land Use, 
Municipal 
Staff
GIS and Storm 
System Maps
Other
Municipal Staff, GIS 
Maps
CLEAR
Nathan L. Jacobson & 
Associates
CLEAR
Other
Yes = 3 (Pr
oblem 
Catchm
ent)
Yes = 3 Freque
nt = 3 Poor = 3 High = 3
High = 3
Yes = 3 Yes = 3 Yes = 3
Yes=2
Yes =1
Yes =1
Yes =1
High = 3
No = 0
No = 0 Occasional = 2 Fair = 2 Medium = 2 Medium = 2 No = 0 No = 0 No = 0
No=0
No = 0
No = 0
No = 0 Medium =1-2
None = 0 Good = 0 Low = 1
Low = 1
Low = 0
Score
Priority Ranking
                   
Low Priority:
 0-5                             
Problem
: 6-9                                     
High Prior
ity
: ≥10
Information Source
Scoring Criteria
Description
4320
-08-1 Mountain Brook
0
0
1
2
0
0
Mostly wooded with light 
residential areas and a natual 
diversity area in Northeast 
corner of catchment.
2
0
0
0
1
6 Problem
4320-09-1
Dismal Brook; unnamed 
ponds
0
0
1
2
0
3
Mostly woode
d with light 
residen
tial areas and cleared 
land
1
0
0
1
8 Problem
43
20-10-1 West Branch Salmon Brook
0
0
2
2
0
3
Mostly Residential
2
1
0
0
2
12 High Priority
4320-10-2-R1 West Branch Salmon Brook
0
0
1
1
0
0
Wooded
2
0
0
1
0
5 Low Priority
4320-11-1 Salmon Brook
0
0
2
2
0
0
Agricultural
2
0
0
0
1
7 Problem
4320-12-1 Bradley Brook
0
0
2
2
0
3
Mostly residential with some 
cleared land and wooded 
areas; Intermediate School
2
1
0
0
2
12 High Priority
4320-12-2-R1 Salmon Brook
0
0
1
1
0
0
Wooded
0
0
0
0
2 Low Priority
4320-13-1 Salmon Brook
3
0
1
1
0
3
Wooded with some 
residential; recreational lake 
in NE catchment
0
0
0
1
9 Problem
4320-13-1-L1
Manitook Lake; Unnamed 
Stream
3
0
2
2
0
0
Commercial 
(Masonry/Concrete quarry); 
recreational (Lake)
2
1
0
0
3
13 High Priority
4320-14-1 Kendall Brook
0
0
2
2
0
3
Residential with some 
comme
rcial including a school. 
2
1
0
0
3
13 High Prior
ity
4320-15-2-R1 Hungary Brook
0
0
2
2
0
3
Moslty residential with one 
large farm and some cleared 
land
1
0
0
2
10 High Priority
4320-15-3-R1 Salmon Brook
0
0
2
2
0
3
Residential with some cleared 
land
2
1
0
0
2
12 High Priority
4320-16-1
Beaverdam Marsh, Great 
Marsh, unnamed stream, 
Newgate Pond
0
0
1
2
0
3
Mostly wooded with light 
residetntial areas along 
Copper Hill Rd. 
2
1
0
0
1
10 Problem
4320-17-1 Unnamed Stream
0
0
2
2
0
3
Mostly residential with some 
cleared land and minimal 
agricultural land
2
1
0
0
2
12 High Priority
Page 5 of 6

Page 242

Town of Granb
y
Catchment Assessment 
and
Priority Ranking Matrix
Catc
hment ID Receiving Water
Previous Screening 
Results Indicate 
Likely Sewer Input? 
1
Discharging to 
Area of Concern
 
to Public Health? 
2
Frequ
ency of 
Past Discharge 
Complaints
Receiving 
Water 
Quality 
3
Density of 
G
enerating Sites 
4
Age of Develo
pment/ 
Infrastructure 
5
Historic 
Combin
ed 
Sewers or 
Septic?
 
6
Aging 
Sep
tic? 
7
Culverted 
Streams?
 
8
Additional Chara
cteristics
Sewer Repair 
Nearby?
Urbanized Area DCIA >11% Impaired Waterbody
Additional 
Characteristics 
Score
Catchment 
inspections and 
sample results
GIS Maps Municipal Staff
Impaired 
Waters List
Land Use/GIS 
Maps, Aerial 
Photography
Land Use Information, 
Visual Observation
Municipal Staff, 
GIS Maps
Land Use, 
Municipal 
Staff
GIS and Storm 
System Maps
Other
Municipal Staff, GIS 
Maps
CLEAR
Nathan L. Jacobson & 
Associates
CLEAR
Other
Yes = 3 (Pr
oblem 
Catchm
ent)
Yes = 3 Freque
nt = 3 Poor = 3 High = 3
High = 3
Yes = 3 Yes = 3 Yes = 3
Yes=2
Yes =1
Yes =1
Yes =1
High = 3
No = 0
No = 0 Occasional = 2 Fair = 2 Medium = 2 Medium = 2 No = 0 No = 0 No = 0
No=0
No = 0
No = 0
No = 0 Medium =1-2
None = 0 Good = 0 Low = 1
Low = 1
Low = 0
Score
Priority Ranking
                   
Low Priority:
 0-5                             
Problem
: 6-9                                     
High Prior
ity
: ≥10
Information Source
Scoring Criteria
Description
4320
-17-2-R1 Unnamed Stream
0
0
1
1
0
3
Wooded with some rural 
residential areas
0
0
0
1
6 Problem
4320-17-3-R1 Salmon Brook
0
0
1
1
0
0
Wooded with some 
agriculture
0
0
0
1
3 Low Priority
4320-21-1 Salmon Brook
0
0
1
2
0
0
Agricultura
l with some 
wooded
0
0
0
1
4 Problem
43
20-21-1-L1
Salmon B
rook; Sumatra 
Pond
0
0
2
2
0
0 Comme
rcial and Agricultural
1
0
0
3
8 Problem
4320-22-1 Unnamed Stream
0
0
1
2
0
3
Mostly Agricultural with some 
wooded and minimal 
residential 
1
0
0
2
9 Problem
4320-26-1-L1 Salmon Brook
0
0
2
2
0
0 Agricultural and Residential
2
1
0
0
2
9 Problem
Scoring Criteria:
1
 Previous screen
ing results indicate likely sewer input if any of the following are true:

    
    
Olfactory o
r visual evidence of sewage,

    
    
Ammo
nia ≥ 0.5 mg/L, surfactants ≥ 0.25 mg/L, and bacteria levels greater than the water quality criteria applicable to the receiving water, or

    
    
Ammo
nia ≥ 0.5 mg/L, surfactants ≥ 0.25 mg/L, and detectable levels of chlorine
2
 Catchm
ents that discharge to or in the vicinity of any of the following areas: public beaches, recreational areas, drinking water supplies, or shellfish beds
3
 Receiving water
 quality based on latest version of State of Connecticut Integrated Water Quality Report.
Page 6 of 6

Page 243

APPENDIX
H SLOPE
PROTECTION
AND SWALE
CALCULATIONS

Page 244

PROJECT: Computed by: EAR 10/9/2025
PROJECT NO.: Checked By:  SDG 10/13/2025
TOWN:
ROUTE:
10 Year Design Storm is being used for the Velocity Calculations
Location: 
Q  Bypass Flow (CFS) = 0.770
A  Area of Flow Section (SF) = 4.343
V  Velocity of Flow (FPS) = 3.344
3.34 FPS
Location: 
Q  Bypass Flow (CFS) = 0.200
A  Area of Flow Section (SF) = 2.843
V  Velocity of Flow (FPS) = 0.569
0.57 FPS
*Q=A*V
PASSES FOR ALLOWABLE VELOCITY (GRAVEL)
PASSES FOR ALLOWABLE VELOCITY (GRAVEL)
STA 12+14.00, 15.00 RT
*Value from ORD Drainage Model for 10 yr Storm
*Spread; Value from Gutter Flow Analysis
SIMSBURY RD OVER WEST 
BRANCH SALMON BROOK
0055-0145
Granby, CT
Simsbury Road
Allowable Velocities for Various Soil Textures
STA 12+71.00, 15.00 LT
*Value from ORD Drainage Model for 10 yr Storm
*Spread; Value from Gutter Flow Analysis
*Q=A*V

Page 245

PROJECT: Computed by: EAR 10/9/2025
PROJECT NO.: Checked By:  SDG 10/13/2025
TOWN:
ROUTE:
(Temporary lining requires 2-year design, 10-year being used for conservative analysis)
Location: 
DESIGN (10-yr)
Input into Flowmaster, Triangular Channel Worksheet, solve for normal depth:
Roughness Coefficient = 0.02
S, Channel Slope (ft/ft) = 0.04
Left Side Slope (H:V) = 6
Right Side Slope (H:V) = 6
Discharge (cfs) = 1.13
Output from Flowmaster:
A, Flow Area (sf) = 0.30
R, Hydraulic Radius (ft) = 1.400
V, Velocity (fps) = 3.51
d, Depth (ft) = 0.23
γ, Unit Weight of Water (lb/cf) = 62.4
τ, Average Shear (lb/sf) = 3.49
τd, Max Shear (lb/sf) = 0.58
Location: 
DESIGN (10-yr)
Roughness Coefficient =
S, Channel Slope (ft/ft) = 
Left Side Slope (H:V) =
Right Side Slope (H:V) =
Discharge (cfs) = 
Output from Flowmaster:
A, Flow Area (sf) =
R, Hydraulic Radius (ft) = 
V, Velocity (fps) = 
d, Depth (ft) = 
γ, Unit Weight of Water (lb/cf) = 62.4
τ, Average Shear (lb/sf) = 0.00
τd, Max Shear (lb/sf) = 0.00
16+31.00, 21.00 RT
**Assume Type G
SIMSBURY RD OVER WEST 
BRANCH SALMON BROOK
0055-0145
Granby, CT
Simsbury Road
Swale Shear

Page 246

Worksheet for Triangular Swale - STA 18+15 TO STA 16+31
Project Description
Manning 
FormulaFriction Method
Normal DepthSolve For
Input Data
0.020Roughness Coefficient
ft/ft0.040Channel Slope
H:V6.000Left Side Slope
H:V6.000Right Side Slope
cfs1.13Discharge
Results
in2.8Normal Depth
ft²0.3Flow Area
ft2.8Wetted Perimeter
in1.4Hydraulic Radius
ft2.78Top Width
in3.5Critical Depth
ft/ft0.011Critical Slope
ft/s3.51Velocity
ft0.19Velocity Head
ft0.42Specific Energy
1.815Froude Number
SupercriticalFlow Type
GVF Input Data
in0.0Downstream Depth
ft0.0Length
0Number Of Steps
GVF Output Data
in0.0Upstream Depth
N/AProfile Description
ft0.00Profile Headloss
ft/sInfinityDownstream Velocity
ft/sInfinityUpstream Velocity
in2.8Normal Depth
in3.5Critical Depth
ft/ft0.040Channel Slope
ft/ft0.011Critical Slope
Page 1 of 127 Siemon Company Drive Suite 200 W  
Watertown, CT 06795 USA  +1-203-755-1666
10/15/2025
FlowMaster
[10.03.00.03]
Bentley Systems, Inc.  Haestad Methods Solution  
Center0055-01145 Swale Calculations.fm8

Page 247

 APPENDIX 
 
I OUTLET 
PROTECTION 
CALCULATIONS 

Page 248

PROJECT: Computed by: EAR 10/9/2025
PROJECT NO.: Checked By:  SDG 10/14/2025
TOWN:
ROUTE:
Length: 
Per CTDOT Drainage Manual Section 11.13.5
SIMSBURY RD OVER WEST 
0055-0145
Granby, CT
Simsbury Road
Outlet Protection
Type C riprap apron recommended due to assumed defined vegetation downstream of outlet protection.
Location: STA 17+89.00, 20.00' LT
1 of 5

Page 249

PROJECT: Computed by: EAR 10/9/2025
PROJECT NO.: Checked By:  SDG 10/14/2025
TOWN:
ROUTE:
SIMSBURY RD OVER WEST 
0055-0145
Granby, CT
Simsbury Road
Outlet Protection
Type C riprap apron recommended due to assumed defined vegetation downstream of outlet protection.
Location: STA 17+89.00, 20.00' LT
DESIGN (10-yr) Check (25-yr)
Q (cfs) = 1.72 2.07
Sp (ft) = 1.5 1.5
La (ft) = 4.64 5.22
Width:
**SAY 12' based on min length for 18"
2 of 5

Page 250

PROJECT: Computed by: EAR 10/9/2025
PROJECT NO.: Checked By:  SDG 10/14/2025
TOWN:
ROUTE:
SIMSBURY RD OVER WEST 
0055-0145
Granby, CT
Simsbury Road
Outlet Protection
Type C riprap apron recommended due to assumed defined vegetation downstream of outlet protection.
Location: STA 17+89.00, 20.00' LT
3 of 5

Page 251

PROJECT: Computed by: EAR 10/9/2025
PROJECT NO.: Checked By:  SDG 10/14/2025
TOWN:
ROUTE:
SIMSBURY RD OVER WEST 
0055-0145
Granby, CT
Simsbury Road
Outlet Protection
Type C riprap apron recommended due to assumed defined vegetation downstream of outlet protection.
Location: STA 17+89.00, 20.00' LT
DESIGN (10-yr) Check (25-yr)
Q (cfs) = 1.72 2.07
Sp (ft) = 1.50 1.50
Rp (ft) = 1.50 1.50
Z = 1.00 1.00
TWE (ft) = 0.32 0.35
Cb (ft) = 3.00 3.00
W (ft) = 3*Sp 4.50 4.50
W (ft) = 2(Z)(TWE+1')+Cb 5.64 5.70
W (ft) = 2(Z)(0.7Rp)+Cb 5.10 5.10
Max W (ft) = 5.64 5.70 **SAY 6' 
Riprap:
Input into Flowmaster, Trapezoidal Channel Worksheet, solve for normal depth:
DESIGN (10-yr) Check (25-yr)
Roughness Coefficient = 0.069 0.069
S, Channel Slope (ft/ft) = 0.05 0.05 n for d50 of 6" (Modified)= 0.069
Left Side Slope (H:V) = 2.0 2.0 n for d50 of 8" (Intermediate) = 0.072
Right Side Slope (H:V) = 2.0 2.0 n for d50 of 12" = 0.078
B, Bottom Width (ft) = 3.00 3.00
Discharge (cfs) = 1.72 2.07
Output from Flowmaster:
A, Flow Area (sf) = 1.00 4.90
R, Hydraulic Radius (ft) = 0.225 0.625
V, Velocity (fps) = 1.80 0.50
d, Depth (ft) = 0.267 0.300
γ, Unit Weight of Water (lb/cf) = 62.4 62.4
τ, Average Shear (lb/sf) = 0.70 1.95
τd, Max Shear (lb/sf) = 0.83 0.94
Figure 7-9:
B/d = 11.25 10.00
Z = 2.0 2.0
K1 = 0.79 0.79
Test for modified riprap
4 of 5

Page 252

PROJECT: Computed by: EAR 10/9/2025
PROJECT NO.: Checked By:  SDG 10/14/2025
TOWN:
ROUTE:
SIMSBURY RD OVER WEST 
0055-0145
Granby, CT
Simsbury Road
Outlet Protection
Type C riprap apron recommended due to assumed defined vegetation downstream of outlet protection.
Location: STA 17+89.00, 20.00' LT
Figure 7-10:
Θ, Angle of Side Slope (°) = 26.6 26.6
φ, Angle of Repose (°) = 41.5 41.5
K2 = 0.74 0.74
τs, Side Shear (lb/sf) = 0.89 1.00 Recommend modified riprap
Test for modified riprap
5 of 5

Page 253

Worksheet for Type C Apron STA 17+89.00, 20.00' LT- 10yr
Project Description
Manning 
FormulaFriction Method
Normal DepthSolve For
Input Data
0.069Roughness Coefficient
ft/ft0.050Channel Slope
H:V2.000Left Side Slope
H:V2.000Right Side Slope
ft3.00Bottom Width
cfs1.72Discharge
Results
in3.2Normal Depth
ft²1.0Flow Area
ft4.2Wetted Perimeter
in2.7Hydraulic Radius
ft4.08Top Width
in2.5Critical Depth
ft/ft0.126Critical Slope
ft/s1.80Velocity
ft0.05Velocity Head
ft0.32Specific Energy
0.653Froude Number
SubcriticalFlow Type
GVF Input Data
in0.0Downstream Depth
ft0.0Length
0Number Of Steps
GVF Output Data
in0.0Upstream Depth
N/AProfile Description
ft0.00Profile Headloss
ft/s0.00Downstream Velocity
ft/s0.00Upstream Velocity
in3.2Normal Depth
in2.5Critical Depth
ft/ft0.050Channel Slope
ft/ft0.126Critical Slope
Page 1 of 127 Siemon Company Drive Suite 200 W  
Watertown, CT 06795 USA  +1-203-755-1666
10/15/2025
FlowMaster
[10.03.00.03]
Bentley Systems, Inc.  Haestad Methods Solution  
Center0055-0145 Riprap Outlet Type C Calculations.fm8

Page 254

Worksheet for Type C Apron STA 17+89.00, 20.00' LT - 25yr
Project Description
Manning 
FormulaFriction Method
Normal DepthSolve For
Input Data
0.069Roughness Coefficient
ft/ft0.050Channel Slope
H:V2.000Left Side Slope
H:V2.000Right Side Slope
ft3.00Bottom Width
cfs2.07Discharge
Results
in3.6Normal Depth
ft²1.1Flow Area
ft4.3Wetted Perimeter
in3.0Hydraulic Radius
ft4.20Top Width
in2.8Critical Depth
ft/ft0.122Critical Slope
ft/s1.91Velocity
ft0.06Velocity Head
ft0.36Specific Energy
0.663Froude Number
SubcriticalFlow Type
GVF Input Data
in0.0Downstream Depth
ft0.0Length
0Number Of Steps
GVF Output Data
in0.0Upstream Depth
N/AProfile Description
ft0.00Profile Headloss
ft/s0.00Downstream Velocity
ft/s0.00Upstream Velocity
in3.6Normal Depth
in2.8Critical Depth
ft/ft0.050Channel Slope
ft/ft0.122Critical Slope
Page 1 of 127 Siemon Company Drive Suite 200 W  
Watertown, CT 06795 USA  +1-203-755-1666
10/15/2025
FlowMaster
[10.03.00.03]
Bentley Systems, Inc.  Haestad Methods Solution  
Center0055-0145 Riprap Outlet Type C Calculations.fm8

Minutes: archived copy, SHA-256 7c480914dc42…. Agenda: archived copy, SHA-256 3c7774eb665f…. Packet: sanitized copy, SHA-256 9281b4676c8c….