Towns / Granby / Inland Wetlands & Watercourses Commission / Feb 11, 2026
Inland Wetlands & Watercourses Commission, Feb 11, 2026
Granby Inland Wetlands & Watercourses Commission Hide agendas that already have minutesDocuments
| Type | Document | Pages | Open |
|---|---|---|---|
| minutesminutes | IWWC Minutes | 2 | PDF download · town site |
| agenda | IWWC Agenda | 1 | PDF download · town site |
| packetpacket | IWWC Meeting Packet Sanitized copy: scripts and attachments were removed and the result checked. The original is kept offline. Not attached: this packet is 48 MB, too large to host here. Use the town site link. |
254 | town site |
Summary of the minutes
AI-generated summary. Each line links to the PDF page it came from; check it before relying on it.
Read the official minutes (PDF, 2 pages) The PDF is the record; this summary is a guide to it.
The Commission approved the January 14, 2026 minutes and voted to receive the Simsbury Road Bridge permit application and schedule a public hearing for March 11, 2026. It also continued the 142R and 186 Case Street agenda item to the next regular meeting at the applicant's request.
Decisions (4) · all reported votes
- Approval of January 14, 2026 minutes
Approved as presented
Vote: Motion by F. Jones, second by S. Okie, voted 6-0-0 · p. 1 - Simsbury Road Bridge replacement over West Branch of Salmon Brook - Town of Granby permit request
Application received and public hearing scheduled for the next regular meeting on March 11, 2026, at 7:00 p.m. due to public interest and significant impact
Vote: Motion by V. Dirienzo, second by F. Jones, voted 6-0-0 · p. 1 - 142R and 186 Case Street - M. Reale c/o Scottinaleece, LLC (regulated activity without valid IWWC permit)
Agenda item continued to the next regular meeting at the request of the attorney for the property owner; Dam Safety submission extended to 3/6/2026
Vote: Motion by D. Tolli, second by F. Jones, voted 6-0-0 · p. 2 - Adjournment
Meeting adjourned at 7:45 p.m.
Vote: Motion by V. Dirienzo, second by N. Dethlefsen, voted 6-0-0 · p. 2
Also discussed (1)
- Commissioner Reports: J. Laudati temporary structure and approved RFR amendment: K. Bednaz indicated that the approved RFR for the run-shed shed can be amended to reflect the addition of the temporary structure; no vote recorded · p. 2
Summary of the agenda: IWWC Agenda
AI-generated summary.
This is the agenda for the Granby Inland Wetlands and Watercourses Commission's February 11, 2026 hybrid meeting. It lists the minutes of January 14, 2026 for action, a permit request for the Simsbury Road Bridge replacement (to be received), and an agent update on 142R and 186 Case Street.
On the agenda (3)
- Action on the minutes of January 14, 2026 · p. 1
- Permit request: Simsbury Road Bridge replacement over the West Branch of Salmon Brook (Town of Granby): (to be received) · p. 1
- Agent Report: 142R and 186 Case Street (M. Reale c/o Scottinaleece, LLC), conducting a regulated activity without a valid IWWC permit; Dam Safety submission extended to 3/6/2026: (update) · p. 1
Full text of the documents
View the minutes PDF on this page (IWWC Minutes)
Text of the minutes (IWWC Minutes, 2 pages)
Page 1 · open in PDF
1 MEETING MINUTES Town of Granby Inland Wetlands and Watercourses Commission Wednesday, February 11, 2026, at 7:00 pm PRESENT: Nick Dethlefsen, David Tolli, Susan Okie, John Laudati, Fred Jones, and Vickie Dirienzo ALSO PRESENT: IWWC Agent Kate Bednaz and Land Use Coordinator Renee Deltenre (Zoom) 1. Call to Order Chair Laudati called the meeting to order at 7:01 p.m. 2. Action on the minutes of January 14, 2026 ON A MOTION by F. Jones seconded by S. Okie, the Commission voted 6-0-0 to approve the January 14, 2026, minutes as presented. 3. Permit Requests a. Simsbury Road Bridge – Town of Granby – Permit request for the proposed Simsbury Road Bridge replacement over the West Branch of Salmon Brook within a regulated area. Engineer John Wengell of CHA Solutions was present on behalf of the town to discuss the application. The Town of Granby is seeking to replace the existing two-span, 111- foot bridge, which was built in 1956. The current bridge has a curb-to-curb width of 22 feet, carries bi-directional traffic in a northerly/southerly direction, and the width of the existing bank is 56 feet. J. Wengell ran through existing conditions and the proposed replacement. The new structure will be comprised of 48.5-inch-deep steel beams with a concrete deck, two, 10-foot travel lanes, and two, 5-foot shoulders. Curb-to-curb width will be 30 feet and overall length will be 105 feet with a 43-degree skew. J. Wengell noted that the existing center abutment will be removed, riprap will be placed along the substructure and toe boulders will be placed at the embankments. A plan overview was presented for the proposed traffic detour, water handling and site restoration, including total temporary and permanent wetland and watercourse impacts. The anticipated start date is spring of 2027, and selected trees must be cut prior to April 14th due to ecological concerns. K. Bednaz provided some feedback on the application, and requested additional information on the dewatering staging area and discharge, wetland resource areas, the mean high-water line and how that elevation relates to the shelf being created, etc. The Commission discussed whether to hold a public hearing on the application. ON A MOTION by V. Dirienzo seconded by F. Jones, the Commission voted 6-0-0 to receive the application and schedule a public hearing for the next regular meeting on March 11, 2026, at 7:00 p.m. due to public interest and significant impact.
Page 2 · open in PDF
2 4. Agent Report and Correspondence a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated Activity without a valid IWWC Permit. Dam Safety submission extended to 3/6/2026. Attorney Timothy Furey was present on behalf of the property owner to provide updates. He stated that many of the items necessary to correct the violation and satisfy requirements of DEEP and the Town are on hold due to the weather. In addition to Soil Scientist David Lord, the property owner has retained Kratzert Jones & Associates, Inc. to complete mapping pertaining to the pond and impoundment, and Karl Acimovic, P.E. & L.S. to assist with the requirements outlined by DEEP. Attorney Furey will continue to work with Attorney Brooks and requested to continue this agenda item to the next meeting so that updates can be presented to the Commission. Other than maintaining erosion and sediment control measures, no work is occurring onsite. Attorney Furey stated for the record that the Law Firm of Murphy, Laudati, Kiel & Rattigan, LLC, represented the sale of this property and the potential for a conflict of interest for J. Laudati should be evaluated. ON A MOTION by D. Tolli seconded by F. Jones, the Commission voted 6-0-0 to continue this agenda item to the next regular meeting. 5. Commissioner Reports and Correspondence J. Laudati indicated that he recently installed a temporary structure on his property to provide shelter for his animals, as they are unable to use the existing run-shed shed due to weather conditions. K. Bednaz indicated that the approved RFR for the run-shed shed can be amended to reflect the addition of the temporary structure. 6. Adjourn ON A MOTION by V. Dirienzo seconded by N. Dethlefsen, the Commission voted 6-0-0 to adjourn the meeting at 7:45 p.m. Respectfully submitted, Renee Deltenre Land Use Coordinator
View the agenda PDF on this page (IWWC Agenda)
Text of the agenda (IWWC Agenda, 1 page)
Page 1 · open in PDF
Please note: Any person who wishes to provide materials for display on the video monitors at an IWWC meeting where such monitors are being used to videoconference the meetings must email the materials no later than 10 AM on the day of the meeting. All materials must be contained in a single attachment to the email. Materials received after the 10 AM deadline will not be accepted for display. Display of the materials is subject to all other rules and procedures of the IWWC. Zip drive, memory sticks and other data storage devices will not be accepted. AGENDA Regular Hybrid Meeting Town of Granby Inland Wetlands and Watercourses Commission Wednesday, February 11, 2026, at 7:00 pm Town Hall Meeting Room Live Stream Under “Shows and Spotlight”: www.gctv16.org Zoom: https://us02web.zoom.us/j/89675080345?pwd=XpZISGMbRaEVkC0gxggagOOCI3cUqh.1 Call In: 929-205-6099 Meeting ID: 896 7508 0345 Passcode: 717619 1. Call to Order 2. Action on the minutes of January 14, 2026 3. Permit Requests a. Simsbury Road Bridge – Town of Granby – Permit request for the proposed Simsbury Road Bridge replacement over the West Branch of Salmon Brook within a regulated area. (To be received) 4. Agent Report and Correspondence a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated Activity without a valid IWWC Permit. Dam Safety submission extended to 3/6/2026. 5. Commissioner Reports and Correspondence 6. Adjourn
Text of the packet (IWWC Meeting Packet, 254 pages)
Page 1
Please note: Any person who wishes to provide materials for display on the video monitors at an IWWC meeting where such monitors are being used to videoconference the meetings must email the materials no later than 10 AM on the day of the meeting. All materials must be contained in a single attachment to the email. Materials received after the 10 AM deadline will not be accepted for display. Display of the materials is subject to all other rules and procedures of the IWWC. Zip drive, memory sticks and other data storage devices will not be accepted. AGENDA Regular Hybrid Meeting Town of Granby Inland Wetlands and Watercourses Commission Wednesday, February 11, 2026, at 7:00 pm Town Hall Meeting Room Live Stream Under “Shows and Spotlight”: www.gctv16.org Zoom: https://us02web.zoom.us/j/89675080345?pwd=XpZISGMbRaEVkC0gxggagOOCI3cUqh.1 Call In: 929-205-6099 Meeting ID: 896 7508 0345 Passcode: 717619 1. Call to Order 2. Action on the minutes of January 14, 2026 3. Permit Requests a. Simsbury Road Bridge – Town of Granby – Permit request for the proposed Simsbury Road Bridge replacement over the West Branch of Salmon Brook within a regulated area. (To be received) 4. Agent Report and Correspondence a. Update re: 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated Activity without a valid IWWC Permit. Dam Safety submission extended to 3/6/2026. 5. Commissioner Reports and Correspondence 6. Adjourn
Page 2
Page 3
1 MEETING MINUTES Town of Granby Inland Wetlands and Watercourses Commission Wednesday, January 14, 2026, at 7:00 pm PRESENT: Nick Dethlefsen, Dave Tolli, Sue Okie, John Laudati, Fred Jones, and Aurelle Locke PRESENT VIA ZOOM: Vickie Dirienzo ALSO PRESENT: IWWC Agent Kate Bednaz, Director of Community Development Abby Kenyon 1. Call to Order Chair Laudati called the meeting to order at 7:01 p.m. 2. Action on the minutes of December 10, 2025 ON A MOTION by A. Locke, seconded by F. Jones, the Commission voted 6-0-0 to approve the December 10, 2025, minutes as presented. 3. Town Attorney Presentation re: Land Use Commission Training Attorneys Rich Roberts and Ken Slater presented to the Commission. The presentation included an overview of the Inland Wetlands and Watercourses Act, Commission jurisdiction, and enforcement procedures. An overview of meeting and hearing procedures was also provided, including when a public hearing is required, procedures for site visits, and information about ex-parte communication. The presentation included information about feasible and prudent alternatives and the basis for Commission decisions. The presentation was followed by Commissioner questions and answers. 4. Enforcement Order a. 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated Activity without a valid IWWC Permit. K. Bednaz reported that at the last meeting, the property owner’s attorney cited the Wray case, noting that the IWWC enforcement is put on hold while DEEP determines their jurisdiction over the dam. The Town Attorney was consulted, and a memo included in the meeting packet. Per the Town Attorney’s memo, the IWWC can maintain jurisdiction over the activities conducted on the property, with the exception of the dam, while DEEP considers that. It was staff’s recommendation that the Enforcement Order be modified to remove reference to the dam, so the IWWC can continue enforcement activities on the other site activities that have occurred. The Commission reviewed the November 5, 2025 Enforcement Order and discussed items #1 and #2 in detail. It was decided to modify item #1 to exclude items related to the dam construction that may be under DEEP’s jurisdiction and to put item #2 on hold pending DEEP’s determination of jurisdiction. For item #1, the following language was suggested to be added, “Evaluations associated with the earthen dam and associated water control structure, including any directly adjacent resource areas may be addressed upon DEEP’s pending review of the dam structure and its jurisdiction. If the dam is deemed by DEEP to be subject to municipal review, all information as outlined in item #1 of this enforcement order must be submitted within 30 days of the notification of DEEP’s decision.” ON A MOTION by S. Okie, seconded by A. Locke, the Commission voted 5-0-1 to modify item #1 in the Enforcement Order issued November 5, 2025 to add the revised language as discussed. D. Tolli abstained. ON A MOTION by S. Okie, seconded by F. Jones, the Commission voted 6-0-0 to put a stay on item #2 in the Enforcement Order issued November 5, 2025 pending DEEP’s review of jurisdiction.
Page 4
2 5. Agent Report and Correspondence a. 65 Cider Mill Heights – N. Goggin c/o Pool Boy Pools – Permit request to install a 28’ x 44’ inground swimming pool inclusive of patio and associated site improvements within a regulated area. Authorized Agent approval 1/7/26. K. Bednaz reported that an application to construct an inground pool was approved for 65 Cider Mill Heights. The approval includes a patio around the pool, fence, and other associated pool equipment. She reported that the proposed pool is located to the rear of the house in an area that is currently lawn. The location is in the upland review area. K. Bednaz reported that there will be E&S measures in place. In response to questions, K. Bednaz explained that a concern with pools in the upland review area can be the discharge/emptying of the pool and impact of chlorine and pool chemicals on the resource area. It was noted in this case this could be done to the front of the house and the pool water could infiltrate the soil. In response to a question about chemical storage, it was noted that the property owner will most likely store these inside a structure and they won’t be exposed to the elements. K. Bednaz reported that she visited Station 280, 280 Salmon Brook Street, site in December. Debris and garbage had been removed. Another site walk will be schedule for the spring to close out the project. K. Bednaz reported that a potential applicant met informally with the Planning and Zoning Commission to discuss potential development plans for 37 Hartford Avenue. K. Bednaz has been in contact with the potential applicant and referred them to the application file to review previous submissions. K. Bednaz reported that the potential applicant asked about an informal discuss with the Commission. It was noted that an informal discussion may be held once more concrete plans are developed and the effluent information from the septic system is determined. 6. Commissioner Reports and Correspondence N. Defthlefsen noted that he read an article about the solar project on the Monrovia property and plans for horizontal drilling. In response to a question, A. Kenyon noted that project will be submitted to the Siting Council and the Town will have an opportunity to review the plans. No plans have been submitted at this time. 7. Adjourn ON A MOTION by S. Okie seconded by F. Jones, the Commission voted 6-0-0 to adjourn the meeting at 8:32 p.m. Respectfully submitted, Abby Kenyon Director of Community Development
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Federal Local Bridge Program: Bridge No. 04525 Town of Granby IWWC Permit February 2026 CT DEEP Reporting Form
Page 11
Page 12
Federal Local Bridge Program: Bridge No. 04525 Town of Granby IWWC Permit February 2026 Project Description
Page 13
Federal Local Bridge Program: Bridge No. 04525 Town of Granby IWWC Permit February 2026 1 PROJECT DESCRIPTION State P.E. Project Number: 0055-0145 State Construction Project Number: 0055-0145 Town/City: Granby Bridge Number: 04525 Simsbury Road over the West Branch of Salmon Brook Project Need and Description: Bridge No. 04525 was originally constructed in 1956. The existing bridge is a two-span structure comprised of five prestressed concrete I-beams with concrete deck supported on full height concrete abutments with spread footings founded on bedrock. The bridge is located approximately 1,000’ north of Firetown Road in the Town of Granby. The structure features a 43-degree skew with each span measuring 50’-10” between center line of bearings and an overall length of 111-0”. The out-to-out width of the bridge is 25’-6” and the bridge’s roadway curb-to-curb width is 22’-0”. The two-lane roadway is classified as a Rural Minor Collector, and the average daily traffic is 1,300 vehicles (2022) with 3.6% truck traffic as reported on the CTDOT “Traffic Monitoring Count Data” web page. The replacement of Bridge No. 04525 is necessary based on its substandard roadway width. The deck geometry rating of 3 indicates that the structure is not wide enough to accommodate the recorded ADT. With approximately 70 years since construction, the bridge has reached the end of its 50-75 service life. Additionally, prestressing strands at the ends of the concrete I-beams are exposed and rusted, the abutment and pier concrete bearing pads have large spalls and hollow areas, and the bridge rail does not meet current safety standards. Bridge No. 04525 is currently in the semi-final engineering phase under the Connecticut Department of Transportation (CTDOT) Federal Local Bridge Design Managed by State Program for structures requiring rehabilitation. Mapping: Site maps are attached. Photos: Site photos are attached. Proposed Project: The proposed project will include the full replacement of the existing bridge with a new superstructure, providing two 10-foot travel lanes and two 5-foot shoulders (to accommodate bike lanes at the Town’s request) for a curb-to- curb width of 30 feet. The new 105’-0” single span superstructure will be comprised of metallized steel girders with a reinforced concrete deck and supported by reinforced concrete abutments and wingwalls. The proposed single span meets the 1.2 bankfull width requirement and proposes removing the pier from the watercourse. The southerly abutment will be supported by micropiles rock socketed into bedrock, while the northerly abutment will be founded directly on bedrock. New open bridge rail and approach guiderails that meet current safety standards will be installed. Approximately 100 feet of mill & overlay and 925 feet of full depth pavement reconstruction at the approaches is also proposed, most notably to remedy substandard highway deficiencies at the curve just north of the bridge. The existing pier, abutments and wingwalls will be removed in their entirety. A double row of toe boulders is proposed to line the streambank where the pier is removed and will tie into existing grade both upstream and downstream of the new bridge. Riprap scour protection will be proposed for the abutments and embankments and will consist of a 36” deep layer of standard riprap. This riprap will be buried with one foot of natural streambed material below the ordinary-high-water line along the southerly abutment. The proposed riprap along the embankments will be top dressed with natural material as requested by the National Park Service (NPS) and CT
Page 14
Federal Local Bridge Program: Bridge No. 04525 Town of Granby IWWC Permit February 2026 2 DEEP Fisheries. Deposited material underneath the bridge and streambed material will be stockpiled and re-used after grading. Disturbed areas will be topsoiled seeded and for slopes 3:1 or steeper erosion control matting will be installed for erosion protection. Native tree and shrub species will be planted in the disturbed areas as well as wetland and conservation seed mixes. The wetland seed mix is proposed for areas disturbed within the wetlands and the conservation seed mix will be proposed for areas above the wetland limits along the embankments and roadway. For areas directly adjacent to maintained residential lawns, a lawn mixed will be proposed. Environmental Resources: A certified soil scientist has delineated wetlands to map the limits of state and federally regulated wetlands at the project site (Please refer to the attached Soils Report). The project site is located within a Natural Diversity Database screening area per December 2025 mapping and CT DEEP Best Management Practices (BMPs) will be incorporated into the contract documents. The West Branch of the Salmon Brook at Bridge No. 04525 is part of the West Branch Salmon River Sub-Regional Basin No. 4319 which has a drainage area of approximately 16 square miles. This river is also a part of the National Wild and Scenic River system. The ground water supply surrounding the structure is classified GA whose designated uses are existing private and potential public or private supplies suitable for drinking without treatment. The surface water in the structure’s vicinity is designated as Class A, is suitable for fish, and other aquatic life and wildlife; potential drinking water supplies; recreation; navigation; and water supply for industry and agriculture. Floodplain: A FEMA Floodplain Zone AE is present upstream of the structure however limit of detailed study ends just before the bridge. The floodplain exhibited in the permit plans is the Existing 100-Year Flood Elevation (Calculated). Stormwater (ground disturbance): Ground disturbance is anticipated to be greater than one acre due to planned roadway reconstruction, temporary utility relocation, and planned water handling. A debris shield will be installed for the removal of the superstructure. Temporary cofferdams and water-handling-cofferdams will be installed around the pier and abutments to allow for removal and construction of the substructure elements in the dry. Tree removal will be required for construction and the temporary utility relocation; however, disturbed areas will be restored after construction completion. Sediment and Erosion Control: All construction activities will be conducted in accordance with the Department’s Standard Specifications for Roads, Bridges, and Incidental Construction, Form 819 Section 1.10 and will also follow required Best Management Practices ( BMPs) and sediment and erosion control measures in accordance with the DEEP Connecticut Guidelines for Erosion and Sedimentation Control and the DEEP Connecticut Storm Water Quality Manual. Additional Information: Bridge No. 04525 is located within aa agricultural and residential area. The proposed maintenance and protection of traffic will involve a full closure of Simsbury Road at the bridge and a detour of traffic for approximately 8 months. The proposed detour route is approximately 7 miles long and will utilize Day Street, Route 20 (West Granby Road), and Barndoor Hill Road. Construction is anticipated to begin in the Spring of 2027. Other Alternatives Considered, But Not Recommended: 1. Leave bridge as is:
Page 15
Federal Local Bridge Program: Bridge No. 04525 Town of Granby IWWC Permit February 2026 3 - Existing superstructure is nearing end of its service life (70 years) - The structure is in fair condition however continued deterioration will result in a poor rating. - Continued deterioration could result in downgrading of condition rating and closure of the bridge. - Continued deterioration could result in load rating capacity not meeting current standards resulting in posted weight restrictions. - Substandard bridge and approach rail system not meeting current safety standards. - The deck geometry rating of 3 indicates that the structure is not wide enough to accommodate the recorded ADT. 2. Rehabilitation of the Superstructure: - The existing abutments are in fair condition, however the existing wingwalls have inadequate structural capacity to support the superstructure replacement. Rehabilitation was not feasible without excavating, removing, and replacing the entire backfill, with a lightweight fill, behind the abutments and up to the bottom of footing. - Maintaining the existing substructure has minimal temporary and no permanent wetland and watercourse impacts. - Lower costs than a full replacement, however, the rehabilitation has a higher life cycle cost and a shorter expected lifespan than a full replacement, requiring a full replacement in the future.
Page 16
Federal Local Bridge Program: Bridge No. 04525 Town of Granby IWWC Permit February 2026 1 Photographs
Page 17
Federal Local Bridge Program: Bridge No. 04525 Town of Granby IWWC Permit February 2026 2 Simsbury Road over West Branch of Salmon River – Structure No. 04525 N
Page 18
Federal Local Bridge Program: Bridge No. 04525 Town of Granby IWWC Permit February 2026 3 Bridge No. 04525 looking North Bridge No. 04525 looking South
Page 19
Federal Local Bridge Program: Bridge No. 04525 Town of Granby IWWC Permit February 2026 4 Upstream Channel Downstream Channel
Page 20
Federal Local Bridge Program: Bridge No. 04525 Town of Granby IWWC Permit February 2026 5 East Elevation (Outlet) West Elevation (Inlet)
Page 21
Federal Local Bridge Program: Bridge No. 04525 Town of Granby IWWC Permit February 2026 6 Pier (North Face) Northerly Span (Note: No Flow)
Page 22
Federal Local Bridge Program: Bridge No. 04525 Town of Granby IWWC Permit February 2026 7 Typical bearing at Abutment No. 1 Bearing No. 2 at pier with rust and laminar rust
Page 23
Federal Local Bridge Program: Bridge No. 04525 Town of Granby IWWC Permit February 2026 8 Spall in Pedestal No. 1 at Abutment No. 1 Exposed prestressing strands with rust noted at ends of beams (typical at pier)
Page 24
Federal Local Bridge Program: Bridge No. 04525 Town of Granby IWWC Permit February 2026 List Of Abutters • Granby Land Trust (155 Simsbury Road) P.O. Box 23 Granby, CT 06035 • Granby Land Trust (40 Holcomb Ridge Road) P.O. Box 23 Granby, CT 06035 • Salmon Brook Historical Society, Inc. (143 Simsbury Road) P.O. Box 840 Granby, CT 06035 • Katherine C. Dunnington 142 Simsbury Road West Granby, CT 06090
Page 25
Federal Local Bridge Program: Bridge No. 04525 Town of Granby IWWC Permit February 2026 Property Owner Correspondence
Page 26
Federal Local Bridge Program: Bridge No. 04525 Town of Granby IWWC Permit February 2026 Submitted Under Separate Cover
Page 27
Federal Local Bridge Program: Bridge No. 04525 Town of Granby IWWC Permit February 2026 Site Maps
Page 28
0 2,000 4,000 6,0001,000 Feet 1 INCH = 2,000 FEET Ü ▄▄OP F 300 6 500 500 750 350 400 650 350750 700 450 450 350 750 650 400 650 300 500 600 350 500 250 650 550 300 300 400 450 500 350 600 450 450 750 400 250 450 250 600 500 550 250 300 30 400 550 450 450 500 300 400 350 200 350 550 450 650 500 400 550 3005 350 450 200 850 500 550 300 550 250 450 700 ¬«20 ¬«20 FOX RD BARNDOOR HILLS RD HALE VIEW DR OLD FIELD RD REED HILL RD F M CLARK CIR SIMSBURY RD HOLCOMB HILL DR THRONEBROOK RD GRANBY FARMS RD BUSHY HILL RD STRAWBERRY FIELDS RD STRONG RD W EED HILL RD N MUNNISUNK DR BROAD HILL RD SIMSBURY RD FIRETOWN RD SIMSBURY RD DAY ST S W GRANBY RD Kendall Brook W Br Salmon Brook W Br Salm on Brook Bissell Brook Bissell Brook W Br Salmon Br Kendell Brook Kettle Pond Spring Pond West Granby Huggins Gorge Broad Hill Stony Hill Weed Hill Barndoor Hills Metacomet Ridge The Knolls USGS QUADRANGLE MAP BRIDGE NO. 04525 IN GRANBY, CT SIMSBURY ROAD OVER WEST BRANCH SALMON BROOK USGS QUAD MAP #21 BRIDGE NO. 04525
Page 29
Page 30
Federal Local Bridge Program: Bridge No. 04525 Town of Granby IWWC Permit February 2026 Soil Scientist Report
Page 31
www.ecomapsllc.com | 42 Bar Gate Trail, Killingworth CT 06419 | (248) 885-5477 | michelle@ecomapsllc.com May 3, 2025 CHA Consulting, Inc. Attn: Stephany Dubina (SDubina@chasolutions.com) John Wengell (JWengell@chasolutions.com) RE: Wetland Delineation Report, CT DOT State Project No. 0055-0145 Rehabilitation of Bridge No. 04525 carrying Simsbury Road over the South Branch of Salmon Brook Granby, CT Ms. Dubina and Mr. Wengell, At the request of CHA, I conducted an inspection of the area demarcated on the mapping provided in the Request for Proposals for the above-referenced project. A sketch map of flagged locations is included in Attachment A: Wetland Sketch Map. The purpose of the inspection was to delineate federal and State of Connecticut jurisdictional wetlands and watercourses and was conducted by myself, a soil scientist as defined in the Connecticut General Statutes, Title 22a, Chapter 440, Inland Wetlands and Watercourses Act, Section 22a-38, on April 21, 2025. Regulated Wetlands and Watercourses In Connecticut wetlands are defined as “land, including submerged land, not regulated pursuant to sections 22a-28 to 22a-35, inclusive, which consists of any of the soil types designated as poorly drained, very poorly drained, alluvial, and floodplain by the National Cooperative Soils Survey, as may be amended from time to time, of the Natural Resources Conservation Service of the United States Department of Agriculture.” Watercourses are defined as being “rivers, streams, brooks, waterways, lakes, ponds, marshes, swamps, bogs and all other bodies of water, natural or artificial, vernal or intermittent, public or private, which are contained within, flow through or border upon this state or any portion thereof, not regulated pursuant to sections 22a -28 to 22a -35, inclusive. Intermittent watercourses shall be delineated by a defined permanent channel and bank and the occurrence of two or more of the following characteristics: (A) Evidence of scour or deposits of recent alluvium or detritus, (B) the presence of standing or flowing water for a duration longer than a particular storm incident, and (C) the presence of hydrophytic vegetation.” Federal Wetlands are defined as “Those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions.” Federal wetlands are delineated based on three-parameters looking at soils, vegetation and hydrology.
Page 32
Wetland Delineation Report CT DOT 0055-0145 2 State and federal wetland resource areas were delineated by examining the upper 24 ” of the soil profile and those areas that met the criteria noted above were demarcated in the field with sequentially numbered pink and black flagging. The limit of the Ordinary High Water (OHW) both up and downstream of the Bridge was staked in the field with blue flagging atop wooden stakes with the elevation of the OHW demarcated in black writing. The location of the OHW stakes is presented in both Attachment A: Wetland Sketch Maps and Attachment F: OHW Data Form. Site Description and Wetlands The delineation focused on areas along Simsbury Road north and south of Bridge 04525 (herein the Bridge) that spans the South Branch of Salmon Brook (herein the Brook ) in the Town of Granby, Connecticut. The Brook flows from north to southeast beneath the Bridge and the delineation area is abutted by agricultural fields to the southwest and northeast and forested areas to the northwest and southeast. The Granby Land Trust Wilcox Family Preserve maintains an active hiking trail along the Brook to the west of the Bridge. Wetland resources were flagged as follows: Wetland W1 (Flags W1-1 through W1-5) This palustrine emergent wetland is located within a man-made topographical depression southeast of the intersection of Holcomb Hill Road and Simsbury Road north of the Bridge. A stone-l ined berm is located at the southern margin that functions as an overflow/outlet into the intermittent watercourse to the east. The wetland is fringed by managed grassland and landscaping to the north, a narrow band of woodland to the south, Simsbury Road to the west and the intermittent watercourse to the east. The wetland appears to be hydrologically supported by a restrictive layer beneath the evaluated soils and by surficial runoff from the adjacent roadways. Vegetation within the wetland was sparse but consisted predominantly of invasive phragmites. The fact that the basin is isolated from other wetlands and exists as a man-m ade feature likely make it regulated only at the State-level. Co nnecticut Floodplain Wetlands CT1 , CT2, CT3 (Flags CT1-1 through CT1 -10, CT 2-1 through CT2 -4 and CT3-1 through CT3-3) Wetlands CT1, CT2, and CT3 are situated along the banks of the Brook, with CT 2 and CT3 located along the western bank and CT 1 located along the eastern bank of the Bridge. These wetlands delineate the extent of active floodplain soils adjacent to the Brook, regulated solely under State jurisdiction. The delineated areas lack the three requisite characteristics —hydric soils, hydrophytic vegetation, and wetland hydrology—necessary for classification as federally regulated wetlands. However, the soils are classified as poorly drained, very poorly drained, alluvial, and/or floodplain by the National Cooperative Soil Survey (NRCS). Hydrological indicators within the Brook and floodplain include observable signs of fluctuating water levels, such as erosion/scour, litter removal, exposed roots, undercut banks, and alluvial deposits located upgradient of the ordinary high-water (OHW) mark. Topographically, the wetlands are generally aligned with a distinct “step” separating the Brook from adjacent upland areas. Wetland CT1 is contiguous beneath the Bridge and extends between the central and eastern Bridge abutments as characterized by a sandy outwash area (See Attachment D: Photos 3 and 4). Due to its location under the Bridge, vegetation in this area is sparse. Immediately north of the Bridge, within the floodplain, is a large stand of Japanese knotweed and an ex panse of exposed stone and cobble.
Page 33
Wetland Delineation Report CT DOT 0055-0145 3 West Branch of Salmon Brook The Brook flows from north to southeast beneath the Bridge and has a substrate co mprised predominantly of cobbles and sand. The Brook is characterized by shallow depths (less than 3 feet) and exhibits a flow regime consisting of riffles and runs, with infrequent pools. The channel width varies between approximately 30 and 50 feet. Near the Bridge, the banks are heavil y reinforced with boulder armoring, while upstream and downstream banks are dominated by herbaceous and woody vegetation. About 150–200 feet upstream of the Bridge, a steep slope next to the Brook is experiencing heavy erosion. The erosion starts at the slope’s top, away from the Brook’s flow, undercutting roots of mature trees near Simsbury Road (see Attachment D: Photos 6 and 7). The Connecticut Department of Energy and Environmental Protection (CT DEEP) classifies the Brook’s stream flow as Class 3, indicating that it has a moderately altered stream flow. Within the delineation area, observed invasive vegetation include s multiflora rose ( Rosa multiflora ), Japanese barberry ( Berberis thunbergii ), mugwort (Artemisia vulgaris ), Asiatic bittersweet ( Celastrus orbiculatus), Morrow’s honeysuckle ( Lonicera morrowii), Japanese knotweed ( Polygonum cuspidatum), narrowleaf bittercress (Cardamine impatiens) and burning bush (Euonymus alata). Wetland Soil Types To aid in the evaluation of wetland soils which may occur in the project area, digitally available soil survey information was obtained from the Natural Resources Conservation Service (Attachment B: Soils Map). Although the NRCS soil data is not representative of exact, on -site conditions, it provides a general representation of soil characteristics and the soil catena present in the region. The NRCS Soil Survey Geographic Database (SSURGO) maps the soils within the project area as Sudbury sandy loam, Hinckley loamy sand, Suncook loamy fine sand, and Occum fine sandy loam, all of which are described below: • Sudbury sandy loam: This series consists of very deep, moderately well and somewhat poorly drained soils located on outwash plains. They are nearly level to strongly sloping soils in slight depressions and on terraces and foot slopes in areas of outwash or glaciofluvial deposits with slopes ranging from 0 to 15 percent. • Hinckley loamy sand: This series consists of very deep, excessively drained soils formed in glaciofluvial materials. They are nearly level through very steep soils on outwash terraces, outwash plains, outwash deltas, kames, kame terraces, and eskers with slopes ranging from 0 to 60 percent. • Suncook loamy, fine sand: This series consists of very deep, excessively drained sandy soils formed in alluvial sediments that are nearly level soils on floodplains, subject to frequent or occasional flooding with slopes ranging from 0 to 3 percent. • Occum fine, sandy loam: This series consists of very deep, well drained loamy soils formed in alluvial sediments. They are nearly level soils on floodplains, subject to common flooding. Slope ranges from 0 to 3 percent. Mapping of inland wetland soils by the Soil Survey Geographic Database made available through CT Department of Energy and Environmental Protection (CT DEEP) was generally consistent in that it depicts wetland soils along the Brook margins.
Page 34
Wetland Delineation Report CT DOT 0055-0145 4 If you have any questions regarding the concerns, please don’t hesitate to contact me by email at michelle@ecomapsllc.com or by phone at 248-885-5477. Re gards, Michelle Ford, PWS, CWB®, CESSWI Registered Professional Soil Scientist EcoMaps, LLC. Attachments: Attachment A: Wetland Sketch Map Attachment B: Soils Map Attachment C: Site Photographs Attachment D: Wetland Functions and Values Evaluation Form Attachment E: OHW Data Form
Page 35
Attachment A Wetland Sketch Map
Page 36
# ## # # # # # # # # # # # # # # ## # # # #!( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( ") ") ") ") ") ") ") ") ") ") ") ") ") !( CT1-1 CT1-2 CT1-3 CT1-4 CT1-5 CT1-6 CT1-7 CT1-8 CT1-9 CT1-10 CT2-1 CT2-2 CT2-3 CT2-4 CT3-1 CT3-2 CT3-3 IWC1-1 IWC1-2 IWC1-3 IWC1-4 IWC1-5 IWC1-6 IWC1-7 W1-1 W1-2 W1-3 W1-4 W1-5 OHW-1 OHW-2 OHW-3 OHW-4 OHW-5 OHW-6 OHW-1A OHW-2A OHW-3A OHW-4A OHW-5A OHW-6A OHW-7A www.ecomapsllc.com / 1. Locations as shown are estimated and for field location of flags only . 2. Wetlands delineated by M. Ford on April 21, 2025. 3. Centerline of narrow intermittent watercourse (IWC 1) series flagged. NotesWetland Sketch Map Legend 1 in. = 140 ft. CT DOT 0055-0145 Simsbury Road Gr anby, CT !( Wetland Flag !( OHW Flag (no elevation) ") OHW Stake # Federal Wetland Boundary # CT-Only Wetland Boundary Active Channel (OHW) Intermittent Watercourse CT Wetland Delineation Limits (approx.) Floodplain wetland continues beneath Bridge. OHW indicators diffuse on rocky , floodplain island between OHW-6A and 7A. Very steep, eroding slope. Simsbury Rd. Holcomb Hill Rd. Centerline of narrow (2-3 ft wide) intermit tent watercourse (IWC1).
Page 37
Attachment B Soils Map
Page 38
Soil Map—State of Connecticut, Western Part (Att. B: Soils Map) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/20/2025 Page 1 of 3 4645410 4645450 4645490 4645530 4645570 4645610 4645650 4645690 4645730 4645410 4645450 4645490 4645530 4645570 4645610 4645650 4645690 4645730 679400 679440 679480 679520 679560 679600 679640 679440 679480 679520 679560 679600 679640 41° 56' 35'' N 72° 50' 9'' W 41° 56' 35'' N 72° 49' 57'' W 41° 56' 24'' N 72° 50' 9'' W 41° 56' 24'' N 72° 49' 57'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 18N WGS84 0 50 100 200 300 Feet 0 20 40 80 120 Meters Map Scale: 1:1,650 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale.
Page 39
MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:12,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below . Soil Survey Area: State of Connecticut, Western Part Survey Area Data: Version 2, Aug 30, 2024 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger . Date(s) aerial images were photographed: Jun 14, 2022—Oct 6, 2022 The orthophoto or other base map on which the soil lines were compiled and digitized probably dif fers from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Soil Map—State of Connecticut, Western Part (Att. B: Soils Map) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/20/2025 Page 2 of 3
Page 40
Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 23A Sudbury sandy loam, 0 to 5 percent slopes 0.0 0.2% 38C Hinckley loamy sand, 3 to 15 percent slopes 1.4 46.2% 38E Hinckley loamy sand, 15 to 45 percent slopes 0.0 1.3% 100 Suncook loamy fine sand 0.3 8.3% 101 Occum fine sandy loam 1.4 44.0% Totals for Area of Interest 3.1 100.0% Soil Map—State of Connecticut, Western Part Att. B: Soils Map Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/20/2025 Page 3 of 3
Page 41
Attachment C: ACOE Wetland Determination Data Forms
Page 42
Project/Site: Applicant/Owner: State: Investigator(s): Lat: Soil Map Unit Name: NWI classification: X Are Vegetation , Soil , or Hydrology Yes X Are Vegetation , Soil , or Hydrology SUMMARY OF FINDINGS – Attach site map showing sampling point locations, transects, important features, etc. X No No X X No X X X X Yes X U.S. Army Corps of Engineers WETLAND DETERMINATION DATA SHEET – Northcentral and Northeast Region See ERDC/EL TR-12-1; the proponent agency is CECW-CO-R OMB Control #: 0710-0024, Exp: 11/30/2024 Requirement Control Symbol EXEMPT: (Authority: AR 335-15, paragraph 5-2a) No evidence of hydrology observed. CT DOT 0055-0145 City/County: Granby/Hartford Sampling Date: 4/21/2025 Landform (hillside, terrace, etc.): Embankment Local relief (concave, convex, none): Convex Slope %: 5 CT DOT/CHA CT Sampling Point: OHW-5up M.Ford Section, Township, Range: NAD83 Occum fine sandy loam Are climatic / hydrologic conditions on the site typical for this time of year? Yes No (If no, explain in Remarks.) Subregion (LRR or MLRA): LRR R, MLRA 145 41.9412 Long: -72.8345 Datum: significantly disturbed? Are “Normal Circumstances” present? No naturally problematic? (If needed, explain any answers in Remarks.) Hydrophytic Vegetation Present? Yes Wetland Hydrology Present? Yes If yes, optional Wetland Site ID: Is the Sampled Area Hydric Soil Present? Yes within a Wetland? Yes No Remarks: (Explain alternative procedures here or in a separate report.) Plot is located upgradient of the southern embankment to the West Branch of the Salmon Brook east of Bridge 04525. The embankment was created using stone fill likely for bank stablization as evidenced by the large boulders along the riverbank. HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two required) Primary Indicators (minimum of one is required; check all that apply) Surface Soil Cracks (B6) Surface Water (A1) Water Marks (B1) Hydrogen Sulfide Odor (C1) Crayfish Burrows (C8) Sediment Deposits (B2) Oxidized Rhizospheres on Living Roots (C3) Saturation Visible on Aerial Imagery (C9) Water-Stained Leaves (B9) Drainage Patterns (B10) High Water Table (A2) Aquatic Fauna (B13) Moss Trim Lines (B16) Saturation (A3) Marl Deposits (B15) Dry-Season Water Table (C2) Iron Deposits (B5) Thin Muck Surface (C7) Shallow Aquitard (D3) Inundation Visible on Aerial Imagery (B7) Other (Explain in Remarks) Microtopographic Relief (D4) Drift Deposits (B3) Presence of Reduced Iron (C4) Stunted or Stressed Plants (D1) Algal Mat or Crust (B4) Recent Iron Reduction in Tilled Soils (C6) Geomorphic Position (D2) Water Table Present? Yes No Depth (inches): Sparsely Vegetated Concave Surface (B8) FAC-Neutral Test (D5) Field Observations: Surface Water Present? Yes No Depth (inches): Remarks: No (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Saturation Present? Yes No Depth (inches): Wetland Hydrology Present? ENG FORM 6116-8, JUL 2018 Northcentral and Northeast – Version 2.0
Page 43
Sampling Point: (Plot size: 1. 2. 3. 4. 5. 6. (A/B) 7. Sapling/Shrub Stratum (Plot size: x 1 = 1. x 2 = 2. x 3 = 3. x 4 = 4. x 5 = 5. Column Totals: (B) 6. 7. Herb Stratum (Plot size: X 1. 2. 4 - Morphological Adaptations1 (Provide supporting 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. (Plot size: 1. 2. 3. 4. X VEGETATION – Use scientific names of plants. OHW-5up Tree Stratum 30 ) Absolute % Cover Dominant Species? Indicator Status Dominance Test worksheet: Acer saccharinum 50 Yes FACW Number of Dominant Species That Are OBL, FACW, or FAC:Platanus occidentalis 10 No FACW 4 (A) Betula nigra 20 Yes FACW Total Number of Dominant Species Across All Strata: 7 (B) Percent of Dominant Species That Are OBL, FACW, or FAC: 57.1% Lindera benzoin 15 Yes FACW Prevalence Index worksheet: 10 Yes UPL FAC species 3 9 0 0 Total % Cover of: 190 Euonymus alatus Rosa multiflora 5 No FACU UPL species 10 50 Berberis thunbergii 10 Yes FACU FACU species 25 80 =Total Cover 349 Prevalence Index = B/A = 2.62 Pinus strobus 5 No FACU 133 (A) 15 ) OBL species Multiply by: FACW species 95 100 45 =Total Cover 1 - Rapid Test for Hydrophytic Vegetation 5 ) 2 - Dominance Test is >50% Hydrophytic Vegetation Indicators: Alliaria petiolata 5 Yes FACU 3 - Prevalence Index is ≤3.01 Solidago rugosa 3 Yes FAC Problematic Hydrophytic Vegetation1 (Explain) 1Indicators of hydric soil and wetland hydrology must be present, unless disturbed or problematic. data in Remarks or on a separate sheet) Sapling/shrub – Woody plants less than 3 in. DBH and greater than or equal to 3.28 ft (1 m) tall. Definitions of Vegetation Strata: Tree – Woody plants 3 in. (7.6 cm) or more in diameter at breast height (DBH), regardless of height. Woody Vine Stratum 30 ) Woody vines – All woody vines greater than 3.28 ft in height. Herb – All herbaceous (non-woody) plants, regardless of size, and woody plants less than 3.28 ft tall.8 =Total Cover Hydrophytic Vegetation Present? Yes No Remarks: (Include photo numbers here or on a separate sheet.) Tree species with deep roots into water table near river elevation contribute to dominant hydric vegetation but shallower rooted shrubs and herbaceous layer does not lean hydric. =Total Cover ENG FORM 6116-8, JUL 2018 Northcentral and Northeast – Version 2.0
Page 44
Sampling Point X SOIL OHW-5up Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features Sandy loam (inches) Color (moist) % Color (moist) % Type1 2-14 10YR 4/6 Loamy/Clayey Sandy loam Loc2 Texture Remarks Loamy/Clayey100 Hydric Soil Indicators: Indicators for Problematic Hydric Soils3: Histosol (A1) Polyvalue Below Surface (S8) (LRR R, 2 cm Muck (A10) (LRR K, L, MLRA 149B) Coast Prairie Redox (A16) (LRR K, L, R) 5 cm Mucky Peat or Peat (S3) (LRR K, L, R) Hydrogen Sulfide (A4) Thin Dark Surface (S9) (LRR R, MLRA 149B) unless disturbed or problematic. Polyvalue Below Surface (S8) (LRR K, L) 1Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. 2Location: PL=Pore Lining, M=Matrix. Thick Dark Surface (A12) Loamy Gleyed Matrix (F2) Piedmont Floodplain Soils (F19) (MLRA 149B) Depleted Matrix (F3) Red Parent Material (F21) (outside MLRA 145) Stratified Layers (A5) High Chroma Sands (S11) (LRR K, L) Thin Dark Surface (S9) (LRR K, L) Depleted Below Dark Surface (A11) Loamy Mucky Mineral (F1) (LRR K, L) Iron-Manganese Masses (F12) (LRR K, L, R) 0-2 10YR 3/2 100 Histic Epipedon (A2) Yes No Remarks: Dense fill at 12-14 inches associated with created berm. No evidence of hydric soils within 14" and unlikely to be encountered within 24" given the topographic position, lack of hydrology and position atop the berm. Restrictive Layer (if observed): Type: Stone/rock fill Depth (inches): 14 Hydric Soil Present? Black Histic (A3) Mesic Spodic (A17) (MLRA 144A, 145, 149B) Stripped Matrix (S6) Dark Surface (S7) MLRA 149B) Redox Depressions (F8) Marl (F10) (LRR K, L) Red Parent Material (F21) (MLRA 145) 3Indicators of hydrophytic vegetation and wetland hydrology must be present, Sandy Gleyed Matrix (S4) Other (Explain in Remarks) Redox Dark Surface (F6) Sandy Mucky Mineral (S1) Depleted Dark Surface (F7) Very Shallow Dark Surface (F22) Sandy Redox (S5) ENG FORM 6116-8, JUL 2018 Northcentral and Northeast – Version 2.0
Page 45
Project/Site: Applicant/Owner: State: Investigator(s): Lat: Soil Map Unit Name: NWI classification: X Are Vegetation , Soil , or Hydrology Yes X Are Vegetation , Soil , or Hydrology SUMMARY OF FINDINGS – Attach site map showing sampling point locations, transects, important features, etc. No X No X X No X X X X Yes X Remarks: No (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Saturation Present? Yes No Depth (inches): Wetland Hydrology Present? Water Table Present? Yes No Depth (inches): Sparsely Vegetated Concave Surface (B8) FAC-Neutral Test (D5) Field Observations: Surface Water Present? Yes No Depth (inches): Iron Deposits (B5) Thin Muck Surface (C7) Shallow Aquitard (D3) Inundation Visible on Aerial Imagery (B7) Other (Explain in Remarks) Microtopographic Relief (D4) Drift Deposits (B3) Presence of Reduced Iron (C4) Stunted or Stressed Plants (D1) Algal Mat or Crust (B4) Recent Iron Reduction in Tilled Soils (C6) Geomorphic Position (D2) Remarks: (Explain alternative procedures here or in a separate report.) Plot is located upgradient of a small, manmade basin just southeast of the intersection of Holcomb Hill Rd. and Simsbury Rd. north of Bridge 04525. HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two required) Primary Indicators (minimum of one is required; check all that apply) Surface Soil Cracks (B6) Surface Water (A1) Water Marks (B1) Hydrogen Sulfide Odor (C1) Crayfish Burrows (C8) Sediment Deposits (B2) Oxidized Rhizospheres on Living Roots (C3) Saturation Visible on Aerial Imagery (C9) Water-Stained Leaves (B9) Drainage Patterns (B10) High Water Table (A2) Aquatic Fauna (B13) Moss Trim Lines (B16) Saturation (A3) Marl Deposits (B15) Dry-Season Water Table (C2) Is the Sampled Area Hydric Soil Present? Yes within a Wetland? Yes No significantly disturbed? Are “Normal Circumstances” present? No naturally problematic? (If needed, explain any answers in Remarks.) Hydrophytic Vegetation Present? Yes Wetland Hydrology Present? Yes If yes, optional Wetland Site ID: Are climatic / hydrologic conditions on the site typical for this time of year? Yes No (If no, explain in Remarks.) Subregion (LRR or MLRA): LRR R, MLRA 145 41.9412 Long: -72.8345 Datum: U.S. Army Corps of Engineers WETLAND DETERMINATION DATA SHEET – Northcentral and Northeast Region See ERDC/EL TR-12-1; the proponent agency is CECW-CO-R OMB Control #: 0710-0024, Exp: 11/30/2024 Requirement Control Symbol EXEMPT: (Authority: AR 335-15, paragraph 5-2a) No evidence of hydrology observed. CT DOT 0055-0145 City/County: Granby/Hartford Sampling Date: 4/21/2025 Landform (hillside, terrace, etc.): Terrace/Field Local relief (concave, convex, none): Convex Slope %: 5 CT DOT/CHA CT Sampling Point: W1-1up M.Ford Section, Township, Range: NAD83 Occum fine sandy loam ENG FORM 6116-8, JUL 2018 Northcentral and Northeast – Version 2.0
Page 46
Sampling Point: (Plot size: 1. 2. 3. 4. 5. 6. (A/B) 7. Sapling/Shrub Stratum (Plot size: x 1 = 1. x 2 = 2. x 3 = 3. x 4 = 4. x 5 = 5. Column Totals: (B) 6. 7. Herb Stratum (Plot size: 1. 2. 4 - Morphological Adaptations1 (Provide supporting 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. (Plot size: 1. 2. 3. 4. X Remarks: (Include photo numbers here or on a separate sheet.) =Total Cover Hydrophytic Vegetation Present? Yes No Herb – All herbaceous (non-woody) plants, regardless of size, and woody plants less than 3.28 ft tall.85 =Total Cover Sapling/shrub – Woody plants less than 3 in. DBH and greater than or equal to 3.28 ft (1 m) tall. Definitions of Vegetation Strata: Tree – Woody plants 3 in. (7.6 cm) or more in diameter at breast height (DBH), regardless of height. Woody Vine Stratum 30 ) Woody vines – All woody vines greater than 3.28 ft in height. Potentilla simplex 5 No FACU FACU Problematic Hydrophytic Vegetation1 (Explain) Alliaria petiolata 10 No FACU 1Indicators of hydric soil and wetland hydrology must be present, unless disturbed or problematic. Eurybia divaricata 30 Yes UPL data in Remarks or on a separate sheet) 35 =Total Cover 1 - Rapid Test for Hydrophytic Vegetation 5 ) 2 - Dominance Test is >50% Hydrophytic Vegetation Indicators: Lolium perenne 20 Yes FACU 3 - Prevalence Index is ≤3.01 Festuca arundinacea 20 Yes 90 =Total Cover 855 Prevalence Index = B/A = 4.07 210 (A) 15 ) OBL species Multiply by: FACW species 0 620 Juniperus horizontalis UPL species 35 175 Buxus sempervirens 5 No UPL FACU species 155 FACU Prevalence Index worksheet: 10 Yes FACU FAC species 20 60 0 0 Total % Cover of: 0 8 (B) Percent of Dominant Species That Are OBL, FACW, or FAC: 12.5% Rosa multiflora 20 Yes 30 Yes FACU 1 (A) Betula alleghaniensis 20 Yes FAC Total Number of Dominant Species Across All Strata: VEGETATION – Use scientific names of plants. W1-1up Tree Stratum 30 ) Absolute % Cover Dominant Species? Indicator Status Dominance Test worksheet: Carya ovata 40 Yes FACU Number of Dominant Species That Are OBL, FACW, or FAC:Pinus strobus ENG FORM 6116-8, JUL 2018 Northcentral and Northeast – Version 2.0
Page 47
Sampling Point X Black Histic (A3) Mesic Spodic (A17) (MLRA 144A, 145, 149B) Stripped Matrix (S6) Dark Surface (S7) MLRA 149B) Redox Depressions (F8) Marl (F10) (LRR K, L) Red Parent Material (F21) (MLRA 145) 3Indicators of hydrophytic vegetation and wetland hydrology must be present, Sandy Gleyed Matrix (S4) Other (Explain in Remarks) Redox Dark Surface (F6) Sandy Mucky Mineral (S1) Depleted Dark Surface (F7) Very Shallow Dark Surface (F22) Sandy Redox (S5) Yes No Remarks: Fill encountered at 14 inches likely assiciated with the roadside embankment. Restrictive Layer (if observed): Type: Stone/rock fill Depth (inches): 14 Hydric Soil Present? Polyvalue Below Surface (S8) (LRR K, L) 1Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. 2Location: PL=Pore Lining, M=Matrix. Thick Dark Surface (A12) Loamy Gleyed Matrix (F2) Piedmont Floodplain Soils (F19) (MLRA 149B) Depleted Matrix (F3) Red Parent Material (F21) (outside MLRA 145) Stratified Layers (A5) High Chroma Sands (S11) (LRR K, L) Thin Dark Surface (S9) (LRR K, L) Depleted Below Dark Surface (A11) Loamy Mucky Mineral (F1) (LRR K, L) Iron-Manganese Masses (F12) (LRR K, L, R) 0-1 10YR 4/2 100 Histic Epipedon (A2) Hydric Soil Indicators: Indicators for Problematic Hydric Soils3: Histosol (A1) Polyvalue Below Surface (S8) (LRR R, 2 cm Muck (A10) (LRR K, L, MLRA 149B) Coast Prairie Redox (A16) (LRR K, L, R) 5 cm Mucky Peat or Peat (S3) (LRR K, L, R) Hydrogen Sulfide (A4) Thin Dark Surface (S9) (LRR R, MLRA 149B) unless disturbed or problematic. 5-14 10YR 4/6 100 100 Sandy Loamy sand Loc2 Texture Remarks Loamy/Clayey Loamy/Clayey Sandy loam SOIL W1-1up Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features Sandy loam (inches) Color (moist) % Color (moist) % Type1 1-5 10YR 4/4 ENG FORM 6116-8, JUL 2018 Northcentral and Northeast – Version 2.0
Page 48
Project/Site: Applicant/Owner: State: Investigator(s): Lat: Soil Map Unit Name: NWI classification: X Are Vegetation , Soil , or Hydrology Yes X Are Vegetation , Soil , or Hydrology SUMMARY OF FINDINGS – Attach site map showing sampling point locations, transects, important features, etc. X No X No X X No X X X X X X X X X Yes X U.S. Army Corps of Engineers WETLAND DETERMINATION DATA SHEET – Northcentral and Northeast Region See ERDC/EL TR-12-1; the proponent agency is CECW-CO-R OMB Control #: 0710-0024, Exp: 11/30/2024 Requirement Control Symbol EXEMPT: (Authority: AR 335-15, paragraph 5-2a) Wetland is a small, man-made depression designed to accommodate drainage from the adjacent roadways. CT DOT 0055-0145 City/County: Granby/Hartford Sampling Date: 4/21/2025 Landform (hillside, terrace, etc.): Roadside embankment Local relief (concave, convex, none): Convex Slope %: 3 CT DOT/CHA CT Sampling Point: W1-1wet M.Ford Section, Township, Range: NAD83 Occum fine sandy loam PEM Are climatic / hydrologic conditions on the site typical for this time of year? Yes No (If no, explain in Remarks.) Subregion (LRR or MLRA): LRR R, MLRA 145 41.9418 Long: -72.8342 Datum: significantly disturbed? Are “Normal Circumstances” present? No naturally problematic? (If needed, explain any answers in Remarks.) Hydrophytic Vegetation Present? Yes Wetland Hydrology Present? Yes If yes, optional Wetland Site ID: Is the Sampled Area Hydric Soil Present? Yes within a Wetland? Yes No Remarks: (Explain alternative procedures here or in a separate report.) Plot is located pgradient of a small, manmade basin just southeast of the intersection of Holcomb Hill Rd. and Simsbury Rd. north of Bridge 04525. HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two required) Primary Indicators (minimum of one is required; check all that apply) Surface Soil Cracks (B6) Surface Water (A1) Water Marks (B1) Hydrogen Sulfide Odor (C1) Crayfish Burrows (C8) Sediment Deposits (B2) Oxidized Rhizospheres on Living Roots (C3) Saturation Visible on Aerial Imagery (C9) Water-Stained Leaves (B9) Drainage Patterns (B10) High Water Table (A2) Aquatic Fauna (B13) Moss Trim Lines (B16) Saturation (A3) Marl Deposits (B15) Dry-Season Water Table (C2) Iron Deposits (B5) Thin Muck Surface (C7) Shallow Aquitard (D3) Inundation Visible on Aerial Imagery (B7) Other (Explain in Remarks) Microtopographic Relief (D4) Drift Deposits (B3) Presence of Reduced Iron (C4) Stunted or Stressed Plants (D1) Algal Mat or Crust (B4) Recent Iron Reduction in Tilled Soils (C6) Geomorphic Position (D2) 1 Water Table Present? Yes No Depth (inches): 1 Sparsely Vegetated Concave Surface (B8) FAC-Neutral Test (D5) Field Observations: Surface Water Present? Yes No Depth (inches): Remarks: No (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Saturation Present? Yes No Depth (inches): 0 Wetland Hydrology Present? ENG FORM 6116-8, JUL 2018 Northcentral and Northeast – Version 2.0
Page 49
Sampling Point: (Plot size: 1. 2. 3. 4. 5. 6. (A/B) 7. Sapling/Shrub Stratum (Plot size: x 1 = 1. x 2 = 2. x 3 = 3. x 4 = 4. x 5 = 5. Column Totals: (B) 6. 7. Herb Stratum (Plot size: X 1. X 2. 4 - Morphological Adaptations1 (Provide supporting 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. (Plot size: 1. 2. 3. 4. X VEGETATION – Use scientific names of plants. W1-1wet Tree Stratum 30 ) Absolute % Cover Dominant Species? Indicator Status Dominance Test worksheet: Number of Dominant Species That Are OBL, FACW, or FAC: 2 (A) Total Number of Dominant Species Across All Strata: 2 (B) Percent of Dominant Species That Are OBL, FACW, or FAC: 100.0% Prevalence Index worksheet: FAC species 0 0 0 0 Total % Cover of: 190 UPL species 0 0 FACU species 0 =Total Cover 190 Prevalence Index = B/A = 2.00 95 (A) 15 ) OBL species Multiply by: FACW species 95 0 =Total Cover 1 - Rapid Test for Hydrophytic Vegetation 5 ) 2 - Dominance Test is >50% Hydrophytic Vegetation Indicators: Phragmites australis 70 Yes FACW 3 - Prevalence Index is ≤3.01 Phalaris arundinacea 20 Yes FACW Problematic Hydrophytic Vegetation1 (Explain) 1Indicators of hydric soil and wetland hydrology must be present, unless disturbed or problematic. Osmundastrum cinnamomeum 5 No FACW data in Remarks or on a separate sheet) Sapling/shrub – Woody plants less than 3 in. DBH and greater than or equal to 3.28 ft (1 m) tall. Definitions of Vegetation Strata: Tree – Woody plants 3 in. (7.6 cm) or more in diameter at breast height (DBH), regardless of height. Woody Vine Stratum 30 ) Woody vines – All woody vines greater than 3.28 ft in height. Herb – All herbaceous (non-woody) plants, regardless of size, and woody plants less than 3.28 ft tall.95 =Total Cover Hydrophytic Vegetation Present? Yes No Remarks: (Include photo numbers here or on a separate sheet.) =Total Cover ENG FORM 6116-8, JUL 2018 Northcentral and Northeast – Version 2.0
Page 50
Sampling Point X X X SOIL W1-1wet Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features M (inches) Color (moist) % Color (moist) % Type1 6-14 10YR 4/2 Loamy/Clayey Loc2 Texture Remarks M Sandy Sandy14-24 10YR 5/2 95 10YR 5/8 5 C 95 10YR 5/8 5 C Hydric Soil Indicators: Indicators for Problematic Hydric Soils3: Histosol (A1) Polyvalue Below Surface (S8) (LRR R, 2 cm Muck (A10) (LRR K, L, MLRA 149B) Coast Prairie Redox (A16) (LRR K, L, R) 5 cm Mucky Peat or Peat (S3) (LRR K, L, R) Hydrogen Sulfide (A4) Thin Dark Surface (S9) (LRR R, MLRA 149B) unless disturbed or problematic. Polyvalue Below Surface (S8) (LRR K, L) 1Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. 2Location: PL=Pore Lining, M=Matrix. Thick Dark Surface (A12) Loamy Gleyed Matrix (F2) Piedmont Floodplain Soils (F19) (MLRA 149B) Depleted Matrix (F3) Red Parent Material (F21) (outside MLRA 145) Stratified Layers (A5) High Chroma Sands (S11) (LRR K, L) Thin Dark Surface (S9) (LRR K, L) Depleted Below Dark Surface (A11) Loamy Mucky Mineral (F1) (LRR K, L) Iron-Manganese Masses (F12) (LRR K, L, R) 0-6 7.5YR 2.5/1 100 Histic Epipedon (A2) Yes No Remarks: Plot located within the margins of naturalized, manmade stormwater basin. Restrictive Layer (if observed): Type: Stone/rock fill Depth (inches): 14 Hydric Soil Present? Black Histic (A3) Mesic Spodic (A17) (MLRA 144A, 145, 149B) Stripped Matrix (S6) Dark Surface (S7) MLRA 149B) Redox Depressions (F8) Marl (F10) (LRR K, L) Red Parent Material (F21) (MLRA 145) 3Indicators of hydrophytic vegetation and wetland hydrology must be present, Sandy Gleyed Matrix (S4) Other (Explain in Remarks) Redox Dark Surface (F6) Sandy Mucky Mineral (S1) Depleted Dark Surface (F7) Very Shallow Dark Surface (F22) Sandy Redox (S5) ENG FORM 6116-8, JUL 2018 Northcentral and Northeast – Version 2.0
Page 51
Attachment D: Site Photographs
Page 52
Att. D: Site Photographs CT DOT 0055-0145 Photo 1. View of Bridge 04525 along Simsbury Road facing north. Photo 2. Heavy stone armoring along the banks of the West Branch of Salmon Brook facing southeast toward Bridge 04525.
Page 53
Photo 3. The northern underside area between abutments of Bridge 04525 where floodplain (alluvial) soils were observed. Photo facing north. Photo 4. View of the northern abutment along the bank of the West Branch of Salmon Brook facing east. Att . D: Site Photographs CT DOT 0055-0145
Page 54
Photo 5. Section of unarmored shoreline along the West Branch of Salmon Brook upstream from Bridge 04525. Photo facing southeast. Photo 6 . Floodplain and steep eroding slope along the West Branch of Salmon Brook u pstream of Bridge 04525. Photo facing north. Att . D: Site Photographs CT DOT 0055-0145
Page 55
Photo 7. Notable undercutting a the top the slope upstream of Bridge 04525. Photo 8. Intermittent watercourse located east of the intersection of Holcomb Hill Rd. and Simsbury Rd. Photo facing north toward flag IWC1-1. Att. D: Site Photographs CT DOT 0055-0145
Page 56
Photo 9. Small wetlands W1 adjacent to the intermittent watercourse IWC1. The wetland is separated from the watercourse by a manmade, stone overflow berm. Photo facing southeast. Photo 10. Intermittent watercourse downstream of a small concrete culvert near flag IWC1-4. Att. D: Site Photographs CT DOT 0055-0145
Page 57
Photo 11. Intermittent watercourse running alongside a dirt path north of Bridge 04525. Photo facing north. Att. D : Site Photographs CT DOT 0055-0145
Page 58
Attachment E: Wetland Functions and Values Evaluation Forms
Page 59
Wetland Function-Value Evaluation Form Wetland I.D. Wetland Impact: Type Area Evaluation based on: Field Function(s)/Value(s) Comments X ES Notes: *Refer to backup list of numbered considerations. Small, manmade stormwater basin Very limited due to small size but present Very limited due to small size but present Mapped NDDB habitat as of Nov. 2024 mapping. 3,5,7,8,9,16 1,2,3,4 3,4,7,9,10 Distance to nearest roadway or other development 1 Y N Y Y N N N N N N N Y Floodflow Alteration Other Endangered Species Habitat Fish and Shellfish Habitat Sediment/Toxicant Retention Nutrient Removal Production Export Sediment/Shoreline Stabilization Wildlife Habitat Recreation Educational/Scientific Value Uniqueness/Heritage Visual Quality/Aesthetics Function/Value Suitability Rationale completed? Y NX N Principal or a "habitat island"? Contiguous undeveloped buffer zone present Wildlife & vegetation diversity/abundance (see attached list) W1 41.9418 (Reference#)*Y/N Office Longitude Prepared by: PEM Yes Groundwater Recharge/Discharge 0 X X Dominant wetland systems present How many tributaries contribute to the wetland? Corps manual wetland delineation DateAdjacent land use Agriculture and roadways Latitude 20ft -72.8342 No No Is the wetland a separate hydraulic system? If not, where does the wetland lie in the drainage basin? TBDTBD M.Ford 4/21/2025 Total area of wetland 0.01ac Human made? Yes Is wetland part of a wildlife corridor? No
Page 60
Wetland Function-Value Evaluation Form Wetland I.D. Wetland Impact: Type Area Evaluation based on: Field Function(s)/Value(s) Comments X ES Notes: *Refer to backup list of numbered considerations. No (Agriculture) Is the wetland a separate hydraulic system? If not, where does the wetland lie in the drainage basin? TBDTBD M.Ford 4/21/2025 Middle Total area of wetland 2+acres Human made? No Is wetland part of a wildlife corridor? Yes X X Dominant wetland systems present How many tributaries contribute to the wetland? Corps manual wetland delineation DateAdjacent land use Agriculture and forested Latitude 0 -72.8343 Function/Value Suitability Rationale completed? Y NX Y Principal or a "habitat island"? Contiguous undeveloped buffer zone present Present due to persistent watercourse Wildlife & vegetation diversity/abundance (see attached list) W.Branch Salmon Brook 41.941 (Reference#)*Y/N Office Longitude Prepared by: R3UB1 No Groundwater Recharge/Discharge 6+ Y Y Y Y Y Y Floodflow Alteration Other Endangered Species Habitat Fish and Shellfish Habitat Sediment/Toxicant Retention Nutrient Removal Production Export Sediment/Shoreline Stabilization Wildlife Habitat Recreation Educational/Scientific Value Uniqueness/Heritage Visual Quality/Aesthetics 1,2,4,7,12,15 2,6,13 7,8,10,12,14,15,16,17 1,2,6,8,9,10 4 1,2,3,4,6,8,9,15 Distance to nearest roadway or other development 1 Y Y Y Y Y Y 1,4,6,10,13 Limited but present mostely due to adjacent floodplain Shallow stream but fish and benthic invertebrates observed. Habitat suitable but limited. Retention limited but present during low-flow conditions Limited due to sparse vegetation in channel Limited but present, mostly along the banks. Riverbank armored with stone in many places near the Bridge. Other areas upstream subject to erosion. Limited but present mainly for aquatic species and foraging opportunities Small parking area available for trail that runs near the river. 2,3,5,6,7,8,17 2,5,6,7,8,10 1,11,13 7,16,19,22,27 Limited but access available. Limited but likely local significance View from bridge and trail aestically pleasing Mapped NDDB habitat (Nov. 2024) 5,7,8,10
Page 61
Attachment F: OHW Data Form
Page 62
December 13, 2021
Appendix A: OHW Data Form
ORDINARY HIGH WATER MARK DELINEATION
DATA FORM (Part 1 – Field Work)
Project #: Date:
Town/Route:
Watercourse/Waterbody (if available):
Investigator(s):
Mapping referenced:
Weather Conditions at Investigation:
Measurable precipitation in the past 72 hours? Yes No
Other preceding events (i.e, hurricane, dam failure upstream, etc.) that would make physical indicators
unreliable? (circle one) Yes No
Observed Water Level: (circle one) High Typical Low
Notes: (Specify locations (generally) where physical indicators were located):(Example: Upstream of bridge had
the presence of litter and debris, shelving, and vegetation matted down. Downstream of the bridge had the
presence of scour, shelving and exposed roots. Within the bridge/culvert water staining was present.)
OHW marked at structure inlet outlet N/A
Photo Documentation Attached
(Depict on photos – any estimated OHW marks, flagging and physical indicators)
Sketch Attached (ensure sketch is sent to central surveys)
(Depict on sketch – any estimated OHW marks, flagging and physical indicators)
CT DOT 0055-0145 4/21/2025
Granby/Simsbury Rd.
West Branch of the Salmon Brook
M. Ford
2023 Aerial Imagery, USGS Topographic mapping
~50F and partly cloudy
Physical indicators of OHW up and downstream of Bridge 04525 include erosion/scour, bank
undercutting, root exposure, water staining, litter removal, and shelving.
Much of the riverbanks immediately up and downstream of the Bridge are armored and definitive
water staining was sparse, however staining was evident on the Bridge abutments. OHW staked
both up and downstream of the Bridge.
X X
X
XPage 63
December 13, 2021 Supporting Feature Identification Table Feature Description Interpretations Insert Check if Present Drift/wrack Debris deposited as streamflow recedes (typically during/following flood events); commonly forms linear features or piles and often collects on the upstream side of inundated vegetation or other flow barriers May indicate the spatial extent of a recent flow event; a concentration of drift features may suggest relatively frequent inundation. Erosion/scour The removal of sediment or rock due to mechanical forces (e.g., water or wind) Typically occurs within the active channel (i.e., below the OHWM) but can also result from extreme flood events or non-fluvial processes. Bank undercutting Erosion of channel banks beneath the ground surface such that a “roof” of sediment, roots, etc., remains Typically occurs within the active channel (i.e., below the OHWM); more commonly in entrenched streams. Root exposure Exposure of previously buried roots due to erosion; common along active channel banks, particularly on the outside of bends (meanders) Suggests the presence of active erosional processes; can also result from infrequent flood events. Point bars Depositional features found on the inside of stream bends (meanders). Suggests relatively frequent inundation; the tops of point bars typically occur below the OHWM. Water staining Staining or discoloring of natural (e.g., bedrock) or man-made (e.g., bridges) objects due to the frequent presence of water. In bedrock or colluvial channels or confined reaches where primary indicators cannot develop, water stains are sometimes the best or only indicator of ordinary flow conditions. However, they may indicate the most frequently experienced flow level (e.g., mean flow) rather than the ordinary extent of high flows, or they may indicate the spatial extent of a recent flood. Litter removal The removal of leaves, needles, and other organic ground cover due to flowing water May indicate the extent of recent flows (depending on the time of year) or may be useful for verifying streamflow in small or hard-to-detect streams. Silt deposits Deposition of fine sediments Generally depositional features rather than erosional ones. Silt deposits found on a floodplain often stand in contrast to the relatively course substrate of the active channel. Shelving The presence multiple “benches” and breaks in slope along the margins of the active channel. Suggests downcutting of the active channel. The lowest bench may represent an emerging floodplain. Headcut/ knickpoint An abrupt vertical drop in the stream bed that typically migrates upstream Sometimes indicates the upper, longitudinal extent of a headwater stream and the OHWM (i.e., the point of stream initiation). Macro- invertebrates Invertebrates (animals lacking vertebral columns) that are visible to the naked eye (e.g., aquatic insect larvae, clams, crayfish, aquatic worms, etc.) Certain aquatic species and aquatic life stages of macroinvertebrates have been found to be strongly tied to streamflow permanence (i.e., ephemeral vs. intermittent vs. perennial) in the Pacific Northwest (Mazzacano and Black 2008, Nadeau 2011, Blackburn and Mazzacano 2012). Note: Some potential supporting features and generalized interpretations of their utility for OHWM delineation purposes. These features do not generally indicate the precise location of the OHWM but may be useful as supplementary information (i.e., in addition to interpretation of primary indicators) for interpreting recent or long-term hydrologic and geomorphic conditions within a given stream system. This list is not exhaustive and other supporting features may occur X X X X X X
Page 64
Att. E: OHW Photographs CT DOT 0055-0145 Photo 1. OHW painted on the southern abutmentbeneath Bridge 04525 facing south. Photo 2. OHW painted on the center abutment beneath Bridge 04525 facing north.
Page 65
Photo 3. OHW Stake placed at the shelf and transition from herbaceous to woody stems at OHW-5A. Photo 4. Exposed roots along eroding bank near OHW-4 stake south of Bridge 04525. Att. E: OHW Photographs CT DOT 0055-0145
Page 66
Photo 5. OHW stake set amidst dense, boulder armoring along the riverbank. Photo 6. View of the floodplain that extends beneath Bridge 04525 facing southeast. Att. E: OHW Photographs CT DOT 0055-0145
Page 67
# ## # # # # # # # # # # # # # # ## # # # #!( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( ") ") ") ") ") ") ") ") ") ") ") ") ") !( CT1-1 CT1-2 CT1-3 CT1-4 CT1-5 CT1-6 CT1-7 CT1-8 CT1-9 CT1-10 CT2-1 CT2-2 CT2-3 CT2-4 CT3-1 CT3-2 CT3-3 IWC1-1 IWC1-2 IWC1-3 IWC1-4 IWC1-5 IWC1-6 IWC1-7 W1-1 W1-2 W1-3 W1-4 W1-5 OHW-1 OHW-2 OHW-3 OHW-4 OHW-5 OHW-6 OHW-1A OHW-2A OHW-3A OHW-4A OHW-5A OHW-6A OHW-7A www.ecomapsllc.com / 1. Locations as shown are estimated and for field location of flags only . 2. Wetlands delineated by M. Ford on April 21, 2025. 3. Centerline of narrow intermittent watercourse (IWC 1) series flagged. NotesWetland Sketch Map Legend 1 in. = 140 ft. CT DOT 0055-0145 Simsbury Road Gr anby, CT !( Wetland Flag !( OHW Flag (no elevation) ") OHW Stake # Federal Wetland Boundary # CT-Only Wetland Boundary Active Channel (OHW) Intermittent Watercourse CT Wetland Delineation Limits (approx.) Floodplain wetland continues beneath Bridge. OHW indicators diffuse on rocky , floodplain island between OHW-6A and 7A. Very steep, eroding slope. Simsbury Rd. Holcomb Hill Rd. Centerline of narrow (2-3 ft wide) intermit tent watercourse (IWC1).
Page 68
Federal Local Bridge Program: Bridge No. 04525 Town of Granby IWWC Permit February 2026 Permit Plans
Page 69
Page 70
Page 71
Page 72
Page 73
Page 74
Page 75
Page 76
Federal Local Bridge Program: Bridge No. 04525 Town of Granby IWWC Permit February 2026 Drainage Report
Page 77
REPLACEMENT OF BRIDGE NO. 04525 SIMSBURY ROAD OVER WEST BRANCH OF SALMON BROOK GRANBY, CONNECTICUT DRAFT DRAINAGE REPORT Prepared For: State of Connecticut Department of Transportation Newington, Connecticut PREPARED BY: EMILY A. RICE , P.E. CHECKED BY: STEVEN D. GEORGE , P.E. DATE: OCTOBER 2025 500 WINDING BROOK DRIVE GLASTONBURY, CT 06033 WSP.COM
Page 78
Replacement of Bridge No. 04525 Simsbury Road Over West Branch Salmon Brook WSP Drainage Report Page i State Project No. 0055-0145 Granby, Connecticut 1 INTRODUCTION ................................................................................................................. 1 1.1 Project Description ............................................................. 1 1.2 Design Criteria Drainage Analysis ...............................2 1.3 Design Criteria.......................................................................2 2 PROJECT INFORMATION ............................................................................................. 3 2.1 Existing Stormwater Drainage System Conditions ...............................................................................3 3 STORMWATER DRAINAGE SYSTEM COMPUTATIONS ................................. 3 3.1 Drainage Analysis and Design Methodology ..........3 3.2 Storm Drainage System Computer Program ......... 4 3.3 Proposed Drainage Improvements ............................ 4 3.3.1 System 1 –Simsbury Road STA 18+16.00, 20.00’ RT +/- to STA 17+89.00, 20.00’ LT +/- .............................................................................................. 4 3.3.2 System 2 – Simsbury Road STA 16+36.00, 15.00’ RT +/- TO STA 15+53.00, 43.00’ RT +/- .............................................................................................. 5 3.3.3 Bridge 04525 Gutterflow ....................................................................................... 5 4 ATTACHED SUPPORTING INFORMATION ........................................................... 6 FIGURES FIGURE 1 – LOCATION PLAN ..................................................... 2 APPENDICES A CTDOT DRAINAGE SUBMISSION CHECKLIST B HIGHWAY PLANS C DRAINAGE AREA PLANS D STORMWATER DRAINAGE HYDROLOGIC INFORMATION E GUTTER FLOW ANALYSIS F OPENROADS HYDRUALIC GRADE LINE ANALYSIS G CTDOT MS4 FORM H SLOPE PROTECTION AND SWALE CALCULATIONS I OUTLET PROTECTION CALCULATIONS
Page 79
Replacement of Bridge No. 04525 Simsbury Road Over West Branch Salmon Brook WSP Drainage Report Page 1 State Project No. 0055-0145 Granby, Connecticut 1 INTRODUCTION WSP USA Inc. (WSP) has been engaged by the Connecticut Department of Transportation (CTDOT) through the Bridge On- Call Task Order Program to provide engineering services for the replacement of Simsbury Road over West Branch of the Salmon Brook (Bridge No. 04525). in the Town of Granby, Connecticut in Hartford County. This report presents the stormwater and drainage analysis for Project No. 0055-0145; it provides design information, design criteria, and calculations documenting conformance of the proposed condition with the latest design standards as required by the CTDOTDM (Connecticut Department of Transportation Drainage Manual). The drainage checklist is included in Appendix A. The most recent Highway Plans sheets have been included in Appendix B. See the 70% Design Submission Package submitted under separate cover for the profiles, cross sections, and drainage details. 1.1 PROJECT DESCRIPTION The existing Bridge No. 04525 is a two-span structure that carries Simsbury Road over the West Branch of the Salmon Brook. The bridge is located approximately 0.2 miles north of the intersection of Simsbury Road with Firetown Road and carries one lane of traffic in the northbound and southbound directions northeast of the bridge. The existing bridge was constructed in 1956 and includes two 50’-10” long simple spans. The overall structure length is 111’-0” and the bridge has a 43-degree skew. The West Branch of Salmon Brook flows under the bridge from the west to the east mainly under the southerly Span 1. The project limits start approximately 325 feet south of Bridge No. 04252 and extends approximately 600 feet north of the bridge. The project is located primarily within farmland. Within the project limits, adjacent properties include the Granby Land Trust, Inc on both the southwest and southeast side of the bridge; Salmon Brook Historical Society, Inc northwest of the bridge and; Katherine C. Dunnington northeast of the bridge. Project 0055-0145 includes the following work: • Replacement of existing Bridge No. 04525 with a new bridge structure including the demolition of the existing bridge including both substructures and superstructure. • Realignment and widening of Simsbury Road to include two 10-ft. travel lanes and two 5-ft shoulders for pedestrians and bicyclists and providing for a 30-ft. curb-to-curb roadway width on the bridge. • Modification of the horizontal alignment of the roadway to meet current standards. A location map of the project site is presented in Figure 1.
Page 80
Replacement of Bridge No. 04525 Simsbury Road Over West Branch Salmon Brook WSP Drainage Report Page 2 State Project No. 0055-0145 Granby, Connecticut Figure 1 – Location Plan 1.2 DESIGN CRITERIA DRAINAGE ANALYSIS The project’s drainage scope includes analysis of the drainage systems within the project limits and bridge gutter flow in the proposed condition with the final roadway and bridge geometry. 1.3 DESIGN CRITERIA The design criteria used in the drainage evaluations was obtained from the Connecticut Department of Transportation Drainage Manual, January, 2000, as revised, unless otherwise noted. The Federal Highway Administration Hydraulics Design Series and Highway Engineering Circulars were used as directed by the Drainage Manual. The CTDOT Drainage Manual Table 11-2 provides Pavement Drainage Design Criteria for the design frequencies and allowable design gutter spread based on Roadway Classification, ADT, and Speed. Roadway drainage was designed and analyzed for a 10-year storm event and checked for the 25-year storm event. Simsbury Road is a rural town road with ADT <3000 vpd. Per Table 11-2 of the Drainage Manual, the allowable spread for this roadway type is the shoulder and half of a travel lane. There is a low-point at STA 10+38.00 +/-. SIMSBURY ROAD HOLCOMB HILL BARNDOOR HILL ROAD RD
Page 81
Replacement of Bridge No. 04525 Simsbury Road Over West Branch Salmon Brook WSP Drainage Report Page 3 State Project No. 0055-0145 Granby, Connecticut 2 PROJECT INFORMATION 2.1 EXISTING STORMWATER DRAINAGE SYSTEM CONDITIONS The existing information, including pipe size, inverts and pipe material was taken from a field survey conducted by CTDOT (Connecticut Department of Transportation). Elevation/contour information for drainage areas outside the surveyed boundaries was obtained from the State of Connecticut, “Connecticut Environmental Conditions Online” 2016 LiDAR-based Contours. Hydrologic Soil Groups were determined utilizing the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Web Soil Survey. The NRCS Soil Survey Report is provided in Appendix D. There are two drainage systems and two points of interest for gutterflow within the roadwork project limits. The drainage systems are labeled on Drainage Area Plans provided in Appendix C. The condition of the existing system outlets were not observed. A field investigation and conditions assessment was not performed on the existing drainage structures and inlet and outlet facilities within the roadwork project limits. At the time of this report, there are no known existing drainage issues with the existing systems or points of interest within the project limits. A field investigation and conditions assessment will be performed as the project design progresses, and this information will be included in a subsequent submission. System 1 is located on Simsbury Road and runs approximately from STA 18+16.00, 13.00 RT +/- to STA 17+89.00, 19.00' LT +/- . System 1 is a Type “L” endwall on the east side of the roadway that is connected by an 18” CMP to a straight endwall structure on the west side of the roadway. The land draining to the existing endwall is rural area and mostly grasses with some residential houses and Simsbury Road. The outlet discharges into a vegetated depression with no riprap outlet protection. System 2 is located on Simsbury Road and Holcomb Hill Road and runs approximately from STA 16+47.00, 5.00' RT+/- to STA 15+85.00, 37.00' RT +/-. System 2 is a three catch basin system with 15” RCP connecting the first two catch basins and an 18” RCP connecting to an existing endwall. The land draining to this system is rural area and mostly grasses with some residential houses and portions of Simsbury Road and Holcomb Hill Road. The outlet discharges to the east into a subsequent system that then ultimately makes its way to the downstream side of West Branch Salmon Brook . Gutterflow along the curbed gutter line of bridge no. 04525 discharges on the south side of the bridge at STA 12+62.00, 6.00' LT +/- and 12+41.00, 14.00' RT +/- respectively. Flow at STA 12+62.00, 6.00 LT+/- discharges to the west and ultimately makes its way to the upstream side of West Branch Salmon Brook. Flow at 12+41.00, 14.00' RT +/- discharges to the east and ultimately makes its way to the downstream side of West Branch Salmon Brook. There is no slope protection in place at the discharge locations. 3 STORMWATER DRAINAGE SYSTEM COMPUTATIONS 3.1 DRAINAGE ANALYSIS AND DESIGN METHODOLOGY The drainage design for State Project No. 0055-0145 has been developed to meet the requirements in the CTDOTDM and was modeled in OpenRoads Designer Subsurface Utility Design and Analysis (SUDA). The existing drainage information and flow patterns were obtained from the project survey annotations and contours.
Page 82
Replacement of Bridge No. 04525 Simsbury Road Over West Branch Salmon Brook WSP Drainage Report Page 4 State Project No. 0055-0145 Granby, Connecticut The runoff coefficients used for the development of the flow were 0.95 for pavement, 0.17 for average sloped pervious areas in Hydrologic Soil Groups A and B. These numbers are consistent with Tables 6-3 and 6-4 of the CTDOT Drainage Manual. For most of the inlets and gutter points of interest on the road it was assumed that the Time of Concentration is the minimum of 5 minutes for pavement drainage areas as specified in the Drainage Manual. For the remaining areas, Time of Concentration paths were delineated and the time was calculated utilizing TR-55 methodologies. The Simsbury Road proposed gutters on the bridge were analyzed to determine the spread and depth during a 10-year frequency event checked for a 25-year frequency event. Alternative types of drainage pipe material were considered. Rainfall intensities were determined using the frequency/intensity/duration curves for the project site from the NOAA Precipitation Frequency Data Server website (https://hdsc.nws.noaa.gov/hdsc/pfds/index.html) for the project site. 3.2 STORM DRAINAGE SYSTEM COMPUTER PROGRAM WSP utilized the Bentley computer program titled “Open Roads Designer CE – 2023”. This program performs pipe system and hydraulic grade line calculations using the HEC-22 methodology. Gutter and low point analysis was completed using HEC-22 methodology as required by the Drainage Manual. Slope protection calculations were completed using the Rational method and the Soil Erosion & Sediment Control Manual, September 2023. Swale and outlet protection analysis was completed using FlowMaster CONNECT Edition Update 3. 3.3 PROPOSED DRAINAGE IMPROVEMENTS The model was analyzed for the 10-year and checked for the 25-year events. The hydraulic grade line analysis tables and profiles are included in Appendix F. Minor drainage improvements are proposed for this project. 3.3.1 SYSTEM 1 –SIMSBURY ROAD STA 18+16.00, 20.00’ RT +/- TO STA 17+89.00, 20.00’ LT +/- System 1 will be fully replaced due to the widening of the roadway. The existing drainage infrastructure for this system will be removed. A new Type “L” endwall will be placed on the east side of the roadway at 18+16.00, 20.00’ RT +/- with an 18” RCP connecting to a straight endwall on the west side of the roadway at STA 17+89.00, 20.00’ LT +/-will be installed. The proposed pipe material is RCP. It has been CTDOT practice to replace existing CMP with RCP under the roadway. Drainage Rights of Way will be acquired for the proposed location of the new Type “L” endwall on the west side of the roadway outside the widened roadway limits at STA 18+16.00, 20.00’ RT +/-. A Type C riprap apron with modified riprap is proposed for outlet protection at the proposed straight endwall outlet at STA 17+89.00, 20.00’ LT +/- since there is an existing defined channel at the existing outlet. The riprap apron and outlet pipe are sized for the 10-year design storm. Outlet protection calculations are provided in Appendix I.
Page 83
Replacement of Bridge No. 04525 Simsbury Road Over West Branch Salmon Brook WSP Drainage Report Page 5 State Project No. 0055-0145 Granby, Connecticut 3.3.2 SYSTEM 2 – SIMSBURY ROAD STA 16+36.00, 15.00’ RT +/- TO STA 15+53.00, 43.00’ RT +/- The existing Type “C” catch basin on the east side of Simsbury Road located at STA 16+47.00, 5.00' RT +/- requires replacement due to the realignment and widening of the roadway at this location. The existing Type “C” catch basin will be removed and replaced with a Type “C” catch basin at the new proposed edge of road, STA 16+36.00, 15.00’ RT +/-, A new vegetated swale is proposed to help direct the flow within the catchment area, reduce DCIA, and enhance storm water quality. A “V” shaped swale will be constructed starting just south of the proposed Type “L” endwall in System 1 and continuing to the proposed Type “C-L” catch basin location. A Type “C-L” catch basin will be added in the grass ditch southeast of the replaced Type “C” catch basin at STA 16+31.00, 21.00' RT +/- to catch the flow in the proposed vegetated swale. The “C-L” catch basin will be placed on the existing pipeline from Simsbury Road to the existing catch basin on the east side of Holcomb Hill Road at STA 16+10.00, 44.00' RT +/-. A new 15” RCP will be placed between the new Type “C” and Type “C-L” catch basins because of their proximity to each other. Replaced and new pipe is RCP to match the existing pipe material in this system. All catch basins in this system have more than 1 foot of freeboard from the hydraulic grade line to the top of grate during the 10-year and 25-year design storms. Type G erosion control matting will be used in the swale for the temporary condition until turf is established. Swale calculations are included in Appendix H. 3.3.3 BRIDGE 04525 GUTTERFLOW The gutterflow spread along the west and east curbed gutter lines of the proposed bridge was analyzed for the 10-year storm and checked for the 25-year storm. The gutterflow along the curbed gutter line of the discharges on the south side of the bridge at the west side of the roadway at STA 12+71.00, 15.00’ LT +/- and on the east side of the roadway at STA 12+14.00, 15.00’ RT +/-. Flow at STA 12+71.00, 15.00’ LT +/- discharges to the west and ultimately makes its way to the upstream side of West Branch Salmon Brook. Flow at STA 12+14.00, 15.00’ RT +/- discharges to the east and ultimately makes its way to the downstream side of West Branch Salmon Brook. The 10-year flow is approximately 0.770 CFS at the southwest and 0.200 CFS at the southeast parapet ends of the bridge, respectively. Gutterflow analysis for the 10-year storm event indicates gutterflow spread of approximately 4.3 feet on the west curbline and 2.8 feet on the east curbline. Allowable gutter spread calculations accounted for the shoulder and half of a travel lane, therefore the gutterflow spread will be contained within the shoulders. Therefore, inlets are not proposed within the bridge structure. The gutterflow calculations are included in Appendix E. To mitigate any potential for erosion where the curbed gutter lines on the bridge discharge, crushed stone for slope protection is proposed along the slope immediately downstream of the west side of the roadway and along the end of the bridge parapets at STA 12+71.00, 15.00’ LT +/- and the slope immediately downstream of the east side of the roadway at STA 12+14.00, 15.00’ RT +/-. Calculations for allowable velocities for various soil textures are included in Appendix H.
Page 84
Replacement of Bridge No. 04525 Simsbury Road Over West Branch Salmon Brook WSP Drainage Report Page 6 State Project No. 0055-0145 Granby, Connecticut 4 ATTACHED SUPPORTING INFORMATION The CTDOT Drainage Submission Checklist is provided in Appendix A. The Highway Plans are provided in Appendix B. The Drainage Area Plans for the stormwater drainage analysis is provided in Appendix C. The Stormwater Drainage Hydrologic Information including the NOAA Atlas 14 Data, NRCS Soil Survey Report, Runoff Coefficient Calculations, and Time of Concentration Calculations are provided in Appendix D. The Gutter Flow Analysis is provided in Appendix E. The OpenRoads Hydraulic Grade Line Analysis is provided in Appendix F. The CTDOT MS4 Form is provided in Appendix G. The Slope Protection and Swale Calculations are provided in Appendix H. The Outlet Protection Calculations are provided in Appendix I.
Page 85
APPENDIX A CTDOT DRAINAGE SUBMISSION CHECKLIST
Page 86
Design Development 3.B-5 January 2001 ConnDOT Drainage Manual Project No. Roadway Town Date Designed By Signature of Engineer Drainage Design Checklist (Plans 50% Complete) Allow a 6-8 week review time See Note below. Semi-Final Design Checklist (Plans 60% to 70% Complete) Allow a 5-6 week review time Note: A separate, earlier drainage submission (at approximately 50% completion) may be required if the drainage design is particularly complicated, requires si gnificant right of way and/or otherwise might jeopardize the schedule of the project. This checklist MUST accompany both of these submissions. Indicate which submission this checklist is for and include the following information: Drainage Design Submission Semi-Final Design Submission a. Draft Drainage Report 1. Disposition of Preliminary Design/Drainag e Design Submission co mments with written responses justifying comments not incorporated. Included Not Included Not Applicable 2. A condition survey of the existing drainage pipes and structures that are to remain in use should be investigated for structural adequacy and documented. (See Section 3.6.3.) Included Not Included Not Applicable 3. The condition of existing ditc hes that are to remain in us e should be field inspected, analyzed and results documented to verify their stability and the need for cleaning and reshaping. Included Not Included Not Applicable 4. The condition of the outlet at the existing di scharge points should be investigated and documented to ensure no erosion or sediment problems exist. If outlet protection is required, it should be incorporated into the project and computations submitted. Included Not Included Not Applicable 0055-0145 Simsbury Road Granby 10/15/2025 Emily Rice ** X X X ** Response to comments included with the 70% Design Submission Package. X
Page 87
3.B-6 Design Development ConnDOT Drainage Manual March 2008 5. A condition survey report including items 2, 3, and 4 above. (See Appendix A and B, Chapter 4) Included Not Included Not Applicable 6. Drainage design computations should includ e gutter flow analysis , storm sewer design, and hydraulic gradeline (HGL). The hydraulic gradeline should be analyzed to ensure 0.3m (1 ft) freeboard is maintained at drainage structures. This analysis should consider all friction, entrance, junction, exit and bend losses. Designer to verify that the proposed drainage will not adversely impact the exis ting downstream storm system or property owners. (See Chapter 11, Storm Drainage Systems.) Included Not Included Not Applicable 7. Drainage computations should identify struct ures by station and offset rather than by a numerical identifier. If sta tion and offset is not feasible for the computations then include an index with the location of the structure co rresponding to its numerical identifier. The watershed map should be prepared accordingly. Included Not Included Not Applicable 8. Existing drainage systems shall be analyz ed for hydraulic adequacy to meet the proposed conditions and, if found inadequate, an upgrade will be designed in conformance with the criteria established in the Drainage Manual. Included Not Included Not Applicable 9. All roadway drainage systems should be brought to a suitable outlet. Included Not Included Not Applicable 10. If upgrading of pipes downstream of the proj ect is necessary, then additional rights may need to be acquired. Included Not Included Not Applicable 11. The need for temporary drainage should be addressed. Temporary drainage computations should be prepared in accord ance with criteria in the Drainage Manual. (See Section 3.6.11.) Included Not Included Not Applicable 12. Proposed swales, ditches and channels should be designed in accordance with HEC-15 for discharges 1.42 m 3/s (50 ft 3/s) and less or HEC-11 for discharges in excess of 1.42 m3/s (50 ft3/s). (See Chapter 7, Channels.) Included Not Included Not Applicable 13. Minor and small cross culvert design comput ations with culvert data sheet. (See Chapter 8, Culverts.) Included Not Included Not Applicable 14. Topographic mapping with watershed area delineated for each inlet and/or cross culverts as required to perform the drainage calculatio ns. The flow path us ed in the time of concentration calculation and coefficient of imperviousness should be shown for each area. (See Chapter 6, Hydrology.) Included Not Included Not Applicable 15. Diversion identified. Included Not Included Not Applicable 16. All plans, computations and reports identify the responsible engineers who prepared and checked the work. Included Not Included Not Applicable 17. Alternate types of drainage pipe material have been considered and documented. Included Not Included Not Applicable X X X X X X X X X X X X X
Page 88
Design Development 3.B-7 October 2000 ConnDOT Drainage Manual b. Plans, Profiles and Cross Sections 1. The existing and proposed storm drainage shown to their outlets. Included Not Included Not Applicable 2. Size and type of existing drainage pipes/structures and disposition of pipes/structures to be abandoned. Included Not Included Not Applicable 3. Properties affected by diversions should be shown on the plans so that proper rights can be acquired. Included Not Included Not Applicable 4. Drainage Rights and Easements. Included Not Included Not Applicable 5. Outlet Protection shown on plans and details provided. Included Not Included Not Applicable 6. Intersection grading plans to ensure inlets are located at the low points to alleviate ponding/icing conditions. Top of frame elevation should be shown. Included Not Included Not Applicable 7. In areas where cross culverts are being extend ed, replaced, or where outlet protection is proposed a profile or cross section of the natural ground should be provided to show how the inverts will tie into the existing topography. Included Not Included Not Applicable 8. The top of frame and invert elevations fo r each storm drainage structure shown. Proposed drainage structures shall be identified by station and offset on cross sections. Included Not Included Not Applicable 9. Existing and proposed drainage patterns (flo w arrows) of pipes, ditches, channel and swales. Included Not Included Not Applicable 10. Details for any special drainage structures not found in the Standard Drawings. Included Not Included Not Applicable 11. The direction of flow should be shown by a rrows to 61m (200 ft.) beyond any drainage outlet, or shown to terminate by dissipation or entrance into a watercourse or body of water. Included Not Included Not Applicable c. Structures with drainage areas > 2.59 km2 (1 mi2) 1. Draft hydraulic design report. Included Not Included Not Applicable 2. Draft scour report when the proposed structure spans the waterway. Included Not Included Not Applicable 3. Draft floodway report. Included Not Included Not Applicable 4. Draft SCEL report. Included Not Included Not Applicable 5. Draft scour report if required. Included Not Included Not Applicable X X X X X X X X X X X X X X X X
Page 89
3.B-8 Design Development ConnDOT Drainage Manual October 2000 Provide justification for items Not Included. Justification should correspond to letter and number. _______________________________________________________________________________ _______________________________________________________________________________ _______________________________________________________________________________ _______________________________________________________________________________ _______________________________________________________________________________ _______________________________________________________________________________ a.2, 4 & 5 Existing survey condition investigation of the drainage systems will be performed subsequent to this submission and incorporated for the next submission. C.1. Not included, done by consultant liaison and submitted under separate cover.
Page 90
APPENDIX B HIGHWAY PLANS
Page 91
CROSS SECTIONSXSC-01 TO XSC-04
GRADING AND LANDSCAPING PLANGLP-01
PROFILEPRO-01
HIGHWAY PLANHWY-01
EROSION CONTROL MEASURES AT CATCH BASINS - FIBER ROLL AND SILT SACKMDS-03
CONCRETE WASHOUT AREA AND TYPE C RIPRAP APRONMDS-02
SEDIMENTATION CONTROL SYSTEMSMDS-01
BASELINE LAYOUT PLAN, BASELINE TIES AND BENCH MARKSALN-01
SUPERELEVATION DIAGRAMSED-01
GENERAL NOTES AND LEGENDGEN-01
TYPICAL SECTIONSTYP-01
INDEX OF DRAWINGSINX-01
DRAWING TITLEDRAWING NUMBERDRAWING TITLEDRAWING NUMBER
INDEX OF DRAWINGS
03 - HIGHWAY
GLASTONBURY, CT 06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
DRAWING TITLE:
INX-01
TOWN(S):
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD
PLOTTED DATE:
c:\bms\2\lbususer\d0161588\HW_CP_0055-0145_INX-01.dgn FILE NAME: USJH683007 LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
0055-0145
DESIGNER/DRAFTER: JLD CHECKED BY: JAH
INDEX OF DRAWINGS
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
03.01Page 92
2:1 MAX
GROUND
APPROX EXISTING
A
B
2% 2%
LANE
10'
SHLDR
5'*
LANE
10'
SHLDR
5'*
(SEE NOTE 3)
2:1 MAX
F
G
B SIMSBURY ROADL
SIMSBURY ROAD - NORMAL CROWN SECTION
** SLOPE VARIES FROM 2% TO 4% - SEE CROSS SECTIONS
*SHOULDER WIDTHS VARIES EXISTING TO 5' FROM STA 9+75 TO 11+00
STA 9+75 TO STA 12+48
12:1
LANE
10'
SHLDR
5'
B SIMSBURY ROADL
LANE
10'
SHLDR
5'
12:1
e%**
e%**
GROUND
APPROX EXISTING
MAX
2:1 12:1 MAX 2:1
SIMSBURY ROAD - BANKED LEFT
** SLOPE VARIES (SEE NOTE 2)
STA 12+48 TO STA 16+05
GROUND
APPROX EXISTING
EXIST
MATCH
EXIST
MATCH
LANE
VARIES
B SIMSBURY ROADL
LANE
VARIES
SIMSBURY ROAD - MILL AND OVERLAY
STA 19+00 TO STA 19+50
STA 9+25 TO STA 9+75
LEGEND:
B
A
C
D
COST OF GRANULAR FILL AND GRAVEL FILL INCLUDED IN GRAVEL DRIVEWAY ITEM. SEE SPECIAL PROVISION.5.
SEE DRAWING NO. GLP-01 FOR SEEDING TYPE.4.
SEE CROSS SECTIONS FOR SIDE SLOPES.3.
SLOPE VAERIES, SEE SUPERELEVATION DIAGRAM ON DRAWING NO. SED-01.2.
FOR LIMITS, SEE DWG. NO. HWY-01.1.
NOTES:
E
F
A
B
2" 4"
PAVEMENT STEP DETAIL
6" GRAVEL ON 4" GANULAR FILL (SEE NOTE 5)
CUT BITUMINOUS CONCRETE PAVEMENT
2" HMA S0.5 TRAFFIC LEVEL 2
FINE MILLING OF BITUMINOUS CONCRETE (0" TO 4")
POINT OF APPLIED GRADE
4" TOPSOIL AND SEEDING (SEE NOTE 4)
METAL BEAM RAIL (R-B MASH) (SEE NOTE 1)
6" PROCESSED AGGREGATE
BITUMINOUS CONCRETE LIP CURBING
12" SUBBASE AND FORMATION OF SUBGRADE
4" HMA S1 TRAFFIC LEVEL 2 (PLACED IN ONE LIFT)
4" HMA S0.5 TRAFFIC LEVEL 2 (PLACED IN TWO EQUAL LIFTS)
G
H
I
SHELF
4'
12:1
SHELF
4'
C
H
G E E
2"
A
LIFT 1
C
LIFT 2
A
G
E
C
B
E
H F
SHELF
4'
SHELF
4'
G
F
4% MAX
7%-e
LANE
10'
B SIMSBURY ROADL
LANE
10'
12:1
e%**
e%**
GROUND
APPROX EXISTING
MAX2:1
SIMSBURY ROAD - BANKED RIGHT
A
G
C
B
SHELF
4'
SHELF
4'
4% MAX
7%-e
12:1(SEE NOTE 3)
VARIES
** SLOPE VARIES (SEE NOTE 2)
FROM STA 17+00 TO 19+00
*SHOULDER WIDTHS VARIES 5' TO EXISTING
STA 16+05 to STA 19+50
I
J
G
J
GLASTONBURY, CT 06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
DRAWING TITLE:
TYP-01
TOWN(S):
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD
PLOTTED DATE:
c:\bms\2\lbususer\d0161588\HW_CP_0055-0145_TYP-01.dgn FILE NAME: USJH683007 LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
0055-0145
DESIGNER/DRAFTER:DG/JLD CHECKED BY:JAH
TYPICAL SECTIONS
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
0
1" = 8'
HORIZONTAL SCALE
8' 16'
**4% **4%
H
F
H
5'*
SHLDR
5'*
SHLDR
GROUND
APPROX EXISTING
EXIST
MATCH
EXIST
MATCH
LANE
VARIES
B HOLCOMB HILL ROADL
LANE
VARIES
HOLCOMB HILL ROAD
STA 50+30 TO STA 50+44
H
1
1.5
J
I
K K
K
MILL AND OVERLAY CONSTRUCTION LIMIT
ROADWAY PAVEMNT TRANSITION DETAIL
STA 50+30 TO STA 50+44
STA 19+00 TO STA 19+50
STA 9+25 TO STA 9+75
A
C
B
FULL DEPTH PAVEMENT
RECONSTRUCTION
MILL AND OVERLAY
(SEE PLANS FOR LIMIT)
EXIST. PAVEMENT
TO REMAIN
N.T.S.
D D
GROUND
APPROX EXISTING
EXIST
MATCH
EXIST
MATCH
LANE
VARIES
B HOLCOMB HILL ROADL
LANE
VARIES
HOLCOMB HILL ROAD - MILL AND OVERLAY
STA 50+30 TO STA 50+44
I
J
H
D D
A
C
B
SLOPE PROTECTION
6" CRUSHED STONE FOR
6" GRANULAR FILL
VARIES
2 MAX,
1
SLOPE PROTECTION DETAIL
N.T.S.
L
L
GRAVEL DRIVEWAY
SEE PLANS
VARIES
03.02Page 93
ENGINEER AND THE TOWN MUST BE NOTIFIED WHEN THIS IS DONE.)
THE CONTRACTOR SHALL RESET ANY DISTURBED MONUMENTS IDENTIFIED ON THE PLANS TO THE PROPER ELEVATION AND LOCATION AT HIS OWN EXPENSE. (THE 7.
WATER FOR DUST CONTROL SHALL BE USED, OTHER MEANS WILL REQUIRE TOWN APPROVAL PRIOR TO USE.6.
FROM POSSIBLE LEAKS. CONTRACTOR SHALL HAVE A SPILL KIT ON SITE AT ALL TIMES.
CHEMICALS NEEDED AT THE SITE SHALL BE STORED IN A SECONDARY CONTAINER AT LEAST 50' FROM WETLANDS OR WATERCOURSES TO PREVENT CONTAMINATION
ANY MAINTENANCE OR REFUELING OF EQUIPMENT AND VEHICLES SHALL BE PERFORMED AT LEAST 50' FROM WETLANDS OR WATERCOURSES. OIL, GASOLINE, AND 5.
OF SUCH WORK.
THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH THE APPROPRIATE UTILITY COMPANIES REGARDING RESETTING OF THEIR FACILITIES AND SCHEDULING 4.
SOIL AND EROSION AND SEDIMENT CONTROL" AND IN ALL CASES, BEST MANAGEMENT PRACTICES SHALL PREVAIL.
COVER STABILIZATION IS ESTABLISHED. ALL SEDIMENT AND EROSION CONTROL MEASURES SHALL CONFORM TO THE MARCH 30, 2024 CONNECTICUT GUIDELINES FOR
SEDIMENT AND EROSION CONTROL MEASURES AS DEPICTED ON THE PLANS SHALL BE IMPLEMENTED PRIOR TO CONSTRUCTION AND MAINTAINED UNTIL PERMANENT 3.
THE ATTENTION OF THE ENGINEER IMMEDIATELY FOR DETERMINATION.
ALL DIMENSIONS AND ELEVATIONS SHOULD BE VERIFIED IN THE FIELD BY THE CONTRACTOR PRIOR TO CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO 2.
4455.
APPROXIMATE. THE LOCATION OF ALL EXISTING UTILITIES SHOULD BE CONFIRMED PRIOR TO BEGINNING CONSTRUCTION. CALL "CALL BEFORE YOU DIG: 1-800-922-
THE LOCATIONS OF EXISTING UTILITIES HAS BEEN BASED UPON AVAILABLE INFORMATION AND MAY BE INCOMPLETE AND WHERE SHOWN, SHOULD BE CONSIDERED 1.
GENERAL NOTES
THE TOWN SHALL MAINTAIN ALL PAVEMENT MARKINGS.3.
CONSTRUCTION OR AS DIRECTED BY THE ENGINEER.
PAVEMENT MARKINGS SHALL BE INSTALLED THROUGHOUT THE PROJECT LIMITS OF CONSTRUCTION. MATCH EXISTING PAVEMENT MARKINGS AT THE LIMITS OF 2.
MARKINGS FOR NON FREEWAYS".
PAVEMENT MARKINGS SHALL BE INSTALLED IN ACCORDANCE STANDARD SHEET NO. TR-1210_04 "PAVEMENT MARKING LINES AND SYMBOLS" AND TR-1210_08 "PAVEMENT 2.
STOP BAR: ITEM - 12010106 - 12" WHITE EPOXY RESIN PAVEMENT MARKINGS
4" DOUBLE YELLOW CENTER LINE: ITEM 1210102 - 4" YELLOW EPOXY RESIN PAVEMENT MARKINGS
4" WHITE EDGE LINE: ITEM 1210101 -4" WHITE EPOXY RESIN PAVEMENT MARKINGS
FINAL PAVEMENT MARKINGS SHALL BE EPOXY RESIN. PAID FOR UNDER THE FOLLOWING ITEMS.1.
PAVEMENT MARKING NOTES
EXISTING CATCH BASIN" AND CLEAN EXISTING CULVERT - 12" TO 42" DIAMETER.
"NOT IN CONTRACT" SHALL BE CLEANED UNLESS OTHERWISE NOTED. THIS WORK TO BE PAID FOR UNDER THE RESPECTIVE CONTRACT ITEMS "CLEAN
ALL EXISTING DRAINAGE STRUCTURES AND PIPES/CULVERTS WITHIN THE PROJECT LIMITS THAT ARE PROPOSED TO REMAIN ARE ARE LABELED NOT 3.
586_01.
DEPRESSION. THE CONTRACTOR SHALL DEPRESS THE CATCH BASIN AS SHOWN ON THE APPLICABLE DETAIL ON HIGHWAY STANDARD SHEET NO. HW-
THE TOP OF FRAME ELEVATIONS SHOWN FOR STRUCTURES AT GUTTER LINE REPRESENTS THE GUTTERLINE ELEVATION WITHOUT ANY REQUIRED 2.
DRAWING NO. MDS-03 FOR DETAILS.
SEDIMENT CONTROL SYSTEM AT CATCH BASINS TO BE INSTALLED IN EXISTING AND PROPOSED CATCH BASINS WITHIN THE PROJECT LIMITS. SEE 1.
DRAINAGE NOTES
WHERE NEW ONES ARE INSTALLED. PAID UNDER ITEM NO. 0930003.
STANDARD SHEET HW-930_01 "OBJECT MARKER (MAINTENANCE)". EXISTING OBJECT MARKER TO BE REMOVED IN AREAS
THE CONTRACTOR SHALL INSTALL OBJECT MARKER (MAINTENANCE) WITHIN THE PROJECT LIMITS IN ACCORDANCE WITH3.
INCLUDED UNDER SING FACE-SHEET ALUMINUM (TYPE XI RETROREFLECTIVE SHEETING).
INSTALL RED RETROREFLECTIVE STRIP (SIGN NO. 31-5004) ON RELOCATED POST. COST
RELOCATED SIGN TO BE PAID FOR UNDER REMOVAL AND RELOCATION OF EXISTING SIGNS2.
AND RETROREFLECTIVE STRIP DETAILS" AND SHEET NO. TR-1208_02 "METAL SIGN POSTS AND SIGN MOUNTING DETAILS".
RELOCATED STOP SIGN SHALL BE INSTALLED ON A NEW POST IN ACCORDANCE WITH CTDOT STANDARD SHEET NO. TR-1208_01 "SIGN PLACEMENT 1.
SIGNING NOTES
LIMIT OF MILL AND OVERLAY
CRUSHED STONE FOR SLOPE PROTECTION
PROCESSED AGGREGATE
GRAVEL DRIVEWAY
TURF ESTABLISHMENT - LAWN
4" TOPSOIL AND CONSERVATION SEEDING FOR SLOPES
CONTROL MATTING TYPE G AT DITCHES.
4" TOPSOIL AND CONSERVATION SEEDING WITH EROSION
CONTROL MATTING TYPE D ON SLOPES 3H:1V AND STEEPER
4" TOPSOIL AND CONSERVATION SEEDING WITH EROSION
APPROXIMATE FILL LINE
APPROXIMATE CUT LINE
TAKING LINE
SINGLE POST-MOUNTED SIGN
SEDIMENTATION CONTROL SYSTEM AT CATCH BASIN
STATED/FEDERAL WETLANDS
ORDINARY HIGH WATER
SEDIMENTATION CONTROL SYSTEM
LEGEND
GLASTONBURY, CT 06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
DRAWING TITLE:
GEN-01
TOWN(S):
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD
PLOTTED DATE:
c:\bms\2\lbususer\d0161588\HW_CP_0055-0145_GEN-01.dgn FILE NAME: USJH683007 LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
0055-0145
DESIGNER/DRAFTER: JLD CHECKED BY: JAH
LEGEND
GENERAL NOTES AND
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
COMPROMISED BY GRADING ACTIVITIES.
VEGETATION AT EDGE OF CLEARING LIMITS TO BE EVALUATED, DEAD OR DYING TREES WITHIN ROW TO BE REMOVED, AS WELL AS ANY WHICH WOULD BECOME 4.
MATTING TYPE D.
EMBANKMENT SLOPES 3H:1V AND STEEPER TO RECEIVE 4" TOPSOIL AND CONSERVATION SEEDING FOR SLOPES INCLUDING EROSION CONTROL 3.
AND MAKE ANY ADJUSTMENTS PRIOR TO CLEARING AND GRUBBING.
THE CONTRACTOR SHALL NOT PERFORM TRIMMING OR CLEARING WITHOUT CONTACTING THE TOWN OF GRANBY A MINIMUM OF TWO WEEKS IN ADVANCE TO REVIEW 2.
PLANS.
ALL AREAS DISTURBED BY CONSTRUCTION SHALL RECEIVE 4" OF TOPSOIL AND CONSERVATION SEEDING FOR SLOPES UNLESS OTHERWISE NOTED OR IDENTIFIED ON THE 1.
LANDSCAPING NOTES
FOR LEGEND OF EXISTING FEATURES, SEE TITLE SHEET
03.03Page 94
0
HORIZONTAL SCALE IN FEET
40 80
0
VERTICAL SCALE IN FEET
0.4 0.8GLASTONBURY, CT 06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
DRAWING TITLE:
SED-01
TOWN(S):
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD
PLOTTED DATE:
c:\bms\2\lbususer\d0161588\HW_CP_0055-0145_SED-01.dgn FILE NAME: USJH683007 LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
0055-0145
DESIGNER/DRAFTER: DG CHECKED BY: JAH
SUPERELEVATION DIAGRAM
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
11+00 12+00 13+00 14+00 15+00 16+00
PT 15+41.82
PC 16+62.52
PC 13+72.15
PT 11+80.80
PC 9+93.09
17+00
-0.6 10' LT
0.54 10' LT
-0.2 10' LT & RT
0.6 10' RT
-0.54 10' RT
12+48
13+31
15+00
14+13
18+00
17+00
-0.4 15' LT & RT
0.55 15' RT
-0.9 15' LT
10+009+00
S=0.48% S=0.57%
13+51
0.10' 15' LT
13+72
-0.6 15' LT
15+35
-0.6' 15' LT
15+52
0.1 15' RT
16+76
-0.6 15' RT
16+58
0.10' 15' LT
19+00
13+64.70
BRIDGE ENDS
12+54.57
BRIDGE BEGINS
9+75
-0.25 12' LT&RT
9+25
-0.44± 12' LT&RT
LT & RT LANE WIDTH
TRANSITION 12' TO 10 '
MATCH EXIST.
TRANS. TO
-0.78 14.6' RT
-0.72 13.25' RT
-0.81 15' RT
-0.61 11.3' RT
-0.59 10.8' RT
0.47 14.3' LT
0.54 13.4' LT
0.58 12' LT 0.27 11.2' LT
0.46 15' LT
0.31± 11.6'± LT
-0.31± 11.6'± RT
TRANSITION 0'TO 5'
LT AND RT SHOULDER
RT AND LT SHOULDER TRANS. 5' TO 0'
10' TO 11.6'±
LT AND RT LANE TRANS.
03.04Page 95
BRIDGE #4525
ABUT #2 ABUT #1 PIER
PARAPET
PARAPET
DBL YELLOW
DBL YELLOW
N
9
0
3
6
0
0
N
9
0
3
6
0
0
N
9
0
4
0
0
0
N
9
0
4
0
0
0
E 976800
E 976800
E 977200
E 977200
Y
E
LLO
W
D
B
L
CP-2
CP-5
CP-6
BOXES
SPLICE
ELEC
B.M. 2
MAG NAIL IN DRILL HOLE IN THE
SOUTHWEST CORNER OF
BRIDGE #04525 PARAPET
Elev. 295.345
NAVD 1988
B.M. 1
BRASS DISK IN TOP OF
CONCRETE MONUMENT
Elev. 311.790
NAVD 1988
(FND)
IP
(FND)
MON
A
P
P
R
O
X
. LO
C
. C
A
B
LE
T
V
D
U
C
T
A
P
P
R
O
X
. LO
C
. 3
" E
LE
C
. D
U
C
T
A
P
P
R
O
X
. LO
C
. TE
L D
U
C
T
(FND)
MON
BARN
FRAME
STORY
1 1/2
CP-2
CP-5
CP-6
B.M. 2
MAG NAIL IN DRILL HOLE IN THE
SOUTHWEST CORNER OF
BRIDGE #04525 PARAPET
Elev. 295.345
NAVD 1988
B.M. 1
BRASS DISK IN TOP OF
CONCRETE MONUMENT
Elev. 311.790
NAVD 1988
N=903067.880
E=976920.331
CP-1 (IP)
N=903602.882
E=977017.837
CP-2 (IP)
N=904433.648
E=977073.425
CP-3 (IP)
N=904961.574
E=977044.262
CP-4 (IP)
SIMSBURY RD
EDGE OF BIT
MAG IN
R
IV
E
R
SIMSBURY RD
POST
WOOD
MAG IN
DH
MAG IN
BARN
RED
SIMSBURY RD
EDGE OF BIT
MAG IN
OF BARN
CORNER
TACK IN
SIMSBURY RD
FLAG POLE
FACE OF
HEADWALL
CORNER OF
DH IN
OF BIT
EDGE
MAG IN
#3216
CL&P
MAG IN
#786
CL&P
MAG IN
9.22'
61.88' 87.12' #784
CL&P
MAG IN
41.96'
6.22'
30.35'
1.47'
37.94'
3
5
.7
2
'
#778
CL&P
MAG IN
2.58'
4.85'49.11'
N=903885.019
E=977083.074
CP-5 (IP)
N=904132.323
E=977026.373
CP-6 (IP)
2
9
.3
2
'
13
.65
'
4
0
.9
3
'
SIMSBURY RD
HILL RD
HOLCOMB
ROCK
DH IN
18" MAPLE
MAG IN
SIMSBURY RD
HILL RD
HOLCOMB
7
.6
2
' 23.92'
4
4
.12
'
15" MAPLE
MAG IN
IN HEADWALL
DH W/MAG
#781
CL&P
MAG IN
#783
CL&P
NAIL IN
SALMON BROOK
SIMSBURY ROAD
H
ILL R
O
A
D
H
O
LC
O
M
B
W
EST BR
AN
C
H
8
3
COORDINATE GRID
A
D
CONNECTICUT
E 977060.614
N 904309.296
STA. 19+50
MATCH EXISTING PAVEMENT MARKINGS
END MILL AND OVERLAY - MEET EXITING PAVEMENT
CUT BITUMINOUS CONCRETE PAVEMENT
END PROJECT NO. 0055-0145
GLASTONBURY, CT 06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
DRAWING TITLE:
ALN-01
TOWN(S):
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD
PLOTTED DATE:
c:\bms\2\lbususer\d0161588\HW_CP_0055-0145_ALN-01.dgn FILE NAME: Deegan LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
0055-0145
DESIGNER/DRAFTER: DG CHECKED BY: JAH
AND BENCH MARKS
BASELINE LAYOUT PLAN, BASELINE TIES
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
0
1" = 40'
HORIZONTAL SCALE
40' 80'
CURVE #3
PC
PI
PT
T
L
R
STA 16+62.52
STA 18+08.23
STA 19+50.85
N 904023.55
E 977049.37
N 904167.86
E 977029.31
N 904310.12
E 977060.80
288.32'
810.00'
145.70'
20° 23'40.2"
PC
PI
T
L
R
STA 10+86.95
STA 11+80.80
N 903455.34
E 977006.08
N 903547.44
E 977024.23
187.72'
6000'
93.87'
01° 47' 33.2"
PI
PT
T
L
R
STA 14+57.78
STA 15+41.82
N 903819.18
E 977077.78
N 903904.00
E 977065.99
169.68'
510.00'
85.63'
19°03'43.8"
CURVE #1 CURVE #2
PT
PC
STA 9+93.09
N 903362.72
E 976990.82
STA 13+72.15
N 903735.17
E 977061.23
CURVE #1
CURVE #2
CURVE #3
E 976979.756
N 903295.541
STA. 9+25.00
MATCH EXISTING PAVEMENT MARKINGS
MEET EXISTING PAVEMENT
BEGIN MILL AND OVERLAY
CUT BITUMINOUS CONCRETE PAVEMENT
BEGIN PROJECT NO. 0055-0145
NO. 04525
BRIDGE PROPOSED
N09°21'19.3"E
81.887ft
N11°08'52.5"E
191.343ft
N07°54'51.3"W
120.703ft 75.000ft N 75°43'36.5"E
P
C
9+
93.09
N
903362.723' E 976990.824' P T 11+ 80.80 N 903547.436' E 977024.231'
P
C
13+
72.15
N
903735.168'
E 977061.225'
PT 15+41.82 N 903903.995' E 977065.991'
PC
16+62.52
N
904023.548' E 977049.371'
END STA50+75.00
N 903972.464'
E 977131.727'
HOLCOMB HILL ROAD STA.
= SIMSBURY ROAD STA 15+92.28
50+00.00
N 903953.973'
E 977059.043'
17+00
16+00
18+00
19+00
15+00
14+00
13+00
12+00
11+00
10+00
BEG
IN
STA
9+
11.20
N
903281.925' E 976977.512'
EN
D
STA
19+
50.85
N
904310.121'
E 977060.796'
E 977101.532
N 903964.782
STA. 50+44
MATCH EXISTING PAVEMENT MARKINGS
MEET EXISTING PAVEMENT
BEGIN MILL AND OVERLAY
CUT BITUMINOUS CONCRETE PAVEMENT
LIMIT OF CONSTRUCTION
03.05Page 96
ELEVATION
FLOW
SECTION A SECTION B
A
ELEVATION
B
*
*
SEDIMENTATION CONTROL SYSTEM
SEDIMENTATION CONTROL SYSTEM
PROPOSED GRADE
EXISTING OR
ON BACKSIDE OF THE BALE
DO NOT DISTURB GROUND
BINDING WIRE OR TWINE
HAY BALE1.5" x 1.5" x 36" MIN.
WOOD STAKE MIN DIMENSIONS
THE HAYBALE
EXCAVATED FILL ALONG
BACKFILL AND COMPACT
DIRECTION OF FLOW
TO A DEPTH OF 4"
ENTRENCH HAY BALES
1.5" x 1.5" x 42"
WOOD STAKE MIN DIMENSIONS
OVERLAP, SECURELY SEALED
AT SUPPORT POSTS WITH MIN. 6"
TO THE WOOD STAKE JOINTS ONLY
FASTEN GEOTEXTILE FABRIC FENCE
EXCAVATE TRENCH 6" MIN. X 6" MIN.
DIRECTION OF FLOW
SUITABLE SOIL
GEOTEXTILE FABRIC FENCE WITH
BACKFILL AND COMPACT OVER THE
WITH SUITABLE SOIL
AND BACKFILL COMPACT
6" MIN. X 6" MIN.
EXCAVATE TRENCH
DIRECTED BY THE ENGINEER
USE A 5' POST SPACING OR AS
FOR SLOPES STEEPER THAN 2:1
12" MIN.
6"
30" MIN.
GRADIENT IS 5% OR MORE
4' FROM THE TOE OF SLOPE AND THE FENCE LINE
INSTALL THE WING WHEN THE FENCE IS MORE THAN
GRADE
EXISTING OR PROPOSED
THE GROUND
DO NOT TOUCH
BINDINGS ON BALES
PLACE HAY BALES SO
PER HAY BALE
TWO WOODEN STAKES
TO A DEPTH OF 4"
ENTRENCH BALES 18" MIN.
FLOW
FILL VOIDS WITH LOOSE HAY
ADD A WING AS DIRECTED
1.5" x 1.5" x 42"
MIN. DIMENSIONS
WOOD STAKE
10' MAX.
GEOTEXTILE FABRIC FENCE
6" BELOW FINISHED GRADE
BURY BOTTOM OF GEOTEXTLE FENCE
GLASTONBURY, CT 06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
DRAWING TITLE:
MDS-01
TOWN(S):
GRANBYOVER WEST BRANCH SALMON BROOK REHABILITATION OF BRIDGE NO. 04525 - SIMSBURY ROAD
PLOTTED DATE:
c:\bms\2\lbususer\d0161588\HW_CP_0055-0145_MDS-01.dgn FILE NAME: USJH683007 LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
0055-0145
DESIGNER/DRAFTER: DG CHECKED BY: JAH
SEDIMENTATION CONTROL SYSTEMS
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
NOT TO SCALE
03.06Page 97
GLASTONBURY, CT 06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
DRAWING TITLE:
MDS-02
TOWN(S):
GRANBYOVER WEST BRANCH SALMON BROOK REHABILITATION OF BRIDGE NO. 04525 - SIMSBURY ROAD
PLOTTED DATE:
c:\bms\2\lbususer\d0161588\HW_CP_0055-0145_MDS-02.dgn FILE NAME: USJH683007 LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
0055-0145
DESIGNER/DRAFTER: DG CHECKED BY: JAH
AND TYPE C RIPRAP APRON
CONCRETE WASHOUT AREA
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
NOT TO SCALE
VARIES
(SEE BELOW)
SIDE SLOPES
NOT TO SCALE
(SEE NOTE 2)
CONCRETE WASHOUT GENERAL NOTES:
SEE NOTE 2
SEE NOTE 2
DEPTH VARIES
EARTH BERM (SEE NOTE 3)
HAY BALES OR COMPACTED
OF THE WORK FOR THE PROJECT, INCLUDING SITE RESTORATION.
7. PAYMENT FOR THIS ITEM IS TO BE INCLUDED UNDER THE GENERAL COST
GUIDELINES.
IN A MANNER CONSISTENT WITH ALL APPLICABLE LAWS, REGULATIONS, AND
APPROVED BY THE ENGINEER. ALL CONCRETE WASTE SHALL BE DISPOSED OF
DEPTH. THE WASTE CAN BE STORED AT AN UPLAND LOCATION, AS
WHEN THE WASTE HAS ACCUMULATED TO HALF OF THE CONCRETE WASHOUT'S
6. HARDENED CONCRETE WASTE SHOULD BE REMOVED AND DISPOSED OF
CHECKED AFTER HEAVY RAINS.
ENVIRONMENTAL INSPECTION REPORT) WASHOUT AREA(S) SHOULD BE
LEAKS, TEARS, OR OVERFLOWS. (AS REQUIRED BY THE CONSTRUCTION SITE
STRUCTURAL INTEGRITY, ADEQUATE HOLDING CAPACITY AND CHECKED FOR
5. WASHOUT AREA(S) ARE TO BE INSPECTED AT LEAST ONCE A WEEK FOR
SAFETY FENCING OR OTHER APPROVED METHOD.
TRUCKS AND PUMP RIGS. WASHOUT AREA(S) SHOULD BE FLAGGED WITH
THE LOCATION OF THE CONCRETE WASHOUT TO OPERATORS OF CONCRETE
CONCRETE AREA(S) AND ELSEWHERE AS NECESSARY TO CLEARLY INDICATE
4. SIGNS SHOULD BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE
AROUND THE PERIMETER OF THE CONCRETE WASHOUT AREA FOR CONTAINMENT.
CONTROL MEASURES, AS APPROVED BY THE ENGINEER, SHOULD BE USED
3. SURFACE DISCHARGE IS UNACCEPTABLE. THEREFORE, HAY BALES OR OTHER
NOT LIMITED TO, OPERATIONS ASSOCIATED WITH GROUT AND MORTAR.
AND CONCRETE WASTE GENERATED BY WASHOUT OPERATIONS INCLUDING, BUT
SIZE: THE WASHOUT MUST HAVE SUFFICIENT VOLUME TO CONTAIN ALL LIQUID
THE WASHOUT IS TO BE LOCATED WITHIN THE FLOODPLAIN.
THE FLOOD CONTINGENCY PLAN MUST ADDRESS THE CONCRETE WASHOUT IF
ANY STREAM, WETLAND, STORM DRAINS, OR OTHER SENSITIVE RESOURCE.
LOCATION: WASHOUT AREA(S) ARE TO BE LOCATED AT LEAST 50 FEET FROM
SEDIMENTATION CONTROL PLAN AND SHALL BE APPROVED BY THE ENGINEER.
THE CONCRETE WASHOUT AREA(S) WITH THE PROJECT'S EROSION AND
2. THE CONTRACTOR SHALL SUBMIT THE DESIGN, LOCATION AND SIZING OF
SELF-CONTAINED.
PLACEMENT ON SITE. THE CONCRETE WASHOUT AREA SHALL BE ENTIRELY
1. CONCRETE WASHOUT AREA(S) SHALL BE INSTALLED PRIOR TO CONCRETE
(SEE NOTE 3)
COMPACTED EARTH BERM
HAY BALES OR
AS DIRECTED BY ENGINEER)
SHEETING (OR METHOD
SAND BAGS TO SECURE
2H:1V OR 3H:1V (NOMINAL)
SIDE SLOPES TO BE
10 MIL POLYETHYLENE SHEETING
EXISTING GROUND
NOT TO SCALE
TYPE C OUTLET APRONS
ENDWALL
12'
0%
CONDITION WARRANT
SURVIVABILITY) SHOULD FIELD
GEOTEXTILE (SEPARATION - MEDIUM
RIPRAP OR 12" FOR STANDARD RIPRAP
6" GRANULAR FILL FOR MODIFIED/ INTERMEDIATE
d
ENDWALL
SECTION A-A
ENDWALL
SECTION B-B
18"
18"
W 3
TWE
MAX.
2H : 1V
Rp MAX. 2H : 1V
1.5' 3' 1.5'
TYPE C RIPRAP APRON
18"
ENDWALL PLAN VIEW
12'
CHANNEL
DEFINED
WELL
3'
ENDWALL
B
B
W3
AA
PLAN
CONCRETE WASHOUT AREA
03.07Page 98
GLASTONBURY, CT 06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
DRAWING TITLE:
MDS-03
TOWN(S):
GRANBYOVER WEST BRANCH SALMON BROOK REHABILITATION OF BRIDGE NO. 04525 - SIMSBURY ROAD
PLOTTED DATE:
c:\bms\2\lbususer\d0161588\HW_CP_0055-0145_MDS-03.dgn FILE NAME: USJH683007 LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
0055-0145
DESIGNER/DRAFTER: DG CHECKED BY: JAH
BASINS - FIBER ROLL AND SILT SACK
EROSION CONTROL MEASURES AT CATCH
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
NOT TO SCALE
CATCH BASIN
PLAN
AT TYPE "C" OR "C-L" CATCH BASIN
INLET SEDIMENT CONTROL DEVICE
SECTION
LIFT STRAPS
DUMPING STRAPS
SILT SACK
CATCH BASIN GRATE
9" FIBER ROLL
TYPE "C" OR "C-L" CATCH BASIN TOP
FIBER ROLL AROUND
CURB DEFLECTOR
SAND BAG
SAND BAG
CONTROL SYSTEM AT CATCH BASIN
NOTE: THIS ITEM WILL BE MEASURED BY EACH SEDIMENT
CONTROL SYSTEM AT CATCH BASIN
NOTE: THIS ITEM WILL BE MEASURED BY EACH SEDIMENT
03.08Page 99
DBL YELLOW
BCLC
FL=315.28
FL=314.02
#780
CL&P
#781
CL&P
18'' CMP
CP-6
APPROX. STREET LINE
APPROX. STREET LINE
ENDWALL
ENDWALL
(FND)
IP
(FND)
MON
E.BIT
E.BIT
143 SIMSBURY RD
SOCIETY, INC
SALMON BROOK HISTORICAL
N/F
#779
CL&P
MAPLE
24"
MAPLE
24"
MAPLE
24"
MAPLE
15"
MAPLE
36"
CATALPA
36"
BARN
FRAME
STORY
1 1/2
D
R
IV
E
G
R
A
V
E
LE.BIT
295
300
305
310
+
+
3
15
315
320
320
325
330
BRIDGE #4525
ABUT #2 ABUT #1 PIER
PARAPET
PARAPET
DBL YELLOW
FL=290.99
FL=290.73
FL=294.70
FL=296.92
FL=306.41
FL=309.86
W
INGW
ALL
WINGWALL
WINGWALL
WINGWALL
#782
CL&P
#783
HELCO
#784
CL&P
N
9
0
4
0
0
0
E 977200
BT=305.98
FL=308.28
TF=311.88
BT=305.03
FL=307.13(S)
FL=307.33(NW)
TF=310.83
BT=305.29
FL=306.89(S)
FL=307.04(N)
TF=310.44
15
'' R
C
P
Y
E
LLO
W
D
B
L
15'' RCP
18'' RCP
CP-2
CP-5BOXES
SPLICE
ELEC
WIRE ROPE
WIRE ROPE WIRE ROPE
WIRE ROPE
B.M. 2
MAG NAIL IN DRILL HOLE IN THE
SOUTHWEST CORNER OF
BRIDGE #04525 PARAPET
Elev. 295.345
NAVD 1988
A
P
P
R
O
X
. S
T
R
E
E
T
LIN
E
A
P
P
R
O
X
. S
T
R
E
E
T
LIN
E
APPROX. STREET LINE
APPROX. STREET LINE
(FND)
MON
ENDWALL
ENDWALL
WIRE ROPE
WOOD POSTS
RCP
24''
24'' RCP
A
PP
R
O
X
. LO
C
. C
A
B
LE
T
V
D
U
C
T
A
P
P
R
O
X
. LO
C
. 3
" E
LE
C
. D
U
C
T
A
PP
R
O
X
. LO
C
. T
E
L D
U
C
T
(FND)
MON
#785
CL&P
155 SIMSBURY RD
GRANBY LAND TRUST, INC.
N/F
285
285
285
285
2
85
285
285
285
285
290
290 290
290 290
290
290
290
290
2
9
0
290
2
9
0
290
290
290
290
295
295
295
295
295
295
295
2
95
300
300
300
30
0
305
305
305
305
305
24'' RCP
3
10
310
310
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
50+00
17+00
18+00
19+00
E 976979.756
N 903295.541
STA. 9+25.00
MATCH EXISTING PAVEMENT MARKINGS
MEET EXISTING PAVEMENT
BEGIN MILL AND OVERLAY
CUT BITUMINOUS CONCRETE PAVEMENT
BEGIN PROJECT NO. 0055-0145
8
3
COORDINATE GRID
A
D
CONNECTICUT
UNIT TYPE II
R-B END ANCHORAGE
R-B END ANCHORAGE UNIT TYPE II
THRIE-BEAM ATTACHMENT
THRIE-BEAM ATTACHMENT
100' METAL BEAM RAIL (R-B MASH)
83' METAL BEAM RAIL (R-B MASH)
R=160'
INV 308.00 15" OUT
TOP EL 311.10
STA 16+36.05, 15.0' RT
0' - 10' DEEP
TYPE "C" CB
PORTION OF EXIST. PIPE
REMOVE EXIST. CB AND
15'
BCLC
BRIDGE NO. 04525PROPOSED
BROOK
REFERENCE ONLY)
(LAYOUT SHOWN IS FOR
RELOCATION (BY OTHERS)
PERMANENT OVERHEAD UTILITY
THRIE-BEAM ATTACHMENT
R-B END ANCHORAGE UNIT TYPE II
R-B END ANCHORAGE UNIT TYPE II
BCLC
AND STOP SIGN (SEE NOTE 6)
RELOCATE STOP BAR
SIMSBURY ROAD
H
O
LC
O
M
B
H
ILL R
O
A
D
BR
AN
C
H
BE RELOCATED (BY OTHERS)
EXISTING UTILITY POLE TO
BE RELOCATED (BY OTHERS)
EXISTING UTILITY POLE TO
INV 315.30 18" OUT
TOP EL 317.80
STA 18+15.50, 20.00' RT
'L' ENDWALL
ROAD B
SIMSBURY
L
REST CATCH BASIN
M
A
TC
H
LIN
E 17+
00
M
A
TC
H
LIN
E 17+
00
STA. 9+75
MATCH EXISTING PAVEMENT WIDTH
BEGIN FULL DEPTH RECONSTRUCTION
CUT BITUMINOUS CONCRETE
END MILL AND OVERLAY
15'
15'
STA. 19+00
BEGIN MILL AND OVERLAY
MATCH EXISTING PAVEMENT WIDTH
CUT BITUMINOUS CONCRETE
END FULL DEPTH RECONSTRUCTION
15'
+00
15'
15'
SWALE
REGRADE EXISTING
BITUMINOUS CONCRETE DRIVEWAY
CENTER LINE
4" DOUBLE YELLOW 4" WHITE EDGE LINE
8
3
COORDINATE GRID
A
D
CONNECTICUT
24.15'±
GRAVEL DRIVEWAY (SEE NOTE 5)
REGRADE PARKING AREA
44'
SIMSBURY ROAD
0
1" = 30'
HORIZONTAL SCALE
30' 60'
R-B END ANCHORAGE UNIT TYPE II
20' ACCESS WIDTH TO FIELD
GRAVEL DRIVEWAY
22.0'
GLASTONBURY, CT 06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
DRAWING TITLE:
HWY-01
TOWN(S):
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD
PLOTTED DATE:
c:\bms\2\lbususer\d0161588\HW_CP_0055-0145_HWY-01.dgn FILE NAME: USJH683007 LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
0055-0145
DESIGNER/DRAFTER: DG CHECKED BY: JAH
HIGHWAY PLAN
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
+00
+27.8
+39.4
24.41'
10'
10'
22.0'±
W
EST
REMOVE EXISTING "L" ENDWALL
GUIDERAIL
REMOVE TWO-CABLE
THRIE-BEAM ATTACHMENT
GUIDERAIL
REMOVE TWO-CABLE
0'-10' DEEP
45 LF - 18" R.C. PIPE
143 SIMSBURY RD
SOCIETY, INC
SALMON BROOK HISTORICAL
N/F
143 SIMSBURY RD
SOCIETY, INC
SALMON BROOK HISTORICAL
N/F
0'-10' DEEP
7 LF 15" RCP
290.00
40 HOLCOMB RIDGE
GRANBY LAND TRUST
N/F
40 HOLCOMB RIDGE
GRANBY LAND TRUST
N/F
B C D
B D
A B C
A
185'±
3
7
'
122'±
+78.5
F
CUT BITUMINOUS CONCRETE PAVEMENT
END MILL AND OVERLAY - MEET EXITING PAVEMENT
MATCH EXISTING PAVEMENT MARKINGS
STA. 19+50
N 904309.296
E 977060.614
END PROJECT NO. 0055-0145
E
SALMON R = 160' 182.14^
R-B END ANCHORAGE UNIT TYPE II
RIGHT TO REMOVE TREES REQUIREDH
HIGHWAY REQUIRED
EASEMENT TO SLOPE FOR SUPPORT OF G
HIGHWAY REQUIRED
EASEMENT TO SLOPE FOR THE SAFETY OF THE F
GUIDERAIL EASEMENTE
SYSTEM REQUIRED
RIGHT TO INSTALL SEDIMENTATION CONTROL D
DRIVEWAY AND/OR PARKING AREA REQUIRED
RIGHT TO CONSTRUCT (OR RECONSTRUCT) C
RIGHT TO GRADE REQUIREDB
PARTIAL ACQUISITION REQUIREDA
SCHEDULE OF RIGHTS AND EASEMENTS
G
H
REMOVE TWO-CABLE GUIDERAIL
GUIDERAIL
REMOVE TWO-CABLE
REFERENCE ONLY)
(LAYOUT SHOWN IS FOR
RELOCATION (BY OTHERS)
PERMANENT OVERHEAD UTILITY
TAKING LINE
TAKING LINE
H
A
(SEE NOTE 9)
SLOPE PROTECTION
CRUSHED STONE FOR
PROTECTION (SEE NOTE 9)
CRUSHED STONE FOR SLOPE SEE NOTE 2
SEE DRAWING NO. MDS-02 FOR RIPRAP APRON DETAIL.9.
FOR CRUSHED STONE FOR SLOPE PROTECTION, SEE DRAWING TYP-01.8.
CATCH BASIN CURB. PAID FOR UNDER BITUMINOUS LIP CURBING.
TRANSITION BITUMINOUS CONCRETE LIP CURB (BCLC) SHAPE AND HEIGHT TO MATCH EXISTING 7.
SEE DRAWING NO. GEN-01 FOR SIGNING AND PAVEMENT MARKING NOTES.6.
REMOVE EXISTING MATERIAL AND INSTALL GRAVEL DRIVEWAY MATERIAL TO EXISTING LIMITS.5.
FIELD REVIEW THE MARKINGS AND MAKE ANY ADJUSTMENTS PRIOR TO CLEARING AND GRUBBING.
CLEARING AND GRUBBING. THE CONTRACTOR SHALL PROVIDE THE TOWN OF GRANBY TWO WEEKS TO
THE CONTRACTOR SHALL MARK ALL TREES, SHRUBS AND PLANTS TO BE REMOVED IN ADVANCE OF 4.
FOR CURVE DATA, SEE DRAWING NO. ALN-013.
FOR STREAM CHANNEL AND EMBANKMENT RESTORATION SEE SUBSET 04-STRUCTURES.2.
FOR NOTES AND LEGEND, SEE DRAWING NO. GEN-011.
NOTES:
SEE NOTE 4
90^
25.5'±
3
2
'
+05.3
90^
GUIDERAIL
REMOVE TWO-CABLE
TAKING LINE
54' *RT16+4716+08.8±
36' *RT15+85±15+58.5
LENGTHSIDETOFROM
BITUMINOUS CONCRETE LIP CURB (BCLC)
R = 160'
O
H
W
O
HW
OHW
12'-6" METAL BEAM RAIL (R-B MASH)
12'-6" METAL BEAM RAIL (R-B MASH)
ACCESS WIDTH TO FIELD
20' GRAVEL DRIVEWAY
12'-6" METAL BEAM RAIL (R-B MASH)
CLEAN EXISTING CATCH BASIN
INV 314.00
TOP EL 317.50
STA 17+88.80, 20.00' LT
STRAIGHT ENDWALL
- 12" TO 42" DIAMETER
CLEAN EXISTING CULVERT
- 12" TO 42" DIAMETER
CLEAN EXISTING CULVERT
CLEAN EXISTING CATCH BASIN
- 12" TO 42" DIAMETER
CLEAN EXISTING CULVERT
SEE NOTE 8
* SEE NOTE 8
0'-10' DEEP
4 LF 15" RCP
INV 307.83 15" OUT
INV 307.90 15" IN
TOP EL 310.20
STA 16+30.79, 21.26' RT
TYPE "CL" CB
0' - 10' DEEP
W/PAVED APRON
TYPE "C-L" CB
ENDWALL
REMOVE EXISTING
SEE NOTE 8
HOLCOMB HILL RD. 44' RT
LIMIT OF OVERLAY
(SEE NOTE 9)
MODIFIED RIPRAP
03.09Page 100
9+00
9+00
10+00
10+00
10+00
10+00
11+00
11+00
12+00
12+00
13+00
13+00
14+00
14+00
15+00
15+00
16+00
16+00
17+00
17+00
18+00
18+00
19+00
19+00
20+00
20+00
270 270
280 280
290 290
300 300
310 310
320 320
330 330
340 340
1499.774'SSD =
198.031'K =
150.000'L =
307.919'SSD =
64.140'K =
320.000'L =
230.359'SSD =
34.415'K =
123.000'L =
312.74'EL.
16+68.00PVT STA.
306.19'EL.
15+18.00PVC STA.
297.84'EL.
13+42.00PVT STA.
323.65'EL.
18+86.50PVT STA.
290.64'EL.
10+22.00PVC STA.
316.55'EL.
17+63.50PVC STA.
290.62'EL.
10+37.69L.P. STA.
-0.24%S=
+4.74% S=
+3.99% S=
+7.56%
S=
290.88'EL.
9+25.00PVI STA.
309.75'EL.
15+93.00PVI STA.
290.25'EL.
11+82.00PVI STA.
319.00'EL.
18+25.00PVI STA.
325.19'EL.
19+06.88PVI STA.
0
HORIZONTAL SCALE IN FEET
40 80
0
VERTICAL SCALE IN FEET
4 8
290.71
290.70
290.73
290.92
292.85
292.68
296.06
295.99
297.46
300.59
305.27
305.34
310.44
309.91
314.02
314.02
318.27
318.20
324.68
324.67
290.56
290.63
291.46
291.61
294.38
294.14
286.66
298.22
301.26
302.97
308.13
307.68
312.22
312.01
315.93
316.01
320.84
321.08
290.84
290.82
STA. 9+25
BEGIN MILL AND OVERLAY
BEGIN STATE PROJECT NO. 0055-0145
STA. 9+75
BEGIN FULL DEPTH RECONSTRUCTION
END MILL AND OVERLAY
STA. 12+54.57
BRIDGE BEGINS
STA. 13+64.70
BRIDGE ENDS
STA. 19+00
BEGIN MILL AND OVERLAY
END FULL DEPTH RECONSTRUCTION
STA. 19+50
END MILL AND OVERLAY
END STATE PROJECT NO. 0055-0145
GLASTONBURY, CT 06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
DRAWING TITLE:
PRO-01
TOWN(S):
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD
PLOTTED DATE:
c:\bms\2\lbususer\d0186709\HW_CB_0055-0145_GEO.dgn FILE NAME: USJH683007 LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
0055-0145
DESIGNER/DRAFTER: DG CHECKED BY: JAH
PROFILE
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
(CALCULATED) EL. 290.5
100-YEAR FLOOD ELEVATION
PROPOSED GRADE
EXISTING GRADE 0'-10' DEEP
18" R.C. PIPE
S=0.24±%
S=8.27±%
0'-10' DEEP
15" R.C. PIPE
0'-10' DEEP
TYPE "C-L"
HOLCOMB HILL ROAD INTERSECTION
0'-10' DEEP
TYPE "C"
0'-10' DEEP
15" R.C. PIPE
EL. 288.37
LOW CHORD
BRIDGE 04525
18" RCP 15" RCP RCP
15"
03.10Page 101
DBL YELLOW
BCLC
FL=315.28
FL=314.02
#780
CL&P
#781
CL&P
18'' CMP
CP-6
APPROX. STREET LINE
APPROX. STREET LINE
ENDWALL
ENDWALL
(FND)
IP
(FND)
MON
DITCH
EARTH
E.BIT
E.BIT
143 SIMSBURY RD
SOCIETY, INC
SALMON BROOK HISTORICAL
N/F
#779
CL&P
MAPLE
24"
MAPLE
24"
MAPLE
24"
MAPLE
15"
MAPLE
36"
CATALPA
36"
BARN
FRAME
STORY
1 1/2
D
R
IV
E
G
R
A
V
E
LE.BIT
295
300
305
310
+
+
3
15
315
320
320
325
330
OHW-1
OHW-2
OHW-3
OHW-4
OHW-5
OHW-6
CT3-1
CT3-2
CT3-3
OHW-6A
OHW-7A
OHW-8A
OHW-5A
OHW-4A
OHW-3A
OHW-2A
OHW-1A
CT1-10
CT1-9
CT1-8
CT1-7
CT1-6
CT1-5
CT1-4
CT1-3
CT1-2
CT1-1
W1-1
W1-2
W1-3
W1-4
W1-5
IWC1-1
IWC1-2
IWC1-3
IWC1-4
IWC1-5
IWC1-6
IWC1-7
BRIDGE #4525
ABUT #2 ABUT #1 PIER
PARAPET
PARAPET
DBL YELLOW
FL=290.99
FL=290.73
FL=294.70
FL=296.92
FL=306.41
FL=309.86
W
INGW
ALL
WINGWALL
WINGWALL
WINGWALL
#782
CL&P
#783
HELCO
#784
CL&P
N
9
0
4
0
0
0
E 977200
BT=305.98
FL=308.28
TF=311.88
BT=305.03
FL=307.13(S)
FL=307.33(NW)
TF=310.83
BT=305.29
FL=306.89(S)
FL=307.04(N)
TF=310.44
15
'' R
C
P
Y
E
LLO
W
D
B
L
15'' RCP
18'' RCP
CP-2
CP-5BOXES
SPLICE
ELEC
WIRE ROPE
WIRE ROPE WIRE ROPE
WIRE ROPE
B.M. 2
MAG NAIL IN DRILL HOLE IN THE
SOUTHWEST CORNER OF
BRIDGE #04525 PARAPET
Elev. 295.345
NAVD 1988
A
P
P
R
O
X
. S
T
R
E
E
T
LIN
E
A
P
P
R
O
X
. S
T
R
E
E
T
LIN
E
APPROX. STREET LINE
APPROX. STREET LINE
(FND)
MON
ENDWALL
ENDWALL
WIRE ROPE
WOOD POSTS
RCP
24''
24'' RCP
A
PP
R
O
X
. LO
C
. C
A
B
LE
T
V
D
U
C
T
A
P
P
R
O
X
. LO
C
. 3
" E
LE
C
. D
U
C
T
A
PP
R
O
X
. LO
C
. T
E
L D
U
C
T
(FND)
MON
#785
CL&P
155 SIMSBURY RD
GRANBY LAND TRUST, INC.
N/F
OHW-1
OHW-2
OHW-3
OHW-4
OHW-5
OHW-6
CT3-1
CT3-2
CT3-3
OHW-6A
OHW-7A
OHW-8A
OHW-5A
OHW-4A
OHW-3A
OHW-2A
CT1-10
CT1-9
CT1-8
CT1-7
CT1-6
CT1-5
CT1-4
CT1-3
CT1-2
CT1-1
W1-1
W1-2
W1-3
W1-4
W1-5
IWC1-1
IWC1-2
IWC1-3
IWC1-4
IWC1-5
IWC1-6
IWC1-7
285
285
285
285
2
85
285
285
285
285
290
290 290
290 290
290
290
290
290
2
9
0
290
2
9
0
290
290
290
290
295
295
295
295
295
295
295
2
95
300
300
300
30
0
305
305
305
305
305
24'' RCP
3
10
310
310
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
50+00
17+00
18+00
19+00
E 976979.756
N 903295.541
STA. 9+25.00
MATCH EXISTING PAVEMENT MARKINGS
MEET EXISTING PAVEMENT
BEGIN MILL AND OVERLAY
CUT BITUMINOUS CONCRETE PAVEMENT
BEGIN PROJECT NO. 0055-0145
8
3
COORDINATE GRID
A
D
CONNECTICUT
SLOPE LIMIT (TYP)
APPROXIMATE
(SEE STRUCTURE PLANS)
BRIDGE NO. 04525
BROOK
SIMSBURY ROAD
H
O
LC
O
M
B
H
ILL R
O
A
D
BR
AN
C
H
M
A
TC
H
LIN
E 17+
00
M
A
TC
H
LIN
E 17+
00
STA. 9+75
MATCH EXISTING PAVEMENT WIDTH
BEGIN FULL DEPTH RECONSTRUCTION
CUT BITUMINOUS CONCRETE
END MILL AND OVERLAY
STA. 19+00
BEGIN MILL AND OVERLAY
MATCH EXISTING PAVEMENT WIDTH
CUT BITUMINOUS CONCRETE
END FULL DEPTH RECONSTRUCTION
15'
+00
15'
8
3
COORDINATE GRID
A
D
CONNECTICUT
24.15'
SIMSBURY ROAD
0
1" = 30'
HORIZONTAL SCALE
30' 60'
22.0'
GLASTONBURY, CT 06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
DRAWING TITLE:
GLP-01
TOWN(S):
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD
PLOTTED DATE:
c:\bms\2\lbususer\d0161588\HW_CP_0055-0145_GLP-01.dgn FILE NAME: Deegan LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
0055-0145
DESIGNER/DRAFTER:DG CHECKED BY:JAH
LANDSCAPING PLAN
GRADING AND
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
324.00
320.00
315.00
310.00
305.00
300.00 295.00
291.00
+39.4
24.41'
10'
22.0'
W
EST
143 SIMSBURY RD
SOCIETY, INC
SALMON BROOK HISTORICAL
N/F
143 SIMSBURY RD
SOCIETY, INC
SALMON BROOK HISTORICAL
N/F
290.00
290.00
40 HOLCOMB RIDGE
GRANBY LAND TRUST
N/F 40 HOLCOMB RIDGE
GRANBY LAND TRUST
N/F
CUT BITUMINOUS CONCRETE PAVEMENT
END MILL AND OVERLAY - MEET EXITING PAVEMENT
MATCH EXISTING PAVEMENT MARKINGS
STA. 19+50
N 904309.296
E 977060.614
END PROJECT NO. 0055-0145
SALMON
TAKING LINE
SLOPE LIMIT (TYP)
APPROXIMATE
SWALE SHALL BE COMPRISED OF 4" TOPSOIL WITH EROSION CONTROL MATTING TYPE G.2.
FOR NOTES AND LEGEND, SEE DRAWING NO. GEN-011.
NOTES:
TAKING LINE
SIMSBURY ROAD BL
SLOPE LIMIT (TYP)
APPROXIMATE
290.00 285.00
300.00
TAKING LINE
(SEE NOTE 2)
VEGETATED DITCH
(SEE NOTE 2)
VEGETATED DITCH
03.11Page 102
STA.9+25.00
-50
-50
-40
-40
-30
-30
-20
-20
-10
-10
0
0
10
10
20
20
30
30
40
40
50
50
270 270
280 280
290 290
300 300
MATCH EXIST.MATCH EXIST.
STA.9+50.00
-50
-50
-40
-40
-30
-30
-20
-20
-10
-10
0
0
10
10
20
20
30
30
40
40
50
50
270 270
280 280
290 290
300 300
12:1-2.0% -2.0% -2.0% -2.0% 12:1
4:1
STA.10+00.00
-50
-50
-40
-40
-30
-30
-20
-20
-10
-10
0
0
10
10
20
20
30
30
40
40
50
50
270 270
280 280
290 290
300 300
EL = 290.70 EL = 290.70
SHDR
SHDR
EOR
EOR
6:1
18:1 -3.0% -2.0% -2.0% -3.0% 12:1
6:1
STA.10+50.00
-50
-50
-40
-40
-30
-30
-20
-20
-10
-10
0
0
10
10
20
20
30
30
40
40
50
50
270 270
280 280
290 290
300 300
EL = 290.63 EL = 290.63
SHDR
SHDR
EOR
EOR
1:20 -4.0% -2.0% -2.0% -4.0% 12:1
STA.11+00.00
-50
-50
-40
-40
-30
-30
-20
-20
-10
-10
0
0
10
10
20
20
30
30
40
40
50
50
270 270
280 280
290 290
300 300
EL = 290.93
SHDR
SHDR
EOR
EOR
20:1 -4.0% -2.0% -2.0% -4.0% 12:1
STA.11+50.00
-50
-50
-40
-40
-30
-30
-20
-20
-10
-10
0
0
10
10
20
20
30
30
40
40
50
50
270 270
280 280
290 290
300 300
EL = 291.61 EL = 291.61
SHDR
SHDR
EOR
EOR
0
1" = 10'
HORIZONTAL SCALE
10' 20'
GLASTONBURY, CT 06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
DRAWING TITLE:
XSC-01
TOWN(S):
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD
PLOTTED DATE:
c:\bms\2\lbususer\d0153873\0055-0145 - Corridor.dgn FILE NAME: USJH683007 LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
0055-0145
DESIGNER/DRAFTER:DG CHECKED BY:JAH
CROSS SECTIONS
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
GRAVEL DRIVEWAY
GRAVEL DRIVEWAY
PARKING AREA
PARKING AREA
03.12Page 103
12:1 -4.0% -2.0% -2.0% -4.0% 12:1 2:1
STA.12+00.00
-50
-50
-40
-40
-30
-30
-20
-20
-10
-10
0
0
10
10
20
20
30
30
40
40
50
50
280 280
290 290
300 300
EL = 292.68 EL = 292.68
SHDR
SHDR
EOR
EOR
2:1
12:1 -4.0% -2.0% -1.9% -4.0%
STA.12+50.00
-50
-50
-40
-40
-30
-30
-20
-20
-10
-10
0
0
10
10
20
20
30
30
40
40
50
50
280 280
290 290
300 300
EL = 294.14 EL = 294.14
SHDR
SHDR
EOR
EOR
-4.0% -2.0% 0.5% -4.0%
STA.13+00.00
-50
-50
-40
-40
-30
-30
-20
-20
-10
-10
0
0
10
10
20
20
30
30
40
40
50
50
280 280
290 290
300 300
310 310
EL = 295.99 EL = 295.99
SHDR
SHDR
EOR
EOR
-4.0% -3.0% 2.9% -4.0%
STA.13+50.00
-50
-50
-40
-40
-30
-30
-20
-20
-10
-10
0
0
10
10
20
20
30
30
40
40
50
50
280 280
290 290
300 300
310 310
EL = 298.22 EL = 298.22
SHDR
SHDR
EOR
EOR
-5.4% -5.4% 5.4% -1.6% 12:1
STA.14+00.00
-50
-50
-40
-40
-30
-30
-20
-20
-10
-10
0
0
10
10
20
20
30
30
40
40
50
50
280 280
290 290
300 300
310 310
EL = 300.59 EL = 300.59
SHDR
SHDR
EOR
EOR
-6.0% -6.0% 6.0% -1.0% 12:1
STA.14+50.00
-50
-50
-40
-40
-30
-30
-20
-20
-10
-10
0
0
10
10
20
20
30
30
40
40
50
50
290 290
300 300
310 310
EL = 302.97 EL = 302.97
SHDR
SHDR
EOR
EOR
-6.0% -6.0% 6.0% -1.0% 12:1
STA.14+25.00
-50
-50
-40
-40
-30
-30
-20
-20
-10
-10
0
0
10
10
20
20
30
30
40
40
50
50
280 280
290 290
300 300
310 310
EL = 301.78 EL = 301.78
SHDR
SHDR
EOR
EOR
0
1" = 10'
HORIZONTAL SCALE
10' 20'
GLASTONBURY, CT 06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
DRAWING TITLE:
XSC-02
TOWN(S):
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD
PLOTTED DATE:
c:\bms\2\lbususer\d0153873\0055-0145 - Corridor.dgn FILE NAME: USJH683007 LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
0055-0145
DESIGNER/DRAFTER:DG CHECKED BY:JAH
CROSS SECTIONS
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
BRIDGE RAIL (TYP.)
3 TUBE CURB MOUNTED
BRIDEGE 04525
BRIDGE RAIL (TYP.)
3 TUBE CURB MOUNTED
BRIDEGE 04525
ATTACHMENT
THRIE BEAM BRIDGE
BRIDGE RAIL
3 TUBE CURB MOUNTED
BRIDGE RAIL
3 TUBE CURB MOUNTED
BRIDGE RAIL
3 TUBE CURB MOUNTED
NW WINGWALL 2A
NW WINGWALL 2A
NW WINGWALL 2A
GRAVEL DRIVEWWAY
SLOPE PROTECTION
CRUSHED STONE FOR
03.13Page 104
12:1
-6.0% -6.0% 6.0% -1.0% 12:1
STA.15+00.00
-50
-50
-40
-40
-30
-30
-20
-20
-10
-10
0
0
10
10
20
20
30
30
40
40
50
50
290 290
300 300
310 310
320 320
EL = 305.34 EL = 305.34
SHDR
SHDR
EOR
EOR
7:1
12:1 -4.0% -3.1% 3.2% -3.5% 12:1 3:1
STA.15+50.00
-50
-50
-40
-40
-30
-30
-20
-20
-10
-10
0
0
10
10
20
20
30
30
40
40
50
50
290 290
300 300
310 310
320 320
EL = 307.68 EL = 307.68
SHDR
SHDR
EOR
EOR
12:1
-4.0% -0.3% 0.3%
STA.16+00.00
-50
-50
-40
-40
-30
-30
-20
-20
-10
-10
0
0
10
10
20
20
30
30
40
40
50
50
290 290
300 300
310 310
320 320
EL = 309.91 EL = 309.91
SHDR
EOR
HOLCOMB HILL ROAD
SECTION ON DRAWING NO. XSC-04
SEE HOLCOMB HILL ROAD CROSS
12:1
-4.0% 2.5% -2.5% -4.0% 6:1 4:1
STA.16+50.00
-50
-50
-40
-40
-30
-30
-20
-20
-10
-10
0
0
10
10
20
20
30
30
40
40
50
50
300 300
310 310
320 320
EL = 312.01 EL = 312.01
SHDR
SHDR
EOR
EOR
INV = 308.00 OUT
TF = 311.10
15.0' RT
STA. 16+36.05
0'-10' DEEP
TYPE "C" CB
0'-10' DEEP
7 LF 15" R.C. PIPE
TYPE "C" CB
REMOVE
OF EXIST. PIPE
REMOVE PORTION
INV = 307.83 OUT
INV = 307.90 IN
TF = 310.20
21.26' RT
STA. 16+30.79
0'-10' DEEP
TYPE "CL" CB
0'-10' DEEP
4 LF 15" R.C. PIPE
6:1
12:1 -1.6% 5.4% -5.4% -5.4% 6:1 6:1
STA.17+00.00
-50
-50
-40
-40
-30
-30
-20
-20
-10
-10
0
0
10
10
20
20
30
30
40
40
50
50
300 300
310 310
320 320
EL = 314.02 EL = 314.02
SHDR
SHDR
EOR
EOR
3:1
12:1 -1.6% 5.4% -5.4% -5.4% 6:1 6:1
STA.17+50.00
-50
-50
-40
-40
-30
-30
-20
-20
-10
-10
0
0
10
10
20
20
30
30
40
40
50
50
300 300
310 310
320 320
330 330
EL = 316.01 EL = 316.01
SHDR
SHDR
EOR
EOR
0
1" = 10'
HORIZONTAL SCALE
10' 20'
GLASTONBURY, CT 06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
DRAWING TITLE:
XSC-03
TOWN(S):
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD
PLOTTED DATE:
c:\bms\2\lbususer\d0153873\0055-0145 - Corridor.dgn FILE NAME: USJH683007 LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
0055-0145
DESIGNER/DRAFTER: DG CHECKED BY:JAH
CROSS SECTIONS
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
15" R.C. PIPE
03.14Page 105
3:1
12:1 0.0% 5.4% -5.4% -5.4% 12:1
STA.18+00.00
-50
-50
-40
-40
-30
-30
-20
-20
-10
-10
0
0
10
10
20
20
30
30
40
40
50
50
300 300
310 310
320 320
330 330
EL = 318.20 EL = 318.20
SHDR
SHDR
EOR
EOR
5:1
12:12.0% 5.4%
-5.4% 12:1 3:1
STA.18+50.00
-50
-50
-40
-40
-30
-30
-20
-20
-10
-10
0
0
10
10
20
20
30
30
40
40
50
50
300 300
310 310
320 320
330 330
EL = 321.08
SHDR
SHDR
EOR
EOR
3:1
2.4% -5.4% 12:1 6:1
STA.19+00.00
-50
-50
-40
-40
-30
-30
-20
-20
-10
-10
0
0
10
10
20
20
30
30
40
40
50
50
310 310
320 320
330 330
340 340
EL = 324.67 EL = 324.67
SHDR
SHDR
EOR
EOR
2.4%
STA.19+50.00
-50
-50
-40
-40
-30
-30
-20
-20
-10
-10
0
0
10
10
20
20
30
30
40
40
50
50
310 310
320 320
330 330
340 340
MATCH EXIST.
STA.50+44.00
-50
-50
-40
-40
-30
-30
-20
-20
-10
-10
0
0
10
10
20
20
30
30
40
40
50
50
300 300
310 310
MATCH EXIST. MATCH EXIST.
TYPE "C" CB TYPE "C" CB
18" R.C. PIPE15" R.C. PIPE
15" R.C. PIPE
0
1" = 10'
HORIZONTAL SCALE
10' 20'
GLASTONBURY, CT 06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
DRAWING TITLE:
XSC-04
TOWN(S):
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD
PLOTTED DATE:
c:\bms\2\lbususer\d0153873\0055-0145 - Corridor.dgn FILE NAME: USJH683007 LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
0055-0145
DESIGNER/DRAFTER:DG CHECKED BY:JAH
CROSS SECTIONS
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE EX. HIGHWAY LINE
EX. HIGHWAY LINE EX. HIGHWAY LINE EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
EX. HIGHWAY LINE
HOLCOMB HILL ROAD
STA 18+15.50, 20' RT
L ENDWALL
INV = 315.30
- 0' -10' DEEP
18" R.C. PIPE
STA 17+88.80, 20' LT
STRAIGHT ENDWALL
TYPE C RIPRAP APRON
03.15Page 106
APPENDIX C DRAINAGE AREA PLANS
Page 107
PARAPET
PARAPET
FL=290.99
FL=290.73
FL=294.70
FL=296.92
FL=306.41
FL=309.86
FL=315.28
FL=314.02
W
INGW
ALL
WINGWALL
WINGWALL
WINGWALL
#780
CL&P
#781
CL&P
#782
CL&P
#783
HELCO
#784
CL&P
BT=305.98
FL=308.28
TF=311.88
BT=305.03
FL=307.13(S)
FL=307.33(NW)
TF=310.83
BT=305.29
FL=306.89(S)
FL=307.04(N)
TF=310.44
15
'' R
C
P
15'' RCP
18'' RCP
18'' CMP
BOXES
SPLICE
ELEC
A
P
P
R
O
X
. S
T
R
E
E
T
LIN
E
A
P
P
R
O
X
. S
T
R
E
E
T
LIN
E
APPROX. STREET LINE
APPROX. STREET LINE
APPROX. STREET LINE
APPROX. STREET LINE
142 SIMSBURY RD
KATHERINE C. DUNNINGTON
N/F
143 SIMSBURY RD
STEPHEN W HASTINGS
N/F
40 HOLCOMB RIDGE
GRANBY LAND TRUST
N/F
ENDWALL
ENDWALL
ENDWALL
ENDWALL
RCP
24''
24'' RCP
24'' RCP
OHW-1
OHW-2
OHW-3
OHW-4
OHW-5
OHW-6
CT3-1
CT3-2
CT3-3
OHW-6A
OHW-7A
OHW-8A
OHW-5A
OHW-4A
OHW-3A
OHW-2A
OHW-1A
CT1-10
CT1-9
CT1-8
CT1-7
CT1-6
CT1-5
CT1-4
CT1-3
CT1-2
CT1-1
W1-1
W1-2
W1-3
W1-4
W1-5
IWC1-1
IWC1-2
IWC1-3
IWC1-4
IWC1-5
IWC1-6
IWC1-7
H
O
LC
O
M
B
H
ILL R
O
A
D
SIMSBURY ROAD
W
EST BR
AN
C
H
SALMON BROOK
TO SIMSBURY
TO ROUTE 20
7
%
1
%
8
3
COORDINATE GRID
A
D
CONNECTICUT
TC = 5 MIN
C = 0.950
A = 0.051 AC
C - FE - STA 12+62.00, 6.00' LT
TC = 5 MIN
C = 0.950
A =0.016 AC
C - FE - STA 12+41.00, 14.00' RT
TC = 13 MIN
C = 0.310
A = 0.272 AC
STA 16+00.00 44.00' RT
eCB
TC = 29 MIN
C = 0.440
A 0.625 AC
STA 16+47.00, 5.00' RT
C - e CB
TC = 5 MIN
C = 0.654
A = 0.070 AC
STA 15+85.00, 37.00' RT
C - eCB
TC = 28 MIN
C = 0.360
A = 1.73 AC
STA 18+16.00, 13.00' RT
C - CL-EW
GLASTONBURY, CT 06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/15/2025
DRAWING TITLE:
EXS
TOWN(S):
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD
PLOTTED DATE:
c:\bms\2\lbususer\d0153873\HW_CP_0055-0145_EX-DRAINAGE.dgn FILE NAME: Deegan LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
0055-0145
DESIGNER/DRAFTER: CHECKED BY:
DRAINAGE MAP - EXISTING
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
0
1" = 40'
HORIZONTAL SCALE
40' 80'Page 108
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
19+00
50+00
291'
292'
2
9
3
'
2
9
4
'
2
9
5
'
2
9
6
'
2
9
7
'
2
9
8
' 2
9
9
'
300' 301' 302' 303' 304' 3 0
5
' 3
0
6
'
3
0
7
'
3
0
8
'
3
0
9
'
3
1
0
'
311'
312'
313'
314'
315'
316'
317'
318'
319'
320'
321'
322'
323'
324'
OHW-1
OHW-2
OHW-3
OHW-4
OHW-5
OHW-6
CT3-1
CT3-2
CT3-3
OHW-6A
OHW-7A
OHW-8A
OHW-5A
OHW-4A
OHW-3A
OHW-2A
OHW-1A
CT1-10
CT1-9
CT1-8
CT1-7
CT1-6
CT1-5
CT1-4
CT1-3
CT1-2
CT1-1
W1-1
W1-2
W1-3
W1-4
W1-5
IWC1-1
IWC1-2
IWC1-3
IWC1-4
IWC1-5
IWC1-6
IWC1-7
H
O
LC
O
M
B
H
ILL R
O
A
D
SIMSBURY ROAD
W
EST BR
AN
C
H
SALMON BROOK
TO SIMSBURY
TO ROUTE 20
TC = 13 MIN
C = 0.303
A = 0.272 AC
44.00' RT
C - eCB-STA 16+10.00,
TC = 28 MIN
C = 0.334
A = 1.705 AC
18+16.00, 20.00' RT
C - L - EW- STA
TC = 5 MIN
C = 0.654
A = 0.070 AC
37.00' RT
C - eCB-STA 15+85.00,
TC = 5 MIN
C = 0.95
A = 0.108 AC
15.00' LT
C - FE-STA 12+71.00,
TC = 5 MIN
C = 0.95
A = 0.028 AC
15.00' RT
C - FE-STA 12+14.00,
TC = 5 MIN
C = 0.950
A = 0.011 AC
15.00' RT
C-CB-STA 16+36.00,
8
3
COORDINATE GRID
A
D
CONNECTICUT
0
1" = 40'
HORIZONTAL SCALE
40' 80'
GLASTONBURY, CT 06033
500 WINDING BROOK DR
WSP USA INC
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
10/16/2025
DRAWING TITLE:
PRO
TOWN(S):
GRANBYOVER WEST BRANCH SALMON BROOK REPLACEMENT OF BRIDGE NO. 04525 - SIMSBURY ROAD
PLOTTED DATE:
c:\bms\2\lbususer\d0153873\HW_CP_0055-0145_PRO-DRAINAGE.dgn FILE NAME: USJH683007 LASTED SAVED BY:
REV. DATE REVISION DESCRIPTION
0055-0145
DESIGNER/DRAFTER: CHECKED BY:
DRAINAGE MAP - PROPOSED
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
TC = 27 MIN
C = 0.396
A = 0.919 AC
16+31.00, 21.00' RT
C - CB-C-L-STA Page 109
APPENDIX D STORMWATER DRAINAGE HYDROLOGIC INFORMATION
Page 110
/0/1/2/2□/2/4/5/6/7□/8/9/10□/11/12/5/13/14/15□/8/16/10□/11/15/17/7/18/12/19□/20 /21/12/22/6/4/18/12/19□/19/6/14/15/23□/24/15/7/4□/25/17/6/19/26/27/10□/28/12/19/19/15/22/4/18/22/13/4/10□/29/30/2/31 /21/6/4/18/4/13/32/15/23□/9/8/33/34/9/8/35/36/10□/21/12/19/37/18/4/13/32/15/23□/38/39/40/33/41/20/9/20/36 /42/5/15/43/6/4/18/12/19/23□/20/16/16□/44/4/31/31 /45□/47/48/49/50/51/52/53□/54/55/56/57□/58/59/60/47 /45/45□/47/48/49/50/51/52/53□/61/55/62/55 /63/1/64/0/65□/63/66/42/28/64/63/64/65/2/65/64/1/0□/67/66/42/68/29/42/0/28/69□/42/30/65/64/70/2/65/42/30 /55/59/71/72/59□/73/52/50/74/51/59/75□/55/59/71/76/50/59□/73/59/77/78/48/77/74/51/75□/58/74/51/79/59/52/78□/55/80/81□/82/59/49/50/52/71/80/75 □/83/59/50/78□/84/50/85/60/59/78/49/86/75□/87/59/78/52□/61/71/50/49/79/75□/88/50/78/59/71□/89/74/78/79/74/80/52 /90/88/91/91/75□/90/59/80/74/48/71/59/78□/89/52/59/80/79/52/50□/55/52/50/77/74/51/52/75□/55/74/78/77/52/50□/55/60/50/74/71/92/75□/58/59/50/85 /78/59/71/76 /93/94/95/96/97/98/99/100/97/101 □/102□ /93/94/95/103/101/97/104/105/106/107/97/100 □/102□ /108/97/104/109/95/110/95/97/111/101/106/97/100/109 /63/67□/4/6/26/13/5/6/17 /63/112/30 /38/26/6/7/15/32□/113/12/18/19/4□/113/17/15/22/18/113/18/4/6/4/18/12/19□/44/17/15/114/13/15/19/22/27□/15/7/4/18/14/6/4/15/7□/115/18/4/116 □/34/16/117□/22/12/19/44/18/32/15/19/22/15□/18/19/4/15/17/43/6/5/7□/118/18/19□ /18/19/22/116/15/7/119/116/12/13/17 /120/8 /112/13/17/6/4/18/12/19 /2/43/15/17/6/37/15□/17/15/22/13/17/17/15/19/22/15□/18/19/4/15/17/43/6/5□/118/27/15/6/17/7/120 /8 /40 /35 /8/16 /40/35 /35/16 /8/16/16 /40/16/16 /35/16/16 /8/16/16/16 /35/38/14/18/19 /9/33/40/16 /121/122/81/123/122/124/125/81/126/127/128 /35/33/16/16 /121/122/81/129/125/124/130/81/126/130/128 /131/33/20/40 /121/126/81/129/125/124/129/81/132/129/128 /39/33/9/20 /121/125/81/130/130/124/133/81/130/134/128 /41/33/34/9 /121/130/81/130/132/124/132/123/81/123/128 /8/16/33/8 /121/134/81/122/123/124/132/126/81/132/128 /8/8/33/20 /121/134/81/133/126/124/132/130/81/122/128 /8/40/33/131 /121/129/81/126/125/124/132/129/81/134/128 /8/9/33/9 /121/133/81/122/125/124/123/123/81/122/128 /8/35/33/34 /121/132/127/81/132/124/123/125/81/132/128 /8/16/38/14/18/19 /40/33/34/41 /121/123/81/123/133/124/122/81/129/122/128 /20/33/35/35 /121/123/81/134/122/124/126/81/125/134/128 /9/33/9/41 /121/122/81/126/122/124/125/81/129/127/128 /35/33/40/131 /121/126/81/127/132/124/130/81/129/125/128 /131/33/20/9 /121/126/81/130/133/124/129/81/130/122/128 /39/33/8/35 /121/125/81/132/129/124/133/81/133/125/128 /39/33/34/34 /121/125/81/130/122/124/132/132/81/130/128 /41/33/34/8 /121/125/81/133/129/124/132/122/81/122/128 /8/16/33/40 /121/130/81/130/132/124/132/125/81/129/128 /8/8/33/20 /121/134/81/132/122/124/132/134/81/129/128 /8/35/38/14/18/19 /40/33/20/20 /121/132/81/129/127/124/122/81/127/127/128 /40/33/39/41 /121/123/81/132/126/124/122/81/125/133/128 /20/33/35/40 /121/123/81/134/127/124/126/81/125/125/128 /9/33/8/20 /121/122/81/132/125/124/125/81/122/134/128 /9/33/34/39 /121/122/81/130/129/124/130/81/134/134/128 /35/33/131/16 /121/126/81/127/130/124/134/81/129/132/128 /131/33/40/131 /121/126/81/126/123/124/133/81/127/134/128 /131/33/34/34 /121/126/81/134/127/124/132/127/81/126/128 /41/33/16/8 /121/125/81/132/133/124/132/123/81/126/128 /41/33/41/9 /121/125/81/125/133/124/132/126/81/127/128 /20/16/38/14/18/19 /8/33/35/41 /121/132/81/123/123/124/123/81/127/126/128 /8/33/41/34 /121/132/81/126/130/124/123/81/126/126/128 /40/33/9/16 /121/132/81/129/126/124/122/81/132/132/128 /40/33/41/40 /121/123/81/132/125/124/122/81/130/129/128 /20/33/9/8 /121/123/81/125/123/124/126/81/130/126/128 /20/33/41/9 /121/123/81/134/133/124/125/81/122/130/128 /9/33/20/16 /121/122/81/127/122/124/130/81/123/123/128 /9/33/41/16 /121/122/81/123/123/124/134/81/132/125/128 /35/33/35/8 /121/122/81/125/134/124/129/81/125/132/128 /131/33/16/41 /121/122/81/129/125/124/133/81/130/127/128 /131/16/38/14/18/19 /8/33/16/16 /121/127/81/134/134/127/124/132/81/123/133/128 /8/33/40/16 /121/127/81/133/123/123/124/132/81/125/126/128 /8/33/35/40 /121/132/81/132/134/124/132/81/133/134/128 /8/33/39/34 /121/132/81/122/134/124/123/81/122/122/128 /40/33/8/131 /121/132/81/130/127/124/123/81/133/125/128 /40/33/9/9 /121/132/81/134/134/124/122/81/126/127/128 /40/33/39/20 /121/132/81/133/122/124/122/81/133/130/128 /20/33/16/35 /121/123/81/127/125/124/126/81/125/126/128 /20/33/35/16 /121/123/81/123/134/124/125/81/126/123/128 /20/33/41/39 /121/123/81/126/125/124/130/81/132/132/128 /40/38/116/17 /16/33/131/9/20 /121/127/81/126/133/129/124/127/81/129/123/123/128 /16/33/39/131/41 /121/127/81/125/133/125/124/127/81/133/129/126/128 /16/33/34/39/9 /121/127/81/134/125/132/124/132/81/123/125/128 /8/33/8/9 /121/127/81/129/134/129/124/132/81/126/129/128 /8/33/20/41 /121/132/81/127/122/124/132/81/129/134/128 /8/33/35/35 /121/132/81/132/126/124/123/81/132/130/128 /8/33/39/9 /121/132/81/123/126/124/123/81/125/123/128 /8/33/34/131 /121/132/81/122/123/124/123/81/133/127/128 /40/33/40/41 /121/132/81/126/129/124/122/81/125/127/128 /40/33/35/9 /121/132/81/130/132/124/126/81/127/127/128 /20/38/116/17 /16/33/9/34/40 /121/127/81/122/129/123/124/127/81/130/123/134/128 /16/33/35/34/16 /121/127/81/126/125/129/124/127/81/134/125/123/128 /16/33/39/9/34 /121/127/81/125/129/127/124/127/81/133/130/127/128 /16/33/41/41/40 /121/127/81/130/134/133/124/132/81/132/126/128 /8/33/16/131 /121/127/81/134/133/134/124/132/81/126/126/128 /8/33/40/16 /121/127/81/129/129/123/124/132/81/130/134/128 /8/33/20/9 /121/127/81/133/130/125/124/132/81/133/130/128 /8/33/35/40 /121/132/81/127/122/124/123/81/123/125/128 /8/33/39/41 /121/132/81/132/130/124/123/81/134/126/128 /40/33/16/8 /121/132/81/123/129/124/122/81/132/125/128 /131/38/116/17 /16/33/20/16/34 /121/127/81/123/126/123/124/127/81/122/133/132/128 /16/33/20/39/35 /121/127/81/123/133/122/124/127/81/126/134/125/128 /16/33/9/41/20 /121/127/81/122/134/130/124/127/81/130/132/126/128 /16/33/35/39/40 /121/127/81/126/126/122/124/127/81/134/122/123/128 /16/33/131/34/35 /121/127/81/125/123/126/124/127/81/133/122/133/128 /16/33/39/41/35 /121/127/81/125/129/123/124/132/81/127/133/128 /16/33/41/41/9 /121/127/81/130/126/132/124/132/81/123/133/128 /8/33/16/8 /121/127/81/130/129/123/124/132/81/126/129/128 /8/33/40/16 /121/127/81/134/129/123/124/132/81/129/122/128 /8/33/20/39 /121/127/81/129/134/123/124/123/81/132/122/128 /8/40/38/116/17 /16/33/8/41/41 /121/127/81/132/126/129/124/127/81/123/122/130/128 /16/33/40/20/20 /121/127/81/132/129/122/124/127/81/123/133/122/128 /16/33/20/16/35 /121/127/81/123/122/133/124/127/81/122/129/130/128 /16/33/20/131/131 /121/127/81/123/129/125/124/127/81/126/130/125/128 /16/33/9/9/34 /121/127/81/122/126/132/124/127/81/130/127/125/128 /16/33/35/8/16 /121/127/81/122/129/132/124/127/81/134/127/134/128 /16/33/35/39/39 /121/127/81/126/123/123/124/127/81/129/126/132/128 /16/33/131/131/20 /121/127/81/126/125/127/124/127/81/133/134/123/128 /16/33/41/16/16 /121/127/81/125/123/122/124/132/81/123/123/128 /16/33/34/40/16 /121/127/81/125/129/129/124/132/81/126/122/128 /40/9/38/116/17 /16/33/8/8/16 /121/127/81/127/129/134/124/127/81/132/122/129/128 /16/33/8/20/34 /121/127/81/132/132/127/124/127/81/132/134/126/128 /16/33/8/41/131 /121/127/81/132/126/134/124/127/81/123/122/126/128 /16/33/40/40/131 /121/127/81/132/134/134/124/127/81/123/129/125/128 /16/33/40/41/16 /121/127/81/123/132/126/124/127/81/122/134/130/128 /16/33/20/8/34 /121/127/81/123/126/127/124/127/81/126/126/132/128 /16/33/20/131/20 /121/127/81/123/130/129/124/127/81/125/123/133/128 /16/33/9/40/16 /121/127/81/123/129/130/124/127/81/130/132/122/128 /16/33/35/8/9 /121/127/81/122/122/134/124/127/81/134/134/133/128 /16/33/35/34/39 /121/127/81/122/129/122/124/127/81/133/123/126/128 /40/38/32/6/27 /16/33/16/131/40 /121/127/81/127/126/133/124/127/81/127/134/134/128 /16/33/16/39/34 /121/127/81/127/130/122/124/127/81/127/133/133/128 /16/33/8/16/41 /121/127/81/127/129/130/124/127/81/132/122/125/128 /16/33/8/20/40 /121/127/81/132/127/126/124/127/81/132/130/125/128 /16/33/8/131/9 /121/127/81/132/123/134/124/127/81/123/123/127/128 /16/33/8/41/41 /121/127/81/132/126/122/124/127/81/123/130/127/128 /16/33/40/8/35 /121/127/81/132/130/127/124/127/81/122/132/126/128 /16/33/40/35/8 /121/127/81/132/134/132/124/127/81/122/130/125/128 /16/33/20/8/8 /121/127/81/123/127/125/124/127/81/126/134/127/128 /16/33/20/131/131 /121/127/81/123/122/125/124/127/81/125/130/122/128 /20/38/32/6/27 /16/33/16/9/35 /121/127/81/127/122/130/124/127/81/127/125/130/128 /16/33/16/35/41 /121/127/81/127/126/130/124/127/81/127/134/123/128 /16/33/16/39/34 /121/127/81/127/130/122/124/127/81/127/133/129/128 /16/33/16/34/131 /121/127/81/127/134/130/124/127/81/132/123/127/128 /16/33/8/40/16 /121/127/81/127/133/122/124/127/81/132/130/132/128 /16/33/8/20/39 /121/127/81/132/127/125/124/127/81/132/133/127/128 /16/33/8/35/39 /121/127/81/132/132/129/124/127/81/123/123/133/128 /16/33/8/41/9 /121/127/81/132/123/130/124/127/81/123/130/134/128 /16/33/40/40/34 /121/127/81/132/125/132/124/127/81/122/126/125/128 /16/33/40/39/16 /121/127/81/132/134/126/124/127/81/126/132/126/128 /9/38/32/6/27 /16/33/16/20/131 /121/127/81/127/123/133/124/127/81/127/126/125/128 /16/33/16/9/39 /121/127/81/127/122/134/124/127/81/127/125/134/128 /16/33/16/131/20 /121/127/81/127/125/132/124/127/81/127/134/133/128 /16/33/16/39/39 /121/127/81/127/130/132/124/127/81/127/133/130/128 /16/33/16/34/131 /121/127/81/127/134/125/124/127/81/132/123/133/128 /16/33/8/8/16 /121/127/81/127/129/126/124/127/81/132/125/123/128 /16/33/8/40/131 /121/127/81/127/133/125/124/127/81/132/129/126/128 /16/33/8/9/41 /121/127/81/132/127/132/124/127/81/123/132/122/128 /16/33/8/41/9 /121/127/81/132/123/132/124/127/81/123/134/130/128 /16/33/40/8/39 /121/127/81/132/126/127/124/127/81/122/122/123/128 /39/38/32/6/27 /16/33/16/40/35 /121/127/81/127/123/127/124/127/81/127/122/127/128 /16/33/16/20/8 /121/127/81/127/123/125/124/127/81/127/122/129/128 /16/33/16/9/40 /121/127/81/127/122/126/124/127/81/127/125/123/128 /16/33/16/35/8 /121/127/81/127/126/132/124/127/81/127/130/126/128 /16/33/16/131/9 /121/127/81/127/126/133/124/127/81/127/129/126/128 /16/33/16/39/20 /121/127/81/127/125/130/124/127/81/127/133/133/128 /16/33/16/41/20 /121/127/81/127/130/123/124/127/81/132/123/127/128 /16/33/16/34/131 /121/127/81/127/130/130/124/127/81/132/122/133/128 /16/33/8/8/34 /121/127/81/127/134/133/124/127/81/132/134/129/128 /16/33/8/9/16 /121/127/81/127/133/127/124/127/81/123/132/122/128 /8/16/38/32/6/27 /16/33/16/40/16 /121/127/81/127/132/130/124/127/81/127/123/125/128 /16/33/16/40/35 /121/127/81/127/123/127/124/127/81/127/122/132/128 /16/33/16/20/20 /121/127/81/127/123/134/124/127/81/127/126/132/128 /16/33/16/9/16 /121/127/81/127/122/123/124/127/81/127/126/133/128 /16/33/16/9/34 /121/127/81/127/122/129/124/127/81/127/130/126/128 /16/33/16/35/35 /121/127/81/127/126/123/124/127/81/127/134/125/128 /16/33/16/131/20 /121/127/81/127/126/134/124/127/81/127/133/127/128 /16/33/16/39/20 /121/127/81/127/125/127/124/127/81/132/127/125/128 /16/33/16/41/34 /121/127/81/127/125/133/124/127/81/132/122/122/128 /16/33/8/16/9 /121/127/81/127/130/134/124/127/81/132/125/133/128 /40/16/38/32/6/27 /16/33/16/8/9 /121/127/81/127/132/123/124/127/81/127/132/134/128 /16/33/16/8/39 /121/127/81/127/132/126/124/127/81/127/123/132/128 /16/33/16/40/8 /121/127/81/127/132/134/124/127/81/127/123/130/128 /16/33/16/40/9 /121/127/81/127/123/127/124/127/81/127/122/127/128 /16/33/16/40/34 /121/127/81/127/123/122/124/127/81/127/122/129/128 /16/33/16/20/20 /121/127/81/127/123/125/124/127/81/127/126/126/128 /16/33/16/20/39 /121/127/81/127/123/134/124/127/81/127/125/123/128 /16/33/16/9/8 /121/127/81/127/123/133/124/127/81/127/125/133/128 /16/33/16/9/34 /121/127/81/127/122/122/124/127/81/127/134/122/128 /16/33/16/35/131 /121/127/81/127/122/130/124/127/81/127/129/130/128 /20/16/38/32/6/27 /16/33/16/8/40 /121/127/81/127/132/127/124/127/81/127/132/126/128 /16/33/16/8/9 /121/127/81/127/132/132/124/127/81/127/132/134/128 /16/33/16/8/131 /121/127/81/127/132/122/124/127/81/127/123/127/128 /16/33/16/8/34 /121/127/81/127/132/125/124/127/81/127/123/122/128 /16/33/16/40/40 /121/127/81/127/132/134/124/127/81/127/123/129/128 /16/33/16/40/9 /121/127/81/127/132/133/124/127/81/127/122/123/128 /16/33/16/40/39 /121/127/81/127/123/127/124/127/81/127/122/134/128 /16/33/16/20/16 /121/127/81/127/123/132/124/127/81/127/126/122/128 /16/33/16/20/35 /121/127/81/127/123/122/124/127/81/127/125/123/128 /16/33/16/20/34 /121/127/81/127/123/125/124/127/81/127/125/133/128 /9/35/38/32/6/27 /16/33/16/8/16 /121/127/81/127/127/129/124/127/81/127/132/123/128 /16/33/16/8/8 /121/127/81/127/127/133/124/127/81/127/132/122/128 /16/33/16/8/20 /121/127/81/127/132/132/124/127/81/127/132/130/128 /16/33/16/8/35 /121/127/81/127/132/123/124/127/81/127/132/129/128 /16/33/16/8/39 /121/127/81/127/132/122/124/127/81/127/123/132/128 /16/33/16/8/41 /121/127/81/127/132/126/124/127/81/127/123/126/128 /16/33/16/40/16 /121/127/81/127/132/125/124/127/81/127/123/129/128 /16/33/16/40/40 /121/127/81/127/132/125/124/127/81/127/122/132/128 /16/33/16/40/35 /121/127/81/127/132/130/124/127/81/127/122/134/128 /16/33/16/40/39 /121/127/81/127/132/134/124/127/81/127/126/132/128 /131/16/38/32/6/27 /16/33/16/16/34 /121/127/81/127/127/134/124/127/81/127/132/127/128 /16/33/16/16/34 /121/127/81/127/127/129/124/127/81/127/132/132/128 /16/33/16/8/8 /121/127/81/127/127/133/124/127/81/127/132/122/128 /16/33/16/8/40 /121/127/81/127/132/127/124/127/81/127/132/125/128 /16/33/16/8/9 /121/127/81/127/132/132/124/127/81/127/132/129/128 /16/33/16/8/35 /121/127/81/127/132/123/124/127/81/127/123/127/128 /16/33/16/8/39 /121/127/81/127/132/123/124/127/81/127/123/123/128 /16/33/16/8/41 /121/127/81/127/132/123/124/127/81/127/123/125/128 /16/33/16/40/16 /121/127/81/127/132/122/124/127/81/127/123/133/128 /16/33/16/40/8 /121/127/81/127/132/126/124/127/81/127/122/123/128 /132□/73/50/52/51/74/60/74/80/59/80/74/48/71□/135/50/52/136/49/52/71/51/85□/121/73/137/128□/52/47/80/74/138/59/80/52/47□/74/71□/80/79/74/47□/80/59/139 /78/52□/59/50/52□/139/59/47/52/76□/48/71□/135/50/52/136/49/52/71/51/85□/59/71/59/78/85/47/74/47□/48/135□ /60/59/50/80/74/59/78□/76/49/50/59/80/74/48/71□/47/52/50/74/52/47□/121/73/87/55/128 /81 /90/49/138/139/52/50/47□/74/71□/60/59/50/52/71/80/79/52/47/74/47□/59/50/52□/73/137□/52/47/80/74/138/59/80/52/47□/59/80□/78/48/140/52/50□/59/71 /76□/49/60/60/52/50□/139/48/49/71/76/47□/48/135□/80/79/52□/133/127/141□/51/48/71/135/74/76/52/71/51/52□/74/71/80/52/50/77/59/78/81□/84/79/52□ /60/50/48/139/59/139/74/78/74/80/85□/80/79/59/80□/60/50/52/51/74/60/74/80/59/80/74/48/71□/135/50/52/136/49/52/71/51/85□/52/47/80/74/138/59/80/52/47□ /121/135/48/50 /59□/92/74/77/52/71□/76/49/50/59/80/74/48/71□/59/71/76□/59/77/52/50/59/92/52□/50/52/51/49/50/50/52/71/51/52□/74/71/80/52/50/77/59/78/128□/140 /74/78/78□/139/52□/92/50/52/59/80/52/50□/80/79/59/71□/80/79/52□/49/60/60/52/50□/139/48/49/71/76□/121/48/50□/78/52/47/47□/80/79/59/71□/80 /79/52□/78/48/140/52/50□/139/48/49/71/76/128□/74/47□/125/141/81□/54/47/80/74/138/59/80/52/47□/59/80□/49/60/60/52/50□/139/48/49/71/76/47□/59/50 /52□/71/48/80 /51/79/52/51/86/52/76□/59/92/59/74/71/47/80□/60/50/48/139/59/139/78/52□/138/59/142/74/138/49/138□/60/50/52/51/74/60/74/80/59/80/74/48/71□/121/73/58/73 /128□/52/47/80/74/138/59/80/52/47□/59/71/76□/138/59/85□/139/52□/79/74/92/79/52/50□/80/79/59/71□/51/49/50/50/52/71/80/78/85□/77/59/78/74/76□ /73/58/73□/77/59/78/49/52/47/81 /73/78/52/59/47/52□/50/52/135/52/50□/80/48□/90/88/91/91□/91/80/78/59/47□/132/126□/76/48/51/49/138/52/71/80□/135/48/50□/138/48/50/52□/74/71/135 /48/50/138/59/80/74/48/71/81 /143/97/107/144□/96/146□/147/146/104 /63/67□/37/17/6/113/116/18/22/6/5 /132/127/148/122/148/123/125/75□/123/53/126/129□/73/58 /73/50/52/51/74 /60/74/80/59/80/74/48/71□/137/50/52 /136/49/52/71/51 /85□/87/59/80/59□/55/52/50/77/52/50 /79/80/80 /60/47/53/148/148/79/76/47/51/81/71/140/47/81/71/48/59/59/81 /92/48/77/148 /60/135/76/47/148 /60/135/76/47 /149/60 /50/74/71/80 /60/59/92/52/81/79/80/138/78/150/78/59/80/151/126/132/81/133/126/132/125/152/78/48/71/151/153/134/123/81/129/122/126/122/152/76/59/80/59/151/74/71/80/52/71/47/74/80 /85/152/49/71/74/80/47/151/52/71 /92/78/74/47/79/152/47/52/50/74/52/47/151 /60/76/47 /132/148/126
Page 111
/0/1/2/3□/5/6□/7/6/8 /9/10/11/12□/14□/10/15/16/17/10/18/12 /19/20/10/18/18□/12/21/10/18/15□/22/15/16/16/10/17/23 /24/25/26/27/26/28/29/30□/28/32/33/34□/35/36 /35/37/38/39/40 /41/40/42/43/42/40/44/45□/46/37/38 /47/48/38/45/39 /49□/50/43/42/43□/51/38/37/52/38/37 /53/42/42 /41/54/32/26/26/53/55/54/39/56/45/57/54/56/45/44/43/43/56 /58/44/52/26 /41/59/55/54/26 /41/59/55/54 /60/41 /37/40/45/42 /41/43/58/38/56/53/42/61/62/63/62/43/42/64/33/24/56/65/33/24/29/66/62/44/45/64/67/68/28/56/34/27/33/27/66/55/43/42/43/64/40/45/42/38/45/54/40/42 /49/66/48/45/40/42/54/64/38/45 /58/62/40/54/53/66/54/38/37/40/38/54/64 /41/55/54 /28/26/33
Page 112
/0/1/2/3/4□/6/7/1/8/4□/9/4/2/2/1/10/11 /0/1/2/3/4□/6/7/1/8/4□/12/1/13 /0/1/2/3/4□/6/7/1/8/4□/1/4/2/10/1/8 /14 /15 /16/17/18 /19/18/20 /14 /15 /21/22/22/17/18 /23/22/18/20 /14 /15 /21/22/22/17/18 /23/22/18/20 /24/25/26/27/26/28/29/30□/28/32/33/34□/35/36 /35/37/38/39/40 /41/40/42/43/42/40/44/45□/46/37/38 /47/48/38/45/39 /49□/50/43/42/43□/51/38/37/52/38/37 /53/42/42 /41/54/32/26/26/53/55/54/39/56/45/57/54/56/45/44/43/43/56 /58/44/52/26 /41/59/55/54/26 /41/59/55/54 /60/41 /37/40/45/42 /41/43/58/38/56/53/42/61/62/63/62/43/42/64/33/24/56/65/33/24/29/66/62/44/45/64/67/68/28/56/34/27/33/27/66/55/43/42/43/64/40/45/42/38/45/54/40/42 /49/66/48/45/40/42/54/64/38/45 /58/62/40/54/53/66/54/38/37/40/38/54/64 /41/55/54 /27/26/33
Page 113
/0/1/2/3□/5/6□/7/6/8 /9/10□/11/12/8/1/13/5/14/12/15/5□/6/16□/17/6/14/14/12/13/2/12 /18/1/5/19/6/15/1/20□/21/2/12/1/15/19/2□/1/15/22□/23/5/14/6/24/8/25/12/13/19/2□/23/22/14/19/15/19/24/5/13/1/5/19/6/15 /18/1/5/19/6/15/1/20□/26/12/1/5/25/12/13□/10/12/13/27/19/2/12 /18/1/5/19/6/15/1/20□/26/1/5/12/13□/17/12/15/5/12/13 /28/29/30/31□/33/34/35/36□/37/38/35/36□/39/40/41/42/43/34/44 /45/40/46/47/38/48□/45/49/48/40/50/41/51□/52/53□/30/54/55/28/54 /56/57/38/35/36/40/58/50/35/59/60□ /61/11/10/17/62/63/64/12/24/5/19/6/15/24/65/15/6/1/1/62/66/6/27 /11/19/24/2/20/1/19/14/12/13 /67 /68 /69/70/70/71/72 /73/70/72/74 /75/76/77/78/77/79/80/81□/79/83/84/85□/86/87 /86/88/89/90/91 /92/91/93/94/93/91/95/96□/97/88/89 /98/99/89/96/90 /100□/101/94/93/94□/102/89/88/103/89/88 /104/93/93 /92/105/83/77/77/104/106/105/90/107/96/108/105/107/96/95/94/94/107 /109/95/103/77 /92/110/106/105/77 /92/110/106/105 /111/92 /88/91/96/93 /92/94/109/89/107/104/93/112/113/114/113/94/93/115/84/75/107/116/84/75/80/117/113/95/96/115/118/119/79/107/85/78/84/78/117/106/94/93/94/115/91/96/93/89/96/105/91/93 /100/117/99/96/91/93/105/115/89/96 /109/113/91/105/104/117/105/89/88/91/89/105/115 /92/106/105 /84/77/84
Page 114
Hydrologic Soil Group—State of Connecticut, Western Part (Simsbury Road, Granby, CT) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/2/2025 Page 1 of 5 4644700 4644900 4645100 4645300 4645500 4645700 4645900 4646100 4646300 4646500 4646700 4646900 4647100 4644700 4644900 4645100 4645300 4645500 4645700 4645900 4646100 4646300 4646500 4646700 4646900 4647100 678800 679000 679200 679400 679600 679800 680000 680200 678800 679000 679200 679400 679600 679800 680000 680200 41° 57' 21'' N 72° 50' 39'' W 41° 57' 21'' N 72° 49' 31'' W 41° 55' 58'' N 72° 50' 39'' W 41° 55' 58'' N 72° 49' 31'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 18N WGS84 0 300 600 1200 1800 Feet 0 100 200 400 600 Meters Map Scale: 1:7,160 if printed on B portrait (11" x 17") sheet.
Page 115
MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:12,000. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: State of Connecticut, Western Part Survey Area Data: Version 6, Sep 16, 2025 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jun 14, 2022—Jul 1, 2024 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—State of Connecticut, Western Part (Simsbury Road, Granby, CT) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/2/2025 Page 2 of 5
Page 116
Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 2 Ridgebury fine sandy loam, 0 to 3 percent slopes D 3.4 0.7% 3 Ridgebury, Leicester, and Whitman soils, 0 to 8 percent slopes, extremely stony D 19.1 4.1% 12 Raypol silt loam, 0 to 3 percent slopes B/D 6.3 1.3% 23A Sudbury sandy loam, 0 to 5 percent slopes A/D 32.6 6.9% 29A Agawam fine sandy loam, 0 to 3 percent slopes B 7.4 1.6% 29B Agawam fine sandy loam, 3 to 8 percent slopes B 5.2 1.1% 34A Merrimac fine sandy loam, 0 to 3 percent slopes A 12.9 2.7% 37C Manchester gravelly sandy loam, 3 to 15 percent slopes A 29.0 6.2% 37E Manchester gravelly sandy loam, 15 to 45 percent slopes A 7.2 1.5% 38A Hinckley loamy sand, 0 to 3 percent slopes A 2.8 0.6% 38C Hinckley loamy sand, 3 to 15 percent slopes A 75.3 16.0% 38E Hinckley loamy sand, 15 to 45 percent slopes A 10.6 2.3% 45B Woodbridge fine sandy loam, 3 to 8 percent slopes C/D 17.7 3.8% 46B Woodbridge fine sandy loam, 0 to 8 percent slopes, very stony C/D 48.8 10.4% 47C Woodbridge fine sandy loam, 3 to 15 percent slopes, extremely stony C/D 15.4 3.3% 52C Sutton fine sandy loam, 2 to 15 percent slopes, extremely stony B/D 1.5 0.3% Hydrologic Soil Group—State of Connecticut, Western Part Simsbury Road, Granby, CT Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/2/2025 Page 3 of 5
Page 117
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 75E Hollis-Chatfield-Rock outcrop complex, 15 to 45 percent slopes D 1.4 0.3% 84B Paxton and Montauk fine sandy loams, 3 to 8 percent slopes C 33.5 7.1% 84C Paxton and Montauk fine sandy loams, 8 to 15 percent slopes C 16.5 3.5% 85B Paxton and Montauk fine sandy loams, 3 to 8 percent slopes, very stony C 20.3 4.3% 85C Paxton and Montauk fine sandy loams, 8 to 15 percent slopes, very stony C 20.2 4.3% 86C Paxton and Montauk fine sandy loams, 3 to 15 percent slopes, extremely stony C 8.4 1.8% 86D Paxton and Montauk fine sandy loams, 15 to 35 percent slopes, extremely stony C 1.6 0.3% 100 Suncook loamy fine sand A 21.5 4.6% 101 Occum fine sandy loam B 44.9 9.6% 103 Rippowam fine sandy loam B/D 3.2 0.7% 308 Udorthents, smoothed B 2.7 0.6% Totals for Area of Interest 469.4 100.0% Hydrologic Soil Group—State of Connecticut, Western Part Simsbury Road, Granby, CT Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/2/2025 Page 4 of 5
Page 118
Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—State of Connecticut, Western Part Simsbury Road, Granby, CT Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/2/2025 Page 5 of 5
Page 119
Comp By: EAR 10/9/2025 Chkd By: SG 10/13/2025 Southwest (LEFT) Bridge curbline: FE-STA 12+62.00, 6.00' LT Description Area (SF) C CA (SF) CA (ac) Time of Concentration (min) Impervious 2214 0.95 2103 Avg Slope (Hyd Grp A & B) 0 0.17 0 Total 2214 0.950 2103 0.049 5 0.051 ac Southeast (RIGHT) Bridge curbline: FE-STA 12+41.00, 14.00' RT Description Area (SF) C CA (SF) CA (ac) Time of Concentration (min) Impervious 683 0.95 649 Avg Slope (Hyd Grp A & B) 0 0.17 0 Total 683 0.950 649 0.015 5 0.016 ac NORTH OF SIMSBURY RD AT HOLCOMB HILL ROAD INTERSECTION: eCB STA 16+47.00, 5.00' RT Description Area (SF) C CA (SF) CA (ac) Time of Concentration (min) Impervious 9166 0.95 8708 Avg Slope (Hyd Grp A & B) 18038 0.17 3066 Total 27204 0.440 11774 0.271 29 0.625 ac Existing L ENDWALL: cL-EW-STA 18+16.00, 13.00' RT Description Area (SF) C CA (SF) CA (ac) Time of Concentration (min) Impervious 17509.5 0.95 16634 Avg Slope (Hyd Grp A & B) 57623.5 0.17 9796 Total 75133 0.360 26430 0.607 28 1.725 ac HOLCOMB HILL ROAD EAST: eCB-STA 16+10.00, 44.00' RT Description Area (SF) C CA (SF) CA (ac) Time of Concentration (min) Impervious 2,012 0.95 1911 Avg Slope (Hyd Grp A & B) 9815 0.17 1669 Total 11827 0.310 3580 0.083 13 0.272 ac HOLCOMB HILL ROAD WEST Curbline: eCB-STA 15+85.00, 37.00' RT Description Area (SF) C CA (SF) CA (ac) Time of Concentration (min) Impervious 1893.75 0.95 1799 Avg Slope (Hyd Grp A & B) 1155.45 0.17 196.43 Total 3049.2 0.654 1995 0.046 5 .070 ac BRIDGE NO. 04525 RATIONAL METHOD Existing Condition SIMSBURY RD OVER WEST BRANCH SALMON BROOK STATE PROJECT NO. 0055-0145
Page 120
Comp By: EAR 10/9/2025 Chkd By: SG 10/13/2025 Southwest (LEFT) Bridge curbline: FE-STA 12+71.00, 15.00 LT Description Area (SF) C CA (SF) CA (ac) Time of Concentration (min) Impervious 4704.48 0.95 4469 Avg Slope (Hyd Grp A & B) 0 0.17 0 Total 4704.48 0.950 4469 0.102 5 0.108 ac Southeast (RIGHT) Bridge curbline: FE-STA 12+14.00, 15.00 RT Description Area (SF) C CA (SF) CA (ac) Time of Concentration (min) Impervious 1219.68 0.95 1159 Avg Slope (Hyd Grp A & B) 0 0.17 0 Total 1219.68 0.950 1159 0.026 5 0.028 ac PROPOSED - NORTH OF SIMSBURY RD AT HOLCOMB HILL ROAD INTERSECTION: CB-STA 16+36.00, 15.00' RT Description Area (SF) C CA (SF) CA (ac) Time of Concentration (min) Impervious 479.16 0.95 455 Avg Slope (Hyd Grp A & B) 0 0.17 0 Total 479.16 0.950 455 0.010 5 0.011 ac PROPOSED - IN GRASS NORTHEAST OF SIMSBURY RD AT HOLCOMB ROAD INTERSECTION: CB-C-L-STA 16+31.00, 21.00' RT Description Area (SF) C CA (SF) CA (ac) Time of Concentration (min) Impervious 11773.341 0.95 11185 Avg Slope (Hyd Grp A & B) 28258.299 0.17 4804 Total 40031.64 0.396 15989 0.364 27 0.919 ac PROPOSED L ENDWALL: L-EW-STA 18+16.00, 20.00' RT Description Area (SF) C CA (SF) CA (ac) Time of Concentration (min) Impervious 15807.59 0.95 15017 Avg Slope (Hyd Grp A & B) 58462.21 0.17 9938.6 Total 74269.8 0.334 24956 0.569 28 1.705 HOLCOMB HILL ROAD EAST: eCB-STA 16+10.00, 44.00' RT Description Area (SF) C CA (SF) CA (ac) Time of Concentration (min) Impervious 2,047 0.95 1944 Avg Slope (Hyd Grp A & B) 9801.5 0.17 1666 Total 11848.32 0.303 3611 0.082 13 0.272 ac HOLCOMB HILL ROAD WEST Curbline: eCB-STA 15+85.00, 37.00' RT BRIDGE NO. 04525 RATIONAL METHOD Proposed Condition SIMSBURY RD OVER WEST BRANCH SALMON BROOK STATE PROJECT NO. 0055-0145
Page 121
Comp By: EAR 10/9/2025 Chkd By: SG 10/13/2025 BRIDGE NO. 04525 RATIONAL METHOD SIMSBURY RD OVER WEST BRANCH SALMON BROOK STATE PROJECT NO. 0055-0145 Description Area (SF) C CA (SF) CA (ac) Time of Concentration (min) Impervious 1893.75 0.95 1799 Avg Slope (Hyd Grp A & B) 1155.45 0.17 196.43 Total 3049.2 0.654 1995 0.046 5 .070 ac
Page 122
PROJECT: SIMSBURY RD OVER WEST BRANCH SALMON BROOK DATE: 10/09/25 EAR PROJECT NO.: 0055-0145 TOWN: Granby, CT DATE: 10/13/25 SG ROUTE: Simsbury Road LOCATION: PROPOSED IN GRASS NORTHEAST OF SIMSBURY RD AT HOLCOMB HILL ROAD INTERSECTION Time of Concentration - CB-C-L-STA 16+31.00, 20.00' RT TOTALS (min) + 10.8 + 8.6 + 5.4 + 0.3 + 0.7 + 0.5 + 0 26.3 SAY: 27 0.07 2-yr, 24-hr Rainfall Depth, P2 (in): 3.36 3.36 Sheet Flow Travel Time (min): 5.1 0.3 Surface Description: Unpaved Unpaved Slope of Hydraulic Grade Line, S (ft/ft): 0.17 0.12 Average Velocity, V (ft/s): 6.73 5.57 Surface Description: Unpaved Unpaved Flow Length, L (ft): 46 63 Flow Length, L (ft): 112 DESIGNED BY: CHECKED BY: Sheet Flow Surface Description: Dense grasses Smooth asphalt Slope of Hydraulic Grade Line, S (ft/ft): 0.02 0.05 2-yr, 24-hr Rainfall Depth, P2 (in): 3.36 3.36 Manning's Roughness Coefficient, n: 0.24 0.011 Flow Length, L (ft): 63 37.7 Manning's Roughness Coefficient, n: 0.011 0.24 Flow Length, L (ft): 34 59.7 Sheet Flow Travel Time (min): 10.4 0.4 Surface Description: Smooth asphalt Dense grasses Sheet Flow Travel Time (min): 0.7 7.9 Shallow Concentrated Slope of Hydraulic Grade Line, S (ft/ft): 0.01 0.03 2-yr, 24-hr Rainfall Depth, P2 (in): 3.36 3.36 Surface Description: Dense grasses Smooth asphalt Manning's Roughness Coefficient, n: 0.24 0.011 Flow Length, L (ft): 36 29 Slope of Hydraulic Grade Line, S (ft/ft): 0.03 33.8 Slope of Hydraulic Grade Line, S (ft/ft): 0.06 0.03 Sheet Flow Travel Time (min): 0.1 0.2 Surface Description: Unpaved Unpaved Open Channel Flow Manning's Roughness Coefficient, n: Average Velocity, V (ft/s): 3.89 2.98 Sheet Flow Travel Time (min): 0.5 0.2 Flow Length, L (ft): 112 4 Slope of Hydraulic Grade Line, S (ft/ft): 0.06 0.42 Average Velocity, V (ft/s): 3.89 10.52 Sheet Flow Travel Time (min): 0.5 0 Cross Sectional Flow Area, a (ft*ft): Wetted Perimeter, pw (ft): Flow Length, L (ft): Slope of Hydraulic Grade Line, S (ft/ft): Sheet Flow Travel Time (min): 0 0 Total Time of Concentration Path, Tt (min): Hydraulic Radius, r = a/pw (ft): Average Velocity, V (ft/s):
Page 123
PROJECT: SIMSBURY RD OVER WEST BRANCH SALMON BROOK DATE: 10/09/25 EAR PROJECT NO.: 55-145 TOWN: Granby, CT DATE: 10/10/25 SG ROUTE: Simsbury Road LOCATION: STA 18+16.00, 13.00' RT Time of Concentration - Existing L Endwall TOTALS (min) + 12.4 + 14.6 + 0.6 + 0.1 + 0 27.7 SAY: 28 Sheet Flow Travel Time (min): 0 0 Total Time of Concentration Path, Tt (min): Hydraulic Radius, r = a/pw (ft): Average Velocity, V (ft/s): Cross Sectional Flow Area, a (ft*ft): Wetted Perimeter, pw (ft): Flow Length, L (ft): Slope of Hydraulic Grade Line, S (ft/ft): Open Channel Flow Manning's Roughness Coefficient, n: Average Velocity, V (ft/s): 6 290.48 Sheet Flow Travel Time (min): 0.1 0 Flow Length, L (ft): 50.59 59.11 Slope of Hydraulic Grade Line, S (ft/ft): 0.14 324.13 Sheet Flow Travel Time (min): 0.5 0.1 Surface Description: Unpaved Unpaved Slope of Hydraulic Grade Line, S (ft/ft): 0.04 0.16 Average Velocity, V (ft/s): 3.06 6.42 Surface Description: Unpaved Unpaved Flow Length, L (ft): 83.4 28.4 Sheet Flow Travel Time (min): 5.1 9.5 Shallow Concentrated Slope of Hydraulic Grade Line, S (ft/ft): 0.04 0.03 2-yr, 24-hr Rainfall Depth, P2 (in): 3.36 3.36 Manning's Roughness Coefficient, n: 0.24 0.24 Flow Length, L (ft): 39.4 78.12 Sheet Flow Travel Time (min): 6.9 5.5 Surface Description: Dense grasses Dense grasses 2-yr, 24-hr Rainfall Depth, P2 (in): 3.36 3.36 Manning's Roughness Coefficient, n: 0.24 0.24 Flow Length, L (ft): 53.23 46.6 DESIGNED BY: CHECKED BY: Sheet Flow Surface Description: Dense grasses Dense grasses Slope of Hydraulic Grade Line, S (ft/ft): 0.03 0.04
Page 124
PROJECT: SIMSBURY RD OVER WEST BRANCH SALMON BROOK DATE: 10/09/25 EAR PROJECT NO.: 55-145 TOWN: Granby, CT DATE: 10/13/25 SG ROUTE: Simsbury Road LOCATION: STA 18+17.00, 22.00' RT Time of Concentration - L-EW-STA 18+16.00, 20.00' RT TOTALS (min) + 12.4 + 14.6 + 0.6 + 0.2 + 0 27.8 SAY: 28 DESIGNED BY: CHECKED BY: Sheet Flow Surface Description: Dense grasses Dense grasses Slope of Hydraulic Grade Line, S (ft/ft): 0.03 0.04 2-yr, 24-hr Rainfall Depth, P2 (in): 3.36 3.36 Manning's Roughness Coefficient, n: 0.24 0.24 Flow Length, L (ft): 53.23 46.6 Manning's Roughness Coefficient, n: 0.24 0.24 Flow Length, L (ft): 39.4 78.12 Sheet Flow Travel Time (min): 6.9 5.5 Surface Description: Dense grasses Dense grasses Sheet Flow Travel Time (min): 5.1 9.5 Shallow Concentrated Slope of Hydraulic Grade Line, S (ft/ft): 0.04 0.03 2-yr, 24-hr Rainfall Depth, P2 (in): 3.36 3.36 Slope of Hydraulic Grade Line, S (ft/ft): 0.04 0.18 Average Velocity, V (ft/s): 3.06 6.9 Surface Description: Unpaved Unpaved Flow Length, L (ft): 83.4 52 Flow Length, L (ft): 38 40.77 Slope of Hydraulic Grade Line, S (ft/ft): 0.09 0.12 Sheet Flow Travel Time (min): 0.5 0.1 Surface Description: Unpaved Unpaved Open Channel Flow Manning's Roughness Coefficient, n: Average Velocity, V (ft/s): 4.9 5.65 Sheet Flow Travel Time (min): 0.1 0.1 Cross Sectional Flow Area, a (ft*ft): Wetted Perimeter, pw (ft): Flow Length, L (ft): Slope of Hydraulic Grade Line, S (ft/ft): Sheet Flow Travel Time (min): 0 0 Total Time of Concentration Path, Tt (min): Hydraulic Radius, r = a/pw (ft): Average Velocity, V (ft/s):
Page 125
PROJECT: SIMSBURY RD OVER WEST BRANCH SALMON BROOK DATE: 10/09/25 EAR PROJECT NO.: 55-145 TOWN: Granby, CT DATE: 10/10/25 SG ROUTE: Simsbury Road LOCATION: EXISTING - NORTH OF SIMSBURY ROAD AT HOLCOMBB HILL ROAD INTERSECTION Time of Concentration - Existing CB STA 16+47.00, 5.00' RT TOTALS (min) + 12.8 + 8.4 + 6.1 + 0.4 + 0.6 + 0 28.3 SAY: 29 Sheet Flow Travel Time (min): 0 0 Total Time of Concentration Path, Tt (min): Hydraulic Radius, r = a/pw (ft): Average Velocity, V (ft/s): Cross Sectional Flow Area, a (ft*ft): Wetted Perimeter, pw (ft): Flow Length, L (ft): Slope of Hydraulic Grade Line, S (ft/ft): Open Channel Flow Manning's Roughness Coefficient, n: Average Velocity, V (ft/s): 4.33 2.71 Sheet Flow Travel Time (min): 0.4 0.2 Flow Length, L (ft): 115 30.22 Slope of Hydraulic Grade Line, S (ft/ft): 0.07 0.03 Sheet Flow Travel Time (min): 0.1 0.3 Surface Description: Unpaved Unpaved Slope of Hydraulic Grade Line, S (ft/ft): 0.05 0.15 Average Velocity, V (ft/s): 3.68 6.2 Surface Description: Unpaved Unpaved Flow Length, L (ft): 11.72 109 Sheet Flow Travel Time (min): 0.5 7.9 Shallow Concentrated Slope of Hydraulic Grade Line, S (ft/ft): 0.05 0.03 2-yr, 24-hr Rainfall Depth, P2 (in): 3.36 3.36 Surface Description: Dense grasses Manning's Roughness Coefficient, n: 0.24 Flow Length, L (ft): 52.72 Slope of Hydraulic Grade Line, S (ft/ft): 0.04 52 37.7 Manning's Roughness Coefficient, n: 0.011 0.24 Flow Length, L (ft): 55.6 59 Sheet Flow Travel Time (min): 7.1 5.7 Surface Description: Smooth asphalt Dense grasses 2-yr, 24-hr Rainfall Depth, P2 (in): 3.36 Sheet Flow Travel Time (min): 6.1 0 DESIGNED BY: CHECKED BY: Sheet Flow Surface Description: Dense grasses Dense grasses Slope of Hydraulic Grade Line, S (ft/ft): 0.03 0.03 2-yr, 24-hr Rainfall Depth, P2 (in): 3.36 3.36 Manning's Roughness Coefficient, n: 0.24 0.24 Flow Length, L (ft):
Page 126
PROJECT: SIMSBURY RD OVER WEST BRANCH SALMON BROOK DATE: 10/09/25 EAR PROJECT NO.: 55-145 TOWN: Granby, CT DATE: 10/13/25 SG ROUTE: Simsbury Road LOCATION: HOLCOMB HILL ROAD EAST Time of Concentration - eCB- eCB-STA 16+10.00, 44.00' RT TOTALS (min) + 8.6 + 3.9 + 0.5 + 0 + 0 13.0 SAY: 13 Sheet Flow Travel Time (min): 0 0 Total Time of Concentration Path, Tt (min): Hydraulic Radius, r = a/pw (ft): Average Velocity, V (ft/s): Cross Sectional Flow Area, a (ft*ft): Wetted Perimeter, pw (ft): Flow Length, L (ft): Slope of Hydraulic Grade Line, S (ft/ft): Open Channel Flow Manning's Roughness Coefficient, n: Average Velocity, V (ft/s): Sheet Flow Travel Time (min): 0 0 Flow Length, L (ft): Slope of Hydraulic Grade Line, S (ft/ft): Sheet Flow Travel Time (min): 0.1 0.4 Surface Description: Slope of Hydraulic Grade Line, S (ft/ft): 0.04 0.034367816 Average Velocity, V (ft/s): 3.23 3.77 Surface Description: Unpaved Paved Flow Length, L (ft): 25 87 Sheet Flow Travel Time (min): 3.9 0 Shallow Concentrated Slope of Hydraulic Grade Line, S (ft/ft): 0.036724201 2-yr, 24-hr Rainfall Depth, P2 (in): 3.36 Manning's Roughness Coefficient, n: 0.24 Flow Length, L (ft): 27.23 Sheet Flow Travel Time (min): 2.8 5.8 Surface Description: Dense grasses 2-yr, 24-hr Rainfall Depth, P2 (in): 3.36 3.36 Manning's Roughness Coefficient, n: 0.24 0.24 Flow Length, L (ft): 18.66 38.14 DESIGNED BY: CHECKED BY: Sheet Flow Surface Description: Dense grasses Dense grasses Slope of Hydraulic Grade Line, S (ft/ft): 0.04 0.026219192
Page 127
FlexTable: CTDOT Catchment Table Catchment Rational Flow (cfs) Time of Concentration (hours) Catchment CA (acres) Area (Unified) (acres) Runoff Coefficient (Rational) Outflow ElementLabelID 0.200.0830.0260.0280.950FE-STA 12+14.00, 15.00' RTC - FE-STA 12+14.00, 15.00' RT475 0.770.0830.1020.1080.950FE-STA 12+71.00, 15.00' LTC - FE-STA 12+71.00, 15.00' LT476 0.340.0830.0460.0700.654eCB-STA 15+85.00, 37.00' RTC - eCB-STA 15+85.00, 37.00' RT480 1.130.4500.3640.9190.396CB-C-L-STA 16+31.00, 21.00 RTC - C-L-CB-STA 16+31.00, 21.00' RT491 1.720.4670.5691.7050.334L - EW- STA 18+16.00, 20.00' RTC - L - EW- STA 18+16.00, 20.00' RT492 0.380.2170.0820.2720.303eCB-STA 16+10.00, 44.00' RTC - eCB-STA 16+10.00, 44.00' RT495 0.080.0830.0100.0110.950CB-STA 16+36.00, 15.00' RTC-CB-STA 16+36.00, 15.00' RT496 Page 1 of 110/16/2025 C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw 10 yr
Page 128
FlexTable: CTDOT Catchment Table Catchment Rational Flow (cfs) Time of Concentration (hours) Catchment CA (acres) Area (Unified) (acres) Runoff Coefficient (Rational) Outflow ElementLabelID 0.240.0830.0260.0280.950FE-STA 12+14.00, 15.00' RTC - FE-STA 12+14.00, 15.00' RT475 0.920.0830.1020.1080.950FE-STA 12+71.00, 15.00' LTC - FE-STA 12+71.00, 15.00' LT476 0.410.0830.0460.0700.654eCB-STA 15+85.00, 37.00' RTC - eCB-STA 15+85.00, 37.00' RT480 1.370.4500.3640.9190.396CB-C-L-STA 16+31.00, 21.00 RTC - C-L-CB-STA 16+31.00, 21.00' RT491 2.070.4670.5691.7050.334L - EW- STA 18+16.00, 20.00' RTC - L - EW- STA 18+16.00, 20.00' RT492 0.460.2170.0820.2720.303eCB-STA 16+10.00, 44.00' RTC - eCB-STA 16+10.00, 44.00' RT495 0.090.0830.0100.0110.950CB-STA 16+36.00, 15.00' RTC-CB-STA 16+36.00, 15.00' RT496 Page 1 of 110/16/2025 C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw 25 yr
Page 129
APPENDIX EGUTTER FLOW ANALYSIS
Page 130
PROJECT: SIMSBURY RD OVER WEST BRANCH SALMON BROOK DESIGNED BY: EAR DATE: 10/09/25 PROJECT NO.: 0055-0145 TOWN: Granby, CT CHECKED BY: SDG DATE: 10/13/25 ROUTE: Simsbury Road LOCATION: See Below Inlet ID Inlet Station and Offset Area in Acres (A) Runoff Coeff. (C) Time to Inlet (min.) Rainfall Intensity (in/hr) CA Total CA Catchment Rational Flow (cfs) Grade of Gutter ft/ft (SL) Cross Slope Of Shoulde r ft/ft (Sx) Depth of Flow of Gutter (ft) Gutter Flow Width (ft) Allowable Spread (ft) West Bridge Curbline STA 12+71.00, 15.00 LT 0.108 0.95 5 7.421 0.102 0.102 0.770 0.031 0.028 0.120 4.343 10.00 East Bridge Curbline STA 12+14.00, 15.00 RT 0.028 0.95 5 7.421 0.026 0.026 0.200 0.023 0.026 0.075 2.843 10.00 Inlet ID Inlet Station and Offset Area in Acres (A) Runoff Coeff. (C) Time to Inlet (min.) Rainfall Intensity (in/hr) CA Total CA Catchment Rational Flow (cfs) Grade of Gutter ft/ft (SL) Cross Slope Of Shoulde r ft/ft (Sx) Depth of Flow of Gutter (ft) Gutter Flow Width (ft) Allowable Spread (ft) West Bridge Curbline STA 12+71.00, 15.00 LT 0.108 0.95 5 8.93 0.102 0.102 0.920 0.031 0.028 0.128 4.643 10.00 East Bridge Curbline STA 12+14.00, 15.00 RT 0.028 0.95 5 8.93 0.026 0.026 0.240 0.023 0.026 0.080 3.044 10.00 East side of Simsbury Road GUTTER FLOW ANALYSIS - 10 YR STORM West side of Simsbury Road East side of Simsbury Road GUTTER FLOW ANALYSIS - 25 YR STORM West side of Simsbury Road
Page 131
APPENDIX F OPENROADS HYDRUALIC GRADE LINE ANALYSIS
Page 132
FlexTable: CTDOT Catch Basin Table Elevation (Invert Out) (ft) Elevation (Invert in 1) (ft) Hydraulic Grade Line (In) (ft) Energy Grade Line (In) (ft) Bypassed Rational Flow (cfs) Spread / Top Width (ft) Flow (Captured) (cfs) Total Rational Flow to Inlet (cfs) Elevation (Invert) (ft) Longitudinal Slope (Inlet) (%) Road Cross Slope (%) Elevation (Rim) (ft) Elevation (Ground) (ft) Clogging Factor (%) Inlet LocationInletLabel 308.00(N/A)308.44308.440.001.4440.080.08306.003.503.36311.10311.100.0On Grade"C" CB - Round - 6in Conc or Stone CurbCB-STA 16+36.00, 15.00' RT 307.83307.90308.29308.440.001.2771.131.13305.834.0020.00310.20310.200.0On Grade"C-L" CBCB-C-L-STA 16+31.00, 21.00 RT 307.13307.33307.71307.850.114.0310.270.38305.033.121.78310.83310.830.0On Grade"C" CB - Round - 6in Conc or Stone CurbeCB-STA 16+10.00, 44.00' RT 306.89307.04307.40307.560.135.0500.210.34305.292.941.19310.44310.440.0On Grade"C" CB - Round - 6in Conc or Stone CurbeCB-STA 15+85.00, 37.00' RT Page 1 of 110/16/2025 C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw 10 yr
Page 133
FlexTable: CTDOT Catch Basin Table Elevation (Invert Out) (ft) Elevation (Invert in 1) (ft) Hydraulic Grade Line (In) (ft) Energy Grade Line (In) (ft) Bypassed Rational Flow (cfs) Spread / Top Width (ft) Flow (Captured) (cfs) Total Rational Flow to Inlet (cfs) Elevation (Invert) (ft) Longitudinal Slope (Inlet) (%) Road Cross Slope (%) Elevation (Rim) (ft) Elevation (Ground) (ft) Clogging Factor (%) Inlet LocationInletLabel 308.00(N/A)308.51308.510.001.5480.090.09306.003.503.36311.10311.100.0On Grade"C" CB - Round - 6in Conc or Stone CurbCB-STA 16+36.00, 15.00' RT 307.83307.90308.33308.510.001.3711.371.37305.834.0020.00310.20310.200.0On Grade"C-L" CBCB-C-L-STA 16+31.00, 21.00 RT 307.13307.33307.77307.920.154.3220.310.46305.033.121.78310.83310.830.0On Grade"C" CB - Round - 6in Conc or Stone CurbeCB-STA 16+10.00, 44.00' RT 306.89307.04307.45307.630.175.4130.240.41305.292.941.19310.44310.440.0On Grade"C" CB - Round - 6in Conc or Stone CurbeCB-STA 15+85.00, 37.00' RT Page 1 of 110/16/2025 C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw 25 yr
Page 134
FlexTable: CTDOT Conduit Table Elevation Ground (Stop) (ft) Elevation Ground (Start) (ft) Hydraulic Grade Line (Out) (ft) Hydraulic Grade Line (In) (ft) Energy Grade Line (Out) (ft) Energy Grade Line (In) (ft) Velocity (Out) (ft/s) Velocity (In) (ft/s) Slope (%) Length (Unified) (ft) Flow (cfs) Diameter (in) Stop Invert (ft) Stop NodeStart Invert (ft) Start NodeLabel 316.50317.80314.32315.79314.92315.976.203.392.6549.0001.7218.0314.00EW-STA 17+89.00, 20.00' LT315.30L - EW- STA 18+16.00, 20.00' RTSW 310.20311.10308.44308.44308.44308.440.150.191.119.0000.0815.0307.90CB-C-L-STA 16+31.00, 21.00 RT308.00CB-STA 16+36.00, 15.00' RTSW1 310.83310.20307.79308.25307.88308.412.833.161.5233.0001.1615.0307.33eCB-STA 16+10.00, 44.00' RT307.83CB-C-L-STA 16+31.00, 21.00 RTSW4 310.44310.83307.50307.63307.61307.763.302.960.3923.0001.3415.0307.04eCB-STA 15+85.00, 37.00' RT307.13eCB-STA 16+10.00, 44.00' RTSW2 306.41310.44306.75307.34307.09307.504.693.221.4134.0001.4218.0306.41eRCCE-STA 15+53.00 43.00' RT306.89eCB-STA 15+85.00, 37.00' RTSW3 Page 1 of 110/16/2025 C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw 10 yr
Page 135
FlexTable: CTDOT Conduit Table Elevation Ground (Stop) (ft) Elevation Ground (Start) (ft) Hydraulic Grade Line (Out) (ft) Hydraulic Grade Line (In) (ft) Energy Grade Line (Out) (ft) Energy Grade Line (In) (ft) Velocity (Out) (ft/s) Velocity (In) (ft/s) Slope (%) Length (Unified) (ft) Flow (cfs) Diameter (in) Stop Invert (ft) Stop NodeStart Invert (ft) Start NodeLabel 316.50317.80314.35315.84315.02316.046.553.592.6549.0002.0718.0314.00EW-STA 17+89.00, 20.00' LT315.30L - EW- STA 18+16.00, 20.00' RTSW 310.20311.10308.51308.51308.51308.510.150.191.119.0000.0915.0307.90CB-C-L-STA 16+31.00, 21.00 RT308.00CB-STA 16+36.00, 15.00' RTSW1 310.83310.20307.87308.30307.96308.472.793.341.5233.0001.4015.0307.33eCB-STA 16+10.00, 44.00' RT307.83CB-C-L-STA 16+31.00, 21.00 RTSW4 310.44310.83307.56307.68307.68307.833.343.120.3923.0001.6115.0307.04eCB-STA 15+85.00, 37.00' RT307.13eCB-STA 16+10.00, 44.00' RTSW2 306.41310.44306.78307.38307.16307.564.943.391.4134.0001.7018.0306.41eRCCE-STA 15+53.00 43.00' RT306.89eCB-STA 15+85.00, 37.00' RTSW3 Page 1 of 110/16/2025 C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw 25 yr
Page 136
Conduit FlexTable: CTDOT Storm Drain Computation Sheet Elevation Ground (Stop) (ft) Elevation Ground (Start) (ft) Depth (Critical) (ft) Depth (Normal) (ft) Velocity (ft/s) Capacity (Full Flow) (cfs) Flow / Capacity (Design) (%) Slope (Constructi on) (%) Slope (Calculate d) (%) Invert (Stop) (ft) Invert (Start) (ft) Length (Unified) (ft) Manning's n MaterialDiam eter (in) Flow (cfs) System Rational Flow (cfs) Upstream Structure Flow (Total Surface) (cfs) System Intensity (in/h) System CA (acres) System Flow Time (min) Time (Pipe Flow) (hours) Upstre am Inlet Tc (hours) Upstream Inlet Area (acres) Stop Node Start Node Label 316.50317.800.490.326.2017.1110.02.652.65314.00315.3049.0000.013Concrete18.01.721.721.722.9930.56928.0200.0020.4671.705 EW- STA 17+89. 00, 20.00' LT L - EW- STA 18+16.0 0, 20.00' RT SW 310.20311.100.110.091.846.811.11.881.11307.90308.009.0000.013Concrete15.00.080.080.087.4210.0104.9800.0010.0830.011 CB-C-L- STA 16+31. 00, 21.00 RT CB-STA 16+36.0 0, 15.00' RT SW1 310.83310.200.420.324.637.9514.61.731.52307.33307.8333.0000.013Concrete15.01.161.161.133.0820.37427.0000.0020.4500.919 eCB- STA 16+10. 00, 44.00' RT CB-C-L- STA 16+31.0 0, 21.00 RT SW4 310.44310.830.460.502.964.0433.10.450.39307.04307.1323.0000.013Concrete15.01.341.340.383.0720.43227.1190.0020.2170.272 eCB- STA 15+85. 00, 37.00' RT eCB-STA 16+10.0 0, 44.00' RT SW2 306.41310.440.450.344.6912.4811.41.481.41306.41306.8934.0000.013Concrete18.01.421.420.343.0600.46127.2490.0020.0830.070 eRCCE- STA 15+53. 00 43.00' RT eCB-STA 15+85.0 0, 37.00' RT SW3 Page 1 of 110/16/2025 C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw 10 yr
Page 137
Conduit FlexTable: CTDOT Storm Drain Computation Sheet Elevation Ground (Stop) (ft) Elevation Ground (Start) (ft) Depth (Critical) (ft) Depth (Normal) (ft) Velocity (ft/s) Capacity (Full Flow) (cfs) Flow / Capacity (Design) (%) Slope (Constructi on) (%) Slope (Calculate d) (%) Invert (Stop) (ft) Invert (Start) (ft) Length (Unified) (ft) Manning's n MaterialDiam eter (in) Flow (cfs) System Rational Flow (cfs) Upstream Structure Flow (Total Surface) (cfs) System Intensity (in/h) System CA (acres) System Flow Time (min) Time (Pipe Flow) (hours) Upstre am Inlet Tc (hours) Upstream Inlet Area (acres) Stop Node Start Node Label 316.50317.800.540.356.5517.1112.12.652.65314.00315.3049.0000.013Concrete18.02.072.072.073.6160.56928.0200.0020.4671.705 EW- STA 17+89. 00, 20.00' LT L - EW- STA 18+16.0 0, 20.00' RT SW 310.20311.100.120.101.946.811.31.881.11307.90308.009.0000.013Concrete15.00.090.090.098.9300.0104.9800.0010.0830.011 CB-C-L- STA 16+31. 00, 21.00 RT CB-STA 16+36.0 0, 15.00' RT SW1 310.83310.200.470.364.897.9517.71.731.52307.33307.8333.0000.013Concrete15.01.401.401.373.7220.37427.0000.0020.4500.919 eCB- STA 16+10. 00, 44.00' RT CB-C-L- STA 16+31.0 0, 21.00 RT SW4 310.44310.830.500.553.104.0439.80.450.39307.04307.1323.0000.013Concrete15.01.611.610.463.7100.43027.1130.0020.2170.272 eCB- STA 15+85. 00, 37.00' RT eCB-STA 16+10.0 0, 44.00' RT SW2 306.41310.440.490.374.9412.4813.61.481.41306.41306.8934.0000.013Concrete18.01.701.700.413.6970.45727.2360.0020.0830.070 eRCCE- STA 15+53. 00 43.00' RT eCB-STA 15+85.0 0, 37.00' RT SW3 Page 1 of 110/16/2025 C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw 25 yr
Page 138
FlexTable: CTDOT Headwall Table Depth (Out) (ft) Depth (In) (ft) Energy Grade Line (Out) (ft) Hydraulic Grade Line (Out) (ft) Elevation (Invert) (ft) System Rational Flow (cfs) Flow (Total Out) (cfs) Boundary Condition Type Y (ft) X (ft) MaterialSizeInlet DescriptionLabelID 0.490.49315.97315.79315.301.721.72Free Outfall904,176.31977,066.95<None><None>Concrete - Square edge w/headwall L - EW- STA 18+16.00, 20.00' RT459 0.320.32314.32314.32314.001.711.71Free Outfall904,151.52977,024.53<None><None>0° wingwall flaresEW-STA 17+89.00, 20.00' LT461 2.842.84306.75306.75303.911.421.42Free Outfall903,922.59977,108.50<None><None>0° wingwall flareseRCCE-STA 15+53.00 43.00' RT466 Page 1 of 110/16/2025 C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw 10 yr
Page 139
FlexTable: CTDOT Headwall Table Depth (Out) (ft) Depth (In) (ft) Energy Grade Line (Out) (ft) Hydraulic Grade Line (Out) (ft) Elevation (Invert) (ft) System Rational Flow (cfs) Flow (Total Out) (cfs) Boundary Condition Type Y (ft) X (ft) MaterialSizeInlet DescriptionLabelID 0.540.54316.04315.84315.302.072.07Free Outfall904,176.31977,066.95<None><None>Concrete - Square edge w/headwall L - EW- STA 18+16.00, 20.00' RT459 0.350.35314.35314.35314.002.072.07Free Outfall904,151.52977,024.53<None><None>0° wingwall flaresEW-STA 17+89.00, 20.00' LT461 2.872.87306.78306.78303.911.701.70Free Outfall903,922.59977,108.50<None><None>0° wingwall flareseRCCE-STA 15+53.00 43.00' RT466 Page 1 of 110/16/2025 C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw 25 yr
Page 140
Transition FlexTable: Bridge Curbline Flow Table Transition Length (ft) Hydraulic Grade Line (Out) (ft) Depth (Out) (ft) Flow (Total Out) (cfs) Flow (Total In) (cfs) System CA (acres) System Drainage Area (ft²) Elevation (Invert) (ft) Elevation (Top) (ft) Elevation (Ground) (ft) LabelID 1.000(N/A)(N/A)0.200.200.0261,205.8289.52292.80292.80FE-STA 12+14.00, 15.00' RT488 1.000(N/A)(N/A)0.770.770.1024,690.8291.42294.70294.70FE-STA 12+71.00, 15.00' LT489 Page 1 of 110/16/2025 C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw 10 yr
Page 141
Transition FlexTable: Bridge Curbline Flow Table Transition Length (ft) Hydraulic Grade Line (Out) (ft) Depth (Out) (ft) Flow (Total Out) (cfs) Flow (Total In) (cfs) System CA (acres) System Drainage Area (ft²) Elevation (Invert) (ft) Elevation (Top) (ft) Elevation (Ground) (ft) LabelID 1.000(N/A)(N/A)0.240.240.0261,205.8289.52292.80292.80FE-STA 12+14.00, 15.00' RT488 1.000(N/A)(N/A)0.920.920.1024,690.8291.42294.70294.70FE-STA 12+71.00, 15.00' LT489 Page 1 of 110/16/2025 C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw 25 yr
Page 142
Profile Report Engineering Profile - L-EW-STA 18+16.00, 20.00 RT to EW-STA 17+89.00, 20.00 LT (HW_CB_0055-0145_Drainage Model_Rev -- Default.stsw) 310.00 315.00 320.00 -0+50 0+00 0+50 Station (ft) Elevation (ft) Element ID\Label Length (Unified) (ft) Rise (Unified) (ft) Flow (cfs) Slope (Calculated) (%) Element ID\Label Elevation (Ground) (ft) Elevation (Invert) (ft) Station (ft) 462\SW 49.000 1.50 1.72 2.65 462\SW 317.80 316.50 315.30 314.00 0+00 0+49 EW-STA 17+89.00, 20.00' LT Ground: 316.50 ft Invert: 314.00 ft L - EW- STA 18+16.00, 20.00' RT Ground: 317.80 ft Invert: 315.30 ft SW 49.000 ft @ 2.65 % 18" Circle - Concrete Up Inv:315.30 ft Down Inv:314.00 ft Page 1 of 110/16/2025 C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw 10 yr
Page 143
Profile Report Engineering Profile - L-EW-STA 18+16.00, 20.00 RT to EW-STA 17+89.00, 20.00 LT (HW_CB_0055-0145_Drainage Model_Rev -- Default.stsw) 310.00 315.00 320.00 -0+50 0+00 0+50 Station (ft) Elevation (ft) Element ID\Label Length (Unified) (ft) Rise (Unified) (ft) Flow (cfs) Slope (Calculated) (%) Element ID\Label Elevation (Ground) (ft) Elevation (Invert) (ft) Station (ft) 462\SW 49.000 1.50 2.07 2.65 462\SW 317.80 316.50 315.30 314.00 0+00 0+49 EW-STA 17+89.00, 20.00' LT Ground: 316.50 ft Invert: 314.00 ft L - EW- STA 18+16.00, 20.00' RT Ground: 317.80 ft Invert: 315.30 ft SW 49.000 ft @ 2.65 % 18" Circle - C oncrete Up Inv:315.30 ft Down Inv:314.00 ft Page 1 of 110/16/2025 C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw 25 yr
Page 144
Profile Report Engineering Profile - CB-STA 16+36.00, 15.00 RT to eRCCE-STA 15+53.00, 43.00 RT (HW_CB_0055-0145_Drainage Model_Rev -- Default.stsw) 300.00 305.00 310.00 315.00 -0+50 0+00 0+50 1+00 Station (ft) Elevation (ft) Element ID\Label Length (Unified) (ft) Rise (Unified) (ft) Flow (cfs) Slope (Calculated) (%) Element ID\Label Elevation (Ground) (ft) Elevation (Invert) (ft) Station (ft) 517\SW1518\SW4 468\SW2 469\SW3 9.000 33.000 23.000 34.000 1.25 1.25 1.25 1.50 0.08 1.16 1.34 1.42 1.11 1.52 0.39 1.41 517\SW1518\SW4 468\SW2 469\SW3 311.10310.20 310.83 310.44 306.41 306.00305.83 305.03 305.29 303.91 0+000+09 0+42 0+65 0+99 SW 3 34.000 ft @ 1.41 % 18" Circle - Concrete U p Inv:306.89 ft Dow n Inv:306.41 ft SW 2 23.000 ft @ 0.39 % 15" Circle - Concrete Up Inv:307.13 ft D ow n Inv:307.04 ft SW 4 33.000 ft @ 1.52 % 15" Circle - Concrete Up Inv:307.83 ft Dow n Inv:307.33 ft SW 1 9.000 ft @ 1.11 % 15" Circle - Concrete Up Inv:308.00 ft Down Inv:307.90 ft CB-C-L-STA 16+31.00, 21.00 RT Rim: 310.20 ft Invert: 305.83 ft eCB-STA 15+85.00, 37.00' RT Rim: 310.44 ft Invert: 305.29 ft eCB-STA 16+10.00, 44.00' RT Rim: 310.83 ft Invert: 305.03 ft CB-STA 16+36.00, 15.00' RT Rim: 311.10 ft Invert: 306.00 ft eRCCE-STA 15+53.00 43.00' RT Invert: 303.91 ft Page 1 of 110/16/2025 C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw 10 yr
Page 145
Profile Report Engineering Profile - CB-STA 16+36.00, 15.00 RT to eRCCE-STA 15+53.00, 43.00 RT (HW_CB_0055-0145_Drainage Model_Rev -- Default.stsw) 300.00 305.00 310.00 315.00 -0+50 0+00 0+50 1+00 Station (ft) Elevation (ft) Element ID\Label Length (Unified) (ft) Rise (Unified) (ft) Flow (cfs) Slope (Calculated) (%) Element ID\Label Elevation (Ground) (ft) Elevation (Invert) (ft) Station (ft) 517\SW1518\SW4 468\SW2 469\SW3 9.000 33.000 23.000 34.000 1.25 1.25 1.25 1.50 0.09 1.40 1.61 1.70 1.11 1.52 0.39 1.41 517\SW1518\SW4 468\SW2 469\SW3 311.10310.20 310.83 310.44 306.41 306.00305.83 305.03 305.29 303.91 0+000+09 0+42 0+65 0+99 SW 3 34.000 ft @ 1.41 % 18" Circle - Concrete U p Inv:306.89 ft Down Inv:306.41 ft SW 2 23.000 ft @ 0.39 % 15" Circle - Concrete Up Inv:307.13 ft Dow n Inv:307.04 ft SW 4 33.000 ft @ 1.52 % 15" Circle - Concrete Up Inv:307.83 ft Dow n Inv:307.33 ft SW 1 9.000 ft @ 1.11 % 15" Circle - C oncrete Up Inv:308.00 ft Down Inv:307.90 ft CB-C-L-STA 16+31.00, 21.00 RT Rim: 310.20 ft Invert: 305.83 ft eCB-STA 15+85.00, 37.00' RT Rim: 310.44 ft Invert: 305.29 ft eCB-STA 16+10.00, 44.00' RT Rim: 310.83 ft Invert: 305.03 ft CB-STA 16+36.00, 15.00' RT Rim: 311.10 ft Invert: 306.00 ft eRCCE-STA 15+53.00 43.00' RT Invert: 303.91 ft Page 1 of 110/16/2025 C:\Users\ricee\AppData\Local\Temp\Bentley\SUDAHW_CB_0055-0145_Drainage Model_Rev -- Default.stswHW_CB_0055-0145_Drainage Model_Rev -- Default.stsw 25 yr
Page 146
APPENDIX G CTDOT MS4 FORM
Page 147
Worksheet users should refer to the current CT DOT MS4 Project Design MEP Worksheet V4 Instructions
Reference the CT DEEP Stormwater Quality Manual (SWQM) for design and the New England Stormwater Retrofit Manual for Crediting
CTDOT MS4 Design MEP Worksheet Version 4 Revised 2/15/2024 Page 1 of 3
CTDOT MS4 Project Design
Maximum Extent Practicable (MEP) Worksheet
Section 1: Project Information
Project Number:
Title/Description:
Location:
Section 2: Existing Conditions
EC1 Total Project Area _________ acres
EC2 Pre-construction Total Impervious Area _________ acres
EC3 Pre-Construction Disconnected Impervious Area _________ acres
EC4 Pre-construction DCIA for the Project (EC2 minus EC3) acres ______% (EC4/EC1)
EC5 Soil Infiltration Potential Data Source: Existing Report / Soils Map Field Verified Good/Fair Poor Mixed
EC6 Depth to Maximum Groundwater TBD to ft below grade
EC7 Depth to Bedrock TBD to ft below grade
EC8 Aquifer Protection Area? (from PNDF) Yes No
EC9 MS4 Priority Area? (from PNDF) Yes (See Below) No
Check All That Apply Urbanized Area DCIA >11% Impaired Waterbody (See Below)
Select All Impairments That Apply
EC10 Contamination known or suspected to be present? (From Environmental Compliance) Yes No
EC11 Adjoining DOT ROW beyond project limits available for stormwater quality management _____________ acres
NOTES:
Town of Granby 2024 report documenting Granby’s efforts to comply with the conditions of the MS4
General Permit to the maximum extent practicable (MEP) is attached to this form.Page 148
Worksheet users should refer to the current CT DOT MS4 Project Design MEP Worksheet V4 Instructions Reference the CT DEEP Stormwater Quality Manual (SWQM) for design and the New England Stormwater Retrofit Manual for Crediting CTDOT MS4 Design MEP Worksheet Version 4 Revised 2/15/2024 Page 2 of 3 CTDOT MS4 Project Design Maximum Extent Practicable (MEP) Worksheet Section 3: Designed Conditions Section 3A: Document Water Quality Volume (WQV) Retained and/or Treated (ac-ft) Water Quality Volume Documentation 30% Design 60% Design 90% Design FDP DC1 WQV design goal Full ½-WQV (Full = EC4 % < 40%) ac-ft TBD ac-ft ac-ft ac-ft DC2 WQV goal retained (refer to page 3) ac-ft ac-ft ac-ft ac-ft DC3 WQV goal treated (refer to page 3) ac-ft ac-ft ac-ft ac-ft Did the Project Retain and/or Treat the Entire WQV Goal? Yes No Section 3B: Document Changes in Directly Connected Impervious Area (DCIA) Pre to Post Construction (acres) DCIA Documentation 30% Design 60% Design 90% Design FDP DC4 Post-construction Total Impervious Area ac. TBD ac. ac. ac. DC5 Post-construction DCIA before new BMPs ac. TBD ac. ac. ac. DC6 DCIA Disconnected by new BMPs (from Pg 3) ac. TBD ac. ac. ac. DC7 Final Post-construction DCIA (DC5 minus DC6) ac. TBD ac. ac. ac. DC8 Pre-construction DCIA (refer to EC4 from Pg 1) ac. ac. ac. ac. DC9 Change in DCIA from pre- to post-construction (DC7 minus DC8) Can be positive (DCIA gained) or negative (DCIA lost) ac. TBD ac. ac. ac. Date completed Completed by (initials) Reviewed by (initials) NOTES:
Page 149
* List the amount of the WQV the BMP is designed to retain or treat. ** Refer to the CT DEEP Stormwater Quality Manual (SWQM) Stormwater Manual (ct.gov) and New England Stormwater Retrofit Manual Stormwater Retrofit Manual (snepnetwork.org) to determine disconnection and pollutant removal percentages. BMPs should be designed to meet specific TP, TN and TSS pollutant reductions to the maximum extent practicable when the entire WQV cannot be retained. Pollutant Reduction Targets are: New Development TP 60%, TN 40%, TSS 90%. Redevelopment TP 50%, TN, 30% TSS 80%. (Page 48 of the SWQM) CTDOT MS4 Design MEP Worksheet Version 4 Revised 2/15/2024 Page 3 of 3 Section 4: Stormwater BMP Selection Summary Design Phase 30% 60% 90% FDP BMP Type WQV Retained* (ac-ft) WQV Treated* (ac-ft) DCIA Captured by BMP (ac) Runoff Depth from DCIA Captured by BMP (in) HSG Soil Type DCIA Disconnection Credit (%)** DCIA Disconnection Credit (ac) (TP) reduction %** (TSS) reduction %** (TN) reduction %* BMP Category TOTAL To Row DC2 To Row DC3 To Row DC6 Describe Site Constraints Limiting BMP Implementation if applicable: Other Notes:
Page 150
/0/1/2/3/4□/6/4/4/7/8/9/9□/10/7□/11/12/6/13/8 /14/15/16/17/15/18/19□/21/22/17/23/24/18□/25/26/27/28/26/26/29 /30 /31 □ /33/34/35/36□/38/39□/36/40/41□/42/43/44/45□/44/46/47□/48/35/38/49/35/34/50□/39/51/52/53/41/53□/54/55□/56/57□/58/43/43/33 /59/60/60□/28/61/27/62/63/29□/28/26/29/26/28/64/26/65 /66/67/68/69/70/71/72 /73/74/75/76/77/78□/80/81□/82/83/84□/77/85/76/77/86/76 /87/88/88/89□/91/88 /92/93/94/95/96□/97/94/93/94/98/91/99/88/100 /101/102/103/104/102/72/105 /106/68/70/104/107/108/109/68/102/104□/111/70/112/112/113/68/109/71/68 /70/103□/114/70/71/115/102/104/71 /116/107/67/109/69/104/107/102/71/68□/117/118/67/102 /114/109/113/72/102 /116/107/67/109/69/104/102/119□/120/102/72/69/121/71/109/68/102/119 /122/72/102 /123/111/124□/114/109/68/102/121/70/104/118 /117/125/120/126 /117/125/120/126/127/126/69/71/128 /129/109/68/102/104/130/70/119/118□/106/102/121/107/102/71/68 /116/120 /120/102/72/115/104/69/67/68/69/70/71 /129/109/68/102/104/130/70/119/118□/131/109/107/102 /125/69/112/102/72 /132/122/114□/133 /134/109/115/68/102/104/69/109 /117/125/120/126□/116/107/67/109/69/104/102/119 /123/72/115/105/102/104/69/115/105/69/109□/115/70/112/69 /101/102/115/104/102/109/68/69/70/71 /135/109 /114/117 □/106/68/109/68/102/108/69/119/102□/134/109/115/68/102/104/69/109 /117/125/120/126 /136/137/137/138/139/140/141/141/138/142/143/137/144/145/146/147/137/146/148/142/149/141/150/141 /151 /114/117/135/152/153/154/155/156/156/127/156/153/130 /114/70/71/103/112/113/102/71/115/102□/134/69/72/72/102/112/112 /134/104/70/70/128□/122/106□/70/103□/101/70/113/68/102 /153/156/157/158/156/158□/115/104/70/72/72/69/71/121/159□/122/106□/68/70 /132/129□/160/113/72/68□/122/106□/101/70/113/68/102□/153/161/154 /162/106/70/113/68/105□/101/70/109/119/163□/115/104/70/72/72/69/71/121/159 /132/109/104/68/112/109/71/119/164 /129/102/72/68□/134/104/109/71/115/105□/106/109/112/107/70/71 /134/104/70/70/128/127/156/153/130 /153/153/164/158/154 /156/153/156/133/156/158/156/161 /153□/103/102/109/68/113/104/102/72□/156□/72/102/112/102/115/68/102/119□ /158/156/158/156□/114/117□/106/68/70/104/107/108/109/68/102/104□/116/107/67/109/69/104/102/119□/101/69/166/102/104/72 /167/168/167/168□/170/171□/172/173/174/175/176/177/178/173/179/175□/180/176/181/178/182/175/179/183□/184/178/185/179/186 /167/168/167/168□/170/171□/172/173/174/175/176/177/178/173/179/175□/180/176/181/178/182/175/179/183□/187/186/173/188/178/175/182/179/186 /170/171□/189/172/190□/171/174/177/191/186 /192/22□/193/194□/16/195 /196/197/196/197□/199/200/201/202/203/204/205/200/206/202□/207/203/208/205/209/202/206/210□/211/209/212/206/202/213□/214/206/215/200 /216/202/205/217/218/219□/199/205/220/203/201/217□/216/202/201/201/221/222/197/223/224 /225/91/88/96/89/226/95/91/94/96 /227/88/93/93/228/91/95/100/91□/88/229 /92/88/100/98/94/96/100 /230/95/98/91/94/96/99/95 /231/89/232/95/99/96/89/94/100/91 /233/234/232/94 /233/235/236/237□/231/89/232/95/99/96/94/238 /92/95/228/97/94 /239/97/98/240/94/96/99/98/240/99/95□/98/88/93/99 /231/89/232/95/99/96/94/238 /236/94/97/99/241/100/95/91/94/238 /242/97/94 /243/94/98/96/94/95/91/99/88/100 /239/227/244□/92/95/91/94/241/88/96/234 /245/95 /233/235/236/237 /92/233□/225/91/95/91/94/226/99/238/94□/230/95/98/91/94/96/99/95□/233/235/236/237 /233/235/236/237/246/237/99/100/247 /248/142/143/249□/251/252/253/142 /254/95/91/94/96/255/88/238/234□/231/236 /92/233/245 /0/1/2/3/4/4 /246/4/1 /255 /236/94/97/98/96/99/232/91/99/88/100 /92/88/100/229/93/228/94/100/98/94□/230/99/97/97/94/93/93□/230/96/88/88/247□/242/225 /88 /229□/243 /88/228/91/94 □/1/4/5 /6/4/6□/98/96/88/97/97/99/100/241 /7 /8/142/142/151□/137/142 /9/10/11/9/12/11/13/14/15□/9/13/17/14/18□/19/20 □/21/22/23/23/24/25/26/27/25/28/26□/20/29/12□/30/22/31/23/32□/33/23/34□/35/33/26/33 /36/26/26 /37/32/17/11/11/31/31/31/38/33/39/25 /40/27/32/38/25/22/41/11/33 /37/37 /32/11/31/24/42/33 /37/37 /43/27/24/31/24/39/11/27/23/34/24/44/38/36/26/41/45/46/27/34/47/34/25/42/25/14/42/48/48/10/24/18/49/12/25/33/42/42/33/18/10/50/33/34/24/25/13/13/49/18/18 /51/42/52□/35/33/26/33□/53 /37/37 /47 /9/11/9
Page 151
Impaired Segment Facts Impaired Segments: 1. West Branch Salmon Brook (Segment 1a) (CT4319-00_01a) 2. West Branch Salmon Brook (Segment 1b) (CT4319-00_01b) Municipalities: Hartland, Granby Impaired Segment Length (miles): 4319-00_01a (1.4), 4319-00_01b (11.29) Water Quality Classification: Class A Designated Use Impairment: Recreation Sub-regional Basin Name and Code: West Branch Salmon Brook, 4319 Regional Basin: Farmington Major Basin: Connecticut Watershed Area (acres): 17,019 MS4 Applicable? Yes Applicable Season: Recreation Season (May 1 to September 30) Figure 1: Watershed location in Connecticut WATERSHED DESCRIPTION AND MAPS The West Branch Salmon Brook watershed covers an area of approximately 17,019 acres in the mid-northern half of Connecticut, west of the Connecticut River (Figure 1). The watershed is located in Hartland, Simsbury, Barkhamsted, and Granby, CT. The West Branch Salmon Brook watershed includes two segments impaired for recreation due to elevated bacteria levels. These segments were assessed by Connecticut Department of Energy and Environmental Protection (CT DEEP) and included in the CT 2010 303(d) List of Impaired Waters. An excerpt of the Integrated Water Quality Report is included in Table 1 to show the status of other waterbodies in the watershed (CTDEEP, 2010). West Branch Salmon Brook begins upstream of the Route 179 crossing in Hartland, heads east following Route 20 (Hartland Road), turns south following Simsbury Road, crosses Barndoor Hills Road, turns north following Barndoor Hills Road, turns east to cross Route 202 (10), and ends at the confluence with East Branch Salmon Brook in Granby. The bacteria impaired segment, West Branch Salmon Brook (Segment 1a) (CT4319-00_01a), consists of 1.4 miles of river in Granby (Figure 2). West Branch Salmon Brook (Segment 1a) begins at the confluence with Bissell Brook just upstream of the Route 202 (10) crossing, and ends at the confluence with East Branch Salmon Brook to the west of Route 189 in Granby. The bacteria impaired segment, West Branch Salmon Brook (Segment 1b) (CT4319-00_01b), consists of 11.29 miles of the river in Hartland, and Granby (Figure 2). West Branch Salmon Brook (Segment 1b) begins upstream of the Route 179 crossing in Hartland, heads east following Route 20, turns south following Simsbury Road, crosses Barndoor Hills Roads, turns north following Barndoor Hills Road, and ends at the confluence with Bissell Brook just upstream of the Route 202 (10) crossing in Granby. The two impaired segments of West Branch Salmon Brook have a water quality classification of A. West Branch Salmon Brook Watershed Summary
Page 152
FINAL West Branch Salmon Brook Watershed Summary September 2012 West Branch Salmon Brook Watershed TMDL Page 2 of 26 Designated uses include potential drinking water supplies, habitat for fish and other aquatic life and wildlife, recreation, navigation, and industrial and agricultural water supply. As there are no designated beaches in these segments of West Branch Salmon Brook, the specific recreation impairment is for non- designated swimming and other water contact related activities. Table 1: Impaired segments and nearby waterbodies from the Connecticut 2010 Integrated Water Quality Report Waterbody ID Waterbody Name Location Miles Aquatic Life Recreation Fish Consumption CT4319- 00_01a Salmon Brook, West Branch (Granby)-01a From mouth at confluence with East Branch Salmon Brook (part of Salmon Brook mainstem), DS of Route 10/202 crossing, just to West of Route 189, Granby, US to Bissell Brook (just US of Route 10/202 crossing), Granby. 1.4 FULL NOT FULL CT4319- 00_01b Salmon Brook, West Branch (Granby)-01b From confluence with Bissell Brook (US of Route 10/202 crossing), US to headwaters (just US of Route 179 (South Road) crossing), Hartland. 11.29 FULL NOT FULL Shaded cells indicate impaired segment addressed in this TMDL FULL = Designated Use Fully Supported NOT = Designated Use Not Supported U = Unassessed
Page 153
FINAL West Branch Salmon Brook Watershed Summary September 2012 West Branch Salmon Brook Watershed TMDL Page 3 of 26 Figure 2: GIS map featuring general information of the West Branch Salmon Brook watershed at the sub-regional level
Page 154
FINAL West Branch Salmon Brook Watershed Summary September 2012 West Branch Salmon Brook Watershed TMDL Page 4 of 26 Land Use Existing land use can affect the water quality of waterbodies within a watershed (USEPA, 2011c). Natural processes, such as soil infiltration of stormwater and plant uptake of water and nutrients, can occur in undeveloped portions of the watershed. As impervious surfaces (such as rooftops, roads, and sidewalks) increase within the watershed landscape from commercial, residential, and industrial development, the amount of stormwater runoff to waterbodies also increases. These waterbodies are negatively affected as increased pollutants from nutrients and bacteria from failing and insufficient septic systems, oil and grease from automobiles, and sediment from construction activities become entrained in this runoff. Agricultural land use activities, such as fertilizer application and manure from livestock, can also increase pollutants in nearby waterbodies (USEPA, 2011c). As shown in Figures 3 and 4, the West Branch Salmon Brook watershed consists of 78% forest, 11% urban, 7% agriculture, and 4% water land uses. The headwaters begin in a forested area with sporadic hayfields and rural residential development. The stream skirts closely to Route 20 (Hartland Road) where residential development is more prominent. Greater commercial and residential development intermixed with row crops and hayfields can be found along Simsbury Road and Barndoor Hills Road. The stream flows near several identified livestock pens, a game refuge, and Salmon Brook Park, which consists of 7 soccer fields, 5 baseball fields, tennis courts, parking lots, and a recreational swimming area. Downstream of the Route 202 (10) crossing, West Branch Salmon Brook flows between major row crop fields in suburban residential and commercial development. Figure 3: Land use within the West Branch Salmon Brook watershed 7% 78% 4% 11% Land Use (%) within the West Branch Salmon Brook Watershed Agriculture Forest Urban Water
Page 155
FINAL West Branch Salmon Brook Watershed Summary September 2012 West Branch Salmon Brook Watershed TMDL Page 5 of 26 Figure 4: GIS map featuring land use for the West Branch Salmon Brook watershed at the sub- regional level
Page 156
FINAL West Branch Salmon Brook Watershed Summary September 2012 West Branch Salmon Brook Watershed TMDL Page 6 of 26 WHY IS A TMDL NEEDED? E. coli is the indicator bacteria used for comparison with the CT State criteria in the CT Water Quality Standards (WQS) (CTDEEP, 2011). All data results are from CT DEEP, USGS, Bureau of Aquaculture, or volunteer monitoring efforts at stations located on the impaired segments. Table 2: Sampling station location description for impaired segments in the West Branch Salmon Brook watershed Waterbody ID Waterbody Name Station Station Description Municipality Latitude Longitude CT4319-00_01a West Branch Salmon Brook 2455 Rte.10 Bridge, McLean Game Refuge Granby 41.941107 -72.792581 CT4319-00_01b West Branch Salmon Brook 1082 Salmon Brook Park Granby 41.943781 -72.795675 CT4319-00_01b West Branch Salmon Brook 2456 footbridge McLean Game Refuge, Barn Door Hills Road Granby 41.939272 -72.816897 The two impaired segments of West Branch Salmon Brook (Segments 1a and 1b) are Class A freshwater rivers (Figure 5). Their applicable designated uses are potential drinking water supplies, habitat for fish and other aquatic life and wildlife, recreation, navigation, and industrial and agricultural water supply. Water quality analyses were conducted using data from one sampling location on West Branch Salmon Brook (Segment 1a) (Station 2455) from 2007-2008, and from two sampling locations on West Branch Salmon Brook (Segment 1b) (Stations 1082 and 2456) from 2007-2009 (Table 2). For West Branch Salmon Brook (Segment 1a), the water quality criteria for E. coli, along with bacteria sampling results for Station 2455 from 2007-2008, are presented in Table 7. The annual geometric mean was calculated for Station 2455 and exceeded the WQS for E. coli in both sampling years. Single sample values at this station also exceeded the WQS for E. coli in 2007 and 2008 on at least one sampling date. For West Branch Salmon Brook (Segment 1b), the water quality criteria for E. coli, along with bacteria sampling results for Stations 1082 and 2456 from 2007-2009 are presented in Table 8. The annual geometric mean was calculated and exceeded the WQS for E. coli in 2008. Single sample values at Station 1082 also exceeded the WQS for E. coli in 2008 and 2009 on at least one sampling date. To aid in identifying possible bacteria sources, the geometric mean was also calculated for each station for wet-weather and dry-weather sampling days, where possible (Tables 7-8). For West Branch Salmon Brook (Segment 1a), geometric mean values during both wet and dry-weather at Station 2455 exceeded the WQS for E coli, and wet weather values were higher than dry weather. For West Branch Salmon Brook (Segment 1b), at Station 1082 only the geometric mean during wet-weather exceeded the WQS for E. coli and was four times higher than in dry weather; while at station 2456 there was no wet weather data, so comparison was not possible. Due to the elevated bacteria measurements presented in Tables 7-8, these segments of West Branch Salmon Brook did not meet CT’s bacteria WQS, were identified as impaired, and were placed on the CT List of Waterbodies Not Meeting Water Quality Standards, also known as the CT 303(d) Impaired Waters List. The Clean Water Act requires that all 303(d) listed waters undergo a TMDL assessment that
Page 157
FINAL West Branch Salmon Brook Watershed Summary September 2012 West Branch Salmon Brook Watershed TMDL Page 7 of 26 describes the impairments and identifies the measures needed to restore water quality. The goal is for all waterbodies to comply with State WQS. Figure 5: Aerial map of West Branch Salmon Brook
Page 158
FINAL West Branch Salmon Brook Watershed Summary September 2012 West Branch Salmon Brook Watershed TMDL Page 8 of 26 POTENTIAL BACTERIA SOURCES Potential sources of indicator bacteria in a watershed include point and non-point sources, such as stormwater runoff, agriculture, sanitary sewer overflows (collection system failures), illicit discharges, and inappropriate discharges to the waterbody. Potential sources that have been tentatively identified in the watershed based on land use (Figures 3 and 4) and a collection of local information for the impaired waterbody is presented in Table 3 and Figure 6. However, the list of potential sources is general in nature and should not be considered comprehensive. There may be other sources not listed here that contribute to the observed water quality impairment in the study segments. Further monitoring and investigation will confirm listed sources and discover additional ones. Some segments in this watershed may be listed as unassessed by CT DEEP procedures. This does not suggest that there are no potential issues on this segment, but indicates a lack of current data to evaluate the segment as part of the assessment process. For some segments, there are data from permitted sources, and CT DEEP recommends that any elevated concentrations found from those permitted sources be addressed through voluntary reduction measures. More detailed evaluation of potential sources is expected to become available as activities are conducted to implement these TMDLs. Table 3: Potential bacteria sources in the West Branch Salmon Brook watershed Impaired Segment Permit Source Illicit Discharge CSO/SSO Issue Failing Septic System Agricultural Activity Stormwater Runoff Nuisance Wildlife/Pets Other West Branch Salmon Brook CT4319- 00_01a x x x x West Branch Salmon Brook CT4319- 00_01b x x x x
Page 159
FINAL West Branch Salmon Brook Watershed Summary September 2012 West Branch Salmon Brook Watershed TMDL Page 9 of 26 Figure 6: Potential sources in the West Branch Salmon Brook watershed at the sub-regional level
Page 160
FINAL West Branch Salmon Brook Watershed Summary September 2012 West Branch Salmon Brook Watershed TMDL Page 10 of 26 Point Sources Permitted sources within the watershed that could potentially contribute to the bacteria loading are identified in Table 4. This table includes permit types that may or may not be present in the impaired watershed. Future investigation and monitoring may reveal the presence of discharges in the watershed. Available effluent data from each of these permitted categories found within the watershed are compared to the CT State WQS for the appropriate receiving waterbody use and type. Table 4: General categories list of other permitted discharges Permit Code Permit Description Type Number in watershed CT Surface Water Discharges 0 GPL Discharge of Swimming Pool Wastewater 0 GSC Stormwater Discharge Associated with Commercial Activity 0 GSI Stormwater Associated with Industrial Activity 0 GSM Part B Municipal Stormwater MS4 0 GSN Stormwater Registration – Construction 0 LF Groundwater Permit (Landfill) 0 UI Underground Injection 0 Permitted Sources There is currently no permitted discharge information available for the West Branch Salmon Brook watershed. Since the MS4 permits are not targeted to a specific location, but the geographic area of the regulated municipality, there is no one accurate location on the map to display the location of these permits. One dot will be displayed at the geographic center of the municipality as a reference point. Sometimes this location falls outside of the targeted watershed and therefore the MS4 permit will not be displayed in the Potential Sources Map. Using the municipal border as a guideline will show which areas of an affected watershed are covered by an MS4 permit. Municipal Stormwater Permitted Sources Per the EPA Phase II Stormwater rule all municipal storm sewer systems (MS4s) operators located within US Census Bureau Urbanized Areas (UAs) must be covered under MS4 permits regulated by the appropriate State agency. There is an EPA waiver process that municipalities can apply for to not participate in the MS4 program. In Connecticut, EPA has granted such waivers to 19 municipalities. All The potential sources map for the impaired basin was developed after thorough analysis of available data sets. If information is not displayed in the map, then no sources were discovered during the analysis. The following is the list of potential sources that were evaluated: problems with migratory waterfowl, golf course locations, reservoirs, proposed and existing sewer service, cattle farms, poultry farms, permitted sources of bacteria loading (surface water discharge, MS4 permit, industrial stormwater, commercial stormwater, groundwater permits, and construction related stormwater), and leachate and discharge sources (agricultural waste, CSOs, failing septic systems, landfills, large septic tank leach fields, septage lagoons, sewage treatment plants, and water treatment or filter backwash).
Page 161
FINAL West Branch Salmon Brook Watershed Summary September 2012 West Branch Salmon Brook Watershed TMDL Page 11 of 26 participating municipalities within UAs in Connecticut are currently regulated under MS4 permits by CT DEEP staff in the MS4 program. The US Census Bureau defines a UA as a densely settled area that has a census population of at least 50,000. A UA generally consists of a geographic core of block groups or blocks that exceeds the 50,000 people threshold and has a population density of at least 1,000 people per square mile. The UA will also include adjacent block groups and blocks with at least 500 people per square mile. A UA consists of all or part of one or more incorporated places and/or census designated places, and may include additional territory outside of any place. (67 FR 11663) For the 2000 Census a new geographic entity was created to supplement the UA blocks of land. This created a block known as an Urban Cluster (UC) and is slightly different than the UA. The definition of a UC is a densely settled area that has a census population of 2,500 to 49,999. A UC generally consists of a geographic core of block groups or blocks that have a population density of at least 1,000 people per square mile, and adjacent block groups and blocks with at least 500 people per square mile. A UC consists of all or part of one or more incorporated places and/or census designated places; such a place(s) together with adjacent territory; or territory outside of any place. The major difference is the total population cap of 49,999 people for a UC compared to >50,000 people for a UA. (67 FR 11663) While it is possible that CT DEEP will be expanding the reach of the MS4 program to include UC municipalities in the near future they are not currently under the permit. However, the GIS layers used to create the MS4 maps in this Statewide TMDL did include both UA and UC blocks. This factor creates some municipalities that appear to be within an MS4 program that are not currently regulated through an MS4 permit. This oversight can explain a municipality that is at least partially shaded grey in the maps and there are no active MS4 reporting materials or information included in the appropriate appendix. While these areas are not technically in the MS4 permit program, they are still considered urban by the cluster definition above and are likely to contribute similar stormwater discharges to affected waterbodies covered in this TMDL. As previously noted, EPA can grant a waiver to a municipality to preclude their inclusion in the MS4 permit program. One reason a waiver could be granted is a municipality with a total population less than 1000 people, even if the municipality was located in a UA. There are 19 municipalities in Connecticut that have received waivers, this list is: Andover, Bozrah, Canterbury, Coventry, East Hampton, Franklin, Haddam, Killingworth, Litchfield, Lyme, New Hartford, Plainfield, Preston, Salem, Sherman, Sprague, Stafford, Washington, and Woodstock. There will be no MS4 reporting documents from these towns even if they are displayed in an MS4 area in the maps of this document. The list of US Census UCs is defined by geographic regions and is named for those regions, not necessarily by following municipal borders. In Connecticut the list of UCs includes blocks in the following Census Bureau regions: Colchester, Danielson, Lake Pocotopaug, Plainfield, Stafford, Storrs, Torrington, Willimantic, Winsted, and the border area with Westerly, RI (67 FR 11663). Any MS4 maps showing these municipalities may show grey areas that are not currently regulated by the CT DEEP MS4 permit program. Segment 1a of West Branch Salmon Brook is located within the Town of Granby, CT. Portions of the town particularly around Segment 1a are urbanized, as defined by the U.S. Census Bureau, and Granby is required to comply with the MS4 General Permit CT DEEP (Figure 7). This general permit is only applicable to municipalities that are identified in Appendix A of the MS4 permit that contain designated urban areas and discharge stormwater via a separate storm sewer system to surface waters of the State.
Page 162
FINAL West Branch Salmon Brook Watershed Summary September 2012 West Branch Salmon Brook Watershed TMDL Page 12 of 26 The permit requires municipalities to develop a Stormwater Management Plan (SMP) to reduce the discharge of pollutants and protect water quality. The MS4 permit is discussed further in the “TMDL Implementation Guidance” section of the core TMDL document. Additional information regarding stormwater management and the MS4 permit can be obtained on CTDEEP’s website (http://www.ct.gov/dep/cwp/view.asp?a=2721&q=325702&depNav_GID=1654). One MS4 outfall has been sampled for E. coli bacteria in the watershed (Table 5). This outfall, located in Granby, was sampled from 2007-2009, and exceeded the single sample water quality standard of 410 colonies/100 mL in 2008. Table 5: List of MS4 sample locations and E. coli (colonies/100 mL) results in the West Branch Salmon Brook watershed Town Location MS4 Type Receiving Waters Sample Date Result Granby Mill Pond C-2 Commercial Salmon Brook 10/19/07 50 Granby Mill Pond C-2 Commercial Salmon Brook 09/26/08 5,080 Granby Mill Pond C-2 Commercial Salmon Brook 11/14/09 50 Shaded cells indicate an exceedance of single-sample based water quality criteria (410 colonies/100 mL)
Page 163
FINAL West Branch Salmon Brook Watershed Summary September 2012 West Branch Salmon Brook Watershed TMDL Page 13 of 26 Figure 7: MS4 areas of the West Branch Salmon Brook watershed
Page 164
FINAL West Branch Salmon Brook Watershed Summary September 2012 West Branch Salmon Brook Watershed TMDL Page 14 of 26 Non-point Sources Non-point source pollution (NPS) comes from many diffuse sources and is more difficult to identify and control. NPS pollution is often associated with land-use practices. Examples of NPS that can contribute bacteria to surface waters include insufficient septic systems, pet and wildlife waste, agriculture, and contact recreation (swimming or wading). Potential sources of NPS within the West Branch Salmon Brook watershed are described below. Agricultural Activities Agricultural operations are an important economic activity and landscape feature in many areas of the State. Runoff from agricultural fields may contain pollutants such as bacteria and nutrients (USEPA, 2011a). This runoff can include pollutants from farm practices such as storing manure, allowing livestock to wade in nearby waterbodies, applying fertilizer, and reducing the width of vegetated buffer along the shoreline. Agricultural land use makes up 7% of the West Branch Salmon Brook watershed, and the impaired segments of the West Branch Salmon Brook watershed flow through several agricultural corridors consisting of hayfields, row crops, and potential livestock pens, particularly along Simsbury Road, Barndoor Hills Road, and downstream of the Route 202 (10) crossing. Wildlife and Domestic Animal Waste Wildlife and domestic animals within the West Branch Salmon Brook watershed represent another potential source of bacteria. Wildlife, including waterfowl, may be a significant bacteria source to surface waters. With the construction of roads and drainage systems, these wastes may no longer be retained on the landscape, but instead may be conveyed via stormwater to the nearest surface water. These physical land alterations can exacerbate the impact of these natural sources on water quality (USEPA, 2001). The majority of the West Branch Salmon Brook watershed is undeveloped and wildlife waste may be a potential source of bacteria. The impaired segments of West Branch Salmon Brook run through residential development along Route 20 and near the Route 202 (10) crossing, so pet waste may also be a potential source of bacteria. The impaired segments of West Branch Salmon Brook flow adjacent to agricultural fields, McLean Game Refuge, and Salmon Brook Park, which consists of 7 soccer fields, 5 baseball fields, tennis courts, parking lots, and a recreational swimming area. Geese and other waterfowl are known to congregate in open areas including recreational fields, agricultural crop fields, and golf courses. In addition to creating a nuisance, large numbers of geese can create unsanitary conditions on the grassed areas and cause water quality problems due to bacterial contamination associated with their droppings. Large populations of geese can also lead to habitat destruction as a result of overgrazing on wetland and riparian plants. Stormwater Runoff from Developed Areas While the majority of the West Branch Salmon Brook watershed is forested (78%), approximately 11% of the land use in the watershed is urban, and the impaired segments of West Branch Salmon Brook flow near Route 20 and Route 202 (10), which are characterized by suburban residential and agricultural development (Figures 4 and 9). Urban areas are often characterized by impervious cover, or surface areas such as roofs and roads that force water to run off land surfaces rather than infiltrate into the soil. Studies have shown a link between increasing impervious cover and degrading water quality conditions in a watershed (CWP, 2003). In one study, researchers correlated the amount of fecal coliform to the percent of impervious cover in a watershed (Mallin et al., 2000).
Page 165
FINAL West Branch Salmon Brook Watershed Summary September 2012 West Branch Salmon Brook Watershed TMDL Page 15 of 26 As shown in Figures 8 and 9, 98% of the West Branch Salmon Brook watershed contains less than 6% impervious cover, particularly along Segment 1b, and Segment 1a flows through an area characterized by 7-11% impervious cover. As indicated above, Segment 1b and Segment 1a flow through several urban- agriculture corridors with commercial and residential development along Route 20 and Route 202 (10); therefore, stormwater runoff pollution from adjacent urban development may be a higher contributor of bacterial contamination than the summarized statistics for land use and impervious cover reveal. Water quality data taken at Stations 2455 and 1082 along West Branch Salmon Brook exceeded wet-weather geometric mean limits, which suggests that stormwater runoff may be a source of bacteria to West Branch Salmon Brook (Tables 7-8). Figure 8: Range of impervious cover (%) in the West Branch Salmon Brook watershed 98% 2% Impervious Cover in the West Branch Salmon Brook Watershed 0 - 6% 7 - 11% 12 - 15% > 16%
Page 166
FINAL West Branch Salmon Brook Watershed Summary September 2012 West Branch Salmon Brook Watershed TMDL Page 16 of 26 Figure 9: Impervious cover (%) for the West Branch Salmon Brook sub-regional watershed
Page 167
FINAL West Branch Salmon Brook Watershed Summary September 2012 West Branch Salmon Brook Watershed TMDL Page 17 of 26 Insufficient Septic Systems and Illicit Discharges As shown in Figure 6, the entire West Branch Salmon Brook watershed relies on onsite wastewater treatment systems, such as septic systems. Insufficient or failing septic systems can be significant sources of bacteria by allowing raw waste to reach surface waters. West Branch Salmon Brook (Segment 1a) at Station 2455 exceeded the dry-weather geometric mean limit for E. coli, which may indicate nearby failing septic systems. In Connecticut, local health directors or health districts are responsible for keeping track of any reported insufficient or failing septic systems in a specific municipality. The Towns of Hartland and Granby are part of the Farmington Valley Health District (http://www.fvhd.org/). There is only a very small area near the southern border of the West Branch Salmon Brook watershed that is serviced by the municipal sewer system (Figure 6). Given the very small size of this area, and the large distance from the impaired stream segments, sewer system leaks and other illicit discharges are not considered a potential source of bacteria in the watershed. Additional Sources As identified in Figure 6, a landfill is located along a tributary to Segment 1b, but is not considered a significant source of bacterial contamination to West Branch Salmon Brook given the distance from the impaired stream. There may be other sources not listed here or identified in Figure 6 that contribute to the observed water quality impairment in West Branch Salmon Brook. Further monitoring and investigation will confirm the listed sources and discover additional ones. More detailed evaluation of potential sources is expected to become available as activities are conducted to implement this TMDL. Land Use/Landscape Riparian Buffer Zones The riparian buffer zone is the area of land located immediately adjacent to streams, lakes, or other surface waters. The boundary of the riparian zone and the adjoining uplands is gradual and not always well-defined. However, riparian zones differ from uplands because of high levels of soil moisture, frequent flooding, and the unique assemblage of plant and animal communities found there. Through the interaction of their soils, hydrology, and vegetation, natural riparian areas influence water quality as contaminants are taken up into plant tissues, adsorbed onto soil particles, or modified by soil organisms. Any change to the natural riparian buffer zone can reduce the effectiveness of the natural buffer and has the potential to contribute to water quality impairment (USEPA, 2011b). The CLEAR program at UCONN has created streamside buffer layers for the entire State of Connecticut (http://clear.uconn.edu/), which have been used in this TMDL. Analyzing this information can reveal potential sources and implementation opportunities at a localized level. The land use directly adjacent to a waterbody can have direct impacts on water quality from surface runoff sources. The riparian zone for West Branch Salmon Brook (Segment 1a) is characterized by mixed forest with agricultural and developed land uses (Figure 10). Riparian areas along West Branch Salmon Brook (Segment 1b) are characterized by mixed forest with agricultural, turf-grass, and developed land uses. As previously noted, if not properly treated, runoff from agricultural and developed areas may contain pollutants such as bacteria and nutrients.
Page 168
FINAL West Branch Salmon Brook Watershed Summary September 2012 West Branch Salmon Brook Watershed TMDL Page 18 of 26 Figure 10: Riparian buffer zone information for the West Branch Salmon Brook watershed UCONN CLEAR: http://clear.uconn.edu/
Page 169
FINAL West Branch Salmon Brook Watershed Summary September 2012 West Branch Salmon Brook Watershed TMDL Page 19 of 26 CURRENT MANAGEMENT ACTIVITIES As indicated previously, Granby is regulated under the MS4 program. The MS4 General Permit is required for any municipality with urbanized areas that initiates, creates, originates or maintains any discharge of stormwater from a storm sewer system to waters of the State. The MS4 permit requires towns to design a Stormwater Management Plan (SMP) to reduce the discharge of pollutants in stormwater to improve water quality. The plan must address the following 6 minimum measures: 1. Public Education and Outreach. 2. Public Involvement/Participation. 3. Illicit discharge detection and elimination. 4. Construction site stormwater runoff control. 5. Post-construction stormwater management in new development and redevelopment. 6. Pollution prevention/good housekeeping for municipal operations. Each town is also required to submit an annual update outlining the steps they are taking to meet the six minimum measures. All updates that address bacterial contamination in the watershed are summarized in Table 6. Table 6: Summary of MS4 requirement updates related to the reduction of bacterial contamination from Granby, CT (Permit # GSM000029) Minimum Measure Town of Granby Annual Report (2008) Public Outreach and Education 1) Modified stormwater pollution section on website. Public Involvement and Participation No updates. Illicit Discharge Detection and Elimination 1) Completed mapping of all storm sewer outfalls. 2) Will adopt illicit discharge detection and elimination ordinance. Construction Site Stormwater Runoff Control 1) Continuing to review existing regulations regarding runoff and erosion control. Post Construction Stormwater Management No updates. Pollution Prevention and Good Housekeeping 1) Developing a program to evaluate and clean stormwater structures for upgrades and necessary repairs.
Page 170
FINAL West Branch Salmon Brook Watershed Summary September 2012 West Branch Salmon Brook Watershed TMDL Page 20 of 26 RECOMMENDED NEXT STEPS The Towns of Hartland and Granby have developed and implemented programs to protect water quality from bacterial contamination. Several municipalities have worked with the Farmington River Watershed Association (FRWA) www.frwa.org to develop and implement programs to protect water quality from bacterial contamination. Any municipalities not already working with this watershed association are encouraged to contact them for assistance with future efforts dealing with bacteria impairment in the West Branch Brook Watershed, a tributary of the Farmington River. Future mitigative activities are necessary to ensure the long-term protection of West Branch Salmon Brook and have been prioritized below. 1) Ensure there are sufficient buffers on agricultural lands along West Branch Salmon Brook. Agricultural land use represents 7% of the West Branch Salmon Brook watershed, and is particularly concentrated around the impaired segments of West Branch Salmon Brook along Simsbury Road, Barndoor Hills Road, and downstream of the Route 202 (10) crossing. Potential livestock pens along West Branch Salmon Brook may be a concern for water quality. If not already in place, agricultural producers should work with the CT Department of Agriculture and the U.S. Department of Agriculture Natural Resources Conservation Service to develop conservation plans for their farming activities within the watershed. These plans should focus on ensuring that there are sufficient stream buffers, that fencing exists to restrict livestock and horse access from streams and wetlands, and that animal waste handling, disposal, and other appropriate BMPs are in place. 2) Evaluate municipal education and outreach programs regarding animal waste. As most of the West Branch Salmon Brook watershed is forested with developed residential and agricultural areas along Route 20, Simsbury Road, Barndoor Hills Road, and Route 202 (10) adjacent to the impaired segments, any education and outreach program should highlight the importance of managing waste from horses, dogs, and other pets and not feeding waterfowl and wildlife. The municipalities and residents can take measures to minimize waterfowl-related impacts such as allowing tall, coarse vegetation to grow in the riparian areas of West Branch Salmon Brook that are frequented by waterfowl. Waterfowl, especially grazers like geese, prefer easy access to water. Maintaining an uncut vegetated buffer along the shore will make the habitat less desirable to geese and encourage migration. In addition, any educational program should emphasize that feeding waterfowl, such as ducks, geese, and swans, may contribute to water quality impairments in West Branch Salmon Brook and can harm human health and the environment. Animal wastes should be disposed of away from any waterbody or storm drain system. BMPs effective at reducing the impact of animal waste on water quality include installing signage, providing pet waste receptacles in high-use areas, enacting ordinances requiring the clean-up of pet waste, and targeting educational and outreach programs in problem areas. 3) Identify areas along the West Branch Salmon Brook to implement Best Management Practices (BMPs) to control stormwater runoff. As noted previously, 11% of the West Branch Salmon Brook watershed is considered urban, particularly near the impaired segments of West Branch Salmon Brook along Route 20 and Route 202 (10), and Stations 2455 and 1082 along both impaired segments exceeded wet-weather geometric mean limits. As such, stormwater runoff is likely contributing bacteria to the waterbodies. It may be beneficial to investigate the impact that Salmon Brook Park has on the adjacent West Branch Salmon Brook (Segment 1b). To identify other areas that are contributing bacteria to the impaired segments, the municipalities should conduct wet-weather sampling at any stormwater outfalls that discharge directly to the impaired
Page 171
FINAL West Branch Salmon Brook Watershed Summary September 2012 West Branch Salmon Brook Watershed TMDL Page 21 of 26 segments in the West Branch Salmon Brook watershed. To treat stormwater runoff, the municipalities should identify areas along the impaired segment to install BMPs designed to encourage stormwater to infiltrate into the ground before entering the waterbodies. These BMPs would disconnect impervious areas and reduce pollutant loads to the river. More detailed information and BMP recommendations can be found in the core TMDL document. 4) Develop a system to monitor septic systems. The entire West Branch Salmon Brook watershed relies on septic systems, and a geometric mean exceedance during dry-weather at Station 2455 along West Branch Salmon Brook (Segment 1a) may indicate nearby failing septic systems. If not already in place, Hartland and Granby should establish programs to ensure that existing septic systems are properly operated and maintained, and create an inventory of existing septic systems through mandatory inspections. Inspections help encourage proper maintenance and identify failed and sub-standard systems. Policies that govern the eventual replacement of sub-standard systems within a reasonable timeframe can be adopted. The municipalities should also develop a program to assist citizens with the replacement and repair of older and failing systems.
Page 172
FINAL West Branch Salmon Brook Watershed Summary September 2012 West Branch Salmon Brook Watershed TMDL Page 22 of 26 BACTERIA DATA AND PERCENT REDUCTIONS TO MEET THE TMDL Table 7: West Branch Salmon Brook Bacteria Data Waterbody ID: CT4319-00_01a Characteristics: Freshwater, Class A, Potential Drinking Water Supplies, Habitat for Fish and other Aquatic Life and Wildlife, Recreation, Navigation, and Industrial and Agricultural Water Supply Impairment: Recreation (E. coli bacteria) Water Quality Criteria for E. coli: Geometric Mean: 126 colonies/100 mL Single Sample: 410 colonies/100 mL Percent Reduction to meet TMDL: Geometric Mean: 65% Single Sample: 79% Data: 2007-2008 from CT DEEP targeted sampling efforts, 2012 TMDL Cycle Single sample E. coli (colonies/100 mL) data from Station 2455 on West Branch Salmon Brook (Segment 1a) with annual geometric mean calculated Station Name Station Location Date Results Wet/Dry Geomean 2455 DS of Route 10 bridge at McLean Game Refuge 6/4/2007 1986* (79%) wet 364* (65%) 2455 DS of Route 10 bridge at McLean Game Refuge 6/18/2007 133 dry 2455 DS of Route 10 bridge at McLean Game Refuge 7/2/2007 187 dry 2455 DS of Route 10 bridge at McLean Game Refuge 7/16/2007 383 dry 2455 DS of Route 10 bridge at McLean Game Refuge 8/13/2007 135 dry 2455 DS of Route 10 bridge at McLean Game Refuge 8/27/2007 1664 dry 2455 DS of Route 10 bridge at McLean Game Refuge 9/10/2007 771 dry 2455 DS of Route 10 bridge at McLean Game Refuge 9/17/2007 146 dry 2455 DS of Route 10 bridge at McLean Game Refuge 9/24/2007 169 dry 2455 DS of Route 10 bridge at McLean Game Refuge 10/1/2007 512 dry
Page 173
FINAL West Branch Salmon Brook Watershed Summary September 2012 West Branch Salmon Brook Watershed TMDL Page 23 of 26 Single sample E. coli (colonies/100 mL) data from Station 2455 on West Branch Salmon Brook (Segment 1a) with annual geometric mean calculated (continued) Station Name Station Location Date Results Wet/Dry Geomean 2455 DS of Route 10 bridge at McLean Game Refuge 6/9/2008 199 wet 259 2455 DS of Route 10 bridge at McLean Game Refuge 6/23/2008 563 wet 2455 DS of Route 10 bridge at McLean Game Refuge 7/7/2008 318 dry 2455 DS of Route 10 bridge at McLean Game Refuge 7/21/2008 241 wet 2455 DS of Route 10 bridge at McLean Game Refuge 8/4/2008 262 dry 2455 DS of Route 10 bridge at McLean Game Refuge 8/18/2008 135 dry Shaded cells indicate an exceedance of water quality criteria *Indicates single sample and geometric mean values used to calculate the percent reduction Wet and dry weather geometric mean values for Station 2455 on West Branch Salmon Brook (Segment 1a) Station Name Station Location Years Sampled Number of Samples Geometric Mean Wet Dry All Wet Dry 2455 DS of Route 10 bridge at McLean Game Refuge 2007-2008 4 12 321 481 280 Shaded cells indicate an exceedance of water quality criteria Weather condition determined from rain gage at the Hartford Bradley International Airport
Page 174
FINAL West Branch Salmon Brook Watershed Summary September 2012 West Branch Salmon Brook Watershed TMDL Page 24 of 26 Table 8: West Branch Salmon Brook Bacteria Data Waterbody ID: CT4319-00_01b Characteristics: Freshwater, Class A, Potential Drinking Water Supplies, Habitat for Fish and other Aquatic Life and Wildlife, Recreation, Navigation, and Industrial and Agricultural Water Supply Impairment: Recreation (E. coli bacteria) Water Quality Criteria for E. coli: Geometric Mean: 126 colonies/100 mL Single Sample: 410 colonies/100 mL Percent Reduction to meet TMDL: Geometric Mean: 28% Single Sample: 60% Data: 2007-2009 from CT DEEP targeted sampling efforts, 2012 TMDL Cycle Single sample E. coli (colonies/100 mL) data from Stations 1082 and 2456 on West Branch Salmon Brook (Segment 1b) with annual geometric mean calculated Station Name Station Location Date Results Wet/ Dry Geomean 1082 Adjacent to Salmon Brook Park 6/9/2008 908 wet 174* (28%) 1082 Adjacent to Salmon Brook Park 6/23/2008 134 wet 1082 Adjacent to Salmon Brook Park 7/7/2008 63 dry 1082 Adjacent to Salmon Brook Park 7/21/2008 295 wet 1082 Adjacent to Salmon Brook Park 8/4/2008 144 dry 1082 Adjacent to Salmon Brook Park 8/18/2008 86 dry 1082 Adjacent to Salmon Brook Park 6/1/2009 30 dry 99 1082 Adjacent to Salmon Brook Park 6/15/2009 218 wet 1082 Adjacent to Salmon Brook Park 6/29/2009 31 dry 1082 Adjacent to Salmon Brook Park 7/13/2009 62 dry 1082 Adjacent to Salmon Brook Park 7/27/2009 74 wet 1082 Adjacent to Salmon Brook Park 8/10/2009 97 dry 1082 Adjacent to Salmon Brook Park 8/24/2009 1025* (60%) wet
Page 175
FINAL West Branch Salmon Brook Watershed Summary September 2012 West Branch Salmon Brook Watershed TMDL Page 25 of 26 Single sample E. coli (colonies/100 mL) data from Stations 1082 and 2456 on West Branch Salmon Brook (Segment 1b) with annual geometric mean calculated (continued) Station Name Station Location Date Results Wet/ Dry Geomean 2456 Upstream of Barn Door Hills Road footbridge at McLean Game Refuge 9/10/2007 98 dry 65 2456 Upstream of Barn Door Hills Road footbridge at McLean Game Refuge 9/17/2007 86 dry 2456 Upstream of Barn Door Hills Road footbridge at McLean Game Refuge 9/24/2007 41 dry 2456 Upstream of Barn Door Hills Road footbridge at McLean Game Refuge 10/1/2007 52 dry Shaded cells indicate an exceedance of water quality criteria *Indicates single sample and geometric mean values used to calculate the percent reduction Wet and dry weather geometric mean values for Stations 1082 and 2456 on West Branch Salmon Brook (Segment 1b) Station Name Station Location Years Sampled Number of Samples Geometric Mean Wet Dry All Wet Dry 1082 Adjacent to Salmon Brook Park 2008-2009 6 7 128 290 64 2456 Upstream of Barn Door Hills Road footbridge at McLean Game Refuge 2007 0 4 65 NA 65 Shaded cells indicate an exceedance of water quality criteria Weather condition determined from rain gage at the Hartford Bradley International Airport
Page 176
FINAL West Branch Salmon Brook Watershed Summary September 2012
West Branch Salmon Brook Watershed TMDL
Page 26 of 26
REFERENCES
Costa, Joe (2011). Calculating Geometric Means. Buzzards Bay National Estuary Program. Online:
http://www.buzzardsbay.org/geomean.htm
CTDEEP (2010). State of Connecticut Integrated Water Quality Report. Online:
http://www.ct.gov/dep/lib/dep/water/water_quality_management/305b/ctiwqr10final.pdf
CTDEEP (2011). State of Connecticut Water Quality Standards. Online:
http://www.ct.gov/dep/lib/dep/water/water_quality_standards/wqs_final_adopted_2_25_1 1.pdf
CWP (2003). Impacts of Impervious Cover on Aquatic Systems. Center for Watershed Protection.
Online: http://clear.uconn.edu/projects/tmdl/library/papers/Schueler_2003.pdf
Federal Register 67 (March 15, 2002) 11663-11670. Urban Area Criteria for Census 2000.
Mallin, M.A., K.E. Williams, E.C. Escham, R.P. Lowe (2000). Effect of Human Development on
Bacteriological Water Quality in Coastal Wetlands. Ecological Applications 10: 1047-
1056.
USEPA (2001). Managing Pet and Wildlife Waste to Prevent Contamination of Drinking Water. Online:
http://www.epa.gov/safewater/sourcewater/pubs/fs_swpp_petwaste.pdf.
USEPA (2011a). Managing Nonpoint Source Pollution from Agriculture. Online:
http://water.epa.gov/polwaste/nps/outreach/point6.cfm
USEPA (2011b). Riparian Zone and Stream Restoration. Online: http://epa.gov/ada/eco/riparian.html
USEPA (2011c). Land Use Impacts on Water. Online: http://epa.gov/greenkit/toolwq.htm
Page 177
MS4 ANNU AL REPORT TOWN OF GRANBY JANUARY – DECEMBER 2024 P REPARED BY: A tlas 290 R oberts Street-S uite 301 E ast Hartford, Connecticut 06108 March 25, 2025
Page 178
Page | i TABLE OF CONTENTS TOWN OF GRANBY 202 4 ANNUAL REPORT………………………………………….1 FIGURES Figure 1 – MS4 System Map Figure 2 – Priority Outfalls Map Figure 3 – Impaired Waters by Catchment Map Figure 4 – Urbanized Areas by Catchment Map Figure 5 – Prioritized Retrofitting by Catchment Map Figure 6 – Catchment Priority Rankings Map APPENDICES Septic Repair and Replacment Wet Weather Sampling Oufalls to Impaired Waterbodies Dry Weather Inspections Dry Weather Inspections Illicit Discharge Sampling Results Catchment Assessment and Prioirty Ranking Matrix
Page 179
1 MS4 Gen eral Permit Town of Granby 202 4 Annual Report Permit Number GSM 000029 January 1, 2024 – December 31, 2024 Primary MS4 Contact: Kirk Severance , Director of Public Works, kseverance@granby -ct.gov This report documents Granby’s efforts to comply with the conditions of the MS4 General Permit to the maximum extent practicable (MEP) from January 1, 2024 to December 31, 2024. Par t I: Sum mary of Minimum Control Measure Acti vities 1. Public Education and Outreach ( Section 6 (a )(1) / page 19 ) 1.1 BMP Summary BMP Activities in current reporting period Sources Used (if applicable) Method of Distribution Audience (and number of people reached) Measurable Goal Department / Person Responsible Additional details 1 - 1 Implement public education and outreach The Town has linked educational materials to its Stormwater Management page, including fact sheets pertaining to animal waste and water quality, lawn care, septic system care, pest management and biological controls, and managing household chemicals. Town Website and NEMO website. Electronically ~1 1 , 2 00 Town Residents Raise awareness that polluted stormwater runoff is the most significant source of water quality problems. Department of Public Works/ Kirk A. Severance, Director of Public Works Stormwater Management CT NEMO 1 - 2 Address education/ outreach for pollutants of concern I n 2020, t he West Salmon Brook was identified as an impaired waterbody by bacteria (E. coli). Educational materials tailored and targeted to educate the sources of bacteria were provided online. These included Town Website Electronically and brochures ~1 1 , 2 00 Town Residents Educate the public about the possible sources, impacts, and pollution reduction practices of bacteria. Department of Public Works/ Kirk A. Severance, Director of Public Works FVHD Pet Waste and Water Quality
Page 180
2 1.2 Describe any Public Education and Outreach activities planned for the next year, if applicable. 1. The Town of Granby will continue to raise awareness and motivate resident to use Best Management Practices to reduce Storwmater runoff. This will include publishing tailored and targeted information regarding the 2024 Impaired Water Quality Report 303(d) when it is published. 2. The fact sheets are reviewed every year for their relevance to the Town of Granby and updated if new best management practices have been identified . 2. Public Involvement/ Participation (Section 6(a)(2) / page 21 ) 2.1 BMP Summary BMP Status (Complete, Ongoing, In Progress, or Not started) Activities in current reporting period Measurable Goal Department / Person Responsible Date completed or projected completion date ( Include the start date for anything that is ‘in progress’) Location Posted Additional details 2 - 1 Final Stormwater Management Plan publicly available Completed Town Website Provide access to Stormwater Management Plan and a contact for public questions or comments. Department of Public Works , Kirk A. Severance . Completed on April 29 th , 2017 Stormwater Management Plan The Town has a Stormwater Management Plan that was developed for the MS4 Permit that was issued for the period 2017 - 2022. The CTDEEP reauthorized the MS4 Permit effective October 2023. BMP Activities in current reporting period Sources Used (if applicable) Method of Distribution Audience (and number of people reached) Measurable Goal Department / Person Responsible Additional details factsheets pertaining to managing animal (pet and waterfowl) waste, septic system care, and livestock manure management. The Farmington Valley Health District (FVHD) provides additional education materials to the Town.
Page 181
3 BMP Status (Complete, Ongoing, In Progress, or Not started) Activities in current reporting period Measurable Goal Department / Person Responsible Date completed or projected completion date ( Include the start date for anything that is ‘in progress’) Location Posted Additional details 2 - 2 Comply with public notice requirements for Annual Reports (annually by 2/15) Completed P osted 2023 Annual Report via Town website. P rovide access to 2023 Annual Report and a contact for public questions or comments. Department of Public Works , Kirk A. Severance . Ongoing - Annual ly Annual Report s Public comment and outreach were encouraged on the Town of Granby’s website during the comment period for the 2023 MS4 Annual Report. 2 - 3 A dditional BMP: Hazardous Waste Collection Completed In partnership with Farmington, Canton, Simsbury, and Avon for hazardous waste collection days. Provide a safe way for the residents of Granby to dispose of hazardous materials that can accumulate in homes, preventing improper disposal that can pollute environmental resources. Department of Public Works , Kirk A. Severance . April 20 th , June 8 th , October 19th 2024 Hazardous Waste Day Collections Collections are held three (3) times a year. 2.2 Describe any Public Involvement/Participation activities planned for the next year, if applicable. 1. The Town of Granby will continue to encourage public comment and review for the 2024 Annual Report in 2025. 2. The Town of Granby continues to receive public input on development projects through various avenues, including public hea rings, online permitting processes, citizen comment periods, planning and zoning (P&Z) recorded meetings, posted agendas and minutes, notifications of all public hearings, decisions, and agendas, or phone communications. 3. The annual Hazardous Waste Collection, which is provided ann ually, will be completed in 202 5 . Specific dates are available on the Town website .
Page 182
4 3. Illicit Discharge Detection and Elimination (Section 6( a )(3) and Appendix B / page 22 ) 3.1 BMP Summary BMP Status (Complete, Ongoing, In Progress, or Not started) Activities in current reporting period Measurable Goal Department / Person Responsible Date completed or projected completion date ( Include the start date for anything that is ‘in progress’) Additional details 3 - 1 Develop written IDDE program (Due 7/1/19) Completed The Town has completed a written IDDE program. Develop written plan of IDDE program Department of Public Works , Kirk A. Severance . Completed in November 201 7. The Town Ordinance 146 - Stormwater Management, provided the legal authority to prohibit and eliminate illicit discharges. The IDDE Program was described in the Stormwater Management Plan. The Department of Public Works is the central reporting agency for citizen illicit discharge complaint filings. Illicit discharges are filed and updated periodically with abatement activities, sampling, or other pertinent information. 3 - 2 Develop list and maps of all MS4 stormwater outfalls in priority areas (Due 7/1/20) Completed The Town has reviewed the list of all MS4 stormwater outfalls in priority areas based on updated information. All outfalls mapped Department of Public Works , Kirk A. Severance . Completed prior to July 2019 Mapping and data will be continually maintained as outfalls are tested, repaired, etc. 3 - 3 Implement citizen reporting program (Ongoing) Completed The general public may report suspected illicit discharges through the Department of Public Works or online. Provide a reporting mechanism and log Board of Selectmen/ Town Manager Completed November 2018 The citizen reporting form for illicit discharges can be found here: Citizen Reporting Program 3 - 4 Establish legal authority to prohibit illicit discharges (Due 7/1/19) Completed An Illicit Discharge Detection and Elimination Ordinance was enacted in 2016. Adopt ordinance Board of Selectmen/Town Manager Completed November 2016 The Illicit Discharge Ordinance can be found here: Illicit Discharge Ordinance
Page 183
5 BMP Status (Complete, Ongoing, In Progress, or Not started) Activities in current reporting period Measurable Goal Department / Person Responsible Date completed or projected completion date ( Include the start date for anything that is ‘in progress’) Additional details 3 - 5 Develop record keeping system for IDDE tracking (Due 7/1/17) Ongoing The Department of Public Works has developed a record keeping system. Utilizing Excel, illicit discharges are tracked. Maintain IDDE list. Department of Public Works/ Kirk A. Severance, Director of Public Works Completed in November 2017 - ongoing for throughout permit life. 3 - 6 Address IDDE in areas with pollutants of concern Ongoing Wet weather screening was conducted at priority outfalls. Dry weather inspections were conducted at outfalls throughout the Town. Catchment Rankings have been completed. SSOs are under investigations. Wet weather testing and additional investigation as necessary. Department of Public Works/ Kirk A. Severance, Director of Public Works/Atlas Ongoing Started in 2020 3.2 Describe any IDDE activities planned for the next year, if applicable. 1. Continue wet weather sampling and dry weather screening as a part of follow up and catchment investigations . 3. Respond to any illicit discharge complaints . 4. Conduct Follow - up and Catchment Investigations . 5. Continue to provide annual training to Town staff. 3.3 Provide a record of all citizen reports of suspected illicit discharges and other illicit discharges occurring during the reporting period and SSOs occurring July 2017 through end of reporting period using the following table. Illicit discharges are any unpermitted discharge to waters of the state that do not consist entirely of stormwater or uncontaminated groundwater except those discharges identified in Section 3(a)(2) of the MS4 general permit when such non- stormwater discharges are not significant contributors of pollution to a discharge from an identified MS4.
Page 184
6 Location (Lat long/ street crossing /address and receiving water) Date and duration of occurrence Discharge to MS4 or surface water Estimated volume discharged Known or suspected cause / Responsible party Corrective measures planned and completed (include dates) Sampling data (if applicable) 286 West Granby Road 4/9/2021 Approximately 195 ft. from OF - 152 Unknown Underground spring Atlas was called to investigate a potential illicit discharge in the Town. Upon arrival, water was found to be discharging from a driveway at a steady, bubbling rate, with heavy algae growth. Discharge lead down the driveway into an adjacent ditch. This runoff disch arge is in the vicinity of OF - 152, which in turn discharges to the West Branch Salmon Brook. A sample of the discharge was submitted for the analysis of E. coli , T. coli, nitrite, nitrate, and phosphorus to assess potential illicit discharge sour ces. A review of sampling data from the nearby MS4 outfall (OF - 152) did not indicate illicit discharges were entering this catchment. Laboratory analytical results were indicative of groundwater, and it is suspected an underground spring had worked its way to the surface. E. coli - <10 MPN/100mL T. Coli - 10 MPN/100mL Nitrite - <0.010 mg/L Nitrate - 0.55 mg/L Phosphorus - 0.304 mg/L Canal Street Unknown None. Unknown Property Owner A property owner diverted discharge from a sump pump. The discharge was directed down the driveway and into the road. The Town Engineer and Director of Public Works met with the property owner, and discussed redirecting the discharge, as well as icing concerns on the road. The property owner was responsive and redirected the discharge onto a grassy area on the property. None. 23 Glen Road 12/15/2021 None. Unknown 80 - year - old septic system - end of life An evaluation by FVHD led to the replacement of the s eptic system due to old age and being at the end of its life. Installation of a new 1250 - gallon septic tank and leaching field was completed and a permit to discharge was granted, recommending the daily discharge should not exceed 2/3 of the permitted flow. None. 2022 21 Oakwood Drive 3/21/2022 None. Unknown Unknown cause for replacement of septic system Following site evaluation by FVHD, installation of a new septic system was recommended for unknown reasons. Approval and a permit were provided by FVHD for replacement with a new 1000 - gallon septic tank and 495 s eptic leach field . None.
Page 185
7 Location (Lat long/ street crossing /address and receiving water) Date and duration of occurrence Discharge to MS4 or surface water Estimated volume discharged Known or suspected cause / Responsible party Corrective measures planned and completed (include dates) Sampling data (if applicable) 31 Harmony Hill Road 4/11/2022 East Branch Salmon Brook Unknown Failed septic system inspection Site evaluation by FVHD resulted in a failed inspection of the septic system. Ins t allation of a new 1000 - gallon septic tank and 495 septic leaching area was recommended. A proposal for septic system repair was submitted by a licensed installer. None. 73 Silkey Road 6/ 15 /2022 Mountain Brook/ Moosehorn Brook Unknown Unknown reason for septic system replacement FVHD evaluated the site for installation of a new septic system for unknown reasons. A r eplacement plan was provided by the installer , which includes a two compartment 1000 - gallon septic tank and a 495 septic leaching field. FHVD approved the plan and provided a permit for replacement. None. 6 Glen Road 9/21/ 20 22 None. Unknown Leaking tank due to invasive roots FVHD evaluated the septic system where the tank was leaking due to invasive roots. Recommendations for repair included installation of a new 1000 - gallon septic tank and 495 septic leaching area. Awaiting installation and permit to repair. None. 80 Canal Road 2022 MS4 System Unknown A sump pump was reported as discharging to the road and into a nearby catch basin. Icing on the road was also prevalent following this discharge. The Town investigated this report. Following investigation, the resident rerouted the sump pump. None. 2023 Moose h orn Road cul - de - sac 7/18/2023 MS4 System, Adjacent Stream Unknown It appears that silt, sediment, and gravel from the driveway entered the Town’s MS4 system and an adjacent stream and can therefore be considered an illicit discharge. Site evaluation by Atlas resulted in a determination that the discharge was illicit. Washout from the shared driveway at 30, 31, 33, and 54 Moose h orn Road was determined to have been the cause of the discharge. No corrective action has been done at this time. None The Town coordinated with the Farmington Valley Health District (FVHD) in October 2023 regarding addresses in the Town where septic system repairs were completed. According to the FVHD, approximately 27 septic repairs/replacements were conducted in 2023. Evaluation of these repairs are being conducted in coordination with Atlas to determine if certain sections of the Town have patterns of septic repairs and/or failures .
Page 186
8
Location
(Lat long/ street
crossing /address
and receiving
water)
Date and
duration of
occurrence
Discharge to MS4
or surface water
Estimated
volume
discharged
Known or suspected
cause / Responsible
party
Corrective measures planned and completed
(include dates)
Sampling
data
(if
applicable)
2024
166 Salmon Brook
Street
9/15/2024
None.
~50 gallons
Pump failure at sanitary
sewer pump station
along Salmon Brook
Road
A small release of partially treated sewage
occurred at a wastewater pumping station at
166 Salmon Brook Street and Route 10. The
pump station identified a pump failure, causing
effluent to leak from the holding tank into a
nearby swale running parallel to
Route 10. The
tank cover remained intact, so the release
consisted mostly of gray water rather than raw
sewage. Fill material was placed in the swale to
prevent discharge into the local brook, and the
spill was contained within the swale without
affecting
nearby water bodies.
None.
3.4
Provide a summary of actions taken to address septic failures using the table below.
Method used to track
illicit discharge reports
Location and nature of structure
with failing septic systems
Actions taken to respond to and address the
failures
Impacted waterbody or
watershed, if known
Dept. / Person
responsible
T
he Farmington Valley Health District (FVHD) received and maintains records of septic failures along with actions taken. All s
anitary sewer connections and system
extensions are
managed by the Building Department.
The Town will begin to formally coordinate with Building Department regarding records of septic failures.
T
he Town is
currently investigating any septic repairs and/or failures through the FVHD as well.
See
Attachment
I
for
a list of
septic
repairs and replacements
.
3.5 Briefly describe the method and
effectiveness
of said method used to track illicit discharge reports.
Residents of the Town can report illicit discharges directly to the Department of Public Works, or via
https://www.granby
-
ct.gov/DocumentCenter/View/217/Illicit
-
Discharge
-
Reporting
-
Form
-
PDF?bidId=
. The Department of Public Works staff then performs investigations. Digital recor
d
s
on the Town server are used for tracking illicit discharges in
excel format.
3.6
IDDE reporting metrics
Metric
s
Estimated or actual number of MS4 outfalls
185
Estimated or
actual number of interconnections
Under
I
nvestigation
Page 187
9 Metric s Interconnection mapping complete In progress System - wide mapping complete (detailed MS4 infrastructure) 100% Outfall assessment and priority ranking 100 % Eight (8 ) outfalls were chosen as priority outfalls in 2022 . All eight (8) outfalls were sampled in 202 4 . Priority rankings may change throughout the permit term as new data are collected and evaluated . Dry weather screening of all High and Low priority outfalls complete 9 0 % All dry weather screening at outfalls in high priority outfalls and discharging to impaired waterbodies have been completed . Catchment investigations complete 5 Follow - up investigations conducted in 2023 3 Follow - up investigations conducted in 2024 Estimated percentage of MS4 catchment area investigated TBD 3.7 Briefly describe the IDDE training for employees involved in carrying out IDDE tasks including what type of training is provided and how often it is given (minimum once per year). In September 2024, key staff in the Town of Granby received training to comply with the provisions of the Municipal Separate Storm Sewer S ystem (MS4) General Permit. Annual training is conducted to reinforce best practices for identifying and reporting illicit discharges and improper disposal, as well as spil l response protocols. These sessions will also reiterate the Town’s general goals and objectives outlined in the Stormwater Manage ment Plan (SMP). 4. C onstruction Site Runoff Control (Section 6(a)(4) / page 25 ) 4.1 BMP Summary BMP Status (Complete, Ongoing, In Progress, or Not started) A ctivities in current reporting period Measurable Goal Department / Person Responsible Date completed or projected completion date ( Include the start date for anything that is ‘in progress’) Additional details 4 - 1 Implement, upgrade, and enforce land use regulations or other legal authority to meet requirements of MS4 general permit (Due 7/1/20) Ongoing throughout permit lifetime. There have been no updates in land - use regulations or other legal authority as it pertains to the MS4 permit in the Town of Granby in 202 4. Revise land - use regulations. Department of Public Works/ Kirk A. Severance, Director of Public Works Completed in 2018 - continues annually These regulations include maintenance of detention basins, separators, and/or embankments used to manage stormwater quality.
Page 188
10 BMP Status (Complete, Ongoing, In Progress, or Not started) A ctivities in current reporting period Measurable Goal Department / Person Responsible Date completed or projected completion date ( Include the start date for anything that is ‘in progress’) Additional details 4 - 2 Develop/Implement plan for interdepartmental coordination in site plan review and approval (Ongoing) Completed Kevin W. Clark, P.E., L.S., Town Engineer prepares land use review letters for most applications to the Inland Wetlands Commission, Planning Commission and Zoning Commission. Utilize interdepartmental coordination in site plan review and approval as it pertains to the MS4 permit. Land Use Commission Members Completed in 2017 - continues annually 4- 3 Review site plans for stormwater quality concerns (Ongoing) Completed Kevin W. Clark, P.E., L.S., Town Engineer encourages the use of LID and Stormwater BMPs practices as contained in the 2004 Connecticut Stormwater Quality Manual. Issue review comments and review revised plans for MS4 compliance. Town Engineer/Kevin W. Clark, P.E., L.S. Completed in 20 1 7 - continues annually Projects that fall under the Planning and Zoning Department are reviewed for compliance with the CTDOT drainage manual. 4- 4 Conduct site inspections (Ongoing) Ongoing The Town conducts construction site inspections for the proper implementation and maintenance of soil erosion and sediment control measures. Document inspections and actions. Community Development Department Director/Abigail Kenyon, AICP/Town Engineer/Kevin. W. Clark, P.E., L.S. Completed in 2017 - continues annually 4- 5 Implement procedure to allow public comment on site development (Ongoing) Ongoing The land use application process allows for public comment on land use applications. Applications are submitted to the Inland Wetlands Agency, Planning Commission, Zoning Commission during the Public Hearing Process, when applicable. Provide an opportunity for public comment/ involvement. Community Development Department Director/ Abigail Kenyon, AICP and Land Use Commission Members Completed in 2017 - continues annually 4- 6 Implement procedure to notify developers about DEEP construction stormwater permit (Ongoing) Ongoing During engineering revi ews, letters are typically prepared as part of the land use application process. These letters are used to make developers aware of the need to register for the Construction Stormwate r General Permit. Include comments to applications. Community Development Department Director/Abigail Kenyon, AICP and Town Engineer/Kevin W. Clark, P.E., L.S. Completed in 2017 - continues annually.
Page 189
11 4.2 Describe any Construction Site Runoff Control activities planned for the next year, if applicable. 1. The Town will continue to utilize zoning regulations and inspections as a means to ensure BMPs are utilizing be site develope rs. 5. Post - construction S tormwater M anagement (Section 6( a )(5) / page 27 ) 5.1 BMP Summary BMP Status (Complete, Ongoing, In Progress, or Not started) Ac tivities in current reporting period Measurable Goal Department / Person Responsible Date completed or projected completion date ( Include the start date for anything that is ‘in progress’) Additional details 5- 1 Establish and/or update legal authority and guidelines regarding LID and runoff reduction in site development planning (Due 7/1/22) In Progress Current Town Building and Planning & Zoning regulations generally meet LID/runoff reduction requirements for development and redevelopment projects. Adopt BMPs for any activity, operation, or facility which may cause or contribute to the pollut ant loading of stormwater, the storm drain system, or waters of the U.S. Community Development Department Director/ Abigail Kenyon, AICP and Land Use Commission Members Started in 2019 Zoning regulations were updated with Section 4.2 .4 Stormwater Management. The Town of Granby Zoning Regulations can be found here: ZONING REGULATIONS (granby - ct.gov) 5- 2 Enforce LID/runoff reduction requirements for development and redevelopment projects (Due 7/1/22) In Progress Current Town Building and Planning & Zoning regulations generally meet LID/runoff reduction requirements for development and redevelopment projects. As such, enforcement for such activities would be followed as any other Town coding violation would be. Enforce regulations and guidelines of LID and runoff reductions. Community Development Department Director/Abigail Kenyon, AICP, Town Engineer/Kevin W. Clark, P.E., L.S. and Land Use Commission Members In progress - Started in July 2019 The Town of Granby’s Planning and Zoning page can be found here: Planning & Zoning Commission | Granby, CT (granby- ct.gov)
Page 190
12 5- 3 Identify retention and detention ponds in priority areas (Due 7/1/20) Completed A retention pond layer was added to in ArcGIS for the Town. Compile a list and complete mapping of Town - owned detention basins. Department of Public Works/ Atlas, Town Engineer/Kevin W. Clark, P.E., L.S. Completed 5- 4 Implement long - term maintenance plan for stormwater basins and treatment structures (Ongoing) Completed A Long - Term Operation and Maintenance Plan was developed for the Town. This plan includes regular inspections and the documentation of all Town - owned retention basins on an as - needed basis, with a minimum full inspection once every five (5) years. Annually inspect and maintain facilities. Department of Public Works/ Kirk A. Severance, Director and Town Engineer/Kevin W. Clark, P.E., L.S. Completed 5- 5 DCIA mapping (Due 7/1/20) Completed The DCIA was calculated for the Town with assistance from Nathan L. Jacobson & Associates. Atlas has mapped the DCIA areas through ArcGIS. Provide an understandin g of the Town’s overall DCIA to the MS4 infrastructure. Nathan L. Jacobson & Associates/Atlas Completed 5- 6 Address post - construction issues in areas with pollutants of concern In Progress In post - construction areas, if erosion or high accumulation of sedimentation are found during the annual inspections conducted under the long - term maintenance plan, the Town of Granby will prioritize these areas for DCIA retrofit projects. Address post - construction areas where erosion or high accumulation of sedimentation are found during annual inspections. Community Development Department Director/Abigail Kenyon, AICP and Town Engineer, Kevin W. Clark, P.E., L.S. In Progress - Started in 2021 5.2 Describe any Post - Construction Stormwater Management activities planned for the next year, if applicable. The Town will continue to monitor, clean, and repair settling/silting basins, catch basins, outfalls, swales, etc . in 2025. 5.3 Post- Construction Stormwater Management reporting metrics For details on this requirement, visit https://nemo.uconn.edu/ms4/tasks/post-construction/ . Scroll down to the DCIA section. Metrics B aseline ( 2012 ) Directly Connected Impervious Area (DCIA) 21.19 acres
Page 191
13
DCIA disconnected (redevelopment plus retrofits)
acres this year
(TBD)
/ acres total
(TBD)
Retrofit
projects
completed
Under Development
DCIA disconnected
0
%
This
yea
r
Estimated cost of retrofits
$TBD
Detention or retention ponds identified
4
detention ponds and
4
retention
ponds.
5.4 Briefly describe the method to be used to determine baseline DCIA.
The DCIA Mapping was conducted in substantial
accordance with the methodologies presented in the October 25, 2017 UConn CLEAR Webinar entitled CT MS4 Mapping
Details, Clarifications and Tools, the October 19, 2018 UConn CLEAR Workshop entitled CT MS4 Mapping Workshop as well as information contained i
n the EPA reference
entitled Estimating Change in Impervious Area (IA) and Directly Connected Impervious Area (DCIA) for Massachusetts Small MS4
Permit utilizing Sutherland equations.
The DCIA computations were prepared utilizing Connecticut Environmental Conditions Online MS4 base mapping prepared by
UConn.
CLEAR.
Impaired waters were determined from the report entitled 2018 Integrated Water Quality Report, dated August 01, 2019, prepared by the State of Connecticut Department of
Energy and Environmental protection.
The method to determine the 2012 baseline DCIA was to first compile the CT DEEP drainage basin characteristics in a Microsoft
Excel spreadsheet. Information on the
Connecticut Environmental Conditions Online MS4 Mapping was used to determine the impervious
area breakdown as Buildings, Roads and Other. For CT DEEP drainage
basins that fell in two or more municipalities the advanced mapping tab of Connecticut Environmental Conditions Online was us
ed to delineate and determine the applicable town
CT DEEP basin
area. It was assumed that the entire drainage basin characteristics were directly proportional to the applicable town CT DEEP
drainage basin area.
In that ConnDOT has a MS4 Stormwater Program which applies to state owned roads and facilities which the town has no control
over, it was decided that the impervious state
road area would be determined and deducted from the total impervious road area for e
ach CT DEEP drainage basin as the impervious road areas associated with state highways
and facilities constitutes a considerable portion of the total town impervious road area.
The ConnDOT state highway, parking lot and facility impervious road areas were then determined for each CT DEEP drainage basi
n. The ConnDOT state highway, parking lot
and facility impervious road areas were then deducted from the total town impervious road
area to determine a town owned impervious road area for each CT DEEP drainage
basin. Subsequent to the above deduction, the total impervious area in acres and percentage was then recomputed for each CT D
EEP drainage basin.
The DCIA formula for each of four development types was then utilized to compute the DCIA. The impervious area in acres was a
ssigned to each of the four Sutherland
equations which were modified for the northeastern United State. The Sutherland equation to be utilized was determined using the following methodology:
For impervious percentage less than 6%:
100% of the impervious area was assigned to the slight connectivity Sutherland Equation where DCIA% = 0.01*(IA%)2.0
For an impervious area between 6% and 12 %:
50% of the area was assigned to the partial connectivity Sutherland Equation where DCIA% = 0.04*(IA%)1.7
and
50% was assigned to the average connectivity Sutherland Equation where DCIA% =
0.10*(IA%)1.5
For an impervious area between 12% and 18 %:
50% of the area was assigned to the average connectivity Sutherland Equation where DCIA% = 0.10*(IA%)1.5
and
Page 192
14 50% was assigned to the high connectivity Sutherland Equation where DCIA% = 0.40*(IA%)1.2 For an impervious area of greater than 18 %: 100% of the area was assigned to the high connectivity Sutherland Equation where DCIA% = 0.40*(IA%)1.2 The DCIA for each CT DEEP drainage basin was then summed to determine the entire town DCIA. Subsequent to completion of 2012 Baseline DCIA computations, UConn CLEAR Mapping available on Connecticut Environmental Conditions Online (CT ECO) was revised to se parate road impervious area into State Road Impervious Area (Acres) and Town Road Impervious Area (Acres). The original 2012 Baseline DCIA computations were revised utilizing the UConn CLEAR State Road Impervious Area (Acres) and To wn Road Impervious Area (Acres). 6. Pollution Prevention/Good Housekeeping (Section 6( a )(6) / page 31 ) 6.1 BMP Summary BMP Status (Complete, Ongoing, In Progress, or Not started) A ctivities in current reporting period Measurable Goal Dep artment / Person Responsible Date completed or projected completion date ( Include the start date for anything that is ‘in progress’) Additional details 6- 1 Develop/implement formal employee training program (Ongoing) Ongoing Annual training related to the MS4 permit was conducted in September of 2024 by Atlas to the Town’s Department of Public Works and other applicable staff. Eliminate non - stormwater discharges into the storm sewers Department of Public Works/Atlas Ongoing Completed Annually Annual training was completed in September of 2024. 6- 2 Implement MS4 property and operations maintenance (Ongoing) Ongoing The Public Works maintains outdoor maintenance at the Town’s parks, school grounds, and all other Town - owned land. Additionally, the Public Works manages roads, including maintenance, resurfacing, drainage repairs, signage, winter plowing, street sweeping, etc. Eliminates/minimizes spills and/or pollutant releases to the environment and navigable waterways. Department of Public Works/ Kirk A. Severance, Director Ongoing throughout permit term . 6- 3 Implement coordination with interconnected MS4s Ongoing Coordination of the M S4 interconnection mapping bega n in 2019. CTDOT interconnections are currently under investigation by the CTDOT and will be added to the Town’s GIS system once this information is available. Inter connections of surrounding Town s are pending investigation. Update the GI S system with interconnected locations. Department of Public Works/ Kirk A. Severance, Director/Atlas Ongoing Started in 2019
Page 193
15 BMP Status (Complete, Ongoing, In Progress, or Not started) A ctivities in current reporting period Measurable Goal Dep artment / Person Responsible Date completed or projected completion date ( Include the start date for anything that is ‘in progress’) Additional details 6- 4 Develop/implement program to control other sources of pollutants to the MS4 Completed Department of Public Works/ Kirk A. Severance, Director/Atlas Completed The Town Ordinance 146 - Stormwater Management, provided the legal authority to regulate activities that contribute pollutants to the MS4 system. 6- 5 Evaluate additional measures for discharges to impaired waters* Ongoing Wet weather sampling events have been conducted, and priority outfalls were identified throughout the Town. Dry weather inspections are continuing for the entirety of the Town. As catchments are investigated, the Town will take measures to reduc e pollutants of concern . Follow - up and Catchment Investigation and corrective actions Department of Public Works/ Kirk A. Severance, Director/Atlas Ongoing - Started in 2018 Based on wet and dry weather testing, the Town will implement additional measures including but not limited to a retrofit program or source management to correct the problem at municipally owned or operated facilities, as well as IDDEs, where applicable. 6- 6 Track projects that disconnect DCIA (Ongoing) Ongoing A Stormwater Retrofit Program has been drafted and will be utilized as a method of tracking future DCIA disconnects. Track DCIA disconnects. Department of Public Works/ Kirk A. Severance, Director/Atlas Ongoing Started in 2021 The Town will utilize the Impervious Cover Tracking Sheet created by NEMO. This will allow the Town to track Project information, new developments, redevelopment, retrofits, changes in impervious cover, and cumulative totals. 6- 7 Implement infrastructure repair/rehab program (Due 7/1/21) Ongoing Inspections and maintenance are continually implemented throughout the Town’s MS4 infrastructure. Reduce/ eliminate causes or contributions of pollution or contamination of stormwater, the storm drain system, or waters of the U.S. Department of Public Works/ Kirk A. Severance, Director Ongoing - Started in 2021 6- 8 Develop/implement plan to identify/prioritize retrofit projects (Due 7/1/20) Ongoing A Stormwater Retrofit Program has been drafted. Prioritized areas and/or sites were identified based off of DCIA calculations, impaired waterbodies, current stormwater infrastructure, and the MEP of the Town. Develop retrofit projects Department of Public Works/ Kirk A. Severance, Director Ongoing - Started in 2021
Page 194
16 BMP Status (Complete, Ongoing, In Progress, or Not started) A ctivities in current reporting period Measurable Goal Dep artment / Person Responsible Date completed or projected completion date ( Include the start date for anything that is ‘in progress’) Additional details 6- 9 Implement retrofit projects to disconnect 2% of DCIA (Due 7/1/22) Ongoing As Retrofit Projects are identified, the Town will utilize the Impervious Cover Tracking Sheet to track and work towards disconnecting 2% of DCIA, or the MEP of the Town. Track and reduce DCIA impacts. Department of Public Works/ Kirk A. Severance, Director Ongoing - Started in 2021 6- 10 Develop/implement street sweeping program (Ongoing) Ongoing The Town currently implements a road sweeping program to address known areas of high sediment accumulation. Track swept lane miles. Department of Public Works/ Kirk A. Severance, Director Ongoing throughout permit term 6- 11 Develop/implement catch basin cleaning program (Ongoing) Ongoing The Town currently cleans catch - basins in areas where known conditions warrant sediment removal. Track material usage, and update plan as needed. Department of Public Works/ Kirk A. Severance, Director Ongoing throughout permit term 6- 12 Develop/implement snow management practices (Due 7/1/18) Ongoing The Town utilizes alternative road de - icing mixtures. These mixtures are modified on a yearly basis based on costs and emerging technologies. Track material usage, and update plan as needed. Department of Public Works/ Kirk A. Severance, Director Ongoing throughout permit term 6.2 Describe any Pollution Prevention/Good Housekeeping activities planned for the next year, if applicable. 1. Continue snow management and road sweeping activities 2. I mplementation of the Stormwater Retrofit Program 3.Update Catch Basin Cleaning Program and schedule basin cleanings for 202 5. 6.3 Pollution Prevention / Good Housekeeping reporting metrics Metrics Employee training provided for key staff September 2024 Street sweeping Curb miles swept miles Volume (or mass) of material collected tons Catch basin cleaning
Page 195
17 6.4 Catch basin cleaning program Provide any updates or modifications to your catch basin cleaning program. There are 1, 538 catch basins in the Town of Granby. 2017 - Approximately 480 catch basins were cleaned in 2017 by a subcontracted catch basin cleaning company. The catch basin cleanings are screened and recycled at the former town landfill site in conformance with CT DEEP regulatory guidance. 2018 - No catch basins were vacuumed . The sump depth (sump bottom to lowest pipe invert out) and accumulated sediment/debris depth was measured for more than 700 catch basins. 2019 - No catch basins were vacuumed . The sump depth (sump bottom to lowest pipe invert out) and accumulated sediment/debris depth was measured for more than 500 catch basins. Catch basins to be cleaned in early 2020 where applicable. 2020 - Approximately 844 catch basins were cleaned in spring of 2020 by a subcontracted catch basin cleaning company (including some dry wells). The catch basin cleanings are screened and recycled at the former Town landfill site , in conformance with CT DEEP regulatory guidance. 2021: Approximately 555 catch basins were cleaned in the spring of 2021 by a subcontracted catch basin cleaning company. The catch basin cleanings are screened and recycled at the former Town landfill site, in conformance with CTDEEP regulatory guidance. 2022: No catch basins were vacuumed . The sump depth (sump bottom to lowest pipe invert out) and accumulated sediment/debris depth was measured for 91 catch basi ns. Catch basins will be cleaned in early 2023 where applicable. Metrics Total catch basins in priority areas ( value will be less than or equal to total catch basins town or institution - wide) 1,227 Total catch basins town - (or institution - ) wide 1, 538 Catch basins inspected 725 Catch basins cleaned 671 Volume (or mass) of material removed from all catch basins 425 tons Volume removed from catch basins to impaired waters (if known) 120 tons Snow management Type(s) of deicing material used Treated Salt ( Clearlane) Total amount of each deicing material applied 892.83 tons Type(s) of deicing equipment used 1. One (1) 10 - Wheeler Plow/Spreader 2. Seven (7) 6 - Wheeler Plows/Spreaders 3. One (1) Mason Plow/Spreader *Application rate is 2 00 lbs. per lane mile Lane - miles treated (A lane - mile is a mile of roadway in a single driving lane) 188 lane - miles Snow disposal location Site specific - no Town snow yard Staff training provided on application methods & equipment Municipal turf management program actions (for permittee properties in basins with N/P impairments) Reduction in application of fertilizers (since start of permit) No Reduction in turf area (since start of permit) No Lands with high potential to contribute bacteria (dog parks, parks with open water, & sites with failing septic systems) Cost of mitigation actions/retrofits $ 235,818.00 in upgrading the sewer pump station at the Salmon Brook Park.
Page 196
18 2023: Approximately 483 catch basins were cleaned in the spring of 2023 with an approximate material volume of 140 tons remov ed. 2024: Approximately 725 catch basins were cleaned in 2024 with an approximate material volume of 425 tons removed. 6 .5 Retrofit Program B riefly describe the Retrofit Program identification and prioritization process, the projects selected for implementation, the rationale for the selection of those projects and the total DCIA to be disconnected upon completion of each project. (Due 7/1/20) The Stormwater Retrofit Program was drafted by the Town and Atlas in 2021 . The Program was designed to provide guidance on implementing LID, runoff reduction measures, or other means to disconnect or improve stormwater quality. To meet the 2% MEP disconnection goal, DCIA calculations, Urbanized areas, Impaired Waterbodies, and Catchment Rankings were utilized in identifying and prioritizing areas and/or projects to be selected for retrofits. DCIA by Catchment was identified utilizing the following formulas: High Connectivity DCIA%=0.4*(IA %) ^ 1.2 Directly Connected Area= (DCIA ) (IC Acres) Average Connectivity DCIA%=0.1*(IA %) ^ 1.5 Directly Connected Area= (DCIA ) (IC Acres) Partial Connectivity DCIA%=0.04*(IA %) ^ 1.7 Directly Connected Area= (DCIA ) ( IC Acres) Slight Connectivity DCIA%=0.01*(IA %) ^ 2.0 Directly Connected Area= (DCIA ) (IC Acres) The Average Connectivity calculation was utilized in assessing the Town’s DCIA connectivity, based on the majority of land ut ilizing defined as agricultural and/or rural, minor residential communities, and minor - to - moderate commercial or industrialized areas. Based on the Average Connectivity calculations for each catchment , no catchments were identified with a connectivity of 11% or greater. Catchments were then prioritized utilizing the total urbanized area per catchment. Atlas was provided with a shapefile of the 2010 Urbanized Areas for the Town from the 2010 Census or Urban Classification , which was imported into ArcGIS for calculation purposes. Utilizing the Overlay - Intersect Tool, Atlas was able to extract the total Urbanized Area acreage per catchment, and then calculate the Urbanized area percentage per catchment utilizing the following formula: Based on these calculations, 28 catchments were identified with Urbanized Areas Urbanized Area (Ac.)/Basin Total Acreage*100 28 catchments containing impaired waterbodies were identified for the Town.
Page 197
19 Catchment Priority Rankings were conducted for all Sub - Basins in the Town. Multiple factors were taken into consideration when scoring each catchment, including but not limited to DCIA calculations, previous screening results, age of development/structures, density of generating sites, nearby sewer repairs, urbanized areas, and impaired waterbodies. 52 catchments were identified as Problem or High Priority. Specific criteria were utilizing in defining priority areas for the implementation of non - municipal retrofit projects. The criteria utilized in defining priority areas of non - municipal retrofit projects included High or Problem catchment priority rankings, catchments containing an impaired waterbody, and catchments identified with an urbanized area. Utilizing ArcGIS, Atlas extracted catchments where two (2) or more of the aforementioned criteria were found. Community outreach or project redevelopment is enc ouraged in these defined catchments. Describe plans for continuing the Retrofit program and how to achieve a goal of 1% DCIA disconnection annually in future years. (Due 7/1/22) The Stormwater Retrofit Program is designed to comply with Section (6) (B) (ii) of the CTDEEP 2017 - 2022 MS4 Permit. The Town of Granby will work towards disconnecting existing DCIA. The initial focus of the Stormwater Retrofit Program will first be applied to Town - owned properties, parks, and other facilities, followed by a focus of non - municipal facilities, parks, communities, or other redevelopments. Progress towards the DCIA disconnects will be tracked and continuously updated, with a goal to disconnect one percent (1%) of DCIA or to the MEP each year following the fifth year of th e MS4 permit.
Page 198
20
Part
II
:
Impaired waters investigation and monitoring
1.
I
mpaired waters investigation and monitoring program
For details on this requirement, visit
https://nemo.uconn.edu/2020/02/26/monitoring-
req
uirement
-
for
-
bacteria
-
impaired
-
waters/
. Refer to the yellow column of the Monitoring comparison chart and the Impaired waters
monitoring flowchart.
1.1
Indicate which stormwater pollutant(s) of concern occur(s) in your municipality or institution.
This data is available
on the MS4 map viewer:
http://s.uconn.edu/ctms4map
.
Nitrogen/ Phosphorus
Bacteria
Mercury
Other Pollutant of Concern
1.2
Describe
program status
2.
S
creening
data for
outfalls to impaired waterbodies
(Section 6(i
)
(1)
/ page 4
1)
2.1 Screening data
Complete the table below to report data for any wet weather sampling completed for MS4 outfalls that discharge
www.nemo.uconn.edu/ms4/tasks/monitoring.htm
. Refer to the yellow column of the Monitoring comparison chart
and the Impaired waters monitoring flowchart.
Each Annual Report will add on to the previous year’s data showing a cumulative list of sampling data.
You may
also attach
an excel spreadsheet
with the same data rather than copying it into this table
. If you do attach a
spreadsheet, please write “See Attachment” below.
See Attachment
II
Follow
-up investigation required (last column) if the following pollutant thresholds are exceeded:
Pollutant of concern
Pollutant threshold
Nitrogen
Total N > 2.5 mg/l
Phosphorus
Total P > 0.3 mg/l
Bacteria (fresh
waterbody)
•
E. coli > 235 col/100ml for swimming areas or 410 col/100ml for all others
•
Total Coliform > 500 col/100ml
Bacteria (salt waterbody)
•
Fecal Coliform > 31 col/100ml for Class SA and > 260 col/100ml for Class SB
Discuss 1) the status of
monitoring work completed, 2) a summary of the results and any notable findings, and 3) any changes to
the Stormwater Management Plan based on monitoring results.
W
et weather sampling at outfalls that discharge to impaired waterbodies
was completed in 2018 and in 2020. These results were
evaluated, and eight priority outfalls were selected. These priority outfalls have been sampled each year between 2020 and 20
24
. Wet
weather
samples were
analyzed for E. coli
and total coliform
.
Refer to
Attachment
II
for the documented wet weather screening and
priority outfall results. See
Figures
1-
6
for associated GIS maps related to monitoring.
Dry weather screening
has been completed for 166 of 185 outfalls. Dry weather inspections were completed for
59
outfalls
in 2024.
These screenings documented the condition of the outfalls, erosion control. Material subtype, and diameter of the outfalls. The condition
and erosion control of these outfalls and/or surrounding areas were ranked with the following descriptors: ex
cellent, good, fair, and poor.
Outfalls found with poor to fair conditions and/or erosion controls were recommended for repair or implementation of addition
a
l erosion
controls. Refer to
Attachment
s III and IV
for
the documented dry weather screenings.
Page 199
21 • Enterococci > 104 col/100ml for swimming areas or 500 col/100 for all others Other pollutants of concern Sample turbidity is 5 NTU > in - stream sample. 3. Follow - up investigations (Section 6(i)(1)(D) / page 43 ) Provide the following information for outfalls exceeding the pollutant threshold. Outfall ID Status of drainage area investigation Control measure to address impairment OF - 13 Initial investigation Investigation ongoing, possible agricultural sources of pollutants OF - 14 Initial investigation Investigation ongoing, possible agricultural sources of pollutants OF - 15 Initial investigation Investigation ongoing OF - 74 Initial investigation Investigation ongoing, possible agricultural sources of pollutants OF - 73 Initial investigation Investigation ongoing, possible agricultural sources of pollutants OF - 155 Initial investigation Investigation ongoing, possible agricultural sources of pollutants OF - 177 Initial investigation Investigation ongoing 4. Prioritized outfall monitoring (Section 6(i)(1)(D) / page 43) Once outfall sampling has been completed for at least 50% of outfalls to impaired waters, identify 6 of the highest contributors of any pollutants of concern. Begin monitoring these outfalls on an annual basis by July 1, 2021. You may also attach an excel spreadsheet with the same data rather than copying it to this table. If you do attach a spreadsheet, please write “See Attachment” below. See Attachment II for prioritized outfall monitoring results.
Page 200
22 Part I II : Additional IDDE Program Data 1. Assessment and Priority Ranking of Catchments data (Appendix B (A)(7)(c) / page 5) Provide a list of all catchments with ranking results (DEEP basins may be used instead of manual catchment delineations). See Attachment V for methodologies used for rank catchments. 1. Catchment ID (DEEP Basin ID) 2. Category 3. Rank 4001 - 00 - 1* Low Priority 4 4300 - 44 - 1 - L1 Problem 8 4309 - 00 - 1 Low Priority 3 4309 - 01 - 1 High Priority 10 4309 - 02 - 1 Low Priority 3 4319 - 00 - 2 - R1 High Priority 16 4319 - 00 - 2 - R2 High Priority 14 4319 - 00 - 3 - R1 Problem 7 4319 - 00 - 3 - R2 Problem 8 4319 - 00 - 3 - R3 Low Priority 5 4319 - 00 - 3 - R4 Problem 8 4319 - 00 - 3 - R5 High Priority 19 4319 - 00 - 3 - R6 High Priority 12 4319 - 02 - 1 Problem 8 4319 - 03 - 2 - R1 Low Priority 2 4319 - 03 - 2 - R2 Problem 9 4319 - 04 - 1 Problem 9 4319 - 05 - 1 Problem 8 4319 - 06 - 1 Low Priority 4 4319 - 07 - 1 Problem 8 4319 - 08 - 1 Problem 8 4319 - 09 - 1 Problem 7 4319 - 10 - 2 - L1 Problem 9 4319 - 10 - 2 - L2 Low Priority 2 4319 - 10 - 2 - R1 Low Priority 2 4319 - 11 - 1 Low Priority 3 4320 - 00 - 1 Low Priority 3 4320 - 00 - 2 - R1 Low Priority 5 4320 - 00 - 2 - R2 Problem 6 4320 - 00 - 2 - R3 Problem 5 4320 - 00 - 2 - R4 Problem 4 4320 - 00 - 3 - L1 Problem 8 4320 - 00 - 3 - R1 Problem 7 4320 - 00 - 3 - R2 Problem 9 4320 - 00 - 3 - R3 High Priority 8 4320 - 00 - 3 - R4 Problem 8 4320 - 00 - 3 - R5 High Priority 16
Page 201
23 4320 - 00 - 3 - R6 Problem 9 4320 - 00 - 4 - R1 High Priority 16 4320 - 00 - 4 - R2 Problem 8 4320 - 00 - 4 - R3 Problem 6 4320 - 00 - 4 - R4 Low Priority 3 4320 - 01 - 1 Problem 7 4320 - 02 - 1 Problem 8 4320 - 03 - 1 High Priority 11 4320 - 04 - 1 Problem 7 4320 - 05 - 2 - R1 Low Priority 3 4320 - 05 - 2 - R2 High Priority 10 4320 - 07 - 1 Low Priority 3 4320 - 08 - 1 Problem 6 4320 - 09 - 1 High Priority 11 4320 - 10 - 1 High Priority 12 4320 - 10 - 2 - R1 Low Priority 5 4320 - 11 - 1 Problem 7 4320 - 12 - 1 High Priority 12 4320 - 12 - 2 - R1 Low Priority 2 4320 - 13 - 1 Problem 9 4320 - 13 - 1 - L1 High Priority 13 4320 - 14 - 1 High Priority 13 4320 - 15 - 2 - R1 High Priority 10 4320 - 15 - 3 - R1 High Priority 12 4320 - 16 - 1 Problem 10 4320 - 17 - 1 High Priority 12 4320 - 17 - 2 - R1 Problem 6 4320 - 17 - 3 - R1 Low Priority 3 4320 - 21 - 1 Problem 4 4320 - 21 - 1 - L1 Problem 8 4320 - 22 - 1 Problem 9 4320 - 26 - 1 - L1 Problem 9 2. Outfall and Interconnection Screening and Sampling data (Appendix B (A)(7)(d) / page 7) 2.1 Dry weather screening and sampling data from outfalls and interconnections For details on this requirement, visit https://nemo.uconn.edu/2020/02/26/monitoring- requirement - for - bacteria - impaired - waters/ . Refer to the blue column of the Monitoring comparison chart and the IDDE baseline monitoring flowchart. Provide sample data for outfalls where flow is observed. Only include Pollutant of concern data for outfalls that discharge i n to stormwater impaired waterbodies. You may also attach an excel spreadsheet with the same data rather than copying it to this table. If you do attach a spreadsheet, please write “See Attachment” below. 2.2 Wet weather sample and inspection data
Page 202
24 For details on this requirement, visit https://nemo.uconn.edu/2020/02/26/monitoring- requirement - for - bacteria - impaired - waters/ . Refer to the green column of the Monitoring comparison chart and the IDDE catchment investigation flowchart. Provide sample data for outfalls and key junction manholes of any catchment area with at least one System Vulnerability Facto r. You may also attach an excel spreadsheet with the same data rather than copying it to this table. If you do attach a spreadsheet, please write “See Attachment” below. 1. Catchment Investigation data (Appendix B (A)(7)(e) / page 9) For details on this requirement, visit www.nemo.uconn.edu/ms4/tasks/monitoring.htm . Refer to the green column of the Monitoring comparison chart and the IDDE catchment investigation flowchart. 90% All catchments (utilizing basins for assessment purposes), have been ranked and prioritized. 3.1 System Vulnerability Factor Summary For those catchments being investigated for illicit discharges (i.e., categorized as high priority, low priority, or problem) document the presence or absence of System Vulnerability Factors (SVF). If present, report which SVF’s were identified. An example is provided below. Where SVFs are: 1. History of SSOs, including, but not limited to, those resulting from wet weather, high water table, or fat/oil/grease blockages . 2. Sewer pump/lift stations, siphons, or known sanitary sewer restrictions where power/equipment failures or blockages could rea dily result in SSOs. 3. Inadequate sanitary sewer level of service (LOS) resulting in regular surcharging, customer back - ups, or frequent customer complaints. 4. Common or twin - invert manholes serving storm and sanitary sewer alignments. 5. Common trench construction serving both storm and sanitary sewer alignments. 6. Crossings of storm and sanitary sewer alignments. 7. Sanitary sewer alignments known or suspected to have been constructed with an underdrain system; 8. Sanitary sewer infrastructure defects such as leaking service laterals, cracked, broken, or offset sanitary infrastructure, d irectly piped connections between storm drain and sanitary sewer infrastructure, or other vulnerability factors identified through Inflow/Infiltration Analyses, Sanitary Sewer Evaluation Surveys, or other infrastructure investigations. 9. Areas formerly served by combined sewer systems. 10. Any sanitary sewer and storm drain infrastructure greater than 40 years old in medium and densely developed areas. 11. Widespread code - required septic system upgrades required at property transfers (indicative of inadequate soils, water table separation, or ot her physical constraints of the area rather that poor owner maintenance) . 12. History of multiple local health department or sanitarian actions addressing widespread septic system failures (indicative of inadequate soils, water table separation, or other physical constraints of the area rather that poor owner maintenance) . 3.2 Key junction manhole dry weather screening and sampling data You may also attach a n excel spreadsheet with the same data rather than copying it to this table . If you do attach a spreadsheet, please write “See Attachment” below. Key Junction Manhole ID Latitude / Longitude Screening / Sample date Visual/ olfactory evidence of illicit discharge Ammonia Chlorine Surfactants
Page 203
25 The identification of key junction manholes that may narrow the location of suspected illicit discharges or SSOs to an isolated pipe segment between two manholes, or key junction manholes that may be located or show evidence of illicit discharges or SSOs tha t may not be evident at the outfall under all circumstances, or to confirm or identify potential system vulnerability factors is underway. Once identified, these key junction manholes will be inspected during dry weather events for evidence of illicit discharges or SSOs. 3.3 Wet weather inve stigation outfall sampling data You may also attach an excel spreadsheet with the same data rather than copying it to this table. If you do attach a spreadsheet, please write “See Attachment” below. Outfall ID Latitude / Longitude Sample date Ammonia Chlorine Surfactants Following the identification of key junction manholes during dry weather inspections, follow - up wet weather sampling will be completed where inspections indicate the presence of one or mor e SVF, SSO, or illicit discharge . 3.4 Data for each illicit discharge source confirmed through the ca tchment investigation procedure. Discharge location Source location Discharge description Method of discovery Date of discovery Date of eliminatio n Mitigation or enforcement action Estimated volume of flow removed 286 W. Granby Rd (OF - 152) Undergroud spring Atlas was called to investigate a potential illicit discharge in the Town. Upon arrival, water was found to be discharging from a driveway at a steady, bubbling rate, with heavy algae growth. Discharge lead down the driveway into an adjacent ditch. This runoff disch arge is in the vicinity of OF - 152, which in turn discharges to the West Branch Salmon Brook. A sample of the discharge was submitted for the analysis of E. coli , T. coli, nitrite, nitrate, and phosphorus to assess potential illicit discharge sour ces. A review of sampling data from the nearby MS4 outfall (OF - 152) did not indicate illicit discharges were entering this catchment. Laboratory analytical results were indicative of groundwater, and it is suspected an underground spring had worked its way to the surface. Citizen report 4/7/ 20 21 N/A None. N/A 80 Canal Road Residential sump pump A sump pump discharging to the road and running into a nearby catch basin , which in turn lead to icy road conditions, was reported. Citizen report 2022 2022 Following investigation, the Town required the resident to relocate the sump pump discharge, which was complied with. Unknown.
Page 204
26 Discharge location Source location Discharge description Method of discovery Date of discovery Date of eliminatio n Mitigation or enforcement action Estimated volume of flow removed Moose h or n Road Washout from shared gravel driveway It appears that silt, sediment, and gravel from the driveway entered the Town’s MS4 system and an adjacent stream and can therefore be considered an illicit discharge. Washout from the shared driveway at 30, 31, 33, and 54 Moose h orn Road was determined to have been the cause of the discharge. No corrective action has been done at this time. Citizen report 7/18/2023 7/21/2023 None. Unknown.
Page 205
Page 206
FIGURES
Page 207
0 3,000 6,000 9,000 12,000 --====----=======---- ■ Feet East artland • • 0 <9. ¾ Legend � CJ CJ Outfall Catch Basin Stormwater Manhole Impaired Waterbody Surface Water � .- % ! " .. � � 'r: • l /- -- � ;I lb. "/'___,. I • ---.. - cl ' - \:r _,_ , .. . , ,: ii -:::,..; < ..._J, I s, .J,, ,,, }:-¼3 • � '7 � � - J . � ,. <f- � � " 1 Main Road Town-Owned Land Parcel Town Line I" C C. -, Ber .:r -, -: j Gillett h; - � Corner Congamond Gran brook Park Simsbury Tri-Town Airport Esri, HERE, Garmin, SafeGraph, Geo Technologies, Inc, A'!f-lkj�� SA, USGS, EPA NPS, USDA . f Tan Fire town Town of Granby 2024 Annual Report MS4 System
Page 208
0 3,000 6,000 9,000 12,000 --====----=======---- ■ Feet East artland • • ■ 0 <9. ¾ Legend � CJ Priority Outfalls Outfall Catch Basin Stormwater Manhole Impaired Waterbody c:::J � .- % ! " .. � � 'r: • l /- -- � ;I lb. "/'___,. I • ---.. - cl ' - \:r _,_ , .. . , ,: ii -:::,..; < ..._J, I s, .J,, ,,, }:-¼3 • � '7 � � - J . � ,. <f- � � " 1 Su r face Water Main Road Town-Owned Land Parcel Town Line I" C. -, -: j .:r -, h; - � Gillett Corner Congamond Gran brook Park Simsbury Tri-Town Airport C Ber Esri, HERE, Garmin, SafeGraph, Geo Technologies, Inc, A'!f-lkj�� SA, USGS, EPA NPS, USDA . f Tan Fire town Town of Granby 2024 Annual Report Priority Outfalls
Page 209
0 12,000 --====----=======---- ■ Feet 3,000 6,000 9,000 East artland Legend 1111 Catchment Impaired Waterbody Surface Water Main Road � Town-Owned Land CJ Parcel CJ Town Line Gillett Corner Congamond Gran brook Park Simsbury Tri-Town Airport C Ber Esri, HERE, Garmin, SafeGraph, Geo Technologies, Inc, A'!f-lkj�� SA, USGS, EPA NPS, USDA . f Tan Fire town Town of Granby 2024 Annual Report Impaired Waters by Catchment
Page 210
0 3,000 6,000 9,000 12,000 --====----=======---- ■ Feet East artland 1111 ... ■ 0 <9. ¾ Legend � CJ Ur b anized Area Outfall Catch Basin Stormwater Manhole Impaired Waterbody c:::J � .- % ! " .. � � 'r: • l /- -- � ;I lb. "/'___,. I • ---.. - cl ' - \:r _,_ , .. . , ,: ii -:::,..; < ..._J, I s, .J,, ,,, }:-¼3 • � '7 � � - J . � ,. <f- � � " 1 Su rface Water Main Road Town-Owned Land Parcel Town Line I" C. -, -: j .:r -, h; - � Gillett Corner Congamond Gran brook Park Simsbury Tri-Town Airport C Ber Esri, HERE, Garmin, SafeGraph, Geo Technologies, Inc, A'!f-lkj�� SA, USGS, EPA NPS, USDA . f Tan Fire town Town of Granby 2024 Annual Report Urbanized Areas by Catchment
Page 211
0 12,000 --===::::::.---=======---- ■ Feet 3,000 6,000 9,000 East artland Legend 1111 Catchment Impaired Waterbody Surface Water Main Road � Town-Owned Land CJ Parcel CJ Town Line Gillett Corner Congamond Gran brook Park Simsbury Tri-Town Airport C Ber Esri, HERE, Garmin, SafeGraph, Geo Technologies, Inc, A'!f-lkj�� SA, USGS, EPA NPS, USDA . f Tan Fire town Town of Granby 2024 Annual Report Prioritized Retrofitting by Catchment
Page 212
0 12,000 --===::::::.---=======---- ■ Feet 3,000 6,000 9,000 East artland � CJ 4319-03-2-R2 431'}-11-1 4320-03-1 4320-05-2-R2 4320-08-1 4319-09-1 \\, Legend c::::J Town Line Priority Ranking CJ CJ Impaired Waterbody Surface Water Main Road Town-Owned Land Parcel CJ High Priority Low Priority Problem / 432 4001 0-1* 4320-17-1 Five Poin s 320-1f-1 \ � 4320-00-3-RS Breok Gillett Corner Congamond 4320-00-4-Rl � 319-00- 3-R6 Gran brook Park Simsbury Tri-Town Airport C Ber Esri, HERE, Garmin, SafeGraph, Geo Technologies, Inc, A'!f-lkj�� SA, USGS, EPA NPS, USDA . f Tan Fire town Town of Granby 2024 Annual Report Catchment Priority Rankings
Page 213
SEPTIC REPAIR AND REPLACMENT
Page 214
E. Coli (MPN/100mL) Total Coliform (MPN/100mL) OF-13 9/10/2018 Bacteria 20 >24,200 Phoenix Environmental Yes -72.784375 41.9578399 OF-14 9/10/2018 Bacteria >24,200 >24,200 Phoenix Environmental Yes -72.780682 41.9570748 OF-15 9/10/2018 Bacteria 269 >24,200 Phoenix Environmental Yes -72.77988 41.955557 OF-73 9/10/2018 Bacteria 6,870 >24,200 Phoenix Environmental Yes -72.821732 41.9901248 OF-74 9/10/2018 Bacteria 13,000 >24,200 Phoenix Environmental Yes -72.820082 41.9842248 OF-102 9/10/2018 Bacteria 9,210 >24,200 Phoenix Environmental Yes -72.806849 41.9815081 OF-103 9/10/2018 Bacteria 12,000 >24,200 Phoenix Environmental Yes -72.805525 41.9702553 OF-104 9/10/2018 Bacteria 4,880 >24,200 Phoenix Environmental Yes -72.804936 41.9703202 OF-105 9/10/2018 Bacteria 9,210 >24,200 Phoenix Environmental Yes -72.80428 41.9703214 OF-13 12/28/2018 Bacteria 4,110 7,270 Phoenix Environmental Yes -72.784375 41.9578399 OF-14 12/28/2018 Bacteria >24,200 >24,200 Phoenix Environmental Yes -72.780682 41.9570748 OF-15 12/28/2018 Bacteria 10 8,660 Phoenix Environmental Yes -72.77988 41.955557 OF-44 12/28/2018 Bacteria 10 2,910 Phoenix Environmental Yes -72.835466 41.9501248 OF-73 12/28/2018 Bacteria 256 9,210 Phoenix Environmental Yes -72.821732 41.9901248 OF-74 12/28/2018 Bacteria 10 17,300 Phoenix Environmental Yes -72.820082 41.9842248 OF-86 12/28/2018 Bacteria 10 1,620 Phoenix Environmental Yes -72.834279 41.9418247 OF-102 12/28/2018 Bacteria 41 1,790 Phoenix Environmental Yes -72.806849 41.9815081 OF-103 12/28/2018 Bacteria 120 5,480 Phoenix Environmental Yes -72.805525 41.9702553 OF-104 12/28/2018 Bacteria 10 14,100 Phoenix Environmental Yes -72.804936 41.9703202 OF-105 12/28/2018 Bacteria 10 >2,610 Phoenix E nvir onmental Yes -72.80428 41.9703214 OF-109 12/28/2018 Bacteria 433 17,300 Phoenix Environmental Yes -72.871866 41.9738414 OF-152 12/28/2018 Bacteria 10 1,840 Phoenix Environmental Yes -72.843599 41.9558581 OF-153 12/28/2018 Bacteria 10 8,160 Phoenix Environmental Yes -72.843416 41.9551414 OF-154 12/28/2018 Bacteria 20 305 Phoenix Environmental Yes -72.841149 41.9533081 OF-155 12/28/2018 Bacteria 20 11,200 Phoenix Environmental Yes -72.837582 41.9490248 OF-103/104 12/28/2018 Bacteria 216 4,350 Phoenix Environmental Yes -72.805525 41.9702553 Stream 3/19/2020 Bacteria 201 2,490 Phoenix Environmental Yes -- -- OF-103/104 3/19/2020 Bacteria 31 1,920 Phoenix Environmental Yes -72.805525 41.9702553 Stream 3/19/2020 Bacteria 563 17,300 Phoenix Environmental Yes -- -- OF-102 3/19/2020 Bacteria <10 8,660 Phoenix Environmental Yes -72.806849 41.9815081 2020 Town of Granby 2018-2024 Results Outfall ID Inspection Date Pollutant Parameter (Nitrogen, Phosphorous, Bacteria, Other) Laboratory Follow-Up Required? Longitude Latitude Wet Weather Sampling 2018 Outfalls to Impaired Waterbodies
Page 215
E. Coli (MPN/100mL) Total Coliform (MPN/100mL) Town of Granby 2018-2024 Results Outfall ID Inspection Date Pollutant Parameter (Nitrogen, Phosphorous, Bacteria, Other) Laboratory Follow-Up Required? Longitude Latitude Wet Weather Sampling Outfalls to Impaired Waterbodies OF-103 3/19/2020 Bacteria 798 19,900 Phoenix Environmental Yes -72.805525 41.9702553 OF-104 3/19/2020 Bacteria 20 12,000 Phoenix Environmental Yes -72.804936 41.9703202 OF-14 3/19/2020 Bacteria 10 3,650 Phoenix Yes -72.780682 41.9570748 OF-153 3/19/2020 Bacteria 10 13,000 -72.84341555 41.95514142 OF-15 3/19/2020 Bacteria 233 14,100 -72.77987999 41.95555698 OF-13 3/19/2020 Bacteria 20 3,650 -72.78437469 41.95783989 OF-86 3/19/2020 Bacteria <10 6,490 -72.83427937 41.94182471 OF-74 3/19/2020 Bacteria 20 8,660 -72.82008222 41.98422475 OF-73 3/19/2020 Bacteria 20 4,880 -72.82173222 41.99012475 OF-109 3/19/2020 Bacteria 2,480 4,110 -72.87186554 41.97384142 OF-155 3/19/2020 Bacteria 249 2,600 -72.83758222 41.94902476 OF-152 9/10/2020 Bacteria 5,790 >24,200 -72.84359888 41.95585809 OF-44 9/10/2020 Bacteria 110 7,270 -72.83546555 41.95012476 OF-14 9/10/2020 Bacteria 173 >24,200 -72.78068224 41.95707475 OF-15 9/10/2020 Bacteria 389 >24,200 -72.77987999 41.95555698 OF-73 9/10/2020 Bacteria 860 >24,200 -72.82173222 41.99012475 OF-74 9/10/2020 Bacteria 122 >24,200 -72.82008222 41.98422475 OF-102 9/10/2020 Bacteria 30 >24,200 -72.80684889 41.98150808 OF-103 9/10/2020 Bacteria 74 >24,200 -72.80552466 41.97025533 OF-104 9/10/2020 Bacteria 20 >24,200 -72.80493613 41.9703202 OF-153 3/19/2020 Bacteria 10 13,000 Phoenix Environmental Yes -72.77988 41.955557 OF-15 3/19/2020 Bacteria 233 14,100 Phoenix Environmental Yes -72.784375 41.9578399 OF-13 3/19/2020 Bacteria 20 3,650 Phoenix Environmental Yes -72.834279 41.9418247 OF-86 3/19/2020 Bacteria <10 6,490 Phoenix Environmental Yes -72.820082 41.9842248 OF-74 3/19/2020 Bacteria 20 8,660 Phoenix Environmental Yes -72.821732 41.9901248 OF-73 3/19/2020 Bacteria 20 4,880 Phoenix Environmental Yes -72.871866 41.9738414 OF-109 3/19/2020 Bacteria 2,480 4,110 Phoenix Environmental Yes -72.837582 41.9490248 OF-155 3/19/2020 Bacteria 249 2,600 Phoenix E nvir onmental Yes -72.843599 41.9558581 OF-152 9/10/2020 Bacteria 5,790 >24,200 Phoenix Environmental Yes -72.835466 41.9501248 OF-44 9/10/2020 Bacteria 110 7,270 Phoenix Environmental Yes -72.780682 41.9570748 OF-14 9/10/2020 Bacteria 173 >24,200 Phoenix Environmental Yes -72.77988 41.955557 2020
Page 216
E. Coli (MPN/100mL) Total Coliform (MPN/100mL) Town of Granby 2018-2024 Results Outfall ID Inspection Date Pollutant Parameter (Nitrogen, Phosphorous, Bacteria, Other) Laboratory Follow-Up Required? Longitude Latitude Wet Weather Sampling Outfalls to Impaired Waterbodies OF-15 9/10/2020 Bacteria 389 >24,200 Phoenix Environmental Yes -72.821732 41.9901248 OF-73 9/10/2020 Bacteria 860 >24,200 Phoenix Yes -72.820082 41.9842248 OF-74 9/10/2020 Bacteria 122 >24,200 Phoenix Environmental Yes -72.806849 41.9815081 OF-102 9/10/2020 Bacteria 30 >24,200 Phoenix Environmental Yes -72.805525 41.9702553 OF-103 9/10/2020 Bacteria 74 >24,200 Phoenix Environmental Yes -72.804936 41.9703202 OF-104 9/10/2020 Bacteria 20 >24,200 Phoenix Environmental Yes -72.804936 41.9703202 OF-14 9/1/2021 Bacteria 813 >24,200 Phoenix Environmental Yes -72.780682 41.9570748 OF-15 9/1/2021 Bacteria 1,430 >24,200 Phoenix Environmental Yes -72.77988 41.955557 OF-73 9/1/2021 Bacteria 24,200 >24,200 Phoenix Environmental Yes -72.821732 41.9901248 OF-74 9/1/2021 Bacteria 1,400 >24,200 Phoenix Environmental Yes -72.820082 41.9842248 OF-102 9/1/2021 Bacteria 1,790 >24,200 Phoenix Environmental Yes -72.806849 41.9815081 OF-103 9/1/2021 Bacteria 3,450 >24,200 Phoenix Environmental Yes -72.805525 41.9702553 OF-104 9/1/2021 Bacteria 2,380 >24,200 Phoenix Environmental Yes -72.804936 41.9703202 OF-105 9/1/2021 Bacteria 7,700 >24,200 Phoenix Environmental Yes -72.80428 41.9703214 OF-14 9/22/2022 Bacteria >24,200 >24,200 Phoenix Environmental Yes -72.780682 41.9570748 OF-15 8/22/2022 Bacteria 17,300 >24,200 Phoenix Environmental Yes -72.77988 41.955557 OF-73 9/22/2022 Bacteria >24,200 >24,200 Phoenix Environmental Yes -72.821732 41.9901248 OF-74 8/22/2022 Bacteria 712 >24,200 Phoenix Environmental Yes -72.820082 41.9842248 OF-102 8/22/2022 Bacteria >24,200 >24,200 Phoenix Environmental Yes -72.806849 41.9815081 OF-103 9/22/2022 Bacteria 6,130 >24,200 Phoenix Environmental Yes -72.805525 41.9702553 OF-104 8/22/2022 Bacteria >24,200 >24,200 Phoenix Environmental Yes - 72.804936 41.9703202 OF-105 8/22/2022 Bacteria 9,210 >24,200 Phoenix Environmental Yes -72.80428 41.9703214 OF-14 8/25/2023 Bacteria 4,880 >24,000 Phoenix Environmental Laboratories, Inc. Yes -72.780682 41.9570748 OF-15 8/25/2023 Bacteria 1,290 >24,000 Phoenix Environmental Laboratories, Inc. Yes -72.77988 41.955557 OF-102 8/25/2023 Bacteria 2,010 >24,000 Phoenix Environmental Laboratories, Inc. Yes -72.806849 41.9815081 OF-103 8/25/2023 Bacteria 2,610 >24,000 Phoenix Environmental Laboratories, Inc. Yes -72.805525 41.9702553 2023 2021 2020 2022
Page 217
E. Coli (MPN/100mL) Total Coliform (MPN/100mL) Town of Granby 2018-2024 Results Outfall ID Inspection Date Pollutant Parameter (Nitrogen, Phosphorous, Bacteria, Other) Laboratory Follow-Up Required? Longitude Latitude Wet Weather Sampling Outfalls to Impaired Waterbodies OF-104 8/25/2023 Bacteria 19,900 >24,000 Phoenix Environmental Laboratories, Inc. Yes -72.804936 41.9703202 OF-150 8/25/2023 Bacteria 11,200 >24,000 Phoenix Environmental Laboratories, Inc. Yes -72.80428 41.9703214 OF-14 9/18/2023 Bacteria 19,900 >24,200 Phoenix Environmental Laboratories, Inc. Yes -72.780682 41.9570748 OF-15 9/18/2023 Bacteria 2,920 >24,200 Phoenix Environmental Laboratories, Inc. Yes -72.77988 41.955557 OF-73 9/18/2023 Bacteria 520 >24,200 Phoenix Environmental Laboratories, Inc. Yes -72.821726 41.990151 OF-74 9/18/2023 Bacteria 1,970 >24,200 Phoenix Environmental Laboratories, Inc. Yes -72.820065 41.984247 OF-102 9/18/2023 Bacteria 1,990 >24,200 Phoenix Environmental Laboratories, Inc. Yes -72.806849 41.9815081 OF-103 9/18/2023 Bacteria 24,200 >24,200 Phoenix Environmental Laboratories, Inc. Yes -72.805525 41.9702553 OF-104 9/18/2023 Bacteria 842 >24,200 Phoenix Environmental Laboratories, Inc. Yes -72.804936 41.9703202 OF-105 9/18/2023 Bacteria 6,490 >24,200 Phoenix Environmental Laboratories, Inc. Yes -72.80428 41.9703214 OF-14 11/21/2024 Bacteria 155 >24,200 Phoenix Environmental Laboratories, Inc. Yes -72.780682 41.9570748 OF-15 11/21/2024 Bacteria 3,650 >24,200 Phoenix Environmental Laboratories, Inc. Yes -72.77988 41.955557 OF-73 11/21/2024 Bacteria 144 5,790 Phoenix Environmental Laboratories, Inc. Yes -72.821726 41.990151 OF-74 11/21/2024 Bacteria 109 >24,200 Phoenix Environmental Laboratories, Inc. Yes -72.820065 41.984247 OF-102 11/21/2024 Bacteria >24,200 >24,200 Phoenix Environmental Laboratories, Inc. Yes -72.806849 41.9815081 OF-103 11/21/2024 Bacteria 213 >24,200 Phoenix Environmental Laboratories, Inc. Yes -72.805525 41.9702553 OF-104 11/21/2024 Bacteria 231 >24,200 Phoenix Environmental Laboratories, Inc. Yes -72.804936 41.9703202 OF - 109 11/21/2024 Bacteria >17,300 >24,200 Phoenix Environmental Laboratories, Inc. Yes -72.871866 41.973841 2023 2024 *Highlighting is based on the following criteria; * All highlighted bacterial concentrations are required for follow-up investigations. Notes: 2. Total Coliform > 500 col/100mL 1. E. Coli >235/100mL for Swimming Areas, and >410 col/100mL for all others.
Page 218
WET WEATHER SAMPLING OUFALLS TO IMPAIRED WATERBODIES
Page 219
Method used to Track Septic Repairs/Replacements Address Reason for Evaluation/Replacement Actions Taken Impacted Waterbody or Watershed Department Responsible Farmington Valley Health District (FVHD) 3 Hampton Village Drive Unknown Septic tank replacement only. None FVHD Farmington Valley Health District (FVHD) 15 Woodland Drive Unknown Full system replacement. None FVHD Farmington Valley Health District (FVHD) 176 Lost Acres Road Unknown Full system replacement. None FVHD Farmington Valley Health District (FVHD) 18 Kearns Circle Unknown Full system replacement. None FVHD Farmington Valley Health District (FVHD) 32 Zimmer Road Unknown Full system replacement. None FVHD Farmington Valley Health District (FVHD) 210 Barn Door Hills Road U nknown Soil testing done. None FVHD Farmington Valley Health District (FVHD) 250 Barkhamstead Road Overflow Soil testing done. None FVHD Farmington Valley Health District (FVHD) 109 Bushy Hill Road Unknown Full system replacement. None FVHD Farmington Valley Health District (FVHD) 17 Stardust Drive Unknown Soil testing done. None FVHD Farmington Valley Health District (FVHD) 22R Intervale Unknown Septic tank replacement only. None FVHD Farmington Valley Health District (FVHD) 330 North Granby Road Unknown Full system replacement. None FVHD Farmington Valley Health District (FVHD) 24 Heather Lane Unknown Septic tank replacement only. None FVHD Farmington Valley Health District (FVHD) 6 Pine Hill Road Unknown Septic tank replacement only. None FVHD Farmington Valley Health District (FVHD) 189 Day Street Unknown Soil testing done. None FVHD Farmington Valley Health District (FVHD) 58 Barn Door Hills Road Unknown Septic tank replacement only. None FVHD Farmington Valley Health District (FVHD) 473 Salmon Brook Street Unknown Full system replacement. None FVHD Farmington Valley Health District (FVHD) 4 Pond Lane Unknown Septic tank replacement only. None FVHD Farmington Valley Health District (FVHD) 63 Higley Road Unknown Septic tank replacement only. None FVHD Farmington Valley Health District (FVHD) 39 Strong Road Unknown Full system replacement. None FVHD Farmington Valley Health District (FVHD) 96 West Granby Road Unknown Septic tank replacement only. None FVHD Farmington Valley Health District (FVHD) 68 Canal Road Unknown Septic tank replacement only. None FVHD Farm ington Valley Health Di strict (FVHD) 11 Rondure Road Unknown Septic tank replacement only. None FVHD Farmington Valley Health District (FVHD) 146 North Granby Road Unknown Soil testing done. None FVHD Farmington Valley Health District (FVHD) 22 Pendleton Road Unknown Septic tank replacement only. None FVHD Farmington Valley Health District (FVHD) 20 Peterson Road Unknown Full system replacement. None FVHD Farmington Valley Health District (FVHD) 35 Shelley Drive Unknown Full system replacement. None FVHD Farmington Valley Health District (FVHD) 5 Nestor Way Unknown Full system replacement. None FVHD Town of Granby Septic Repair and Replacement 2023-2024 2023
Page 220
Method used to Track Septic Repairs/Replacements Address Reason for Evaluation/Replacement Actions Taken Impacted Waterbody or Watershed Department Responsible Town of Granby Septic Repair and Replacement 2023-2024 Farmington Valley Health District (FVHD) 45 East Granby Road Leach field failing, system 50+ years old. Full system replacement. None FVHD Farmington Valley Health District (FVHD) 68 Kelly Lane Strong odor when it rained, leaching field failing. Full system replacement. None FVHD Farmington Valley Health District (FVHD) 24 Simmer Road Age of septic system (tank). Septic tank replacement only. None FVHD Farmington Valley Health District (FVHD) 3 Douglas Drive Flooded system. Full system replacement. None FVHD Farmington Valley Health District (FVHD) 14 Harvey Drive Increase capacity of drainage field. Full system replacement. None FVHD Farmington Valley Health District (FVHD) 154 Canton Road Following a septif insepction (2023) that recommended tank replacement. Full system replacement. None FVHD Farmington Valley Health District (FVHD) 18 Old Simsbury Road . Corrosion and cracks on tank . Septic tank replacement only. None FVHD Farmington Valley Health District (FVHD) 35 Cooley Road Leaching field failing, ponding observed with effluent. Full system replacement. None FVHD Farmington Valley Health District (FVHD) 220 Broad Hill Road Age of septic system. Full system replacement. None FVHD Farmington Valley Health District (FVHD) 1 East View Drive Unknown Full system replacement. None FVHD Farmington Valley Health District (FVHD) 511 Salmon Brook Street Real-estate Inspection Full system replacement. None FVHD Farmington Valley Health District (FVHD) 9 Morningside Drive Age of septic system. Full system replacement. None FVHD Farmington Valley Health District (FVHD) 10 Wells Road New house addition. Septic pipe replacement. None FVHD Farmington Valley Health District (FVHD) 31 East Street Tank cracked. Septic tank replacement only. None FVHD Farmington Valley Health District (FVHD) 22 High ridge Connect addition to existing tank Septic pipe replacement. None FVHD Farmington Valley Health District (FVHD) 85 Higley Road Age of septic system. Full system replacement. None FVHD Farmington Valley Health District (FVHD) 15 Basile Road Tank cracked. Septic tank replacement only. None FVHD Farmington Valley Health District (FVHD) 19 Intervale Road Age of septic system. Septic tank replacement only. None FVHD Farmington Valley Health District (FVHD) 18 Candlewood Lane Failed inspection Septic tank replacement only. None FVHD Farmington Valley Health District (FVHD) 52 Spring Glen Road Existing plastic tank damaged. S e ptic tank replacement only. None FVHD Farmington Valley Health District (FVHD) 14 Old Simsbury Road Failed inspection. Septic tank replacement only. None FVHD Farmington Valley Health District (FVHD) 122 East Street Septic system repair evaluation Septic repair evaluation – replace tank. None FVHD Farmington Valley Health District (FVHD) 24 Pendelton Road Old metal tank collapsed. Septic tank replacement only. None FVHD Farmington Valley Health District (FVHD) 45 Barkhamsted Road Failed inspection Septic repair evaluation – replace tank. None FVHD Farmington Valley Health District (FVHD) 57 Silkey Road Age of septic system. Evaluated for septic system repair None FVHD Farmington Valley Health District (FVHD) 11 Brianwood Drive Failed inspection. Evaluated for septic system repair None FVHD 2024
Page 221
DRY WEATHER INSPECTIONS
Page 222
Number Outfall ID Inspection Date Material Subtype Diameter (Inches) Condition Erosion Control Notes Illicit Discharge Illicit Discharge Flow Type Illicit Discharge Description Sample Collection Longitude Latitude 1 OF-104 (1103) 8/23/2018 HDPE Pipe 24 Good Good Riprap on enbankment. Observed low flow with clear discahrge. Good erosion control. No -- -- -- -72.804936 41.97032 2 OF-105 (1107) 8/23/2018 Concrete Flared End 15 Poor Poor Observed low flow with clear discahrge. Road near outfall is eroding No -- -- -- -72.80428 41.970321 3 OF-103 (1102) 8/23/2018 HDPE Flared End 24 Good Good Riprap on enbankment. Observed low flow with clear discahrge. Good erosion control. No -- -- -- -72.805525 41.970255 4 OF-172 (1748) 8/23/2018 Concrete Pipe 15 Good Good Concrete pipe to rip rap, good erosion control. Dry observed receiving stream to be dry as well. No -- -- -- -72.802716 41.983125 5 OF- 171 (1744) 8/23/2018 -- -- -- -- -- Outfall loacted on residential property. Did not access outfall. No -- -- -- -72.803066 41.983975 6 OF-102 (1099) 8/23/2018 HDPE Pipe 24 Good Good Two 4' pipes inserted into wall on bridge over Salmon Brook. Dry with adeqyate erosion control. No -- -- -- -72.806849 41.981508 7 OF-74 (781) 8/23/2018 -- -- -- -- -- Unable to locate outfall. Located on a farm that likely uses manure as fertilizer. No -- -- -- -72.820082 41.984225 8 OF-73 (776) 8/23/2018 Concrete Flared End 15 Fair Fair No discharge observed during inspection. Outfall partially clogged. Some erosion controll (stones) present. Direct discharge to Dismal Brook. No -- -- -- -72.821732 41.990125 9 OF-13 (190) 8/23/2018 Concrete Pipe -- Good Good No discharge observed during inspection. Outfall imbedded in mason wall. No -- -- -- -72.784375 41.95784 10 OF-14 (195) 8/23/2018 Corrugated Metal Pipe -- Fair Fair Some erosion control present, no rip-rap. Heavily covered in vegetation. No -- -- -- -72.780682 41.957075 11 OF-15 (198) 8/23/2018 Concrete Pipe 15 Fair Fair Directly discharges into Salmon Brook. No -- -- -- -72.77988 41.955557 12 OF-152 3/27/2020 -- -- -- Poor Poor Outfall clogged with leaves. No -- -- -- -72.843478 41.954902 13 OF-103 (1102) 3/27/2020 HDPE Pipe 24 Good Good Overall good condition, discharges directly into surface water body No -- -- -- -72.805525 41.970255 14 OF-104 (1103) 3/27/2020 HDPE Pipe 24 Good Good Overall good condition, discharges directly into surface water body No -- -- -- -72.804936 41.97032 15 OF-13 (190) 3/27/2020 Concrete Pipe 24 Good Fair Down steep embankment, underneath road, moderately vegetated. Murky biological sheen present. No -- -- -- -72.784524 41.958427 16 OF-14 (195) 3/27/2020 Corrugated Metal Pipe 48 Good Fair 48” corrugated metal pipe, minor damage – still suitable for sampling, leaf litter in outfall No -- -- -- -72.780895 41.9573744 17 OF-15 (198) 3/27/2020 Concre te Pipe 24 Good Fair 24” concrete channel discharging directly into Salmon Brook, overall good condition, mild erosion observed. No -- -- -- -72.779869 41.955479 18 OF-44 3/27/2020 Corrugated Metal Pipe 24 Good Good 24” pipe diameter, overall good condition, discharging directly into surface water No -- -- -- -72.835542 41.9500315 19 OF-86 3/27/2020 Concrete Flared End -- Good Fair Discharges to retention pond, leaf litter in outfall No -- -- -- -72.834055 41.9418036 2018 2020 Town of Granby Dry Weather Inspections 2018 -2024
Page 223
Number Outfall ID Inspection Date Material Subtype Diameter (Inches) Condition Erosion Control Notes Illicit Discharge Illicit Discharge Flow Type Illicit Discharge Description Sample Collection Longitude Latitude Town of Granby Dry Weather Inspections 2018 -2024 21 OF-109 3/27/2020 Concrete Pipe 16 Good Good Discharges into rip-rap, overall good condition No -- -- -- -72.871956 41.9738534 22 OF-153 3/27/2020 Concrete Flared End 16 Good Good Discharges into rip-rap, overall good condition No -- -- -- -72.843478 41.954902 23 OF-155 3/27/2020 HDPE Pipe 16 Poor Poor Silt in outfall, adjacent to bridge. No -- -- -- -72.837496 41.9489254 24 OF-74 (781) 3/27/2020 Manhole -- -- Good N/A Storwmater manhole, no discharge, overall good condition No -- -- -- -72.819988 41.9839482 25 OF-73 (776) 3/27/2020 Concrete Flared End 15 Poor Poor Behind landscaped residential homes, significant erosion observed, outfall silted in No -- -- -- -72.821936 41.9900326 26 OF-102 (1099) 3/27/2020 HDPE Pipe 24 Good Good 24" diameter pipe, overall good condition No -- -- -- -72.806861 41.9839482 27 OF-105 3/27/2020 -- -- -- Poor Poor Outfall silted in, significant leaf litter in outfall, pipe potentially damaged. No -- -- -- -72.804338 41.9702263 28 OF-62 11/15/22 Concrete Other 24 Excellent Good Concrete culvert in riprap swale going through residential yards. Adjacent to farm. Recieves sheetflow, which in turn channelizes off of roadway. Gravel driveway adjacent to culvert. No No -- -- -72.81805 41.9678674 29 OF-106 11/15/22 Concrete End Wall 18 Good Poor Concrete discharge pipe leading to wooded swale, culverted by asphalt paved road. Adjacent to HDPE Flared End pipe buried in leaf litter. Minimal riprap, mostly covered in leaf litter. Maintenance- leaf litter removal. No -- -- -72.814277 41.9725434 30 OF-164 11/15/22 HDPE Flared End 12 Fair Fair HDPE Flared End within riprap swale. In residential wooded area, discharges to pond. No No -- -- -72.815631 41.9613 31 OF-165 11/15/22 HDPE Flared End 12 Fair Poor HDPE Flared End. Minimum riprap at head of outfall- discharges to pond. Significant erosion of riprap going towards pond in residential area. Erosion Control No -- -- -72.816198 41.961225 32 OF-105 11/15/22 Concrete Other 12 Poor Poor Discharges to gravel filled swale. No riprap and buried in leaf litter. Erosion Control and maintenance - leaf litter removal. No -- -- -72.804313 41.970324 33 OF-3 11/15/22 Concrete Flared End 12 Good Excellent Concrete Flared End , discharges immediately into man-made pond in residential area. Well mulched-may see erosion of mulch during a significant storm event. Erosion Control No -- -- -72.800991 41.9661245 34 OF-4 11/15/22 Concrete Flared End 18 Good Excellent Concrete pipe discharging water from man-made pond to wooded swale/stream. Riprap at exit point of pipe to approximately 15 feet away. Residential driveway culverts outfall. No No -- -- -72.80022 41.9661725 2022 2020
Page 224
Number Outfall ID Inspection Date Material Subtype Diameter (Inches) Condition Erosion Control Notes Illicit Discharge Illicit Discharge Flow Type Illicit Discharge Description Sample Collection Longitude Latitude Town of Granby Dry Weather Inspections 2018 -2024 36 OF-133 11/15/22 Concrete Flared End 18 Good Good Concrete pipe discharging to stream in woods behind residential neighborhood. Riprap from discharge point to approximately 20 feet downstream. Potential leaf litter and debris blockage downstream. Maintenance- leaf litter removal. No -- -- -72.823886 41.9447367 37 OF-13 11/15/22 Concrete End Wall 36 Good Excellent Discharge infiltrates into ground. Concrete retaining wall on right side of outfall. No riprap. No No -- -- -72.784358 41.9578259 38 OF-14 11/15/22 Corrugated Metal Other 36 Poor Poor Discharges to intermittent stream with heavy sediment. Large hole in piping end due to rust. Poor erosion control. Residential area. Erosion Control and maintenance - check integrity of piping No -- -- -72.779662 41.9559251 39 OF-15 11/15/22 Concrete End Wall 18 Good Good Culvert by road receiving channelized sheetflow in residential area. Riprap on both sides of pipe. No No -- -- -72.779548 41.9553519 40 OF-95 11/15/22 Concrete End Wall 24 Good Poor Discharge to intermittent stream. Located in residential area. No erosion control Erosion Control No -- -- -72.776936 41.9551268 41 OF-136 11/15/22 Concrete Flared End 18 Fair Fair Discharges to wooded area- significant gully from discharge. Riprap from outfall to 10ft out. Residential area. Erosion Control No -- -- -72.77736 41.963283 42 OF-47 11/15/22 Concrete Flared End 18 Good Fair Discharge into wooded area. Some riprap at head of culvert, none on sides. Significant sediment loading. Residential area. Erosion Control and maintenance - sediment loading from connected infrastructure. No -- -- -72.780723 41.9631451 43 OF-46 11/15/22 -- -- -- Poor Poor Outfall covered by organic debris. Discharges to wooded area with significant ponding. No erosion control. Erosion control and maintenance - organic debris removal. No -- -- -72.780766 41.9649047 44 OF-123 11/15/22 Corrugated Metal Flared End 30 Poor Good Riprap at head of outfall, discharges to a ravine in wooded residential area. Minor hole inside piping caused by rust. Maintenance- inspect full integrity of piping. No -- -- -72.785678 41.9644835 45 OF-90 11/15/22 HDPE Flared End 36 Good Good HDPE pipe discharges to detention pond in wooded area. Riprap around detention basin- overflow appears to exit into adjacent area. No No -- -- -72.77933 41.9763496 46 OF-9 11/15/22 Concrete Flared End 12 Fair Poor Filled with leaves and debris. Discharges into residential yard. Located at end of road. No erosion control. Erosion Control and Maintenance - removal of leaves and debris. No -- -- -72.78385 41.9730833 47 OF-182 11/15/22 Concrete Flared End 36 Good Excellent Concrete pipe with metal Flared End discharging to riprap swale and into river nearby. Located in wooded area to the rear of a residential property. No No -- -- -72.7849 41.9723333 48 OF-10 11/15/22 Concrete Other 144 Excellent Good Outfall flows through footbridge in residential area, leads to stream with moderate flow. No No -- -- -72.784515 41.9731495 49 OF-181 11/15/22 Concrete Flared End 12 Fair Poor Filled with leaves and debris. No erosion control. Discharges into woods in residential area. No No -- -- -72.783183 41.97195 2022
Page 225
Number Outfall ID Inspection Date Material Subtype Diameter (Inches) Condition Erosion Control Notes Illicit Discharge Illicit Discharge Flow Type Illicit Discharge Description Sample Collection Longitude Latitude Town of Granby Dry Weather Inspections 2018 -2024 51 OF-111 11/21/22 -- -- -- -- -- Outfall located in residential property Will need access granted. No -- -- -72.873967 41.9747667 52 OF-110 11/21/22 -- -- -- -- -- Outfall located in residential yard Will need access granted. No -- -- -72.87335 41.9741167 53 OF-112 11/21/22 -- -- -- -- -- Outfall located in residential yard Will need access granted. No -- -- -72.8756 41.97565 54 OF-27 11/21/22 Other Other 60 Excellent Excellent Drainage swale in wooded area parallel to road. Residential neighborhood. Excellent riprap on both sides of swale. Water is clear and iced over at time of inspection. No No -- -- -72.859233 41.9914167 55 OF-28 11/21/22 HDPE Flared End 12 Excellent Excellent HDPE outfall in wooded area of residential home; riprap on either side of drainage location and on top of outfall; drainage location shows signs of sediment loading. Maintenance- potential sediment loading from connecting infrastrurcture. Further investigation needed. No -- -- -72.854983 41.99 56 OF-29 11/21/22 -- -- -- -- -- Out all located in residential yard Will need access granted. No -- -- -72.853867 41.9895167 57 OF-30 11/21/22 -- -- -- Poor Good Outfall covered in leaves and debris; '-- outfall type; appears to flow into area with adequate riprap on either side and above; located between two residential homes in wooded area. Maintenance- leaf and debris removal. No -- -- -72.85265 41.9888 58 OF-38 11/21/22 HDPE Flared End 12 Good Fair HDPE outfall in wooded area at end of road; no riprap; discharge flows over moss and wooded features; boulders at base of discharge area; discharge area indicates sediment loading. Maintenance- potential sediment loading from connecting infrastrurcture. Further investigation needed. No -- -- -72.857717 41.9871667 59 OF-37 11/21/22 HDPE Flared End 12 Excellent Excellent HDPE outfall in wooded area between two residential homes; stones at base of outfall and surrounded drainage area No No -- -- -72.860433 41.9893667 60 OF-2 11/21/22 -- -- -- -- -- Outfall located in residential yard. Will need access granted. No -- -- -72.860133 42.0091667 61 OF-99 11/21/22 HDPE Flared End 12 Poor Poor Outfall located parallel to road and discharges into drainage swale; outfall and swale indicate sediment loading; residential area with apple orchard adjacent property Maintenance- potential sediment loading from connecting infr astr urcture. Further investigation needed. No -- -- -72.863217 42.0083667 62 OF-69 11/21/22 Corrugated Metal Other 12 Fair Good Outfall located in wooded area of residential neighborhood; riprap visible on either side of outfall, top of outfall, and at base of drainage channel; outfall filled with sandy material Maintenance- sediment removal No -- -- -72.852667 42.0150167 63 OF-68 11/21/22 Concrete Flared End 18 Poor Fair Outfall located in wooded area of residential neighborhood; riprap visible at mouth of outfall pipe and in discharge area; heavy leaf litter filling outfall . Maintenance- leaf litter removal. No -- -- -72.853285 42.0158677 2022
Page 226
Number Outfall ID Inspection Date Material Subtype Diameter (Inches) Condition Erosion Control Notes Illicit Discharge Illicit Discharge Flow Type Illicit Discharge Description Sample Collection Longitude Latitude Town of Granby Dry Weather Inspections 2018 -2024 64 OF-67 11/21/22 Concrete Flared End 18 Fair Fair Outfall on Other side of road and connected to outfall 68; discharges into wooded swale: riprap on either side of swale and above outfall; heavy leaf litter Maintenance- leaf litter removal. No -- -- -72.853467 42.01585 65 OF-100 11/21/22 Concrete Other 18 Poor Poor Outfall pipe discharging to an intermittent stream in wooded area adjacent to road; residential area; brick sized riprap on either side of stream; wood debris covering outfall Maintenance- debris removal No -- -- -72.84835 42.0157833 66 OF-119 11/21/22 Concrete Flared End 12 Fair Fair Outfall pipe discharges to small drainage swale with riprap on all sides; located in wooded area of residential neighborhood; heavy leaf litter in outfall pipe Maintenance- leaf litter removal. No -- -- -72.859 42.0314833 67 OF-120 11/21/22 -- -- -- -- -- Outfall located in residential yard Will need access granted. No -- -- -72.857017 42.0305 68 OF-121 11/21/22 -- -- -- -- -- Outfall located in residential yard Will need access granted. No -- -- -72.85495 42.0299167 69 OF-129 11/21/22 -- -- -- -- -- Outfall located in residential yard Will need access granted. No -- -- -72.8541 42.028 70 OF-122 11/21/22 Concrete Flared End 12 Poor Poor Outfall located in residential area and discharges to a wooded swale; no visible riprap; outfall pipe and swale covered with leaf and wood litter Erosion Control and maintenance - leaf litter and wood removal No -- -- -72.853183 42.0293 71 OF-132 11/21/22 Concrete Flared End 18 Excellent Good Outfall pipe located in wooded area of residential neighborhood; discharges to drainage swale leading into woods; brick sized riprap located on all sides and bottom of swale. No No -- -- -72.847967 42.0267667 72 OF-131 11/21/22 -- -- -- -- -- Outfall located in residential yard Will need access granted. No -- -- -72.846783 42.0287333 73 OF-41 11/21/22 Concrete Flared End 12 Good Fair Outfall pipe adjacent to road and discharged into small swale; located in residential area; no riprap, medium sized b oulders naturally around base of swale; signfiicant leaf litter Maintenance- leaf litter removal. No -- -- -72.845433 42.03185 74 OF-151 11/21/22 Concrete headwall 36 Good Good Intermittent stream and small pond adjacent to road and at b ase of ravine; medium stones and small boulders along edges of stream; headwall at entrance of culverted stream No No -72.843467 42.0358667 75 OF-53 11/21/22 -- -- -- -- -- Outfall located in residential yard Will need access granted. No -- -- -72.849427 42.0348069 76 OF-147 11/21/22 -- -- -- -- -- Outfall located in residential yard Will need access granted. No -- -- -72.840183 42.0279667 77 OF-145 11/21/22 Corrugated Metal Flared End 60 Good Good Outfall pipe in residential area adjacent to road; discharges into perennial pond; medium sized boulders at mouth of outfall and entrance to pond. No No -- -- -72.843767 42.0279333 2022
Page 227
Number Outfall ID Inspection Date Material Subtype Diameter (Inches) Condition Erosion Control Notes Illicit Discharge Illicit Discharge Flow Type Illicit Discharge Description Sample Collection Longitude Latitude Town of Granby Dry Weather Inspections 2018 -2024 78 OF-159 11/21/22 -- -- -- -- -- Outfall in residential yard Will need access granted. No -- -- -72.841083 42.0237167 79 OF-158 11/21/22 Concrete Flared End 36 Excellent Fair Outfall located in woods of residential neighborhood; discharges to flat wooded area with organic material No No -- -- -72.839533 42.0226833 80 OF-157 11/21/22 Concrete Flar ed End 60 Excellent Excellent Outfall located in wooded area of residential neighborhood; outfall pipe discharges to swale with brick sized riprap on all sides. No No -- -- -72.83905 42.0215 81 OF-156 11/21/22 Concrete Flared End 18 Good Good Outfall in wooded area of residential neighborhood; p arallel to OF-157; discharges to swale with riprap on all sides; brick sized riprap on top of outfall pipe. No No -- -- -72.839633 42.0208667 82 OF-144 11/21/22 -- -- -- Poor Poor Outfall located in overgrown wooded swale at corner of Stonehenge Way and Silver Street; outfall pipe covered in brush and leaf litter and not visible; no visible erosion control. Erosion Control and Maintenance - removal of leaves and brush. No -- -- -72.840733 42.0199667 83 OF-176 11/21/22 -- -- -- -- -- Outfall located in wooded area behind home. Will need access granted. No -- -- -72.847533 42.02225 84 OF-98 11/21/22 HDPE Other 12 Good Good Outfall pipe in wooded area adjacent to road in residential neighborhood; discharges to swale with brick sized riprap along swale and on top of pipe; ephemeral stream beyond rip rap. No No -- -- -72.8437 42.0043667 85 OF-141 11/21/22 Concrete Other 12 Fair Fair Outfall pipe from under road to empty field; surrounded by brush; discharges to small gravel swale. Erosion control and maintenance - brush clearing No -- -- -72.863883 41.9718167 86 OF-72 11/21/22 -- -- -- -- -- Outfall located in residential yard Will need access granted. No -- -- -72.780011 41.9591265 87 OF-65 07/20/23 Concrete End Wall 3 Good -- No riprap erosion control, no organic debris covering the mouth of the outfall. 3 inch HDPE pipe likely from 12 Byron Drive discharging significant amount of water into catch basin linked to OF 65. Sample taken from discharge pipe. Yes Heavy Foamy, organic smell Sample collected from discharge pipe -72.799925 41.9287993 88 OF-113 07/20/23 Concrete End Wall 12 Excellent Poor di scharges into wooded swale No -- -- -- -72.843083 41.9602333 89 OF-114 07/20/23 Concrete End Wall 12 Excellent Poor di scharges into wooded swale No -- -- -- -72.842833 41.9621833 90 OF-115 07/20/23 Concrete End Wall 12 Fair N/A End Wall with no riprap and no organic debris blocking it No -- -- -- -72.842067 41.9631 91 OF-169 04/10/23 HDPE Other 12 Good Good Observed clean and free of debris, riprap observed nearby, upgradient catch basin observed with some organic debris on grate No -- -- -- -72.799518 41.9630849 92 OF-188 07/20/23 Concrete End Wall 12 Fair Poor No riprap erosion control, outfall located deep in the woods along a walking path No -- -- -- -72.789517 41.99995 93 OF-189 07/20/23 Concrete Flared End 12 Poor N/A OF-189, outfall was almost completely submerged in the pond , no riprap No -- -- -- -72.802067 41.9264667 94 OF-19 07/20/23 Concrete End Wall 12 Good Poor disc harges into wooded swale No -- -- -- -72.885667 41.9490333 2022 2023
Page 228
Number Outfall ID Inspection Date Material Subtype Diameter (Inches) Condition Erosion Control Notes Illicit Discharge Illicit Discharge Flow Type Illicit Discharge Description Sample Collection Longitude Latitude Town of Granby Dry Weather Inspections 2018 -2024 96 OF-22 07/20/23 Concrete End Wall 12 Excellent Poor discharges into grassy swale that leads to pond No -- -- -- -72.88855 41.9412833 97 OF-32 07/20/23 HDPE Flared End 12 Excellent Excellent discharges into wooded swale No -- -- -- -72.864833 41.95065 98 OF-57 07/20/23 Concrete Flared End 12 Fair Fair No organic debris covering outfall, riprap could be better No -- -- -- -72.893817 41.9396833 99 OF-60 07/20/23 Concrete End Wall 12 Excellent Good discharges into stream No -- -- -- -72.883604 41.9535825 100 OF-84 04/10/23 Concrete Flared End 14 Poor Fair Lots of leaf litter, fallen b ranches and organic debris at mouth of outfall, little sediment accumulation observed in pipe, erosion control (asphalt Flared End) deterioration, No -- -- -- -72.799533 41.9649667 101 OF-89 04/10/23 Concrete Flared End 16 Fair Good Little sediment, leaf litter and algae observed in pipe, little deterioration to Flared End, riprap under wire outlining dry basin, adjacent to metal culvert -- -- -- -- -72.830991 41.9405359 102 OF-42 07/20/23 Corrugated Metal End Wall 18 Good Poor discharges into wooded swale No -- -- -- -72.826474 41.9634246 103 OF-6 04/10/23 Corrugated Metal Other 18 Good Poor Rill erosion observed at mouth of outfall, little refuse observed, connected to catch b asin - well maintained trail to outfall location, leaf litter and organic debris restricting flow to stream No -- -- -- -72.804783 41.9192667 104 OF-70 04/10/23 Corrugated Metal Flared End 18 Good Poor Little sediment inside pipe, some sediment and organic debris accumulation at mouth restricting flow path -- -- -- -- -72.798432 41.9196044 105 OF-88 04/10/23 Concrete Flared End 20 Good Fair Lots of rip rap under metal wire observed around nearby basin (dry), lots of algae in water inside outfall, organic debris and overgrowth restricting flow -- -- -- -- -72.832164 41.9416166 106 OF-101 07/20/23 Concrete Flared End 24 Good Fair disc harges into wooded swale No -- -- -- -72.794711 41.9978051 107 OF-140 07/20/23 Concrete Flared End 24 Excellent Good discharges into wooded swale No -- -- -- -72.801445 41.9270434 108 OF-167 07/20/23 Corrugated Metal Flared End 24 Fair Poor Organic debris covering the area, riprap in poor condition No -- -- -- -72.83905 41.96065 109 OF-17 07/20/23 HDPE Flared End 24 Good Fair discharges into wooded swale. Likely a stream No -- -- -- -72.782256 41.9929713 110 OF-173 04/10/23 Concrete Flared End 24 Fair Poor Disconnected from Flared End, rill erosion observed, algae on water, some sediment and organic debris accumulation restricting flow path, connected to upgradient catch basin No -- -- -- -72.805754 41.919734 111 OF-174 07/20/23 Concrete End Wall 24 E xcellent Excellent discharges into wooded stream No -- -- -- -72.853083 41.9617333 112 OF-175 07/20/23 Concrete Flared End 24 Fair Fair Water is slowly flowing from the pond into the outfall No -- -- -- -72.850617 41.9621667 113 OF-184 07/20/23 HDPE Flared End 24 -- N/A No riprap erosion control, a small amount of organic debris at the bottom of the outfall No -- -- -- -72.786576 41.9951394 114 OF-31 07/20/23 HDPE Flared End 24 Fair Good Outfall located a little ways into the woods, plenty of riprap, no organic debris covering it No -- -- -- -72.863533 41.9541833 115 OF-43 07/20/23 Corrugated Metal Flared End 24 Poor Poor Organic debris covering most of the mouth of the outfall but not blocking it, little-to-no riprap No -- -- -- -72.834683 41.9564833 2023
Page 229
Number Outfall ID Inspection Date Material Subtype Diameter (Inches) Condition Erosion Control Notes Illicit Discharge Illicit Discharge Flow Type Illicit Discharge Description Sample Collection Longitude Latitude Town of Granby Dry Weather Inspections 2018 -2024 117 OF-63 07/20/23 Concrete Flared End 24 Good Fair discharges into pond in wooded area No -- -- -- -72.88795 41.9247333 118 OF-75 07/20/23 Concrete End Wall 24 Good Good discharges into stream. Outfall has good erosion control, but stream is causing considerable erosion. No -- -- -- -72.811846 41.9963389 119 OF-94 07/20/23 Concrete Flared End 24 Fair N/A N o organic debris covering the outfall, no riprap erosion control No -- -- -- -72.817967 41.9800833 120 OF-16 07/20/23 HDPE Flared End 30 Fair Fair No organic debris covering outfall, no riprap erosion control No -- -- -- -72.7844 41.9912167 121 OF-21 07/20/23 Concrete Flared End 32 Fair N/A No riprap erosion control, outfall located about 5-8 feet from pond No -- -- -- -72.888233 41.9416667 122 OF-116 07/20/23 Concrete End Wall 36 Good Good di scharges into stream No -- -- -- -72.804051 41.9564097 123 OF-180 07/20/23 Corrugated Metal End Wall 36 Good Good discharges into wooded area. stream connected across the street No -- -- -- -72.807267 41.9954352 124 OF-55 07/20/23 Concrete Flared End 40 Fair N/A No riprap erosion control, no organic debris covering outfall, the neighbor told me the area tends to flood whenever it rains No -- -- -- -72.811883 41.9976667 125 OF-137 07/20/23 -- -- -- -- -- located behind private property. could not locate -- -- -- -- -72.77886 41.9649746 126 OF-177 07/20/23 -- -- -- -- -- private property could not locate -- -- -- -- -72.777633 41.9461 127 OF-18 07/20/23 -- -- -- -- -- Outfall located on 50 mph road, deemed not safe to investigate -- -- -- -- -72.884233 41.9531833 128 OF-183 07/20/23 -- -- -- -- -- on private property. could not locate -- -- -- -- -72.804852 41.9252782 129 OF-187 07/20/23 -- -- -- -- -- Outfall was behind a fenced in area, could not go to investigate -- -- -- -- -72.795517 41.9289833 130 OF-23 07/20/23 -- -- -- -- -- heavily vegetated area. could not locate. no catch basin to reference. -- -- -- -- -72.890983 41.9364833 131 OF-24 07/20/23 -- -- -- -- -- private property could not locate -- -- -- -- -72.889899 41.9313678 132 OF-25 07/20/23 -- -- -- -- -- behind fence. could not locate -- -- -- -- -72.88795 41.9280667 133 OF-51 07/20/23 -- -- -- -- -- could not locate -- -- -- -- -72.823095 41.9977778 134 OF-52 07/20/23 -- -- -- -- -- Could not locate outfall -- -- -- -- -72.82165 41.99785 135 OF-54 07/20/23 -- -- -- -- -- Could not locate outfall but found some riprap going into the stream -- -- -- -- -72.811705 41.9965691 136 OF-59 07/20/23 -- -- -- -- -- private property could not locate -- -- -- -- -72.886667 41.94215 137 OF-61 04/10/23 -- -- -- -- Poor OF-61 could not locate, possibly covered by leaf litter and organic debris, significant rill erosion along abutting property’s driveway and back yard, ponding observed in backyard, upgradient catch basin with lots of sediment -- -- -- -- -72.798129 41.9624553 138 OF-7 07/20/23 -- -- -- -- -- located down a very steep embankment. could not Iocate. discharges into wooded area likely containing a stream -- -- -- -- -72.8631 41.9553167 139 OF-80 04/10/23 Precast Flared End -- Poor Poor Completely buried, lots of sediment accumulation and organic debris at mouth of outfall, connected to 2 upgradient catch basins No -- -- -- -72.788783 41.9206805 140 OF-81 04/10/23 Concrete Flared End -- Poor Poor Completely buried/silted in, leaf litter and sediment accumulation at mouth of outfall No -- -- -- -72.801673 41.9643991 2023
Page 230
Number Outfall ID Inspection Date Material Subtype Diameter (Inches) Condition Erosion Control Notes Illicit Discharge Illicit Discharge Flow Type Illicit Discharge Description Sample Collection Longitude Latitude Town of Granby Dry Weather Inspections 2018 -2024 142 OF-85 04/10/23 Concrete Flared End -- Poor Poor Completely buried/silted in, lots of leaf litter , sediment and organic debris, evidence of rill erosion covered by debris -- -- -- -- -72.799646 41.9633826 143 OF-86 04/10/23 Concrete Flared End -- Poor Poor Completely buried, lots of sediment inside pipe, lots of leaf litter and organic debris blocking flow path, pooling observed with lots of algae, nearby culvert with medium to large riprap nearby -- -- -- -- -72.83428 41.9418333 144 OF-87 04/10/23 -- -- -- Poor Poor Completely covered/obstructed by vines and fallen trees, nearby culvert culvert, little medium riprap around mouth of outfall, riprap under metal wire around dry basin, lots of leaf litter and organic debris obstructing flow -- -- -- -- -72.832964 41.9419666 145 OF-91 07/20/23 -- -- -- -- -- Could not locate -- -- -- -- -72.809459 41.9572965 146 OF-190 (Unmapped) 04/10/23 Concrete End Wall -- Poor Poor Unmapped location, end wall and buried pipe observed on private property connected to catch basin at street, actual outfall mapped on property was not found -- -- -- -- -72.801612 41.9639316 147 OF-191 (Unmapped) 04/10/23 Concrete Flared End -- Poor Poor Unmapped outfall observed completely buried in sediment. Outfall potentially connected to catch basin at street and flow into stream behind private property -- -- -- -- -72.800965 41.9646858 148 OF-5 12/13/24 -- -- -- -- -- Outfall located on private property -- -- -- -- -72.830732 41.9295177 149 OF-161 12/13/24 HDPE Flared End -- Excellent Good Outfall in good condition, Flared End clear of sediment and debris. No -- -- No -72.832167 41.9334 150 OF-162 12/13/24 -- -- -- -- -- Outfall located on private property -- -- -- -- -72.837367 41.9333 151 OF-45 12/13/24 -- -- -- -- -- Followed a path in the woods that seemed to be leading to outfall, there was a gate almost halfway to the outfall, did not proceed past the gate. -- -- -- No -72.835767 41.9351667 152 OF-108 12/13/24 HDPE Flared End -- Good Good A pond that discharges to a stream, the pond was frozen so it was not discharging. No -- -- No -72.839367 41.9374667 153 OF-89 12/13/24 Concrete Flared End -- Good Good No sediment or debris blocking outfall, good erosion control under leaves No -- -- No -72.830997 41.9405333 154 OF-77 12/13/24 Concrete Flared End -- Good Good Very large Flared End, outfall appears to be on the opposite side of the road where it’s marked on the map. No -- -- No -72.824233 41.9246167 155 OF-76 12/13/24 Concrete Flared End -- Good Good Outfall located about 20 feet into the woods, no sediment or debris blocking outfall, very large Flared End. No -- -- No -72.824333 41.9243667 156 OF-139 12/13/24 -- -- -- -- -- Located on private property -- -- -- No -72.8029 41.9276167 157 OF-189 12/13/24 Concrete Flared End -- -- None Outfall feeds into the large pond, a crack in the pipe was observed. No -- -- -- -72.802067 41.9264667 158 OF-64 12/13/24 -- -- -- -- -- Unable to locate outfall, appears to be behind someone’s house and deep in the woods. -- -- -- No -72.899183 41.9262333 2024 2023
Page 231
Number Outfall ID Inspection Date Material Subtype Diameter (Inches) Condition Erosion Control Notes Illicit Discharge Illicit Discharge Flow Type Illicit Discharge Description Sample Collection Longitude Latitude Town of Granby Dry Weather Inspections 2018 -2024 160 OF-97 12/13/24 Concrete End Wall -- Good Good Very slight discharge, seemed to be groundwater. Yes Trickle -- No -72.8778 41.95735 161 OF-26 12/13/24 Concrete End Wall -- Good Good Outfall marked in the middle of intersection, there is also a swale that runs along the street. No -- -- No -72.822817 41.9706833 162 OF-93 12/13/24 -- -- -- -- -- Outfall located on private property, running water was heard inside the catch basin. Too deep to grab a sample. -- -- -- -- -72.819465 41.9724323 163 OF-92 12/13/24 -- -- -- -- -- Outfall located on private property -- -- -- No -72.818817 41.9722167 164 OF-12 12/13/24 -- -- -- -- -- Outfall located behind private property. -- -- -- No -72.817417 41.9725833 165 OF-107 12/13/24 -- -- -- -- -- Outfall located on private property. -- -- -- No -72.812167 41.9711 166 OF-118 12/13/24 Concrete Flared End -- Poor Poor Sediment and organic debris build up in outfall. No -- -- No -72.81505 41.9694667 167 OF-78 12/13/24 Concrete Flared End -- In Need of Repair None Outfall 75% buried in sediment and organic debris, also the map says that it’s on the left side of the street but it’s actually straight ahead. No -- -- No -72.813583 41.9685 168 OF-166 12/13/24 Concrete -- -- Good -- Only able to view outfall from street, located on private property. Yes -- -- No -72.818783 41.9618667 169 OF-66 12/13/24 Concrete Flared End -- Good Good Appeared to be a culvert for a stream. Yes -- -- No -72.805867 41.9556667 170 OF-186 12/13/24 -- -- -- -- -- Outfall located on private property, catch basin grate appeared to be deteriorating -- -- -- -- -72.797673 41.9525267 171 OF-61 12/13/24 -- -- -- -- -- Outfall located on private property. -- -- -- -- -72.798129 41.9624543 172 OF-39 12/18/24 Concrete Flared End -- Good None 24"" concrete Flared End discharges to wooded swlae that leads to a surface waterbody. Leaf litter and detritus present within the pipe. No erosion controls observed. No -- -- No -72.79415 41.9715667 173 OF-40 12/18/24 Concrete Flared End -- Good Poor Outfall in good condition but erosion observed on sides of swale. rip rap present underneath outfall mouth No -- -- -- -72.794533 41.9728167 174 OF-36 12/18/24 -- -- -- -- -- Could not confirm location of outfall, located on residential property. No pipes visible in associated catch basin. There appears to be a drainage area across the street, but no visible pipe. No -- -- No -72.776117 41.9751833 175 OF-128 12/18/24 -- -- -- -- -- No outfall or catch basins observed in immediate area of mapped outfall. Road was recently repaved and brand new catch basins were observed. -- -- -- No -72.766367 41.9742167 176 OF-127 12/18/24 Concrete -- -- -- -- Unable to find exact location of outfall. likely behind residential property. connecting catch basin has a small hope pipe discharging into it. farm land observed in general area outfall. -- -- -- No -72.76845 41.9718833 177 OF-126 12/18/24 Corrugated Metal End Wall -- Good Poor Two 18" corrugated metal pipes discharge to a wooded swale. One pipe is connected to a catch basin up the street, the Other acts as overflow for the pond across the street. Pipes are partially blocked by leaf litter and sediment. No -- -- No -72.774108 41.9649043 178 OF-163 12/18/24 Concrete -- -- Good -- Unable to locate outfall located on residential property discharges to a small pond period catch basin.Not flowing. -- -- -- No -72.813817 41.9603667 2024
Page 232
Number Outfall ID Inspection Date Material Subtype Diameter (Inches) Condition Erosion Control Notes Illicit Discharge Illicit Discharge Flow Type Illicit Discharge Description Sample Collection Longitude Latitude Town of Granby Dry Weather Inspections 2018 -2024 180 OF-185 12/18/24 HDPE End Wall -- Good None 18"" hdpe pipe discharges to grassy swale. No erosion controls present and rill erosion along swale observed. Some minor leaf litter accumulated in the pipe. No -- -- No -72.814783 41.9796 181 OF-178 12/18/24 Corrugated Metal -- -- Good Poor 18"" corrugated metal pipe discharges to wooded stream. No -- -- No -72.811817 41.9865333 182 OF-135 12/18/24 Concrete -- -- -- -- 18"" pipe in catch basin discharges to outfall located on residential property. No -- -- No -72.812733 41.9861167 183 OF-171 12/18/24 Concrete -- -- -- -- 18"" concrete pipe discharges from catch basin to an outfall on residential property. It is assumed the outfall discharges to the pond/wetland area behind the home. No -- -- No -72.803067 41.9839833 184 OF-172 12/18/24 Concrete Pipe -- Good Good Outfall observed to be in good condition. Rip rap at mouth of pipe minimizing erosion. Discharges to a wetland area that is wooded. No -- -- No -72.802717 41.9831333 185 OF-179 12/18/24 -- -- -- -- -- Unable to locate outfall in residential back yard. New catch basin grated and road was recently paved. Connecting catch basin was recently cleaned. -- -- -- No -72.808983 41.9921333 186 OF-134 12/18/24 Corrugated Metal End Wall -- Good None 18"" corrugated metal pipe discharges to wooded swale. No erosion controls observed. Rill erosion observed. No -- -- No -72.80545 41.9916667 187 OF-138 12/18/24 -- -- -- -- -- Unable to locate outfall, observed to be in residential back yard. catch basin has some sediment in basin. -- -- -- No -72.80135 41.9927 188 OF-50 12/18/24 Concrete -- -- -- -- 18"" concrete pipe discharges from catch basin to woods behind home. No -- -- No -72.8044 41.9946333 189 OF-48 12/18/24 Concrete Flared End -- Good Good Culvert outfall directing water under the road. steady flow fromm stream in a wooded area. good rip rap present Yes Steady -- No -72.80575 41.9953667 190 OF-8 12/18/24 HDPE -- -- Good Good 18"" hdpe Flared End discharges to stream in wooded area. some small to medium riprap observed. -- -- -- No -72.805717 41.9956 191 OF-54 12/18/24 Concrete Flared End -- Poor Good outfall pipe found semi buried near a goat farm. discharges to Bradley brook via rip rap No -- -- No -72.8117 41.9965667 192 OF-33 12/18/24 HDPE End Wall -- Good Poor 18"" hdpe pipe discharges to roadside wooded swale. some large pieces of riprap observed. Some rill erosion observed. No -- -- No -72.816867 42.00245 193 OF-34 12/18/24 -- -- -- -- -- Closest cb does not have piping going to small stream. -- -- -- -- -72.8189 42.0045333 194 OF-35 12/18/24 Concrete Pipe -- Good Good outfall observed to be in good condition with rip rap for erosion control. discharges tona stream that travels through neighborhood back yards. No -- -- No -72.8223 42.0059167 195 OF-117 12/18/24 Corrugated Metal -- -- -- -- 18"" corrugated metal pipe discharges from catch basin to wooded area behind home. No -- -- No -72.82045 42.0217167 196 OF-143 12/18/24 Concrete Pipe -- Poor None Outfall discharges to a stream behind residential properties. outfall blocked by tree with no erosion control present. connecting catch basin also receives runoff from opposite side of road where a sheep farm is located. a pond/swale was observed on farm side No -- -- No -72.840398 42.0134286 2024
Page 233
Number Outfall ID Inspection Date Material Subtype Diameter (Inches) Condition Erosion Control Notes Illicit Discharge Illicit Discharge Flow Type Illicit Discharge Description Sample Collection Longitude Latitude Town of Granby Dry Weather Inspections 2018 -2024 198 OF-146 12/18/24 -- -- -- -- -- Unable to locate outfall. Could not locate associated catch basin. -- -- -- No -72.8433 42.0262667 199 OF-149 12/18/24 Concrete End Wall -- Good Good 18"" concrete pipe discharges to a wooded stream. No -- -- No -72.8343 42.02895 200 OF-150 12/18/24 Concrete Pipe -- Good Good Small pipe next to culvert. two small outfalls next to large culverted pipe discharges into stream. both are connected to catch basin No -- -- No -72.834163 42.0290724 201 OF-96 12/18/24 Concrete -- -- Good -- Unable to locate outfall. on residential property by a lake. Inspected connecting catch basin, in good condition No -- -- No -72.850383 42.0317333 202 OF-130 12/18/24 Concrete -- -- Poor Poor Outfall pipe appears to be buried in leaf litter. Pipe observation in catch basin shows an 18"" concrete pipe. No -- -- No -72.8503 42.0228167 203 OF-124 12/18/24 HDPE Pipe -- Good Good Discharges to fox brook. some sediment accumulation observed downstream of brook. rip rap in place to minimize erosion. pipe was dry during inspection. connecting cb was covered in leaf litter No -- -- No -72.862033 42.0267833 204 OF-125 12/18/24 Concrete -- -- In Need of Repair None Outfall discharges to wooded area. Sediment accumulation observed in drainage area. Pipe appears to be completely buried. No -- -- No -72.863667 42.0281833 1. Outfalls were sampled for potential Illicit Discharges 2. Outfalls inspected multiple times throughout permit (15) 2024 Notes
Page 234
DRY WEATHER INSPECTIONS ILLICIT DISCHARGE SAMPLING RESULTS
Page 235
Chlorine Residual Ammonia as Nitrogen MBAS Conductivitiy Salinity Escherichia Coli Total Coliforms umhos/cm ppt OF-104 11/15/22 Good Discharge Observed. <0.02 0.17 0.13 373 <0.50 243 >24200 OF-65 7/20/23 Good Discharge is foamy and has an organic odor. 3 inch plastic pipe likely from 12 Byron Drive discharging heavy flow of water into catch basin linked to OF 65. Sample taken from discharge pipe in CB-180. <0.02 <0.05 <0.10 80 <0.5 41 2,360 3. Fecal Coliform >31 col/100 mL for Cl ass SA and >260 col/100mL for Class SB 4. Enterococci >104 col/100mL for Swimming Areas and >500 col/100mL for all others. 5. Ammonia >0.5 mg/L 6. Surfactants (MBAS) > 0.25 mg/L Atlas did not observe any Illicit Discharges while dry weather inspecting outfalls in 2024. 2022 2023 Discharge Description Screening Indicators 2024 mg/L MPN/100mL 8. Conductivity >1,500 uS 9. Salinity ≥ 0.5 ppt Town of Granby Dry Weather Inspections Illicit Discharge Sampling Results Notes: * All highlighted bacterial concentrations are required for follow-up investigations. *Highlighting is based on the following criteria; 1. E. Coli >235/100mL for Swimming Ar eas, and >410 col/100mL for all others. 2. Total Coliform > 500 col/100mL 7. Chlorine: detectable level Outfall ID Inspection Date Condition
Page 236
CATCHMENT ASSESSMENT AND PRIOIRTY RANKING MATRIX
Page 237
Town of Granb
y
Catchment Assessment
and
Priority Ranking Matrix
Catc
hment ID Receiving Water
Previous Screening
Results Indicate
Likely Sewer Input?
1
Discharging to
Area of Concern
to Public Health?
2
Frequ
ency of
Past Discharge
Complaints
Receiving
Water
Quality
3
Density of
G
enerating Sites
4
Age of Develo
pment/
Infrastructure
5
Historic
Combin
ed
Sewers or
Septic?
6
Aging
Sep
tic?
7
Culverted
Streams?
8
Additional Chara
cteristics
Sewer Repair
Nearby?
Urbanized Area DCIA >11% Impaired Waterbody
Additional
Characteristics
Score
Catchment
inspections and
sample results
GIS Maps Municipal Staff
Impaired
Waters List
Land Use/GIS
Maps, Aerial
Photography
Land Use Information,
Visual Observation
Municipal Staff,
GIS Maps
Land Use,
Municipal
Staff
GIS and Storm
System Maps
Other
Municipal Staff, GIS
Maps
CLEAR
Nathan L. Jacobson &
Associates
CLEAR
Other
Yes = 3 (Pr
oblem
Catchm
ent)
Yes = 3 Freque
nt = 3 Poor = 3 High = 3
High = 3
Yes = 3 Yes = 3 Yes = 3
Yes=2
Yes =1
Yes =1
Yes =1
High = 3
No = 0
No = 0 Occasional = 2 Fair = 2 Medium = 2 Medium = 2 No = 0 No = 0 No = 0
No=0
No = 0
No = 0
No = 0 Medium =1-2
None = 0 Good = 0 Low = 1
Low = 1
Low = 0
4001-00-1* Great Brook
0
0
1
2
0
0 Wooded; goes into MA
0
0
0
1
4 Low Priority
4300-44-1-L1 Farmington River
0
0
3
1
0
0
Mostly residential with some
agricultrual
2
1
0
0
1
8 Problem
4309-00-1 Cherry Brook
0
0
1
1
0
0
Wooded with some
agricultural land
0
0
0
1
3 Low Priority
4309-01-1 Cherry Brook
0
0
2
2
0
3
Wooded with residential
along highway
1
0
0
2
10 High Priority
4309-02-1 Cherry Brook
0
0
1
1
0
0
Mostly wooded with some
residential
1
0
0
0
3 Low Priority
4319-00-2-R1 West Branch Salmon Brook
3
2
2
2
0
3
Mostly wooded with
recreational areas along
stream and some residential
1
0
1
2
16 High Priority
4319-00-2-R2 West Branch Salmon Brook
0
2
2
2
0
3
Woode
d W of stream;
Residen
tial E of stream
2
1
0
1
1
14 High Prior
ity
4319-00-3-R1 West Branch Salmon Brook
0
2
1
2
0
0
Woode
d with State Hwy 20
bisecting catchm
ent
0
0
1
1
7 Problem
43
19-00-3-R2 West Branch Salmon Brook
0
2
1
2
0
0
Mostly wooded with light
agricultural land East of the
stream
1
0
1
1
8 Problem
4319-00-3-R3 West Branch Salmon Brook
0
2
1
1
0
0
Wooded
0
0
1
0
5 Low Priority
4319-00-3-R4 West Branch Salmon Brook
0
2
2
2
0
0 Agricultural and Wooded
0
0
1
1
8 Problem
4319-00-3-R5 West Branch Salmon Brook
3
2
1
2
0
3
Wooded with some
residential/commercial; park
2
1
0
1
1
16 High Priority
4319-00-3-R6 West Branch Salmon Brook
0
2
2
2
0
3
Wooded/residential with
some agricultural land
1
0
1
1
12 High Priority
4319-02-1 Moosehorn Brook
0
0
1
1
0
3
Mostly wooded with minimal
residential
0
0
0
1
6 Problem
4319-03-2-R1 West Branch Salmon Brook
0
0
1
1
0
0
Woode
d; Stream meanders
Westward; flo
odplain
0
0
0
0
2 Low Priority
Sco
re
Priority Ranking
Low Priority:
0-5
Problem
: 6-9
High Prior
ity
: ≥10
Information Source
Scoring Criteria
Description
Page 1 of 6Page 238
Town of Granb
y
Catchment Assessment
and
Priority Ranking Matrix
Catc
hment ID Receiving Water
Previous Screening
Results Indicate
Likely Sewer Input?
1
Discharging to
Area of Concern
to Public Health?
2
Frequ
ency of
Past Discharge
Complaints
Receiving
Water
Quality
3
Density of
G
enerating Sites
4
Age of Develo
pment/
Infrastructure
5
Historic
Combin
ed
Sewers or
Septic?
6
Aging
Sep
tic?
7
Culverted
Streams?
8
Additional Chara
cteristics
Sewer Repair
Nearby?
Urbanized Area DCIA >11% Impaired Waterbody
Additional
Characteristics
Score
Catchment
inspections and
sample results
GIS Maps Municipal Staff
Impaired
Waters List
Land Use/GIS
Maps, Aerial
Photography
Land Use Information,
Visual Observation
Municipal Staff,
GIS Maps
Land Use,
Municipal
Staff
GIS and Storm
System Maps
Other
Municipal Staff, GIS
Maps
CLEAR
Nathan L. Jacobson &
Associates
CLEAR
Other
Yes = 3 (Pr
oblem
Catchm
ent)
Yes = 3 Freque
nt = 3 Poor = 3 High = 3
High = 3
Yes = 3 Yes = 3 Yes = 3
Yes=2
Yes =1
Yes =1
Yes =1
High = 3
No = 0
No = 0 Occasional = 2 Fair = 2 Medium = 2 Medium = 2 No = 0 No = 0 No = 0
No=0
No = 0
No = 0
No = 0 Medium =1-2
None = 0 Good = 0 Low = 1
Low = 1
Low = 0
Score
Priority Ranking
Low Priority:
0-5
Problem
: 6-9
High Prior
ity
: ≥10
Information Source
Scoring Criteria
Description
4319
-03-2-R2 West Branch Salmon Brook
0
0
1
2
0
3
Mostly wooded with minimal
residential areas
2
0
0
0
1
9 Problem
4319-04-1 West Branch Salmon Brook
0
0
2
2
0
3
Mostly wooded with minimal
residential/agricultural areas
1
0
0
1
9 Problem
4319-05-1 West Branch Salmon Brook
0
0
1
1
0
3
Wooded with dense
residential area E of stream
1
0
0
2
8 Problem
4319-06-1 Higley Brook
0
0
1
1
0
0
Woode
d with minimal cleared
land f
or residential
2
0
0
0
0
4 Low Priority
4319-07-1 Beach Brook
0
0
1
2
0
3
Mostly wooded with minor
residential areas towards
lower end of stream
1
0
0
1
8 Problem
4319-08-1 Kendall Brook
0
0
1
1
0
3
A mixture of wooded,
agricultural, and residential
parcels
2
0
0
0
1
8 Problem
4319-09-1 West Branch Salmon Brook
0
0
1
2
0
3
Mostly wooded; little
residential
0
0
0
1
7 Problem
4319-10-2-L1 West Branch Salmon Brook
0
0
1
2
0
3
Mostly wooded; little
agricultural/residential
2
0
0
0
1
9 Problem
4319-10-2-L2
West Branch Salmon
Brook; Trout Pond
0
0
1
1
0
0
Wooded
0
0
0
0
2 Low Priority
4319-10-2-R1 West Branch Salmon Brook
0
0
1
1
0
0
Wooded
0
0
0
0
2 Low Priority
4319-11-1 West Branch Salmon Brook
0
0
1
2
0
0
Wooded
0
0
0
0
3 Low Priority
4320-00-1 Unnamed Stream
0
0
1
1
0
0
Wooded with minimal
residential; large mansion
with cleared
land in Southeast
catchme
nt
0
0
0
1
3 Low Priority
Page 2 of 6Page 239
Town of Granb
y
Catchment Assessment
and
Priority Ranking Matrix
Catc
hment ID Receiving Water
Previous Screening
Results Indicate
Likely Sewer Input?
1
Discharging to
Area of Concern
to Public Health?
2
Frequ
ency of
Past Discharge
Complaints
Receiving
Water
Quality
3
Density of
G
enerating Sites
4
Age of Develo
pment/
Infrastructure
5
Historic
Combin
ed
Sewers or
Septic?
6
Aging
Sep
tic?
7
Culverted
Streams?
8
Additional Chara
cteristics
Sewer Repair
Nearby?
Urbanized Area DCIA >11% Impaired Waterbody
Additional
Characteristics
Score
Catchment
inspections and
sample results
GIS Maps Municipal Staff
Impaired
Waters List
Land Use/GIS
Maps, Aerial
Photography
Land Use Information,
Visual Observation
Municipal Staff,
GIS Maps
Land Use,
Municipal
Staff
GIS and Storm
System Maps
Other
Municipal Staff, GIS
Maps
CLEAR
Nathan L. Jacobson &
Associates
CLEAR
Other
Yes = 3 (Pr
oblem
Catchm
ent)
Yes = 3 Freque
nt = 3 Poor = 3 High = 3
High = 3
Yes = 3 Yes = 3 Yes = 3
Yes=2
Yes =1
Yes =1
Yes =1
High = 3
No = 0
No = 0 Occasional = 2 Fair = 2 Medium = 2 Medium = 2 No = 0 No = 0 No = 0
No=0
No = 0
No = 0
No = 0 Medium =1-2
None = 0 Good = 0 Low = 1
Low = 1
Low = 0
Score
Priority Ranking
Low Priority:
0-5
Problem
: 6-9
High Prior
ity
: ≥10
Information Source
Scoring Criteria
Description
4320
-00-2-R1 Unnamed Stream
0
0
1
1
0
0
Woode
d with small residential
develop
ment
2
0
0
0
1
5 Low Priority
4320-00-2-R2 Fox Brook
0
0
1
1
0
3
Mostly wooded with some
agricultural land along Hwy 89
0
0
0
1
6 Problem
4320-00-2-R3 East Branch Salmon Brook
0
0
1
2
0
0
Mostly agricultural with some
wooded
0
0
0
2
5 Problem
4320-00-2-R4 East Branch Salmon Brook
0
0
1
2
0
0
Mostly wooded with minimal
residential
0
0
0
1
4 Problem
4320-00-3-L1 Dismal Brook
0
0
1
2
0
0 Commercial/Agricultural
2
1
0
0
2
8 Problem
4320-00-3-R1 East Branch Salmon Brook
0
0
1
2
0
3
Wooded with residential sites
in the SE catchment and one
plot of agricutural land
0
0
0
1
7 Problem
4320-00-3-R2 West Branch Salmon Brook
0
2
1
2
0
0
Wooded with agricultural and
residential land East of stream
1
0
1
2
9 Problem
4320-00-3-R3 Mountain Brook
0
0
1
2
0
0
Agricultural
2
1
0
0
2
8 Problem
4320-00-3-R4 West Branch Salmon Brook
0
2
1
2
0
0 Mostly residential/agricultural
0
0
1
2
8 Problem
4320-00-3-R5 West Branch Salmon Brook
0
2
2
2
0
3 Mostly residential/commercial 2
1
0
1
3
16 High Priority
4320-00-3-R6 West Branch Salmon Brook
0
2
1
2
0
0
Residential with some
agricultural land
1
0
1
2
9 Problem
4320-00-4-R1 East Branch Salmon Brook
0
0
2
2
0
3
Tariffvill
e Park, residential and
mode
rate commercial areas
2
1
0
0
3
13 High Priority
4320-00-4-R2 Salmon Brook
0
0
1
2
0
3
Mostly Agricultural with some
residential and wooded
1
0
0
1
8 Problem
Page 3 of 6Page 240
Town of Granb
y
Catchment Assessment
and
Priority Ranking Matrix
Catc
hment ID Receiving Water
Previous Screening
Results Indicate
Likely Sewer Input?
1
Discharging to
Area of Concern
to Public Health?
2
Frequ
ency of
Past Discharge
Complaints
Receiving
Water
Quality
3
Density of
G
enerating Sites
4
Age of Develo
pment/
Infrastructure
5
Historic
Combin
ed
Sewers or
Septic?
6
Aging
Sep
tic?
7
Culverted
Streams?
8
Additional Chara
cteristics
Sewer Repair
Nearby?
Urbanized Area DCIA >11% Impaired Waterbody
Additional
Characteristics
Score
Catchment
inspections and
sample results
GIS Maps Municipal Staff
Impaired
Waters List
Land Use/GIS
Maps, Aerial
Photography
Land Use Information,
Visual Observation
Municipal Staff,
GIS Maps
Land Use,
Municipal
Staff
GIS and Storm
System Maps
Other
Municipal Staff, GIS
Maps
CLEAR
Nathan L. Jacobson &
Associates
CLEAR
Other
Yes = 3 (Pr
oblem
Catchm
ent)
Yes = 3 Freque
nt = 3 Poor = 3 High = 3
High = 3
Yes = 3 Yes = 3 Yes = 3
Yes=2
Yes =1
Yes =1
Yes =1
High = 3
No = 0
No = 0 Occasional = 2 Fair = 2 Medium = 2 Medium = 2 No = 0 No = 0 No = 0
No=0
No = 0
No = 0
No = 0 Medium =1-2
None = 0 Good = 0 Low = 1
Low = 1
Low = 0
Score
Priority Ranking
Low Priority:
0-5
Problem
: 6-9
High Prior
ity
: ≥10
Information Source
Scoring Criteria
Description
4320
-00-4-R3 Salmon Brook
0
0
2
2
0
0
Mostly Agricultural
1
0
0
1
6 Problem
4320-00-4-R4 Salmon Brook
0
0
1
1
0
0
Largely Agricultural
0
0
0
1
3 Low Priority
4320-01-1 Belden Brook
0
0
1
1
0
3
Mostly wooded; Peck Orchard
in Northwest of catchment
1
0
0
1
7 Problem
4320-02-1
Fox Brook
0
0
1
2
0
3
Moslty Wooded with some
residential/commercial
1
0
0
1
8 Problem
4320-03-1
Salmon Brook, unnamed
stream
0
0
1
2
0
3
Mostly residential/wooded
with intermittnet cleared land
2
1
0
0
2
11 High Priority
4320-04-1 East Branch Salmon Brook
0
0
1
2
0
3
Mostly wooded with some
agricultural and residential
land
0
0
0
1
7 Problem
4320-05-2-R1 Belden Brook
0
0
1
1
0
0
Mostly wooded with a small
orchard in Northeastern
region of catchment
0
0
0
1
3 Low Priority
4320-05-2-R2 Belden Brook
0
0
1
2
0
3
Wooded with some
residential
2
1
0
0
1
10 High Priority
4320-07-1
Ring Brook
0
0
1
1
0
0
Mostly wooded with one road
of residential
0
0
0
1
3 Low Priority
Page 4 of 6Page 241
Town of Granb
y
Catchment Assessment
and
Priority Ranking Matrix
Catc
hment ID Receiving Water
Previous Screening
Results Indicate
Likely Sewer Input?
1
Discharging to
Area of Concern
to Public Health?
2
Frequ
ency of
Past Discharge
Complaints
Receiving
Water
Quality
3
Density of
G
enerating Sites
4
Age of Develo
pment/
Infrastructure
5
Historic
Combin
ed
Sewers or
Septic?
6
Aging
Sep
tic?
7
Culverted
Streams?
8
Additional Chara
cteristics
Sewer Repair
Nearby?
Urbanized Area DCIA >11% Impaired Waterbody
Additional
Characteristics
Score
Catchment
inspections and
sample results
GIS Maps Municipal Staff
Impaired
Waters List
Land Use/GIS
Maps, Aerial
Photography
Land Use Information,
Visual Observation
Municipal Staff,
GIS Maps
Land Use,
Municipal
Staff
GIS and Storm
System Maps
Other
Municipal Staff, GIS
Maps
CLEAR
Nathan L. Jacobson &
Associates
CLEAR
Other
Yes = 3 (Pr
oblem
Catchm
ent)
Yes = 3 Freque
nt = 3 Poor = 3 High = 3
High = 3
Yes = 3 Yes = 3 Yes = 3
Yes=2
Yes =1
Yes =1
Yes =1
High = 3
No = 0
No = 0 Occasional = 2 Fair = 2 Medium = 2 Medium = 2 No = 0 No = 0 No = 0
No=0
No = 0
No = 0
No = 0 Medium =1-2
None = 0 Good = 0 Low = 1
Low = 1
Low = 0
Score
Priority Ranking
Low Priority:
0-5
Problem
: 6-9
High Prior
ity
: ≥10
Information Source
Scoring Criteria
Description
4320
-08-1 Mountain Brook
0
0
1
2
0
0
Mostly wooded with light
residential areas and a natual
diversity area in Northeast
corner of catchment.
2
0
0
0
1
6 Problem
4320-09-1
Dismal Brook; unnamed
ponds
0
0
1
2
0
3
Mostly woode
d with light
residen
tial areas and cleared
land
1
0
0
1
8 Problem
43
20-10-1 West Branch Salmon Brook
0
0
2
2
0
3
Mostly Residential
2
1
0
0
2
12 High Priority
4320-10-2-R1 West Branch Salmon Brook
0
0
1
1
0
0
Wooded
2
0
0
1
0
5 Low Priority
4320-11-1 Salmon Brook
0
0
2
2
0
0
Agricultural
2
0
0
0
1
7 Problem
4320-12-1 Bradley Brook
0
0
2
2
0
3
Mostly residential with some
cleared land and wooded
areas; Intermediate School
2
1
0
0
2
12 High Priority
4320-12-2-R1 Salmon Brook
0
0
1
1
0
0
Wooded
0
0
0
0
2 Low Priority
4320-13-1 Salmon Brook
3
0
1
1
0
3
Wooded with some
residential; recreational lake
in NE catchment
0
0
0
1
9 Problem
4320-13-1-L1
Manitook Lake; Unnamed
Stream
3
0
2
2
0
0
Commercial
(Masonry/Concrete quarry);
recreational (Lake)
2
1
0
0
3
13 High Priority
4320-14-1 Kendall Brook
0
0
2
2
0
3
Residential with some
comme
rcial including a school.
2
1
0
0
3
13 High Prior
ity
4320-15-2-R1 Hungary Brook
0
0
2
2
0
3
Moslty residential with one
large farm and some cleared
land
1
0
0
2
10 High Priority
4320-15-3-R1 Salmon Brook
0
0
2
2
0
3
Residential with some cleared
land
2
1
0
0
2
12 High Priority
4320-16-1
Beaverdam Marsh, Great
Marsh, unnamed stream,
Newgate Pond
0
0
1
2
0
3
Mostly wooded with light
residetntial areas along
Copper Hill Rd.
2
1
0
0
1
10 Problem
4320-17-1 Unnamed Stream
0
0
2
2
0
3
Mostly residential with some
cleared land and minimal
agricultural land
2
1
0
0
2
12 High Priority
Page 5 of 6Page 242
Town of Granb
y
Catchment Assessment
and
Priority Ranking Matrix
Catc
hment ID Receiving Water
Previous Screening
Results Indicate
Likely Sewer Input?
1
Discharging to
Area of Concern
to Public Health?
2
Frequ
ency of
Past Discharge
Complaints
Receiving
Water
Quality
3
Density of
G
enerating Sites
4
Age of Develo
pment/
Infrastructure
5
Historic
Combin
ed
Sewers or
Septic?
6
Aging
Sep
tic?
7
Culverted
Streams?
8
Additional Chara
cteristics
Sewer Repair
Nearby?
Urbanized Area DCIA >11% Impaired Waterbody
Additional
Characteristics
Score
Catchment
inspections and
sample results
GIS Maps Municipal Staff
Impaired
Waters List
Land Use/GIS
Maps, Aerial
Photography
Land Use Information,
Visual Observation
Municipal Staff,
GIS Maps
Land Use,
Municipal
Staff
GIS and Storm
System Maps
Other
Municipal Staff, GIS
Maps
CLEAR
Nathan L. Jacobson &
Associates
CLEAR
Other
Yes = 3 (Pr
oblem
Catchm
ent)
Yes = 3 Freque
nt = 3 Poor = 3 High = 3
High = 3
Yes = 3 Yes = 3 Yes = 3
Yes=2
Yes =1
Yes =1
Yes =1
High = 3
No = 0
No = 0 Occasional = 2 Fair = 2 Medium = 2 Medium = 2 No = 0 No = 0 No = 0
No=0
No = 0
No = 0
No = 0 Medium =1-2
None = 0 Good = 0 Low = 1
Low = 1
Low = 0
Score
Priority Ranking
Low Priority:
0-5
Problem
: 6-9
High Prior
ity
: ≥10
Information Source
Scoring Criteria
Description
4320
-17-2-R1 Unnamed Stream
0
0
1
1
0
3
Wooded with some rural
residential areas
0
0
0
1
6 Problem
4320-17-3-R1 Salmon Brook
0
0
1
1
0
0
Wooded with some
agriculture
0
0
0
1
3 Low Priority
4320-21-1 Salmon Brook
0
0
1
2
0
0
Agricultura
l with some
wooded
0
0
0
1
4 Problem
43
20-21-1-L1
Salmon B
rook; Sumatra
Pond
0
0
2
2
0
0 Comme
rcial and Agricultural
1
0
0
3
8 Problem
4320-22-1 Unnamed Stream
0
0
1
2
0
3
Mostly Agricultural with some
wooded and minimal
residential
1
0
0
2
9 Problem
4320-26-1-L1 Salmon Brook
0
0
2
2
0
0 Agricultural and Residential
2
1
0
0
2
9 Problem
Scoring Criteria:
1
Previous screen
ing results indicate likely sewer input if any of the following are true:
Olfactory o
r visual evidence of sewage,
Ammo
nia ≥ 0.5 mg/L, surfactants ≥ 0.25 mg/L, and bacteria levels greater than the water quality criteria applicable to the receiving water, or
Ammo
nia ≥ 0.5 mg/L, surfactants ≥ 0.25 mg/L, and detectable levels of chlorine
2
Catchm
ents that discharge to or in the vicinity of any of the following areas: public beaches, recreational areas, drinking water supplies, or shellfish beds
3
Receiving water
quality based on latest version of State of Connecticut Integrated Water Quality Report.
Page 6 of 6Page 243
APPENDIX H SLOPE PROTECTION AND SWALE CALCULATIONS
Page 244
PROJECT: Computed by: EAR 10/9/2025 PROJECT NO.: Checked By: SDG 10/13/2025 TOWN: ROUTE: 10 Year Design Storm is being used for the Velocity Calculations Location: Q Bypass Flow (CFS) = 0.770 A Area of Flow Section (SF) = 4.343 V Velocity of Flow (FPS) = 3.344 3.34 FPS Location: Q Bypass Flow (CFS) = 0.200 A Area of Flow Section (SF) = 2.843 V Velocity of Flow (FPS) = 0.569 0.57 FPS *Q=A*V PASSES FOR ALLOWABLE VELOCITY (GRAVEL) PASSES FOR ALLOWABLE VELOCITY (GRAVEL) STA 12+14.00, 15.00 RT *Value from ORD Drainage Model for 10 yr Storm *Spread; Value from Gutter Flow Analysis SIMSBURY RD OVER WEST BRANCH SALMON BROOK 0055-0145 Granby, CT Simsbury Road Allowable Velocities for Various Soil Textures STA 12+71.00, 15.00 LT *Value from ORD Drainage Model for 10 yr Storm *Spread; Value from Gutter Flow Analysis *Q=A*V
Page 245
PROJECT: Computed by: EAR 10/9/2025 PROJECT NO.: Checked By: SDG 10/13/2025 TOWN: ROUTE: (Temporary lining requires 2-year design, 10-year being used for conservative analysis) Location: DESIGN (10-yr) Input into Flowmaster, Triangular Channel Worksheet, solve for normal depth: Roughness Coefficient = 0.02 S, Channel Slope (ft/ft) = 0.04 Left Side Slope (H:V) = 6 Right Side Slope (H:V) = 6 Discharge (cfs) = 1.13 Output from Flowmaster: A, Flow Area (sf) = 0.30 R, Hydraulic Radius (ft) = 1.400 V, Velocity (fps) = 3.51 d, Depth (ft) = 0.23 γ, Unit Weight of Water (lb/cf) = 62.4 τ, Average Shear (lb/sf) = 3.49 τd, Max Shear (lb/sf) = 0.58 Location: DESIGN (10-yr) Roughness Coefficient = S, Channel Slope (ft/ft) = Left Side Slope (H:V) = Right Side Slope (H:V) = Discharge (cfs) = Output from Flowmaster: A, Flow Area (sf) = R, Hydraulic Radius (ft) = V, Velocity (fps) = d, Depth (ft) = γ, Unit Weight of Water (lb/cf) = 62.4 τ, Average Shear (lb/sf) = 0.00 τd, Max Shear (lb/sf) = 0.00 16+31.00, 21.00 RT **Assume Type G SIMSBURY RD OVER WEST BRANCH SALMON BROOK 0055-0145 Granby, CT Simsbury Road Swale Shear
Page 246
Worksheet for Triangular Swale - STA 18+15 TO STA 16+31 Project Description Manning FormulaFriction Method Normal DepthSolve For Input Data 0.020Roughness Coefficient ft/ft0.040Channel Slope H:V6.000Left Side Slope H:V6.000Right Side Slope cfs1.13Discharge Results in2.8Normal Depth ft²0.3Flow Area ft2.8Wetted Perimeter in1.4Hydraulic Radius ft2.78Top Width in3.5Critical Depth ft/ft0.011Critical Slope ft/s3.51Velocity ft0.19Velocity Head ft0.42Specific Energy 1.815Froude Number SupercriticalFlow Type GVF Input Data in0.0Downstream Depth ft0.0Length 0Number Of Steps GVF Output Data in0.0Upstream Depth N/AProfile Description ft0.00Profile Headloss ft/sInfinityDownstream Velocity ft/sInfinityUpstream Velocity in2.8Normal Depth in3.5Critical Depth ft/ft0.040Channel Slope ft/ft0.011Critical Slope Page 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/15/2025 FlowMaster [10.03.00.03] Bentley Systems, Inc. Haestad Methods Solution Center0055-01145 Swale Calculations.fm8
Page 247
APPENDIX I OUTLET PROTECTION CALCULATIONS
Page 248
PROJECT: Computed by: EAR 10/9/2025 PROJECT NO.: Checked By: SDG 10/14/2025 TOWN: ROUTE: Length: Per CTDOT Drainage Manual Section 11.13.5 SIMSBURY RD OVER WEST 0055-0145 Granby, CT Simsbury Road Outlet Protection Type C riprap apron recommended due to assumed defined vegetation downstream of outlet protection. Location: STA 17+89.00, 20.00' LT 1 of 5
Page 249
PROJECT: Computed by: EAR 10/9/2025 PROJECT NO.: Checked By: SDG 10/14/2025 TOWN: ROUTE: SIMSBURY RD OVER WEST 0055-0145 Granby, CT Simsbury Road Outlet Protection Type C riprap apron recommended due to assumed defined vegetation downstream of outlet protection. Location: STA 17+89.00, 20.00' LT DESIGN (10-yr) Check (25-yr) Q (cfs) = 1.72 2.07 Sp (ft) = 1.5 1.5 La (ft) = 4.64 5.22 Width: **SAY 12' based on min length for 18" 2 of 5
Page 250
PROJECT: Computed by: EAR 10/9/2025 PROJECT NO.: Checked By: SDG 10/14/2025 TOWN: ROUTE: SIMSBURY RD OVER WEST 0055-0145 Granby, CT Simsbury Road Outlet Protection Type C riprap apron recommended due to assumed defined vegetation downstream of outlet protection. Location: STA 17+89.00, 20.00' LT 3 of 5
Page 251
PROJECT: Computed by: EAR 10/9/2025 PROJECT NO.: Checked By: SDG 10/14/2025 TOWN: ROUTE: SIMSBURY RD OVER WEST 0055-0145 Granby, CT Simsbury Road Outlet Protection Type C riprap apron recommended due to assumed defined vegetation downstream of outlet protection. Location: STA 17+89.00, 20.00' LT DESIGN (10-yr) Check (25-yr) Q (cfs) = 1.72 2.07 Sp (ft) = 1.50 1.50 Rp (ft) = 1.50 1.50 Z = 1.00 1.00 TWE (ft) = 0.32 0.35 Cb (ft) = 3.00 3.00 W (ft) = 3*Sp 4.50 4.50 W (ft) = 2(Z)(TWE+1')+Cb 5.64 5.70 W (ft) = 2(Z)(0.7Rp)+Cb 5.10 5.10 Max W (ft) = 5.64 5.70 **SAY 6' Riprap: Input into Flowmaster, Trapezoidal Channel Worksheet, solve for normal depth: DESIGN (10-yr) Check (25-yr) Roughness Coefficient = 0.069 0.069 S, Channel Slope (ft/ft) = 0.05 0.05 n for d50 of 6" (Modified)= 0.069 Left Side Slope (H:V) = 2.0 2.0 n for d50 of 8" (Intermediate) = 0.072 Right Side Slope (H:V) = 2.0 2.0 n for d50 of 12" = 0.078 B, Bottom Width (ft) = 3.00 3.00 Discharge (cfs) = 1.72 2.07 Output from Flowmaster: A, Flow Area (sf) = 1.00 4.90 R, Hydraulic Radius (ft) = 0.225 0.625 V, Velocity (fps) = 1.80 0.50 d, Depth (ft) = 0.267 0.300 γ, Unit Weight of Water (lb/cf) = 62.4 62.4 τ, Average Shear (lb/sf) = 0.70 1.95 τd, Max Shear (lb/sf) = 0.83 0.94 Figure 7-9: B/d = 11.25 10.00 Z = 2.0 2.0 K1 = 0.79 0.79 Test for modified riprap 4 of 5
Page 252
PROJECT: Computed by: EAR 10/9/2025 PROJECT NO.: Checked By: SDG 10/14/2025 TOWN: ROUTE: SIMSBURY RD OVER WEST 0055-0145 Granby, CT Simsbury Road Outlet Protection Type C riprap apron recommended due to assumed defined vegetation downstream of outlet protection. Location: STA 17+89.00, 20.00' LT Figure 7-10: Θ, Angle of Side Slope (°) = 26.6 26.6 φ, Angle of Repose (°) = 41.5 41.5 K2 = 0.74 0.74 τs, Side Shear (lb/sf) = 0.89 1.00 Recommend modified riprap Test for modified riprap 5 of 5
Page 253
Worksheet for Type C Apron STA 17+89.00, 20.00' LT- 10yr Project Description Manning FormulaFriction Method Normal DepthSolve For Input Data 0.069Roughness Coefficient ft/ft0.050Channel Slope H:V2.000Left Side Slope H:V2.000Right Side Slope ft3.00Bottom Width cfs1.72Discharge Results in3.2Normal Depth ft²1.0Flow Area ft4.2Wetted Perimeter in2.7Hydraulic Radius ft4.08Top Width in2.5Critical Depth ft/ft0.126Critical Slope ft/s1.80Velocity ft0.05Velocity Head ft0.32Specific Energy 0.653Froude Number SubcriticalFlow Type GVF Input Data in0.0Downstream Depth ft0.0Length 0Number Of Steps GVF Output Data in0.0Upstream Depth N/AProfile Description ft0.00Profile Headloss ft/s0.00Downstream Velocity ft/s0.00Upstream Velocity in3.2Normal Depth in2.5Critical Depth ft/ft0.050Channel Slope ft/ft0.126Critical Slope Page 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/15/2025 FlowMaster [10.03.00.03] Bentley Systems, Inc. Haestad Methods Solution Center0055-0145 Riprap Outlet Type C Calculations.fm8
Page 254
Worksheet for Type C Apron STA 17+89.00, 20.00' LT - 25yr Project Description Manning FormulaFriction Method Normal DepthSolve For Input Data 0.069Roughness Coefficient ft/ft0.050Channel Slope H:V2.000Left Side Slope H:V2.000Right Side Slope ft3.00Bottom Width cfs2.07Discharge Results in3.6Normal Depth ft²1.1Flow Area ft4.3Wetted Perimeter in3.0Hydraulic Radius ft4.20Top Width in2.8Critical Depth ft/ft0.122Critical Slope ft/s1.91Velocity ft0.06Velocity Head ft0.36Specific Energy 0.663Froude Number SubcriticalFlow Type GVF Input Data in0.0Downstream Depth ft0.0Length 0Number Of Steps GVF Output Data in0.0Upstream Depth N/AProfile Description ft0.00Profile Headloss ft/s0.00Downstream Velocity ft/s0.00Upstream Velocity in3.6Normal Depth in2.8Critical Depth ft/ft0.050Channel Slope ft/ft0.122Critical Slope Page 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/15/2025 FlowMaster [10.03.00.03] Bentley Systems, Inc. Haestad Methods Solution Center0055-0145 Riprap Outlet Type C Calculations.fm8
Minutes: archived copy, SHA-256 7c480914dc42…. Agenda: archived copy, SHA-256 3c7774eb665f…. Packet: sanitized copy, SHA-256 9281b4676c8c….