Summary of the minutes

AI-generated summary. Each line links to the PDF page it came from; check it before relying on it.

Read the official minutes (PDF, 2 pages) The PDF is the record; this summary is a guide to it.

At its January 14, 2026 meeting, the Commission approved the December 10, 2025 minutes and modified an enforcement order for 142R and 186 Case Street by removing the dam from item #1 and placing item #2 on hold pending DEEP's jurisdiction review. The Commission also received an agent report on an approved inground pool at 65 Cider Mill Heights and heard a town attorney training presentation.

Decisions (4) · all reported votes

  1. Approval of December 10, 2025 minutes
    Approved as presented
    Vote: Motion by A. Locke, seconded by F. Jones, the Commission voted 6-0-0 to approve the December 10, 2025, minutes as presented. · p. 1
  2. Enforcement Order, 142R and 186 Case Street (M. Reale c/o Scottinaleece, LLC), conducting a regulated activity without a valid IWWC Permit: modification of item #1 of the November 5, 2025 Enforcement Order
    Modified item #1 to exclude items related to the dam construction that may be under DEEP's jurisdiction, adding the revised language discussed (evaluations of the earthen dam may be addressed upon DEEP's review; information due within 30 days of DEEP's decision if the dam is deemed subject to municipal review)
    Vote: Motion by S. Okie, seconded by A. Locke, the Commission voted 5-0-1 to modify item #1 in the Enforcement Order issued November 5, 2025 to add the revised language as discussed. D. Tolli abstained. · p. 1
  3. Enforcement Order, 142R and 186 Case Street: stay on item #2 of the November 5, 2025 Enforcement Order
    Put item #2 on stay pending DEEP's review of jurisdiction
    Vote: Motion by S. Okie, seconded by F. Jones, the Commission voted 6-0-0 to put a stay on item #2 in the Enforcement Order issued November 5, 2025 pending DEEP's review of jurisdiction. · p. 1
  4. Adjournment
    Meeting adjourned at 8:32 p.m.
    Vote: Motion by S. Okie seconded by F. Jones, the Commission voted 6-0-0 to adjourn the meeting at 8:32 p.m. · p. 2

Also discussed (4)

  • Town Attorney training presentation re: Land Use Commission Training: Presentation given by Attorneys Rich Roberts and Ken Slater, followed by Commissioner questions and answers; no decision recorded · p. 1
  • Agent approval, 65 Cider Mill Heights (N. Goggin c/o Pool Boy Pools): inground swimming pool, 28' x 44', with patio and associated site improvements within a regulated area: Authorized Agent approval dated 1/7/26 reported to the Commission · p. 2
  • Station 280, 280 Salmon Brook Street site visit: Agent reported debris and garbage had been removed after December site visit; another site walk to be scheduled for spring to close out the project · p. 2
  • 37 Hartford Avenue potential development (informal discussion): Agent reported referral of potential applicant to application file; informal discussion may be held once more concrete plans and septic effluent information are determined · p. 2
Summary of the agenda: IWWC Agenda

AI-generated summary.

This is the agenda for the Town of Granby Inland Wetlands and Watercourses Commission regular hybrid meeting on January 14, 2026. Items include approving the December 10, 2025 minutes, a Town Attorney presentation on Land Use Commission training, an enforcement order for a regulated activity at 142R and 186 Case Street, and an agent report on a pool permit request at 65 Cider Mill Heights.

On the agenda (5)

  1. Action on the minutes of December 10, 2025 · p. 1
  2. Town Attorney Presentation re: Land Use Commission Training · p. 1
  3. Enforcement Order: 142R and 186 Case Street, M. Reale c/o Scottinaleece, LLC, conducting a regulated activity without a valid IWWC Permit · p. 1
  4. Agent Report: 65 Cider Mill Heights, N. Goggin c/o Pool Boy Pools, permit request to install a 28' x 44' inground swimming pool with patio and site improvements in a regulated area; Authorized Agent approval 1/7/26 · p. 1
  5. Materials display rules for videoconferenced meetings: Notice that materials must be emailed by 10 AM on the meeting day, and that zip drives, memory sticks and other data storage devices will not be accepted; no decision recorded. · p. 1

Full text of the documents

View the minutes PDF on this page (IWWC Minutes) Open the PDF
Text of the minutes (IWWC Minutes, 2 pages)

Page 1 · open in PDF

 
1 
MEETING MINUTES 
Town of Granby 
Inland Wetlands and Watercourses Commission 
Wednesday, January 14, 2026, at 7:00 pm 
 
PRESENT: Nick Dethlefsen, Dave Tolli, Sue Okie, John Laudati, Fred Jones, and Aurelle Locke 
PRESENT VIA ZOOM: Vickie Dirienzo 
ALSO PRESENT: IWWC Agent Kate Bednaz, Director of Community Development Abby Kenyon 
 
1. Call to Order 
Chair Laudati called the meeting to order at 7:01 p.m. 
 
2. Action on the minutes of December 10, 2025 
 
ON A MOTION by A. Locke, seconded by F. Jones, the Commission voted 6-0-0 to approve the December 
10, 2025, minutes as presented.  
 
3. Town Attorney Presentation re: Land Use Commission Training 
Attorneys Rich Roberts and Ken Slater presented to the Commission. The presentation included an overview 
of the Inland Wetlands and Watercourses Act, Commission jurisdiction, and enforcement procedures. An 
overview of meeting and hearing procedures was also provided, including when a public hearing is required, 
procedures for site visits, and information about ex-parte communication. The presentation included 
information about feasible and prudent alternatives and the basis for Commission decisions. The presentation 
was followed by Commissioner questions and answers. 
 
4. Enforcement Order 
a. 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated Activity 
without a valid IWWC Permit.  
K. Bednaz reported that at the last meeting, the property owner’s attorney cited the Wray case, noting that the 
IWWC enforcement is put on hold while DEEP determines their jurisdiction over the dam. The Town 
Attorney was consulted, and a memo included in the meeting packet. Per the Town Attorney’s memo, the 
IWWC can maintain jurisdiction over the activities conducted on the property, with the exception of the dam, 
while DEEP considers that. It was staff’s recommendation that the Enforcement Order be modified to remove 
reference to the dam, so the IWWC can continue enforcement activities on the other site activities that have 
occurred. 
 
The Commission reviewed the November 5, 2025 Enforcement Order and discussed items #1 and #2 in detail. 
It was decided to modify item #1 to exclude items related to the dam construction that may be under DEEP’s 
jurisdiction and to put item #2 on hold pending DEEP’s determination of jurisdiction. For item #1, the 
following language was suggested to be added, “Evaluations associated with the earthen dam and associated 
water control structure, including any directly adjacent resource areas may be addressed upon DEEP’s 
pending review of the dam structure and its jurisdiction. If the dam is deemed by DEEP to be subject to 
municipal review, all information as outlined in item #1 of this enforcement order must be submitted within 
30 days of the notification of DEEP’s decision.” 
 
ON A MOTION by S. Okie, seconded by A. Locke, the Commission voted 5-0-1 to modify item #1 in the 
Enforcement Order issued November 5, 2025 to add the revised language as discussed. D. Tolli abstained. 
 
ON A MOTION by S. Okie, seconded by F. Jones, the Commission voted 6-0-0 to put a stay on item #2 in 
the Enforcement Order issued November 5, 2025 pending DEEP’s review of jurisdiction.  

Page 2 · open in PDF

 
2 
 
5. Agent Report and Correspondence 
a.  65 Cider Mill Heights – N. Goggin c/o Pool Boy Pools – Permit request to install a 28’ x 44’ inground 
swimming pool inclusive of patio and associated site improvements within a regulated area. Authorized 
Agent approval 1/7/26. 
K. Bednaz reported that an application to construct an inground pool was approved for 65 Cider Mill Heights. 
The approval includes a patio around the pool, fence, and other associated pool equipment. She reported that 
the proposed pool is located to the rear of the house in an area that is currently lawn. The location is in the 
upland review area. K. Bednaz reported that there will be E&S measures in place. In response to questions, 
K. Bednaz explained that a concern with pools in the upland review area can be the discharge/emptying of 
the pool and impact of chlorine and pool chemicals on the resource area. It was noted in this case this could 
be done to the front of the house and the pool water could infiltrate the soil. In response to a question about 
chemical storage, it was noted that the property owner will most likely store these inside a structure and they 
won’t be exposed to the elements. 
 
K. Bednaz reported that she visited Station 280, 280 Salmon Brook Street, site in December. Debris and 
garbage had been removed. Another site walk will be schedule for the spring to close out the project. 
 
K. Bednaz reported that a potential applicant met informally with the Planning and Zoning Commission to 
discuss potential development plans for 37 Hartford Avenue. K. Bednaz has been in contact with the potential 
applicant and referred them to the application file to review previous submissions. K. Bednaz reported that 
the potential applicant asked about an informal discuss with the Commission. It was noted that an informal 
discussion may be held once more concrete plans are developed and the effluent information from the septic 
system is determined. 
 
6. Commissioner Reports and Correspondence 
N. Defthlefsen noted that he read an article about the solar project on the Monrovia property and plans for 
horizontal drilling. In response to a question, A. Kenyon noted that project will be submitted to the Siting 
Council and the Town will have an opportunity to review the plans. No plans have been submitted at this 
time. 
 
7. Adjourn 
 
ON A MOTION by S. Okie seconded by F. Jones, the Commission voted 6-0-0 to adjourn the meeting at 
8:32 p.m. 
 
Respectfully submitted, 
 
 
 
Abby Kenyon 
Director of Community Development 
View the agenda PDF on this page (IWWC Agenda) Open the PDF
Text of the agenda (IWWC Agenda, 1 page)

Page 1 · open in PDF

 
Please note: Any person who wishes to provide materials for display on the video monitors at an IWWC meeting where such 
monitors are being used to videoconference the meetings must email the materials no later than 10 AM on the day of the meeting. 
All materials must be contained in a single attachment to the email.  Materials received after the 10 AM deadline will not be 
accepted for display. Display of the materials is subject to all other rules and procedures of the IWWC. Zip drive, memory sticks 
and other data storage devices will not be accepted. 
AGENDA 
Regular Hybrid Meeting 
Town of Granby 
Inland Wetlands and Watercourses Commission 
Wednesday, January 14, 2026, at 7:00 pm 
Town Hall Meeting Room 
 
Live Stream Under “Shows and Spotlight”: www.gctv16.org 
Zoom: https://us02web.zoom.us/j/86794233156?pwd=aZlICEzzw8oEbjJAMnbaRu5fvvmJCH.1 
Call In: 929-205-6099 
Meeting ID: 867 9423 3156 
Passcode: 295439 
 
1. Call to Order 
 
2. Action on the minutes of December 10, 2025 
 
3. Town Attorney Presentation re: Land Use Commission Training 
 
4. Enforcement Order 
a. 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated 
Activity without a valid IWWC Permit.  
 
5. Agent Report and Correspondence 
a. 65 Cider Mill Heights – N. Goggin c/o Pool Boy Pools – Permit request to install a 28’ x 
44’ inground swimming pool inclusive of patio and associated site improvements within 
a regulated area. Authorized Agent approval 1/7/26. 
 
6. Commissioner Reports and Correspondence 
 
7. Adjourn 
View the packet PDF on this page (IWWC Meeting Packet) Open the PDF
Text of the packet (IWWC Meeting Packet, 16 pages)

Page 1 · open in PDF

 
Please note: Any person who wishes to provide materials for display on the video monitors at an IWWC meeting where such 
monitors are being used to videoconference the meetings must email the materials no later than 10 AM on the day of the meeting. 
All materials must be contained in a single attachment to the email.  Materials received after the 10 AM deadline will not be 
accepted for display. Display of the materials is subject to all other rules and procedures of the IWWC. Zip drive, memory sticks 
and other data storage devices will not be accepted. 
AGENDA 
Regular Hybrid Meeting 
Town of Granby 
Inland Wetlands and Watercourses Commission 
Wednesday, January 14, 2026, at 7:00 pm 
Town Hall Meeting Room 
 
Live Stream Under “Shows and Spotlight”: www.gctv16.org 
Zoom: https://us02web.zoom.us/j/86794233156?pwd=aZlICEzzw8oEbjJAMnbaRu5fvvmJCH.1 
Call In: 929-205-6099 
Meeting ID: 867 9423 3156 
Passcode: 295439 
 
1. Call to Order 
 
2. Action on the minutes of December 10, 2025 
 
3. Town Attorney Presentation re: Land Use Commission Training 
 
4. Enforcement Order 
a. 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated 
Activity without a valid IWWC Permit.  
 
5. Agent Report and Correspondence 
a. 65 Cider Mill Heights – N. Goggin c/o Pool Boy Pools – Permit request to install a 28’ x 
44’ inground swimming pool inclusive of patio and associated site improvements within 
a regulated area. Authorized Agent approval 1/7/26. 
 
6. Commissioner Reports and Correspondence 
 
7. Adjourn 

Page 2 · open in PDF

 
1 
MEETING MINUTES 
Town of Granby 
Inland Wetlands and Watercourses Commission 
Wednesday, December 10, 2025, at 7:00 pm 
 
PRESENT: Nick Dethlefsen, Dave Tolli, John Laudati, and Fred Jones 
PRESENT VIA ZOOM: Aurelle Locke, Sue Okie and IWWC Agent Kate Bednaz 
ALSO PRESENT: Land Use Coordinator Renee Deltenre 
 
1. Call to Order 
Chair Laudati called the meeting to order at 7:09 p.m. 
 
2. Action on the minutes of November 12, 2025 
 
ON A MOTION by D. Tolli seconded by F. Jones, the Commission voted 5-0-1 to approve the 
November 12, 2025, minutes as presented. D. Tolli abstained.  
 
3. Permit Requests 
a. 28 Copper Hill Road – D. Cote-Roy – Permit request to install a 192 square foot 
prefabricated shed on crushed stone within a regulated area. 
Applicant and property owner William Cote-Roy was present to discuss the application and 
answer any questions the Commission had. He is seeking permission to install at 12’ x 16’ 
prefabricated shed on crushed stone at the end of an existing driveway within a maintained 
lawn area with underground electrical. The proposed location is shown as wetlands based on 
current mapping, and IWWC Agent K. Bednaz conducted a site inspection to verify existing 
conditions and had no concerns. A draft approval letter was provided to the Commission for 
consideration.  
 
ON A MOTION by F. Jones seconded by D. Tolli, the Commission voted 6-0-0 to approve 
the application and draft approval letter as amended to reflect the installation of underground 
conduit for future electrical to the shed directly from the house. 
 
4. Town Attorney Presentation re: Land Use Commission Training 
Tabled 
 
5. Show Cause Hearing 
a. 249 Silver Street – B. Nickelsberg – Conducting a Regulated Activity without a valid 
IWWC Permit.  
This show cause hearing is a continuation from the November 12, 2025, regular meeting. 
IWWC Agent K. Bednaz spoke on behalf of the property owners, as they were unable to 
attend the meeting. A few weeks ago, town staff was notified of tree clearing underway 
adjacent to an existing pond at the subject property. Based on conversations with the owners, 
approximately 23 trees were cut down, along with some vegetation primarily consisting of 
invasive species. No stumps have been removed, all logs have been hauled away, and the 
exposed soils have been seeded with annual rye grass. The owners were seeking to create a 
better view of the pond from their home, unaware of the IWWC regulations, and are working 
with Horticulturalist Mark Lavoie to develop a mitigation plan. The mitigation plan was 
provided to the Commission for consideration and K. Bednaz recommended keeping this 
item on the agenda, as she continues monitoring the site throughout winter.  

Page 3 · open in PDF

 
2 
ON A MOTION by D. Tolli seconded by N. Dethlefsen, the Commission voted 6-0-0 to 
approve the mitigation plan as presented and continue the show cause hearing so staff can 
continue to monitor the site and provide updates as necessary.   
 
b. 142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated 
Activity without a valid IWWC Permit.  
This show cause hearing is a continuation from the October 8, 2025, and November 12, 2025, 
regular meetings. Attorney Janet Brooks was present via zoom on behalf of her client, Matt 
Reale, to provide updates regarding the Enforcement Order and actions that have been taken 
to date. On December 9, 2025, the property owner was issued a Notice of Violation from the 
Connecticut Department of Environmental Protection (DEEP) and has 60 days to comply 
with the corrective measures outlined. Attorney Brooks stated that jurisdiction now lies with 
DEEP and once action is taken and finalized, then the Town’s jurisdiction kicks in, if 
determined necessary. She discussed case law regarding a similar matter, and provided an 
overview of how the process will be handled moving forward. 
 
Soil Scientist David Lord was present to discuss how he will be involved in this process. He 
indicated that his first site visit was conducted on November 13, 2025, and he was retained to 
conduct wetland studies that will indicate functions and values, current conditions, and an 
impact assessment. K. Bednaz expressed concerns regarding weather conditions this time of 
year and meeting the 60-day deadline from DEEP. She also discussed the need to maintain 
erosion and sediment control measures and requested that the wetlands delineation include 
margins. J. Laudati indicated that the Town Attorney will review the Notice of Violation 
from DEEP, as well as the case law referenced. The show cause hearing was continued, and 
Attorney Brooks will provide updates, as necessary.  
 
6. Agent Report and Correspondence 
K. Bednaz indicated that a site inspection with town staff has been scheduled for December 18, 
2025, at the Station 280 Apartment complex.  
 
7. Commissioner Reports and Correspondence 
None 
 
8. Adjourn 
 
ON A MOTION by D. Tolli seconded by F. Jones, the Commission voted 6-0-0 to adjourn the 
meeting at 7:45 p.m. 
 
Respectfully submitted, 
 
 
 
Renee Deltenre 
Land Use Coordinator 
 

Page 4 · open in PDF

TOWN OF GRANBY 
MEMORANDUM 
 
TO:  Inland Wetlands and Watercourses Commission 
 
FROM: Abby Kenyon, Director of Community Development 
 
DATE:  January 8, 2026 
 
RE:  Overview and Status of IWWC Applications 
______________________________________________________________________________ 
 
The following provides an overview and status of applications and other items pending before 
the IWWC. 
 
Enforcement Order 
 
142R and 186 Case Street – M. Reale c/o Scottinaleece, LLC – Conducting a Regulated 
Activity without a valid IWWC Permit.  
 
An enforcement order has been issued for 142R and 186 Case Street. At the Commission’s 
December meeting, it was presented that DEEP’s involvement may take precedence over further 
enforcement action by the Commission. The Town Attorney has been consulted. As stated in the 
attached memo, the Commission may decide to continue to exercise jurisdiction over the 
activities that have been conducted with the exception of the dam, which may fall under DEEP. 
 
The Commission is asked to review the Town Attorney’s memo and consider if the items in the 
Enforcement Order that do not pertain to the dam should remain in effect. The Enforcement 
Order letter is also included in the meeting packet for reference. 
 
Agent Report and Correspondence 
 
65 Cider Mill Heights – N. Goggin c/o Pool Boy Pools – Permit request to install a 28’ x 44’ 
inground swimming pool inclusive of patio and associated site improvements within a 
regulated area. Authorized Agent approval 1/7/26. 
 
The applicant applied to construct an inground pool, patio, and other improvements at 65 Cider 
Mill Heights. The total disturbed area will be 28’ by 44’. Within this disturbed area, there will be 
a pool measuring 16’ by 32’, fence enclosure, and patio. This will all be located to the rear of the 
house. Silt fence will be installed to contain any sediment and all excess material will be trucked 
off site. These activities fall within the upland review area. The agent reviewed the application 
and approved it on January 7, 2026. 

Page 5 · open in PDF

  
 
 
LEGAL MEMORANDUM 
To: Richard Roberts 
 
From: Trent Kaisen 
 
Date: December 17, 2025 
 
Re: Enforcement Authority of the Town of Granby Inland Wetlands and 
Watercourses Commission – 142R and 186 Case Street (14501.0003) 
 
 
Background: The owner of 142R and 186 Case Street in Granby applied to the Town of Granby 
Inland Wetlands and Watercourses Commission (“IWWC”) for a jurisdictional ruling concerning 
forestry activities on the Property. The IWWC determined that the proposed forestry activities 
could proceed without a wetlands permit. The owner, however, undertook extensive activities that 
far exceeded forestry, including construction of a roadway using imported fill, excavation of a 
pond, and construction of a dam. In response, the IWWC issued an Enforcement Order on October 
1 addressing the unpermitted activities. After additional regulated activities occurred following 
issuance of the first order, the IWWC issued a second Enforcement Order on November 5. The 
Connecticut Department of Energy and Environmental Protection (“DEEP”) was notified and is 
currently evaluating whether the constructed feature constitutes a jurisdictional dam and, if so, the 
spatial bounds of its jurisdiction. 
 
Question Presented: What authority, if any, does the Town of Granby IWWC retain to issue 
enforcement orders or make regulatory determinations concerning activities on the Property while 
DEEP is assessing the jurisdictional bounds of the dam? 
 
Short Answer: DEEP has exclusive jurisdiction over the dam itself and any wetlands impacts 
integral to its construction or modification. That exclusivity does not extend to the remainder of 
the Property. The Town of Granby IWWC retains full authority to enforce the Inland Wetlands 
and Watercourses Regulations with respect to unpermitted regulated activities occurring outside 
the dam’s jurisdictional bounds, including fill placement, grading, excavation, and roadway 
construction that exceeded the approved forestry activities. 
 
Discussion: Connecticut law establishes a limited and activity-specific preemption in favor of 
DEEP with respect to dams. Under General Statutes § 22a-401 and its implementing regulations, 
DEEP regulates dam construction and modification “to the exclusion of local inland wetlands 
agencies.” This exclusion, however, is confined to the dam and those activities that are functionally 
integral to its construction, repair, or modification. It does not divest municipal inland wetlands 
agencies of jurisdiction over unrelated regulated activities elsewhere on the same parcel. 
 
The Supreme Court has cautioned that “[l]ocal inland wetland bodies are not little environmental 
protection agencies” and have authority only within their jurisdictional limits. Samperi v. Inland 

Page 6 · open in PDF

 
 
Wetlands Agency, 226 Conn. 579, 599 (1993). At the same time, those jurisdictional limits are 
defined by the nature and location of the regulated activity, not by parcel ownership. 
 
In Wray v. New Canaan Inland Wetlands and Watercourses Commission, the Superior Court held 
that the local commission exceeded its authority by approving a wetlands permit that licensed work 
“part and parcel of the dam repair work” subject to DEEP’s exclusive jurisdiction. The court 
emphasized that “[t]he chief issue is not whether the license encroached on the jurisdiction of the 
state, which … it clearly did,” and explained that the permit could not be salvaged because the 
dam-related work was “an integral part of the license.” Importantly for present purposes, the court 
reaffirmed that municipal agencies may regulate activities outside state jurisdiction, noting that 
regulations expressly allow a local agency to “review the remaining portions of the application” 
that are not subject to DEEP control.”  
 
Similarly, in Phoenix Horizon Corp. v. North Canaan Inland Wetlands Conservation Commission, 
the court addressed the interaction between municipal wetlands authority and DEEP’s dam 
jurisdiction where an applicant sought approval for a project involving dam construction. The court 
concluded that, while DEEP’s review was pending, “no one, not the plaintiff, not the Commission, 
and not the Court, has any indication of what jurisdictional area might remain to the town” with 
respect to the dam-related proposal. On that basis, the court held that the municipal commission 
lacked authority to grant the application. Crucially, the court’s analysis was limited to the proposed 
dam and its associated impacts, explaining that DEEP’s review “preempted the ability of the 
Commission to review the wetlands application before it” only insofar as the application concerned 
dam construction and detention basin impacts. 
 
Applied here, these cases support a clear jurisdictional delineation. The Town of Granby lacks 
authority to regulate the dam itself or any wetlands impacts that DEEP ultimately determines are 
integral to its construction or modification. That includes the dam structure, appurtenant features 
necessary to its function, and wetlands disturbances that cannot be separated from the dam work.  
 
Conversely, the Town retains jurisdiction over all other regulated areas of the property, including 
wetlands and watercourses affected by road construction, imported fill, grading, and excavation 
that are not within the dam’s jurisdictional footprint and were not disclosed or authorized as part 
of the forestry ruling. 
 
Unlike Wray, the Town has not approved dam-related work. Unlike Phoenix Horizon, the Town 
is not acting on a discretionary permit application but enforcing against completed and ongoing 
regulatory violations. DEEP’s pending determination informs where the line of state jurisdiction 
will be drawn, but it does not suspend municipal authority elsewhere on the site. As a practical 
matter, the Town may wish to suspend its enforcement until DEEP has determined the strict 
demarcation of its exclusive authority; however, for those areas of the Property which are clearly 
unrelated and not “integral” to the dam work, it is not required to do so. 
 
In light of the governing statutes and the holdings in Wray and Phoenix Horizon, the Town should 
proceed on the understanding that its enforcement authority remains intact, but must be exercised 
with precision. It is beneficial that the Town has documented, the distinction between the original 
forestry ruling and the subsequent unpermitted activities, as well as the Town’s reliance on DEEP 
to define the dam jurisdiction. Doing so will strengthen the Town’s position in any potential 
administrative appeal by showing that the IWWC did not act precipitously beyond its authority, 

Page 7 · open in PDF

 
 
but instead enforced its regulations in a manner consistent with the law while respecting the limits 
of state preemption.  
 
Furthermore, during the IWWC meeting on December, 10, 2025, counsel for the property owner 
testified that she had communicated with DEEP personnel who noted that if DEEP did not 
determine that what was constructed to be a “high hazard” dam, it would leave enforcement over 
the dam and all other aspects of the Enforcement Order to the Town. 
 
Therefore, The IWWC may continue to enforce against all unpermitted regulated activities on the 
Property that are clearly outside the physical and functional footprint of the dam, including 
roadway construction with imported fill, grading, excavation, and any wetlands or watercourse 
impacts not integral to the dam’s construction or operation. Those activities were neither disclosed 
to nor authorized by the IWWC and fall squarely within its jurisdiction. 
 
At the same time, the Town should avoid issuing orders or directives that purport to regulate the 
dam structure itself or require corrective action within areas that DEEP may ultimately determine 
to be within its exclusive jurisdiction. To minimize litigation risk, enforcement communications 
should expressly acknowledge DEEP’s pending review and clarify that any municipal compliance 
obligations apply only to areas outside the dam’s jurisdictional bounds, as determined by DEEP. 
The Town should feel free to contact DEEP regarding its ongoing review of this matter and may 
seek regular notices from the property owner regarding DEEP’s pending review to get updated 
statuses. 
 
Conclusion: Practically, this means that the existing Enforcement Orders are defensible so long 
as they are interpreted and, if necessary, clarified to carve out the dam and its appurtenant features. 
If DEEP’s determination identifies discrete jurisdictional limits, the Town should promptly align 
its enforcement posture to those limits rather than suspending enforcement wholesale. This 
preserves the Town’s regulatory authority, prevents further unauthorized environmental impacts, 
and demonstrates good-faith coordination with DEEP. 
10115403.v1 

Page 8 · open in PDF

TOWN OF GRANBY 
Incorporated 1786 
15 North Granby Road 
Granby, Connecticut 06035-2102 
 
November 5, 2025 
Certified Mailing #9489 0090 0027 6649 9929 24 
 
 
Matt Reale 
c/o SCOTTINALEECE, LLC 
96 Daniel Trace 
Burlington, CT 06013 
 
Re: Second Enforcement Order: 142R & 186 Case Street, West Granby, CT 06090 
(MBLU: I-20/66/37 & H-20/66/31)  
Conducting a Regulated Activity without a valid IWWC Permit/Determination 
 
Dear Mr. Reale: 
 
On October 1, 2025, an Enforcement Order (EO) was issued regarding regulated activities that were 
conducted without a valid IWWC Permit at 142R and 186 Case Street. The Town of Granby was notified 
that activities conducted on said properties were beyond that determined by the RFR to be as-of-right 
activity on 5/8/24 by the Town of Granby Inland Wetland and Watercourses Commission. The RFR 
request that was determined on 5/8/24 was for the thinning out of weak or dying trees and one (1) 
temporary stream crossing associated with creation of timber access roads as shown on the RFR aerial 
sketch with harvesting boundary, and as also included on the Notification of Timber Harvest to the CT 
DEEP. The work completed was far more extensive and is not included in the existing determination for 
the properties as documented during the 9/12/25 and 9/17/25 site visits. As directed in the 10/1/25 EO 
and at the 10/8/25 Show Cause Hearing, you were to cease all on-site activity. A 10/24/25 site visit 
conducted by the Wetlands Agent and drive by inspections on 10/29/25 and 10/30/25 by the Zoning 
Enforcement Officer show that you are still conducting regulated activities. 
 
The following regulated activities were conducted on the properties without a valid permit/determination, 
as outlined in the October 1, 2025, EO: 
 
1. Clearing of timber outside of the approved harvest boundary area. The clearing area extends 
throughout the mapped wetland area based on the GIS map and also includes likely unmapped 
wetland resource areas. While the area has not been totally clear-cut as some trees remain, based 
on aerial photos of the property prior to tree removal, the portion of trees removed appears to be 
many more than those that remain.  
2. The creation of an access road when only a skid trail was approved. 
3. Skid trails are not in approved locations.  
4. The extensive excavation, diversion, and filling of a watercourse and wetlands to create a pond and 
driveway crossing.  
a. This includes impacts to the downstream wetland and watercourse from sedimentation from earth 
work and tree removal activities, potentially beyond the property boundary. 
5. Woody debris/fill has been placed within wetlands and watercourses in locations beyond the 
watercourse crossing described in Item 4.  
 
Since the EO was issued on October 1, 2025, the following activities were observed without a valid 
permit/determination: 
 
1. Stockpiling of fill on-site. 
2. The creation of a dam and pouring of concrete.  
 
  

Page 9 · open in PDF

2nd EO – 142R & 186 Case Street, Granby CT 
11/5/25 
Page 2 of 3 
In accordance with the Town of Granby Inland Wetland and Watercourses Regulations, the work that 
occurred is considered a regulated activity as defined in said regulations and requires a permit application 
be filed and an approval letter or determination to be issued before commencing such activities in 
accordance with Section 6 of the regulations. These regulations can be viewed at the Granby Town Hall 
in the Office of Community Development or online at: https://www.granby-
ct.gov/DocumentCenter/View/387/Wetlands-Regulations-PDF 
 
No approval for this work has been granted and therefore, is in violation of the regulations. In accordance 
with Section 14 of the IWWR, this Enforcement Order (EO) is issued and a hearing on this matter will be 
held on November 12, 2025, which you may have the opportunity to be heard and show cause why the 
order should not remain in effect. The following actions are required to be completed for this EO to be 
withdrawn. 
 
1. All work within the regulated wetland area or the upland review area (URA), which is 100 feet from a 
wetland or 200 feet from a watercourse, shall cease except for the following: 
a. Maintain and enhance the erosion control barrier so that no sediment may leave the disturbed 
area.  
i. Erosion controls shall be inspected by a qualified and approved designee within 24-hours of a 
rain event of .5” or more of rainfall in a 24-hour period. Within 48-hours of the inspection, a 
report including the inspection findings and photos must be submitted to the Office of 
Community Development or emailed to wetlandsagent@granby-ct.gov.  
b. Exposed soil shall be stabilized and seeded with a quick germinating seed mixture, mulch and 
other soil stabilizing methods shall be implemented to prevent the migration of soil/sediment into 
the resource areas. Stabilization shall be considered successful when 70% of the area is 
established with 90% permanent vegetative cover. 
c. The wetland boundary on the entire properties shall be delineated by a Soil Scientist to determine 
the impact areas and effective mitigation measures. The delineation shall be documented for 
evaluation of impacts to the wetland resource areas and their associated URAs.  
d. The following materials shall be submitted by December 3, 2025, for review at the IWWC regular 
meeting on December 10, 2025. 
i. A site plan shall be submitted that defines the following: boundaries of wetlands and 
watercourses; aerial estimation of disturbed wetland and watercourse boundaries; calculation 
of disturbed areas to wetlands, watercourses, bank, and URA; the location of existing roads 
and trails; the limit of clearing; property boundaries and any required zoning setbacks 
associated with completed activities.  
ii. A timeline for the professionals doing the work shall be provided, along with the name(s) of 
professional(s) retained. 
iii. A wetland/soil scientist shall submit an accompanying report that defines, quantifies 
quantities, and details adequate mitigation for impacts to the wetland resource areas for 
review and approval by the IWWC. 
a) This evaluation shall include an investigation to determine the extent of sediment 
migration beyond the property boundaries.  
b) It shall also include an estimation of change in cover for the wetland resource areas and 
their URAs as it relates to the protection of the functions and values of the wetland 
resource areas.  
c) In addition, it shall include a narrative about how the activities have changed the 
ecological communities and functions of the wetlands or watercourses involved in and 
adjacent to the disturbed area.  
d) A detailed planting plan shall be provided for all disturbed wetland resources to restore to 
the maximum extent feasible, pre-disturbance cover conditions that maintain the 
functions and values of the existing wetland resource areas, in pre-disturbance 
conditions.  
e) A timeline for mitigation activities shall also be submitted for approval by the IWWC.  
2. All structures and material shall be removed, and the site shall be restored to its pre-existing 
conditions.  
 

Page 10 · open in PDF

2nd EO – 142R & 186 Case Street, Granby CT 
11/5/25 
Page 3 of 3 
The EO process shall address any activities already completed, and an application shall be submitted for 
any activities that are proposed to be completed. These reviews will be conducted separately, but 
concurrently by the IWWC and documents for each process, even if duplicate, shall be submitted separately 
for the record for both EO items and permit requests. Please submit one (1) original and one (1) electronic 
copy of all materials.  
 
You shall reimburse the Town of Granby for all payments made to the Town Wetlands Officer for monitoring 
compliance with the provisions of this Enforcement Order at a rate of $100 per hour. The sum of $3,000.00 
shall be deposited to cover these costs. Should the costs exceed this amount, then you will be billed for the 
difference.  Any funds not used will be remitted once the EO is closed out. As used in this context, the term 
“Town Wetlands Officer” includes any person or firm so designated by the Director of Community 
Development for the purposes of monitoring the activities to assure compliance with the provisions of this 
EO. 
 
Please contact me through the Granby Office of Community Development at 860-844-5318 or at 
wetlandsagent@granby-ct.gov with any questions or comments.  
 
Sincerely, 
 
 
 
 
Kate Bednaz 
Town of Granby IWWC Wetlands Agent 

Page 11 · open in PDF

Page 12 · open in PDF

Page 13 · open in PDF

Outlook
Fw: 65 Cider Mill Heights - Pool Application
From Nicholas Goggin <gogginnicholas@yahoo.com>
Date Mon 1/5/2026 1:05 PM
To Renee Deltenre <RDeltenre@granby-ct.gov>
 
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
 
Sent from Yahoo Mail for iPhone
Begin forwarded message:
On Monday, December 29, 2025, 1:12 PM, Nicholas Goggin <gogginnicholas@yahoo.com> wrote:
1) silt fence and stone road way 2) silt fence 3)they’ll be a fence and concrete patio around the pool landscape will be grass 4)
excess materials will be trucked off site to shop or placed within 10’ of pool
Sent from Yahoo Mail for iPhone
On Thursday, December 4, 2025, 2:23 PM, Granby Wetlands Agent <wetlandsagent@granby-ct.gov> wrote:
Hi Nick, 
Thank you for your application. If you would, kindly add the following information to the application. 
1. How are you going to contain sediment migration from the work area, especially during heavy rain events?
2. Method to stabilize exposed soils?
3. Is there going to be a walkway, landscaping, fence, or any other features as part of this project?
4. Where will excess materials be deposited?
Please feel free to update your aerial plans and provide a brief narrative with any remaining details to Renn and I. 
SINCERELY, 
THE GRANBY INLAND WETLANDS AGENT
From: Renee Deltenre <RDeltenre@granby-ct.gov>
Sent: Wednesday, December 3, 2025 10:42 AM

Page 14 · open in PDF

Page 15 · open in PDF

Page 16 · open in PDF

  

Minutes: archived copy, SHA-256 c29ed7fa3747…. Agenda: archived copy, SHA-256 a7f93e7e4bfa…. Packet: archived copy, SHA-256 7668a1d38cdb….