CT Public Docs Tracker

Towns / Granby / Capital Program Priorities Advisory Committee / Feb 2, 2026

Capital Program Priorities Advisory Committee, Feb 2, 2026

Granby minutes posted

Documents

TypeDocumentPagesOpen
minutes Capital Program Priority Advisory Committee Regular Meeting Minutes 5 PDF download · town site
agenda Capital Program Priority Advisory Committee Regular Meeting 1 PDF download · town site
packet Capital Program Priority Advisory Committee Regular Meeting (packet) 7 PDF download · town site

Summary of the minutes

AI-generated summary. Each line links to the PDF page it came from; check it before relying on it.

Read the official minutes (PDF, 5 pages) The PDF is the record; this summary is a guide to it.

The committee approved minutes of January 26, 2026, and voted 7-0-0 to recommend a FY2026 Capital Funding Package totaling $19,450,000 to the Board of Selectmen and Board of Finance, subject to three conditions. The package covers stadium field and track, baseball/softball synthetic turf, Granby Memorial Middle School repairs and design, and the Granby Public Library renovation.

Decisions (10) · all reported votes

  1. Approval of CPPAC minutes of January 26, 2026
    Motion by M. Neumann, seconded by J. Adams, approved the minutes as presented
    Vote: 7-0-0 · p. 1
  2. FY2026 Capital Funding Package recommendation to Board of Selectmen and Board of Finance $19,450,000
    Motion by D. Peling, seconded by J. Adams, recommended approval of the FY2026 Capital Funding Package totaling $19,450,000 for the projects in the current proposal, subject to three conditions
    Vote: 7-0-0 · p. 2
  3. Condition 1: Fiscal discipline
    Town shall not consider further major large capital projects until the next significant debt service drop-off scheduled for fiscal year 2034
    Vote: 7-0-0 · p. 2
  4. Condition 2: Private contribution for library $1.5 million
    A minimum $1.5 million private funding threshold to be established as a requirement for the library improvements
    Vote: 7-0-0 · p. 2
  5. Condition 3: Oversight by Project Building Committees
    Board of Selectmen to establish one or more Project Building Committees to manage and oversee execution of approved projects
    Vote: 7-0-0 · p. 2, p. 3
  6. Project breakdown: Stadium Field, Track & Field Two (BOE) $6,300,000 $6,930,000
    Included in recommended package at base estimate $6,300,000 and total with 10% contingency $6,930,000
    Vote: 7-0-0 · p. 2, p. 3
  7. Project breakdown: Baseball/Softball Synthetic Turf (BOE) $3,200,000 $3,520,000
    Included in recommended package at base estimate $3,200,000 and total with 10% contingency $3,520,000
    Vote: 7-0-0 · p. 2, p. 3
  8. Project breakdown: GMMS Repairs & Design (BOE) $3,000,000
    Included in recommended package at $3,000,000 with no contingency added
    Vote: 7-0-0 · p. 2, p. 3
  9. Project breakdown: Granby Public Library Renovation (Town) $6,000,000
    Included in recommended package at $6,000,000 with no contingency added
    Vote: 7-0-0 · p. 2, p. 3
  10. Adjournment
    Motion by M. Neumann, seconded by H. Lombardo, adjourned the meeting at 6:28 p.m.
    Vote: 7-0-0 · p. 3

Also discussed (3)

  • Bonding capacity discussion for $19.45M bonding package $19.45M approximately $1.83M $2.46M $998K $514K: Chairman Hobson and Board of Finance Chairman Guarco reviewed financial viability and opined the package is structurally sound based on bonding capacity projections · p. 2
  • Project breakdown totals $18,500,000 $19,450,000: Base estimate total $18,500,000; total with contingency $19,450,000 as stated in document · p. 3
  • Curt Johnson letter regarding four proposed projects (attached to minutes) $6,100,000 $6,700,000 $1,800,000 $2,500,000 $4,000,000: Letter submitted to chairman with suggestions; suggests reducing combined total to near $16,000,000; no committee action recorded · p. 4, p. 5

This PDF is a scan; its text was read by OCR and may contain errors.

Summary of the agenda: Capital Program Priority Advisory Committee Regular Meeting

AI-generated summary.

The Granby Capital Program Priority Advisory Committee's February 2, 2026 agenda lists approval of the January 26, 2026 minutes, a bonding capacity discussion, and capital priority recommendations from the Board of Education and the Town.

On the agenda (4)

  1. Approval of CPPAC Regular Meeting Minutes - January 26, 2026 · p. 1
  2. Bonding Capacity Discussion (Financial Viability Analysis; CPPAC Proposed Motion; The Roadmap Capital Plan 2.1.26) · p. 1
  3. New Business: Board Of Education - Capital Priority Recommendations · p. 1
  4. New Business: Town - Capital Priority Recommendations · p. 1

Full text of the documents

View the minutes PDF on this page (Capital Program Priority Advisory Committee Regular Meeting Minutes) Open the PDF
Text read from the scanned minutes (OCR) (Capital Program Priority Advisory Committee Regular Meeting Minutes, 5 pages)

Page 1 · open in PDF

TOWN OF GRANBY 
CAPITAL PROGRAM PRIORITY ADVISORY COMMITTEE 
MEETING MINUTES 
FEBRUARY 2, 2026 
 
MEMBERS PRESENT: Kevin Hobson,  Chairman; John Adams, Margaret Chapple,  William 
Kennedy, Heather Lombardo, Mark Neumann, and David Peling 
 
EX OFFICIO MEMBERS PRESENT: Cheri Burke, Superintendent of Schools;  Mark Fiorentino, 
First Selectman; Michael Guarco, Chairman, Board of Finance; Monica Logan, Chairman, Board 
of Education, and Mike Walsh, Town Manager 
 
ABSENT: None 
 
Chairman Kevin Hobson called the meeting of the Capital Program Priorit y Advisory Committee 
to order at 5:00 p.m. 
 
1. PLEDGE OF ALLEGIANCE 
 
2. MINUTES 
2.I. Approval of CPPAC Meeting Minutes – January 26, 2026 
 
ON A MOTION by  M. Neumann, seconded by J. Adams , the committee voted (7-0-0) 
to approve the minutes of January 26, 2026, as presented. 
 
3. PUBLIC COMMENT 
The following residents spoke in support of the proposed projects to reconstruct Stadium Field 
and the track and to convert the existing baseball field at the high school to a new all-weather 
turf facility. 
David Peling, 15 Hampton Village Drive, Granby 
Chris Saunders, 6 Heather Lane, North Granby 
Mark Migliaccio, 6 Black Oak Drive, West Granby 
Steven Simard, 29 Whitman Drive, Granby 
Brynne Simard, 29 Whitman Drive, Granby 
Chris Perry, 7 Brianwood Lane, Granby 
Joseph Lewie, 6 Candlewood Lane, Granby 
Greg Dion, 62 Silver Brook Lane, North Granby 
Gavin Baron, 5 Long Lott Road, West Granby 
Abby Heller, 11 Winter Village Road, Granby 
Mike Dombrowski, 7 Farm View Lane, Granby 
Auggie Mayle, 13 Strong Road, West Granby 
Beth Heller, 11 Winter Village Road, Granby 
 
The following residents spoke in support of the library expansion project. 
Dan Jachyn, 218 Salmon Brook Street, Granby 
Lauren Charamut, 30 Shelley Drive, Granby 
Aubrey Schultz, 17 Kilmer Lane, Granby 
 

Page 2 · open in PDF

CPPAC Minutes 
2/2/26 
Page 2 
  
Curt Johnson, 1 Fielding Woods, West Granby submitted a letter to the chairman with 
thoughts regarding the four projects presented to CPPAC. The letter is attached to the 
minutes. 
Beth Carroll, 10 Quail Lane, North Granby posed a question to the committee regarding the 
funding of the sewer project. 
 
4. COMMUNICATIONS 
4.I. Bonding Capacity Discussion 
CPPAC Chairman Hobson and Board of Finance Chairman Guarco reviewed the 
financial viability of a $19.45M bonding package and opined that  based on current 
bonding capacity projections, the package is structurally sound based on: 
• Flat Debt Service: By utilizing the Capital Needs Expenditure Fund (CNEF), the 
Town can maintain a flat net debt service of approximately $1.83M through 
2032. 
• Strategic Drawdown: The model builds a CNEF surplus through 2029 (peaking 
at $2.46M) to absorb the “New Debt” service that begins to ramp up in 2030. 
• The 2034 “Cliff”: This plan bridges the gap until 2034, when existing debt drops 
from $998K to $514K, creating the necessary capacity to sustain the new bond 
without a tax spike. 
 
Fiscal 
Year 
Existing 
Debt ($) 
New Debt 
($) 
Feed Into 
CNEF ($) 
Use of 
CNEF ($) 
New Debt 
Service ($) 
Ending 
CNEF 
Balance 
($) 
2026 1,731 0 105 0 1,836 930 
2027 1,234 0 602 0 1,836 1,577 
2028 1,198 0 638 0 1,836 2,277 
2029 1,136 417 283 0 1,836 2,642 
2030 1,098 1,290 0 -552 1,836 2,153 
2031 1,065 1,728 0 -957 1,836 1,232 
2032 1,034 1,690 0 -888 1,836 358 
2033 998 1,652 0 -358 2,292 0 
2034 514 1,614 0 0 2,128 0 
 
After a roundtable discussion on the recommended proposal and financing strategy the 
following motion was put forth and approved by the committee. 
ON A MOTION by D. Peling, seconded by J. Adams, the committee voted (7-0-0) to 
recommend to the Board of Selectmen and the Board of Finance the approval of the FY2026 
Capital Funding Package totaling $19,450,000 for the projects specified in the current proposal, 
subject to the following three conditions: 
1. Fiscal Discipline: That the Town shall not consider further major large capital projects 
until the next significant debt service drop-off scheduled for fiscal year 2034. 
2. Private Contribution: That a minimum $1.5 million private funding threshold be 
established as a requirement for the library improvements. 

Page 3 · open in PDF

CPPAC Minutes 
2/2/26 
Page 3 
  
3. Oversight: That the Board of Selectmen establish one or more Project Building 
Committees to manage and oversee the execution of the approved project(s) to ensure 
fiscal accountability. 
Project Breakdown 
Description Sponsor Base Estimate 
 
Total 
(w/ 10% Contingency) 
Stadium Field, Track & Field Two BOE $6,300,000 $6,930,000 
Baseball/Softball Synthetic Turf BOE $3,200,000 $3,520,000 
GMMS Repairs & Design BOE $3,000,000 $3,000,000* 
Granby Public Library Renovation Town $6,000,000 $6,000,000* 
TOTAL  $18,500,000 $19,450,000 
* No contingency added 
5. NEW BUSINESS 
5.I. Board of Education – Capital Priority Recommendations 
No further discussion 
 
5.II. Town – Capital Priority Recommendations 
No further discussion 
 
6. ADJOURNMENT 
ON A MOTION by M. Neumann, seconded by H. Lombardo , the Board voted (7-0-0) to 
adjourn the meeting at 6:28 p.m. 
 
 
Respectfully submitted,  
 
Betsy Mazzotta 
Recording Secretary 

Page 4 · open in PDF

February 2, 2026

Mr. Kevin F. Hobson, Chairman
Capital Program Priorities Advisory Committee
Town of Granby, 15 North Granby Road
Granby, Connecticut 06035

Re: 2027 Proposed Capital Projects - Capital Program Priorities Advisory Committee (CPPAC)

Dear Chairman Hobson and CPPAC members:

The purpose of this letter is to provide my thoughts regarding the four projects that have been presented to CPPAC for status determination for bonding support. I believe there is a strategy that will allow the projects to be reasonably funded with a combined funding value that is within a CPPAC benchmark that will not increase taxes of Granby residents. To follow is a brief summary of my thoughts on each of the projects.

First, regarding the Granby Memorial High School Athletic Fields and Track, declarations have been expressed by representatives of both Granby Public Schools and Granby Board of Education that they have “safety concerns” and the project is “urgent.” After a 2013 completion of significant upgrades to the Athletic Complex/Stadium Field & Track, another major reconstruction in 2026 is required due to a failure of the foundation and subsurface soils; the “urgent” project has been moved to front and center. The estimated cost of $6,100,000.x includes a Post Tension-Concrete foundation for the Stadium Field and Track and resurfacing of Field Two with Athletic Lighting Retrofit to LED. A 10% contingency increases the total to $6,700,000.x; I suggest the Athletic Department consider end-zone safety netting.

Second, there are proposed renovations to Granby Memorial Middle School. Representatives of Granby Public Schools and Granby Board of Education have affirmed that “many core mechanical systems” to be “beyond the end of their expected useful life and require targeted upgrades to ensure continued safe and effective operation. Additionally, a significant percentage of the building does not have any life safety fire suppression sprinkler systems.” I can only place trust in the credibility of their statements serving to elevate near term renovations at the Middle School to a level of urgency to satisfy health and safety concerns. Although the renovations have been initially estimated at $1,800,000.x perhaps it is prudent to increase the estimate to $2,500,000.x to allow for immediate upgrades and “necessary repairs” (Note: the $2.5 million includes a maximum of 10% for Design & Engineering professionals).

Third, based on the Granby Public Library “The Next Chapter” presentation at the CPPAC meeting of January 26, 2026, I reviewed the proposal identified as “Project Option 2 with a Municipal Bond of $4 million.” Although I am not clear of the proposed gross area expansion, I do know that the Granby Assessors Data Base has listed Granby Public Library with a Gross/Living Area of over 10,000 square feet (sf). A one-story addition of 5,000 square feet adds meaningful square footage to the existing footprint increasing the Gross Area by 50% to 15,000 sf. A $4,000,000.x construction estimate equates to a per square foot (psf) construction budget of $800/psf.

(Page 1 of 2)

Page 5 · open in PDF

Factoring in a maximum 8-10% Design & Engineering indirect project cost, the psf direct construction budget remains reasonable at $736/psf (8%) or $720/psf (10%). A 50% expansion of the Gross Area of the current Granby Public Library will greatly serve to build out much needed space to accommodate Adult Programs and Children's Programs, allow for larger meeting rooms, create updated reading and resource areas and enhance other library services. A one-story expansion should reduce direct construction costs and also allow construction funds to be invested into external aesthetic features e.g. landscaping, lighting, a core patio location that is buffered from Rte. 20 noise. Exterior construction can remain compatible with Granby's rural setting. I suggest adding a contingency of 10% or $400,000 increasing the project budget to $4,400,000.x supporting an overall objective to provide renovations that achieve a high level of comfort, and efficiency in a well-designed space for both the public and staff.

Fourth, the "January 5th 2026 "Granby Public Schools: Capital Improvement Plan Discussion" also proposes construction of "Granby High School Baseball/Multipurpose Field" stated with a "goal of the project is to create a durable, multi-use athletic venue that increases field availability, improves safety and playability and significantly reduces weather-related disruptions and long-term maintenance costs." As listed in the November 24, 2025 "Project Proposal-Granby Field Renovations" the total estimated budget is $3,200,000. Absent representations of any "urgency", I do believe there are logical business reasons to consider the project with an estimated budget of $3,500,000.x (includes a 10% contingency; no lights). I base my suggestion on the following 1) the contractor has economies and efficiencies of scale performing renovations on three athletic field projects; 2) more meaningful credits should be offered to the town of Granby and 3) successful and timely completion of three projects is attainable.

The total estimate of all four proposed projects for CPPAC bonding is $17,100,000.x I offer some points regarding the four projects for project representatives to consider:

- The contract(s) for the Athletic Fields and Track is a Design/Build contract; Field Turf controls the design, construction costs and ultimately their gross/net profits. To reduce costs remain mindful to prevent duplication of contingency costs carried by the contractors.
- It is prudent to hire a Construction Manager (CM) solely representing Granby's interests; a professional with in-depth building/site experience and proven management of change orders.
- Performance & Payment Bonds will be required due to public funding of projects and it is important to know all contractual Design/Build Warranty Terms, Conditions and Exclusions.

In closing, I believe there exists an opportunity for the town of Granby to work in partnership with the Design/Build contractors and a Construction Manager to reduce the total costs of all four projects to get closer to $16,000,000. Achieving $16,000,000.x should serve the best interests of Granby taxpayers; a CPPAC benchmark capacity to prevent a tax increase. I thank you for the time to convey my thoughts.

Sincerely,

Curt Johnson

Curt Johnson (West Granby resident)

Cc: All Current and Ex Officio Members of CPPAC, and Betsy Mazzotta, Recording Secretary

(Page 2 of 2)
View the agenda PDF on this page (Capital Program Priority Advisory Committee Regular Meeting) Open the PDF
Text of the agenda (Capital Program Priority Advisory Committee Regular Meeting, 1 page)

Page 1 · open in PDF

Join Zoom Meeting
https://us02web.zoom.us/j/83384365180?
pwd=uQig3tqUb1a4ORMEMxd3UO4K1Qoybz.1
Meeting ID: 833 8436 5180
Passcode: 978494
TOWN OF GRANBY
Capital Program Priority Advisory Committee (CPPAC)
Regular Meeting Agenda
Monday, February 2, 2026 – 5 p.m.
 Town Hall Meeting Room
Pledge Of Allegiance
Minutes
Approval Of CPPAC Regular Meeting Minutes - January 26, 2026
CPPAC MINUTES 012626.PDF
Public Comment
Communications
Bonding Capacity Discussion
FINANCIAL VIABILITY ANALYSIS KH.PDF
CPPAC PROPOSED MOTION KH.PDF
THE _ROADMAP_ CAPITAL PLAN 2.1.26 KH.PDF
New Business
Board Of Education - Capital Priority Recommendations
Town - Capital Priority Recommendations
Adjournment
The next regular meeting of the Town of Granby CPPAC is scheduled for Monday, 
February 23, 2026, at 5 p.m. in the Town Hall Meeting Room.
1.
2.
2.I.
Documents:
3.
4.
4.I.
Documents:
5.
5.I.
5.II.
6.
View the packet PDF on this page (Capital Program Priority Advisory Committee Regular Meeting (packet)) Open the PDF
Text of the packet (Capital Program Priority Advisory Committee Regular Meeting (packet), 7 pages)

Page 1 · open in PDF

Join Zoom Meeting
https://us02web.zoom.us/j/83384365180?
pwd=uQig3tqUb1a4ORMEMxd3UO4K1Qoybz.1
Meeting ID: 833 8436 5180
Passcode: 978494
TOWN OF GRANBY
Capital Program Priority Advisory Committee (CPPAC)
Regular Meeting Agenda
Monday, February 2, 2026 – 5 p.m.
 Town Hall Meeting Room
Pledge Of Allegiance
Minutes
Approval Of CPPAC Regular Meeting Minutes - January 26, 2026
CPPAC MINUTES 012626.PDF
Public Comment
Communications
Bonding Capacity Discussion
FINANCIAL VIABILITY ANALYSIS KH.PDF
CPPAC PROPOSED MOTION KH.PDF
THE _ROADMAP_ CAPITAL PLAN 2.1.26 KH.PDF
New Business
Board Of Education - Capital Priority Recommendations
Town - Capital Priority Recommendations
Adjournment
The next regular meeting of the Town of Granby CPPAC is scheduled for Monday, 
February 23, 2026, at 5 p.m. in the Town Hall Meeting Room.
1.
2.
2.I.
Documents:
3.
4.
4.I.
Documents:
5.
5.I.
5.II.
6.

Page 2 · open in PDF

TOWN OF GRANBY 
CAPITAL PROGRAM PRIORITY ADVISORY COMMITTEE 
MEETING MINUTES 
JANUARY 26, 2026 
M
EMBERS PRESENT: Kevin Hobson,  Chairman; John Adams, Margaret Chapple, William 
Kennedy, Heather Lombardo, Mark Neumann, and David Peling 
EX 
OFFICIO MEMBERS PRESENT: Cheri Burke, Superintendent of Schools;  Mark Fiorentino, 
First Selectman; Michael Guarco, Chairman, Board of Finance; Monica Logan, Chairman, Board 
of Education, and Mike Walsh, Town Manager 
A
BSENT: None 
C
hairman Kevin Hobson called the meeting of the Capital Program Priorit y Advisory Committee 
to order at 5:00 p.m. 
1. P
LEDGE OF ALLEGIANCE
2. M
INUTES
2.I. Approval of CPPAC Meeting Minutes – January 5, 2026
ON
 A MOTION by J. Adams, seconded by D. Peling, the Board voted (7-0-0) to approve 
the minutes of January 5, 2026, as presented. 
3. P
UBLIC COMMENT
The following residents spoke in support of the proposed projects to reconstruct Stadium Field
and the track and to convert the existing baseball field at the high school to a new all-weather
turf facility.
David Peling, 15 Hampton Village Drive, Granby
Joseph Lewie, 6 Candlewood Lane, Granby
Mike Dombrowski, 7 Farmview Lane, North Granby
C
urt Johnson, 1 Fielding Woods, West Granby submitted a letter to the chairman with four
questions pertaining to the funding of the capital projects and the CPPAC process. The letter
is attached to the minutes.
4. CO
MMUNICATIONS
None.
5. NE
W BUSINESS
5.I. Board of Education – Capital Priority Recommendations
5.I.1. Stadium Field and High School Track
Superintendent Cheri Burke introduced Chris Hulk, Vice President for New England 
from FieldTurf to present further information and details on the turf projects proposed 
for GMHS. The presentation included the condition of the existing site, the proposed 
post tension concrete design solution and the proposed plan. 

Page 3 · open in PDF

CPPAC Minutes 
1/26/26 
Page 2 
5.I.2. Baseball and Softball Fields
The presentation also included an overview of the proposal to convert the existing 
baseball field at the high school to a new all-weather turf facility. 
The f
ull presentation from FieldTurf is included as part of the CPPAC agenda packet 
on the Town website. 
5.
I.3. Middle School
A visual assessment of the current condition of the middle school was completed 
which identified several areas such as common areas and classroom spaces that 
are outdated, in poor condition and no longer serve the needs of the students and 
staff in a modern learning environment. However, the information from the visual 
assessment is not sufficient to form a project proposal at this time. The BOE is 
requesting CPPAC postpone a decision on this project until more information is 
gained through a Full Facilities Condition Assessment (February ), and an HVAC 
inspection (April) . Additional work has also been done on a ten-year certified 
enrollment projection and education specifications to meet the state requirements for 
reimbursement. 
5
.II. Town – Capital Priority Recommendations
5.II.1. Library Fundraising and Grants
Amber Wyzik, Director of Library Services and Lauren Charamut, Chair of the 
Campaign Cabinet provided an overview of the fundraising efforts for the library 
expansion project. The campaign seeks to raise $2 million in private support – an 
amount confirmed as achievable through a feasibility study to help fund the 
expansion and renovation of the Granby Public Library to better serve the 
community. Donations will support furnishings and shelving, quiet study rooms and 
other welcoming features. In addition, the Library Director is actively pursuing $2- 3 
million in grants which, along with the municipal bond, are expected to cover a 
significant portion of the cost of the project. A number of grant opportunities are in 
the pipeline and will be finalized over the next several months. 
The 
full library fundraising presentation is included as part of the CPPAC agenda 
packet on the Town website. 
6. BO
NDNG CAPACITY DISCUSSION
This agenda item was postponed until the next CPPAC meeting in the interest of time.
7. A
DJOURNMENT
ON A MOTION by J. Adams, seconded by M. Neumann, the Board voted ( 7-0-0) to adjourn
the meeting at 7:16 p.m.
The 
next meeting of the Capital Program Priority Advisory Committee will be held on Monday, 
February 2, 2026, at 5:00 p.m. in the Town Hall Meeting Room. 
R
espectfully submitted, 
B
etsy Mazzotta 
Recording Secretary 

Page 4 · open in PDF

Page 5 · open in PDF

 Financial  Viability  Analysis  -  CPPAC  2.2.26 
 Based  on  current  bonding  capacity  projections,  this  $19.45M  package  is  structurally  sound: 
 ●  Flat  Debt  Service:  By  utilizing  the  Capital  Needs  Expenditure  Fund  (CNEF)  ,  the  town  can 
 maintain  a  flat  net  debt  service  of  approximately  $1.83M  through  2032. 
 ●  Strategic  Drawdown:  The  model  builds  a  CNEF  surplus  through  2029  (peaking  at  $2.64M  )  to 
 absorb  the  "New  Debt"  service  that  begins  to  ramp  up  in  2030. 
 ●  The  2034  "Cliff":  This  plan  bridges  the  gap  until  2034,  when  existing  debt  drops  from  $998k  to 
 $514k  ,  creating  the  necessary  capacity  to  sustain  the  new  bond  without  a  tax  spike. 
 Fiscal  Year 
 Existing 
 Debt  ($) 
 New  Debt 
 ($) 
 Feed  Into 
 CNEF  ($) 
 Use  of 
 CNEF  ($) 
 Net  Debt 
 Service  ($) 
 Ending 
 CNEF 
 Balance  ($) 
 2026  1,731  0  105  0  1,836  930 
 2027  1,234  0  602  0  1,836  1,577 
 2028  1,198  0  638  0  1,836  2,277 
 2029  1,136  417  283  0  1,836  2,642 
 2030  1,098  1,290  0  -552  1,836  2,153 
 2031  1,065  1,728  0  -957  1,836  1,232 
 2032  1,034  1,690  0  -888  1,836  358 
 2033  998  1,652  0  -358  2,292  0 
 2034  514  1,614  0  0  2,128  0 

Page 6 · open in PDF

 Recommended  Proposal  based  on  Strategy  for  the  $19.45M  Capital  Bond  Recommendation 
 dated  2.2.2026. 
 "I  move  that  the  CPPAC  recommend  to  the  Board  of  Selectmen  and  the  Board  of  Finance  the  approval  of 
 the  FY2026  Capital  Funding  Package  totaling  $19,450,000  for  the  projects  specified  in  the  current 
 proposal,  subject  to  the  following  three  conditions: 
 1.  Fiscal  Discipline:  That  the  Town  shall  not  consider  further  major  large-capital  projects  until  the 
 next  significant  debt  service  drop-off  scheduled  for  Fiscal  Year  2034  . 
 2.  Private  Contribution:  That  a  minimum  $1.5  million  private  funding  threshold  be  established 
 as  a  requirement  for  the  library  improvements. 
 3.  Oversight:  That  the  Board  of  Selectmen  establish  one  or  more  Project  Building  Committees  to 
 manage  and  oversee  the  execution  of  the  approved  project(s)  to  ensure  fiscal  accountability." 
 Project  Breakdown  for  the  Record 
 Project  Description  Sponsor  Base  Estimate  Total  (w/  10%  Contingency) 
 Stadium  Field,  Track  &  Field  Two  BOE  $6,300,000  $6,930,000 
 Baseball/Softball  Synthetic-Turf  BOE  $3,200,000  $3,520,000 
 GMMS  Repairs  &  Design  BOE  $3,000,000  $3,000,000* 
 Granby  Public  Library  Renovation  Town  $6,000,000  $6,000,000* 
 TOTAL  $18,500,000  $19,450,00 
 *No  contingency  added. 

Page 7 · open in PDF

 To:  CPPAC  Members 
 From:  Kevin  Hobson,  CPPAC  Chairman 
 Date:  2.2.2026 
 Subject:  Strategy  for  the  $19.45M  Capital  Bond  Recommendation 
 The  Core  Idea:  We  propose  a  single  $19.45M  bonding  assumption  for  consideration  to  the 
 Board  of  Selectman  &  Board  of  Finance  and  ultimately  to  the  residents  for  referendum. 
 Project  Description  Sponsor  Base  Estimate  Total  (w/  10%  Contingency) 
 Stadium  Field,  Track  &  Field  Two  BOE  $6,300,000  $6,930,000 
 Baseball/Softball  Synthetic-Turf  BOE  $3,200,000  $3,520,000 
 GMMS  Repairs  &  Design  BOE  $3,000,000  $3,000,000* 
 Granby  Public  Library  Renovation  Town  $6,000,000  $6,000,000* 
 TOTAL  $18,500,000  $19,450,00 
 Conditions  to  proceed: 
 To  make  this  $19.45M  work  for  the  taxpayers,  we  should  consider  guardrails: 
 ●  If  we  bond  the  $19.45M  now,  the  Boards  and  committee  agrees  to  no  new  major  capital 
 asks  until  the  debt  service  "cliff"  in  2034. 
 ●  The  Library  obtains  a  $1.5M  Private  Funding  Goal.  We’re  setting  a  requirement  for 
 $1.5M  in  private  donations  for  the  library.  This  keeps  the  actual  debt  lower  for  a  larger 
 project  and  ensures  the  Library  board  is  held  to  the  fundraising  commitments. 
 ●  Building  Committee(s)  for  oversight:  Recommend  the  BOS  set  up  a  dedicated  Building 
 Committee(s)  for  these  project(s).  We  want  residents  with  construction  and  finance 
 expertise  looking  over  the  project  and  contractor(s)  to  ensure  scope  and  we  stay  on 
 budget. 

Minutes: archived copy, SHA-256 ab7bb90321b1…. Agenda: archived copy, SHA-256 71dc09e94e9a…. Packet: archived copy, SHA-256 5c1dbbe5ae64….