Towns / Granby / Capital Program Priorities Advisory Committee / Jan 5, 2026
Capital Program Priorities Advisory Committee, Jan 5, 2026
Granby Capital Program Priorities Advisory Committee Hide agendas that already have minutesDocuments
| Type | Document | Pages | Open |
|---|---|---|---|
| minutesminutes | Capital Program Priority Advisory Committee Regular Meeting Minutes | 4 | PDF download · town site |
| agenda | Capital Program Priority Advisory Committee Regular Meeting | 2 | PDF download · town site |
| packetpacket | Capital Program Priority Advisory Committee Regular Meeting (packet) Not attached: this packet is 37 MB, too large to host here. Use the town site link. |
62 | town site |
Summary of the minutes
AI-generated summary. Each line links to the PDF page it came from; check it before relying on it.
Read the official minutes (PDF, 4 pages) The PDF is the record; this summary is a guide to it.
The committee approved its November 24, 2025 minutes and voted to forward the Town's Sewer Pump Project ($1.5 million) and the Salmon Brook Park Pickleball Courts and Bathroom Facility ($500,000) to the Board of Selectmen for consideration. The Board of Education's capital recommendations, including a high school track and field project and middle school and baseball field requests, were discussed and will continue at the next meeting.
Decisions (5) · all reported votes
- Approval of CPPAC minutes of November 24, 2025
Motion by M. Neumann, seconded by H. Lombardo, to approve the minutes as presented; W. Kennedy abstained.
Vote: 6-0-1 · p. 1 - Motion to reorder agenda to move Town Capital Priority Recommendations before Board of Education Capital Priority Recommendations
Motion by J. Adams, seconded by M. Neumann, to reorder the agenda as stated.
Vote: 7-0-0 · p. 2 - Town Sewer Pumps maintenance project $1.5 million $902K
Committee voted to forward the Town Sewer Pump Project at $1.5 million to the Board of Selectmen for consideration, as defined in the December 4, 2025 document from the Town Manager. Project to be financed by a 20-year bond with debt service paid from the Sewer Utility Fund (balance $902K).
Vote: 7-0-0 · p. 2, p. 3 - Pickleball Courts and Salmon Brook Park public bathroom facility $500,000 $250,000 $432K
Committee voted to forward the Pickleball Courts and Bathroom Facility at Salmon Brook Park project at $500,000 to the Board of Selectmen for consideration, as defined in the December 4, 2025 document from the Town Manager. Recommended 20-year bond supported by the Parks and Recreation Fund (balance $432K).
Vote: 7-0-0 · p. 3 - Adjournment and next meeting
Motion by J. Adams, seconded by M. Neumann, to adjourn at 6:51 p.m.; next meeting set for January 26, 2026 at 5:00 p.m.
Vote: 7-0-0 · p. 4
Also discussed (4)
- Memo on Bonding Timeline and Narrative (Illustrative Outline): Committee received the December 31, 2025 memo on bonding timelines and narrative; no decision recorded. · p. 2
- Board of Education High School Track and Stadium Field replacement $6.1 million $125,000: Board of Education recommended a $6.1 million project to reconstruct Stadium Field and the track surface; discussion only, no committee decision recorded. · p. 3
- Board of Education Middle School project $1.75 million: Board of Education scaled back the project and requested $1.75 million for a comprehensive facilities assessment and immediate repairs; discussion only, no committee decision recorded. · p. 4
- Board of Education high school baseball field conversion to synthetic turf $3.4 million $750,000: Board of Education recommended a project of approximately $3.4 million plus 8%-10% contingency and $750,000 for LED light fixtures; discussion only, no committee decision recorded. · p. 4
Summary of the agenda: Capital Program Priority Advisory Committee Regular Meeting
AI-generated summary.
This is the agenda for the Granby CPPAC regular meeting on January 5, 2026, which covers approval of the November 24, 2025 minutes, a large set of capital improvement plan communications, and capital priority recommendations for the Board of Education and the Town. The agenda lists items for action but no votes or dollar amounts have been recorded yet.
On the agenda (12)
- Approval of CPPAC Regular Meeting Minutes - November 24, 2025 · p. 1
- Communication: December 31, 2025 Memo - Transmittal of Updated and New Capital Project Information · p. 1
- Communication: Board of Selectmen December 10, 2025 Memo on CIP Amendments · p. 1
- Communication: Amended 10-Year Capital Improvement Plan · p. 1
- Communication: "Short List" of Town Capital Items With Requested Bonding Highlighted · p. 1
- Communication: Board of Selectmen, Board of Finance, Board of Education, and CPPAC December 31, 2025 Memo on Bonding Timeline and Narrative - Illustrative Outline · p. 1, p. 2
- Communication: 12 Pages of Individual and Combined Debt Service Modeling · p. 2
- Communication: Two Page Crosswalk Detailing Stabilized Debt Service (In Lieu of Volatile Debt Service) · p. 2
- Communication: Six-Page CIP Policy Discussion Focusing on Town Bond Requests · p. 2
- Communication: Pictures and Backup Materials (Pages 1-11) for Town Requested Bonding Items · p. 2
- New Business: Board of Education Capital Priority Recommendations, including High School Track and Middle School · p. 2
- New Business: Town Capital Priority Recommendations, including Sewer Pumps and Pickleball Courts/SBP Public Bathroom Facility · p. 2
This PDF is a scan; its text was read by OCR and may contain errors.
Full text of the documents
View the minutes PDF on this page (Capital Program Priority Advisory Committee Regular Meeting Minutes)
Text of the minutes (Capital Program Priority Advisory Committee Regular Meeting Minutes, 4 pages)
Page 1 · open in PDF
TOWN OF GRANBY CAPITAL PROGRAM PRIORITY ADVISORY COMMITTEE MEETING MINUTES JANUARY 5, 2026 MEMBERS PRESENT: Kevin Hobson, Chairman; John Adams, Margaret Chapple, William Kennedy, Heather Lombardo, Mark Neumann, and David Peling EX OFFICIO MEMBERS PRESENT: Cheri Burke, Superintendent of Schools; Mark Fiorentino, First Selectman; Michael Guarco, Chairman, Board of Finance; Monica Logan, Chairman, Board of Education, and Mike Walsh, Town Manager ABSENT: None Chairman Kevin Hobson called the meeting of the Capital Program Priorit y Advisory Committee to order at 5:02 p.m. 1. PLEDGE OF ALLEGIANCE 2. MINUTES 2.I. Approval of CPPAC Meeting Minutes – November 24, 2025 ON A MOTION by M. Neumann, seconded by H. Lombardo, the Board voted (6-0-1) to approve the minutes of November 24, 2025, as presented. W. Kennedy abstained. 3. PUBLIC COMMENT The following residents spoke in favor of the proposed project to reconstruct the existing baseball field at the high school to a new all-weather turf facility. Chris Perry, 7 Brianwood Lane, Granby Greg Dion, 62 Silver Brook Lane, North Granby Mike Dombrowski, 7 Farmview Lane, North Granby 4. COMMUNICATIONS Town Manager Mike Walsh reviewed several documents related to the Town’s capital project requests and addressed questions from the committee. 4.I. December 31, 2025, Memo – Transmittal of Updated & New Capital Project Information 4.I.1. Board of Selectmen December 10, 2025, Memo on CIP Amendments The memo outlines the refinements made to the line items for the Pump Station Maintenance project ($1.5 million) and the Salmon Brook Park Pickleball Courts and Bathroom ($500,000) on the Capital Improvement Plan approved by the Board of Selectmen in December. 4.I.2. Amended 10-Year Capital Improvement Plan The updated plan includ es the changes to the Pump Station Maintenance project and the Salmon Brook Park Pickleball Courts and Bathroom approved by the Board of Selectmen. 4.I.3. “Short List” of Town Capital Items with Requested Bonding Highlighted The single page report highlights the three major project proposals by the T own including the pump station maintenance at $1.5 million, the library renovation at $7 million and the pickleball courts and bathroom at Salmon Brook Park for $500,000.
Page 2 · open in PDF
CPPAC Minutes 1/5/26 Page 2 4.I.4. Board of Selectmen, Board of Finance, Board of Education, and CPPAC December 31, 2025, Memo on Bonding Timeline and Narrative – Illustrative Outline The memo provides an illustrative outline of possible bonding timelines and the supporting narrative explaining the process . E mphasizing that significant pre - planning is needed to execute the construction of a project, the underwriting and sale of the bonds and to budget debt service. 4.I.5. 12 Pages of Individual and Combined Debt Service Modeling A variety of bond amortizations for each proposed project and also in total were provided for review by the committee. 4.I.6. A Two-Page “Crosswalk” Detailing Stabilized Debt Service (in lieu of volatile Debt Service) The Crosswalk re-amortizes the models to reflect how the Tow n issues bonds showing interest only payments for the first two years and a reduction of principal and interest for the last 18 years. The document illustrates that the Town can maintain level debt service through the middle of 2037 with a $13.5 million bond issuance. This also assumes the Town receives $1 million of bond premium to the debt service fund. 4.I.7. A Six-Page CIP Policy Discussion Focusing on Town Bond Requests The document includes the background, description and estimates of the Pump Station Maintenance Project and the Pickleball Courts and Bathroom Project at Salmon Brook Park. The projects must be approved by the voters to become a lawful appropriation before further work can be done to scope the project and go out to bid. 4.I.8. Pictures and Backup Materials (pages 1-11) for Town Requested Bonding Items ON A MOTION by J. Adams, seconded by M. Neumann, the Board voted ( 7-0-0) to reorder the agenda to move Town - Capital Priority Recommendations before Board of Education - Capital Priority Recommendations under New Business. 5. NEW BUSINESS 5.I. Town – Capital Priority Recommendations 5.I.1. Sewer Pumps The Town operates three sewer pumps (Salmon Brook Park, Route 10, and Route 189) that are approaching 50 years old. The pumps are functional, however in the last 12 months there have been two failures caused by the backup of nip bottles and grease from restaurants. The Town secured three estimates for the maintenance which includes updated mechanicals and electricals, replacement parts and additional monitoring equipment which is needed to improve reliability and sustainability to extend the life of the existing pumps by an estimated 50 years or more. The estimated cost of the project including bond issuance costs is $1.5 million. The Town is recommending a 20- year bond issuance with debt service paid out of the Sewer Utility Fund. The special revenue fund has a balance of $902K from sewer assessment fees paid by sewer users and is intended to pay for the needed maintenance work on the system or to support the debt service should bonds be issued. Given the size of the Sewer Utility Fund balance, debt service payments for the maintenance of the sewer pumps should not have any material impact on the future rates for sewer users.
Page 3 · open in PDF
CPPAC Minutes 1/5/26 Page 3 5.I.2. Pickleball Courts/ SBP Public Bathroom Facility The Town provides pickleball courts for use by residents on the existing tennis courts at Salmon Brook Park. Due to several noise complaints from the neighboring condominiums, noise abatement was considered. In the short term, noise reducing barriers have been purchased and will be installed at the tennis courts in the spring of 2026, however the permanent solution is to relocate the pickleball courts to an area in the park away from residential housing. The addition of standalone pickleball courts at Salmon Brook Park is strongly supported by residents, recommended by the Parks and Recreation Board, and was also identified as part of the GZA Parks Master Plan. The estimated cost of the project to constr uct four pickleball courts is $250,000. The Town is recommending a 20- year bond issuance with debt service paid out of the Parks and Recreation Fund. The special revenue fund has a balance of $432K which is primarily funded by users of the parks system through program and rental fees and would pay for the courts or support the debt service if bonds are issued. Secondly, the addition of a year-round restroom at the northern end of Salmon Brook Park is also strongly supported by the residents, recommended by the Parks & Recreation Board, and was also identified as part of the GZA Parks Master Plan. The estimated cost of the facility would be $250,000 and the Town is recommending a 20-year bond issuance which would also be supported by the Parks & Recreation Fund. The committee discussed the recommendations put forward by the Town, clarifying that these two projects will be paid for through the Sewer Utility Fund and the Parks and Recreation Fund and will not impact the General Fund. ON A MOTION by M. Neumann, seconded by W. Kennedy, the Board voted ( 7-0-0) to forward the Town Sewer Pump Project at $1.5 million and the Pickleball Courts and Bathroom Facility at Salmon Brook Park project at $500,000 as defined in the December 4, 2025, document from the Town Manager to the Board of Selectmen for consideration. 5.II. Board of Education – Capital Priority Recommendations Chairman Monica Logan presented the capital project recommendations for the Board of Education emphasizing that the focus and direction of the BOE has changed based on information received during the CPPAC process. 5.II.1. High School Track This project proposes the replacement of Stadium Field and Field Two at Granby Memorial High School to address structural failures, age, and safety concerns. The existing turf track and field system was origi nally installed in 2013 and has been carefully maintain ed. However, the significant subsurface failures cannot be resolved through surface repairs. These conditions have led to restrictions on use and pose ongoing risks to student-athletes, staff, and community members. Field Two does not have the same issues as Stadium Field, however it is the same age and resurfacing at this time is recommended. Completing both fields at the same time allows for a cost savings of $125,000. The Board of Education is recommending a $6.1 million project to reconstruct Stadium Field and the track surface using a post -tension concrete system to
Page 4 · open in PDF
CPPAC Minutes 1/5/26 Page 4 provide long- term structural stability. Additionally, the p roject would include the installation of new synthetic turf and track surfacing, improve drainage, fencing and associated site work as well as the installation of new, energy efficient LED light fixtures at Stadium Field and Field Two. 5.II.2. Middle School As presented in prior CPPAC meetings, the Middle School was constructed in 1992 and most of the building’s major systems are now over 30 years old. A Visual Facilities Condition Assessment conducted in May 2025 found that while the building remains functional, many of the mechanical systems have exceeded their useful life and require upgrades to ensure continued safe and effective operation. However, acknowledging that these renovations will need to be completed in the future, the Board of Education does not feel they currently have enough information to evaluate the project in order to properly maximize potential reimbursements through the state, minimize disruptions to students and staff and to avoid building code issues. Therefore, at this time the BOE has scaled back the project and is requesting $1.75 million for a comprehensive facilities assessment and to address immediate repairs. The Board of Education is also recommending a project for approximately $3.4 million (plus an 8%-10% contingency and $750,000 for LED light fixtures ) to reconstruct the baseball field at the high school into a new, all -weather synthetic turf facility. The field is in very poor condition due to over use and the lack of irrigation, and the natural grass has become difficult for staff to main tain. The surrounding area including dugouts, bleachers, fencing and walkways also need to be improved or replaced. These additional elements may be added to the project depending on the final scope and funding. The goal of the project is to create a durable, multi-use athletic venue that increases field availability, improves safety and play ability, and reduces weather related disruptions and long- term maintenance costs. Discussion of the Board of Education capital priority recommendations will continue at the next meeting of the Capital Program Priority Advisory Committee. Reports, photos, plans and backup materials for the projects dis cussed can be found as part of the CPPAC agenda packet on the Town website. 6. ADJOURNMENT ON A MOTION by J. Adams, seconded by M. Neumann, the Board voted ( 7-0-0) to adjourn the meeting at 6:51 p.m. The next meeting of the Capital Program Priority Advisory Committee will be held on Monday, January 26, 2026, at 5:00 p.m. in the Town Hall Meeting Room. Respectfully submitted, Betsy Mazzotta Recording Secretary
View the agenda PDF on this page (Capital Program Priority Advisory Committee Regular Meeting)
Text read from the scanned agenda (OCR) (Capital Program Priority Advisory Committee Regular Meeting, 2 pages)
Page 1 · open in PDF
Join Zoom Meeting https://us02web.zoom.us/j/84441380878?pwd=bz9HtpL2kh8ljxRRW7ycEem3nrj2qd.1 Meeting ID: 844 4138 0878 Passcode: 097429 TOWN OF GRANBY Capital Program Priority Advisory Committee (CPPAC) Regular Meeting Agenda Monday, January 5, 2026 – 5 p.m. Town Hall Meeting Room 1. Pledge Of Allegiance 2. Approval Of CPPAC Regular Meeting Minutes - November 24, 2025 Documents: CPPAC MINUTES 112425.PDF 3. Public Comment 4. Communications 4.I. December 31, 2025 Memo - Transmittal Of Updated And New Capital Project Information Documents: TRANSMITTAL OF UPDATED AND NEW CAPITAL PROJECT INFORMATION.PDF 4.I.i. Board Of Selectmen December 10, 2025 Memo On CIP Amendments Documents: CIP AMENDMENTS.PDF 4.I.ii. Amended 10-Year Capital Improvement Plan Documents: AMENDED 10-YEAR CAPITAL IMPROVEMENT PLAN.PDF 4.I.iii. "Short List" Of Town Capital Items With Requested Bonding Highlighted Documents: CPPAC SHORT LIST.PDF 4.I.iv. Board Of Selectmen, Board Of Finance, Board Of Education, And CPPAC
Page 2 · open in PDF
December 31, 2025 Memo On Bonding Timeline And Narrative - Illustrative Outline Documents: BONDING TIMELINE AND NARRATIVE.PDF 4.I.v. 12 Pages Of Individual And Combined Debt Service Modeling Documents: DEBT SERVICE MODELING.PDF 4.I.vi. Two Page "Crosswalk" Detailing Stabilized Debt Service (In Lieu Of Volatile Debt Service) Documents: CROSSWALK - STABILIZED DEBT SERVICE.PDF 4.I.vii. Six-Page CIP Policy Discussion Focusing On Town Bond Requests Documents: CIP POLICY DISCUSSION_ TOWN REQUESTS.PDF 4.I.viii. Pictures And Backup Materials (Pages 1-11) For Town Requested Bonding Items Documents: PICTURES AND BACKUP_ TOWN REQUESTS.PDF 5. New Business 5.I. Board Of Education - Capital Priority Recommendations Documents: GRANBY PUBLIC SCHOOLS- CPPAC DISCUSSION .PDF 5.I.i. High School Track 5.I.ii. Middle School 5.II. Town - Capital Priority Recommendations 5.II.i. Sewer Pumps 5.II.ii. Pickleball Courts/SBP Public Bathroom Facility 6. Adjournment The next regular meeting of the Town of Granby CPPAC is scheduled for Monday, January 26, 2026 at 5 p.m. in the Town Hall Meeting Room.
Text of the packet (Capital Program Priority Advisory Committee Regular Meeting (packet), 62 pages)
Page 1
Join Zoom Meeting https://us02web.zoom.us/j/84441380878?pwd=bz9HtpL2kh8IjxRRW7ycEem3nrj2qd.1 Meeting ID: 844 4138 0878 Passcode: 097429 TOWN OF GRANBY Capital Program Priority Advisory Committee (CPPAC) Regular Meeting Agenda Monday, January 5, 2026 – 5 p.m. Town Hall Meeting Room Pledge Of Allegiance Approval Of CPPAC Regular Meeting Minutes - November 24, 2025 CPPAC MINUTES 112425.PDF Public Comment Communications December 31, 2025 Memo - Transmittal Of Updated And New Capital Project Information TRANSMITTAL OF UPDATED AND NEW CAPITAL PROJECT INFORMATION.PDF Board Of Selectmen December 10, 2025 Memo On CIP Amendments CIP AMENDMENTS.PDF Amended 10-Year Capital Improvement Plan AMENDED 10-YEAR CAPITAL IMPROVEMENT PLAN.PDF "Short List' Of Town Capital Items With Requested Bonding Highlighted CPPAC SHORT LIST.PDF Board Of Selectmen, Board Of Finance, Board Of Education, And CPPAC December 31, 2025 Memo On Bonding Timeline And Narrative - Illustrative Outline BONDING TIMELINE AND NARRATIVE.PDF 12 Pages Of Individual And Combined Debt Service Modeling DEBT SERVICE MODELING.PDF Two Page "Crosswalk" Detailing Stabilized Debt Service (In Lieu Of Volatile Debt Service) CROSSWALK - STABILIZED DEBT SERVICE.PDF Six-Page CIP Policy Discussion Focusing On Town Bond Requests CIP POLICY DISCUSSION_ TOWN REQUESTS.PDF Pictures And Backup Materials (Pages 1-11) For Town Requested Bonding Items PICTURES AND BACKUP_ TOWN REQUESTS.PDF New Business Board Of Education - Capital Priority Recommendations GRANBY PUBLIC SCHOOLS- CPPAC DISCUSSION .PDF High School Track Middle School Town - Capital Priority Recommendations Sewer Pumps Pickleball Courts/SBP Public Bathroom Facility Adjournment The next regular meeting of the Town of Granby CPPAC is scheduled for Monday, January 26, 2026 at 5 p.m. in the Town Hall Meeting Room. 1. 2. Documents: 3. 4. 4.I. Documents: 4.I.i. Documents: 4.I.ii. Documents: 4.I.iii. Documents: 4.I.iv. Documents: 4.I.v. Documents: 4.I.vi. Documents: 4.I.vii. Documents: 4.I.viii. Documents: 5. 5.I. Documents: 5.I.i. 5.I.ii. 5.II. 5.II.i. 5.II.ii. 6.
Page 2
Join Zoom Meeting https://us02web.zoom.us/j/84441380878?pwd=bz9HtpL2kh8IjxRRW7ycEem3nrj2qd.1 Meeting ID: 844 4138 0878 Passcode: 097429 TOWN OF GRANBY Capital Program Priority Advisory Committee (CPPAC) Regular Meeting Agenda Monday, January 5, 2026 – 5 p.m. Town Hall Meeting Room Pledge Of Allegiance Approval Of CPPAC Regular Meeting Minutes - November 24, 2025 CPPAC MINUTES 112425.PDF Public Comment Communications December 31, 2025 Memo - Transmittal Of Updated And New Capital Project Information TRANSMITTAL OF UPDATED AND NEW CAPITAL PROJECT INFORMATION.PDF Board Of Selectmen December 10, 2025 Memo On CIP Amendments CIP AMENDMENTS.PDF Amended 10-Year Capital Improvement Plan AMENDED 10-YEAR CAPITAL IMPROVEMENT PLAN.PDF "Short List' Of Town Capital Items With Requested Bonding Highlighted CPPAC SHORT LIST.PDF Board Of Selectmen, Board Of Finance, Board Of Education, And CPPAC December 31, 2025 Memo On Bonding Timeline And Narrative - Illustrative Outline BONDING TIMELINE AND NARRATIVE.PDF 12 Pages Of Individual And Combined Debt Service Modeling DEBT SERVICE MODELING.PDF Two Page "Crosswalk" Detailing Stabilized Debt Service (In Lieu Of Volatile Debt Service) CROSSWALK - STABILIZED DEBT SERVICE.PDF Six-Page CIP Policy Discussion Focusing On Town Bond Requests CIP POLICY DISCUSSION_ TOWN REQUESTS.PDF Pictures And Backup Materials (Pages 1-11) For Town Requested Bonding Items PICTURES AND BACKUP_ TOWN REQUESTS.PDF New Business Board Of Education - Capital Priority Recommendations GRANBY PUBLIC SCHOOLS- CPPAC DISCUSSION .PDF High School Track Middle School Town - Capital Priority Recommendations Sewer Pumps Pickleball Courts/SBP Public Bathroom Facility Adjournment The next regular meeting of the Town of Granby CPPAC is scheduled for Monday, January 26, 2026 at 5 p.m. in the Town Hall Meeting Room. 1. 2. Documents: 3. 4. 4.I. Documents: 4.I.i. Documents: 4.I.ii. Documents: 4.I.iii. Documents: 4.I.iv. Documents: 4.I.v. Documents: 4.I.vi. Documents: 4.I.vii. Documents: 4.I.viii. Documents: 5. 5.I. Documents: 5.I.i. 5.I.ii. 5.II. 5.II.i. 5.II.ii. 6.
Page 3
TOWN OF GRANBY CAPITAL PROGRAM PRIORITY ADVISORY COMMITTEE MEETING MINUTES NOVEMBER 24, 2025 MEMBERS PRESENT: Kevin Hobson, Chairman; Margaret Chapple, John Adams, Heather Lombardo, Mark Neumann, and David Peling EX OFFICIO MEMBERS PRESENT: Cheri Burke, Superintendent of Schools; Michael Guarco, Chairman, Board of Finance; Monica Logan, Chairman, Board of Education, and Mike Walsh, Town Manager ABSENT: Mark Fiorentino, William Kennedy Chairman Kevin Hobson called the meeting of the Capital Program Priorit y Advisory Committee to order at 5:00 p.m. 1. PLEDGE OF ALLEGIANCE 2. MINUTES 2.I. Approval of CPPAC Meeting Minutes – October 27, 2025 ON A MOTION by M. Neumann, seconded by H. Lombardo, the Board voted (6-0-0) to approve the minutes of October 27, 2025, as presented. 2.II. Approval of CPPAC Meeting Minutes – November 3, 2025 ON A MOTION by M. Neumann, seconded by H. Lombardo, the Board voted (6-0-0) to approve the minutes of November 3, 2025, as presented. 3. PUBLIC COMMENT There was no public comment. 4. COMMUNICATIONS 4.I. None 5. NEW BUSINESS 5.I. Board of Education Presentation – Capital Priorities Charles Warrington, Jr. and Scott Pellman from Colliers Engineering & Design provided a presentation on the middle school including: an overview of the building, the grant process, the space standard calculation, state reimbursement and renovation status. The consultants identified the following next steps for the project: • Create an Educational Specification for the middle school to be approved by the BOE as is required for a future grant filing. • Complete a new Enrollment Study which will be the basis for establishing maximum projected enrollment. • Procure an architec tural design team to perform a detailed Facility Condition Assessment (FCA) along with compiling all required documents to determine
Page 4
CPPAC Minutes 11/24/25 Page 2 renovation status and provide high level concept design on building modifications and additions to meet the educational specifications. The full presentation can be found with the CPPAC agenda on the Town website. 5.II. Town Presentation – Capital Priorities Discussion 5.II.1. Parks & Recreation Study Anthony McGovern, Chairman of the Parks & Recreation Board, and Sandra Yost, Director of Community Services presented the results of the comprehensive Park Study done by GZA Geoenvironmental. The consultants produced a master plan which addresses input from the public, concerns of stakeholders and the effective use of Town resources. The plan examined both Salm on Brook Park and Ahrens Park, providing str ategies to balance usage across the two facilities. The recommendations are structured as a phased approach, guiding i mplementation over the course of several years to ensure sustainable and achievable progress. The P& R b oard reviewed the recommendations and prioritized those that would add the most value and address the biggest needs at the parks. The Town is requesting that CPPAC consider the following projects: • Upgrade the path to Route 20 parking lot from the soccer fields and expand ADA accessibility from the central parking lot to the soccer fields. A portion of this project will be funded by a STEAP grant. • Build four pickleball courts at the southern end of Salmon Brook Park. • Expand the utilities at the park and build a new restroom building between Fields 3 and 5 and the pickleball courts. If approved, this would be a smaller bond initiative coming out of the special Parks & Recreation Fund and would not be part of the General Fund. The full presentation can be found with the CPPAC agenda on the Town website. 5.II.2. Sewer Pumps Town M anager Mike Walsh and Kirk Severance, Director of Public Wo rks presented the current situation with the three sewer pumps that serve certain areas of the town, primarily around the central business district. The Town is asking CPPAC to consider a $1.5 million project to replace t wo of the pumps, one on Route 189 and one on the Route 10 and to add the SCADA system to the newest station in Salmon Brook Park to improve monitoring and control of the system. The majority of the funds will be spent on Route 10 station as it serves 90-95% of the sewer customers. It is important to note that this project is to maintain the current sewer system and will not expand the system. If approved, this bond initiative would come out of the special sewer fund and would be part of the General Fund. The full presentation can be found with the CPPAC agenda on the Town website. 5.II.3. Pickleball Court
Page 5
CPPAC Minutes 11/24/25 Page 3 This agenda item was covered in item 5.II.1 6. ADJOURNMENT ON A MOTION by M. Neumann, seconded by D. Peling , the Board voted ( 6-0-0) to adjourn the meeting at 7:28 p.m. The next meeting of the Capital Program Priority Advisory Committee will be held on Monday, January 5, 2026, at 5:00 p.m. The chairman cancelled the meetings scheduled for December. Respectfully submitted, Betsy Mazzotta Recording Secretary
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18
Page 19
Page 20
Page 21
Page 22
Page 23
Page 24
Page 25
Page 26
Page 27
Page 28
Page 29
Page 30
Page 31
Page 32
Page 33
Page 34
Page 35
Page 36
Page 37
Page 38
Page 39
Page 40
Page 41
Page 42
Page 43
Page 44
Page 45
Page 46
Page 47
Page 48
Page 49
Page 50
Page 51
Page 52
Page 53
Page 54
Page 55
Page 56
Page 57
Page 58
Page 59
Granby Public Schools: Capital Improvement Plan Discussion January 5, 2026 _______________________________________________________________________________________ Forward The Granby Board of Education, in compliance with the Town Charter, compiles a 10-Year Capital Improvement Plan. That plan serves as a working document in support of the annual budget and to track the capital projects/items that are used to support the ongoing operations of the School District. As background, each of the capital projects/items included in the 10-Year Capital Improvement Plan list represents the Board of Education’s best estimate of the cost to complete that project or buy that item. It is important to note that each line in the plan has not been individually scoped, sized, costed, or bid, but simply represents a starting point should a project/item be selected for execution. Therefore, when funding is put into place, the real project work begins including developing and issuing a request for proposals (RFP). Project Overview – Athletic Complex Project Description – Stadium Field and Field Two This project proposes the urgent replacement of Stadium Field and Field Two at Granby Memorial High School to address documented structural failures, age, and safety concerns. The existing turf track and field system was originally installed in 2013 and has been carefully maintained; however, it has now exceeded its expected service life and is experiencing significant subsurface failure that cannot be resolved through surface repairs alone. The project will include full removal of the existing turf and track systems, remediation of unstable subsurface conditions, and installation of new, long-term athletic field infrastructure designed to provide safe, reliable, and multi-use facilities for students and the broader Granby community. Stadium Field will continue to serve as a central venue for interscholastic athletics, physical education, community recreation, and major school and town events, while Field Two will support expanded athletic programming and scheduling flexibility. Rationale / Need The need for replacement of Stadium Field and Field Two is immediate and compelling. In recent years, Stadium Field has experienced recurring sinkholes and surface depressions, creating safety hazards that have led to restrictions on use and the inability to host track and field competitions. These conditions pose ongoing risks to student-athletes, staff, and community members. Field Two, although not showing the same wear and tear is the same age and resurfacing is necessary. Completing both fields at the same time allows for a cost savings of $125,000. Scope of Work The Board of Education proposes a targeted scope that prioritizes durability, cost control, and long-term value: Reconstruction of the existing Stadium Field and track surface using a post-tension concrete system designed to span unsuitable soils and provide long-term structural stability. Stadium Field and Field Two: ● Installation of new synthetic turf and track surfacing ● Drainage improvements, fencing, and associated site work as required ● Retrofit of Existing Lighting: ○ Removal and disposal of existing light fixtures ○ Installation of new energy-efficient LED fixtures
Page 60
Timeline Considerations Based on current planning assumptions, construction of the Stadium Field and track improvements is anticipated to occur during a spring/summer construction window, with an estimated duration of approximately five (5) months, depending on final scope and sequencing. Lighting retrofits and turf field installations would be coordinated to minimize disruption to athletic seasons and school operations. Budget Estimate Stadium Field and Track Reconstruction, Field Two Replacement: Estimated at $5.9million, based on the post-tension concrete system and associated improvements. Athletic Lighting Retrofit: Estimated at $200,000 – $250,000, including removal of existing fixtures and installation of LED lighting using existing poles. Total for Stadium Track and Field and Field Two with lighting: Estimated at $6.1 million Recommended Contingency: 8%–10% for design, general conditions, and construction to account for unknown site conditions Project Description – Turf Baseball/Softball Field This project proposes the reconstruction of the existing baseball field into a new all-weather synthetic turf facility designed to accommodate baseball, softball, and overlay field configurations. The goal of the project is to create a durable, multi-use athletic venue that increases field availability, improves safety and playability, and significantly reduces weather-related disruptions and long-term maintenance costs. The existing natural grass field will be fully removed, including fencing, topsoil, irrigation systems, and clay surfaces. Earthmoving activities will be conducted to achieve the proposed grades. Once grading is complete, the project will include installation of concrete turf anchor curbing, a stone base system, and a comprehensive drainage network to support long-term performance of the synthetic turf surface. New fencing of varying heights and configurations will be installed and integrated directly into the concrete turf anchor curb system. Additional elements such as new dugouts, LED lighting fixtures, bleachers, walkways, batting cages, bullpen areas, and a scoreboard are identified as alternates and may be incorporated depending on final scope and funding. The Board of Education proposes fundraising for these additional enhancements. Timeline Considerations Depending on final scope selection, the baseball and softball field project is anticipated to be constructed within an approximately four-month timeframe, with nearby access and staging areas available. Additional coordination, review, and programming will be required to finalize scope and budget prior to construction. Budget Estimate ● Base Project (Synthetic Turf Baseball/Softball Field): approximately $3.4 million (subject to refinement) ● Recommended Contingency: 8%–10% for design, general conditions, and construction to account for unknown site conditions ● New LED lighting fixtures (8-pole system): $750,000
Page 61
Project Description – Bathroom for Athletics Complex With upgrades to the athletics complex, the district anticipates increased use from students, families, and community members. Currently, there is not a bathroom near the fields. The porta-potties currently onsite are not heated, require constant attention and replacement, and do not provide an aesthetically appropriate permanent amenity. Furthermore, these units are not easily accessible for all people. The addition of a year-round bathroom facility is strongly supported by the Board of Education and was cited in the original plans for the athletics complex in 2007. Rationale / Need A permanent, accessible bathroom facility is necessary to support expanded athletics programming, school events, and daily community use. Providing a year-round bathroom improves health and safety, enhances the visitor experience, and reduces ongoing operating costs and maintenance challenges associated with temporary portable facilities. Scope of Work ● Site evaluation and selection of appropriate utilities approach ● Connection to sewer service or installation of an approved leach field system ● Extension of water service to the site ● Construction of a suitable, year-round heated accessible bathroom facility ● Coordination with overall athletics complex construction to capitalize on mobilization efficiencies Timeline Considerations Timeline will be coordinated with the broader athletics complex work to take advantage of site access, contractor mobilization, and utility trenching. The final schedule will be developed based on design and permitting. Budget Estimate The district estimates the construction of a year-round bathroom facility will cost approximately $750,000. Given the work needed on the larger athletics complex project, there is a possible synergistic opportunity to complete this much-needed amenity efficiently at a lower cost. Recommended Contingency: 8%–10% for design, general conditions, and construction to account for unknown site conditions Project Overview – Granby Memorial Middle School Project Description Granby Memorial Middle School is a 75,000 square foot facility originally constructed in 1992, with most major building systems now more than 30 years old. A Visual Facilities Conditions Assessment completed in May 0f 2025 found that while the building remains functional, many core mechanical systems—particularly HVAC, elevators, electrical, kitchen infrastructure, and plumbing—are beyond the end of their expected useful life and require targeted upgrades to ensure continued safe and effective operation. Additionally, a significant percentage of the building does not have any life safety fire suppression sprinkler systems. Rationale / Need A more detailed Facilities Conditions Assessment is necessary to further uncover specific needs however, at this time we know that the current HVAC system requires some attention due to the aging equipment and components that rely on outdated parts no longer in production. These conditions directly impact indoor air quality, comfort, and reliability. In addition, the current kitchen and supporting plumbing and electrical systems reflect the building’s age and no longer fully meet current operational and programmatic needs. Immediate attention to these systems is necessary to address
Page 62
deferred maintenance, reduce the risk of system failure, and support a healthy learning environment for students and staff. Scope of Work Although a full renovation of the current building was proposed to CPPAC, feedback from CPPAC to the Board of Education is that this approach is cost prohibitive at this time and additional information is necessary to evaluate the full cost of the project. Therefore, the BOE will limit the current consideration to a comprehensive facilities assessment to precisely inform the scope of work necessary. As planning continues for a GMMS renovation, it is important to note at this juncture that while a phased approach would allow the district to strategically invest in the building over time, extend the useful life of major systems and align capital improvements with available funding and operational needs, a phased approach does not account for longer periods of disruption to the learning environment and does not allow for state reimbursement (currently 46.43%) for "renovate to new" school district projects. Timeline Considerations Each project will be assessed individually once further details are gathered in order to determine a timeline that is least disruptive to the learning environment. Projects will occur over the summer months and school vacations while the building is closed to students whenever possible. Budget Estimate Specific HVAC assessment will be complete in April of 2026. In addition, The Board of Education will contract for a comprehensive Facilities Conditions Assessment to determine priorities and engage in architectural plans for future consideration. In reliance upon previously done repairs and the visual assessment, the estimate at this time to conduct necessary repairs and engage with an architectural design firm is $1.75 Million. Recommended Contingency: 8%–10% for design, general conditions, and construction to account for unknown site conditions. Summary of Estimated Costs: Stadium Track & Field,Field Two and Lights: $6,100,000 Softball and Baseball Field with Lights: $4,150,000 Bathroom Facility: $750,000 Middle School Exploration and Repairs: $1,750,000 Bond Request $12 million Fundraising $750,000 Total: $12,750,000