RFP: Town Campus Sidewalk Connections Project

East Granby town newsPosted Apr 2, 2025Town NewsOriginal post on the town site

Summary

AI-generated summary of the post and its attached files, checked against their text (dollar figures). Written Nov 22, 2026; the town may have updated the post since.

The Town of East Granby posted RFP documents and Addendum No. 1 (April 28, 2025) for the Town Campus Sidewalk Connections Project, which builds new 5-foot concrete sidewalks, ramps, landscaping, striping and a bituminous pathway on the town campus. Contractors bidding on this state-funded project must submit sealed bids by May 6, 2025.

  • Sealed bids are due May 6, 2025 at 1:00 p.m. at East Granby First Selectwoman's office, 9 Center Street, and will be publicly opened and read.
  • Addendum No. 1 states the project received a CT DOT Community Connectivity Grant of $690,000 for construction, contingency and incidental costs.
  • Addendum No. 1 revises the Bid Form (pages 1/2 and 2/2) and adds special provision 0219011A Sedimentation Control at Catch Basins; Turf Establishment and Maintenance & Protection of Traffic follow CT DOT Form 819 with no special provisions.
  • Approximately 400 square feet of staging area is provided in the Community Center parking lot; any staging areas must be enclosed with a minimum 6-foot chain-link fence with lockable gates.
  • The Town will not accept excess fill from the project. No subsurface borings were performed; rock excavation covers boulders over one cubic yard.

Dates mentioned: April 8, 2025 (non-mandatory pre-bid meeting, past); April 28, 2025 (Addendum No. 1 issued); May 6, 2025 at 1:00 p.m. (bid opening)

Attached files (4)

1419 Addendum 1 EG Town Campus 2025 04 28 · PDF, 9 pages

Open the PDF download · town site copy

Text read from the scan by OCR (may contain errors)
1 
TOWN OF EAST GRANBY 
Town Campus Sidewalk Project 
ADDENDUM No. 1 
April 28, 2025 
Bidders are hereby informed that the Project Manual and Drawing for the above-mentioned contract 
are modified, corrected, and/or supplemented as follows and that Addendum No. 1 shall become part of 
the Contract Documents. 
C
larification: 
• The Town of East Granby has received a CT DOT Community Connectivity Grant in the amount of
$690,000 for the construction, contingency and incidental costs associated with the project.
• The Town of East Granby will provide approximately 400 square feet of staging area in the
Community Center parking lot.
• For those interested in electronic files of the drawings, please email the attached disclosure
form to Beth Nesteriak at beth@bbengrs.com. Once received, the DWG files will be sent to the
requestor.
Q
uestions: 
1. Wi
ll the Town take excess fill from the project?
T
he Town will not accept any excess fill from the project. 
2. I
s the intent of spec section 013553 Security Procedures for the contractor to furnish & install
construction fencing around work areas? Not really sure of Contractor responsibility of part
1.03.A&B to restrict entrance of persons & vehicles into project site
T
he Contractor shall be responsible for maintaining a safe, secure, and orderly job site at all times. All 
open work areas must be adequately barricaded and clearly signed in accordance with CT DOT standards 
to prevent unauthorized public access, mitigate risks of theft or vandalism, and ensure public and worker 
safety. 
Al
l designated staging areas shall be enclosed with a minimum 6-foot-high chain-link fence to restrict 
access. Gates shall be lockable and remain secured when not in use. The Contractor shall ensure 
compliance with all applicable OSHA regulations, CT DOT guidelines, and local ordinances pertaining to 
construction site safety and security. 
3. P
lease provide a Special Provision for 0219011A Sedimentation Control at Catch Basins
T
he special provision is attached and made part of these contract documents. 

2 

4. The bid form has the following items as Special Provisions (“A” items) 0940019A Turf 
Establishment - Lawn, and 0971001A Maintenance & Protection of Traffic. The bid documents 
do not include these items in the Special Provisions portion.  

Items 0940019 and 0971001 do not include any special provisions. Form CT DOT 819 should be followed. 

A revised Bid Form is attached and made part of these contract documents. 

5. Bid form has Vinyl Fence as item 0905011 but Special Provisions has a specification for Vinyl 
Fence as 0905012A Manufactured by Atlas Fence. Is this the only type of Vinyl Fence that is to 
be installed for this project? 

All materials used for this work shall conform to the specified requirements or be approved as equal. 

6. Note that item 0977001 Traffic Cone has a quantity of 200 each. Is this the intent or a typo? 

The quantity for traffic cones is 200. 

7. Were there any borings performed on this project and if so can that information be made 
available? We see an item for Rock Excavation (#0202100) and was looking for where it is 
located throughout the project. 

No subsurface borings were performed for this project. The Rock Excavation item is included to account 
for the potential removal of large boulders exceeding one (1) cubic yard in volume, should they be 
encountered during construction. 
 

Page 1 of 2 
(Fill In Company Name) 
AGREEMENT FOR THE 
TRANSFER OF ELECTRONIC FILES 
We,
 B&B Engineering, LLC and/or Accurate Land Surveying, LLC., herein referred to as the 
"Consultant", agree to forward electronic files for Town of East Granby Town Campus Sidewalk 
Connections Project to  ______________________________________________, herein referred to as 
the "Recipient". 
The Recipient agrees that these files are an instrument of service only for their use and 
only for this project and they further agree to not provide copies of these files to any other party 
without written consent of the Consultant. 
These files have been prepared to our current specifications and are based on AutoDesk 
software. These files may not be compatible with the Recipient's hardware, operating system and/or 
system specifications/software, and may not convert to your system. We are not responsible for 
any expenses the Recipient may incur utilizing these files. We are not responsible for any 
inaccuracies or data that is lost as a result of your use of these files. 
If the files are not emailed, the media on which they are transferred has a limited unknown life 
span and we are not responsible for the content of these files on said media 30 calendar days after your 
receipt. 
Regardless of the method of file transfer, please review these files within 10 calendar 
days of your receipt and report to our office any problems you may encounter utilizing these files. 
We are under no obligation to the Recipient and/or any third party to maintain or retain 
these files and/or convert them to future software and/or hardware systems unless under 
separate written agreement. Please review the terms and conditions more specifically noted on 
the reverse side or attached sheet. 
Accepted by  (Signature) Date 
Print Name Title 
Company Email Address 
J1419

Page 2 of 2 
T
ERMS AND CONDITIONS FOR THE 
TRANSFER OF ELECTRONIC FILES 
1.0
 ACCEPTANCE: 
Because data stored on electronic media can deteriorate undetected or be modified 
without the Consultant's knowledge, the Recipient agrees that it will accept responsibility 
for the completeness, correctness, or readability of the electronic media after an 
acceptance period of no more than 30 calendar days after delivery of the electronic files, 
and that upon the expiration of this acceptance period, the Recipient will indemnify and 
save harmless the Consultant for any and all claims, losses, costs, damages, awards or 
judgements arising from the Recipients use of the electronic files or output generated 
from them. The Consultant agrees that it is only responsible for the accuracy of the 
sealed drawings that may accompany a project’s submittal, and that such accuracy is 
defined as the care and skill ordinarily used by members of the Consultant's profession 
practicing under similar conditions, at the same time and in the same locality. The 
Consultant makes no warranties, expressed or implied, under this agreement or 
otherwise, in connection with the Consultant's services. 
2.0 
 OWNERSHIP OF CADD FILES 
The information on the electronic media is considered part of the Consultant's instrument 
of service and shall not be used on other projects, for additions to this project, or for 
completion of this project or portion thereof by another design professional, except by 
agreement in writing with appropriate compensation and legal protection provided to the 
Consultant. 
3.0 
 RIGHT/ABILITY TO ALTER/EDIT FILES 
Any use or reuse of altered files by the Recipient or others, without written verification or 
CADD adaptions by the Consultant for the specific purpose intended, will be at the 
Recipient's risk and full legal responsibility. Furthermore, the Recipient will, to the fullest 
extent permitted by law, indemnify and hold the Consultant harmless from any and all 
claims, suits, liability, demands, judgements, or costs arising out of or resulting therefrom.  Any 
verification of such adaption by the Recipient will entitle the Consultant to additional 
compensation. 
J1419

 0219011A - 1 SEDIMENTATION CONTROL 
  AT CATCH BASIN 
ITEM 0219011A - SEDIMENTATION CONTROL AT CATCH BASINS 

Description:  This work shall consist of furnishing, installing, cleaning, maintaining and 
removing sedimentation control at catch basins at the locations and as shown on plans and as 
directed by the engineer. 

Materials:  The sediment control device shall be manufactured from a specially designed woven 
polypropylene geotextile sewn by a double needle machine, using a high strength nylon thread. 
The sediment control device shall be manufactured by one of the following or an approved 
equal: 
Siltsack® 
SI Geosolutions: 
www.sigeosolutions.com 
(800)621-0444 

Dandy Sack™ 
Dandy Products Inc. 
P.O. Box 1980 
Westerville, Ohio 43086 
Phone: 800-591-2284 
Fax: 740-881-2791 
Email: dlc@dandyproducts.com 
Website: www.dandyproducts.com 

FLeXstorm Inlet Filters 
Inlet & Pipe Protection 
24137 W. 111th St - Unit A 
Naperville, IL 60564 
Telephone: (866) 287-8655 
Fax: (630) 355-34 

The sediment control device will be manufactured to fit the opening of the catch basin or drop 
inlet. The sediment control device will have the following features: two dump straps attached at 
the bottom to facilitate the emptying of sack and lifting loops as an integral part of the system to 
be used to lift sack from the basin. The sediment control device shall have a restraint cord 
approximately halfway up to keep the sides away from the catch basin walls, this cord is also a 
visual means of indicating when the sediment control device should be emptied. Once the strap is 
covered with sediment, the sediment control device should be emptied, cleaned and placed back 
into the basin. 

 0219011A - 2 SEDIMENTATION CONTROL 
  AT CATCH BASIN 

Construction Methods:  Installation, removal, and maintenance shall be per manufacturer 
instructions and recommendations. 

Method Of Measurement:  Sedimentation Control at Catch Basin will be measured as each 
installed, cleaned, maintained, accepted, and removed. There will be no separate measurement 
for maintenance or replacement associated with this item 

Basis Of Payment:  Sedimentation Control at Catch Basin will be paid for at the contract unit 
price each complete in place and accepted, which price shall include all materials, equipment, 
tools, and labor incidental thereto. 

Pay Item     Unit 
Sedimentation Control at Catch Basin  Ea. 
 

0201001A Clearing and Grubbing 1 L.S.
0202000 Earth Excavation 225 C.Y.
0202100 Rock Excavation 100 C.Y.
0202351 Unsuitable Material Excavation 150 C.Y.
0202529 Cut Bituminous Concrete Pavement 400 L.F.
0212000 Subbase 140 C.Y.
0219003 Sedimentation Control Filter Fabric Fence System 750 L.F.
0219011A Sedimentation Control at Catchbasin 15 E.A.
0406172 HMA S0.375 12 Ton
0814005 Reset Granite Curved Stone Curbing 15 L.F.
0815001 Bituminous Concrete Lip Curbing 230 L.F.
0921001 Concrete Sidewalk 11,590 S.F.
0921002A Monolithic Concrete Sidewalk and Curb 200 S.F.
0921005 Concrete Sidewalk Ramp 550 S.F.
0921048 Detectable Warning Surface 140 S.F.
0922501 Bituminous Concrete Driveway 40 S.Y.
0944000 Furnishing and Placing Topsoil 3,010 S.Y.
0940019 Turf Establishment-Lawn 3,010 S.Y.
0949846 Acer Saccharum Sugar Maple   2"-2 1/2" cal. 1 E.A.
0971001 Maintenance and Protection of Traffic 1 L.S.
BID FORM
Town Campus Sidewalk Connections Project
East Granby, Connecticut
(Note: All prices must be clearly written in ink or typed, in words as well as figures, for the entire bid.)
Item No. Brief Description Unit Price in 
Figures
Total In WordsEstimated 
Quantity
Total in Figures
Contractor Name:
Contractor Contact & Email:
1/2 Revised Via Addendum #1
Town Campus Sidewalk Connections Project
East Granby, CT

BID FORM
Town Campus Sidewalk Connections Project
East Granby, Connecticut
(Note: All prices must be clearly written in ink or typed, in words as well as figures, for the entire bid.)
Item No. Brief Description Unit Price in 
Figures
Total In WordsEstimated 
Quantity
Total in Figures
Contractor Name:
Contractor Contact & Email:
0975003 Mobilization 1 L.S.
0977001 Traffic Cone 200 E.A.
0970006A Trafficperson (Municipal Police Officer) 1 ALLOW $60,000.00 $60,000.00 Sixty thousand dollars
0970007A Trafficperson (Uniformed Flagger) 150 HR.
0978002 Traffic Drum 25 E.A.
0980020 Construction Surveying 1 L.S.
1206023A Removal and Relocation of Existing Signs 7 E.A.
1206090A Relocate Wooden Sign 1 E.A.
1210105 Epoxy Resin Pavement Markings, Symbols and Legends 1,480 S.F.
0905012A Vinyl Fence 50 L.F.
1220027A Construction Signs 200 S.F.
1302061A Adjust Gate Box (Water) 2 E.A.
1302062A Adjust Gate Box (Gas) 1 E.A.
Base Bid Total in Words
Note: All quantities are estimated and used for comparison of bids. It is understood that the various unit prices bid will control in any contract which may be 
awarded arising from this Bid.  In the event of any discrepancies between numerical values and the corresponding written amounts, the Town reserves the right to 
use the values that result in the least cost to the Town. This includes any mathematical or clerical errors.
The Owner reserves the right to delete any Item of Work. Bidder agrees that the Work will be substantially completed and completed on or before the dates or 
within the number of days indicated in the Agreement. Bidder accepts the provisions of the Agreement as to liquidated and special damages in the event of failure 
to substantially complete the Work on time. 
Base Bid Total in Figures
2/2 Revised Via Addendum #1
Town Campus Sidewalk Connections Project
East Granby, CT

\\10.0.0.21\b&b\Job Data\1400-1499\1419\Bidding\2025 04 07 Pre Bid Sign In.xlsx

[tbl-0.md](tbl-0.md)

* PLEASE BE SURE TO PRINT LEGIBLY - IF POSSIBLE, LEAVE A BUSINESS CARD

Pre-Bid Meeting

Date:

Page _____ of _____

Town of East Granby | Town Campus Sidewalk
Pre-Bid Meeting

RFP Project Manual Published 1419 Town Campus Sidewalk Specification · PDF, 260 pages

Open the PDF download · town site copy

Text of the file
PR
OJECT MANUAL 
FOR 
Town Campus Sidewalk Connections Project 
CCGP Project Number: 0170-3513GR 
P
repared for: 
Town of East Granby 
9 Center Street 
East Granby, Connecticut 06026 
(860) 6
53-2576
Town campus is to be maintained by the Town of East Granby. The State of 
Connecticut Department of Transportation Standard Specifications for Roads, 
Bridges, Facilities and Incidental Construction (Form 819) and all supplements 
thereto shall govern this project. 
Prepared by: 
15 R
esearch Drive, Suite 3 
Woodbridge, Connecticut 06525 
Phone: (203) 881-8145 
www.bbengrs.com 
Job No. 1419 


TOC-1 

Town Campus Sidewalk Connections Project 
Town of East Granby 
9 Center Street 
East Granby, Connecticut 

Table of Contents 

Section  Title          

DIVISION 00 – PROCUREMENT AND CONTRACT REQUIREMENTS 

00 11 13 Advertisement for Bids        
00 21 13 Instructions to Bidders                 
00 41 53 Bid Form          
00 45 00 Bidder’s Affidavit        
00 45 13 Bidder’s Qualification Statement       
00 45 19 Non-Collusive Bidding Certification    
00 45 33 Non-Discrimination Laws/Executive Orders 
00 45 36 Equal Employment Opportunity     
00 45 43 Certified Copy of Resolution of Board of Directors     
00 45 70 CHRO Contract Compliance Regulations 
00 52 13 Agreement                    
00 61 00 Bid Bond         
00 61 13.13 Performance Bond         
00 61 13.16 Payment Bond  
00 62 76 Applications for Certification for Payment      
00 70 00 General Conditions                  
00 73 00 Supplementary General Conditions 
Attachments to Supplementary Conditions 
A. Connecticut State Wage Rates 
B. Contractors Wage Certification Form  
C. Notice to Contractor 
D. Construction Contracts-Required Contract Provisions (state 
funded only contracts) 

DIVISION 01 – GENERAL REQUIREMENTS 

01 11 00  Summary of Work 
01 13 00  Obligations of Contractors to Owners 
01 14 00  Work Restrictions 
01 32 13  Scheduling of Construction 
01 33 00  Submittal Procedures 
01 35 53  Security Procedures 
01 55 26  Traffic Control 
01 60 00  Product Requirements  
 

TOC-2 
*The numbers and titles presented above utilize The Construction Specifications Institute
MasterFormat 2016 Edition Numbers and Titles.
I
NDEX TO SPECIAL PROVISIONS 
I
NTRODUCTION TO THE SPECIAL PROVISIONS 
S
ECTION 1.08 Prosecution and Progress 
ITEM #0201001A Clearing and Grubbing 
ITEM #0921002A Monolithic Concrete Curb and Sidewalk 
ITEM #0970006A Traffic person (Municipal Police Officer) 
ITEM #0970007A Traffic person (Uniformed Flagger) 
ITEM #1206023A Removal and Relocation of Existing Signs 
ITEM #1206090A Relocate Wooden Sign 
ITEM #1220027A Construction Signs 
ITEM #1302061A Adjust Gate Box (Water) 
ITEM #1302062A Adjust Gate Box (Gas) 
ITEM #0905012A Vinyl Fence 
DRAW
INGS 
Drawing No. Series Drawing Title 
01-01 Cover Sheet 
03-01 – 03-02 Existing Conditions Plans 
11-01 – 11-02 Site Layout Plans 
12-01 – 12-02 Grading Plans 
18-01 – 18-02 Soil Erosion & Sediment Control Plans 
19-01 – 19-12 Construction Details 
E
ND OF SECTION 

TOWN CAMPUS SIDEWALK CONNECTIONS PROJECT 
D
IVISION 00 00 00 
PR
OCUREMENT AND CONTRACTING 
REQUIREMENTS 

00 11 13 - 1 
TOWN OF EAST GRANBY 
EAST GRANBY, CONNECTICUT 

Town Campus Sidewalk Connections 

ADVERTISEMENT FOR BIDS 

Sealed Bids for the Town Campus Sidewalk Connections Project will be received by the Town of East 
Granby, First Selectwoman’s office at, 9 Center Street, East Granby, Connecticut 06026 until  May 6, 2025 
at 1:00 p.m. local time at which time they will be publicly opened and read. 

The project consists of the construction of new 5’ wide concrete sidewalks within the town campus along 
Center Street, Veterans Memorial Drive, and portions of South Main Street and Turkey Hill Road.  The 
project includes landscaping, striping, and pedestrian facilities including accessible ramps. There will be 
several connections to existing concrete and asphalt sidewalks . The work also consists of replacement of an 
existing gravel parking connection path with a bituminous pathway . The foregoing is a general description 
only and shall not be construed as a complete description of the Work to be performed for this Project. 

Bidding and Contract Documents may be viewed and downloaded on the Town’s website, 
www.eastgranbyct.org 

Partial sets of Bidding and Contract Documents will not be available.  The Town of East Granby will not be 
responsible for full or partial sets of Contract Documents, including any addenda, obtained from other 
sources. 

The project is funded by the Community Connectivity Grant Program (CCGP) from the State of Connecticut, 
which is administrated by the Connecticut Department of Transportation. The State Project Number is 0170-
3513GR 

The contractor who is selected to perform this State funded project must comply with Sections 4a -60 and 4a-
60a of the Connecticut General Statutes and An Affirmative Action Plan must be filed with and approved by 
the Commission on Human Rights and Opportunities prior to the commencement of construction. 

State law requires a minimum of 25 percent of the state-funded portion of the contract for award to 
subcontractors holding current certification from the Connecticut Department of Administrative Services 
(“DAS”) under the provisions of CONN. GEN STAT. 4a-60g. as amended. (25% of the work with DAS 
certified Small and Minority owned businesses and 25% of that work with DAS certified Minority, 
Women and/or Disabled owned businesses.) The contractor must demonstrate good faith effort to meet 
the 25% set-aside goals. For municipal public works contracts and quasi-public agency projects, the 
contractor must file a written or electronic non-discrimination certification with the Commission on 
Human Rights and Opportunities. Forms can be found at 
http://www.ct.gov/opm/cwp/view.asp?a=2982&q=390928&opmNav_GID=180 
Contractor must coordinate directly with CHRO. 

00 11 13 - 2 
PRE-BID MEETING 
A non-mandatory Pre-Bid meeting of bidders will be held in regards to this project.  This meeting will take 
place on Tuesday, April 8, 2025  at 11:00 a.m. local time at the East Granby Town Hall, Town Meeting 
Room, 9 Center Street, East Granby, Connecticut 06026. 

BID SECURITY 
Bid security in the amount of five (5) percent of the bid must accompany each bid in accordance with the 
Instructions to Bidders. The successful bidder must furnish a Performance Bond and Payment Bond in the 
amount of 100% of the Project bid cost. 

QUALIFICATIONS OF BIDDERS 
Bidders will be required to furnish information regarding their qualifications to perform the work as set forth 
in the Instructions to Bidders.  

The attention of bidders is called to the requirements of non -discrimination in employment practices, 
conditions of employment, and prevailing  wage rates to be paid.  The Town of East Granby  will not 
knowingly conduct business with providers of goods or services that are known to discriminate.  The Town 
of East Granby  encourages responses to its purchasing needs from Women -owned and Minority- owned 
enterprises. The Town of East Granby is an Equal Opportunity Employer. 

No Bidder may withdraw his Bid within ninety (90) calendar days after the date set for the receipt thereof.  In 
the event that the Town of East Granby  requires more than ninety (90) calendar  days after the actual date of 
the receipt of Bids and the selected, qualified Bidder does not grant an extension of time, the Town  reserves 
the right to award the Contract to another qualified Bidder who does grant an extension of time to award. 

Bidders are required to personally inspect the job site area to ascertain information on site conditions. 

Bidder is required to self-perform a minimum of 50% of the total contract value.  

Contract commencement and completion time will be in accordance with Article 3 of the Agreement , located 
within the project manual. 

RIGHT TO REJECT BID 
The right is reserved to reject any or all bids, in whole or in part, to award any items, group of items or total 
bid, and to waive any informality or technical defects, if it is deemed to be in the best interest of the Town of 
East Granby. 

The Town reserves the right to reject any or all bids pursuant to Section 16 of Connecticut Special Act No. 
77-98, as amended. 

Eden Wimpfheimer 
First Selectwoman 
Town of East Granby, CT 
Date:  April 3, 2025 

END OF SECTION 

 00 21 13-1 INSTRUCTIONS TO BIDDERS 
SECTION 00 21 13 
INSTRUCTIONS TO BIDDERS 
1. DEFINED TERMS 
Terms used in these Instructions to Bidders have the meanings assigned to them in the 
General Conditions. 
Certain additional terms used in the Bidding Documents have the meanings indicated 
below which are applicable to both the singular and plural thereof: 
1.1. Bidder—one who submits a Bid to Owner as distinct from a sub- bidder, who 
submits a Bid to a Bidder. 
1.2. Apparent Low Bidder —that Bidder whose Bid as offered in the Bid Form 
represents the lowest total. 
1.3. Engineer – Individual or entity named as such in the Agreement. 
1.4. Owner – the Town of East Granby. 
1.5. Successful Bidder—lowest, responsible and responsive qualified Bidder to whom 
Owner (on the basis of Owner's evaluation as hereinafter provided) makes an 
award. 
2. BIDDING DOCUMENTS 
2.1. Complete sets of Bidding Documents must be used in preparing Bids. Neither 
Owner nor Engineer assumes any responsibility for errors or misinterpretations 
resulting from use of incomplete sets of Bidding Documents. 
2.2. Bidding Documents made available on the above terms are only for the purpose of 
obtaining Bids for the Work and shall not be used for any other purpose. 
3. QUALIFICATIONS OF BIDDERS 
3.1. Bidders shall be experienced in the kind of Work to be performed, shall have the 
necessary equipment therefore, and shall possess sufficient capital to properly 
execute the Work within the time allowed. 
3.2. To demonstrate qualifications to perform the Work, Bidder shall submit, within 
5 days of Owner's request, written evidence such as financial data, previous 
experience, present commitments, and other such data as may be called for below. 
3.3. Each Bid must contain evidence of Bidder's qual ification to do business in 
Connecticut or covenant to obtain such qualification prior to contract award. 
3.4. Nothing indicated herein will prejudice Owner's right to seek additional pertinent 
information as is provided in Article 22 BASIS OF AWARD; AWARD OF 
CONTRACT. 
3.5. Bidders shall have experience with similar construction projects, including 
excavation, trenching, storm drainage and utility installation, roadway and parking 
lot installations, and landscaping. 
3.6. Bidders are advised that Section 12-430(7) of the Connecticut General Statutes, as 
amended, puts certain responsibilities on parties that enter into agreements with 

 00 21 13-2 INSTRUCTIONS TO BIDDERS 
non-resident contractors.  Any bidder which is a “non- resident contractor” as the 
term is defined in section 12- 430(7) of the Connecticut General Statutes shall be 
required to file a bond with the Connecticut Department of Revenue Service s to 
ensure compliance with the Act. 
3.7. All Contracts that exceed $100,000 for construction, renovations or repai rs must 
follow Section 31- 53b of the Connecticut General Statutes, as amended , 
“Construction Safety Training”.  
4. PREBID MEETING 
4.1. A non-mandatory Pre-Bid meeting, for Bidders only, will be held at 1 1:00 a.m. on 
April 8, 202 5. The Bidders will meet at the  East Granby  Town Hall , 9 Center 
Street, East Granby, Connecticut 06026.  
5. LICENSE REQUIREMENTS 
5.1. Contractors and Subcontractors, in order to perform public work in the State of 
Connecticut, are required to hold prior to award of contract State of Connecticut 
Contractor's Licenses of the class required to perform the specified Work. 
6. EXAMINATION OF CONTRACT DOCUMENTS AND SITE 
6.1. It is each Bidder's responsibility, before submitting a Bid, to: 
6.1.1. Examine thoroughly the Bidding Documents and other related data 
identified in the Bidding Documents. 
6.1.2. Inspect the site to become familiar with and satisfy Bidder as to the 
general, local, and site conditions that may affect cost, progress, 
performance, or furnishing of the Work. 
6.1.3. Consider federal, state, and local Laws and Regulations that may affect 
cost, progress, performance, or furnishing of the Work. 
6.1.4. Study and carefully correlate Bidder's knowledge and observations with 
the Bidding Documents and such other related data. 
6.1.5. Promptly notify Engineer of all conflicts, errors, ambiguities, or 
discrepancies, which Bidder has discovered in or between the Bidding 
Documents and such other related documents. 
6.2. Reference is made to the Supplementary Conditions for identification of: 
6.2.1. Those reports, if any, of explorations and tests of subsurface conditions at 
the site which have been utilized by Engineer in preparation of the Bidding 
Documents. 
6.2.2. Those drawings, if any, of physical conditions in or relating to existing 
surface and subsurface structures (except Underground Facilities) which 
are at or contiguous to the site which have been utilized by Engineer in 
preparation of the Bidding Documents. 
6.3. Provisions concerning responsibilities for the adequacy of data furnished to 
prospective Bidders on subsurface conditions, other physical conditions and 
Underground Facilities, and possible changes in the Contract Documents due to 
differing or unanticipated conditions appear in paragraphs  4.02 through 4.04 of the 
General Conditions. 

 00 21 13-3 INSTRUCTIONS TO BIDDERS 
6.4. Before submitting a Bid, each Bidder will be responsible to make or obtain such 
additional or supplementary examinations, investigations, explorations, tests, 
studies, and data concerning conditions (surface, subsurface, and Underground 
Facilities) at or contiguous to the site or otherwise and which may affect cost, 
progress, performance, or furnishings of the Work and which Bidder deems 
necessary to determine its Bid. 
6.5. Reference is made to the General Requirements for identification of the general 
nature of work that is to be performed at the site by Owner or others and that 
relates to Work for which a Bid is to be submitted. On request, Owner will provide 
to each Bidder, for examination, access to or copies of contract documents (other 
than portions thereof related to price) for such work by others. 
6.6. The submission of a Bid will constitute an incontrovertible representation by 
Bidder that Bidder has complied with every requirement of this article; that 
without exception the Bid is premised upon performing and furnishing the Work 
required by the Bidding Documents and applying the specific means, methods, 
techniques, sequences, or procedures of construction (if any) that may be shown or 
indicated or expressly required by the Bidding Docu

Only the beginning is shown here; the whole file is searchable. Open the PDF for the rest.

RFP 1419 Town Campus Sidewalk Connections Maps Full Set March 7 2025 · PDF, 21 pages

Open the PDF download · town site copy

Text read from the scan by OCR (may contain errors)
TOWN CAMPUS SIDEWALK CONNECTIONS
TOWN CAMPUS
EAST GRANBY, CONNECTICUT
LOCATION MAP
SCALE: 1"=500'
TOWN CAMPUS SIDEWALK CONNECTION, EAST GRANBY, CONNECTICUT
Land Surveying, Professional Engineering & Land Use Consultants
15 Research Drive
Suite 3
Woodbridge , CT  06525
P: (203) 881-8145
www.bbengrs.comE   N   G   I   N   E   E   R   I   N   G
DRAWING LIST
SHEET NUMBER
01-01
03-01 - 03-02
11-01 - 11-02
12-01 - 12-02
18-01 - 18-02
19-01 - 19-12
SITE ENGINEER
B&B ENGINEERING LLC
15 Research Drive
Suite 3
Woodbridge, Connecticut 06525
T: (203) 881-8145
DRAWING TITLE
COVER SHEET
EXISTING CONDITIONS PLANS
SITE LAYOUT PLANS
GRADING PLANS
SOIL EROSION AND SEDIMENT CONTROL PLANS
CONSTRUCTION NOTES & DETAILS
BOARD OF SELECTMEN
Eden Wimpfheimer, First Selectwoman
Nicole Sokolowski, Executive Assistant
Steven Hall, Selectman
Amanda Thompson, Selectman
TOWN OF EAST GRANBY
9 Center Street
East Granby, Connecticut 06026
P: (860)-653-2576
COMMUNITY CONNECTIVITY GRANT PROGRAM
PROJECT #0170-3513GR
GENERAL SURVEY NOTESGENERAL ENGINEERING NOTES
01-01
PLANNING & ZONING DEPARMENT
Robin Newton, AICP, CZEO
  Director of Planning & Economic Development

10000
10100
000
100
200
300
400
500
600
700
00
900
1000
1100
1111
MAP REFERENCES
GENERAL SURVEY NOTES
TOWN CAMPUS SIDEWALK CONNECTION, EAST GRANBY, CONNECTICUT
15 9060300
SCALE: 1"=30'
Land Surveying, Professional Engineering & Land Use Consultants
15 Research Drive
Suite 3
Woodbridge, CT  06525
P: (203) 881-8145
www.bbengrs.comE   N   G   I   N   E   E   R   I   N   G
OF
TOWN CAMPUS SIDEWALK
CONNECTIONS
PREPARED FOR
TOWN OF EAST GRANBY
9 CENTER STREET
EAST GRANBY, CONNECTICUT 06026
DRAWING LIST
03-01
EXISTING CONDITIONS
PLAN I
LEGEND
(
(
(
(
(
L:\Job Data\1400-1499\1419\Cadd Data\Sheet Set\1419 SHEET EX CONDITIONS.dwg, 2/7/2025 1:05:20 PM, ARCH full bleed D (36.00 x 24.00 Inches)

20000
20100
20200
20300
20400
20500
20600 20700 2000 20900 21000 21100
21200
21272
10000
10100
10200
10300
10400
10500
10536
700
00
900
1000
GENERAL SURVEY NOTES
MAP REFERENCES
TOWN CAMPUS SIDEWALK CONNECTION, EAST GRANBY, CONNECTICUT
15 9060300
SCALE: 1"=30'
Land Surveying, Professional Engineering & Land Use Consultants
15 Research Drive
Suite 3
Woodbridge, CT  06525
P: (203) 881-8145
www.bbengrs.comE   N   G   I   N   E   E   R   I   N   G
OF
TOWN CAMPUS SIDEWALK
CONNECTIONS
PREPARED FOR
TOWN OF EAST GRANBY
9 CENTER STREET
EAST GRANBY, CONNECTICUT 06026
DRAWING LIST
03-02
EXISTING CONDITIONS
PLAN II
LEGEND
(
(
(
(
(
L:\Job Data\1400-1499\1419\Cadd Data\Sheet Set\1419 SHEET EX CONDITIONS.dwg, 2/7/2025 1:05:29 PM, ARCH full bleed D (36.00 x 24.00 Inches)

CARL ALLGROVE SCHOOL
POST OFFICE
EAST GRANBY TOWN HALL
EAST GRANBY
COMMUNITY &
SENIOR CENTER
RETAIL
10000
10100
000
100
200
300
400
500
600
700
00
900
1000
1100
1111
GENERAL NOTES
TOWN CAMPUS SIDEWALK CONNECTION, EAST GRANBY, CONNECTICUT
15 9060300
SCALE: 1"=30'
Land Surveying, Professional Engineering & Land Use Consultants
15 Research Drive
Suite 3
Woodbridge, CT  06525
P: (203) 881-8145
www.bbengrs.comE   N   G   I   N   E   E   R   I   N   G
LEGEND
OF
TOWN CAMPUS SIDEWALK
CONNECTIONS
PREPARED FOR
TOWN OF EAST GRANBY
9 CENTER STREET
EAST GRANBY, CONNECTICUT 06026
DRAWING LIST
11-01
SITE DEVELOPMENT PLAN I
L:\Job Data\1400-1499\1419\Cadd Data\Sheet Set\1419 SHEET SDP.dwg, 2/7/2025 1:05:45 PM, ARCH full bleed D (36.00 x 24.00 Inches)

EAST GRANBY TOWN HALL
EAST GRANBY
COMMUNITY &
SENIOR CENTER
AMBULANCE STATION
EAST GRANBY TOWN HALL
EAST GRANBY
FIRE HOUSE/
POLICE DEPARTMENT
RETAIL
20000
20100
20200
20300
20400
20500
20600 20700 2000 20900 21000 21100
21200
21272
10000
10100
10200
10300
10400
10500
10536
00
900
1000
GENERAL NOTES
TOWN CAMPUS SIDEWALK CONNECTION, EAST GRANBY, CONNECTICUT
15 9060300
SCALE: 1"=30'
Land Surveying, Professional Engineering & Land Use Consultants
15 Research Drive
Suite 3
Woodbridge, CT  06525
P: (203) 881-8145
www.bbengrs.comE   N   G   I   N   E   E   R   I   N   G
LEGEND
OF
TOWN CAMPUS SIDEWALK
CONNECTIONS
PREPARED FOR
TOWN OF EAST GRANBY
9 CENTER STREET
EAST GRANBY, CONNECTICUT 06026
DRAWING LIST
11-02
SITE DEVELOPMENT PLAN II
L:\Job Data\1400-1499\1419\Cadd Data\Sheet Set\1419 SHEET SDP.dwg, 2/7/2025 1:05:54 PM, ARCH full bleed D (36.00 x 24.00 Inches)

CARL ALLGROVE SCHOOL
POST OFFICE
EAST GRANBY TOWN HALL
EAST GRANBY
COMMUNITY &
SENIOR CENTER
RETAIL
10000
10100
000
100
200
300
400
500
600
700
00
900
1000
1100
1111
GENERAL NOTES
TOWN CAMPUS SIDEWALK CONNECTION, EAST GRANBY, CONNECTICUT
15 9060300
SCALE: 1"=30'
Land Surveying, Professional Engineering & Land Use Consultants
15 Research Drive
Suite 3
Woodbridge, CT  06525
P: (203) 881-8145
www.bbengrs.comE   N   G   I   N   E   E   R   I   N   G
LEGEND
OF
TOWN CAMPUS SIDEWALK
CONNECTIONS
PREPARED FOR
TOWN OF EAST GRANBY
9 CENTER STREET
EAST GRANBY, CONNECTICUT 06026
DRAWING LIST
12-01
GRADING PLAN I

EAST GRANBY TOWN HALL
EAST GRANBY
COMMUNITY &
SENIOR CENTER
AMBULANCE STATION
EAST GRANBY TOWN HALL
EAST GRANBY
FIRE HOUSE/
POLICE DEPARTMENT
RETAIL
20000
20100
20200
20300
20400
20500
20600 20700 2000 20900 21000 21100
21200
21272
10000
10100
10200
10300
10400
10500
10536
00
900
1000
GENERAL NOTES
TOWN CAMPUS SIDEWALK CONNECTION, EAST GRANBY, CONNECTICUT
15 9060300
SCALE: 1"=30'
Land Surveying, Professional Engineering & Land Use Consultants
15 Research Drive
Suite 3
Woodbridge, CT  06525
P: (203) 881-8145
www.bbengrs.comE   N   G   I   N   E   E   R   I   N   G
LEGEND
OF
TOWN CAMPUS SIDEWALK
CONNECTIONS
PREPARED FOR
TOWN OF EAST GRANBY
9 CENTER STREET
EAST GRANBY, CONNECTICUT 06026
DRAWING LIST
12-02
GRADING PLAN II

LEGEND
CARL ALLGROVE SCHOOL
POST OFFICE
EAST GRANBY TOWN HALL
EAST GRANBY
COMMUNITY &
SENIOR CENTER
RETAIL
10000
10100
000
100
200
300
400
500
600
700
00
900
1000
1100
1111
GENERAL NOTES
TOWN CAMPUS SIDEWALK CONNECTION, EAST GRANBY, CONNECTICUT
15 9060300
SCALE: 1"=30'
Land Surveying, Professional Engineering & Land Use Consultants
15 Research Drive
Suite 3
Woodbridge, CT  06525
P: (203) 881-8145
www.bbengrs.comE   N   G   I   N   E   E   R   I   N   G
LEGEND
OF
TOWN CAMPUS SIDEWALK
CONNECTIONS
PREPARED FOR
TOWN OF EAST GRANBY
9 CENTER STREET
EAST GRANBY, CONNECTICUT 06026
DRAWING LIST
18-01
SOIL EROSION & SEDIMENT
CONTROL PLAN I

EAST GRANBY TOWN HALL
EAST GRANBY
COMMUNITY &
SENIOR CENTER
AMBULANCE STATION
EAST GRANBY TOWN HALL
EAST GRANBY
FIRE HOUSE/
POLICE DEPARTMENT
RETAIL
20000
20100
20200
20300
20400
20500
20600 20700 2000 20900 21000 21100
21200
21272
10000
10100
10200
10300
10400
10500
10536
700
00
900
1000
GENERAL NOTES
LEGEND
TOWN CAMPUS SIDEWALK CONNECTION, EAST GRANBY, CONNECTICUT
15 9060300
SCALE: 1"=30'
Land Surveying, Professional Engineering & Land Use Consultants
15 Research Drive
Suite 3
Woodbridge, CT  06525
P: (203) 881-8145
www.bbengrs.comE   N   G   I   N   E   E   R   I   N   G
LEGEND
OF
TOWN CAMPUS SIDEWALK
CONNECTIONS
PREPARED FOR
TOWN OF EAST GRANBY
9 CENTER STREET
EAST GRANBY, CONNECTICUT 06026
DRAWING LIST
18-02
SOIL EROSION & SEDIMENT
CONTROL PLAN II

INLET PROTECTION WITH SILTSACK
TEMPORARY SOIL STOCKPILE DETAIL SILT FENCE
REMOVE BURLAP
FROM TOP 1/3 OF
BALL OF ALL TREES &
SHRUBS
PLANTING BED DETAIL
CONCRETE SIDEWALK CONCRETE MONOLITHIC CURB & SIDEWALKSEDIMENTATION & SOIL EROSION SPECIFICATIONS
GENERAL NOTES
TOWN CAMPUS SIDEWALK CONNECTION, EAST GRANBY, CONNECTICUT
15 9060300
SCALE: 1"=30'
Land Surveying, Professional Engineering & Land Use Consultants
15 Research Drive
Suite 3
Woodbridge, CT  06525
P: (203) 881-8145
www.bbengrs.comE   N   G   I   N   E   E   R   I   N   G
OF
TOWN CAMPUS SIDEWALK
CONNECTIONS
PREPARED FOR
TOWN OF EAST GRANBY
9 CENTER STREET
EAST GRANBY, CONNECTICUT 06026
DRAWING LIST
19-01
CONSTRUCTION NOTES AND
DETAILS I

GENERAL NOTES:

1. SEE CONCRETE SIDEWALK RAMPS GUIDE SHEETS FOR PEDESTRIAN RAMPS TYPES.
2. ALL CURBING SHALL BE INSTALLED AS OTHER PRECAST OR CAST IN PLACE AS DIRECTED.

PEDESTRIAN ACCESS ROUTE

OVER A MANHOLE WITH GRATE

1. HORIZONTAL OPENINGS IN GRATES AND JOINTS MUST NOT BE MORE THAN 1/4 HOT.
2. ELONGATED OPENINGS IN GRATES MUST BE PLACED SO THAT THE LOAD DIMENSION IS PERPENDICULAR TO THE DIRECTION OF TRAVEL

5' PASSING SPACE FOR 4' WIDE SIDEWALK

PLAN

PASSING SPACES SHALL BE PROVIDED AT INTERVALS OF 200' MAXIMUM FOR SIDEWALKS LESS THAN 5' IN WIDTH

5' WIDE SIDEWALK

PLAN

VERTICAL SURFACE DISCONTINUITIES

VERTICAL SURFACE DISCONTINUITIES MUST BE DEVELOPED TO A HEIGHT HOT GREATER THAN 1/4 HOT. THE BEND MUST BE THE ENTIRE WIDTH OF THE DISCONTINUITY

5' PASSING SPACE FOR 4' WIDE SIDEWALK

SECTION

[tbl-0.md](tbl-0.md)

A2050 6/8 1/2010

[tbl-1.md](tbl-1.md)

[tbl-2.md](tbl-2.md)

TOWN OF CAMPFIELD, RIDGEWALK, CONNECTICUT, JOHN G. GRANBY, CONNECTICUT

BITUMINOUS CONCRETE DRIVEWAY

PLAN

ELEVATION

SECTION A

BITUMINOUS CONCRETE SIDEWALK

BITUMINOUS CONCRETE DRIVEWAY
WITH A PEDESTRIAN SIDEWALK SETBACK

PLAN

ELEVATION

SECTION B

BITUMINOUS CONCRETE DRIVEWAY

BITUMINOUS CONCRETE DRIVEWAY
WITH PEDESTRIAN SIDEWALK AT THE CURB

PLAN

ELEVATION

SECTION C

COMMERCIAL
BITUMINOUS CONCRETE DRIVEWAY

[tbl-0.md](tbl-0.md)

DRAWING NUMBER: 19-03

[tbl-1.md](tbl-1.md)

CONSTRUCTION NOTES AND

DETAILS III

TOWN CAMPUS SIDEWALK

CONNECTIONS

TOWN OF EAST GRANBY

9 CENTER STREET

EAST GRANBY, CONNECTICUT 06026

[tbl-2.md](tbl-2.md)

[tbl-3.md](tbl-3.md)

TOWN CAMPUS SIDEWALK CONNECTICUT, EAST GRANBY, CONNECTICUT

REVISIONS DESCRIPTION

TWO DIRECTIONAL PERPENDICULAR RAMP
WITH A GRADE BREAK TO BACK OF CURB OF 5' OR LESS
(TYPE 1)

TWO DIRECTIONAL PERPENDICULAR RAMP
WITH A GRADE BREAK
TO BACK OF CURB OF 5' OR LESS
WITH NON-WALKING SURFACE
(TYPE 3)

TWO DIRECTIONAL PERPENDICULAR RAMP
WITH GRADE BREAK TO BACK OF CURB GREATER THAN 5'
(TYPE 2)

TWO DIRECTIONAL PERPENDICULAR RAMP
WITH A GRADE BREAK
TO BACK OF CURB GREATER THAN 5'
WITH NON-WALKING SURFACE
(TYPE 4)

BLENDED TRANSITION
WITH TURNING SPACE AT TOP
(TYPE 5)

GENERAL NOTES:

1. SIDEWALK RAMPS SHALL HAVE A COARSE BECOM-RAIN TRANSVERSE TO THE SLOPE OF THE RAMS.
2. VERTICAL SURFACE DISCONTINUING AT JOINTS SHALL NOT EXCEED 1/4 INCH.
3. REMOVAL OF SIDEWALK SIDEWALK FOR NEW RAMP INSTALLATIONS SHALL BE TO THE NEAREST EXPANSION OR COMPACTION JOINT.
4. THE DRAWING SLOPE OF THE CURB RAMP SHALL BE CENTERED MAXIMUM BUT SHALL NOT REQUIRE THE RAMP UNLESS TO EXCEED 1/2 FEET.
5. DETECTABLE WARNING SURFACES SHALL BE INSTALLED ON SIDEWALK RAMPS AT PEDESTRIAN STREET CROSSING. PEDESTRIAN BRIDGE BLAKES AND BALBEGAS CROSSINGS ALONG DENSITUDE HIGHWAYS.
6. DETECTABLE WARNING SURFACES SHALL EXTEND LONG VAIN. IN THE DIRECTION OF PEDESTRIAN TRAVEL AND DRAIN THE ENTIRE RAMP OPENING.
7. ALL CASSIDYED VALVES COMPLY WITH PROHIBITED LIMITS OF CLASSIFIABLE DEVICES CALLED AND BE MADE TO COMPLY WITH PROHIBITED RAIL RULE ONCE OFFICIALLY THE LAW.
8. CYLIST DESIGN STANDARDS USE THE PUBLIC BODY OF ANY ACCESSIBILITY GUIDELINES, (REFUNDS) SEE ENGINEERING DIRECTOR 60-30-9.7.
9. CURB RAMPS SHALL BE CONSTRUCTED SO THAT WATER WILL NOT ACCULATE WITHIN THE PEDESTRIAN ACCESS ROUTE.

[tbl-0.md](tbl-0.md)

[tbl-1.md](tbl-1.md)

[tbl-2.md](tbl-2.md)

TOWN CAMPUS SIDEWALK CONNECTIONS, JOINT GRANDF, CONNECTICUT

PERPENDICULAR RAMP
WITH 48" BY-PASS
(TYPE 8)

PARALLEL RAMP WITH
TURNING SPACE CONSTRAINED
ON TWO (2) OR MORE SIDES
(TYPE 9)

GENERAL NOTES:

1. SIDEWALK RAMPS SHALL HAVE A COARSE BROOM FINISH TRANSVERSE TO THE SLOPE OF THE RAMP.
2. VERTICAL SURFACE DISCONFINDRIES AT JOINTS SHALL NOT EXCEED ¼ INCH.
3. REMOVAL OF EXISTING SIDEWALK FOR NEW RAMP INSTALLATIONS SHALL BE TO THE NEAREST EXPANSION OR CONTRACTION JOINT.
4. THE RUNNING SLOPE OF THE CURB RAMP SHALL BE 8.20 PERCENT MAXIMUM BUT SHALL NOT REQUIRE THE RAMP LENGTH TO EXCEED 15 FEET.
5. DETECTABLE WARNING SURFACES SHALL BE INSTALLED ON SIDEWALK RAMPS AT PEDESTRIAN STREET CROSSINGS, PEDESTRIAN REFUSE BLAKES AND RAILROAD CROSSINGS ALONG STREETS OR HIGHWAYS.
6. DETECTABLE WARNING SURFACES SHALL EXTEND 2 FEET MIN. IN THE DIRECTION OF PEDESTRIAN TRAVEL AND SPAN THE ENTIRE RAMP OPENING.
7. ALL OVEREXIST VALVES COMPLY WITH PROWAG GRANT 203 GUIDELINES. UPDATED VALVES WILL BE MADE TO COMPLY WITH PROWAG RINK RULE ONCE OFFICIALLY THE LAW.
8. CTOCE DESIGN STANDARD USE THE PUBLIC RIGHT-OF-WAY ACCESSIBILITY GUIDELINES (PROWAG) SEE ENGINEERING DIRECTIVE 05-2014.7.
9. CURB RAMPS SHALL BE CONSTRUCTED SO THAT WATER WILL NOT ACCUMULATE WITHIN THE PEDESTRIAN ACCESS ROUTE.

PARALLEL RAMP
WITH TURNING SPACE
CONSTRAINED ON ONE SIDE
(TYPE 10a)

PARALLEL RAMP
WITH TURNING SPACE
CONSTRAINED ON TWO (2) OR MORE SIDES
(TYPE 10b)

[tbl-0.md](tbl-0.md)

[tbl-1.md](tbl-1.md)

CONSTRUCTION NOTES AND
DETAILS V

TOWN CAMPUS SIDEWALK
CONNECTIONS

TOWN OF EAST GRANBY

9 CENTER STREET

EAST GRANBY, CONNECTICUT 06026

[tbl-2.md](tbl-2.md)

[tbl-3.md](tbl-3.md)

TOWN CAMPUS SIDEWALK CONNECTICUT, EAST GRANBY, CONNECTICUT 06026

REV. DATE REVISION DESCRIPTION

PERPENDICULAR RAMP WITH

NON-WALKING SURFACE

(TYPE 11)

PERPENDICULAR RAMP WITH SIDEWALK CURB

AND NON-WALKING SURFACE

(TYPE 12)

PERPENDICULAR RAMP

WITH NON-WALKING SURFACE

(TYPE 13)

GENERAL NOTES:

1. SIDEWALK RAMP SHALL HAVE A COARSE BROOM FINISH TRASH FREE TO THE SLOPE OF THE RAMP.
2. VERTICAL SURFACE DISCOMPATIBLE AT JOINTS SHALL NOT EXCEED 1/4 INCH.
3. REMOVAL OF EXISTING SIDEWALK FOR NEW RAMP INSTALLATIONS SHALL BE TO THE NEAREST EXPANSION OR CONSTRUCTION JOINT.
4. THE RUNNING SLOPE OF THE CURB RAMP SHALL BE 6.25 PERCENT MAXIMUM BUT SHALL NOT REQUIRE THE RAMP LENGTH TO EXCEED 12 FEET.
5. DETECTABLE WARNING SURFACES SHALL BE REPLACED ON SIDEWALK RAMPS AT PEDESTRIAN CABLE CROSSINGS, PEDESTRIAN BRIDGE GUARDS AND RAILROAD CROSSINGS ALONG STREETS ON HIGHWAYS.
6. DETECTABLE WARNING SURFACES SHALL EXTEND 3 FEET MAX. IN THE DIRECTION OF PEDESTRIAN TRAVEL AND UPON THE EXPIRE RAMP OPENING.
7. ALL SLIDESWIDE VALVES COMPLY WITH PROMISE GRANT 2013 GUIDELINES UPDATED VALUES WILL BE BASED TO COMPLY WITH PROMISE FINAL FIELD PRICE OFFICALLY PER LAW.
8. EFFECT DESIGN STANDARDS USE THE PUBLIC RIGHT-OF-WAY ACCESSIBILITY GUIDELINES (PROMISE SEE ENGINEERING DIRECTIVE 02-2014).
9. CURB RAMPS SHALL BE CONSTRUCTED SO THAT WATER WILL NOT ACCOLATE WITHIN THE PEDESTRIAN ACCESS ROUTE.

[tbl-0.md](tbl-0.md)

[tbl-1.md](tbl-1.md)

CONSTRUCTION NOTES AND

DETAILS VI

TOWN CAMPUS SIDEWALK

CONNECTIONS

DESIGNED FOR

TOWN OF EAST GRANBY

9 CENTER STREET

EAST GRANBY, CONNECTICUT 06026

[tbl-2.md](tbl-2.md)

[tbl-3.md](tbl-3.md)

TOWN CAMPUS SIDEWALK CONNECTIONS: EAST GRANBY, CONNECTICUT

TOWN CAMPUS SIDEWALK CONNECTIONS: EAST GRANBY, CONNECTICUT

SINGLE DIRECTION PERPENDICULAR RAMP
GRADE BREAK TO THE BACK OF CURB
GREATER THAN 5'
(TYPE 14)

SINGLE DIRECTION PERPENDICULAR RAMP
WITH GRADE BREAK TO THE BACK
OF CURB THAT IS 5' OR LESS
(TYPE 15)

SINGLE DIRECTION PERPENDICULAR RAMP
RETURN CURB WITH NON-WALKING SURFACE
(TYPE 16)

SINGLE DIRECTION PERPENDICULAR RAMP
NO CURB WITH NON-WALKING SURFACE
(TYPE 17)

GENERAL NOTES:

1. SIDEWALK RAMPS SHALL HAVE A COARSE BROOM FINISH TRANSVERSE TO THE SLOPE OF THE RAMP.
2. VERTICAL SURFACE DISCONTRUITIES AT JOINTS SHALL NOT EXCEED 1/4 INCH.
3. REMOVAL OF EXISTING SIDEWALK FOR NEW RAMP INSTALLATIONS SHALL BE TO THE NEAREST EXPANSION OR CONTRACTION JO

Only the beginning is shown here; the whole file is searchable. Open the PDF for the rest.

20250507111955711 · PDF, 1 page

Open the PDF download · town site copy

Text read from the scan by OCR (may contain errors)
RFP Town Campus Sidewalk Connections Project

East Granby Town Hall

May 6, 2025

1:00pm

|  COMPANY | BID  |
| --- | --- |
|  Pontes Construction LLC Northwindham, CT | $621,250.00  |
|  Detour Construction Ludlow, MA | $405,860.00  |
|  Mather Corporation Bloomfield | $598,000  |
|  Nunes Connecticut, Inc. | $533,125  |
|  Four Seasons Landscaping Inc. | $440,425  |
|  B&W Paving & Landscaping LLC | $599,055  |
Text of the post itself (1 paragraph)

1419 Addendum 1 EG Town Campus 2025 04 28 Download RFP Project Manual Published 1419 Town Campus Sidewalk Specification Download RFP 1419 Town Campus Sidewalk Connections Maps Full Set March 7 2025 Download 20250507111955711 Download

From the town's website: https://eastgranbyct.org/rfp-town-campus-sidewalk-connections-project/.