Landfill Solar 2025 RFP Results

East Granby town newsPosted Feb 26, 2025Town NewsOriginal post on the town site

Summary

AI-generated summary of the post and its attached file, checked against their text (dollar figures). Written Nov 22, 2026; the town may have updated the post since.

Titan Energy reviewed four proposals for solar development on the capped landfill at 205 Turkey Hill Road (East Granby) and recommends Greenskies Clean Energy as the development partner. The Town's next steps are reviewing results with Titan, executing a non-binding LOI with the developer, and deciding between the SCEF and Low-Emission NRES programs before the bid deadlines in March 2025.

  • Titan recommends Greenskies Clean Energy as the strongest, most buildable proposal; its design meets required wetland, floodplain, transmission line and emergency access setbacks.
  • Greenskies offers lease options: NRES high bid $205,000.00 Year-1 lease (4.632 MW DC, $44,257.34/MW), NRES low bid $179,375.00 Year-1, and SCEF $159,437.00 Year-1; each is fixed for 20 years.
  • Titan's analysis favors the Low-Emission NRES category over SCEF, but the Town may want to work with Titan and Greenskies to set an appropriate NRES bid-in rate.
  • The Greenskies LOI is explicitly non-binding; Greenskies also offers a right of first refusal for lawn and maintenance services, estimated at about $10,000/year in value to the Town, and a decommissioning bond.
  • Other bidders (Kearsage, Davis Hill, Verogy) were found to have design, setback, access or experience shortfalls, and Titan does not recommend them.

Dates mentioned: 2025-02-26: Titan to review results with Town officials (no later than); 2025-03-05: Town to execute non-binding LOI with developer; SCEF awards…; 2025-03-17: NRES bid deadline (no later than); 2027-06-01: Construction to begin (no later than); 2027-09-01: Construction complete (end of)

Attached files (1)

TitanGen-EG Landfill RFP Results · PDF, 15 pages

Open the PDF download · town site copy

Text read from the scan by OCR (may contain errors)
Solar Development Services

Landfill Solar 2025 RFP Results

TITAN ENERGY
Creative energy solutions

About Titan Energy
• Founded in 2001, Titan has over 20 years 
of energy industry experience
• Offers commodity procurement, demand-
side management, onsite generation 
services and data management, 
dashboarding, EV charging solutions and 
demand response
• Headquartered in Connecticut with a 
nationwide presence
• Commodity procurement coverage in all 
deregulated markets and other energy 
management services in all states
• ~10,500 commercial, industrial & 
municipal customers, encompassing 
~70,000 meters
• Proud CCM Energy Procurement Partner
Geographies Served
Key Stats
# of Customers: ~10,500
# of Meters Managed: ~70,000
Energy Spend Managed: $550 million


Process Overview
• An RFP was issued for solar development services for the capped landfill located at 205 Turkey Hill Road. 
• Proposals were received from Kearsage, Davis Hill Development, Verogy and Greenskies Clean Energy.
• The RFP instructed each bidder to formulate their proposals based on a series of distinct criteria so that bids can be 
evaluated on a like-for-like basis. 
• The RFP instructed bidders to assume their project would be eligible for both the Non-Residential Renewable Energy 
Solutions (NRES) and the Shared Clean Energy Facility (SCEF) program. 
• Both SCEF and NRES programs operate on a competitive bidding basis, whereby each developer offers to sell power to 
Eversource at a fixed price over a twenty-year period. The developers with the lowest price per kilowatt-hour are selected 
until the program capacity is full. NRES offers two bid periods (March and September), while SCEF has historically offered 
one, although if spare capacity remains after the first bid round, a second round will open in August.
• There are program-specific and site-specific reasons to favor SCEF or NRES. The Low-Emission NRES category has a 
higher potential clearing price than SCEF and tends to yield better lease rates for the landowner. SCEF has been 
undersubscribed as of late, but the program has a lower price cap which prevents a project from bidding as high as it could 
under NRES. SCEF also has more strict permitting requirements concerning slope. Both programs qualify for the 20% 
brownfield bid preference. 
• For the sake of bid comparison, Titan instructed developers to assume a specific high/low bid for NRES and single bid at the 
price cap for SCEF. The final decision regarding the project’s bid strategy should be finalized once a developer is selected.
• Titan has evaluated the bid responses for accuracy, completeness and feasibility, and has concluded that Greenskies is the 
ideal partner for East Granby.


4
Pricing & System Designs
Pricing Overview
Developer
System Size 
(MW DC) Lease Rate/MW Total Year-1 Value Lifetime Value
Davis Hill 4.31 $25,986.08 $112,000.00 $2,240,000.00
Verogy 1.02 $38,109.37 $38,915.00 $778,300.00
Kearsage 5.60 $37,777.62 $211,554.66 $4,279,022.11
Greenskies 4.63 $44,257.34 $205,000.00 $4,100,000.00

5
Verogy (NRES Medium Category)
System Size (MW 
DC)
Annual kWh 
Production Lease Rate/MW Total Year-1 Lease Lifetime Value
1.02114 1,343,446 $38,109.00 $38,915.00 $778,300.00
Verogy
• Verogy is a medium-sized solar developer based in 
West Hartford, Connecticut. 
• Their financial offer, stated above, is predicated on a 
NRES bid in the medium category, which is a 
deviation from the RFP instruction. The annual lease 
rate would be fixed for 20-years. 
• Verogy has solid Connecticut landfill development 
experience and is a capable group, in general. 
• Verogy has expressed concerns about the ambiguity 
of the easement around the powerlines that run 
through the property, and as such, opted for a 
smaller system that would compete in the “medium” 
NRES category (1 MW AC or less). We feel this is 
unnecessarily conservative, as there are options to 
expand upon the area without infringing on 
Eversource’s property. 


6
• Davis Hill is a small development outfit based in 
Stamford, Connecticut. 
• Their financial offer, stated above, is predicated on a 
SCEF bid at the program price cap, as required by the 
RFP. The annual lease rate would be fixed for 20-years. 
• Davis Hill has never developed a completed project of 
this size on a landfill in Connecticut. We feel this puts the 
company at a disadvantage because successful 
permitting with the Connecticut Siting Council and 
Department of Energy and Environmental Protection can 
ultimately hinge on relationships and prior working 
experience.
• In addition to a lack of experience, their design includes 
a section of array to the west that is placed over a 
portion of the land that is clearly wet, and they lack 
emergency access roads through the site. This will 
require the system be reduced by approximately 10%. 
Davis Hill Development
Davis Hill (SCEF)
System Size (MW 
DC)
Annual kWh 
Production Lease Rate/MW Total Year-1 Lease Lifetime Value
4.31 5,242,000 $25,986.08 $112,000.00 $2,240,000.00


7
Kearsage (NRES @ high bid)
System Size 
(MW DC)
Annual kWh 
Production Lease Rate/MW PILOT Payment
Bill Credits (13.5% 
disc.) Total Year-1 Value Lifetime Value
5.6 7,244,700 $9,700.00 $4,500.00 $132,034.66 $211,554.66 $4,279,022.11
Kearsage (NRES @ low bid)
System Size 
(MW DC)
Annual kWh 
Production Lease Rate/MW PILOT Payment
Bill Credits (13.5% 
disc.) Total Year-1 Value Lifetime Value
5.6 7,244,700 $6,000.00 $3,000.00 $120,298.24 $170,698.24 $3,407,993.55
• Kearsage is a medium-sized developer based in Boston. 
• Their financial offers, stated above, deviate from the RFP 
instruction and introduce a level of complexity that is not 
entirely necessary. They break their offer into an annual 
lease payment, a pilot payment and an offer to provide 
utility bill credits across Town/BOE Eversource accounts. 
• Kearsarge has developed landfills but only one project in 
Connecticut, which was not on a landfill. We feel this 
puts the company at a disadvantage because successful 
permitting with the Connecticut Siting Council and 
Department of Energy and Environmental Protection can 
ultimately hinge on relationships and prior working 
experience. 
Kearsage Solar


8
Kearsage Solar, Cont. 
• The yellow lines represent the 
code-required access paths. The 
Kearsage proposed design does 
not have sufficient access roads 
for emergency vehicles, which 
are a requirement for projects 
over 1 MW AC.
• The white circles represent 
wetland setbacks, and any panel 
within the setback zone would 
need to be removed.
•
• The black shaded area 
represents the required 
transmission line setback of 50’.
• The light blue area is a floodplain 
that needs a 100’ setback. 
• Taken together, the design will 
have to be reduced by 
approximately 15-20%. 
• The utility bill credits mentioned 
in the previous page need to be 
further discussed, as they add 
unnecessary complexity to the 
deal and cannot be fully 
absorbed/utilized by the Town. 
Titan Image

9
Greenskies Clean Energy
• Greenskies Clean Energy is a large 
renewable energy development 
group based in North Haven.
• They are offering options based on 
the NRES and SCEF programs. The 
annual lease rate would be fixed for 
20-years in all cases.  
• Greenskies has solid Connecticut 
landfill development experience and 
has developed the largest single 
project in Connecticut (Waterford).
• Greenskies also has significant 
experience developing capped 
landfill projects in Cape Cod and 
Martha’s Vineyard, where wetlands 
and watershed considerations are of 
utmost importance. Titan recognizes 
this is of importance to East Granby. 
Greenskies (NRES @ High bid)
System Size 
(MW DC)
Annual kWh 
Production Lease Rate/MW
Total Year-1 
Lease Lifetime Value
4.632 4,993,200 $44,257.34 $205,000.00 $4,100,000.00
Greenskies (NRES @ Low bid)
System Size 
(MW DC)
Annual kWh 
Production Lease Rate/MW
Total Year-1 
Lease Lifetime Value
4.632 4,993,200 $38,725.17 $179,375.00 $3,587,500.00
Greenskies; SCEF
System Size 
(MW DC)
Annual kWh 
Production Lease Rate/MW
Total Year-1 
Lease Lifetime Value
4.632 4,993,200 $34,420.77 $159,437.00 $3,188,740.00


10
• The system is designed 
to code and does not 
encroach on wetlands. 
• Greenskies is offering the 
right of first refusal to the 
Town for lawn and 
maintenance services. 
We expect that to yield 
an additional 
$10,000/year in financial 
value for the Town.
• Greenskies is offering a 
system decommissioning 
bond. 
• The LOI provided by 
Greenskies specifically 
states that it is non-
binding in nature. 
Greenskies Clean Energy, Cont. 


Bidder Summary
Criteria Kearsarge Greenskies Verogy Davis Hill
Program 
Selection
Kearsarge elected to use only 
the Zero Emission NRES 
category, which represents 
high risk, in our view. Low 
Emission and SCEF are the 
best avenues for this project.
Greenskies proposes to utilize 
the SCEF and Low-Emission 
NRES program for their 
submission.
Verogy has proposed the 
Medium NRES category for 
their project submission. 
Davis Hill as proposed using the 
SCEF program only. 
System 
Design
The system design lacks 
required setbacks around 
floodplains, wetlands, utility 
lines and emergency access 
roads.
The system design takes into 
account all required setbacks 
and points of access. 
Verogy has designed a 
system that we feel is too 
conservative in its approach 
and leaves untapped value 
on the table for East Granby.
Davis Hill has proposed building a 
section of the array over a 
mapped wetland. This 
demonstrates a lack of attention 
to detail. They also lack 
necessary access paths. 
Strength of 
Offer
The offer is nominally strong, 
but the project is overdesigned 
and needs to be reduced by 
approximately 15-20%. 
The offers are strong and based 
on a buildable design.
The lease rate is strong but 
the project size is too 
conservative. 
The offer is the weakest of the 
group.
Development 
Experience
Kearsage is primarily 
experienced in Massachusetts. 
They've developed only one 
Connecticut project on a 
greenfield.
Greenskies has developed 
multiple Connecticut landfills 
and others in New England. 
They are a preferred provider to 
Walmart, Amazon and Target.
Verogy has noteworthy 
development experience in 
Connecticut on landfills and 
privately help companies.
Davis Hill has never developed a 
capped landfill in Connecticut, 
which puts them at a 
disadvantage in this instance. 
Company 
Profile
Kearsarge is a privately held, 
Boston-based development 
company that builds and owns 
projects. The company 
currently employs 22 
individuals.
Greenskies is a Connecticut-
based development and asset 
ownership entity, backed by a 
multi-billion-dollar infrastructure 
fund and the AllState Insurance 
Company. Greenskies employs 
approximately 100 individuals.
Verogy is a privately held 
company in partnership with 
a private equity group.
Davis Hill is a privately help 
company and is the smallest outfit 
of the group.

Conclusions
• It is the opinion of TitanGen that Greenskies Clean Energy has delivered the strongest, most accurate proposal of the group. 
Their system design was the most advantageous for East Granby and does not require significant revision, as other 
proposals do. Their degree of experience with landfills (in Connecticut and beyond) offers a sense of comfort in their ability 
to work with the CT Siting Council and DEEP to successfully obtain construction permits for the project. 
• Greenskies has secured 38% of all NRES awards granted under the program since 2022– the single largest share of any 
developer. The ability to win in NRES (or SCEF) is crucial to this effort. 
• Assuming the Town chooses Greenskies as it’s development partner, the next decision should be between SCEF and 
NRES. Titan is of the opinion that the Low Emission NRES category is the most advantageous for East Granby.
• NRES has a higher price cap than SCEF, which allows projects to bid higher and receive more income over time.
• NRES does not have strict slope requirements like SCEF does.
• NRES bids are due March 17th, compared to March 5th for SCEF.
• NRES has two guaranteed bid-in periods per year, SCEF only has one guaranteed bid-in period
• The primary disadvantage of NRES is that it is a more competitive program than SCEF. The Town may want to consider 
working with Titan and Greenskies to determine the appropriate NRES bid-in rate that will both ensure success and create a 
meaningful financial outcome from the process. 
• The second disadvantage is that NRES projects with kWh output that exceed the host Town’s kWh use must bring in 
another municipality to close the gap. Titan can assist here with very little impact on the project overall. 


1
• Titan to review results with Town officials
• No later than 2-26-25
2
• Town to execute non-binding LOI with developer
• No later than 3-5-25
3
• Developer to submit for Eversource awards
• No later than 3-5-25 (SCEF) or 3-17-25 (NRES)
4
• Construction to Begin
• No later than 6-1-27
5
• Construction Complete
• End of 9-1-2027
Process Timeline


SCEF Bid History
Titan RFP recommended bid - $133 
(nominal), $106.40 (evaluated) 
$95.00 
$89.76 $89.90 
$107.90 
$132.96 
$80.50 
$75.99 
$82.00 
$84.75 
$103.90 
 $60.00
 $70.00
 $80.00
 $90.00
 $100.00
 $110.00
 $120.00
 $130.00
 $140.00
Year-1 Year-2 Year-3 Year-4 Year-5
High/Low Bid (Evaluated)
High Bid Low Bid


NRES Low-Emission Bid History
Titan RFP recommended bid – $150/140 
(nominal), $120/$112 (evaluated) 
$205.94
$158.00
$119.59$119.50
$112.80
$105.00
$60.00
$80.00
$100.00
$120.00
$140.00
$160.00
$180.00
$200.00
$220.00
1/1/2022 1/1/2023 1/1/2024
High/Low Bid (Evaluated)
High Bid Low Bid
Text of the post itself (1 paragraph)