BETA Group, Inc. presented slides on East Granby's sewer system evaluation, covering infiltration/inflow (I/I) analysis and a planned spring 2025 flow monitoring study of the existing sanitary sewer system. The work is a phased, state-regulated process that will identify areas needing further investigation.
- Phase 1 (I/I Analysis) is a flow monitoring study of the existing sanitary sewer system, scheduled for spring 2025, evaluated in smaller sub-areas.
- Flow meters will be placed where they provide consistent data, with a goal of capturing a significant rain event.
- Areas with excessive I/I are identified by comparing dry weather flow to wet weather flow (inflow) and dry weather flow to water consumption data (infiltration).
- A Summary Report of findings will be prepared and submitted to DEEP, recommending further investigation where needed (CCTV, smoke testing, flow isolation).
- Phase 2 (SSES) would then locate I/I sources, evaluate rehabilitation methods with cost analysis, and recommend mitigation plans; sewer rehabilitation and follow-up metering are future steps.
Dates mentioned: January 22, 2025 (presentation date); Spring 2025 (flow monitoring study); Post dated January 24, 2025
Attached files (1)
BETA Group, Inc. - East Granby, CT - SSES Slides · PDF, 10 pages
Open the PDF download · town site copy
Text read from the scan by OCR (may contain errors)
Infiltration / Inflow Analysis East Granby, CT January 22, 2025 BETA Sewer System Evaluation Regulatory Approved Approach I/I Analysis (Phase 1) •Identify portions of system subject to I/I through flow metering of sewersheds •Recommend areas for additional investigations to identify sources SSES (Phase 2) •Conduct additional investigations to locate and identify I/I sources •Evaluate rehabilitation methods and complete a cost analysis •Recommend plans for mitigation Sewer Rehabilitation (Future) •Implement plans to mitigate infiltration sources •Implement plans to mitigate inflow sources Follow-up Analysis (Future) •Conduct metering to verify I/I removal •Implement plans to mitigate inflow sources Infiltration ▪ Groundwater that enters the sewer collection system o Faulty Pipe Joints o Cracks in pipe o Structurally impaired sewer manholes Structurally Sound Pipe Cracks in Pipe Offset Joint Inflow ▪ Stormwater (rainwater) that enters the sewer collection system o Illicit Connections • Sump Pumps • Drainage Infrastructure • Roof Leaders o Sewer Manhole Covers Damaged Sewer Manhole Cover Sump Pump Discharge to Sewer East Granby – Existing Sewer Collection System BETA Phase 1 - I/I Analysis o Complete Flow Monitoring Study of existing Sanitary Sewer System (Spring of 2025) • Evaluate sewer system in smaller segments (sub-areas) • Flow Monitoring Goals ➢ Install flow meters in locations that will provide consistent data ➢ Capture a significant rain event Flow Monitoring Study (Phase 1) BETA Phase 1 - I/I Analysis Cont’ o Evaluate data • Identify areas with excessive Infiltration / Inflow ➢ Comparing dry weather flow to wet weather flow = Inflow ➢ Comparing dry weather flow to water consumption data = Infiltration o Prepare Summary Report ▪ Summarizes findings from the data ▪ Develop plan to target areas for further investigation (if necessary) ➢ Further investigation: CCTV, Smoke Testing, Flow Isolation (metering) ▪ Summary Report to be submitted to DEEP Figure 6.13.1 Sanitary Flows on Addy Drive culdesac Bristol, RI Manhole ID# 24-124 February 13, 2008 Rain Event BETA Questions?
Text of the post itself (1 paragraph)
BETA Group, Inc. – East Granby, CT – SSES Slides Download
From the town's website: https://eastgranbyct.org/beta-group-inc-sewer-presentation/.