East Granby town newsPosted Jan 24, 2025Town NewsOriginal post on the town site

Summary

AI-generated summary of the post and its attached file, checked against their text (dollar figures). Written Nov 22, 2026; the town may have updated the post since.

BETA Group, Inc. presented slides on East Granby's sewer system evaluation, covering infiltration/inflow (I/I) analysis and a planned spring 2025 flow monitoring study of the existing sanitary sewer system. The work is a phased, state-regulated process that will identify areas needing further investigation.

  • Phase 1 (I/I Analysis) is a flow monitoring study of the existing sanitary sewer system, scheduled for spring 2025, evaluated in smaller sub-areas.
  • Flow meters will be placed where they provide consistent data, with a goal of capturing a significant rain event.
  • Areas with excessive I/I are identified by comparing dry weather flow to wet weather flow (inflow) and dry weather flow to water consumption data (infiltration).
  • A Summary Report of findings will be prepared and submitted to DEEP, recommending further investigation where needed (CCTV, smoke testing, flow isolation).
  • Phase 2 (SSES) would then locate I/I sources, evaluate rehabilitation methods with cost analysis, and recommend mitigation plans; sewer rehabilitation and follow-up metering are future steps.

Dates mentioned: January 22, 2025 (presentation date); Spring 2025 (flow monitoring study); Post dated January 24, 2025

Attached files (1)

BETA Group, Inc. - East Granby, CT - SSES Slides · PDF, 10 pages

Open the PDF download · town site copy

Text read from the scan by OCR (may contain errors)
Infiltration / Inflow Analysis

East Granby, CT

January 22, 2025

BETA

Sewer System Evaluation
Regulatory Approved Approach 
I/I Analysis 
(Phase 1)
•Identify portions of system subject to I/I through flow metering of sewersheds
•Recommend areas for additional investigations to identify sources
SSES
 (Phase 2)
•Conduct additional investigations to locate and identify I/I sources
•Evaluate rehabilitation methods and complete a cost analysis
•Recommend plans for mitigation 
Sewer 
Rehabilitation
(Future)
•Implement plans to mitigate infiltration sources 
•Implement plans to mitigate inflow sources
Follow-up 
Analysis
(Future)
•Conduct metering to verify I/I removal
•Implement plans to mitigate inflow sources

Infiltration
▪ Groundwater that enters the sewer collection system
o Faulty Pipe Joints
o Cracks in pipe
o Structurally impaired sewer manholes
Structurally Sound Pipe Cracks in Pipe Offset Joint


Inflow
▪ Stormwater (rainwater) that enters the sewer collection system
o Illicit Connections 
• Sump Pumps 
• Drainage Infrastructure 
• Roof Leaders
o Sewer Manhole Covers
Damaged Sewer 
Manhole Cover
Sump Pump 
Discharge to Sewer

East Granby – Existing Sewer Collection System

BETA

Phase 1 - I/I Analysis
o Complete Flow Monitoring Study of existing Sanitary Sewer System (Spring of 2025)
• Evaluate sewer system in smaller segments (sub-areas)
• Flow Monitoring Goals 
➢ Install flow meters in locations that will provide consistent data 
➢ Capture a significant rain event 

Flow Monitoring Study (Phase 1)

BETA

Phase 1 - I/I Analysis Cont’
o Evaluate data 
• Identify areas with excessive Infiltration / Inflow 
➢ Comparing dry weather flow to wet weather flow = Inflow 
➢ Comparing dry weather flow to water consumption data = Infiltration 
o Prepare Summary Report 
▪ Summarizes findings from the data
▪ Develop plan to target areas for further investigation (if necessary) 
➢ Further investigation: CCTV, Smoke Testing, Flow Isolation (metering)
▪ Summary Report to be submitted to DEEP

Figure 6.13.1

Sanitary Flows on Addy Drive culdesac

Bristol, RI Manhole ID# 24-124

February 13, 2008 Rain Event

BETA

Questions?
Text of the post itself (1 paragraph)

BETA Group, Inc. – East Granby, CT – SSES Slides Download

From the town's website: https://eastgranbyct.org/beta-group-inc-sewer-presentation/.