East Granby / News / Apr 28, 2026
2025 MS4 General Permit 2025 Annual Report
East Granby news Hide agendas that already have minutes Town newsSummary
AI-generated summary of the post and its attached file, checked against their text (dollar figures). Written Nov 22, 2026; the town may have updated the post since.
The Town of East Granby posted its 2025 Annual Report under the CT DEEP 2017 MS4 General Permit (Permit GSM000089), covering January 1 to December 31, 2025. It summarizes the town's stormwater program progress (public education, IDDE, construction runoff, post-construction management, and pollution prevention) for residents and permit compliance.
- Report covers January 1, 2025 through December 31, 2025, prepared by CMG Environmental for the Town (dated February 2026).
- The town's Stormwater Management Plan and all Annual Reports are posted on the Town website and available in the Land Use Department; the MS4 General Permit is also available there.
- A draft Illicit Discharge Detection and Elimination (IDDE) program has been provided to the Town for review; once finalized it will be posted to the website.
- The town had 163 estimated MS4 outfalls; dry weather screenings were completed at 48 High and Low priority outfalls, with about 30% of the MS4 catchment area investigated.
- 367 cars participated in the regional MDC Household Hazardous Waste Collection Day; no citizen reports of suspected illicit discharges were received in 2025.
Dates mentioned: February 2026 (report date); January 1, 2025 to December 31, 2025 (reporting period); February 15, 2025 (annual report due date); March 2, 2025 (annual report posted)
Attached files (1)
Town of East Granby MS4 General Permit 2025 Annual Report · PDF, 25 pages
Open the PDF download · town site copy
Text of the file
ENVIRONMENTAL SERVICES ENGINEERING SERVICES 67 HALL ROAD PHONE (774) 241-0901 STURBRIDGE, MA 01566 FAX (774) 241-0906 2025 ANNUAL REPORT TOWN OF EAST GRANBY 9 CENTER STREET EAST GRANBY, CONNECTICUT 2017 MS4 GENERAL PERMIT EXISTING PERMITTEE PERMIT NUMBER GSM000089 FEBRUARY 2026 PREPARED FOR: TOWN OF EAST GRANBY 9 CENTER STREET EAST GRANBY, CONNECTICUT 06026 PREPARED BY: CMG ENVIRONMENTAL, INC. CMG ID 2025-189 2025 ANNUAL REPORT CMG ID 2025-189 TOWN OF EAST GRANBY FEBRUARY 2026 - Page 1 - Introduction This Annual Report has been prepared for the Town of East Granby in compliance with the Connecticut Department of Energy & Environmental Protection (CT DEEP) General Permit for the Discharge of Stormwater from Small Municipal Separate Storm Sewer Systems (MS4) (MS4 General Permit), effective July 1, 2017. This report documents the efforts of the Town of East Granby to comply with the conditions of the MS4 General Permit to the maximum extent practicable (MEP) for the period of January 1, 2025 to December 31, 2025. The 2025 Annual Report for the Town of East Granby is presented on the following pages. As a note, under Status in each BMP Summary table, “In progress” means the BMP has yet to be completed, and “Ongoing” means the BMP has been completed and upkeep/maintenance of it continues. 2025 ANNUAL REPORT CMG ID 2025-189 TOWN OF EAST GRANBY FEBRUARY 2026 - Page 2 - Part I: Summary of Minimum Control Measure Activities 1. PUBLIC EDUCATION AND OUTREACH (Section 6 (a)(1) / page 19) 1.1 BMP SUMMARY BMP Status Activities in current reporting period Measurable goal Department responsible Due Completion date Additional details 1-1 Implement public education and outreach Ongoing None SWMP posted to website Planning & Zoning Start by July 1, 2017 Ongoing Stormwater Management Plan and all Annual Reports have been posted on the Town website and are available in the Land Use Department. The MS4 General Permit is also available 1-2 Address education/outreach for pollutants of concern Ongoing None SWMP posted to website Planning & Zoning Start by July 1, 2017 Ongoing Info regarding IDDE program will be posted to website 1.2 DESCRIBE ANY PUBLIC EDUCATION AND OUTREACH ACTIVITIES PLANNED FOR THE NEXT YEAR, IF APPLICABLE. Town website will be further updated to include the following info: • Links to EPA Stormwater Discharges from Municipal Sources website and the UConn NEMO Connecticut MS4 Guide. • A draft IDDE Program has been provided to the Town for review. Once complete, it will be posted to the Town website and a banner indicating new info will be added. • Link to current Annual Report 2025 ANNUAL REPORT CMG ID 2025-189 TOWN OF EAST GRANBY FEBRUARY 2026 - Page 3 - 1.3 DETAILS OF ACTIVITIES IMPLEMENTED TO EDUCATE THE COMMUNITY ON STORMWATER Program Element/Activity Audience (and number of people reached) Topic(s) covered Pollutant of Concern addressed (if applicable) Responsible dept. or partner org. Printed info available in Land Use Department at Town Hall and online on the Engineering Department web page. General public Stormwater pollution prevention and waste minimization NA Planning & Zoning Town website has mapping including natural and cultural resources which includes water resources, water quality, water-sheds, LID suitability, etc.; stormwater management and sewer mapping. General public Stormwater management NA Planning & Zoning Town ordinances, zoning and subdivision regulations to detail how to get approval for stormwater management systems for new commercial and residential development are posted on Town website. General public, developers Stormwater management NA Planning & Zoning LID Design Manual and LID Educational Booklet detailing BMPs for stormwater management posted on Town website. General public, developers Stormwater management NA Planning & Zoning 2025 ANNUAL REPORT CMG ID 2025-189 TOWN OF EAST GRANBY FEBRUARY 2026 - Page 4 - 2. PUBLIC INVOLVEMENT/PARTICIPATION (Section 6(a)(2) / page 21) 2.1 BMP SUMMARY BMP Status Activities in current reporting period Measurable goal Department responsible Due Completion date Additional details 2-1 Comply with public notice requirements for the Stormwater Management Plan Complete None SWMP posted to website Planning & Zoning April 3, 2017 April 3, 2017 Stormwater Management Plan has been posted on Town website 2-1 Comply with public notice requirements for Annual Reports Ongoing Annual Report has been posted on Town website Annual Report posted to website Planning & Zoning Feb. 15, 2025 March 2, 2025 After posting, a banner was added to website indicating new info. Past Annual Reports are posted on Town website 2-2 Promote community stormwater management efforts Ongoing Local Boy Scouts troops, East Granby Land Trust and local citizens conducted cleanup activities Events conducted annually Planning & Zoning Start by July 1, 2017 Ongoing None 2-2 Promote community clean-up Ongoing Town received funds from State due to surcharge on miniature alcohol beverage containers, i.e., nips, that were used to offset costs to operate the Town recycling center Litter removed Public Works None Ongoing None 2.2 DESCRIBE ANY PUBLIC INVOLVEMENT/PARTICIPATION ACTIVITIES PLANNED FOR THE NEXT YEAR, IF APPLICABLE. Continuation of community stormwater management efforts listed above. 2025 ANNUAL REPORT CMG ID 2025-189 TOWN OF EAST GRANBY FEBRUARY 2026 - Page 5 - 2.3 PUBLIC INVOLVEMENT/PARTICIPATION REPORTING METRICS Metrics Implemented Date Posted Availability of the Stormwater Management Plan announced to public Yes April 15, 2017 Town website Availability of Annual Report announced to public Yes April 22, 2025 Town website 2025 ANNUAL REPORT CMG ID 2025-189 TOWN OF EAST GRANBY FEBRUARY 2026 - Page 6 - 3. ILLICIT DISCHARGE DETECTION AND ELIMINATION (Section 6(a)(3) and Appendix B / page 22) 3.1 BMP SUMMARY BMP Status Activities in current reporting period Measurable goal Department responsible Due Completion date Additional details 3-1 Develop written IDDE program In progress A draft IDDE Program has been provided to the Town for review Develop written IDDE program Planning & Zoning July 1, 2018 In progress Once complete, the Program will be posted to the Town website with a banner indicating new info added 3-2 Develop list and maps of all MS4 stormwater outfalls in priority areas Complete None Develop list and map Planning & Zoning July 1, 2020 Dec. 10, 2017 Map of Priority Areas has been developed using NEMO MS4 mapping tool 3-3 Implement citizen reporting program Ongoing The Town maintains a phone log to record citizen calls regarding stormwater management issues or suspected illicit discharges. Public Works investigates suspected illicit discharges Citizen reports logged and investigated Public Works July 1, 2018 July 1, 2017 Engineering Department web- page has stormwater info and contact info for Town Engineer. Town website has “Email Service Requests” that are directed to First Selectman. 3-4 Establish legal authority to prohibit illicit discharges Complete Ordinance enforcement Illicit discharges investigated and remediated Planning & Zoning July 1, 2018 July 1, 2018 None 3-5 Develop record keeping system for IDDE tracking Complete Systems in place and functioning properly Illicit discharges investigated, logged, tracked and remediated Planning & Zoning July 1, 2018 July 1, 2017 See 3-3 above 3-6 Address IDDE in areas with pollutants of concern Ongoing IDDE complaints investigated, logged and tracked Illicit discharges investigated, logged, tracked and remediated Planning & Zoning; Engineering; Public Works Start by July 1, 2017 Ongoing None 3-7 Household hazardous waste collection Ongoing Participation in MDC Household Hazardous Waste Collection Day with partner towns Household hazardous waste collected and recycled/ disposed Planning & Zoning Annually Annually 367 cars participated 2025 ANNUAL REPORT CMG ID 2025-189 TOWN OF EAST GRANBY FEBRUARY 2026 - Page 7 - 3.2 DESCRIBE ANY IDDE ACTIVITIES PLANNED FOR THE NEXT YEAR, IF APPLICABLE. A draft of the written IDDE program has been sent to the Town for review. Following completion, it will be posted to the Town website. The written IDDE program will be updated as needed throughout the term of the General Permit. A master IDDE tracking spreadsheet will be maintained, and all employees involved in the IDDE program will be trained regarding the logging process. 3.3 LIST OF CITIZEN REPORTS OF SUSPECTED ILLICIT DISCHARGES RECEIVED DURING THIS REPORTING PERIOD. Date of Report Location / suspected source Response taken None received. 3.4 PROVIDE A RECORD OF ILLICIT DISCHARGES OCCURRING DURING THE REPORTING PERIOD AND SSOS OCCURRING JULY 2012 THROUGH END OF REPORTING PERIOD USING THE FOLLOWING TABLE. Location (Lat long/ street crossing /address and receiving water) Date and duration of occurrence Discharge to MS4 or surface water Estimated volume discharged Known or suspected cause / Responsible party Corrective measures planned and completed (include dates) Sampling data (if applicable) None 3.5 BRIEFLY DESCRIBE THE METHOD USED TO TRACK ILLICIT DISCHARGE REPORTS, RESPONSES TO THOSE REPORTS AND WHO WAS RESPONSIBLE FOR TRACKING THIS INFORMATION. Reports of illicit discharges are received and investigated by the Department of Public Works. 2025 ANNUAL REPORT CMG ID 2025-189 TOWN OF EAST GRANBY FEBRUARY 2026 - Page 8 - 3.6 PROVIDE A SUMMARY OF ACTIONS TAKEN TO ADDRESS SEPTIC FAILURES USING THE TABLE BELOW. Location and nature of structure with failing septic systems Actions taken to respond to and address the failures Impacted waterbody or watershed, if known 43 Country Club Lane New tank installed Stony Brook 9 Larch Drive New tank installed Stony Brook 24 Miller Road New tank installed Farmington River 80 Old County Road New tank installed Farmington River 49 Seymour Road Full system (tank and fields) installed Farmington River 7 Southwood Lane Full system (tank and fields) installed Farmington River 129 Spoonville Road New tank installed Farmington River 32 Wynding Hills Road Full system (tank and fields) installed Farmington River 45 Wynding Hills Road New tank installed Farmington River 3.7 IDDE REPORTING METRICS Metrics Estimated or actual number of MS4 outfalls 163 Estimated or actual number of interconnections Unknown Outfall mapping complete 100% Interconnection mapping complete 100% System-wide mapping complete (detailed MS4 infrastructure) 100% Outfall assessment and priority ranking 100% Dry weather screenings of all High and Low priority outfalls complete 48 Catchment investigations complete 0 Estimated percentage of MS4 catchment area investigated 30% 2025 ANNUAL REPORT CMG ID 2025-189 TOWN OF EAST GRANBY FEBRUARY 2026 - Page 9 - 3.8 BRIEFLY DESCRIBE THE IDDE TRAINING FOR EMPLOYEES INVOLVED IN CARRYING OUT IDDE TASKS INCLUDING WHAT TYPE OF TRAINING IS PROVIDED AND HOW OFTEN IS IT GIVEN (MINIMUM ONCE PER YEAR). Annual training of Department of Public Works employees on the following topics: • MS4 General Permit • SWMP and who has responsibility for implementation • Discussion of IDDE, Post-Construction SW Management and Pollution Prevention / Good Housekeeping MCMs and what Town is required to do under each 2025 ANNUAL REPORT CMG ID 2025-189 TOWN OF EAST GRANBY FEBRUARY 2026 - Page 10 - 4. CONSTRUCTION SITE RUNOFF CONTROL (Section 6(a)(4) / page 25) 4.1 BMP SUMMARY BMP Status Activities in current reporting period Measurable goal Department responsible Due Completion date Additional details 4-1 Implement, upgrade and enforce land use regulations or other legal authority to meet requirements of MS4 General Permit Ongoing Inspection of construction sites Regulations enforcement Planning & Zoning; Engineering July 1, 2019 Subdivision regs last updated in 2012; wetland regs developed in 2012; zoning regs last updated in 2016; POCD developed in 2016 None 4-2 Develop/implement plan for interdepartmental coordination in site plan review and approval Ongoing Planning & Zoning and Building Depts., Farmington Valley Health District, Town Engineer, Fire Marshal and traffic authority involved in review, permitting and approval of land disturbance projects as necessary Continued inter- departmental site plan review and approval Planning & Zoning Start by July 1, 2017 Ongoing None 4-3 Review site plans for stormwater quality concerns Ongoing Town conducts plan reviews and inspections of projects disturbing 1 or more acres Continued review of site plans for stormwater quality concerns Planning & Zoning; Engineering Start by July 1, 2017 Ongoing Site inspections are to assess adequacy of installation, maintenance, operation and repair of construction and post- construction control measures 4-4 Conduct site inspections Ongoing Inspection of construction sites and issuance of notices of violation or stop work orders Inspections conducted Planning & Zoning; Engineering Start by July 1, 2017 Ongoing None 2025 ANNUAL REPORT CMG ID 2025-189 TOWN OF EAST GRANBY FEBRUARY 2026 - Page 11 - BMP Status Activities in current reporting period Measurable goal Department responsible Due Completion date Additional details 4-5 Implement procedure to allow public comment on site development Ongoing Hearings and/or public hearings with local land use commissions Public comment solicited and received Planning & Zoning Start by July 1, 2017 Ongoing None 4-6 Implement procedure to notify developers about DEEP Construction Stormwater General Permit Ongoing Developers and contractors notified of regulation if projects disturbing 1 or more acres Continued notification of developers of regulation Planning & Zoning Start by July 1, 2017 Ongoing Developers and contractors are notified informally as needed during pre-application meetings with Town Engineer 4.2 DESCRIBE ANY CONSTRUCTION SITE RUNOFF CONTROL ACTIVITIES PLANNED FOR THE NEXT YEAR, IF APPLICABLE. None other than continuation of those listed above. 2025 ANNUAL REPORT CMG ID 2025-189 TOWN OF EAST GRANBY FEBRUARY 2026 - Page 12 - 5. POST-CONSTRUCTION STORMWATER MANAGEMENT (Section 6(a)(5) / page 27) 5.1 BMP SUMMARY BMP Status Activities in current reporting period Measurable goal Department responsible Due Completion date Additional details 5-1 Establish and/or update legal authority
Only the beginning is shown here; the whole file is searchable. Open the PDF for the rest.
Text of the post itself (1 paragraph)
Town of East Granby MS4 General Permit 2025 Annual Report Download
From the town's website: https://eastgranbyct.org/2025-ms4-general-permit-2025-annual-report/.