CT Public Docs Tracker

East Granby / News / Apr 28, 2026

2025 MS4 General Permit 2025 Annual Report

East Granby town newsPosted Apr 28, 2026Town NewsOriginal post on the town site

Summary

AI-generated summary of the post and its attached file, checked against their text (dollar figures). Written Nov 22, 2026; the town may have updated the post since.

The Town of East Granby posted its 2025 Annual Report under the CT DEEP 2017 MS4 General Permit (Permit GSM000089), covering January 1 to December 31, 2025. It summarizes the town's stormwater program progress (public education, IDDE, construction runoff, post-construction management, and pollution prevention) for residents and permit compliance.

  • Report covers January 1, 2025 through December 31, 2025, prepared by CMG Environmental for the Town (dated February 2026).
  • The town's Stormwater Management Plan and all Annual Reports are posted on the Town website and available in the Land Use Department; the MS4 General Permit is also available there.
  • A draft Illicit Discharge Detection and Elimination (IDDE) program has been provided to the Town for review; once finalized it will be posted to the website.
  • The town had 163 estimated MS4 outfalls; dry weather screenings were completed at 48 High and Low priority outfalls, with about 30% of the MS4 catchment area investigated.
  • 367 cars participated in the regional MDC Household Hazardous Waste Collection Day; no citizen reports of suspected illicit discharges were received in 2025.

Dates mentioned: February 2026 (report date); January 1, 2025 to December 31, 2025 (reporting period); February 15, 2025 (annual report due date); March 2, 2025 (annual report posted)

Attached files (1)

Town of East Granby MS4 General Permit 2025 Annual Report · PDF, 25 pages

Open the PDF download · town site copy

Text of the file
ENVIRONMENTAL 
SERVICES 

ENGINEERING 
SERVICES 

67 HALL ROAD PHONE (774) 241-0901 
STURBRIDGE, MA 01566 FAX (774) 241-0906 

2025 ANNUAL REPORT 

TOWN OF EAST GRANBY 
9 CENTER STREET 
EAST GRANBY, CONNECTICUT 

2017 MS4 GENERAL PERMIT 
EXISTING PERMITTEE 
PERMIT NUMBER GSM000089 

FEBRUARY 2026 

PREPARED FOR: 
TOWN OF EAST GRANBY 
9 CENTER STREET 
EAST GRANBY, CONNECTICUT 06026 

PREPARED BY: 
CMG ENVIRONMENTAL, INC. 
CMG ID 2025-189 

2025 ANNUAL REPORT  CMG ID 2025-189 
TOWN OF EAST GRANBY  FEBRUARY 2026 

- Page 1 - 
Introduction 

This Annual Report has been prepared for the Town of East Granby in compliance with the 
Connecticut Department of Energy & Environmental Protection (CT DEEP) General Permit for 
the Discharge of Stormwater from Small Municipal Separate Storm Sewer Systems (MS4) (MS4 
General Permit), effective July 1, 2017. This report documents the efforts of the Town of East 
Granby to comply with the conditions of the MS4 General Permit to the maximum extent 
practicable (MEP) for the period of January 1, 2025 to December 31, 2025. 

The 2025 Annual Report for the Town of East Granby is presented on the following pages. As a 
note, under Status in each BMP Summary table, “In progress” means the BMP has yet to be 
completed, and “Ongoing” means the BMP has been completed and upkeep/maintenance of it 
continues. 
 

2025 ANNUAL REPORT  CMG ID 2025-189 
TOWN OF EAST GRANBY   FEBRUARY 2026 

 - Page 2 - 
Part I: Summary of Minimum Control Measure Activities  

1. PUBLIC EDUCATION AND OUTREACH (Section 6 (a)(1) / page 19) 

1.1 BMP SUMMARY 
BMP Status Activities in  current reporting period Measurable goal Department responsible Due Completion date Additional details 
1-1 Implement 
public education 
and outreach 
Ongoing None SWMP posted 
to website 
Planning & 
Zoning 
Start by  
July 1, 2017 
Ongoing Stormwater Management Plan 
and all Annual Reports have been 
posted on the Town website and 
are available in the Land Use 
Department. The MS4 General 
Permit is also available 
1-2 Address 
education/outreach 
for pollutants of 
concern 
Ongoing None SWMP posted 
to website 
Planning & 
Zoning 
Start by  
July 1, 2017 
Ongoing Info regarding IDDE program 
will be posted to website 

1.2 DESCRIBE ANY PUBLIC EDUCATION AND OUTREACH ACTIVITIES PLANNED FOR THE NEXT YEAR, IF APPLICABLE. 
Town website will be further updated to include the following info: 
• Links to EPA Stormwater Discharges from Municipal Sources website and the UConn NEMO Connecticut MS4 Guide. 
• A draft IDDE Program has been provided to the Town for review. Once complete, it will be posted to the Town website and a banner indicating new info will be 
added. 
• Link to current Annual Report 

2025 ANNUAL REPORT  CMG ID 2025-189 
TOWN OF EAST GRANBY   FEBRUARY 2026 

 - Page 3 - 
1.3 DETAILS OF ACTIVITIES IMPLEMENTED TO EDUCATE THE COMMUNITY ON STORMWATER 

Program Element/Activity 
Audience (and 
number of people 
reached) 
Topic(s) covered Pollutant of Concern addressed (if applicable) Responsible dept. or partner org. 
Printed info available in Land Use Department at 
Town Hall and online on the Engineering 
Department web page.  
General public 
Stormwater pollution 
prevention and waste 
minimization 
NA Planning & Zoning 
Town website has mapping including natural and 
cultural resources which includes water resources, 
water quality, water-sheds, LID suitability, etc.; 
stormwater management and sewer mapping. 
General public Stormwater management NA Planning & Zoning 
Town ordinances, zoning and subdivision 
regulations to detail how to get approval for 
stormwater management systems for new 
commercial and residential development are 
posted on Town website. 
General public, 
developers 
Stormwater 
management NA Planning & Zoning 
LID Design Manual and LID Educational Booklet 
detailing BMPs for stormwater management 
posted on Town website. 
General public, 
developers 
Stormwater 
management NA Planning & Zoning 

2025 ANNUAL REPORT  CMG ID 2025-189 
TOWN OF EAST GRANBY   FEBRUARY 2026 

 - Page 4 - 
2. PUBLIC INVOLVEMENT/PARTICIPATION (Section 6(a)(2) / page 21) 

2.1 BMP SUMMARY 
BMP Status Activities in  current reporting period Measurable goal Department responsible Due Completion date Additional details 
2-1 Comply with public 
notice requirements for the 
Stormwater Management 
Plan 
Complete None SWMP posted 
to website 
Planning & 
Zoning 
April 3, 2017 April 3, 2017 Stormwater 
Management Plan has 
been posted on Town 
website  
2-1 Comply with public 
notice requirements for 
Annual Reports 
Ongoing Annual Report has been 
posted on Town website  
Annual Report 
posted to 
website 
Planning & 
Zoning 
Feb. 15, 2025 March 2, 2025 After posting, a banner 
was added to website 
indicating new info. 
Past Annual Reports are 
posted on Town website 
2-2 Promote community 
stormwater management 
efforts 
Ongoing Local Boy Scouts troops, 
East Granby Land Trust and 
local citizens conducted 
cleanup activities 
Events 
conducted 
annually 
Planning & 
Zoning 
Start by  
July 1, 2017 
Ongoing None 
2-2 Promote community 
clean-up 
Ongoing Town received funds from 
State due to surcharge on 
miniature alcohol beverage 
containers, i.e., nips, that 
were used to offset costs to 
operate the Town recycling 
center 
Litter removed Public Works None Ongoing None 

2.2 DESCRIBE ANY PUBLIC INVOLVEMENT/PARTICIPATION ACTIVITIES PLANNED FOR THE NEXT YEAR, IF APPLICABLE.  

Continuation of community stormwater management efforts listed above. 

2025 ANNUAL REPORT  CMG ID 2025-189 
TOWN OF EAST GRANBY   FEBRUARY 2026 

 - Page 5 - 
2.3 PUBLIC INVOLVEMENT/PARTICIPATION REPORTING METRICS 

Metrics Implemented Date Posted 
Availability of the Stormwater Management Plan announced to public   Yes April 15, 2017 Town website 
Availability of Annual Report announced to public Yes April 22, 2025 Town website 

2025 ANNUAL REPORT  CMG ID 2025-189 
TOWN OF EAST GRANBY   FEBRUARY 2026 

 - Page 6 - 
3. ILLICIT DISCHARGE DETECTION AND ELIMINATION (Section 6(a)(3) and Appendix B / page 22) 

3.1 BMP SUMMARY  
BMP Status Activities in  current reporting period Measurable goal Department responsible Due Completion date Additional details 
3-1 Develop written IDDE 
program  
In 
progress 
A draft IDDE Program 
has been provided to the 
Town for review 
Develop written 
IDDE program 
Planning & 
Zoning 
July 1, 
2018 
In progress Once complete, the Program 
will be posted to the Town 
website with a banner 
indicating new info added 
3-2 Develop list and maps of 
all MS4 stormwater outfalls 
in priority areas 
Complete None Develop list and 
map 
Planning & 
Zoning 
July 1, 
2020 
Dec. 10, 
2017 
Map of Priority Areas has 
been developed using NEMO 
MS4 mapping tool 
3-3 Implement citizen 
reporting program 
Ongoing The Town maintains a 
phone log to record 
citizen calls regarding 
stormwater management 
issues or suspected illicit 
discharges. Public Works 
investigates suspected 
illicit discharges 
Citizen reports 
logged and 
investigated 
Public Works July 1, 
2018 
July 1, 2017 Engineering Department web- 
page has stormwater info and 
contact info for Town 
Engineer. Town website has 
“Email Service Requests” that 
are directed to First 
Selectman. 
3-4 Establish legal authority 
to prohibit illicit discharges 
Complete Ordinance enforcement Illicit discharges 
investigated and 
remediated 
Planning & 
Zoning 
July 1, 
2018 
July 1, 2018 None 
3-5 Develop record keeping 
system for IDDE tracking 
Complete Systems in place and 
functioning properly 
Illicit discharges 
investigated, 
logged, tracked 
and remediated 
Planning & 
Zoning 
July 1, 
2018 
July 1, 2017 See 3-3 above 
3-6 Address IDDE in areas 
with pollutants of concern 
Ongoing IDDE complaints 
investigated, logged and 
tracked 
Illicit discharges 
investigated, 
logged, tracked 
and remediated 
Planning & 
Zoning; 
Engineering; 
Public Works 
Start by  
July 1, 
2017 
Ongoing None 
3-7 Household hazardous 
waste collection 
Ongoing Participation in MDC 
Household Hazardous 
Waste Collection Day 
with partner towns 
Household 
hazardous waste 
collected and 
recycled/ 
disposed 
Planning & 
Zoning 
Annually Annually 367 cars participated  
 

2025 ANNUAL REPORT  CMG ID 2025-189 
TOWN OF EAST GRANBY   FEBRUARY 2026 

 - Page 7 - 
3.2 DESCRIBE ANY IDDE ACTIVITIES PLANNED FOR THE NEXT YEAR, IF APPLICABLE. 
A draft of the written IDDE program has been sent to the Town for review. Following completion, it will be posted to the Town website. The written IDDE program will be 
updated as needed throughout the term of the General Permit.  

A master IDDE tracking spreadsheet will be maintained, and all employees involved in the IDDE program will be trained regarding the logging process. 

 3.3 LIST OF CITIZEN REPORTS OF SUSPECTED ILLICIT DISCHARGES RECEIVED DURING THIS REPORTING PERIOD. 
Date of Report Location / suspected source Response taken 
None received.   

3.4 PROVIDE A RECORD OF ILLICIT DISCHARGES OCCURRING DURING THE REPORTING PERIOD AND SSOS OCCURRING JULY 2012 THROUGH END OF 
REPORTING PERIOD USING THE FOLLOWING TABLE.      
Location 
(Lat long/ street 
crossing /address and 
receiving water) 
Date and 
duration of 
occurrence 
Discharge to 
MS4 or 
surface water 
Estimated 
volume 
discharged 
Known or 
suspected cause / 
Responsible 
party 
Corrective measures planned and completed  
(include dates) 
Sampling 
data (if 
applicable) 
None       

3.5 BRIEFLY DESCRIBE THE METHOD USED TO TRACK ILLICIT DISCHARGE REPORTS, RESPONSES TO THOSE REPORTS AND WHO WAS RESPONSIBLE 
FOR TRACKING THIS INFORMATION.   
Reports of illicit discharges are received and investigated by the Department of Public Works. 

2025 ANNUAL REPORT  CMG ID 2025-189 
TOWN OF EAST GRANBY   FEBRUARY 2026 

 - Page 8 - 
3.6 PROVIDE A SUMMARY OF ACTIONS TAKEN TO ADDRESS SEPTIC FAILURES USING THE TABLE BELOW.  
Location and nature of structure with failing 
septic systems 
Actions taken to respond to and  
address the failures Impacted waterbody or watershed, if known 
43 Country Club Lane New tank installed Stony Brook 
9 Larch Drive New tank installed Stony Brook 
24 Miller Road New tank installed Farmington River 
80 Old County Road New tank installed Farmington River 
49 Seymour Road Full system (tank and fields) installed Farmington River 
7 Southwood Lane Full system (tank and fields) installed Farmington River 
129 Spoonville Road New tank installed Farmington River 
32 Wynding Hills Road Full system (tank and fields) installed Farmington River 
45 Wynding Hills Road New tank installed Farmington River 

3.7 IDDE REPORTING METRICS       
Metrics  
Estimated or actual number of MS4 outfalls 163 
Estimated or actual number of interconnections Unknown 
Outfall mapping complete 100% 
Interconnection mapping complete 100% 
System-wide mapping complete (detailed MS4 infrastructure)  100% 
Outfall assessment and priority ranking 100% 
Dry weather screenings of all High and Low priority outfalls complete 48 
Catchment investigations complete 0 
Estimated percentage of MS4 catchment area investigated 30% 

2025 ANNUAL REPORT  CMG ID 2025-189 
TOWN OF EAST GRANBY   FEBRUARY 2026 

 - Page 9 - 
3.8 BRIEFLY DESCRIBE THE IDDE TRAINING FOR EMPLOYEES INVOLVED IN CARRYING OUT IDDE TASKS INCLUDING WHAT TYPE OF TRAINING IS 
PROVIDED AND HOW OFTEN IS IT GIVEN (MINIMUM ONCE PER YEAR). 
Annual training of Department of Public Works employees on the following topics: 
• MS4 General Permit 
• SWMP and who has responsibility for implementation 
• Discussion of IDDE, Post-Construction SW Management and Pollution Prevention / Good Housekeeping MCMs and what Town is required to do under each 

2025 ANNUAL REPORT  CMG ID 2025-189 
TOWN OF EAST GRANBY   FEBRUARY 2026 

 - Page 10 - 
4. CONSTRUCTION SITE RUNOFF CONTROL (Section 6(a)(4) / page 25) 

4.1 BMP SUMMARY  
BMP Status 
Activities in 
current reporting 
period 
Measurable goal Department responsible Due Completion date Additional details 
4-1 Implement, upgrade and 
enforce land use regulations or 
other legal authority to meet 
requirements of MS4 General 
Permit  
Ongoing Inspection of 
construction sites 
Regulations 
enforcement 
Planning & 
Zoning; 
Engineering 
July 1, 2019 Subdivision 
regs last 
updated in 
2012; 
wetland regs 
developed in 
2012; zoning 
regs last 
updated in 
2016; POCD 
developed in 
2016 
None 
4-2 Develop/implement plan 
for interdepartmental 
coordination in site plan 
review and approval 
Ongoing Planning & Zoning 
and Building Depts., 
Farmington Valley 
Health District, Town 
Engineer, Fire 
Marshal and traffic 
authority involved in 
review, permitting 
and approval of land 
disturbance projects 
as necessary 
Continued inter-
departmental site 
plan review and 
approval 
Planning & 
Zoning 
Start by  
July 1, 2017 
Ongoing None 
4-3 Review site plans for 
stormwater quality concerns 
Ongoing Town conducts plan 
reviews and 
inspections of 
projects disturbing 1 
or more acres 
Continued review 
of site plans for 
stormwater 
quality concerns 
Planning & 
Zoning; 
Engineering 
Start by  
July 1, 2017 
Ongoing Site inspections are to assess 
adequacy of installation, 
maintenance, operation and 
repair of construction and post-
construction control measures 
4-4 Conduct site inspections Ongoing Inspection of 
construction sites and 
issuance of notices of 
violation or stop work 
orders 
Inspections 
conducted 
Planning & 
Zoning; 
Engineering 
Start by  
July 1, 2017 
Ongoing None 

2025 ANNUAL REPORT  CMG ID 2025-189 
TOWN OF EAST GRANBY   FEBRUARY 2026 

 - Page 11 - 
BMP Status 
Activities in 
current reporting 
period 
Measurable goal Department responsible Due Completion date Additional details 
4-5 Implement procedure to 
allow public comment on site 
development 
Ongoing Hearings and/or 
public hearings with 
local land use 
commissions 
Public comment 
solicited and 
received 
Planning & 
Zoning 
Start by  
July 1, 2017 
Ongoing None 
4-6 Implement procedure to 
notify developers about DEEP 
Construction Stormwater 
General Permit 
Ongoing Developers and 
contractors notified of 
regulation if projects 
disturbing 1 or more 
acres 
Continued 
notification of 
developers of 
regulation 
Planning & 
Zoning 
Start by  
July 1, 2017 
Ongoing Developers and contractors are 
notified informally as needed 
during pre-application meetings 
with Town Engineer 

4.2 DESCRIBE ANY CONSTRUCTION SITE RUNOFF CONTROL ACTIVITIES PLANNED FOR THE NEXT YEAR, IF APPLICABLE.  
None other than continuation of those listed above. 

2025 ANNUAL REPORT  CMG ID 2025-189 
TOWN OF EAST GRANBY   FEBRUARY 2026 

 - Page 12 - 
5. POST-CONSTRUCTION STORMWATER MANAGEMENT (Section 6(a)(5) / page 27) 

5.1 BMP SUMMARY 
BMP Status 
Activities in 
current reporting 
period 
Measurable 
goal 
Department 
responsible Due Completion date Additional details 
5-1 Establish and/or update 
legal authority

Only the beginning is shown here; the whole file is searchable. Open the PDF for the rest.

Text of the post itself (1 paragraph)

Town of East Granby MS4 General Permit 2025 Annual Report Download

From the town's website: https://eastgranbyct.org/2025-ms4-general-permit-2025-annual-report/.