CT Public Docs Tracker

Towns / East Granby / Board of Education / May 19, 2025

Board of Education – Facilities Committee, May 19, 2025

East Granby minutes posted

Documents

TypeDocumentPagesOpen
minutes BOE Facilities Subcommittee Meeting Minutes 1 PDF download · town site
agenda BOE Facilities Subcommittee Meeting Agenda 1 PDF download · town site

Summary of the minutes

AI-generated summary. Each line links to the PDF page it came from; check it before relying on it.

Read the official minutes (PDF, 1 page) The PDF is the record; this summary is a guide to it.

The East Granby Board of Education Facilities Subcommittee met on May 19, 2025 to review building projects, capital close-outs, and maintenance needs. The subcommittee discussed a knee wall quote, a request not to exceed $15,000, and a $10,702.00 door replacement to be shared at the May 27, 2025 BoE meeting.

Discussed (6)

  • Knee wall in high school - capital request $15,000 10K: Request not to exceed $15,000 presented for capital close-out; quote from Newgate Builders for $12, 636 (does not include electrical); capital budgeted at 10K; any unused funds to be returned to the town · p. 1
  • Repair driveway cracks at all school buildings - capital request 20K: Ray is collecting 3 quotes; capital was budgeted at 20K · p. 1
  • Additional door repair (auditorium to hallway) - Calvert Safe and Lock quote $10,702.00: For information to be shared at BoE meeting on 5/27/25; quote to replace door not part of door grant; to be paid from the operating budget · p. 1
  • Tennis court future needs 15K: Repairs at high school courts were in excess of 15K this year; BoE/Town will need to determine future of the courts · p. 1
  • Field maintenance - Green Machine yearlong plan: BoE approved use of non lapsing funds (BoE meeting 9/23/24) for yearlong fields maintenance plan from Green Machine at high school; Business Manager Mary Hiney to contact them; BoE/Town to determine continued budget for overseeding and fertilization · p. 1
  • HS/MS gym use - maintenance, supplies and cleaning: BoE/Town to determine future oversight and cleaning of school spaces used for town activities; deposits and cleaning costs for an outside company discussed if no other agreement reached · p. 1
Summary of the agenda: BOE Facilities Subcommittee Meeting Agenda

AI-generated summary.

The East Granby Board of Education Facilities Sub-Committee agenda for May 19, 2025 lists items on capital close-out reviews, tennis court future needs, field maintenance, gym use, and an additional door repair cost. This document is an agenda only, so, motions, or dollar amounts have been recorded.

On the agenda (5)

  1. Capital Close-Out Reviews and Requests for June 2025 · p. 1
  2. Tennis Court – Future Needs · p. 1
  3. Field Maintenance / Ongoing Treatment · p. 1
  4. HS/MS Gym Use – Maintenance, Supplies and Cleaning · p. 1
  5. Additional Door Repair – Cost · p. 1

Full text of the documents

View the minutes PDF on this page (BOE Facilities Subcommittee Meeting Minutes) Open the PDF
Text of the minutes (BOE Facilities Subcommittee Meeting Minutes, 1 page)

Page 1 · open in PDF

East Granby Board of Education  
East Granby, Connecticut 06026 
Facilities Subcommittee Meeting Minutes  
Monday, May 19, 2025 
 
Board Members Present:  Bob Paskiewicz 
Others Present:  Superintendent Melissa Bavaro-Grande 
 
I. Call to Order and Pledge of Allegiance  
The facilities subcommittee meeting was called to order at 5:05 p.m., and all recited the Pledge of Allegiance. 
 
Read summary from Ray Carlson, Facilities Supervisor.  Highlights include: 
• HVAC at the MS/HS is nearly complete.  There are 4 units to install once school is out for the summer, as 
well as the final tie--in of controls and valves.  Air quality sensors have been installed at the HS in RTU 3 
and awaiting final tie-in to the control system.  The sensor at Allgrove School will be installed during the 
summer break.  These two sensors are a pilot to determine feasibility for ongoing air quality monitoring.   
• The door grant project is going through modifications to remain in budget. 
• The AC in the Seymour gymnasium is complete 
• Requested pricing on water, fire sprinklers, power and sewer hook ups in the event modular classrooms 
are needed at Allgrove.  
• 2 drains and a parapet wall with expansion joint at the high school (roof) have been reworked.  
 
II. Capital Close-Out Reviews and Requests for June 2025 
Reviewed the Capital List from the Town Treasurer Report to determine which projects will be closed out 
at the end of the fiscal year. These will be shared at the BoF meeting in June. 
Capital Requests:   
1) knee wall in the high school - quote from Newgate Builders for $12, 636, which does not include 
electrical.  No quotes from 2 additional builders.  Capital was budgeted at 10K. Request not to exceed 
$15,000, which will include electricity and any unused funds will be returned to the town. 
2) repair driveway cracks at all school buildings - Ray is collecting 3 quotes.  Capital was budgeted at 
20K.  
 
III. Tennis Court – Future Needs 
The tennis courts located at the high school were in excess of 15K to repair this year.  There is concern that 
they will be unrepairable moving forward.   The BoE/Town will need to determine the future of the courts.  
  
IV. Field Maintenance / Ongoing Treatment 
The BoE approved the use of non lapsing funds (BoE meeting 9/23/24) for a yearlong plan of fields 
maintenance from Green Machine at the high school.  Business Manager, Mary Hiney, will be in contact 
with them for timelines and field restrictions.  The BoE/Town will need to determine a continued budget 
to maintain ongoing overseeding and fertilization.   
   
V. HS/MS Gym Use – Maintenance, Supplies and Cleaning 
The school spaces continue to receive more requests for use, including both Saturday and Sunday.  With 
no custodial staff present, the BoE/Town will need to determine future oversight and cleaning of school 
spaces when used for town activities.  Deposits and cleaning costs for an outside company were discussed 
if no other agreement is reached.  
 
VI. Additional Door Repair - Cost 
For information to be shared at BoE meeting on 5/27/25 - Quote from Calvert Safe and Lock to replace a 
door that is not part of the door grant and can no longer be repaired - the auditorium to the hallway. The 
quote is $10,702.00 and will be paid from the operating budget.  
 
VII. Adjournment – 
The facilities subcommittee meeting was adjourned at 6:05 p.m. 
 
Respectfully submitted by, 
 
Melissa F. Bavaro-Grande 
Acting Board Secretary 
View the agenda PDF on this page (BOE Facilities Subcommittee Meeting Agenda) Open the PDF
Text of the agenda (BOE Facilities Subcommittee Meeting Agenda, 1 page)

Page 1 · open in PDF

 
 
East Granby Board of Education 
East Granby, Connecticut 
Monday, May 19, 2025 
Facilities Sub-Committee Meeting Agenda 
Board of Education Office – 5:00 P.M. 
 
 
 
 
I. Call to Order and Pledge of Allegiance 
 
II.       Capital Close-Out Reviews and Requests for June 2025 
 
III.      Tennis Court – Future Needs 
 
IV.      Field Maintenance / Ongoing Treatment 
 
V.      HS/MS Gym Use – Maintenance, Supplies and Cleaning 
 
VI.      Additional Door Repair – Cost 
 
VII.         Adjournment 
 
 
 
 
 
  

Minutes: archived copy, SHA-256 c4f62f6d40ff…, posted May 23, 2025. Agenda: archived copy, SHA-256 1e207790ccf3…, posted May 17, 2025.