Towns / East Granby / Board of Education / May 19, 2025
Board of Education – Facilities Committee, May 19, 2025
East Granby Board of Education Hide agendas that already have minutesDocuments
| Type | Document | Pages | Open |
|---|---|---|---|
| minutesminutes | BOE Facilities Subcommittee Meeting Minutes | 1 | PDF download · town site |
| agenda | BOE Facilities Subcommittee Meeting Agenda | 1 | PDF download · town site |
Summary of the minutes
AI-generated summary. Each line links to the PDF page it came from; check it before relying on it.
Read the official minutes (PDF, 1 page) The PDF is the record; this summary is a guide to it.
The East Granby Board of Education Facilities Subcommittee met on May 19, 2025 to review building projects, capital close-outs, and maintenance needs. The subcommittee discussed a knee wall quote, a request not to exceed $15,000, and a $10,702.00 door replacement to be shared at the May 27, 2025 BoE meeting.
Discussed (6)
- Knee wall in high school - capital request $15,000 10K: Request not to exceed $15,000 presented for capital close-out; quote from Newgate Builders for $12, 636 (does not include electrical); capital budgeted at 10K; any unused funds to be returned to the town · p. 1
- Repair driveway cracks at all school buildings - capital request 20K: Ray is collecting 3 quotes; capital was budgeted at 20K · p. 1
- Additional door repair (auditorium to hallway) - Calvert Safe and Lock quote $10,702.00: For information to be shared at BoE meeting on 5/27/25; quote to replace door not part of door grant; to be paid from the operating budget · p. 1
- Tennis court future needs 15K: Repairs at high school courts were in excess of 15K this year; BoE/Town will need to determine future of the courts · p. 1
- Field maintenance - Green Machine yearlong plan: BoE approved use of non lapsing funds (BoE meeting 9/23/24) for yearlong fields maintenance plan from Green Machine at high school; Business Manager Mary Hiney to contact them; BoE/Town to determine continued budget for overseeding and fertilization · p. 1
- HS/MS gym use - maintenance, supplies and cleaning: BoE/Town to determine future oversight and cleaning of school spaces used for town activities; deposits and cleaning costs for an outside company discussed if no other agreement reached · p. 1
Summary of the agenda: BOE Facilities Subcommittee Meeting Agenda
AI-generated summary.
The East Granby Board of Education Facilities Sub-Committee agenda for May 19, 2025 lists items on capital close-out reviews, tennis court future needs, field maintenance, gym use, and an additional door repair cost. This document is an agenda only, so, motions, or dollar amounts have been recorded.
On the agenda (5)
Full text of the documents
View the minutes PDF on this page (BOE Facilities Subcommittee Meeting Minutes)
Text of the minutes (BOE Facilities Subcommittee Meeting Minutes, 1 page)
Page 1 · open in PDF
East Granby Board of Education East Granby, Connecticut 06026 Facilities Subcommittee Meeting Minutes Monday, May 19, 2025 Board Members Present: Bob Paskiewicz Others Present: Superintendent Melissa Bavaro-Grande I. Call to Order and Pledge of Allegiance The facilities subcommittee meeting was called to order at 5:05 p.m., and all recited the Pledge of Allegiance. Read summary from Ray Carlson, Facilities Supervisor. Highlights include: • HVAC at the MS/HS is nearly complete. There are 4 units to install once school is out for the summer, as well as the final tie--in of controls and valves. Air quality sensors have been installed at the HS in RTU 3 and awaiting final tie-in to the control system. The sensor at Allgrove School will be installed during the summer break. These two sensors are a pilot to determine feasibility for ongoing air quality monitoring. • The door grant project is going through modifications to remain in budget. • The AC in the Seymour gymnasium is complete • Requested pricing on water, fire sprinklers, power and sewer hook ups in the event modular classrooms are needed at Allgrove. • 2 drains and a parapet wall with expansion joint at the high school (roof) have been reworked. II. Capital Close-Out Reviews and Requests for June 2025 Reviewed the Capital List from the Town Treasurer Report to determine which projects will be closed out at the end of the fiscal year. These will be shared at the BoF meeting in June. Capital Requests: 1) knee wall in the high school - quote from Newgate Builders for $12, 636, which does not include electrical. No quotes from 2 additional builders. Capital was budgeted at 10K. Request not to exceed $15,000, which will include electricity and any unused funds will be returned to the town. 2) repair driveway cracks at all school buildings - Ray is collecting 3 quotes. Capital was budgeted at 20K. III. Tennis Court – Future Needs The tennis courts located at the high school were in excess of 15K to repair this year. There is concern that they will be unrepairable moving forward. The BoE/Town will need to determine the future of the courts. IV. Field Maintenance / Ongoing Treatment The BoE approved the use of non lapsing funds (BoE meeting 9/23/24) for a yearlong plan of fields maintenance from Green Machine at the high school. Business Manager, Mary Hiney, will be in contact with them for timelines and field restrictions. The BoE/Town will need to determine a continued budget to maintain ongoing overseeding and fertilization. V. HS/MS Gym Use – Maintenance, Supplies and Cleaning The school spaces continue to receive more requests for use, including both Saturday and Sunday. With no custodial staff present, the BoE/Town will need to determine future oversight and cleaning of school spaces when used for town activities. Deposits and cleaning costs for an outside company were discussed if no other agreement is reached. VI. Additional Door Repair - Cost For information to be shared at BoE meeting on 5/27/25 - Quote from Calvert Safe and Lock to replace a door that is not part of the door grant and can no longer be repaired - the auditorium to the hallway. The quote is $10,702.00 and will be paid from the operating budget. VII. Adjournment – The facilities subcommittee meeting was adjourned at 6:05 p.m. Respectfully submitted by, Melissa F. Bavaro-Grande Acting Board Secretary
View the agenda PDF on this page (BOE Facilities Subcommittee Meeting Agenda)
Text of the agenda (BOE Facilities Subcommittee Meeting Agenda, 1 page)
Page 1 · open in PDF
East Granby Board of Education East Granby, Connecticut Monday, May 19, 2025 Facilities Sub-Committee Meeting Agenda Board of Education Office – 5:00 P.M. I. Call to Order and Pledge of Allegiance II. Capital Close-Out Reviews and Requests for June 2025 III. Tennis Court – Future Needs IV. Field Maintenance / Ongoing Treatment V. HS/MS Gym Use – Maintenance, Supplies and Cleaning VI. Additional Door Repair – Cost VII. Adjournment
Minutes: archived copy, SHA-256 c4f62f6d40ff…, posted May 23, 2025. Agenda: archived copy, SHA-256 1e207790ccf3…, posted May 17, 2025.